Sl. No. | Division
Working Divisions
|
System Order No
System generated Order No. for the Work Order as per PHED-MIS
|
Order Date
Date of Issuance of the Work Order as per PHED-MIS
|
Memo Number
Memo no. for Work Order Provided by the Divisions as per PHED-MIS
|
Vendor Name
Vendor Appointed Against this Work Order as per PHED-MIS
|
Work Name
Name of the Work as per the Issued Work Order
|
Order Value
Value of Work as mentioned in the Work Order
|
---|---|---|---|---|---|---|---|
8 | 10.57 | ||||||
1 | Burdwan Division | ORD/000680/2022-2023 | 08/02/2023 | 99/KSD | BABUL SK | Work order for "Extension of UPVC pipeline at New Madhuban area of Dharmadanga W/S Scheme under Kalna Sub-Division under Burdwan Division, PHE Dte. (Part-A)"Sl No-3 | 0.95 |
2 | Burdwan Division | ORD/000681/2022-2023 | 08/02/2023 | 100/KSD | BABUL SK | Work order for "Relaying of HDPE Pipeline for existing damaged pipeline at new Madhuban area of Dharmadanga W/S Scheme under Kalna Sub-Division under Burdwan Division, PHE Dte. Sl No-4" | 0.89 |
3 | Burdwan Division | ORD/000682/2022-2023 | 08/02/2023 | 101/KSD | BUILD-TECH | Work order for "Providing Functional house hold tap connections for Sajal Gram Village within Kalna-I Block under Kalna Sub-Division under Burdwan Division, PHE Dte. (Dharmadanga Water Supply Scheme) Sl No- 5". | 0.88 |
4 | Burdwan Division | ORD/000683/2022-2023 | 08/02/2023 | 102/KSD | BABUL SK | Work order for "Providing Functional house hold tap connections for Sajal Gram Village within Kalna-II Block under Kalna Sub-Division under Burdwan Division, PHE Dte. (Tehata Water Supply Scheme)" | 0.88 |
5 | Burdwan Division | ORD/000686/2022-2023 | 08/02/2023 | 103/KSD | MOMINUL ISLAM MONDAL | Work Order for "Providing Functional house hold tap connections for Sajal Gram Village within Purbasthali-I Block under Kalna Sub-Division under Burdwan Division, PHE Dte. (Nadanghat & others scheme)" Sl No- 7 | 0.88 |
6 | Burdwan Division | ORD/001443/2020-2021 | 29/01/2021 | 105/KSD | H SAMANTA | Work Order for Operation & Maintenance of Distribution System , Sluice Valves, S.S. posts etc. including operation of sluice valves of Lohana (Chuadanga) Piped W/S. Scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. [Period from 01.02.202 | 3.13 |
7 | Burdwan Division | ORD/001129/2023-2024 | 18/01/2024 | 121/BSD | DHIRENDRANATH SOM | Laying distribution system different damaged section regrading smooth running FHTC work for RAYAN Water Supply Scheme at Bardhaman-I Development Block under Burdwan Division,PHE Dte. | 0.96 |
8 | Burdwan Division | ORD/000002/2024-2025 | 18/04/2024 | DSD/DSD | SUJAUDDIN SEKH | Continuation order for Supply of 01(one) No. Diesel Driven Motor Cab (Bharat Stage-II) on hire basis for the office of the Assistant Engineer, Durgapur Sub-Division (Burdwan North) P.H.E. Dte. Govt. of West Bengal (for the period of January'2024 to May'20 | 2.00 |
Total | 10.57 |