Sl. No. Division District Block Scheme Name Scheme Category Sub Division Name of AE entrusted Name of JE entrusted Date of Sanction Date of Commencement Target Date of Completion Date Of Updation Work Order Issued FHTCs Sanctioned Cost Payment Physical Progress (in %) Financial Progress (in %)
46 255 1,04,309 6,460.25 4,341.94   67
1 Raiganj Division UTTAR DINAJPUR Itahar Retrofitting of Functional household Tap connection (FHTC) under Nalbithi Madhabpur and adjoining Mouzas water supply scheme,SM/06723 Retrofitting Raiganj Sub-Division Assistant Engineer RSD 18/09/2020 16/10/2022 30/09/2024 28/08/2024 2 1,788 99.83 48.76 95 49
2 Raiganj Division UTTAR DINAJPUR Goalpokhar - II Retrofitting of Functional household Tap connection (FHTC) under Amalbari and adjoining Mouzas water supply scheme in Golapokhar-II Block,SM/07073 Retrofitting Islampur Sub-Division Assistant Engineer ISD 27/11/2020 11/12/2020 30/09/2024 28/08/2024 7 1,479 68.13 62.07 93 91
3 Raiganj Division UTTAR DINAJPUR Chopra Retrofitting of Functional household Tap connection (FHTC) under Pawakhali and adjoining Mouzas water supply scheme,SM/07141 Retrofitting Islampur Sub-Division Assistant Engineer ISD Junior Engineer, ISD 27/11/2020 11/12/2020 30/09/2024 28/08/2024 1 1,578 81.83 72.42 80 88
4 Raiganj Division UTTAR DINAJPUR Islampur Retrofitting of Functional household Tap connection (FHTC) under Matikunda and adjoining Mouzas water supply scheme in Islampur Block (Part-I,II,III),SM/07384 Retrofitting Islampur Sub-Division Assistant Engineer ISD Junior Engineer, ISD 27/11/2020 04/02/2021 30/09/2024 28/08/2024 4 841 51.74 40.78 96 79
5 Raiganj Division UTTAR DINAJPUR Kaliaganj Retrofitting of Functional household Tap connection (FHTC) under Phulatti and adjoining Mouzas water supply scheme in Kaliyaganj Block,SM/07385 Retrofitting Raiganj Sub-Division Assistant Engineer RSD Junior Engineer, RSD 27/11/2020 18/06/2021 30/09/2024 28/08/2024 8 1,481 88.74 55.27 99 62
6 Raiganj Division UTTAR DINAJPUR Raiganj Retrofitting of functional Household Tap Connections (FHTC) under 10 nos. different schemes and Adj. Mouzas Water Supply Scheme in different block,SM/07389 Retrofitting Islampur Sub-Division Assistant Engineer HQ,Assistant Engineer ISD,Assistant Engineer RSD 21/12/2020 18/06/2021 30/09/2024 28/08/2024 35 26,407 1,512.60 1,092.75 95 72
7 Raiganj Division UTTAR DINAJPUR Chopra Retrofitting of functional Household Tap Connections (FHTC) under 19 nos. different schemes and Adj. Mouzas Water Supply Scheme in different block,SM/07390 Retrofitting Islampur Sub-Division Assistant Engineer HQ,Assistant Engineer ISD,Assistant Engineer RSD 21/12/2020 18/06/2021 30/09/2024 28/08/2024 47 44,879 2,444.58 1,633.73 90 67
8 Raiganj Division UTTAR DINAJPUR Arrangement of W/S by Type-IB solar power operated pumping machinery for Anganwadi Centers having no electrical grid power connections and within the command area of PWSS for 162 Nos AWCs.,SM/07933 Anganwadi Raiganj Sub-Division Assistant Engineer HQ,Assistant Engineer RSD Junior Engineer, RSD 19/01/2021 24/06/2021 16/11/2023 07/07/2023 2 9,023 222.19 199.14 95 90
9 Raiganj Division UTTAR DINAJPUR Chopra Retrofitting of Functional household Tap connection (FHTC) under 4 Nos. different Schemes and their adjoining Mouzas water supply scheme in different Block under Raiganj Division, PHE Dte,SM/07977 Retrofitting Raiganj Sub-Division Junior Engineer, ISD ,Junior Engineer, RSD 22/01/2021 18/06/2021 30/09/2024 28/08/2024 13 9,907 502.08 350.71 95 70
10 Raiganj Division UTTAR DINAJPUR Itahar Laying of additional pipe line for retrofitting of Joyhat WSS for installation of FHTC.,SM/09114 Retrofitting Raiganj Sub-Division Assistant Engineer RSD Junior Engineer, RSD 29/10/2021 12/11/2021 30/09/2024 28/08/2024 25 0 13.00 6.62 80 51
11 Raiganj Division UTTAR DINAJPUR Chopra Laying of additional pipe line for retrofitting of Dakshin Kundal Pukur for installation of FHTC.,SM/09120 Retrofitting Islampur Sub-Division Assistant Engineer ISD Junior Engineer, ISD 29/10/2021 24/12/2021 30/09/2024 28/08/2024 1 0 13.59 3.57 46 26
12 Raiganj Division UTTAR DINAJPUR Chopra Laying of additional pipe line for retrofitting of Ghirnigaonfor installation of FHTC.,SM/09122 Retrofitting Islampur Sub-Division Assistant Engineer ISD Junior Engineer, ISD 29/10/2021 12/11/2021 30/09/2024 28/08/2024 1 0 92.44 37.36 85 40
13 Raiganj Division UTTAR DINAJPUR Goalpokhar - I Laying of additional pipe line for retrofitting of Goagaon for installation of FHTC.,SM/09123 Retrofitting Islampur Sub-Division Assistant Engineer ISD Junior Engineer, ISD 29/10/2021 12/11/2021 30/09/2024 28/08/2024 1 0 3.47 1.73 99 50
14 Raiganj Division UTTAR DINAJPUR Islampur Laying of additional pipe line for retrofitting of Gunabari for installation of FHTC.,SM/09124 Retrofitting Islampur Sub-Division Assistant Engineer ISD Junior Engineer, ISD 29/10/2021 17/11/2021 30/09/2024 28/08/2024 1 0 6.72 1.67 95 25
15 Raiganj Division UTTAR DINAJPUR Goalpokhar - I Laying of additional pipe line for retrofitting of Intia WSS for installation of FHTC (Part-A & B) .,SM/09125 Retrofitting Islampur Sub-Division Assistant Engineer ISD Junior Engineer, ISD 29/10/2021 12/11/2021 30/09/2024 28/08/2024 2 0 20.85 14.11 95 68
16 Raiganj Division UTTAR DINAJPUR Goalpokhar - I Laying of additional pipe line for retrofitting of Jaingaon WSS for installation of FHTC.,SM/09126 Retrofitting Islampur Sub-Division Assistant Engineer ISD Junior Engineer, ISD 29/10/2021 12/11/2021 30/09/2024 28/08/2024 1 0 45.99 44.16 85 96
17 Raiganj Division UTTAR DINAJPUR Goalpokhar - I Laying of additional pipe line for retrofitting of Mahua WSS for installation of FHTC (Part-I/II/III/IV).,SM/09129 Retrofitting Islampur Sub-Division Assistant Engineer ISD Junior Engineer, ISD 29/10/2021 12/11/2021 30/09/2024 28/08/2024 5 0 41.15 31.74 77 77
18 Raiganj Division UTTAR DINAJPUR Islampur Laying of additional pipe line for retrofitting of Matikunda (Part-I/II) WSS for installation of FHTC.,SM/09130 Retrofitting Islampur Sub-Division Assistant Engineer ISD Junior Engineer, ISD 29/10/2021 24/12/2021 30/09/2024 28/08/2024 1 0 11.88 5.89 50 50
19 Raiganj Division UTTAR DINAJPUR Chopra Laying of additional pipe line for retrofitting of Pawakhali WSS for installation of FHTC.,SM/09131 Retrofitting Islampur Sub-Division Assistant Engineer ISD Junior Engineer, ISD 29/10/2021 12/11/2021 30/09/2024 28/08/2024 2 0 21.71 15.27 85 70
20 Raiganj Division UTTAR DINAJPUR Goalpokhar - I Laying of additional pipe line for retrofitting of Pokheria WSS for installation of FHTC.,SM/09132 Retrofitting Islampur Sub-Division Assistant Engineer ISD Junior Engineer, ISD 29/10/2021 12/11/2021 30/09/2024 28/08/2024 1 0 3.92 1.96 95 50
21 Raiganj Division UTTAR DINAJPUR Chopra Laying of additional pipe line for retrofitting of Barobilla for installation of FHTC.,SM/09135 Retrofitting Islampur Sub-Division Assistant Engineer ISD Junior Engineer, ISD 29/10/2021 12/11/2021 30/09/2024 28/08/2024 1 0 2.23 0.00 2 0
22 Raiganj Division UTTAR DINAJPUR Chopra Laying of additional pipe line for retrofitting of Bhagabati for installation of FHTC.,SM/09139 Retrofitting Islampur Sub-Division Assistant Engineer ISD Junior Engineer, ISD 29/10/2021 12/11/2021 30/09/2024 28/08/2024 1 0 2.84 0.00 82 0
23 Raiganj Division UTTAR DINAJPUR Itahar Laying of additional pipe line for retrofitting of Kaliganj WSS for installation of FHTC.,SM/09149 Retrofitting Raiganj Sub-Division Assistant Engineer RSD Junior Engineer, RSD 29/10/2021 03/11/2021 30/09/2024 28/08/2024 1 0 7.36 6.18 95 84
24 Raiganj Division UTTAR DINAJPUR Itahar Laying of additional pipe line for retrofitting of Gopalpur for installation of FHTC.,SM/09151 Retrofitting Raiganj Sub-Division Assistant Engineer RSD Junior Engineer, RSD 29/10/2021 03/11/2021 30/09/2024 28/08/2024 1 0 9.49 3.72 95 39
25 Raiganj Division UTTAR DINAJPUR Raiganj Retrofitting of FHTC under Kasba [NM] and adjoining mouzas WSS.,SM/09171 Retrofitting Raiganj Sub-Division Assistant Engineer RSD Junior Engineer, RSD 28/10/2021 02/11/2021 30/09/2024 28/08/2024 5 280 17.94 14.27 98 80
26 Raiganj Division UTTAR DINAJPUR Itahar Retrofitting of Functional House Hold Tap Connections (FHTC) under under Kasba [Itahar] and adjoining mouzas Water Supply Scheme In Itahar Block Under Raiganj Division, P. H. E. Dte.,SM/09173 Retrofitting Raiganj Sub-Division Assistant Engineer RSD Junior Engineer, RSD 28/10/2021 02/11/2021 30/09/2024 28/08/2024 5 375 24.36 20.23 97 83
27 Raiganj Division UTTAR DINAJPUR Itahar Retrofitting of Functional House Hold Tap Connections (FHTC) under Itahar and adjoining mouzas Water Supply Scheme In Itahar Block Under Raiganj Division, P. H. E. Dte.,SM/09174 Retrofitting Raiganj Sub-Division Assistant Engineer RSD Junior Engineer, RSD 28/10/2021 02/11/2021 30/09/2024 28/08/2024 7 855 55.54 29.08 96 52
28 Raiganj Division UTTAR DINAJPUR Hemtabad Retrofitting of Functional House Hold Tap Connections (FHTC) under Hemtabad and adjoining mouzas Water Supply Scheme In Hemtabad Block Under Raiganj Division, P. H. E. Dte.,SM/09175 Retrofitting Raiganj Sub-Division Assistant Engineer RSD Junior Engineer, RSD 28/10/2021 02/11/2021 30/09/2024 28/08/2024 7 775 50.13 40.87 99 82
29 Raiganj Division UTTAR DINAJPUR Chopra Retrofitting of Functional House Hold Tap Connections (FHTC) under Chopra and adjoining mouzas Water Supply Scheme In Chopra Block Under Raiganj Division, P. H. E. Dte.,SM/09182 Retrofitting Islampur Sub-Division Assistant Engineer ISD Junior Engineer, ISD 28/10/2021 02/11/2021 30/09/2024 28/08/2024 7 815 52.94 30.72 94 58
30 Raiganj Division UTTAR DINAJPUR Goalpokhar - II Retrofitting of Functional House Hold Tap Connections (FHTC) under Chakulia and adjoining mouzas Water Supply Scheme In Goalpokhor-II Block Under Raiganj Division, P. H. E. Dte.,SM/09183 Retrofitting Islampur Sub-Division Assistant Engineer ISD Junior Engineer, ISD 28/10/2021 02/11/2021 30/09/2024 28/08/2024 3 455 29.49 11.39 81 39
31 Raiganj Division UTTAR DINAJPUR Goalpokhar - II Retrofitting of Functional House Hold Tap Connections (FHTC) under Dharam Zone-I and adjoining mouzas Water Supply Scheme In Goalpokhor-I Block Under Raiganj Division, P. H. E. Dte.,SM/09184 Retrofitting Islampur Sub-Division Assistant Engineer ISD Junior Engineer, ISD 28/10/2021 02/11/2021 30/09/2024 28/08/2024 7 458 29.76 19.39 86 65
32 Raiganj Division UTTAR DINAJPUR Goalpokhar - I Retrofitting of Functional House Hold Tap Connections (FHTC) under Goalpukhur and adjoining mouzas Water Supply Scheme In Goalpokhor-I Block Under Raiganj Division, P. H. E. Dte.,SM/09186 Retrofitting Islampur Sub-Division Assistant Engineer ISD Junior Engineer, ISD 28/10/2021 02/11/2021 30/09/2024 28/08/2024 2 388 25.17 11.07 86 44
33 Raiganj Division UTTAR DINAJPUR Islampur Retrofitting of Functional House Hold Tap Connections (FHTC) under Ramganj and adjoining mouzas Water Supply Scheme In Islampur Block Under Raiganj Division, P. H. E. Dte.,SM/09187 Retrofitting Islampur Sub-Division Assistant Engineer ISD Junior Engineer, ISD 28/10/2021 02/11/2021 30/09/2024 28/08/2024 5 1,240 80.61 25.53 72 32
34 Raiganj Division UTTAR DINAJPUR Karandighi Retrofitting of Functional House Hold Tap Connections (FHTC) under Khanta [Rasakhowa] and adjoining mouzas Water Supply Scheme In Karandighi Block Under Raiganj Division, P. H. E. Dte.,SM/09189 Retrofitting Islampur Sub-Division Assistant Engineer ISD Junior Engineer, ISD 28/10/2021 02/11/2021 30/09/2024 28/08/2024 6 410 26.54 20.89 95 79
35 Raiganj Division UTTAR DINAJPUR Goalpokhar - I Retrofitting of Functional House Hold Tap Connections (FHTC) under Panjipara and adjoining mouzas Water Supply Scheme In Goalpokhor-I Block Under Raiganj Division, P. H. E. Dte.,SM/09190 Retrofitting Islampur Sub-Division Assistant Engineer ISD Junior Engineer, ISD 28/10/2021 02/11/2021 30/09/2024 28/08/2024 5 725 47.07 20.19 96 43
36 Raiganj Division UTTAR DINAJPUR Chopra Restoration of Pipe Line for providing FHTC at Bhagabati Piped Water Supply Scheme under Islampur Sub-Division, P.H.E. Dte. (Phase-II),SM/10424 Retrofitting Islampur Sub-Division Assistant Engineer ISD Junior Engineer, ISD 08/04/2022 12/05/2022 30/09/2024 28/08/2024 2 0 14.48 11.40 73 79
37 Raiganj Division UTTAR DINAJPUR Itahar Restoration of Pipe line for providing FHTC for Shridharpur Water Supply Scheme under Itahar Block under Raiganj Division, P.H.E. Dte. (Phase-II),SM/10442 Retrofitting Raiganj Sub-Division Assistant Engineer RSD Junior Engineer, RSD 12/04/2022 17/02/2023 30/09/2024 28/08/2024 1 0 7.80 2.15 90 28
38 Raiganj Division UTTAR DINAJPUR Itahar Restoration of Pipe line for providing FHTC for Mahammadpur Water Supply Scheme under Itahar Block under Raiganj Division, P.H.E. Dte. (Phase-II),SM/10444 Retrofitting Raiganj Sub-Division Assistant Engineer RSD Junior Engineer, RSD 12/04/2022 17/03/2023 30/09/2024 28/08/2024 1 0 10.70 5.35 90 50
39 Raiganj Division UTTAR DINAJPUR Raiganj Restoration of Pipe line for providing FHTC for Pirojpur Water Supply Scheme under Raiganj Block under Raiganj Division, P.H.E. Dte. in the district of Uttar Dinajpur (Phase-II),SM/10445 Retrofitting Raiganj Sub-Division Assistant Engineer RSD Junior Engineer, RSD 12/04/2022 24/06/2022 30/09/2024 28/08/2024 2 0 101.69 25.68 40 25
40 Raiganj Division UTTAR DINAJPUR Goalpokhar - I Restoration of Pipe Line for providing FHTC of Intia Piped Water Supply Scheme for installation of FHTC under Raiganj Division, P.H.E. Dte. (Phase-II),SM/10447 Retrofitting Islampur Sub-Division Assistant Engineer ISD Junior Engineer, ISD 12/04/2022 12/05/2022 30/09/2024 28/08/2024 1 0 6.79 2.92 50 43
41 Raiganj Division UTTAR DINAJPUR Goalpokhar - I Restoration of Pipe Line for providing FHTC at Pokharia Piped Water Supply Scheme under Islampur Sub-Division, P.H.E. Dte. (Phase-II),SM/10449 Retrofitting Islampur Sub-Division Assistant Engineer ISD Junior Engineer, ISD 11/04/2022 12/05/2022 30/09/2024 28/08/2024 1 0 7.24 3.62 60 50
42 Raiganj Division UTTAR DINAJPUR Kaliaganj Restoration of Pipe line for providing FHTC for Mahinagar Water Supply Scheme under Kaliyaganj Block under Raiganj Division, P.H.E. Dte. in the district of Uttar Dinajpur (Phase-II),SM/10498 Retrofitting Raiganj Sub-Division Assistant Engineer RSD Junior Engineer, RSD 13/04/2022 17/02/2023 30/09/2024 28/08/2024 1 0 9.85 3.04 2 31
43 Raiganj Division UTTAR DINAJPUR Kaliaganj Extention & Restoration of Pipe Line in connection with providing FHTC under the command area of 13(Thirteen) Nos. different schemes under Raiganj Division P.H.E. Dte.,SM/10545 Augmentation Islampur Sub-Division Assistant Engineer HQ,Assistant Engineer ISD,Assistant Engineer RSD 18/04/2022 12/05/2022 30/09/2024 28/08/2024 13 0 283.68 269.30 63 95
44 Raiganj Division UTTAR DINAJPUR Goalpokhar - I Restoration of Pipe Line for providing FHTC at Jaingaon Piped Water Supply Scheme under Islampur Sub-Division, P.H.E. Dte. (Phase-II),SM/10547 Retrofitting Islampur Sub-Division Assistant Engineer ISD Junior Engineer, ISD 18/04/2022 12/05/2022 30/09/2024 28/08/2024 1 0 14.12 6.33 46 45
45 Raiganj Division UTTAR DINAJPUR Itahar Source Augmentation for Chandol Piped Water Supply Scheme under Itahar Block in the District of Uttar Dinajpur under Raiganj Division P.H.E. Dte.,SM/13021 Augmentation Raiganj Sub-Division Assistant Engineer - I,Assistant Engineer RSD Junior Engineer, RSD ,Junior Engineer-06 28/09/2022 28/10/2022 30/09/2024 28/11/2024 4 150 58.49 19.89 68 34
46 Raiganj Division UTTAR DINAJPUR Islampur Replacement T/W for 4 Nos. water supply scheme.,SM/18227 Augmentation 16/03/2023 17/03/2023 30/09/2024 29/08/2024 5 0 137.50 19.02 36 14