H2- Exception Report on Scheme

Update Data
Rs. in Lakh
Sl. No. Division District Block Scheme Name Scheme Category Sub Division Name of AE entrusted Name of JE entrusted Date of Sanction Date of Commencement Target Date of Completion Date Of Updation Work Order Issued FHTCs Sanctioned Cost Payment Physical Progress (in %) Financial Progress (in %)
301 3,366 6,95,374 2,16,367.43 86,544.68   40
1 Burdwan Division PURBA BARDHAMAN Kalna-I Providing Functional Household Tap Connection (FHTC) under the command area of Dharma Danga Piped Water Supply Scheme,SM/07545 Retrofitting Kalna Sub-division Assistant Engineer 31/12/2020 19/02/2018 30/06/2025 25/03/2024 14 1,555 73.51 52.98 80 72
2 Burdwan Division PURBA BARDHAMAN Jamalpur Providing Functional Household Tap Connection (FHTC) by retrofitting withinthe command area of Gopikantapur Piped Water Supply Scheme at Jamalpur Block,SM/07775 Retrofitting Katwa Sub-Division AE(HQs), Burdwan Division, PHE Dte.,Assistant Engineer 08/01/2021 20/03/2017 31/12/2025 25/03/2024 15 2,550 120.55 68.48 75 57
3 Burdwan Division PURBA BARDHAMAN Jamalpur Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Balarampur Piped Water Supply Scheme at Jamalpur Block,SM/07776 Retrofitting Burdwan Sadar Sub-Division Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. RWS_JAMALPUR 08/01/2021 04/05/2018 31/08/2025 25/03/2024 7 2,615 123.62 78.77 65 64
4 Burdwan Division PURBA BARDHAMAN Bhatar Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Eruar Piped Water Supply Scheme at Bhatar Block,SM/07780 Retrofitting Durgapur Sub-DIvision Assistant Engineer, Durgapur Sub Division, P.H.E. Dte 08/01/2021 15/04/2013 31/08/2025 25/03/2024 15 5,098 297.21 166.80 70 56
5 Burdwan Division PURBA BARDHAMAN Jamalpur Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Mahishgaria Piped Water Supply Scheme at Jamalpur Block,SM/07799 Retrofitting Burdwan Division AE(HQs), Burdwan Division, PHE Dte. 07/01/2021 31/01/2020 30/09/2025 25/03/2024 4 2,007 67.65 16.66 95 25
6 Burdwan Division PURBA BARDHAMAN Mangolkote Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Gopalpur Piped Water Supply Scheme,SM/07800 Retrofitting Katwa Sub-Division Assistant Engineer 07/01/2021 08/02/2022 31/12/2023 12/06/2023 7 1,910 90.29 20.41 80 23
7 Burdwan Division PURBA BARDHAMAN Jamalpur Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Sahhosenpur Piped Water Supply Scheme at Jamalpur Block,SM/07813 Retrofitting Burdwan Sadar Sub-Division Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. RWS_JAMALPUR 08/01/2021 04/09/2018 31/12/2025 25/03/2024 19 2,942 139.08 85.67 80 62
8 Burdwan Division PURBA BARDHAMAN Jamalpur Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Kanshra Piped Water Supply Scheme at Jamalpur Block,SM/07816 Retrofitting Burdwan Division AE(HQs), Burdwan Division, PHE Dte. 08/01/2021 03/01/2018 31/12/2025 25/03/2024 17 2,571 109.06 86.04 80 79
9 Burdwan Division PURBA BARDHAMAN Memari-I Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Alipur Piped Water Supply Scheme,SM/07819 Retrofitting Burdwan Sadar Sub-Division Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE 08/01/2021 16/07/2014 31/12/2025 25/03/2024 5 3,993 257.15 55.40 80 22
10 Burdwan Division PURBA BARDHAMAN Raina-II Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Keunta Piped Water Supply Scheme,SM/07820 Retrofitting Burdwan Sadar Sub-Division Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. 08/01/2021 02/02/2021 31/07/2025 25/03/2024 12 2,176 141.29 128.16 80 91
11 Burdwan Division PURBA BARDHAMAN Purbasthali-II Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Krishnabati Piped Water Supply Scheme at Purbasthali-II Block,SM/07827 Retrofitting Kalna Sub-division Assistant Engineer 08/01/2021 31/01/2021 31/03/2025 25/03/2024 5 1,969 126.36 111.35 90 88
12 Burdwan Division PURBA BARDHAMAN Burdwan-I Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of ISUFABAD Piped Water Supply Scheme ,SM/07860 Retrofitting Burdwan Sadar Sub-Division Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. 14/01/2021 02/02/2021 30/06/2025 25/03/2024 7 1,853 115.29 14.63 80 13
13 Burdwan Division PURBA BARDHAMAN Jamalpur Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of ABUJHATI Piped Water Supply Scheme at Jamalpur Block,SM/07861 Retrofitting Burdwan Sadar Sub-Division Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. RWS_JAMALPUR 14/01/2021 17/09/2013 30/09/2025 25/03/2024 15 3,926 253.82 303.67 80 120
14 Burdwan Division PURBA BARDHAMAN Jamalpur Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of MADHABPUR Piped Water Supply Scheme ,SM/07862 Retrofitting Burdwan Sadar Sub-Division Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. RWS_JAMALPUR 14/01/2021 12/03/2013 31/12/2025 25/03/2024 23 2,107 136.50 134.17 80 98
15 Burdwan Division PURBA BARDHAMAN Bhatar Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Kashipur Piped Water Supply Scheme at Bhatar Block,SM/07868 Retrofitting Durgapur Sub-DIvision Assistant Engineer, Durgapur Sub Division, P.H.E. Dte 14/01/2021 14/05/2013 31/12/2025 25/03/2024 16 3,050 249.54 84.50 50 34
16 Burdwan Division PURBA BARDHAMAN Purbasthali-II Providing Functional Household Tap Connection (FHTC) by retrofitting along with intake jetty protection and minor repair of WTP at Surface Water Based Piped Water Supply Scheme for Arsenic affected areas of Purbasthali-II Block,SM/08030 Retrofitting Kalna Sub-division Assistant Engineer 25/01/2021 31/01/2021 31/03/2025 25/03/2024 21 35,132 1,902.40 2,183.26 45 115
17 Burdwan Division PURBA BARDHAMAN Memari-I Rretrofitting wroks for Providing Functional Household Tap Connection (FHTC) within the commend area of RASULPUR Piped Water Supply Scheme,SM/08031 Retrofitting Burdwan Sadar Sub-Division Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE 25/01/2021 16/04/2014 31/12/2025 25/03/2024 9 5,077 301.39 430.70 30 143
18 Burdwan Division PURBA BARDHAMAN Bhatar Rretrofitting wroks for Providing Functional Household Tap Connection (FHTC) within the commend area of Bhatar Piped Water Supply Scheme Block-Bhatar,SM/08033 Retrofitting Durgapur Sub-DIvision Assistant Engineer, Durgapur Sub Division, P.H.E. Dte 25/01/2021 31/01/2021 31/03/2025 25/03/2024 40 6,580 1,100.67 499.63 70 45
19 Burdwan Division PURBA BARDHAMAN Jamalpur Providing Functional Household Tap Connection (FHTC) retrofitting in the command area of of Nabagram Piped Water Supply Scheme at Jamalpur Block,SM/08101 Retrofitting Burdwan Sadar Sub-Division Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. RWS_JAMALPUR 19/02/2021 05/06/2015 31/03/2025 25/03/2024 7 7,097 402.29 279.16 55 69
20 Burdwan Division PURBA BARDHAMAN Burdwan-I Providing Functional Household Tap Connection (FHTC) retrofitting in the command area of of Rayan Piped Water Supply Scheme,SM/08102 Retrofitting Burdwan Sadar Sub-Division Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. 19/02/2021 22/08/2014 31/12/2025 25/03/2024 10 8,834 489.24 187.96 60 38
21 Burdwan Division PURBA BARDHAMAN Kalna-I Retrofitting wroks for Providing Functional Household Tap Connection (FHTC) within the command area of of Nandai and adj.Mouzas Piped Water Supply Scheme, Block Kalna-I, District Purba Bardhaman,SM/08104 Retrofitting Kalna Sub-division Assistant Engineer 19/02/2021 28/02/2021 31/08/2025 25/03/2024 15 5,704 365.23 238.56 60 65
22 Burdwan Division PURBA BARDHAMAN Bhatar Retrofitting wroks for Providing Functional Household Tap Connection (FHTC) within the command area of of Amarun Piped Water Supply Scheme, Block Bhatar, District Purba Bardhaman,SM/08105 Retrofitting Durgapur Sub-DIvision Assistant Engineer, Durgapur Sub Division, P.H.E. Dte 19/02/2021 25/04/2014 31/07/2025 25/03/2024 18 5,098 311.16 213.32 40 69
23 Burdwan Division PURBA BARDHAMAN Jamalpur Providing Functional Household Tap connection (FHTC) by retrofitting within the command area of AJHAPUR Piped Water Supply Scheme at Jamalpur Block under Burdwan Division, P.H.E. DTE.,SM/08701 Retrofitting Burdwan Sadar Sub-Division Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. RWS_JAMALPUR 03/09/2021 17/12/2015 31/12/2025 25/03/2024 16 5,237 505.33 123.01 70 24
24 Burdwan Division PURBA BARDHAMAN Jamalpur Providing Functional Household Tap connection (FHTC) by retrofitting within the command area of Antpara Piped Water Supply Scheme at Jamalpur Block under Burdwan Division, P.H.E. DTE.,SM/08703 Retrofitting Burdwan Division AE(HQs), Burdwan Division, PHE Dte. JE/RWS/JAMALPUR 03/09/2021 23/11/2015 31/03/2025 25/03/2024 33 3,098 196.29 80.80 75 41
25 Burdwan Division PURBA BARDHAMAN Memari-I Providing Functional House hold Tap Connection (FHTC) by retrofitting within the command area of Bagila piped Water Supply Scheme at Memari-I Block under Burdwan Division, P.H.E. DTE.,SM/08704 Retrofitting Burdwan Sadar Sub-Division Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE 03/09/2021 09/06/2021 31/03/2025 25/03/2024 17 4,909 267.25 135.32 75 51
26 Burdwan Division PURBA BARDHAMAN Kalna-I Providing Functional House hold Tap Connection (FHTC) by retrofitting at Jotshyam, Jurepar, Kadipur, Medgachi, Muragachha, Naopara, Ramanandapur mouzas within the command area of Manikhar piped Water Supply Scheme at Mangolkote Block under Burdwan Divisio,SM/08712 Retrofitting Kalna Sub-division Assistant Engineer 03/09/2021 13/10/2013 31/07/2025 25/03/2024 5 2,643 147.70 120.17 90 81
27 Burdwan Division PURBA BARDHAMAN Memari-II AUGMENTATION OF GROUND WATER BASED PARHATI PWSS TO ACCOMMODATE FHTC IN MEMARI-II BLOCK UNDER KATWA SUB DIVISION OF BURDWAN DIVISION IN PURBA BURDWAN DISTRICT,SM/08998 Augmentation Burdwan Sadar Sub-Division Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER RWS BURDWAN SUB-DIVISION PHE DTE 29/10/2021 16/11/2021 31/07/2025 25/03/2024 9 2,744 497.47 477.05 99 96
28 Burdwan Division PURBA BARDHAMAN Kalna-II Augmentation of ANUKHAL PWSS for providing Functional Household Tap Connection (FHTC) KALNA-II block under KALNA Sub Division of Burdwan Division in Purba Bardhaman District,SM/09403 Augmentation Kalna Sub-division Assistant Engineer 17/11/2021 16/12/2021 31/03/2025 25/03/2024 12 657 651.77 467.68 40 72
29 Burdwan Division PURBA BARDHAMAN Khandaghosh Augmentation of ground water based KHANDOGHOSH PWSS to accommodate FHTC in Khandoghosh block under Burdwan Sub Division of Burdwan Division in Purba Bardhaman District,SM/09404 Augmentation Burdwan Sadar Sub-Division Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE 17/11/2021 15/12/2021 31/07/2025 25/03/2024 12 4,677 851.60 791.14 99 93
30 Burdwan Division PURBA BARDHAMAN Ketugram-II Augmentation of ground water based BAHARAN-BIRHIMPUR PWSS to accommodate FHTC in Ketugram-II block under Katwa Sub Division of Burdwan Division in Purba Bardhaman District,SM/09406 Augmentation Katwa Sub-Division Assistant Engineer 17/11/2021 15/12/2021 31/12/2025 25/03/2024 6 2,045 316.97 307.73 99 97
31 Burdwan Division PURBA BARDHAMAN Raina-I Augmentation of ground water based SEHARA PWSS to accommodate FHTC in RAINA-I Block under Burdwan Suv Division of Burdwan Division in Purba Bardhaman,SM/09408 Augmentation Burdwan Sadar Sub-Division Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. 17/11/2021 17/12/2021 31/07/2025 25/03/2024 8 2,829 495.29 495.15 65 100
32 Burdwan Division PURBA BARDHAMAN Purbasthali-II Augmentation of SINHARI PWSS for providing functional household tap conncetion FHTC in Purbasthali-II block under Burdwan Division in Purba Bardhaman District,SM/09410 Augmentation Kalna Sub-division Assistant Engineer 17/11/2021 16/12/2021 31/03/2025 25/03/2024 11 3,077 697.69 398.72 80 57
33 Burdwan Division PURBA BARDHAMAN Purbasthali-I Augmentation of Ganganandapur PWSS for providing FHTC.,SM/09411 Augmentation Kalna Sub-division Assistant Engineer 17/11/2021 15/12/2021 31/03/2025 25/03/2024 23 2,940 808.85 625.64 65 77
34 Burdwan Division PURBA BARDHAMAN Katwa-II Augmentation of ground water based SINGI PWSS to accommodate FHTC in Katwa-II block under Katwa Sub Division of Burdwan Division in Purba Bardhaman District,SM/09412 Augmentation Katwa Sub-Division Assistant Engineer 17/11/2021 12/12/2021 31/12/2025 25/03/2024 7 4,088 537.66 405.18 92 75
35 Burdwan Division PURBA BARDHAMAN Manteswar Augmentation of MANTESWAR PWSS for providing functional household tap connection FHTC in Manteswar block under Burdwan Division in Purba Bardhaman District,SM/09414 Augmentation Kalna Sub-division Assistant Engineer 17/11/2021 17/12/2021 31/08/2025 25/03/2024 10 2,613 487.81 387.42 85 79
36 Burdwan Division PURBA BARDHAMAN Purbasthali-I DETAILED PROJECT REPORT FOR AUGMENTATION OF DOGACHIA PWSS FOR PROVIDING FUNCTIONAL HOUSEHOLD TAP CONNECTION (FHTC) PURBASTHALI-I BLOCK PURBA BARDHAMAN WEST BENGAL,SM/09415 Augmentation Kalna Sub-division Assistant Engineer 17/11/2021 15/12/2021 31/03/2025 25/03/2024 13 1,667 443.00 314.14 80 71
37 Burdwan Division PURBA BARDHAMAN Purbasthali-I Augmentation of CHAMPAHATI PWSS for providing functional household tap connection FHTC in Purbasthali-I block under Burdwan Division in Purba Bardhaman District,SM/09416 Augmentation Kalna Sub-division Assistant Engineer 17/11/2021 17/12/2021 31/07/2025 25/03/2024 13 1,935 563.41 443.98 85 79
38 Burdwan Division PURBA BARDHAMAN Burdwan-I Augmentation of ground water based NABABHAT PWSS to accommodate FHTC in BURDWAN-I block under Burdwan Sub Division of Burdwan Division in Purba Bardhaman District ,SM/09489 Augmentation Burdwan Sadar Sub-Division ASSISTANT ENGINEER,Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. Junior Engineer 19/11/2021 16/12/2021 31/08/2025 25/03/2024 13 4,192 599.17 587.46 67 98
39 Burdwan Division PURBA BARDHAMAN Khandaghosh AUGMENTATION OF GROUND WATER BASED SAGRIA PWSS TO ACCOMMODATE FHTC IN KHANDOGHOSH BLOCK UNDER BURDWAN SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT ,SM/09492 Augmentation Burdwan Sadar Sub-Division Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE 19/11/2021 15/12/2021 31/12/2025 25/03/2024 8 3,020 586.55 575.81 95 98
40 Burdwan Division PURBA BARDHAMAN Raina-I Augmentation of ground water based RAINA PWSS to accommodate FHTC in Raina-I block under Burdwan Sub Division of Burdwan Division in Purba Bardhaman District ,SM/09493 Augmentation Burdwan Sadar Sub-Division ASSISTANT ENGINEER,Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER 19/11/2021 15/12/2021 31/08/2025 25/03/2024 12 2,087 371.84 353.99 80 95
41 Burdwan Division PURBA BARDHAMAN Burdwan-I AUGMENTATION OF GROUND WATER BASED TALIT-SIMDAL PWSS TO ACCOMMODATE FHTC IN BURDWAN -I BLOCK UNDER BURDWAN SUB-DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT,SM/09566 Augmentation Burdwan Sadar Sub-Division ASSISTANT ENGINEER,Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. Junior Engineer 22/11/2021 22/12/2021 31/12/2025 25/03/2024 7 3,670 623.11 542.19 57 87
42 Burdwan Division PURBA BARDHAMAN Katwa-I AUGMENTATION OF GROUND WATER BASED KAITHAN PWSS TO ACCOMMODATE FHTC IN KATWA-I BLOCK UNDER KATWA SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT ,SM/09568 Augmentation Central Mechanical Sub-Division Assistant Engineer Junior Engineer 22/11/2021 21/12/2021 31/07/2025 25/03/2024 10 2,804 455.89 437.08 98 96
43 Burdwan Division PURBA BARDHAMAN Mangolkote Augmentation of ground water based MAJHIGRAM SINGOT PWSS to accommodate FHTC in Mangolkote block under Katwa Sub Division of Burdwan Division in Purba Bardhaman District ,SM/09569 Augmentation Central Mechanical Sub-Division Assistant Engineer Junior Engineer 22/11/2021 22/12/2021 31/03/2025 25/03/2024 11 3,020 527.28 409.61 60 78
44 Burdwan Division PURBA BARDHAMAN Purbasthali-II Augmentation of Sajiara PWSS for providing FHTC under Baurdwan Division.,SM/09716 Augmentation Kalna Sub-division Assistant Engineer 26/11/2021 31/12/2021 31/03/2025 25/03/2024 20 2,772 652.10 163.06 98 25
45 Burdwan Division PURBA BARDHAMAN Purbasthali-II Augmentation of Patuli PWSS for providing FHTC under Burdwan Divison.,SM/09718 Augmentation Kalna Sub-division Assistant Engineer 26/11/2021 20/12/2021 31/07/2025 25/03/2024 17 3,845 802.22 652.13 80 81
46 Burdwan Division PURBA BARDHAMAN Kalna-I AUGMENTATION OF GROUND WATER BASED RADGANAGAR BAGHANAPARA PWSS TO ACCOMMODATE FHTC IN KALNA I BLOCK UNDER KALNA SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT,SM/09873 Augmentation Kalna Sub-division Assistant Engineer JUNIOR ENGINEER 06/12/2021 28/01/2022 31/03/2025 25/03/2024 10 3,189 651.80 257.23 39 39
47 Burdwan Division PURBA BARDHAMAN Kalna-II Augmentation of SATGACHI PWSS for providing Functional Household Tap Connection (FHTC) Block- Kalna-II Purba Burdwan West Bengal,SM/09921 Augmentation Kalna Sub-division Assistant Engineer JUNIOR ENGINEER 10/12/2021 01/02/2022 31/03/2025 25/03/2024 22 6,396 1,144.60 860.71 20 75
48 Burdwan Division PURBA BARDHAMAN Memari-I AUGMENTATION OF GROUND WATER BASED SASINARA ZONE I PWSS TO ACCOMMODATE FHTC IN MEMARI-I BLOCK UNDER BURDWAN SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT ,SM/10057 Augmentation Burdwan Sadar Sub-Division ASSISTANT ENGINEER,Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. Junior Engineer,JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE 25/01/2022 15/01/2022 31/03/2025 25/03/2024 19 3,593 972.04 611.12 60 63
49 Burdwan Division PURBA BARDHAMAN Manteswar DETAILED PROJECT REPORT FOR AUGMENTATION F GROUND WATER BASED KUSUMGRAM (ZONE I AND ZONE II) PWSS TO ACCOMMODATE FHTC IN MANTESWAR BLOCK UNDER KALNA SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT,SM/10058 Augmentation Kalna Sub-division Assistant Engineer JUNIOR ENGINEER 25/01/2022 15/01/2022 31/08/2025 25/03/2024 9 1,599 987.71 892.73 49 90
50 Burdwan Division PURBA BARDHAMAN Ketugram-I AUGMENTATION OF GROUND WATER BASED KETUGRAM (ZONE I & II) PWSS TO ACCOMMODATE FHTC IN KETUGRAM I & II BLOCK UNDER KATWA SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT,SM/10085 Augmentation Central Mechanical Sub-Division Assistant Engineer Junior Engineer 31/01/2022 21/02/2022 31/03/2025 25/03/2024 23 15,363 3,231.45 2,033.86 65 63
51 Burdwan Division PURBA BARDHAMAN Ketugram-II AUGMENTATION OF GROUND WATER BASED MOUGRAM (ZONE-I & II) PWSS TO ACCOMMODATE FHTC IN KETUGRAM-II BLOCK UNDER KATWA SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT ,SM/10123 Augmentation Central Mechanical Sub-Division Assistant Engineer Junior Engineer 08/02/2022 18/02/2022 31/03/2025 25/03/2024 11 4,801 1,083.30 558.19 65 52
52 Burdwan Division PURBA BARDHAMAN Raina-II Augmentation of ground water based KAITY PWSS to accommodate FHTC in Raina-II block under Burdwan Sub Division of Burdwan Division in Purba Bardhaman District ,SM/10130 Augmentation Burdwan Sadar Sub-Division ASSISTANT ENGINEER,Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER 08/02/2022 18/02/2021 31/08/2025 25/03/2024 21 5,728 1,023.72 916.73 69 90
53 Burdwan Division PURBA BARDHAMAN Kalna-I AUGMENTATION OF GROUND WATER BASED HATKALNA PWSS TO ACCOMMODATE FHTC IN KALNA I BLOCK UNDER KALNA SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT,SM/10337 Augmentation Kalna Sub-division Assistant Engineer JUNIOR ENGINEER 14/03/2022 15/01/2022 31/03/2025 25/03/2024 18 9,066 1,360.01 1,079.65 57 79
54 Burdwan Division PURBA BARDHAMAN Bhatar AUGMENTATION OF GROUND WATER BASED PIPED WATER SUPPLY SCHEME FOR BONPAS KAMARPARA TO ACCOMMODATE FHTC UNDER BHATAR BLOCK IN PURBA BARDHAMAN DISTRICT UNDER BURDWAN DIVISION PHE DTE,SM/10391 Augmentation Durgapur Sub-DIvision ASSISTANT ENGINEER,Assistant Engineer, Durgapur Sub Division, P.H.E. Dte 24/03/2022 03/01/2023 31/08/2025 25/03/2024 12 4,079 942.30 766.46 39 81
55 Burdwan Division PURBA BARDHAMAN Burdwan-II DETAILED PROJECT REPORT FOR AUGMENTATION OF BORSHUL (ZONE-II) PWSS BURDWAN-II PURBA BARDHAMAN,SM/10481 Augmentation Burdwan Sadar Sub-Division ASSISTANT ENGINEER,Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. 13/04/2022 05/12/2022 31/03/2025 25/03/2024 20 1,951 749.99 394.50 20 53
56 Burdwan Division PURBA BARDHAMAN Providing Water Supply Arrangement by Sinking of Tube Well at left out Primary Schools(290 nos) for 100% School Coverage in Purba Bardhaman within Kalna Sub Division under Burdwan Division P.H.E. DTE.,SM/11283 School Kalna Sub-division Assistant Engineer 28/06/2022 15/07/2022 31/07/2025 25/03/2024 8 0 548.04 433.07 20 79
57 Burdwan Division PURBA BARDHAMAN Jamalpur GROUND WATER BASED KALERA PIPED WATER SUPPLY SCHEME JAMALPUR BLOCK PURBA BARDHAMAN,SM/11491 New Central Mechanical Sub-Division AE(HQs), Burdwan Division, PHE Dte.,ASSISTANT ENGINEER JUNIOR ENGINEER 19/07/2022 09/07/2022 31/03/2025 25/03/2024 16 1,442 457.23 332.44 90 73
58 Burdwan Division PURBA BARDHAMAN Jamalpur GROUND WATER BASED SELIMABAD PIPED WATER SUPPLY SCHEME JAMALPUR BLOCK PURBA BARDHAMAN,SM/11492 New Central Mechanical Sub-Division AE(HQs), Burdwan Division, PHE Dte.,ASSISTANT ENGINEER JUNIOR ENGINEER 19/07/2022 12/01/2022 30/06/2025 25/03/2024 32 2,015 666.43 372.87 77 56
59 Burdwan Division PURBA BARDHAMAN Mangolkote PROVIDING FUNCTIONAL HOUSEHOLD TAP CONNECTION (FHTC) PHASE-II BY AREA OF KASIARA PIPED WATER SUPPLY SCHEME AT MONGALKOTE BLOCK UNDER BURDWAN DIVISION PHE DTE.,SM/12080 Retrofitting Katwa Sub-Division Assistant Engineer 02/09/2022 09/02/2022 31/08/2025 25/03/2024 7 414 26.74 17.18 80 64
60 Burdwan Division PURBA BARDHAMAN Burdwan-II Kusha Piped Water Supply Scheme,SM/13279 New Burdwan Sadar Sub-Division ASSISTANT ENGINEER,Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. Junior Engineer 17/10/2022 31/01/2023 31/03/2025 25/03/2024 12 1,059 548.58 340.22 71 62
61 Burdwan Division PURBA BARDHAMAN Manteswar GROUND WATER SUPPLY BASED PIPED WATER SUPPLY SCHEME FOR SUTRA PWSS IN MANTESHWAR BLOCK OF PURBA BURDWAN DISTRICT UNDER BURDWAN DIVISION, P.H.E. DTE.,SM/13280 New Kalna Sub-division Assistant Engineer JUNIOR ENGINEER,JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE 17/10/2022 14/03/2023 31/03/2025 25/03/2024 11 1,672 575.10 448.62 56 78
62 Burdwan Division PURBA BARDHAMAN Raina-II CHAK CHANDAN PIPED WATER SUPPLY SCHEME,SM/13281 New Burdwan Sadar Sub-Division ASSISTANT ENGINEER,Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER 17/10/2022 18/07/2023 31/03/2025 25/03/2024 12 1,136 510.50 256.62 52 50
63 Burdwan Division PURBA BARDHAMAN Manteswar GROUND WATER SUPPLY BASED PIPED WATER SUPPLY SCHEME FOR PARGUNA PWSS IN MANTESHWAR BLOCK OF PURBA BARDHAMAN UNDER BURDWAN DIVISION PHE DTE,SM/13282 New Kalna Sub-division Assistant Engineer JUNIOR ENGINEER 17/10/2022 08/02/2023 08/02/2025 25/03/2024 7 2,248 837.17 281.71 2 34
64 Burdwan Division PURBA BARDHAMAN Manteswar GROUND WATER SUPPLY BASED PIPED WATER SUPPLY SCHEME FOR PIPLON PWSS IN MANTESHWAR BLOCK OF PURBA BURDWAN DISTRICT UNDER BURDWAN DIVISION, P.H.E. DTE.,SM/13283 New Kalna Sub-division Assistant Engineer JUNIOR ENGINEER 17/10/2022 08/02/2023 08/02/2025 25/03/2024 8 2,296 922.78 251.89 2 27
65 Burdwan Division PURBA BARDHAMAN Manteswar GROUND WATER SUPPLY BASED PIPED WATER SUPPLY SCHEME FOR JAMNA PWSS IN MANTESHWAR BLOCK OF PURBA BARDHAMAN UNDER BURDWAN DIVISION PHE DTE,SM/13291 New Kalna Sub-division Assistant Engineer JUNIOR ENGINEER 17/10/2022 08/02/2023 08/02/2025 25/03/2024 16 2,810 871.79 210.70 2 24
66 Burdwan Division PURBA BARDHAMAN Burdwan-II HARIGRAM PIPED WATER SUPPLY SCHEME,SM/13292 New Burdwan Sadar Sub-Division ASSISTANT ENGINEER,Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. Junior Engineer 17/10/2022 02/08/2023 31/03/2025 25/03/2024 11 1,217 526.13 283.38 61 54
67 Burdwan Division PURBA BARDHAMAN Burdwan-II Baikunthapur Piped Water Supply Scheme,SM/13294 New Burdwan Sadar Sub-Division ASSISTANT ENGINEER,Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. Junior Engineer 17/10/2022 15/05/2023 30/09/2025 25/03/2024 13 1,926 881.80 256.84 33 29
68 Burdwan Division PURBA BARDHAMAN Burdwan-II Gangua Piped Water Supply Scheme,SM/13295 New Burdwan Sadar Sub-Division ASSISTANT ENGINEER,Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. Junior Engineer 17/10/2022 18/08/2023 31/03/2025 25/03/2024 9 1,665 574.91 194.16 27 34
69 Burdwan Division PURBA BARDHAMAN Burdwan-II Amra Piped Water Supply Scheme,SM/13296 New Durgapur Sub-DIvision ASSISTANT ENGINEER,Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer,Junior Engineer2, Durgapur Sub-Division, PHE Dte. 17/10/2022 15/05/2023 30/09/2025 25/03/2024 9 896 405.32 136.26 3 34
70 Burdwan Division PURBA BARDHAMAN Khandaghosh RUPSA PIPED WATER SUPPLY SCHEME,SM/13298 New Durgapur Sub-DIvision ASSISTANT ENGINEER,Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer,Junior Engineer2, Durgapur Sub-Division, PHE Dte. 17/10/2022 13/04/2023 31/07/2025 25/03/2024 11 2,439 947.38 276.84 34 29
71 Burdwan Division PURBA BARDHAMAN Purbasthali-I HARIPUR PIPED WATER SUPPLY SCHEME ,SM/13315 New Kalna Sub-division Assistant Engineer JUNIOR ENGINEER,JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE 17/10/2022 22/03/2023 30/06/2025 25/03/2024 11 543 342.07 224.14 71 66
72 Burdwan Division PURBA BARDHAMAN Purbasthali-I MASGARIA PIPED WATER SUPPLY SCHEME,SM/13318 New Kalna Sub-division Assistant Engineer JUNIOR ENGINEER 17/10/2022 17/04/2023 31/07/2025 25/03/2024 18 1,233 553.22 252.43 47 46
73 Burdwan Division PURBA BARDHAMAN Burdwan-II Samanti Piped Water Supply Scheme,SM/13319 New Burdwan Sadar Sub-Division ASSISTANT ENGINEER,Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. Junior Engineer 17/10/2022 29/03/2023 31/08/2025 25/03/2024 10 2,107 926.00 402.95 42 44
74 Burdwan Division PURBA BARDHAMAN Purbasthali-I MANGANPUR PIPED WATER SUPPLY SCHEME,SM/13327 New Kalna Sub-division Assistant Engineer JUNIOR ENGINEER 17/10/2022 24/07/2023 30/09/2025 25/03/2024 12 1,736 784.22 312.25 19 40
75 Burdwan Division PURBA BARDHAMAN Raina-II UCHALAN PIPED WATER SUPPLY SCHEME,SM/13329 New Burdwan Sadar Sub-Division ASSISTANT ENGINEER,Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER 17/10/2022 18/07/2023 31/03/2025 25/03/2024 11 1,924 733.45 275.53 41 38
76 Burdwan Division PURBA BARDHAMAN Manteswar Ground Water Supply Based Piped Water Supply Scheme For DHENUA PWSS in Manteshwar Block of Purab Burdwan District under Burdwan Division, PHE Dte.,SM/13331 New Durgapur Sub-DIvision ASSISTANT ENGINEER,Assistant Engineer, Durgapur Sub Division, P.H.E. Dte JUNIOR ENGINEER 17/10/2022 08/08/2023 31/12/2025 25/03/2024 11 2,827 942.52 215.98 2 23
77 Burdwan Division PURBA BARDHAMAN Raina-II Katnabil Piped Water Supply Scheme,SM/13338 New Burdwan Sadar Sub-Division ASSISTANT ENGINEER,Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER 17/10/2022 18/07/2023 31/03/2025 25/03/2024 12 1,319 623.44 250.46 56 40
78 Burdwan Division PURBA BARDHAMAN Manteswar GROUND WATER SUPPLY BASED PIPED WATER SUPPLY SCHEME FOR BELENDA PWSS IN MANTESHWAR BLOCK OF PURBA BARDHAMAN DISTRICT UNDER BURDWAN DIVISION PHE DTE,SM/13340 New Kalna Sub-division Assistant Engineer JUNIOR ENGINEER 17/10/2022 08/02/2023 08/02/2025 25/03/2024 16 1,861 691.97 224.17 2 32
79 Burdwan Division PURBA BARDHAMAN Raina-II Serpur Piped Water Supply Scheme,SM/13384 New Burdwan Sadar Sub-Division ASSISTANT ENGINEER,Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER 18/10/2022 18/07/2023 31/03/2025 25/03/2024 9 813 478.73 105.57 26 22
80 Burdwan Division PURBA BARDHAMAN Bhatar DEBPUR PIPED WATER SUPPLY SCHEME ,SM/13398 New Durgapur Sub-DIvision Assistant Engineer,Assistant Engineer, Durgapur Sub Division, P.H.E. Dte JUNIOR ENGINEER ,Junior Engineer2, Durgapur Sub-Division, PHE Dte. 18/10/2022 13/04/2023 31/08/2025 25/03/2024 11 1,898 792.97 420.41 37 53
81 Burdwan Division PURBA BARDHAMAN Purbasthali-I ARJUNPUKUR PIPED WATER SUPPLY SCHEME,SM/13413 New Kalna Sub-division Assistant Engineer JUNIOR ENGINEER,JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE 02/11/2022 04/05/2023 30/09/2025 25/03/2024 12 1,316 653.36 429.24 77 66
82 Burdwan Division PURBA BARDHAMAN Memari-I DURGADANGA PIPED WATER SUPPLY SINGLE VILLAGE SCHEME,SM/13417 New Burdwan Sadar Sub-Division ASSISTANT ENGINEER,Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. Junior Engineer,JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE 02/11/2022 04/12/2023 31/03/2025 25/03/2024 12 354 234.83 143.77 67 61
83 Burdwan Division PURBA BARDHAMAN Purbasthali-I KONRAPUR PIPED WATER SUPPLY SCHEME,SM/13419 New Kalna Sub-division Assistant Engineer JUNIOR ENGINEER 02/11/2022 17/04/2023 31/03/2025 25/03/2024 11 1,636 728.41 161.56 38 22
84 Burdwan Division PURBA BARDHAMAN Memari-II BARAPALASHAN PIPED WATER SUPPLY SCHEME,SM/13423 New Burdwan Sadar Sub-Division ASSISTANT ENGINEER,Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. Junior Engineer,JUNIOR ENGINEER RWS BURDWAN SUB-DIVISION PHE DTE 02/11/2022 19/05/2023 31/07/2025 25/03/2024 10 1,825 714.32 204.52 17 29
85 Burdwan Division PURBA BARDHAMAN Khandaghosh GUIR PIPED WATER SUPPLY SCHEME IN KHANDOGHOSH BLOCK,SM/13424 New Durgapur Sub-DIvision ASSISTANT ENGINEER,Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer,Junior Engineer2, Durgapur Sub-Division, PHE Dte. 02/11/2022 13/04/2023 31/03/2025 25/03/2024 12 2,435 997.78 517.79 71 52
86 Burdwan Division PURBA BARDHAMAN Memari-I SAHAPUR PIPED WATER SUPPLY SCHEME,SM/13425 New Burdwan Sadar Sub-Division ASSISTANT ENGINEER,Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. Junior Engineer,JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE 02/11/2022 01/09/2023 31/03/2025 25/03/2024 13 1,188 572.23 330.90 88 58
87 Burdwan Division PURBA BARDHAMAN Memari-I BIJRA PIPED WATER SUPPLY SCHEME,SM/13426 New Burdwan Sadar Sub-Division ASSISTANT ENGINEER,Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. Junior Engineer,JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE 02/11/2022 15/05/2023 31/07/2025 25/03/2024 10 1,934 838.13 203.65 42 24
88 Burdwan Division PURBA BARDHAMAN Khandaghosh PUNSHUR PIPED WATER SUPPLY SCHEME IN KHANDOGHOSH BLOCK,SM/13450 New Durgapur Sub-DIvision ASSISTANT ENGINEER,Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer,Junior Engineer2, Durgapur Sub-Division, PHE Dte. 02/11/2022 01/11/2023 31/03/2025 25/03/2024 13 800 450.26 199.65 61 44
89 Burdwan Division PURBA BARDHAMAN Purbasthali-I KAMALPUR PIPED WATER SUPPLY SCHEME,SM/13453 New Durgapur Sub-DIvision ASSISTANT ENGINEER,Assistant Engineer, Durgapur Sub Division, P.H.E. Dte JUNIOR ENGINEER,Junior Engineer2, Durgapur Sub-Division, PHE Dte. 02/11/2022 22/05/2023 31/03/2025 25/03/2024 7 695 335.66 115.30 3 34
90 Burdwan Division PURBA BARDHAMAN Khandaghosh AMRA PIPED WATER SUPPLY SCHEME ,SM/13454 New Burdwan Sadar Sub-Division ASSISTANT ENGINEER,Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. Junior Engineer 02/11/2022 13/04/2023 31/07/2025 25/03/2024 10 1,602 799.29 337.27 55 42
91 Burdwan Division PURBA BARDHAMAN Khandaghosh TELUN PIPED WATER SUPPLY SCHEME ,SM/13455 New Durgapur Sub-DIvision ASSISTANT ENGINEER,Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer,Junior Engineer2, Durgapur Sub-Division, PHE Dte. 02/11/2022 29/03/2023 30/09/2025 25/03/2024 11 2,128 908.70 129.14 11 14
92 Burdwan Division PURBA BARDHAMAN Khandaghosh BALABATI PIPED WATER SUPPLY SCHEME,SM/13457 New Durgapur Sub-DIvision ASSISTANT ENGINEER,Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer,Junior Engineer2, Durgapur Sub-Division, PHE Dte. 02/11/2022 13/04/2023 31/07/2025 25/03/2024 9 1,364 678.20 264.32 55 39
93 Burdwan Division PURBA BARDHAMAN Memari-II KUCHUT PIPED WATER SUPPLY SCHEME,SM/13464 New Burdwan Sadar Sub-Division ASSISTANT ENGINEER,Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. Junior Engineer,JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE 02/11/2022 14/03/2023 31/08/2025 25/03/2024 21 2,306 910.64 429.53 88 47
94 Burdwan Division PURBA BARDHAMAN Khandaghosh KHUNDKURI PIPED WATER SUPPLY SCHEME,SM/13465 New Burdwan Sadar Sub-Division ASSISTANT ENGINEER,Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. Junior Engineer,JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE 02/11/2022 16/03/2023 31/03/2025 25/03/2024 14 2,692 992.74 506.87 74 51
95 Burdwan Division PURBA BARDHAMAN Memari-I MAGRA PIPED WATER SUPPLY SCHEME IN MEMARI-1 BLOCK,SM/13491 New Burdwan Sadar Sub-Division ASSISTANT ENGINEER,Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. Junior Engineer,JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE 02/11/2022 31/01/2023 31/03/2025 25/03/2024 22 2,003 789.53 430.94 50 55
96 Burdwan Division PURBA BARDHAMAN Manteswar SIGHNALI PIPED WATER SUPPLY SCHEME.,SM/13496 New Durgapur Sub-DIvision ASSISTANT ENGINEER,Assistant Engineer, Durgapur Sub Division, P.H.E. Dte JUNIOR ENGINEER 02/11/2022 08/09/2023 31/03/2025 25/03/2024 7 2,101 771.80 416.69 2 54
97 Burdwan Division PURBA BARDHAMAN Purbasthali-I KACHUA PIPED WATER SUPPLY SCHEME,SM/13497 New Kalna Sub-division Assistant Engineer JUNIOR ENGINEER,JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE 02/11/2022 22/05/2023 31/07/2025 25/03/2024 10 1,137 520.29 309.60 11 60
98 Burdwan Division PURBA BARDHAMAN Purbasthali-I KARAIL PIPED WATER SUPPLY SCHEME,SM/13498 New Durgapur Sub-DIvision ASSISTANT ENGINEER,Assistant Engineer, Durgapur Sub Division, P.H.E. Dte JUNIOR ENGINEER 02/11/2022 08/02/2023 08/02/2025 25/03/2024 6 298 194.91 34.88 9 18
99 Burdwan Division PURBA BARDHAMAN Khandaghosh UKHRID PIPED WATER SUPPLY SCHEME,SM/13505 New Durgapur Sub-DIvision ASSISTANT ENGINEER,Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer,Junior Engineer2, Durgapur Sub-Division, PHE Dte. 02/11/2022 13/04/2023 31/07/2025 25/03/2024 8 2,045 834.72 353.09 42 42
100 Burdwan Division PURBA BARDHAMAN Memari-I DEHA PIPED WATER SUPPLY SCHEME,SM/13506 New Burdwan Sadar Sub-Division ASSISTANT ENGINEER,Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. Junior Engineer,JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE 02/11/2022 15/05/2023 31/07/2025 25/03/2024 12 1,516 753.28 251.47 38 33
101 Burdwan Division PURBA BARDHAMAN Bhatar KHURUL PIPED WATER SUPPLY SCHEME,SM/13549 New Durgapur Sub-DIvision ASSISTANT ENGINEER,Assistant Engineer, Durgapur Sub Division, P.H.E. Dte JUNIOR ENGINEER 04/11/2022 08/02/2023 08/02/2025 25/03/2024 8 738 357.08 156.08 4 44
102 Burdwan Division PURBA BARDHAMAN Bhatar BALSIDANGA PIPED WATER SUPPLY SCHEME,SM/13904 New Durgapur Sub-DIvision ASSISTANT ENGINEER,Assistant Engineer, Durgapur Sub Division, P.H.E. Dte JUNIOR ENGINEER 29/11/2022 24/03/2023 31/03/2025 25/03/2024 13 319 245.44 124.07 57 51
103 Burdwan Division PURBA BARDHAMAN Burdwan-I BARASAT PIPED WATER SUPPLY SCHEME,SM/13906 New Burdwan Sadar Sub-Division ASSISTANT ENGINEER,Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. Junior Engineer 29/11/2022 08/08/2023 31/03/2025 25/03/2024 9 2,198 813.48 202.28 30 25
104 Burdwan Division PURBA BARDHAMAN Memari-I CHOTKHANDA PIPED WATER SUPPLY SCHEME,SM/13907 New Burdwan Sadar Sub-Division ASSISTANT ENGINEER,Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. Junior Engineer,JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE 29/11/2022 19/05/2023 30/06/2025 25/03/2024 11 2,846 995.08 419.10 52 42
105 Burdwan Division PURBA BARDHAMAN Khandaghosh CHAGRAM PIPED WATER SUPPLY SCHEME,SM/13941 New Durgapur Sub-DIvision ASSISTANT ENGINEER,Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer,Junior Engineer2, Durgapur Sub-Division, PHE Dte. 01/12/2022 05/04/2023 31/07/2025 25/03/2024 9 1,984 846.16 414.36 51 49
106 Burdwan Division PURBA BARDHAMAN Khandaghosh KAMALPUR PIPED WATER SUPPLY SCHEME,SM/13942 New Durgapur Sub-DIvision ASSISTANT ENGINEER,Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer,Junior Engineer2, Durgapur Sub-Division, PHE Dte. 01/12/2022 05/04/2023 30/09/2025 25/03/2024 11 2,652 869.97 450.02 42 52
107 Burdwan Division PURBA BARDHAMAN Burdwan-I KURMUN PIPED WATER SUPPLY SCHEME,SM/13943 New Burdwan Sadar Sub-Division ASSISTANT ENGINEER,Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. Junior Engineer 01/12/2022 08/02/2023 08/02/2025 25/03/2024 12 2,937 978.48 186.61 2 19
108 Burdwan Division PURBA BARDHAMAN Burdwan-I BAKALSA PIPED WATER SUPPLY SCHEME,SM/13944 New Burdwan Sadar Sub-Division ASSISTANT ENGINEER,Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. Junior Engineer 01/12/2022 25/08/2023 31/03/2025 25/03/2024 10 2,409 916.69 200.89 5 22
109 Burdwan Division PURBA BARDHAMAN Burdwan-I JAGADABAD PIPED WATER SUPPLY SCHEME,SM/13945 New Burdwan Sadar Sub-Division ASSISTANT ENGINEER,Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. Junior Engineer 01/12/2022 08/08/2023 31/03/2025 25/03/2024 8 2,060 872.95 257.05 24 29
110 Burdwan Division PURBA BARDHAMAN Burdwan-I KHAIDYA PIPED WATER SUPPLY SCHEME,SM/13946 New Burdwan Sadar Sub-Division ASSISTANT ENGINEER,Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. Junior Engineer 01/12/2022 08/08/2023 31/03/2025 25/03/2024 9 2,342 976.89 204.22 36 21
111 Burdwan Division PURBA BARDHAMAN Memari-II GHOSHPUR PIPED WATER SUPPLY SCHEME,SM/13947 New Burdwan Sadar Sub-Division ASSISTANT ENGINEER,Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. Junior Engineer,JUNIOR ENGINEER RWS BURDWAN SUB-DIVISION PHE DTE 01/12/2022 19/05/2023 31/08/2025 25/03/2024 11 1,952 851.51 189.05 24 22
112 Burdwan Division PURBA BARDHAMAN Ausgram-II AMARPUR PIPED WATER SUPPLY SCHEME,SM/13967 New Durgapur Sub-DIvision ASSISTANT ENGINEER,Assistant Engineer, Durgapur Sub Division, P.H.E. Dte JUNIOR ENGINEER 01/12/2022 08/02/2023 08/02/2025 25/03/2024 12 1,194 613.42 236.29 3 39
113 Burdwan Division PURBA BARDHAMAN Purbasthali-I AUGMENTATION OF GROUND WATER BASED WATER SUPPLY SCHEME FOR NASRATPUR PWSS (PART-B) UNDER BURDWAN DIVISION BLOCK PURBASTHALI I DISTRICT PURBA BARDDHAMAN,SM/14014 Augmentation Kalna Sub-division Assistant Engineer JUNIOR ENGINEER 05/12/2022 14/11/2022 31/03/2025 25/03/2024 11 13,054 848.66 461.29 24 54
114 Burdwan Division PURBA BARDHAMAN Bhatar CHHATINI PIPED WATER SUPPLY SCHEME,SM/14017 New Durgapur Sub-DIvision ASSISTANT ENGINEER,Assistant Engineer, Durgapur Sub Division, P.H.E. Dte JUNIOR ENGINEER,Junior Engineer2, Durgapur Sub-Division, PHE Dte. 05/12/2022 15/05/2023 31/07/2025 25/03/2024 13 2,137 959.51 236.57 33 25
115 Burdwan Division PURBA BARDHAMAN Purbasthali-I MOUDANGA PIPED WATER SUPPLY SCHEME ,SM/14020 New Central Mechanical Sub-Division ASSISTANT ENGINEER JUNIOR ENGINEER 05/12/2022 23/08/2023 31/03/2026 25/03/2024 10 1,630 786.60 116.16 5 15
116 Burdwan Division PURBA BARDHAMAN Purbasthali-I RAJAPUR PIPED WATER SUPPLY SCHEME,SM/14021 New Central Mechanical Sub-Division ASSISTANT ENGINEER JUNIOR ENGINEER 05/12/2022 30/01/2023 30/06/2025 25/03/2024 12 576 270.24 208.27 84 77
117 Burdwan Division PURBA BARDHAMAN Bhatar MANDARDIHI PIPED WATER SUPPLY SCHEME,SM/14052 New Durgapur Sub-DIvision ASSISTANT ENGINEER,Assistant Engineer, Durgapur Sub Division, P.H.E. Dte JUNIOR ENGINEER 12/12/2022 03/02/2023 30/04/2025 25/03/2024 12 317 251.90 116.09 75 46
118 Burdwan Division PURBA BARDHAMAN Katwa-II KALIKAPUR PIPED WATER SUPPLY SCHEME,SM/14053 New Central Mechanical Sub-Division Assistant Engineer Junior Engineer 12/12/2022 03/09/2023 31/03/2025 25/03/2024 11 2,794 989.35 415.84 39 42
119 Burdwan Division PURBA BARDHAMAN Katwa-II JAGADANANDAPUR PIPED WATER SUPPLY SCHEME,SM/14054 New Central Mechanical Sub-Division Assistant Engineer Junior Engineer 12/12/2022 24/02/2023 30/06/2025 25/03/2024 11 2,763 991.42 544.48 66 55
120 Burdwan Division PURBA BARDHAMAN Katwa-II SRIBATI PIPED WATER SUPPLY SCHEME,SM/14055 New Central Mechanical Sub-Division Assistant Engineer Junior Engineer 12/12/2022 24/02/2023 31/03/2025 25/03/2024 10 2,799 998.02 595.26 70 60
121 Burdwan Division PURBA BARDHAMAN Katwa-II AKHRA PIPED WATER SUPPLY SCHEME,SM/14057 New Central Mechanical Sub-Division Assistant Engineer Junior Engineer 12/12/2022 13/04/2023 30/06/2025 25/03/2024 12 1,984 804.45 478.42 39 59
122 Burdwan Division PURBA BARDHAMAN Bhatar NABASTA PIPED WATER SUPPLY SCHEME,SM/14059 New Durgapur Sub-DIvision ASSISTANT ENGINEER,Assistant Engineer, Durgapur Sub Division, P.H.E. Dte JUNIOR ENGINEER 12/12/2022 08/02/2023 08/02/2025 25/03/2024 10 1,515 843.93 228.83 5 27
123 Burdwan Division PURBA BARDHAMAN Bhatar POALKURA PIPED WATER SUPPLY SCHEME,SM/14061 New Durgapur Sub-DIvision ASSISTANT ENGINEER,Assistant Engineer, Durgapur Sub Division, P.H.E. Dte JUNIOR ENGINEER,Junior Engineer2, Durgapur Sub-Division, PHE Dte. 12/12/2022 08/02/2023 08/02/2025 25/03/2024 10 780 384.32 128.34 5 33
124 Burdwan Division PURBA BARDHAMAN Mangolkote KOTALGHOSH PIPED WATER SUPPLY SCHEME,SM/14062 New Central Mechanical Sub-Division Assistant Engineer Junior Engineer 12/12/2022 08/10/2023 31/12/2025 25/03/2024 12 1,423 659.18 318.06 11 48
125 Burdwan Division PURBA BARDHAMAN Kalna-I UTRA PIPED WATER SUPPLY SCHEME,SM/14077 New Kalna Sub-division Assistant Engineer JUNIOR ENGINEER 12/12/2022 04/12/2023 31/03/2025 25/03/2024 13 2,024 752.00 561.00 76 75
126 Burdwan Division PURBA BARDHAMAN Khandaghosh SARANGA PIPED WATER SUPPLY SCHEME,SM/14078 New Burdwan Sadar Sub-Division ASSISTANT ENGINEER,Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. Junior Engineer 12/12/2022 05/04/2023 31/03/2025 25/03/2024 15 1,147 552.88 302.35 57 55
127 Burdwan Division PURBA BARDHAMAN Katwa-II BARA KULGACHHI PIPED WATER SUPPLY SCHEME,SM/14079 New Central Mechanical Sub-Division Assistant Engineer Junior Engineer 12/12/2022 24/02/2023 31/03/2025 25/03/2024 12 2,461 951.80 539.40 30 57
128 Burdwan Division PURBA BARDHAMAN Ausgram-I GROUND WATER BASED MINI PIPED WATER SUPPLY SCHEMES AT UNCOVERED VILLAGES IN ALL BLOCKS WITHIN PURBA BARDHAMAN DISTRICT UNDER BURDWAN DIVISION PHE DTE,SM/14132 New Burdwan Sadar Sub-Division Assistant Engineer,Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE.,Assistant Engineer, Durgapur Sub Division, P.H.E. Dte 02/01/2023 03/01/2023 30/04/2025 25/03/2024 6 11,115 5,905.97 1,253.86 9 21
129 Burdwan Division PURBA BARDHAMAN Manteswar Ground Water Supply Based Piped Water Supply Scheme For KHULE PWSS in Manteshwar Block of Purab Burdwan District under Burdwan Division, PHE Dte,SM/14425 New Kalna Sub-division Assistant Engineer JUNIOR ENGINEER,JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE 20/01/2023 04/05/2023 31/07/2025 25/03/2024 11 2,717 926.18 480.04 19 52
130 Burdwan Division PURBA BARDHAMAN Kalna-I DEARA PIPED WATER SUPPLY SCHEME,SM/14435 New Kalna Sub-division Assistant Engineer JUNIOR ENGINEER 20/01/2023 03/06/2023 30/06/2025 25/03/2024 18 1,692 695.72 344.11 23 49
131 Burdwan Division PURBA BARDHAMAN Kalna-I NIRALGACHHI PIPED WATER SUPPLY SCHEME,SM/14436 New Kalna Sub-division Assistant Engineer JUNIOR ENGINEER 20/01/2023 19/04/2023 30/09/2025 25/03/2024 8 2,227 835.48 102.82 3 12
132 Burdwan Division PURBA BARDHAMAN Kalna-I SHIKARPUR PIPED WATER SUPPLY SCHEME,SM/14437 New Kalna Sub-division Assistant Engineer JUNIOR ENGINEER 20/01/2023 03/06/2023 31/03/2025 25/03/2024 12 2,462 947.99 347.43 13 37
133 Burdwan Division PURBA BARDHAMAN Manteswar SHUSHNA PIPED WATER SUPPLY SCHEME,SM/14438 New Durgapur Sub-DIvision ASSISTANT ENGINEER,Assistant Engineer, Durgapur Sub Division, P.H.E. Dte JUNIOR ENGINEER 20/01/2023 08/09/2023 31/03/2025 25/03/2024 12 2,000 824.06 375.91 2 46
134 Burdwan Division PURBA BARDHAMAN Kalna-I PATHARDANGA PIPED WATER SUPPLY SCHEME,SM/14440 New Kalna Sub-division Assistant Engineer JUNIOR ENGINEER 20/01/2023 03/06/2023 30/06/2025 25/03/2024 17 2,852 997.37 561.25 47 56
135 Burdwan Division PURBA BARDHAMAN Kalna-I TAIPARA Piped Water Supply Scheme.,SM/14442 New Kalna Sub-division Assistant Engineer JUNIOR ENGINEER 20/01/2023 19/04/2023 31/12/2025 25/03/2024 16 2,406 906.99 447.53 21 49
136 Burdwan Division PURBA BARDHAMAN Bhatar NASIGRAM PIPED WATER SUPPLY SCHEME,SM/14443 New Durgapur Sub-DIvision ASSISTANT ENGINEER,Assistant Engineer, Durgapur Sub Division, P.H.E. Dte JUNIOR ENGINEER,Junior Engineer2, Durgapur Sub-Division, PHE Dte. 20/01/2023 19/04/2023 31/12/2025 25/03/2024 13 2,924 993.43 632.75 75 64
137 Burdwan Division PURBA BARDHAMAN Manteswar IBRAMBAD PIPED WATER SUPPLY SCHEME,SM/14444 New Durgapur Sub-DIvision ASSISTANT ENGINEER,Assistant Engineer, Durgapur Sub Division, P.H.E. Dte JUNIOR ENGINEER 20/01/2023 08/08/2023 31/03/2025 25/03/2024 9 2,085 801.33 358.93 2 45
138 Burdwan Division PURBA BARDHAMAN Mangolkote GOBARDHANPUR PIPED WATER SUPPLY SCHEME,SM/14445 New Central Mechanical Sub-Division Assistant Engineer Junior Engineer 20/01/2023 08/09/2023 31/03/2026 25/03/2024 10 1,445 725.97 42.36 2 6
139 Burdwan Division PURBA BARDHAMAN Ketugram-II GURPARA PIPED WATER SUPPLY SCHEME,SM/14447 New Central Mechanical Sub-Division Assistant Engineer Junior Engineer 20/01/2023 18/04/2023 30/06/2025 25/03/2024 10 1,680 773.39 303.41 14 39
140 Burdwan Division PURBA BARDHAMAN Mangolkote PURBA GOPALPUR PIPED WATER SUPPLY SCHEME,SM/14448 New Central Mechanical Sub-Division Assistant Engineer Junior Engineer 20/01/2023 13/04/2023 31/08/2025 25/03/2024 9 2,411 894.65 207.59 19 23
141 Burdwan Division PURBA BARDHAMAN Memari-I TATARPUR PIPED WATER SUPPLY SCHEME,SM/14740 New Burdwan Sadar Sub-Division ASSISTANT ENGINEER,Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. Junior Engineer,JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE 31/01/2023 06/06/2023 31/03/2025 25/03/2024 9 1,639 702.48 216.85 40 31
142 Burdwan Division PURBA BARDHAMAN Burdwan-I HALDI PIPED WATER SUPPLY SINGLE VILLAGE SCHEME,SM/14906 New Burdwan Sadar Sub-Division ASSISTANT ENGINEER,Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. Junior Engineer 04/02/2023 08/02/2023 08/02/2025 25/03/2024 12 673 309.75 109.36 3 35
143 Burdwan Division PURBA BARDHAMAN Bhatar RAMCHANDRAPUR PIPED WATER SUPPLY SCHEME,SM/14909 New Durgapur Sub-DIvision ASSISTANT ENGINEER,Assistant Engineer, Durgapur Sub Division, P.H.E. Dte JUNIOR ENGINEER 04/02/2023 25/08/2023 31/12/2025 25/03/2024 12 1,666 849.53 64.77 4 8
144 Burdwan Division PURBA BARDHAMAN Mangolkote GOHAGRAM PIPED WATER SUPPLY SCHEME,SM/14910 New Central Mechanical Sub-Division Assistant Engineer Junior Engineer 04/02/2023 17/02/2023 31/07/2025 25/03/2024 11 1,208 641.25 238.53 58 37
145 Burdwan Division PURBA BARDHAMAN Mangolkote NIGAN PIPE WATER SUPPLY SCHEME,SM/14912 New Central Mechanical Sub-Division Assistant Engineer Junior Engineer 04/02/2023 23/05/2023 31/08/2025 25/03/2024 9 1,886 722.46 71.35 2 10
146 Burdwan Division PURBA BARDHAMAN Mangolkote KUNDA PIPED WATER SUPPLY SCHEME,SM/14913 New Central Mechanical Sub-Division Assistant Engineer Junior Engineer 04/02/2023 22/03/2023 31/03/2025 25/03/2024 9 481 385.14 117.13 65 30
147 Burdwan Division PURBA BARDHAMAN Ketugram-I SHRIGRAM PIPED WATER SUPPLY SCHEME,SM/14915 New Central Mechanical Sub-Division Assistant Engineer Junior Engineer 03/02/2023 23/05/2023 31/07/2025 25/03/2024 10 1,380 602.71 192.82 3 32
148 Burdwan Division PURBA BARDHAMAN Purbasthali-I NAMA BHANDARITURI PIPED WATER SUPPLY SCHEME,SM/14917 New Kalna Sub-division Assistant Engineer JUNIOR ENGINEER 04/02/2023 23/08/2023 31/12/2025 25/03/2024 8 392 232.57 89.30 5 38
149 Burdwan Division PURBA BARDHAMAN Mangolkote LAKHURIA PIPE WATER SUPPLY SCHEME,SM/14918 New Central Mechanical Sub-Division Assistant Engineer Junior Engineer 03/02/2023 18/08/2023 31/03/2025 25/03/2024 15 1,344 601.59 132.72 3 22
150 Burdwan Division PURBA BARDHAMAN Memari-II BAMUNPUKUR PIPED WATER SUPPLY SCHEME,SM/14930 New RWS Burdwan Sub-Division ASSISTANT ENGINEER,Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. Junior Engineer,JUNIOR ENGINEER RWS BURDWAN SUB-DIVISION PHE DTE 04/02/2023 19/05/2023 31/07/2025 25/03/2024 13 2,163 854.64 221.17 14 26
151 Burdwan Division PURBA BARDHAMAN Khandaghosh KHEJURHATI PIPED WATER SUPPLY SCHEME,SM/14952 New Durgapur Sub-DIvision ASSISTANT ENGINEER,Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer,Junior Engineer2, Durgapur Sub-Division, PHE Dte. 04/02/2023 05/04/2023 31/03/2025 25/03/2024 10 687 408.16 257.28 67 63
152 Burdwan Division PURBA BARDHAMAN Raina-I UDGARA PIPED WATER SUPPLY SCHEME,SM/14961 New Burdwan Sadar Sub-Division ASSISTANT ENGINEER,Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER 04/02/2023 08/02/2023 08/02/2025 25/03/2024 11 1,273 609.95 103.57 2 17
153 Burdwan Division PURBA BARDHAMAN Khandaghosh AMILIA PIPED WATER SUPPLY SCHEME,SM/14963 New Durgapur Sub-DIvision ASSISTANT ENGINEER,Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer,Junior Engineer2, Durgapur Sub-Division, PHE Dte. 04/02/2023 13/03/2023 31/12/2025 25/03/2024 11 894 415.83 281.95 78 68
154 Burdwan Division PURBA BARDHAMAN Mangolkote PASCHIM NABAGRAM PIPED WATER SUPPLY SCHEME,SM/14964 New Central Mechanical Sub-Division Assistant Engineer Junior Engineer 04/02/2023 18/07/2023 31/03/2025 25/03/2024 10 2,340 835.12 373.67 8 45
155 Burdwan Division PURBA BARDHAMAN Burdwan-II BAMCHANDRAPUR PIPED WATER SUPPLY SCHEME,SM/14965 New Burdwan Sadar Sub-Division ASSISTANT ENGINEER,Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. Junior Engineer 04/02/2023 06/08/2023 31/03/2025 25/03/2024 8 749 446.69 81.66 10 18
156 Burdwan Division PURBA BARDHAMAN Ketugram-II CHARKHI PIPED WATER SUPPLY SCHEME,SM/14966 New Central Mechanical Sub-Division Assistant Engineer Junior Engineer 04/02/2023 18/04/2023 31/07/2025 25/03/2024 10 1,582 721.47 271.39 5 38
157 Burdwan Division PURBA BARDHAMAN Raina-I MACHKHARA PIPED WATER SUPPLY SCHEME,SM/14967 New Burdwan Sadar Sub-Division ASSISTANT ENGINEER,Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER 04/02/2023 08/02/2023 08/02/2025 25/03/2024 9 1,886 878.93 161.43 10 18
158 Burdwan Division PURBA BARDHAMAN Purbasthali-I SAHAPUR PIPED WATER SUPPLY SCHEME ,SM/14969 New Kalna Sub-division Assistant Engineer JUNIOR ENGINEER 04/02/2023 23/08/2023 31/05/2026 25/03/2024 9 885 475.62 219.45 69 46
159 Burdwan Division PURBA BARDHAMAN Mangolkote MAHARUTBA PIPED WATER SUPPLY SCHEME,SM/14970 New Central Mechanical Sub-Division Assistant Engineer Junior Engineer 04/02/2023 08/02/2023 31/03/2025 25/03/2024 13 1,569 637.16 320.65 3 50
160 Burdwan Division PURBA BARDHAMAN Ketugram-II SHIBLUN PIPE WATER SUPPLY SCHEME,SM/14972 New Central Mechanical Sub-Division Assistant Engineer Junior Engineer 04/02/2023 18/04/2023 31/07/2025 25/03/2024 12 1,394 663.56 302.20 10 46
161 Burdwan Division PURBA BARDHAMAN Mangolkote DEULIA PIPED WATER SUPPLY SCHEME ,SM/14973 New Central Mechanical Sub-Division Assistant Engineer Junior Engineer 04/02/2023 08/09/2023 31/12/2025 25/03/2024 11 1,505 830.84 100.14 19 12
162 Burdwan Division PURBA BARDHAMAN Mangolkote BHATPARA PIPE WATER SUPPLY SCHEME,SM/14975 New Central Mechanical Sub-Division Assistant Engineer Junior Engineer 04/02/2023 08/02/2023 31/03/2025 25/03/2024 10 2,183 820.95 415.54 3 51
163 Burdwan Division PURBA BARDHAMAN Burdwan-I BAHIR SARBAMANGALA-A PIPE WATER SUPPLY SCHEME,SM/14976 New Burdwan Sadar Sub-Division ASSISTANT ENGINEER,Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. Junior Engineer 04/02/2023 19/05/2023 30/09/2025 25/03/2024 9 1,921 685.17 23.87 14 3
164 Burdwan Division PURBA BARDHAMAN Raina-I BHAGABATIPUR PIPED WATER SUPPLY SCHEME,SM/14977 New Burdwan Sadar Sub-Division ASSISTANT ENGINEER,Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER 04/02/2023 08/02/2023 08/02/2025 25/03/2024 11 1,708 841.52 267.82 2 32
165 Burdwan Division PURBA BARDHAMAN Raina-I CHAKPUROHIT PIPED WATER SUPPLY SCHEME,SM/14978 New Burdwan Sadar Sub-Division ASSISTANT ENGINEER,Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER 04/02/2023 06/08/2023 31/03/2025 25/03/2024 10 786 462.50 268.79 51 58
166 Burdwan Division PURBA BARDHAMAN Burdwan-I BAHIR SARBAMANGALA-B PIPED WATER SUPPLY SCHEME,SM/14979 New Burdwan Sadar Sub-Division ASSISTANT ENGINEER,Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. Junior Engineer 04/02/2023 19/05/2023 31/12/2025 25/03/2024 5 1,921 576.58 32.76 2 6
167 Burdwan Division PURBA BARDHAMAN Mangolkote JABAGRAM PIPED WATER SUPPLY SCHEME,SM/14980 New Central Mechanical Sub-Division Assistant Engineer Junior Engineer 04/02/2023 17/02/2023 31/07/2025 25/03/2024 11 2,196 879.79 448.26 61 51
168 Burdwan Division PURBA BARDHAMAN Mangolkote UNIATATARPUR PIPED WATER SUPPLY SCHEME,SM/15133 New Central Mechanical Sub-Division Assistant Engineer Junior Engineer 06/02/2023 08/09/2023 31/12/2025 25/03/2024 10 2,232 698.43 198.38 3 28
169 Burdwan Division PURBA BARDHAMAN Ketugram-I MALGRAM PIPED WATER SUPPLY SCHEME,SM/15150 New Central Mechanical Sub-Division Assistant Engineer Junior Engineer 08/02/2023 08/03/2023 31/03/2026 25/03/2024 10 2,056 636.08 269.43 3 42
170 Burdwan Division PURBA BARDHAMAN Katwa-I JAJIGRAM PIPE WATER SUPPLY SCHEME,SM/15151 New Central Mechanical Sub-Division Assistant Engineer Junior Engineer 08/02/2023 13/03/2023 31/03/2025 25/03/2024 12 1,588 709.72 370.27 28 52
171 Burdwan Division PURBA BARDHAMAN Ketugram-I ANKHONA PIPED WATER SUPPLY SCHEME,SM/15157 New Central Mechanical Sub-Division Assistant Engineer Junior Engineer 08/02/2023 08/03/2023 31/03/2026 25/03/2024 11 2,087 782.97 299.02 3 38
172 Burdwan Division PURBA BARDHAMAN Ketugram-I SRIPUR PIPE WATER SUPPLY SCHEME,SM/15158 New Central Mechanical Sub-Division Assistant Engineer Junior Engineer 08/02/2023 08/03/2023 31/12/2025 25/03/2024 11 1,608 571.60 183.25 5 32
173 Burdwan Division PURBA BARDHAMAN Ketugram-II AUGMENTATION OF GANGAGTIKURI PIPED WATER SUPPLY SCHEME,SM/15159 Augmentation Central Mechanical Sub-Division Assistant Engineer Junior Engineer 07/02/2023 13/04/2023 31/03/2025 25/03/2024 7 250 287.57 100.84 5 35
174 Burdwan Division PURBA BARDHAMAN Mangolkote SITAHATI PIPE WATER SUPPLY SCHEME,SM/15161 New Central Mechanical Sub-Division Assistant Engineer Junior Engineer 08/02/2023 08/02/2023 08/02/2025 25/03/2024 11 3,022 784.13 307.91 3 39
175 Burdwan Division PURBA BARDHAMAN Mangolkote CHAKULIA PIPE WATER SUPPLY SCHEME,SM/15162 New Central Mechanical Sub-Division Assistant Engineer Junior Engineer 08/02/2023 08/08/2023 31/12/2025 25/03/2024 13 2,774 700.93 134.20 3 19
176 Burdwan Division PURBA BARDHAMAN Ketugram-I MORGRAM PIPED WATER SUPPLY SCHEME,SM/15163 New Central Mechanical Sub-Division Assistant Engineer Junior Engineer 08/02/2023 08/03/2023 30/09/2025 25/03/2024 14 1,789 793.50 341.26 2 43
177 Burdwan Division PURBA BARDHAMAN Ketugram-II CHAR SUJAPUR PIPED WATER SUPPLY SCHEME,SM/15165 New Central Mechanical Sub-Division Assistant Engineer Junior Engineer 08/02/2023 14/07/2023 31/03/2025 25/03/2024 12 2,568 810.54 443.40 2 55
178 Burdwan Division PURBA BARDHAMAN Ketugram-I KULUTIA PIPED WATER SUPPLY SCHEME,SM/15167 New Central Mechanical Sub-Division Assistant Engineer Junior Engineer 08/02/2023 21/08/2023 31/12/2025 25/03/2024 11 1,631 685.87 176.15 2 26
179 Burdwan Division PURBA BARDHAMAN Ketugram-I CHATKA PIPED WATER SUPPLY SCHEME,SM/15168 New Central Mechanical Sub-Division Assistant Engineer Junior Engineer 08/02/2023 17/07/2023 31/03/2025 25/03/2024 12 2,317 771.03 442.05 19 57
180 Burdwan Division PURBA BARDHAMAN Ketugram-I CHINISPUR PIPED WATER SUPPLY SCHEME,SM/15170 New Central Mechanical Sub-Division Assistant Engineer Junior Engineer 08/02/2023 21/08/2023 31/03/2026 25/03/2024 11 1,794 584.60 148.49 3 25
181 Burdwan Division PURBA BARDHAMAN Katwa-I GOPKHANJI PIPED WATER SUPPLY SCHEME ,SM/15171 New Central Mechanical Sub-Division Assistant Engineer Junior Engineer 08/02/2023 13/03/2023 07/01/2025 25/03/2024 11 2,054 914.10 304.45 5 33
182 Burdwan Division PURBA BARDHAMAN Purbasthali-II JOYKRISHNAPUR PIPED WATER SUPPLY SCHEME,SM/15172 New Kalna Sub-division Assistant Engineer JUNIOR ENGINEER 08/02/2023 08/10/2023 31/03/2025 25/03/2024 16 1,745 739.90 216.15 10 29
183 Burdwan Division PURBA BARDHAMAN Memari-II AUGMENTATION OF SATGACHIA PWSS (ZONE-I)(PART-B),SM/15178 Augmentation Burdwan Sadar Sub-Division ASSISTANT ENGINEER,Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. Junior Engineer,JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE 07/02/2023 08/02/2023 08/02/2025 25/03/2024 9 0 273.13 18.25 77 7
184 Burdwan Division PURBA BARDHAMAN Memari-I AUGUMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR ALIPUR,SM/15191 Augmentation Burdwan Sadar Sub-Division ASSISTANT ENGINEER,Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. Junior Engineer,JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE 08/02/2023 31/05/2023 31/03/2025 25/03/2024 12 0 226.20 82.33 3 36
185 Burdwan Division PURBA BARDHAMAN Memari-I AUGUMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR BAGILA,SM/15192 Augmentation Burdwan Sadar Sub-Division ASSISTANT ENGINEER,Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. Junior Engineer,JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE 08/02/2023 14/07/2023 31/08/2025 25/03/2024 17 1,757 302.82 249.37 3 82
186 Burdwan Division PURBA BARDHAMAN Raina-I RETROFITTING OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR DERIAPUR,SM/15195 Retrofitting Burdwan Sadar Sub-Division Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. 08/02/2023 21/03/2023 30/09/2025 25/03/2024 3 1,983 107.27 64.64 15 60
187 Burdwan Division PURBA BARDHAMAN Burdwan-I AUGUMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR CHANDUTIA,SM/15205 Augmentation Burdwan Sadar Sub-Division Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. 07/02/2023 08/02/2023 08/02/2025 25/03/2024 4 0 80.39 0.77 8 1
188 Burdwan Division PURBA BARDHAMAN Ketugram-I RAJUR PIPED WATER SUPPLY SCHEME,SM/15238 New Central Mechanical Sub-Division Assistant Engineer Junior Engineer 07/02/2023 04/12/2023 31/03/2025 25/03/2024 13 2,477 955.81 531.97 47 56
189 Burdwan Division PURBA BARDHAMAN Ketugram-II PURULIA PIPED WATER SUPPLY SCHEME,SM/15239 New Central Mechanical Sub-Division Assistant Engineer Junior Engineer 07/02/2023 18/04/2023 31/03/2025 25/03/2024 13 1,004 459.29 188.69 2 41
190 Burdwan Division PURBA BARDHAMAN Mangolkote KHERUA PIPED WATER SUPPLY SCHEME,SM/15240 New Central Mechanical Sub-Division Assistant Engineer Junior Engineer 07/02/2023 17/02/2023 31/12/2025 25/03/2024 13 1,521 692.15 413.92 75 60
191 Burdwan Division PURBA BARDHAMAN Ketugram-II BILLESWAR PIPED WATER SUPPLY SCHEME,SM/15241 New Central Mechanical Sub-Division Assistant Engineer Junior Engineer 07/02/2023 18/04/2023 31/12/2025 25/03/2024 10 1,647 782.16 300.74 2 38
192 Burdwan Division PURBA BARDHAMAN Bhatar MAHATA PIPED WATER SUPPLY SCHEME,SM/15242 New Durgapur Sub-DIvision ASSISTANT ENGINEER,Assistant Engineer, Durgapur Sub Division, P.H.E. Dte JUNIOR ENGINEER,Junior Engineer2, Durgapur Sub-Division, PHE Dte. 07/02/2023 13/04/2023 31/07/2025 25/03/2024 12 1,751 766.68 327.50 41 43
193 Burdwan Division PURBA BARDHAMAN Bhatar PASHALA PIPED WATER SUPPLY SCHEME,SM/15245 New Durgapur Sub-DIvision ASSISTANT ENGINEER,Assistant Engineer, Durgapur Sub Division, P.H.E. Dte JUNIOR ENGINEER 07/02/2023 08/02/2023 08/02/2025 25/03/2024 8 476 280.13 33.54 4 12
194 Burdwan Division PURBA BARDHAMAN Raina-II Narottambati Piped Water Supply Scheme,SM/15486 New Burdwan Sadar Sub-Division ASSISTANT ENGINEER,Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER 13/02/2023 08/10/2023 31/12/2025 25/03/2024 11 2,297 1,019.43 198.54 2 19
195 Burdwan Division PURBA BARDHAMAN Burdwan-II GROUND WATER BASED GANGPUR PIPED WATER SUPPLY SCHEME,SM/15487 New Burdwan Sadar Sub-Division ASSISTANT ENGINEER,Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. Junior Engineer 13/02/2023 24/08/2023 31/03/2025 25/03/2024 12 3,286 1,236.06 60.04 5 5
196 Burdwan Division PURBA BARDHAMAN Raina-II Chaudanga Piped Water Supply Scheme,SM/15489 New Burdwan Sadar Sub-Division ASSISTANT ENGINEER,Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER 13/02/2023 27/07/2023 31/03/2025 25/03/2024 10 2,994 1,143.73 330.21 2 29
197 Burdwan Division PURBA BARDHAMAN Katwa-I AUGMENTATION OF PANUHAT PIPED WATER SUPPLY SCHEME,SM/15555 Augmentation Central Mechanical Sub-Division Assistant Engineer Junior Engineer 16/02/2023 08/02/2023 08/02/2025 25/03/2024 7 280 380.06 136.68 2 36
198 Burdwan Division PURBA BARDHAMAN Burdwan-I AUGMENTATION RAYAN PART IV (DURGADANGA) PIPED WATER SUPPLY SCHEME,SM/15556 Augmentation Burdwan Sadar Sub-Division ASSISTANT ENGINEER,Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. Junior Engineer 16/02/2023 08/02/2023 08/02/2025 25/03/2024 6 312 216.81 49.61 9 23
199 Burdwan Division PURBA BARDHAMAN Katwa-I AUGMENTATION OF SRIKHANDA PIPED WATER SUPPLY SCHEME,SM/15557 Augmentation Central Mechanical Sub-Division Assistant Engineer Junior Engineer 16/02/2023 08/10/2023 31/03/2025 25/03/2024 7 1,000 722.06 271.40 5 38
200 Burdwan Division PURBA BARDHAMAN Ausgram-II AUGMENTATION BHALKI Z-I & Z-II PWSS,SM/15560 Augmentation Durgapur Sub-DIvision ASSISTANT ENGINEER,Assistant Engineer, Durgapur Sub Division, P.H.E. Dte JUNIOR ENGINEER 16/02/2023 18/05/2023 30/06/2025 25/03/2024 8 600 466.54 35.81 3 8
201 Burdwan Division PURBA BARDHAMAN Raina-II AUGMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR LOHAI,SM/15565 Augmentation Burdwan Sadar Sub-Division ASSISTANT ENGINEER,Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER 16/02/2023 30/05/2023 30/11/2025 25/03/2024 7 150 108.27 6.09 5 6
202 Burdwan Division PURBA BARDHAMAN Memari-II AUGMENTATION OF BERWA PIPED WATER SUPPLY SCHEME,SM/15568 Augmentation Burdwan Sadar Sub-Division ASSISTANT ENGINEER,Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER RWS BURDWAN SUB-DIVISION PHE DTE 16/02/2023 28/08/2023 31/12/2025 25/03/2024 7 594 583.85 151.74 5 26
203 Burdwan Division PURBA BARDHAMAN Katwa-I AUGMENTATION OF SUDPUR PIPED WATER SUPPLY SCHEME,SM/15573 Augmentation Katwa Sub-Division Assistant Engineer 16/02/2023 08/02/2023 08/02/2025 25/03/2024 5 734 523.90 74.02 5 14
204 Burdwan Division PURBA BARDHAMAN Katwa-I MERA PIPE WATER SUPPLY SCHEME ,SM/15575 New Central Mechanical Sub-Division Assistant Engineer Junior Engineer 16/02/2023 15/03/2023 30/09/2025 25/03/2024 17 1,255 559.06 173.57 2 31
205 Burdwan Division PURBA BARDHAMAN Ketugram-I CHAKDAHA PIPED WATER SUPPLY SCHEME,SM/15582 New Central Mechanical Sub-Division Assistant Engineer Junior Engineer 16/02/2023 05/04/2023 30/06/2025 25/03/2024 9 293 207.53 86.87 9 42
206 Burdwan Division PURBA BARDHAMAN Purbasthali-I SHYAMPUR PIPE WATER SUPPLY SCHEME,SM/15585 New Kalna Sub-division Assistant Engineer JUNIOR ENGINEER 16/02/2023 08/02/2023 08/02/2025 25/03/2024 9 813 485.78 190.21 3 39
207 Burdwan Division PURBA BARDHAMAN Kalna-II CHAK SHIMLA PIPE WATER SUPPLY SCHEME.,SM/15586 New Kalna Sub-division Assistant Engineer JUNIOR ENGINEER 16/02/2023 24/08/2023 31/03/2025 25/03/2024 11 1,614 711.87 325.39 2 46
208 Burdwan Division PURBA BARDHAMAN Kalna-II ANGARSON PIPED WATER SUPPLY SCHEME,SM/15587 New Kalna Sub-division Assistant Engineer JUNIOR ENGINEER 16/02/2023 08/02/2023 08/02/2025 25/03/2024 9 1,560 692.97 264.28 2 38
209 Burdwan Division PURBA BARDHAMAN Purbasthali-II AUGMENTATION OF PURBASTHALI SURFACE WATER BASED PWSS ZONE III,SM/15588 Augmentation Kalna Sub-division Assistant Engineer 16/02/2023 08/02/2023 08/02/2025 25/03/2024 6 1,000 793.59 33.64 2 4
210 Burdwan Division PURBA BARDHAMAN Memari-I AUGUMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR RASULPUR,SM/15701 Augmentation Burdwan Sadar Sub-Division ASSISTANT ENGINEER,Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. Junior Engineer,JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE 20/02/2023 31/05/2023 31/03/2025 25/03/2024 11 0 144.48 42.69 5 30
211 Burdwan Division PURBA BARDHAMAN Burdwan-II AUGMENTATION OF GROUND WATER BASED NANDRA PIPE WATER SUPPLY SCHEME,SM/15725 Augmentation Burdwan Sadar Sub-Division Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. 20/02/2023 08/02/2023 08/02/2025 25/03/2024 6 0 96.14 1.32 6 1
212 Burdwan Division PURBA BARDHAMAN Burdwan-I AUGMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR NATUNGRAM,SM/15753 Augmentation Burdwan Sadar Sub-Division Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. 20/02/2023 08/02/2023 08/02/2025 25/03/2024 5 0 126.20 38.53 5 31
213 Burdwan Division PURBA BARDHAMAN Purbasthali-II AUGMENTATION OF PURBASTHALI SURFACE WATER BASED PWSS ZONE II,SM/16014 Augmentation Kalna Sub-division Assistant Engineer 21/02/2023 08/02/2023 08/02/2025 25/03/2024 4 1,000 979.43 28.16 5 3
214 Burdwan Division PURBA BARDHAMAN Katwa-I AUGMENTATION OF EKAIHAT PIPED WATER SUPPLY SCHEME,SM/16017 Augmentation Central Mechanical Sub-Division Assistant Engineer Junior Engineer 21/02/2023 14/07/2023 30/06/2025 25/03/2024 3 150 144.31 93.04 2 64
215 Burdwan Division PURBA BARDHAMAN Kalna-II KASIPUR PIPED WATER SUPPLY SCHEME,SM/16019 New Kalna Sub-division Assistant Engineer JUNIOR ENGINEER 21/02/2023 24/08/2023 31/03/2025 25/03/2024 9 1,617 717.23 176.20 2 25
216 Burdwan Division PURBA BARDHAMAN Mangolkote MASARU PIPE WATER SUPPLY SCHEME,SM/16020 New Central Mechanical Sub-Division Assistant Engineer Junior Engineer 21/02/2023 08/10/2023 31/03/2025 25/03/2024 8 843 399.50 227.21 3 57
217 Burdwan Division PURBA BARDHAMAN Kalna-II SABIDPUR PIPED WATER SUPPLY SCHEME,SM/16021 New Kalna Sub-division Assistant Engineer JUNIOR ENGINEER 21/02/2023 24/08/2023 31/03/2025 25/03/2024 11 1,769 783.85 209.75 8 27
218 Burdwan Division PURBA BARDHAMAN Katwa-II AUGMENTATION OF SAHAPUR PIPED WATER SUPPLY SCHEME,SM/16022 Augmentation Central Mechanical Sub-Division Assistant Engineer Junior Engineer,JUNIOR ENGINEER KATWA SUB-DIVISION PHE DTE 21/02/2023 22/05/2023 30/06/2025 25/03/2024 3 130 145.22 131.20 55 90
219 Burdwan Division PURBA BARDHAMAN Ketugram-I AMEGERIA PIPED WATER SUPPLY SCHEME,SM/16023 New Central Mechanical Sub-Division Assistant Engineer Junior Engineer 21/02/2023 08/02/2023 08/02/2025 25/03/2024 10 1,863 649.63 179.52 3 28
220 Burdwan Division PURBA BARDHAMAN Kalna-II BHABANANDAPUR PIPED WATER SUPPLY SCHEME,SM/16024 New Kalna Sub-division Assistant Engineer 21/02/2023 08/02/2023 08/02/2025 25/03/2024 9 1,470 660.06 238.07 2 36
221 Burdwan Division PURBA BARDHAMAN Ketugram-I MAHULA PIPED WATER SUPPLY SCHEME,SM/16025 New Central Mechanical Sub-Division Assistant Engineer Junior Engineer 21/02/2023 22/08/2023 31/03/2025 25/03/2024 12 946 423.81 189.38 3 45
222 Burdwan Division PURBA BARDHAMAN Mangolkote NAYAPARA PIPED WATER SUPPLY SCHEME ,SM/16026 New Central Mechanical Sub-Division Assistant Engineer Junior Engineer 21/02/2023 08/02/2023 08/02/2025 25/03/2024 11 567 286.69 116.73 3 41
223 Burdwan Division PURBA BARDHAMAN Kalna-II DAFARPUR PIPED WATER SUPPLY SCHEME,SM/16028 New Kalna Sub-division Assistant Engineer JUNIOR ENGINEER 21/02/2023 08/02/2023 08/02/2025 25/03/2024 15 720 417.08 146.30 3 35
224 Burdwan Division PURBA BARDHAMAN Kalna-II PATHAR GHATA PIPED WATER SUPPLY SCHEME,SM/16029 New Kalna Sub-division Assistant Engineer JUNIOR ENGINEER 21/02/2023 24/08/2023 31/03/2025 25/03/2024 11 1,692 749.43 139.99 2 19
225 Burdwan Division PURBA BARDHAMAN Ketugram-I BAKALSA PIPE WATER SUPPLY SCHEME,SM/16030 New Central Mechanical Sub-Division Assistant Engineer Junior Engineer 21/02/2023 08/02/2023 08/02/2025 25/03/2024 8 457 268.67 109.19 6 41
226 Burdwan Division PURBA BARDHAMAN Purbasthali-I SHANKRA PIPE WATER SUPPLY SCHEME,SM/16032 New Kalna Sub-division Assistant Engineer JUNIOR ENGINEER 21/02/2023 08/02/2023 08/02/2025 25/03/2024 7 1,047 470.45 8.59 2 2
227 Burdwan Division PURBA BARDHAMAN Ketugram-II LOHARUNDI PIPED WATER SUPPLY SCHEME,SM/16033 New Central Mechanical Sub-Division Assistant Engineer Junior Engineer 21/02/2023 08/02/2023 08/02/2025 25/03/2024 9 284 256.48 100.49 2 39
228 Burdwan Division PURBA BARDHAMAN Purbasthali-II GHUNI PIPE WATER SUPPLY SCHEME,SM/16034 New Kalna Sub-division Assistant Engineer JUNIOR ENGINEER 21/02/2023 08/10/2023 31/03/2025 25/03/2024 11 1,008 451.58 191.69 6 42
229 Burdwan Division PURBA BARDHAMAN Kalna-II KHARGAKUR PIPED WATER SUPPLY SCHEME,SM/16035 New Kalna Sub-division Assistant Engineer JUNIOR ENGINEER 21/02/2023 23/08/2023 31/03/2025 25/03/2024 10 1,294 571.41 217.16 8 38
230 Burdwan Division PURBA BARDHAMAN Kalna-II KUSDANGA PIPED WATER SUPPLY SCHEME,SM/16036 New Kalna Sub-division Assistant Engineer JUNIOR ENGINEER 21/02/2023 08/02/2023 08/02/2025 25/03/2024 10 865 493.57 178.30 2 36
231 Burdwan Division PURBA BARDHAMAN Kalna-II AUGMENTATION OF PURBASAHAPUR PIPED WATER SUPPLY SCHEME,SM/16193 Augmentation Kalna Sub-division Assistant Engineer JUNIOR ENGINEER 23/02/2023 08/02/2023 08/02/2025 25/03/2024 3 200 214.58 15.54 4 7
232 Burdwan Division PURBA BARDHAMAN Kalna-II AUGMENTATION OF BUNDEBAJ PIPED WATER SUPPLY SCHEME,SM/16196 Augmentation Kalna Sub-division Assistant Engineer 23/02/2023 08/02/2023 08/02/2025 25/03/2024 5 280 262.71 40.62 10 15
233 Burdwan Division PURBA BARDHAMAN Raina-I RASUIKHANDA PIPED WATER SUPPLY SCHEME,SM/16253 New Burdwan Sadar Sub-Division ASSISTANT ENGINEER,Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER,JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE 24/02/2023 04/12/2023 31/03/2025 25/03/2024 12 2,353 996.62 682.24 90 68
234 Burdwan Division PURBA BARDHAMAN Raina-I UCHITPUR PIPED WATER SUPPLY SINGLE VILLAGE SCHEME,SM/16254 New Burdwan Sadar Sub-Division ASSISTANT ENGINEER,Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER 24/02/2023 24/03/2023 31/12/2025 25/03/2024 12 446 254.97 100.43 70 39
235 Burdwan Division PURBA BARDHAMAN Ketugram-II JHAMATPUR PIPED WATER SUPPLY SCHEME,SM/16256 New Central Mechanical Sub-Division Assistant Engineer Junior Engineer 24/02/2023 23/05/2023 30/04/2025 25/03/2024 9 655 361.18 174.46 31 48
236 Burdwan Division PURBA BARDHAMAN Kalna-II DWARIATAN PIPED WATER SUPPLY SCHEME,SM/16285 New Kalna Sub-division Assistant Engineer JUNIOR ENGINEER 23/02/2023 24/08/2023 31/03/2025 25/03/2024 8 1,996 891.16 142.51 3 16
237 Burdwan Division PURBA BARDHAMAN Kalna-II BIRUHA PIPED WATER SUPPLY SCHEME,SM/16287 New RWS Burdwan Sub-Division Assistant Engineer JUNIOR ENGINEER,Junior Engineer, R.W.S. Burdwan Sub Division, P.H.E. Dte 23/02/2023 24/08/2023 31/03/2025 25/03/2024 11 1,813 813.40 231.62 2 28
238 Burdwan Division PURBA BARDHAMAN Manteswar RETROFITTING OF MAJHERGRAM PIPED WATER SUPPLY SCHEME(PART-B),SM/16290 Retrofitting Kalna Sub-division Assistant Engineer 23/02/2023 03/01/2023 31/03/2025 25/03/2024 6 600 167.64 57.89 20 35
239 Burdwan Division PURBA BARDHAMAN Purbasthali-II AUGMENTATION OF JHAUDANGA (PART-B) PIPED WATER SUPPLY SCHEME,SM/16293 Augmentation Kalna Sub-division Assistant Engineer JUNIOR ENGINEER 23/02/2023 08/02/2023 08/02/2025 25/03/2024 5 300 252.07 98.63 5 39
240 Burdwan Division PURBA BARDHAMAN Purbasthali-II AUGMENTATION OF KASHIPUR PIPED WATER SUPPLY SCHEME,SM/16297 Augmentation Kalna Sub-division Assistant Engineer JUNIOR ENGINEER 23/02/2023 06/01/2023 30/09/2025 25/03/2024 6 300 254.93 130.57 9 51
241 Burdwan Division PURBA BARDHAMAN Purbasthali-I AUGMENTATION OF NADANGHAT PIPED WATER SUPPLY SCHEME,SM/16298 Augmentation Kalna Sub-division Assistant Engineer JUNIOR ENGINEER 23/02/2023 05/03/2023 30/06/2025 25/03/2024 8 0 379.10 23.58 2 6
242 Burdwan Division PURBA BARDHAMAN Kalna-II AUGMENTATION OF KALYANPUR PIPED WATER SUPPLY SCHEME,SM/16299 Augmentation Kalna Sub-division Assistant Engineer JUNIOR ENGINEER 23/02/2023 08/02/2023 08/02/2025 25/03/2024 4 200 205.59 124.73 5 61
243 Burdwan Division PURBA BARDHAMAN Kalna-II AUGMENTATION OF KULTI PIPED WATER SUPPLY SCHEME,SM/16301 Augmentation Kalna Sub-division Assistant Engineer JUNIOR ENGINEER 23/02/2023 08/02/2023 08/02/2025 25/03/2024 6 250 301.70 90.21 10 30
244 Burdwan Division PURBA BARDHAMAN Purbasthali-I GAHAK PIPE WATER SUPPLY SCHEME,SM/16303 New Kalna Sub-division Assistant Engineer JUNIOR ENGINEER 23/02/2023 08/02/2023 08/02/2025 25/03/2024 9 924 414.78 110.15 2 27
245 Burdwan Division PURBA BARDHAMAN Purbasthali-II AUGMENTATION OF PURBASTHALI SURFACE WATER BASED PWSS ZONE IV,SM/16307 Augmentation Kalna Sub-division Assistant Engineer 23/02/2023 20/07/2023 31/03/2025 25/03/2024 7 1,000 965.63 128.30 5 13
246 Burdwan Division PURBA BARDHAMAN Kalna-II SADHPUKHARIA PIPED WATER SUPPLY SCHEME ,SM/16308 New Kalna Sub-division Assistant Engineer JUNIOR ENGINEER 23/02/2023 24/04/2023 30/09/2025 25/03/2024 11 401 179.63 128.57 61 72
247 Burdwan Division PURBA BARDHAMAN Mangolkote PURBA NAYAPARA PIPE WATER SUPPLY SCHEME,SM/16477 New Central Mechanical Sub-Division Assistant Engineer Junior Engineer 02/03/2023 08/02/2023 08/02/2025 25/03/2024 11 1,812 753.31 153.04 3 20
248 Burdwan Division PURBA BARDHAMAN Kalna-II BALINDAR PIPED WATER SUPPLY SCHEME,SM/16478 New Kalna Sub-division Assistant Engineer JUNIOR ENGINEER 02/03/2023 24/08/2023 31/03/2025 25/03/2024 14 2,511 996.62 125.79 2 13
249 Burdwan Division PURBA BARDHAMAN Burdwan-II AUGUMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR SHAKTIGARH,SM/16479 Augmentation Burdwan Sadar Sub-Division ASSISTANT ENGINEER,Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. Junior Engineer 02/03/2023 12/07/2023 31/07/2025 25/03/2024 14 1,946 433.76 108.00 11 25
250 Burdwan Division PURBA BARDHAMAN Ketugram-I ARGUN PIPED WATER SUPPLY SCHEME,SM/16482 New Central Mechanical Sub-Division Assistant Engineer Junior Engineer 02/03/2023 21/08/2023 31/12/2025 25/03/2024 12 1,637 606.69 311.87 5 51
251 Burdwan Division PURBA BARDHAMAN Kalna-II AKALPAUSH PIPE WATER SUPPLY SCHEME,SM/16485 New RWS Burdwan Sub-Division Assistant Engineer JUNIOR ENGINEER,Junior Engineer, R.W.S. Burdwan Sub Division, P.H.E. Dte 02/03/2023 24/08/2023 31/03/2025 25/03/2024 13 2,094 921.29 325.66 5 35
252 Burdwan Division PURBA BARDHAMAN Burdwan-I AUGMENTATION OF RAYAN (PART-II) PWSS,SM/16486 Augmentation Burdwan Sadar Sub-Division ASSISTANT ENGINEER,Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. Junior Engineer 02/03/2023 08/02/2023 08/02/2025 25/03/2024 6 4,085 772.37 5.11 5 1
253 Burdwan Division PURBA BARDHAMAN Raina-I RETROFITTING OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR MUGURA ,SM/16488 Retrofitting Burdwan Sadar Sub-Division Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. 02/03/2023 08/02/2023 08/02/2025 25/03/2024 3 606 39.97 19.33 20 48
254 Burdwan Division PURBA BARDHAMAN Manteswar KHANPUR PIPED WATER SUPPLY SCHEME,SM/16540 New Kalna Sub-division Assistant Engineer JUNIOR ENGINEER 10/03/2023 08/02/2023 08/02/2025 25/03/2024 13 3,321 1,171.58 83.44 2 7
255 Burdwan Division PURBA BARDHAMAN Raina-I NETRAKHANDA PIPED WATER SUPPLY SCHEME,SM/16616 New Burdwan Sadar Sub-Division ASSISTANT ENGINEER,Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER 14/03/2023 08/02/2023 08/02/2025 25/03/2024 10 1,424 663.07 41.41 5 6
256 Burdwan Division PURBA BARDHAMAN Burdwan-I NERAGOHALIA PIPED WATER SUPPLY SCHEME,SM/16617 New Burdwan Sadar Sub-Division ASSISTANT ENGINEER,Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. Junior Engineer 14/03/2023 08/09/2023 31/03/2025 25/03/2024 9 2,895 998.07 255.66 2 26
257 Burdwan Division PURBA BARDHAMAN Raina-I BAJITPUR PIPED WATER SUPPLY SCHEME,SM/16619 New Burdwan Sadar Sub-Division ASSISTANT ENGINEER,Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER 14/03/2023 24/07/2023 30/09/2025 25/03/2024 8 1,500 680.19 63.40 25 9
258 Burdwan Division PURBA BARDHAMAN Khandaghosh AUGMENTATION OF GROUND WATER BASED SAGRAI PWSS (PART B),SM/16774 Augmentation Burdwan Sadar Sub-Division ASSISTANT ENGINEER,Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. Junior Engineer 13/03/2023 03/03/2023 31/03/2025 25/03/2024 16 0 275.12 96.97 10 35
259 Burdwan Division PURBA BARDHAMAN Burdwan-I AUGMENTATION OF TALIT-SIMDAL PWSS (PART-B),SM/18112 Augmentation Burdwan Sadar Sub-Division ASSISTANT ENGINEER,Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. Junior Engineer 27/03/2023 08/02/2023 08/02/2025 25/03/2024 7 0 296.54 14.49 8 5
260 Burdwan Division PURBA BARDHAMAN Memari-I AMADPUR PIPED WATER SUPPLY SCHEME,SM/18146 New Burdwan Sadar Sub-Division ASSISTANT ENGINEER,Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE 29/03/2023 14/09/2023 31/07/2025 25/03/2024 7 1,499 571.48 113.87 2 20
261 Burdwan Division PURBA BARDHAMAN Khandaghosh SASANGA PIPED WATER SUPPLY SCHEME,SM/18245 New 16/06/2023 05/04/2023 31/12/2025 25/03/2024 11 3,700 1,466.25 580.98 2 40
262 Burdwan Division PURBA BARDHAMAN Burdwan-I NALA PIPED WATER SUPPLY SCHEME,SM/18256 New 21/06/2023 08/02/2023 31/03/2025 25/03/2024 10 3,779 1,246.49 314.81 2 25
263 Burdwan Division PURBA BARDHAMAN Raina-I BANTIR PIPED WATER SUPPLY SCHEME,SM/18300 New 26/06/2023 27/07/2023 31/03/2025 25/03/2024 16 2,936 1,286.37 549.98 2 43
264 Burdwan Division PURBA BARDHAMAN Kalna-II JIUDHARA PWSS,SM/18314 New 26/06/2023 08/02/2023 08/02/2025 25/03/2024 12 2,709 1,124.56 217.05 2 19
265 Burdwan Division PURBA BARDHAMAN Burdwan-II Balgana Piped Water Supply Scheme,SM/18326 New 27/06/2023 24/08/2023 31/03/2025 25/03/2024 11 2,564 1,124.71 146.08 3 13
266 Burdwan Division PURBA BARDHAMAN Katwa-I BAINCHI PIPED WATER SUPPLY SCHEME,SM/18335 New 03/07/2023 08/10/2023 31/12/2025 25/03/2024 11 2,450 1,089.20 166.10 3 15
267 Burdwan Division PURBA BARDHAMAN Raina-I SANKARPUR PIPED WATER SUPPLY SCHEME,SM/18337 New 04/07/2023 27/07/2023 31/03/2025 25/03/2024 11 3,257 1,151.61 365.39 2 32
268 Burdwan Division PURBA BARDHAMAN Raina-I BELSHAR PIPED WATER SUPPLY SCHEME ,SM/18338 New 04/07/2023 27/07/2023 31/03/2025 25/03/2024 10 3,434 1,185.09 589.78 2 50
269 Burdwan Division PURBA BARDHAMAN Mangolkote HALIMPUR PIPE WATER SUPPLY SCHEME,SM/18343 New 04/07/2023 08/08/2023 31/12/2025 25/03/2024 12 3,829 1,198.96 36.85 3 3
270 Burdwan Division PURBA BARDHAMAN Manteswar Detailed Project Report of Ground Water Supply Based Piped Water Supply Scheme For MIRGHAR PWSS in Manteshwar Block of Purab Burdwan District under Burdwan Division, PHE Dte.,SM/18365 New 11/07/2023 19/07/2023 31/07/2025 25/03/2024 13 4,783 1,436.61 825.49 41 57
271 Burdwan Division PURBA BARDHAMAN Katwa-I KASIGRAM PIPE WATER SUPPLY SCHEME,SM/18367 New 11/07/2023 24/07/2023 30/09/2025 25/03/2024 9 3,024 1,354.92 730.61 24 54
272 Burdwan Division PURBA BARDHAMAN Burdwan-II Ichalabad Piped Water Supply Scheme,SM/18404 New 12/07/2023 31/07/2023 31/03/2025 25/03/2024 8 2,647 1,170.91 78.97 2 7
273 Burdwan Division PURBA BARDHAMAN Bhatar SANTOSHPUR PIPED WATER SUPPLY SCHEME,SM/18405 New Durgapur Sub-DIvision Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer2, Durgapur Sub-Division, PHE Dte. 12/07/2023 31/07/2023 31/03/2025 25/03/2024 10 2,995 1,130.16 358.80 8 32
274 Burdwan Division PURBA BARDHAMAN Raina-II Bara Bainan Piped Water Supply Scheme,SM/18406 New 12/07/2023 27/07/2023 31/03/2025 25/03/2024 14 2,814 1,077.31 336.80 5 31
275 Burdwan Division PURBA BARDHAMAN Burdwan-II HATSIMUL PIPED WATER SUPPLY SCHEME,SM/18409 New 12/07/2023 31/07/2023 31/03/2025 25/03/2024 9 2,529 1,338.50 320.62 5 24
276 Burdwan Division PURBA BARDHAMAN Kalna-I AUGMENTATION OF SIMLON PWSS FOR PROVIDING FUNCTIONAL HOUSEHOLD TAP CONNECTION (FHTC) BLOCK KALNA I PURBA BARDHAMAN WEST BENGAL,SM/18439 Augmentation 18/07/2023 08/08/2023 31/03/2025 25/03/2024 10 9,130 2,281.19 1,205.28 29 53
277 Burdwan Division PURBA BARDHAMAN Mangolkote KULSANA PIPE WATER SUPPLY SCHEME,SM/18440 New 18/07/2023 08/08/2023 31/03/2026 25/03/2024 12 3,613 1,230.88 284.73 2 23
278 Burdwan Division PURBA BARDHAMAN Katwa-I GUSUMBA PIPED WATER SUPPLY SCHEME,SM/18441 New 18/07/2023 08/02/2023 31/03/2025 25/03/2024 10 3,423 1,434.92 425.11 3 30
279 Burdwan Division PURBA BARDHAMAN Katwa-II AURIA PIPED WATER SUPPLY SCHEME,SM/18455 New 20/07/2023 24/07/2023 31/07/2025 25/03/2024 12 3,373 1,320.64 781.90 10 59
280 Burdwan Division PURBA BARDHAMAN Katwa-II MEJHIARI PIPED WATER SUPPLY SCHEME,SM/18456 New 20/07/2023 31/07/2023 31/03/2025 25/03/2024 17 2,700 1,088.20 621.51 13 57
281 Burdwan Division PURBA BARDHAMAN Mangolkote LAKSHIMPUR PWSS,SM/18457 New 20/07/2023 08/02/2023 08/02/2025 25/03/2024 9 2,881 1,048.15 247.03 2 24
282 Burdwan Division PURBA BARDHAMAN Katwa-II AMUL PIPED WATER SUPPLY SCHEME,SM/18458 New 20/07/2023 24/07/2023 31/07/2025 25/03/2024 10 3,098 1,267.14 709.79 3 56
283 Burdwan Division PURBA BARDHAMAN Mangolkote SIMULIA PIPE WATER SUPPLY SCHEME,SM/18459 New 20/07/2023 08/02/2023 08/02/2025 25/03/2024 12 2,525 1,023.66 333.57 2 33
284 Burdwan Division PURBA BARDHAMAN Katwa-II KARUI PIPED WATER SUPPLY SCHEME,SM/18460 New 20/07/2023 08/02/2023 08/02/2025 25/03/2024 21 3,523 1,346.35 874.64 30 65
285 Burdwan Division PURBA BARDHAMAN Katwa-I NANAGAR PIPED WATER SUPPLY SCHEME ,SM/18479 New 24/07/2023 08/10/2023 31/03/2025 25/03/2024 12 2,833 1,161.50 211.27 5 18
286 Burdwan Division PURBA BARDHAMAN Katwa-I BANDMURA PIPED WATER SUPPLY SCHEME,SM/18480 New 24/07/2023 08/02/2023 08/02/2025 25/03/2024 15 3,491 1,451.41 301.17 24 21
287 Burdwan Division PURBA BARDHAMAN Mangolkote PALISGRAM PIPE WATER SUPPLY SCHEME,SM/18481 New 24/07/2023 08/02/2023 08/02/2025 25/03/2024 10 3,319 1,222.80 136.07 3 11
288 Burdwan Division PURBA BARDHAMAN Raina-II DIGHRA PIPED WATER SUPPLY SCHEME,SM/18482 New 24/07/2023 08/10/2023 31/03/2025 25/03/2024 10 2,767 1,127.12 316.99 2 28
289 Burdwan Division PURBA BARDHAMAN Katwa-I KARAJGRAM PIPED WATER SUPPLY SCHEME,SM/18483 New 24/07/2023 08/02/2023 31/03/2025 25/03/2024 10 2,942 1,319.23 272.55 2 21
290 Burdwan Division PURBA BARDHAMAN Katwa-I KHAJURDIHI PIPE WATER SUPPLY SCHEME,SM/18484 New 24/07/2023 08/10/2023 31/12/2025 25/03/2024 14 3,132 1,133.66 391.84 3 35
291 Burdwan Division PURBA BARDHAMAN Katwa-I GIDHGRAM PIPED WATER SUPPLY SCHEME,SM/18485 New 24/07/2023 08/07/2023 31/08/2025 25/03/2024 12 3,309 1,409.11 416.87 5 30
292 Burdwan Division PURBA BARDHAMAN Memari-II REAN PIPED WATER SUPPLY SCHEME,SM/18504 New 26/07/2023 08/09/2023 31/03/2025 25/03/2024 9 2,477 1,136.79 418.08 2 37
293 Burdwan Division PURBA BARDHAMAN Manteswar KHANDRA PIPED WATER SUPPLY SCHEME,SM/18505 New 26/07/2023 08/02/2023 08/02/2025 25/03/2024 11 3,199 1,127.09 263.37 2 23
294 Burdwan Division PURBA BARDHAMAN Memari-II BIJUR PIPED WATER SUPPLY SCHEME,SM/18605 New 31/07/2023 08/09/2023 31/03/2025 25/03/2024 12 2,607 1,119.15 416.62 2 37
295 Burdwan Division PURBA BARDHAMAN Khandaghosh BERUGRAM PIPED WATER SUPPLY SCHEME,SM/18606 New 31/07/2023 08/02/2023 08/02/2025 25/03/2024 15 3,294 1,245.10 349.89 38 28
296 Burdwan Division PURBA BARDHAMAN Khandaghosh SULTANPUR PIPED WATER SUPPLY SCHEME,SM/18607 New 31/07/2023 08/02/2023 08/02/2025 25/03/2024 10 2,849 1,246.66 349.83 38 28
297 Burdwan Division PURBA BARDHAMAN Memari-II BISHNUPUR PIPED WATER SUPPLY SCHEME,SM/18608 New 31/07/2023 08/07/2023 31/03/2025 25/03/2024 14 3,799 1,610.96 793.06 14 49
298 Burdwan Division PURBA BARDHAMAN Memari-I CHANCHAL PIPED WATER SUPPLY SCHEME,SM/18609 New 31/07/2023 08/02/2023 08/02/2025 25/03/2024 12 3,013 1,327.85 287.87 2 22
299 Burdwan Division PURBA BARDHAMAN Memari-I SANUI PIPED WATER SUPPLY SCHEME ,SM/18610 New 31/07/2023 08/10/2023 31/12/2025 25/03/2024 12 3,764 1,535.64 332.65 3 22
300 Burdwan Division PURBA BARDHAMAN Memari-I NUDIPUR PIPED WATER SUPPLY SCHEME,SM/18834 New 21/09/2023 14/09/2023 31/03/2026 25/03/2024 11 2,769 1,111.74 100.57 2 9
301 Burdwan Division PURBA BARDHAMAN Raina-I AUGMENTATION OF GROUND WATER BASED RAINA (PART-B) PWSS TO ACCOMODATE FHTC IN RAINA-I BLOCK WITH IN PURBA BARDHAMAN DISTRICT UNDER BURDWAN DIVISION PHE DTE.,SM/19113 Augmentation 22/12/2023 18/01/2024 18/04/2025 25/03/2024 4 0 123.42 1.85 5 2
Total 3,366 6,95,374 2,16,367.43 86,544.68   40