Sl. No. | Division
Working Divisions
|
Bill Number | Bill Date
Date of Issuance of the Work Order as per PHED-MIS
|
Vendor Name
Vendor Appointed Against this Work Order as per PHED-MIS
|
System Order Number
System generated Order No. for the Work Order as per PHED-MIS
|
Memo Number
Memo no. for Work Order Provided by the Divisions as per PHED-MIS
|
Order Date
Date of Issuance of the Work Order as per PHED-MIS
|
work_name
Name of the Work as per the Issued Work Order
|
Bill Gross Amount | Voucher Number | Voucher Date | System Voucher Number |
---|---|---|---|---|---|---|---|---|---|---|---|---|
0 | 10,027.98 | |||||||||||
1 | Murshidabad Division | BILL/01265/2023-2024 | 28/02/2024 | SANDHAN ADHIKARI | ORD/000769/2022-2023 | 496/MURD | 21/02/2023 | Laying Distribution System For Augmentation of Basabari (Part-A) PWSS of Berhampore Block under Murshidabad Division ,PHE.Dte | 6.95 | 596-MSD/2023-24 | 06/03/2024 | VCH/000940/2023-2024 |
2 | Murshidabad Division | BILL/01282/2023-2024 | 05/03/2024 | NATIONAL CONSTRUCTION (PROP:NIZAMUL BISWAS) | ORD/000840/2022-2023 | 744/MURD | 16/03/2023 | Formal Work Order for Augmentation of BRINDABANPUR ZONE-II Ground water based Piped water supply scheme to accommodate FHTC (Functional Household Tap Connection) within Raninagar -II Block of Murshidabad District under Murshidabad Division, PHE.Dte. | 176.29 | 610-MSD/2023-24 | 07/03/2024 | VCH/000958/2023-2024 |
3 | Murshidabad Division | BILL/01285/2023-2024 | 05/03/2024 | J.S. CONSTRUCTION | ORD/000208/2023-2024 | 2311/MURD | 01/08/2023 | Supplying, fabrication, erection of M.S Channel for driving of M.S Channel and construction of Steel structural Bridge for carrying of water supply line over Kandar at Kamalakantapur Water Supply Scheme at Bharatpur - I Block under Murshidabad Division, P | 16.56 | 612-MSD/2023-24 | 07/03/2024 | VCH/000960/2023-2024 |
4 | Murshidabad Division | BILL/01223/2023-2024 | 13/02/2024 | GENUINE | ORD/000590/2022-2023 | 3059/MURD | 17/11/2022 | Sinking of 02 (Two) Nos of 300mm x 200 mm dia tube well 120.00 mtr. deep by direct rotary rig method using UPVC Pipe and UPVC Deep Well Screen (RDS) filter at Godhanpara Zone-III Water Supply Scheme of TW-I,II under Islampur Sub-Division, Murshidaba | 10.46 | 615-MSD/2023-24 | 07/03/2024 | VCH/000963/2023-2024 |
5 | Murshidabad Division | BILL/01236/2023-2024 | 21/02/2024 | PAROMITA DEB | ORD/000842/2022-2023 | 745/MURD | 16/03/2023 | Formal Work Order for Augmentation of Ground Water Based HAFANIA (ZONE-I) PWSS, Block- SUTI-II, District-Murshidabad, Under Murshidabad Division, P.H.Engineering Dte. | 51.83 | 574-MSD/2023-24 | 23/02/2024 | VCH/000905/2023-2024 |
6 | Murshidabad Division | BILL/01259/2023-2024 | 28/02/2024 | DHIRENDRANATH MONDAL | ORD/000142/2023-2024 | 1866/MURD | 14/07/2023 | BADDA PWSS under Jal Jeevan Mission of BURWAN Block, Kandi Sub division , Murshidabad District under Murshidabad Division, PHE.Dte. (Part A) | 194.26 | 583-MSD/2023-24 | 29/02/2024 | VCH/000914/2023-2024 |
7 | Murshidabad Division | BILL/01131/2023-2024 | 25/01/2024 | J.S. CONSTRUCTION | ORD/000601/2022-2023 | 3150/MURD | 28/11/2022 | Formal work order for Laying of Distribution system (Part-B) and Providing Functional Household Tap Connection to 665 nos household & Construction of Boundary Wall and repairing of Pump House of Katlamari Zone -I of Islampur Sub-Division under Murshidab | 21.75 | 529-MSD/2023-24 | 09/02/2024 | VCH/000858/2023-2024 |
8 | Murshidabad Division | BILL/01133/2023-2024 | 25/01/2024 | M/S.TAPAS KUMAR CHAKRABORTY | ORD/000542/2022-2023 | 2716/MURD | 26/09/2022 | Formal work order for Laying of Distribution system,Rising Main, Sub-soil Investigation and construction of OHR (300 cum) and construction of Boundary wall and repairing of Pump-House in connection wih Augmentation of Godhanpara Zone-I water supply scheme | 27.38 | 531-MSD/2023-24 | 09/02/2024 | VCH/000862/2023-2024 |
9 | Murshidabad Division | BILL/01194/2023-2024 | 05/02/2024 | MD SAJAHAN ALI | ORD/000030/2023-2024 | 1086/MURD | 20/04/2023 | Construction of 600 Cum OHR, Pump House, Boundwary Wall , Rising Main Connection, Repairing of 2 nos P.H & Existing OHR for Augmentation of GOKARNA PWSS in Kandi Block , under Murshidabad Division ,PHE.Dte. (PART-A) | 108.91 | 539-MSD/2023-24 | 09/02/2024 | VCH/000875/2023-2024 |
10 | Murshidabad Division | BILL/01195/2023-2024 | 05/02/2024 | S. DUTTA | ORD/000681/2023-2024 | 3714/MURD | 05/12/2023 | Arrear salary and arrear festival bonus for Chemist, Bacteriologist, Lab- Assistant and Sampling- Assistant of NABL Accredited/Recognized District and Sub-District Water testing Laboratories for January and February 2023under Murshidabad Division, PHE Dte | 4.14 | 582-MSD/2023-24 | 27/02/2024 | VCH/000848/2023-2024 |
11 | Murshidabad Division | BILL/01344/2023-2024 | 13/03/2024 | M/S. ROY TRADING CO. | ORD/000540/2022-2023 | 2860/MURD | 19/10/2022 | Formal Work Order for Augmentation of Saktipur Zone-I Ground water based Piped water supply scheme to accommodate FHTC (Functional Household Tap Connection) within Beldanga-II Block of Murshidabad District under Murshidabad Division, PHE.Dte. | 57.55 | 626-MSD/2023-24 | 15/03/2024 | VCH/000994/2023-2024 |
12 | Murshidabad Division | BILL/01360/2023-2024 | 14/03/2024 | RAJKUMAR MONDAL | ORD/000276/2023-2024 | 2617/MURD | 22/08/2023 | Augmentation of Ground Water Based Narsinghpur Zone-II PWS accommodate FHTC, Laying Distribution System, Laying Rising Main in Jalangi Block within Murshidabad District under Murshidabad Division, PHE Dte. PART_A | 89.34 | 640-MSD/2023-24 | 19/03/2024 | VCH/001018/2023-2024 |
13 | Murshidabad Division | BILL/01366/2023-2024 | 01/03/2024 | RAMAKRISHNA MISSION ASHRAMA (SEVAVRATA), BAIRGACHI | null | 27552-27581/MC/LABS/000007/2021-4 | 14/12/2022 | CLAIM OF REMUNERATION OF LAB PERSONNEL AND OFFICE EXPENSES FROM 01/02/2024 TO 29/02/2024 | 1.01 | 638-MSD/2023-24 | 17/03/2024 | VCH/001013/2023-2024 |
14 | Murshidabad Division | BILL/01376/2023-2024 | 15/03/2024 | M/S.TAPAS KUMAR CHAKRABORTY | ORD/000042/2023-2024 | 1140/MURD | 26/04/2023 | Laying Distribution System & Functional Household Tap Connection (FHTC) for Augmentation of GOKARNA Water Supply Scheme under Murshidabad Division, P.H.E.Dte.(PART-C) | 105.44 | 665-MSD/2023-24 | 23/03/2024 | VCH/001042/2023-2024 |
15 | Murshidabad Division | BILL/01398/2023-2024 | 17/03/2024 | MAMATA USHA ENTERPRISE | ORD/000049/2023-2024 | 1218/MURD | 03/05/2023 | Sinking of 02 (Two) Nos of 300mm x 200 mm dia tube well i.e. TW-I, II of 90.00 mtr. deep by direct rotary rig method using UPVC Pipe and UPVC Deep Well Screen (RDS) filter at Gafulia & adjoining mouzas Water Supply Scheme at Head Work Site & 2nd Site at B | 18.94 | 673-MSD/2023-24 | 20/03/2024 | VCH/000977/2023-2024 |
16 | Murshidabad Division | BILL/01413/2023-2024 | 19/03/2024 | M/S. CHOWDHURY BUILDERS | ORD/000694/2022-2023 | 147/MURD | 17/01/2023 | Formal work order for the work of ANDULIA & Adjoining Mouzas PWSS to accommodate FHTC, Construction Tube Well, OHR, Pump House Cum Chlorine Room , Laying Distribution System, Rising Main, boundary wall and service road , under Jal Swapna of Murshidabad | 122.45 | 682-MSD/2023-24 | 23/03/2024 | VCH/001047/2023-2024 |
17 | Murshidabad Division | BILL/01419/2023-2024 | 21/03/2024 | DHIRENDRANATH MONDAL | ORD/000142/2023-2024 | 1866/MURD | 14/07/2023 | BADDA PWSS under Jal Jeevan Mission of BURWAN Block, Kandi Sub division , Murshidabad District under Murshidabad Division, PHE.Dte. (Part A) | 62.62 | 690-MSD/2023-24 | 27/03/2024 | VCH/001051/2023-2024 |
18 | Murshidabad Division | BILL/01432/2023-2024 | 23/03/2024 | NAMITA ENTERPRISE | ORD/000506/2023-2024 | 3089/MURD | 03/10/2023 | Construction of 600 Cum OHR, Rising Main, Pump House cum Chlorine Room with Sanitary and Water Supply Arrangement & Boundary Wall with R.C.C. column at Head Work Site & 2nd Tube Well Site for Augmentation of BHANDARA Zone-I Ground Based Water Supply Schem | 12.93 | 696-MSD/23-24 | 27/03/2024 | VCH/001028/2023-2024 |
19 | Murshidabad Division | BILL/00033/2024-2025 | 08/04/2024 | RURAL NATIONAL CLUB | null | 27552-27581/MC/LABs/000007/2021 | 14/12/2022 | CLAIM FOR REMUNERATION OF LAB PERSONNEL FOR THE MMONTH OF MARCH 2024 | 0.45 | 36-MSD/2024-25 | 19/04/2024 | VCH/000003/2024-2025 |
20 | Murshidabad Division | BILL/00056/2024-2025 | 16/04/2024 | DEBIPROSAD DE (PROP:- SOMNATH DEY) | ORD/000730/2022-2023 | 339/MURD | 08/02/2023 | Formal work order for Laying Distribution System (PART-C), FHTC (PART-C), for Uncovered of AMJUA PWSS at AMJUA ( Village Code-315107) , CHURIGRAM ( Village Code-315108) , DURGARAMPUR ( Village Code-315109) in Khargram Block , Kandi Sub-Division under Murs | 28.81 | 39-MSD/2024-202 | 19/04/2024 | VCH/000007/2024-2025 |
21 | Murshidabad Division | BILL/00785/2023-2024 | 10/10/2023 | MAMATA USHA ENTERPRISE | ORD/000813/2022-2023 | 671/MURD | 09/03/2023 | Formal work order for Augmentation of JALANGI ZONE-III Ground water based Piped water supply scheme to accommodate FHTC (Functional Household Tap Connection) within Jalangi Block of Murshidabad District under Murshidabad Division, PHE.Dte. | 65.55 | 536-MSD/2023-24 | 09/02/2024 | VCH/000870/2023-2024 |
22 | Murshidabad Division | BILL/01269/2023-2024 | 29/02/2024 | KALACHAND DAS | ORD/000111/2023-2024 | 1753/MURD | 06/07/2023 | Sinking of 03 (Three) Nos of 300mm x 200 mm dia tube well i.e. TW-I, II, III of 120.00 mtr. deep by direct rotaryrig method using UPVC Pipe and UPVC Deep Well Screen (RDS) filter at Kasiadanga Zone- I Water Supply Scheme at Head Work Site, 2nd Site,3 r d | 17.37 | 598-MSD/2023-24 | 06/03/2024 | VCH/000942/2023-2024 |
23 | Murshidabad Division | BILL/01320/2023-2024 | 12/03/2024 | MOLLA ENTERPRISE | ORD/000787/2022-2023 | 541/MURD | 24/02/2023 | Providing FHTC Connection to 650 nos household , Repairing & Vertical Extention of Boundary Wall ,Construction of 1 (one) no Toilet Block with sanitary and Water Supply Arrangement & Pump House repairing & Overhauling of R.C.C. elevated reservoir 250 | 14.23 | 621-MSD/2023-24 | 15/03/2024 | VCH/000986/2023-2024 |
24 | Murshidabad Division | BILL/01321/2023-2024 | 12/03/2024 | DILIP KUMAR MONDAL | ORD/000863/2022-2023 | 823/MURD | 23/03/2023 | BIPRA SEKHAR PWSS to accommodate FHTC under Jal Jeevan Mission of Murshidabad District under Burwan Block , Kandi Sub-Division, of Murshidabad Division ,PHE.Dte. | 224.68 | 618-MSD/2023-24 | 15/03/2024 | VCH/000982/2023-2024 |
25 | Murshidabad Division | BILL/01201/2023-2024 | 06/02/2024 | MOBIDUR RAHAMAN | ORD/000184/2022-2023 | 191/BSD | 28/04/2022 | Laying distribution pipeline in connection with Jal Swapna (Jal Jeevan Mission) of Nialispara ( village code: 315317 ) and Budhorpara village of Budharpara Ground Based piped water supply scheme under Berhampore Sub-Division ; Murshidabad Division, P | 4.67 | 544-MSD/2023-24 | 09/02/2024 | VCH/000879/2023-2024 |
26 | Murshidabad Division | BILL/01209/2023-2024 | 08/02/2024 | M/S.TAPAS KUMAR CHAKRABORTY | ORD/000797/2022-2023 | 602/MURD | 02/03/2023 | Formal work order for Augmentation of P.T.Rasulpur (Part - A) Piped Water Supply Scheme under Jal Jevan Mission of DOMKAL Block in the District Murshidabad District under Murshidabad Division, PHE.Dte. | 188.29 | 535-MSD/2023-24 | 16/02/2024 | VCH/000869/2023-2024 |
27 | Murshidabad Division | BILL/01252/2023-2024 | 23/02/2024 | CLIFFORD FACILITY SERVICES PVT. LTD. | ORD/000773/2022-2023 | 455/MURD | 17/02/2023 | Engagement of 07(Seven) nos. Chemist (01 no. District Laboratory and 06nos. Sub-District Laboratory) , 06(Six)nos.Bacteriologist(01 no. District Laboratory and 05nos. Sub-District Laboratory), 11(Eleven)nos. Lab Assitant(01 no. District Laboratory and 10 | 17.32 | 584-MSD/2023-24 | 29/02/2024 | VCH/000915/2023-2024 |
28 | Murshidabad Division | BILL/01182/2023-2024 | 01/02/2024 | A ONE CONSTRUCTION | ORD/000016/2023-2024 | 980/MURD | 10/04/2023 | Augmentation of KISHOREPUR(PART-A) Pipe water supply scheme, to accommodate FHTC under Jal Jeevan Mission under Jangipur Sub Division Block- SUTI-II, of Murshidabad Division,District-Murshidabad PHE.Dte. | 51.89 | 532-MSD/2023-24 | 09/02/2024 | VCH/000863/2023-2024 |
29 | Murshidabad Division | BILL/01367/2023-2024 | 01/03/2024 | COMMUNITY POLITECHNIC SCHEME, MIT | null | 27552-27581/MC/LABS/000007/2021-5 | 14/12/2022 | CALIM OF REMUNERATION OF LAB PERSONNEL FROM DECEMBER 2023 TO FEBRUARY 2024 | 1.35 | 634-MSD/2023-24 | 17/03/2024 | VCH/001007/2023-2024 |
30 | Murshidabad Division | BILL/01373/2023-2024 | 15/03/2024 | M/S GUHA & ROY ENTERPRISE | ORD/000221/2023-2024 | 2326/MURD | 02/08/2023 | Laying Distribution System, FHTC of AOCHA water supply scheme of BHARATPUR-II Block under Murshidabad Division, PHE Dte. in the District of Murshidabad Part-B | 129.61 | 642-MSD/2023-24 | 19/03/2024 | VCH/001020/2023-2024 |
31 | Murshidabad Division | BILL/01377/2023-2024 | 15/03/2024 | M/S.TAPAS KUMAR CHAKRABORTY | ORD/000229/2023-2024 | 2401/MURD | 07/08/2023 | SAHAJADPUR CT PWSS to accommodate FHTC, Pump House Cum Chlorine Room , Laying Distribution System, Rising Main, boundary wall and service road , under Jal Jeevan Mission of Raghunathganj-II Block, Murshidabad District under Jangipur Sub Division, Murs | 28.94 | 660-MSD/2023-24 | 23/03/2024 | VCH/001039/2023-2024 |
32 | Murshidabad Division | BILL/01383/2023-2024 | 16/03/2024 | RATAN DUTTA | ORD/000255/2023-2024 | 2492/MURD | 11/08/2023 | Kamalakantapur PWSS to accommodate FHTC of 1518 nos household under Jal Jeevan Mission of Bharatpur-I Block, Murshidabad District under Murshidabad Division, PHE. Dte. | 12.07 | 658-MSD/23-24 | 20/03/2024 | VCH/001003/2023-2024 |
33 | Murshidabad Division | BILL/01392/2023-2024 | 17/03/2024 | MAA CONSTRUCTION (MUJIBOR, MAJDIYA SEKHPARA) | ORD/000865/2022-2023 | 830/MURD | 23/03/2023 | Laying of Distribution System with FHTC to 752 nos household, Rising Main & OHR Repair of 90 cum capacity for Augmentation of Birendranagar (Zone-I) Pipe water supply scheme in Raghunathganj-II Block under Murshidabad Division ,PHE.Dte | 23.45 | 669-MSD/2023-24 | 23/03/2024 | VCH/001054/2023-2024 |
34 | Murshidabad Division | BILL/01408/2023-2024 | 19/03/2024 | SUGATA CHOWDHURY | ORD/000233/2023-2024 | 2343/MURD | 03/08/2023 | Ground Water based piped water supply scheme for Kharsa Part- E village, Block:- Khargram, Kandi Sub- Division in Murshidabad district under Murshidabad Division, P.H.E Dte. | 6.04 | 676-MSD/23-24 | 20/03/2024 | VCH/001021/2023-2024 |
35 | Murshidabad Division | BILL/01416/2023-2024 | 20/03/2024 | M/S. S. DAS AND ENTERPRISE | ORD/000571/2023-2024 | 3291/MURD | 19/10/2023 | Augmentation of SATITARA under Jal Jeevan Mission of BURWAN Block, Kandi Sub Division, Murshidabad District under Murshidabad Division, PHE Dte. | 142.64 | 674-MSD/23-24 | 20/03/2024 | VCH/001017/2023-2024 |
36 | Murshidabad Division | BILL/00051/2024-2025 | 16/04/2024 | MADAN MOHAN SASMAL | ORD/000215/2023-2024 | 2330/MURD | 02/08/2023 | Ground Water based piped water supply scheme for Jaulia Part- A village, Block:- Bharatpur-II, Kandi Sub- Division in Murshidabad district under Murshidabad Division, P.H.E Dte. | 9.48 | 42-MSD/2024-202 | 24/04/2024 | VCH/000006/2024-2025 |
37 | Murshidabad Division | BILL/01276/2023-2024 | 04/03/2024 | DHIRENDRANATH MONDAL | ORD/000438/2023-2024 | 2886/MURD | 12/09/2023 | Laying Distribution System of AMLAI PWSS to accommodate FHTC under Jal Jeevan Mission of Murshidabad District under Bharatpur-I Block, Kandi Sub-Division of Murshidabad Division ,PHE Dte. | 144.25 | 602-MSD/2023-24 | 06/03/2024 | VCH/000946/2023-2024 |
38 | Murshidabad Division | BILL/01287/2023-2024 | 05/03/2024 | NADIA TUBEWELLS | ORD/000128/2023-2024 | 1765/MURD | 06/07/2023 | Sinking of 03 (Three) Nos of 300mm x 200 mm dia tube well i.e. TW-I, II, III of 120.00 mtr. deep by direct rotary rig method using UPVC Pipe and UPVC Deep Well Screen (RDS) filter at Juranpur ( PART-B) Water Supply Scheme at Head Work Site, 2nd Site, 3 | 31.71 | 608-MSD/2023-24 | 07/03/2024 | VCH/000956/2023-2024 |
39 | Murshidabad Division | BILL/01290/2023-2024 | 05/03/2024 | SAMBHU NATH ROY | ORD/000267/2023-2024 | 2575/MURD | 18/08/2023 | Laying Distribution System for Augmentation of Loknathpur Zone-I (Part-A) PWSS of Beldanga-II Block under Murshidabad Division, PHE Dte. | 151.16 | 605-MSD/2023-24 | 07/03/2024 | VCH/000950/2023-2024 |
40 | Murshidabad Division | BILL/01234/2023-2024 | 21/02/2024 | PARTHA PRATIM DAS | ORD/000892/2022-2023 | 929/MURD | 31/03/2023 | Laying Distribution System , Rising Main Connection FHTC, Construction of Pump House & Boundary Wall for Basantapur water supply scheme of Khargram Block under Murshidabad Division, PHE Dte. | 19.16 | 567-MSD/2023-24 | 21/02/2024 | VCH/000898/2023-2024 |
41 | Murshidabad Division | BILL/01248/2023-2024 | 22/02/2024 | SUJIT KUMAR SAHA | ORD/000710/2022-2023 | 143/MURD | 17/01/2023 | Formal work order for the work of MAHAMMADPUR & adjoining moujas PWSS to accommodate FHTC, Construction Tube Well, OHR, Pump House Cum Chlorine Room, Laying Distribution System, Rising Main, boundary wall and service road, under Jal Jevan Mission of Mu | 57.02 | 580-MSD/2023-24 | 27/02/2024 | VCH/000910/2023-2024 |
42 | Murshidabad Division | BILL/01249/2023-2024 | 22/02/2024 | M/S JATIN | ORD/000597/2023-2024 | 3344/MURD | 28/10/2023 | Construction of 600 Cum OHR, Boundary Wall (H.W, 2nd & 3rd Site), Pump House (H.W, 2nd & 3rd Site), Land Development (H.W, 2nd & 3rd Site) and office cum godown of HIZOLE (Zone- II) & its adjoining mouzas water supply scheme of Kandi Block under Murshid | 36.61 | 581-MSD/2023-24 | 27/02/2024 | VCH/000911/2023-2024 |
43 | Murshidabad Division | BILL/01250/2023-2024 | 22/02/2024 | M/S JATIN | ORD/000596/2023-2024 | 3342/MURD | 28/10/2023 | Construction of 700 Cum OHR, Boundary Wall (H.W, 2nd & 3rd Site), Pump House (H.W, 2nd & 3rd Site), Land Development (H.W, 2nd & 3rd Site) and office cum godown of HIZOLE (Zone- I) & its adjoining mouzas water supply scheme of Kandi Block under Murshida | 33.07 | 581-MSD/2023-24 | 27/02/2024 | VCH/000913/2023-2024 |
44 | Murshidabad Division | BILL/01257/2023-2024 | 27/02/2024 | AZAD ENTERPRISE | ORD/000153/2023-2024 | 1901/MURD | 17/07/2023 | Augmentation of MURADPUR JALANGI ZONE-II PWSS Laing Distribution System, Rising Main Connection Repairing P.H, B.W, Construction of P.H of JALANGI Block , under Murshidabad Division PHE.Dte. | 6.43 | 589-MSD/2023-24 | 06/03/2024 | VCH/000934/2023-2024 |
45 | Murshidabad Division | BILL/01258/2023-2024 | 28/02/2024 | MAMATA USHA ENTERPRISE | ORD/000358/2023-2024 | 2701/MURD | 25/08/2023 | Sinking of 03 (Three) Nos of 300mm x 200 mm dia tube well i.e. TW-I, II, III of 120.00 mtr. deep by direct rotary rig method using UPVC Pipe and UPVC Deep Well Screen (RDS) filter at Shibnagar Laskarpur (Zone - II ) Water Supply Scheme at Head Work Site | 32.10 | 592-MSD/2023-24 | 06/03/2024 | VCH/000937/2023-2024 |
46 | Murshidabad Division | BILL/01128/2023-2024 | 25/01/2024 | NAYLA CONSTRUCTION | ORD/000525/2022-2023 | 2495/MURD | 30/08/2022 | Formal Work Order for Augmentation of Karimpur Jalangi Zone-II Ground Water Based Piped water supply scheme to accommodate FHTC (Functional Household Tap Connection ) under Jal Swapna in Jalangi Block of Murshidabad District under Murshidabad Division,PHE | 21.19 | 528-MSD/2023-24 | 09/02/2024 | VCH/000857/2023-2024 |
47 | Murshidabad Division | BILL/01183/2023-2024 | 01/02/2024 | SARKAR WATER SUPPLY AGENCY | ORD/000288/2023-2024 | 2634/MURD | 23/08/2023 | Sinking of 02 (Two) Nos of 250mm x 150 mm dia tube well i.e. TW-I, II of 120.00 mtr. deep by direct rotary rig method using UPVC Pipe and UPVC Deep Well Screen (RDS) filter at SUKURIA AND ADJOINING MOUJJAS Water Supply Scheme at Head Work Site, 2nd Site s | 15.44 | 527-MSD/2023-24 | 09/02/2024 | VCH/000826/2023-2024 |
48 | Murshidabad Division | BILL/01196/2023-2024 | 05/02/2024 | M/S GUNGUN CONSTRUCTION | ORD/000862/2022-2023 | 807/MURD | 22/03/2023 | Laying of Distribution System for Augmentation of KADOA (ZONE-I) Part B PWSS in SUTI-I Block under Murshidabad Division, PHE.Dte. | 34.82 | 545-MSD/2023-24 | 09/02/2024 | VCH/000880/2023-2024 |
49 | Murshidabad Division | BILL/01361/2023-2024 | 14/03/2024 | M/S BHUBAN DAS | ORD/000335/2022-2023 | 1722/MURD | 04/07/2022 | Formal Work Order for Augmentation of BHAGIRATHPUR Ground water based Piped water supply scheme to accommodate FHTC (Functional Household Tap Connection) within Domkal Block of Murshidabad District under Murshidabad Division, PHE Dte. | 33.10 | 644-MSD/2023-24 | 19/03/2024 | VCH/000979/2023-2024 |
50 | Murshidabad Division | BILL/01369/2023-2024 | 15/03/2024 | M/S UNIVERSAL TRADING | ORD/000558/2023-2024 | 3219/MURD | 13/10/2023 | Augmentation of NARASINGHAPUR ZONE-I PWSS Laying Distribution System, Rising Main Connection of JALANGI Block, under Murshidabad Division PHE. Dte. PART_A | 125.70 | 688-MSD/2023-24 | 23/03/2024 | VCH/001050/2023-2024 |
51 | Murshidabad Division | BILL/01375/2023-2024 | 15/03/2024 | ABDUL JABBAR DEWAN | ORD/000798/2022-2023 | 607/MURD | 02/03/2023 | Formal work order for GOURI NAGAR & adjoining mouzas PWSS to accommodate FHTC under Jal Jiban Mission, Block- BURWAN of Kandi Sub Division of Murshidabad District under Murshidabad Division, PHE. Dte. | 67.78 | 675-MSD/2023-24 | 23/03/2024 | VCH/001055/2023-2024 |
52 | Murshidabad Division | BILL/01384/2023-2024 | 16/03/2024 | SUMAN ENTERPRISE AND SUMAN AQUA | ORD/000805/2022-2023 | 619/MURD | 03/03/2023 | Formal work order for BHAGULIA & adjoining mouzas PWSS to accommodate FHTC under Jal Jeevan Mission, Block- BURWAN of Kandi Sub Division of Murshidabad District under Murshidabad Division, PHE.Dte. | 25.08 | 656-MSD/23-24 | 19/03/2024 | VCH/001001/2023-2024 |
53 | Murshidabad Division | BILL/01385/2023-2024 | 16/03/2024 | DHIRENDRANATH MONDAL | ORD/000729/2022-2023 | 340/MURD | 08/02/2023 | Formal work order for Construction of 350 Cum OHR,Laying Distribution System (PART-C),Rising Main Connection, FHTC , for Uncovered of SALINDA PWSS in Bharatpur-II Block , Kandi Sub-Division under Murshidabad Division ,PHE.Dte. | 48.79 | 668-MSD/23-24 | 20/03/2024 | VCH/001012/2023-2024 |
54 | Murshidabad Division | BILL/01389/2023-2024 | 16/03/2024 | MOTI RAHAMAN | ORD/000719/2022-2023 | 105/MURD | 13/01/2023 | Formal work order for the work of EKPAHARIA( Part-B) & adjoining moujas PWSS to accommodate Construction Tube Well, Pump House Cum Chlorine Room & Blower room and Laying Distribution System under Jal Jevan Mission of Murshidabad District under Murshida | 51.44 | 655-MSD/23-24 | 19/03/2024 | VCH/000999/2023-2024 |
55 | Murshidabad Division | BILL/01402/2023-2024 | 18/03/2024 | M/S.TAPAS KUMAR CHAKRABORTY | ORD/000693/2022-2023 | 165/MURD | 17/01/2023 | Formal work order for the work of PARULIA & Adjoining Mouzas PWSS to accommodate FHTC, Construction Tube Well, OHR, Pump House Cum Chlorine Room , Laying Distribution System, Rising Main, boundary wall and service road , under Jal Swapna of Murshidabad | 78.03 | 684-MSD/2023-24 | 23/03/2024 | VCH/001059/2023-2024 |
56 | Murshidabad Division | BILL/01404/2023-2024 | 18/03/2024 | M/S HANNAN KHAN CONSTRUCTION | ORD/000474/2023-2024 | 3031/MURD | 27/09/2023 | Augmentation KATAKOPRA (Zone -I) under Jal Jeevan Mission of DOMKAL Block, ISLAMPUR Subdivision , Murshidabad District under Murshidabad Division, PHE. Dte. (PART - B) | 12.44 | 670-MSD/23-24 | 20/03/2024 | VCH/001014/2023-2024 |
57 | Murshidabad Division | BILL/01418/2023-2024 | 20/03/2024 | GOUTAM MANDAL | ORD/000001/2023-2024 | 946/MURD | 05/04/2023 | Augmentation of Domkal Zone-II (Part-B) Ground water based Piped water supply scheme to accommodate FHTC (Functional Household Tap Connection) within Domkal Block of Murshidabad District under Murshidabad Division, PHE.Dte. | 57.28 | 693-MSD/23-24 | 27/03/2024 | VCH/001025/2023-2024 |
58 | Murshidabad Division | BILL/01428/2023-2024 | 22/03/2024 | IMAGIN | ORD/000774/2023-2024 | 307/MURD | 29/01/2024 | Block level orientation programme by providing logistic support by involving participants from Block, Panchayat Samity, Gram Panchayets, ASHA, VWSC, Water facilator, Lab Personnel. SHG etc engaging one resource person and hiring of chair, table, Projector | 12.42 | 699-MSD/23-24 | 27/03/2024 | VCH/001035/2023-2024 |
59 | Murshidabad Division | BILL/01260/2023-2024 | 28/02/2024 | BISWADEB CHOWDHURY, A.E ISD | null | PHE/ESTT/2133/2E-81/18 | 28/04/2022 | Remuneration of Contractual Assistant Engineer (Civil) posted at Islampur Sub-Division, PHE Dte. under Murshidabad Division, PHE dte. in the District of Murshidabad. for the Period 01/12/2023 to 31.01.2024. | 0.56 | 586-MSD/2023-24 | 06/03/2024 | VCH/000931/2023-2024 |
60 | Murshidabad Division | BILL/01278/2023-2024 | 04/03/2024 | M/S SUBHA CONSTRUCTION | ORD/000877/2022-2023 | 897/MURD | 29/03/2023 | Construction of 200 Cum OHR, Laying of Distribution System (part_A) at NODE 1 TO NODE 197, Rising Main , repairing & Overhauling of R.C.C. elevated reservoir 168 Cum capacity of staging height 20 mtr. for Augmentation work of CHANDKATI PWSS in NAWDA Blo | 18.72 | 601-MSD/2023-24 | 06/03/2024 | VCH/000945/2023-2024 |
61 | Murshidabad Division | BILL/01279/2023-2024 | 04/03/2024 | APURBA SAHA CHOWDHURY | ORD/000837/2022-2023 | 732/MURD | 15/03/2023 | Formal work order for PADAM KANDI & adjoining moujas PWSS to accommodate FHTC, Construction Tube Well, Pump House Cum Chlorine Room, Laying Distribution System, Rising Main, boundary wall and service road, under Jal Jeevan Mission of KHARGRAM Block of | 40.13 | 604-MSD/2023-24 | 07/03/2024 | VCH/000949/2023-2024 |
62 | Murshidabad Division | BILL/01288/2023-2024 | 05/03/2024 | AYUSH ENTERPRISE | ORD/000890/2022-2023 | 913/MURD | 30/03/2023 | Providing FHTC Connection to 573 nos household , Laying of Distribution System (Part_B), Repairing & Vertical Extention of Boundary Wall for Augmentation work of BACHHARA ZONE-I PWSS in Beldanga-II Block under Murshidabad Division , PHE.Dte. (part_B) | 64.32 | 607-MSD/2023-24 | 07/03/2024 | VCH/000954/2023-2024 |
63 | Murshidabad Division | BILL/01330/2023-2024 | 13/03/2024 | SARKAR WATER SUPPLY AGENCY | ORD/000285/2023-2024 | 2633/MURD | 23/08/2023 | Sinking of 03 (Three) Nos of 250mm x 150 mm dia tube well i.e. TW-I, II of 120.00 mtr. deep by direct rotary rig method using UPVC Pipe and UPVC Deep Well Screen (RDS) filter at AOCHA AND ADJOINING MOUJJAS Water Supply Scheme at Head Work Site, 2nd Site s | 7.86 | 623-MSD/2023-24 | 15/03/2024 | VCH/000989/2023-2024 |
64 | Murshidabad Division | BILL/01202/2023-2024 | 07/02/2024 | J.S. CONSTRUCTION | ORD/000273/2023-2024 | 2607/MURD | 22/08/2023 | Augmentation of BRINDABANPUR Zone-I Ground water based Piped water supply scheme to accommodate FHTC (Functional Household Tap Connection) within Raninagar -II Block of Murshidabad District under Murshidabad Division, PHE. Dte. | 56.33 | 542-MSD/2023-24 | 09/02/2024 | VCH/000849/2023-2024 |
65 | Murshidabad Division | BILL/01203/2023-2024 | 07/02/2024 | M/S. ROY TRADING CO. | ORD/000540/2022-2023 | 2860/MURD | 19/10/2022 | Formal Work Order for Augmentation of Saktipur Zone-I Ground water based Piped water supply scheme to accommodate FHTC (Functional Household Tap Connection) within Beldanga-II Block of Murshidabad District under Murshidabad Division, PHE.Dte. | 64.35 | 548-MSD/2023-24 | 09/02/2024 | VCH/000882/2023-2024 |
66 | Murshidabad Division | BILL/01210/2023-2024 | 08/02/2024 | AJAY MONDAL | ORD/000766/2022-2023 | 484/MURD | 20/02/2023 | Formal Work Order for construction of 200 Cum OHR,,Laying Distribution System (PART-A),Rising Main Connection, Boundwary Wall, for Uncovered of BATI PWSS in Kandi Block , Kandi Sub-Division under Murshidabad Division , PHE.Dte. [(i)Amount for LDS , R.Ma | 54.80 | 534-MSD/2023-24 | 16/02/2024 | VCH/000866/2023-2024 |
67 | Murshidabad Division | BILL/01218/2023-2024 | 12/02/2024 | M/S. S. DAS AND ENTERPRISE | ORD/000266/2023-2024 | 2572/MURD | 18/08/2023 | Construction of 700 Cum OHR, Boundary Wall, Rising Main Connection, Laying Distribution System PART-A,FHTC at Village- KHARGRAM (Vill. code- 315195) & Village- KANDURI (Vill. code- 315166) for Augmentation of KHARGRAM PWSS in Khargram Block , under Murs | 74.86 | 555-MSD/2023-24 | 16/02/2024 | VCH/000889/2023-2024 |
68 | Murshidabad Division | BILL/01220/2023-2024 | 12/02/2024 | M/S. BIMALENDU BOSE | ORD/000515/2020-2021 | 3051/MURD | 08/12/2020 | Formal Work Order for Retrofitting Functional Household Tap Connection (FHTC) in connection with Jal JeevanMission and Jal Swapna under command area of village Gantla under Mahalandi (Zone-II) Ground Based Water Based Water Supply Scheme for Arsenic Affe | 42.02 | 553-MSD/2023-24 | 16/02/2024 | VCH/000887/2023-2024 |
69 | Murshidabad Division | BILL/01228/2023-2024 | 16/02/2024 | FARAKKA BEEDI SHRAMIK KALYAN SAMITY | null | 27552-27581/MC/LABs/000007/2021 | 14/12/2022 | Claim for remuneration of Lab Personnel for the period 01/12/2023 to 31/01/2024 | 0.90 | 565-MSD/2023-24 | 21/02/2024 | VCH/000838/2023-2024 |
70 | Murshidabad Division | BILL/01229/2023-2024 | 16/02/2024 | RURAL NATIONAL CLUB | null | 27552-27581/MC/LABs/000007/2021 | 14/12/2022 | Claim for remuneration of Lab-Personnel for the month of January-2024 | 0.45 | 563-MSD/2023-24 | 21/02/2024 | VCH/000836/2023-2024 |
71 | Murshidabad Division | BILL/01238/2023-2024 | 21/02/2024 | BENGAL ENTERPRISE | ORD/000134/2023-2024 | 1745/MURD | 06/07/2023 | Laying of Distribution System for Augmentation of SARBANGAPUR ZONE-IB PWSS in NAWDA Block , Berhampore Sub-Division under Murshidabad Division ,PHE.Dte.(Part_C) | 49.86 | 571-MSD/2023-24 | 23/02/2024 | VCH/000902/2023-2024 |
72 | Murshidabad Division | BILL/01239/2023-2024 | 21/02/2024 | MODERN CONSTRUCTION | ORD/000342/2022-2023 | 1808/MURD | 11/07/2022 | Formal work order for Augmentation of CHANDPUR Zone-I / Part-B Ground water based Piped water supply scheme to accommodate FHTC (Functional Household Tap Connection) within Nawda Block of Murshidabad District under Murshidabad Division, PHE.Dte. | 57.38 | 579-MSD/2023-24 | 27/02/2024 | VCH/000909/2023-2024 |
73 | Murshidabad Division | BILL/01240/2023-2024 | 21/02/2024 | M/S. S. DAS AND ENTERPRISE | ORD/000808/2022-2023 | 622/MURD | 03/03/2023 | Formal work order for Augmentation of Shibnagar Laskarpur Piped Water Supply Scheme (Zone-I) Part- A under Jal Jeevan Mission of DOMKAL Block in the District Murshidabad District under Murshidabad Division, PHE Dte. | 273.02 | 569-MSD/2023-24 | 22/02/2024 | VCH/000900/2023-2024 |
74 | Murshidabad Division | BILL/01241/2023-2024 | 21/02/2024 | RAMAKRISHNA MISSION ASHRAMA (SEVAVRATA), BAIRGACHI | null | 27552-27581/MC/LABS/000007/2021 | 14/12/2022 | Claim for Remuneration of Lab Personel for the period of 01.12.2023 to 31.01.2024 | 0.90 | 576-MSD/2023-24 | 22/02/2024 | VCH/000840/2023-2024 |
75 | Murshidabad Division | BILL/01246/2023-2024 | 22/02/2024 | S.K. ENTERPRISE (SANDIP GHOSH) | ORD/000017/2023-2024 | 991/MURD | 11/04/2023 | Laying Distribution System PART-B,FHTC for Augmentation of GOBARHATI PWSS in KANDI Block , under Murshidabad Division ,PHE.Dte.Part-B | 48.78 | 577-MSD/2023-24 | 27/02/2024 | VCH/000907/2023-2024 |
76 | Murshidabad Division | BILL/01256/2023-2024 | 27/02/2024 | PRATIMA CONSTRUCTION | ORD/000872/2022-2023 | 872/MURD | 27/03/2023 | HAMIDPUR & adjoining moujas PWSS to accommodate FHTC under Jal Jivan Mission, Block- BHARATPUR-I of Kandi Sub Division of Murshidabad District under Murshidabad Division, PHE.Dte | 40.78 | 591-MSD/2023-24 | 06/03/2024 | VCH/000936/2023-2024 |
77 | Murshidabad Division | BILL/01140/2023-2024 | 25/01/2024 | BISWAS ENTERPRISE. | ORD/000802/2022-2023 | 564/MURD | 28/02/2023 | Providing FHTC to 754 nos. household, Rising Main, Repairing Vertical extension of Boundary wall and repairing of Pump House and overhauling of R.C.C. elevated reservoir 450 Cum capacity of staging height 20 mtr. (Shaft wall) for Augmentation work of Mahe | 37.44 | 588-MSD/2023-24 | 06/03/2024 | VCH/000933/2023-2024 |
78 | Murshidabad Division | BILL/01173/2023-2024 | 30/01/2024 | G MITRA & ASSOCIATES | ORD/001719/2021-2022 | 153/ISD | 17/03/2022 | Soil Investigation for determination the safe bearing capacity and other relevant parameters of soil for construction of O.H.R. for Augmentation of Ground Water Based Nabipur PWSS under Murshidabad Division, PHE Dte. | 1.48 | 568-MSD/2023-24 | 21/02/2024 | VCH/000899/2023-2024 |
79 | Murshidabad Division | BILL/01347/2023-2024 | 14/03/2024 | M/S. S. DAS AND ENTERPRISE | ORD/000358/2022-2023 | 2047/MURD | 26/07/2022 | Formal Work Order for Augmentation of KARIMPUR Jalangi Zone-I( Part A) Piped water supply scheme to accommodate FHTC (Functional Household Tap Connection ) under Jalangi Block of Murshidabad District under Murshidabad Division,PHE.Dte. | 67.43 | 632-MSD/2023-24 | 15/03/2024 | VCH/000978/2023-2024 |
80 | Murshidabad Division | BILL/01349/2023-2024 | 14/03/2024 | M/S NIRAPADA BHATTACHARJEE | ORD/000003/2023-2024 | 952/MURD | 05/04/2023 | Augmentation of SURANGAPUR Zone-I (Part -A) Ground water based Piped water supply scheme to accommodate FHTC (Functional Household Tap Connection) within Nawda Block of Murshidabad District under Murshidabad Division, PHE.Dte. | 115.23 | 651-MSD/23-24 | 19/03/2024 | VCH/000990/2023-2024 |
81 | Murshidabad Division | BILL/01357/2023-2024 | 14/03/2024 | ROY CONSTRUCTION (PROP:AVIJIT ROY) | ORD/000829/2022-2023 | 694/MURD | 10/03/2023 | Formal Work Order for LOKAIPUR PWSS to accommodate FHTC, OHR, Pump House Cum Chlorine Room, Laying Distribution System, Rising Main, boundary wall and service road, under Jal Jevan Mission, Raghunathganj-II Block of Murshidabad District under Jangipur | 48.09 | 647-MSD/2023-24 | 19/03/2024 | VCH/001033/2023-2024 |
82 | Murshidabad Division | BILL/01374/2023-2024 | 15/03/2024 | BHARATI CHEMICAL & SCIENTIFIC WORKS | ORD/000736/2023-2024 | 9/MURD | 03/01/2024 | Supply of microprocessor-based gas box for Thermo ICE 3500 AAS with VGA. Complete with gas box with processor board & burner interface assembly, cable, bracket, tube insert, flow restrictor, hook and look cable tie with mounting with required hose asse | 10.38 | 689-MSD/2023-24 | 23/03/2024 | VCH/001061/2023-2024 |
83 | Murshidabad Division | BILL/01396/2023-2024 | 17/03/2024 | M/S.TAPAS KUMAR CHAKRABORTY | ORD/000748/2022-2023 | 414/MURD | 15/02/2023 | Formal work order for Construction of 400 Cum OHR, Pump House at Head Work Site & 2nd Tube well site , Laying Distribution System (PART-A), Rising Main, FHTC (PART-A), for Uncovered of AMJUA PWSS at RAHIGRAM Village in Khargram Block, Kandi Sub-Divisio | 68.67 | 663-MSD/2023-24 | 23/03/2024 | VCH/001053/2023-2024 |
84 | Murshidabad Division | BILL/01397/2023-2024 | 17/03/2024 | M/S.TAPAS KUMAR CHAKRABORTY | ORD/000692/2022-2023 | 164/MURD | 17/01/2023 | Formal work order for the work of PUNIA & adjoining moujas PWSS to accommodate FHTC, Construction Tube Well, OHR, Pump House Cum Chlorine Room, Laying Distribution System, Rising Main, boundary wall and service road, under Jal Jevan Mission of Murshid | 64.07 | 664-MSD/2023-24 | 23/03/2024 | VCH/001041/2023-2024 |
85 | Murshidabad Division | BILL/01401/2023-2024 | 17/03/2024 | M/S.TAPAS KUMAR CHAKRABORTY | ORD/000796/2022-2023 | 603/MURD | 02/03/2023 | Formal work order for Augmentation of JITPUR (Zone-II) Ground water based Piped water supply scheme to accommodate FHTC (Functional Household Tap Connection) within Domkal Block of Murshidabad District under Murshidabad Division, PHE. Dte. | 17.22 | 659-MSD/2023-24 | 23/03/2024 | VCH/001038/2023-2024 |
86 | Murshidabad Division | BILL/01412/2023-2024 | 19/03/2024 | ASTRA | ORD/000498/2023-2024 | 3053/MURD | 29/09/2023 | BAHAGALPUR PWSS to accommodate FHTC, OHR, Pump House Cum Chlorine Room, Laying Distribution System, Rising Main, boundary wall and service road, under Jal Jeevan Mission, Block- Suti-II of Jangipur Sub-Division, Murshidabad District under Murshidabad D | 126.71 | 677-MSD/2023-24 | 23/03/2024 | VCH/001044/2023-2024 |
87 | Murshidabad Division | BILL/01420/2023-2024 | 21/03/2024 | M.I CONSTRUCTION | ORD/000530/2023-2024 | 3117/MURD | 05/10/2023 | Construction of balance portion office cum godown including sanitary and plumbing work at H.W. Site and laying of UPVC pipeline in between node point 77 to 78, 78 to 89 & 78 to 79 of Pachhipara Water Supply Scheme under Kandi Sub Division, P.H.E.Dte. in t | 13.58 | 03-MSD/2024-25 | 08/04/2024 | VCH/001193/2023-2024 |
88 | Murshidabad Division | BILL/01423/2023-2024 | 22/03/2024 | BISWAS CONSTRUCTION (GOLAM MURTAJA, BABLABONA AAIFB7956Q) | ORD/000020/2023-2024 | 993/MURD | 11/04/2023 | Laying Distribution System Part-A, Rising Main, Construction of 200 Cum OHR, Boundwary Wall, Pump House, for Kapasdanga water supply scheme of Burwan Block under Murshidabad Division, PHE Dte. PART_A | 77.45 | 691-MSD/23-24 | 27/03/2024 | VCH/001023/2023-2024 |
89 | Murshidabad Division | BILL/00019/2024-2025 | 04/04/2024 | M H SUPPLIERS | ORD/000871/2022-2023 | 850/MURD | 24/03/2023 | Laying of Rising Main, Laying of Distribution System and Overhauling of RCC 180 Cum OHR for Augmentation of HILORA ZONE II Piped Water Supply Scheme in SUTI-I Block in Murshidabad Division, PHE.Dte. | 55.99 | 04-MSD/2024-25 | 08/04/2024 | VCH/000012/2024-2025 |
90 | Murshidabad Division | BILL/00034/2024-2025 | 08/04/2024 | FARAKKA BEEDI SHRAMIK KALYAN SAMITY | null | 27552-27581/MC/LABS/000007/2021 | 14/12/2022 | Claim for remmuneration of Lab - Personnel for the period 01/03/2024 to 31/03/2024 | 0.45 | 37-MSD/2024-25 | 19/04/2024 | VCH/000005/2024-2025 |
91 | Murshidabad Division | BILL/00035/2024-2025 | 08/04/2024 | HARIPUR DR. AMBEDKAR JANASEBA MISSION | null | 27552-27581/MC/LABs/000007/2021 | 14/12/2022 | Claim for remuneration of Lab Personnel for the period 01/03/2024 to 31/03/2024 | 0.45 | 35-MSD/2024-202 | 19/04/2024 | VCH/000004/2024-2025 |
92 | Murshidabad Division | BILL/01270/2023-2024 | 22/02/2024 | RIZZ ENTERPRISE | ORD/000724/2022-2023 | 263/MURD | 01/02/2023 | Engagement of 01 no. Computer Operator / Data Entry Operator / Customer Service Cell Manager with certificate in computer application on contractual Basis through Agency for District Water Testing Laboratory under the Office of the Executive Engineer, Mu | 0.58 | 597-MSD/2023-24 | 06/03/2024 | VCH/000941/2023-2024 |
93 | Murshidabad Division | BILL/01272/2023-2024 | 01/03/2024 | DIPAYAN DEY | ORD/000721/2023-2024 | 3874/MURD | 18/12/2023 | Demolition of damaged R.C.C. Elevated Reservoir (Capacity 2,72,400 Ltr) at Satitara Water Supply Scheme under Kandi Sub Division, P.H.E.Dte. in the district of Murshidabad. | 5.35 | 600-MSD/2023-24 | 06/03/2024 | VCH/000944/2023-2024 |
94 | Murshidabad Division | BILL/01274/2023-2024 | 01/03/2024 | M/S. MOHAN LAL JAIN | ORD/000366/2023-2024 | 2724/MURD | 29/08/2023 | Augmentation of NATIAL RAJANAGAR ZONE-I ,II,& III Ground water based Piped water supply scheme to accommodate FHTC (Functional Household Tap Connection) within Raninagar -II Block of Murshidabad District under Murshidabad Division, PHE. Dte. | 218.36 | 599-MSD/2023-24 | 06/03/2024 | VCH/000943/2023-2024 |
95 | Murshidabad Division | BILL/01281/2023-2024 | 05/03/2024 | M/S. J. A. CONSTRUCTION | ORD/000828/2022-2023 | 692/MURD | 10/03/2023 | Formal work order for Augmentation of Domkal Zone-I (Part-B) & Domkal Zone - II (Part - A) Ground water based Piped water supply scheme to accommodate FHTC (Functional Household Tap Connection) within Domkal Block of Murshidabad District under Murshidabad | 9.89 | 609-MSD/2023-24 | 12/03/2024 | VCH/000980/2023-2024 |
96 | Murshidabad Division | BILL/01286/2023-2024 | 05/03/2024 | M/S. TAPAS KUMAR CHAKRABORTY & CO. | ORD/000437/2023-2024 | 2885/MURD | 12/09/2023 | KHARJJUNA & adjoining mouzas PWSS to accommodate FHTC under Jal Jeevan Mission, Block- BURWAN of Kandi Sub Division of Murshidabad District under Murshidabad Division, PHE.Dte. | 298.17 | 613-MSD/2023-24 | 07/03/2024 | VCH/000961/2023-2024 |
97 | Murshidabad Division | BILL/01230/2023-2024 | 16/02/2024 | MAHMOOD ASSOCIATES PRIVATE LIMITED | ORD/000846/2022-2023 | 773/MURD | 17/03/2023 | Formal work order for Augmentation of Aminabad Zone-II Piped Water Supply Scheme under Jal Jevan Mission of DOMKAL Block in the District Murshidabad under Murshidabad Division, PHE.Dte. | 33.64 | 560-MSD/2023-24 | 20/02/2024 | VCH/000894/2023-2024 |
98 | Murshidabad Division | BILL/01235/2023-2024 | 21/02/2024 | DIPAYAN DEY | ORD/000025/2023-2024 | 1032/MURD | 13/04/2023 | Laying Distribution System, FHTC of SUKURIA water supply scheme of Burwan Block under Murshidabad Division, PHE Dte. in the District of Murshidabad Part-B | 77.74 | 566-MSD/2023-24 | 21/02/2024 | VCH/000897/2023-2024 |
99 | Murshidabad Division | BILL/01130/2023-2024 | 25/01/2024 | M/S. GHOSH ENTERPRISE (MANAB KR GHOSH) | ORD/000768/2020-2021 | 2557/MURD | 01/10/2020 | Retrofitting Functional Household Tap Connections (FHTC) and allied works in connection with 'Jal Swapna (JalJeevan Mission )' from existing Distribution system within the Command area of village AMGACHHI (Village Code314031) under Surface Water Based Wat | 0.24 | 590-MSD/2023-24 | 06/03/2024 | VCH/000935/2023-2024 |
100 | Murshidabad Division | BILL/01185/2023-2024 | 01/02/2024 | SUMAN ENTERPRISE AND SUMAN AQUA | ORD/000805/2022-2023 | 619/MURD | 03/03/2023 | Formal work order for BHAGULIA & adjoining mouzas PWSS to accommodate FHTC under Jal Jeevan Mission, Block- BURWAN of Kandi Sub Division of Murshidabad District under Murshidabad Division, PHE.Dte. | 31.56 | 524-MSD/2023-24 | 02/02/2024 | VCH/000852/2023-2024 |
101 | Murshidabad Division | BILL/01186/2023-2024 | 01/02/2024 | MADAN MOHAN SASMAL | ORD/000215/2023-2024 | 2330/MURD | 02/08/2023 | Ground Water based piped water supply scheme for Jaulia Part- A village, Block:- Bharatpur-II, Kandi Sub- Division in Murshidabad district under Murshidabad Division, P.H.E Dte. | 6.51 | 525-MSD/2023-24 | 08/02/2024 | VCH/000853/2023-2024 |
102 | Murshidabad Division | BILL/01107/2023-2024 | 22/01/2024 | ARINDAM MAJUMDAR | ORD/000476/2021-2022 | 196/HQ | 12/08/2021 | Meet up the cost of training of The West Bengal State Council for Vocational Training (WBSCVT) under Murshidabad Division, P.H.E. Dte. In the district of Murshidabad.Meet up the cost of training of The West Bengal State Council for Vocational Training (WB | 1.97 | 617-MSD/2023-24 | 15/03/2024 | VCH/000981/2023-2024 |
103 | Murshidabad Division | BILL/01345/2023-2024 | 13/03/2024 | BISWAS ENTERPRISE (PROP. JESMIN KHATUN) | ORD/000521/2022-2023 | 2496/MURD | 30/08/2022 | Formal Work Order for Augmentation of CHANDPUR Zone-II Ground water based Piped water supply scheme to accommodate FHTC (Functional Household Tap Connection) within Nawda Block of Murshidabad District under Murshidabad Division, PHE.Dte. | 54.59 | 629-MSD/2023-24 | 15/03/2024 | VCH/001000/2023-2024 |
104 | Murshidabad Division | BILL/01354/2023-2024 | 14/03/2024 | HARAPRASAD DAS | ORD/000698/2022-2023 | 131/MURD | 16/01/2023 | Formal work order for Laying Distribution System (PART-A) of Gunanandabati PWSS at Bharatpur-I Block, Kandi Sub-Division under Murshidabad Division ,PHE.Dte. ( Scheme ID -PH222362380S000) | 56.27 | 648-MSD/23-24 | 19/03/2024 | VCH/000985/2023-2024 |
105 | Murshidabad Division | BILL/01362/2023-2024 | 14/03/2024 | SAMRIDDHI ASSOCIATED | ORD/000026/2023-2024 | 1066/MURD | 18/04/2023 | Laying Distribution System, Rising Main, FHTC, Repairing of Boundary Wall, Pump House & Existing OHR for Augmentation of Bhalkundi Zone-II Water at Supply Scheme in Khargram Block , under Murshidabad Division , PHE.Dte. | 44.72 | 646-MSD/2023-24 | 19/03/2024 | VCH/001032/2023-2024 |
106 | Murshidabad Division | BILL/01365/2023-2024 | 01/03/2024 | RURAL NATIONAL CLUB | null | 27552-27581/MC/LABS/000007/2021-3 | 14/12/2022 | CLAIM OF REMUNERATION OF LAB PERSONNEL AND OFFICE EXPENSES FROM 01/02/2024 29/02/2024 | 0.61 | 637-MSD/2023-24 | 17/03/2024 | VCH/001010/2023-2024 |
107 | Murshidabad Division | BILL/01370/2023-2024 | 15/03/2024 | DIPAYAN DEY | ORD/000804/2022-2023 | 623/MURD | 03/03/2023 | Formal work order for DAKSHIN RAYPUR & adjoining mouzas PWSS to accommodate FHTC, Construction Tube Well, OHR, Pump House Cum Chlorine Room, Laying Distribution System, Rising Main, boundary wall and service road, under Jal Jeevan Mission of BURWAN Bl | 116.91 | 631-MSD/2023-24 | 16/03/2024 | VCH/001004/2023-2024 |
108 | Murshidabad Division | BILL/01372/2023-2024 | 15/03/2024 | M/S GUHA AND ROY | ORD/000249/2023-2024 | 2465/MURD | 09/08/2023 | Augmentation of Ground Water Based Islampur PWSS Laying Distribution System, Laying Rising Main in Raninagar - I Block within Murshidabad District under Murshidabad Division, PHE Dte. PART_A | 52.36 | 641-MSD/2023-24 | 19/03/2024 | VCH/001019/2023-2024 |
109 | Murshidabad Division | BILL/01390/2023-2024 | 16/03/2024 | MOTI RAHAMAN | ORD/000373/2022-2023 | 2087/MURD | 27/07/2022 | Formal work order for Augmentation of SURANGAPUR Zone-I / Part-B Ground water based Piped water supply scheme to accommodate FHTC (Functional Household Tap Connection) within Nawda Block of Murshidabad District under Murshidabad Division, PHE.Dte. | 46.43 | 654-MSD/23-24 | 19/03/2024 | VCH/000998/2023-2024 |
110 | Murshidabad Division | BILL/01405/2023-2024 | 18/03/2024 | SURAJIT MONDAL | ORD/000185/2022-2023 | 192/BSD | 28/04/2022 | Laying and distribution of UPVC pipeline for Functional Household Tap Connections (FHTC) in connection with Jal Swapna (Jal Jeevan Mission ) and under command area of village of FATEPUR ( Village Code _315310) under Fatepur Ground Water Based Water Sup | 4.65 | 678-MSD/2023-24 | 23/03/2024 | VCH/001056/2023-2024 |
111 | Murshidabad Division | BILL/01422/2023-2024 | 22/03/2024 | M/S. MOHAN LAL JAIN | ORD/000366/2023-2024 | 2724/MURD | 29/08/2023 | Augmentation of NATIAL RAJANAGAR ZONE-I ,II,& III Ground water based Piped water supply scheme to accommodate FHTC (Functional Household Tap Connection) within Raninagar -II Block of Murshidabad District under Murshidabad Division, PHE. Dte. | 223.77 | 692-MSD/23-24 | 27/03/2024 | VCH/001024/2023-2024 |
112 | Murshidabad Division | BILL/00067/2024-2025 | 22/04/2024 | S. ENTERPRISE (PROP: SAIRUL ISLAM) | ORD/000745/2022-2023 | 412/MURD | 15/02/2023 | Formal work order for Construction of 300 Cum OHR, Pump House at Head Work Site & 2nd Tube well site , Laying Distribution System, Rising Main, FHTC, Boundary wall of SIJGRAM PWSS in Kandi Block , Kandi Sub-Division under Murshidabad Division ,PHE.Dte. | 15.23 | 46-MSD82024-25 | 26/04/2024 | VCH/000011/2024-2025 |
113 | Murshidabad Division | BILL/01271/2023-2024 | 01/03/2024 | DALIM BISWAS ENTERPRISE | ORD/000019/2023-2024 | 992/MURD | 11/04/2023 | Construction of 300 Cum OHR, Pump House, Boundwary Wall, Rising Main Connection & Repairing work of Existing OHR, Boundwary Wall , Pump House for Augmentation of Kagram water supply scheme of Bharatpur-II Block under Murshidabad Division, PHE Dte. PART_A | 45.07 | 595-MSD/2023-24 | 11/03/2024 | VCH/000948/2023-2024 |
114 | Murshidabad Division | BILL/01289/2023-2024 | 05/03/2024 | DHIRENDRANATH MONDAL | ORD/000172/2023-2024 | 1988/MURD | 21/07/2023 | INDRANI (Part-A) & adjoining mouzas PWSS to accommodate FHTC, Construction Tube Well, OHR, Pump House Cum Chlorine Room, Rising Main, FHTC work, boundary wall and service road, under Jal Jeevan Mission of Murshidabad District under Murshidabad Divisio | 22.32 | 606-MSD/2023-24 | 07/03/2024 | VCH/000952/2023-2024 |
115 | Murshidabad Division | BILL/01319/2023-2024 | 12/03/2024 | J.S. CONSTRUCTION | ORD/000171/2023-2024 | 1987/MURD | 21/07/2023 | Indrani (Part-B) & adjoining moujas PWSS to accommodate Of T/W,LDS, Pump House Cum Chlorine Room,boundary wall and service road, under Jal Jeevan Mission of Murshidabad District under Murshidabad Division, PHE.Dte. | 130.89 | 619-MSD/2023-24 | 13/03/2024 | VCH/000983/2023-2024 |
116 | Murshidabad Division | BILL/01208/2023-2024 | 08/02/2024 | M/S UNIVERSAL TRADING | ORD/000190/2023-2024 | 1993/MURD | 21/07/2023 | Construction of 450 Cum OHR, Pump House at Head Work Site & 2nd Tube well site , Laying Distribution System (PART-A), Rising Main, for Uncovered of KUNDAL PWSS at KUNDAL (Village Code- 315846), PADMALABHBATI (Village Code- 315845) in Burwan Block , Kandi | 51.62 | 550-MSD/2023-24 | 16/02/2024 | VCH/000884/2023-2024 |
117 | Murshidabad Division | BILL/01214/2023-2024 | 09/02/2024 | DOBAY CONSTRUCTION | ORD/000292/2023-2024 | 2646/MURD | 23/08/2023 | Laying of Distribution System, Rising Main for Augmentation of SARBANGAPUR ZONE-II PWSS in NAWDA Block , Berhampore Sub-Division under Murshidabad Division , PHE.Dte.(Part_B) | 145.35 | 561-MSD/2023-24 | 20/02/2024 | VCH/000895/2023-2024 |
118 | Murshidabad Division | BILL/01217/2023-2024 | 12/02/2024 | PROSENJIT DAS | ORD/000891/2022-2023 | 914/MURD | 30/03/2023 | Providing Functional Household Tap Connections (FHTC) with laying of Pipeline for last mile connectivity in village Dakshin Sekhalipur (314102) & Paschim Khandua(314103) Village in connection with Augumentation of Dakshin Sekhhalipur Pipe Water supply | 20.92 | 552-MSD/2023-24 | 16/02/2024 | VCH/000886/2023-2024 |
119 | Murshidabad Division | BILL/01219/2023-2024 | 12/02/2024 | R.K. DRILLING SERVICES | ORD/000669/2022-2023 | 3410/MURD | 22/12/2022 | Sinking of 03 (Three) Nos of 300mm x 200 mm dia tube well 120.00 mtr. deep by direct rotary rig method using UPVC Pipe and UPVC Deep Well Screen (RDS) filter at Sagarpara Part-B Water Supply Scheme of TW-I,II,III at Head Work Site & 2nd Tube Well Site | 30.68 | 551-MSD/2023-24 | 16/02/2024 | VCH/000885/2023-2024 |
120 | Murshidabad Division | BILL/01242/2023-2024 | 21/02/2024 | ARPAN PANDIT | ORD/000820/2022-2023 | 621/MURD | 03/03/2023 | Formal work order for the work of ADWAITA NAGAR PWSS to accommodate FHTC, OHR, Pump House Cum Chlorine Room , Laying Distribution System, Rising Main, boundary wall and service road , under Jal Jiban Mission of Samserganj Block, Murshidabad District | 79.54 | 573-MSD/2023-24 | 23/02/2024 | VCH/000904/2023-2024 |
121 | Murshidabad Division | BILL/01245/2023-2024 | 22/02/2024 | PAL CONSTRUCTION | ORD/000144/2023-2024 | 1868/MURD | 14/07/2023 | Augmentation Work of Harua Part A Piped Water Supply Scheme to accommodate with Laying of Rising Main , Construction of Switch Room, Boundary Wall under Jal Jeevan Mission of Jangipur Sub Division in the District Murshidabad District under Murshidabad | 14.75 | 578-MSD/2023-24 | 27/02/2024 | VCH/000908/2023-2024 |
122 | Murshidabad Division | BILL/01187/2023-2024 | 01/02/2024 | M/S BHUBAN DAS | ORD/000174/2023-2024 | 1992/MURD | 21/07/2023 | GAYSABAD (Part-B) & adjoining mouzas PWSS to accommodate Of T/W,LDS, Pump House Cum Chlorine Room, boundary wall and service road, under Jal Jeevan Mission of Murshidabad District under Murshidabad Division, PHE. Dte. | 88.15 | 530-MSD/2023-24 | 09/02/2024 | VCH/000860/2023-2024 |
123 | Murshidabad Division | BILL/01351/2023-2024 | 14/03/2024 | BISWAS CONSTRUCTION (GOLAM MURTAJA, BABLABONA AAIFB7956Q) | ORD/000800/2022-2023 | 608/MURD | 02/03/2023 | Formal work order for Augmentation of P T Rasulpur (Part - B) Piped Water Supply Scheme under Jal Jevan Mission of DOMKAL Block in the District Murshidabad District under Murshidabad Division, PHE.Dte. | 46.63 | 639-MSD/2023-24 | 19/03/2024 | VCH/001015/2023-2024 |
124 | Murshidabad Division | BILL/01353/2023-2024 | 14/03/2024 | S.K. ENTERPRISE (SANDIP GHOSH) | ORD/000017/2023-2024 | 991/MURD | 11/04/2023 | Laying Distribution System PART-B,FHTC for Augmentation of GOBARHATI PWSS in KANDI Block , under Murshidabad Division ,PHE.Dte.Part-B | 25.78 | 649-MSD/2023-24 | 19/03/2024 | VCH/001037/2023-2024 |
125 | Murshidabad Division | BILL/01364/2023-2024 | 01/03/2024 | HARIPUR DR. AMBEDKAR JANASEBA MISSION | null | 27552-27581/MC/LABS/000007/2021-2 | 14/12/2022 | CLAIM OF REMUNERATION OF LAB PERSONNEL AND OFFICE EXPENSES FROM 01/02/2024 29/02/2024 | 0.61 | 635-MSD/2023-24 | 17/03/2024 | VCH/001009/2023-2024 |
126 | Murshidabad Division | BILL/01378/2023-2024 | 15/03/2024 | M/S.TAPAS KUMAR CHAKRABORTY | ORD/000750/2023-2024 | 119/MURD | 11/01/2024 | Allied Work of OHR & HDPE Pipe line for Augmentation of Sagarpara Part-A Ground Water Based Piped water supply scheme to accommodate FHTC (Functional Household Tap Connection) within Jalangi Block in the District of Murshidabad under Murshidabad Divis | 53.60 | 661-MSD/2023-24 | 23/03/2024 | VCH/001040/2023-2024 |
127 | Murshidabad Division | BILL/01380/2023-2024 | 15/03/2024 | IMRAN CONSTRUCTION | ORD/000814/2022-2023 | 672/MURD | 09/03/2023 | Formal work order for Augmentation of PANCHTHUPI ZONE-II PWSS to accommodate FHTC , under Jal Jeevan Mission, Block- BURWAN of Kandi Sub-Division, Murshidabad District under Murshidabad Division, PHE.Dte. | 91.54 | 653-MSD/23-24 | 19/03/2024 | VCH/000995/2023-2024 |
128 | Murshidabad Division | BILL/01381/2023-2024 | 15/03/2024 | M/S TRADE ASSOCIATE | ORD/000750/2022-2023 | 413/MURD | 15/02/2023 | Formal Work Order for construction of 250 Cum OHR, Pump House at Head Work Site & 2nd Tube well site , Laying Distribution System, Rising Main, FHTC, Boundary wall of BUNDAI PWSS in Kandi Block , Kandi Sub-Division under Murshidabad Division ,PHE.Dte. | 39.33 | 672-MSD/23-24 | 20/03/2024 | VCH/001016/2023-2024 |
129 | Murshidabad Division | BILL/01403/2023-2024 | 18/03/2024 | AJOY GHOSH | ORD/000876/2022-2023 | 898/MURD | 29/03/2023 | Providing FHTC Connection to 390 nos household , Laying of Distribution System, Rising Main , Construction of Pump House & Boundary Wall, repairing & Overhauling of R.C.C. elevated reservoir 250 Cum capacity of staging height 20 mtr, Special repair and | 46.59 | 679-MSD/2023-24 | 23/03/2024 | VCH/001057/2023-2024 |
130 | Murshidabad Division | BILL/01410/2023-2024 | 19/03/2024 | M/S. S. DAS AND ENTERPRISE | ORD/000268/2023-2024 | 2573/MURD | 18/08/2023 | Laying Distribution System PART-B and FHTC at Vill-KHARGRAM (Village Code-315195) & Vill-DURGAPUR (Village Code-315167) for Augmentation of KHARGRAM PWSS in Khargram Block, under Murshidabad Division ,PHE. Dte Part-B | 90.02 | 666-MSD/23-24 | 19/03/2024 | VCH/001005/2023-2024 |
131 | Murshidabad Division | BILL/01431/2023-2024 | 23/03/2024 | IMAGIN | ORD/000794/2023-2024 | 517/MURD | 16/02/2024 | Wall writing on smooth, durable wall surface (preferably of Govt. premises/Boundary wall) by cleaning the surface thoroughly, removing old paints, preparing with one coat good quality exterior primer and painting the surface with best quality synthetic en | 91.13 | 700-MSD/23-24 | 28/03/2024 | VCH/001034/2023-2024 |
132 | Murshidabad Division | BILL/00015/2024-2025 | 04/04/2024 | MOTI RAHAMAN | ORD/000227/2023-2024 | 2403/MURD | 07/08/2023 | DAFAHAT CT PWSS to accommodate FHTC, Laying Distribution System, Rising Main, under Jal Jeevan Mission of Suti-II Block, Murshidabad District under Jangipur Sub Division, Murshidabad Division ,PHE. Dte | 53.88 | 01-MSD/2024-25 | 05/04/2024 | VCH/000009/2024-2025 |
133 | Murshidabad Division | BILL/00027/2024-2025 | 04/04/2024 | KISMAT ARA BEGAM | ORD/000178/2023-2024 | 1997/MURD | 21/07/2023 | Laying Distribution System (PART-C) and FHTC for KUNDAL PWSS in Burwan Block under Murshidabad Division ,PHE. Dte. | 34.08 | 02-MSD/2024-25 | 08/04/2024 | VCH/000010/2024-2025 |
134 | Murshidabad Division | BILL/00038/2024-2025 | 16/04/2024 | AQUEDUCT PLASTICS PVT LTD | ORD/000292/2018-2019 | 582/MURD | 07/03/2019 | Formal Work Order for 'Surveying, Planning, Design, Delievery, erection, construction, commissioning and completion in all respect of all CIVIL,ELECTRICAL and MECHANICAL works including all allied related and enabling works but excluding construction of O | 47.59 | 45-MSD/2024-202 | 19/04/2024 | VCH/000008/2024-2025 |
135 | Murshidabad Division | BILL/01264/2023-2024 | 28/02/2024 | J.S. CONSTRUCTION | ORD/000273/2023-2024 | 2607/MURD | 22/08/2023 | Augmentation of BRINDABANPUR Zone-I Ground water based Piped water supply scheme to accommodate FHTC (Functional Household Tap Connection) within Raninagar -II Block of Murshidabad District under Murshidabad Division, PHE. Dte. | 65.65 | 587-MSD/2023-24 | 06/03/2024 | VCH/000932/2023-2024 |
136 | Murshidabad Division | BILL/01275/2023-2024 | 01/03/2024 | CAPITAL CONSTRUCTION | ORD/000311/2023-2024 | 2671/MURD | 24/08/2023 | Augmentation of Ground Water Based Herampur Zone-II PWSS in Raninagar - I Block within Murshidabad District under Murshidabad Division, PHE Dte.PART_A | 61.77 | 622-MSD/2023-24 | 15/03/2024 | VCH/000987/2023-2024 |
137 | Murshidabad Division | BILL/01293/2023-2024 | 06/03/2024 | SUJIT KUMAR SAHA | ORD/000022/2023-2024 | 994/MURD | 11/04/2023 | Laying Distribution System, Rising Main, FHTC, Repairing of Boundary Wall, Pump House & Existing OHR for Augmentation of Bhalkundi Zone-I Water at Supply Scheme in Khargram Block , under Murshidabad Division ,PHE.Dte. | 57.84 | 614-MSD/2023-24 | 07/03/2024 | VCH/000962/2023-2024 |
138 | Murshidabad Division | BILL/01308/2023-2024 | 12/03/2024 | ULTRA CONSTRUCTION. | ORD/000079/2023-2024 | 1385/MURD | 22/05/2023 | Augmentation of BILASPUR PWSS under Jal Jivan Mission of DOMKAL Block, ISLAMPUR Sub division , Murshidabad District under Murshidabad Division, PHE. Dte. | 50.46 | 620-MSD/2023-24 | 15/03/2024 | VCH/000984/2023-2024 |
139 | Murshidabad Division | BILL/01332/2023-2024 | 13/03/2024 | MERCURY ENGINEERING COMPANY | ORD/000502/2022-2023 | 2459/MURD | 26/08/2022 | Formal work order for Water Supply arrangement for arsenic affected habitation with SOLAR Power connection by Construction/ installation of Community Purification Plant (CPP) unit including Tubewell (125 x 50 mm dia ) with Submersible pump (for Populati | 54.75 | 624-MSD/2023-24 | 15/03/2024 | VCH/000991/2023-2024 |
140 | Murshidabad Division | BILL/01333/2023-2024 | 13/03/2024 | ATIKUL SAIKH | ORD/000819/2022-2023 | 801/MURD | 22/03/2023 | Augmentation of Ground Water Based HAFANIA (ZONE-II) & KEYADANGA PWSS, Block- SUTI-II, District-Murshidabad, Under Murshidabad Division, P.H.Engineering Dte. | 67.14 | 628-MSD/2023-24 | 19/03/2024 | VCH/000997/2023-2024 |
141 | Murshidabad Division | BILL/01205/2023-2024 | 07/02/2024 | M/S. S. DAS AND ENTERPRISE | ORD/000268/2023-2024 | 2573/MURD | 18/08/2023 | Laying Distribution System PART-B and FHTC at Vill-KHARGRAM (Village Code-315195) & Vill-DURGAPUR (Village Code-315167) for Augmentation of KHARGRAM PWSS in Khargram Block, under Murshidabad Division ,PHE. Dte Part-B | 81.47 | 547-MSD/2023-24 | 09/02/2024 | VCH/000824/2023-2024 |
142 | Murshidabad Division | BILL/01207/2023-2024 | 07/02/2024 | J.S. CONSTRUCTION | ORD/000607/2022-2023 | 3151/MURD | 28/11/2022 | Formal work order for construction of 1000 M3 Capacity, 20mtr. staging height RCC Elevated Service Reservoir as per Departmental type design (Ref :- DRG.No. PC/-I/OHR/17/2012) including delivery, Inlet, Washout & Overflow pipe connection etc. all complete | 61.12 | 556-MSD/2023-24 | 16/02/2024 | VCH/000890/2023-2024 |
143 | Murshidabad Division | BILL/01222/2023-2024 | 12/02/2024 | PRASANTA SANA | ORD/000973/2022-2023 | 130./MURD | 16/01/2023 | Formal work order for the work of Laying Distribution System (PART-A) for Augmentation of BUNDAI PWSS in Kandi Block , Kandi Sub-Division under Murshidabad Division ,PHE.Dte. ( Scheme ID -PH222362420S000) | 32.42 | 558-MSD/2023-24 | 16/02/2024 | VCH/000892/2023-2024 |
144 | Murshidabad Division | BILL/01184/2023-2024 | 01/02/2024 | M/S. BIMALENDU BOSE | ORD/000356/2022-2023 | 1996/MURD | 21/07/2022 | Formal Work Order for Augmentation of Karimpur Jalangi Zone-I(Part-B) Piped water supply scheme to accommodate FHTC (Functional Household Tap Connection ) under Jal Swapna in Jalangi Block of Murshidabad District under Murshidabad Division,PHE.Dte. | 42.54 | 526-MSD/2023-24 | 09/02/2024 | VCH/000854/2023-2024 |
145 | Murshidabad Division | BILL/01190/2023-2024 | 05/02/2024 | M/S. ROY TRADING CO. | ORD/000655/2022-2023 | 3436/MURD | 23/12/2022 | Formal work order Augmentation of MOMENPUR Ground water based Piped water supply scheme to accommodate FHTC (Functional Household Tap Connection) within Jalangi Block of Murshidabad District under Murshidabad Division, PHE.Dte. | 101.44 | 562-MSD/2023-24 | 20/02/2024 | VCH/000896/2023-2024 |
146 | Murshidabad Division | BILL/01356/2023-2024 | 14/03/2024 | BHARATI CHEMICAL & SCIENTIFIC WORKS | null | GEMC-511687707422180 Dated - 12/10/2023 | 12/10/2023 | Supply, installation, commissioning followed by at least five days necessary trainning of Optical True Double - Beam Atomic Absorption Spectrophotometer (AAS) with Vapour Generation Assembly for water Testing Laboratory at arsenic affected areas of West B | 49.06 | 689-MSD/2023-24 | 23/03/2024 | VCH/001062/2023-2024 |
147 | Murshidabad Division | BILL/01358/2023-2024 | 14/03/2024 | MAMATA USHA ENTERPRISE | ORD/000761/2023-2024 | 183/MURD | 18/01/2024 | Allied work of OHR & HDPE Pipeline for Augmentation of Jalangi Zone-II Part-A ground water based PWSS to accommodate FHTC in Jalangi Block in the district of Murshidabad under Murshidabad Division P.H.E. Dte. | 46.28 | 680-MSD/2023-24 | 23/03/2024 | VCH/001045/2023-2024 |
148 | Murshidabad Division | BILL/01363/2023-2024 | 15/02/2024 | FARAKKA BEEDI SHRAMIK KALYAN SAMITY | null | 27552-27581/MC/LABS/000007/2021-1 | 14/12/2022 | CLAIM OF REMUNERATION OF LAB PERSONNEL AND OFFICE EXPENSES FROM 01/02/2024 29/02/2024 | 0.61 | 636-MSD/2023-24 | 17/03/2024 | VCH/001011/2023-2024 |
149 | Murshidabad Division | BILL/01368/2023-2024 | 14/03/2024 | PRADIP KUMAR DAS | ORD/000679/2022-2023 | 38/MURD | 04/01/2023 | Formal work order for the work of KHESAR & adjoining mouzas PWSS to accommodate FHTC, Construction Tube Well, OHR, Pump House Cum Chlorine Room, Laying Distribution System, Rising Main, boundary wall and service road, under Jal Jeevan Mission of Murshid | 104.89 | 633-MSD/2023-24 | 15/03/2024 | VCH/001006/2023-2024 |
150 | Murshidabad Division | BILL/01371/2023-2024 | 15/03/2024 | TIRUPATI CONSTRUCTION | ORD/000834/2022-2023 | 740/MURD | 16/03/2023 | Formal Work Order for Augmentation of PANCHTHUPI ZONE-III PWSS to accommodate FHTC under Jal Jeevan Mission, Block- BURWAN of Kandi Sub-Division, Murshidabad District under Murshidabad Division, PHE.Dte. | 30.75 | 643-MSD/2023-24 | 19/03/2024 | VCH/001022/2023-2024 |
151 | Murshidabad Division | BILL/01379/2023-2024 | 15/03/2024 | M/S.TAPAS KUMAR CHAKRABORTY | ORD/000797/2022-2023 | 602/MURD | 02/03/2023 | Formal work order for Augmentation of P.T.Rasulpur (Part - A) Piped Water Supply Scheme under Jal Jevan Mission of DOMKAL Block in the District Murshidabad District under Murshidabad Division, PHE.Dte. | 18.39 | 662-MSD/2023-24 | 23/03/2024 | VCH/001052/2023-2024 |
152 | Murshidabad Division | BILL/01382/2023-2024 | 16/03/2024 | MITRA CONSTRUCTION | ORD/000152/2023-2024 | 1900/MURD | 17/07/2023 | Laying Distribution System (PART-B), FHTC in GAFULIA Water at Supply Scheme in Burwan Block , under Murshidabad Division ,PHE. Dte. | 44.08 | 657-MSD/2023-24 | 20/03/2024 | VCH/000976/2023-2024 |
153 | Murshidabad Division | BILL/01391/2023-2024 | 16/03/2024 | SOFIQUL ISLAM | ORD/000099/2023-2024 | 1700/MURD | 28/06/2023 | GAYESPUR PWSS under Jal Jeevan Mission of KHARGRAM Block, Kandi Sub division , Murshidabad District under Murshidabad Division, PHE.Dte. | 86.38 | 667-MSD/23-24 | 20/03/2024 | VCH/001008/2023-2024 |
154 | Murshidabad Division | BILL/01400/2023-2024 | 17/03/2024 | MARUTI CONSTRUCTION AND CO. | ORD/000734/2022-2023 | 385/MURD | 10/02/2023 | Formal work order for Construction of Boundwary Wall, Pump House & Laying Distribution System(PART-B) Uncovered of UDAY CHANDPUR PWSS in Kandi Block , Kandi Sub-Division under Murshidabad Division ,PHE. Dte. | 40.49 | 652-MSD/23-24 | 19/03/2024 | VCH/000992/2023-2024 |
155 | Murshidabad Division | BILL/01414/2023-2024 | 19/03/2024 | M/S. GHOSH ENTERPRISE (MANAB KR GHOSH) | ORD/000353/2023-2024 | 2666/MURD | 24/08/2023 | Providing FHTC Connection to 1118 nos household ,Laying of Distribution System, Rising Main , Repairing & Vertical Extension of Boundary Wall, Special repair and renovation of existing 2 (Two) Nos Pump House and Allied Works ,for Augmentation work of J | 56.77 | 683-MSD/2023-24 | 23/03/2024 | VCH/001058/2023-2024 |
156 | Murshidabad Division | BILL/01429/2023-2024 | 22/03/2024 | S.S.INFRASTRUCTURE | ORD/000740/2023-2024 | 65/MURD | 08/01/2024 | Balance Work for Laying of Distribution System for Augmentation of Karimpur-Jalangi Zone-I Part-A Piped water supply scheme to accommodate FHTC (Functional House Hold Tap Connection ) under Jalangi Block of Murshidabad District under Murshidabad Divi | 114.58 | 698-MSD/23-24 | 27/03/2024 | VCH/001030/2023-2024 |
157 | Murshidabad Division | BILL/00029/2024-2025 | 04/04/2024 | M/S D. PALIT & CO. | ORD/000660/2022-2023 | 3405/MURD | 22/12/2022 | Sinking of 02(Two) Nos 250mm x 150 mm dia tube well 100.00 mtr. deep by direct rotary rig method using UPVC Pipe and UPVC Deep Well Screen (RDS) filter at SIJGRAM PWSS at Head Work Site & 2nd Tube Well Site in Kandi Block under Kandi Sub-Division, Mursh | 15.42 | 09-MSD/2024-202 | 15/04/2024 | VCH/000001/2024-2025 |
158 | Murshidabad Division | BILL/00044/2024-2025 | 16/04/2024 | M/S RUBIET HOSSAIN | ORD/000884/2022-2023 | 901/MURD | 29/03/2023 | Laying of Distribution System, Repairing & Vertical Extention of Boundary Wall, Special repair and renovation of existing 1 (One) Nos Pump House and Alied Works for Augmentation work of GHORAMARA PWSS in NAWDA Block under Murshidabad Division , PHE.Dte. ( | 4.85 | 27-MSD/2024-25 | 18/04/2024 | VCH/000002/2024-2025 |
159 | Murshidabad Division | BILL/01262/2023-2024 | 28/02/2024 | MURSHID ALOM | ORD/001762/2021-2022 | 128/JSD | 22/03/2022 | Functional Household Tap Connections (FHTC) in connection with Jal Swapna (Jal Jeevan Mission) and under command area of village of Jhamra (Village Code-314121) under Kasiadanga Ground Water Based water supply scheme for Arsenic Affected Areas of Raghunat | 3.83 | 585-MSD/2023-24 | 06/03/2024 | VCH/000930/2023-2024 |
160 | Murshidabad Division | BILL/01273/2023-2024 | 01/03/2024 | KAMIRUL SK AND CO. (PART: KAMIRUL SK. & OTHERS) | ORD/000690/2022-2023 | 144/MURD | 17/01/2023 | Formal work order for the work of GARULIA & adjoining moujas PWSS to accommodate FHTC, Construction Tube Well, OHR, Pump House Cum Chlorine Room, Laying Distribution System, Rising Main, boundary wall and service road, under Jal Jevan Mission of Murshi | 138.72 | 594-MSD/2023-24 | 06/03/2024 | VCH/000939/2023-2024 |
161 | Murshidabad Division | BILL/01283/2023-2024 | 05/03/2024 | MD SAJAHAN ALI | ORD/000737/2023-2024 | 61/MURD | 08/01/2024 | Demolition of damaged R.C.C. Elevated Reservoir (Capacity 2,72,400 Ltr) at Gokarna /Gobarhati Water Supply Scheme under Kandi Sub Division, P.H.E. Dte. in the district of Murshidabad | 5.47 | 627-MSD/2023-24 | 19/03/2024 | VCH/000996/2023-2024 |
162 | Murshidabad Division | BILL/01292/2023-2024 | 06/03/2024 | SOM CONSTRUCTION AGENCY | ORD/000701/2022-2023 | 160/MURD | 16/01/2023 | Formal Work Order For Laying of Distribution System (Part-B) and Construction of Pump House for Augmentation of SALINDA PWSS of Kandi Sub-Division under Murshidabad Division, P.H.E.Dte. in the district of Murshidabad | 20.04 | 616-MSD/2023-24 | 07/03/2024 | VCH/000964/2023-2024 |
163 | Murshidabad Division | BILL/01206/2023-2024 | 07/02/2024 | SAMAR MUKHERJEE | ORD/000866/2022-2023 | 829/MURD | 23/03/2023 | Providing FHTC Connection to 923 no household and Overhauling of RCC 450 Cum OHR for Augmentation of KADOA (ZONE-I) Part B Piped Water Supply Scheme in SUTI-I Block under Murshidabad Division, PHE.Dte. | 8.83 | 546-MSD/2023-24 | 09/02/2024 | VCH/000881/2023-2024 |
164 | Murshidabad Division | BILL/01221/2023-2024 | 12/02/2024 | M/S.TAPAS KUMAR CHAKRABORTY | ORD/000796/2022-2023 | 603/MURD | 02/03/2023 | Formal work order for Augmentation of JITPUR (Zone-II) Ground water based Piped water supply scheme to accommodate FHTC (Functional Household Tap Connection) within Domkal Block of Murshidabad District under Murshidabad Division, PHE. Dte. | 147.70 | 554-MSD/2023-24 | 16/02/2024 | VCH/000888/2023-2024 |
165 | Murshidabad Division | BILL/01227/2023-2024 | 16/02/2024 | HARIPUR DR. AMBEDKAR JANASEBA MISSION | null | 27552-27581/MC/LABs/000007/2021 | 14/12/2022 | Claim for remuneration of Lab personnel for the period of 01/01/2024 to 31/01/2024. | 0.45 | 564-MSD/2023-24 | 21/02/2024 | VCH/000837/2023-2024 |
166 | Murshidabad Division | BILL/01237/2023-2024 | 21/02/2024 | MAMATA USHA ENTERPRISE | ORD/000717/2022-2023 | 79/MURD | 10/01/2023 | Formal work order for the work of PETARI & Adjoining Mouzas PWSS to accommodate FHTC, Construction Tube Well, OHR, Pump House Cum Chlorine Room , Laying Distribution System, Rising Main, boundary wall and service road , under Jal Swapna of Murshidabad | 160.92 | 570-MSD/2023-24 | 23/02/2024 | VCH/000901/2023-2024 |
167 | Murshidabad Division | BILL/01243/2023-2024 | 21/02/2024 | SOFIQUL ISLAM | ORD/000850/2022-2023 | 780/MURD | 20/03/2023 | Formal work order for KALGRAM & adjoining moujas PWSS to accommodate FHTC, Construction Tube Well, OHR, Pump House Cum Chlorine Room, Laying Distribution System, Rising Main, boundary wall and service road, under Jal Jevan Mission of KHARGRAM Block of | 108.14 | 572-MSD/2023-24 | 23/02/2024 | VCH/000903/2023-2024 |
168 | Murshidabad Division | BILL/01244/2023-2024 | 21/02/2024 | SOUNAK ENTERPRISE | ORD/000685/2022-2023 | 162/MURD | 17/01/2023 | Formal work order Laying of Distribution System (part-I) , Rising Main and Providing Functional Household Tap Connection to 790 nos household & Construction of Pump House of Katlamari Zone -II of Islampur Sub-Division under Murshidabad Division,P.H.E Dte | 54.44 | 574-MSD/2023-24 | 23/02/2024 | VCH/000906/2023-2024 |
169 | Murshidabad Division | BILL/01123/2023-2024 | 25/01/2024 | MAMATA USHA ENTERPRISE | ORD/000813/2022-2023 | 671/MURD | 09/03/2023 | Formal work order for Augmentation of JALANGI ZONE-III Ground water based Piped water supply scheme to accommodate FHTC (Functional Household Tap Connection) within Jalangi Block of Murshidabad District under Murshidabad Division, PHE.Dte. | 87.50 | 536-MSD/2023-24 | 09/02/2024 | VCH/000872/2023-2024 |
170 | Murshidabad Division | BILL/01138/2023-2024 | 25/01/2024 | DECON INDIA | ORD/001636/2021-2022 | 502/MURD | 23/02/2022 | Formal Work Order for Retrofitting Functional Household Tap Connection (FHTC) under Jal Swapna ( Jal Jeevan Mission) and under command area of village of Mahesail (Village code 313954) & Amuha (Village code 313955) under Mahisail Ground Based Water Supply | 35.11 | 549-MSD/2023-24 | 09/02/2024 | VCH/000883/2023-2024 |
171 | Murshidabad Division | BILL/01191/2023-2024 | 05/02/2024 | SARTHAK SK. | ORD/000219/2023-2024 | 2328/MURD | 02/08/2023 | Ground Water based piped water supply scheme for Jaulia Part- B village, Block:- Bharatpur-II, Kandi Sub- Division in Murshidabad district under Murshidabad Division, P.H.E Dte | 6.43 | 537-MSD/2023-24 | 08/02/2024 | VCH/000873/2023-2024 |
172 | Murshidabad Division | BILL/01041/2023-2024 | 09/01/2024 | BISWAS ENGINEERING & WATER TESTING. | ORD/000772/2022-2023 | 451/MURD | 17/02/2023 | Engagement of 02(Two) nos. Chemist (01 no. Mahyampur WTP Laboratory and 01no. Jangipur WTP Sub-District Laboratory) , 02(Two)nos.Bacteriologist(01 no. Mahyampur WTP Laboratory and 01no. Jangipur WTP Sub-District Laboratory) and 02(Two)nos. Lab Assitant(0 | 3.19 | 538-MSD/2023-24 | 09/02/2024 | VCH/000825/2023-2024 |
173 | Murshidabad Division | BILL/01075/2023-2024 | 18/01/2024 | CHIEF ENGINEER CIVIL MINISTRY OF ROAD TRANSPORT AND HIGHWAYS KOLKATA | null | NHAI/RO-KOL/001/2023/10/37/002 | 01/01/2024 | Permission for laying pipeline (200 mm dia) along the NH-12 within the utility corridor from Moregram to gangadda of sagardighi surface water based drinking water supply scheme block sagardighi, district-Murshidabad under Murshidabad Division, P.H.E.Dte. | 3.18 | 543-MSD/2023-24 | 16/02/2024 | VCH/000878/2023-2024 |
174 | Murshidabad Division | BILL/01080/2023-2024 | 19/01/2024 | M H SUPPLIERS | ORD/000801/2022-2023 | 568/MURD | 28/02/2023 | Addition, Alteration & Modification of Electrical works at District laboratory in compliance with guideline of NABL Accreditation under Murshidabad Division, PHE Dte. | 2.04 | 611-MSD/2023-24 | 07/03/2024 | VCH/000959/2023-2024 |
175 | Murshidabad Division | BILL/01343/2023-2024 | 13/03/2024 | M/S.TAPAS KUMAR CHAKRABORTY | ORD/000043/2023-2024 | 1141/MURD | 26/04/2023 | Laying Distribution System & Functional Household Tap Connection (FHTC) for Augmentation of GOKARNA Water Supply Scheme under Murshidabad Division, P.H.E.Dte. | 8.61 | 625-MSD/2023-24 | 15/03/2024 | VCH/000993/2023-2024 |
176 | Murshidabad Division | BILL/01350/2023-2024 | 14/03/2024 | M/S.TAPAS KUMAR CHAKRABORTY | ORD/000222/2023-2024 | 2366/MURD | 04/08/2023 | BAIDYNATHPUR & adjoining mouzas PWSS to accommodate FHTC under Jal Jeevan Mission, Block- BURWAN of Kandi Sub Division of Murshidabad District under Murshidabad Division, PHE. Dte. | 173.07 | 645-MSD/2023-24 | 19/03/2024 | VCH/001031/2023-2024 |
177 | Murshidabad Division | BILL/01352/2023-2024 | 14/03/2024 | SUJIT KUMAR SAHA | ORD/000028/2023-2024 | 1077/MURD | 19/04/2023 | Laying Distribution System, Rising Main, FHTC, Repairing of Boundary Wall, Pump House & Existing OHR for Augmentation of Bhalkundi Zone-III Water at Supply Scheme in Khargram Block , under Murshidabad Division ,PHE.Dte. | 27.83 | 650-MSD/23-24 | 19/03/2024 | VCH/000988/2023-2024 |
178 | Murshidabad Division | BILL/01393/2023-2024 | 17/03/2024 | S.S. ENTERPRISE | ORD/000077/2023-2024 | 1380/MURD | 22/05/2023 | Augmentation of KUPILA PWSS under Jal Jivan Mission of DOMKAL Block, ISLAMPUR Subdivision , Murshidabad District under Murshidabad Division, PHE.Dte. | 168.98 | 671-MSD/2023-24 | 23/03/2024 | VCH/001043/2023-2024 |
179 | Murshidabad Division | BILL/01406/2023-2024 | 19/03/2024 | M/S. N. ISLAM AND CO. | ORD/000689/2022-2023 | 128/MURD | 16/01/2023 | Formal work order for Laying of Distribution System, Rising Main, Construction of Boundary wall , Repairing & Renovation of Pump House in connection with Augmentation of Dogachhi Zone-I Water Supply Scheme in Samsherganj Block of Murshidabad District un | 22.69 | 686-MSD/2023-24 | 23/03/2024 | VCH/001060/2023-2024 |
180 | Murshidabad Division | BILL/01407/2023-2024 | 19/03/2024 | ROY ENTERPRISE | ORD/000248/2023-2024 | 2463/MURD | 09/08/2023 | Construction 200 Cum OHR, Laying Distribution System Part-A, FHTC at Brahmanpara Village (Village Code-315290), Bahara Village (Village Code-315291) & Bhandira Village (Village Code-315292), Repairing of Existing Pump house (H.W), Boundary Wall, Existing | 37.67 | 685-MSD/2023-24 | 23/03/2024 | VCH/001048/2023-2024 |
181 | Murshidabad Division | BILL/01409/2023-2024 | 19/03/2024 | GOURANGA MONDAL | ORD/000838/2022-2023 | 758/MURD | 16/03/2023 | JAJAN & adjoining moujas PWSS to accommodate FHTC under Jal Jivan Mission, Block- BHARATPUR-I of Kandi Sub Division of Murshidabad District under Murshidabad Division, PHE.Dte. | 97.75 | 687-MSD/2023-24 | 23/03/2024 | VCH/001049/2023-2024 |
182 | Murshidabad Division | BILL/01417/2023-2024 | 18/03/2024 | MAMATA USHA ENTERPRISE | ORD/000813/2022-2023 | 671/MURD | 09/03/2023 | Formal work order for Augmentation of JALANGI ZONE-III Ground water based Piped water supply scheme to accommodate FHTC (Functional Household Tap Connection) within Jalangi Block of Murshidabad District under Murshidabad Division, PHE.Dte. | 45.51 | 681-MSD/2023-24 | 23/03/2024 | VCH/001046/2023-2024 |
183 | Murshidabad Division | BILL/01421/2023-2024 | 21/03/2024 | SANJIB GHOSH | ORD/000722/2022-2023 | 172/MURD | 18/01/2023 | Construction of 250 Cum OHR for Augmentation of Mithipur Water Supply Scheme in Raghunathganj-II Block , Jangipur Sub-Division under Murshidabad Division ,PHE.Dte. | 23.79 | 694-MSD/23-24 | 27/03/2024 | VCH/001026/2023-2024 |
184 | Murshidabad Division | BILL/01427/2023-2024 | 22/03/2024 | H.L. CONSTRUCTION (TITAN BISWAS) | ORD/000792/2022-2023 | 592/MURD | 01/03/2023 | Formal work order for construction of 250 Cum OHR, Pump House at Head Work Site & 2nd Tube well site , Laying Distribution System (PART-A), Rising Main, Boundwary Wall of GAFULIA PWSS, in Burwan Block under Murshidabad Division ,PHE.Dte. [ (i)Amount | 37.42 | 695-MSD/23-24 | 27/03/2024 | VCH/001027/2023-2024 |
185 | Murshidabad Division | BILL/01430/2023-2024 | 23/03/2024 | ASHEM ENTERPRISE | ORD/000661/2023-2024 | 3561/MURD | 21/11/2023 | Special repair and renovation of existing 2 (Two) Nos Pump House and Allied Works & Repair of Boundary Wall (140m + 50m)=190 m at T/W-I site & T/W-II site and Construction of approach road of 80 m ,3 mtr wide and 150 mm depth with 1:2:4 ordinary cement co | 8.54 | 697-MSD/23-24 | 27/03/2024 | VCH/001029/2023-2024 |
Total | 10,027.98 |