1 |
Alipore Division |
RAJKUMAR MANNA |
Hiring of Motor Launch for Kakdwip Sub Division of Alipore Division, PHE Dte. (01.06.2022 to 31.08.2022) |
000008 |
|
698/KSD |
26/11/2021 |
2 |
36.21 |
Retrofitting of distribution system for Providing Functional Household Tap Connection (FHTC) to all the households for 10 (Ten) nos. habitation in connection with Jal Jeevan Mission (JJM) and Jal Swapna for Bishnupur Water Supply Scheme including one yea (SM/09358) |
36.21 |
6.51 |
2 |
Alipore Division |
K.P. CONSTRUCTION |
Augmentation of laying distribution system including construction of 1000 cum capacity of OHR to extend the benefit of 100% household by Providing Functional Household Tap Connection (FHTC) from distribution system with allied works in Zone-I at Paschi |
000008ORD/000017/2023-202 |
ORD/000017/2023-2024 |
58/AD |
10/04/2023 |
1 |
276.76 |
AUGMENTATION IN DISTRIBUTION SYSTEM WITH CONSTRUCTION OF OHR & ALLIED WORKS TO EXTEND THE BENEFIT OF 100% HOUSEHOLDS BY PROVIDING FHTC UNDER ZONE-I OF DIAMOND HARBOUR-II BLOCK WITHIN 'MEGA SURFACE WATER BASED WATER SUPPLY SCHEME FOR FALTA-MATHURAPUR, DIST (SM/15532) |
276.76 |
0 |
3 |
Alipore Division |
TANMAY ROY CHOWDHURY |
Construction of 300 m³ capacity R.C.C OHR (based on Departmental Design &. Drawing) with 20 mtr. staging height, Laying Distribution System, Providing Functional Household Tap Connection etc. for augmentation of Sadhupur (Zone-II) piped water supply sc |
000008ORD/000023/2023-202 |
ORD/000023/2023-2024 |
150/AD |
18/04/2023 |
1 |
117.41 |
AUGMENTATION AND RETROFITTING OF SADHUPUR (ZONE-II) PWSS FOR PROVIDING FHTC, BLOCK - GOSABA (SM/15563) |
117.41 |
0 |
4 |
Alipore Division |
M N J ENTERPRISES |
Construction of 350 m³ capacity R.C.C OHR (based on Departmental Design &. Drawing) with 20 mtr. staging height, Laying Distribution System, Providing Functional Household Tap Connection etc. for augmentation of Purba Radhanagar (Zone-II) piped water su |
000008ORD/000031/2023-202 |
ORD/000031/2023-2024 |
124/AD |
13/04/2023 |
1 |
83.2 |
AUGMENTATION AND RETROFITTING OF PURBA RADHANAGAR (ZONE-II) PWSS FOR PROVIDING FHTC, BLOCK - GOSABA (SM/15969) |
83.2 |
0 |
5 |
Alipore Division |
PATHIK PABAN NANDI |
Construction of 150 m³ capacity 20 M. staging height R.C.C. Over Head Water Reservoir, Laying distribution system & Providing FHTC etc of Ground Water Based Augmentation Piped W/S Scheme for Satjelia (Zone-II) Block - Gosaba under Canning Sub-Division of |
000008ORD/000039/2023-202 |
ORD/000039/2023-2024 |
1289/AD |
06/07/2023 |
1 |
178.32 |
AUGMENTATION AND RETROFITTING OF SATJELIA (ZONE-II) PWSS FOR PROVIDING FHTC, BLOCK - GOSABA (SM/15973) |
178.32 |
0 |
6 |
Alipore Division |
ADITYA HAZRA |
Construction of OHR (100 Cum), Laying of Distribution System, Providing Functional Household Tap Connection etc. of Ground Water based Augmentation Piped Water Supply Scheme for the JELEPARA, Block-Gosaba under Canning Sub-Division of Alipore Division, P |
000008ORD/000060/2023-202 |
ORD/000060/2023-2024 |
310/AD |
26/04/2023 |
1 |
74.57 |
GROUND WATER BASED JELEPARA PIPED WATER SUPPLY SCHEME UNDER ALIPORE DIVISION BLOCK-GOSABA DISTRICT-SOUTH 24 PARGANAS (SM/13836) |
74.57 |
0 |
7 |
Alipore Division |
JAL PRAVAHIKA PVT. LTD. |
Providing FHTC including distribution system and other allied works at Zone- IX of Mathurapur -II Block for ¿Mega Surface water based water supply scheme for Falta-Mathurapur, District South 24 parganas¿ in connection with Jal Jeevan Mission (JJM) under |
000008ORD/000085/2023-202 |
ORD/000085/2023-2024 |
213/AD |
20/04/2023 |
1 |
36.11 |
AUGMENTATION OF DISTRIBUTION SYSTEM UNDER ZONE-IX, MATHURAPUR-II BLOCK FOR PROVIDING FHTC TO ALL THE HOUSEHOLDS I/C/W JJM UNDER MEGA SURFACE WATER BASED W/S/S FOR FALTA-MATHURAPUR UNDER ALIPORE DIVISION, PHE DTE. (SM/15492) |
36.11 |
0 |
8 |
Alipore Division |
M/S B.N.ENTERPRISE |
Providing FHTC including laying distribution system and other allied works at Zone- XI of Mathurapur -II Block for ''Mega Surface water based water supply scheme for Falta-Mathurapur, District South 24 parganas¿ in connection with Jal Jeevan Mission (JJ |
000008ORD/000088/2023-202 |
ORD/000088/2023-2024 |
499/AD |
11/05/2023 |
1 |
72.83 |
AUGMENTATION OF DISTRIBUTION SYSTEM UNDER ZONE-XI, MATHURAPUR-II BLOCK FOR PROVIDING FHTC TO ALL THE HOUSEHOLDS I/C/W JJM UNDER MEGA SURFACE WATER BASED W/S/S FOR FALTA-MATHURAPUR UNDER ALIPORE DIVISION, PHE DTE. (SM/15491) |
72.83 |
0 |
9 |
Alipore Division |
ELECTRICAL & MECHANICAL ENGINE |
Supply, installation and commissioning of submersible pumping machinery along with allied accessories at P.H. 4 of Bayarsing water supply scheme under South 24 Pgs. Mechanical Division, PHE Dte. [Block: Canning-I] |
000008ORD/000109/2023-202 |
ORD/000109/2023-2024 |
1241/SMD |
10/05/2023 |
1 |
10.27 |
Bayarsing Piped Water Supply Scheme. (SM/06025) |
10.27 |
0 |
10 |
Alipore Division |
NAUTAN DAS AND CO |
Laying Distribution System, Providing Functional Household Tap Connection for Ground Water Based Augmentation Piped Water Supply Scheme for Bibir Abad, Block-Canning-II under Canning Sub-Division of Alipore Division, PHE Dte. [No. of FHTC = 1703] |
000008ORD/000122/2023-202 |
ORD/000122/2023-2024 |
158/AD |
18/04/2023 |
1 |
46.66 |
GROUND WATER BASED BIBIR ABAD PIPED WATER SUPPLY SCHEME UNDER ALIPORE DIVISION, PHE DTE,BLOCK-CANNING-II, DISTRICT- SOUTH 24 PARGANAS (SM/13975) |
46.66 |
0 |
11 |
Alipore Division |
M N J ENTERPRISES |
Construction of 350 m³ capacity R.C.C OHR (based on Departmental Design &. Drawing) with 20 mtr. staging height, Laying Distribution System, Providing Functional Household Tap Connection etc. for augmentation of Purba Radhanagar (Zone-III) piped water s |
000008ORD/000133/2023-202 |
ORD/000133/2023-2024 |
757/AD |
23/05/2023 |
1 |
45.09 |
AUGMENTATION & RETROFITTING OF PURBA RADHANAGAR (ZONE-III) PWSS FOR PROVIDING FUNCTIONAL HOUSEHOLD TAP CONNECTION (FHTC) (SM/15974) |
45.09 |
0 |
12 |
Alipore Division |
SUPRITI ENTERPRISE |
Providing Functional Household Tap Connection (FHTC) at Lahiripur W/S Scheme (uncovered area), Block-Gosaba under Canning Sub-Division of Alipore Division, PHE Dte. |
000008ORD/000219/2023-202 |
ORD/000219/2023-2024 |
1024/AD |
13/06/2023 |
1 |
19.38 |
Lahiripur Piped Water Supply Scheme (SM/06046) |
19.38 |
0 |
13 |
Alipore Division |
ADARSH ENTERPRISES |
Construction of 150 m³ capacity 20 M. staging height R.C.C. Over Head Water Reservoir, Laying distribution system & Providing FHTC etc of Ground Water Based Augmentation of Piped W/S Scheme for Amtali (Zone-II) Block - Gosaba under Canning Sub-Division o |
000008ORD/000260/2023-202 |
ORD/000260/2023-2024 |
1448/AD |
13/07/2023 |
1 |
84.1 |
AUGMENTATION OF GROUND WATER BASED AMTALI (ZONE-I & II), PIPED WATER SUPPLY SCHEME UNDER ALIPORE DIVISION, BLOCK-GOSABA,DISTRICT-SOUTH 24 PARGANAS (SM/14120) |
84.1 |
0 |
14 |
Alipore Division |
GARGO TRADERS |
Allied works for pile and pile cap portion regarding the construction of 400 cum. capacity 20 mtr. staging height R.C.C. Over Head Reservoir as per departmental design, drawing & specification including R.C.C. Bored pile & pile cap upto pedestal at Heram |
000008ORD/000276/2023-202 |
ORD/000276/2023-2024 |
1426/AD |
13/07/2023 |
1 |
34.54 |
AUGMENTATION OF GROUND WATER BASED HERAMBAGOPALPUR PWSS TO ACCOMMODATE FHTC IN PATHARPRATIMA BLOCK UNDER KAKDWIP SUB-DIVISION OF ALIPORE DIVISION, PHE DTE IN SOUTH 24 PARGANAS DISTRCT (SM/10480) |
34.54 |
0 |
15 |
Alipore Division |
JYOTY SOLAR POWER |
Construction of 350 m³ capacity R.C.C OHR (based on Departmental Design &. Drawing) with 20 mtr. staging height, Laying Distribution System, Providing Functional Household Tap Connection etc. for augmentation of Purba Radhanagar (Zone-I) piped water sup |
000008ORD/000292/2023-202 |
ORD/000292/2023-2024 |
1502/AD |
15/07/2023 |
1 |
91.47 |
Augmentation & Retrofitting of Purba Radhanagar (Zone- I) PWSS for Providing (FHTC) , Block - Gosaba (SM/15966) |
91.47 |
0 |
16 |
Alipore Division |
CHAKRABORTTI ENTERPRISE |
Construction of 100 m³ capacity R.C.C OHR (based on Departmental Design &. Drawing) with 20 mtr. staging height, Laying Distribution System, Providing Functional Household Tap Connection etc. for augmentation of Gopalkata piped water supply scheme of G |
000008ORD/000295/2023-202 |
ORD/000295/2023-2024 |
3732/AD |
03/11/2023 |
1 |
71.23 |
GROUND WATER BASED GOPALKATA PIPED WATER SUPPLY SCHEME, UNDER ALIPORE DIVISION, BLOCK : GOSABA, DISTRICT : SOUTH 24 PARGANAS (SM/13834) |
71.23 |
0 |
17 |
Alipore Division |
ALOK ENTERPRISE (A UNIT OF SAK |
Construction of OHR (400 Cum), Laying of Distribution System, Providing Functional Household Tap Connection etc. of Ground Water based Augmentation Piped Water Supply Scheme for the KUMIRMARI (ZONE-I), Block-Gosaba under Canning Sub-Division of Alipore D |
000008ORD/000309/2023-202 |
ORD/000309/2023-2024 |
3737/AD |
03/11/2023 |
1 |
144.97 |
AUGMENTATION OF KUMIRMARI (ZONE-I) PIPED WATER SUPPLY SCHEME, BLOCK-GOSABA,DISTRICT-SOUTH 24 PARGANAS (SM/18285) |
144.97 |
0 |
18 |
Alipore Division |
M N J ENTERPRISES |
Laying of Distribution Systemof Ground Water Based Augmentation Piped Water Supply Scheme for Matherdighi (Zone-II), Block-Canning-II under Canning Sub-Division of Alipore Division, PHE Dte.(TSM/016448) |
000008ORD/000361/2023-202 |
ORD/000361/2023-2024 |
1562/AD |
17/07/2023 |
1 |
59.91 |
AUGMENTATION OF GROUND WATER BASED MATHER DIGHI (ZONE-I,II & III) PIPED WATER SUPPLY SCHEME UNDER ALIPORE DIVISION, PHE DTE,BLOCK-CANNING-II,DISTRICT-SOUTH 24 PARGANAS (SM/18280) |
59.91 |
0 |
19 |
Alipore Division |
ASTER CONSULTANCY |
Preparation of design, drawing for fundation of different capacities for the proposed R.C.C. Over Head Reservoir at (Zone IX, OHR Size-450 Cum. Mouza - Karanjali ) of Kulpi Block and at Moukhali W/S Scheme (OHR Size-350 Cum., Mouza - Moukhali) of Budge Bu |
000008ORD/000365/2022-202 |
ORD/000365/2022-2023 |
198/DHSD |
27/07/2022 |
1 |
1 |
AUGMENTATION OF LAYING DISTRIBUTION SYSTEM INCLUDING OHR WITH ALLIED WORKS TO EXTEND THE BENEFIT OF 100% HOUSEHOLDS BY PROVIDING FHTC UNDER ZONE-IX OF KULPI BLOCK WITHIN 'MEGA SURFACE WATER BASED WATER SUPPLY SCHEME FOR FALTA-MATHURAPUR, DISTRICT-SOUTH 24 (SM/18551) |
1 |
0 |
20 |
Alipore Division |
S.R.ENTERPRISE |
Laying of Distribution System, Providing Functional Household Tap Connection (FHTC) etc. of Ground Water Based Augmentation Piped Water Supply Scheme for Matherdighi (Zone-III), Block-Canning-II under Canning Sub-Division of Alipore Division, PHE Dte. [No |
000008ORD/000368/2023-202 |
ORD/000368/2023-2024 |
1569/AD |
17/07/2023 |
1 |
34.21 |
AUGMENTATION OF GROUND WATER BASED MATHER DIGHI (ZONE-I,II & III) PIPED WATER SUPPLY SCHEME UNDER ALIPORE DIVISION, PHE DTE,BLOCK-CANNING-II,DISTRICT-SOUTH 24 PARGANAS (SM/18280) |
34.21 |
0 |
21 |
Alipore Division |
SPA ENTERPRISE |
Augmentation of laying distribution system including providing of Functional Household Tap Connection (FHTC) with allied works in Zone-VIII of Diamond Harbour-II block within Mega Surface Water Based Water Supply Scheme for Falta- Mathurapur under Diamo |
000008ORD/000372/2023-202 |
ORD/000372/2023-2024 |
1767/AD |
27/07/2023 |
1 |
155.44 |
AUGMENTATION OF LAYING DISTRIBUTION SYSTEM WITH ALLIED WORKS FOR PROVIDING FHTC TO EXTEND THE BENEFIT OF 100% HOUSEHOLDS AT ZONE-VIII OF DIAMOND HARBOUR-II BLOCK WITHIN 'MEGA SURFACE WATER BASED WATER SUPPLY SCHEME FOR FALTA-MATHURAPUR, DISTRICT-SOUTH 24 (SM/15530) |
155.44 |
0 |
22 |
Alipore Division |
SWASTIK CONSTRUCTION |
Laying distribution system for providing Functional Household Tap Connection (FHTC) to all households for Augmentation of Ganeshpur Kalinagar Water Supply Scheme, Block - Kakdwip for implementation of JJM under Kakdwip Sub-Division of Alipore Division, |
000008ORD/000382/2023-202 |
ORD/000382/2023-2024 |
1775/AD |
26/07/2023 |
1 |
12.23 |
AUGMENTATION OF GANESHPUR KALINAGAR PWSS FOR PROVIDING FUNCTIONAL HOUSEHOLD TAP CONNECTION (FHTC) (SM/10336) |
12.23 |
0 |
23 |
Alipore Division |
M/S P. B. CONSTRUCTION |
Hiring of an Inspection Vehicle (Diesel Operated with Luxury Permit) for use of the Executive Engineer, Alipore Division, PHE Dte. for the period from 01.07.2023 to 31.12.2023. (December'23) |
000008ORD/000397/2023-202 |
ORD/000397/2023-2024 |
102/HQ-II/ |
28/06/2023 |
1 |
0.4 |
AUGMENTATION FOR GROUND WATER BASED TAKTIPUR ABAD (ZONE - I & II), PIPED WATER SUPPLY SCHEME Phase-B, UNDER ALIPORE DIVISION, BLOCK : KAKDWIP, DISTRICT : SOUTH 24 PARGANAS (SM/11876) |
0.4 |
0 |
24 |
Alipore Division |
FORTUNE ENGINEERING |
Sinking of 01 No. 250mm x 150mm dia. 360 mtr. deep Tubewell by D.R. Rig method using UPVC Pipe & Pre-packed Resin Bonded Gravel Filter for Khas Ramkarchar (Phase-B) W/S Scheme, Block - Sagar for implementation of JJM under Kakdwip Sub-Division of Alipore |
000008ORD/000418/2023-202 |
ORD/000418/2023-2024 |
1907/AD |
01/08/2023 |
1 |
22.39 |
Retrofitting of Distribution System for Providing Functional Household Tap Connection (FHTC) to the households for 4 (four) nos. habitation of all the households in connection with Jal Jeevan Mission (JJM) and Jal Swapna for Khasramkarerchhar W/S Scheme i (SM/07756) |
22.39 |
0 |
25 |
Alipore Division |
M/S.SREEJIT ENTERPRISE |
Laying distribution system, Functional Household Tap Connection (FHTC) to all households for Augmentation of Srinagar Zone - I & II Water Supply Scheme, Block - Kakdwip for implementation of JJM under Kakdwip Sub-Division of Alipore Division, P.H.E. Dte. |
000008ORD/000427/2023-202 |
ORD/000427/2023-2024 |
1915/AD |
01/08/2023 |
1 |
10.42 |
AUGMENTATION OF GROUND WATER BASED SRINAGAR (ZONE - I & II), PIPE WATER SUPPLY SCHEME Phase-B, UNDER ALIPORE DIVISION, BLOCK : KAKDWIP, DISTRICT : SOUTH 24 PARGANAS (SM/13811) |
10.42 |
0 |
26 |
Alipore Division |
KAR CONSTRUCTION AND ORDER SUP |
Sinking of 01 (one) No. 250mm x 150mm dia. 360 mtr. deep Replacement Tubewell (Pump House No. 3) by Direct Rotary Rig Method using P.V.C pipe and pre-packed Resin Bonded Gravel Filter for Augmentation of Raidighi W/S Scheme (Zone-V, Mathurapur-II Block) i |
000008ORD/000430/2023-202 |
ORD/000430/2023-2024 |
1918/AD |
01/08/2023 |
1 |
19.23 |
AUGMENTATION OF DISTRIBUTION SYSTEM UNDER ZONE-V, MATHURAPUR-II BLOCK FOR PROVIDING FHTC TO ALL THE HOUSEHOLDS IN CONNECTION WITH JAL JEEVAN MISSION UNDER MEGA SURFACE BASED WATER SUPPLY CSHEME FOR FALTA MATHURAPUR UNDER ALIPORE DIVISION PHE DTE. (SM/15508) |
19.23 |
0 |
27 |
Alipore Division |
ALISHA ENTERPRISE |
Sinking of 01 (one) No. 250mm x 150mm dia. 360 mtr. deep Replacement Tubewell (Pump House No. 2) by Direct Rotary Rig Method using P.V.C pipe and pre-packed Resin Bonded Gravel Filter for Augmentation of Uttar Laxminarayanpur W/S Scheme (Zone-IX, Mathurap |
000008ORD/000433/2023-202 |
ORD/000433/2023-2024 |
1921/AD |
01/08/2023 |
1 |
19.27 |
AUGMENTATION OF DISTRIBUTION SYSTEM OF ZONE-IX, MATHURAPUR-I BLOCK FOR PROVIDING FUNCTIONAL HOUSEHOLD TAP CONNECTION (FHTC) IN CONNECTION WITH JAL JEEVAN MISSION (JJM) UNDER MEGA SURFACE WATER BASED WATER SUPPLY SCHEME FOR FALTA-MATHURAPUR UNDER ALIPORE D (SM/15481) |
19.27 |
0 |
28 |
Alipore Division |
A.R.CONSTRUCTION |
Construction of switch room cum chlorine room (5.4m x 3.6m) including Sanitary arrangement as per departmental drawing at the site of Narayangar (Part-B) W/S Scheme, Block - Canning-I under Canning Sub-Division of Alipore Division, PHE Dte. [Pump House-I |
000008ORD/000466/2023-202 |
ORD/000466/2023-2024 |
1928/AD |
01/08/2023 |
1 |
6.57 |
AUGMENTATION OF NARAYANGAR (PART-B) PIPED WATER SUPPLY SCHEME, BLOCK : CANNING-I, DISTRICT : SOUTH 24 PARGANAS (SM/15961) |
6.57 |
0 |
29 |
Alipore Division |
A.R.CONSTRUCTION |
Construction of switch room cum chlorine room (4.88m x 3.66m) including Sanitary arrangement as per departmental drawing at the site of Narayangar (Part-B) W/S Scheme, Block - Canning-I under Canning Sub-Division of Alipore Division, PHE Dte. [Pump Hous |
000008ORD/000467/2023-202 |
ORD/000467/2023-2024 |
1929/AD |
01/08/2023 |
1 |
6.28 |
AUGMENTATION OF NARAYANGAR (PART-B) PIPED WATER SUPPLY SCHEME, BLOCK : CANNING-I, DISTRICT : SOUTH 24 PARGANAS (SM/15961) |
6.28 |
0 |
30 |
Alipore Division |
M/S GHOSH & CO. |
Construction of 900 M3 capacity 20 M. staging height R.C.C. Over Head Water Reservoir, Providing FHTC including distribution system, boundary wall and other allied works at Zone- II of Mathurapur -II Block for ¿Mega Surface water based water supply schem |
000008ORD/000480/2023-202 |
ORD/000480/2023-2024 |
3670/AD |
01/11/2023 |
1 |
162.46 |
AUGMENTATION OF DISTRIBUTION SYSTEM INCLUDING OHR WITH ALLIED WORKS UNDER ZONE-II, MATHURAPUR-II BLOCK FOR PROVIDING FHTC TO ALL THE HOUSEHOLDS I/C/W JJM UNDER MEGA SURFACE WATER BASED W/S/S FOR FALTA-MATHURAPUR UNDER ALIPORE DIVISION, PHE DTE. (SM/18379) |
162.46 |
0 |
31 |
Alipore Division |
MATRI ENTERPRISE |
Construction of 700 M3 capacity 20 M. staging height R.C.C. Over Head Water Reservoir, Providing FHTC including distribution system, boundary wall and other allied works at Zone- VII, Mathurapur-II Block (Part-A) for ¿Mega Surface water based water suppl |
000008ORD/000481/2023-202 |
ORD/000481/2023-2024 |
1994/AD |
04/08/2023 |
1 |
168.51 |
AUGMENTATION OF DISTRIBUTION SYSTEM INCLUDING OHR WITH ALLIED WORKS UNDER ZONE-VII, MATHURAPUR-II BLOCK FOR PROVIDING FHTC TO ALL THE HOUSEHOLDS IN CONNECTION WITH JAL JEEVAN MISSION UNDER MEGA SURFACE BASED WATER SUPPLY CSHEME FOR FALTA MATHURAPUR UNDER (SM/18377) |
168.51 |
0 |
32 |
Alipore Division |
ASHIS ENTERPRISE |
Construction of switch room cum chlorine room (4.88m x 3.66m) including Sanitary arrangement as per departmental drawing at the site of Augmentation of Kalaria W/S Scheme (Zone-IB), Block - Canning-I under Canning Sub-Division of Alipore Division, PHE Dte |
000008ORD/000523/2023-202 |
ORD/000523/2023-2024 |
2077/AD |
07/08/2023 |
1 |
6.86 |
AUGMENTATION OF KALARIA (ZONE-IA & IB) PIPED WATER SUPPLY SCHEME, BLOCK-CANNING-I,DISTRICT-SOUTH 24 PARGANAS (SM/18676) |
6.86 |
0 |
33 |
Alipore Division |
SUPRITI ENTERPRISE |
Laying of Distribution System, Providing Functional Household Tap Connection (FHTC) etc. of Ground Water Based Augmentation Piped Water Supply Scheme for Kalaria (Zone-IB), Block-Canning-I under Canning Sub-Division of Alipore Division, PHE Dte. [No. of F |
000008ORD/000525/2023-202 |
ORD/000525/2023-2024 |
2141/AD |
09/08/2023 |
1 |
120.55 |
AUGMENTATION OF KALARIA (ZONE-IA & IB) PIPED WATER SUPPLY SCHEME, BLOCK-CANNING-I,DISTRICT-SOUTH 24 PARGANAS (SM/18676) |
120.55 |
0 |
34 |
Alipore Division |
M/S PIONEER CONSTRUCTION |
Construction of 2 nos. 250 cum. Over Head Reservoir (OHR), (20 mtr. Staging Height) along Laying distribution system, Rising Main, Functional Household Tap Connection (FHTC) to all households including design & drawing of pile foundation & pile cap after |
000008ORD/000543/2023-202 |
ORD/000543/2023-2024 |
2209/AD |
10/08/2023 |
1 |
33.89 |
AUGMENTATION OF GROUND WATER BASED GANGADHARPUR (ZONE - I & II), PIPE WATER SUPPLY SCHEME Phase-B, UNDER ALIPORE DIVISION, BLOCK : KAKDWIP, DISTRICT : SOUTH 24 PARGANAS (SM/11805) |
33.89 |
0 |
35 |
Alipore Division |
NATURAL RESOURCES CONSORTIUM |
Providing service by assigning Resource Person for a period of 3 months supervision of process of preparation for NABL recognition for Chemical Testing of potable water of Sub-District level Water Quality Testing Laboratory including supply, installation |
000008ORD/000555/2021-202 |
ORD/000555/2021-2022 |
870/CSD |
24/09/2021 |
1 |
0.33 |
Up-gradation of PHED & NGO Managed Laboratories under Water Quality Monitoring & Surveillance Programme for 2018-19 (SM/06349) |
0.33 |
0.33 |
36 |
Alipore Division |
M/S GHOSH & CO. |
Augmentation of laying distribution system including construction of 600 m3 capacity OHR to extend the benefit of 100% household by Providing Functional Household Tap Connection (FHTC) from distribution system in Zone-IX at Kulpi block within "Mega Surfa |
000008ORD/000561/2023-202 |
ORD/000561/2023-2024 |
3736/AD |
03/11/2023 |
1 |
44.14 |
AUGMENTATION OF LAYING DISTRIBUTION SYSTEM INCLUDING OHR WITH ALLIED WORKS TO EXTEND THE BENEFIT OF 100% HOUSEHOLDS BY PROVIDING FHTC UNDER ZONE-IX OF KULPI BLOCK WITHIN 'MEGA SURFACE WATER BASED WATER SUPPLY SCHEME FOR FALTA-MATHURAPUR, DISTRICT-SOUTH 24 (SM/18551) |
44.14 |
0 |
37 |
Alipore Division |
MEGA SOLAR ENERGY |
Sinking of 02 Nos. 250mm x 150mm dia. 360 mtr. deep Tubewell by D.R. Rig method using UPVC Pipe & Pre-packed Resin Bonded Gravel Filter at 1st and 2nd Tubewell Site of Dakshin Chandranagar Water Supply Scheme, Block - Namkhana for implementation of JJM u |
000008ORD/000574/2023-202 |
ORD/000574/2023-2024 |
1828/AD |
27/07/2023 |
1 |
36.64 |
DAKSHIN CHANDRANAGAR PIPED WATER SUPPLY SCHEME IN NAMKHANA BLOCK IN SOUTH 24 PARGANAS, WEST BENGAL UNDER ALIPORE DIVISION, PHE DTE. (SM/18394) |
36.64 |
0 |
38 |
Alipore Division |
M/S SAKTI GIRI ENTERPRISE |
Laying distribution system for providing Functional Household Tap Connection (FHTC) to all households for Bamanagar Water Supply Scheme, Block - Kakdwip for implementation of JJM under Kakdwip Sub-Division of Alipore Division, P.H.E. Dte. (Part-D) |
000008ORD/000575/2022-202 |
ORD/000575/2022-2023 |
5713/AD |
13/10/2022 |
1 |
9.87 |
GROUND WATER BASED BAMANAGAR PIPE WATER SUPPLY SCHEME UNDER ALIPORE DIVISION, BLOCK : KAKDWIP, DISTRICT : SOUTH 24 PARGANAS (SM/12733) |
9.87 |
0 |
39 |
Alipore Division |
M/S BANERJEE ENGINEERING SYSTE |
Laying distribution system, Functional Household Tap Connection (FHTC) to all households for Augmentation of Suryanagar (Zone-I & II) Water Supply Scheme, Block - Kakdwip for implementation of JJM under Kakdwip Sub-Division of Alipore Division, P.H.E. D |
000008ORD/000578/2022-202 |
ORD/000578/2022-2023 |
5716/AD |
13/10/2022 |
1 |
15.11 |
AUGMENTATION OF GROUND WATER BASED SURYANAGAR (ZONE - I & II), PIPE WATER SUPPLY SCHEME Phase-B, UNDER ALIPORE DIVISION, BLOCK : KAKDWIP, DISTRICT : SOUTH 24 PARGANAS (SM/12572) |
15.11 |
0 |
40 |
Alipore Division |
TANMAY ROY CHOWDHURY |
Laying distribution system, Functional Household Tap Connection (FHTC) to all households and Construction 02 nos. Pump House (5.40m. x 3.60m.) for Baliara Water Supply Scheme, Block - Namkhana for implementation of JJM under Kakdwip Sub-Division of Alipo |
000008ORD/000580/2023-202 |
ORD/000580/2023-2024 |
2267/AD |
14/08/2023 |
1 |
42.41 |
BALIARA PIPED WATER SUPPLY SCHEME IN NAMKHANA BLOCK IN SOUTH 24 PARGANAS, WEST BENGAL UNDER JAL JEEVAN MISSION UNDER KAKDWIP SUB-DIVISION OF ALIPORE DIVISION, PHE DTE. (SM/18392) |
42.41 |
0 |
41 |
Alipore Division |
M/S. BABUSONA ENTERPRISE |
Supply, installation and commissioning of submersible pumping machinery along with allied accessories at P.H. 1, of Khunkhali (Part-I) Mini piped water supply scheme under South 24 Pgs. Mechanical Division, PHE Dte. [Block: Canning-II] |
000008ORD/000582/2022-202 |
ORD/000582/2022-2023 |
617/SMD |
02/03/2023 |
1 |
3.35 |
AUGMENTATION OF GROUND WATER BASED MINI PIPED WATER SUPPLY SCHEME FOR KHUN KHALI (PART-I), UNDER ALIPORE DIVISION, PHE DTE., BLOCK : CANNING-II, DISTRICT : SOUTH 24 PARGANAS (SM/13584) |
3.35 |
0 |
42 |
Alipore Division |
M/S. BABUSONA ENTERPRISE |
Supply, installation and commissioning of submersible pumping machinery along with allied accessories at P.H. 1, of Khunkhali (Part-II) Mini piped water supply scheme under South 24 Pgs. Mechanical Division, PHE Dte. [Block: Canning-II] |
000008ORD/000583/2022-202 |
ORD/000583/2022-2023 |
640/SMD |
02/03/2023 |
1 |
6.73 |
AUGMENTATION OF GROUND WATER BASED MINI PIPED WATER SUPPLY SCHEME FOR KHUN KHALI (PART-II), UNDER ALIPORE DIVISION, PHE DTE., BLOCK : CANNING-II, DISTRICT : SOUTH 24 PARGANAS (SM/12746) |
6.73 |
0 |
43 |
Alipore Division |
SUDIP PRADHAN |
Supply, installation and commissioning of submersible pumping machinery along with allied accessories at P.H. 1, of Moukhali Kumarkhali (Part-II) Mini piped water supply scheme under South 24 Pgs. Mechanical Division, PHE Dte. [Block: Canning-II] |
000008ORD/000587/2022-202 |
ORD/000587/2022-2023 |
644/SMD |
02/03/2023 |
1 |
7.93 |
AUGMENTATION OF GROUND WATER BASED MINI PIPED WATER SUPPLY SCHEME FOR MAUKHALI KUMARKHALI (PART-II) UNDER ALIPORE DIVISION, PHE DTE, BLOCK: CANNING-II, DISTRICT : SOUTH 24 PARGANAS (SM/13575) |
7.93 |
0 |
44 |
Alipore Division |
B. P. CONSTRUCTION |
Supply, installation and commissioning of submersible pumping machinery along with allied accessories at P.H. 1, of Moukhali Kumarkhali (Part-III) Mini piped water supply scheme under South 24 Pgs. Mechanical Division, PHE Dte. [Block: Canning-II] |
000008ORD/000588/2022-202 |
ORD/000588/2022-2023 |
649/SMD |
03/03/2023 |
1 |
7.98 |
AUGMENTATION OF GROUND WATER BASED MINI PIPED WATER SUPPLY SCHEME FOR MAUKHALI KUMARKHALI (PART-III) UNDER ALIPORE DIVISION, PHE DTE, BLOCK: CANNING-II, DISTRICT : SOUTH 24 PARGANAS (SM/13577) |
7.98 |
0 |
45 |
Alipore Division |
SOMNATH ENTERPRISE |
Supply, installation and commissioning of submersible pumping machinery along with allied accessories at P.H. 1, of Tambul Daha (Part-I) Mini piped water supply scheme under South 24 Pgs. Mechanical Division, PHE Dte. [Block: Canning-II] |
000008ORD/000598/2022-202 |
ORD/000598/2022-2023 |
668/SMD |
09/03/2023 |
1 |
2.07 |
AUGMENTATION OF GROUND WATER BASED MINI PIPED WATER SUPPLY SCHEME FOR TAMBUL DAHA (PART - I) UNDER ALIPORE DIVISION, BLOCK : CANNING-II, DISTRICT : SOUTH 24 PARGANAS (SM/12744) |
2.07 |
0 |
46 |
Alipore Division |
M/S P. B. CONSTRUCTION |
Sinking of 150 X 100 mm dia. X 360 Mtr. Depth Rig bored Tube wells, Ground Water Recharge Structure of Tubewell, Construction of Switch Room (3750 x 2550), Construction of soak pit, pavement, boundary fencing, MS gate, land development, approach road, L |
000008ORD/000655/2022-202 |
ORD/000655/2022-2023 |
6677/AD |
14/11/2022 |
1 |
8.44 |
AUGMENTATION OF GROUND WATER BASED MINI PIPED WATER SUPPLY SCHEME FOR MAUKHALI KUMARKHALI (PART-I) UNDER ALIPORE DIVISION, PHE DTE, BLOCK: CANNING-II, DISTRICT : SOUTH 24 PARGANAS (SM/13576) |
8.44 |
0 |
47 |
Alipore Division |
KAR CONSTRUCTION AND ORDER SUP |
Augmentation of laying distribution system including construction of 600 cum capacity of OHR to extend the benefit of 100% household by Providing Functional Household Tap Connection (FHTC) from distribution system in Zone- X at Kuleswar of Diamond Harbo |
000008ORD/000674/2023-202 |
ORD/000674/2023-2024 |
2701/AD |
07/09/2023 |
1 |
96.57 |
AUGMENTATION FOR PROVIDING FUNCTIONAL HOUSEHOLD TAP CONNECTION (FHTC) FROM DISTRIBUTION SYSTEM WITH ALLIED WORKS TO EXTEND THE BENEFIT OF 100% HOUSEHOLD AT ZONE-X OF DIAMOND HARBOUR-I BLOCK WITHIN ' MEGA SURFACE WATER BASED WATER SUPPLY SCHEME FOR FALTA - (SM/15322) |
96.57 |
0 |
48 |
Alipore Division |
M/S SNEHALATA ENTERPRISE |
Laying distribution system for providing Functional Household Tap Connection (FHTC) to all households of Dakshin Durgapur Water Supply Scheme, Block - Namkhana for implementation of JJM under Kakdwip Sub-Division of Alipore Division, P.H.E. Dte. (Part-J) |
000008ORD/000711/2023-202 |
ORD/000711/2023-2024 |
2533/AD |
28/08/2023 |
1 |
7.83 |
DAKSHIN DURGAPUR & ADJOINING MOUZAS PIPED WATER SUPPLY SCHEME IN NAMKHANA BLOCK IN SOUTH 24 PARGANAS, WEST BENGAL UNDER JAL JEEVAN MISSION UNDER KAKDWIP SUB-DIVISION OF ALIPORE DIVISION PHE DTE. (SM/18684) |
7.83 |
0 |
49 |
Alipore Division |
FIDERE MARINE SERVICES PVT. LT |
Laying distribution system, Functional Household Tap Connection (FHTC) to all households for Augmentation of Sumatinagar (Zone-I & II) Water Supply Scheme, Block - Sagar for implementation of JJM under Kakdwip Sub-Division of Alipore Division, P.H.E. Dte |
000008ORD/000775/2022-202 |
ORD/000775/2022-2023 |
6647/AD |
14/11/2022 |
1 |
4.3 |
AUGMENTATION FOR GROUND WATER BASED SUMATINAGAR (ZONE - I & II) PIPE WATER SUPPLY SCHEME Phase-B, UNDER ALIPORE DIVISION, BLOCK : SAGAR, DISTRICT : SOUTH 24 PARGANAS (SM/13569) |
4.3 |
0 |
50 |
Alipore Division |
SUPRITI ENTERPRISE |
Construction of 300 cum. Over Head Reservoir (OHR), (20 mtr. Staging Height) along with 2 nos. Pump House, Laying distribution system, Rising Main, Functional Household Tap Connection (FHTC) to all households including design & drawing of pile foundation |
000008ORD/000783/2022-202 |
ORD/000783/2022-2023 |
6537/AD |
11/11/2022 |
1 |
80.02 |
GROUND WATER BASED HARENDRANAGAR PIPED WATER SUPPLY SCHEME, UNDER ALIPORE DIVISION, PHE DTE., BLOCK : KAKDWIP, DISTRICT : SOUTH 24 PARGANAS (SM/11849) |
80.02 |
0 |
51 |
Alipore Division |
CAMELIA CONSTRUCTION |
Sinking of 150 X 100 mm dia. X 360 Mtr. Depth Rig bored Tube wells, Ground Water Recharge Structure of Tubewell, Construction of Switch Room (3750 x 2550), Construction of soak pit, pavement, boundary fencing, MS gate, land development, approach road, La |
000008ORD/000786/2022-202 |
ORD/000786/2022-2023 |
6641/AD |
14/11/2022 |
1 |
6.8 |
AUGMENTATION OF GROUND WATER BASED MINI PIPED WATER SUPPLY SCHEME FOR MAUKHALI KUMARKHALI (PART-IV) UNDER ALIPORE DIVISION, PHE DTE, BLOCK: CANNING-II, DISTRICT : SOUTH 24 PARGANAS (SM/13574) |
6.8 |
0 |
52 |
Alipore Division |
HARIDAS DUTTA |
Sinking of 150 X 100 mm dia. X 360 Mtr. Depth Rig bored Tube wells, Ground Water Recharge Structure of Tubewell, Construction of Switch Room (3750 x 2550), Construction of soak pit, pavement, boundary fencing, MS gate, land development, approach road, La |
000008ORD/000787/2022-202 |
ORD/000787/2022-2023 |
6642/AD |
14/11/2022 |
1 |
11.55 |
AUGMENTATION OF GROUND WATER BASED MINI PIPED WATER SUPPLY SCHEME FOR MAUKHALI KUMARKHALI (PART-V) UNDER ALIPORE DIVISION, PHE DTE, BLOCK: CANNING-II, DISTRICT : SOUTH 24 PARGANAS (SM/13578) |
11.55 |
0 |
53 |
Alipore Division |
M/S PRADIP KUMAR PAL |
Laying distribution system, Functional Household Tap Connection (FHTC) to all households and Construction of 01 no. Pump House for Ganeshpur Left Out Water Supply Scheme, Block - Kakdwip for implementation of JJM under Kakdwip Sub-Division of Alipore Div |
000008ORD/000856/2022-202 |
ORD/000856/2022-2023 |
6939/AD |
18/11/2022 |
1 |
20.8 |
Augmentation of Ganeshpur (Left out Areas) PWSS for Providing Functional Household Tap Connection (FHTC) (SM/09922) |
20.8 |
0 |
54 |
Alipore Division |
JAL PRAVAHIKA PVT. LTD. |
Construction of 300 cum. Over Head Reservoir (OHR), (20 mtr. Staging Height) along with 2 nos. Pump House, Laying distribution system, Rising Main, Functional Household Tap Connection (FHTC) to all households including design & drawing of pile foundation |
000008ORD/000901/2022-202 |
ORD/000901/2022-2023 |
7275/AD |
24/11/2022 |
1 |
15.96 |
GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR BHAJNA UNDER ALIPORE DIVISION, BLOCK : PATHARPRATIMA, DISTRICT : SOUTH 24 PARGANAS (SM/12732) |
15.96 |
0 |
55 |
Alipore Division |
M/S R.K.ENTERPRISE |
Repairing of boundary wall at Koutala W/S Scheme, modified as Zone- III of Mathurapur-II Block in connection with Jal Jeevan Mission (JJM) for Mega Surface water based water supply scheme for Falta-Mathurapur, District South 24 parganas under Raidighi Sub |
000008ORD/000991/2023-202 |
ORD/000991/2023-2024 |
287/RSD |
29/09/2023 |
1 |
4.61 |
AUGMENTATION OF DISTRIBUTION SYSTEM UNDER ZONE-III, MATHURAPUR-II BLOCK FOR PROVIDING FHTC TO ALL THE HOUSEHOLDS IN CONNECTION WITH JAL JEEVAN MISSION UNDER MEGA SURFACE BASED WATER SUPPLY CSHEME FOR FALTA MATHURAPUR UNDER ALIPORE DIVISION PHE DTE. (SM/15504) |
4.61 |
0 |
56 |
Alipore Division |
M/S. BISWAS CONSTRUCTION (II) |
Repairing of pump house ? 1 & 3 and approach road and plinth protection at Uttar Kashinagar W/S Scheme, modified as Zone- I of Mathurapur-II Block in connection with Jal Jeevan Mission (JJM) for Mega Surface water based water supply scheme for Falta-Mathu |
000008ORD/000993/2023-202 |
ORD/000993/2023-2024 |
290/RSD |
29/09/2023 |
1 |
3.76 |
Retrofitting of Distribution System of Zone-I, Mathurapur-II Block for Providing Functional Household Tap Connection (FHTC) to all the households in connection with Jal Jeevan Mission (JJM) & Jal Swapna under Mega Surface Water Based Water Supply Scheme f (SM/09770) |
3.76 |
0 |
57 |
Alipore Division |
M/S. MIHIR KUMAR NASKAR |
Trial cum production PVC pipe fitted Tubewell 75mm x 40mm dia. upto 350 mtr depth at Iswaripur W/S Scheme of Canning-II Block under Canning Sub-Division of Alipore Division P.H.E. Dte. |
000008ORD/001006/2022-202 |
ORD/001006/2022-2023 |
857/CSD |
23/08/2022 |
1 |
2 |
Iswaripur Piped Water supply Scheme (SM/05579) |
2 |
0 |
58 |
Alipore Division |
PATHIK PABAN NANDI |
Construction of 200 M3 capacity 20 M. staging height R.C.C. Over Head Water Reservoir, Laying distribution system & Providing FHTC etc of Ground Water Based Augmentation Piped W/S Scheme for Satjelia (Zone-I) Block - Gosaba under Canning Sub-Division of |
000008ORD/001071/2023-202 |
ORD/001071/2023-2024 |
3508/AD |
16/10/2023 |
1 |
188.12 |
AUGMENTATION AND RETROFITTING OF SATJELIA (ZONE-I) PWSS FOR PROVIDING FHTC, BLOCK - GOSABA (SM/16002) |
188.12 |
0 |
59 |
Alipore Division |
DIPANKAR DUTTA |
Laying distribution system for providing Functional Household Tap Connection (FHTC) to all households for Augmentation of Budhakhali Zone-I (Part - I & II) Water Supply Scheme, Block - Namkhana for implementation of JJM under Kakdwip Sub-Division of Alip |
000008ORD/001100/2022-202 |
ORD/001100/2022-2023 |
8435/AD |
15/12/2022 |
1 |
14.51 |
AUGMENTATION OF GROUND WATER BASED BUDAKHALI ZONE- I (PART - I & II) , PIPE WATER SUPPLY SCHEME Phase-B, UNDER ALIPORE DIVISION, BLOCK : NAMKHANA, DISTRICT : SOUTH 24 PARGANAS (SM/14041) |
14.51 |
0 |
60 |
Alipore Division |
PRINCE INDUSTRIES (INDIA) |
Construction of 200 cum. Over Head Reservoir (OHR), (20 mtr. Staging Height) including design & drawing of pile foundation & pile cap after soil investigation along with Laying distribution system, Rising Main, Functional Household Tap Connection (FHTC) t |
000008ORD/001143/2023-202 |
ORD/001143/2023-2024 |
3671/AD |
01/11/2023 |
1 |
65.69 |
SHIBNAGAR ABAD PIPED WATER SUPPLY SCHEME IN NAMKHANA BLOCK IN SOUTH 24 PARGANAS, WEST BENGAL UNDER JAL JEEVAN MISSION UNDER KAKDWIP SUB-DIVISION OF ALIPORE DIVISION, PHE DTE. (SM/18129) |
65.69 |
0 |
61 |
Alipore Division |
ADITYA HAZRA |
Restoration and laying of parallel line by UPVC pipes in distribution system at Falta Zone-II for providing 100% FHTC within Mega Surface water based water supply scheme for Falta-Mathurapur, District South 24 Parganas under Diamond Harbour Sub-Division |
000008ORD/001151/2023-202 |
ORD/001151/2023-2024 |
3197/AD |
04/10/2023 |
1 |
51.25 |
AUGMENTATION OF LAYING DISTRIBUTION SYSTEM TO EXTENTED BENEFIT OF 100% HOUSEHOLD BY PROVIDING FUNCTIONAL FHTC FOR THE LEFT OUT AREAS IN ZONE- II AT FALTA BLOCK WITHIN 'MEGA SURFACE WATER BASED WATER SUPPLY SCHEME FOR FALTA- MATHURAPUR,DISTRICT SOUTH 24 PA (SM/13952) |
51.25 |
0 |
62 |
Alipore Division |
MEHAI TECHNOLOGY LIMITED |
Sinking of 250mm x 150mm dia. 360 mtr. deep Tubewell by Direct Rotary Rig Method using P.V.C pipe and pre-packed Resin Bonded Gravel Filter at Bharatgarh W/S Scheme, Block - Basanti under Canning Sub Division of Alipore Division, PHE Dte. |
000008ORD/001193/2023-202 |
ORD/001193/2023-2024 |
3998/AD |
21/11/2023 |
1 |
18.02 |
AUGMENTATION & RETROFITTING OF BHARATGARH PWSS FOR PROVIDING FHTC BLOCK-BASANTI (SM/15503) |
18.02 |
0 |
63 |
Alipore Division |
KIRAN ENTERPRISES |
Construction of boundary wall along with Land Development and Plinth Protection and Approach Road for Pump House at Head Work Site for Augmentation of Srinarayanpur (Part-I, II, III) W/S scheme, Block : Pathar Pratima under JJM of Kakdwip Sub-Division und |
000008ORD/001213/2023-202 |
ORD/001213/2023-2024 |
3870/AD |
09/11/2023 |
1 |
12.17 |
AUGMENTATION OF GROUND WATER BASED SRINARAYANPUR (PART I,II & III) , PIPE WATER SUPPLY SCHEME Phase-B, UNDER ALIPORE DIVISION, BLOCK : PATHARPRATIMA, DISTRICT : SOUTH 24 PARGANAS (SM/13570) |
12.17 |
0 |
64 |
Alipore Division |
MEHAI TECHNOLOGY LIMITED |
Sinking of 01 (one) No. 250mm x 150mm dia. 360 mtr. deep Replacement Tubewell (Pump House No. 2) by Direct Rotary Rig Method using P.V.C pipe and pre-packed Resin Bonded Gravel Filter for Augmentation of Raghudevpur W/S Scheme (Zone-XVII, Mathurapur-I Bl |
000008ORD/001256/2023-202 |
ORD/001256/2023-2024 |
4181/AD |
28/11/2023 |
1 |
19.29 |
AUGMENTATION OF DISTRIBUTION SYSTEM UNDER ZONE-XVII, MATHURAPUR-I BLOCK FOR PROVIDING FHTC TO ALL THE HOUSEHOLDS I/C/W JJM UNDER MEGA SURFACE WATER BASED W/S/S FOR FALTA-MATHURAPUR UNDER ALIPORE DIVISION, PHE DTE. (SM/15467) |
19.29 |
0 |
65 |
Alipore Division |
GHOSH CONSTRUCTION |
Land development of Pump House No. 3 at Singheswar W/S Scheme, Block-Canning-II under Canning Sub-Division of Alipore Division, P.H.E. Dte. |
000008ORD/001264/2023-202 |
ORD/001264/2023-2024 |
1067/CSD |
09/10/2023 |
1 |
0.89 |
Singheswar Piped Water Supply Scheme (SM/05714) |
0.89 |
0 |
66 |
Alipore Division |
MUNNA AGROTECH ENTERPRISE |
Sinking of 04 Nos. 250mm x 150mm dia. 360 mtr. deep Tubewell by D.R. Rig method using UPVC Pipe & Pre-packed Resin Bonded Gravel Filter for Augmentation of Paschim Surendranagar (Zone-I) (Part-I, II & III) W/S Scheme, Block - Pathar Pratima for implementa |
000008ORD/001275/2022-202 |
ORD/001275/2022-2023 |
9587/AD |
03/01/2023 |
1 |
18.38 |
AUGMENTATION OF GROUND WATER BASED PASCHIM SURENDRANAGAR (ZONE-I) (PART I, II & III) , PIPE WATER SUPPLY SCHEME Phase-B, UNDER ALIPORE DIVISION, BLOCK : PATHARPRATIMA, DISTRICT : SOUTH 24 PARGANAS (SM/14124) |
18.38 |
0 |
67 |
Alipore Division |
SARADA CONSTRUCTION |
Sinking of 02 Nos. 250mm x 150mm dia. 360 mtr. deep Tubewell by D.R. Rig method using UPVC Pipe & Pre-packed Resin Bonded Gravel Filter for Augmentation of Sibpur (Zone-I & II) W/S Scheme, Block - Sagar for implementation of JJM under Kakdwip Sub-Division |
000008ORD/001279/2022-202 |
ORD/001279/2022-2023 |
9591/AD |
03/01/2023 |
1 |
44.75 |
AUGMENTATION FOR GROUND WATER BASED SHIBPUR (ZONE - I & II), PIPE WATER SUPPLY SCHEME Phase-B, UNDER ALIPORE DIVISION, BLOCK : SAGAR, DISTRICT : SOUTH 24 PARGANAS (SM/13788) |
44.75 |
0 |
68 |
Alipore Division |
M/S. BOSE CONCERN |
Sinking of 02 Nos. 250mm x 150mm dia. 360 mtr. deep Tubewell by D.R. Rig method using UPVC Pipe & Pre-packed Resin Bonded Gravel Filter at 1st and 2nd Tubewell Site of Buraburir Tat W/S Scheme, Block - Pathar Pratima for implementation of JJM under Kakdwi |
000008ORD/001280/2022-202 |
ORD/001280/2022-2023 |
9592/AD |
03/01/2023 |
1 |
46.68 |
GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR BURABURIR TAT , UNDER ALIPORE DIVISION, BLOCK : PATHARPRATIMA, DISTRICT : SOUTH 24 PARGANAS (SM/13801) |
46.68 |
0 |
69 |
Alipore Division |
SNEHA CONSTRUCTION |
Sinking of 3 (three) Nos. 300mm x 200mm dia. 360 mtr. deep Tubewell by D.R. Rig method using PVC Pipe & Pre-packed Resin Bonded Gravel at 3 different Tubewell Sites for Augmentation of Canning Water Supply Scheme (Zone - II), Block - Canning - I under C |
000008ORD/001436/2021-202 |
ORD/001436/2021-2022 |
6245/AD |
23/02/2022 |
1 |
15.53 |
Augmentation of Canning Water Supply Scheme. (SM/13116) |
15.53 |
0 |
70 |
Alipore Division |
M/S B.M. CONSTRUCTION |
Retrofitting of distribution system for Providing Functional Household Tap Connection (FHTC) to all the households in Mathurapur-I, Zone-III (Krishnachandrapur PWSS) including Operation & Maintenance of scheme for 1 (one) year under Mega Surface Water Ba |
000008ORD/001453/2021-202 |
ORD/001453/2021-2022 |
6069/AD |
17/02/2022 |
1 |
33.82 |
AUGMENTATION OF DISTRIBUTION SYSTEM INCLUDING OHR UNDER ZONE-III, MATHURAPUR-I BLOCK FOR PROVIDING FUNCTIONAL HOUSEHOLD TAP CONNECTION (FHTC) IN CONNECTION WITH JAL JEEVAN MISSION (JJM) UNDER MEGA SURFACE WATER BASED WATER SUPPLY SCHEME FOR FALTA-MATHURAP (SM/15469) |
33.82 |
0 |
71 |
Alipore Division |
M/S KHAJABABA ENTERPRISE |
Laying distribution system for providing Functional Household Tap Connection (FHTC) to all households for Augmentation of Manasadwip (Zone-I & II) Water Supply Scheme, Block - Sagar for implementation of JJM under Kakdwip Sub-Division of Alipore Division, |
000008ORD/001461/2023-202 |
ORD/001461/2023-2024 |
4692/AD |
18/12/2023 |
1 |
29.59 |
AUGMENTATION OF GROUND WATER BASED MANASADWIP (ZONE-I & II), PIPE WATER SUPPLY SCHEME Phase-B, UNDER ALIPORE DIVISION, BLOCK : SAGAR, DISTRICT : SOUTH 24 PARGANAS (SM/14518) |
29.59 |
0 |
72 |
Alipore Division |
M/S R.K.ENTERPRISE (SALBAGAN) |
Construction of 150 cum. Over Head Reservoir (OHR), (20 mtr. Staging Height) along with Pump House, Laying distribution system, Rising Main, Functional Household Tap Connection (FHTC) to all households including design & drawing of foundation after soil i |
000008ORD/001479/2022-202 |
ORD/001479/2022-2023 |
10987/AD |
07/02/2023 |
1 |
84.33 |
GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR INDRANARAYANPUR, UNDER ALIPORE DIVISION, BLOCK : PATHARPRATIMA, DISTRICT : SOUTH 24 PARGANAS (SM/13827) |
84.33 |
0 |
73 |
Alipore Division |
MUNNA AGROTECH ENTERPRISE |
Construction of 250 cum. Over Head Reservoir (OHR), (20 mtr. Staging Height) along with Pump House, Laying distribution system, Rising Main, Functional Household Tap Connection (FHTC) to all households including design & drawing of foundation after soil i |
000008ORD/001495/2022-202 |
ORD/001495/2022-2023 |
10988/AD |
07/02/2023 |
1 |
54.3 |
GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR DIGAMBERPUR , UNDER ALIPORE DIVISION, BLOCK : PATHARPRATIMA, DISTRICT : SOUTH 24 PARGANAS (SM/13764) |
54.3 |
0 |
74 |
Alipore Division |
PARAMESWAR CHOWDHURY |
Construction of 200 cum. Over Head Reservoir (OHR), (20 mtr. Staging Height) along Laying distribution system, Rising Main, Functional Household Tap Connection (FHTC) to all households including design & drawing of foundation after soil investagation incl |
000008ORD/001502/2022-202 |
ORD/001502/2022-2023 |
10990/AD |
07/02/2023 |
1 |
15.16 |
GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR RAKHASKHALI , UNDER ALIPORE DIVISION, BLOCK : PATHARPRATIMA, DISTRICT : SOUTH 24 PARGANAS (SM/13802) |
15.16 |
0 |
75 |
Alipore Division |
DIPA CHHETRI |
Providing Functional Household Tap Connection (FHTC) to the households at Hero Bhanga of Dakshin Redokhali Water Supply Scheme, Block - Canning-I, South 24 Pgs. District under Canning Sub-Division of Alipore Division, P.H.E.Dte. (Phase ¿ XI) |
000008ORD/001525/2020-202 |
ORD/001525/2020-2021 |
1192/CSD |
15/12/2020 |
1 |
4.44 |
Retrofitting of distribution system for Providing Functional Household Tap Connection (FHTC) to all the households for 21 (twenty one) nos. habitation of all the households in connection with Jal Jeevan Mission (JJM) and Jal Swapna for Dakshin Rendokhali (SM/07629) |
4.44 |
0 |
76 |
Alipore Division |
DEEPAK ENTERPRISE |
Construction of 200 cum. Over Head Reservoir (OHR), (20 mtr. Staging Height) including design & drawing of pile foundation & pile cap after soil investigation along with Laying distribution system, Rising Main, Functional Household Tap Connection (FHTC) t |
000008ORD/001649/2022-202 |
ORD/001649/2022-2023 |
11316/AD |
10/02/2023 |
1 |
48.35 |
AUGMENTATION OF GROUND WATER BASED LAKSHMI JANARDANPUR PWSS TO ACCOMMODATE FHTC IN PATHARPRATIMA BLOCK UNDER KAKDWIP SUB-DIVISION OF ALIPORE DIVISION, PHE DTE IN SOUTH 24 PARGANAS DISTRICT (SM/10484) |
48.35 |
0 |
77 |
Alipore Division |
DIPAK ROY |
Laying distribution system, Functional Household Tap Connection (FHTC) to all households for Madhabnagar Zone -II Water Supply Scheme, Block - Pathar Pratima for implementation of JJM under Kakdwip Sub-Division of Alipore Division, P.H.E. Dte. (Part-C) [ |
000008ORD/001756/2022-202 |
ORD/001756/2022-2023 |
11756/AD |
21/02/2023 |
1 |
49.6 |
MADHABNAGAR ZONE-II PIPED WATER SUPPLY SCHEME IN PATHAR PRATIMA BLOCK IN SOUTH 24 PARGANAS, WEST BENGAL UNDER JAL JEEVAN MISSION UNDER KAKDWIP SUB-DIVISION OF ALIPORE DIVISION, PHE DTE. (SM/14462) |
49.6 |
0 |
78 |
Alipore Division |
MONDAL CONSTRUCTION NEW |
Construction of 200 cum. Over Head Reservoir (OHR), (20 mtr. Staging Height) along with Pump House, Laying distribution system, Rising Main, Functional Household Tap Connection (FHTC) to all households including design & drawing of foundation after soil i |
000008ORD/001757/2022-202 |
ORD/001757/2022-2023 |
11556/AD |
17/02/2023 |
1 |
31.9 |
GROUND WATER BASED WATER SUPPLY SCHEME FOR DAKSHIN MADHUSUDANPUR UNDER ALIPORE DIVISION, BLOCK-PATAHRPRATIMA,DISTRICT - SOUTH 24 PARGANAS (SM/13977) |
31.9 |
0 |
79 |
Alipore Division |
M/S MAITY CONSTRUCTION |
Sinking of 02 Nos. 250mm x 150mm dia. 360 mtr. deep Tubewell by D.R. Rig method using UPVC Pipe & Pre-packed Resin Bonded Gravel Filter for Augmentation of Budhakhali Zone-II (Part- II) W/S Scheme, Block - Namkhana for implementation of JJM under Kakdwip |
000008ORD/001772/2022-202 |
ORD/001772/2022-2023 |
12045/AD |
27/02/2023 |
1 |
18.27 |
AUGMENTATION OF GROUND WATER BASED BUDAKHALI ZONE- II (PART - I & II) , PIPE WATER SUPPLY SCHEME Phase-B, UNDER ALIPORE DIVISION, BLOCK : NAMKHANA, DISTRICT : SOUTH 24 PARGANAS (SM/14123) |
18.27 |
0 |
80 |
Alipore Division |
M/S MAITY CONSTRUCTION |
Sinking of 01 No. 250mm x 150mm dia. 360 mtr. deep Tubewell by D.R. Rig method using UPVC Pipe & Pre-packed Resin Bonded Gravel Filter for Augmentation of Rajnagar (Phase-B) W/S Scheme, Block - Namkhana for implementation of JJM under Kakdwip Sub-Divisio |
000008ORD/001776/2022-202 |
ORD/001776/2022-2023 |
12058/AD |
27/02/2023 |
1 |
19.15 |
AUGMENTATION OF GROUND WATER BASED RAJNAGAR, PIPE WATER SUPPLY SCHEME Phase-B, UNDER ALIPORE DIVISION, BLOCK : NAMKHANA, DISTRICT : SOUTH 24 PARGANAS (SM/13875) |
19.15 |
0 |
81 |
Alipore Division |
S. CHAKRABORTY AND CO. |
Sinking of 02 Nos. 250mm x 150mm dia. 360 mtr. deep Tubewell by D.R. Rig method using UPVC Pipe & Pre-packed Resin Bonded Gravel Filter at 1st and 2nd Tubewell Site of Madhabnagar (Zone-I) Water Supply Scheme, Block - Pathar Pratima for implementation o |
000008ORD/001780/2022-202 |
ORD/001780/2022-2023 |
11757/AD |
21/02/2023 |
1 |
16.47 |
MADHABNAGAR ZONE - I PIPED WATER SUPPLY SCHEME IN PATHAR PRATIMA BLOCK IN SOUTH 24 PARGANAS, WEST BENGAL UNDER JAL JEEVAN MISSION UNDER KAKDWIP SUB-DIVISION OF ALIPORE DIVISION, PHE DTE. (SM/15525) |
16.47 |
0 |
82 |
Alipore Division |
ALOK ENTERPRISE (A UNIT OF SAK |
Construction of 300cum capacity 20.00 mtr staging height R.C.C OHR as per departmental design, drawing and specification including R.C.C bored pile & pile cap upto pedestal at Radhakrishnapur W/S Scheme , block Sagar under Kakdwip Sub Division of Alipore |
000008ORD/001789/2018-201 |
ORD/001789/2018-2019 |
3418/AD |
05/12/2018 |
1 |
18.36 |
AUGMENTATION FOR GROUND WATER BASED RADHAKRISHNAPUR , PIPE WATER SUPPLY SCHEME Phase-B, UNDER ALIPORE DIVISION, BLOCK : SAGAR, DISTRICT : SOUTH 24 PARGANAS (SM/13972) |
18.36 |
0 |
83 |
Alipore Division |
HI TECH ENTERPRISE |
Construction of switch room cum chlorine room (4.88m x 3.66m) including Sanitary arrangement as per departmental drawing at the site of Augmentation of Dhuri W/S Scheme , Block - Basanti under Canning Sub-Division of Alipore Division, PHE Dte. [Pump Hous |
000008ORD/001819/2022-202 |
ORD/001819/2022-2023 |
12159/AD |
01/03/2023 |
1 |
6.85 |
AUGMENTATION OF GROUND WATER BASED DHURI, PIPED WATER SUPPLY SCHEME BLOCK - BASANTI UNDER CANNING SUB - DIVISION OF ALIPORE DIVISION, PHE DTE. (SM/15834) |
6.85 |
0 |
84 |
Alipore Division |
GOLDEN GROUPS |
Sinking of 02 Nos. 250mm x 150mm dia. 360 mtr. deep Tubewell by D.R. Rig method using UPVC Pipe & Pre-packed Resin Bonded Gravel Filter for Debnagar W/S Scheme, Block - Namkhana for implementation of JJM under Kakdwip Sub-Division of Alipore Division, P.H |
000008ORD/001833/2022-202 |
ORD/001833/2022-2023 |
12183/AD |
01/03/2023 |
1 |
36.24 |
GROUND WATER BASED DEBNAGAR PIPED WATER SUPPLY SCHEME UNDER ALIPORE DIVISION, PHE DTE, BLOCK-NAMKHANA, DISTRICT-SOUTH 24 PARAGANAS (SM/16027) |
36.24 |
0 |
85 |
Alipore Division |
M/S NAIYA & MAITY |
Sinking of 02 Nos. 250mm x 150mm dia. 360 mtr. deep Replacement Tubewell by D.R. Rig method using UPVC Pipe & Pre-packed Resin Bonded Gravel Filter at Head Work and 2nd Tubewell Site of Dwariknagar W/S Scheme, Block - Namkhana for implementation of JJM un |
000008ORD/001836/2023-202 |
ORD/001836/2023-2024 |
124/AD |
05/01/2024 |
1 |
18.86 |
AUGMENTATION OF GROUND WATER BASED DWARIKNAGAR, PIPE WATER SUPPLY SCHEME Phase-B, UNDER ALIPORE DIVISION, BLOCK : NAMKHANA, DISTRICT : SOUTH 24 PARGANAS. (SM/11847) |
18.86 |
0 |
86 |
Alipore Division |
M/S. TRIPATHI & CO. |
Laying distribution system for providing FHTC to all households for Augmentation of Khas Ramkarchar (Zone- I & II) Water Supply Scheme, Block - Sagar for implementation of JJM under Kakdwip Sub-Division of Alipore Division, P.H.E.D. (Zone-I) (Part-B) |
000008ORD/001839/2023-202 |
ORD/001839/2023-2024 |
127/AD |
05/01/2024 |
1 |
21.14 |
AUGMENTATION FOR GROUND WATER BASED KHAS RAMKARCHAR, PIPED WATER SUPPLY SCHEME Phase-B, UNDER ALIPORE DIVISION, BLOCK : SAGAR, DISTRICT : SOUTH 24 PARGANAS (SM/18871) |
21.14 |
0 |
87 |
Alipore Division |
SNEHA CONSTRUCTION |
Sinking of 02 (two) nos. 250mm x 150mm dia. 360 mtr. deep Tubewell by Direct Rotary Rig Method using P.V.C pipe and pre-packed Resin Bonded Gravel Filter at Augmentation of Basanti (Zone-II) W/S Scheme, Block - Basanti under Canning Sub Division of Alipor |
000008ORD/001868/2022-202 |
ORD/001868/2022-2023 |
12521/AD |
10/03/2023 |
1 |
39.8 |
AUGMENTATION & RETROFITTING OF BASANTI (ZONE-II) PWSS FOR PROVIDING FUNCTIONAL HOUSEHOLD TAP CONNECTION (FHTC) (SM/15959) |
39.8 |
0 |
88 |
Alipore Division |
DEBARATI ENTERPRISE |
Laying distribution DI pipeline and allied works to improve functionality Botiswar piped water supply Scheme at Zone- VI of Mathurapur -I Block in connection with Jal Jeevan Mission (JJM) for Mega Surface water based water supply scheme for Falta-Mathurap |
000008ORD/001908/2023-202 |
ORD/001908/2023-2024 |
436/RSD |
08/01/2024 |
1 |
2.96 |
AUGMENTATION OF DISTRIBUTION SYSTEM OF ZONE-VI, MATHURAPUR-I BLOCK FOR PROVIDING FUNCTIONAL HOUSEHOLD TAP CONNECTION (FHTC) IN CONNECTION WITH JAL JEEVAN MISSION (JJM) UNDER MEGA SURFACE WATER BASED WATER SUPPLY SCHEME FOR FALTA-MATHURAPUR UNDER ALIPORE D (SM/15465) |
2.96 |
0 |
89 |
Alipore Division |
DEBARATI ENTERPRISE |
Providing 100% Functional Household Tap Connection (FHTC) including Parallel pipeline and other allied works of piped water supply at Zone - VI of Mathurapur - I Block in connection with Jal Jeevan Mission (JJM) for Mega Surface Water Based water supply s |
000008ORD/001911/2023-202 |
ORD/001911/2023-2024 |
141/AD |
05/01/2024 |
1 |
11.25 |
AUGMENTATION OF DISTRIBUTION SYSTEM OF ZONE-VI, MATHURAPUR-I BLOCK FOR PROVIDING FUNCTIONAL HOUSEHOLD TAP CONNECTION (FHTC) IN CONNECTION WITH JAL JEEVAN MISSION (JJM) UNDER MEGA SURFACE WATER BASED WATER SUPPLY SCHEME FOR FALTA-MATHURAPUR UNDER ALIPORE D (SM/15465) |
11.25 |
0 |
90 |
Alipore Division |
M/S R.K.ENTERPRISE (SALBAGAN) |
Augmentation of laying distribution system including construction of 600 m3 capacity OHR to extend the benefit of 100% household by Providing Functional Household Tap Connection (FHTC) from distribution system in Zone-II at Kulpi block within " Mega Surf |
000008ORD/001922/2022-202 |
ORD/001922/2022-2023 |
12711/AD |
14/03/2023 |
1 |
55.56 |
AUGMENTATION OF LAYING DISTRIBUTION SYSTEM INCLUDING OHR WITH ALLIED WORKS TO EXTEND THE BENEFIT OF 100% HOUSEHOLDS BY PROVIDING FHTC UNDER ZONE-II OF KULPI BLOCK WITHIN 'MEGA SURFACE WATER BASED WATER SUPPLY SCHEME FOR FALTA-MATHURAPUR, DISTRICT-SOUTH 24 (SM/14471) |
55.56 |
0 |
91 |
Alipore Division |
SARADA CONSTRUCTION |
Sinking of 01 No. 250mm x 150mm dia. 450 mtr. deep Replacement Tubewell by D.R. Rig method using UPVC Pipe & Pre-packed Resin Bonded Gravel Filter at 2nd Tubewell Site of Satyadaspur W/S Scheme, Block - Pathar Pratima for implementation of JJM under Kakdw |
000008ORD/001979/2023-202 |
ORD/001979/2023-2024 |
438/AD |
24/01/2024 |
1 |
23.84 |
GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR SATYADASPUR , UNDER ALIPORE DIVISION, BLOCK : PATHARPRATIMA, DISTRICT : SOUTH 24 PARGANAS (SM/13965) |
23.84 |
0 |
92 |
Alipore Division |
MONDAL CONSTRUCTION (SANDESHKH |
Construction of switch room cum chlorine room (5.4m x 3.6m) including Sanitary arrangement as per departmental drawing at the site of Satjelia W/S Scheme (Zone-II), Block - Gosaba under Canning Sub-Division of Alipore Division, PHE Dte. [Pump House-I] |
000008ORD/002009/2022-202 |
ORD/002009/2022-2023 |
12915/AD |
21/03/2023 |
1 |
8.18 |
AUGMENTATION AND RETROFITTING OF SATJELIA (ZONE-II) PWSS FOR PROVIDING FHTC, BLOCK - GOSABA (SM/15973) |
8.18 |
0 |
93 |
Alipore Division |
SARADA CONSTRUCTION |
Laying distribution system, Functional Household Tap Connection (FHTC) to all households for Upendranagar Water Supply Scheme, Block - Pathar Pratima for implementation of JJM under Kakdwip Sub-Division of Alipore Division, P.H.E. Dte. (Part-C) [No. of F |
000008ORD/002063/2022-202 |
ORD/002063/2022-2023 |
13005/AD |
23/03/2023 |
1 |
39.8 |
GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR UPENDRANAGAR , UNDER ALIPORE DIVISION, BLOCK : PATHARPRATIMA, DISTRICT : SOUTH 24 PARGANAS (SM/13828) |
39.8 |
0 |
94 |
Alipore Division |
AQUATECH ENGINEERS |
Sinking of 02 Nos. 250mm x 150mm dia. 360 mtr. deep Tubewell by D.R. Rig method using UPVC Pipe & Pre-packed Resin Bonded Gravel Filter at 1st and 2nd Tubewell Site of Shibnagar Abad Water Supply Scheme, Block - Namkhana for implementation of JJM under |
000008ORD/002080/2022-202 |
ORD/002080/2022-2023 |
13255/AD |
31/03/2023 |
1 |
17.72 |
SHIBNAGAR ABAD PIPED WATER SUPPLY SCHEME IN NAMKHANA BLOCK IN SOUTH 24 PARGANAS, WEST BENGAL UNDER JAL JEEVAN MISSION UNDER KAKDWIP SUB-DIVISION OF ALIPORE DIVISION, PHE DTE. (SM/18129) |
17.72 |
0 |
95 |
Alipore Division |
M/S P. B. CONSTRUCTION |
Continuation work order for the work of Hiring of an Inspection Vehicle (Diesel Operated with Luxury Permit) for use of the Executive Engineer, Alipore Division, PHE Dte. for the period from 01.01.2024 to 30.06.2024. (Jan'24) |
000008ORD/002122/2023-202 |
ORD/002122/2023-2024 |
5112/AD |
29/12/2023 |
1 |
0.8 |
Retrofitting of Distribution System for Providing Functional Household Tap Connection (FHTC) to the households for 13 (thirteen) nos. habitation of all the households in connection with Jal Jeevan Mission (JJM) and Jal Swapna for Dakshin Gangadharpur W/S (SM/07761) |
0.8 |
0 |
96 |
Alipore Division |
MEGA SOLAR ENERGY |
Sinking of 01 No. 250mm x 150mm dia. 360 mtr. deep Replacement Tubewell by D.R. Rig method using UPVC Pipe & Pre-packed Resin Bonded Gravel Filter at 2nd Tubewell Site of Haripur (Zone - I and II) W/S Scheme, Block - Kakdwip for implementation of JJM unde |
000008ORD/002133/2023-202 |
ORD/002133/2023-2024 |
821/AD |
05/02/2024 |
1 |
18.97 |
AUGMENTATION FOR GROUND WATER BASED HARIPUR (ZONE- I & II), PIPED WATER SUPPLY SCHEME, Phase-B, UNDER ALIPORE DIVISION, BLOCK : NAMKHANA, DISTRICT : SOUTH 24 PARGANAS (SM/18698) |
18.97 |
0 |
97 |
Alipore Division |
CONSTEEL CONSULTANCY & SERVICE |
Preparation of design (Pile and Pile Cap) drawing for foundation of 250 cum. capacity OHR of Nadabhanga PWSS under JJM at Namkhana Block under Kakdwip Sub-Division of Alipore Division P.H.E. Dte. |
000008ORD/002215/2023-202 |
ORD/002215/2023-2024 |
872/KSD |
14/12/2023 |
1 |
0.48 |
GROUND WATER BASED NADABANGHA PIPE WATER SUPPLY SCHEME UNDER ALIPORE DIVISION, BLOCK-NAMKHANA,DISTRICT - SOUTH 24 PARGANAS (SM/14158) |
0.48 |
0 |
98 |
Alipore Division |
CONSTEEL CONSULTANCY & SERVICE |
Preparation of design (Pile and Pile Cap) drawing for foundation of 350 cum. capacity OHR of Madhusudanpur PWSS under JJM at Kakdwip Block under Kakdwip Sub-Division of Alipore Division P.H.E. Dte. |
000008ORD/002216/2023-202 |
ORD/002216/2023-2024 |
873/KSD |
14/12/2023 |
1 |
0.48 |
GROUND WATER BASED MADHUSUDANPUR PIPE WATER SUPPLY SCHEME UNDER ALIPORE DIVISION, BLOCK : KAKDWIP, DISTRICT : SOUTH 24 PARGANAS (SM/18126) |
0.48 |
0 |
99 |
Alipore Division |
CONSTEEL CONSULTANCY & SERVICE |
Preparation of design (Pile and Pile Cap) drawing for foundation of 400 cum. capacity OHR of Dakshin Durgapur PWSS under JJM at Namkhana Block under Kakdwip Sub-Division of Alipore Division P.H.E. Dte. |
000008ORD/002217/2023-202 |
ORD/002217/2023-2024 |
874/KSD |
14/12/2023 |
1 |
0.48 |
DAKSHIN DURGAPUR & ADJOINING MOUZAS PIPED WATER SUPPLY SCHEME IN NAMKHANA BLOCK IN SOUTH 24 PARGANAS, WEST BENGAL UNDER JAL JEEVAN MISSION UNDER KAKDWIP SUB-DIVISION OF ALIPORE DIVISION PHE DTE. (SM/18684) |
0.48 |
0 |
100 |
Alipore Division |
CONSTEEL CONSULTANCY & SERVICE |
Preparation of design (Pile and Pile Cap) drawing for foundation of 250 cum. capacity OHR of Debnagar PWSS under JJM at Namkhana Block under Kakdwip Sub-Division of Alipore Division P.H.E. Dte. |
000008ORD/002218/2023-202 |
ORD/002218/2023-2024 |
875/KSD |
14/12/2023 |
1 |
0.48 |
GROUND WATER BASED DEBNAGAR PIPED WATER SUPPLY SCHEME UNDER ALIPORE DIVISION, PHE DTE, BLOCK-NAMKHANA, DISTRICT-SOUTH 24 PARAGANAS (SM/16027) |
0.48 |
0 |
101 |
Alipore Division |
CONSTEEL CONSULTANCY & SERVICE |
Preparation of design (Pile and Pile Cap) drawing for foundation of 600 cum. capacity OHR of Kakdwip PWSS under JJM at Kakdwip Block under Kakdwip Sub-Division of Alipore Division P.H.E. Dte. |
000008ORD/002233/2023-202 |
ORD/002233/2023-2024 |
719/KSD |
01/12/2023 |
1 |
0.48 |
GROUND WATER BASED KAKDWIP PIPE WATER SUPPLY SCHEME, BLOCK KAKDWIP UNDER ALIPORE DIVISION, DISTRICT SOUTH 24 PARGANAS. (SM/18682) |
0.48 |
0 |
102 |
Alipore Division |
DEBARATI ENTERPRISE |
Providing left-out Functional Household Tap Connection (FHTC) at Zone - VI (Mouza: Borasi, Raghabpur, Sadial, Sovanagar) of Mathurapur - I Block in connection with Jal Jeevan Mission (JJM) for Mega Surface water based water supply scheme for Falta-Mathura |
000008ORD/002269/2023-202 |
ORD/002269/2023-2024 |
476/RSD |
15/02/2024 |
1 |
2.84 |
AUGMENTATION OF DISTRIBUTION SYSTEM OF ZONE-VI, MATHURAPUR-I BLOCK FOR PROVIDING FUNCTIONAL HOUSEHOLD TAP CONNECTION (FHTC) IN CONNECTION WITH JAL JEEVAN MISSION (JJM) UNDER MEGA SURFACE WATER BASED WATER SUPPLY SCHEME FOR FALTA-MATHURAPUR UNDER ALIPORE D (SM/15465) |
2.84 |
0 |
103 |
Alipore Division |
DEBARATI ENTERPRISE |
Providing left-out Functional Household Tap Connection (FHTC) at Zone - VI (Mouza : Sarberia, Uttar Joykrishnapur, Narayanpur, Batiswar) of Mathurapur - I Block in connection with Jal Jeevan Mission (JJM) for Mega Surface water based water supply scheme f |
000008ORD/002270/2023-202 |
ORD/002270/2023-2024 |
477/RSD |
15/02/2024 |
1 |
1.33 |
AUGMENTATION OF DISTRIBUTION SYSTEM OF ZONE-VI, MATHURAPUR-I BLOCK FOR PROVIDING FUNCTIONAL HOUSEHOLD TAP CONNECTION (FHTC) IN CONNECTION WITH JAL JEEVAN MISSION (JJM) UNDER MEGA SURFACE WATER BASED WATER SUPPLY SCHEME FOR FALTA-MATHURAPUR UNDER ALIPORE D (SM/15465) |
1.33 |
0 |
104 |
Alipore Division |
M/S. JAYDEEP DASGUPTA |
Continuation work order for Laying distribution system, Rising Main, Functional Household Tap Connection (FHTC) to all households including O & M of Laying distribution, Rising Main & FHTC for 1 year after completion of FHTC works and Construction Pump H |
000008ORD/002299/2023-202 |
ORD/002299/2023-2024 |
898/AD |
07/02/2024 |
1 |
39.83 |
AUGMENTATION OF GROUND WATER BASED MRITYUNJAYNAGAR , PIPE WATER SUPPLY SCHEME Phase-B, UNDER ALIPORE DIVISION, BLOCK : SAGAR, DISTRICT : SOUTH 24 PARGANAS (SM/11698) |
39.83 |
0 |
105 |
Alipore Division |
BHATTACHARJEE & CO. |
Sinking of 250mm x 150mm dia. 360 mtr. deep Tubewell by Direct Rotary Rig Method using P.V.C pipe and pre-packed Resin Bonded Gravel Filter at Budhkhali W/S Scheme, Block - Canning-I under Canning Sub Division of Alipore Division, PHE Dte. (TW No. 2 alter |
000008ORD/002377/2023-202 |
ORD/002377/2023-2024 |
1201/AD |
29/02/2024 |
1 |
16.96 |
AUGMENTATION AND RETROFITTING OF BUDH KHALI PIPED WATER SUPPLY SCHEME FOR PROVIDING FUNCTIONAL HOUSEHOLD TAP CONNECTION (FHTC) (SM/15107) |
16.96 |
0 |