1 |
Alipurduar Division |
HARIDAS GHOSH |
Supply of CIPE Special & CI Jeffy Coupling for Dakshin Paitkapara Water Supply Scheme under Alipurduar Division P.H.E. Dte. (699/ALD DT:08/06/2022)
Construction of Pump House, Boundary Wall, Tube well Boring by Reverse Rotary Method of drilling at H/W si |
000448 |
|
610/ALD |
29/02/2024 |
2 |
9.63 |
DAKSHIN PAITKAPARA PIPED WATER SUPPLY SCHEME (SM/10174) |
9.63 |
0 |
2 |
Alipurduar Division |
FAUDA SINGH CHHETRI |
Tube well Boring by ODEX-165 Method of drilling at TUBE WELL site including laying distribution system with new HDPE pipeline ,One nos pump house & boundary wall, providing FHTC and others allied works for Bhutri Forest PWSS Under Alipurduar Division PHE |
000448ORD/000010/2023-202 |
ORD/000010/2023-2024 |
94/ALD |
18/04/2023 |
1 |
4.07 |
Bhutri Forest Piped Water Supply Scheme (SM/18156) |
4.07 |
0 |
3 |
Alipurduar Division |
TAPASH KUMAR BHOWMICK |
Constructions of pump house and Tube well Boring by ODEX-165 Method of drilling at HW site and 2nd site , Laying of distribution system with HDPE pipeline including rising main & delivery connection , Constructions of 100 Cum OHR as per Departmental Desig |
000448ORD/000021/2023-202 |
ORD/000021/2023-2024 |
237/ALD |
04/05/2023 |
1 |
107.67 |
Uttar Dhalkar Piped Water Supply Scheme (SM/18154) |
107.67 |
0 |
4 |
Alipurduar Division |
DILIP MAHATO |
CONS. OF RESERVOIR (100M3), BOUNDARY WALL (80m), PUMP HOUSE (1No.), TUBE WELL (2 Nos.), RISING MAIN AND LAND DEVELOPMENT FOR TORSHA (Hat Khola Line, Naya Line, 3 No. Line (A) AND (B) and Khoyar line) 256 unit CHA SUNDARAI WATER SUPPLY SCHEME UNDER ALIPURD |
000448ORD/000028/2022-202 |
ORD/000028/2022-2023 |
282/ALD |
26/04/2022 |
1 |
30.44 |
Torsha Tea Garden Area Piped Water Supply Scheme in relation with Chaa Sundari Project. (SM/10039) |
30.44 |
30.44 |
5 |
Alipurduar Division |
MAHENDRA CHHETRI |
Construction of 150cum. OHR for PURBA KATHALBARI ZONE-IV Water Supply Scheme under Alipurduar Division, PHE Dte. |
000448ORD/000149/2022-202 |
ORD/000149/2022-2023 |
984/ALD |
15/07/2022 |
1 |
17.63 |
AUGMENTATION OF PURBA KATHALBARI WATER SUPPLY SCHEME (SM/11459) |
17.63 |
17.63 |
6 |
Alipurduar Division |
MITHUN DAS |
Laying of distribution of UPVC/DI/GI pipeline including FHTC for DALIMPUR PWSS under Alipurduar Division, PHE DTE. PART-2 |
000448ORD/000165/2023-202 |
ORD/000165/2023-2024 |
970/ALD |
12/07/2023 |
1 |
16.95 |
AUGMENTATION OF DALIMPUR PWSS (SM/18254) |
16.95 |
0 |
7 |
Alipurduar Division |
GHOSH & SAHA CONSTRUCTION |
Laying balance portion pipeline and providing house connection at Jayanti Water Supply Scheme and Bhutiya Busty Area under Alipurduar Division, PHE Dte. |
000448ORD/000202/2021-202 |
ORD/000202/2021-2022 |
975/ALD |
13/09/2021 |
1 |
5.03 |
REJUVENATION OF JAYANTI WATER SUPPLY SCHEME' (SM/09898) |
5.03 |
5.03 |
8 |
Alipurduar Division |
TAPASH KUMAR BHOWMICK |
Laying distribution system with new HDPE pipeline (Part- B) and providing FHTC and others allied works for SHRINATHPUR TG AREA PWSS under Alipurduar Division, PHE Dte. |
000448ORD/000286/2022-202 |
ORD/000286/2022-2023 |
1640/ALD |
19/09/2022 |
1 |
45.4 |
SHRINATHPUR TEA GARDEN AREA PIPED WATER SUPPLY SCHEME (SM/11709) |
45.4 |
45.4 |
9 |
Alipurduar Division |
BHAGWATI BHUJEL |
Gap filling of HDPE pipeline at Nepania Division area under Alipurduar Division, PHE Dte. |
000448ORD/000325/2023-202 |
ORD/000325/2023-2024 |
2422/ALD |
09/11/2023 |
1 |
5.01 |
AUGMENTATION OF NEPANIA PIPED WATER SUPPLY SCHEME (SM/11766) |
5.01 |
0 |
10 |
Alipurduar Division |
TAPASH DAS |
Construction of Pump House ,Boundary Wall , Tube well Boring ( Reverse Rotary Method) and Rising Main for Additional T/W of MUNSHIPARA Piped Water Supply Scheme Under Alipurduar Division PHE DTE |
000448ORD/000326/2021-202 |
ORD/000326/2021-2022 |
2227/ALD |
14/01/2022 |
1 |
9.85 |
REJUVENATION OF MUNSHIPARA WATER SUPPLY SCHEME (SM/09894) |
9.85 |
0 |
11 |
Alipurduar Division |
ASHOK SAPKOTA |
Tube well Boring by ODEX-165 method of drilling at 2nd TW Site, Construction of Pump house at 2nd site, laying of Rising Main and delivery line connection, providing FHTC and other allied works for Phaskhawa Tea Garden PWSS under Alipurduar Division, PHE |
000448ORD/000329/2022-202 |
ORD/000329/2022-2023 |
2238/ALD |
21/11/2022 |
1 |
14.76 |
PHASKHAWA TEA GARDEN AREA PIPED WATER SUPPLY SCHEME (SM/11992) |
14.76 |
0 |
12 |
Alipurduar Division |
DAS CONSTRUCTION |
Construction of Pump House Boundary Wall Land development & pathway TW Boring (2nd Suite of OHR-1 ODEX 165) Raising Main for Jainti TG PWSS at Kumargram under Alipurduar Division. |
000448ORD/000335/2019-202 |
ORD/000335/2019-2020 |
2020/ALD |
20/03/2020 |
1 |
4.53 |
REJUVENATION OF JAYANTI WATER SUPPLY SCHEME' (SM/09898) |
4.53 |
4.53 |
13 |
Alipurduar Division |
JAYDAB ADHIKARI |
Sample collection from different facilator less gram panchayat for 12 months under Alipurduar Division, PHE Dte. |
000448ORD/000344/2023-202 |
ORD/000344/2023-2024 |
2545/ALD |
28/11/2023 |
1 |
1.73 |
DRINKINH WATER SAMPLE COLLECTION & TESTING THROUGH FIELD TEST KIT (FTKs) & UPLOADING CHARGES FOR THE SAME RELATED TO WATER QUALITY MONITORING & SURVEILLANCE PROGRAMME UNDER JAL JEEVAN MISSION (SM/11752) |
1.73 |
0 |
14 |
Alipurduar Division |
HARIDAS GHOSH |
Laying of rising main/distribution pipeline, supply of DI pipe and specials, horizontal boring by HDD method, bridge and culvert crossing, along with the other allied works at Dakshin Majidkhana PWSS under under Alipurduar Division, PHE Dte. |
000448ORD/000395/2023-202 |
ORD/000395/2023-2024 |
206/ALD |
16/01/2024 |
1 |
6.24 |
DAKSHIN MAJIDKHANA PIPED WATER SUPPLY SCHEME. (SM/13305) |
6.24 |
0 |
15 |
Alipurduar Division |
DILIP MAHATO |
Construction of 400cum OHR for Augmentation of Uttar Kamakhyaguri Water Supply Scheme under Alipurduar Division, PHE Dte. |
000448ORD/000412/2021-202 |
ORD/000412/2021-2022 |
2580/ALD |
17/02/2022 |
1 |
40.78 |
REJUVENATION OF UTTAR KAMAKHYAGURI PIPED WATER SUPPLY SCHEME (SM/10170) |
40.78 |
40.78 |
16 |
Alipurduar Division |
SUBHAS CHANDRA ROY |
Construction of Pump House ,Boundary Wall and Tube well Boring by ODEX-165 Method of drilling including Rising Main for JAGIJHORA BARABAK PWSS under Alipurduar Division PHE DTE |
000448ORD/000425/2021-202 |
ORD/000425/2021-2022 |
2609/ALD |
17/02/2022 |
1 |
6.02 |
AUGMENTATION OF JAGIJHORA BARABAK PIPED WATER SUPPLY SCHEME (SM/10169) |
6.02 |
0 |
17 |
Alipurduar Division |
APSARI BHOWMICK |
Extension work order for Hiring of Diesel vehicle Maxi Cab(At least 7 seater) for Executive Engineer, Alipurduar Division under Alipurduar Division, PHE Dte.( 01.04.2021 to 30.06.2021) |
000448ORD/000609/2020-202 |
ORD/000609/2020-2021 |
3051/ALD |
31/03/2021 |
1 |
0.54 |
REJUVENATION OF BIRPARA(APD) WATER SUPPLY SCHEME (SM/09897) |
0.54 |
0 |