Sl. No. | Division
Working Divisions
|
System Order No
System generated Order No. for the Work Order as per PHED-MIS
|
Order Date
Date of Issuance of the Work Order as per PHED-MIS
|
Memo Number
Memo no. for Work Order Provided by the Divisions as per PHED-MIS
|
Vendor Name
Vendor Appointed Against this Work Order as per PHED-MIS
|
Work Name
Name of the Work as per the Issued Work Order
|
Order Value
Value of Work as mentioned in the Work Order
|
---|---|---|---|---|---|---|---|
16 | 227.84 | ||||||
1 | Burdwan Division | ORD/000680/2022-2023 | 08/02/2023 | 99/KSD | BABUL SK | Work order for "Extension of UPVC pipeline at New Madhuban area of Dharmadanga W/S Scheme under Kalna Sub-Division under Burdwan Division, PHE Dte. (Part-A)"Sl No-3 | 0.95 |
2 | Burdwan Division | ORD/000681/2022-2023 | 08/02/2023 | 100/KSD | BABUL SK | Work order for "Relaying of HDPE Pipeline for existing damaged pipeline at new Madhuban area of Dharmadanga W/S Scheme under Kalna Sub-Division under Burdwan Division, PHE Dte. Sl No-4" | 0.89 |
3 | Burdwan Division | ORD/000682/2022-2023 | 08/02/2023 | 101/KSD | BUILD-TECH | Work order for "Providing Functional house hold tap connections for Sajal Gram Village within Kalna-I Block under Kalna Sub-Division under Burdwan Division, PHE Dte. (Dharmadanga Water Supply Scheme) Sl No- 5". | 0.88 |
4 | Burdwan Division | ORD/000683/2022-2023 | 08/02/2023 | 102/KSD | BABUL SK | Work order for "Providing Functional house hold tap connections for Sajal Gram Village within Kalna-II Block under Kalna Sub-Division under Burdwan Division, PHE Dte. (Tehata Water Supply Scheme)" | 0.88 |
5 | Burdwan Division | ORD/000686/2022-2023 | 08/02/2023 | 103/KSD | MOMINUL ISLAM MONDAL | Work Order for "Providing Functional house hold tap connections for Sajal Gram Village within Purbasthali-I Block under Kalna Sub-Division under Burdwan Division, PHE Dte. (Nadanghat & others scheme)" Sl No- 7 | 0.88 |
6 | Burdwan Division | ORD/000134/2024-2025 | 07/06/2024 | 1015/BSD | DEBASHISH ENTERPRISE | Improvement of 300cum. OHR (Concreting,Plastering,Primer and Painting) for Abujhati PWSS under Jamalpur Block under Burdwan Division PHE Dte. | 2.01 |
7 | Burdwan Division | ORD/000321/2024-2025 | 22/07/2024 | 2857/BWD | SUSUNIA GP CO. OPERATIVE LABOUR CONTRACT AND CONSTRUCTION SOCIETY LTD. | Construction of Boundary wall at HEAD WORK Site & 2nd TW site & Culvert at Head work site & Interconnection between Head work site distribution line 2nd Tw site of DURGADANGA Piped Water Supply Scheme under MEMARI-I Block of Burdwan Division, PHE Dte. ( | 39.17 |
8 | Burdwan Division | ORD/000285/2024-2025 | 11/07/2024 | 2724/BWD | ESCON INDIA | Improvement works including repairing & remodelling of Borshul Inspection Banglow under Augmentation of BORSHUL (Zone-II) PWSS in Bardhaman-II Block. (SM/10481) within Burdwan Division PHE Dte. | 15.27 |
9 | Burdwan Division | ORD/000337/2024-2025 | 23/07/2024 | 2898/BWD | HORIZEN | Digital structuration of pipeline alignment and asset evaluation including holistic design, preparation of design drawings of overall LDS & preparation of estimate for 14 Nos. Piped W/S. Schemes under Purbasthali I Block under Kalna Sub-Division under Bur | 38.00 |
10 | Burdwan Division | ORD/000338/2024-2025 | 23/07/2024 | 2899/BWD | HORIZEN | Digital structuration of pipeline alignment and asset evaluation including holistic design, preparation of design drawings of overall LDS & preparation of estimate for 09 Nos. Piped W/S. Schemes under Purbasthali II Block under Kalna Sub-Division under Bu | 23.70 |
11 | Burdwan Division | ORD/000334/2024-2025 | 23/07/2024 | 2895/BWD | PREMANANDA ROY BISWAS | Different works related (sinking of Tube-wells at Maro Dakshin Para, LDSs, Interconnections, FHTCs, Construction of MARO Piped Water Supply Scheme for obstruction of Railway under Galsi-I Block, of Durgapur Sub Division, under Burdwan Division, PHE. Dte. | 57.60 |
12 | Burdwan Division | ORD/000335/2024-2025 | 23/07/2024 | 2896/BWD | HORIZEN | Digital structuration of pipeline alignment and asset evaluation including holistic design, preparation of design drawings of overall LDS & preparation of estimate for 11 Nos. Piped W/S. Schemes under Kalna I Block under Kalna Sub-Division under Burdwan D | 29.60 |
13 | Burdwan Division | ORD/001443/2020-2021 | 29/01/2021 | 105/KSD | H SAMANTA | Work Order for Operation & Maintenance of Distribution System , Sluice Valves, S.S. posts etc. including operation of sluice valves of Lohana (Chuadanga) Piped W/S. Scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. [Period from 01.02.202 | 3.13 |
14 | Burdwan Division | ORD/001208/2023-2024 | 30/10/2023 | 4635/BWD | A.K. SIKDAR | Engagement of Laboratory personnel (Analyst and Sampling Assistant) at various Water Testing Laboratories under Burdwan Division, PHE Dte., Purba Bardhaman. [Period For Four Months, i.e. 01.11.2023 to 28.02.2024]. | 6.42 |
15 | Burdwan Division | ORD/000146/2024-2025 | 10/06/2024 | 1035/BSD | MUKHERJEE ENTERPRISE | Providing 19 Nos. FHTC at DHOLAN & FAGUPUR village for declaration of SWAJALGRAM under ISHUFABAD Piped Water Supply Scheme, Block- Burdwan-I within Burdwan Sub Division under Burdwan Division PHE Dte. | 0.91 |
16 | Burdwan Division | ORD/000336/2024-2025 | 23/07/2024 | 2897/BWD | HORIZEN | Digital structuration of pipeline alignment and asset evaluation including holistic design, preparation of design drawings of overall LDS & preparation of estimate for 03 Nos. Piped W/S. Schemes under Kalna II Block under Kalna Sub-Division under Burdwan | 7.55 |
Total | 227.84 |