| 1 |
Alipurduar Division |
ALIPURDUAR |
|
Procurement of Chemicals & Consumables, Glassware for Laboratories, Consumables for OMAS, OMAS Kit & Annual Maintenance contract of Computer, Printer, UPS & other peripherals for Laboratories. ,SM/06623 |
Support |
|
|
|
05/02/2020 |
23/06/2021 |
31/03/2024 |
29/01/2024 |
6 |
0 |
21.16 |
21.03 |
99 |
99 |
| 2 |
Alipurduar Division |
ALIPURDUAR |
Falakata |
F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Jateswar Water Supply Scheme (Phase-1),SM/07057 |
Retrofitting |
Birpara Sub-Division |
Birpara A.E |
RWS Falakata Block |
25/11/2020 |
01/12/2020 |
31/05/2025 |
29/12/2025 |
14 |
2,066 |
99.09 |
139.80 |
90 |
141 |
| 3 |
Alipurduar Division |
ALIPURDUAR |
Alipurduar - II |
F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Bakla Piped Water Supply Scheme (Phase-2),SM/07058 |
Retrofitting |
Alipurduar Sadar Sub-Division |
Alipurduar Sadar Sub Division |
RWS Alipurduar - II Block |
25/11/2020 |
01/12/2020 |
31/05/2025 |
29/12/2025 |
6 |
1,036 |
82.69 |
78.69 |
90 |
95 |
| 4 |
Alipurduar Division |
ALIPURDUAR |
Falakata |
F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Chotosalkumar Piped Water Supply Scheme (Phase-1),SM/07059 |
Retrofitting |
Birpara Sub-Division |
Birpara A.E |
RWS Falakata Block |
25/11/2020 |
17/03/2015 |
31/05/2025 |
29/12/2025 |
11 |
967 |
97.58 |
145.80 |
90 |
149 |
| 5 |
Alipurduar Division |
ALIPURDUAR |
Alipurduar - I |
F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Patlakhawa Piped Water Supply Scheme (Phase-1),SM/07060 |
Retrofitting |
Birpara Sub-Division |
Alipurduar RWS |
Birpara Sub Division |
25/11/2020 |
01/12/2020 |
31/07/2025 |
29/12/2025 |
9 |
1,400 |
86.77 |
171.88 |
90 |
198 |
| 6 |
Alipurduar Division |
ALIPURDUAR |
Alipurduar - I |
F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Patlakhawa Piped Water Supply Scheme (Phase-2),SM/07061 |
Retrofitting |
Birpara Sub-Division |
Alipurduar RWS |
Birpara Sub Division |
25/11/2020 |
01/12/2020 |
31/07/2025 |
29/12/2025 |
7 |
1,581 |
93.85 |
119.46 |
55 |
127 |
| 7 |
Alipurduar Division |
ALIPURDUAR |
Kumargram |
F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Uttar Kamakshyaguri Piped Water Supply Scheme (Phase-1),SM/07062 |
Retrofitting |
Alipurduar Sadar Sub-Division |
Alipurduar Sadar Sub Division |
Alipurduar Sub Division |
25/11/2020 |
25/12/2020 |
31/05/2025 |
29/12/2025 |
10 |
2,826 |
87.86 |
94.91 |
95 |
108 |
| 8 |
Alipurduar Division |
ALIPURDUAR |
Alipurduar - II |
F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Salsalabari Piped Water Supply Scheme (Phase-2),SM/07063 |
Retrofitting |
Alipurduar Sadar Sub-Division |
Alipurduar Sadar Sub Division |
RWS Alipurduar - II Block |
25/11/2020 |
01/12/2020 |
31/05/2025 |
29/12/2025 |
8 |
1,709 |
91.90 |
102.20 |
95 |
111 |
| 9 |
Alipurduar Division |
ALIPURDUAR |
Madarihat |
F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Hantupara Tea Garden Piped Water Supply Scheme,SM/07064 |
Retrofitting |
Birpara Sub-Division |
Birpara A.E |
Birpara Sub Division |
25/11/2020 |
11/07/2017 |
31/05/2025 |
29/12/2025 |
9 |
1,612 |
99.04 |
178.48 |
90 |
180 |
| 10 |
Alipurduar Division |
ALIPURDUAR |
Kumargram |
F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Kaijali Basty Piped Water Supply Scheme (Phase-2),SM/07065 |
Retrofitting |
Alipurduar Sadar Sub-Division |
Alipurduar Sadar Sub Division |
RWS Alipurduar - II Block |
25/11/2020 |
01/12/2020 |
31/05/2025 |
29/12/2025 |
7 |
596 |
73.85 |
34.11 |
90 |
46 |
| 11 |
Alipurduar Division |
ALIPURDUAR |
Madarihat |
F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Lankapara Water Supply Scheme (Phase-2),SM/07066 |
Retrofitting |
Birpara Sub-Division |
Birpara A.E |
Birpara Sub Division |
25/11/2020 |
01/12/2020 |
31/05/2025 |
29/12/2025 |
10 |
2,682 |
80.75 |
78.08 |
90 |
97 |
| 12 |
Alipurduar Division |
ALIPURDUAR |
Kalchini |
F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Radharani T.G Water Supply Scheme (Phase-1),SM/07067 |
Retrofitting |
Alipurduar Division |
HQ-A.E |
RWS Kalchini Block |
25/11/2020 |
05/01/2021 |
31/05/2025 |
29/12/2025 |
10 |
345 |
98.86 |
98.86 |
95 |
100 |
| 13 |
Alipurduar Division |
ALIPURDUAR |
Madarihat |
F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Dimdima T.G Water Supply Scheme (Phase-1),SM/07068 |
Retrofitting |
Alipurduar Sadar Sub-Division |
Birpara A.E |
Alipurduar Sub Division |
25/11/2020 |
05/01/2021 |
31/05/2025 |
29/12/2025 |
8 |
1,509 |
85.62 |
78.16 |
90 |
91 |
| 14 |
Alipurduar Division |
ALIPURDUAR |
Madarihat |
F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Dimdima T.G Water Supply Scheme (Phase-2),SM/07069 |
Retrofitting |
Alipurduar Sadar Sub-Division |
Birpara A.E |
Alipurduar Sub Division |
25/11/2020 |
05/01/2021 |
31/05/2025 |
29/12/2025 |
5 |
1,509 |
61.34 |
61.33 |
90 |
100 |
| 15 |
Alipurduar Division |
ALIPURDUAR |
Alipurduar - I |
F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Birpara (APD) Piped Water Supply Scheme (Phase-2),SM/07121 |
Retrofitting |
Birpara Sub-Division |
Alipurduar RWS |
Birpara Sub Division |
26/11/2020 |
07/12/2020 |
31/05/2025 |
29/12/2025 |
7 |
2,686 |
82.27 |
79.34 |
90 |
96 |
| 16 |
Alipurduar Division |
ALIPURDUAR |
Kumargram |
F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Barobisa Piped Water Supply Scheme (Zone-III, Phase-2),SM/07122 |
Retrofitting |
Alipurduar Sadar Sub-Division |
Alipurduar Sadar Sub Division |
Alipurduar Sub Division |
26/11/2020 |
01/12/2020 |
31/05/2025 |
29/12/2025 |
5 |
1,623 |
98.68 |
98.68 |
95 |
100 |
| 17 |
Alipurduar Division |
ALIPURDUAR |
Kumargram |
F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Barobisa Piped Water Supply Scheme (Zone-III, Phase-1),SM/07123 |
Retrofitting |
Alipurduar Sadar Sub-Division |
Alipurduar Sadar Sub Division |
Alipurduar Sub Division |
26/11/2020 |
01/12/2020 |
31/05/2025 |
29/12/2025 |
10 |
1,051 |
98.96 |
112.42 |
95 |
114 |
| 18 |
Alipurduar Division |
ALIPURDUAR |
Alipurduar - II |
F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Purba Chenpani Piped Water Supply Scheme (Phase-2),SM/07124 |
Retrofitting |
Alipurduar Sadar Sub-Division |
Alipurduar Sadar Sub Division |
Alipurduar Sub Division |
26/11/2020 |
25/12/2020 |
31/05/2025 |
29/12/2025 |
3 |
1,477 |
55.28 |
47.81 |
95 |
86 |
| 19 |
Alipurduar Division |
ALIPURDUAR |
Kumargram |
F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Barobisa Piped Water Supply Scheme (Zone-II, Phase-2),SM/07125 |
Retrofitting |
Alipurduar Sadar Sub-Division |
Alipurduar Sadar Sub Division |
Alipurduar Sub Division |
26/11/2020 |
01/12/2020 |
31/05/2025 |
29/12/2025 |
5 |
1,051 |
90.17 |
90.17 |
95 |
100 |
| 20 |
Alipurduar Division |
ALIPURDUAR |
Kumargram |
F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Barobisa Piped Water Supply Scheme (Zone-II, Phase-1),SM/07126 |
Retrofitting |
Alipurduar Sadar Sub-Division |
Alipurduar Sadar Sub Division |
Alipurduar Sub Division |
26/11/2020 |
01/12/2020 |
31/05/2025 |
29/12/2025 |
6 |
1,051 |
93.00 |
171.91 |
95 |
185 |
| 21 |
Alipurduar Division |
ALIPURDUAR |
Kumargram |
F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Barobisa Piped Water Supply Scheme (Zone-I, Phase-2),SM/07127 |
Retrofitting |
Alipurduar Sadar Sub-Division |
Alipurduar Sadar Sub Division |
Alipurduar Sub Division |
26/11/2020 |
01/12/2020 |
31/05/2025 |
29/12/2025 |
8 |
1,051 |
66.37 |
71.36 |
95 |
108 |
| 22 |
Alipurduar Division |
ALIPURDUAR |
Alipurduar - I |
F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Tapshikatha Piped Water Supply Scheme (Phase-2),SM/07128 |
Retrofitting |
Birpara Sub-Division |
Alipurduar RWS |
Birpara Sub Division |
26/11/2020 |
25/12/2020 |
31/07/2025 |
29/12/2025 |
8 |
895 |
62.07 |
62.07 |
61 |
100 |
| 23 |
Alipurduar Division |
ALIPURDUAR |
Falakata |
F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Jagijhora Barabak Piped Water Supply Scheme ,SM/07129 |
Retrofitting |
Birpara Sub-Division |
Birpara A.E |
RWS Falakata Block |
26/11/2020 |
01/12/2020 |
31/05/2025 |
29/12/2025 |
6 |
1,328 |
72.16 |
116.02 |
90 |
161 |
| 24 |
Alipurduar Division |
ALIPURDUAR |
Madarihat |
FHTC under Jaldhara / Jalswapna including retrofitting of existing distribution system under DHUMCHIPARA T.G. Piped Water Supply Scheme,SM/07130 |
Retrofitting |
Birpara Sub-Division |
Birpara A.E |
Birpara Sub Division |
26/11/2020 |
01/12/2020 |
30/06/2025 |
29/12/2025 |
9 |
1,568 |
94.15 |
95.72 |
60 |
102 |
| 25 |
Alipurduar Division |
ALIPURDUAR |
Madarihat |
FHTC under Jaldhara / Jalswapna including retrofitting of existing distribution system under DHEKLAPARA T.G. Piped Water Supply Scheme,SM/07131 |
Retrofitting |
Birpara Sub-Division |
Birpara A.E |
Birpara Sub Division |
26/11/2020 |
13/07/2017 |
30/09/2022 |
29/12/2025 |
7 |
567 |
73.16 |
107.51 |
10 |
147 |
| 26 |
Alipurduar Division |
ALIPURDUAR |
Madarihat |
FHTC under Jaldhara / Jalswapna including retrofitting of existing distribution system under DALMORE RAMJHORA T.G. Piped Water Supply Scheme (Phase-2),SM/07132 |
Retrofitting |
Birpara Sub-Division |
Birpara A.E |
Birpara Sub Division |
26/11/2020 |
01/12/2020 |
30/09/2025 |
29/12/2025 |
6 |
1,847 |
88.70 |
18.55 |
50 |
21 |
| 27 |
Alipurduar Division |
ALIPURDUAR |
Madarihat |
FHTC under Jaldhara / Jalswapna including retrofitting of existing distribution system under DALMORE RAMJHORA T.G. Piped Water Supply Scheme (Phase-1),SM/07133 |
Retrofitting |
Birpara Sub-Division |
Birpara A.E |
Birpara Sub Division |
26/11/2020 |
01/12/2020 |
31/05/2025 |
29/12/2025 |
9 |
1,169 |
95.65 |
148.59 |
88 |
155 |
| 28 |
Alipurduar Division |
ALIPURDUAR |
Alipurduar - II |
F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Purba Chenpani Piped Water Supply Scheme (Phase-1),SM/07134 |
Retrofitting |
Alipurduar Sadar Sub-Division |
Alipurduar Sadar Sub Division |
Alipurduar Sub Division |
26/11/2020 |
25/12/2020 |
31/05/2025 |
29/12/2025 |
4 |
1,477 |
89.44 |
100.64 |
95 |
113 |
| 29 |
Alipurduar Division |
ALIPURDUAR |
Madarihat |
F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Paschim Khairbari Piped Water Supply Scheme (Phase-1) ,SM/07135 |
Retrofitting |
Birpara Sub-Division |
Birpara A.E |
Birpara Sub Division |
26/11/2020 |
25/12/2020 |
31/05/2025 |
29/12/2025 |
6 |
822 |
87.03 |
109.44 |
95 |
126 |
| 30 |
Alipurduar Division |
ALIPURDUAR |
Madarihat |
F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Paschim Khairbari Piped Water Supply Scheme (Phase-2) ,SM/07136 |
Retrofitting |
Birpara Sub-Division |
Birpara A.E |
Birpara Sub Division |
26/11/2020 |
25/12/2020 |
30/06/2025 |
29/12/2025 |
5 |
822 |
80.05 |
67.16 |
80 |
84 |
| 31 |
Alipurduar Division |
ALIPURDUAR |
Falakata |
F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Dalimpur Piped Water Supply Scheme (Phase-1) ,SM/07137 |
Retrofitting |
Birpara Sub-Division |
Birpara A.E |
RWS Falakata Block |
26/11/2020 |
01/12/2020 |
31/07/2025 |
29/12/2025 |
10 |
1,073 |
97.16 |
153.05 |
90 |
158 |
| 32 |
Alipurduar Division |
ALIPURDUAR |
Madarihat |
F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Lankapara Piped Water Supply Scheme (Phase-1) ,SM/07138 |
Retrofitting |
Birpara Sub-Division |
Birpara A.E |
Birpara Sub Division |
26/11/2020 |
01/12/2020 |
31/05/2025 |
29/12/2025 |
8 |
2,682 |
96.46 |
154.63 |
90 |
160 |
| 33 |
Alipurduar Division |
ALIPURDUAR |
Alipurduar - II |
F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Bakla Piped Water Supply Scheme (Phase-1),SM/07174 |
Retrofitting |
Alipurduar Sadar Sub-Division |
Alipurduar Sadar Sub Division |
RWS Alipurduar - II Block |
04/12/2020 |
25/12/2020 |
31/05/2025 |
29/12/2025 |
6 |
1,388 |
76.33 |
108.45 |
90 |
142 |
| 34 |
Alipurduar Division |
ALIPURDUAR |
Alipurduar - I |
F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Birpara (APD) Piped Water Supply Scheme (Phase-1),SM/07175 |
Retrofitting |
Birpara Sub-Division |
Alipurduar RWS |
Birpara Sub Division |
04/12/2020 |
07/12/2020 |
31/05/2025 |
29/12/2025 |
10 |
2,686 |
91.69 |
94.13 |
90 |
103 |
| 35 |
Alipurduar Division |
ALIPURDUAR |
Falakata |
F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Chotosalkumar Piped Water Supply Scheme (Phase-2),SM/07176 |
Retrofitting |
Birpara Sub-Division |
Birpara A.E |
RWS Falakata Block |
04/12/2020 |
17/03/2015 |
31/05/2025 |
29/12/2025 |
14 |
1,621 |
70.54 |
56.80 |
90 |
81 |
| 36 |
Alipurduar Division |
ALIPURDUAR |
Alipurduar - II |
F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Salsalabari Piped Water Supply Scheme (Phase-1),SM/07177 |
Retrofitting |
Alipurduar Sadar Sub-Division |
Alipurduar Sadar Sub Division |
RWS Alipurduar - II Block |
04/12/2020 |
25/12/2020 |
31/05/2025 |
29/12/2025 |
8 |
761 |
68.96 |
132.18 |
95 |
192 |
| 37 |
Alipurduar Division |
ALIPURDUAR |
Alipurduar - I |
F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Munshipara Piped Water Supply Scheme (Phase-1),SM/07178 |
Retrofitting |
Birpara Sub-Division |
Alipurduar RWS |
Birpara Sub Division |
04/12/2020 |
25/12/2020 |
31/05/2025 |
29/12/2025 |
10 |
1,419 |
98.08 |
138.02 |
95 |
141 |
| 38 |
Alipurduar Division |
ALIPURDUAR |
Alipurduar - I |
F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Munshipara Piped Water Supply Scheme (Phase-2),SM/07179 |
Retrofitting |
Birpara Sub-Division |
Alipurduar RWS |
Birpara Sub Division |
04/12/2020 |
25/12/2020 |
30/06/2025 |
29/12/2025 |
7 |
1,419 |
69.14 |
42.69 |
95 |
62 |
| 39 |
Alipurduar Division |
ALIPURDUAR |
Madarihat |
F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Totopara Piped Water Supply Scheme,SM/07180 |
Retrofitting |
Birpara Sub-Division |
Birpara A.E |
RWS Madarihat - Birpara Block |
04/12/2020 |
25/12/2020 |
31/05/2025 |
29/12/2025 |
6 |
624 |
64.83 |
17.16 |
42 |
26 |
| 40 |
Alipurduar Division |
ALIPURDUAR |
Kumargram |
F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Kaijali Basty Piped Water Supply Scheme (Phase-1),SM/07181 |
Retrofitting |
Alipurduar Sadar Sub-Division |
Alipurduar Sadar Sub Division |
Alipurduar Sub Division |
04/12/2020 |
25/12/2020 |
31/05/2025 |
29/12/2025 |
6 |
571 |
89.66 |
91.47 |
90 |
102 |
| 41 |
Alipurduar Division |
ALIPURDUAR |
Alipurduar - II |
F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Loknathpur and Amp Adj. Mouza Piped Water Supply Scheme (Phase-1),SM/07182 |
Retrofitting |
Alipurduar Sadar Sub-Division |
Alipurduar Sadar Sub Division |
RWS Alipurduar - II Block |
04/12/2020 |
25/12/2020 |
31/05/2025 |
29/12/2025 |
5 |
870 |
98.81 |
160.38 |
90 |
162 |
| 42 |
Alipurduar Division |
ALIPURDUAR |
Alipurduar - II |
F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Loknathpur and Amp Adj. Mouza Piped Water Supply Scheme (Phase-2),SM/07183 |
Retrofitting |
Alipurduar Sadar Sub-Division |
Alipurduar Sadar Sub Division |
RWS Alipurduar - II Block |
04/12/2020 |
25/12/2020 |
31/05/2025 |
29/12/2025 |
3 |
870 |
56.02 |
53.47 |
90 |
95 |
| 43 |
Alipurduar Division |
ALIPURDUAR |
Alipurduar - II |
F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Jashodanga Piped Water Supply Scheme,SM/07184 |
Retrofitting |
Alipurduar Sadar Sub-Division |
Alipurduar Sadar Sub Division |
RWS Alipurduar - II Block |
04/12/2020 |
25/12/2020 |
31/05/2025 |
29/12/2025 |
6 |
901 |
82.41 |
107.49 |
95 |
130 |
| 44 |
Alipurduar Division |
ALIPURDUAR |
Kumargram |
F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Barobisa Piped Water Supply Scheme (Zone-1,Phase-1),SM/07185 |
Retrofitting |
Alipurduar Sadar Sub-Division |
Alipurduar Sadar Sub Division |
Alipurduar Sub Division |
04/12/2020 |
25/12/2020 |
31/05/2025 |
29/12/2025 |
10 |
1,623 |
82.87 |
146.19 |
95 |
176 |
| 45 |
Alipurduar Division |
ALIPURDUAR |
Kalchini |
F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Radharani T.G Piped Water Supply Scheme (Phase-2),SM/07186 |
Retrofitting |
Alipurduar Division |
HQ-A.E |
RWS Kalchini Block |
04/12/2020 |
05/01/2021 |
31/05/2025 |
29/12/2025 |
14 |
345 |
99.29 |
81.62 |
95 |
82 |
| 46 |
Alipurduar Division |
ALIPURDUAR |
Alipurduar - I |
F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Banchukamari Piped Water Supply Scheme (Phase-1),SM/07187 |
Retrofitting |
Birpara Sub-Division |
Alipurduar RWS |
Birpara Sub Division |
04/12/2020 |
25/12/2020 |
31/07/2025 |
29/12/2025 |
9 |
828 |
73.94 |
137.85 |
72 |
186 |
| 47 |
Alipurduar Division |
ALIPURDUAR |
Alipurduar - I |
F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Banchukamari Piped Water Supply Scheme (Phase-2),SM/07188 |
Retrofitting |
Birpara Sub-Division |
Alipurduar RWS |
Birpara Sub Division |
04/12/2020 |
25/12/2020 |
31/05/2025 |
29/12/2025 |
4 |
828 |
73.94 |
54.01 |
78 |
73 |
| 48 |
Alipurduar Division |
ALIPURDUAR |
Alipurduar - I |
F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Tapshikhata Piped Water Supply Scheme (Phase-1),SM/07189 |
Retrofitting |
Birpara Sub-Division |
Alipurduar RWS |
Birpara Sub Division |
04/12/2020 |
25/12/2020 |
30/06/2025 |
29/12/2025 |
11 |
895 |
97.67 |
154.45 |
81 |
158 |
| 49 |
Alipurduar Division |
ALIPURDUAR |
Alipurduar - I |
F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Paitkapara T.G Piped Water Supply Scheme,SM/07190 |
Retrofitting |
Birpara Sub-Division |
Alipurduar RWS |
Birpara Sub Division |
04/12/2020 |
20/01/2016 |
31/05/2025 |
29/12/2025 |
8 |
1,026 |
83.82 |
135.42 |
95 |
162 |
| 50 |
Alipurduar Division |
ALIPURDUAR |
Kalchini |
F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Jayanti Piped Water Supply Scheme,SM/07193 |
Retrofitting |
Birpara Sub-Division |
HQ-A.E |
Birpara Sub Division |
04/12/2020 |
25/12/2020 |
31/05/2025 |
29/12/2025 |
6 |
608 |
60.86 |
71.17 |
95 |
117 |
| 51 |
Alipurduar Division |
ALIPURDUAR |
Kumargram |
F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Jayanti T.G Piped Water Supply Scheme,SM/07195 |
Retrofitting |
Alipurduar Sadar Sub-Division |
Alipurduar Sadar Sub Division |
Alipurduar Sub Division |
04/12/2020 |
25/12/2020 |
31/05/2025 |
29/12/2025 |
4 |
1,222 |
98.84 |
155.05 |
90 |
157 |
| 52 |
Alipurduar Division |
ALIPURDUAR |
Kumargram |
F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Rahimabad T.G Piped Water Supply Scheme,SM/07196 |
Retrofitting |
Alipurduar Sadar Sub-Division |
Alipurduar Sadar Sub Division |
Alipurduar Sub Division |
04/12/2020 |
10/01/2018 |
30/11/2025 |
29/12/2025 |
4 |
803 |
67.24 |
100.83 |
90 |
150 |
| 53 |
Alipurduar Division |
ALIPURDUAR |
Madarihat |
F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Gargenda T.G Piped Water Supply Scheme,SM/07197 |
Retrofitting |
Birpara Sub-Division |
Birpara A.E |
Birpara Sub Division |
04/12/2020 |
25/12/2020 |
31/05/2025 |
29/12/2025 |
8 |
1,121 |
84.07 |
74.98 |
80 |
89 |
| 54 |
Alipurduar Division |
ALIPURDUAR |
Madarihat |
F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Mujnai T.G Piped Water Supply Scheme,SM/07198 |
Retrofitting |
Birpara Sub-Division |
Birpara A.E |
Birpara Sub Division |
04/12/2020 |
19/07/2014 |
31/05/2025 |
29/12/2025 |
8 |
882 |
69.04 |
70.69 |
90 |
102 |
| 55 |
Alipurduar Division |
ALIPURDUAR |
Madarihat |
F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Makrapara T.G Piped Water Supply Scheme,SM/07199 |
Retrofitting |
Birpara Sub-Division |
Birpara A.E |
Birpara Sub Division |
04/12/2020 |
25/12/2020 |
31/05/2025 |
29/12/2025 |
8 |
688 |
61.63 |
60.56 |
90 |
98 |
| 56 |
Alipurduar Division |
ALIPURDUAR |
Kalchini |
FHTC under Jaldhara/Jal Sapna including retrofitting of existing distribution system under the command area of Jaigaon & Falakata water supply scheme. ,SM/08080 |
Retrofitting |
Alipurduar Division |
HQ-A.E |
RWS Kalchini Block |
04/02/2021 |
18/11/2016 |
31/07/2025 |
29/12/2025 |
74 |
29,206 |
1,224.31 |
1,160.54 |
86 |
95 |
| 57 |
Alipurduar Division |
ALIPURDUAR |
Madarihat |
Supply of potable drinking water to Mujnai Tea Garden in relation with Chaa Sundari Project. ,SM/08580 |
New |
Birpara Sub-Division |
Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte.,Birpara A.E |
Birpara Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) |
10/02/2021 |
25/02/2021 |
31/08/2025 |
29/12/2025 |
12 |
882 |
295.97 |
210.94 |
90 |
71 |
| 58 |
Alipurduar Division |
ALIPURDUAR |
Madarihat |
FHTC under Jaldhara Jalswapna Including Retrofitting of existing distribution system under the command area of UTTAR MADARIHAT Water Supply Scheme,SM/08880 |
Retrofitting |
Alipurduar Sadar Sub-Division |
Birpara A.E |
Alipurduar Sub Division |
27/09/2021 |
04/10/2021 |
31/05/2025 |
29/12/2025 |
9 |
2,328 |
140.24 |
140.24 |
90 |
100 |
| 59 |
Alipurduar Division |
ALIPURDUAR |
Madarihat |
FHTC under Jaldhara Jalswapna Including Retrofitting of existing distribution system under the command area of UTTAR SISHUBARI Water Supply Scheme,SM/08881 |
Retrofitting |
Birpara Sub-Division |
Birpara A.E |
Birpara Sub Division |
27/09/2021 |
04/10/2021 |
30/06/2025 |
29/12/2025 |
7 |
874 |
184.32 |
131.69 |
90 |
71 |
| 60 |
Alipurduar Division |
ALIPURDUAR |
Alipurduar - II |
FHTC under Jaldhara Jalswapna Including Retrofitting of existing distribution system under the command area of CHANDIRJHAR Water Supply Scheme,SM/08882 |
Retrofitting |
Alipurduar Sadar Sub-Division |
Alipurduar Sadar Sub Division |
Alipurduar Sub Division |
27/09/2021 |
04/10/2021 |
31/05/2025 |
29/12/2025 |
7 |
1,096 |
129.45 |
128.72 |
90 |
99 |
| 61 |
Alipurduar Division |
ALIPURDUAR |
Alipurduar - I |
FHTC under Jaldhara Jalswapna Including Retrofitting of existing distribution system under the command area of SALKUMARHAT Water Supply Scheme,SM/08883 |
Retrofitting |
Birpara Sub-Division |
Alipurduar RWS |
Birpara Sub Division |
27/09/2021 |
04/10/2021 |
31/05/2025 |
29/12/2025 |
7 |
1,393 |
87.85 |
82.80 |
90 |
94 |
| 62 |
Alipurduar Division |
ALIPURDUAR |
Kalchini |
FHTC under Jaldhara Jalswapna Including Retrofitting of existing distribution system under the command area of HASIMARA Water Supply Scheme,SM/08884 |
Retrofitting |
Alipurduar Division |
HQ-A.E |
RWS Kalchini Block |
27/09/2021 |
04/10/2021 |
30/06/2025 |
29/12/2025 |
17 |
2,599 |
398.83 |
387.18 |
81 |
97 |
| 63 |
Alipurduar Division |
ALIPURDUAR |
Alipurduar - I |
AUGMENTATION OF BHOLARDABRI PIPE WATER SUPPLY SCHEME,SM/09883 |
Augmentation |
Alipurduar Sadar Sub-Division |
Alipurduar RWS,Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte. |
Alipurduar Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) |
08/12/2021 |
11/01/2022 |
31/07/2025 |
29/12/2025 |
29 |
6,045 |
451.23 |
303.10 |
78 |
67 |
| 64 |
Alipurduar Division |
ALIPURDUAR |
Alipurduar - II |
AUGMENTATION OF PUTIMARI PIPED WATER SUPPLY SCHEME,SM/09884 |
Augmentation |
Alipurduar Sadar Sub-Division |
Alipurduar Sadar Sub Division,Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte. |
Alipurduar Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) |
08/12/2021 |
11/01/2022 |
30/06/2025 |
29/12/2025 |
24 |
2,333 |
484.93 |
463.25 |
85 |
96 |
| 65 |
Alipurduar Division |
ALIPURDUAR |
Falakata |
AUGMENTATION OF BHUTNIRGHAT PIPED WATER SUPPLY SCHEME,SM/09885 |
Augmentation |
Alipurduar Sadar Sub-Division |
Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte.,Birpara A.E |
Alipurduar Sub Division,Junior Engineer 2, Cooch-Behar Mechanical Sub-Division, PHE Dte.(Gourab Mallick) |
08/12/2021 |
11/01/2022 |
30/06/2025 |
29/12/2025 |
19 |
3,226 |
449.91 |
443.61 |
90 |
99 |
| 66 |
Alipurduar Division |
ALIPURDUAR |
Alipurduar - II |
REJUVENATION OF MADHYA PAROKATA PIPED WATER SUPPLY SCHEME,SM/09886 |
Augmentation |
Alipurduar Sadar Sub-Division |
Alipurduar Sadar Sub Division,Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte. |
Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda),RWS Alipurduar - II Block |
08/12/2021 |
11/01/2022 |
31/05/2025 |
29/12/2025 |
8 |
2,202 |
257.81 |
244.39 |
95 |
95 |
| 67 |
Alipurduar Division |
ALIPURDUAR |
Alipurduar - II |
REJUVINATION OF 'DHAOLAJHORA .T.G WATER SUPPLY SCHEME',SM/09888 |
Augmentation |
Alipurduar Sadar Sub-Division |
Alipurduar Sadar Sub Division,Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte. |
Alipurduar Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) |
08/12/2021 |
14/01/2022 |
31/05/2025 |
29/12/2025 |
4 |
0 |
43.87 |
29.08 |
95 |
66 |
| 68 |
Alipurduar Division |
ALIPURDUAR |
Alipurduar - II |
REJUVENATION OF 'BAKLA WATER SUPPLY SCHEME',SM/09890 |
Augmentation |
Alipurduar Sadar Sub-Division |
Alipurduar Sadar Sub Division,Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte. |
Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda),RWS Alipurduar - II Block |
08/12/2021 |
11/01/2022 |
30/06/2025 |
29/12/2025 |
3 |
0 |
45.21 |
20.92 |
98 |
46 |
| 69 |
Alipurduar Division |
ALIPURDUAR |
Alipurduar - I |
REJUVENATION OF BANCHUKAMARI WATER SUPPLY SCHEME,SM/09891 |
Augmentation |
Birpara Sub-Division |
Alipurduar RWS,Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte. |
Birpara Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) |
08/12/2021 |
11/01/2022 |
31/05/2025 |
29/12/2025 |
5 |
0 |
47.49 |
21.62 |
82 |
46 |
| 70 |
Alipurduar Division |
ALIPURDUAR |
Alipurduar - II |
REJUVINATION OF CHANDIRJHAR WATER SUPPLY SCHEME,SM/09892 |
Augmentation |
Alipurduar Sadar Sub-Division |
Alipurduar Sadar Sub Division,Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte. |
Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda),RWS Alipurduar - II Block |
08/12/2021 |
11/01/2022 |
31/05/2025 |
29/12/2025 |
9 |
0 |
47.49 |
32.83 |
98 |
69 |
| 71 |
Alipurduar Division |
ALIPURDUAR |
Alipurduar - II |
REJUVENATION OF 'PURBA CHEPANI WATER SUPPLY SCHEME',SM/09893 |
Augmentation |
Alipurduar Sadar Sub-Division |
Alipurduar Sadar Sub Division,Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte. |
Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda),RWS Alipurduar - II Block |
08/12/2021 |
23/03/2023 |
30/06/2025 |
29/12/2025 |
4 |
0 |
45.22 |
30.26 |
90 |
67 |
| 72 |
Alipurduar Division |
ALIPURDUAR |
Alipurduar - I |
REJUVENATION OF MUNSHIPARA WATER SUPPLY SCHEME,SM/09894 |
Augmentation |
Birpara Sub-Division |
Alipurduar RWS,Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte. |
Birpara Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) |
08/12/2021 |
14/01/2022 |
30/06/2025 |
29/12/2025 |
5 |
0 |
44.01 |
27.25 |
85 |
62 |
| 73 |
Alipurduar Division |
ALIPURDUAR |
Madarihat |
Rejuvenation of Makrapara TG WSS.,SM/09895 |
Augmentation |
Alipurduar Sadar Sub-Division |
Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte.,Birpara A.E |
Alipurduar Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) |
08/12/2021 |
31/01/2022 |
31/05/2025 |
29/12/2025 |
6 |
0 |
45.22 |
42.81 |
90 |
95 |
| 74 |
Alipurduar Division |
ALIPURDUAR |
Madarihat |
REJUVENATION OF DHUMCHIPARA. T.G. WATER SUPPLY SCHEME,SM/09896 |
Augmentation |
Alipurduar Sadar Sub-Division |
Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte.,Birpara A.E |
Alipurduar Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) |
08/12/2021 |
31/01/2022 |
30/06/2025 |
29/12/2025 |
8 |
0 |
45.23 |
29.82 |
93 |
66 |
| 75 |
Alipurduar Division |
ALIPURDUAR |
Alipurduar - I |
REJUVENATION OF BIRPARA(APD) WATER SUPPLY SCHEME,SM/09897 |
Augmentation |
Birpara Sub-Division |
Alipurduar RWS,Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte. |
Birpara Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) |
08/12/2021 |
11/01/2022 |
31/05/2025 |
29/12/2025 |
6 |
0 |
45.48 |
37.82 |
98 |
83 |
| 76 |
Alipurduar Division |
ALIPURDUAR |
Kalchini |
REJUVENATION OF JAYANTI WATER SUPPLY SCHEME,SM/09898 |
Augmentation |
Birpara Sub-Division |
Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte.,HQ-A.E |
Birpara Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) |
08/12/2021 |
31/01/2022 |
31/05/2025 |
29/12/2025 |
12 |
608 |
47.48 |
38.71 |
95 |
82 |
| 77 |
Alipurduar Division |
ALIPURDUAR |
Alipurduar - II |
REJUVINATION OF JASHODANGA WATER SUPPLY SCHEME,SM/09899 |
Augmentation |
Alipurduar Sadar Sub-Division |
Alipurduar Sadar Sub Division,Assistant Engineer,Cooch-Behar Mechanical Sub-Division, PHE Dte. |
Alipurduar Sub Division,Junior Engineer 1, Northern Mechanical Division-II,PHE Dte. |
08/12/2021 |
31/01/2022 |
31/05/2025 |
29/12/2025 |
6 |
0 |
45.28 |
34.57 |
97 |
76 |
| 78 |
Alipurduar Division |
ALIPURDUAR |
Madarihat |
REJUVENATION OF 'PASCHIM KHAIRBARI WATER SUPPLY SCHEME',SM/09900 |
Augmentation |
Alipurduar Sadar Sub-Division |
Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte.,Birpara A.E |
Alipurduar Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) |
08/12/2021 |
27/12/2021 |
31/07/2025 |
29/12/2025 |
1 |
0 |
45.23 |
2.87 |
50 |
6 |
| 79 |
Alipurduar Division |
ALIPURDUAR |
Madarihat |
REJUVENATION OF HANTUPARA TG WATER SUPPLY SCHEME',SM/09901 |
Augmentation |
Alipurduar Sadar Sub-Division |
Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte.,Birpara A.E |
Alipurduar Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) |
08/12/2021 |
23/02/2022 |
30/06/2025 |
29/12/2025 |
6 |
0 |
44.25 |
31.47 |
90 |
71 |
| 80 |
Alipurduar Division |
ALIPURDUAR |
Madarihat |
REJUVINATION OF ' UTTAR MADARIHAT WATER SUPPLY SCHEME',SM/09902 |
Augmentation |
Alipurduar Sadar Sub-Division |
Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte.,Birpara A.E |
Alipurduar Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) |
08/12/2021 |
11/01/2022 |
30/06/2025 |
29/12/2025 |
5 |
0 |
47.49 |
37.43 |
86 |
79 |
| 81 |
Alipurduar Division |
ALIPURDUAR |
Falakata |
REJUVENATION OF CHOTO SALKUMAR WATER SUPPLY SCHEME,SM/09903 |
Augmentation |
Alipurduar Sadar Sub-Division |
Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte.,Birpara A.E |
Alipurduar Sub Division,Junior Engineer 2, Cooch-Behar Mechanical Sub-Division, PHE Dte.(Gourab Mallick) |
08/12/2021 |
14/01/2022 |
31/05/2025 |
29/12/2025 |
9 |
0 |
45.22 |
29.71 |
93 |
66 |
| 82 |
Alipurduar Division |
ALIPURDUAR |
Kalchini |
Rejuvenation Of Dima T.G. W.S.S,SM/09904 |
Augmentation |
Birpara Sub-Division |
Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte.,HQ-A.E |
Birpara Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) |
08/12/2021 |
27/12/2021 |
31/05/2025 |
29/12/2025 |
7 |
0 |
44.51 |
13.51 |
70 |
30 |
| 83 |
Alipurduar Division |
ALIPURDUAR |
Alipurduar - II |
REJUVENATION OF 'LOKNATHPUR WATER SUPPLY SCHEME',SM/09905 |
Augmentation |
Alipurduar Sadar Sub-Division |
Alipurduar Sadar Sub Division,Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte. |
Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda),RWS Alipurduar - II Block |
08/12/2021 |
11/01/2022 |
30/06/2025 |
29/12/2025 |
9 |
0 |
45.51 |
11.00 |
97 |
24 |
| 84 |
Alipurduar Division |
ALIPURDUAR |
Madarihat |
Rejuvenation of Gargenda Tea Garden Water Supply Scheme,SM/09906 |
Augmentation |
Alipurduar Sadar Sub-Division |
Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte.,Birpara A.E |
Alipurduar Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) |
08/12/2021 |
31/01/2022 |
30/06/2025 |
29/12/2025 |
2 |
0 |
45.22 |
14.94 |
94 |
33 |
| 85 |
Alipurduar Division |
ALIPURDUAR |
Alipurduar - II |
REJUVENATION OF SALSALABARI WATER SUPPLY SCHEME,SM/09907 |
Augmentation |
Alipurduar Sadar Sub-Division |
Alipurduar Sadar Sub Division,Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte. |
Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda),RWS Alipurduar - II Block |
08/12/2021 |
25/02/2022 |
31/05/2025 |
29/12/2025 |
3 |
0 |
44.74 |
2.39 |
98 |
5 |
| 86 |
Alipurduar Division |
ALIPURDUAR |
Alipurduar - I |
REJUVENATION OF 'TAPSHIKHATA WATER SUPPLY SCHEME',SM/09908 |
Augmentation |
Birpara Sub-Division |
Alipurduar RWS,Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte. |
Birpara Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) |
08/12/2021 |
11/01/2022 |
31/05/2025 |
29/12/2025 |
6 |
0 |
46.31 |
32.42 |
85 |
70 |
| 87 |
Alipurduar Division |
ALIPURDUAR |
Kalchini |
REJUVENATION OF MADHU TG WATER SUPPLY SCHEME,SM/09909 |
Augmentation |
Alipurduar Division |
Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte.,HQ-A.E |
Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) |
08/12/2021 |
11/01/2022 |
31/07/2025 |
29/12/2025 |
6 |
0 |
45.46 |
35.45 |
72 |
78 |
| 88 |
Alipurduar Division |
ALIPURDUAR |
Alipurduar - I |
REJUVENATION OF PAITKAPARA WATER SUPPLY SCHEME,SM/09910 |
Augmentation |
Birpara Sub-Division |
Alipurduar RWS,Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte. |
Birpara Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) |
08/12/2021 |
27/12/2021 |
31/05/2025 |
29/12/2025 |
5 |
0 |
47.45 |
23.06 |
95 |
49 |
| 89 |
Alipurduar Division |
ALIPURDUAR |
Madarihat |
Dheklapara Tea Garden Area Piped Water Supply Scheme in relation with Chaa Sundari Project.,SM/10038 |
New |
Birpara Sub-Division |
Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte.,Birpara A.E |
Birpara Sub Division |
19/01/2022 |
21/02/2022 |
30/06/2025 |
29/12/2025 |
4 |
567 |
247.03 |
76.67 |
90 |
31 |
| 90 |
Alipurduar Division |
ALIPURDUAR |
Kalchini |
Torsha Tea Garden Area Piped Water Supply Scheme in relation with Chaa Sundari Project.,SM/10039 |
New |
Alipurduar Division |
Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte.,HQ-A.E |
Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda),RWS Kalchini Block |
19/01/2022 |
26/04/2022 |
30/06/2025 |
29/12/2025 |
10 |
1,348 |
284.23 |
266.23 |
90 |
94 |
| 91 |
Alipurduar Division |
ALIPURDUAR |
Madarihat |
Supply of Potable Drinking Water to Lankapara Tea Garden Area Piped Water Supply Scheme in relation with Chaa Sundari Project.,SM/10054 |
New |
Birpara Sub-Division |
Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte.,Birpara A.E |
Birpara Sub Division |
25/01/2022 |
11/08/2023 |
30/06/2025 |
29/12/2025 |
11 |
2,682 |
332.16 |
148.86 |
75 |
45 |
| 92 |
Alipurduar Division |
ALIPURDUAR |
Kumargram |
AUGMENTATION OF NARATHALI PIPED WATER SUPPLY SCHEME,SM/10154 |
Augmentation |
Alipurduar Sadar Sub-Division |
Alipurduar Sadar Sub Division,Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte. |
Alipurduar Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) |
11/02/2022 |
01/02/2022 |
30/06/2025 |
29/12/2025 |
23 |
3,764 |
632.84 |
578.97 |
90 |
91 |
| 93 |
Alipurduar Division |
ALIPURDUAR |
Alipurduar - II |
REJUVENATION OF TATPARA PIPED WATER SUPPLY SCHEME,SM/10155 |
Augmentation |
Alipurduar Sadar Sub-Division |
Alipurduar Sadar Sub Division,Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte. |
Alipurduar Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) |
11/02/2022 |
24/02/2022 |
30/06/2025 |
29/12/2025 |
7 |
1,040 |
140.66 |
136.56 |
90 |
97 |
| 94 |
Alipurduar Division |
ALIPURDUAR |
Falakata |
AUGMENTATION OF JATESWAR PIPED WATER SUPPLY SCHEME,SM/10156 |
Augmentation |
Alipurduar Sadar Sub-Division |
Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte.,Birpara A.E |
Alipurduar Sub Division,Junior Engineer 2, Cooch-Behar Mechanical Sub-Division, PHE Dte.(Gourab Mallick) |
11/02/2022 |
01/02/2022 |
30/06/2025 |
29/12/2025 |
24 |
1,020 |
706.17 |
504.48 |
68 |
71 |
| 95 |
Alipurduar Division |
ALIPURDUAR |
Falakata |
AUGMENTATION OF JAGIJHORA BARABAK PIPED WATER SUPPLY SCHEME,SM/10169 |
Augmentation |
Alipurduar Sadar Sub-Division |
Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte.,Birpara A.E |
Alipurduar Sub Division,Junior Engineer 2, Cooch-Behar Mechanical Sub-Division, PHE Dte.(Gourab Mallick) |
16/02/2022 |
17/02/2022 |
31/05/2025 |
29/12/2025 |
17 |
1,527 |
378.84 |
149.63 |
90 |
39 |
| 96 |
Alipurduar Division |
ALIPURDUAR |
Kumargram |
REJUVENATION OF UTTAR KAMAKHYAGURI PIPED WATER SUPPLY SCHEME,SM/10170 |
Augmentation |
Alipurduar Sadar Sub-Division |
Alipurduar Sadar Sub Division,Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte. |
Alipurduar Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) |
16/02/2022 |
01/02/2022 |
31/05/2025 |
29/12/2025 |
20 |
2,836 |
509.72 |
312.74 |
92 |
61 |
| 97 |
Alipurduar Division |
ALIPURDUAR |
Alipurduar - II |
AUGMENTATION OF UTTAR MAJHER DABRI PIPED WATER SUPPLY SCHEME,SM/10171 |
Augmentation |
Alipurduar Sadar Sub-Division |
Alipurduar Sadar Sub Division,Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte. |
Alipurduar Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) |
16/02/2022 |
01/02/2022 |
31/05/2025 |
29/12/2025 |
21 |
3,164 |
750.42 |
618.84 |
92 |
82 |
| 98 |
Alipurduar Division |
ALIPURDUAR |
Alipurduar - I |
MATHURA TEA GARDEN AREA PIPED WATER SUPPLY SCHEME,SM/10172 |
New |
Birpara Sub-Division |
Alipurduar RWS,Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte. |
Birpara Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) |
16/02/2022 |
17/02/2022 |
31/05/2025 |
29/12/2025 |
14 |
2,579 |
810.28 |
603.98 |
90 |
75 |
| 99 |
Alipurduar Division |
ALIPURDUAR |
Madarihat |
MADARIHAT TEA GARDEN AREA PIPED WATER SUPPLY SCHEME,SM/10173 |
New |
Birpara Sub-Division |
Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte.,Birpara A.E |
Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) |
16/02/2022 |
17/02/2022 |
31/12/2025 |
29/12/2025 |
22 |
2,277 |
886.25 |
844.20 |
88 |
95 |
| 100 |
Alipurduar Division |
ALIPURDUAR |
Alipurduar - I |
DAKSHIN PAITKAPARA PIPED WATER SUPPLY SCHEME,SM/10174 |
New |
Birpara Sub-Division |
Alipurduar RWS,Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte. |
Birpara Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) |
16/02/2022 |
17/02/2022 |
30/06/2025 |
29/12/2025 |
15 |
1,867 |
732.56 |
650.15 |
90 |
89 |
| 101 |
Alipurduar Division |
ALIPURDUAR |
Alipurduar - I |
SIDHABARI PIED WATER SUPPLY SCHEME,SM/10175 |
New |
Birpara Sub-Division |
Alipurduar RWS,Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte. |
Birpara Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) |
16/02/2022 |
17/02/2022 |
31/07/2025 |
29/12/2025 |
13 |
1,605 |
360.32 |
311.00 |
65 |
86 |
| 102 |
Alipurduar Division |
ALIPURDUAR |
Kalchini |
MECHPARA TEA GARDEN AREA PIPED WATER SUPPLY SCHEME,SM/10176 |
New |
Birpara Sub-Division |
Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte.,HQ-A.E |
Birpara Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) |
16/02/2022 |
17/02/2022 |
31/07/2025 |
29/12/2025 |
14 |
1,425 |
426.36 |
312.49 |
75 |
73 |
| 103 |
Alipurduar Division |
ALIPURDUAR |
Madarihat |
JAYBIRPARA TEA GARDEN AREA PIPED WATER SUPPLY SCHEME,SM/10177 |
New |
Alipurduar Sadar Sub-Division |
Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte.,Birpara A.E |
Alipurduar Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) |
16/02/2022 |
17/02/2022 |
31/05/2025 |
29/12/2025 |
9 |
1,248 |
338.59 |
240.46 |
70 |
71 |
| 104 |
Alipurduar Division |
ALIPURDUAR |
Madarihat |
GOPALPUR TEA GARDEN AREA PIPED WATER SUPPLY SCHEME,SM/10178 |
New |
Alipurduar Sadar Sub-Division |
Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte.,Birpara A.E |
Alipurduar Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) |
16/02/2022 |
17/02/2022 |
30/06/2025 |
29/12/2025 |
19 |
1,487 |
577.33 |
533.58 |
85 |
92 |
| 105 |
Alipurduar Division |
ALIPURDUAR |
Kumargram |
CHUNIA JHORA TEA GARDEN AREA PIPED WATER SUPPLY SCHEME,SM/10179 |
New |
Alipurduar Sadar Sub-Division |
Alipurduar Sadar Sub Division,Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte. |
Alipurduar Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) |
16/02/2022 |
17/02/2022 |
31/12/2025 |
29/12/2025 |
10 |
647 |
364.15 |
342.98 |
90 |
94 |
| 106 |
Alipurduar Division |
ALIPURDUAR |
Kalchini |
GANGUTIA TEA GARDEN AREA PIPED WATER SUPPLY SHEME,SM/10180 |
New |
Birpara Sub-Division |
Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte.,HQ-A.E |
Birpara Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) |
16/02/2022 |
17/02/2022 |
31/05/2025 |
29/12/2025 |
9 |
1,250 |
376.91 |
354.16 |
86 |
94 |
| 107 |
Alipurduar Division |
ALIPURDUAR |
Alipurduar - I |
AUGMENTATION OF SALKUMARHAT PIPED WATER SUPPLY SCHEME,SM/10316 |
Augmentation |
Birpara Sub-Division |
Alipurduar RWS,Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte. |
Birpara Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) |
04/03/2022 |
02/05/2022 |
30/06/2025 |
29/12/2025 |
18 |
2,393 |
281.05 |
73.92 |
85 |
26 |
| 108 |
Alipurduar Division |
ALIPURDUAR |
Kalchini |
Providing FHTC of existing LDS under command area UTTARLATABARI WSS at Kalchini Block.,SM/10637 |
Augmentation |
Birpara Sub-Division |
HQ-A.E |
Birpara Sub Division |
21/04/2022 |
11/05/2022 |
30/06/2025 |
29/12/2025 |
14 |
3,877 |
252.10 |
124.40 |
85 |
49 |
| 109 |
Alipurduar Division |
ALIPURDUAR |
Alipurduar - II |
AUGMENTATION OF BAKLA WATER SUPPLY SCHEME,SM/10667 |
Augmentation |
Alipurduar Sadar Sub-Division |
Alipurduar Sadar Sub Division,Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte. |
Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda),RWS Alipurduar - II Block |
29/04/2022 |
21/11/2022 |
31/07/2025 |
29/12/2025 |
8 |
40 |
186.88 |
58.88 |
61 |
32 |
| 110 |
Alipurduar Division |
ALIPURDUAR |
Alipurduar - II |
AUGMENTATION OF JASHODANGA WATER SUPPLY SCHEME,SM/10668 |
Augmentation |
Alipurduar Sadar Sub-Division |
Alipurduar Sadar Sub Division,Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte. |
Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda),RWS Alipurduar - II Block |
29/04/2022 |
14/03/2023 |
31/05/2025 |
29/12/2025 |
4 |
20 |
69.44 |
24.09 |
90 |
35 |
| 111 |
Alipurduar Division |
ALIPURDUAR |
Alipurduar - II |
AUGMENTATION OF PURBA CHEPANI WATER SUPPLY SCHEME,SM/10669 |
Augmentation |
Alipurduar Sadar Sub-Division |
Alipurduar Sadar Sub Division,Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte. |
Alipurduar Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) |
29/04/2022 |
10/08/2022 |
30/06/2025 |
29/12/2025 |
10 |
50 |
161.24 |
23.55 |
30 |
15 |
| 112 |
Alipurduar Division |
ALIPURDUAR |
Alipurduar - II |
AUGMENTATION OF SALSALABARI WATER SUPPLY SCHEME.,SM/10670 |
Augmentation |
Alipurduar Sadar Sub-Division |
Alipurduar Sadar Sub Division,Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte. |
Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda),RWS Alipurduar - II Block |
29/04/2022 |
19/09/2022 |
31/07/2025 |
29/12/2025 |
7 |
45 |
108.13 |
34.26 |
60 |
32 |
| 113 |
Alipurduar Division |
ALIPURDUAR |
Alipurduar - I |
AUGMENTATION OF BIRPARA (APD) WATER SUPPLY SCHEME,SM/10671 |
Augmentation |
Birpara Sub-Division |
Alipurduar RWS,Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte. |
Birpara Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) |
29/04/2022 |
13/05/2022 |
31/05/2025 |
29/12/2025 |
7 |
38 |
152.39 |
22.83 |
88 |
15 |
| 114 |
Alipurduar Division |
ALIPURDUAR |
Madarihat |
AUGMENTATION OF PASCHIM KHAIRBARI WATER SUPPLY SCHEME,SM/10672 |
Augmentation |
Birpara Sub-Division |
Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte.,Birpara A.E |
Birpara Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) |
29/04/2022 |
10/08/2022 |
31/07/2025 |
29/12/2025 |
6 |
30 |
162.74 |
1.19 |
75 |
1 |
| 115 |
Alipurduar Division |
ALIPURDUAR |
Alipurduar - II |
AUGMENTATION OF LOKNATHPUR WATER SUPPLY SCHEME,SM/10673 |
Augmentation |
Alipurduar Sadar Sub-Division |
Alipurduar Sadar Sub Division,Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte. |
Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda),RWS Alipurduar - II Block |
29/04/2022 |
13/05/2022 |
30/06/2025 |
29/12/2025 |
8 |
50 |
252.98 |
28.92 |
85 |
11 |
| 116 |
Alipurduar Division |
ALIPURDUAR |
Alipurduar - I |
AUGMENTATION OF BANCHUKAMARI WATER SUPPLY SCHEME,SM/10674 |
Augmentation |
Birpara Sub-Division |
Alipurduar RWS,Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte. |
Birpara Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) |
29/04/2022 |
10/08/2022 |
31/07/2025 |
29/12/2025 |
6 |
60 |
236.97 |
45.27 |
70 |
19 |
| 117 |
Alipurduar Division |
ALIPURDUAR |
Alipurduar - I |
AUGMENTATION OF MUNSHIPARA WATER SUPPLY SCHEME,SM/10675 |
Augmentation |
Birpara Sub-Division |
Alipurduar RWS,Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte. |
Birpara Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) |
29/04/2022 |
16/03/2023 |
31/10/2025 |
29/12/2025 |
3 |
50 |
178.64 |
51.29 |
85 |
29 |
| 118 |
Alipurduar Division |
ALIPURDUAR |
Alipurduar - I |
AUGMENTATION OF TAPASHIKHATA PIPED WATER SUPPLY SCHEME,SM/10676 |
Augmentation |
Birpara Sub-Division |
Alipurduar RWS,Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte. |
Birpara Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) |
29/04/2022 |
13/05/2022 |
31/05/2025 |
29/12/2025 |
8 |
40 |
252.39 |
39.20 |
85 |
16 |
| 119 |
Alipurduar Division |
ALIPURDUAR |
Alipurduar - II |
AUGMENTATION OF CHANDIRJHAR WATER SUPPLY SCHEME,SM/10677 |
Augmentation |
Alipurduar Sadar Sub-Division |
Alipurduar Sadar Sub Division,Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte. |
Alipurduar Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) |
29/04/2022 |
13/05/2022 |
31/05/2025 |
29/12/2025 |
7 |
2,678 |
192.09 |
15.52 |
85 |
8 |
| 120 |
Alipurduar Division |
ALIPURDUAR |
Falakata |
AUGMENTATION OF JOGENDRAPUR WATER SUPPLY SCHEME,SM/10678 |
Augmentation |
Birpara Sub-Division |
Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte.,Birpara A.E |
Birpara Sub Division,Junior Engineer 2, Cooch-Behar Mechanical Sub-Division, PHE Dte.(Gourab Mallick) |
29/04/2022 |
01/03/2023 |
31/05/2025 |
29/12/2025 |
7 |
2,100 |
274.45 |
73.02 |
90 |
27 |
| 121 |
Alipurduar Division |
ALIPURDUAR |
Falakata |
IMPLEMENTATION OF STANDALONE WATER SUPPLY SYSTEM IN THE VILLAGES HAVING LESS THAN 100 HOUSEHOLD UNDER ALIPURDUAR DISTRICT PIPED WATER SUPPLY SCHEME,SM/10776 |
New |
Birpara Sub-Division |
Birpara A.E |
Birpara Sub Division |
23/05/2022 |
31/05/2022 |
31/05/2025 |
29/12/2025 |
2 |
0 |
167.97 |
97.37 |
91 |
58 |
| 122 |
Alipurduar Division |
ALIPURDUAR |
Alipurduar - I |
AUGMENTATION OF PATLAKHAWA WATER SUPPLY SCHEME,SM/11401 |
Augmentation |
Birpara Sub-Division |
Alipurduar RWS,Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte. |
Birpara Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) |
04/07/2022 |
07/07/2022 |
31/07/2025 |
29/12/2025 |
10 |
2,981 |
140.89 |
133.68 |
75 |
95 |
| 123 |
Alipurduar Division |
ALIPURDUAR |
Kalchini |
AUGMENTATION OF JAYANTI PIPED WATER SUPPLY SCHEME,SM/11402 |
Augmentation |
Alipurduar Division |
Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte.,HQ-A.E |
Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) |
04/07/2022 |
07/07/2022 |
30/06/2025 |
29/12/2025 |
10 |
608 |
86.31 |
66.62 |
90 |
77 |
| 124 |
Alipurduar Division |
ALIPURDUAR |
Alipurduar - I |
AUGMENTATION OF PURBA KATHALBARI WATER SUPPLY SCHEME,SM/11459 |
Augmentation |
Birpara Sub-Division |
Alipurduar RWS,Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte. |
Birpara Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) |
12/07/2022 |
15/07/2022 |
31/07/2025 |
29/12/2025 |
46 |
7,440 |
1,873.61 |
1,127.98 |
72 |
60 |
| 125 |
Alipurduar Division |
ALIPURDUAR |
Kumargram |
KUMARGRAM TG AREA PIPED WATER SUPPLY SCHEME,SM/11482 |
New |
Alipurduar Sadar Sub-Division |
Alipurduar Sadar Sub Division,Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte. |
Alipurduar Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) |
14/07/2022 |
15/07/2022 |
31/05/2025 |
29/12/2025 |
18 |
1,493 |
395.23 |
221.80 |
90 |
56 |
| 126 |
Alipurduar Division |
ALIPURDUAR |
Madarihat |
Bandpani Tea Garden Areas Piped Water Supply Scheme.,SM/11483 |
New |
Alipurduar Sadar Sub-Division |
Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte.,Birpara A.E |
Alipurduar Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) |
14/07/2022 |
15/07/2022 |
30/06/2025 |
29/12/2025 |
18 |
1,272 |
528.37 |
299.93 |
80 |
57 |
| 127 |
Alipurduar Division |
ALIPURDUAR |
Kumargram |
NEWLANDS TG AREA PIPED WATER SUPPLY SCHEME,SM/11484 |
New |
Alipurduar Sadar Sub-Division |
Alipurduar Sadar Sub Division,Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte. |
Birpara Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) |
14/07/2022 |
15/07/2022 |
31/05/2025 |
29/12/2025 |
16 |
1,520 |
455.23 |
284.48 |
90 |
62 |
| 128 |
Alipurduar Division |
ALIPURDUAR |
Kumargram |
SANKOSH TG AREA PIPED WATER SUPPLY SCHEME,SM/11485 |
New |
Alipurduar Sadar Sub-Division |
Alipurduar Sadar Sub Division,Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte. |
Birpara Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) |
14/07/2022 |
15/07/2022 |
31/12/2025 |
29/12/2025 |
13 |
1,567 |
389.92 |
260.28 |
90 |
67 |
| 129 |
Alipurduar Division |
ALIPURDUAR |
Madarihat |
HOASINBAD TEA GARDEN AREA PIPED WATER SUPPLY SCHEME,SM/11696 |
New |
Alipurduar Sadar Sub-Division |
Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte.,Birpara A.E |
Alipurduar Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) |
29/07/2022 |
10/11/2022 |
31/05/2025 |
29/12/2025 |
9 |
990 |
411.35 |
250.78 |
85 |
61 |
| 130 |
Alipurduar Division |
ALIPURDUAR |
Alipurduar - II |
SHRINATHPUR TEA GARDEN AREA PIPED WATER SUPPLY SCHEME,SM/11709 |
New |
Alipurduar Sadar Sub-Division |
Alipurduar Sadar Sub Division,Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte. |
Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda),RWS Alipurduar - II Block |
29/07/2022 |
10/11/2022 |
31/05/2025 |
29/12/2025 |
26 |
1,702 |
817.44 |
676.53 |
95 |
83 |
| 131 |
Alipurduar Division |
ALIPURDUAR |
|
DRINKINH WATER SAMPLE COLLECTION & TESTING THROUGH FIELD TEST KIT (FTKs) & UPLOADING CHARGES FOR THE SAME RELATED TO WATER QUALITY MONITORING & SURVEILLANCE PROGRAMME UNDER JAL JEEVAN MISSION,SM/11752 |
Support |
|
|
|
03/08/2022 |
07/08/2023 |
31/03/2025 |
29/01/2024 |
4 |
0 |
18.35 |
11.98 |
60 |
65 |
| 132 |
Alipurduar Division |
ALIPURDUAR |
Madarihat |
AUGMENTATION OF TOTOPARA AREA PIPED WATER SUPPLY SCHEME,SM/11765 |
Augmentation |
Birpara Sub-Division |
Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte.,Birpara A.E |
Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda),RWS Madarihat - Birpara Block |
03/08/2022 |
04/04/2023 |
31/05/2025 |
29/12/2025 |
5 |
110 |
154.07 |
63.97 |
60 |
42 |
| 133 |
Alipurduar Division |
ALIPURDUAR |
Madarihat |
AUGMENTATION OF NEPANIA PIPED WATER SUPPLY SCHEME,SM/11766 |
Augmentation |
Alipurduar Sadar Sub-Division |
Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte.,Birpara A.E |
Alipurduar Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) |
03/08/2022 |
13/12/2022 |
31/07/2025 |
29/12/2025 |
4 |
400 |
88.14 |
47.46 |
75 |
54 |
| 134 |
Alipurduar Division |
ALIPURDUAR |
Madarihat |
AUGMENTATION OF LANKAPARA TG FOR LONKAPARA HAT AREA PIPED WATER SUPPLY SCHEME,SM/11767 |
Augmentation |
Birpara Sub-Division |
Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte.,Birpara A.E |
Birpara Sub Division,Junior Engineer 1, Cooch-Behar Mechanical Sub-Division, PHE(Md. Mahfuz) Dte. |
03/08/2022 |
13/12/2022 |
31/12/2025 |
29/12/2025 |
14 |
250 |
204.15 |
88.32 |
80 |
43 |
| 135 |
Alipurduar Division |
ALIPURDUAR |
|
OPERATIONAL CHARGES OF PHED MANAGED LABORATORIES RELATED TO WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION,SM/11878 |
Support |
|
|
|
17/08/2022 |
21/02/2023 |
31/03/2025 |
29/01/2024 |
5 |
0 |
21.39 |
11.92 |
55 |
56 |
| 136 |
Alipurduar Division |
ALIPURDUAR |
Kumargram |
AUGMENTATION OF KAIJALI BASTY WATER SUPPLY SCHEME,SM/11958 |
Augmentation |
Alipurduar Sadar Sub-Division |
Alipurduar Sadar Sub Division,Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte. |
Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda),RWS Alipurduar - II Block |
25/08/2022 |
21/11/2022 |
30/11/2025 |
29/12/2025 |
17 |
493 |
562.16 |
224.20 |
85 |
40 |
| 137 |
Alipurduar Division |
ALIPURDUAR |
Madarihat |
AUGMENTATION OF UTTAR SISUBARI WATER SUPPLY SCHEME,SM/11959 |
Augmentation |
Birpara Sub-Division |
Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte.,Birpara A.E |
Birpara Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) |
25/08/2022 |
19/05/2023 |
30/06/2025 |
29/12/2025 |
10 |
807 |
648.63 |
71.05 |
65 |
11 |
| 138 |
Alipurduar Division |
ALIPURDUAR |
Madarihat |
AUGMENTATION OF DALMORE & RAMJHORA TEA GARDEN PIPED WATER SUPPLY SCHEME,SM/11960 |
Augmentation |
Birpara Sub-Division |
Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte.,Birpara A.E |
Birpara Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) |
25/08/2022 |
22/12/2022 |
30/06/2025 |
29/12/2025 |
10 |
1,031 |
512.91 |
142.58 |
72 |
28 |
| 139 |
Alipurduar Division |
ALIPURDUAR |
Alipurduar - I |
AUGMENTATION OF DAKSHIN SONAPUR WATER SUPPLY SCHEME,SM/11970 |
Augmentation |
Alipurduar RWS Sub-Division |
Alipurduar RWS,Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte. |
Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda),RWS Alipurduar - I Block |
29/08/2022 |
05/09/2022 |
31/12/2025 |
29/12/2025 |
31 |
7,780 |
1,275.43 |
476.79 |
70 |
37 |
| 140 |
Alipurduar Division |
ALIPURDUAR |
Kumargram |
AUGMENTATION OF KUMARGRAM PIPED WATER SUPPLY SCHEME,SM/11985 |
Augmentation |
Alipurduar Sadar Sub-Division |
Alipurduar Sadar Sub Division,Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte. |
Alipurduar Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) |
01/09/2022 |
05/09/2022 |
30/06/2025 |
29/12/2025 |
31 |
7,273 |
2,156.38 |
1,186.57 |
75 |
55 |
| 141 |
Alipurduar Division |
ALIPURDUAR |
Kumargram |
KARTIKA TEA GARDEN AREA PIPED WAATER SUPPLY SCHEME,SM/11991 |
New |
Alipurduar Sadar Sub-Division |
Alipurduar Sadar Sub Division,Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte. |
Birpara Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) |
01/09/2022 |
21/11/2022 |
31/05/2025 |
29/12/2025 |
12 |
1,128 |
432.05 |
334.17 |
90 |
77 |
| 142 |
Alipurduar Division |
ALIPURDUAR |
Kumargram |
PHASKHAWA TEA GARDEN AREA PIPED WATER SUPPLY SCHEME,SM/11992 |
New |
Alipurduar Sadar Sub-Division |
Alipurduar Sadar Sub Division |
Birpara Sub Division |
01/09/2022 |
21/11/2022 |
31/05/2025 |
29/12/2025 |
11 |
705 |
269.79 |
171.43 |
85 |
64 |
| 143 |
Alipurduar Division |
ALIPURDUAR |
Alipurduar - II |
KOHINUR TEA GARDEN AREA PIPED WATER SUPPLY SCHEME,SM/12113 |
New |
Alipurduar Sadar Sub-Division |
Alipurduar Sadar Sub Division,Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte. |
Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda),RWS Alipurduar - II Block |
02/09/2022 |
21/11/2022 |
31/07/2025 |
29/12/2025 |
19 |
2,542 |
821.35 |
386.88 |
81 |
47 |
| 144 |
Alipurduar Division |
ALIPURDUAR |
Kalchini |
AUGMENTATION OF HASIMARA WATER SUPPLY SCHEME,SM/12361 |
Augmentation |
Alipurduar Division |
Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte.,HQ-A.E |
Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda),RWS Kalchini Block |
13/09/2022 |
10/01/2023 |
30/06/2025 |
29/12/2025 |
26 |
1,277 |
1,269.79 |
197.05 |
35 |
16 |
| 145 |
Alipurduar Division |
ALIPURDUAR |
|
PROCUREMENT OF CHEMICALS - GLASSWARE & MAINTENANCE OF COMPUTER OF PHED MANAGED LABORATORIES,SM/12752 |
Support |
|
|
|
20/09/2022 |
31/03/2023 |
31/03/2025 |
29/01/2024 |
1 |
0 |
41.13 |
0.74 |
10 |
2 |
| 146 |
Alipurduar Division |
ALIPURDUAR |
Madarihat |
SISHA JUMRHA PIPED WATER SUPPLY SCHEME,SM/12753 |
New |
Birpara Sub-Division |
Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte.,Birpara A.E |
Birpara Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) |
20/09/2022 |
27/03/2023 |
30/06/2025 |
29/12/2025 |
11 |
2,683 |
797.79 |
489.59 |
88 |
61 |
| 147 |
Alipurduar Division |
ALIPURDUAR |
|
PROCUREMENT OF CHEMICALS,CRM,GLASSWARE,INSTRUMENT & EQUIPMENT WITH MISCELLANEOUS ITEMS FOR INFRASTRUCTURE DEVELOPEMENT OF SAMUKTALA SUB DISTRICT LABORATORY FOR NABL SET-UP UNDER ALIPURDUAR DIVISION, P.H.E. DTE., 2022,SM/12909 |
Support |
|
|
|
29/09/2022 |
31/03/2023 |
31/03/2025 |
29/01/2024 |
3 |
0 |
12.66 |
1.56 |
20 |
12 |
| 148 |
Alipurduar Division |
ALIPURDUAR |
|
PROCUREMENT OF CHEMICALS,CRM,GLASSWARE,INSTRUMENT & EQUIPMENT WITH MISCELLANEOUS ITEMS FOR INFRASTRUCTURE DEVELOPEMENT OF BIRPARA SUB DISTRICT LABORATORY FOR NABL SET-UP UNDER ALIPURDUAR DIVISION, P.H.E. DTE., 2022,SM/12910 |
Support |
|
|
|
29/09/2022 |
11/11/2023 |
31/03/2025 |
29/01/2024 |
3 |
0 |
12.66 |
5.37 |
20 |
42 |
| 149 |
Alipurduar Division |
ALIPURDUAR |
|
PROCUREMENT OF CHEMICALS,CRM,GLASSWARE,INSTRUMENT & EQUIPMENT WITH MISCELLANEOUS ITEMS FOR INFRASTRUCTURE DEVELOPEMENT OF ALIPURDUAR DISTRICT LABORATORY FOR NABL SET-UP UNDER ALIPURDUAR DIVISION, P.H.E. DTE., 2022,SM/12911 |
Support |
|
|
|
29/09/2022 |
12/07/2023 |
31/03/2025 |
29/01/2024 |
6 |
0 |
32.31 |
28.00 |
20 |
87 |
| 150 |
Alipurduar Division |
ALIPURDUAR |
Falakata |
KADAMBINI TEA GARDEN AREA PIPED WATER SUPPLY SCHEME,SM/13239 |
New |
Birpara Sub-Division |
Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte.,Birpara A.E |
Junior Engineer 2, Cooch-Behar Mechanical Sub-Division, PHE Dte.(Gourab Mallick),RWS Falakata Block |
14/10/2022 |
17/01/2023 |
31/05/2025 |
29/12/2025 |
16 |
4,031 |
716.98 |
556.42 |
88 |
78 |
| 151 |
Alipurduar Division |
ALIPURDUAR |
Kumargram |
PASCHIM CHENGMARI PIPED WATER SUPPLY SCHEME ,SM/13240 |
New |
Alipurduar Sadar Sub-Division |
Alipurduar Sadar Sub Division,Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte. |
Birpara Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) |
14/10/2022 |
17/01/2023 |
30/06/2025 |
29/12/2025 |
10 |
929 |
741.26 |
282.19 |
88 |
38 |
| 152 |
Alipurduar Division |
ALIPURDUAR |
Kumargram |
BARUIPARA AND ADJOINING MOUZAS PIPED WATER SUPPLY SCHEME,SM/13241 |
New |
Alipurduar Sadar Sub-Division |
Alipurduar Sadar Sub Division,Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte. |
Alipurduar Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) |
14/10/2022 |
17/01/2023 |
30/06/2025 |
29/12/2025 |
15 |
1,437 |
780.16 |
268.75 |
50 |
34 |
| 153 |
Alipurduar Division |
ALIPURDUAR |
Kumargram |
CHUOTA DALDALI PIPED WATER SUPPLY SCHEME.,SM/13242 |
New |
Alipurduar Sadar Sub-Division |
Alipurduar Sadar Sub Division,Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte. |
Alipurduar Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) |
14/10/2022 |
16/03/2023 |
31/05/2025 |
29/12/2025 |
16 |
1,001 |
615.61 |
162.47 |
55 |
26 |
| 154 |
Alipurduar Division |
ALIPURDUAR |
Kalchini |
NIMTI DOMOHANI PIPED WATER SUPPLY SCHEME,SM/13244 |
New |
Alipurduar Division |
Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte.,HQ-A.E |
Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda),RWS Kalchini Block |
14/10/2022 |
27/03/2023 |
31/05/2025 |
29/12/2025 |
15 |
1,482 |
710.27 |
425.50 |
88 |
60 |
| 155 |
Alipurduar Division |
ALIPURDUAR |
Kalchini |
PASCHIM SATALI PIPED WATER SUPPLY SCHEME,SM/13245 |
New |
Alipurduar Division |
Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte.,HQ-A.E |
Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda),RWS Kalchini Block |
14/10/2022 |
17/01/2023 |
30/06/2025 |
29/12/2025 |
12 |
2,797 |
969.65 |
637.24 |
85 |
66 |
| 156 |
Alipurduar Division |
ALIPURDUAR |
Alipurduar - I |
BARIGURI PIPED WATER SUPPLY SCHEME,SM/13246 |
New |
Alipurduar RWS Sub-Division |
Alipurduar RWS,Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte. |
Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda),RWS Alipurduar - I Block |
14/10/2022 |
16/05/2023 |
31/07/2025 |
29/12/2025 |
13 |
7,373 |
895.77 |
299.76 |
70 |
33 |
| 157 |
Alipurduar Division |
ALIPURDUAR |
Alipurduar - I |
PRODHANPARA PIPED WATER SUPPLY SCHEME,SM/13247 |
New |
Alipurduar RWS Sub-Division |
Alipurduar RWS,Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte. |
Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda),RWS Alipurduar - I Block |
14/10/2022 |
16/03/2023 |
31/05/2025 |
29/12/2025 |
10 |
1,353 |
638.14 |
219.96 |
85 |
34 |
| 158 |
Alipurduar Division |
ALIPURDUAR |
Madarihat |
MADHYA KHAIRBARI PIPED WATER SUPPLY SCHEME,SM/13248 |
New |
Birpara Sub-Division |
Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte.,Birpara A.E |
Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda),RWS Madarihat - Birpara Block |
14/10/2022 |
27/03/2023 |
31/05/2025 |
29/12/2025 |
15 |
2,462 |
877.17 |
532.96 |
82 |
61 |
| 159 |
Alipurduar Division |
ALIPURDUAR |
Kalchini |
BUXA FOREST (RAJA BHATKHAWA) PIPED WATER SUPPLY SCHEME,SM/13249 |
New |
Alipurduar Sadar Sub-Division |
Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte.,HQ-A.E |
Alipurduar Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) |
14/10/2022 |
23/03/2023 |
31/10/2025 |
29/12/2025 |
21 |
2,652 |
860.22 |
281.77 |
20 |
33 |
| 160 |
Alipurduar Division |
ALIPURDUAR |
Alipurduar - II |
KAYAKHATA PIPED WATER SUPPLY SCHEME,SM/13299 |
New |
Alipurduar Sadar Sub-Division |
Alipurduar Sadar Sub Division,Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte. |
Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda),RWS Alipurduar - II Block |
17/10/2022 |
16/03/2023 |
31/12/2025 |
29/12/2025 |
15 |
1,585 |
682.41 |
331.03 |
75 |
49 |
| 161 |
Alipurduar Division |
ALIPURDUAR |
Alipurduar - II |
BRAJERKUTHI PIPED WATER SUPPLY SCHEME,SM/13300 |
New |
Alipurduar Sadar Sub-Division |
Alipurduar Sadar Sub Division,Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte. |
Alipurduar Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) |
17/10/2022 |
17/01/2023 |
31/05/2025 |
29/12/2025 |
19 |
1,847 |
944.20 |
572.37 |
90 |
61 |
| 162 |
Alipurduar Division |
ALIPURDUAR |
Alipurduar - II |
PURBA CHIKLIGURI PIPED WATER SUPPLY SCHEME,SM/13301 |
New |
Alipurduar Sadar Sub-Division |
Alipurduar Sadar Sub Division,Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte. |
Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda),RWS Alipurduar - II Block |
17/10/2022 |
17/01/2023 |
31/07/2025 |
29/12/2025 |
11 |
1,869 |
875.66 |
464.09 |
70 |
53 |
| 163 |
Alipurduar Division |
ALIPURDUAR |
Alipurduar - I |
DAKSHIN BARAJHAR FOREST PIPED WATER SUPPLY SCHEME,SM/13302 |
New |
Alipurduar RWS Sub-Division |
Alipurduar RWS,Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte. |
Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda),RWS Alipurduar - I Block |
17/10/2022 |
19/01/2023 |
30/11/2025 |
29/12/2025 |
7 |
308 |
171.75 |
97.16 |
85 |
57 |
| 164 |
Alipurduar Division |
ALIPURDUAR |
Kumargram |
TELIPARA PIPED WATER SUPPLY SCHEME.,SM/13303 |
New |
Alipurduar Sadar Sub-Division |
Alipurduar Sadar Sub Division,Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte. |
Alipurduar Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) |
17/10/2022 |
31/03/2023 |
30/11/2025 |
29/12/2025 |
14 |
1,029 |
488.14 |
196.80 |
90 |
40 |
| 165 |
Alipurduar Division |
ALIPURDUAR |
Kumargram |
MARAKHATA PIPED WATER SUPPLY SCHEME.,SM/13304 |
New |
Alipurduar Sadar Sub-Division |
Alipurduar Sadar Sub Division,Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte. |
Birpara Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) |
17/10/2022 |
17/01/2023 |
31/05/2025 |
29/12/2025 |
15 |
3,129 |
839.09 |
374.45 |
86 |
45 |
| 166 |
Alipurduar Division |
ALIPURDUAR |
Alipurduar - I |
KALABERIA PIPED WATER SUPPLY SCHEME,SM/13306 |
New |
Alipurduar RWS Sub-Division |
Alipurduar RWS,Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte. |
Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda),RWS Alipurduar - I Block |
17/10/2022 |
27/03/2023 |
30/11/2025 |
29/12/2025 |
10 |
1,065 |
461.28 |
223.70 |
75 |
48 |
| 167 |
Alipurduar Division |
ALIPURDUAR |
Kumargram |
JAYANTI TEA GARDEN -II AREA PIPED WATER SUPPLY SCHEME,SM/13448 |
New |
Alipurduar Sadar Sub-Division |
Alipurduar Sadar Sub Division,Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte. |
Alipurduar Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) |
02/11/2022 |
06/06/2023 |
30/11/2025 |
29/12/2025 |
9 |
563 |
305.16 |
109.98 |
65 |
36 |
| 168 |
Alipurduar Division |
ALIPURDUAR |
Falakata |
ETHELBARI TEA GARDEN AREA PIPED WATER SUPPLY SCHEME ,SM/13449 |
New |
Alipurduar Sadar Sub-Division |
Alipurduar Sadar Sub Division,Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte. |
Alipurduar Sub Division,Junior Engineer 2, Cooch-Behar Mechanical Sub-Division, PHE Dte.(Gourab Mallick) |
02/11/2022 |
17/01/2023 |
31/12/2025 |
29/12/2025 |
16 |
1,856 |
695.45 |
507.01 |
88 |
73 |
| 169 |
Alipurduar Division |
ALIPURDUAR |
Kalchini |
ATIABARI TEA GARDEN PIPED WATER SUPPLY SCHEME.,SM/14092 |
New |
Alipurduar Sadar Sub-Division |
Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte.,HQ-A.E |
Alipurduar Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) |
12/12/2022 |
01/03/2023 |
31/05/2025 |
29/12/2025 |
16 |
1,884 |
895.42 |
622.50 |
88 |
70 |
| 170 |
Alipurduar Division |
ALIPURDUAR |
Kalchini |
RAJABHAT TEA GARDEN PIPED WATER SUPPLY SCHEME.,SM/14093 |
New |
Alipurduar Sadar Sub-Division |
Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte.,HQ-A.E |
Alipurduar Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) |
12/12/2022 |
01/03/2023 |
31/05/2025 |
29/12/2025 |
12 |
1,074 |
528.73 |
229.49 |
90 |
43 |
| 171 |
Alipurduar Division |
ALIPURDUAR |
Alipurduar - I |
PARARPAR PIPED WATER SUPPLY SCHEME,SM/14209 |
New |
Alipurduar RWS Sub-Division |
Alipurduar RWS,Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte. |
Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda),RWS Alipurduar - I Block |
10/01/2023 |
16/03/2023 |
31/05/2025 |
29/12/2025 |
16 |
1,187 |
561.82 |
259.93 |
70 |
46 |
| 172 |
Alipurduar Division |
ALIPURDUAR |
Alipurduar - I |
FOSKADANGA PIPED WATER SUPPLY SCHEME,SM/14210 |
New |
Alipurduar RWS Sub-Division |
Alipurduar RWS,Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte. |
Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda),RWS Alipurduar - I Block |
10/01/2023 |
27/03/2023 |
31/07/2025 |
29/12/2025 |
11 |
684 |
510.99 |
268.41 |
65 |
53 |
| 173 |
Alipurduar Division |
ALIPURDUAR |
Kalchini |
BHATKHAWA TEA GARDEN PIPED WATER SUPPLY SCHEME,SM/14211 |
New |
Alipurduar Sadar Sub-Division |
Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte.,HQ-A.E |
Alipurduar Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) |
10/01/2023 |
01/03/2023 |
30/06/2025 |
29/12/2025 |
14 |
1,604 |
530.22 |
186.91 |
78 |
35 |
| 174 |
Alipurduar Division |
ALIPURDUAR |
Kalchini |
BHATPARA TEA GARDEN PIPED WATER SUPPLY SCHEME,SM/14212 |
New |
Alipurduar RWS Sub-Division |
Alipurduar RWS,Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte. |
Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda),RWS Kalchini Block |
10/01/2023 |
31/01/2023 |
31/05/2025 |
29/12/2025 |
13 |
2,321 |
570.23 |
395.15 |
90 |
69 |
| 175 |
Alipurduar Division |
ALIPURDUAR |
Kalchini |
RANGAMATI TEA GARDEN PIPED WATER SUPPLY SCHEME,SM/14213 |
New |
Alipurduar Division |
Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte.,HQ-A.E |
Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda),RWS Kalchini Block |
10/01/2023 |
03/08/2023 |
30/06/2025 |
29/12/2025 |
13 |
2,268 |
740.97 |
164.10 |
50 |
22 |
| 176 |
Alipurduar Division |
ALIPURDUAR |
Kalchini |
BEECH TEA GARDEN PIPED WATER SUPPLY SCHEME,SM/14214 |
New |
Alipurduar Division |
Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte.,HQ-A.E |
Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda),RWS Kalchini Block |
10/01/2023 |
16/03/2023 |
31/05/2025 |
29/12/2025 |
12 |
1,579 |
527.26 |
442.23 |
90 |
84 |
| 177 |
Alipurduar Division |
ALIPURDUAR |
Madarihat |
GAROCHIRA BANDAPANI PIPED WATER SUPPLY SCHEME,SM/14216 |
New |
Birpara Sub-Division |
Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte.,Birpara A.E |
Birpara Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) |
10/01/2023 |
19/01/2023 |
31/05/2025 |
29/12/2025 |
6 |
130 |
129.41 |
86.64 |
93 |
67 |
| 178 |
Alipurduar Division |
ALIPURDUAR |
Madarihat |
DAKSHIN RANGALIBAZNA PIPED WATER SUPPLY SCHEME,SM/14217 |
New |
Birpara Sub-Division |
Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte.,Birpara A.E |
Birpara Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) |
10/01/2023 |
16/03/2023 |
31/05/2025 |
29/12/2025 |
11 |
794 |
409.38 |
192.27 |
60 |
47 |
| 179 |
Alipurduar Division |
ALIPURDUAR |
Alipurduar - II |
NURPUR PIPED WATER SUPPLY SCHEME.,SM/14218 |
New |
Alipurduar Sadar Sub-Division |
Alipurduar Sadar Sub Division,Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte. |
Alipurduar Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) |
10/01/2023 |
01/03/2023 |
31/05/2025 |
29/12/2025 |
12 |
423 |
451.36 |
208.76 |
93 |
46 |
| 180 |
Alipurduar Division |
ALIPURDUAR |
Alipurduar - II |
TURTURI PIPED WATER SUPPLY SCHEME.,SM/14219 |
New |
Alipurduar Sadar Sub-Division |
Alipurduar Sadar Sub Division,Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte. |
Alipurduar Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) |
10/01/2023 |
27/03/2023 |
31/07/2025 |
29/12/2025 |
20 |
1,003 |
948.08 |
436.64 |
75 |
46 |
| 181 |
Alipurduar Division |
ALIPURDUAR |
Alipurduar - I |
TORSHA FOREST PIPED WATER SUPPLY SCHEME,SM/14220 |
New |
Alipurduar RWS Sub-Division |
Alipurduar RWS,Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte. |
Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda),RWS Alipurduar - I Block |
10/01/2023 |
19/01/2023 |
31/05/2025 |
29/12/2025 |
6 |
201 |
142.14 |
95.99 |
90 |
68 |
| 182 |
Alipurduar Division |
ALIPURDUAR |
Madarihat |
BALLALGURI PIPED WATER SUPPLY SCHEME,SM/14221 |
New |
Birpara Sub-Division |
Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte.,Birpara A.E |
Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda),RWS Madarihat - Birpara Block |
10/01/2023 |
01/03/2023 |
31/07/2025 |
29/12/2025 |
9 |
609 |
413.54 |
202.01 |
85 |
49 |
| 183 |
Alipurduar Division |
ALIPURDUAR |
Madarihat |
UTTAR RANGALIBAZNA PIPED WATER SUPPLY SCHEME,SM/14222 |
New |
Birpara Sub-Division |
Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte.,Birpara A.E |
Birpara Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) |
10/01/2023 |
27/03/2023 |
31/07/2025 |
29/12/2025 |
9 |
729 |
429.71 |
230.18 |
70 |
54 |
| 184 |
Alipurduar Division |
ALIPURDUAR |
Kumargram |
PAKRIGURI PIPED WAYER SUPPLY SCHEME.,SM/14223 |
New |
Alipurduar Sadar Sub-Division |
Alipurduar Sadar Sub Division,Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte. |
Alipurduar Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) |
10/01/2023 |
31/03/2023 |
31/10/2025 |
29/12/2025 |
19 |
603 |
509.75 |
165.83 |
55 |
33 |
| 185 |
Alipurduar Division |
ALIPURDUAR |
Madarihat |
AUGMENTATION OF BIRPARA WATER SUPPLY SCHEME,SM/14233 |
Augmentation |
Birpara Sub-Division |
Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte.,Birpara A.E |
Birpara Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) |
11/01/2023 |
17/01/2023 |
30/06/2025 |
29/12/2025 |
48 |
18,867 |
2,288.93 |
983.90 |
65 |
43 |
| 186 |
Alipurduar Division |
ALIPURDUAR |
Falakata |
MAIRADANGA PIPED WATER SUPPLY SCHEME,SM/15206 |
New |
Birpara Sub-Division |
Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte.,Birpara A.E |
Birpara Sub Division,Junior Engineer 2, Cooch-Behar Mechanical Sub-Division, PHE Dte.(Gourab Mallick) |
07/02/2023 |
16/05/2023 |
31/05/2025 |
29/12/2025 |
13 |
3,541 |
963.71 |
472.76 |
70 |
49 |
| 187 |
Alipurduar Division |
ALIPURDUAR |
Falakata |
PASCHIM DEOGAON PIPED WATER SUPPLY SCHEME,SM/15207 |
New |
Birpara Sub-Division |
Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte.,Birpara A.E |
Birpara Sub Division,Junior Engineer 2, Cooch-Behar Mechanical Sub-Division, PHE Dte.(Gourab Mallick) |
07/02/2023 |
20/07/2023 |
31/12/2025 |
29/12/2025 |
13 |
2,097 |
802.95 |
301.89 |
65 |
38 |
| 188 |
Alipurduar Division |
ALIPURDUAR |
Falakata |
DHANIRAMPUR PIPED WATER SUPPLY SCHEME,SM/15208 |
New |
Birpara Sub-Division |
Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte.,Birpara A.E |
Birpara Sub Division,Junior Engineer 2, Cooch-Behar Mechanical Sub-Division, PHE Dte.(Gourab Mallick) |
07/02/2023 |
31/03/2023 |
30/06/2025 |
29/12/2025 |
11 |
1,552 |
670.33 |
509.63 |
78 |
76 |
| 189 |
Alipurduar Division |
ALIPURDUAR |
Madarihat |
AUGMENTATION OF HANTUPARA TG PIPED WATER SUPPLY SCHEME.,SM/15209 |
Augmentation |
Birpara Sub-Division |
Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte.,Birpara A.E |
Birpara Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) |
07/02/2023 |
13/03/2023 |
30/06/2025 |
29/12/2025 |
5 |
0 |
112.19 |
42.47 |
80 |
38 |
| 190 |
Alipurduar Division |
ALIPURDUAR |
Madarihat |
AUGMENTATION OF DHUMCHIPARA TG PIPED WATER SUPPLY SCHEME.,SM/15210 |
Augmentation |
Birpara Sub-Division |
Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte.,Birpara A.E |
Birpara Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) |
07/02/2023 |
13/03/2023 |
31/07/2025 |
29/12/2025 |
7 |
0 |
111.32 |
40.11 |
60 |
36 |
| 191 |
Alipurduar Division |
ALIPURDUAR |
Kalchini |
KALCHINI TEA GARDEN AREA PIPED WATER SUPPLY SCHEME,SM/15482 |
New |
Alipurduar Division |
Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte.,HQ-A.E |
Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda),RWS Kalchini Block |
13/02/2023 |
01/03/2023 |
31/07/2025 |
29/12/2025 |
23 |
5,753 |
1,380.67 |
432.23 |
50 |
31 |
| 192 |
Alipurduar Division |
ALIPURDUAR |
Kumargram |
MADHYA KAMAKHYAGURI PIPED WATER SUPPLY SCHEME,SM/15517 |
New |
Alipurduar Sadar Sub-Division |
Alipurduar Sadar Sub Division,Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte. |
Alipurduar Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) |
16/02/2023 |
01/03/2023 |
31/05/2025 |
29/12/2025 |
18 |
1,645 |
1,067.02 |
601.53 |
83 |
56 |
| 193 |
Alipurduar Division |
ALIPURDUAR |
Alipurduar - II |
CHALNIPAK PIPED WATER SUPPLY SCHEME.,SM/15534 |
New |
Alipurduar Sadar Sub-Division |
Alipurduar Sadar Sub Division,Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte. |
Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda),RWS Madarihat - Birpara Block |
16/02/2023 |
01/03/2023 |
30/11/2025 |
29/12/2025 |
18 |
1,648 |
1,024.40 |
470.06 |
80 |
46 |
| 194 |
Alipurduar Division |
ALIPURDUAR |
Falakata |
NARASINGPUR PIPED WATER SUPPLY SCHEME,SM/15758 |
New |
Birpara Sub-Division |
Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte.,Birpara A.E |
Birpara Sub Division,Junior Engineer 2, Cooch-Behar Mechanical Sub-Division, PHE Dte.(Gourab Mallick) |
20/02/2023 |
20/07/2023 |
31/07/2025 |
29/12/2025 |
12 |
2,461 |
842.46 |
685.15 |
70 |
81 |
| 195 |
Alipurduar Division |
ALIPURDUAR |
Kalchini |
UTTAR BARAJHAR FOREST PIPE WATER SUPPLY SCHEME,SM/15914 |
New |
Alipurduar Division |
Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte.,HQ-A.E |
Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda),RWS Kalchini Block |
22/02/2023 |
24/04/2023 |
31/12/2025 |
29/12/2025 |
7 |
567 |
358.24 |
45.73 |
6 |
13 |
| 196 |
Alipurduar Division |
ALIPURDUAR |
Falakata |
UMACHARANPUR PIPED WATER SUPPLY SCHEME,SM/16114 |
New |
Birpara Sub-Division |
Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte.,Birpara A.E |
Birpara Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) |
22/02/2023 |
02/08/2023 |
02/08/2025 |
29/12/2025 |
13 |
3,053 |
950.07 |
388.99 |
50 |
41 |
| 197 |
Alipurduar Division |
ALIPURDUAR |
Alipurduar - I |
REJUVENATION OF SIDHABARI PIPED WATER SUPPLY SCHEME,SM/16115 |
Augmentation |
Birpara Sub-Division |
Alipurduar RWS |
Birpara Sub Division |
22/02/2023 |
31/01/2023 |
30/06/2025 |
29/12/2025 |
3 |
0 |
240.25 |
61.62 |
50 |
26 |
| 198 |
Alipurduar Division |
ALIPURDUAR |
Kalchini |
28&29 MILE BASTI PIPE WATER SUPPLY SCHEME,SM/16506 |
New |
Alipurduar Sadar Sub-Division |
Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte.,HQ-A.E |
Alipurduar Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) |
03/03/2023 |
23/03/2023 |
31/12/2025 |
29/12/2025 |
26 |
1,752 |
990.41 |
185.56 |
3 |
19 |
| 199 |
Alipurduar Division |
ALIPURDUAR |
Kalchini |
BUXA PIPE WATER SUPPLY SCHEME,SM/16507 |
New |
Alipurduar Sadar Sub-Division |
Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte.,HQ-A.E |
Alipurduar Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) |
03/03/2023 |
23/03/2023 |
31/12/2025 |
29/12/2025 |
8 |
219 |
219.61 |
16.34 |
2 |
7 |
| 200 |
Alipurduar Division |
ALIPURDUAR |
Kumargram |
PURBBA NARATHALI PIPED WATER SUPPLY SCHEME.,SM/16537 |
New |
Alipurduar Sadar Sub-Division |
Alipurduar Sadar Sub Division,Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte. |
Alipurduar Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) |
10/03/2023 |
27/03/2023 |
31/07/2025 |
29/12/2025 |
21 |
2,273 |
1,261.38 |
594.95 |
75 |
47 |
| 201 |
Alipurduar Division |
ALIPURDUAR |
Alipurduar - II |
UTTAR MAJID KHANA PIPED WATER SUPPLY SCHEME,SM/16538 |
New |
Alipurduar Sadar Sub-Division |
Alipurduar Sadar Sub Division,Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte. |
Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda),RWS Alipurduar - II Block |
10/03/2023 |
17/03/2023 |
31/07/2025 |
29/12/2025 |
16 |
1,888 |
1,074.69 |
443.78 |
70 |
41 |
| 202 |
Alipurduar Division |
ALIPURDUAR |
Kalchini |
UTTAR MANDABARI PIPED WATER SUPPLY SCHEME,SM/16539 |
New |
Alipurduar Division |
Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte.,HQ-A.E |
Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda),RWS Kalchini Block |
10/03/2023 |
28/07/2023 |
31/07/2025 |
29/12/2025 |
16 |
2,329 |
1,121.63 |
676.44 |
75 |
60 |
| 203 |
Alipurduar Division |
ALIPURDUAR |
Falakata |
MALSAGAON PIPED WATER SUPPLY SCHEME,SM/16818 |
New |
Birpara Sub-Division |
Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte.,Birpara A.E |
Birpara Sub Division,Junior Engineer 2, Cooch-Behar Mechanical Sub-Division, PHE Dte.(Gourab Mallick) |
13/03/2023 |
02/08/2023 |
02/08/2025 |
29/12/2025 |
10 |
1,481 |
777.46 |
590.00 |
70 |
76 |
| 204 |
Alipurduar Division |
ALIPURDUAR |
Falakata |
LACHHIMANDABRI PIPED WATER SUPPLY SCHEME,SM/16819 |
New |
Birpara Sub-Division |
Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte.,Birpara A.E |
Birpara Sub Division,Junior Engineer 2, Cooch-Behar Mechanical Sub-Division, PHE Dte.(Gourab Mallick) |
13/03/2023 |
03/08/2023 |
31/05/2025 |
29/12/2025 |
11 |
1,272 |
658.29 |
356.45 |
60 |
54 |
| 205 |
Alipurduar Division |
ALIPURDUAR |
Falakata |
BENGKANDI PIPED WATER SUPPLY SCHEME,SM/16820 |
New |
Birpara Sub-Division |
Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte.,Birpara A.E |
Birpara Sub Division,Junior Engineer 2, Cooch-Behar Mechanical Sub-Division, PHE Dte.(Gourab Mallick) |
13/03/2023 |
28/07/2023 |
31/05/2025 |
29/12/2025 |
12 |
2,074 |
964.09 |
563.39 |
60 |
58 |
| 206 |
Alipurduar Division |
ALIPURDUAR |
Falakata |
DALMONI TEA GARDEN PIPED WATER SUPPLY SCHEME,SM/16821 |
New |
Birpara Sub-Division |
Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte.,Birpara A.E |
Birpara Sub Division,Junior Engineer 2, Cooch-Behar Mechanical Sub-Division, PHE Dte.(Gourab Mallick) |
13/03/2023 |
31/03/2023 |
31/07/2025 |
29/12/2025 |
9 |
442 |
405.28 |
37.03 |
25 |
9 |
| 207 |
Alipurduar Division |
ALIPURDUAR |
Falakata |
TASTI TEA GARDEN PIPED WATER SUPPLY SCHEME.,SM/16822 |
New |
Birpara Sub-Division |
Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte.,Birpara A.E |
Birpara Sub Division,Junior Engineer 2, Cooch-Behar Mechanical Sub-Division, PHE Dte.(Gourab Mallick) |
13/03/2023 |
12/07/2023 |
31/07/2025 |
29/12/2025 |
13 |
1,184 |
569.65 |
158.73 |
60 |
28 |
| 208 |
Alipurduar Division |
ALIPURDUAR |
Falakata |
DALGAON TEA GARDEN PIPED WATER SUPPLY SCHEME.,SM/16823 |
New |
Birpara Sub-Division |
Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte.,Birpara A.E |
Birpara Sub Division,Junior Engineer 2, Cooch-Behar Mechanical Sub-Division, PHE Dte.(Gourab Mallick) |
13/03/2023 |
31/03/2023 |
31/12/2025 |
29/12/2025 |
13 |
1,298 |
739.67 |
284.30 |
75 |
38 |
| 209 |
Alipurduar Division |
ALIPURDUAR |
Madarihat |
AUGMENTATION OF GARGENDA TG PIPED WATER SUPPLY SCHEME.,SM/16824 |
Augmentation |
Birpara Sub-Division |
Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte.,Birpara A.E |
Birpara Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) |
13/03/2023 |
22/03/2023 |
30/06/2025 |
29/12/2025 |
13 |
0 |
273.66 |
116.15 |
72 |
42 |
| 210 |
Alipurduar Division |
ALIPURDUAR |
Falakata |
Khagenhat Piped Water Supply Scheme,SM/18151 |
New |
Birpara Sub-Division |
Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte.,Birpara A.E |
Birpara Sub Division,Junior Engineer 2, Cooch-Behar Mechanical Sub-Division, PHE Dte.(Gourab Mallick) |
29/03/2023 |
04/05/2023 |
31/05/2025 |
29/12/2025 |
13 |
2,057 |
822.98 |
298.23 |
60 |
36 |
| 211 |
Alipurduar Division |
ALIPURDUAR |
Kumargram |
Chengmari Piped Water Supply Scheme,SM/18152 |
New |
Alipurduar Sadar Sub-Division |
Alipurduar Sadar Sub Division,Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte. |
Alipurduar Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) |
29/03/2023 |
04/05/2023 |
31/07/2025 |
29/12/2025 |
12 |
1,699 |
772.15 |
414.19 |
65 |
54 |
| 212 |
Alipurduar Division |
ALIPURDUAR |
Kumargram |
Dhantali Piped Water Supply Scheme,SM/18153 |
New |
Alipurduar Sadar Sub-Division |
Alipurduar Sadar Sub Division,Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte. |
Alipurduar Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) |
29/03/2023 |
04/05/2023 |
31/07/2025 |
29/12/2025 |
6 |
206 |
285.56 |
147.02 |
70 |
51 |
| 213 |
Alipurduar Division |
ALIPURDUAR |
Alipurduar - II |
Uttar Dhalkar Piped Water Supply Scheme,SM/18154 |
New |
Alipurduar Sadar Sub-Division |
Alipurduar Sadar Sub Division,Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte. |
Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda),RWS Alipurduar - II Block |
29/03/2023 |
04/05/2023 |
30/06/2025 |
29/12/2025 |
6 |
594 |
404.14 |
184.16 |
70 |
46 |
| 214 |
Alipurduar Division |
ALIPURDUAR |
Kalchini |
Bhutri Forest Piped Water Supply Scheme,SM/18156 |
New |
Alipurduar Division |
Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte.,HQ-A.E |
Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda),RWS Kalchini Block |
29/03/2023 |
18/04/2023 |
31/05/2025 |
29/12/2025 |
4 |
48 |
59.54 |
20.00 |
95 |
34 |
| 215 |
Alipurduar Division |
ALIPURDUAR |
Alipurduar - II |
Purbba Majherdabri Tea Garden Area Piped Water Supply Scheme,SM/18157 |
New |
Alipurduar Sadar Sub-Division |
Alipurduar Sadar Sub Division,Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte. |
Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda),RWS Alipurduar - II Block |
29/03/2023 |
22/05/2023 |
31/12/2025 |
29/12/2025 |
5 |
1,538 |
360.16 |
180.69 |
70 |
50 |
| 216 |
Alipurduar Division |
ALIPURDUAR |
Alipurduar - I |
Parpatla Khawa Piped Water Supply Scheme,SM/18158 |
New |
Alipurduar RWS Sub-Division |
Alipurduar RWS,Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte. |
Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda),RWS Alipurduar - I Block |
29/03/2023 |
04/05/2023 |
31/07/2025 |
29/12/2025 |
6 |
189 |
187.87 |
90.33 |
68 |
48 |
| 217 |
Alipurduar Division |
ALIPURDUAR |
Falakata |
AUGMENTATION OF DALIMPUR PWSS,SM/18254 |
Augmentation |
|
|
|
21/06/2023 |
12/07/2023 |
31/10/2025 |
29/12/2025 |
20 |
4,067 |
1,020.25 |
557.21 |
70 |
55 |