| 1 | 13.82 | ||||||
| 1 | Raiganj Division | ORD/000348/2025-2026 | 12/09/2025 | 2494/RD/PHE | UNIVERSAL ENGINEERS CO-OPERATIVE SOCIETY LTD. | Designing, Supplying, Febrication, Erection on suitable RCC foundation, commissioning with 3(three) months Trial Run (including cost of routine testing of water sample and flow/hr for performance evaluation) of pressure type Iron Removal Plant as per desi | 13.82 |
| Total | 13.82 | ||||||