No. of unauthorized work order
Exception Report Showing the Status of Major Pending Works for the Divisions

Update Data
Rs. in Lakh
Showing 1 to 3 of 3 entries
Sl. No.Division
Working Divisions
System Order No
System generated Order No. for the Work Order as per PHED-MIS
Order Date
Date of Issuance of the Work Order as per PHED-MIS
Memo Number
Memo no. for Work Order Provided by the Divisions as per PHED-MIS
Vendor Name
Vendor Appointed Against this Work Order as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Order Value
Value of Work as mentioned in the Work Order
3 13.07
Sl. No.
Division
Working Divisions
System Order No
System generated Order No. for the Work Order as per PHED-MIS
Order Date
Date of Issuance of the Work Order as per PHED-MIS
Memo Number
Memo no. for Work Order Provided by the Divisions as per PHED-MIS
Vendor Name
Vendor Appointed Against this Work Order as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Order Value
Value of Work as mentioned in the Work Order
3
13.07
Total
13.07
1 Demo Civil Office of Executive Engineer ORD/000501/2023-2024 30/11/2023 2954/A/MURD ASSISTANT ENGINEER, BALURGHAT SADAR SUB-DIVISION. Test Entry fo Work Order test Entry Of Work order after adding option without tender 6.54
2 Demo Civil Office of Executive Engineer ORD/000001/2024-2025 30/05/2024 AABCD/01 DEMO VENDOR Test Work Order to Check the scheme value total breakup with the order value 6.54
3 Demo Civil Office of Executive Engineer ORD/000008/2024-2025 07/02/2025 1215/W/MMD DEMO AGENCY BASAK Acceptance cum work order for Sinking of 2 (two) no. 300 mm. x 200 mm. dia. 250 mtr deep Replacement Tubewell by D.R. Rig method with UPVC pipe & UPVC ribbed strainer at Augmentation of Bansghata Water Supply Scheme (H/W Site & 2nd T/W Site) under Bongaon 0.00
Total 13.07