B4- Dropped Scheme
Status Report on the Schemes Delisted after the Approval of SLSSC

Clear
Rs. in Lakh
Sl. No. District
As per Census (2011)
Division
Working Division
Scheme
Schemes that are Delisted after approval in SLSSC post 2019-2020 as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
SLSSC Date
Date of SLSSC in which the Scheme has been Approved
FHTCs
Modified FHTC Count after the appropriation in YDU considered under the Schemes Delisted after approval in SLSSC post 2019-2020 as per PHED-MIS
Cost
Modified Implementation Cost after the appropriation in YDU considered under the Schemes Delisted after approval in SLSSC post 2019-2020 as per PHED-MIS
3 1,058 960.28
1 BANKURA Bankura Division Retrofitting works for creation of 'FHTC (Funtional House Hold Tap Connection' in connection with Jal Jeevan Mission (JJM) and JAL SWAPNA of SOMSAR W/S Scheme under Bishnupur Sub - Division of Bankura Division, PHE Dte. (Part-A),TSM/006019,SM/09307 Retrofitting 25/09/2020 1058 94.39
2 BANKURA Bankura Mechanical Division Construction of Grid-Connected solar photo -voltaic system for Sonabundh PWS scheme Dist Bankura,TSM/018845 Augmentation 16/11/2022 0 34.74
3 BANKURA Bankura Division Augmentation of piped water supply schemes for Sanaband , Kargahir and its adjoining mouzas,TSM/005014 Augmentation 05/11/2019 0 831.15
Total 1,058 960.28