1 |
Murshidabad Division |
BILL/01492/2024-2025 |
06/11/2024 |
MAMATA USHA ENTERPRISE |
ORD/000106/2023-2024 |
1748/MURD |
06/07/2023 |
Sinking of 02 (Two) Nos of 300mm x 200 mm dia tube well i.e. TW-I, II of 120.00 mtr. deep by direct rotary rig
method using UPVC Pipe and UPVC Deep Well Screen (RDS) filter at JITPUR (ZONE I) Water Supply Scheme
at Head Work Site, 2nd Site site at DOMKA |
20.18 |
632-MSD/24-25 |
19/03/2025 |
VCH/001637/2024-2025 |
2 |
Murshidabad Division |
BILL/01808/2024-2025 |
15/01/2025 |
EXECUTIVE ENGINEER, PWD, BERHAMPORE DIVISION-I |
null |
Memo No. 1803 |
24/12/2024 |
Surfacing with 20 mm th P.C. and S.C. and restoration for damage by PHE pipeline with GSB, WBM II and allied works of Kalitala Jajan extension upto Ruhaghat Road from 0.00 km to 10.00 km under Berhmapore Division No - I, PWD during the year 2024-25 |
81.83 |
610-MSD/2024-25 |
22/01/2025 |
VCH/001934/2024-2025 |
3 |
Murshidabad Division |
BILL/01836/2024-2025 |
29/01/2025 |
SOUMYADIP MISRA |
ORD/000788/2023-2024 |
17/KSD |
16/01/2024 |
Hiring of Maxi cab (Non- Air Condition, Bharat Stage - III on or after 01/05/2008 with Diesel / LPG/CNG Engine) in perfect good running condition of performing a very long journey and should be covered without any trouble on daily hire basis for official |
0.39 |
778-MSD/24-25 |
29/03/2025 |
VCH/001880/2024-2025 |
4 |
Murshidabad Division |
BILL/01860/2024-2025 |
30/01/2025 |
AMAL KUMAR DAS |
ORD/000169/2023-2024 |
1975/MURD |
20/07/2023 |
BISWANATHPUR PWSS under Jal Jeevan Mission of KHARGRAM Block, Kandi Sub division , Murshidabad District under Murshidabad Division, PHE. Dte. |
8.15 |
759-MSD/24-25 |
29/03/2025 |
VCH/001712/2024-2025 |
5 |
Murshidabad Division |
BILL/02173/2024-2025 |
24/03/2025 |
HASSAN CONSTRUCTION |
ORD/000244/2024-2025 |
15/JSD |
17/01/2025 |
Hiring of Maxicab (Non-Air Condition, Bharat stage-III on or after 01/05/2008 with Diesel/L.P.G/CNG Engine) in perfect good running condition of performing a very long journey and should be covered without any trouble on monthly hire basis for official us |
0.40 |
782-MSD/24-25 |
29/03/2025 |
VCH/001891/2024-2025 |
6 |
Murshidabad Division |
BILL/01567/2024-2025 |
27/11/2024 |
MADAN MOHAN SASMAL |
ORD/000215/2023-2024 |
2330/MURD |
02/08/2023 |
Ground Water based piped water supply scheme for Jaulia Part- A village, Block:- Bharatpur-II, Kandi Sub- Division in Murshidabad district under Murshidabad Division, P.H.E Dte. |
1.84 |
764-MSD/24-25 |
29/03/2025 |
VCH/001851/2024-2025 |
7 |
Murshidabad Division |
BILL/02172/2024-2025 |
24/03/2025 |
HASSAN CONSTRUCTION |
ORD/000244/2024-2025 |
15/JSD |
17/01/2025 |
Hiring of Maxicab (Non-Air Condition, Bharat stage-III on or after 01/05/2008 with Diesel/L.P.G/CNG Engine) in perfect good running condition of performing a very long journey and should be covered without any trouble on monthly hire basis for official us |
0.19 |
782-MSD/24-25 |
29/03/2025 |
VCH/001890/2024-2025 |
8 |
Murshidabad Division |
BILL/02191/2024-2025 |
26/03/2025 |
COMMUNITY POLITECHNIC SCHEME, MIT |
null |
27552-27581/MC/LABS/000007/2021 |
14/12/2022 |
CLAIM FOR REMUNERATION OF LAB PERSONNEL FOR THE MONTH OF DECEMBER 2024 TO FEBRUARY 2025 |
1.35 |
783-MSD/2024-25 |
29/03/2025 |
VCH/001919/2024-2025 |
9 |
Murshidabad Division |
BILL/01490/2024-2025 |
06/11/2024 |
M/S.TAPAS KUMAR CHAKRABORTY |
ORD/000750/2023-2024 |
119/MURD |
11/01/2024 |
Allied Work of OHR & HDPE Pipe line for Augmentation of Sagarpara Part-A Ground Water Based Piped water supply scheme to accommodate FHTC (Functional Household Tap Connection) within Jalangi Block in the District of Murshidabad under Murshidabad Divis |
67.39 |
634-MSD/24-25 |
19/03/2025 |
VCH/001681/2024-2025 |
10 |
Murshidabad Division |
BILL/01522/2024-2025 |
11/11/2024 |
VOICE CONSTRUCTION |
ORD/000164/2023-2024 |
1933/MURD |
18/07/2023 |
Augmentation of TEJSINGHAPUR PWSS under Jal Jeevan Mission of RANINAGAR - II Block, ISLAMPUR Sub division , Murshidabad District under Murshidabad Division, PHE. Dte. (PART - B) |
12.95 |
767-MSD/24-25 |
29/03/2025 |
VCH/001684/2024-2025 |
11 |
Murshidabad Division |
BILL/01835/2024-2025 |
29/01/2025 |
SOUMYADIP MISRA |
ORD/000079/2024-2025 |
92/KSD |
27/05/2024 |
Continuation Work Order for Hiring of Maxi cab (Non- Air Condition, Bharat Stage ¿ III on or after 01/05/2008 with Diesel / LPG/CNG Engine) in perfect good running condition of performing a very long journey and should be covered without any trouble on da |
0.39 |
779-MSD/24-25 |
29/03/2025 |
VCH/001887/2024-2025 |
12 |
Murshidabad Division |
BILL/01861/2024-2025 |
30/01/2025 |
MUKTI ENTERPRISE |
ORD/000259/2023-2024 |
2495/MURD |
11/08/2023 |
Ground Water based piped water supply scheme for Hazipur Part- A village, Block:- Suti-II, Jangipur Sub- Division in Murshidabad district under Murshidabad Division, P.H.E Dte. |
0.59 |
768-MSD/24-25 |
29/03/2025 |
VCH/001715/2024-2025 |
13 |
Murshidabad Division |
BILL/01918/2024-2025 |
19/02/2025 |
PARTHA PRATIM DAS |
ORD/000892/2022-2023 |
929/MURD |
31/03/2023 |
Laying Distribution System , Rising Main Connection FHTC, Construction of Pump House & Boundary Wall for Basantapur water supply scheme of Khargram Block under Murshidabad Division, PHE Dte. |
9.07 |
698-MSD/24-25 |
28/03/2025 |
VCH/001824/2024-2025 |
14 |
Murshidabad Division |
BILL/01595/2024-2025 |
09/12/2024 |
MAA CONSTRUCTION (MUJIBOR, MAJDIYA SEKHPARA) |
ORD/000838/2023-2024 |
821/MURD |
15/03/2024 |
Allied works In connection with Bypass line connection from AIRP to Distribution main at Birendranagar (Zone-I) Water Supply Scheme for the work of Augmentation of Birendranagar (Zone-I) PWSS under Murshidabad Division P.H.E Dte. |
3.16 |
765-MSD/24-25 |
29/03/2025 |
VCH/001875/2024-2025 |
15 |
Murshidabad Division |
BILL/01834/2024-2025 |
29/01/2025 |
SOUMYADIP MISRA |
ORD/000079/2024-2025 |
92/KSD |
27/05/2024 |
Continuation Work Order for Hiring of Maxi cab (Non- Air Condition, Bharat Stage ¿ III on or after 01/05/2008 with Diesel / LPG/CNG Engine) in perfect good running condition of performing a very long journey and should be covered without any trouble on da |
0.39 |
779-MSD/24-25 |
29/03/2025 |
VCH/001886/2024-2025 |
16 |
Murshidabad Division |
BILL/01924/2024-2025 |
19/02/2025 |
MAMATA USHA ENTERPRISE |
ORD/000289/2023-2024 |
2635/MURD |
23/08/2023 |
Sinking of 03 (Three) Nos of 250mm x 150 mm dia tube well i.e. TW-I, II of 120.00 mtr. deep by direct rotary rig method using UPVC Pipe and UPVC Deep Well Screen (RDS) filter at KHARJJUNA Water Supply Scheme at Head Work Site, 2nd Site site at Burwan Bloc |
14.57 |
697-MSD/24-25 |
28/03/2025 |
VCH/001823/2024-2025 |
17 |
Murshidabad Division |
BILL/01929/2024-2025 |
19/02/2025 |
M/S. GOURI ENTERPRISE |
ORD/000720/2022-2023 |
121/MURD |
13/01/2023 |
Laying Distribution System (PART-B), Construction Pump House cum Chlorine Room (5.90m x 4.1m with sanitary and Water Supply Arrangement) & Pump House (4.10m x 3.5m without sanitary and Water Supply Arrangement) for Uncoveded BATI PWSS in Kandi Block , |
7.57 |
731-MSD/24-25 |
28/03/2025 |
VCH/001691/2024-2025 |
18 |
Murshidabad Division |
BILL/02110/2024-2025 |
18/03/2025 |
KHOKAN BISWAS |
ORD/000719/2023-2024 |
3863/MURD |
15/12/2023 |
Sinking of 03 (Three) Nos of 250mm x 150 mm dia tube well i.e. TW-I, II, III of 120.00 mtr. deep by direct rotary rig method using UPVC Pipe and UPVC Deep Well Screen (RDS) filter at Lokenathpur Zone -I Water Supply Scheme at Head Work Site, 2nd Site si |
7.39 |
695-MSD/24-25 |
28/03/2025 |
VCH/001822/2024-2025 |
19 |
Murshidabad Division |
BILL/02126/2024-2025 |
18/03/2025 |
EXECUTIVE ENGINEER, PWD, BERHAMPORE DIVISION-I |
null |
210 |
05/02/2025 |
Restoration of Cement Concrete Shoulder / Earthen Shoulder of SH-11 from Chainage 40.900 km to 41.350 km of B-K-S Road of Kandi Sub Division under Berhampore Division No.- I, P.W.D. during 2024 - 2025. |
28.06 |
699-MSD/2024-25 |
28/03/2025 |
VCH/001927/2024-2025 |
20 |
Murshidabad Division |
BILL/01508/2024-2025 |
06/11/2024 |
TAPAN DAS |
ORD/000619/2023-2024 |
3394/MURD |
01/11/2023 |
Sinking of 02 (Two) Nos of 250mm x 150 mm dia tube well i.e. TW-I, II of 120.00 mtr. deep by direct rotary rig method using UPVC Pipe and UPVC Deep Well Screen (RDS) filter at GHORAMARA Water Supply Scheme at Head Work Site, 2nd Site site at Samserganj Bl |
7.23 |
766-MSD/24-25 |
29/03/2025 |
VCH/001867/2024-2025 |
21 |
Murshidabad Division |
BILL/01587/2024-2025 |
06/12/2024 |
DHPE |
ORD/000071/2024-2025 |
2022/MURD |
11/07/2024 |
Engagement of Consultant for Field Data collection, pipeline network analysis by analyzing actual household demand in pipeline sections, identification of low pressure areas with in the pipe network system and proposing probable solution of the same in 2( |
2.30 |
763-MSD/24-25 |
29/03/2025 |
VCH/001873/2024-2025 |
22 |
Murshidabad Division |
BILL/01775/2024-2025 |
06/01/2025 |
J.S. CONSTRUCTION |
ORD/000312/2023-2024 |
2676/MURD |
24/08/2023 |
Augmentation BANIAKHALI PWSS under Jal Jeevan Mission of DOMKAL Block, ISLAMPUR Subdivision , Murshidabad District under Murshidabad Division, PHE.Dte. (Part -A) |
80.93 |
633-MSD/24-25 |
19/03/2025 |
VCH/001644/2024-2025 |
23 |
Murshidabad Division |
BILL/01809/2024-2025 |
16/01/2025 |
BHARATI CHEMICAL & SCIENTIFIC WORKS |
null |
GEMC-5116877074222180 |
12/11/2023 |
Supply, installation, Commissioning followed by at least five days necessary training of Optical true double beam atomic absorption spectrophotometer (AAS) with vapour generation assembly for water testing laboratory at Arsenic affected areas of West Beng |
49.06 |
609-MSD/2024-25 |
27/01/2025 |
VCH/001933/2024-2025 |
24 |
Murshidabad Division |
BILL/01826/2024-2025 |
29/01/2025 |
SOUMYADIP MISRA |
ORD/000788/2023-2024 |
17/KSD |
16/01/2024 |
Hiring of Maxi cab (Non- Air Condition, Bharat Stage - III on or after 01/05/2008 with Diesel / LPG/CNG Engine) in perfect good running condition of performing a very long journey and should be covered without any trouble on daily hire basis for official |
0.38 |
778-MSD/24-25 |
29/03/2025 |
VCH/001881/2024-2025 |
25 |
Murshidabad Division |
BILL/01827/2024-2025 |
29/01/2025 |
SOUMYADIP MISRA |
ORD/000788/2023-2024 |
17/KSD |
16/01/2024 |
Hiring of Maxi cab (Non- Air Condition, Bharat Stage - III on or after 01/05/2008 with Diesel / LPG/CNG Engine) in perfect good running condition of performing a very long journey and should be covered without any trouble on daily hire basis for official |
0.39 |
778-MSD/24-25 |
29/03/2025 |
VCH/001882/2024-2025 |
26 |
Murshidabad Division |
BILL/02049/2024-2025 |
12/03/2025 |
GOURANGA MONDAL |
ORD/000835/2023-2024 |
768/MURD |
13/03/2024 |
Allied work for Laying Distribution System, Construction of Boundary Wall, Approach Road & Land Development of Jajan PWSS in Bhratpur-I Block , KANDI Sub-Division under Murshidabad Division ,PHE. Dte. |
15.92 |
716-MSD/2024-25 |
29/03/2025 |
VCH/001846/2024-2025 |
27 |
Murshidabad Division |
BILL/02105/2024-2025 |
13/03/2025 |
H.MONDAL CONSTRUCTION |
ORD/000161/2024-2025 |
136/KSD |
19/09/2024 |
Continuation Work Order for the work of Hiring of Maxi cab (Non- Air Condition, Bharat Stage III on or after 01/05/2008 with Diesel / LPG/CNG Engine) in perfect good running condition of performing a very long journey and should be covered without any tro |
0.40 |
724-MSD/2024-25 |
29/03/2025 |
VCH/001852/2024-2025 |
28 |
Murshidabad Division |
BILL/01995/2024-2025 |
03/03/2025 |
SUKUMAR ROY |
ORD/000575/2022-2023 |
2940/MURD |
03/11/2022 |
Laying of Rising Main Connection including Bypass Connection at KAMALAKANTAPUR Water Supply Scheme & Repair, Renovation of Over Head Reservoir & 2 nos Pump House at Kandi Sub Divisional Hospital Under
Kandi Sub-Division, Murshidabad Division,PHE Dte. |
3.12 |
696-MSD/2024-25 |
28/03/2025 |
VCH/001834/2024-2025 |
29 |
Murshidabad Division |
BILL/02071/2024-2025 |
12/03/2025 |
H.MONDAL CONSTRUCTION |
ORD/000161/2024-2025 |
136/KSD |
19/09/2024 |
Continuation Work Order for the work of Hiring of Maxi cab (Non- Air Condition, Bharat Stage III on or after 01/05/2008 with Diesel / LPG/CNG Engine) in perfect good running condition of performing a very long journey and should be covered without any tro |
0.40 |
723-MSD/2024-25 |
29/03/2025 |
VCH/001850/2024-2025 |
30 |
Murshidabad Division |
BILL/02193/2024-2025 |
26/03/2025 |
HARIPUR DR. AMBEDKAR JANASEBA MISSION |
null |
27552-27581/MC/LABS/000007/2021 |
14/12/2022 |
CLAIM FOR REMUNERATION OF LAB PERSONNEL FOR THE PERIOD 01/02/2025 TO 28/02/2025. |
0.45 |
784-MSD/2024-25 |
29/03/2025 |
VCH/001920/2024-2025 |
31 |
Murshidabad Division |
BILL/02198/2024-2025 |
27/03/2025 |
MOTI INDUSTRIES |
ORD/000045/2024-2025 |
1949/MURD |
04/07/2024 |
Overhauling of 350 Cum Capacity, 20 mtr staging height (Shaft Wall) R.C.C. Elevated Reservoir, Repairing of Pump House & Boundary Wall, Laying of Distribution System to accommodate of FHTC work at Alamsahi village, Balbalpara village, Laskarpur village(8 |
15.35 |
773-MSD/24-25 |
29/03/2025 |
VCH/001930/2024-2025 |
32 |
Murshidabad Division |
BILL/01828/2024-2025 |
29/01/2025 |
SOUMYADIP MISRA |
ORD/000788/2023-2024 |
17/KSD |
16/01/2024 |
Hiring of Maxi cab (Non- Air Condition, Bharat Stage - III on or after 01/05/2008 with Diesel / LPG/CNG Engine) in perfect good running condition of performing a very long journey and should be covered without any trouble on daily hire basis for official |
0.37 |
778-MSD/24-25 |
29/03/2025 |
VCH/001883/2024-2025 |
33 |
Murshidabad Division |
BILL/01833/2024-2025 |
29/01/2025 |
SOUMYADIP MISRA |
ORD/000079/2024-2025 |
92/KSD |
27/05/2024 |
Continuation Work Order for Hiring of Maxi cab (Non- Air Condition, Bharat Stage ¿ III on or after 01/05/2008 with Diesel / LPG/CNG Engine) in perfect good running condition of performing a very long journey and should be covered without any trouble on da |
0.39 |
779-MSD/24-25 |
29/03/2025 |
VCH/001885/2024-2025 |
34 |
Murshidabad Division |
BILL/01593/2024-2025 |
09/12/2024 |
PAL CONSTRUCTION |
ORD/000819/2023-2024 |
740/MURD |
12/03/2024 |
Providing FHTC Connection to 268 nos household, Laying of Rising Main, Laying of
Distribution System, overhauling of RCC 45 Cum OHR, Construction of Boundary Wall (For T/W-I) =100mtr, Special repair and renovation of existing 1 (One) Nos Pump House and A |
5.03 |
769-MSD/24-25 |
29/03/2025 |
VCH/001801/2024-2025 |
35 |
Murshidabad Division |
BILL/01599/2024-2025 |
09/12/2024 |
MAMATA USHA ENTERPRISE |
ORD/000272/2023-2024 |
2603/MURD |
22/08/2023 |
Sinking of 02 (Two) Nos of 250mm x 150 mm dia tube well i.e. TW-I, II of 120.00 mtr. deep by direct rotary rig method using UPVC Pipe and UPVC Deep Well Screen (RDS) filter at CHARKA Water Supply Scheme at Head Work Site, 2nd Site site at Raghunathganj ¿ |
7.32 |
631-MSD/24-25 |
19/03/2025 |
VCH/001635/2024-2025 |
36 |
Murshidabad Division |
BILL/01829/2024-2025 |
29/01/2025 |
SOUMYADIP MISRA |
ORD/000079/2024-2025 |
92/KSD |
27/05/2024 |
Continuation Work Order for Hiring of Maxi cab (Non- Air Condition, Bharat Stage ¿ III on or after 01/05/2008 with Diesel / LPG/CNG Engine) in perfect good running condition of performing a very long journey and should be covered without any trouble on da |
0.35 |
779-MSD/24-25 |
29/03/2025 |
VCH/001884/2024-2025 |
37 |
Murshidabad Division |
BILL/01972/2024-2025 |
27/02/2025 |
ABIDA CONSTRUCTION |
ORD/000249/2024-2025 |
06/BSD |
08/01/2025 |
Continuation order for Hiring of Maxi cab (Non- Air Condition, Bharat Stage - III on or after 01/05/2008 with Diesel/LPG/CNG Engine) in perfect good running condition of performing a very long journey and should be covered without any trouble on daily hir |
0.40 |
620-MSD/2024-20 |
18/03/2025 |
VCH/001610/2024-2025 |