Sl. No. Division District Block Scheme Name Scheme Category Sub Division Name of AE entrusted Name of JE entrusted Date of Sanction Date of Commencement Target Date of Completion Date Of Updation Work Order Issued FHTCs Sanctioned Cost Payment Physical Progress (in %) Financial Progress (in %)
129 261 0 1,530.79 188.87   12
1 Midnapore Mechanical Division PASCHIM MEDINIPUR Restoration of water supply arrangement by providing auxilary power by hired DG sets including allied works at different PWSS, Hospitals, Municipality & MTU in C/W Cyclone Yash under District Purba Medinipur, Paschim Medinipur.,SM/09023 Disaster Haldia Electrical Sub-Division Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division.,Sri Bikash Das, AE/Midnapur Mechanical Sub-Division-I Sri Sukanta Mondal, JE/Haldia Electrical Sub-Division.,Sri Mahadev Dutta, JE/Midnapur Mechanical Sub-Division-I,Sri Lab Das, JE/Midnapur Mechanical Sub-Division-I,Sri Bikas Pramanik, JE/Midnapur Mechanical Sub-Division-I,Sri Dablu Dutta, JE/Midnapur Mechanical Sub-Division-I,Sri Ujjal Kumar Dey, JE/Haldia Electrical Sub-Division.,Sri Krishanu Mondal, JE/Haldia Electrical Sub-Division.,Sri Tanmoy Shee, JE/Haldia Electrical Sub-Division.,Sri Mrityunjoy Paria, JE/Haldia Electrical Sub-Division.,JE/Midnapur Mechanical Sub-Division-I,Sri Raju Pramanik, JE/Haldia Electrical Sub-Division. 30/10/2021 31/12/2023 05/05/2023 130 0 248.31 188.87 0 76
2 Midnapore Mechanical Division PURBA MEDINIPUR Ramnagar - II AUGMENTATION OF DISINFECTION ARRANGEMENT FOR EASING OF OPERATION OF CHLORINATION AT BHERI BHARANGA AND OTHER 20 PWSS IN PURBA MEDINIPUR DISTRICT UNDER JJM PROGRAM UNDER MIDNAPORE MECHANICAL DIVISION P.H.E. Dte.,SM/14486 Augmentation Haldia Electrical Sub-Division Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. Sri Sukanta Mondal, JE/Haldia Electrical Sub-Division.,Sri Ujjal Kumar Dey, JE/Haldia Electrical Sub-Division. 20/01/2023 20/02/2023 20/07/2023 12/06/2023 1 0 42.52 0.00 0 0
3 Midnapore Mechanical Division PURBA MEDINIPUR Khejuri - II Rejuvenation of Electro-Mechanical components of Khejuri PWSS in the District of Purba Medinipur under JJM programme.,SM/16650 Augmentation Haldia Electrical Sub-Division Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. Sri Mrityunjoy Paria, JE/Haldia Electrical Sub-Division. 14/03/2023 23/03/2023 14/09/2023 12/06/2023 1 0 12.39 0.00 0 0
4 Midnapore Mechanical Division PURBA MEDINIPUR Haldia Rejuvenation of Electro-Mechanical components of Dwariberia PWSS in the District of Purba Medinipur under JJM programme.,SM/16652 Augmentation Haldia Electrical Sub-Division Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. Sri Tanmoy Shee, JE/Haldia Electrical Sub-Division. 14/03/2023 23/03/2023 14/09/2023 12/06/2023 1 0 12.39 0.00 0 0
5 Midnapore Mechanical Division PURBA MEDINIPUR Khejuri - I Rejuvenation of Electro-Mechanical components of Mukutshila, Zone-II PWSS in the District of Purba Medinipur under JJM programme.,SM/16654 Augmentation Haldia Electrical Sub-Division Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. Sri Mrityunjoy Paria, JE/Haldia Electrical Sub-Division. 14/03/2023 23/03/2023 14/09/2023 12/06/2023 1 0 12.39 0.00 0 0
6 Midnapore Mechanical Division PURBA MEDINIPUR Nandigram - I Rejuvenation of Electro-Mechanical components of Sonachura PWSS in the District of Purba Medinipur under JJM programme.,SM/16657 Augmentation Haldia Electrical Sub-Division Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. Sri Tanmoy Shee, JE/Haldia Electrical Sub-Division. 14/03/2023 23/03/2023 14/09/2023 12/06/2023 1 0 12.39 0.00 0 0
7 Midnapore Mechanical Division PURBA MEDINIPUR Mahisadal Rejuvenation of Electro-Mechanical components of Kapasharia PWSS in the District of Purba Medinipur under JJM programme.,SM/16660 Augmentation Haldia Electrical Sub-Division Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. Sri Krishanu Mondal, JE/Haldia Electrical Sub-Division. 14/03/2023 30/03/2023 14/09/2023 12/06/2023 1 0 12.39 0.00 0 0
8 Midnapore Mechanical Division PURBA MEDINIPUR Ramnagar - II Rejuvenation of Electro-Mechanical components of Narandia PWSS in the District of Purba Medinipur under JJM programme.,SM/16663 Augmentation Haldia Electrical Sub-Division Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. Sri Ujjal Kumar Dey, JE/Haldia Electrical Sub-Division. 14/03/2023 23/03/2023 14/09/2023 12/06/2023 1 0 12.39 0.00 0 0
9 Midnapore Mechanical Division PURBA MEDINIPUR Contai - III Rejuvenation of Electro-Mechanical components of Contai Saline Area, Zone-IV PWSS in the District of Purba Medinipur under JJM programme.,SM/16667 Augmentation Haldia Electrical Sub-Division Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. Sri Sukanta Mondal, JE/Haldia Electrical Sub-Division.,Sri Mrityunjoy Paria, JE/Haldia Electrical Sub-Division. 14/03/2023 23/03/2023 14/09/2023 12/06/2023 1 0 12.39 0.00 0 0
10 Midnapore Mechanical Division PURBA MEDINIPUR Ramnagar - II Rejuvenation of Electro-Mechanical components of Kanpur PWSS in the District of Purba Medinipur under JJM programme.,SM/16668 Augmentation Haldia Electrical Sub-Division Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. Sri Ujjal Kumar Dey, JE/Haldia Electrical Sub-Division. 14/03/2023 23/03/2023 14/09/2023 12/06/2023 1 0 12.39 0.00 0 0
11 Midnapore Mechanical Division PURBA MEDINIPUR Nanda Kumar Rejuvenation of Electro-Mechanical components of Thenkuachak, Zone-II PWSS in the District of Purba Medinipur under JJM programme.,SM/16669 Augmentation Haldia Electrical Sub-Division Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. Sri Tanmoy Shee, JE/Haldia Electrical Sub-Division. 14/03/2023 28/04/2023 14/09/2023 12/06/2023 1 0 12.39 0.00 0 0
12 Midnapore Mechanical Division PURBA MEDINIPUR Haldia Solarization of grid connected pumping installation at Barsundra PWSS in Purba Medinipore District under JJM programme under Midnapore Mechanical Division, PHE Dte.,SM/17296 Haldia Electrical Sub-Division Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. Sri Tanmoy Shee, JE/Haldia Electrical Sub-Division. 15/03/2023 23/03/2023 15/09/2023 12/06/2023 2 0 8.30 0.00 0 0
13 Midnapore Mechanical Division PURBA MEDINIPUR Haldia Solarization of grid connected pumping installation at Barbasudebpur PWSS in Purba Medinipore District under JJM programme under Midnapore Mechanical Division, PHE Dte.,SM/17305 Haldia Electrical Sub-Division Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. Sri Tanmoy Shee, JE/Haldia Electrical Sub-Division. 15/03/2023 23/03/2023 15/09/2023 12/06/2023 1 0 8.30 0.00 0 0
14 Midnapore Mechanical Division PURBA MEDINIPUR Haldia Solarization of grid connected pumping installation at Dakshin chak PWSS in Purba Medinipore District under JJM programme under Midnapore Mechanical Division, PHE Dte.,SM/17308 Haldia Electrical Sub-Division Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. Sri Tanmoy Shee, JE/Haldia Electrical Sub-Division. 15/03/2023 23/03/2023 15/09/2023 12/06/2023 1 0 8.30 0.00 0 0
15 Midnapore Mechanical Division PURBA MEDINIPUR Bhagawanpur - I Solarization of grid connected pumping installation at Badhia PWSS in Purba Medinipore District under JJM programme under Midnapore Mechanical Division, PHE Dte,SM/17309 Haldia Electrical Sub-Division Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. Sri Sukanta Mondal, JE/Haldia Electrical Sub-Division.,Sri Ujjal Kumar Dey, JE/Haldia Electrical Sub-Division. 15/03/2023 23/03/2023 15/09/2023 12/06/2023 1 0 8.30 0.00 0 0
16 Midnapore Mechanical Division PASCHIM MEDINIPUR Pingla Solarization of grid connected pumping installation at Gobardhanpur PWSS in Paschim Medinipore District under JJM programme under Midnapore Mechanical Division, PHE Dte,SM/17310 Midnapur Mechanical Sub Division-I Sri Bikash Das, AE/Midnapur Mechanical Sub-Division-I Sri Dablu Dutta, JE/Midnapur Mechanical Sub-Division-I 15/03/2023 24/03/2023 15/09/2023 12/06/2023 1 0 8.30 0.00 85 0
17 Midnapore Mechanical Division PASCHIM MEDINIPUR Sabang Solarization of grid connected pumping installation at Sarta PWSS in Paschim Medinipore District under JJM programme under Midnapore Mechanical Division, PHE Dte,SM/17312 Midnapur Mechanical Sub Division-I Sri Bikash Das, AE/Midnapur Mechanical Sub-Division-I Sri Mahadev Dutta, JE/Midnapur Mechanical Sub-Division-I 15/03/2023 23/03/2023 15/09/2023 12/06/2023 1 0 8.30 0.00 0 0
18 Midnapore Mechanical Division PURBA MEDINIPUR Nanda Kumar Solarization of grid connected pumping installation at Dakshin Dalhara PWSS in Purba Medinipore District under JJM programme under Midnapore Mechanical Division, PHE Dte.,SM/17314 Haldia Electrical Sub-Division Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. Sri Krishanu Mondal, JE/Haldia Electrical Sub-Division.,Sri Raju Pramanik, JE/Haldia Electrical Sub-Division. 15/03/2023 23/03/2023 15/09/2023 12/06/2023 1 0 8.30 0.00 0 0
19 Midnapore Mechanical Division PASCHIM MEDINIPUR Midnapore Solarization of grid connected pumping installation at Bajpara PWSS in Paschim Medinipore District under JJM programme under Midnapore Mechanical Division, PHE Dte,SM/17316 Midnapur Mechanical Sub Division-I Sri Bikash Das, AE/Midnapur Mechanical Sub-Division-I Sri Bikas Pramanik, JE/Midnapur Mechanical Sub-Division-I 15/03/2023 23/03/2023 15/09/2023 12/06/2023 1 0 8.30 0.00 75 0
20 Midnapore Mechanical Division PURBA MEDINIPUR Sutahata Solarization of grid connected pumping installation at Dhenkua PWSS in Purba Medinipore District under JJM programme under Midnapore Mechanical Division, PHE Dte.,SM/17317 Haldia Electrical Sub-Division Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. Sri Tanmoy Shee, JE/Haldia Electrical Sub-Division. 15/03/2023 23/03/2023 15/09/2023 12/06/2023 1 0 8.30 0.00 0 0
21 Midnapore Mechanical Division PURBA MEDINIPUR Nanda Kumar Solarization of grid connected pumping installation at Baichberia PWSS in Purba Medinipore District under JJM programme under Midnapore Mechanical Division, PHE Dte.,SM/17318 Haldia Electrical Sub-Division Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. Sri Tanmoy Shee, JE/Haldia Electrical Sub-Division. 15/03/2023 23/03/2023 15/09/2023 12/06/2023 1 0 8.30 0.00 0 0
22 Midnapore Mechanical Division PASCHIM MEDINIPUR Sabang Solarization of grid connected pumping installation at Julkapore PWSS in Paschim Medinipore District under JJM programme under Midnapore Mechanical Division, PHE Dte,SM/17319 Midnapur Mechanical Sub Division-I Sri Bikash Das, AE/Midnapur Mechanical Sub-Division-I Sri Mahadev Dutta, JE/Midnapur Mechanical Sub-Division-I 15/03/2023 24/03/2023 15/09/2023 12/06/2023 1 0 8.30 0.00 0 0
23 Midnapore Mechanical Division PASCHIM MEDINIPUR Keshpur Solarization of grid connected pumping installation at Dhamsai PWSS in Paschim Medinipore District under JJM programme under Midnapore Mechanical Division, PHE Dte,SM/17320 Midnapur Mechanical Sub Division-I Sri Bikash Das, AE/Midnapur Mechanical Sub-Division-I Sri Dablu Dutta, JE/Midnapur Mechanical Sub-Division-I 15/03/2023 23/03/2023 15/09/2023 12/06/2023 1 0 8.30 0.00 0 0
24 Midnapore Mechanical Division PURBA MEDINIPUR Tamluk Solarization of grid connected pumping installation at Bishnubarh PWSS in Purba Medinipore District under JJM programme under Midnapore Mechanical Division, PHE Dte.,SM/17322 Haldia Electrical Sub-Division Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. Sri Raju Pramanik, JE/Haldia Electrical Sub-Division. 15/03/2023 23/03/2023 15/09/2023 12/06/2023 1 0 8.30 0.00 0 0
25 Midnapore Mechanical Division PURBA MEDINIPUR Egra - II Solarization of grid connected pumping installation at Chirulia PWSS in Purba Medinipore District under JJM programme under Midnapore Mechanical Division, PHE Dte.,SM/17323 Haldia Electrical Sub-Division Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. Sri Sukanta Mondal, JE/Haldia Electrical Sub-Division. 15/03/2023 23/03/2023 15/09/2023 12/06/2023 1 0 8.30 0.00 0 0
26 Midnapore Mechanical Division PURBA MEDINIPUR Deshopran Solarization of grid connected pumping installation at Bamunia PWSS in Purba Medinipore District under JJM programme under Midnapore Mechanical Division, PHE Dte.,SM/17324 Haldia Electrical Sub-Division Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. Sri Mrityunjoy Paria, JE/Haldia Electrical Sub-Division. 15/03/2023 23/03/2023 15/09/2023 12/06/2023 1 0 8.30 0.00 0 0
27 Midnapore Mechanical Division PASCHIM MEDINIPUR Kharagpur - I Solarization of grid connected pumping installation at Satkui PWSS in Paschim Medinipore District under JJM programme under Midnapore Mechanical Division, PHE Dte,SM/17327 Midnapur Mechanical Sub Division-I Sri Bikash Das, AE/Midnapur Mechanical Sub-Division-I JE/Midnapur Mechanical Sub-Division-I 15/03/2023 23/03/2023 15/09/2023 12/06/2023 1 0 8.30 0.00 5 0
28 Midnapore Mechanical Division PURBA MEDINIPUR Egra - II Solarization of grid connected pumping installation at Asthichak PWSS in Purba Medinipore District under JJM programme under Midnapore Mechanical Division, PHE Dte.,SM/17329 Haldia Electrical Sub-Division Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. Sri Sukanta Mondal, JE/Haldia Electrical Sub-Division. 15/03/2023 23/03/2023 15/09/2023 12/06/2023 1 0 8.30 0.00 0 0
29 Midnapore Mechanical Division PASCHIM MEDINIPUR Garbeta - III Solarization of grid connected pumping installation at Chandrakona Road, Zone-I& Zone-II PWSS in Paschim Medinipore District under JJM programme under Midnapore Mechanical Division, PHE Dte,SM/17330 Midnapur Mechanical Sub Division-I Sri Bikash Das, AE/Midnapur Mechanical Sub-Division-I Sri Dablu Dutta, JE/Midnapur Mechanical Sub-Division-I 15/03/2023 23/03/2023 15/09/2023 12/06/2023 1 0 16.61 0.00 55 0
30 Midnapore Mechanical Division PURBA MEDINIPUR Contai - I Solarization of grid connected pumping installation at Barchunfali PWSS in Purba Medinipore District under JJM programme under Midnapore Mechanical Division, PHE Dte.,SM/17331 Haldia Electrical Sub-Division Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. Sri Sukanta Mondal, JE/Haldia Electrical Sub-Division.,Sri Tanmoy Shee, JE/Haldia Electrical Sub-Division.,Sri Mrityunjoy Paria, JE/Haldia Electrical Sub-Division. 15/03/2023 23/03/2023 15/09/2023 12/06/2023 1 0 8.30 0.00 0 0
31 Midnapore Mechanical Division PASCHIM MEDINIPUR Pingla Solarization of grid connected pumping installation at Maligram PWSS in Paschim Medinipore District under JJM programme under Midnapore Mechanical Division, PHE Dte,SM/17333 Midnapur Mechanical Sub Division-I Sri Bikash Das, AE/Midnapur Mechanical Sub-Division-I Sri Dablu Dutta, JE/Midnapur Mechanical Sub-Division-I 15/03/2023 23/03/2023 15/09/2023 12/06/2023 1 0 8.30 0.00 5 0
32 Midnapore Mechanical Division PURBA MEDINIPUR Deshopran Solarization of grid connected pumping installation at Anurai PWSS in Purba Medinipore District under JJM programme under Midnapore Mechanical Division, PHE Dte.,SM/17337 Haldia Electrical Sub-Division Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. Sri Sukanta Mondal, JE/Haldia Electrical Sub-Division.,Sri Mrityunjoy Paria, JE/Haldia Electrical Sub-Division. 15/03/2023 23/03/2023 15/09/2023 12/06/2023 1 0 8.30 0.00 0 0
33 Midnapore Mechanical Division PASCHIM MEDINIPUR Sabang Solarization of grid connected pumping installation at Nona Madhabchak PWSS in Paschim Medinipore District under JJM programme under Midnapore Mechanical Division, PHE Dte,SM/17338 Midnapur Mechanical Sub Division-I Sri Bikash Das, AE/Midnapur Mechanical Sub-Division-I Sri Mahadev Dutta, JE/Midnapur Mechanical Sub-Division-I 15/03/2023 23/03/2023 15/09/2023 12/06/2023 1 0 8.30 0.00 90 0
34 Midnapore Mechanical Division PURBA MEDINIPUR Contai - I Solarization of grid connected pumping installation at Damudarpur PWSS in Purba Medinipore District under JJM programme under Midnapore Mechanical Division, PHE Dte.,SM/17341 Haldia Electrical Sub-Division Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. Sri Mrityunjoy Paria, JE/Haldia Electrical Sub-Division. 15/03/2023 23/03/2023 15/09/2023 12/06/2023 1 0 8.30 0.00 0 0
35 Midnapore Mechanical Division PASCHIM MEDINIPUR Keshiary Solarization of grid connected pumping installation at Keshiary PWSS in Paschim Medinipore District under JJM programme under Midnapore Mechanical Division, PHE Dte,SM/17342 Midnapur Mechanical Sub Division-I Sri Bikash Das, AE/Midnapur Mechanical Sub-Division-I Sri Dablu Dutta, JE/Midnapur Mechanical Sub-Division-I 15/03/2023 23/03/2023 15/09/2023 12/06/2023 1 0 8.30 0.00 50 0
36 Midnapore Mechanical Division PASCHIM MEDINIPUR Midnapore Solarization of grid connected pumping installation at Nayagram PWSS in Paschim Medinipore District under JJM programme under Midnapore Mechanical Division, PHE Dte,SM/17344 Midnapur Mechanical Sub Division-I Sri Bikash Das, AE/Midnapur Mechanical Sub-Division-I Sri Mahadev Dutta, JE/Midnapur Mechanical Sub-Division-I 15/03/2023 23/03/2023 15/09/2023 12/06/2023 1 0 8.30 0.00 0 0
37 Midnapore Mechanical Division PURBA MEDINIPUR Egra - II Solarization of grid connected pumping installation at Basudebpur PWSS in Purba Medinipore District under JJM programme under Midnapore Mechanical Division, PHE Dte.,SM/17347 Haldia Electrical Sub-Division Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. Sri Sukanta Mondal, JE/Haldia Electrical Sub-Division. 15/03/2023 23/03/2023 15/09/2023 12/06/2023 1 0 8.30 0.00 0 0
38 Midnapore Mechanical Division PURBA MEDINIPUR Tamluk Solarization of grid connected pumping installation at Anantapur PWSS in Purba Medinipore District under JJM programme under Midnapore Mechanical Division, PHE Dte.,SM/17349 Haldia Electrical Sub-Division Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. Sri Raju Pramanik, JE/Haldia Electrical Sub-Division. 15/03/2023 23/03/2023 15/09/2023 12/06/2023 1 0 16.61 0.00 0 0
39 Midnapore Mechanical Division PURBA MEDINIPUR Potashpur - II Solarization of grid connected pumping installation at Bagmari (Potashpur - II) PWSS in Purba Medinipore District under JJM programme under Midnapore Mechanical Division, PHE Dte.,SM/17350 Haldia Electrical Sub-Division Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. Sri Sukanta Mondal, JE/Haldia Electrical Sub-Division. 15/03/2023 23/03/2023 15/09/2023 12/06/2023 1 0 8.30 0.00 0 0
40 Midnapore Mechanical Division PURBA MEDINIPUR Egra - I Solarization of grid connected pumping installation at Bagmari (Egra-I) PWSS in Purba Medinipore District under JJM programme under Midnapore Mechanical Division, PHE Dte.,SM/17351 Haldia Electrical Sub-Division Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. Sri Mrityunjoy Paria, JE/Haldia Electrical Sub-Division. 15/03/2023 23/03/2023 15/09/2023 12/06/2023 1 0 8.30 0.00 0 0
41 Midnapore Mechanical Division PURBA MEDINIPUR Egra - I Solarization of grid connected pumping installation at Chirulia Chalta PWSS in Purba Medinipore District under JJM programme under Midnapore Mechanical Division, PHE Dte.,SM/17352 Haldia Electrical Sub-Division Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. Sri Mrityunjoy Paria, JE/Haldia Electrical Sub-Division. 15/03/2023 23/03/2023 15/09/2023 12/06/2023 1 0 33.22 0.00 0 0
42 Midnapore Mechanical Division PURBA MEDINIPUR Deshopran Solarization of grid connected pumping installation at Bankiput PWSS in Purba Medinipore District under JJM programme under Midnapore Mechanical Division, PHE Dte.,SM/17353 Haldia Electrical Sub-Division Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. Sri Mrityunjoy Paria, JE/Haldia Electrical Sub-Division. 15/03/2023 23/03/2023 15/09/2023 12/06/2023 1 0 8.30 0.00 0 0
43 Midnapore Mechanical Division PURBA MEDINIPUR Moyna Solarization of grid connected pumping installation at Chandibeniya, Zone-I & Zone-II PWSS in Purba Medinipore District under JJM programme under Midnapore Mechanical Division, PHE Dte.,SM/17355 Haldia Electrical Sub-Division Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. Sri Krishanu Mondal, JE/Haldia Electrical Sub-Division. 15/03/2023 23/03/2023 15/09/2023 12/06/2023 1 0 16.61 0.00 0 0
44 Midnapore Mechanical Division PASCHIM MEDINIPUR Narayangarh Solarization of grid connected pumping installation at Belda PWSS in Paschim Medinipore District under JJM programme under Midnapore Mechanical Division, PHE Dte,SM/17357 Midnapur Mechanical Sub Division-I Sri Bikash Das, AE/Midnapur Mechanical Sub-Division-I Sri Lab Das, JE/Midnapur Mechanical Sub-Division-I 15/03/2023 23/03/2023 15/09/2023 12/06/2023 1 0 8.30 0.00 10 0
45 Midnapore Mechanical Division PURBA MEDINIPUR Sutahata Solarization of grid connected pumping installation at Chaitanyapur PWSS in Purba Medinipore District under JJM programme under Midnapore Mechanical Division, PHE Dte.,SM/17361 Haldia Electrical Sub-Division Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. Sri Tanmoy Shee, JE/Haldia Electrical Sub-Division. 15/03/2023 23/03/2023 15/09/2023 12/06/2023 1 0 8.30 0.00 0 0
46 Midnapore Mechanical Division PASCHIM MEDINIPUR Pingla Solarization of grid connected pumping installation at Nona Pingla PWSS in Paschim Medinipore District under JJM programme under Midnapore Mechanical Division, PHE Dte,SM/17363 Midnapur Mechanical Sub Division-I Sri Bikash Das, AE/Midnapur Mechanical Sub-Division-I Sri Mahadev Dutta, JE/Midnapur Mechanical Sub-Division-I,Sri Dablu Dutta, JE/Midnapur Mechanical Sub-Division-I 15/03/2023 23/03/2023 15/09/2023 12/06/2023 1 0 8.30 0.00 0 0
47 Midnapore Mechanical Division PURBA MEDINIPUR Bhagawanpur - I Solarization of grid connected pumping installation at Bhagabanpur, Zone-I & Zone-II PWSS in Purba Medinipore District under JJM programme under Midnapore Mechanical Division, PHE Dte.,SM/17364 Haldia Electrical Sub-Division Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. Sri Ujjal Kumar Dey, JE/Haldia Electrical Sub-Division. 15/03/2023 23/03/2023 15/09/2023 12/06/2023 1 0 16.61 0.00 0 0
48 Midnapore Mechanical Division PASCHIM MEDINIPUR Salbani Solarization of grid connected pumping installation at Salbani PWSS in Paschim Medinipore District under JJM programme under Midnapore Mechanical Division, PHE Dte,SM/17365 Midnapur Mechanical Sub Division-I Sri Bikash Das, AE/Midnapur Mechanical Sub-Division-I Sri Dablu Dutta, JE/Midnapur Mechanical Sub-Division-I 15/03/2023 23/03/2023 15/09/2023 12/06/2023 1 0 8.30 0.00 0 0
49 Midnapore Mechanical Division PURBA MEDINIPUR Panskura Solarization of grid connected pumping installation at Dakhsin Mechogram PWSS in Purba Medinipore District under JJM programme under Midnapore Mechanical Division, PHE Dte.,SM/17367 Haldia Electrical Sub-Division Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. Sri Raju Pramanik, JE/Haldia Electrical Sub-Division. 15/03/2023 23/03/2023 15/09/2023 12/06/2023 1 0 8.30 0.00 0 0
50 Midnapore Mechanical Division PASCHIM MEDINIPUR Pingla Solarization of grid connected pumping installation at Nona Ragpur PWSS in Paschim Medinipore District under JJM programme under Midnapore Mechanical Division, PHE Dte,SM/17368 Midnapur Mechanical Sub Division-I Sri Bikash Das, AE/Midnapur Mechanical Sub-Division-I Sri Dablu Dutta, JE/Midnapur Mechanical Sub-Division-I 15/03/2023 23/03/2023 15/09/2023 12/06/2023 1 0 8.30 0.00 0 0
51 Midnapore Mechanical Division PASCHIM MEDINIPUR Kharagpur - I Solarization of grid connected pumping installation at Paschim Pathari PWSS in Paschim Medinipore District under JJM programme under Midnapore Mechanical Division, PHE Dte,SM/17369 Midnapur Mechanical Sub Division-I Sri Bikash Das, AE/Midnapur Mechanical Sub-Division-I JE/Midnapur Mechanical Sub-Division-I 15/03/2023 23/03/2023 15/09/2023 12/06/2023 1 0 8.30 0.00 0 0
52 Midnapore Mechanical Division PASCHIM MEDINIPUR Daspur - II Solarization of grid connected pumping installation at Sonakhali PWSS in Paschim Medinipore District under JJM programme under Midnapore Mechanical Division, PHE Dte,SM/17370 Midnapur Mechanical Sub Division-I Sri Bikash Das, AE/Midnapur Mechanical Sub-Division-I Sri Lab Das, JE/Midnapur Mechanical Sub-Division-I 15/03/2023 23/03/2023 15/09/2023 12/06/2023 1 0 8.30 0.00 65 0
53 Midnapore Mechanical Division PASCHIM MEDINIPUR Garbeta - II Solarization of grid connected pumping installation at Ukhla PWSS in Paschim Medinipore District under JJM programme under Midnapore Mechanical Division, PHE Dte,SM/17371 Midnapur Mechanical Sub Division-I Sri Bikash Das, AE/Midnapur Mechanical Sub-Division-I Sri Dablu Dutta, JE/Midnapur Mechanical Sub-Division-I 15/03/2023 23/03/2023 15/09/2023 12/06/2023 1 0 8.30 0.00 80 0
54 Midnapore Mechanical Division PURBA MEDINIPUR Nanda Kumar Solarization of grid connected pumping installation at Bargodagoda PWSS in Purba Medinipore District under JJM programme under Midnapore Mechanical Division, PHE Dte.,SM/17372 Haldia Electrical Sub-Division Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. Sri Tanmoy Shee, JE/Haldia Electrical Sub-Division. 15/03/2023 23/03/2023 15/09/2023 12/06/2023 1 0 8.30 0.00 0 0
55 Midnapore Mechanical Division PASCHIM MEDINIPUR Daspur - I Solarization of grid connected pumping installation at Daspur PWSS in Paschim Medinipore District under JJM programme under Midnapore Mechanical Division, PHE Dte,SM/17373 Midnapur Mechanical Sub Division-I Sri Bikash Das, AE/Midnapur Mechanical Sub-Division-I Sri Mahadev Dutta, JE/Midnapur Mechanical Sub-Division-I 15/03/2023 23/03/2023 15/09/2023 12/06/2023 1 0 8.30 0.00 0 0
56 Midnapore Mechanical Division PASCHIM MEDINIPUR Midnapore Solarization of grid connected pumping installation at Bhabaninagar PWSS in Paschim Medinipore District under JJM programme under Midnapore Mechanical Division, PHE Dte,SM/17374 Midnapur Mechanical Sub Division-I Sri Bikash Das, AE/Midnapur Mechanical Sub-Division-I Sri Mahadev Dutta, JE/Midnapur Mechanical Sub-Division-I 15/03/2023 23/03/2023 15/09/2023 12/06/2023 1 0 8.30 0.00 90 0
57 Midnapore Mechanical Division PASCHIM MEDINIPUR Sabang Solarization of grid connected pumping installation at Lutunia PWSS in Paschim Medinipore District under JJM programme under Midnapore Mechanical Division, PHE Dte,SM/17375 Midnapur Mechanical Sub Division-I Sri Bikash Das, AE/Midnapur Mechanical Sub-Division-I Sri Mahadev Dutta, JE/Midnapur Mechanical Sub-Division-I 15/03/2023 23/03/2023 15/09/2023 12/06/2023 1 0 8.30 0.00 70 0
58 Midnapore Mechanical Division PASCHIM MEDINIPUR Salbani Solarization of grid connected pumping installation at Jatra Bansiriasole PWSS in Paschim Medinipore District under JJM programme under Midnapore Mechanical Division, PHE Dte,SM/17377 Midnapur Mechanical Sub Division-I Sri Bikash Das, AE/Midnapur Mechanical Sub-Division-I Sri Dablu Dutta, JE/Midnapur Mechanical Sub-Division-I 15/03/2023 24/03/2023 15/09/2023 12/06/2023 1 0 8.30 0.00 0 0
59 Midnapore Mechanical Division PURBA MEDINIPUR Tamluk Solarization of grid connected pumping installation at Chapbasan PWSS in Purba Medinipore District under JJM programme under Midnapore Mechanical Division, PHE Dte.,SM/17378 Haldia Electrical Sub-Division Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. Sri Raju Pramanik, JE/Haldia Electrical Sub-Division. 15/03/2023 23/03/2023 15/09/2023 12/06/2023 1 0 8.30 0.00 0 0
60 Midnapore Mechanical Division PURBA MEDINIPUR Deshopran Solarization of grid connected pumping installation at Basudebberia PWSS in Purba Medinipore District under JJM programme under Midnapore Mechanical Division, PHE Dte.,SM/17379 Haldia Electrical Sub-Division Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. Sri Mrityunjoy Paria, JE/Haldia Electrical Sub-Division. 15/03/2023 23/03/2023 15/09/2023 12/06/2023 1 0 8.30 0.00 0 0
61 Midnapore Mechanical Division PASCHIM MEDINIPUR Midnapore Solarization of grid connected pumping installation at Abashgarh PWSS in Paschim Medinipore District under JJM programme under Midnapore Mechanical Division, PHE Dte,SM/17380 Midnapur Mechanical Sub Division-I Sri Bikash Das, AE/Midnapur Mechanical Sub-Division-I Sri Mahadev Dutta, JE/Midnapur Mechanical Sub-Division-I 15/03/2023 23/03/2023 15/09/2023 12/06/2023 1 0 8.30 0.00 0 0
62 Midnapore Mechanical Division PASCHIM MEDINIPUR Mohanpur Solarization of grid connected pumping installation at Mohanpur (Mohanpur) PWSS in Paschim Medinipore District under JJM programme under Midnapore Mechanical Division, PHE Dte,SM/17381 Midnapur Mechanical Sub Division-I Sri Bikash Das, AE/Midnapur Mechanical Sub-Division-I Sri Lab Das, JE/Midnapur Mechanical Sub-Division-I 15/03/2023 23/03/2023 15/09/2023 12/06/2023 1 0 8.30 0.00 0 0
63 Midnapore Mechanical Division PURBA MEDINIPUR Sahid Matangini Solarization of grid connected pumping installation at Alinan, Zone-I & Zone-II PWSS in Purba Medinipore District under JJM programme under Midnapore Mechanical Division, PHE Dte. ,SM/17385 Haldia Electrical Sub-Division Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. Sri Raju Pramanik, JE/Haldia Electrical Sub-Division. 15/03/2023 23/03/2023 15/09/2023 12/06/2023 1 0 16.61 0.00 0 0
64 Midnapore Mechanical Division PURBA MEDINIPUR Ramnagar - I Solarization of grid connected pumping installation at Chandanpur PWSS in Purba Medinipore District under JJM programme under Midnapore Mechanical Division, PHE Dte.,SM/17386 Haldia Electrical Sub-Division Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. Sri Ujjal Kumar Dey, JE/Haldia Electrical Sub-Division. 15/03/2023 23/03/2023 15/09/2023 12/06/2023 1 0 8.30 0.00 0 0
65 Midnapore Mechanical Division PURBA MEDINIPUR Sahid Matangini Solarization of grid connected pumping installation at Chatra (Sahid Matangini) PWSS in Purba Medinipore District under JJM programme under Midnapore Mechanical Division, PHE Dte.,SM/17387 Haldia Electrical Sub-Division Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. Sri Raju Pramanik, JE/Haldia Electrical Sub-Division. 15/03/2023 23/03/2023 15/09/2023 12/06/2023 1 0 8.30 0.00 0 0
66 Midnapore Mechanical Division PASCHIM MEDINIPUR Daspur - II Solarization of grid connected pumping installation at Jote Ghanashyam PWSS in Paschim Medinipore District under JJM programme under Midnapore Mechanical Division, PHE Dte,SM/17407 Midnapur Mechanical Sub Division-I Sri Bikash Das, AE/Midnapur Mechanical Sub-Division-I Sri Lab Das, JE/Midnapur Mechanical Sub-Division-I 15/03/2023 24/03/2023 15/09/2023 12/06/2023 1 0 8.30 0.00 95 0
67 Midnapore Mechanical Division PASCHIM MEDINIPUR Sabang Solarization of grid connected pumping installation at Khagragerya PWSS in Paschim Medinipore District under JJM programme under Midnapore Mechanical Division, PHE Dte.,SM/17414 Midnapur Mechanical Sub Division-I Sri Bikash Das, AE/Midnapur Mechanical Sub-Division-I Sri Bikas Pramanik, JE/Midnapur Mechanical Sub-Division-I 20/03/2023 23/03/2023 20/09/2023 12/06/2023 1 0 8.30 0.00 45 0
68 Midnapore Mechanical Division PURBA MEDINIPUR Nandigram - I Solarization of grid connected pumping installation at Mahammadpur (Nandigram) PWSS in Purba Medinipore District under JJM programme under Midnapore Mechanical Division, PHE Dte.,SM/17717 Haldia Electrical Sub-Division Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. Sri Tanmoy Shee, JE/Haldia Electrical Sub-Division. 17/03/2023 29/03/2023 17/09/2023 12/06/2023 1 0 8.30 0.00 0 0
69 Midnapore Mechanical Division PURBA MEDINIPUR Panskura Solarization of grid connected pumping installation at Gogras keshab bar PWSS in Purba Medinipore District under JJM programme under Midnapore Mechanical Division, PHE Dte.,SM/17723 Haldia Electrical Sub-Division Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. Sri Raju Pramanik, JE/Haldia Electrical Sub-Division. 17/03/2023 29/03/2023 17/09/2023 12/06/2023 1 0 8.30 0.00 0 0
70 Midnapore Mechanical Division PURBA MEDINIPUR Chandipur Solarization of grid connected pumping installation at Erasal PWSS in Purba Medinipore District under JJM programme under Midnapore Mechanical Division, PHE Dte.,SM/17724 Haldia Electrical Sub-Division Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. Sri Krishanu Mondal, JE/Haldia Electrical Sub-Division. 17/03/2023 29/03/2023 17/09/2023 12/06/2023 1 0 8.30 0.00 0 0
71 Midnapore Mechanical Division PURBA MEDINIPUR Haldia Solarization of grid connected pumping installation at Solat PWSS in Purba Medinipore District under JJM programme under Midnapore Mechanical Division, PHE Dte.,SM/17726 Haldia Electrical Sub-Division Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. Sri Tanmoy Shee, JE/Haldia Electrical Sub-Division. 17/03/2023 29/03/2023 17/09/2023 12/06/2023 1 0 8.30 0.00 0 0
72 Midnapore Mechanical Division PASCHIM MEDINIPUR Dantan - II Rejuvenation of Electro-Mechanical components of Dhaneswarpur (Block Dantan-II) PWSS in the District of Paschim Medinipur under JJM programme.,SM/17728 Augmentation Midnapur Mechanical Sub Division-I Sri Bikash Das, AE/Midnapur Mechanical Sub-Division-I Sri Bikas Pramanik, JE/Midnapur Mechanical Sub-Division-I 17/03/2023 29/03/2023 17/09/2023 12/06/2023 1 0 12.39 0.00 0 0
73 Midnapore Mechanical Division PASCHIM MEDINIPUR Garbeta - II Solarization of grid connected pumping installation Chatra PWSS in Paschim Medinipore District under JJM programme under Midnapore Mechanical Division, PHE Dte.,SM/17735 Midnapur Mechanical Sub Division-I Sri Bikash Das, AE/Midnapur Mechanical Sub-Division-I Sri Dablu Dutta, JE/Midnapur Mechanical Sub-Division-I 17/03/2023 29/03/2023 17/09/2023 12/06/2023 1 0 8.30 0.00 80 0
74 Midnapore Mechanical Division PASCHIM MEDINIPUR Ghatal Solarization of grid connected pumping installation at Mohanpur (Ghatal) PWSS in Paschim Medinipore District under JJM programme under Midnapore Mechanical Division, PHE Dte,SM/17744 Midnapur Mechanical Sub Division-I Sri Bikash Das, AE/Midnapur Mechanical Sub-Division-I Sri Mahadev Dutta, JE/Midnapur Mechanical Sub-Division-I 17/03/2023 29/03/2023 17/09/2023 12/06/2023 1 0 8.30 0.00 0 0
75 Midnapore Mechanical Division PURBA MEDINIPUR Tamluk Solarization of grid connected pumping installation at Uttar Sonamui PWSS in Purba Medinipore District under JJM programme under Midnapore Mechanical Division, PHE Dte.,SM/17747 Haldia Electrical Sub-Division Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. Sri Raju Pramanik, JE/Haldia Electrical Sub-Division. 17/03/2023 29/03/2023 17/09/2023 12/06/2023 1 0 8.30 0.00 0 0
76 Midnapore Mechanical Division PASCHIM MEDINIPUR Pingla Solarization of grid connected pumping installation at Dhaneswarpur (Pingla) PWSS in Paschim Medinipore District under JJM programme under Midnapore Mechanical Division, PHE Dte,SM/17751 Midnapur Mechanical Sub Division-I Sri Bikash Das, AE/Midnapur Mechanical Sub-Division-I Sri Dablu Dutta, JE/Midnapur Mechanical Sub-Division-I 17/03/2023 29/03/2023 17/09/2023 12/06/2023 1 0 8.30 0.00 0 0
77 Midnapore Mechanical Division PASCHIM MEDINIPUR Kharagpur - II Solarization of grid connected pumping installation Gokulpur PWSS in Paschim Medinipore District under JJM programme under Midnapore Mechanical Division, PHE Dte.,SM/17752 Midnapur Mechanical Sub Division-I Sri Bikash Das, AE/Midnapur Mechanical Sub-Division-I JE/Midnapur Mechanical Sub-Division-I 17/03/2023 29/03/2023 17/09/2023 12/06/2023 1 0 8.30 0.00 0 0
78 Midnapore Mechanical Division PASCHIM MEDINIPUR Garbeta - II Rejuvenation of Electro-Mechanical components of Ukhla PWSS in the District of Paschim Medinipur under JJM programme.,SM/17755 Augmentation Midnapur Mechanical Sub Division-I Sri Bikash Das, AE/Midnapur Mechanical Sub-Division-I Sri Dablu Dutta, JE/Midnapur Mechanical Sub-Division-I 17/03/2023 29/03/2023 17/09/2023 12/06/2023 2 0 24.79 0.00 80 0
79 Midnapore Mechanical Division PURBA MEDINIPUR Sahid Matangini Solarization of grid connected pumping installation at KANKTYA PWSS in Purba Medinipore District under JJM programme under Midnapore Mechanical Division, PHE Dte.,SM/17756 Haldia Electrical Sub-Division Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. Sri Raju Pramanik, JE/Haldia Electrical Sub-Division. 17/03/2023 29/03/2023 17/09/2023 12/06/2023 1 0 8.30 0.00 0 0
80 Midnapore Mechanical Division PURBA MEDINIPUR Mahisadal Solarization of grid connected pumping installation at Natshallakhya, Zone-II PWSS in Purba Medinipore District under JJM programme under Midnapore Mechanical Division, PHE Dte.,SM/17757 Haldia Electrical Sub-Division Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. Sri Krishanu Mondal, JE/Haldia Electrical Sub-Division. 17/03/2023 29/03/2023 17/09/2023 12/06/2023 1 0 8.30 0.00 0 0
81 Midnapore Mechanical Division PASCHIM MEDINIPUR Sabang Solarization of grid connected pumping installation Adasimla PWSS in Paschim Medinipore District under JJM programme under Midnapore Mechanical Division, PHE Dte.,SM/17759 Midnapur Mechanical Sub Division-I Sri Bikash Das, AE/Midnapur Mechanical Sub-Division-I Sri Mahadev Dutta, JE/Midnapur Mechanical Sub-Division-I 17/03/2023 29/03/2023 17/09/2023 12/06/2023 1 0 8.30 0.00 75 0
82 Midnapore Mechanical Division PURBA MEDINIPUR Haldia Solarization of grid connected pumping installation at Dwariberia PWSS in Purba Medinipore District under JJM programme under Midnapore Mechanical Division, PHE Dte.,SM/17761 Haldia Electrical Sub-Division Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. Sri Tanmoy Shee, JE/Haldia Electrical Sub-Division. 17/03/2023 29/03/2023 17/09/2023 12/06/2023 1 0 8.30 0.00 0 0
83 Midnapore Mechanical Division PURBA MEDINIPUR Sahid Matangini Solarization of grid connected pumping installation at Mohisda, Zone-I & Zone-II PWSS in Purba Medinipore District under JJM programme under Midnapore Mechanical Division, PHE Dte.,SM/17762 Haldia Electrical Sub-Division Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. Sri Raju Pramanik, JE/Haldia Electrical Sub-Division. 17/03/2023 29/03/2023 17/09/2023 12/06/2023 1 0 16.61 0.00 0 0
84 Midnapore Mechanical Division PASCHIM MEDINIPUR Dantan - I Solarization of grid connected pumping installation Chakismilepur PWSS in Paschim Medinipore District under JJM programme under Midnapore Mechanical Division, PHE Dte.,SM/17763 Midnapur Mechanical Sub Division-I Sri Bikash Das, AE/Midnapur Mechanical Sub-Division-I Sri Bikas Pramanik, JE/Midnapur Mechanical Sub-Division-I 17/03/2023 29/03/2023 17/09/2023 12/06/2023 1 0 8.30 0.00 0 0
85 Midnapore Mechanical Division PURBA MEDINIPUR Mahisadal Solarization of grid connected pumping installation at Rangibasan PWSS in Purba Medinipore District under JJM programme under Midnapore Mechanical Division, PHE Dte.,SM/17764 Haldia Electrical Sub-Division Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. Sri Krishanu Mondal, JE/Haldia Electrical Sub-Division. 17/03/2023 29/03/2023 17/09/2023 12/06/2023 1 0 8.30 0.00 0 0
86 Midnapore Mechanical Division PASCHIM MEDINIPUR Daspur - I Solarization of grid connected pumping installation Rajnagar PWSS in Paschim Medinipore District under JJM programme under Midnapore Mechanical Division, PHE Dte.,SM/17766 Midnapur Mechanical Sub Division-I Sri Bikash Das, AE/Midnapur Mechanical Sub-Division-I Sri Mahadev Dutta, JE/Midnapur Mechanical Sub-Division-I 17/03/2023 29/03/2023 17/09/2023 12/06/2023 1 0 8.30 0.00 70 0
87 Midnapore Mechanical Division PURBA MEDINIPUR Egra - II Solarization of grid connected pumping installation at Madhabpur (Balighai) PWSS in Purba Medinipore District under JJM programme under Midnapore Mechanical Division, PHE Dte.,SM/17767 Haldia Electrical Sub-Division Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. Sri Sukanta Mondal, JE/Haldia Electrical Sub-Division. 17/03/2023 29/03/2023 17/09/2023 12/06/2023 1 0 8.30 0.00 0 0
88 Midnapore Mechanical Division PURBA MEDINIPUR Mahisadal Solarization of grid connected pumping installation at Kapaseria PWSS in Purba Medinipore District under JJM programme under Midnapore Mechanical Division, PHE Dte.,SM/17769 Haldia Electrical Sub-Division Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. Sri Krishanu Mondal, JE/Haldia Electrical Sub-Division. 17/03/2023 29/03/2023 17/09/2023 12/06/2023 1 0 8.30 0.00 0 0
89 Midnapore Mechanical Division PURBA MEDINIPUR Ramnagar - I Solarization of grid connected pumping installation at Haldia (Ramnagar)PWSS in Purba Medinipore District under JJM programme under Midnapore Mechanical Division, PHE Dte.,SM/17770 Haldia Electrical Sub-Division Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. Sri Ujjal Kumar Dey, JE/Haldia Electrical Sub-Division. 17/03/2023 29/03/2023 17/09/2023 12/06/2023 1 0 8.30 0.00 0 0
90 Midnapore Mechanical Division PURBA MEDINIPUR Nandigram - I Solarization of grid connected pumping installation at Manikpur PWSS in Purba Medinipore District under JJM programme under Midnapore Mechanical Division, PHE Dte.,SM/17771 Haldia Electrical Sub-Division Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. Sri Tanmoy Shee, JE/Haldia Electrical Sub-Division. 17/03/2023 29/03/2023 17/09/2023 12/06/2023 1 0 8.30 0.00 0 0
91 Midnapore Mechanical Division PURBA MEDINIPUR Nanda Kumar Solarization of grid connected pumping installation at Jalpai PWSS in Purba Medinipore District under JJM programme under Midnapore Mechanical Division, PHE Dte.,SM/17772 Haldia Electrical Sub-Division Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. Sri Tanmoy Shee, JE/Haldia Electrical Sub-Division. 17/03/2023 29/03/2023 17/09/2023 12/06/2023 1 0 8.30 0.00 0 0
92 Midnapore Mechanical Division PURBA MEDINIPUR Egra - I Solarization of grid connected pumping installation at Kudi PWSS in Purba Medinipore District under JJM programme under Midnapore Mechanical Division, PHE Dte.,SM/17773 Haldia Electrical Sub-Division Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. Sri Mrityunjoy Paria, JE/Haldia Electrical Sub-Division. 17/03/2023 29/03/2023 17/09/2023 12/06/2023 1 0 8.30 0.00 0 0
93 Midnapore Mechanical Division PURBA MEDINIPUR Panskura Solarization of grid connected pumping installation at Purba Bakulda PWSS in Purba Medinipore District under JJM programme under Midnapore Mechanical Division, PHE Dte.,SM/17774 Haldia Electrical Sub-Division Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. Sri Raju Pramanik, JE/Haldia Electrical Sub-Division. 17/03/2023 29/03/2023 17/09/2023 12/06/2023 1 0 8.30 0.00 0 0
94 Midnapore Mechanical Division PURBA MEDINIPUR Panskura Solarization of grid connected pumping installation at Haur PWSS in Purba Medinipore District under JJM programme under Midnapore Mechanical Division, PHE Dte.,SM/17775 Haldia Electrical Sub-Division Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. Sri Raju Pramanik, JE/Haldia Electrical Sub-Division. 17/03/2023 29/03/2023 17/09/2023 12/06/2023 1 0 8.30 0.00 0 0
95 Midnapore Mechanical Division PASCHIM MEDINIPUR Keshpur Rejuvenation of Electro-Mechanical components of Keshpur PWSS in the District of Paschim Medinipur under JJM programme.,SM/17776 Augmentation Midnapur Mechanical Sub Division-I Sri Bikash Das, AE/Midnapur Mechanical Sub-Division-I Sri Dablu Dutta, JE/Midnapur Mechanical Sub-Division-I 17/03/2023 29/03/2023 17/09/2023 12/06/2023 1 0 12.39 0.00 55 0
96 Midnapore Mechanical Division PURBA MEDINIPUR Moyna Solarization of grid connected pumping installation at Dona PWSS in Purba Medinipore District under JJM programme under Midnapore Mechanical Division, PHE Dte.,SM/17777 Haldia Electrical Sub-Division Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. Sri Krishanu Mondal, JE/Haldia Electrical Sub-Division. 17/03/2023 29/03/2023 17/09/2023 12/06/2023 1 0 16.61 0.00 0 0
97 Midnapore Mechanical Division PASCHIM MEDINIPUR Sabang Solarization of grid connected pumping installation Kolanda PWSS in Paschim Medinipore District under JJM programme under Midnapore Mechanical Division, PHE Dte.,SM/17778 Midnapur Mechanical Sub Division-I Sri Bikash Das, AE/Midnapur Mechanical Sub-Division-I Sri Mahadev Dutta, JE/Midnapur Mechanical Sub-Division-I 17/03/2023 29/03/2023 17/09/2023 12/06/2023 1 0 8.30 0.00 60 0
98 Midnapore Mechanical Division PURBA MEDINIPUR Moyna Solarization of grid connected pumping installation at Moyna, Zone-I & Zone-II PWSS in Purba Medinipore District under JJM programme under Midnapore Mechanical Division, PHE Dte.,SM/17782 Haldia Electrical Sub-Division Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. Sri Krishanu Mondal, JE/Haldia Electrical Sub-Division. 17/03/2023 29/03/2023 17/09/2023 12/06/2023 1 0 16.61 0.00 0 0
99 Midnapore Mechanical Division PURBA MEDINIPUR Ramnagar - I Solarization of grid connected pumping installation at Gobra PWSS in Purba Medinipore District under JJM programme under Midnapore Mechanical Division, PHE Dte.,SM/17783 Haldia Electrical Sub-Division Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. Sri Ujjal Kumar Dey, JE/Haldia Electrical Sub-Division. 17/03/2023 29/03/2023 17/09/2023 12/06/2023 1 0 8.30 0.00 0 0
100 Midnapore Mechanical Division PURBA MEDINIPUR Mahisadal Solarization of grid connected pumping installation at Rajarampur PWSS in Purba Medinipore District under JJM programme under Midnapore Mechanical Division, PHE Dte.,SM/17784 Haldia Electrical Sub-Division Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. Sri Krishanu Mondal, JE/Haldia Electrical Sub-Division. 17/03/2023 29/03/2023 17/09/2023 12/06/2023 1 0 8.30 0.00 0 0
101 Midnapore Mechanical Division PURBA MEDINIPUR Contai - I Solarization of grid connected pumping installation at Haipur PWSS in Purba Medinipore District under JJM programme under Midnapore Mechanical Division, PHE Dte.,SM/17786 Haldia Electrical Sub-Division Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. Sri Mrityunjoy Paria, JE/Haldia Electrical Sub-Division. 17/03/2023 29/03/2023 17/09/2023 12/06/2023 1 0 8.30 0.00 0 0
102 Midnapore Mechanical Division PURBA MEDINIPUR Ramnagar - II Solarization of grid connected pumping installation at Mandar PWSS in Purba Medinipore District under JJM programme under Midnapore Mechanical Division, PHE Dte,SM/17788 Haldia Electrical Sub-Division Sri Ujjal Kumar Dey, JE/Haldia Electrical Sub-Division.,Sri Krishanu Mondal, JE/Haldia Electrical Sub-Division. 17/03/2023 29/03/2023 17/09/2023 12/06/2023 1 0 8.30 0.00 0 0
103 Midnapore Mechanical Division PURBA MEDINIPUR Contai - III Solarization of grid connected pumping installation at Durmut PWSS in Purba Medinipore District under JJM programme under Midnapore Mechanical Division, PHE Dte.,SM/17789 Haldia Electrical Sub-Division Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. Sri Mrityunjoy Paria, JE/Haldia Electrical Sub-Division. 17/03/2023 29/03/2023 17/09/2023 12/06/2023 1 0 8.30 0.00 0 0
104 Midnapore Mechanical Division PURBA MEDINIPUR Mahisadal Solarization of grid connected pumping installation at Keshabpur Jalpai PWSS in Purba Medinipore District under JJM programme under Midnapore Mechanical Division, PHE Dte.,SM/17791 Haldia Electrical Sub-Division Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. Sri Krishanu Mondal, JE/Haldia Electrical Sub-Division. 17/03/2023 29/03/2023 17/09/2023 12/06/2023 1 0 8.30 0.00 0 0
105 Midnapore Mechanical Division PURBA MEDINIPUR Nanda Kumar Solarization of grid connected pumping installation at Khejurberia PWSS in Purba Medinipore District under JJM programme under Midnapore Mechanical Division, PHE Dte.,SM/17793 Haldia Electrical Sub-Division Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. Sri Tanmoy Shee, JE/Haldia Electrical Sub-Division. 17/03/2023 29/03/2023 17/09/2023 12/06/2023 1 0 8.30 0.00 0 0
106 Midnapore Mechanical Division PASCHIM MEDINIPUR Pingla Solarization of grid connected pumping installation Gobardhanpur PWSS in Paschim Medinipore District under JJM programme under Midnapore Mechanical Division, PHE Dte.,SM/17795 Midnapur Mechanical Sub Division-I Sri Bikash Das, AE/Midnapur Mechanical Sub-Division-I Sri Dablu Dutta, JE/Midnapur Mechanical Sub-Division-I 17/03/2023 29/03/2023 17/09/2023 12/06/2023 1 0 8.30 0.00 0 0
107 Midnapore Mechanical Division PASCHIM MEDINIPUR Salbani Solarization of grid connected pumping installation Kashijora PWSS in Paschim Medinipore District under JJM programme under Midnapore Mechanical Division, PHE Dte.,SM/17798 Midnapur Mechanical Sub Division-I Sri Bikash Das, AE/Midnapur Mechanical Sub-Division-I Sri Dablu Dutta, JE/Midnapur Mechanical Sub-Division-I 17/03/2023 29/03/2023 17/09/2023 12/06/2023 1 0 8.30 0.00 0 0
108 Midnapore Mechanical Division PURBA MEDINIPUR Mahisadal Solarization of grid connected pumping installation at Gopalpur PWSS in Purba Medinipore District under JJM programme under Midnapore Mechanical Division, PHE Dte.,SM/17800 Haldia Electrical Sub-Division Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. Sri Krishanu Mondal, JE/Haldia Electrical Sub-Division. 17/03/2023 29/03/2023 17/09/2023 12/06/2023 1 0 8.30 0.00 0 0
109 Midnapore Mechanical Division PURBA MEDINIPUR Panskura Solarization of grid connected pumping installation at Gobindanagar PWSS in Purba Medinipore District under JJM programme under Midnapore Mechanical Division, PHE Dte.,SM/17801 Haldia Electrical Sub-Division Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. Sri Raju Pramanik, JE/Haldia Electrical Sub-Division. 17/03/2023 29/03/2023 17/09/2023 12/06/2023 1 0 8.30 0.00 0 0
110 Midnapore Mechanical Division PURBA MEDINIPUR Egra - I Solarization of grid connected pumping installation at Kasbagola PWSS in Purba Medinipore District under JJM programme under Midnapore Mechanical Division, PHE Dte.,SM/17802 Haldia Electrical Sub-Division Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. Sri Mrityunjoy Paria, JE/Haldia Electrical Sub-Division. 17/03/2023 29/03/2023 17/09/2023 12/06/2023 1 0 8.30 0.00 0 0
111 Midnapore Mechanical Division PURBA MEDINIPUR Mahisadal Solarization of grid connected pumping installation at Natshallakhya, Zone-I PWSS in Purba Medinipore District under JJM programme under Midnapore Mechanical Division, PHE Dte.,SM/17803 Haldia Electrical Sub-Division Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. Sri Krishanu Mondal, JE/Haldia Electrical Sub-Division. 17/03/2023 29/03/2023 17/09/2023 12/06/2023 1 0 8.30 0.00 0 0
112 Midnapore Mechanical Division PURBA MEDINIPUR Nandigram - I Solarization of grid connected pumping installation at Tajpur PWSS in Purba Medinipore District under JJM programme under Midnapore Mechanical Division, PHE Dte.,SM/17804 Haldia Electrical Sub-Division Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. Sri Tanmoy Shee, JE/Haldia Electrical Sub-Division. 17/03/2023 29/03/2023 17/09/2023 12/06/2023 1 0 8.30 0.00 0 0
113 Midnapore Mechanical Division PURBA MEDINIPUR Panskura Solarization of grid connected pumping installation at Jagatpur PWSS in Purba Medinipore District under JJM programme under Midnapore Mechanical Division, PHE Dte.,SM/17805 Haldia Electrical Sub-Division Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. Sri Raju Pramanik, JE/Haldia Electrical Sub-Division. 17/03/2023 29/03/2023 17/09/2023 12/06/2023 1 0 8.30 0.00 0 0
114 Midnapore Mechanical Division PASCHIM MEDINIPUR Sabang Solarization of grid connected pumping installation Debhog PWSS in Paschim Medinipore District under JJM programme under Midnapore Mechanical Division, PHE Dte.,SM/17806 Midnapur Mechanical Sub Division-I Sri Bikash Das, AE/Midnapur Mechanical Sub-Division-I Sri Mahadev Dutta, JE/Midnapur Mechanical Sub-Division-I 17/03/2023 29/03/2023 17/09/2023 12/06/2023 1 0 8.30 0.00 0 0
115 Midnapore Mechanical Division PURBA MEDINIPUR Nanda Kumar Solarization of grid connected pumping installation at Kolsar PWSS in Purba Medinipore District under JJM programme under Midnapore Mechanical Division, PHE Dte.,SM/17807 Haldia Electrical Sub-Division Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. Sri Tanmoy Shee, JE/Haldia Electrical Sub-Division. 17/03/2023 29/03/2023 17/09/2023 12/06/2023 1 0 8.30 0.00 0 0
116 Midnapore Mechanical Division PURBA MEDINIPUR Sahid Matangini Solarization of grid connected pumping installation at Uttardalhara Zone-I & Zone-II PWSS in Purba Medinipore District under JJM programme under Midnapore Mechanical Division, PHE Dte.,SM/17809 Haldia Electrical Sub-Division Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. Sri Raju Pramanik, JE/Haldia Electrical Sub-Division. 17/03/2023 29/03/2023 17/09/2023 12/06/2023 1 0 16.61 0.00 0 0
117 Midnapore Mechanical Division PASCHIM MEDINIPUR Kharagpur - II Solarization of grid connected pumping installation Balarampur PWSS in Paschim Medinipore District under JJM programme under Midnapore Mechanical Division, PHE Dte.,SM/17810 Midnapur Mechanical Sub Division-I Sri Bikash Das, AE/Midnapur Mechanical Sub-Division-I JE/Midnapur Mechanical Sub-Division-I 17/03/2023 29/03/2023 17/09/2023 12/06/2023 1 0 8.30 0.00 0 0
118 Midnapore Mechanical Division PASCHIM MEDINIPUR Dantan - I Rejuvenation of Electro-Mechanical components of Chakismilepur PWSS in the District of Paschim Medinipur under JJM programme.,SM/17812 Augmentation Midnapur Mechanical Sub Division-I Sri Bikash Das, AE/Midnapur Mechanical Sub-Division-I Sri Bikas Pramanik, JE/Midnapur Mechanical Sub-Division-I 17/03/2023 29/03/2023 17/09/2023 12/06/2023 1 0 12.39 0.00 0 0
119 Midnapore Mechanical Division PURBA MEDINIPUR Haldia Solarization of grid connected pumping installation at Manoharpur PWSS in Purba Medinipore District under JJM programme under Midnapore Mechanical Division, PHE Dte.,SM/17813 Haldia Electrical Sub-Division Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. Sri Tanmoy Shee, JE/Haldia Electrical Sub-Division. 17/03/2023 29/03/2023 17/09/2023 12/06/2023 1 0 8.30 0.00 0 0
120 Midnapore Mechanical Division PURBA MEDINIPUR Potashpur - I Solarization of grid connected pumping installation at Kanakpur PWSS in Purba Medinipore District under JJM programme under Midnapore Mechanical Division, PHE Dte.,SM/17814 Haldia Electrical Sub-Division Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. Sri Sukanta Mondal, JE/Haldia Electrical Sub-Division. 17/03/2023 29/03/2023 17/09/2023 12/06/2023 1 0 8.30 0.00 0 0
121 Midnapore Mechanical Division PURBA MEDINIPUR Contai - I Solarization of grid connected pumping installation at Majna PWSS in Purba Medinipore District under JJM programme under Midnapore Mechanical Division, PHE Dte.,SM/17817 Haldia Electrical Sub-Division Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. Sri Mrityunjoy Paria, JE/Haldia Electrical Sub-Division. 17/03/2023 29/03/2023 17/09/2023 12/06/2023 1 0 8.30 0.00 0 0
122 Midnapore Mechanical Division PASCHIM MEDINIPUR Daspur - I Solarization of grid connected pumping installation Ranapur PWSS in Paschim Medinipore District under JJM programme under Midnapore Mechanical Division, PHE Dte.,SM/17819 Midnapur Mechanical Sub Division-I Sri Bikash Das, AE/Midnapur Mechanical Sub-Division-I Sri Mahadev Dutta, JE/Midnapur Mechanical Sub-Division-I 17/03/2023 29/03/2023 17/09/2023 12/06/2023 1 0 8.30 0.00 0 0
123 Midnapore Mechanical Division PASCHIM MEDINIPUR Garbeta - II Rejuvenation of Electro-Mechanical components of Suktajuri PWSS in the District of Paschim Medinipur under JJM programme.,SM/17820 Augmentation Midnapur Mechanical Sub Division-I Sri Bikash Das, AE/Midnapur Mechanical Sub-Division-I Sri Dablu Dutta, JE/Midnapur Mechanical Sub-Division-I 17/03/2023 29/03/2023 17/09/2023 12/06/2023 2 0 24.79 0.00 0 0
124 Midnapore Mechanical Division PASCHIM MEDINIPUR Ghatal Solarization of grid connected pumping installation Ranibazar PWSS in Paschim Medinipore District under JJM programme under Midnapore Mechanical Division, PHE Dte.,SM/17821 Midnapur Mechanical Sub Division-I Sri Bikash Das, AE/Midnapur Mechanical Sub-Division-I Sri Mahadev Dutta, JE/Midnapur Mechanical Sub-Division-I 17/03/2023 29/03/2023 17/09/2023 12/06/2023 1 0 8.30 0.00 0 0
125 Midnapore Mechanical Division PASCHIM MEDINIPUR Pingla Rejuvenation of Electro-Mechanical components of Gobardhanpur PWSS in the District of Paschim Medinipur under JJM programme.,SM/17822 Augmentation Midnapur Mechanical Sub Division-I Sri Bikash Das, AE/Midnapur Mechanical Sub-Division-I Sri Dablu Dutta, JE/Midnapur Mechanical Sub-Division-I 17/03/2023 29/03/2023 17/09/2023 12/06/2023 1 0 12.39 0.00 0 0
126 Midnapore Mechanical Division PURBA MEDINIPUR Potashpur - I Solarization of grid connected pumping installation at Golaranji PWSS in Purba Medinipore District under JJM programme under Midnapore Mechanical Division, PHE Dte.,SM/17823 Haldia Electrical Sub-Division Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. Sri Sukanta Mondal, JE/Haldia Electrical Sub-Division. 17/03/2023 29/03/2023 17/09/2023 12/06/2023 1 0 8.30 0.00 0 0
127 Midnapore Mechanical Division PURBA MEDINIPUR Ramnagar - II Solarization of grid connected pumping installation at Kanpur PWSS in Purba Medinipore District under JJM programme under Midnapore Mechanical Division, PHE Dte.,SM/17824 Haldia Electrical Sub-Division Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. Sri Ujjal Kumar Dey, JE/Haldia Electrical Sub-Division. 17/03/2023 29/03/2023 17/09/2023 12/06/2023 1 0 8.30 0.00 0 0
128 Midnapore Mechanical Division PASCHIM MEDINIPUR Salbani Solarization of grid connected pumping installation Jamboda Godamouli PWSS in Paschim Medinipore District under JJM programme under Midnapore Mechanical Division, PHE Dte.,SM/18113 Midnapur Mechanical Sub Division-I Sri Bikash Das, AE/Midnapur Mechanical Sub-Division-I Sri Dablu Dutta, JE/Midnapur Mechanical Sub-Division-I 17/03/2023 31/03/2023 17/09/2023 12/06/2023 1 0 8.30 0.00 0 0
129 Midnapore Mechanical Division PASCHIM MEDINIPUR Debra Solarization of grid connected pumping installation at Debra PWSS in Paschim Medinipore District under JJM programme under Midnapore Mechanical Division, PHE Dte,SM/18120 Midnapur Mechanical Sub Division-I Sri Bikash Das, AE/Midnapur Mechanical Sub-Division-I Sri Lab Das, JE/Midnapur Mechanical Sub-Division-I 15/03/2023 31/03/2023 15/09/2023 12/06/2023 1 0 8.30 0.00 0 0
Total 261 0 1,530.79 188.87   12