Sl. No. Division District Block Scheme Name Scheme Category Sub Division Name of AE entrusted Name of JE entrusted Date of Sanction Date of Commencement Target Date of Completion Date Of Updation Work Order Issued FHTCs Sanctioned Cost Payment Physical Progress (in %) Financial Progress (in %)
65 0 69,158 29,422.75 0   0
1 South 24 Pgs. W/S Division - I SOUTH 24 PARGANAS Budge Budge-I Retrofitting of distribution System For Buita W/S Scheme for Booth No:197 to 198 and Adjoining Areas under Budge Budge-I Block,SM/07014 Retrofitting Sub-Division - I under South 24 W/s Division - I AE SWSD-I 18/11/2020 23/11/2020 31/03/2025 25/03/2024 0 696 28.30 0.00 88 0
2 South 24 Pgs. W/S Division - I SOUTH 24 PARGANAS Budge Budge-I Retrofitting of distribution System For Buita W/S Scheme for Booth No:186 to 190 and 192 and 196 and Adjoining Areas under Budge Budge-I Block,SM/07015 Retrofitting Sub-Division - I under South 24 W/s Division - I AE SWSD-I 18/11/2020 14/12/2020 31/03/2025 25/03/2024 0 1,949 95.42 0.00 89 0
3 South 24 Pgs. W/S Division - I SOUTH 24 PARGANAS Budge Budge-I Retrofitting of distribution System For Buita W/S Scheme for Booth No:137 to 140 and Adjoining Areas under Budge Budge-I Block,SM/07016 Retrofitting Sub-Division - I under South 24 W/s Division - I AE SWSD-I 18/11/2020 14/12/2020 31/03/2025 25/03/2024 0 2,227 98.72 0.00 89 0
4 South 24 Pgs. W/S Division - I SOUTH 24 PARGANAS Budge Budge-I Retrofitting of distribution System For Buita W/S Scheme for Booth No:141 to 144 and Adjoining Areas under Budge Budge-I Block,SM/07017 Retrofitting Sub-Division - I under South 24 W/s Division - I AE SWSD-I 18/11/2020 14/12/2020 31/03/2025 25/03/2024 0 2,088 96.57 0.00 89 0
5 South 24 Pgs. W/S Division - I SOUTH 24 PARGANAS Budge Budge-I Retrofitting of distribution System For Nischintipur W/S Scheme for Nischintipur Mouza near Head Work Site and Adjoining Areas under Budge Budge-I Block,SM/07018 Retrofitting Sub-Division - I under South 24 W/s Division - I AE SWSD-I 18/11/2020 12/08/2020 31/03/2025 25/03/2024 0 1,500 94.23 0.00 100 0
6 South 24 Pgs. W/S Division - I SOUTH 24 PARGANAS Budge Budge-I Retrofitting of distribution System For Nandarampur W/S Scheme for Chak Nabashan Mouza and adjoining areas under Budge Budge-I Block,SM/07019 Retrofitting Sub-Division - I under South 24 W/s Division - I AE SWSD-I 18/11/2020 23/11/2020 31/03/2025 25/03/2024 0 640 26.02 0.00 89 0
7 South 24 Pgs. W/S Division - I SOUTH 24 PARGANAS Budge Budge-I Retrofitting of distribution System For Nandarampur W/S Scheme for Booth No:170 and Adjoining Areas under Budge Budge-I Block,SM/07020 Retrofitting Sub-Division - I under South 24 W/s Division - I AE SWSD-I 18/11/2020 12/11/2020 31/03/2025 25/03/2024 0 1,800 94.56 0.00 88 0
8 South 24 Pgs. W/S Division - I SOUTH 24 PARGANAS Budge Budge-I Retrofitting of distribution System For Uttar Roypur W/S Scheme for Uttar Roypur Balarampur (Part), Chak Nabashan (Part) Mouza under Budge Budge-I Block with allied works,SM/07050 Retrofitting Sub-Division - I under South 24 W/s Division - I AE SWSD-I 25/11/2020 12/11/2020 31/03/2025 25/03/2024 0 2,183 88.77 0.00 88 0
9 South 24 Pgs. W/S Division - I SOUTH 24 PARGANAS Budge Budge-I Providing Functional Household Tap Connection for Atmarampur W/S Scheme for Atmarampur,Chingripota and Santoshpur Mouza under Budge Budge-I Block with allied works under Surface Water Based Water Supply Scheme for Falta-Mathurapur.,SM/07051 Retrofitting Sub-Division - I under South 24 W/s Division - I AE SWSD-I 25/11/2020 12/08/2020 31/03/2025 25/03/2024 0 1,627 99.79 0.00 89 0
10 South 24 Pgs. W/S Division - I SOUTH 24 PARGANAS Budge Budge-I Providing Functional Household Tap Connection for Betuabati W/S Scheme under Budge Budge-I Block with allied works under Surface Water Based Water Supply Scheme for Falta-Mathurapur,SM/07052 Retrofitting Sub-Division - I under South 24 W/s Division - I AE SWSD-I 25/11/2020 18/12/2020 31/03/2025 25/03/2024 0 1,090 68.39 0.00 88 0
11 South 24 Pgs. W/S Division - I SOUTH 24 PARGANAS Budge Budge-I Retrofitting of distribution System For Uttar Roypur W/S Scheme for Booth No:153 to 169 under Budge Budge-I Block with allied works,SM/07053 Retrofitting Sub-Division - I under South 24 W/s Division - I AE SWSD-I 25/11/2020 12/11/2020 31/03/2025 25/03/2024 0 1,637 99.78 0.00 88 0
12 South 24 Pgs. W/S Division - I SOUTH 24 PARGANAS Budge Budge-I Retrofitting of distribution System For Uttar Roypur W/S Scheme for Booth No:145 to 152 under Budge Budge-I Block with allied works,SM/07054 Retrofitting Sub-Division - I under South 24 W/s Division - I AE SWSD-I 25/11/2020 12/08/2020 31/03/2025 25/03/2024 0 1,910 99.29 0.00 89 0
13 South 24 Pgs. W/S Division - I SOUTH 24 PARGANAS Budge Budge-I Retrofitting of distribution System For Moukhali W/S Scheme for Durgapur Moukhali and Jagatballavpur under Budge Budge-I Block with allied works,SM/07055 Retrofitting Sub-Division - I under South 24 W/s Division - I AE SWSD-I 25/11/2020 14/12/2020 31/03/2025 25/03/2024 0 1,550 99.25 0.00 89 0
14 South 24 Pgs. W/S Division - I SOUTH 24 PARGANAS Budge Budge-I Retrofitting of distribution System For Jamalpur W/S Scheme for habitations of Jamalpur Mouza and adjoining areas under Budge Budge-I Block with allied works,SM/07056 Retrofitting Sub-Division - I under South 24 W/s Division - I AE SWSD-I 25/11/2020 14/12/2020 31/03/2025 25/03/2024 0 1,286 82.14 0.00 89 0
15 South 24 Pgs. W/S Division - I SOUTH 24 PARGANAS Baruipur Improvement of W/S by interconnection from existing big dia TW and laying distribution system with CIDF, UPVC pipes including providing FHTC by retrofitting of scheme Improvement of WS [Phase-III] in Baruipur and Mograhat-II Block of Sankarpur-II GP withi,SM/08182 Retrofitting Baruipur Sub-Division AE BSD 09/02/2021 07/07/2021 31/03/2025 25/03/2024 0 1,497 200.38 0.00 92 0
16 South 24 Pgs. W/S Division - I SOUTH 24 PARGANAS Emergency restoration of Different damaged components for Pipe Water Supply Schemes at various zones under South 24 Parganas Water Supply Division-I, PHE Dte. Caused due to Super Cyclone AMPHAN on 20th May in the district of south 24 Parganas,SM/09020 Disaster 30/10/2021 30/10/2021 31/03/2025 25/03/2024 0 0 650.96 0.00 95 0
17 South 24 Pgs. W/S Division - I SOUTH 24 PARGANAS Budge Budge-I Retrofitting of pipeline for supporting FHTC drive for Uttar Roypur W/S Scheme for Booth 153 to 169 under Budge Budge I Block with allied works under SWD - I, P.H.E. Dte ,SM/09944 Retrofitting Baruipur Sub-Division AE BSD 14/12/2021 11/02/2021 31/07/2025 25/03/2024 0 40 135.17 0.00 88 0
18 South 24 Pgs. W/S Division - I SOUTH 24 PARGANAS Budge Budge-I Retrofitting of pipeline for supporting FHTC drive for Uttar Roypur W/S Scheme for Booth 145 to 152 under Budge Budge I Block with allied works under SWD - I, P.H.E. Dte District South 24 Parganas.,SM/09945 Retrofitting Sub-Division - I under South 24 W/s Division - I AE SWSD-I 14/12/2021 11/02/2021 31/07/2025 25/03/2024 0 440 163.90 0.00 88 0
19 South 24 Pgs. W/S Division - I SOUTH 24 PARGANAS Budge Budge-I Retrofitting of pipeline for supporting FHTC drive for Uttar Roypur W/S Scheme for Uttar Roypur, Balarampur (Part) and Chak Nabasan (Part) under SWD - I, P.H.E. Dte District South 24 Parganas.,SM/09946 Retrofitting Sub-Division - I under South 24 W/s Division - I AE SWSD-I 14/12/2021 11/02/2021 31/07/2025 25/03/2024 0 50 157.01 0.00 88 0
20 South 24 Pgs. W/S Division - I SOUTH 24 PARGANAS Budge Budge-I Retrofitting of pipeline for supporting FHTC drive for under Atmarampur W/S Scheme for Atmarampur, Chingripota and Santoshpur mouza including Balarampur Mouza under Budge Budge I Block with allied works under SWD - I, P.H.E. Dte District South 24 Parganas,SM/09947 Retrofitting Sub-Division - I under South 24 W/s Division - I AE SWSD-I 14/12/2021 11/02/2021 31/03/2025 25/03/2024 0 1,526 163.78 0.00 89 0
21 South 24 Pgs. W/S Division - I SOUTH 24 PARGANAS Budge Budge-I Retrofitting of pipeline for supporting FHTC drive for Betuabati W/S Scheme and adjoining areas under Budge Budge I Block with allied works under SWD - I, P.H.E. Dte District South 24 Parganas.,SM/09948 Retrofitting Sub-Division - I under South 24 W/s Division - I AE SWSD-I 14/12/2021 25/10/2021 30/11/2025 25/03/2024 0 200 64.96 0.00 88 0
22 South 24 Pgs. W/S Division - I SOUTH 24 PARGANAS Budge Budge-I Retrofitting of pipeline for supporting FHTC drive for Jamalpur W/S Scheme and adjoining areas under Budge Budge I Block with allied works under SWD - I, P.H.E. Dte District South 24 Parganas.,SM/09949 Retrofitting Baruipur Sub-Division AE BSD 14/12/2021 25/10/2021 30/11/2025 25/03/2024 0 200 100.01 0.00 89 0
23 South 24 Pgs. W/S Division - I SOUTH 24 PARGANAS Budge Budge-I Retrofitting of pipeline for supporting FHTC drive for Moukhali W/S Scheme and adjoining areas under Budge Budge I Block with allied works under SWD - I, P.H.E. Dte District South 24 Parganas.,SM/09950 Retrofitting Sub-Division - I under South 24 W/s Division - I AE SWSD-I 14/12/2021 25/10/2021 31/03/2025 25/03/2024 0 394 89.53 0.00 88 0
24 South 24 Pgs. W/S Division - I SOUTH 24 PARGANAS Budge Budge-I Retrofitting of pipeline for supporting FHTC drive for Nischintipur W/S Scheme and adjoining areas under Budge Budge I Block with allied works under SWD - I, P.H.E. Dte ,SM/09951 Retrofitting Sub-Division - I under South 24 W/s Division - I AE SWSD-I 14/12/2021 25/10/2021 31/03/2025 25/03/2024 0 250 91.19 0.00 89 0
25 South 24 Pgs. W/S Division - I SOUTH 24 PARGANAS Budge Budge-I Retrofitting of pipeline for supporting FHTC drive for Nandarampur W/S Scheme and adjoining areas under Budge Budge I Block with allied works under SWD - I, P.H.E. Dte District South 24 Parganas.,SM/09952 Retrofitting Sub-Division - I under South 24 W/s Division - I AE SWSD-I 14/12/2021 25/10/2021 31/03/2025 25/03/2024 0 200 65.43 0.00 89 0
26 South 24 Pgs. W/S Division - I SOUTH 24 PARGANAS Budge Budge-I Retrofitting of pipeline for supporting FHTC drive for Buita W/S Scheme (For Booth No: 197 to 198) and adjoining areas under Budge Budge I Block with allied works under SWD - I, P.H.E. Dte District South 24 Parganas.,SM/09953 Retrofitting Sub-Division - I under South 24 W/s Division - I AE SWSD-I 14/12/2021 25/10/2021 31/03/2025 25/03/2024 0 506 42.18 0.00 88 0
27 South 24 Pgs. W/S Division - I SOUTH 24 PARGANAS Budge Budge-I Retrofitting of pipeline for supporting FHTC drive for Buita W/S Scheme (For Booth No:137 to 140) and adjoining areas under Budge Budge I Block with allied works under SWD - I, P.H.E. Dte District South 24 Parganas.,SM/09954 Retrofitting Sub-Division - I under South 24 W/s Division - I AE SWSD-I 14/12/2021 11/02/2021 31/03/2025 25/03/2024 0 118 287.71 0.00 88 0
28 South 24 Pgs. W/S Division - I SOUTH 24 PARGANAS Budge Budge-I Retrofitting of pipeline for supporting FHTC drive for Buita W/S Scheme (For Booth No: 186 to 190 & 192 to 196) and adjoining areas under Budge Budge I Block with allied works under SWD - I, P.H.E. Dte District South 24 Parganas.,SM/09955 Retrofitting Sub-Division - I under South 24 W/s Division - I AE SWSD-I 14/12/2021 11/02/2021 31/07/2025 25/03/2024 0 96 290.16 0.00 89 0
29 South 24 Pgs. W/S Division - I SOUTH 24 PARGANAS Budge Budge-I Retrofitting of pipeline for supporting FHTC drive for Buita W/S Scheme (For Booth No: 141 to 144 ) and adjoining areas under Budge Budge I Block with allied works under SWD - I, P.H.E. Dte District South 24 Parganas.,SM/09956 Retrofitting Sub-Division - I under South 24 W/s Division - I AE SWSD-I 14/12/2021 11/02/2021 31/03/2025 25/03/2024 0 80 299.18 0.00 89 0
30 South 24 Pgs. W/S Division - I SOUTH 24 PARGANAS RUNNING WATER SUPPLY ARRANGEMENT FOR GOVT INSTITUTIONS (SCHOOL/ AWC/ HEALTH CENTRE) 209 NOS IN BISHNUPUR-I & II BLOCKS 0F SOUTH 24-PARGANAS DISTRICT UNDER SOUTH 24-PARGANAS WATER SUPPLY DIVISION-I, PHE DTE.,SM/10113 School Sub-Division - II under South 24pgs W/s Division - I AE SWSD-II 08/02/2022 15/02/2022 30/06/2025 25/03/2024 0 0 934.61 0.00 95 0
31 South 24 Pgs. W/S Division - I SOUTH 24 PARGANAS RUNNING WATER SUPPLY ARRAGEMENT FOR GOVT INSTITUTIONS (SCHOOL/ AWC/ HEALTH CENTRE) 197 NOSIN BARUIPUR AND BUDGE BUDGE-I BLOCKS 0F SOUTH 24-PARGANAS DISTRICT UNDER SOUTH 24-PARGANAS WATER SUPPLY DIVISION-I, PHE DTE.,SM/10114 School Sub-Division - I under South 24 W/s Division - I AE BSD,AE SWSD-I 08/02/2022 15/02/2022 31/03/2025 25/03/2024 0 0 798.04 0.00 95 0
32 South 24 Pgs. W/S Division - I SOUTH 24 PARGANAS RUNNING WATER SUPPLY ARRAGEMENT FOR GOVT INSTITUTIONS (SCHOOL/ AWC/ HEALTH CENTRE) 218 NOS IN BUDGE BUDGE-II BLOCK 0F SOUTH 24-PARGANAS DISTRICT UNDER SOUTH 24-PARGANAS WATER SUPPLY DIVISION-I, PHE DTE.,SM/10115 School Sub-Division - I under South 24 W/s Division - I AE SWSD-I 08/02/2022 15/02/2022 31/03/2025 25/03/2024 0 0 762.86 0.00 95 0
33 South 24 Pgs. W/S Division - I SOUTH 24 PARGANAS RUNNING WATER SUPPLY ARRAGEMENT FOR GOVT INSTITUTIONS (SCHOOL/ AWC/ HEALTH CENTRE) 208 NOS IN JOYNAGAR-I AND THAKURPUKUR MAHESHTALA BLOCKS 0F SOUTH 24-PARGANAS DISTRICT UNDER SOUTH 24-PARGANAS WATER SUPPLY DIVISION-I, PHE DTE.,SM/10116 School Sub-Division - I under South 24 W/s Division - I AE BSD,AE SWSD-I 08/02/2022 03/01/2022 30/06/2025 25/03/2024 0 0 879.72 0.00 95 0
34 South 24 Pgs. W/S Division - I SOUTH 24 PARGANAS RUNNING WATER SUPPLY ARRAGEMENT FOR GOVT INSTITUTIONS (SCHOOL/ AWC/ HEALTH CENTRE) 181 NOS IN SONARPUR AND MOGRAHAT-II BLOCKS 0F SOUTH 24-PARGANAS DISTRICT UNDER SOUTH 24-PARGANAS WATER SUPPLY DIVISION-I, PHE DTE.,SM/10117 School South 24 Pgs. W/S Division - I AE BSD,AE HQ-I 08/02/2022 15/02/2022 31/07/2025 25/03/2024 0 0 663.13 0.00 95 0
35 South 24 Pgs. W/S Division - I SOUTH 24 PARGANAS RUNNING WATER SUPPLY ARRAGEMENT FOR GOVT INSTITUTIONS (SCHOOL/ AWC) 225 NOS IN DURGAPUR, CH-I, CH-II, SANKSAHAR, BODRE AND TARDAH GPS OF BHANGAR-I BLOCK (CANNING PURBA A.C.) 0F SOUTH 24-PARGANAS DISTRICT UNDER SOUTH 24-PARGANAS WATER SUPPLY DIVISION-I, PH,SM/10118 School South 24 Pgs. W/S Division - I AE HQ-I 08/02/2022 15/02/2022 31/03/2025 25/03/2024 0 0 967.94 0.00 95 0
36 South 24 Pgs. W/S Division - I SOUTH 24 PARGANAS RUNNING WATER SUPPLY ARRAGEMENT FOR GOVT INSTITUTIONS (SCHOOL/ AWC ) 132 NOS IN JAGULGACHI, PRANGANJ AND NARAYANPUR GPS OF BHANGAR-I BLOCK (BHANGAR A.C.) 0F SOUTH 24-PARGANAS DISTRICT UNDER SOUTH 24-PARGANAS WATER SUPPLY DIVISION-I, PHE DTE.,SM/10119 School South 24 Pgs. W/S Division - I AE HQ-I 08/02/2022 15/02/2022 31/03/2025 25/03/2024 0 0 546.43 0.00 95 0
37 South 24 Pgs. W/S Division - I SOUTH 24 PARGANAS Upgradation and accreditation of Bacteriological testing scope of State Level Laboratory at Dakshin Roypur WTP campus with allied works (As per ISO/IEC 17025:2017) under S-24Pgns W/S Divn-I (Phase-I),SM/10197 Support Sub-Division - I under South 24 W/s Division - I AE SWSD-I 14/01/2022 31/07/2023 31/03/2024 13/12/2023 0 0 106.68 0.00 90 0
38 South 24 Pgs. W/S Division - I SOUTH 24 PARGANAS Baruipur Ground water based piped water supply scheme at Chitrasali (Chitrasali,J.L-112), Baruipur Block under South 24 Parganas dist,SM/11295 New Baruipur Sub-Division AE BSD,Assistant Engineer Junior Engineer 28/06/2022 09/08/2022 31/03/2025 25/03/2024 0 520 149.12 0.00 81 0
39 South 24 Pgs. W/S Division - I SOUTH 24 PARGANAS Budge Budge-II Providing FHTC with allied works for Zone 1, Zone 3 & Zone 5 of Budge Budge-II under South 24 pgs. W/S Division-I, PHED, Dist.-South 24 pgs.,SM/11487 New South 24 Pgs Mechanical Division AE SWSD-I,Assistant Engineer -II Junior Engineer 15/07/2022 22/09/2022 30/12/2025 25/03/2024 0 2,630 792.98 0.00 89 0
40 South 24 Pgs. W/S Division - I SOUTH 24 PARGANAS Thakurpukur Mahestola Piped water supply scheme including FHTC for Chatta GP in Thakurpukur Maheshtala Block under South 24 pgs. W/S Division-I, PHE Dte.,SM/11488 New Sub-Division - I under South 24 W/s Division - I AE SWSD-I 15/07/2022 08/08/2022 31/03/2025 25/03/2024 0 7,460 999.64 0.00 89 0
41 South 24 Pgs. W/S Division - I SOUTH 24 PARGANAS Bishnupur-I Proposed ground water based PANAKUA piped water supply scheme to accommodate FHTC in BISHNUPUR-I Block under South 24 pgns W/S Division-I, South 24 Parganas District.,SM/11494 New South 24 Pgs Mechanical Division AE SWSD-II,Assistant Engineer -II JE1,Junior Engineer 19/07/2022 21/09/2022 31/12/2025 25/03/2024 0 983 491.24 0.00 83 0
42 South 24 Pgs. W/S Division - I SOUTH 24 PARGANAS Baruipur Ground water based DHANBERIA piped water supply scheme to accommodate FHTC in BARUIPUR block under South 24 Parganas W/S Division-I, PHE Dte for AUGMENTATION of surface water based W/S scheme in the Arsenic Affected Areas of South 24 Parganas district.,SM/12054 Augmentation Baruipur Sub-Division AE BSD,Assistant Engineer Junior Engineer 01/09/2022 17/09/2022 30/06/2025 25/03/2024 0 209 312.87 0.00 85 0
43 South 24 Pgs. W/S Division - I SOUTH 24 PARGANAS Baruipur Ground water based DAKSHIN SASAN (P) piped water supply scheme to accommodate FHTC in BARUIPUR block under South 24 Parganas W/S Division-I, PHE Dte for AUGMENTATION of surface water based W/S scheme in the Arsenic Affected Areas of South 24 Parganas.,SM/12057 Augmentation Baruipur Sub-Division AE BSD,Assistant Engineer JE-2,Junior Engineer 01/09/2022 08/10/2022 30/09/2025 25/03/2024 0 1,759 736.18 0.00 85 0
44 South 24 Pgs. W/S Division - I SOUTH 24 PARGANAS Baruipur Ground water based Tripura Nagar (RAMGOPALPUR) piped water supply scheme to accommodate FHTC in BARUIPUR block under South 24 Parganas W/S Division-I, PHE Dte for AUGMENTATION of surface water based W/S scheme in the Arsenic Affected Areas of South 24 Par,SM/12058 Augmentation South 24Pgs.Mechanical Sub-Division AE BSD,Assistant Engineer JE-1,Junior Engineer 01/09/2022 13/09/2022 31/08/2025 25/03/2024 0 494 237.52 0.00 85 0
45 South 24 Pgs. W/S Division - I SOUTH 24 PARGANAS Baruipur Ground water based KESHABPUR piped water supply scheme to accommodate FHTC in BARUIPUR block under South 24 Parganas W/S Division-I, PHE Dte for AUGMENTATION of surface water based W/S scheme in the Arsenic Affected Areas of South 24 Parganas.,SM/12059 Augmentation South 24Pgs.Mechanical Sub-Division AE BSD,Assistant Engineer JE-2,Junior Engineer 01/09/2022 08/10/2022 31/12/2025 25/03/2024 0 591 511.47 0.00 88 0
46 South 24 Pgs. W/S Division - I SOUTH 24 PARGANAS Baruipur Ground water based INDRAPALLA piped water supply scheme to accommodate FHTC in BARUIPUR block under South 24 Parganas W/S Division-I, PHE Dte for AUGMENTATION of surface water based W/S scheme in the Arsenic Affected Areas of South 24 Parganas.,SM/12264 Augmentation South 24Pgs.Mechanical Sub-Division AE BSD,Assistant Engineer JE-2,Junior Engineer 06/09/2022 08/10/2022 31/12/2025 25/03/2024 0 1,009 532.77 0.00 82 0
47 South 24 Pgs. W/S Division - I SOUTH 24 PARGANAS Budge Budge-I Repair And Replacement Of Tube Well Zones Of Different Water Supply Schemes Under Budge Budge I Under South 24 Pgs W/S Division-I, PHE Dte, Dist. South 24 Pgs.,SM/12884 Augmentation South 24 Pgs Mechanical Division AE SWSD-I,Assistant Engineer -II Junior Engineer 23/09/2022 16/11/2022 31/05/2025 25/03/2024 0 0 179.46 0.00 89 0
48 South 24 Pgs. W/S Division - I SOUTH 24 PARGANAS Budge Budge-II Ground water based HAORI piped water supply scheme to accommodate FHTC in BUDGE BUDGE - II block under South 24 Parganas W/S Division-I, South 24 Parganas District for AUGMENTATION of surface water based Water Supply scheme in the Arsenic Affected Areas ,SM/13297 Augmentation South 24 Pgs Mechanical Division AE SWSD-I,Assistant Engineer -II Junior Engineer 17/10/2022 19/12/2022 30/06/2025 25/03/2024 0 669 167.20 0.00 89 0
49 South 24 Pgs. W/S Division - I SOUTH 24 PARGANAS Baruipur Ground water based NABAGRAM piped water supply scheme to accommodate FHTC in BARUIPUR block under South 24 Parganas W/S Division-I, PHE Dte for AUGMENTATION of surface water based W/S scheme in the Arsenic Affected Areas of South 24 Parganas district.,SM/13311 Augmentation South 24Pgs.Mechanical Sub-Division AE BSD,Assistant Engineer JE-1,Junior Engineer 17/10/2022 03/01/2023 31/03/2025 25/03/2024 0 2,040 719.78 0.00 83 0
50 South 24 Pgs. W/S Division - I SOUTH 24 PARGANAS Sonarpur SAHEBPUR piped water supply scheme to accommodate FHTC in SONARPUR block under South 24 Parganas W/S Division-I for AUGMENTATION of surface water based W/S scheme in the Arsenic Affected Areas of South 24 Parganas District Under JJM.,SM/13675 Augmentation South 24Pgs.Mechanical Sub-Division AE HQ-I,Assistant Engineer Junior Engineer 02/11/2022 12/01/2022 31/03/2025 25/03/2024 0 2,108 883.61 0.00 85 0
51 South 24 Pgs. W/S Division - I SOUTH 24 PARGANAS Sonarpur KANTIPOTA piped water supply scheme to accommodate FHTC in SONARPUR block under South 24 Parganas W/S Division-I for AUGMENTATION of surface water based W/S scheme in the Arsenic Affected Areas of South 24 Parganas District Under JJM,SM/13777 Augmentation South 24 Pgs. W/S Division - I AE HQ-I,Assistant Engineer Junior Engineer 18/11/2022 15/12/2022 30/09/2025 25/03/2024 0 1,783 981.49 0.00 85 0
52 South 24 Pgs. W/S Division - I SOUTH 24 PARGANAS Baruipur Ground water based BEJEORANCHA piped water supply scheme to accommodate FHTC in BARUIPUR block under South 24 Parganas W/S Division-I South 24 Parganas district for AUGMENTATION of surface water based W/S scheme in the Arsenic Affected Areas of South 24 P,SM/13917 Augmentation South 24Pgs.Mechanical Sub-Division AE BSD,Assistant Engineer Junior Engineer 29/11/2022 23/03/2023 31/03/2025 25/03/2024 0 620 286.90 0.00 81 0
53 South 24 Pgs. W/S Division - I SOUTH 24 PARGANAS Budge Budge-II Proposed Ground water based DAKHIN RAYPUR piped water supply scheme to accommodate FHTC in BUDGE BUDGE -II block under South 24 Parganas W/S Division-I, South 24 Parganas District for AUGMENTATION of surface water based Water Supply scheme in the Arsenic ,SM/13920 Augmentation South 24 Pgs Mechanical Division AE SWSD-I,Assistant Engineer -II Junior Engineer 29/11/2022 12/09/2022 30/11/2025 25/03/2024 0 768 292.37 0.00 89 0
54 South 24 Pgs. W/S Division - I SOUTH 24 PARGANAS Sonarpur SANGUR piped water supply scheme to accommodate FHTC in SONARPUR block under South 24 Parganas W/S Division-I for AUGMENTATION of surface water based W/S scheme in the Arsenic Affected Areas of South 24 Parganas District Under JJM,SM/14545 Augmentation South 24Pgs.Mechanical Sub-Division AE HQ-I,Assistant Engineer Junior Engineer 30/01/2023 20/02/2023 31/03/2025 25/03/2024 0 2,506 1,250.69 0.00 90 0
55 South 24 Pgs. W/S Division - I SOUTH 24 PARGANAS Magrahat-II Proposed Ground water based UTTAR GOPINATHPUR piped water supply scheme to accommodate FHTC in MAGRAHAT-II block under South 24 Parganas W/S Division-I, South 24 Parganas District for AUGMENTATION of surface water based Water Supply scheme in the Arsenic ,SM/14551 Augmentation South 24 Pgs Mechanical Division AE RWS, Alipore Division,Assistant Engineer JE, RWS, DH-II,Junior Engineer 30/01/2023 15/03/2023 30/11/2025 25/03/2024 0 3,706 1,117.57 0.00 85 0
56 South 24 Pgs. W/S Division - I SOUTH 24 PARGANAS Magrahat-II Proposed Ground water based MALLARCHAK ISHWARIPUR piped water supply scheme to accommodate FHTC in MAGRAHAT-II block under South 24 Parganas W/S Division-I, South 24 Parganas District for AUGMENTATION of surface water based Water Supply scheme in the Arse,SM/14661 Augmentation South 24 Pgs Mechanical Division Assistant Engineer Junior Engineer 31/01/2023 03/01/2023 31/03/2025 25/03/2024 0 1,962 691.87 0.00 90 0
57 South 24 Pgs. W/S Division - I SOUTH 24 PARGANAS Magrahat-II Proposed Ground water based MULTI piped water supply scheme to accommodate FHTC in MAGRAHAT-II block under South 24 Parganas W/S Division-I, South 24 Parganas District for AUGMENTATION of surface water based Water Supply scheme in the Arsenic Affected Are,SM/14663 Augmentation South 24 Pgs Mechanical Division Assistant Engineer Junior Engineer 31/01/2023 15/03/2023 31/03/2025 25/03/2024 0 3,314 999.99 0.00 85 0
58 South 24 Pgs. W/S Division - I SOUTH 24 PARGANAS Magrahat-II Ground water based UREL CHANDPUR piped water supply scheme to accommodate FHTC in MAGRAHAT-II block under South 24 Parganas W/S Division-I, South 24 Parganas District for AUGMENTATION of surface water based Water Supply scheme in the Arsenic Affected Area,SM/14863 Augmentation South 24 Pgs Mechanical Division AE RWS, Alipore Division,Assistant Engineer Junior Engineer 03/02/2023 20/02/2023 31/03/2025 25/03/2024 0 2,247 788.04 0.00 85 0
59 South 24 Pgs. W/S Division - I SOUTH 24 PARGANAS Baruipur Ground water based RAMNAGAR (ZONE-II) piped water supply scheme to accommodate FHTC in BARUIPUR block under South 24 Parganas W/S Division-I, PHE Dte for AUGMENTATION of surface water based W/S scheme in the Arsenic Affected Areas of South 24 Parganas dis,SM/15634 Augmentation Baruipur Sub-Division AE BSD,Assistant Engineer Junior Engineer 15/02/2023 04/11/2023 30/06/2025 25/03/2024 0 1,885 716.58 0.00 85 0
60 South 24 Pgs. W/S Division - I SOUTH 24 PARGANAS Sonarpur HASANPUR piped water supply scheme to accommodate FHTC in SONARPUR block under South 24 Parganas W/S Division-I for AUGMENTATION of surface water based W/S scheme in the Arsenic Affected Areas of South 24 Parganas District Under JJM,SM/15759 Augmentation South 24 Pgs. W/S Division - I AE HQ-I,Assistant Engineer Junior Engineer 20/02/2023 03/10/2023 31/03/2025 25/03/2024 0 1,435 858.13 0.00 90 0
61 South 24 Pgs. W/S Division - I SOUTH 24 PARGANAS Baruipur Proposed Ground water based PASCHIM MADHABPUR piped water supply scheme to accommodate FHTC in BARUIPUR block under South 24 Parganas W/S Division-I, South 24 Parganas District for AUGMENTATION of surface water based Water Supply scheme in the Arsenic Aff,SM/16128 Augmentation Baruipur Sub-Division AE BSD,Assistant Engineer Junior Engineer 22/02/2023 26/04/2023 31/03/2025 25/03/2024 0 332 145.09 0.00 83 0
62 South 24 Pgs. W/S Division - I SOUTH 24 PARGANAS Baruipur Proposed Ground water based SURJAPUR piped water supply scheme to accommodate FHTC in BARUIPUR block under South 24 Parganas W/S Division-I, South 24 Parganas District for AUGMENTATION of surface water based Water Supply scheme in the Arsenic Affected Are,SM/16135 Augmentation South 24Pgs.Mechanical Sub-Division AE BSD,Assistant Engineer Junior Engineer 22/02/2023 03/09/2023 31/05/2025 25/03/2024 0 348 199.17 0.00 86 0
63 South 24 Pgs. W/S Division - I SOUTH 24 PARGANAS Kultali Augmentation of laying distribution system to extend the benefit of 100% Households in ZONE-IV at KULTALI block within Mega surface water based water supply scheme for Falta-Mathurapur dist.- South 24 pgns. Under south 24 pgns W/S division-I of South 24-p,SM/16189 Augmentation Baruipur Sub-Division AE BSD 20/02/2023 28/02/2023 31/08/2025 25/03/2024 0 0 1,691.01 0.00 95 0
64 South 24 Pgs. W/S Division - I SOUTH 24 PARGANAS Budge Budge-I Augmentation for providing balance FHTC in Buita Chingripota Nischintipur Rajibpur & Uttar Roypur GP under SWD - I, P.H.E. Dte District South 24 Parganas. ,SM/16962 Augmentation Sub-Division - I under South 24 W/s Division - I AE SWSD-I 16/03/2023 07/11/2023 07/11/2025 25/03/2024 0 0 99.80 0.00 89 0
65 South 24 Pgs. W/S Division - I SOUTH 24 PARGANAS Kultali Augmentation of laying distribution system to extend the benefit of 100% Households in ZONE-II at KULTALI block within Mega surface water based water supply scheme of Falta-Mathurapur dist.- South 24 pgns. Under south 24 pgns water supply division-I, PHE ,SM/18223 Augmentation Baruipur Sub-Division AE BSD 27/04/2023 03/01/2023 31/08/2025 25/03/2024 0 0 2,958.02 0.00 92 0
Total 69,158 29,422.75 0   0