D4- Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Clear
Rs. in Lakh
Sl No. Division
Working Divisions
Sub Division
Working Divisions
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
1905 1,17,430.62 55,861.96  
1 RCFA Division -I PAYMENT OF WALEAVE PLAN & SURVEY CHARGES ER-ASN-2024-WL-10 BILL/00002/2024-2025 03/24-25 18/04/2024 0 EASTERN RAILWAY 0.08 0.00 0
2 RCFA Division -I Deposition of way leave fee for pipeline crossing of Railway track in between Jamuria (JMA) and barabani (BBI) station of Asansol Division, Eastern Railway BILL/00011/2023-2024 30/23-24 03/05/2023 0 EASTERN RAILWAY 0.53 0.00 0
3 RCFA Division -I Payment of Way leave Plan & Survey charges for track crossing proposal with Application ID ER-ASN2024-WL-18 dt 15.04.2024 BILL/00012/2024-2025 11/24-25 24/04/2024 0 EASTERN RAILWAY 0.25 0.00 0
4 RCFA Division -I DEPOSITION OF WAY LEAVE FEE (ER-ASN-2023-WL-17) BILL/00017/2023-2024 41/23-24 10/05/2023 0 EASTERN RAILWAY 5.37 0.00 0
5 RCFA Division -I June 2022 to Novemeber & December 2022 to Feburary 2023 BILL/00030/2023-2024 19/23-24 18/04/2023 0 PRASENJIT DEY 3.60 0.00 0
6 RCFA Division -I Restoration amount for unauthorised execavation and damaged at Ethora Nuni Road [Road connecting FR 10 and FR 19 (FR 13) under Asansol highwa BILL/00039/2022-2023 Asn-Highway-PWD 11/01/2023 0 EXECUTIVE ENGINEER, ASANSOL HIGHWAY DIVISION, PW (ROADS) DIRECTT. 10.45 0.00 0
7 RCFA Division -I Permission for laying of water pipeline along NH-02 from Duburdih (km. 441+780) to Kalla More (Km. 462+080) and 1 no. crossing acros NH-2 in the state of West Bengal unde RCFA Divn-I PHE Dte - Submission of Bank Guarantee reg. BILL/00053/2024-2025 268/24-25 05/09/2024 0 NATIONAL HIGHWAY AUTHORITY OF INDIA 104.25 0.00 0
8 RCFA Division -I Deposition of way leave fee for pipeline crossing of Railway track in between Jamuria (JMA) and Barabani stan (BBI) km post 25/02-25/03 of Asansol Division BILL/00058/2023-2024 65/23-24 25/05/2023 0 EASTERN RAILWAY 4.63 0.00 0
9 RCFA Division -I Deposition of way leave fee for pipeline crossing of Railway track in between Salanpur (SLS) and Rupnarayanpur (RNPR) km post 23/15-17 to 231/16-18 of Asansol Division, Eastern Railway BILL/00059/2023-2024 64/23-24 25/05/2023 0 EASTERN RAILWAY 5.12 0.00 0
10 RCFA Division -I Proposal for diversion of forest land for consytruction of OHR Capacity 350 cum of Augmentation of Roopganj Piped water supply scheme (JJM Work) under Durgapur W/S Division, PHE Directoreate - Demand note for payment of NPV, CA, Boundary demarcation witll pillar fencing etc. BILL/00105/2024-2025 53/24-25 20/05/2024 0 DIVISIONAL FOREST OFFICER, BURDWAN DIVISION 0.80 0.00 0
11 RCFA Division -I Way leave / Track crossing proposal with application ID : ER-ASN-2024-WL-08 at Andal under Augmentation of RCFA Part-II (Zone-9) under RCFA Division-I PHE Dte BILL/00112/2024-2025 46/24-25 20/05/2024 0 EASTERN RAILWAY 4.81 0.00 0
12 RCFA Division -I Way leave / Track crossing proposal with application ID : ER-ASN-2024-WL-91 at Pandabeswar under Augmentation of RCFA Part-II (Zone-11) under RCFA Division-I PHE Dte BILL/00114/2024-2025 47/24-25 20/05/2024 0 EASTERN RAILWAY 5.45 0.00 0
13 RCFA Division -I Way leave / Track crossing proposal with application ID : ER-ASN-2024-WL-92 at Ukhra under Augmentation of RCFA Part-II (Zone-15) under RCFA Division-I PHE Dte BILL/00115/2024-2025 48/24-25 20/05/2024 0 EASTERN RAILWAY 16.46 0.00 0
14 RCFA Division -I Way leave / Track crossing proposal with application ID : ER-ASN-2024-WL-90 at Pandabeswar under Augmentation of RCFA Part-II (Zone-11) under RCFA Division-I PHE Dte BILL/00116/2024-2025 49/24-25 20/05/2024 0 EASTERN RAILWAY 5.45 0.00 0
15 RCFA Division -I Way leave / Track crossing proposal with application ID : ER-ASN-2024-WL-95 at Sonachara under Augmentation of RCFA Part-II (Zone-13) under RCFA Division-I PHE Dte BILL/00117/2024-2025 50/24-25 20/05/2024 0 EASTERN RAILWAY 4.58 0.00 0
16 RCFA Division -I Way leave / Track crossing proposal with application ID : ER-ASN-2024-WL-93 at sonachara under Augmentation of RCFA Part-II (Zone-13) under RCFA Division-I PHE Dte BILL/00118/2024-2025 51/24-25 20/05/2024 0 EASTERN RAILWAY 4.90 0.00 0
17 RCFA Division -I Proposal for diversion of forest land for consytruction of OHR Capacity 350 cum of Augmentation of Roopganj Piped water supply scheme (JJM Work) under Durgapur W/S Division, PHE Directoreate - Demand note for payment of NPV, CA, Boundary demarcation witll pillar fencing etc. :- Cost of Boundary demarcation with pillar BILL/00146/2024-2025 66/24-25 28/05/2024 0 DIVISIONAL FOREST OFFICER, BURDWAN DIVISION 0.30 0.00 0
18 RCFA Division -I Desposition of way leave Fees for Railway crossing for pipeline. BILL/00147/2022-2023 947/22-23 09/03/2023 0 EASTERN RAILWAY 5.04 0.00 0
19 RCFA Division -I Deposition of way leave Fees for Railway crossing for pipeline. BILL/00150/2022-2023 946/22-23 09/03/2023 0 EASTERN RAILWAY 6.08 0.00 0
20 RCFA Division -I Way leave / Track crossing proposal with application ID : ER-ASN-2024-WL-10 under Augmentation of RCFA Part-II (Zone-9) under RCFA Division-I PHE Dte BILL/00155/2024-2025 68/24-25 30/05/2024 0 EASTERN RAILWAY 4.73 0.00 0
21 RCFA Division -I Way leave / Track crossing proposal with application ID : ER-ASN-2024-WL-18 under Augmentation of RCFA Part-II (Zone-11) under RCFA Division-I PHE Dte BILL/00156/2024-2025 69/24-25 30/05/2024 0 EASTERN RAILWAY 14.30 0.00 0
22 RCFA Division -I Suuply of UPS laboratory antivirus toner 12 for Asansol Laboratory BILL/00210/2024-2025 91/24-25 13/06/2024 0 SHARMA ENGINEERING WORKS 0.08 0.00 0
23 RCFA Division -I Supply of it periphersls under sub district laboratory BILL/00211/2024-2025 92/24-25 13/06/2024 0 SHARMA ENGINEERING WORKS 0.02 0.00 0
24 RCFA Division -I Restoration work for laying D.I pipeline along the Hard Shoulder from Ch. 3.67 Km to Ch. 8.50 kmp at left side and from ch. 3.00 to Ch. 4.50 kmp (ICDS more to Maira colliary ) at right side of Andal - Ukhra Road under Asansol Division, PWD in the district of Paschim Bardhaman BILL/00217/2024-2025 112/24-25 21/06/2024 0 EXECUTIVE ENGINEER, ASANSOL DIVISION, PWD 20.40 0.00 0
25 RCFA Division -I Fuel bill in favor of Ranjit Auto for the month of March 2024 for 1 no. Vehicle for Office of the Deputy Superintending Engineer, RCFA W/S Circle, PHE Dte, Govt. of West Bengal BILL/00221/2024-2025 109/24-25 21/06/2024 0 RANAJIT AUTO 0.20 0.00 0
26 RCFA Division -I Fuel bill in favor of Ranjit Auto for the month of April 2024 for 1 no. Vehicle for Office of the Deputy Superintending Engineer, RCFA W/S Circle, PHE Dte, Govt. of West Bengal BILL/00222/2024-2025 110/24-25 21/06/2024 0 RANAJIT AUTO 0.19 0.00 0
27 RCFA Division -I Arrangement of brakfast and lunch box, etc. for DWSM meeting held on 22.06.2024 at ADDA conference hall BILL/00256/2024-2025 121/24-25 03/07/2024 0 MUKHERJEE TRADERS 0.28 0.00 0
28 RCFA Division -I Fuel bill of Ranajit auto against vehicle no WB 37D 0482 for the month of May BILL/00265/2023-2024 116/1/23-24 03/07/2023 0 RANAJIT AUTO 0.23 0.00 0
29 RCFA Division -I ER-ASN-2023-WL-28 (Salanpur SLS to Rupnarayanpur RNPR) BILL/00278/2023-2024 130/23-24 10/07/2023 0 EASTERN RAILWAY 5.70 0.00 0
30 RCFA Division -I Color Xerox repairing and supply of color xerox toner BILL/00292/2024-2025 131/24-25 11/07/2024 0 MUKHERJEE TRADERS 0.17 0.00 0
31 RCFA Division -I Restoreation and repairing work from Ch. 13415 to 14300 of Neamatpur - Rupnarayanpur Road (FR-10) under Asansol Division, PWD for laying of distribution system of Zone - VII under JJM work in the district of Paschim Bardhaman during the year 2024-2025 under Augmentation of RCFA Part II Piped Water Supply Scheme Volume -I under RCFA Division-I PHE Dte BILL/00307/2024-2025 168/24-25 23/07/2024 0 EXECUTIVE ENGINEER, ASANSOL DIVISION, PWD 14.85 0.00 0
32 RCFA Division -I BILL/00327/2023-2024 149/1/23-24 21/07/2023 0 RANAJIT AUTO 0.17 0.00 0
33 RCFA Division -I Installation of Jio Fiber connection for Six months under RCFA Division-I PHE Dte. BILL/00329/2024-2025 153/24-25 19/07/2024 0 MUKHERJEE TRADERS 0.07 0.00 0
34 RCFA Division -I Supply of chair for SE/RCFA Circle BILL/00330/2023-2024 151/23-24 25/07/2023 0 GLOBAL LOGISTIC CO 0.23 0.00 0
35 RCFA Division -I Bill for GST Return Oct 2023 to Feb 2024 24 Q 1 & Q 2 2023-2024 and 16 A 26 Q 23-24 BILL/00348/2024-2025 172/24-25 25/07/2024 0 SHRESTHA & ASSOCIATES 0.44 0.00 0
36 RCFA Division -I Arrangement of Stationary items , Flex and Tea snacks for Krmashree meeting held on 12.07.2024 at RTC Hall Asansol BILL/00358/2024-2025 171/24-25 26/07/2024 0 BLESSING ENTERPRISE 0.14 0.00 0
37 RCFA Division -I fuel bill For WB 37D 0482 Nov 2022 BILL/00432/2022-2023 821/22-23 20/01/2023 0 RANAJIT AUTO 0.27 0.00 0
38 RCFA Division -I Restoration work for laying of under ground water supply line (400 mm dia) Ch. 0.100 kmp to ch 1.350 on Ukhra Haripur (0-5) road in the district of Pachim Bardhaman BILL/00463/2023-2024 235/23-24 29/08/2023 0 EXECUTIVE ENGINEER, ASANSOL DIVISION, PWD 32.64 0.00 0
39 RCFA Division -I Restoration and repairing work form Ch. 6.889 km to Ch 12.7 mm km of Chinchuria-Bhuri road under Asansol Division, PWD for laying pipe line under JJM BILL/00464/2023-2024 236/23-24 29/08/2023 0 EXECUTIVE ENGINEER, ASANSOL DIVISION, PWD 68.17 0.00 0
40 RCFA Division -I fuel bill infavor of Ranjit Auto for one no vechile for affiliated of the Deputy superintending Engineer RCFA W/S circle PHE Dte Govt of west bengal BILL/00487/2024-2025 255/24-25 28/08/2024 0 RANAJIT AUTO 0.24 0.00 0
41 RCFA Division -I fuel bill infavor of Ranjit Auto for one no vechile for affiliated of the Deputy superintending Engineer RCFA W/S circle PHE Dte Govt of west bengal BILL/00489/2024-2025 257/24-25 28/08/2024 0 RANAJIT AUTO 0.25 0.00 0
42 RCFA Division -I Fuel and vehicle bill for Feb 2023 to June 23 BILL/00511/2023-2024 234/23-24 04/09/2023 0 NIRMALA TRADERS 1.19 0.00 0
43 RCFA Division -I Car bill may 23 and june 23 BILL/00518/2023-2024 234/2/23-24 05/09/2023 0 NIRMALA TRADERS 0.78 0.00 0
44 RCFA Division -I License Fees for five (05) years for 6-lanning of Barwa Adda - Panagarh section of NH-2 from km 398.240 to km 521.120 including Panagarh Bypass in the state of Jharkhand & West Bengal under NHDP Phase -V on BOT (Toll) on DBFOT pattern - Permission for laying of water pipeline along NH-2 from Kalla more (km 462+080) to Harishpur (km+918) and 7 nos crossing across NH-2 in the state of West Bengal under Augmentatin of RCFA Pt II Volume -II under RCFA Division-I PHE Dte. BILL/00522/2024-2025 282/24-25 09/09/2024 0 NATIONAL HIGHWAY AUTHORITY OF INDIA 164.48 0.00 0
45 RCFA Division -I hirting of maxi cab for date 27.7.2023 to 28.07.2023 us of AE RCFA Div WB37D 9526 BILL/00532/2023-2024 256/23-24 11/09/2023 0 NIRMALA TRADERS 0.06 0.00 0
46 RCFA Division -I Road restoration of work 03 nes location (Reghunathpur Kantaberia via Molandihi, Muchipara Shibpur, Reghunathpur Kantaberna via Molandihi) BILL/00544/2024-2025 275/24-25 06/09/2024 0 EXECUTIVE ENGINEER, ASANSOL HIGHWAY DIVISION, PW (ROADS) DIRECTT. 26.80 0.00 0
47 RCFA Division -I Way leave track crossing proposal with application ID - ER-ASN-2024-WL-56 Payment of wayleave facility charges. BILL/00545/2024-2025 272/24-25 05/09/2024 0 EASTERN RAILWAY 6.27 0.00 0
48 RCFA Division -I Way leave track crossing proposal with application ID - ER-ASN-2024-WL-57 Payment of wayleave facility charges. BILL/00546/2024-2025 273/24-25 05/09/2024 0 EASTERN RAILWAY 9.09 0.00 0
49 RCFA Division -I April 2023 BILL/00559/2023-2024 77/23-24 06/06/2023 0 SHYAMAL MAJI 0.15 0.00 0
50 RCFA Division -I fuel bill april 2023 shyamal maji BILL/00560/2023-2024 77/1/23-24 06/06/2023 0 RANAJIT AUTO 0.20 0.00 0
51 RCFA Division -I Spiral Binding BILL/00610/2023-2024 185/23-24 10/08/2023 0 MUKHERJEE TRADERS 0.68 0.00 0
52 RCFA Division -I Transporting loading and unloading of jackets Banners etc for pump operator and valve operation at sites under JJM BILL/00611/2023-2024 179/23-24 08/08/2023 0 SHARMA ENGINEERING WORKS 0.18 0.00 0
53 RCFA Division -I hire charges & fuel bill of Ranajit Auto BILL/00612/2023-2024 220/23-24 22/08/2023 0 SHYAMAL MAJI 0.15 0.00 0
54 RCFA Division -I fuel bill shyamal maji jyly 2023 BILL/00613/2023-2024 220/23-24 24/08/2023 0 RANAJIT AUTO 0.16 0.00 0
55 RCFA Division -I Khepi Maa Traders BILL/00614/2023-2024 215/23-24 22/08/2023 0 KHEPI MAA TRADERS 1.16 0.00 0
56 RCFA Division -I Acceptance cum work order for Providing FHTC through Retrofitting at Bhaluka & Sonepur Bazari under Kendra Khottamdih Water Supply Scheme under RCFA Division-I PHE Dte. BILL/00619/2023-2024 204/23-24 18/08/2023 0 MACHINO TECHNO 19.87 0.00 0
57 RCFA Division -I Hire charges and fuel bill 16.05.2023 to 15.08.2023 BILL/00635/2023-2024 264/23-24 27/09/2023 0 PRAMIT CHATTERJEE 1.20 0.00 0
58 RCFA Division -I Hire charges for the month of August 2023 BILL/00636/2023-2024 262/23-24 27/09/2023 0 SHYAMAL MAJI 0.15 0.00 0
59 RCFA Division -I Fuel bill of WB 37D 0482 BILL/00637/2023-2024 263/23-24 27/09/2023 0 RANAJIT AUTO 0.22 0.00 0
60 RCFA Division -I Hiring of Maxi Cab (Non Air-conditioned) Bharat Stage-II/BS-III purchased on or after 01.05.2008 with Diesel/LPG/CNG Engine. for the Office use of the Assistant Engineer, RCFA Division-I, Public Health Engineering Directorate, Govt. of West Bengal (w.e.f. 01.07.2022 to 30.06.2023)(sl no 01) BILL/00703/2022-2023 1210/22-23 31/03/2023 0 NIRMALA TRADERS 2.80 0.00 0
61 RCFA Division -I Vehicle bill BILL/00704/2022-2023 1166/22-23 31/03/2023 0 KHEPI MAA TRADERS 2.21 0.00 0
62 RCFA Division -I VEHICLE BILL BILL/00705/2022-2023 1165/22-23 30/03/2023 0 PRAMIT CHATTERJEE 1.20 0.00 0
63 RCFA Division -I IT GST FILLING BILL/00706/2022-2023 1206/22-23 30/03/2023 0 SHRESTHA & ASSOCIATES 0.50 0.00 0
64 RCFA Division -I VEHICLE BILL BILL/00707/2022-2023 1113/22-23 30/03/2023 0 SHYAMAL MAJI 0.19 0.00 0
65 RCFA Division -I Supply of computer for Assistant Enginner-II BILL/00708/2022-2023 944/22-23 30/03/2023 0 MUKHERJEE TRADERS 0.42 0.00 0
66 RCFA Division -I Hire charge and fuel bill for the month of July 2023 to September 2023 BILL/00754/2023-2024 339/23-24 17/10/2023 0 SHYAMAL MAJI 0.15 0.00 0
67 RCFA Division -I Fuel bill for WB37D0482 for the month of Sept 2023 BILL/00755/2023-2024 339/1/23-24 17/10/2023 0 RANAJIT AUTO 0.22 0.00 0
68 RCFA Division -I Hire charges and fuel bill for the month of July 2023 to Sept 2023 BILL/00756/2023-2024 338/23-24 17/10/2023 0 NIRMALA TRADERS 1.20 0.00 0
69 RCFA Division -I Hire charge and fuel bill for the month o June 2023 to August 2023 BILL/00759/2023-2024 323/23-24 17/10/2023 0 KHEPI MAA TRADERS 1.19 0.00 0
70 RCFA Division -I Engagement of 01 (One) no person under control of 2 (Two) nos AE/RCFA Div-I day to day report and return of FHTC as per scheme wise panchayet wise and updation of JJm BILL/00761/2023-2024 320/23-24 16/10/2023 0 MUKHERJEE TRADERS 0.49 0.00 0
71 RCFA Division -I Execution of agreement with Damodar Valley Corporation for drawl of 15.757 (Fifteen point seven five seven) MGD raw water for RCFA Part-II piped water supply scheme under RCFA Public Health Engineering Directorate, Asansol from Maithon Reservoir BILL/00769/2023-2024 371/23-24 21/11/2023 0 DAMODAR VALLEY CORPORATION 13.08 0.00 0
72 RCFA Division -I Submissin of quarterly revised return for non salary return Bill no 7236 to 7339 BILL/00774/2023-2024 367/23-24 10/11/2023 0 SHRESTHA & ASSOCIATES 0.36 0.00 0
73 RCFA Division -I Way leave / track crossing proposal with Application ID ER-ASN-2023-WL-72 for Nimcha - J.K.Nagar under AUGMENTATION OF PWSS OF RCFA PART-II (ZONE-3) under RCFA Division-I, PHE Dte BILL/00788/2023-2024 382/23-24 22/11/2023 0 EASTERN RAILWAY 0.09 0.00 0
74 RCFA Division -I Way leave / track crossing proposal with Application ID ER-ASN-2023-WL-71 for Nimcha - J.K.Nagar under AUGMENTATION OF PWSS OF RCFA PART-II (ZONE-3) under RCFA Division-I, PHE Dte BILL/00790/2023-2024 378/23-24 22/11/2023 0 EASTERN RAILWAY 0.11 0.00 0
75 RCFA Division -I Way leave / track crossing proposal with Application ID ER-ASN-2023-WL-70 for Nimcha - J.K.Nagar under AUGMENTATION OF PWSS OF RCFA PART-II (ZONE-3) under RCFA Division-I, PHE Dte BILL/00791/2023-2024 379/23-24 22/11/2023 0 EASTERN RAILWAY 0.11 0.00 0
76 RCFA Division -I Way leave / track crossing proposal with Application ID ER-ASN-2023-WL-69 for Nimcha - J.K.Nagar under AUGMENTATION OF PWSS OF RCFA PART-II (ZONE-3) under RCFA Division-I, PHE Dte BILL/00792/2023-2024 380/23-24 22/11/2023 0 EASTERN RAILWAY 0.09 0.00 0
77 RCFA Division -I Way leave / track crossing proposal with Application ID ER-ASN-2023-WL-68 for Nimcha - J.K.Nagar under AUGMENTATION OF PWSS OF RCFA PART-II (ZONE-3) under RCFA Division-I, PHE Dte BILL/00793/2023-2024 381/23-24 22/11/2023 0 EASTERN RAILWAY 0.09 0.00 0
78 RCFA Division -I Way leave / track crossing proposal with Application ID ER-ASN-2023-WL-67 for Nimcha - Kalipahari under AUGMENTATION OF PWSS OF RCFA PART-II (ZONE-3) under RCFA Division-I, PHE Dte BILL/00794/2023-2024 383/23-24 22/11/2023 0 EASTERN RAILWAY 0.14 0.00 0
79 RCFA Division -I Survey Charges for Way leave / Track crossing proposal with Application ID : ER-ASN-2023-WL-65 dt 22.11.2023 in Indian railway from Andal to Bhaktarnagar under Augmentation of RCFA Pt-II (Zone-1A) under RCFA Division-I, PHE Dte. BILL/00821/2023-2024 390/23-24 29/11/2023 0 EASTERN RAILWAY 0.25 0.00 0
80 RCFA Division -I Survey Charges for Way leave / Track crossing proposal with Application ID : ER-ASN-2023-WL-66 dt 22.11.2023 in Indian railway from Andal to Andal Junction Cabin under Augmentation of RCFA Pt-II (Zone-1A) under RCFA Division-I, PHE Dte. BILL/00822/2023-2024 test 30/11/2023 0 EASTERN RAILWAY 0.24 0.00 0
81 RCFA Division -I Hire charges and fuel bill for Executive Engineer RCFA Division-I PHE Dte BILL/00823/2023-2024 291/23-24 10/10/2023 0 NIRMALA TRADERS 0.06 0.00 0
82 RCFA Division -I Way leave / track crossing proposal with Application ID ER-ASN-2023-WL-55 for Asansol East Cabin - Asansol East Hump under Augmentation of RCFA Part II Piped Water Supply Scheme Volume -I (Intake, RWRM, WTP, CWRMs & GLRs) under RCFA Division-I PHE Dte. BILL/00834/2023-2024 404/23-24 08/12/2023 0 EASTERN RAILWAY 149.35 0.00 0
83 RCFA Division -I Way leave / track crossing proposal with Application ID ER-ASN-2023-WL-57 for Kalipahari - Nimcha under Augmentation of RCFA Part II Piped Water Supply Scheme Volume -I (Intake, RWRM, WTP, CWRMs & GLRs) under RCFA Division-I PHE Dte. BILL/00837/2023-2024 410/23-24 08/12/2023 0 EASTERN RAILWAY 5.28 0.00 0
84 RCFA Division -I Way leave / track crossing proposal with Application ID ER-ASN-2023-WL-56 for Damodar under Augmentation of RCFA Part II Piped Water Supply Scheme Volume -I (Intake, RWRM, WTP, CWRMs & GLRs) under RCFA Division-I PHE Dte. BILL/00839/2023-2024 405/23-24 08/12/2023 0 EASTERN RAILWAY 19.69 0.00 0
85 RCFA Division -I Way leave / track crossing proposal with Application ID ER-ASN-2023-WL-61 for Baktarnagar - Raniganj under Augmentation of RCFA Part II Piped Water Supply Scheme Volume -I (Intake, RWRM, WTP, CWRMs & GLRs) under RCFA Division-I PHE Dte. BILL/00842/2023-2024 409/23-24 08/12/2023 0 EASTERN RAILWAY 9.91 0.00 0
86 RCFA Division -I Way leave / track crossing proposal with Application ID ER-ASN-2023-WL-53 for Salanpur - Sitarampur link Cabin under Augmentation of RCFA Part II Piped Water Supply Scheme Volume -I (Intake, RWRM, WTP, CWRMs & GLRs) under RCFA Division-I PHE Dte. BILL/00848/2023-2024 403/23-24 08/12/2023 0 EASTERN RAILWAY 15.82 0.00 0
87 RCFA Division -I Way leave / track crossing proposal with Application ID ER-ASN-2023-WL-52 for Damagoria under Augmentation of RCFA Part II Piped Water Supply Scheme Volume -I (Intake, RWRM, WTP, CWRMs & GLRs) under RCFA Division-I PHE Dte. BILL/00850/2023-2024 407/23-24 08/12/2023 0 EASTERN RAILWAY 15.20 0.00 0
88 RCFA Division -I Way leave / track crossing proposal with Application ID ER-ASN-2023-WL-58 for Sonachara - Topsi under Augmentation of RCFA Part II Piped Water Supply Scheme Volume -I (Intake, RWRM, WTP, CWRMs & GLRs) under RCFA Division-I PHE Dte. BILL/00855/2023-2024 412/23-24 08/12/2023 0 EASTERN RAILWAY 10.27 0.00 0
89 RCFA Division -I Way leave / track crossing proposal with Application ID ER-ASN-2023-WL-59 for Pandabeswar - Ukhra under Augmentation of RCFA Part II Piped Water Supply Scheme Volume -I (Intake, RWRM, WTP, CWRMs & GLRs) under RCFA Division-I PHE Dte. BILL/00859/2023-2024 408/23-24 08/12/2023 0 EASTERN RAILWAY 8.26 0.00 0
90 RCFA Division -I Way leave / track crossing proposal with Application ID ER-ASN-2023-WL-60 for Topsi - Sripur under Augmentation of RCFA Part II Piped Water Supply Scheme Volume -I (Intake, RWRM, WTP, CWRMs & GLRs) under RCFA Division-I PHE Dte. BILL/00861/2023-2024 411/23-24 08/12/2023 0 EASTERN RAILWAY 4.67 0.00 0
91 RCFA Division -I 100 mm dia water pipe line with 600 mm dia MS Casing pipe line (Jal Jeevan Mission) by R.C.F.A Division-1, PHE DTE, Asansol in between Parasia Siding ¿ New Jambad Siding at Km. CB-2/15-16 in Asansol Division of Eastern Railway under AUGMENTATION PWSS OF RCFA PART-II (ZONE-12B) UNDER RCFA DIVISION-I PHE DTE. BILL/00863/2024-2025 396/24-25 28/10/2024 0 EASTERN RAILWAY 4.58 0.00 0
92 RCFA Division -I Way leave permission for water supply poipe line for JJM carrier pipe dia 250 mm at Pandabeswar under Augmentation of RCFA PART-II (ZONE-8) under RCFA Div-I PHE Dte. BILL/00864/2024-2025 398/24-25 29/10/2024 0 EASTERN RAILWAY 1.19 0.00 0
93 RCFA Division -I Way leave / track crossing proposal with Application ID ER-ASN-2023-WL-54 for Chinchuria - Sitarampur under Augmentation of RCFA Part II Piped Water Supply Scheme Volume -I (Intake, RWRM, WTP, CWRMs & GLRs) under RCFA Division-I PHE Dte. BILL/00865/2023-2024 406/23-24 08/12/2023 0 EASTERN RAILWAY 4.78 0.00 0
94 RCFA Division -I Restoration work for laying of 450 mm D.I. K9 pipeline under JJM work within the paved carriageway from Ch. 0.000 km to Ch. kmp at Right Side, Ch 03.006 km to Ch. 3.206 kmp at left side & ch. 4.570 km to Ch. 5.000 kmp at left side of Ukhra-Haripur Road under Asansol Division, PWD in the district of Paschim Bardhaman BILL/00880/2024-2025 401/24-25 11/11/2024 0 EXECUTIVE ENGINEER, ASANSOL DIVISION, PWD 24.61 0.00 0
95 RCFA Division -I Arrangement of breakfast (Tea with snacks) for DWSM meeting held on 27.07.2024 at ADDA Conference hall, Asansol Paschim Bardhaman under RCFA Division-I PHE Dte. BILL/00935/2024-2025 240/24-25 23/08/2024 0 BLESSING ENTERPRISE 0.08 0.00 0
96 RCFA Division -I Arrangeme of tiffin packets for DWSM meeting held on 27.07.2024 at ADDA Conferene hall, Asansol, Paschim Bardhaman BILL/00936/2024-2025 241/24-25 23/08/2024 0 BLESSING ENTERPRISE 0.09 0.00 0
97 RCFA Division -I Installation of quick Heal Anti Viru for 3 years under RCFA Diivison-I PHE Dte. BILL/00937/2024-2025 245/24-25 27/08/2024 0 MUKHERJEE TRADERS 0.09 0.00 0
98 RCFA Division -I Way leave permission of 250 mm dia waer pipeline (Jal Jeevan Mision) near LC Gate No. 9/Spl/T near Pandabeswar Station in Asansol Divison of Eastern Railway by RCFA Division-I PHE Dte BILL/00987/2024-2025 415/24-25 05/12/2024 0 EASTERN RAILWAY 68.95 0.00 0
99 RCFA Division -I Fuel bill in faver of Ranajit auto for the month of july 2024 for one no vechile for office of the deputy superitending enginer RCFA W/S Circle PHE dte govt of west bengal BILL/00989/2024-2025 03/12/2024 0 RANAJIT AUTO 0.24 0.00 0
100 RCFA Division -I Fuel bill in faver of Ranajit auto for the month of October 2024 for one no vechile for office of the deputy superitending enginer RCFA W/S Circle PHE dte govt of west bengal BILL/00992/2024-2025 04/12/2024 0 RANAJIT AUTO 0.11 0.00 0
101 RCFA Division -I Acceptance cum work order for Laying of 110 mm dia HDPE Pipe line including concrete cutting mending etc allied works towards Pathakpara (Sansad-XV) Block Andal & Pandabeswar of Improvement of Ukhra Piped Water Supply Scheme under RCFA Division-I PHE Dte. BILL/01008/2023-2024 372/23-24 21/11/2023 0 B.T.M. CONCERN 2.14 0.00 0
102 RCFA Division -I Vehicle bill for 37 D 0482 Oct 2023 and nov 2023 BILL/01144/2023-2024 429/23-24 20/12/2023 0 SHYAMAL MAJI 0.30 0.00 0
103 RCFA Division -I Fuel bill for WB 37 D 0482 for Oct 23 and Nov 23 BILL/01145/2023-2024 430/23-24 20/12/2023 0 RANAJIT AUTO 0.29 0.00 0
104 RCFA Division -I Arrangement of breakfast and lunch box for DWSM meeting held on 13.01.2024 at ADDA Conference hall BILL/01309/2023-2024 494/23-24 25/01/2024 0 SHARMA ENGINEERING WORKS 0.10 0.00 0
105 RCFA Division -I Arrangemen of breakfast and lunch box for DWSM meeting held on 13.01.2024 at ADDA Conferenc hall BILL/01310/2023-2024 495/23-24 25/01/2024 0 SHARMA ENGINEERING WORKS 0.09 0.00 0
106 RCFA Division -I Permission for laying of water pipeline along NH-02 from Duburdih (km 441.780) to Kalla More (k. 462.080) and 1 no crossing across NH-2 in th state of West Bengal under Augmentation of RCFA Part II Piped Water Supply Scheme Volume -I (Intake, RWRM, WTP, CWRMs & GLRs) under RCFA Division-I PHE Dte. RCFA Division-I, PHE Dte. BILL/01344/2023-2024 545/23-24 08/02/2024 0 NATIONAL HIGHWAY AUTHORITY OF INDIA 169.62 0.00 0
107 RCFA Division -I Restoration work of damaged road flank caused by PHE for laying water pipe line at kajora Haripur from 0.00 km to 10.74 km at Ukhra Madhaigand road rom 0.00 to 12.13 km at Galigram - Kutruki - Chandipur road between 9 km to 12 km , Raghunathpur - Kantaberia road at 19th km near kantabaria Raghunathpur Kantaberia road from 0.00 kmp to 3.50 near Jamdoba village under Augmentation of RCFA Part II Piped Water Supply Scheme Volume -I (Intake, RWRM, WTP, CWRMs & GLRs) under RCFA Division-I PHE Dte. BILL/01345/2023-2024 544/23-24 08/02/2024 0 EXECUTIVE ENGINEER, ASANSOL HIGHWAY DIVISION, PW (ROADS) DIRECTT. 32.25 0.00 0
108 RCFA Division -I Damage of "PMGSY" and "Pathashree" Roads due to laying of PHED pipeline and tentative estimates for restoration BILL/01354/2023-2024 549/23-24 12/02/2024 0 WEST BENGAL STATE RURAL DEVELOPMENT AGENCY 46.78 0.00 0
109 RCFA Division -I Way leave / Track crossing proposal with Application ID : ER-ASN-2023-WL-66 dt 09.02.2024 under Augmentation of RCFA Part II Piped Water Supply Scheme Volume-II (Booster Stations & Allied Works) under RCFA Division-I PHE Dte. BILL/01359/2023-2024 559/23-24 20/02/2024 0 EASTERN RAILWAY 16.52 0.00 0
110 RCFA Division -I Way leave / Track crossing proposal with Application ID : ER-ASN-2023-WL-67 dt 09.02.2024 under Augmentation of RCFA Part II Piped Water Supply Scheme Volume-II (Booster Stations & Allied Works) under RCFA Division-I PHE Dte. BILL/01361/2023-2024 560/23-24 20/02/2024 0 EASTERN RAILWAY 10.41 0.00 0
111 RCFA Division -I Way leave / Track crossing proposal with Application ID : ER-ASN-2023-WL-69 dt 09.02.2024 under Augmentation of RCFA Part II Piped Water Supply Scheme Volume-II (Booster Stations & Allied Works) under RCFA Division-I PHE Dte. BILL/01362/2023-2024 561/23-24 20/02/2024 0 EASTERN RAILWAY 6.97 0.00 0
112 RCFA Division -I Way leave / Track crossing proposal with Application ID : ER-ASN-2023-WL-71 dt 09.02.2024 under Augmentation of RCFA Part II Piped Water Supply Scheme Volume-II (Booster Stations & Allied Works) under RCFA Division-I PHE Dte. BILL/01363/2023-2024 562/23-24 20/02/2024 0 EASTERN RAILWAY 7.84 0.00 0
113 RCFA Division -I Way leave / Track crossing proposal with Application ID : ER-ASN-2023-WL-65 dt 09.02.2024 under Augmentation of RCFA Part II Piped Water Supply Scheme Volume-II (Booster Stations & Allied Works) under RCFA Division-I PHE Dte. BILL/01364/2023-2024 563/23-24 20/02/2024 0 EASTERN RAILWAY 17.21 0.00 0
114 RCFA Division -I Way leave / Track crossing proposal with Application ID : ER-ASN-2023-WL-70 dt 09.02.2024 under Augmentation of RCFA Part II Piped Water Supply Scheme Volume-II (Booster Stations & Allied Works) under RCFA Division-I PHE Dte. BILL/01365/2023-2024 564/23-24 20/02/2024 0 EASTERN RAILWAY 7.84 0.00 0
115 RCFA Division -I Way leave / Track crossing proposal with Application ID : ER-ASN-2023-WL-68 dt 09.02.2024 under Augmentation of RCFA Part II Piped Water Supply Scheme Volume-II (Booster Stations & Allied Works) under RCFA Division-I PHE Dte. BILL/01366/2023-2024 565/23-24 20/02/2024 0 EASTERN RAILWAY 6.97 0.00 0
116 RCFA Division -I Way leave / Track crossing proposal with Application ID : ER-ASN-2023-WL-72 dt 09.02.2024 under Augmentation of RCFA Part II Piped Water Supply Scheme Volume-II (Booster Stations & Allied Works) under RCFA Division-I PHE Dte. BILL/01367/2023-2024 566/23-24 20/02/2024 0 EASTERN RAILWAY 6.97 0.00 0
117 RCFA Division -I Way leave / Track crossing proposal with Application ID : ER-ASN-2023-WL-93 dt 07.03.2024 under Augmentation of RCFA Part II Piped Water Supply Scheme Volume-II (Booster Stations & Allied Works) under RCFA Division-I PHE Dte. BILL/01538/2023-2024 623/23-24 14/03/2024 0 EASTERN RAILWAY 0.08 0.00 0
118 RCFA Division -I Way leave / Track crossing proposal with Application ID : ER-ASN-2023-WL-91 dt 07.03.2024 under Augmentation of RCFA Part II Piped Water Supply Scheme Volume-II (Booster Stations & Allied Works) under RCFA Division-I PHE Dte. BILL/01539/2023-2024 624/23-24 14/03/2024 0 EASTERN RAILWAY 0.09 0.00 0
119 RCFA Division -I Way leave / Track crossing proposal with Application ID : ER-ASN-2023-WL-08 dt 07.03.2024 under Augmentation of RCFA Part II Piped Water Supply Scheme Volume-II (Booster Stations & Allied Works) under RCFA Division-I PHE Dte. BILL/01540/2023-2024 625/23-24 14/03/2024 0 EASTERN RAILWAY 0.08 0.00 0
120 RCFA Division -I Way leave / Track crossing proposal with Application ID : ER-ASN-2023-WL-90 dt 07.03.2024 under Augmentation of RCFA Part II Piped Water Supply Scheme Volume-II (Booster Stations & Allied Works) under RCFA Division-I PHE Dte. BILL/01541/2023-2024 626/23-24 14/03/2024 0 EASTERN RAILWAY 0.09 0.00 0
121 RCFA Division -I Way leave / Track crossing proposal with Application ID : ER-ASN-2023-WL-92 dt 07.03.2024 under Augmentation of RCFA Part II Piped Water Supply Scheme Volume-II (Booster Stations & Allied Works) under RCFA Division-I PHE Dte. BILL/01542/2023-2024 627/23-24 14/03/2024 0 EASTERN RAILWAY 0.28 0.00 0
122 RCFA Division -I Way leave / Track crossing proposal with Application ID : ER-ASN-2023-WL-95 dt 07.03.2024 under Augmentation of RCFA Part II Piped Water Supply Scheme Volume-II (Booster Stations & Allied Works) under RCFA Division-I PHE Dte. BILL/01543/2023-2024 628/23-24 14/03/2024 0 EASTERN RAILWAY 0.08 0.00 0
123 RCFA Division -I Restoration of damaged road surface due to the cause of earthwork in connection with placement of under ground water pipe line in stretches at Pandabeswar-Natundanga Road from Chainage 0.000 km to 2.00 Km 2.500 to 3.000 Km 5.500 to 5.800 km, 7.900 km to 8.141 km in the district of Paschim Bardhaman under Asansol Division PWD BILL/01547/2023-2024 629/23-24 15/03/2024 0 EXECUTIVE ENGINEER, ASANSOL DIVISION, PWD 33.26 0.00 0
124 RCFA Division -I Supply of it peripherals BILL/01741/2023-2024 497/23-24 25/01/2024 0 MUKHERJEE TRADERS 0.43 0.00 0
125 RCFA Division -I Supply of computer desktop BILL/01742/2023-2024 498/23-24 25/01/2024 0 MUKHERJEE TRADERS 0.42 0.00 0
126 RCFA Division -I AMC for xerox machine BILL/01743/2023-2024 455/23-24 04/01/2024 0 WORK CHARGE BILL 0.21 0.00 0
127 RCFA Division -I Repair & maintenance on contract basis of computers and local area network under SERCFA Div-I PHE Dte. BILL/01745/2023-2024 499/23-24 01/02/2024 0 KALPANA ENTERPRISE 0.46 0.00 0
128 RCFA Division -I Hiring charge of Maxi cab (non conditioned) stage II / BS III for ofice use Veh WB 37 D 9526 BILL/01746/2023-2024 553/23-24 27/02/2024 0 NIRMALA TRADERS 0.06 0.00 0
129 RCFA Division -I Hirig of maxi cab state II/BS III for the office use of the Assistant Engineer BILL/01747/2023-2024 554/23-24 27/02/2024 0 NIRMALA TRADERS 0.06 0.00 0
130 RCFA Division -I Hire charges bill for vehicle no WB 37 D0482 for the month of January BILL/01748/2023-2024 570/23-24 27/02/2024 0 SHYAMAL MAJI 0.15 0.00 0
131 RCFA Division -I Fuel bill of Ranajit Auto vehicle no WB 37 D 0482 BILL/01749/2023-2024 571/23-24 27/02/2024 0 RANAJIT AUTO 0.19 0.00 0
132 RCFA Division -I Vehicle bill for the month of Dec 2023 BILL/01750/2023-2024 529/23-24 06/02/2024 0 SHYAMAL MAJI 0.15 0.00 0
133 RCFA Division -I Fuel bill for shyamal Maji for the month of Dec 23 BILL/01751/2023-2024 530/23-24 08/02/2024 0 RANAJIT AUTO 0.17 0.00 0
134 RCFA Division -I Acceptance cum work order for Rising Main for Improvement RCFA Part-I Water Supply Scheme for Salanpur and Barabani Block under RCFA Div-I PHE Dte. (Part B) ORD/000001/2022-2023 931/RCD-I 26/04/2022 736 M/S MONDAL ENTERPRISE 82.94 61.98 100
135 RCFA Division -I Formal work order for Distribution Network for RCFA Part-II Piped Water Supply Scheme Including FHTC & allied work under RCFA Division-I PHE Dte. (Zone 9B) (Part-B) ORD/000001/2023-2024 1348/RCD-I 04/04/2023 30 M/S SANTANU PALIT & CO. 156.13 33.23 30
136 RCFA Division -I Emergent sinking of one no 200 x 165 mm dia rig bore tube well at ESI Hospital near staff quarter Kali Mandir, Paschim Bardhaman under RCFA Division-I PHE Dte. ORD/000001/2024-2025 Camp_02_ESI_Hospital_AE_I 16/04/2024 7 M/S CHANDI CHARAN ROY 8.10 0.00 100
137 RCFA Division -I Acceptance cum work order for Distribution Network for Improvement RCFA Part-I Water Supply Scheme within command area of Zone-VI under RCFA Division-I PHE Dte. (Part-A) ORD/000002/2022-2023 932/RCD-I 26/04/2022 615 DIP CONSTRUCTION 61.83 51.53 100
138 RCFA Division -I Acceptance cum work order Additional work for sinking 3 nos 200 mm dia river bed tube wells and allied repairing work in river Damodar including surging of tube wells at Damalia H/W site under Tirat Mouza W/S Scheme under RCFA Division-I PHE Dte. (Sl No. 11) ORD/000002/2023-2024 1387/RCD-I 11/04/2023 12 D.S.C. CONCERN 6.88 6.87 0
139 RCFA Division -I Acceptance cum work order for Distribution Network for Improvement RCFA Part-I Water Supply Scheme within command area of Zone-VI under RCFA Division-I PHE Dte. (Part-B) ORD/000003/2022-2023 933/RCD-I 26/04/2022 90 M/S K & KONAR CONSTRUCTION 75.35 69.50 90
140 RCFA Division -I Formal work order for distribution network for RCFA Part-II Piped Water Supply including FHTC & allied work under RCFA Div-I, PHE Dte.(Zone-11) ORD/000003/2023-2024 1390/RCD I 11/04/2023 90 M/S SRI MAHADEO ENTERPRISES 294.95 254.37 85
141 RCFA Division -I Acceptance cum work order for Distribution Network for Improvement RCFA Part-I Water Supply Scheme within command area of Zone-IX under RCFA Division-I PHE Dte. (Part-A) ORD/000004/2022-2023 934/RCD-I 26/04/2022 90 SRI KRISHNA ENTERPRISE 86.98 30.45 65
142 RCFA Division -I Acceptance cum work order for Distribution Network for Improvement RCFA Part-I Water Supply Scheme within command area of Zone-IX under RCFA Division-I PHE Dte. (Part-B) ORD/000005/2022-2023 935/RCD-I 26/04/2022 90 KHEPI MAA TRADERS 71.89 67.45 75
143 RCFA Division -I Acceptance cum work order for Augmentation of RCFA Part-II Piped Water Supply Scheme (Zone-8) with Construction of 250 cum capacity RCC OHR with 20 mtr with staging height including Boundary Walls with gates and land Development, Drain and internal pathway at OHR site under Jamuria Block, District Paschim Bardhaman, (Sl No. 07). ORD/000005/2023-2024 1402 RCD I 12/04/2023 365 PINKI ENTERPRISE 95.85 86.37 65
144 RCFA Division -I Acceptance cum work order for Distribution Network for Improvement RCFA Part-I Water Supply Scheme within command area of Zone-XIII under RCFA Division-I PHE Dte. (Part-A) ORD/000006/2022-2023 936/RCD-I 26/04/2022 90 M/S MONI TRADERS 75.17 40.20 70
145 RCFA Division -I Acceptance cum work order for Construction of 200 cum capacity 20 mtr. Staging height RCC Over Head Reservoir (pipe connection and cost of pipes, speciials at jamgram Piped Water Supply Scheme under RCFA Division-I PHE Dte. in the District of Paschim Bardhaman. ORD/000006/2023-2024 1403 RCD I 12/04/2023 366 SRI KRISHNA ENTERPRISE 72.48 72.48 99
146 RCFA Division -I Acceptance cum Work Order for Construction of road at Runakuraghat H/W site including earth filling,treeguard making including repairing and restoration of rising main including collecting main under Augmentation of Panuria PWSS under RCFA Division-I PHE Dte. ORD/000006/2024-2025 1432/RCD-I 06/06/2024 45 SRI KRISHNA ENTERPRISE 58.57 57.74 100
147 RCFA Division -I Acceptance cum work order for Emergency supplying aligning and laying of different dia HDPE pipe line for by pass water supply arrangement to Roypara, Singhapara and adjacent areas under Ratibati Water Supply Scheme under RCFA Division-I PHE Dte. ORD/000007/2022-2023 937/RCD-I 26/04/2022 30 M/S MONDAL ENTERPRISE 24.23 24.17 0
148 RCFA Division -I Acceptance cum work Order for Repairing, Renovation, renewing & oversauling & obsolete i) for 2 nos. Iron Removal Plant (Pressure type) each capacity 45 cum/Hr at Churulia Head Work Site for Augmentation of Churulia W/S Scheme under RCFA Division-I PHE Dte. (Part-A) ii) for 3 nos. Iron Removal Plant (Pressure type of capacity 50 cum/hr 1no. & 75 cum/hr-2nos) at Madantore Head Works site for Madantore W/S Scheme under RCFA Division-I PHE Dte (Part-B) iii) for 4 nos. iron removal Plant (Pressure type) each capacity 20 cum /hr at Pandabeswar Head Works Site for Pandabeswar W/S Scheme under RCFA Division-I PHE Dte. (Part-C) iv) for 2 nos. iron Removal Plant (Pressure type) each capacity 50 cum/hr at Madanpur Head Work Site under RCFA Division-I PHE Dte. (Part-D). ORD/000009/2023-2024 1391/RCD I 11/04/2023 356 TARAPRASAD SARKAR 97.93 45.74 100
149 RCFA Division -I Acceptance cum work order for Distribution Network for Improvement RCFA Part-I Water Supply Scheme within command area of Zone-XIII under RCFA Division-I PHE Dte. (Part-B) (2nd Call) ORD/000010/2022-2023 1006/RCD-I 05/05/2022 60 M/S SANTANU PALIT & CO. 93.20 0.00 70
150 RCFA Division -I Acceptance cum work order for Distribution Network for Improvement RCFA Part-I Water Supply Scheme within command area of Zone-XIII under RCFA Division-I PHE Dte. (Part-D) (2nd Call) ORD/000011/2022-2023 1007/RCD-I 05/05/2022 90 GITASREE FABRICATION 77.41 66.72 85
151 RCFA Division -I Formal work order for Distribution Network for Improvement RCFA Part-I Water Supply Scheme within command area of Zone - I (Dendua OHR Site) under RCFA Division-I PHE Dte. (Part - B) ORD/000012/2022-2023 1020/RCD-I 06/05/2022 180 SWATI CORPORATION 149.90 63.87 85
152 RCFA Division -I Acceptance cum work order for Providing FHTC through Retrofitting at Barabani Zone PWSS, Block- Barabani of Improvement of Barabani Water supply scheme under RCFA Division-I, P.H.E. Dte. [Part-A] ORD/000013/2021-2022 950/RCD-I 07/06/2021 30 UMA ENTERPRISE 30.02 30.70 0
153 RCFA Division -I Formal Work Order for Distribution Network for Improvement RCFA Part-I Water Supply Scheme within command area of Zone - I (Dendua OHR Site) under RCFA Division-I PHE Dte. (Part - A) ORD/000013/2022-2023 1038/RCD-I 10/05/2022 1179 ASHA CONSTRUCTION 147.65 84.66 100
154 RCFA Division -I Formal Work Order for Distribution Network for Improvement RCFA Part-I Water Supply Scheme within command area of Zone - I (Dendua OHR Site) under RCFA Division-I PHE Dte. (Part - C) ORD/000014/2022-2023 1039/RCD-I 10/05/2022 1179 DAS & CHAKRABORTY 130.86 56.55 100
155 RCFA Division -I Acceptance cum work order for Protecting apparatus of collecting main including other allied works under RCFA Part-II PWSS (Zone-9) under RCFA Division-I PHE Dte. ORD/000014/2024-2025 1516/RCD-I 14/06/2024 15 MAKALI ENGINEERING CORPORATION 99.50 99.50 100
156 RCFA Division -I Acceptance cum work order for Providing FHTC through Retrofitting at Chotkara Kanskuli PWSS (Zone-I), Block- Salanpur & Barabani of Chotkara- Kanskuli Water supply scheme under RCFA Division-I, P.H.E. Dte. [Part-A] ORD/000015/2021-2022 952/RCD-I 07/06/2021 30 DIP CONSTRUCTION 23.01 46.10 0
157 RCFA Division -I Acceptance cum work order for Supply of different dia Sluice valve, including C.I. / D.I. Specials to the Searsole Store of RCFA Part-II (Zone-9) PWSS under RCFA Division-I PHE Dte. ORD/000015/2024-2025 1518/RCD-I 14/06/2024 15 MAKALI ENGINEERING CORPORATION 77.57 77.57 100
158 RCFA Division -I Acceptance cum work order for Providing FHTC through Retrofitting at Chotkara Kanskuli PWSS (Zone-I), Block- Salanpur & Barabani of Chotkara- Kanskuli Water supply scheme under RCFA Division-I, P.H.E. Dte. [Part-B] ORD/000016/2021-2022 953/RCD-I 07/06/2021 30 TARA MA ENTERPRISE 23.02 45.17 0
159 RCFA Division -I Formal Work order for Rising Main for Improvement RCFA Part-I Water Supply Scheme for Salanpur and Barabani Block under RCFA Division-I PHE Dte. (Part ¿ A) ORD/000016/2022-2023 1073/RCD-I 13/05/2022 719 MD AAMIR KHAN 115.25 75.01 90
160 RCFA Division -I Acceptance cum work order for Providing FHTC through Retrofitting at Chotkara Kanskuli PWSS (Zone-I), Block- Salanpur & Barabani of Chotkara- Kanskuli Water supply scheme under RCFA Division-I, P.H.E. Dte. [Part-C] ORD/000017/2021-2022 954/RCD-I 07/06/2021 30 PINKI ENTERPRISE 23.02 39.98 0
161 RCFA Division -I Acceptance cum work order for Providing FHTC through Retrofitting at Chotkara Kanskuli PWSS (Zone-I), Block- Salanpur & Barabani of Chotkara- Kanskuli Water supply scheme under RCFA Division-I, P.H.E. Dte. [Part-D] ORD/000018/2021-2022 955/RCD-I 07/06/2021 30 MD AAMIR KHAN 22.98 45.44 0
162 RCFA Division -I Plumbing works, sanitary fitting, flooring and other allied works of staff Quarter (Group A Type) and other allied works at Kalyaneswari township under RCFA Division-I PHE Dte.(Sl no 03) ORD/000018/2022-2023 1077/RCDI 13/05/2022 30 R B ENTERPRISE 3.89 3.82 100
163 RCFA Division -I Acceptance cum work order for Additional work for laying MS pipe and allied works including Adopting trench less technology (e.g. jack Pushing Method etc) for crossing of NH-60 near Pandabeswar H/W Site to carry 350 mm dia distribution & 250 mm dia rising main pipe line under RCFA Part-III Zone-I under RCFA Division-I PHE Dte. ORD/000018/2024-2025 1521/RCD-I 14/06/2024 45 HIRANMAY GHOSH 14.09 0.00 0
164 RCFA Division -I Acceptance cum work order for Providing FHTC through Retrofitting at Chotkara Kanskuli PWSS (Zone-II), Block- Salanpur & Barabani of Chotkara- Kanskuli Water supply scheme under RCFA Division-I, P.H.E. Dte. [Part-A] ORD/000019/2021-2022 956/RCD-I 07/06/2021 30 SUMIT BANERJEE 23.02 38.36 0
165 RCFA Division -I Repairing and renovation of staff quarter (Group A Type) and other allied works at Kalyaneswari Township under RCFA Division-I PHE Dte. (Sl No. 02) ORD/000019/2022-2023 1078/RCDI 13/05/2022 30 R B ENTERPRISE 4.86 4.72 100
166 RCFA Division -I Acceptance cum work order for Additional work for Jemua Water Supply Scheme at Gopalpur within Durgapur Faridpur Block for Augmentation of RCFA Part-III (Zone-II) PWSS under RCFA Division-I PHE Dte. ORD/000019/2024-2025 1522/RCD-I 14/06/2024 292 ASHA CONSTRUCTION 22.23 0.00 100
167 RCFA Division -I Acceptance cum work order for Providing FHTC through Retrofitting at Chotkara Kanskuli PWSS (Zone-II), Block- Salanpur & Barabani of Chotkara- Kanskuli Water supply scheme under RCFA Division-I, P.H.E. Dte. [Part-B] ORD/000020/2021-2022 957/RCD-I 07/06/2021 30 BABA LOKNATH ENTERPRISE 23.01 43.71 0
168 RCFA Division -I Acceptance cum work order for Sinking of 4 (Four) nos 200 mm dia Horizontal River Bed Tube Well with fitting of 200 mm dia Strainer (12.2 mtr) in river Ajay & Collecting line under RCFA Part-III Zone-I Water Supply Scheme under RCFA Division-I PHE Dte. ORD/000020/2024-2025 1523/RCD-I 14/06/2024 45 T M CONCRETE CREATION PVT.LTD 14.42 0.00 100
169 RCFA Division -I Acceptance cum work order for Providing FHTC through Retrofitting at Chotkara Kanskuli PWSS (Zone-II), Block- Salanpur & Barabani of Chotkara- Kanskuli Water supply scheme under RCFA Division-I, P.H.E. Dte. [Part-D] ORD/000021/2021-2022 958/RCD-I 07/06/2021 30 KHEPI MAA TRADERS 22.98 44.52 0
170 RCFA Division -I Acceptance cum work order for Additional laying of different dia HDPE pipe line at Madhudanga village and adjacent area within Jamuria Block under Augmentation of RCFA Part II Piped Water Supply Scheme Volume -I under RCFA Division-I PHE Dte. ORD/000021/2024-2025 1524/RCD-I 14/06/2024 45 MD AAMIR KHAN 20.30 17.53 100
171 RCFA Division -I Acceptance cum work order for Providing FHTC through Retrofitting at Chotkara Kanskuli PWSS (Zone-III), Block- Salanpur & Barabani of Chotkara- Kanskuli Water supply scheme under RCFA Division-I, P.H.E. Dte. [Part-A] ORD/000022/2021-2022 959/RCD-I 07/06/2021 30 JAYANTA DATTA 23.01 46.22 0
172 RCFA Division -I Acceptance cum work order for Providing FHTC through Retrofitting at Chotkara Kanskuli PWSS (Zone-III), Block- Salanpur & Barabani of Chotkara- Kanskuli Water supply scheme under RCFA Division-I, P.H.E. Dte. [Part-B] ORD/000023/2021-2022 960/RCD-I 07/06/2021 30 M/S MONDAL ENTERPRISE 23.00 40.38 0
173 RCFA Division -I Acceptance cum work order for Providing FHTC through Retrofitting at Chotkara Kanskuli PWSS (Zone-III), Block- Salanpur & Barabani of Chotkara- Kanskuli Water supply scheme under RCFA Division-I, P.H.E. Dte. [Part-D] ORD/000024/2021-2022 961/RCD-I 07/06/2021 30 S. CHAKRABORTY & CO. 22.97 45.64 0
174 RCFA Division -I Acceptance cum work order for Providing FHTC through Retrofitting at Chotkara Kanskuli PWSS (Zone-IV), Block- Salanpur & Barabani of Chotkara- Kanskuli Water supply scheme under RCFA Division-I, P.H.E. Dte. [Part-A] ORD/000025/2021-2022 962/RCD-I 07/06/2021 30 ASHA CONSTRUCTION 45.95 83.29 0
175 RCFA Division -I Acceptance cum work order for Providing FHTC through Retrofitting at Chotkara Kanskuli PWSS (Zone-IV), Block- Salanpur & Barabani of Chotkara- Kanskuli Water supply scheme under RCFA Division-I, P.H.E. Dte. [Part-B] ORD/000026/2021-2022 963/RCD-I 07/06/2021 30 DAS & CHAKRABORTY 45.92 88.99 0
176 RCFA Division -I Formal work order for Distribution Network for Augmentation of RCFA Part-II Piped Water Supply Scheme including FHTC & allied work under RCFA Division-I PHE Dte. (Zone-14A) ORD/000027/2023-2024 1617/RCD I 25/04/2023 180 KONAR CONSTRUCTION 365.88 115.24 35
177 RCFA Division -I Acceptance cum Work Order for Laying & Pushing by adopting trench less technology (e.g. jack Pushing Method etc) additional for Distribution Network of Augmentation of RCFA Part-II PWSS within command area of Vol-I (Segment-V) under RCFA Division-I PHE Dte. ORD/000028/2024-2025 1581/RCD-I 27/06/2024 30 DIP CONSTRUCTION 37.13 0.00 0
178 RCFA Division -I Formal work order for Distribution Network for Bagdiha Piped Water Supply Scheme at Jamuria Block including FHTC & allied work under RCFA Division-I PHE Dte. (Part-A) ORD/000029/2023-2024 1616/RCD I 25/04/2023 180 SIMA ENTERPRISE 115.57 81.84 75
179 RCFA Division -I Acceptance cum Work Order for Construction of Stack Yard (including filling of low land), Jungle cutting, Surface dressing, Dismantling related to RCFA Part-II WTP Site at Kalyaneswari Town ship under RCFA Division-I PHE Dte. Improvement of RCFA Part-II Vol-I ORD/000029/2024-2025 1582/RCD-I 27/06/2024 45 UNITED CONSTRUCTION 18.67 18.18 100
180 RCFA Division -I Formal work order for Supplying aligning and laying of different dia HDPE pipe line instead of DI pipe line and extension of HDPE pipe to adjacent village of Dendua for distribution system within command area of Zone-I (Dendua OHR Site) of Improvement of RCFA Part-I Piped Water Supply Scheme under RCFA Division-I PHE Dte. ORD/000030/2023-2024 1615/RCD I 25/04/2023 90 DAS & CHAKRABORTY 115.96 107.47 100
181 RCFA Division -I Formal work order for Supplying laying different HDPE Pipe line for Improvement of RCFA Part-I Water Supply Scheme within Command area of Zone-VIII with LDS work under RCFA Division-I PHE Dte. ORD/000031/2023-2024 1614/RCD I 25/04/2023 90 SWATI CORPORATION 128.33 22.19 80
182 RCFA Division -I Formal work order for Distribution Network for Augmentation of Jamuri (Rural) (Zone-I) RCFA Part-II Piped Water Supply Scheme including FHTC & allied work within Jamuria Block under RCFA Division-I PHE Dte. (Part-A). ORD/000032/2023-2024 1613/RCD I 25/04/2023 30 M/S B.K. CONSTRUCTION 132.16 76.95 65
183 RCFA Division -I Acceptance cum Work Order for Construction of CWR 150 cum at Shyamla for Kendra Khottamdihi of Augmentation of RCFA Part II Piped Water Supply Scheme Volume -I under RCFA Division-I PHE Dte. ORD/000033/2024-2025 1587/RCD-I 27/06/2024 90 SILPO UDYOG ENGINEERING CONSTRUCTIONS 28.76 21.95 90
184 RCFA Division -I Sinking of 4 (Four) nos river bed tube wells including collecting main at Runakuraghat for Flood damaged at river Ajoy under Chotkara Kanskuli water supply scheme under RCFA Division-I PHE Dte. (Sl No. 14) ORD/000034/2022-2023 1093/RCD I 13/05/2022 30 RELIABLE ENGINEERS CO-OP CONSTRUCTION SOCIETY LTD. 4.99 4.73 100
185 RCFA Division -I Formal work order for 200 mm, 160 mm & 90 mm dia HDPE PE-80 distribution network of RCFA Part-I Water Supply Scheme command area of Zone-IX under RCFA Div-I PHE Dte. ORD/000034/2023-2024 1612/RCD I 25/04/2023 90 KHEPI MAA TRADERS 149.55 53.69 90
186 RCFA Division -I Acceptance cum Work Order for Balance work of Distribution Network for Bagdiha Piped Water Supply Scheme at Jamuria Block including FHTC & allied work Augmentation of RCFA Part II Piped Water Supply Scheme Volume -I under RCFA Division-I PHE Dte. (Part-A) ORD/000034/2024-2025 1588/RCD-I 27/06/2024 45 SIMA ENTERPRISE 27.22 26.18 100
187 RCFA Division -I Formal work order for Distribution Network for Augmentation of RCFA Part-II Piped Water Supply Scheme including FHTC & Aallied work under RCFA Division-I PHE Dte. (Zone-19) (Part-B). ORD/000035/2023-2024 1611/RCD I 25/04/2023 180 UMA ENTERPRISE 195.63 64.28 65
188 RCFA Division -I Formal work order for Supplying aligning and laying of different dia HDPE pipe line instead of DI pipe line within distribution network within command are of Zone-I (Dendua OHR Site) of Improvement of RCFA Part-I Piped Water Supply Scheme under RCFA Division-I PHE Dte. ORD/000036/2023-2024 1610/RCD I 25/04/2023 90 SWATI CORPORATION 114.21 98.16 86
189 RCFA Division -I Formal work order for Distribution Network including FHTC & allied work at Ondal Block of RCFA Part-II (Zone-I) Pipe Water Supply Scheme under RCFA Division-I PHE Dte. ORD/000037/2023-2024 1609/RCD I 25/04/2023 90 GITA CONSTRUCTION 245.36 156.70 65
190 RCFA Division -I Formal work order for Distribution Network for RCFA Prt-II Pipe Water Supply scheme including FHTC & allied ork under RCFA Division-I PHE Dte. (Zone-9) Parshkol (Part-A) ORD/000038/2023-2024 1607/RCD I 25/04/2023 90 MD AAMIR KHAN 107.46 50.40 70
191 RCFA Division -I Acceptance cum work order for Providing FHTC through retrofitting at Saheb Bangla & allied areas at Khottamdihi Block Pandabeswar of Kendra Khottamdihi Water Supply Scheme under RCFA Division-I PHE Dte. ORD/000039/2021-2022 978/RCD-I 17/06/2021 1550 A.K. SIKDAR 19.13 26.36 100
192 RCFA Division -I Formal work word for Distribution Network for RCFA Part-II Pipe Water Supply Scheme including FHTC & allied work under RCFA Division-I PHE Dte. (Zone-16). ORD/000039/2023-2024 1606/RCD I 25/04/2023 251 JOY HIND TUBEWELLS 488.35 417.76 100
193 RCFA Division -I Formal work order for Distribution Network for Augmentation of RCFA Part-II Piped Water Supply Scheme including FHTC & allied Work under RCFA Division-I PHE Dte. (Zone-19)(Part-A) ORD/000040/2023-2024 1605/RCD I 25/04/2023 180 A. CONSTRUCTION CO. 233.19 92.45 70
194 RCFA Division -I Formal work order for Distribution Network for Augmentation of RCFA Part-II Piped Water Supply Scheme including FHTC & allied work under RCFA Division-I PHE Dte. (Zone-4A) (Part-A). ORD/000041/2023-2024 1604/RCD I 25/04/2023 180 PINKI ENTERPRISE 115.02 87.84 85
195 RCFA Division -I Acceptance cum work order for Additional work for Distribution Network for Augmentation of RCFA Part-II (Zone-19) (Part-A) Piped Water Supply Scheme under RCFA Division-I PHE Dte. ORD/000043/2024-2025 1644/RCD-I 04/07/2024 20 A CONSTRUCTION CO 9.41 9.41 100
196 RCFA Division -I Acceptance cum work order for Balance work of Laying distribution system within distribution network for Rangamati of Augmentation of Ground Water Based Water Supply Scheme for Bistupur under Division-I PHE Dte. ORD/000044/2024-2025 1645/RCD-I 04/07/2024 45 BASANTI TRADERS 18.35 4.71 50
197 RCFA Division -I Acceptance cum work order for Protecting apparatus of collecting main including other allied works under Augmentation of RCFA Part II Piped Water Supply Scheme Volume-II under RCFA Division-I PHE Dte. ORD/000050/2024-2025 1750/RCD-I 18/07/2024 20 MAKALI ENGINEERING CORPORATION 94.91 94.91 100
198 RCFA Division -I Acceptance cum Work Order for Additional for Distribution Network for Augmentation of RCFA Part II Piped Water Supply Scheme Volume-II (Part-4) Block-Andal, Dist-Paschim Bardhaman under RCFA Div-I PHE Dte. ORD/000051/2024-2025 1741/RCD-I 18/07/2024 45 UNITED CONSTRUCTION 30.14 29.22 85
199 RCFA Division -I Acceptance cum work order for Distribution Network for Augmentation of RCFA Part-II Piped Water Supply Scheme within command area of Zone-10 (Segment-IV) under RCFA Division-I PHE Division-I PHE Dte. (Sl No. 08). ORD/000053/2023-2024 1706/ RCD I 03/05/2023 90 DURGADAS MONDAL 85.16 45.25 55
200 RCFA Division -I Acceptance cum Work Order for Additional works of Concrete dismantling, Concrete restoration, Bolder cutting and other allied works at distribution network of Augmentation PWSS of RCFA Part-II (Zone-2A) under RCFA Div-I,PHE Dte. ORD/000053/2024-2025 1743/RCD-I 18/07/2024 255 SWATI CORPORATION 67.64 21.06 30
201 RCFA Division -I Acceptance cum work order Distribution Network for Augmentation of RCFA Part-II Piped Water Supply Scheme including FHTC & allied work under RCFA Division-I PHE Dte. (Zone-4A) (Part-D) (Sl No. 14) ORD/000054/2023-2024 1707/ RCD I 03/05/2023 90 MD. JAWED KHAN 69.87 49.08 80
202 RCFA Division -I Acceptance cum Work Order for Additional work along with Construction of Guard room with Toilet for Construction of 150 cum capacity RCC OHR with 20 Mtr staging height RCC Over Head Reservoir Piped connection and cost of pipes, specials at Augmentation of PWSS of RCFA Part-II (Zone-14C) Piped Water Supply Scheme under RCFA Division-I PHE Dte ORD/000054/2024-2025 1744/RCD-I 18/07/2024 256 NATIONAL CONSTRUCTION 12.73 2.98 85
203 RCFA Division -I Acceptance cum work order for Supply and delivery of C.I. Sluice valve and D.I Specials under Improvement of RCFA part-I Piped water Supply Scheme under RCFA Division-I PHE Dte. ORD/000055/2023-2024 1729/RCD-1 08/05/2023 10 SSPR VALVE MANUFACTURING PVT LTD 45.31 45.31 100
204 RCFA Division -I Acceptance cum work order for Requirement of different type water regulating apparatus including water leakage protection apparatus etc. for Kendra Khottamdihi Water Supply Scheme under RCFA Division-I PHE Dte. ORD/000056/2023-2024 1730/RCD-1 08/05/2023 10 MAKALI ENGINEERING CORPORATION 45.99 45.99 0
205 RCFA Division -I Acceptance cum Work Order for Supply and erection of Information Boards (31 nos) having M.S Channel/Angle posts and 1.5 mm thick M.S synthetic enamel paint over a coat of red oxide primer including lettering complete at different places under Salanpur ,Barabani, Andal ,Pandabeswar ,Raniganj and Durgapur Faridpur Block Augmentation of RCFA Part II Piped Water Supply Scheme Volume-II under RCFA Division-I PHE Dte. ORD/000056/2024-2025 1746/RCD-I 18/07/2024 15 UTTAR DINAJPUR ANKUR GRAM UNNAYAN SOCIETY 6.10 5.12 100
206 RCFA Division -I Acceptance cum work order Providing FHTC of retrofitting at Kumardihi village (Left out portion) of kumardiha Mouza, GP-Ratibati, Block Raniganj of Ratibati Water Supply Scheme under RCFA Division-I PHE Dte. (Sl No. 12) ORD/000057/2023-2024 1742/RCD I 11/05/2023 15 D.S.C. CONCERN 7.90 7.51 0
207 RCFA Division -I Acceptance cum Work Order for Supply and erection of Information Boards(43 nos)having M.S Channel/Angle posts and 1.5 mm thick M.S synthetic enamel paint over a coat of red oxide primer including lettering complete at different places under Jamuria Block Augmentation of RCFA Part II Piped Water Supply Scheme Volume-II under RCFA Division-I PHE Dte. ORD/000058/2024-2025 1748/RCD-I 18/07/2024 15 UNITED CONSTRUCTION 8.48 7.78 100
208 RCFA Division -I Acceptance cum Work Order for Protecting apparatus of collecting main including other allied works under Augmentation of RCFA Part II Piped Water Supply Scheme Volume-II under RCFA Division-I PHE Dte. ORD/000059/2024-2025 1751/RCD-I 18/07/2024 20 INDIA PIPE FITTING CO 93.63 93.56 100
209 RCFA Division -I Acceptance cum work order Repairing laying PVC pipe line and allied work at Asansol District Hospital under RCFA Division-I PHE Dte. (Sl. No. 34) ORD/000060/2023-2024 1751/RCD I 12/05/2023 15 UNITED CONSTRUCTION 3.23 3.23 0
210 RCFA Division -I Acceptance cum work order for Providing FHTC through Retrofitting at Chotkara Kanskuli PWSS (Zone-II), Block- Salanpur & Barabani of Chotkara- Kanskuli Water supply scheme under RCFA Division-I, P.H.E. Dte. [Part-C] (3rd Call) ORD/000061/2021-2022 1147/RCD-I 22/07/2021 30 GITASHREE FABRICATION 21.97 21.90 0
211 RCFA Division -I Acceptance cum work order for Providing FHTC through Retrofitting at Chotkara Kanskuli PWSS (Zone-III), Block- Salanpur & Barabani of Chotkara- Kanskuli Water supply scheme under RCFA Division-I, P.H.E. Dte. [Part-C] (3rd Call) ORD/000062/2021-2022 1148/RCD-I 22/07/2021 30 GITA CONSTRUCTION 22.58 45.26 0
212 RCFA Division -I Acceptance cum Work Order for Balance work of construction of CWR at Runakuraghat for Augmentation of Roshna Piped Water Supply Scheme under RCFA Division-I PHE Dte. ORD/000062/2024-2025 1590/RCD-I 27/06/2024 45 SAMIR KUMAR ROY CHOWDHURY 9.92 9.07 100
213 RCFA Division -I Construction of guard wall on emergency basis near Kalyaneswari I.B. gate under Retrofitting Bahula mouza RCFA Division-I PHE Dte. (Sl No. 12) ORD/000064/2022-2023 1111/RCDI 13/05/2022 30 R B ENTERPRISE 4.70 4.47 100
214 RCFA Division -I Formal work order Distribution Network including FHTC & alied work at Ondal Block of RCFA Part-II (Zone-12A) Piped Water Supply Scheme Under RCFA Division-I PHE Dte. ORD/000065/2023-2024 1764/RCD I 16/05/2023 930 MRITYUNJOY MUKHERJEE & CO. 610.49 195.98 70
215 RCFA Division -I Acceptance cum Work Order for Additional works for distribution network for RBTW water based water supply scheme for Sarpi and its joining mouza (Part-C) at Arati village including FHTC & allied works AUGMENTATION OF GROUND WATER BASED WATER SUPPLY SCHEME FOR AMLAJORA PART - II Durgapur-Faridpur Block under RCFA Division-I PHE Dte. ORD/000065/2024-2025 1795/RCD-I 24/07/2024 45 M/S BADAL GHOSH 44.53 37.53 100
216 RCFA Division -I Formal work order for Distribution Network Including FHTC & allied work at Ondal Block of RCFA Part-II (Zone-6) Piped Water Supply Scheme Under RCFA Division-I PHE Dte. ORD/000066/2023-2024 1763/RCD I 16/05/2023 930 MACHINO TECHNO 541.20 167.23 30
217 RCFA Division -I Formal work order for Distribution Network for Augmentation of RCFA Part-II Piped Water Supply Scheme including FHTC & allied work under RCFA Division-I PHE Dte. (Zone-13) ORD/000068/2023-2024 1762/RCD I 16/05/2023 180 MD AAMIR KHAN 308.67 170.31 80
218 RCFA Division -I Emergency basis construction of culvert near Kalyaneswari I.B. gate under Retrofitting Bahula mouza W/S Scheme under RCFA Division-I PHE Dte. (Sl No. 17) ORD/000069/2022-2023 1116/RCDI 13/05/2022 45 R B ENTERPRISE 4.93 4.92 100
219 RCFA Division -I Formal work order for Distribution Network for Augmentation of RCFA Part-II Piped Water Supply Scheme including FHTC & allied work under RCFA Division-I PHE Dte. (Zone-14B) ORD/000071/2023-2024 1761/RCD I 16/05/2023 961 MD AAMIR KHAN 409.77 65.24 15
220 RCFA Division -I Acceptance cum Work Order for Providing of different dia water regulating apparatus (cast iron and Ductile iron) of Augmentation of RCFA Part II Piped Water Supply Scheme Volume -I under RCFA Division-I PHE Dte. ORD/000072/2024-2025 1938/RCD-I 07/08/2024 15 MAKALI ENGINEERING CORPORATION 96.16 96.16 100
221 RCFA Division -I Formal work order for Distribution Network for Augmentation of RCFA Part-II Piped Water Supply Scheme including FHTC & allied work under RCFA Division-I Phe Dte. (Zone-9A) ORD/000073/2023-2024 1760/RCD I 16/05/2023 839 ASHA CONSTRUCTION 345.86 145.44 80
222 RCFA Division -I Formal Work Order for Pipe line crossing by adopting trench less technology (e.g. Jack Pushing Method etc) near Kanskuli DAM for dedicated pipe line towards Kanskuli village under Chotkara Kanskuli Water Supply Scheme under RCFA Division-I PHE Dte. ORD/000078/2023-2024 1772/RCD-I 18/05/2023 15 SRI KRISHNA ENTERPRISE 4.37 4.37 0
223 RCFA Division -I Acceptance cum Work Order for Realtime Water Quality Monitoring including 1 year maintenance for the OHR as hereunder RCFA Division-I PHE Dte. ORD/000079/2024-2025 2033/RCD-I 21/08/2024 455 MAXBRIDGE SOLUTIONS LLP 33.46 0.00 55
224 RCFA Division -I Acceptance cum work order for Additional for supplying & laying M.S pipe, Supplying specials for Interconnection work for Improvement of RCFA Part-I for Augmentation of RCFA Part-II (Zone-2) PWSS within command area of Zone-VIII under RCFA Div-I, PHE Dte. ORD/000085/2024-2025 2110/RCD-I 27/08/2024 25 TARA CONSTRUCTION 13.73 13.21 100
225 RCFA Division -I Acceptance cum work order for Allied works of Gopalpur site office including construction of pump house, premises development under Augmentation of Shyambazar water supply scheme of RCFA Division-I, PHE Dte. ORD/000086/2024-2025 2111/RCD-I 27/08/2024 181 BASANTI TRADERS 33.72 4.06 65
226 RCFA Division -I Acceptance cum work order for Construction of Chlorine Room of size (4.50 x 3.50 M) at (Zone-11) of Raniganj Block for Augmentation of RCFA Part-II Piped Water Supply Scheme under RCFA Division-I PHE Dte. in the District of Paschim Bardhaman ORD/000092/2023-2024 1755/RCD-I 12/05/2023 90 MAA DURGA ENTERPRISE 4.60 0.00 0
227 RCFA Division -I Formal work order for Augmentation of RCFA Part-II Piped Water Supply Scheme (Zone-19) with Construction of 600 cumcapacity RCC OHR with 20 mtr with staging height including Boundary Walls with gates and land Development, Drain and internal pathway at OHR site under Jamuria Block, District -Paschim Bardhaman. ORD/000094/2023-2024 1830/RCD-I 29/05/2023 365 SWATI CORPORATION 181.97 169.89 40
228 RCFA Division -I Acceptance cum work order for Construction of Additional works of Pump House and other allied works at Damalia H/W Site for Augmentation PWSS of RCFA Part-II (Zone-14C) under RCFA, Division-I, PHE Dte. ORD/000094/2024-2025 2128/RCD-I 27/08/2024 45 B.T.M. CONCERN 15.28 15.12 100
229 RCFA Division -I Formal Work Order for Distribution Network for Improvement RCFA Part-I Water Supply within command area of Zone-IX under RCFA Division-I PHE Dte. (Part C) ORD/000095/2022-2023 1213/RCD-I 30/05/2022 90 T M CONCRETE CREATION PRIVATE LIMITED 131.44 108.90 65
230 RCFA Division -I Formal Work Order for Distribution Network for Improvement RCFA Part-I Water Supply within command area of Zone-VI under RCFA Division-I PHE Dte. (Part ¿ C) ORD/000096/2022-2023 1214/RCD-I 30/05/2022 90 RANJIB GHATAK 100.72 90.61 90
231 RCFA Division -I Acceptance cum work order for Additional work of Construction of Rigid Pavement for the approach road from the main road towards Head Work Site and Laying of Pipe line for Pandebeswar Block of Augmentation PWSS of RCFA Part-II (Zone-19) under RCFA Division-I P.H.E Dte. in the District of Paschim Bardhaman ORD/000096/2024-2025 2127/RCD-I 27/08/2024 30 SWATI CORPORATION 10.61 0.00 100
232 RCFA Division -I Acceptance cum work order for Distribution Network for Augmentation of Jamgram Piped Water Supply Scheme Block Barabani, Dist- Paschim Bardhaman under RCFA Div-I PHE,Dte. (Part-B) ORD/000097/2022-2023 1270/RCD-I 02/06/2022 90 M/S S.K. ENTERPRISE 24.81 23.46 100
233 RCFA Division -I Continuation work order for Providing FHTC through Retrofitting at Salanpur Mouza, Vill-Salanpur, Block-Salanpur of Salanpur Water Supply Scheme under RCFA Division-I PHE Dte. ORD/000098/2021-2022 816/RCD-I 19/04/2021 45 GITA CONSTRUCTION 11.84 9.17 0
234 RCFA Division -I Acceptance cum work order for Distribution Network for Augmentation of Jamgram Piped Water Supply Scheme Block Barabani, Dist- Paschim Bardhaman under RCFA Div-I PHE Dte. (Part-C) ORD/000098/2022-2023 1271/RCD-I 02/06/2022 90 ALOKESH BANERJEE 23.92 23.08 80
235 RCFA Division -I Acceptance cum work order for Additional Work For Concrete , MS Girder In connection With source Augmentation of OCP Based PWSS of Kajora (Ghanashampur OCP ) including intake arrangement construction of steel Truss Bridge , Guard room ,CWR, Boundary wall, Laying of raising main, Land development etc, and other allied works of OCP Kajora PWSS under RCFA Division 1 PHE Dte. ORD/000098/2024-2025 2118/RCD-I 27/08/2024 445 MACHINO TECHNO 82.14 0.00 100
236 RCFA Division -I Acceptance cum work order for Distribution Network for Augmentation of Jamgram Piped Water Supply Scheme Block Barabani, Dist- Paschim Bardhaman under RCFA Div-I PHE,Dte. (Part-D) ORD/000099/2022-2023 1272/RCD-I 02/06/2022 90 B.T.M CONCERN 55.19 55.16 100
237 RCFA Division -I Formal work order for Augmentation of RCFA Part-II Piped Water Supply Scheme (Zone-10) with Construction of 350 cum capacity RCC OHR with 20 mtr with staging height including Boundary Walls with gates and land Development, Drain and internal pathway at OHR site under Jamuria Block, District-Paschim Bardhaman. ORD/000099/2023-2024 1845/RCD-I 31/05/2023 365 RUBY CONSTRUCTION 126.43 42.18 20
238 RCFA Division -I Acceptance cum work order for Distribution Network for Augmentation of Roshna Piped Water Supply Scheme Block Barabani, Dist- Paschim Bardhaman under RCFA Div-I PHE,Dte. (Part-B) ORD/000100/2022-2023 1273/RCD-I 02/06/2022 90 SRI KRISHNA ENTERPRISE 75.81 74.68 100
239 RCFA Division -I Acceptance cum work order for Distribution network for Augmentation of Jamuria Rural- II Piped Water Supply Scheme including FHTC work (Segment- I) under Jamuria Block in the district of Paschim Bardhaman Under RCFA Division - I PHE Dte. ORD/000100/2024-2025 2120/RCD-I 27/08/2024 60 SIMA ENTERPRISE 46.06 0.00 40
240 RCFA Division -I Acceptance cum work order for Distribution Network for Augmentation of Roshna Piped Water Supply Scheme Block Barabani, Dist- Paschim Bardhaman under RCFA Div-I PHE,Dte. (Part-C) ORD/000101/2022-2023 1274/RCD-I 02/06/2022 670 RUBY CONSTRUCTION 41.70 37.77 80
241 RCFA Division -I Formal work order for Augmentation of RCFA Part-II Piped Water Supply Scheme (zone-13) with Construction of 400 cum capacity RCC OHR with 20 mtr with staging height including Boundary Walls with gates and land Development, Drain ad internal pathway at OHR site under Jamuria Block, District- Paschim Bardhaman. ORD/000100/2023-2024 1844/RCD-I 31/05/2023 365 JAYANTA DATTA 129.69 99.19 65
242 RCFA Division -I Formal work order for Augmentation of RCFA Part-II Pipe Water Supply Scheme (Zone-15) with Construction of 450 cum capacity RCC OHR with 20 mtr with staging height including Boundary Walls with under Jamuria Block, District Paschim Bardhaman. ORD/000101/2023-2024 1843/RCD-I 31/05/2023 365 GITA CONSTRUCTION 150.65 0.00 0
243 RCFA Division -I Acceptance cum work order for Additional work for Laying 300 mm dia Raising Main through 600 mm dia MS pipe by trenchless technique under railway / NH / SH for the OCP base PWSS of Kajora (Ghanashampur OCP) of OCP Kajora PWSS under RCFA Division -1 PHE Dte. . ORD/000101/2024-2025 2121/RCD-I 27/08/2024 45 T M CONCRETE CREATION PVT.LTD 57.67 45.88 100
244 RCFA Division -I Providing FHTC through Retrofitting at Chatadhawra, Booth No. 02, Vill - Kendra, Block - Pandabeswar of Kendra Khottamdih Water Supply Scheme under RCFA Division-I PHE Dte. (Part-B) ORD/000102/2020-2021 1156 /RCD I 23/12/2020 20 A.K.CONSTRUCTION 4.43 6.18 0
245 RCFA Division -I Acceptance cum work order for Distribution Network for Augmentation of Roshna Piped Water Supply Scheme Block Barabani, Dist- Paschim Bardhaman under RCFA Div-I PHE,Dte. (Part-D) ORD/000102/2022-2023 1275/RCD-I 02/06/2022 90 JYOGOMAYA ENTERPRISE 28.02 28.01 100
246 RCFA Division -I Acceptance cum work order for Additional work for Road crossing of 250 mm dia Rising Main for under Augmentation of Amritnagar Zone-II Piped Water Supply Scheme under Raniganj Block under RCFA Division-I PHE Dte. ORD/000102/2024-2025 2122/RCD-I 27/08/2024 30 MD. JAWED KHAN 8.41 8.59 100
247 RCFA Division -I Providing FHTC through Retrofitting at Chatadhawra, Booth No. 02, Vill - Kendra, Block - Pandabeswar of Kendra Khottamdih Water Supply Scheme under RCFA Division-I PHE Dte. (Part-C) ORD/000103/2020-2021 1157/RCD I 23/12/2020 20 DHRUBA ENTERPRISE 4.45 6.13 0
248 RCFA Division -I Acceptance cum work order for Distribution Network including providing FHTC Work under Augmentation of Churulia and its adjoining mouzas (Zone-II) PWSS Block- Jamuira, Dist- Paschim Bardhaman under RCFA Div-I Phe,Dte. ORD/000103/2022-2023 1276/RCD-I 02/06/2022 90 MD AAMIR KHAN 70.29 48.29 100
249 RCFA Division -I Providing FHTC through Retrofitting at Metaldhaora, Booth No. 05, Vill - Kendra, Block - Pandabeswar of Kendra Khottamdih Water Supply Scheme under RCFA Division-I PHE Dte. (Part-A) ORD/000104/2020-2021 1158/RCD I 23/12/2020 20 M/S MONDAL CONSTRUCTION 4.44 6.17 0
250 RCFA Division -I Providing FHTC through Retrofitting at Metaldhaora, Booth No. 05, Vill - Kendra, Block - Pandabeswar of Kendra Khottamdih Water Supply Scheme under RCFA Division-I PHE Dte. (Part-B) ORD/000105/2020-2021 1159/RCD I 23/12/2020 20 VISUVIOUS 4.47 6.17 0
251 RCFA Division -I Formal Work Order for Improvement of RCFA Part-I Water Supply Scheme within command area of Zone-VIII with LDS & FHTC Work ORD/000105/2022-2023 1329/RCD-I 09/06/2022 180 SWATI CORPORATION 399.20 327.20 100
252 RCFA Division -I Providing FHTC through Retrofitting at Metaldhaora, Booth No. 05, Vill - Kendra, Block - Pandabeswar of Kendra Khottamdih Water Supply Scheme under RCFA Division-I PHE Dte. (Part-C) ORD/000106/2020-2021 1160/RCD I 23/12/2020 20 MS KALYAN ENTERPRISE 4.45 6.37 0
253 RCFA Division -I Acceptance cum work order Construction of drain at Dabor mouzas under RCFA Part-I W/S Scheme within command area of Zone-VII (Part-E) under RCFA Division-I PHE Dte. ORD/000106/2023-2024 1865/RCD-1 01/06/2023 60 TARA CONSTRUCTION 10.11 10.00 85
254 RCFA Division -I Acceptance cum Work Order for Providing FHTC through Retrofitting at Chelod Mouza, G.P.-Tirat, Block-Raniganj of Ratibati Water Supply Scheme under RCFA Division-I PHE Dte. (Sl No. 01) ORD/000108/2020-2021 1167/RCD-I 23/12/2020 30 MRITYUNJOY MUKHERJEE & CO. 37.97 31.34 0
255 RCFA Division -I Acceptance cum work order for Distribution Network for Augmentation of Sarisatali Piped Water Supply Scheme including FHTC Work Block Barabani, Dist- Paschim Bardhaman under RCFA Div-I PHE,Dte. (Part-A) ORD/000108/2022-2023 1277/RCD-I 02/06/2022 579 JAYANTA DATTA 32.82 24.10 85
256 RCFA Division -I Acceptance cum work order for Balance Work of Road Restoration In Connection With Improvement of RCFA _Part-I Water Supply Scheme for Amritnagar Zone-II of Augmentation PWSS of RCFA Part-II (Zone-14C) under RCFA Division PHE Dte. ORD/000108/2024-2025 2130/RCD-I 27/08/2024 30 T M CONCRETE CREATION PVT.LTD 48.27 47.82 100
257 RCFA Division -I Acceptance cum work order for Distribution Network for Augmentation of Sarisatali Piped Water Supply Scheme including FHTC work Block Barabani, Dist- Paschim Bardhaman under RCFA Div-I PHE,Dte. (Part-B) ORD/000109/2022-2023 1278/RCD-I 02/06/2022 90 MD. JAWED KHAN 38.01 29.87 0
258 RCFA Division -I Acceptance cum work order for Providing FHTC through Retrofitting at Chapui (CT) Mouza, G.P.-Ratibati, Block-Raniganj of Ratibati Water Supply Scheme under RCFA Division-I PHE Dte. (Sl No. 02) ORD/000110/2020-2021 1185/RCD-I 24/12/2020 30 SWATI CORPORATION 39.19 58.25 0
259 RCFA Division -I Acceptance cum work order Construction of Pump House at River side H/W for Augmentation Bagdiha Piped Water Supply Scheme under RCFA Division-I PHE Dte. ORD/000110/2023-2024 1867/RCD-1 01/06/2023 180 M/S KALYANI ENTERPRISE 19.55 0.00 0
260 RCFA Division -I Acceptance cum work order for Balance work for laying MS pipe and allied works including Adopting trench less technology (e.g. Jack Pushing Method etc) for crossing of important roads (2 nos location at zone-4A) of Augmentation PWSS of RCFA Part-II (Zone-2) under RCFA Division-I, P.H.E. Dte. ORD/000110/2024-2025 2132/RCD-I 27/08/2024 30 UNITED CONSTRUCTION 39.74 32.91 100
261 RCFA Division -I Acceptance cum Work Order for Providing FHTC through Retrofitting at Kumardiha Mouza, G.P.-Ratibati, Block-Raniganj of Ratibati Water Supply Scheme under RCFA Division-I PHE Dte. (Sl No. 03) ORD/000111/2020-2021 1186/RCD-I 24/12/2020 30 M/S B.K. CONSTRUCTION 19.63 35.64 0
262 RCFA Division -I Acceptance cum work order for Distribution Network for Augmentation of Sarisatali Piped Water Supply Scheme including FHTC Work Block Barabani, Dist- Paschim Bardhaman under RCFA Div-I PHE,Dte.(Part-C) ORD/000111/2022-2023 1279/RCD I 02/06/2022 90 M/S B.K. CONSTRUCTION 59.35 38.85 80
263 RCFA Division -I Acceptance cum work order for Additional work of Distribution Network for Augmentation of Jamuria (Rural) (Zone-II) Piped Water Supply Scheme including FHTC & allied work within Jamuria Block under RCFA Division-I PHE Dte. (Part- A) ORD/000111/2024-2025 2133/RCD-I 27/08/2024 146 M/S B.K. CONSTRUCTION 20.94 10.82 65
264 RCFA Division -I Acceptance cum work order for Providing FHTC through Retrofitting at Seora Mouza, G.P.- Ratibati, Block- Raniganj of Ratibati Water supply scheme under RCFA Division-I, P.H.E. Dte. (Sl No. 05) ORD/000112/2020-2021 1187/RCD-I 24/12/2020 30 A. CONSTRUCTION CO. 20.48 39.53 0
265 RCFA Division -I Acceptance cum work order for Sinking of 5 (five) nos. 200 mm dia river bed tube well in river Damodar including laying of collecting main (HDPE & MS) of Augmentation of Ondal (Phase-I & Phase-II) piped Water Supply Scheme under RCFA Division-I PHE Dte.(SL NO 6) ORD/000112/2022-2023 1287/RCD I 03/06/2022 30 DAS & CHAKRABORTY 75.11 36.68 100
266 RCFA Division -I Acceptance cum work order for Distribution network for Augmentation of Jamuria Rural-II Piped Water Supply Scheme including FHTC work (Segment-III) under Jamuria Block in the the District of Paschim Bardhaman under RCFA Division-I PHE Dte. ORD/000112/2024-2025 2134/RCD-I 27/08/2024 374 DAWN CONSTRUCTION 95.92 20.33 40
267 RCFA Division -I Acceptance cum work order for Providing FHTC through Retrofitting at Ratibati (Part-II), G.P.- Ratibati, Block- Raniganj of Ratibati Water supply scheme under RCFA Division-I, P.H.E. Dte. (Sl No. 06) ORD/000113/2020-2021 1188/RCD-I 24/12/2020 30 SOMNATH SAMANTA 22.88 40.00 0
268 RCFA Division -I Acceptance cum work order for Sinking of 2 (Two) no. 200 mm dia river bed tube well in the river Ajoy of Augmentation of Sarisatali Piped Water Supply Scheme under RCFA Division-I PHE Dte.(Sl No 07) ORD/000113/2022-2023 1281/RCD I 02/06/2022 30 MAA ENTERPRISE. 11.06 10.81 0
269 RCFA Division -I Acceptance cum work order for Providing FHTC through Retrofitting at ECL 2 Nos Colliery area, Vill - Kendra, Block - Pandabeswar of Kendra Khottamdih Water Supply Scheme under RCFA Division-I PHE Dte. (Sl No. 01) ORD/000114/2020-2021 1189/RCD-I 24/12/2020 30 GITASHREE FABRICATION 12.68 19.38 0
270 RCFA Division -I Acceptance cum work order for Sinking of 2 (Two) no. 200 mm dia river bed tube well in the river Ajoy of Augmentation of Churulia and its Adjoining Mouzas PWSS under RCFA Division-I PHE Dte.(SL NO 09) ORD/000114/2022-2023 1283/RCD I 02/06/2022 30 R B ENTERPRISE 13.00 8.20 80
271 RCFA Division -I Acceptance cum work order for Additional supplying laying and aligning of distribution system including FHTC for Shyamla in Chatrisganda Mouza, Block Jamuria Paschim Bardhaman under Augmentation of Madantore PWSS under RCFA Division-I PHE Dte. ORD/000114/2024-2025 2137/RCD-I 27/08/2024 45 DAWN CONSTRUCTION 38.00 33.69 100
272 RCFA Division -I Acceptance cum work order for Providing FHTC through Retrofitting at Mines Quarter Booth No. 3, Vill - Kendra, Block - Pandabeswar of Kendra Khottamdih Water Supply Scheme under RCFA Division-I PHE Dte. (Sl No. 02) ORD/000115/2020-2021 1190/RCD-I 24/12/2020 30 SIMA ENTERPRISE 9.93 12.38 0
273 RCFA Division -I Acceptance cum work order for Sinking of 2 (Two) no. 200 mm dia river bed tube well in the river Ajoy of Augmentation of Roshna Piped Water Supply Scheme under RCFA Division-I PHE Dte.(SL No 08) ORD/000115/2022-2023 1282/RCDI 02/06/2022 30 SRI KRISHNA ENTERPRISE 21.96 10.24 100
274 RCFA Division -I Acceptance cum work order for Construction of 1 (One) no. Chlorine Room including Plinth protection, drain for 900 cum and 250 cum OHR at Baliapur under Improvement of RCFA (Part-I) Piped Water Supply Scheme. under RCFA Division-I PHE Dte. ORD/000115/2024-2025 2138/RCD-I 27/08/2024 60 AMAR CONSTRUCTION 9.01 0.00 100
275 RCFA Division -I Acceptance cum work order for Providing FHTC through Retrofitting at Khottamdih Village, Vill - Kendra, Block - Pandabeswar of Kendra Khottamdih Water Supply Scheme under RCFA Division-I PHE Dte. (Sl No. 04) ORD/000117/2020-2021 1192/RCD-I 24/12/2020 30 M/S MONI TRADERS 14.10 19.45 0
276 RCFA Division -I Formal Work Order for Improvement of RCFA Part-I Water Supply Scheme within command area of Zone-V with LDS & FHTC work ORD/000117/2022-2023 1379/RCD-I 17/06/2022 180 MRITYUNJOY MUKHERJEE & CO. 466.46 346.89 80
277 RCFA Division -I Acceptance cum work order for Providing FHTC through Retrofitting at ECL 3 Nos Colliery area, Vill - Kendra, Block - Pandabeswar of Kendra Khottamdih Water Supply Scheme under RCFA Division-I PHE Dte. (Sl No. 05) ORD/000118/2020-2021 1193/RCD-I 24/12/2020 30 RELIABLE ENGINEERS CO-OP CONSTRUCTION SOCIETY LTD. 16.09 22.77 0
278 RCFA Division -I Formal Work Order for Augmentation of Churulia and its adjoining mouzas (Zone-I) PWSS by construction of OHR of capacity 100 cum with 20 mtr staging height LDS with necessary interconnection & FHTC work Block-Jamuria, Dist-Paschim Bardhaman under RCFA Division-I PHE Dte. ORD/000118/2022-2023 1372/RCD-I 16/06/2022 1172 ASHA CONSTRUCTION 306.57 156.81 100
279 RCFA Division -I Acceptance cum work order for Distribution network for Augmentation of Jamuria Rural- II Piped Water Supply Scheme including FHTC work (Segment- II) under Jamuria Block in the district of Paschim Bardhaman under RCFA Division - I PHE Dte. ORD/000118/2024-2025 2117/RCD-I 27/08/2024 804 MS SAMANTA CONSTRUCTION 48.54 0.00 100
280 RCFA Division -I Acceptance cum work order for Providing FHTC through Retrofitting at Kendra Mouza, Booth No. 1 (Kendra Gram), Vill - Kendra, Block - Pandabeswar of Kendra Khottamdih Water Supply Scheme under RCFA Division-I PHE Dte. (Part-A) (Sl No. 06) ORD/000119/2020-2021 1194/RCD-I 24/12/2020 30 DURGADAS MONDAL 9.08 10.62 0
281 RCFA Division -I Acceptance cum work order for Distribution Network for Improvement RCFA Part-I Water Supply Scheme within command area of Zone-XIII under RCFA Division-I PHE Dte. (Part-C) ORD/000119/2022-2023 1605/RCD-I 06/07/2022 90 PINKI ENTERPRISE 78.73 37.76 80
282 RCFA Division -I Acceptance cum work order for Construction of Visiter room and driver rest room at office premises Augmentation of RCFA Part II Piped Water Supply Scheme Volume-II under RCFA Division-I PHE Dte. ORD/000120/2024-2025 2155/RCD-I 29/08/2024 90 G. CONSTRUCTION 18.48 15.51 100
283 RCFA Division -I Acceptance cum work order for Distribution Network for Augmentation of Roshna Piped Water Supply Scheme including FHTC Work and Construction of 300 cum capacity 20 Mtr staging height RCC Over Head Reservoir Block Barabani, Dist - Paschim Bardhaman under RCFA Division-I PHE Dte. (Part-A) ORD/000121/2022-2023 1607/RCD-I 06/07/2022 180 SRI KRISHNA ENTERPRISE 163.56 163.51 100
284 RCFA Division -I Providing FHTC through Retrofitting at Chatadhawra, Booth No. 02, Vill - Kendra, Block - Pandabeswar of Kendra Khottamdih Water Supply Scheme under RCFA Division-I PHE Dte. (Part-A) ORD/000122/2020-2021 1155/RCD I 23/12/2020 20 ZEROTH CONTROL SYSTEM 4.40 5.68 0
285 RCFA Division -I Acceptance cum work order for Distribution Network for Augmentation of Ondal Phase-I Piped Water Supply Scheme including FHTC & allied work within Ondal Block under RCFA Division-I PHE Dte. (Part-A) ORD/000122/2022-2023 1608/RCD-I 06/07/2022 1057 AMAR CONSTRUCTION 53.68 31.30 100
286 RCFA Division -I Acceptance cum work order for Distribution Network for Augmentation of Ondal Phase-I Piped Water Supply Scheme including FHTC & allied work within Ondal Block under RCFA Division-I PHE Dte. (Part-B) ORD/000123/2022-2023 1609/RCD-I 06/07/2022 90 UMA ENTERPRISE 67.49 65.53 100
287 RCFA Division -I Acceptance cum work order for Distribution Network for Improvement RCFA Part-I Water Supply Scheme within command area of Zone-VII under RCFA Division-I PHE Dte. (Part-A) ORD/000124/2022-2023 1610/RCD-I 06/07/2022 990 RELIABLE ENGINEERS CO-OP CONSTRUCTION SOCIETY LTD. 64.62 18.73 100
288 RCFA Division -I Acceptance cum work order for Distribution Network for Improvement RCFA Part-I Water Supply Scheme within command area of Zone-VII under RCFA Division-I PHE Dte. (Part-B) ORD/000125/2022-2023 1611/RCD-I 06/07/2022 1365 UNITED CONSTRUCTION 55.84 26.44 75
289 RCFA Division -I Acceptance cum work order for Distribution Network for Improvement RCFA Part-I Water Supply Scheme within command area of Zone-VII under RCFA Division-I PHE Dte. (Part-C) ORD/000126/2022-2023 1612/RCD-I 06/07/2022 90 PINKI ENTERPRISE 60.85 21.88 65
290 RCFA Division -I Acceptance cum work order for Distribution Network for Improvement RCFA Part-I Water Supply Scheme within command area of Zone-VII under RCFA Division-I PHE Dte. (Part-D) ORD/000127/2022-2023 1613/RCD-I 06/07/2022 90 KONAR CONSTRUCTION 64.73 23.94 75
291 RCFA Division -I Acceptance cum work order for Distribution Network for Improvement RCFA Part-I Water Supply Scheme within command area of Zone-VII under RCFA Division-I PHE Dte. (Part-E) ORD/000128/2022-2023 1614/RCD-I 06/07/2022 90 TARA CONSTRUCTION 88.30 43.84 70
292 RCFA Division -I Acceptance cum work order for Providing FHTC work for the Command area of Zone-XI (Part-7 Segment) for Improvement of RCFA Part-I Water Supply Scheme under RCFA Division-I PHE Dte ORD/000130/2022-2023 1702/RCD-I 14/07/2022 45 UNITED CONSTRUCTION 20.25 19.99 5
293 RCFA Division -I Acceptance cum work order for Providing FHTC work for the Command area of Zone-XI (Part-9 Segment) for Improvement of RCFA Part-I Water Supply Scheme under RCFA Division-I PHE Dte ORD/000131/2022-2023 1703/RCD-I 14/07/2022 45 SOMNATH SAMANTA 28.67 0.00 5
294 RCFA Division -I Acceptance cum work order for Supply & erection on Information Boards (51 nos) having M.S. Channel/Angle posts & 1.5 mm thick M.S Synthetic enamel paint over a coat of red oxide primer including lettering complete at different places under Salanpur, Barabani & Jamuria Block for Augmentation of RCFA Part II Piped Water Supply Scheme Volume -I under RCFA Division-I PHE Dte. ORD/000136/2024-2025 2231/RCD-| 10/09/2024 15 SHARMA ENGINEERING WORKS 9.90 9.86 100
295 RCFA Division -I Extension of different dia HDPE pipe line for providing FHTC at Parulberia and allied villages (Part-B) under Roshna W/S Scheme under RCFA Division-I PHE Dte. ORD/000138/2022-2023 1432/RCD I 27/06/2022 45 MD SARFARAZ ALAM 4.98 4.65 0
296 RCFA Division -I Acceptance cum work order for Protecting and regulating apparatus for distribution system and rising main under Augmentation of RCFA Part II Piped Water Supply Scheme Volume -I under RCFA Division-I PHE Dte ORD/000138/2024-2025 2232/RCD-i 10/09/2024 30 MAKALI ENGINEERING CORPORATION 94.06 93.98 100
297 RCFA Division -I Supplying, aligning & Laying of different dia HDPE pipe line for providing FHTC to Manahora, Kanskuli (Part) and Kalisanko villages under Chotkara Kanskuli W/S Scheme under RCFA Division-I PHE Dte. (Sl No. 02) ORD/000139/2022-2023 1433/RCD I 27/06/2022 45 GITASREE FABRICATION 1.97 1.76 0
298 RCFA Division -I Supply & erection of Govt. Land Boards ( 102 nos) having M.S. Channel/Angle posts& 1.5 mm thick M.S synthetic enamel paint over a coat of red oxide primer including lettering complete at different places under Jamuria Block for Augmentation of RCFA Part II Piped Water Supply Scheme Volume-I under RCFA Division-I PHE Dte. ORD/000139/2024-2025 Camp-02-Jamuria-AE/2024-2 20/08/2024 15 UNITED CONSTRUCTION 20.45 19.85 100
299 RCFA Division -I Supplying, aligning & Laying of different dia HDPE pipe line for providing FHTC at Parulberia and allied villages (Part-A) under Roshna W/S Scheme under RCFA Division-I PHE Dte. (Sl No. 03) ORD/000140/2022-2023 1434/RCD I 27/06/2022 45 MD AAMIR KHAN 5.00 4.00 0
300 RCFA Division -I Acceptance cum work order for Separate connection for Ijjatgunj OHR Kanksa Zone-II (Part-C) under RCFA Division - I PHE Dte. ORD/000141/2024-2025 2245/RCD-I 11/09/2024 30 COMPUTER MEDIA 6.62 0.00 70
301 RCFA Division -I Extension of different dia HDPE pipe line for providing FHTC at Gourbazar, Bindudihi, Hosenpara villages under Gourbazar W/S Scheme under RCFA Division-I PHE Dte. (Sl NO. 05) ORD/000142/2022-2023 1436/RCD I 27/06/2022 45 M/S S.K. ENTERPRISE 4.97 4.48 0
302 RCFA Division -I Extension of different dia HDPE pipe line for providing FHTC at Putulia (Part), Kharboni, Jamjuri and allied villages under Gourbazar W/S Scheme under RCFA Division-I PHE Dte. (Sl No. 06) ORD/000143/2022-2023 1437/RCD I 27/06/2022 45 VISUVIOUS 2.75 2.35 0
303 RCFA Division -I Extension of different dia HDPE pipe line for providing FHTC at Roshna & Baspahari villages under Roshna W/S Scheme under RCFA Division-I PHE Dte. (Sl No. 07) ORD/000144/2022-2023 1438/RCD I 27/06/2022 45 SHREE DURGA ENTERPRISE 3.22 3.10 0
304 RCFA Division -I Laying of HDPE pipe line and other repairing work of distribution at Ratibati Water Supply Scheme under RCFA Division-I PHE Dte. (Sl No. 15) ORD/000152/2022-2023 1446/RCD I 27/06/2022 45 M/S MONDAL ENTERPRISE 2.54 2.49 0
305 RCFA Division -I Formal work order for Construction of 450 cum capacity 20 mtr. staging height RCC Over Head Reservoir (Pipe connection and cost of pipes. specials at Raniganj Block (Zone-18) for Augmentation of RCFA Part-II piped Water Supply Scheme under RCFA Division-I PHe Dte. in the District of Paschim Bardhaman. Ref Drawing No. PC-I/OHR/04/2022 (Sheet No. 1 & 2) ORD/000154/2023-2024 1901/RCD-I 09/06/2023 366 SRI KRISHNA ENTERPRISE 130.86 39.26 20
306 RCFA Division -I Formal work order for Augmentation of RCFA part-II Piped Water Supply Scheme (Zone-7) with Construction of 450 cum capacity RCC OHR with 20 mtr with staging height including Boundary Walls with gates and land Development, Drain and internal pathway at OHR site under Jamuria Block, District Paschim Bardhaman. ORD/000155/2023-2024 1900/RCD-I 09/06/2023 365 TARAPRASAD SARKAR 150.41 21.85 25
307 RCFA Division -I Acceptance cum work order for Supplying, aligning and laying of DI & HDPE pipe line for water supply arrangement to Kumardiha village under Ratibati W/S Scheme under RCFA Division-I PHE Dte. ORD/000156/2021-2022 1584/RCD-I 07/09/2021 30 M/S MONDAL ENTERPRISE 20.03 19.90 0
308 RCFA Division -I Acceptance cum work order for Providing FHTC work for the Command area of Zone-XI (Part-4 Segment) for Augmentation of Madantore Piped Water Supply Scheme under RCFA Division-I PHE Dte ORD/000157/2022-2023 1708/RCD-I 15/07/2022 881 DAWN CONSTRUCTION 48.67 32.88 100
309 RCFA Division -I Formal work order for Construction of 900 cum capacity 20 mtr staging height RCC Over Head Reservoir (pipe connection and cost of pipes, specials at Amritnagar Zone-II Piped Water Supply Scheme under RCFA Division-I, PHE Dte. in the District of Paschim Bardhaman. ORD/000157/2023-2024 1902/RCD-I 09/06/2023 245 M/S SANTANU PALIT & CO. 182.70 127.89 70
310 RCFA Division -I Acceptance cum work order for Providing FHTC work for the Command area of Zone-XI (Part-5 Segment) for Improvement of RCFA Part-I Water Supply Scheme under RCFA Division-I PHE Dte ORD/000158/2022-2023 1707/RCD-I 14/07/2022 45 M/S B.K. CONSTRUCTION 32.05 20.27 100
311 RCFA Division -I Continuation work order for Laying & Pushing of 600 mm dia MS Water Carrier pipe and road Crossing by adopting trench less technology at Dendua more to Kalyaneswari road of Improvement of RCFA Part-I in connection of rising main (Part-A) under RCFA Division-I PHE Dte. ORD/000158/2023-2024 1883/1/RCD-I 07/06/2023 15 MD AAMIR KHAN 66.19 66.19 0
312 RCFA Division -I Acceptance cum work order for Laying of different dia UPVC/HDPE pipe line for extension of distribution system regarding FHTC work at Kumardiha mouza of Ratibati water supply scheme under RCFA Div-I PHE Dte. ORD/000160/2021-2022 1585/RCD-I 07/09/2021 30 M/S B.K. CONSTRUCTION 14.42 13.73 0
313 RCFA Division -I Continuation work order for Hiring of SUV (A.C) (Non Airconditioned) Bharat Stage-IV/BS-IV purchased on or after 01.01.2022 with Diesel/LPG/CNG Engine. for the Office Use of the Deputy Superintending Engineer, RCFA W/S Circle, Public Health Engineering Directorate, Govt. of West Bengal (w.e.f. 01.09.2024 to 28.02.2025) (Sl No. 02) ORD/000160/2024-2025 2164_RCD-I 30/08/2024 182 SHYAMAL MAJI 0.90 0.33 33
314 RCFA Division -I Acceptance cum work order for Additional work of Morum cutting, concrete cutting, Hard rock cutting, Bituminus Road cutting different dia DI (K-7) & HDPE pipe line with other allied works from Dabor OHR Zone-II (Pahargara, Mohanpur, Partabpur, Bolkundi etc) distribution under Retrofitting Chotkara-Kanskuli W/S Scheme Zone II under RCFA Division-I PHE Dte. ORD/000161/2021-2022 1586/RCD-I 07/09/2021 30 DAS & CHAKRABORTY 11.29 10.88 0
315 RCFA Division -I Acceptance cum work order for Providing FHTC work for the Command area of Zone-XI (Part-6 Segment) for augmentation of Itapara piped Water Supply Scheme under RCFA Division-I PHE Dte ORD/000161/2022-2023 1699/RCD-I 13/07/2022 923 UMA ENTERPRISE 44.47 16.76 45
316 RCFA Division -I Acceptance cum work order for Repairing and renovation of Rupnarayanpur OHR of Capacity 1135 cum staging height 20 mtr under RCFA Part-I W/S Scheme under RCFA Division-I PHE Dte. ORD/000163/2021-2022 1588/RCD-I 07/09/2021 30 BKB INFRA PROJECTS PVT LTD 37.48 37.45 0
317 RCFA Division -I Acceptance cum work order for Providing FHTC work for the Command area of Zone-XI (Part-8 Segment) for Improvement of RCFA Part-I Water Supply Scheme under RCFA Division-I PHE Dte ORD/000163/2022-2023 1712/RCD-I 15/07/2022 45 SIMA ENTERPRISE 24.13 0.00 5
318 RCFA Division -I Continuation work order for Pipe line crossing by adopting trench less technology (e.g. Jack Pushing Method etc) at 7 Nos. location at Zone-V area Improvement of RCFA Part-I Piped Water Supply Scheme under RCFA Division-I PHE Dte. ORD/000164/2023-2024 1911/RCD-I 14/06/2023 30 MRITYUNJOY MUKHERJEE & CO. 19.62 15.26 80
319 RCFA Division -I Formal Work Order for Construction of Sub-station, CWR and Pump House including toilet at Ethora under Improvement of RCFA Part-I Piped Water Supply Scheme under RCFA Division-I PHE Dte. ORD/000173/2023-2024 2009/RCD-I 26/06/2023 120 D.S. ENTERPRISE 122.25 43.74 40
320 RCFA Division -I Acceptance cum work order for Balance work for pushing 300 mm dia MS Rising main through 600 mm Dia RCC pipe road crossing trenchless method under NH-19 at front topline more under OCP based Kajora site Augmentation of sub surface water supply scheme ondal phase-II/A under RCFA Division-I PHE Dte. ORD/000179/2024-2025 2427/RCD-I 26/09/2024 30 T M CONCRETE CREATION PVT.LTD 12.98 0.00 100
321 RCFA Division -I Acceptance cum work order for Carriage DI pipe & specials from Searsole to Andal for rising main pipeline work at Andal block of Augmentation of sub surface water supply scheme for Andal Phase-II/B RCFA Division-I ,PHE Dte ORD/000180/2024-2025 2428/RCD-I 26/09/2024 15 MRITYUNJOY MUKHERJEE & CO. 5.04 0.00 10
322 RCFA Division -I Acceptance cum work order for Allied work of 600 mm Dia RCC pipe road crossing trenchless method jack pushing under NH-19 at Railway Kajora more to Andal Police station under OCP based KAJORA of Augmentation sub surface water supply scheme Ondal Phase-II/B under RCFA Division-I PHE, Dte ORD/000183/2024-2025 2431/RCD-I 26/09/2024 60 T M CONCRETE CREATION PVT.LTD 73.64 73.64 100
323 RCFA Division -I Formal Work Order for Construction of 350 cum capacity 20 mtr. staging height RCC Over Head Reservoir (pipe connection and cost of pipes, specials at Bagdiha for Augmentation of Bagdiha Piped Water Supply Scheme under RCFA Division-I PHE Dte. in the District of Paschim Bardhaman. Ref Drawing No. PC-I/OHR/12/2012 (Sheet No. 1 & 2) ORD/000184/2023-2024 2042/RCD-I 04/07/2023 366 DHANANJOY DUTTA 108.00 59.72 50
324 RCFA Division -I Acceptance cum work order for Providing FHTC through Retrofitting at Daskeary Village Block-Barabani under Roshna Water supply scheme under RCFA Division-I, P.H.E. Dte. ORD/000188/2021-2022 1862/RCD-I 28/10/2021 30 M/S MONI TRADERS 39.47 35.31 0
325 RCFA Division -I Acceptance cum work order for Providing FHTC through Retrofitting at Roshna (Part) Block-Barabani under Roshna Water supply scheme under RCFA Division-I, P.H.E. Dte. ORD/000189/2021-2022 1863/RCD-I 28/10/2021 30 SRI KRISHNA ENTERPRISE 12.81 9.39 0
326 RCFA Division -I Acceptance cum work order for Providing FHTC through Retrofitting at Parulberia Mouza Block-Barabani under Roshna Water supply scheme under RCFA Division-I, P.H.E. Dte. ORD/000190/2021-2022 1864/RCD-I 28/10/2021 30 MAK CONSTRUCTION CO. 20.28 17.74 0
327 RCFA Division -I Acceptance cum work order for Providing FHTC through Retrofitting at Gourbazar Village, Block-Barabani under Gourbazar Water supply scheme under RCFA Division-I, P.H.E. Dte. ORD/000191/2021-2022 1865/RCD-I 28/10/2021 30 M/S S.K. ENTERPRISE 13.17 12.21 0
328 RCFA Division -I Acceptance cum work order for Providing FHTC through Retrofitting at Putulia (Part), Block-Barabani under Gourbazar Water supply scheme under RCFA Division-I, P.H.E. Dte. ORD/000192/2021-2022 1866/RCD-I 28/10/2021 30 VISUVIOUS 12.85 10.95 0
329 RCFA Division -I Formal work order for Source Augmentation of OCP based PWSS of Kajora (Ghanashampur OCP) including, Intake Arrangement, Construction of Steel Truss Bridge, Guardroom, CWR, Boundary Wall, Laying of Rising Main, Land Development etc. & other allied works of OCP Kajora PWSS under RCFA Division-I PHE Dte. ORD/000192/2023-2024 2148/RCD-I 12/07/2023 275 MRITYUNJOY MUKHERJEE & CO. 120.71 119.78 16
330 RCFA Division -I Hiring of maxi cab (Non-airconditioned)Bharat stage-II/BS-II purchased on or after 01.05.2008 with diesel/LPG/CNG engine for the office use of the Assistant Engineer, RCFA Div-I, PHE dte, Govt of West Bengal (w.e.f 01.09.2021 to 31.08.2022) ORD/000194/2021-2022 1541/RCD I 31/08/2021 365 KHEPI MAA TRADERS 1.73 3.07 0
331 RCFA Division -I Acceptance cum work order for Providing of different dia of water regulating apparatus and other allied works (Part-A) under Augmentation of RCFA Part II Piped Water Supply Scheme Volume-II under RCFA Division-I PHE Dte. ORD/000196/2024-2025 2451/RCD-I 30/09/2024 15 MAKALI ENGINEERING CORPORATION 78.04 78.04 100
332 RCFA Division -I Acceptance cum work order for Additional work related to shifting Rising main, laying of distribution network, Road restoration and other allied work for Ondal Block of Augmentation PWSS of RCFA Part-II (Zone - 9) under RCFA Division-I PHE Dte. ORD/000199/2024-2025 2457/RCD-I 01/10/2024 30 M/S UNIT CONSTRUCTION 45.22 0.00 100
333 RCFA Division -I Hiring of Maxi Cab (Non Air-conditioned)(Bharat stage-III/BS-III purchased on or after 01.05.2008 with Diesel/LPG/CNG Engine. as when required basis for supervision of FHTC related works under JJM) of RCFA Div-I, PHE Dte Govt, of West Bengal (w.e.f 16.08.2022 to 15.08.2023) ORD/000204/2022-2023 1907/RCDI 12/08/2022 12 PRAMIT CHATTERJEE 1.80 0.79 0
334 RCFA Division -I Acceptance cum work order for Construction of 250 cum capacity 20 Mtr staging height RCC Over Head Reservoir (Pipe connection and cost of pipes, specials at (Zone-VI) for Improvement of RCFA Part-I Piped Water Supply Scheme under RCFA Division-I PHE Dte. in the District of Paschim Bardhaman ORD/000205/2022-2023 1874/RCD-I 04/08/2022 12 KAMIRUL SK & CO 76.60 68.94 100
335 RCFA Division -I Acceptance cum work order for Sinking of 03 (Three) nos. river bed tube wells including collecting main, sluice valve chamber, reinforcement & other allied works at Bagdiha H/W site at Ajoy river under Augmentation of Bagdiha Water Supply Scheme under RCFA Division-I PHE Dte. ORD/000205/2023-2024 2240/RCD-I 17/07/2023 30 M/S KALYANI ENTERPRISE 24.44 0.00 0
336 RCFA Division -I Acceptance cum work order Construction of Boundary wall including land development, approach road (Length-65 mtr) and drain (Length-160 mtr) at Sarisathali OHR site of Augmentation of Sarsathali Piped Water Supply Scheme under Barabani Block under RCFA Division-I PHE Dte. ORD/000206/2023-2024 2219/RCD-I 17/07/2023 30 M/S CHANDI CHARAN ROY 29.79 18.72 65
337 RCFA Division -I Supply of Computer and accessories for Office use under RCFA Division-I PHE Dte. District - Paschim Bardhaman (Sl No. 01) ORD/000207/2022-2023 1908/RCD-I 12/08/2022 7 SHARMA ENGINEERING WORKS 1.30 1.30 0
338 RCFA Division -I Supply of 10 mm into female 15 mm outer male reducer Brass Bush at Searsole Store to provide interconnection work in between maniflod and ferrule under Ukhra Water Supply Scheme under RCFA Division-I PHE Dte. (Sl No. 02) ORD/000208/2022-2023 1909/RCD-I 12/08/2022 7 SNEHA ELECTRIC 4.69 4.69 0
339 RCFA Division -I Acceptance cum work order for construction work and Interior Decoration of Office Building in Asansol under Augmentation of RCFA Part II Piped Water Supply Scheme Volume-II under RCFA Division-I PHE Dte. ORD/000209/2024-2025 2513/RCD-I 04/10/2024 45 M/S KALYANI ENTERPRISE 41.78 5.37 100
340 RCFA Division -I Emergency for providing balance FHTC through retrofitting at Shamdi G.P. area and Chayanpur and adjacent villages under Chotkara Kanskuli W/S Scheme under RCFA Division-I PHE Dte.(Sl no 03) ORD/000211/2022-2023 1980/RCD I 24/08/2022 15 KHEPI MAA TRADERS 4.54 4.04 0
341 RCFA Division -I Providing FHTC through Retrofitting at Salanpur Mouza, Vill-Salanpur, Block-Salanpur of Salanpur Water Supply Scheme under RCFA Division-I PHE Dte. ORD/000215/2020-2021 432 /RCD-I 04/03/2021 45 GITA CONSTRUCTION 46.13 75.61 0
342 RCFA Division -I Acceptance cum work order for Balance work of OHR and Construction of new boundary wall, Land developing and Path way and other allied works at Saora mouza, Plot No:2787 at R.C.C over Head Site of Augmentation of Amritnagar Zone-II Piped Water Supply Scheme within RCFA Part-II Area under Raniganj Block under RCFA Division-I, PHE Dte. ORD/000215/2024-2025 2550/RCD-I 29/10/2024 154 DAS & CHAKRABORTY 26.19 13.58 80
343 RCFA Division -I Acceptance cum work order Additional work for Distribution Network including adopting trench less technology at two places under Augmentation of Jamgram Water Supply Scheme under RCFA Division-I PHE Dte. ORD/000216/2023-2024 2223/RCD-I 17/07/2023 30 B.T.M CONCERN 39.15 35.84 92
344 RCFA Division -I Acceptance cum work order for Balance work in connection with Improvement of RCFA Part-I Water Supply Scheme within command area of Zone-V under RCFA Division-I PHE Dte. ORD/000217/2023-2024 2211/RCD-I 17/07/2023 30 MACHINO TECHNO 19.71 11.22 60
345 RCFA Division -I Acceptance cum work order for Allied work of Replacement of A.C pipe of Main Distribution pipeline from Madhaiganj OHR to RANGAMATI Village including ROAD Restoration of Rangamati Village Of Augmentation of RCFA part III Zone I under RCFA Div- I, PHE Dte. ORD/000217/2024-2025 2547/RCD-I 29/10/2024 154 BASANTI TRADERS 32.79 4.65 40
346 RCFA Division -I Acceptance cum work order for Additional work for laying of pipe line (Left Out) with HDPE pipe with FHTC at Seterbundhu, Kanksa Colony & Subhaspally within command area of Kanksa Zone-II/C PWSS with reconnection of existing FHTC and other allied works of Augmentation of Napara PWSS under RCFA Division-I PHE Dte. ORD/000219/2025-2026 1441/RCD-I 15/05/2025 45 MAK CONSTRUCTION CO 27.33 0.00 100
347 RCFA Division -I Acceptance cum work order Laying & Pushing of 600 mm dia RCC (NP3) Hume Pipe by adopting trench less technology (e.g. Jack Pushing Method etc) at 01 (One) location on Salanpur ¿ Khuidica road and supplying and laying MS pipe near culvert and gas line including ancillary work within command area of Zone-I (Dendua OHR Site) Part-C under Improvement of RCFA Part-I PWSS under RCFA Division-I PHE Dte. ORD/000220/2023-2024 2225/RCD-I 17/07/2023 259 DAS & CHAKRABORTY 15.47 12.05 100
348 RCFA Division -I Acceptance cum work order Laying & Pushing of 600 mm dia RCC (NP3) Hume Pipe by adopting trench less technology (e.g. Jack Pushing Method etc) at Bhtas more, ardanga more on Asansol Runakuraghat Road, including supply of MS pipe and left out laying of HDPE pipe at Gourandi Bazar and allied works under Augmentation of Panuria PWSS under RCFA Division-I PHE Dte. ORD/000224/2023-2024 2227/RCD-I 17/07/2023 30 GITA CONSTRUCTION 43.42 39.50 91
349 RCFA Division -I Acceptance cum work order for Laying of Rising main and other allied works from Panshuili H/W Site to Natundanga OHR of Augmentation of RCFA (PART-lll) Zone-l Piped water supply scheme (Complying JJM) under RCFA Division-I PHE Dte. ORD/000224/2024-2025 2556/RCD-I 29/10/2024 180 UNITED CONSTRUCTION 36.87 2.57 70
350 RCFA Division -I Acceptance cum work order Laying & Pushing of 600 mm dia RCC (NP3) Hume Pipe by adopting trench less technology (e.g. Jack Pushing Method etc) at Amnala more to towards Amnala village surrounding area (Zone-IX) under Improvement of RCFA Part-I (Zone-11) PWSS under RCFA Division-I PHE Dte. ORD/000226/2023-2024 2228/RCD-I 17/07/2023 30 KHEPI MAA TRADERS 13.09 13.09 100
351 RCFA Division -I Acceptance cum work order for Additional work laying of 180 mm dia HDPE pipe line at Alladi More to Jemnari Bus Stand and Railway crossing at Rupnarayanpur village in connection with Improvement of RCFA Part-I Water Supply Scheme within command area of (Zone-V) with LDS & FHTC work under RCFA Division-I PHE Dte. ORD/000227/2023-2024 2212/RCD-I 17/07/2023 30 MACHINO TECHNO 54.74 10.58 100
352 RCFA Division -I Acceptance cum work order for Additional for Distribution Network for Augmentation of Ondal (Phase-II/A) Piped Water Supply Scheme (Part-2) Block Andal, Dist-Paschim Bardhaman under RCFA Div-I PHE Dte. ORD/000228/2023-2024 2213/RCD-I 17/07/2023 30 SOMNATH SAMANTA 11.57 6.78 100
353 RCFA Division -I Acceptance cum work order for Additional works of Dismantling & concrete works & extra cutting Laterate/sandstone at distribution network for Improvement RCFA Part-I Water Supply Scheme within command area of Zone-VIII under RCFA Division-I PHE Dte. ORD/000229/2023-2024 2248/RCD-1 17/07/2023 30 SWATI CORPORATION 12.73 9.93 80
354 RCFA Division -I Acceptance cum work order for Additional for Distribution Network for Augmentation of Ondal (Phase-II/A) Piped Water Supply Scheme (Part-3) Block Andal, Dist-Paschim Bardhaman under RCFA Div-I PHE Dte. ORD/000230/2023-2024 2214/RCD-I 17/07/2023 30 UNITED CONSTRUCTION 56.60 284.34 50
355 RCFA Division -I Acceptance cum work order Laying & Pushing of 600 mm dia RCC (NP3) Hume Pipe by adopting trench less technology (e.g. Jack Pushing Method etc) at 04 nos location (Bus stand/Taxi stand Domohani Bazar, Rural more, Near Domohani Electric Supply Office, BDO Office More) of Barabani Block under Improvement of RCFA Part-I (Zone-11, Part-6) PWSS under RCFA Division-I PHE Dte. ORD/000231/2023-2024 2229/RCD-I 17/07/2023 30 UMA ENTERPRISE 30.82 0.00 0
356 RCFA Division -I Acceptance cum work order for Additional for Distribution Network for Augmentation of Ondal (Phase-I) Piped Water Supply Scheme (Part-C) Block Andal, Dist-Paschim Bardhaman under RCFA Division-I PHE Dte. ORD/000233/2023-2024 2215/RCD-I 17/07/2023 30 M/S UNIT CONSTRUCTION 30.80 30.73 100
357 RCFA Division -I Acceptance cum work order Laying & Pushing of 600 mm dia RCC (NP3) Hume Pipe by adopting trench less technology (e.g. Jack Pushing Method etc) at 3 (Three) nos. location at Lalganj Domohani Road under Improvement of RCFA Part-I (Zone-11) PWSS under RCFA Division-I PHE Dte. ORD/000234/2023-2024 2230/RCD-I 17/07/2023 30 R B ENTERPRISE 42.66 26.20 65
358 RCFA Division -I Acceptance cum work order for Additional works for distribution main pipe line including Road Restoration under Augmentation of Jatgoria Water Supply Scheme Distribution System of Jatgoria W/S Scheme under RCFA Division-I PHE Dte. ORD/000235/2024-2025 2607/RCD-I 12/11/2024 90 SUPERSKILL 84.46 0.00 0
359 RCFA Division -I Acceptance cum work order Laying & Pushing of 600 mm dia RCC (NP3) Hume Pipe by adopting trench less technology (e.g. Jack Pushing Method etc) at Charanpur Bus Stand and Faridpur of Barabani Block under Improvement of RCFA Part-I (Zone-11, Part-9) PWSS under RCFA Division-I PHE Dte. ORD/000238/2023-2024 2231/RCD-I 17/07/2023 30 SOMNATH SAMANTA 14.44 14.39 100
360 RCFA Division -I Acceptance cum work order for Left out part at Banbahal village distribution pipe line Zone-4A under Pandabeswar Block for smooth running of water supply near Shankarpur area of Augmentation PWSS of RCFA Part-II (Zone-2A) under RCFA Division-I PHE Dte. ORD/000238/2025-2026 1460/RCD-I 15/05/2025 30 BABA LOKNATH ENTERPRISE 18.07 0.00 80
361 RCFA Division -I Acceptance cum work order for Providing FHTC work at Baradanga, Alipur and Kanta Pahari Villages under Augmentation of Panuria Water Supply Scheme under RCFA Division-I PHE Dte. ORD/000240/2022-2023 2015/RCD-I 26/08/2022 45 GITA CONSTRUCTION 44.01 24.63 40
362 RCFA Division -I Acceptance cum work order for Laying & Pushing of 600 mm dia RCC (NP3) Hume Pipe by adopting trench less technology (e.g. Jack Pushing Method etc) at 03 (Three) nos. location at Lalganj Domohani Road, Kelejhora Health Centre More to Puchra Road, Puchra to Natudihi Road under Augmentation of Jamuria (Rural) (Zone-I) PWSS under RCFA Division-I PHE Dte. ORD/000240/2023-2024 2217/RCD-I 17/07/2023 30 VISUVIOUS 30.35 30.36 100
363 RCFA Division -I Acceptance cum work order for Distribution System surrounding OHR near Panuria under Agumentation of Panuria PWSS under RCFA Division-I PHE Dte. ORD/000242/2022-2023 2151/RCD-I 02/09/2022 30 A. CONSTRUCTION CO. 28.88 26.24 100
364 RCFA Division -I Acceptance cum work order Laying & Pushing of 600 mm dia RCC (NP3) Hume Pipe by adopting trench less technology (e.g. Jack Pushing Method etc) at Kelejhora Health Centre More under Improvement of RCFA Part-I (Zone-11) PWSS under RCFA Division-I PHE Dte. ORD/000242/2023-2024 2233/RCD-I 17/07/2023 30 SNEHA ELECTRIC 29.11 16.38 55
365 RCFA Division -I Acceptance cum work order for Distribution Network for Augmentation of Ondal (Phase ¿ II/A) Piped Water Supply Scheme including FHTC & allied work within Ondal Block under RCFA Division-I PHE Dte. (Part - 3) ORD/000245/2022-2023 2211/RCD-I 14/09/2022 45 UNITED CONSTRUCTION 88.03 74.93 90
366 RCFA Division -I Acceptance cum work order for Providing FHTC through Retrofitting at Maira area Dakshin Khnada (Jl No. 36) Block ¿ Andal of RCFA Part-II W/S Scheme under RCFA Division-I PHE Dte. ORD/000246/2022-2023 2212/RCD-I 14/09/2022 30 UNITED CONSTRUCTION 44.65 9.74 0
367 RCFA Division -I Acceptance cum work order for Additional work of Supplying, laying and aligning of HDPE distribution pipe line / rising main & allied works at Bistupur Head Works Site and Saraswatingunj command area of Bistupr PWSS under RCFA Division-I PHE Dte. ORD/000246/2025-2026 1468/RCD-I 15/05/2025 170 MRITYUNJOY MUKHERJEE & CO. 79.35 0.00 70
368 RCFA Division -I Acceptance cum work order Repair and renovation works of One no RCC Elevated Reservoir of Capacity 1362 cum at Khandra for Augmentation RCFA Part-II (Zone-9B) Piped Water Supply Scheme under RCFA Division-I PHE Dte. ORD/000247/2023-2024 2234/RCD-I 17/07/2023 30 UNITED CONSTRUCTION 16.43 16.29 100
369 RCFA Division -I Preparation of DPR & Route Survey for Augmentation of Jamuria (Rural) (Zone-II) Piped Water Supply Scheme Block-Jamuria, Dist-Paschim Bardhaman under RCFA Division-I PHE Dte. (Sl No. 13) ORD/000250/2022-2023 2230/RCD I 15/09/2022 15 APEX ENGINEERING 3.58 3.58 0
370 RCFA Division -I Acceptance cum work order Balance work in connection with Improvement of RCFA Part-I Water Supply Scheme within command area of Zone-V with LDS & FHTC work under RCFA Division-I PHE Dte. ORD/000250/2023-2024 2239/RCD-I 17/07/2023 259 MRITYUNJOY MUKHERJEE & CO. 88.68 0.00 100
371 RCFA Division -I Preparation of DPR & Route Survey for augumentation of Jamuria (Rural) (Zone-I) piped water supply scheme block-Jamuria, dist- Paschim Barddhaman under RCFA Division-I PHE Dte. (Sl No. 32) ORD/000251/2022-2023 2247/RCD I 15/09/2022 15 APEX ENGINEERING 3.43 3.43 0
372 RCFA Division -I Acceptance cum work order for Additional 1 no sinking of 300 x 200 mm dia& distribution pipe line with interconnection for GopalpurNamoparaAdibasipara at ChatallidangaGosaidanga, Dangapara, Dhoadanga for Augmentation of Ground Water Based Water Supply Scheme for Bistupur under RCFA Division-I PHE Dte. ORD/000256/2025-2026 1478/RCD-I 15/05/2025 60 RANJIB GHATAK 73.79 0.00 0
373 RCFA Division -I Acceptance cum work order for Providing FHTC through Retrofitting at Subhas Para & Chunari Para (Sansad-III) Block-Andal & Pandabeswar of Ukhra Water Supply Scheme under RCFA Division-I PHE Dte. ORD/000258/2021-2022 1867/RCD-I 28/10/2021 30 DAS & CHAKRABORTY 18.10 18.09 0
374 RCFA Division -I Acceptance cum work order for Providing FHTC through Retrofitting at Hanuman Danga & Saradapally (Sansad-IV) Block-Andal & Pandabeswar of Ukhra Water Supply Scheme under RCFA Division-I PHE Dte. ORD/000259/2021-2022 1868/RCD-I 28/10/2021 30 DAWN CONSTRUCTION 26.54 26.54 0
375 RCFA Division -I Acceptance cum work order for Providing FHTC through Retrofitting at Ukhra Bazar Area (Sansad-V) Block-Andal & Pandabeswar of Ukhra Water Supply Scheme under RCFA Division-I PHE Dte. ORD/000260/2021-2022 1869/RCD-I 28/10/2021 30 UMA ENTERPRISE 21.30 21.30 0
376 RCFA Division -I Acceptance cum work order for Providing FHTC through Retrofitting at Suri Para, Bisakhalakhi Tala (Sansad-VI) Block-Andal & Pandabeswar of Ukhra Water Supply Scheme under RCFA Division-I PHE Dte. ORD/000261/2021-2022 1870/RCD-I 28/10/2021 30 JAYANTA DATTA 18.06 18.06 0
377 RCFA Division -I Acceptance cum work order for Providing FHTC through Retrofitting at Puratan Mushlim Para & Dhibarpara (Sansad-VII) Block-Andal & Pandabeswar of Ukhra Water Supply Scheme under RCFA Division-I PHE Dte. ORD/000262/2021-2022 1871/RCD-I 28/10/2021 30 RUBY CONSTRUCTION 15.67 15.67 0
378 RCFA Division -I Acceptance cum work order for Providing FHTC through Retrofitting at Kankardanga (Sansad-VIII) Block-Andal & Pandabeswar of Ukhra Water Supply Scheme under RCFA Division-I PHE Dte. ORD/000263/2021-2022 1872/RCD-I 28/10/2021 30 MS KALYAN ENTERPRISE 10.60 10.60 0
379 RCFA Division -I Acceptance cum work order for HDPE distribution pipe line laying for Gourbazar and Bhabanandapur village and other allied works under Augmentation of RCFA Part-III (Zone-I) PWSS under RCFA Davison-I PHE Dte. ORD/000263/2025-2026 1485/RCD-I 15/05/2025 120 SILPO UDYOG ENGINEERING CONSTRUCTIONS 34.41 0.00 80
380 RCFA Division -I Acceptance cum work order for Providing FHTC through Retrofitting at Dangal Para (Sansad-XI) Block-Andal & Pandabeswar of Ukhra Water Supply Scheme under RCFA Division-I PHE Dte. ORD/000264/2021-2022 1873/RCD-I 28/10/2021 30 SNEHA ELECTRIC 13.31 13.30 0
381 RCFA Division -I Acceptance cum work order for Providing FHTC through Retrofitting at Mulimpara & Ruidaspara (Sansad-XIII) Block-Andal & Pandabeswar of Ukhra Water Supply Scheme under RCFA Division-I PHE Dte. ORD/000265/2021-2022 1874/RCD-I 28/10/2021 30 MD. JAWED KHAN 18.16 18.15 0
382 RCFA Division -I Acceptance cum work order for Providing FHTC through Retrofitting at Asthalpara (Sansad-XIV) Block-Andal & Pandabeswar of Ukhra Water Supply Scheme under RCFA Division-I PHE Dte. ORD/000266/2021-2022 1875/RCD-I 28/10/2021 30 UNITED CONSTRUCTION 13.32 13.32 0
383 RCFA Division -I Acceptance cum work order for Additional work of supplying laying and aligning of HDPE distribution pipe line & allied works including Function House Hold Tap Connection (FHTC) and re concoction at Ghatakdanga, Akandara and Saraswatigunj under command area of Bistupur under Augmentation of Bistupur PWSS under RCFA Division-I PHE Dte. ORD/000266/2025-2026 1488/RCD-I 15/05/2025 170 MACHINO TECHNO 44.86 0.00 50
384 RCFA Division -I Acceptance cum work order for Providing FHTC through Retrofitting at Pathakpara (Sansad-XV) Block-Andal & Pandabeswar of Ukhra Water Supply Scheme under RCFA Division-I PHE Dte. ORD/000267/2021-2022 1876/RCD-I 28/10/2021 30 B.T.M CONCERN 15.25 15.25 0
385 RCFA Division -I Acceptance cum work order for Repairing of Boundary wall, dismantling & reconstruction of flooring of Pump House, CWR and other allied work at H/W site of Ballavpur Hospital under RCFA Part-II W/S Scheme under RCFA Division-I PHE Dte. (Sl No. 02) ORD/000267/2023-2024 2324/RCD-I 01/08/2023 21 SUBHADEEP DAS 7.46 7.40 100
386 RCFA Division -I Acceptance cum work order for Providing FHTC through Retrofitting at Mukherjeepara & Khad Para (Sansad-XVII) Block-Andal & Pandabeswar of Ukhra Water Supply Scheme under RCFA Division-I PHE Dte. ORD/000268/2021-2022 1877/RCD-I 28/10/2021 30 SIMA ENTERPRISE 15.72 15.71 0
387 RCFA Division -I Acceptance cum work order for Providing FHTC through Retrofitting at Teli Para (Sansad-XVIII) Block-Andal & Pandabeswar of Ukhra Water Supply Scheme under RCFA Division-I PHE Dte. ORD/000269/2021-2022 1878/RCD-I 28/10/2021 30 M/S K & KONAR CONSTRUCTION 17.13 17.12 0
388 RCFA Division -I Acceptance cum work order for Providing FHTC through Retrofitting at Sukho Para (Sansad-XX) Block-Andal & Pandabeswar of Ukhra Water Supply Scheme under RCFA Division-I PHE Dte. ORD/000270/2021-2022 1879/RCD-I 28/10/2021 30 SOMNATH SAMANTA 15.63 15.63 0
389 RCFA Division -I Acceptance cum work order for Providing FHTC through Retrofitting at Guzarbagh (Sansad-XXI) Block-Andal & Pandabeswar of Ukhra Water Supply Scheme under RCFA Division-I PHE Dte. ORD/000271/2021-2022 1880/RCD-I 28/10/2021 30 R B ENTERPRISE 13.30 13.30 0
390 RCFA Division -I Acceptance cum work order for Providing FHTC through Retrofitting at Safique Nagar (Sansad-XXII) Block-Andal & Pandabeswar of Ukhra Water Supply Scheme under RCFA Division-I PHE Dte. ORD/000272/2021-2022 1881/RCD-I 28/10/2021 30 A. CONSTRUCTION CO. 18.11 18.11 0
391 RCFA Division -I Acceptance cum work order for Construction of Boundary Wall with gate (length 200 mtr.) land development with approach road including internal drain at H/W site & construction of guard room with toilet at Baliapur under Barabani Block in Improvement of RCFA Part-I W/S Scheme under RCFA Division-I PHE Dte. ORD/000273/2023-2024 2330/RCD-I 01/08/2023 90 AMAR CONSTRUCTION 31.48 30.67 100
392 RCFA Division -I Sinking of 3 (Three) nos 200 mm dia River Bed Tube Wells including repairing work of 100 mm dia Collecting Mains which were damaged due to flood in the month of July - August & etc. allied works at River Damodar under Ratibati Water Supply Scheme under RCFA Div-I PHE Dte. (sl no 05) ORD/000278/2021-2022 1937/RCD I 09/11/2021 20 M/S PIONEER CONSTRUCTION 3.17 2.92 0
393 RCFA Division -I Preparation of DPR & Route Survey for augumentation of Bagdiha piped water supply scheme block-Jamuria, dist- Paschim Barddhaman under RCFA Division-I PHE Dte. ORD/000279/2022-2023 2246/RCD I 15/09/2022 15 APEX ENGINEERING 3.43 3.43 0
394 RCFA Division -I Acceptance cum work order for Additional Providing FHTC of retrofitting at Kumardiha village (left out portion) of Kumardiha Mouza, Retrofitting of Madantore PWSS for providing FHTC under RCFA Division-I PHE Dte. ORD/000281/2024-2025 2619/RCD-I 14/11/2024 20 D.S.C. CONCERN 6.57 0.00 0
395 RCFA Division -I Acceptance cum work order for Laying & Pushing of 800 mm dia RCC (NP3) Hume pipe by adopting trench less technology (e.g. Jack Pushing Method etc.) at Amdiha more towards Itapara village Surrounding area (Zone-IX) under Improvement of RCFA Part-I PWSS under RCFA Division-I PHE Dte. ORD/000283/2023-2024 2332/RCD-I 01/08/2023 15 SRI KRISHNA ENTERPRISE 19.97 18.86 100
396 RCFA Division -I Acceptance cum work order for Laying & Pushing by adopting trench less technology (e.g. Jack Pushing Method etc) and allied works at Bagdiha to Sidhapur Road and Bagdiha OHR to Bahadurpur under Jamuria Block under Augmentation of Bagdiha PWSS under RCFA Division-I PHE Dte. ORD/000284/2023-2024 2333/RCD-I 01/08/2023 15 SIMA ENTERPRISE 46.60 36.04 77
397 RCFA Division -I Acceptance cum work order for Laying & Pushing of 600 mm dia RCC (NP3) Hume pipe by adopting trench less technology at 4 nos location (Dabor more, Achhra Road, Rupnarayanpur Phari, Rupnarayanpur Chittaranjan Road) of Salanpur Block under Improvement of RCFA Part-I (Zone-7, Part-F) PWSS under RCFA Division-I PHE Dte. ORD/000289/2023-2024 2338/RCD-I 01/08/2023 15 GITA CONSTRUCTION 67.97 63.53 100
398 RCFA Division -I Acceptance cum work order for Laying rising main including Guard room with Toilet including 12 (Twelve) nos Tube Well and Collecting main at River Ajoy under due to open cast mining activity of ECL Salanpur area for Sarisatali and Majiara Water Supply Scheme under RCFA Division-I PHE Dte. ORD/000290/2023-2024 2339/RCD-I 01/08/2023 90 MRITYUNJOY MUKHERJEE & CO. 87.93 13.26 20
399 RCFA Division -I Construction of 450 cum capacity 20 Mtr staging height RCC Over Head Reservoir (Pipe connection and cost of pipes, specials at Barabani (Zone-XIII) for Improvement of RCFA Part-I Piped Water Supply Scheme under RCFA Division-I PHE Dte. in the District of Paschim Bardhaman [Rf Drwaing no. PC-I/OHR/04/2012(Sheet 1& 2) under RCFA Division-I PHE Dte. ORD/000291/2022-2023 2448/RCD-I 13/10/2022 365 JOY HIND TUBEWELLS 122.44 122.44 0
400 RCFA Division -I Acceptance cum work order for Additional pipe line with of HDPE pipe with at Pratappur and Kalikapur with re-connection of existing FHTC and other allied works of Augmentation of RCFA (PART-lll) Zone-l Piped water supply scheme (Complying JJM) under RCFA Division-I PHE Dte. ORD/000291/2024-2025 2628/RCD-I 14/11/2024 182 SIMA ENTERPRISE 57.50 9.31 80
401 RCFA Division -I Distribution network for Augmentation of Jamuria Rural-II Piped Water Scheme including FHTC work Block Jamuria, Dist Paschim Bardhaman under RCFA Div-I PHE Dte. ORD/000292/2022-2023 2449/RCD-I 13/10/2022 180 JOY HIND TUBEWELLS 236.71 59.28 100
402 RCFA Division -I Acceptance cum work order for Urgent basis repairing work of Churulia OHR of capacity 100000 gallons and 20 mtr staging height under Churulia Water Supply Scheme under RCFA Division-I PHE Dte. ORD/000293/2021-2022 2025/RCD-I 24/11/2021 30 ASHA CONSTRUCTION 15.47 15.33 0
403 RCFA Division -I Laying of distribution system including FHTC work for Augmentation of Madantore Piped Water Supply Scheme under RCFA Division-I PHE Dte. ORD/000293/2022-2023 2450/RCD-I 13/10/2022 180 JOY HIND TUBEWELLS 246.41 241.34 100
404 RCFA Division -I Acceptance cum work order for Construction of Separate Zone at Rakshitpur with Boundary wall, Pump House, Tubewell & other allied works of Augmentation of Bistupur PWSS under RCFA Division-I PHE Dte. ORD/000293/2024-2025 2627/RCD-I 14/11/2024 352 MACHINO TECHNO 70.46 0.00 20
405 RCFA Division -I Acceptance cum work order for Supplying, laying and aligning distribution branch main from distribution main including providing FHTC work at Bilpahari Bauri Para (Re-habilitated village) under Kendra Khottamdihi Water Supply Scheme under RCFA Division-I PHE Dte. ORD/000294/2021-2022 2026/RCD-I 24/11/2021 30 RANJIB GHATAK 26.95 22.70 0
406 RCFA Division -I Distribution Network for Improvement of RCFA Part-II Water Supply Scheme Under RCFA Division-I PHE Dte. ORD/000294/2022-2023 2451/RCD-I 13/10/2022 180 SINGHA ROY & CO. 270.57 130.13 0
407 RCFA Division -I Acceptance cum work order for Additional work for distribution network including supply of Hume pipe, G.I. pipe and adopting trench less technologies at 02 (Two) locations in connection to Zone-I Part-A Dendua OHR for Improvement of RCFA Part-I Water Supply Scheme under RCFA Division-I PHE Dte. ORD/000294/2023-2024 2365/RCD-I 04/08/2023 30 ASHA CONSTRUCTION 15.08 14.43 100
408 RCFA Division -I Acceptance cum work order for Supplying, laying and aligning distribution branch main from distribution main including providing FHTC work at Bilpahari General Para (Re-habilitated village) under Kendra Khottamdihi Water Supply Scheme under RCFA Division-I PHE Dte. ORD/000295/2021-2022 2027/RCD-I 24/11/2021 30 SWATI CORPORATION 39.08 31.16 0
409 RCFA Division -I Acceptance cum work order Providing FHTC work at Panuria (Part) and adjacent Habitation under Augmentation of Panuria Water Supply Scheme under RCFA Div-I, PHE Dte. ORD/000295/2022-2023 2468/RCDI 14/10/2022 45 A. CONSTRUCTION CO. 69.99 65.36 100
410 RCFA Division -I Acceptance cum work order for Additional work for the laying of DI pipe, MS work, making valve chamber and other allied works for Improvement RCFA Part-I Water Supply Scheme within command area of Zone-XI (Part-2 Distribution Segment) under RCFA Division-I PHE Dte. ORD/000295/2023-2024 2366/RCD-I 04/08/2023 30 SNEHA ELECTRIC 51.75 50.20 98
411 RCFA Division -I Acceptance cum work order for Construction of Separate Zone at Sukna with Boundary wall, Pump House & other allied works of Augmentation of ground water based water supply scheme for Napara under RCFA Division-I PHE Dte. ORD/000295/2024-2025 2625/RCD-I 14/11/2024 137 UNITED CONSTRUCTION 27.73 9.41 60
412 RCFA Division -I Acceptance cum work order of distribution network for augmentation of Ondal (Phase II/A) piped water supply scheme including FHTC & allied work within Ondal Block under RCFA Div-I, PHE Dte. (Part-I) ORD/000296/2022-2023 2482/RCD I 17/10/2022 45 SIMA ENTERPRISE 89.81 71.28 90
413 RCFA Division -I Acceptance cum work order Additional work for the laying of Distribution Network for Improvement RCFA Part-I Water Supply Scheme within command area of Zone-XI (Part-1 Distribution Segment) under RCFA Division-I PHE Dte. ORD/000296/2023-2024 2367/RCD-I 04/08/2023 30 R B ENTERPRISE 47.39 40.66 86
414 RCFA Division -I Acceptance cum work order for Creating separate zone with pipe & additional FHTC including Water sources at Chua Adhibasipara under Augmentation of Bistupur Water Supply Scheme under RCFA Division-I PHE Dte. ORD/000296/2024-2025 2639/RCD-I 14/11/2024 352 MRITYUNJOY MUKHERJEE & CO. 20.41 2.35 50
415 RCFA Division -I Distribution Network for Augmentation of Ondal Phase-1 Piped Water Supply Scheme including FHTC & allied work within Ondal Block under RCFA Division-I PHE Dte. (Part-C) ORD/000297/2022-2023 2452/RCD-I 13/10/2022 180 M/S PIONEER CONSTRUCTION 307.62 304.88 100
416 RCFA Division -I Acceptance cum work order for Supply and laying of 16 sqmm x 4 core Al armored PVC power cable and 10 HP Submersible Pump at Ratibati river bed pump house site damaged due to spreading of fire of Ratibati Water Supply Scheme under RCFA Division-I PHE Dte. ORD/000298/2021-2022 2030/RCD-I 24/11/2021 10 M/S PIONEER CONSTRUCTION 11.72 11.72 0
417 RCFA Division -I Construction of 900 cum capacity 20 Mtr staging height RCC Over Head Reservoir (Pipe connection and cost of pipes, specials at (Zone VII) for Improvement of RCFA Part-I Piped Water Supply Scheme under RCFA Division-I PHE Dte. in the District of Paschim Bardhaman (2nd Call) ORD/000298/2022-2023 2453/RCD-I 13/10/2022 365 SINGHA ROY & CO. 181.16 181.16 100
418 RCFA Division -I Acceptance cum work order for Providing FHTC through Retrofitting at Dakshin Khanda (Jl No. 36) Block ¿ Andal of RCFA Part-II W/S Scheme under RCFA Division-I PHE Dte. (Part ¿ A) ORD/000299/2021-2022 2124/RCD-I 29/11/2021 30 A.K.CONSTRUCTION 14.40 14.40 0
419 RCFA Division -I Acceptance cum work order of distribution network for augmentation Of Ondal (Phase-II/A) piped Water Supply scheme including FHTC & allied works Ondal Block under RCFA Div-I PHE Dte.(Part-2) ORD/000299/2022-2023 2483/RCD I 17/10/2022 45 SOMNATH SAMANTA 89.80 65.01 90
420 RCFA Division -I Acceptance cum work order for Providing FHTC through Retrofitting at Dakshin Khanda (Jl No. 36) Block ¿ Andal of RCFA Part-II W/S Scheme under RCFA Division-I PHE Dte. (Part ¿ B) ORD/000300/2021-2022 2125/RCD-I 29/11/2021 30 UNITED CONSTRUCTION 14.36 14.36 0
421 RCFA Division -I Acceptance cum work order for Providing FHTC through Retrofitting at Dakshin Khanda (Jl No. 36) Block ¿ Andal of RCFA Part-II W/S Scheme under RCFA Division-I PHE Dte. (Part ¿ C) ORD/000301/2021-2022 2126/RCD-I 29/11/2021 30 DURGADAS MONDAL 14.37 14.26 0
422 RCFA Division -I Laying of Distribution System to Accommodate FHTC and Providing FHTC including supplying, laying, fitting, fixing of 15mm NB PVC (schedule 80)/20mm OD HDPE (PE100, PN6) pipe with all necessary specials, saddle piece etc. all complete for Augmentation of Sub-Surface Water Based Piped Water Supply Scheme for Amritnagar Zone-II under RCFA Division I, PHE Dte.under RCFA Division I, PHE Dte. ORD/000301/2022-2023 2455/RCD-I 13/10/2022 536 MACHINO TECHNO 366.55 235.84 100
423 RCFA Division -I Acceptance cum work order for Providing FHTC through Retrofitting at Dakshin Khanda (Jl No. 36) Block ¿ Andal of RCFA Part-II W/S Scheme under RCFA Division-I PHE Dte. (Part ¿ D) ORD/000302/2021-2022 2127/RCD-I 29/11/2021 30 SIMA ENTERPRISE 14.42 14.42 0
424 RCFA Division -I Acceptance cum work order of Construction of CWR (Clear Water Reservoir) of Capacity 500 cum and allied work at Dendua under Improvement of RCFA Part-I Water Supply Scheme under RCFA Division-I PHE Dte. ORD/000302/2022-2023 2484/RCD I 18/10/2022 120 D.S. ENTERPRISE 61.78 43.72 96
425 RCFA Division -I Acceptance cum work for Providing FHTC through Retrofitting at Dakshin Khanda (Jl No. 36) Block ¿ Andal of RCFA Part-II W/S Scheme under RCFA Division-I PHE Dte. (Part ¿ E) ORD/000303/2021-2022 2128/RCD-I 29/11/2021 30 M/S KALYANI ENTERPRISE 14.45 14.44 0
426 RCFA Division -I Acceptance cum work order of rising main for Amritnagar Zone-II Water Supply Scheme for Ranoganj Block under RCFA Div-I, PHE Dte. ORD/000303/2022-2023 2513/RCD I 20/10/2022 30 MD. JAWED KHAN 38.50 38.44 100
427 RCFA Division -I Acceptance cum work order for Providing FHTC through Retrofitting at Dakshin Khanda (Jl No. 36) Block ¿ Andal of RCFA Part-II W/S Scheme under RCFA Division-I PHE Dte. (Part ¿ F) ORD/000304/2021-2022 2129/RCD-I 29/11/2021 30 M/S SUBHRADEEP 16.51 16.51 0
428 RCFA Division -I Acceptance cum work order for Providing FHTC through Retrofitting at Khandra CT (Jl No. 32) Block ¿ Andal of RCFA Part-II W/S Scheme under RCFA Division-I PHE Dte. (Part ¿ B1) ORD/000305/2021-2022 2130/RCD-I 29/11/2021 30 D.S. ENTERPRISE 18.12 12.86 0
429 RCFA Division -I Formal Work Order for Laying of different dia HDPE pipe line and allied works at Raghunathchak, Raniganj Chati, Baliapur and adjacent area under Zone-IX for Improvement of RCFA Part-I Water Supply Scheme under RCFA Division-I PHE Dte. ORD/000305/2023-2024 2383/RCD-I 07/08/2023 90 DAWN CONSTRUCTION 105.48 90.97 100
430 RCFA Division -I Acceptance cum work order for Providing FHTC through Retrofitting at Khandra CT (Jl No. 32) Block ¿ Andal of RCFA Part-II W/S Scheme under RCFA Division-I PHE Dte. (Part ¿ B2) ORD/000306/2021-2022 2131/RCD-I 29/11/2021 30 M/S B.K. CONSTRUCTION 18.13 18.13 0
431 RCFA Division -I Acceptance cum work order for Providing FHTC through Retrofitting at Khandra CT (Jl No. 32) Block ¿ Andal of RCFA Part-II W/S Scheme under RCFA Division-I PHE Dte. (Part ¿ C1) ORD/000307/2021-2022 2132/RCD-I 29/11/2021 30 KHEPI MAA TRADERS 17.52 17.52 0
432 RCFA Division -I Acceptance cum work order for additional work cutting hard rock,boulder concrete and others work including filling earth, removal rubbish of Augmentation of Ondal Phase-I Piped Water Supply Scheme under RCFA Division-I PHE Dte. ORD/000307/2023-2024 2382/RCD-I 07/08/2023 30 M/S UNIT CONSTRUCTION 89.75 81.28 100
433 RCFA Division -I Acceptance cum work order for Providing FHTC through Retrofitting at Khandra CT (Jl No. 32) Block ¿ Pandabeswar of RCFA Part-II W/S Scheme under RCFA Division-I PHE Dte. (Part ¿ C2) ORD/000308/2021-2022 2133/RCD-I 29/11/2021 30 MRITYUNJOY MUKHERJEE & CO. 18.70 12.53 0
434 RCFA Division -I Annual Maintenance Contract (AMC) for Computers, Prnters, UPS & other related peripherals installed at office chamber of the Assistant Engineer, Junior Engineers, DPMU, IEC under of the Executive Engineer, RCFA Division-I PHE Dte. (Period from 01.07.2023 to 31.12.2023) ORD/000308/2023-2024 2039/RCD-I 30/06/2023 184 SHARMA ENGINEERING WORKS 0.90 0.90 100
435 RCFA Division -I Formal Work Order for Additional supplying laying 280 mm & 225 mm dia HDPE pipe line for Improvement of RCFA Part-I Water Supply Scheme within command area of Zone-VIII under RCFA Division-I PHE Dte. ORD/000311/2023-2024 2384/RCD-I 07/08/2023 60 SWATI CORPORATION 124.64 97.30 80
436 RCFA Division -I Acceptance cum work order for Construction of Guard Room at Jatgoria Head Works Site under Augmentation of Jatgoria Water Supply Distribution System of Jatgoria W/S Scheme under RCFA Division-I PHE Dte. ORD/000314/2024-2025 2730/RCD-I 26/11/2024 90 IMPULSE INTERNATIONAL 5.53 0.00 40
437 RCFA Division -I Formal work order for Providing FHTC through Retrofitting at Bahula (CT) (JL no. 30, Block - Pandabeswar) of RCFA Pt-II W/S Scheme under RCFA Division-I, PHE Dte. (Part-A) ORD/000316/2021-2022 2143/RCD-I 29/11/2021 120 GITA CONSTRUCTION 81.14 61.82 0
438 RCFA Division -I Formal work order for Providing FHTC through Retrofitting at Bahula (CT) (JL no. 30, Block - Pandabeswar) of RCFA Pt-II W/S Scheme under RCFA Division-I, PHE Dte. (Part-B) ORD/000317/2021-2022 2144/RCD-I 29/11/2021 120 MD AAMIR KHAN 81.00 59.89 0
439 RCFA Division -I Formal work order for Providing FHTC through Retrofitting at Khandra (CT) (JL no. 32, Block - Andal) of RCFA Pt-II W/S Scheme under RCFA Division-I, PHE Dte. (Part-A) ORD/000318/2021-2022 2145/RCD-I 29/11/2021 488 DAS & CHAKRABORTY 78.91 68.92 100
440 RCFA Division -I Acceptance cum work order for Balance work of laying distribution system, rising main, construction of 250 cum reservoir with 20 mtr staging height including soil investigation, construction of pump house (5.40 m x 3.60 m) with sanitary & W/S arrangement & construction of pump house (3.60 m x 3.00 m) for Amlajora W/S Scheme under RCFA Division-I PHE Dte. ORD/000320/2025-2026 1424/RCD-I 15/05/2025 90 RANADHIR SINHA 59.19 0.00 70
441 RCFA Division -I Supplying, fitting, fixing and fabrication of sign board including printing and carriage to different area with necessary allied works in connection with Improvement of RCFA Part-I Piped Water Supply Scheme under RCFA Division-I PHE Dte. ORD/000321/2023-2024 Camp-02-Sign-Board-AE-II 30/06/2023 20 UNITED CONSTRUCTION 17.51 15.83 70
442 RCFA Division -I Acceptance cum work order for Supplying laying HDPE distribution pipe line at JhanjraPurbapara at Durgapur Faridpur Block under Augmentation of RCFA Part-III Zone-II under RCFA Division-I PHE Dte. ORD/000323/2025-2026 1509/RCD-I 20/05/2025 73 DAWN CONSTRUCTION 23.41 0.00 40
443 RCFA Division -I Formal Work Order for Construction of 350 cum capacity 20 Mtr staging height RCC Over Head Reservoir (Pipe connection and cost of pipes, specials at (Zone-IX) for Improvement of RCFA Part-I Piped Water Supply Scheme under RCFA Division-I PHE Dte. in the District of Paschim Bardhaman (2nd Call) ORD/000324/2022-2023 2403/RCD-I 30/09/2022 365 MALLICK ENTERPRISE 107.64 107.64 95
444 RCFA Division -I Acceptance cum work order for Supplying laying HDPE distribution pipe line at JhanjraPaschim Para at Durgapur Faridpur Block under Augmentation of RCFA Part-III Zone-I under RCFA Division-I PHE Dte. ORD/000325/2025-2026 1511/RCD-I 20/05/2025 87 UNITED CONSTRUCTION 22.25 0.00 60
445 RCFA Division -I Laying of 50 mm dia PVC pipe line and construction of different dia valve chamber, FHTC work and etc. allied works at Kendra area under RCFA Division-I PHE Dte. (Sl No. 03) ORD/000326/2021-2022 2175/RCD I 06/12/2021 10 MS KALYAN ENTERPRISE 4.57 4.47 0
446 RCFA Division -I Formal Work Order for Distribution Network for Improvement RCFA Part-I Water Supply Scheme within command area of Zone-VII under RCFA Division-I PHE Dte. (Part-F) ORD/000327/2022-2023 2404/RCD-I 30/09/2022 180 GITA CONSTRUCTION 201.57 131.66 67
447 RCFA Division -I Acceptance cum work order for Separate distribution pipe with interconnection for Gopalpur (Right Side) including Paschimpara, Bauripara, Generalparaof Gopalpur W/S Scheme for Augmentation of ground water based water supply scheme of Bistupur under RCFA Division-I PHE Dte. ORD/000329/2025-2026 1515/RCD-I 20/05/2025 73 UNITED CONSTRUCTION 38.56 0.00 80
448 RCFA Division -I Distribution network for Augmentation of Ondal (Phase-II/B) Piped Water Supply Scheme including FHTC & allied work within Ondal Block under RCFA Division-I PHE Dte. (Part-1) ORD/000331/2022-2023 2836/RCDI 28/10/2022 885 M/S KALYANI ENTERPRISE 88.58 24.33 60
449 RCFA Division -I Supply fitting fixing different dia valve and allied works in connection with laying distribution system including FHTC of Ondal Phase-I Water Supply Scheme (Part-B) under RCFA Division-I PHE Dte. ORD/000338/2023-2024 2465/RCD-I 18/08/2023 30 AMAR CONSTRUCTION 0.62 0.62 100
450 RCFA Division -I Supply of 10 mm NB Gun-metal ferrule for Providing FHTC through Retrofitting at Chapui (CT) Mouza, G.P.- Ratibati, Block- Raniganj of Ratibati Water supply scheme under RCFA Division-I, P.H.E. Dte. (Sl No 17) ORD/000339/2020-2021 363/RCD I 26/02/2021 7 SWATI CORPORATION 4.68 9.36 0
451 RCFA Division -I Acceptance cum work order for Laying and pushing by adopting trenchless technology (jack pushing method) additional for distribution network for Augmentation of RCFA part-III (Zone-II) PWSS including FHTC and allied works under RCFA Division-I, PHE Dte. ORD/000339/2024-2025 2779/RCD-I 28/11/2024 180 MAK CONSTRUCTION CO 35.16 0.00 68
452 RCFA Division -I Supply of 10 mm NB Gun-metal ferrule for Providing FHTC through Retrofitting at Chelod Mouza, G.P.- Tirat, Block- Raniganj of Ratibati Water supply scheme under RCFA Division-I, P.H.E. Dte.(SL NO 18) ORD/000341/2020-2021 364/RCD I 26/02/2021 7 MRITYUNJOY MUKHERJEE & CO. 4.66 9.33 0
453 RCFA Division -I Acceptance cum work order Construction of Boundary wall including land development, approach road (Length-65 mtr) and drain (length-160 mtr) at Jamgram OHR site of Augmentation of Jamgram Piped Water Supply Scheme under Barabani Block under RCFA Division-I PHE Dte. ORD/000346/2023-2024 2479/RCD-I 23/08/2023 30 SRI KRISHNA ENTERPRISE 36.83 0.00 5
454 RCFA Division -I Supply & erection of Swajal Village Boards (102 nos) having M.S. Channel/Angle Posts & 1.5 mm thick M.S. synthetic enamel paint over a coat of red oxied primer including lettering complete at different places under Augmentation of sub surface water based for PWSS Ondal Phase-II/B under RCFA Division-I PHE Dte. ORD/000349/2024-2025 Camp-02_Swajal/AE/24-25 03/10/2024 120 SHARMA ENGINEERING WORKS 20.55 0.00 50
455 RCFA Division -I Acceptance cum work order Sinking of 3 (Three) nos 200 mm dia river bed tube wells including collecting main in the river Ajoy at Bagdiha under Augmentation of Bagdiha Piped Water Supply Scheme under RCFA Division-I PHE Dte. ORD/000350/2023-2024 2484/RCD-I 23/08/2023 30 M/S KALYANI ENTERPRISE 24.12 0.00 0
456 RCFA Division -I Hiring of Maxi Cab (Non Air- conditioned ) bharatstage - III/BS-III purchased on after 01.05.2008 with Diesel / LPG/CNG Engine. as when required basis for supervision of FHTC related works under JJM) of RCFA Div-I, PHE Dte Govt, of West Bengal ( w.e.f 16.08.2023 to 15.02.2024) ORD/000354/2023-2024 2420/RCD-I 11/08/2023 184 PRAMIT CHATTERJEE 0.90 2.37 100
457 RCFA Division -I Supply, fitting fixing railling, grill, painting of pump house, CWR, chlorine room etc and allied works at Ratibati H/W and Tirat Colliery H/W site under RCFA Division-I PHE Dte. (Sl No. 03) ORD/000359/2021-2022 2203/RCD I 06/12/2021 21 SOMNATH SAMANTA 3.53 2.97 0
458 RCFA Division -I Acceptance cum work order for Construction of CWR (Clear Water Reservoir) of capacity 500 cum & allied work at Pansuili Head Works Site under Augmentation of Ground Water Based Water Supply Scheme for Napara W/S Scheme under RCFA Division-I PHE Dte ORD/000359/2024-2025 2851/RCD-I 04/12/2024 362 BABA LOKNATH ENTERPRISE 63.91 5.82 40
459 RCFA Division -I Acceptance cum work order for Providing FHTC through Retrofitting at Bibirbandh Para and Santipara (Sansad-I) Block-Andal & Pandabeswar of Ukhra Water Supply Scheme under RCFA Division-I PHE Dte. ORD/000365/2021-2022 2323/RCD-I 16/12/2021 30 GITASHREE FABRICATION 18.16 18.16 0
460 RCFA Division -I Acceptance cum work order for Providing FHTC through Retrofitting at Huchukpara (Sansad-II) Block-Andal & Pandabeswar of Ukhra Water Supply Scheme under RCFA Division-I PHE Dte. ORD/000366/2021-2022 2324/RCD-I 16/12/2021 30 A. CONSTRUCTION CO. 15.53 15.53 0
461 RCFA Division -I Acceptance cum work order for Providing FHTC through Retrofitting at Das Para (Sansad-XIX) Block-Andal & Pandabeswar of Ukhra Water Supply Scheme under RCFA Division-I PHE Dte. ORD/000367/2021-2022 2325/RCD-I 16/12/2021 30 JYOGOMAYA ENTERPRISE 12.46 10.43 0
462 RCFA Division -I Acceptance cum work order for Sinking of 4 (Four) nos. 200 mm dia river bed tube well in river Damodar including laying of collecting main (HDPE & MS) of Augmentation of Amritnagar Water Supply Scheme (Phase-I & II) under RCFA Division-I PHE Dte. 2nd Call ORD/000367/2022-2023 2875/RCD-I 07/11/2022 30 NIYATI CONSTRUCTION 24.50 17.68 0
463 RCFA Division -I Acceptance cum work order for Providing FHTC through Retrofitting at Chanchani (Sansad-XII) Block-Andal & Pandabeswar of Ukhra Water Supply Scheme under RCFA Division-I PHE Dte. ORD/000368/2021-2022 2326/RCD-I 16/12/2021 30 M/S B.K. CONSTRUCTION 25.70 17.19 100
464 RCFA Division -I Acceptance cum work order for Providing FHTC through Retrofitting at Chanchani (Sansad-X) Block-Andal & Pandabeswar of Ukhra Water Supply Scheme under RCFA Division-I PHE Dte. ORD/000369/2021-2022 2327/RCD-I 16/12/2021 30 ASHA CONSTRUCTION 27.72 18.23 0
465 RCFA Division -I Construction of Separate Zone at Pathardiha with Boundary wall, Pump House, Tubewell & other allied works of Augmentation of Bistupur PWSS under RCFA Division-I PHE Dte. ORD/000369/2024-2025 3097/RCD-I 13/12/2024 313 T M CONCRETE CREATION PVT.LTD 45.89 0.00 40
466 RCFA Division -I Acceptance cum work order for Providing FHTC through Retrofitting at Ukhra Area (Phase-II) Block-Andal & Pandabeswar of Ukhra Water Supply Scheme under RCFA Division-I PHE Dte. (Part-A) ORD/000370/2021-2022 2328/RCD-I 16/12/2021 30 MD AAMIR KHAN 14.42 14.42 0
467 RCFA Division -I Acceptance cum work order for Providing FHTC through Retrofitting at Ukhra Area (Phase-II) Block-Andal & Pandabeswar of Ukhra Water Supply Scheme under RCFA Division-I PHE Dte. (Part-D) ORD/000372/2021-2022 2332/RCD-I 17/12/2021 30 RELIABLE ENGINEERS CO-OP CONSTRUCTION SOCIETY LTD. 14.44 7.14 0
468 RCFA Division -I Acceptance cum work order for Providing FHTC through Retrofitting at Ukhra Area (Phase-II) Block-Andal & Pandabeswar of Ukhra Water Supply Scheme under RCFA Division-I PHE Dte. (Part-E) ORD/000373/2021-2022 2333/RCD-I 17/12/2021 30 TARAPRASAD SARKAR 14.37 12.74 100
469 RCFA Division -I Acceptance cum Work Order for Construction of Sub-Station Building at Ramnagar H/W Site within Pandabeswar Block under RCFA Part-III (Zone-I) Piped Water Supply Scheme under RCFA Division-I PHE Dte. ORD/000373/2024-2025 3101/RCD-I 13/12/2024 292 RANJIB GHATAK 36.86 0.00 90
470 RCFA Division -I Acceptance cum Work Order for Construction Boundary Wall at Bistupur H/W Site Pump House no 1 Tube well No. 1 under Augmentation of Bistupur Water Supply Scheme under RCFA Division-I PHE Dte. ORD/000376/2024-2025 3104/RCD-I 13/12/2024 60 RANA ENTERPRISE 15.43 0.00 0
471 RCFA Division -I Formal work order for Surveying, Design, Detail Engineering, Supplying and Construction, Erection, Installation, Testing, Commissioning of Fixed type Intake Jetty with raw water pump house capable of transmitting 100 MLD capacity, Raw Water Rising Main, Bank Protection, Construction of Sub Station buildings, 98 MLD (Minimum)capacity Water Treatment Plant (WTP) (out put) based on conventional technologies considering extra 20% overloading (wherever applicable) Clear Water Pumping Mains, four Booster Stations at Searsole, Shankarpur, Bansra & Benali and Head Works Site at Mohisila including pumping machineries, SCADA for the total system on EPC/Turnkey basis in a single package including 3 (Three) months Trial Run and Operation & Maintenance for 5 years for Surface Based W/S Scheme for RCFA Part-II Augmentation Water Supply Scheme as per scope of contract. ORD/000377/2023-2024 2514/RCD-I 25/08/2023 731 GAJA ENGINEERING PRIVATE LIMITED 35,005.02 10,971.46 25
472 RCFA Division -I Formal Work Oder for Construction of 900 cum capacity 20 Mtr staging height RCC Over Head Reservoir (Pipe connection and cost of pipes, specials at (Zone-XI) for Improvement of RCFA Part-I Piped Water Supply Scheme under RCFA Division-I PHE Dte. in the District of Paschim Bardhaman ORD/000380/2022-2023 2005/RCD-I 25/08/2022 365 AMAR CONSTRUCTION 181.00 162.90 100
473 RCFA Division -I Acceptance cum work order for additional work of supplying ,laying and aligning of HDPE Distribution pipeline & allied works including functional household tap connection (FHTC) at Pathanpara command area for Augmentation of Ground Water Based Water Supply Scheme for Telipara under RCFA Division-I PHE Dte. ORD/000385/2025-2026 1759/RCDI 18/06/2025 166 MAK CONSTRUCTION CO 76.14 0.00 50
474 RCFA Division -I Formal work order for Additional work for covering isolated area beyond the NH2 by creating a 2 (Two) nos separate zone under command area of Amlajora PWSS at the embankment of Durgapur Panagarh DVC branch canal situated in between DVC branch canal to Kol-Del Railway track and Biharpur Gram with sinking of 2 nos tube well 300 x 200 mm dia, Construction of Pump House cum/Switch room 5.4 m x 3.6 and laying of LDS with necessary inter connection including all others works of Amlajora PWSS under Augmentation of Amlajora Piped W/S Scheme under RCFA Division-I PHE Dte. ORD/000390/2024-2025 3191/RCD-I 23/12/2024 90 RANADHIR SINHA 156.64 0.00 40
475 RCFA Division -I Formal work order for Creating at 3 (Three) nos Separate Zone of Bamunara PWSS at Banskopa Toll Plaza to Rajbundh Railway Station, Rajbundh Choti, EPIP area of Banskopa mouza and Gopalpur mouza part (40%) situated between NH2 to Kolkata ¿ Delhi Railway track with sinking of 2 nos 300 x 200 mm dia, 01 no 150 x 150 mm dia Tubewell, Construction of Pump House cum Switch Room 5.40 x 3.60 mtr and LDS with necessary interconnection including all others works of Bamunara PWSS under Augmentation of Bamunara Piped Water Scheme under RCFA Division-I PHE Dte. ORD/000391/2024-2025 3190/RCD-I 23/12/2024 180 HANNAN BUILDERS PVT. LTD. 216.57 0.00 45
476 RCFA Division -I Acceptence cum work order for Dedicated line towards Paharpur village, Kallya village and necessary repairing including supply of valve construction of valve chamber etc. within Distribution Network of Dabor OHR under Chotkara Kanskuli Water Supply Scheme under RCFA Division-I PHE Dte. ORD/000395/2023-2024 2577/RCD-I 07/09/2023 15 DHRUBA ENTERPRISE 9.05 7.30 100
477 RCFA Division -I Acceptance cum work order for additional work of construction of IEP, drain and platform and other allied works at Kanchanpur under Augmentation of Kanchanpur Piped water supply scheme under RCFA Division-I PHE Dte. ORD/000395/2025-2026 1761/RCDI 18/06/2025 30 RUPALI ELECTRONICS 15.48 0.00 0
478 RCFA Division -I Laying of distribution system at Khottamdihi village including FHTC works under Kendra Khottamdihi W/S Scheme under RCFA Div-I, PHE dte. ORD/000399/2022-2023 2643/RCDI 28/10/2022 225 JAYANTA DATTA 100.00 45.79 100
479 RCFA Division -I Acceptence cum work order for Additional work repairing old plaster surface, color washing, painting and R.B.T. (Reinforced Barbed Tape) Concertina fencing on wall and allied works at Kalyaneswari Inspection Bungalow under RCFA Division-I PHE Dte ORD/000399/2023-2024 2581/RCD-I 07/09/2023 15 JYOGOMAYA ENTERPRISE 5.71 5.14 100
480 RCFA Division -I Providing FHTC through retrofitting under Augmentation of Jamgram PWSS (Part-I) under RCFA Div-I, PHE Dte. ORD/000404/2022-2023 2519/RCDI 20/10/2022 712 MAA ENTERPRISE 22.60 14.53 60
481 RCFA Division -I Providing FHTC through retrofitting under Augmentation of Jamgram PWSS (Part-I) under RCFA Div-I, PHE Dte. ORD/000405/2022-2023 2520/RCDI 20/10/2022 30 B.T.M CONCERN 50.77 26.46 65
482 RCFA Division -I Acceptance cum work order for Laying 450 mm dia MS water pipe line with 700 mm dia MS casing pipe for Railway crossing in Salanpur at KM SLS/1136 and SLS/1138 on Bemjomary siding Railway line in Asansol Division under JJM under RCFA Division-I PHE Dte. ORD/000422/2023-2024 2620/RCD-I 13/09/2023 15 MD AAMIR KHAN 38.07 32.09 100
483 RCFA Division -I Acceptance cum work order for Laying 450 mm dia MS water pipe line with 700 mm dia MS casing pipe for Railway crossing in between KM 227/27-29 and between Salanpur (SLS) Rupnarayanpur (RNPR) in Asansol Division under JJM under RCFA Division-I PHE Dte ORD/000423/2023-2024 2621/RCD-I 13/09/2023 15 MAK CONSTRUCTION CO. 62.81 62.23 100
484 RCFA Division -I Acceptance cum work order for Construction of Boundary wall including land development, approach road (Length-65 mtr) and drain (Length-160 mtr) at Malbahal OHR site of Improvement of RCFA Part-I Piped Water Supply Scheme under Salanpur Block under RCFA Division-I PHE Dte. ORD/000431/2023-2024 2662/RCD-I 26/09/2023 583 AMAR CONSTRUCTION 35.50 0.00 100
485 RCFA Division -I Acceptance cum work order for Construction of Boundary wall including land development, approach road (Length-70 mtr) and drain (Length-160 mtr) at Bansketia OHR site of Augmentation of RCFA Part II Piped Water Supply Scheme Volume-I under Salanpur Block under RCFA Division-I PHE Dte. ORD/000432/2023-2024 2663/RCD-I 26/09/2023 30 AMAR CONSTRUCTION 39.04 23.76 100
486 RCFA Division -I Preparation of DPR for Augmentation of Panuria Piped Water Supply Scheme Block - Barabani, Dist - Paschim Bardhaman under RCFA Division-I PHE Dte. ORD/000449/2021-2022 2345/RCD-I 17/12/2021 15 STEELCONC AND ASSOCIATES 3.02 3.02 0
487 RCFA Division -I Engagement of 01 (One) person under control of 02 (Two) nos Assistant Engineers of RCFA Division-I for day to day report and return of FHTC as per scheme wise, Panchayet wise and updation of JJM and verification of FHTC connection of School Aganawadi and Heath Centre and monitoring of report return of training of Asha Karmi under Health Department as per direction of EIC. under RCFA Division-I PHE Dte. (w.e.f. 01.01.2022 to 31.12.2022) (Sl no 03) ORD/000453/2021-2022 2456/RCD I 31/12/2021 365 MUKHERJEE TRADERS 1.73 0.87 0
488 RCFA Division -I Acceptance cum work order for Allied work of laying distribution system, New FHTC and re connection of FHTC at Shibpur of Augmentation of Telipara PWSS under RCFA Division-I PHE Dte. ORD/000455/2025-2026 2010/RCD-I 11/07/2025 30 M/S KALYANI ENTERPRISE 18.97 0.00 0
489 RCFA Division -I Laying UPVC pipeline for FHTC work for Dhandadihi W/S Scheme under RCFA Div-I, PHE Dte.(Sl no 01) ORD/000456/2021-2022 2458/RCD I 31/12/2021 10 MACHINO TECHNO 3.83 3.82 0
490 RCFA Division -I Acceptance cum work order for Sinking of 2 nos of 300 x 200 mm dia tube well 210 mtr deep by D.R. Rig method using UPVC pipe (CD) and UPVC deep well screen (RDS) at Bandra village and Roopganj of Augmentation of Roopganj PWSS under RCFA Division-I PHE Dte. ORD/000456/2025-2026 2009/RCD-I 11/07/2025 20 M/S KALYANI ENTERPRISE 27.78 0.00 100
491 RCFA Division -I Acceptance cum Work Order for Construction of OHR (Capacity 300 cum, staging Height 20 mtrs) for Augmentation of Sarisathali Piped Water Supply Scheme under RCFA Division-I PHE Dte. Block-Barabani, Dist - Paschim Bardhaman. ORD/000458/2022-2023 2933/RCD-I 17/11/2022 12 M/S CHANDI CHARAN ROY 85.83 85.83 100
492 RCFA Division -I Acceptance cum work order for Construction of 250 cum capacity 20 mtr staging height RCC Over Head Reservoir (pipe connection and cost of pipes, specials at Samlya for Samlya Piped Water Supply Scheme under RCFA Division-I PHE Dte. (Ref Drawing No. PC-I/OHR/10/2012 (Sheet No. 1 & 2) ORD/000459/2022-2023 2934/RCD-I 17/11/2022 12 M/S CHANDI CHARAN ROY 80.02 80.02 100
493 RCFA Division -I Providing FHTC through retrofitting at Kumardiha village area of Chold mouza, GP -Ratibati Block Raniganj of Ratibati water supply scheme under RCFA Division-I PHE Dte.(Sl no 08) ORD/000462/2021-2022 2465/RCD I 31/12/2021 7 D.S.C. CONCERN 4.81 4.81 0
494 RCFA Division -I Additional laying of different dia UPVC pipeline for extension of distribution system regarding FHTC work at Chelod mouza of Ratibati W/S Scheme under RCFA Div-I PHE Dte.(Sl no 09) ORD/000463/2021-2022 2466/RCD I 31/12/2021 15 MACHINO TECHNO 4.78 4.55 0
495 RCFA Division -I Hard rock cutting, laying of different dia UPVC pipe line for extension of distribution system regarding FHTC work at Chelod mouza of Ratibati W/S Scheme under RCFA Div-I PHE Dte.(Sl no 10) ORD/000464/2021-2022 2467/RCD I 31/12/2021 15 MACHINO TECHNO 3.06 2.82 0
496 RCFA Division -I Providing FHTC through retrofitting at Damra rural and adjacent area of Chelod mouza, G.P, Tirat , GP Block Raniganj of Ratibati water supply scheme under RCFA Division-I PHE Dte.(Sl no 11) ORD/000465/2021-2022 2468/RCD I 31/12/2021 10 GOPAL CONSTRUCTION 4.68 4.68 0
497 RCFA Division -I Acceptance cum work order for Additional works of extra cutting Laterate/sand stone of distribution network for RCFA Part-II Piped Water Supply Scheme under RCFA Division-I PHE Dte. (Zone-17) ORD/000465/2023-2024 2871/RCD-1 06/10/2023 90 TARA CONSTRUCTION 24.96 24.82 100
498 RCFA Division -I Acceptance cum work order for Additional works of extra cutting Laterate/sand stone of distribution network for RCFA Part-II Piped Water Supply Scheme under RCFA Division-I PHE Dte. (Zone-18) ORD/000466/2023-2024 2872/RCD-1 06/10/2023 90 SWATI CORPORATION 21.83 21.48 100
499 RCFA Division -I Acceptance cum work order for Additional work laying of different dia HDPE & MS pipe including installation of sluice valve and chamber in different location of Dakshin Khanda & Khandra GP under Ondal Block under RCFA Division-I PHE Dte. ORD/000468/2023-2024 2860/RCD-I 06/10/2023 30 UNITED CONSTRUCTION 25.34 22.45 90
500 RCFA Division -I Preparation of DPR for Augumentation of Roshna Piped Water Supply Scheme Block - Barabani, Dist - Paschim Bardhaman under RCFA Division-I PHE Dte. (Sl No. 05) ORD/000479/2021-2022 2349/RCD I 17/12/2021 15 STEELCONC AND ASSOCIATES 3.03 3.03 0
501 RCFA Division -I Formal Work Order for Supplying, laying and aligning of distribution system including FHTC for Shyamla W/S Scheme in Syamla and Bhuri Mouza, Block ¿ Jamuria, Dist ¿ Bardhaman under Shyamla W/S Scheme under RCFA Division-I PHE Dte. (Part ¿ C) ORD/000479/2022-2023 2029/RCD-I 30/08/2022 1030 SWATI CORPORATION 337.77 234.46 85
502 RCFA Division -I Preparation of DPR for Augumentation of Sarshatali Piped Water Supply Scheme Block - Barabani, Dist - Paschim Bardhaman under RCFA Division-I PHE Dte.(Sl No 04) ORD/000480/2021-2022 2348/RCD I 17/12/2021 15 STEELCONC AND ASSOCIATES 2.88 2.88 0
503 RCFA Division -I Preparation of DPR for Augumentation of Jamgram Piped Water Supply Scheme Block - Barabani, Dist - Paschim Bardhaman under RCFA Division-I PHE Dte.(sl no 03) ORD/000481/2021-2022 2347/RCD I 17/12/2021 15 STEELCONC AND ASSOCIATES 2.88 2.88 0
504 RCFA Division -I Preparation of DPR for Augumentation of Itapara Piped Water Supply Scheme Block - Barabani, Dist - Paschim Bardhaman under RCFA Division-I PHE Dte. (Sl No. 02) ORD/000482/2021-2022 2346/RCD I 17/12/2021 15 STEELCONC AND ASSOCIATES 2.82 2.82 0
505 RCFA Division -I Acceptance cum work order for 2nos of Emergency repairing work of 450 mm dia rising main at Upper Jamdoba and Nichu Para under RCFA Part-II W7S scheme under RCFA Div-I, PHE Dte. ORD/000483/2023-2024 2890/RCD-I 06/10/2023 15 KHEPI MAA TRADERS 2.29 2.29 100
506 RCFA Division -I Acceptance cum work order for Laying of 90mm dia HDPE pipe and allied works at Bauri para of Khandra area of Block-Ondal under RCFA Part-II water supply scheme under RCFA Div-I, PHE Dte. ORD/000487/2023-2024 2893/RCD-I 06/10/2023 15 KHEPI MAA TRADERS 2.33 2.33 100
507 RCFA Division -I Laying of different dia UPVC pipeline for extension system regarding FHTC work at Chelod village of Ratibati W/S Scheme under RCFA Div-I PHE Dte. ORD/000488/2021-2022 2464/RCD-I 31/12/2021 15 MOTIONMASS TECHNO (OPC) PRIVATE LIMITED 4.81 2.35 0
508 RCFA Division -I Acceptance cum work order for Laying and interconnection work of different dia HDPE pipe line unde Dakshin Khanda area Khandra Zone under RCFA Pt-II W/S Scheme under RCFA Division-I PHE Dte. ORD/000489/2021-2022 118/RCD-I 20/01/2022 30 UNITED CONSTRUCTION 13.96 10.91 0
509 RCFA Division -I Acceptance cum work order for Construction of CWR (90 cum) at Surjanagar Head Works Site to replace existing damaged CWR under Improvement of RCFA (Part-I) Piped Water Supply Scheme. ORD/000490/2021-2022 376/RCD-I 15/02/2022 30 MD AAMIR KHAN 22.72 10.42 100
510 RCFA Division -I Acceptance cum work order for Providing FHTC through Retrofitting at Ukhra Area (Phase-II) Block-Andal & Pandabeswar of Ukhra Water Supply Scheme under RCFA Division-I PHE Dte. (Part-C) 2nd Call ORD/000491/2021-2022 120/RCD-I 20/01/2022 30 GLOBAL CONSTRUCTION 14.23 13.36 0
511 RCFA Division -I Acceptance cum work order for Additional works of concrete dismantling & re concreting with other allied works at distribution networks including additional laying of pipe line for RCFA Part-II Piped Water Supply Scheme under RCFA Div-I PHE Dte. (Zone-18) ORD/000493/2023-2024 2885/RCD-1 06/10/2023 30 SWATI CORPORATION 73.24 60.80 100
512 RCFA Division -I Acceptance cum work order for Providing FHTC through Retrofitting at Sanyasi Kalitala (Sansad-XVI) Block-Andal & Pandabeswar of Ukhra Water Supply Scheme under RCFA Division-I PHE Dte. ORD/000496/2021-2022 2491/RCD-I 31/12/2021 30 TARA CONSTRUCTION 11.24 10.92 0
513 RCFA Division -I Acceptance cum work order for Providing FHTC through Retrofitting at Asthana (Sansad-IX) Block-Andal & Pandabeswar of Ukhra Water Supply Scheme under RCFA Division-I PHE Dte. 2nd Call ORD/000498/2021-2022 198/RCD-I 28/01/2022 30 B M SARKAR 13.04 10.18 0
514 RCFA Division -I Laying of different dia HDPE pipe line including repairing work of UPVC pipe line and etc. allied works under Khandra Zone distribution pipe line under RCFA Part-II W/S Scheme under RCFA Division-I PHE Dte. (Sl No. 10) ORD/000508/2021-2022 222/RCD I 01/02/2022 15 UNITED CONSTRUCTION 4.79 4.79 0
515 RCFA Division -I Acceptance cum work order for Conducting route survey, design rising main network and preparation & submission of source augmentation DPR for BAHADURPUR Water Supply Scheme for Implementation of JJM at Jamuria Block under RCFA DIVISION-I, P.H.E. Dte. ORD/000508/2023-2024 2970/RCD-I 11/10/2023 15 SIRCON ENGINEERING SERVICES 4.97 4.97 100
516 RCFA Division -I Supply, fitting fixing of street stand posts and crossing of distribution water branch main through Khandra main road and etc. including interconnection work under Khandra Zone under RCFA Part-II W/S Scheme. (Sl No. 11) ORD/000509/2021-2022 223/RCD I 01/02/2022 12 UNITED CONSTRUCTION 2.61 2.61 0
517 RCFA Division -I Acceptance cum work order for Conducting route survey, design rising main network and preparation & submission of source augmentation DPR for HARIPUR Water Supply Scheme for Implementation of JJM at Pandabeswar Block under RCFA DIVISION-I, P.H.E. Dte. ORD/000509/2023-2024 2971/RCD-I 11/10/2023 15 RISHAN ENGINEERING CONSULTANCY 4.97 4.97 100
518 RCFA Division -I Laying of 25 mm dia PVC pipe line at Ukhra Adarsha Hindi High School and installation of Street stand post and etc. allied works at Dakshin Khanda area under RCFA Division-I PHE Dte. (Sl No. 12) ORD/000510/2021-2022 224/RCD I 01/02/2022 15 UNITED CONSTRUCTION 4.63 4.63 0
519 RCFA Division -I Cleaning compound premises, painting works and preparing approched road with sand and stone dust and other allied works at Kalyaneswari Inspection bunglow under Bahual Retrofitting under RCFA Division-I PHE Dte. (Sl No. 13) ORD/000511/2021-2022 225/RCDI 01/02/2022 7 JYOGOMAYA ENTERPRISE 1.81 1.81 100
520 RCFA Division -I Acceptance cum work order for Allied work for bridge at Chalbalpur in connection with the laying distribution system for Amritnagar Zone-II under Augmentation of RCFA Part-II (Zone-15) under RCFA Division-I PHE Dte. ORD/000514/2023-2024 2865/RCD-I 06/10/2023 90 MRITYUNJOY MUKHERJEE & CO. 70.40 52.84 100
521 RCFA Division -I Acceptance cum work order for Crossing 600 mm dia MS Pipes under the Railway track by jack pushing technology at different spots and pushing different dia MS Pipes through 600 mm dia MS pipes in connection with the work of estimates for the laying distribution system for Amritnagar Zone-II under Augmentation of RCFA Part-II (Zone-17) under RCFA Division-I PHE Dte. (Part-A). ORD/000515/2023-2024 2866/RCD-I 06/10/2023 30 MACHINO TECHNO 88.08 88.08 100
522 RCFA Division -I Acceptance cum work order for Distribution of pipe line from Alinagar OHR to Khattardihi Village via Minsa Das Para including Laying & Pushing by adopting trench less technology (e.g, Jack Pushing Method etc) & other allied work under Shyamla GP under Augmentation PWSS of RCFA Part-II (Zone-2) Block - Andal, Dist - Paschim Bardhaman under RCFA Division-I PHE Dte. ORD/000515/2024-2025 115/RCD-I 08/01/2025 45 SILPO UDYOG ENGINEERING CONSTRUCTIONS 47.67 9.81 80
523 RCFA Division -I Acceptance cum work order for Laying 450 mm dia MS water pipe line with 700 mm dia MS casing pipe for Railway crossing in Salanpur in between KM 227/31-33 and Salanpur (SLS) ¿ Rupnarayanpur (RNPR) Station in Asansol Division of JJM under Augmentation of RCFA Part-II (Zone-3) under RCFA Division-I PHE Dte. ORD/000518/2023-2024 2870/RCD-I 06/10/2023 30 SWATI CORPORATION 67.30 60.10 100
524 RCFA Division -I Acceptance cum work order for Construction of new boundary wall, Land developing and Pathway and other allied works at Nimsa mouza RCC over Head Site at Shyamla under Augmentation of RCFA Part-II (Zone-5) under RCFA Division-I PHE Dte. (Length 188 Mtr) ORD/000519/2023-2024 2873/RCD-I 06/10/2023 90 M/S CHANDI CHARAN ROY 21.97 13.21 100
525 RCFA Division -I Acceptance cum work order for Construction of CWR (Clear Water Reservoir) of capacity 100 cum & allied work at Bagdiha under Augmentation of RCFA Part-II (Zone-15) under RCFA Division-I PHE Dte. ORD/000520/2023-2024 2877/RCD-I 06/10/2023 90 M/S KALYANI ENTERPRISE 18.69 0.00 0
526 RCFA Division -I Acceptance cum work order for Construction of Guard room with toilet at Shyamla Over Head site under Augmentation of RCFA Part-II (Zone-17) under RCFA Division-I PHE Dte. ORD/000521/2023-2024 2879/RCD-I 06/10/2023 90 G. CONSTRUCTION 5.48 5.35 100
527 RCFA Division -I Acceptance cum work order for Additional extra cutting Laterate/sandstone of distribution of pipe line at Augmentation of RCFA Part-II (Zione-8) within command area under RCFA Division-I PHE Dte. ORD/000522/2023-2024 2880/RCD-I 06/10/2023 90 SWATI CORPORATION 10.60 10.60 100
528 RCFA Division -I Sub Soil Investigation for 200 cum capacity RCC Over Head Reservoir of Jamuria Block for Augmentation of Jamuria Rural-II Piped Water Supply Scheme under RCFA Division-I PHE Dte. in the District of Paschim Bardhaman ORD/000524/2022-2023 3137/RCDI 12/12/2022 7 P.K TEWARY DRILLING CO. 0.55 0.00 0
529 RCFA Division -I Acceptance cum work order for Additional Supplying. Aligning and laying MS pipe (Node no. 45-47, 61-62, 5-16, 44-45) construction of Guard wall, concrete dismantling with re concreting and other allied works for Shyamla & Bhuri Mouzas, Block-Jamuria, Dist-Paschim Bardhaman under Augmentation of RCFA Part-II (Zone-5) under RCFA Division-I PHE Dte. (Part-C) ORD/000524/2023-2024 2882/RCD-I 06/10/2023 30 TARA CONSTRUCTION 13.80 10.84 100
530 RCFA Division -I Sub Soil Investigation for 350 cum capacity RCC Over Head Reservoir of Jamuria Block for Augmentation of Jamuria Rural-I Piped Water Supply Scheme under RCFA Division-I PHE Dte. in the District of Paschim Bardhaman ORD/000525/2022-2023 3138/RCDI 12/12/2022 7 P.K TEWARY DRILLING CO. 0.55 0.55 100
531 RCFA Division -I Sub Soil Investigation for 200 cum capacity RCC Over Head Reservoir of Barabani Block for Augmentation of Jamgram Piped Water Supply Scheme under RCFA Division-I PHE Dte. in the District of Paschim Bardhaman ORD/000526/2022-2023 3139/RCDI 12/12/2022 7 P.K TEWARY DRILLING CO. 0.55 0.55 100
532 RCFA Division -I Acceptance Order for distribution network for Augmentation of RCFA Part-II Piped Water Supply Scheme including FHTC within command area of Zone-15 under JAMURIA Block in the district of Paschim Bardhhaman under RCFA Division - I PHE Dte. [PART-C] ORD/000526/2025-2026 2148/RCD-I 28/07/2025 90 UNITED CONSTRUCTION 129.89 0.00 0
533 RCFA Division -I Sub Soil Investigation for 300 cum capacity RCC Over Head Reservoir of Barabani Block for Augmentation of Roshna Piped Water Supply Scheme under RCFA Division-I PHE Dte. in the District of Paschim Bardhaman ORD/000527/2022-2023 3140/RCDI 12/12/2022 7 P.K TEWARY DRILLING CO. 0.55 0.00 50
534 RCFA Division -I Sub Soil Investigation for 300 cum capacity RCC Over Head Reservoir of Barabani Block for Augmentation of Sarisatali Piped Water Supply Scheme under RCFA Division-I PHE Dte. in the District of Paschim Bardhaman ORD/000528/2022-2023 3141/RCDI 12/12/2022 7 P.K TEWARY DRILLING CO. 0.55 0.55 100
535 RCFA Division -I Sub Soil Investigation for 350 cum capacity RCC Over Head Reservoir of Barabani Block for Augmentation of Panuria Piped Water Supply Scheme under RCFA Division-I PHE Dte. in the District of Paschim Bardhaman ORD/000529/2022-2023 3142/RCDI 12/12/2022 7 P.K TEWARY DRILLING CO. 0.55 0.55 100
536 RCFA Division -I Sub Soil Investigation for 900 cum capacity RCC Over Head Reservoir (Zone-XI) of Barabani Block for Improvement of RCFA Part-I Piped Water Supply Scheme under RCFA Division-I PHE Dte. in the District of Paschim Bardhaman ORD/000530/2022-2023 3143/RCDI 12/12/2022 7 P.K TEWARY DRILLING CO. 0.55 0.00 100
537 RCFA Division -I Acceptance cum Work Order for Distribution Network for Improvement RCFA Part-I Water Supply Scheme within command area of Zone - XI (Part-1 Distribution Segment) under RCFA Division-I PHE Dte. ORD/000531/2021-2022 491/RCD-I 24/02/2022 90 R B ENTERPRISE 27.59 26.92 85
538 RCFA Division -I Sub Soil Investigation for 200 cum capacity RCC Over Head Reservoir of Jamuria Block for Augmentation of Churulia Piped Water Supply Scheme under RCFA Division-I PHE Dte. in the District of Paschim Bardhaman ORD/000531/2022-2023 3144/RCDI 12/12/2022 7 P.K TEWARY DRILLING CO. 0.55 0.55 100
539 RCFA Division -I Acceptance cum work order for Health assessment of existing OHR of ASTA (1135 Cum) and ancillary structures conducting Non-Destructive Test and thorough visual observation under RCFA Division-I PHE Dte. ORD/000531/2023-2024 3021/RCD-I 16/10/2023 15 SIRCON ENGINEERING SERVICES 4.98 4.98 100
540 RCFA Division -I Acceptance cum Work Order for Distribution Network for Improvement RCFA Part-I Water Supply Scheme within command area of Zone - XI (Part-2 Distribution Segment) under RCFA Division-I PHE Dte. ORD/000532/2021-2022 492/RCD-I 24/02/2022 90 SNEHA ELECTRIC 25.78 25.39 75
541 RCFA Division -I Acceptance cum Work Order for Distribution Network for Improvement RCFA Part-II Water Supply Scheme within command area of Zone-16 including FHTC work (Part-A) under RCFA Div-I PHE Dte. (Mouza-Sahebganj) ORD/000532/2022-2023 3160/RCD-I 13/12/2022 30 KRISHNA KUMAR TODI HUF 88.68 79.11 100
542 RCFA Division -I Acceptance cum work order for Health assessment of existing OHR of Dendua(1135Cum) and ancillary structure sconducting Non-Destructive Test and thorough visual observation under RCFA Division-I PHE Dte. ORD/000532/2023-2024 3014/RCD-I 16/10/2023 15 SIRCON ENGINEERING SERVICES 4.98 4.98 100
543 RCFA Division -I Acceptance cum Work Order for Distribution Network for Improvement RCFA Part-I Water Supply Scheme within command area of Zone - XI (Part-3 Distribution Segment) under RCFA Division-I PHE Dte. ORD/000533/2021-2022 493/RCD-I 24/02/2022 401 VISUVIOUS 25.41 23.70 100
544 RCFA Division -I Acceptance cum work order for Health assessment of existing OHR of DP Colony (450 Cum) and ancillary structures conducting Non-Destructive Test and thorough visual observation under RCFA Division-I PHE Dte. ORD/000533/2023-2024 3022/RCD-1 16/10/2023 15 SIRCON ENGINEERING SERVICES 4.93 4.93 100
545 RCFA Division -I Detailed Route Survey, Design Drawing & DPR Preparation for Amritnagar Zone-I Piped Water Supply Scheme under RCFA Division-I PHE Dte. (sL no. 01) ORD/000534/2021-2022 500/RCD-I 24/02/2022 15 SRIJAN ECOLOGICAL UPLIFTMENT PVT. LTD. 4.04 4.04 0
546 RCFA Division -I Formal work order for Distribution network for augmentation of Sarisathali piped Water Supply scheme including FHTC work, Block-Baraboni, Dist-Paschim Bardhaman under RCFA Div-I, PHE Dte (Part-D) ORD/000534/2022-2023 3231//RCDI 19/12/2022 987 SRI KRISHNA ENTERPRISE 133.36 14.98 100
547 RCFA Division -I Acceptance cum work order for Health assessment of existing OHR of Rupnarayanpur (1182 Cum) and ancillary structures conducting Non-Destructive Test and thorough visual observation under RCFA Division-I PHE Dte. ORD/000534/2023-2024 3015/RCD-I 16/10/2023 15 SIRCON ENGINEERING SERVICES 4.98 4.98 100
548 RCFA Division -I Detailed Route Survey, Design Drawing & DPR Preparation for Ondal (Phase-I) Piped Water Supply Scheme under RCFA Division-I PHE Dte. (Sl No. 02) ORD/000535/2021-2022 501/RCD-I 24/02/2022 15 SRIJAN ECOLOGICAL UPLIFTMENT PVT. LTD. 3.91 3.91 0
549 RCFA Division -I Acceptance cum work order for Health assessment of existing OHR of Ethora (779 Cum) and ancillary structures conducting Non-Destructive Test and thorough visual observation under RCFA Division-I PHE Dte. ORD/000535/2023-2024 3016/RCD-I 16/10/2023 15 SIRCON ENGINEERING SERVICES 4.93 4.93 100
550 RCFA Division -I Acceptance cum Work Order for Distribution Network for Improvement RCFA Part-I Water Supply Scheme within command area of Zone - XI (Part-4 Distribution Segment) under RCFA Division-I PHE Dte. ORD/000536/2021-2022 494/RCD-I 24/02/2022 1042 DAWN CONSTRUCTION 68.87 65.56 100
551 RCFA Division -I Acceptance cum work order for Health assessment of existing OHR of Pariharpur (900 Cum) and ancillary structures conducting Non-Destructive Test and thorough visual observation under RCFA Division-I PHE Dte. ORD/000536/2023-2024 3023/RCD-1 16/10/2023 15 RISHAN ENGINEERING CONSULTANCY 4.95 4.95 100
552 RCFA Division -I Detailed Route Survey, Design Drawing & DPR Preparation for Ondal (Phase-II) Piped Water Supply Scheme under RCFA Division-I PHE Dte. (Sl No. 03) ORD/000537/2021-2022 502/RCD-I 24/02/2022 15 SRIJAN ECOLOGICAL UPLIFTMENT PVT. LTD. 4.54 4.54 0
553 RCFA Division -I Acceptance cum work order for Health assessment of existing OHR of Pancgachia (240 Cum) and ancillary structures conducting Non-Destructive Test and thorough visual observation under RCFA Division-I PHE Dte. ORD/000537/2023-2024 3017/RCD-I 16/10/2023 15 SIRCON ENGINEERING SERVICES 4.92 4.92 100
554 RCFA Division -I Acceptance cum work order for Balance work of dismantling of concrete, restoration of road including pipe crossing by adopting trenchless technologies (e.g. Jack Pushing Method etc.) 03 nos. location at Haripur (Zone-14C) within Pandabeswar Block of Augmentation of PWSS RCFA Part-II (Zone-14C) under RCFA Division-I PHE Dte. ORD/000537/2024-2025 140/RCD-I 08/01/2025 90 MD AAMIR KHAN 85.12 0.00 60
555 RCFA Division -I Acceptance cum Work Order for Distribution Network for Improvement RCFA Part-I Water Supply Scheme within command area of Zone - XI (Part-5 Distribution Segment) under RCFA Division-I PHE Dte. ORD/000538/2021-2022 495/RCD-I 24/02/2022 1101 M/S B.K. CONSTRUCTION 44.11 37.17 100
556 RCFA Division -I Detailed Route Survey, Design Drawing & DPR Preparation for Madantor Piped Water Supply Scheme under RCFA Division-I PHE Dte. (Sl No. 4) ORD/000539/2021-2022 503/RCD-I 24/02/2022 15 SRIJAN ECOLOGICAL UPLIFTMENT PVT. LTD. 4.04 4.04 0
557 RCFA Division -I Acceptance cum work order for Health assessment of existing OHR of Barabani (910 Cum) and ancillary structures conducting Non-Destructive Test and thorough visual observation under RCFA Division-I PHE Dte. ORD/000539/2023-2024 3018/RCD-I 16/10/2023 15 SIRCON ENGINEERING SERVICES 4.95 4.95 100
558 RCFA Division -I Detailed Route Survey, Design Drawing & DPR Preparation for Amritnagar Zone-II Piped Water Supply Scheme under RCFA Division-I PHE Dte. (Sl No. 05) ORD/000540/2021-2022 504/RCD-I 24/02/2022 15 SRIJAN ECOLOGICAL UPLIFTMENT PVT. LTD. 4.23 4.23 0
559 RCFA Division -I Acceptance cum work order for Health assessment of existing OHR of Chora (1135Cum) and ancillary structures conducting Non-Destructive Test and thorough visual observation under RCFA Division-I PHE Dte. ORD/000540/2023-2024 3025/RCD-1 16/10/2023 15 RISHAN ENGINEERING CONSULTANCY 4.97 4.97 100
560 RCFA Division -I Acceptance cum Work Order for Distribution Network for Improvement RCFA Part-I Water Supply Scheme within command area of Zone - XI (Part-6 Distribution Segment) under RCFA Division-I PHE Dte. ORD/000541/2021-2022 496/RCD-I 24/02/2022 1087 UMA ENTERPRISE 63.83 54.82 70
561 RCFA Division -I Acceptance cum Work Order for Distribution Network for Improvement RCFA Part-I Water Supply Scheme within command area of Zone - XI (Part-7 Distribution Segment) under RCFA Division-I PHE Dte. ORD/000542/2021-2022 497/RCD-I 24/02/2022 90 UNITED CONSTRUCTION 23.75 23.72 80
562 RCFA Division -I Acceptance cum Work Order for Distribution Network for Improvement RCFA Part-I Water Supply Scheme within command area of Zone - XI (Part-8 Distribution Segment) under RCFA Division-I PHE Dte. ORD/000543/2021-2022 498/RCD-I 24/02/2022 90 SIMA ENTERPRISE 30.98 29.26 81
563 RCFA Division -I Acceptance cum work order for construction of 200 cum capacity 20 mtr staging height RCC over Head Reservoir, pipe connection and cost of pipes specials of Churulia piped Water Supply Scheme under RCFA Div-I PHE Dte in the District of Paschim Bardhaman. Ref PC-I/OHR/09/2021 ORD/000543/2022-2023 3245/RCD I 20/12/2022 274 ASHA CONSTRUCTION 71.55 71.55 100
564 RCFA Division -I Acceptance cum work order for Health assessment of existing OHR of Amritnagar (1135 Cum) and ancillary structures conducting Non-Destructive Test and thorough visual observation under RCFA Division-I PHE Dte. ORD/000543/2023-2024 3026/RCD-1 16/10/2023 15 RISHAN ENGINEERING CONSULTANCY 4.97 4.97 100
565 RCFA Division -I Acceptance cum Work Order for Distribution Network for Improvement RCFA Part-I Water Supply Scheme within command area of Zone - XI (Part-9 Distribution Segment) under RCFA Division-I PHE Dte. ORD/000544/2021-2022 499/RCD-I 24/02/2022 90 SOMNATH SAMANTA 39.28 38.73 98
566 RCFA Division -I Acceptance cum work order for Supply and delivery of GI pipe including loading, unloading and carriage to Searsole Store under RCFA Part-II PWSS under RCFA Division-I PHE Dte ORD/000550/2023-2024 3044/RCD-I 17/10/2023 20 INDIA PIPE FITTING CO 94.09 93.19 100
567 RCFA Division -I Additional work of supplying, aligning and laying of 160 mm dia HDPE pipe line for distribution line at Bolkundi village under Chotkara Kanskuli Water Supply Scheme under RCFA Division-I PHE Dte. (Sl No. 07) ORD/000551/2021-2022 250/RCD-I 01/02/2022 15 DAS & CHAKRABORTY 2.05 2.05 0
568 RCFA Division -I Additional work for laying of different dia DI (K7) & HDPE pipe line with other allied work from Dabor OHR Zone-II (Lohat, Phulberiya, Patal, Sadhana, Madhaichak, Shyamdihi etc.) distribution Chotkara Kanskuli Water Supply Scheme under RCFA Division-I PHE Dte. (Part-B) (Sl No. 08) ORD/000552/2021-2022 251/RCD-I 01/02/2022 15 ASHA CONSTRUCTION 2.18 1.96 0
569 RCFA Division -I Supplying, aligning and laying of HDPE line (Parallel to main distribution) for Ghidoba village & Kushum Danali West side for providing FHTC work under Chotkara Kanskuli Water Supply Scheme under RCFA Division-I PHE Dte. (Sl No. 09) ORD/000553/2021-2022 252/RCD-I 01/02/2022 20 GITA CONSTRUCTION 4.98 4.71 0
570 RCFA Division -I Sub Soil Investigation for 400 cum capacity RCC Over Head Reservoir at (Zone-13) of Pandabeswar Block for Augmentation of RCFA Part-II Piped Water Supply Scheme under RCFA Division-I PHE Dte. in the District of Paschim Bardhaman ORD/000553/2022-2023 3347/RCDI 23/12/2022 782 MOYTEC 0.46 0.00 100
571 RCFA Division -I Supplying, aligning and laying of 90 mm dia HDPE pipe line (Parallel to main distribution) at village Kushum Danali more towords Ghidoba West side for providing FHTC work under Chotkara Kanskuli Water Supply Scheme under RCFA Division-I PHE Dte. (Sl No. 10) ORD/000554/2021-2022 253/RCD-I 01/02/2022 20 GITA CONSTRUCTION 4.99 4.71 0
572 RCFA Division -I Sub Soil Investigation for 1250 cum capacity RCC Over Head Reservoir at (Zone-14A) of Pandabeswar Block for Augmentation of RCFA Part-II Piped Water Supply Scheme under RCFA Division-I PHE Dte. in the District of Paschim Bardhaman ORD/000554/2022-2023 3348/RCDI 23/12/2022 782 G. MITRA & ASSOCIATES 0.50 0.00 100
573 RCFA Division -I Sub Soil Investigation for 600 cum capacity RCC Over Head Reservoir at (Zone-19) of Pandabeswar Block for Augmentation of RCFA Part-II Piped Water Supply Scheme under RCFA Division-I PHE Dte. in the District of Paschim Bardhaman ORD/000555/2022-2023 3349/RCDI 23/12/2022 782 MOYTEC 0.49 0.00 100
574 RCFA Division -I Sub Soil Investigation for 350 cum capacity RCC Over Head Reservoir at (Zone-11) of Raniganj Block for Augmentation of RCFA Part-II Piped Water Supply Scheme under RCFA Division-I PHE Dte. in the District of Paschim Bardhaman ORD/000556/2022-2023 3350/RCDI 23/12/2022 770 MOYTEC 0.49 0.49 100
575 RCFA Division -I Sub Soil Investigation for 450 cum capacity RCC Over Head Reservoir at (Zone-18) of Raniganj Block for Augmentation of RCFA Part-II Piped Water Supply Scheme under RCFA Division-I PHE Dte. in the District of Paschim Bardhaman ORD/000557/2022-2023 3351/RCDI 23/12/2022 7 MOYTEC 0.49 0.49 100
576 RCFA Division -I Acceptance cum work order for Repair and renovation works of One no. RCC Elevated Reservoir of Capacity 250 cum at Madantore under Augmentation of Madantore Piped water Supply scheme under RCFA division-I PHE dte. ORD/000557/2023-2024 3186/RCD-I 01/11/2023 270 A.K.CONSTRUCTION 10.95 8.90 100
577 RCFA Division -I Acceptance cum work order for Laying of different dia PVC/HDPE pipe line for extension of distribution system regarding FHTC work at Ratibati Mouza of Ratibati Water Supply Scheme under RCFA Div-I PHE Dte. ORD/000558/2021-2022 581/RCD-I 02/03/2022 15 SOMNATH SAMANTA 9.58 9.55 0
578 RCFA Division -I Sub Soil Investigation for 500 cum capacity RCC Over Head Reservoir at (Zone-17) of Raniganj Block for Augmentation of RCFA Part-II Piped Water Supply Scheme under RCFA Division-I PHE Dte. in the District of Paschim Bardhaman ORD/000558/2022-2023 3352/RCDI 23/12/2022 7 MOYTEC 0.49 0.49 100
579 RCFA Division -I Acceptance cum work order for Repair and renovation works of Clear Water Reservoir of Capacity 150 cum for Augmentation of Madantore Piped water Supply scheme under RCFA division-I PHE dte. ORD/000558/2023-2024 3187/RCD-I 01/11/2023 180 A.K.CONSTRUCTION 10.86 0.00 0
580 RCFA Division -I Acceptance cum work order for Construction of CWR (Clear Water Reservoir) of capacity 200 cum & allied work at Shankarpur under Pandabeswar H/W Site within Pandabeswar Block for Augmentation of PWSS of RCFA Part-II (Zone-12B) under RCFA Division-I PHE Dte. ORD/000558/2024-2025 162/RCD-I 08/01/2025 90 DIP CONSTRUCTION 34.75 0.00 0
581 RCFA Division -I Sub Soil Investigation for 600 cum capacity RCC Over Head Reservoir at (Zone-16) of Raniganj Block for Augmentation of RCFA Part-II Piped Water Supply Scheme under RCFA Division-I PHE Dte. in the District of Paschim Bardhaman ORD/000559/2022-2023 3353/RCDI 23/12/2022 7 MOYTEC 0.49 0.49 100
582 RCFA Division -I Acceptance cum work order for Laying of different dia HDPE pipe line towards Teli Para (Sansad -XIV) under Ukhra area Block- Andal & Pandabswar of Augmentation of RCFA Part-II (Zone-2) Water Supply Scheme under RCFA Division-I PHE Dte. ORD/000559/2023-2024 3188/RCD-I 01/11/2023 15 NILIMA CONSTRUCTION 2.49 2.30 100
583 RCFA Division -I Sub Soil Investigation for 450 cum capacity RCC Over Head Reservoir at (Zone-7) of Jamuria Block for Augmentation of RCFA Part-II Piped Water Supply Scheme under RCFA Division-I PHE Dte. in the District of Paschim Bardhaman ORD/000560/2022-2023 3354/RCDI 23/12/2022 782 MOYTEC 0.49 0.00 100
584 RCFA Division -I Urgent Basis rapairing of 50 sqmm x 4 core Al Armoured Damaged cable line street Light Providing of FHTC Pipe line near Andal More to Culvert (Bridge) under Dignala OHR dite under Andal W/s scheme under RCFA Division-I, PHE Dte. ORD/000560/2023-2024 SpotNit_Camp_02/AndalMore 09/10/2023 10 T R ENTERPRISE 6.17 6.16 100
585 RCFA Division -I Sub Soil Investigation for 250 cum capacity RCC Over Head Reservoir at (Zone-8) of Jamuria Block for Augmentation of RCFA Part-II Piped Water Supply Scheme under RCFA Division-I PHE Dte. in the District of Paschim Bardhaman ORD/000561/2022-2023 3355/RCDI 23/12/2022 777 MOYTEC 0.49 0.49 100
586 RCFA Division -I Sub Soil Investigation for 350 cum capacity RCC Over Head Reservoir at (Zone-10) of Jamuria Block for Augmentation of RCFA Part-II Piped Water Supply Scheme under RCFA Division-I PHE Dte. in the District of Paschim Bardhaman ORD/000562/2022-2023 3356/RCDI 23/12/2022 782 MOYTEC 0.49 0.00 100
587 RCFA Division -I Sub Soil Investigation for 450 cum capacity RCC Over Head Reservoir at (Zone-15) of Jamuria Block for Augmentation of RCFA Part-II Piped Water Supply Scheme under RCFA Division-I PHE Dte. in the District of Paschim Bardhaman ORD/000563/2022-2023 3357/RCDI 23/12/2022 7 MOYTEC 0.49 0.00 0
588 RCFA Division -I Sub Soil Investigation for 900 cum capacity RCC Over Head Reservoir at (Zone-2) of Ondal Block for Augmentation of RCFA Part-II Piped Water Supply Scheme under RCFA Division-I PHE Dte. in the District of Paschim Bardhaman ORD/000564/2022-2023 3358/RCDI 23/12/2022 7 MOYTEC 0.49 0.48 100
589 RCFA Division -I Sub Soil Investigation for 450 cum capacity RCC Over Head Reservoir at (Zone-5) of Ondal Block for Augmentation of RCFA Part-II Piped Water Supply Scheme under RCFA Division-I PHE Dte. in the District of Paschim Bardhaman ORD/000565/2022-2023 3359/RCDI 23/12/2022 7 MOYTEC 0.49 0.49 100
590 RCFA Division -I Rising Main for Augmentation of Itapara Piped Water Supply Scheme at Baraboni Block Under RCFA - Div - I PHE Dte. ORD/000566/2022-2023 3277/RCD I 20/12/2022 529 DURGADAS MONDAL 34.74 19.21 80
591 RCFA Division -I Acceptance cum work order for rising Main for Augmentation of Jamgram Piped Water Supply Scheme at Baraboni Block Under RCFA - Div - I PHE Dte. ORD/000569/2022-2023 3278/RCD I 20/12/2022 21 DEBI PRASAD MAJI 15.63 11.07 100
592 RCFA Division -I Acceptance cum work order for Construction of Pump House at Jamgram for Augmentation of Jamgarm Piped Water Supply Scheme under RCFA, Division-I, PHE Dte. ORD/000570/2022-2023 3279/RCDI 20/12/2022 468 R B ENTERPRISE 20.73 18.51 100
593 RCFA Division -I Acceptance cum work order Construction of Pump House at Damalia H/W site for Amritnagar Zone-II Water Supply Scheme under RCFA Division-I PHE Dte. ORD/000571/2022-2023 3280/RCDI 20/12/2022 45 B.T.M CONCERN 30.19 30.03 70
594 RCFA Division -I Acceptance cum work order for Construction for Additional works of MS manifold including interconnection in beetween CWR and pump house and etc allied works at Samlya H/W under Samlya W/S Scheme under RCFA Division-I PHe Dte. ORD/000571/2023-2024 2869/RCD-I 06/10/2023 15 MAA ENTERPRISE 6.41 6.16 100
595 RCFA Division -I Supplying, aligning and laying of 90 mm dia HDPE pipe line (Parallel to main distribution) at village Kirtansala (part) and Dharaspur village for providing FHTC work under Chotkara Kanskuli Water Supply Scheme under RCFA Division-I PHE Dte. (Sl 11) ORD/000572/2021-2022 254/RCD-I 01/02/2022 20 DIP CONSTRUCTION 4.95 4.76 0
596 RCFA Division -I Construction of Pump House at Churulia under Madantore Water Supply Scheme under RCFA Division-I PHE Dte. ORD/000572/2022-2023 3281/RCDI 20/12/2022 90 M/S MONDAL ENTERPRISE 30.24 30.24 100
597 RCFA Division -I Supplying, aligning and laying of 90 mm dia HDPE pipe line (Parallel to main distribution) at village Kalya (part) and Siakulberia and Chotkara (Part) village for providing FHTC work under Chotkara Kanskuli Water Supply Scheme under RCFA Division-I PHE Dte. (Sl 12) ORD/000573/2021-2022 255/RCD-I 01/02/2022 20 JAYANTA DATTA 4.99 4.64 0
598 RCFA Division -I Acceptance cum work order for Construction of High Lift Pump House at Riverside H/W site under Augmentation of Jamuria Rural (Zone I & II) Water Supply Scheme under RCFA Division-I PHE Dte. ORD/000573/2022-2023 3282/RCDI 20/12/2022 90 GLOBAL CONSTRUCTION 31.24 27.01 90
599 RCFA Division -I Additional extra cutting Laterrate / sandstone of distribution network for Improvement RCFA Part-I Water Supply Scheme within command area of Zone-VII under RCFA Div-I PHE Dte. (Part-E) ORD/000573/2023-2024 2694/RCD-I 27/09/2023 15 TARA CONSTRUCTION 0.94 0.84 100
600 RCFA Division -I Acceptance cum wor order for Construction of CWR (Clear Water Reservoir) of capacity 200 cum & allied work at Amritnagar under Augmentation of Sub Surface Water Supply Scheme of Amritnagar Zone-II Piped Water Supply Scheme under RCFA Division-I PHE Dte. ORD/000574/2022-2023 3283/RCDI 20/12/2022 90 SOMNATH SAMANTA 22.04 14.00 100
601 RCFA Division -I Supplying, aligning and laying of 90 mm dia HDPE pipe line (Parallel to main distribution) at village Kushum Danali more towords Ghidoba East side under Chotkara Kanskuli Water Supply Scheme under RCFA Division-I PHE Dte. (Sl No. 15) ORD/000575/2021-2022 257/RCD-I 01/02/2022 20 B.T.M CONCERN 4.98 4.75 0
602 RCFA Division -I Acceptance cum work order for Construction of CWR (Clear Water Reservoir) of capacity 200 cum & allied work at Ramprasadpur H/W Site under Augmentation of Sub Surface Water Supply Scheme of Ondal Phase-II/A Piped Water Supply Scheme under RCFA Division-I PHE Dte. ORD/000575/2022-2023 3284/RCDI 20/12/2022 90 SOMNATH SAMANTA 22.05 22.01 70
603 RCFA Division -I Supplying, aligning and laying of 90 mm dia HDPE pipe line (Parallel to main distribution) at village Chotkara (Part) for providing FHTC under Chotkara Kanskuli Water Supply Scheme under RCFA Division-I PHE Dte. (Sl No. 16) ORD/000576/2021-2022 258/RCD-I 01/02/2022 15 JAYANTA DATTA 2.59 2.48 0
604 RCFA Division -I Acceptance cum work order for new pipe line of 200 mm, 90 mm and 75 mm dia at Panuria Bazar under Panuria GP under Augmentation of Panuria Water Supply Scheme under RCFA Division-I PHE Dte. ORD/000576/2022-2023 3285/RCD I 20/12/2022 60 SRI KRISHNA ENTERPRISE 12.15 12.08 0
605 RCFA Division -I Extension of HDPE pipe line (Parallel to main distribution) at village Kirtansala and Dharaspur village (Part) for providing FHTC work under Chotkara Kanskuli Water Supply Scheme under RCFA Division-I PHE Dte. (Sl No. 18) ORD/000578/2021-2022 260/RCD-I 01/02/2022 20 DIP CONSTRUCTION 4.98 4.64 0
606 RCFA Division -I Sub Soil Investigation for 1000 cum capacity RCC Over Head Reservoir at (Zone-12A) of Ondal Block for Augmentation of RCFA Part-II Piped Water Supply Scheme under RCFA Division-I PHE Dte. in the District of Paschim Bardhaman ORD/000578/2022-2023 3366/RCDI 23/12/2022 782 MOYTEC 0.49 0.00 100
607 RCFA Division -I Extension of UPVC pipe line (Parallel to main distribution) at village Ghiadoba and Kusumdanali West side for providing FHTC under Chotkara Kanskuli Water Supply Scheme under RCFA Division-I PHE Dte. (Sl No. 20) ORD/000580/2021-2022 262/RCD-I 01/02/2022 20 GITA CONSTRUCTION 3.58 2.79 0
608 RCFA Division -I Acceptance cum work order for Laying & Pushing of 800 mm dia RCC (NP3) Hume pipe by adopting trench less technology (e.g. Jack Pushing Method etc.) of Water Pipe Lines including supplying and laying of 400 mm dia MS Pipe line at Alladi More on Sitarampur Chittaranjan Road in connection to rising main (Part-A) under Improvement of RCFA Part-I PWSS under RCFA Division-I PHE Dte. ORD/000580/2022-2023 3288/RCD I 20/12/2022 15 MAK CONSTRUCTION CO. 16.45 16.38 0
609 RCFA Division -I Sub Soil investigation for 350 cum capacity RCC Over Head Reservoir at (zone-IX) of Barabani Block for Improvement of RCFA Part-I Piped water Supply Scheme under RCFA Division-I PHE Dte. In the District Paschim Bardhaman. ORD/000580/2023-2024 2695/RCD-I 27/09/2023 7 MALLICK ENTERPRISE 0.98 0.00 0
610 RCFA Division -I Laying of Rising Main (Part-B) at Mohismura Culvat crossing by constructing concrete piller, MS work and allied works under Improvement of RCFA Part-I W/S Scheme under RCFA Division-I PHE Dte. ORD/000581/2022-2023 3289/RCD I 20/12/2022 17 M/S MONDAL ENTERPRISE 10.26 8.52 100
611 RCFA Division -I Sub Soil Investigation for 450 cum capacity RCC Over Head Reservoir at (Zone-XIII) of Barabani Block for Improvement of RCFA Part-I Piped Water Supply Scheme under RCFA Division-I PHE Dte. In the District of Paschim Bardhaman. ORD/000582/2023-2024 2696/RCD-I 27/09/2023 7 JOY HIND TUBEWELLS 0.98 0.00 0
612 RCFA Division -I Acceptance cum work order for dedicated bypass line from Prantapally Durga Mandir to Kalyan Gram under Jitpur Uttarrampur GP under Improvement of RCFA Part-I Water Supply Scheme under RCFA Division-I PHE Dte. ORD/000584/2022-2023 3292/RCD I 20/12/2022 15 ASHA CONSTRUCTION 11.77 11.48 0
613 RCFA Division -I Formal Work Order for Distribution System at Katapahari, Alipur, Baradanga village and surrounding area (Part-B) under Augmentation of Panuria Piped Water Supply Scheme under RCFA Division-I PHE Dte. ORD/000585/2021-2022 598/RCD-I 07/03/2022 60 GITA CONSTRUCTION 78.27 70.11 91
614 RCFA Division -I Formal Work Order for Distribution System at Panuria village at surrounding area (Part-C) under Augmentation of Panuria Piped Water Supply Scheme under RCFA Division-I PHE Dte. ORD/000586/2021-2022 599/RCD-I 07/03/2022 60 A. CONSTRUCTION CO. 76.15 76.13 100
615 RCFA Division -I Laying of different dia distribution pipe line at Ghosalpara, Dharmarajtala, Sabarpara, Dagalpara, Ghosalpara, Kamarpara, MajhiPara etc area of Dakshin Khanda area under Augmentation of RCFA Part-II (Zone-1A) PWSS under RCFA Division-I PHE Dte. ORD/000586/2022-2023 3294/RCD I 20/12/2022 45 UNITED CONSTRUCTION 52.80 52.40 0
616 RCFA Division -I Continuation work order for Supplying, fitting, fixing and fabrication of sign board including printing and carriage to different area with necessary allied works in connection with Improvement of RCFA Part-I Piped Water Supply Scheme under RCFA Division-I PHE Dte. ORD/000589/2023-2024 2263/RCD-I 19/07/2023 20 UNITED CONSTRUCTION 17.51 10.12 60
617 RCFA Division -I Acceptance cum work order for Laying of different dia HDPE pipe line at Pure Jambad Hattala Zone, Real Jambad under Bahula (CT) (Jl No. 30, Block-Pandabeswar under Improvement of RCFA Part-II Water Supply Scheme under RCFA Division-I PHE Dte. ORD/000593/2022-2023 3299/RCD I 20/12/2022 60 GITA CONSTRUCTION 78.64 71.04 90
618 RCFA Division -I Acceptance cum work order for construction of C.W.R. (Clear water Reservoir) of capacity 200 Cu.m & allied Work at Panuria under Augmentation of Panuria Piped Water Supply Scheme under RCFA Divn.-I. P.H.E. Dte. ORD/000594/2022-2023 3276/RCDI 20/12/2022 90 SAMIR KUMAR ROY CHOWDHURY 22.05 20.65 70
619 RCFA Division -I Hiring of SUV (A.C) (Non-Air conditioned) Bharat Stage-VI/BS-VI purchased on or after 01.01.2022 with Diesel/LPG/CNG Engine. For the office Use of the Executive Engineer, RCFA Div-I, PHE Dte Govt. of West Bengal (w.e.f 01.06.2022 to 30.11.2022) ORD/000595/2022-2023 SpotNIQ.Camp-02/Office/AE 31/05/2022 183 PRASENJIT DEY 0.90 0.00 0
620 RCFA Division -I Hiring of SUV (A.C) (Non-Air conditioned) Bharat Stage-VI/BS-VI purchased on or after 01.01.2022 with Diesel/LPG/CNG Engine. For the office Use of the Executive Engineer, RCFA Div-I, PHE Dte Govt. of West Bengal (w.e.f 01.06.2022 to 30.11.2022) ORD/000596/2022-2023 Spot/NIQ/Camp-02/Office/A 31/05/2022 6 PRASENJIT DEY 0.90 0.00 0
621 RCFA Division -I Formal work order for construction of 450 cum capacity 20 mtr staging height RCC over head reservoir pipe connection and cost of pipes, specials at Andal village for Augmentation of Ondal Phase-II/B piped water supply scheme under RCFA Div-I, PHE Dte. in the District of Paschim Bardhaman. ORD/000598/2022-2023 18 /RCD I 05/01/2023 9 AMAR CONSTRUCTION 129.30 129.30 100
622 RCFA Division -I Acceptance cum work order for Construction of Guard room with toilet at Dendua under Salanpur Block for Improvement of RCFA Part-I Water Supply Scheme under RCFA Division-I PHE Dte. ORD/000598/2023-2024 3280/RCD-I 08/11/2023 90 D.S.ENTERPRISE 7.61 7.29 100
623 RCFA Division -I Formal work order for augmentation of Jamuria (Rural)(zone-I) piped water supply scheme including FHTC & allied work within Jamuria Block under RCFA Div-I, PHE Dte.(Part-B) ORD/000599/2022-2023 16/RCD I 05/01/2023 30 DIP CONSTRUCTION 0.00 0.00 0
624 RCFA Division -I Formal work order for distribution network for augmentation of Ondal (Phase-II/B) piped Water Supply Scheme including FHTC & allied works within Ondal Block under RCFA Div-I, PHE Dte.(Part-3) ORD/000600/2022-2023 15/RCDI 05/01/2023 30 DAS & CHAKRABORTY 178.26 60.64 85
625 RCFA Division -I Acceptance cum work order for Laying & Pushing by adopting trench less technology (e.g. Jack Pushing Method etc0 at Bagdiha to Sidhapur Road and Bagdiha OHR to Bahadurpur under Jamuria Block under Augmentation of Bagdiha PWSS under RCFA Division-I PHE Dte. ORD/000600/2023-2024 3282/RCD-I 08/11/2023 15 SIMA ENTERPRISE 6.34 6.02 100
626 RCFA Division -I Providing FHTC through retrofitting at Chelod village area (Part-A) of Chelod mouza, GP Ratibati, Block-Raniganj of Ratibati Water Supply Scheme under RCFA Division-I PHE Dte. (Sl No. 15) ORD/000601/2021-2022 278/RCD-I 01/02/2022 30 M/S MONDAL CONSTRUCTION 4.84 4.55 0
627 RCFA Division -I Formal work order of laying of 200 mm dia HDPE pipe line from Semalya to kendra Khottamdihi intake pump house site under Kendra Khottamdihi Water Supply Scheme under RCFA Div-I, PHE Dte. ORD/000601/2022-2023 14/RCDI 05/01/2023 452 UMA ENTERPRISE 157.45 156.69 100
628 RCFA Division -I Acceptance cum work order for Construction of Guard Wall arrangement to project 450 mm dia the Rising Main at Jagrdih, Gopal area ASTA Water Supply Scheme under RCFA Division-I PHE Dte. ORD/000601/2023-2024 3283/RCD-I 08/11/2023 15 SIMA ENTERPRISE 6.12 6.11 100
629 RCFA Division -I Laying of Different dia UPVC /PVC pipeline for extention of distribution system regarding FHTC work at Saora Mouza of Ratibati Water supply Scheme under RCFA Div-I PHE Dte. (Sl No 17) ORD/000602/2021-2022 280/RCD-I 01/02/2022 30 A. CONSTRUCTION CO. 4.81 4.81 0
630 RCFA Division -I Formal work order for laying of distribution system to accommodate FHTC and providing FHTC including supplying, laying, fitting, fixing of 15 mm NB PVC (schedule 80)/20 mm OD HDPE (PE100,PN6) pipe with all necessary specials, saddle piece etc. all complete at Egara, Amkula and part of Nimcha Mouza Part-B) for Augmnentation of Sub-Surface Water Based Piped Water Supply Scheme for Amritnagar Zone-I under RCFA Division I, PHE Dte.under RCFA Division I,PHE Dte. ORD/000603/2022-2023 37/RCD I 11/01/2023 760 TARAPRASAD SARKAR 164.70 87.82 50
631 RCFA Division -I Formal work order for Distribution Network for RCFA Part-II Piped Water Supply Scheme including FHTC & allied work under RCFA Division-I PHE Dte. (Zone-14C) ORD/000604/2022-2023 38/RCD-I 11/01/2023 90 PRADIP KUMAR DEB 378.29 291.68 100
632 RCFA Division -I Continuation work order for Laying 450 mm dia MS water pipe line with 700 mm dia MS casing pipe for Railway crossing in Salanpur at KM SLS/1136 and SLS/1138 on Bemjomary siding Railway line in Asansol Division under JJM under RCFA Division-I PHE Dte. ORD/000604/2023-2024 3297/RCD-I 10/11/2023 15 MD AAMIR KHAN 24.44 23.98 100
633 RCFA Division -I Formal work order for laying of distribution system to accommodate FHTC and proving FHTC including supplying, laying,fitting, fixing of 15 mm NB PVC (schedule 80)/20 mm OD HDPE (PE100,PN6) pipe wth all necessary specials, saddle piece etc all complete at Murgasole mouza for augmentation of Sub surface Water Based Piped Water Supply Scheme for Amritnagar Zone-I under RCFA Div-I, PHE Dte. under RCFA Div-I, PHE Dte. ORD/000605/2022-2023 35/RCD I 11/01/2023 90 DAS & CHAKRABORTY 113.18 45.55 0
634 RCFA Division -I Providing FHTC through retrofitting at Chelod village area (Part-B) of Chelod mouza, GP Ratibati, Block-Raniganj of Ratibati Water Supply Scheme under RCFA Division-I PHE Dte. (Sl No. 16) ORD/000606/2021-2022 279/RCD-I 01/02/2022 30 M/S U.G. ENTERPRISE 4.84 4.84 100
635 RCFA Division -I Providing FHTC through retrofitting under Augmentation of Jamgram PWSS (Part-III) under RCFA Div-I, PHE Dte. ORD/000606/2022-2023 3274/RCDI 20/12/2022 623 M/S S.K. ENTERPRISE 22.96 20.69 50
636 RCFA Division -I Extension of UPVC Pipe line at Uttarrampur and Part of Kalisanko including connection to different ICDS & FP Schools for providing FHTC under Chotkara Kanskuli Water Supply Scheme under RCFA Division-I PHE Dte. (Sl no 01) ORD/000607/2021-2022 630/ RCD I 09/03/2022 15 KHEPI MAA TRADERS 4.18 2.74 0
637 RCFA Division -I Supplying, aligning and laying of HDPE pipe line for byepass water supply arrangement to Chapui village under Ratibati Water Supply Scheme under RCFA Division-I PHE Dte. (Part-A)(Sl no 02) ORD/000608/2021-2022 631/RCD-1 09/03/2022 15 SWATI CORPORATION 4.75 4.75 0
638 RCFA Division -I Acceptance cum work order for Emergency work for Withdrawing and Relaying of collecting main and other allied works at Damalia H/W under RCFA part II at Damodar river under Amritnagar water supply scheme under RCFA Division -I PHE Dte. ORD/000608/2023-2024 3368/RCD-1 21/11/2023 15 M/S KALYAN ENTERPRISE 2.78 2.78 100
639 RCFA Division -I Emergency supplying. Aligning and laying of HDPE pipe line for bypass water supply arrangement to Chapui village under Ratibati water supply scheme under RCFA Division-I PHE Dte. (Part-B)(Sl no 3) ORD/000609/2021-2022 632/RCD 1 09/03/2022 15 SWATI CORPORATION 4.76 4.72 0
640 RCFA Division -I Acceptance cum work order for Repairing and providing FHTC painting of H/W site for Dhandardihi Piped water supply Scheme Block-Andal, Dist-Paschim Bardhaman under RCFA Div-I, PHE Dte. ORD/000609/2023-2024 3369/RCD-1 21/11/2023 15 MD. JAWED KHAN 3.12 2.97 100
641 RCFA Division -I Emergency supplying. Aligning and laying of HDPE pipe line for bypass water supply arrangement to Chapui village under Ratibati water supply scheme under RCFA Division-I PHE Dte. (Part-C)(Sl no 04) ORD/000610/2021-2022 633/RCD 1 09/03/2022 15 SWATI CORPORATION 4.84 4.82 0
642 RCFA Division -I Acceptance cum work order for 2 nos Emergency repairing work of 450mm dia rising main at Basu Vata and Jamdoba under RCFA Part-II water supply scheme under RCFA Div-I, PHE Dte ORD/000610/2023-2024 3376/RCD-I 21/11/2023 15 KHEPI MAA TRADERS 2.16 2.16 100
643 RCFA Division -I Acceptance cum work order for Repairing of damaged collecting main in river Damodar rising main to D.P Colony OHR and allied works of DP colony W/S scheme under RCFA Division -I PHE Dte. ORD/000611/2023-2024 3370/RCD-1 21/11/2023 15 DURGA DAS MONDAL 4.98 4.42 100
644 RCFA Division -I Repalcing of old and damaged C.I. spiral stairs and other allied minor repairing works at Panchgachia OHR (Capacity 55000 gallon staging height 10 mtr under RCFA Part-I W/S Scheme under RCFA Division-I PHE Dte.(Sl no 06) ORD/000612/2021-2022 635/RCD 1 09/03/2022 15 RUBY CONSTRUCTION 3.87 3.83 0
645 RCFA Division -I Acceptance cum work order for Construction of Guard Wall arrangement to project 450 mm dia the Rising Main at Bidyanandapur of ASTA Water Supply Scheme under RCFA Division-I PHE Dte. ORD/000612/2023-2024 3377/RCD-I 21/11/2023 15 SIMA ENTERPRISE 4.03 2.23 100
646 RCFA Division -I Supplying, aligning and laying of HDPE line (parallel to main distribution) at Ghidoba, Kushum Danali and extension of pipe line at Ghiadoba village for providing FHTC under Chotkara Kanskuli water supply scheme under RCFA Division-I PHE Dte.(Sl no 07) ORD/000613/2021-2022 636/RCD 1 09/03/2022 15 DAS & CHAKRABORTY 3.01 2.45 0
647 RCFA Division -I Acceptance cum work order for laying of 150 mm and 200 mm dia rising main for the proposed augmentation work of Churulia and its adjoining mouzas piped water supply scheme under RCFA Div-I, PHE Dte ORD/000613/2022-2023 3273/RCD I 20/12/2022 621 T.R. ENTERPRISE 21.17 10.65 70
648 RCFA Division -I Acceptance work order for sinking of 6 nos river bed 200 dia tube well including laying of collecting main for augmentation of sub surface water based piped water supply scheme for Amritnagar Zone-I within RCFA Part-II area under RCFA Div-I, PHE Dte. ORD/000614/2022-2023 3272/RCDI 20/12/2022 30 M/S MONDAL CONSTRUCTION 13.37 13.37 100
649 RCFA Division -I Supplying, aligning and laying of UPVC line (parallel to main distribution) at Malladihi Hospital para towards Chayanpur for providing FHTC work under Chotkara Kanskuli water supply scheme under RCFA Division-I PHE Dte. (Sl no 09) ORD/000615/2021-2022 638/RCD 1 09/03/2022 15 MD AAMIR KHAN 2.82 0.00 0
650 RCFA Division -I Acceptance cum work order for Construction of Switch Room (5.4 m x 3.6 m) at Shibpur of Augmentation of Telipara PWSS under RCFA Division-I PHE Dte. ORD/000615/2025-2026 2011/RCD-I 11/07/2025 90 MOUMITA ENTERPRISE 6.73 0.00 0
651 RCFA Division -I Acceptance cum work order for Urgent basis repairing work of D P Colony (OHR) at D P Colony W/S Scheme under RCFA Division-I PHE Dte. ORD/000618/2021-2022 712/RCD-I 24/03/2022 30 RUBY CONSTRUCTION 15.72 15.13 0
652 RCFA Division -I Formal work order for construction of 350 cum capacity 20 mtr staging height RCC over Head Reservoir (Piped connection and cost of pipes, specials at Gourandi H/W site for Augmentation of Panuria Piped Water Supply Scheme under RCFA Div-I, PHE dte in the District of Pachim Bardhaman. ORD/000618/2022-2023 102/RCD I 20/01/2023 212 A. CONSTRUCTION CO. 115.99 115.99 100
653 RCFA Division -I Acceptance cum work order for Emergency repairing of damaged collecting main in river Damodar and allied works at Surjanagar H/W site of Surjanagar W/S Scheme under RCFA Division -I PHE Dte. ORD/000620/2023-2024 3383/RCD-I 21/11/2023 15 MD. JAWED KHAN 4.27 4.27 100
654 RCFA Division -I Acceptance cum work order for Repairing of UPVC pipe line supply fitting and fixing of valves and allied works under Dhandardihi water supply scheme under RCFA Division -I PHE Dte ORD/000622/2023-2024 3375/RCD-I 21/11/2023 15 MD. JAWED KHAN 3.61 3.55 100
655 RCFA Division -I Acceptance cum work order for Construction of Guard Room, extension of Boundary Wall, Land Development, approached road and allied works under Augmentation of RCFA Part-II (Zone-17) Piped Water Supply Scheme under RCFA Division-I PHE Dte. ORD/000626/2023-2024 3416/RCD-1 24/11/2023 60 DIP CONSTRUCTION 25.93 25.88 100
656 RCFA Division -I Formal work order for distribution network for RCFA Part-II piped Water Supply Scheme including FHTC & allied work under RCFA Div-I, PHE Dte. (Zone-9B)(Part-A) ORD/000630/2022-2023 486/RCDI 03/02/2023 30 M/S MONDAL ENTERPRISE 156.13 71.14 70
657 RCFA Division -I Formal Work Order for Distribution network for RCFA Part-II piped Water Supply Scheme including FHTC & allied work under RCFA Div-I, PHE Dte.(Zone-12B)(Segment-2). ORD/000631/2022-2023 485/RCDI 03/02/2023 60 M/S SINGH & KONAR CONSTRUCTION 155.21 92.00 80
658 RCFA Division -I Acceptance cum work order for Construction of Separate Zone at Keshabpur with Boundary wall, Pump House, Tubewell & other allied works of Augmentation of Bistupur PWSS under RCFA Division-I PHE Dte. ORD/000632/2024-2025 318/RCD-I 12/02/2025 262 MRITYUNJOY MUKHERJEE & CO. 22.90 0.00 80
659 RCFA Division -I Acceptance cum work order for laying of different dia distribution pipe line and allied works etc at Bisseswari Muslimpara and adjacent area of Khandra area under Improvement of RCFA Part-II Water Supply Scheme under RCFA Division-I PHE Dte. ORD/000636/2022-2023 334/RCD I 30/01/2023 15 M/S B.K. CONSTRUCTION 7.68 7.58 100
660 RCFA Division -I Acceptance cum work order for Supplying aligning, Laying of PVC pipe, HDPE pipe sluice valve, Sluice valve chamber and other allied works at Oriapara, Chapui Vaskadaora 7 nos pit to Rangadanga Talbagan under Ratibati Gram Panchayet under RCFA Part-II W/S Scheme under RCFA Division-I PHE Dte. ORD/000637/2023-2024 3419/RCD-1 24/11/2023 30 M/S KALYAN ENTERPRISE 7.78 7.78 100
661 RCFA Division -I Acceptance cum work order for Withdrawing, supplying, aligning Relaying of 80 mm dia PVC pipe line, repairing of street stand post and other allied works at Goylapara under Tirat Gram Panchyat under RCFA Part-II W/S Scheme under RCFA Division-I PHE Dte. ORD/000639/2023-2024 3420/RCD-1 24/11/2023 30 M/S KALYAN ENTERPRISE 6.24 0.00 100
662 RCFA Division -I Acceptance work order for Laying & Pushing of 800 mm dia RCC (NP3) Hume pipe by adopting trench less technology (e.g. Jack Pushing Method etc) of water pipe lines including supplying and laying of 450 mm dia MS pipe line at Mohismura More on NH Madhaichak Road in connection to rising main (Part-B) under Improvement of RCFA Part-I PWSS under RCFA Division-I PHE Dte. ORD/000643/2022-2023 341/RCD I 30/01/2023 15 M/S MONDAL ENTERPRISE 8.69 8.51 0
663 RCFA Division -I Acceptance work order for Construction of Chlorine Room of Size (4.50 x 3.50 m) at Churulia for Augmentation of Madantore Piped Water Supply Scheme under RCFA Division-I PHE Dte. in the District Paschim Bardhaman ORD/000644/2022-2023 342/RCDI 30/01/2023 15 ANAMIKA CONSTRUCTION 4.60 4.42 100
664 RCFA Division -I Acceptance cum work order for laying of 200 mm dia rising main from Dignala OHR ste to proposed OHR site at Andal BL & LRO office for the proposed Augmentation work of Andal Phase-II/B Piped Water Supply Scheme under RCFA Division-I PHE Dte. ORD/000645/2022-2023 343/RCDI 30/01/2023 822 D.S.C. CONCERN 7.65 4.30 65
665 RCFA Division -I Acceptance cum work order for Sinking of 3 (Three) nos 200 mm dia river bed tube well including collecting main in the river of Damodar at D.P Colony H/W Site for D P Colony Water Supply Scheme under RCFA Division-I PHE Dte. ORD/000645/2023-2024 3423/RCD-1 24/11/2023 15 DURGA DAS MONDAL 9.53 9.49 100
666 RCFA Division -I Acceptance cum work order for laying of HDPE Pipe line from Panuria Bazar to Shirikhad Para under Jamgram Panuria W/S Scheme under RCFA Division-I PHE Dte. ORD/000646/2022-2023 344/RCD I 30/01/2023 15 SHREE DURGA ENTERPRISE 1.35 1.34 0
667 RCFA Division -I Acceptance cum work order for Additional supplying, aligning, laying HDPE & PVC pipe line, construction of sluice valve chamber and other allied works under Tirat Mouza (Taldanga, Pathan Dhaora & Shyamdanga) W/S Scheme under RCFA Division-I PHE Dte. ORD/000648/2023-2024 3425/RCD-1 24/11/2023 30 RUBY CONSTRUCTION 6.78 6.65 100
668 RCFA Division -I Acceptance cum work order for Supplying E.R.M.S. Black pipe of approved quality including carring, stacking at works for crossing of 12 nos culvert/cannel of by the side of PWD road under Improvement RCFA Part-I Water Supply Scheme within command area of Zone-VIII under RCFA Division-I PHE Dte. ORD/000651/2023-2024 3426/RCD-1 24/11/2023 20 SWATI CORPORATION 7.09 4.21 100
669 RCFA Division -I Acceptance cum work order for Repairing and restoration of concrete road due to FHTC work at Bolkunda and surrounding villages within Filberia-Bolkunda Gram Panchayat under Improvement of RCFA Part-I water Supply scheme under RCFA Division-I PHE Dte ORD/000652/2023-2024 3449/RCD-I 24/11/2023 15 RELIABLE ENGINEERS CO-OP CONSTRUCTION SOCIETY LTD. 3.52 3.50 100
670 RCFA Division -I Acceptance cum work order for Repairing and restoration of concrete road due to FHTC work at Samdi and surrounding villages within Samdi Gram Panchayat under Improvement of RCFA Part-I water Supply scheme under RCFA Division-I PHE Dte. ORD/000653/2023-2024 3450/RCD-I 24/11/2023 15 RELIABLE ENGINEERS CO-OP CONSTRUCTION SOCIETY LTD. 3.39 3.35 100
671 RCFA Division -I Acceptance cum work order for Repairing and restoration of concrete road due to FHTC work at Jitpur Uttarrampur and surrounding villages within Jitpur Uttarrampur Gram Panchayat under Improvement of RCFA Part-I water Supply scheme under RCFA Division-I PHE Dte. ORD/000654/2023-2024 3451/RCD-I 24/11/2023 15 DIP ENTERPRISE 4.49 4.38 100
672 RCFA Division -I Acceptance cum work order for construction of Chlorine Room of Size (4.50 x 3.50 m) at (Zone-VII) of Salanpur Block for Improvement of RCFA Part-I Piped Water Supply Scheme under RCFA Division-I PHE Dte. in the District Paschim Bardhaman ORD/000657/2022-2023 356/RCDI 30/01/2023 15 DAS & SARKAR ENTERPRISE 4.60 3.78 100
673 RCFA Division -I Acceptance cum work order for construction of Chlorine Room of Size (4.50 x 3.50 m) at (Zone-VI) of Salanpur Block for Improvement of RCFA Part-I Piped Water Supply Scheme under RCFA Division-I PHE Dte. in the District Paschim Bardhaman ORD/000658/2022-2023 357/RCDI 30/01/2023 15 DAS & SARKAR ENTERPRISE 4.60 3.75 100
674 RCFA Division -I Acceptance cum work order for Repairing and restoration of concrete road due to FHTC work at Kallya and surrounding villages within Kallya Gram Panchayat under Improvement of RCFA Part-I water Supply scheme under RCFA Division-I PHE Dte. ORD/000658/2023-2024 3452/RCD-I 24/11/2023 15 JAI MAHARAJ ENTERPRISE 3.71 3.69 100
675 RCFA Division -I Acceptance cum work order for Additional work supplying, laying and pushing of 600 mm dia MS cashing pipe for Railway crossing by Jack Pushing method with 150 mm dia MS water carrier pipe in Rupnarayanpur in between 232/16-18 (SLS-RNPR) in Asansol Division under distribution network Improvement RCFA Part-I Water Supply Scheme within command area of Zone-VII (Part-E) under RCFA Division-I PHE Dte. ORD/000659/2023-2024 3430/RCD-1 24/11/2023 45 TARA CONSTRUCTION 55.01 50.99 100
676 RCFA Division -I Acceptance cum work order for Balance work for laying of HDPE pipeline and PVC pipeline and allied works at Nabagram, Ukhra (Sansad-VI) Chatterjee para and Bahula Colony under RCFA Part-II Water Supply Scheme under RCFA Division-I PHE Dte. ORD/000660/2023-2024 3453/RCD-I 24/11/2023 15 MD AAMIR KHAN 4.36 4.24 100
677 RCFA Division -I Acceptance cum work order for Laying of 110 mm dia and 90 mm dia HDPE pipe line including chokage cleaning and other allied works of Ukhra Water Supply Scheme under RCFA Division-I PHE Dte. (Part-A) ORD/000663/2023-2024 3432/RCD-1 24/11/2023 30 JAI MAHARAJ ENTERPRISE 6.86 6.86 100
678 RCFA Division -I Acceptance cum work order for Trial Run for Barabani Kashidanga under Improvement of RCFA Part-I (Zone-XI) Piped W/S Scheme under RCFA Division-I PHE Dte. (180 days) ORD/000665/2023-2024 3455/RCD-I 24/11/2023 180 UNITED CONSTRUCTION 1.08 0.00 0
679 RCFA Division -I Acceptance cum work order for Allied work of Distribution Network including FHTC & allied work at Ondal Block of RCFA Part-II (Zone-12 A) Piped Water Scheme under RCFA Division-I PHE Dte. ORD/000669/2023-2024 3436/RCD-1 24/11/2023 60 MRITYUNJOY MUKHERJEE & CO. 81.28 48.77 65
680 RCFA Division -I Acceptance cum work order for Laying & pushing of 600 mm dia RCC (NP3) Hume pipe by adopting trench less technology (e.g. Jack Pushing Method etc) at Srirampur Workshop road near Railway Workshop under Ondal Block under RCFA Division-I PHE Dte. ORD/000670/2023-2024 3437/RCD-1 24/11/2023 15 M/S UNIT CONSTRUCTION 9.31 9.31 100
681 RCFA Division -I Acceptance cum work order for Additional work for laying MS pipe and allied works including adopting trench less technology (e.g. Jack Pushing Method etc) at Amnala irrigation Damp within command area of Zone-IX Part-I distribution system under Improvement of RCFA Part-I PWSS under RCFA Division-I PHE Dte. ORD/000672/2023-2024 3439/RCD-1 24/11/2023 15 KHEPI MAA TRADERS 22.98 22.91 100
682 RCFA Division -I Acceptance Cum work order for Additional work for distribution network for Improvement of RCFA Part-II Water Supply Scheme within command area of Zone-VII under RCFA Division-I PHE Dte. (Part-B) ORD/000675/2022-2023 358/RCD I 30/01/2023 336 UNITED CONSTRUCTION 62.01 30.93 100
683 RCFA Division -I Acceptance cum work order for Laying & Pushing of 800 mm dia RCC (NP3) Hume Pipe by adopting trench less technology (e.g. Jack Pushing Method etc) of Water Pipe Lines including supplying and laying of 450 mm dia MS Pipe Line at Hunuman Mandir on Mohismura Ethora Road near Ethora OHR inconnection to rising main (Part-B) under Augmentation of RCFA Part-I PWSS under RCFA Division-I PHE Dte. ORD/000676/2022-2023 360/RCD I 30/01/2023 15 M/S MONDAL ENTERPRISE 11.17 11.09 0
684 RCFA Division -I Acceptance cum work order for Additional work for laying distribution main over concrete pillar including supply of rubber gusket within Zone-XI Part-I under Improvement of RCFA Part-I Water Supply Scheme under RCFA Division-I PHE Dte. ORD/000676/2023-2024 3475/RCD-I 28/11/2023 15 R B ENTERPRISE 4.89 1.86 100
685 RCFA Division -I Acceptance cum work order for Providing FHTC through Retrofitting at Pathakpara Block Anda & Pandabeswar of Ukhra under Augmentation of RCFA Part-II (Zone-2) PWSS under RCFA Division-I PHE Dte. (Part-C) ORD/000680/2022-2023 367/RCDI 30/01/2023 30 JAI MAHARAJ ENTERPRISE 5.62 5.20 100
686 RCFA Division -I Acceptance cum work order for Different dia HDPE pipe line including extra cutting Laterate /sandstone and concrete cutting of distribution of pipe line Zone-I (Part-B) at Improvement of RCFA Part-I Water Supply Scheme under RCFA Division-I PHE Dte. ORD/000682/2022-2023 370/RCD I 30/01/2023 15 SWATI CORPORATION 25.76 11.14 95
687 RCFA Division -I Acceptance cum work order for Additional work for laying and distribution system for Improvement of RCFA Part-I Water Supply Scheme under Command area of Zone-VII under RCFA Division-I PHE Dte. ORD/000683/2023-2024 3472/RCD-I 28/11/2023 30 GITA CONSTRUCTION 95.09 70.58 100
688 RCFA Division -I Acceptance cum work order for Laying of different dia HDPE pipe line towards Bisserari, Anandapally and etc. adjacent area under Khandra area Block Andal & Pandabeswar of Improvement of RCFA Part-II Water Supply scheme under RCFA Division-I PHE Dte. ORD/000684/2022-2023 372/RCD I 30/01/2023 15 M/S B.K. CONSTRUCTION 6.87 6.83 100
689 RCFA Division -I Acceptance cum work order for Laying of different dia HDPE pipe line (left out portion) including adopting trench less technologies and other allied works at Moul Danga village under Barabani Block of Improvement of RCFA Part-I PWSS under RCFA Division-I PHE Dte. ORD/000685/2023-2024 3284/RCD-1 08/11/2023 30 SRI KRISHNA ENTERPRISE 19.21 16.46 100
690 RCFA Division -I Acceptance cum work order for Additional extra cutting Laterate/sandstone of distribution of pipe line at Improvement of RCFA Part-I W/S Scheme within command area of Zone-VIII under RCFA Division-I PHE Dte. ORD/000686/2022-2023 374/RCD I 30/01/2023 15 SWATI CORPORATION 3.75 3.69 0
691 RCFA Division -I Acceptance cum work order for Additional extra cutting Laterate/sandstone of distribution of pipe line at Improvement of RCFA Part-I W/S Scheme within command area of Zone-VIII under RCFA Division-I PHE Dte. ORD/000687/2022-2023 375/RCD I 30/01/2023 15 SWATI CORPORATION 3.12 3.07 0
692 RCFA Division -I Acceptance cum work order for Laying of different dia HDPE Pipe Line including concrete cutting, mending etc allied works towards Pathakpara (Sansad-XV) Block Andal & Pandabeswar of Ukhra under Additional works under Ukhra & its adjoining mouzas water supply scheme under RCFA Division-I PHE Dte. ORD/000693/2022-2023 382/RCD I 30/01/2023 15 B.T.M CONCERN 20.71 20.34 100
693 RCFA Division -I Acceptance cum work order for Construction of Pump House at Dendua for Improvement of RCFA Part-I Piped Water Supply Scheme under RCFA Division-I PHE Dte. ORD/000696/2022-2023 487/RCDI 03/02/2023 90 D.S. ENTERPRISE 30.30 23.52 77
694 RCFA Division -I Acceptance cum work order for Supply and delivery of Centrifugal Pump Motor Set for Nimsha Village (High Lift) at Shemalya under AUGMENTATION PWSS OF RCFA PART-II (ZONE-13) Block - Jamuria, Dist - Paschim Bardhaman ORD/000699/2023-2024 3502/RCD-1 30/11/2023 10 M/S SWAPAN BANERJEE 21.05 21.05 100
695 RCFA Division -I Acceptance cum work order for Supply and delivery of CI sluice valve and C.I/D.I specials under improvement of RCFA part-I piped water supply scheme under RCFA div-I, PHE Dte. ORD/000701/2022-2023 613/RCD I 23/02/2023 10 MAKALI ENGINEERING CORPORATION 28.49 28.49 0
696 RCFA Division -I Acceptance cum work order for Additional works of Dismantling & concrete works, Supplying, Aligning & Laying HDPE Pipe and other allied works at distribution system Network for Shyamlya in Chatrisganda Mouza under Shyamlya Gram Panchayat under Jamuria Block under RCFA Division-I PHE Dte. (Part-B) ORD/000701/2023-2024 3499/RCD-1 30/11/2023 30 DAWN CONSTRUCTION 45.48 45.02 100
697 RCFA Division -I Acceptance cum work order for Construction of CWR (Clear Water Reservoir) of capacity 150 cum & allied works at Churulia under Augmentation of Churulia Piped Water Supply Scheme under RCFA Division-I PHE Dte. ORD/000705/2023-2024 3501/RCD-1 30/11/2023 90 SIMA ENTERPRISE 23.68 22.16 100
698 RCFA Division -I Acceptance cum work order for Sinking of 03 (Three) nos. 200 mm dia river bed tube well including laying of 250 mm dia HDPE pipe line in the river of Ajoy for Ukhra Piped Water Supply Scheme under RCFA Division-I PHE Dte. ORD/000717/2023-2024 3546/RCD-1 07/12/2023 30 B.T.M. CONCERN 21.19 1.96 10
699 RCFA Division -I Block Level Orientation Programme involving PRI functionaries on Jal Jeevan Mission and its components at Barabani, Salanpur, Jamuria, Pandabeswar, Raniganj, Andal, Kansha & Durgapur Faridpur Block in the Districts of Paschim Bardhaman under RCFA Division-I PHE Dte. ORD/000718/2023-2024 Camp_02_8_Nos_Block_AE_II 26/09/2023 30 MUKHERJEE TRADERS 3.79 3.79 100
700 RCFA Division -I Acceptance cum work order for Supplying E.R.M.S Black pipe of approved quality including carring, stacking at works site and other allied works for crossing of 07 nos (Node Point :139-140,153-3,42-43,86-87,60-61, and 38-40 culvert/canal of by the side of PWD road under Improvement RCFA Part-I water Supply scheme within command area of Zone VIII under RCFA Div-I PHE Dte. ORD/000720/2023-2024 3614/RCD-I 20/12/2023 15 TARA CONSTRUCTION 3.32 0.00 0
701 RCFA Division -I Acceptance cum work order for Renovation work at Kalyaneswari Inspection Bungalow & WTP under RCFA Part-I W/S Scheme under RCFA Division-I PHE Dte. ORD/000721/2023-2024 3610/RCD-1 20/12/2023 540 M/S KALYANI ENTERPRISE 81.82 7.51 100
702 RCFA Division -I Acceptance cum work order for Emergency repairing of 50 sqmm x 4 core Al Armoured damaged cable line and other allied Electrical works at Executive Engineer office building, SE office building, rest room & B type quarter under RCFA Division-I PHE Dte. ORD/000722/2023-2024 3573_RCD/1 12/12/2023 15 T R ENTERPRISE 6.82 6.80 100
703 RCFA Division -I Acceptance cum work order for Additional Supplying E.R.M.S Black pipe of approved quality including carring, stacking at works site and other allied works for Improvement RCFA Part-I Water Supply Scheme within command area of Zone VIII under RCFA Div-I PHE Dte. ORD/000723/2023-2024 3612/RCD-1 20/12/2023 15 SWATI CORPORATION 2.78 0.00 0
704 RCFA Division -I Acceptance cum work order for Construction of Pump Houses (Size 14 mtr x 10 mtr x 8 mtr) under at Madanpur H/W Site under AUGMENTATION PWSS OF RCFA PART-II (ZONE-8) under RCFA Division-I PHE Dte. ORD/000724/2023-2024 3611/RCD-1 20/12/2023 567 D.S.C. CONCERN 35.91 16.60 50
705 RCFA Division -I Hiring of Maxi Cab (Non Air Conditional ) Bharat Stage-iii/BS-ii purchased on or after 01.05.2008 with Diesel /LPG /CNG Engine for the supervision work of Durgapur W/S Division for office use of Assitant Engineer, RCFA Division-I Public Helth Engineering Directorate, Govt of West Bengal ( w.e.f 01.12.2023. to 31.05.2024) Consumption of Diesel,12 km per litre, Mobil 05 litre per 2500 km. ORD/000727/2023-2024 3514/RCD-I 30/11/2023 182 SUBHA TOUR & TRAVELS 0.89 2.39 35
706 RCFA Division -I Emergency repairing work 750 mm dia Rising main at Kalyaneswari Dendua road under RCFA Part-I W/S Scheme under RCFA Division-I PHE Dte. ORD/000736/2023-2024 Camp_02_Kalyaneswari_AE_I 06/10/2023 15 MD AAMIR KHAN 2.75 2.67 100
707 RCFA Division -I Accepatance cum work order for construction of chlorine room of size (4.50 X 3.50m) at (Zone-IX) of Baraboni Block for Improvement of RCFA Part-I piped water supply scheme under RCFA Div-I, PHE Dte., in the District Paschim Bardhaman. ORD/000737/2022-2023 676/RCDI 24/02/2023 15 ZEROTH CONTROL SYSTEM 4.61 2.91 100
708 RCFA Division -I Acceptance cum work order for construction of chlorine room of size (4.50 X 3.50 m) at (Zone-XIII) of Baraboni block for Improvement of RCFA Pt-I piped Water Supply under RCFA Div-I, PHE Dte. in the district of Paschim Bardhaman. ORD/000738/2022-2023 677/RCDI 24/02/2023 15 ZEROTH CONTROL SYSTEM 4.61 3.89 100
709 RCFA Division -I Additional extra cutting laterate/sandstone of distribution network for improvement of Part-I W/S Scheme within command area of Zone VII under RCFA Div-I, PHE Dte(Part-E) ORD/000747/2022-2023 695/RCD I 02/03/2023 7 TARA CONSTRUCTION 0.83 0.79 0
710 RCFA Division -I Acceptance cum work order for Construction of FHTC Platform in different household at Dakshin Khanda (Jl No. 36) Block ¿ Andal under Augmentation of RCFA Part-II (Zone-1A) PWSS under RCFA Division-I PHE Dte. ORD/000759/2022-2023 385/RCD I 30/01/2023 45 UNITED CONSTRUCTION 34.42 28.04 100
711 RCFA Division -I Acceptance cum work order for Sinking of 6 (Six) nos 200 mm dia river bed tube well in river Ajoy of Augmentation of Churulia PWSS under RCFA Division-I PHE Dte. ORD/000761/2022-2023 388/RCDI 30/01/2023 45 ASHA CONSTRUCTION 41.46 40.95 100
712 RCFA Division -I Acceptance cum work order for Supplying aligning and laying of HDPE Pipe line for restoration of pipe line towards MSPL at Kalyaneswari Dendua Road and supplying CI/DI specials in connection to aligning of rising main Part-A for Improvement of RCFA Part-I Water Supply Scheme under RCFA Division-I PHE Dte. ORD/000762/2022-2023 389/RCD I 30/01/2023 10 MD AAMIR KHAN 21.01 20.70 0
713 RCFA Division -I Acceptance cum work order for Emergency repairing and maintenance work of damaged RCC Elevated Reservoir including of capacity 700cum at Ramprasadpur of Augmentation of Ondal Phase-I W/S Scheme under RCFA Division-I PHE Dte. ORD/000763/2022-2023 390/RCD I 30/01/2023 60 SHILPA UDDOYG ENGINEERING CO-OP SOCIETY LTD. 12.78 12.62 100
714 RCFA Division -I Acceptance cum work order for Construction work of Damaged RCC Elevated Reservoir including dismantling and reconstruction of Top dome of capacity 1135 cum of Sankarpur OHR under RCFA Part-II W/S Scheme under RCFA Division-I PHE Dte. ORD/000764/2022-2023 391/RCDI 30/01/2023 90 RANJIB GHATAK 33.55 26.45 80
715 RCFA Division -I Acceptance cum work order for Bye pass connection including supplying, aligning, laying of HDPE pipe and other allied works at Bagdiha Head Works Site to Bagdiha Siddapur High School under Bagdiha W/S Scheme under RCFA Division-I PHE Dte. ORD/000767/2022-2023 393/RCDI 30/01/2023 30 BABA LOKNATH ENTERPRISE 30.27 17.57 100
716 RCFA Division -I Acceptance cum work order for Laying of different dia MS & HDPE Pipe line and mending works at Chanchani (Sansad-XII) of Ukhra area under Ukhra Water Supply Scheme under RCFA Division-I PHE Dte. (Part-D) ORD/000771/2022-2023 397/RCDI 30/01/2023 30 M/S B.K. CONSTRUCTION 11.94 10.71 100
717 RCFA Division -I Acceptance cum work order for Interconnection work including Augurboring, supply of value, construction of valve, construction of valve chamber within command under Dabor OHR under Retrofitting of 4 Nos. PWSS for providing FHTC under RCFA Division-I PHE Dte (sl. no-6). ORD/000772/2022-2023 804/RCD-I 06/03/2023 10 RELIABLE ENGINEERS CO-OP CONSTRUCTION SOCIETY LTD. 12.51 12.28 0
718 RCFA Division -I Acceptance cum Work Order for Rising Main of Augmentation of Jamuria Rural (Zone-I & II) under RCFA Division-I PHE Dte (sl.no-14) ORD/000773/2022-2023 805/RCD-I 06/03/2023 60 M/S MONDAL ENTERPRISE 22.77 8.18 40
719 RCFA Division -I Acceptance cum Providing FHTC of retrofitting at Kumardihi village (left out portion) of kumardihi Mouza, GP Ratibati, Block-Raniganj of Ratibati Water Supply Sceme under RCFA Division -I PHE Dte. ORD/000775/2022-2023 806/RCD-I 06/03/2023 20 M/S MONDAL CONSTRUCTION 13.78 12.41 100
720 RCFA Division -I Acceptance cum work order for Repairing and renovation of Panchagachia OHR of Capacity 1000 cum staging height 15 mtr under Improvement of RCFA Part-I Water Supply Scheme under RCFA Division-I PHE Dte. ORD/000777/2022-2023 399/RCD I 30/01/2023 90 RUBY CONSTRUCTION 20.33 11.62 100
721 RCFA Division -I Formal order for distribution network for augmentation of Ondal (Phase -II/B) piped Water Supply scheme including FHTC & allied work within ondal block under RCFA Div-I, PHE Dte. ORD/000780/2022-2023 819/RCDI 10/03/2023 30 M/S MONI TRADERS 108.27 34.49 60
722 RCFA Division -I Formal work order for distribution network for RCFA Part-II piped water supply Scheme including FHTC & allied work under RCFA Div-I, PHE Dte (Zone-1A) (Ukhra) ORD/000781/2022-2023 818/RCDI 10/03/2023 905 ASHA CONSTRUCTION 249.09 53.60 70
723 RCFA Division -I Formal work order for distribution network for augmentation of Jamuria (Rural)(Zone-I) pipe water Supply Scheme including FHTC allied work wthin Jamuria Block under RCFA Div-I PHE Dte.(Part-B) ORD/000782/2022-2023 813/RCD I 10/03/2023 30 DIP CONSTRUCTION 151.47 43.68 20
724 RCFA Division -I Acceptance cum work order for supplying, aligning, laying of PVC & HDPE Pipeline, Construction of Sluice valve chamber and supplying, aligning, laying of G.I Pipe under Retrofitting of Madantore PWSS scheme under RCFA Division-I PHE Dte. ORD/000784/2022-2023 405/RCD-I 30/01/2023 15 M/S S.K. ENTERPRISE 5.17 5.17 0
725 RCFA Division -I Acceptance cum work order Sinking of 5 (Five nos. 200mm dia river bed tube wells including collecting main instead of defunct tube well at river Damodar (intake well Site ) Kalajharia Under Omprovement of RCFS part-II W/S Scheme under RCFA Division-I PHE Dte. (Part-G). ORD/000789/2022-2023 402/RCDI 30/01/2023 15 DURGADAS MONDAL 8.43 7.68 0
726 RCFA Division -I Acceptance cum work order for Laying & pushing of 600 mm dia RCC (NP3) Hume pipe by adopting trench less technology (e.g. Jack Pushing Method etc) at Srirampur Workshop road near Railway Workshop under Ondal Block under RCFA Division-I PHE Dte. ORD/000791/2023-2024 3437_RCD_I 24/11/2023 15 M/S UNIT CONSTRUCTION 9.31 0.00 0
727 RCFA Division -I Acceptance cum work order for supplying 90 mm dia HDPE pipe line at Murgathol Adibasipara and Old Egera Including repairing different dia pipe line in different places within Amritnagar Distribution Zone under Augmentation of Amritnagar Zone-II Piped Water Supply Scheme under RCFA Division- IPHE Dte. ORD/000792/2022-2023 410/RCD-I 30/01/2023 20 DAS & CHAKRABORTY 9.23 9.18 0
728 RCFA Division -I Acceptance cum work order for Supply fitting and allining of 250 mm dia non return valve and 80 mm dia air valve and etc allied works at Bilpahari OCP area on distribution main under Kendra Khottamdihi water supply scheme under RCFA Div-I, PHE Dte. ORD/000797/2023-2024 2896_RCD-I 06/10/2023 30 M/S UNIT CONSTRUCTION 2.42 0.00 0
729 RCFA Division -I Formal work order for distributionn network for RCFA Part-II piped Water Supply Including FHTC & allied works under RCFA Div-I, PHE Dte. (Zone-12B)(Segment-1) ORD/000805/2022-2023 931/RCDI 14/03/2023 60 ARISTOCON ENGINEER'S CO-OP. SOCIETY LTD. 157.79 128.25 82
730 RCFA Division -I Formal work order for distribution network including FHTC & allied work at Ondal Block of RCFA Part-II(zone -5) pipe water supply under RCFA Div-I, PHE Dte. ORD/000811/2022-2023 954/RCDI 20/03/2023 926 M/S PIONEER CONSTRUCTION 475.88 209.15 80
731 RCFA Division -I Formal work order for Constriction of OHR (Capacity 350 cum, staging Height 20 mtrs) for Augmentation of Jamuria Rural (Zone-I) Piped Water Supply Scheme under RCFA Division-I PHE Dte. Block Barabani, Dist- Paschim Bardhaman. (2nd Call) ORD/000814/2023-2024 95/RCD-1 08/01/2024 366 M/S SINGH & KONAR CONSTRUCTION 108.00 0.00 50
732 RCFA Division -I Formal work order for distribution network for RCFA Part-II Piped Water Supply Scheme including FHTC & allied work under RCFA Div-I, PHE Dte.(Zone-17) ORD/000815/2022-2023 997/RCDI 22/03/2023 855 TARA CONSTRUCTION 342.78 139.59 75
733 RCFA Division -I Formal work order for distribution network for RCFA Part-II Piped water Supply Scheme including FHTC & allied work under RCFA Div-I, PHE Dte.(Zone-18) ORD/000816/2022-2023 998/RCDI 22/03/2023 1016 SWATI CORPORATION 454.37 284.71 100
734 RCFA Division -I Acceptance cum work order for Operation and regulatiing of different dia S/V of Distribution system and rising main for FHTC work for Mdira, Dighalpahari, Chotkara and Kanskuli villages under administrative contingency of JJM under RCFA Division -I PHE Dte. ORD/000820/2023-2024 101/RCD-1 09/01/2024 239 SRI KRISHNA ENTERPRISE 2.91 0.00 100
735 RCFA Division -I Formal work order for distribution network for RCFA Part-II Piped water Supply Scheme including FHTC & allied works under RCFA Div-I, PHE Dte. (Zone-3)(Ukhra) ORD/000821/2022-2023 1002/RCDI 22/03/2023 120 SINGHA ROY & CO. 392.43 361.61 86
736 RCFA Division -I Continuation work order for Providing FHTC through Retrofitting at Bhaluka & Sonepur Bazari under Kendra Khottamdih Water Supply Scheme under RCFA Division-I PHE Dte. under JJM (RCFA Part-II) ORD/000825/2022-2023 801/RCD-I 06/03/2023 30 MACHINO TECHNO 67.77 65.09 100
737 RCFA Division -I Acceptance cum work order for laying of 200 mm dia rising main for Roshna OHR from Gourandi CWR under Augmentation of Roshna Piped water Supply Scheme under RCFA Div-I, PHE Dte. ORD/000830/2022-2023 1034/RCDI 23/03/2023 60 SRI KRISHNA ENTERPRISE 11.44 8.64 60
738 RCFA Division -I Acceptance cum work order for additional work for laying of distribution network for Improvement RCFA Part-I Piped Water Supply Scheme within command area of Zone-XI (Part-9 Distribution Segment) under RCFA Div-I, PHE Dte. ORD/000831/2022-2023 1035/RCDI 23/03/2023 376 SOMNATH SAMANTA 42.19 20.02 100
739 RCFA Division -I Acceptance cum work order for the additional work for the laying of different dia (315 mm , 280 mm, 225 mm ) dia HDPE pipe instead of different dia (300 mm , 250 mm, 200 mm) dia DJ pipe of distribution network for improvement RCA Part-I Water Supply Scheme within command area of Zone VI under RCFA Div-I, PHE Dte (Part-A) ORD/000832/2022-2023 1051/RCD I 23/03/2023 30 DIP CONSTRUCTION 98.08 89.82 100
740 RCFA Division -I Acceptance cum work order Laying & Pushing of 500 mm dia RCC (NP3) Hume pipe by adopting trench less technology (e.g. Jack Pushing Method etc) of water pipe lines including supplying and laying of 200 mm dia 250 mm dia MS pipe line at different location on Asansol Chittanrajan Road, Kalyaneswari Dendua road within command area of rising main (Part-A) under Improvement of RCFA Part-I PWSS under RCFA Division-I PHE Dte. ORD/000834/2022-2023 1060/RCD-I 23/03/2023 15 MAK CONSTRUCTION CO. 40.50 39.62 100
741 RCFA Division -I Acceptance cum work order Proposed Pump House including Toilet of Augmentation Panuria Piped Water Supply Scheme under RCFA Division-I PHE Dte. ORD/000836/2022-2023 1064/RCD-I 23/03/2023 180 RUBY CONSTRUCTION 31.13 31.12 100
742 RCFA Division -I Acceptance cum work order Pipe line crossing by adopting trench less technology (e.g. Jack Pushing Method etc) at 7 nos location at Zone-V area Improvement of RCFA Part-I Piped Water Supply Scheme under RCFA Division-I PHE Dte. ORD/000837/2022-2023 1065/RCD-I 23/03/2023 30 MRITYUNJOY MUKHERJEE & CO. 45.79 45.79 50
743 RCFA Division -I Engagement of 01 (One) person under control of 02 (Two) nos Assistant Engineers of RCFA Division-I for day to day report and return of FHTC as per scheme wise, Panchayet wise and updation of JJM and verification of FHTC connection of School Aganawadi and Heath Centre and monitoring of report return of training of Asha Karmi under Health Department as per direction of EIC. under RCFA Division-I PHE Dte. (w.e.f. 01.01.2022 to 31.12.2022)(Sl no 03) ORD/000838/2021-2022 2456/RCD- 1 31/12/2021 365 MUKHERJEE TRADERS 1.73 0.87 0
744 RCFA Division -I Acceptance cum work order for Dismanting of existing Drain and reconstruction the same, Construction of RCC pipe carring structur and other allied work at Alladih more and Rupnarayanpur Railway Station Site of improvement of RCFA Part -I in Connection of Rising main Part-A under RCFA Division-I PHE Dte.(Sl No. 06) ORD/000838/2022-2023 1066/RCD I 23/03/2023 30 MAK CONSTRUCTION CO. 31.64 29.75 100
745 RCFA Division -I Acceptance cum work order Distribution Network for Bagdiha Piped Water Supply Scheme at Jamuria Block Including FHTC & allied work under RCFA Division-I PHE Dte. (Part-C) ORD/000839/2022-2023 1069/RCD-I 23/03/2023 90 M/S S.K. ENTERPRISE 61.35 21.20 35
746 RCFA Division -I Acceptance cum work order for Rising Main for Bagdiha Piped Water Supply Scheme under RCFA Division-I PHE Dte. (Sl No. 07) ORD/000840/2022-2023 1067/RCD I 23/03/2023 1105 D.S.C. CONCERN 12.64 0.00 100
747 RCFA Division -I Acceptance cum work order Distribution Network for Bagdiha Piped Water Supply Scheme at Jamuria Block Including FHTC & allied work under RCFA Division-I PHE Dte. (Part-D) ORD/000841/2022-2023 1071/RCD-I 23/03/2023 90 TARA MA ENTERPRISE 54.95 15.27 0
748 RCFA Division -I Acceptance cum work order Sinking of 03 (Three) Nos river bed tube wells including collecting main, Sluice Valve chamber & other allied work at Darbardanga H/W at Ajoy River under Augmentation of Jamuria Rural (Zone I & II) Water Supply Scheme under RCFA Division-I PHE Dte. ORD/000843/2022-2023 1076/RCD-I 23/03/2023 90 MAA ENTERPRISE. 19.58 8.87 100
749 RCFA Division -I Acceptance cum work order for Repair and renovation works of one no RCC Elevated Reservoir of capacity 1362 cum at Chora for RCFA Part-II (Zone-9, 9A & 9B) Piped Water Supply Scheme under RCFA Division-I PHE Dte. (Sl No. 12) ORD/000844/2022-2023 1078/RCD I 23/03/2023 270 ASHA CONSTRUCTION 17.06 14.88 100
750 RCFA Division -I Acceptance cum work order Distribution Network and allied work for Ukhra area of RCFA Part-II Piped Water Supply Scheme allied work under RCFA Division-I PHE Dte. (Zone-2A)(Sl. No. 13) ORD/000845/2022-2023 1080/RCD-I 23/03/2023 90 GITASREE FABRICATION 97.20 0.00 80
751 RCFA Division -I Acceptance cum work order for Distribution Network for RCFA Part-II Piped Water Supply Scheme including FHTC & allied works under RCFA Division-I PHE Dte.(Zone-9) Parshkol (Part-B)(Sl No. 16) ORD/000846/2022-2023 1081/RCD I 23/03/2023 90 ALOKESH BANERJEE 40.44 13.78 35
752 RCFA Division -I Acceptance cum work order for Supplying aligning & laying 225 mm dia HDPE pipe line in related to distribution Network for Augmentation of Sarisatali Piped W/S Scheme under RCFA Division-I PHE Dte. ( Sl No. 18) ORD/000848/2022-2023 1085/RCD I 23/03/2023 90 JAYANTA DATTA 19.21 18.02 100
753 RCFA Division -I Acceptance cum work order Construction of drain at Ethora and its adjoining mouzas under Improvement of RCFA Part-I W/S Scheme within command area of Zone-VIII under RCFA Division-I PHE Dte. ORD/000849/2022-2023 1086/RCD-I 23/03/2023 60 SWATI CORPORATION 23.95 23.94 0
754 RCFA Division -I Acceptance cum work order for Distribution Network for Augmentation of RCFA Part-II Piped Water Supply Scheme including FHTC & allied work under RCFA Division-I PHE Dte. (Zone-7) Segment-1 ORD/000850/2022-2023 1098/ RCD-I 23/03/2023 90 MAK CONSTRUCTION CO. 97.63 13.69 15
755 RCFA Division -I Acceptance cum work order for Providing FHTC through Retrofitting at Ukhra Area (Phase-II) Block-Andal & Pandabeswar of Ukhra Water Supply Scheme under RCFA Division-I PHE Dte. (Part-D) ORD/000851/2021-2022 2332/RCD-1 17/12/2021 30 RELIABLE ENGINEERS CO-OP CONSTRUCTION SOCIETY LTD. 14.44 4.03 0
756 RCFA Division -I Acceptance cum work order for Distribution Network for Augmentation of RCFA Part-II Piped Water Supply Scheme within command area of Zone-10 (Segment-III) under RCFA Division-I PHE Dte. ORD/000851/2022-2023 1112/ RCD I 23/03/2023 90 UNITED CONSTRUCTION 86.38 65.24 75
757 RCFA Division -I Acceptance cum work order Construction of Concrete retaining wall with land development Churulia Ajoy River Bed Site under Augmentation of Churulia W/S Scheme under RCFA Division-I PHE Dte. ORD/000852/2022-2023 1088/RCD-I 23/03/2023 90 S. CHAKRABORTY & CO. 44.66 40.55 100
758 RCFA Division -I Acceptance cum work order for Distribution Network for Augmentation of RCFA Part-II Piped Water Supply Scheme including FHTC & allied work under RCFA Division-I PHE Dte. (Zone-7) Segment-2 ORD/000853/2022-2023 1100/RCD I 23/03/2023 90 RELIABLE ENGINEERS CO-OP CONSTRUCTION SOCIETY LTD. 89.86 37.08 50
759 RCFA Division -I Acceptance come work order for Balance work for distribution network of Churulia Madhudanga and its adjoining mouzas (Zone-II) under Augmentation of Churulia W/S Scheme under RCFA Division-I PHE Dte. (Sl No. 20) ORD/000854/2022-2023 1087/RCD-I 23/03/2023 90 MD AAMIR KHAN 16.38 16.32 100
760 RCFA Division -I Acceptance cum work order for Distribution Network for Augmentation of RCFA Part-II Piped Water Supply Scheme within command area of Zone-10 (Segment-II) under RCFA Division-I PHE Dte. ORD/000855/2022-2023 1113/ RCD I 23/03/2023 1174 M/S KONAR CONSTRUCTION 84.65 11.07 50
761 RCFA Division -I Acceptance cum work order for Distribution Network for Augmentation of RCFA Part-II Piped Water Supply Scheme including FHTC & allied work under RCFA Division-I PHE Dte. (Zone-7) Segment-3 (Sl No. 03) ORD/000856/2022-2023 1102/RCD I 23/03/2023 90 RUBY CONSTRUCTION 94.47 48.98 70
762 RCFA Division -I Acceptance cum work order Laying & Pushing of 400 mm dia RCC (NP3) Hume pipe by adopting trench less technology (e.g. Jack Pushing Method etc) of water pipe lines at Sandi More (Node point 137) Sandi Masimura More (Node point 85) and Lalganj Domhani Road (Node point 5-26) under Augmentation of RCFA Part-I PWSS within command area of Zone-VIII under RCFA Division-I PHE Dte. ORD/000857/2022-2023 1093/RCD-I 23/03/2023 30 SWATI CORPORATION 19.65 19.65 0
763 RCFA Division -I Acceptance cum work order for Distribution Network for Augmentation of RCFA Part-II Piped Water Supply Scheme including FHTC & allied work under RCFA Division-I PHE Dte. (Zone-7) Segment-4 ORD/000858/2022-2023 1104/RCD I 23/03/2023 90 M/S MONI TRADERS 93.11 39.26 45
764 RCFA Division -I Acceptance cum work order for Construction of approach road, land development, CWR painting, Cable trench slab, drainage system at Runakuraghat H/W campus under Augmentation of Itapara Water Supply Scheme under RCFA Division-I PHE Dte. (Sl No. 24) ORD/000859/2022-2023 1090/RCD-I 23/03/2023 60 SRI KRISHNA ENTERPRISE 37.83 35.84 100
765 RCFA Division -I Acceptance cum work order for Distribution Network for Augmentation of RCFA Part-II Piped Water Supply Scheme within command area of Zone-10 (Segment-I) under RCFA Division-I PHE Dte ORD/000860/2022-2023 1115/ RCD I 23/03/2023 90 M/S B.K. CONSTRUCTION 86.29 32.00 38
766 RCFA Division -I Laying & Pushing of 800 mm dia RCC (NP3) Hume pipe by adopting trench less technology (e.g. Jack Pushing Method etc) of Water Pipe Lines including supplying and laying of 500 mm dia and 150 mm dia MS pipe line at different location on Asansol Chittaranjan Road within command area of Zone-I (Dendua OHR) Distribution system (Part-B) under Improvement of RCFA Part-I PWSS under RCFA Division-I PHE Dte. ORD/000861/2022-2023 1095/RCD-I 23/03/2023 30 SWATI CORPORATION 25.75 25.59 0
767 RCFA Division -I Acceptance cum Work Order for Laying & Pushing of 400 mm dia RCC (NP3) Hume pipe by adopting trench less technology (e.g. jack Pushing Method etc) of Water Pipe Lines at Dabor More (Node point 334) Youth club (Node point 398) and Jaya hotel (Node point 228) Augmentation of RCFA Part-I PWSS within command area of Zone-VII under RCFA Division-I PHE Dte. (Part-E) (Sl No. 28) ORD/000862/2022-2023 1094 / RCD-I 23/03/2023 30 TARA CONSTRUCTION 23.59 23.59 0
768 RCFA Division -I Acceptance cum work order for distribution Network for Augmentation of RCFA Part-II Piped Water Supply Scheme including FHTC & allied work under RCFA Division-I PHE Dte. (Zone-7) Segment-5 ORD/000863/2022-2023 1106/RCD I 23/03/2023 90 B.T.M CONCERN 94.60 60.02 65
769 RCFA Division -I Acceptance cum work order forLaying of different dia HDPE pipe line including concrete cutting and mending work at Khyerbaid, Amdiha area Zone-IX under Improvement of RCFA Part-I Water Supply Scheme under RCFA Division-I PHE Dte. (Sl. No. 26) ORD/000864/2022-2023 1092/RCD-I 23/03/2023 60 SRI KRISHNA ENTERPRISE 24.69 13.18 80
770 RCFA Division -I Acceptance cum work order for Distribution Network for Bagdiha Piped Water Supply Scheme at Jamuria Block Including FHTC & allied work under RCFA Division-I PHE Dte. (Part-E)( Sl No. 10) ORD/000865/2022-2023 1072/RCD-I 23/03/2023 90 R B ENTERPRISE 68.85 31.93 50
771 RCFA Division -I Acceptance cum work order Distribution Network for Augmentation of RCFA Part-II Piped Water Supply Scheme within command area of Zone-10 (Segment-VI) under RCFA Division-I PHE Dte. ORD/000866/2022-2023 1108/RCD-I 23/03/2023 90 VISUVIOUS 54.47 47.84 90
772 RCFA Division -I Acceptance cum Work Order for Distribution Network for Augmentation of RCFA Part-II Piped Water Supply Scheme within command area of Zone-10 (Segment-V) under RCFA Division-I PHE Dte. (Sl No. 07) ORD/000867/2022-2023 1110/RCD-I 23/03/2023 90 DIP CONSTRUCTION 90.17 31.53 35
773 RCFA Division -I Acceptance cum work order Distribution Network for Augmentation of RCFA Part-II Piped Water Supply Scheme including FHTC & allied work under RCFA Division-I PHE Dte. (Zone-4A) (Part-C) ORD/000868/2022-2023 1118/RCD-I 23/03/2023 90 UNITED CONSTRUCTION 81.57 75.71 90
774 RCFA Division -I Acceptance cum work order Distribution Network for Augmentation of RCFA Part-II Piped Water Supply Scheme including FHTC & allied work under RCFA Division-I PHE Dte. (Zone-4A) (Part-E) ORD/000869/2022-2023 1120/RCD-I 23/03/2023 800 JAYANTA DATTA 91.65 20.35 70
775 RCFA Division -I Acceptance cum work order for Distribution Network for Augmentation of RCFA Part-II Piped Water Supply Scheme including FHTC & allied work under RCFA Division-I PHE Dte. (Zone-4A) (Part-B)(Sl No. 12) ORD/000870/2022-2023 1116/RCD-I 23/03/2023 90 BABA LOKNATH ENTERPRISE 71.02 48.63 80
776 RCFA Division -I Hiring of SUV (A.C) (Non-Air conditioned) Bharat Stage-IV/BS-IV purchased on or after 01.01.2022 with Diesel/LPG/CNG Engine. For the office Use of the Deputy Superintending Engineer Engineer, RCFA W/S Circle, PHE Dte Govt. of West Bengal (w.e.f 01.02.2023 to 31.07.2023) ORD/000872/2022-2023 455/RCDI 31/01/2023 181 SHYAMAL MAJI 0.90 0.30 80
777 RCFA Division -I Acceptance cum work order for Repair and renovation works of One no. RCC Elevated Reservoir of capacity 550 cum at Dignala for Augmentation of Ondal Phase-II/A Piped Water Supply Scheme under RCFA Division-I PHE Dte. (Sl No. 02) ORD/000873/2022-2023 1124/ RCD I 24/03/2023 90 M/S SUBHRADEEP 11.00 9.25 100
778 RCFA Division -I Acceptance cum work order Additional work for the laying of Distribution Network for Improvement RCFA Part-I Water Supply within command area of Zone-VI under RCFA Division-I PHE Dte. (Part-B) ORD/000874/2022-2023 1134/RCD-I 24/03/2023 30 M/S K & KONAR CONSTRUCTION 30.49 19.00 100
779 RCFA Division -I Acceptance cum work order Additional work for the laying of Distribution Network for Improvement RCFA Part-I Water Supply Scheme within command area of Zone-XI (Part-4 Distribution Segment) under RCFA Division-I PHE Dte. ORD/000875/2022-2023 1136/RCD-I 24/03/2023 30 DAWN CONSTRUCTION 56.15 31.27 90
780 RCFA Division -I Acceptance cum work order for Construction of Boundary Wall with Gate at OHR Site (Length- 120 mtrs) at Nimcha village of Raniganj Block for Augmentation of Amritnagar Zone-II Piped Water Supply Scheme under RCFA Division-I PHE Dte. in the District of Paschim Bardhaman ORD/000876/2022-2023 1125/ RCD I 24/03/2023 30 ZEROTH CONTROL SYSTEM 10.18 0.00 0
781 RCFA Division -I Acceptance cum work order Additional work for the laying of Distribution Network for Improvement RCFA Part-I Water Supply Scheme within command area of Zone-XI (Part-7 Distribution Segment) under RCFA Division-I PHE Dte. ORD/000878/2022-2023 1138/RCD-I 24/03/2023 30 UNITED CONSTRUCTION 24.64 17.12 90
782 RCFA Division -I Acceptance cum work order forConstruction of Boundary Wall with Gate at OHR Site (Length-160 mtrs) at Ondal Block for Augmentation of Ondal Phase- II/B Piped Water Supply Scheme under RCFA Division-I PHE Dte. in the District of Paschim Bardhaman ORD/000879/2022-2023 1126/ RCD I 24/03/2023 30 AMAR CONSTRUCTION 13.43 13.27 100
783 RCFA Division -I Acceptance cum work order for Repairing, Renovation, renewing & overhauling & obsolete i) for 2 nos. Iron Removal Plant (Pressure type) each capacity 45 cum/Hr at Churulia Head Works Site for Augmentation of Churulia W/S Scheme under RCFA Division-I PHE Dte. (Part-A) ii) for 3 Nos. Iron Removal Plant (Pressure type of capacity 50 cum/hr 1no. & 75cum/hr ¿ 2nos) at Madantore Head works site for Madantore W/S Scheme under RCFA Division-I PHE Dte. (Part-B) iii) for 4 nos. Iron removal Plant (Pressure type) each capacity 20 cum/hr at Pandabeswar Head Works Site for Pandabeswar W/S Scheme under RCFA Division-I PHE Dte. (Part-C) iv) for 2 nos. Iron Removal Plant (Pressure type) each capacity 50 cum/hr at Madanpur Head Works Site under RCFA Division-I PHE Dte. (Part-D) ORD/000879/2023-2024 1391_I_RCD_I 11/04/2023 60 TARAPRASAD SARKAR 52.19 46.97 70
784 RCFA Division -I Acceptance cum Work Order for Special Repair & Renovation of existing High Lift Pump House, Boundary Wall, Guard Room, CWR, Switch Room etc. and allied works at H/W Site of Amritnagar Piped Water Supply Scheme. ORD/000880/2022-2023 1145/RCD-1 24/03/2023 30 RUBY CONSTRUCTION 9.83 9.59 0
785 RCFA Division -I Acceptance cum work order Additional work for the laying of 315 mm dia HDPE pipe instead of 300 mm dia D.I. pipe of Distribution Network for Improvement RCFA Part-I Water Supply Scheme within command area of Zone-XI (Part-6 Distribution Segment) Augmentation of Roshna Piped Water Supply Scheme under RCFA Division-I PHE Dte. ORD/000882/2022-2023 1140/RCD-I 24/03/2023 30 UMA ENTERPRISE 71.96 70.46 30
786 RCFA Division -I Acceptance cum work order for Laying & Pushing of 600 mm dia RCC (NP3) Hume pipe by adopting trench less technology (e.g. Jack Pushing Method etc.) at Lalganj more and Nuni more in related to laying of rising main (Part-B) under Improvement of RCFA Part-I PWSS under RCFA Division-I PHE Dte. ORD/000883/2022-2023 1127/ RCD I 24/03/2023 15 M/S MONDAL ENTERPRISE 23.75 23.62 0
787 RCFA Division -I Acceptance cum Work Order for Construction of Boundary Wall with Gate at OHR Site (Length-80 mtrs) at Amritnagar H/W Site (Damalia village) of Raniganj Block for Augmentation of Amritnagar Zone-II Piped Water Supply Scheme under RCFA Division-I PHE Dte. in the District of Paschim Bardhaman (Sl No. 03) ORD/000884/2022-2023 1147/RCD-1 24/03/2023 892 M/S MONDAL CONSTRUCTION 7.04 6.94 100
788 RCFA Division -I Acceptance cum work order for Additional for Distribution Network for Augmentation of Ondal (Phase-II/A) Piped Water Supply Scheme (Part-1) Block- Andal Dist - Paschim Bardhaman under RCFA Division-I PHE Dte. (Sl No. 08) ORD/000885/2022-2023 1129/ RCD I 24/03/2023 30 SIMA ENTERPRISE 13.76 9.36 80
789 RCFA Division -I Acceptance cum work order for Sinking of 1 (One) no. 200 mm dia river bed tube well in the river Ajoy including 01 (One) no collecting main of Augmentation of Madantor Piped Water Supply Scheme under RCFA Division-I PHE Dte. (Sl No. 22) ORD/000886/2022-2023 1165/RCD I 24/03/2023 60 R B ENTERPRISE 5.77 5.68 0
790 RCFA Division -I Acceptance cum work order for Construction of 1.5 mtrs Height Boundary Wall with double column after 15 mtrs interval along with 750 mm Height 3 layer Barbed Wire around Roshna Head Works Site under Augmentation of Roshna Piped Water Supply Scheme under RCFA Division-I PHE Dte. (Sl. No. 09) ORD/000887/2022-2023 1131/ RCD I 24/03/2023 30 SRI KRISHNA ENTERPRISE 27.16 25.57 95
791 RCFA Division -I Acceptance cum Work Order for Land development with approach road including internal drain at Head Works Site for Augmentation of Ondal Phase II/B Piped Water Supply Scheme under RCFA Division-I PHE Dte. in the District of Paschim Bardhaman (Sl No. 04) ORD/000888/2022-2023 1148/RCD-1 24/03/2023 30 AMAR CONSTRUCTION 6.50 6.09 100
792 RCFA Division -I Emergent Sinking of one no.200 x 165 mm Rig box tubewell at ADM Bunglow, Asansol, Paschim Bardhaman, Under R.C.F.A Div-I, PHE Dte. ORD/000888/2023-2024 SpotNITCamp-02/ADMBunglow 09/01/2024 7 M/S CHANDI CHARAN ROY 7.50 7.44 100
793 RCFA Division -I Acceptance cum work order for repair and renovation works of GLR of capacity 90 cum for Augmentation of Madantor Piped Water Supply Scheme under RCFA Division-I PHE Dte. (Sl No. 23) ORD/000889/2022-2023 1166/RCD I 24/03/2023 180 A.K.CONSTRUCTION 6.48 0.00 5
794 RCFA Division -I Acceptance cum work order for Repairing and renovation of existing culvert, Pump House, Staff Quarter under Augmentation of Panuria Piped Water Supply Scheme under RCFA Division-I PHE Dte. (Sl No. 24) ORD/000891/2022-2023 1167/RCD I 24/03/2023 90 R B ENTERPRISE 5.94 5.88 0
795 RCFA Division -I Acceptance cum Work Order for Land development with approach road including internal drain at Head Works Site for Augmentation of Amritnagar Zone-II Piped Water Supply Scheme under RCFA Division-I PHE Dte. in the District of Paschim Bardhaman (Sl No.- 05) ORD/000892/2022-2023 1149/RCD-1 24/03/2023 948 ZEROTH CONTROL SYSTEM 6.50 0.00 40
796 RCFA Division -I Acceptance cum work order for Additional work for the laying of Distribution Network for Improvement RCFA Part-I Water Supply Scheme within command area of Zone-VI under RCAF Division-I PHE Dte. (Part-C) (Sl. No. 17) ORD/000893/2022-2023 1143/ RCD I 24/03/2023 30 RANJIB GHATAK 26.19 12.65 90
797 RCFA Division -I Acceptance cum work order for Construction of Store Room at Chora of Pandabeswar Block for Augmentation of RCFA Part-II (Zone-9) Piped Water Supply Scheme under RCFA Division-I PHE Dte. in the District of Paschim Bardhaman (Sl No. 25) ORD/000894/2022-2023 1168/RCD I 24/03/2023 90 M/S S.K. ENTERPRISE 4.61 0.00 0
798 RCFA Division -I Acceptance cum work order for Additional work for the laying of Distribution Network for Improvement RCFA Part-I Water Supply Scheme within command area of Zone-XI (Part-6 Distribution Segment) under RCAF Division-I PHE Dte. (SL No. 16) ORD/000895/2022-2023 1142/ RCD I 24/03/2023 283 UMA ENTERPRISE 76.17 32.70 100
799 RCFA Division -I Acceptance cum Work Order for Construction of Guard room with toilet under Ondal Phase-II/B Piped Water Supply Scheme under RCFA Division-I PHE Dte. (Sl No. 06) ORD/000896/2022-2023 1150/RCD-1 24/03/2023 60 SUBHADEEP DAS 5.64 5.53 100
800 RCFA Division -I Acceptance cum Work Order for Additional laying of 90 mm dia HDPE pipe of distribution network at Aliganj and surrounding area for Augmentation of Roshna Piped Water Supply Scheme under RCFA Division-I PHE Dte. (Sl No. 07) ORD/000897/2022-2023 1151/RCD-1 24/03/2023 30 RUBY CONSTRUCTION 5.99 4.63 50
801 RCFA Division -I Acceptance cum Work Order for Road crossing by open cut near to Nuni more including construction of drain, laterite cutting, concrete and bitumen road cutting and allied works at Ethora and adjacent area for laying of Rising Main (Part-B) for Improvement of RCFA Part-I Piped Water Supply Scheme under RCFA Division-I PHE Dte. (Sl No. 08) ORD/000898/2022-2023 1152/RCD-1 24/03/2023 15 M/S MONDAL ENTERPRISE 5.09 4.70 100
802 RCFA Division -I Acceptance cum work order for Construction of Store Room at Head Works Site for (Zone-4A) of Pandabeswar and Andal Block for Augmentation of RCFA Part-II Piped Water Supply Scheme under RCFA Division-I PHE Dte. in the District of Paschim Bardhaman. (Sl No. 29) ORD/000902/2022-2023 1173/RCD I 24/03/2023 90 RANJIB GHATAK 4.61 0.00 0
803 RCFA Division -I Acceptance cum work order Concrete road cutting and mending work for laying distribution pipe line at Das Para (Sansad-XIX) at Ukhra area Block ¿ Andal and Pandabeswar under Augmentation of RCFA Part-II (Zone-2A) PWSS under RCFA Division-I PHE Dte. (Sl No. 17) ORD/000903/2022-2023 1161/RCD-I 24/03/2023 15 JYOGOMAYA ENTERPRISE 2.01 1.94 100
804 RCFA Division -I Acceptance cum work order for Construction of Chlorine Room (Size 4.1 m x 3.5 m out to out) at Shankarpur OHR Site for Augmentation of RCFA part-II (Zone-4A and 4B) Piped Water Supply Scheme under RCFA Division-I PHE Dte. (Sl No. 27) ORD/000904/2022-2023 1171/RCD I 24/03/2023 277 RANJIB GHATAK 4.61 0.00 100
805 RCFA Division -I Formal work order for Additional work for allied work in connection with in connection supply, laying fitting, fixing of 15 mm NB PVC (Schedule 80) / 2020 mm OD HDPE (PE 80, PN 6) pipe with all necessary specials piece etc. all complete for Augmentation of Sub-Station Water Based Piped Water Supply Scheme for Amritnagar Zone-II under RCFA Division-I PHE Dte. ORD/000904/2023-2024 158/RCD-I 22/01/2024 435 MRITYUNJOY MUKHERJEE & CO. 213.03 182.47 85
806 RCFA Division -I Acceptance cum work order Laying of different dia HDPE pipe line and allied works at Kankardanga Part (Sansad-VIII) at Ukhra area under Augmentation of RCFA Part-II (Zone-2A) PWSS under RCFA Division-I PHE Dte. (Sl No. 18) ORD/000906/2022-2023 1162/RCD-I 24/03/2023 15 SHILPA UDDOYG ENGINEERING CO-OP SOCIETY LTD. 1.42 1.29 100
807 RCFA Division -I Acceptance cum work order for Approach road and others necessary allied works at Front Gate to village road for Shankarpur OHR Site (Zone-4A and 4B) Piped Water Supply Scheme under RCFA Division-I PHE Dte. (Sl No 28) ORD/000908/2022-2023 1172/RCD I 24/03/2023 60 RANJIB GHATAK 3.78 3.70 100
808 RCFA Division -I Acceptance cum work order Concrete road cutting mending works for laying of distribution pipe line at Kankardanga Part (Sansad-VIII) at Ukhra area Block-Andal and Pandabeswar under Augmentation of RCFA Part-II (Zone-2A) PWSS under RCFA Division-I PHE Dte. (Sl No. 19) ORD/000909/2022-2023 1163/RCD-I 24/03/2023 15 MS KALYAN ENTERPRISE 2.77 2.71 100
809 RCFA Division -I Acceptance cum Work Order for Additional work line concrete cutting and allied works for Augmentation of Nutondanga RCFA Part-II (Zone-1A) piped W/S Scheme of durgapur sub-Division under RCFA division-I PHE dte. ORD/000909/2023-2024 214/RCD-I 29/01/2024 30 ALOK ENTERPRISE (A UNIT OF SAKET TREXIM PVT. LTD.) 35.52 35.52 70
810 RCFA Division -I Acceptance cum work order for Construction of Chlorine Room of size (4.50 x 3.50 M) at (Zone-17) of Raniganj Block for Augmentation of RCFA Part-II Piped Water Supply Scheme under RCFA Division-I PHE Dte. in the District of Paschim Bardhaman (Sl No. 30) ORD/000910/2022-2023 1174/RCD I 24/03/2023 739 N.R. CONSTRUCTION 4.61 0.00 100
811 RCFA Division -I Acceptance cum work order for Construction of Chlorine Room of size (4.50 x 3.50 M) at (Zone-16) of Raniganj Block for Augmentation of RCFA Part-II Piped Water Supply Scheme under RCFA Division-I PHE Dte. in the District of Paschim Bardhaman (Sl No. 31) ORD/000911/2022-2023 1175/RCD I 24/03/2023 90 N.R. CONSTRUCTION 4.61 0.00 0
812 RCFA Division -I Acceptance cum Work Order for balance work for Construction of site office at Panagarh of RCFA Division-I PHE Dte. under Augmentation of Jatgoria W/S Scheme JJm Fund. ORD/000911/2023-2024 211/RCD-I 29/01/2024 60 BASANTI TRADERS 32.98 32.76 100
813 RCFA Division -I Acceptance cum work order for Supply of GI pipes to Searsole Store under Augmentation of RCFA Part-II (Zone-15) PWSS under RCFA Division-I PHE Dte. ORD/000912/2023-2024 216/RCD-I 29/01/2024 20 INDIA PIPE FITTING CO 89.25 89.23 100
814 RCFA Division -I Acceptance cum work order for Construction of boundary wall Gate at OHR Site (Length-60 mtrs) at Bagdiha of Jamuria Block for Augmentation of Bagdiha Piped Water Supply Scheme under RCFA Division-I PHE Dte. in District Paschim Bardhaman (Sl No. 20) ORD/000913/2022-2023 1164/ RCD I 24/03/2023 60 M/S KALYANI ENTERPRISE 5.31 0.00 0
815 RCFA Division -I Acceptance cum Work Order for Construction of Chlorine Room of size (4.50 x 3.50 M) at (Zone-18) of Raniganj Block for Augmentation of RCFA Part-II Piped Water Supply Scheme under RCFA Division-I PHE Dte. in the District of Paschim Bardhaman. (Sl No. 32) ORD/000914/2022-2023 1176/RCD-1 24/03/2023 90 GOPAL CONSTRUCTION 4.61 0.00 0
816 RCFA Division -I Acceptance cum work order for Supply of GI pipes to Searsole Store under Augmentation of RCFA Part-II (Zone-17) PWSS under RCFA Division-I PHE Dte. ORD/000914/2023-2024 217/RCD-I 29/01/2024 20 MAKALI ENGINEERING CORPORATION 90.40 90.40 100
817 RCFA Division -I Acceptance cum Work Order for Construction of Chlorine Room (Size 4.1 m x 3.5 m out to out) at OHR Site for Augmentation of Ondal Phase-II/B Piped Water Supply Scheme under RCFA Division-I PHE Dte.(Sl No. 34) ORD/000915/2022-2023 1177/RCD-1 24/03/2023 90 SUBHADEEP DAS 4.61 3.91 100
818 RCFA Division -I Acceptance cum Work Order for Repairing of Boundary Wall for 45 mtr at Chora OHR Site of RCFA Part-II (Zone- 9, 9A and 9B) PWSS Block-Pandabeswar under RCFA Division-I PHE Dte. (Sl No. 01) ORD/000916/2022-2023 1144/RCD-1 24/03/2023 15 N.R. CONSTRUCTION 4.61 1.86 100
819 RCFA Division -I Acceptance cum work order for Additional work for Construction of 350 cum OHR at Arrah Sibtala, Block-Kanksa Dist - Paschim Bardhaman under Augmentation of Bamunara W/S Scheme under RCFA Division-I PHE Dte. ORD/000916/2023-2024 210/RCD-I 29/01/2024 60 AMARANJALI CONSTRUCTION 39.01 7.74 65
820 RCFA Division -I Formal work order for construction of CWR 150 cum, sub station building of H/W site, pump house, chlorine room and other allied work (Bank of Ajoy river) under Semalya water Supply Scheme under RCFA Div-I, PHE Dte. ORD/000917/2022-2023 1216/RCDI 24/03/2023 1320 SHILPA UDDOYG ENGINEERING CO-OP SOCIETY LTD. 120.09 75.06 75
821 RCFA Division -I Acceptance cum work order for Construction of Guard Room with toilet under Mangalpur Water Supply Scheme under RCFA Division-I PHE Dte. ORD/000922/2023-2024 300/RCD-I 07/02/2024 15 M/S SUBHRADEEP 5.63 0.00 0
822 RCFA Division -I Acceptance cum work order Laying of different 140 mm dia HDPE pipe line including interconnection and fitting, fixing sluice valves and etc allied works at Maira Dipu area under Khandra Zone under RCFA Part-II Water Supply Scheme under RCFA Division-I PHE Dte. ORD/000923/2022-2023 1259/ RCD I 27/03/2023 15 TARA CONSTRUCTION 2.32 2.16 0
823 RCFA Division -I Acceptance cum work order for Repairing of Boundary Wall at Khandra Bisswari OHR Site under RCFA Part-II Water Supply Scheme under RCFA Division-I PHE Dte. ORD/000923/2023-2024 299/RCD-I 07/02/2024 45 NATIONAL CONSTRUCTION 11.15 6.65 100
824 RCFA Division -I Acceptance cum work order Emergency repairing of damaged collecting main in river Damodar and allied works at Surjanagar H/W site of Surjanagar W/S Scheme under RCFA Division-I PHE Dte. ORD/000924/2022-2023 1257/RCD-I 27/03/2023 15 MD. JAWED KHAN 4.31 4.15 0
825 RCFA Division -I Acceptance cum work order Supply and installation of sluice valve, shifting of household connection instead of old AC pipe line to distribution branch and etc allied works at Baidyanathpur Namopara, Bouripara and adjacent area under Baidyanathpur W/S Scheme under RCFA Division-I PHE Dte. ORD/000926/2022-2023 1258/ RCD I 27/03/2023 15 SOMNATH SAMANTA 2.50 2.49 0
826 RCFA Division -I Acceptance cum work order for Balanced work at Shyamsundarpur Zone-13 of Augmentation of RCFA Part II Piped Water Supply Scheme Volume -I under RCFA Division-I PHE Dte ORD/000926/2024-2025 2802_RCD-1 29/11/2024 244 MD AAMIR KHAN 95.62 0.00 100
827 RCFA Division -I Acceptance cum work order Repairing & shifting work of DI pipes and allied repairing at Madanpur under Madanpur W/S Scheme under RCFA Division-I PHE Dte. ORD/000928/2022-2023 1261/ RCD I 27/03/2023 15 MAK CONSTRUCTION CO. 3.22 3.21 100
828 RCFA Division -I Acceptance cum work order Laying of 90 mm dia HDPE pipe line and etc allied works at Baidyanathpur Namopara, Bouripara under Baidyanathpur W/S Scheme under RCFA Division-I PHE Dte. ORD/000929/2022-2023 1264/RCD-I 27/03/2023 15 SOMNATH SAMANTA 2.72 2.59 0
829 RCFA Division -I Acceptance cum work order Laying of different dia HDPE pipe line towards Ruidas Para and Baouripara under Dakshin Khanda (Jl No. 36) area Block - Andal of RCFA Part-II W/S Scheme under RCFA Division-I PHE Dte. ORD/000938/2022-2023 1272/ RCD I 27/03/2023 15 DURGADAS MONDAL 3.71 3.68 0
830 RCFA Division -I Allied work Balance Work of Road restoration in connection with formal work order Distribution network including FHTC and allied work at Ondal Block of Augmentation of RCFA Part II Piped Water Supply Scheme Volume-II under RCFA Division-I PHE Dte. ORD/000938/2023-2024 452/RCD-1 12/02/2024 45 MRITYUNJOY MUKHERJEE & CO. 43.94 38.19 100
831 RCFA Division -I Acceptance cum work order for Construction of CWR (90 cum) at Surjanagar Head Works Site to replace existing damaged CWR under Improvement of RCFA (Part-I) Piped Water Supply Scheme. ORD/000939/2021-2022 376_RCD_I 15/02/2022 30 MD AAMIR KHAN 0.00 0.00 0
832 RCFA Division -I Acceptance cum work order Laying of different dia distribution pipe line at Sukopara (Part), Bauripara (Part) etc adjacent area at Ukhra Gram Panchayet (Sansad-XX) Augmentation of RCFA Part-II (Zone-2A) W/S Scheme under RCFA Division-I PHE Dte. ORD/000939/2022-2023 1275/RCD-I 27/03/2023 15 SOMNATH SAMANTA 3.25 2.95 0
833 RCFA Division -I Acceptance cum work order Repairing & shifting work of DI pipes, repairing of 350 mm dia MS pipe and allied repairing at Madanpur W/S Scheme under RCFA Division-I PHE Dte. ORD/000940/2022-2023 1278/ RCD I 27/03/2023 15 MD. JAWED KHAN 4.78 4.69 100
834 RCFA Division -I Acceptance cum work order Laying of different dia distribution pipe line at Baidyanathpur Namopara, Bouripara and adjacent area under Baidyanathpur W/S Scheme under RCFA Division-I PHE Dte. ORD/000942/2022-2023 1276/RCD-I 27/03/2023 15 SOMNATH SAMANTA 3.61 3.48 0
835 RCFA Division -I Acceptance cum work order Supplying Laying 90 mm dia HDPE pipe line, sluice valve chamber, Street Stand Post and other allied works within Amritnagar Rising Main & Distribution of Tirat Colliery W/S Scheme Zone under Improvement Part-II W/S Scheme under RCFA Division-I PHE Dte. ORD/000943/2022-2023 1279/RCD-I 27/03/2023 15 MS KALYAN ENTERPRISE 4.81 4.80 0
836 RCFA Division -I Acceptance cum work order Construction of Street Stand Post, Sluice Valve Chamber and Aligning Laying HDPE pipe in different places (Nimcha, Damra, Chelod Bouripara, Tirat Hospital Etc.) under Tirat Colliery W/S Scheme under RCFA Division-I PHE Dte. ORD/000944/2022-2023 1281/RCD-I 27/03/2023 15 MS KALYAN ENTERPRISE 4.57 4.57 80
837 RCFA Division -I Acceptance cum Work Order for Additional work for concrete dismantling restoration of concrete for 350 mm D.I. and 315 mm HDPE pipe line repair damaged PVC and GI pipe line and other allied works for Augmentation of RCFA Part II Piped Water Supply Scheme Volume -I within command area of Zone-VIII under RCFA Division-I PHE Dte ORD/000945/2023-2024 490/RCD-I 12/02/2024 30 TARA CONSTRUCTION 11.01 9.48 100
838 RCFA Division -I acceptance cum work order Repairing of 450 mm dia DI pipe line at Baidyanathpur, Barachak, Jagaridih area of ASTA rising main of ASTA Water Supply Scheme under RCFA Division-I PHE Dte. ORD/000946/2022-2023 1282/RCD-I 27/03/2023 15 SIMA ENTERPRISE 2.66 2.66 0
839 RCFA Division -I Acceptance cum work order for Allied work Balance Work of Road restoration in connection with Distribution Network including FHTC and allied work at Ondal Block of RCFA Part-II (Zone-6) Piped Water Supply Scheme under RCFA Division-I PHE Dte. ORD/000946/2023-2024 454/RCD-1 12/02/2024 45 MRITYUNJOY MUKHERJEE & CO. 45.34 43.80 50
840 RCFA Division -I Acceptance cum work order Interconnection work of 200 distribution main at Ukhra Zone and emergency repairing of 400 mm dia rising main at Khandra Zone under RCFA Part-II W/S Scheme under RCFA Division-I PHE Dte. ORD/000947/2022-2023 1285/ RCD I 27/03/2023 15 RANJIB GHATAK 4.28 4.26 100
841 RCFA Division -I Acceptance cum work order for Additional work for laying collecting and other allied works at DP Colony PWSS under RCFA Division-I PHE Dte. Augmentation PWSS of RCFA Part-II (Zone-11) ORD/000947/2023-2024 505/RCD-I 12/02/2024 30 DURGA DAS MONDAL 7.01 6.90 100
842 RCFA Division -I Acceptance cum work order for Plastering, painting works of Boundary Wall, Pump House, Chlorine Room CWR and other allied works and other allied works under Bagdiha W/S Scheme under RCFA Division-I PHE Dte. ORD/000950/2022-2023 1280/RCD-I 27/03/2023 15 M/S KALYANI ENTERPRISE 5.04 5.04 0
843 RCFA Division -I Balance work in connection with Improvement of RCFA Part-I Water Supply Scheme within command area of Zone-V with LDS and FHTC work under RCFA Division-I PHE Dte. ORD/000950/2023-2024 455/RCD-1 12/02/2024 45 MRITYUNJOY MUKHERJEE & CO. 21.29 19.26 100
844 RCFA Division -I Acceptance cum Work Order for Balance work for Laying of different dia HDPE pipe line (left out portion) and other allied works at Amritnagar (Part-B) under Augmentation of Amritnagar Zone-I under RCFA Division-I PHE Dte. ORD/000951/2023-2024 478/RCD-I 12/02/2024 45 TARAPRASAD SARKAR 44.86 31.52 80
845 RCFA Division -I Acceptance cum work order Additional work for supply and laying HDPE pipe instead of DI pipe for the work of laying distribution system under Augmentation of Amritnagar Zone-I under RCFA Division-I PHE Dte. ORD/000952/2023-2024 501/RCD-I 12/02/2024 45 M/S SINGH & KONAR CONSTRUCTION 30.11 15.98 50
846 RCFA Division -I Continuation work order for Hiring of SUV (A.C) (Non-Air conditioned) Bharat Stage-VI/BS-VI purchased on or after 01.01.2022 with Diesel/LPG/CNG Engine, for the office Use of the Executive Engineer, RCFA Division-I PHE Dte. (w.e.f. 01.12.2022 to 31.05.2023) ORD/000955/2022-2023 3057/RCD-I 30/11/2022 182 PRASENJIT DEY 0.90 0.00 0
847 RCFA Division -I Acceptance cum Work Order for Balance work for laying of different dia HDPE pipe line (left out portion) and other allied works at Amritnagar (Part-A) under Augmentation of Amritnagar Zone-I under RCFA Division-I PHE Dte. ORD/000955/2023-2024 2455/RCD-I 12/02/2024 45 M/S SINGH & KONAR CONSTRUCTION 45.53 0.00 0
848 RCFA Division -I Laying 300 mm dia MS water pipe line with 600 mm dia MS cashing pipe for Railway crossing in Salanpur in between KM 231/16-18 and Salanpur (SLS) Rupnarayanpur (RNPR) Station in Asansol Diviion under JJM under RCFA Division-I PHE Dte. ORD/000956/2023-2024 456/RCD-1 12/02/2024 45 MRITYUNJOY MUKHERJEE & CO. 37.06 36.88 100
849 RCFA Division -I Acceptance cum work order 300 mm dia MS Bye pass line and interconnection work at Khandra OHR site and allied works of Dakhin Khandra and Mahira adjacent area under Retrofitting of 4 Nos. Piped Water Supply Scheme under RCFA Division-I PHE Dte. ORD/000957/2022-2023 1056/RCD-I 23/03/2023 15 UNITED CONSTRUCTION 15.47 15.47 0
850 RCFA Division -I Acceptance cum work order for Emergency repairing work of CI rising main (500 mm dia, 200 mm dia & 150 mm dia ) at Chotdola more, Dhasal more and new Kenda and Searsole H/W site near Pump House under RCFA Part-II W/S Scheme under RCFA Division-I PHE Dte. ORD/000958/2023-2024 504/RCD-I 12/02/2024 30 DAWN CONSTRUCTION 8.84 0.00 0
851 RCFA Division -I Acceptance cum Work Order for Laying MS pipe over bridge / culvert including adopting trench less technology (e.g. Jack Pushing Method etc) at 4 (Four) nos location within laying distribution system of Amritnagar (Part-A) under Augmentation of Amritnagar Zone-I PWSS under RCFA Division-I PHE Dte. ORD/000959/2023-2024 483/RCD-I 12/02/2024 45 TARAPRASAD SARKAR 25.18 24.97 100
852 RCFA Division -I Acceptance cum work order Distribution Network for Augmentation of Jamgram Piped Water Supply Scheme including FHTC work Block Barabani, Dist-Paschim Bardhaman under RCFA Division-I PHE Dte. (Part-A) ORD/000960/2022-2023 1053/RCD-I 23/03/2023 30 SRI KRISHNA ENTERPRISE 90.22 34.13 55
853 RCFA Division -I Acceptance cum Work Order for Additional work for Electrical wiring of C and D type quarter building, PHE Housing Complex and Installation of street including arrangement and fedar box and other allied works under RCFA Division-I PHE Dte. ORD/000961/2023-2024 484/RCD-I 12/02/2024 15 T R ENTERPRISE 13.35 13.32 100
854 RCFA Division -I Acceptance cum work order for Adopting trench less technology (e.g. Jack Pushing Method etc.) at 3 (Three) nos location within laying distribution system of Amritnagar (Part-B) under Augmentation of Amritnagar Zone-I PWSS under RCFA Division-I PHE Dte. ORD/000963/2023-2024 457/RCD-1 12/02/2024 45 M/S SINGH & KONAR CONSTRUCTION 23.02 23.02 100
855 RCFA Division -I Acceptance cum work order for Laying of pipe line from Domhani Asansol main Road near BDO Office to Domohani PHC and construction of stand post at different places at Domohani Bazar under Barabani Development Block under RCFA Part-I W/S Scheme under RCFA Division-I PHE Dte. ORD/000966/2023-2024 458/RCD-1 12/02/2024 20 UNITED CONSTRUCTION 6.71 4.03 62
856 RCFA Division -I Acceptance cum work order for Construction of Guard Room with toilet at Malladihi OHR site under Chotkara Kanskuli Water Supply Scheme under RCFA Division-I PHE Dte. ORD/000967/2023-2024 717-A/RCD-I 01/03/2024 90 PINKI ENTERPRISE 5.97 0.00 0
857 RCFA Division -I Acceptance cum work order for Construction of Guard Room with toilet at Dabor OHR site under Chotkara Kanskuli Water Supply Scheme under RCFA Division-I PHE Dte. ORD/000970/2023-2024 460/RCD-1 12/02/2024 90 RELIABLE ENGINEERS CO-OP CONSTRUCTION SOCIETY LTD. 5.97 0.00 0
858 RCFA Division -I Acceptance cum Work Order for Sinking of 3 (Three) nos river bed tube wells including collecting main manifold sluice valve chamber reinforcement and other allied works at Damalia H/W under RCFA Part-II at Damodar river under Augmentation of Amritnagar Zone-II Water Supply Scheme under RCFA Division-I PHE Dte. (Part-B) ORD/000971/2023-2024 486/RCD-I 12/02/2024 25 M/S KALYAN ENTERPRISE 10.68 10.57 100
859 RCFA Division -I Acceptance cum work order for Supply of valves, construction of valve chamber, supplying laying HDPE/UPVC/GI pipe line and allied works at Putulia, Hosenpur and adjacent area under Augmentation of Itapara W/S Scheme under RCFA Division-I PHE Dte. ORD/000972/2023-2024 461/RCD-1 12/02/2024 30 R B ENTERPRISE 7.72 7.67 100
860 RCFA Division -I Sub Soil Investigation for 900 cum capacity RCC Over Head Reservoir at (Zone-XI) of Barabani Block for Improvement of RCFA Part-I Piped Water Supply Scheme under RCFA Division-I PHE Dte. in the District of Paschim Bardhaman ORD/000973/2022-2023 3148/RCD-I 12/12/2022 7 AMAR CONSTRUCTION 0.98 0.98 100
861 RCFA Division -I Acceptance cum Work Order for Additional works of Dismantling and concrete works supplying aligning and laying HDPE pipe and other allied works at distribution system network for Bagdiha (Part-D) Augmentation of Madantor Water Supply Scheme under RCFA Division-I PHE Dte. ORD/000973/2023-2024 491/RCD-I 12/02/2024 45 TARA MA ENTERPRISE 18.79 11.87 75
862 RCFA Division -I Acceptance cum Work Order for Sinking of 4 (Four) nos river bed tube wells including collecting main and other allied works at Damodar river under (Part-II) Unionpara Water Supply Scheme under RCFA Division-I PHE Dte. ORD/000974/2023-2024 492/RCD-I 12/02/2024 30 TARA MA ENTERPRISE 13.02 2.87 100
863 RCFA Division -I Acceptance cum work order for Additional Laying of 200 mm dia rising main for the Augmentation of Roshna Piped Water Supply Scheme . under RCFA Division-I PHE Dte. ORD/000975/2023-2024 462/RCD-1 12/02/2024 30 T R ENTERPRISE 12.98 12.18 100
864 RCFA Division -I Acceptance cum Work Order for Pipe line crossing adopting trench less Technology (e.g. Jack Pushing method etc.) near Deshbandhu Park, Chittaranjan Road, Joadbari Rupnarayanpur from node no 921 to 924 RCFA Part-I PWSS within command area of Zone-VII under RCFA Division-I PHE Dte. ORD/000979/2023-2024 494/RCD-I 12/02/2024 15 KONAR CONSTRUCTION 6.55 6.55 100
865 RCFA Division -I Acceptance cum work order for Construction of Godown for stacking of Cholorine at Searsole Head Work site of Augmentation PWSS Of RCFA Part-II (Zone-18) under RCFA Division-I PHE Dte. ORD/000980/2023-2024 466/RCD-1 12/02/2024 90 M/S MONDAL ENTERPRISE 9.50 9.27 100
866 RCFA Division -I Acceptance cum Work Order for Replacing existing UPVC pipe line with HDPE at Marickkota and different village under Salanpur Block under RCFA Part-I PWSS under RCFA Division-I PHE Dte ORD/000981/2023-2024 509/RCD-I 12/02/2024 45 SUKHENDU MAJUMDAR 6.37 0.00 0
867 RCFA Division -I Acceptance cum Work Order for Additional work for laying of DI pipe under Augmentation of Amritnagar Zone-I PWSS under RCFA Division-I PHE Dte. ORD/000985/2023-2024 473/RCD-I 12/02/2024 15 M/S SINGH & KONAR CONSTRUCTION 8.65 2.84 80
868 RCFA Division -I Acceptance cum work order for Construction of spout, repairing and restoration of pipe line, FHTC connection and allied land development works within distribution system under Malladihi OHR under Augmentation of Itapara PWSS under RCFA Division-I PHE Dte. ORD/000986/2023-2024 469/RCD-1 12/02/2024 15 ASHA CONSTRUCTION 7.18 6.99 100
869 RCFA Division -I Acceptance cum work order Construction of stand post on emergency basis at Rupnarayanpur, Rangamati area of Rupnarayanpur Zone under 4 Nos. retrofitting PWSS under RCFA Division-I PHE Dte. ORD/000987/2022-2023 1266/RCD-1 27/03/2023 15 B.B. CONSTRUCTION 2.80 2.78 0
870 RCFA Division -I Acceptance cum Work Order for Balance work for laying of different dia HDPE pipe line (left out portion) and other allied works at Amritnagar (Part-A) under Augmentation of Amritnagar Zone-I under RCFA Division-I PHE Dte ORD/000991/2023-2024 481/RCD-I 12/02/2024 45 M/S SINGH & KONAR CONSTRUCTION 45.53 32.24 80
871 RCFA Division -I Continuation work order for Sinking of 6 (Six) nos 200 mm dia river bed tube well including collecting main in the river of Damodar at Surjanagar under Source Augmentation of RCFA Part-II Water Supply Scheme by installing Riverbed Tube-well under RCFA Division-I PHE Dte. ORD/000994/2023-2024 295/A/RCD-I 06/02/2024 30 MAK CONSTRUCTION CO 22.57 17.67 100
872 RCFA Division -I Continuation of work order for Conducting route survey, design rising main network and preparation & submission of source Augmentation DPR for Ukhra OHR of RCFA (Part-I) PWSS. ORD/001008/2023-2024 3523-A/RCD-I 04/12/2023 15 SIRCON ENGINEERING SERVICES 4.97 4.97 100
873 RCFA Division -I Continuation of work order for Conducting route survey , design rising main network and preparation & submission of source augmentation DPR for Itapara PWSS for Impementation of JJM at Barabani block under RCFA DIVISION-I P.H.E. Dte. ORD/001009/2023-2024 74/A/RCD-I 02/01/2024 15 RISHAN ENGINEERING CONSULTANCY 4.97 4.97 100
874 RCFA Division -I Continuation work order for Conducting route survey, design rising main network and preparation & submission of source augmentation DPR for Improvement of Collector well by infiltration gallery at Kalajharia Part-II W/S Scheme ORD/001011/2023-2024 3523-B/RCD-I 04/12/2023 15 SIRCON ENGINEERING SERVICES 4.97 4.97 100
875 RCFA Division -I Continuation work order for Conducting route survey, design rising main network and preparation & submission of source augmentation DPR for Madanpur OHR of RCFA (Part-I) PWSS under RCFA DIVISION-I , P.H.E Dte. ORD/001012/2023-2024 3523-C/RCD-I 04/12/2023 15 SIRCON ENGINEERING SERVICES 4.97 4.97 100
876 RCFA Division -I Formal work order for creating separate zone for Amlajora, supplying, laying of HDPE distribution pipeline and other allied works at Sarpi, Repairing of existing cement concrete road restoration and other allied works (Part- A & B), construction of 5.40 X 3.6 meter switch room including additional concreting of exition dismantled road after extension of pipeline and retrofitting of existing distribution system under RBT Sarpi PWSS, Augmentation of Gopalpur & Bistupur PWSS and Amlajora PWSS under RCFA Division-I PHE Dte. ORD/001013/2023-2024 548/RCD-I 20/02/2024 599 HIRANMAY GHOSH 200.38 59.65 40
877 RCFA Division -I Formal work order for sinking of 02(two) nos TW. FHTC,laying Rising main & laying distribution system(LDS) construction of boundary wall, pump house and restoration of road & and other allied works for Augmentation of ground water based W/S scheme for Basudha under RCFA Division-I, PHE Dte. Block-Kanksa, Dist- Paschim Bardhaman, ORD/001015/2023-2024 559/RCD-I 21/02/2024 130 MRITYUNJOY MUKHERJEE & CO. 209.86 164.50 90
878 RCFA Division -I Acceptance cum Work Order for Emergent dismantling of RCC Elevated Reservoir capacity 682 cum staging height 20 meter at Mohishila OHR within Asansol Municipal Corporation area of Augmentation PWSS of RCFA Part-II (Zone-8) under RCFA Division-I PHE Dte. ORD/001018/2023-2024 519/RCD-I 16/02/2024 45 GITA CONSTRUCTION 17.37 17.35 100
879 RCFA Division -I Acceptance cum work order for Additional Supplying aligning laying HDPE pipe Mechanical fitting supplying sluice valve and other allied works at (Mouza-Sahenganj) under Zone-16 Part-II W/S Scheme under RCFA Division-I PHE Dte. ORD/001019/2023-2024 572/RCD-I 23/02/2024 30 KRISHNA KUMAR TODI HUF 36.45 36.45 100
880 RCFA Division -I Laying of 110 mm dia HDPE pipeline including pushing of 600 mm dia RCC (NP3) hume pipe by adopting trench less technology at Health World Hospital, Asansol Paschim Bardhaman under RCFA Division-I PHE Dte. Extension work. ORD/001020/2023-2024 Camp-02_Health_World_AE-I 21/02/2024 20 M/S CHANDI CHARAN ROY 18.54 18.06 100
881 RCFA Division -I Acceptance cum work order for Supply & Delivery of GI pipe including loading , unloading and carriage to Searsole store under RCFA Part-II PWSS under RCFA Division-I PHE Dte. ORD/001022/2023-2024 626/RCD-I 27/02/2024 20 MAKALI ENGINEERING CORPORATION 93.69 93.69 100
882 RCFA Division -I Acceptance cum work order for Additional supplying, Laying & Aligning of HDPE pipe, including providing FHTC retrofitting (left out portion) at Ratibati village under Augmentation PWSS of RCFA Part-II (Zone-7) under RCFA Division-I PHE Dte. ORD/001023/2023-2024 622/RCD-I 27/02/2024 15 M/S KALYAN ENTERPRISE 4.09 4.09 100
883 RCFA Division -I Trial run and special Maintenance of Rising main and Distribution system with operating of valve within command area under Augmentation of Telipara PWSS, JJM under RCFA Division-I PHE Dte. 6 (Six) Months ORD/001028/2023-2024 684_RCD-1 29/02/2024 184 MALLICK ENTERPRISE 1.64 0.00 0
884 RCFA Division -I Formal work order for creating separate zone for Adibasipara near WTP Panagarh, supplying, laying of 160 mm dia HDPE distribution pipe line and other allied works at Anandapur, Repairing of existing cement concrete road restoration and other allied works (Part- A & B), at Bistupur and Dannay. Mohal & Sinking of 2 Nos 300 X 200 MM dia RBT tube well at Silampur under Augmentation of Kanksha (Zone-I & II), Augmentation of RCFA Part-III (Zone-II), Augmentation of ground water based water supply scheme Napara under RCFA Division-I, PHE Dte. ORD/001024/2023-2024 662/RCD-I 29/02/2024 90 SARASWATI ENTERPRISE 119.89 105.01 100
885 RCFA Division -I Acceptance cum work order for Trial run and special Maintenance of Rising main and Distribution system with operating of valve within command area under Augmentation of Kanksa Zone-II (Part-D) PWSS, JJM under RCFA Division-I PHE Dte. 6 (Six) Months ORD/001033/2023-2024 688/RCD-1 29/02/2024 184 AMARANJALI CONSTRUCTION 1.79 0.00 0
886 RCFA Division -I Acceptance cum work order for Supply & Delivery of GI pipe including loading, unloading and carriage to Searsole Store under RCFA Part-II PWSS under RCFA Division-I PHE Dte. ORD/001034/2023-2024 713/RCD-I 29/02/2024 20 NEZONE TUBES LIMITED 95.53 95.49 100
887 RCFA Division -I Formal work order for Laying of Distribution System to Accommodate FHTC and Providing FHTC including Supplying laying, fitting, fixing of 15 mm NB PVC (Schedule 80) 20 mm OD HDPE (PE 100, PN 6) pipe with all necessary specials, saddle piece etc. all complete for Augmentation of Sub-Surface Water Based Piped Water Supply Scheme for Amritnagar Zone-II under RCFA Division-I PHE Dte. ORD/001036/2022-2023 2455./RCD-I 02/11/2022 180 MACHINO TECHNO 130.76 104.24 90
888 RCFA Division -I Formal work order for construction of CWR 150 cum, sub station building of H/W site, pump house, chlorine room and other allied work (Bank of Ajoy river) under Semalya Water Supply Scheme under RCFA Division-I PHE Dte. ORD/001037/2022-2023 1216_1_RCD-I 24/03/2023 120 SHILPA UDDOYG ENGINEERING CO-OP SOCIETY LTD. 72.59 0.00 0
889 RCFA Division -I Addition work for Laying of HDPE pipeine and Providing Functional House Hold Tap Connection (FHTC) in connection with Jal Jeevan Mission at of Arra Mouza JL No 89 Under command area of Augumentation of Napara piped W/S Scheme,under D.W.S.D., P.H.E. Dte. ORD/001039/2022-2023 327/DWSD 20/02/2023 35 DARPAN DAS & CO 70.42 66.42 75
890 RCFA Division -I Addition work for Laying of HDPE pipeine and Providing Functional House Hold Tap Connection (FHTC) in connection with Jal Jeevan Mission at of Arra Mouza JL No 89 Under command area of AUGMENTATION OF GROUND WATER BASED WATER SUPPLY SCHEME FOR AMLAJORA PART - II, UNDER DURGAPUR W/S DIVISION , BLOCK : KANKSA, DISTRICT : PASCHIM BARDDHAMAN ORD/001040/2022-2023 326/DWSD 20/02/2023 30 BISHAL ENTERPRISE 81.29 81.06 100
891 RCFA Division -I Continuation work order for Renovation of filter bed, changing of Media and allied works at Salanpur Dalmia OCP Project under RCFA Division-I PHE Dte. ORD/001070/2023-2024 101_A_RCD-I 09/01/2024 15 R B ENTERPRISE 7.46 0.00 0
892 RCFA Division -I Formal work order for Laying distribution system including FHTC for 5 (Two) nos uncovered village viz. Namokeshia and Jorbari within Salanpur Block under Augmentation of RCFA Part-II (zone-10) PWSS under RCFA Division-I PHE Dte. ORD/001074/2023-2024 806/RCD-I 13/03/2024 90 UMA ENTERPRISE 107.86 0.00 0
893 RCFA Division -I Formal work order for Acceptance order for Sinking of 02 (Two) no.s TW, FHTC, Laying Rising main & laying distribution system(LDS) construction of boundary wall, Pump House and restoration of road & other allied works for Augmentation of ground water based Bamunara PWSS under RCFA Division-I, PHE Dte. ORD/001079/2023-2024 809/RCD-I 14/03/2024 413 RANJIB GHATAK 91.37 0.00 90
894 RCFA Division -I Continuation work order for Supplying, fitting, fixing and fabrication of sign board including printing and carriage to different area with necessary allied works in connection with Improvement of RCFA Part-I Piped Water Supply Scheme under RCFA Division-I PHE Dte. ORD/001080/2023-2024 2382_A_RCD_I 07/08/2023 20 UNITED CONSTRUCTION 17.51 17.08 100
895 RCFA Division -I Acceptance cum Work Order for Additional work for raising height of tube well to encounter flood including surging of tube well, repairing work of collecting main at river Ajoy at Churulia under Augmentation of Itapara Piped Water Supply Scheme under RCFA Division-I PHE Dte. ORD/001087/2023-2024 876/RCD-I 15/03/2024 15 MD AAMIR KHAN 4.09 0.00 100
896 RCFA Division -I Acceptance cum Work Order for Additional work for Shifting of 450 mm dia Rising main for ECL Railway siding near Dalmia OCP for extension of Bonjemari Colliery under Improvement of RCFA Part-II Zone-8 under RCFA Division-I PHE Dte. ORD/001108/2023-2024 913/RCD-I 15/03/2024 45 MD AAMIR KHAN 43.51 42.65 100
897 RCFA Division -I Acceptance cum Work Order for Additional work for Laying of Rising main including allied works of for extension of Bonjemary Colliery and ECL Railway siding under Improvement of RCFA Part-II Zone-8 under RCFA Division-I PHE Dte. ORD/001109/2023-2024 914/RCD-I 15/03/2024 45 MD AAMIR KHAN 38.46 38.42 100
898 RCFA Division -I Acceptance cum Work Order for Additional work for concrete cutting, restoration of road and allied works Dakshin Khanda area under RCFA Part-II W/S Scheme PHE Dte. [Zone-1A] ORD/001111/2023-2024 917/RCD-I 15/03/2024 30 UNITED CONSTRUCTION 17.04 16.94 100
899 RCFA Division -I Acceptance cum Work Order for Laying of different dia HDPE pipeline Including other allied works at Khorabor, Rashunpur, Amuliya under Barabani Block of Jamgram Panuria PWSS under RCFA Div- I, PHE Dte. ORD/001112/2023-2024 918/RCD-I 15/03/2024 45 M/S B.K. CONSTRUCTION 15.73 0.00 0
900 RCFA Division -I Acceptance cum Work Order for Additional work for laying MS pipe and allied works including Adopting trench less technology (e.g. Jack Pushing Method etc) of 03 ( Three) Nos. location at Bankola Rail gate, Bankola Siding ECL & Bankola Water Supply Gate under Augmentation of RCFA Part-II Zone 19 PWSS under RCFA,Division-I,P.H.E.Dte. ORD/001113/2023-2024 919/RCD-I 15/03/2024 30 A CONSTRUCTION CO 42.40 42.34 100
901 RCFA Division -I Acceptance cum Work Order for Additional work for Construction of pillar, MS pipe, specials, GI Pipe and allied works within Zone-I near Dendua under Augmentation PWSS of RCFA Part-II (Zone-I) under RCFA Division-I PHE Dte ORD/001118/2023-2024 924/RCD-I 15/03/2024 45 SWATI CORPORATION 25.03 24.35 100
902 RCFA Division -I Acceptance cum Work Order for Interconnection at Baliapur OHR Site (02 nos. OHR), Barabani OHR and Barabani Railway crossing of RCFA Part-II Zone-19 PWSS under RCFA Division-I PHE Dte ORD/001119/2023-2024 925/RCD-I 15/03/2024 30 M/S MONDAL ENTERPRISE 22.75 22.33 100
903 RCFA Division -I Acceptance cum Work Order for Extension of Distribution Network for Improvement RCFA Part-I Water Supply Scheme within command area of Zone - XI (Part-8 Distribution Segment) under RCFA Division-I PHE Dte. ORD/001120/2023-2024 926/RCD-I 15/03/2024 20 SIMA ENTERPRISE 7.02 6.79 100
904 RCFA Division -I Acceptance cum Work Order for Balance work of Laying distribution system within distribution network for Augmentation of Jamgram PWSS under RCFA Div- I, PHE Dte. (Part-D) ORD/001121/2023-2024 927/RCD-I 15/03/2024 45 B.T.M. CONCERN 35.23 34.38 89
905 RCFA Division -I Acceptance cum Work Order for Construction of Pump House under at Kajora under Kajora OCP based PWSS under RCFA Division-I PHE Dte. ORD/001122/2023-2024 928/RCD-I 15/03/2024 90 MACHINO TECHNO 35.86 35.85 100
906 RCFA Division -I Acceptance cum Work Order for Additional work Distribution Network for Augmentation of RCFA Part-II (Zone-1) Piped Water Supply Scheme including FHTC & allied work under RCFA Division-I PHE Dte. (Part-C) ORD/001123/2023-2024 929/RCD-I 15/03/2024 45 UNITED CONSTRUCTION 32.03 24.47 100
907 RCFA Division -I Acceptance cum Work Order for Laying 200 mm dia MS water pipe line with 600 mm dia MS casing pipe for railway crossing in between Jamuria (JMA) and Barabani (BBI) at KM 25/2-3 in Asansol Division under JJM of Retrofitting of Bagdiha & adjoining mouzas for providing FHTC within Jamuria Block under RCFA Division-I PHE Dte. ORD/001124/2023-2024 931/RCD-I 15/03/2024 30 SOMNATH SAMANTA 23.15 22.61 100
908 RCFA Division -I Hiring of SUV (A.C) (Non Airconditioned) Bharat Stage-IV/BS-IV purchased on or after 01.01.2022 with Diesel/LPG/CNG Engine. for the Office Use of the Deputy Superintending Engineer, RCFA W/S Circle, Public Health Engineering Directorate, Govt. of West Bengal (w.e.f. 01.03.2024 to 31.08.2024) (Sl No. 02) ORD/001128/2023-2024 718C/RCD-I 01/03/2024 184 SHYAMAL MAJI 0.90 0.60 10
909 RCFA Division -I Wall writing IEC message along with logo picture etc. of multiple colour as will be supplied by the PHE Dte. on smooth durable wall surface preferably of Govt. premises boundary wall under RCFA Division-I PHE Dte. ORD/001164/2023-2024 Camp-02-Wall-Writing-AE-I 18/01/2024 30 MUKHERJEE TRADERS 6.61 6.59 100
910 RCFA Division -I Acceptance cum work order for Laying and Pushing by adopting trench less technology(e.g.Jack Pushing Method etc) at Kunustoria for Distribution Network for Augmentation of RCFA Part-II Piped Water Supply Scheme under RCFA Division-I.PHE Dte.(Zone-7) Segment-5 ORD/001165/2023-2024 1017/RCD-I 16/03/2024 15 B.T.M. CONCERN 22.80 21.52 100
911 RCFA Division -I Continuation work order for Probable Office expenditure of office of the Executive Engineer to meet up day to day various office & site expenses under RCFA div-I PHE Dte (w.e.f 01.08.2023 to 31.01.2024) ORD/001166/2023-2024 2319_RCD-I 31/07/2023 184 M/S KALYANI ENTERPRISE 4.49 0.00 0
912 RCFA Division -I Acceptance cum Work Order for Additional work for concrete cutting and concreting and distribution network for RCFA Part-II PWSS including FHTC and allied work under RCFA Division-I PHE Dte. Zone-12B (Segement 2) ORD/001170/2023-2024 1009/RCD-I 16/03/2024 15 M/S SINGH & KONAR CONSTRUCTION 31.75 0.00 0
913 RCFA Division -I Acceptance cum Work Order for Construction of RCC column and M.S Structural Bridge for laying of 200 m dia MS pipe and other allied work for distribution network for Improvement of RCFA Part-I water supply scheme within command area of Zone-VII under RCFA Division ¿I PHE Dte ORD/001172/2023-2024 1012/RCD-I 16/03/2024 30 UNITED CONSTRUCTION 6.54 6.47 100
914 RCFA Division -I Acceptance cum Work Order for Additional work for distribution network for Augmentation of RCFA Part-II Piped Water Supply Scheme within command area of Zone-9A(Segment-III) under RCFA Division-I. PHE Dte. ORD/001176/2023-2024 1016/RCD-I 16/03/2024 45 UNITED CONSTRUCTION 35.76 19.29 70
915 RCFA Division -I Acceptance cum Work Order for Balance work of distribution pipe line of Kanska Zone-II (Part-B)from OHR to Pathanpara under Augmentation of Birudiha W/S Scheme under RCFA Division-I PHE Dte. ORD/001178/2023-2024 1019/RCD-I 16/03/2024 45 MD AAMIR KHAN 35.40 35.37 100
916 RCFA Division -I Acceptance cum Work Order for Construction of Boundary wall and allied works at Krishnapur tube well No-02 under Augmentation of Krishnapur Piped water Supply scheme under Kanksa Block under RCFA Division-I,PHE Dte ORD/001188/2023-2024 1007/RCD-I 16/03/2024 30 MOTIONMASS TECHNO (OPC) PRIVATE LIMITED 7.12 5.54 80
917 RCFA Division -I Acceptance cum formal order for the work of Additional pipe line work with concrete cutting at Shilampur mouza for providing FHTC in connection with Jal Jeevan mission for Shilampur Mouza(JL90) under Augmentation of Napara Piped W/s Scheme at Kanksa block under DWSD, PHE Dte (SL-18) ORD/001189/2023-2024 1014/DWSD 12/07/2023 20 MUKHERJEE ENTERPRISE 96.46 0.00 0
918 RCFA Division -I Acceptance cum work order for Additional providing FHTC of retrofitting at kumardiha Village (left out portion) of Kumardiha Mouza, GP-Ratibati Block Raniganj of Ratibati Water supply scheme under RCFA Division-I PHE Dte. ORD/001206/2023-2024 1023/RCD-I 16/03/2024 30 SAYAN CONSTRUCTION 5.65 0.00 0
919 RCFA Division -I Acceptance cum work order for Laying and Pushing by adopting trench less technology(e.g.Jack Pushing Method etc), additional for Rising main and culvert crossing near Semlya Head Work Site under Jamuria Block under Augmentation of RCFA Part II Piped Water Supply Scheme Volume -I under RCFA Division I PHE Dte. ORD/001207/2023-2024 1010/RCD-I 16/03/2024 15 SILPO UDYOG ENGINEERING CONSTRUCTIONS 12.72 12.23 100
920 RCFA Division -I Acceptance cum formal order for the work of Supplying, laying and aligning of HDPE distribution pipe line and other allied works providing FHTC under command area Shyambazar under Augmentation Shyambazar piped water supply scheme , Block-Durgapur-Faridpur,Dist-Paschim Bardhhaman (SL-14) ORD/001210/2023-2024 795/DWSD 12/09/2023 30 MAJI DEVELOPERS 98.70 95.14 100
921 RCFA Division -I Acceptance cum work order for Additional work for the laying of Distribution Network for Improvement RCFA Part-I Water Supply Scheme within command area Zone-VII of Augmentation of RCFA Part-II (Zone-11) PWSS under RCFA Division-I PHE Dte. (Part-D) ORD/001215/2023-2024 935_RCD_I 15/03/2024 15 KONAR CONSTRUCTION 23.57 23.52 100
922 RCFA Division -I Construction of 5.40Mx 3.60M Swtich Room with Plinth Height (600mm to 2000mm) with Sanitary and water Supply arrangement at kanchanpur of kanksa block under Augmentation of Roopganj Piped W/S Scheme under DWSD PHE Dte. ORD/001227/2023-2024 1293/DWSD 07/08/2023 45 MAJI DEVELOPERS 6.09 6.09 100
923 RCFA Division -I Formal Work Order for Construction of 450 cum OHR, Laying, Aligning of DI (K9) Rising main (22 km) Pipe line and interconnection between rising main with OHR 2 nos House at Madhaiganj and Bhaburia H/W site and other allied works of RBTW water based water supply scheme for Sharpi and its adjoining areas to accommodate FHTC under Augmentation of Bistupur PWSS in Durgapur-Faridpur Block, Dist-Paschim Bardhaman under Durgapur W/S Division PHE Dte. ORD/001232/2023-2024 126_RCD_I 16/01/2024 834 GITA CONSTRUCTION 305.57 124.71 100
924 RCFA Division -I Construction of 5.40Mx 3.60M Swtich Room with Plinth Height (600mm to 2000mm) with Sanitary and water Supply arrangement at Kanksa Zone II/Part B under Augmentation of Bistupur Piped W/S Scheme. ORD/001233/2023-2024 1292/DWSD 07/08/2023 45 PRAKRITI CONSTRUCTION 6.02 6.02 100
925 RCFA Division -I Construction of 5.40Mx 3.60M Swtich Room with Plinth Height (600mm to 2000mm) with Sanitary and water Supply arrangement at Kanksa Zone II/Part C under Augmentation of Roopganj Piped W/S Scheme. ORD/001234/2023-2024 1277_DWSD 07/08/2023 45 PRADIP CHOUDHARY 5.83 5.83 100
926 RCFA Division -I Acceptance cum formal order for the work of construction of pump house cum chlorine room at Silampur pump house No-I H/W site for of Kanksa (Zone-I) Under Augmentation of Napara P piped W/s Scheme under DWSD,PHE Dt ORD/001236/2023-2024 1279_DWSD 07/08/2023 45 MUKHERJEE ENTERPRISE 6.41 6.41 100
927 RCFA Division -I Implememntation of Har Ghar Jal for Providing FHTC in connection with JJM for Pratapur, Nachan mouza ,Dhabani mouza (JL-48) underAUGMENTATION OF GROUND WATER BASED WATER SUPPLY SCHEME FOR AMLAJORA PART - II, UNDER DURGAPUR W/S DIVISION , BLOCK : KANKSA, DISTRICT : PASCHIM BARDDHAMAN ORD/001237/2023-2024 1074/DWSD 12/07/2023 20 MUKHERJEE ENTERPRISE 18.40 0.00 0
928 RCFA Division -I Material Requisition To Resource Division RTOR000001/2021-2022 2280/RCD-I 12/12/2021 0 Resource Division 20.23 0.00 0
929 RCFA Division -I Material Requisition To Resource Division RTOR000001/2024-2025 1178/RCD-I 03/04/2024 0 Resource Division 337.92 0.00 0
930 RCFA Division -I Material Requisition To Resource Division RTOR000002/2021-2022 2281/RCD-I 12/12/2021 0 Resource Division 10.17 0.00 0
931 RCFA Division -I Material Requisition To Resource Division RTOR000002/2023-2024 1637/RCD-I 27/04/2023 0 Resource Division 127.23 0.00 0
932 RCFA Division -I Material Requisition To Resource Division RTOR000002/2024-2025 1179/RCD-I 03/04/2024 0 Resource Division 37.47 0.00 0
933 RCFA Division -I Material Requisition To Resource Division RTOR000003/2021-2022 2283 12/12/2021 0 Resource Division 18.59 0.00 0
934 RCFA Division -I Material Requisition To Resource Division RTOR000003/2023-2024 1638/RCD-I 27/04/2023 0 Resource Division 30.48 0.00 0
935 RCFA Division -I Material Requisition To Resource Division RTOR000004/2023-2024 1639/RCD-I 27/04/2023 0 Resource Division 45.72 0.00 0
936 RCFA Division -I Material Requisition To Resource Division RTOR000005/2021-2022 301/RCD-I 02/02/2022 0 Resource Division 676.57 0.00 0
937 RCFA Division -I Material Requisition To Resource Division RTOR000005/2022-2023 2345/RCD-I 28/09/2022 0 Resource Division 9.24 0.00 0
938 RCFA Division -I Material Requisition To Resource Division RTOR000005/2023-2024 1854/RCD-I 31/05/2023 0 Resource Division 7.25 0.00 0
939 RCFA Division -I Material Requisition To Resource Division RTOR000006/2021-2022 392/RCD-I 16/02/2022 0 Resource Division 2,340.25 0.00 0
940 RCFA Division -I Material Requisition To Resource Division RTOR000006/2022-2023 2346/RCD-I 28/09/2022 0 Resource Division 30.80 0.00 0
941 RCFA Division -I Material Requisition To Resource Division RTOR000006/2023-2024 1857/RCD-I 31/05/2023 0 Resource Division 1.76 0.00 0
942 RCFA Division -I Material Requisition To Resource Division RTOR000007/2021-2022 438/RCD-I 21/02/2022 0 Resource Division 8.25 0.00 0
943 RCFA Division -I Material Requisition To Resource Division RTOR000007/2022-2023 2347/RCD-I 28/09/2022 0 Resource Division 21.56 0.00 0
944 RCFA Division -I Material Requisition To Resource Division RTOR000008/2021-2022 437/RCD-I 21/02/2022 0 Resource Division 2.75 0.00 0
945 RCFA Division -I Material Requisition To Resource Division RTOR000008/2022-2023 2352/RCD-I 28/09/2022 0 Resource Division 92.40 0.00 0
946 RCFA Division -I Material Requisition To Resource Division RTOR000009/2021-2022 439/RCD-I 21/02/2022 0 Resource Division 11.00 0.00 0
947 RCFA Division -I Material Requisition To Resource Division RTOR000009/2022-2023 2349/RCD-I 28/09/2022 0 Resource Division 12.32 0.00 0
948 RCFA Division -I Material Requisition To Resource Division RTOR000009/2023-2024 2029/RCD-I 30/06/2023 0 Resource Division 127.95 0.00 0
949 RCFA Division -I Material Requisition To Resource Division RTOR000010/2022-2023 2350/RCD-I 28/09/2022 0 Resource Division 12.32 0.00 0
950 RCFA Division -I Material Requisition To Resource Division RTOR000011/2021-2022 677/RCD-I 21/03/2022 0 Resource Division 57.29 0.00 0
951 RCFA Division -I Material Requisition To Resource Division RTOR000011/2022-2023 2351/RCD-I 28/09/2022 0 Resource Division 12.32 0.00 0
952 RCFA Division -I Material Requisition To Resource Division RTOR000011/2023-2024 2207/RCD-I 17/07/2023 0 Resource Division 160.38 0.00 0
953 RCFA Division -I Material Requisition To Resource Division RTOR000012/2023-2024 2206/RCD-I 17/07/2023 0 Resource Division 24.19 0.00 0
954 RCFA Division -I Material Requisition To Resource Division RTOR000013/2021-2022 696/RCD-I 23/03/2022 0 Resource Division 92.44 0.00 0
955 RCFA Division -I Material Requisition To Resource Division RTOR000013/2022-2023 2644/RCD-I 28/10/2022 0 Resource Division 64.50 0.00 0
956 RCFA Division -I Material Requisition To Resource Division RTOR000013/2023-2024 2933/RCD-I 11/10/2023 0 Resource Division 6.78 0.00 0
957 RCFA Division -I Material Requisition To Resource Division RTOR000014/2022-2023 2925/RCD-I 17/11/2022 0 Resource Division 356.25 0.00 0
958 RCFA Division -I Material Requisition To Resource Division RTOR000014/2023-2024 2934/RCD-I 11/10/2023 0 Resource Division 6.78 0.00 0
959 RCFA Division -I Material Requisition To Resource Division RTOR000015/2022-2023 2626/RCD-I 17/11/2022 0 Resource Division 27.66 0.00 0
960 RCFA Division -I Material Requisition To Resource Division RTOR000015/2023-2024 2935/RCD-I 11/10/2023 0 Resource Division 6.78 0.00 0
961 RCFA Division -I Material Requisition To Resource Division RTOR000016/2022-2023 2927/RCD-I 17/11/2022 0 Resource Division 85.11 0.00 0
962 RCFA Division -I Material Requisition To Resource Division RTOR000016/2023-2024 2936/RCD-I 11/10/2023 0 Resource Division 6.78 0.00 0
963 RCFA Division -I Material Requisition To Resource Division RTOR000017/2022-2023 3132 09/12/2022 0 Resource Division 40.44 0.00 0
964 RCFA Division -I Material Requisition To Resource Division RTOR000017/2023-2024 2958/RCD-I 11/10/2023 0 Resource Division 6.78 0.00 0
965 RCFA Division -I Material Requisition To Resource Division RTOR000018/2022-2023 3131 09/12/2022 0 Resource Division 106.94 0.00 0
966 RCFA Division -I Material Requisition To Resource Division RTOR000018/2023-2024 2956/RCD-I 11/10/2023 0 Resource Division 6.78 0.00 0
967 RCFA Division -I Material Requisition To Resource Division RTOR000019/2022-2023 3125 09/12/2022 0 Resource Division 220.25 0.00 0
968 RCFA Division -I Material Requisition To Resource Division RTOR000019/2023-2024 2954/RCD-I 11/10/2023 0 Resource Division 6.78 0.00 0
969 RCFA Division -I Material Requisition To Resource Division RTOR000020/2023-2024 2952/RCD-I 11/10/2023 0 Resource Division 6.78 0.00 0
970 RCFA Division -I Material Requisition To Resource Division RTOR000021/2022-2023 3126 09/12/2022 0 Resource Division 86.94 0.00 0
971 RCFA Division -I Material Requisition To Resource Division RTOR000021/2023-2024 2950/RCD-I 11/10/2023 0 Resource Division 6.78 0.00 0
972 RCFA Division -I Material Requisition To Resource Division RTOR000022/2022-2023 3129 09/12/2022 0 Resource Division 60.34 0.00 0
973 RCFA Division -I Material Requisition To Resource Division RTOR000022/2023-2024 2948/RCD-I 11/10/2023 0 Resource Division 6.78 0.00 0
974 RCFA Division -I Material Requisition To Resource Division RTOR000023/2022-2023 3130 09/12/2022 0 Resource Division 12.90 0.00 0
975 RCFA Division -I Material Requisition To Resource Division RTOR000023/2023-2024 2949/RCD-I 11/10/2023 0 Resource Division 6.78 0.00 0
976 RCFA Division -I Material Requisition To Resource Division RTOR000024/2022-2023 3127 09/12/2022 0 Resource Division 178.46 0.00 0
977 RCFA Division -I Material Requisition To Resource Division RTOR000024/2023-2024 2951/RCD-I 11/10/2023 0 Resource Division 6.78 0.00 0
978 RCFA Division -I Material Requisition To Resource Division RTOR000025/2023-2024 2953/RCD-I 11/10/2023 0 Resource Division 6.78 0.00 0
979 RCFA Division -I Material Requisition To Resource Division RTOR000026/2023-2024 2955/RCD-I 11/10/2023 0 Resource Division 6.78 0.00 0
980 RCFA Division -I Material Requisition To Resource Division RTOR000027/2023-2024 2947/RCD-I 11/10/2023 0 Resource Division 6.78 0.00 0
981 RCFA Division -I Material Requisition To Resource Division RTOR000028/2022-2023 19/RCD-I 05/01/2023 0 Resource Division 121.92 0.00 0
982 RCFA Division -I Material Requisition To Resource Division RTOR000028/2023-2024 2946/RCD-I 11/10/2023 0 Resource Division 6.78 0.00 0
983 RCFA Division -I Material Requisition To Resource Division RTOR000029/2022-2023 28/RCD-I 10/01/2023 0 Resource Division 92.01 0.00 0
984 RCFA Division -I Material Requisition To Resource Division RTOR000029/2023-2024 2945/RCD-I 11/10/2023 0 Resource Division 6.78 0.00 0
985 RCFA Division -I Material Requisition To Resource Division RTOR000030/2022-2023 54/RCD-I 11/01/2023 0 Resource Division 180.92 0.00 0
986 RCFA Division -I Material Requisition To Resource Division RTOR000030/2023-2024 2944/RCD-I 11/10/2023 0 Resource Division 6.78 0.00 0
987 RCFA Division -I Material Requisition To Resource Division RTOR000031/2022-2023 106/RCD-I 20/01/2023 0 Resource Division 159.09 0.00 0
988 RCFA Division -I Material Requisition To Resource Division RTOR000031/2023-2024 2943/RCD-I 11/10/2023 0 Resource Division 6.78 0.00 0
989 RCFA Division -I Material Requisition To Resource Division RTOR000032/2022-2023 121/RCD-I 24/01/2023 0 Resource Division 222.41 0.00 0
990 RCFA Division -I Material Requisition To Resource Division RTOR000032/2023-2024 2942/RCD-I 11/10/2023 0 Resource Division 6.78 0.00 0
991 RCFA Division -I Material Requisition To Resource Division RTOR000033/2023-2024 2941/RCD-I 11/10/2023 0 Resource Division 6.78 0.00 0
992 RCFA Division -I Material Requisition To Resource Division RTOR000034/2023-2024 2940/RCD-I 11/10/2023 0 Resource Division 6.78 0.00 0
993 RCFA Division -I Material Requisition To Resource Division RTOR000035/2023-2024 2939/RCD-I 11/10/2023 0 Resource Division 6.78 0.00 0
994 RCFA Division -I Material Requisition To Resource Division RTOR000036/2023-2024 2938/RCD-I 11/10/2023 0 Resource Division 6.78 0.00 0
995 RCFA Division -I Material Requisition To Resource Division RTOR000037/2023-2024 2937/RCD-I 11/10/2023 0 Resource Division 6.78 0.00 0
996 RCFA Division -I Material Requisition To Resource Division RTOR000038/2023-2024 2957/RCD-I 11/10/2023 0 Resource Division 6.78 0.00 0
997 RCFA Division -I Material Requisition To Resource Division RTOR000039/2023-2024 2980/RCD-I 12/10/2023 0 Resource Division 5,756.61 0.00 0
998 RCFA Division -I Material Requisition To Resource Division RTOR000041/2023-2024 3662/RCD-I 28/12/2023 0 Resource Division 35.15 0.00 0
999 RCFA Division -I Material Requisition To Resource Division RTOR000042/2023-2024 106/RCD-I 10/01/2024 0 Resource Division 308.00 0.00 0
1000 RCFA Division -I Material Requisition To Resource Division RTOR000043/2023-2024 134/RCD-I 18/01/2024 0 Resource Division 130.63 0.00 0
1001 RCFA Division -I Payment for sample PT test bill no 376/21-22 dt. 25.06.2021 VCH/000011/2022-2023 545/22-23 01/11/2022 0 GREEN ECONOMY INITIATIVES PRIVATE LIMITED 0.01 0.00 0
1002 RCFA Division -I Repairing of 6 (Six) nos panel board, panel board wiring, Supply and installation of 10 HP submersible pump & motor & cable laying & other allied works at Ratibati river bed pump house site of Ratibati W/S Scheme under RCFA Division-I PHE Dte. (Sl No. 02) VCH/000069/2022-2023 172/22-23 13/06/2022 0 M/S PIONEER CONSTRUCTION 4.67 0.00 0
1003 RCFA Division -I Hire charges bill for vehicle no WB 37 D 0482 for the month of March 2022 VCH/000121/2022-2023 518/22-23 29/09/2022 0 SHYAMAL MAJI 0.19 0.00 0
1004 RCFA Division -I Submission of Quarterly regular return for non-salary 26Q3 & 26Q4 Regular Return for Salary 24Q3 & 24Q4 for the F.Y 2021-2022 and creation of Form 16 Part A & B 26Q2 for the F.Y 202021-22 Revised return for non salary return for the quarter 26Q3 & 26Q4 for the financial 2021-22 includes GST return for the month of April 2021 to March 2022 and April 2022 to May 2022 VCH/000366/2022-2023 383/22-23 17/08/2022 0 SHRESTHA & ASSOCIATES 0.58 0.00 0
1005 RCFA Division -I Payment for furniture VCH/000668/2022-2023 433/22-23 21/09/2022 0 VYAS & CO. 2.35 0.00 0
1006 RCFA Division -I Providing FHTC through retrofitting at Dhandardihi Mouza, vill-Madanpur, Block -Andal of Dhandadihi Water supply scheme under RCFA Div-I PHE Dte. VCH/000832/2020-2021 45/21-22 15/07/2021 0 MACHINO TECHNO 25.79 0.00 0
1007 Durgapur W/S Division Replacement of damaged PCC pole with allied work. BILL/00032/2023-2024 BP-2023-24-24 17/05/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED 1.69 0.00 0
1008 Durgapur W/S Division Quotation money for new electric connection for Augmentation of ground water based water supply scheme for Banagarm part under Durgapur W/s Division, PHE Dte,Block -Kanksa,Dist-Paschim Bardhaman. BILL/00038/2023-2024 BP-2023-24-25 18/05/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED 2.87 0.00 0
1009 Durgapur W/S Division New service connection charges for Dandeswar piped Water supply scheme TW-I BILL/00062/2023-2024 BP-2023-24-37 01/06/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED 0.62 0.00 0
1010 Durgapur W/S Division Quotation money for new electric service connection at Birudiha under Birudiha piped W/s Scheme. BILL/00063/2023-2024 BP-2023-24-38 01/06/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED 0.29 0.00 0
1011 Durgapur W/S Division New service connection charges for jatgoria piped W/s Scheme BILL/00082/2023-2024 BP-2023-24-54 08/06/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED 8.22 0.00 0
1012 Durgapur W/S Division New service connection charges for jatgoria water supply scheme TW-2 BILL/00083/2023-2024 BP-2023-24-55 08/06/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED 0.17 0.00 0
1013 Durgapur W/S Division New service connection charges for birudiha Water Supply scheme (TW-2) BILL/00148/2023-2024 BP-2023-24-89 17/07/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED 2.27 0.00 0
1014 Durgapur W/S Division Electricity service connection rupganj piped W/s Scheme BILL/00153/2023-2024 BP-2023-24-94 24/07/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED 2.95 0.00 0
1015 Durgapur W/S Division Service charges for new electricity connection at BamunnaraH/W site under Bamunara piped W/S Scheme BILL/00154/2023-2024 BP-2023-24-95 24/07/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED 2.76 0.00 0
1016 Durgapur W/S Division Electricity Service connection for Bamunnara TW-II H/W site under Bamunnara piped W/s Scheme BILL/00155/2023-2024 BP-2023-24-96 24/07/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED 2.35 0.00 0
1017 Durgapur W/S Division Electricity service connection for Amlajora H/W site under Amlajora piped W/s Scheme BILL/00156/2023-2024 BP-2023-24-97 24/07/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED 0.68 0.00 0
1018 Durgapur W/S Division Electricity service connection charges for Amlajora H/W Site TW-II under Amlajora Piped W/s Scheme BILL/00157/2023-2024 BP-2023-24-98 24/07/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED 1.52 0.00 0
1019 Durgapur W/S Division Electricity service charges for Kanchanpur TW-III under Kanksa block of Dandeswar piped W/s Scheme BILL/00158/2023-2024 BP-2023-24-99 24/07/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED 2.67 0.00 0
1020 Durgapur W/S Division Electricity service charges for Dandeswar TW-II under Dandeswar piped W/s Scheme BILL/00159/2023-2024 BP-2023-24-100 24/07/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED 2.83 0.00 0
1021 Durgapur W/S Division Quotation money for electrification service charges for Kanksa Zone-II/Part-B TW-I BILL/00161/2023-2024 BP-2023-24-101 24/07/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED 2.56 0.00 0
1022 Durgapur W/S Division Electricity connection quotation fees for Kanksa Zone-II Part-B TW-2 BILL/00162/2023-2024 BP-2023-24-102 24/07/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED 4.01 0.00 0
1023 Durgapur W/S Division Service connection quotation money for Kanksa Zone- Part-B TW-3 BILL/00163/2023-2024 BP-2023-24-103 24/07/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED 2.13 0.00 0
1024 Durgapur W/S Division Electricity service connection charges for Kanksa Zone-II Part-A TW-1 BILL/00164/2023-2024 BP-2023-24-104 24/07/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED 6.04 0.00 0
1025 Durgapur W/S Division Electricity charges for installation of service connection for Kanksa Zone-II Part-A TW-II BILL/00165/2023-2024 BP-2023-24-105 25/07/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED 2.87 0.00 0
1026 Durgapur W/S Division Quotation money for service connection Kanksa Zone-II Part-A TW-III BILL/00166/2023-2024 BP-2023-24-106 24/07/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED 6.99 0.00 0
1027 Durgapur W/S Division Road restoration at Panagarh Silampur Road (ch 2.5 KM to 3.5 KM) to be executed by Executive Engineer, Asansol Highway Division, PWD Roads directorate for the work of repairing of damaged at Panagarh Silampur BILL/00176/2022-2023 BP-2022-23-333 15/03/2023 0 EXECUTIVE ENGINEER , ASANSOL HIGHWAY DIVISION, PWD ROADS 18.00 0.00 0
1028 Durgapur W/S Division Quotation for Napara W/S Scheme, P.H. No - 1, Gopalpur CCC BILL/00177/2022-2023 BP-2022-23-329 15/03/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED 7.02 0.00 0
1029 Durgapur W/S Division Quotation for Napara W/S Scheme, P.H. No - 02, Gopalpur CCC BILL/00178/2022-2023 BP-2022-23-330 15/03/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED 4.80 0.00 0
1030 Durgapur W/S Division Quotation for Shyambazar W/S Scheme, P.H. No - 02, Panagarh CCC BILL/00179/2022-2023 BP-2022-23-331 15/03/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED 2.36 0.00 0
1031 Durgapur W/S Division Quotation for Garadaha W/S Scheme, P.H. No - 01, Panagarh CCC BILL/00180/2022-2023 BP-2022-23-328 15/03/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED 5.75 0.00 0
1032 Durgapur W/S Division Quotation for Garkilla Kherobari W/S Scheme, P.H. No - 01, Gopalpur CCC BILL/00181/2022-2023 BP-2022-23-332 15/03/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED 2.80 0.00 0
1033 Durgapur W/S Division Quotation for Dhobaru W/S Scheme , Pump House No- 01 , Panagarh CCC BILL/00204/2022-2023 BP-2022-23-335 17/03/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED 4.47 0.00 0
1034 Durgapur W/S Division Quotation for Telipara W/S Scheme , Pump House No- 01 , Panagarh CCC BILL/00205/2022-2023 BP-2022-23-337 17/03/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED 10.45 0.00 0
1035 Durgapur W/S Division Road restoration with demand of fund for different road stretches within Bistupur under Augmentation of Bistupur piped W/s Scheme under Durgapur W/S Division, PHE Dte BILL/00205/2023-2024 BP-2023-24-114 28/07/2023 0 EXECUTIVE ENGINEER , ASANSOL HIGHWAY DIVISION, PWD ROADS 28.83 0.00 0
1036 Durgapur W/S Division Quotation for Telipara W/S Scheme , Pump House No- 02 , Panagarh CCC BILL/00206/2022-2023 BP-2022-23-338 17/03/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED 4.13 0.00 0
1037 Durgapur W/S Division Quotation for Kotalpukur W/S Scheme , Pump House No- 01 , Panagarh CCC BILL/00207/2022-2023 BP-2022-23-339 17/03/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED 5.47 0.00 0
1038 Durgapur W/S Division Quotation for Shyambazar W/S Scheme , Pump House No- 01 , Panagarh CCC BILL/00208/2022-2023 BP-2022-23-340 17/03/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED 3.65 0.00 0
1039 Durgapur W/S Division BILL/00242/2023-2024 BP-2023-24-121 07/08/2023 0 P C FORMS & STATIONERY 0.19 0.00 0
1040 Durgapur W/S Division Road restoration at Panagarh Silampur Road (ch 2.5 KM to 3.5 KM) to be executed by Executive Engineer, Asansol Highway Division, PWD Roads directorate for the work of repairing of damaged at Panagarh Silampur BILL/00441/2023-2024 BP-2023-24-221 21/09/2023 0 EXECUTIVE ENGINEER , ASANSOL HIGHWAY DIVISION, PWD ROADS 17.96 0.00 0
1041 Durgapur W/S Division Additional quotation for effecting NSC under revised estimate for Dhobaru W/S Scheme BILL/00746/2023-2024 BP-2023-24-366 31/01/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED 2.76 0.00 0
1042 Durgapur W/S Division Quotation from WBSEDCL for new service connection for Shilampur under Augmentation of Amlajora PWSS ,Kaksa BILL/00757/2023-2024 BP-2023-24-367 31/01/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED 8.27 0.00 0
1043 Durgapur W/S Division Acceptance cum formal order for the work of Extension of pipe line from existing pipe line for providing FHTC in connection with JJM for Basudha mouza(JL-35(Part-B) under command area of Basudha W/s Scheme at Kanksa Block under DWSD, PHE Dte (SL-06) ORD/000001/2021-2022 715/DWSD 29/04/2021 20 S.S.CONSTRUCTION 4.98 9.97 0
1044 Durgapur W/S Division Formal order for the work of Laying and aligning of DI K9 rising main pipe line supplying DI Specials valves and other allied works at Madhabmat under command area of Augmentation of Kanksa (Zone-II/Part-A) piped W/s Scheme under DWSD, PHE Dte.(SL-01) ORD/000001/2022-2023 659/DWSD 22/04/2022 10 BASANTI TRADERS 10.58 8.45 100
1045 Durgapur W/S Division Acceptance cum formal order for the work of Constructions of 5.40 X 3.6 m switch room with plinth height (600 X 2000 mm ) with sanitary and water supply arrangement at Kataberia TW no -II of Kataberia piped W/s Scheme under DWSD PHE Dte (SL-11) ORD/000001/2023-2024 578/DWSD 10/04/2023 45 M/S MANDAL ENTERPRISE 6.84 6.84 100
1046 Durgapur W/S Division Formal order for the work of Sinking of 1 No 300X200 mm dia tube well ,210 mtr of depth by Direct Rotary method using PVC Pipe and Fiber Strainer reinforced epoxy slotted at Madhabmat Pump House No-1 under command area of Augmentation of Kanksa (Zone-II/Part-A) piped W/s Scheme under DWSD, PHE Dte.(SL-02) ORD/000002/2022-2023 660/DWSD 22/04/2022 10 RANJIB GHATAK 14.01 12.95 0
1047 Durgapur W/S Division Acceptance cum formal order for the work of Supplying laying and aligning of HDPE distribution pipe line and allied works including FHTC and connection providing to Khatgoria mouzas JL-29 (Part-B) under command area of Kataberia piped W/s Scheme under DWSD ,PHE Dte ORD/000002/2023-2024 580/DWSD 10/04/2023 40 SAIKAT RAY 96.67 76.26 100
1048 Durgapur W/S Division Formal order for the work of Sinking of 1 No 300X200 mm dia tube well ,210 mtr of depth by Direct Rotary method using PVC Pipe and Fiber Strainer reinforced epoxy slotted at Madhabmat Pump House No-2 under command area of Augmentation of Kanksa (Zone-II/Part-A) piped W/s Scheme under DWSD, PHE Dte. ORD/000003/2022-2023 653/DWSD 22/04/2022 10 JOY GURU ENTERPRISE 14.00 11.75 0
1049 Durgapur W/S Division Acceptance cum formal order for the work of Constructions of 5.40 X 3.6 m witch room with plinth height (600 X 2000 mm ) with sanitary and water supply arrangement at Kataberia TW no -I of Kataberia piped W/s Scheme under DWSD PHE Dte ORD/000003/2023-2024 581/DWSD 10/04/2023 45 MAJI DEVELOPERS 6.92 0.00 100
1050 Durgapur W/S Division Formal order for the work of Sinking of 1 No 300X200 mm dia tube well ,210 mtr of depth by Direct Rotary method using PVC Pipe and Fiber Strainer reinforced epoxy slotted at Madhabmat Pump House No-2 under command area of Augmentation of Kanksa (Zone-II/Part-A) piped W/s Scheme under DWSD, PHE Dte.(SL-04) ORD/000004/2022-2023 548/DWSD 08/04/2022 10 AHS R INFRA PRIVATE LIMITED 14.04 13.02 0
1051 Durgapur W/S Division Acceptance cum formal order for the work of Supplying laying and aligning of HDPE distribution and allied works including FHTC and connection providing to Paranganj mouzas JL-79 part-B under command area of Jemua Piped W/s Scheme under DWSD, PHE Dte. ORD/000004/2023-2024 584/DWSD 11/04/2023 30 M/S UNIQUE 31.10 22.90 80
1052 Durgapur W/S Division Acceptance cum formal order for the work of Extension of pipe line from existing pipe line for providing FHTC in connection with JJM for Basudha mouza(JL-35(Part-A) under command area of Basudha W/s Scheme at Kanksa Block under DWSD, PHE Dte(Sl-05) ORD/000005/2021-2022 718/DWSD 29/04/2021 25 M/S S. CHOUDHURY 4.85 9.72 0
1053 Durgapur W/S Division Formal order for the work of Construction of 500 M3 capacity, 20 mtr staging height Over Head Reservoir at Madhabmat Tube well No-1 Kanksa (Zone-II/Part-A) piped W/S Scheme under DWSD , PHE Dte (SL-05) ORD/000005/2022-2023 571/DWSD 12/04/2022 184 SAIKAT RAY 99.22 95.07 100
1054 Durgapur W/S Division Acceptance cum formal order for the work of Construction of boundary wall at Khatgoria of Kataberia piped W/s Scheme pump house -II under DWSD ,PHE Dte ORD/000005/2023-2024 585/DWSD 11/04/2023 45 SIL ENTERPRISE 14.80 14.74 100
1055 Durgapur W/S Division Acceptance cum formal order for the work of additional pipe line work with concrete cutting at Bansia mouza for providing functional house hold tap connection (FHTC) in connection with JJM for Bansia mouza (JL-31) under command area of Jamgora-Jaggannathpur W/s Scheme at Durgapur-Faridpur block under DWSD, PHE Dte. (SL-04) ORD/000006/2021-2022 719/DWSD 29/04/2021 25 BABA LOKENATH ENTERPRISE 4.99 9.94 0
1056 Durgapur W/S Division Formal order for the work of Supplying & laying of different dia HDPE pipe line with necessary allied works at Silampur mouza(JL-90) block -Kanksa under Augmentation of Kanksa (Zone-I) piped W/s Scheme under DWSD, PHE Dte (SL-01) ORD/000006/2022-2023 651/DWSD 22/04/2022 25 MD AAMIR KHAN 91.75 82.05 60
1057 Durgapur W/S Division Acceptance cum formal order for the work of Supplying ,laying and aligning of Hoped distribution pipe line and allied works including FHTC tap connection and connection & providing to Khatgoria Mouzas JL-29 (Part-C) under Command area of Kataberia pipe W/s Scheme under DWSD ,PHE Dte ORD/000006/2023-2024 586/DWSD 11/04/2023 45 TARA PRASAD SARKAR 94.91 80.73 80
1058 Durgapur W/S Division Formal order for the work of Supplying & laying of different dia HDPE pipe line with necessary allied works at Ayma Biswanathpur and Gangbil Mouza (JL-82/83) block -Kanksa under Augmentation of Kanksa (Zone-I) piped W/s Scheme under DWSD, PHE Dte (SL-02) ORD/000007/2022-2023 658/DWSD 22/04/2022 25 TARA PRASAD SARKAR 77.97 77.17 100
1059 Durgapur W/S Division Acceptance for the work of Supplying & aligning of HDPE distribution pipe line and allied works including Functional House Holds Tap connecting (FHTC ) and connection providing to Jamdoba Mouza-40 and Telipara Mouza- JL-41 of Telipara block -Kanksa under TELIPARA piped W/s Scheme under DWSD, PHE Dte (SL-03) ORD/000008/2022-2023 554/DWSD 11/04/2022 25 M/S SANTANU PALIT & CO. 127.01 0.00 0
1060 Durgapur W/S Division Formal order for the work of Construction of 750 M3 capacity 20 mtr Staging height RCC OHR with soil test 105 M3 CWR 35M3/Hr EIP and 250/200 DI K9 Rising main with necessary allied works at Ramnagar under Augmentation of RCFA Part-III(Zone-II) W/S Scheme under DWSD,PHE Dte (SL-01) ORD/000008/2023-2024 587/A/DWSD 12/04/2023 184 AMAR CONSTRUCTION 305.39 152.90 90
1061 Durgapur W/S Division Acceptance cum formal order for the work of Extension of pipe line of different dia UPVC pipe at Kalikapur mouza to combat draught like situation in Durgapur-Faridpur block to providing FHTC at Kalikapur mouza(JL-30) under Jamgora-Jagannathpur W/s Scheme under DWSD, PHE Dte (SL-08) ORD/000009/2021-2022 722/DWSD 29/04/2021 30 M/S MONDAL ENTERPRISE 4.99 0.00 0
1062 Durgapur W/S Division Formal order for the work of Supplying & aligning of HDPE distribution pipe line and allied works including Functional House Holds Tap connecting (FHTC ) and connection providing to Raghunathpur Mouza-39 and Paschim Gangarampur Mouza- JL-92 of Telipara block -Kanksa under TELIPARA piped W/s Scheme under DWSD, PHE Dte (Part-A) ORD/000009/2022-2023 642/DWSD 21/04/2022 25 M/S PROCHESTA ENTERPRISE 98.21 98.21 85
1063 Durgapur W/S Division Formal order for the work of Construction of Pump house cum Chlorine Room with Sanitary Plumbing arrangement at Jamdoba tube well No-1 or H/W Site of Telipara piped W/S Scheme under DWSD, PHE Dte (SL-05) ORD/000010/2022-2023 576/DWSD 13/04/2022 45 M/S KALYANI ENTERPRISE 6.21 6.21 100
1064 Durgapur W/S Division Formal order for the work of Construction of Pump house cum Chlorine Room with Sanitary Plumbing arrangement at Jamdoba tube well No-2 or H/W Site of Telepara piped W/S Scheme under DWSD, PHE Dte (SL-06) ORD/000011/2022-2023 641/DWSD 21/04/2022 45 MUKHERJEE ENTERPRISE 6.15 6.06 0
1065 Durgapur W/S Division Formal order for the work of Construction of 200 M3 capacity , 20 mtr staging height RCC Over head Reservoir (OHR) at Jamdoba of Telipara piped W/s Scheme under Durgapur W/S Division, PHE Dte (SL-07) ORD/000012/2022-2023 575/DWSD 13/04/2022 1506 M/S KALYANI ENTERPRISE 62.35 19.72 100
1066 Durgapur W/S Division Formal order for the work of Construction of 350 M3 capacity , 20 mtr staging height RCC Over head Reservoir (OHR) at Silampur Pump House No-1 of Augmentation of Kaksa piped W/s Scheme under Durgapur W/S Division, PHE Dte ORD/000013/2022-2023 652/DWSD 22/04/2022 184 MD AAMIR KHAN 83.27 74.24 85
1067 Durgapur W/S Division Acceptance cum formal order for the work of Laying and aligning of DI K9 rising main pipe line supplying DI specials ,valves and allied work at Kanchanpur and Kanksa under command area of Augmentation of Kanksa Zone-II/C piped W/s Scheme under DWSD ,PHE Dte ORD/000013/2023-2024 677/DWSD 03/05/2023 673 JOY GURU ENTERPRISE 29.76 28.62 100
1068 Durgapur W/S Division Acceptance cum formal order for the work of Construciton of 5.4 m X 3.60 m swtich room with plinth height (600 mm to 20000 mm ) with sanityary and water supply arrangment at Jemua tube well no -III site of retrofitting of Jemua Piped W/s Scheme under DWSD ,PHE Dte ORD/000014/2023-2024 678/DWSD 03/05/2023 30 SIL ENTERPRISE 6.92 6.92 100
1069 Durgapur W/S Division Acceptance cum formal order for the work of Approach road & others necessary allied works at Madhabmat front gate to village road for Kanksa Zone-II/A W/s Scheme under DWSD ,PHE Dte ORD/000015/2023-2024 679/DWSD 03/05/2023 45 SAIKAT RAY 28.31 27.40 100
1070 Durgapur W/S Division Acceptance cum formal order for the work of Sinking of 2 Nos 300X200 mm dia TW 210 mtr deep by DR rig mehtod using UPVC pipe CD and UPVC deep well screen (RDS) at Jemua H/W site and 1 No TW site of Faridpur block of retrofitting of Jemua piped W/s Scheme under DWSD ,PHE Dte ORD/000016/2023-2024 680/DWSD 03/05/2023 474 RANJIB GHATAK 31.43 30.86 100
1071 Durgapur W/S Division Formal order for the work of Balance work of supplying and laying of HDPE distribution system with construction of 02 Nos Pump house ,Construction of 350 M3 OHR of 20 mtr staging height as per Deptt drawing laying aligning of Rising main and providing of FHTC connection of all mouzas under command area of Augmentation of Napara piped W/s Scheme under DWSD ,PHE Dte . ORD/000018/2023-2024 712/DWSD 11/05/2023 60 SK. ALIM 307.16 264.06 100
1072 Durgapur W/S Division Formal order for the work of Balance work for supplying laying and aligning of HDPe distribution pipe line and allied works including FHTC and connection providing to Raghunathpur mouzas JL-39 and Paschim Gangarampur mouzas JL-92 of Augmentation of Telipara W/s Scheme under DWSD under DWSD ,PHE Dte (SL-15) ORD/000019/2023-2024 713/DWSD 11/05/2023 60 M/S PROCHESTA ENTERPRISE 171.21 145.60 100
1073 Durgapur W/S Division Continuation order for the work of Hiring of Luxury diesel Ambassador car including higher model -2012 on wards of diesel Ambassador or equivalent for official use of the Assistant Engineer of EE/DWSD/PHE Dte for the use of the Office of the EE/DWSD/PHE Dte ADDA Adm: Building EPIP Complex ,Banskopa ,Durgapur-713212(w.e.f 01.05.2023 to 31.10.2023) (Vehicle No-WB37D6848) ORD/000020/2023-2024 654/DWSD 27/04/2023 183 PRAMIT CHATTERJEE 0.82 2.36 100
1074 Durgapur W/S Division Formal order for the work of Balance work of construction of Pump house /Chlorine room sinking of 150X80 X120 mm depth tube well supplying laying of HDPE distribution pipe in and providing FHTC at Kotalpukur(JL-30) ,Nimtakuri(JL-30),Masna(JL-31) mouzas of Kotalpukur piped W/S scheme under DWSD,PHE Dte (SL-22) ORD/000021/2023-2024 733/DWSD 15/05/2023 535 JOY GURU ENTERPRISE 146.29 94.38 100
1075 Durgapur W/S Division Formal order for the work of Laying of 110/90/75 mm dia HDPE pipe line with necessary allied works at Annandapur mouza ICDS to Dompara under Kanksa (Zone-I ) W/s Scheme for upcoming combat draught like situation in Kanksa block under DWSD,PHE Dte (SL-04) ORD/000022/2021-2022 832/DWSD 24/05/2021 15 M/S KALYANI ENTERPRISE 5.12 0.74 0
1076 Durgapur W/S Division Formal order for the work of Balance work of construction of Pump house /Chlorine room sinking of 150X80 X120 mm depth tube well supplying laying of HDPE distribution pipe in and providing FHTC at Garkilla -Kherobari (JL-27),Gourangapur(JL-28) mouzas of Garkilla-Kherobari piped W/S scheme under DWSD,PHE Dte ORD/000022/2023-2024 735/DWSD 15/05/2023 60 BABA LOKENATH ENTERPRISE 104.15 103.23 85
1077 Durgapur W/S Division Formal order for the work of Balance work for providing FHTC in connection with JJM for Bansia mouza(JL-31) under command area of Jamgora-Jagannathpur W/s Scheme at Durgapur Faridpur Block under DWSD, PHE Dte (SL-05) ORD/000023/2021-2022 796/DWSD 12/05/2021 15 BABA LOKENATH ENTERPRISE 12.90 25.24 0
1078 Durgapur W/S Division Formal order for the work of Additional work for providing functional house hold Tap connection (FHTC) in connection with JJM for Kalikapur mouza(JL-30) under command area of Jamgora-Jagannathpur W/S Scheme under DWSD, PHE Dte (SL-06) ORD/000024/2021-2022 794/DWSD 12/05/2021 15 M/S MONDAL ENTERPRISE 11.05 22.53 0
1079 Durgapur W/S Division Formal order for the work of Repairing ,extension as well as replace of damage AC pipe line and allied works at Colony Bouri para ,Upper Bagdi para ,Adibasi para under Jamgora(Mouza-23) under command area of Jamgora-Jagannathpur W/s Scheme for combat upcoming drought like situation under DWSD, PHE Dte (SL-07) ORD/000025/2021-2022 829/DWSD 24/05/2021 10 RANJIB GHATAK 7.26 14.44 0
1080 Durgapur W/S Division Acceptance cum formal order for the work of Sinking of 2 Nos 300X200 mm dia TW 210 mtr deep by DR rig method using UPVC pipe CD and UPVC deep well screen (RDS) at Jemua H/W site and 1 No TW site of Faridpur block of retrofitting of Jemua piped W/s Scheme under DWSD ,PHE Dte (SL-19) ORD/000025/2023-2024 757/DWSD 19/05/2023 20 M/S BADAL GHOSH 31.47 22.07 100
1081 Durgapur W/S Division Acceptance cum formal order for the work of Replacement of existing pipe line at Nachan OHR to Protapur gram for Physical certification of HarGhar Jal in connection with JJM of Augmentation Gopalpur piped W/s Scheme under DWSD ,PHE Dte (SL-03) ORD/000026/2023-2024 758/DWSD 19/05/2023 20 GHOSH & ROY ENTERPRISE 9.66 9.64 100
1082 Durgapur W/S Division Formal order for the work of Laying of branch pipe line at Basudevpur ,Binodpur and Sashipur mouza with its adjoining area UPVC pipe of Kanchanpur W/s Scheme under DWSD, PHE Dte (SL-08) ORD/000027/2021-2022 834/DWSD 24/05/2021 15 T.M.CONCRETE CREATION PVT LTD 10.76 11.73 0
1083 Durgapur W/S Division Acceptance cum formal order for the work of supplying, laying and aligning of HDPE/CI/DI distribution pipe line and other allied works providing FHTC under command area of TETIKHOLA (Part-B) under Tetikhola piped water supply scheme , Block-Durgapur-Faridpur,Dist-Paschim Bardhhaman (SL-13) ORD/000027/2023-2024 762/DWSD 22/05/2023 35 JOY GURU ENTERPRISE 94.09 65.76 85
1084 Durgapur W/S Division Acceptance cum formal order for the work of Supplying, laying and aligning of HDPE distribution pipe line and other allied works providing FHTC under command area of TETIKHOLA (Part-C) under Tetikhola piped water supply scheme , Block-Durgapur-Faridpur,Dist-Paschim Bardhhaman (SL-14) ORD/000028/2023-2024 759/DWSD 19/05/2023 35 ANWESHA CONSTRUCTION 98.70 49.22 65
1085 Durgapur W/S Division Acceptance cum formal order for the work of supplying, laying and aligning of HDPE distribution pipe line and other allied works providing FHTC under command area of TETIKHOLA (Part-E) under Tetikhola piped water supply scheme , Block-Durgapur-Faridpur,Dist-Paschim Bardhhaman ORD/000029/2023-2024 761/DWSD 22/05/2023 35 SWATI CORPORATION 95.42 81.27 45
1086 Durgapur W/S Division Acceptance cum formal order for the work of supplying, laying and aligning of HDPE distribution pipe line and other allied works providing FHTC under command area of TETIKHOLA (Part-D) under Tetikhala piped water supply scheme , Block-Durgapur-Faridpur,Dist-Paschim Bardhhaman ORD/000030/2023-2024 763/DWSD 22/05/2023 35 PRAVAT SARKAR 98.69 33.51 40
1087 Durgapur W/S Division Acceptance cum formal order for the work of supplying, laying and aligning of HDPE distribution pipe line and other allied works providing FHTC under command area of TETIKHOLA (Part-F) under Tetikhala piped water supply scheme , Block-Durgapur-Faridpur,Dist-Paschim Bardhhaman ORD/000031/2023-2024 811/DWSD 29/05/2023 35 CHATTERJEE CONSTRUCTION 87.79 60.58 75
1088 Durgapur W/S Division Acceptance cum formal order for the work of supplying, laying and aligning of HDPE distribution pipe line and other allied works providing FHTC under command area of TETIKHOLA (Part-A) under Tetikhola piped water supply scheme , Block-Durgapur-Faridpur,Dist-Paschim Bardhhaman (SL-18) ORD/000032/2023-2024 810/DWSD 29/05/2023 35 BASANTI TRADERS 99.25 78.14 70
1089 Durgapur W/S Division Acceptance cum formal order for the work of Additional work for rest portion UPVC pipe line and FHTC at Benabandhi (JL-11) and Maheshpur(JL-12) mouza under Augmentaiton of RAFA Part-III Zone-I piped W/S Scheme under DWSD,PHE Dte ORD/000033/2023-2024 739/DWSD 22/05/2023 60 KIRON ENTERPRISE 51.72 48.44 100
1090 Durgapur W/S Division Acceptance cum formal order for the work of Emergency work of concreting of exiting dismantled road at ARRAH mouza of Augmentation of Roopganj piped W/s Scheme under DWSD,PHE Dte ORD/000036/2023-2024 742/DWSD 16/05/2023 15 M/S BADAL GHOSH 4.78 4.75 100
1091 Durgapur W/S Division Acceptance cum formal order for the work of Trail bore for sinking of 3(Three) Nos (300X200 mm dia ) big tube well of 210 mtr depth by DR method using UPVC pipe and UPVC deep well screen RDS at Kanksa (Zone-II) tube well site of Augmentation of Kanksa Zone-II/Part-B &C) piped W/S Scheme under DWSD,PHE Dte ORD/000037/2023-2024 771/DWSD 22/05/2023 15 JOY GURU ENTERPRISE 4.81 4.81 0
1092 Durgapur W/S Division Acceptance cum formal order for the work of Additional work at RCC O HR site at Silampur under Augmentation of Kanksa (Zone-I) Piped W/s Scheme under DWSD,PHE Dte ORD/000038/2023-2024 763/DWSD. 22/05/2023 20 MD AAMIR KHAN 6.88 2.84 80
1093 Durgapur W/S Division Acceptance cum formal order for the work of Electrical wiring and other allied works for modernization of Gopalpur for Laboratory NABL accreditation of sub-District Water Testing Lab at Kanksa of Augmentation of Kanksa (Zone-II/Part-C) piped W/s Scheme under DWSD,PHE Dte ORD/000039/2023-2024 764/DWSD 22/05/2023 15 BASANTI TRADERS 1.72 1.72 100
1094 Durgapur W/S Division Acceptance cum formal order for the work of Additional work at RCC OHR site at NUTANDANGA under Augmentation of RCFA Part-III (Zone-I) Piped W/s Scheme under DWSD,PHE Dte ORD/000041/2023-2024 766/DWSD 22/05/2023 15 M/S PROCHESTA ENTERPRISE 4.49 4.48 100
1095 Durgapur W/S Division Acceptance cum formal order for the work of Construction of latrine and boundary wall of pump house cum chlorine room and necessary allied works at Anandpur H/W site for Augmentation of Kanksa (Zone-I) piped W/s Scheme under DWSD, PHE Dte ORD/000043/2023-2024 767/DWSD 22/05/2023 15 CHANDAN HAZRA 6.76 6.56 100
1096 Durgapur W/S Division Acceptance cum formal order for the work of Balance work for water supply arrangement for 1(One) No SLWM center at Bargoria and burning ghat at Bargoria ,Block-Durgapur-Faridpur for having no electricity with solar power connection including pipe line works and other allied works under proposed piped W/S Scheme for Kataberia under DWSD,PHE Dte ORD/000044/2023-2024 770/DWSD 22/05/2023 30 BHUMIKA ENTERPRISE 7.46 7.46 0
1097 Durgapur W/S Division Acceptance cum formal order for the work of Concreting of exiting dismantled road of Augmentation of Gopalpur piped W/S Scheme under DWSD,PHE Dte (Part-A) ORD/000045/2023-2024 768/DWSD 22/05/2023 10 SAIKAT RAY 4.96 4.96 100
1098 Durgapur W/S Division Acceptance cum formal order for the work of Additional work for providing FHTC tap connection with JJM at Radhamohanpur mouza-36 and its adjoining area under command area of Basudha piped W/s Scheme under DWSD,PHE Dte (SL-02) ORD/000046/2022-2023 581/DWSD 21/04/2022 7 JOY GURU ENTERPRISE 4.77 4.83 0
1099 Durgapur W/S Division Acceptance cum formal order for the work of Emergent work of Concreting of exiting dismantled road of Augmentation of Roopganj piped W/S Scheme under DWSD,PHE Dte ORD/000046/2023-2024 769/DWSD 18/04/2023 10 M/S BADAL GHOSH 4.78 4.76 100
1100 Durgapur W/S Division Acceptance cum formal order for the work of Providing water supply of office of the deputy inspector General of Police group center at Radhamohanpur under Kanksa and Bonkati GP having with electricity but uncovered by PWSS under DWSD,PHE Dte (SL-03) ORD/000047/2022-2023 582/DWSD 21/04/2022 7 JOY GURU ENTERPRISE 2.12 2.12 0
1101 Durgapur W/S Division Acceptance cum formal order for the work of Concreting of exiting dismantled road of Augmentation of Gopalpur piped W/S Scheme under DWSD,PHE Dte (Part-B) ORD/000047/2023-2024 771/DWSD. 22/05/2023 10 GHOSH & ROY ENTERPRISE 4.83 4.83 100
1102 Durgapur W/S Division Acceptance cum formal order for the work of Trail bore for 2 Nos (300x200 mm dia) tube well by direct rotary method at Annandapur and Shilampur pump house at Kanksa (Zone-I) for Augmentation of ground water of Kanksa (Zone-I) piped W/s Scheme under DWSD, PHE Dte (SL-04) ORD/000048/2022-2023 583/DWSD 21/04/2022 7 RANJIB GHATAK 3.91 3.91 0
1103 Durgapur W/S Division Acceptance cum formal order for the work of Repairing of leakage bursting and chokage cleaning at Gopalpur distribution system & Its all command areas of Augmentation of Gopalpur piped W/s Scheme under DWSD ,PHE Dte (SL-07) ORD/000051/2022-2023 586/DWSD 21/04/2022 7 QUICK PAL SUPPLIERS 4.82 4.39 0
1104 Durgapur W/S Division Acceptance cum formal order for the work of Distribution of abandoned existing structure at Gopalpur H/W site and others Pump House site under Augmentation of Gopalpur W/s Scheme of DWSD,PHE Dte (SL-08) ORD/000052/2022-2023 587/DWSD 21/04/2022 7 CHATTERJEE CONSTRUCTION 2.16 2.07 0
1105 Durgapur W/S Division Acceptance cum formal order for the work of Additional work at RCC Over Head Reservoir (OHR) Site at Ramnagar H/W Site under Augmentation 0f RCFA, Pt- III , Zone- II Water Supply Scheme (JJM) under Durgapur Water Supply Division, P.H.E. Dte. (Sl- 01) ORD/000053/2023-2024 839/DWSD 05/06/2023 15 RANJIB GHATAK 0.95 0.00 0
1106 Durgapur W/S Division Acceptance cum formal order for the work of Urgent Repairing of 250 dia pipe line with necessary alid works at Nabaghanapur to Jhanjra Project Portion under Augmentation 0f RCFA ,Pt-III, Zone -I W/S Scheme (JJM) Under Durgapur Water Supply Division, P.H.E. Dte. (Sl-02) ORD/000054/2023-2024 838/DWSD 05/06/2023 15 RUBY CONSTRUCTION 0.75 0.00 100
1107 Durgapur W/S Division Acceptance cum formal order for the work of providing FHTC connection and connection providing to Jemua Mouza (JL-80) under Jemua piped W/S Scheme under DWSD,PHE Dte (SM/06274) (Part-A) ORD/000068/2023-2024 1065/DWSD 12/07/2023 25 B.M. SARKAR 9.67 0.00 0
1108 Durgapur W/S Division Acceptance cum formal order for the work of Providing FHTC work at Rangamati Mouza(JL-10) under Augmentation of RCFA Part-III(Zone-I) piped W/S Scheme under DWSD,PHE Dte (SM/11454) ORD/000069/2023-2024 1066/DWSD 12/07/2023 30 BASANTI TRADERS 18.67 11.68 50
1109 Durgapur W/S Division Additional work of supplying and laying of different dia HDPE pipe line with necessary allied works at Aymabiswanath ,Gangbill mouza(JL-82,83) block-Kanksa under Augmentation of Kanksa Zone-I piped W/S scheme under DWSD,PHE Dte (SM/10208) ORD/000070/2023-2024 1067/DWSD 12/07/2023 30 TARA PRASAD SARKAR 96.72 74.03 100
1110 Durgapur W/S Division Acceptance cum formal order for the work of providing FHTC connection and connection providing to Jemua Mouza (JL-80) under Jemua piped W/S Scheme under DWSD,PHE Dte (SM/06274)(Part-C) ORD/000071/2023-2024 1058/DWSD 12/07/2023 25 B.M. SARKAR 9.82 0.00 0
1111 Durgapur W/S Division Balance work for installation of solar pumping machineries including solar pannel and other allied works for 6 Nos ICDS/AWC/School at Labnapara Bouripara,Pratabpur ICDS ,Jamgora Nichupara Bagdipara,Pratabpur Bus stands and pangar FP school ICDS and Kailashpur 52 ICDS under providng running water supply to ICDS/School ,HCF and other Public Ins of Kanksa and Durgapur-Faridpur Block under Retrofitting of Jemua Piped W/S Scheme. ORD/000072/2023-2024 1059/DWSD 12/07/2023 30 JOY GURU ENTERPRISE 19.40 0.00 0
1112 Durgapur W/S Division Sinking of 2 (Two) Nos 300X200X210 m depth by Direct reverse rotary method using UPVC pipe (CD) deep well screen (RDS) at Kataberia H/W site TW No-I site of Durgapur-Faridpur Block under PROPOSED GROUND WATER BASED WATER SUPPLY SCHEME FOR KATABERA, UNDER DURGAPUR W/S DIVISION , BLOCK : FARIDPUR-DURGAPUR, DISTRICT : PASCHIM BARDDHAMAM(SM/16249) ORD/000073/2023-2024 1072/DWSD 12/07/2023 30 KIRON ENTERPRISE 29.66 28.23 60
1113 Durgapur W/S Division Formal order for the work of --Providing functional household tap connection (FHTC) in connection with JAL JEEBAN MISSION(JIM) for RUPGANGANJ mouza (JL-54)under command area of Rupganj W/s Scheme Kanksa Block under Durgapur W/S Division, PHE Dte.(Sl-02) ORD/000074/2020-2021 1355/DWSD 09/12/2020 45 M/S KALYANI ENTERPRISE 13.97 28.47 0
1114 Durgapur W/S Division Acceptance cum formal order for the work of providing FHTC connection and connection providing to Jemua Mouza (JL-80) under Jemua piped W/S Scheme under DWSD,PHE Dte (SM/06274) (Part-B) ORD/000074/2023-2024 1068/DWSD 12/07/2023 20 ASHA CONSTRUCTION 10.50 0.00 100
1115 Durgapur W/S Division Formal work- order for the work of ----Providing functional household tap connection (FHTC) in connection with JAL JEEBAN MISSION(JIM) for Basudebpur mouza (JL-5)under command area of Kanchanpur W/s Scheme Kanksa Block under Durgapur W/S Division, PHE Dte.(SL-03) ORD/000075/2020-2021 930/DWSD 22/09/2020 45 MACHINO TECHNO 15.79 26.46 0
1116 Durgapur W/S Division Dismantling of concrete road and bitumunious road for balance work of laying distribution system ,RM construction of 250 M3 OHR including soil investigation ,construction of Pump house (5.40X3.60 with sanitary and water supply arrangment etc of pump house (3.6X3m) for Amlajora W/s scheme of DWSD,PHE Dte(SM/11937) ORD/000075/2023-2024 1070/DWSD 12/07/2023 20 RANADHIR SINHA 28.91 28.90 100
1117 Durgapur W/S Division Formal order for the work of --Providing functional household tap connection (FHTC) in connection with JAL JEEBAN MISSION(JIM) for Shilampur mouza (JL-90)under command area of Kanksa Zone-I W/s Scheme Kanksa Block under Durgapur W/S Division, PHE Dte.(SL-06) ORD/000076/2020-2021 932/DWSD 25/09/2020 45 MD AAMIR KHAN 43.86 98.38 0
1118 Durgapur W/S Division Acceptance cum formal order for the work of providing FHTC in connection with JJM for Jemua mouza (JL-80) under Retrofitting of Jemua piped W/s Scheme of Durgapur-Faridpur Block (SM/16249) (Part-D) ORD/000076/2023-2024 1071/DWSD 12/07/2023 25 KIRON ENTERPRISE 9.93 7.63 70
1119 Durgapur W/S Division Acceptance cum formal order for the work of additional work for providing FHTC in connection with JJM for Nachan Mouza(JL-47) under Retrofitting of Jemua piped W/s Scheme under DWSD,PHE Dte (SM/13685) ORD/000077/2023-2024 1064/DWSD 12/07/2023 25 M/S MONDAL ENTERPRISE 14.55 13.65 100
1120 Durgapur W/S Division Additional work of supplying and laying of different dia HDPE distribution pipe line and allied works under command area of Augmentation of Bistupur piped W/S scheme under DWSD,PHE Dte (SM/08877) ORD/000079/2023-2024 1079/DWSD 12/07/2023 30 MRITYUNJOY MUKHERJEE AND CO 9.90 9.75 99
1121 Durgapur W/S Division Additional work of supplying and laying of different dia HDPE distribution pipe line and allied works under command area of Augmentation of Bistupur piped W/S scheme under DWSD,PHE Dte (SM/08877) (Part-B) ORD/000080/2023-2024 1078/DWSD 12/07/2023 20 MRITYUNJOY MUKHERJEE AND CO 9.91 9.86 99
1122 Durgapur W/S Division Additional work of supplying and laying of different dia HDPE pipe line with necessary allied works at Silampur(JL-90) block-Kanksa under Augmentation of Kanksa Zone-I piped W/S scheme under DWSD,PHE Dte (SM/10208) ORD/000081/2023-2024 1077/DWSD 12/07/2023 35 MAK CONSTRUCTION CO. 96.46 45.30 45
1123 Durgapur W/S Division Laying and aligining rising main pipe line supplying DI Specials valves and other allied works at Amlajora of Augmentation of Amlajora piped W/s Scheme (SM/11937) ORD/000082/2023-2024 1075/DWSD 12/07/2023 30 RANADHIR SINHA 35.91 34.69 100
1124 Durgapur W/S Division Emergent work of concreting of exiting dismantalled road at Roopganj under Augmentation of Roopganj piped W/s Scheme (SM/10203) ORD/000083/2023-2024 1076/DWSD 12/07/2023 25 CHATTERJEE CONSTRUCTION 4.69 0.00 0
1125 Durgapur W/S Division Additioinal work for rest portion UPVC pipe line at Rangamati mouza under Augmentation of RCFA Part-III(Zone-I) piped W/S Scheme under DWSD,PHE Dte (SM/11454) ORD/000084/2023-2024 1073/DWSD 12/07/2023 25 BASANTI TRADERS 9.56 6.54 100
1126 Durgapur W/S Division Replacement of existing pipe line at Nachan OHR to Bansia gram for Physical certification of Har Ghar Jal in connection with JJM of Augmentation Roopganj piped W/s Scheme under DWSD ,PHE Dte ORD/000086/2023-2024 719/DWSD 11/05/2023 25 CHANDAN HAZRA 23.76 23.59 100
1127 Durgapur W/S Division Dismantling of concrete road and bituminiou road and land development for constrution of 250 M3 OHR of 20 mtr staging height as per Deptt drawing ,laying alingining of rising main and provding FHTC connection of all mouzas under command area of Birudiha piped W/s Scheme under DWSD ,PHE Dte ORD/000087/2023-2024 722/DWSD 11/05/2023 25 M/S K.B.CONSTRUCTION 30.05 29.88 100
1128 Durgapur W/S Division Construction of boundary wall at railpar Saroda Pally head works site pump house No-III WT_3 for Augmentation of Kanksa (Zone-I) piped W/s Scheme under DWSD ,PHE Dte ORD/000088/2023-2024 721/DWSD 11/05/2023 25 CHATTERJEE CONSTRUCTION 14.80 9.48 100
1129 Durgapur W/S Division Balance work for laying and alinging of DI K9 rising main pipe line supplying DI specials valves andallied works under command area of Bistupur piped W/s Scheme under DWSD ,PHE Dte ORD/000089/2023-2024 720/DWSD 11/05/2023 30 MAK CONSTRUCTION CO. 21.57 19.05 100
1130 Durgapur W/S Division Construction of 100 M3 capacity Clear Water Reservoir (CWR) at Bhaburia H/W Site under RBTW water based water supply scheme for Sharpi and its adjoining areas to accommodate FHTC in Durgapur-Faridpur block ,Dist-Paschim Bardhaman. ORD/000090/2023-2024 1094/DWSD 14/07/2023 60 KALPANA BUILDERS 32.52 32.10 100
1131 Durgapur W/S Division Acceptance cum formal order for the work of Extension of pipe line from existing pipe line Kanksa zone -II (Ph-II) W/s Scheme to combat draught like situation in Kaksa block to providing FHTC at Debipur mouza(JL-87)(Part-F) under DWSD,PHE Dte (SL-11). ORD/000091/2021-2022 1103/DWSD 30/07/2021 15 MANAS KUMAR SAHA 4.85 9.70 0
1132 Durgapur W/S Division Acceptance cum formal order for the work of Supplying and laying of 200 mm dia UPVC pipe line from Hetedoba OHR to Zero point towards SARPI more road of Improvement of Jamgora-Jagannathpur piped W/s Scheme under DWSD, PHE Dte (SL-06) ORD/000091/2022-2023 723/DWSD 06/05/2022 15 BABA LOKENATH ENTERPRISE 30.27 30.27 0
1133 Durgapur W/S Division Sinking of 2Nos 200 mm dia River bed tube well with collecting main with manifold in river "AJOY" at Bhaburia H/W Site under RBTW water based water supply scheme for Sharpi and its adjoining areas to accommodate FHTC in Durgapur-Faridpur block ,Dist.-Paschim Bardhhaman.(Part-A) ORD/000091/2023-2024 1095/DWSD 14/07/2023 30 CHANDAN HAZRA 18.32 14.90 82
1134 Durgapur W/S Division Acceptance cum formal order for the work of Extension of pipe line from existing pipe line Kanksa zone -II (Ph-II) W/s Scheme to combat draught like situation in Kaksa block to providing FHTC at Panagarh mouza(JL-85) of Pal para,Hazra bera,Kumar para ,near Tilakchandrpaur Panchayat near Panagarh bypass under DWSD,PHE Dte (SL-12) ORD/000092/2021-2022 1104/DWSD 30/07/2021 15 GITA CONSTRUCTION 4.98 4.98 0
1135 Durgapur W/S Division Supplying,laying and alingining of HDPE distribution pipe line and other allied works under command area of SARPI piped W/S system under RBTW water based water supply scheme for Sharpi and its adjoining areas to accommodate FHTC in Durgapur-Faridpur block ,Dist-Paschim Bardhaman.(Part-C). ORD/000092/2023-2024 1096/DWSD 14/07/2023 749 SILPO UDYOG ENGINEERING CONSTRUCTIONS 93.43 23.12 70
1136 Durgapur W/S Division Acceptance cum formal work-order for the work of replacement of AC pipe line with UPVC pipe line at Mollapara More to Kansa Gangulipara under Kanksa W/S Scheme under DWSD, PHE Dte (SL-07) ORD/000093/2020-2021 918/DWSD 22/09/2020 20 RANJIB GHATAK 4.85 9.86 0
1137 Durgapur W/S Division Acceptance cum formal order for the work of Extension of pipe line from existing pipe line Kanksa zone -II (Ph-II) W/s Scheme to combat draught like situation in Kaksa block to providing FHTC at Kanksa mouza(JL-89) at Kanksa Jhinuk Garia and Kanksa Hotal para under DWSD,PHE Dte (SL-13) ORD/000093/2021-2022 1105/DWSD 30/07/2021 15 GITA CONSTRUCTION 4.82 4.82 0
1138 Durgapur W/S Division Supplying,laying and alingining of HDPE distribution pipe line and other allied works under command area of SARPI piped W/S system under RBTW water based water supply scheme for Sharpi and its adjoining areas to accommodate FHTC in Durgapur-Faridpur block ,Dist-Paschim Bardhaman.(Part-B). ORD/000093/2023-2024 1098/DWSD 14/07/2023 30 UNITED CONSTRUCTION 93.32 66.94 45
1139 Durgapur W/S Division Acceptance cum form order for the work of Extension of pipe line from existing pipe line Kanksa zone -II (Ph-II) W/s Scheme to combat draught like situation in Kaksa block to providing FHTC at Kanksa mouza(JL-89) at Kanksa Duck Bunglow and Kanksa colony para under DWSD,PHE Dte (SL-14) ORD/000094/2021-2022 1106/DWSD 30/07/2021 15 GITA CONSTRUCTION 4.98 4.98 0
1140 Durgapur W/S Division Supplying,laying and alingining of HDPE distribution pipe line and other allied works under command area of SARPI piped W/S system under RBTW water based water supply scheme for Sharpi and its adjoining areas to accommodate FHTC in Durgapur-Faridpur block ,Dist-Paschim Bardhaman.(Part-F). ORD/000094/2023-2024 1099/DWSD 14/07/2023 30 M/S BADAL GHOSH 99.72 65.25 100
1141 Durgapur W/S Division Acceptance cum formal order for the work of Extension of pipe line from existing pipe line Kanksa zone -II (Ph-II) W/s Scheme to combat draught like situation in Kaksa block to providing FHTC at Kanksa mouza(JL-89) at Kanksa Adibashipara and Kanksa 3 No colony under DWSD,PHE Dte (SL-15) ORD/000095/2021-2022 1107/DWSD 30/07/2021 15 GITA CONSTRUCTION 4.89 4.89 0
1142 Durgapur W/S Division Continuation order for the work of Hiring of Luxury diesel Ambassador car including higher model -2012 on wards of diesel Ambassador or equivalent for official use of the Assistant Engineer of EE/DWSD/PHE Dte for the use of the Office of the EE/DWSD/PHE Dte ADDA Adm: Building EPIP Complex ,Banskopa ,Durgapur-713212(w.e.f 01.05.2022 to 30.04.2023) (Vehicle No-WB37D6848) ORD/000095/2022-2023 687/DWSD 28/04/2022 365 PRAMIT CHATTERJEE 1.65 4.36 0
1143 Durgapur W/S Division Supplying, laying and aligning of HDPE distribution pipe line and other allied works under command area of SARPI piped W/S system under RBTW water based water supply scheme for Sharpi and its adjoining areas to accommodate FHTC in Durgapur-Faridpur block ,Dist.-Paschim Bardhhaman.(Part-A) ORD/000095/2023-2024 1100/DWSD 14/07/2023 30 A CONSTRUCTION CO. 98.78 41.19 42
1144 Durgapur W/S Division Supplying, laying and aligning of HDPE distribution pipe line and other allied works under command area of SARPI piped W/S system under RBTW water based water supply scheme for Sharpi and its adjoining areas to accommodate FHTC in Durgapur-Faridpur block ,Dist.-Paschim Bardhhaman.(Part-E). ORD/000096/2023-2024 1101/DWSD 14/07/2023 658 KALPANA BUILDERS 99.89 0.00 65
1145 Durgapur W/S Division Formal order for the work of Supplying & aligning of HDPE distribution pipe line and allied works including Functional House Holds Tap connectin (FHTC ) and connection providing to Jamdoba Mouza-40 and Telipara Mouza- JL-41 of Telipara block -Kanksa under TELIPARA piped W/s Scheme under DWSD, PHE Dte (SL-03) ORD/000097/2022-2023 648/DWSD 21/04/2022 25 M/S SANTANU PALIT & CO. 127.01 105.55 75
1146 Durgapur W/S Division Supplying, laying and aligning of HDPE distribution pipe line and other allied works under command area of SARPI piped W/S system under RBTW water based water supply scheme for Sharpi and its adjoining areas to accommodate FHTC in Durgapur-Faridpur block ,Dist.-Paschim Bardhhaman.(Part-G). ORD/000097/2023-2024 1102/DWSD 14/07/2023 840 HIRANMAY GHOSH 97.54 43.97 80
1147 Durgapur W/S Division Formal order for the work of Construction of 400 M3 capacity ,20 mtr staging height of RCC OHR for Kanksa Zone-II/Part-D piped W/s Scheme under DWSD,PHE Dte(SL-03) ORD/000098/2022-2023 788/DWSD 18/05/2022 184 RANJIB GHATAK 88.59 0.00 0
1148 Durgapur W/S Division Sinking of 3 Nos 200 mm dia River bed tube well with collecting main with manifold in river "AJOY" at Bhaburia H/W Site under RBTW water based water supply scheme for Sharpi and its adjoining areas to accommodate FHTC in Durgapur-Faridpur block ,Dist.-Paschim Bardhhaman.(Part-B) ORD/000098/2023-2024 1103/DWSD 14/07/2023 35 MAK CONSTRUCTION CO. 27.48 27.44 100
1149 Durgapur W/S Division Acceptance cum formal order for the work of Extension of pipe line from exisitn pipe line Kanksa (Zone-II (Ph-II) W/s Scheme to combat draught like situation in Kanksa block to providing FHTC at Kanksa mouza (JL_89) under DWSD ,PHE Dte at Poral para,Khadra para under DWSD,PHE Dte (SL-19) ORD/000099/2021-2022 1111/DWSD 30/07/2021 15 SWATI CORPARATION 4.95 10.06 0
1150 Durgapur W/S Division Formal order for the work of Sinking of 1 No Tube well 250 mm X 150 mm big dia Tube well 150 mtr deapth direct rotary rig method using PVC pipe & fiber glass rein forced epoxy resin slotted TW No-1 Part-A site at Shilampur Pump house under Kanksa block (Zone-I) for Kanksa piped W/s Scheme (Zone-I) under DWSD, PHE Dte (SL-11) ORD/000099/2022-2023 748/DWSD 10/05/2022 10 RANJIB GHATAK 10.68 10.67 0
1151 Durgapur W/S Division Sinking of 2Nos 200 mm dia River bed tube well with collecting main with manifold in river AJOY at Bhaburia H/W Site under RBTW water based water supply scheme for Sharpi and its adjoining areas to accommodate FHTC in Durgapur-Faridpur block ,Dist.-Paschim Bardhhaman.(Part-C) ORD/000099/2023-2024 1104/DWSD 14/07/2023 30 MAITO MAA ENTERPRISE 18.32 10.96 100
1152 Durgapur W/S Division Formal order for the work of Laying and aligning of DI K9 rising main pipe line supplying DI specials ,valves and allied works at Akandara covering Jemua and Paranganj area under Augmentation of Kanksa (Zone-II/Part-B) piped W/s Scheme under DWSD, PHE Dte (SL-02) ORD/000100/2022-2023 765/DWSD 13/05/2022 15 AMAR CONSTRUCTION 70.22 66.50 0
1153 Durgapur W/S Division Sinking of 3 Nos 200 mm dia River bed tube well with collecting main with manifold in river "AJOY" at Bhaburia H/W Site under RBTW water based water supply scheme for Sharpi and its adjoining areas to accommodate FHTC in Durgapur-Faridpur block ,Dist.-Paschim Bardhhaman.(Part-A) ORD/000100/2023-2024 1105/DWSD 14/07/2023 35 BISHAL ENTERPRISE 27.47 23.76 90
1154 Durgapur W/S Division Formal order for the work of Additional work for providing functional houehold tap connection (FHTC) in connection with JJM at Bonsol Mouza(JL_49) ,Block-Durgapur-Faridpur ,Dist-Paschim Bardhaman under Gourbazar-Ichhapur W/s Scheme of Durgapur W/s Division, PHE Dte.(SL-01) ORD/000101/2021-2022 1272/DWSD 02/09/2021 60 JOY GURU ENTERPRISE 22.47 22.45 0
1155 Durgapur W/S Division Formal order for the work of Laying and aligning of DI K9 rising main pipe line supplying DI specials ,valves and allied work under command area of Kanksa under Augmentation of Kanksa (Zone-II/Part-D) piped W/s Scheme under DWSD, PHE Dte (SL-04) ORD/000101/2022-2023 751/DWSD 11/05/2022 7 CHATTERJEE CONSTRUCTION 9.77 1.88 0
1156 Durgapur W/S Division Construction of boundary wall at Railpar Saroda Pally H/W site pump house no-2/TW-II for Augmentation of Kanksa Zone-I) piped W/s Scheme under DWSD ,PHE Dte . ORD/000101/2023-2024 1106/DWSD 14/07/2023 40 MUKHERJEE ENTERPRISE 14.79 9.46 100
1157 Durgapur W/S Division Formal for the work of Providing functional household tap connection (FHTC) in connection with JJM at Shyamsundarpur Mouza(JL_07) ,Block-Durgapur-Faridpur ,Dist-Paschim Bardhaman under Gourbazar-Ichhapur W/s Scheme of Durgapur W/s Division, PHE Dte.(Part-C) (SL-03) ORD/000102/2021-2022 1254/DWSD 27/08/2021 60 PRAVAT SARKAR 27.33 27.30 0
1158 Durgapur W/S Division Formal order for the work of Supplying, laying and aligning of 160 mm dia HDPE distribution pipe line and allied works at Railpar Saradapally of Prayagpur mouza under command areas under Augmentation of Kanksa (Zone-II/Part-D) piped W/s Scheme under DWSD, PHE Dte (SL-05) ORD/000102/2022-2023 752/DWSD 11/05/2022 15 SAIKAT RAY 16.19 16.06 0
1159 Durgapur W/S Division Continuation order for the work of Hiring of LUXURY Diesel Ambassador Car including higher model 2012 onwards of Diesel Ambassador or equivalent for official use (Inspection Vehicle for site vigit against JJM related scheme) for the office of the Executive Engineer ,Durgapur Water Supply Division, Public Health Engineering (w.e.f 01.07.2023 to 31.12.2023).(Sl-01) ORD/000102/2023-2024 944/DWSD 28/06/2023 183 PRAMIT CHATTERJEE 0.82 2.38 100
1160 Durgapur W/S Division Formal order for the work of Additional work for providing functional house hold tap connection (FHTC) in connection with JJM at Tilakchandrapur Mouza(JL_63) & Sundiara(JL-67),Block-Kanksa ,Dist.-Paschim Bardhaman under Tilakchandrapur W/s Scheme of Durgapur W/s Division, PHE Dte.(SL-05) ORD/000103/2021-2022 1229/DWSD 23/08/2021 45 S K ALIM 15.03 15.01 0
1161 Durgapur W/S Division Formal order for the work of Laying and aligning of DI K9 rising main pipe line supplying DI specials ,valves and other allied works under Telipara piped W/s Scheme of DWSD,PHE Dte (SL-06) ORD/000103/2022-2023 786/DWSD 18/05/2022 10 M/S MONDAL ENTERPRISE 14.09 12.59 0
1162 Durgapur W/S Division Formal order for the work of Replace of damaged AC pipe line with HDPE pipe from Kanksa under pass towards Kanksa PS of Kanksa (Zone-II & Ph-II) W/S Scheme under DWSD,PHE Dte (SL-06) ORD/000104/2021-2022 1374/DWSD 17/09/2021 20 SWATI CORPARATION 9.71 19.78 0
1163 Durgapur W/S Division Formal order for the work of Dismantling of existing boundary wall and reconstruction of balance portion boundary wall at Gopalpur H/W site (OHR) site of Augmentation of Gopalpur piped W/s Scheme under DWSD ,PHE Dte (SL-09) ORD/000104/2022-2023 750/DWSD 10/05/2022 10 D. S. ENTERPRISE 29.41 29.22 0
1164 Durgapur W/S Division Formal order for the work of Balance work of construction of Pump house /Chlorine room sinking of 150X80 X120 mm depth tube well supplying laying of HDPE distribution pipe in and providing FHTC at Dhobaru mouzas of Dhobaru piped W/S scheme under DWSD,PHE Dte ORD/000104/2023-2024 1133/DWSD 20/07/2023 30 SILPO UDYOG ENGINEERING CONSTRUCTIONS 109.55 70.62 80
1165 Durgapur W/S Division Acceptance cum formal order for the work of Surging of 03 Nos river bed tube wells (No - 3,4,5 Ext) to combat drought like situation at Pansuili head work site under Augmentation of RCFA,Part-III (Zone-I) W/S Scheme (JJM) under Durgapur Water Supply Division , PHE Dte. (Sl-01) ORD/000105/2023-2024 04/SPOT/DWSD 16/06/2023 4 KARMAKAR CONSTRUCTION 1.00 1.00 100
1166 Durgapur W/S Division Acceptance order for the work of Additional work for providing functional household tap connection (FHTC) in connection with JJM at Ichhapur Mouza ,Block-Durgapur-Faridpur ,Dist-Paschim Bardhaman under Gourbazar-Ichhapur W/s Scheme of Durgapur W/s Division, PHE Dte.(SL-08) ORD/000106/2021-2022 1195/DWSD 11/08/2021 60 SHWET BARANI 22.71 22.74 0
1167 Durgapur W/S Division Acceptance cum formal order for the work of creating a separate zone for BAMUNNARA of Bamunara piped W/S Scheme with construction of Pump house /Chlorine room Sin king of 1500 mm X 80 mm X 150 mtr deep Tube well & supplying laying of HDPE distribution pipe line and providing FHTC at Amlajora (64), Gopalpur(CT)(65) Mouza under Augmentation of BAMUNNARA piped W/s Scheme under DWSD, PHE Dte ORD/000106/2023-2024 1141/DWSD 20/07/2023 866 AHS R INFRA PRIVATE LIMITED 96.38 91.18 100
1168 Durgapur W/S Division Formal order for the work of Additional work for providing functional household tap connection (FHTC) in connection with JJM at Bhadrapur Mouza & Basgora Mouza ,Block-Durgapur-Faridpur ,Dist-Paschim Bardhaman under Gourbazar-Ichhapur W/s Scheme of Durgapur W/s Division, PHE Dte. ORD/000107/2021-2022 1253/DWSD 27/08/2021 60 SILPO UDYOG ENGINEERING CONSTRUCTIONS 6.70 6.66 0
1169 Durgapur W/S Division Acceptance cum formal order for the work of Sinking of 2 No Tube well 250 mm X 150 mm big dia Tube well 210 mtr depth direct rotary rig method using PVC pipe & Pre packed resin bonded gravels filter for Telipara piped W/s Scheme under DWSD, PHE Dte (SL-10) ORD/000107/2022-2023 739/DWSD 06/04/2022 10 M/S. D. PALIT & CO. 22.86 18.07 0
1170 Durgapur W/S Division Acceptance cum formal order for the work of Replacement of existing pipe line and extended the same of total command area of distribution network for physical certification of Har Ghat Jal in connection with JJM of Augmentation of Gopalpur piped W/S Scheme under DWSD ,PHE Dte. ORD/000107/2023-2024 1135/DWSD 20/07/2023 30 MD AAMIR KHAN 25.46 23.40 100
1171 Durgapur W/S Division Formal order for the work of Providing functional house hold tap connection (FHTC) in connection with JJM at Railpar Nepali Para of Prayagpur Mouza(JL-89) under command area of Augmentation of Kanksa (Zone-II /P-D) piped W/s Scheme (SL-01) ORD/000108/2022-2023 747/DWSD 10/05/2022 10 MAK CONSTRUCTION CO. 37.33 25.10 0
1172 Durgapur W/S Division Acceptance cum formal order for the work of Creating a separate zone for PATHANPARA and Bagdipara of Kanksa (Zone-II/Part-C) with construction of Pump house /Chlorine room Sinking of 150 mm X 80 mm X 150 mtr deep Tube well & supplying laying of HDPE distribution pipe line and providing FHTC at Paragraph Mouza under Augmentation of Kanksa (Zone-II/Part-C) piped W/s Scheme under DWSD, PHE Dte ORD/000108/2023-2024 1139/DWSD 20/07/2023 45 JOY GURU ENTERPRISE 95.50 0.00 0
1173 Durgapur W/S Division Formal order for the work of Laying and aligning of DI K9 Rising main pipe line supplying of DI Specials and valves and other allied works under Command area of Bistupur piped W/s Scheme under DWSD PHE Dte (SL-12) ORD/000109/2022-2023 749/DWSD 10/05/2022 20 MAK CONSTRUCTION CO. 17.52 14.97 0
1174 Durgapur W/S Division Special repair and renovation of 160 mtr boundary wall ,Pump house ,300 M3 CWR at Kanksa (Zone-II/Part-B) under Augmentation of TELIPARA piped W/s Scheme under DWSD, PHE Dte ORD/000110/2023-2024 1137/DWSD 20/07/2023 25 MAK CONSTRUCTION CO. 42.37 0.00 0
1175 Durgapur W/S Division Acceptance cum formal order for the work of Additional pipe line work with concrete cutting at Nachan mouza for provding FHTC in connection with JJM for Nachan mouza(JL-39) (Part-A) under command are aof Jamgora-Jagannathpur W/s Scheme at Durgapur-Faridpur block under DWSD,PHE Dte (SL-24) ORD/000111/2021-2022 1116/DWSD 30/07/2021 15 BABA LOKENATH ENTERPRISE 4.59 9.39 0
1176 Durgapur W/S Division Acceptance cum formal order for the work of Surging of 03 Nos river bed tube wells (No - 4,5 ,6 Ext ) to combat drought like situation at Ramnagari head work site under Augmentation of RCFA,Part-III (Zone-II) W/S Scheme (JJM) under Durgapur Water Supply Division , PHE Dte. (Sl-02) ORD/000111/2023-2024 05/SPOT/DWSD 16/06/2023 4 RANJIB GHATAK 0.99 0.99 100
1177 Durgapur W/S Division Formal order for the work of Additional work for provding FHTC in connection with JJM and Jal Swapna at Ijjatganj mouza (JL_71) under command area of kanksa (Zone-II) W/s Scheme of block-Durgapur-Fardipur under DWSD ,PHE Dte (SL-08) ORD/000114/2021-2022 1375/DWSD 17/09/2021 45 RANJIB GHATAK 33.78 34.40 0
1178 Durgapur W/S Division Special repair and renovation of 1(One) No 450 M3 capacity RCC Elevated Reservoir (OHR) at OHR site boundary wall and 2 (Two) Nos Pump house at Kanksa (Zone-II/Part-B) under Augmentation of Kanksa (Zone-II/Part-B) piped W/s Scheme under DWSD, PHE Dte ORD/000114/2023-2024 1138/DWSD 20/07/2023 30 MAK CONSTRUCTION CO. 35.76 9.09 80
1179 Durgapur W/S Division Formal order for the work of Emegency repairng and restoration of distribution system from command area of Gourbazar OHR {(Srikrishnapur, Kailashpur (Part)} under Gourbazar-Ichhapur piped W/s Scheme under DWSD, PHE Dte (SL-11) ORD/000115/2021-2022 1780/DWSD 20/12/2021 10 JOY GURU ENTERPRISE 5.60 4.97 0
1180 Durgapur W/S Division Approach road & others necessary allied works at Madhabmat 2nd Pump house to 3rd Pump House ,Kanksa for Kanksa Zone-II/A W/s Scheme under DWSD ,PHE Dte ORD/000115/2023-2024 1057/DWSD 20/07/2023 30 A.K.D. ENTERPRISE 25.40 25.36 100
1181 Durgapur W/S Division Formal order for the work of Extension of existing pipe line of Kanchanpur to combat drought like situation in Kanksa block to providng FHTC at Kanchanpur,Sashipu,Benodpur,Dubrajpur,Basudebpur,Talbahari mouzas repiring of leakage bursting 160 to 90 mm dia at different places ,restoration of drain village road supply of hume pipe at pump house No-II and others allied works of cmmand area under Kanchanpur piped W/s Scheme (SL-02) ORD/000116/2021-2022 1291/DWSD 07/09/2021 20 MRITYUNJOY MUKHERJEE AND CO 12.82 12.70 0
1182 Durgapur W/S Division Formal order for the work of Providing additional number of FHTC and laying of branch pipe line from existing pipe line in connection with JJM for Basuhda Mouza (JL_35) under command area of Basudha W/s Scheme at Kanksa block under DWSD ,PHE Dte (SL-06) ORD/000117/2021-2022 1376/DWSD 17/09/2021 60 M/S S. CHOUDHURY 38.92 40.02 0
1183 Durgapur W/S Division Continuation order for the work of supplying fitting fixing and installation of Sluice Valve for O & Mtc of Kanksa (Zone-II/II) piped W/s Scheme of command areas of Panaghar ,Prayagpur mouza under DWSD, PHE Dte ORD/000117/2022-2023 682/DWSD 27/04/2022 15 TARA CONSTRUCTION 4.94 0.00 0
1184 Durgapur W/S Division Acceptance cum formal order for the work of Surging of 03 Nos river bed tube wells (No - 7,9,10 Ext) to combat drought like situation at Pansuili head work site under Augmentation of RCFA,Part-III (Zone-I) W/S Scheme (JJM) under Durgapur Water Supply Division , PHE Dte. (Sl-03) ORD/000117/2023-2024 06/SPOT/DWSD 16/06/2023 4 KARMAKAR CONSTRUCTION 1.00 1.00 100
1185 Durgapur W/S Division Formal order for the work of Supplying and laying of 140 mm dia UPVC pipe line from Hetedoba OHR to Jhajra more for water supply of Sarpi more ,Jhanjra gram and Adibasipara of Jamgora under Jamgora-Jagannathpur piped W/s Scheme.(SL-07) ORD/000118/2021-2022 1371/DWSD 17/09/2021 20 MD AAMIR KHAN 23.48 45.08 0
1186 Durgapur W/S Division Acceptance cum formal order for the work of Surging of 03 Nos river bed tube wells (No - 12,14,15 Ext ) to combat drought like situation at Ramnagari head work site under Augmentation of RCFA,Part-III (Zone-II) W/S Scheme (JJM) under Durgapur Water Supply Division , PHE Dte. (Sl-04) ORD/000118/2023-2024 07/SPOT/DWSD 16/06/2023 4 RANJIB GHATAK 0.99 0.99 100
1187 Durgapur W/S Division Acceptance cum formal order for the work of Emergency repairing and restoration of distributing system from Nachan OHR to Jamgora ,Nachan more to jamgora samshan distribution main road crossing at Nachan with Hume pipe ,Bansia pratabpur and extension of pipe at different places of Pratabpur gram of Jamgora-Jagannathpur piped W/s Scheme under DWSD ,PHE Dte ORD/000120/2022-2023 781/DWSD 18/05/2022 15 M/S MONDAL ENTERPRISE 4.56 0.00 0
1188 Durgapur W/S Division Continuation for the work of Providing functional household tap connection (FHTC) in connection with JAL JEEBAN MISSION(JIM) at Sarpi mouza (JL-35) (Pt-A) under command area of Gourbazar-Ichhapur piped W/s Scheme Durgapur-Faridpur Block under Durgapur W/S Division, PHE Dte.(SL-29) ORD/000122/2021-2022 1225/DWSD 19/08/2021 10 KIRON ENTERPRISE 1.22 2.27 0
1189 Durgapur W/S Division Special renovation work for modifying of existing structure under JJM at Ijjatganj 2 No pump house site including go down and guard room as well as boundary wall of Augmentation of Kanksa Zone-II/C piped W/s Scheme under DWSD ,PHE Dte ORD/000122/2023-2024 1196/DWSD 27/07/2023 30 MUKHERJEE ENTERPRISE 15.31 12.32 100
1190 Durgapur W/S Division Continuation order for the work of Continuation for the work of Providing functional household tap connection (FHTC) in connection with JAL JEEBAN MISSION(JIM) at Sarpi mouza (JL-35) (Pt-A) under command area of Gourbazar-Ichhapur piped W/s Scheme Durgapur-Faridpur Block under Durgapur W/S Division, PHE Dte.(SL-29) ORD/000123/2021-2022 1214/DWSD 17/08/2021 15 KIRON ENTERPRISE 4.84 9.72 0
1191 Durgapur W/S Division Acceptance cum formal order for the work of Construction of Guard room cum rest shed at Kanksa Ijjatganj 2nd Pump house site of Augmentation of Kaksa (Zone-II) /Part-C) piped W/S Scheme under DWSD,PHE Dte (SL-09) ORD/000123/2022-2023 785/DWSD 18/05/2022 15 BASANTI TRADERS 4.99 4.05 0
1192 Durgapur W/S Division Emergent Road restoration dismanttled road of Paranganj mouza of Jemua Piped Water supply scheme under DWSD ,PHE Dte ORD/000123/2023-2024 1197/DWSD 27/07/2023 35 MAK CONSTRUCTION CO. 14.52 14.40 100
1193 Durgapur W/S Division Acceptance cum formal order for the work of Sinking of 1 No(300X200 mm dia)-Sinking of 1 No (300 mm X 200 mm dia) 210 mtr depth Direct Rotary method using PVC pipe and fibber glass reinforced epoxy resin slotted at ARRAH SIBTALA (T.No-01) under Augmentation of Roopganj piped W/S Scheme under DWSD, PHE Dte (SL-10) ORD/000124/2022-2023 811/DWSD 21/05/2022 10 JOY GURU ENTERPRISE 13.78 12.81 0
1194 Durgapur W/S Division Repairing and renovation of pump house with sanitary arrangement as well as boundary wall at H/W site (Ijjatganj OHR) of Augmentation of Kaksa (Zone-II/Pt-C) piped W/s Scheme ORD/000124/2023-2024 1198/DWSD 27/07/2023 30 MAITO MAA ENTERPRISE 14.93 0.00 0
1195 Durgapur W/S Division Acceptance cum formal order for the work of Sinking of 1 No (250 mm X 150 mm dia) 210 mtr depth Direct Rotary method using PVC pipe and fibber glass reinforced epoxy resin slotted at ARRAH BAZAR (T.No-03) under Augmentation of Roopganj piped W/S Scheme under DWSD, PHE Dte.(SL-11) ORD/000125/2022-2023 812/DWSD 21/05/2022 10 JOY GURU ENTERPRISE 11.86 11.00 0
1196 Durgapur W/S Division Acceptance cum formal order for the work of Additional work for supplying laying and aligning of UPVC distribution pipe line and allied works including FHTC and connecting providing to Saraswatiganj (JL-49) ,Bistupur(JL-44) Mouzas under command area of Bistupur distribution system (Part-B) under Bistupur W/s Scheme (SL-01) ORD/000126/2022-2023 813/DWSD 21/05/2022 25 SK. ABDUL HALIM 76.67 72.69 0
1197 Durgapur W/S Division Acceptance cum formal order for the work of Surging of 03 Nos river bed tube wells (No - 1,2,3 Ext) to combat drought like situation at Ramnagar head work site under Augmentation of RCFA,Part-III (Zone-II) W/S Scheme (JJM) under Durgapur Water Supply Division , PHE Dte. (Sl-01) ORD/000126/2023-2024 10/SPOT/DWSD 16/06/2023 4 RANJIB GHATAK 0.99 0.99 100
1198 Durgapur W/S Division Acceptance cum formal order for the work of Additional work for supplying laying and aligning of UPVC distribution pipe line and allied works including FHTC and connection providing to Akandara (JL-47) ,Molandighi (JL-48),Kandarakona (JL-51),Rakhitpur (JL-42) ,Chua(JL-43),Bhagaabanpur (JL-45),Hariki(JL-50) Mouzas under command area of Bistupur distributin system (Part-A) of Bistupur piped W/s Scheme under DWSD,PHE Dte (SL-02) ORD/000127/2022-2023 814/DWSD 21/05/2022 25 MRITYUNJOY MUKHERJEE AND CO 71.11 44.60 0
1199 Durgapur W/S Division Acceptance cum formal order for the work of Surging of 03 Nos river bed tube wells (No - 16,17,18 Ext ) to combat drought like situation at Pansiuli head work site under Augmentation of RCFA,Part-III (Zone-I) W/S Scheme (JJM) under Durgapur Water Supply Division , PHE Dte. (Sl-02) ORD/000127/2023-2024 11/SPOT/DWSD 16/06/2023 4 KARMAKAR CONSTRUCTION 1.00 1.00 100
1200 Durgapur W/S Division Acceptance cum formal order for the work of Supplying laying and aligning of UPVC distributing pipe line and allied works including FHTC and connection providing Kuldiha(JL-53),Pathardiha(JL-52) ,Keshbpur(JL-66) Mouzas under command area of Bistupur distribution system (Part-B) of Bistupur piped W/S Scheme under DWSD,PHE Dte. (SL-03) ORD/000128/2022-2023 815/DWSD 21/05/2022 25 TARA CONSTRUCTION 54.66 42.36 0
1201 Durgapur W/S Division Acceptance cum formal order for the work of Surging of 03 Nos river bed tube wells (No -11,12 Ext & 4 New ) to combat drought like situation at Pansuili head work site under Augmentation of RCFA,Part-III (Zone-I) W/S Scheme (JJM) under Durgapur Water Supply Division , PHE Dte. (Sl-03) ORD/000128/2023-2024 12/SPOT/DWSD 16/06/2023 4 KARMAKAR CONSTRUCTION 1.00 1.00 100
1202 Durgapur W/S Division Acceptance cum formal order for the work of Additional FHTC work at Kanksa block and supplying laying and aligning of HDPE distribution pipe line and allied works at Railpar Sarada Pally and Prayagpur Mouza under command area of Augmentation of Kanksa (Zone-II/Part-D) Piped W/s Scheme under DWSD ,PHE Dte. (SL-04) ORD/000129/2022-2023 816/DWSD 21/05/2022 30 SAIKAT RAY 80.17 76.74 0
1203 Durgapur W/S Division Acceptance cum formal order for the work of Surging of 03 Nos river bed tube wells (No -10,13 Ext & 14 New ) to combat drought like situation at Pansuili head work site under Augmentation of RCFA,Part-III (Zone-I) W/S Scheme (JJM) under Durgapur Water Supply Division , PHE Dte. (Sl-04) ORD/000129/2023-2024 13/SPOT/DWSD 16/06/2023 4 KARMAKAR CONSTRUCTION 1.00 1.00 100
1204 Durgapur W/S Division Acceptance cum formal order for the work of Supplying, laying and aligning of HDPE/DI distribution pipe line and allied works including FHTC and connection providing to ICDS ,Health Centre, Govt Building ,School under command area of Gopalpur Mouza of Augmentation of Gopalpur piped W/S Scheme under DWSD,PHE Dte . (SL-17) ORD/000130/2022-2023 817/DWSD 21/05/2022 184 MACHINO TECHNO 77.49 51.75 0
1205 Durgapur W/S Division Acceptance cum formal order for the work of Emergency repairing and restoration of distribution system of Nachan ,Bansia, Dhabani Labnapara for providing sufficient water to every house hold of Gourbazar -Ichhapur piped W/s Scheme under DWSD ,PHE Dte(SL-01) ORD/000131/2021-2022 1162/DWSD 02/08/2021 15 M/S MONDAL ENTERPRISE 4.75 9.51 0
1206 Durgapur W/S Division Acceptance cum formal order for the work of Construction boundary wall at Shilampur pump house No-1 under Augmentation of ground water base Kanksa (Zone-I) piped W/s Scheme under DWSD ,PHE Dte (SL-16) ORD/000131/2022-2023 818/DWSD 23/05/2022 20 BASANTI TRADERS 10.89 9.18 100
1207 Durgapur W/S Division Acceptance cum formal order for the work of Supplying , fitting , fixing and fabrication of sign board With Necessary allied Work at different Placeses of ongoing New PWSS &Augamentation Scheme (As per Departmental Approved drawing & Direction) in connection with Augmentation of Kanksa Zone - I Pipe W/S Scheme ( JJM) Work under Durgapur Water Supply Division ,PHE Dte. (Sl - 06) ORD/000131/2023-2024 15/SPOT/DWSD 16/06/2023 7 AMARANJALI CONSTRUCTION 0.96 0.00 0
1208 Durgapur W/S Division Acceptance cum formal order for the work of Emergency repairing and restoration of distribution system of Protapur ,Kalikapur and Jamgora village under command area of Nachan OHR of Jamgora-Jagannathpur piped W/s Scheme under DWSD, PHE Dte (SL-02) ORD/000132/2021-2022 1163/DWSD 02/08/2021 20 RANJIB GHATAK 4.85 0.00 100
1209 Durgapur W/S Division Acceptance cum formal order for the work of Additional work for supplying laying and aligning of HDPE distribution pipe line and allied works at Railpar Sarada Pally of Prayagpur Mouza under command area of Augmentation of Kanksa (Zone-II/D) piped W/S Scheme under DWSD,PHE Dte (Part-C) (SL-05) ORD/000132/2022-2023 819/DWSD 23/05/2022 30 MD AAMIR KHAN 76.63 76.81 0
1210 Durgapur W/S Division Acceptance cum formal order for the work of Instalation of Water Level Indicater at Loudoha head work site under RCFA,Part-III ,Zone -I W/S Scheme (JJM) under Durgapur Water Supply Division , PHE Dte. (Sl-07) ORD/000132/2023-2024 16/SPOT/DWSD 16/06/2023 7 KARMAKAR CONSTRUCTION 0.77 0.77 100
1211 Durgapur W/S Division Acceptance cum formal order for the work of Emergency repairing and restoration of distribution system from command area of Gourbazar OHR (Gourbazar-Srikrishanapur,Kailashpur(Part) for providing sufficient Water to every house holds under Gourbazar-Ichhapur piped W/s Scheme under DWSD ,PHE Dte (Part-B) (SL-03) ORD/000133/2021-2022 1164/DWSD 02/08/2021 15 JOY GURU ENTERPRISE 3.49 3.49 0
1212 Durgapur W/S Division Acceptance cum formal order for the work of Additional work for laying and aligning of DI K9 rising main pipe line and supplying DI specials ,valves & allied works under command area of Bistupur piped W/S Scheme under DWSD ,PHE Dte (Sl-06) ORD/000133/2022-2023 820/DWSD 23/05/2022 15 MAK CONSTRUCTION CO. 39.46 39.53 0
1213 Durgapur W/S Division Acceptance cum formal order for the work of Supplying installation of 4(Four) Nos Centrifugal pumping machinery of 1 Hp for providing port water for existing Stand alon at Labnapara under Kataberia piped W/s Scheme under DWSD,PHE Dte. (Sl- 01) ORD/000133/2023-2024 1179/DWSD 24/07/2023 15 GHOSH & ROY ENTERPRISE 1.00 1.00 100
1214 Durgapur W/S Division Acceptance cum formal order for the work of Supplying installation of 4(Four) Nos Centrifugal pumping machinery of 1 Hp for providing port water for existing Stand alon at Kataberia under Kataberia piped W/s Scheme under DWSD,PHE Dte. (Sl- 02) ORD/000134/2023-2024 1191/DWSD 25/07/2023 15 GHOSH & ROY ENTERPRISE 1.00 1.00 100
1215 Durgapur W/S Division Acceptance cum formal order for the work of Supplying installation of 4(Four) Nos Centrifugal pumping machinery of 1 Hp for providing port water for existing Stand alon at Jamgora under Kataberia piped W/s Scheme under DWSD,PHE Dte. (Sl- 03) ORD/000135/2023-2024 1178/DWSD 24/07/2023 15 GOUTAM GHOSH 1.00 1.00 100
1216 Durgapur W/S Division Acceptance cum formal order for the work of demarcation of new land for mahal OHR site and repairing of UPVC pipe line and allied works at Konda ,Gobindapur village under Modified RCFA Part-III W/s Scheme under DWSD,PHE Dte (SL-01) ORD/000136/2022-2023 952/DWSD 16/06/2022 10 RANJIB GHATAK 3.19 3.19 0
1217 Durgapur W/S Division Acceptance cum formal order for the work of Supply, delivery & installation of Poly vinayle laminated board including framework for different Head Work site of New PWSs (JJM) under Kanksa Zone- I W/S Scheme under EE/DWSD/ PHE Dte. (Sl- 04) ORD/000136/2023-2024 1189/DWSD 25/07/2023 15 JOY GURU ENTERPRISE 0.82 0.82 100
1218 Durgapur W/S Division Acceptance cum formal order for the work of Extension of pipe line from existing pipe line and replace old damaged AC pipe line with HDPE pipe of Kanksa Zone-I W/s Scheme to combat draught like situation in Kanksa block to providing FHTC at Shilampur Gosh Para Mouza JL-89 under DWSD ,PHE Dte (SL-10) ORD/000137/2021-2022 1320/DWSD 14/09/2021 15 MAK CONSTRUCTION CO. 4.91 9.83 0
1219 Durgapur W/S Division Acceptance cum formal order for the work of Surging of 03 Nos river bed tube wells (No - 1,3,4 Ext) to combat drought like situation at Pansuili head work site under Augmentation of RCFA,Part-III (Zone-I) W/S Scheme (JJM) under Durgapur Water Supply Division , PHE Dte. (Sl-01) ORD/000137/2023-2024 1254/DWSD 02/08/2023 10 KARMAKAR CONSTRUCTION 1.00 1.00 100
1220 Durgapur W/S Division Acceptance cum formal order for the work of Supplying ,fitting and fixing of CI special ,valve construction of Sluice valve chamber & others allied work for distribution system of entire command area of Gourbazar OHR site under Gourbazar-Ichhapur piped W/S Scheme under DWSD,PHE Dte (SL-16) ORD/000138/2021-2022 1177/DWSD 02/08/2021 15 JOY GURU ENTERPRISE 4.36 8.50 0
1221 Durgapur W/S Division Acceptance cum formal order for the work of Construction of Pump house cum Chlorine room at ARRAH bazar T.No-III Pump house & tube well no-3 for Augmentation of Roopganj piped W/s Scheme under DWSD,PHE Dte (SL-03) ORD/000138/2022-2023 954/DWSD 16/06/2022 45 KIRON ENTERPRISE 4.87 2.44 0
1222 Durgapur W/S Division Acceptance cum formal order for the work of Sanitary arrangement and plumbing work at Molandighi H/W site pump house no-II tube wno II for Bistupur piped W/S Scheme under DWSD, PHE Dte(SL-04) ORD/000140/2022-2023 961/DWSD 17/06/2022 10 BABA LOKENATH ENTERPRISE 4.80 3.91 100
1223 Durgapur W/S Division Acceptance cum formal order for the work of Supply fitting fixing and installation of sluice valve for O & Mtc of Kanksa (Zone-II (Ph-II) W/s Scheme command area of Panagarh ,Prayagpur Mouza under DWSD ,PHE Dte. (SL-13) ORD/000141/2021-2022 1322/DWSD 14/09/2021 15 TARA CONSTRUCTION 4.93 4.68 0
1224 Durgapur W/S Division Acceptance cum formal order for the work of Construction of temporary approach road at Molandighi H/W site of Bistupur piped W/s Scheme under DWSD ,PHE Dte (SL-05) ORD/000141/2022-2023 962/DWSD 17/06/2022 10 MACHINO TECHNO 4.11 4.09 0
1225 Durgapur W/S Division Acceptance cum formal order for the work of repairing of office room and necessary allied works under Augmentation of Kanksa Zone-I piped W/s Scheme under DWSD, PHE Dte ORD/000141/2023-2024 1271/DWSD 07/08/2023 15 A.K.D. ENTERPRISE 4.90 1.74 100
1226 Durgapur W/S Division Acceptance cum formal order for the work of Land development at Molandighi H/W site & back filling of Bistupur H/W site of Bistupur piped W/s Scheme under DWSD ,PHE Dte (SL-06) ORD/000142/2022-2023 963/DWSD 17/06/2022 10 MRITYUNJOY MUKHERJEE AND CO 4.15 4.17 0
1227 Durgapur W/S Division Acceptance cum formal order for the work of 1(One) No PWD road crossing SH-34 at Railpar Sarada Pally near DVC Canal under command area of Kanksa Zone-II/Pt-A distribution main by modern trenches less technology through JACK Pushing method under Augmentation of RCFA part III Zone I piped W/s Scheme under DWSD ,PHE Dte ORD/000142/2023-2024 1272/DWSD 07/08/2023 620 SAIKAT RAY 8.56 0.00 100
1228 Durgapur W/S Division Acceptance cum formal order for the work of Construction of temporary approach road at Gopalpur H/W site of Gopalpur piped W/s Scheme under DWSD ,PHE Dte(SL-07) ORD/000143/2022-2023 975/DWSD 22/06/2022 15 AMAR CONSTRUCTION 4.11 3.97 0
1229 Durgapur W/S Division Acceptance cum formal order for the work of 1(One) No PWD road crossing SH-34 at kanksa underpass under command area of Kanksa Zone-II/Pt-C distribution main by modern trenches less technology through JACK Pushing method under Augmentation of Kanksa Zone-II/Part-C piped W/s Scheme under DWSD ,PHE Dte ORD/000143/2023-2024 1274/DWSD 07/08/2023 633 MRITYUNJOY MUKHERJEE AND CO 12.05 0.00 100
1230 Durgapur W/S Division Acceptance cum formal order for the work of 1(One) No PWD road crossing at JAMDOBA under command area of Telipara distribution main by modern trenches less technology through JACK Pushing method under Augmentation of Telipara piped W/s Scheme under DWSD ,PHE Dte (Part-C) ORD/000144/2023-2024 1273/DWSD 07/08/2023 15 SK. ALIM 8.74 8.74 100
1231 Durgapur W/S Division Acceptance cum formal order for the work of Water supply arrangement at different places to combat water crisis at Bonsal,Hetedoba,Jabber Pally & Hetedoba, block - Durgapur-Faridpur of Ichhapur GP under DWSD, PHE Dte . (SL-28) ORD/000145/2021-2022 1183/DWSD 06/08/2021 15 JOY GURU ENTERPRISE 3.21 0.00 0
1232 Durgapur W/S Division Acceptance cum formal order for the work of Additional concreting of exiting dismantled road after extension of pipe line and retrofitting of existing pipe distribution system of kanksa block under Augmentation of Gopalpur piped W/s Scheme (Part-A, B) ORD/000145/2023-2024 1275/DWSD 07/08/2023 15 JOY GURU ENTERPRISE 8.95 8.94 100
1233 Durgapur W/S Division Acceptance cum formal order for the work of Emergent supply fitting ,fixing of sluice valve for repairing and maintenance of pipe line under command area of Jamgora-Jagannathpur W/s Scheme under DWSD, PHE Dte(SL-30). ORD/000146/2021-2022 1184/DWSD 06/08/2021 20 TARA CONSTRUCTION 3.86 3.83 0
1234 Durgapur W/S Division Acceptance cum formal order for the work of Additional concreting of exiting dismantled road after extension of pipe line and retrofitting of existing pipe distribution system of kanksa block under Augmentation of Roopganj piped W/s Scheme (Part-A, B) ORD/000146/2023-2024 1276/DWSD 07/08/2023 15 JOY GURU ENTERPRISE 8.95 8.95 100
1235 Durgapur W/S Division Acceptance cum formal order for the work of Land development at Gopalpur H/W site and back filling along the boundary wall of Augmentation of Gopalpur piped W/s Scheme under DWSD ,PHE Dte (SL-12) ORD/000147/2022-2023 979/DWSD 22/06/2022 15 AMAR CONSTRUCTION 4.63 4.39 0
1236 Durgapur W/S Division Acceptance cum formal order for the work of construction of 5.40 mtr X 3.60 mtr switch room with plinth height (600 to 2000 mm) with sanitary and water supply arrangemnt at Kanksa of Kanksa Block under Augmentation of Kanksa (Zone-II) (Part-C) piped W/S Scheme under DWSD,PHE Dte ORD/000147/2023-2024 1277/DWSD 07/08/2023 45 PRADIP CHOUDHARY 5.83 0.00 100
1237 Durgapur W/S Division Acceptance cum formal order for the work of Extension of existing Gopalpur sub district laboratory at Kanksa of Augmentation of Gopalpur piped W/s Scheme under DWD ,PHE Dte (SL-13) ORD/000148/2022-2023 980/DWSD 22/06/2022 15 BASANTI TRADERS 4.94 3.90 100
1238 Durgapur W/S Division Acceptance cum formal order for the work of construction of pump house cum chlorine room at Silampur pump house No-I H/W site for Augmentation of Kanksa (Zone-I) piped W/s Scheme under DWSD,PHE Dte ORD/000148/2023-2024 1279/DWSD 07/08/2023 45 MUKHERJEE ENTERPRISE 6.41 0.00 100
1239 Durgapur W/S Division Acceptance cum formal order for the work of Additional trail bore by direct Rotary method drilling using Rig machin at Kanchanpur/Basdebpur H/W Site for newly sinking of Well No-I and II under Augmentation of Kanksa (Zone-I) piped W/s scheme under DWSD, PHE Dte ORD/000149/2023-2024 1280/DWSD 07/08/2023 10 JOY GURU ENTERPRISE 2.27 2.27 100
1240 Durgapur W/S Division Acceptance cum formal order for the work of 1(One) No PWD road crossing at Bistupur under command area of Bistupur distribution main by modern trenches less technology through JACK Pushing method Note- 46 and node point 64,65 under Augmentation of Bistupur piped W/s Scheme under DWSD ,PHE Dte (Part-C) ORD/000151/2023-2024 1282/DWSD 07/08/2023 15 MRITYUNJOY MUKHERJEE AND CO 10.92 10.92 100
1241 Durgapur W/S Division Acceptance cum formal order for the work of Repairing of existing concrete road restoration and other allied works under Augmentation of Bamunnara piped W/s Scheme under DWSD,PHE Dte (Part-E) ORD/000152/2023-2024 1283/DWSD 07/08/2023 15 AHS R INFRA PRIVATE LIMITED 9.13 9.13 100
1242 Durgapur W/S Division Acceptance cum formal order for the work of Additional concreting of exiting dismantled road after extension of pipe line and retrofitting of existing pipe distribution system of kanksa block under Augmentation of Bistupur piped W/s Scheme (Part-A & B) ORD/000153/2023-2024 1284/DWSD 07/08/2023 15 AHS R INFRA PRIVATE LIMITED 9.08 9.04 100
1243 Durgapur W/S Division Acceptance cum formal order for the work of Drawing ,design and surveying work for proposed piped W/s Scheme of Sarpi W/S Scheme under DWSD, PHE Dte(SL-02) ORD/000154/2022-2023 1022/DWSD 04/07/2022 10 APEX ENGINEERING 4.09 4.09 100
1244 Durgapur W/S Division 1(One) No PWD road crossing at Bistupur under command area of Bistupur distribution main by modern trenches less technology through JACK Pushing method under Augmentation of Augmentation of Bistupur piped W/s Scheme under DWSD ,PHE Dte (Part-B) ORD/000154/2023-2024 1285/DWSD 07/08/2023 15 MACHINO TECHNO 10.92 10.92 100
1245 Durgapur W/S Division Acceptance cum formal order for the work of Additional FHT work of Arrah mouza and Roopganj mouza part under command area of Augmentation of Roopganj Piped W/S Scheme under DWSD ,PHE Dte(SL-03) ORD/000155/2022-2023 1023/DWSD 04/07/2022 10 QUICK PAL SUPPLIERS 4.98 4.98 0
1246 Durgapur W/S Division 1(One) No PWD road crossing SH-34 at Mini bazar more under command area of Kanksa Zone-II/Pt-C distribution main by modern trenches less technology through JACK Pushing method under Augmentation of Kanksa Zone-II/Part-C piped W/s Scheme under DWSD ,PHE Dte ORD/000155/2023-2024 1286/DWSD 07/08/2023 633 MACHINO TECHNO 10.92 0.00 100
1247 Durgapur W/S Division Acceptance cum formal order Additional work for providing FHTC tap connection with JJM at Kanksa mouza-89 and its adjoing are a under command area of Augmentation of Kanksa Zone-II/C W/s Scheme at Kanksa block under DWSD ,PHE Dte (SL-04) ORD/000156/2022-2023 1024/DWSD 04/07/2022 10 QUICK PAL SUPPLIERS 4.98 4.98 0
1248 Durgapur W/S Division Construction of 5.40 mtr X 3.60 mtr switch room with plinth height (600 to 2000 mm) with sanitary and water supply arrangement at Kanksa of Kanksa Block under Augmentation of Kanksa (Zone-II) (Part-C) piped W/S Scheme under DWSD,PHE Dte ORD/000156/2023-2024 1287/DWSD 07/08/2023 45 MOTIONMASS TECHNO (OPC) PVT LTD 6.75 6.58 100
1249 Durgapur W/S Division Acceptance cum formal order for the work of Extension of pipe line from existing pipe line of Jamgora-Jagannathpur W/s Scheme to combat draught like situation in Durgapur-Faridpur block to provide FHTC at Banerjeepara,Mukherjee para ,Bouri Para ,Harimandir ,Durgamandir of Nachan Gram from Nachan bypass of Nachan Mouza (JL-39) (Part-B) under DWSD, PHE Dte(SL-18) ORD/000157/2021-2022 1326/DWSD 14/09/2021 15 BABA LOKENATH ENTERPRISE 4.50 8.89 0
1250 Durgapur W/S Division Acceptance cum formal order for the work of additional work for providing FHTC tap connecting with JJM at Prayagpur mouza -88 and its adjoining area under command area of Augmentation of Kanksa (Zoe-II/B_) piped W/S Scheme block Kanksa under DWSD,PHE Dte (SL-05) ORD/000157/2022-2023 1025/DWSD 04/07/2022 10 QUICK PAL SUPPLIERS 4.98 5.03 0
1251 Durgapur W/S Division Repairing of existing concrete road restoration and other allied works under Augmentation of Roopganj piped W/s Scheme under DWSD,PHE Dte (Part-D) ORD/000157/2023-2024 1288/DWSD 07/08/2023 20 CHANDAN HAZRA 8.69 8.66 100
1252 Durgapur W/S Division Acceptance cum formal order for the work of Repairing and renovation of pump house with sanitary arrangement at Roopganj near tube well under Augmentation of Roopganj piped W/s Scheme under DWSD, PHE Dte (SL-08) ORD/000158/2022-2023 1028/DWSD 04/07/2022 7 R.C.ENTERPRISE 4.01 0.00 0
1253 Durgapur W/S Division Repairing of existing concrete road restoration and other allied works at Dalubandh mouza under Augmentation of RCFA Part-III (Zone-II) piped W/s Scheme under DWSD,PHE Dte (Part-D) ORD/000158/2023-2024 1289/DWSD 07/08/2023 25 PRAKRITI CONSTRUCTION 7.82 7.81 80
1254 Durgapur W/S Division Acceptance cum formal order for the work of Construction of pump house cum Chlorine room at Roopganj H/W site near TW-1/2/3 pf Augmentation of Roopganj piped W/S Scheme under DWSD ,PHE Dte (SL-09) ORD/000159/2022-2023 1029/DWSD 04/07/2022 15 R.C.ENTERPRISE 4.45 3.23 0
1255 Durgapur W/S Division Construction of 5.40 mtr X 3.60 mtr switch room with plinth height (600 to 2000 mm) with sanitary and water supply arrangement at Kanksa zone-II/Part-B) under Augmentation of Kanksa (Zone-II) (Part-B) piped W/S Scheme under DWSD,PHE Dte ORD/000159/2023-2024 1291/DWSD 07/08/2023 45 PRAKRITI CONSTRUCTION 5.74 0.00 10
1256 Durgapur W/S Division Construction of 5.40 mtr X 3.60 mtr switch room with plinth height (600 to 2000 mm) with sanitary and water supply arrangement at Kanksa zone-II/Part-B) under Augmentation of Kanksa (Zone-II) (Part-B) piped W/S Scheme under DWSD,PHE Dte ORD/000160/2023-2024 1292/DWSD 07/08/2023 45 PRAKRITI CONSTRUCTION 6.02 0.00 100
1257 Durgapur W/S Division Construction of 5.40 mtr X 3.60 mtr switch room with plinth height (600 to 2000 mm) with sanitary and water supply arrangement at Kanchanpur of Kanksa Block under Augmentation of Kanksa (Zone-II) (Part-C) piped W/S Scheme under DWSD,PHE Dte ORD/000161/2023-2024 1293/DWSD 07/08/2023 45 MAJI DEVELOPERS 6.09 0.00 100
1258 Durgapur W/S Division Acceptance cum formal order for the work of Additional work for providing FHTC tap connection with JJN at Debipur mouza -87 and its adjoining area under command area of Augmentation of Kanksa (Zone-II/A ) piped W/s Scheme at Kanksa block under DWSD, PHE Dte (SL-12) ORD/000162/2022-2023 1032/DWSD 04/07/2022 10 QUICK PAL SUPPLIERS 4.99 4.99 0
1259 Durgapur W/S Division Water supply arrangement for guard shed with solar power connection to provide water supply block -Kanksa under Augmentation of Bistupur Piped W/s scheme under DWSD,PHE Dte ORD/000162/2023-2024 1290/DWSD 07/08/2023 20 SUNDAR CONSTRUCTION 5.95 5.95 100
1260 Durgapur W/S Division Acceptance cum formal order for the work of Bypass connection from existing R/M at Gopalpur OHR site and jungle cutting at head work site Pump house Site -II and III of Gopalpur W/s Scheme under DWSD,PHE Dte .(SL-29) ORD/000163/2021-2022 1333/DWSD 14/09/2021 15 QUICK PAL SUPPLIERS 4.94 0.00 0
1261 Durgapur W/S Division 1(One) No PWD road crossing at Bistupur under command area of Bistupur distribution main by modern trenches less technology through JACK Pushing method under Augmentation of Augmentation of Bistupur piped W/s Scheme under DWSD ,PHE Dte (Part-A) ORD/000163/2023-2024 1294/DWSD 07/08/2023 15 MRITYUNJOY MUKHERJEE AND CO 10.91 10.91 100
1262 Durgapur W/S Division Laying & aligning of DI K9 rising main pipe line and interconnection of TW No-3 with OHR and other allied works of Augmentation of Kanksa Zone-II/Part-B piped W/s Scheme under DWSD ,PHE Dte (Pat-A) ORD/000164/2023-2024 1295/DWSD 07/08/2023 657 SILPO UDYOG ENGINEERING CONSTRUCTIONS 16.23 0.00 70
1263 Durgapur W/S Division Acceptance cum formal order for the work of Cleaning the chokage of AC Pipe line of 80 /100/150 mm dia for providing water supply to Arrah Mouza & other allied works for providing FHTC of Roopgnaj W/s Scheme under DWSD ,PHE Dte (SL-34) ORD/000165/2021-2022 1336/DWSD 14/09/2021 10 M/S KALYANI ENTERPRISE 4.14 0.00 0
1264 Durgapur W/S Division Formal order for the work of Construction of pump house/Chlorine room,sinking tube well of 150 X 80 X 120 mtr depth and supplying laying of HDPE distribution pipe line and providing FHTC at Kotalpukur,Masna,Nimtikuri mouzas of Kotalpukur piped W/s Scheme under DWSD, PHE Dte under DWSD, PHE Dte (Part-A ,B & C) (SL-02) ORD/000165/2022-2023 773/DWSD 17/05/2022 45 JOY GURU ENTERPRISE 41.01 35.36 0
1265 Durgapur W/S Division Additional concreting of exiting dismantled road after extension of pipe line and retrofitting of existing pipe distribution system of kanksa block at Basudevpur village, Kanchanpur (N),Talbahari under Augmentation of Kanchanpur piped W/s Scheme (Part- A) ORD/000165/2023-2024 1296/DWSD 07/08/2023 15 M/S MANDAL ENTERPRISE 5.87 5.87 100
1266 Durgapur W/S Division Formal order for the work of Construction of pump house/Chlorine room,sinking tube well of 150 X 80 X 120 mtr depth and supplying laying of HDPE distribution pipe line and providing FHTC at DHOBARU mouza of Dhobaru piped W/s Scheme under DWSD, PHE Dte (Part-A ,B and C) (SL-01) ORD/000166/2022-2023 774/DWSD 17/05/2022 45 SILPO UDYOG ENGINEERING CONSTRUCTIONS 44.99 43.10 100
1267 Durgapur W/S Division Additional concreting of exiting dismantled road after extension of pipe line and retrofitting of existing pipe distribution system of kanksa block at Kanchanpur under Augmentation of Kanchanpur piped W/s Scheme (Part- B) ORD/000166/2023-2024 1298/DWSD 07/08/2023 15 M/S BANERJEE CONSTRUCTION 7.05 7.05 100
1268 Durgapur W/S Division Acceptance cum formal order for the work of Emegent supply ,fitting -fixing of Sluice valve for repairing and maintenance of pipe line under command area from Sarpi village,Amlouka,Patseura,Arati,Jabuna areas of Gourbazar-Ichhapur piped W/s Scheme under DWSD ,PHE Dte (SL-01) ORD/000167/2021-2022 1338/DWSD 14/09/2021 15 MD AAMIR KHAN 4.56 4.49 0
1269 Durgapur W/S Division Formal order for the work of Construction of pump house/Chlorine room,sinking tube well of 150 X 80 X 120 mtr depth and supplying laying of HDPE distribution pipe line and providing FHTC at Garkilla-Kherobari,Gourangapur(28) mouzas of Garkilla-Kherobari piped W/s Scheme under DWSD, PHE Dte under DWSD, PHE Dte (Part-A ,B & C) (SL-5) ORD/000167/2022-2023 764/DWSD 13/05/2022 45 BABA LOKENATH ENTERPRISE 28.84 28.42 100
1270 Durgapur W/S Division Repairing of existing concrete road restoration and other allied works at Konda ,Gobindapur mouza under Augmentation of RCFA Part-III (Zone-I) piped W/s Scheme under DWSD,PHE Dte (Part-A) ORD/000167/2023-2024 1299/DWSD 07/08/2023 15 SAIKAT RAY 9.62 9.62 100
1271 Durgapur W/S Division Acceptance cum formal order for the Work of Emergent supplying, fitting fixing of Sluice valve for repairing and maintenance of ppe line under command are a of Ichhapur areas of Gourbazar-Ichhapur piped W/s Scheme under DWSD ,PHE Dte (SL-02) ORD/000168/2021-2022 1339/DWSD 14/09/2021 20 MD AAMIR KHAN 4.42 4.38 0
1272 Durgapur W/S Division Acceptance cum formal order for the work of Additional work for providing FHTC tap connection with JJM at Panagarh mouza-88 and its adjoing area under command area of Augmentation of Kanksa (Zone-II/Part-D) piped W/s Scheme under DWSD, PHE Dte (SL-06) ORD/000168/2022-2023 1026/DWSD 04/07/2022 10 QUICK PAL SUPPLIERS 4.89 4.89 0
1273 Durgapur W/S Division Repairing of existing concrete road restoration and other allied works at Baidhayanathpur mouza under Augmentation of RCFA Part-III (Zone-II) piped W/s Scheme under DWSD,PHE Dte (Part-B) ORD/000168/2023-2024 1300/DWSD 07/08/2023 25 BASANTI TRADERS 8.92 6.90 70
1274 Durgapur W/S Division Acceptance cum formal order for the work of Drawing design and surveying work for proposed piped W/S Scheme of Tetikhola Piped W/s Scheme under DWSD ,PHE Dte (SL-14) ORD/000169/2022-2023 1035/DWSD 04/07/2022 15 APEX ENGINEERING 3.90 3.90 0
1275 Durgapur W/S Division Balance work of providing water supply to Molandighi Junior Grills H.S. Molandighi Adivasi para SSK Arraha library and Bistupur brahmin para ICDS for providing Water supply to school under Durgapur-Faridpur/Kanksa Block under DWSD, PHE Dte ORD/000169/2023-2024 1297/DWSD 07/08/2023 15 MUKHERJEE ENTERPRISE 3.94 3.94 100
1276 Durgapur W/S Division Formal order for the work of 1 No road crossing of distribution pipe line under Bistupur distribution main (Part-B) by modern trenchless technology through Jack Pushing method at node point 540 of Bistupur piped W/S Scheme under DWSD,PHE Dte.(SL-01) ORD/000170/2022-2023 1163/DWSD 01/08/2022 25 TARA CONSTRUCTION 6.21 6.21 0
1277 Durgapur W/S Division Sinking of 2 Nos tube well 300 mm X 200 mm tube well of 210 mtrs depth by Direct rotary rig method using UPVC Piped CD and UPVC Deep well screen RDS filter at Napara site under Block-Kanksa under Augmentation of Napara piped W/s Scheme under DWD ,PHE Dte ORD/000170/2023-2024 1301/DWSD 07/08/2023 30 SK. ALIM 31.47 19.19 100
1278 Durgapur W/S Division Additional concreting of exiting dismantled road after extension of pipe line and retrofitting of existing pipe distribution system of kanksa block under Augmentation of Gopalpur piped W/s Scheme. ORD/000171/2023-2024 1302/DWSD 07/08/2023 15 V.C.CONSTRUCTION 4.75 4.71 100
1279 Durgapur W/S Division Formal order for the work of Laying of additional distribution pipe line with necessary allied works at Patsaora mouza under Gourbazar-Ichhapur piped W/S Scheme for FHT C work under DWSD, PHE Dte.(SL-03) ORD/000172/2022-2023 1146/DWSD 28/07/2022 20 SHWET BARANI 5.69 0.00 0
1280 Durgapur W/S Division Acceptance cum formal order for the work of Sinking of 1 No tube well 250 mm X 150 mm tube well of 210 mtrs depth by Direct rotary rig method using PVC pipe and prepacked resin bonded gravel filter at Tilackchandrapur barobandh Adibasipara,Block-Kanksa under Augmentation of Bistupur piped W/s Scheme under DWD ,PHE Dte ORD/000172/2023-2024 1303/DWSD 07/08/2023 30 MONDAL PRECISION PVT LTD 10.80 10.71 100
1281 Durgapur W/S Division Formal order for the work of Supplying laying and aligning of HDPE distribution pipe line and allied works under command area o Roopganj mouza of Augmentation of Roopganj piped W/s Scheme under DWSD, PHE Dte (SL-07) ORD/000173/2022-2023 1165/DWSD 01/08/2022 30 M/S BADAL GHOSH 60.68 59.50 0
1282 Durgapur W/S Division Continuation order for Additional concreting of exiting dismantled road after extension of pipe line and retrofitting of existing pipe distribution system of kanksa block at Basudevpur village, Kanchanpur (N),Talbahari under Retrofitting of ARRAH piped W/s Scheme (Part- A) ORD/000173/2023-2024 1376/DWSD 14/08/2023 7 M/S MANDAL ENTERPRISE 1.72 1.72 100
1283 Durgapur W/S Division Continuation order for Acceptance cum formal order for the work of Hiring of LUXURY Diesel Ambassador Car including higher model 2012 onwards of Diesel Ambassador or equivalent for official use (Inspection Vehicle) of Assistant Engineer for the office of the Executive Engineer ,Durgapur Water Supply Division, Public Health Engineering (w.e.f 01.09.2023 to 29.02.2024). (Sl-01) ORD/000174/2023-2024 1397/DWSD 17/08/2023 184 BIPLAB BANERJEE 0.82 2.38 30
1284 Durgapur W/S Division Formal order for the work of Restoration of exiting house hold tap connection (Damaged) and re connection of the same in connection of JJM and changes of defective pipe line of 90/110/125/140/200 mm dia UPVC pipe line at different places of distribution main command area of Basudha Piped W/s Scheme under DWSD,PHE Dte (SL-08) ORD/000175/2022-2023 1160/DWSD 01/08/2022 10 MD AAMIR KHAN 5.04 4.99 0
1285 Durgapur W/S Division Continuation order for the work of ''Laying of 600 mm dia RCC (NP3) Hume pipe by modern Hydraulic Jack pushing method including laying 150 mm dia MS pipe line at DVC More over Suri road (NH-60) for ROB under Augmentation of RCFA Part-III W/s Scheme (Zone-II) under DWSD, PHE Dte (SL_12)'' ORD/000175/2023-2024 748/DWSD 18/05/2023 15 RANJIB GHATAK 1.51 1.50 100
1286 Durgapur W/S Division Formal order for the work of 2 Nos road crossing of distribution pipe line under Bistupur distribution main (Part-C) by modern trenchless technology through Jack pushing method at node point of Bistupur piped W/s Scheme under DWSD, PHE Dte (SL-09) ORD/000176/2022-2023 1123/DWSD 22/07/2022 25 SK. ALIM 12.44 12.44 0
1287 Durgapur W/S Division Acceptance cum formal order for the work of Preparation and Submission of DPR for Augmentation of Jemua PWSS under Durgapur-Faridpur Development Block under Durgapur Water Supply Division, P.H.E Dte. (Sl No-01) ORD/000176/2023-2024 914/DWSD 22/06/2023 7 MEASURE LAND 0.78 0.78 100
1288 Durgapur W/S Division Continuation order for the work of Additional work for providing FHTC in connection with JJM at Jamgora (JL-23) block-Durgapur-Faridpur,Pachim Bardhaman under Jamgora-Jagannathpur piped W/s Scheme under DWD, PHE Dte (part-B) ORD/000177/2021-2022 1283/DWSD 06/09/2021 15 RANJIB GHATAK 4.12 3.86 0
1289 Durgapur W/S Division Formal order for the work of 3 Nos road crossing of distribution pipe line under Bistupur distribution main (Part-A) by modern trenchless technology through Jack pushing method at node point1 to 2 & 64 of Bistupur piped W/s Scheme under DWSD, PHE Dte (SL-10) ORD/000177/2022-2023 1110/DWSD 19/07/2022 25 MACHINO TECHNO 18.64 18.64 0
1290 Durgapur W/S Division Continuation order for the work of Additional work for providing FHTC in connection with JJM at Jamgora (JL-23) block-Durgapur-Faridpur,Pachim Bardhaman under Jamgora-Jagannathpur piped W/s Scheme under DWD, PHE Dte (Part-A) ORD/000178/2021-2022 1273/DWSD 02/09/2021 15 RANJIB GHATAK 4.21 8.40 0
1291 Durgapur W/S Division Formal order for the work of 2 Nos road crossing of distribution pipe line under Bistupur distribution main (Part-B) by modern trenchless technology through Jack pushing method at node point-414 to 402 of Bistupur piped W/s Scheme under DWSD, PHE Dte (SL-11) ORD/000178/2022-2023 1164/DWSD 01/08/2022 25 TARA CONSTRUCTION 12.43 12.43 0
1292 Durgapur W/S Division Acceptance cum formal order for the work of Preparation and Submission of DPR for Augmentation of KANCHANPUR PWSS under KANKSA Development Block under Durgapur Water Supply Division, P.H.E Dte. (Sl No - 03) ORD/000178/2023-2024 916/DWSD 22/06/2023 7 CARTO 0.78 0.00 0
1293 Durgapur W/S Division Continuation order for the work of Additional work for providing FHTC in connection with JJM at Jamgora (JL-23) block-Durgapur-Faridpur,Pachim Bardhaman under Jamgora-Jagannathpur piped W/s Scheme under DWD, PHE Dte (Part-C) ORD/000179/2021-2022 1290/DWSD 07/09/2021 15 RANJIB GHATAK 3.75 3.75 0
1294 Durgapur W/S Division Formal order for the work of Making of concrete RCC pier and supplying laying of MS water carrier pipe and 600 mm dia NP 3 Hume pipe with crossing of road and culvert of distribution system Kanksa (Zone--II/D) at Railpar Sarada Pally of Prayagpur mouza under command area of Augmentation of Kanksa (Zone-II/D W/s Scheme under DWSD ,PHE Dte (Part-C) ORD/000179/2022-2023 1159/DWSD 01/08/2022 30 MD AAMIR KHAN 44.11 44.28 0
1295 Durgapur W/S Division Acceptance cum formal order for the work of Preparation and Submission of DPR for Augmentation of TILAKCHANDRAPUR PWSS under KANKSA Development Block under Durgapur Water Supply Division, P.H.E Dte. (Sl No-04) ORD/000179/2023-2024 917/DWSD 22/06/2023 7 MEASURE LAND 0.78 0.00 0
1296 Durgapur W/S Division Acceptance order for the work of Details route survey ,drawing design of distribution network & preparation of estimates and DPR in connection with the JJM (FHTC) of Augmentation of Kanksa (Zone-I) piped W/S Scheme DWSD,PHE Dte (Sl-04) ORD/000180/2021-2022 1420/DWSD 27/09/2021 30 SRIJAN ECOLOGICAL UPLIFTMENT PVT. LTD. 5.52 5.52 0
1297 Durgapur W/S Division Formal order for the work of Supplying and laying of different dia UPVC pipe line with necessary allied works at Rangamatia (JL-10),Benebandhi(JL-11) Maheshpur(JL-12) Mouza of Augmentation of RCFA Part-III Piped W/s Scheme (Zone-I) (Part-B) W/s Scheme under DWSD,PHE Dte (SL-07) ORD/000180/2022-2023 874/DWSD 26/05/2022 25 BASANTI TRADERS 22.24 18.46 0
1298 Durgapur W/S Division Acceptance cum formal order for the work of Preparation and Submission of DPR for Augmentation of KRISHNAPUR PWSS under KANKSA Development Block under Durgapur Water Supply Division, P.H.E Dte. (Sl No - 05) ORD/000180/2023-2024 918/DWSD 22/06/2023 7 CARTO 0.78 0.00 0
1299 Durgapur W/S Division Formal order for the work of Details route survey, drawing design of distribution network & preparation of estimates and DPR in connection with the JJM (FHTC) of Augmentation of Kanksa (Zone-II) piped W/S Scheme DWSD,PHE Dte.(SL-05) ORD/000181/2021-2022 1601/DWSD 12/11/2021 30 SRIJAN ECOLOGICAL UPLIFTMENT PVT. LTD. 19.55 19.55 0
1300 Durgapur W/S Division Formal order for the work of Construction of 150 M3 capacity 20 mtr staging height RCC over Head Reservoir (OHR) at Nutandanga under Augmentation of RCFA Part-III W/s Scheme (Zone-I/Part-B) under DWSD, PHE Dte (SL-13) ORD/000181/2022-2023 875/DWSD 26/05/2022 184 M/S PROCHESTA ENTERPRISE 64.33 56.33 0
1301 Durgapur W/S Division Acceptance cum formal order for the work of Preparation and Submission of DPR for Augmentation of SARPI PWSS under DURGAPUR-FARIDPUR Development Block under Durgapur Water Supply Division, P.H.E Dte. (Sl No -06) ORD/000181/2023-2024 924/DWSD 23/06/2023 7 CARTO 0.78 0.00 0
1302 Durgapur W/S Division Acceptance cum formal order for the work of Connection provide to different Govt offices ,Schools,(Kanksa Thana,Kanksa Girls high Schools,Kanksa GP,TC Pur GP & 6 Nos ICDS at Kanksa mouza under DWSD,PHE Dte (SL-01) ORD/000182/2021-2022 1403/DWSD 23/09/2021 15 SWATI CORPORATION 3.03 0.00 0
1303 Durgapur W/S Division Acceptance cum formal order for the work of Preparation and Submission of DPR for Augmentation of BAMUNARA (PART - B) under DURGAPUR-FARIDPUR Block under Durgapur Water Supply Division, P.H.E Dte. (Sl No-01) ORD/000182/2023-2024 1193/DWSD 25/07/2023 7 MEASURE LAND 0.78 0.78 100
1304 Durgapur W/S Division Acceptance cum formal order for the work of Preparation and Submission of DPR for Augmentation of DHOBARU (PART - B) under DURGAPUR-FARIDPUR Block under Durgapur Water Supply Division, P.H.E Dte. (Sl No - 02) ORD/000183/2023-2024 1194/DWSD 25/07/2023 7 CARTO 0.78 0.78 100
1305 Durgapur W/S Division Acceptance cum formal order for the work of Preparation and Submission of DPR for Augmentation of RCFA Part - III Zone - I (PART - B) under Durgapur Faridpur Block under Durgapur Water Supply Division, P.H.E Dte. (Sl No - 03) ORD/000184/2023-2024 1201/DWSD 27/07/2023 7 MEASURE LAND 0.78 0.78 100
1306 Durgapur W/S Division Acceptance cum formal order for the work of Preparation and Submission of DPR for Augmentation of RCFA Part - III Zone - II (PART - B) under Durgapur Faridpur Block under Durgapur Water Supply Division, P.H.E Dte. (Sl No-04) ORD/000185/2023-2024 1235/DWSD 31/07/2023 7 MEASURE LAND 0.78 0.78 100
1307 Durgapur W/S Division Acceptance cum formal order for the work of Dismantling and reconcreting of PCC road at Madhammath Subashpally sher para of Kanksa mouza Zone-II Ph-II W/s Scheme under DWSD ,PHE Dte (SL-05) ORD/000186/2021-2022 1407/DWSD 29/09/2021 15 SWATI CORPORATION 4.56 4.56 0
1308 Durgapur W/S Division Acceptance cum formal order for the work of Preparation and Submission of DPR for Augmentation of Kanksa Zone - I (PART - B) under Kanksa Block under Durgapur Water Supply Division, P.H.E Dte. (Sl No - 05) ORD/000186/2023-2024 1239/DWSD 31/07/2023 7 CARTO 0.78 0.78 100
1309 Durgapur W/S Division Acceptance cum formal order for the work of Replace damaged 250 mtr 150 mm dai AC pipe with the UPVC 160 mm dia pipe line at Panagarh Baruipara ,Ijjatganj OHR cleaning leakage bursting at Ijjatganj and others allied works of Kanksa Zone-II ph-II W/s Scheme under DWSD,PHE Dte (SL_06) ORD/000187/2021-2022 1408/DWSD 29/09/2021 15 RANJIB GHATAK 4.20 4.20 0
1310 Durgapur W/S Division Acceptance cum formal order for the work of Preparation and Submission of DPR for Augmentation of SHYAMBAZAR (PART - B) under DURGAPUR-FARIDPUR Block under Durgapur Water Supply Division, P.H.E Dte. (Sl No -06) ORD/000187/2023-2024 1238/DWSD 31/07/2023 7 MEASURE LAND 0.78 0.78 100
1311 Durgapur W/S Division Acceptance cum formal order for the work of Preparation and Submission of DPR for Augmentation of KRISHNAPUR (PART - B) under DURGAPUR-FARIDPUR Block under Durgapur Water Supply Division, P.H.E Dte. (Sl No -07) ORD/000188/2023-2024 1237/DWSD 31/07/2023 7 MEASURE LAND 0.78 0.00 0
1312 Durgapur W/S Division Acceptance cum formal order for the work of Preparation and Submission of DPR for Augmentation of KANCHANPUR (PART - B) under DURGAPUR-FARIDPUR Block under Durgapur Water Supply Division, P.H.E Dte. (Sl No -08) ORD/000189/2023-2024 1236/DWSD 31/07/2023 7 MEASURE LAND 0.78 0.00 0
1313 Durgapur W/S Division Acceptance cum formal order for the work of Preparation and Submission of DPR for Augmentation of JATGARIA (PART - B) under DURGAPUR-FARIDPUR Block under Durgapur Water Supply Division, P.H.E Dte. (Sl No -09) ORD/000190/2023-2024 1192/DWSD 25/07/2023 7 MEASURE LAND 0.78 0.78 100
1314 Durgapur W/S Division Continuation order for Acceptance cum formal order for the work of Hiring of LUXURY Diesel Ambassador Car including higher model 2012 onwards of Diesel Ambassador or equivalent for official use for the Executive Engineer, DWSD,PHE Dte ADDA Administrative building 2nd Floor, EPIP Complex, Banskopa,DGP-12 (w.e.f 18.08.2023 to 17.02.2024). (SL-02) ORD/000191/2023-2024 1364/DWSD 11/08/2023 184 PRAMIT CHATTERJEE 0.82 2.38 100
1315 Durgapur W/S Division Balance work for construction of Pump house /Chlorine room sinking of 150 X80X120 mtr depth TW ,supplying laying of HDPE distribution pipe line and providing FHTC at Banagram mouza of Augmentation of Banagram piped W/s Scheme under DWSD,PHE Dte.(SM/16903) ORD/000192/2023-2024 1606/DWSD 21/08/2023 90 BISHAL ENTERPRISE 47.01 0.00 0
1316 Durgapur W/S Division Acceptance cum Formal work-Order for the work of ---Sanitary arrangement and plumbing works at Madhabmat Pump house No-1 Tube well No-01(OHR Site) for Augmentation of Kanksa (Zone-II/A) pipe W/S Scheme under DWSD,PHE Dte (SL-02) ORD/000195/2022-2023 1055/DWSD 07/07/2022 25 MUKHERJEE ENTERPRISE 4.82 4.44 100
1317 Durgapur W/S Division Acceptance cum Formal work-Order for the work of ---Sanitary arrangement and plumbing works at Madhabmat Pump house No-2 Tube well No-02 for Augmentation of Kanksa (Zone-II/A) pipe W/S Scheme under DWSD,PHE Dte (SL-03) ORD/000196/2022-2023 1056/DWSD 07/07/2022 25 GHOSH & ROY ENTERPRISE 4.82 4.44 100
1318 Durgapur W/S Division Acceptance cum Formal work-Order for the work of ---Sanitary arrangement and plumbing works at Sarada Pally H/W Site Pump house No-3 for Augmentation of Kanksa (Zone-II/D) pipe W/S Scheme under DWSD,PHE Dte (SL-04) ORD/000197/2022-2023 1054/DWSD 07/07/2022 25 CHATTERJEE CONSTRUCTION 4.82 4.43 100
1319 Durgapur W/S Division Acceptance cum formal order for the work of Sanitary arrangement and plumbing works plinth protection ,roof treatment ,drain and other allied works at Sarada Pally H/W Site Pump house No-1 &T.W-01(OHR site) for Augmentation of Kanksa (Zone-II/D) pipe W/S Scheme under DWSD,PHE Dte (SL-05) ORD/000198/2022-2023 1060/DWSD 08/07/2022 25 GHOSH & ROY ENTERPRISE 4.82 4.57 100
1320 Durgapur W/S Division Acceptance cum formal order for the work of Sanitary arrangement and plumbing works at Molandighi H/W site Pump house No-3 Tube well No-03 for Bistupur pipe W/S Scheme under DWSD,PHE Dte (SL-06) ORD/000199/2022-2023 1061/DWSD 08/07/2022 25 DARPAN DAS & CO. 4.82 3.02 0
1321 Durgapur W/S Division Formal order for the work of Restoration of drain PCC road at Roopganj and Arrah repairing of valve chamber ,construction of masonry community tank with supply of 2000 Ltrs PVC tank at Arrah Samshan supply fitting fixing and installation of sluice valve under DWSD,PHE Dte (SL-01) ORD/000200/2021-2022 1640/DWSD 23/11/2021 45 M/S KALYANI ENTERPRISE 12.12 10.04 0
1322 Durgapur W/S Division Acceptance cum formal order for the work of Repairing of MS structural and supplying hoisting 2000 Liters PVC water storage tank and others allied works at Kanksa of Augmentation of Kanksa (Zone-II/C) W/s Scheme under DWSD,PHE Dte (SL-07) ORD/000200/2022-2023 1062/DWSD 08/07/2022 25 SWATI CORPORATION 3.53 3.24 100
1323 Durgapur W/S Division Dismantling of concrete road and bituminous road of Augmentation of Kanksa zone I/B piped W/s Scheme with construction of boundary wall renovation of all existing structure repairing of all retaining structure left out LDS FHTC Reconnection of FHTC at Kanksa (Part),Debipur(Part),Panagarh(Part) ,Prayagpur(Part) mouza of JL-86,87,88 of Kanksa Block under DWSD ,PHE Dte ORD/000200/2023-2024 1090/DWSD 13/07/2023 30 MAK CONSTRUCTION CO. 23.98 23.91 100
1324 Durgapur W/S Division Acceptance cum formal order for the work of Sanitary arrangement and plumbing works at Madhabmat Pump house No-3 Tube well No-03 for Augmentation of Kanksa (Zone-II/A) pipe W/S Scheme under DWSD,PHE Dte (SL-01) ORD/000201/2022-2023 1063/DWSD 08/07/2022 25 A.K.D. ENTERPRISE 4.82 4.42 100
1325 Durgapur W/S Division Replacement of existing pipeline for Physical certificate of HarGhar Jal IN connection of JJM of Augmentation of Kanksa (Zone-I ) piped W/s Scheme under DWSD ,PHE Dte ORD/000201/2023-2024 1092/DWSD 13/07/2023 30 MD AAMIR KHAN 36.07 34.74 100
1326 Durgapur W/S Division Formal order for the work of Additional functional house hod tap connection FHTC in connection with JJM at Nachan mouza (JL-39) under command area of Jamgora-Jagannathpur piped W/s Scheme block -Durgapur-Faridpur under DWSD, PHE Dte (SL-03) ORD/000202/2021-2022 1634/DWSD 22/11/2021 30 BABA LOKENATH ENTERPRISE 11.05 11.10 0
1327 Durgapur W/S Division Acceptance cum formal order for the work of Withdrawing of damaged 160 mm dia UPVC pipe and laying of additional length of pipe at Basudha and Ajodhya and repairing of damaged pipe due to newly constructed WBSRDA road and others allied works of Basudha W/s Scheme under DWSD,PHE Dte (SL-08) ORD/000202/2022-2023 1074/DWSD 12/07/2022 15 MAK CONSTRUCTION CO. 4.26 4.24 0
1328 Durgapur W/S Division Acceptance cum formal order for the work of Sanitary arrangement and plumbing works and other allied works at Sarada Pally H/W Site Pump house No-2 &T.W-02 for Augmentation of Kanksa (Zone-II/D) pipe W/S Scheme under DWSD,PHE Dte (SL-09) ORD/000203/2022-2023 1075/DWSD 12/07/2022 25 MUKHERJEE ENTERPRISE 4.82 4.44 100
1329 Durgapur W/S Division Acceptance cum formal order for the work of Sanitary arrangement and plumbing works at Molandighi H/W site Pump house No-1 Tube well No-01 for Bistupur pipe W/S Scheme under DWSD,PHE Dte (SL-10) ORD/000204/2022-2023 1076/DWSD 12/07/2022 25 CHATTERJEE CONSTRUCTION 4.82 4.23 100
1330 Durgapur W/S Division Formal order for the work of Construction of 500 M3 capacity 20 mtr staging height RCC Over Head Reservoir (OHR) at Mohal under Augmentation of RCFA Part-III (Zone-I/Part-B) W/s Scheme under DWSD, PHE Dte (SL_14) ORD/000207/2022-2023 278/DWSD 16/05/2022 184 RANJIB GHATAK 96.93 82.66 85
1331 Durgapur W/S Division Formal order for the work of Sinking of 4 Nos 200 mm dia river bed tube wells with collecting main in river Ajoy at Pansuili H/W under Augmentation of RCFA Part-III(Zone-I)(Part-B) W/S Scheme under DWSD,PHE Dte. (SL_09) ORD/000208/2022-2023 856/DWSD 24/05/2022 10 RANAJOY ENTERPRISE 19.57 14.03 100
1332 Durgapur W/S Division Formal order for the work of of Sinking of 4 Nos 200 mm dia river bed tube wells with collecting main in river Ajoy at Pansuili H/W under Augmentation of RCFA Part-III(Zone-I)(Part-A) W/S Scheme under DWSD,PHE Dte. (SL_15) ORD/000209/2022-2023 857/DWSD 24/05/2022 15 RANAJOY ENTERPRISE 18.48 14.81 100
1333 Durgapur W/S Division Formal order for the work of Construction of pump house/Chlorine room,sinking tube well of 150 X 80 X 120 mtr depth and supplying laying of HDPE distributing pipe line and providing FHTC at BONAGRAM Mouza of Bonagaram piped W/s Scheme under DWSD, PHE Dte(Part-A ,B & C)(SL-04) ORD/000210/2022-2023 789/DWSD 18/05/2022 45 BISHAL ENTERPRISE 22.78 22.89 100
1334 Durgapur W/S Division Acceptance cum formal order for the work of Balance work for supplying laying and aligning of HDPE distribution pipeline and allied works including FHT C and connection providing to Jamdoba mouzaJLNo-40 andTelipara MouzaJL-41of Telipara W/s Scheme udner DWSD ,PHE Dte ORD/000210/2023-2024 1089/DWSD. 13/07/2023 45 MAK CONSTRUCTION CO. 93.52 90.71 100
1335 Durgapur W/S Division Formal order for the work of laying of distribution system and providing FHTC including reconnection of exiting FHTC from AC pipe line to newly laid different dia HDPE pipe line for Augmentation of Kanksa (Zone-II/Part-C) piped W/S Scheme under DWSD ,PHE Dte (SL-05) ORD/000211/2022-2023 1161/DWSD 01/08/2022 4 BRINDABAN KONAR 216.66 202.61 80
1336 Durgapur W/S Division Additional work for connection of OHR to distribution main and supplying and laying of UPVC pipe line and laying of 600 mm dia RCC NP3 hume pipe modern hydraulic Jack pushing method including laying of 250 mm dia MS pipe with necessary allied works at Mohal OHR to Gobindapur under Augmentation of RCFA Part-III (Zone-II) Piped W/s Scheme under DWSD,PHE Dte ORD/000213/2023-2024 1448/DWSD 25/08/2023 30 SAIKAT RAY 11.66 0.00 0
1337 Durgapur W/S Division 1 (One) No Trial bore by DR method using rig machine at Dwandeswar ,Block-Kanksa under Augmentation of Dandeswar PWSS under DWSD,PHE Dte ORD/000214/2023-2024 1446/DWSD 25/08/2023 15 M/S BADAL GHOSH 1.00 1.00 100
1338 Durgapur W/S Division Additional work supplying and laying of UPVC pipe le and laying with necessary allied works at Mohal ,Gobindapur under Augmentation of RCFA Part-III (Zone-II) (Part-B) Piped W/s Scheme under DWSD,PHE Dte ORD/000216/2023-2024 1452/DWSD 25/08/2023 25 M/S BADAL GHOSH 9.78 9.72 100
1339 Durgapur W/S Division Additional works for supplying laying of HDPE pipe line including MS pipe lying and fabricating and other allied works at Bistupur under Augmentation of Bistupur piped W/s Scheme under DWSD,PHEDte . ORD/000217/2023-2024 1453/DWSD 25/08/2023 25 MRITYUNJOY MUKHERJEE AND CO 18.95 18.93 100
1340 Durgapur W/S Division Hiring of LUXURY Diesel Ambassador Car including higher model 2012 onwards of Diesel Ambassador or equivalent for official use (Inspection Vehicle) of Assistant Engineer for the office of the Executive Engineer ,Durgapur Water Supply Division, Public Health Engineering (w.e.f 01.09.2022 to 28.02.2023). (Sl-01) ORD/000218/2022-2023 1236/DWSD 17/08/2022 184 BIPLAB BANERJEE 0.82 2.40 0
1341 Durgapur W/S Division Additional repairing and replacement and restoration due to pipe line laying and pavers block and making platform including extra deapth of TW at Jamuna village and other allied works under providing water supply under Retrofitting of Jemua piped W/s Scheme under DWSD,PHE Dte ORD/000218/2023-2024 1445/DWSD 25/08/2023 15 SATYAM POWER 3.43 3.43 100
1342 Durgapur W/S Division Hiring of LUXURY Diesel Ambassador Car including higher model 2012 onwards of Diesel Ambassador or equivalent for official use for the Executive Engineer, DWSD,PHE Dte ADDA Administrative building 2nd Floor, EPIP Complex,Banskopa,DGP-12 (w.e.f 18.08.2022 to 17.02.2023). (SL-02) ORD/000219/2022-2023 1237/DWSD 17/08/2022 184 PRAMIT CHATTERJEE 0.82 2.38 0
1343 Durgapur W/S Division Additional work for UPVC pipe line and laying with necessary allied works at Ramnagar (existing OHR Part-2A) under Augmentation of RCFA Part-III (Zone-II) Piped W/s Scheme under DWSD,PHE Dte ORD/000219/2023-2024 1447/DWSD 25/08/2023 25 RANJIB GHATAK 9.61 9.60 100
1344 Durgapur W/S Division Formal order for the work of laying distribution system rising main construction of 250 M3 Over Head Reservoir with 20 Mtr staging height including soil investigation ,construction of Pump House (5.4X3.6mtr) with FHTC for Amlajora piped W/s Scheme under DWSD,PHE Dte ,Dist-Paschim Bardhaman. ORD/000220/2022-2023 1175/DWSD 02/08/2022 12 RANADHIR SINHA 426.89 287.14 100
1345 Durgapur W/S Division Acceptance cum formal order for the work for installation and fabrication of MS structural work and solar panel at Biharpur and Babnabera FP school under Augmentation of Bistupur piped W/s Scheme under DWSD, PHE Dte ORD/000220/2023-2024 1454/DWSD 25/08/2023 15 M/S MONDAL ENTERPRISE 5.35 5.35 100
1346 Durgapur W/S Division Formal order for the work of laying distribution system, Rising main construction of 350 M3 Over Head Reservoir with 20 Mtr staging height including soil investigation ,construction of Pump House (5.4X3.6mtr) with Sanitary and water supply arrangement & construction of Pump house (3.6X3.00 m) with FHTC for NAPARA piped W/s Scheme under DWSD,PHE Dte ,Dist.-Paschim Bardhhaman. ORD/000221/2022-2023 1174/DWSD 02/08/2022 12 SK. ALIM 522.15 514.40 100
1347 Durgapur W/S Division Acceptance cum formal work order for the work providing functional household tap connection (FHTC) in connection with JAL JEEBAN MISSION(JIM) for Bankati mouza (JL-33)under command area of Basudha W/s Scheme Kanksa Block under Durgapur W/S Division, PHE Dte(SL-18) ORD/000222/2020-2021 1159/DWSD 28/10/2020 45 BISHAL ENTERPRISE 14.60 26.56 0
1348 Durgapur W/S Division Acceptance cum formal order for the work of Sinking of 2 Nos tube well 250 mm X 150 mm tube well 120 mtr depth by Direct rotary Rig method using PVC pipe and prepacked resin bonded gravel filter for Shyambazar piped W/s Scheme under DWSD ,PHE Dte (SL-01) ORD/000222/2022-2023 1233/DWSD 17/08/2022 15 M/S. D. PALIT & CO. 14.76 13.63 0
1349 Durgapur W/S Division Acceptance cum formal order for the work of Additional work for collecting main with manifold for IEP at Ramnagar H/W site and DI distribution line at ROB new culvert portion under Augmentation of RCFA Part-III (Zone-II) Piped W/s Scheme under DWSD,PHE Dte ORD/000222/2023-2024 1499/DWSD 04/09/2023 15 RANJIB GHATAK 19.40 17.60 100
1350 Durgapur W/S Division Acceptance cum formal order for the work of sinking of 2 Nos tube well 250 mm X 150 mm tube well 120 mtr depth by Direct rotary Rig method using PVC pipe and prepacked resin bonded gravel filter for Amlajora piped W/s Scheme under DWSD ,PHE Dte (SL-02) ORD/000223/2022-2023 1234/DWSD 17/08/2022 15 JOY GURU ENTERPRISE 14.68 14.14 0
1351 Durgapur W/S Division Acceptance cum formal order for the work of renovation and modification of administrative office at PHE complex Nababhat (2nd Floor) in connection with Augmentation of Bistupur PWSS under DWSD,PHE Dte. ORD/000223/2023-2024 1510/DWSD 07/09/2023 25 SANDIPAN SENGUPTA 14.99 13.91 80
1352 Durgapur W/S Division Acceptance cum formal order for the work Sinking of 2 Nos tube well 250 mm X 150 mm tube well 120 mtr depth by Direct rotary Rig method using PVC pipe and prepacked resin bonded gravel filter for Dandeswar piped W/s Scheme under DWSD ,PHE Dte (SL-03) ORD/000224/2022-2023 1240/DWSD 18/08/2022 15 M/S BADAL GHOSH 14.75 13.30 0
1353 Durgapur W/S Division Acceptance cum formal order for the work of Sinking of 2 Nos tube well 250 mm X 150 mm tube well 120 mtr depth by Direct rotary Rig method using PVC pipe and prepacked resin bonded gravel filter for Birudiha piped W/s Scheme under DWSD ,PHE Dte (SL-04) ORD/000225/2022-2023 1241/DWSD 18/08/2022 15 MD AAMIR KHAN 14.75 14.30 0
1354 Durgapur W/S Division Acceptance cum formal order for the work of Sinking of 2 Nos tube well 250 mm X 150 mm tube well 120 mtr depth by Direct rotary Rig method using PVC pipe and prepacked resin bonded gravel filter for Bamunara piped W/s Scheme under DWSD ,PHE Dte (SL-05) ORD/000226/2022-2023 1242/DWSD 18/08/2022 15 AHS R INFRA PRIVATE LIMITED 14.76 13.36 0
1355 Durgapur W/S Division Acceptance cum formal order for the work of Sinking of 1 no Tubewell for Triat Bore 150 mm. big dia. Tube wel 90 mtr deep by Direct Rotary Rig methed at Akandara for Jem Piped Water Supply Scheme under Durgapur W/S Division, PHE Dte.(Sl-02) ORD/000226/2023-2024 48-SPOT/DWSD 03/07/2023 15 M/S BADAL GHOSH 1.00 1.00 100
1356 Durgapur W/S Division Acceptance cum formal order for the work of Cleaning the chokage of different dia pipeline at Gourbazar area under Durgapur W/S Divn,PHE Dte (Sl- 02) ORD/000227/2023-2024 1392/DWSD 16/08/2023 10 GHOSH & ROY ENTERPRISE 0.99 0.99 100
1357 Durgapur W/S Division Acceptance cum formal order for the work of Sinking of 2 Nos tube well 250 mm X 150 mm tube well 120 mtr depth by Direct rotary Rig method using PVC pipe and prepacked resin bonded gravel filter for Jatgoria piped W/s Scheme under DWSD ,PHE Dte(SL-07) ORD/000229/2022-2023 1254/DWSD 23/08/2022 15 RANJIB GHATAK 14.75 14.03 100
1358 Durgapur W/S Division Acceptance cum formal order for the work of Providing Functional House Hold Tap Connection (FHTC) in connection with Jal Jeevan Mission for Pratabpur Mouza (JL-48) under retrofitting of Jemua Piped Water Supply Scheme under Durgapur Faridpur Block under DWSD PHE Dte.(Sl-04) ORD/000229/2023-2024 1394/DWSD 16/08/2023 10 GHOSH & ROY ENTERPRISE 0.96 0.96 100
1359 Durgapur W/S Division Acceptance cum formal order for the work of Sinking of 2 Nos tube well 250 mm X 150 mm tube well 120 mtr depth by Direct rotary Rig method using PVC pipe and prepacked resin bonded gravel filter for Napara piped W/s Scheme under DWSD ,PHE Dte (SL-08) ORD/000230/2022-2023 1255/DWSD 23/08/2022 15 SK. ALIM 14.76 14.73 0
1360 Durgapur W/S Division Supplying aligning and laying of 150/250 mm dia MS pipe at Telipara under Augmentation of Telipara piped W/s Scheme under DWSD ,PHE Dte ORD/000231/2023-2024 1559/DWSD 20/09/2023 10 M/S MONDAL ENTERPRISE 3.55 1.01 100
1361 Durgapur W/S Division Acceptance cum formal order for the work of Sinking of 1 Nos tube well 300 mm X 200 mm tube well 150 mtr depth by Direct rotary Rig method using PVC pipe and fiber galss reinforced epoxy resin slotted at existing tube well no-02 at near Railine under Augmentation of Kanksa (Z-II/Part-D) piped W/s Scheme under DWSD ,PHE Dte (SL-13) ORD/000232/2022-2023 1262/DWSD 25/08/2022 15 JOY GURU ENTERPRISE 10.99 10.48 0
1362 Durgapur W/S Division Formal order for the work of Construction of pump house/Chlorine room,sinking tube well of 150 X 80 X 120 mtr depth and supplying laying of HDPE distributing pipe line and providing FHTC at Garadaha Mouza of Garadaha piped W/s Scheme under DWSD, PHE Dte (Part-A ,B & C) (SL-03) ORD/000237/2022-2023 775/DWSD 17/05/2022 45 SHWET BARANI 38.51 34.00 0
1363 Durgapur W/S Division Repairing and replacement and installation of Water supply arrangement at Kanchanpur FP School to provide water supply to school ,Block-Kanksa,Dist-Paschim Bardhhaman under Augmentation of Kanchanpur piped W/s Scheme under DWSD, PHE Dte ORD/000243/2023-2024 1619/DWSD 03/10/2023 30 BISHAL ENTERPRISE 2.23 2.23 100
1364 Durgapur W/S Division Acceptance cum formal work-order for the work providing functional household tap connection (FHTC) in connection with JAL JEEBAN MISSION(JIM) at Kalikapur mouza (JL-30) under command area of Jamgora-Jagannathpur piped W/s Scheme Durgapur-Faridpur Block under Durgapur W/S Division, PHE Dte (SL-02) ORD/000247/2020-2021 1304/DWSD 09/12/2020 45 M/S MONDAL ENTERPRISE 11.59 23.85 0
1365 Durgapur W/S Division Acceptance cum formal work-order for the work of Providing functional household tap connection (FHTC) in connection with JAL JEEBAN MISSION(JIM) at Banshia mouza (JL-31) under command area of Jamgora-Jagannathpur piped W/s Scheme Durgapur-Faridpur Block under Durgapur W/S Division, PHE Dte.(SL-03) ORD/000248/2020-2021 1305/DWSD 09/12/2020 45 BABA LOKNATH ENTERPRISE 17.74 36.51 0
1366 Durgapur W/S Division Formal order for the work of laying distribution system ,Rising main ,constrcution of 250 M3 Reservoir with 20 mtr staing height including soil inverstigation ,construction of Pump house (5.4X3.60) with sanitary and Water supply arrangement and construction of Pump house (3.60 X 3.00 m) wiht FHTC for Birudiha piped W/s Scheme under DWSD ,PHE Dte (New Scheme). ORD/000250/2022-2023 1437/DWSD 13/10/2022 365 KHAN ENTERPRISE 524.96 477.66 100
1367 Durgapur W/S Division Formal order for the work of supplying ,laying of distribution system and providing functional house hold tap connection (FHTC) including reconnection of existing FHTC from AC pipe line to newly laid different dia HDPE pie line for Kanksa (zone-II/A) piped W/s Scheme under DWSD,PHE Dte (Augmentation Scheme) Dist.-Paschim Bardhhaman. ORD/000251/2022-2023 1361/DWSD 20/09/2022 122 SAIKAT RAY 236.37 239.55 0
1368 Durgapur W/S Division Formal order for the work of Laying distribution system and providing functional house hold tap connection (FHTC) including reconnection of exiting FHTC form AC pipe line to newly laid different dia pipe line for Kanksa (Zone-II/Part-B) under DWSD ,PHE Dte (Augmentation Scheme) ORD/000252/2022-2023 1449/DWSD 17/10/2022 123 MD AAMIR KHAN 217.39 222.62 0
1369 Durgapur W/S Division Acceptance cum formal work order for the work of providing functional household tap connection (FHTC) in connection with JAL JEEBAN MISSION(JIM) at Arati mouza (JL-54) under command area of Gourbazar-Ichhapur piped W/s Scheme Durgapur-Faridpur Block under Durgapur W/S Division, PHE Dte.(SL-09) ORD/000253/2020-2021 1310/DWSD 09/12/2020 45 BISHAL ENTERPRISE 26.15 52.59 0
1370 Durgapur W/S Division Formal order for the work of Additional work of laying of HDPE distribution pipe line 75/90 mm dia and providing FHTC at Kotalpukur (JL-30),Nimtakuri(JL-32) & Masna(JL-31) mouzas of Kotalpukur piped W/s Scheme under DWSD,PHE Dte (SL-03) ORD/000253/2022-2023 1426/DWSD 08/10/2022 10 JOY GURU ENTERPRISE 12.21 12.21 0
1371 Durgapur W/S Division Acceptance order for the work of Construction of of 500 M3 capacity ,20 Mtr staging height RCC Over Head Reservoir at Molandighi of Bistupur piped W/S Scheme under Durgapur W/S Division, PHE Dte .(SL-01) ORD/000256/2021-2022 1650/DWSD 25/11/2021 120 MRITYUNJOY MUKHERJEE AND CO 92.97 75.29 100
1372 Durgapur W/S Division Acceptance cum formal work order for the work of providing functional household tap connection (FHTC) in connection with JAL JEEBAN MISSION(JIM) at Patsaora mouza (JL-53) under command area of Gourbazar-Ichhapur piped W/s Scheme Durgapur-Faridpur Block under Durgapur W/S Division, PHE Dte.(SL-13) ORD/000257/2020-2021 1316/DWSD 09/12/2020 45 SHWET BARANI 19.08 30.69 50
1373 Durgapur W/S Division Formal order for the work of Sinking of 1 No (300X200 mm) dia tube well 120 mtr deep by DR rig method using PVC pipe and fiber glass reinforced epoxy resin slotted at Tube well no 3 site of Bistupur piped W/s Scheme under Durgapur W/s Division, PHE Dte (SL-02) ORD/000257/2021-2022 1679/DWSD 01/12/2021 25 SK. ALIM 9.32 6.70 0
1374 Durgapur W/S Division Acceptance cum formal order for the work of Additional FHTC and necessary allied works at Silampur(JL-90) mouza of Augmentation of Kanksa (Zone-I) piped W/s Scheme under DWSD,PHE Dte (SL-01) ORD/000257/2022-2023 1574/DWSD 02/11/2022 15 MD AAMIR KHAN 7.26 7.12 100
1375 Durgapur W/S Division Acceptance cum formal work-order for the work of providing functional household tap connection (FHTC) in connection with JAL JEEBAN MISSION(JIM) at Jotbalaram & Amdohi mouza (JL-08 & 25) under command area of Gourbazar-Ichhapur piped W/s Scheme Durgapur-Faridpur Block under Durgapur W/S Division, PHE Dte.(SL-14) ORD/000258/2020-2021 1317/DWSD 09/12/2020 45 JOY GURU ENTERPRISE 25.99 47.60 0
1376 Durgapur W/S Division Formal order for the work of Sinking of 2 Nos (300X200 mm) dia tube well 120 mtr deep by DR rig method using PVC pipe and fiber glass reinforced epoxy resin slotted at tube well No-01 & 02) Molandighi of Bistupur piped W/s Scheme under Durgapur W/s Division, PHE Dte (SL-03) ORD/000258/2021-2022 1676/DWSD 30/11/2021 35 M/S. D. PALIT & CO. 18.62 13.20 100
1377 Durgapur W/S Division Acceptance cum formal order for the work of Additional FHTC and necessary allied works at Ayma Biswanathpur(JL-82),Ganbil(JL-83) mouza of Augmentation of Kanksa (Zone-I) piped W/s Scheme under DWSD,PHE Dte (SL-02) ORD/000258/2022-2023 1575/DWSD 02/11/2022 15 TARA PRASAD SARKAR 23.21 23.20 100
1378 Durgapur W/S Division Acceptance cum formal work order for the work of providing functional household tap connection (FHTC) in connection with JAL JEEBAN MISSION(JJM) at Kanchanpur mouza (JL-02) under command area of Kanchanpur piped W/s Scheme of Kanksa Block under Durgapur W/S Division, PHE Dte.(SL-15) ORD/000259/2020-2021 1318/DWSD 09/12/2020 45 MRITYUNJOY MUKHERJEE AND CO 17.56 29.42 0
1379 Durgapur W/S Division Formal order for the work of Additional work for providing FHTC in connection with JJM for Radhamohanpur Mouza(JL-36) under command area of Basudha piped W/S Scheme ,Block-Kanksa under DWSD,PHE Dte (SL-04) ORD/000259/2021-2022 1706/DWSD 08/12/2021 30 MD AAMIR KHAN 24.05 24.60 0
1380 Durgapur W/S Division Acceptance cum formal order for the work of Additional work for supplying and laying of different dia HDPE pipe line with FHTC and necessary allied Works at Anandapur (JL-89) mouza of Augmentation of Kanksa (Zone-I) piped W/s Scheme under DWSD,PHE Dte. (SL-03) ORD/000259/2022-2023 1576/DWSD 02/11/2022 847 RANJIB GHATAK 12.79 0.00 100
1381 Durgapur W/S Division Formal order for the work of Additional work for providing FHTC in connection with JJM for Shilampur Mouza(JL-90) under command area of Kanksa (Zone-I) piped W/S Scheme ,Block-Kanksa under DWSD,PHE Dte ORD/000260/2021-2022 1707/DWSD 08/12/2021 30 MD AAMIR KHAN 42.05 43.15 0
1382 Durgapur W/S Division Acceptance cum formal order for the work of supplying and laying of 150 mm dia MS water carrying pipe with making necessary bend and others allied works at node point -414,323 and 540 near Kuldiha boys club ,Kuldiha More bus stand and Kuldiha bordoba More, Kanksa Block under Bistupur piped W/S Scheme under DWSD,PHE Dte. (SL-04) ORD/000260/2022-2023 1577/DWSD 02/11/2022 15 TARA CONSTRUCTION 37.40 33.92 0
1383 Durgapur W/S Division Formal order for the work of Replaying of 160 mm /110 mm dia HDPE main pipe line at Panagarh to Shilampur road of Kanksa (Zone-I) W/s Scheme under DWSD, PHE Dte ORD/000261/2021-2022 1708/DWSD 08/12/2021 30 MAK CONSTRUCTION CO. 9.64 9.83 0
1384 Durgapur W/S Division Formal order for the work of Laying of 600 mm dia RCC (NP3) Hume pipe by modern Hydraulic Jack pushing method including laying 150 mm dia MS pipe line at DVC More over Suri road (NH-60) for ROB under Augmentation of RCFA Part-III W/s Scheme (Zone-II) under DWSD, PHE Dte (SL_12) ORD/000261/2022-2023 872/DWSD 26/05/2022 15 RANJIB GHATAK 13.63 13.49 100
1385 Durgapur W/S Division Acceptance cum formal work order for the work of Providing functional household tap connection (FHTC) in connection with JAL JEEBAN MISSION(JJM) at Basudha mouza (JL-35) under command area of Basudha piped W/s Scheme of of Kanksa Block under Durgapur W/S Division, PHE Dte (SL-18) ORD/000263/2020-2021 1321/DWSD 09/12/2020 45 M/S S. CHOUDHURY 42.77 82.12 0
1386 Durgapur W/S Division Acceptance cum formal work order for the work of providing functional household tap connection (FHTC) in connection with JAL JEEBAN MISSION(JJM) at Pryagpur mouza (JL-88) under command area of Kanksa Zone-II(Ph-II) (Pt-A) piped W/s Scheme of of Kanksa Block under Durgapur W/S Division, PHE Dte.(Sl-19) ORD/000264/2020-2021 1322/DWSD 09/12/2020 45 DAS & CHAKRABORTY 43.55 87.22 0
1387 Durgapur W/S Division Formal order for the work of laying distribution system rising main construction of 150 M3 reservoir with 20 mtrs staging height including soil investigation construction of Pump house (5.4 m X 3.60 m) with sanitary and water supply arrangement and construction of pump house(3.60 X 3.00 m) with FHTC for Dandeswar water Supply schme under DWSD ,PHE Dte (NS) ORD/000264/2022-2023 1614/DWSD 21/11/2022 365 POWER TOOLS AND ENGINEERING 164.79 139.27 80
1388 Durgapur W/S Division Acceptance cum formal work order for the work of providing functional household tap connection (FHTC) in connection with JAL JEEBAN MISSION(JJM) at Debipur mouza (JL-87) under command areaof Kanksa Zone-II(Ph-II) piped W/s Scheme of of Kanksa Block under Durgapur W/S Division, PHE Dte.(SL-21) ORD/000265/2020-2021 1313/DWSD 09/12/2020 45 M/S. D. PALIT & CO. 43.64 82.83 0
1389 Durgapur W/S Division Formal order for the work of Supplying, laying and aligning of HDPE distribution pipe line and allied works construction 400 M3 OHR with 20 mtr staging height including soil investigation and construction of pump house (5.40 m X 3.60 m) with sanitary and water supply arrangement and construction of pump house (3.60X3.00 m) with FHTC for Bamunara piped water Supply scheme under DWSD ,PHE Dte (NS) ORD/000265/2022-2023 1438/DWSD 13/10/2022 1024 HANNAN BUILDERS PVT. LTD. 658.55 515.69 100
1390 Durgapur W/S Division Acceptance cum formal work order for the work of providing functional household tap connection (FHTC) in connection with JAL JEEBAN MISSION(JJM) at Panagarh mouza (JL-85) under command area of Kanksa Zone-II(Ph-II) piped W/s Scheme of of Kanksa Block under Durgapur W/S Division, PHE Dte.(SL-20) ORD/000266/2020-2021 1314/DWSD 09/12/2020 45 UMWELT ENGINEER PVT LTD 43.60 89.47 0
1391 Durgapur W/S Division Acceptance cum formal order for the work of Supplying and laying of different dia UPVC pipe line with necessary allied works at Rangamatia (JL-10),Benebandhi(JL-11) ,Maheshpur(JL-12) mouza of Augmentation of RCFA Part-III W/s Scheme (Zone-I)/Part-A) W/S Scheme under DWSD,PHE Dte.(SL-02) ORD/000266/2022-2023 1005/DWSD 28/06/2022 15 KIRON ENTERPRISE 19.46 16.77 85
1392 Durgapur W/S Division Formal order for the work of laying distribution system ,rising main construction of 150 M3 with 20 mtr staging height including soil investigation construction of Pump house (5.4X3.6 m) with sanitary and Water supply arrangement and construction of pump house (3.6X3.00 mtr) for Shyambazar W/s Scheme under DWSD ,PHE Dte (New Scheme) ORD/000267/2022-2023 1648/DWSD 02/12/2022 2190 DUTTA ENTERPRISE 213.72 194.67 100
1393 Durgapur W/S Division Formal order for the work of implementation of ground water based mini piped water supply scheme in 7(Seven) nos villages under Durgapur-Faridpur and Kanksa blocks max 100 HH under DWSD,PHE Dte in connection with Jal Swapna ORD/000268/2022-2023 1162/DWSD 01/08/2022 90 MONDAL PRECISION PVT LTD 275.32 236.57 100
1394 Durgapur W/S Division Acceptance cum formal work order for the work of Providing functional household tap connection (FHTC) in connection with JAL JEEBAN MISSION(JJM) at Annandapur mouza (JL-89) under command area of Kanksa Zone-I piped W/s Scheme of of Kanksa Block under Durgapur W/S Division, PHE Dte.(SL-24) ORD/000269/2020-2021 1324/DWSD 09/12/2020 45 M/S KALYANI ENTERPRISE 18.17 18.25 0
1395 Durgapur W/S Division Formal order for the work laying distribution system rising main ,construction of 100M3 reservoir with 20mtr staging height including soil investigation construction of pump house (5.40X3.60 m) with sanitary and water supply arrangement and construction of pump house (3.6 X 3.00 m) for Jatgoria W/s Scheme ,Kanksa block under DWSD,PHE Dte (NS) ORD/000269/2022-2023 1656/DWSD 05/12/2022 365 SUPER SKILL 170.87 109.73 45
1396 Durgapur W/S Division Acceptance cum formal order for the work of supplying and Laying of Different dia UPVC pipe line With necessary allied works at Pandabeswar Block of RCFA Pt-III, Zone II A (From Ext. OHR Ramnagar) (Part - 1A) Under Augmentation of RCFA Pt - III Zone - II W/S Scheme (JJM) under Durgapur Water Supply Division, PHE Dte. ORD/000270/2022-2023 1684/DWSD 09/12/2022 45 M/S KALYANI ENTERPRISE 43.17 41.37 100
1397 Durgapur W/S Division Formal order for the work of providing FHTC With necessary allied works at Pandabeswar Block of RCFA Pt-III, Zone II A (From Ext. OHR Ramnagar ) (Part - 1B) Under Augmentation of RCFA Pt - III Zone - II W/S Scheme (JJM) under Durgapur Water Supply Division, PHE Dte.(DL-02) ORD/000271/2022-2023 272/DWSD 16/02/2023 45 GHOSH ENTERPRISE 31.84 15.06 100
1398 Durgapur W/S Division Acceptance cum formal order for the work of Supplying and Laying of Different dia UPVC pipe line With necessary allied works at Pandabeswar Block of RCFA Pt-III, Zone II A (From Ext. OHR Ramnagar )(Part - 2 A) Under Augmentation of RCFA Pt - III Zone - II W/S (JJM) Scheme under Durgapur Water Supply Division, PHE Dte.(S-3) ORD/000272/2022-2023 1686/DWSD 09/12/2022 45 AMAR CONSTRUCTION 45.34 42.47 80
1399 Durgapur W/S Division Continuation order for the work of Hiring of Luxury diesel Ambassador car including higher model -2012 on wards of diesel Ambassador or equivalent for official use of the Assistant Engineer of EE/DWSD/PHE Dte for the use of the Office of the EE/DWSD/PHE Dte ADDA Adm: Building EPIP Complex ,Banskopa ,Durgapur-713212(w.e.f 01.11.2023 to 30.04.2024) (Vehicle No-WB37D6848) ORD/000272/2023-2024 1702/DWSD 31/10/2023 182 PRAMIT CHATTERJEE 0.82 1.57 60
1400 Durgapur W/S Division Acceptance cum formal order for the work of additional laying of pipe line and repairing of damage road with concrete work at Sarpi (Mouza-35) under command area of retrofitting of improvement of Gourbazar-Ichhapur W/s Scheme under DWSD ,PHE Dte (SL-02) ORD/000273/2021-2022 1553/DWSD 27/10/2021 20 K.M. ENTERPRISE 2.30 2.29 0
1401 Durgapur W/S Division Formal order for the work of Providing FHTC With necessary allied works at Pandabeswar Block of RCFA Pt-III, Zone II A (From Ext. OHR Ramnagar )(Part - 2 B) Under Augmentation of RCFA Pt - III Zone - II W/S Scheme(JJM) under Durgapur Water Supply Division, PHE Dte.(Sl-4) ORD/000273/2022-2023 427/DWSD 13/03/2023 45 TARA PRASAD SARKAR 34.36 22.91 100
1402 Durgapur W/S Division Acceptance cum formal order for the work of Supplying aligning and laying of 150/250 mm dia MS pipe at Telipara under Augmentation of Telipara piped W/s Scheme under DWSD ,PHE Dte ORD/000273/2023-2024 1560/DWSD 20/09/2023 10 M/S MONDAL ENTERPRISE 3.55 0.00 0
1403 Durgapur W/S Division Acceptance cum formal order for the work of Additional work for restoration and repairing of pipe line and construction of Sluice Valve chamber and cement concrete and other allied works for Augmentation of Gopalpur W/S Scheme under DWSD ,PHE Dte . ORD/000274/2023-2024 1561/DWSD 20/09/2023 685 AMAR CONSTRUCTION 5.15 0.00 100
1404 Durgapur W/S Division Acceptance cum formal order for the work of Supplying and Laying of Different dia UPVC pipe line With necessary allied works at Pandabeswar Block of RCFA Pt-III,Zone II A (From Ext. OHR Ramnagar )(Part - 3 A) Under Augmentation of RCFA Pt - III Zone - II W/S Scheme (JJM) under Durgapur Water Supply Division, PHE Dte. ORD/000275/2022-2023 1688/DWSD 09/12/2022 966 MAK CONSTRUCTION CO. 75.68 62.05 100
1405 Durgapur W/S Division Acceptance cum formal order for the work of Additional work at Danya under Augmentation of RCFA Part-III (Zone-II) W/S Scheme (JJM) under DWSD,PHE Dte ORD/000275/2023-2024 1562/DWSD 20/09/2023 15 MAITO MAA ENTERPRISE 2.99 2.99 100
1406 Durgapur W/S Division Formal order for the work of providing FHTC With necessary allied works at Pandabeswar Block of RCFA Pt-III,Zone II A(From Ext. OHR Ramnagar )(Part - 3 B) Under Augmentation of RCFA Pt - III Zone - II W/S Scheme (JJM) under Durgapur Water Supply Division, PHE Dte.. ORD/000276/2022-2023 26/DWSD 09/01/2023 45 KIRON ENTERPRISE 39.50 26.20 100
1407 Durgapur W/S Division Acceptance cum formal order for the work of Emergency repairing and etc allied works at different places within Basudha area,Domra area ,Tilakchandrapur area ,Krikrishnapur and Roopganj area under DWSD,PHE Dte ORD/000276/2023-2024 1562/A/DWSD 20/09/2023 15 GHOSH ENTERPRISE 3.29 3.28 100
1408 Durgapur W/S Division Constinuation order for the work of Providing functional houe hold tap connection (FHTC) in connection with JJM at Shyamsundarpur mouza(JL-07) block-Durgapur-Faridpur , Dist Paschim Bardhaman under Gourbazar-Ichhapur piped W/s Scheme under DWSD,PHE Dte ORD/000277/2021-2022 1643/DWSD 23/11/2021 10 PRAVAT SARKAR 4.96 4.96 0
1409 Durgapur W/S Division Acceptance cum formal order for the work of Supplying and Laying of Different dia UPVC pipe line With necessary allied works at Pandabeswar Block of RCFA Pt-III,Zone II A (From Ext. OHR Ramnagar )(Part - 4 A) Under Augmentation of RCFA Pt - III Zone - II W/S Scheme (JJM) under Durgapur Water Supply Division, PHE Dte. ORD/000277/2022-2023 1690/DWSD 09/12/2022 45 RANJIB GHATAK 52.17 47.46 70
1410 Durgapur W/S Division Acceptance cum formal order for the work of Balance work of providing FHTC in connection with JJM for Kanksa (Zone-II) Part-B for Augmentation of BISTUPUR W/S Scheme (JJM) under DWSD,PHE Dte. ORD/000277/2023-2024 1563/DWSD 20/09/2023 681 MD AAMIR KHAN 30.61 0.00 0
1411 Durgapur W/S Division Continuation order for the work of Providing FHTC in connection with JJM for Gourbazar-Ichhapur W/s Scheme mouza-Patsaora(JL-53) Part-A block-Durgapur-Faridpur block, Dist.- Paschim Bardhaman under DWSD, PHE Dte ORD/000278/2021-2022 1596/DWSD 08/11/2021 10 SHWET BARANI 4.52 4.46 100
1412 Durgapur W/S Division Formal order for the work of providing FHTC With necessary allied works at Pandabeswar Block of RCFA Pt-III,Zone II A(From Ext. OHR Ramnagar )(Part - 4 B) Under Augmentation of RCFA Pt - III Zone - II W/S Scheme (JJM) under Durgapur Water Supply Division, PHE Dte ORD/000278/2022-2023 46/DWSD 11/01/2023 45 RANJIB GHATAK 36.40 29.81 0
1413 Durgapur W/S Division Acceptance cum formal order for the work of Repairing and road restoration side drainage system and other allied FHTC related works at Patseura village under Augmentation of RCFA Part-III W/s Scheme (Zone-II) under DWSD. ORD/000278/2023-2024 1564/DWSD 20/09/2023 15 SHWET BARANI 3.66 0.00 0
1414 Durgapur W/S Division Acceptance cum formal order for the work of Supplying and Laying of Different dia UPVC pipe line With necessary allied works at Pandabeswar Block of RCFA Pt-III,Zone II A (From Ext. OHR Ramnagar )(Part - 5 A) Under Augmentation of RCFA Pt - III Zone - II W/S Scheme (JJM) under Durgapur Water Supply Division, PHE Dte. ORD/000279/2022-2023 1692/DWSD 09/12/2022 45 BASANTI TRADERS 32.47 23.73 1
1415 Durgapur W/S Division Acceptance cum formal order for the work of Laying of additional distribution pipe line with necessary allied works for shifting of existing line due to ROB at Pandabeswar under RCFA Pt-III (Zone-II) W/s Scheme under DWSD,PHE Dte. (SL-6) ORD/000280/2021-2022 1571/DWSD 27/10/2021 20 RANJIB GHATAK 3.59 3.59 0
1416 Durgapur W/S Division Acceptance cum formal order for the work of Water supply arrangement at Maheshpur village within Durgapur-Faridpur Block to combat waters crisis and protection of RCC Columns within Tumuni river near Jagannathpur village under DWSD, PHE Dte(SL-5) ORD/000281/2021-2022 1572/DWSD 27/10/2021 15 M/S BADAL GHOSH 1.98 1.98 0
1417 Durgapur W/S Division Formal order for the work of Providing FHTC With necessary allied works at Pandabeswar Block of RCFA Pt-III,Zone II A(From Ext. OHR Ramnagar )(Part - 5 B) Under Augmentation of RCFA Pt - III Zone - II W/S Scheme (JJM) under Durgapur Water Supply Division, PHE Dte ORD/000281/2022-2023 270/DWSD 16/02/2023 45 D. S. ENTERPRISE 27.65 12.83 100
1418 Durgapur W/S Division Formal order for the work of Sinking of 2(Two) Nos TW,FHTC,laying Rising main and laying distribution system (LDS) ,construction of boundary wall ,Pump House and restoration of road another allied works for Augmentation of ground water based W/s Scheme for Trilakchandrapur under DWSD,Block-Kanksa,Dist-Paschim Bardhhaman ORD/000281/2023-2024 1826/DWSD 05/12/2023 728 SHWET BARANI 243.78 111.40 100
1419 Durgapur W/S Division Formal order for the work of Providing FHTC With necessary allied works at Pandabeswar Block of RCFA Pt-III, Zone II A(From New. OHR Ramnagar )(Part - 6 B) Under Augmentation of RCFA Pt - III Zone - II W/S Scheme (JJM) under Durgapur Water Supply Division, PHE Dte. ORD/000282/2022-2023 45/DWSD 11/01/2023 45 RANJIB GHATAK 21.38 16.28 85
1420 Durgapur W/S Division Acceptance cum Formal work-Order for the work of ---Replacement of damage existing distribution pipe line with 75 mm UPVC line and necessary allied works at Loudoha village Palpara,Ghosh Para & Banerjee para under RCFA Pt-III W/s Scheme under DWSD ,PHE Dte (SL-3) ORD/000283/2021-2022 1575/DWSD 27/10/2021 15 D. S. ENTERPRISE 4.67 4.66 0
1421 Durgapur W/S Division Formal order for the work of extensioin of pipe line from existing pipe line of Kanksa Zone-II PH-II W/s Scheme to combat draught like situation in Kanksa block to providing FHTC at Debipur mouza JL-87 ,Sharmapara ,Singh para under DWSD,PHE Dte. ORD/000285/2021-2022 1606/DWSD 12/11/2021 20 M/S. D. PALIT & CO. 18.10 18.10 0
1422 Durgapur W/S Division Formal order for the work of Sinking 3(Three) Nos 300X200 mm dia Tube well 210 mtr deep by DR ring method using PVC pipe and fibber glass reinforced epoxy resin slotted at Gopalpur H/W site under Augmentation of Gopalpur piped W/s Scheme under Durgapur W/S Division, PHE Dte. ORD/000286/2021-2022 1749/DWSD 15/12/2021 30 M/S. D. PALIT & CO. 42.11 27.75 100
1423 Durgapur W/S Division Formal for the work of Construction of 500 M3 capacity ,20 Mtr staging height RCC Elevated Over Head Reservoir at Gopalpur under Augmentation of Gopalpur piped W/s Scheme under DWSD, PHE Dte.(SL-02) ORD/000287/2021-2022 1745/DWSD 15/12/2021 184 AMAR CONSTRUCTION 92.00 78.97 0
1424 Durgapur W/S Division Acceptance for the work fabrication and erection of MS structural bridge used to cross 600 mm dia rising main pipe line near Bankura more under surface based W/s Scheme for Panagarh Industrial Park under DWSD,PHE Dte (SL-03) ORD/000288/2021-2022 1715/DWSD 09/12/2021 40 MACHINO TECHNO 68.77 0.00 0
1425 Durgapur W/S Division Acceptance cum formal order for the work of dismantling of abandoned existing structure at Gopalpur H/W site of Augmentation of Gopalpur W/S Scheme under DWSD,PHE Dte.(SL-02) ORD/000289/2021-2022 1660/DWSD 25/11/2021 20 QUICK PAL SUPPLIERS 3.94 3.87 0
1426 Durgapur W/S Division Acceptance cum formal order for the work of supplying and Laying of Different dia UPVC pipe line With necessary allied works at Pandabeswar Block of RCFA Pt-III,Zone II A (From New OHR Ramnagar) (Part - 6 A) Under Augmentation of RCFA Pt - III Zone - II W/S Scheme (JJM) under Durgapur Water Supply Division, PHE Dte. ORD/000289/2022-2023 1696/DWSD 09/12/2022 45 HIRANMAY GHOSH 30.39 29.96 68
1427 Durgapur W/S Division Acceptance cum formal order for the work of Repairing and renovation of pump house with sanitary arrangement at Gopalpur mouza for Augmentation of Gopalpur W/S Scheme under DWSD,PHE Dte.(SL-01) ORD/000290/2021-2022 1661/DWSD 25/11/2021 25 M/S UNIQUE 4.00 3.68 0
1428 Durgapur W/S Division Acceptance cum formal order for the work of Supplying and Laying of Different dia UPVC pipe line With necessary allied works at Pandabeswar Block of RCFA Pt-III,Zone II A (From New OHR Ramnagar) (Part - 7 A) Under Augmentation of RCFA Pt - III Zone - II W/S Scheme (JJM) under Durgapur Water Supply Division, PHE Dte. ORD/000290/2022-2023 1697/DWSD 09/12/2022 45 JAYANTA DATTA 51.74 38.70 65
1429 Durgapur W/S Division Acceptance cum formal order for the work of Supplying and Laying of Different dia UPVC pipe line With necessary allied works at Pandabeswar Block of RCFA Pt-III,Zone II A (From New OHR Ramnagar) (Part - 8A) Under Augmentation of RCFA Pt - III Zone - II W/S Scheme (JJM) under Durgapur Water Supply Division, PHE Dte. ORD/000292/2022-2023 1695/DWSD 09/12/2022 1056 RUBY CONSTRUCTION 51.35 33.70 70
1430 Durgapur W/S Division Acceptance order for the work of providing FHTC With necessary allied works at Pandabeswar Block of RCFA Pt-III,Zone II A(From New. OHR Ramnagar )(Part - 8 B) Under Augmentation of RCFA Pt - III Zone - II W/S Scheme (JJM) under Durgapur Water Supply Division, PHE Dte. ORD/000293/2022-2023 1698/DWSD 09/12/2022 45 ASHA CONSTRUCTION 35.77 23.48 85
1431 Durgapur W/S Division Acceptance cum formal order for the work of Supplying and Laying of Different dia UPVC pipe line With necessary allied works at Pandabeswar Block of RCFA Pt-III,Zone II A (From New OHR Ramnagar) (Part - 9 A) Under Augmentation of RCFA Pt - III Zone - II W/S Scheme (JJM) under Durgapur Water Supply Division, PHE Dte. ORD/000294/2022-2023 1699/DWSD 09/12/2022 45 JOY GURU ENTERPRISE 49.65 43.58 90
1432 Durgapur W/S Division Formal order for the work of Providing additional number of FHTC in connection with JJM for Roopganj mouza(JL-91) with extension of branch pipe line at Roopganj and Arrah under command are a of Roopganj W/S Scheme at Kanksa block under DWSD ,PHE Dte ORD/000295/2021-2022 1783/DWSD 21/12/2021 30 M/S KALYANI ENTERPRISE 17.08 17.39 0
1433 Durgapur W/S Division Formal order for the work of Providing FHTC With necessary allied works at Pandabeswar Block of RCFA Pt-III,Zone II A(From New. OHR Ramnagar )(Part - 9 B) Under Augmentation of RCFA Pt - III Zone - II W/S Scheme (JJM) under Durgapur Water Supply Division, PHE Dte ORD/000295/2022-2023 387/DWSD 01/03/2023 45 JOY GURU ENTERPRISE 26.58 17.48 100
1434 Durgapur W/S Division Formal order for the work of Emergency repairing and restoration of distribution system from command are a of Jagannathpur OHR (Gopendanga ,Kalinagar,Jagannathpur,Kailashpur part) Jamgora-Jagannathpur piped W/s Scheme under DWSD, PHE Dte. ORD/000296/2021-2022 1778/DWSD 20/12/2021 20 M/S BADAL GHOSH 5.54 0.00 0
1435 Durgapur W/S Division Formal for the work of Additional FHTC in connection with JJM at Hetedoba Mouza under command area of Gourbazar-Ichhapur piped W/S Scheme of Durgapur-Faridpur block under DWSD PHE Dte . ORD/000297/2021-2022 1779/DWSD 21/12/2021 25 RANAJOY ENTERPRISE 9.62 8.76 0
1436 Durgapur W/S Division Formal order for the work of Supplying and laying of 110 mm and 90 mm dia UPVC pipe at Bansgora (Main road to Akhrapara) for providing FHTC of Bansgora Mouza JL-38 of Jamgora-Jagannathpur W/s Scheme under DWSD PHE Dte ORD/000298/2021-2022 1775/DWSD 20/12/2021 25 SILPO UDYOG ENGINEERING CONSTRUCTIONS 7.57 7.63 0
1437 Durgapur W/S Division Acceptance cum formal order for the work Supplying and Laying of Different dia UPVC pipe line With necessary allied works at Pandabeswar Block of RCFA Pt-III, Zone II A (From New OHR Ramnagar) (Part - 10 A) Under Augmentation of RCFA Pt - III Zone - II W/S Scheme (JJM) under Durgapur Water Supply Division, PHE Dte. ORD/000298/2022-2023 1701/DWSD 09/12/2022 45 BABA LOKENATH ENTERPRISE 58.48 50.06 75
1438 Durgapur W/S Division Formal order for the work of providing FHTC With necessary allied works at Pandabeswar Block of RCFA Pt-III, Zone II A(From New. OHR Ramnagar )(Part - 10 B) Under Augmentation of RCFA Pt - III Zone - II W/S Scheme (JJM) under Durgapur Water Supply Division, PHE Dte. ORD/000300/2022-2023 391/DWSD 01/03/2023 45 BISHAL ENTERPRISE 38.70 0.00 0
1439 Durgapur W/S Division Formal order for the work of Repairing as well as extension of boundary wall with supply fitting fixing of ornamental Gate at Gopalpur H/W site of Gopalpur Mouza for Augmentation of Gopalpur piped W/s Scheme under DWSD,PHE Dte ORD/000301/2021-2022 1767/DWSD 17/12/2021 30 D. S. ENTERPRISE 8.10 7.18 0
1440 Durgapur W/S Division Formal order for the work of Repairing and renovation of PH with sanitary arrangement as well as boundary wall at PH site (T.No-II & III) of crackly nature of soil according to Deptt drawing no GWSS/EC/PHE Dte /DRG-3/7-8 ,Size-5.9X4.10 m out to out) at Gopalpur mouza for Augmentation of Gopalpur piped W/s Scheme under DWSD,PHE Dte ORD/000302/2021-2022 1737/DWSD 13/12/2021 45 CHANDAN HAZRA 25.78 24.35 100
1441 Durgapur W/S Division Formal order for the work of providing FHTC With necessary allied works at Pandabeswar Block of RCFA Pt-III,Zone II A(From New. OHR Ramnagar )(Part - 7 B) Under Augmentation of RCFA Pt - III Zone - II W/S Scheme (JJM) under Durgapur Water Supply Division, PHE Dte. ORD/000302/2022-2023 426/DWSD 13/03/2023 45 DIP CONSTRUCTION 34.53 14.98 65
1442 Durgapur W/S Division Formal order for the work of Laying and aligning of DI K9 rising main pipe line supplying DI Specials valves and allied works under command area of Gopalpur mouza for Augmentation of Gopalpur piped W/s Scheme under DWSD,PHE Dte ORD/000303/2021-2022 1758/DWSD 16/12/2021 30 RANJIB GHATAK 15.53 0.00 0
1443 Durgapur W/S Division Acceptance cum formal order for the work of Supplying and Laying of Different dia UPVC pipe line With necessary allied works at Pandabeswar Block of RCFA Pt-III, Zone II B (From Mahal OHR) (Part - 11 A) Under Augmentation of RCFA Pt - III Zone - II W/S Scheme (JJM) under Durgapur Water Supply Division, PHE Dte. ORD/000303/2022-2023 1704/DWSD 09/12/2022 45 AMARANJALI CONSTRUCTION 37.90 31.57 65
1444 Durgapur W/S Division Formal order for the work of Hire & labour charges for staging and scaffolding bamboo barricading and removal of rubbish for dismantling of RCC elevated 350 M3 OHR of 20 mtr staging height at Gopalpur H/W Site under DWSD ,PHE Dte ORD/000304/2021-2022 1765/DWSD 17/12/2021 30 TARA CONSTRUCTION 12.55 0.00 0
1445 Durgapur W/S Division Formal order for the work of Providing FHTC With necessary allied works at Pandabeswar Block of RCFA Pt-III, Zone II B (From Mahal OHR) (Part - 11 B) Under Augmentation of RCFA Pt - III Zone - II W/S Scheme (JJM) under Durgapur Water Supply Division, PHE Dte. ORD/000304/2022-2023 428/DWSD 13/03/2023 45 AMARANJALI CONSTRUCTION 31.13 12.76 80
1446 Durgapur W/S Division Acceptance cum formal work order for the work of providing functional household tap connection (FHTC) in connection with JAL JEEBAN MISSION(JIM) for Kanksa (CT) mouza (JL-86) (Pt-E) under command area of Kanksa Zone-II (Ph-I) W/S Scheme at Kanksa Block under Durgapur W/S Division, PHE Dte (SL-01) ORD/000305/2020-2021 1431/DWSD 28/12/2020 60 SWATI CORPARATION 42.78 87.48 0
1447 Durgapur W/S Division Continuation order for the work of Providing functional household tap connection (FHTC) in connection with JAL JEEBAN MISSION(JIM) for Shyamsundarpur mouza (JL-07) under command area of Gourbazar-Ichhapur W/s Scheme of Durgapur-Faridpur Block under Durgapur W/S Division, PHE Dte (Part-C). ORD/000305/2021-2022 1735/DWSD 13/12/2021 10 PRAVAT SARKAR 4.97 4.97 0
1448 Durgapur W/S Division Continuation order for the work of Providing functional household tap connection (FHTC) in connection with JAL JEEBAN MISSION(JIM) for Domra mouza (JL-68) under command area of Tilakchandrapur piped W/S Scheme at Kanksa Block under Durgapur W/S Division, PHE Dte ORD/000306/2021-2022 1663/DWSD 25/11/2021 10 AMARANJALI CONSTRUCTION 4.97 0.00 0
1449 Durgapur W/S Division Acceptance cum formal work order for the work of providing functional household tap connection (FHTC) in connection with JAL JEEBAN MISSION(JIM) for Kanksa (CT) mouza (JL-86) (Pt-B) under command area of Kanksa Zone-II (Ph-I) W/S Scheme at Kanksa Block under Durgapur W/S Division, PHE Dte (SL-03) ORD/000307/2020-2021 1433/DWSD 28/12/2020 60 SUJAY KUMAR RAY 42.78 39.52 0
1450 Durgapur W/S Division Continuation order for the work of Balance work for Providing functional household tap connection (FHTC) in connection with JAL JEEBAN MISSION(JIM) at Gopendanga mouza (JL-94) under command area of Jamgora-Jagannathpur piped W/s Scheme Durgapur-Faridpur Block under Durgapur W/S Division, PHE Dte. ORD/000307/2021-2022 1662/DWSD 25/11/2021 10 BADAL GHOSH 1.91 1.91 0
1451 Durgapur W/S Division Acceptance cum formal workorder for the work of Providing functional household tap connection (FHTC) in connection with JAL JEEBAN MISSION(JIM) for Kanksa (CT) mouza (JL-86) (Pt-F) under command area of Kanksa Zone-II (Ph-I) W/S Scheme at Kanksa Block under Durgapur W/S Division, PHE Dte (SL-05) ORD/000308/2020-2021 1434/DWSD 28/12/2020 45 TARA CONSTRUCTION 27.72 56.89 0
1452 Durgapur W/S Division Continuation order for the work of Providing functional household tap connection (FHTC) in connection with JAL JEEBAN MISSION(JIM) at Mahespur mouza (JL-12) under command area of Jamgora-Jagannathpur piped W/s Scheme Durgapur-Faridpur Block under Durgapur W/S Division, PHE Dte. ORD/000308/2021-2022 1746/DWSD 15/12/2021 10 BADAL GHOSH 3.96 3.96 0
1453 Durgapur W/S Division Acceptance cum formal work order for the work of Providing functional household tap connection (FHTC) in connection with JAL JEEBAN MISSION(JIM) for Kanksa (CT) mouza (JL-86) (Pt-C) under command area of Kanksa Zone-II (Ph-I) W/S Scheme at Kanksa Block under Durgapur W/S Division, PHE Dte ORD/000309/2020-2021 1435/DWSD 28/12/2020 60 ASHOK KUMAR GHOSH 42.78 38.48 0
1454 Durgapur W/S Division Formal for the work of Extension of pipe line from exisitng pipe line of Kanksa (Zone-II) (Ph-II) W/S scheme at Panagarh Bazar and east canal par in Kanksa block to providing FHTC at Kanksa mouza(JL-89) under DWSD PHE Dte ORD/000310/2021-2022 1773/DWSD 20/12/2021 30 M/S PIONEER CONSTRUCTION 13.23 13.02 0
1455 Durgapur W/S Division Acceptance cum formal work order for the work of providing functional household tap connection (FHTC) in connection with JAL JEEBAN MISSION(JIM) for Debipur mouza (JL-87) (Pt-B) under command area of Kanksa Zone-II (Ph-II) W/S Scheme at Kanksa Block under Durgapur W/S Division, PHE Dte (SL-08) ORD/000311/2020-2021 1437/DWSD 28/12/2020 60 M/S. D. PALIT & CO. 42.74 57.64 0
1456 Durgapur W/S Division Formal order for the work of Additional FHTC in connection with JJM for Prayagpur (CT) mouza (JL-88) under command area of Kanksa (Zone-II)(Ph-II) W/S Scheme at Kanksa block under DWSD PHE Dte . ORD/000312/2021-2022 1766/DWSD 16/12/2021 30 B. T. M. CONCERN 19.37 19.61 0
1457 Durgapur W/S Division Formal for the work of Emergency provision of AC phtovoltaic submersible solar pump set within bore well tube well along with 2400 peak watt capacity soalr photovoltaic array on Ms structure with sinking of 150 mm dia tube well 90 mtr deep by DR ring method using PVC pipe and fiber glass reinforced epoxy resin slotted to meet up water demand during summer season at Kalinagar under GP-Pratabpur Block-Durgapur-Faridpur under DWSD, PHE Dte ORD/000313/2021-2022 1776/DWSD 20/12/2021 30 M/S BADAL GHOSH 11.69 0.00 0
1458 Durgapur W/S Division Acceptance cum formal order for the work of supplying and Laying of Different dia UPVC pipe line With necessary allied works at Pandabeswar Block of RCFA Pt-III, Zone II B (From Mahal OHR) (Part - 12 A) Under Augmentation of RCFA Pt - III Zone - II W/S Scheme (JJM) under Durgapur Water Supply Division, PHE Dte. ORD/000313/2022-2023 1706/DWSD 09/12/2022 45 SUJAY KUMAR RAY 50.44 45.54 85
1459 Durgapur W/S Division Acceptance cum formal work order for the work of Providing functional household tap connection (FHTC) in connection with JAL JEEBAN MISSION(JIM) for Prayagpur mouza (JL-88) (Pt-B) under command area of Kanksa Zone-II (Ph-I) W/S Scheme at Kanksa Block under Durgapur W/S Division, PHE Dte ORD/000314/2020-2021 1439/DWSD 28/12/2020 25 DAS & CHAKRABORTY 7.24 7.33 0
1460 Durgapur W/S Division Formal order for the work of providing FHTC With necessary allied works at Pandabeswar Block of RCFA Pt-III, Zone II B (From Mahal OHR) (Part - 12 B) Under Augmentation of RCFA Pt - III Zone - II W/S Scheme (JJM) under Durgapur Water Supply Division, PHE Dte. ORD/000314/2022-2023 271/DWSD 16/02/2023 45 SHWET BARANI 32.57 14.80 100
1461 Durgapur W/S Division Acceptance cum formal work order for the work of Providing functional household tap connection (FHTC) in connection with JAL JEEBAN MISSION(JIM) for Satkahania mouza (JL-34) under command area of Basudha W/S Scheme at Kanksa Block under Durgapur W/S Division, PHE Dte (SL-12) ORD/000315/2020-2021 1440/DWSD 28/12/2020 25 SUBHADEEP DAS 8.66 15.20 0
1462 Durgapur W/S Division Acceptance cum formal order for the work of Supplying and Laying of Different dia UPVC pipe line With necessary allied works at Pandabeswar Block of RCFA Pt-III, Zone II B (From Mahal OHR) (Part - 13 A) Under Augmentation of RCFA Pt - III Zone - II W/S Scheme (JJM) under Durgapur Water Supply Division, PHE Dte. ORD/000315/2022-2023 1708/DWSD 09/12/2022 45 B.M. SARKAR 40.19 27.41 0
1463 Durgapur W/S Division Acceptance cum formal work order for the work of Providing functional household tap connection (FHTC) in connection with JAL JEEBAN MISSION(JIM) for Radhamohanpur mouza (JL-36) under command area of Basudha W/S Scheme at Kanksa Block under Durgapur W/S Division, PHE Dte ORD/000316/2020-2021 1441/DWSD 28/12/2020 25 MD AAMIR KHAN 13.53 27.39 0
1464 Durgapur W/S Division Acceptance cum Formal work-Order for the work of ---Providing functional household tap connection (FHTC) in connection with JAL JEEBAN MISSION(JIM) for Basudha mouza (JL-35) (Pt-B)under command area of Basudha W/S Scheme at Kanksa Block under Durgapur W/S Division, PHE Dte ORD/000317/2020-2021 1442/DWSD 28/12/2020 25 SAIKAT RAY 17.42 33.88 0
1465 Durgapur W/S Division Acceptance cum formal order for the work of Laying of additional distribution pipe line with necessary allied works at Jabber Pally ,Bansal Vadupara under retrofitting's of Gourbazar -Ichhapur piped W/S scheme under DWSD ,PHE Dte (Part-A)(SL-04) ORD/000317/2021-2022 1790/DWSD 23/12/2021 15 JOY GURU ENTERPRISE 5.00 5.00 0
1466 Durgapur W/S Division Acceptance cum Formal work-Order for the work of ---Providing functional household tap connection (FHTC) in connection with JAL JEEBAN MISSION(JIM) for Dubrajpur,Sashipur,Benodpur,Sundipur,Talbahari,Srirampur Mouzas (JL-9,8,6,4,3,1)under command area of Kanchanpur W/S Scheme at Kanksa Block under Durgapur W/S Division, PHE Dte ORD/000318/2020-2021 1443/DWSD 28/12/2020 30 MACHINO TECHNO 27.32 45.74 0
1467 Durgapur W/S Division Acceptance cum formal order for the work of Laying of additional distribution pipe line with necessary allied works at Bansal Kamala Park ,Majhipara and Bouri Para under retrofitting's of Gourbazar -Ichhapur piped W/S scheme under DWSD ,PHE Dte (Part-B)(SL-05) ORD/000318/2021-2022 1791/DWSD 23/12/2021 15 JOY GURU ENTERPRISE 4.93 4.92 0
1468 Durgapur W/S Division Acceptance cum Formal work-Order for the work of ---Providing functional household tap connection (FHTC) in connection with JAL JEEBAN MISSION(JJM) at Panagarh mouza (JL-85) (Part-B) under command area of Kanksa Zone-II(Ph-II) piped W/s Scheme of of Kanksa Block under Durgapur W/S Division, PHE Dte ORD/000319/2020-2021 1445/DWSD 28/12/2020 25 GITA CONSTRUCTION 17.07 27.86 0
1469 Durgapur W/S Division Acceptance cum formal order for the work of Laying of additional distribution pipe line with necessary allied works at Bansal Kamala Park, DMC area of Vivekananda Nagar under retrofitting's of Gourbazar -Ichhapur piped W/S scheme under DWSD ,PHE Dte (Part-C) (SL No-06) ORD/000319/2021-2022 1792/DWSD 23/12/2021 15 JOY GURU ENTERPRISE 4.96 4.93 0
1470 Durgapur W/S Division Acceptance cum formal order for the work of Laying of additional distribution pipe line with necessary allied works at Protapur mouza (JL-40) under Jamgora-Jagannathpur Piped W/s Scheme under DWSD,PHE Dte (SL-07) ORD/000320/2021-2022 1793/DWSD 23/12/2021 15 JAYANTA DATTA 4.56 4.54 0
1471 Durgapur W/S Division Acceptance cum Formal work-Order for the work of ---Providing functional household tap connection (FHTC) in connection with JAL JEEBAN MISSION(JIM) for Kanksa (CT) mouza (JL-86) (Pt-A) under command area of Kanksa Zone-II (Ph-I) W/S Scheme at Kanksa Block under Durgapur W/S Division, PHE Dte (SL-18) ORD/000321/2020-2021 1448/DWSD 28/12/2020 60 GITA CONSTRUCTION 42.61 76.74 0
1472 Durgapur W/S Division Formal order for the work of Providing FHTC With necessary allied works at Pandabeswar Block of RCFA Pt-III, Zone II B (From Mahal OHR) (Part - 13 B) Under Augmentation of RCFA Pt - III Zone - II W/S Scheme (JJM) under Durgapur Water Supply Division, PHE Dte. ORD/000321/2022-2023 29/DWSD 09/01/2023 45 PRAVAT SARKAR 28.70 16.11 0
1473 Durgapur W/S Division Acceptance cum formal order for the work of Extension of laying 75 mm dia HDPE pipe line at Prayagpur canal Par in Kanksa block to providing FHTC at Prayagpur mouza (JL-88) (Part-B) under DWSD ,PHE Dte (SL-09) ORD/000322/2021-2022 1795/DWSD 24/12/2021 15 CHATTERJEE CONSTRUCTION 3.26 3.33 0
1474 Durgapur W/S Division Acceptance cum formal order for the work of Supplying and Laying of Different dia UPVC pipe line With necessary allied works at Pandabeswar Block of RCFA Pt-III,Zone II B (From Mahal OHR) (Part - 14 A) Under Augmentation of RCFA Pt - III Zone - II W/S Scheme (JJM) under Durgapur Water Supply Division, PHE Dte. ORD/000322/2022-2023 1710/DWSD 09/12/2022 45 CHATTERJEE CONSTRUCTION 20.60 19.56 85
1475 Durgapur W/S Division Acceptance cum formal order for the work of Supplying and laying of laying 75 mm dia HDPE pipe line at Prayagpur canal per in Kanksa block to providing FHTC at Prayagpur mouza (JL-88) (Part-A) under DWSD ,PHE Dte (SL-10) ORD/000323/2021-2022 1796/DWSD 24/12/2021 15 CHATTERJEE CONSTRUCTION 4.98 5.01 0
1476 Durgapur W/S Division Acceptance cum formal order for the work of Providing FHTC With necessary allied works at Pandabeswar Block of RCFA Pt-III, Zone II B (From Mahal OHR) (Part - 14 B) Under Augmentation of RCFA Pt - III Zone - II W/S Scheme (JJM) under Durgapur Water Supply Division, PHE Dte. ORD/000323/2022-2023 1711/DWSD 09/12/2022 45 SAIKAT RAY 21.33 14.24 85
1477 Durgapur W/S Division Acceptance cum formal order for the work of Supplying and Laying of Different dia UPVC pipe line With necessary allied works at Pandabeswar Block of RCFA Pt-III, Zone II B (From Mahal OHR) (Part - 15 A) Under Augmentation of RCFA Pt - III Zone - II W/S Scheme under Durgapur Water Supply Division, PHE Dte. ORD/000324/2022-2023 1712/DWSD 09/12/2022 45 MAITO MAA ENTERPRISE 33.13 28.92 100
1478 Durgapur W/S Division Formal order for the work of Providing FHTC With necessary allied works at Pandabeswar Block of RCFA Pt-III, Zone II B (From Mahal OHR) (Part - 15 B) Under Augmentation of RCFA Pt - III, Zone - II W/S Scheme (JJM) under Durgapur Water Supply Division, PHE Dte. ORD/000325/2022-2023 73/DWSD 18/01/2023 45 SARKAR AGENCY 24.19 0.00 0
1479 Durgapur W/S Division Acceptance cum formal order for the work of Supplying and Laying of Different dia UPVC pipe line With necessary allied works at Pandabeswar Block of RCFA Pt-III,Zone II B (From Mahal OHR) (Part - 17 A) Under Augmentation of RCFA Pt - III Zone - II W/S Scheme (JJM) under Durgapur Water Supply Division, PHE Dte. ORD/000326/2022-2023 1714/DWSD 09/12/2022 45 M/S BADAL GHOSH 58.47 54.83 85
1480 Durgapur W/S Division Formal order for the work of sinking 1 No. 250 mm X 150 mm dia tube well 90 mtr deep by DR method using PVC pipe and fiber glass reinforced epoxy resin slotted at Krishnapur H/W site (OHR) under Krishnapur W/s Scheme under Durgapur W/s Division, PHE Dte ORD/000327/2020-2021 41/DWSD 13/01/2021 10 AMARANJALI CONSTRUCTION 7.02 0.00 0
1481 Durgapur W/S Division Acceptance cum formal order for the work of Supplying and Laying of Different dia UPVC pipe line With necessary allied works at Pandabeswar Block of RCFA Pt-III, Zone II B (From Mahal OHR) (Part - 16 A) Under Augmentation of RCFA Pt - III Zone - II W/S Scheme (JJM) under Durgapur Water Supply Division, PHE Dte. ORD/000327/2022-2023 1715/DWSD 09/12/2022 45 M/S MONDAL ENTERPRISE 29.30 28.85 100
1482 Durgapur W/S Division Acceptance cum formal order for the work of Additional distribution pipe line with necessary allied works for FHTC purpose at Jagannathpur gram,Jagganathpur Dangal para to Kailashpur upper para ,Kalinagar main road to upper para ,Gopendanga main road to Bagdi para under Improvement of Jamgora-Jagannathpur Piped W/s Scheme under DWSD,PHE Dte ORD/000328/2021-2022 1802/DWSD 27/12/2021 20 M/S BADAL GHOSH 3.99 3.99 0
1483 Durgapur W/S Division Acceptance cum formal order for the work of 2 Nos trial bore by direct rotary method drilling using rig machine at Roopganj H/W Site ,Tube well No-I &II of Augmentation of Roopganj piped W/s Scheme under DWSD ,PHE Dte(SL-16) ORD/000329/2021-2022 1803/DWSD 28/12/2021 10 M/S KALYANI ENTERPRISE 2.32 1.16 0
1484 Durgapur W/S Division Acceptance cum formal order for the work of Construction of Pump house cum chlorine room and switch room at Bistupur Head work sites (Tube well no ¿I) under Bistupur piped W/S scheme under DWSD,PHE Dte (SL-18) ORD/000331/2021-2022 1805/DWSD 28/12/2021 45 BABA LOKENATH ENTERPRISE 4.87 4.20 0
1485 Durgapur W/S Division Acceptance cum formal order for the work of Construction of Pump house cum chlorine room and switch room at Molandighi (Tube well no ¿II) sites under Bistupur piped W/S scheme under DWSD,PHE Dte ORD/000332/2021-2022 1808/DWSD 29/12/2021 45 CHATTERJEE CONSTRUCTION 4.67 3.59 0
1486 Durgapur W/S Division Formal order for the work of Providing FHTC With necessary allied works at Pandabeswar Block of RCFA Pt-III, Zone II B (From Mahal OHR) (Part - 16 B) Under Augmentation of RCFA Pt - III Zone - II W/S Scheme (JJM) under Durgapur Water Supply Division, PHE Dte. ORD/000332/2022-2023 28/DWSD 09/01/2023 45 M/S MONDAL ENTERPRISE 23.80 21.49 90
1487 Durgapur W/S Division Formal order for the work of Providing FHTC With necessary allied works at Pandabeswar Block of RCFA Pt-III, Zone II B (From Mahal OHR) (Part - 17 B) Under Augmentation of RCFA Pt - III Zone - II W/S Scheme (JJM) under Durgapur Water Supply Division, PHE Dte. ORD/000333/2022-2023 27/DWSD 09/01/2023 45 M/S BADAL GHOSH 38.49 18.77 0
1488 Durgapur W/S Division Acceptance cum formal order for the work of Construction of Pump house cum chlorine room and switch room at Molandighi (Tube well no ¿III) sites under Bistupur piped W/S scheme under DWSD,PHE Dte (SL-21) ORD/000334/2021-2022 1810/DWSD 29/12/2021 45 DARPAN DAS & CO. 4.67 3.59 0
1489 Durgapur W/S Division Acceptance order for the work of Supply ,Installation and fabrication of 5 Nos 50 cum./Hr capacity pressure type Iron Elimination Plant which consist of one filter chamber ( dia- 3 m,height -1.5 mtr ) and one oxidation chamber ( dia -1.00 m height -1.2 m) each and Construction of Blower Room (6.50m X 4.00m) With I.E.P. Platform, Plinth, Roof Top Treatment, Plinth Protection and Side Drain at Ramnagar H/W site under Augmentation 0f RCFA, Pt- III (Zone- II) W/S Scheme (JJM) under D.W.S.D., P.H.E. Dte. ORD/000334/2022-2023 1718/DWSD 09/12/2022 45 ALOK ENTERPRISE 86.64 85.97 100
1490 Durgapur W/S Division Acceptance cum formal order for the work details route survey, drawing design of distribution network & preparation of estimates and DPR in connection with the JJM (FHTC) of Augmentation of Roopganj Piped W/s Scheme under, DWSD, PHE Dte.(SL-01) ORD/000335/2021-2022 1684/DWSD 02/12/2021 30 M/S R.DUTTA AND CO. 6.39 6.39 0
1491 Durgapur W/S Division Acceptance cum formal order for the work of Details route survey, drawing design of distribution network & preparation of estimates and DPR in connection with the JJM (FHTC) of Augmentation of Gopalpur piped W/S Scheme DWSD, PHE Dte.(SL-02) ORD/000336/2021-2022 1685/DWSD 02/12/2021 30 M/S R.DUTTA AND CO. 8.48 8.48 0
1492 Durgapur W/S Division Continuation order for the work of the work of Providing functional house hold tap connection (FHTC ) in connection with JJM for Huchuk Danga Jamgora-Jagannathpur piped W/S Scheme Mouza-Dannaya /Jamgora(JL-23) block-Durgapur-Faridpur ,Paschim Bardhaman under DWSD,PHE Dte ORD/000337/2021-2022 25/DWSD 06/01/2022 15 RANJIB GHATAK 3.49 3.51 0
1493 Durgapur W/S Division Formal order for the work of Supplying ,laying and aligning of HDPE/DI distribution pipe line and allied works including functinal household tap connection (FHTC) and connection provided to ICDS ,Health Centre ,Govt Bioldings school under the command area of Gopalpur mouza of Augmentation of Gopalpur piped W/s Scheme under Durgapur W/S Division, PHE Dte. ORD/000341/2021-2022 68/DWSD 19/01/2022 180 MRITYUNJOY MUKHERJEE AND CO 494.51 304.99 100
1494 Durgapur W/S Division Acceptance cum formal order for the work of Supplying, laying & aligning of UPVC distribution pipe line (Distribution system Part-A) and allied works including functional house holds tap connection (FHTC) and connection providing to Akandara(JL No-47) ,Molandighi(JL No-48),Kandarakona (JL_51),Rakhitpur(JL-42,Chua(JL-43),Bhagaabanpur(JL-45),Hariki(JL No-50) Mouzas under command area of Aug of Bistupur piped W/s Scheme under DWSD,PHE Dte ORD/000342/2021-2022 81/DWSD 25/01/2022 65 MACHINO TECHNO 377.99 0.00 0
1495 Durgapur W/S Division Formal order for the work of Supplying laying of 90 mm dia UPVC pipe bypass connection for Amlouka gram from Banguri more of Improvement of Jamgora-Jagannathpur W/s Scheme under DWSD ,PHE Dte (SL-02) ORD/000346/2021-2022 135/DWSD 02/02/2022 15 MD JAWED KHAN 6.60 0.00 50
1496 Durgapur W/S Division Formal order for the work of Extension of pipe line from the existing pipe line from command area of Gourbazar-Ichhapur piped W/s Scheme of Ichhapur area for providing of FHTC at Ichhapur mouza(JL-50) under DWSD,PHE Dte (SL-05) ORD/000347/2021-2022 140/DWSD 03/02/2022 7 SHWET BARANI 13.62 13.60 0
1497 Durgapur W/S Division Formal order for the work of Additional work for providing FHTC in connection with JJM for Kanksa mouzza (JL-89) under command area of Kanksa (Zone-II) Ph-II W/s Scheme at Kanksa block under DWSD ,PHE Dte (SL-03) ORD/000348/2021-2022 199/DWSD 16/02/2022 15 GITA CONSTRUCTION 9.72 9.01 0
1498 Durgapur W/S Division Acceptance cum formal work order for the work of Withdrawing existing damaged 150 mm dia AC pipe line and laying 160 mm dia (OD) HDPE pipe in the same trench from Madhaiganj OHR site towards Rangamati village under RCFA Pt-III W/S Scheme under DWSD, PHE Dte (SL-24) ORD/000350/2020-2021 69/DWSD 13/01/2021 15 KARMAKAR CONSTRUCTION 2.31 2.31 0
1499 Durgapur W/S Division Fomal order for the work of Supplying laying and alinging of UPVC distribution pipe line (distribution system Part-B) and allied works including FHTC and connecrtion provided to Kuldiha,Pathardihi,Keshabpur moluzas under command area of Bistupur piped W/s Scheme under Durgapur W/s Division, PHE Dte ORD/000353/2021-2022 148/DWSD 07/02/2022 30 TARA CONSTRUCTION 147.47 139.68 0
1500 Durgapur W/S Division Acceptance cum formal order for the work of Additional pipe line work with concrete cutting at Shilampur mouza for providing FHTC in connection with Jal Jeevan mission for Shilampur Mouza(JL-90) under command area of Kanksa (Zone-I) W/s Scheme at Kanksa block under DWSD, PHE Dte (SL-18) ORD/000354/2020-2021 72/DWSD 13/01/2021 25 MAK CONSTRUCTION CO. 4.98 10.04 0
1501 Durgapur W/S Division Formal order for the work of Supplying, laying & aligning of UPVC distribution pipe line (Distribution system Part-A) and allied works including functional house holds tap connection (FHTC) and connection providing to Akandara(JL No-47) ,Molandighi(JL No-48),Kandarakona (JL_51),Rakhitpur(JL-42,Chua(JL-43),Bhagaabanpur(JL-45),Hariki(JL No-50) Mouzas under command area of Bistupur piped W/s Scheme under DWSD,PHE Dte (SL-01) ORD/000354/2021-2022 149/DWSD 07/02/2022 65 MACHINO TECHNO 377.24 365.87 100
1502 Durgapur W/S Division Formal order for the work of Supplying, laying and aligning of UPVC distribution pipe line (Distribution system( Part-B) and allied works including functional house holds tap connection (FHTC) and connection providing to Saraswatiganj (JL No-49) ,Bistupur (JL No-44) Mouzas under command area of Bistupur piped W/s Scheme under DWSD,PHE Dte (SL-03) ORD/000355/2021-2022 150/DWSD 07/02/2022 30 SK. ALIM 188.51 186.94 0
1503 Durgapur W/S Division Acceptance cum formal order for the work of Laying of 90 mm dia HDPE pipe line and withdrawing of 90 mm dia UPVC and laying the same in opposite flank of road with necessary allied works at Anandapur mouza,ICDS to Dompara under Kanksa (Z-I) W/s Scheme ,Block -Kanksa for cambat of upcoming drought unde DWSD , PHE Dte . (SL-01) ORD/000356/2021-2022 73/DWSD 21/01/2022 10 RANJIB GHATAK 1.78 1.79 0
1504 Durgapur W/S Division Acceptance cum formal order for the work of Laying of additional distribution pipe line with necessary allied works at Matwangini more to Bhabandapur village road of Gourbazar-Ichhapur piped W/S Scheme under DWSD,PHE Dte ORD/000357/2021-2022 74/DWSD 21/01/2022 20 R.K.ENTERPRISE 4.99 0.00 0
1505 Durgapur W/S Division Acceptance cum formal order for the work of Laying of CI Pipe line ,sluice valves ,UPVC pipe line and allied works at Madhaiganj H/W Site under Modified RCFA Part-III W/s Scheme under DWSD, PHE Dte (SL-03) ORD/000358/2021-2022 75/DWSD 21/01/2022 15 KARMAKAR CONSTRUCTION 2.57 2.50 0
1506 Durgapur W/S Division Acceptance cum formal order for the work of Dismantling and reconcreting of PCC road for extension of pipe line from existing pipe line of Kanksa (Z-II)(Ph-II) W/s Scheme to laying branch pipe line in kanksa block for providing FHTC at PanagarhJL_85) at Palpara ,Hazra Para ,Kumanrpara near TC pur Panchayat ,Panagarh bypass under DWSD PHE Dte (Sl-04) ORD/000359/2021-2022 78/DWSD 24/01/2022 15 GITA CONSTRUCTION 3.46 3.39 0
1507 Durgapur W/S Division Acceptance cum formal order for the work of Laying of collection main necessary repairing works in river Ajoy at Bhaburia H/W site under Jamgora -Jagannathpur piped W/s Scheme and Gourbazar-Ichhapur piped W/s Scheme.(Part-A) ORD/000360/2021-2022 79/DWSD 24/01/2022 15 RANAJOY ENTERPRISE 3.85 0.00 0
1508 Durgapur W/S Division Acceptance cum formal order for the work of Supplying fitting fixing of PCC precast pillar and fencing with barbed wire errection of Govt sign board 03 nos place for protection of vest land at Molandighi of Bistupur W/s Scheme of 03 Nos at Gopalpur of Augmentation of Gopal pur piped W/s Scheme ORD/000362/2021-2022 84/DWSD 25/01/2022 15 MD JAWED KHAN 2.33 2.33 0
1509 Durgapur W/S Division Acceptance cum formal order for the work of modernization of the existing Gopalpur Lab for NABL accreditation of Sub-district water testing lab at Kanksa of Jamgora-Jagannathpur piped W/s Scheme under DWSD, PHE Dte ORD/000363/2021-2022 87/DWSD 27/01/2022 15 BASANTI TRADERS 4.39 4.12 100
1510 Durgapur W/S Division Acceptance cum formal order for the work of Laying of distribution pipe line with necessary allied works for FHTC purpose at Maheshpur village Muchipara,Chasa para Moheshpur Mouza(JL-12),Durgapur-Faridpur block under DWSD PHE Dte ORD/000364/2021-2022 88/DWSD 27/01/2022 15 M/S BADAL GHOSH 4.87 4.92 0
1511 Durgapur W/S Division Acceptance cum formal order for the work of repairing of existing distribution pipe line with 110 mm UPVC line and necessary allied works at Nakrakonda village under RCFA Pt-III W/s Scheme under DWSD, PHE Dte (SL-12) ORD/000367/2021-2022 98/DWSD 28/01/2022 15 RANAJOY ENTERPRISE 1.25 0.00 0
1512 Durgapur W/S Division Acceptance cum formal order for the work of Electric wiring and other allied works for modernization of the existing Gopalpur lab for NABL accreditation of Sub-District Water test ing lab at Kanksa of Jamgora-Jagannathpur piped W/s Scheme under DWSD ,PHE Dte ORD/000368/2021-2022 100/DWSD 31/01/2022 15 BASANTI TRADERS 1.65 1.57 0
1513 Durgapur W/S Division Acceptance cum formal order for the work of Surging of 5 Nos tube well including withdrawing pumping machinery setting the same correcting cable line and other allied works due to flood damaged at Bhaburia H/W site under Jamgora-Jagannathpur & Gourbazar-Ichhapur piped W/s Scheme.(Part-B) ORD/000369/2021-2022 101/DWSD 31/01/2022 20 RANAJOY ENTERPRISE 1.80 0.00 50
1514 Durgapur W/S Division Acceptance cum formal order for the work of rising main & distribution system of Gopalpur Piped W/s Scheme under DWSD, PHE Dte ORD/000370/2021-2022 65/DWSD 19/01/2022 30 EXECUTIVE ENGINEER , RESOURCES DIVISION, PHE DTE. 34.25 34.28 0
1515 Durgapur W/S Division Acceptance cum formal order for the work of rising main & distribution system of Gopalpur Piped W/s Scheme under DWSD, PHE Dte ORD/000371/2021-2022 66/DWSD 19/01/2022 15 EXECUTIVE ENGINEER , RESOURCES DIVISION, PHE DTE. 8.89 80.89 0
1516 Durgapur W/S Division Acceptance cum formal order for the work of Providing functional household tap connection (FHTC) in connection with JAL JEEBAN MISSION(JIM) for Arrah mouza (JL-91) (Pt-A) under command area of Rupganj W/S Scheme at Kanksa Block under Durgapur W/S Division, PHE Dte ORD/000372/2020-2021 144/DWSD 28/01/2021 45 M/S KALYANI ENTERPRISE 28.83 28.84 0
1517 Durgapur W/S Division Formal order for the work of Augmentation at Natundanga of RCFA Part-III (Zone--I/A) piped W/s Scheme including laying distribution network (LDS) and functinal household tap connection (FHTC) under Durgapur W/s Division, PHE Dte ,Block-Durgapur-Faridpur ,Dist-Paschim Bardhaman (SL-02) ORD/000372/2022-2023 1778/DWSD 23/12/2022 739 ALOK ENTERPRISE 634.56 448.32 75
1518 Durgapur W/S Division Acceptance cum formal order for the work of Providing functional household tap connection (FHTC) in connection with JAL JEEBAN MISSION(JIM) for Arrah mouza (JL-91) (Pt-B) under command area of Roopganj W/S Scheme at Kanksa Block under Durgapur W/S Division, PHE Dte ORD/000373/2020-2021 145/DWSD 28/01/2021 50 M/S KALYANI ENTERPRISE 36.43 32.48 0
1519 Durgapur W/S Division Formal order for the work of Augmentation of RCFA Part-III )Zone-I/Part-B) piped W/s Scheme by construction of 250 M3 RCC OHR of 20 mtr staging height with necessary interconnection soil investigation including laying distribution network and Functional House Tap Connection (FHTC) under DWSD,PHE Dte ,Block-Durgapur-Faridpur,Dist-Paschim Bardhhaman (Sl-01 ORD/000373/2022-2023 1779/DWSD 23/12/2022 12 UMWELT ENGINEER PVT LTD 919.36 917.39 90
1520 Durgapur W/S Division Acceptance cum formal order for the work of Emergency repairing restoration and chokage cleaning of distribution system of Hetedoba OHR from Hetedoba OHR to Sarpi more of Gourbazar-Ichhapur piped W.S Scheme under DWSD,PHE Dte ORD/000374/2021-2022 112/DWSD 01/02/2022 20 PAYAL CONSTRUCTION 3.24 0.00 0
1521 Durgapur W/S Division Acceptance cum formal order for the work of Providing functional household tap connection (FHTC) in connection with JAL JEEBAN MISSION(JIM) for Shyamsundarpur mouza (JL-07) (Pt-B) under command area of Gourbazar-Ichhapur W/s Scheme of Durgapur-Faridpur Block under Durgapur W/S Division, PHE Dte .(SL-02) ORD/000379/2020-2021 171/DWSD 03/02/2021 25 PRAVAT SARKAR 37.43 63.50 0
1522 Durgapur W/S Division Formal order for the work of augmentation at Madhaiganj of RCFA Part-III (Zone-I/C) piped W/s Scheme including laying distribution network and functional household tap connection (FHTC) under Durgapur W/S Division, PHE Dte Block-Durgapur-Faridpur ,Dist.-Paschim Bardhhaman. ORD/000380/2022-2023 05/DWSD 02/01/2023 120 IJABUL SEKH 279.99 236.03 100
1523 Durgapur W/S Division Acceptance cum formal order for the work of Providing water supply to Birudiha High school under Kanksa block covered by Kanksa (Zone-II) having electricity but uncovered by PWSS under DWSD, PHE Dte (SL-26) ORD/000382/2021-2022 120/DWSD 01/02/2022 20 BASANTI TRADERS 2.11 2.06 0
1524 Durgapur W/S Division Formal order for the work of Supplying, laying and aligning of HDPE distribution pipe line and allied works at Rail par Sarada Pally of Prayagpur Mouza under command area of Augmentation of Kanksa (Zone-II/D) W/S Scheme under DWSD ,PHE Dte (Part-C)(SL-01) ORD/000388/2021-2022 185/DWSD 11/02/2022 30 MD AAMIR KHAN 80.93 80.83 0
1525 Durgapur W/S Division Formal order for the work of Supplying ,laying and aligning of HDPE distribution pipe line and allied works at Railpar Saradapally Mouza under command area of Augmentation of Kanksa (Zone-II/D) under DWSD ,PHE Dte (Part-D) (SL-02) ORD/000389/2021-2022 187/DWSD 15/02/2022 30 SAIKAT RAY 85.77 87.48 0
1526 Durgapur W/S Division Acceptance cum formal order for the work Providing FHTC in connection with JJM at Shayamsundarpur mouza(JL-07) ,Block-Durgapur-Fardipur Block ,Dist-Paschim Bardhman under Gourbazar-Ichhapur piped W/s Scheme PHE Dte (P-C) ORD/000390/2021-2022 10/DWSD 04/01/2022 15 PRAVAT SARKAR 4.84 4.84 0
1527 Durgapur W/S Division Acceptance cum formal order for the work of Construction of boundary wall at Kanksa (Zone-II & Ph-I W/s Scheme pump house No-II at Ijjatganj under DWSD ,PHE Dte (SL-04) ORD/000392/2020-2021 186/DWSD 04/02/2021 45 M/S BADAL GHOSH 4.92 4.68 0
1528 Durgapur W/S Division Formal order for the work of Supplying ,laying and aligning of HDPE distribution pipe line and allied works at Railpar Saradapally Mouza under command area of Augmentation of Kanksa (Zone-II/D) under DWSD ,PHE Dte (Part-B) ORD/000393/2021-2022 201/DWSD 17/02/2022 30 AMARANJALI CONSTRUCTION 94.15 75.19 0
1529 Durgapur W/S Division Formal order for the work Supplying ,laying and aligning of HDPE distribution pipe line and allied works at Railpar Saradapally Mouza under command area of Augmentation of Kanksa (Zone-II/D) under DWSD ,PHE Dte (Part-A) ORD/000394/2021-2022 184/DWSD 11/02/2022 30 M/S S. CHOUDHURY 96.45 55.16 100
1530 Durgapur W/S Division Formal order for the work of Supplying& laying of different dia HDPE pipe line with necessary allied works at Anandapur Mouza(JL-89),Block -Kanksa under Augmentation of Kanksa (Zone-I W/s Scheme under DWSD ,PHE Dte ORD/000395/2021-2022 197/DWSD 16/02/2022 30 AMAR CONSTRUCTION 27.51 15.36 0
1531 Durgapur W/S Division Formal order for the work of Sinking of 1No(300X200 mm) dia tube well 150 mtr deep by direct rotary method using PVC pipe and fibber glass reinforced epoxy resin slotted at Tube well No-03 site at Anandapur under Kanksa block (Zone-I) for Augmentation of ground water base Kanksa (Zone-I) piped W/s Scheme under DWSD ,PHE Dte ORD/000396/2021-2022 196/DWSD 16/02/2022 30 RANJIB GHATAK 10.43 10.22 0
1532 Durgapur W/S Division Formal order for the work of Sinking of 1No(300X200 mm) dia tube well 210 mtr deep by direct rotary method using PVC pipe and fibber glass reinforced epoxy resin slotted at Tube well No-01 site at Railpar Saradapally near DVC branch canal for Augmentation of ground water base Kanksa (Zone-II/D) piped W/s Scheme under DWSD ,PHE Dte. ORD/000397/2021-2022 202/DWSD 17/02/2022 30 JOY GURU ENTERPRISE 10.30 10.26 0
1533 Durgapur W/S Division Formal order for the work of Sinking of 1No(300X200 mm) dia tube well 210 mtr deep by direct rotary method using PVC pipe and fibber glass reinforced epoxy resin slotted at Tube well No-02 site at Railpar Saradapally near DVC branch canal for Augmentation of ground water base Kanksa (Zone-II/D) piped W/s Scheme under DWSD ,PHE Dte. ORD/000398/2021-2022 198/DWSD 16/02/2022 30 RANJIB GHATAK 10.30 10.26 0
1534 Durgapur W/S Division Formal order for the work Sinking of 1No(300X200 mm) dia tube well 210 mtr deep by direct rotary method using PVC pipe and fibber glass reinforced epoxy resin slotted at Tube well No-03 site at Railpar Saradapally near DVC branch canal for Augmentation of ground water base Kanksa (Zone-II/D) piped W/s Scheme under DWSD ,PHE Dte. ORD/000399/2021-2022 188/DWSD 15/02/2022 30 AHS R INFRA PRIVATE LIMITED 10.30 10.26 0
1535 Durgapur W/S Division Acceptance cum formal order for the work of Construction of pump house cum chlorine room at Railpar Sarada Pally H/W site pump house No-1 tube well No-01(OHR) for Augmentation of Kanksa (Zone-II/D) pipe W/s Scheme under DWSD ,PHE Dte (SL-01) ORD/000400/2021-2022 240/DWSD 25/02/2022 45 GHOSH & ROY ENTERPRISE 4.89 4.76 100
1536 Durgapur W/S Division Acceptance cum formal order for the work of Construction of pump house cum chlorine room at Railpar Sarada Pally H/W site pump house No-2 tube well No-02 for Augmentation of Kanksa (Zone-II/D) pipe W/s Scheme under DWSD ,PHE Dte (SL-02) ORD/000401/2021-2022 241/DWSD 25/02/2022 45 MUKHERJEE ENTERPRISE 4.89 4.76 100
1537 Durgapur W/S Division Acceptance cum formal order for the work of Construction of pump house cum chlorine room at Railpar Sarada Pally H/W site pump house No-3 tube well No-03(for Augmentation of Kanksa (Zone-II/D) pipe W/s Scheme under DWSD ,PHE Dte (SL-03) ORD/000402/2021-2022 242/DWSD 25/02/2022 45 CHATTERJEE CONSTRUCTION 4.89 3.76 0
1538 Durgapur W/S Division Acceptance cum formal order for the work of Construction of pump house cum chlorine room at AnandaPur H/W site of ground water base Kanksa(Zone-I) pipe W/s Scheme under DWSD ,PHE Dte (SL-04) ORD/000403/2021-2022 241/A/DWSD 25/02/2022 45 CHANDAN HAZRA 4.99 4.89 0
1539 Durgapur W/S Division Formal order for the work of Replacement of damaged AC pipe with 90 mm dia HDPE from Roopganj more to Araichand gram of Augmentation of Roopganj Piped W/s Scheme under DWSD ,PHE Dte(SL-01) ORD/000407/2021-2022 334/DWSD 15/03/2022 15 M/S KALYANI ENTERPRISE 10.23 10.25 0
1540 Durgapur W/S Division Formal order for the work of Supplying and laying of 90/75 mm dia HDPE pipe and 63/50 mm dia UPVC pipe line with necessary allied work at Sundiara and Tilakchnadrapur mouza JL-63/67) under Augmentation of Kanksa (Zone-II/Part-A) piped W/s Schme for providing FHTC under DWSD ,PHE Dte (SL-02) ORD/000408/2021-2022 312/DWSD 11/03/2022 15 SK. ABDUL HALIM 9.12 9.11 0
1541 Durgapur W/S Division Formal order for the work of Additional work for providing FHTC tap connection with jjm at Ijjatganj mouza(JL-71) and laying 125 mm dia HDPE and 63/50 mm dia UPVC pipe under command area of Augmentation of Kanksa (Zone-II/Part-A) piped W/s Schme for providing FHTC under DWSD ,PHE Dte ORD/000409/2021-2022 333/DWSD 15/03/2022 15 RANJIB GHATAK 29.48 29.65 0
1542 Durgapur W/S Division Continuation for the work of balance work for providing functional household tap connection (FHTC) in connection with JJM at Jagannathpur mouza (JL-26) under command area of Jamgora -Jagannathpur piped W/s Scheme under Durgapur-Faridpur block of DWSD,PHE Dte ORD/000412/2021-2022 244/DWSD 22/02/2022 25 M/S BADAL GHOSH 2.09 1.99 0
1543 Durgapur W/S Division Continuation for the work of providing functional household tap connection (FHTC) in connection with JJM at Srikrishnapur mouza (JL No-09),Baidayanathpur and Kailashpur(JL No-09/20/22) under Retrofitting of Gourbazar-Ichhapur piped W/s Scheme under DWSD,PHE Dte. ORD/000415/2021-2022 266/DWSD 04/03/2022 15 JOY GURU ENTERPRISE 3.60 3.58 0
1544 Durgapur W/S Division Acceptance cum formal order for the work of Extension of pipe line from existing pipe line of Kanksa zone -II Ph-I W/s Scheme to combat draught like situation at in Kaksa Block to providing FHTC at Ijjatganj Mouza (JL-79) under DWSD,PHE Dte..(SL-04) ORD/000417/2020-2021 273/DWSD 26/02/2021 25 RANJIB GHATAK 4.97 0.00 0
1545 Durgapur W/S Division Formal order for the work of Supplying laying and aligning of HDPE distribution pipe line and Other allied works under command area of ARRAH Mouza (Part-C) under Augmentation of Roopganj piped W/s Scheme under DWSD,PHE Dte (SL-03) ORD/000418/2021-2022 402/DWSD 29/03/2022 25 M/S KALYANI ENTERPRISE 26.32 27.01 0
1546 Durgapur W/S Division Formal order for the work of Construction of 350 M3 capacity Over Head Reservoir having 20 Mtr staging height of RCC OHR at Roopganj H/W site under Augmentation of Roopganj piped W/s Scheme under DWSD,PHE Dte (SL-05) ORD/000419/2021-2022 416/A/DWSD 30/03/2022 180 AMARANJALI CONSTRUCTION 83.60 47.35 75
1547 Durgapur W/S Division Formal order for the work of Supplying laying and aligning of HDPE distribution pipe line and Other allied works under command area of ARRAH Mouza (Part-A) under Augmentation of Roopganj piped W/s Scheme under DWSD,PHE Dte (SL-01) ORD/000420/2021-2022 404/DWSD 29/03/2022 25 DARPAN DAS & CO. 63.18 49.67 0
1548 Durgapur W/S Division Formal order for the work of Supplying laying and aligning of HDPE distribution pipe line and Other allied works under command area of ARRAH Mouza (Part-D) under Augmentation of Roopganj piped W/s Scheme under DWSD,PHE Dte (SL-04) ORD/000421/2021-2022 397/DWSD 28/03/2022 30 M/S BADAL GHOSH 74.20 71.00 0
1549 Durgapur W/S Division Formal order for the work of Supplying laying and aligning of HDPE distribution pipe line and Other allied works under command area of ARRAH Mouza (Part-B) under Augmentation of Roopganj piped W/s Scheme under DWSD,PHE Dte (SL-02) ORD/000422/2021-2022 401/DWSD 29/03/2022 30 M/S KALYANI ENTERPRISE 92.48 87.50 0
1550 Durgapur W/S Division Continuation order for the work of Providing functional house hold tap connection in connection with JJM at Shyamsundarpur Mouza(JL-07) ,block-Durgapur-Faridpur ,Dist-Paschim Bardhaman under Gourbazar-Ichhapur piped W/s Scheme under DWSD,PHE Dte. ORD/000424/2021-2022 245/DWSD 28/02/2022 15 PRAVAT SARKAR 4.97 0.00 50
1551 Durgapur W/S Division Continuation order for the work of Providing functional house hold tap connection in connection with JJM at Shyamsundarpur Mouza(JL-07) ,block-Durgapur-Faridpur ,Dist-Paschim Bardhaman under Gourbazar-Ichhapur piped W/s Scheme under DWSD,PHE Dte. ORD/000425/2021-2022 239/DWSD 25/02/2022 15 PRAVAT SARKAR 4.92 4.39 0
1552 Durgapur W/S Division Continuation for the work of Providing functional house hold tap connection (FHTC) in connection with JJM for Domra mouza-68 under command area of Trilakchandrapur piped W/s Scheme at Kanksa Block under DWSD, PHE Dte ORD/000426/2021-2022 347/DWSD 17/03/2022 1110 AMARANJALI CONSTRUCTION 3.03 0.00 100
1553 Durgapur W/S Division Acceptance cum formal order for the work of Construction of Guard wall at Madhabmat pukur par of Kanksa (Zone-II) piped W/s Scheme under DWSD, PHE Dte (SL-01) ORD/000428/2021-2022 405/DWSD 30/03/2022 10 TARA CONSTRUCTION 4.38 2.71 100
1554 Durgapur W/S Division Acceptance cum formal order for the work of Replacement of pipe line from existing pipe line of Kanksa (Zone-II) W/s Scheme at Madhabmat and near under bypass in Kanksa Block under DWSD, PHE Dte (Sl-4) ORD/000431/2021-2022 411/DWSD 30/03/2022 7 SWATI CORPORATION 3.13 3.14 0
1555 Durgapur W/S Division Acceptance cum formal order for the work of Emergency repairing restoration of distribution system of Nachan OHR (Part-B) from Nachan More to Dhaboni Lobnapara under Jamgora-Jagannathpur piped W/s Scheme under DWSD ,PHE Dte.(SL-05) ORD/000432/2021-2022 412/DWSD 30/03/2022 15 PAYAL CONSTRUCTION 4.63 1.64 0
1556 Durgapur W/S Division Acceptance cum formal order for the work of Emergent supply fitting fixing of Sluice Valve for repairing and maintenance of pipe line under Kanksa (Zone-II) W/S Scheme under DWSD ,PHE Dte.(SL-06) ORD/000433/2021-2022 413/DWSD 30/03/2022 10 SWATI CORPORATION 2.00 1.94 0
1557 Durgapur W/S Division Acceptance cum formal order for the work of Hiring of LUXURY Diesel Ambassador Car including higher model 2012 onwards of Diesel Ambassador or equivalent for official use (Inspection Vehicle for site vigit against JJM related scheme) for the office of the Executive Engineer ,Durgapur Water Supply Division, Public Health Engineering (w.e.f 01.01.2023 to 30.06.2023).(Sl-01) ORD/000438/2022-2023 1801/DWSD 30/12/2022 182 PRAMIT CHATTERJEE 0.82 2.39 0
1558 Durgapur W/S Division Formal order for the work of Laying and aligning of distribution pipe line from Hetedoba OHR,DI Specials ,Valves and allied works under Augmentation of Roopganj piped W/s Scheme under DWSD ,PHE Dte. ORD/000439/2022-2023 299/DWSD 20/02/2023 20 BABA LOKENATH ENTERPRISE 16.32 16.06 0
1559 Durgapur W/S Division Formal order for the work Laying and aligning of distribution pipe line from Bonsol to towards Jhajra Majipara and allied works under Augmentation of Gopalpur piped W/s Scheme under DWSD ,PHE Dte. ORD/000440/2022-2023 300/DWSD 20/02/2023 15 BABA LOKENATH ENTERPRISE 6.27 6.27 0
1560 Durgapur W/S Division Acceptance cum formal order for the work of Repairing of leakage bursting and chokage cleaning at Arrah Distribution main and other allied work for Roopganj piped W/s Scheme all command area of Roopganj W/s Scheme under DWSD, PHE Dte.(SL-05) ORD/000441/2021-2022 420/DWSD 30/03/2022 15 M/S KALYANI ENTERPRISE 4.10 4.09 100
1561 Durgapur W/S Division Acceptance order for the work of Laying and aligning of distribution pipe line from zero point and allied works under Augmentation of Kanksa Zone-II/Part-A) piped W/s Scheme under DWSD ,PHE Dte. ORD/000441/2022-2023 104/DWSD 24/01/2023 20 PAYAL CONSTRUCTION 8.60 8.59 0
1562 Durgapur W/S Division Acceptance cum formal order for the work of Making interconnection of Over flow line and laying of additonal distribution pipe line with necessary allied works for FHTC purpose at Jagnnathpur gram under Jamgora-Jagannathpur W/S Scheme under DWSD PHE Dte (SL-06) ORD/000442/2021-2022 421/DWSD 30/03/2022 10 M/S BADAL GHOSH 3.69 3.68 0
1563 Durgapur W/S Division Acceptance cum formal order for the work of laying of distribution pipe line with necessary allied work at Domra and Piariganj mouza under Tilakchandrapur W/s Scheme for FHTC under DWSD, PHE Dte. ORD/000443/2021-2022 422/DWSD 30/03/2022 10 AMARANJALI CONSTRUCTION 4.74 4.73 0
1564 Durgapur W/S Division Formal order for the work of Laying and aligning of distribution pipe line from zero point to Jhanjra more and allied works under Augmentation of Kanksa Zone-II/Part-B) piped W/s Scheme under DWSD ,PHE Dte. ORD/000443/2022-2023 302/DWSD 20/02/2023 20 BABA LOKENATH ENTERPRISE 13.91 13.91 0
1565 Durgapur W/S Division Formal-Order for the work of Laying and aligning of distribution network of command area of Kanksa (Zone-II/C) and other allied works under Augmentation of Kanksa (Zone-II/Part-C) piped W/s Scheme ORD/000444/2022-2023 301/DWSD 20/02/2023 20 BABA LOKENATH ENTERPRISE 16.09 16.09 0
1566 Durgapur W/S Division Acceptance order for the work of Supplying and laying of 150 mm dia DIC (K9) & 150 mm dia HDPE pipe line with necessary allied works at Kanksa block of Anandpur to Silampur under Augmentation of Kanksa (Zone-I) piped W/s Scheme (JJM) under DWSD ,PHE Dte ORD/000445/2022-2023 108/DWSD 24/01/2023 20 A.K.D. ENTERPRISE 4.96 4.78 100
1567 Durgapur W/S Division Acceptance cum formal order for the work of Laying of distribution pipe line for (FHTC) in connection with JJM and additional work of Solar Tube well site and necessary allied work at Huchukdanga village ,Paschim Bardhaman under DWSD, PHE Dte (SL-10) ORD/000446/2021-2022 425/DWSD 30/03/2022 10 RANJIB GHATAK 3.81 3.80 0
1568 Durgapur W/S Division Formal order for the work of Sinking of 5 Nos 200 mm dia river bed tube wells with collecting main with manifold in river Ajoy at Ramnagar H/W site (Part-A) under Augmentation of RCFA Part-III (Zone-II/JJM) piped W/S Scheme under DWSD,PHE Dte. ORD/000446/2022-2023 389/DWSD 01/03/2023 15 RANJIB GHATAK 35.85 35.60 100
1569 Durgapur W/S Division Acceptance cum formal order for the work of Extension of pipe line from existing pipe line of Kanksa zone -II Ph-II W/s Scheme to combat draught like situation in Kaksa Block to providing FHTC at Debipur Mouza (JL-87)(Part-D) under DWSD,PHE Dte (SL-56) ORD/000447/2020-2021 301/DWSD 26/02/2021 30 MANAS KUMAR SAHA 4.31 8.62 0
1570 Durgapur W/S Division Acceptance cum formal order for the work of Urgent repairing of 250 mm dia pipe line and UPVC pipe line with necessary allied works at Silampur ,Gungbill an Aymma Biswanathpur distribution area under Kanksa (Zone-I) Pipe W/s Scheme under DWSD, PHE Dte. ORD/000447/2021-2022 426/DWSD 30/03/2022 10 MD AAMIR KHAN 4.82 4.76 0
1571 Durgapur W/S Division Formal order for the work of Sinking of 6 Nos 200 mm dia river bed tube wells with collecting main with manifold in river Ajoy at Ramnagar H/W site (Part-B) under Augmentation of RCFA Part-III (Zone-II/JJM) piped W/S Scheme under DWSD,PHE Dte. ORD/000447/2022-2023 390/DWSD 01/03/2023 20 RANJIB GHATAK 42.39 42.33 100
1572 Durgapur W/S Division Acceptance cum formal order for the work Extension of pipe line from existing pipe line of Kanksa zone -II Ph-II W/s Scheme to combat draught like situation in Kaksa Block to providing FHTC at Debipur Mouza (JL-87)(Part-E) under DWSD,PHE Dte(SL-57) ORD/000448/2020-2021 302/DWSD 26/02/2021 30 MANAS KUMAR SAHA 4.98 9.96 0
1573 Durgapur W/S Division Acceptance order for the work of Balance work for construction of boundary wall at Gopalpur H/W site (OHR) site of Augmentation of Gopalpur piped W/s Scheme under DWSD,PHE Dte ORD/000448/2022-2023 111/DWSD 24/01/2023 15 D. S. ENTERPRISE 4.36 4.34 0
1574 Durgapur W/S Division Acceptance cum formal order for the work of Rearing of pump house -I boundary wall and plinth protection at Silampur under Kanksa (Zone-I) for Augmentation of ground water based Kanksa (Zone-I) piped W/s Scheme under DWSD, PHE Dte.(SL-13) ORD/000449/2021-2022 428/DWSD 30/03/2022 15 BASANTI TRADERS 4.84 1.46 0
1575 Durgapur W/S Division formal order for the work of Repairing ,shifting and replacing of UPVC pipe line and allied works at Fulbagan More to WBSEDCL office under Augmentation of RCFA Part-III (Zone-II) piped W/S Scheme under DWSD ,PHE Dte ORD/000449/2022-2023 388/DWSD 01/03/2023 20 RANJIB GHATAK 6.59 6.58 0
1576 Durgapur W/S Division Acceptance order for the work of Laying and aligning rising main pipe line supplying of DI specials ,valves and allied works at Akandara under command area of Augmentation of Kanksa (Zone-II/C)(Part-B) piped W/s Scheme under DWSD ,PHE Dte. ORD/000450/2022-2023 298/DWSD 20/02/2023 30 MAK CONSTRUCTION CO. 92.36 91.71 0
1577 Durgapur W/S Division Formal order for the work of balance work of Augmentation of Kanksa (Zone-II/Part-A) piped W/s Scheme with construction of boundary wall ,approach road,canal crossing ,leftout LDS,FHTC reconnection of FHTC at Kansa(Part),Debipur(Part),Panagarh(Part),Ijjatganj(Part), mouzas of JL-86,88,87,85 of Kanksa block under DWSD ,PHE Dte (SL-03) ORD/000451/2022-2023 225/DWSD 06/02/2023 90 SAIKAT RAY 197.71 163.93 100
1578 Durgapur W/S Division Acceptance cum formal order for the work of Dismantling and reconcreting of PCC road for extension of pipe line from existing pipe line of Kanksa (Zone-II) (Phase-II) W/s Scheme to laying branch pipe line in Kanksa block to providing FHTC at Kanksa Mouza (JL-89) at Jhinuk Raia Hotel para ,Duck bungalow colony para under DWSD, PHE Dte.(SL-16) ORD/000452/2021-2022 431/DWSD 30/03/2022 15 GITA CONSTRUCTION 4.95 4.95 0
1579 Durgapur W/S Division Acceptance cum formal order for the work of Sinking of 06 Nos 300X200 mm dia Tube well with 210 mtr Depth by DR rig method using UPVC pipe (CD and UPVC deep well screen (RDS) at Kanksa (Zone-II) Part-B,C tube well site of Augmentation of Kanksa Zone-II(Part-B & C) piped W/s Scheme under DWSD ,PHE Dte (SL-02) ORD/000454/2022-2023 254/DWSD 15/02/2023 60 JOY GURU ENTERPRISE 94.05 92.20 0
1580 Durgapur W/S Division Acceptance cum formal order for the work of Additional bore for sinking of 01 Nos (300X200 mm dia) tube well of 210 mtr deep by DR drilling method using PVC pipe and fiber glass reinforced epoxy resin slotted at Tube well No-I at Railpar Sarod Pally near DVC branch canal under Augmentation of Kanksa (Zone-II/Part-D) piped W/s Scheme under DWSD ,PHE Dte.(SL-01) ORD/000455/2021-2022 376/DWSD 24/03/2022 7 JOY GURU ENTERPRISE 4.40 2.92 0
1581 Durgapur W/S Division Acceptance cum formal order for the work of Sinking of 01 Nos 300X200 mm dia Tube well with 210 mtr deapth by DR rig method using UPVC pipe (CD and UPVC deep well screen (RDS) at Roogganj H/W site of Kanksa Block of Augmentation of Roopganj piped W/s Scheme udner DWSD ,PHE Dte ORD/000455/2022-2023 308/DWSD 20/02/2023 15 M/S BADAL GHOSH 15.73 13.44 0
1582 Durgapur W/S Division Acceptance cum formal order for the work of Additional bore for sinking of 01 Nos (300X200 mm dia) tube well of 210 mtr deep by DR drilling method using PVC pipe and fiber glass reinforced epoxy resin slotted at Tube well No-II at Railpar Sarada Pally near DVC branch canal under Augmentation of Kanksa (Zone-II/Part-D) piped W/s Scheme under DWSD ,PHE Dte. (SL-02) ORD/000456/2021-2022 377/DWSD 24/03/2022 7 RANJIB GHATAK 4.39 3.78 0
1583 Durgapur W/S Division Acceptance cum formal order for the work of Sinking of 03 Nos 300X200 mm dia Tube well with 210 mtr deapth by DR rig method using UPVC pipe (CD and UPVC deep well screen (RDS) at TETIKHOLA H/W site & TW-II site of Durgapur-Faridpur Block under TETIKHOLA piped W/s Scheme under DWSD ,PHE Dte ORD/000456/2022-2023 309/DWSD 20/02/2023 681 M/S. D. PALIT & CO. 47.15 0.00 100
1584 Durgapur W/S Division Acceptance cum formal order for the work of Additional bore for sinking of 01 Nos (300X200 mm dia) tube well of 210 mtr deep by DR drilling method using PVC pipe and fiber glass reinforced epoxy resin slotted at Tube well No-III at Railpar Sarada Pally near DVC branch canal under Augmentation of Kanksa (Zone-II/Part-D) piped W/s Scheme under DWSD ,PHE Dte.(SL-03) ORD/000457/2021-2022 378/DWSD 24/03/2022 7 AHS R INFRA PRIVATE LIMITED 4.40 3.29 0
1585 Durgapur W/S Division Acceptance cum formal order for the work of Water supply arrangement at Ruidas para ICDS Centre of Akandara for having no Electricity power supply to provide solar power connection (For 350 Nos Students), Kanksa Block under Retrofitting of Arraha piped W/s Scheme under DWSD ,PHE Dte ORD/000457/2022-2023 310/DWSD 20/02/2023 15 QUICK PAL SUPPLIERS 6.96 6.96 100
1586 Durgapur W/S Division Acceptance cum formal order for the work of Construction of Pump house cum Chlorine room at Madhabmat Pump house No-I tube well no-1 for Augmentation of Kanksa (Zone-II/Part-A) piped W/S Scheme under DWSD, PHE Dte (SL-04) ORD/000458/2021-2022 379/DWSD 24/03/2022 45 MUKHERJEE ENTERPRISE 4.89 4.70 0
1587 Durgapur W/S Division Acceptance cum formal order for the work of Water supply arrangement at Akandara Bouri para ICDS Centre of Akandara for having no Electricity power supply to provide solar power connection (For 350 Nos Students), Kanksa Block under Retrofitting of Arraha piped W/s Scheme under DWSD ,PHE Dte ORD/000458/2022-2023 311/DWSD 20/02/2023 15 M/S MONDAL ENTERPRISE 6.94 6.87 0
1588 Durgapur W/S Division Acceptance cum formal order for the work of Construction of Pump house cum Chlorine room at Madhabmat Pump house No-II tube well no-2 for Augmentation of Kanksa (Zone-II/Part-A) piped W/S Scheme under DWSD, PHE Dte(SL-05) ORD/000459/2021-2022 583/DWSD 25/03/2022 45 GHOSH & ROY ENTERPRISE 4.89 4.69 0
1589 Durgapur W/S Division Acceptance cum formal order for the work of Water supply arrangement at Hazra para ICDS Centre of Akandara for having no Electricity power supply to provide solar power connection (For 350 Nos Students), Kanksa Block under Retrofitting of Arraha piped W/s Scheme under DWSD ,PHE Dte ORD/000460/2022-2023 312/DWSD 20/02/2023 15 GHOSH ENTERPRISE 6.92 6.92 0
1590 Durgapur W/S Division Acceptance cum formal order for the work of Construction of Pump house cum Chlorine room at Madhabmat Pump house No-III tube well no-3 for Augmentation of Kanksa (Zone-II/Part-A) piped W/S Scheme under DWSD, PHE Dte (SL-06) ORD/000461/2021-2022 385/DWSD 25/03/2022 45 A.K.D. ENTERPRISE 4.89 4.70 0
1591 Durgapur W/S Division Acceptance cum formal order for the work of water supply arrangement at Muslim Para ICDS Centre of Akandara for having no Electricity power supply to provide solar power connection (For 350 Nos Students),Kanksa Block under Retrofitting of Arraha piped W/s Scheme under DWSD ,PHE Dte ORD/000461/2022-2023 313/DWSD 20/02/2023 15 RUBY CONSTRUCTION 6.96 6.96 0
1592 Durgapur W/S Division Acceptance cum formal order for the work of Extension of pipe line from existing pipe line of Kanksa (Zone-II) Ph-II W/s Scheme to combat draught like situation in Kanksa block to providing FHTC at Prayagpur Mouza(JL-88)(Part-C) under DWSD,PHE Dte ORD/000462/2020-2021 317/DWSD 26/02/2021 30 B. T. M. CONCERN 4.98 4.98 0
1593 Durgapur W/S Division Acceptance cum formal order for the work of Water supply arrangement at Akandara Adibasipara ICDS Centre of Akandara for having no Electricity power supply to provide solar power connection (For 350 Nos Students), Kanksa Block under Retrofitting of Arraha piped W/s Scheme under DWSD ,PHE Dte ORD/000462/2022-2023 314/DWSD 20/02/2023 15 JUBILEE CONSTRUCTION 6.95 6.95 0
1594 Durgapur W/S Division Acceptance cum formal order for the work of Water supply arrangement 1(One) No ICDS Centre at Shyambazar for having no Electricity power supply to provide solar power connection (For 350 Nos Students), Kanksa Block under Retrofitting of Arraha piped W/s Scheme under DWSD ,PHE Dte ORD/000463/2022-2023 315/DWSD 20/02/2023 15 KIRON ENTERPRISE 12.15 11.92 0
1595 Durgapur W/S Division Acceptance cum formal order for the work of water supply arrangement at Jatgoria Junior High School ICDS Centre having no Electricity power supply to provide solar power connection (For 350 Nos Students),Kanksa Block under Retrofitting of Arraha piped W/s Scheme under DWSD ,PHE Dte ORD/000464/2022-2023 316/DWSD 20/02/2023 15 BASANTI TRADERS 6.95 6.95 0
1596 Durgapur W/S Division Continuation order for the work of soil investigation for determining the safe bearing capacity and other relevant parameters of soil for the work of construction of RCC Elevated At Molandighi Reservoir site of Bistupur W/s Scheme under DWSD,PHE Dte ORD/000467/2021-2022 303/DWSD 10/03/2022 25 MABCO CONSULTANT 1.20 1.20 0
1597 Durgapur W/S Division Acceptance cum formal order for the work of Water supply arrangement at Borobigha Adibasi para ICDS Centre of Domra Bagdipara ICDS, Domra Bagdipara,Satkahania billpara for having no Electricity power supply to provide solar power connection (For 350 Nos Students), Kanksa Block under Retrofitting of Arraha piped W/s Scheme under DWSD ,PHE Dte ORD/000467/2022-2023 263/DWSD 15/02/2023 25 BISHAL ENTERPRISE 21.24 21.24 0
1598 Durgapur W/S Division Continuation for the work of soil investigation for demining the safe bearing capacity and other relevant parameters of soil for the work of construction of RCC Elevated at Gopalpur Reservoir site of Augmentation of Gopalpur W/s Scheme under DWSD ,PHEDte ORD/000468/2021-2022 353/DWSD 21/03/2022 25 MABCO CONSULTANT 1.20 1.20 0
1599 Durgapur W/S Division Continuation order for the work of soil investigation for demining the safe bearing capacity and other relevant parameters of soil for the work of construction of RCC Elevated at Sarada Pally reservoir site of Augmentation of Kaksa Zone-II/D piped W/s Scheme under DWSD ,.PHE Dte ORD/000469/2021-2022 287/DWSD 08/03/2022 25 MABCO CONSULTANT 1.20 1.20 0
1600 Durgapur W/S Division Continuation order for the work of soil investigation for determing the safe bearing capacity and other relevant parameters of soil for the work of construction of RCC elevated at Madhabmath Reservoir site of Augmentation of Kanksa (Zone-II/A) piped W.S Scheme under DWSD ,PHE DTe. ORD/000470/2021-2022 354/DWSD 21/03/2022 25 MABCO CONSULTANT 1.20 1.20 0
1601 Durgapur W/S Division Acceptance cum formal order for the work of Water supply arrangement at Kajladighi ICDS Centre of Bibihar GP having no Electricity power supply to provide solar power connection (For 350 Nos Students), Kanksa Block under Aug: of Gopalpur piped W/s Scheme under DWSD ,PHE Dte ORD/000471/2022-2023 294/DWSD 17/02/2023 15 RANJIB GHATAK 6.95 6.95 100
1602 Durgapur W/S Division Continuation order for the work of additional number of FHTC in connection with JJM Ichhapur(Mouza-91) with extension of branch pipe line of command area of Gourbazar-Ichhapur W/s Scheme at Durgapur-Faridpur block under DWSD,PHE Dte ORD/000472/2021-2022 1631/DWSD 18/11/2021 15 SHWET BARANI 3.99 0.00 100
1603 Durgapur W/S Division Continuation order for the work of additional number of FHTC in connection with JJM Ichhapur(Mouza-91) with extension of branch pipe line of command area of Gourbazar-Ichhapur W/s Scheme at Durgapur-Faridpur block under DWSD,PHE Dte ORD/000473/2021-2022 1632/DWSD 18/11/2021 15 SHWET BARANI 3.99 3.99 100
1604 Durgapur W/S Division Continuation order for the work of additional number of FHTC in connection with JJM Ichhapur(Mouza-91) with extension of branch pipe line of command area of Gourbazar-Ichhapur W/s Scheme at Durgapur-Faridpur block under DWSD,PHE Dte ORD/000474/2021-2022 180/DWSD 11/02/2022 15 SHWET BARANI 4.12 0.00 100
1605 Durgapur W/S Division Continuation order for the work of additional number of FHTC in connection with JJM Ichhapur(Mouza-91) with extension of branch pipe line of command area of Gourbazar-Ichhapur W/s Scheme at Durgapur-Faridpur block under DWSD,PHE Dte ORD/000475/2021-2022 179/DWSD 11/02/2022 15 SHWET BARANI 3.99 3.99 100
1606 Durgapur W/S Division Formal order for the work of Balance work of Augmentation of Kanksa (Zone-II/Part-B) piped W/s Scheme with construction of boundary wall renovation of all existing structure ,repairing of all water retaining structure ,let-out LDS,FHTC,Re connection of FHTC at Kanksa (Part) ,Debipur(Part),Paragraph (Part), Prayagpur(Part) mouzas of JL No-86,88,87,88 of Kanksa block under DWSD ,PHE Dte ORD/000475/2022-2023 238/DWSD 08/02/2023 90 MD AAMIR KHAN 181.79 180.81 100
1607 Durgapur W/S Division Continuation order for the work of extension of pipe line from the existing pipe line from command area of Gourbazar-Ichhapur piped W/s Scheme of Ichhapur area fro providing of FHTC at Ichhapur mouza(JL-50) under DWSD ,PHE Dte ORD/000476/2021-2022 192/DWSD 15/02/2022 15 SHWET BARANI 4.45 4.45 100
1608 Durgapur W/S Division Acceptance cum formal order for the work of Re-connection of exiting FHTC from AC pipe line to newly laid different dia pipe line FHTC and also few new connection with JJM for Roopganj mouza (JL-54) under command area of Augmentation of Roopganj W/s Scheme,Block-Kanksa under DWSD ,PHE Dte. ORD/000478/2022-2023 317/DWSD 20/02/2023 25 M/S BADAL GHOSH 57.68 50.62 0
1609 Durgapur W/S Division Acceptance cum formal order for the work of Additional work for supplying ,laying and alinging of HDPE distribution pipe line and allied works at Railpar Saroda Pally of Kanksa mouza under command area of Augmentation of Kanksa piped W/s Scheme under DWSD ,PHE Dte (Part-B) ORD/000479/2022-2023 318/DWSD 20/02/2023 800 AMARANJALI CONSTRUCTION 60.53 24.40 80
1610 Durgapur W/S Division Continuation order for Acceptance cum formal order for the work of Hiring of LUXURY Diesel Ambassador Car including higher model 2012 onwards of Diesel Ambassador or equivalent for official use for the Executive Engineer, DWSD,PHE Dte ADDA Administrative building 2nd Floor, EPIP Complex,Banskopa,DGP-12 (w.e.f 18.02.2023 to 17.08.2023). (SL-02) ORD/000501/2022-2023 133/DWSD 31/01/2023 181 PRAMIT CHATTERJEE 0.82 2.39 80
1611 Durgapur W/S Division Continuation order for Acceptance cum formal order for the work of Hiring of LUXURY Diesel Ambassador Car including higher model 2012 onwards of Diesel Ambassador or equivalent for official use (Inspection Vehicle) of Assistant Engineer for the office of the Executive Engineer ,Durgapur Water Supply Division, Public Health Engineering (w.e.f 01.03.2023 to 31.08.2023). (Sl-01) ORD/000502/2022-2023 134/DWSD 31/01/2023 181 BIPLAB BANERJEE 0.82 2.40 80
1612 Durgapur W/S Division Acceptance cum formal order for the work of balance work for supplying and laying of HDPE distribution pipe line construction of pipe carrying structure and allied works at Railpar of Prayagpur mouza under AUGMENTATION OF GROUND WATER BASED WATER SUPPLY SCHEME FOR DANDESHWAR, UNDER DURGAPUR W/S DIVISION , BLOCK : KANKSA, DISTRICT : PASCHIM BARDDHAMAN ORD/000504/2022-2023 320/DWSD 20/02/2023 20 SAIKAT RAY 87.40 72.20 100
1613 Durgapur W/S Division Acceptance cum formal order for the work of construction of boundary wall at TETIKHOLA pump house site No-2 under Tetikhola piped W/s Scheme under DWSD ,PHE Dte ORD/000505/2022-2023 321/DWSD 20/02/2023 30 CHATTERJEE CONSTRUCTION 15.35 0.00 0
1614 Durgapur W/S Division Acceptance cum formal order for the work of Construction of 5.40 X3.60 mtr switch room with plinth height (600X 2000 mm) with sanitary and water supply arrangement at OHR site Arrah Shibtala of Augmentation of Bamunara piped W/S Scheme under DWSD ,PHE Dte ORD/000506/2022-2023 323/DWSD 20/02/2023 30 NANDADULAL KONAR 6.92 6.92 100
1615 Durgapur W/S Division Acceptance cum formal order for the work of Construction of 5.40 X3.60 mtr switch room with plinth height (600X 2000 mm) with sanitary and water supply arrangement at TW No-2 site at Tetikhola H/W site under Tetikhola piped W/S Scheme under DWSD ,PHE Dte ORD/000507/2022-2023 324/DWSD 20/02/2023 35 MUKHERJEE ENTERPRISE 13.83 0.00 0
1616 Durgapur W/S Division Acceptance cum formal order for the work of Laying ,aligning of DI K9 rising main pipe and interconnection between 3 TW with OHR and other allied works of Augmentation of Roopganj piped W/S Scheme under DWSD ,PHE Dte ORD/000508/2022-2023 325/DWSD 20/02/2023 25 M/S KALYANI ENTERPRISE 24.33 13.25 100
1617 Durgapur W/S Division Acceptance cum formal order for the work of Additional work for laying of HDPE pipe line and providing FHTC in connection with JJM at Arrah mouza (JL-89) under command area of Augmentation of Dandeswar piped W/s Scheme under DWSD ,PHE Dte (Part-B) ORD/000509/2022-2023 326/DWSD 20/02/2023 30 BISHAL ENTERPRISE 81.29 0.00 50
1618 Durgapur W/S Division Acceptance cum formal order for the work of Construction of boundary wall at Arrah H/W site OHR site ,Land development ,approach road and other allied works of Bamunara piped W/s Scheme under DWSD ,PHE Dte ORD/000511/2022-2023 328/DWSD 20/02/2023 35 AMARANJALI CONSTRUCTION 30.43 0.00 0
1619 Durgapur W/S Division Acceptance cum formal order for the work of Construction of 5.40 X3.60 mtr switch room with plinth height (600X 2000 mm) with sanitary and water supply arrangemnt at PH No-3 TW No-3 site of Augmentation of Roopganj piped W/S Scheme under DWSD ,PHE Dte. ORD/000512/2022-2023 329/DWSD 20/02/2023 30 MAA KHEPIMAYER CHARANE 6.90 0.00 0
1620 Durgapur W/S Division Acceptance cum formal order for the work of Construction of boundary wall at Tetikhola H/W site (OHR ) site ,land development ,approach road and others allied works of Augmentation of Tetikhola piped W/s Scheme under DWSD ,PHE Dte ORD/000513/2022-2023 330/DWSD 20/02/2023 30 BISHAL ENTERPRISE 34.05 0.00 0
1621 Durgapur W/S Division Acceptance cum formal order for the work of Construction of boundary wall at Akandara Pump house site TW No-2 site under Jemua piped W/s Scheme under DWSD ,PHE Dte ORD/000515/2022-2023 332/DWSD 20/02/2023 30 DARPAN DAS & CO. 15.05 8.45 100
1622 Durgapur W/S Division Acceptance cum formal order for the work of Construction of boundary wall at Bistupur H/W Site PH No-1 ,TW No-1 site under Augmentation Bistupur piped W/s Scheme under DWSD ,PHE Dte ORD/000517/2022-2023 334/DWSD 20/02/2023 20 M/S SHYAM KANTA GHOSH 27.51 0.00 0
1623 Durgapur W/S Division Acceptance cum formal order for the work of Construction of 5.40 X3.60 mtr switch room with plinth height (600X 2000 mm) with sanitary and water supply arrangemnt at TW No-3 site at Tetikhola under Tetikhola piped W/S Scheme under DWSD ,PHE Dte ORD/000518/2022-2023 335/DWSD 20/02/2023 25 M/S BANERJEE CONSTRUCTION 6.88 6.88 100
1624 Durgapur W/S Division Acceptance cum formal order for the work of Balance work for laying of HDPE pipe line for providing FHTC in connection with JJM at Arrah mouza (JL-89) part-C under command area of Augmentation of Roopganj piped W/s Scheme under DWSD ,PHE Dte ORD/000519/2022-2023 319/DWSD 20/02/2023 20 M/S BADAL GHOSH 97.20 73.70 100
1625 Durgapur W/S Division Acceptance cum formal order for the work of Construction of boundary wall at TETIKHOLA pump house site No-3 under Tetikhola piped W/s Scheme under DWSD ,PHE Dte ORD/000520/2022-2023 322/DWSD 20/02/2023 30 BABA LOKENATH ENTERPRISE 15.35 0.00 0
1626 Durgapur W/S Division Acceptance cum formal order for the work of Construction of boundary wall at Madhabmat H/W site (PH No-2,TW No-2) site under Bistupur piped W/s Scheme under DWSD ,PHE Dte ORD/000521/2022-2023 336/DWSD 20/02/2023 20 GHOSH & ROY ENTERPRISE 18.36 15.74 0
1627 Durgapur W/S Division Acceptance cum formal order for the work-Construction of boundary wall at Saraswatiganj H/W site (PH No-2,TW No-2) site under Bistupur piped W/s Scheme under DWSD ,PHE Dte ORD/000522/2022-2023 337/DWSD 20/02/2023 30 CHATTERJEE CONSTRUCTION 10.68 6.07 100
1628 Durgapur W/S Division Acceptance cum formal order for the work of Construction of boundary wall at Ghatakdanga H/W site (PH No-3,TW No-3) site under Bistupur piped W/s Scheme under DWSD ,PHE Dte ORD/000523/2022-2023 286/A/DWSD 16/02/2023 30 DARPAN DAS & CO. 12.08 0.00 0
1629 Durgapur W/S Division Acceptance cum formal order for the work of Construction of boundary wall at Madhabmat H/W site (PH No-3,TW No-3) site under Augmentation of Kanksa Zone-II/Part-A piped W/s Scheme under DWSD ,PHE Dte ORD/000524/2022-2023 297/A/DWSD 17/02/2023 30 A.K.D. ENTERPRISE 11.08 9.88 0
1630 Durgapur W/S Division Acceptance cum formal order for the work of Route survey and preparation of DPr for Augmentation of Garkilla-Kherobari,Banagram, Kotalpur, Dhobaru piped W/s Scheme under DWSD, PHE Dte ORD/000562/2022-2023 525/DWSD 29/03/2023 15 MEASURE LAND 9.24 9.24 0
1631 Durgapur W/S Division Acceptance cum formal order for the work of Route survey and preparation of DPR for Augmentation of Bistupur ,Bamunara piped W/s Scheme under DWSD, PHE Dte ORD/000563/2022-2023 526/DWSD 29/03/2023 15 MEASURE LAND 8.11 7.62 0
1632 Durgapur W/S Division Acceptance cum formal order for the work of Route survey and preparation of DPR for Augmentation of Shyambazar ,Telipara piped W/s Scheme under DWSD, PHE Dte ORD/000564/2022-2023 527/DWSD 29/03/2023 15 MEASURE LAND 5.00 5.00 0
1633 Durgapur W/S Division Acceptance cum formal order for the work of Route survey and preparation of DPR for Augmentation of Amlajora, Birudiha piped W/s Scheme and Kataberia PWSS under DWSD, PHE Dte ORD/000565/2022-2023 528/DWSD 29/03/2023 15 MEASURE LAND 7.53 7.53 0
1634 Durgapur W/S Division Acceptance cum formal order for the work of Route survey and preparation of DPR for Augmentation of Jatgoria ,Napara and Dandeswar piped W/s Scheme and Kataberia PWSS under DWSD, PHE Dte ORD/000566/2022-2023 529/DWSD 29/03/2023 15 MEASURE LAND 6.74 6.74 0
1635 Durgapur W/S Division Acceptance cum formal order for the work of Construction of boundary wall at Jamdoba of Telipara W/s Scheme pump house No-II under DWSD ,PHE Dte ORD/000567/2022-2023 481/DWSD 22/03/2023 45 MUKHERJEE ENTERPRISE 14.92 12.84 100
1636 Durgapur W/S Division Acceptance cum formal order for the work of Dismantling of concrete road for laying distribution system rising main construction of 350 M3 reservoir with 20 mtr staging height including soil investigation construction of pump house (5.40 X 3.60 m) with sanitary and construction of pump house 3.60 X 3.00 m) for Amlajora piped W/s Scheme under DWSD ,PHE Dte ORD/000569/2022-2023 488/DWSD 23/03/2023 15 RANADHIR SINHA 5.99 5.99 0
1637 Durgapur W/S Division Acceptance cum formal order for the work of Dismantling of concrete road for laying distribution system rising main construction of 350 M3 reservoir with 20 mtr staging height including soil investigation construction of pump house (5.40 X 3.60 m) with sanitary and construction of pump house 3.60 X 3.00 m) for Napara piped W/s Scheme under DWSD ,PHE Dte ORD/000570/2022-2023 489/DWSD 23/03/2023 20 SK. ABDUL HALIM 4.39 4.39 0
1638 Durgapur W/S Division Acceptance cum formal order for the work of Balance work of Augmentation of Kanksa Zone-ii/C piped W/s Scheme with construction of boundary wall renovation of all existing structure repairing of all water retaining structure left out LDS FHTC reconnection of FHTC at Kanksa (Part) ,Debipur (Part), Paragraph (Part), Prayagpur(Part) mouzas of JL-86,88,87 of Kanksa block under DWSD ,PHE Dte ORD/000572/2022-2023 490/DWSD 23/03/2023 45 BRINDABAN KONAR 94.94 3.85 100
1639 Durgapur W/S Division Acceptance cum formal order for the work of Construction of boundary wall at Khatgoria H/W (OHR) site of land development approach road and others allied works of Kantaberia Piped W/s Scheme under DWSD ,PHE Dte ORD/000580/2022-2023 491/DWSD 24/03/2023 45 GHOSH & ROY ENTERPRISE 33.88 33.34 100
1640 Durgapur W/S Division Acceptance cum formal order for the work of Constructions of 5.40 X 3.6 m switch room with plinth height (600 X 2000 mm ) with sanitary and water supply arrangement at Kataberia TW no -II of Kataberia piped W/s Scheme under DWSD PHE Dte ORD/000581/2022-2023 495/DWSD 24/03/2023 45 M/S MONDAL ENTERPRISE 6.84 0.00 0
1641 Durgapur W/S Division Acceptance cum formal order for the work of Supplying laying and aligning of HDPE distribution system with construction of 150 M3 capacity 20 mtr staging height RCC OHR including pipe connection and soil investigation at Kataberia piped W/s Scheme under DWSD PHE Dte (SL-9) ORD/000594/2022-2023 499/DWSD 27/03/2023 827 M/S K.B.CONSTRUCTION 99.75 50.33 55
1642 Durgapur W/S Division Acceptance cum formal order for the work Balance work for construction of pump house with approach road and others allied works at Jamdoba pump house No-II Telipara piped W/s Scheme under DWSD ,PHE Dte. ORD/000595/2022-2023 579/DWSD 10/03/2023 20 MUKHERJEE ENTERPRISE 5.68 5.68 100
1643 Durgapur W/S Division Acceptance cum formal order for the work of laying and aligning of DI K9 R/M pipe line supplying DI specials valves and allied works under Command area of Kataberia piped W/s Scheme under DWSD ,PHE Dte ORD/000603/2022-2023 500/DWSD 27/03/2023 30 KANJILAL & CO. 18.30 4.08 60
1644 Durgapur W/S Division Acceptance cum formal order for the work of Balance work for supplying laying and aligning of HDPE distribution pipe line and allied works including FHTC and connection providing to JAMDOBA mouzas JL-40 and Paschim Telipara mouzas JL-41 of Augmentation of Telipara W/s Scheme under DWSD under ORD/000604/2022-2023 501/DWSD 27/03/2023 60 M/S SANTANU PALIT & CO. 93.42 16.88 80
1645 Durgapur W/S Division Acceptance cum formal order for the work of Laying ,aligning of DI K9 R/M pipe and interconnection between 3 Nos Tube well with OHR and other allied works of Tetikhola piped W/s Scheme under DWSD ,PHE Dte ORD/000605/2022-2023 504/DWSD 28/03/2023 25 BISHAL ENTERPRISE 48.29 0.00 50
1646 Durgapur W/S Division Acceptance cum formal order for the work of Supplying laying and aligning of HDPE distribution pipe line and allied works including FHTC and connection providing to Kataberia mouzas JL-50 part-A under command area of augmentation of Kantaberia & Bistupur piped W/s Scheme under DWSD ,PHE Dte ORD/000606/2022-2023 504/A/DWSD 28/03/2023 40 BISHAL ENTERPRISE 78.86 74.88 100
1647 Durgapur W/S Division Water supply arrangement to 6(Six) Nos AWC without electricity at Jamdoba,Telipara, Nabagram Majhiara & other allied works under Telipara Piped Water Supply Scheme.(TSM/004035) under DWSD,PHE Dte ORD/000665/2022-2023 625/A/DWSD 21/04/2022 20 B. T. M. CONCERN 34.06 32.79 100
1648 Durgapur W/S Division Laying additional distribution pipeline with necessary allied works for providing FHTC work under Durgapur-Faridpur Block of Augmentation of RCFA Part-III W/s Scheme (Zone-I) under DWSD,PHE Dte ORD/000666/2022-2023 1146/DWSD. 04/07/2022 20 SHWET BARANI 5.69 5.64 100
1649 Durgapur W/S Division Continuation order for the work of Supplying ,laying and aligning of HDPE/DI distribution pipe line and allied works including functinal household tap connection (FHTC) and connection provided to ICDS ,Health Centre ,Govt Bioldings school under the command area of Gopalpur mouza of Augmentation of Gopalpur piped W/s Scheme under Durgapur W/S Division, PHE Dte. ORD/000689/2022-2023 700/DWSD 29/04/2022 90 MRITYUNJOY MUKHERJEE AND CO 66.45 65.80 100
1650 Durgapur W/S Division Continuation order for supplying laying and aligning of UPVC distribution pipe line and allied works including FHTC and connection providing to Akandara (JL-47) ,Molandighi (JL-48),Kandarakona (JL-51),Rakhitpur (JL-42) ,Chua(JL-43),Bhagaabanpur (JL-45),Hariki(JL-50) Mouzas under command area of Bistupur distributin system (Part-A) of Augmentation of Gopalpur piped W/s Scheme under DWSD,PHE Dte ORD/000691/2022-2023 702/DWSD 29/04/2022 25 MACHINO TECHNO 67.70 67.42 100
1651 Durgapur W/S Division Material Requisition To Resource Division RTOR000001/2022-2023 1228/DWSD 17/08/2022 0 Resource Division 9.52 0.00 0
1652 Durgapur W/S Division Material Requisition To Resource Division RTOR000002/2021-2022 1751/DWSD 16/12/2021 0 Resource Division 1.27 0.00 0
1653 Durgapur W/S Division Material Requisition To Resource Division RTOR000002/2022-2023 1230/DWSD 17/08/2022 0 Resource Division 46.44 0.00 0
1654 Durgapur W/S Division Material Requisition To Resource Division RTOR000002/2023-2024 694/DWSd 08/05/2023 0 Resource Division 21.35 0.00 0
1655 Durgapur W/S Division Material Requisition To Resource Division RTOR000003/2021-2022 1752/DWSD 16/12/2021 0 Resource Division 1.27 0.00 0
1656 Durgapur W/S Division Material Requisition To Resource Division RTOR000003/2023-2024 786/DWSD 25/05/2023 0 Resource Division 172.10 0.00 0
1657 Durgapur W/S Division Material Requisition To Resource Division RTOR000004/2021-2022 1816/DWSD 30/12/2021 0 Resource Division 20.35 0.00 0
1658 Durgapur W/S Division Material Requisition To Resource Division RTOR000004/2022-2023 1231/DWSD 17/08/2022 0 Resource Division 18.93 0.00 0
1659 Durgapur W/S Division Material Requisition To Resource Division RTOR000004/2023-2024 787/DWSD 25/05/2023 0 Resource Division 25.85 0.00 0
1660 Durgapur W/S Division Material Requisition To Resource Division RTOR000005/2021-2022 1815/DWSD 30/12/2021 0 Resource Division 19.80 0.00 0
1661 Durgapur W/S Division Material Requisition To Resource Division RTOR000005/2022-2023 1377/DWSD 22/09/2022 0 Resource Division 61.60 0.00 0
1662 Durgapur W/S Division Material Requisition To Resource Division RTOR000005/2023-2024 789/DWSD 25/05/2023 0 Resource Division 7.07 0.00 0
1663 Durgapur W/S Division Material Requisition To Resource Division RTOR000006/2021-2022 66/DWSD 19/01/2022 0 Resource Division 80.94 0.00 0
1664 Durgapur W/S Division Material Requisition To Resource Division RTOR000006/2022-2023 255/B/DWSD 15/02/2023 0 Resource Division 4.24 0.00 0
1665 Durgapur W/S Division Material Requisition To Resource Division RTOR000006/2023-2024 788/DWSD 25/05/2023 0 Resource Division 26.40 0.00 0
1666 Durgapur W/S Division Material Requisition To Resource Division RTOR000007/2021-2022 65/DWSD 19/01/2022 0 Resource Division 34.32 0.00 0
1667 Durgapur W/S Division Material Requisition To Resource Division RTOR000007/2022-2023 255/C/DWSD 15/02/2023 0 Resource Division 5.32 0.00 0
1668 Durgapur W/S Division Material Requisition To Resource Division RTOR000007/2023-2024 1557/DWSD 20/09/2023 0 Resource Division 20.93 0.00 0
1669 Durgapur W/S Division Material Requisition To Resource Division RTOR000008/2022-2023 255/D/DWSD 15/02/2023 0 Resource Division 17.04 0.00 0
1670 Durgapur W/S Division Material Requisition To Resource Division RTOR000008/2023-2024 1665/DWSD 12/10/2023 0 Resource Division 922.90 0.00 0
1671 Durgapur W/S Division Material Requisition To Resource Division RTOR000009/2021-2022 307/DWSD 15/03/2022 0 Resource Division 45.42 0.00 0
1672 Durgapur W/S Division Material Requisition To Resource Division RTOR000009/2022-2023 255/F/DWSD 15/02/2023 0 Resource Division 10.47 0.00 0
1673 Durgapur W/S Division Material Requisition To Resource Division RTOR000009/2023-2024 1833/DWSD 06/12/2023 0 Resource Division 236.81 0.00 0
1674 Durgapur W/S Division Material Requisition To Resource Division RTOR000010/2021-2022 327/DWSD 15/03/2022 0 Resource Division 6.60 0.00 0
1675 Durgapur W/S Division Material Requisition To Resource Division RTOR000010/2022-2023 255/E/DWSD 15/02/2023 0 Resource Division 3.88 0.00 0
1676 Durgapur W/S Division Material Requisition To Resource Division RTOR000011/2021-2022 328/DWSD 15/03/2022 0 Resource Division 6.86 0.00 0
1677 Durgapur W/S Division Material Requisition To Resource Division RTOR000011/2022-2023 255/A/DWSD 15/02/2023 0 Resource Division 30.80 0.00 0
1678 Durgapur W/S Division Material Requisition To Resource Division RTOR000012/2021-2022 329/DWSD 15/03/2022 0 Resource Division 45.86 0.00 0
1679 Durgapur W/S Division Material Requisition To Resource Division RTOR000012/2022-2023 256/DWSD 15/02/2023 0 Resource Division 61.60 0.00 0
1680 Durgapur W/S Division Material Requisition To Resource Division RTOR000013/2021-2022 331/DWSD 15/03/2022 0 Resource Division 41.84 0.00 0
1681 Durgapur W/S Division Material Requisition To Resource Division RTOR000013/2022-2023 399/DWSD 03/03/2023 0 Resource Division 7.39 0.00 0
1682 Durgapur W/S Division Material Requisition To Resource Division RTOR000014/2021-2022 330/DWSD 15/03/2022 0 Resource Division 37.85 0.00 0
1683 Durgapur W/S Division Material Requisition To Resource Division RTOR000014/2022-2023 402/DWSD 03/03/2023 0 Resource Division 271.47 0.00 0
1684 Durgapur W/S Division Quatation for Roopganj Pump house no -03 VCH/000220/2022-2023 BP-2022-23-92 14/06/2022 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED 0.29 0.00 0
1685 Durgapur W/S Division Quotation for Gopalpur Pump house no -02 VCH/000221/2022-2023 BP-2022-23-93 14/06/2022 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED 0.48 0.00 0
1686 Durgapur W/S Division Quotation for Gopalpur Pump house no -03 VCH/000222/2022-2023 BP-2022-23-94 14/06/2022 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED 1.81 0.00 0
1687 Durgapur W/S Division Quatation for Bistupur Pump house no -02 VCH/000223/2022-2023 BP-2022-23-95 14/06/2022 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED 15.76 0.00 0
1688 Durgapur W/S Division Quotation for Bistupur Pump house no -03 VCH/000224/2022-2023 BP-2022-23-96 14/06/2022 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED 3.62 0.00 0
1689 Durgapur W/S Division Quotation for Kanksa Zone-II/Part-C Pump house no -01 VCH/000225/2022-2023 BP-2022-23-97 14/06/2022 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED 7.43 0.00 0
1690 Durgapur W/S Division Quotation for Kanksa Zone-II/Part-C Pump house no -02 VCH/000226/2022-2023 BP-2022-23-98 14/06/2022 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED 0.33 0.00 0
1691 Durgapur W/S Division Quotation for Kanksa Zone-II/Part-C Pump house no -03 VCH/000227/2022-2023 BP-2022-23-99 14/06/2022 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED 0.33 0.00 0
1692 Durgapur W/S Division Quotation for Kanksa Zone-II/Part-D Pump house no -01 VCH/000229/2022-2023 BP-2022-23-100 14/06/2022 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED 7.77 0.00 0
1693 Durgapur W/S Division Quotation for Kanksa Zone-II/Part-D Pump house no -02 VCH/000230/2022-2023 BP-2022-23-101 14/06/2022 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED 0.40 0.00 0
1694 Durgapur W/S Division Quotation for Kanksa Zone-II/Part-D Pump house no -03 VCH/000231/2022-2023 BP-2022-23-102 14/06/2022 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED 0.40 0.00 0
1695 Durgapur W/S Division Quatation for Kanksa Zone -I Pump house no -03 VCH/000232/2022-2023 BP-2022-23-103 02/07/2022 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED 9.97 0.00 0
1696 Durgapur W/S Division Quotation for Roopganj Pump house no -04 VCH/000233/2022-2023 BP-2022-23-104 02/07/2022 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED 1.68 0.00 0
1697 Durgapur W/S Division Quotation for Bistupur Pamp House No 1 VCH/000761/2021-2022 BP-2021-22-207 15/03/2022 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED 6.76 0.00 0
1698 Durgapur W/S Division Quotation for Gopalpur Pamp House No 1 VCH/000762/2021-2022 BP-2021-22-208 15/03/2022 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED 3.77 0.00 0
1699 Central Mechanical Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 at Augmentation of Kanksa [Zone-II / D ] Water Supply Scheme under CMD, PHE Dte., Dist.- Paschim -Bardhaman. ORD/000001/2022-2023 732/CMD 29/04/2022 30 JAGANNATH ENTERPRISE 9.67 9.44 0
1700 Central Mechanical Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and internal House Wiring for Tube Well No. -01 at Kotalpukur (Nimtikuri) Water Supply Scheme under CMD, PHE Dte., Paschim-Bardhaman. ORD/000001/2023-2024 1575/CMD 04/04/2023 30 SAIKAT ENTERPRISE 8.99 8.48 100
1701 Central Mechanical Supply & Installation of Submersible Pumping Machinery , Voltage Stabilizer, Chlorination system and internal House wiring for Tube well no.- 2 at Telipara Water Supply Scheme under CMD, PHE Dte., Dist.- Paschim-Bardhaman. ORD/000002/2023-2024 1576/CMD 04/04/2023 30 C.M. ENTERPRISE 9.49 9.26 100
1702 Central Mechanical Supply , delivery & Installation of Submersible Pumping Machinery , Voltage stabiliser , Chlorinator and Internal House wiring for Tube well No. 2 of Bistupur Water Supply Scheme under CMD, PHE Dte., Dist.- Purba-Bardhaman. ORD/000003/2022-2023 734/CMD 29/04/2022 30 MAHADEV ENTERPRISE 9.95 9.73 0
1703 Central Mechanical Supply & Installation of Submersible Pumping Machinery , Voltage Stabilizer, Chlorination system and internal House wiring for Tube well no.- 1 at Garadaha Water Supply Scheme under CMD, PHE Dte., Dist.- Paschim-Bardhaman. ORD/000003/2023-2024 1577/CMD 04/04/2023 30 RAJIB COMPANY 8.97 8.17 100
1704 Central Mechanical Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 at Augmentation of Kanksa [Zone-II / C ] Water Supply Scheme under CMD, PHE Dte., Dist.- Paschim-Bardhaman ORD/000004/2022-2023 735/CMD 29/04/2022 30 STANDARD ELECTRICALS 9.22 8.99 0
1705 Central Mechanical Supply & Installation of Submersible Pumping Machinery , Voltage Stabilizer, Chlorination system and internal House wiring for Tube well no.- 1 at Dhobaru Water Supply Scheme under CMD, PHE Dte., Dist.- Paschim-Bardhaman. ORD/000004/2023-2024 1578/CMD 04/04/2023 30 DUTTA ENTERPRISE 8.97 8.50 100
1706 Central Mechanical Supply & Installation of Submersible Pumping Machinery , Voltage Stabilizer, Chlorination system and internal House wiring for Tube well no.- 1 at Shambazar Water Supply Scheme under CMD, PHE Dte., Dist.- Paschim-Bardhaman. ORD/000005/2023-2024 1579/CMD 04/04/2023 30 MS DAS ELECTRIC CO 9.30 8.87 100
1707 Central Mechanical Supply & Installation of Submersible Pumping Machinery , Voltage Stabilizer, Chlorination system and internal House wiring for Tube well no.- 2 at Shambazar Water Supply Scheme under CMD, PHE Dte., Dist.- Paschim-Bardhaman. ORD/000006/2023-2024 1580/CMD 04/04/2023 30 A.S. ENTERPRISE 9.30 8.81 100
1708 Central Mechanical Supply & Installation of Submersible Pumping Machinery , Voltage Stabilizer, Chlorination system and internal House wiring for Tube well no.- 1 & 2 at Dandeshwar Water Supply Scheme under CMD, PHE Dte., Dist.- Paschim-Bardhaman. ORD/000008/2023-2024 1654/CMD 06/04/2023 30 P.K. ENGINEERING 21.21 20.57 80
1709 Central Mechanical Supply & Installation of Submersible Pumping Machinery, Voltages Stabilizer , Chlorination system and internal House wiring for Tube well for Tube well no:- 1 & 2 at Bamunara water supply scheme under CMD PHE Dte, Dist: Paschim Bardhaman. ORD/000009/2023-2024 1656/CMD 06/04/2023 30 D.K. ELECTRIC 22.77 22.04 100
1710 Central Mechanical Supply & Installation of Submersible Pumping Machinery , Voltage Stabilizer, Chlorination system and internal House wiring for Tube well no.- 1 & 2 at Jatgaria Water Supply Scheme under CMD, PHE Dte., Dist.- Paschim-Bardhaman. ORD/000010/2023-2024 1655/CMD 06/04/2023 30 CHOUDHURY ENTERPRISE 21.07 20.29 40
1711 Central Mechanical Supply & Installation of Submersible Pumping Machinery, Voltages Stabilizer , Chlorination system and internal House wiring for Tube well for Tube well no:- 1 & 2 at Birudiha water supply scheme under CMD PHE Dte, Dist: Paschim Bardhaman. ORD/000011/2023-2024 1657/CMD 06/04/2023 30 MAA TARA ENTERPRISE 21.19 20.56 100
1712 Central Mechanical Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-3 at Augmentation of Kanksa [Zone-II / C ] Water Supply Scheme under CMD, PHE Dte., Dist.- Paschim-Bardhaman ORD/000014/2022-2023 979/CMD 14/06/2022 30 ANANTA ELECTRICAL ENGINEERING CONSTRUCTION 8.94 8.67 0
1713 Central Mechanical Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-2 at Augmentation of Kanksa [Zone-II / C ] Water Supply Scheme under CMD, PHE Dte., Dist.- Paschim-Bardhaman ORD/000015/2022-2023 978/CMD 14/06/2022 30 ANANTA ELECTRICAL ENGINEERING CONSTRUCTION 8.94 8.61 0
1714 Central Mechanical Supply & Installation of Submersible Pumping Machinery , Voltage Stabilizer, Chlorination system and internal House wiring for Tube well no.- 2 at Augmentation of Gopalpur Water Scheme under CMD, PHE Dte., Dist.- Purba-Bardhaman. ORD/000016/2022-2023 911/CMD 31/05/2022 30 INDIA ENTERPRISE 9.16 8.95 0
1715 Central Mechanical Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-2 at Augmentation of Kanksa [Zone-II / D ] Water Supply Scheme under CMD, PHE Dte., Dist.- Paschim-Bardhaman ORD/000017/2022-2023 912/CMD 31/05/2022 30 DELTA ENGINEERING ENTERPRISE 9.88 9.72 0
1716 Central Mechanical Supply & Installation of Submersible Pumping Machinery , Voltage stabiliser , Chlorination Sistem and Internal House wiring for Tube well No. 3 at Bistupur Water Supply Scheme under CMD, PHE Dte., Dist.- Purba-Bardhaman. ORD/000018/2022-2023 913/CMD 31/05/2022 30 ASHUTOSH DAS & CO. 9.96 9.69 0
1717 Central Mechanical Supply & Installation of Submersible Pumping Machinery , Voltage Stabilizer, Chlorination system and internal House wiring for Tube well no.- 1 & 2 at Napara Water Supply Scheme under CMD, PHE Dte., Dist.- Paschim-Bardhaman. ORD/000057/2023-2024 2517/CMD 02/06/2023 30 SOUNAK ENTERPRISE 23.32 22.49 100
1718 Central Mechanical Supply & Installation of Submersible Pumping Machinery , Voltage Stabilizer, Chlorination system and internal House wiring for Tube well no.- 1 & 2 at Augmentation of Kanksa Zone - I Water Scheme under CMD, PHE Dte., Dist.- Paschim-Bardhaman. ORD/000070/2023-2024 2570/CMD 06/06/2023 30 MS DAS ELECTRIC CO 19.35 9.41 46
1719 Central Mechanical Supply & Installation of Submersible Pumping Machinery , Voltage Stabilizer, Chlorination system and internal House wiring for Tube well no.- 1, 2 & 3 at Augmentation of Kanksa Zone - II/A Water Scheme under CMD, PHE Dte., Dist.- Paschim-Bardhaman. ORD/000072/2023-2024 2571/CMD 06/06/2023 580 M/S. SWAPAN BANERJEE 29.92 9.58 31
1720 Central Mechanical Supply & Installation of Submersible Pumping Machinery , Voltage Stabilizer, Chlorination system and internal House wiring for Tube well no.- 1, 2 & 3 at Augmentation of Kanksa Zone - II/B Water Supply Scheme under CMD, PHE Dte., Dist.- Purba-Bardhaman. ORD/000076/2023-2024 2572/CMD 06/06/2023 30 JAL PRAVAHIKA PVT LTD 29.10 18.56 98
1721 Central Mechanical Supply & Installation of Submersible Pumping Machinery , Voltage Stabilizer, Chlorination system and internal House wiring for Tube well no.- 4 at Rupganj Water Scheme under CMD, PHE Dte., Dist.- Purba-Bardhaman. ORD/000154/2022-2023 1242/CMD 12/07/2022 30 AHALYA ENGINEERING WORKS 10.20 9.80 100
1722 Central Mechanical Supply & Installation of Submersible Pumping Machinery , Voltage Stabilizer, Chlorination system and internal House wiring for Tube well no.- 1 at Telipara Water Supply Scheme under CMD, PHE Dte., Dist.- Purba-Bardhaman. ORD/000155/2022-2023 3143/CMD 29/11/2022 30 M/S. SWAPAN BANERJEE 9.56 9.22 100
1723 Central Mechanical Supply & Installation of Submersible Pumping Machinery , Voltage Stabilizer, Chlorination system and internal House wiring for Tube well no.- 3 at Augmentation of Gopalpur Water Supply Scheme under CMD, PHE Dte., Dist.- Purba-Bardhaman. ORD/000158/2022-2023 1243/CMD 12/07/2022 30 GOENKA ENTERPRISE 10.21 10.09 0
1724 Central Mechanical Supply & Installation of Submersible Pumping Machinery , Voltage Stabilizer, Chlorination system and internal House wiring for Tube well no.- 3 at Rupganj Water Scheme under CMD, PHE Dte., Dist.- Purba-Bardhaman. ORD/000159/2022-2023 1244/CMD 12/07/2022 30 DEY ENTERPRISE 9.86 9.52 80
1725 Central Mechanical Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-3 at Augmentation of Kanksa [Zone-II / D ] Water Supply Scheme under CMD, PHE Dte., Dist.- Paschim -Bardhaman. ORD/000668/2022-2023 733/CMD 29/04/2022 30 CHATTERJEE ENTERPRISE 9.65 9.40 0
1726 Central Mechanical Supply & Installation of Submersible Pumping Machinery , Voltage stabilizer , Chlorinator and Internal House wiring for Tube well No. 1 of Bistupur Water Supply Scheme under CMD, PHE Dte., Dist.- Paschim Bardhaman. ORD/000724/2021-2022 478/CMD 28/03/2022 30 C.M. ENTERPRISE 9.74 9.56 0
1727 Central Mechanical Supply & Installation of Submersible Pumping Machinery , Voltage stabiliser , Chlorinator and Internal House wiring for Tube well No. 1 of Gopalpur Water Supply Scheme under CMD, PHE Dte., Dist.- Paschim Bardhaman. ORD/000725/2021-2022 477/CMD 28/03/2022 30 RNS TRADING 9.64 9.48 0
1728 Central Mechanical Supply & Installation of Submersible Pumping Machinery , Voltage Stabilizer, Chlorination system and internal House wiring for Tube well no.- 1 at Garkilla Khorobari Water Supply Scheme of Paschim Bardhaman under CMD, PHE Dte., Dist.- Purba-Bardhaman. ORD/000922/2022-2023 1222/CMD 16/03/2023 30 SOUVIK HALDER 10.21 8.74 70
1729 Central Mechanical Supply & Installation of Submersible Pumping Machinery , Voltage Stabilizer, Chlorination system and internal House wiring for Tube well no.- 1 at Banagram Water Supply Scheme under CMD, PHE Dte., Dist.- Paschim-Bardhaman. ORD/000932/2022-2023 1309/CMD 22/03/2023 30 K.S.P. ENTERPRISE 9.99 8.45 70
1730 Central Mechanical Supply & Delivery of Pump Motor Set at TW No: 01 of Garadaha water supply scheme under CMD, PHE, Dte. ORD/001164/2023-2024 112/DIC/BMSD(D) 04/10/2023 15 RAJIB COMPANY 0.52 0.52 100
1731 Central Mechanical Supply & Delivery of Pump Motor Set at TW No: 01 of Banagram water supply scheme under CMD, PHE, Dte. ORD/001165/2023-2024 111/DIC/BMSD(D) 04/10/2023 15 K.S.P. ENTERPRISE 0.52 0.00 100
1732 Central Mechanical Supply & Delivery of Pump Motor Set at TW No: 01 of Garkilla Khorobari water supply scheme under CMD, PHE, ORD/001166/2023-2024 110/DIC/BMSD(D) 04/10/2023 15 SOUVIK HALDER 0.52 0.52 100
1733 Central Mechanical Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination system and internal House wiring for tube well No. - 3 at Kanchanpur Water Supply Scheme of (Kanksa Block, Paschim-Bardhaman) ORD/001269/2023-2024 17/CMD 03/01/2024 30 S.P. CONSTRUCTION 12.36 0.00 100
1734 Central Mechanical Supply & laying of cable for actuator of Tube well No ¿ 2 at Augmentation of Kanksa Zone -II/B water supply scheme under Central Mechanical Division PHE, Dte. ORD/001756/2023-2024 130/DIC/BMSD(D) 29/02/2024 7 JAL PRAVAHIKA PVT LTD 0.86 0.86 100
1735 Central Mechanical Supply & Installation of Kiosk box and other allied work for Tube well No: 2 & 3 at Augmentation of Kanksa Zone -II/B water supply scheme under Central Mechanical Division PHE, Dte. ORD/001757/2023-2024 131/DIC/BMSD(D) 29/02/2024 15 JAL PRAVAHIKA PVT LTD 0.58 0.58 100
1736 Asansol Mechanical Installation Charge and Security Deposit for Bulk Power Supply at Intake Sub-Station Sarkuri Salanpur Under Augmentation of RCFA Part-II BILL/00003/2024-2025 BP-2024-25-2 15/04/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED 54.89 0.00 0
1737 Asansol Mechanical New Power Connection at Damalia Pumping Station. BILL/00021/2023-2024 BP-2023-24-12 19/05/2023 0 INDIA POWER CORPN. LTD. 24.34 0.00 0
1738 Asansol Mechanical Quotation for New Connection at Churulia. BILL/00022/2023-2024 BP-2023-24-6 19/05/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED 5.94 0.00 0
1739 Asansol Mechanical DIVERSION OF 33KV S/C PHE FEEDER INSIDE THE PREMISES OF THE PHE DUE TO PROPOSED WTP,KALYNESWARI FOR M/S PHE DIRECTORATE,ASANSOL BILL/00022/2024-2025 BP-2024-25-4 23/04/2024 0 CHIEF ACCOUNTS OFFICER, DAMODAR VALLEY CORPORATION 2.80 0.00 0
1740 Asansol Mechanical Quotation Money for Load Enhancement at Andal BILL/00023/2023-2024 BP-2023-24-5 19/05/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED 11.28 0.00 0
1741 Asansol Mechanical QUOTATION MONEY FOR NEW CONNECTION AT KANTABERIA. BILL/00024/2023-2024 BP-2023-24-3 19/05/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED 5.30 0.00 0
1742 Asansol Mechanical Deposition of earnest money for the proposed enhancement of the load at your premises at Dalurbandh, Pandabeswar BILL/00024/2024-2025 BP-2024-25-7 24/04/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED 0.05 0.00 0
1743 Asansol Mechanical QUOTATION MONEY FOR NEW CONNECTION AT KHATGORIA BILL/00025/2023-2024 BP-2023-24-4 19/05/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED 2.39 0.00 0
1744 Asansol Mechanical Quotation Payment for Basudha T/W No-3, under Kanksa Block, Paschim Bardhaman as per WBSEDCL Procedure-A(2010) on Turn-Key/Full Deposit Basis. BILL/00025/2024-2025 BP-2024-25-6 24/04/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED 2.70 0.00 0
1745 Asansol Mechanical QUOTATION MONEY FOR NEW CONNECTION AT PANURIA BILL/00026/2023-2024 BP-2023-24-7 19/05/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED 6.17 0.00 0
1746 Asansol Mechanical Quotation Money for Enhanacement of Load at Dendua. BILL/00027/2023-2024 BP-2023-24-9 19/05/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED 5.88 0.00 0
1747 Asansol Mechanical Quotation Money for New Connection of Load at Tabadi (Adibasi Para) BILL/00028/2023-2024 BP-2023-24-9 19/05/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED 0.34 0.00 0
1748 Asansol Mechanical Quotation Money for New Connection of Load at Dhonudi. BILL/00029/2023-2024 BP-2023-24-10 19/05/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED 0.34 0.00 0
1749 Asansol Mechanical Quotation Money for New Connection of Load at Lalganj BILL/00030/2023-2024 BP-2023-24-11 19/05/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED 0.48 0.00 0
1750 Asansol Mechanical Quotation Payment for Trilockchandrapur T/W No-3, under Kanksa Block, Paschim Bardhaman as per WBSEDCL Procedure-A(2010) on Turn-Key/Full Deposit Basis. BILL/00038/2024-2025 BP-2024-25-11 06/05/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED 7.79 0.00 0
1751 Asansol Mechanical Shifting of overhead line inside the premises of benali boosting station BILL/00075/2024-2025 BP-2024-25-14 17/05/2024 0 INDIA POWER CORPN. LTD. 2.84 0.00 0
1752 Asansol Mechanical Quotation as per WBSEDCL Procedure-A (2010) ON Turn key/ Full deposit basis for the site of Trilockchandrapur Pump House no-4, Trilockchandrapur under Kanksa Block under Panagarh CCC supply office. BILL/00076/2024-2025 BP-2024-25-12 17/05/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED 9.48 0.00 0
1753 Asansol Mechanical Quotation as per WBSEDCL Procedure-A (2010) ON Turn key/ Full deposit basis for the site of Napara Sukhna Pump House no-4, under Kanksa Block under Panagarh CCC supply office BILL/00077/2024-2025 BP-2024-25-13 17/05/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED 3.77 0.00 0
1754 Asansol Mechanical Quotation Money for New Connection at Kajora BILL/00079/2023-2024 BP-2023-24-16 23/06/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED 7.31 0.00 0
1755 Asansol Mechanical Quotation money for New Connection at Darbardanga BILL/00080/2023-2024 BP-2023-24-17 05/07/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED 5.48 0.00 0
1756 Asansol Mechanical Bulk power supply at 33kv to premises PHE DTE ,kalyaneswari WTP ,JL-01,plot-313,KALYANESWARI wtp area,paschim burdwan-713369 for an ultimate contract demand 2246kva BILL/00130/2024-2025 BP-2024-25-19 13/06/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED 103.61 0.00 0
1757 Asansol Mechanical Quotation for new connection at Natundanga OHR under RCFA Part-III(Zone-II) water supply scheme. BILL/00131/2024-2025 BP-2024-25-20 13/06/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED 0.09 0.00 0
1758 Asansol Mechanical Deposition of the Earnest Money for the proposed enhancement of the load at Ramprasadpur Andal BDN BILL/00169/2022-2023 BP-2022-23-27 31/01/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED 0.05 0.00 0
1759 Asansol Mechanical New Connection at Jamgram Water Supply Scheme. BILL/00170/2022-2023 BP-2022-23-28 31/01/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED 2.68 0.00 0
1760 Asansol Mechanical New Connection Charge at Bagdiha Water Supply Scheme BILL/00171/2022-2023 BP-2022-23-29 31/01/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED 7.15 0.00 0
1761 Asansol Mechanical Quotation for enhancement of load at 11 KV from 200 KVA to 305 KVA to your premises at Ramprasadpur,Andal, Paschim Burdwan. BILL/00223/2022-2023 23/02/2023 0 W.B.S.E.D.C.L 11.28 0.00 0
1762 Asansol Mechanical Fuel Charges for the Cab of EE under AMD, PHE Dte. for the month of NOV, 2023. BILL/00303/2024-2025 BP-2024-25-27/4 30/07/2024 0 RANAJIT AUTO 0.09 0.00 0
1763 Asansol Mechanical Fuel Charges for the Cab of EE under AMD, PHE Dte. for the month of DECEMBER, 2023. BILL/00305/2024-2025 BP-2024-25-27/5 30/07/2024 0 RANAJIT AUTO 0.23 0.00 0
1764 Asansol Mechanical Deposit for Earnest Money Application BILL/00307/2023-2024 BP-2023-24-22 25/07/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED 0.05 0.00 0
1765 Asansol Mechanical Fuel Charges for the Cab of AE-I under AMD, PHE Dte. for the month of NOVEMBER, 2023 BILL/00307/2024-2025 BP-2024-25-27/2 30/07/2024 0 RANAJIT AUTO 0.22 0.00 0
1766 Asansol Mechanical Fuel Charges for the Cab of AE-I under AMD, PHE Dte. for the month of JANUARY, 2024 BILL/00310/2024-2025 BP-2024-25-30 06/08/2024 0 RANAJIT AUTO 0.26 0.00 0
1767 Asansol Mechanical Fuel Charges for the Cab of AE-I under AMD, PHE Dte. for the month of FEBRUARY, 2024. BILL/00312/2024-2025 BP-2024-25-30/1 06/08/2024 0 RANAJIT AUTO 0.27 0.00 0
1768 Asansol Mechanical Fuel Charges for the Cab of AE-II under AMD, PHE Dte. for the month of NOVEMBER, 2023. BILL/00313/2024-2025 BP-2024-25-27 30/07/2024 0 RANAJIT AUTO 0.20 0.00 0
1769 Asansol Mechanical Fuel Charges for the Cab of AE-II under AMD, PHE Dte. for the month of DECEMBER, 2023 BILL/00315/2024-2025 BP-2024-25-27/1 30/07/2024 0 RANAJIT AUTO 0.24 0.00 0
1770 Asansol Mechanical Fuel Charges for the Cab of AE-II under AMD, PHE Dte. for the month of JANUARY, 2024 BILL/00317/2024-2025 BP-2024-25-30/2 06/08/2024 0 RANAJIT AUTO 0.25 0.00 0
1771 Asansol Mechanical Fuel Charges for the Cab of AE-II under AMD, PHE Dte. for the month of FEBRUARY, 2024 BILL/00319/2024-2025 BP-2024-25-30/3 06/08/2024 0 RANAJIT AUTO 0.23 0.00 0
1772 Asansol Mechanical Fuel Charges for the Cab of AE - I under AMD, PHE Dte. for the month of DECEMBER, 2023 BILL/00320/2024-2025 BP-2024-25-27/3 30/07/2024 0 RANAJIT AUTO 0.26 0.00 0
1773 Asansol Mechanical Payment of Security Deposite & Remaining Earnest Money for Bansra Boosting Station (Consumer ID- 950085633) under Asansol Mechanical Division, P.H.E. Dte. BILL/00398/2024-2025 BP-2024-25-24 29/07/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED 24.84 0.00 0
1774 Asansol Mechanical Quotation for Earnest money deposit for Bulk Power Supply at Ethora boosting Station Under Improvement of RCFA Part I WS Scheme. BILL/00452/2023-2024 BP-2023-24-31 13/09/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED 0.05 0.00 0
1775 Asansol Mechanical Quotation for enhancement of load at Basudebpur under Augmentation of Andal. BILL/00453/2023-2024 BP-2023-24-33 14/09/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED 0.32 0.00 0
1776 Asansol Mechanical Fuel Bill for Diesel Driven Maxi Cab for Official Use of The AE-II, under AMD, PHE Dte for the month of March, 2024. BILL/00459/2024-2025 BP-2024-25-33/1 23/08/2024 0 RANAJIT AUTO 0.23 0.00 0
1777 Asansol Mechanical Fuel Bill for Diesel Driven Maxi Cab for Official Use of The AE-II, under AMD, PHE Dte for the month of April, 2024. BILL/00461/2024-2025 BP-2024-25-33/3 23/08/2024 0 RANAJIT AUTO 0.15 0.00 0
1778 Asansol Mechanical Fuel Bill for Diesel Driven Maxi Cab for Official Use of The AE-I, under AMD, PHE Dte for the month of March, 2024. BILL/00463/2024-2025 BP-2024-25-33/5 23/08/2024 0 RANAJIT AUTO 0.25 0.00 0
1779 Asansol Mechanical Fuel Bill for Diesel Driven Maxi Cab for Official Use of The AE-I, under AMD, PHE Dte for the month of April, 2024. BILL/00465/2024-2025 BP-2024-25-33/7 23/08/2024 0 RANAJIT AUTO 0.22 0.00 0
1780 Asansol Mechanical Fuel Bill for the Cab of The Executive Engineer, under AMD, PHE Dte., for the month of Jan, 2024. BILL/00467/2024-2025 BP-2024-25-34/1 23/08/2024 0 RANAJIT AUTO 0.25 0.00 0
1781 Asansol Mechanical Fuel Bill for the Cab of The Executive Engineer, under AMD, PHE Dte., for the month of Feb, 2024. BILL/00469/2024-2025 BP-2024-25-34/3 23/08/2024 0 RANAJIT AUTO 0.22 0.00 0
1782 Asansol Mechanical Fuel Bill for the Cab of The Executive Engineer, under AMD, PHE Dte., for the month of March,2024. BILL/00471/2024-2025 BP-2024-25-34/5 23/08/2024 0 RANAJIT AUTO 0.25 0.00 0
1783 Asansol Mechanical Fuel Bill for the Cab of The Executive Engineer, under AMD, PHE Dte., for the month of April, 2024. BILL/00473/2024-2025 BP-2024-25-62 28/10/2024 0 RANAJIT AUTO 0.22 0.00 0
1784 Asansol Mechanical Quotation for natundanga O.H.R. under RCFA-III(Zone-I) Water supply scheme. BILL/00481/2024-2025 BP-2024-25-43 05/09/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED 0.09 0.00 0
1785 Asansol Mechanical Quotation Money for new connection under Sharpi Water Supply Scheme. BILL/00534/2023-2024 BP-2023-24-45 03/11/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED 5.03 0.00 0
1786 Asansol Mechanical Quotation Money for New Connection under Sharpi Water Supply Scheme. BILL/00535/2023-2024 BP-2023-24-44 03/11/2023 0 WEST BENGAL ENGINEERING CO. 3.65 0.00 0
1787 Asansol Mechanical Meter Shifting Charge of Ethora Water tank under Improvement of RCFA (Part-I) Piped Water Supply Scheme BILL/00564/2023-2024 BP-2023-24-53 29/11/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED 0.02 0.00 0
1788 Asansol Mechanical Load Enhancement for Natundanga Zone under Sharpi PWSS BILL/00574/2024-2025 BP-2024-25-59 26/09/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED 21.33 0.00 0
1789 Asansol Mechanical Quotation as per WBSEDCL Procedure-A (2010) for the site of Bamunara TW No.-03, Rajbandh Uttarpara. BILL/00586/2024-2025 BP-2024-25-66 28/10/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED 3.91 0.00 0
1790 Asansol Mechanical PAYMENT OF SECURITY DEPOSIT & EARNEST MONEY FOR BULK POWER SUPPLY AT SHANKARPUR BOOSTING STATION. BILL/00589/2024-2025 BP-2024-25-63 28/10/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED 22.90 0.00 0
1791 Asansol Mechanical Shifting of High Tension Line and Street Light from the Proposed WTP plant area in Kalyaneswari Campus under Improvement of RCFA I Water Supply Scheme BILL/00682/2023-2024 BP-2023-24-59 26/12/2023 0 CHIEF ACCOUNTS OFFICER, DAMODAR VALLEY CORPORATION 0.24 0.00 0
1792 Asansol Mechanical Quotation for Earnest Money Deposit at Bansra Boosting Station, Kunustoria under Augmentation of RCFA II WS Scheme. BILL/00692/2023-2024 BP-2023-24-61 28/12/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED 0.05 0.00 0
1793 Asansol Mechanical Quotation for Earnest Money Deposit at Searsole Boosting Station, Ranisayer under Augmentation of RCFA II WS Scheme. BILL/00693/2023-2024 BP-2023-24-62 28/12/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED 0.05 0.00 0
1794 Asansol Mechanical Quotation for Earnest Money Deposit at Sankarpur Boosting Station, Chhora under Augmentation of RCFA II WS Scheme. BILL/00694/2023-2024 BP-2023-24-63 28/12/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED 0.05 0.00 0
1795 Asansol Mechanical Earnest Money Deposit for Bulk Power Supply at Mohishila Boosting Station under Augmentation of RCFA Part II WS Scheme. BILL/00696/2023-2024 BP-2023-24-65 02/01/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED 0.05 0.00 0
1796 Asansol Mechanical Earnest Money Deposit for Bulk Power Supply at Intake sub-station Sarkuri Salanpur under Augmentation of RCFA Part II WS Scheme. BILL/00697/2023-2024 BP-2023-24-66 02/01/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED 0.05 0.00 0
1797 Asansol Mechanical Quotation Money for Earnest Money Deposition for Bulk Power supply at Kalyaneswari under Augmentation of RCFA Part II WS Scheme. BILL/00777/2023-2024 BP-2023-24-69 11/01/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED 0.20 0.00 0
1798 Asansol Mechanical Service connection and Security Deposit charge at Ethora Boosting Station under Improvement of RCFA Part-I W/S Scheme. BILL/00778/2023-2024 BP-2023-24-67 11/01/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED 25.69 0.00 0
1799 Asansol Mechanical Quotation payment as per WBSEDCL Procedure-A (2010) for Pump House No 5, under Augmentation of Bamunara Water Supply Scheme, near Rajbadh Choti, Block- Kanksa, Paschim Bardhaman. BILL/00834/2024-2025 BP-2024-25-71 03/12/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED 3.75 0.00 0
1800 Asansol Mechanical Quotation payment as per WBSEDCL Procedure-A (2010) for Pump House No 3, under Augmentation of Birudiha Water Supply Scheme, Block- Kanksa, Paschim Bardhaman. BILL/00835/2024-2025 BP-2024-25-72 03/12/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED 2.94 0.00 0
1801 Asansol Mechanical Quotation payment as per WBSEDCL Procedure-A (2010) for Pump House No 5, under Augmentation of Birudiha Water Supply Scheme, Block- Kanksa, Paschim Bardhaman. BILL/00836/2024-2025 BP-2024-25-73 03/12/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED 2.76 0.00 0
1802 Asansol Mechanical New Connection at Kantabeira RBTW BILL/00840/2024-2025 BP-2024-25-74 09/12/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED 4.37 0.00 0
1803 Asansol Mechanical Bulk Power Supply at Searsole Boosting Station under Augmentation of RCFA Part II. BILL/00911/2023-2024 BP-2023-24-76 21/02/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED 93.38 0.00 0
1804 Asansol Mechanical Bulk Power Supply at Mohishila Boosting Station under Augmentation of RCFA Part II. BILL/00912/2023-2024 BP-2023-24-77 21/02/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED 22.75 0.00 0
1805 Asansol Mechanical Service Connection Charge at Kantaberia. BILL/00939/2023-2024 BP-2023-24-84 14/03/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED 4.28 0.00 0
1806 Asansol Mechanical Service Connection Charge at Khatagoria under Katabera. BILL/00940/2023-2024 BP-2023-24-85 14/03/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED 3.75 0.00 0
1807 Asansol Mechanical Providing and Installation of Sub-Station Equipments and other accessories at Amritnagar Zone-II Water Supply Scheme within RCFA Part-II area, Block : Raniganj, Dist -Paschim Bardhaman. ORD/000001/2023-2024 872/AMD 04/04/2023 366 EASTERN INDIA SALES AND SERVICE 166.24 121.25 100
1808 Asansol Mechanical Providing and Installation of Pumping Machineries, PDB CUM MCC Panel, Substation Equipments and other Accessories at Head Works Site at Pansuli under RCFA-III(Zone-I) Water Supply Scheme, Block: Faridpur-Durgapur, Dist. Paschim Bardhaman. ORD/000002/2023-2024 873/AMD 04/04/2023 366 INDUSTRIAL ELECTRICAL CORPORATION 137.21 136.29 73
1809 Asansol Mechanical Supply delivery and installation of submersible pumping machinery in the newly sunk ground bored tubewell, lighting arrangement at new Bhaburia headworks site and corresponding sharpi O.H.R under RBTW water based water supply scheme for sharpi and adjoining areas under Asansol Mechanical Division, PHE Dte. ORD/000023/2025-2026 943/AMD 16/05/2025 30 M/S JIT ENTERPRISE 14.96 0.00 0
1810 Asansol Mechanical Supply & Installation of submersible pumping machineries at Newly sunk 8 Nos Low Lift RBTWs at Madanpur Lowlift under Source Augmentation of RCFA Part-II Water Supply Scheme. ORD/000024/2025-2026 944/AMD 16/05/2025 30 BENGAL CONSTRUCTION 24.61 0.00 0
1811 Asansol Mechanical Providing & fitting, fixing of lighting luminaries of pump house with yard lighting arrangement and other allied works at Basudha Pump House No-03 (OHR Site) under Augmentation of Basudha Water Supply Scheme, Block-Kanksa, Dist.- Paschim Bardhaman under Asansol Mechanical Division, P.H.E. Dte. ORD/000026/2025-2026 946/AMD 16/05/2025 30 CIEMENICS 4.40 0.00 0
1812 Asansol Mechanical Additional Electrical and illumination works and installation of 1 Ton Capacity mono rail at Dendua Boosting Station Pump House, under Improvement of RCFA (Part-I) Piped Water Supply Scheme. ORD/000028/2025-2026 948/AMD 16/05/2025 30 EASTERN INDIA SALES AND SERVICE 7.91 0.00 0
1813 Asansol Mechanical SUPPLY AND INSTALLATION OF SUBMERSIBLE PUMPING MACHINERY, VOLTAGE STABILIZER, CHLORINATION SYSTEM AND INTERNAL HOUSE WIRING FOR TUBE WELL NO-7 (MALANDIGHI) & TUBE WELL NO-8 (RAKSHITPUR) AT AUGMENTATION OF BISTUPUR PIPED WATER SUPPLY SCHEME UNDER ASANSOL MECHANICAL DIVISION, PHE DTE., BLOCK- KANKSA, DIST- PASCHIM BARDHAMAN. ORD/000031/2025-2026 951/AMD 16/05/2025 30 M/S SAJAHAN CHOWDHURY 23.47 0.00 0
1814 Asansol Mechanical Supply & Installation Of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System And Internal House Wiring For Tube Well No-3 At Augmentation Of Ground water based water supply scheme for Shyambazar Under Asansol Mechanical Division, Phe Dte., Block- Kanksa, Dist- Paschim Bardhaman. ORD/000032/2025-2026 952/AMD 16/05/2025 30 PESTCO INDIA 11.61 0.00 0
1815 Asansol Mechanical Withdrawing and lowering of Submersible pumping machineries at RBTW No-9 & 14 with Other allied works at Pansuli Head Works Site under RCFA Part-III(Zone-I) Water Supply Scheme. ORD/000034/2024-2025 1036/AMD 16/07/2024 30 CIEMENICS 4.05 4.00 100
1816 Asansol Mechanical Installation of yard lighting arrangement, electrical wiring of chlorine room with lighting luminaries of Tabadi O.H.R. premises under Improvement of RCFA Part-I W/S Scheme. ORD/000034/2025-2026 954/AMD 16/05/2025 202 P.K.ENGINEERING 4.23 0.00 100
1817 Asansol Mechanical Lowering of submersible pumping machineries in Newly sunk RBTW No-5 at Tirat Colliery Lowlift Pump House under Tirat Colliery Water Supply Scheme. ORD/000035/2024-2025 1037/AMD 16/07/2024 45 PESTCO INDIA 8.93 8.87 100
1818 Asansol Mechanical Installation of yard lighting arrangement, electrical wiring of pump house and other allied works at Churulia Pump House under Augmentation of Churulia Piped Water Supply Scheme. ORD/000036/2025-2026 955/AMD 16/05/2025 30 CIEMENICS 3.67 0.00 100
1819 Asansol Mechanical Installation of yard lighting arrangement, electrical wiring of chlorine room of Lalganj O.H.R.(Zone-IX & XI) premises under Improvement of RCFA Part-I W/S Scheme. ORD/000037/2025-2026 956/AMD 16/05/2025 202 P.K.ENGINEERING 7.92 0.00 100
1820 Asansol Mechanical Lowering of Submersible Pumping Machineries for Newly Sunk RBTW No-03 for CWR at Ajoy Ghat Pumping Station under Churulia Water Supply Scheme. ORD/000038/2024-2025 1040/AMD 16/07/2024 511 PREMNATH MITRA 10.27 0.00 100
1821 Asansol Mechanical Supply, delivery & installation of Submersible Pumping Machineries, Voltage Stabilizer, Chlorination System and internal House wiring for Tube Well No-I,II and III under Tetikhola Piped Water Supply Scheme, Block- Faridpur-Durgapur, District-Paschim Bardhaman. ORD/000039/2023-2024 1022/AMD 19/04/2023 90 M/S SWAPAN BANERJEE 34.29 0.00 0
1822 Asansol Mechanical Providing & Installation of Low Lift Pumping Machineries at newly sunk Tube Wells at Kharabar river bed under Sarshatali Piped Water Supply scheme, Block : Baraboni, Dist : Paschim Bardhaman. ORD/000041/2023-2024 1024/AMD 19/04/2023 90 M/S. SOMA ENTERPRISE 13.70 13.68 100
1823 Asansol Mechanical Supply & Erection of 33 KV, S/C, Electrical Equipments & accessories related to the diversion of 33KV transmission line at Kalyaneswari W.T.P under Asansol Mechanical Division. P.H.E. Dte. ORD/000043/2024-2025 1087/AMD 25/07/2024 160 OHMS ELECTRICAL AND CO 23.95 16.82 80
1824 Asansol Mechanical Lowering of submersible pumping machineries in Newly sunk RBTW No-7 at Tirat Colliery Lowlift Pump House under Tirat Colliery Water Supply Scheme. ORD/000047/2024-2025 1133/AMD 30/07/2024 60 PESTCO INDIA 8.93 8.87 100
1825 Asansol Mechanical Lowering of Submersible Pumping Machineries in the Newly sunk RBTWs Harvanga-13 & 14 to Tirat Mouza Pump House under Tirat Mouza Water Supply Scheme. ORD/000048/2024-2025 1134/AMD 30/07/2024 60 M/S. SOMA ENTERPRISE 8.55 6.95 100
1826 Asansol Mechanical Providing and Installation of Submersible Pumping machineries in the Newly sunk RBTWs no-13 at Surjanagar Low lift Pump House under ASTA W/S Scheme. ORD/000049/2024-2025 1135/AMD 30/07/2024 60 M/S S.G.ENTERPRISE 9.75 0.00 0
1827 Asansol Mechanical Providing and installation of Gaseous chlorination system at Malladi OHR Site under Augmentation of RCFA Part-I Water Supply Scheme. ORD/000056/2025-2026 992/AMD 23/05/2025 30 P.K.ENGINEERING 28.70 0.00 0
1828 Asansol Mechanical Installation of transformer(315 KVA), Supply, delivery and installation S/M, Pump-Motor set, and other allied works at Madanpur Head Works Site under RCFA Part-II Water Supply Scheme. ORD/000069/2025-2026 1108/AMD 16/06/2025 30 M/S SAJAHAN CHOWDHURY 37.68 0.00 0
1829 Asansol Mechanical Providing and Installation of Submersible Pumping machineries in the Newly sunk RBTWs from 07-11 at Surjanagar Low lift Pump House under ASTA W/S Scheme. ORD/000070/2024-2025 1201/AMD 07/08/2024 45 M/S JIT ENTERPRISE 8.85 8.83 100
1830 Asansol Mechanical Lowering of submersible pumping machineries in Newly sunk RBTW No-6 at Tirat Colliery Low lift Pump House under Tirat Colliery Water Supply Scheme. ORD/000071/2024-2025 1202/AMD 07/08/2024 45 PESTCO INDIA 4.97 4.92 100
1831 Asansol Mechanical Providing & Installation of Centrifugal Pumping Machineries(No-04) at Amdahi Boosting Station under Augmentation of Sharpi Water Supply Scheme. ORD/000071/2025-2026 1110/AMD 16/06/2025 30 WEST BENGAL ENGINEERING CO. 32.17 0.00 0
1832 Asansol Mechanical Additional works Corresponding to ''Supply, delivery & installation of Electro-Mechanical equipment and other allied works at Kajora Piped Water Supply Scheme under Asansol Mechanical Division, P.H.E Dte. Block-Andal, District-Paschim Bardhaman'' ORD/000072/2025-2026 1111/AMD 16/06/2025 30 ORIENTAL ENGINEERING CO. 17.15 0.00 100
1833 Asansol Mechanical Providing & fitting, fixing of lighting luminaries, electrical wiring of pump house with yard lighting arrangement and other allied works at New Damalia Pump House under Amritnagar Zone-I, within RCFA Part-II Area Water Supply Scheme. ORD/000073/2024-2025 1204/AMD 07/08/2024 45 M/S JIT ENTERPRISE 4.09 3.95 100
1834 Asansol Mechanical Providing and installation of vertical Pumping Machineries under Sarisathali Water Supply Scheme. ORD/000073/2025-2026 1112/AMD 16/06/2025 30 M/S. SOMA ENTERPRISE 11.05 0.00 0
1835 Asansol Mechanical Allied Works Corresponding to "Providing and Installation of Sub-Station Equipments and other accessories at Amritnagar Zone-II Water Supply Scheme within RCFA Part-II area, Block : Raniganj, Dist -Paschim Bardhaman. ORD/000074/2024-2025 1205/AMD 07/08/2024 45 EASTERN INDIA SALES AND SERVICE 12.75 0.00 100
1836 Asansol Mechanical Continuation order for Hiring of Diesel driven Maxi cabs for official use of the Assistant Engineer-I under Asansol Mechanical Division, P.H Engineering. Dte. ORD/000087/2023-2024 1091/AMD 25/04/2023 365 EASTERN INDIA SALES AND SERVICE 1.79 1.75 83
1837 Asansol Mechanical Continuation order for Hiring of Diesel driven Maxi cabs for official use of the Assistant Engineer-II under Asansol Mechanical Division, P.H Engineering. Dte. ORD/000088/2023-2024 1092/AMD 25/04/2023 365 EASTERN INDIA SALES AND SERVICE 1.79 1.75 83
1838 Asansol Mechanical Continuation order for Hiring of Diesel driven Maxi cabs for official use of the Executive Engineer under Asansol Mechanical Division, P.H Engineering. Dte. ORD/000089/2023-2024 1099/AMD 26/04/2023 365 SUNRISE ENGINEERING CORPORATION 1.79 1.80 67
1839 Asansol Mechanical Providing & fitting, fixing of lighting luminaries, electrical wiring of pump house with yard lighting arrangement and other allied works at Gourbazar Pump House under Augmentation of Jamgram Piped Water Supply Scheme. ORD/000134/2024-2025 1319/AMD 21/08/2024 45 INDUSTRIAL ELECTRICAL CORPORATION 2.79 0.00 100
1840 Asansol Mechanical Supply,delivery & installation of Electro-Mechanical equipment and other allied works at New Bhaburia Head Works Site and Madhaiganj Boosting Station under Sharpi Piped Water Supply Scheme under Asansol Mechanical Division,P.H.E Dte. Block-Durgapur-Faridpur, District-Paschim Bardhaman. ORD/000178/2023-2024 1402/AMD 19/07/2023 366 MACHINE SUPPLIERS SYNDICATE(P) LTD. 338.11 202.91 60
1841 Asansol Mechanical Providing & Installation of Electrical Equipments For Sub-Station at Mohishila Boosting Station (GLR-I & II), Searsole Boosting Station (GLR-I & II), Sankarpur Clear Water Boosting Station and Banshra Clear Water Boosting Station and Gaseous Chlorination system at different OHR sites with illumination under Augmentation of RCFA Part-II Piped Water Supply Scheme. ORD/000203/2023-2024 1492/AMD 04/08/2023 366 ORIENTAL ENGINEERING CO. 1,965.22 1,393.70 71
1842 Asansol Mechanical SUPPLY & INSTALLATION OF SUBMERSIBLE PUMPING MACHINERY, VOLTAGE STABILIZER, CHLORINATION SYSTEM AND INTERNAL HOUSE WIRING FOR TUBE WELL NO-05 AND OTHER ALLIED WORKS FOR T/W-01 AT KANTABERIA PIPED WATER SUPPLY SCHEME UNDER ASSANSOL MECHANICAL DIVISION, PHE DTE.,BLOCK-DURGAPUR-FARIDPUR, DIST.- PASCHIM-BARDHAMAN ORD/000278/2024-2025 1680/AMD 04/10/2024 157 M/S SWAPAN BANERJEE 18.46 0.00 90
1843 Asansol Mechanical Providing of lighting luminaries, electrical wiring of chlorine room with yard lighting arrangement of Kantaberia O.H.R. premises under Katabera W/S Scheme. ORD/000280/2024-2025 1673/AMD 04/10/2024 30 SARVATAH PROJECTS PRIVATE LIMITED 6.28 0.00 0
1844 Asansol Mechanical Providing & fitting, fixing of lighting luminaries of pump house with yard lighting arrangement and other allied work at Pump House No- 01 under Shymbazar Water Supply Scheme, Block-Kanksa, Dist- Paschim Bardhaman under Asansol Mechanical Division,P.H.E Dte. ORD/000282/2024-2025 1676/AMD 04/10/2024 30 M/S JIT ENTERPRISE 4.11 0.00 100
1845 Asansol Mechanical Providing & Installation of Electrical Equipments For Sub-Station at Intake and Water Treatment Plant under Augmentation of RCFA Part-II Piped Water Supply Scheme. ORD/000312/2023-2024 1687/AMD 07/09/2023 366 WEST BENGAL ENGINEERING CO. 1,704.70 1,206.59 70
1846 Asansol Mechanical Providing & fitting, fixing of lighting luminaries of pump house with yard lighting arrangement and other allied works at Pump House No-01 under Kanksa Zone-II/C (Madhabmath) Water Supply Scheme, Block- Kanksa, Dist.- Paschim Bardhaman under Asansol Mechanical Division, P.H.E. Dte. ORD/000313/2024-2025 1808/AMD 29/10/2024 30 SUDIKSHA CONSTRUCTION 2.96 0.00 0
1847 Asansol Mechanical Providing & fitting, fixing of lighting luminaries of pump house with yard lighting arrangement and other allied works at Pump House No-01 under Augmentation of Kanksa Zone-I Water Supply Scheme, Block- Kanksa, Dist.- Paschim Bardhaman under Asansol Mechanical Division, P.H.E. Dte. ORD/000315/2024-2025 1809/AMD 29/10/2024 30 M/S A.D.ENTERPRISE 2.97 0.00 0
1848 Asansol Mechanical Lowering of Submersible Pumping Machineries in Newly sunk RBTW No-6 & 7 for CWR at Roshna Pump House under Roshna Water Supply Scheme. ORD/000317/2024-2025 1811/AMD 29/10/2024 30 M/S SAJAHAN CHOWDHURY 12.12 0.00 0
1849 Asansol Mechanical SUPPLY, DELIVERY AND INSTALLATION OF SUBMERSIBLE PUMPING MACHINERY, VOLTAGE STABILIZER, CHLORINATION SYSTEM AND YARD LIGHTING INTERNAL HOUSE WIRING FOR TUBE WELL NO-3 & TUBE WELL NO-4 AT AUGMENTATION OF TILAKCHANDRAPUR PIPED WATER SUPPLY SCHEME UNDER ASANSOL MECHANICAL DIVISION, PHE DTE. ORD/000322/2024-2025 1820/AMD 29/10/2024 115 ELECTRICAL & MECHANICAL ENGINEERING CORPORATION 26.65 0.00 93
1850 Asansol Mechanical SUPPLY, DELIVERY AND INSTALLATION OF SUBMERSIBLE PUMPING MACHINERY, VOLTAGE STABILIZER, CHLORINATION SYSTEM AND INTERNAL HOUSE WIRING FOR TUBE WELL NO-3 (Rajmath Uttarpara), TUBE WELL NO-4 (Banskopa) , and TUBE WELL NO-5 (Rajbandh) AT BAMUNARA PIPED WATER SUPPLY SCHEME UNDER ASANSOL MECHANICAL DIVISION, PHE DTE. ORD/000324/2024-2025 1817/AMD 29/10/2024 30 M/S SAJAHAN CHOWDHURY 34.88 0.00 0
1851 Asansol Mechanical SUPPLY, DELIVERY AND INSTALLATIONOF SUBMERSIBLE PUMPING MACHINERY, VOLTAGE STABILIZER, CHLORINATION SYSTEM AND INTERNAL HOUSE WIRING FOR TUBE WELL NO-3 AT AUGMENTATION OF BASUDHA PIPED WATER SUPPLY SCHEME UNDER ASANSOL MECHANICAL DIVISION, PHE DTE. ORD/000325/2024-2025 1818/AMD 29/10/2024 30 M/S A.D.ENTERPRISE 11.61 0.00 0
1852 Asansol Mechanical SUPPLY, DELIVERY AND INSTALLATION OF SUBMERSIBLE PUMPING MACHINERY, VOLTAGE STABILIZER, CHLORINATION SYSTEM AND INTERNAL HOUSE WIRING FOR TUBE WELL NO-3 (Hat tola) & TUBE WELL NO-4 (H/W Site) AT AUGMENTATION OF BIRUDIHA PIPED WATER SUPPLY SCHEME UNDER ASANSOL MECHANICAL DIVISION, PHE DTE. ORD/000326/2024-2025 1819/AMD 29/10/2024 30 SUNRISE ENGINEERING CORPORATION 22.13 0.00 0
1853 Asansol Mechanical Supply and delivery of Ferric Alum at Kajora Pump House for Raw water treatment under Kajora Water Supply Scheme. ORD/000327/2025-2026 1756/AE-I/AMD 31/10/2025 10 SUNRISE ENGINEERING CORPORATION 0.72 0.00 100
1854 Asansol Mechanical SUPPLY AND INSTALLATION OF SUBMERSIBLE PUMPING MACHINERY, VOLTAGE STABILIZER, CHLORINATION SYSTEM AND INTERNAL HOUSE WIRING FOR TUBE WELL NO-4 &5 AT TETIKHOLA PIPED WATER SUPPLY SCHEME UNDER ASANSOL MECHANICAL DIVISION, PHE DTE., BOLCK- DURGAPUR-FARIDPUR, DIST- PASCHIM BARDHAMAN. ORD/000360/2024-2025 1925/AMD 19/11/2024 165 PESTCO INDIA 22.69 0.00 0
1855 Asansol Mechanical Withdrawing and lowering of submersible pump motor set at Kantaberia T/W No- 1(In between O.H.R. premise's GBTW) under Kantaberia Water Supply Scheme. ORD/000367/2025-2026 1859/AE-I/AMD 24/11/2025 10 M/S SWAPAN BANERJEE 0.92 0.00 100
1856 Asansol Mechanical Providing And Installation of Submersible pumping Machineries, PDB-Cum-MCC Panel and other Electro-Mechanical accessories at Head Works site at Pansuli under Augmentation of RCFA Part-III (Zone-I) Water Supply Scheme, Block-Faridpur-Durgapur, Dist.-Paschim Bardhaman. ORD/000392/2022-2023 252/AMD 02/02/2023 30 INDUSTRIAL ELECTRICAL CORPORATION 33.68 30.80 0
1857 Asansol Mechanical Additional work related to Providing House to House Connection from existing distribution system at Kanyapur (near Durgamandir) under Nuni Panchgachia Zone Piped Water Supply Scheme. ORD/000398/2021-2022 145/AMD 11/02/2022 7 M/S SWAPAN BANERJEE 2.46 2.45 0
1858 Asansol Mechanical Additional work related to Providing House to House Connection from existing distribution system at Kapatiya Village & Saroda Pally within Panchgachia Zone Piped Water Supply Scheme. ORD/000399/2021-2022 146/AMD 11/02/2022 7 UNIQUE ENTERPRISE 3.25 3.22 0
1859 Asansol Mechanical Additional work related to Providing House to House Connection from existing distribution system at Choto Nuni (Majhi Para) and Upadhya Para withih Panchgachia Zone Piped Water Supply Scheme. ORD/000400/2021-2022 147/AMD 11/02/2022 7 ANANYA CONSTRUCTION 3.72 3.70 0
1860 Asansol Mechanical Additional work related to Providing House to House Connection from existing distribution system at Sen-Raliegh B. Block within Panchgachia Zone Piped Water Supply Scheme. ORD/000401/2021-2022 148/AMD 11/02/2022 7 VIKING TRADERS 1.30 1.29 0
1861 Asansol Mechanical Additional work related to Providing House to House Connection from existing distribution system at Nuni village within Nuni and Adjoining Mouzas and Panchgachia Zone Piped Water Supply Scheme. ORD/000402/2021-2022 149/AMD 11/02/2022 7 HINDUSTHAN CONSULTANT FIRM 1.29 0.00 0
1862 Asansol Mechanical Additional work related to Providing House to House Connection from existing distribution system at Nuni Namo Para within Nuni and Adjoining Mouzas and Panchgachia Zone Piped Water Supply Scheme. ORD/000403/2021-2022 150/AMD 11/02/2022 7 PESTCO INDIA 3.74 3.72 0
1863 Asansol Mechanical Additional work related to Providing House to House Connection from existing distribution system at Nadiha Market (Gandhinagar) under Panchgachia Zone Piped Water Supply Scheme. ORD/000404/2021-2022 151/AMD 11/02/2022 7 M/S SWAPAN BANERJEE 3.22 3.20 0
1864 Asansol Mechanical Additional work related to Providing House to House Connection from existing distribution system at Nayabasti (Gandhinagar) under Panchgachia Zone Piped Water Supply Scheme. ORD/000405/2021-2022 152/AMD 11/02/2022 7 M/S JIT ENTERPRISE 4.56 4.54 0
1865 Asansol Mechanical Additional work related to Providing House to House Connection from existing distribution system at Monoharbohal Village under Panchgachia Zone Piped Water Supply Scheme. ORD/000406/2021-2022 153/AMD 11/02/2022 7 PESTCO INDIA 2.93 2.91 0
1866 Asansol Mechanical Supply, delivery & installation of Pumping Machineries and other Electro-Mechanical equipment at Jamgram Piped Water Supply Scheme under Asansol Mechanical Division, P.H.E Dte. Block- Barabani, District-Paschim Bardhaman. ORD/000411/2022-2023 360/AMD 09/02/2023 90 INDUSTRIAL ELECTRICAL CORPORATION 46.39 45.36 100
1867 Asansol Mechanical Supply and Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube Well No-03 At augmentation of Krishnapur Piped Water Supply Scheme under Asansol Mechanical Division, PHE Dte, Block- Kanksa, Dist- Paschim Bardhaman. ORD/000411/2024-2025 1982/AMD 27/11/2024 30 M/S JIT ENTERPRISE 11.63 0.00 0
1868 Asansol Mechanical Supply, delivery and installation of Electro-Mechanical equipments in existing Ramnagar Pump House in the basis of "Augmentation of Ramnagar Head works Site under R.C.F.A.-III(Zone-II)" Water Supply Scheme under Asansol Mechnical Division,P.H.E. Dte. ORD/000412/2022-2023 361/AMD 09/02/2023 811 SUNRISE ENGINEERING CORPORATION 65.77 51.13 100
1869 Asansol Mechanical Supply, delivery and installation of Electro-Mechanical equipment at Mahal & ECL Head Works site in the basis for ''Augmentation of Ramnagar Head Works site under R.C.F.A.-III(Zone-II) water supply scheme" under Asansol Mechanical Division, P.H.E. Dte., Block-Pandabeswar, District-Paschim Bardhaman. ORD/000413/2022-2023 362/AMD 09/02/2023 90 R.N.S TRADING 83.82 52.68 62
1870 Asansol Mechanical Providing and installation of Gaseous Chlorination system at Dendua Boosting Station under Augmentation of RCFA Part-I water Supply Scheme, Block-Salanpur, Dist.- Paschim Bardhaman. ORD/000414/2022-2023 363/AMD 09/02/2023 729 EASTERN INDIA SALES AND SERVICE 20.86 18.44 100
1871 Asansol Mechanical Providing and installation of Gaseous Chlorination system at OHR Site at under Zone-VI under Augmentation of RCFA Part-I Water Supply Scheme, Dist.- Paschim Bardhaman. ORD/000415/2022-2023 364/AMD 09/02/2023 930 MAHADEV ENTERPRISE 20.86 18.56 100
1872 Asansol Mechanical Providing and installation of Gaseous Chlorination system at OHR Site under Zone-VII under Augmentation of RCFA Part-I water Supply Scheme, Block-Salanpur, Dist.- Paschim Bardhaman. ORD/000416/2022-2023 365/AMD 09/02/2023 1676 ORIENTAL ENGINEERING CO. 20.75 18.34 80
1873 Asansol Mechanical Providing and installation of Gaseous Chlorination system at OHR Site under Zone-IX under Augmentation of RCFA Part-I water Supply Scheme, Block-Salanpur, Dist.- Paschim Bardhaman. ORD/000417/2022-2023 366/AMD 09/02/2023 919 ELECTRICAL & MECHANICAL ENGINEERING CORPORATION 20.85 18.55 100
1874 Asansol Mechanical Providing And Installation of Electro-Mechanical Equipments and Allied Works at Dendua Boosting Station under Augmentation of RCFA Part-I Water Supply Scheme, Block-Salanpur, Dist.-Paschim Bardhaman. ORD/000418/2022-2023 1951/AMD 22/12/2022 771 EASTERN INDIA SALES AND SERVICE 129.01 72.34 100
1875 Asansol Mechanical Providing and installation of Gaseous Chlorination system at OHR Site under Zone-XI under Augmentation of RCFA Part-I water Supply Scheme, Dist.- Paschim Bardhaman. ORD/000421/2022-2023 418/AMD 16/02/2023 919 MACHINE SUPPLIERS SYNDICATE(P) LTD. 20.56 18.28 100
1876 Asansol Mechanical Supply, delivery & installation of Electro-Mechanical equipment and other allied works at Kajora Piped Water Supply Scheme under Asansol Mechanical Division, P.H.E Dte. Block-Andal, District-Paschim Bardhaman. ORD/000431/2022-2023 483/AMD 22/02/2023 867 ORIENTAL ENGINEERING CO. 393.09 286.06 100
1877 Asansol Mechanical Providing and Installation of Electro-Mechanical Equipments and allied Works at Damalia under Augmentation of Amritnagar Zone-I Water Supply Scheme, Block : Raniganj, Dist -Paschim Bardhaman. ORD/000432/2022-2023 484/AMD 22/02/2023 365 ORIENTAL ENGINEERING CO. 114.65 72.08 100
1878 Asansol Mechanical Providing and Installation of Electro-Mechanical Equipments and Allied Works at Panuria under Augmentation of Panuria Itapara Water Supply Scheme, Block-Baraboni, Dist.-Paschim Bardhaman. ORD/000433/2022-2023 488/AMD 22/02/2023 365 BENGAL CONSTRUCTION 180.00 122.45 68
1879 Asansol Mechanical Providing and Installation of Electro-Mechanical Equipments and allied works under Augmentation of Andal (Phase-II/A) Water Supply Scheme, Block : Andal, Dist -Paschim Bardhaman. ORD/000435/2022-2023 490/AMD 22/02/2023 557 EASTERN INDIA SALES AND SERVICE 151.50 105.83 100
1880 Asansol Mechanical Providing and Installation of Electro-Mechanical Equipments and allied works under Augmentation of Jamuria (Rural) Zone - I & II Water Supply Scheme, Block : Jamuria, Dist -Paschim Bardhaman. ORD/000436/2022-2023 491/AMD 22/02/2023 731 SUNRISE ENGINEERING CORPORATION 145.50 94.72 100
1881 Asansol Mechanical Providing and Installation of Electro-Mechanical Equipments and allied works under Augmentation of Bagdiha Water Supply Scheme, Block : Jamuria, Dist -Paschim Bardhaman. ORD/000437/2022-2023 492/AMD 22/02/2023 365 PREMNATH MITRA 126.31 31.11 25
1882 Asansol Mechanical Providing And Installation of Electro-Mechanical Equipments and Sub-Stations Equipments at Ethora Boosting Station under Improvement of RCFA Part-I Water Supply Scheme, Block-Salanpur, Dist.-Paschim Bardhaman. ORD/000437/2023-2024 2012/AMD 06/11/2023 366 NEW ALIGNMENT 267.24 181.05 67
1883 Asansol Mechanical Providing & fitting, fixing of lighting luminaries, electrical wiring of pump house & Substation Buliding with Yard lighting arrangement and other allied works at Ethora Boosting Station under " improvement of RCFA Part-I" Water Supply Scheme. ORD/000437/2024-2025 2095/AMD 12/12/2024 30 PREMNATH MITRA 23.48 0.00 100
1884 Asansol Mechanical Providing and Installation of Submersible pumping Machineries at newly sunk River Bed Tube Well no-9 and 10 at Narayankuri Pump House under Source Augmentation of RCFA Part-II Water Supply Scheme. ORD/000438/2024-2025 2096/AMD 12/12/2024 30 PREMNATH MITRA 9.89 0.00 0
1885 Asansol Mechanical Providing & fitting, fixing of lighting luminaries, electrical wiring of pump house with yard lighting arrangement and other allied works at Madhaiganj Boosting Station under Sharpi & adjoining mouzs Piped Water Supply Scheme. ORD/000441/2024-2025 2099/AMD 12/12/2024 30 M/S SWAPAN BANERJEE 19.61 0.00 0
1886 Asansol Mechanical Supply and Installation of Submersible Pumping Machinery and Internal House Wiring for Tube Well No-02 At augmentation of Garadaha Piped Water Supply Scheme under Asansol Mechanical Division, PHE Dte, Block- Kanksa, Dist- Paschim Bardhaman. ORD/000448/2024-2025 2115/AMD 16/12/2024 30 V. P. CONCERN 4.93 0.00 0
1887 Asansol Mechanical Providing & fitting, fixing of lighting luminaries, electrical wiring of pump house & Substation Buliding with Yard lighting arrangement and other allied works at Mahal & ECL Pump House under RCFA Part-III(Zone-II) Water Supply Scheme. ORD/000449/2024-2025 2116/AMD 16/12/2024 30 SUNRISE ENGINEERING CORPORATION 20.39 0.00 0
1888 Asansol Mechanical Allied Works Corresponding to "Providing And Installation of Electro-Mechanical Equipments and Sub-Stations Equipments at Ethora Boosting Station under Improvement of RCFA Part-I Block:- Salanpur, Dist -Paschim Bardhaman. ORD/000452/2024-2025 2121/AMD 16/12/2024 142 NEW ALIGNMENT 8.12 0.00 70
1889 Asansol Mechanical Supply And Installation Of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System And Internal House Wiring For Tube Well No-4, Tube Well No-5 and Tube Well No-6 At Augmentation Of Bistupur Piped Water Supply Scheme Under Asansol Mechanical Division, PHE. Dte. ORD/000453/2024-2025 2119/AMD 16/12/2024 242 M/S SAJAHAN CHOWDHURY 34.81 0.00 33
1890 Asansol Mechanical SUPPLY, DELIVERY AND INSTALLATION OF SUBMERSIBLE PUMPING MACHINERY, VOLTAGE STABILIZER, CHLORINATION SYSTEM AND INTERNAL HOUSE WIRING FOR TUBE WELL NO-3 AT AUGMENTATION OF JATGORIA PIPED WATER SUPPLY SCHEME UNDER ASANSOL MECHANICAL DIVISION, PHE DTE. ORD/000473/2024-2025 2181/AMD 26/12/2024 30 SAIKET SINHA 11.61 0.00 0
1891 Asansol Mechanical SUPPLY, DELIVERY AND INSTALLATION OF SUBMERSIBLE PUMPING MACHINERY, VOLTAGE STABILIZER, CHLORINATION SYSTEM AND INTERNAL HOUSE WIRING FOR TUBE WELL NO-3 (Near Canalpar) , TUBE WELL NO-4 (Biharpur) and TUBE WELL NO-5 AT AMLAJORA PIPED WATER SUPPLY SCHEME UNDER ASANSOL MECHANICAL DIVISION, PHE DTE. ORD/000474/2024-2025 1889/AMD 12/11/2024 30 DEY ENTERPRISE 37.85 0.00 0
1892 Asansol Mechanical Providing And Installation of Electro-Mechanical Equipments and Allied Works at Gourandi under Augmentation of Roshna Piped Water Supply Scheme, Block-Baraboni, Dist.-Paschim Bardhaman. ORD/000504/2022-2023 606/AMD 03/03/2023 90 M/S SWAPAN BANERJEE 32.53 21.61 70
1893 Asansol Mechanical Supply, delivery & installation of Pump Motor Set in the basis of "Augmentation of Madantor & Its Adjoining Mouzas "Piped Water Supply Scheme under Asansol Mechanical Division, P.H.E Dte. Block-Jamuria, District-Paschim Bardhaman. ORD/000505/2022-2023 607/AMD 03/03/2023 580 M/S. SOMA ENTERPRISE 14.44 11.82 100
1894 Asansol Mechanical Providing and installation of Gaseous Chlorination system at OHR Site under Zone-XIII under Augmentation of RCFA Part-I water Supply Scheme, Dist.- Paschim Bardhaman. (2nd Call). ORD/000506/2022-2023 608/AMD 03/03/2023 90 M/S SAJAHAN CHOWDHURY 20.86 18.56 80
1895 Asansol Mechanical Providing and Installation of Substation Equipments and other Accessories at Ramnagar Head Works Site Under RCFA Part-III (Zone-II) Water Supply Scheme, Block: Pandabeswar, Dist. Paschim Bardhaman. ORD/000520/2023-2024 8/AMD 02/01/2024 366 R.N.S TRADING 145.04 0.00 0
1896 Asansol Mechanical Allied Works Corresponding to "Providing and Installation of Substation Equipments and other Accessories at Ramnagar Head Works Site Under RCFA Part-III (Zone-II) Water Supply Scheme, Block: Pandabeswar, Dist. Paschim Bardhaman. ORD/000524/2024-2025 145/AMD 05/02/2025 30 BENGAL CONSTRUCTION 8.18 0.00 0
1897 Asansol Mechanical Providing 33KV, 25KA, 1250A, 2 Panel VCB & 33KV Metering Arrangement & Relay Panel for Substation at Water Treatment Plant under Augmentation of RCFA Par-Il Piped W/S Scheme. ORD/000527/2024-2025 148/AMD 05/02/2025 30 WEST BENGAL ENGINEERING CO. 44.40 0.00 0
1898 Asansol Mechanical Supply,delivery & installation of Electro-Mechanical equipment and other allied works at Ajoyghat Head Works Site in the basis of "Augmentation of Churulia & Its Adjoining Mouzas"Piped Water Supply Scheme under Asansol Mechanical Division,P.H.E Dte. Block-Jamuria, District-Paschim Bardhaman. ORD/000538/2022-2023 747/AMD 16/03/2023 1346 BENGAL CONSTRUCTION 116.52 60.15 100
1899 Asansol Mechanical Supply & installation of Submersible Pumping Machineries, Voltage Stabilizer, Chlorination System and internal House wiring for Tube Well No-I at Amlajora Water Supply Scheme, under Asansol Mechanical Division, P.H.E Dte. ORD/000631/2023-2024 530/AMD 12/03/2024 90 P.K.ENGINEERING 11.43 11.15 100
1900 Asansol Mechanical Supply & installation of Submersible Pumping Machineries, Voltage Stabilizer, Chlorination System and internal House wiring for Tube Well No-II at Amlajora Water Supply Scheme, under Asansol Mechanical Division, P.H.E Dte. ORD/000632/2023-2024 531/AMD 12/03/2024 90 M/S SAJAHAN CHOWDHURY 11.46 11.46 100
1901 Asansol Mechanical Supply & installation of Submersible Pumping Machineries, Voltage Stabilizer, Chlorination System and internal House wiring for Rupganj Water Supply Scheme, P/H No-05 under Asansol Mechanical Division, P.H.E Dte. ORD/000633/2023-2024 532/AMD 12/03/2024 90 M/S S.G.ENTERPRISE 11.47 10.79 100
1902 Asansol Mechanical Lowering of Submersible Pumping machineries in the Newly sunk River Bed Tube Well No-11,12,13,14 & 15 and other allied works at Ramprasadpur HeadWorks Site under Andal Water Supply Scheme. ORD/000650/2023-2024 554/AMD 14/03/2024 30 EASTERN INDIA SALES AND SERVICE 6.62 6.58 100
1903 Asansol Mechanical Lowering of Submersible Pumping Machineries for Newly Sunk RBTWs under Panuria Water Supply Scheme. ORD/000652/2023-2024 552/AMD 14/03/2024 30 BENGAL CONSTRUCTION 6.28 6.28 100
1904 Asansol Mechanical Providing and Installation of LT PDB Panel at Kalyaneswari Head works site under improvement of RCFA Part-I Water Supply Scheme. ORD/000751/2024-2025 601/AMD 12/03/2025 90 ELECTRICAL & MECHANICAL ENGINEERING CORPORATION 91.78 0.00 0
1905 Asansol Mechanical Different Electro-mechanical works in connection with the execution of Electrical Sub-station and other works at Intake under Augmentation of RCFA Part-II Piped Water Supply Scheme. ORD/000806/2024-2025 617/AMD 13/03/2025 90 WEST BENGAL ENGINEERING CO. 119.63 0.00 0
Total 1,17,430.37 55,861.95