1 |
Malda Division |
000118BILL/00707/2024-202 |
BILL/00707/2024-2025 |
24/10/2024 |
DEBAPRIYA SAHA |
Design, Fabrication, Supplying, Installation, Commissioning,and 3 (three) months Trial Run and 40 cum/hr. capacity of Iron Elimination Plants (Pressure type) with provision of polishing unit alongwith Construction of 3.60 mtr.X 3.00 mtr Blower Room in co |
000118ORD/000609/2023-202 |
ORD/000609/2023-2024 |
4113/MD |
10/10/2023 |
15.43 |
Source Augmentation of Nemua Piped Water Supply Scheme under Malda Division, PHE Dte. (SM/15102) |
15.43 |
5481/MD |
24/10/2024 |
FAD/002388/2024 |
28/10/2024 |
FAD/002388/2024 |
15.43 |