F4- Undisbursed Fund

Rs. in Lakh
SL No Division Unique Bill No System Bill No Bill Date Agency Work Name Unique Order No System Order No Order Memo No Order Date Bill Amount Scheme Requisition Amount Requisition Memo No Requisition Memo Date System Allotment No Allotment Date Allotment Number Allotment Amount
30 902.41 # 902.41 # 902.41
1 Alipurduar Division 000448BILL/00011/2022-202 BILL/00011/2022-2023 05/12/2022 DILIP MAHATO Construction of 400cum OHR for Augmentation of Uttar Kamakhyaguri Water Supply Scheme under Alipurduar Division, PHE Dte. 000448ORD/000412/2021-202 ORD/000412/2021-2022 2580/ALD 17/02/2022 40.78 REJUVENATION OF UTTAR KAMAKHYAGURI PIPED WATER SUPPLY SCHEME (SM/10170) 40.78 2417/ALD 06/12/2022 FAD/001766/2022 09/12/2022 2242/DPHE-12/14 40.78
2 Alipurduar Division 000448BILL/00040/2022-202 BILL/00040/2022-2023 09/12/2022 TAPASH KUMAR BHOWMICK Laying distribution system with new HDPE pipeline (Part- B) and providing FHTC and others allied works for SHRINATHPUR TG AREA PWSS under Alipurduar Division, PHE Dte. 000448ORD/000286/2022-202 ORD/000286/2022-2023 1640/ALD 19/09/2022 45.4 SHRINATHPUR TEA GARDEN AREA PIPED WATER SUPPLY SCHEME (SM/11709) 45.4 2555/ALD 16/12/2022 FAD/001897/2022 20/12/2022 2391/DPHE-12/14 45.4
3 Alipurduar Division 000448BILL/00047/2022-202 BILL/00047/2022-2023 15/12/2022 DAS CONSTRUCTION Construction of Pump House Boundary Wall Land development & pathway TW Boring (2nd Suite of OHR-1 ODEX 165) Raising Main for Jainti TG PWSS at Kumargram under Alipurduar Division. 000448ORD/000335/2019-202 ORD/000335/2019-2020 2020/ALD 20/03/2020 4.53 REJUVENATION OF JAYANTI WATER SUPPLY SCHEME' (SM/09898) 4.53 2555/ALD 16/12/2022 FAD/001897/2022 20/12/2022 2391/DPHE-12/14 4.53
4 Alipurduar Division 000448BILL/00085/2022-202 BILL/00085/2022-2023 02/01/2023 SUBHAS CHANDRA ROY Construction of Pump House ,Boundary Wall and Tube well Boring by ODEX-165 Method of drilling including Rising Main for JAGIJHORA BARABAK PWSS under Alipurduar Division PHE DTE 000448ORD/000425/2021-202 ORD/000425/2021-2022 2609/ALD 17/02/2022 6.02 AUGMENTATION OF JAGIJHORA BARABAK PIPED WATER SUPPLY SCHEME (SM/10169) 6.02 224/ALD 16/01/2024 FAD/003345/2023 17/01/2024 FAD/003345/2023 6.02
5 Alipurduar Division 000448BILL/00098/2022-202 BILL/00098/2022-2023 06/01/2023 GHOSH & SAHA CONSTRUCTION Laying balance portion pipeline and providing house connection at Jayanti Water Supply Scheme and Bhutiya Busty Area under Alipurduar Division, PHE Dte. 000448ORD/000202/2021-202 ORD/000202/2021-2022 975/ALD 13/09/2021 5.03 REJUVENATION OF JAYANTI WATER SUPPLY SCHEME' (SM/09898) 5.03 2781/ALD 09/01/2023 FAD/002140/2022 12/01/2023 2673/DPHE-12/14 5.03
6 Alipurduar Division 000448BILL/00110/2024-202 BILL/00110/2024-2025 27/06/2024 MAHENDRA CHHETRI Constructions of 250 Cum OHR as per Departmental Design & drawing including laying distribution system with new HDPE pipeline, RISING MAIN, Construction of 2(TWO) NOS of BOUNDARY WALL, 3(THREE) NOS ODEX-165 TUBE WELL, 3(THREE) NOS PUMP HOUSE, Soil Invest 000448ORD/000177/2023-202 ORD/000177/2023-2024 1113/ALD 28/07/2023 139.12 UTTAR MANDABARI PIPED WATER SUPPLY SCHEME (SM/16539) 139.12 1926/ALD 27/06/2024 FAD/000890/2024 28/06/2024 FAD/000890/2024 139.12
7 Alipurduar Division 000448BILL/00111/2024-202 BILL/00111/2024-2025 28/06/2024 HITANGSHU CHOUDHURY Construction of 2nos Tw boring by ODEX-165 method of drilling including distribution system with new UPVC pipeline, 2 nos Pump house, Boundary wall, pathway, providing FHTC and other allied works for 28 and 29 mile busty PWSS under Alipurduar Division, PH 000448ORD/000558/2022-202 ORD/000558/2022-2023 3502/ALD 23/03/2023 5.16 28&29 MILE BASTI PIPE WATER SUPPLY SCHEME (SM/16506) 5.16 1933/ALD 28/06/2024 FAD/000990/2024 08/07/2024 FAD/000990/2024 5.16
8 Alipurduar Division 000448BILL/00112/2024-202 BILL/00112/2024-2025 28/06/2024 MAHENDRA CHHETRI Construction of 200 cum OHR as per Departmental Design and drawing at KAIJALI BUSTY PWSS under Alipurduar Division, PHE Dte. 000448ORD/000353/2022-202 ORD/000353/2022-2023 2497/ALD 13/12/2022 20.6 AUGMENTATION OF KAIJALI BASTY WATER SUPPLY SCHEME (SM/11958) 20.6 1933/ALD 28/06/2024 FAD/000990/2024 08/07/2024 FAD/000990/2024 20.6
9 Alipurduar Division 000448BILL/00113/2024-202 BILL/00113/2024-2025 28/06/2024 TAPASH DAS Gap filling and replacing lower dia pipe and FHTC connection at Pararpar PWSS under Alipurduar Division, PHE Dte. 000448ORD/000562/2022-202 ORD/000562/2022-2023 3505/ALD 23/03/2023 0.28 PARARPAR PIPED WATER SUPPLY SCHEME (SM/14209) 0.28 1933/ALD 28/06/2024 FAD/000990/2024 08/07/2024 FAD/000990/2024 0.28
10 Alipurduar Division 000448BILL/00115/2024-202 BILL/00115/2024-2025 28/06/2024 TAPASH KUMAR BHOWMICK Continuation order of "Collection of house hold details at prescribed format through mobile app/Hard Copy including Geo-reference as directed by the E.I.C. and submission the same (in soft copy) to PHE Dte. PART-B" 000448ORD/000547/2023-202 ORD/000547/2023-2024 313/ALD 25/01/2024 4.67 UTTAR MAJID KHANA PIPED WATER SUPPLY SCHEME (SM/16538) 4.67 1933/ALD 28/06/2024 FAD/000990/2024 08/07/2024 FAD/000990/2024 4.67
11 Alipurduar Division 000448BILL/00116/2024-202 BILL/00116/2024-2025 28/06/2024 TAPASH KUMAR BHOWMICK Continuation order of "Entry of data for house Connection (JJM) of PWSS in website under Alipurduar division, PHE Dte." 000448ORD/000548/2023-202 ORD/000548/2023-2024 314/ALD 25/01/2024 4.29 UTTAR MAJID KHANA PIPED WATER SUPPLY SCHEME (SM/16538) 4.29 1933/ALD 28/06/2024 FAD/000990/2024 08/07/2024 FAD/000990/2024 4.29
12 Alipurduar Division 000448BILL/00117/2024-202 BILL/00117/2024-2025 28/06/2024 HARIDAS GHOSH Laying of rising main/distribution pipeline, supply of DI pipe and specials, horizontal boring by HDD method, bridge and culvert crossing, along with the other allied works at Dakshin Majidkhana PWSS under under Alipurduar Division, PHE Dte. 000448ORD/000395/2023-202 ORD/000395/2023-2024 206/ALD 16/01/2024 20.99 DAKSHIN MAJIDKHANA PIPED WATER SUPPLY SCHEME. (SM/13305) 20.99 1933/ALD 28/06/2024 FAD/000990/2024 08/07/2024 FAD/000990/2024 20.99
13 Alipurduar Division 000448BILL/00118/2024-202 BILL/00118/2024-2025 01/07/2024 MESSRS A.B.G CONSTRUCTION Boring of TW, Cons. Of Pump House, boundary wall, OHR (400 cum) inclu. Soil investigation works, Laying of rising main, distribution system and providing FHTC for BARIGURI PWSS under Alipurduar Division PHE DTE. (2nd call) 000448ORD/000029/2023-202 ORD/000029/2023-2024 333/ALD 16/05/2023 232.93 BARIGURI PIPED WATER SUPPLY SCHEME (SM/13246) 232.93 1944/ALD 01/07/2024 FAD/000990/2024 08/07/2024 FAD/000990/2024 232.93
14 Alipurduar Division 000448BILL/00119/2024-202 BILL/00119/2024-2025 01/07/2024 RATAN DUTTA Construction of Pump House, Boundary Wall, Tube well Boring by Reverse Rotary Method of drilling including Rising Main at Bhatibari Zone-II PWSS Under Alipurduar Division PHE DTE 000448ORD/000367/2022-202 ORD/000367/2022-2023 2611/ALD/ 21/12/2022 9.5 AUGMENTATION OF BHATIBARI PIPED WATER SUPPLY SCHEME (SM/14096) 9.5 1944/ALD 01/07/2024 FAD/000990/2024 08/07/2024 FAD/000990/2024 9.5
15 Alipurduar Division 000448BILL/00120/2024-202 BILL/00120/2024-2025 01/07/2024 DOOARS CONSTRUCTION COMPANY Construction of 2 nos. Tube well boring by ODEX-165 Method of drilling at HW site including distribution system with new HDPE pipeline, Construction of 200 cum OHR as per Departmental Design & drawing, Pump House , Boundary Wall, Path way including soil 000448ORD/000548/2022-202 ORD/000548/2022-2023 3571/ALD 27/03/2023 119.27 NIMTI DOMOHANI PIPED WATER SUPPLY SCHEME (SM/13244) 119.27 1944/ALD 01/07/2024 FAD/000990/2024 08/07/2024 FAD/000990/2024 119.27
16 Alipurduar Division 000448BILL/00121/2024-202 BILL/00121/2024-2025 01/07/2024 JAYDAB ADHIKARI Sample collection from different facilator less gram panchayat for 12 months under Alipurduar Division, PHE Dte. 000448ORD/000344/2023-202 ORD/000344/2023-2024 2545/ALD 28/11/2023 1.68 DRINKINH WATER SAMPLE COLLECTION & TESTING THROUGH FIELD TEST KIT (FTKs) & UPLOADING CHARGES FOR THE SAME RELATED TO WATER QUALITY MONITORING & SURVEILLANCE PROGRAMME UNDER JAL JEEVAN MISSION (SM/11752) 1.68 1944/ALD 01/07/2024 FAD/000941/2024 08/07/2024 FAD/000941/2024 1.68
17 Alipurduar Division 000448BILL/00122/2024-202 BILL/00122/2024-2025 01/07/2024 SSPR VALVE MANUFACTURING PVT L Supply of CI Sluice Valve and Special & CI Jeffy Coupling for Benkandi Water Supply Scheme under Alipurduar Division P.H.E. Dte. 000448ORD/000541/2023-202 ORD/000541/2023-2024 754/ALD 12/03/2024 12.88 BENGKANDI PIPED WATER SUPPLY SCHEME (SM/16820) 12.88 1944/ALD 01/07/2024 FAD/000990/2024 08/07/2024 FAD/000990/2024 12.88
18 Alipurduar Division 000448BILL/00123/2024-202 BILL/00123/2024-2025 01/07/2024 SSPR VALVE MANUFACTURING PVT L Supply of CIDF/CIPE pipes and specials & Sluice Valve for Paschim Satali Water Supply Scheme under Alipurduar Division P.H.E. Dte. 000448ORD/000479/2023-202 ORD/000479/2023-2024 697/ALD 07/03/2024 0.57 PASCHIM SATALI PIPED WATER SUPPLY SCHEME (SM/13245) 0.57 1944/ALD 01/07/2024 FAD/000990/2024 08/07/2024 FAD/000990/2024 0.57
19 Alipurduar Division 000448BILL/00124/2024-202 BILL/00124/2024-2025 01/07/2024 SSPR VALVE MANUFACTURING PVT L Supply of DIDF pipes and specials and Sluice Valve for Rangamati TG Water Supply Scheme (SM/14213) of Kalchini Block under Alipurduar Division P.H.E. Dte. 000448ORD/000520/2023-202 ORD/000520/2023-2024 839/ALD 14/03/2024 7.38 RANGAMATI TEA GARDEN PIPED WATER SUPPLY SCHEME (SM/14213) 7.38 1944/ALD 01/07/2024 FAD/000990/2024 08/07/2024 FAD/000990/2024 7.38
20 Alipurduar Division 000448BILL/00131/2024-202 BILL/00131/2024-2025 04/07/2024 MAHENDRA CHHETRI Construction of 150cum. OHR for PURBA KATHALBARI ZONE-IV Water Supply Scheme under Alipurduar Division, PHE Dte. 000448ORD/000149/2022-202 ORD/000149/2022-2023 984/ALD 15/07/2022 18.72 AUGMENTATION OF PURBA KATHALBARI WATER SUPPLY SCHEME (SM/11459) 18.72 2053/ALD 11/07/2024 FAD/001104/2024 15/07/2024 FAD/001104/2024 18.72
21 Alipurduar Division 000448BILL/00132/2024-202 BILL/00132/2024-2025 04/07/2024 MITHUN DAS Cons. of 100 cum OHR,BOUNDARY WALL, PUMP HOUSE, TUBE, RISING MAIN FOR Mouza-MUJNAI TEA GARDEN(JL NO.39,RL Plot No.121,129 &155) 410 unit CHA SUNDARI WATER SUPPLY SCHEME UNDER ALIPURDUAR DIVISION, PHE DTE. of North Bengal Circle-I, PHE Dte. 000448ORD/000455/2023-202 ORD/000455/2023-2024 436/ALD 07/02/2024 41.24 Supply of potable drinking water to Mujnai Tea Garden in relation with Chaa Sundari Project. (SM/08580) 41.24 1996/ALD 05/07/2024 FAD/001048/2024 09/07/2024 FAD/001048/2024 41.24
22 Alipurduar Division 000448BILL/00133/2024-202 BILL/00133/2024-2025 04/07/2024 SREE MAA CONSTRUCTION Providing FHTC from existing distribution system as per specification for DALIMPUR PWSS under Alipurduar Division, PHE Dte. 000448ORD/000287/2023-202 ORD/000287/2023-2024 1995/ALD 15/09/2023 9.96 AUGMENTATION OF DALIMPUR PWSS (SM/18254) 9.96 1996/ALD 05/07/2024 FAD/001048/2024 09/07/2024 FAD/001048/2024 9.96
23 Alipurduar Division 000448BILL/00135/2024-202 BILL/00135/2024-2025 04/07/2024 PRITAM DAS Providing FHTC from existing distribution system as per specification for Rajabhat TG PWSS under Alipurduar Division, PHE Dte. 000448ORD/000266/2023-202 ORD/000266/2023-2024 1884/ALD 07/09/2023 7.82 RAJABHAT TEA GARDEN PIPED WATER SUPPLY SCHEME. (SM/14093) 7.82 1996/ALD 05/07/2024 FAD/001048/2024 09/07/2024 FAD/001048/2024 7.82
24 Alipurduar Division 000448BILL/00136/2024-202 BILL/00136/2024-2025 05/07/2024 UJJWAL ROY Construction of 150cum. OHR for DALIMPUR ZONE-III Water Supply Scheme under Alipurduar Division, PHE Dte. 000448ORD/000169/2023-202 ORD/000169/2023-2024 972/ALD 12/07/2023 9.52 AUGMENTATION OF DALIMPUR PWSS (SM/18254) 9.52 1996/ALD 05/07/2024 FAD/001048/2024 09/07/2024 FAD/001048/2024 9.52
25 Alipurduar Division 000448BILL/00147/2022-202 BILL/00147/2022-2023 13/02/2023 DILIP MAHATO CONS. OF RESERVOIR (100M3), BOUNDARY WALL (80m), PUMP HOUSE (1No.), TUBE WELL (2 Nos.), RISING MAIN AND LAND DEVELOPMENT FOR TORSHA (Hat Khola Line, Naya Line, 3 No. Line (A) AND (B) and Khoyar line) 256 unit CHA SUNDARAI WATER SUPPLY SCHEME UNDER ALIPURD 000448ORD/000028/2022-202 ORD/000028/2022-2023 282/ALD 26/04/2022 30.44 Torsha Tea Garden Area Piped Water Supply Scheme in relation with Chaa Sundari Project. (SM/10039) 30.44 3090/ALD 13/02/2023 FAD/002441/2022 17/02/2023 3044/DPHE-12/14 30.44
26 Alipurduar Division 000448BILL/00151/2024-202 BILL/00151/2024-2025 11/07/2024 MADHAB SAHA Constructions of pump house & Tube well Boring by ODEX-165 Method of drilling at HW site & 2nd site , laying of distribution system with UPVC pipeline including rising main & delivery connection, Constructions of 250 Cum OHR as per Departmental Desig 000448ORD/000550/2022-202 ORD/000550/2022-2023 3573ALD 27/03/2023 33.23 PURBBA NARATHALI PIPED WATER SUPPLY SCHEME. (SM/16537) 33.23 2053/ALD 11/07/2024 FAD/001104/2024 15/07/2024 FAD/001104/2024 33.23
27 Alipurduar Division 000448BILL/00152/2024-202 BILL/00152/2024-2025 11/07/2024 SOUVIK ROY PALADHI Tube well Boring by ODEX-165 Method of drilling at HW, FIRST TUBE WELL site including laying distribution system with new UPVC pipeline , Constructions of 250 Cum OHR as per Departmental Design & drawing including soil investigation works , 2nos pump hou 000448ORD/000460/2022-202 ORD/000460/2022-2023 2981/ALD 02/02/2023 60.23 ATIABARI TEA GARDEN PIPED WATER SUPPLY SCHEME. (SM/14092) 60.23 2053/ALD 11/07/2024 FAD/001104/2024 15/07/2024 FAD/001104/2024 60.23
28 Alipurduar Division 000448BILL/00600/2023-202 BILL/00600/2023-2024 29/02/2024 HARIDAS GHOSH Supply of CIPE Special & CI Jeffy Coupling for Dakshin Paitkapara Water Supply Scheme under Alipurduar Division P.H.E. Dte. (699/ALD DT:08/06/2022) Construction of Pump House, Boundary Wall, Tube well Boring by Reverse Rotary Method of drilling at H/W si 000448 610/ALD 29/02/2024 6.95 DAKSHIN PAITKAPARA PIPED WATER SUPPLY SCHEME (SM/10174) 6.95 614/ALD 29/02/2024 FAD/004010/2023 01/03/2024 FAD/004010/2023 6.95
29 Alipurduar Division 000448BILL/00601/2023-202 BILL/00601/2023-2024 29/02/2024 HARIDAS GHOSH Construction of Pump House ,Boundary Wall and Providing FHTC including Laying of UPVC pipeline and Tube well Boring by ODEX-165 Method of drilling for Bholardabri PWSS under Alipurduar Division PHE DTE.(2382/ALD DT:31/01/2022) Construction of 450cum OHR 000448 611/ALD 29/02/2024 2.68 AUGMENTATION OF BHOLARDABRI PIPE WATER SUPPLY SCHEME (SM/09883) 2.68 614/ALD 29/02/2024 FAD/004010/2023 01/03/2024 FAD/004010/2023 2.68
30 Alipurduar Division 000448BILL/00682/2023-202 BILL/00682/2023-2024 23/03/2024 APSARI BHOWMICK Extension work order for Hiring of Diesel vehicle Maxi Cab(At least 7 seater) for Executive Engineer, Alipurduar Division under Alipurduar Division, PHE Dte.( 01.04.2021 to 30.06.2021) 000448ORD/000609/2020-202 ORD/000609/2020-2021 3051/ALD 31/03/2021 0.54 REJUVENATION OF BIRPARA(APD) WATER SUPPLY SCHEME (SM/09897) 0.54 1020/ALD 23/03/2024 FAD/004430/2023 27/03/2024 FAD/004430/2023 0.54
Total 902.41 # 902.41 # 902.41