| 1 |
Tamluk Division |
PURBA MEDINIPUR |
Contai - I |
Retrofitting to accomodate FHTC under JJM in Uttar Charaikhia W/S Scheme Under Contai-I Block,SM/07478 |
Retrofitting |
|
|
|
29/12/2020 |
07/02/2018 |
31/12/2025 |
29/12/2025 |
4 |
937 |
46.94 |
90.49 |
99 |
193 |
| 2 |
Tamluk Division |
PURBA MEDINIPUR |
Tamluk |
Retrofitting to accomodate FHTC under JJM in Srirampur PWSS under Tamluk Block.,SM/07653 |
Retrofitting |
|
|
|
07/01/2021 |
18/01/2016 |
31/03/2025 |
29/12/2025 |
4 |
2,382 |
116.61 |
228.71 |
95 |
196 |
| 3 |
Tamluk Division |
PURBA MEDINIPUR |
Mahisadal |
Retrofitting to accomodate FHTC under JJM in Keshabpur Jalpai PWSS Block - Mahishadal in the District of Purba Medinipur.,SM/07659 |
Retrofitting |
|
|
|
07/01/2021 |
18/02/2016 |
30/09/2025 |
29/12/2025 |
6 |
4,683 |
228.34 |
445.49 |
95 |
195 |
| 4 |
Tamluk Division |
PURBA MEDINIPUR |
Ramnagar - I |
Retrofitting to accomodate FHTC under JJM in Paya(Mahaprabhu) W/S Scheme,SM/08232 |
Retrofitting |
|
|
|
09/02/2021 |
07/02/2018 |
31/12/2025 |
29/12/2025 |
2 |
1,375 |
102.22 |
122.13 |
98 |
119 |
| 5 |
Tamluk Division |
PURBA MEDINIPUR |
|
Requirement of chemicals, glassware and instrument equipment of Purba Medinipur District Laboratory for NABL Accreditation under Tamluk Division,SM/08683 |
Support |
Tamluk Sadar Sub-Division |
Assistant Engineer |
Junior Engineer |
23/08/2021 |
24/08/2021 |
31/12/2023 |
22/05/2023 |
4 |
0 |
15.07 |
14.36 |
60 |
95 |
| 6 |
Tamluk Division |
PURBA MEDINIPUR |
Ramnagar - I |
Providing of drinking water supply of different source-less AWCs from different running PWSS under RWS, Tamluk Sub-Division of Tamluk Division.,SM/08698 |
New |
|
|
|
01/09/2021 |
13/09/2021 |
31/03/2025 |
29/12/2025 |
44 |
0 |
746.17 |
630.13 |
95 |
84 |
| 7 |
Tamluk Division |
PURBA MEDINIPUR |
Ramnagar - II |
RETROFITTING TO ACCOMMODATE FHTC UNDER JJM IN PALDHUI PWSS UNDER RAMNAGAR - II BLOCK,SM/08746 |
Retrofitting |
|
|
|
09/09/2021 |
07/02/2018 |
31/12/2025 |
29/12/2025 |
2 |
1,575 |
98.91 |
129.99 |
79 |
131 |
| 8 |
Tamluk Division |
PURBA MEDINIPUR |
Ramnagar - II |
RETROFITTING TO ACCOMMODATE FHTC UNDER JJM IN BHERIBARANGA PWSS UNDER RAMNAGAR - II BLOCK,SM/08753 |
Retrofitting |
|
|
|
09/09/2021 |
07/02/2018 |
31/03/2025 |
29/12/2025 |
2 |
1,950 |
100.13 |
134.86 |
95 |
135 |
| 9 |
Tamluk Division |
PURBA MEDINIPUR |
Moyna |
Retrofitting to Accommodate FHTC under JJM in DONA Zone-I Balance Work Water Supply Scheme Block Moyna in the District of Purba Medinipur.,SM/08755 |
Retrofitting |
|
|
|
09/09/2021 |
18/07/2016 |
31/12/2025 |
29/12/2025 |
3 |
1,897 |
91.37 |
112.88 |
99 |
124 |
| 10 |
Tamluk Division |
PURBA MEDINIPUR |
Moyna |
Retrofitting to Accommodate FHTC under JJM in DONA Zone-II Balance Work Water Supply Scheme Block Moyna in the District of Purba Medinipur.,SM/08756 |
Retrofitting |
|
|
|
09/09/2021 |
18/07/2016 |
31/12/2025 |
29/12/2025 |
2 |
899 |
42.75 |
82.61 |
99 |
193 |
| 11 |
Tamluk Division |
PURBA MEDINIPUR |
Deshopran |
Solar Operated Standalone Water Supply Arrangement with Subsequent Functional Household Tap Connection FHTC at different location within Purba Medinipur District under Tamluk Division, PHE Dte. ,SM/08759 |
Retrofitting |
|
|
|
09/09/2021 |
10/09/2021 |
31/12/2025 |
29/12/2025 |
12 |
1,600 |
471.12 |
392.24 |
90 |
83 |
| 12 |
Tamluk Division |
PURBA MEDINIPUR |
Moyna |
Shyampur Piped Water Supply Scheme.,SM/08878 |
New |
|
|
|
24/09/2021 |
24/09/2021 |
31/03/2025 |
29/12/2025 |
22 |
2,571 |
800.17 |
602.16 |
99 |
75 |
| 13 |
Tamluk Division |
PURBA MEDINIPUR |
Bhagawanpur - II |
Baharampur Piped Water Supply Scheme.,SM/08879 |
New |
|
|
|
24/09/2021 |
24/09/2021 |
31/03/2025 |
29/12/2025 |
22 |
2,296 |
688.64 |
561.38 |
99 |
82 |
| 14 |
Tamluk Division |
PURBA MEDINIPUR |
|
Drinking water sample collection & testing through Filed Test Kits (FTKs) & uploading charges for the same related to Water Quality Monitoring & Surveillance Programme.,SM/09021 |
Support |
|
|
|
30/10/2021 |
25/11/2022 |
31/12/2023 |
05/10/2023 |
5 |
0 |
43.76 |
43.75 |
30 |
100 |
| 15 |
Tamluk Division |
PURBA MEDINIPUR |
|
Engagement of Implementation Support Agency (ISA) for Implementation of Community Mobilization and Capacity Building Activities under JJM Support Activities at Purba Medinipur District.,SM/09022 |
Support |
|
|
|
30/10/2021 |
03/08/2023 |
31/03/2024 |
05/10/2023 |
45 |
0 |
548.34 |
528.27 |
15 |
96 |
| 16 |
Tamluk Division |
PURBA MEDINIPUR |
Deshopran |
Augmentation of Ground Water Based Piped Water Supply Scheme for Basudebberya,SM/09034 |
Augmentation |
Contai Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Junior Engineer,Sri Mrityunjoy Paria, JE/Haldia Electrical Sub-Division. |
30/10/2021 |
03/11/2021 |
31/12/2025 |
29/12/2025 |
15 |
3,041 |
829.85 |
527.31 |
95 |
64 |
| 17 |
Tamluk Division |
PURBA MEDINIPUR |
Contai - I |
Retrofitting to accommodate FHTC under JJM in Uttar Charikhia PWSS under Contai I Block (Phase-II).,SM/09047 |
Retrofitting |
|
|
|
29/10/2021 |
07/02/2018 |
31/12/2025 |
29/12/2025 |
1 |
180 |
17.78 |
17.26 |
99 |
97 |
| 18 |
Tamluk Division |
PURBA MEDINIPUR |
Egra - I |
Retorfitting to accommodate FHTC under JJM in Panchrol PWSS under Egra I Block (Phase-I),SM/09056 |
Retrofitting |
|
|
|
29/10/2021 |
07/02/2018 |
31/12/2025 |
29/12/2025 |
6 |
1,600 |
88.01 |
85.36 |
80 |
97 |
| 19 |
Tamluk Division |
PURBA MEDINIPUR |
Egra - II |
Retorfitting to accommodate FHTC under JJM in Dulalpur PWSS.,SM/09057 |
Retrofitting |
|
|
|
29/10/2021 |
07/02/2018 |
31/03/2025 |
29/12/2025 |
1 |
1,166 |
59.18 |
57.41 |
98 |
97 |
| 20 |
Tamluk Division |
PURBA MEDINIPUR |
Tamluk |
Balance Work for Retrofitting to Accommodate FHTC (300 nos) and Laying of Left-Out Portion UPVC Pipeline due to uncovered area of different Nodal point of Srirampur and its Adjoining Mouzas Water Supply Scheme under JJM within Tamluk Block under Tamluk S,SM/09073 |
Retrofitting |
|
|
|
28/10/2021 |
18/01/2016 |
31/03/2025 |
29/12/2025 |
1 |
300 |
21.74 |
18.98 |
95 |
87 |
| 21 |
Tamluk Division |
PURBA MEDINIPUR |
Panskura |
Rejuvenation & Retrofitting of Ground Water Based Dakshin Mechogram PWSS to Accommodate FHTC in Panskura Block under Tamluk Sub-Division of Tamluk Division in Purba Medinipur District.,SM/09272 |
Augmentation |
Tamluk Sadar Sub-Division |
Assistant Engineer |
Junior Engineer |
03/11/2021 |
25/01/2022 |
31/12/2025 |
29/12/2025 |
10 |
2,201 |
366.83 |
331.54 |
75 |
90 |
| 22 |
Tamluk Division |
PURBA MEDINIPUR |
Sahid Matangini |
Rejuvenation and Retrofitting of Ground Water Based Chatra PWSS to accommodate FHTC in Sahid Matangini Block under Tamluk Sub Division of Tamluk Division in Purba Medinipur District ,SM/09273 |
Augmentation |
Tamluk Sadar Sub-Division |
Assistant Engineer |
Junior Engineer |
03/11/2021 |
20/01/2022 |
31/12/2025 |
29/12/2025 |
6 |
1,592 |
249.69 |
69.05 |
50 |
28 |
| 23 |
Tamluk Division |
PURBA MEDINIPUR |
Ramnagar - II |
Different Works for Providing Functional Household Tap Connection (FHTC) by Augmentation of Mandar Water Supply Scheme.,SM/09274 |
Augmentation |
Digha Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Junior Engineer,Sri Ujjal Kumar Dey, JE/Haldia Electrical Sub-Division. |
03/11/2021 |
11/02/2022 |
31/12/2025 |
29/12/2025 |
13 |
967 |
359.88 |
182.43 |
55 |
51 |
| 24 |
Tamluk Division |
PURBA MEDINIPUR |
Chandipur |
Rejuvenation & Retrofitting of Ground Water Based Muradpur PWSS to Accommodate FHTC in Chandipur Block under Tamluk Sub-Division of Tamluk Division in Purba Medinipur.,SM/09275 |
Augmentation |
RWS Tamluk Sub-Division |
|
Junior Engineer |
03/11/2021 |
02/12/2021 |
31/12/2025 |
29/12/2025 |
8 |
1,878 |
478.65 |
449.54 |
95 |
94 |
| 25 |
Tamluk Division |
PURBA MEDINIPUR |
Mahisadal |
Different works for Providing Functional Household Tap Connection (FHTC) by Augmentation of Kapaseria Water Supply Scheme ,SM/09276 |
Augmentation |
Haldia Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Junior Engineer,Sri Krishanu Mondal, JE/Haldia Electrical Sub-Division. |
03/11/2021 |
01/12/2021 |
31/12/2025 |
29/12/2025 |
11 |
909 |
340.42 |
167.18 |
60 |
49 |
| 26 |
Tamluk Division |
PURBA MEDINIPUR |
Chandipur |
Rejuvenation & Retrofitting of Ground Water Based Rashikachak PWSS to Accommodate FHTC in Chandipur Block under Tamluk Sub-Division of Tamluk Division in Purba Medinipur District.,SM/09277 |
Augmentation |
Tamluk Sadar Sub-Division |
Assistant Engineer |
Junior Engineer |
03/11/2021 |
02/12/2021 |
31/12/2025 |
29/12/2025 |
5 |
1,586 |
315.94 |
262.85 |
95 |
83 |
| 27 |
Tamluk Division |
PURBA MEDINIPUR |
Ramnagar - II |
Different Works for Providing Functional Household Tap Connection (FHTC) by Augmentation of Kalindi Water Supply Scheme.,SM/09278 |
Augmentation |
Digha Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Junior Engineer,Sri Ujjal Kumar Dey, JE/Haldia Electrical Sub-Division. |
03/11/2021 |
17/03/2022 |
31/12/2025 |
29/12/2025 |
13 |
3,059 |
678.53 |
486.36 |
70 |
72 |
| 28 |
Tamluk Division |
PURBA MEDINIPUR |
Moyna |
Rejuvenation & Retrofitting of Ground Water Based Paramanandapur PWSS to Accommodate FHTC in Moyna Block under Tamluk Sub-Division of Tamluk Division in Purba Medinipur District.,SM/09279 |
Augmentation |
Tamluk Sadar Sub-Division |
Assistant Engineer |
Junior Engineer |
03/11/2021 |
02/12/2021 |
31/12/2025 |
29/12/2025 |
6 |
2,139 |
366.62 |
349.09 |
95 |
95 |
| 29 |
Tamluk Division |
PURBA MEDINIPUR |
Panskura |
Rejuvenation & Retrofitting of Ground water Based Haur PWSS to Accommodate FHTC in Panskura Block Under Tamluk Division in Purba Medinipur District.,SM/09280 |
Augmentation |
Tamluk Sadar Sub-Division |
Assistant Engineer |
Junior Engineer |
03/11/2021 |
02/12/2021 |
31/12/2025 |
29/12/2025 |
7 |
2,013 |
445.45 |
231.26 |
96 |
52 |
| 30 |
Tamluk Division |
PURBA MEDINIPUR |
Mahisadal |
Different works for Providing Function Household Tap Connection (FHTC) by Augmentation of Rajarampur Water Supply Scheme.,SM/09281 |
Augmentation |
Haldia Sub-Division |
Assistant Engineer |
Junior Engineer |
03/11/2021 |
01/12/2021 |
31/03/2025 |
29/12/2025 |
13 |
2,920 |
681.09 |
597.79 |
90 |
88 |
| 31 |
Tamluk Division |
PURBA MEDINIPUR |
Tamluk |
Different Works for Providing Functional Household Tap Connection (FHTC) by Augmentation of Uttar Sonamui Water Supply Scheme.,SM/09282 |
Augmentation |
Tamluk Sadar Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Junior Engineer,Sri Raju Pramanik, JE/Haldia Electrical Sub-Division. |
03/11/2021 |
08/02/2022 |
31/12/2025 |
29/12/2025 |
27 |
4,747 |
890.90 |
691.40 |
70 |
78 |
| 32 |
Tamluk Division |
PURBA MEDINIPUR |
Mahisadal |
Different Works for Providing Functional Household Tap Connection (FHTC) by Augmentation of Rangibasan Water Supply Scheme.,SM/09283 |
Augmentation |
Haldia Sub-Division |
Assistant Engineer |
Junior Engineer |
03/11/2021 |
11/02/2022 |
31/03/2025 |
29/12/2025 |
18 |
3,478 |
686.91 |
478.06 |
50 |
70 |
| 33 |
Tamluk Division |
PURBA MEDINIPUR |
Sutahata |
Different works for Providing Functional Household Tap Connection (FHTC) by Augmentation of Dhenuka Water Supply Scheme ,SM/09284 |
Augmentation |
Haldia Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Junior Engineer,Sri Tanmoy Shee, JE/Haldia Electrical Sub-Division. |
03/11/2021 |
01/12/2021 |
31/03/2025 |
29/12/2025 |
14 |
2,879 |
739.47 |
662.67 |
80 |
90 |
| 34 |
Tamluk Division |
PURBA MEDINIPUR |
Panskura |
Rejuvenation & Retrofitting of Ground Water Based Gobindanagar PWSS to Accommodate FHTC in Panskura Block under Tamluk Sub-Division of Tamluk Division in Purba Medinipur District. (Zone - I & Zone- II),SM/09286 |
Augmentation |
Tamluk Sadar Sub-Division |
Assistant Engineer |
Junior Engineer |
03/11/2021 |
23/02/2022 |
31/12/2025 |
29/12/2025 |
13 |
4,335 |
764.17 |
661.27 |
90 |
87 |
| 35 |
Tamluk Division |
PURBA MEDINIPUR |
Contai - III |
Augmentation of Ground Water Based Piped Water Supply Scheme for Sapai,SM/09287 |
Augmentation |
Contai Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Junior Engineer,Sri Sukanta Mondal, JE/Haldia Electrical Sub-Division. |
03/11/2021 |
08/11/2021 |
31/12/2025 |
29/12/2025 |
17 |
986 |
349.47 |
276.43 |
98 |
79 |
| 36 |
Tamluk Division |
PURBA MEDINIPUR |
Contai - III |
Augmentation of Ground Water Based Piped Water Supply Scheme for Dhanghara,SM/09288 |
Augmentation |
Contai Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Junior Engineer,Sri Krishanu Mondal, JE/Haldia Electrical Sub-Division. |
03/11/2021 |
08/11/2021 |
31/03/2025 |
29/12/2025 |
16 |
3,398 |
850.34 |
559.76 |
90 |
66 |
| 37 |
Tamluk Division |
PURBA MEDINIPUR |
Deshopran |
Augmentation of Ground Water Based Piped Supply Scheme for Anurai.,SM/09334 |
Augmentation |
Contai Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Junior Engineer,Sri Sukanta Mondal, JE/Haldia Electrical Sub-Division. |
12/11/2021 |
15/11/2021 |
31/12/2025 |
29/12/2025 |
21 |
2,536 |
704.29 |
465.05 |
98 |
66 |
| 38 |
Tamluk Division |
PURBA MEDINIPUR |
Contai - I |
Augmentation of Ground Water Based Piped Supply Scheme for Majna,SM/09335 |
Augmentation |
Contai Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Junior Engineer,Sri Mrityunjoy Paria, JE/Haldia Electrical Sub-Division. |
12/11/2021 |
15/11/2021 |
31/12/2025 |
29/12/2025 |
15 |
2,501 |
556.85 |
372.89 |
98 |
67 |
| 39 |
Tamluk Division |
PURBA MEDINIPUR |
Haldia |
Augmentation of Ground Water Based Barbasudevpur PWSS to Accommodate FHTC in Haldia Block under Haldia Sub-Division of Tamluk Division in Purba Medinipur District. ,SM/09336 |
Augmentation |
Haldia Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Junior Engineer,Sri Tanmoy Shee, JE/Haldia Electrical Sub-Division. |
12/11/2021 |
08/02/2022 |
31/12/2025 |
29/12/2025 |
25 |
1,784 |
556.34 |
382.76 |
65 |
69 |
| 40 |
Tamluk Division |
PURBA MEDINIPUR |
Sutahata |
Augmentation of Ground Water Based Asadtalia PWSS to Accommodate FHTC in Sutahata Block under Haldia Sub-Division of Tamluk Division in Purba Medinipur District. ,SM/09337 |
Augmentation |
Haldia Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Junior Engineer,Sri Tanmoy Shee, JE/Haldia Electrical Sub-Division. |
12/11/2021 |
11/02/2022 |
31/03/2025 |
29/12/2025 |
20 |
1,862 |
529.85 |
406.33 |
69 |
77 |
| 41 |
Tamluk Division |
PURBA MEDINIPUR |
Sahid Matangini |
Different works for Providing Functional Household Tap Connection (FHTC) by Augmentation of Mohisda (Demarihat) Zone-II Water Supply Scheme. ,SM/09338 |
Augmentation |
Tamluk Sadar Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Junior Engineer,Sri Raju Pramanik, JE/Haldia Electrical Sub-Division. |
12/11/2021 |
02/12/2021 |
30/06/2025 |
29/12/2025 |
7 |
3,736 |
685.69 |
378.83 |
75 |
55 |
| 42 |
Tamluk Division |
PURBA MEDINIPUR |
Moyna |
Narikeldaha Piped Water Supply Scheme. ,SM/09342 |
New |
|
|
|
12/11/2021 |
30/11/2021 |
31/03/2025 |
29/12/2025 |
17 |
2,272 |
848.91 |
759.49 |
99 |
89 |
| 43 |
Tamluk Division |
PURBA MEDINIPUR |
Egra - I |
Augmentation of Ground Water Based Kasbagola PWSS to Accommodate FHTC in EGRA-I Block under Digha Sub-Division of Tamluk Division in Purba Medinipur District. ,SM/09402 |
Augmentation |
Digha Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Junior Engineer,Sri Mrityunjoy Paria, JE/Haldia Electrical Sub-Division. |
17/11/2021 |
11/02/2022 |
31/12/2025 |
29/12/2025 |
14 |
2,132 |
535.02 |
286.03 |
70 |
53 |
| 44 |
Tamluk Division |
PURBA MEDINIPUR |
Moyna |
Balance Work for Retrofitting to Accommodate FHTC (152 Nos.) and laying of left-out portion UPVC pipeline due to uncovered area of different nodal point of Dona Zone-II and its adjoining mouzas water supply scheme under JJM within Moyna Block under Tamluk,SM/09443 |
Retrofitting |
|
|
|
19/11/2021 |
18/07/2016 |
31/12/2025 |
29/12/2025 |
1 |
152 |
48.34 |
45.80 |
99 |
95 |
| 45 |
Tamluk Division |
PURBA MEDINIPUR |
Contai - III |
Augmentation of Ground Water Based Piped Water Supply Scheme for Talda,SM/09445 |
Augmentation |
Contai Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Junior Engineer,Sri Sukanta Mondal, JE/Haldia Electrical Sub-Division. |
19/11/2021 |
11/02/2022 |
31/12/2025 |
29/12/2025 |
28 |
3,171 |
822.22 |
560.08 |
80 |
68 |
| 46 |
Tamluk Division |
PURBA MEDINIPUR |
Potashpur - I |
Augmentation of Ground Water Based Piped Water Supply Scheme for Golaranji,SM/09447 |
Augmentation |
Contai Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Junior Engineer,Sri Sukanta Mondal, JE/Haldia Electrical Sub-Division. |
19/11/2021 |
14/01/2022 |
31/03/2025 |
29/12/2025 |
13 |
2,940 |
663.05 |
320.98 |
75 |
48 |
| 47 |
Tamluk Division |
PURBA MEDINIPUR |
Tamluk |
Different works for providing Functional Household Tap Connection (FHTC) by Augmentation of Bishnubar Water Supply Scheme,SM/09448 |
Augmentation |
Tamluk Sadar Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Junior Engineer,Sri Raju Pramanik, JE/Haldia Electrical Sub-Division. |
19/11/2021 |
21/03/2022 |
31/12/2025 |
29/12/2025 |
32 |
4,327 |
802.36 |
733.73 |
73 |
91 |
| 48 |
Tamluk Division |
PURBA MEDINIPUR |
Ramnagar - I |
Retrofitting to Accommodate FHTC under JJM in Gobra PWSS under Ramnagar-I Block. ,SM/09800 |
Retrofitting |
Digha Sub-Division |
Assistant Engineer |
Junior Engineer |
01/12/2021 |
16/01/2018 |
31/03/2025 |
29/12/2025 |
2 |
2,550 |
149.22 |
106.19 |
95 |
71 |
| 49 |
Tamluk Division |
PURBA MEDINIPUR |
Bhagawanpur - II |
Retrofitting to Accommodate FHTC under JJM in Arjunnagar PWSS under Bhagwanpur-II Block. ,SM/09801 |
Retrofitting |
|
|
|
01/12/2021 |
21/03/2022 |
31/12/2025 |
29/12/2025 |
3 |
2,862 |
160.98 |
144.09 |
98 |
90 |
| 50 |
Tamluk Division |
PURBA MEDINIPUR |
Sahid Matangini |
Retrofitting to Accommodate FHTC (2753) Nos. and laying of left-out portion UPVC pipe line due to uncovered area of this Zone at different nodal point under JJM in Uttar Dhalhara Zone-II of Sahid Matangini Block in this district of Purba Medinipur. ,SM/09802 |
Retrofitting |
|
|
|
01/12/2021 |
19/12/2018 |
31/12/2025 |
29/12/2025 |
3 |
2,753 |
164.09 |
90.90 |
95 |
55 |
| 51 |
Tamluk Division |
PURBA MEDINIPUR |
Egra - I |
Retrofitting to Accommodate FHTC under JJM in Nagua PWSS under Egra-I Block. ,SM/09804 |
Retrofitting |
Digha Sub-Division |
Assistant Engineer |
Junior Engineer |
01/12/2021 |
07/02/2018 |
31/03/2025 |
29/12/2025 |
3 |
2,783 |
166.66 |
115.23 |
80 |
69 |
| 52 |
Tamluk Division |
PURBA MEDINIPUR |
Nanda Kumar |
Augmentation of Ground Water Based Bargodagodar PWSS to Accommodate FHTC in Nandakumar Block under Tamluk Sub-Division of Tamluk Division in Purba Medinipur District.,SM/09913 |
Augmentation |
Tamluk Sadar Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Junior Engineer,Sri Tanmoy Shee, JE/Haldia Electrical Sub-Division. |
10/12/2021 |
02/12/2021 |
31/12/2025 |
29/12/2025 |
26 |
6,158 |
1,104.23 |
839.43 |
65 |
76 |
| 53 |
Tamluk Division |
PURBA MEDINIPUR |
Chandipur |
Rejuvenation & Retrofitting of Ground Water Based Kulbari PWSS to Accommodate FHTC in Chandipur Block Under Tamluk Sub-Division of Tamluk Division in Purba Medinipur District.,SM/09914 |
Augmentation |
Haldia Electrical Sub-Division |
Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Sri Krishanu Mondal, JE/Haldia Electrical Sub-Division. |
10/12/2021 |
02/12/2021 |
31/12/2025 |
29/12/2025 |
16 |
4,407 |
1,060.63 |
864.95 |
80 |
82 |
| 54 |
Tamluk Division |
PURBA MEDINIPUR |
Bhagawanpur - II |
Augmentation of Suadighi piped water supply scheme.,SM/09919 |
Augmentation |
Contai Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Junior Engineer,Sri Sukanta Mondal, JE/Haldia Electrical Sub-Division. |
10/12/2021 |
12/07/2022 |
31/12/2025 |
29/12/2025 |
42 |
6,915 |
2,222.11 |
1,179.60 |
50 |
53 |
| 55 |
Tamluk Division |
PURBA MEDINIPUR |
Bhagawanpur - II |
Augmentation of Madhakhali piped water supply scheme.,SM/09920 |
Augmentation |
Contai Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Junior Engineer,Sri Sukanta Mondal, JE/Haldia Electrical Sub-Division. |
10/12/2021 |
20/05/2022 |
31/03/2025 |
29/12/2025 |
37 |
7,098 |
2,333.22 |
1,486.18 |
74 |
64 |
| 56 |
Tamluk Division |
PURBA MEDINIPUR |
Tamluk |
Different Works for providing Functional Household Tap Connection (FHTC) by Augmentation of Chapbasan Water Supply Scheme.,SM/09977 |
Augmentation |
Tamluk Sadar Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Junior Engineer,Sri Raju Pramanik, JE/Haldia Electrical Sub-Division. |
17/12/2021 |
01/12/2021 |
31/12/2025 |
29/12/2025 |
36 |
7,229 |
1,187.36 |
714.52 |
80 |
60 |
| 57 |
Tamluk Division |
PURBA MEDINIPUR |
Mahisadal |
Different works for Providing Functional Household Tap Connection (FHTC) by Augmentation of Gopalpur Water Supply Scheme. ,SM/10030 |
Augmentation |
Haldia Sub-Division |
Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Junior Engineer,Sri Krishanu Mondal, JE/Haldia Electrical Sub-Division. |
19/01/2022 |
02/12/2021 |
31/03/2025 |
29/12/2025 |
19 |
707 |
1,321.60 |
1,038.59 |
66 |
79 |
| 58 |
Tamluk Division |
PURBA MEDINIPUR |
Sahid Matangini |
Different works for Providing Functional Household Tap Connection (FHTC) by Augmentation of Mohisda (Demarihat) Zone-I Water Supply Scheme. ,SM/10031 |
Augmentation |
Tamluk Sadar Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Junior Engineer,Sri Raju Pramanik, JE/Haldia Electrical Sub-Division. |
19/01/2022 |
02/12/2021 |
31/12/2025 |
29/12/2025 |
19 |
5,167 |
1,041.15 |
790.43 |
70 |
76 |
| 59 |
Tamluk Division |
PURBA MEDINIPUR |
Deshopran |
Augmentation of Ground Water Based Piped Water Supply Scheme for Baghaput.,SM/10072 |
Augmentation |
Contai Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Sri Mrityunjoy Paria, JE/Haldia Electrical Sub-Division. |
27/01/2022 |
14/01/2022 |
31/12/2025 |
29/12/2025 |
9 |
1,833 |
581.76 |
306.15 |
50 |
53 |
| 60 |
Tamluk Division |
PURBA MEDINIPUR |
Sahid Matangini |
Different woks for Providing Functional Household Tap Connection (FHTC) by Augmentation of Kanktya Water Supply Scheme. ,SM/10120 |
Augmentation |
Tamluk Sadar Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Junior Engineer,Sri Raju Pramanik, JE/Haldia Electrical Sub-Division. |
08/02/2022 |
27/06/2022 |
31/12/2025 |
29/12/2025 |
16 |
7,239 |
1,515.48 |
1,112.83 |
70 |
73 |
| 61 |
Tamluk Division |
PURBA MEDINIPUR |
Nanda Kumar |
Augmentation of Ground Water Based Thenkuachak PWSS to Accommodate FHTC in Nandakumar & Moyna Block under Tamluk Sub-Division of Tamluk Division in Purba Medinipur District. ,SM/10121 |
Augmentation |
Haldia Electrical Sub-Division |
Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Junior Engineer,Sri Krishanu Mondal, JE/Haldia Electrical Sub-Division.,Sri Tanmoy Shee, JE/Haldia Electrical Sub-Division. |
08/02/2022 |
30/12/2021 |
31/03/2025 |
29/12/2025 |
34 |
9,661 |
2,314.83 |
1,636.65 |
70 |
71 |
| 62 |
Tamluk Division |
PURBA MEDINIPUR |
Nanda Kumar |
Different works for providing Functional Household Tap Connection (FHTC) by Augmentation of Baichberia Water Supply Scheme,SM/10122 |
Augmentation |
Tamluk Sadar Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Junior Engineer,Sri Tanmoy Shee, JE/Haldia Electrical Sub-Division. |
08/02/2022 |
28/02/2022 |
31/12/2025 |
29/12/2025 |
26 |
6,387 |
1,492.39 |
1,111.65 |
75 |
74 |
| 63 |
Tamluk Division |
PURBA MEDINIPUR |
Bhagawanpur - I |
Augmentation of Ground Water Based Bhagwanpur PWSS to Accommodate FHTC in Bhagwanpur-I Block under Contai Sub-Division of Tamluk Division in Purba Medinipur District. (Zone-I & Zone-II),SM/10125 |
Augmentation |
Contai Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Junior Engineer,Sri Sukanta Mondal, JE/Haldia Electrical Sub-Division. |
08/02/2022 |
27/06/2022 |
31/03/2025 |
29/12/2025 |
33 |
9,676 |
2,077.89 |
1,410.88 |
95 |
68 |
| 64 |
Tamluk Division |
PURBA MEDINIPUR |
Deshopran |
Augmentation of Ground Water Based Piped Water Supply Scheme for Chandibhetti ,SM/10126 |
Augmentation |
Haldia Electrical Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Junior Engineer,Sri Mrityunjoy Paria, JE/Haldia Electrical Sub-Division. |
08/02/2022 |
14/01/2022 |
31/12/2025 |
29/12/2025 |
13 |
3,753 |
1,145.17 |
655.27 |
81 |
57 |
| 65 |
Tamluk Division |
PURBA MEDINIPUR |
Contai - I |
Augmentation of Ground Water Based Piped Water Supply Scheme for Junbani ,SM/10127 |
Augmentation |
Contai Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Junior Engineer,Sri Mrityunjoy Paria, JE/Haldia Electrical Sub-Division. |
08/02/2022 |
14/01/2022 |
31/12/2025 |
29/12/2025 |
14 |
5,256 |
1,418.64 |
822.76 |
85 |
58 |
| 66 |
Tamluk Division |
PURBA MEDINIPUR |
Contai - III |
Augmentation of Ground Water Based Piped Water Supply Scheme for Kumirda,SM/10128 |
Augmentation |
Contai Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Junior Engineer,Sri Mrityunjoy Paria, JE/Haldia Electrical Sub-Division. |
08/02/2022 |
14/01/2022 |
31/12/2025 |
29/12/2025 |
16 |
5,364 |
1,634.61 |
622.30 |
53 |
38 |
| 67 |
Tamluk Division |
PURBA MEDINIPUR |
Contai - III |
Augmentation of Ground Water Based Piped Water Supply Scheme for Durmut,SM/10323 |
Augmentation |
Haldia Electrical Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Junior Engineer,Sri Mrityunjoy Paria, JE/Haldia Electrical Sub-Division.,Sri Sukanta Mondal, JE/Haldia Electrical Sub-Division. |
07/03/2022 |
14/01/2022 |
31/12/2025 |
29/12/2025 |
30 |
3,895 |
1,166.79 |
715.07 |
86 |
61 |
| 68 |
Tamluk Division |
PURBA MEDINIPUR |
Contai - III |
Augmentation of Ground Water Based Piped Water Supply Scheme for Shankarpur,SM/10342 |
Augmentation |
Contai Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Junior Engineer,Sri Mrityunjoy Paria, JE/Haldia Electrical Sub-Division.,Sri Sukanta Mondal, JE/Haldia Electrical Sub-Division. |
14/03/2022 |
14/03/2022 |
31/03/2025 |
29/12/2025 |
14 |
2,162 |
800.14 |
414.12 |
89 |
52 |
| 69 |
Tamluk Division |
PURBA MEDINIPUR |
Khejuri - I |
Augmentation of Ground Water Based Piped Water Supply Scheme for Kamarda,SM/10344 |
Augmentation |
Contai Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Junior Engineer,Sri Tanmoy Shee, JE/Haldia Electrical Sub-Division. |
16/03/2022 |
23/08/2022 |
31/03/2025 |
29/12/2025 |
12 |
3,155 |
952.00 |
492.39 |
70 |
52 |
| 70 |
Tamluk Division |
PURBA MEDINIPUR |
Mahisadal |
Retrofitting to accommodate FHTC (410) Nos. under JJM in Keshabpur Jalpai PWSS (Balance Part-Phase-II) under Mahishadal Dev. Block. ,SM/10346 |
Retrofitting |
|
|
|
16/03/2022 |
18/02/2016 |
30/09/2025 |
29/12/2025 |
1 |
410 |
26.17 |
19.06 |
95 |
73 |
| 71 |
Tamluk Division |
PURBA MEDINIPUR |
Haldia |
Augmentation of Ground Water Based Monoharpur PWSS to Accommodate FHTC in Haldia Block under Haldia Sub-Division of Tamluk Division in Purba Medinipur.,SM/10393 |
Augmentation |
Haldia Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Junior Engineer,Sri Tanmoy Shee, JE/Haldia Electrical Sub-Division. |
29/03/2022 |
17/02/2023 |
31/03/2025 |
29/12/2025 |
9 |
2,729 |
787.03 |
550.65 |
95 |
70 |
| 72 |
Tamluk Division |
PURBA MEDINIPUR |
Ramnagar - I |
Retrofitting to accommodate FHTC under JJM in MUKUNDAPUR PWSS under Ramnagar-I Block,SM/10432 |
Retrofitting |
Digha Sub-Division |
Assistant Engineer |
Junior Engineer |
12/04/2022 |
21/12/2018 |
31/12/2025 |
29/12/2025 |
2 |
2,488 |
126.97 |
0.00 |
80 |
0 |
| 73 |
Tamluk Division |
PURBA MEDINIPUR |
Deshopran |
Retrofitting to accommodate FHTC under JJM in Baharchandberya PWSS under Contai-II Block (Phase-II),SM/10433 |
Retrofitting |
Contai Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Junior Engineer,Sri Mrityunjoy Paria, JE/Haldia Electrical Sub-Division. |
12/04/2022 |
03/08/2022 |
31/03/2025 |
29/12/2025 |
6 |
304 |
178.42 |
72.20 |
70 |
40 |
| 74 |
Tamluk Division |
PURBA MEDINIPUR |
Khejuri - I |
Ground Water Based Mukutshila PWSS to accommodate FHTC within Khejuri-I Block under Contai Sub-Division of Tamluk Division in Purba Meinipur District Zone-II (Phase-2),SM/10588 |
Augmentation |
Contai Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Junior Engineer,Sri Krishanu Mondal, JE/Haldia Electrical Sub-Division. |
18/04/2022 |
08/08/2022 |
31/12/2025 |
29/12/2025 |
20 |
7,796 |
999.73 |
706.69 |
60 |
71 |
| 75 |
Tamluk Division |
PURBA MEDINIPUR |
Khejuri - I |
Ground Water Based Mukutshila PWSS to accommodate FHTC within Khejuri-I Block under Contai Sub-Division of Tamluk Division in Purba Meinipur District Zone-II (Phase-I),SM/10589 |
Augmentation |
Contai Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Junior Engineer,Sri Mrityunjoy Paria, JE/Haldia Electrical Sub-Division. |
18/04/2022 |
08/08/2022 |
31/12/2025 |
29/12/2025 |
30 |
0 |
980.60 |
503.58 |
35 |
51 |
| 76 |
Tamluk Division |
PURBA MEDINIPUR |
Khejuri - I |
Ground Water Based Mukutshila PWSS to accommodate FHTC within Khejuri-I Block under Contai Sub-Division of Tamluk Division in Purba Meinipur District Zone-I (Phase-2),SM/10590 |
Augmentation |
Contai Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Junior Engineer,Sri Krishanu Mondal, JE/Haldia Electrical Sub-Division. |
18/04/2022 |
08/08/2022 |
31/12/2025 |
29/12/2025 |
6 |
4,830 |
585.68 |
337.98 |
42 |
58 |
| 77 |
Tamluk Division |
PURBA MEDINIPUR |
Khejuri - I |
Ground Water Based Mukutshila PWSS to accommodate FHTC within Khejuri-I Block under Contai Sub-Division of Tamluk Division in Purba Meinipur District Zone-I (Phase-I),SM/10591 |
Augmentation |
Contai Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Junior Engineer,Sri Mrityunjoy Paria, JE/Haldia Electrical Sub-Division. |
18/04/2022 |
08/08/2022 |
31/12/2025 |
29/12/2025 |
12 |
0 |
703.33 |
245.97 |
40 |
35 |
| 78 |
Tamluk Division |
PURBA MEDINIPUR |
Khejuri - II |
Ground Water Based Khejuri PWSS to accommodate FHTC within Khejuri-II Block under Contai Sub-Division of Tamluk Division in Purba Meinipur District Zone-I (Phase-I),SM/10592 |
Augmentation |
Haldia Electrical Sub-Division |
Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Sri Mrityunjoy Paria, JE/Haldia Electrical Sub-Division. |
18/04/2022 |
12/07/2022 |
31/03/2025 |
29/12/2025 |
14 |
0 |
903.71 |
508.76 |
45 |
56 |
| 79 |
Tamluk Division |
PURBA MEDINIPUR |
Sutahata |
Ground Water Based CHAITANYAPUR Zone-I PWSS to Accommodate FHTC in Sutahata Block Under Haldia Sub-Division of Tamluk Division in Purba Medinipur District. ,SM/10593 |
Augmentation |
Haldia Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Junior Engineer,Sri Tanmoy Shee, JE/Haldia Electrical Sub-Division. |
18/04/2022 |
04/07/2022 |
31/12/2025 |
29/12/2025 |
41 |
4,937 |
995.98 |
759.40 |
80 |
76 |
| 80 |
Tamluk Division |
PURBA MEDINIPUR |
Egra - II |
Ground Water Based Piped Water Supply Scheme for Madhabpur Zone-II,SM/10594 |
Augmentation |
Digha Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Junior Engineer,Sri Sukanta Mondal, JE/Haldia Electrical Sub-Division. |
18/04/2022 |
14/10/2022 |
31/12/2025 |
29/12/2025 |
10 |
2,508 |
819.79 |
281.18 |
22 |
34 |
| 81 |
Tamluk Division |
PURBA MEDINIPUR |
Khejuri - II |
Ground Water Based Khejuri PWSS to accommodate FHTC within Khejuri-II Block under Contai Sub-Division of Tamluk Division in Purba Meinipur District Zone-I (Phase-2),SM/10647 |
Augmentation |
Haldia Electrical Sub-Division |
Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Sri Mrityunjoy Paria, JE/Haldia Electrical Sub-Division. |
22/04/2022 |
12/07/2022 |
31/12/2025 |
29/12/2025 |
27 |
5,157 |
539.62 |
527.18 |
98 |
98 |
| 82 |
Tamluk Division |
PURBA MEDINIPUR |
Khejuri - II |
Ground Water Based Khejuri PWSS to accommodate FHTC within Khejuri-II Block under Contai Sub-Division of Tamluk Division in Purba Meinipur District Zone-II (Phase-I),SM/10664 |
Augmentation |
Haldia Electrical Sub-Division |
Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Sri Mrityunjoy Paria, JE/Haldia Electrical Sub-Division. |
22/04/2022 |
16/08/2022 |
31/03/2025 |
29/12/2025 |
11 |
0 |
599.83 |
93.83 |
50 |
16 |
| 83 |
Tamluk Division |
PURBA MEDINIPUR |
Tamluk |
Augmentation of Ground Water Based Simulia PWSS to Accommodate FHTC in Tamluk Block under Tamluk Sub-Division of Tamluk Division in Purba Medinipur District.,SM/10681 |
Augmentation |
Haldia Electrical Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Junior Engineer,Sri Raju Pramanik, JE/Haldia Electrical Sub-Division. |
06/05/2022 |
01/12/2022 |
31/12/2025 |
29/12/2025 |
13 |
6,101 |
1,073.49 |
573.44 |
55 |
53 |
| 84 |
Tamluk Division |
PURBA MEDINIPUR |
Sutahata |
Different works for providing Functional Household Tap Connection (FHTC) by Augmentation of Tabakhali Water Supply Scheme.,SM/10683 |
Augmentation |
Haldia Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Junior Engineer,Sri Tanmoy Shee, JE/Haldia Electrical Sub-Division. |
06/05/2022 |
01/07/2022 |
31/03/2025 |
29/12/2025 |
11 |
5,528 |
1,126.18 |
851.65 |
50 |
76 |
| 85 |
Tamluk Division |
PURBA MEDINIPUR |
Nanda Kumar |
Augmentation of Ground Water Based Khejurberia PWSS to accommodate FHTC in Nandakumar Block under Tamluk Sub Division of Tamluk Division in Purba Medinipur District. ,SM/10684 |
Augmentation |
Haldia Electrical Sub-Division |
Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Junior Engineer,Sri Tanmoy Shee, JE/Haldia Electrical Sub-Division. |
06/05/2022 |
12/09/2022 |
31/12/2025 |
29/12/2025 |
21 |
8,284 |
1,309.53 |
1,162.70 |
78 |
89 |
| 86 |
Tamluk Division |
PURBA MEDINIPUR |
Bhagawanpur - I |
GROUND WATER BASED MINI PIPED WATER SUPPLY SCHEMES (MAXIMUM 100 HOUSEHOLD) FOR BHAGWANPUR-I & BHAGWANPUR-II BLOCK OF PURBA MEDINIPUR OF WEST BENGAL.,SM/10689 |
New |
|
|
|
12/05/2022 |
09/03/2023 |
31/12/2025 |
29/12/2025 |
3 |
2,443 |
963.00 |
859.82 |
50 |
89 |
| 87 |
Tamluk Division |
PURBA MEDINIPUR |
Mahisadal |
Augmentation of Ground water Based Betkundu Water Supply Scheme ,SM/11206 |
Augmentation |
Haldia Sub-Division |
Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Junior Engineer,Sri Krishanu Mondal, JE/Haldia Electrical Sub-Division. |
08/06/2022 |
14/10/2022 |
31/03/2025 |
29/12/2025 |
10 |
5,997 |
1,317.43 |
938.48 |
60 |
71 |
| 88 |
Tamluk Division |
PURBA MEDINIPUR |
Mahisadal |
Augmentation of Ground Water Based Natshal Lakshya Zone-II Phase-II PWSS to Accommodate FHTC in Mahishadal Block under Haldia Sub-Division of Tamluk Division in Purba Medinipur District. ,SM/11470 |
Augmentation |
Haldia Sub-Division |
Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Junior Engineer,Sri Krishanu Mondal, JE/Haldia Electrical Sub-Division. |
14/07/2022 |
12/09/2022 |
31/12/2025 |
29/12/2025 |
7 |
8,505 |
869.93 |
672.93 |
47 |
77 |
| 89 |
Tamluk Division |
PURBA MEDINIPUR |
Mahisadal |
Augmentation of Ground Water Based Natshal Lakshya Zone-II Phase-I PWSS to Accommodate FHTC in Mahishadal Block under Haldia Sub-Division of Tamluk Division in Purba Medinipur District. ,SM/11471 |
Augmentation |
Haldia Sub-Division |
Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Junior Engineer,Sri Krishanu Mondal, JE/Haldia Electrical Sub-Division. |
14/07/2022 |
30/01/2023 |
31/12/2025 |
29/12/2025 |
9 |
0 |
745.37 |
303.41 |
35 |
41 |
| 90 |
Tamluk Division |
PURBA MEDINIPUR |
Mahisadal |
Augmentation of Ground Water Based Natshal Lakshya Zone-I Phase-II PWSS to Accommodate FHTC in Mahishadal Block under Haldia Sub-Division of Tamluk Division in Purba Medinipur District. ,SM/11472 |
Augmentation |
Haldia Sub-Division |
Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Junior Engineer,Sri Krishanu Mondal, JE/Haldia Electrical Sub-Division. |
14/07/2022 |
12/09/2022 |
31/12/2025 |
29/12/2025 |
9 |
8,206 |
834.19 |
594.96 |
65 |
71 |
| 91 |
Tamluk Division |
PURBA MEDINIPUR |
Mahisadal |
Augmentation of Ground Water Based Natshal Lakshya Zone-I Phase-I PWSS to Accommodate FHTC in Mahishadal Block under Haldia Sub-Division of Tamluk Division in Purba Medinipur District. ,SM/11473 |
Augmentation |
Haldia Sub-Division |
Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Junior Engineer,Sri Krishanu Mondal, JE/Haldia Electrical Sub-Division. |
14/07/2022 |
22/11/2022 |
31/12/2025 |
29/12/2025 |
16 |
0 |
873.48 |
247.48 |
50 |
28 |
| 92 |
Tamluk Division |
PURBA MEDINIPUR |
Tamluk |
Augmentation of Ground Water Based Anantapur Zone-I PWSS to Accommodate FHTC in Tamluk Block under Tamluk Sub-Division of Tamluk Division in Purba Medinipur District.,SM/11474 |
Augmentation |
Haldia Electrical Sub-Division |
Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Junior Engineer,Sri Raju Pramanik, JE/Haldia Electrical Sub-Division. |
14/07/2022 |
24/11/2022 |
31/03/2025 |
29/12/2025 |
14 |
6,217 |
997.01 |
539.08 |
70 |
54 |
| 93 |
Tamluk Division |
PURBA MEDINIPUR |
Haldia |
Augmentation of Ground Water Based Solat PWSS to Accommodate FHTC in Haldia Block under Haldia Sub-Division in Purba Medinipur District. ,SM/11552 |
Augmentation |
Haldia Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Junior Engineer,Sri Tanmoy Shee, JE/Haldia Electrical Sub-Division. |
22/07/2022 |
29/08/2022 |
31/12/2025 |
29/12/2025 |
13 |
2,646 |
617.59 |
351.49 |
50 |
57 |
| 94 |
Tamluk Division |
PURBA MEDINIPUR |
Sutahata |
Augmentation of Ground Water Based CHAITANYAPUR Zone-II PWSS to Accommodate FHTC in Sutahata Block under Haldia Sub-Division of Tamluk Division in Purba Medinipur District.,SM/11553 |
Augmentation |
Haldia Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Junior Engineer,Sri Tanmoy Shee, JE/Haldia Electrical Sub-Division. |
22/07/2022 |
12/09/2022 |
31/12/2025 |
29/12/2025 |
13 |
4,374 |
944.76 |
446.04 |
55 |
47 |
| 95 |
Tamluk Division |
PURBA MEDINIPUR |
Khejuri - II |
Augmentation of Ground Water Based Shillaberia Jhanka PWSS to Accommodate FHTC in Khejuri-II Block under Contai Sub-Division of Tamluk Division in Purba Medinipur District Zone-II (Phase-2) ,SM/11554 |
Augmentation |
Contai Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Junior Engineer,Sri Krishanu Mondal, JE/Haldia Electrical Sub-Division. |
22/07/2022 |
02/11/2022 |
31/12/2025 |
29/12/2025 |
10 |
5,512 |
742.35 |
490.36 |
65 |
66 |
| 96 |
Tamluk Division |
PURBA MEDINIPUR |
Potashpur - II |
Sinking of Boosting Tube Well and Allied Works for Argoal PWSS under Contai Sub-Division of Tamluk Division, PHE Dte. within the Purba Medinipur District. ,SM/11612 |
Augmentation |
Contai Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Junior Engineer,Sri Sukanta Mondal, JE/Haldia Electrical Sub-Division. |
26/07/2022 |
18/08/2022 |
31/03/2025 |
29/12/2025 |
6 |
0 |
69.80 |
38.30 |
28 |
55 |
| 97 |
Tamluk Division |
PURBA MEDINIPUR |
Contai - III |
Sinking of Boosting Tube Well and Allied Works to Accommodate FHTC under JJM in Kanaidighi PWSS under Contai-III Block. ,SM/11613 |
Augmentation |
Contai Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Junior Engineer,Sri Sukanta Mondal, JE/Haldia Electrical Sub-Division. |
26/07/2022 |
18/08/2022 |
31/12/2025 |
29/12/2025 |
3 |
0 |
68.66 |
0.00 |
35 |
0 |
| 98 |
Tamluk Division |
PURBA MEDINIPUR |
Contai - III |
Ground Water Based Contai Saline Area Zone-I PWSS to Accommodate FHTC in Contai-I & III Block under Contai Sub-Division of Tamluk Division in Purba Medinipur District (Phase-A).,SM/11615 |
Augmentation |
Contai Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Junior Engineer,Sri Mrityunjoy Paria, JE/Haldia Electrical Sub-Division. |
26/07/2022 |
05/01/2023 |
31/12/2025 |
29/12/2025 |
10 |
3,857 |
915.35 |
201.79 |
35 |
22 |
| 99 |
Tamluk Division |
PURBA MEDINIPUR |
Khejuri - II |
Augmentation of Ground Water Based Shillaberia Jhanka PWSS to Accommodate FHTC in Khejuri-II Block under Contai Sub-Division of Tamluk Division in Purba Medinipur District Zone-II (Phase-1),SM/11616 |
Augmentation |
Contai Sub-Division |
Assistant Engineer |
Junior Engineer |
26/07/2022 |
02/11/2022 |
31/12/2025 |
29/12/2025 |
6 |
0 |
838.08 |
711.24 |
82 |
85 |
| 100 |
Tamluk Division |
PURBA MEDINIPUR |
Khejuri - II |
Augmentation of Ground Water Based Shillaberia Jhanka PWSS to Accommodate FHTC in Khejuri-II Block under Contai Sub-Division of Tamluk Division in Purba Medinipur District Zone-I (Phase-1),SM/11617 |
Augmentation |
Contai Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Junior Engineer,Sri Krishanu Mondal, JE/Haldia Electrical Sub-Division. |
26/07/2022 |
02/11/2022 |
31/12/2025 |
29/12/2025 |
11 |
6,291 |
843.08 |
415.97 |
70 |
49 |
| 101 |
Tamluk Division |
PURBA MEDINIPUR |
Khejuri - II |
Augmentation of Ground Water Based Shillaberia Jhanka PWSS to Accommodate FHTC in Khejuri-II Block under Contai Sub-Division of Tamluk Division in Purba Medinipur District Zone-I (Phase-2) ,SM/11618 |
Augmentation |
Contai Sub-Division |
Assistant Engineer |
Junior Engineer |
26/07/2022 |
02/11/2022 |
31/12/2025 |
29/12/2025 |
3 |
6,291 |
806.74 |
788.49 |
85 |
98 |
| 102 |
Tamluk Division |
PURBA MEDINIPUR |
|
Annual Procurement of Chemicals, Consumables, Glassware & A.M.C. of Computers of Different Water Testing Laboratories under Tamluk Division, PHE Dte. ,SM/11710 |
Support |
Tamluk Sadar Sub-Division |
Assistant Engineer |
Junior Engineer |
03/08/2022 |
02/11/2022 |
31/03/2024 |
05/10/2023 |
9 |
0 |
146.89 |
142.34 |
35 |
97 |
| 103 |
Tamluk Division |
PURBA MEDINIPUR |
|
Operation charges of PHED & NGO Managed Laboratories related to Water Quality Monitoring & Surveillance under Jal Jeevan Mission. ,SM/11816 |
Support |
Tamluk Sadar Sub-Division |
Assistant Engineer |
Junior Engineer |
16/08/2022 |
30/12/2022 |
31/03/2024 |
05/10/2023 |
35 |
0 |
89.61 |
83.84 |
30 |
94 |
| 104 |
Tamluk Division |
PURBA MEDINIPUR |
Contai - III |
Replacement Tube Well of 2nd Tube Well for Paschimbetya Water Supply Scheme under Contai Sub-Division of Tamluk Division, PHE Dte. within Purba Medinipur District. ,SM/11859 |
Augmentation |
Contai Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Junior Engineer,Sri Sukanta Mondal, JE/Haldia Electrical Sub-Division. |
17/08/2022 |
18/08/2022 |
31/12/2025 |
29/12/2025 |
5 |
0 |
37.95 |
9.47 |
15 |
25 |
| 105 |
Tamluk Division |
PURBA MEDINIPUR |
Contai - I |
Replacement Tube Well of 1st Tube Well & 1 (One) No. Boosting Tube Well for Damudarpur Water Supply Scheme under Contai Sub-Division of Tamluk Division, PHE Dte. within Purba Medinipur District.,SM/11860 |
Augmentation |
Contai Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Junior Engineer,Sri Mrityunjoy Paria, JE/Haldia Electrical Sub-Division. |
17/08/2022 |
18/08/2022 |
31/12/2025 |
29/12/2025 |
5 |
0 |
106.95 |
44.03 |
22 |
41 |
| 106 |
Tamluk Division |
PURBA MEDINIPUR |
Deshopran |
Replacement Tube Well for 2nd Tube Well for Baharchandberya Water Supply Scheme under Contai Sub-Division of Tamluk Division, PHE Dte. within Purba Medinipur District. ,SM/11861 |
Augmentation |
Contai Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Junior Engineer,Sri Mrityunjoy Paria, JE/Haldia Electrical Sub-Division. |
17/08/2022 |
18/08/2022 |
31/12/2025 |
29/12/2025 |
5 |
0 |
43.42 |
28.25 |
90 |
65 |
| 107 |
Tamluk Division |
PURBA MEDINIPUR |
Deshopran |
Replacement Tube Well of 1st Tube Well (Head Work) & 1 (One) No. Boosting Tube Well for Barasubarnanagar Water Supply Scheme for Deshapran (Contai-II) Block under Contai Sub-Division of Tamluk Division, PHE Dte. within Purba Medinipur District. ,SM/11862 |
Augmentation |
Contai Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Junior Engineer,Sri Mrityunjoy Paria, JE/Haldia Electrical Sub-Division. |
17/08/2022 |
18/08/2022 |
31/12/2025 |
29/12/2025 |
8 |
0 |
69.86 |
60.60 |
74 |
87 |
| 108 |
Tamluk Division |
PURBA MEDINIPUR |
Tamluk |
HARASHANKAR AND ITS ADJOINING MOUJAS PWSS,SM/11881 |
New |
Tamluk Sadar Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Junior Engineer,Sri Raju Pramanik, JE/Haldia Electrical Sub-Division. |
17/08/2022 |
16/05/2023 |
31/03/2025 |
29/12/2025 |
11 |
2,526 |
595.37 |
293.65 |
70 |
49 |
| 109 |
Tamluk Division |
PURBA MEDINIPUR |
Tamluk |
KURPAI AND ADJOINING MOUJAS PWSS,SM/11882 |
New |
Tamluk Sadar Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Junior Engineer,Sri Raju Pramanik, JE/Haldia Electrical Sub-Division. |
17/08/2022 |
04/05/2023 |
31/12/2025 |
29/12/2025 |
6 |
1,684 |
498.52 |
85.13 |
45 |
17 |
| 110 |
Tamluk Division |
PURBA MEDINIPUR |
Tamluk |
NILKANTHIA AND ITS ADJOINING MOUJAS PWSS,SM/11883 |
New |
Tamluk Sadar Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Junior Engineer,Sri Raju Pramanik, JE/Haldia Electrical Sub-Division. |
17/08/2022 |
28/04/2023 |
31/12/2025 |
29/12/2025 |
8 |
1,643 |
428.89 |
137.27 |
40 |
32 |
| 111 |
Tamluk Division |
PURBA MEDINIPUR |
Sahid Matangini |
BARNAN AND ITS ADJOINING MOUJAS PWSS,SM/11884 |
New |
Tamluk Sadar Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Junior Engineer,Sri Raju Pramanik, JE/Haldia Electrical Sub-Division. |
17/08/2022 |
12/07/2023 |
31/12/2025 |
29/12/2025 |
7 |
0 |
404.59 |
94.47 |
20 |
23 |
| 112 |
Tamluk Division |
PURBA MEDINIPUR |
Tamluk |
MAMUDPUR AND IT'S ADJOINING MOUJAS PWSS,SM/11885 |
New |
Tamluk Sadar Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Junior Engineer,Sri Raju Pramanik, JE/Haldia Electrical Sub-Division. |
17/08/2022 |
08/06/2023 |
31/12/2025 |
29/12/2025 |
5 |
1,306 |
410.86 |
110.61 |
50 |
27 |
| 113 |
Tamluk Division |
PURBA MEDINIPUR |
Tamluk |
PUTPUTIA PWSS,SM/11886 |
New |
Tamluk Sadar Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Junior Engineer,Sri Raju Pramanik, JE/Haldia Electrical Sub-Division. |
17/08/2022 |
10/04/2023 |
31/12/2025 |
29/12/2025 |
4 |
1,670 |
581.53 |
287.21 |
65 |
49 |
| 114 |
Tamluk Division |
PURBA MEDINIPUR |
Contai - I |
1 (One) No. Boosting Tube Well for Uttar Khasda Water Supply Scheme of Contai-I Block under Contai Sub-Division of Tamluk Division, PHE Dte. within with in the Purba Medinipur District. ,SM/11887 |
Augmentation |
Contai Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Junior Engineer,Sri Mrityunjoy Paria, JE/Haldia Electrical Sub-Division. |
17/08/2022 |
10/05/2023 |
31/12/2025 |
29/12/2025 |
5 |
0 |
57.27 |
37.18 |
35 |
65 |
| 115 |
Tamluk Division |
PURBA MEDINIPUR |
Deshopran |
1 (One) No. Boosting Tube Well for Amtalia Water Supply Scheme of Deshapran (Contai-II) Block under Contai Sub-Division of Tamluk Division, PHE Dte. within the Purba Medinipur District.,SM/11896 |
Augmentation |
Contai Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Junior Engineer,Sri Mrityunjoy Paria, JE/Haldia Electrical Sub-Division. |
18/08/2022 |
12/07/2023 |
31/12/2025 |
29/12/2025 |
3 |
0 |
62.49 |
9.66 |
35 |
15 |
| 116 |
Tamluk Division |
PURBA MEDINIPUR |
Nanda Kumar |
Augmentation of Ground Water based Jalpai Water Supply Scheme. ,SM/11920 |
Augmentation |
Tamluk Sadar Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Junior Engineer,Sri Tanmoy Shee, JE/Haldia Electrical Sub-Division. |
22/08/2022 |
29/08/2022 |
31/12/2025 |
29/12/2025 |
37 |
7,890 |
2,009.45 |
1,259.41 |
60 |
63 |
| 117 |
Tamluk Division |
PURBA MEDINIPUR |
Sahid Matangini |
KHARUI AND ADJOINING MOUZAS PWSS,SM/11945 |
New |
Tamluk Sadar Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Junior Engineer,Sri Raju Pramanik, JE/Haldia Electrical Sub-Division. |
24/08/2022 |
12/07/2023 |
31/12/2025 |
29/12/2025 |
7 |
2,574 |
637.14 |
253.99 |
75 |
40 |
| 118 |
Tamluk Division |
PURBA MEDINIPUR |
Tamluk |
MIRIKPUR AND ITS ADJOINING MOUJAS PWSS,SM/11946 |
New |
Tamluk Sadar Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Junior Engineer,Sri Raju Pramanik, JE/Haldia Electrical Sub-Division. |
24/08/2022 |
02/05/2023 |
31/12/2025 |
29/12/2025 |
5 |
4,142 |
984.88 |
64.78 |
55 |
7 |
| 119 |
Tamluk Division |
PURBA MEDINIPUR |
Tamluk |
HARASHANKAR KHAMARCHAK AND ITS ADJOINING MOUJAS PWSS,SM/11947 |
New |
Tamluk Sadar Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Junior Engineer,Sri Raju Pramanik, JE/Haldia Electrical Sub-Division. |
24/08/2022 |
01/06/2023 |
31/12/2025 |
29/12/2025 |
9 |
3,857 |
565.75 |
255.22 |
25 |
45 |
| 120 |
Tamluk Division |
PURBA MEDINIPUR |
Khejuri - II |
Ground Water Based Khejuri PWSS to accommodate FHTC within Khejuri-II Block under Contai Sub-Division of Tamluk Division in Purba Meinipur District Zone-II (Phase-II),SM/11948 |
Augmentation |
Haldia Electrical Sub-Division |
Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Sri Krishanu Mondal, JE/Haldia Electrical Sub-Division. |
24/08/2022 |
16/08/2022 |
31/12/2025 |
29/12/2025 |
10 |
4,380 |
533.30 |
424.00 |
60 |
80 |
| 121 |
Tamluk Division |
PURBA MEDINIPUR |
Deshopran |
Replacement Tube Well of 2nd Tube Well & 1 (One) No. Boosting Tube Well for Sofiabad Water Supply Scheme of Deshapran (Contai-II) Block under Contai Sub-Division of Tamluk Division, PHE Dte. within Purba Medinipur District.,SM/11949 |
Augmentation |
Contai Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Junior Engineer,Sri Mrityunjoy Paria, JE/Haldia Electrical Sub-Division. |
24/08/2022 |
10/05/2023 |
31/12/2025 |
29/12/2025 |
7 |
0 |
71.08 |
11.77 |
10 |
17 |
| 122 |
Tamluk Division |
PURBA MEDINIPUR |
Haldia |
Different works for Providing Functional Household Tap Connection (FHTC) by Augmentation of Dakshin Chak Water Supply Scheme. ,SM/11979 |
Augmentation |
Haldia Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Junior Engineer,Sri Tanmoy Shee, JE/Haldia Electrical Sub-Division. |
31/08/2022 |
12/07/2023 |
31/12/2025 |
29/12/2025 |
10 |
7,010 |
1,668.76 |
620.95 |
40 |
37 |
| 123 |
Tamluk Division |
PURBA MEDINIPUR |
Khejuri - I |
Augmentation of Ground Water Based Sherkhanchak PWSS (Zone-I) to Accommodate FHTC in Khejuri-II Block under Contai Sub-Division of Tamluk Division in Purba Medinipur District. ,SM/11984 |
Augmentation |
Contai Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Junior Engineer,Sri Krishanu Mondal, JE/Haldia Electrical Sub-Division.,Sri Mrityunjoy Paria, JE/Haldia Electrical Sub-Division. |
01/09/2022 |
27/09/2022 |
31/03/2025 |
29/12/2025 |
11 |
7,156 |
1,454.18 |
1,206.80 |
90 |
83 |
| 124 |
Tamluk Division |
PURBA MEDINIPUR |
Egra - II |
Augmentation of Ground Water Based Piped Water Supply Scheme for Paniparul Zone-I ,SM/12118 |
Augmentation |
Digha Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Junior Engineer,Sri Sukanta Mondal, JE/Haldia Electrical Sub-Division. |
06/09/2022 |
27/09/2022 |
31/12/2025 |
29/12/2025 |
16 |
3,903 |
1,079.89 |
667.39 |
44 |
62 |
| 125 |
Tamluk Division |
PURBA MEDINIPUR |
Tamluk |
CHAWRAKALGANDA AND ADJOINING MOUJAS PWSS,SM/12129 |
New |
Tamluk Sadar Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Junior Engineer,Sri Raju Pramanik, JE/Haldia Electrical Sub-Division. |
07/09/2022 |
02/05/2023 |
31/12/2025 |
29/12/2025 |
3 |
2,545 |
582.43 |
489.58 |
30 |
84 |
| 126 |
Tamluk Division |
PURBA MEDINIPUR |
Sahid Matangini |
DAKSHIN UTASPUR & ADJOINING MOUJAS PWSS,SM/12130 |
New |
Tamluk Sadar Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Junior Engineer,Sri Raju Pramanik, JE/Haldia Electrical Sub-Division. |
07/09/2022 |
12/07/2023 |
31/12/2025 |
29/12/2025 |
8 |
1,566 |
411.46 |
104.11 |
50 |
25 |
| 127 |
Tamluk Division |
PURBA MEDINIPUR |
Sahid Matangini |
AGAR & ADJOINING MOUJAS PWSS,SM/12131 |
New |
Tamluk Sadar Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Junior Engineer,Sri Raju Pramanik, JE/Haldia Electrical Sub-Division. |
07/09/2022 |
31/05/2023 |
31/12/2025 |
29/12/2025 |
9 |
832 |
388.58 |
145.85 |
60 |
38 |
| 128 |
Tamluk Division |
PURBA MEDINIPUR |
Moyna |
Tilkhoja & Adjoining mouzas,SM/12133 |
New |
Haldia Electrical Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Sri Krishanu Mondal, JE/Haldia Electrical Sub-Division. |
07/09/2022 |
16/08/2023 |
31/03/2025 |
29/12/2025 |
7 |
2,331 |
714.12 |
367.31 |
80 |
51 |
| 129 |
Tamluk Division |
PURBA MEDINIPUR |
Bhagawanpur - I |
BETULYA CHAKLALPUR PWSS & ADJOINING MOUZAS,SM/12134 |
New |
Contai Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Junior Engineer,Sri Sukanta Mondal, JE/Haldia Electrical Sub-Division. |
07/09/2022 |
02/05/2023 |
31/12/2025 |
29/12/2025 |
6 |
1,988 |
706.44 |
78.15 |
10 |
11 |
| 130 |
Tamluk Division |
PURBA MEDINIPUR |
Potashpur - I |
NAIPUR & ADJOINING MOUZAS ,SM/12135 |
New |
Contai Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Junior Engineer,Sri Sukanta Mondal, JE/Haldia Electrical Sub-Division. |
07/09/2022 |
11/07/2023 |
11/07/2025 |
29/12/2025 |
5 |
1,575 |
550.96 |
203.83 |
10 |
37 |
| 131 |
Tamluk Division |
PURBA MEDINIPUR |
Bhagawanpur - I |
KALABERIA & ADJOINING MOUZAS,SM/12136 |
New |
Contai Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Junior Engineer,Sri Ujjal Kumar Dey, JE/Haldia Electrical Sub-Division. |
07/09/2022 |
11/07/2023 |
11/07/2025 |
29/12/2025 |
3 |
3,184 |
743.49 |
61.24 |
10 |
8 |
| 132 |
Tamluk Division |
PURBA MEDINIPUR |
Sahid Matangini |
JAMITTA & ADJOINING MOUZAS,SM/12137 |
New |
Tamluk Sadar Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Junior Engineer,Sri Raju Pramanik, JE/Haldia Electrical Sub-Division. |
07/09/2022 |
15/03/2023 |
31/12/2025 |
29/12/2025 |
11 |
1,163 |
373.67 |
162.61 |
65 |
44 |
| 133 |
Tamluk Division |
PURBA MEDINIPUR |
Bhagawanpur - I |
KAKRA & ADJOINING MOUZAS,SM/12138 |
New |
Contai Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Junior Engineer,Sri Sukanta Mondal, JE/Haldia Electrical Sub-Division. |
07/09/2022 |
04/05/2023 |
31/12/2025 |
29/12/2025 |
6 |
3,218 |
784.19 |
522.94 |
40 |
67 |
| 134 |
Tamluk Division |
PURBA MEDINIPUR |
Sahid Matangini |
RAMCHANDRAPUR AND ITS ADJOINING MOUJAS PWSS,SM/12140 |
New |
Tamluk Sadar Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Junior Engineer,Sri Raju Pramanik, JE/Haldia Electrical Sub-Division. |
07/09/2022 |
17/04/2023 |
31/12/2025 |
29/12/2025 |
4 |
2,038 |
582.10 |
358.01 |
80 |
62 |
| 135 |
Tamluk Division |
PURBA MEDINIPUR |
Potashpur - II |
MALIKPUR AND IT'S ADJOINING MOUJAS PWSS,SM/12141 |
New |
Contai Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Junior Engineer,Sri Sukanta Mondal, JE/Haldia Electrical Sub-Division. |
07/09/2022 |
11/07/2023 |
11/07/2025 |
29/12/2025 |
4 |
2,407 |
894.23 |
275.70 |
40 |
31 |
| 136 |
Tamluk Division |
PURBA MEDINIPUR |
Sutahata |
HARIBALLABHPUR AND ADJOINING MOUJAS PWSS,SM/12142 |
New |
Haldia Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Junior Engineer,Sri Tanmoy Shee, JE/Haldia Electrical Sub-Division. |
07/09/2022 |
02/03/2023 |
31/12/2025 |
29/12/2025 |
17 |
1,730 |
722.20 |
312.55 |
80 |
43 |
| 137 |
Tamluk Division |
PURBA MEDINIPUR |
Potashpur - II |
BALGOBINDAPUR & ADJOINING MOUZAS,SM/12143 |
New |
Contai Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Junior Engineer,Sri Sukanta Mondal, JE/Haldia Electrical Sub-Division. |
07/09/2022 |
11/07/2023 |
11/07/2025 |
29/12/2025 |
5 |
2,138 |
879.41 |
60.99 |
40 |
7 |
| 138 |
Tamluk Division |
PURBA MEDINIPUR |
Moyna |
BASANTA CHAK AND ADJOINING MOUJAS PWSS,SM/12144 |
New |
Haldia Electrical Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Sri Krishanu Mondal, JE/Haldia Electrical Sub-Division. |
07/09/2022 |
16/08/2023 |
31/12/2025 |
29/12/2025 |
6 |
2,072 |
564.98 |
390.26 |
15 |
69 |
| 139 |
Tamluk Division |
PURBA MEDINIPUR |
Potashpur - II |
TANIA BILA AND ADJOINING MOUJAS PWSS,SM/12145 |
New |
Contai Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Junior Engineer,Sri Sukanta Mondal, JE/Haldia Electrical Sub-Division. |
07/09/2022 |
25/07/2023 |
31/12/2025 |
29/12/2025 |
4 |
1,236 |
510.18 |
201.69 |
6 |
40 |
| 140 |
Tamluk Division |
PURBA MEDINIPUR |
Bhagawanpur - II |
BRINDABANPUR & ADJOINING MOUJAS PWSS,SM/12148 |
New |
Contai Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Junior Engineer,Sri Sukanta Mondal, JE/Haldia Electrical Sub-Division. |
07/09/2022 |
06/06/2023 |
31/12/2025 |
29/12/2025 |
6 |
1,023 |
429.14 |
257.11 |
55 |
60 |
| 141 |
Tamluk Division |
PURBA MEDINIPUR |
Sahid Matangini |
GOBINDAPUR & ADJOINING MOUZAS,SM/12149 |
New |
Tamluk Sadar Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Junior Engineer,Sri Raju Pramanik, JE/Haldia Electrical Sub-Division. |
07/09/2022 |
12/07/2023 |
31/12/2025 |
29/12/2025 |
4 |
910 |
385.96 |
23.61 |
15 |
6 |
| 142 |
Tamluk Division |
PURBA MEDINIPUR |
Sahid Matangini |
HOGALBERYA AND ADJOINING MOUJAS PWSS,SM/12150 |
New |
Tamluk Sadar Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Junior Engineer,Sri Raju Pramanik, JE/Haldia Electrical Sub-Division. |
07/09/2022 |
12/07/2023 |
31/12/2025 |
29/12/2025 |
3 |
2,680 |
762.45 |
9.27 |
10 |
1 |
| 143 |
Tamluk Division |
PURBA MEDINIPUR |
Sahid Matangini |
SANTIPUR AND IT'S ADJOINING MOUJAS PWSS,SM/12151 |
New |
Tamluk Sadar Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Junior Engineer,Sri Raju Pramanik, JE/Haldia Electrical Sub-Division. |
07/09/2022 |
02/05/2023 |
31/12/2025 |
29/12/2025 |
8 |
2,338 |
687.40 |
32.14 |
50 |
5 |
| 144 |
Tamluk Division |
PURBA MEDINIPUR |
Sahid Matangini |
HARINAN PWSS & ADJOINING MOUJAS,SM/12152 |
New |
Tamluk Sadar Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Junior Engineer,Sri Raju Pramanik, JE/Haldia Electrical Sub-Division. |
07/09/2022 |
04/05/2023 |
31/12/2025 |
29/12/2025 |
8 |
2,360 |
708.52 |
444.90 |
44 |
63 |
| 145 |
Tamluk Division |
PURBA MEDINIPUR |
Bhagawanpur - I |
MIRJAPUR AND ADJOINING MOUJAS PWSS,SM/12153 |
New |
Contai Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Junior Engineer,Sri Mrityunjoy Paria, JE/Haldia Electrical Sub-Division.,Sri Sukanta Mondal, JE/Haldia Electrical Sub-Division. |
07/09/2022 |
04/05/2023 |
31/12/2025 |
29/12/2025 |
7 |
2,305 |
939.19 |
523.49 |
50 |
56 |
| 146 |
Tamluk Division |
PURBA MEDINIPUR |
Bhagawanpur - I |
PURBA RADHAPUR & ADJOINING MOUZAS,SM/12154 |
New |
Contai Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Junior Engineer,Sri Sukanta Mondal, JE/Haldia Electrical Sub-Division. |
07/09/2022 |
08/06/2023 |
31/12/2025 |
29/12/2025 |
8 |
1,870 |
758.06 |
309.35 |
25 |
41 |
| 147 |
Tamluk Division |
PURBA MEDINIPUR |
Potashpur - I |
GOYALDA & ADJOINING MOUZAS PWSS,SM/12155 |
New |
Contai Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Junior Engineer,Sri Sukanta Mondal, JE/Haldia Electrical Sub-Division. |
07/09/2022 |
01/06/2023 |
31/12/2025 |
29/12/2025 |
5 |
1,582 |
579.91 |
249.05 |
60 |
43 |
| 148 |
Tamluk Division |
PURBA MEDINIPUR |
Moyna |
RADHABALLAV CHAK & ADJOINING MOUZAS,SM/12156 |
New |
Haldia Electrical Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Sri Krishanu Mondal, JE/Haldia Electrical Sub-Division. |
07/09/2022 |
16/08/2023 |
31/03/2025 |
29/12/2025 |
6 |
2,026 |
715.87 |
421.65 |
70 |
59 |
| 149 |
Tamluk Division |
PURBA MEDINIPUR |
Bhagawanpur - I |
GOPINATHPUR & ADJOINING MOUZAS,SM/12158 |
New |
Contai Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Junior Engineer,Sri Sukanta Mondal, JE/Haldia Electrical Sub-Division. |
07/09/2022 |
04/05/2023 |
31/12/2025 |
29/12/2025 |
6 |
1,851 |
727.42 |
460.51 |
50 |
63 |
| 150 |
Tamluk Division |
PURBA MEDINIPUR |
Moyna |
UTTAR CHANDRA CHAK AND ADJOINING MOUJAS PWSS,SM/12160 |
New |
Haldia Electrical Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Sri Krishanu Mondal, JE/Haldia Electrical Sub-Division. |
07/09/2022 |
16/08/2023 |
31/12/2025 |
29/12/2025 |
6 |
2,064 |
751.44 |
370.43 |
15 |
49 |
| 151 |
Tamluk Division |
PURBA MEDINIPUR |
Bhagawanpur - I |
ABAS BERYA & ADJOINING MOUZAS,SM/12162 |
New |
Contai Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Junior Engineer,Sri Sukanta Mondal, JE/Haldia Electrical Sub-Division. |
07/09/2022 |
12/07/2023 |
31/12/2025 |
29/12/2025 |
6 |
1,576 |
620.61 |
146.40 |
40 |
24 |
| 152 |
Tamluk Division |
PURBA MEDINIPUR |
Potashpur - II |
SATSATMAL & ADJOINING MOUJAS PWSS,SM/12163 |
New |
Contai Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Junior Engineer,Sri Sukanta Mondal, JE/Haldia Electrical Sub-Division. |
07/09/2022 |
25/07/2023 |
31/12/2025 |
29/12/2025 |
6 |
2,638 |
975.70 |
366.27 |
15 |
38 |
| 153 |
Tamluk Division |
PURBA MEDINIPUR |
Khejuri - I |
PATNA & ADJOINING MOUZAS,SM/12164 |
New |
Contai Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Junior Engineer,Sri Krishanu Mondal, JE/Haldia Electrical Sub-Division. |
07/09/2022 |
12/07/2023 |
31/12/2025 |
29/12/2025 |
8 |
2,930 |
1,065.08 |
491.24 |
30 |
46 |
| 154 |
Tamluk Division |
PURBA MEDINIPUR |
Moyna |
GOKULNAGAR AND ADJOINING MOUJAS,SM/12165 |
New |
Haldia Electrical Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Sri Krishanu Mondal, JE/Haldia Electrical Sub-Division. |
07/09/2022 |
16/08/2023 |
31/12/2025 |
29/12/2025 |
6 |
2,421 |
821.18 |
422.89 |
75 |
51 |
| 155 |
Tamluk Division |
PURBA MEDINIPUR |
Bhagawanpur - II |
URURI AND ADJOINING MOUJAS PWSS ,SM/12166 |
New |
Contai Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Junior Engineer,Sri Sukanta Mondal, JE/Haldia Electrical Sub-Division. |
07/09/2022 |
10/03/2023 |
31/12/2025 |
29/12/2025 |
12 |
2,233 |
816.68 |
313.80 |
35 |
38 |
| 156 |
Tamluk Division |
PURBA MEDINIPUR |
Bhagawanpur - II |
KAYEMGERYA AND ADJOINING MOUJAS PWSS,SM/12167 |
New |
Contai Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Junior Engineer,Sri Sukanta Mondal, JE/Haldia Electrical Sub-Division. |
07/09/2022 |
27/03/2023 |
31/12/2025 |
29/12/2025 |
8 |
2,055 |
744.93 |
333.41 |
40 |
45 |
| 157 |
Tamluk Division |
PURBA MEDINIPUR |
Potashpur - II |
KEKAI & ADJOINING MOUJAS PWSS,SM/12168 |
New |
Contai Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Junior Engineer,Sri Sukanta Mondal, JE/Haldia Electrical Sub-Division. |
07/09/2022 |
11/07/2023 |
11/07/2025 |
29/12/2025 |
9 |
1,793 |
742.03 |
186.85 |
10 |
25 |
| 158 |
Tamluk Division |
PURBA MEDINIPUR |
Bhagawanpur - II |
BAHADURPUR AND ADJOINING MOUJAS PWSS,SM/12169 |
New |
Contai Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Junior Engineer,Sri Sukanta Mondal, JE/Haldia Electrical Sub-Division. |
07/09/2022 |
12/05/2023 |
31/12/2025 |
29/12/2025 |
11 |
2,470 |
915.42 |
443.06 |
20 |
48 |
| 159 |
Tamluk Division |
PURBA MEDINIPUR |
Potashpur - II |
PANCHET AND ADJOINING MOUJAS PWSS,SM/12170 |
New |
Contai Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Sri Sukanta Mondal, JE/Haldia Electrical Sub-Division. |
07/09/2022 |
11/07/2023 |
11/07/2025 |
29/12/2025 |
7 |
1,919 |
897.82 |
240.22 |
59 |
27 |
| 160 |
Tamluk Division |
PURBA MEDINIPUR |
Bhagawanpur - II |
MANIKJOR AND ADJOINING MOUJAS PWSS,SM/12171 |
New |
Contai Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Junior Engineer,Sri Ujjal Kumar Dey, JE/Haldia Electrical Sub-Division. |
07/09/2022 |
27/03/2023 |
31/12/2025 |
29/12/2025 |
10 |
2,206 |
927.42 |
227.91 |
10 |
25 |
| 161 |
Tamluk Division |
PURBA MEDINIPUR |
Potashpur - II |
KASBAPATASHPUR & ADJOINING MOUJAS PWSS,SM/12172 |
New |
Haldia Electrical Sub-Division |
Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Sri Sukanta Mondal, JE/Haldia Electrical Sub-Division. |
07/09/2022 |
11/07/2023 |
11/07/2025 |
29/12/2025 |
5 |
1,875 |
664.72 |
55.51 |
10 |
8 |
| 162 |
Tamluk Division |
PURBA MEDINIPUR |
Bhagawanpur - II |
PANCH BAJARI & ADJOINING MOUJAS PWSS,SM/12173 |
New |
Contai Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Junior Engineer,Sri Sukanta Mondal, JE/Haldia Electrical Sub-Division. |
07/09/2022 |
28/04/2023 |
31/12/2025 |
29/12/2025 |
9 |
1,015 |
484.28 |
163.24 |
70 |
34 |
| 163 |
Tamluk Division |
PURBA MEDINIPUR |
Potashpur - II |
KHARAT KATBAR & ADJOINING MOUJAS PWSS,SM/12175 |
New |
Contai Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Junior Engineer,Sri Sukanta Mondal, JE/Haldia Electrical Sub-Division. |
07/09/2022 |
11/07/2023 |
11/07/2025 |
29/12/2025 |
8 |
1,895 |
725.48 |
140.92 |
10 |
19 |
| 164 |
Tamluk Division |
PURBA MEDINIPUR |
Egra - II |
RUKMINIPUR AND ADJOINING MOUJAS PWSS,SM/12176 |
New |
Digha Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Junior Engineer,Sri Sukanta Mondal, JE/Haldia Electrical Sub-Division. |
07/09/2022 |
04/05/2023 |
31/12/2025 |
29/12/2025 |
5 |
1,588 |
739.06 |
256.88 |
10 |
35 |
| 165 |
Tamluk Division |
PURBA MEDINIPUR |
Egra - I |
Retrofitting to Accommodate FHTC under JJM in Sarrang PWSS under Egra-I Block. ,SM/12177 |
Retrofitting |
Digha Sub-Division |
Assistant Engineer |
Junior Engineer |
07/09/2022 |
01/04/2018 |
31/12/2025 |
29/12/2025 |
3 |
2,657 |
154.98 |
81.24 |
90 |
52 |
| 166 |
Tamluk Division |
PURBA MEDINIPUR |
Contai - I |
Ground Water Based Contai Saline Area PWSS to Accommodate FHTC in Contai-I & III Block under Contai Sub-Division of Tamluk Division in Purba Medinipur District (Zone-II) ,SM/12268 |
Augmentation |
Contai Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Junior Engineer,Sri Mrityunjoy Paria, JE/Haldia Electrical Sub-Division.,Sri Sukanta Mondal, JE/Haldia Electrical Sub-Division. |
09/09/2022 |
01/12/2022 |
31/12/2025 |
29/12/2025 |
7 |
6,014 |
1,409.77 |
612.75 |
25 |
43 |
| 167 |
Tamluk Division |
PURBA MEDINIPUR |
Contai - I |
Ground Water Based Contai Saline Area (Zone-III) (Phase-B) PWSS to Accommodate FHTC in Contai-I & III Block under Contai Sub-Division of Tamluk Division in Purba Medinipur District. ,SM/12279 |
Augmentation |
Contai Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Junior Engineer,Sri Mrityunjoy Paria, JE/Haldia Electrical Sub-Division. |
09/09/2022 |
09/12/2022 |
31/03/2025 |
29/12/2025 |
11 |
4,912 |
1,684.91 |
1,234.76 |
95 |
73 |
| 168 |
Tamluk Division |
PURBA MEDINIPUR |
Mahisadal |
MAYACHAR AND ADJOINING MOUJAS PWSS,SM/12281 |
New |
Haldia Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Junior Engineer,Sri Krishanu Mondal, JE/Haldia Electrical Sub-Division. |
09/09/2022 |
16/05/2023 |
31/12/2025 |
29/12/2025 |
10 |
1,306 |
575.50 |
222.47 |
63 |
39 |
| 169 |
Tamluk Division |
PURBA MEDINIPUR |
Potashpur - I |
MAKRAMPUR AND ADJOINING MOUJAS PWSS,SM/12282 |
New |
Contai Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Junior Engineer,Sri Sukanta Mondal, JE/Haldia Electrical Sub-Division. |
09/09/2022 |
11/07/2023 |
11/07/2025 |
29/12/2025 |
5 |
1,422 |
752.28 |
83.52 |
50 |
11 |
| 170 |
Tamluk Division |
PURBA MEDINIPUR |
Potashpur - I |
TALADIHA AND ADJOINING MOUJAS PWSS,SM/12283 |
New |
Contai Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Junior Engineer,Sri Sukanta Mondal, JE/Haldia Electrical Sub-Division. |
09/09/2022 |
08/06/2023 |
31/12/2025 |
29/12/2025 |
4 |
1,324 |
496.80 |
131.69 |
50 |
27 |
| 171 |
Tamluk Division |
PURBA MEDINIPUR |
Egra - II |
TAJPUR AND ADJOINING MOUJAS PWSS,SM/12284 |
New |
Digha Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Junior Engineer,Sri Sukanta Mondal, JE/Haldia Electrical Sub-Division. |
09/09/2022 |
12/07/2023 |
31/12/2025 |
29/12/2025 |
7 |
2,785 |
815.19 |
357.01 |
20 |
44 |
| 172 |
Tamluk Division |
PURBA MEDINIPUR |
Potashpur - I |
DANGAR TULSI AND ADJOINING MOUJAS PWSS,SM/12285 |
New |
Contai Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Junior Engineer,Sri Sukanta Mondal, JE/Haldia Electrical Sub-Division. |
09/09/2022 |
11/07/2023 |
11/07/2025 |
29/12/2025 |
5 |
1,347 |
712.76 |
229.55 |
65 |
32 |
| 173 |
Tamluk Division |
PURBA MEDINIPUR |
Ramnagar - II |
NIJ MAITHUNA AND ADJOINING MOUJAS PWSS,SM/12286 |
New |
Digha Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Junior Engineer,Sri Mrityunjoy Paria, JE/Haldia Electrical Sub-Division. |
09/09/2022 |
12/05/2023 |
31/03/2025 |
29/12/2025 |
13 |
2,130 |
776.00 |
396.23 |
90 |
51 |
| 174 |
Tamluk Division |
PURBA MEDINIPUR |
Egra - I |
TELAMI AND ADJOINING MOUJAS PWSS,SM/12288 |
New |
Digha Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Junior Engineer,Sri Mrityunjoy Paria, JE/Haldia Electrical Sub-Division. |
09/09/2022 |
11/07/2023 |
11/07/2025 |
29/12/2025 |
6 |
724 |
462.76 |
155.17 |
40 |
34 |
| 175 |
Tamluk Division |
PURBA MEDINIPUR |
Khejuri - I |
KANTHI BARI AND ADJOINING MOUJAS PWSS,SM/12289 |
New |
Contai Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Junior Engineer,Sri Krishanu Mondal, JE/Haldia Electrical Sub-Division. |
09/09/2022 |
28/04/2023 |
31/12/2025 |
29/12/2025 |
7 |
1,276 |
795.33 |
445.53 |
15 |
56 |
| 176 |
Tamluk Division |
PURBA MEDINIPUR |
Egra - I |
BAISPUR AND ADJOINING MOUJAS PWSS,SM/12290 |
New |
Digha Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Junior Engineer,Sri Mrityunjoy Paria, JE/Haldia Electrical Sub-Division. |
09/09/2022 |
11/07/2023 |
11/07/2025 |
29/12/2025 |
4 |
1,251 |
495.84 |
224.07 |
50 |
45 |
| 177 |
Tamluk Division |
PURBA MEDINIPUR |
Egra - II |
UTTAR DAIDPUR AND ADJOINING MOUJAS PWSS,SM/12291 |
New |
Digha Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Junior Engineer,Sri Sukanta Mondal, JE/Haldia Electrical Sub-Division. |
09/09/2022 |
19/07/2023 |
31/03/2025 |
29/12/2025 |
5 |
1,648 |
717.02 |
321.97 |
60 |
45 |
| 178 |
Tamluk Division |
PURBA MEDINIPUR |
Bhagawanpur - II |
PACHAHRI & ADJOINING MOUJAS PWSS,SM/12292 |
New |
Contai Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Junior Engineer,Sri Sukanta Mondal, JE/Haldia Electrical Sub-Division. |
09/09/2022 |
28/04/2023 |
31/12/2025 |
29/12/2025 |
13 |
2,014 |
614.09 |
319.83 |
80 |
52 |
| 179 |
Tamluk Division |
PURBA MEDINIPUR |
Bhagawanpur - II |
DAKSHINPATHAR BERYA AND ADJOINING MOUJAS PWSS,SM/12293 |
New |
Contai Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Junior Engineer,Sri Sukanta Mondal, JE/Haldia Electrical Sub-Division. |
09/09/2022 |
28/04/2023 |
31/03/2025 |
29/12/2025 |
7 |
1,638 |
665.46 |
210.21 |
48 |
32 |
| 180 |
Tamluk Division |
PURBA MEDINIPUR |
Bhagawanpur - I |
ILASHPUR AND ADJOINING MOUJAS PWSS,SM/12294 |
New |
Contai Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Junior Engineer,Sri Sukanta Mondal, JE/Haldia Electrical Sub-Division. |
09/09/2022 |
04/05/2023 |
31/12/2025 |
29/12/2025 |
7 |
2,038 |
847.64 |
423.18 |
50 |
50 |
| 181 |
Tamluk Division |
PURBA MEDINIPUR |
Moyna |
NAICHHANPUR AND ADJOINING MOUJAS PWSS,SM/12295 |
New |
Tamluk Sadar Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Junior Engineer,Sri Krishanu Mondal, JE/Haldia Electrical Sub-Division. |
09/09/2022 |
15/03/2023 |
31/12/2025 |
29/12/2025 |
10 |
1,513 |
593.04 |
407.94 |
50 |
69 |
| 182 |
Tamluk Division |
PURBA MEDINIPUR |
Egra - I |
SAHARA AND ADJOINING MOUJAS PWSS,SM/12296 |
New |
Digha Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Junior Engineer,Sri Mrityunjoy Paria, JE/Haldia Electrical Sub-Division. |
09/09/2022 |
11/07/2023 |
11/07/2025 |
29/12/2025 |
5 |
1,155 |
500.78 |
210.05 |
25 |
42 |
| 183 |
Tamluk Division |
PURBA MEDINIPUR |
Bhagawanpur - II |
BASUDEVBERYA AND ADJOINING MOUJAS PWSS,SM/12297 |
New |
Contai Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Junior Engineer,Sri Sukanta Mondal, JE/Haldia Electrical Sub-Division. |
09/09/2022 |
10/03/2023 |
31/12/2025 |
29/12/2025 |
13 |
1,064 |
541.09 |
207.24 |
75 |
38 |
| 184 |
Tamluk Division |
PURBA MEDINIPUR |
Egra - II |
ERENDA AND ADJOINING MOUJAS PWSS,SM/12298 |
New |
Digha Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Junior Engineer,Sri Sukanta Mondal, JE/Haldia Electrical Sub-Division. |
09/09/2022 |
21/07/2023 |
31/12/2025 |
29/12/2025 |
5 |
1,749 |
697.48 |
264.12 |
15 |
38 |
| 185 |
Tamluk Division |
PURBA MEDINIPUR |
Sahid Matangini |
GATHRA AND ADJOINING MOUJAS PWSS,SM/12299 |
New |
Tamluk Sadar Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Junior Engineer,Sri Raju Pramanik, JE/Haldia Electrical Sub-Division. |
09/09/2022 |
17/04/2023 |
31/12/2025 |
29/12/2025 |
9 |
3,418 |
627.78 |
307.49 |
75 |
49 |
| 186 |
Tamluk Division |
PURBA MEDINIPUR |
Moyna |
Retrofitting to accommodate FHTC (1841 Nos.) of Chandibenia Zone-II and its adjoining mouzas water supply scheme under JJM within Moyna Block under Tamluk Sub-Division of Tamluk Division, PHE Dte. in the district Purba Medinipur.,SM/12300 |
Retrofitting |
Tamluk Sadar Sub-Division |
Assistant Engineer |
Junior Engineer |
09/09/2022 |
26/09/2022 |
31/12/2025 |
29/12/2025 |
2 |
1,841 |
94.16 |
69.04 |
75 |
73 |
| 187 |
Tamluk Division |
PURBA MEDINIPUR |
Sahid Matangini |
Retrofitting to accommodate FHTC (2244 Nos.) under JJM in Uttar Dhalhara Zone-I Water Supply Scheme for Sahid Matangini Dev. Block in the district of Purba Medinipur.,SM/12301 |
Retrofitting |
Tamluk Sadar Sub-Division |
Assistant Engineer |
Junior Engineer |
09/09/2022 |
26/09/2022 |
31/12/2025 |
29/12/2025 |
2 |
2,244 |
112.80 |
68.76 |
80 |
61 |
| 188 |
Tamluk Division |
PURBA MEDINIPUR |
Khejuri - II |
Retrofitting to Accommodate FHTC under JJM in Nijkasba PWSS under Khejuri-II Block. ,SM/12302 |
Retrofitting |
Contai Sub-Division |
Assistant Engineer |
Junior Engineer |
09/09/2022 |
19/12/2022 |
31/12/2025 |
29/12/2025 |
4 |
763 |
45.03 |
42.38 |
90 |
94 |
| 189 |
Tamluk Division |
PURBA MEDINIPUR |
Egra - II |
Retrofitting to Accommodate FHTC under JJM in Baranalgeria (Zone-I) PWSS under Egra-II Block. ,SM/12303 |
Retrofitting |
Digha Sub-Division |
Assistant Engineer |
Junior Engineer |
09/09/2022 |
18/10/2022 |
31/12/2025 |
29/12/2025 |
3 |
2,340 |
135.48 |
68.75 |
30 |
51 |
| 190 |
Tamluk Division |
PURBA MEDINIPUR |
Egra - I |
BARDA AND ADJOINING MOUJAS PWSS,SM/12306 |
New |
Digha Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Junior Engineer,Sri Mrityunjoy Paria, JE/Haldia Electrical Sub-Division. |
09/09/2022 |
11/07/2023 |
11/07/2025 |
29/12/2025 |
6 |
1,396 |
594.37 |
151.46 |
45 |
25 |
| 191 |
Tamluk Division |
PURBA MEDINIPUR |
Egra - I |
JERTHAN AND ADJOINING MOUJAS PWSS,SM/12308 |
New |
Digha Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Junior Engineer,Sri Mrityunjoy Paria, JE/Haldia Electrical Sub-Division. |
09/09/2022 |
11/07/2023 |
11/07/2025 |
29/12/2025 |
5 |
2,232 |
762.33 |
468.18 |
52 |
61 |
| 192 |
Tamluk Division |
PURBA MEDINIPUR |
Bhagawanpur - I |
SARBERYA AND ADJOINING MOUJAS PWSS at Bhagwanpur-I Block.,SM/12310 |
New |
Contai Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Junior Engineer,Sri Sukanta Mondal, JE/Haldia Electrical Sub-Division. |
09/09/2022 |
04/05/2023 |
31/12/2025 |
29/12/2025 |
14 |
2,095 |
899.01 |
461.35 |
70 |
51 |
| 193 |
Tamluk Division |
PURBA MEDINIPUR |
Moyna |
CHONGRA AND ADJOINING MOUJAS PWSS at Moyna Block.,SM/12318 |
New |
Haldia Electrical Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Sri Krishanu Mondal, JE/Haldia Electrical Sub-Division. |
09/09/2022 |
16/08/2023 |
31/12/2025 |
29/12/2025 |
7 |
1,929 |
727.81 |
355.97 |
80 |
49 |
| 194 |
Tamluk Division |
PURBA MEDINIPUR |
Potashpur - I |
TAPINDA AND ADJOINING MOUJAS PWSS at Potashpur_I Block.,SM/12319 |
New |
Contai Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Junior Engineer,Sri Sukanta Mondal, JE/Haldia Electrical Sub-Division. |
09/09/2022 |
11/07/2023 |
11/07/2025 |
29/12/2025 |
5 |
1,165 |
532.38 |
147.97 |
5 |
28 |
| 195 |
Tamluk Division |
PURBA MEDINIPUR |
Egra - I |
ALANGIRI AND ADJOINING MOUJAS PWSS at Agra-I Block.,SM/12320 |
New |
Digha Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Junior Engineer,Sri Mrityunjoy Paria, JE/Haldia Electrical Sub-Division. |
09/09/2022 |
12/07/2023 |
12/07/2025 |
29/12/2025 |
5 |
1,497 |
674.76 |
220.78 |
64 |
33 |
| 196 |
Tamluk Division |
PURBA MEDINIPUR |
Ramnagar - I |
SANTRA AND IT'S ADJOINING MOUJAS PWSS at Ramnagar-I Block.,SM/12322 |
New |
Digha Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Junior Engineer,Sri Mrityunjoy Paria, JE/Haldia Electrical Sub-Division. |
09/09/2022 |
11/07/2023 |
11/07/2025 |
29/12/2025 |
6 |
1,709 |
556.00 |
286.32 |
15 |
51 |
| 197 |
Tamluk Division |
PURBA MEDINIPUR |
Contai - III |
Ground Water Based Contai Saline Area Zone-I PWSS to Accommodate FHTC in Contai-I & III Block under Contai Sub-Division of Tamluk Division in Purba Medinipur District (Phase-B).,SM/12364 |
Augmentation |
Contai Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Junior Engineer,Sri Mrityunjoy Paria, JE/Haldia Electrical Sub-Division. |
13/09/2022 |
05/01/2023 |
31/12/2025 |
29/12/2025 |
23 |
5,100 |
1,068.67 |
489.58 |
35 |
46 |
| 198 |
Tamluk Division |
PURBA MEDINIPUR |
Potashpur - II |
MUSTAPHAPUR AND ADJOINING MOUJAS PWSS,SM/12398 |
New |
Contai Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Sri Sukanta Mondal, JE/Haldia Electrical Sub-Division. |
13/09/2022 |
11/07/2023 |
11/07/2025 |
29/12/2025 |
7 |
1,806 |
645.50 |
211.13 |
55 |
33 |
| 199 |
Tamluk Division |
PURBA MEDINIPUR |
Potashpur - I |
BARAHAT AND ADJOINING MOUJAS Piped Water Supply Scheme,SM/12399 |
New |
Contai Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Junior Engineer,Sri Sukanta Mondal, JE/Haldia Electrical Sub-Division. |
13/09/2022 |
11/07/2023 |
11/07/2025 |
29/12/2025 |
5 |
1,808 |
696.35 |
157.84 |
15 |
23 |
| 200 |
Tamluk Division |
PURBA MEDINIPUR |
Potashpur - I |
PAHARPUR AND ADJOINING MOUJAS Piped Water Supply Scheme,SM/12400 |
New |
Contai Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Junior Engineer,Sri Sukanta Mondal, JE/Haldia Electrical Sub-Division. |
13/09/2022 |
11/07/2023 |
11/07/2025 |
29/12/2025 |
4 |
1,112 |
465.14 |
197.19 |
10 |
42 |
| 201 |
Tamluk Division |
PURBA MEDINIPUR |
Bhagawanpur - I |
NILKANTHAPUR AND ADJOINING MOUJAS Piped Water Supply Scheme,SM/12402 |
New |
Contai Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Junior Engineer,Sri Sukanta Mondal, JE/Haldia Electrical Sub-Division. |
13/09/2022 |
10/04/2023 |
30/09/2025 |
29/12/2025 |
6 |
1,669 |
650.26 |
187.26 |
35 |
29 |
| 202 |
Tamluk Division |
PURBA MEDINIPUR |
Mahisadal |
KANCHANPUR AND ADJOINING MOUJAS PWSS,SM/12403 |
New |
Haldia Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Junior Engineer,Sri Krishanu Mondal, JE/Haldia Electrical Sub-Division. |
13/09/2022 |
14/03/2023 |
31/12/2025 |
29/12/2025 |
17 |
1,704 |
584.24 |
217.35 |
35 |
37 |
| 203 |
Tamluk Division |
PURBA MEDINIPUR |
Bhagawanpur - I |
DWARIKAPUR AND IT'S ADJOINING MOUJAAS PWSS,SM/12404 |
New |
Contai Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Junior Engineer,Sri Ujjal Kumar Dey, JE/Haldia Electrical Sub-Division. |
13/09/2022 |
10/04/2023 |
31/12/2025 |
29/12/2025 |
4 |
1,656 |
572.81 |
13.98 |
10 |
2 |
| 204 |
Tamluk Division |
PURBA MEDINIPUR |
Deshopran |
DAKSHIN KADUA AND ADJOINING MOUJAS PWSS,SM/12405 |
New |
Contai Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Junior Engineer,Sri Mrityunjoy Paria, JE/Haldia Electrical Sub-Division. |
13/09/2022 |
21/07/2023 |
31/12/2025 |
29/12/2025 |
4 |
893 |
466.31 |
25.77 |
15 |
6 |
| 205 |
Tamluk Division |
PURBA MEDINIPUR |
Khejuri - I |
DAKSHIN KALAMDAN AND ADJOINING MOUJAS PWSS,SM/12406 |
New |
Contai Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Junior Engineer,Sri Krishanu Mondal, JE/Haldia Electrical Sub-Division. |
13/09/2022 |
12/07/2023 |
31/12/2025 |
29/12/2025 |
5 |
2,186 |
1,061.78 |
627.06 |
40 |
59 |
| 206 |
Tamluk Division |
PURBA MEDINIPUR |
Ramnagar - II |
DAKSHIN SHITALA AND ADJOINING MOUJAS PWSS,SM/12407 |
New |
Digha Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Junior Engineer,Sri Mrityunjoy Paria, JE/Haldia Electrical Sub-Division. |
13/09/2022 |
10/03/2023 |
31/12/2025 |
29/12/2025 |
17 |
1,020 |
545.08 |
251.40 |
30 |
46 |
| 207 |
Tamluk Division |
PURBA MEDINIPUR |
Ramnagar - II |
PURBO PURUSHOTTAMPUR AND IT'S ADJOINING MOUJAS PWSS,SM/12428 |
New |
Digha Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Junior Engineer,Sri Mrityunjoy Paria, JE/Haldia Electrical Sub-Division. |
13/09/2022 |
01/06/2023 |
31/03/2025 |
29/12/2025 |
7 |
618 |
412.24 |
210.46 |
80 |
51 |
| 208 |
Tamluk Division |
PURBA MEDINIPUR |
Ramnagar - I |
PADIMA AND ADJOINING MOUJAS PWSS,SM/12430 |
New |
Digha Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Junior Engineer,Sri Mrityunjoy Paria, JE/Haldia Electrical Sub-Division. |
13/09/2022 |
11/07/2023 |
11/07/2025 |
29/12/2025 |
7 |
960 |
460.25 |
266.36 |
80 |
58 |
| 209 |
Tamluk Division |
PURBA MEDINIPUR |
Khejuri - I |
CHINGUR DANIA AND IT'S ADJOINING MOUJAS PWSS,SM/12431 |
New |
Contai Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Junior Engineer,Sri Krishanu Mondal, JE/Haldia Electrical Sub-Division. |
13/09/2022 |
28/04/2023 |
31/03/2025 |
29/12/2025 |
5 |
1,342 |
827.64 |
379.15 |
60 |
46 |
| 210 |
Tamluk Division |
PURBA MEDINIPUR |
Potashpur - I |
TALCHITKINI AND IT'S ADJOINING MOUJAS PWSS,SM/12433 |
New |
Contai Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Junior Engineer,Sri Sukanta Mondal, JE/Haldia Electrical Sub-Division. |
13/09/2022 |
25/07/2023 |
31/12/2025 |
29/12/2025 |
3 |
1,833 |
540.95 |
20.29 |
45 |
4 |
| 211 |
Tamluk Division |
PURBA MEDINIPUR |
Ramnagar - I |
PURBA MUKUNDAPUR AND IT'S ADJOINING MOUJAS,SM/12434 |
New |
Digha Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Junior Engineer,Sri Mrityunjoy Paria, JE/Haldia Electrical Sub-Division. |
13/09/2022 |
11/07/2023 |
11/07/2025 |
29/12/2025 |
6 |
1,267 |
617.73 |
363.10 |
65 |
59 |
| 212 |
Tamluk Division |
PURBA MEDINIPUR |
Khejuri - I |
TIKASHI PWSS at Khejuri-I Block in Tamluk Division P.H.E. Dte.,SM/12482 |
New |
Contai Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Junior Engineer,Sri Krishanu Mondal, JE/Haldia Electrical Sub-Division. |
13/09/2022 |
12/05/2023 |
31/03/2025 |
29/12/2025 |
17 |
2,478 |
1,000.80 |
583.34 |
70 |
58 |
| 213 |
Tamluk Division |
PURBA MEDINIPUR |
Egra - II |
KHAGDA PWSS at Egra-II Block in Tamluk Division P.H.E. Dte.,SM/12483 |
New |
Digha Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Junior Engineer,Sri Sukanta Mondal, JE/Haldia Electrical Sub-Division. |
13/09/2022 |
31/07/2023 |
31/12/2025 |
29/12/2025 |
4 |
1,068 |
520.66 |
180.26 |
40 |
35 |
| 214 |
Tamluk Division |
PURBA MEDINIPUR |
Potashpur - I |
DHANKAR & IT'S ADJOINING MOUJAS at Potashpur-I Block.,SM/12484 |
New |
Contai Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Junior Engineer,Sri Sukanta Mondal, JE/Haldia Electrical Sub-Division. |
13/09/2022 |
25/07/2023 |
31/12/2025 |
29/12/2025 |
5 |
1,463 |
482.07 |
194.02 |
2 |
40 |
| 215 |
Tamluk Division |
PURBA MEDINIPUR |
Ramnagar - II |
Augmentation of Ramnagar (Zone-II) PWSS,SM/12486 |
Augmentation |
Digha Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Junior Engineer,Sri Mrityunjoy Paria, JE/Haldia Electrical Sub-Division. |
13/09/2022 |
19/01/2023 |
31/03/2025 |
29/12/2025 |
9 |
2,941 |
889.59 |
319.26 |
90 |
36 |
| 216 |
Tamluk Division |
PURBA MEDINIPUR |
Potashpur - I |
Augmentation of Ground Water Based Piped Water Supply Scheme for Amarshi Kasba Zone-I ,SM/12487 |
Augmentation |
Haldia Electrical Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Junior Engineer,Sri Sukanta Mondal, JE/Haldia Electrical Sub-Division. |
13/09/2022 |
30/01/2023 |
31/12/2025 |
29/12/2025 |
10 |
4,400 |
989.31 |
264.35 |
40 |
27 |
| 217 |
Tamluk Division |
PURBA MEDINIPUR |
Potashpur - I |
Augmentation of Ground Water Based Piped Water Supply Scheme for Amarshi Kasba Zone-II,SM/12488 |
Augmentation |
Haldia Electrical Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Junior Engineer,Sri Sukanta Mondal, JE/Haldia Electrical Sub-Division. |
13/09/2022 |
30/01/2023 |
31/12/2025 |
29/12/2025 |
12 |
2,338 |
740.92 |
390.43 |
85 |
53 |
| 218 |
Tamluk Division |
PURBA MEDINIPUR |
Ramnagar - II |
Augmentation of Ground Water Based Piped Water Supply Scheme for Narandia,SM/12491 |
Augmentation |
Digha Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Junior Engineer,Sri Mrityunjoy Paria, JE/Haldia Electrical Sub-Division. |
13/09/2022 |
20/12/2022 |
31/12/2025 |
29/12/2025 |
12 |
3,188 |
745.53 |
333.32 |
35 |
45 |
| 219 |
Tamluk Division |
PURBA MEDINIPUR |
Bhagawanpur - I |
SIMULYA & IT'S ADJOINING MOUJAS PWSS,SM/12492 |
New |
Contai Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Junior Engineer,Sri Sukanta Mondal, JE/Haldia Electrical Sub-Division. |
13/09/2022 |
04/05/2023 |
31/12/2025 |
29/12/2025 |
6 |
2,740 |
917.62 |
299.01 |
75 |
33 |
| 220 |
Tamluk Division |
PURBA MEDINIPUR |
Mahisadal |
BAMANPUR AND ADJOINING MOUJAS PWSS,SM/12493 |
New |
Haldia Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Junior Engineer,Sri Krishanu Mondal, JE/Haldia Electrical Sub-Division. |
13/09/2022 |
08/06/2023 |
31/03/2025 |
29/12/2025 |
13 |
1,362 |
606.04 |
252.31 |
25 |
42 |
| 221 |
Tamluk Division |
PURBA MEDINIPUR |
Egra - I |
SHWNIA AND ADJOINING MOUJAS PWSS,SM/12494 |
New |
Digha Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Junior Engineer,Sri Mrityunjoy Paria, JE/Haldia Electrical Sub-Division. |
13/09/2022 |
11/07/2023 |
11/07/2025 |
29/12/2025 |
4 |
734 |
453.35 |
171.35 |
25 |
38 |
| 222 |
Tamluk Division |
PURBA MEDINIPUR |
Khejuri - II |
CHAUDDHA CHULI AND IT'S ADJOINING MOUJAS PWSS,SM/12495 |
New |
Contai Sub-Division |
Assistant Engineer |
Junior Engineer,Sri Krishanu Mondal, JE/Haldia Electrical Sub-Division.,Sri Mrityunjoy Paria, JE/Haldia Electrical Sub-Division. |
13/09/2022 |
11/07/2023 |
11/07/2025 |
29/12/2025 |
4 |
1,623 |
581.74 |
124.65 |
10 |
21 |
| 223 |
Tamluk Division |
PURBA MEDINIPUR |
Potashpur - I |
SHOULA BHERI AND ADJOINING MOUJAS PWSS,SM/12496 |
New |
Contai Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Junior Engineer,Sri Sukanta Mondal, JE/Haldia Electrical Sub-Division. |
13/09/2022 |
11/07/2023 |
11/07/2025 |
29/12/2025 |
5 |
2,921 |
922.95 |
274.39 |
5 |
30 |
| 224 |
Tamluk Division |
PURBA MEDINIPUR |
Mahisadal |
MADHYA HINGLI AND ADJOINING MOUJAS PWSS,SM/12498 |
New |
Haldia Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Junior Engineer,Sri Krishanu Mondal, JE/Haldia Electrical Sub-Division. |
13/09/2022 |
02/03/2023 |
31/12/2025 |
29/12/2025 |
15 |
1,757 |
767.33 |
348.94 |
30 |
45 |
| 225 |
Tamluk Division |
PURBA MEDINIPUR |
Deshopran |
FULESHWAR AND ADJOINING MOUJAS PWSS,SM/12500 |
New |
Contai Sub-Division |
Assistant Engineer |
Junior Engineer,Sri Krishanu Mondal, JE/Haldia Electrical Sub-Division.,Sri Mrityunjoy Paria, JE/Haldia Electrical Sub-Division. |
13/09/2022 |
11/07/2023 |
11/07/2025 |
29/12/2025 |
7 |
1,268 |
658.22 |
209.00 |
5 |
32 |
| 226 |
Tamluk Division |
PURBA MEDINIPUR |
Bhagawanpur - I |
BARTTAN AND ADJOINING MOUJAS PWSS,SM/12501 |
New |
Contai Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Junior Engineer,Sri Sukanta Mondal, JE/Haldia Electrical Sub-Division. |
13/09/2022 |
04/05/2023 |
31/12/2025 |
29/12/2025 |
6 |
3,076 |
1,048.66 |
404.82 |
45 |
39 |
| 227 |
Tamluk Division |
PURBA MEDINIPUR |
Sutahata |
JAYNAGAR AND ADJOINING MOUJAS PWSS,SM/12502 |
New |
Haldia Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Junior Engineer,Sri Tanmoy Shee, JE/Haldia Electrical Sub-Division. |
13/09/2022 |
11/05/2023 |
31/12/2025 |
29/12/2025 |
13 |
2,174 |
773.24 |
228.70 |
38 |
30 |
| 228 |
Tamluk Division |
PURBA MEDINIPUR |
Egra - I |
SHIPUR AND ADJOINING MOUJAS PWSS,SM/12503 |
New |
Digha Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Junior Engineer,Sri Mrityunjoy Paria, JE/Haldia Electrical Sub-Division. |
13/09/2022 |
11/07/2023 |
11/07/2025 |
29/12/2025 |
4 |
1,484 |
698.50 |
262.80 |
10 |
38 |
| 229 |
Tamluk Division |
PURBA MEDINIPUR |
Bhagawanpur - I |
KHAGA AND IT'S ADJOINING MOUJAS PWSS,SM/12504 |
New |
Contai Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Junior Engineer,Sri Sukanta Mondal, JE/Haldia Electrical Sub-Division. |
13/09/2022 |
23/05/2023 |
31/12/2025 |
29/12/2025 |
7 |
1,806 |
764.31 |
310.87 |
25 |
41 |
| 230 |
Tamluk Division |
PURBA MEDINIPUR |
Deshopran |
CHALTI AND ADJOINING MOUJAS PWSS,SM/12505 |
New |
Contai Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Junior Engineer,Sri Mrityunjoy Paria, JE/Haldia Electrical Sub-Division. |
13/09/2022 |
11/07/2023 |
11/07/2025 |
29/12/2025 |
7 |
1,098 |
592.82 |
102.27 |
15 |
17 |
| 231 |
Tamluk Division |
PURBA MEDINIPUR |
Bhagawanpur - II |
PANUSI AND ADJOINING MOUJAS PWSS,SM/12506 |
New |
Contai Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Junior Engineer,Sri Sukanta Mondal, JE/Haldia Electrical Sub-Division. |
13/09/2022 |
27/04/2023 |
31/12/2025 |
29/12/2025 |
18 |
2,037 |
788.16 |
374.85 |
40 |
48 |
| 232 |
Tamluk Division |
PURBA MEDINIPUR |
Deshopran |
PURBA MUKUNDAPUR AND ADJOINING MOUJAS PWSS,SM/12507 |
New |
Contai Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Junior Engineer,Sri Mrityunjoy Paria, JE/Haldia Electrical Sub-Division. |
13/09/2022 |
21/07/2023 |
31/03/2025 |
29/12/2025 |
4 |
1,702 |
593.43 |
149.77 |
35 |
25 |
| 233 |
Tamluk Division |
PURBA MEDINIPUR |
Potashpur - I |
PALPARA AND ADJOINING MOUJAS PWSS,SM/12508 |
New |
Contai Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Junior Engineer,Sri Sukanta Mondal, JE/Haldia Electrical Sub-Division. |
13/09/2022 |
01/06/2023 |
31/12/2025 |
29/12/2025 |
6 |
2,861 |
754.82 |
166.70 |
10 |
22 |
| 234 |
Tamluk Division |
PURBA MEDINIPUR |
Egra - I |
MAHABISHRA AND IT'S ADJOINING MOUJAS PWSS ,SM/12510 |
New |
Digha Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Junior Engineer,Sri Mrityunjoy Paria, JE/Haldia Electrical Sub-Division. |
13/09/2022 |
11/07/2023 |
11/07/2025 |
29/12/2025 |
6 |
2,000 |
755.87 |
244.45 |
60 |
32 |
| 235 |
Tamluk Division |
PURBA MEDINIPUR |
Potashpur - II |
TUPCHIBAR AND IT'S ADJOINING MOUJAS PWSS,SM/12511 |
New |
Contai Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Sri Sukanta Mondal, JE/Haldia Electrical Sub-Division. |
13/09/2022 |
11/07/2023 |
11/07/2025 |
29/12/2025 |
6 |
1,138 |
524.62 |
136.86 |
70 |
26 |
| 236 |
Tamluk Division |
PURBA MEDINIPUR |
Moyna |
SRIKANTHA AND ADJOINING MOUJAS PWSS ,SM/12512 |
New |
Haldia Electrical Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Sri Krishanu Mondal, JE/Haldia Electrical Sub-Division. |
13/09/2022 |
16/08/2023 |
31/12/2025 |
29/12/2025 |
6 |
2,575 |
756.99 |
183.95 |
40 |
24 |
| 237 |
Tamluk Division |
PURBA MEDINIPUR |
Potashpur - II |
KSHETRAPAL AND IT'S ADJOINING MOUJAS,SM/12513 |
New |
Contai Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Sri Sukanta Mondal, JE/Haldia Electrical Sub-Division. |
13/09/2022 |
11/07/2023 |
11/07/2025 |
29/12/2025 |
8 |
1,880 |
695.17 |
299.56 |
10 |
43 |
| 238 |
Tamluk Division |
PURBA MEDINIPUR |
Ramnagar - I |
KAINARA & IT'S ADJOING MOUJAS,SM/12514 |
New |
Digha Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Junior Engineer,Sri Mrityunjoy Paria, JE/Haldia Electrical Sub-Division. |
13/09/2022 |
11/07/2023 |
11/07/2025 |
29/12/2025 |
7 |
2,233 |
784.60 |
461.78 |
70 |
59 |
| 239 |
Tamluk Division |
PURBA MEDINIPUR |
Moyna |
DKSHIM ANKHA & IT'S ADJOINING MOUJAS,SM/12515 |
New |
Tamluk Sadar Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Junior Engineer,Sri Krishanu Mondal, JE/Haldia Electrical Sub-Division. |
13/09/2022 |
27/04/2023 |
31/12/2025 |
29/12/2025 |
21 |
1,635 |
657.71 |
387.74 |
35 |
59 |
| 240 |
Tamluk Division |
PURBA MEDINIPUR |
Egra - II |
MIRJAPUR AND IT'S ADJOINING MOUJAS,SM/12516 |
New |
Digha Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Junior Engineer,Sri Sukanta Mondal, JE/Haldia Electrical Sub-Division. |
13/09/2022 |
28/04/2023 |
31/03/2025 |
29/12/2025 |
10 |
1,035 |
515.17 |
110.51 |
45 |
21 |
| 241 |
Tamluk Division |
PURBA MEDINIPUR |
Contai - I |
NAYAPUT AND IT'S ADJOINING MOUJAS PWSS,SM/12517 |
New |
Contai Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Junior Engineer,Sri Mrityunjoy Paria, JE/Haldia Electrical Sub-Division. |
13/09/2022 |
25/07/2023 |
31/03/2025 |
29/12/2025 |
6 |
2,007 |
743.40 |
275.23 |
80 |
37 |
| 242 |
Tamluk Division |
PURBA MEDINIPUR |
Potashpur - I |
SELMABAD AND ADJOINING MOUJAS PWSS,SM/12518 |
New |
Contai Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Junior Engineer,Sri Sukanta Mondal, JE/Haldia Electrical Sub-Division. |
13/09/2022 |
11/07/2023 |
11/07/2025 |
29/12/2025 |
5 |
2,717 |
757.80 |
168.33 |
15 |
22 |
| 243 |
Tamluk Division |
PURBA MEDINIPUR |
Contai - I |
Ground Water Based Contai Saline Area (Zone-III) (Phase-A) PWSS to Accommodate FHTC in Contai-I & III Block under Contai Sub-Division of Tamluk Division in Purba Medinipur District.,SM/12570 |
Augmentation |
Contai Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Junior Engineer,Sri Mrityunjoy Paria, JE/Haldia Electrical Sub-Division. |
14/09/2022 |
09/12/2022 |
31/12/2025 |
29/12/2025 |
10 |
7,341 |
1,708.39 |
1,201.37 |
60 |
70 |
| 244 |
Tamluk Division |
PURBA MEDINIPUR |
Moyna |
KIARANA AND ADJOINING MOUJAS PWSS,SM/12628 |
New |
Haldia Electrical Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Sri Krishanu Mondal, JE/Haldia Electrical Sub-Division. |
19/09/2022 |
16/08/2023 |
31/03/2025 |
29/12/2025 |
6 |
1,424 |
710.87 |
433.43 |
20 |
61 |
| 245 |
Tamluk Division |
PURBA MEDINIPUR |
Egra - I |
AMDAI AND ADJOINING MOUJAS PWSS at Egra-I Block.,SM/12634 |
New |
Digha Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Junior Engineer,Sri Mrityunjoy Paria, JE/Haldia Electrical Sub-Division. |
19/09/2022 |
11/07/2023 |
11/07/2025 |
29/12/2025 |
6 |
1,062 |
503.60 |
123.87 |
60 |
25 |
| 246 |
Tamluk Division |
PURBA MEDINIPUR |
Potashpur - I |
BELDA AND IT'S ADJOINING MOUJAS PWSS,SM/12710 |
New |
Contai Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Junior Engineer,Sri Sukanta Mondal, JE/Haldia Electrical Sub-Division. |
20/09/2022 |
11/07/2023 |
11/07/2025 |
29/12/2025 |
4 |
2,385 |
699.88 |
210.13 |
65 |
30 |
| 247 |
Tamluk Division |
PURBA MEDINIPUR |
Potashpur - II |
GABARDHANPUR AND IT'S ADJOINING MOUJAS PWSS,SM/12774 |
New |
Contai Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Sri Sukanta Mondal, JE/Haldia Electrical Sub-Division. |
20/09/2022 |
11/07/2023 |
11/07/2025 |
29/12/2025 |
7 |
1,680 |
676.58 |
162.43 |
15 |
24 |
| 248 |
Tamluk Division |
PURBA MEDINIPUR |
Sahid Matangini |
SOYA DIGHI AND IT'S ADJOINING MOUJAS,SM/12809 |
New |
Tamluk Sadar Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Junior Engineer,Sri Raju Pramanik, JE/Haldia Electrical Sub-Division. |
20/09/2022 |
02/05/2023 |
31/03/2025 |
29/12/2025 |
5 |
1,914 |
554.17 |
96.42 |
40 |
17 |
| 249 |
Tamluk Division |
PURBA MEDINIPUR |
Moyna |
GOJINA AND IT'S ADJOINING MOUJAS PWSS,SM/12812 |
New |
Haldia Electrical Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Sri Krishanu Mondal, JE/Haldia Electrical Sub-Division. |
20/09/2022 |
16/08/2023 |
31/12/2025 |
29/12/2025 |
7 |
2,437 |
766.35 |
425.11 |
75 |
55 |
| 250 |
Tamluk Division |
PURBA MEDINIPUR |
Khejuri - I |
JAHANABAD AND IT'S ADJOINING MOUJAS,SM/12813 |
New |
Contai Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Junior Engineer,Sri Krishanu Mondal, JE/Haldia Electrical Sub-Division. |
20/09/2022 |
12/07/2023 |
31/12/2025 |
29/12/2025 |
5 |
2,411 |
974.08 |
386.69 |
30 |
40 |
| 251 |
Tamluk Division |
PURBA MEDINIPUR |
Egra - I |
KIA AND IT'S ADJOINING MOUJAS,SM/12814 |
New |
Digha Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Junior Engineer,Sri Mrityunjoy Paria, JE/Haldia Electrical Sub-Division. |
20/09/2022 |
11/07/2023 |
11/07/2025 |
29/12/2025 |
6 |
1,897 |
720.10 |
309.49 |
60 |
43 |
| 252 |
Tamluk Division |
PURBA MEDINIPUR |
Khejuri - I |
KATARI AND ADJOINING MOUJAS PWSS,SM/12815 |
New |
Contai Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Junior Engineer,Sri Krishanu Mondal, JE/Haldia Electrical Sub-Division. |
20/09/2022 |
12/07/2023 |
31/12/2025 |
29/12/2025 |
8 |
767 |
416.52 |
193.22 |
95 |
46 |
| 253 |
Tamluk Division |
PURBA MEDINIPUR |
Mahisadal |
BARAMRIT BERE AND IT'S ADJOINING MOUJAS PWSS,SM/12816 |
New |
Haldia Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Junior Engineer,Sri Krishanu Mondal, JE/Haldia Electrical Sub-Division. |
20/09/2022 |
07/06/2023 |
31/03/2025 |
29/12/2025 |
8 |
1,500 |
600.38 |
345.61 |
35 |
58 |
| 254 |
Tamluk Division |
PURBA MEDINIPUR |
Deshopran |
DURMUT AND ADJOINING MOUJAS PWSS,SM/12820 |
New |
Contai Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Junior Engineer,Sri Mrityunjoy Paria, JE/Haldia Electrical Sub-Division. |
20/09/2022 |
11/07/2023 |
11/07/2025 |
29/12/2025 |
4 |
1,698 |
690.44 |
66.73 |
15 |
10 |
| 255 |
Tamluk Division |
PURBA MEDINIPUR |
Khejuri - II |
HALUD BARI AND ADJOINING MOUJAS,SM/12821 |
New |
Contai Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Junior Engineer,Sri Krishanu Mondal, JE/Haldia Electrical Sub-Division. |
20/09/2022 |
04/05/2023 |
31/03/2025 |
29/12/2025 |
5 |
2,543 |
728.00 |
525.60 |
40 |
72 |
| 256 |
Tamluk Division |
PURBA MEDINIPUR |
Potashpur - II |
BARMUNDA AND IT'S ADJOINING MOUJAS PWSS,SM/12878 |
New |
Contai Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Junior Engineer,Sri Sukanta Mondal, JE/Haldia Electrical Sub-Division. |
23/09/2022 |
25/07/2023 |
31/12/2025 |
29/12/2025 |
7 |
1,527 |
721.18 |
36.61 |
62 |
5 |
| 257 |
Tamluk Division |
PURBA MEDINIPUR |
Contai - I |
SYAMRAIBAR AND IT'S ADJOINING MOUJAS PWSS,SM/12886 |
New |
Contai Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Junior Engineer,Sri Mrityunjoy Paria, JE/Haldia Electrical Sub-Division. |
23/09/2022 |
16/08/2023 |
31/12/2025 |
29/12/2025 |
4 |
1,045 |
531.79 |
326.74 |
10 |
61 |
| 258 |
Tamluk Division |
PURBA MEDINIPUR |
Egra - I |
JUMKI AND ADJOINING MOUJAS PWSS,SM/12995 |
New |
Digha Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Junior Engineer,Sri Mrityunjoy Paria, JE/Haldia Electrical Sub-Division. |
28/09/2022 |
11/07/2023 |
11/07/2025 |
29/12/2025 |
5 |
1,636 |
620.99 |
285.02 |
65 |
46 |
| 259 |
Tamluk Division |
PURBA MEDINIPUR |
Ramnagar - I |
Retrofitting to Accommodate FHTC under JJM in Ranisai PWSS under Ramnagar-I Block (Phase-III),SM/13238 |
Retrofitting |
Digha Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Junior Engineer,Sri Mrityunjoy Paria, JE/Haldia Electrical Sub-Division. |
14/10/2022 |
07/06/2023 |
31/12/2025 |
29/12/2025 |
6 |
364 |
143.18 |
64.70 |
45 |
45 |
| 260 |
Tamluk Division |
PURBA MEDINIPUR |
|
Supply, Delivery and Installation of Desktop Computer, UPS, Scanner, printer etc. through GeM portal for Office of the Executive Engineer under Tamluk Division, PHE Dte.,SM/13369 |
Support |
|
|
|
19/10/2022 |
10/01/2023 |
31/03/2024 |
05/10/2023 |
22 |
0 |
56.79 |
15.55 |
20 |
27 |
| 261 |
Tamluk Division |
PURBA MEDINIPUR |
Ramnagar - II |
ISLAMPUR & IT'S ADJOINING MOUJAS PWSS,SM/13683 |
New |
Digha Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Junior Engineer,Sri Mrityunjoy Paria, JE/Haldia Electrical Sub-Division. |
14/11/2022 |
12/05/2023 |
31/12/2025 |
29/12/2025 |
13 |
2,111 |
710.43 |
319.00 |
25 |
45 |
| 262 |
Tamluk Division |
PURBA MEDINIPUR |
Deshopran |
PURBA MAHAMMADPUR & IT'S ADJOINING MOUJAS,SM/13686 |
New |
Contai Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Junior Engineer,Sri Mrityunjoy Paria, JE/Haldia Electrical Sub-Division. |
14/11/2022 |
21/07/2023 |
31/12/2025 |
29/12/2025 |
6 |
1,135 |
520.05 |
206.20 |
60 |
40 |
| 263 |
Tamluk Division |
PURBA MEDINIPUR |
Ramnagar - I |
FATEPUR AND ADJOINING MOUJAS PWSS,SM/13687 |
New |
Digha Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Junior Engineer,Sri Mrityunjoy Paria, JE/Haldia Electrical Sub-Division. |
14/11/2022 |
20/04/2023 |
31/12/2025 |
29/12/2025 |
6 |
377 |
231.00 |
88.39 |
75 |
38 |
| 264 |
Tamluk Division |
PURBA MEDINIPUR |
Mahisadal |
SAR BERYA AND ADJOINING MOUJAS PWSS,SM/13688 |
New |
Haldia Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Junior Engineer,Sri Krishanu Mondal, JE/Haldia Electrical Sub-Division. |
14/11/2022 |
01/03/2023 |
31/12/2025 |
29/12/2025 |
11 |
875 |
479.68 |
260.32 |
95 |
54 |
| 265 |
Tamluk Division |
PURBA MEDINIPUR |
Contai - I |
SAHAJADAPUR & IT'S ADJOINING MOUJAS PWSS,SM/13690 |
New |
Contai Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Junior Engineer,Sri Mrityunjoy Paria, JE/Haldia Electrical Sub-Division. |
14/11/2022 |
16/08/2023 |
31/12/2025 |
29/12/2025 |
6 |
695 |
464.83 |
136.51 |
40 |
29 |
| 266 |
Tamluk Division |
PURBA MEDINIPUR |
Contai - I |
RAGHUSARDAR BAR JALPAI & IT'S ADJOINING MOUJAS PWSS,SM/13691 |
New |
Contai Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Junior Engineer,Sri Mrityunjoy Paria, JE/Haldia Electrical Sub-Division. |
14/11/2022 |
16/08/2023 |
31/12/2025 |
29/12/2025 |
5 |
985 |
571.07 |
299.30 |
10 |
52 |
| 267 |
Tamluk Division |
PURBA MEDINIPUR |
Contai - I |
KAPASDA & IT'S ADJOINING MOUJAS PWSS,SM/13692 |
New |
Contai Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Junior Engineer,Sri Mrityunjoy Paria, JE/Haldia Electrical Sub-Division. |
14/11/2022 |
12/05/2023 |
31/03/2025 |
29/12/2025 |
5 |
1,475 |
778.74 |
180.01 |
35 |
23 |
| 268 |
Tamluk Division |
PURBA MEDINIPUR |
Potashpur - I |
CHANDPUR AND ADJOINING MOUJAS PWSS,SM/13693 |
New |
Contai Sub-Division |
Assistant Engineer |
Junior Engineer,Sri Krishanu Mondal, JE/Haldia Electrical Sub-Division.,Sri Sukanta Mondal, JE/Haldia Electrical Sub-Division. |
14/11/2022 |
11/07/2023 |
11/07/2025 |
29/12/2025 |
2 |
1,358 |
613.46 |
165.51 |
30 |
27 |
| 269 |
Tamluk Division |
PURBA MEDINIPUR |
Ramnagar - II |
KALAPUNJA & IT'S ADJOINING MOUJAS PWSS,SM/13694 |
New |
Digha Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Junior Engineer,Sri Mrityunjoy Paria, JE/Haldia Electrical Sub-Division. |
14/11/2022 |
12/07/2023 |
31/12/2025 |
29/12/2025 |
7 |
1,365 |
625.23 |
304.51 |
70 |
49 |
| 270 |
Tamluk Division |
PURBA MEDINIPUR |
Sutahata |
MOHANPUR AND IT'S ADJOINING MOUJAS PWSS,SM/13695 |
New |
Haldia Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Junior Engineer,Sri Tanmoy Shee, JE/Haldia Electrical Sub-Division. |
14/11/2022 |
11/05/2023 |
31/12/2025 |
29/12/2025 |
12 |
1,991 |
719.90 |
231.10 |
10 |
32 |
| 271 |
Tamluk Division |
PURBA MEDINIPUR |
Egra - I |
BARTTANA & IT'S ADJOINING MOUJAS PWSS,SM/13697 |
New |
Digha Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Junior Engineer,Sri Mrityunjoy Paria, JE/Haldia Electrical Sub-Division. |
14/11/2022 |
11/07/2023 |
11/07/2025 |
29/12/2025 |
6 |
1,639 |
695.93 |
324.18 |
45 |
47 |
| 272 |
Tamluk Division |
PURBA MEDINIPUR |
Sutahata |
URDDHABMAL AND ADJOINING MOUJAS PWSS,SM/13698 |
New |
Tamluk Sadar Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Junior Engineer,Sri Tanmoy Shee, JE/Haldia Electrical Sub-Division. |
14/11/2022 |
11/05/2023 |
31/12/2025 |
29/12/2025 |
20 |
1,797 |
803.45 |
319.51 |
78 |
40 |
| 273 |
Tamluk Division |
PURBA MEDINIPUR |
Bhagawanpur - I |
PASCHIM BAR AND IT'S ADJOINING MOUJAS PWSS,SM/13699 |
New |
Contai Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Junior Engineer,Sri Sukanta Mondal, JE/Haldia Electrical Sub-Division. |
14/11/2022 |
04/05/2023 |
31/12/2025 |
29/12/2025 |
7 |
3,181 |
1,097.22 |
682.23 |
45 |
62 |
| 274 |
Tamluk Division |
PURBA MEDINIPUR |
Egra - II |
Augmentation of Ground Water Based Piped Water Supply Scheme for Paniparul Zone-II,SM/13716 |
Augmentation |
Digha Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Junior Engineer,Sri Sukanta Mondal, JE/Haldia Electrical Sub-Division. |
17/11/2022 |
19/01/2023 |
31/12/2025 |
29/12/2025 |
11 |
3,882 |
1,060.08 |
597.45 |
20 |
56 |
| 275 |
Tamluk Division |
PURBA MEDINIPUR |
Contai - I |
MUKUNDAPUR & IT'S ADJOINING MOUJAS PWSS,SM/13740 |
New |
Contai Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Junior Engineer,Sri Mrityunjoy Paria, JE/Haldia Electrical Sub-Division. |
17/11/2022 |
16/08/2023 |
31/12/2025 |
29/12/2025 |
5 |
1,327 |
669.57 |
285.64 |
15 |
43 |
| 276 |
Tamluk Division |
PURBA MEDINIPUR |
Ramnagar - I |
NILKANTHAPUR & IT'S ADJOINING MOUJAS PWSS,SM/13741 |
New |
Digha Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Junior Engineer,Sri Mrityunjoy Paria, JE/Haldia Electrical Sub-Division. |
17/11/2022 |
11/07/2023 |
11/07/2025 |
29/12/2025 |
5 |
580 |
357.16 |
164.67 |
35 |
46 |
| 277 |
Tamluk Division |
PURBA MEDINIPUR |
Ramnagar - II |
BHUIANJIBAR AND IT'S ADJOINING MOUJAS PWSS,SM/13742 |
New |
Digha Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Junior Engineer,Sri Mrityunjoy Paria, JE/Haldia Electrical Sub-Division. |
17/11/2022 |
08/06/2023 |
31/12/2025 |
29/12/2025 |
6 |
1,517 |
694.60 |
487.75 |
65 |
70 |
| 278 |
Tamluk Division |
PURBA MEDINIPUR |
Potashpur - II |
KHAR & IT'S ADJOINING MOUJAS PWSS,SM/13743 |
New |
Contai Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Sri Sukanta Mondal, JE/Haldia Electrical Sub-Division. |
17/11/2022 |
11/07/2023 |
11/07/2025 |
29/12/2025 |
7 |
2,849 |
987.25 |
57.80 |
70 |
6 |
| 279 |
Tamluk Division |
PURBA MEDINIPUR |
Ramnagar - II |
DEULI & IT'S ADJOINING MOUJAS PWSS,SM/13744 |
New |
Digha Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Junior Engineer,Sri Mrityunjoy Paria, JE/Haldia Electrical Sub-Division. |
17/11/2022 |
08/06/2023 |
31/12/2025 |
29/12/2025 |
7 |
1,586 |
725.58 |
462.38 |
20 |
64 |
| 280 |
Tamluk Division |
PURBA MEDINIPUR |
Potashpur - II |
MATHURA AND IT'S ADJOINING MOUJAS PWSS,SM/13745 |
New |
Contai Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Sri Sukanta Mondal, JE/Haldia Electrical Sub-Division. |
17/11/2022 |
11/07/2023 |
11/07/2025 |
29/12/2025 |
6 |
2,170 |
732.18 |
195.37 |
10 |
27 |
| 281 |
Tamluk Division |
PURBA MEDINIPUR |
Ramnagar - I |
BISWANATHPUR PIPED WATER SUPPLY SCHEME.,SM/13850 |
New |
Contai Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Sri Mrityunjoy Paria, JE/Haldia Electrical Sub-Division. |
25/11/2022 |
20/04/2023 |
31/12/2025 |
29/12/2025 |
5 |
230 |
179.48 |
100.92 |
75 |
56 |
| 282 |
Tamluk Division |
PURBA MEDINIPUR |
Mahisadal |
BAKSHI CHAK SVS PIPED WATER SUPPLY SCHEME.,SM/13851 |
New |
Haldia Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Junior Engineer,Sri Krishanu Mondal, JE/Haldia Electrical Sub-Division. |
25/11/2022 |
20/04/2023 |
31/12/2025 |
29/12/2025 |
7 |
249 |
167.94 |
66.17 |
60 |
39 |
| 283 |
Tamluk Division |
PURBA MEDINIPUR |
Tamluk |
AJANGECHHYA PIPED WATER SUPPLY SCHEME.,SM/13852 |
New |
Tamluk Sadar Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Junior Engineer,Sri Raju Pramanik, JE/Haldia Electrical Sub-Division. |
25/11/2022 |
13/04/2023 |
31/12/2025 |
29/12/2025 |
4 |
314 |
166.59 |
41.55 |
45 |
25 |
| 284 |
Tamluk Division |
PURBA MEDINIPUR |
Contai - I |
PASCHIM RASULPUR AND IT'S ADJOINING MOUJAS,SM/13853 |
New |
Contai Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Junior Engineer,Sri Mrityunjoy Paria, JE/Haldia Electrical Sub-Division. |
25/11/2022 |
16/08/2023 |
31/12/2025 |
29/12/2025 |
3 |
1,023 |
507.49 |
45.05 |
15 |
9 |
| 285 |
Tamluk Division |
PURBA MEDINIPUR |
Contai - I |
BAGURAN JALPAI AND IT'S ADJOINING MOUJAS,SM/13854 |
New |
Contai Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Junior Engineer,Sri Mrityunjoy Paria, JE/Haldia Electrical Sub-Division. |
25/11/2022 |
16/08/2023 |
31/12/2025 |
29/12/2025 |
6 |
1,503 |
749.32 |
480.77 |
60 |
64 |
| 286 |
Tamluk Division |
PURBA MEDINIPUR |
Ramnagar - II |
UTTAR GOPALPUR AND ADJOINING MOUJAS PWSS,SM/13855 |
New |
Digha Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Junior Engineer,Sri Mrityunjoy Paria, JE/Haldia Electrical Sub-Division. |
25/11/2022 |
11/05/2023 |
31/12/2025 |
29/12/2025 |
14 |
1,908 |
786.94 |
479.42 |
75 |
61 |
| 287 |
Tamluk Division |
PURBA MEDINIPUR |
Sutahata |
SIMULBERYA AND ITS ADJOINING MOUJAS PWSS,SM/13856 |
New |
Tamluk Sadar Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Junior Engineer,Sri Tanmoy Shee, JE/Haldia Electrical Sub-Division. |
25/11/2022 |
01/06/2023 |
31/12/2025 |
29/12/2025 |
11 |
477 |
227.92 |
77.29 |
20 |
34 |
| 288 |
Tamluk Division |
PURBA MEDINIPUR |
Potashpur - II |
NONAKOURDA AND IT'S ADJOINING MOUJAS,SM/13857 |
New |
Contai Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Junior Engineer,Sri Sukanta Mondal, JE/Haldia Electrical Sub-Division. |
25/11/2022 |
11/07/2023 |
11/07/2025 |
29/12/2025 |
6 |
1,018 |
428.88 |
82.33 |
15 |
19 |
| 289 |
Tamluk Division |
PURBA MEDINIPUR |
Contai - III |
MASHAGON AND ITS ADJOINING MOUJAS PWSS,SM/13883 |
New |
Contai Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Junior Engineer,Sri Sukanta Mondal, JE/Haldia Electrical Sub-Division. |
25/11/2022 |
25/07/2023 |
31/12/2025 |
29/12/2025 |
4 |
401 |
204.23 |
3.70 |
15 |
2 |
| 290 |
Tamluk Division |
PURBA MEDINIPUR |
Moyna |
GOURANGA CHAK AND ADJOINING MOUJAS PWSS,SM/13884 |
New |
Haldia Electrical Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Sri Krishanu Mondal, JE/Haldia Electrical Sub-Division. |
25/11/2022 |
16/08/2023 |
31/03/2025 |
29/12/2025 |
6 |
1,427 |
589.91 |
310.11 |
70 |
53 |
| 291 |
Tamluk Division |
PURBA MEDINIPUR |
Sahid Matangini |
BARAGECHA AND ADJOINING MOUJAS PWSS,SM/13885 |
New |
Tamluk Sadar Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Junior Engineer,Sri Raju Pramanik, JE/Haldia Electrical Sub-Division. |
25/11/2022 |
04/05/2023 |
31/12/2025 |
29/12/2025 |
4 |
785 |
461.96 |
82.98 |
50 |
18 |
| 292 |
Tamluk Division |
PURBA MEDINIPUR |
Contai - I |
POTA PAKURIA AND IT'S ADJOINING MOUJAS,SM/13886 |
New |
Contai Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Junior Engineer,Sri Mrityunjoy Paria, JE/Haldia Electrical Sub-Division. |
25/11/2022 |
16/08/2023 |
31/12/2025 |
29/12/2025 |
5 |
981 |
555.33 |
188.56 |
40 |
34 |
| 293 |
Tamluk Division |
PURBA MEDINIPUR |
Ramnagar - II |
BADALPUR AND IT'S ADJOINING MOUJAS,SM/13887 |
New |
Digha Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Junior Engineer,Sri Mrityunjoy Paria, JE/Haldia Electrical Sub-Division. |
25/11/2022 |
31/05/2023 |
31/03/2025 |
29/12/2025 |
7 |
635 |
381.66 |
274.31 |
90 |
72 |
| 294 |
Tamluk Division |
PURBA MEDINIPUR |
Sahid Matangini |
GULURI AND IT'S ADJOING MOUJAS ,SM/13888 |
New |
Tamluk Sadar Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Junior Engineer,Sri Raju Pramanik, JE/Haldia Electrical Sub-Division. |
25/11/2022 |
17/04/2023 |
31/12/2025 |
29/12/2025 |
8 |
1,376 |
533.49 |
142.52 |
18 |
27 |
| 295 |
Tamluk Division |
PURBA MEDINIPUR |
Contai - III |
Providing FHTC (Functional Household Tap Connection) with Augmentation of Murisai Water Supply Scheme ,SM/13889 |
Augmentation |
Contai Sub-Division |
Assistant Engineer |
Junior Engineer |
25/11/2022 |
01/08/2023 |
31/12/2025 |
29/12/2025 |
1 |
0 |
133.52 |
0.00 |
65 |
0 |
| 296 |
Tamluk Division |
PURBA MEDINIPUR |
Bhagawanpur - II |
ITA BARIA & ADJOINING MOUZAS,SM/14042 |
New |
Contai Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Junior Engineer,Sri Sukanta Mondal, JE/Haldia Electrical Sub-Division. |
12/12/2022 |
27/03/2023 |
31/12/2025 |
29/12/2025 |
14 |
2,068 |
934.72 |
485.26 |
40 |
52 |
| 297 |
Tamluk Division |
PURBA MEDINIPUR |
Haldia |
Augmentation of Ground Water Based Bar Sundara PWSS to Accommodate FHTC in Haldia Block under Haldia Sub-Division of Tamluk Division, in Purba Medinipur. ,SM/14113 |
Augmentation |
Haldia Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Junior Engineer,Sri Tanmoy Shee, JE/Haldia Electrical Sub-Division. |
02/01/2023 |
12/09/2022 |
31/12/2025 |
29/12/2025 |
14 |
5,920 |
1,300.67 |
868.13 |
40 |
67 |
| 298 |
Tamluk Division |
PURBA MEDINIPUR |
Deshopran |
BASANTIA AND IT'S ADJOINING MOUJAS PWSS,SM/14451 |
New |
Contai Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Junior Engineer,Sri Mrityunjoy Paria, JE/Haldia Electrical Sub-Division. |
20/01/2023 |
12/07/2023 |
31/03/2025 |
29/12/2025 |
5 |
1,581 |
525.09 |
141.27 |
45 |
27 |
| 299 |
Tamluk Division |
PURBA MEDINIPUR |
Egra - II |
BAINCHA AND IT'S ADJOINING MOUJAS PWSS,SM/14455 |
New |
Digha Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Junior Engineer,Sri Sukanta Mondal, JE/Haldia Electrical Sub-Division. |
20/01/2023 |
19/07/2023 |
31/03/2025 |
29/12/2025 |
5 |
700 |
412.43 |
189.69 |
25 |
46 |
| 300 |
Tamluk Division |
PURBA MEDINIPUR |
Ramnagar - I |
GHANTA SHALA AND IT'S ADJOINING MOUJAS PWSS,SM/14456 |
New |
Digha Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Junior Engineer,Sri Mrityunjoy Paria, JE/Haldia Electrical Sub-Division. |
20/01/2023 |
31/05/2023 |
31/03/2025 |
29/12/2025 |
6 |
672 |
351.84 |
220.73 |
90 |
63 |
| 301 |
Tamluk Division |
PURBA MEDINIPUR |
Potashpur - II |
KATNADIGHI AND IT'S ADJOINING MOUJAS PWSS,SM/14457 |
New |
Contai Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Junior Engineer,Sri Sukanta Mondal, JE/Haldia Electrical Sub-Division. |
20/01/2023 |
11/07/2023 |
11/07/2025 |
29/12/2025 |
6 |
570 |
317.67 |
69.11 |
10 |
22 |
| 302 |
Tamluk Division |
PURBA MEDINIPUR |
Potashpur - I |
KULRAKHI AND IT'S ADJOINING MOUJAS PWSS,SM/14671 |
New |
Contai Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Junior Engineer,Sri Sukanta Mondal, JE/Haldia Electrical Sub-Division. |
31/01/2023 |
11/07/2023 |
11/07/2025 |
29/12/2025 |
5 |
1,040 |
471.07 |
149.21 |
15 |
32 |
| 303 |
Tamluk Division |
PURBA MEDINIPUR |
Potashpur - I |
CHISTIPUR AND ADJOINING MOUJAS,SM/14672 |
New |
Contai Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Junior Engineer,Sri Sukanta Mondal, JE/Haldia Electrical Sub-Division. |
31/01/2023 |
25/07/2023 |
31/12/2025 |
29/12/2025 |
4 |
2,004 |
668.48 |
17.94 |
50 |
3 |
| 304 |
Tamluk Division |
PURBA MEDINIPUR |
Contai - I |
KASHI BHUIANBAR AND IT'S ADJOINING MOUJAS,SM/14673 |
New |
Contai Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Junior Engineer,Sri Mrityunjoy Paria, JE/Haldia Electrical Sub-Division. |
31/01/2023 |
16/08/2023 |
31/12/2025 |
29/12/2025 |
5 |
614 |
642.05 |
235.28 |
15 |
37 |
| 305 |
Tamluk Division |
PURBA MEDINIPUR |
Tamluk |
MURARI KALUA PWSS,SM/14693 |
New |
Tamluk Sadar Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Junior Engineer,Sri Raju Pramanik, JE/Haldia Electrical Sub-Division. |
31/01/2023 |
11/07/2023 |
11/07/2025 |
29/12/2025 |
2 |
425 |
236.53 |
0.00 |
65 |
0 |
| 306 |
Tamluk Division |
PURBA MEDINIPUR |
Contai - III |
JAMUASHANKARPUR PWSS,SM/14694 |
New |
Contai Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Junior Engineer,Sri Sukanta Mondal, JE/Haldia Electrical Sub-Division. |
31/01/2023 |
25/07/2023 |
31/12/2025 |
29/12/2025 |
4 |
312 |
344.23 |
17.86 |
20 |
5 |
| 307 |
Tamluk Division |
PURBA MEDINIPUR |
Tamluk |
SATKALUA AND IT'S ADJOINING MOUJAS PWSS,SM/14695 |
New |
Tamluk Sadar Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Junior Engineer,Sri Raju Pramanik, JE/Haldia Electrical Sub-Division. |
31/01/2023 |
04/05/2023 |
31/12/2025 |
29/12/2025 |
4 |
816 |
374.28 |
142.51 |
25 |
38 |
| 308 |
Tamluk Division |
PURBA MEDINIPUR |
Tamluk |
PURBA NUKHA AND ADJOINING MOUJAS,SM/14742 |
New |
Tamluk Sadar Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Junior Engineer,Sri Raju Pramanik, JE/Haldia Electrical Sub-Division. |
31/01/2023 |
19/07/2023 |
31/12/2025 |
29/12/2025 |
7 |
2,344 |
668.28 |
165.24 |
25 |
25 |
| 309 |
Tamluk Division |
PURBA MEDINIPUR |
Ramnagar - II |
DAKSHIN KALYANPUR AND IT'S ADJOINING MOUJAS PWSS,SM/14745 |
New |
Digha Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Junior Engineer,Sri Mrityunjoy Paria, JE/Haldia Electrical Sub-Division. |
31/01/2023 |
11/07/2023 |
11/07/2025 |
29/12/2025 |
7 |
236 |
216.70 |
93.48 |
10 |
43 |
| 310 |
Tamluk Division |
PURBA MEDINIPUR |
Deshopran |
MAHISHAGOT AND IT'S ADJOINING MOUJAS PWSS,SM/14749 |
New |
Contai Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Junior Engineer,Sri Mrityunjoy Paria, JE/Haldia Electrical Sub-Division. |
31/01/2023 |
25/07/2023 |
31/12/2025 |
29/12/2025 |
4 |
425 |
342.28 |
31.26 |
15 |
9 |
| 311 |
Tamluk Division |
PURBA MEDINIPUR |
Egra - I |
Piped Water Supply Scheme for Chirulia-Chatla Zone-3,SM/14836 |
Augmentation |
Digha Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Junior Engineer,Sri Mrityunjoy Paria, JE/Haldia Electrical Sub-Division. |
03/02/2023 |
08/06/2023 |
31/12/2025 |
29/12/2025 |
7 |
210 |
391.40 |
90.57 |
65 |
23 |
| 312 |
Tamluk Division |
PURBA MEDINIPUR |
Ramnagar - I |
Different Works for Providing Functional Household TAP Connection (FHTC) by Augmentation of Digha (Central) Water Supply Scheme.,SM/14837 |
Augmentation |
Digha Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Junior Engineer,Sri Mrityunjoy Paria, JE/Haldia Electrical Sub-Division. |
03/02/2023 |
11/07/2023 |
11/07/2025 |
29/12/2025 |
8 |
2,069 |
704.17 |
252.65 |
35 |
36 |
| 313 |
Tamluk Division |
PURBA MEDINIPUR |
Egra - II |
Piped Water Supply Scheme for Bathuari Zone-I,SM/14839 |
Augmentation |
Digha Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Junior Engineer,Sri Sukanta Mondal, JE/Haldia Electrical Sub-Division. |
03/02/2023 |
11/07/2023 |
11/07/2025 |
29/12/2025 |
5 |
23 |
181.49 |
87.07 |
35 |
48 |
| 314 |
Tamluk Division |
PURBA MEDINIPUR |
Egra - I |
Piped Water Supply Scheme for Chirulia-Chatla Zone-2,SM/14840 |
Augmentation |
Digha Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Junior Engineer,Sri Mrityunjoy Paria, JE/Haldia Electrical Sub-Division. |
03/02/2023 |
12/05/2023 |
31/12/2025 |
29/12/2025 |
3 |
27 |
154.51 |
64.07 |
20 |
41 |
| 315 |
Tamluk Division |
PURBA MEDINIPUR |
Ramnagar - II |
PIPED WATER SUPPLY SCHEME FOR KANPUR ZONE-I,SM/14841 |
Augmentation |
Digha Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Junior Engineer,Sri Ujjal Kumar Dey, JE/Haldia Electrical Sub-Division. |
03/02/2023 |
11/07/2023 |
11/07/2025 |
29/12/2025 |
6 |
69 |
207.52 |
63.23 |
25 |
30 |
| 316 |
Tamluk Division |
PURBA MEDINIPUR |
Ramnagar - I |
Piped Water Supply Scheme for Sankarpur Zone-II,SM/14842 |
Augmentation |
Digha Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Junior Engineer,Sri Ujjal Kumar Dey, JE/Haldia Electrical Sub-Division. |
03/02/2023 |
20/04/2023 |
31/12/2025 |
29/12/2025 |
3 |
197 |
70.89 |
18.43 |
10 |
26 |
| 317 |
Tamluk Division |
PURBA MEDINIPUR |
Deshopran |
1 (One) No. Boosting Tube Well for Source Augmentation of Bamunia Water Supply Scheme of Contai-II (Deshpran) Block under Contai Sub-Division of Tamluk Division, PHE Dte. within Purba Medinipur District. ,SM/14843 |
Augmentation |
Haldia Electrical Sub-Division |
Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Sri Mrityunjoy Paria, JE/Haldia Electrical Sub-Division. |
03/02/2023 |
05/06/2023 |
31/12/2025 |
29/12/2025 |
6 |
0 |
63.12 |
20.19 |
40 |
32 |
| 318 |
Tamluk Division |
PURBA MEDINIPUR |
Contai - I |
1 (One) No. Boosting Tube Well for Source Augmentation of Silampur Water Supply Scheme of Contai-I Block under Contai Sub-Division of Tamluk Division, PHE Dte. within Purba Medinipur District. ,SM/14844 |
Augmentation |
Contai Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Junior Engineer,Sri Mrityunjoy Paria, JE/Haldia Electrical Sub-Division. |
03/02/2023 |
06/04/2023 |
31/12/2025 |
29/12/2025 |
8 |
0 |
62.78 |
37.59 |
25 |
60 |
| 319 |
Tamluk Division |
PURBA MEDINIPUR |
Khejuri - I |
Augmentation of Mukutshila Zone-II Water Supply Scheme with Allied Works & 1 No. Boosting Tube Well to Accommodate FHTC within Khejuri-I Block within Contai Sub-Division under Tamluk Division, PHE Dte. within the Purba Medinipur District.,SM/14845 |
Augmentation |
Contai Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Junior Engineer,Sri Mrityunjoy Paria, JE/Haldia Electrical Sub-Division. |
03/02/2023 |
01/03/2023 |
31/12/2025 |
29/12/2025 |
12 |
0 |
66.74 |
38.32 |
30 |
57 |
| 320 |
Tamluk Division |
PURBA MEDINIPUR |
Deshopran |
Augmentation of Contai Saline Area Zone-IV Part-I Piped Water Supply Scheme ,SM/15034 |
Augmentation |
Contai Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Junior Engineer,Sri Mrityunjoy Paria, JE/Haldia Electrical Sub-Division. |
04/02/2023 |
11/07/2023 |
11/07/2025 |
29/12/2025 |
4 |
1,807 |
635.84 |
23.49 |
15 |
4 |
| 321 |
Tamluk Division |
PURBA MEDINIPUR |
Egra - II |
Augmentation of Astichak (Zone-II) PWSS,SM/15035 |
Augmentation |
Digha Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Junior Engineer,Sri Sukanta Mondal, JE/Haldia Electrical Sub-Division. |
04/02/2023 |
11/07/2023 |
11/07/2025 |
29/12/2025 |
7 |
2,196 |
768.16 |
454.91 |
20 |
59 |
| 322 |
Tamluk Division |
PURBA MEDINIPUR |
Panskura |
3 (Three) Nos. Boosting Tube Well for Gobindanagar Water Supply Scheme of Panskura-I Block under Tamluk Sub-Division of Tamluk Division, PHE Dte. within Purba Medinipur District. ,SM/15036 |
Augmentation |
Tamluk Sadar Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Junior Engineer,Sri Raju Pramanik, JE/Haldia Electrical Sub-Division. |
04/02/2023 |
06/04/2023 |
31/12/2025 |
29/12/2025 |
12 |
0 |
242.53 |
115.33 |
50 |
48 |
| 323 |
Tamluk Division |
PURBA MEDINIPUR |
Tamluk |
TULIA AND ADJOINING MOUJAS PWSS,SM/15037 |
New |
Tamluk Sadar Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Junior Engineer,Sri Raju Pramanik, JE/Haldia Electrical Sub-Division. |
04/02/2023 |
01/06/2023 |
31/12/2025 |
29/12/2025 |
3 |
2,059 |
572.93 |
112.10 |
68 |
20 |
| 324 |
Tamluk Division |
PURBA MEDINIPUR |
Contai - I |
1 (One) No. Boosting Tube Well for Augmentation of Barchunfali Water Supply Scheme of Contai-I Block under Contai Sub-Division of Tamluk Division, PHE Dte. within Purba Medinipur District. ,SM/15038 |
Augmentation |
Contai Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Junior Engineer,Sri Mrityunjoy Paria, JE/Haldia Electrical Sub-Division. |
04/02/2023 |
06/04/2023 |
31/12/2025 |
29/12/2025 |
8 |
0 |
85.63 |
41.51 |
40 |
48 |
| 325 |
Tamluk Division |
PURBA MEDINIPUR |
Egra - II |
Augmentation of Astichak (Zone-I) PWSS,SM/15462 |
Augmentation |
Digha Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Junior Engineer,Sri Sukanta Mondal, JE/Haldia Electrical Sub-Division. |
04/02/2023 |
11/07/2023 |
11/07/2025 |
29/12/2025 |
7 |
1,291 |
679.21 |
35.80 |
40 |
5 |
| 326 |
Tamluk Division |
PURBA MEDINIPUR |
Potashpur - II |
CHAK BHABANI & ADJOINING MOUJAS PWSS,SM/15512 |
New |
Contai Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Sri Sukanta Mondal, JE/Haldia Electrical Sub-Division. |
16/02/2023 |
19/07/2023 |
31/12/2025 |
29/12/2025 |
7 |
2,843 |
1,095.47 |
655.41 |
15 |
60 |
| 327 |
Tamluk Division |
PURBA MEDINIPUR |
Egra - II |
DUBDA IT'S ADJOINING MOUJAS PWSS,SM/15513 |
New |
Digha Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Junior Engineer,Sri Sukanta Mondal, JE/Haldia Electrical Sub-Division. |
16/02/2023 |
31/07/2023 |
31/12/2025 |
29/12/2025 |
5 |
4,067 |
1,290.54 |
303.45 |
25 |
24 |
| 328 |
Tamluk Division |
PURBA MEDINIPUR |
Egra - I |
AILAN AND IT'S ADJOINING MOUJAS PWSS,SM/15514 |
New |
Digha Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Junior Engineer,Sri Mrityunjoy Paria, JE/Haldia Electrical Sub-Division. |
16/02/2023 |
11/07/2023 |
11/07/2025 |
29/12/2025 |
5 |
3,046 |
1,127.65 |
284.91 |
42 |
25 |
| 329 |
Tamluk Division |
PURBA MEDINIPUR |
Khejuri - II |
DEKHALI AND ADJOINING MOUJAS PWSS,SM/15515 |
New |
Contai Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Junior Engineer,Sri Krishanu Mondal, JE/Haldia Electrical Sub-Division. |
16/02/2023 |
04/05/2023 |
31/12/2025 |
29/12/2025 |
4 |
2,820 |
1,239.40 |
878.48 |
50 |
71 |
| 330 |
Tamluk Division |
PURBA MEDINIPUR |
Deshopran |
Augmentation of Ground Water Based Piped Water Supply Scheme for Amtalia Accommodate FHTC under Contai-II (Deshapran) Block within Purba Medinipur District. ,SM/15635 |
Augmentation |
Contai Sub-Division |
Assistant Engineer |
Junior Engineer |
20/02/2023 |
20/04/2023 |
31/12/2025 |
29/12/2025 |
1 |
0 |
58.07 |
55.82 |
35 |
96 |
| 331 |
Tamluk Division |
PURBA MEDINIPUR |
Ramnagar - II |
PIPED WATER SUPPLY SCHEME FOR KANPUR ZONE-III,SM/15841 |
Augmentation |
Digha Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Junior Engineer,Sri Mrityunjoy Paria, JE/Haldia Electrical Sub-Division. |
20/02/2023 |
11/07/2023 |
11/07/2025 |
29/12/2025 |
8 |
99 |
432.64 |
13.16 |
15 |
3 |
| 332 |
Tamluk Division |
PURBA MEDINIPUR |
Ramnagar - I |
JHAUGERYA PIPED WATER SUPPLY SCHEME.,SM/15842 |
New |
Digha Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Sri Ujjal Kumar Dey, JE/Haldia Electrical Sub-Division. |
20/02/2023 |
31/07/2023 |
31/12/2025 |
29/12/2025 |
4 |
158 |
179.26 |
99.79 |
65 |
56 |
| 333 |
Tamluk Division |
PURBA MEDINIPUR |
Egra - I |
Piped Water Supply Scheme for Chirulia-Chatla Zone-4,SM/15844 |
Augmentation |
Digha Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Junior Engineer,Sri Mrityunjoy Paria, JE/Haldia Electrical Sub-Division. |
20/02/2023 |
01/08/2023 |
31/12/2025 |
29/12/2025 |
5 |
173 |
444.01 |
2.89 |
25 |
1 |
| 334 |
Tamluk Division |
PURBA MEDINIPUR |
Egra - II |
Piped Water Supply Scheme for Bathuari Zone-IV,SM/15845 |
Augmentation |
Digha Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Junior Engineer,Sri Sukanta Mondal, JE/Haldia Electrical Sub-Division. |
20/02/2023 |
01/08/2023 |
31/12/2025 |
29/12/2025 |
7 |
48 |
428.01 |
38.03 |
5 |
9 |
| 335 |
Tamluk Division |
PURBA MEDINIPUR |
Ramnagar - I |
Piped Water Supply Scheme for Sankarpur Zone-III,SM/15846 |
Augmentation |
Digha Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Junior Engineer,Sri Mrityunjoy Paria, JE/Haldia Electrical Sub-Division. |
20/02/2023 |
01/08/2023 |
31/12/2025 |
29/12/2025 |
10 |
267 |
338.75 |
35.28 |
15 |
10 |
| 336 |
Tamluk Division |
PURBA MEDINIPUR |
Ramnagar - I |
Piped Water Supply Scheme for Sankarpur Zone-V,SM/15847 |
Augmentation |
Digha Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Junior Engineer,Sri Mrityunjoy Paria, JE/Haldia Electrical Sub-Division. |
20/02/2023 |
31/07/2023 |
31/12/2025 |
29/12/2025 |
8 |
321 |
342.52 |
92.95 |
25 |
27 |
| 337 |
Tamluk Division |
PURBA MEDINIPUR |
Bhagawanpur - II |
GARABAR PIPED WATER SUPPLY SCHEME.,SM/15850 |
New |
Contai Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Junior Engineer,Sri Sukanta Mondal, JE/Haldia Electrical Sub-Division. |
20/02/2023 |
10/03/2023 |
31/12/2025 |
29/12/2025 |
11 |
150 |
166.18 |
103.59 |
70 |
62 |
| 338 |
Tamluk Division |
PURBA MEDINIPUR |
Contai - I |
DESHHDUTTA BARH PIPED WATER SUPPLY SCHEME.,SM/15851 |
New |
Contai Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Junior Engineer,Sri Mrityunjoy Paria, JE/Haldia Electrical Sub-Division. |
20/02/2023 |
12/07/2023 |
31/12/2025 |
29/12/2025 |
5 |
250 |
74.90 |
70.82 |
25 |
95 |
| 339 |
Tamluk Division |
PURBA MEDINIPUR |
Egra - II |
Piped Water Supply Scheme for Bathuari Zone-II,SM/15853 |
Augmentation |
Digha Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Junior Engineer,Sri Sukanta Mondal, JE/Haldia Electrical Sub-Division. |
20/02/2023 |
01/08/2023 |
31/12/2025 |
29/12/2025 |
6 |
12 |
439.72 |
138.48 |
25 |
31 |
| 340 |
Tamluk Division |
PURBA MEDINIPUR |
Contai - III |
Augmentation of Contai Saline Area Zone-IV Part-III Piped Water Supply Scheme ,SM/16194 |
Augmentation |
Contai Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Junior Engineer,Sri Mrityunjoy Paria, JE/Haldia Electrical Sub-Division.,Sri Sukanta Mondal, JE/Haldia Electrical Sub-Division. |
24/02/2023 |
08/06/2023 |
31/12/2025 |
29/12/2025 |
8 |
1,427 |
730.61 |
210.27 |
20 |
29 |
| 341 |
Tamluk Division |
PURBA MEDINIPUR |
Egra - II |
BANCHBERA AND ITS ADJOINING MOUJAS PWSS,SM/16200 |
New |
Digha Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Junior Engineer,Sri Sukanta Mondal, JE/Haldia Electrical Sub-Division. |
23/02/2023 |
19/04/2023 |
31/12/2025 |
29/12/2025 |
5 |
147 |
197.46 |
157.71 |
20 |
80 |
| 342 |
Tamluk Division |
PURBA MEDINIPUR |
Egra - I |
BHATSALIA & IT'S ADJOINING MOUJAS PWSS,SM/16203 |
New |
Digha Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Junior Engineer,Sri Mrityunjoy Paria, JE/Haldia Electrical Sub-Division. |
23/02/2023 |
28/04/2023 |
31/12/2025 |
29/12/2025 |
7 |
337 |
166.63 |
99.98 |
10 |
60 |
| 343 |
Tamluk Division |
PURBA MEDINIPUR |
Nandigram - I |
1 (One) Nos. Boosting Tube Well for Tajpur Water Supply Scheme of Nandigram-I Block under Haldia Sub-Division of Tamluk Division, PHE Dte. within the Purba Medinipur District.,SM/16204 |
Augmentation |
Haldia Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Junior Engineer,Sri Tanmoy Shee, JE/Haldia Electrical Sub-Division. |
24/02/2023 |
06/04/2023 |
31/12/2025 |
29/12/2025 |
5 |
0 |
76.08 |
47.92 |
95 |
63 |
| 344 |
Tamluk Division |
PURBA MEDINIPUR |
Nandigram - I |
1 (One) Nos. Boosting Tube Well for Manikpur Water Supply Scheme of Nandigram-I Block under Haldia Sub-Division of Tamluk Division, PHE Dte. within the Purba Medinipur District.,SM/16205 |
Augmentation |
Haldia Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Junior Engineer,Sri Tanmoy Shee, JE/Haldia Electrical Sub-Division. |
24/02/2023 |
06/04/2023 |
31/12/2025 |
29/12/2025 |
8 |
0 |
75.38 |
48.81 |
40 |
65 |
| 345 |
Tamluk Division |
PURBA MEDINIPUR |
Nandigram - II |
1 (One) Nos. Boosting Tube Well for Jalpai Part-II Water Supply Scheme of Nandigram-II Block under Haldia Sub-Division of Tamluk Division, PHE Dte. within the Purba Medinipur District. ,SM/16206 |
Augmentation |
Haldia Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Junior Engineer,Sri Raju Pramanik, JE/Haldia Electrical Sub-Division. |
24/02/2023 |
08/12/2015 |
31/12/2025 |
29/12/2025 |
5 |
0 |
74.78 |
47.33 |
95 |
63 |
| 346 |
Tamluk Division |
PURBA MEDINIPUR |
Contai - I |
BATIPUR AND ADJOINING MOUJAS PIPED WATER SUPPLY SCHEME,SM/16257 |
New |
Contai Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Junior Engineer,Sri Mrityunjoy Paria, JE/Haldia Electrical Sub-Division. |
24/02/2023 |
08/06/2023 |
31/03/2025 |
29/12/2025 |
4 |
958 |
520.90 |
93.78 |
45 |
18 |
| 347 |
Tamluk Division |
PURBA MEDINIPUR |
Chandipur |
1 (One) Nos. Boosting Tube Well for Kotbar Water Supply Scheme of Chandipur Block under Tamluk Sub-Division of Tamluk Division, PHE Dte. within the Purba Medinipur District.,SM/16279 |
Augmentation |
Tamluk Sadar Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Junior Engineer,Sri Krishanu Mondal, JE/Haldia Electrical Sub-Division. |
24/02/2023 |
06/04/2023 |
31/12/2025 |
29/12/2025 |
4 |
0 |
80.74 |
29.86 |
10 |
37 |
| 348 |
Tamluk Division |
PURBA MEDINIPUR |
Egra - I |
Piped water Supply Scheme for Chirulia-Chatla Zone-1,SM/16284 |
Augmentation |
Digha Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Junior Engineer,Sri Mrityunjoy Paria, JE/Haldia Electrical Sub-Division. |
23/02/2023 |
08/06/2023 |
31/12/2025 |
29/12/2025 |
6 |
162 |
403.81 |
135.26 |
5 |
33 |
| 349 |
Tamluk Division |
PURBA MEDINIPUR |
Ramnagar - II |
PIPED WATER SUPPLY SCHEME FOR KANPUR-ZONE-IV,SM/16286 |
Augmentation |
Digha Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Junior Engineer,Sri Mrityunjoy Paria, JE/Haldia Electrical Sub-Division. |
23/02/2023 |
31/07/2023 |
31/12/2025 |
29/12/2025 |
9 |
209 |
461.03 |
246.89 |
10 |
54 |
| 350 |
Tamluk Division |
PURBA MEDINIPUR |
Ramnagar - I |
Different Works for Providing Functional Household TAP Connection (FHTC) by Augmentation of Digha (Western) Water Supply Scheme.,SM/16288 |
Augmentation |
Digha Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Junior Engineer,Sri Mrityunjoy Paria, JE/Haldia Electrical Sub-Division. |
23/02/2023 |
19/07/2023 |
31/12/2025 |
29/12/2025 |
5 |
782 |
522.20 |
171.87 |
5 |
33 |
| 351 |
Tamluk Division |
PURBA MEDINIPUR |
Egra - II |
Piped Water Supply Scheme for Bathuari Zone-III,SM/16300 |
Augmentation |
Digha Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Junior Engineer,Sri Sukanta Mondal, JE/Haldia Electrical Sub-Division. |
23/02/2023 |
01/08/2023 |
31/12/2025 |
29/12/2025 |
7 |
55 |
396.80 |
82.31 |
5 |
21 |
| 352 |
Tamluk Division |
PURBA MEDINIPUR |
Ramnagar - I |
Piped Water Supply Scheme for Sankarpur Zone-IV,SM/16305 |
Augmentation |
Digha Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Junior Engineer,Sri Mrityunjoy Paria, JE/Haldia Electrical Sub-Division. |
23/02/2023 |
31/07/2023 |
31/12/2025 |
29/12/2025 |
8 |
294 |
340.44 |
106.25 |
70 |
31 |
| 353 |
Tamluk Division |
PURBA MEDINIPUR |
Chandipur |
2 (Two) Nos. Boosting Tube Well for Habichak Water Supply Scheme of Chandipur Block under Tamluk Sub-Division of Tamluk Division, PHE Dte. within the Purba Medinipur District.,SM/16390 |
Augmentation |
Tamluk Sadar Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Junior Engineer,Sri Krishanu Mondal, JE/Haldia Electrical Sub-Division. |
28/02/2023 |
06/04/2023 |
31/12/2025 |
29/12/2025 |
7 |
0 |
161.69 |
95.61 |
40 |
59 |
| 354 |
Tamluk Division |
PURBA MEDINIPUR |
Moyna |
Balance Work for Retrofitting to Accommodate FHTC (610 Nos.) and laying of left-out portion UPVC pipe line due to uncovered area of this Zone at different Nodal Point under JJM in Dona Zone-I Water Supply Scheme for Block-Moyna in the District of Purba Me,SM/16452 |
Retrofitting |
Tamluk Sadar Sub-Division |
Assistant Engineer |
Junior Engineer |
03/03/2023 |
19/04/2023 |
31/12/2025 |
29/12/2025 |
2 |
610 |
110.15 |
79.22 |
79 |
72 |
| 355 |
Tamluk Division |
PURBA MEDINIPUR |
Bhagawanpur - II |
Retrofitting to Accommodate FHTC under JJM in Arjunnagar PWSS under Bhagwanpur-II Block (Phase-II) ,SM/16453 |
Retrofitting |
Contai Sub-Division |
Assistant Engineer |
Junior Engineer |
03/03/2023 |
08/06/2023 |
31/12/2025 |
29/12/2025 |
3 |
1,321 |
115.08 |
25.27 |
30 |
22 |
| 356 |
Tamluk Division |
PURBA MEDINIPUR |
Ramnagar - II |
RETROFITTING TO ACCOMMODATE FHTC UNDER JJM IN MANDARMANI PWSS UNDER RAMNAGAR-II BLOCK (PHASE-III),SM/16458 |
Augmentation |
Digha Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Junior Engineer,Sri Mrityunjoy Paria, JE/Haldia Electrical Sub-Division. |
03/03/2023 |
31/05/2023 |
31/12/2025 |
29/12/2025 |
4 |
675 |
170.20 |
10.80 |
15 |
6 |
| 357 |
Tamluk Division |
PURBA MEDINIPUR |
Egra - I |
RETROFITTING TO ACCOMMODATE FHTC UNDER JJM IN PANCHROL PWSS UNDER EGRA-I BLOCK (PHASE-II),SM/16460 |
Augmentation |
Digha Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Junior Engineer,Sri Mrityunjoy Paria, JE/Haldia Electrical Sub-Division. |
03/03/2023 |
19/04/2023 |
31/12/2025 |
29/12/2025 |
4 |
172 |
139.71 |
41.98 |
25 |
30 |
| 358 |
Tamluk Division |
PURBA MEDINIPUR |
Ramnagar - II |
RETROFITTING TO ACCOMMODATE FHTC UNDER JJM IN PALDUHI PWSS UNDER RAMNAGAR-II BLOCK (PHASE-II),SM/16461 |
Augmentation |
Digha Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Junior Engineer,Sri Mrityunjoy Paria, JE/Haldia Electrical Sub-Division. |
03/03/2023 |
17/05/2023 |
31/12/2025 |
29/12/2025 |
2 |
176 |
131.18 |
31.42 |
90 |
24 |
| 359 |
Tamluk Division |
PURBA MEDINIPUR |
Ramnagar - II |
RETROFITTING TO ACCOMMODATE FHTC UNDER JJM IN BHERIBARANGA PWSS UNDER RAMNAGAR-II BLOCK (PHASE-II),SM/16462 |
Augmentation |
Digha Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Junior Engineer,Sri Mrityunjoy Paria, JE/Haldia Electrical Sub-Division. |
03/03/2023 |
19/04/2023 |
31/12/2025 |
29/12/2025 |
3 |
428 |
128.06 |
15.67 |
35 |
12 |
| 360 |
Tamluk Division |
PURBA MEDINIPUR |
Mahisadal |
RETROFITTING TO ACCOMMODATE FHTC UNDER JJM IN LAKSHYA PWSS WITHIN MAHISHADAL BLOCK UNDER HALDIA SUB-DIVISION OF TAMLUK DIVISION, PHE DTE. ,SM/16463 |
Augmentation |
Haldia Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Junior Engineer,Sri Krishanu Mondal, JE/Haldia Electrical Sub-Division. |
03/03/2023 |
19/04/2023 |
31/12/2025 |
29/12/2025 |
3 |
920 |
130.27 |
6.52 |
10 |
5 |
| 361 |
Tamluk Division |
PURBA MEDINIPUR |
Deshopran |
Augmentation of Contai Saline Area Zone-IV Part-II Piped Water Supply Scheme ,SM/16464 |
Augmentation |
Contai Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Junior Engineer,Sri Mrityunjoy Paria, JE/Haldia Electrical Sub-Division. |
03/03/2023 |
11/07/2023 |
11/07/2025 |
29/12/2025 |
4 |
1,636 |
665.82 |
3.49 |
10 |
1 |
| 362 |
Tamluk Division |
PURBA MEDINIPUR |
Egra - II |
Retrofitting to Accommodate FHTC under JJM in Chirulia PWSS under Egra-II Block (Phase-III),SM/16465 |
Augmentation |
Digha Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Junior Engineer,Sri Sukanta Mondal, JE/Haldia Electrical Sub-Division. |
03/03/2023 |
17/05/2023 |
31/12/2025 |
29/12/2025 |
3 |
0 |
122.31 |
25.01 |
15 |
20 |
| 363 |
Tamluk Division |
PURBA MEDINIPUR |
Egra - II |
Retrofitting to Accommodate FHTC under JJM in Dulalpur PWSS under Egra-II Block (Phase-II),SM/16466 |
Retrofitting |
Digha Sub-Division |
Assistant Engineer |
Junior Engineer |
03/03/2023 |
19/04/2023 |
31/12/2025 |
29/12/2025 |
2 |
305 |
39.56 |
25.66 |
50 |
65 |
| 364 |
Tamluk Division |
PURBA MEDINIPUR |
Ramnagar - I |
Retrofitting to Accommodate FHTC under JJM in Paya (Mahaprabhu) PWSS under Ramnagar-I Block (Phase-II),SM/16467 |
Retrofitting |
Digha Sub-Division |
Assistant Engineer |
Junior Engineer |
03/03/2023 |
19/04/2023 |
31/12/2025 |
29/12/2025 |
1 |
319 |
72.07 |
57.26 |
50 |
79 |
| 365 |
Tamluk Division |
PURBA MEDINIPUR |
Kolaghat |
BALANCE WORK FOR RETROFITTING TO ACCOMMODATE FHTC (545 NOS) UNDER JJM SURFACE WATER BASED WATER SUPPLY SCHEME FOR ZONE VII,BLOCK-KOLAGHAT IN THE DISTRICT OF PURBA MEDINIPUR. (PHASE-III),SM/16468 |
Retrofitting |
Tamluk Sadar Sub-Division |
Assistant Engineer |
Junior Engineer |
03/03/2023 |
19/04/2023 |
31/12/2025 |
29/12/2025 |
1 |
545 |
34.18 |
30.37 |
95 |
89 |
| 366 |
Tamluk Division |
PURBA MEDINIPUR |
Kolaghat |
BALANCE WORK FOR RETROFITTING TO ACCOMMODATE FHTC (1180 NOS) AND LAYNE OF UPVC PIPELINE DUE TO UNCOVERED AREA OF THIS ZONE AT DIFFERENT NODAL POINT UNDER JJM IN SURFACE WATER BASED WATER SUPPLY SCHEME FOR ZONE-XI, BLOCK-KOLAGHAT IN THE DISTRICT OF PURBA M,SM/16469 |
Retrofitting |
Tamluk Sadar Sub-Division |
Assistant Engineer |
Junior Engineer |
03/03/2023 |
19/04/2023 |
31/12/2025 |
29/12/2025 |
2 |
1,180 |
108.21 |
79.29 |
50 |
73 |
| 367 |
Tamluk Division |
PURBA MEDINIPUR |
Kolaghat |
BALANCE WORK FOR RETROFITTING TO ACCOMMODATE FHTC (851 NOS.) AND LAYING OF UPVC PIPELINE DUE TO UNCOVERED AREA OF THIS ZONE AT DIFFERENT NODAL POINT UNDER JJM IN SURFACE WATER BASED WATER SUPPLY SCHEME FOR ZONE-XII, BLOCK-KOLAGHAT IN THE DISTRICT OF PURBA,SM/16470 |
Retrofitting |
Tamluk Sadar Sub-Division |
Assistant Engineer |
Junior Engineer |
03/03/2023 |
19/04/2023 |
31/12/2025 |
29/12/2025 |
2 |
851 |
59.08 |
51.09 |
95 |
86 |
| 368 |
Tamluk Division |
PURBA MEDINIPUR |
Egra - I |
Augmentation of Ground Water Based Bagmari Water Supply Scheme ,SM/16711 |
Augmentation |
Digha Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Junior Engineer,Sri Mrityunjoy Paria, JE/Haldia Electrical Sub-Division. |
14/03/2023 |
04/05/2023 |
31/12/2025 |
29/12/2025 |
8 |
929 |
339.13 |
176.47 |
70 |
52 |
| 369 |
Tamluk Division |
PURBA MEDINIPUR |
Potashpur - II |
Augmentation of Ground Water Based Piped Water Supply Scheme for Bagmari Accommodate FHTC under Potashpur-II Block within Purba Medinipur District.,SM/16712 |
Augmentation |
Contai Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Junior Engineer,Sri Sukanta Mondal, JE/Haldia Electrical Sub-Division. |
14/03/2023 |
07/08/2023 |
31/12/2025 |
29/12/2025 |
5 |
0 |
143.36 |
69.52 |
35 |
48 |
| 370 |
Tamluk Division |
PURBA MEDINIPUR |
Potashpur - II |
Augmentation of Ground Water Based Piped Water Supply Scheme for Pratapdighi Accommodate FHTC under Potashpur-II Block within Purba Medinipur District. ,SM/16713 |
Augmentation |
Contai Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Junior Engineer,Sri Sukanta Mondal, JE/Haldia Electrical Sub-Division. |
14/03/2023 |
07/08/2023 |
31/03/2025 |
29/12/2025 |
4 |
0 |
140.37 |
0.00 |
35 |
0 |
| 371 |
Tamluk Division |
PURBA MEDINIPUR |
Chandipur |
1 (One) Nos. Boosting Tube Well for Saripur Water Supply Scheme of Chandipur Block under Tamluk Sub-Division of Tamluk Division, PHE Dte. within the Purba Medinipur District.,SM/16938 |
Augmentation |
Tamluk Sadar Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Junior Engineer,Sri Krishanu Mondal, JE/Haldia Electrical Sub-Division. |
16/03/2023 |
06/04/2023 |
31/12/2025 |
29/12/2025 |
5 |
0 |
80.74 |
42.49 |
15 |
53 |
| 372 |
Tamluk Division |
PURBA MEDINIPUR |
Deshopran |
1 (One) Nos. Boosting Tube Well for Source Augmentation of Dariapur Water Supply Scheme of Contai-II (Deshapran) Block under Contai Sub-Division of Tamluk Division, PHE Dte. within Purba Medinipur District. ,SM/16939 |
Augmentation |
Contai Sub-Division |
Assistant Engineer |
Junior Engineer,Sri Krishanu Mondal, JE/Haldia Electrical Sub-Division.,Sri Mrityunjoy Paria, JE/Haldia Electrical Sub-Division. |
16/03/2023 |
20/04/2023 |
31/12/2025 |
29/12/2025 |
4 |
0 |
62.87 |
0.83 |
15 |
1 |
| 373 |
Tamluk Division |
PURBA MEDINIPUR |
Egra - II |
Ground Water Based Mini Piped Water Supply Scheme (Below 100 Household) at different JL No. 5,124,534,150,153,140,97,79,87,151,11 for different Blocks under Tamluk Division, PHE Dte. within Purba Medinipur District.,SM/16941 |
New |
Haldia Electrical Sub-Division |
Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Sri Mrityunjoy Paria, JE/Haldia Electrical Sub-Division.,Sri Sukanta Mondal, JE/Haldia Electrical Sub-Division. |
16/03/2023 |
05/04/2023 |
31/12/2025 |
29/12/2025 |
12 |
896 |
448.63 |
19.78 |
35 |
4 |
| 374 |
Tamluk Division |
PURBA MEDINIPUR |
Contai - III |
Augmentation of Dhanghara PWSS to Accommodate FHTC under JJM with Allied works under Contai-III Block (Phase-II) ,SM/16946 |
Augmentation |
Contai Sub-Division |
Assistant Engineer |
Junior Engineer |
16/03/2023 |
19/05/2023 |
31/12/2025 |
29/12/2025 |
2 |
0 |
85.63 |
56.28 |
15 |
66 |
| 375 |
Tamluk Division |
PURBA MEDINIPUR |
Deshopran |
Ground Water Based Mini Piped Water Supply Scheme (Maximum 100 Household) at different villages (2 Nos.) under Contai-II Block of Tamluk Division, PHE Dte. within Purba Medinipur District. ,SM/16948 |
New |
Haldia Electrical Sub-Division |
Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Sri Mrityunjoy Paria, JE/Haldia Electrical Sub-Division. |
16/03/2023 |
05/04/2023 |
31/12/2025 |
29/12/2025 |
3 |
322 |
71.27 |
0.00 |
10 |
0 |
| 376 |
Tamluk Division |
PURBA MEDINIPUR |
Deshopran |
Ground Water Based Mini Piped Water Supply Scheme (Maximum 100 Household) at different locations under Khejuri-II , Contai-II, Egra-II, Egra-I & Contai-III Block within Purba Medinipur District under Tamluk Division, PHE Dte,SM/17173 |
New |
Haldia Electrical Sub-Division |
Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Sri Mrityunjoy Paria, JE/Haldia Electrical Sub-Division.,Sri Sukanta Mondal, JE/Haldia Electrical Sub-Division.,Sri Ujjal Kumar Dey, JE/Haldia Electrical Sub-Division. |
16/03/2023 |
05/04/2023 |
31/12/2025 |
29/12/2025 |
3 |
840 |
448.63 |
312.63 |
30 |
70 |
| 377 |
Tamluk Division |
PURBA MEDINIPUR |
Panskura |
1 (One) Nos. Boosting Tube Well for Dakshin Mechogram Water Supply Scheme of Panskura-I Block under Tamluk Sub-Division of Tamluk Division, PHE Dte. within the Purba Medinipur District. ,SM/17193 |
Augmentation |
Tamluk Sadar Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Junior Engineer,Sri Raju Pramanik, JE/Haldia Electrical Sub-Division. |
15/03/2023 |
06/04/2023 |
31/12/2025 |
29/12/2025 |
6 |
0 |
80.74 |
32.81 |
50 |
41 |
| 378 |
Tamluk Division |
PURBA MEDINIPUR |
Chandipur |
2 (Two) Nos. Boosting Tube Well for Kulbari Water Supply Scheme of Chandipur Block under Tamluk Sub-Division of Tamluk Division, PHE Dte. within the Purba Medinipur District.,SM/17194 |
Augmentation |
Tamluk Sadar Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Junior Engineer,Sri Krishanu Mondal, JE/Haldia Electrical Sub-Division. |
15/03/2023 |
06/04/2023 |
31/12/2025 |
29/12/2025 |
6 |
0 |
161.69 |
59.38 |
40 |
37 |
| 379 |
Tamluk Division |
PURBA MEDINIPUR |
Moyna |
1 (One) Nos. Boosting Tube Well for Paramanandapur Water Supply Scheme of Moyna Block under Tamluk Sub-Division of Tamluk Division, PHE Dte. within the Purba Medinipur District.,SM/17221 |
Augmentation |
Tamluk Sadar Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Junior Engineer,Sri Krishanu Mondal, JE/Haldia Electrical Sub-Division. |
15/03/2023 |
06/04/2023 |
31/12/2025 |
29/12/2025 |
3 |
0 |
80.74 |
50.80 |
35 |
63 |
| 380 |
Tamluk Division |
PURBA MEDINIPUR |
Bhagawanpur - I |
NUNHUNDA AND IT'S ADJOINING MOUJAS PWSS,SM/18303 |
New |
Contai Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Junior Engineer,Sri Sukanta Mondal, JE/Haldia Electrical Sub-Division. |
26/06/2023 |
12/07/2023 |
31/12/2025 |
29/12/2025 |
12 |
4,497 |
1,458.55 |
498.57 |
25 |
34 |
| 381 |
Tamluk Division |
PURBA MEDINIPUR |
Bhagawanpur - I |
GURGRAM & ADJOINING MOUZAS,SM/18311 |
New |
Contai Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Junior Engineer,Sri Sukanta Mondal, JE/Haldia Electrical Sub-Division. |
26/06/2023 |
26/07/2023 |
31/12/2025 |
29/12/2025 |
6 |
2,897 |
1,027.99 |
656.92 |
20 |
64 |
| 382 |
Tamluk Division |
PURBA MEDINIPUR |
Deshopran |
1 (One) No. Boosting Tube Well for Source Augmentation of Bankiput Water Supply Scheme of Contai-II (Deshpran) Block under Contai Sub-Division of Tamluk Division, PHE Dte. within Purba Medinipur District.,SM/18765 |
Augmentation |
|
|
|
23/08/2023 |
05/06/2023 |
31/12/2025 |
29/12/2025 |
2 |
0 |
63.12 |
1.50 |
15 |
2 |
| 383 |
Tamluk Division |
PURBA MEDINIPUR |
Ramnagar - I |
Piped Water Supply Scheme for Sankarpur Zone-I,SM/18766 |
Augmentation |
Digha Sub-Division |
Assistant Engineer,Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Division. |
Junior Engineer,Sri Mrityunjoy Paria, JE/Haldia Electrical Sub-Division. |
23/08/2023 |
01/08/2023 |
31/12/2025 |
29/12/2025 |
9 |
486 |
370.29 |
105.07 |
25 |
28 |