No. of unauthorized work order
Exception Report Showing the Status of Major Pending Works for the Divisions

Update Data
Rs. in Lakh
Sl. No. Division
Working Divisions
System Order No
System generated Order No. for the Work Order as per PHED-MIS
Order Date
Date of Issuance of the Work Order as per PHED-MIS
Memo Number
Memo no. for Work Order Provided by the Divisions as per PHED-MIS
Vendor Name
Vendor Appointed Against this Work Order as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Order Value
Value of Work as mentioned in the Work Order
18 152.91
1 Jalpaiguri Division ORD/000487/2021-2022 30/11/2021 839/RWS ANUP SARKAR Restoration work in connection with shifting of pipe line due to widening & work of NHAI from Fulbari more to Jhumur Bridge for Ambari Falakata W/S/S under Jalpaiguri Division , P.H.E. Dte 3.04
2 Jalpaiguri Division ORD/000472/2021-2022 30/11/2021 840/RWS M/S RATAN KUMAR DAS GUPTA AND CO Providing Drainage system for waste water of iron Elemination plant for Mandal ghat W/S/S under Jalpaiguri Division , P.H.E. Dte 1.72
3 Jalpaiguri Division ORD/000572/2021-2022 04/03/2022 183/RWS BISWAJIT BHADURI Maintenance O.H.R for rejuvenation of Garalbari Zone ¿ II W/S/S under Jalpaiguri Division P.H.E. Dte. 3.15
4 Jalpaiguri Division ORD/001076/2021-2022 31/12/2021 909/RWS M/S SURAJIT DEY AND CO. Continuation order for Maintenance of pipe line & other Mise work related to pipe Mtc. of I.E plant for Kilkot T.G PWSS under Jalpaiguri Division P.H.E.Dte.(Period from - 01.01.2022 to 28.02.2022) 0.70
5 Jalpaiguri Division ORD/000401/2022-2023 09/03/2023 604/JD M/S DEY & ROY CHOUDHURY Providing R.B.T (Reinforced Barbed Tape) in the Boundary Wall ,construction of chamber & changing of valves of I.E.P at Charerbari Water Supply Scheme under Jalpaiguri Division, PHE Dte. 3.92
6 Jalpaiguri Division ORD/000042/2022-2023 01/04/2022 01/RWS SUKES BASU MAJUMDAR Extension order for the work of supply of different chemicals Lime for I.E.P. at Head work site under Maynaguri Water Supply Scheme under Jalpaiguri Division PHE Dte. 0.73
7 Jalpaiguri Division ORD/000158/2024-2025 25/09/2024 264/JSSD PRITAM DUTTA Balance work i.c.w Laying Rising Main from 1st, 2nd & 3rd Tubewell site to OHR for Augmentation of Oodlabari (Zone-II) PWSS in connection with Jal Jeevan Mission at Block -Mal under Jalpaiguri Division, P.H.E.Dte. 2.47
8 Jalpaiguri Division ORD/000142/2024-2025 25/09/2024 257/JSSD ARUP SARKAR Land development works at the Zone-II H/W Site along with pump connection and other allied works at Augmentation of Luksan Bazar Piped Water Supply Scheme at Nagrakata Block under Jalpaiguri Division, PHE Dte. 2.61
9 Jalpaiguri Division ORD/000146/2024-2025 25/09/2024 259/JSSD GOLDEN KEY ENTERPRISE Balance work in connection with laying rising main with other allied works for Rejuvenation of Nayasayli Tea Garden Piped W/S Scheme under JJM at Nagrakata Block, under Jalpaiguri Division, P.H.E. Dte. 7.07
10 Jalpaiguri Division ORD/000155/2024-2025 25/09/2024 261/JSSD KANAI LAL SEN Balance work in connection with laying distribution system incl. Providing FHTC for i.c.w.Jal Jeevan Mission for Indong Tea Garden Area Area Piped W/S Scheme under Jalpaiguri Division, P.H.¿. Dte. 5.88
11 Jalpaiguri Division ORD/000233/2024-2025 25/10/2024 5716 SAPTASWA SARKAR Construction of different components of Chamurchi Zone 2 PWSS Rising Main, FHTC etc. in connection with Jal Jeevan Mission at Block - Banarhat under Jalpaiguri Division, P.H.E. Dte. 68.98
12 Jalpaiguri Division ORD/000232/2024-2025 25/10/2024 0715 BOSE ENTERPRISE Construction of IEP and Blower Room of Uttar Dhupjhora PWSS in connection with Jal Jeevan Mission at Block - Metali under Jalpaiguri Division, P.H.E.Dte. 17.26
13 Jalpaiguri Division ORD/000148/2024-2025 25/09/2024 267/JSSD GOURAV CONSTRUCTION CO. -Interconnection work including FHTC with allied works at Augmentation of Looksan Bazar Piped W/S Scheme ( zone-I & III) in connection with JJM at Nagrakata Block, under Jalpaiguri Division, P.H.E.Dte. 2.25
14 Jalpaiguri Division ORD/000151/2024-2025 25/09/2024 269/JSSD PRADIP SAHA Balance work in connection with Laying distribution system along with providing FHTC at Tandu Piped W/S Scheme in connection with JJM at Nagrakata Block, under Jalpaiguri Division, P.H.E. Dte. 7.52
15 Jalpaiguri Division ORD/000152/2024-2025 25/09/2024 268/JSSD SAHA CONSTRUCTION Balance work, Construction of approaches to Pump house area and Land development inside PH area under Rejuvenation of Syli TG PWSS in connection with Jal Jeevan Mission under Jalpaiguri Division, P.H.E.Dte. 6.49
16 Jalpaiguri Division ORD/000153/2024-2025 23/09/2024 244/JSSD ARUP SARKAR Installation of a Rig Bored Big Dia Deep Tubewell by ODEX-165 method of drilling along with pump connection and other allied works at Uttar Salbari Mouza (5th T/W site) of Augmentation of Angrabhasa Piped Water Supply Scheme, Nagrakata Block under Jalpa 9.97
17 Jalpaiguri Division ORD/000115/2024-2025 10/09/2024 331/JSSD SWAPAN SAHA Providing Sluice Valves at Purba Batabari Piped Water Supply Scheme under Jalpaiguri Division, P.H.E.Dte. 0.55
18 Jalpaiguri Division ORD/000143/2024-2025 24/09/2024 255/JSSD ARUP SARKAR Laying distribution system and providing FHTC with other allied works under Jal Jeevan Mission for the adjacent area of Dharanipur Cha Sundari piped W/S scheme at Nagrakata Block under Jalpaiguri Sadar Sub Division P.H.E. Dte. (Phase-II) 8.59
Total 152.91