No. of unauthorized work order
Exception Report Showing the Status of Major Pending Works for the Divisions

Update Data
Rs. in Lakh
Sl. No. Division
Working Divisions
System Order No
System generated Order No. for the Work Order as per PHED-MIS
Order Date
Date of Issuance of the Work Order as per PHED-MIS
Memo Number
Memo no. for Work Order Provided by the Divisions as per PHED-MIS
Vendor Name
Vendor Appointed Against this Work Order as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Order Value
Value of Work as mentioned in the Work Order
16 227.84
1 Burdwan Division ORD/000680/2022-2023 08/02/2023 99/KSD BABUL SK Work order for "Extension of UPVC pipeline at New Madhuban area of Dharmadanga W/S Scheme under Kalna Sub-Division under Burdwan Division, PHE Dte. (Part-A)"Sl No-3 0.95
2 Burdwan Division ORD/000681/2022-2023 08/02/2023 100/KSD BABUL SK Work order for "Relaying of HDPE Pipeline for existing damaged pipeline at new Madhuban area of Dharmadanga W/S Scheme under Kalna Sub-Division under Burdwan Division, PHE Dte. Sl No-4" 0.89
3 Burdwan Division ORD/000682/2022-2023 08/02/2023 101/KSD BUILD-TECH Work order for "Providing Functional house hold tap connections for Sajal Gram Village within Kalna-I Block under Kalna Sub-Division under Burdwan Division, PHE Dte. (Dharmadanga Water Supply Scheme) Sl No- 5". 0.88
4 Burdwan Division ORD/000683/2022-2023 08/02/2023 102/KSD BABUL SK Work order for "Providing Functional house hold tap connections for Sajal Gram Village within Kalna-II Block under Kalna Sub-Division under Burdwan Division, PHE Dte. (Tehata Water Supply Scheme)" 0.88
5 Burdwan Division ORD/000686/2022-2023 08/02/2023 103/KSD MOMINUL ISLAM MONDAL Work Order for "Providing Functional house hold tap connections for Sajal Gram Village within Purbasthali-I Block under Kalna Sub-Division under Burdwan Division, PHE Dte. (Nadanghat & others scheme)" Sl No- 7 0.88
6 Burdwan Division ORD/000134/2024-2025 07/06/2024 1015/BSD DEBASHISH ENTERPRISE Improvement of 300cum. OHR (Concreting,Plastering,Primer and Painting) for Abujhati PWSS under Jamalpur Block under Burdwan Division PHE Dte. 2.01
7 Burdwan Division ORD/000321/2024-2025 22/07/2024 2857/BWD SUSUNIA GP CO. OPERATIVE LABOUR CONTRACT AND CONSTRUCTION SOCIETY LTD. Construction of Boundary wall at HEAD WORK Site & 2nd TW site & Culvert at Head work site & Interconnection between Head work site distribution line 2nd Tw site of DURGADANGA Piped Water Supply Scheme under MEMARI-I Block of Burdwan Division, PHE Dte. ( 39.17
8 Burdwan Division ORD/000285/2024-2025 11/07/2024 2724/BWD ESCON INDIA Improvement works including repairing & remodelling of Borshul Inspection Banglow under Augmentation of BORSHUL (Zone-II) PWSS in Bardhaman-II Block. (SM/10481) within Burdwan Division PHE Dte. 15.27
9 Burdwan Division ORD/000337/2024-2025 23/07/2024 2898/BWD HORIZEN Digital structuration of pipeline alignment and asset evaluation including holistic design, preparation of design drawings of overall LDS & preparation of estimate for 14 Nos. Piped W/S. Schemes under Purbasthali I Block under Kalna Sub-Division under Bur 38.00
10 Burdwan Division ORD/000338/2024-2025 23/07/2024 2899/BWD HORIZEN Digital structuration of pipeline alignment and asset evaluation including holistic design, preparation of design drawings of overall LDS & preparation of estimate for 09 Nos. Piped W/S. Schemes under Purbasthali II Block under Kalna Sub-Division under Bu 23.70
11 Burdwan Division ORD/000334/2024-2025 23/07/2024 2895/BWD PREMANANDA ROY BISWAS Different works related (sinking of Tube-wells at Maro Dakshin Para, LDSs, Interconnections, FHTCs, Construction of MARO Piped Water Supply Scheme for obstruction of Railway under Galsi-I Block, of Durgapur Sub Division, under Burdwan Division, PHE. Dte. 57.60
12 Burdwan Division ORD/000335/2024-2025 23/07/2024 2896/BWD HORIZEN Digital structuration of pipeline alignment and asset evaluation including holistic design, preparation of design drawings of overall LDS & preparation of estimate for 11 Nos. Piped W/S. Schemes under Kalna I Block under Kalna Sub-Division under Burdwan D 29.60
13 Burdwan Division ORD/001443/2020-2021 29/01/2021 105/KSD H SAMANTA Work Order for Operation & Maintenance of Distribution System , Sluice Valves, S.S. posts etc. including operation of sluice valves of Lohana (Chuadanga) Piped W/S. Scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. [Period from 01.02.202 3.13
14 Burdwan Division ORD/001208/2023-2024 30/10/2023 4635/BWD A.K. SIKDAR Engagement of Laboratory personnel (Analyst and Sampling Assistant) at various Water Testing Laboratories under Burdwan Division, PHE Dte., Purba Bardhaman. [Period For Four Months, i.e. 01.11.2023 to 28.02.2024]. 6.42
15 Burdwan Division ORD/000146/2024-2025 10/06/2024 1035/BSD MUKHERJEE ENTERPRISE Providing 19 Nos. FHTC at DHOLAN & FAGUPUR village for declaration of SWAJALGRAM under ISHUFABAD Piped Water Supply Scheme, Block- Burdwan-I within Burdwan Sub Division under Burdwan Division PHE Dte. 0.91
16 Burdwan Division ORD/000336/2024-2025 23/07/2024 2897/BWD HORIZEN Digital structuration of pipeline alignment and asset evaluation including holistic design, preparation of design drawings of overall LDS & preparation of estimate for 03 Nos. Piped W/S. Schemes under Kalna II Block under Kalna Sub-Division under Burdwan 7.55
Total 227.84