No. of unauthorized work order
Exception Report Showing the Status of Major Pending Works for the Divisions

Update Data
Rs. in Lakh
Sl. No. Division
Working Divisions
System Order No
System generated Order No. for the Work Order as per PHED-MIS
Order Date
Date of Issuance of the Work Order as per PHED-MIS
Memo Number
Memo no. for Work Order Provided by the Divisions as per PHED-MIS
Vendor Name
Vendor Appointed Against this Work Order as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Order Value
Value of Work as mentioned in the Work Order
4 51.76
1 South 24 Pgs Mechanical Division ORD/000712/2024-2025 28/10/2024 3420/SMD ELECTRICAL & MECHANICAL ENGINEERING CORPORATION Supply, installation and commissioning of submersible pumping machinery along with allied accessories at Replacement of TW-1, Zone-I, Augmentation of Kamalpur Rudranagar (Phase-B) water supply scheme under South 24 Pgs. Mechanical Division, PHE Dte. [Bloc 10.85
2 South 24 Pgs Mechanical Division ORD/000714/2024-2025 28/10/2024 3420/SMD ELECTRICAL & MECHANICAL ENGINEERING CORPORATION Supply, installation and commissioning of submersible pumping machinery along with allied accessories at Replacement of TW-1, Zone-I, Augmentation of Kamalpur Rudranagar (Phase-B) water supply scheme under South 24 Pgs. Mechanical Division, PHE Dte. [Bloc 10.85
3 South 24 Pgs Mechanical Division ORD/000698/2024-2025 17/04/2024 1410/SMD T.S. CONSTRUCTION Additional Work related to Supply & delivery of Submersible pumping machinery along with allied accessories at P.H. 4 for Dakshin Roypur W/S Schemes under South 24-Pgs Mechanical Division, PHE Dte. [Block-Pathar Pratima] 8.82
4 South 24 Pgs Mechanical Division ORD/000972/2025-2026 27/08/2025 2507/SMD M/S. S.S. ENTERPRISE Continuation order for Providing guarding arrangement for GLR-2 at DH-II under Falta Mathurapur Mega surface water based water supply project in South 24pgs district under SMD,PHE Dte. 21.24
Total 51.76