Sl. No. | District
As per Census (2011)
|
Division
Working Division
|
Scheme
Schemes that are Delisted after approval in SLSSC post 2019-2020 as per PHED-MIS
|
Scheme Category
Category of Scheme as per PHED-MIS
|
SLSSC Date
Date of SLSSC in which the Scheme has been Approved
|
FHTCs
Modified FHTC Count after the appropriation in YDU considered under the Schemes Delisted after approval in SLSSC post 2019-2020 as per PHED-MIS
|
Cost
Modified Implementation Cost after the appropriation in YDU considered under the Schemes Delisted after approval in SLSSC post 2019-2020 as per PHED-MIS
|
---|---|---|---|---|---|---|---|
3 | 18,650 | 1,239.89 | |||||
1 | PURBA BARDHAMAN | Burdwan Division | Rretrofitting wroks for Providing Functional Household Tap Connection (FHTC) within the commend area of Bhatar Piped Water Supply Scheme,TSM/006670,SM/08032 | Retrofitting | 04/12/2020 | 16945 | 921.25 |
2 | PURBA BARDHAMAN | Burdwan Division | Augmentation of Jahannagar PWSS for providing Functional House Hold Tap Connection (FHTC),TSM/008346 | Augmentation | 19/08/2021 | 1705 | 230.99 |
3 | PURBA BARDHAMAN | Burdwan Division | Providing House Connection from existing distribution system within the jurisdiction of Lohai Piped Water Supply Scheme.,TSM/005480 | Augmentation | 17/02/2020 | 0 | 87.65 |
Total | 18,650 | 1,239.89 |