1 |
Alipurduar Division |
000448BILL/00011/2022-202 |
BILL/00011/2022-2023 |
05/12/2022 |
DILIP MAHATO |
Construction of 400cum OHR for Augmentation of Uttar Kamakhyaguri Water Supply Scheme under Alipurduar Division, PHE Dte. |
000448ORD/000412/2021-202 |
ORD/000412/2021-2022 |
2580/ALD |
17/02/2022 |
40.78 |
REJUVENATION OF UTTAR KAMAKHYAGURI PIPED WATER SUPPLY SCHEME (SM/10170) |
40.78 |
2417/ALD |
06/12/2022 |
FAD/001766/2022 |
09/12/2022 |
2242/DPHE-12/14 |
40.78 |
2 |
Alipurduar Division |
000448BILL/00047/2022-202 |
BILL/00047/2022-2023 |
15/12/2022 |
DAS CONSTRUCTION |
Construction of Pump House Boundary Wall Land development & pathway TW Boring (2nd Suite of OHR-1 ODEX 165) Raising Main for Jainti TG PWSS at Kumargram under Alipurduar Division. |
000448ORD/000335/2019-202 |
ORD/000335/2019-2020 |
2020/ALD |
20/03/2020 |
4.53 |
REJUVENATION OF JAYANTI WATER SUPPLY SCHEME' (SM/09898) |
4.53 |
2555/ALD |
16/12/2022 |
FAD/001897/2022 |
20/12/2022 |
2391/DPHE-12/14 |
4.53 |
3 |
Alipurduar Division |
000448BILL/00098/2022-202 |
BILL/00098/2022-2023 |
06/01/2023 |
GHOSH & SAHA CONSTRUCTION |
Laying balance portion pipeline and providing house connection at Jayanti Water Supply Scheme and Bhutiya Busty Area under Alipurduar Division, PHE Dte. |
000448ORD/000202/2021-202 |
ORD/000202/2021-2022 |
975/ALD |
13/09/2021 |
5.03 |
REJUVENATION OF JAYANTI WATER SUPPLY SCHEME' (SM/09898) |
5.03 |
2781/ALD |
09/01/2023 |
FAD/002140/2022 |
12/01/2023 |
2673/DPHE-12/14 |
5.03 |
4 |
Alipurduar Division |
000448BILL/00147/2022-202 |
BILL/00147/2022-2023 |
13/02/2023 |
DILIP MAHATO |
CONS. OF RESERVOIR (100M3), BOUNDARY WALL (80m), PUMP HOUSE (1No.), TUBE WELL (2 Nos.), RISING MAIN AND LAND DEVELOPMENT FOR TORSHA (Hat Khola Line, Naya Line, 3 No. Line (A) AND (B) and Khoyar line) 256 unit CHA SUNDARAI WATER SUPPLY SCHEME UNDER ALIPURD |
000448ORD/000028/2022-202 |
ORD/000028/2022-2023 |
282/ALD |
26/04/2022 |
30.44 |
Torsha Tea Garden Area Piped Water Supply Scheme in relation with Chaa Sundari Project. (SM/10039) |
30.44 |
3090/ALD |
13/02/2023 |
FAD/002441/2022 |
17/02/2023 |
3044/DPHE-12/14 |
30.44 |
5 |
Alipurduar Division |
000448BILL/00165/2024-202 |
BILL/00165/2024-2025 |
23/07/2024 |
HARI CONSTRUCTION |
Laying of new UPVC/DI pipeline for filling of Gap in the distribution system and laying of delivery line connection, supply of CIDF specials, land development works, construction of surface drain, pathway at 3rd TW site and other allied works in connectio |
000448ORD/000318/2023-202 |
ORD/000318/2023-2024 |
2410/ALD |
09/11/2023 |
16.52 |
AUGMENTATION OF BHOLARDABRI PIPE WATER SUPPLY SCHEME (SM/09883) |
12.21 |
2971/ALD |
27/08/2024 |
FAD/001648/2024 |
28/08/2024 |
FAD/001648/2024 |
12.21 |
6 |
Alipurduar Division |
000448BILL/00245/2024-202 |
BILL/00245/2024-2025 |
23/08/2024 |
SAMIRON PODDER |
Construction of 150 cum OHR as per Departmental Design and drawing, Tube well Boring by ODEX-165 method of drilling 1 nos. respectively at H/W site, Rising main and distribution line (part-1) for BANDAPANI TG AREA PWSS (ZONE-II) under Birpara Sub-Division |
000448ORD/000341/2022-202 |
ORD/000341/2022-2023 |
2250/ALD |
21/11/2022 |
19.64 |
Bandpani Tea Garden Areas Piped Water Supply Scheme. (SM/11483) |
19.64 |
2971/ALD |
27/08/2024 |
FAD/001648/2024 |
28/08/2024 |
FAD/001648/2024 |
19.64 |
7 |
Alipurduar Division |
000448BILL/00246/2024-202 |
BILL/00246/2024-2025 |
23/08/2024 |
TAPASH KUMAR BHOWMICK |
Supply of DI Special and CI Jeffy Coupling for Mathura TG Water Supply Scheme (SM/10172) of Alipurduar-I Block under Alipurduar Division P.H.E. Dte. |
000448ORD/000513/2023-202 |
ORD/000513/2023-2024 |
831/ALD |
14/03/2024 |
10.93 |
MATHURA TEA GARDEN AREA PIPED WATER SUPPLY SCHEME (SM/10172) |
10.93 |
2971/ALD |
27/08/2024 |
FAD/001648/2024 |
28/08/2024 |
FAD/001648/2024 |
10.93 |
8 |
Alipurduar Division |
000448BILL/00247/2024-202 |
BILL/00247/2024-2025 |
23/08/2024 |
BHAGWATI BHUJEL |
Repairing bottom dome, conical, shell wall etc. of existing Dalmore 350 cum OHR including protective and Decorative Acrylic exterior paint of Birpara Sub-Division under Alipurduar Division, P.H.E.Dte. (SM/07132) |
000448ORD/000508/2023-202 |
ORD/000508/2023-2024 |
826/ALD |
14/03/2024 |
4.79 |
FHTC under Jaldhara / Jalswapna including retrofitting of existing distribution system under DALMORE RAMJHORA T.G. Piped Water Supply Scheme (Phase-2) (SM/07132) |
4.79 |
2971/ALD |
27/08/2024 |
FAD/001648/2024 |
28/08/2024 |
FAD/001648/2024 |
4.79 |
9 |
Alipurduar Division |
000448BILL/00248/2024-202 |
BILL/00248/2024-2025 |
23/08/2024 |
M/S SSB CONSTRUCTION CO. |
Laying of new UPVC/DI pipeline for filling of Gap in the distribution system and laying of delivery line connection, land development works, construction of surface drain, pathway, supply of CIDF specials and other allied works in connection with the Pasc |
000448ORD/000337/2023-202 |
ORD/000337/2023-2024 |
2523/ALD |
24/11/2023 |
48.17 |
PASCHIM CHENGMARI PIPED WATER SUPPLY SCHEME (SM/13240) |
48.17 |
2971/ALD |
27/08/2024 |
FAD/001648/2024 |
28/08/2024 |
FAD/001648/2024 |
48.17 |
10 |
Alipurduar Division |
000448BILL/00254/2024-202 |
BILL/00254/2024-2025 |
27/08/2024 |
HARIDAS GHOSH |
Construction of tubewells (2 nos.) by Reverse rotary method of drilling, constructions of 150 Cum OHR at HW, Cons. of pump house and Boundary wall at HW site and 2nd site, Laying of rising main, part of distribution line and providing FHTC for Dalimpur |
000448ORD/000454/2023-202 |
ORD/000454/2023-2024 |
366/ALD |
31/01/2024 |
117.92 |
AUGMENTATION OF DALIMPUR PWSS (SM/18254) |
117.92 |
2971/ALD |
27/08/2024 |
FAD/001648/2024 |
28/08/2024 |
FAD/001648/2024 |
117.92 |
11 |
Alipurduar Division |
000448BILL/00255/2024-202 |
BILL/00255/2024-2025 |
27/08/2024 |
UNIVERSAL ENTERPRISES |
Construction of OHR 200cum for KUMARGRAM ZONE-III Water Supply Scheme under Alipurduar Division, PHE Dte. |
000448ORD/000257/2022-202 |
ORD/000257/2022-2023 |
1488/ALD |
05/09/2022 |
12.18 |
AUGMENTATION OF KUMARGRAM PIPED WATER SUPPLY SCHEME (SM/11985) |
12.18 |
2971/ALD |
27/08/2024 |
FAD/001648/2024 |
28/08/2024 |
FAD/001648/2024 |
12.18 |
12 |
Alipurduar Division |
000448BILL/00256/2024-202 |
BILL/00256/2024-2025 |
27/08/2024 |
KAMALESH ROY |
Construction of pathway, surface drain and chatal, land development, along with other allied works at Shrinathpur PWSS under Alipurduar Division, PHE Dte. |
000448ORD/000194/2023-202 |
ORD/000194/2023-2024 |
1470/ALD |
16/08/2023 |
4.56 |
SHRINATHPUR TEA GARDEN AREA PIPED WATER SUPPLY SCHEME (SM/11709) |
4.56 |
2971/ALD |
27/08/2024 |
FAD/001648/2024 |
28/08/2024 |
FAD/001648/2024 |
4.56 |
13 |
Alipurduar Division |
000448BILL/00257/2024-202 |
BILL/00257/2024-2025 |
27/08/2024 |
TAPASH KUMAR BHOWMICK |
Supply of CIDF & CISS Pipes and specials for Turturi Water Supply Scheme under Alipurduar Division, PHE Dte. |
000448ORD/000219/2023-202 |
ORD/000219/2023-2024 |
1579/ALD |
24/08/2023 |
2.32 |
TURTURI PIPED WATER SUPPLY SCHEME. (SM/14219) |
2.32 |
2971/ALD |
27/08/2024 |
FAD/001648/2024 |
28/08/2024 |
FAD/001648/2024 |
2.32 |
14 |
Alipurduar Division |
000448BILL/00600/2023-202 |
BILL/00600/2023-2024 |
29/02/2024 |
HARIDAS GHOSH |
Supply of CIPE Special & CI Jeffy Coupling for Dakshin Paitkapara Water Supply Scheme under Alipurduar Division P.H.E. Dte. (699/ALD DT:08/06/2022)
Construction of Pump House, Boundary Wall, Tube well Boring by Reverse Rotary Method of drilling at H/W si |
000448 |
|
610/ALD |
29/02/2024 |
6.95 |
DAKSHIN PAITKAPARA PIPED WATER SUPPLY SCHEME (SM/10174) |
6.95 |
614/ALD |
29/02/2024 |
FAD/004010/2023 |
01/03/2024 |
FAD/004010/2023 |
6.95 |
15 |
Alipurduar Division |
000448BILL/00682/2023-202 |
BILL/00682/2023-2024 |
23/03/2024 |
APSARI BHOWMICK |
Extension work order for Hiring of Diesel vehicle Maxi Cab(At least 7 seater) for Executive Engineer, Alipurduar Division under Alipurduar Division, PHE Dte.( 01.04.2021 to 30.06.2021) |
000448ORD/000609/2020-202 |
ORD/000609/2020-2021 |
3051/ALD |
31/03/2021 |
0.54 |
REJUVENATION OF BIRPARA(APD) WATER SUPPLY SCHEME (SM/09897) |
0.54 |
1020/ALD |
23/03/2024 |
FAD/004430/2023 |
27/03/2024 |
FAD/004430/2023 |
0.54 |