Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
24 1,633.89 267.21 16.35  
1 DARJEELING Siliguri W/S Division AUGMENTATION OF LAHUGAON PIPED WATER SUPPLY SCHEME , SM/10025 Augmentation Procurement of material from Resource Division P.H.E Dte. for the works of different water supply scheme. VCH/000890/2021-2022 BP-2021-22-108 25/03/2022 EXECUTIVE ENGINEER,RESOURCES DIVISION,PHE DTE. 230.79 0.00 0 0
2 DARJEELING Siliguri W/S Division AUGMENTATION OF LAHUGAON PIPED WATER SUPPLY SCHEME , SM/10025 Augmentation Procurement of material from Resource Division P.H.E Dte. for the works of different water supply scheme. VCH/000301/2022-2023 null 08/08/2022 EXECUTIVE ENGINEER,RESOURCES DIVISION,PHE DTE. 1.32 0.00 0 0
3 DARJEELING Siliguri W/S Division AUGMENTATION OF LAHUGAON PIPED WATER SUPPLY SCHEME , SM/10025 Augmentation HIRING OF 1 (ONE) NO. WELL MAINTAINED DIESEL CONSUMED LUXURY CAB ON MONTHLY HIRED BASIS PREFERABLY MAXI CAB (A/C) WITH ENGINE CAPACITY LESS THAN OR EQUAL TO 2000 CC FOR OFFICE OF THE CHIEF ENGINEER (CIVIL), NORTHER ZONE, P.H.E. DTE. VIVEKANANDA BHAWAN (2ND FLOOR) HILL CART ROAD, SILIGURI (FOR ASSISTANT CHIEF ENGINEER, NORTHERN ZONE (CIVIL), P.H.E. DTE. FOR THE PERIOD FROM 01.09.2022 TO 31.10.2022 i.e. 2 (TWO) MONTHS. BILL/00067/2022-2023 BP-2022-23-131 20/02/2023 OM TRAVELS 1.08 0.00 0 0
4 DARJEELING Siliguri W/S Division AUGMENTATION OF LAHUGAON PIPED WATER SUPPLY SCHEME , SM/10025 Augmentation Resources payment for Different Water Supply Scheme BILL/00121/2022-2023 BP-2022-23-141 13/03/2023 EXECUTIVE ENGINEER,RESOURCES DIVISION,PHE DTE. 131.28 0.00 0 0
5 DARJEELING Siliguri W/S Division AUGMENTATION OF LAHUGAON PIPED WATER SUPPLY SCHEME , SM/10025 Augmentation Laying distribution system (Part-B) allied with providing functional household tap connection (FHTC) under Jal Swapno and Jal Jeevan Mission at distribution pipeline (Part-B) of Lahugaon and adjoining mouzas Water Supply Scheme within Phansidewa block under Siliguri Sub Division, P.H.E. Dte. SL. NO. 02. Assistant Engineer(Civil) Junior Engineer(Civil) ORD/000133/2021-2022 2430/SWSD 21/03/2022 60 SUBIR CH. CHOWDHURY 64.88 37.49 57.78 65
6 DARJEELING Siliguri W/S Division AUGMENTATION OF LAHUGAON PIPED WATER SUPPLY SCHEME , SM/10025 Augmentation Laying distribution system (Part-C) allied with providing functional household tap connection (FHTC) under Jal Swapno and Jal Jeevan Mission at distribution pipeline (Part-C) of Lahugaon (Zone-1) and adjoining mouzas Water Supply Scheme within Phansidewa block under Siliguri Sub Division, P.H.E. Dte. SL. NO. 03. Assistant Engineer(Civil) Junior Engineer(Civil) ORD/000134/2021-2022 2431/SWSD 21/03/2022 50 AKASH ENTERPRISE 53.99 28.79 53.32 60
7 DARJEELING Siliguri W/S Division AUGMENTATION OF LAHUGAON PIPED WATER SUPPLY SCHEME , SM/10025 Augmentation Laying distribution system (Part-D) allied with providing functional household tap connection (FHTC) under Jal Swapno and Jal Jeevan Mission at distribution pipeline (Part-D) of Lahugaon and adjoining mouzas Water Supply Scheme within Phansidewa block under Siliguri Sub Division, P.H.E. Dte. SL. NO. 04. Assistant Engineer(Civil) Junior Engineer(Civil) ORD/000135/2021-2022 2432/SWSD 21/03/2022 50 M/S FULBARI CONSTRUCTION CO. 53.41 29.71 55.63 65
8 DARJEELING Siliguri W/S Division AUGMENTATION OF LAHUGAON PIPED WATER SUPPLY SCHEME , SM/10025 Augmentation Laying distribution system (Part-F) allied with providing functional household tap connection (FHTC) under Jal Swapno and Jal Jeevan Mission at distribution pipeline (Part-F) of Lahugaon and adjoining mouzas Water Supply Scheme within Phansidewa block under Siliguri Sub Division, PHE Dte. SL. NO. 06. Assistant Engineer(Civil) Junior Engineer(Civil) ORD/000136/2021-2022 2433/SWSD 21/03/2022 45 BUDDHADEV NAG 49.84 25.91 51.99 60
9 DARJEELING Siliguri W/S Division AUGMENTATION OF LAHUGAON PIPED WATER SUPPLY SCHEME , SM/10025 Augmentation Soil Investigation of Lahugaon Z II PWSS for Construction of 300 cum OHR under Siliguri Sub-Division P.H.E. Dte under Phansidewa Block. Assistant Engineer(Civil) Junior Engineer(Civil) ORD/000093/2022-2023 390/SSD 20/07/2022 20 D.P. ENTERPRISE 1.03 1.03 100 100
10 DARJEELING Siliguri W/S Division AUGMENTATION OF LAHUGAON PIPED WATER SUPPLY SCHEME , SM/10025 Augmentation Continuation of hiring of 1 (one) no. diesel consumed on monthly basis preferably Maxi Cab (With A/C) for O/O the assistant Engineer Siliguri W/S Division, PHE Dte. BILL/00110/2023-2024 BP-2023-24-41 28/07/2023 SUDIP BASAK 2.24 0.00 0 0
11 DARJEELING Northern Mechanical AUGMENTATION OF LAHUGAON PIPED WATER SUPPLY SCHEME , SM/10025 Augmentation Supply, installation, commissioning and trial operation of electro-mechanical components along with copper wound line voltage corrector for AUGMENTATION OF LAHUGAON PIPED WATER SUPPLY SCHEME, TW No. III (Zone-I), TW-I and II (Zone-II) in the district of Darjeeling under Northern Mechanical Division, PHE Dte. Assistant Engineer Junior Engineer ORD/000666/2023-2024 1480/NMD 17/08/2023 30 ANUP BASU 34.42 0.00 0 0
12 DARJEELING Northern Mechanical AUGMENTATION OF LAHUGAON PIPED WATER SUPPLY SCHEME , SM/10025 Augmentation New Service Connection Charge for LAHUGAON, KUMARTULI, T.W. No. I under BIDHANNAGAR CCC, [APPLICATION NO. 4003194405, Reference ID : 403046890] BILL/00590/2023-2024 BP/23-24/74 11/08/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED 2.22 0.00 0 0
13 DARJEELING Siliguri W/S Division AUGMENTATION OF LAHUGAON PIPED WATER SUPPLY SCHEME , SM/10025 Augmentation Soil Investigation of Lahugaon Z I PWSS for Construction of 400 cum OHR under Siliguri Sub-Division P.H.E. Dte under Phansidewa Block. Assistant Engineer(Civil) Junior Engineer(Civil) ORD/000092/2022-2023 389/SSD 20/07/2022 20 M/S PRANTIK ASSOCIATES 1.02 1.02 100 100
14 DARJEELING Siliguri W/S Division AUGMENTATION OF LAHUGAON PIPED WATER SUPPLY SCHEME , SM/10025 Augmentation Construction of 400 cu.m. capacity RCC Over Head Reservoir, 20 mtrs Staging height and rising mains with laying distribution system (Part-A) allied with Providing Functional Household Tap Connection (FHTC) under Jal Swapno and Jal Jeevan Mission at distribution pipeline (Part-A) of Lohugaon (Zone-I) and adjoining mouzas water supply scheme within Phansidewa block under Siliguri Sub Division, PHE Dte. Sl. No. 07. Assistant Engineer(Civil) Junior Engineer(Civil) ORD/000062/2022-2023 867/SWSD 21/07/2022 180 PALLAB BHOWAL 159.67 100.35 62.85 65
15 DARJEELING Siliguri W/S Division AUGMENTATION OF LAHUGAON PIPED WATER SUPPLY SCHEME , SM/10025 Augmentation Material Requisition To Resource Division RTOR000012/2021-2022 2169/SWSD 11/02/2022 Resource Division 313.89 0.00 0 0
16 DARJEELING Siliguri W/S Division AUGMENTATION OF LAHUGAON PIPED WATER SUPPLY SCHEME , SM/10025 Augmentation Material Requisition To Resource Division RTOR000019/2022-2023 1449/SWSD 29/09/2022 Resource Division 25.70 0.00 0 0
17 DARJEELING Siliguri W/S Division AUGMENTATION OF LAHUGAON PIPED WATER SUPPLY SCHEME , SM/10025 Augmentation Construction of 300 cum capacity Over Head Reservoir, Laying Distribution System with Providing Functional Household Tap Connection (FHTC), construction of Rig Bore Big Dia Deep Tubewells (H/W, 2nd & 3rd sites) by ODEX-165 method of drilling under Augmentation of Lohugaon (Zone-II) piped water supply scheme under Jal Swapna/JJM works within Phansidewa Block under Siliguri Sub Division, P.H.E. Dte. Assistant Engineer(Civil) Junior Engineer(Civil) ORD/000269/2022-2023 2376/SWSD 24/01/2023 200 FAIRDEAL ASSOCIATES 400.24 42.91 10.72 30
18 DARJEELING Northern Mechanical AUGMENTATION OF LAHUGAON PIPED WATER SUPPLY SCHEME , SM/10025 Augmentation Infrastructure Cost for LAHUGAON T/W No. II, ZONE-II, under BIDHANNAGAR CCC , [APPLICATION NO. 4003320704, Reference ID : 403147041] BILL/02023/2023-2024 BP/23-24/311 21/02/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED 4.35 0.00 0 0
19 DARJEELING Northern Mechanical AUGMENTATION OF LAHUGAON PIPED WATER SUPPLY SCHEME , SM/10025 Augmentation Infrastructure Cost for LAHUGAON T/W No. II, ZONE-II, under BIDHANNAGAR CCC , [APPLICATION NO. 4003320704, Reference ID : 403147041] BILL/02023/2023-2024 BP/23-24/311 21/02/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED 4.35 0.00 0 0
20 DARJEELING Northern Mechanical AUGMENTATION OF LAHUGAON PIPED WATER SUPPLY SCHEME , SM/10025 Augmentation Infrastructure Cost for LAHUGAON T/W No.II, ZONE-I, under BIDHANNAGAR CCC , [APPLICATION NO. 4003320700, Reference ID : 403147042] BILL/02022/2023-2024 BP/23-24/311 21/02/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED 5.74 0.00 0 0
21 DARJEELING Northern Mechanical AUGMENTATION OF LAHUGAON PIPED WATER SUPPLY SCHEME , SM/10025 Augmentation Infrastructure Cost for LAHUGAON T/W No.II, ZONE-I, under BIDHANNAGAR CCC , [APPLICATION NO. 4003320700, Reference ID : 403147042] BILL/02022/2023-2024 BP/23-24/311 21/02/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED 5.74 0.00 0 0
22 DARJEELING Siliguri W/S Division AUGMENTATION OF LAHUGAON PIPED WATER SUPPLY SCHEME , SM/10025 Augmentation Acceptance cum work order "Construction of Pump House (5.4 X 3.65) size with (1.20 X 2.10 M) size with toilet, plinth protection etc. and two nos Pump House (3600mm x 2400mm x 3300mm height) with toilet (2100mm x 1350mm) sanitary and plumbing arrangement along with verandah (3975mm x 1500mm) having plinth height 600m m. and construction of Boundary Wall at Three Different Site Pump House Site and Iron Elemination Plant Under Lohugaon (Z-II) at Lahugaon (Z-II) Piped Water Supply Scheme at Phansidewa block under Siliguri Sub Division, P.H.E. Dte. in the dist. of Darjeeling". Assistant Engineer(Civil) Junior Engineer(Civil) ORD/000320/2023-2024 603/SWSD 06/03/2024 60 SHYAMAL NATH 68.77 0.00 0 0
23 DARJEELING Central Drilling AUGMENTATION OF LAHUGAON PIPED WATER SUPPLY SCHEME , SM/10025 Augmentation Construction of Big diameter Tube-Well by Deployment of Suitable capacity Rig (Direct Rotary, Reverse Rotary, Odex Method) at Different District for Different Water Supply Schemes Including Procurement & Installation Pumping machinery with All Allied accessories at the Above Constructed Tube - Wells under JJM Program throughout the State of West Bengal. (2nd call of NIET 25 of 2022-23) (Phase-IX). Assistant Engineer,Driller In Charge Junior Engineer ORD/000030/2024-2025 560/CDD 06/08/2024 60 JHARGRAM SPV PRIVATE LIMITED 15.04 0.00 0 0
24 DARJEELING Northern Mechanical AUGMENTATION OF LAHUGAON PIPED WATER SUPPLY SCHEME , SM/10025 Augmentation Charges for additional quotation For lahugaon PWSS (Near Kumar tuli),Z-II,Tw-II under NMD PHE dte. Application no- 4003320704 Ref ID- 403147041 For Additional Quotation Application ID- 100000114620 Ref ID- 860308530 BILL/00643/2024-2025 BP/24-25/156 06/08/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED 2.88 0.00 0 null
Total 1,633.92 267.21 16.35