| 55 | 1,911.96 | ||||||
| 1 | Raiganj Division | ORD/000369/2025-2026 | 07/08/2025 | 2269/RD/PHE | MILAN GHOSH | Additional pipeline, Pathway, Land development and other ancillary works at FASIA DAITON piped water Supply Scheme Under Islampur Sub-Division under Raiganj Division,P.H.E Dte. | 81.38 |
| 2 | Raiganj Division | ORD/000370/2025-2026 | 08/08/2025 | 2273/RD/PHE | RAHUL ENTERPRISE RNJRAHULENTERPRISE@GMAIL.COM | Additional pipeline, Pathway, Land development and other ancillary works at Bangaon piped water Supply Scheme Under Islampur Sub-Division under Raiganj Division, P.H.E Dte. | 45.83 |
| 3 | Raiganj Division | ORD/000372/2025-2026 | 11/08/2025 | 2279/RD/PHE | MS SANDHYA CONSTRUCTION | Additional pipeline, Pathway, Land development and other ancillary works at Dakshin Ariyagaon piped water Supply Scheme Under Islampur Sub-Division under Raiganj Division, P.H.E Dte. | 59.74 |
| 4 | Raiganj Division | ORD/000375/2025-2026 | 12/08/2025 | 2289/RD/PHE | DEEP CONSTRUCTION | Additional pipeline, Pathway, Land development and other ancillary works at GOALIN piped water Supply Scheme Under Islampur Sub-Division under Raiganj Division, P.H.E Dte. | 78.53 |
| 5 | Raiganj Division | ORD/000376/2025-2026 | 14/08/2025 | 2291/RD/PHE | M/S LOKENATH CONSTRUCTION (SUDARSHANPUR) | Laying of Additional Pipeline for KADERGANJ Piped Water Supply Scheme for installation of FHTC Work under Islampur Sub-Division P.H.E. Dte. under Raiganj Division, P.H.E Dte., U/D. | 58.07 |
| 6 | Raiganj Division | ORD/000377/2025-2026 | 18/08/2025 | 2297/RD/PHE | WEST DINAJPUR TAPASILI LABOUR CO-OPERATIVE CONTRACT & CONSTRUCTION SOCIETY LTD. | Construction of concrete pathway for NARAYANPUR Piped Water Supply Scheme at Head Work Site Pump House & 2nd Pump House Site under Islampur Sub-Division PHED under Raiganj Division, PHED.,U/D. | 9.87 |
| 7 | Raiganj Division | ORD/000385/2025-2026 | 15/07/2025 | 2097/RD/PHE | M/S SACHIN KUMAR | Laying of additional pipeline for improving FHTC with ancillary works at different mouzas at BARA DOPAHARU PWSS Of CHOPRA Block under Islampur Sub-Division P.H.E. Dte. (2nd Call) | 43.32 |
| 8 | Raiganj Division | ORD/000366/2025-2026 | 05/08/2025 | 2256/RD/PHE | S M CONSTRUCTION RAJ.GSHOSH325@GMAIL.COM | Additional pipeline, Pathway, Land development and other ancillary works at Mirjadpur piped water Supply Scheme Under Islampur Sub-Division under Raiganj Division, P.H.E Dte. | 55.93 |
| 9 | Raiganj Division | ORD/000368/2025-2026 | 07/08/2025 | 2268/RD/PHE | M/S PINKI CONSTRUCTION | Additional pipeline, Pathway, Land development and other ancillary works at Dakshin Rampur piped water Supply Scheme Under Islampur SubDivision under Raiganj Division, P.H.E Dte. | 37.22 |
| 10 | Raiganj Division | ORD/000371/2025-2026 | 08/08/2025 | 2274/RD/PHE | M/S PINKI CONSTRUCTION | Additional pipeline, Pathway, Land development and other ancillary works at Chapuwa piped water Supply Scheme Under Islampur Sub-Division under Raiganj Division, P.H.E Dte. | 53.38 |
| 11 | Raiganj Division | ORD/000380/2025-2026 | 20/08/2025 | 2313/RD/PHE | M/S SHIB ENTERPRISE | Additional pipeline, Pathway, Land development and other ancillary works at UTTTAR JIBHAKATA piped water Supply Scheme Under Islampur Sub-Division under Raiganj Division, P.H.E Dte. | 15.20 |
| 12 | Raiganj Division | ORD/000381/2025-2026 | 09/07/2025 | 2041/RD/PHE | PRIYA CONSTRUCTION | Construction of concrete pathway at Head Work Site Pump House & 2nd TW Site Pump House for Malkot Piped Water Supply Scheme under Islampur Sub-Division PHED under Raiganj Division, PHE Dte.,U/D. (2nd Call) | 20.46 |
| 13 | Raiganj Division | ORD/000249/2025-2026 | 04/06/2025 | 1485/RD/PHE | M/S LUCKY CONSTRUCTION | Laying of Additional Pipeline with land development and path way for GAISAL Water Supply Scheme for installation of FHTC Work under Islampur Sub-Division P.H.E. Dte. under Raiganj Division, P.H.E Dte.,U/D. | 54.57 |
| 14 | Raiganj Division | ORD/000248/2025-2026 | 09/07/2025 | 2035/RD/PHE | KAMIRUL SK & CO. | Balance pipe line for providing functional household tap connection (FHTC), approach road with land development of headwork site & 2nd tubewell site and road restoration of Bhatol PWSS at Raiganj Block under Raiganj Division, PHE Dte., Uttar Dinajpur. (2n | 46.67 |
| 15 | Raiganj Division | ORD/000250/2025-2026 | 09/07/2025 | 2040/RD/PHE | M/S CHOUDHURY CONSTRUCTION | Additional pipeline and other ancillary works at Malkot piped water Supply Scheme Under Islampur Sub-Division under Raiganj Division, P.H.E Dte. (2nd Call) | 43.33 |
| 16 | Raiganj Division | ORD/000273/2025-2026 | 23/07/2025 | 2162/RD/PHE | M/S MAA BOLLA CONSTRUCTION | Providing FHTC in connection with Paschim Chutikhore Pipe Water Supply Scheme at Chopra Block of Uttar Dinajpur District under Raiganj Division. | 8.62 |
| 17 | Raiganj Division | ORD/000387/2025-2026 | 23/07/2025 | 2161/RD/PHE | M/S SACHIN KUMAR | Laying of additional pipeline for improving FHTC with ancillary works at different mouzas at KATAGAON PWSS Of CHOPRA Block under Islampur Sub-Division P.H.E. Dte. | 32.55 |
| 18 | Raiganj Division | ORD/000395/2025-2026 | 14/08/2025 | 2292/RD/PHE | M/S RADHASWAMI ENTERPRISE | Additional pipeline, Pathway, Land development and other ancillary works at MALIGAON piped water Supply Scheme Under Islampur Sub-Division under Raiganj Division, P.H.E Dte. | 58.95 |
| 19 | Raiganj Division | ORD/000396/2025-2026 | 22/08/2025 | 2336/RD/PHE | MILAN GHOSH | Additional pipeline and other ancillary works at Samaspur piped water Supply Scheme Under Islampur SubDivision under Raiganj Division,P.H.E Dte. | 46.96 |
| 20 | Raiganj Division | ORD/000399/2025-2026 | 16/06/2025 | 1597/RD/PHE | MAA BICHITRA CONSTRUCTION MAABICHITRACONST@GMAIL.COM | Balance pipe line with boundary wall for the purpose of Augmentation of Sergram & it's adjoining mouzas piped Water Supply Scheme of Kaliyaganj Block in the District of Uttar Dinajpur under Raiganj Division, P.H.E Dte. | 19.53 |
| 21 | Raiganj Division | ORD/000401/2025-2026 | 17/06/2025 | 1607/RD/PHE | SANDIP SARKAR | Ancillary works and inter connection b/w rising main and OHR, I.C.W. Augmentation of Sasan PWSS at Hemtabad Block in the District of Uttar Dinajpur under Raiganj Division, P.H.E Dte. | 3.79 |
| 22 | Raiganj Division | ORD/000405/2025-2026 | 17/06/2025 | 1609/RD/PHE | M/S PINKI CONSTRUCTION | Restoration of damage pipeline during road widening at Bikhanpur piped water Supply Scheme at Karandighi Block Under Islampur SubDivision under Raiganj Division,P.H.E Dte. | 13.22 |
| 23 | Raiganj Division | ORD/000379/2025-2026 | 20/08/2025 | 2306/RD/PHE | UJJWAL DAS | Additional FHTC Work at RANIGANJ Pipe Water Supply Scheme under Islampur Sub-Division Under Raiganj Division, P.H.E. Dte. | 24.54 |
| 24 | Raiganj Division | ORD/000388/2025-2026 | 25/07/2025 | 2170/RD/PHE | M/S SHIB ENTERPRISE | Providing FHTC in connection with Purba Jaypura Pipe Water Supply Scheme at Chopra Block of Uttar Dinajpur District under Raiganj Division.(New PWSS) | 6.63 |
| 25 | Raiganj Division | ORD/000363/2025-2026 | 04/08/2025 | 2235/RD/PHE | MILAN GHOSH | Additional pipeline, Pathway, Land development and other ancillary works at CHOUKAI piped water Supply Scheme Under Islampur Sub-Division under Raiganj Division, P.H.E Dte. | 68.67 |
| 26 | Raiganj Division | ORD/000382/2025-2026 | 15/07/2025 | 2094/RD/PHE | M/S SACHIN KUMAR | Laying of additional pipeline for improving FHTC with ancillary works at different mouzas at DAKSHIN SAHAPUR PWSS Of Goalpokhar-1 Block under Islampur Sub-Division P.H.E. Dte. (2nd Call) | 39.10 |
| 27 | Raiganj Division | ORD/000389/2025-2026 | 25/07/2025 | 2174/RD/PHE | M/S SHIB ENTERPRISE | Providing FHTC in connection with Bara Dopaharu Pipe Water Supply Scheme at Chopra Block of Uttar Dinajpur District under Raiganj Division.(New PWSS) (2nd Call) | 5.40 |
| 28 | Raiganj Division | ORD/000397/2025-2026 | 16/06/2025 | 1596/RD/PHE | SANDIP SARKAR | Additional pipeline, Pathway, Land Development and other ancillary works at Dakshin Damodargachh Piped Water Supply Scheme Under Islampur Sub-Division under Raiganj Division, P.H.E Dte. | 12.06 |
| 29 | Raiganj Division | ORD/000409/2025-2026 | 30/07/2025 | 2220/RD/PHE | AJIT PRAMANIK | Balance pipe line for providing functional household tap connection (FHTC), approach road with land development of Headwork Site & 2nd Tubewell Site and Road Restoration of Maladkhanda PWSS at Raiganj Block under Raiganj Division, PHE Dte., Uttar Dinajpur | 93.42 |
| 30 | Raiganj Division | ORD/000274/2025-2026 | 25/07/2025 | 2173/RD/PHE | RAKSHIT TRADERS | Providing FHTC in connection with Uttar Mahangachh Pipe Water Supply Scheme at Chopra Block of Uttar Dinajpur District under Raiganj Division.(New PWSS) (2nd Call) | 8.37 |
| 31 | Raiganj Division | ORD/000244/2025-2026 | 04/06/2025 | 1464/RD/PHE | M/S LOKENATH CONSTRUCTION (SUDARSHANPUR) | Construction of Approach Road at Head Work Site, & 2nd Tube-Well Site under New Scheme of Pothia PWSS at Islampur Block under Raiganj Division, PHE Dte. | 6.18 |
| 32 | Raiganj Division | ORD/000252/2025-2026 | 04/06/2025 | 1486/RD/PHE | SANDIP SARKAR | Construction of Approach Road, Laying of Pipe Line and other Allied Works of Kaliganj(Tharais) Pwss Within Itahar Block Under Raiganj Division P.H.E. Dte., Raiganj, Uttar Dinajpur. | 21.47 |
| 33 | Raiganj Division | ORD/000280/2025-2026 | 29/07/2025 | 2207/RD/PHE | M/S LOKENATH CONSTRUCTION (SUDARSHANPUR) | Designing, Supplying, Febrication, Erection on suitable RCC foundation, commissioning with 3(three) months Trial Run (including cost of routine testing of water sample and flow/hr for performance evaluation) of pressure type Iron Removal Plant as per desi | 33.60 |
| 34 | Raiganj Division | ORD/000246/2025-2026 | 04/06/2025 | 1466/RD/PHE | DUTTA ENTERPRISE | Road Restoration with Earth Filling at Head Work Site, & 2nd Tube-Well Site under New Scheme of Bhulki PWSS at Karandighi Block under Raiganj Division, PHE Dte. | 2.50 |
| 35 | Raiganj Division | ORD/000251/2025-2026 | 09/07/2025 | 2042/RD/PHE | M/S RATAN SARKAR & SON | Construction of concrete pathway with earth filling at Head Work Site Pump House & 2nd TW Site Pump House for Kundargaon Piped Water Supply Scheme under Islampur Sub-Division PHED under Raiganj Division, PHED., U/D. (2nd Call) | 5.40 |
| 36 | Raiganj Division | ORD/000257/2025-2026 | 10/07/2025 | 2047/RD/PHE | ROY ENGINEERS. (PATNA) | Laying of additional pipeline for improving FHTC with ancillary works at different mouzas at SHOLPARA PWSS Of Goalpokhar-1 Block under Islampur Sub-Division P.H.E. Dte. (2nd Call) | 52.51 |
| 37 | Raiganj Division | ORD/000267/2025-2026 | 14/07/2025 | 2086/RD/PHE | ROY ENGINEERS. (PATNA) | Laying of additional pipeline for improving FHTC with ancillary works at different mouzas at BARA SINGHNATH PWSS Of Goalpokhar-1 Block under Islampur Sub-Division P.H.E. Dte. (2nd Call) | 45.73 |
| 38 | Raiganj Division | ORD/000383/2025-2026 | 15/07/2025 | 2095/RD/PHE | M/S SACHIN KUMAR | Laying of additional pipeline for improving FHTC with ancillary works at different mouzas at Bara Mircha PWSS Of CHOPRA Block under Islampur Sub-Division P.H.E. Dte. (2nd Call) | 25.81 |
| 39 | Raiganj Division | ORD/000386/2025-2026 | 15/07/2025 | 2098/RD/PHE | M/S SACHIN KUMAR | Laying of additional pipeline for improving FHTC with ancillary works at different mouzas at PURBA JAYPURA PWSS Of CHOPRA Block under Islampur Sub-Division P.H.E. Dte. (2nd Call) | 56.82 |
| 40 | Raiganj Division | ORD/000402/2025-2026 | 17/06/2025 | 1608/RD/PHE | M/S LOKENATH CONSTRUCTION (SUDARSHANPUR) | Balance work i.c.w. Construction of boundary wall of Chandgaon piped water supply scheme of Kaliyaganj Block in the District of Uttar Dinajpur under Raiganj Division, P.H.E Dte. | 3.36 |
| 41 | Raiganj Division | ORD/000403/2025-2026 | 22/08/2025 | 2341/RD/PHE | MILAN GHOSH | Additional pipeline and other ancillary works at Puar piped water Supply Scheme Under Islampur SubDivision under Raiganj Division,P.H.E Dte. | 32.63 |
| 42 | Raiganj Division | ORD/000407/2025-2026 | 26/08/2025 | 2366/RD/PHE | MILAN GHOSH | Additional pipeline and other ancillary works at Dakshin Neamatpur piped water Supply Scheme Under Islampur Sub -Division under Raiganj Division,P.H.E Dte. | 32.18 |
| 43 | Raiganj Division | ORD/000408/2025-2026 | 17/06/2025 | 1606/RD/PHE | SARVATAH PROJECTS PRIVATE LIMITED | Balance pipe line for providing functional household tap connection (FHTC), approach road with land development of headwork site & 2nd Tubewell Site and road restoration of Laksmania PWSS at Raiganj Block under Raiganj Division, PHE Dte., Uttar Dinajpur. | 39.50 |
| 44 | Raiganj Division | ORD/000247/2025-2026 | 04/06/2025 | 1484/RD/PHE | ROY ENGINEERS. (PATNA) | Installation of Rigbored Twell 250mmx150mm dia. at BHOTAMARI Pipe Water Supply Scheme at CHOPRA Block of Uttar Dinajpur District under Raiganj Division, PHE Dte.(at Head work Site , 2nd & 3rd Tube-Well. ) | 30.50 |
| 45 | Raiganj Division | ORD/000264/2025-2026 | 14/07/2025 | 2079/RD/PHE | ROY ENGINEERS. (PATNA) | Laying of additional pipeline for improving FHTCwith ancillary works at different mouzas at KICHAKTOLA PWSS Of Goalpokhar-1 Block under Islampur Sub-Division P.H.E. Dte. (2nd Call) | 38.99 |
| 46 | Raiganj Division | ORD/000270/2025-2026 | 14/07/2025 | 2087/RD/PHE | ROY ENGINEERS. (PATNA) | Laying of additional pipeline for improving FHTC with ancillary works at different mouzas at PRATAPPUR PWSS Of Goalpokhar-1 Block under Islampur Sub-Division P.H.E. Dte. (2nd Call) | 38.64 |
| 47 | Raiganj Division | ORD/000276/2025-2026 | 29/07/2025 | 2181/RD/PHE | MAA TARA CONSTRUCTION (SEVOKPALLY) RGJMAATARA@GMAIL.COM | Providing FHTC in connection with Goalin Pipe Water Supply Scheme at Goalpukhur-I Block of Uttar Dinajpur District under Raiganj Division.(New PWSS) (2nd Call) | 6.17 |
| 48 | Raiganj Division | ORD/000336/2025-2026 | 24/06/2025 | 1805/RD/PHE | S. DUTTA | Designing, Supplying, Febrication, Erection on suitable RCC foundation, commissioning with 3(three) months Trial Run (including cost of routine testing of water sample and flow/hr for performance evaluation) of pressure type Iron Removal Plant as per desi | 29.59 |
| 49 | Raiganj Division | ORD/000348/2025-2026 | 12/09/2025 | 2494/RD/PHE | UNIVERSAL ENGINEERS CO-OPERATIVE SOCIETY LTD. | Designing, Supplying, Febrication, Erection on suitable RCC foundation, commissioning with 3(three) months Trial Run (including cost of routine testing of water sample and flow/hr for performance evaluation) of pressure type Iron Removal Plant as per desi | 13.82 |
| 50 | Raiganj Division | ORD/000364/2025-2026 | 04/08/2025 | 2236/RD/PHE | M/S RATAN SARKAR & SON | Additional pipeline, Pathway, Land development and other ancillary works at DAMODARKHURI piped water Supply Scheme Under Islampur Sub-Division under Raiganj Division,P.H.E Dte. | 65.82 |
| 51 | Raiganj Division | ORD/000365/2025-2026 | 05/08/2025 | 2255/RD/PHE | TAPAN KUMAR MAJUMDER NAMEDUTTA@GMAIL.COM | Additional pipeline, Pathway, Land development and other ancillary works at Sarjapur piped water Supply Scheme Under Islampur Sub-Division under Raiganj Division, P.H.E Dte. | 63.81 |
| 52 | Raiganj Division | ORD/000373/2025-2026 | 11/08/2025 | 2280/RD/PHE | MILAN GHOSH | Land Development and Construction of concrete pathway at Head Work Site Pump House & 2nd TW Site Pump House for Baligora PWSS under Islampur Sub-Division PHED under Raiganj Division, PHED.,U/D. | 1.95 |
| 53 | Raiganj Division | ORD/000378/2025-2026 | 18/08/2025 | 2298/RD/PHE | UJJWAL DAS | Laying of Additional Pipeline and other ancillary works for RANIGANJ Piped Water Supply Scheme for installation of FHTC Work under Islampur Sub-Division P.H.E. Dte. under Raiganj Division, P.H.E Dte.,U/D. | 39.72 |
| 54 | Raiganj Division | ORD/000398/2025-2026 | 22/08/2025 | 2337/RD/PHE | MILAN GHOSH | Additional pipeline and other ancillary works at Belan piped water Supply Scheme Under Islampur SubDivision under Raiganj Division,P.H.E Dte. | 45.48 |
| 55 | Raiganj Division | ORD/000400/2025-2026 | 22/08/2025 | 2340/RD/PHE | MILAN GHOSH | Additional pipeline and other ancillary works at Kabutar Khopi piped water Supply Scheme Under Islampur SubDivision under Raiganj Division,P.H.E Dte. | 34.47 |