| Sl. No. | Division
Working Divisions
|
System Order No
System generated Order No. for the Work Order as per PHED-MIS
|
Order Date
Date of Issuance of the Work Order as per PHED-MIS
|
Memo Number
Memo no. for Work Order Provided by the Divisions as per PHED-MIS
|
Vendor Name
Vendor Appointed Against this Work Order as per PHED-MIS
|
Work Name
Name of the Work as per the Issued Work Order
|
Order Value
Value of Work as mentioned in the Work Order
|
|---|---|---|---|---|---|---|---|
| 11 | 46.55 | ||||||
| 1 | Jalpaiguri Division | ORD/000487/2021-2022 | 30/11/2021 | 839/RWS | ANUP SARKAR | Restoration work in connection with shifting of pipe line due to widening & work of NHAI from Fulbari more to Jhumur Bridge for Ambari Falakata W/S/S under Jalpaiguri Division , P.H.E. Dte | 3.04 |
| 2 | Jalpaiguri Division | ORD/000472/2021-2022 | 30/11/2021 | 840/RWS | M/S RATAN KUMAR DAS GUPTA AND CO | Providing Drainage system for waste water of iron Elemination plant for Mandal ghat W/S/S under Jalpaiguri Division , P.H.E. Dte | 1.72 |
| 3 | Jalpaiguri Division | ORD/000572/2021-2022 | 04/03/2022 | 183/RWS | BISWAJIT BHADURI | Maintenance O.H.R for rejuvenation of Garalbari Zone ¿ II W/S/S under Jalpaiguri Division P.H.E. Dte. | 3.15 |
| 4 | Jalpaiguri Division | ORD/001076/2021-2022 | 31/12/2021 | 909/RWS | M/S SURAJIT DEY AND CO. | Continuation order for Maintenance of pipe line & other Mise work related to pipe Mtc. of I.E plant for Kilkot T.G PWSS under Jalpaiguri Division P.H.E.Dte.(Period from - 01.01.2022 to 28.02.2022) | 0.70 |
| 5 | Jalpaiguri Division | ORD/000401/2022-2023 | 09/03/2023 | 604/JD | M/S DEY & ROY CHOUDHURY | Providing R.B.T (Reinforced Barbed Tape) in the Boundary Wall ,construction of chamber & changing of valves of I.E.P at Charerbari Water Supply Scheme under Jalpaiguri Division, PHE Dte. | 3.92 |
| 6 | Jalpaiguri Division | ORD/000042/2022-2023 | 01/04/2022 | 01/RWS | SUKES BASU MAJUMDAR | Extension order for the work of supply of different chemicals Lime for I.E.P. at Head work site under Maynaguri Water Supply Scheme under Jalpaiguri Division PHE Dte. | 0.73 |
| 7 | Jalpaiguri Division | ORD/000092/2025-2026 | 30/05/2025 | 105/JSSD | GURUKUL INFOTECH | Laying distribution system with other allied works in connection with Jal Jeevan Mission at Tunbari Tea Garden Piped Water Supply Scheme under Jalpaiguri Division, PHE Dte. | 4.97 |
| 8 | Jalpaiguri Division | ORD/000079/2025-2026 | 30/05/2025 | 99/JSSD | RAGHU DAS | Laying of dedicated pipeline along with commissioning of Augmentation of Angrabhasa Piped W/S Scheme in connection with JJM at Nagrakata Block, under Jalpaiguri Division, P.H.E. Dte. | 12.42 |
| 9 | Jalpaiguri Division | ORD/000175/2025-2026 | 25/07/2025 | 174/JSSD | ADWIJA CONSTRUCTION | Construction approach with paver block inside the premises and land development at HW site & 2nd TW Site of Neoranadi TG Piped Water Supply Scheme under Jalpaiguri Division, P.H.E. Dte. | 7.51 |
| 10 | Jalpaiguri Division | ORD/000176/2025-2026 | 25/07/2025 | 175/JSSD | TEESTA CO OPERATIVE LABOUR CONTRACT AND CONSTRUCTION SOCITY LIMITED. | Construction approach with paver block inside the premises and land development at HW site & 2nd TW Site of Nipucchapur TG Piped Water Supply Scheme under Jalpaiguri Division, P.H.E. Dte. | 7.59 |
| 11 | Jalpaiguri Division | ORD/000025/2026-2027 | 30/04/2026 | 0303 | DHIRAJ BISWAS | Continuation for the Work "Hiring of 1 (One) Number Maxi Cab (Inspection Vehicle) with engine capacity less than or equal to 2000 C.C. on hire basis including driver and fuel in good condition under the Assistant Engineer, Jalpaiguri Sadar Sub Division, P | 0.80 |
| Total | 46.55 | ||||||