F4- Undisbursed Fund

Rs. in Lakh
SL No Division Agency Work Name Unique Order No System Order No Order Memo No Order Date No of Bills Bill Amount Scheme Requisition Amount Allotment Amount
51 53 1,742.93 # 1,742.93 1,742.93
1 Malda Division PROSANTA MANDAL Monthly Remuneration of Sri Prosanta Mandal , Contractual Assistant Engineer (Civil) For the Month of June 2024 000118 3260/MD 28/06/2024 1 6.16 Engagement of Contractual Assistant Engineers engaged in various divisions related to Support Activity under Jal Jeevan Mission (SM/11975) 6.16 6.16
2 Malda Division USHA ENTERPRISE Formal work order for the work of Construction of 900 M³ Capacity OHR with FHTC of Aridanga Zone-I Piped Water Supply Scheme at Ratua-II Dev. Block under Malda Division, PHE Dte. in the District of Malda. 000118ORD/000005/2023-202 ORD/000005/2023-2024 1572/MD 10/04/2023 1 65.26 AUGMENTATION OF ARIADANGA PIPED WATER SUPPLY SCHEME (SM/10181) 65.26 65.26
3 Malda Division ACQUA CONSTRUCTION CONSORTIUM Formal work order for the work of Augmentation of Bulbulchandi Piped water supply scheme for the work of Geotechnical Study,construction of 700 Cum RCC OHR,Laying Distribution of pipe line and providing Functional Household Tap connection (FHTC) within H 000118ORD/000006/2022-202 ORD/000006/2022-2023 1125/MD 19/05/2022 1 114.55 Augmentation of Bulbulchandi PWSS. (SM/09422) 114.55 114.55
4 Malda Division M/S GUHA & ROY ENTERPRISE Formal work order for the work of Installation of Stand-Alone Community Purification Plant (CWPP) at different Anganwadi Centres (AWCs) of G.P.- Madnabati, Gobindapur & Maheshpur and Chandpur in Bamangola Dev. Block, Malda under Malda Division, PHE Dte. 000118ORD/000009/2022-202 ORD/000009/2022-2023 1134/MD 20/05/2022 1 32.31 INSTALLATION OF 100 Nos. STAND ALONE COMMUNITY PURIFICATION PLANT(CWPP) AT ANGANWADI CENTRES OF GP MADNABATI,GOBINDAPUR & MAHESHPUR AND CHANDPUR IN BAMONGOLA DEV BLOCK ,MALDA UNDER MALDA DIVISION,PHE DTE (SM/10215) 32.31 32.31
5 Malda Division SUBHAS CHANDRA KESHARI Formal work order for the work of Construction of 700 M3 Capacity OHR with Soil Investigation and FHTC of Kushida Piped Water Supply Scheme at Harishchandrapur-I Block of Malda District under Malda Division, PHE Dte, Govt. of West Bengal. 000118ORD/000009/2023-202 ORD/000009/2023-2024 1569/MD 10/04/2023 1 52.01 Augmentation of Khusida Piped Water Supply Scheme (SM/10397) 52.01 52.01
6 Malda Division UTTAM KUMAR GHOSH Formal work order for the work of Construction of 400 M³ Capacity OHR with FHTC of ARIDANGA ZON-II Piped Water Supply Scheme at Ratua-II Dev. Block under Malda Division, PHE Dte. in the District of Malda. 000118ORD/000014/2023-202 ORD/000014/2023-2024 1649/MD 13/04/2023 1 50.4 AUGMENTATION OF ARIADANGA PIPED WATER SUPPLY SCHEME (SM/10181) 50.4 50.4
7 Malda Division MANIK CHANDRA SAHA Formal work order for the work of Augmentation of TULSHIHATTA ZONE-II Piped Water Supply Scheme at Harishchandrapur-I Block of Malda district under Malda Division, PHE Dte., Govt. of West Bengal. 000118ORD/000038/2023-202 ORD/000038/2023-2024 1885/MD 08/05/2023 1 111.69 Ground Water Based for Tulshihatta Zone-II Piped Water Supply Scheme under Malda Division, PHE Dte. (SM/11587) 111.69 111.69
8 Malda Division BANIK BROTHERS Formal work order for the work of Implementation of TALPUKUR Water Supply Scheme at Habibpur Block of Malda district under Malda Division, PHE Dte., Govt. of West Bengal. 000118ORD/000043/2023-202 ORD/000043/2023-2024 1899/MD 10/05/2023 1 41.29 TALPUKUR Piped Water Supply Scheme (SM/12189) 41.29 41.29
9 Malda Division M/S. TEWARI CONSTRUCTION Formal work order for the work of Augmentation of BHINGOLE Piped Water Supply Scheme at Harishchandrapur-I Block of Malda district under Malda Division, PHE Dte., Govt. of West Bengal. 000118ORD/000084/2023-202 ORD/000084/2023-2024 2321/MD 08/06/2023 1 36.5 AUGMENTATION OF BHINGOL PIPED WATER SUPPLY SCHEME (SM/15948) 36.5 36.5
10 Malda Division M/S S. D. ENTERPRISE Formal work order for the work of Implementation of MEHERPUR Piped Water Supply Scheme at Old Malda Block of Malda district under Malda Division, PHE Dte., Govt. of West Bengal. 000118ORD/000219/2023-202 ORD/000219/2023-2024 2683/MD 13/07/2023 1 43.66 MEHERPUR PIPED WATER SUPPLY SCHEME (SM/15222) 43.66 43.66
11 Malda Division GOBINDA ENTERPRISE Formal work order for the work of Implementation of KHARANGAPUR JABRA Piped Water Supply Scheme at Harishchandrapur-I Block of Malda district under Malda Division, PHE Dte., Govt. of West Bengal. 000118ORD/000232/2023-202 ORD/000232/2023-2024 2709/MD 14/07/2023 1 24.17 KHARANGAPUR JABRA Piped Water Supply Scheme (SM/12183) 24.17 24.17
12 Malda Division MATIUR RAHAMAN Formal work order for the work of Construction of 600 M3 Capacity OHR with FHTC (Mouza- Jaitan, Mirzapur, Mukuli and Salalpur) of Mirzapur Piped Water Supply Scheme at Bamangola Block of Malda District under Malda Division, PHE Dte, Govt. of West Bengal. 000118ORD/000312/2023-202 ORD/000312/2023-2024 2917/MD 31/07/2023 1 55.19 Augmentation of Mirzapur Piped Water Supply Scheme (SM/10317) 55.19 55.19
13 Malda Division MANIK CHANDRA SAHA Acceptance cum formal work order for Extension of Pipe line and Replacing of damage A.C pipe lineby different dia UPVC pipe for PANNAPUR Piped Water Supply Scheme ( Nimnail, Jahanabad) of Habibpur Block in the District of Malda under Malda Division, PHE D 000118ORD/000364/2022-202 ORD/000364/2022-2023 2605/MD 10/11/2022 1 0.61 Source Augmentation of Pannapur Piped Water Supply Scheme under Malda Division, PHE Dte. (SM/12315) 0.61 0.61
14 Malda Division A. L. ENGINEERING SOLUTION Acceptance cum formal work order for Sinking of (250mm. Dia. x 200 mm. dia.) Big dia. Tube Well (120 Mtr. Deep) by D.R. Rig method using P.V.C. pipe and Gravel Filter including supply of Materials at MEKPUR Piped Water Supply Scheme (Tube Well No-4) of O 000118ORD/000377/2022-202 ORD/000377/2022-2023 2703/MD 17/11/2022 1 8.5 Source Augmentation of Mekpur Piped Water Supply Scheme under Malda Division, PHE Dte. (SM/12763) 8.5 8.5
15 Malda Division ZEOLITE FRESH INDIA Acceptance cum formal work order for Installation of Stand-Alone Community Purification Plant (CWPP) for AWC's at Boroi Mahendrapur GP of Harishchandrapur-I Dev. Block under Malda Division, PHE Dte. (QTY:- 7 Nos.) 000118ORD/000392/2022-202 ORD/000392/2022-2023 2720/MD 17/11/2022 1 33.6 INSTALLATION OF 89 Nos. STAND ALONE COMMUNITY PURIFICATION PLANT(CWPP) AT ANGANWADI CENTRES(AWCs) OF HARISHCHANDRAPUR-I DEV BLOCK MALDA UNDER MALDA DIVISION,PHE DTE (SM/10304) 33.6 33.6
16 Malda Division BIDYUT MAHALDAR Acceptance cum formal work order for Extension of UPVC pipe line laying for Providing Functional Household Tap Connection (FHTC) in connection with Jal Jeevan Mission (JJM ) under command area of Khanpur-Hulaspur W/S Scheme at Chanchal-I Block under Mald 000118ORD/000403/2022-202 ORD/000403/2022-2023 2963/MD 07/12/2022 1 7.03 Providing Functional Household Tap Connection (FHTC) in connection with Jal Jeevan Mission (JJM and JAL SWAPNA) under command area of different Water Supply Schemes at different Blocks under Malda Division, PHE Dte (SM/07973) 7.03 7.03
17 Malda Division M/S BABLU ENTERPRISE Providing Functional Household Tap Connection (FHTC) in connection with Jal Jeevan Mission (JJM) under command area of Altor Water Supply Scheme at Gazole Dev. Block under Malda Division, PHE Dte. in the district of Malda. 000118ORD/000447/2023-202 ORD/000447/2023-2024 3364/MD 29/08/2023 1 13.05 Providing Functional Household Tap Connection (FHTC) in connection with Jal Jeevan Mission (JJM and JAL SWAPNA) under command area of ALTOR Water Supply Scheme (SM/06852) 13.05 13.05
18 Malda Division GOBINDA ENTERPRISE Providing Functional Household Tap Connection (FHTC) in connection with Jal Jeevan Mission (JJM) under command area of Mabrakpur Water Supply Scheme at Old Malda Dev. Block under Malda Division, PHE Dte. in the district of Malda. 000118ORD/000448/2023-202 ORD/000448/2023-2024 3365/MD 29/08/2023 1 36.26 Providing Functional Household Tap Connection in connection with Jal Jeevan Mission (JJM and JAL SWAPNA) under command area of Bahirgachhi, Purba Binodpur, Sankail, Khatil, Kendua, Dakshin Sahar, Rampur, Gannadia, Basara, Parameswarpur, Arbara, Konar, Nem (SM/07972) 36.26 36.26
19 Malda Division BENGAL ENGINEERING COMPANY Providing Functional Household Tap Connection (FHTC) in connection with Jal Jeevan Mission (JJM) under command area of Sailpur Water Supply Scheme at Englishbazar Dev. Block under Malda Division, PHE Dte. in the district of Malda. 000118ORD/000453/2023-202 ORD/000453/2023-2024 3370/MD 29/08/2023 1 7.98 Providing Functional Household Tap Connection (FHTC) in connection with Jal Jeevan Mission (JJM and JAL SWAPNA) under command area of SAILPUR Water Supply Scheme (SM/06871) 7.98 7.98
20 Malda Division MERCURY ENGINEERING COMPANY Formal work order for the work of Installation of Stand-Alone Community Purification Plant (CWPP) for AWC's at Karkach GP of Gazole Dev. Block under Malda Division, PHE Dte. 000118ORD/000454/2022-202 ORD/000454/2022-2023 116/MD 18/01/2023 1 0.65 INSTALLATION OF 85 Nos. STAND ALONE COMMUNITY PURIFICATION PLANT(CWPP) AT ANGANWADI CENTRES OF GP-ALAL,KARKACH,DEOTALA& BABUPUR IN GAZOLE DEV BLOCK ,MALDA UNDER MALDA DIVISION,PHE DTE. (SM/10307) 0.65 0.65
21 Malda Division SARANGA SARKAR Construction of 3.60 mtr.X 3.00 mtr Switch Room cum chlorine room corresponding to tubewell No 4 at Mirzapur PWSS of Bamongola Block under Malda Division, PHE Dte, Govt. of West Bengal. 000118ORD/000462/2023-202 ORD/000462/2023-2024 3395/MD 31/08/2023 1 4.12 Augmentation of Mirzapur Piped Water Supply Scheme (SM/10317) 4.12 4.12
22 Malda Division M/S DAS CONSTRUCTION Formal work order for the work of Installation of Stand-Alone Community Purification Plant (CWPP) for Schools at Chaknagar & Karkach GP of Gazole Dev. Block under Malda Division, PHE Dte. 000118ORD/000497/2022-202 ORD/000497/2022-2023 84/MD 17/01/2023 1 14.09 Installation of Stand-Alone Community Purification Plant (128 nos.) at Schools of Gazole Dev. Block, Malda under Malda Division, PHE Dte. (SM/10383) 14.09 14.09
23 Malda Division NEOGI ENTERPRISE Formal work order for the work of Installation of Stand-Alone Community Purification Plant (CWPP) for AWCs at Aktoil GP of Habibpur Dev. Block under Malda Division, PHE Dte. 000118ORD/000520/2022-202 ORD/000520/2022-2023 813/MD 20/02/2023 1 67.84 INSTALLATION OF 121 Nos. STANDALONE COMMUNITY PURIFICATION PLANTS(CWPP) AT ANGANWADI CENTRES(AWCs) OF GP-MANGALPURA,AKTOIL,HABIBPUR,BAIDYAPUR & JAJOIL IN HABIBPUR DEV BLOCK ,MALDA UNDER MALDA DIVISION,PHE DTE. (SM/10246) 67.84 67.84
24 Malda Division NABODAYA MULTIPURPOSE CO-OPERA Engagement of Chemist, Bacteriologist and Laboratory Assistant including related upkeeping works for Manikchak Sub-District Laboratory (erstwhile CDTP) under Malda Division, PHE Dte. In the district of Malda. (Period from 01/10/2023 to 31/03/2024). 000118ORD/000551/2023-202 ORD/000551/2023-2024 3722/MD 26/09/2023 1 2.84 Operational Charges of PHED & NGO Managed Laboratories Related to water quality monitoring & surveillance under Jal Jeevan Mission. (SM/12272) 2.84 2.84
25 Malda Division ENGINEERING PROJECTS (INDIA) L Formal work order for the work of Surveying, Planning, Designing, Delivery, Erection, Construction, Commissioning and Completion of all civil, electrical and mechanical works including all allied and related works of Sub- Surface Water Based Piped Water S 000118ORD/000584/2023-202 ORD/000584/2023-2024 3993/MD 06/10/2023 1 412.68 Sub Surface Water based Piped Water Supply Scheme from Tangon & Punarbhaba River for Fluoride affected areas of Bamangola Block (SM/18685) 412.68 412.68
26 Malda Division S.S.GHOSH ENTERPRISE & CO. Additional Laying Distribution of UPVC Pipe line of KARIALI ZONE-II Piped Water Supply Scheme at Harishchandrapur-II Block of Malda District under Malda Division, PHE Dte, Govt. of West Bengal. 000118ORD/000612/2023-202 ORD/000612/2023-2024 4141/MD 11/10/2023 1 2.11 Ground Water Based for Kariali Zone-II Piped Water Supply Scheme under Malda Division, PHE Dte. (SM/11589) 2.11 2.11
27 Malda Division HANNAN BUILDERS PVT. LTD. Formal work order for the work of Implementation of CHAKSUKUR Piped Water Supply at Habibpur Dev. Block in the District Malda under Malda Division, PHE Dte. Govt. of West Bengal. 000118ORD/000661/2022-202 ORD/000661/2022-2023 1035/MD 13/03/2023 1 64.99 CHAKSUKUR PIPED WATER SUPPLY SCHEME. (SM/13719) 64.99 64.99
28 Malda Division SOVAN KUMAR ROY Formal work order for the work of Construction of 600 M3 Capacity Over Head Reservoir with Soil Investigation and FHTC of GAURIA Piped Water Supply Scheme at Chanchal-I Dev. Block of Malda district under Malda Division, PHE Dte., Govt. of West Bengal. 000118ORD/000665/2022-202 ORD/000665/2022-2023 1036/MD 13/03/2023 1 53.37 GAURIA Piped Water Supply Scheme. (SM/12079) 53.37 53.37
29 Malda Division RAJIB MANI Acceptance cum formal work order for Construction of 3.60 mtr.X 3.00 mtr Switch Room cum chlorine room with Water Supply and sanitary arrangement at 2nd Tube Well site. of RAJARAMCHAK Water Supply Scheme at Gazole Block of Malda District under Malda Divi 000118ORD/000684/2022-202 ORD/000684/2022-2023 1136/MD 20/03/2023 1 4.14 RAJARAM CHAK PIPED WATER SUPPLY SCHEME (SM/14461) 4.14 4.14
30 Malda Division M/S TRILOCHAN CONSTRUCTION CO Laying of Distribution of UPVC Pipeline of SRI CHANDRAPUR Piped Water Supply Scheme at Harishchandrapur-I Block of Malda District under Malda Division, PHE Dte., Govt. of West Bengal. 000118ORD/000705/2023-202 ORD/000705/2023-2024 4634/MD 23/11/2023 1 56.6 SRI CHANDRAPUR Piped Water Supply Scheme (SM/12764) 56.6 56.6
31 Malda Division SHABNAM ARA Continuation work order for the work of Hiring of inspection Vehicle (Non-Air Condition, Bharat Stage-III on or after 01/05/2008 with Diesel/LPG/CNG Engine) in perfect good condition of performing a very long journey and should be covered anywhere without 000118ORD/000716/2023-202 ORD/000716/2023-2024 4428/MD 30/10/2023 2 0.79 Augmentation of Samsi PWSS. (SM/18447) 0.79 0.79
32 Malda Division J. M. CONSTRUCTION Providing Functional Household Tap Connection (FHTC) in connection with Jal Jeevan Mission (JJM) under command area of NIJGANPARANPUR under Araidanga Zone-II Water Supply Scheme at Ratua-II Dev. Block under Malda Division, PHE Dte. in the district of Mald 000118ORD/000723/2023-202 ORD/000723/2023-2024 4772/MD 05/12/2023 1 1.54 AUGMENTATION OF ARIADANGA PIPED WATER SUPPLY SCHEME (SM/10181) 1.54 1.54
33 Malda Division DUTTA ENTERPRISE Formal work order for Implementation of OLTARA Water Supply Scheme at Habibpur Block of Malda District under Malda Division, PHE Dte, Govt. of West Bengal. 000118ORD/000742/2022-202 ORD/000742/2022-2023 1253/MD 22/03/2023 1 73.65 OLTARA PIPED WATER SUPPLY SCHEME. (SM/13718) 73.65 73.65
34 Malda Division RAY CONSTRUCTION CO. Formal work order for Implementation of MATIHARPUR Water Supply Scheme at Chanchal-I Block of Malda District under Malda Division, PHE Dte, Govt. of West Bengal. 000118ORD/000743/2022-202 ORD/000743/2022-2023 1250/MD 22/03/2023 1 99.85 MATIHARPUR Piped Water Supply Scheme (SM/12769) 99.85 99.85
35 Malda Division M/S JHA CONSTRUCTION Additional Laying Distribution of UPVC Pipeline of Augmentation of ARAIDANGA ZONE-I Piped Water Supply Scheme at Ratua-I Block of Malda District under Malda Division, PHE Dte., Govt. of West Bengal. 000118ORD/000745/2023-202 ORD/000745/2023-2024 5248/MD 22/12/2023 1 1.69 AUGMENTATION OF ARIADANGA PIPED WATER SUPPLY SCHEME (SM/10181) 1.69 1.69
36 Malda Division CHARU CONSTRUCTION Providing Functional Household Tap Connection (FHTC) in connection with Jal Jeevan Mission (JJM) under command area of ARAIDANGA ZONE-I Water Supply Scheme at Ratua-II Dev. Block under Malda Division, PHE Dte. in the district of Malda. 000118ORD/000747/2023-202 ORD/000747/2023-2024 5249/MD 22/12/2023 1 0.68 AUGMENTATION OF ARIADANGA PIPED WATER SUPPLY SCHEME (SM/10181) 0.68 0.68
37 Malda Division A. L. ENGINEERING SOLUTION Acceptance cum formal work order for Sinking of ( 200mm. Dia. x 150mm. Dia ) Big dia Tube Well ( 250.00 Mtr. deep ) by D.R. Rig method using P.V.C. pipe including supply of Materials at Kendua Water Supply Scheme under Malda Division P.H.E Dte in the D 000118ORD/000768/2022-202 ORD/000768/2022-2023 1398/MD 28/03/2023 1 12.01 Source Augmentation of Kendua Piped Water Supply Scheme under Malda Division, PHE Dte. (SM/15106) 12.01 12.01
38 Malda Division M/S FOUR STAR CONSTRUCTION Erection of Jal Jeevan Mission Sign Board at Chanchal-II, Harishchandrapur-I, Harishchandrapur-II and Ratua-I block under RWS Malda Sub-Division in the district of Malda. 000118ORD/000813/2023-202 ORD/000813/2023-2024 154/MD 08/01/2024 1 90.47 Detailed Project Report onTraining/Capacity Building Activities for various stakeholders under Jal Jeevan Mission (JJM) Support Activities. (SM/07379) 90.47 90.47
39 Malda Division J. M. CONSTRUCTION Laying of Rising Main including Specials and Valves for Uttar Chandipur Zone-IV A Piped Water Supply Scheme at Manikchak Block of Malda District under Malda Division, PHE Dte, Govt. of West Bengal. 000118ORD/000890/2023-202 ORD/000890/2023-2024 164/MD 08/01/2024 1 8.99 Augmentation of Uttar Chandipur Zone- IV A Piped Water Supply Scheme under Malda Division, PHE Dte. (SM/15308) 8.99 8.99
40 Malda Division UTTAM KUMAR GHOSH Continuation work order for Hiring of inspection Vehicle (Non-Air-Condition, Bharat Stage-III on or after 01/05/2008 with Diesel/LPG/CNG Engine) in perfect good condition of performing a very long jurney and should be covered any where without any trouble 000118ORD/000894/2023-202 ORD/000894/2023-2024 1010/MSD 29/12/2023 1 0.4 Providing Functional Household Tap Connection (FHTC) in connection with Jal Jeevan Mission (JJM and JAL SWAPNA) under command area of different Water Supply Schemes at different Blocks under Malda Division, PHE Dte (SM/07973) 0.4 0.4
41 Malda Division LOKNATH ENTERPRISE Construction of 3.60 mtr.X 3.00 mtr Switch Room cum chlorine room corresponding to tubewell No 3 at Wari PWSS under Harischandrapur-I Block under Malda Division, PHE Dte, Govt. of West Bengal. 000118ORD/000900/2023-202 ORD/000900/2023-2024 273/MD 11/01/2024 1 4.16 WARI Piped Water Supply Scheme (SM/12077) 4.16 4.16
42 Malda Division A. L. ENGINEERING SOLUTION Sinking of ( 250 mm Dia. X 200 mm Dia.) Tubewell No.-3 (130 M deep) by D.R Rig. Method using P.V.C. pipe & Gravel Filter including Supply of materials at SANKAIL Water Supply Scheme of Habibpur Block under Malda Division, P.H.E Dte in the District of Mald 000118ORD/000920/2023-202 ORD/000920/2023-2024 381/MD 17/01/2024 1 9.77 Source Augmentation of Sankail Piped Water Supply Scheme under Malda Division, PHE Dte. (SM/12323) 9.77 9.77
43 Malda Division M/S GHOSH CONSTRUCTION Laying of Rising Main including Specials and Valves for Bamangram Piped Water Supply Scheme at Bamongola Block of Malda District under Malda Division, PHE Dte, Govt. of West Bengal. 000118ORD/000958/2023-202 ORD/000958/2023-2024 706/MD 09/02/2024 1 5.9 Augmentation of Bamongram piped water supply scheme. (SM/10138) 5.9 5.9
44 Malda Division RATAN KARMAKAR Additional Laying Distribution of UPVC pipe line of NABAGRAM Piped Water Supply Scheme at Chanchal-I Dev. Block under Malda Division, P.H.E Dte. 000118ORD/000959/2023-202 ORD/000959/2023-2024 710/MD 09/02/2024 1 3.86 NABAGRAM Piped Water Supply Scheme (SM/12767) 3.86 3.86
45 Malda Division RAJENDRA PRASAD SINGH Hiring of inspection Vehicle (Non-Air Condition, Bharat Stage-III on or after 01/05/2008 with Diesel/LPG/CNG Engine) in perfect good condition of performing a very long journey and should be covered anywhere without any trouble on monthly hire basis for O 000118ORD/000993/2023-202 ORD/000993/2023-2024 843/MD 22/02/2024 1 0.4 Providing Functional Household Tap Connection (FHTC) in connection with Jal Jeevan Mission (JJM and JAL SWAPNA) under command area of different Water Supply Schemes at different Blocks under Malda Division, PHE Dte (SM/07973) 0.4 0.4
46 Malda Division RAHANUL ALAM Erection of Jal Jeevan Mission Sign Board at Retrofitting Schemes of Chanchal-I & Harishchandrapur-I Block under RWS Malda Sub-Division in the district of Malda. 000118ORD/001039/2023-202 ORD/001039/2023-2024 892/MD 28/02/2024 1 0.85 Providing Functional Household Tap Connection (FHTC) in connection with Jal Jeevan Mission (JJM and JAL SWAPNA) under command area of different Water Supply Schemes at different Blocks under Malda Division, PHE Dte (SM/07973) 0.85 0.85
47 Malda Division RAHANUL ALAM Erection of Jal Jeevan Mission Sign Board at Retrofitting Schemes of Harishchandrapur-II Block under RWS Malda Sub-Division in the district of Malda. 000118ORD/001048/2023-202 ORD/001048/2023-2024 901/MD 28/02/2024 1 0.96 Providing Functional Household Tap Connection (FHTC) in connection with Jal Jeevan Mission (JJM and JAL SWAPNA) under command area of different Water Supply Schemes at different Blocks under Malda Division, PHE Dte (SM/07973) 0.96 0.96
48 Malda Division RAHANUL ALAM Erection of Jal Jeevan Mission Sign Board at different CWPP sites of Chanchal-I, Harishchandrapur-I & Harishchandrapur-II Block under RWS Malda Sub-Division in the district of Malda. 000118ORD/001053/2023-202 ORD/001053/2023-2024 906/MD 28/02/2024 1 0.72 Providing Functional Household Tap Connection (FHTC) in connection with Jal Jeevan Mission (JJM and JAL SWAPNA) under command area of different Water Supply Schemes at different Blocks under Malda Division, PHE Dte (SM/07973) 0.72 0.72
49 Malda Division PABITRA MANDAL Supply, installation, commissioning and trial operation of electro-mechanical components of Augmentation for T/W No.- III of Bulbulchandi Water Supply Scheme in the District of Malda under Malda Mechanical Division, PHE Dte. (TSM/008161) 000118ORD/001099/2022-202 ORD/001099/2022-2023 596/MLMD 30/03/2023 1 1.41 Augmentation of Bulbulchandi PWSS. (SM/09422) 1.41 1.41
50 Malda Division USHA ENTERPRISE Continuation work order for Hiring of 1 no diesel vehicle in good condition (traffic worthily) having licensed contract carriage permit from Regional Transport Authority for office of the Superintending Engineer, North Bengal Circle-II, PHE Dte. (Period f 000118ORD/001161/2023-202 ORD/001161/2023-2024 5151/MD 21/12/2023 1 0.39 Providing Functional Household Tap Connection in connection with Jal Jeevan Mission (JJM and JAL SWAPNA) under command area of Bahirgachhi, Purba Binodpur, Sankail, Khatil, Kendua, Dakshin Sahar, Rampur, Gannadia, Basara, Parameswarpur, Arbara, Konar, Nem (SM/07972) 0.39 0.39
51 Malda Division SHABNAM ARA Continuation work order for the work of Hiring of inspection Vehicle (Non-Air Condition, Bharat Stage-III on or after 01/05/2008 with Diesel/LPG/CNG Engine) in perfect good condition of performing a very long journey and should be covered anywhere without 000118ORD/001218/2023-202 ORD/001218/2023-2024 1440/MD 15/03/2024 2 0.79 AUMENTATION OF AIHO ZONE-II PIPED WATER SUPPLY SCHEME (SM/15188) 0.79 0.79
Total 53 1,742.93 # 1,742.93 1,742.93