1 |
Hooghly Division |
EXECUTIVE ENGINEER HOOGHLY HIG |
PAYMENT TO ROAD RESTORATION FOR PWD |
000075 |
|
859/WORKS- |
18/07/2024 |
6 |
66.56 |
Surface Water Based Piped Water Supply Scheme for Arsenic Affected Balagarh & Pandua Blocks (SM/06249) |
66.56 |
66.56 |
2 |
Hooghly Division |
CONCORD ENGINEERING (ASOKE KUM |
Construction of 400 cum capacity OHR with 20 mtr. staging height including Soil Investigation work, Laying Distribution System, Rising Main & Interconnection between O.H.R, TW No-I & II, Construction of 1No 5.4 M X 3.6 M Switch Room with Sanitary and Wate |
000075ORD/000001/2023-202 |
ORD/000001/2023-2024 |
988/Hug |
04/04/2023 |
1 |
62.58 |
PANRRA PIPED WATER SUPPLY SCHEME (SM/11292) |
62.58 |
62.58 |
3 |
Hooghly Division |
ENVIROTECH SOLUTIONS |
Preparation of DPR for different works for providing Functional Household Tap Connection (FHTC) of Bhandardaha Piped Water Supply Scheme under Singur Block, Hooghly District under Chandannagar Sub-Division, PHE Dte. (PART-A). |
000075ORD/000001/2024-202 |
ORD/000001/2024-2025 |
412/Chan |
09/04/2024 |
1 |
0.73 |
BHANDARDAHA PIPED WATER SUPPLY SCHEME (SM/18096) |
0.73 |
0.73 |
4 |
Hooghly Division |
ENVIROTECH SOLUTIONS |
Preparation of DPR for different works for providing Functional Household Tap Connection (FHTC) of Bhandardaha Piped Water Supply Scheme under Singur Block, Hooghly District under Chandannagar Sub-Division, PHE Dte. (PART-B). |
000075ORD/000002/2024-202 |
ORD/000002/2024-2025 |
413/Chan |
09/04/2024 |
1 |
0.84 |
BHANDARDAHA PIPED WATER SUPPLY SCHEME (SM/18096) |
0.84 |
0.84 |
5 |
Hooghly Division |
ENVIROTECH SOLUTIONS |
Preparation of DPR for different works for providing Functional Household Tap Connection (FHTC) of Bhandardaha Piped Water Supply Scheme under Singur Block, Hooghly District under Chandannagar Sub-Division, PHE Dte. (PART-C) |
000075ORD/000003/2024-202 |
ORD/000003/2024-2025 |
414/Chan |
09/04/2024 |
1 |
0.78 |
BHANDARDAHA PIPED WATER SUPPLY SCHEME (SM/18096) |
0.78 |
0.78 |
6 |
Hooghly Division |
ENVIROTECH SOLUTIONS |
Preparation of DPR for different works for providing Functional Household Tap Connection (FHTC) of Kalachara Piped Water Supply Scheme under Haripal Block, Hooghly District under Chandannagar Sub-Division, PHE Dte. (PART-A). |
000075ORD/000004/2024-202 |
ORD/000004/2024-2025 |
416/Chan |
09/04/2024 |
1 |
0.93 |
KALACHHARA PIPED WATER SUPPLY SCHEME (SM/18100) |
0.93 |
0.93 |
7 |
Hooghly Division |
ENVIROTECH SOLUTIONS |
Preparation of DPR for different works for providing Functional Household Tap Connection (FHTC) of Kalachara Piped Water Supply Scheme under Haripal Block, Hooghly District under Chandannagar Sub-Division, PHE Dte. (PART-B). |
000075ORD/000005/2024-202 |
ORD/000005/2024-2025 |
417/Chan |
09/04/2024 |
1 |
0.84 |
KALACHHARA PIPED WATER SUPPLY SCHEME (SM/18100) |
0.84 |
0.84 |
8 |
Hooghly Division |
ENVIROTECH SOLUTIONS |
Preparation of DPR for different works for providing Functional Household Tap Connection (FHTC) of Kalachara Piped Water Supply Scheme under Haripal Block, Hooghly District under Chandannagar Sub-Division, PHE Dte. (PART-C). |
000075ORD/000006/2024-202 |
ORD/000006/2024-2025 |
419/Chan |
09/04/2024 |
1 |
0.78 |
KALACHHARA PIPED WATER SUPPLY SCHEME (SM/18100) |
0.78 |
0.78 |
9 |
Hooghly Division |
RITAM ENTERPRISE |
Construction of 3.6 m X 3.0 m Switch Room with Sanitary and Water Supply arrangement, Boundary Wall in Proposed T.W Site, Laying rising main pipe for inter connection between T.W & Distribution For Source Augmentation of HAZIPUR Piped Water Supply Scheme |
000075ORD/000007/2023-202 |
ORD/000007/2023-2024 |
1013/Hug |
06/04/2023 |
1 |
4.9 |
Source Augmentation of Hazipur Piped Water Supply Scheme under Goghat-II Block (SM/15815) |
4.9 |
4.9 |
10 |
Hooghly Division |
ENVIROTECH SOLUTIONS |
Preparation of DPR for different works for providing Functional Household Tap Connection (FHTC) of Khordapurbapur Piped Water Supply Scheme under Singur Block, Hooghly District under Chandannagar Sub-Division, PHE Dte. (PART-A). |
000075ORD/000007/2024-202 |
ORD/000007/2024-2025 |
420/Chan |
09/04/2024 |
1 |
0.73 |
KHORDAAPURBAPUR PIPED WATER SUPPLY SCHEME (SM/18097) |
0.73 |
0.73 |
11 |
Hooghly Division |
ENVIROTECH SOLUTIONS |
Preparation of DPR for different works for providing Functional Household Tap Connection (FHTC) of Khordapurbapur Piped Water Supply Scheme under Singur Block, Hooghly District under Chandannagar Sub-Division, PHE Dte. (PART-B). |
000075ORD/000008/2024-202 |
ORD/000008/2024-2025 |
421/Chan |
09/04/2024 |
1 |
0.84 |
KHORDAAPURBAPUR PIPED WATER SUPPLY SCHEME (SM/18097) |
0.84 |
0.84 |
12 |
Hooghly Division |
ENVIROTECH SOLUTIONS |
Preparation of DPR for different works for providing Functional Household Tap Connection (FHTC) of Khordapurbapur Piped Water Supply Scheme under Singur Block, Hooghly District under Chandannagar Sub-Division, PHE Dte. (PART-C). |
000075ORD/000009/2024-202 |
ORD/000009/2024-2025 |
422/Chan |
09/04/2024 |
1 |
0.78 |
KHORDAAPURBAPUR PIPED WATER SUPPLY SCHEME (SM/18097) |
0.78 |
0.78 |
13 |
Hooghly Division |
S. HATI |
Bilaspur (Zone-II) Water Supply scheme with LDS, Rising main, FHTC work, Pump House & 500 cum capacity OHR with 20 mtr. staging height including soil investigation at Jangipara Block in Serampore Sub-Division, District:- Hooghly under Hooghly Division, PH |
000075ORD/000011/2022-202 |
ORD/000011/2022-2023 |
755/Hug |
11/04/2022 |
1 |
78.16 |
Bilaspur Piped Water Supply Scheme. (SM/09825) |
78.16 |
78.16 |
14 |
Hooghly Division |
RURAL CONSTRUCTION (MANIK CHAN |
BIGHATI (ZONE-II) Piped Water Supply Scheme with Sinking of tube-well, LDS, Rising Main, FHTC, Construction of 250 cum capacity RCC OHR with 20.0 mtr. Staging height including soil investigation & construction of switch rooms & boundary walls at different |
000075ORD/000017/2023-202 |
ORD/000017/2023-2024 |
1061/HUG |
12/04/2023 |
1 |
75.5 |
Ground Water Based Bighati (Zone -II) PWSS (SM/15249) |
75.5 |
75.5 |
15 |
Hooghly Division |
BIMAL KUMAR HALDER |
Providing FHTC at the left out portions at Itkhola for proiving FHTC in Badinan Piped Water Supply Scheme under Polba Dapur Block of Chinsurah Sub-Division under Hooghly Division, PHE Dte. |
000075ORD/000035/2024-202 |
ORD/000035/2024-2025 |
537/CH |
14/06/2024 |
1 |
2.81 |
SOURCE AUGMENTATION OF BADINAN PIPED W/S SCHEME UNDER POLBA DADPUR BLOCK (SM/15799) |
2.81 |
2.81 |
16 |
Hooghly Division |
BIMAL KUMAR HALDER |
Providing FHTC at the left out portions of Payan majipara for proiving FHTC in Badinan Piped Water Supply Scheme under Polba Dapur Block of Chinsurah Sub-Division under Hooghly Division, PHE Dte. |
000075ORD/000036/2024-202 |
ORD/000036/2024-2025 |
538/CH |
14/06/2024 |
1 |
4.84 |
SOURCE AUGMENTATION OF BADINAN PIPED W/S SCHEME UNDER POLBA DADPUR BLOCK (SM/15799) |
4.84 |
4.84 |
17 |
Hooghly Division |
BIMAL KUMAR HALDER |
Providing FHTC at the left out portions of Priyanagar for proiving FHTC in Badinan Piped Water Supply Scheme under Polba Dapur Block of Chinsurah Sub-Division under Hooghly Division, PHE Dte. |
000075ORD/000037/2024-202 |
ORD/000037/2024-2025 |
539/CH |
14/06/2024 |
1 |
4.84 |
SOURCE AUGMENTATION OF BADINAN PIPED W/S SCHEME UNDER POLBA DADPUR BLOCK (SM/15799) |
4.84 |
4.84 |
18 |
Hooghly Division |
P.B. ENTERPRISE (PINTU BHADURI |
Sinking of tube-well, Rising Main for inter connection between T.W & Distribution, construction of switch-room, boundary wall & Repairing of Existing OHR, Switch Rooms, Boundary walls at different TW sites for Augmentation of ENAYETPUR Piped Water Supply |
000075ORD/000040/2023-202 |
ORD/000040/2023-2024 |
1162/HUG |
20/04/2023 |
1 |
23.04 |
AUGMENTATION OF GROUND WATER BASED PWSS FOR ENAYETPUR (SM/10004) |
23.04 |
23.04 |
19 |
Hooghly Division |
M/S BIMAL DAS AND CO. |
Repairing of concrete road due laying of pipe line at Antpukur of Rajhat PWSS under Chinsurah Sub Division of Hooghly Division, P.H.E.Dte. |
000075ORD/000049/2024-202 |
ORD/000049/2024-2025 |
552/CH |
14/06/2024 |
1 |
1.79 |
SOURCE AUGMENTATION OF RAJHAT (Z-I & II) PIPED W/S SCHEME UNDER POLBA DADPUR BLOCK (SM/13677) |
1.79 |
1.79 |
20 |
Hooghly Division |
WELFARE ENGINEER'S CO - OPERAT |
PURUSHOTTAMPUR Piped Water Supply Scheme with Sinking of tube-well, LDS, Rising Main, FHTC, Construction of 300 cum capacity RCC OHR with 20.0 mtr.Staging height including soil investigation & construction of switch-room & boundary wall at Proposed TW sit |
000075ORD/000056/2023-202 |
ORD/000056/2023-2024 |
1251/HUG |
02/05/2023 |
1 |
86.87 |
PURUSHOTTAMPUR PIPED WATER SUPPLY SCHEME (SM/11582) |
86.87 |
86.87 |
21 |
Hooghly Division |
CREATION CONSTRUCTION |
Augmentation of GOBINDAPUR Piped Water Supply Scheme with Sinking of tube-well, Laying Distribution System, Providing FHTC, construction of switch-room & boundary wall & Repairing of Existing O.H.R, Switch Rooms, Boundary walls at different TW site, under |
000075ORD/000062/2023-202 |
ORD/000062/2023-2024 |
1270/HUG |
03/05/2023 |
1 |
86.06 |
Augmentation of Gobindapur Water Supply Scheme (SM/16351) |
86.06 |
86.06 |
22 |
Hooghly Division |
M/S T.K.B. CONSTRUCTION |
Construction of 3.6 m X 3.0 m Switch Room with Additional Plinth Height, with Sanitary and Water Supply arrangement, Laying of C.I/D.I pipes & specials for connection of Proposed T.W with distribution system , FHTC of KOLA W/S Scheme under Chinsurah Sub - |
000075ORD/000080/2023-202 |
ORD/000080/2023-2024 |
1314/HUG |
10/05/2023 |
1 |
16.38 |
SOURCE AUGMENTATION OF KOLA W/S SCHEME UNDER CHINSURAH MAGRA BLOCK (SM/15899) |
16.38 |
16.38 |
23 |
Hooghly Division |
J.N. CONSTRUCTION (TAPAN KUMAR |
Construction of 600 cum capacity RCC OHR with 20.0 mtr. Staging height including soil investigation, T.W, Rising Main, FHTC For AUGMENTATION of BARAKAMALPUR (ZONE-III) Piped Water Supply Scheme under Chandannagar Sub-Division of Hooghly Division P.HE Dte. |
000075ORD/000091/2023-202 |
ORD/000091/2023-2024 |
1355/HUG |
12/05/2023 |
1 |
61.28 |
AUGMENTATION OF GROUND WATER BASED PIPED WATER SUPPLY SCHEME FOR BARAKAMALPUR (SM/12369) |
61.28 |
61.28 |
24 |
Hooghly Division |
SWASTIK ENTERPRISE |
Augmentation of KAKNAN (ZONE-II) Water Supply Scheme with Laying Distribution System & Functional Household Tap Connection, Construction of Switch Room & Boundary Wall of 3rd T.W Site at KHANAKUL-II Block under Arambag Sub-Division, PHE Dte. |
000075ORD/000095/2022-202 |
ORD/000095/2022-2023 |
1086/Hug |
02/06/2022 |
1 |
3.5 |
AUGMENTATION OF GROUND WATER BASED PIPED WATER SUPPLY SCHEME FOR KAKNAN BLOCK: KHANKUL-II (SM/09688) |
3.5 |
3.5 |
25 |
Hooghly Division |
S & P ENTERPRISE |
BIGHATI (ZONE-I) Piped Water Supply Scheme with Sinking of tube-well, LDS, Rising Main, FHTC, Construction of 250 cum capacity RCC OHR with 20.0 mtr. Staging height including soil investigation & construction of switch-rooms & boundary walls at different |
000075ORD/000099/2023-202 |
ORD/000099/2023-2024 |
1374/HUG |
15/05/2023 |
1 |
67.27 |
Bighati Piped Water Supply Scheme, Block- Singur, District-Hooghly (SM/16236) |
67.27 |
67.27 |
26 |
Hooghly Division |
S & P ENTERPRISE |
PARJANA Piped Water Supply Scheme with Sinking of tube-well, LDS, Rising Main, FHTC, Construction of 450 cum capacity RCC OHR with 20.0 mtr. Staging height including soil investigation & construction of switch-rooms & boundary walls at different TW site u |
000075ORD/000102/2023-202 |
ORD/000102/2023-2024 |
1406/Hug |
17/05/2023 |
1 |
162.24 |
PARJANA PIPED WATER SUPPLY SCHEME (SM/13335) |
162.24 |
162.24 |
27 |
Hooghly Division |
ASIA CONSTRUCTION |
DAHAR KUNDU(ZONE-I) Piped Water Supply Scheme with Sinking of tube-well, LDS, Rising Main, FHTC, Construction of 250 cum capacity RCC OHR with 20.0 mtr. with Staging height including soil investigation & construction of switch-rooms & boundary walls at di |
000075ORD/000153/2023-202 |
ORD/000153/2023-2024 |
1567/HUG |
29/05/2023 |
1 |
92.86 |
GROUND WATER BASED DAHAR KUNDU (ZONE-I) PIPED WATER SUPPLY SCHEME IN ARAMBAG BLOCK UNDER HOOGHLY DIVISION, HOOGHLY DISTRICT (SM/14983) |
92.86 |
92.86 |
28 |
Hooghly Division |
M/S R K ENTERPRISE |
PURBBA KRISHNAPUR Piped Water Supply Scheme with Sinking of tube-well, LDS, Rising Main, FHTC, Construction of 200 cum capacity RCC OHR with 20.0 mtr. Staging height including soil investigation & construction of switch-rooms & boundary walls at different |
000075ORD/000177/2023-202 |
ORD/000177/2023-2024 |
1682/HUG |
08/06/2023 |
1 |
25.32 |
GROUND WATER BASED PURBBA KRISHNAPUR PIPED WATER SUPPLY SCHEME IN ARAMBAGH BLOCK UNDER HOOGHLY, HOOGHLY DISTRICT (SM/17625) |
25.32 |
25.32 |
29 |
Hooghly Division |
GARHBETA - I UNEMPLOYED YOUTH |
Sinking of 5 nos. 300 X200 mm dia Tube Well 210 mtr. Depth by D.R. Rig method using UPVC pipe (CD) and UPVC Deep Well Screen (RDS) For AUGMENTATION Of Olipur,Kulteghori,Paschim Jaykrishnapur & Barakamalpur W/S Scheme under Chandannagar Sub-Division of Hoo |
000075ORD/000213/2023-202 |
ORD/000213/2023-2024 |
1839/HUG |
26/06/2023 |
1 |
14.45 |
AUGMENTATION OF GROUND WATER BASED PWSS FOR OLIPUR (SM/10022) |
14.45 |
14.45 |
30 |
Hooghly Division |
DOULPHINE ENTERPRISE (RANJIT K |
GHOL DIGRUI (ZONE-II) Piped Water Supply Scheme with Sinking of tube-well, LDS, Rising Main, FHTC,
Construction of 350 cum capacity RCC OHR with 20.0 mtr. with Staging height including soil investigation &
construction of switch-rooms & boundary walls a |
000075ORD/000227/2023-202 |
ORD/000227/2023-2024 |
2035/hug |
13/07/2023 |
1 |
122.22 |
Ghol Digrui (Zone-II) Piped Water Supply Scheme , Block- Pursura, District-Hooghly (SM/18348) |
122.22 |
122.22 |
31 |
Hooghly Division |
SURAJIT SINGHA RAY |
Augmentation of BEGAMPUR (ZONE-II) Water Supply Scheme with LDS, Functional Household Tap Connection & Repairing of existing Switch Room at Chanditala II Block under Serampore Sub-Division, of Hooghly Division, PHE Dte. . [2nd call of NIeT No. WBPHE/EE/13 |
000075ORD/000237/2022-202 |
ORD/000237/2022-2023 |
1786/HUG |
26/08/2022 |
1 |
10.91 |
Augmentation of Ground Water Based Piped Water Supply Scheme for Begampur under Serampore Sub-Division of Hooghly Division , P.H.E. Dte. (SM/11466) |
10.91 |
10.91 |
32 |
Hooghly Division |
M/S R K ENTERPRISE |
KELEPARA Piped Water Supply Scheme with Sinking of tube-well, LDS, Rising Main, FHTC, Construction of 250 cum capacity RCC OHR with 20.0 mtr. with Staging height including soil investigation & construction of switch-rooms & boundary walls at different TW |
000075ORD/000262/2023-202 |
ORD/000262/2023-2024 |
2236/HUG |
01/08/2023 |
1 |
24.76 |
GROUND WATER BASED KELEPARA PIPED WATER SUPPLY SCHEME IN PURSURA BLOCK UNDER HOOGHLY, HOOGHLY DISTRICT (SM/12232) |
24.76 |
24.76 |
33 |
Hooghly Division |
SIBSANKAR CHOWDHURY |
JAGANNATHPUR Piped Water Supply Scheme with Sinking of tube-well, LDS, Rising Main, FHTC, Construction of 300 cum capacity RCC OHR with 20.0 mtr. with Staging height including soil investigation & construction of switch-rooms & boundary walls at differen |
000075ORD/000263/2023-202 |
ORD/000263/2023-2024 |
2237/HUG |
01/08/2023 |
1 |
196.33 |
JAGANNATHPUR PIPED WATER SUPPLY SCHEME BLOCK: JANGIPARA, DISTRICT: HOOGHLY. (SM/12249) |
196.33 |
196.33 |
34 |
Hooghly Division |
MONDAL PRECISION PRIVATE LIMIT |
Construction of switch-rooms & boundary wall at different TW site , LDS & FHTC in Gopalnagar Mouza For AUGMENTATION Of KAMARKUNDU (ZONE-VI) Piped Water Supply Scheme under Chandannagar Sub Division Block-SINGUR , District:- Hooghly[AUGMENTATION ] |
000075ORD/000266/2023-202 |
ORD/000266/2023-2024 |
2240/HUG |
01/08/2023 |
1 |
88.53 |
AUGMENTATION OF GROUND WATER BASED PIPED WATER SUPPLY SCHEME FOR KAMARKUNDU MIRZAPUR BAKIPUR (SM/18397) |
88.53 |
88.53 |
35 |
Hooghly Division |
UNIQUE AGENCY |
TIROL ZONE-II Piped Water Supply Scheme with Sinking of tube-well, LDS, Rising Main, FHTC, Construction of 200 cum capacity RCC OHR with 20.0 mtr. with Staging height including soil investigation & construction of switch-rooms & boundary walls at differe |
000075ORD/000268/2023-202 |
ORD/000268/2023-2024 |
2279/HUG |
03/08/2023 |
1 |
45.58 |
GROUND WATER BASED TIROL (ZONE-II) PIPED W/S SCHEME UNDER ARAMBAGH BLOCK (SM/15886) |
45.58 |
45.58 |
36 |
Hooghly Division |
R.K. TRADERS |
AUGMENTATION OF PATUL Piped Water Supply Scheme with Sinking of tube-well, LDS, Rising Main, FHTC, Construction of 200 cum capacity RCC OHR with 20.0 mtr. with Staging height including soil investigation & construction of switch-rooms & boundary walls at |
000075ORD/000271/2023-202 |
ORD/000271/2023-2024 |
2288/HUG |
03/08/2023 |
1 |
81.91 |
AUGMENTATION OF PATUL PIPED WATER SUPPLY SCHEME, BLOCK- KHANAKUL-I, DISTRICT-HOOGHLY (SM/16120) |
81.91 |
81.91 |
37 |
Hooghly Division |
M/S BISWAS CONSTRUCTION |
SIBRAMBATI ZONE-I Piped Water Supply Scheme with Sinking of tube-well, LDS, Rising Main, FHTC, Construction of 300 cum capacity RCC OHR with 20.0 mtr. with Staging height including soil investigation & construction of switch-rooms & boundary walls at diff |
000075ORD/000277/2023-202 |
ORD/000277/2023-2024 |
2296/HUG |
03/08/2023 |
1 |
139.35 |
Sibrambati (Zone-I) Piped Water Supply Scheme, Block- Singur, District-Hooghly (SM/15889) |
139.35 |
139.35 |
38 |
Hooghly Division |
MINTU CHAKRABORTY |
TIROL ZONE-I Piped Water Supply Scheme with Sinking of tube-well, LDS, Rising Main, FHTC, Construction of 350 cum capacity RCC OHR with 20.0 mtr. with Staging height including soil investigation & construction of switch-rooms & boundary walls at different |
000075ORD/000286/2023-202 |
ORD/000286/2023-2024 |
2338/HUG |
07/08/2023 |
1 |
73.71 |
GROUND WATER BASED TIROL (ZONE-I) PIPED W/S SCHEME UNDER ARAMBAGH BLOCK (SM/18668) |
73.71 |
73.71 |
39 |
Hooghly Division |
M/S T.K.B. CONSTRUCTION |
Construction of 300 cum capacity 20 Mtr. staging height RCC Over Head Reservoir (Superstructure part as per Departmental Drawing), pipe connection and cost of pipes & specials with necessary soil investigation with foundation design as per soil test repor |
000075ORD/000331/2023-202 |
ORD/000331/2023-2024 |
2421/HUG |
11/08/2023 |
1 |
34.97 |
AUGMENTATION OF GROUND WATER BASED PIPED WATER SUPPLY SCHEME FOR SIBAICHANDI (SM/11866) |
34.97 |
34.97 |
40 |
Hooghly Division |
ANALYTICA FOODTECH SERVICES PV |
"GAURIBATI" Piped Water Supply Scheme With LDS, FHTC & Construction of 250 cum capacity OHR with 20 mtr. staging height including Soil Investigation work at TARAKESWAR Block under Chandannagar Sub - Division Under Hooghly Division PHE Dte. |
000075ORD/000475/2022-202 |
ORD/000475/2022-2023 |
2558/HUG |
25/11/2022 |
1 |
102.01 |
GAURIBATI PIPED WATER SUPPLY SCHEME (SM/11289) |
102.01 |
102.01 |
41 |
Hooghly Division |
MIXED ENGINEER'S CO - OPERATIV |
Horizontal Auger boring with water jet system Including Culvert, Approach Road at BADE DIGHARIA Piped Water Supply Scheme under Chandannagar Sub-Division Of Hooghly Division P.H.E Dte. |
000075ORD/000527/2023-202 |
ORD/000527/2023-2024 |
3006/HUG |
05/10/2023 |
1 |
11.18 |
BADE DIGARIA PIPED WATER SUPPLY SCHEME (SM/13336) |
11.18 |
11.18 |
42 |
Hooghly Division |
SURAJIT SINGHA RAY |
Laying D.I Pipe& HDPE Pipe For AUGMENTATION of BARAKAMALPUR (ZONE-III) Piped Water Supply Scheme under Chandannagar Sub-Division of Hooghly Division P.HE Dte. Block SINGUR , District:- Hooghly [AUGMENTATION SCHEME] |
000075ORD/000547/2023-202 |
ORD/000547/2023-2024 |
3117/HUG |
16/10/2023 |
1 |
11.24 |
AUGMENTATION OF GROUND WATER BASED PIPED WATER SUPPLY SCHEME FOR BARAKAMALPUR (SM/12369) |
11.24 |
11.24 |
43 |
Hooghly Division |
MACKINTOSH BURN LIMITED |
MAHISGOT (ZONE-I), MAHISGOT (ZONE-II), POL, RADHABALLAVPUR (ZONE-I), UDAYPUR, UDNA Piped Water Supply Scheme with T.W, SWITCH ROOM, BOUNDARY WALL, RISING MAIN, LDS, FHTC & Construction of OHR with 20 mtr. staging height including Soil Investigation work a |
000075ORD/000549/2023-202 |
ORD/000549/2023-2024 |
3139/HUG |
16/10/2023 |
1 |
1,232.55 |
GROUND WATER BASED UDAYPUR PIPED WATER SUPPLY SCHEME IN KHANAKUL-I BLOCK UNDER HOOGHLY, HOOGHLY DISTRICT (SM/18308) |
205.43 |
205.43 |
44 |
Hooghly Division |
TANISA ENTERPRISE |
BHALIA ZONE-II Piped Water Supply Scheme with Sinking of tube-well, LDS, Rising Main, FHTC & construction of switch-room & boundary wall at Proposed TW site, under Arambagh Sub-Division of Hooghly Division P.H.E Dte. Block Arambagh, District:- Hooghly [NE |
000075ORD/000552/2023-202 |
ORD/000552/2023-2024 |
3181/HUG |
30/10/2023 |
1 |
36.01 |
Bhalia (Zone-II) Piped Water Supply Scheme, Block- Arambagh, District-Hooghly (SM/19014) |
36.01 |
36.01 |
45 |
Hooghly Division |
S & P ENTERPRISE |
BALUNDI,SELALPUR, MADHABPUR, DAHARKUNDU ZONE-II Piped Water Supply Scheme with T.W, SWITCH ROOM , BOUNDARY WALL, RISING MAIN, LDS, FHTC & Construction of OHR with 20 mtr. staging height including Soil Investigation work at ARAMBAGH Block under ARAMBAGH |
000075ORD/000556/2023-202 |
ORD/000556/2023-2024 |
3191/HUG |
31/10/2023 |
1 |
841.82 |
GROUND WATER BASED DAHAR KUNDU (ZONE-II) PIPED WATER SUPPLY SCHEME IN ARAMBAG BLOCK UNDER HOOGHLY DIVISION, HOOGHLY DISTRICT (SM/15913) |
210.46 |
210.46 |
46 |
Hooghly Division |
EQUIPMENTS AND SPARES AGENCIES |
Laying Distribution System of proposed pipe line& construction of switch-rooms at different TW site of MAYAPUR Piped Water Supply Scheme under ARAMBAGH SUB DIVISION Block-Arambagh, District:- Hooghly [NEW SCHEME] |
000075ORD/000593/2023-202 |
ORD/000593/2023-2024 |
3302/Hug |
10/11/2023 |
1 |
95.62 |
Mayapur Piped Water Supply Scheme. (SM/18833) |
95.62 |
95.62 |
47 |
Hooghly Division |
DILIP KUMAR GHOSH |
AUGMENTATION of SRIKRISHNAPUR (Zone-I) Piped Water Supply Scheme with Laying Distribution System Within Srikrishnapur Zone-I (North), providng FHTC & Construction of 3.6m x3.0 m Switch Room at Zone-II at DHANIAKHALI Block under Chinsurah Sub-Division Und |
000075ORD/000597/2022-202 |
ORD/000597/2022-2023 |
2856/HUG12 |
16/12/2022 |
1 |
9.51 |
AUGMENTATION OF GROUND BASED PIPED WATER SUPPLY SCHEME FOR SRIKRISHNAPUR (SM/11868) |
9.51 |
9.51 |
48 |
Hooghly Division |
DIBYENDU DHARA |
Construction of 3.6 m X 3.0 m Switch Room with Sanitary and Water Supply arrangement and Boundary Wall for Augmentation of RAGHUNATHPUR Piped Water Supply Scheme under Chinsurah Sub-Division of Hooghly Division P.HE Dte. |
000075ORD/000600/2023-202 |
ORD/000600/2023-2024 |
3315/HUG |
10/11/2023 |
1 |
3.11 |
AUGMENTATION OF RAGHUNATHPUR PIPED WATER SUPPLY SCHEME (SM/11969) |
3.11 |
3.11 |
49 |
Hooghly Division |
OSMAN SEKH |
Sinking of 5 nos. 300 X200 mm dia Tube Well 240 mtr. Depth by D.R. Rig method using UPVC pipe (CD) and UPVC Deep Well Screen (RDS) at AYMA NABABPUR (2Nos.), DUMURDAHA (1No.), AKNA (1 No.), BAHADURPUR (1 No.) W/S Scheme under CHINSURAH Sub-Division of Hoog |
000075ORD/000620/2023-202 |
ORD/000620/2023-2024 |
3386/HUG |
22/11/2023 |
1 |
17.31 |
SOURCE AUGMENTATION OF BAHADURPUR PIPED W/S SCHEME UNDER DHANIAKHALI BLOCK (SM/18944) |
17.31 |
17.31 |
50 |
Hooghly Division |
ARUN SEAL AND CO. |
Madhabpur Piped Water Supply Scheme with Sinking of tube-well, LDS, Rising Main, FHTC, Construction of 250 cum capacity RCC OHR with 20.0 mtr. with Staging height including soil investigation & construction of switch-rooms & boundary walls at different TW |
000075ORD/000690/2022-202 |
ORD/000690/2022-2023 |
326/HUG |
03/02/2023 |
1 |
122.64 |
MADHABPUR PIPED WATER SUPPLY SCHEME BLOCK: CHANDITALA-II, DISTRICT: HOOGHLY. (SM/13347) |
122.64 |
122.64 |
51 |
Hooghly Division |
M/S T.K.B. CONSTRUCTION |
Laying Distribution of left out portion of pipeline to restore the water supply at Chanditala (Zone-III & IV), Functional Hosuehold Tap Connection at Chanditala Water Supply Scheme within Chanditala-II Block under Serampore Sub-Division of Hooghly Divisio |
000075ORD/000747/2023-202 |
ORD/000747/2023-2024 |
380/HUG |
08/02/2024 |
1 |
19.21 |
AUGMENTATION OF GROUND WATER BASED PIPED WATER SUPPLY SCHEME FOR CHANDITALA. (SM/10338) |
19.21 |
19.21 |
52 |
Hooghly Division |
KAJAL DEY |
Sinking of 3rd tube-well by D.R. Rig method, Construction of 3.6 m X 3.0 m Switch Room with Sanitary and Water Supply arrangement, Construction of Boundary Wall, Laying rising main pipe for inter connection between Proposed T.W & Distribution of RAJBALHAT |
000075ORD/000754/2023-202 |
ORD/000754/2023-2024 |
389/HUG |
08/02/2024 |
1 |
19.1 |
AUGMENTATION OF GROUND WATER BASED PIPED WATER SUPPLY SCHEME FOR RAJBALHAT. (SM/09694) |
19.1 |
19.1 |
53 |
Hooghly Division |
MS PRADIP KUMAR PAL |
Sinking of 3rd tube-well by D.R. Rig method ,Construction of 3.6 m X 3.0 m Switch Room with Sanitary and Water Supply arrangement, Construction of Boundary Wall, Laying rising main pipe for inter connection between Proposed T.W & Distribution of MAYAPUR |
000075ORD/000758/2023-202 |
ORD/000758/2023-2024 |
448/HUG |
15/02/2024 |
1 |
12.09 |
GROUND WATER BASED MAYAPUR (ZONE-I) PIPED WATER SUPPLY SCHEME IN ARAMBAG BLOCK UNDER HOOGHLY DIVISION, HOOGHLY (SM/15791) |
12.09 |
12.09 |
54 |
Hooghly Division |
BMR ENGINEERING & CONSTRUCTION |
Construction of 1 (One) No. Pump House (3.0 x 3.6 m ) with additional plinth height including internal pathway at 6th tubewell site of Bandipur PWSS Scheme under Hooghly Sub-Division, PHE Dte. |
000075ORD/000765/2022-202 |
ORD/000765/2022-2023 |
145/Chan |
16/03/2023 |
1 |
3.25 |
RETROFITTING FOR BANDIPUR WS SCHEME (SM/16648) |
3.25 |
3.25 |
55 |
Hooghly Division |
M/S S.G. CONSTRUCTION |
RADHABALLAVPUR (ZONE-II) Piped Water Supply Scheme with Sinking of tube-well, LDS, Rising Main, FHTC, Construction of 250 cum capacity RCC OHR with 20.0 mtr. Staging height including soil investigation & construction of switch rooms & boundary walls at di |
000075ORD/000779/2022-202 |
ORD/000779/2022-2023 |
833/HUG |
22/03/2023 |
1 |
49.89 |
GROUND WATER BASED RADHABALLAVPUR (ZONE-II) PIPED WATER SUPPLY SCHEME IN KHANAKUL-I BLOCK UNDER HOOGHLY DIVISION, DISTRICT HOOGHLY (SM/14117) |
49.89 |
49.89 |
56 |
Hooghly Division |
DAS ENTERPRISE |
Sinking of Tube Well, Rising Main, Construction of switch-room & boundary wall at Proposed TW site, Repairing of Switch Room & Boundary wall, Repairing of OHR in Zone-I & FHTC within Zone-I & II For Augmentation of BHANDARHATI ZONE-I &II Piped Water Suppl |
000075ORD/000781/2022-202 |
ORD/000781/2022-2023 |
845/HUG |
23/03/2023 |
1 |
18.95 |
AUGMENTATION OF GROUND BASED PIPED WATER SUPPLY SCHEME FOR BHANDARHATI (SM/14040) |
18.95 |
18.95 |
57 |
Hooghly Division |
R.K. TRADERS |
Designing making and erection of Display Board using logo and tag line of Jal Jeevan Mission to the placed for Sajal Gram Display Board at different locations in 6 (Six) Nos villages & HGJ villages of Amodghata PWSS for awareness generation among the peo |
000075ORD/000803/2023-202 |
ORD/000803/2023-2024 |
146/CH |
20/02/2024 |
1 |
0.95 |
SOURCE AUGMENTATION OF AMODGHATA PIPED W/S SCHEME UNDER CHINSURAH MAGRA BLOCK (SM/13346) |
0.95 |
0.95 |
58 |
Hooghly Division |
ROY ENTERPRISE |
Laying of Balance portion of 75 mm dia HDPE Pipe including other allied works at various Mouzas in Bilaspur (Zone-II) W/S Scheme under Serampore Sub-Division of Hooghly Division, P.H.E. Dte. |
000075ORD/000805/2023-202 |
ORD/000805/2023-2024 |
589/HUG |
22/02/2024 |
1 |
6.72 |
Bilaspur Piped Water Supply Scheme. (SM/09825) |
6.72 |
6.72 |
59 |
Hooghly Division |
BAKSHI ENTERPRISE |
Laying of Balance portion of Additional Pipeline including other allied works at Borhal Mouza in Bilaspur W/S Scheme under Serampore Sub-Division of Hooghly Division, P.H.E. Dte. |
000075ORD/000806/2023-202 |
ORD/000806/2023-2024 |
590/HUG |
22/02/2024 |
1 |
10.02 |
Bilaspur Piped Water Supply Scheme. (SM/09825) |
10.02 |
10.02 |
60 |
Hooghly Division |
M/S S & P CONSTRUCTION |
Laying of Balance portion of Additional Pipeline including other allied works within leftout mouzas at Champadanga Water Supply Scheme Under Chandannagar Sub-Division under Hooghly Division, P.H.E Dte . |
000075ORD/000809/2023-202 |
ORD/000809/2023-2024 |
598/HUG |
22/02/2024 |
1 |
18.16 |
Augmentation of Champadanga Water Supply Scheme (SM/10005) |
18.16 |
18.16 |
61 |
Hooghly Division |
DAS ENTERPRISE (SAMIR DAS) |
REFAITPUR ZONE-II Piped Water Supply Scheme with Sinking of tube-well, LDS, Rising Main, FHTC, Construction of 150 cum capacity RCC OHR with 20.0 mtr. with Staging height including soil investigation & construction of switch-rooms & boundary walls at dif |
000075ORD/000810/2022-202 |
ORD/000810/2022-2023 |
975/Hug |
31/03/2023 |
1 |
20.84 |
REFAITPUR (ZONE-II) PIPED W/S SCHEME UNDER CHINSURAH MAGRA BLOCK (SM/15251) |
20.84 |
20.84 |
62 |
Hooghly Division |
ANIRUDDHA FARUQUE |
Sinking of 3rd tube-well by D.R. Rig method, Construction of 3.6 m X 3.0 m Switch Room with Sanitary and Water Supply arrangement, Construction of Boundary Wall, Laying rising main pipe for inter connection between Proposed T.W & Distribution of KHANAKUL |
000075ORD/000813/2023-202 |
ORD/000813/2023-2024 |
596/HUG |
22/02/2024 |
1 |
13.16 |
Augmentation Of Piped Water Supply Scheme For KHANAKUL (SM/18645) |
13.16 |
13.16 |
63 |
Hooghly Division |
SPG ENTERPRISES |
Sinking of 4 nos. tube-well (300 X 200 mm) by D.R. Rig method at HIRAPUR Z-I, CHINRA (Z-I AND II), ROUTHKHANA Piped Water Supply Scheme under ARAMBAGH Sub-Division of Hooghly Division P.H.E. Dte. |
000075ORD/000841/2023-202 |
ORD/000841/2023-2024 |
721/HUG |
05/03/2024 |
1 |
57.04 |
GROUND WATER BASED CHINRA (ZONE-I) PIPED WATER SUPPLY SCHEME IN KHANAKUL-II BLOCK UNDER HOOGHLY, HOOGHLY DISTRICT (SM/13325) |
28.52 |
28.52 |
64 |
Hooghly Division |
SPG ENTERPRISES |
Sinking of 4 nos. tube-well (300 X 200 mm) by D.R. Rig method at HAYATPUR and ARUNDA Z-I Piped Water Supply Scheme under ARAMBAGH Sub-Division of Hooghly Division P.H.E. Dte. |
000075ORD/000843/2023-202 |
ORD/000843/2023-2024 |
723/HUG |
05/03/2024 |
1 |
28.87 |
Hayatpur Piped Water Supply Scheme, Block-Khanakul-II, District-Hooghly. (SM/18345) |
28.87 |
28.87 |
65 |
Hooghly Division |
GARHBETA - I UNEMPLOYED YOUTH |
Sinking of 4 (Four) Nos tube well (250 mm X 150 mm) with supply of PVC Pipe and strainer and having depth upto 180 M at CHINRA Z-II and ARUNDA Z-II W/S Scheme under Arambagh Sub-Division of Hooghly Division, P.H.E. Dte. |
000075ORD/000849/2023-202 |
ORD/000849/2023-2024 |
726/HUG |
05/03/2024 |
1 |
9.57 |
GROUND WATER BASED ARUNDA (ZONE-II) PIPED WATER SUPPLY SCHEME IN KHANAKUL-I BLOCK UNDER HOOGHLY DIVISION, DISTRICT HOOGHLY (SM/15792) |
9.57 |
9.57 |
66 |
Hooghly Division |
AMBIAN INFRASTRUCTURE |
Laying Distribution of left out portion of pipeline to restore the water supply at Chikrand Jalapara & Bankagacha (part) and other allied works at Chikrand (Zone-I) Water Supply Scheme within Chanditala-II Block under Serampore Sub-Division of Hooghly Div |
000075ORD/000863/2023-202 |
ORD/000863/2023-2024 |
746/HUG |
05/03/2024 |
1 |
9.41 |
Source Augmentation of CHIKRAND ZONE-I Piped Water Supply Scheme by installing Two (2) nos. Tube Wells including Connection with Distribution, Switch Room and other allied work to meet up the additional water demand induced after execution of FHTC by loca (SM/18966) |
9.41 |
9.41 |
67 |
Hooghly Division |
SURAJIT SINGHA RAY |
Providing Functional Household Tap Connection (FHTC) within left out habitation of various Mouzas in Antpur W/S Scheme under
Serampore Sub-Division of Hooghly Division, P.H.E. Dte |
000075ORD/000906/2023-202 |
ORD/000906/2023-2024 |
829/HUG |
11/03/2024 |
1 |
30.4 |
RETROFITTING WORKS FOR PROVIDING FHTC WITHIN THE COMMAND AREA OF ANTPUR WATER SUPPLY SCHEME (SM/12000) |
30.4 |
30.4 |
68 |
Hooghly Division |
BASU & SONS |
Restoration & repairing of village road damaged due to laying of pipeline of piped water supply schemes under JJM in HARIT GP of POLBA-DADPUR Block |
000075ORD/000924/2023-202 |
ORD/000924/2023-2024 |
244/CH |
12/03/2024 |
1 |
4.97 |
AUGMENTATION OF HARIT PIPED W/S SCHEME UNDER POLBA DADPUR BLOCK (SM/15243) |
4.97 |
4.97 |
69 |
Hooghly Division |
R.K. TRADERS |
Restoration & repairing of village road damaged due to laying of pipeline of piped water supply schemes under JJM in POLBA GP of POLBA-DADPUR Block. |
000075ORD/000925/2023-202 |
ORD/000925/2023-2024 |
245/CH |
12/03/2024 |
1 |
4.96 |
Augmentation of Polba Water Supply Scheme (SM/10468) |
4.96 |
4.96 |
70 |
Hooghly Division |
M/S BIMAL DAS AND CO. |
Construction of Store room for temporary Chlorine and maintenance material storage For Dasghara Zone-I, Bishnupur and Shrirampur Piped Water Supply under Chinsurah Sub-Division under Hooghly Division, PHE Dte. |
000075ORD/001034/2023-202 |
ORD/001034/2023-2024 |
277/CH |
14/03/2024 |
1 |
0.95 |
BISHNUPUR W/S SCHEME UNDER DHANIAKHALI BLOCK (SM/12263) |
0.95 |
0.95 |
71 |
Hooghly Division |
BIMAL KUMAR HALDER |
Providing FHTC at the left out portions of Choto Khejuria for proiving FHTC in Saptagram Piped Water Supply Scheme under Chinusrah-Magra Block of Chinsurah Sub-Division under Hooghly Division, PHE Dte. |
000075ORD/001040/2023-202 |
ORD/001040/2023-2024 |
282/CH |
14/03/2024 |
1 |
0.96 |
SOURCE AUGMENTATION OF SAPTAGRAM PIPED W/S SCHEME UNDER CHINSURAH MAGRA BLOCK (SM/13409) |
0.96 |
0.96 |
72 |
Hooghly Division |
DAS ENTERPRISE (SAMIR DAS) |
Providing FHTC in rest out portion of at Kelor Para of Harit PWSS under Chinsurah Sub Division under Hooghly Division PHE Dte. |
000075ORD/001042/2023-202 |
ORD/001042/2023-2024 |
284/CH |
14/03/2024 |
1 |
0.97 |
AUGMENTATION OF HARIT PIPED W/S SCHEME UNDER POLBA DADPUR BLOCK (SM/15243) |
0.97 |
0.97 |
73 |
Hooghly Division |
DAS ENTERPRISE (SAMIR DAS) |
Providing FHTC in rest out portion of at Majher Para of Harit PWSS under Chinsurah Sub Division under Hooghly Division PHE Dte. |
000075ORD/001043/2023-202 |
ORD/001043/2023-2024 |
287/CH |
15/03/2024 |
1 |
0.98 |
AUGMENTATION OF HARIT PIPED W/S SCHEME UNDER POLBA DADPUR BLOCK (SM/15243) |
0.98 |
0.98 |
74 |
Hooghly Division |
DAS ENTERPRISE (SAMIR DAS) |
Providing FHTC in rest out portion of at Ichapur of Harit PWSS under Chinsurah Sub Division under Hooghly Division PHE Dte. |
000075ORD/001044/2023-202 |
ORD/001044/2023-2024 |
288/CH |
15/03/2024 |
1 |
0.79 |
AUGMENTATION OF HARIT PIPED W/S SCHEME UNDER POLBA DADPUR BLOCK (SM/15243) |
0.79 |
0.79 |
75 |
Hooghly Division |
NOBLE ENGINEERS CO-OPERATIVE S |
Providing FHTC in rest out portion of at Chatterjee Bagan of Dharampur PWSS under Chinsurah Sub Division under Hooghly Division PHE Dte. |
000075ORD/001045/2023-202 |
ORD/001045/2023-2024 |
289/CH |
15/03/2024 |
1 |
0.95 |
RETROFITTING WORKS OF DHARAMPUR PWSS FOR PROVIDING 1600 NOS. FUNCTIONAL HOUSEHOLD TAP CONNECTION (FHTC) WITHIN COMMAND AREA OF THE SCHEME UNDER HOOGHLY DIVISION PHE DTE. (SM/13356) |
0.95 |
0.95 |
76 |
Hooghly Division |
NOBLE ENGINEERS CO-OPERATIVE S |
Providing FHTC in rest out portion of at Maynadanga of Dharampur PWSS under Chinsurah Sub Division under Hooghly Division PHE Dte. |
000075ORD/001046/2023-202 |
ORD/001046/2023-2024 |
290/CH |
15/03/2024 |
1 |
0.95 |
RETROFITTING WORKS OF DHARAMPUR PWSS FOR PROVIDING 1600 NOS. FUNCTIONAL HOUSEHOLD TAP CONNECTION (FHTC) WITHIN COMMAND AREA OF THE SCHEME UNDER HOOGHLY DIVISION PHE DTE. (SM/13356) |
0.95 |
0.95 |
77 |
Hooghly Division |
RAJMAHAL ENTERPRISE |
Providing FHTC in rest out portion of at Radhanagar of Gopinagar PWSS under Chinsurah Sub Division under Hooghly Division PHE Dte. |
000075ORD/001048/2023-202 |
ORD/001048/2023-2024 |
292/CH |
15/03/2024 |
1 |
0.93 |
Retrofitting work for Providing Functional Household Tap Connection (FHTC) within the uncovered portion of Gopinagar Water Supply Scheme Under Dhaniakhali Block (SM/18109) |
0.93 |
0.93 |