1 |
Alipore Division |
000008BILL/00645/2024-202 |
BILL/00645/2024-2025 |
28/06/2024 |
M/S B.N.ENTERPRISE |
Laying distribution system of piped water supply at Zone-XIV of Mathurapur - I Block for Mega Surface water based water supply scheme for Falta-Mathurapur, District South 24 Parganas under Raidighi Sub-Division of Alipore Division, P.H.E. Dte. (2nd call) |
000008ORD/000901/2021-202 |
ORD/000901/2021-2022 |
4943/AD |
16/12/2021 |
3.68 |
AUGMENTATION OF DISTRIBUTION SYSTEM INCLUDING OHR WITH ALLIED WORKS UNDER ZONE-XIV, MATHURAPUR-I BLOCK FOR PROVIDING FHTC TO ALL THE HOUSEHOLDS I/C/W JJM UNDER MEGA SURFACE WATER BASED W/S/S FOR FALTA-MATHURAPUR UNDER ALIPORE DIVISION, PHE DTE. (SM/15058) |
3.68 |
2921/AD |
10/07/2024 |
FAD/001051/2024 |
15/07/2024 |
FAD/001051/2024 |
3.68 |
2 |
Alipore Division |
000008BILL/00648/2024-202 |
BILL/00648/2024-2025 |
28/06/2024 |
M/S ASCON |
Laying distribution system, Functional Household Tap Connection (FHTC) to all households for Rajrajeshwarpur Water Supply Scheme, Block - Pathar Pratima for implementation of JJM under Kakdwip Sub-Division of Alipore Division, P.H.E. Dte. (Part-B) [No. |
000008ORD/001744/2022-202 |
ORD/001744/2022-2023 |
11559/AD |
17/02/2023 |
13.77 |
GROUND WATER BASED WATER SUPPLY SCHEME FOR RAJRAJESHWARPUR, BLOCK PATHARPRATIMA DISTRICT SOUTH 24 PARGANAS UNDER ALIPORE DIVISION (SM/13868) |
13.77 |
2773/AD |
28/06/2024 |
FAD/000957/2024 |
08/07/2024 |
FAD/000957/2024 |
13.77 |
3 |
Alipore Division |
000008BILL/00649/2024-202 |
BILL/00649/2024-2025 |
28/06/2024 |
AQUATECH ENGINEERS |
Sinking of 02 Nos. 250mm x 150mm dia. 360 mtr. deep Tubewell by D.R. Rig method using UPVC Pipe & Pre-packed Resin Bonded Gravel Filter at 1st and 2nd Tubewell Site of Uttar Chandanpiri Water Supply Scheme, Block - Namkhana for implementation of JJM unde |
000008ORD/000571/2023-202 |
ORD/000571/2023-2024 |
2259/AD |
14/08/2023 |
17.61 |
UTTAR CHANDANPIRI & ADJOINING MOUZAS PIPED WATER SUPPLY SCHEME IN NAMKHANA BLOCK IN SOUTH 24 PARGANAS UNDER KAKDWIP SUB-DIVISION OF ALIPORE DIVISION, PHE DTE. (SM/18683) |
17.61 |
2773/AD |
28/06/2024 |
FAD/000957/2024 |
08/07/2024 |
FAD/000957/2024 |
17.61 |
4 |
Alipore Division |
000008BILL/00651/2024-202 |
BILL/00651/2024-2025 |
28/06/2024 |
BHATTACHARJEE & CO. |
Sinking of 03 (three) Nos. 250mm x 150mm dia. 360 mtr. deep Tubewell by Direct Rotary Rig Method using P.V.C pipe and pre-packed Resin Bonded Gravel Filter of Matherdighi W/S Scheme (Zone-I), Block - Canning-II under Canning Sub Division of Alipore Divisi |
000008ORD/000550/2023-202 |
ORD/000550/2023-2024 |
2082/AD |
07/08/2023 |
32.25 |
AUGMENTATION OF GROUND WATER BASED MATHER DIGHI (ZONE-I,II & III) PIPED WATER SUPPLY SCHEME UNDER ALIPORE DIVISION, PHE DTE,BLOCK-CANNING-II,DISTRICT-SOUTH 24 PARGANAS (SM/18280) |
32.25 |
2773/AD |
28/06/2024 |
FAD/000957/2024 |
08/07/2024 |
FAD/000957/2024 |
32.25 |
5 |
Alipore Division |
000008BILL/00653/2024-202 |
BILL/00653/2024-2025 |
28/06/2024 |
UNIQUE AGENCY (PARTNER) |
Construction of 150 cum. Over Head Reservoir (OHR) (20 mtr. Staging Height) along with 2 nos. Pump House, Laying distribution system, Rising Main, Functional Household Tap Connection (FHTC) to all households including design & drawing of pile foundation & |
000008ORD/001856/2022-202 |
ORD/001856/2022-2023 |
12410/AD |
09/03/2023 |
34.46 |
AUGMENTATION OF GROUND WATER BASED HARADHANPUR (ZONE-I & II), PIPE WATER SUPPLY SCHEME Phase-B, UNDER ALIPORE DIVISION, BLOCK : SAGAR, DISTRICT : SOUTH 24 PARGANAS (SM/14159) |
34.46 |
2774/AD |
28/06/2024 |
FAD/000957/2024 |
08/07/2024 |
FAD/000957/2024 |
34.46 |
6 |
Alipore Division |
000008BILL/00654/2024-202 |
BILL/00654/2024-2025 |
28/06/2024 |
M/S B. ENTERPRISE |
Construction of 200 cum. Over Head Reservoir (OHR), (20 mtr. Staging Height) along with 2 Nos. Pump House, Laying distribution system, Rising Main, Functional Household Tap Connection (FHTC) to all households including design & drawing of pile foundation |
000008ORD/001142/2023-202 |
ORD/001142/2023-2024 |
3655/AD |
31/10/2023 |
137.3 |
AUGMENTATION OF GROUND WATER BASED NARAYANPUR PWSS TO ACCOMMODATE FHTC IN NAMKHANA BLOCK UNDER KAKDWIP SUB DIVISION OF ALIPORE DIVISION IN SOUTH 24PARGANAS DISTRICT (SM/18984) |
137.3 |
2781/AD |
29/06/2024 |
FAD/000957/2024 |
08/07/2024 |
FAD/000957/2024 |
137.3 |
7 |
Alipore Division |
000008BILL/00655/2024-202 |
BILL/00655/2024-2025 |
29/06/2024 |
SOMA ENTERPRISE |
Sinking of 03 (three) Nos. 250mm x 150mm dia. 360 mtr. deep Tubewell by Direct Rotary Rig Method using P.V.C pipe and pre-packed Resin Bonded Gravel Filter of Basanti W/S Scheme (Zone-IX), Block - Basanti under Canning Sub Division of Alipore Division, PH |
000008ORD/001871/2022-202 |
ORD/001871/2022-2023 |
12463/AD |
10/03/2023 |
18.54 |
Augmentation & Retrofitting of Basanti Zone-IX PWSS for providing Functional Household tap Connection (FHTC) Block - Basanti under canning Sub - Division, PHE dte. (SM/15963) |
18.54 |
2781/AD |
29/06/2024 |
FAD/000957/2024 |
08/07/2024 |
FAD/000957/2024 |
18.54 |
8 |
Alipore Division |
000008BILL/00659/2022-202 |
BILL/00659/2022-2023 |
06/03/2023 |
NATURAL RESOURCES CONSORTIUM |
Providing service by assigning Resource Person for a period of 3 months supervision of process of preparation for NABL recognition for Chemical Testing of potable water of Sub-District level Water Quality Testing Laboratory including supply, installation |
000008ORD/000555/2021-202 |
ORD/000555/2021-2022 |
870/CSD |
24/09/2021 |
0.33 |
Up-gradation of PHED & NGO Managed Laboratories under Water Quality Monitoring & Surveillance Programme for 2018-19 (SM/06349) |
0.33 |
12361/AD |
09/03/2023 |
FAD/002682/2022 |
13/03/2023 |
3328/DPHE-12/14 |
0.33 |
9 |
Alipore Division |
000008BILL/00671/2024-202 |
BILL/00671/2024-2025 |
02/07/2024 |
FIROJA KHATUN |
Hiring of an Inspection Vehicle (Diesel Operated with Luxury Permit) for use of the Assistant Engineer (HQ-I) under
Alipore Division, PHE Dte. (From 01.09.2023 to 29.02.2024) |
000008ORD/001043/2023-202 |
ORD/001043/2023-2024 |
155-/HQ-I/ |
31/08/2023 |
0.31 |
GROUND WATER BASED LASKHMIPUR, PIPE WATER SUPPLY SCHEME Phase-B, UNDER ALIPORE DIVISION, BLOCK : KAKDWIP, DISTRICT : SOUTH 24 PARGANAS (SM/11877) |
0.31 |
2796/AD |
02/07/2024 |
FAD/000935/2024 |
08/07/2024 |
FAD/000935/2024 |
0.31 |
10 |
Alipore Division |
000008BILL/00672/2024-202 |
BILL/00672/2024-2025 |
02/07/2024 |
FIROJA KHATUN |
Hiring of an Inspection Vehicle (Diesel Operated with Luxury Permit) for use of the Assistant Engineer (HQ-I) under
Alipore Division, PHE Dte. (From 01.03.2024 To 31.08.2024) |
000008ORD/002393/2023-202 |
ORD/002393/2023-2024 |
1195/AD |
28/02/2024 |
0.33 |
GROUND WATER BASED LASKHMIPUR, PIPE WATER SUPPLY SCHEME Phase-B, UNDER ALIPORE DIVISION, BLOCK : KAKDWIP, DISTRICT : SOUTH 24 PARGANAS (SM/11877) |
0.33 |
2796/AD |
02/07/2024 |
FAD/000935/2024 |
08/07/2024 |
FAD/000935/2024 |
0.33 |
11 |
Alipore Division |
000008BILL/00674/2024-202 |
BILL/00674/2024-2025 |
02/07/2024 |
SUBRATA GHOSH |
Augmentation of laying distribution system including construction of 600 m3 capacity OHR to extend the benefit of 100% household by Providing Functional Household Tap Connection (FHTC) from distribution system in Zone-VIII(B) at Falta block within "Mega |
000008ORD/000304/2023-202 |
ORD/000304/2023-2024 |
1507/AD |
15/07/2023 |
29.8 |
AUGMENTATION IN DISTRIBUTION SYSTEM WITH CONSTRUCTION OF OHR AND ALLIED WORKS TO EXTEND THE BENEFIT OF 100% HOUSEHOLD BY PROVIDING FHTC UNDER ZONE-VIII OF FALTA BLOCK WITHIN ' MEGA SURFACE WATER BASED WATER SUPPLY SCHEME FOR FALTA-MATHURAPUR, DISTRICT SOU (SM/14468) |
29.8 |
2806/AD |
02/07/2024 |
FAD/000957/2024 |
08/07/2024 |
FAD/000957/2024 |
29.8 |
12 |
Alipore Division |
000008BILL/00675/2024-202 |
BILL/00675/2024-2025 |
02/07/2024 |
SYN DEVELOPERS PVT. LTD. |
Construction of 150 cum. Over Head Reservoir (OHR), (20 mtr. Staging Height) along with Pump House, Laying distribution system, Rising Main, Functional Household Tap Connection (FHTC) to all households including design & drawing of foundation after soil i |
000008ORD/000619/2023-202 |
ORD/000619/2023-2024 |
3730/AD |
03/11/2023 |
41.39 |
GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR DAKSHIN LAKHINARAYANPUR, UNDER ALIPORE DIVISION, BLOCK : PATHARPRATIMA, DISTRICT : SOUTH 24 PARGANAS (SM/13869) |
41.39 |
2806/AD |
02/07/2024 |
FAD/000957/2024 |
08/07/2024 |
FAD/000957/2024 |
41.39 |
13 |
Alipore Division |
000008BILL/00678/2024-202 |
BILL/00678/2024-2025 |
02/07/2024 |
INDRANIL DUTTA & ASSOCIATES |
Providing support services for data mapping of available data within command area for preparation of GMIS of Shibpur W/S Scheme, Block - Namkhana for implementation of JJM under Kakdwip Sub-Division of Alipore Division, P.H.E. Dte. |
000008ORD/001994/2023-202 |
ORD/001994/2023-2024 |
467/KSD |
22/09/2023 |
3.8 |
AUGMENTATION FOR GROUND WATER BASED SHIBPUR PIPE WATER SUPPLY SCHEME, Phase-B, UNDER ALIPORE DIVISION, BLOCK : NAMKHANA, DISTRICT : SOUTH 24 PARGANAS (SM/11875) |
3.8 |
2806/AD |
02/07/2024 |
FAD/000957/2024 |
08/07/2024 |
FAD/000957/2024 |
3.8 |
14 |
Alipore Division |
000008BILL/00679/2024-202 |
BILL/00679/2024-2025 |
02/07/2024 |
M/S R.DUTTA & CO. |
Conducting route survey, design distribution network and preparation & submission of DPR for each of different new water supply scheme / each Augmentation water supply scheme (NARAYANPUR )) including Functional Household Tap Connection (FHTC) for implemen |
000008ORD/001364/2023-202 |
ORD/001364/2023-2024 |
3437/AD |
12/10/2023 |
15.05 |
AUGMENTATION OF GROUND WATER BASED NARAYANPUR PWSS TO ACCOMMODATE FHTC IN NAMKHANA BLOCK UNDER KAKDWIP SUB DIVISION OF ALIPORE DIVISION IN SOUTH 24PARGANAS DISTRICT (SM/18984) |
15.05 |
2806/AD |
02/07/2024 |
FAD/000957/2024 |
08/07/2024 |
FAD/000957/2024 |
15.05 |
15 |
Alipore Division |
000008BILL/00698/2024-202 |
BILL/00698/2024-2025 |
04/07/2024 |
SARADA CONSTRUCTION |
Sinking of 02 Nos. 250mm x 150mm dia. 360 mtr. deep Tubewell by D.R. Rig method using UPVC Pipe and Pre-packed Resin Bonded Gravel Filter at 1st and 2nd Tubewell Site of Krishnadaspur W/S Scheme, Block - Pathar Pratima for implementation of JJM under Kakd |
000008ORD/002135/2023-202 |
ORD/002135/2023-2024 |
822/AD |
05/02/2024 |
22.52 |
GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR KRISHNADASPUR , UNDER ALIPORE DIVISION, BLOCK : PATHARPRATIMA, DISTRICT : SOUTH 24 PARGANAS (SM/13871) |
22.52 |
2834/AD |
04/07/2024 |
FAD/001021/2024 |
08/07/2024 |
FAD/001021/2024 |
22.52 |
16 |
Alipore Division |
000008BILL/00707/2024-202 |
BILL/00707/2024-2025 |
05/07/2024 |
TANMAY ROY CHOWDHURY |
Supplying, fitting, fixing and delivery of different dia. specials for Augmentation of Companir Char W/S Scheme under JJM, Block- Sagar under Kakdwip Sub-Division of Alipore Division, P.H.E. Dte. |
000008ORD/000717/2023-202 |
ORD/000717/2023-2024 |
2535/AD |
28/08/2023 |
9.03 |
AUGMENTATION OF GROUND WATER BASED COMPANIR CHAR, PIPE WATER SUPPLY SCHEME Phase-B, UNDER ALIPORE DIVISION, BLOCK : SAGAR, DISTRICT : SOUTH 24 PARGANAS (SM/11748) |
9.03 |
2858/AD |
06/07/2024 |
FAD/001022/2024 |
09/07/2024 |
FAD/001022/2024 |
9.03 |
17 |
Alipore Division |
000008BILL/00709/2024-202 |
BILL/00709/2024-2025 |
06/07/2024 |
SWAPAN KUMAR MANDAL |
Hiring of 1 (One) No. Diesel Car / Luxury Taxi for supervision of different works Under JJM at Canning Sub-Division of Alipore Division, PHE Dte. for 1 (one) Year from the issuance of work order. |
000008ORD/002175/2022-202 |
ORD/002175/2022-2023 |
1354/CSD |
20/02/2023 |
2.28 |
AUGMENTATION & RETROFITTING OF ADHIA PWSS FOR PROVIDING FUNCTIONAL HOUSEHOLD TAP CONNECTION (FHTC) (SM/15477) |
2.28 |
2858/AD |
06/07/2024 |
FAD/001022/2024 |
09/07/2024 |
FAD/001022/2024 |
2.28 |
18 |
Alipore Division |
000008BILL/00716/2024-202 |
BILL/00716/2024-2025 |
06/07/2024 |
CONCORD ENGINEERING |
Augmentation of laying distribution system to extend the benefit of 100% household by proving Functional Household Tap Connection (FHTC) for leftout areas and construction of platform for existing FHTC with allied works in Zone-V of Falta block within M |
000008ORD/001391/2022-202 |
ORD/001391/2022-2023 |
10863/AD |
04/02/2023 |
54.8 |
AUGMENTATION OF LAYING DISTRIBUTION SYSTEM TO EXTENTED THE BENEFIT OF 100% HOUSEHOLD BY PROVIDING FUNCTIONAL FHTC FOR THE LEFT OUT AREAS IN ZONE- V AT FALTA BLOCK WITHIN 'MEGA SURFACE WATER BASED WATER SUPPLY SCHEME FOR FALTA- MATHURAPUR,DISTRICT SOUTH 24 (SM/14477) |
54.8 |
2859/AD |
06/07/2024 |
FAD/001022/2024 |
09/07/2024 |
FAD/001022/2024 |
54.8 |
19 |
Alipore Division |
000008BILL/00719/2024-202 |
BILL/00719/2024-2025 |
08/07/2024 |
S. CHAKRABORTY AND CO. |
Sinking of 01 No. 250mm x 150mm dia. 360 mtr. deep Replacement Tubewell by D.R. Rig method using UPVC Pipe & Pre-packed Resin Bonded Gravel Filter at Head Work Site of Ramtanunagar W/S Scheme, Block - Kakdwip for implementation of JJM under Kakdwip Sub-Di |
000008ORD/002132/2023-202 |
ORD/002132/2023-2024 |
820/AD |
05/02/2024 |
16.87 |
AUGMENTATION OF GROUND WATER BASED RAMTANUNAGAR , PIPE WATER SUPPLY SCHEME Phase-B, UNDER ALIPORE DIVISION, BLOCK : KAKDWIP, DISTRICT : SOUTH 24 PARGANAS (SM/11751) |
16.87 |
2873/AD |
08/07/2024 |
FAD/001022/2024 |
09/07/2024 |
FAD/001022/2024 |
16.87 |
20 |
Alipore Division |
000008BILL/00720/2024-202 |
BILL/00720/2024-2025 |
08/07/2024 |
M/S B. ENTERPRISE |
Construction of boundary wall along with Land Development and Plinth Protection and Approach Road for Pump House at Head Work Site of Ramnagar Abad W/S scheme, Block : Pathar Pratima under JJM of Kakdwip Sub-Division under Alipore Division, P.H.E. Dte. |
000008ORD/002162/2023-202 |
ORD/002162/2023-2024 |
806/AD |
05/02/2024 |
27.43 |
Ramnagar Abad Piped Water Supply Scheme. (SM/16759) |
27.43 |
2873/AD |
08/07/2024 |
FAD/001022/2024 |
09/07/2024 |
FAD/001022/2024 |
27.43 |
21 |
Alipore Division |
000008BILL/00721/2024-202 |
BILL/00721/2024-2025 |
08/07/2024 |
M/S S.M. CONSTRUCTION |
Laying distribution system for providing Functional Household Tap Connection (FHTC) to all households for Augmentation of Manasadwip (Zone-I & II) Water Supply Scheme, Block - Sagar for implementation of JJM under Kakdwip Sub-Division of Alipore Division, |
000008ORD/002431/2023-202 |
ORD/002431/2023-2024 |
366/KSD |
19/02/2024 |
4.49 |
AUGMENTATION OF GROUND WATER BASED MANASADWIP (ZONE-I & II), PIPE WATER SUPPLY SCHEME Phase-B, UNDER ALIPORE DIVISION, BLOCK : SAGAR, DISTRICT : SOUTH 24 PARGANAS (SM/14518) |
4.49 |
2873/AD |
08/07/2024 |
FAD/001022/2024 |
09/07/2024 |
FAD/001022/2024 |
4.49 |
22 |
Alipore Division |
000008BILL/00722/2024-202 |
BILL/00722/2024-2025 |
08/07/2024 |
RIVER BENZ CONSTRUCTION |
Laying Distribution System, Providing Functional Household Tap Connection for Ground Water Based Augmentation Piped Water Supply Scheme for the Sonakhali (Zone-II), Block-Basanti under Canning Sub-Division of Alipore Division, PHE Dte. [No. of FHTC = 1220 |
000008ORD/000256/2023-202 |
ORD/000256/2023-2024 |
1444/AD |
13/07/2023 |
47.36 |
AUGMENTATION OF SONAKHALI (ZONE-II) PIPED WATER SUPPLY SCHEME. (SM/16116) |
47.36 |
2873/AD |
08/07/2024 |
FAD/001022/2024 |
09/07/2024 |
FAD/001022/2024 |
47.36 |
23 |
Alipore Division |
000008BILL/00725/2024-202 |
BILL/00725/2024-2025 |
08/07/2024 |
SARADA CONSTRUCTION |
Sinking of 01 No. 250mm x 150mm dia. 360 mtr. deep Tubewell by D.R. Rig method using UPVC Pipe & Pre-packed Resin Bonded Gravel Filter for Radhakrishnapur W/S Scheme, Block - Sagar for implementation of JJM under Kakdwip Sub-Division of Alipore Division, |
000008ORD/001476/2023-202 |
ORD/001476/2023-2024 |
4685/AD |
18/12/2023 |
24.83 |
AUGMENTATION FOR GROUND WATER BASED RADHAKRISHNAPUR , PIPE WATER SUPPLY SCHEME Phase-B, UNDER ALIPORE DIVISION, BLOCK : SAGAR, DISTRICT : SOUTH 24 PARGANAS (SM/13972) |
24.83 |
2873/AD |
08/07/2024 |
FAD/001022/2024 |
09/07/2024 |
FAD/001022/2024 |
24.83 |
24 |
Alipore Division |
000008BILL/00728/2024-202 |
BILL/00728/2024-2025 |
08/07/2024 |
SIMPLEX DRILLING CO. |
Sinking of 01 No. 250mm x 150mm dia. 360 mtr. deep Replacement Tubewell by D.R. Rig method using UPVC Pipe & Pre-packed Resin Bonded Gravel Filter at 1st Tubewell Site for Haradhanpur W/S Scheme, Block - Sagar for implementation of JJM under Kakdwip Sub-D |
000008ORD/001477/2023-202 |
ORD/001477/2023-2024 |
4686/AD |
18/12/2023 |
22.47 |
AUGMENTATION OF GROUND WATER BASED HARADHANPUR (ZONE-I & II), PIPE WATER SUPPLY SCHEME Phase-B, UNDER ALIPORE DIVISION, BLOCK : SAGAR, DISTRICT : SOUTH 24 PARGANAS (SM/14159) |
22.47 |
2873/AD |
08/07/2024 |
FAD/001022/2024 |
09/07/2024 |
FAD/001022/2024 |
22.47 |
25 |
Alipore Division |
000008BILL/00729/2024-202 |
BILL/00729/2024-2025 |
08/07/2024 |
M/S A.K. GHATAK |
Laying distribution system, Functional Household Tap Connection (FHTC) to all households and Construction of 02 nos. Pump House for Banashyam Nagar Water Supply Scheme, Block - Pathar Pratima for implementation of JJM under Kakdwip Sub-Division of Alipore |
000008ORD/000784/2022-202 |
ORD/000784/2022-2023 |
6538/AD |
11/11/2022 |
12.14 |
GROUND WATER BASED BANASHYAM NAGAR PIPE WATER SUPPLY SCHEME UNDER ALIPORE DIVISION PHE DTE., BLOCK-PATHARPRATIMA, DISTRICT - SOUTH 24 PARGANAS (SM/11848) |
12.14 |
2873/AD |
08/07/2024 |
FAD/001022/2024 |
09/07/2024 |
FAD/001022/2024 |
12.14 |
26 |
Alipore Division |
000008BILL/00730/2024-202 |
BILL/00730/2024-2025 |
08/07/2024 |
S.R. CONSTRUCTION |
Construction of boundary wall along with Land Development, Plinth Protection and Approach Road for Pump House at 3rd Tubewell Site for Augmentation of Ramtanunagar W/S scheme, Block : Kakdwip under JJM of Kakdwip Sub-Division under Alipore Division, P.H.E |
000008ORD/001163/2023-202 |
ORD/001163/2023-2024 |
3725/AD |
03/11/2023 |
6.04 |
AUGMENTATION OF GROUND WATER BASED RAMTANUNAGAR , PIPE WATER SUPPLY SCHEME Phase-B, UNDER ALIPORE DIVISION, BLOCK : KAKDWIP, DISTRICT : SOUTH 24 PARGANAS (SM/11751) |
6.04 |
2873/AD |
08/07/2024 |
FAD/001022/2024 |
09/07/2024 |
FAD/001022/2024 |
6.04 |
27 |
Alipore Division |
000008BILL/00731/2024-202 |
BILL/00731/2024-2025 |
08/07/2024 |
VISHAL CONSTRUCTION CO. |
Augmentation of laying distribution system including construction of 600 cum capacity of OHR to extend the benefit of 100% household by Providing Functional Household Tap Connection (FHTC) from distribution system in Zone- VIII Lakshmipur at Diamond Har |
000008ORD/001015/2023-202 |
ORD/001015/2023-2024 |
1316/AD |
05/03/2024 |
23.02 |
AUGMENTATION OF LAYING DISTRIBUTION SYSTEM TO EXTEND THE BENEFIT OF 100% HOUSEHOLDS BY PROVIDING FHTC UNDER ZONE-VIII OF DIAMOND HARBOUR-I BLOCK WITHIN 'MEGA SURFACE WATER BASED WATER SUPPLY SCHEME FOR FALTA-MATHURAPUR, DISTRICT-SOUTH 24 PARGANAS' UNDER D (SM/15321) |
23.02 |
2873/AD |
08/07/2024 |
FAD/001022/2024 |
09/07/2024 |
FAD/001022/2024 |
23.02 |
28 |
Alipore Division |
000008BILL/00732/2024-202 |
BILL/00732/2024-2025 |
08/07/2024 |
M/S. SUMAN ENTERPRISE |
Remodeling of distribution system for providing Functional Household Tap Connection (FHTC) to all the households in Zone-XII of Mathurapur-I Block including Operation & Maintenance of scheme for 1 (one) year under "Mega Surface Water based water supply sc |
000008ORD/000115/2022-202 |
ORD/000115/2022-2023 |
1660/AD |
10/06/2022 |
31.17 |
AUGMENTATION OF DISTRIBUTION SYSTEM UNDER ZONE-XII, MATHURAPUR-I BLOCK FOR PROVIDING FHTC TO ALL THE HOUSEHOLDS I/C/W JJM UNDER MEGA SURFACE WATER BASED W/S/S FOR FALTA-MATHURAPUR UNDER ALIPORE DIVISION, PHE DTE. (SM/15493) |
31.17 |
2874/AD |
08/07/2024 |
FAD/001022/2024 |
09/07/2024 |
FAD/001022/2024 |
31.17 |
29 |
Alipore Division |
000008BILL/00733/2024-202 |
BILL/00733/2024-2025 |
08/07/2024 |
M/S B.M. CONSTRUCTION |
Remodeling of Distribution System of Krishnachandrapur PWS Scheme as Zone-III of Mathurapur - I Block under Mega Surface water based water supply scheme for Falta-Mathurapur, District South 24 Parganas under Raidighi Sub-Division of Alipore Division, P. |
000008ORD/000034/2022-202 |
ORD/000034/2022-2023 |
597/AD |
28/04/2022 |
13.34 |
AUGMENTATION OF DISTRIBUTION SYSTEM INCLUDING OHR UNDER ZONE-III, MATHURAPUR-I BLOCK FOR PROVIDING FUNCTIONAL HOUSEHOLD TAP CONNECTION (FHTC) IN CONNECTION WITH JAL JEEVAN MISSION (JJM) UNDER MEGA SURFACE WATER BASED WATER SUPPLY SCHEME FOR FALTA-MATHURAP (SM/15469) |
13.34 |
2921/AD |
10/07/2024 |
FAD/001051/2024 |
15/07/2024 |
FAD/001051/2024 |
13.34 |
30 |
Alipore Division |
000008BILL/00738/2024-202 |
BILL/00738/2024-2025 |
08/07/2024 |
SATYAM CONSTRUCTION |
Sinking of 250mm x 150mm dia. 360 mtr. deep Tubewell (New) by Direct Rotary Rig Method using P.V.C pipe and pre-packed Resin Bonded Gravel Filter at Tube Well No. - 5 of Augmentation of Atharabeki W/S Scheme, Block - Canning-II under Canning Sub Division |
000008ORD/001667/2022-202 |
ORD/001667/2022-2023 |
11479/AD |
15/02/2023 |
17.21 |
AUGMENTATION AND RETROFITTING OF ATHARABEKI PIPED WATER SUPPLY SCHEME FOR PROVIDING FUNCTIONAL HOUSEHOLD TAP CONNECTION (FHTC) (SM/15097) |
17.21 |
2877/AD |
08/07/2024 |
FAD/001022/2024 |
09/07/2024 |
FAD/001022/2024 |
17.21 |
31 |
Alipore Division |
000008BILL/00739/2024-202 |
BILL/00739/2024-2025 |
08/07/2024 |
GEOTECHNICAL ENGINEERS CONSORT |
Preparation of design (Pile and Pile Cap) drawing for foundation of different capacity OHR of Sridharnagar (Zone - I & II) PWSS under JJM at Pathar Pratima Block under Kakdwip Sub-Division of Alipore Division P.H.E. Dte. (Zone-I) |
000008ORD/002609/2023-202 |
ORD/002609/2023-2024 |
304/KSD |
08/02/2024 |
0.49 |
AUGMENTATION OF GROUND WATER BASED SRIDHARNAGAR PIPED WATER SUPPLY SCHEME UNDER ALIPORE DIVISION, PHE DTE, BLOCK-PATHARPRATIMA, DISTRICT-SOUTH 24 PARGANAS (SM/14986) |
0.49 |
2877/AD |
08/07/2024 |
FAD/001022/2024 |
09/07/2024 |
FAD/001022/2024 |
0.49 |
32 |
Alipore Division |
000008BILL/00740/2024-202 |
BILL/00740/2024-2025 |
08/07/2024 |
GEOTECHNICAL ENGINEERS CONSORT |
Preparation of design (Pile and Pile Cap) drawing for foundation of different capacity OHR of Nebutala PWSS under JJM at Kakdwip Block under Kakdwip Sub-Division of Alipore Division P.H.E.D. |
000008ORD/002597/2023-202 |
ORD/002597/2023-2024 |
176/KSD |
09/01/2024 |
0.49 |
AUGMENTATION OF GROUND WATER BASED NEBUTALA, PIPE WATER SUPPLY SCHEME Phase-B, UNDER ALIPORE DIVISION, BLOCK : KAKDWIP, DISTRICT : SOUTH 24 PARGANAS (SM/11750) |
0.49 |
2877/AD |
08/07/2024 |
FAD/001022/2024 |
09/07/2024 |
FAD/001022/2024 |
0.49 |
33 |
Alipore Division |
000008BILL/00741/2024-202 |
BILL/00741/2024-2025 |
08/07/2024 |
GEOTECHNICAL ENGINEERS CONSORT |
Preparation of design (Pile and Pile Cap) drawing for foundation of different capacity OHR of Sridharnagar Zone - I & II PWSS under JJM at Pathar Pratima Block under Kakdwip Sub-Division of Alipore Division P.H.E. Dte. (Zone-II) |
000008ORD/002604/2023-202 |
ORD/002604/2023-2024 |
290/KSD |
07/02/2024 |
0.49 |
AUGMENTATION OF GROUND WATER BASED SRIDHARNAGAR PIPED WATER SUPPLY SCHEME UNDER ALIPORE DIVISION, PHE DTE, BLOCK-PATHARPRATIMA, DISTRICT-SOUTH 24 PARGANAS (SM/14986) |
0.49 |
2877/AD |
08/07/2024 |
FAD/001022/2024 |
09/07/2024 |
FAD/001022/2024 |
0.49 |
34 |
Alipore Division |
000008BILL/00746/2024-202 |
BILL/00746/2024-2025 |
08/07/2024 |
GEOTECHNICAL ENGINEERS CONSORT |
Preparation of design (Pile and Pile Cap) drawing for foundation of different capacity OHR of Baliara PWSS under JJM at Namkhana Block under Kakdwip Sub-Division of Alipore Division P.H.E. Dte. |
000008ORD/002602/2023-202 |
ORD/002602/2023-2024 |
227/KSD |
24/01/2024 |
0.49 |
BALIARA PIPED WATER SUPPLY SCHEME IN NAMKHANA BLOCK IN SOUTH 24 PARGANAS, WEST BENGAL UNDER JAL JEEVAN MISSION UNDER KAKDWIP SUB-DIVISION OF ALIPORE DIVISION, PHE DTE. (SM/18392) |
0.49 |
2877/AD |
08/07/2024 |
FAD/001022/2024 |
09/07/2024 |
FAD/001022/2024 |
0.49 |
35 |
Alipore Division |
000008BILL/00748/2024-202 |
BILL/00748/2024-2025 |
08/07/2024 |
GEOTECHNICAL ENGINEERS CONSORT |
Preparation of design (Pile and Pile Cap) drawing for foundation of different capacity OHR of Gangadharpur Zone - I & II PWSS under JJM at Kakdwip Block under Kakdwip Sub-Division of Alipore Division P.H.E. Dte. (Zone-I) |
000008ORD/002600/2023-202 |
ORD/002600/2023-2024 |
178/KSD |
09/01/2024 |
0.49 |
AUGMENTATION OF GROUND WATER BASED GANGADHARPUR (ZONE - I & II), PIPE WATER SUPPLY SCHEME Phase-B, UNDER ALIPORE DIVISION, BLOCK : KAKDWIP, DISTRICT : SOUTH 24 PARGANAS (SM/11805) |
0.49 |
2877/AD |
08/07/2024 |
FAD/001022/2024 |
09/07/2024 |
FAD/001022/2024 |
0.49 |
36 |
Alipore Division |
000008BILL/00749/2024-202 |
BILL/00749/2024-2025 |
08/07/2024 |
GEOTECHNICAL ENGINEERS CONSORT |
Preparation of design (Pile and Pile Cap) drawing for foundation of different capacity OHR of Gangadharpur Zone - I & II PWSS under JJM at Kakdwip Block under Kakdwip Sub-Division of Alipore Division P.H.E. Dte. (Zone-II) |
000008ORD/002599/2023-202 |
ORD/002599/2023-2024 |
177/KSD |
09/01/2024 |
0.49 |
AUGMENTATION OF GROUND WATER BASED GANGADHARPUR (ZONE - I & II), PIPE WATER SUPPLY SCHEME Phase-B, UNDER ALIPORE DIVISION, BLOCK : KAKDWIP, DISTRICT : SOUTH 24 PARGANAS (SM/11805) |
0.49 |
2877/AD |
08/07/2024 |
FAD/001022/2024 |
09/07/2024 |
FAD/001022/2024 |
0.49 |
37 |
Alipore Division |
000008BILL/00754/2024-202 |
BILL/00754/2024-2025 |
08/07/2024 |
BIMALENDU GIRI |
Making and fixing of permanent display board at headwork site of Durganagar, Iswaripur, Ganeshnagar Zone-I, Ganeshnagar Zone-II, Narayanpur Zone- I & II PWSS under JJM at Namkhana Block under Kakdwip Sub-Division of Alipore Division P.H.E.D. |
000008ORD/002118/2023-202 |
ORD/002118/2023-2024 |
934/KSD |
19/12/2023 |
0.94 |
AUGMENTATION OF GROUND WATER BASED NARAYANPUR PWSS TO ACCOMMODATE FHTC IN NAMKHANA BLOCK UNDER KAKDWIP SUB DIVISION OF ALIPORE DIVISION IN SOUTH 24PARGANAS DISTRICT (SM/18984) |
0.31 |
2887/AD |
08/07/2024 |
FAD/001022/2024 |
09/07/2024 |
FAD/001022/2024 |
0.31 |
38 |
Alipore Division |
000008BILL/00758/2024-202 |
BILL/00758/2024-2025 |
09/07/2024 |
M/S P. B. CONSTRUCTION |
Laying distribution system, construction of 01 no. pump house size 5.40mtr. x 3.60 mtr., Functional Household Tap Connection (FHTC) to all households including O & M of Laying distribution & FHTC for 1 year after completion of FHTC works for Narayanganj W |
000008ORD/001424/2023-202 |
ORD/001424/2023-2024 |
4603/AD |
14/12/2023 |
27.81 |
GROUND WATER BASED MINI PIPED WATER SUPPLY SCHEME FOR NARAYANGANJ, UNDER ALIPORE DIVISION, BLOCK : NAMKHANA, DISTRICT : SOUTH 24 PARGANAS. (SM/15046) |
27.81 |
2969/AD |
15/07/2024 |
FAD/001125/2024 |
18/07/2024 |
FAD/001125/2024 |
27.81 |
39 |
Alipore Division |
000008BILL/00760/2024-202 |
BILL/00760/2024-2025 |
09/07/2024 |
ANANTA KUMAR GIRI |
Making and fixing of permanent display board at headwork site of Shibpur Zone - I & II, Ghoramara PWSS under JJM at Sagar Block under Kakdwip Sub-Division of Alipore Division P.H.E.D. |
000008ORD/002175/2023-202 |
ORD/002175/2023-2024 |
954/KSD |
19/12/2023 |
0.61 |
AUGMENTATION FOR GROUND WATER BASED SHIBPUR (ZONE - I & II), PIPE WATER SUPPLY SCHEME Phase-B, UNDER ALIPORE DIVISION, BLOCK : SAGAR, DISTRICT : SOUTH 24 PARGANAS (SM/13788) |
0.4 |
2895/AD |
09/07/2024 |
FAD/001051/2024 |
15/07/2024 |
FAD/001051/2024 |
0.4 |
40 |
Alipore Division |
000008BILL/00761/2024-202 |
BILL/00761/2024-2025 |
09/07/2024 |
BIMALENDU GIRI |
Making and fixing of permanent display board at headwork site of Dhaspara Zone - I & II, Manasadwip Zone - I & II PWSS under JJM at Sagar Block under Kakdwip Sub-Division of Alipore Division P.H.E.D. |
000008ORD/002161/2023-202 |
ORD/002161/2023-2024 |
950/KSD |
19/12/2023 |
0.81 |
AUGMENTATION OF GROUND WATER BASED DHASPARA (ZONE-I & II), PIPE WATER SUPPLY SCHEME Phase-B, UNDER ALIPORE DIVISION, BLOCK : SAGAR, DISTRICT : SOUTH 24 PARGANAS (SM/15221) |
0.4 |
2895/AD |
09/07/2024 |
FAD/001051/2024 |
15/07/2024 |
FAD/001051/2024 |
0.4 |
41 |
Alipore Division |
000008BILL/00763/2024-202 |
BILL/00763/2024-2025 |
10/07/2024 |
M/S. LOKNATH CONSTRUCTION |
Laying of Pipeline and other allied works of AUGMENTATION OF GROUND WATER BASED MATHER DIGHI (ZONE-I,II and III) PIPED WATER SUPPLY SCHEME , Block ¿ Canning-II under Canning Sub-Division of Alipore Division, PHE Dte. (at Matherdighi, Zone-III) SM/18280 |
000008ORD/001018/2023-202 |
ORD/001018/2023-2024 |
3303/AD |
07/10/2023 |
4.71 |
AUGMENTATION OF GROUND WATER BASED MATHER DIGHI (ZONE-I,II & III) PIPED WATER SUPPLY SCHEME UNDER ALIPORE DIVISION, PHE DTE,BLOCK-CANNING-II,DISTRICT-SOUTH 24 PARGANAS (SM/18280) |
4.71 |
2916/AD |
10/07/2024 |
FAD/001051/2024 |
15/07/2024 |
FAD/001051/2024 |
4.71 |
42 |
Alipore Division |
000008BILL/00764/2024-202 |
BILL/00764/2024-2025 |
11/07/2024 |
ELECTROMECH |
Sinking of 02 (two) nos. 250mm x 150mm dia. 360 mtr. deep Tubewell (New) by Direct Rotary Rig Method using P.V.C pipe and pre-packed Resin Bonded Gravel Filter at Tube Well No. - 4 for each zone of Augmentation of Kalikatala (Zone - I & II) W/S Scheme, Bl |
000008ORD/001695/2022-202 |
ORD/001695/2022-2023 |
11626/AD |
18/02/2023 |
13.42 |
AUGMENTATION AND RETROFITTING OF KALIKATALA (ZONE-I & II) PIPED WATER SUPPLY SCHEME FOR PROVIDING FUNCTIONAL HOUSEHOLD TAP CONNECTION (FHTC) (SM/15472) |
13.42 |
2932/AD |
11/07/2024 |
FAD/001082/2024 |
15/07/2024 |
FAD/001082/2024 |
13.42 |
43 |
Alipore Division |
000008BILL/00765/2024-202 |
BILL/00765/2024-2025 |
11/07/2024 |
JYOTY SOLAR POWER |
Augmentation of laying distribution system including construction of 600 cum capacity of OHR to extend the benefit of 100% household by Providing Functional Household Tap Connection (FHTC) from distribution system with allied works in Zone-VII at Kamarp |
000008ORD/000305/2023-202 |
ORD/000305/2023-2024 |
1508/AD |
15/07/2023 |
21.19 |
AUGMENTATION IN DISTRIBUTION SYSTEM INCLUDING OHR WITH CONSTRUCTION OF OHR AND ALLIED WORKS TO EXTEND THE BENEFIT OF 100% HOUSEHOLDS BY PROVIDING FHTC UNDER ZONE-VII OF DIAMOND HARBOUR-II BLOCK WITHIN 'MEGA SURFACE WATER BASED WATER SUPPLY SCHEME FOR FALT (SM/14901) |
21.19 |
2932/AD |
11/07/2024 |
FAD/001082/2024 |
15/07/2024 |
FAD/001082/2024 |
21.19 |
44 |
Alipore Division |
000008BILL/00766/2024-202 |
BILL/00766/2024-2025 |
11/07/2024 |
SHRAYA ROADSLINE |
Construction of 100 cum. Over Head Reservoir (OHR), (20 mtr. Staging Height) along with Pump House, Laying distribution system, Rising Main, Functional Household Tap Connection (FHTC) to all households including design & drawing of foundation after soil |
000008ORD/001825/2022-202 |
ORD/001825/2022-2023 |
12121/AD |
01/03/2023 |
48.9 |
GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR KRISHNADASPUR , UNDER ALIPORE DIVISION, BLOCK : PATHARPRATIMA, DISTRICT : SOUTH 24 PARGANAS (SM/13871) |
48.9 |
2932/AD |
11/07/2024 |
FAD/001082/2024 |
15/07/2024 |
FAD/001082/2024 |
48.9 |
45 |
Alipore Division |
000008BILL/00767/2024-202 |
BILL/00767/2024-2025 |
11/07/2024 |
TANMAY ROY CHOWDHURY |
Construction of 350 cum. Over Head Reservoir (OHR), (20 mtr. Staging Height) including design & drawing of pile foundation & pile cap after soil investigation along with 1 no. Pump House and Laying distribution system, Rising Main, Functional Household Ta |
000008ORD/000671/2022-202 |
ORD/000671/2022-2023 |
6156/AD |
01/11/2022 |
52.4 |
AUGMENTATION OF GROUND WATER BASED COMPANIR CHAR, PIPE WATER SUPPLY SCHEME Phase-B, UNDER ALIPORE DIVISION, BLOCK : SAGAR, DISTRICT : SOUTH 24 PARGANAS (SM/11748) |
52.4 |
2932/AD |
11/07/2024 |
FAD/001082/2024 |
15/07/2024 |
FAD/001082/2024 |
52.4 |
46 |
Alipore Division |
000008BILL/00768/2024-202 |
BILL/00768/2024-2025 |
11/07/2024 |
SNEHA CONSTRUCTION |
Sinking of 03 (three) nos. 250mm x 150mm dia. 360 mtr. deep Tubewell by Direct Rotary Rig Method using P.V.C pipe and pre-packed Resin Bonded Gravel Filter at Augmentation of Basanti (Zone-I) W/S Scheme, Block - Basanti under Canning Sub Division of Alipo |
000008ORD/001349/2022-202 |
ORD/001349/2022-2023 |
10216/AD |
19/01/2023 |
21.84 |
AUGMENTATION AND RETROFITTING OF BASANTI (ZONE-I) PWSS FOR PROVIDING FHTC, BLOCK - BASANTI (SM/15053) |
21.84 |
2992/AD |
18/07/2024 |
FAD/001180/2024 |
22/07/2024 |
FAD/001180/2024 |
21.84 |
47 |
Alipore Division |
000008BILL/00769/2024-202 |
BILL/00769/2024-2025 |
11/07/2024 |
NITYANANDA MONDAL |
Supply and delivery at site of different dia. Specials in connection with laying distribution system and Rising Main system of piped water supply at Zone - III (Koutala PWSS) Mathurapur - II Block in connection with Jal Jeevan Mission (JJM) under Raidigh |
000008ORD/000277/2024-202 |
ORD/000277/2024-2025 |
2473/AD |
14/06/2024 |
7.42 |
AUGMENTATION OF DISTRIBUTION SYSTEM UNDER ZONE-III, MATHURAPUR-II BLOCK FOR PROVIDING FHTC TO ALL THE HOUSEHOLDS IN CONNECTION WITH JAL JEEVAN MISSION UNDER MEGA SURFACE BASED WATER SUPPLY CSHEME FOR FALTA MATHURAPUR UNDER ALIPORE DIVISION PHE DTE. (SM/15504) |
7.42 |
2932/AD |
11/07/2024 |
FAD/001082/2024 |
15/07/2024 |
FAD/001082/2024 |
7.42 |
48 |
Alipore Division |
000008BILL/00776/2024-202 |
BILL/00776/2024-2025 |
12/07/2024 |
M/S APEX ENGINEERING |
Conducting route survey, design distribution network and preparation & submission of DPR for Tilkumar (Zone-I, II & III) Augmentation Water Supply Scheme including Functional Household Tap Connection (FHTC) for implementation of JJM at Basanti Block under |
000008ORD/002448/2023-202 |
ORD/002448/2023-2024 |
1514/AD |
15/03/2024 |
22.4 |
AUGMENTATION OF TILKUMAR PIPED WATER SUPPLY SCHEME, BLOCK-BASANTI UNDER ALIPORE DIVISION, PHE DTE (SM/18281) |
22.4 |
2942/AD |
12/07/2024 |
FAD/001106/2024 |
16/07/2024 |
FAD/001106/2024 |
22.4 |
49 |
Alipore Division |
000008BILL/00778/2024-202 |
BILL/00778/2024-2025 |
12/07/2024 |
M/S MODINA ENTERPRISE |
Laying distribution system, Functional Household Tap Connection (FHTC) to all households for Gopalnagar Uttar, Zone-I Water Supply Scheme, Block - Pathar Pratima for implementation of JJM under Kakdwip Sub-Division of Alipore Division, P.H.E. Dte. (Part |
000008ORD/001778/2022-202 |
ORD/001778/2022-2023 |
11502/AD |
15/02/2023 |
8.45 |
GOPALNAGAR UTTAR ZONE-I PIPED WATER SUPPLY SCHEME IN PATHAR PRATIMA BLOCK IN SOUTH 24 PARGANAS UNDER KAKDWIP SUB-DIVISION OF ALIPORE DIVISION, PHE DTE. (SM/15524) |
8.45 |
2952/AD |
12/07/2024 |
FAD/001106/2024 |
16/07/2024 |
FAD/001106/2024 |
8.45 |
50 |
Alipore Division |
000008BILL/00779/2024-202 |
BILL/00779/2024-2025 |
15/07/2024 |
SAMSUL ENTERPRISE |
Construction of 300 m³ capacity 20 M. staging height R.C.C. Over Head Water Reservoir, Laying distribution system & Providing FHTC etc of Ground Water Based Augmentation of Pathankhali (Zone- II) piped water supply scheme of Gosaba Block under Canning S |
000008ORD/000040/2023-202 |
ORD/000040/2023-2024 |
175/AD |
19/04/2023 |
112.94 |
Augmentation of Pathankhali PWSS Zone-II for Providing Functional Household Tap Connection (FHTC) Block - Gosaba (SM/15968) |
112.94 |
2969/AD |
15/07/2024 |
FAD/001125/2024 |
18/07/2024 |
FAD/001125/2024 |
112.94 |
51 |
Alipore Division |
000008BILL/00782/2024-202 |
BILL/00782/2024-2025 |
15/07/2024 |
JAYANTA KUMAR DEY |
Inter connection and rising main with supply of specials at PH-IV for each zone of Kalikatala (Zone - I and II) W/S Scheme, Block-Canning-II under Canning Sub-Division of Alipore Division, P.H.E. Dte. (2nd Call) |
000008ORD/000236/2023-202 |
ORD/000236/2023-2024 |
1324/AD |
07/07/2023 |
54.98 |
AUGMENTATION AND RETROFITTING OF KALIKATALA (ZONE-I & II) PIPED WATER SUPPLY SCHEME FOR PROVIDING FUNCTIONAL HOUSEHOLD TAP CONNECTION (FHTC) (SM/15472) |
54.98 |
2971/AD |
15/07/2024 |
FAD/001125/2024 |
18/07/2024 |
FAD/001125/2024 |
54.98 |
52 |
Alipore Division |
000008BILL/00783/2024-202 |
BILL/00783/2024-2025 |
15/07/2024 |
M/S PATH MAKERS |
Construction of OHR, Laying of Distribution System, Providing Functional Household Tap Connection of Augmentation Piped Water Supply Scheme for Basanti (Zone-I, II, IV, V & VI), Block-Basanti under Canning Sub-Division of Alipore Division, PHE Dte. [No of |
000008ORD/000349/2023-202 |
ORD/000349/2023-2024 |
1659/AD |
20/07/2023 |
304.13 |
AUGMENTATION & RETROFITTING OF BASANTI (ZONE-II) PWSS FOR PROVIDING FUNCTIONAL HOUSEHOLD TAP CONNECTION (FHTC) (SM/15959) |
39.74 |
2972/AD |
15/07/2024 |
FAD/001125/2024 |
18/07/2024 |
FAD/001125/2024 |
39.74 |
53 |
Alipore Division |
000008BILL/00789/2024-202 |
BILL/00789/2024-2025 |
16/07/2024 |
UNITED BUILDERS |
Construction of OHR (200 Cum), Laying of Distribution System, Providing Functional Household Tap Connection etc. of Ground Water based Augmentation Piped Water Supply Scheme for the KACHUKHALI, Block-Gosaba under Canning Sub-Division of Alipore Division, |
000008ORD/000630/2023-202 |
ORD/000630/2023-2024 |
2434/AD |
22/08/2023 |
209.99 |
AUGMENTATION OF KACHU KHALI PIPED WATER SUPPLY SCHEME, BLOCK-GOSABA,DISTRICT-SOUTH 24 PARGANAS (SM/18267) |
209.99 |
2978/AD |
16/07/2024 |
FAD/001146/2024 |
22/07/2024 |
FAD/001146/2024 |
209.99 |
54 |
Alipore Division |
000008BILL/00798/2024-202 |
BILL/00798/2024-2025 |
16/07/2024 |
SUPER CONSTRUCTION |
Inter connection and rising main with supply of specials of Augmentation of Harekrishnapur W/S Scheme, Block-Basanti under Canning Sub-Division of Alipore Division, P.H.E. Dte. (2nd Call) |
000008ORD/000238/2023-202 |
ORD/000238/2023-2024 |
1390/AD |
12/07/2023 |
10.55 |
AUGMENTATION SCHEME FOR HAREKRISHNAPUR PIPED WATER SUPPLY SCHEME UNDER ALIPORE DIVISION, PHE DTE, BLOCK - BASANTI (SM/18279) |
10.55 |
2979/AD |
16/07/2024 |
FAD/001146/2024 |
22/07/2024 |
FAD/001146/2024 |
10.55 |
55 |
Alipore Division |
000008BILL/00804/2024-202 |
BILL/00804/2024-2025 |
18/07/2024 |
M/S. S.S. ENTERPRISE |
Allied works for pile and pile cap portion regarding the Construction of 2 nos. 350 cum. Over Head Reservoir (OHR), (20 mtr. Staging Height) as per departmental design, drawing & specification including R.C.C. Bored pile & pile cap upto pedestal for Augme |
000008ORD/000621/2023-202 |
ORD/000621/2023-2024 |
2431/AD |
22/08/2023 |
47.59 |
AUGMENTATION OF GROUND WATER BASED BISHNUPUR (ZONE - I & II), PIPE WATER SUPPLY SCHEME Phase-B, UNDER ALIPORE DIVISION, BLOCK : SAGAR, DISTRICT : SOUTH 24 PARGANAS (SM/13117) |
47.59 |
2993/AD |
18/07/2024 |
FAD/001180/2024 |
22/07/2024 |
FAD/001180/2024 |
47.59 |
56 |
Alipore Division |
000008BILL/00805/2024-202 |
BILL/00805/2024-2025 |
18/07/2024 |
S. CHAKRABORTY AND CO. |
Sinking of 02 Nos. 250mm x 150mm dia. 360 mtr. deep Tubewell by D.R. Rig method using UPVC Pipe & Pre-packed Resin Bonded Gravel Filter at 1st and 2nd Tubewell Site of Madhabnagar (Zone-I) Water Supply Scheme, Block - Pathar Pratima for implementation o |
000008ORD/001780/2022-202 |
ORD/001780/2022-2023 |
11757/AD |
21/02/2023 |
16.89 |
MADHABNAGAR ZONE - I PIPED WATER SUPPLY SCHEME IN PATHAR PRATIMA BLOCK IN SOUTH 24 PARGANAS, WEST BENGAL UNDER JAL JEEVAN MISSION UNDER KAKDWIP SUB-DIVISION OF ALIPORE DIVISION, PHE DTE. (SM/15525) |
16.89 |
2994/AD |
18/07/2024 |
FAD/001180/2024 |
22/07/2024 |
FAD/001180/2024 |
16.89 |
57 |
Alipore Division |
000008BILL/00807/2024-202 |
BILL/00807/2024-2025 |
18/07/2024 |
MUNNA AGROTECH ENTERPRISE |
Sinking of 04 Nos. 250mm x 150mm dia. 360 mtr. deep Tubewell by D.R. Rig method using UPVC Pipe & Pre-packed Resin Bonded Gravel Filter for Augmentation of Paschim Surendranagar (Zone-I) (Part-I, II & III) W/S Scheme, Block - Pathar Pratima for implementa |
000008ORD/001275/2022-202 |
ORD/001275/2022-2023 |
9587/AD |
03/01/2023 |
35.89 |
AUGMENTATION OF GROUND WATER BASED PASCHIM SURENDRANAGAR (ZONE-I) (PART I, II & III) , PIPE WATER SUPPLY SCHEME Phase-B, UNDER ALIPORE DIVISION, BLOCK : PATHARPRATIMA, DISTRICT : SOUTH 24 PARGANAS (SM/14124) |
35.89 |
2994/AD |
18/07/2024 |
FAD/001180/2024 |
22/07/2024 |
FAD/001180/2024 |
35.89 |
58 |
Alipore Division |
000008BILL/00808/2024-202 |
BILL/00808/2024-2025 |
18/07/2024 |
SUKUMAR HALDAR |
Construction of boundary wall along with Land Development, Plinth Protection and Approach Road for Pump House at 2nd Tubewell Site of Bamanagar W/S scheme, Block : Kakdwip under JJM of Kakdwip Sub-Division under Alipore Division, P.H.E. Dte. |
000008ORD/001157/2023-202 |
ORD/001157/2023-2024 |
3720/AD |
03/11/2023 |
9.54 |
GROUND WATER BASED BAMANAGAR PIPE WATER SUPPLY SCHEME UNDER ALIPORE DIVISION, BLOCK : KAKDWIP, DISTRICT : SOUTH 24 PARGANAS (SM/12733) |
9.54 |
2994/AD |
18/07/2024 |
FAD/001180/2024 |
22/07/2024 |
FAD/001180/2024 |
9.54 |
59 |
Alipore Division |
000008BILL/00809/2024-202 |
BILL/00809/2024-2025 |
18/07/2024 |
ANANTA KUMAR GIRI |
Supply, Delivery & Laying of Specials Required for Laying Rising Main and Inter-Connection Line between Tubewells and other allied works for providing FHTC under JJM at Sitarampur Water Supply Scheme, Block - Pathar Pratima under Kakdwip Sub-Division of A |
000008ORD/000224/2022-202 |
ORD/000224/2022-2023 |
3065/AD |
13/07/2022 |
0.57 |
Retrofitting of Distribution System for Providing Functional Household Tap Connection FHTC to the households for 12 twelve nos. habitation of all the households in connection with Jal Jeevan Mission JJM and Jal Swapna for Sitarampur WS Scheme including on (SM/08630) |
0.57 |
2994/AD |
18/07/2024 |
FAD/001180/2024 |
22/07/2024 |
FAD/001180/2024 |
0.57 |
60 |
Alipore Division |
000008BILL/00810/2024-202 |
BILL/00810/2024-2025 |
18/07/2024 |
ANANTA KUMAR GIRI |
Supplying, fitting, fixing and delivery of different dia. specials for Buraburirtat W/S Scheme under JJM, Block- Pathar Pratima under Kakdwip Sub-Division of Alipore Division, P.H.E. Dte. |
000008ORD/000721/2023-202 |
ORD/000721/2023-2024 |
2538/AD |
28/08/2023 |
3.26 |
GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR BURABURIR TAT , UNDER ALIPORE DIVISION, BLOCK : PATHARPRATIMA, DISTRICT : SOUTH 24 PARGANAS (SM/13801) |
3.26 |
2994/AD |
18/07/2024 |
FAD/001180/2024 |
22/07/2024 |
FAD/001180/2024 |
3.26 |
61 |
Alipore Division |
000008BILL/00811/2024-202 |
BILL/00811/2024-2025 |
18/07/2024 |
GOPAL KUMAR JHA |
Hiring of an Inspection Vehicle (Diesel Operated) for the use of Assistant Engineer, Diamond Harbour Sub-Division, of Alipore Division, P.H.E. Dte. for (period from 01/05/2024 to 31/10/2024) |
000008ORD/000006/2024-202 |
ORD/000006/2024-2025 |
48/DHSD |
30/04/2024 |
0.4 |
AUGMENTATION FOR PROVIDING FUNCTIONAL HOUSEHOLD TAP CONNECTION (FHTC) FROM DISTRIBUTION SYSTEM WITH ALLIED WORKS TO EXTEND THE BENEFIT OF 100% HOUSEHOLD AT ZONE-X OF DIAMOND HARBOUR-I BLOCK WITHIN ' MEGA SURFACE WATER BASED WATER SUPPLY SCHEME FOR FALTA - (SM/15322) |
0.4 |
2996/AD |
18/07/2024 |
FAD/001180/2024 |
22/07/2024 |
FAD/001180/2024 |
0.4 |
62 |
Alipore Division |
000008BILL/00812/2024-202 |
BILL/00812/2024-2025 |
18/07/2024 |
GOPAL KUMAR JHA |
Hiring of an Inspection Vehicle (Diesel Operated) for the use of Assistant Engineer, Diamond Harbour Sub-Division,
of Alipore Division, P.H.E. Dte. for (period from 01/11/2023 to 30/04/2024)
|
000008ORD/001188/2023-202 |
ORD/001188/2023-2024 |
555/DHSD |
31/10/2023 |
0.4 |
Retrofitting of Distribution system of Zone IX Falta Block for Providing Functional Household Tap Connection (FHTC) to all the households in connection with Jal Jeevan Mission & Jal Swapna under Mega Surface Water Based Water Supply Scheme for Falta-Mathu (SM/08123) |
0.4 |
2996/AD |
18/07/2024 |
FAD/001180/2024 |
22/07/2024 |
FAD/001180/2024 |
0.4 |
63 |
Alipore Division |
000008BILL/01907/2023-202 |
BILL/01907/2023-2024 |
17/10/2023 |
RAJKUMAR MANNA |
Hiring of Motor Launch for Kakdwip Sub Division of Alipore Division, PHE Dte. (01.06.2022 to 31.08.2022) |
000008 |
|
698/KSD |
26/11/2021 |
6.51 |
Retrofitting of distribution system for Providing Functional Household Tap Connection (FHTC) to all the households for 10 (Ten) nos. habitation in connection with Jal Jeevan Mission (JJM) and Jal Swapna for Bishnupur Water Supply Scheme including one yea (SM/09358) |
6.51 |
3527/AD |
17/10/2023 |
FAD/002346/2023 |
18/10/2023 |
2726/DPHE-12/38 |
6.51 |