1 |
Alipore Division |
000008BILL/00716/2024-202 |
BILL/00716/2024-2025 |
06/07/2024 |
CONCORD ENGINEERING |
Augmentation of laying distribution system to extend the benefit of 100% household by proving Functional Household Tap Connection (FHTC) for leftout areas and construction of platform for existing FHTC with allied works in Zone-V of Falta block within M |
000008ORD/001391/2022-202 |
ORD/001391/2022-2023 |
10863/AD |
04/02/2023 |
54.8 |
AUGMENTATION OF LAYING DISTRIBUTION SYSTEM TO EXTENTED THE BENEFIT OF 100% HOUSEHOLD BY PROVIDING FUNCTIONAL FHTC FOR THE LEFT OUT AREAS IN ZONE- V AT FALTA BLOCK WITHIN 'MEGA SURFACE WATER BASED WATER SUPPLY SCHEME FOR FALTA- MATHURAPUR,DISTRICT SOUTH 24 (SM/14477) |
54.8 |
2859/AD |
06/07/2024 |
FAD/001022/2024 |
09/07/2024 |
FAD/001022/2024 |
54.8 |