F4- Undisbursed Fund

Rs. in Lakh
SL No Division Agency Work Name Unique Order No System Order No Order Memo No Order Date No of Bills Bill Amount Scheme Requisition Amount Allotment Amount
6 6 189.19 # 189.19 189.19
1 Berhampur Division I M/S GOUTAM CHAKRABORTY Replacement of sand layers, Activated Alumina & existing gravel for Modified Sujapur Sadipur Model after washing of AIRP allied (Capacity 30.50 Cum/hr) at Hasanpur Water Supply Scheme under Jal Jivan Mission of Bhagwangola-II Block under Berhampore Div-I, 000206ORD/000017/2024-202 ORD/000017/2024-2025 925/BD-I 07/06/2024 1 22.43 Augmentation of Ground Water Based Piped Water Supply Scheme for Hasanpur (SM/12584) 22.43 22.43
2 Berhampur Division I MAMATA USHA ENTERPRISE Augmentation of Koasbagoas Piped water supply scheme to accommodate construction of OHR, Arsenic cum Iron Removal Plant (AIRP), pump house and service road, laying of design pipeline and providing FHTC (Functional Household Tap Connection ) under Jal Jeev 000206ORD/000023/2023-202 ORD/000023/2023-2024 375/BD-I 28/06/2023 1 95.6 AUGMENTATION OF GROUND WATER BASED KOASBAGOAS PWSS RANINAGAR -I BLOCK WITHIN MURSHIDABAD DISTRICT UNDER BERHAMPORE DIVISION -I , PHE DTE. (SM/16353) 95.6 95.6
3 Berhampur Division I ULTRA CONSTRUCTION Replacement of sand layers, Activated Alumina & existing gravel for Modified Sujapur Sadipur Model after washing of AIRP allied (Capacity 07.00 Cum/hr) at Ramnapara Water Supply Scheme under Jal Jeevan Mission of Bhagwangola-II Block under Berhampore Div- 000206ORD/000025/2024-202 ORD/000025/2024-2025 972/BD-I 18/06/2024 1 14.11 Augmentation of Ground Water Based Piped Water Supply Scheme for Ramnapara. (SM/12740) 14.11 14.11
4 Berhampur Division I HARUN ALL RASHID & BROTHERS Sinking of 250mm x 150 mm dia tube well 120.00 mtr. deep by direct rotary rig method using UPVC Pipe and UPVC Deep Well Screen (RDS) filter at Rajarampur Water Supply Scheme in connection with Augmentation work under Berhampore Division - I, P.H.Engine 000206ORD/000037/2023-202 ORD/000037/2023-2024 139/BD-I 12/05/2023 1 15.62 AUGUMENTATION OF GROUND WATER BASED PIPED WATER SUPPLY SCHEME FOR RAJARAMPUR,BLOCK - LALGOLA , DISTRICT- MURSHIDABAD. (SM/14432) 15.62 15.62
5 Berhampur Division I PRATICHI ENTERPRISE Augmentation of Komnagar Piped water supply scheme to accommodate construction of OHR , laying of design pipeline and providing FHTC (Functional Household Tap Connection ) under Jal Jeevan Mission in Raninagar-II Block of Murshidabad District under Berham 000206ORD/000122/2023-202 ORD/000122/2023-2024 506/BD-I 24/07/2023 1 34.45 Augmentation of Ground Water Based Piped Water Supply Scheme for Komnagar . (SM/14049) 34.45 34.45
6 Berhampur Division I MS GUNGUN CONSTRUCTION Water Supply arrangement for arsenic affected habitation with SOLAR Power connection by Construction /installation of CPP unit including Tubewell with Submersible pump ( for Population 351 - 500 & Raw Water As concentration upto 0.15 ppm ) in connection w 000206ORD/000347/2023-202 ORD/000347/2023-2024 288/BD-I 21/02/2024 1 6.98 Water Supply arrangement for remaining arsenic affected habitation with solar power connection by construction installation of 50 no CPP unit including submersible Tube well consists of population 351-500 and raw water as concentration upto 0.15 ppm at d (SM/09855) 6.98 6.98
Total 6 189.19 # 189.19 189.19