| Sl. No. | Division
Working Divisions
|
System Order No
System generated Order No. for the Work Order as per PHED-MIS
|
Order Date
Date of Issuance of the Work Order as per PHED-MIS
|
Memo Number
Memo no. for Work Order Provided by the Divisions as per PHED-MIS
|
Vendor Name
Vendor Appointed Against this Work Order as per PHED-MIS
|
Work Name
Name of the Work as per the Issued Work Order
|
Order Value
Value of Work as mentioned in the Work Order
|
|---|---|---|---|---|---|---|---|
| 3 | 13.07 | ||||||
| 1 | Demo Civil Office of Executive Engineer | ORD/000501/2023-2024 | 30/11/2023 | 2954/A/MURD | ASSISTANT ENGINEER, BALURGHAT SADAR SUB-DIVISION. | Test Entry fo Work Order test Entry Of Work order after adding option without tender | 6.54 |
| 2 | Demo Civil Office of Executive Engineer | ORD/000001/2024-2025 | 30/05/2024 | AABCD/01 | DEMO VENDOR | Test Work Order to Check the scheme value total breakup with the order value | 6.54 |
| 3 | Demo Civil Office of Executive Engineer | ORD/000008/2024-2025 | 07/02/2025 | 1215/W/MMD | DEMO AGENCY BASAK | Acceptance cum work order for Sinking of 2 (two) no. 300 mm. x 200 mm. dia. 250 mtr deep Replacement Tubewell by D.R. Rig method with UPVC pipe & UPVC ribbed strainer at Augmentation of Bansghata Water Supply Scheme (H/W Site & 2nd T/W Site) under Bongaon | 0.00 |
| Total | 13.07 | ||||||