1 |
Hooghly Division |
WEST BENGAL STATE RURAL DEVELO |
DAMAGE DUE TO LAY OF PHE PIPELINE FOR THE WORK NAMELY CONSTRUCTION OF ROAD FROM KANTAGORI TO PUINAN TINMANDIRTALA UNDER POLBA DADPUR BLOCK. |
000075 |
|
786/WBSRDA |
14/06/2024 |
5 |
15.8 |
Source Augmentation Of PUINAN piped Water Supply Scheme Under Polba Dadpur Block (SM/18952) |
15.8 |
15.8 |
2 |
Hooghly Division |
RITAM ENTERPRISE |
Construction of 3.6 m X 3.0 m Switch Room with Sanitary and Water Supply arrangement, Boundary Wall in Proposed T.W Site, Laying rising main pipe for inter connection between T.W & Distribution For Source Augmentation of HAZIPUR Piped Water Supply Scheme |
000075ORD/000007/2023-202 |
ORD/000007/2023-2024 |
1013/Hug |
06/04/2023 |
1 |
4.9 |
Source Augmentation of Hazipur Piped Water Supply Scheme under Goghat-II Block (SM/15815) |
4.9 |
4.9 |
3 |
Hooghly Division |
M/S SHIVAM UDYOG |
Construction of 300 cum capacity 20 Mtr. staging height RCC Over Head Reservoir (Superstructure part as per Departmental Drawing), pipe connection and cost of pipes & specials with necessary soil investigation with foundation design as per soil test repor |
000075ORD/000023/2023-202 |
ORD/000023/2023-2024 |
1103/HUG |
17/04/2023 |
1 |
29.77 |
AUGMENTATION OF GROUND BASED PIPED WATER SUPPLY SCHEME FOR SRIKRISHNAPUR (SM/11868) |
29.77 |
29.77 |
4 |
Hooghly Division |
MAA BUNAMATA ENTERPRISE |
Laying HDPE Pipeline From existing Distribution System for providing FHTC of Dumurdaha Zone-I W/S Scheme under Chinsurah Sub - Division under Hooghly Division, PHE Dte. |
000075ORD/000033/2024-202 |
ORD/000033/2024-2025 |
535/CH |
14/06/2024 |
1 |
4.82 |
SOURCE AUGMENTATION OF DUMURDHA PIPED W/S SCHEME UNDER BALAGARH BLOCK (SM/18942) |
4.82 |
4.82 |
5 |
Hooghly Division |
MAA BUNAMATA ENTERPRISE |
Laying HDPE Pipeline From existing existing Distribution System for providing FHTC of Dumurdaha Zone-I W/S Scheme under Chinsurah Sub - Division under Hooghly Division, PHE Dte. |
000075ORD/000042/2024-202 |
ORD/000042/2024-2025 |
544/CH |
18/06/2024 |
1 |
4.43 |
SOURCE AUGMENTATION OF DUMURDHA PIPED W/S SCHEME UNDER BALAGARH BLOCK (SM/18942) |
4.43 |
4.43 |
6 |
Hooghly Division |
M/S SHIVAM UDYOG |
Providing Functional House Hold Tap Connection (FHTC) under JJM withing left out portion at Hatpukur Bakultala & Gopinathpara of MANDARAN PWSS under Chinsurah Sub Division of Hooghly Division P.H.E Dte. |
000075ORD/000043/2024-202 |
ORD/000043/2024-2025 |
545/CH |
14/06/2024 |
1 |
4.09 |
SOURCE AUGMENTATION OF MANDARAN PIPED W/S SCHEME UNDER PANDUA BLOCK (SM/18977) |
4.09 |
4.09 |
7 |
Hooghly Division |
ALOK ENTERPRISE (A UNIT OF SAK |
Augmentation of CHAMPADANGA Water Supply Scheme with Laying Distribution System within MOKTARPUR & LASKARPUR Mouza, Construction of Switch room & Boundary wall for Proposed Switch Room-IV, Repairing of existing Switch Room-III & Boundary Wall & FHTC Work |
000075ORD/000049/2022-202 |
ORD/000049/2022-2023 |
833/Hug |
20/04/2022 |
1 |
4.05 |
Augmentation of Champadanga Water Supply Scheme (SM/10005) |
4.05 |
4.05 |
8 |
Hooghly Division |
M/S BIMAL DAS AND CO. |
Repairing of concrete road due laying of pipe line at Antpukur of Rajhat PWSS under Chinsurah Sub Division of Hooghly Division, P.H.E.Dte. |
000075ORD/000049/2024-202 |
ORD/000049/2024-2025 |
552/CH |
14/06/2024 |
1 |
1.79 |
SOURCE AUGMENTATION OF RAJHAT (Z-I & II) PIPED W/S SCHEME UNDER POLBA DADPUR BLOCK (SM/13677) |
1.79 |
1.79 |
9 |
Hooghly Division |
J.N. CONSTRUCTION (TAPAN KUMAR |
Construction of 700 cum capacity RCC OHR with 20.0 mtr Staging height including soil investigation & FHTC For AUGMENTATION Of JANGIPARA ZONE-I Piped Water Supply Scheme under Serampore Sub-Division Of Hooghly Division P.H.E Dte. Block-JANGIPARA, District: |
000075ORD/000090/2023-202 |
ORD/000090/2023-2024 |
1354/HUG |
12/05/2023 |
1 |
75.34 |
AUGMENTATION OF GROUND WATER BASED PIPED WATER SUPPLY SCHEME FOR JANGIPARA. (SM/10339) |
75.34 |
75.34 |
10 |
Hooghly Division |
ASIA CONSTRUCTION |
DAHAR KUNDU(ZONE-I) Piped Water Supply Scheme with Sinking of tube-well, LDS, Rising Main, FHTC, Construction of 250 cum capacity RCC OHR with 20.0 mtr. with Staging height including soil investigation & construction of switch-rooms & boundary walls at di |
000075ORD/000153/2023-202 |
ORD/000153/2023-2024 |
1567/HUG |
29/05/2023 |
1 |
92.86 |
GROUND WATER BASED DAHAR KUNDU (ZONE-I) PIPED WATER SUPPLY SCHEME IN ARAMBAG BLOCK UNDER HOOGHLY DIVISION, HOOGHLY DISTRICT (SM/14983) |
92.86 |
92.86 |
11 |
Hooghly Division |
SATYA NARAYAN BISWAS |
KHORDAAPURBAPUR Piped Water Supply Scheme with Sinking of tube-well, LDS, Rising Main, FHTC & construction of switch-room & boundary wall at Proposed TW site, under Chandannagar Sub-Division of Hooghly Division P.H.E Dte. Block Singur, District:- Hooghly |
000075ORD/000180/2023-202 |
ORD/000180/2023-2024 |
1686/HUG |
08/06/2023 |
1 |
33.91 |
KHORDAAPURBAPUR PIPED WATER SUPPLY SCHEME (SM/18097) |
33.91 |
33.91 |
12 |
Hooghly Division |
M/S BISWAS CONSTRUCTION |
SIBRAMBATI ZONE-I Piped Water Supply Scheme with Sinking of tube-well, LDS, Rising Main, FHTC, Construction of 300 cum capacity RCC OHR with 20.0 mtr. with Staging height including soil investigation & construction of switch-rooms & boundary walls at diff |
000075ORD/000277/2023-202 |
ORD/000277/2023-2024 |
2296/HUG |
03/08/2023 |
1 |
139.35 |
Sibrambati (Zone-I) Piped Water Supply Scheme, Block- Singur, District-Hooghly (SM/15889) |
139.35 |
139.35 |
13 |
Hooghly Division |
JAL PRAVAHIKA PVT. LTD |
MUNDALIKA ZONE-I Piped Water Supply Scheme with Sinking of tube-well, LDS, Rising Main, FHTC, Construction of 400 cum capacity RCC OHR At ZONE-I & construction of switch-rooms & boundary walls at different TW site under JANGIPARA Block of Serampore Sub- |
000075ORD/000278/2023-202 |
ORD/000278/2023-2024 |
2293/HUG |
03/08/2023 |
1 |
139.45 |
MUNDALIKA PIPED WATER SUPPLY SCHEME BLOCK : JANGIPARA, DISTRICT : HOOGHLY (SM/18320) |
139.45 |
139.45 |
14 |
Hooghly Division |
M/S T.K.B. CONSTRUCTION |
Construction of 300 cum capacity 20 Mtr. staging height RCC Over Head Reservoir (Superstructure part as per Departmental Drawing), pipe connection and cost of pipes & specials with necessary soil investigation with foundation design as per soil test repor |
000075ORD/000331/2023-202 |
ORD/000331/2023-2024 |
2421/HUG |
11/08/2023 |
1 |
34.97 |
AUGMENTATION OF GROUND WATER BASED PIPED WATER SUPPLY SCHEME FOR SIBAICHANDI (SM/11866) |
34.97 |
34.97 |
15 |
Hooghly Division |
M/S PRITI ENTERPRISE |
BENGAI, SAMANTA KHANDA, BHURKUNDA (ZONE-I), BHURKUNDA (ZONE-II),
SELAMPUR (ZONE-I), SELAMPUR (ZONE-II), STTANTIPUR (ZONE-I) AND SHANTIPUR (ZONE-II) piped
water supply Scheme with TW, Switch room, boundary wall, rising main, LDS, FHTC & construction of R |
000075ORD/000558/2023-202 |
ORD/000558/2023-2024 |
3190/HUG |
31/10/2023 |
1 |
2,039.3 |
SAMANTA KHANDA WATER SUPPLY SCHEME (SM/16127) |
254.91 |
254.91 |
16 |
Hooghly Division |
NIRMAN ENGINEERS CO - OPERATIV |
Providing Functional Household Tap Connection (FHTC) under JJM within Masat Mouza in MASAT PWSS, Block CHANDITALA-I under Serampore Sub-Division of Hooghly Division P.H.E Dte. |
000075ORD/000585/2022-202 |
ORD/000585/2022-2023 |
2844/HUG |
16/12/2022 |
1 |
21.44 |
RETROFITTING WORKS FOR PROVIDING 4123 NOS. FUNCTIONAL HOUSEHOLD TAP CONNECTION (FHTC) WITHIN THE COMMAND AREA OF MASAT WATER SUPPLY SCHEME UNDER HOOGHLY DIVISION (SM/11004) |
21.44 |
21.44 |
17 |
Hooghly Division |
DIBYENDU DHARA |
Construction of 3.6 m X 3.0 m Switch Room with Sanitary and Water Supply arrangement and Boundary Wall for Augmentation of RAGHUNATHPUR Piped Water Supply Scheme under Chinsurah Sub-Division of Hooghly Division P.HE Dte. |
000075ORD/000600/2023-202 |
ORD/000600/2023-2024 |
3315/HUG |
10/11/2023 |
1 |
3.11 |
AUGMENTATION OF RAGHUNATHPUR PIPED WATER SUPPLY SCHEME (SM/11969) |
3.11 |
3.11 |
18 |
Hooghly Division |
B.K ENTERPRISE |
Sinking of 5 nos. 300 X200 mm dia Tube Well 240 mtr. Depth by D.R. Rig method using UPVC pipe (CD) and UPVC Deep Well Screen (RDS) at SRIPUR BALAGARH (1No.), NATUNCHAR KRISHNABATI (2Nos.), ITAGARH (2Nos.) W/S Scheme under CHINSURAH Sub-Division of Hooghly |
000075ORD/000610/2023-202 |
ORD/000610/2023-2024 |
3357/HUG |
21/11/2023 |
1 |
86.88 |
SOURCE AUGMENTATION OF SRIPUR BALAGARH PIPED W/S SCHEME UNDER BALAGARH BLOCK (SM/18932) |
43.44 |
43.44 |
19 |
Hooghly Division |
GARHBETA - I UNEMPLOYED YOUTH |
Sinking of 5 nos. 300 X200 mm dia Tube Well 240 mtr. Depth by D.R. Rig method using UPVC pipe (CD) and UPVC Deep Well Screen (RDS) at HANRAL (2Nos.), SUDARSHAN (2Nos.), AMRA (1 No.) W/S Scheme under CHINSURAH Sub-Division of Hooghly Division, P.H.E. Dte. |
000075ORD/000626/2023-202 |
ORD/000626/2023-2024 |
3404/HUG |
23/11/2023 |
1 |
27.3 |
Source Augmentation of SUDARSHAN Piped W/S Scheme Under Polba Dadpur Block. (SM/18949) |
27.3 |
27.3 |
20 |
Hooghly Division |
GARHBETA - I UNEMPLOYED YOUTH |
Sinking of 5 nos. 300 X200 mm dia Tube Well 240 mtr. Depth by D.R. Rig method using UPVC pipe (CD) and UPVC Deep Well Screen (RDS) at GOSWAMI MALIPARA (1 No.), NALDANGA (2 Nos.), KEOTA (1 No.), HASAMPUR (1 No.) W/S Scheme under CHINSURAH Sub-Division of H |
000075ORD/000631/2023-202 |
ORD/000631/2023-2024 |
3406/HUG |
23/11/2023 |
2 |
28.18 |
Source Augmentation Of GOSWAMI MALIPARA Piped Water Supply Scheme Under POlba Dadpur Block (SM/18953) |
28.18 |
28.18 |
21 |
Hooghly Division |
ARUN SEAL AND CO. |
Madhabpur Piped Water Supply Scheme with Sinking of tube-well, LDS, Rising Main, FHTC, Construction of 250 cum capacity RCC OHR with 20.0 mtr. with Staging height including soil investigation & construction of switch-rooms & boundary walls at different TW |
000075ORD/000690/2022-202 |
ORD/000690/2022-2023 |
326/HUG |
03/02/2023 |
1 |
122.64 |
MADHABPUR PIPED WATER SUPPLY SCHEME BLOCK: CHANDITALA-II, DISTRICT: HOOGHLY. (SM/13347) |
122.64 |
122.64 |
22 |
Hooghly Division |
MAA BUNAMATA ENTERPRISE |
Construction of Guard Room at Polba (Z-I) W/S Scheme under Chinsurah Sub-Division P.H.E. Dte. |
000075ORD/000772/2023-202 |
ORD/000772/2023-2024 |
128/CH |
16/02/2024 |
1 |
3.75 |
Augmentation of Polba Water Supply Scheme (SM/10468) |
3.75 |
3.75 |
23 |
Hooghly Division |
DAS ENTERPRISE |
Sinking of Tube Well, Rising Main, Construction of switch-room & boundary wall at Proposed TW site, Repairing of Switch Room & Boundary wall, Repairing of OHR in Zone-I & FHTC within Zone-I & II For Augmentation of BHANDARHATI ZONE-I &II Piped Water Suppl |
000075ORD/000781/2022-202 |
ORD/000781/2022-2023 |
845/HUG |
23/03/2023 |
1 |
18.95 |
AUGMENTATION OF GROUND BASED PIPED WATER SUPPLY SCHEME FOR BHANDARHATI (SM/14040) |
18.95 |
18.95 |
24 |
Hooghly Division |
LIMRA SOCIAL WELFARE SOCIETY |
Designing making and erection of Display Board using logo and tag line of Jal Jeevan Mission to the placed at different work sites and HGJ villages for awareness generation among the people in the district of Hooghly under Chinsurah Sub Division under Hoo |
000075ORD/000818/2023-202 |
ORD/000818/2023-2024 |
196/CH |
29/02/2024 |
1 |
0.95 |
SOURCE AUGMENTATION OF ABDULPUR PIPED W/S SCHEME UNDER BALAGAH BLOCK (SM/18980) |
0.95 |
0.95 |
25 |
Hooghly Division |
LIMRA SOCIAL WELFARE SOCIETY |
Designing making and erection of Display Board using logo and tag line of Jal Jeevan Mission to the placed at different work sites and HGJ villages for awareness generation among the people in the district of Hooghly under Chinsurah Sub Division under Hoo |
000075ORD/000819/2023-202 |
ORD/000819/2023-2024 |
197/CH |
29/02/2024 |
1 |
0.95 |
SOURCE AUGMENTATION OF NATAGARI PIPED W/S SCHEME UNDER BALAGARH BLOCK (SM/18976) |
0.95 |
0.95 |
26 |
Hooghly Division |
LIMRA SOCIAL WELFARE SOCIETY |
Designing making and erection of Display Board using logo and tag line of Jal Jeevan Mission to the placed at different work sites and HGJ villages for awareness generation among the people in the district of Hooghly under Chinsurah Sub Division under Hoo |
000075ORD/000820/2023-202 |
ORD/000820/2023-2024 |
198/CH |
29/02/2024 |
1 |
0.95 |
SOURCE AUGMENTATION OF DEBANANDAPUR PIPED W/S SCHEME UNDER CHINSURAH MAGRA BLOCK (SM/18975) |
0.95 |
0.95 |
27 |
Hooghly Division |
LIMRA SOCIAL WELFARE SOCIETY |
Designing making and erection of Display Board using logo and tag line of Jal Jeevan Mission to the placed at different work sites and HGJ villages for awareness generation among the people in the district of Hooghly under Chinsurah Sub Division under Hoo |
000075ORD/000828/2023-202 |
ORD/000828/2023-2024 |
206/CH |
29/02/2024 |
1 |
0.95 |
SOURCE AUGMENTATION OF CHAPTA PIPED W/S SCHEME UNDER PANDUA BLOCK (SM/18940) |
0.95 |
0.95 |
28 |
Hooghly Division |
LIMRA SOCIAL WELFARE SOCIETY |
Designing making and erection of Display Board using logo and tag line of Jal Jeevan Mission to the placed at different work sites and HGJ villages for awareness generation among the people in the district of Hooghly under Chinsurah Sub Division under Hoo |
000075ORD/000829/2023-202 |
ORD/000829/2023-2024 |
207/CH |
29/02/2024 |
1 |
0.79 |
SOURCE AUGMENTATION OF JAMGRAM PIPED W/S SCHEME UNDER PANDUA BLOCK (SM/18945) |
0.79 |
0.79 |
29 |
Hooghly Division |
SAHA CONSTRUCTION AND CO |
Laying Distribution of left out portion of pipeline to restore the water supply at Chikrand (Zone-II) Water Supply Scheme within Chanditala-II Block under Serampore Sub-Division of Hooghly Division, P.H.E. Dte. |
000075ORD/000889/2023-202 |
ORD/000889/2023-2024 |
813/HUG |
11/03/2024 |
1 |
17.81 |
Source Augmentation of CHIKRAND ZONE-II Piped Water Supply Scheme by installing One (1) no. Tube Well including Connection with Distribution, Switch Room and other allied work to meet up the additional water demand induced after execution of FHTC by local (SM/18967) |
17.81 |
17.81 |
30 |
Hooghly Division |
BASU & SONS |
Restoration & repairing of village road damaged due to laying of pipeline of piped water supply schemes under JJM in HARIT GP of POLBA-DADPUR Block |
000075ORD/000924/2023-202 |
ORD/000924/2023-2024 |
244/CH |
12/03/2024 |
1 |
4.97 |
AUGMENTATION OF HARIT PIPED W/S SCHEME UNDER POLBA DADPUR BLOCK (SM/15243) |
4.97 |
4.97 |
31 |
Hooghly Division |
SHREE JAGANNATH ENTERPRISE |
Repairing of pump house at 2nd TW site of Bandipur Piped Water Supply Scheme under Chandannagar Sub-Division, PHE Dte. |
000075ORD/000946/2023-202 |
ORD/000946/2023-2024 |
285/Chan |
15/03/2024 |
1 |
0.97 |
RETROFITTING FOR BANDIPUR WS SCHEME (SM/16648) |
0.97 |
0.97 |
32 |
Hooghly Division |
SHREE JAGANNATH ENTERPRISE |
Repairing of boundary wall at 2nd TW site of Bandipur Piped Water Supply Scheme Scheme under Chandannagar Sub-Division, PHE Dte. |
000075ORD/000947/2023-202 |
ORD/000947/2023-2024 |
286/Chan |
15/03/2024 |
1 |
0.99 |
RETROFITTING FOR BANDIPUR WS SCHEME (SM/16648) |
0.99 |
0.99 |
33 |
Hooghly Division |
AMBIAN INFRASTRUCTURE |
Approach road at Atisara 2nd Tubewell site under Atisara water supply scheme under Chandannagar Sub-Division, P.H.E. Dte.
|
000075ORD/000955/2023-202 |
ORD/000955/2023-2024 |
293/Chan |
15/03/2024 |
1 |
0.94 |
ATISARA PIPED WATER SUPPLY SCHEME (SM/12727) |
0.94 |
0.94 |
34 |
Hooghly Division |
AMBIAN INFRASTRUCTURE |
Designing making and erection of Display Board using logo and tag line of Jal Jeevan Mission to the placed at different work sites and HGJ villages for awareness generation among the people in the district of Hooghly under Chandannagar Sub Division under |
000075ORD/000975/2023-202 |
ORD/000975/2023-2024 |
303/Chan |
15/03/2024 |
1 |
0.95 |
BASUBATI PIPED WATER SUPPLY SCHEME (SM/12365) |
0.95 |
0.95 |
35 |
Hooghly Division |
AMBIAN INFRASTRUCTURE |
Designing making and erection of Display Board using logo and tag line of Jal Jeevan Mission to the placed at different work sites and HGJ villages for awareness generation among the people in the district of Hooghly under Chandannagar Sub Division under |
000075ORD/000976/2023-202 |
ORD/000976/2023-2024 |
304/Chan |
15/03/2024 |
1 |
0.95 |
GROUND WATER BASED BAINCHIPOTA(ZONE-I) PWSS (SM/17289) |
0.95 |
0.95 |
36 |
Hooghly Division |
AMBIAN INFRASTRUCTURE |
Designing making and erection of Display Board using logo and tag line of Jal Jeevan Mission to the placed at different work sites and HGJ villages for awareness generation among the people in the district of Hooghly under Chandannagar Sub Division under |
000075ORD/000977/2023-202 |
ORD/000977/2023-2024 |
305/Chan |
15/03/2024 |
1 |
0.95 |
KALACHHARA PIPED WATER SUPPLY SCHEME (SM/18100) |
0.95 |
0.95 |
37 |
Hooghly Division |
BIMAL KUMAR HALDER |
Providing FHTC at the left out portions of Choto Khejuria for proiving FHTC in Saptagram Piped Water Supply Scheme under Chinusrah-Magra Block of Chinsurah Sub-Division under Hooghly Division, PHE Dte. |
000075ORD/001040/2023-202 |
ORD/001040/2023-2024 |
282/CH |
14/03/2024 |
1 |
0.96 |
SOURCE AUGMENTATION OF SAPTAGRAM PIPED W/S SCHEME UNDER CHINSURAH MAGRA BLOCK (SM/13409) |
0.96 |
0.96 |
38 |
Hooghly Division |
DAS ENTERPRISE (SAMIR DAS) |
Providing FHTC in rest out portion of at Kelor Para of Harit PWSS under Chinsurah Sub Division under Hooghly Division PHE Dte. |
000075ORD/001042/2023-202 |
ORD/001042/2023-2024 |
284/CH |
14/03/2024 |
1 |
0.97 |
AUGMENTATION OF HARIT PIPED W/S SCHEME UNDER POLBA DADPUR BLOCK (SM/15243) |
0.97 |
0.97 |
39 |
Hooghly Division |
DAS ENTERPRISE (SAMIR DAS) |
Providing FHTC in rest out portion of at Majher Para of Harit PWSS under Chinsurah Sub Division under Hooghly Division PHE Dte. |
000075ORD/001043/2023-202 |
ORD/001043/2023-2024 |
287/CH |
15/03/2024 |
1 |
0.98 |
AUGMENTATION OF HARIT PIPED W/S SCHEME UNDER POLBA DADPUR BLOCK (SM/15243) |
0.98 |
0.98 |
40 |
Hooghly Division |
DAS ENTERPRISE (SAMIR DAS) |
Providing FHTC in rest out portion of at Ichapur of Harit PWSS under Chinsurah Sub Division under Hooghly Division PHE Dte. |
000075ORD/001044/2023-202 |
ORD/001044/2023-2024 |
288/CH |
15/03/2024 |
1 |
0.79 |
AUGMENTATION OF HARIT PIPED W/S SCHEME UNDER POLBA DADPUR BLOCK (SM/15243) |
0.79 |
0.79 |
41 |
Hooghly Division |
NOBLE ENGINEERS CO-OPERATIVE S |
Providing FHTC in rest out portion of at Chatterjee Bagan of Dharampur PWSS under Chinsurah Sub Division under Hooghly Division PHE Dte. |
000075ORD/001045/2023-202 |
ORD/001045/2023-2024 |
289/CH |
15/03/2024 |
1 |
0.95 |
RETROFITTING WORKS OF DHARAMPUR PWSS FOR PROVIDING 1600 NOS. FUNCTIONAL HOUSEHOLD TAP CONNECTION (FHTC) WITHIN COMMAND AREA OF THE SCHEME UNDER HOOGHLY DIVISION PHE DTE. (SM/13356) |
0.95 |
0.95 |
42 |
Hooghly Division |
NOBLE ENGINEERS CO-OPERATIVE S |
Providing FHTC in rest out portion of at Maynadanga of Dharampur PWSS under Chinsurah Sub Division under Hooghly Division PHE Dte. |
000075ORD/001046/2023-202 |
ORD/001046/2023-2024 |
290/CH |
15/03/2024 |
1 |
0.95 |
RETROFITTING WORKS OF DHARAMPUR PWSS FOR PROVIDING 1600 NOS. FUNCTIONAL HOUSEHOLD TAP CONNECTION (FHTC) WITHIN COMMAND AREA OF THE SCHEME UNDER HOOGHLY DIVISION PHE DTE. (SM/13356) |
0.95 |
0.95 |