Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
6 21,660.81 11.55 0.05  
1 DARJEELING Naxalbari Siliguri W/S Division RUPSING PIPED WATER SUPPLY SCHEME , SM/11776 New Preparation of Details Project Report (DPR) incl. route survey in connection with proposed Rupsing Piped water supply schemes at the uncovered mouzas under Naxalbari Block of Siliguri Sub Division, PHE Dte. Assistant Engineer(Civil) Junior Engineer(Civil) ORD/000152/2022-2023 268/SSD 20/05/2022 20 SUBHANKAR GHOSH 2.73 2.71 99.27 100
2 DARJEELING Naxalbari Siliguri W/S Division RUPSING PIPED WATER SUPPLY SCHEME , SM/11776 New Material Requisition To Resource Division RTOR000074/2022-2023 2053/SWSD 16/12/2022 0 Resource Division 45.28 0.00 0 0
3 DARJEELING Naxalbari Siliguri W/S Division RUPSING PIPED WATER SUPPLY SCHEME , SM/11776 New Material Requisition To Resource Division RTOR000033/2022-2023 1463/SWSD 29/09/2022 0 Resource Division 6.38 0.00 0 0
4 DARJEELING Naxalbari Northern Mechanical RUPSING PIPED WATER SUPPLY SCHEME , SM/11776 New Supply, installation, commissioning and trial operation of electro-mechanical components along with copper wound line voltage corrector for RUPSING PIPED WATER SUPPLY SCHEME, TW No.- I and II in the district of Darjeeling under Northern Mechanical Division, PHE Dte. Assistant Engineer Junior Engineer ORD/000800/2023-2024 1657/NMD 29/09/2023 30 TALUKDER ENTERPRISE 11.50 8.84 76.87 50
5 DARJEELING Naxalbari Siliguri W/S Division RUPSING PIPED WATER SUPPLY SCHEME , SM/11776 New Part Work order for Construction of 200 cu.m. capacity R.C.C. elevated reservoir, 20 mtrs. staging height at the head work site, laying rising main, laying distribution pipeline with functional household tap connection (FHTC), construction of one number pump house (5.40 X 3.60 m), one number pump house (3.00 X 3.60 m), iron elimination plant (IEP) with blower room, sinking of two (2) nos. tube well (ODEX-165 method), soil investigation at HW site and boundary wall for Rupsing PWSS, Block Naxalbari, Dist- Darjeeling under Siliguri W/S Division, PHE Dte. ORD/000253/2023-2024 84/SWSD 10/01/2024 240 YAMA CONSTRUCTIONS LLP 255.16 0.00 0 0
6 DARJEELING Naxalbari Central Drilling RUPSING PIPED WATER SUPPLY SCHEME , SM/11776 New Construction of Big Diameter Tube-Well by Deploying of Suitable Capacity Drilling Rig (Direct Rotary, Reverse Rotary, Odex Method) at Different Districts for Different Water Supply Schemes Including Procurement & Installation Pumping Machinery with All Allied Accessories at the Above Constructed Tube-Wells Under JJM Program throughout the State of West Bengal. (2ed call of NIET 25 of 2022-23) Assistant Engineer,Driller In Charge Junior Engineer ORD/000001/2023-2024 1415/CDD 21/09/2023 304 JHARGRAM SPV PRIVATE LIMITED 21,339.76 0.00 0 11
Total 21,660.80 11.55 0.05