1 |
Hooghly Division |
000075BILL/00941/2024-202 |
BILL/00941/2024-2025 |
30/09/2024 |
AYUSH ENTERPRISE |
Construction of 2 Nos. 3.6 m X 3.0 m Switch Room with Additional Plinth
Height, with Sanitary and Water Supply arrangement,Laying of C.I/D.I pipes
& specials for connection of Proposed 2 nos.T.W with distribution system,
FHTC of SHIBRAI W/S Scheme unde |
000075ORD/000158/2023-202 |
ORD/000158/2023-2024 |
1601/HUG |
01/06/2023 |
9.09 |
SOURCE AUGMENTATION OF GROUND WATER BASED PIPED WATER SUPPLY SCHEME FOR SHIBRAI W/S SCHEME UNDER PANDUA BLOCK (SM/15801) |
9.09 |
3401/Hug |
30/09/2024 |
FAD/002216/2024 |
03/10/2024 |
FAD/002216/2024 |
9.09 |