Sl. No. Division District Block Scheme Name Scheme Category Sub Division Name of AE entrusted Name of JE entrusted Date of Sanction Date of Commencement Target Date of Completion Date Of Updation Work Order Issued FHTCs Sanctioned Cost Payment Physical Progress (in %) Financial Progress (in %)
3 7 0 499.65 30.26   6
1 Malda Mechanical Division DAKSHIN DINAJPUR Balurghat Solarisation of WBSEDCL energised pump house with Supply and Installation of Grid-connected Ground Mounted Solar PV systems with Net Metering for twenty four nos. PWSS in the district of Dakshin Dinajpur under Malda Mechanical Division, PHE Dte.,SM/17180 Malda Mechanical Division Assistant Engineer - I Junior Engineer-01 15/03/2023 08/02/2023 08/02/2025 19/05/2025 5 0 201.44 30.26 15 15
2 Malda Mechanical Division DAKSHIN DINAJPUR Tapan Design, Supply and Installation of different capacity Solar Power Plant at various water work station of Tapan Sub Surface Water Based Piped Water Supply Scheme with Net Metering Arrangement, Monitoring System in the district of Dakshin Dinajpur under Mal,SM/17675 IOT Malda Mechanical Division Assistant Engineer - I Junior Engineer-01 22/03/2023 05/12/2024 22/09/2023 12/06/2023 1 0 148.48 0.00 0 0
3 Malda Mechanical Division DAKSHIN DINAJPUR Gangarampur Design, Supply and Installation of different capacity Solar Power Plant at various water work station of Gangarampur Sub Surface Water Based Piped Water Supply Scheme with Net Metering Arrangement, Monitoring System in the district of Dakshin Dinajpur un,SM/17676 IOT Malda Mechanical Division Assistant Engineer - I Junior Engineer-01 22/03/2023 08/02/2023 08/02/2025 19/05/2025 1 0 149.73 0.00 0 0
Total 7 0 499.65 30.26   6