Sl. No. | Division
Working Divisions
|
Bill Number | Bill Date
Date of Issuance of the Work Order as per PHED-MIS
|
Vendor Name
Vendor Appointed Against this Work Order as per PHED-MIS
|
System Order Number
System generated Order No. for the Work Order as per PHED-MIS
|
Memo Number
Memo no. for Work Order Provided by the Divisions as per PHED-MIS
|
Order Date
Date of Issuance of the Work Order as per PHED-MIS
|
work_name
Name of the Work as per the Issued Work Order
|
Bill Gross Amount | Voucher Number | Voucher Date | System Voucher Number |
---|---|---|---|---|---|---|---|---|---|---|---|---|
0 | 4,706.38 | |||||||||||
1 | Alipurduar Division | BILL/00291/2024-2025 | 03/09/2024 | SHYAMAL ROY | ORD/000520/2022-2023 | 3473/ALD | 22/03/2023 | Boring of TW, Construction of PH, B/Wall and LDS for Augmentation of Gargenda PWSS under Alipurduar Division, PHE Dte. | 18.74 | 187/24-25/PFMS | 07/09/2024 | VCH/000210/2024-2025 |
2 | Alipurduar Division | BILL/00318/2024-2025 | 05/09/2024 | ANUGRAH CONSTRUCTION PRIVATE LIMITED | ORD/000464/2022-2023 | 3000/ALD | 06/02/2023 | Tube well boring by ODEX-165, Construction of pump house and boundary wall including laying distribution system with new UPVC pipeline with rising and delivery line connection, Providing FHTC and other allied works for KUMARGRAM PWSS under Alipurduar Divi | 221.27 | 191/24-25/PFMS | 10/09/2024 | VCH/000212/2024-2025 |
3 | Alipurduar Division | BILL/00370/2024-2025 | 25/09/2024 | MONORAMA ENTERPRISE | ORD/000034/2023-2024 | 365/ALD | 18/05/2023 | Construction of pump house & sinking of 250 mm x 200 mm x 150mtr Big dia Tubewell at 2nd site of Bhatibari Zone-IV PWSS under Alipurduar Division, PHE Dte. | 7.64 | 228/24-25/PFMS | 27/09/2024 | VCH/000287/2024-2025 |
4 | Alipurduar Division | BILL/00384/2024-2025 | 26/09/2024 | DIPAK DAS | ORD/000462/2023-2024 | 161/ALD | 11/01/2024 | Hiring of Diesel Vehicle Maxi Cab(At least 7 seater ) for Assistant Engineer, Head Quarter, Alipurduar Division, P.H.E. Dte.(from 01.01.2024 to 31.12.2024) | 0.38 | 237/24-25/PFMS | 30/09/2024 | VCH/000295/2024-2025 |
5 | Alipurduar Division | BILL/00431/2024-2025 | 30/09/2024 | D. K. & SONS | ORD/000042/2023-2024 | 388/ALD | 19/05/2023 | Laying of DI & HDPE pipeline from Santali TG and Malangi TG to the existing OHR at Hasimara PWSS area, kalchini Block under Alipurduar division, PHE Dte. | 13.59 | 292/24-25/PFMS | 05/10/2024 | VCH/000360/2024-2025 |
6 | Alipurduar Division | BILL/00434/2024-2025 | 30/09/2024 | DILIP MAHATO | ORD/000511/2023-2024 | 829/ALD | 14/03/2024 | Laying of rising main, delivery main, bypass arrangement, Laying of HDPE Pipeline for left out household connection and other allied works at Dhanirampur PWSS (both H/W and 2nd site) of Birpara Sub-Division under Alipurduar Division, P.H.E. Dte. (SM/15208 | 47.31 | 286/24-25/PFMS | 04/10/2024 | VCH/000354/2024-2025 |
7 | Alipurduar Division | BILL/00437/2024-2025 | 30/09/2024 | DILIP MAHATO | ORD/000553/2022-2023 | 3575/ALD | 27/03/2023 | Boring of TW, Cons. Of Pump House, boundary wall, OHR (300 cum) inclu. Soil investigation works, Laying of rising main, distribution system and providing FHTC for MADHYA KHAIRBARI PWSS under Alipurduar Division PHE DTE. | 76.33 | 288/24-25/PFMS | 05/10/2024 | VCH/000356/2024-2025 |
8 | Alipurduar Division | BILL/00440/2024-2025 | 30/09/2024 | DILIP MAHATO | ORD/000022/2023-2024 | 258/ALD | 08/05/2023 | Soil investigation at OHR site, constructions of 300 Cum OHR at HW , distribution line and providing FHTC as per Departmental Design & drawing for Khagenhat PWSS Under Birpara Subdivision, Alipurduar Division PHE DTE. | 25.10 | 279/24-25/PFMS | 04/10/2024 | VCH/000315/2024-2025 |
9 | Alipurduar Division | BILL/00441/2024-2025 | 30/09/2024 | DILIP MAHATO | ORD/000172/2023-2024 | 1046/ALD | 20/07/2023 | Construction of tubewells (2 nos.) by Reverse rotary method of drilling , soil investigation at OHR site, constructions of 450 Cum OHR at HW , construction of pump house and boundary wall at HW site and 2nd site, laying of rising main, distribution line | 71.87 | 281/24-25/PFMS | 04/10/2024 | VCH/000349/2024-2025 |
10 | Alipurduar Division | BILL/00443/2024-2025 | 30/09/2024 | BHAGWATI BHUJEL | ORD/000341/2023-2024 | 2542/ALD | 28/11/2023 | Rising Main, Laying of DI (K7), gap filling of HDPE pipe, construction of sluice valve chamber for washout purpose in the command area of Malsagaon PWSS under Alipurduar Division, PHE Dte. | 2.08 | 280/24-25/PFMS | 04/10/2024 | VCH/000348/2024-2025 |
11 | Alipurduar Division | BILL/00461/2024-2025 | 01/10/2024 | ACHINTA SAHA | ORD/000132/2023-2024 | 637/ALD | 06/06/2023 | Cons of PH AND TW Boring by ODEX-165 drilling at HW site and 2nd site , LDS with HDPE P/LINE INCL RM and delivery connection , CONS of 100 Cum OHR along with the Soil investigation works , providing FHTC and others for Jayanti Tea Garden-II PW | 15.83 | 314/24-25/PFMS | 05/10/2024 | VCH/000375/2024-2025 |
12 | Alipurduar Division | BILL/00470/2024-2025 | 02/10/2024 | GIRIRAJ ENTERPRISE | ORD/000502/2022-2023 | 3324/ALD | 13/03/2023 | Boring of TW, Construction of Pumphouse, Boundary wall, Laying of Distribution system for Augmentation of Dhumchipara PWSS under Alipurduar Division, PHE Dte. | 6.80 | 282/24-25/PFMS | 04/10/2024 | VCH/000350/2024-2025 |
13 | Alipurduar Division | BILL/00471/2024-2025 | 02/10/2024 | M/S MRITYUNJAY PAUL AND SONS | ORD/000573/2022-2023 | 3634/ALD | 31/03/2023 | Construction of tube wells (2 nos.) by Reverse rotary method of drilling at HW site and 2nd TW site , constructions of 200 Cum OHR at HW including soil investigation , construction of pump house and boundary wall at H/W and 2nd site, laying of rising mai | 50.91 | 283/24-25/PFMS | 04/10/2024 | VCH/000351/2024-2025 |
14 | Alipurduar Division | BILL/00285/2024-2025 | 30/08/2024 | HARIDAS GHOSH | ORD/000369/2023-2024 | 85/ALD | 10/01/2024 | Laying of rising main line with HDPE PN10, horizontal boring by HDD method , bridge and culvert crossing, Supply of DI pipe and specials, construction of pathway, surface drain and chatal, installation of paver block, land development along with the other | 42.19 | 178/24-25/PFMS | 05/09/2024 | VCH/000201/2024-2025 |
15 | Alipurduar Division | BILL/00324/2024-2025 | 11/09/2024 | M/S T M CONSTRUCTION | ORD/000183/2023-2024 | 1172/ALD | 03/08/2023 | Construction of tubewells (2 nos.) by Reverse rotary method of drilling at HW site and 2nd TW site , soil investigation at OHR site, constructions of 300 Cum OHR at HW , construction of pump house and boundary wall at H/W and 2nd site, laying of rising m | 76.20 | 200/24-25/PFMS | 18/09/2024 | VCH/000256/2024-2025 |
16 | Alipurduar Division | BILL/00328/2024-2025 | 11/09/2024 | MADHAB SAHA | ORD/000549/2022-2023 | 3572/ALD | 27/03/2023 | Boring of Tube Well, Construction of Pump House, Boundary Wall, OHR (100cum) including soil testing, Laying Of Rising Main, Distribution System and providing FHTC for Foskadanga PWSS Under Alipurduar Division, PHE Dte. | 56.98 | 193/24-25/PFMS | 13/09/2024 | VCH/000250/2024-2025 |
17 | Alipurduar Division | BILL/00336/2024-2025 | 18/09/2024 | MADHAB SAHA | ORD/000292/2022-2023 | 1646/ALD | 19/09/2022 | Laying distribution system with new HDPE pipeline (Part-H) with Rising Main and delivery line connection for SHRINATHPUR TG AREA PWSS under Alipurduar Division, PHE Dte. | 0.36 | 201/24-25/PFMS | 21/09/2024 | VCH/000257/2024-2025 |
18 | Alipurduar Division | BILL/00349/2024-2025 | 21/09/2024 | DEBAJYOTI SUTRADHAR | ORD/000576/2022-2023 | 3637/ALD | 31/03/2023 | Cons of PH and Sinking of 250 mm x 200 mm X 150 mtr Big dia TW at HW site , 2nd site and 3rd TW site LDS with UPVC p/line , cons of 100 Cum OHR incl the Soil investigation works providing FHTC and others allied works for Pakriguri PWSS Under Ali | 18.78 | 211/24-25/PFMS | 25/09/2024 | VCH/000267/2024-2025 |
19 | Alipurduar Division | BILL/00406/2024-2025 | 27/09/2024 | EFFLUENT AND WATERTREATMENT ENGINEERS PVT LTD | ORD/000345/2024-2025 | 3339/ALD | 20/09/2024 | Sinking of one no. Big dia Tube Well (250 x 200 x 150 mm dia 270mtr) by Modified DTH - ODEX method of Cha-Sundori Project (JJM- SM/10054) within Lankapara Tea Garden Area Piped Water Supply Scheme, Madarihat-Birpara block of Birpara Sub-Division under Al | 25.90 | 243/24-25/PFMS | 01/10/2024 | VCH/000316/2024-2025 |
20 | Alipurduar Division | BILL/00424/2024-2025 | 28/09/2024 | HARI CONSTRUCTION | ORD/000515/2023-2024 | 834/ALD | 14/03/2024 | Supply of DI specials and CI Jeffy coupling for Telipara Water Supply Scheme (SM/13303) of Kumargram Block under Alipurduar Division P.H.E. Dte. | 11.52 | 271/24-25/PFMS | 03/10/2024 | VCH/000340/2024-2025 |
21 | Alipurduar Division | BILL/00425/2024-2025 | 28/09/2024 | SHREE RANISATI ENTERPRISE | ORD/000009/2022-2023 | 3230/ALD. | 27/02/2023 | Construction of Pump House, Boundary Wall, Tube well Boring by ODEX-165 Method of drilling at H/W site including laying distribution system and providing FHTC for KALCHINI TG ZONE-I PWSS Under Alipurduar Division PHE DTE | 49.04 | 274/24-25/PFMS | 03/10/2024 | VCH/000343/2024-2025 |
22 | Alipurduar Division | BILL/00288/2024-2025 | 03/09/2024 | HARIDAS GHOSH | ORD/000497/2022-2023 | 3361/ALD | 14/03/2023 | Providing FHTC in school in Salsalabari PWSS under Alipurduar Division P.H.E Dte. | 0.29 | 183/24-25/PFMS | 07/09/2024 | VCH/000206/2024-2025 |
23 | Alipurduar Division | BILL/00313/2024-2025 | 03/09/2024 | TAPAN CHANDA | ORD/000338/2023-2024 | 2524/ALD | 24/11/2023 | Repairing of HW site boundary wall (40M), construction of pathway, surface drain, chatal and other misc works related to Narathali PWSS under Alipurduar Division, PHE Dte. | 5.33 | 185/24-25/PFMS | 07/09/2024 | VCH/000208/2024-2025 |
24 | Alipurduar Division | BILL/00361/2024-2025 | 24/09/2024 | AMIT BARDHAN | ORD/000476/2023-2024 | 694/ALD | 07/03/2024 | Construction of a pump house at Old Hasimara HW Site PWSS under Alipurduar Division, PHE Dte. | 4.87 | 221/24-25/PFMS | 27/09/2024 | VCH/000272/2024-2025 |
25 | Alipurduar Division | BILL/00364/2024-2025 | 25/09/2024 | MAHENDRA CHHETRI | ORD/000511/2022-2023 | 3398/ALD | 16/03/2023 | Tube well Boring by ODEX-165 Method of drilling at HW, FIRST TUBE WELL site including laying distribution system with new HDPE pipeline , Constructions of 150 Cum OHR as per Departmental Design & drawing , TWO nos. pump house & boundary wall, providing F | 25.69 | 229/24-25/PFMS | 27/09/2024 | VCH/000275/2024-2025 |
26 | Alipurduar Division | BILL/00374/2024-2025 | 25/09/2024 | ASHIM KUMAR GHOSH | ORD/000477/2022-2023 | 3194/ALD | 27/02/2023 | Tube well Boring by ODEX-165 Method drilling at HW, First TW Site including laying distribution system with new UPVC PIPELINE, Cons. of 150cum OHR as per departmental Design & drawing , 2nos Pump House & boundary wall, providing FHTC, soil investigation w | 28.27 | 227/24-25/PFMS | 27/09/2024 | VCH/000286/2024-2025 |
27 | Alipurduar Division | BILL/00379/2024-2025 | 26/09/2024 | TAPASH KUMAR BHOWMICK | ORD/000323/2023-2024 | 2420/ALD | 09/11/2023 | Tube well boring by ODEX-165 Method of drilling, Construction of Pump House, Boundary wall at proposed 3rd site of Turturi under Alipurduar Division, PHE Dte | 11.80 | 234/24-25/PFMS | 30/09/2024 | VCH/000292/2024-2025 |
28 | Alipurduar Division | BILL/00436/2024-2025 | 30/09/2024 | DILIP MAHATO | ORD/000199/2024-2025 | 1913/ALD | 26/06/2024 | Continuation work order for the work of "Sinking of Rig bore T/W (4nos.) by Reverse Rotary method of drilling, cons. of 100 cum. OHR (2nos), cons. of P/H and B/W, Rising main, distribution line and providing FHTC at H/W and 2nd site inclu. Soil testing fo | 14.37 | 290/24-25/PFMS | 05/10/2024 | VCH/000358/2024-2025 |
29 | Alipurduar Division | BILL/00444/2024-2025 | 30/09/2024 | SUDDHYA SING LAMA | ORD/000449/2022-2023 | 2920/ALD | 19/01/2023 | Tube well Boring by ODEX-195 Method of drilling of Constructions of 1no. pump house, boundary wall, distribution line with FHTC for Lankapara 20no. Line for Augmentation of Lankapara TG for Lonkapara Hat Area PWSS Under Birpara Sub-Division, Alipurduar Di | 11.00 | 315/24-25/PFMS | 05/10/2024 | VCH/000376/2024-2025 |
30 | Alipurduar Division | BILL/00445/2024-2025 | 30/09/2024 | DAS CONSTRUCTION | ORD/000050/2023-2024 | 406/ALD | 22/05/2023 | Cons. of pump house and Tube well Boring by ODEX-165 Method of drilling at HW site and 2nd site, LDS with HDPE pipeline including rising main and delivery connection, Cons. of 100 Cum OHR as per Dept. Design and drawing along with the Soil investigation | 80.04 | 278/24-25/PFMS | 04/10/2024 | VCH/000347/2024-2025 |
31 | Alipurduar Division | BILL/00448/2024-2025 | 30/09/2024 | SUDDHYA SING LAMA | ORD/000398/2022-2023 | 2661/ALD | 22/12/2022 | Soil investigation work for proposed overhead reservoir , Constructions of 150 Cum OHR at HW site and providing FHTC as per Departmental Design & drawing for Ramjhora PWSS Under Birpara Sub-division, Alipurduar Division PHE DTE. | 16.72 | 31724-25/PFMS | 05/10/2024 | VCH/000378/2024-2025 |
32 | Alipurduar Division | BILL/00283/2024-2025 | 30/08/2024 | EFFLUENT AND WATERTREATMENT ENGINEERS PVT LTD | ORD/000533/2023-2024 | 891/ALD | 15/03/2024 | Sinking of Big dia. Tubewell (200 x 150 mm dia.)By modified DTH -ODEX method of drilling at Dhumchipara-2nos. site (SM/09896 & SM/16824) of Birpara Sub-Division under Alipurduar Division, PHE Dte. | 5.65 | 174/24-25/PFMS | 05/10/2024 | VCH/000380/2024-2025 |
33 | Alipurduar Division | BILL/00350/2024-2025 | 21/09/2024 | PRANAB GHOSH | ORD/000265/2023-2024 | 1883/ALD | 07/09/2023 | Providing FHTC from existing distribution system as per specification for Bhatkhawa TG PWSS under Alipurduar Division, PHE Dte. | 7.10 | 215/24-25/PFMS | 27/09/2024 | VCH/000270/2024-2025 |
34 | Alipurduar Division | BILL/00405/2024-2025 | 27/09/2024 | KAMALESH ROY | ORD/000537/2023-2024 | 895/ALD | 15/03/2024 | Construction of 150cum OHR as per Departmental Design & drawing, laying of rising main & delivery connection, Supply of CIDF specials and others allied works for Bhatibari Zone -IV PWSS Under Alipurduar Division PHE Dte. | 32.93 | 251/24-25/PFMS | 01/10/2024 | VCH/000308/2024-2025 |
35 | Alipurduar Division | BILL/00412/2024-2025 | 27/09/2024 | TAPASH DAS | ORD/000162/2023-2024 | 966/ALD | 12/07/2023 | Providing Functional Tap Connection (FHTC) in connection with Jaldhara/JalSwapna (Schools, AWC and others) for Dalimpur PWSS under Alipurduar Division, PHE Dte. Part-3 | 4.52 | 264/24-25/PFMS | 01/10/2024 | VCH/000333/2024-2025 |
36 | Alipurduar Division | BILL/00413/2024-2025 | 27/09/2024 | SASANKA ROY | ORD/000560/2022-2023 | 3578/ALD | 27/03/2023 | Boring of Tube Well, Construction of Pump House, Boundary Wall, OHR, Laying Of Rising Main, Distribution System including soil test and providing FHTC for Kolaberia PWSS Under Alipurduar Division, PHE Dte | 47.76 | 249/24-25/PFMS | 01/10/2024 | VCH/000321/2024-2025 |
37 | Alipurduar Division | BILL/00362/2024-2025 | 25/09/2024 | MAHENDRA CHHETRI | ORD/000177/2023-2024 | 1113/ALD | 28/07/2023 | Constructions of 250 Cum OHR as per Departmental Design & drawing including laying distribution system with new HDPE pipeline, RISING MAIN, Construction of 2(TWO) NOS of BOUNDARY WALL, 3(THREE) NOS ODEX-165 TUBE WELL, 3(THREE) NOS PUMP HOUSE, Soil Invest | 134.83 | 231/24-25/PFMS | 27/09/2024 | VCH/000289/2024-2025 |
38 | Alipurduar Division | BILL/00365/2024-2025 | 25/09/2024 | MAHENDRA CHHETRI | ORD/000029/2022-2023 | 283/ALD | 26/04/2022 | CONS. OF RESERVOIR (100M3), BOUNDARY WALL (80 m), PUMPHOUSE( 1.Nos) ,TUBEWELL (2 Nos.), RISING MAIN AND LAND DEVELOPMENT FOR TORSHA (Sawa Line, Chetri Line, Bancha Line,Gopal Line, Jiten Line)220 unit CHA SUNDARAI WATER SUPPLY SCHEME UNDER ALIPURDUAR DIVI | 7.16 | 223/24-25/PFMS | 27/09/2024 | VCH/000282/2024-2025 |
39 | Alipurduar Division | BILL/00371/2024-2025 | 25/09/2024 | CAPITAL ENGINEERS | ORD/000175/2023-2024 | 1049/ALD | 20/07/2023 | Constructions of 300 Cum OHR as per Departmental Design & drawing, including laying distribution system with new HDPE pipeline , Rising Main, Soil Investigation work and others allied works for MALANGI TEA GARDEN AREA PWSS Under Alipurduar Division PHE | 52.22 | 266/24-25/PFMS | 01/10/2024 | VCH/000335/2024-2025 |
40 | Alipurduar Division | BILL/00372/2024-2025 | 25/09/2024 | MS DEYS CONSTRUCTION | ORD/000163/2022-2023 | 993/ALD | 15/07/2022 | Laying Distribution pipe with DI and UPVC pipe along with FHTC Connection surrounding Sirubari area, Purba Kathalbari WSS under Alipurduar Division, PHE Dte. | 21.57 | 225/24-25/PFMS | 27/09/2024 | VCH/000284/2024-2025 |
41 | Alipurduar Division | BILL/00373/2024-2025 | 25/09/2024 | NARENDRA BHADANI. | ORD/000530/2023-2024 | 849/ALD | 14/03/2024 | Laying of different dia., CIDF, DI, UPVC, HDPE Pipeline, Trenchless Pipe laying by HDD Process, HDPE pipe line for left out household connection, Trial and run the entire PURBA KATHALBARI ZONE-4 PWSS Scheme with maintaining for 3 months after successfully | 18.80 | 226/24-25/PFMS | 27/09/2024 | VCH/000285/2024-2025 |
42 | Alipurduar Division | BILL/00380/2024-2025 | 26/09/2024 | DILIP MAHATO | ORD/000555/2022-2023 | 3576/ALD | 27/03/2023 | 3 nos. of Tube well Boring by ODEX-165 Method of drilling at HW site, 2nd TW and 3rd site site and Constructions of 350 Cum OHR at HW site inclu. soil testing , construction of pump house and boundary wall at H/W, 2nd site and 3rd site, laying of rising | 114.41 | 233/24-25/PFMS | 30/09/2024 | VCH/000291/2024-2025 |
43 | Alipurduar Division | BILL/00381/2024-2025 | 26/09/2024 | GHOSH & SAHA CONSTRUCTION | ORD/000466/2022-2023 | 3155/ALD | 22/02/2023 | Cons. of pump house and Sinking of 250 mm x 200 mm X 150 mtr. big dia. TW at HW site and 2nd site, LDS with UPVC pipeline, Cons. of 350 cum OHR as per Departmental Design & drawing , providing FHTC and others allied works for MADHYA KAMAKHYAGURI PWS | 84.15 | 235/24-25/PFMS | 30/09/2024 | VCH/000293/2024-2025 |
44 | Alipurduar Division | BILL/00385/2024-2025 | 26/09/2024 | DIPAK DAS | ORD/000462/2023-2024 | 161/ALD | 11/01/2024 | Hiring of Diesel Vehicle Maxi Cab(At least 7 seater ) for Assistant Engineer, Head Quarter, Alipurduar Division, P.H.E. Dte.(from 01.01.2024 to 31.12.2024) | 0.36 | 239/24-25/PFMS | 30/09/2024 | VCH/000296/2024-2025 |
45 | Alipurduar Division | BILL/00442/2024-2025 | 30/09/2024 | DILIP MAHATO | ORD/000434/2022-2023 | 2861/ALD | 17/01/2023 | Cons. of Rig bored TW(2nos) by Reverse Rotary method of drilling at HW and 2nd site, cons of 200 cum OHR at HW including soil testing, cons. of P/H and B/W at HW,2nd site, Laying of rising main, distribution line and providing FHTC as per Departmental D | 82.10 | 287/24-25/PFMS | 05/10/2024 | VCH/000355/2024-2025 |
46 | Alipurduar Division | BILL/00459/2024-2025 | 01/10/2024 | ALIPURDUAR CO-OPERATIVE LABOUR CONTRUCT & CONSTRUCTION SOCIETY LTD. | ORD/000444/2022-2023 | 2873/ALD | 17/01/2023 | Providing Functional Tap Connection (FHTC) in connection with Jaldhara/JalSwapna (Schools, AWC and others) for BirparaZone-I (North) PWSS under Alipurduar Division, PHE Dte. Part-1 | 2.95 | 299/24-25/PFMS | 05/10/2024 | VCH/000312/2024-2025 |
47 | Alipurduar Division | BILL/00281/2024-2025 | 30/08/2024 | SHREE RANISATI ENTERPRISE | ORD/000009/2022-2023 | 3230/ALD. | 27/02/2023 | Construction of Pump House, Boundary Wall, Tube well Boring by ODEX-165 Method of drilling at H/W site including laying distribution system and providing FHTC for KALCHINI TG ZONE-I PWSS Under Alipurduar Division PHE DTE | 30.29 | 179/24-25/PFMS | 05/09/2024 | VCH/000202/2024-2025 |
48 | Alipurduar Division | BILL/00321/2024-2025 | 05/09/2024 | EXECUTIVE ENGINEER, ALIPURDUAR DIVISION | null | 3170/ALD | 05/09/2024 | Road Restoration of Volka Road against PURBA CHIKLIGURI PWSS | 8.85 | 190/24-25/PFMS | 10/09/2024 | VCH/000214/2024-2025 |
49 | Alipurduar Division | BILL/00348/2024-2025 | 21/09/2024 | HARI CONSTRUCTION | ORD/000516/2023-2024 | 835/ALD | 14/03/2024 | Supply of DI specials and CI Jeffy coupling for Raydak TG Water Supply Scheme(SM/12114) of Kumargram Block under Alipurduar Division P.H.E. Dte. | 8.28 | 212/24-25/PFMS | 25/09/2024 | VCH/000268/2024-2025 |
50 | Alipurduar Division | BILL/00399/2024-2025 | 27/09/2024 | MITHUN DAS | ORD/000367/2023-2024 | 83/ALD | 10/01/2024 | Construction of pump house, boundary wall, TW boring (by ODEX-165 method of drilling) and Rising main for 2nd TW site at Bandapani PWSS (Zone-II) under Alipurduar Division, PHE Dte. | 19.15 | 246/24-25/PFMS | 01/10/2024 | VCH/000318/2024-2025 |
51 | Alipurduar Division | BILL/00416/2024-2025 | 27/09/2024 | AASHIRBAD ENTERPRISE | ORD/000368/2022-2023 | 2612/ALD | 21/12/2022 | Construction of 1no. Boundary Wall and 2nos. Tube well Boring by Reverse Rotary Method of drilling for BHATIBARI ZONE-III and ZONE-IV PWSS Under Alipurduar Division PHE DTE. | 23.93 | 252/24-25/PFMS | 01/10/2024 | VCH/000309/2024-2025 |
52 | Alipurduar Division | BILL/00430/2024-2025 | 30/09/2024 | D. K. & SONS | ORD/000316/2023-2024 | 2184/ALD | 06/10/2023 | Providing balance FHTC from existing distribution system as per specification for BEECH TG PWSS under Alipurduar Division, PHE Dte. | 16.32 | 293/24-25/PFMS | 05/10/2024 | VCH/000361/2024-2025 |
53 | Alipurduar Division | BILL/00383/2024-2025 | 26/09/2024 | DIPAK DAS | ORD/000462/2023-2024 | 161/ALD | 11/01/2024 | Hiring of Diesel Vehicle Maxi Cab(At least 7 seater ) for Assistant Engineer, Head Quarter, Alipurduar Division, P.H.E. Dte.(from 01.01.2024 to 31.12.2024) | 0.35 | 238/24-25/PFMS | 30/09/2024 | VCH/000273/2024-2025 |
54 | Alipurduar Division | BILL/00387/2024-2025 | 26/09/2024 | DIPAK DAS | ORD/000462/2023-2024 | 161/ALD | 11/01/2024 | Hiring of Diesel Vehicle Maxi Cab(At least 7 seater ) for Assistant Engineer, Head Quarter, Alipurduar Division, P.H.E. Dte.(from 01.01.2024 to 31.12.2024) | 0.39 | 241/24-25/PFMS | 30/09/2024 | VCH/000298/2024-2025 |
55 | Alipurduar Division | BILL/00433/2024-2025 | 30/09/2024 | DILIP MAHATO | ORD/000492/2023-2024 | 748/ALD | 12/03/2024 | Laying of Rising main, delivery main, bypass arrangement, laying of HDPE pipeline for left out household connecting to Narasingpur PWSS (both H/W and 2nd site) (SM/15758) of Birpara Sub-Division under Alipurduar Division, PHE Dte. | 79.14 | 285/24-25/PFMS | 04/10/2024 | VCH/000353/2024-2025 |
56 | Alipurduar Division | BILL/00438/2024-2025 | 30/09/2024 | DILIP MAHATO | ORD/000430/2022-2023 | 2857/ALD | 17/01/2023 | Sinking of Rig bore T/W (4nos.) by Reverse Rotary method of drilling, cons. of 100 cum. OHR (2nos), cons. of P/H and B/W, Rising main, distribution line and providing FHTC at H/W and 2nd site inclu. Soil testing for KADAMBINI TG PWSS (ZONE-I and ZONE-II) | 100.33 | 291/24-25/PFMS | 05/10/2024 | VCH/000359/2024-2025 |
57 | Alipurduar Division | BILL/00449/2024-2025 | 01/10/2024 | GOUTAM KUMAR DAS | ORD/000514/2022-2023 | 3395/ALD | 16/03/2023 | Cons. of pump house and Sinking of 250 mm x 200 mm X 150 mtr. big dia. TW at HW site and 2nd site, LDS with UPVC pipeline, Cons. of 200 cum OHR as per Departmental Design & drawing including soil investigation works, providing FHTC and others allied wo | 36.00 | 309/24-25/PFMS | 05/10/2024 | VCH/000371/2024-2025 |
58 | Alipurduar Division | BILL/00456/2024-2025 | 01/10/2024 | DULAL DAS | ORD/000347/2022-2023 | 2493/ALD | 13/12/2022 | Construction of pump house, Boundary Wall, Tube well Boring (ODEX-165 method), rising main of 3rd TW site of Rahimabad WSS under Alipurduar Division, PHE Dte. | 8.56 | 304/24-25/PFMS | 05/10/2024 | VCH/000366/2024-2025 |
59 | Alipurduar Division | BILL/00467/2024-2025 | 01/10/2024 | DILIP MAHATO | ORD/000229/2024-2025 | 2282/ALD | 05/08/2024 | Laying of HDPE/DI pipe line near kohinur TG factory area for interconnection in the distribution system and bridge /culvert crossing , Construction of Pump House, Boundary Wall at Head work site of KOHINUR TEA GARDEN PWSS Alipurduar Sadar Sub-Division, un | 13.08 | 303/24-25/PFMS | 05/10/2024 | VCH/000365/2024-2025 |
60 | Alipurduar Division | BILL/00320/2024-2025 | 05/09/2024 | EXECUTIVE ENGINEER, ALIPURDUAR DIVISION | null | 3170/ALD | 05/09/2024 | Road Restoration of Volka Road against Brajerkuthi PWSS | 10.73 | 189/24-25/PFMS | 10/09/2024 | VCH/000213/2024-2025 |
61 | Alipurduar Division | BILL/00326/2024-2025 | 11/09/2024 | PRAPTI DUTTA | ORD/000337/2022-2023 | 2246/ALD | 21/11/2022 | Laying distribution system with new DI line and Supply of necessary specials, construction of sluice valve chamber, Construction of pump house and boundary wall at 2nd site of Shrinathpur TG Area PWSS under Alipurduar Division, PHE Dte. | 5.94 | 195/24-25/PFMS | 16/09/2024 | VCH/000249/2024-2025 |
62 | Alipurduar Division | BILL/00329/2024-2025 | 11/09/2024 | SHREE RANISATI ENTERPRISE | ORD/000263/2022-2023 | 1495/ALD | 05/09/2022 | Construction of 700cum OHR for Augmentation of DAKSHIN SONAPUR Water Supply Scheme under Alipurduar Division, PHE Dte. | 52.09 | 196/24-25/PFMS | 16/09/2024 | VCH/000252/2024-2025 |
63 | Alipurduar Division | BILL/00330/2024-2025 | 11/09/2024 | PROGRESSIVE UNEMPLOYED CO-OPERATIVE LABOUR CONTRACT & CONSTRUCTION SOCIETY LTD. | ORD/000556/2022-2023 | 3501/ALD | 23/03/2023 | Repairing of HW Site Boundary Wall (15M) Samuktala WSS under Alipurduar Division, PHE Dte. | 1.80 | 197/24-25/PFMS | 16/09/2024 | VCH/000253/2024-2025 |
64 | Alipurduar Division | BILL/00333/2024-2025 | 18/09/2024 | HARI CONSTRUCTION | ORD/000506/2022-2023 | 3365/ALD | 14/03/2023 | Supply , Fitting and Fixing of sign boards in different schemes under Alipurduar Division , P.H.E Dte. ( Part - A) | 0.94 | 203/24-25/PFMS | 21/09/2024 | VCH/000259/2024-2025 |
65 | Alipurduar Division | BILL/00335/2024-2025 | 18/09/2024 | KAMALESH ROY | ORD/000459/2023-2024 | 495/ALD | 16/02/2024 | Soil investigation at OHR site and construction of 450cum OHR at Zone-1 for Augmentation of Birpara PWSS under Alipurduar Divisionof North Bengal Circle-I, PHE Dte. | 29.90 | 204/24-25/PFMS | 21/09/2024 | VCH/000260/2024-2025 |
66 | Alipurduar Division | BILL/00337/2024-2025 | 18/09/2024 | GIRIRAJ ENTERPRISE | ORD/000502/2022-2023 | 3324/ALD | 13/03/2023 | Boring of TW, Construction of Pumphouse, Boundary wall, Laying of Distribution system for Augmentation of Dhumchipara PWSS under Alipurduar Division, PHE Dte. | 3.74 | 205/24-25/PFMS | 21/09/2024 | VCH/000261/2024-2025 |
67 | Alipurduar Division | BILL/00344/2024-2025 | 21/09/2024 | ASHOK PRADHAN | ORD/000189/2023-2024 | 1280/ALD | 11/08/2023 | Construction of boundary wall, pump house, tubewell, rising main for (Mouza- Lankapara TG, JL No. 30, Sheet No. 5, Plot No. 704) 327 units Cha Sundori Water Supply Scheme under Alipurduar Division PHE DTE. | 15.93 | 214/24-25/PFMS | 30/09/2024 | VCH/000271/2024-2025 |
68 | Alipurduar Division | BILL/00393/2024-2025 | 27/09/2024 | MS DEYS CONSTRUCTION | ORD/000477/2021-2022 | 2896/ALD | 08/03/2022 | Laying of distribution of HDPE/DI pipeline for Jogijhora Barabak PWSS under Alipurduar Division, PHE DTE. | 26.88 | 244/24-25/PFMS | 01/10/2024 | VCH/000317/2024-2025 |
69 | Alipurduar Division | BILL/00409/2024-2025 | 27/09/2024 | SOUVIK ROY PALADHI | ORD/000460/2022-2023 | 2981/ALD | 02/02/2023 | Tube well Boring by ODEX-165 Method of drilling at HW, FIRST TUBE WELL site including laying distribution system with new UPVC pipeline , Constructions of 250 Cum OHR as per Departmental Design & drawing including soil investigation works , 2nos pump hou | 50.51 | 250/24-25/PFMS | 01/10/2024 | VCH/000322/2024-2025 |
70 | Alipurduar Division | BILL/00422/2024-2025 | 28/09/2024 | SHREE RANISATI ENTERPRISE | ORD/000565/2022-2023 | 3234ALD | 27/02/2023 | Construction of 500cum OHR for Kalchini TG Water Supply Scheme under Alipurduar Division, PHE Dte. | 41.04 | 275/24-25/PFMS | 03/10/2024 | VCH/000344/2024-2025 |
71 | Alipurduar Division | BILL/00429/2024-2025 | 30/09/2024 | ALIPURDUAR CO-OPERATIVE LABOUR CONTRUCT & CONSTRUCTION SOCIETY LTD. | ORD/000017/2023-2024 | 235/ALD | 04/05/2023 | Boring of Tube Well by reverse rotary method, Construction of Pump House, Boundary Wall, Laying Of Distribution System and providing FHTC for Parpatlakhawa PWSS under Alipurduar Division, PHE Dte. | 28.32 | 277/24-25/PFMS | 04/10/2024 | VCH/000346/2024-2025 |
72 | Alipurduar Division | BILL/00290/2024-2025 | 03/09/2024 | GOUTAM KUMAR DAS | ORD/000258/2022-2023 | 1489/ALD | 05/09/2022 | Construction of 250cum OHR for KUMARGRAM ZONE-I Water Supply Scheme under Alipurduar Division, PHE Dte. | 25.70 | 184/24-25/PFMS | 07/09/2024 | VCH/000207/2024-2025 |
73 | Alipurduar Division | BILL/00311/2024-2025 | 03/09/2024 | SWAPAN MALAKAR | ORD/000289/2023-2024 | 1903/ALD | 07/09/2023 | Construction of boundary wall (remaining portion) at Headwork site under Samuktala Zone-III PWSS under Alipurduar Division, PHE Dte. | 5.93 | 192/24-25/PFMS | 12/09/2024 | VCH/000196/2024-2025 |
74 | Alipurduar Division | BILL/00319/2024-2025 | 05/09/2024 | EFFLUENT AND WATERTREATMENT ENGINEERS PVT LTD | ORD/000232/2024-2025 | 2292/ALD | 06/08/2024 | Supply of MSREW Pipe for modified DTH - ODEX of drilling at Site no. 01 of GARGENDA TE of RWS SUB-Division under Alipurduar Division, PHE Dte.(SM/16824) | 7.43 | 188/24-25/PFMS | 10/09/2024 | VCH/000211/2024-2025 |
75 | Alipurduar Division | BILL/00359/2024-2025 | 24/09/2024 | TAPASH KUMAR BHOWMICK | ORD/000339/2023-2024 | 2540/ALD | 28/11/2023 | Construction of balance portion of boundary wall, pathway, surface drain and chatal, land development, laying of rising main line & delivery line connection along with the other allied works at Putimari PWSS adj. To Uttar Dhalkar PWSS under Alipurduar Div | 20.77 | 219/24-25/PFMS | 27/09/2024 | VCH/000279/2024-2025 |
76 | Alipurduar Division | BILL/00360/2024-2025 | 24/09/2024 | BHAGWATI BHUJEL | ORD/000468/2023-2024 | 674/ALD | 06/03/2024 | Supply of CIPE Special & CI Jeffy Coupling for Augmentation of Kohinur TG Water Supply Scheme under Alipurduar Division P.H.E. Dte.(SM/12113) | 1.66 | 220/24-25/PFMS | 27/09/2024 | VCH/000280/2024-2025 |
77 | Alipurduar Division | BILL/00363/2024-2025 | 25/09/2024 | MADHAB SAHA | ORD/000550/2022-2023 | 3573ALD | 27/03/2023 | Constructions of pump house & Tube well Boring by ODEX-165 Method of drilling at HW site & 2nd site , laying of distribution system with UPVC pipeline including rising main & delivery connection, Constructions of 250 Cum OHR as per Departmental Desig | 16.87 | 230/24-25/PFMS | 27/09/2024 | VCH/000288/2024-2025 |
78 | Alipurduar Division | BILL/00450/2024-2025 | 01/10/2024 | HARIDAS GHOSH | ORD/000196/2024-2025 | 1766/ALD | 07/06/2024 | Construction of 250cum OHR as per Departmental Design, laying of rising main & delivery connection . Supply of CIDF Specials and others allied works for Bhatibari Z-III PWSS Under Alipurduar Division PHE Dte. | 37.39 | 311/24-25/PFMS | 05/10/2024 | VCH/000310/2024-2025 |
79 | Alipurduar Division | BILL/00601/2023-2024 | 29/02/2024 | HARIDAS GHOSH | null | 611/ALD | 29/02/2024 | Construction of Pump House ,Boundary Wall and Providing FHTC including Laying of UPVC pipeline and Tube well Boring by ODEX-165 Method of drilling for Bholardabri PWSS under Alipurduar Division PHE DTE.(2382/ALD DT:31/01/2022) Construction of 450cum OHR | 2.68 | 11 | 12/11/2024 | VCH/000683/2023-2024 |
80 | Alipurduar Division | BILL/00286/2024-2025 | 30/08/2024 | CAPITAL ENGINEERS | ORD/000176/2023-2024 | 1112/ALD | 28/07/2023 | Cons. 4 nos Tube well boring by ODEX-165 Method of drilling at HW site including distribution system with new HDPE pipeline, Cons. of 250 cum OHR as per Departmental Design & drawing, Pump House , Boundary Wall, Path way, Providing FHTC, Soil Testing and | 103.94 | 181/24-25/PFMS | 05/09/2024 | VCH/000204/2024-2025 |
81 | Alipurduar Division | BILL/00323/2024-2025 | 11/09/2024 | M/S DUTTA AND CO | ORD/000413/2021-2022 | 2581/ALD | 17/02/2022 | Construction of 450cum OHR for Augmentation of Uttar Majher Dabri Water Supply Scheme under Alipurduar Division, PHE Dte. | 35.91 | 198/24-25/PFMS | 18/09/2024 | VCH/000254/2024-2025 |
82 | Alipurduar Division | BILL/00334/2024-2025 | 18/09/2024 | HARI CONSTRUCTION | ORD/000504/2022-2023 | 3366/ALD | 14/03/2023 | Supply , Fitting and Fixing of sign boards in different schemes under Alipurduar Division , P.H.E Dte. ( Part - B) | 0.49 | 202/24-25/PFMS | 20/09/2024 | VCH/000258/2024-2025 |
83 | Alipurduar Division | BILL/00346/2024-2025 | 21/09/2024 | MAHENDRA CHHETRI | ORD/000539/2023-2024 | 896/ALD | 15/03/2024 | Gap filling of HDPE pipeline along with construction of platform at Jaigaon Zone-II under Alipurduar Division PHE Dte. | 69.07 | 209/24-25/PFMS | 25/09/2024 | VCH/000265/2024-2025 |
84 | Alipurduar Division | BILL/00351/2024-2025 | 21/09/2024 | MONORAMA ENTERPRISE | ORD/000338/2022-2023 | 2247/ALD | 21/11/2022 | Laying distribution system with new DI line and Supply of necessary specials, construction of sluice valve chamber, Construction of pump house and boundary wall at 2nd site of Kartika TG Area PWSS under Alipurduar Division, PHE Dte. | 9.70 | 210/24-25/PFMS | 25/09/2024 | VCH/000266/2024-2025 |
85 | Alipurduar Division | BILL/00353/2024-2025 | 21/09/2024 | EFFLUENT AND WATERTREATMENT ENGINEERS PVT LTD | ORD/000209/2024-2025 | 1825/ALD | 14/06/2024 | Making arrangement for pumping test with suitable pump and required column pipes etc. including all charges at 6 locations. | 5.32 | 0000 | 13/11/2024 | VCH/000382/2024-2025 |
86 | Alipurduar Division | BILL/00355/2024-2025 | 24/09/2024 | BILTU DAS | ORD/000366/2020-2021 | 1759/ALD | 19/02/2021 | Providing House connection for RABINDRANAGAR, FALAKATA AUG. PWSS ZONE-III under Alipuduar Division, P.H.E. Dte. | 25.17 | 216/24-25/PFMS | 27/09/2024 | VCH/000276/2024-2025 |
87 | Alipurduar Division | BILL/00394/2024-2025 | 27/09/2024 | S.G. CONSTRUCTION | ORD/000475/2022-2023 | 3193/ALD | 27/02/2023 | Tube well Boring by ODEX-165 Method of drilling at HW, FIRST TUBE WELL site including laying distribution system with new HDPE pipeline , Constructions of 150 Cum OHR as per Departmental Design & drawing , TWO nos pump house & boundary wall, providing FH | 38.23 | 254/24-25/PFMS | 01/10/2024 | VCH/000324/2024-2025 |
88 | Alipurduar Division | BILL/00395/2024-2025 | 27/09/2024 | TAPASH KUMAR BHOWMICK | ORD/000210/2024-2025 | 2061/ALD | 12/07/2024 | Laying of rising main DI (K7), interconnection work with HDPE pipe , Construction of sluice valve chamber for Umacharanpur PWSS under Birpara Sub- Division ,Alipurduar Division PHE Dte. under North Bengal Circle-I PHE DTE. | 93.17 | 258/24-25/PFMS | 01/10/2024 | VCH/000327/2024-2025 |
89 | Alipurduar Division | BILL/00414/2024-2025 | 27/09/2024 | SASANKA ROY | ORD/000510/2022-2023 | 3397/ALD | 16/03/2023 | Boring of Tube Well, Construction of Pump House, Boundary Wall, OHR (150 cum) including soil testing, Laying Of Rising Main, Distribution System and providing FHTC for Pararpar PWSS Under Alipurduar Division, PHE Dte. (2nd call) | 42.04 | 253/24-25/PFMS | 01/10/2024 | VCH/000323/2024-2025 |
90 | Alipurduar Division | BILL/00419/2024-2025 | 28/09/2024 | SHREE RANISATI ENTERPRISE | ORD/000004/2022-2023 | 14/ALD | 01/04/2022 | Construction of Pump House, Boundary Wall, Tube well Boring by ODEX-165 Method of drilling including laying distribution system, Rising main and providing FHTC for MECHPARA TEA GARDEN AREA PWSS under Alipurduar Division PHE DTE | 103.71 | 270/24-25/PFMS | 03/10/2024 | VCH/000338/2024-2025 |
91 | Alipurduar Division | BILL/00420/2024-2025 | 28/09/2024 | TAPASH DAS | ORD/000011/2023-2024 | 134/ALD | 24/04/2023 | Tube well Boring by ODEX-165 Method of drilling at HW, FIRST TUBE WELL site including laying distribution system with new UPVC pipeline , Constructions of 100 Cum OHR as per Departmental Design & drawing including soil investigation works, TWO nos. pump h | 17.59 | 276/24-25/PFMS | 03/10/2024 | VCH/000345/2024-2025 |
92 | Alipurduar Division | BILL/00427/2024-2025 | 28/09/2024 | SASANKA ROY | ORD/000472/2023-2024 | 690/ALD | 07/03/2024 | Laying of DI and HDPE pipeline, trenchless pipe laying by HDD process, providing FHTC and others for Hossainabad PWSS under Alipurduar Division, PHE Dte. | 34.23 | 270/24-25/PFMS | 03/10/2024 | VCH/000339/2024-2025 |
93 | Alipurduar Division | BILL/00312/2024-2025 | 03/09/2024 | KOUSHIK BHOWMICK | ORD/000397/2023-2024 | 208/ALD | 16/01/2024 | Supply and installation of sign board for different Cha Sundori projects under Madarihat -Birpara Block under Alipurduar Division, PHE Dte. | 1.09 | 182/24-25/PFMS | 06/09/2024 | VCH/000205/2024-2025 |
94 | Alipurduar Division | BILL/00369/2024-2025 | 25/09/2024 | SUDDHYA SING LAMA | ORD/000190/2023-2024 | 1460/ALD | 14/08/2023 | Construction of boundary wall, pump house, tubewell, rising main for (Mouza- Lankapara TG, JL NO. 30, Sheet No. 8, Plot No. 1052) 117 units Cha Sundori Water Supply Scheme under Alipurduar Division PHE DTE. | 5.94 | 224/24-25/PFMS | 27/09/2024 | VCH/000283/2024-2025 |
95 | Alipurduar Division | BILL/00375/2024-2025 | 25/09/2024 | MAHENDRA CHHETRI | ORD/000490/2023-2024 | 746/ALD | 12/03/2024 | Construction of 2 no pump house, 2no boundary wall, 2 nos TW boring ODEX-165 and laying of HDPE pipeline, FTHC and platform & allied works for Chota Jaigaon under JDA PWSS under Alipurduar Division, PHE Dte. | 20.93 | 222/24-25/PFMS | 27/09/2024 | VCH/000281/2024-2025 |
96 | Alipurduar Division | BILL/00376/2024-2025 | 26/09/2024 | SOUVIK ROY PALADHI | ORD/000472/2022-2023 | 3156/ALD | 22/02/2023 | Constructions of pump house and Sinking of 250 mm x 200 mm X 150 mtr Big dia Tubewel at HW site , 2nd site and 3 rd Site Laying of distribution system with UPVC pipeline , Constructions of 200 Cum OHR as per Departmental Design and drawing , inc | 63.94 | 236/24-25/PFMS | 30/09/2024 | VCH/000294/2024-2025 |
97 | Alipurduar Division | BILL/00378/2024-2025 | 26/09/2024 | KAMALESH ROY | ORD/000391/2023-2024 | 202/ALD | 16/01/2024 | Laying of new UPVC/DI pipeline for filling of Gap in the distribution system and other allied works in connection with the complain address in the CMRO portal in the command area of Chandirjhar PWSS under Alipurduar Division, PHE Dte. | 6.87 | 232/24-25/PFMS | 30/09/2024 | VCH/000290/2024-2025 |
98 | Alipurduar Division | BILL/00386/2024-2025 | 26/09/2024 | DIPAK DAS | ORD/000462/2023-2024 | 161/ALD | 11/01/2024 | Hiring of Diesel Vehicle Maxi Cab(At least 7 seater ) for Assistant Engineer, Head Quarter, Alipurduar Division, P.H.E. Dte.(from 01.01.2024 to 31.12.2024) | 0.39 | 240/24-25/PFMS | 30/09/2024 | VCH/000297/2024-2025 |
99 | Alipurduar Division | BILL/00388/2024-2025 | 26/09/2024 | DIPAK DAS | ORD/000462/2023-2024 | 161/ALD | 11/01/2024 | Hiring of Diesel Vehicle Maxi Cab(At least 7 seater ) for Assistant Engineer, Head Quarter, Alipurduar Division, P.H.E. Dte.(from 01.01.2024 to 31.12.2024) | 0.39 | 242/24-25/PFMS | 30/09/2024 | VCH/000299/2024-2025 |
100 | Alipurduar Division | BILL/00432/2024-2025 | 30/09/2024 | DILIP MAHATO | ORD/000174/2023-2024 | 1048/ALD | 20/07/2023 | Construction of tube wells (2 nos.) by Reverse rotary method of drilling at HW site and 2nd TW site , Soil investigation at OHR site, constructions of 400 Cum OHR at HW , construction of pump house and boundary wall at H/W and 2nd site, laying of rising | 98.54 | 284/24-25/PFMS | 04/10/2024 | VCH/000352/2024-2025 |
101 | Alipurduar Division | BILL/00439/2024-2025 | 30/09/2024 | DILIP MAHATO | ORD/000438/2022-2023 | 2867/ALD | 17/01/2023 | Construction of 550cum. OHR for Birpara TG (Middle) Water Supply Scheme under Alipurduar Division, PHE Dte. | 62.69 | 297/24-25/PFMS | 05/10/2024 | VCH/000314/2024-2025 |
102 | Alipurduar Division | BILL/00452/2024-2025 | 01/10/2024 | KAMALESH ROY | ORD/000331/2022-2023 | 2240/ALD | 21/11/2022 | Tube well Boring by ODEX-165 method of drilling at 3rd TWsite including laying Distribution system with new HDPE Pipeline (Part-A), Providing FHTC and other allied works for augmentation of KAIJALI BUSTY PWSS under Alipurduar Division, PHE Dte. | 14.55 | 316/24-25/PFMS | 05/10/2024 | VCH/000377/2024-2025 |
103 | Alipurduar Division | BILL/00453/2024-2025 | 01/10/2024 | BENGAL YOUTH UN EMPLOYED ENGINEERS CO OPERATIVE SOCIETY LIMITED | ORD/000192/2023-2024 | 1468/ALD | 16/08/2023 | Gap filling of distribution line with DI/CI/UPVC pipe at Nurpur WSS under Alipurduar Division, PHE Dte. | 17.31 | 307/24-25/PFMS | 05/10/2024 | VCH/000369/2024-2025 |
104 | Alipurduar Division | BILL/00454/2024-2025 | 01/10/2024 | SAMIRON PODDER | ORD/000578/2022-2023 | 3639/ALD | 31/03/2023 | Tube well Boring by ODEX-165 Method of drilling at HW, FIRST TUBE WELL site including laying distribution system with new HDPE pipeline , Constructions of 100 Cum OHR as per Departmental Design & drawing , TWO nos. pump house & boundary wall, providing F | 49.28 | 294/24-25/PFMS | 05/10/2024 | VCH/000362/2024-2025 |
105 | Alipurduar Division | BILL/00458/2024-2025 | 01/10/2024 | SOUVIK ROY PALADHI | ORD/000140/2022-2023 | 977/ALD | 15/07/2022 | Construction of 250cum. OHR for Sankosh TG Water Supply Scheme under Alipurduar Division, PHE Dte. | 13.09 | 305/24-25/PFMS | 05/10/2024 | VCH/000367/2024-2025 |
106 | Alipurduar Division | BILL/00460/2024-2025 | 01/10/2024 | SOUVIK ROY PALADHI | ORD/000231/2021-2022 | 1570/ALD | 22/11/2021 | Laying of HDPE pipe line for the Birpara Water Supply Scheme under Alipurduar Division,PHE Dte.(Part-3) | 29.87 | 298/24-25/PFMS | 05/10/2024 | VCH/000313/2024-2025 |
107 | Alipurduar Division | BILL/00465/2024-2025 | 01/10/2024 | DULAL DAS | ORD/000324/2023-2024 | 2421/ALD | 09/11/2023 | Tube well boring by ODEX-165 Method of drilling, Construction of Pump House, Boundary wall at proposed 6th site of SAMUKTALA PWSS under Alipurduar Division, PHE Dte. | 17.48 | 302/24-25//PFMS | 05/10/2024 | VCH/000306/2024-2025 |
108 | Alipurduar Division | BILL/00466/2024-2025 | 01/10/2024 | DIPAK DAS | ORD/000340/2023-2024 | 2541/ALD | 28/11/2023 | Laying of rising main and delivery line connection, construction of boundary wall at headwork site of Samuktala Zone-I PWSS under Alipurduar Division, PHE Dte. | 10.83 | 301/24-25/PFMS | 05/10/2024 | VCH/000305/2024-2025 |
109 | Alipurduar Division | BILL/00468/2024-2025 | 01/10/2024 | SOUVIK ROY PALADHI | ORD/000431/2022-2023 | 2858/ALD | 17/01/2023 | Constructions of pump house & Sinking of 250 mm x 200 mm X 150 mtr Big dia Tubewel at HW site & 2nd site , laying of distribution system with UPVC pipeline , Constructions of 200 Cum OHR as per Departmental Design & drawing including soil test, pr | 60.22 | 310/24-25/pfms | 05/10/2024 | VCH/000372/2024-2025 |
110 | Alipurduar Division | BILL/00280/2024-2025 | 30/08/2024 | KAMALESH ROY | ORD/000195/2023-2024 | 1471/ALD | 16/08/2023 | Laying distribution system with new HDPE/DI pipeline and other allied works for providing FHTC in connection with the Shrinathpur TG PWSS under Alipurduar Division, PHE Dte. | 7.86 | 176/24-25/PFMS | 04/09/2024 | VCH/000197/2024-2025 |
111 | Alipurduar Division | BILL/00284/2024-2025 | 30/08/2024 | HARIDAS GHOSH | ORD/000557/2022-2023 | 3577/ALD | 27/03/2023 | Constructions of pump house & Sinking of 250 mm x 200 mm X 150 mtr. Big dia. Tube well at HW site & 2nd site , laying of distribution system with UPVC pipeline , Constructions of 250 Cum OHR as per Departmental Design & drawing including soil test, provid | 27.84 | 177/24-25/PFMS | 04/09/2024 | VCH/000200/2024-2025 |
112 | Alipurduar Division | BILL/00325/2024-2025 | 11/09/2024 | ANKIT SARKAR | ORD/000248/2023-2024 | 1590/ALD | 25/08/2023 | Providing balance FHTC for PASCHIM CHENGMARI PWSS under Alipurduar Division, PHE Dte. | 1.49 | 208/24-25/PFMS | 21/09/2024 | VCH/000264/2024-2025 |
113 | Alipurduar Division | BILL/00327/2024-2025 | 11/09/2024 | HIMALAYAN CO-OPERATIVE LABOUR CONTRACT & CONSTRUCTION SOCIETY LTD. | ORD/000005/2023-2024 | 26/ALD | 06/04/2023 | Laying of new UPVC/DI pipeline for replacement of 75mm dia UPVC pipe with 90mm dia pipeline, gap filling and re distribution system along with the others allied works under Jashodanga PWSS under Alipurduar Division, PHE Dte. | 20.52 | 194/24-25/PFMS | 16/09/2024 | VCH/000251/2024-2025 |
114 | Alipurduar Division | BILL/00340/2024-2025 | 18/09/2024 | DILIP MAHATO | ORD/000022/2023-2024 | 258/ALD | 08/05/2023 | Soil investigation at OHR site, constructions of 300 Cum OHR at HW , distribution line and providing FHTC as per Departmental Design & drawing for Khagenhat PWSS Under Birpara Subdivision, Alipurduar Division PHE DTE. | 38.73 | 206/24-25/PFMS | 21/09/2024 | VCH/000262/2024-2025 |
115 | Alipurduar Division | BILL/00347/2024-2025 | 21/09/2024 | M/S RADHASWAMI ENTERPRISE | ORD/000182/2023-2024 | 1171/ALD | 03/08/2023 | Constructions of 2(TWO) NOS 150 Cum OHR as per Departmental Design & drawing including laying distribution system with new HDPE pipeline, RISING MAIN, Construction of BOUNDARY WALL, 4(FOUR) NOS ODEX-165 TUBE WELL, 4(FOUR) NOS PUMP HOUSE, Soil Investigati | 89.83 | 267/24-25/PFMS | 01/10/2024 | VCH/000336/2024-2025 |
116 | Alipurduar Division | BILL/00354/2024-2025 | 21/09/2024 | EFFLUENT AND WATERTREATMENT ENGINEERS PVT LTD | ORD/000533/2023-2024 | 891/ALD | 15/03/2024 | Sinking of Big dia. Tubewell (200 x 150 mm dia.)By modified DTH -ODEX method of drilling at Dhumchipara-2nos. site (SM/09896 & SM/16824) of Birpara Sub-Division under Alipurduar Division, PHE Dte. | 23.19 | 320/24-25/PFMS | 07/10/2024 | VCH/000381/2024-2025 |
117 | Alipurduar Division | BILL/00357/2024-2025 | 24/09/2024 | MADHAB SAHA | ORD/000371/2023-2024 | 87/ALD | 10/01/2024 | Laying of rising main line with HDPE PN10, horizontal boring by HDD method , bridge and culvert crossing, construction of pathway, surface drain and chatal, installation of paver block, land development along with the other allied works at PURBA NARATHALI | 16.14 | 218/24-25/PFMS | 27/09/2024 | VCH/000278/2024-2025 |
118 | Alipurduar Division | BILL/00396/2024-2025 | 27/09/2024 | DOOARS CONSTRUCTION COMPANY | ORD/000548/2022-2023 | 3571/ALD | 27/03/2023 | Construction of 2 nos. Tube well boring by ODEX-165 Method of drilling at HW site including distribution system with new HDPE pipeline, Construction of 200 cum OHR as per Departmental Design & drawing, Pump House , Boundary Wall, Path way including soil | 49.20 | 247/24-25/PFMS | 01/10/2024 | VCH/000319/2024-2025 |
119 | Alipurduar Division | BILL/00397/2024-2025 | 27/09/2024 | M/S ELITE CONSTRUCTION | ORD/000178/2023-2024 | 1114/ALD | 28/07/2023 | Construction of tube wells (2 nos.) by Reverse rotary method of drilling at HW site and 2nd TW site , soil investigation at OHR site, constructions of 400 Cum OHR at HW , construction of pump house and boundary wall at H/W and 2nd site, laying of rising | 115.45 | 261/24-25/PFMS | 01/10/2024 | VCH/000330/2024-2025 |
120 | Alipurduar Division | BILL/00400/2024-2025 | 27/09/2024 | TAPASH KUMAR BHOWMICK | ORD/000551/2022-2023 | 3574/ALD | 27/03/2023 | Cons. of Pump House & Tube well Boring by ODEX-165 Method drilling at HW Site & 2nd Site, laying distribution system with UPVC pipeline including rising main & delivery connection, Cons. of 150cum OHR as per departmental Design & drawing along with soil | 91.82 | 256/24-25/PFMS | 01/10/2024 | VCH/000325/2024-2025 |
121 | Alipurduar Division | BILL/00411/2024-2025 | 27/09/2024 | TAPASH DAS | ORD/000222/2023-2024 | 1582/ALD | 24/08/2023 | Cons. Of Rising line, pathway, surface drain, laying of DI and UPVC pipeline and restoration of FHTC at Salkumarhat PWSS under Alipurduar Division, PHE Dte. | 11.56 | 245/24-25/PFMS | 01/10/2024 | VCH/000311/2024-2025 |
122 | Alipurduar Division | BILL/00417/2024-2025 | 27/09/2024 | DILIP MAHATO | ORD/000575/2022-2023 | 3636/ALD | 31/03/2023 | Construction of tubewells (2 nos.) by Reverse rotary method of drilling at HW site and 2nd TW site , Soil investigation at OHR site, constructions of 250 Cum OHR at HW , construction of pump house and boundary wall at H/W and 2nd site, laying of rising | 68.23 | 257/24-25/PFMS | 01/10/2024 | VCH/000326/2024-2025 |
123 | Alipurduar Division | BILL/00287/2024-2025 | 03/09/2024 | MADHAB SAHA | ORD/000527/2023-2024 | 846/ALD | 14/03/2024 | "Supply of DIDF Special and CI Jeffy Coupling for Dalgaon TG Water Supply Scheme(SM/16823) of Falakata Block under Alipurduar Division P.H.E. Dte. " | 16.41 | 186/24-25/PFMS | 07/09/2024 | VCH/000209/2024-2025 |
124 | Alipurduar Division | BILL/00377/2024-2025 | 26/09/2024 | CHINMOY BHATTACHARJEE | ORD/000457/2022-2023 | 2978/ALD | 02/02/2023 | Tube well boring by ODEX-165 Method of drilling at HW site including distribution system with new HDPE pipeline, Construction of 300 cum OHR as per Departmental Design & drawing, Providing FHTC and other allied works for RAYDAK TEA GARDEN PWSS under Alipu | 23.06 | 265/24-25/PFMS | 01/10/2024 | VCH/000334/2024-2025 |
125 | Alipurduar Division | BILL/00447/2024-2025 | 30/09/2024 | M/S SARKAR & CO | ORD/000356/2024-2025 | 3443/ALD | 27/09/2024 | Fabrication,Erection of Signage (127 nos) of Pump house/OHR site democration with in Alipurduar-I Block for Different PWSS of JJM Project Under Alipurduar Division P.H.E.Dte. | 13.73 | 319/24-25/PFMS | 07/10/2024 | VCH/000304/2024-2025 |
126 | Alipurduar Division | BILL/00462/2024-2025 | 01/10/2024 | MAHENDRA CHHETRI | ORD/000486/2021-2022 | 2910/ALD | 08/03/2022 | Construction of Internal Road, Drain, Sub-station (2X500 KW), internal road, chemical house, guard room, Laboratorys and Pressure filter at Head Work Site under Jaigaon Development Area under Alipurduar Division P.H.E. Dte. | 31.42 | 306/24-25/PFMS | 05/10/2024 | VCH/000368/2024-2025 |
127 | Alipurduar Division | BILL/00463/2024-2025 | 01/10/2024 | HARI CONSTRUCTION | ORD/000480/2023-2024 | 698/ALD | 07/03/2024 | Supply of CIPE Special & CI Jeffy Coupling for Kayakhata Water Supply Scheme under Alipurduar Division P.H.E. Dte. | 0.56 | 308/24-25/PFMS | 05/10/2024 | VCH/000370/2024-2025 |
128 | Alipurduar Division | BILL/00322/2024-2025 | 11/09/2024 | SOUVIK ROY PALADHI | ORD/000016/2023-2024 | 234/ALD | 04/05/2023 | Constructions of pump house and Tube well Boring by ODEX-165 Method of drilling at HW site and 2nd site, Laying of distribution system with HDPE/DI pipeline, providing FHTC and others allied works for Dhantali PWSS Under Alipurduar Division PHE DTE. | 23.56 | 199/24-25/PFMS | 18/09/2024 | VCH/000255/2024-2025 |
129 | Alipurduar Division | BILL/00345/2024-2025 | 21/09/2024 | EFFLUENT AND WATERTREATMENT ENGINEERS PVT LTD | ORD/000233/2024-2025 | 2293/ALD | 06/08/2024 | Supply of MSREW Pipe for modified DTH - ODEX of drilling at 2 different locations under Madarihat-Birpara Block of RWS SUB-Division under Alipurduar Division, PHE Dte.(SM/16824) | 8.09 | 213/24-25/PFMS | 25/09/2024 | VCH/000269/2024-2025 |
130 | Alipurduar Division | BILL/00356/2024-2025 | 24/09/2024 | DAS CONSTRUCTION | ORD/000477/2023-2024 | 695/ALD | 07/03/2024 | Laying of UPVC and DI distribution line, repairing and renovation of 2nos pump house for Aug. Of Banchukamari PWSS Alipurduar Division, PHE Dte. | 35.81 | 217/24-25/PFMS | 27/09/2024 | VCH/000277/2024-2025 |
131 | Alipurduar Division | BILL/00410/2024-2025 | 27/09/2024 | MITHUN DAS | ORD/000165/2023-2024 | 970/ALD | 12/07/2023 | Laying of distribution of UPVC/DI/GI pipeline including FHTC for DALIMPUR PWSS under Alipurduar Division, PHE DTE. PART-2 | 6.50 | 263/24-25/PFMS | 01/10/2024 | VCH/000332/2024-2025 |
132 | Alipurduar Division | BILL/00415/2024-2025 | 27/09/2024 | BILTU DAS | ORD/000453/2022-2023 | 2970/ALD | 31/01/2023 | Laying of HDPE and distribution pipes in different suitable locations of Sidhabari PWSS under Alipurduar Division, PHE Dte. | 61.62 | 259/24-25/PFMS | 01/10/2024 | VCH/000328/2024-2025 |
133 | Alipurduar Division | BILL/00426/2024-2025 | 28/09/2024 | TAPASH DAS | ORD/000504/2023-2024 | 822/ALD | 14/03/2024 | Cons. of pump house at 2nd site, laying of UPVC pipeline for left out household connection and rising main with CIDF pipe and specials and other allied works for Augmentation of Jateswar PWSS of Birpara Sub-Division under Alipurduar Division, PHE Dte.(SM/ | 13.50 | 268/24-25/PFMS | 03/10/2024 | VCH/000337/2024-2025 |
134 | Alipurduar Division | BILL/00358/2024-2025 | 24/09/2024 | TAPASH KUMAR BHOWMICK | ORD/000484/2023-2024 | 740/ALD | 12/03/2024 | Supply of CIDF/CIPE Pipes and Special & CI Jeffy Coupling for Brajerkuthi Water Supply Scheme under Alipurduar Division P.H.E. Dte. | 5.89 | 248/24-25/PFMS | 01/10/2024 | VCH/000320/2024-2025 |
135 | Alipurduar Division | BILL/00382/2024-2025 | 26/09/2024 | MAHENDRA CHHETRI | ORD/000491/2023-2024 | 747/ALD | 12/03/2024 | Balance portion of boundary wall and pump house and land development of HW site, 1st site and construction of culvert and platform for BEECH TG PWSS under Kalchini Block, Alipurduar Division, PHE Dte. | 28.95 | 255/24-25/PFMS | 01/10/2024 | VCH/000274/2024-2025 |
136 | Alipurduar Division | BILL/00435/2024-2025 | 30/09/2024 | DILIP MAHATO | ORD/000200/2024-2025 | 1914/ALD | 26/06/2024 | Continuation work order of the work of "Boring of TW, Cons. Of Pump House, boundary wall, OHR (300 cum) inclu. Soil investigation works, Laying of rising main, distribution system and providing FHTC for MADHYA KHAIRBARI PWSS under Alipurduar Division PHE | 26.16 | 289/24-25/PFMS | 05/10/2024 | VCH/000357/2024-2025 |
137 | Alipurduar Division | BILL/00446/2024-2025 | 30/09/2024 | M/S SARKAR & CO | ORD/000355/2024-2025 | 3442/ALD | 27/09/2024 | Fabrication,Erection of Signage (135 nos) of Pump house/OHR site democration with in Alipurduar-II and Kalchini Block for Different PWSS of JJM Project Under Alipurduar Division P.H.E.Dte. | 6.82 | 318/24-25/PFMS | 07/10/2024 | VCH/000379/2024-2025 |
138 | Alipurduar Division | BILL/00451/2024-2025 | 01/10/2024 | DILIP MAHATO (OPC) PRIVATE LIMITED | ORD/000343/2024-2025 | 3231/ALD | 10/09/2024 | Laying of DI/HDPE distribution line, land filling at HW site, trial run and allied works at Dakshin Barajhar Forest under Aipurduar Division, PHE Dte. | 7.92 | 311/24-25/PFMS | 05/10/2024 | VCH/000373/2024-2025 |
139 | Alipurduar Division | BILL/00455/2024-2025 | 01/10/2024 | MATRI ENTERPRISE | ORD/000579/2022-2023 | 3640/ALD | 31/03/2023 | Constructions of P/H and T/W Boring by ODEX-165 Method of drilling at HW and 2nd site , LDS with UPVC P/L including rising main and delivery connection, Cons. of 200 Cum OHR as per Departmental Design & drawing along with soil investigation works, provid | 59.40 | 313/24-25/PFMS | 05/10/2024 | VCH/000374/2024-2025 |
140 | Alipurduar Division | BILL/00457/2024-2025 | 01/10/2024 | MESSRS A.B.G CONSTRUCTION | ORD/000030/2023-2024 | 334/ALD | 16/05/2023 | Construction of tube wells (2 nos.) by Reverse rotary method of drilling at HW site and 2nd TW site , Soil investigation at OHR site, constructions of 350 Cum OHR at HW , construction of pump house and boundary wall at H/W and 2nd site, laying of risin | 182.66 | 296/24-25/PFMS | 05/10/2024 | VCH/000364/2024-2025 |
141 | Alipurduar Division | BILL/00464/2024-2025 | 01/10/2024 | DIPAK DAS | ORD/000197/2023-2024 | 1495/ALD | 16/08/2023 | Construction of pathway, surface drain and chatal, installation of paver block, land development along with the others allied works at Samuktala Zone-I head work site PWSS under Alipurduar Division, PHE Dte. | 5.10 | 300/24-25/PFMS | 05/10/2024 | VCH/000307/2024-2025 |
142 | Alipurduar Division | BILL/00279/2024-2025 | 30/08/2024 | SHREE RANISATI ENTERPRISE | ORD/000014/2022-2023 | 3229/ALD. | 27/02/2023 | Construction of Pump House, Boundary Wall, Tube well Boring by ODEX-165 Method of drilling at 2nd & 3rd site including laying distribution system , Rising main and providing FHTC for KALCHINI TG ZONE-I PWSS Under Alipurduar Division PHE DTE. | 33.43 | 180/24-25/PFMS | 05/09/2024 | VCH/000203/2024-2025 |
143 | Alipurduar Division | BILL/00282/2024-2025 | 30/08/2024 | EFFLUENT AND WATERTREATMENT ENGINEERS PVT LTD | ORD/000532/2023-2024 | 890/ALD | 15/03/2024 | Sinking of Big dia. Tubewell (200 x 150 mm dia.)by modified DTH -ODEX method of drilling at Gargenda-1 no site (SM/16824) of Birpara Sub-Division under Alipurduar Division, PHE Dte. | 15.62 | 175/24-25/PFMS | 04/09/2024 | VCH/000199/2024-2025 |
144 | Alipurduar Division | BILL/00338/2024-2025 | 18/09/2024 | MANI PRADHAN | ORD/000488/2023-2024 | 744/ALD | 12/03/2024 | Construction of boulder apron for Dhumchipara PWSS for protection of existing Pump house under Alipurduar Division. | 0.74 | 207/24-25/PFMS | 21/09/2024 | VCH/000263/2024-2025 |
145 | Alipurduar Division | BILL/00398/2024-2025 | 27/09/2024 | TAPASH KUMAR BHOWMICK | ORD/000021/2023-2024 | 237/ALD | 04/05/2023 | Constructions of pump house and Tube well Boring by ODEX-165 Method of drilling at HW site and 2nd site , Laying of distribution system with HDPE pipeline including rising main & delivery connection , Constructions of 100 Cum OHR as per Departmental Desig | 45.56 | 262/24-25/PFMS | 01/10/2024 | VCH/000331/2024-2025 |
146 | Alipurduar Division | BILL/00421/2024-2025 | 28/09/2024 | BHAGWATI BHUJEL | ORD/000392/2023-2024 | 203/ALD | 16/01/2024 | Gap filling by HDPE/DI pipe in Ethelbari TG under Birpara Sub-Division, Alipurduar Division, PHE Dte. | 13.28 | 272/24-25/PFMS | 03/10/2024 | VCH/000341/2024-2025 |
147 | Alipurduar Division | BILL/00423/2024-2025 | 28/09/2024 | MAHENDRA CHHETRI | ORD/000510/2023-2024 | 828/ALD | 14/03/2024 | Laying of HDPE Pipeline for left out household connection, boundary wall, pump house, OHR, Land Development, Pathway Platform for FHTC and allied works at Bhatpara PWSS under Alipurduar Division, P.H.E. Dte. (SM/14212) | 42.11 | 273/24-25/PFMS | 03/10/2024 | VCH/000342/2024-2025 |
Total | 4,706.38 |