F4- Undisbursed Fund

Rs. in Lakh
SL No Division Unique Bill No System Bill No Bill Date Agency Work Name Unique Order No System Order No Order Memo No Order Date Bill Amount Scheme Requisition Amount Requisition Memo No Requisition Memo Date System Allotment No Allotment Date Allotment Number Allotment Amount
56 1,523.87 # 1,449.26 # 1,436.06
1 Malda Division 000118BILL/00429/2022-202 BILL/00429/2022-2023 23/02/2023 A. L. ENGINEERING SOLUTION Acceptance cum formal work order for Sinking of (250mm. Dia. x 200 mm. dia.) Big dia. Tube Well (120 Mtr. Deep) by D.R. Rig method using P.V.C. pipe and Gravel Filter including supply of Materials at MEKPUR Piped Water Supply Scheme (Tube Well No-4) of O 000118ORD/000377/2022-202 ORD/000377/2022-2023 2703/MD 17/11/2022 8.5 Source Augmentation of Mekpur Piped Water Supply Scheme under Malda Division, PHE Dte. (SM/12763) 8.5 1002/MD 09/03/2023 FAD/002688/2022 13/03/2023 3334/DPHE-12/14 8.5
2 Malda Division 000118BILL/00591/2024-202 BILL/00591/2024-2025 24/09/2024 S. R. ENTERPRISE Acceptance cum formal work order for Construction of 3.60 mtr.X 3.00 mtr Switch Room cum chlorine room with Water Supply and sanitary arrangement at 2nd Tube Well site. of JOTGOPAL Water Supply Scheme at Englishbazar Block of Malda District under Malda D 000118ORD/000484/2022-202 ORD/000484/2022-2023 1132/MD 20/03/2023 4.12 AUGMENTATION OF JOTGOPAL Piped Water Supply Scheme (SM/14190) 4.12 4946/MD 24/09/2024 FAD/002060/2024 26/09/2024 FAD/002060/2024 4.12
3 Malda Division 000118BILL/00592/2024-202 BILL/00592/2024-2025 24/09/2024 SHANKAR PRASAD BHAGAT Acceptance cum formal work order for Construction of 2 (two) Nos 3.60 mtr.X 3.00 mtr Switch Room cum chlorine room with Water Supply and sanitary arrangement in connection with source Augmentation of Kadirpur Piped Water Supply Scheme at Habibpur Block of 000118ORD/000024/2023-202 ORD/000024/2023-2024 1714/MD 20/04/2023 7.32 Source Augmentation of Kadirpur Piped Water Supply Scheme under Malda Division, PHE Dte. (SM/15111) 7.32 4946/MD 24/09/2024 FAD/002060/2024 26/09/2024 FAD/002060/2024 7.32
4 Malda Division 000118BILL/00593/2024-202 BILL/00593/2024-2025 24/09/2024 S. M. BUILDER Construction of 3.60 mtr.X 3.00 mtr Switch Room cum chlorine room corresponding to Tube Well No.- 3 at Gauria PWSS under Chanchal-I Block under Malda Division, PHE Dte, Govt. of West Bengal. 000118ORD/000892/2023-202 ORD/000892/2023-2024 271/MD 11/01/2024 4.18 GAURIA Piped Water Supply Scheme. (SM/12079) 4.18 4946/MD 24/09/2024 FAD/002060/2024 26/09/2024 FAD/002060/2024 4.18
5 Malda Division 000118BILL/00594/2024-202 BILL/00594/2024-2025 24/09/2024 A. L. ENGINEERING SOLUTION Acceptance cum formal work order for Construction of 3.60 mtr.X 3.00 mtr Switch Room cum chlorine room with Water Supply and sanitary arrangement in connection with source Augmentation of Dahara Piped Water Supply Scheme at Harishchandrapur-II Block of Ma 000118ORD/000750/2022-202 ORD/000750/2022-2023 1298/MD 23/03/2023 4.18 Source Augmentation of Dahara Piped Water Supply Scheme under Malda Division, PHE Dte. (SM/15105) 4.18 4946/MD 24/09/2024 FAD/002060/2024 26/09/2024 FAD/002060/2024 4.18
6 Malda Division 000118BILL/00595/2024-202 BILL/00595/2024-2025 24/09/2024 NABODAYA MULTIPURPOSE CO-OPERA Acceptance cum formal work order for Annual maintenance of Manikchak Sub-District Laboratory under Malda Division, PHE Dte. (Period from 06/01/2023 to 05/01/2024) 000118ORD/000440/2022-202 ORD/000440/2022-2023 196/RWS 05/01/2023 0.73 Operational Charges of PHED & NGO Managed Laboratories Related to water quality monitoring & surveillance under Jal Jeevan Mission. (SM/12272) 0.73 4946/MD 24/09/2024 FAD/002060/2024 26/09/2024 FAD/002060/2024 0.73
7 Malda Division 000118BILL/00596/2024-202 BILL/00596/2024-2025 24/09/2024 NABODAYA MULTIPURPOSE CO-OPERA Acceptance cum formal work order for Annual maintenance of Sanskrity-O-Samaj Unnayan Parishad Sub-District Laboratory. (Period from 06/01/2023 to 05/01/2024) 000118ORD/000444/2022-202 ORD/000444/2022-2023 200/RWS 05/01/2023 0.74 Operational Charges of PHED & NGO Managed Laboratories Related to water quality monitoring & surveillance under Jal Jeevan Mission. (SM/12272) 0.74 4946/MD 24/09/2024 FAD/002060/2024 26/09/2024 FAD/002060/2024 0.74
8 Malda Division 000118BILL/00597/2024-202 BILL/00597/2024-2025 24/09/2024 NABODAYA MULTIPURPOSE CO-OPERA Acceptance cum formal work order for Annual maintenance of Gazole Sub-District Laboratory under Malda Division, PHE Dte. (Period from 06/01/2023 to 05/01/2024) 000118ORD/000441/2022-202 ORD/000441/2022-2023 197/RWS 05/01/2023 0.73 Operational Charges of PHED & NGO Managed Laboratories Related to water quality monitoring & surveillance under Jal Jeevan Mission. (SM/12272) 0.73 4946/MD 24/09/2024 FAD/002060/2024 26/09/2024 FAD/002060/2024 0.73
9 Malda Division 000118BILL/00598/2024-202 BILL/00598/2024-2025 24/09/2024 NABODAYA MULTIPURPOSE CO-OPERA Acceptance cum formal work order for Annual maintenance of Balupur WTP Sub-District Laboratory under Malda Division, PHE Dte. (Period from 06/01/2023 to 05/01/2024) 000118ORD/000443/2022-202 ORD/000443/2022-2023 199/RWS 05/01/2023 0.72 Operational Charges of PHED & NGO Managed Laboratories Related to water quality monitoring & surveillance under Jal Jeevan Mission. (SM/12272) 0.72 4946/MD 24/09/2024 FAD/002060/2024 26/09/2024 FAD/002060/2024 0.72
10 Malda Division 000118BILL/00599/2024-202 BILL/00599/2024-2025 24/09/2024 NABODAYA MULTIPURPOSE CO-OPERA Acceptance cum formal work order for Annual maintenance of Chanchal Sub-District Laboratory under Malda Division, PHE Dte. (Period from 06/01/2023 to 05/01/2024) 000118ORD/000439/2022-202 ORD/000439/2022-2023 195/RWS 05/01/2023 0.73 Operational Charges of PHED & NGO Managed Laboratories Related to water quality monitoring & surveillance under Jal Jeevan Mission. (SM/12272) 0.73 4946/MD 24/09/2024 FAD/002060/2024 26/09/2024 FAD/002060/2024 0.73
11 Malda Division 000118BILL/00600/2024-202 BILL/00600/2024-2025 24/09/2024 NABODAYA MULTIPURPOSE CO-OPERA Acceptance cum formal work order for Annual maintenance of Bulbulchandi Sub-District Laboratory under Malda Division, PHE Dte. (Period from 06/01/2023 to 05/01/2024) 000118ORD/000445/2022-202 ORD/000445/2022-2023 201/RWS 05/01/2023 0.74 Operational Charges of PHED & NGO Managed Laboratories Related to water quality monitoring & surveillance under Jal Jeevan Mission. (SM/12272) 0.74 4946/MD 24/09/2024 FAD/002060/2024 26/09/2024 FAD/002060/2024 0.74
12 Malda Division 000118BILL/00605/2024-202 BILL/00605/2024-2025 24/09/2024 HANNAN BUILDERS PVT. LTD. Formal work order for the work of Laying distribution pipe line of KHARBA and it's adjoining mouzas Piped Water Supply Scheme at Chanchal-I Block of Malda district under Malda Division, PHE Dte. Govt of West Bengal. 000118ORD/000068/2023-202 ORD/000068/2023-2024 2033/MD 19/05/2023 96.63 KHARBA PIPED WATER SUPPLY SCHEME. (SM/13793) 96.63 4970/MD 26/09/2024 FAD/002125/2024 27/09/2024 FAD/002125/2024 96.63
13 Malda Division 000118BILL/00606/2024-202 BILL/00606/2024-2025 24/09/2024 ARUN KUMAR DAS Continuation work order for Hiring of inspection Vehicle (Non-Air-Condition, Bharat Stage-III on or after 01/05/2008 with Diesel/LPG/CNG Engine) in perfect good condition of performing a very long jurney and should be covered any where without any trouble 000118ORD/000922/2023-202 ORD/000922/2023-2024 1011/MSD 29/12/2023 0.34 Providing Functional Household Tap Connection (FHTC) in connection with Jal Jeevan Mission (JJM and JAL SWAPNA) under command area of different Water Supply Schemes at different Blocks under Malda Division, PHE Dte (SM/07973) 0.34 5176/MD 30/09/2024 FAD/002224/2024 03/10/2024 FAD/002224/2024 0.34
14 Malda Division 000118BILL/00607/2024-202 BILL/00607/2024-2025 24/09/2024 ARUN KUMAR DAS Continuation work order for Hiring of inspection Vehicle (Non-Air-Condition, Bharat Stage-III on or after 01/05/2008 with Diesel/LPG/CNG Engine) in perfect good condition of performing a very long jurney and should be covered any where without any trouble 000118ORD/000922/2023-202 ORD/000922/2023-2024 1011/MSD 29/12/2023 0.35 Providing Functional Household Tap Connection (FHTC) in connection with Jal Jeevan Mission (JJM and JAL SWAPNA) under command area of different Water Supply Schemes at different Blocks under Malda Division, PHE Dte (SM/07973) 0.35 5176/MD 30/09/2024 FAD/002224/2024 03/10/2024 FAD/002224/2024 0.35
15 Malda Division 000118BILL/00608/2024-202 BILL/00608/2024-2025 24/09/2024 ARUN KUMAR DAS Continuation work order for Hiring of inspection Vehicle (Non-Air-Condition, Bharat Stage-III on or after 01/05/2008 with Diesel/LPG/CNG Engine) in perfect good condition of performing a very long jurney and should be covered any where without any trouble 000118ORD/000922/2023-202 ORD/000922/2023-2024 1011/MSD 29/12/2023 0.29 Providing Functional Household Tap Connection (FHTC) in connection with Jal Jeevan Mission (JJM and JAL SWAPNA) under command area of different Water Supply Schemes at different Blocks under Malda Division, PHE Dte (SM/07973) 0.29 5176/MD 30/09/2024 FAD/002224/2024 03/10/2024 FAD/002224/2024 0.29
16 Malda Division 000118BILL/00609/2024-202 BILL/00609/2024-2025 24/09/2024 ARUN KUMAR DAS Continuation work order for Hiring of inspection Vehicle (Non-Air-Condition, Bharat Stage-III on or after 01/05/2008 with Diesel/LPG/CNG Engine) in perfect good condition of performing a very long jurney and should be covered any where without any trouble 000118ORD/000922/2023-202 ORD/000922/2023-2024 1011/MSD 29/12/2023 0.3 Providing Functional Household Tap Connection (FHTC) in connection with Jal Jeevan Mission (JJM and JAL SWAPNA) under command area of different Water Supply Schemes at different Blocks under Malda Division, PHE Dte (SM/07973) 0.3 5176/MD 30/09/2024 FAD/002224/2024 03/10/2024 FAD/002224/2024 0.3
17 Malda Division 000118BILL/00614/2024-202 BILL/00614/2024-2025 25/09/2024 SUDEB KARMAKAR Engagement of personnel for testing, entry, collection of water and Double Beam Atomic Absorption Spectrophotometer (AAS) for Malda District water Testing Laboratory under Malda Division, PHE Dte. in the district of Malda (Period from 01/10/2023 to 31/03/ 000118ORD/000556/2023-202 ORD/000556/2023-2024 3727/MD 26/09/2023 4.59 Operational Charges of PHED & NGO Managed Laboratories Related to water quality monitoring & surveillance under Jal Jeevan Mission. (SM/12272) 4.59 4970/MD 26/09/2024 FAD/002125/2024 27/09/2024 FAD/002125/2024 4.59
18 Malda Division 000118BILL/00616/2024-202 BILL/00616/2024-2025 25/09/2024 BANIK BROTHERS Construction of Boundary Wall at Head Work site of Talpukur Water Supply Scheme under Habibpur Block under Malda Division, PHE Dte. in the district of Malda. 000118ORD/000883/2023-202 ORD/000883/2023-2024 159/MD 08/01/2024 21.82 TALPUKUR Piped Water Supply Scheme (SM/12189) 21.82 4970/MD 26/09/2024 FAD/002125/2024 27/09/2024 FAD/002125/2024 21.82
19 Malda Division 000118BILL/00617/2024-202 BILL/00617/2024-2025 25/09/2024 M/S PARIMAL DAS Formal work order for the work of Augmentation of UTTAR CHANDIPUR ZONE-I Piped Water Supply Scheme at Manikchak Dev. Block of Malda district under Malda Division, PHE Dte. 000118ORD/000025/2023-202 ORD/000025/2023-2024 1752/MD 26/04/2023 60.33 Augmentation of Uttar Chandipur Zone- I Piped Water Supply Scheme under Malda Division, PHE Dte. (SM/16053) 60.33 4970/MD 26/09/2024 FAD/002125/2024 27/09/2024 FAD/002125/2024 60.33
20 Malda Division 000118BILL/00618/2024-202 BILL/00618/2024-2025 25/09/2024 MILLENNIUM ENTERPRISR Formal work order for the work of Installation of Stand-Alone Community Purification Plant (CWPP) for School at Mangalpura, Dhumpur & Baidyapur GP of Habibpur Dev. Block under Malda Division, PHE Dte. 000118ORD/000527/2022-202 ORD/000527/2022-2023 556/MD 09/02/2023 42.16 Installation of Stand-Alone Community Purification Plant at Schools(94 nos) of Habibpur Dev. Block, Malda under Malda Division, PHE Dte. (SM/10386) 42.16 4970/MD 26/09/2024 FAD/002125/2024 27/09/2024 FAD/002125/2024 42.16
21 Malda Division 000118BILL/00619/2024-202 BILL/00619/2024-2025 26/09/2024 HANNAN BUILDERS PVT. LTD. Formal work order for the work of Implementation of PARAHAR Piped Water Supply Scheme at Gazole Dev. Block of Malda district under Malda Division, PHE Dte., Govt. of West Bengal. 000118ORD/000316/2023-202 ORD/000316/2023-2024 2951/MD 02/08/2023 125.26 PARAHAR PWSS (SM/18432) 125.26 4970/MD 26/09/2024 FAD/002125/2024 27/09/2024 FAD/002125/2024 125.26
22 Malda Division 000118BILL/00620/2024-202 BILL/00620/2024-2025 26/09/2024 PRADIP KUMAR DAS Formal work order for the work of Laying of Distribution pipe line in connection with Augmentation of Uttar Harishchandrapur Zone-I Water Supply Scheme under Malda Division PHE. Dte in The District of Malda. (2ND Call) 000118ORD/000134/2022-202 ORD/000134/2022-2023 1791/MD 01/08/2022 38.17 Augmentation of Uttar Harishandropur piped water supply scheme. (SM/10291) 38.17 4970/MD 26/09/2024 FAD/002125/2024 27/09/2024 FAD/002125/2024 38.17
23 Malda Division 000118BILL/00621/2024-202 BILL/00621/2024-2025 26/09/2024 M/S SABANA CONSTRUCTION Providing Functional Household Tap Connection (FHTC) in connection with Jal Jeevan Mission (JJM) under command area of Tulshihatta Zone-I Water Supply Scheme at Harishchandrapur-I Dev. Block under Malda Division, PHE Dte. in the district of Malda. 000118ORD/000455/2023-202 ORD/000455/2023-2024 3372/MD 29/08/2023 16.44 Ground Water Based for Tulshihatta Zone-I Piped Water Supply Scheme under Malda Division, PHE Dte. (SM/11590) 16.44 4970/MD 26/09/2024 FAD/002125/2024 27/09/2024 FAD/002125/2024 16.44
24 Malda Division 000118BILL/00622/2024-202 BILL/00622/2024-2025 26/09/2024 R. K. ENTERPRISE Formal work order for the work of Implementation of NABAGRAM Water Supply Scheme at Chanchal-I Block of Malda district under Malda Division, PHE Dte., Govt. of West Bengal. 000118ORD/000027/2023-202 ORD/000027/2023-2024 1838/MD 02/05/2023 76.81 NABAGRAM Piped Water Supply Scheme (SM/12767) 76.81 4970/MD 26/09/2024 FAD/002125/2024 27/09/2024 FAD/002125/2024 76.81
25 Malda Division 000118BILL/00624/2024-202 BILL/00624/2024-2025 26/09/2024 PROSANTA MANDAL Bill for Festival Bonus-2024 for the Assistant Engineer, Malda Division, PHE Dte. 000118 4971/MD 26/09/2024 0.06 Engagement of Contractual Assistant Engineers engaged in various divisions related to Support Activity under Jal Jeevan Mission (SM/11975) 0.06 4976/MD 26/09/2024 FAD/002125/2024 27/09/2024 FAD/002125/2024 0.06
26 Malda Division 000118BILL/00626/2024-202 BILL/00626/2024-2025 26/09/2024 VISCOUS ENGINEERS PVT. LTD. Formal work order for the work of Implementation of PARO Piped Water Supply Scheme at Harishchandrapur-I Block of Malda district under Malda Division, PHE Dte., Govt. of West Bengal. 000118ORD/000309/2023-202 ORD/000309/2023-2024 2873/MD 26/07/2023 112.13 PARO PWSS (SM/12195) 112.13 4981/MD 26/09/2024 FAD/002125/2024 27/09/2024 FAD/002125/2024 112.13
27 Malda Division 000118BILL/00628/2024-202 BILL/00628/2024-2025 27/09/2024 UTTAM KUMAR GHOSH Formal work order for Augmentation of TILASAN Piped water supply scheme for the work of Geotechnical Study,construction of 200 Cum RCC OHR,Laying Distribution of pipe line and providing Functional Household Tap connection (FHTC) within Habibpur Block und 000118ORD/000004/2022-202 ORD/000004/2022-2023 996/MD 22/04/2022 26.1 Augmentation of Tilasan Piped water supply scheme (SM/09567) 26.1 5072/MD 27/09/2024 FAD/002160/2024 30/09/2024 FAD/002160/2024 26.1
28 Malda Division 000118BILL/00629/2024-202 BILL/00629/2024-2025 27/09/2024 CHARU CONSTRUCTION Construction of Boundary Wall at 2nd Tubewell Site of Kaluari Water Supply Scheme under Old Malda Block under Malda Division, PHE Dte. in the district of Malda. 000118ORD/001029/2023-202 ORD/001029/2023-2024 1255/MD 15/03/2024 5.8 KALUARI PWSS (SM/18427) 5.8 5080/MD 27/09/2024 FAD/002160/2024 30/09/2024 FAD/002160/2024 5.8
29 Malda Division 000118BILL/00630/2024-202 BILL/00630/2024-2025 27/09/2024 SUBHAS CHANDRA KESHARI Formal work order for the work of Laying of Distribution pipe line in connection with Augmentation of Kushida Pipe Water Supply Scheme at Harishchandrapur-I Block in the District of Malda under Malda Division P.H.E. Dte. 000118ORD/000011/2023-202 ORD/000011/2023-2024 1568/MD 10/04/2023 43.83 Augmentation of Khusida Piped Water Supply Scheme (SM/10397) 43.83 5080/MD 27/09/2024 FAD/002160/2024 30/09/2024 FAD/002160/2024 43.83
30 Malda Division 000118BILL/00631/2024-202 BILL/00631/2024-2025 27/09/2024 SUBHAS CHANDRA KESHARI Laying of Distribution pipe line in connection with Augmentation of Uttar Rampur Mouza (JL-36) under KUSHIDA Piped Water Supply Scheme at Harishchandrapur-I Block of Malda District under Malda Division, PHE Dte., Govt. of West Bengal. 000118ORD/000763/2023-202 ORD/000763/2023-2024 5324/MD 27/12/2023 18.97 Augmentation of Khusida Piped Water Supply Scheme (SM/10397) 18.97 5080/MD 27/09/2024 FAD/002160/2024 30/09/2024 FAD/002160/2024 18.97
31 Malda Division 000118BILL/00636/2024-202 BILL/00636/2024-2025 28/09/2024 HANNAN BUILDERS PVT. LTD. Formal work order for the work of Implementation of CHAKSUKUR Piped Water Supply at Habibpur Dev. Block in the District Malda under Malda Division, PHE Dte. Govt. of West Bengal. 000118ORD/000661/2022-202 ORD/000661/2022-2023 1035/MD 13/03/2023 86.3 CHAKSUKUR PIPED WATER SUPPLY SCHEME. (SM/13719) 86.3 5089/MD 30/09/2024 FAD/002192/2024 01/10/2024 FAD/002192/2024 86.3
32 Malda Division 000118BILL/00637/2024-202 BILL/00637/2024-2025 30/09/2024 PROSANTA MANDAL Monthly Remuneration of Prosanta Mandal, Contractual Assistant Engineer (Civil) for the month of September 2024 000118 5160/MD 30/09/2024 0.28 Engagement of Contractual Assistant Engineers engaged in various divisions related to Support Activity under Jal Jeevan Mission (SM/11975) 0.28 5162/MD 30/09/2024 FAD/002192/2024 01/10/2024 FAD/002192/2024 0.28
33 Malda Division 000118BILL/00638/2024-202 BILL/00638/2024-2025 30/09/2024 KANAN CONSTRUCTION ENTERPRISE Formal work order for the work of Augmentation of KARIALI ZONE-I Piped Water Supply Scheme at Harishchandrapur-II Block of Malda district under Malda Division, PHE Dte., Govt. of West Bengal. 000118ORD/000226/2023-202 ORD/000226/2023-2024 2681/MD 13/07/2023 50.32 Ground Water Based for Kariali Zone-I Piped Water Supply Scheme under Malda Division, PHE Dte. (SM/11588) 50.32 5162/MD 30/09/2024 FAD/002192/2024 01/10/2024 FAD/002192/2024 50.32
34 Malda Division 000118BILL/00639/2024-202 BILL/00639/2024-2025 30/09/2024 M/S /FAIZUL HAQUE BISWAS Interconnection between new Tube Well and Existing UPVC/DI/HDPE pipe line in connection with Source Augmentation of Kendua Piped Water Supply Scheme at Chanchal-I Block of Malda District under Malda Division, PHE Dte. Govt. of West Bengal. 000118ORD/000280/2024-202 ORD/000280/2024-2025 3231/MD 28/06/2024 7.36 Source Augmentation of Kendua Piped Water Supply Scheme under Malda Division, PHE Dte. (SM/15106) 7.36 5162/MD 30/09/2024 FAD/002192/2024 01/10/2024 FAD/002192/2024 7.36
35 Malda Division 000118BILL/00640/2024-202 BILL/00640/2024-2025 30/09/2024 M/S. NAYAMEE ENGINEERING & CON Laying of Rising Main including Specials and Valves for KHARBA Piped Water Supply Scheme at Chanchal-I Block of Malda District under Malda Division, PHE Dte, Govt. of West Bengal. 000118ORD/000963/2023-202 ORD/000963/2023-2024 716/MD 09/02/2024 4.43 KHARBA PIPED WATER SUPPLY SCHEME. (SM/13793) 4.43 5162/MD 30/09/2024 FAD/002192/2024 01/10/2024 FAD/002192/2024 4.43
36 Malda Division 000118BILL/00641/2024-202 BILL/00641/2024-2025 30/09/2024 SHREE BISHNU CONSTRUCTION Formal work order for the work of Augmentation of JOTGOPAL Piped Water Supply Scheme at Englishbazar Block of Malda district under Malda Division, PHE Dte., Govt. of West Bengal. 000118ORD/000235/2023-202 ORD/000235/2023-2024 2710/MD 14/07/2023 48.98 AUGMENTATION OF JOTGOPAL Piped Water Supply Scheme (SM/14190) 48.98 5174/MD 30/09/2024 FAD/002224/2024 03/10/2024 FAD/002224/2024 48.98
37 Malda Division 000118BILL/00642/2024-202 BILL/00642/2024-2025 30/09/2024 M/S AMIT KUMAR GUPTA Design, Fabrication, Supplying, Installation, Commissioning,and 3 (three) months Trial Run and 25 cum/hr. capacity of Iron Elimination Plants (Pressure type) with provision of polishing unit alongwith Construction of 3.60 mtr.X 3.00 mtr Blower Room in co 000118ORD/000608/2023-202 ORD/000608/2023-2024 4112/MD 10/10/2023 13.29 Source Augmentation of Mabrakpur Piped Water Supply Scheme under Malda Division, PHE Dte. (SM/15080) 13.29 5174/MD 30/09/2024 FAD/002224/2024 03/10/2024 FAD/002224/2024 13.29
38 Malda Division 000118BILL/00643/2024-202 BILL/00643/2024-2025 30/09/2024 UTTAM KUMAR GHOSH Formal work order for the work of Augmentation of Gazole Zone-IV Piped Water Supply Scheme at Gazole Block of Malda District under Malda Division, PHE Dte, Govt. of West Bengal. 000118ORD/000598/2023-202 ORD/000598/2023-2024 4326/MD 16/10/2023 49.89 Augmentation of Ground Water Based GAZOLE (Zone-I, II, III & IV) Piped Water Supply Scheme under Malda Division, PHE Dte. (SM/18558) 49.89 5174/MD 30/09/2024 FAD/002224/2024 03/10/2024 FAD/002224/2024 49.89
39 Malda Division 000118BILL/00644/2024-202 BILL/00644/2024-2025 30/09/2024 TARUN KUMAR DEY Acceptance cum formal work order for Extension of Pipe line and replacing of damage uPVC pipe line by different dia UPVC pipe for MABARAKPUR Piped Water Supply Scheme (Moua Mabrakpur, JL No.- 123 & Mouza-Muchia, JL No. 124) at Old Malda Dev. Block of M 000118ORD/000699/2022-202 ORD/000699/2022-2023 1156/MD 20/03/2023 1.89 Source Augmentation of Mabrakpur Piped Water Supply Scheme under Malda Division, PHE Dte. (SM/15080) 1.89 5174/MD 30/09/2024 FAD/002224/2024 03/10/2024 FAD/002224/2024 1.89
40 Malda Division 000118BILL/00645/2024-202 BILL/00645/2024-2025 30/09/2024 M/S TAPAS KUMAR CHAKRABORTY & Formal work order for the work of Implementation of PARAIL Piped Water Supply Scheme at Gazole Dev. Block of Malda district under Malda Division, PHE Dte., Govt. of West Bengal. 000118ORD/000261/2023-202 ORD/000261/2023-2024 3008/MD 07/08/2023 129.47 PARAIL PWSS (SM/18431) 129.47 5174/MD 30/09/2024 FAD/002224/2024 03/10/2024 FAD/002224/2024 129.47
41 Malda Division 000118BILL/00647/2024-202 BILL/00647/2024-2025 30/09/2024 A. B. CONSTRUCTION Providing Functional Household Tap Connection (FHTC) in connection with Jal Jeevan Mission (JJM) under command area of DALLA Water Supply Scheme at Habibpur Dev. Block under Malda Division, PHE Dte. in the district of Malda. 000118ORD/000718/2023-202 ORD/000718/2023-2024 4767/MD 05/12/2023 13.2 Providing Functional Household Tap Connection (FHTC) in connection with Jal Jeevan Mission (JJM and JAL SWAPNA) under command area of different Water Supply Schemes at different Blocks under Malda Division, PHE Dte (SM/07973) 13.2 5176/MD 30/09/2024 FAD/002224/2024 03/10/2024 FAD/002224/2024 0
42 Malda Division 000118BILL/00648/2024-202 BILL/00648/2024-2025 30/09/2024 J. M. CONSTRUCTION Construction of Boundary Wall of Tubewell site at Dalla Mouza of Dalla Water Supply Scheme under Habibpur Block under Malda Division, PHE Dte. in the district of Malda. 000118ORD/001018/2023-202 ORD/001018/2023-2024 1186/MD 14/03/2024 9.92 Source Augmentation of Dalla Piped Water Supply Scheme under Malda Division, PHE Dte. (SM/15079) 9.92 5176/MD 30/09/2024 FAD/002224/2024 03/10/2024 FAD/002224/2024 9.92
43 Malda Division 000118BILL/00650/2024-202 BILL/00650/2024-2025 30/09/2024 BINA CONSTRUCTION Acceptance cum formal work order for Laying of Distribution of UPVC Pipeline of JAMALPUR Piped Water Supply Scheme at Habibpur Block of Malda District under Malda Division, PHE Dte., Govt. of West Bengal. 000118ORD/000667/2022-202 ORD/000667/2022-2023 1061/MD 15/03/2023 10.32 JAMALPUR Piped Water Supply Scheme. (SM/12879) 10.32 5176/MD 30/09/2024 FAD/002224/2024 03/10/2024 FAD/002224/2024 10.32
44 Malda Division 000118BILL/00652/2024-202 BILL/00652/2024-2025 01/10/2024 S. N. CONSTRUCTION Construction of Boundary Wall at Goalpara Mouza under Mekpur Water Supply Scheme under Old Malda Block under Malda Division, PHE Dte. in the district of Malda. 000118ORD/001012/2023-202 ORD/001012/2023-2024 1514/MD 16/03/2024 9.01 Source Augmentation of Mekpur Piped Water Supply Scheme under Malda Division, PHE Dte. (SM/12763) 9.01 5282/MD 01/10/2024 FAD/002224/2024 03/10/2024 FAD/002224/2024 9.01
45 Malda Division 000118BILL/00653/2024-202 BILL/00653/2024-2025 01/10/2024 RAHANUL ALAM Providing Functional Household Tap Connection (FHTC) in connection with Jal Jeevan Mission (JJM) under command area of DAKSHIN MAHENDRAPUR Water Supply Scheme at Harishchandrapur-I Dev. Block under Malda Division, PHE Dte. in the district of Malda. 000118ORD/000912/2023-202 ORD/000912/2023-2024 385/MD 17/01/2024 8.3 Providing Functional Household Tap Connection (FHTC) in connection with Jal Jeevan Mission (JJM and JAL SWAPNA) under command area of different Water Supply Schemes at different Blocks under Malda Division, PHE Dte (SM/07973) 8.3 5282/MD 01/10/2024 FAD/002224/2024 03/10/2024 FAD/002224/2024 8.3
46 Malda Division 000118BILL/00654/2024-202 BILL/00654/2024-2025 01/10/2024 M.S. ENTERPRISE Acceptance cum formal work order for Construction of 3.60 mtr.X 3.00 mtr Switch Room cum chlorine room with Water Supply and sanitary arrangement in connection with source Augmentation of Bhabuk Piped Water Supply Scheme at Habibpur Block of Malda Distric 000118ORD/000727/2022-202 ORD/000727/2022-2023 1201/MD 21/03/2023 4.12 Source Augmentation of Bhabuk Water Supply Scheme of Habibpur Block under Malda Division P.H.E Dte. Malda (SM/12762) 4.12 5230/MD 01/10/2024 FAD/002224/2024 03/10/2024 FAD/002224/2024 4.12
47 Malda Division 000118BILL/00655/2024-202 BILL/00655/2024-2025 01/10/2024 M/S A. B. CONSTRUCTION Acceptance cum formal work order for Construction of 3.60 mtr.X 3.00 mtr Switch Room cum chlorine room with Water Supply and sanitary arrangement in connection with source Augmentation of Sailpur Piped Water Supply Scheme at Englishbazar Block of Malda Di 000118ORD/000759/2022-202 ORD/000759/2022-2023 1306/MD 23/03/2023 4.12 Source Augmentation of Sailpur Piped Water Supply Scheme under Malda Division, PHE Dte. (SM/15108) 4.12 5230/MD 01/10/2024 FAD/002224/2024 03/10/2024 FAD/002224/2024 4.12
48 Malda Division 000118BILL/00656/2024-202 BILL/00656/2024-2025 01/10/2024 M/S GHOSH CONSTRUCTION Construction of Boundary Wall at Bhabuk Mouza under Gun Sankrul Water Supply Scheme under Old Malda Block under Malda Division, PHE Dte. in the district of Malda. 000118ORD/001025/2023-202 ORD/001025/2023-2024 1251/MD 15/03/2024 9.54 Source Augmentation of Gun Sankrul Piped Water Supply Scheme under Malda Division, PHE Dte. (SM/12761) 9.54 5288/MD 01/10/2024 FAD/002224/2024 03/10/2024 FAD/002224/2024 9.54
49 Malda Division 000118BILL/00657/2024-202 BILL/00657/2024-2025 01/10/2024 M/S GOUTAM CHAKRABORTY Formal work order for the work of Installation of Stand-Alone Community Purification Plant (CWPP) at different Anganwadi Centres (AWCs) of G.P.- Mahananda Tola, Belaimari, Bhado, Samsi, Chandmoni-I & Chandmoni-II in Ratua-I Dev. Block, Malda under Malda 000118ORD/000008/2022-202 ORD/000008/2022-2023 1133/MD 20/05/2022 55.46 INSTALLATION OF 90 Nos. STAND ALONE COMMUNITY PURIFICATION PLANT (CWPP) AT ANGANWADI CENTRES(AWCs) OF GP-MAHANANDATOLA,BELAIMARI,BHADO,SAMSI,CHANDMONI-I& CHANDMONI-II IN RATUA-I DEV BLOCK,MALDA UNDER MALDA DIVISION,PHE DTE. (SM/10245) 3.96 5288/MD 01/10/2024 FAD/002224/2024 03/10/2024 FAD/002224/2024 3.96
50 Malda Division 000118BILL/00658/2024-202 BILL/00658/2024-2025 01/10/2024 M/S N. N. ENTERPRISE Construction of Boundary Wall at Head Work site of Alinagar Water Supply Scheme under Gazole Block under Malda Division, PHE Dte. in the district of Malda. 000118ORD/000882/2023-202 ORD/000882/2023-2024 158/MD 08/01/2024 14.51 ALINAGAR Piped Water Supply Scheme (SM/13431) 14.51 5288/MD 01/10/2024 FAD/002224/2024 03/10/2024 FAD/002224/2024 14.51
51 Malda Division 000118BILL/00659/2024-202 BILL/00659/2024-2025 01/10/2024 M/S ROY CONSTRUCTION Construction of Boundary Wall at Talsur Water Supply Scheme under Harishchandrapur-II Block under Malda Division, PHE Dte. in the district of Malda. 000118ORD/000173/2024-202 ORD/000173/2024-2025 2948/MD 10/06/2024 3.78 Source Augmentation of Talsur Piped Water Supply Scheme under Malda Division, PHE Dte. (SM/15065) 3.78 5298/MD 01/10/2024 FAD/002224/2024 03/10/2024 FAD/002224/2024 3.78
52 Malda Division 000118BILL/00660/2024-202 BILL/00660/2024-2025 03/10/2024 RAJENDRA PRASAD SINGH Hiring of inspection Vehicle (Non-Air Condition, Bharat Stage-III on or after 01/05/2008 with Diesel/LPG/CNG Engine) in perfect good condition of performing a very long journey and should be covered anywhere without any trouble on monthly hire basis for O 000118ORD/000993/2023-202 ORD/000993/2023-2024 843/MD 22/02/2024 0.4 Providing Functional Household Tap Connection (FHTC) in connection with Jal Jeevan Mission (JJM and JAL SWAPNA) under command area of different Water Supply Schemes at different Blocks under Malda Division, PHE Dte (SM/07973) 0.4 5325/MD 03/10/2024 FAD/002224/2024 03/10/2024 FAD/002224/2024 0.4
53 Malda Division 000118BILL/00661/2024-202 BILL/00661/2024-2025 03/10/2024 RAJENDRA PRASAD SINGH Hiring of inspection Vehicle (Non-Air Condition, Bharat Stage-III on or after 01/05/2008 with Diesel/LPG/CNG Engine) in perfect good condition of performing a very long journey and should be covered anywhere without any trouble on monthly hire basis for O 000118ORD/000993/2023-202 ORD/000993/2023-2024 843/MD 22/02/2024 0.4 Providing Functional Household Tap Connection (FHTC) in connection with Jal Jeevan Mission (JJM and JAL SWAPNA) under command area of different Water Supply Schemes at different Blocks under Malda Division, PHE Dte (SM/07973) 0.4 5325/MD 03/10/2024 FAD/002224/2024 03/10/2024 FAD/002224/2024 0.4
54 Malda Division 000118BILL/00662/2024-202 BILL/00662/2024-2025 03/10/2024 RAJENDRA PRASAD SINGH Hiring of inspection Vehicle (Non-Air Condition, Bharat Stage-III on or after 01/05/2008 with Diesel/LPG/CNG Engine) in perfect good condition of performing a very long journey and should be covered anywhere without any trouble on monthly hire basis for O 000118ORD/000993/2023-202 ORD/000993/2023-2024 843/MD 22/02/2024 0.4 Providing Functional Household Tap Connection (FHTC) in connection with Jal Jeevan Mission (JJM and JAL SWAPNA) under command area of different Water Supply Schemes at different Blocks under Malda Division, PHE Dte (SM/07973) 0.4 5325/MD 03/10/2024 FAD/002224/2024 03/10/2024 FAD/002224/2024 0.4
55 Malda Division 000118BILL/00663/2024-202 BILL/00663/2024-2025 03/10/2024 REAN WATER TECH PRIVATE LIMITE Formal work order for the work of Construction of Overhead Reservoir on pile or raft foundation based on soil test report, laying of Distribution system, FHTC including pump house, boundary wall, internal road with RCC Culvert, internal pipe connection of 000118ORD/000380/2023-202 ORD/000380/2023-2024 3155/MD 16/08/2023 251.01 SURFACE WATER BASED PIPED WATER SUPPLY SCHEME FOR CHANCHAL-II, RATUA-I & RATUA-II BLOCK OF MALDA DISTRICT (SM/18686) 230 5325/MD 03/10/2024 FAD/002224/2024 03/10/2024 FAD/002224/2024 230
56 Malda Division 000118BILL/00664/2024-202 BILL/00664/2024-2025 03/10/2024 DEBAPRIYA SAHA Formal work order for the work of Installation of Stand-Alone Community Purification Plant (CWPP) for Schools at Pirganj, Paranpur and Araidanga GP of Ratua-II Dev. Block under Malda Division, PHE Dte. 000118ORD/000464/2022-202 ORD/000464/2022-2023 39/MD 16/01/2023 14.1 Installation of Stand-Alone Community Purification Plant (71 nos.) at Schools of Ratua-II Dev. Block, Malda under Malda Division, PHE Dte. (SM/10382) 12 5325/MD 03/10/2024 FAD/002224/2024 03/10/2024 FAD/002224/2024 12
Total 1,523.87 # 1,449.26 # 1,436.06