1 |
Barasat Division |
000009BILL/00157/2022-202 |
BILL/00157/2022-2023 |
16/12/2022 |
LAB. SOLUTION |
Providing service by assigning Resource Person for a period of 3 months supervision of process of preparation for NABL recognition for Chemical Testing of potable water of Sub-District level Water Quality Testing Laboratory including supply, installation |
000009ORD/001060/2021-202 |
ORD/001060/2021-2022 |
675/BST |
24/12/2021 |
1.18 |
Up-gradation of PHED & NGO Managed Laboratories under Water Quality Monitoring & Surveillance Programme for 2018-19 (SM/06349) |
1.18 |
3174/BD |
21/12/2022 |
FAD/001952/2022 |
27/12/2022 |
2457/DPHE-12/14 |
1.18 |
2 |
Barasat Division |
000009BILL/00325/2022-202 |
BILL/00325/2022-2023 |
09/01/2023 |
TRISHA ENTERPRISE & CO. |
Acceptance cum work order for Laying of 90 mm dia. UPVC pipe line from Boltala Kalupara More to near KatakhaliMadrasa within Hingalganj W/S Scheme (Z-I), Hingalganj block under Hasnasbad Sub-Division, P.H.E.Dte. |
000009ORD/000917/2022-202 |
ORD/000917/2022-2023 |
937/HSD |
07/07/2022 |
3.19 |
Providing Functional Household Tap Connection (FHTC) in connection with Jal Jivan Mission (JJM and Jal Swapna) under command area of Hingalganj Piped Water Supply Scheme (Zone -I), Hingalganj Block (SM/09224) |
3.19 |
71/BD |
10/01/2023 |
FAD/002155/2022 |
13/01/2023 |
2689/DPHE-12/14 |
3.19 |
3 |
Barasat Division |
000009BILL/00335/2022-202 |
BILL/00335/2022-2023 |
10/01/2023 |
YOUTH DEVELOPMENT CENTER |
HONORARIUM FOR LABORATORY PERSONNEL |
000009 |
|
PHE/1901/0 |
12/08/2015 |
0.39 |
Yearly operational charges of PHE Dte and NGO managed Laboratories related to WQMSP in connection with Jal Jeevan Mission under Barasat Division PHE Dte. (SM/11625) |
0.39 |
81/BD |
10/01/2023 |
FAD/002155/2022 |
13/01/2023 |
2689/DPHE-12/14 |
0.39 |
4 |
Barasat Division |
000009BILL/00493/2022-202 |
BILL/00493/2022-2023 |
17/02/2023 |
PURBA SERVICES |
Supply, erection of Sign Board at 10 (Ten) Nos. NABL Recognized Sub District Water Testing Laboratory under Barasat Division, P.H.Engg. Dte. |
000009ORD/000986/2022-202 |
ORD/000986/2022-2023 |
879/BST |
27/12/2022 |
0.84 |
Yearly operational charges of PHE Dte and NGO managed Laboratories related to WQMSP in connection with Jal Jeevan Mission under Barasat Division PHE Dte. (SM/11625) |
0.84 |
501/BD |
17/02/2023 |
FAD/002495/2022 |
22/02/2023 |
3110/DPHE-12/14 |
0.84 |
5 |
Barasat Division |
000009BILL/00726/2024-202 |
BILL/00726/2024-2025 |
03/09/2024 |
M/S GHOSH CONSTRUCTION. |
Acceptance cum work order for Construction of RCC culvert, cut-off wall, approach road and other allied works at Over Head Reservoir site (HW site) for Kusangra w/s scheme, Minakhan block under Hasnabad Sub-Division P.H.E. Dte. |
000009ORD/001811/2023-202 |
ORD/001811/2023-2024 |
676/BD |
01/03/2024 |
7.78 |
Kusangra Piped Water Supply Scheme (SM/15832) |
7.78 |
2527/BD |
03/09/2024 |
FAD/001723/2024 |
04/09/2024 |
FAD/001723/2024 |
7.78 |
6 |
Barasat Division |
000009BILL/00734/2024-202 |
BILL/00734/2024-2025 |
03/09/2024 |
UNIVERSAL CONSTRUCTION |
Formal work order for construction of 1150 cum capacity 20 mtr. staging height R.C.C. Over Head Water Reservoir as per Departmental design, drawing and specification including bored pile & pile cap at (Zone-XXVII) i.e. Sutia & Construction of Office cum G |
000009ORD/001261/2023-202 |
ORD/001261/2023-2024 |
4192/BD |
30/10/2023 |
111.05 |
Surface Water Based Water Supply Scheme for Arsenic Affected Areas of Habra-Gaighata & Adjoining Mouzas (SM/04457) |
111.05 |
2537/BD |
03/09/2024 |
FAD/001723/2024 |
04/09/2024 |
FAD/001723/2024 |
111.05 |
7 |
Barasat Division |
000009BILL/00735/2024-202 |
BILL/00735/2024-2025 |
03/09/2024 |
UNIVERSAL CONSTRUCTION |
Formal work order for Construction and Commissioning of 15 (fifteen) nos. Over Head Reservoirs including soil test of different capacity at different PWSS within Bongaon and Bagdah Block along with other ancillary civil works for Arsenic affected Blocks o |
000009ORD/001258/2023-202 |
ORD/001258/2023-2024 |
4188/BD |
30/10/2023 |
99.71 |
Surface Water Based PWSS for Arsenic Affected Areas of Bagda and Bongaon Blocks (Including Ranaghat-I, Ranaghat-II Blocks and Bongaon Municipality) (SM/06364) |
99.71 |
2537/BD |
03/09/2024 |
FAD/001723/2024 |
04/09/2024 |
FAD/001723/2024 |
99.71 |
8 |
Barasat Division |
000009BILL/00745/2024-202 |
BILL/00745/2024-2025 |
04/09/2024 |
A.D.ENTERPRISE. |
Acceptance cum work order for Renovation and repairing of Boundary wall at Head Work site for Augmentation of Sindrani (Zone-II) Water Supply Scheme, Bagdah Block within the jurisdiction of Bongaon Sub-Division under Barasat Division, P.H.E. Dte. |
000009ORD/001728/2023-202 |
ORD/001728/2023-2024 |
522/BD |
20/02/2024 |
16.86 |
Augmentation of ground water based piped water supply scheme for Sindrani (Zone-II) to accommodate FHTC, Block - Bagdah (SM/10786) |
16.86 |
2551/BD |
04/09/2024 |
FAD/001746/2024 |
05/09/2024 |
FAD/001746/2024 |
16.86 |
9 |
Barasat Division |
000009BILL/00855/2024-202 |
BILL/00855/2024-2025 |
12/09/2024 |
EXECUTIVE ENGINEER (HPIU), WBS |
Road Restoration work |
000009 |
|
341/EE/WBS |
02/09/2024 |
27.65 |
Augmentation of ground water based piped water supply scheme for Arsula to accommodate FHTC (SM/11700) |
27.65 |
2653/BD |
12/09/2024 |
FAD/001885/2024 |
13/09/2024 |
FAD/001885/2024 |
27.65 |
10 |
Barasat Division |
000009BILL/00857/2024-202 |
BILL/00857/2024-2025 |
12/09/2024 |
EXECUTIVE ENGINEER-II, P.W.D,B |
Road Restoration work |
000009 |
|
1238/BHTSD |
09/08/2024 |
76.63 |
Augmentation of ground water based piped water supply scheme for Dakshin Chatra Zone-I to accommodate FHTC (SM/12568) |
38.31 |
2653/BD |
12/09/2024 |
FAD/001885/2024 |
13/09/2024 |
FAD/001885/2024 |
38.31 |
11 |
Barasat Division |
000009BILL/00888/2024-202 |
BILL/00888/2024-2025 |
13/09/2024 |
ANKUSH CONSTRUCTION & CO. |
Acceptance cum work order for 2 no. pump connection at PH No.-1 & 2 in connection with Augmentation for
Mohanpur water supply scheme (Z-I), Minakhan block under Hasnabad Sub-Division, P.H.E. Dte. |
000009ORD/000300/2024-202 |
ORD/000300/2024-2025 |
868/HSD |
07/08/2024 |
1.05 |
Augmentation of ground water based piped water supply scheme for Mohanpur (SM/14151) |
1.05 |
2668/BD |
13/09/2024 |
FAD/001909/2024 |
17/09/2024 |
FAD/001909/2024 |
1.05 |
12 |
Barasat Division |
000009BILL/00891/2024-202 |
BILL/00891/2024-2025 |
13/09/2024 |
SRI KRISHNA CO-OP-LABOUR CONTR |
Formal work order for construction of 250 Cum capacity 20 mtr staging height RCC Over Head Reservoir as per departmental design ,drawing and specification including bored pile and pile cap Construction of MS Manifold of 1000 mm dia.10 mm thickness for imp |
000009ORD/001187/2023-202 |
ORD/001187/2023-2024 |
3059/BD |
09/10/2023 |
60.45 |
Surface Water Based Piped Water Supply Scheme for Hasnabad (SM/06472) |
60.45 |
2668/BD |
13/09/2024 |
FAD/001909/2024 |
17/09/2024 |
FAD/001909/2024 |
60.45 |
13 |
Barasat Division |
000009BILL/00901/2024-202 |
BILL/00901/2024-2025 |
18/09/2024 |
IONET |
Procurement of computers and peripherals for the office use in the Barasat Division and Sub-sequent sub division offices under Barasat Division P.H.E.Dte |
000009 |
|
GEMC-51168 |
26/07/2024 |
0.87 |
Procurement of computer and peripherals for the office use in Barasat Division and subsequent Sub-Division offices under Barasat Division, P.H.E.Dte. (SM/13735) |
0.87 |
2685/BD |
18/09/2024 |
FAD/001935/2024 |
19/09/2024 |
FAD/001935/2024 |
0.87 |
14 |
Barasat Division |
000009BILL/00931/2024-202 |
BILL/00931/2024-2025 |
18/09/2024 |
GOPAL SINGHA. |
Continuation Work Order for Hiring of 1(one) number vehicle of Category Motor Cab/Maruti Omni(standard)(Non Air-Conditioned)/LPG/CNG Engine including Driver for performing the inspection works and official duties for the office of the Assistant Engineer, |
000009ORD/002038/2023-202 |
ORD/002038/2023-2024 |
107/BKP |
06/03/2024 |
0.35 |
Providing Functional Household Tap Connection (FHTC) in connection with Jal Jivan Mission (JJM and Jal Swapna) under command area of Dangatangatangi, Bodai, Sonadanga, Kamdebpur, Mirhati, Mathura, Durlavpur & Belu mouzas within Bodai Zone-I Piped Water Su (SM/08773) |
0.35 |
2685/BD |
18/09/2024 |
FAD/001935/2024 |
19/09/2024 |
FAD/001935/2024 |
0.35 |
15 |
Barasat Division |
000009BILL/01126/2024-202 |
BILL/01126/2024-2025 |
25/09/2024 |
SUJIT KUMAR SAHA |
Formal work order for Laying of DI/UPVC distribution pipe line and providing Functional Household Tap Connection for Augmentation of Gokna Zone-I A water supply scheme in Baduria Block under Barasat Division, P.H.E Dte. |
000009ORD/000172/2023-202 |
ORD/000172/2023-2024 |
1726/BD |
08/06/2023 |
76.07 |
Augmentation of ground water based piped water supply scheme for Gokna to accommodate FHTC (SM/13405) |
76.07 |
2788/BD |
25/09/2024 |
FAD/002078/2024 |
26/09/2024 |
FAD/002078/2024 |
76.07 |
16 |
Barasat Division |
000009BILL/01186/2024-202 |
BILL/01186/2024-2025 |
27/09/2024 |
MONDAL & CO. (BASIRHAT). |
Formal work order for Construction of 500 cum capacity 20 mtr staging height R.C.C Over Head Reservoir as per Deptt. design, drawing & specification including bored pile with pile cap in connection with Augmentation of Chandpur water supply scheme (Zone-I |
000009ORD/001096/2023-202 |
ORD/001096/2023-2024 |
2866/BD |
20/09/2023 |
96.86 |
Augmentation of Ground Water Based Piped Water Supply Scheme for Chandpur to accommodate FHTC. (SM/13313) |
96.86 |
2831/BD |
27/09/2024 |
FAD/002142/2024 |
30/09/2024 |
FAD/002142/2024 |
96.86 |
17 |
Barasat Division |
000009BILL/01206/2024-202 |
BILL/01206/2024-2025 |
27/09/2024 |
H.I.ENTERPRISE. |
Formal work order for Withdrawing and relaying of existing D.I. Rising main and restoration of damaged UPVC pipe line of distribution system along the PW(R)D, PWD, ZP, PMGSY & other Black Top and WBM Road due to laying of different dia. Secondary Rising M |
000009ORD/001769/2023-202 |
ORD/001769/2023-2024 |
574/BD |
22/02/2024 |
36.54 |
Surface Water Based PWSS for Arsenic Affected Areas of Bagda and Bongaon Blocks (Including Ranaghat-I, Ranaghat-II Blocks and Bongaon Municipality) (SM/06364) |
36.54 |
2831/BD |
27/09/2024 |
FAD/002142/2024 |
30/09/2024 |
FAD/002142/2024 |
36.54 |
18 |
Barasat Division |
000009BILL/01225/2024-202 |
BILL/01225/2024-2025 |
27/09/2024 |
ATINDRA CONSTRUCTION PRIVATE L |
Formal work order for Laying of HDPE pipe of different diameter by Horizontal Directional Drilling (HDD) method for crossing canal, river along busy road etc. different places along the stretches for (North-East Part) of Secondary Rising Main to connect a |
000009ORD/001930/2023-202 |
ORD/001930/2023-2024 |
806/BD |
12/03/2024 |
167.54 |
Surface Water Based PWSS for Arsenic Affected Areas of Bagda and Bongaon Blocks (Including Ranaghat-I, Ranaghat-II Blocks and Bongaon Municipality) (SM/06364) |
167.54 |
2838/BD |
27/09/2024 |
FAD/002142/2024 |
30/09/2024 |
FAD/002142/2024 |
167.54 |
19 |
Barasat Division |
000009BILL/01273/2024-202 |
BILL/01273/2024-2025 |
01/10/2024 |
POWER TOOLS & ENGINEERING |
Formal work order for Laying of DI rising main, DI/UPVC distribution pipe line, Providing Functional Household Tap Connection, Protection works for different dia. UPVC/DI distribution pipeline by UC bullah/Bamboo pile at different places, Construction of |
000009ORD/000140/2023-202 |
ORD/000140/2023-2024 |
1714/BD |
08/06/2023 |
55.19 |
Hatbhanga Piped Water Supply Scheme (SM/13525) |
55.19 |
2887/BD |
01/10/2024 |
FAD/002204/2024 |
03/10/2024 |
FAD/002204/2024 |
55.19 |
20 |
Barasat Division |
000009BILL/01371/2024-202 |
BILL/01371/2024-2025 |
14/11/2024 |
SELIM GAZI. |
Eucalyptus Bullah Piling for Emergency protection Work of Pipe line at Ramnarayanpur Mouza between Node Number 27 & 28 of Gobindapur Dhokra Water Supply Scheme under Basirhat Sub Division under Barasat Division P.H.E. Dte.
(Length of Piling Work = 24) |
000009ORD/000091/2024-202 |
ORD/000091/2024-2025 |
940/BHTSD |
24/05/2024 |
0.73 |
Augmentation of ground water based piped water supply scheme for Gobindapur Dhokra to accommodate FHTC (SM/11532) |
0.73 |
3347/BD |
29/11/2024 |
FAD/003126/2024 |
26/03/2025 |
FAD/003126/2024 |
0.73 |
21 |
Barasat Division |
000009BILL/01484/2024-202 |
BILL/01484/2024-2025 |
11/12/2024 |
M/S K.P.PAL. |
Acceptance cum work order for Sinking of 1 no. 300mm. X 200mm.dia. 190.00mtr. deep tube well by direct rotary rig method, having 300mm.dia. 42.0mtr. long PVC housing pipe & 200mm.dia. 30.0mtr. long filter for Augmentation of Berachampa Zone-I Water Supply |
000009ORD/000281/2024-202 |
ORD/000281/2024-2025 |
2192/BD |
05/08/2024 |
12.65 |
Augmentation of Berachampa Zone-1 Piped Water Supply Scheme (SM/14490) |
12.65 |
3511/BD |
11/12/2024 |
FAD/003126/2024 |
26/03/2025 |
FAD/003126/2024 |
12.65 |
22 |
Barasat Division |
000009BILL/01501/2024-202 |
BILL/01501/2024-2025 |
16/12/2024 |
RANA ENTERPRISE |
Different works in connection with Augmentation Shibalaya PWSS (1st Tubewell site - Pump House). |
000009ORD/000460/2024-202 |
ORD/000460/2024-2025 |
579/BSD |
10/09/2024 |
1.69 |
Augmentation of Ground Water Based Piped Water Supply Scheme for SHIBALAYA to accommodate FHTC. (SM/13472) |
1.69 |
3552/BD |
16/12/2024 |
FAD/003126/2024 |
26/03/2025 |
FAD/003126/2024 |
1.69 |
23 |
Barasat Division |
000009BILL/01502/2024-202 |
BILL/01502/2024-2025 |
16/12/2024 |
MONDAL PRECISION PVT.LTD |
Acceptance cum work order for Renovation of Arsenic cum Iron Removal Plant at Sadiknagar zone - II W/S Scheme at Basirhat - II Block under Basirhat Sub Division, PHE Dte. Capacity - 56.25 Cum/hr. |
000009ORD/002025/2023-202 |
ORD/002025/2023-2024 |
919/BD |
15/03/2024 |
29.39 |
Augmentation of ground water based piped water supply scheme for Sadiknagar (Zone-II) to accommodate FHTC (SM/11523) |
29.39 |
3552/BD |
16/12/2024 |
FAD/003173/2024 |
28/03/2025 |
FAD/003173/2024 |
29.39 |
24 |
Barasat Division |
000009BILL/01512/2024-202 |
BILL/01512/2024-2025 |
17/12/2024 |
VAI ENTERPRISE. |
Acceptance cum work order for Renovation & repairing of Boundary wall at Head work site for Augmentation of Chikanpara water Supply scheme, Gaighata Block within jurisdiction of Bongaon Sub-Division, P.H.E. Dte. |
000009ORD/001480/2023-202 |
ORD/001480/2023-2024 |
4413/BD |
10/11/2023 |
10.76 |
Augmentation of Ground water based piped water supply scheme for Chikanpara to accommodate FHTC (SM/10690) |
10.76 |
3564/BD |
17/12/2024 |
FAD/003126/2024 |
26/03/2025 |
FAD/003126/2024 |
10.76 |
25 |
Barasat Division |
000009BILL/01531/2024-202 |
BILL/01531/2024-2025 |
26/12/2024 |
DEL DELTA CONSTRUCTION |
Acceptance cum work order for Construction of Boundary wall at Head Work site for Augmentation of Kola Water Supply Scheme, Bagdah Block within the jurisdiction of Bongaon Sub-Division under Barasat Division, P.H.E. Dte. |
000009ORD/001758/2023-202 |
ORD/001758/2023-2024 |
524/BD |
20/02/2024 |
10.71 |
Augmentation of ground water based piped water supply scheme for Kola to accommodate FHTC (SM/11538) |
10.71 |
3700/BD |
26/12/2024 |
FAD/003126/2024 |
26/03/2025 |
FAD/003126/2024 |
10.71 |
26 |
Barasat Division |
000009BILL/01549/2024-202 |
BILL/01549/2024-2025 |
30/12/2024 |
EXECUTIVE ENGINEER (HPIU), WBS |
Restoration works on Black top surface and hard shoulder damaged due to laying pipeline along Bithari Football Ground to Mallikpur block-Swarunagar under JJM programme in favour of North 24 Parganas Division PHE Dte . |
000009 |
|
443/N-24P/ |
19/11/2024 |
13.17 |
Augmentation of ground water based piped water supply scheme for Nityananda Kati Balti to accommodate FHTC (SM/11974) |
13.17 |
3776/BD |
30/12/2024 |
FAD/003026/2024 |
13/03/2025 |
FAD/003026/2024 |
13.17 |
27 |
Barasat Division |
000009BILL/01551/2024-202 |
BILL/01551/2024-2025 |
31/12/2024 |
SANTU GHOSH. |
Different works in connection with Augmentation Bamangachi PWSS (1st Tubewell - Pump House, Boundary Wall & Service Road). |
000009ORD/000427/2024-202 |
ORD/000427/2024-2025 |
559/BSD |
09/09/2024 |
3.6 |
Augmentation of Ground water based Bamangachi PWSS to accommodate FHTC (SM/13468) |
3.6 |
4/BD |
02/01/2025 |
FAD/003126/2024 |
26/03/2025 |
FAD/003126/2024 |
3.6 |
28 |
Barasat Division |
000009BILL/01552/2024-202 |
BILL/01552/2024-2025 |
02/01/2025 |
JOY ENTERPRISE |
Construction of Service Road 50 Mtr. Length and 2 Mtr. Width for Pump House No1 of Sadpur Water Supply Scheme in connection with Augmentation work under JJM project within the jurisdiction of Habra Sub-Division under Barasat Division, PHE Dte. |
000009ORD/000600/2024-202 |
ORD/000600/2024-2025 |
783/HAB |
20/08/2024 |
2.92 |
Augmentation of Ground water based piped water supply scheme for Sadpur to accommodate (SM/10577) |
2.92 |
4/BD |
02/01/2025 |
FAD/003126/2024 |
26/03/2025 |
FAD/003126/2024 |
2.92 |
29 |
Barasat Division |
000009BILL/01553/2024-202 |
BILL/01553/2024-2025 |
02/01/2025 |
JOY ENTERPRISE |
Special repair & renovation of pump house and other allied Works for Pump House No - 1 of Sadpur W/S scheme in connection with Augmentation work under JJM project within the jurisdiction of Habra Sub-Division under Barasat Division, P.H.E. Dte. |
000009ORD/001888/2023-202 |
ORD/001888/2023-2024 |
136/HAB |
05/02/2024 |
0.44 |
Augmentation of Ground water based piped water supply scheme for Sadpur to accommodate (SM/10577) |
0.44 |
4/BD |
02/01/2025 |
FAD/003126/2024 |
26/03/2025 |
FAD/003126/2024 |
0.44 |
30 |
Barasat Division |
000009BILL/01566/2024-202 |
BILL/01566/2024-2025 |
06/01/2025 |
JEET ENTERPRISE. |
Acceptance cum work order for Repairing and renovation of Compressor Room for AIRP, Construction of Approach Road at 2nd Tube Well site and Construction of Boundary wall and Approach Road at Head Work and 2nd T/W site under Augmentation of Hariharpur Wate |
000009ORD/001781/2023-202 |
ORD/001781/2023-2024 |
625/BD |
28/02/2024 |
7.66 |
Augmentation of ground water based piped water supply scheme for Hariharpur to accommodate FHTC (SM/11601) |
7.66 |
42/BD |
06/01/2025 |
FAD/003126/2024 |
26/03/2025 |
FAD/003126/2024 |
7.66 |
31 |
Barasat Division |
000009BILL/01567/2024-202 |
BILL/01567/2024-2025 |
06/01/2025 |
M/S SAYAN ENTERPRISE. |
Construction of Approach Road at 2nd Pump House site for Augmentation of Gangrapota Water Supply Scheme within the jurisdiction of Bongaon Sub-Division under Barasat Division, P.H.E. Dte. |
000009ORD/000967/2023-202 |
ORD/000967/2023-2024 |
555/Bon |
18/07/2023 |
0.79 |
Augmentation of Ground water based piped water supply scheme for Gangrapota to Accommodate FHTC (SM/10309) |
0.79 |
42/BD |
06/01/2025 |
FAD/003126/2024 |
26/03/2025 |
FAD/003126/2024 |
0.79 |
32 |
Barasat Division |
000009BILL/01581/2024-202 |
BILL/01581/2024-2025 |
06/01/2025 |
A.D.ENTERPRISE. |
Acceptance cum work order for Construction of Boundary wall at Head Work site for Augmentation of Hariharpur Water Supply Scheme, Bagdah Block within the jurisdiction of Bongaon Sub-Division under Barasat Division, P.H.E. Dte. |
000009ORD/001791/2023-202 |
ORD/001791/2023-2024 |
648/BD |
29/02/2024 |
13.34 |
Augmentation of ground water based piped water supply scheme for Hariharpur to accommodate FHTC (SM/11601) |
13.34 |
42/BD |
06/01/2025 |
FAD/003126/2024 |
26/03/2025 |
FAD/003126/2024 |
13.34 |
33 |
Barasat Division |
000009BILL/01585/2024-202 |
BILL/01585/2024-2025 |
13/01/2025 |
MONDAL & CO.(BON) |
Construction of 3.60 mtr. X 3.00mtr. size Switch room with sanitary and water supply arrangement incl. plinth protection at 2nd Tube Well site at Kamlabas w/s scheme Bagdah block within the jurisdiction of Bongaon Sub-Division, under Barasat Division, P.H |
000009ORD/002274/2023-202 |
ORD/002274/2023-2024 |
211/Bon |
27/02/2024 |
4.39 |
Augmentation of ground water based piped water supply scheme for Kamlabas to accommodate FHTC (SM/11602) |
4.39 |
135/BD |
13/01/2025 |
FAD/003126/2024 |
26/03/2025 |
FAD/003126/2024 |
4.39 |
34 |
Barasat Division |
000009BILL/01586/2024-202 |
BILL/01586/2024-2025 |
13/01/2025 |
TRISHA ENTERPRISE & CO. |
Acceptance cum work order for Temporary approach road for movement of winch machine and other allied machineries at Head Work site within Kanmari W/S scheme (Z-I), Sandeshkhali-I block under Hasnabad Sub-Division P.H.E. Dte. |
000009ORD/000573/2024-202 |
ORD/000573/2024-2025 |
1117/HSD |
19/09/2024 |
0.9 |
Providing Functional Household Tap Connection (FHTC) in connection under command area of Kanmari (Zone-II) W/S Scheme, Sandeshkhali-I Block, Dist. - North 24 Parganas under Barasat Division, PHE. Dte. (Phase I). (SM/10557) |
0.9 |
135/BD |
13/01/2025 |
FAD/003126/2024 |
26/03/2025 |
FAD/003126/2024 |
0.9 |
35 |
Barasat Division |
000009BILL/01589/2024-202 |
BILL/01589/2024-2025 |
13/01/2025 |
BARNALI DUTTA |
Acceptance cum work order for Land development at Over Head Reservoir site for Augmentation of Murarisha water supply scheme, Hasnabad Block under Hasnabad Sub-Division, PHE Dte. under Barasat Division, PHE Dte. |
000009ORD/000176/2024-202 |
ORD/000176/2024-2025 |
2457/BD |
27/08/2024 |
5.31 |
Augmentation of Ground water based piped water supply scheme for Murarisha to accommodate FHTC (SM/10555) |
5.31 |
135/BD |
13/01/2025 |
FAD/003126/2024 |
26/03/2025 |
FAD/003126/2024 |
5.31 |
36 |
Barasat Division |
000009BILL/01592/2024-202 |
BILL/01592/2024-2025 |
13/01/2025 |
M/S SUKANTA ENTERPRISE. |
Acceptance cum work order for Repairing of Boundary wall and Construction of Approach Road at Head Work site, 2nd Pump House Site & 3rd Pump House Site under Augmentation of Shimulpur Water Supply Scheme, Gaighata Block within the jurisdiction of Bongaon |
000009ORD/001747/2023-202 |
ORD/001747/2023-2024 |
564/BD |
22/02/2024 |
12.7 |
Augmentation of Ground Water Based Piped Water Supply Scheme for Shimulpur to accommodate FHTC (SM/11598) |
12.7 |
135/BD |
13/01/2025 |
FAD/003126/2024 |
26/03/2025 |
FAD/003126/2024 |
12.7 |
37 |
Barasat Division |
000009BILL/01673/2024-202 |
BILL/01673/2024-2025 |
06/02/2025 |
JOY HIND TUBEWELLS. |
Acceptance cum work order for Sinking of 1(one) no. 300mm x 200 mm. dia. Replacement of Tube well 250 mtr deep by D.R. method with UPVC pipe & UPVC ribbed strainer for Augmentation of Chikanpara water supply scheme at Head Work Site under Bongaon Sub-Divi |
000009ORD/001167/2023-202 |
ORD/001167/2023-2024 |
2686/BD |
04/09/2023 |
13.56 |
Augmentation of Ground water based piped water supply scheme for Chikanpara to accommodate FHTC (SM/10690) |
13.56 |
418/BD |
06/02/2025 |
FAD/003126/2024 |
26/03/2025 |
FAD/003126/2024 |
13.56 |
38 |
Barasat Division |
000009BILL/01675/2024-202 |
BILL/01675/2024-2025 |
06/02/2025 |
SAMBHU RAY CHOWDHURY. |
Repairing and renovation of High Lift Pump House under Augmentation of Chandpara Water Supply Scheme, Gaighata Block within the jurisdiction of Bongaon Sub-Division under Barasat Division, P.H.E. Dte. |
000009ORD/000887/2024-202 |
ORD/000887/2024-2025 |
1395/Bon |
27/11/2024 |
1.64 |
Augmentation of Ground water based piped water supply scheme for Chandpara to accommodate FHTC (SM/10587) |
1.64 |
418/BD |
06/02/2025 |
FAD/003126/2024 |
26/03/2025 |
FAD/003126/2024 |
1.64 |
39 |
Barasat Division |
000009BILL/01676/2024-202 |
BILL/01676/2024-2025 |
06/02/2025 |
B. S. ENTERPRISE (BANAMALIPUR) |
Different works in connection with Augmentation Shibalaya PWSS (2nd Tubewell site - Boundary Wall & Service Road).
|
000009ORD/000461/2024-202 |
ORD/000461/2024-2025 |
580/BSD |
10/09/2024 |
1.41 |
Augmentation of Ground Water Based Piped Water Supply Scheme for SHIBALAYA to accommodate FHTC. (SM/13472) |
1.41 |
418/BD |
06/02/2025 |
FAD/003126/2024 |
26/03/2025 |
FAD/003126/2024 |
1.41 |
40 |
Barasat Division |
000009BILL/01677/2024-202 |
BILL/01677/2024-2025 |
06/02/2025 |
JOY HIND TUBEWELLS. |
Acceptance cum work order for Sinking of 1(one) no. 300mm x 200 mm. dia. Replacement of Tube well 250 mtr deep by D.R. method with UPVC pipe & UPVC ribbed strainer for Augmentation of Chikanpara water supply scheme at 2nd T/W Site under Bongaon Sub-Divisi |
000009ORD/001168/2023-202 |
ORD/001168/2023-2024 |
2690/BD |
04/09/2023 |
14.26 |
Augmentation of Ground water based piped water supply scheme for Chikanpara to accommodate FHTC (SM/10690) |
14.26 |
418/BD |
06/02/2025 |
FAD/003126/2024 |
26/03/2025 |
FAD/003126/2024 |
14.26 |
41 |
Barasat Division |
000009BILL/01689/2024-202 |
BILL/01689/2024-2025 |
10/02/2025 |
NADIA TUBEWELLS |
Acceptance cum work order for Sinking of 1 (one) no. new 300 mm. x 200 mm. dia. 300 mtr deep Tubewell by D.R. Rig method with UPVC pipe & UPVC ribbed strainer for Purana Bongaon Piped Water Supply Scheme at H/W Site under Bongaon Sub-Division, P.H.E. Dte. |
000009ORD/001017/2023-202 |
ORD/001017/2023-2024 |
2834/BD |
15/09/2023 |
16.45 |
Purana Bongaon Piped water supply scheme (SM/13896) |
16.45 |
441/BD |
10/02/2025 |
FAD/003126/2024 |
26/03/2025 |
FAD/003126/2024 |
16.45 |
42 |
Barasat Division |
000009BILL/01711/2024-202 |
BILL/01711/2024-2025 |
19/02/2025 |
UPWARDS ENGINEERING PRIVATE LI |
Additional laying of UPVC pipe to connect every house hold connection with Augmentation work at Ichhapur W/S Scheme under Gaighata block within the jurisdiction of Bongaon Sub-Division, under Barasat Division, P.H.E. Dte. (Part-A) |
000009ORD/000641/2024-202 |
ORD/000641/2024-2025 |
1322/Bon |
12/11/2024 |
4.96 |
Augmentation of Ground water based piped water supply scheme for Ichhapur to accommodate FHTC (SM/10565) |
4.96 |
544/BD |
19/02/2025 |
FAD/003126/2024 |
26/03/2025 |
FAD/003126/2024 |
4.96 |
43 |
Barasat Division |
000009BILL/01796/2024-202 |
BILL/01796/2024-2025 |
24/02/2025 |
AREOCON. |
Special repair and renovation of boundary wall and other allied Works for Pump House No - 1 of Bergum WS scheme in connection with Augmentation work under JJM project within the jurisdiction of Habra Sub-Division under Barasat Division, P.H.E. Dte. |
000009ORD/000597/2024-202 |
ORD/000597/2024-2025 |
913/HAB |
30/10/2024 |
1.86 |
Augmentation of Ground water based piped water supply scheme for Bergum to accommodate FHTC (SM/10514) |
1.86 |
598/BD |
24/02/2025 |
FAD/003126/2024 |
26/03/2025 |
FAD/003126/2024 |
1.86 |
44 |
Barasat Division |
000009BILL/01799/2024-202 |
BILL/01799/2024-2025 |
27/02/2025 |
ROHAN MONDAL. |
Supply of Sluice valve (200 mm) including construction of Sluice valve chamber for Augmentation of Dakshin Chatra Zone-I Water Supply Scheme under Basirhat Sub Division , P.H.E. Dte. under Barasat Division, P.H.E. Dte. |
000009ORD/000075/2024-202 |
ORD/000075/2024-2025 |
928/BHTSD |
24/05/2024 |
0.97 |
Augmentation of ground water based piped water supply scheme for Dakshin Chatra Zone-I to accommodate FHTC (SM/12568) |
0.97 |
617/BD |
27/02/2025 |
FAD/003126/2024 |
26/03/2025 |
FAD/003126/2024 |
0.97 |
45 |
Barasat Division |
000009BILL/01800/2024-202 |
BILL/01800/2024-2025 |
27/02/2025 |
S.R.M. ENTERPRISE. |
Laying of HDPE pipe line and Repairing of DI pipelines including supply of Sluice valve (200 mm) for interconnection of AIRP under Augmentation work of Dakshin Chatra Zone-I Water Supply Scheme under Basirhat Sub Division , P.H.E. Dte. under Barasat Divis |
000009ORD/000079/2024-202 |
ORD/000079/2024-2025 |
929/BHTSD |
24/05/2024 |
1 |
Augmentation of ground water based piped water supply scheme for Dakshin Chatra Zone-I to accommodate FHTC (SM/12568) |
1 |
617/BD |
27/02/2025 |
FAD/003126/2024 |
26/03/2025 |
FAD/003126/2024 |
1 |
46 |
Barasat Division |
000009BILL/01802/2024-202 |
BILL/01802/2024-2025 |
27/02/2025 |
CHAKRABORTY SUPPLIERS & CONSTR |
Different works in connection with Augmentation Nebadhui Duttapukur Zone-I PWSS (1st Tubewell - Pump House). |
000009ORD/000453/2024-202 |
ORD/000453/2024-2025 |
574/BSD |
10/09/2024 |
1.2 |
Augmentation of Ground water based Nebadhai Duttapukur Zone-I PWSS to Accommodate FHTC. (SM/13471) |
1.2 |
617/BD |
27/02/2025 |
FAD/003126/2024 |
26/03/2025 |
FAD/003126/2024 |
1.2 |
47 |
Barasat Division |
000009BILL/01809/2024-202 |
BILL/01809/2024-2025 |
27/02/2025 |
M/S DAS & CO. |
Acceptance cum work order for for Construction of Pump House with latrine at Bodai Zone-II water Supply Scheme under Amdanga Block size of 5.40m x 3.60m within Barasat Sub Division, P.H.E.Dte. |
000009ORD/002255/2023-202 |
ORD/002255/2023-2024 |
932/BD |
15/03/2024 |
4.9 |
Augmentation of ground water based piped water supply scheme for Bodai Zone-II to accommodate FHTC (SM/14162) |
4.9 |
617/BD |
27/02/2025 |
FAD/003126/2024 |
26/03/2025 |
FAD/003126/2024 |
4.9 |
48 |
Barasat Division |
000009BILL/01811/2024-202 |
BILL/01811/2024-2025 |
27/02/2025 |
SANTU GHOSH. |
Different works in connection with Augmentation Joypul PWSS (2nd Tubewell - Pump House, Boundary Wall & Service Road). |
000009ORD/000451/2024-202 |
ORD/000451/2024-2025 |
573/BSD |
10/09/2024 |
0.98 |
Augmentation of Ground water based Joypul Piped water supply scheme to accommodate FHTC (SM/15324) |
0.98 |
617/BD |
27/02/2025 |
FAD/003126/2024 |
26/03/2025 |
FAD/003126/2024 |
0.98 |
49 |
Barasat Division |
000009BILL/01841/2024-202 |
BILL/01841/2024-2025 |
04/03/2025 |
SRI KRISHNA CO-OP-LABOUR CONTR |
Formal work order for Laying of DI rising main, DI/UPVC distribution pipe line, Providing Functional Household Tap Connection, Protection works for different dia. UPVC/DI distribution pipeline by UC bullah/Bamboo pile at different places, Construction of |
000009ORD/000137/2023-202 |
ORD/000137/2023-2024 |
1703/BD |
08/06/2023 |
6.58 |
Debitala Piped Water Supply Scheme (SM/13523) |
6.58 |
670/BD |
04/03/2025 |
FAD/003126/2024 |
26/03/2025 |
FAD/003126/2024 |
6.58 |
50 |
Barasat Division |
000009BILL/01912/2024-202 |
BILL/01912/2024-2025 |
07/03/2025 |
SAMBHU RAY CHOWDHURY. |
Acceptance cum work order for Improvement of Iron Elimination Plant and other related allied works and Repairing & renovation of Compressor Room for Iron Elimination Plant under Augmentation of Chandpara Water Supply Scheme, Gaighata Block within the juri |
000009ORD/001566/2023-202 |
ORD/001566/2023-2024 |
63/BD |
05/01/2024 |
0.53 |
Augmentation of Ground water based piped water supply scheme for Chandpara to accommodate FHTC (SM/10587) |
0.53 |
728/BD |
07/03/2025 |
FAD/003126/2024 |
26/03/2025 |
FAD/003126/2024 |
0.53 |
51 |
Barasat Division |
000009BILL/01930/2024-202 |
BILL/01930/2024-2025 |
11/03/2025 |
GHOSH CONSTRUCTION. |
Acceptance cum work order for Repairing and renovation works for 225 cum. capacity 20 mtr. staging height R.C.C. Over Head water Reservoir for Augmentation of Kurulia (Zone-I) Water Supply Scheme, Bagdah Block within the jurisdiction of Bongaon Sub-Divis |
000009ORD/000454/2024-202 |
ORD/000454/2024-2025 |
3039/BD |
22/10/2024 |
13.2 |
Augmentation of ground water based piped water supply scheme for Kurulia (Zone-I) to accommodate FHTC, Block - Bagdah (SM/10298) |
13.2 |
756/BD |
11/03/2025 |
FAD/003126/2024 |
26/03/2025 |
FAD/003126/2024 |
13.2 |
52 |
Barasat Division |
000009BILL/01936/2024-202 |
BILL/01936/2024-2025 |
11/03/2025 |
SUN ENTERPRISE. |
Repairing of laying of water distribution pipe line, FHTC work and other ancillary works for Humaipur Water Supply Scheme at Block-Barasat-2 under Barasat Division, P.H.E. Dte. |
000009ORD/000509/2024-202 |
ORD/000509/2024-2025 |
420/BSD |
05/08/2024 |
0.65 |
Improvement of Humaipur Piped Water Supply Scheme (SM/05811) |
0.65 |
756/BD |
11/03/2025 |
FAD/003126/2024 |
26/03/2025 |
FAD/003126/2024 |
0.65 |
53 |
Barasat Division |
000009BILL/01939/2024-202 |
BILL/01939/2024-2025 |
11/03/2025 |
M/S LATIKA CONSTRUCTION. |
Improvement of Iron Elimination Plant including repairing of drain and other allied works of Gaighata W/S Scheme in connection with Augmentation work under JJM project within the jurisdiction of Habra Sub-Division under Barasat Division, P.H.E. Dte. |
000009ORD/000340/2024-202 |
ORD/000340/2024-2025 |
692/HAB |
25/07/2024 |
4.06 |
Augmentation of Ground water based piped water supply scheme for Gaighata to accommodate FHTC (SM/10519) |
4.06 |
756/BD |
11/03/2025 |
FAD/003126/2024 |
26/03/2025 |
FAD/003126/2024 |
4.06 |
54 |
Barasat Division |
000009BILL/01940/2024-202 |
BILL/01940/2024-2025 |
11/03/2025 |
ACHARJEE AND ASSOCIATES |
Surging of 1 (one) no 250 x 150 mm dia tubewell at Humaipur Water Supply Scheme (T/W No.-II) under Barasat Sub Division, P.H.E. Dte. |
000009ORD/001071/2024-202 |
ORD/001071/2024-2025 |
290/BSD |
03/07/2024 |
0.46 |
Improvement of Humaipur Piped Water Supply Scheme (SM/05811) |
0.46 |
756/BD |
11/03/2025 |
FAD/003126/2024 |
26/03/2025 |
FAD/003126/2024 |
0.46 |
55 |
Barasat Division |
000009BILL/01958/2024-202 |
BILL/01958/2024-2025 |
13/03/2025 |
JOY ENTERPRISE |
Acceptance cum work order for Construction of the Boundary wall in Pump House No. 3 of Maslandapur- II Piped Water Supply Scheme in connection with Augmentation work under JJM project within the jurisdiction of Habra Sub-Division under Barasat Division, |
000009ORD/000356/2024-202 |
ORD/000356/2024-2025 |
2409/BD |
22/08/2024 |
6.04 |
Augmentation of Ground water based piped water supply scheme for Maslandapur Zone-II to accommodate (SM/10533) |
6.04 |
795/BD |
13/03/2025 |
FAD/003126/2024 |
26/03/2025 |
FAD/003126/2024 |
6.04 |
56 |
Barasat Division |
000009BILL/01960/2024-202 |
BILL/01960/2024-2025 |
13/03/2025 |
JOY ENTERPRISE |
Construction of Service Road (10 Mtr. Length & 2 Mtr. Width) for Pump House No:3 of Maslandapur II Piped Water Supply Scheme in connection with Augmentation work under JJM project within the jurisdiction of Habra Sub-Division under Barasat Division, PHE |
000009ORD/001887/2023-202 |
ORD/001887/2023-2024 |
135/HAB |
05/02/2024 |
0.6 |
Augmentation of Ground water based piped water supply scheme for Maslandapur Zone-II to accommodate (SM/10533) |
0.6 |
795/BD |
13/03/2025 |
FAD/003126/2024 |
26/03/2025 |
FAD/003126/2024 |
0.6 |
57 |
Barasat Division |
000009BILL/01974/2024-202 |
BILL/01974/2024-2025 |
18/03/2025 |
MADHAB CHANDRA DAS |
Hiring 1(One) No. Diesel Luxury Car on Daily basis. (for 6 (six) months from w.e.f. 01.06.2024) for the office use of the Assistant Engineer, Barasat Sub Division, P.H.E. Dte. @ Rs. 475.00 (Rupees four hundred & seventy five only) per day Excluding fuel. |
000009ORD/000049/2024-202 |
ORD/000049/2024-2025 |
140/BSD |
28/05/2024 |
0.3 |
Augmentation of Ground water based Bodai Zone-I PWSS to accommodate FHTC (SM/18416) |
0.3 |
841/BD |
18/03/2025 |
FAD/003126/2024 |
26/03/2025 |
FAD/003126/2024 |
0.3 |
58 |
Barasat Division |
000009BILL/01975/2024-202 |
BILL/01975/2024-2025 |
18/03/2025 |
MADHAB CHANDRA DAS |
Hiring 1(One) No. Diesel Luxury Car on Daily basis. (for 6 (six) months from w.e.f. 01.06.2024) for the office use of the Assistant Engineer, Barasat Sub Division, P.H.E. Dte. @ Rs. 475.00 (Rupees four hundred & seventy five only) per day Excluding fuel. |
000009ORD/000049/2024-202 |
ORD/000049/2024-2025 |
140/BSD |
28/05/2024 |
0.32 |
Augmentation of Ground water based Bodai Zone-I PWSS to accommodate FHTC (SM/18416) |
0.32 |
841/BD |
18/03/2025 |
FAD/003126/2024 |
26/03/2025 |
FAD/003126/2024 |
0.32 |
59 |
Barasat Division |
000009BILL/01976/2024-202 |
BILL/01976/2024-2025 |
18/03/2025 |
MADHAB CHANDRA DAS |
Continuation work Order for Hiring 1(One) No. Diesel Luxury Car on Daily basis. (for 6 (six) months from w.e.f. 01.12.2022) for the office use of the Assistant Engineer, Barasat Sub Division, P.H.E. Dte. @ Rs. 475.00 (Rupees four hundred & seventy five o |
000009ORD/001021/2024-202 |
ORD/001021/2024-2025 |
827/BSD |
22/11/2024 |
0.35 |
Augmentation of Ground water based Bodai Zone-I PWSS to accommodate FHTC (SM/18416) |
0.35 |
841/BD |
18/03/2025 |
FAD/003126/2024 |
26/03/2025 |
FAD/003126/2024 |
0.35 |
60 |
Barasat Division |
000009BILL/01977/2024-202 |
BILL/01977/2024-2025 |
18/03/2025 |
MADHAB CHANDRA DAS |
Continuation work Order for Hiring 1(One) No. Diesel Luxury Car on Daily basis. (for 6 (six) months from w.e.f. 01.12.2022) for the office use of the Assistant Engineer, Barasat Sub Division, P.H.E. Dte. @ Rs. 475.00 (Rupees four hundred & seventy five o |
000009ORD/001021/2024-202 |
ORD/001021/2024-2025 |
827/BSD |
22/11/2024 |
0.34 |
Augmentation of Ground water based Bodai Zone-I PWSS to accommodate FHTC (SM/18416) |
0.34 |
841/BD |
18/03/2025 |
FAD/003126/2024 |
26/03/2025 |
FAD/003126/2024 |
0.34 |