1 |
Hooghly Division |
DILIP KUMAR CHANDRA |
ENGAGEMENT OF CONTRACTUAL ASSISTANT ENGINEER ENGAGED IN VARIOUS DIVISION RELATED TO SUPPORT ACTIVITY UNDER JAL JEEVAN MISSION, PROJECT ID :-PH222360586S000 MEMO NO. GO2223006799PH DATED 29.08.2022 |
000075 |
|
GO22230067 |
29/08/2022 |
7 |
143.65 |
Engagement of Contractual Assistant Engineers engaged in various divisions related to Support Activity under Jal Jeevan Mission (SM/11975) |
76.24 |
76.24 |
2 |
Hooghly Division |
ENVIROTECH SOLUTIONS |
Preparation of DPR for different works for providing Functional Household Tap Connection (FHTC) of Sinhal Pathan Piped Water Supply Scheme under Singur Block, Hooghly District under Chandannagar Sub-Division, PHE Dte. (PART-A). |
000075ORD/000010/2024-202 |
ORD/000010/2024-2025 |
428/Chan |
09/04/2024 |
1 |
0.92 |
SINHAL PATAN PIPED WATER SUPPLY SCHEME (SM/18103) |
0.92 |
0.92 |
3 |
Hooghly Division |
ANALYTICA FOODTECH SERVICES PV |
BAINCHIPOTA (ZONE-I) Piped Water Supply Scheme with Sinking of tube-well, LDS, Rising Main, FHTC, Construction of 250 cum capacity RCC OHR with 20.0 mtr. Staging height including soil investigation & construction of switch-rooms & boundary walls at differ |
000075ORD/000011/2023-202 |
ORD/000011/2023-2024 |
1041/Hug |
10/04/2023 |
1 |
57.37 |
GROUND WATER BASED BAINCHIPOTA(ZONE-I) PWSS (SM/17289) |
57.37 |
57.37 |
4 |
Hooghly Division |
ENVIROTECH SOLUTIONS |
Preparation of DPR for different works for providing Functional Household Tap Connection (FHTC) of Sinhal Pathan Piped Water Supply Scheme under Singur Block, Hooghly District under Chandannagar Sub-Division, PHE Dte. (PART-B). |
000075ORD/000011/2024-202 |
ORD/000011/2024-2025 |
429/chan |
09/04/2024 |
1 |
0.84 |
SINHAL PATAN PIPED WATER SUPPLY SCHEME (SM/18103) |
0.84 |
0.84 |
5 |
Hooghly Division |
M/S SHIVAM UDYOG |
JAGANNATHBATI Piped Water Supply Scheme with Sinking of tubewell, LDS, Rising Main, FHTC, Construction of 100 cum capacity RCC OHR with 20.0 mtr. with Staging height including soil investigation & construction of switch-rooms & boundary walls at different |
000075ORD/000012/2023-202 |
ORD/000012/2023-2024 |
1042/Hug |
10/04/2023 |
1 |
53.44 |
JAGANNATHBATI PIPED WATER SUPPLY SCHEME BLOCK: CHANDITALA-II, DISTRICT: HOOGHLY (SM/17176) |
53.44 |
53.44 |
6 |
Hooghly Division |
ENVIROTECH SOLUTIONS |
Preparation of DPR for different works for providing Functional Household Tap Connection (FHTC) of Sinhal Pathan Piped Water Supply Scheme under Singur Block, Hooghly District under Chandannagar Sub-Division, PHE Dte. (PART-C). |
000075ORD/000012/2024-202 |
ORD/000012/2024-2025 |
430/chan |
09/04/2024 |
1 |
0.78 |
SINHAL PATAN PIPED WATER SUPPLY SCHEME (SM/18103) |
0.78 |
0.78 |
7 |
Hooghly Division |
MUNSHI TAJUDDIN |
Construction of 3.6 m X 3.0 m Switch Room with Sanitary and Water Supply arrangement, Boundary Wall in Proposed T.W Site, Laying rising main pipe for inter connection between T.W & Distribution For Source Augmentation of SHYAMBALLAVPUR Piped Water Supply |
000075ORD/000077/2023-202 |
ORD/000077/2023-2024 |
1311/HUG |
10/05/2023 |
1 |
6.43 |
Source Augmentation of SHYAMBALLAVPUR Piped Water Supply Scheme Under Goghat-I Block (SM/15810) |
6.43 |
6.43 |
8 |
Hooghly Division |
SRI KRISHNA ENTERPRISE |
Construction of 3.6 m X 3.0 m Switch Room with Sanitary and Water Supply arrangement, Boundary Wall in Proposed T.W Site, Laying rising main pipe for inter connection between T.W & Distribution For Source Augmentation of Santoshpur Piped Water Supply Sche |
000075ORD/000078/2023-202 |
ORD/000078/2023-2024 |
1312/HUG |
10/05/2023 |
1 |
3.57 |
Source Augmentation of Santoshpur Piped Water Supply scheme, Block- Tarakeswar, District-Hooghly (SM/15793) |
3.57 |
3.57 |
9 |
Hooghly Division |
MA KANKALI ENTERPRISE |
BALIDAHA Piped Water Supply Scheme with Sinking of tube-well, LDS, Rising Main, FHTC & construction of switch-room & boundary wall at Proposed TW site, under CHINSURAH Sub-Division of Hooghly Division P.H.E Dte. Block DHANIAKHALI, District:- Hooghly [NEW |
000075ORD/000096/2023-202 |
ORD/000096/2023-2024 |
1363/HUG |
12/05/2023 |
1 |
7.62 |
BALIDAHA PWSS PIPED WATER SUPPLY SCHEME UNDER DHANIAKHALI BLOCK. (SM/18101) |
7.62 |
7.62 |
10 |
Hooghly Division |
CITYCON UNEMPLOYED ENGINEERS C |
Construction of 2 Nos. 3.6 m X 3.0 m Switch Room with Additional Plinth Height, with Sanitary and Water Supply arrangement, Laying of C.I/D.I pipes & specials for connection of Proposed 2 nos. T.W with distribution system, For Development of BORHAL (ZONE- |
000075ORD/000111/2023-202 |
ORD/000111/2023-2024 |
1440/HUG |
18/05/2023 |
1 |
8.93 |
Development of Borhal (Zone-I) Piped Water Supply Scheme by Installing Two (2) Nos. Tube Well including Connection with Distribution, Switch Room & other allied work to meet up the additional water demand induced after execution of FHTC under Serampore Se (SM/16449) |
8.93 |
8.93 |
11 |
Hooghly Division |
KARALI MOHAN KHAMRUI |
Construction of 2 Nos. 3.6 m X 3.0 m Switch Room with Additional Plinth Height, with Sanitary and Water Supply arrangement, Laying of C.I/D.I pipes & specials for connection of Proposed 2 nos. T.W with distribution system, For Source Augmentation of SABAL |
000075ORD/000114/2023-202 |
ORD/000114/2023-2024 |
1443/HUG |
18/05/2023 |
1 |
13.28 |
Source Augmentation of SABALSINGHAPUR Piped Water Supply Scheme under Khanakul-II Block (SM/16121) |
13.28 |
13.28 |
12 |
Hooghly Division |
S.S. CONSULTANCY AND CONSTRUCT |
Construction of 2 Nos. 3.6 m X 3.0 m Switch Room with Additional Plinth Height, with Sanitary and Water Supply arrangement, Laying of C.I/D.I pipes & specials for connection of Proposed 2 nos. T.W with distribution system, For Source Augmentation of JAGAT |
000075ORD/000115/2023-202 |
ORD/000115/2023-2024 |
1444/HUG |
18/05/2023 |
1 |
12.34 |
Source Augmentation of JAGATPUR Piped Water Supply Scheme under Khanakul-II Block (SM/16122) |
12.34 |
12.34 |
13 |
Hooghly Division |
CONCORD PROJECTS PRIVATE LIMIT |
KALACHHARA Piped Water Supply Scheme with Sinking of tube-well, LDS, Rising Main, FHTC & construction of switch-room & boundary wall at Proposed TW site, under Chandannagar Sub-Division of Hooghly Division P.H.E Dte. Block Singur, District:- Hooghly [NEW |
000075ORD/000132/2023-202 |
ORD/000132/2023-2024 |
1484/HUG |
19/05/2023 |
1 |
58.76 |
KALACHHARA PIPED WATER SUPPLY SCHEME (SM/18100) |
58.76 |
58.76 |
14 |
Hooghly Division |
SRI KRISHNA ENTERPRISE |
CONSTRUCTION OF 1NO. TEMPORARY KIOSK FOR THE NECESSARY ARRANGEMENT OF ELECTRIFICATION OF TUBEWELL AT JAGANNATHBATI HW SITE UNDER SERAMPORE SUB-DIVISION OF HOOGHLY DIVISION P.H.E, DTE. |
000075ORD/000149/2024-202 |
ORD/000149/2024-2025 |
432/SER |
31/07/2024 |
1 |
0.36 |
JAGANNATHBATI PIPED WATER SUPPLY SCHEME BLOCK: CHANDITALA-II, DISTRICT: HOOGHLY (SM/17176) |
0.36 |
0.36 |
15 |
Hooghly Division |
AYUSH ENTERPRISE |
Construction of 2 Nos. 3.6 m X 3.0 m Switch Room with Additional Plinth
Height, with Sanitary and Water Supply arrangement,Laying of C.I/D.I pipes
& specials for connection of Proposed 2 nos.T.W with distribution system,
FHTC of SHIBRAI W/S Scheme unde |
000075ORD/000158/2023-202 |
ORD/000158/2023-2024 |
1601/HUG |
01/06/2023 |
1 |
9.09 |
SOURCE AUGMENTATION OF GROUND WATER BASED PIPED WATER SUPPLY SCHEME FOR SHIBRAI W/S SCHEME UNDER PANDUA BLOCK (SM/15801) |
9.09 |
9.09 |
16 |
Hooghly Division |
M/S R K ENTERPRISE |
PURBBA KRISHNAPUR Piped Water Supply Scheme with Sinking of tube-well, LDS, Rising Main, FHTC, Construction of 200 cum capacity RCC OHR with 20.0 mtr. Staging height including soil investigation & construction of switch-rooms & boundary walls at different |
000075ORD/000177/2023-202 |
ORD/000177/2023-2024 |
1682/HUG |
08/06/2023 |
1 |
45.98 |
GROUND WATER BASED PURBBA KRISHNAPUR PIPED WATER SUPPLY SCHEME IN ARAMBAGH BLOCK UNDER HOOGHLY, HOOGHLY DISTRICT (SM/17625) |
45.98 |
45.98 |
17 |
Hooghly Division |
MAA TARA CONSTRUCTION |
MAHISHTIKRI ZONE-I Piped Water Supply Scheme with Sinking of tube-well, LDS, Rising Main, FHTC & construction of switch-rooms & boundary walls at different TW site under HARIPAL Block, District:- Hooghly [NEW SCHEME] |
000075ORD/000195/2023-202 |
ORD/000195/2023-2024 |
1786/HUG |
16/06/2023 |
1 |
62.06 |
Mahishtikri (Zone-I) Piped Water Supply Scheme, Block- Haripal, District-Hooghly (SM/16979) |
62.06 |
62.06 |
18 |
Hooghly Division |
BANSBERIA CONSTRUCTION CO. |
NILARPUR Piped Water Supply Scheme with Sinking of tube-well, LDS, Rising Main, FHTC, Construction of 150 cum capacity RCC OHR with 20.0 mtr. with Staging height including soil investigation & construction of switch-rooms & boundary walls at different TW |
000075ORD/000230/2023-202 |
ORD/000230/2023-2024 |
2063/HUG |
17/07/2023 |
1 |
56.7 |
Nilarpur Piped Water Supply Scheme, Block-Jangipara, District-Hooghly (SM/18105) |
56.7 |
56.7 |
19 |
Hooghly Division |
TAPAS ADHYA |
RAJHAT Piped Water Supply Scheme with Sinking of tube-well, LDS, Rising Main, FHTC & construction of switch-room & boundary wall at Proposed TW site, under Chinsurah Sub-Division of Hooghly Division P.H.E Dte. Block Polba-Dadpur, District:- Hooghly [NEW S |
000075ORD/000240/2023-202 |
ORD/000240/2023-2024 |
2078/HUG |
18/07/2023 |
1 |
33.92 |
RAJHAT PIPED W/S SCHEME (FOR UNCOVERED AREA) UNDER POLBA DADPUR BLOCK (SM/18095) |
33.92 |
33.92 |
20 |
Hooghly Division |
M/S R.M. CONSTRUCTION |
PUKHURIA Piped Water Supply Scheme with Sinking of tube-well, LDS, Rising Main, FHTC, Construction of 200 cum capacity RCC OHR with 20.0 mtr. with Staging height including soil investigation & construction of switch-rooms & boundary walls at different TW |
000075ORD/000272/2023-202 |
ORD/000272/2023-2024 |
2290/HUG |
03/08/2023 |
1 |
41.47 |
GROUND WATER BASED PUKHURIA PIPED WATER SUPPLY SCHEME IN GOGHAT-II BLOCK UNDER HOOGHLY, HOOGHLY DISTRICT (SM/17626) |
41.47 |
41.47 |
21 |
Hooghly Division |
SAMIRON GHOSH |
BALARAMBATI Piped Water Supply Scheme with Sinking of tube-well, LDS, Rising Main, FHTC, Construction of 450 cum capacity RCC OHR with 20.0 mtr Staging height including soil investigation & construction of switch-rooms & boundary walls at different TW s |
000075ORD/000284/2023-202 |
ORD/000284/2023-2024 |
2334/HUG |
07/08/2023 |
1 |
146.77 |
GROUND WATER BASED BALARAMBATI PIPED W/S SCHEME (SM/18657) |
146.77 |
146.77 |
22 |
Hooghly Division |
SUBHAJIT BISWAS |
Sinking of Two Nos. Big Dia Tube Well (300 mm X 200 mm) with supply of uPVC pipes & Strainer having depth upto150 Mtr at KAPSIT PWSS of ARAMBAGH Sub-Division under Hooghly Division, PHE Dte. |
000075ORD/000501/2023-202 |
ORD/000501/2023-2024 |
2861/HUG |
20/09/2023 |
1 |
11.07 |
Source Augmentation of KAPSIT Piped Water Supply Scheme under Arambag Block (SM/15814) |
11.07 |
11.07 |
23 |
Hooghly Division |
B.R SUPPLIERS |
Sinking of Two Nos. Big Dia Tube Well (300 mm X 200 mm) with supply of uPVC pipes & Strainer having depth upto150 Mtr at PRATAPNAGAR PWSS of ARAMBAGH Sub-Division under Hooghly Division, PHE Dte. |
000075ORD/000502/2023-202 |
ORD/000502/2023-2024 |
2862/HUG |
20/09/2023 |
1 |
11.04 |
Source Augmentation of PRATAPNAGAR Piped Water Supply Scheme under Arambag Block (SM/15807) |
11.04 |
11.04 |
24 |
Hooghly Division |
S.K ENTERPRISE |
Sinking of 3rd tube-well by D.R. Rig method, Construction of 5.4 m X 3.6 m Switch Room with Sanitary and Water Supply arrangement, Construction of Boundary Wall, Laying rising main pipe for inter connection between Proposed T.W & Distribution of BALARAMBA |
000075ORD/000529/2023-202 |
ORD/000529/2023-2024 |
3008/HUG |
05/10/2023 |
1 |
30.39 |
GROUND WATER BASED BALARAMBATI PIPED W/S SCHEME (SM/18657) |
30.39 |
30.39 |
25 |
Hooghly Division |
SUNITI MAIRA |
Laying of pipe line and other necessary maintanance work for improvement of water supply in distribution system at Patna Bhairabpur W/S Scheme under Chinsurah Sub - Division P.H.E. Dte. |
000075ORD/000733/2023-202 |
ORD/000733/2023-2024 |
25/CH |
05/01/2024 |
1 |
4.54 |
SOURCE AUGMENTATION OF PATNA BHAIRAVPUR W/S SCHEME UNDER POLBA DADPUR BLOCK (SM/15900) |
4.54 |
4.54 |
26 |
Hooghly Division |
M/S ALPHA CONSTRUCTION |
Construction of 3.6 m X 3.0 m Switch Room with Sanitary and Water Supply arrangement, Construction of Boundary Wall ,Laying rising main pipe for inter connection between Proposed T.W & Distribution of NASIBPUR Piped Water Supply Scheme under CHANDANNAGAR |
000075ORD/000745/2023-202 |
ORD/000745/2023-2024 |
384/HUG |
08/02/2024 |
1 |
13.39 |
GROUND BASED PWSS FOR NASIBPUR (SM/17627) |
13.39 |
13.39 |
27 |
Hooghly Division |
TAPAS ADHYA |
Sinking of tube-well, Rising Main, construction of switch-room & boundary wall at Rajhat Uttar Proposed TW site, under Chinsurah Sub-Division of Hooghly Division P.H.E Dte. Block Polba-Dadpur, District:- Hooghly |
000075ORD/000748/2023-202 |
ORD/000748/2023-2024 |
381/HUG |
08/02/2024 |
1 |
6.36 |
RAJHAT PIPED W/S SCHEME (FOR UNCOVERED AREA) UNDER POLBA DADPUR BLOCK (SM/18095) |
6.36 |
6.36 |
28 |
Hooghly Division |
GARHBETA - I UNEMPLOYED YOUTH |
Sinking of 3rd tube-well by D.R. Rig method, Construction of 3.6 m X 3.0 m Switch Room with Sanitary and Water Supply arrangement, Construction of Boundary Wall, Laying rising main pipe for inter connection between Proposed T.W & Distribution of GARMANDAR |
000075ORD/000760/2023-202 |
ORD/000760/2023-2024 |
449/HUG |
15/02/2024 |
1 |
12.94 |
GROUND WATER BASED GARMANDARAN (Z-2) PIPED WATER SUPPLY SCHEME IN GOGHAT-II BLOCK UNDER HOOGHLY, HOOGHLY DISTRICT (SM/15887) |
12.94 |
12.94 |
29 |
Hooghly Division |
M/S R.M. CONSTRUCTION |
SIBRAMBATI ZONE-II Piped Water Supply Scheme with Sinking of tube-well, LDS, Rising Main, FHTC, Construction of 150 cum capacity RCC OHR with 20.0 mtr Staging height including soil investigation & construction of switch-rooms & boundary walls at differen |
000075ORD/000800/2022-202 |
ORD/000800/2022-2023 |
937/HUG |
29/03/2023 |
1 |
42.12 |
Sibrambati (Zone-II) Piped Water Supply Scheme, Block-Singur, District-Hooghly (SM/15888) |
42.12 |
42.12 |