1 |
Neorakhola W/S Mnt. Division |
WBSEDCL |
Pumping based Piped water supply scheme for Turzum Forest under Teesta G.P. Kalimpong Block- I District Kalimpong. |
000110 |
|
4003424527 |
05/06/2024 |
5 |
23.31 |
PROPOSED PUMPING BASED PIPED WATER SUPPLY SCHEME FOR TURZUM FOREST UNDER TEESTA G.P, BLOCK : KALIMPONG - I, DISTRICT:KALIMPONG (SM/13621) |
22.39 |
22.39 |
2 |
Neorakhola W/S Mnt. Division |
JUSTINE BHUTIA |
Replacement of existing RCC bridge locally known as OLD English Bridge Bridge No 70 with New Steel bridge of 20m Span in between chain no-129 to 130 Span resting over concrete abutment on both the sides including construction of slope protection works f |
000110ORD/000005/2022-202 |
ORD/000005/2022-2023 |
104/NKWSMD |
13/04/2022 |
1 |
50 |
Augmentation of Neorakhola Water Supply Scheme for extending FHTC Facility to the enroute habitations under Kalimpong Block-I & Block-II under Neorakhola W/S & Mtc Division ,PHE Dte., Kalimpong (SM/10052) |
43.61 |
43.61 |
3 |
Neorakhola W/S Mnt. Division |
THUPDEN BHUTIA |
Replacement of 4 nos Damaged Steel Bridge with 3 nos New Steel bridge of 15m span in between ch no-119-120 (Bridge no-58), steel bridge 10m span chain no ¿ 144 (Bridge no-69) new tubular Steel bridge of 10m span in between ch no-95 (Bridge no-61) and c |
000110ORD/000006/2022-202 |
ORD/000006/2022-2023 |
105/NKWSMD |
13/04/2022 |
1 |
87.26 |
Augmentation of Neorakhola Water Supply Scheme for extending FHTC Facility to the enroute habitations under Kalimpong Block-I & Block-II under Neorakhola W/S & Mtc Division ,PHE Dte., Kalimpong (SM/10052) |
27.64 |
27.64 |
4 |
Neorakhola W/S Mnt. Division |
DENDUP BHUTIA AND COMPANY |
WATER SUPPLY SCHEME FOR MAJUA TEA GARDEN PIPED WATER SUPPLY SCHEME IN DARJEELING PULBAZAR BLOCK UNDER DARJEELING DISTRICT. |
000110ORD/000025/2023-202 |
ORD/000025/2023-2024 |
124/NKWSMD |
28/04/2023 |
1 |
91.68 |
MAJUA PIPED WATER SUPPLY SCHEME. (SM/15874) |
85.78 |
85.78 |
5 |
Neorakhola W/S Mnt. Division |
SRINIWAS AGARWAL |
WATER SUPPLY SCHEME FOR JUNGPANA TEA GARDEN PIPED WATER SUPPLY SCHEME IN KURSEONG BLOCK UNDER DARJEELING DISTRICT. |
000110ORD/000029/2023-202 |
ORD/000029/2023-2024 |
107/NKWSMD |
28/04/2023 |
1 |
51.3 |
PIPED WATER SUPPLY SCHEME FOR JUNGPANA TEA GARDEN,IN KURSEONG BLOCK UNDER DARJEELING DISTRICT. (SM/16352) |
38.29 |
38.29 |
6 |
Neorakhola W/S Mnt. Division |
GREEN VALLEY CONSTRUCTION |
WATER SUPPLY SCHEME FOR CHEGRA KHASMAHAL PIPED WATER SUPPLY SCHEME IN RANGLI RANGLIOT BLOCK UNDER DARJEELING DISTRICT. |
000110ORD/000034/2023-202 |
ORD/000034/2023-2024 |
184/NKWSMD |
04/05/2023 |
1 |
106.69 |
CHEGRA KHASMAHAL Piped Water Supply Scheme (SM/16141) |
101.58 |
101.58 |
7 |
Neorakhola W/S Mnt. Division |
GREENPRO ENGINEERING |
WATER SUPPLY SCHEME FOR OKAITY TEA GARDEN PIPED WATER SUPPLY SCHEME IN MIRIK BLOCK UNDER DARJEELING DISTRICT. |
000110ORD/000036/2023-202 |
ORD/000036/2023-2024 |
185/NKWSMD |
04/05/2023 |
1 |
375.02 |
WATER SUPPLY SCHEME FOR OKATIY TEA GARDEN PWSS IN MIRIK BLOCK UNDER DARJEELING DISTRICT. (SM/16532) |
279.3 |
279.3 |
8 |
Neorakhola W/S Mnt. Division |
SRINIWAS AGARWAL |
PROPOSED GRAVITY BASED & PUMPING BASED PIPED WATER SUPPLY SCHEME FOR GITBEONG KHASMAHAL UNDER LAVA GITBEONG G.P, BLOCK : KALIMPONG - II, DISTRICT : KALIMPONG. |
000110ORD/000037/2023-202 |
ORD/000037/2023-2024 |
220/NKWSMD |
10/05/2023 |
1 |
388.36 |
PROPOSED GRAVITY BASED & PUMPING BASED PIPED WATER SUPPLY SCHEME FOR GITBEONG KHASMAHAL UNDER LAVA GITBEONG G.P, BLOCK : KALIMPONG-II DISTRICT:KALIMPONG (SM/15645) |
379.6 |
379.6 |
9 |
Neorakhola W/S Mnt. Division |
RAMESH AGARWAL |
Water Supply Scheme for Pubong Khasmahal Piped Water Supply Scheme In Rangli Rangliot Block Under Darjeeling District. |
000110ORD/000056/2023-202 |
ORD/000056/2023-2024 |
411/NKWSMD |
05/06/2023 |
1 |
38.69 |
PUBONG KHASHMAHAL PIPED WATER SUPPLY SCHEME (SM/15897) |
11.49 |
11.49 |
10 |
Neorakhola W/S Mnt. Division |
SAMSHER RAI |
P.W.S SCHEME FROM ARDHALI JHORA TO TINKATAREY, CHAPLATEY, BARAL, GURDAY GAON KUMAI G.P GORUBATHAN BLOCK, KALIMPONG UNDER JAL JEEVAN MISSION AND JAL SWAPNO PROGRAMME. |
000110ORD/000064/2021-202 |
ORD/000064/2021-2022 |
455/NKWSMD |
14/01/2022 |
1 |
51.9 |
PWS SCHEME FROM ARDHALI JHORA TO TINKATAREY, CHAPLATEY, BARAL, GURDAY GAON (SM/09668) |
48.13 |
48.13 |
11 |
Neorakhola W/S Mnt. Division |
ANAND MANI PRADHAN |
P.W.S. Scheme from Mali khola to Kasmi Forest Village under Bong G.P. Block I, Kalimpong under Jal Jeevan Mission and Jal Swapno Programme |
000110ORD/000066/2021-202 |
ORD/000066/2021-2022 |
457/NKWSMD |
14/01/2022 |
1 |
14.82 |
PWSS FROM MALI KHOLA TO KASHMI FOREST VILLAGE (SM/09617) |
6 |
6 |
12 |
Neorakhola W/S Mnt. Division |
YAMA CONSTRUCTIONS LLP |
WATER SUPPLY SCHEME FOR BUKIM TEA GARDEN PIPED WATER SUPPLY SCHEME IN MIRIK BLOCK UNDER DARJEELING DISTRICT. |
000110ORD/000074/2023-202 |
ORD/000074/2023-2024 |
675/NKWSMD |
12/07/2023 |
1 |
259.64 |
PIPED WATER SUPPLY SCHEME FOR BUKIM TEA GARDEN IN MIRIK BLOCK UNDER DARJEELING DISTRICT. (SM/14529) |
194.73 |
194.73 |
13 |
Neorakhola W/S Mnt. Division |
NARAYAN THAPA |
SURFACE WATER BASED RONG TONG 12 MILE PWSS TO ACCMMODATE FHTC IN KURSEONG BLOCK WITHIN DARJEELING DISTRICT UNDER KURSEONG DIVISION, PHE DTE. |
000110ORD/000077/2022-202 |
ORD/000077/2022-2023 |
600/NKWSMD |
26/05/2022 |
1 |
35.83 |
PWSS Scheme for Rong Tong 12 Mile under Kurseong Sub Division ,PHED,GTA (SM/10810) |
26.18 |
26.18 |
14 |
Neorakhola W/S Mnt. Division |
HIMALI CONSTRUCTION COMPANY |
SURFACE WATER BASED KOPCHI GAON PWSS TO ACCMMODATE FHTC IN KURSEONG BLOCK WITHIN DARJEELING DISTRICT UNDER KURSEONG DIVISION, PHE DTE. |
000110ORD/000078/2022-202 |
ORD/000078/2022-2023 |
601/NKWSMD |
26/05/2022 |
1 |
16.58 |
PWSS Scheme for Kopchey Gaon under Kurseong Sub Division ,PHED,GTA (SM/10799) |
11.02 |
11.02 |
15 |
Neorakhola W/S Mnt. Division |
ROSHAN BISWAKARMA |
SURFACE WATER BASED MARCHEBUNG PIPED WATER SUPPLY SCHEME TO ACCMMODATE FHTC IN KURSEONG BLOCK WITHIN DARJEELING DISTRICT UNDER KURSEONG DIVISION, PHED-GTA. |
000110ORD/000079/2022-202 |
ORD/000079/2022-2023 |
602/NKWSMD |
26/05/2022 |
1 |
25.69 |
PWSS Scheme for Marchebung under Kurseong Sub Division ,PHED,GTA (SM/10803) |
13.65 |
13.65 |
16 |
Neorakhola W/S Mnt. Division |
NEOCON CONSTRUCTION CO |
GRAVITY BASED PIPED WATER SUPPLY SCHEME FOR KAGEY KHASMAHAL PIPED WATER SUPPLY SCHEME, UNDER KAGEY G.P BLOCK : KALIMPONG-II, DISTRICT: KALIMPONG. |
000110ORD/000079/2023-202 |
ORD/000079/2023-2024 |
678/NKWSMD |
12/07/2023 |
1 |
76.96 |
GRAVITY BASED PIPED WATER SUPPLY SCHEME FOR KAGEY KHASMAHAL (PART) UNDER KAGEY G.P, BLOCK : KALIMPONG II, DISTRICT:KALIMPONG (SM/16235) |
69.36 |
69.36 |
17 |
Neorakhola W/S Mnt. Division |
KARUNAMAYA ENTERPRISES |
SURFACE WATER BASED TINDHARIA TEA ESTATE PWSS TO ACCMMODATE FHTC IN KURSEONG BLOCK WITHIN DARJEELING DISTRICT UNDER KURSEONG DIVISION, PHE DTE. |
000110ORD/000081/2022-202 |
ORD/000081/2022-2023 |
604/NKWSMD |
26/05/2022 |
1 |
46.99 |
PWSS Scheme for Tindharia Tea Estate under Kurseong Sub Division ,PHED,GTA (SM/10808) |
43 |
43 |
18 |
Neorakhola W/S Mnt. Division |
NARESH RAI |
SURFACE WATER BASED LOWER CHISOPANI PWSS TO ACCMMODATE FHTC IN KURSEONG BLOCK WITHIN DARJEELING DISTRICT UNDER KURSEONG DIVISION, PHE DTE. |
000110ORD/000083/2022-202 |
ORD/000083/2022-2023 |
606/NKWSMD |
26/05/2022 |
1 |
19.24 |
PWSS Scheme for Lower Chisopani under Kurseong Sub Division ,PHED,GTA (SM/10806) |
13.34 |
13.34 |
19 |
Neorakhola W/S Mnt. Division |
RAMESH AGARWAL |
WATER SUPPLY SCHEME FOR PUMONG TEA GARDEN PIPED WATER SUPPLY SCHEME RANGLI RANGLIOT BLOCK UNDER DARJEELING DISTRICT. |
000110ORD/000083/2023-202 |
ORD/000083/2023-2024 |
682/NKWSMD |
12/07/2023 |
1 |
28.89 |
PUMONG TEA GARDEN PIPED WATER SUPPLY SCHEME. (SM/15876) |
12.59 |
12.59 |
20 |
Neorakhola W/S Mnt. Division |
M/S S S CONSTRUCTION |
WATER SUPPLY SCHEME FOR SIMRING TEA GARDEN PIPED WATER SUPPLY SCHEME IN BLOCK KURSEONG UNDER DISTRICT DARJEELING. |
000110ORD/000084/2023-202 |
ORD/000084/2023-2024 |
683/NKWSMD |
12/07/2023 |
1 |
59.43 |
PIPED WATER SUPPLY SCHEME FOR SIMRING TEA GARDEN IN KURSEONG BLOCK UNDER DARJEELING DISTRICT. (SM/16145) |
10 |
10 |
21 |
Neorakhola W/S Mnt. Division |
KAMAKHYA ENTERPRISES |
PIPED WATER SUPPLY SCHEME FOR 4th DIVISION: PHUBTSHERING TEA GARDEN UNDER JAL SWAPNO PROGRAMME. |
000110ORD/000087/2022-202 |
ORD/000087/2022-2023 |
614/NKWSMD |
26/05/2022 |
1 |
54.3 |
Piped water supply scheme for No-4 Division , Phubtshering Tea Garden (SM/10837) |
38.79 |
38.79 |
22 |
Neorakhola W/S Mnt. Division |
M/S KAMAK ENGINEERS AND CO. |
Implementation Of ODEX Tube Well based 02(Two) number of pipe water supply Scheme having provision of 2(Two) number of RCC OHR viz 300 Cum & 200Cum and other related works for 6(Six) villages in GTA Area. |
000110ORD/000094/2022-202 |
ORD/000094/2022-2023 |
825/NKWSMD |
30/06/2022 |
1 |
133.93 |
BARA CHENGA PIPED WATER SUPPLY SCHEME (SM/10816) |
132 |
132 |
23 |
Neorakhola W/S Mnt. Division |
NIM TSHERING LEPCHA |
Providing piped water Supply Scheme for Household in Middle & Lower Dabling, Gitdabling Khasmahal l (Part), Gitdabling G.P under Kalimpong Block -II in the District of Kalimpong in connection with Jal Jeevan Mission, under Neorakhola Water Supply and Main |
000110ORD/000107/2023-202 |
ORD/000107/2023-2024 |
821/NKWSMD |
24/07/2023 |
1 |
40.58 |
Providing piped water Supply Scheme for Fourteen 14 Nos of villages (part) under Kalimpong Block-I & Kalimpong Block-II in the district of Kalimpong under Neorakhola water Supply & Maintenance Division PHE Dte. (SM/18443) |
30.09 |
30.09 |
24 |
Neorakhola W/S Mnt. Division |
MS. SURYA I PVT. LTD COMPANY |
Providing piped water SupplyScheme for Household in Jhandi Rai Goan, Chhetri Goan, Budrathoki Goan, Upper Suntalay, lower Suntalay, & Tunglabong in Pokhrabong khasmahal (Part), Pokhrabong G.P under Kalimpong Block-II in the District of Kalimpong in connec |
000110ORD/000109/2023-202 |
ORD/000109/2023-2024 |
823/NKWSMD |
24/07/2023 |
1 |
103.55 |
Providing piped water Supply Scheme for Fourteen 14 Nos of villages (part) under Kalimpong Block-I & Kalimpong Block-II in the district of Kalimpong under Neorakhola water Supply & Maintenance Division PHE Dte. (SM/18443) |
85.52 |
85.52 |
25 |
Neorakhola W/S Mnt. Division |
BIKASH TAMANG |
Providing Functional household Tap connection under Jal Jeevan Mission & JSP Programme including Retrofitting work for PWS scheme for Cricket Bazar Tindharay Mahanadi GP Block - Kurseong Block. |
000110ORD/000115/2022-202 |
ORD/000115/2022-2023 |
795/NKWSMD |
30/06/2022 |
1 |
12.55 |
Providing Functional Household Tap Connection under Jal Jeevan Mission and Jal Swapno Programme for Piped Water Supply Scheme for Cricket Bazar under Kurseong Sub-Division, PHED, GTA (SM/11327) |
12.22 |
12.22 |
26 |
Neorakhola W/S Mnt. Division |
HIMALI CONSTRUCTION COMPANY |
Providing Functional household Tap connection under JJM & JSP Programme including Retrofitting work for PWS scheme for Seepoydhura T.E. Mahanadi GP Block - Kurseong Block. |
000110ORD/000133/2022-202 |
ORD/000133/2022-2023 |
813/NKWSMD |
30/06/2022 |
1 |
22.96 |
Providing Functional Household Tap Connection under Jal Jeevan Mission and Jal Swapno Programme for Piped Water Supply Scheme for Sepoydhura Tea Estate under Kurseong-Sub Division, PHED, GTA (SM/11334) |
16.93 |
16.93 |
27 |
Neorakhola W/S Mnt. Division |
BIKRAM RAI |
Piped Water Supply Scheme for Lower Lonku under Kurseong Sub-Division, P.H.E.D. GTA. |
000110ORD/000140/2022-202 |
ORD/000140/2022-2023 |
831/NKWSMD |
30/06/2022 |
1 |
31.1 |
PWSS Scheme for Lower Lonku under Kurseong Sub Division ,PHED,GTA (SM/10828) |
5 |
5 |
28 |
Neorakhola W/S Mnt. Division |
M/S BALAJI CONSTRUCTIONS |
WATER SUPPLY SCHEME FOR SEYOK TEA GARDEN PIPED WATER SUPPLY SCHEME IN JOREBUNGLOW-SUKIAPOKHRI BLOCK UNDER DARJEELING DISTRICT. |
000110ORD/000158/2023-202 |
ORD/000158/2023-2024 |
892/NKWSMD |
07/08/2023 |
1 |
309.19 |
WATER SUPPLY SCHEME FOR SEYOK TEA GARDEN PWSS,IN JOREBUNGLOW SUKIAPOKHRI BLOCK UNDER DARJEELING DISTRICT. (SM/18634) |
247.48 |
247.48 |
29 |
Neorakhola W/S Mnt. Division |
AROGYA ENTERPRISES |
SURFACE WATER BASED NORTH & SOUTH SHIBKHOLA TEA GARDEN PIPED WATER SUPPLY SCHEME TO ACCOMODATE FHTC IN KURSEONG BLOCK.
|
000110ORD/000162/2023-202 |
ORD/000162/2023-2024 |
910/NKWSMD |
11/08/2023 |
1 |
172.23 |
PWS Scheme for North & South Tea Garden with FHTC under JJM/JSP. (SM/18638) |
171.39 |
171.39 |
30 |
Neorakhola W/S Mnt. Division |
KAMAL PRADHAN |
Providing Functional Household Tap Connection under Jal Jeevan Mission and Jal Swapno Programme for PWS Scheme at Bungkulung G.P - Dhuptin, Block-Mirik. |
000110ORD/000164/2022-202 |
ORD/000164/2022-2023 |
940 /NKWSM |
12/07/2022 |
1 |
27.82 |
Providing functional household tap connection existing PWSS at Bunkulung (SM/11391) |
20.87 |
20.87 |
31 |
Neorakhola W/S Mnt. Division |
SUVASH RAI |
Providing Functional Household Tap Connection under Jal Jeevan Mission and Jal Swapno Programme for PWS Scheme at Bhir Gaon & Dhar Gaon Gram, GP - Majua, Block - Bijanbari Pulbazar. |
000110ORD/000168/2022-202 |
ORD/000168/2022-2023 |
944/NKWSMD |
12/07/2022 |
1 |
11.92 |
Providing functional household tap connection for balance household under Jal Jeewan Mission/Jal Swapno Programme at Vir Goan & Dhar Goan. (SM/11385) |
5.5 |
5.5 |
32 |
Neorakhola W/S Mnt. Division |
NAVRATNA CONSTRUCTION CO |
Providing Functional Household Tap Connection under Jal Jeevan Mission and Jal Swapno Programme for Piped Water Supply Scheme at Takdah Bazar GP - Takdah Block - Rungli Rungliot. |
000110ORD/000174/2022-202 |
ORD/000174/2022-2023 |
950/NKWSMD |
12/07/2022 |
1 |
112.6 |
Providing Functional Household tap connection under Jal Jeewan Mission / Jal Swapno Programme from existing scheme at Takdah Bazar (SM/11392) |
106.56 |
106.56 |
33 |
Neorakhola W/S Mnt. Division |
MS. SURYA I PVT. LTD COMPANY |
PWS Scheme at Sittong - III Naspatti Gaon with Functional Household tap connection under Jal Jeevan Mission & Jal Swapno Programme under Kurseong Division PHED, GTA, Darjeeling. |
000110ORD/000177/2022-202 |
ORD/000177/2022-2023 |
953/NKWSMD |
12/07/2022 |
1 |
34.35 |
Piped Water Supply Scheme at Sittong III Naspatti Gaon with Functional Household Tap Connection under Jal Jeevan Mission under Kurseong Sub Division PHED GTA Darjeeling. (SM/11353) |
32.21 |
32.21 |
34 |
Neorakhola W/S Mnt. Division |
LAL BAHADUR THAPA |
PWS Scheme at Aringalae with Functional Household tap connection under Jal Jeevan Mission & Jal Swapno Programme under Kurseong Division PHED, GTA, Darjeeling. |
000110ORD/000179/2022-202 |
ORD/000179/2022-2023 |
955/NKWSMD |
12/07/2022 |
1 |
14.06 |
Piped Water Supply Scheme at Aringalee with Functional Household Tap Connection under Jal Jeevan Mission Programme under Kurseong Sub Division ,PHED,GTA, Darjeeling. (SM/11344) |
13.02 |
13.02 |
35 |
Neorakhola W/S Mnt. Division |
RAMESH THAPA |
PWS Scheme at Forest Busty, Latpunchor, Sittong - III with Functional Household tap connection under Jal Jeevan Mission & Jal Swapno Programme under Kurseong Division PHED, GTA, Darjeeling. |
000110ORD/000180/2022-202 |
ORD/000180/2022-2023 |
956/NKWSMD |
12/07/2022 |
1 |
13.9 |
Piped Water Supply Scheme at Forest Busty,Latpanchor Sittong III GP with Functional Household Tap Connection under Jal Jeevan Mission under Kurseong Sub Division, PHED, GTA, Darjeeling. (SM/11345) |
12.92 |
12.92 |
36 |
Neorakhola W/S Mnt. Division |
M/S. ASHOK KUMAR PERIWAL |
NIM & PHASINTING KHASMAHAL SPRING WATER SUPPLY SCHEME, UNDER BLOCK:- GORUBATHAN. DISTRICT:- KALIMPONG
|
000110ORD/000181/2023-202 |
ORD/000181/2023-2024 |
945/NKWSMD |
17/08/2023 |
1 |
340.04 |
NIM KHASMAHAL & PHASINTING KHASMAL PWSS (SM/18415) |
306.22 |
306.22 |
37 |
Neorakhola W/S Mnt. Division |
NABIN RAI |
PWS Scheme at Milan Dhura, Latpunchor, Sittong - III with Functional Household tap connection under Jal Jeevan Mission & Jal Swapno Programme under Kurseong Division PHED, GTA, Darjeeling. |
000110ORD/000182/2022-202 |
ORD/000182/2022-2023 |
958/NKWSMD |
12/07/2022 |
1 |
14.31 |
Piped Water Supply Scheme at Milan Dhura Latpanchor Sittong III GP with Functional Household Tap Connection under Jal Jeevan Mission and Jal Swapno Programme under Kurseong Sub Division ,PHED,GTA, Darjeeling. (SM/11346) |
13.35 |
13.35 |
38 |
Neorakhola W/S Mnt. Division |
THUPDEN BHUTIA |
SURFACE WATER BASED PARINGAR KHAS MAHAL PWS SCHEME TO ACCOMMODATE FHTC IN KALIMPONG-I BLOCK WITHIN KALIMPONG DISTRICT UNDER NEORAKHOLA W/S & Mtc DIVISION, PHE DTE. |
000110ORD/000187/2022-202 |
ORD/000187/2022-2023 |
962/NKWSMD |
12/07/2022 |
1 |
117.02 |
SURFACE WATER BASED PARINAGAR KHASMAHAL PWSS TO ACCOMMODATE FHTC IN KALIMPONG-I BLOCK WITHIN KALIMPONG DISTRICT UNDER NEORAKHOKA W/S & MTC. DIVISION, PHE DTE. (SM/11313) |
87.62 |
87.62 |
39 |
Neorakhola W/S Mnt. Division |
VINAYAK CONSTRUCTION |
WATER SUPPLY SCHEME FOR DAWAIPANI & TUKDAH TEA GARDEN PIPED WATER SUPPLY SCHEME IN RANGLI RANGLIOT BLOCK UNDER DARJEELING DISTRICT. |
000110ORD/000191/2023-202 |
ORD/000191/2023-2024 |
988/NKWSMD |
23/08/2023 |
1 |
249.57 |
DAWAIPANI & TUKDAH TEA GARDEN PWSS (SM/18752) |
235.69 |
235.69 |
40 |
Neorakhola W/S Mnt. Division |
MOHAN MUKHIA |
Additional Work for Providing FHTC under Jal Jeevan Mission for balance Household at Maneybhanjang Forest Village Gram Panchayat: Sukhia Simana Block: Jorebunglow Sukhiapokhri. |
000110ORD/000200/2023-202 |
ORD/000200/2023-2024 |
1082/NKWSM |
19/09/2023 |
1 |
47.41 |
GRAVITY BASED WATER SUPPLY SCHEME FOR SUKHIYAPOKHRI PWSS (SM/11855) |
45.23 |
45.23 |
41 |
Neorakhola W/S Mnt. Division |
VINAYAK CONSTRUCTION |
WATER SUPPLY SCHEME FOR KALEJ VALLEY PIPED WATER SUPPLY SCHEME IN JOREBUNGLOW SUKIAPOKHRI BLOCK UNDER DARJEELING
DISTRICT. |
000110ORD/000202/2023-202 |
ORD/000202/2023-2024 |
1100/NKWSM |
21/09/2023 |
1 |
425.25 |
GRAVITY BASED WATER SUPPLY SCHEME FOR KALEJ VALLEY PWSS, BLOCK : JORE BUNGALOW-SUKHIAPOKHRI - I, DISTRICT : DARJEELING (SM/18820) |
247.29 |
247.29 |
42 |
Neorakhola W/S Mnt. Division |
M/S. ASHOK KUMAR PERIWAL |
Piped Water Supply Scheme with FHTC for Ringtong Tea Garden (Balason) under Kurseong Division, P.H.E.D-GTA (ZONE-I) (MARGARET HOPE) |
000110ORD/000218/2023-202 |
ORD/000218/2023-2024 |
1207/NKWSM |
10/10/2023 |
1 |
234.83 |
PIPED WATER SUPPLY SCHEME WITH FHTC FOR RING TONG TEA GARDEN (MARGARET HOPE), PART OF RING TONG TEA GARDEN (GUNAWAR) & NAHORI TEA GARDEN (BALASON) (SM/18730) |
219.35 |
219.35 |
43 |
Neorakhola W/S Mnt. Division |
M/S. ASHOK KUMAR PERIWAL |
Piped Water Supply Scheme with FHTC for Ringtong Tea Garden (Margaret Hope), Part of Ringtong Tea Garden (Gunawar) & Nahori Tea Garden (Balason) under Kurseong Division, P.H.E.D-GTA (ZONE-II) (MARGARET HOPE) |
000110ORD/000224/2023-202 |
ORD/000224/2023-2024 |
1286/NKWSM |
17/10/2023 |
1 |
162.79 |
PIPED WATER SUPPLY SCHEME WITH FHTC FOR RING TONG TEA GARDEN (MARGARET HOPE), PART OF RING TONG TEA GARDEN (GUNAWAR) & NAHORI TEA GARDEN (BALASON) (SM/18730) |
74.11 |
74.11 |
44 |
Neorakhola W/S Mnt. Division |
TIKARAM SHARMA |
Piped Water Supply Scheme with FHTC for Ringtong Tea Garden (Margaret Hope), Part of Ringtong Tea Garden (Gunawar) & Nahori Tea Garden (Balason) under Kurseong Division, P.H.E.D-GTA (ZONE-III) |
000110ORD/000225/2023-202 |
ORD/000225/2023-2024 |
1287/NKWSM |
17/10/2023 |
1 |
242.35 |
PIPED WATER SUPPLY SCHEME WITH FHTC FOR RING TONG TEA GARDEN (MARGARET HOPE), PART OF RING TONG TEA GARDEN (GUNAWAR) & NAHORI TEA GARDEN (BALASON) (SM/18730) |
81.09 |
81.09 |
45 |
Neorakhola W/S Mnt. Division |
INTERIOR'S NEST |
Ground Water Reservoir of 20 ML At Sepoydhura Near Woodcut Under Kurseong Division, P.H.E.D-GTA. |
000110ORD/000227/2023-202 |
ORD/000227/2023-2024 |
1288/NKWSM |
17/10/2023 |
1 |
146.94 |
SOURCE AND CONSTRUCTION OF OPEN GROUND WATER RESERVOIR OF CAPACITY 20 ML AT SEPOYDHURA (NEAR WOODCOT) UNDER KURESONG BLOCK WITHIN DARJEEING DISTRICT UNDER KURSEONG DIVISION, DTE. (SM/18723) |
143.28 |
143.28 |
46 |
Neorakhola W/S Mnt. Division |
DINESH SHERPA |
P.W.S SCHEME FROM HARESAY JHORA TO LOWER MUNSI DHURA AND KARBUTAR UNDER SANGSAY G.P. UNDER KALIMPONG BLOCK-II, DIST. KALIMPONG. |
000110ORD/000228/2022-202 |
ORD/000228/2022-2023 |
1357/NKWSM |
21/09/2022 |
1 |
58.84 |
PWS SCHEME FROM HARESAY JHORA TO MUNSI DHURA and KARBUTAR (SM/11354) |
54.54 |
54.54 |
47 |
Neorakhola W/S Mnt. Division |
GARGO TRADERS |
GRAVITY BASED WATER SUPPLY SCHEME FOR SOOLBONG TEA GARDEN PWSS IN JOREBUNGLOW SUKIAPAKHRI BLOCK UNDER DARGEELING DISTRICT. |
000110ORD/000232/2022-202 |
ORD/000232/2022-2023 |
1146/NKWSM |
29/09/2022 |
1 |
112.95 |
GRAVITY BASED WATER SUPPLY SCHEME FOR SOOLBONG TEA GARDEN PWSS, BLOCK : JORE BUNGALOW-SUKHIAPOKHRI , DISTRICT : DARJEELING (SM/11891) |
40 |
40 |
48 |
Neorakhola W/S Mnt. Division |
SHAKTI CONSTRUCTION |
Surface water based Toryak Khasmahal Piped Water Supply Scheme to accommodate FHTC in Kurseong Block within Darjeeling District |
000110ORD/000233/2023-202 |
ORD/000233/2023-2024 |
1328/NKWSM |
03/11/2023 |
1 |
228.19 |
PWS Scheme for Toryak Khasmahal under Kurseong Sub - Division, PHED, GTA. (SM/19033) |
213.28 |
213.28 |
49 |
Neorakhola W/S Mnt. Division |
TAJ CONSTRUCTION |
Augmentation of source cum creation of spring water storage of 80 ML water by improvement of and upgradation of Open Ground Reservoir / Lake at 3.2 Km from Algarah and other allied works to cover the uncovered areas of Kalimpong Block-I & Kalimpong Block- |
000110ORD/000238/2023-202 |
ORD/000238/2023-2024 |
1501/NKWSM |
06/12/2023 |
1 |
516.8 |
Augmentation of source cum creation of spring water storage of 80 ML water by improvement of and upgradation of Open Ground Reservoir /Lake at 3.2 Km from Algarah and other allied works to cover the uncovered areas of Kalimpong Block-I & Kalimpong Block-I (SM/18442) |
456.61 |
456.61 |
50 |
Neorakhola W/S Mnt. Division |
NIMA SHERPA |
Additional work for Piped water supply scheme for Rimbick & Namla under Darjeeling Pulbazar Block, Darjeeling Division, PHED, G.T.A. |
000110ORD/000247/2023-202 |
ORD/000247/2023-2024 |
87/NKWSMD |
11/01/2024 |
1 |
26.96 |
RIMBICK Piped Water Supply Scheme (SM/16123) |
25.53 |
25.53 |
51 |
Neorakhola W/S Mnt. Division |
GARGO TRADERS |
Water Supply Scheme for MIM Tea Garden PWSS In Jore Bunglow Sukhiapokhari Under Darjeeling District. |
000110ORD/000255/2022-202 |
ORD/000255/2022-2023 |
1618/NKWSM |
03/11/2022 |
1 |
96.98 |
GRAVITY BASED WATER SUPPLY SCHEME FOR MIM TEA GARDEN PWSS, BLOCK : JORE BUNGALOW SUKHIAPOKHRI, DISTRICT : DARJEELING (SM/12736) |
40 |
40 |
52 |
Neorakhola W/S Mnt. Division |
GARGO TRADERS |
WATER SUPPLY SCHEME FOR CHAMU TEA GARDEN PWSS IN JOREBUNGLOW SUKIAPAKHRI BLOCK UNDER DARGEELING DISTRICT. |
000110ORD/000257/2022-202 |
ORD/000257/2022-2023 |
1620/NKWSM |
03/11/2022 |
1 |
128.57 |
GRAVITY BASED WATER SUPPLY SCHEME FOR CHAMU TEA GARDEN PWSS, BLOCK- JORE BUNGLOW, SUKHIAPOKHRI, DISTRICT- DARJEELING. (SM/11952) |
50 |
50 |
53 |
Neorakhola W/S Mnt. Division |
ROSHAN BISWAKARMA |
SURFACE WATER BASED MANI KHOPE PIPED WATER SUPPLY SCHEME TO ACCMMODATE FHTC IN KURSEONG BLOCK WITHIN DARJEELING DISTRICT UNDER KURSEONG DIVISION, PHE DTE. |
000110ORD/000268/2022-202 |
ORD/000268/2022-2023 |
1749/NKWSM |
25/11/2022 |
1 |
38.97 |
PWSS Scheme for Mani Khope under Kurseong Sub Division ,PHED,GTA (SM/10805) |
26.62 |
26.62 |
54 |
Neorakhola W/S Mnt. Division |
BITIS PRADHAN AND BROTHERS |
PIPED WATER SUPPLY SCHEME AT LOWER SIRUBARI WITH FUNCTIONAL HOUSEHOLD TAP CONNECTION UNDER JAL JEEVAN MISSION AND JAL SWAPNO PROGRAMME UNDER KURSEONG DIVISION PHED-GTA, DARJEELING. |
000110ORD/000269/2022-202 |
ORD/000269/2022-2023 |
1748/NKWSM |
25/11/2022 |
1 |
3.21 |
Piped Water Supply Scheme at Lower Sirubari with Functional Household Tap Connection under Jal Jeevan Mission under Kurseong Sub Division ,PHED,GTA, Darjeeling. (SM/11348) |
0.5 |
0.5 |
55 |
Neorakhola W/S Mnt. Division |
SRINIWAS AGARWAL |
SURFACE WATER BASED BONG KHAS MAHAL PWS SCHEME TO ACCOMMODATE FHTC IN KALIMPONG-I BLOCK WITHIN KALIMPONG DISTRICT UNDER NEORAKHOLA W/S & Mtc DIVISION, PHE DTE
|
000110ORD/000274/2022-202 |
ORD/000274/2022-2023 |
1876/NKWSM |
14/12/2022 |
1 |
50.34 |
DETAILED PROJECT REPORT FORPROPOSED GRAVETY BASED & PUMPING BASEDPIPED WATER SUPPLY SCHEME FOR BONGKHASMAHAL, BLOCK : KALIMPONG - I, DISTRICT: Kalimpong (SM/13604) |
48.98 |
48.98 |
56 |
Neorakhola W/S Mnt. Division |
CIVIL ENGINEERING CONSULTANCY |
Preparation of Re-draft of proposal including preparation of maps in KML file, DGPS Map, SOI Map, uploading of proposal in PARIVESH PORTAL for forest land diversion in 03 (three) number of scheme under JJM (Jal Jeevan Mission). |
000110ORD/000274/2023-202 |
ORD/000274/2023-2024 |
1594/NKWSM |
29/12/2023 |
1 |
0.57 |
PROJECT REPORT FOR WATER SUPPLY SCHEME FOR LIZZIEPUR TEA GARDEN PWSS IN KURSEONG BLOCK UNDER DARJEELING DISTRICT. (SM/16534) |
0.4 |
0.4 |
57 |
Neorakhola W/S Mnt. Division |
SUNRISE ENTERPRISES |
Water Supply Scheme for Montiviot Tea Garden Piped Water Supply Scheme in Kurseong Under Darjeeling District. |
000110ORD/000286/2022-202 |
ORD/000286/2022-2023 |
2081/NKWSM |
10/01/2023 |
1 |
24.79 |
DETAILED PROJECT REPORT FOR WATER SUPPLY SCHEME FOR MONTIVIOT TEA GARDEN FROM KURSEONG BLOCK UNDER DARJEELING DISTRICT. (SM/11943) |
6 |
6 |
58 |
Neorakhola W/S Mnt. Division |
JOJO CONSTUCTION |
Creating Gravity Based Piped Water Supply Scheme With Spring Water For Bindu Under Jal Jeevan Mission Under Gorubathan Block, District Kalimpong. Under P.H.E Dte. |
000110ORD/000295/2022-202 |
ORD/000295/2022-2023 |
2153/NKWSM |
20/01/2023 |
1 |
70.76 |
BINDU PIPED WATER SUPPLY SCHEME (SM/13622) |
64.59 |
64.59 |
59 |
Neorakhola W/S Mnt. Division |
DIL KUMAR RAI |
PROPOSED GRAVITY BASED & PUMPING BASED PIPED WATER SUPPLY SCHEME FOR LOLAY KHASMAHAL (PART) PIPED WATER SUPPLY SCHEME, BLOCK : KALIMPONG - II, DISTRICT:KALIMPONG |
000110ORD/000301/2022-202 |
ORD/000301/2022-2023 |
2352/NKWSM |
01/02/2023 |
1 |
141.88 |
LOLAY KHASMAHAL PIPED WATER SUPPLYSCHEME, BLOCK : KALIMPONG - II, DISTRICT :KALIMPONG (SM/13603) |
137.54 |
137.54 |
60 |
Neorakhola W/S Mnt. Division |
TASHI BHUTIA |
PROPOSED Creating gravity based piped water supply scheme for Zone 1 under Today Tangta Khasmahal under Gorubathan Block under Kalimpong District under PHE Dte |
000110ORD/000302/2022-202 |
ORD/000302/2022-2023 |
2353/NKWSM |
01/02/2023 |
1 |
163.09 |
TODAY TANGTA KHASMAHAL PWSS (SM/14171) |
132.89 |
132.89 |
61 |
Neorakhola W/S Mnt. Division |
JUSTINE BHUTIA |
PROPOSED GRAVITY BASED & PUMPING BASED PIPED WATER SUPPLY SCHEME FOR SANTUK KHASMAHAL UNDER BLOCK : KALIMPONG - II, DISTRICT:KALIMPONG |
000110ORD/000312/2022-202 |
ORD/000312/2022-2023 |
2492/NKWSM |
09/02/2023 |
1 |
461.44 |
SANTUK KHASMAHAL PIPED WATER SUPPLYSCHEME, BLOCK : KALIMPONG - II, DISTRICT :KALIMPONG (SM/14191) |
442.98 |
442.98 |
62 |
Neorakhola W/S Mnt. Division |
GARGO TRADERS |
WATER SUPPLY SCHEME FOR PLUNGDUNG KHASMAHAL PIPED WATER SUPPLY SCHEME IN BLOCK JOREBUNGLOW SUKIAPOKRI UNDER DISTRICT DARJEELING. |
000110ORD/000317/2022-202 |
ORD/000317/2022-2023 |
2521/NKWSM |
15/02/2023 |
1 |
289.83 |
GRAVITY BASED WATER SUPPLY FOR PULUNGDONG KHASMAHAL PWSS (SM/14418) |
194.86 |
194.86 |
63 |
Neorakhola W/S Mnt. Division |
KAMAKHAYA CONSTRUCTION |
PROPOSED PUMPING BASED PIPED WATER SUPPLY SCHEME FOR RAMBI BAZAR DIF UNDER TEESTA G.P, BLOCK : KALIMPONG - I, DISTRICT:KALIMPONG |
000110ORD/000322/2022-202 |
ORD/000322/2022-2023 |
2652/NKWSM |
28/02/2023 |
1 |
86.66 |
PROPOSED PUMPING BASED PIPED WATER SUPPLY SCHEME FOR RAMBI BAZAR D I F UNDER TEESTA G.P, BLOCK : KALIMPONG - I, DISTRICT:KALIMPONG (SM/15642) |
39 |
39 |
64 |
Neorakhola W/S Mnt. Division |
THUPDEN BHUTIA |
PROPOSED GRAVITY BASED PIPED WATER SUPPLY SCHEME FOR PANKHASARI KHASMAHAL (PART) UNDER GORUBATHAN II G.P, BLOCK : GORUBATHAN, DISTRICT:KALIMPONG |
000110ORD/000327/2022-202 |
ORD/000327/2022-2023 |
2660/NKWSM |
28/02/2023 |
1 |
8.61 |
GRAVITY BASED PIPED WATER SUPPLY SCHEME FOR PANKHASARI KHASMAHAL (PART) UNDER GORUBATHAN II G.P, BLOCK : GORUBATHAN, DISTRICT:KALIMPONG (SM/15463) |
4 |
4 |
65 |
Neorakhola W/S Mnt. Division |
MAHENDRA ADHIKARI |
SURFACE WATER BASED RANGMOHAN PWSS TO ACCOMODATE FHTC IN
MIRIK BLOCK |
000110ORD/000330/2022-202 |
ORD/000330/2022-2023 |
2669/NKWSM |
01/03/2023 |
1 |
108.27 |
RANGMOHAN PIPED WATER SUPPLY SCHEME (SM/15880) |
105.36 |
105.36 |
66 |
Neorakhola W/S Mnt. Division |
YAMA CONSTRUCTIONS LLP |
(Continuation) Hiring of Vehicle for the Office of the Superintending Engineer, G.T.A-Circle, Public Health Engineering Directorate for the period of 6 (Six) Months for G.T.A Area from 01/02/2024 to 31/07/2024.
Note:
With effect from the date of issui |
000110ORD/000330/2023-202 |
ORD/000330/2023-2024 |
169/NKWSMD |
31/01/2024 |
6 |
2.35 |
Augmentation of Neorakhola Water Supply Scheme for extending FHTC Facility to the enroute habitations under Kalimpong Block-I & Block-II under Neorakhola W/S & Mtc Division ,PHE Dte., Kalimpong (SM/10052) |
2.35 |
2.35 |
67 |
Neorakhola W/S Mnt. Division |
SRINIWAS AGARWAL |
WATER SUPPLY SCHEME FOR MOONDA KOTTE TEA GARDEN PIPED WATER SUPPLY SCHEME IN BLOCK JOREBUNGLOW SUKIAPOKRI UNDER DISTRICT DARJEELING. |
000110ORD/000337/2022-202 |
ORD/000337/2022-2023 |
2734/NKWSM |
03/03/2023 |
1 |
169.34 |
DETAILED PROJECT REPORT FOR WATER SUPPLY SCHEME FOR MOONDA KOTEE TEA GARDEN PWSS, BLOCK: JORE BUNGALOW-SUKHIAPOKHRI, DISTRICT: DARJEELING. (SM/13571) |
50 |
50 |