No. of unauthorized work order
Exception Report Showing the Status of Major Pending Works for the Divisions

Update Data
Rs. in Lakh
Sl. No. Division
Working Divisions
System Order No
System generated Order No. for the Work Order as per PHED-MIS
Order Date
Date of Issuance of the Work Order as per PHED-MIS
Memo Number
Memo no. for Work Order Provided by the Divisions as per PHED-MIS
Vendor Name
Vendor Appointed Against this Work Order as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Order Value
Value of Work as mentioned in the Work Order
22 728.12
1 Jalpaiguri Division ORD/000487/2021-2022 30/11/2021 839/RWS ANUP SARKAR Restoration work in connection with shifting of pipe line due to widening & work of NHAI from Fulbari more to Jhumur Bridge for Ambari Falakata W/S/S under Jalpaiguri Division , P.H.E. Dte 3.04
2 Jalpaiguri Division ORD/000472/2021-2022 30/11/2021 840/RWS M/S RATAN KUMAR DAS GUPTA AND CO Providing Drainage system for waste water of iron Elemination plant for Mandal ghat W/S/S under Jalpaiguri Division , P.H.E. Dte 1.72
3 Jalpaiguri Division ORD/000572/2021-2022 04/03/2022 183/RWS BISWAJIT BHADURI Maintenance O.H.R for rejuvenation of Garalbari Zone ¿ II W/S/S under Jalpaiguri Division P.H.E. Dte. 3.15
4 Jalpaiguri Division ORD/001076/2021-2022 31/12/2021 909/RWS M/S SURAJIT DEY AND CO. Continuation order for Maintenance of pipe line & other Mise work related to pipe Mtc. of I.E plant for Kilkot T.G PWSS under Jalpaiguri Division P.H.E.Dte.(Period from - 01.01.2022 to 28.02.2022) 0.70
5 Jalpaiguri Division ORD/000401/2022-2023 09/03/2023 604/JD M/S DEY & ROY CHOUDHURY Providing R.B.T (Reinforced Barbed Tape) in the Boundary Wall ,construction of chamber & changing of valves of I.E.P at Charerbari Water Supply Scheme under Jalpaiguri Division, PHE Dte. 3.92
6 Jalpaiguri Division ORD/000042/2022-2023 01/04/2022 01/RWS SUKES BASU MAJUMDAR Extension order for the work of supply of different chemicals Lime for I.E.P. at Head work site under Maynaguri Water Supply Scheme under Jalpaiguri Division PHE Dte. 0.73
7 Jalpaiguri Division ORD/000566/2024-2025 16/01/2025 1501 SANKAR DAS Interconnection work between M.S. and D.I. Pipe, construction valve chamber including filling at Sukani and other ancillary works at Ambari Falakata PWSS at Rajganj Block under Jalpaiguri Division, PHE Dte. 17.53
8 Jalpaiguri Division ORD/000453/2024-2025 10/12/2024 1002 RABINDRA NATH DUTTA Balance Laying Distribution System and Providing Functional House Hold Tap Connection at Gaurgram PWSS in Maynaguri Block under Jalpaiguri Division, P.H.E.Dte. 34.39
9 Jalpaiguri Division ORD/000543/2024-2025 10/01/2025 0403 SADHAN KARMAKAR Construction of Additional Components for uncovered TANTY PARA AREA of BARAGHARIA PWSS i.e TW, Pump House ,Boundary Wall, Water distribution Network ,FHTC, Rising main etc. in connection with Jal Jeevan Mission at Block-Mal under Jalpaiguri Division, P.H. 113.85
10 Jalpaiguri Division ORD/000158/2024-2025 25/09/2024 264/JSSD PRITAM DUTTA Balance work i.c.w Laying Rising Main from 1st, 2nd & 3rd Tubewell site to OHR for Augmentation of Oodlabari (Zone-II) PWSS in connection with Jal Jeevan Mission at Block -Mal under Jalpaiguri Division, P.H.E.Dte. 2.47
11 Jalpaiguri Division ORD/000536/2024-2025 08/01/2025 0402 ANUP SARKAR Laying distribution system for Augmentation of BHATIAPARA (ZONE-I) Piped Water Supply Scheme (PART-A) at Banarhut Block under Jalpaiguri Division, P.H.E Dte 146.75
12 Jalpaiguri Division ORD/000445/2024-2025 09/12/2024 1403 EFFLUENT AND WATERTREATMENT ENGINEERS PVT. LTD Sinking of 2 (Two) Nos Big Dia Tube Well (250mm x 200mm x 120 mtr. Depth) by Modified R.C. Drilling Rig at Haldibari Tea Garden (D) of Augmentation of Binnaguri Piped Water Supply Scheme under Jalpaiguri Division, P.H.E. Dte. 38.97
13 Jalpaiguri Division ORD/000155/2024-2025 25/09/2024 261/JSSD KANAI LAL SEN Balance work in connection with laying distribution system incl. Providing FHTC for i.c.w.Jal Jeevan Mission for Indong Tea Garden Area Area Piped W/S Scheme under Jalpaiguri Division, P.H.¿. Dte. 5.88
14 Jalpaiguri Division ORD/000233/2024-2025 25/10/2024 5716 SAPTASWA SARKAR Construction of different components of Chamurchi Zone 2 PWSS Rising Main, FHTC etc. in connection with Jal Jeevan Mission at Block - Banarhat under Jalpaiguri Division, P.H.E. Dte. 68.98
15 Jalpaiguri Division ORD/000477/2024-2025 16/12/2024 1108 A P CONSTRUCTION Balance Laying Distribution System with Providing Functional House Hold Tap Connection in connection with JJM at Purba Salbari Piped Water Supply Scheme under Jalpaiguri Division, P.H.E.Dte. (Phase-II) 36.26
16 Jalpaiguri Division ORD/000152/2024-2025 25/09/2024 268/JSSD SAHA CONSTRUCTION Balance work, Construction of approaches to Pump house area and Land development inside PH area under Rejuvenation of Syli TG PWSS in connection with Jal Jeevan Mission under Jalpaiguri Division, P.H.E.Dte. 6.49
17 Jalpaiguri Division ORD/000153/2024-2025 23/09/2024 244/JSSD ARUP SARKAR Installation of a Rig Bored Big Dia Deep Tubewell by ODEX-165 method of drilling along with pump connection and other allied works at Uttar Salbari Mouza (5th T/W site) of Augmentation of Angrabhasa Piped Water Supply Scheme, Nagrakata Block under Jalpa 9.97
18 Jalpaiguri Division ORD/000443/2024-2025 06/12/2024 1401 EFFLUENT AND WATERTREATMENT ENGINEERS PVT. LTD Sinking of 2 (Two) Nos Big Dia Tube Well (250mm x 200mm x 120 mtr. Depth) by Modified R.C. Drilling Rig at Telipara Tea Garden (D) of Augmentation of Binnaguri Piped Water Supply Scheme under Jalpaiguri Division, P.H.E. Dte. 38.97
19 Jalpaiguri Division ORD/000444/2024-2025 09/12/2024 1402 EFFLUENT AND WATERTREATMENT ENGINEERS PVT. LTD Sinking of 1 (One) Nos Big Dia Tube Well (250mm x 200mm x 120 mtr. Depth) by Modified R.C. Drilling Rig at Maraghat Tea Garden (D) of Augmentation of Binnaguri Piped Water Supply Scheme under Jalpaiguri Division, P.H.E. Dte. 19.49
20 Jalpaiguri Division ORD/000537/2024-2025 09/01/2025 0404 NEW KUNDU ENTERPRISE Construction of Boundary wall with gate, Drain, Land development ,Pathway at H/W Site & 2nd T/W site at Zone-I, H/W site , 2nd T/W & 3rd T/W site at Zone-II and H/W Site & 2nd T/W site at Zone-III including balance portion of laying distribution system wi 165.71
21 Jalpaiguri Division ORD/000115/2024-2025 10/09/2024 331/JSSD SWAPAN SAHA Providing Sluice Valves at Purba Batabari Piped Water Supply Scheme under Jalpaiguri Division, P.H.E.Dte. 0.55
22 Jalpaiguri Division ORD/000143/2024-2025 24/09/2024 255/JSSD ARUP SARKAR Laying distribution system and providing FHTC with other allied works under Jal Jeevan Mission for the adjacent area of Dharanipur Cha Sundari piped W/S scheme at Nagrakata Block under Jalpaiguri Sadar Sub Division P.H.E. Dte. (Phase-II) 8.59
Total 728.12