F3- Scheme wise Financial Progress
Status Report on the Expenditure executed under the Schemes as per PHED-MIS

Clear
Rs. in Lakh
Sl No. District
As per Census (2011)
Scheme Name
Scheme for which the Work Execution has been initiated
Scheme Catgory
Category of Scheme as per PHED-MIS
Sanctioned Date
Scheme Sanctioning Date as per PHED-MIS
Sanctioned Cost
Implementation Cost Sanctioned for this Scheme as per PHED-MIS
Allotment
Allotment Sanctioned for this Scheme as per PHED-MIS
Expenditure
Expenditure incurred under this Scheme as per PHED-MIS
% Expenditure
Percentage of Expenditure incurred under this Scheme as per PHED-MIS
% Physical Progress
Achievement of Physical Progress for this Scheme as per PHED-MIS
223 89,667.07 48,863.37 44,998.58 50.18 #
1 ALIPURDUAR 28&29 MILE BASTI PIPE WATER SUPPLY SCHEME ,TSM/017682 ,SM/16506 New 03/03/2023 990.41 119.52 119.00 12.02 8
2 ALIPURDUAR ATIABARI TEA GARDEN PIPED WATER SUPPLY SCHEME. ,TSM/017486 ,SM/14092 New 12/12/2022 895.42 624.20 552.61 61.72 75
3 ALIPURDUAR AUGMENTATION OF SAMUKTALA PIPED WATER SUPPLY SCHEME ,TSM/009641 ,SM/12561 Augmentation 14/09/2022 1,852.66 1,167.03 1,103.14 59.54 86
4 ALIPURDUAR AUGMENTATION OF BAKLA WATER SUPPLY SCHEME ,TSM/010085 ,SM/10667 Augmentation 29/04/2022 186.88 51.71 51.71 27.67 95
5 ALIPURDUAR AUGMENTATION OF BANCHUKAMARI WATER SUPPLY SCHEME ,TSM/010070 ,SM/10674 Augmentation 29/04/2022 236.97 106.87 105.66 44.59 80
6 ALIPURDUAR AUGMENTATION OF BHATIBARI PIPED WATER SUPPLY SCHEME ,TSM/009625 ,SM/14096 Augmentation 15/12/2022 2,031.40 999.91 899.93 44.3 38
7 ALIPURDUAR AUGMENTATION OF BHOLARDABRI PIPE WATER SUPPLY SCHEME ,TSM/009070 ,SM/09883 Augmentation 08/12/2021 451.23 303.10 301.65 66.85 98
8 ALIPURDUAR AUGMENTATION OF BHUTNIRGHAT PIPED WATER SUPPLY SCHEME ,TSM/009072 ,SM/09885 Augmentation 08/12/2021 449.91 443.61 443.61 98.6 95
9 ALIPURDUAR AUGMENTATION OF BIRPARA (APD) WATER SUPPLY SCHEME ,TSM/010080 ,SM/10671 Augmentation 29/04/2022 152.39 22.83 22.83 14.98 96
10 ALIPURDUAR AUGMENTATION OF BIRPARA WATER SUPPLY SCHEME ,TSM/010090 ,SM/14233 Augmentation 11/01/2023 2,288.93 904.04 775.81 33.89 46
11 ALIPURDUAR AUGMENTATION OF CHANDIRJHAR WATER SUPPLY SCHEME ,TSM/010067 ,SM/10677 Augmentation 29/04/2022 192.09 15.52 15.52 8.08 98
12 ALIPURDUAR AUGMENTATION OF DAKSHIN SONAPUR WATER SUPPLY SCHEME ,TSM/010087 ,SM/11970 Augmentation 29/08/2022 1,275.43 469.80 461.36 36.17 58
13 ALIPURDUAR AUGMENTATION OF DALIMPUR PWSS ,TSM/009613 ,SM/18254 Augmentation 21/06/2023 1,020.25 517.68 506.66 49.66 18
14 ALIPURDUAR AUGMENTATION OF DALMORE & RAMJHORA TEA GARDEN PIPED WATER SUPPLY SCHEME ,TSM/010082 ,SM/11960 Augmentation 25/08/2022 512.91 136.67 113.19 22.07 36
15 ALIPURDUAR AUGMENTATION OF DHUMCHIPARA TG PIPED WATER SUPPLY SCHEME. ,TSM/018074 ,SM/15210 Augmentation 07/02/2023 111.32 40.11 33.31 29.93 43
16 ALIPURDUAR AUGMENTATION OF GARGENDA TG PIPED WATER SUPPLY SCHEME. ,TSM/018091 ,SM/16824 Augmentation 13/03/2023 273.66 116.15 101.36 37.04 22
17 ALIPURDUAR AUGMENTATION OF HANTUPARA TG PIPED WATER SUPPLY SCHEME. ,TSM/018090 ,SM/15209 Augmentation 07/02/2023 112.19 36.07 36.07 32.15 52
18 ALIPURDUAR AUGMENTATION OF HASIMARA WATER SUPPLY SCHEME ,TSM/010086 ,SM/12361 Augmentation 13/09/2022 1,269.79 179.10 165.50 13.03 34
19 ALIPURDUAR AUGMENTATION OF JAGIJHORA BARABAK PIPED WATER SUPPLY SCHEME ,TSM/009622 ,SM/10169 Augmentation 16/02/2022 378.84 147.23 114.32 30.18 90
20 ALIPURDUAR AUGMENTATION OF JASHODANGA WATER SUPPLY SCHEME ,TSM/010084 ,SM/10668 Augmentation 29/04/2022 69.44 20.89 20.89 30.08 96
21 ALIPURDUAR AUGMENTATION OF JATESWAR PIPED WATER SUPPLY SCHEME ,TSM/009623 ,SM/10156 Augmentation 11/02/2022 706.17 504.48 490.98 69.53 84
22 ALIPURDUAR AUGMENTATION OF JAYANTI PIPED WATER SUPPLY SCHEME ,TSM/010849 ,SM/11402 Augmentation 04/07/2022 86.31 62.76 55.06 63.8 74
23 ALIPURDUAR AUGMENTATION OF JOGENDRAPUR WATER SUPPLY SCHEME ,TSM/010066 ,SM/10678 Augmentation 29/04/2022 274.45 73.02 73.02 26.6 47
24 ALIPURDUAR AUGMENTATION OF KAIJALI BASTY WATER SUPPLY SCHEME ,TSM/010089 ,SM/11958 Augmentation 25/08/2022 562.16 213.12 198.57 35.32 57
25 ALIPURDUAR AUGMENTATION OF KUMARGRAM PIPED WATER SUPPLY SCHEME ,TSM/009618 ,SM/11985 Augmentation 01/09/2022 2,156.38 1,149.11 1,115.53 51.73 59
26 ALIPURDUAR AUGMENTATION OF LANKAPARA TG FOR LONKAPARA HAT AREA PIPED WATER SUPPLY SCHEME ,TSM/011251 ,SM/11767 Augmentation 03/08/2022 204.15 80.06 69.05 33.82 39
27 ALIPURDUAR AUGMENTATION OF LOKNATHPUR WATER SUPPLY SCHEME ,TSM/010071 ,SM/10673 Augmentation 29/04/2022 252.98 16.34 16.34 6.46 92
28 ALIPURDUAR AUGMENTATION OF MUNSHIPARA WATER SUPPLY SCHEME ,TSM/010069 ,SM/10675 Augmentation 29/04/2022 178.64 51.29 51.29 28.71 90
29 ALIPURDUAR AUGMENTATION OF NARATHALI PIPED WATER SUPPLY SCHEME ,TSM/009621 ,SM/10154 Augmentation 11/02/2022 632.84 599.53 578.97 91.49 97
30 ALIPURDUAR AUGMENTATION OF NEPANIA PIPED WATER SUPPLY SCHEME ,TSM/011781 ,SM/11766 Augmentation 03/08/2022 88.14 47.46 47.46 53.84 64
31 ALIPURDUAR AUGMENTATION OF PASCHIM KHAIRBARI WATER SUPPLY SCHEME ,TSM/010073 ,SM/10672 Augmentation 29/04/2022 162.74 0.00 0.00 0 5
32 ALIPURDUAR AUGMENTATION OF PATLAKHAWA WATER SUPPLY SCHEME ,TSM/010852 ,SM/11401 Augmentation 04/07/2022 140.89 126.61 126.61 89.86 60
33 ALIPURDUAR AUGMENTATION OF PURBA CHEPANI WATER SUPPLY SCHEME ,TSM/010083 ,SM/10669 Augmentation 29/04/2022 161.24 20.83 18.86 11.69 33
34 ALIPURDUAR AUGMENTATION OF PURBA KATHALBARI WATER SUPPLY SCHEME ,TSM/009983 ,SM/11459 Augmentation 12/07/2022 1,873.61 1,099.14 1,095.04 58.45 60
35 ALIPURDUAR AUGMENTATION OF PUTIMARI PIPED WATER SUPPLY SCHEME ,TSM/009073 ,SM/09884 Augmentation 08/12/2021 484.93 464.08 463.25 95.53 97
36 ALIPURDUAR AUGMENTATION OF SALKUMARHAT PIPED WATER SUPPLY SCHEME ,TSM/009616 ,SM/10316 Augmentation 04/03/2022 281.05 73.92 62.36 22.19 80
37 ALIPURDUAR AUGMENTATION OF SALSALABARI WATER SUPPLY SCHEME. ,TSM/010081 ,SM/10670 Augmentation 29/04/2022 108.13 29.89 29.89 27.64 56
38 ALIPURDUAR AUGMENTATION OF TAPASHIKHATA PIPED WATER SUPPLY SCHEME ,TSM/010068 ,SM/10676 Augmentation 29/04/2022 252.39 37.01 36.37 14.41 90
39 ALIPURDUAR AUGMENTATION OF TOTOPARA AREA PIPED WATER SUPPLY SCHEME ,TSM/011786 ,SM/11765 Augmentation 03/08/2022 154.07 63.97 63.97 41.52 32
40 ALIPURDUAR AUGMENTATION OF UTTAR MAJHER DABRI PIPED WATER SUPPLY SCHEME ,TSM/009624 ,SM/10171 Augmentation 16/02/2022 750.42 627.80 618.84 82.47 97
41 ALIPURDUAR AUGMENTATION OF UTTAR SISUBARI WATER SUPPLY SCHEME ,TSM/010088 ,SM/11959 Augmentation 25/08/2022 648.63 71.05 71.05 10.95 50
42 ALIPURDUAR BALLALGURI PIPED WATER SUPPLY SCHEME ,TSM/015962 ,SM/14221 New 10/01/2023 413.54 199.67 199.67 48.28 61
43 ALIPURDUAR Bandpani Tea Garden Areas Piped Water Supply Scheme. ,TSM/005495 ,SM/11483 New 14/07/2022 528.37 299.10 270.39 51.17 60
44 ALIPURDUAR BARIGURI PIPED WATER SUPPLY SCHEME ,TSM/014599 ,SM/13246 New 14/10/2022 895.77 298.00 276.42 30.86 28
45 ALIPURDUAR BARUIPARA AND ADJOINING MOUZAS PIPED WATER SUPPLY SCHEME ,TSM/015362 ,SM/13241 New 14/10/2022 780.16 265.34 253.62 32.51 30
46 ALIPURDUAR BEECH TEA GARDEN PIPED WATER SUPPLY SCHEME ,TSM/015965 ,SM/14214 New 10/01/2023 527.26 429.17 383.83 72.8 85
47 ALIPURDUAR BENGKANDI PIPED WATER SUPPLY SCHEME ,TSM/017878 ,SM/16820 New 13/03/2023 964.09 544.20 412.65 42.8 33
48 ALIPURDUAR BHATKHAWA TEA GARDEN PIPED WATER SUPPLY SCHEME ,TSM/015968 ,SM/14211 New 10/01/2023 530.22 186.91 146.43 27.62 61
49 ALIPURDUAR BHATPARA TEA GARDEN PIPED WATER SUPPLY SCHEME ,TSM/015967 ,SM/14212 New 10/01/2023 570.23 385.68 326.42 57.24 72
50 ALIPURDUAR Bhutri Forest Piped Water Supply Scheme ,TSM/020702 ,SM/18156 New 29/03/2023 59.54 18.24 17.70 29.73 68
51 ALIPURDUAR BRAJERKUTHI PIPED WATER SUPPLY SCHEME ,TSM/015364 ,SM/13300 New 17/10/2022 944.20 568.76 561.79 59.5 85
52 ALIPURDUAR BUXA FOREST (RAJA BHATKHAWA) PIPED WATER SUPPLY SCHEME ,TSM/014604 ,SM/13249 New 14/10/2022 860.22 280.98 280.98 32.66 18
53 ALIPURDUAR BUXA PIPE WATER SUPPLY SCHEME ,TSM/017681 ,SM/16507 New 03/03/2023 219.61 18.59 18.59 8.46 3
54 ALIPURDUAR CHALNIPAK PIPED WATER SUPPLY SCHEME. ,TSM/015993 ,SM/15534 New 16/02/2023 1,024.40 458.86 458.86 44.79 39
55 ALIPURDUAR Chengmari Piped Water Supply Scheme ,TSM/020700 ,SM/18152 New 29/03/2023 772.15 383.48 369.09 47.8 48
56 ALIPURDUAR CHUNIA JHORA TEA GARDEN AREA PIPED WATER SUPPLY SCHEME ,TSM/009546 ,SM/10179 New 16/02/2022 364.15 341.77 341.25 93.71 99
57 ALIPURDUAR CHUOTA DALDALI PIPED WATER SUPPLY SCHEME. ,TSM/015656 ,SM/13242 New 14/10/2022 615.61 155.94 140.15 22.77 23
58 ALIPURDUAR DAKSHIN BARAJHAR FOREST PIPED WATER SUPPLY SCHEME ,TSM/014600 ,SM/13302 New 17/10/2022 171.75 97.16 88.70 51.64 53
59 ALIPURDUAR DAKSHIN MAJIDKHANA PIPED WATER SUPPLY SCHEME. ,TSM/015650 ,SM/13305 New 17/10/2022 760.21 458.91 458.91 60.37 83
60 ALIPURDUAR DAKSHIN PAITKAPARA PIPED WATER SUPPLY SCHEME ,TSM/009548 ,SM/10174 New 16/02/2022 732.56 664.00 640.95 87.49 95
61 ALIPURDUAR DAKSHIN RANGALIBAZNA PIPED WATER SUPPLY SCHEME ,TSM/015960 ,SM/14217 New 10/01/2023 409.38 179.16 154.73 37.8 38
62 ALIPURDUAR DALGAON TEA GARDEN PIPED WATER SUPPLY SCHEME. ,TSM/017770 ,SM/16823 New 13/03/2023 739.67 284.30 232.31 31.41 42
63 ALIPURDUAR DALMONI TEA GARDEN PIPED WATER SUPPLY SCHEME ,TSM/018324 ,SM/16821 New 13/03/2023 405.28 44.53 44.53 10.99 14
64 ALIPURDUAR DHANIRAMPUR PIPED WATER SUPPLY SCHEME ,TSM/017875 ,SM/15208 New 07/02/2023 670.33 506.89 391.35 58.38 46
65 ALIPURDUAR Dhantali Piped Water Supply Scheme ,TSM/020699 ,SM/18153 New 29/03/2023 285.56 147.02 132.69 46.47 44
66 ALIPURDUAR Dheklapara Tea Garden Area Piped Water Supply Scheme in relation with Chaa Sundari Project. ,TSM/006527 ,SM/10038 New 19/01/2022 247.03 75.89 70.85 28.68 98
67 ALIPURDUAR ETHELBARI TEA GARDEN AREA PIPED WATER SUPPLY SCHEME ,TSM/015106 ,SM/13449 New 02/11/2022 695.45 487.28 385.37 55.41 71
68 ALIPURDUAR F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Bakla Piped Water Supply Scheme (Phase-1) ,TSM/005853 ,SM/07174 Retrofitting 04/12/2020 76.33 76.33 76.07 99.67 99
69 ALIPURDUAR F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Bakla Piped Water Supply Scheme (Phase-2) ,TSM/005854 ,SM/07058 Retrofitting 25/11/2020 82.69 77.00 76.99 93.11 72
70 ALIPURDUAR F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Banchukamari Piped Water Supply Scheme (Phase-1) ,TSM/005833 ,SM/07187 Retrofitting 04/12/2020 73.94 73.94 73.94 100 75
71 ALIPURDUAR F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Banchukamari Piped Water Supply Scheme (Phase-2) ,TSM/005834 ,SM/07188 Retrofitting 04/12/2020 73.94 73.94 54.01 73.05 75
72 ALIPURDUAR F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Barobisa Piped Water Supply Scheme (Zone-1,Phase-1) ,TSM/005877 ,SM/07185 Retrofitting 04/12/2020 82.87 82.87 82.87 100 96
73 ALIPURDUAR F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Barobisa Piped Water Supply Scheme (Zone-I, Phase-2) ,TSM/005878 ,SM/07127 Retrofitting 26/11/2020 66.37 66.37 66.37 100 99
74 ALIPURDUAR F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Barobisa Piped Water Supply Scheme (Zone-II, Phase-1) ,TSM/005879 ,SM/07126 Retrofitting 26/11/2020 93.00 93.00 93.00 100 91
75 ALIPURDUAR F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Barobisa Piped Water Supply Scheme (Zone-II, Phase-2) ,TSM/005880 ,SM/07125 Retrofitting 26/11/2020 90.17 90.17 90.17 100 91
76 ALIPURDUAR F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Barobisa Piped Water Supply Scheme (Zone-III, Phase-1) ,TSM/005881 ,SM/07123 Retrofitting 26/11/2020 98.96 98.96 98.96 100 91
77 ALIPURDUAR F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Barobisa Piped Water Supply Scheme (Zone-III, Phase-2) ,TSM/005882 ,SM/07122 Retrofitting 26/11/2020 98.68 98.68 98.68 100 91
78 ALIPURDUAR F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Birpara (APD) Piped Water Supply Scheme (Phase-1) ,TSM/005855 ,SM/07175 Retrofitting 04/12/2020 91.69 91.69 91.69 100 91
79 ALIPURDUAR F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Birpara (APD) Piped Water Supply Scheme (Phase-2) ,TSM/005856 ,SM/07121 Retrofitting 26/11/2020 82.27 82.27 79.34 96.43 99
80 ALIPURDUAR F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Chotosalkumar Piped Water Supply Scheme (Phase-1) ,TSM/005857 ,SM/07059 Retrofitting 25/11/2020 97.58 97.58 97.58 100 43
81 ALIPURDUAR F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Chotosalkumar Piped Water Supply Scheme (Phase-2) ,TSM/005858 ,SM/07176 Retrofitting 04/12/2020 70.54 68.86 68.86 97.62 80
82 ALIPURDUAR F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Dalimpur Piped Water Supply Scheme (Phase-1) ,TSM/005883 ,SM/07137 Retrofitting 26/11/2020 97.16 87.69 86.26 88.79 99
83 ALIPURDUAR F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Dhaolajhora T.G Piped Water Supply Scheme ,TSM/005838 ,SM/07191 Retrofitting 04/12/2020 62.80 30.70 30.70 48.88 97
84 ALIPURDUAR F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Dima T.G Piped Water Supply Scheme ,TSM/005840 ,SM/07194 Retrofitting 04/12/2020 98.15 98.15 98.15 100 98
85 ALIPURDUAR F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Dimdima T.G Water Supply Scheme (Phase-1) ,TSM/005888 ,SM/07068 Retrofitting 25/11/2020 85.62 80.01 78.16 91.29 81
86 ALIPURDUAR F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Dimdima T.G Water Supply Scheme (Phase-2) ,TSM/005889 ,SM/07069 Retrofitting 25/11/2020 61.34 61.34 61.33 99.98 99
87 ALIPURDUAR F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Gargenda T.G Piped Water Supply Scheme ,TSM/005847 ,SM/07197 Retrofitting 04/12/2020 84.07 63.14 61.60 73.27 81
88 ALIPURDUAR F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Hantupara Tea Garden Piped Water Supply Scheme ,TSM/005866 ,SM/07064 Retrofitting 25/11/2020 99.04 95.51 95.26 96.18 99
89 ALIPURDUAR F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Jagijhora Barabak Piped Water Supply Scheme ,TSM/005844 ,SM/07129 Retrofitting 26/11/2020 72.16 72.16 72.16 100 56
90 ALIPURDUAR F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Jashodanga Piped Water Supply Scheme ,TSM/005872 ,SM/07184 Retrofitting 04/12/2020 82.41 82.41 82.27 99.83 98
91 ALIPURDUAR F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Jateswar Water Supply Scheme (Phase-1) ,TSM/005852 ,SM/07057 Retrofitting 25/11/2020 99.09 99.09 99.09 100 99
92 ALIPURDUAR F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Jayanti Piped Water Supply Scheme ,TSM/005841 ,SM/07193 Retrofitting 04/12/2020 60.86 60.86 60.86 100 98
93 ALIPURDUAR F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Jayanti T.G Piped Water Supply Scheme ,TSM/005843 ,SM/07195 Retrofitting 04/12/2020 98.84 98.84 98.84 100 99
94 ALIPURDUAR F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Kaijali Basty Piped Water Supply Scheme (Phase-1) ,TSM/005868 ,SM/07181 Retrofitting 04/12/2020 89.66 89.63 89.61 99.95 98
95 ALIPURDUAR F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Kaijali Basty Piped Water Supply Scheme (Phase-2) ,TSM/005869 ,SM/07065 Retrofitting 25/11/2020 73.85 34.11 34.11 46.19 68
96 ALIPURDUAR F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Lankapara Piped Water Supply Scheme (Phase-1) ,TSM/005884 ,SM/07138 Retrofitting 26/11/2020 96.46 96.46 96.46 100 99
97 ALIPURDUAR F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Lankapara Water Supply Scheme (Phase-2) ,TSM/005885 ,SM/07066 Retrofitting 25/11/2020 80.75 78.40 78.08 96.69 99
98 ALIPURDUAR F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Loknathpur and Amp Adj. Mouza Piped Water Supply Scheme (Phase-1) ,TSM/005870 ,SM/07182 Retrofitting 04/12/2020 98.81 98.81 98.81 100 99
99 ALIPURDUAR F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Loknathpur and Amp Adj. Mouza Piped Water Supply Scheme (Phase-2) ,TSM/005871 ,SM/07183 Retrofitting 04/12/2020 56.02 56.02 53.47 95.44 87
100 ALIPURDUAR F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Madhu T.G Piped Water Supply Scheme ,TSM/005839 ,SM/07192 Retrofitting 04/12/2020 83.76 83.76 83.76 100 99
101 ALIPURDUAR F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Makrapara T.G Piped Water Supply Scheme ,TSM/005845 ,SM/07199 Retrofitting 04/12/2020 61.63 53.58 48.89 79.32 99
102 ALIPURDUAR F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Mujnai T.G Piped Water Supply Scheme ,TSM/005846 ,SM/07198 Retrofitting 04/12/2020 69.04 64.04 62.48 90.51 98
103 ALIPURDUAR F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Munshipara Piped Water Supply Scheme (Phase-1) ,TSM/005864 ,SM/07178 Retrofitting 04/12/2020 98.08 98.08 98.03 99.95 72
104 ALIPURDUAR F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Munshipara Piped Water Supply Scheme (Phase-2) ,TSM/005865 ,SM/07179 Retrofitting 04/12/2020 69.14 42.87 42.69 61.74 72
105 ALIPURDUAR F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Paitkapara T.G Piped Water Supply Scheme ,TSM/005835 ,SM/07190 Retrofitting 04/12/2020 83.82 83.82 83.80 99.97 98
106 ALIPURDUAR F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Paschim Khairbari Piped Water Supply Scheme (Phase-1) ,TSM/005873 ,SM/07135 Retrofitting 26/11/2020 87.03 87.03 87.03 100 98
107 ALIPURDUAR F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Paschim Khairbari Piped Water Supply Scheme (Phase-2) ,TSM/005874 ,SM/07136 Retrofitting 26/11/2020 80.05 67.16 67.16 83.89 87
108 ALIPURDUAR F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Patlakhawa Piped Water Supply Scheme (Phase-1) ,TSM/005859 ,SM/07060 Retrofitting 25/11/2020 86.77 86.77 86.77 100 98
109 ALIPURDUAR F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Patlakhawa Piped Water Supply Scheme (Phase-2) ,TSM/005860 ,SM/07061 Retrofitting 25/11/2020 93.85 93.85 93.85 100 64
110 ALIPURDUAR F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Purba Chenpani Piped Water Supply Scheme (Phase-1) ,TSM/005875 ,SM/07134 Retrofitting 26/11/2020 89.44 89.44 89.40 99.95 98
111 ALIPURDUAR F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Purba Chenpani Piped Water Supply Scheme (Phase-2) ,TSM/005876 ,SM/07124 Retrofitting 26/11/2020 55.28 55.28 47.81 86.49 96
112 ALIPURDUAR F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Radharani T.G Piped Water Supply Scheme (Phase-2) ,TSM/005887 ,SM/07186 Retrofitting 04/12/2020 99.29 85.00 81.62 82.2 99
113 ALIPURDUAR F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Radharani T.G Water Supply Scheme (Phase-1) ,TSM/005886 ,SM/07067 Retrofitting 25/11/2020 98.86 98.86 98.86 100 99
114 ALIPURDUAR F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Rahimabad T.G Piped Water Supply Scheme ,TSM/005842 ,SM/07196 Retrofitting 04/12/2020 67.24 59.64 51.06 75.94 98
115 ALIPURDUAR F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Salsalabari Piped Water Supply Scheme (Phase-1) ,TSM/005862 ,SM/07177 Retrofitting 04/12/2020 68.96 68.96 68.96 100 99
116 ALIPURDUAR F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Salsalabari Piped Water Supply Scheme (Phase-2) ,TSM/005863 ,SM/07063 Retrofitting 25/11/2020 91.90 89.10 88.58 96.38 99
117 ALIPURDUAR F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Tapshikatha Piped Water Supply Scheme (Phase-2) ,TSM/005837 ,SM/07128 Retrofitting 26/11/2020 62.07 62.07 62.07 100 65
118 ALIPURDUAR F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Tapshikhata Piped Water Supply Scheme (Phase-1) ,TSM/005836 ,SM/07189 Retrofitting 04/12/2020 97.67 97.67 97.67 100 81
119 ALIPURDUAR F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Totopara Piped Water Supply Scheme ,TSM/005867 ,SM/07180 Retrofitting 04/12/2020 64.83 35.82 11.34 17.49 42
120 ALIPURDUAR F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Uttar Kamakshyaguri Piped Water Supply Scheme (Phase-1) ,TSM/005861 ,SM/07062 Retrofitting 25/11/2020 87.86 87.86 87.86 100 99
121 ALIPURDUAR FHTC under Jaldhara / Jalswapna including retrofitting of existing distribution system under DALMORE RAMJHORA T.G. Piped Water Supply Scheme (Phase-1) ,TSM/005850 ,SM/07133 Retrofitting 26/11/2020 95.65 95.65 95.65 100 99
122 ALIPURDUAR FHTC under Jaldhara / Jalswapna including retrofitting of existing distribution system under DALMORE RAMJHORA T.G. Piped Water Supply Scheme (Phase-2) ,TSM/005851 ,SM/07132 Retrofitting 26/11/2020 88.70 18.73 18.55 20.91 22
123 ALIPURDUAR FHTC under Jaldhara / Jalswapna including retrofitting of existing distribution system under DHEKLAPARA T.G. Piped Water Supply Scheme ,TSM/005849 ,SM/07131 Retrofitting 26/11/2020 73.16 67.15 67.15 91.79 50
124 ALIPURDUAR FHTC under Jaldhara / Jalswapna including retrofitting of existing distribution system under DHUMCHIPARA T.G. Piped Water Supply Scheme ,TSM/005848 ,SM/07130 Retrofitting 26/11/2020 94.15 86.11 86.11 91.46 47
125 ALIPURDUAR FHTC under Jaldhara Jalswapna Including Retrofitting of existing distribution system under the command area of CHANDIRJHAR Water Supply Scheme ,TSM/008184 ,SM/08882 Retrofitting 27/09/2021 129.45 129.45 128.72 99.44 98
126 ALIPURDUAR FHTC under Jaldhara Jalswapna Including Retrofitting of existing distribution system under the command area of HASIMARA Water Supply Scheme ,TSM/008186 ,SM/08884 Retrofitting 27/09/2021 398.83 387.21 387.18 97.08 77
127 ALIPURDUAR FHTC under Jaldhara Jalswapna Including Retrofitting of existing distribution system under the command area of SALKUMARHAT Water Supply Scheme ,TSM/008185 ,SM/08883 Retrofitting 27/09/2021 87.85 87.85 82.80 94.26 61
128 ALIPURDUAR FHTC under Jaldhara Jalswapna Including Retrofitting of existing distribution system under the command area of UTTAR MADARIHAT Water Supply Scheme ,TSM/008218 ,SM/08880 Retrofitting 27/09/2021 140.24 140.24 140.24 100 81
129 ALIPURDUAR FHTC under Jaldhara Jalswapna Including Retrofitting of existing distribution system under the command area of UTTAR SISHUBARI Water Supply Scheme ,TSM/008216 ,SM/08881 Retrofitting 27/09/2021 184.32 142.80 140.37 76.16 99
130 ALIPURDUAR FHTC under Jaldhara/Jal Sapna including retrofitting of existing distribution system under the command area of Jaigaon & Falakata water supply scheme. ,TSM/006690 ,SM/08080 Retrofitting 04/02/2021 1,224.31 900.39 898.32 73.37 72
131 ALIPURDUAR FOSKADANGA PIPED WATER SUPPLY SCHEME ,TSM/015969 ,SM/14210 New 10/01/2023 510.99 260.13 260.13 50.91 17
132 ALIPURDUAR GANGUTIA TEA GARDEN AREA PIPED WATER SUPPLY SHEME ,TSM/009551 ,SM/10180 New 16/02/2022 376.91 354.25 354.16 93.97 85
133 ALIPURDUAR GAROCHIRA BANDAPANI PIPED WATER SUPPLY SCHEME ,TSM/015963 ,SM/14216 New 10/01/2023 129.41 87.81 73.99 57.17 69
134 ALIPURDUAR GOPALPUR TEA GARDEN AREA PIPED WATER SUPPLY SCHEME ,TSM/009543 ,SM/10178 New 16/02/2022 577.33 534.44 528.00 91.45 82
135 ALIPURDUAR HOASINBAD TEA GARDEN AREA PIPED WATER SUPPLY SCHEME ,TSM/011589 ,SM/11696 New 29/07/2022 411.35 247.02 212.79 51.73 79
136 ALIPURDUAR IMPLEMENTATION OF STANDALONE WATER SUPPLY SYSTEM IN THE VILLAGES HAVING LESS THAN 100 HOUSEHOLD UNDER ALIPURDUAR DISTRICT PIPED WATER SUPPLY SCHEME ,TSM/009986 ,SM/10776 New 23/05/2022 167.97 97.37 97.37 57.96 72
137 ALIPURDUAR JAYANTI TEA GARDEN -II AREA PIPED WATER SUPPLY SCHEME ,TSM/015538 ,SM/13448 New 02/11/2022 305.16 108.57 92.74 30.39 34
138 ALIPURDUAR JAYBIRPARA TEA GARDEN AREA PIPED WATER SUPPLY SCHEME ,TSM/009547 ,SM/10177 New 16/02/2022 338.59 237.81 237.14 70.04 56
139 ALIPURDUAR KADAMBINI TEA GARDEN AREA PIPED WATER SUPPLY SCHEME ,TSM/015105 ,SM/13239 New 14/10/2022 716.98 544.31 429.62 59.92 71
140 ALIPURDUAR KALABERIA PIPED WATER SUPPLY SCHEME ,TSM/014585 ,SM/13306 New 17/10/2022 461.28 223.70 157.42 34.13 40
141 ALIPURDUAR KALCHINI TEA GARDEN AREA PIPED WATER SUPPLY SCHEME ,TSM/009552 ,SM/15482 New 13/02/2023 1,380.67 439.25 348.49 25.24 33
142 ALIPURDUAR KARTIKA TEA GARDEN AREA PIPED WAATER SUPPLY SCHEME ,TSM/012047 ,SM/11991 New 01/09/2022 432.05 332.44 331.60 76.75 88
143 ALIPURDUAR KAYAKHATA PIPED WATER SUPPLY SCHEME ,TSM/015411 ,SM/13299 New 17/10/2022 682.41 318.18 271.72 39.82 42
144 ALIPURDUAR Khagenhat Piped Water Supply Scheme ,TSM/020701 ,SM/18151 New 29/03/2023 822.98 288.75 238.94 29.03 20
145 ALIPURDUAR KOHINUR TEA GARDEN AREA PIPED WATER SUPPLY SCHEME ,TSM/013061 ,SM/12113 New 02/09/2022 821.35 384.88 367.90 44.79 78
146 ALIPURDUAR KUMARGRAM TG AREA PIPED WATER SUPPLY SCHEME ,TSM/010924 ,SM/11482 New 14/07/2022 395.23 221.81 221.30 55.99 86
147 ALIPURDUAR LACHHIMANDABRI PIPED WATER SUPPLY SCHEME ,TSM/017918 ,SM/16819 New 13/03/2023 658.29 308.70 283.22 43.02 20
148 ALIPURDUAR MADARIHAT TEA GARDEN AREA PIPED WATER SUPPLY SCHEME ,TSM/009550 ,SM/10173 New 16/02/2022 886.25 844.96 844.20 95.26 91
149 ALIPURDUAR MADHYA KAMAKHYAGURI PIPED WATER SUPPLY SCHEME ,TSM/014896 ,SM/15517 New 16/02/2023 1,067.02 597.20 586.81 55 66
150 ALIPURDUAR MADHYA KHAIRBARI PIPED WATER SUPPLY SCHEME ,TSM/014606 ,SM/13248 New 14/10/2022 877.17 532.96 426.08 48.57 37
151 ALIPURDUAR MAIRADANGA PIPED WATER SUPPLY SCHEME ,TSM/018061 ,SM/15206 New 07/02/2023 963.71 459.90 264.95 27.49 36
152 ALIPURDUAR Malangi Tea Garden Area Piped Water Supply Scheme ,TSM/020703 ,SM/18150 New 29/03/2023 561.45 102.53 50.31 8.96 33
153 ALIPURDUAR MALSAGAON PIPED WATER SUPPLY SCHEME ,TSM/017938 ,SM/16818 New 13/03/2023 777.46 590.00 511.29 65.76 39
154 ALIPURDUAR MARAKHATA PIPED WATER SUPPLY SCHEME. ,TSM/015657 ,SM/13304 New 17/10/2022 839.09 381.11 376.76 44.9 80
155 ALIPURDUAR MATHURA TEA GARDEN AREA PIPED WATER SUPPLY SCHEME ,TSM/009549 ,SM/10172 New 16/02/2022 810.28 602.25 601.19 74.2 98
156 ALIPURDUAR MECHPARA TEA GARDEN AREA PIPED WATER SUPPLY SCHEME ,TSM/009545 ,SM/10176 New 16/02/2022 426.36 311.03 207.00 48.55 56
157 ALIPURDUAR NAOTHOARTARI PIPED WATER SUPPLY SCHEME ,TSM/014598 ,SM/12754 New 20/09/2022 415.72 196.71 196.71 47.32 31
158 ALIPURDUAR NARASINGPUR PIPED WATER SUPPLY SCHEME ,TSM/017984 ,SM/15758 New 20/02/2023 842.46 679.09 501.41 59.52 33
159 ALIPURDUAR NEWLANDS TG AREA PIPED WATER SUPPLY SCHEME ,TSM/010927 ,SM/11484 New 14/07/2022 455.23 282.42 280.87 61.7 86
160 ALIPURDUAR NIMTI DOMOHANI PIPED WATER SUPPLY SCHEME ,TSM/014603 ,SM/13244 New 14/10/2022 710.27 420.38 371.18 52.26 78
161 ALIPURDUAR NIMTIJHORA TEA GARDEN PIPED WATER SUPPLY SCHEME ,TSM/015964 ,SM/14215 New 10/01/2023 336.47 195.82 129.26 38.42 63
162 ALIPURDUAR NURPUR PIPED WATER SUPPLY SCHEME. ,TSM/016017 ,SM/14218 New 10/01/2023 451.36 206.11 175.07 38.79 92
163 ALIPURDUAR PAKRIGURI PIPED WAYER SUPPLY SCHEME. ,TSM/015992 ,SM/14223 New 10/01/2023 509.75 122.11 108.22 21.23 19
164 ALIPURDUAR PARARPAR PIPED WATER SUPPLY SCHEME ,TSM/015970 ,SM/14209 New 10/01/2023 561.82 257.54 209.61 37.31 28
165 ALIPURDUAR Parpatla Khawa Piped Water Supply Scheme ,TSM/020696 ,SM/18158 New 29/03/2023 187.87 76.69 48.37 25.75 14
166 ALIPURDUAR PASCHIM CHENGMARI PIPED WATER SUPPLY SCHEME ,TSM/015365 ,SM/13240 New 14/10/2022 741.26 278.13 278.13 37.52 77
167 ALIPURDUAR PASCHIM DEOGAON PIPED WATER SUPPLY SCHEME ,TSM/017889 ,SM/15207 New 07/02/2023 802.95 299.36 299.36 37.28 51
168 ALIPURDUAR PASCHIM SATALI PIPED WATER SUPPLY SCHEME ,TSM/014601 ,SM/13245 New 14/10/2022 969.65 637.24 637.24 65.72 81
169 ALIPURDUAR PHASKHAWA TEA GARDEN AREA PIPED WATER SUPPLY SCHEME ,TSM/013062 ,SM/11992 New 01/09/2022 269.79 170.61 170.61 63.24 71
170 ALIPURDUAR PRODHANPARA PIPED WATER SUPPLY SCHEME ,TSM/014597 ,SM/13247 New 14/10/2022 638.14 215.65 211.91 33.21 28
171 ALIPURDUAR Providing FHTC of existing LDS under command area UTTARLATABARI WSS at Kalchini Block. ,TSM/010851 ,SM/10637 Augmentation 21/04/2022 252.10 124.40 124.40 49.35 93
172 ALIPURDUAR PURBA CHIKLIGURI PIPED WATER SUPPLY SCHEME ,TSM/015363 ,SM/13301 New 17/10/2022 875.66 459.61 399.39 45.61 56
173 ALIPURDUAR PURBA KHALISHAMARI PIPED WATER SUPPLY SCHEME. ,TSM/015658 ,SM/13243 New 14/10/2022 963.61 437.13 434.54 45.1 61
174 ALIPURDUAR Purbba Majherdabri Tea Garden Area Piped Water Supply Scheme ,TSM/020697 ,SM/18157 New 29/03/2023 360.16 173.23 93.19 25.87 38
175 ALIPURDUAR PURBBA NARATHALI PIPED WATER SUPPLY SCHEME. ,TSM/015628 ,SM/16537 New 10/03/2023 1,261.38 606.35 596.05 47.25 53
176 ALIPURDUAR RAJABHAT TEA GARDEN PIPED WATER SUPPLY SCHEME. ,TSM/017485 ,SM/14093 New 12/12/2022 528.73 223.66 221.24 41.84 76
177 ALIPURDUAR RANGAMATI TEA GARDEN PIPED WATER SUPPLY SCHEME ,TSM/015966 ,SM/14213 New 10/01/2023 740.97 164.10 74.26 10.02 16
178 ALIPURDUAR RAYDAK TEA GARDEN AREA PIPED WATER SUPPLY SCHEME ,TSM/012048 ,SM/12114 New 02/09/2022 588.27 348.26 322.42 54.81 66
179 ALIPURDUAR REJUVENATION OF 'BAKLA WATER SUPPLY SCHEME' ,TSM/009017 ,SM/09890 Augmentation 08/12/2021 45.21 20.92 20.92 46.26 95
180 ALIPURDUAR REJUVENATION OF 'BANCHUKAMARI WATER SUPPLY SCHEME' ,TSM/008995 ,SM/09891 Augmentation 08/12/2021 47.49 36.16 21.62 45.53 90
181 ALIPURDUAR REJUVENATION OF 'CHOTO SALKUMAR WATER SUPPLY SCHEME' ,TSM/009007 ,SM/09903 Augmentation 08/12/2021 45.22 39.00 26.27 58.1 63
182 ALIPURDUAR REJUVENATION OF 'LOKNATHPUR WATER SUPPLY SCHEME' ,TSM/009029 ,SM/09905 Augmentation 08/12/2021 45.51 11.00 11.00 24.17 99
183 ALIPURDUAR REJUVENATION OF 'PASCHIM KHAIRBARI WATER SUPPLY SCHEME' ,TSM/009028 ,SM/09900 Augmentation 08/12/2021 45.23 2.97 2.87 6.36 5
184 ALIPURDUAR REJUVENATION OF 'PURBA CHEPANI WATER SUPPLY SCHEME' ,TSM/008982 ,SM/09893 Augmentation 08/12/2021 45.22 30.26 30.26 66.91 52
185 ALIPURDUAR REJUVENATION OF 'TAPSHIKHATA WATER SUPPLY SCHEME' ,TSM/008999 ,SM/09908 Augmentation 08/12/2021 46.31 40.19 40.19 86.79 59
186 ALIPURDUAR REJUVENATION OF BIRPARA(APD) WATER SUPPLY SCHEME ,TSM/009034 ,SM/09897 Augmentation 08/12/2021 45.48 38.35 37.82 83.15 59
187 ALIPURDUAR REJUVENATION OF DHUMCHIPARA. T.G. WATER SUPPLY SCHEME ,TSM/008979 ,SM/09896 Augmentation 08/12/2021 45.23 29.82 15.77 34.87 89
188 ALIPURDUAR Rejuvenation Of Dima T.G. W.S.S ,TSM/008975 ,SM/09904 Augmentation 08/12/2021 44.51 16.93 13.51 30.36 39
189 ALIPURDUAR Rejuvenation of Gargenda Tea Garden Water Supply Scheme ,TSM/008964 ,SM/09906 Augmentation 08/12/2021 45.22 14.94 14.94 33.04 87
190 ALIPURDUAR REJUVENATION OF HANTUPARA TG WATER SUPPLY SCHEME' ,TSM/009031 ,SM/09901 Augmentation 08/12/2021 44.25 31.47 31.47 71.12 89
191 ALIPURDUAR REJUVENATION OF HASIMARA WATER SUPPLY SCHEME ,TSM/009039 ,SM/09887 Augmentation 08/12/2021 92.50 47.79 44.93 48.57 92
192 ALIPURDUAR REJUVENATION OF JAYANTI WATER SUPPLY SCHEME' ,TSM/009030 ,SM/09898 Augmentation 08/12/2021 47.48 42.47 38.71 81.54 67
193 ALIPURDUAR REJUVENATION OF MADHU TG WATER SUPPLY SCHEME ,TSM/009041 ,SM/09909 Augmentation 08/12/2021 45.46 38.37 35.45 77.97 61
194 ALIPURDUAR REJUVENATION OF MADHYA PAROKATA PIPED WATER SUPPLY SCHEME ,TSM/009071 ,SM/09886 Augmentation 08/12/2021 257.81 246.85 244.39 94.79 98
195 ALIPURDUAR Rejuvenation of Makrapara TG WSS. ,TSM/008906 ,SM/09895 Augmentation 08/12/2021 45.22 42.81 42.81 94.67 73
196 ALIPURDUAR REJUVENATION OF MUNSHIPARA WATER SUPPLY SCHEME ,TSM/009036 ,SM/09894 Augmentation 08/12/2021 44.01 27.25 27.25 61.93 57
197 ALIPURDUAR REJUVENATION OF PAITKAPARA WATER SUPPLY SCHEME ,TSM/009033 ,SM/09910 Augmentation 08/12/2021 47.45 23.06 23.06 48.6 95
198 ALIPURDUAR REJUVENATION OF SALSALABARI WATER SUPPLY SCHEME ,TSM/008978 ,SM/09907 Augmentation 08/12/2021 44.74 2.12 2.39 5.35 99
199 ALIPURDUAR REJUVENATION OF SIDHABARI PIPED WATER SUPPLY SCHEME ,TSM/018098 ,SM/16115 Augmentation 22/02/2023 240.25 61.62 0.00 0 58
200 ALIPURDUAR REJUVENATION OF TATPARA PIPED WATER SUPPLY SCHEME ,TSM/009619 ,SM/10155 Augmentation 11/02/2022 140.66 136.56 136.56 97.09 94
201 ALIPURDUAR REJUVENATION OF UTTAR KAMAKHYAGURI PIPED WATER SUPPLY SCHEME ,TSM/009620 ,SM/10170 Augmentation 16/02/2022 509.72 322.12 307.59 60.35 93
202 ALIPURDUAR REJUVINATION OF ' UTTAR MADARIHAT WATER SUPPLY SCHEME' ,TSM/009040 ,SM/09902 Augmentation 08/12/2021 47.49 37.43 27.80 58.53 69
203 ALIPURDUAR REJUVINATION OF 'CHANDIRJHAR WATER SUPPLY SCHEME' ,TSM/009038 ,SM/09892 Augmentation 08/12/2021 47.49 34.43 32.83 69.14 99
204 ALIPURDUAR REJUVINATION OF 'DHAOLAJHORA .T.G WATER SUPPLY SCHEME' ,TSM/009035 ,SM/09888 Augmentation 08/12/2021 43.87 29.08 28.53 65.05 62
205 ALIPURDUAR REJUVINATION OF 'JASHODANGA WATER SUPPLY SCHEME' ,TSM/009037 ,SM/09899 Augmentation 08/12/2021 45.28 36.01 34.57 76.35 98
206 ALIPURDUAR SANKOSH TG AREA PIPED WATER SUPPLY SCHEME ,TSM/010925 ,SM/11485 New 14/07/2022 389.92 251.38 237.75 60.97 78
207 ALIPURDUAR SHRINATHPUR TEA GARDEN AREA PIPED WATER SUPPLY SCHEME ,TSM/011590 ,SM/11709 New 29/07/2022 817.44 676.55 666.03 81.48 90
208 ALIPURDUAR SIDHABARI PIED WATER SUPPLY SCHEME ,TSM/009544 ,SM/10175 New 16/02/2022 360.32 308.83 301.46 83.66 60
209 ALIPURDUAR SISHA JUMRHA PIPED WATER SUPPLY SCHEME ,TSM/014605 ,SM/12753 New 20/09/2022 797.79 487.44 458.04 57.41 62
210 ALIPURDUAR Supply of Potable Drinking Water to Lankapara Tea Garden Area Piped Water Supply Scheme in relation with Chaa Sundari Project. ,TSM/006526 ,SM/10054 New 25/01/2022 332.16 135.90 93.89 28.27 5
211 ALIPURDUAR Supply of potable drinking water to Mujnai Tea Garden in relation with Chaa Sundari Project. ,TSM/006524 ,SM/08580 New 10/02/2021 295.97 202.31 186.05 62.86 100
212 ALIPURDUAR TASTI TEA GARDEN PIPED WATER SUPPLY SCHEME. ,TSM/017771 ,SM/16822 New 13/03/2023 569.65 154.36 154.36 27.1 19
213 ALIPURDUAR TELIPARA PIPED WATER SUPPLY SCHEME. ,TSM/015706 ,SM/13303 New 17/10/2022 488.14 196.80 125.59 25.73 52
214 ALIPURDUAR TORSHA FOREST PIPED WATER SUPPLY SCHEME ,TSM/015971 ,SM/14220 New 10/01/2023 142.14 95.99 95.99 67.53 80
215 ALIPURDUAR Torsha Tea Garden Area Piped Water Supply Scheme in relation with Chaa Sundari Project. ,TSM/006525 ,SM/10039 New 19/01/2022 284.23 262.75 262.75 92.44 98
216 ALIPURDUAR TURTURI PIPED WATER SUPPLY SCHEME. ,TSM/016016 ,SM/14219 New 10/01/2023 948.08 434.00 342.18 36.09 57
217 ALIPURDUAR UMACHARANPUR PIPED WATER SUPPLY SCHEME ,TSM/017944 ,SM/16114 New 22/02/2023 950.07 388.99 285.34 30.03 15
218 ALIPURDUAR UTTAR BARAJHAR FOREST PIPE WATER SUPPLY SCHEME ,TSM/017679 ,SM/15914 New 22/02/2023 358.24 45.73 28.14 7.86 9
219 ALIPURDUAR UTTAR DEOGAON PIPED WATER SUPPLY SCHEME ,TSM/018017 ,SM/16817 New 13/03/2023 808.50 483.90 408.95 50.58 28
220 ALIPURDUAR Uttar Dhalkar Piped Water Supply Scheme ,TSM/020698 ,SM/18154 New 29/03/2023 404.14 178.91 128.44 31.78 19
221 ALIPURDUAR UTTAR MAJID KHANA PIPED WATER SUPPLY SCHEME ,TSM/014886 ,SM/16538 New 10/03/2023 1,074.69 449.78 433.29 40.32 66
222 ALIPURDUAR UTTAR MANDABARI PIPED WATER SUPPLY SCHEME ,TSM/014602 ,SM/16539 New 10/03/2023 1,121.63 668.31 668.31 59.58 64
223 ALIPURDUAR UTTAR RANGALIBAZNA PIPED WATER SUPPLY SCHEME ,TSM/015961 ,SM/14222 New 10/01/2023 429.71 200.97 176.53 41.08 37
Total 89,667.07 48,863.37 44,998.58 50.18 #