No. of unauthorized work order
Exception Report Showing the Status of Major Pending Works for the Divisions

Update Data
Rs. in Lakh
Showing 1 to 11 of 11 entries
Sl. No.Division
Working Divisions
System Order No
System generated Order No. for the Work Order as per PHED-MIS
Order Date
Date of Issuance of the Work Order as per PHED-MIS
Memo Number
Memo no. for Work Order Provided by the Divisions as per PHED-MIS
Vendor Name
Vendor Appointed Against this Work Order as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Order Value
Value of Work as mentioned in the Work Order
11 239.76
Sl. No.
Division
Working Divisions
System Order No
System generated Order No. for the Work Order as per PHED-MIS
Order Date
Date of Issuance of the Work Order as per PHED-MIS
Memo Number
Memo no. for Work Order Provided by the Divisions as per PHED-MIS
Vendor Name
Vendor Appointed Against this Work Order as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Order Value
Value of Work as mentioned in the Work Order
11
239.76
Total
239.76
1 Durgapur W/S Division ORD/000527/2022-2023 20/05/2022 799/DWSD M/S KALYANI ENTERPRISE Continuation order for the work of providing water supply arrangement at different places to combect water crisis at Durgapur-Faridpur Block of Gogla and Gourbazar GP under Durgapur W/s Division, PHE Dte. (w.e.f - 23.05.2022 to 30.05.2022) 4.96
2 Durgapur W/S Division ORD/000526/2022-2023 31/05/2022 878/DWSD M/S KALYANI ENTERPRISE Continuation order for the work of providing water supply arrangement at different places to combect water crisis at Durgapur-Faridpur Block of Pratappur, Loudoha, Gogla and Gourbazar GP under Durgapur W/s Division, PHE Dte. (w.e.f - 01.06.2022 to 30.06 4.83
3 Durgapur W/S Division ORD/000512/2022-2023 20/02/2023 329/DWSD MAA KHEPIMAYER CHARANE Acceptance cum formal order for the work of Construction of 5.40 X3.60 mtr switch room with plinth height (600X 2000 mm) with sanitary and water supply arrangemnt at PH No-3 TW No-3 site of Augmentation of Roopganj piped W/S Scheme under DWSD ,PHE Dte. 6.90
4 Durgapur W/S Division ORD/000188/2023-2024 31/07/2023 1237/DWSD MEASURE LAND Acceptance cum formal order for the work of Preparation and Submission of DPR for Augmentation of KRISHNAPUR (PART - B) under DURGAPUR-FARIDPUR Block under Durgapur Water Supply Division, P.H.E Dte. (Sl No -07) 0.78
5 Durgapur W/S Division ORD/000189/2023-2024 31/07/2023 1236/DWSD MEASURE LAND Acceptance cum formal order for the work of Preparation and Submission of DPR for Augmentation of KANCHANPUR (PART - B) under DURGAPUR-FARIDPUR Block under Durgapur Water Supply Division, P.H.E Dte. (Sl No -08) 0.78
6 Durgapur W/S Division ORD/000178/2023-2024 22/06/2023 916/DWSD CARTO Acceptance cum formal order for the work of Preparation and Submission of DPR for Augmentation of KANCHANPUR PWSS under KANKSA Development Block under Durgapur Water Supply Division, P.H.E Dte. (Sl No - 03) 0.78
7 Durgapur W/S Division ORD/000179/2023-2024 22/06/2023 917/DWSD MEASURE LAND Acceptance cum formal order for the work of Preparation and Submission of DPR for Augmentation of TILAKCHANDRAPUR PWSS under KANKSA Development Block under Durgapur Water Supply Division, P.H.E Dte. (Sl No-04) 0.78
8 Durgapur W/S Division ORD/000181/2023-2024 23/06/2023 924/DWSD CARTO Acceptance cum formal order for the work of Preparation and Submission of DPR for Augmentation of SARPI PWSS under DURGAPUR-FARIDPUR Development Block under Durgapur Water Supply Division, P.H.E Dte. (Sl No -06) 0.78
9 Durgapur W/S Division ORD/000180/2023-2024 22/06/2023 918/DWSD CARTO Acceptance cum formal order for the work of Preparation and Submission of DPR for Augmentation of KRISHNAPUR PWSS under KANKSA Development Block under Durgapur Water Supply Division, P.H.E Dte. (Sl No - 05) 0.78
10 Durgapur W/S Division ORD/000194/2023-2024 14/08/2023 2937/HD S.S.CONSTRUCTION Bullah Piling (7.5m) toward the right side of boundary wall at Tiorpara (Zone-10) of surface based water supply scheme of Shyampur I & II , Part of Bagnan I & II and Uluberia-I Block under Howrah Division, PHE Dte. 0.97
11 Durgapur W/S Division ORD/000177/2023-2024 22/06/2023 915/DWSD MEASURE LAND Acceptance cum formal order for the work of Preparation and Submission of DPR for Augmentation of BASUDHA PWSS under KANKSA Development Block under Durgapur Water Supply Division, P.H.E Dte. (Sl No - 02) 217.43
Total 239.76
Showing 1 to 11 of 11 entries