Sl. No. | Division
Working Divisions
|
System Order No
System generated Order No. for the Work Order as per PHED-MIS
|
Order Date
Date of Issuance of the Work Order as per PHED-MIS
|
Memo Number
Memo no. for Work Order Provided by the Divisions as per PHED-MIS
|
Vendor Name
Vendor Appointed Against this Work Order as per PHED-MIS
|
Work Name
Name of the Work as per the Issued Work Order
|
Order Value
Value of Work as mentioned in the Work Order
|
---|---|---|---|---|---|---|---|
14 | 32.77 | ||||||
1 | Hooghly Division | ORD/001295/2024-2025 | 20/01/2025 | 67/SER | DILIP KUMAR GHOSH | Repairing & Renovation work of Switch Room cum Godown, Boundary Wall at Mollerber HW SITE at Mollerber under Purba Tajpur water supply scheme Under Serampore Sub-Division of Hooghly Division P.H.E. Dte. | 4.31 |
2 | Hooghly Division | ORD/001301/2024-2025 | 20/01/2025 | 73/SER | JOY GURU ENTERPRISE | Construction of structural shed for storing Mechanical pumps and machineries at Garalgacha OHR work site under Chanditala PWSS under Serampur Sub division within Hooghly Division PHE Dte. | 4.88 |
3 | Hooghly Division | ORD/001302/2024-2025 | 20/01/2025 | 74/SER | M/S RAJKUMAR KHAN | Estimate for construction of 2 nos Toilets at Piarapur Pump House No-2 and Krishnarampur Pump Hose No-2 under Chanditala PWSS under Serampore Sub - Division of Hooghly Division P.H.E. Dte. | 3.91 |
4 | Hooghly Division | ORD/001304/2024-2025 | 20/01/2025 | 76/SER | CHAKRABORTY ENTERPRISE | Estimate for jack pushing of Road due to interconnection of Existing pipeline to 3rd Pump House of Krishnarampur under Chanditala W/S Supply scheme under Serampore Sub-Division of Hooghly Division P.H.E.Dte. | 3.93 |
5 | Hooghly Division | ORD/001300/2024-2025 | 20/01/2025 | 72/SER | TOTON MONDAL | Construction of structural shed for storing Mechanical pumps and machineries at Chanditala OHR work site under Serampur Sub division within Hooghly Division PHE Dte. | 4.88 |
6 | Hooghly Division | ORD/001479/2023-2024 | 14/03/2024 | 287/Arg | TITAS CONSTRUCTION | Restoration of damaged pipe line of Arandi water supply scheme due to construction of drain by Arandi-I G.P. under Arambagh Sub-Division, P.H.E. Dte. (PART-A) [Block-Arambagh] | 0.96 |
7 | Hooghly Division | ORD/000506/2024-2025 | 11/12/2024 | 289/HQ/HUG | LAB ANALYTICS | SUPPLY AND DELIVERY OF CHEMICALS AND CONSUMABLES REQUIRED FOR DISTRICT WATER TESTING LABORATORIES UNDER HOOGHLY DIVISION, P.H.E. DTE. | 0.65 |
8 | Hooghly Division | ORD/001480/2023-2024 | 14/03/2024 | 288/Arg | TITAS CONSTRUCTION | Restoration of damaged pipe line of Arandi water supply scheme due to construction of drain by Arandi-I G.P. under Arambagh Sub-Division, P.H.E. Dte. (PART-B) [Block-Arambagh] | 0.84 |
9 | Hooghly Division | ORD/000423/2024-2025 | 28/11/2024 | 993/CH | P. B. ENTERPRISE(PINTU BHADURI) | 19TH Continuation Deployment of 4(four) nos. Security Guard without arm for Guarding Arrangement of office cum Store at POLBA W/S Scheme under Chinsurah Sub-Division, under Hooghly Division, P.H.E Dte. Period 1 month from 01.12.2024 to 31.12.2024. | 0.87 |
10 | Hooghly Division | ORD/000424/2024-2025 | 28/11/2024 | 994/CH | P. B. ENTERPRISE(PINTU BHADURI) | 19TH Continuation Deployment of 4(four) nos. Security Guard without arm for Guarding Arrangement of office cum Store at SOMRA W/S Scheme under Chinsurah Sub-Division, under Hooghly Division, P.H.E Dte. Period 1 month from 01.12.2024 to 31.12.2024. | 0.87 |
11 | Hooghly Division | ORD/000427/2024-2025 | 30/10/2024 | 920/CH | DAS ENTERPRISE (SAMIR DAS) | 2nd Continuation of Operation & Maintenance of OHR, Laying Distribution System including Street Stand post, FHTC, Rising main & other essential components of Dumurdaha W/S Scheme for the period from 01/11/2024 to 31/12 /2024 under Chinsurah Sub-Division | 0.88 |
12 | Hooghly Division | ORD/001293/2024-2025 | 20/01/2025 | 65/SER | M/S RAJKUMAR KHAN | Repairing & Renovation work of 2 nos Switch Room,Office Cum Godown at Seakhala under Chanditala water supply scheme Under Serampore Sub-Division of Hooghly Division P.H.E. Dte. | 4.14 |
13 | Hooghly Division | ORD/000433/2024-2025 | 23/08/2024 | 804/Arg | APEX ENGINEERING | Revised Geo-reference drawing (CAD-GIS) and redsign of Network Distribution System of Gopalbati Water Supply Scheme Under Arambagh Sub-Division of Hooghly Division P.H.E Dte . | 0.83 |
14 | Hooghly Division | ORD/000434/2024-2025 | 23/08/2024 | 805/Arg | APEX ENGINEERING | Revised Geo-reference drawing (CAD-GIS) and redsign of Network Distribution System of Mayapur Water Supply Scheme Under Arambagh Sub-Division of Hooghly Division P.H.E Dte . | 0.83 |
Total | 32.77 |