1 |
Neorakhola W/S Mnt. Division |
WBSEDCL |
Quotation as per WBSEDCL procedure-A (2010) on Turn-Key/ Full Deposit Basis
supply office : Pedong CCC
Supply office address: Kalimpong |
000110 |
|
4003556256 |
18/12/2024 |
5 |
37.61 |
PROPOSED PUMPING BASED PIPED WATER SUPPLY SCHEME FOR MARIA KHASMAHAL (PART) (UPPER RABEK) UNDER KAGAY G.P, BLOCK : KALIMPONG - II, DISTRICT:KALIMPONG (SM/13616) |
36.7 |
36.7 |
2 |
Neorakhola W/S Mnt. Division |
YAMA CONSTRUCTIONS LLP |
Hiring of vehicle for the office of Executive Engineer, Neorakhola Water Supply and Maintenance Division Public Health Engineering Directorate for the period from July 2024 to December 2024. |
000110ORD/000044/2024-202 |
ORD/000044/2024-2025 |
1205/NKWSM |
10/07/2024 |
2 |
0.78 |
RIYONG FOREST & RIYANG RAILWAY STATION PIPED WATER SUPPLY SCHEME UNDER TEESTA G.P, BLOCK:-KALIMPONG-I, P.S:-KALIMPONG, DISTRICT:KALIMPONG. (SM/11376) |
0.78 |
0.78 |