| Sl No. | Division
Working Divisions
|
Sub Division
Working Divisions
|
Work Name
Name of the Work as per the Issued Work Order
|
Name of AE entrusted | Name of JE entrusted | System Order No.
System Order Number
|
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
|
WO Date
Date of Issuance of Work Order
|
Days of Completion
Target Days for Work Completion as per PHED-MIS
|
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
|
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
|
Payment
Amount of Payment made for this Work Order as per PHED-MIS
|
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
|
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 812 | 49,627.56 | 25,602.4 | |||||||||||
| 1 | Barasat Division | Enhancement of GST for the work providing FHTC for Augmentation of Kalinagar (Zone-II) W/S Scheme | BILL/00275/2024-2025 | BP-2024-25-78 | 10/07/2024 | 0 | UMWELT ENGINEER PVT.LTD. | 6.76 | 0.00 | 0 | |||
| 2 | Barasat Division | Restoration works | BILL/00743/2024-2025 | BP-2024-25-240 | 06/09/2024 | 0 | EXECUTIVE ENGINEER-II, P.W.D,BARASAT DIVN | 16.77 | 0.00 | 0 | |||
| 3 | Barasat Division | Restoration works | BILL/00744/2024-2025 | BP-2024-25-240 | 06/09/2024 | 0 | EXECUTIVE ENGINEER-II, P.W.D,BARASAT DIVN | 2.80 | 0.00 | 0 | |||
| 4 | Barasat Division | Acceptance cum Work Order for Providing Functional Household Tap Connection (FHTC) in Bankra mouza including laying of UPVC/PVC pipe & supply of necessary fittings within Hingalganj Water Supply Scheme (Zone-II), at Hingalganj Block under Hasnabad Sub-Division, PHE Dte. | ORD/000002/2022-2023 | 1295/ BD | 05/04/2022 | 60 | MONDAL PRECISION PVT.LTD | 112.27 | 0.00 | 1 | |||
| 5 | Barasat Division | Formal work order for Providing Functional Household Tap Connection(FHTC) from existing and new proposed distribution system within the command area under Patua Water Supply Scheme at SWARUPNAGAR Block, Dist.- North 24 Parganas under Barasat Division. PHE. Dte. (PHASE-I) | ORD/000007/2022-2023 | 1177/BD | 19/04/2022 | 90 | KINGS & CO. | 193.55 | 172.97 | 1 | |||
| 6 | Barasat Division | Formal work order for Protection work for newly laid UPVC pipe line at different places of Sukhdoani Mouza in connection with retrofitting of Sukhdoani w/s scheme, Sandeshkhali-II block under Hasnabad Sub- Division P.H.E. Dte. | ORD/000010/2023-2024 | 1165/BD | 13/04/2023 | 30 | SUPRITI ENTERPRISE. | 68.84 | 68.78 | 0 | |||
| 7 | Barasat Division | Formal work order for Protection work in different places of Jhupkhali Mouza in connection with retrofitting of Jhupkhali w/s scheme, Sandeshkhali-II block under Hasnabad Sub- Division P.H.E. Dte. | ORD/000034/2023-2024 | 1324/BD | 28/04/2023 | 30 | RADIANT | 112.53 | 112.39 | 0 | |||
| 8 | Barasat Division | Formal work order for Protection work for newly laid UPVC pipe line at different places of Ghoshpur, Kalinagar & Roypur Mouza in connection with retrofitting of Kalinagar w/s scheme (Z-I), Sandeshkhali-I block under Hasnabad Sub- Division P.H.E. Dte. | ORD/000040/2023-2024 | 1358/BD | 04/05/2023 | 30 | UMWELT ENGINEER PVT.LTD. | 134.62 | 134.69 | 100 | |||
| 9 | Barasat Division | Formal work order for Protection work for newly laid UPVC pipe line at different places of Gajalia, Putimari & Ghatihara Mouza in connection with retrofitting of Kalinagar w/s scheme (Z-II), Sandeshkhali-I block under Hasnabad Sub- Division P.H.E. Dte. | ORD/000041/2023-2024 | 1359/BD | 04/05/2023 | 30 | UMWELT ENGINEER PVT.LTD. | 138.59 | 138.51 | 59 | |||
| 10 | Barasat Division | Formal work order for Protection work for newly laid UPVC pipe line at different places of Dhuchnikhali Mouza, Korakati Mouza, & Monipur Mouza in connection with retrofitting of Joygopalpur w/s scheme, Sandeshkhali-II block under Hasnabad Sub- Division P.H.E. Dte. | ORD/000042/2023-2024 | 1360/BD | 04/05/2023 | 30 | ALOK ENTERPRSE. (A UNIT OF SAKET TREXIM PVT.LTD) | 117.20 | 0.00 | 0 | |||
| 11 | Barasat Division | Acceptance cum work order for Protection of newly laid UPVC pipe line for providing FHTC by bamboo pilling at different places of Bashberia within Baunia Abad w/s scheme, Sandeshkhali-II block under Hasnabad Sub- Division P.H.E. Dte. | ORD/000069/2022-2023 | 785/HSD | 13/05/2022 | 10 | M/S DATTA ENTERPRISE. | 4.85 | 4.83 | 1 | |||
| 12 | Barasat Division | Acceptance cum work order for Construction of approach road with cement concrete at PH No.-3 within Joygopalpur w/s scheme, Sandehkhali-II block under Hasnabad Sub-Division P.H.E. Dte. | ORD/000076/2022-2023 | 792/HSD | 13/05/2022 | 10 | UNIFIED ENGINEERS' CO-OPERATIVE SOCIETYLTD. | 0.80 | 0.00 | 1 | |||
| 13 | Barasat Division | Formal work order for Providing Functional Household Tap Connection (FHTC) in connection with Jal Jeevan Mission (JJM) and Jal Swapna programme within command area of Daudpur w/s scheme, Sandeshkhali-II block under Hasnabad Sub-Division, PHE Dte. | ORD/000081/2022-2023 | 1492/BD | 25/05/2022 | 90 | M/S S.S.ENTERPRISE. (SOUTH) | 164.51 | 125.08 | 1 | |||
| 14 | Barasat Division | Formal work order for Providing Functional Household Tap Connection (FHTC) in connection with Jal Jeevan mission (JJM and Jal Swapna) within command area of Kalinagar (Zone-II) W/S Scheme, Sandeshkhali-I Block, Dist. - North 24 Parganas under Hasnabad Sub-Division, PHE. Dte. | ORD/000082/2022-2023 | 1506/BD | 26/05/2022 | 90 | UMWELT ENGINEER PVT.LTD. | 208.93 | 199.91 | 47 | |||
| 15 | Barasat Division | Formal work order for Providing Functional Household Tap Connection (FHTC) in connection with Jal Jeevan Mission (JJM) and Jal Swapna Programme within command area of Rampur w/s scheme, Sandeshkhali-II block under Hasnabad Sub-Division, PHE Dte. | ORD/000083/2022-2023 | 1539/BD | 30/05/2022 | 90 | S.S.ENTERPRISE. (BAMANGACHI) | 158.70 | 155.05 | 1 | |||
| 16 | Barasat Division | Formal work order for Providing Functional Household Tap Connection (FHTC) in connection with Jal Jeevan Mission (JJM) and Jal Swapna Programme within command area of Laukhali W/s scheme Sandeshkhali-I block under Hasnabad Sub-Division, PHE Dte. | ORD/000085/2022-2023 | 1569/BD | 01/06/2022 | 90 | M/S S.S.ENTERPRISE. (SOUTH) | 250.04 | 186.86 | 100 | |||
| 17 | Barasat Division | Formal work order for Providing Functional Household Tap Connection (FHTC) in connection with Jal Jeevan Mission (JJM) and Jal Swapna Programme within command area of Kalinagar W/s scheme (Zone-I), Sandeshkhali-I block under Hasnabad Sub-Division, PHE Dte. | ORD/000086/2022-2023 | 1570/BD | 01/06/2022 | 90 | UMWELT ENGINEER PVT.LTD. | 274.51 | 255.99 | 1 | |||
| 18 | Barasat Division | Formal work order for Providing Functional Household Tap Connection (FHTC) in connection with Jal Jeevan Mission (JJM) and Jal Swapna Programme within command area of Tushkhali W/s scheme, Sandeshkhali-II block under Hasnabad Sub-Division, PHE Dte. | ORD/000087/2022-2023 | 1604/BD | 07/06/2022 | 90 | J.D.J.ENTERPRISE. (TRADERS PVT.LTD) | 183.73 | 164.74 | 0 | |||
| 19 | Barasat Division | Formal work order for Providing Functional Household Tap Connection (FHTC) in connection with Jal Jeevan Mission (JJM) and Jal Swapna Programme within command area of Jeliakhali Purba Khanda W/s scheme, Sandeshkhali-II block under Hasnabad Sub-Division, PHE Dte. | ORD/000088/2022-2023 | 1605/BD | 07/06/2022 | 90 | SUBHASH BOSE. | 126.81 | 120.92 | 1 | |||
| 20 | Barasat Division | Formal work order for Protection work in different places of Jeliakhali Mouza in connection with retrofitting of Jeliakhali Purba Khanda w/s scheme, Sandeshkhali-II block under Hasnabad Sub- Division P.H.E. Dte. | ORD/000091/2023-2024 | 1496/BD | 17/05/2023 | 30 | SUBHASH BOSE. | 137.02 | 135.82 | 100 | |||
| 21 | Barasat Division | Formal work order for Providing Functional Household Tap Connection (FHTC) in connection with Jal Jeevan Mission (JJM) and Jal Swapna Programme within command area of Jhupkhali w/s scheme, Sandeshkhali-II block under Hasnabad Sub-Division, PHE Dte. | ORD/000093/2022-2023 | 1617/BD | 07/06/2022 | 90 | RADIANT | 124.77 | 123.97 | 0 | |||
| 22 | Barasat Division | Acceptance cum work order for Emergent restoration of different dia UPVC pipe line for damage portion at different places due widening of PWD road of Hingalganj w/s Scheme (Zone-I), Hingalganj block under Hasnasbad Sub-Division, P.H.E.Dte. | ORD/000096/2022-2023 | 914/HSD | 07/06/2022 | 15 | MONDAL & CO. (BASIRHAT). | 4.90 | 4.90 | 1 | |||
| 23 | Barasat Division | Formal work order for Protection work for newly laid UPVC pipe line at different places of Rampur & Dhamakhali Mouza in connection with retrofitting of Rampur w/s scheme, Sandeshkhali-II block under Hasnabad Sub- Division P.H.E. Dte. | ORD/000109/2023-2024 | 1670/BD | 06/06/2023 | 30 | S.S.ENTERPRISE. (BAMANGACHI) | 115.27 | 115.23 | 60 | |||
| 24 | Barasat Division | Formal work order for Protection work in different places of Bhangatushkhali Mouza in connection with retrofitting of Bhangatushkhali w/s scheme, Sandeshkhali-II block under Hasnabad Sub- Division P.H.E. Dte. | ORD/000119/2023-2024 | 1697/BD | 08/06/2023 | 30 | AMAL DUTTA ROY | 167.81 | 150.24 | 100 | |||
| 25 | Barasat Division | Acceptance cum work order for Emergent restoration of concrete road for damage portion at different places for providing FHTC within Rupmari w/s scheme (Zone-III to VI), Hingalganj block under Hasnabad Sub-Division P.H.E. Dte. | ORD/000125/2022-2023 | 940/HSD | 07/06/2022 | 15 | M/S DATTA ENTERPRISE. | 3.08 | 3.08 | 1 | |||
| 26 | Barasat Division | Acceptance cum work order for Withdrawing & relaying of 75 mm dia. HDPE pipe line from near Halda High School towards Kumirmari kheya Ghat for damage portion within Rupmari W/S Scheme (Z-III & IV), Hingalganj block under Hasnasbad Sub-Division, P.H.E.Dte. | ORD/000126/2022-2023 | 941/HSD | 07/06/2022 | 10 | M/S PROGATI ENTERPRISE. | 4.92 | 4.92 | 1 | |||
| 27 | Barasat Division | Formal work order for Providing Functional Household Tap Connection (FHTC) in connection with Jal Jeevan Mission (JJM) and Jal Swapna Programme within command area of Sukhdaoni w/s scheme, Sandeshkhali-II block under Hasnabad Sub-Division, PHE Dte. | ORD/000153/2022-2023 | 1660/BD | 10/06/2022 | 90 | SUPRITI ENTERPRISE. | 113.40 | 102.01 | 1 | |||
| 28 | Barasat Division | Formal work order for Providing Functional Household Tap Connection (FHTC) in connection with Jal Jeevan Mission (JJM) and Jal Swapna Programme within command area of Chunchura w/s scheme, Sandeshkhali-I block under Hasnabad Sub-Division, PHE Dte. | ORD/000163/2022-2023 | 1667/BD | 13/06/2022 | 90 | S. GHOSH & ASSOCIATES PVT. LTD. | 266.33 | 243.28 | 1 | |||
| 29 | Barasat Division | Formal work order for Providing Functional Household Tap Connection (FHTC) in connection with Jal Jeevan Mission (JJM) and Jal Swapna Programme within command area of Bhangatushkhali w/s scheme, Sandeshkhali-II block under Hasnabad Sub-Division, PHE Dte. | ORD/000164/2022-2023 | 1668/BD | 13/06/2022 | 90 | S. GHOSH & ASSOCIATES PVT. LTD. | 168.43 | 167.55 | 1 | |||
| 30 | Barasat Division | Acceptance cum work order for Construction of 300 cum capacity 20 mtr. staging height R.C.C. Over Head Water Reservoir as per Departmental design, drawing and specification including bored pile & pile cap at Rajbari water supply scheme, Sandeshkhali-I block under Hasnabad Sub-Division, PHE Dte. | ORD/000168/2022-2023 | 1152/BD | 12/04/2022 | 240 | S.S.ENTERPRISE. (BAMANGACHI) | 97.05 | 30.31 | 1 | |||
| 31 | Barasat Division | Acceptance cum work order for Construction of 350 cum capacity 20 mtr. staging height R.C.C. Over Head Water Reservoir as per Departmental design, drawing and specification including bored pile & pile cap at Chotto Sehara water supply scheme, Sandeshkhali-I block under Hasnabad Sub-Division, PHE Dte. | ORD/000169/2022-2023 | 1153/BD | 12/04/2022 | 240 | M/S S.S.ENTERPRISE. (SOUTH) | 146.26 | 49.03 | 1 | |||
| 32 | Barasat Division | Formal work order for Providing Functional Household Tap Connection (FHTC) in connection with Jal Jeevan Mission (JJM) and Jal Swapna Programme within command area of Joygopalpur w/s scheme, Sandeshkhali-II block under Hasnabad Sub-Division, PHE Dte. | ORD/000173/2022-2023 | 1746/BD | 20/06/2022 | 90 | ALOK ENTERPRSE. (A UNIT OF SAKET TREXIM PVT.LTD) | 278.19 | 213.07 | 1 | |||
| 33 | Barasat Division | Acceptance cum work order for Sinking of 2 nos. 300 mm. x 200 mm. dia. 360 mtr deep as replacement Tubewell by D.R. Rig method at PH No.- 1 & 2 with PVC pipe & strainer having 250mm dia 36 mtr. long housing pipe & 150mm dia 30 mtr. long filter at Rajbari w/s scheme, Sandeshkhali-I block under Hasnabad Sub-Division, P.H.E. Dte. | ORD/000174/2022-2023 | 1893/BD | 05/07/2022 | 30 | BABUSONA CONSTRUCTION. | 43.55 | 37.54 | 0 | |||
| 34 | Barasat Division | Acceptance cum work order for Sinking of 1 no. 300 mm. x 200 mm. dia. 360 mtr deep Tubewell by D.R. Rig method at PH No.- 1 (Defunct tube well site) with PVC pipe & strainer having 300mm dia 36 mtr. long housing pipe & 200mm dia 30 mtr. long filter for Augmentation of Rupmari w/s scheme (Zone-V), Hingalganj block under Hasnabad Sub-Division, P.H.E. Dte. | ORD/000175/2022-2023 | 1750/BD | 20/06/2022 | 30 | M/S K.P.PAL. | 21.33 | 13.02 | 1 | |||
| 35 | Barasat Division | Acceptance cum work order for Construction of 100 cum/hr Iron Removal Plant with blower room & other allied works within Laukhali w/s scheme, Sandeshkhali-I block under Hasnabad Sub-Division P.H.E. Dte. | ORD/000192/2025-2026 | 2024/BD | 18/06/2025 | 150 | FIDERE MARINE SERVICES PVT. LTD. | 38.30 | 0.00 | 0 | |||
| 36 | Barasat Division | Continuation work order for the work of Hiring Diesel Luxury Car on daily basis for the Office of the Dy. Superintending Engineer-I, Monitoring Cell, PHE Dte. (Period from 01-07-2022 to 31-12-2022). | ORD/000193/2022-2023 | 1819/BD | 27/06/2022 | 184 | DIPANKAR NASKAR. | 0.87 | 1.77 | 1 | |||
| 37 | Barasat Division | Continuation work order for the work of Hiring Diesel Luxury Car on daily basis (for 6months from 01-07-2022 to 30-09-2022) for the Office of the Assistant Engineer (HQ), Barasat Division, PHE Dte. | ORD/000221/2022-2023 | 1863/BD | 30/06/2022 | 92 | M/S SAMIT CHANDRA DEY. | 0.44 | 0.71 | 1 | |||
| 38 | Barasat Division | Acceptance cum work order for Supply of Mechanized boat on hire basis with providing driver, helper and other requirement as per terms condition and specification as per direction of the EIC under Hasnabad Sub-Division, P.H.E. Dte. Period : 01.08.2022 to 31.07.2023 = 365 days. | ORD/000224/2022-2023 | 1118/HSD | 08/07/2022 | 1 | RANJIT KUMAR MANDAL. | 3.23 | 11.93 | 100 | |||
| 39 | Barasat Division | Acceptance cum work order for Protection works for rising main of 150mm dia. DI pipe line at pond of Muyajjem Husien Molla within Sultanpur w/s scheme, Minakhan block under Hasnabad Sub-Division P.H.E. Dte. | ORD/000234/2022-2023 | 1143/HSD | 12/07/2022 | 10 | MONDAL & CO. (BASIRHAT). | 4.69 | 4.65 | 1 | |||
| 40 | Barasat Division | Acceptance cum work order for Protection works for newly laid different dia. UPVC/DI pipe line at different places in Mamudpur mouza within Hingalganj W/S/Scheme(Z-I). Hingalganj Block under Hasnabad Sub -Division P.H.E. Dte. | ORD/000237/2021-2022 | 1461/BD | 13/08/2021 | 15 | M/S K.B.ENTERPRISE. | 16.06 | 14.00 | 1 | |||
| 41 | Barasat Division | Acceptance cum work order for Construction of anchor block for resting of 100/150 mm dia DI pipeline at different places within Laukhali Patharghata w/s scheme, Sandeshkhali-I block under Hasnabad Sub-Division P.H.E. Dte. | ORD/000238/2022-2023 | 1147/HSD | 12/07/2022 | 15 | PRITAM MUKHOPADHYAY. | 4.06 | 3.97 | 0 | |||
| 42 | Barasat Division | Acceptance cum work order for Connection of OHR from rising main and other allied works at Head Work site within Bermajur w/s scheme, Sandeshkhali-II Block under Hasnabad Sub- Division P.H.E. Dte. | ORD/000243/2022-2023 | 1152/HSD | 12/07/2022 | 15 | M/S NIRMAN CONSTRUCTION. | 4.11 | 4.10 | 1 | |||
| 43 | Barasat Division | Acceptance cum work order for Additional works for approach road with cement concrete and other allied works at Head Work site within Bermajur w/s scheme, Sandeshkhali-II block under Hasnabad Sub- Division P.H.E. Dte. | ORD/000244/2022-2023 | 1153/HSD | 12/07/2022 | 15 | M/S NIRMAN CONSTRUCTION. | 1.55 | 1.55 | 1 | |||
| 44 | Barasat Division | Acceptance cum work order for Protection works for protection of DI rising main at near PH No- 3 (Old LS) within Hingalganj w/s scheme, Hingalganj block under Hasnabad Sub-Division P.H.E. Dte. | ORD/000247/2022-2023 | 1156/HSD | 12/07/2022 | 10 | RAJPATH ENGINEERS-CO-OPERATIVE SOCIETY LTD. | 2.53 | 2.53 | 1 | |||
| 45 | Barasat Division | Work Order for " Providing Functional Household Tap Connection (FHTC) in Sandlerbil Mouza including laying of UPVC/PVC pipe & supply of necessary fittings within Hingalganj W/S/Scheme (Zone-II), Hingalganj Block under Hasnabad Sub-Division, P.H.E.Dte." | ORD/000257/2020-2021 | 49/BD | 13/01/2021 | 90 | J.D.J.ENTERPRISE. (TRADERS PVT.LTD) | 155.31 | 29.14 | 1 | |||
| 46 | Barasat Division | Acceptance cum work order for Protection of newly laid UPVC pipe line by bamboo pilling at different places of Laukhali Mouza within Laukhali w/s scheme, Sandeshkhali-I block under Hasnabad Sub- Division P.H.E. Dte. | ORD/000260/2022-2023 | 1169/HSD | 12/07/2022 | 15 | M/S S.S.ENTERPRISE. (SOUTH) | 4.81 | 4.80 | 1 | |||
| 47 | Barasat Division | Acceptance cum work order for Construction of approach road with cement concrete and other allied works at PH No.- 3 within Hingalganj w/s scheme (Old), Hingalganj block under Hasnabad Sub- Division P.H.E. Dte. | ORD/000270/2022-2023 | 1192/HSD | 13/07/2022 | 15 | PRASANTA MITRA. | 3.44 | 3.08 | 91 | |||
| 48 | Barasat Division | Acceptance cum work order for Repairing of pump house & boundary wall at PH No.-2 within Kalinagar w/s scheme (Old), Sandeshkhali-I Block under Hasnabad Sub-Division, P.H.E. Dte. | ORD/000295/2023-2024 | 2106/BD | 19/07/2023 | 21 | M/S GHOSH CONSTRUCTION. | 7.10 | 7.10 | 58 | |||
| 49 | Barasat Division | Acceptance cum work order for Repairing of Pump House No.-3 & 4, construction of boundary wall & approach road at P.H.No.-3 & other allied works within Hingalganj w/s scheme (Old), Hingalganj Block under Hasnabad Sub-Division, P.H.E. Dte. | ORD/000297/2023-2024 | 2112/BD | 19/07/2023 | 21 | GOBINDA DAS. | 9.21 | 9.05 | 46 | |||
| 50 | Barasat Division | Acceptance cum work order for Repairing of pump house & boundary wall at P.H.-3 within Kalinagar w/s scheme (Old), Sandeshkhali-I Block under Hasnabad Sub-Division, P.H.E. Dte | ORD/000299/2023-2024 | 2114/BD | 19/07/2023 | 21 | GOBINDA DAS. | 7.21 | 7.21 | 59 | |||
| 51 | Barasat Division | Acceptance cum work order for Emergency repairing of existing FHTC along with pipe line in connection with retrofitting work at different places of Sukhdoani Mouza within Sukhdoani w/s scheme , Sandeshkhali-II block under Hasnasbad Sub-Division, P.H.E.Dte. | ORD/000312/2024-2025 | 885/HSD | 07/08/2024 | 10 | NEW LIFE CONSTRUCTION. | 0.96 | 0.96 | 100 | |||
| 52 | Barasat Division | Acceptance cum work order for Protection works for protection of UPVC distribution pipe line at N/H/O Laxmikanta Singh within Bermajur w/s Scheme, Sandeshkhali-II block under Hasnabad Sub-Division P.H.E. Dte. | ORD/000322/2022-2023 | 1243/HSD | 20/07/2022 | 15 | M/S ANUBHAB CONSTRUCTION. | 0.56 | 0.57 | 1 | |||
| 53 | Barasat Division | Acceptance cum Work Order for Providing Functional Household Tap Connection (FHTC) from existing and new proposed distribution system within the command area of Ghona Water Supply Scheme at Basirhat-II Block under Barasat Division, PHE Dte.(Phase-I). | ORD/000332/2021-2022 | 1653/BD | 07/09/2021 | 30 | SRI KRISHNA CO-OP-LABOUR CONTRACT AND CONST SOC LTD. | 57.32 | 55.48 | 1 | |||
| 54 | Barasat Division | Acceptance cum Work Order for Providing Functional Household Tap Connection (FHTC) from existing and new proposed distribution system within the command area of Kachua Swarupnagar Water Supply Scheme at Basirhat-II Block under Barasat Division, PHE Dte.(Phase-I). | ORD/000333/2021-2022 | 1654/BD | 07/09/2021 | 45 | UTPAL CONSTRUCTION & CO. | 86.71 | 85.64 | 1 | |||
| 55 | Barasat Division | Acceptance cum Work Order for Providing Functional Household Tap Connection (FHTC) from existing and new proposed distribution system within the command area of Mathurapur Water Supply Scheme at Basirhat-II Block under Barasat Division, PHE Dte.(Phase-I). | ORD/000334/2021-2022 | 1655/BD | 07/09/2021 | 45 | CHANCHAL ENTERPRISE & CO. | 85.87 | 83.61 | 1 | |||
| 56 | Barasat Division | Acceptance cum Work Order for Providing Functional Household Tap Connection (FHTC) from existing and new proposed distribution system within the command area of Mirzanagar Water Supply Scheme at Basirhat-II Block under Barasat Division, PHE Dte.(Phase-I). | ORD/000335/2021-2022 | 1656/BD | 07/09/2021 | 45 | CHANCHAL ENTERPRISE & CO. | 85.87 | 83.50 | 1 | |||
| 57 | Barasat Division | Acceptance cum Work Order for Providing Functional Household Tap Connection (FHTC) from existing and new proposed distribution system within the command area of Champapukuria Water Supply Scheme at Basirhat-II Block under Barasat Division, PHE Dte. (Phase-I). | ORD/000336/2021-2022 | 1651/BD | 07/09/2021 | 45 | UTPAL CONSTRUCTION & CO. | 71.61 | 70.23 | 1 | |||
| 58 | Barasat Division | Acceptance cum Work Order for Providing Functional Household Tap Connection (FHTC) from existing and new proposed distribution system within the command area of Dhopaberia Water Supply Scheme at Basirhat-II Block under Barasat Division, PHE Dte. (Phase-I). | ORD/000337/2021-2022 | 1652/BD | 07/09/2021 | 30 | UTPAL CONSTRUCTION & CO. | 53.77 | 52.68 | 1 | |||
| 59 | Barasat Division | Acceptance cum work order for Providing Functional Household Tap Connection (FHTC) in Dholkhali & Tongtala mouza including laying of UPVC/PVC pipe & supply of necessary fittings within Bouthakurani w/s scheme, Sandeshkhali-II block under Hasnabad Sub-Division, PHE Dte. | ORD/000338/2021-2022 | 1670/BD | 08/09/2021 | 30 | SRI KRISHNA CO-OP-LABOUR CONTRACT AND CONST SOC LTD. | 49.88 | 48.93 | 1 | |||
| 60 | Barasat Division | Acceptance cum work order for Providing Functional Household Tap Connection (FHTC) in diff. mouza including laying of UPVC/PVC pipe & supply of necessary fittings within Champali w/s scheme, Minakhan block under Hasnabad Sub-Division, PHE Dte. (Phase-I) | ORD/000339/2021-2022 | 1671/BD | 08/09/2021 | 45 | M/S NIRMAN CONSTRUCTION. | 77.70 | 76.48 | 1 | |||
| 61 | Barasat Division | Acceptance cum work order for Providing Functional Household Tap Connection (FHTC) in diff. mouza including laying of UPVC/PVC pipe & supply of necessary fittings within Noorpur w/s scheme, Minakhan block under Hasnabad Sub-Division, PHE Dte. (Phase-I) | ORD/000340/2021-2022 | 1672/BD | 08/09/2021 | 45 | MONDAL & CO. (BASIRHAT). | 84.12 | 82.46 | 1 | |||
| 62 | Barasat Division | Acceptance cum work order for Providing Functional Household Tap Connection(FHTC) from existing and new proposed distribution system within the command area of Raghunathpur Water Supply Scheme at Basirhat - II Block under Barasat Division, PHE Dte. (Phase - I) | ORD/000342/2021-2022 | 1673/BD | 08/09/2021 | 30 | SHIBU BISWAS. | 48.80 | 48.11 | 1 | |||
| 63 | Barasat Division | Acceptance cum Work Order for Hiring of 1(one) number vehicle of category Motor Cab/Maruti Omni(standard)(Non Air-conditioned) with Diesel/LPG/CNG Engine)[not more than 5 (five) years old] including Driver for performing the inspection works and official duties for the office of the Assistant Engineer, Barrackpore Sub-Division, P.H.E. Dte. at Barrackpore, Kolkata-700120, district- North 24Pgns, W.B. | ORD/000344/2021-2022 | 432/BKP | 27/07/2021 | 12 | GOPAL SINGHA. | 1.49 | 0.65 | 1 | |||
| 64 | Barasat Division | Acceptance cum work order for Providing Functional Household Tap Connection(FHTC) from existing and new proposed distribution system within the command area of Raharhati Water Supply Scheme at Basirhat - II Block under Barasat Division, PHE Dte. (Phase - I) | ORD/000345/2021-2022 | 1674/BD | 08/09/2021 | 30 | SRI KRISHNA CO-OP-LABOUR CONTRACT AND CONST SOC LTD. | 57.32 | 55.29 | 1 | |||
| 65 | Barasat Division | Acceptance cum work order for Providing Functional Household Tap Connection(FHTC) from existing and new proposed distribution system within the command area of Gotra Water Supply Scheme at Basirhat - I Block under Barasat Division, PHE Dte. (Phase - I). | ORD/000350/2021-2022 | 1676/BD | 08/09/2021 | 45 | M/S NIRMAN CONSTRUCTION. | 86.18 | 84.63 | 1 | |||
| 66 | Barasat Division | Repairing & renovation of Pump House No. - 1 & 2 of Deora W/S scheme within the jurisdiction of Habra Sub-Division under Barasat Division, P.H.E. Dte. | ORD/000366/2022-2023 | 389/HAB | 21/07/2022 | 30 | M/S SAMIT CHANDRA DEY. | 2.09 | 2.06 | 0 | |||
| 67 | Barasat Division | Acceptance cum work order for Laying of 90 mm dia. UPVC pipe line from Boltala Kalupara More to near Katakhali Madrasa within Hingalganj W/S Scheme (Z-I), Hingalganj block under Hasnasbad Sub-Division, P.H.E.Dte. | ORD/000377/2022-2023 | 937/HSD | 07/06/2022 | 10 | TRISHA ENTERPRISE & CO. | 3.19 | 3.19 | 1 | |||
| 68 | Barasat Division | Acceptance cum work order for Protection works for newly laid 200mm dia. UPVC pipe line at N/H/O Susanta Ghosh at Hingalganj within Hingalganj w/s scheme (Zone-I), Hingalganj block under Hasnabad Sub-Division P.H.E. Dte. | ORD/000378/2022-2023 | 935/HSD | 07/06/2022 | 10 | MONDAL & CO. (BASIRHAT). | 2.36 | 0.00 | 1 | |||
| 69 | Barasat Division | Acceptance cum work order for Laying of different dia. UPVC pipe line for damage portion due to construction of concrete road at Mamudpur Purba & Paschim para within Hingalganj W/S Scheme (Z-I), Hingalganj block under Hasnasbad Sub-Division, P.H.E.Dte. | ORD/000379/2022-2023 | 936/HSD | 07/06/2022 | 10 | MONDAL & CO. (BASIRHAT). | 3.37 | 3.37 | 1 | |||
| 70 | Barasat Division | Acceptance cum work order for Protection work for newly laid UPVC pipe line at different places of Moilobi Para in Rampur Mouza in connection with retrofitting of Rampur w/s scheme, Sandeshkhali-II block under Hasnabad Sub- Division P.H.E. Dte. | ORD/000380/2022-2023 | 1318/HSD | 02/08/2022 | 10 | R.K.MANDAL & CO. | 4.81 | 4.76 | 1 | |||
| 71 | Barasat Division | Acceptance cum work order for Protection work for newly laid UPVC pipe line at different places of Gayen para in Rampur Mouza in connection with retrofitting of Rampur w/s scheme, Sandeshkhali-II block under Hasnabad Sub- Division P.H.E. Dte. | ORD/000381/2022-2023 | 1319/HSD | 02/08/2022 | 10 | SARKAR ENTERPRISE & CO. | 3.98 | 3.97 | 1 | |||
| 72 | Barasat Division | Acceptance cum work order for Protection work for newly laid UPVC pipe line at different places of Rampur Hat khola para in Rampur Mouza in connection with retrofitting of Rampur w/s scheme, Sandeshkhali-II block under Hasnabad Sub- Division P.H.E. Dte. | ORD/000382/2022-2023 | 1320/HSD | 02/08/2022 | 10 | BARNALI DUTTA | 3.91 | 3.88 | 1 | |||
| 73 | Barasat Division | Acceptance cum work order for Protection work for newly laid UPVC pipe line at different places of Kachari para in Damakhali Mouza in connection with retrofitting of Rampur w/s scheme, Sandeshkhali-II block under Hasnabad Sub- Division P.H.E. Dte. | ORD/000383/2022-2023 | 1321/HSD | 02/09/2022 | 10 | ABDUL HAMID GAZI. | 4.05 | 4.04 | 1 | |||
| 74 | Barasat Division | Acceptance cum work order for Protection of newly laid different dia UPVC/DI pipeline by UC bullah pile at N/H/O Sibu Sardar at Boyermari Sardar para in connection with retrofitting of Chunchura w/s scheme, Sandeshkhali-I block under Hasnabad Sub- Division P.H.E. Dte. | ORD/000384/2022-2023 | 1322/HSD | 02/08/2022 | 10 | M/S ANUBHAB CONSTRUCTION. | 4.42 | 4.42 | 1 | |||
| 75 | Barasat Division | Acceptance cum work order for Protection of newly laid different dia UPVC/DI pipeline by UC bullah pile at N/H/O Sibu Gayen at Boyermari Das para in connection with retrofitting of Chunchura w/s scheme, Sandeshkhali-I block under Hasnabad Sub- Division P.H.E. Dte. | ORD/000385/2022-2023 | 1323/HSD | 02/08/2022 | 10 | M/S ANUBHAB CONSTRUCTION. | 4.50 | 4.50 | 1 | |||
| 76 | Barasat Division | Acceptance cum work order for Protection of newly laid different dia UPVC/DI pipeline by UC bullah pile at N/H/O Shibcharan Mahato, Chottu Mahato, Arabinda Mahato, Gopal Mahato & Chitta Mahato at Boyermari Mahato para in connection with retrofitting of Chunchura w/s scheme, Sandeshkhali-I block under Hasnabad Sub- Division P.H.E. Dte. | ORD/000386/2022-2023 | 1324/HSD | 02/08/2022 | 10 | KABASI ENTERPRISE. | 4.72 | 4.71 | 1 | |||
| 77 | Barasat Division | Acceptance cum work order for Protection of newly laid different dia UPVC/DI pipeline by UC bullah pile at N/H/O Sankar Pradhan, Uttam Das at Pradhan para & N/H/O Asraf Molla at Gazi para in connection with retrofitting of Chunchura w/s scheme, Sandeshkhali-I block under Hasnabad Sub- Division P.H.E. Dte. | ORD/000387/2022-2023 | 1325/HSD | 02/08/2022 | 10 | SRI KRISHNA CO-OP-LABOUR CONTRACT AND CONST SOC LTD. | 4.82 | 0.00 | 1 | |||
| 78 | Barasat Division | Acceptance cum work order for Protection of newly laid different dia UPVC/DI pipeline by UC bullah pile at N/H/O Nishith Patra, Tapas Patra at Boyermari Patra para & N/H/O Ramesh Mahato at Boyermari Mahato para in connection with retrofitting of Chunchura w/s scheme, Sandeshkhali-I block under Hasnabad Sub- Division P.H.E. Dte. | ORD/000388/2022-2023 | 1326/HSD | 02/08/2022 | 10 | SARKAR ENTERPRISE | 4.81 | 4.79 | 1 | |||
| 79 | Barasat Division | Acceptance cum work order for Protection of newly laid UPVC pipe line by bamboo pilling at N/H/O Sukumar Mahato to N/H/O Mansaram Mahato at 6 no. Boyermari in connection with retrofitting of Chunchura w/s scheme, Sandeshkhali-I block under Hasnabad Sub- Division P.H.E. Dte. | ORD/000389/2022-2023 | 1327/HSD | 02/08/2022 | 10 | M/S K.B.ENTERPRISE. | 4.52 | 4.52 | 1 | |||
| 80 | Barasat Division | Acceptance cum work order for Protection of newly laid UPVC pipe line by bamboo pilling at N/H/O Nirmal Sardar, Rohit Sardar, Naren Mali, Basudeb Mali at Boyermari Mali para & N/H/O Bablu Singh at Boyermari Choto Singh para in connection with retrofitting of Chunchura w/s scheme, Sandeshkhali-I block under Hasnabad Sub- Division P.H.E. Dte. | ORD/000390/2022-2023 | 1328/HSD | 02/08/2022 | 10 | M/S LALTI ENTERPRISE | 3.63 | 3.63 | 1 | |||
| 81 | Barasat Division | Acceptance cum work order for Emergent restoration of road for damage portion due to newly laid different dia HDPE/UPVC distribution pipe line from Molla store to Abu baktar shop at Rampur Bazaar in connection with retrofitting of Rampur w/s scheme, Sandeshkhali-II block under Hasnabad Sub-Division P.H.E. Dte. | ORD/000391/2022-2023 | 1330/HSD | 02/08/2022 | 10 | S.S.ENTERPRISE. (BAMANGACHI) | 2.60 | 2.59 | 1 | |||
| 82 | Barasat Division | Acceptance cum work order for Emergent restoration of road for damage portion due to newly laid different dia HDPE/UPVC distribution pipe line From Abu Baktar to Toto stand at Rampur Bazaar in connection with retrofitting of Rampur w/s scheme, Sandeshkhali-II block under Hasnabad Sub-Division P.H.E. Dte. | ORD/000393/2022-2023 | 1332/HSD | 02/08/2022 | 15 | S.S.ENTERPRISE. (BAMANGACHI) | 3.98 | 3.95 | 1 | |||
| 83 | Barasat Division | Acceptance cum work order for Emergent restoration by laying of 75 mm dia. HDPE distribution pipe line from PWD road to Hingalganj Police Station, PWD road to Hingalganj BDO office & BDO office to BDO quarter for damage portion in connection with retrofitting of Hingalganj w/s scheme (Z-I), Hingalganj Block under Hasnabad Sub- Division P.H.E. Dte. | ORD/000394/2022-2023 | 1333/HSD | 02/08/2022 | 15 | MONDAL & CO. (BASIRHAT). | 4.83 | 4.83 | 1 | |||
| 84 | Barasat Division | Acceptance cum work order forProtection of newly laid UPVC pipe line by bamboo pilling at different places at Agarhati mouza in connection with retrofitting of Laukhali w/s scheme, Sandeshkhali-I block under Hasnabad Sub-Division P.H.E. Dte. | ORD/000395/2022-2023 | 1334/HSD | 02/08/2022 | 10 | K.T.ENGINEERING & CO. | 4.47 | 4.46 | 1 | |||
| 85 | Barasat Division | Acceptance cum work order for Protection of newly laid UPVC pipe line by bamboo pilling at different places at Laukhali Patharghata mouza in connection with retrofitting of Laukhali w/s scheme, Sandeshkhali-I block under Hasnabad Sub-Division P.H.E. Dte. | ORD/000396/2022-2023 | 1335/HSD | 02/08/2022 | 10 | NIKHIL SAMADDAR | 4.50 | 4.48 | 1 | |||
| 86 | Barasat Division | Acceptance cum work order for Protection of newly laid UPVC pipe line by bamboo pilling near Baba Loknath Mandir, N/H/O Kalu Singh, Subrata Mondal at Rajbari Sundariakhali and other different places at Laukhali village in connection with retrofitting of Laukhali w/s scheme, Sandeshkhali-I block under Hasnabad Sub-Division P.H.E. Dte. | ORD/000397/2022-2023 | 1336/HSD | 02/08/2022 | 10 | NIKHIL SAMADDAR | 4.52 | 4.51 | 1 | |||
| 87 | Barasat Division | Acceptance cum work order for Emergent restoration by laying of 140/110/90/75 mm dia. HDPE distribution pipe line from Bankra Bazar to Rupamari more due to widening & strengthening of PWD road in connection with retrofitting of Hingalganj w/s scheme (Z-II), Hingalganj Block under Hasnabad Sub- Division P.H.E. Dte. | ORD/000398/2022-2023 | 1337/HSD | 02/08/2022 | 15 | M/S NIRMAN CONSTRUCTION. | 4.29 | 4.29 | 1 | |||
| 88 | Barasat Division | Acceptance cum work order for Emergent restoration of road for damage portion due to newly laid different dia HDPE/UPVC distribution pipe line From Khaja baba Fish arot to Mamoni Builder's at Rampur Bazaar in connection with retrofitting of Rampur w/s scheme, Sandeshkhali-II block under Hasnabad Sub-Division P.H.E. Dte. | ORD/000399/2022-2023 | 1338/HSD | 02/08/2022 | 15 | S.S.ENTERPRISE. (BAMANGACHI) | 4.17 | 4.11 | 1 | |||
| 89 | Barasat Division | Acceptance cum work order for Emergent restoration of road for damage portion due to newly laid different dia HDPE/UPVC distribution pipe line From Mamoni Builder's to Molla store at Rampur Bazaar in connection with retrofitting of Rampur w/s scheme, Sandeshkhali-II block under Hasnabad Sub-Division P.H.E. Dte. | ORD/000400/2022-2023 | 1339/HSD | 02/08/2022 | 15 | S.S.ENTERPRISE. (BAMANGACHI) | 2.97 | 2.91 | 1 | |||
| 90 | Barasat Division | Acceptance cum work order for Emergent restoration by laying of 90 mm dia. HDPE distribution pipe line from near Electric power house to Bankra Bazar due to widening & strengthening of PWD road in connection with retrofitting of Hingalganj w/s scheme (Z-I), Hingalganj Block under Hasnabad Sub- Division P.H.E. Dte. | ORD/000402/2022-2023 | 1340/HSD | 02/08/2022 | 15 | MONDAL & CO. (BASIRHAT). | 4.81 | 4.81 | 1 | |||
| 91 | Barasat Division | Acceptance cum work order for Emergent restoration by laying of 200/180/160 mm dia. HDPE distribution pipe line from Kathabari more to Rupamari more due to widening & strengthening of PWD road in connection with retrofitting of Hingalganj w/s scheme (Z-II), Hingalganj Block under Hasnabad Sub- Division P.H.E. Dte. | ORD/000403/2022-2023 | 1341/HSD | 02/08/2022 | 15 | M/S NIRMAN CONSTRUCTION. | 4.66 | 4.66 | 1 | |||
| 92 | Barasat Division | Continuation Work Order for Hiring of 1(one) number vehicle of Category Motor Cab/Maruti Omni(standard)(Non Air-Conditioned)/LPG/CNG Engine including Driver for performing the inspection works and official duties for the office of the Assistant Engineer, Barrackpore Sub-Division, P.H.E. Dte. at Barrackpore, Kolkata-700122, District- North 24Pgns, W.B.(period from 01.08.2024 to 31.01.2025) | ORD/000412/2024-2025 | 461/BKP | 12/07/2024 | 184 | GOPAL SINGHA. | 0.87 | 2.01 | 0 | |||
| 93 | Barasat Division | Acceptance cum work order for Protection work for newly laid UPVC pipe line at different places of Rampur Haldar para in Rampur Mouza in connection with retrofitting of Rampur w/s scheme, Sandeshkhali-II block under Hasnabad Sub- Division P.H.E. Dte. | ORD/000415/2022-2023 | 1347/HSD | 03/08/2022 | 10 | R.K.MANDAL & CO. | 4.88 | 4.85 | 1 | |||
| 94 | Barasat Division | Acceptance cum work order for Protection work for newly laid UPVC pipe line at different places of Rampur notun para in Rampur Mouza in connection with retrofitting of Rampur w/s scheme, Sandeshkhali-II block under Hasnabad Sub- Division P.H.E. Dte. | ORD/000416/2022-2023 | 1348/HSD | 03/08/2022 | 10 | SARKAR ENTERPRISE & CO. | 4.17 | 4.16 | 1 | |||
| 95 | Barasat Division | Acceptance cum work order for Protection work for newly laid UPVC pipe line at different places of Rampur Adibasi para in Rampur Mouza in connection with retrofitting of Rampur w/s scheme, Sandeshkhali-II block under Hasnabad Sub- Division P.H.E. Dte. | ORD/000417/2022-2023 | 1349/HSD | 03/08/2022 | 10 | R.K.MANDAL & CO. | 4.76 | 4.73 | 1 | |||
| 96 | Barasat Division | Acceptance cum work order for Protection of newly laid UPVC pipe line by bamboo pilling at different places of Boyermari Pandab para & Boyermari Gazipara in connection with retrofitting of Chunchura w/s scheme, Sandeshkhali-I block under Hasnabad Sub- Division P.H.E. Dte. | ORD/000418/2022-2023 | 1350/HSD | 03/08/2022 | 10 | ABDUL HAMID GAZI. | 4.38 | 4.35 | 1 | |||
| 97 | Barasat Division | Acceptance cum work order for Protection of newly laid different dia UPVC/DI pipeline by UC bullah pile at N/H/O Laltu Sardar at Boyermari Sardar para in connection with retrofitting of Chunchura w/s scheme, Sandeshkhali-I block under Hasnabad Sub- Division P.H.E. Dte. | ORD/000419/2022-2023 | 1351/HSD | 03/08/2022 | 10 | BASIRHAT ANCHALICK SHARAMICK THIKADARY SAMABAY SAMITY LTD. | 4.42 | 4.37 | 1 | |||
| 98 | Barasat Division | Acceptance cum work order for Protection work for newly laid UPVC pipe line at different places of Refuge para in Rampur Mouza in connection with retrofitting of Rampur w/s scheme, Sandeshkhali-II block under Hasnabad Sub- Division P.H.E. Dte. | ORD/000420/2022-2023 | 1352/HSD | 03/08/2022 | 10 | R.K.MANDAL & CO. | 4.33 | 4.29 | 1 | |||
| 99 | Barasat Division | Acceptance cum work order for Protection work for newly laid UPVC pipe line at different places of Arsad Miya Bazaar in Dhamakhali Mouza in connection with retrofitting of Rampur w/s scheme, Sandeshkhali-II block under Hasnabad Sub- Division P.H.E. Dte. | ORD/000421/2022-2023 | 1353/HSD | 03/08/2022 | 10 | SARKAR ENTERPRISE & CO. | 4.73 | 4.56 | 1 | |||
| 100 | Barasat Division | Acceptance cum work order for Emergent restoration by laying of 160/110 mm dia. HDPE distribution pipe line from near SBI bank to Bankra Bazar due to widening & strengthening of PWD road in connection with retrofitting of Hingalganj w/s scheme (Z-I), Hingalganj Block under Hasnabad Sub- Division P.H.E. Dte. | ORD/000423/2022-2023 | 1355/HSD | 03/08/2022 | 15 | MONDAL & CO. (BASIRHAT). | 4.74 | 4.74 | 1 | |||
| 101 | Barasat Division | Acceptance cum work order for Emergent restoration of existing household tap connection at different places due to widening of PWD road from Bankra Bazar to Rupamari more in connection with retrofitting of Hingalganj w/s Scheme (Zone-II), Hingalganj block under Hasnasbad Sub-Division, P.H.E.Dte. | ORD/000428/2022-2023 | 1356/HSD | 03/08/2022 | 15 | M/S NIRMAN CONSTRUCTION. | 2.90 | 2.90 | 1 | |||
| 102 | Barasat Division | Acceptance cum work order for Emergent restoration of existing household tap connection at different places due to widening of PWD road from Boltala to Bankra Bazar in connection with retrofitting of Hingalganj w/s Scheme (Zone-I), Hingalganj block under Hasnasbad Sub-Division, P.H.E.Dte. | ORD/000431/2022-2023 | 1357/HSD | 03/08/2022 | 15 | MONDAL & CO. (BASIRHAT). | 4.64 | 4.64 | 1 | |||
| 103 | Barasat Division | Acceptance cum work order for Emergent restoration of different dia UPVC pipe line for damage portion at different places due widening of PWD road of Hingalganj w/s Scheme (Zone-II), Hingalganj block under Hasnasbad Sub-Division, P.H.E.Dte. | ORD/000432/2022-2023 | 1358/HSD | 03/08/2022 | 15 | M/S NIRMAN CONSTRUCTION. | 4.90 | 4.90 | 1 | |||
| 104 | Barasat Division | Acceptance cum work order for Protection work for newly laid UPVC pipe line at different places of Paschim Dhamakhali pramanik para in Damakhali Mouza in connection with retrofitting of Rampur w/s scheme, Sandeshkhali-II block under Hasnabad Sub- Division P.H.E. Dte. | ORD/000433/2022-2023 | 1359/HSD | 03/08/2022 | 10 | RAJPATH ENGINEERS-CO-OPERATIVE SOCIETY LTD. | 4.02 | 4.01 | 1 | |||
| 105 | Barasat Division | Acceptance cum work order for Protection work for newly laid UPVC pipe line at different places of Purba dhamakhali pramanik para in Dhamakhali Mouza in connection with retrofitting of Rampur w/s scheme, Sandeshkhali-II block under Hasnabad Sub- Division P.H.E. Dte. | ORD/000434/2022-2023 | 1360/HSD | 03/08/2022 | 10 | SRI KRISHNA CO-OP-LABOUR CONTRACT AND CONST SOC LTD. | 4.81 | 4.76 | 1 | |||
| 106 | Barasat Division | Acceptance cum work order for Protection work for newly laid UPVC pipe line at different places of samanta Para in Rampur Mouza in connection with retrofitting of Rampur w/s scheme, Sandeshkhali-II block under Hasnabad SubDivision P.H.E. Dte | ORD/000446/2022-2023 | 1317/HSD | 02/08/2022 | 10 | MUKHERJEE CONSTRUCTION | 4.85 | 4.85 | 1 | |||
| 107 | Barasat Division | Acceptance cum work order for Protection work for newly laid UPVC pipe line at different places of Ghoja para in Damakhali Mouza in connection with retrofitting of Rampur w/s scheme, Sandeshkhali-II block under Hasnabad Sub- Division P.H.E. Dte. | ORD/000466/2022-2023 | 1391/HSD | 08/08/2022 | 10 | SRI KRISHNA CO-OP-LABOUR CONTRACT AND CONST SOC LTD. | 4.26 | 4.21 | 1 | |||
| 108 | Barasat Division | Acceptance cum work order for Protection work for newly laid UPVC pipe line at different places of Mistiri para in Damakhali Mouza in connection with retrofitting of Rampur w/s scheme, Sandeshkhali-II block under Hasnabad Sub- Division P.H.E. Dte. | ORD/000467/2022-2023 | 1392/HSD | 08/08/2022 | 10 | M/S R.B.S.ENTERPRISE. | 4.13 | 4.12 | 1 | |||
| 109 | Barasat Division | Acceptance cum work order for Protection work for newly laid UPVC pipe line at different places of 50 Bigha More in Damakhali Mouza in connection with retrofitting of Rampur w/s scheme, Sandeshkhali-II block under Hasnabad Sub- Division P.H.E. Dte. | ORD/000469/2022-2023 | 1394/HSD | 08/08/2022 | 10 | M/S B.K.ENTERPRISE. | 4.09 | 4.08 | 1 | |||
| 110 | Barasat Division | Acceptance cum work order for Emergent restoration of road for damage portion due to newly laid different dia DI/UPVC distribution pipe line at different places in Chunchura mouza in connection with retrofitting of Chunchura w/s scheme, Sandeshkhali-I block under Hasnabad Sub-Division P.H.E. Dte. | ORD/000473/2022-2023 | 1398/HSD | 08/08/2022 | 15 | ABDUL ALIM MONDAL. | 4.80 | 4.80 | 1 | |||
| 111 | Barasat Division | Acceptance cum work order for Repairing of Pump House No.-2 within Hingalganj w/s scheme (Old), Hingalgan block under Hasnabad Sub-Division P.H.E. Dte. | ORD/000474/2022-2023 | 1399/HSD | 08/08/2022 | 21 | RAJPATH ENGINEERS-CO-OPERATIVE SOCIETY LTD. | 3.46 | 3.46 | 1 | |||
| 112 | Barasat Division | Acceptance cum Work Order for Providing Functional Household Tap Connection (FHTC) in different mouza including laying of UPVC/PVC pipe & supply of necessary fittings within Boyermari Abad Water Supply scheme Sandeshkhali-I Block under Hasnabad Sub-Division, PHE Dte.(Phase-I) | ORD/000477/2021-2022 | 1738/BD | 14/09/2021 | 45 | DEBAPRASAD MONDAL. | 81.09 | 78.93 | 1 | |||
| 113 | Barasat Division | Acceptance cum work order for Construction of boundary wall for damaged portion at PH No-2 within Hingalganj w/s scheme (Old), Hingalganj block under Hasnabad Sub-Division P.H.E. Dte. | ORD/000477/2022-2023 | 1402/HSD | 08/08/2022 | 21 | M/S RAJPATH CONSTRUCTION. | 3.62 | 3.61 | 1 | |||
| 114 | Barasat Division | Acceptance cum work order for Emergent restoration of road for damage portion due to newly laid different dia DI/UPVC distribution pipe line at different places within Boyermari mouza in connection with retrofitting of Chunchura w/s scheme, Sandeshkhali-I block under Hasnabad Sub-Division P.H.E. Dte. | ORD/000479/2022-2023 | 1404/HSD | 08/08/2022 | 15 | M/S RAJPATH CONSTRUCTION. | 4.78 | 4.78 | 1 | |||
| 115 | Barasat Division | Acceptance cum Work Order for Providing Functional Household Tap Connection (FHTC) in different mouza including laying of UPVC/PVC pipe & supply of necessary fittings within Durgamandop Water Supply scheme Sandeshkhali-II Block under Hasnabad Sub-Division, PHE Dte.(Phase-I). | ORD/000481/2021-2022 | 1739/BD | 14/09/2021 | 45 | M/S B.K.ENTERPRISE. | 77.69 | 77.60 | 1 | |||
| 116 | Barasat Division | Acceptance cum Work Order for Providing Functional Household Tap Connection (FHTC) in different mouza including laying of UPVC/PVC pipe & supply of necessary fittings within Khulna Bhandarkhali (Zone-I) Water Supply scheme Sandeshkhali-I Block under Hasnabad Sub-Division, PHE Dte.(Phase-I) | ORD/000482/2021-2022 | 1740/BD | 14/09/2021 | 45 | M/S B.K.ENTERPRISE. | 76.95 | 76.79 | 1 | |||
| 117 | Barasat Division | Acceptance cum Work Order for Providing Functional Household Tap Connection (FHTC) in different mouza including laying of UPVC/PVC pipe & supply of necessary fittings within Korakati Water Supply scheme Sandeshkhali-II Block under Hasnabad Sub-Division, PHE Dte.(Phase-I) | ORD/000483/2021-2022 | 1741/BD | 14/09/2021 | 45 | R.K.MANDAL AND CO. | 76.55 | 76.55 | 1 | |||
| 118 | Barasat Division | Acceptance cum work order for Protection work for newly laid different dia. UPVC/DI distribution pipeline at different places in Bayermari Mouza of Chunchura w/s scheme, Sandeshkhali-I block under Hasnabad Sub-Division P.H.E. Dte. | ORD/000487/2022-2023 | 2368/BD | 10/08/2022 | 30 | SRI KRISHNA CO-OP-LABOUR CONTRACT AND CONST SOC LTD. | 60.68 | 60.66 | 1 | |||
| 119 | Barasat Division | Laying of UPVC pipe line at village Khudramangalgathi in connection with FHTC work under Sohai Swetpur Zone-I Water Supply Scheme within Barasat Sub Division, P.H.E.Dte. Sl.-1 | ORD/000491/2022-2023 | 309/BSD | 11/04/2022 | 7 | RAKESH ENTERPRISE. | 4.50 | 4.50 | 1 | |||
| 120 | Barasat Division | Laying of UPVC pipe line at Culvert More towards Khudramangalgathi in connection with FHTC work under Sohai Swetpur Zone-I Water Supply Scheme within Barasat Sub Division, P.H.E.Dte. Sl. No.-02 | ORD/000494/2022-2023 | 310/BSD | 11/04/2022 | 7 | RAKESH ENTERPRISE. | 4.27 | 4.27 | 1 | |||
| 121 | Barasat Division | Road restoration work at Kalitala More to Pump House no.-1 via Swetpur Bazar in connection with laying of distribution system of pipe line with Sohai Swetpur Water Supply Scheme Zone-I under Barasat Sub Division, P.H.E.Dte. Sl. No.-07 | ORD/000497/2022-2023 | 336/BSD | 12/04/2022 | 7 | SUN ENTERPRISE. | 4.58 | 4.58 | 1 | |||
| 122 | Barasat Division | Road restoration work at Pump House no.-1 to Mirjapur High School via Pump House No.-2 in connection with laying of distribution system of pipe line with Sohai Swetpur Water Supply Scheme Zone-I under Barasat Sub Division, P.H.E.Dte. Sl. No.-08 | ORD/000498/2022-2023 | 337/BSD | 12/04/2022 | 7 | SUN ENTERPRISE. | 4.55 | 4.55 | 1 | |||
| 123 | Barasat Division | Acceptance cum work order for Special Repair & Maintenance of Rising main & Distribution system (CI/DI/UPVC) for Hingalganj Mouza within Hingalganj w/s Scheme (Zone-I), Hingalganj block under Hasnabad Sub-Division, P.H.E. Dte. | ORD/000539/2021-2022 | 1644/HSD | 05/10/2021 | 15 | MONDAL & CO. (BASIRHAT). | 2.59 | 2.58 | 0 | |||
| 124 | Barasat Division | Acceptance cum work order for Special Repair & Maintenance of Rising main & Distribution system (CI/DI/UPVC) for Mamudpur Mouza within Hingalganj w/s Scheme (Zone-I), Hingalganj block under Hasnabad Sub-Division, P.H.E. Dte. | ORD/000540/2021-2022 | 1645/HSD | 05/10/2021 | 15 | TRISHA ENTERPRISE & CO. | 2.54 | 2.53 | 0 | |||
| 125 | Barasat Division | Acceptance cum work order for OHR connection with distribution main including Laying of balance laying work of rising main and distribution pipe line within Hingalganj water supply scheme (Zone-I), Hingalganj Block under Hasnabad Sub-Division, P.H.E. Dte. | ORD/000541/2021-2022 | 1646/HSD | 05/10/2021 | 15 | ANKUSH CONSTRUCTION & CO. | 4.51 | 4.48 | 0 | |||
| 126 | Barasat Division | Acceptance cum work order for Additional Land development at Pump House No.-1 (New site) within Sultanpur w/s scheme, Minakhan Block under Hasnabad Sub-Division P.H.E. Dte. | ORD/000542/2021-2022 | 1647/HSD | 05/10/2021 | 10 | SRI KRISHNA CO-OP-LABOUR CONTRACT AND CONST SOC LTD. | 1.14 | 1.14 | 0 | |||
| 127 | Barasat Division | Acceptance cum work order for Laying of 150 mm dia. DI rising main from Pump House No-2 to Pump House No.-1 (New site) within Sultanpur w/s scheme, Minakhan Block under Hasnabad Sub- Division P.H.E. Dte. | ORD/000543/2021-2022 | 1648/HSD | 05/10/2021 | 10 | R.K.MANDAL AND CO. | 1.20 | 1.18 | 0 | |||
| 128 | Barasat Division | Acceptance cum work order for Additional Functional Household Tap Connection (FHTC) in Paitkelpota & Paitkelpota Abad mouza including laying of UPVC/PVC pipe & supply of necessary fittings Sultanpur w/s scheme, Minakhan block under Hasnabad Sub-Division, PHE Dte. | ORD/000544/2021-2022 | 1649/HSD | 05/10/2021 | 15 | MONDAL & CO. (BASIRHAT). | 1.90 | 1.90 | 0 | |||
| 129 | Barasat Division | Acceptance cum work order for Additional Functional Household Tap Connection (FHTC) in Joykrisnapur mouza including laying of UPVC/PVC pipe & supply of necessary fittings Sultanpur w/s scheme, Minakhan block under Hasnabad Sub-Division, PHE Dte. | ORD/000547/2021-2022 | 1652/HSD | 05/10/2021 | 15 | MONDAL & CO. (BASIRHAT). | 3.04 | 3.04 | 0 | |||
| 130 | Barasat Division | Acceptance cum work order for Restoration of pipeline by withdrawn & relaying of different dia. UPVC pipe line for extra widening of PWD road from Ghoshpara More to Sri Chaitanya Math within Hingalganj W/S Scheme (Zone-I), Hingalganj block under Hasnasbad Sub-Division, P.H.E.Dte. | ORD/000548/2021-2022 | 1653/HSD | 05/10/2021 | 15 | MONDAL & CO. (BASIRHAT). | 4.61 | 4.60 | 0 | |||
| 131 | Barasat Division | Acceptance cum work order for Restoration of pipeline by withdrawn & relaying of different dia. UPVC pipe line for extra widening of PWD road from Sri Chaitanya Math to Pather Dabi More within Hingalganj W/S Scheme (Zone-I), Hingalganj block under Hasnasbad Sub-Division, P.H.E.Dte. | ORD/000549/2021-2022 | 1654/HSD | 05/10/2021 | 15 | MONDAL & CO. (BASIRHAT). | 4.60 | 4.59 | 0 | |||
| 132 | Barasat Division | Acceptance cum work order for Additional Providing Functional Household Tap Connection (FHTC) in connection with Jal Jeevan Mission (JJM and Jal Swapna) under command area of Bouthakurani water supply scheme (For Bouthakurani & Tongtala Mouza) at Sandeshkhali-II block under Hasnabad Sub-Division within Barasat Division, PHE Dte. | ORD/000550/2021-2022 | 1655/HSD | 05/10/2021 | 15 | M/S B.K.ENTERPRISE. | 4.35 | 4.35 | 0 | |||
| 133 | Barasat Division | Preparation of geo-referenced GIS mapping with integrated software showing georeferenced location of Households, Piped water supply scheme and Distribution network to be incorporated into map by using both GIS & CAD software keeping the essential Technical aspect of 6 numbers scheme namely Gobindapur Dhokra, Rajnagar, Sadiknagar Zone-I, Bithari Zone-I, Bithari Zone-II and Simla Durgapur of North 24 Pgs. District under the jurisdiction of Basirhat Sub-Division. | ORD/000551/2022-2023 | 945 / BHT SD | 19/07/2022 | 15 | M/S TECHVISION. | 2.91 | 2.91 | 1 | |||
| 134 | Barasat Division | Acceptance cum work order for Emergency repairing of existing FHTC along with pipe line in connection with retrofitting work at different places of Radhanagar mouza within Chotto Sehara w/s scheme, Sandeshkhali-I block under Hasnasbad Sub-Division, P.H.E.Dte. | ORD/000552/2024-2025 | 994/HSD | 29/08/2024 | 10 | TRISHA ENTERPRISE & CO. | 0.97 | 0.97 | 100 | |||
| 135 | Barasat Division | Acceptance cum work order for Additional Emergent restoration of concrete road for damage portion at different places due to newly laid HDPE/DI pipeline within Hasnabad w/s scheme, Hasnabad block under Hasnabad Sub-Division P.H.E. Dte. | ORD/000553/2021-2022 | 1658/HSD | 05/10/2021 | 10 | SRI KRISHNA CO-OP-LABOUR CONTRACT AND CONST SOC LTD. | 2.86 | 2.86 | 0 | |||
| 136 | Barasat Division | Acceptance cum work order for Special Repair & Maintenance of Rising main & Distribution system (CI/DI/HDPE/UPVC) of Hasnabad w/s Scheme, Hasnabad block under Hasnabad Sub-Division, P.H.E. Dte. | ORD/000554/2021-2022 | 1659/HSD | 05/10/2021 | 21 | MONDAL & CO. (BASIRHAT). | 4.40 | 4.40 | 0 | |||
| 137 | Barasat Division | Acceptance cum work order for Additional land development at tube well site-3 (CWR site) within Hingalganj w/s scheme (Zone-II), Hingalganj Block under Hasnabad Sub-Division P.H.E. Dte. | ORD/000555/2021-2022 | 1660/HSD | 05/10/2021 | 10 | TRISHA ENTERPRISE & CO. | 0.92 | 0.92 | 0 | |||
| 138 | Barasat Division | Acceptance cum work order for Supply and installation of 100mm dia sluice valve in distribution pipe line for smooth supply of water at different palces within Chotto Sehara water supply scheme, Sandeshkhali-I Block under Hasnabad Sub-Division, PHE Dte. | ORD/000555/2024-2025 | 997/HSD | 29/08/2024 | 10 | TRISHA ENTERPRISE & CO. | 0.84 | 0.84 | 100 | |||
| 139 | Barasat Division | Acceptance cum work order for Additional Functional Household Tap Connection (FHTC) in Khosbas & Singerkati mouza including laying of UPVC/PVC pipe & supply of necessary fittings within Hingalganj w/s scheme (Zone-II), Hingalganj block under Hasnabad Sub-Division, PHE Dte. | ORD/000556/2021-2022 | 1661/HSD | 05/10/2021 | 10 | SRI KRISHNA CO-OP-LABOUR CONTRACT AND CONST SOC LTD. | 1.20 | 1.20 | 0 | |||
| 140 | Barasat Division | Acceptance cum work order for Supply and installation of 150mm dia sluice valve in distribution pipe line for smooth supply of water at different palces within Chotto Sehara water supply scheme, Sandeshkhali-I Block under Hasnabad Sub-Division, PHE Dte. | ORD/000557/2024-2025 | 999/HSD | 29/08/2024 | 10 | TRISHA ENTERPRISE & CO. | 0.97 | 0.97 | 100 | |||
| 141 | Barasat Division | Acceptance cum work order for Supply of different dia. Sluice Valve & construction of different dia. Sluice Valve chamber at different places within Hingalganj w/s scheme (Zone-I), Hingalganj Block under Hasnabad Sub- Division P.H.E. Dte. | ORD/000558/2021-2022 | 1663/HSD | 05/10/2021 | 10 | MONDAL & CO. (BASIRHAT). | 4.88 | 4.88 | 0 | |||
| 142 | Barasat Division | Acceptance cum work order for Supply and installation of 200mm dia sluice valve in distribution pipe line for smooth supply of water at different palces within Chotto Sehara water supply scheme, Sandeshkhali-I Block under Hasnabad Sub-Division, PHE Dte. | ORD/000559/2024-2025 | 1001/HSD | 29/08/2024 | 10 | TRISHA ENTERPRISE & CO. | 0.97 | 0.97 | 100 | |||
| 143 | Barasat Division | Acceptance cum work order for Additional Functional Household Tap Connection (FHTC) in Radhanagar mouza including laying of UPVC/PVC pipe & supply of necessary fittings within Chotto Sehara w/s scheme Sandeshkhali-I block under Hasnabad Sub-Division, PHE Dte. | ORD/000560/2021-2022 | 1665/HSD | 05/10/2021 | 10 | TRISHA ENTERPRISE & CO. | 3.56 | 3.56 | 0 | |||
| 144 | Barasat Division | Acceptance cum work order for Providing Functional Household Tap Connection(FHTC) from existing and new proposed distribution system within the command area of Joypur Gopmahal Water Supply Scheme at Basirhat - II Block under Barasat Division, PHE Dte. (Phase II) | ORD/000563/2021-2022 | 1951/BD | 08/10/2021 | 15 | SHIBU BISWAS. | 21.73 | 20.05 | 1 | |||
| 145 | Barasat Division | Acceptance cum work order for Providing Functional Household Tap Connection(FHTC) from existing and new proposed distribution system within the command area of Sadiknagar Zone-II Water Supply Scheme at Basirhat - II Block under Barasat Division, PHE Dte. (Phase II) | ORD/000564/2021-2022 | 1952/BD | 08/10/2021 | 30 | SUDHAMAY MAJUMDAR. | 58.36 | 53.39 | 1 | |||
| 146 | Barasat Division | Acceptance cum work order for Providing Functional Household Tap Connection(FHTC) from existing and new proposed distribution system within the command area of Kulia Piped water Supply Scheme at Baduria Block under Barasat Division, PHE Dte. (Phase II) | ORD/000566/2021-2022 | 1953/BD | 08/10/2021 | 15 | B.S.ENTERPRISE. (BASIRHAT) | 21.69 | 21.27 | 1 | |||
| 147 | Barasat Division | Acceptance cum work order for Providing Functional Household Tap Connection(FHTC) from existing and new proposed distribution system within the command area of Dobila Piped Water Supply Scheme at Swarupnagar Block under Barasat Division, PHE Dte. (Phase II) | ORD/000567/2021-2022 | 1954/BD | 08/10/2021 | 15 | M/S SUKANTA ENTERPRISE. | 14.73 | 13.84 | 1 | |||
| 148 | Barasat Division | Acceptance cum work order for Providing Functional Household Tap Connection(FHTC) from existing and new proposed distribution system within the command area of Dakshin Bagundi piped Water Supply Scheme at Basirhat -I Block under Barasat Division, PHE Dte. (Phase II) | ORD/000568/2021-2022 | 1955/BD | 08/10/2021 | 15 | DEY & CO. | 16.50 | 14.77 | 1 | |||
| 149 | Barasat Division | Acceptance cum work order for Providing Functional Household Tap Connection(FHTC) from existing and new proposed distribution system within the command area of Akipur Water Supply Scheme at Basirhat - II Block under Barasat Division, PHE Dte. (Phase II) | ORD/000569/2021-2022 | 1956/BD | 08/10/2021 | 30 | BANERJEE CONSTRUCTION. | 58.26 | 53.25 | 1 | |||
| 150 | Barasat Division | Renovation and repairing of Boundary wall at 2nd T/W site for Augmentation of Sindrani (Zone-I) Water Supply Scheme within the jurisdiction of Bongaon Sub-Division under Barasat Division, P.H.E. Dte. | ORD/000570/2023-2024 | 616/Bon | 08/08/2023 | 21 | VAI ENTERPRISE. | 1.86 | 1.83 | 100 | |||
| 151 | Barasat Division | Formal Work Order for Providing Functional Household Tap Connection(FHTC) from existing and new proposed distribution system within the command area of Bara Bankra Water Supply Scheme at Swarupnagar Block under Barasat Division, PHE.(Phase-I). | ORD/000573/2021-2022 | 1974/BD | 26/10/2021 | 90 | PUSPA ENTERPRISE. | 192.09 | 179.40 | 1 | |||
| 152 | Barasat Division | Acceptance cum work order for Temporary approach road for movement of winch machine and other allied machineries at Head Work site within Kanmari W/S scheme (Z-I), Sandeshkhali-I block under Hasnabad Sub-Division P.H.E. Dte. | ORD/000573/2024-2025 | 1117/HSD | 19/09/2024 | 10 | TRISHA ENTERPRISE & CO. | 0.90 | 0.90 | 100 | |||
| 153 | Barasat Division | Fomal work order for Providing Functional Household Tap Connection (FHTC) in connection with Jal Jeevan Mission (JJM and JAL SWAPNA) under command area of Kshudra Mangalgathi, Mirzzapur, Swetpur, Daibagnapol, Mongal Nagar, Noajispur, Bajitnagar, Mobarakpur & Bara Bisweswarpur mouzas (Part) within Sohai Swetpur Zone-I Water Supply Scheme at Deganga Block under Barasat Division, PHE Dte. Part-A Phase-I | ORD/000574/2021-2022 | 1975/BD | 26/10/2021 | 90 | H.I.ENTERPRISE. | 225.34 | 210.13 | 1 | |||
| 154 | Barasat Division | Acceptance cum work order for Protection of UPVC rising main by UC bullah pile at Joygram Fisheries for Rejuvenation of Kumarjole w/s scheme, Minakhan block under Hasnabad Sub-Division P.H.E. Dte. | ORD/000585/2021-2022 | 1851/HSD | 17/11/2021 | 15 | ABDUL ALIM MONDAL. | 3.36 | 3.34 | 1 | |||
| 155 | Barasat Division | Laying of distribution pipe line for smoothly water supply all over back site villagers and other allied works at Koniara water supply scheme under Bongaon Sub-Division P.H.E.Dte. | ORD/000587/2022-2023 | 404/Bon | 23/08/2022 | 15 | ROY CHOWDHURY CONSTRUCTION. | 3.49 | 3.47 | 1 | |||
| 156 | Barasat Division | Acceptance cum work order for Emergency repairing of existing FHTC along with pipe line in connection with retrofitting work at different places of Chotto Sehara mouza within Chotto Sehara w/s scheme, Sandeshkhali-I block under Hasnasbad Sub-Division, P.H.E.Dte. | ORD/000587/2024-2025 | 1172/HSD | 26/09/2024 | 10 | TRISHA ENTERPRISE & CO. | 0.97 | 0.97 | 100 | |||
| 157 | Barasat Division | Acceptance cum work order for Providing Functional Household Tap Connection (FHTC) in connection with Jal Jeevan Mission (JJM and JAL SWAPNA) under command area of Banspol, Dariala & Birpur mouzas within Humaipur Water Supply Scheme at Barasat-II Block under Barasat Sub Division, PHE Dte. | ORD/000591/2022-2023 | 2626/BD | 05/09/2022 | 30 | M/S K.B.ENTERPRISE. | 43.06 | 38.98 | 1 | |||
| 158 | Barasat Division | Acceptance cum work order for Providing Functional Household Tap Connection (FHTC) in connection with Jal Jeevan Mission (JJM and JAL SWAPNA) under command area of SADPUR Water Supply Scheme at Habra - I Block within the jurisdiction of Habra Sub-Division, under Barasat Division, P.H.E. Dte. (Phase - I) | ORD/000592/2022-2023 | 2627/BD | 05/09/2022 | 660 | M/S SUKANTA ENTERPRISE. | 48.49 | 26.76 | 100 | |||
| 159 | Barasat Division | Acceptance cum Work Order for Hiring of 1(one) number vehicle of category Motor Cab/Maruti Omni(standard)(Non Air-conditioned) with Diesel/LPG/CNG Engine)[not more than 5 (five) years old] including Driver for performing the inspection works and official duties for the office of the Assistant Engineer, Barrackpore Sub-Division, P.H.E. Dte. at Barrackpore, Kolkata-700122, district- North 24Pgns, W.B. | ORD/000594/2022-2023 | 158/BKP | 29/07/2022 | 365 | GOPAL SINGHA. | 1.73 | 3.93 | 1 | |||
| 160 | Barasat Division | Continuation work order for Hiring 1(one) no. Diesel Luxary Car on daily basis (for 01.09.2022 to 31.12.2022) for office use of the Assistant Engineer, R.W.S Barasat Sub-Division, P.H.E. Dte. | ORD/000598/2022-2023 | 641/BST | 31/08/2022 | 122 | DEBAPRASAD MONDAL. | 0.58 | 0.93 | 1 | |||
| 161 | Barasat Division | Hiring 1(one) no. Diesel Luxary Car on daily basis (for 01.09.2021 to 31.08.2022) for office use of the Assistant Engineer, R.W.S, Barasat Sub- Division, P.H.E. Dte. | ORD/000601/2021-2022 | 447/BST | 25/08/2021 | 365 | DEBAPRASAD MONDAL. | 1.72 | 1.31 | 1 | |||
| 162 | Barasat Division | Acceptance cum work order for Protection of newly laid different dia UPVC/DI pipeline by UC bullah pile at N/H/O Sankar Pradhan, Uttam Das at Pradhan para & N/H/O Asraf Molla at Gazi para in connection with retrofitting of Chunchura w/s scheme, Sandeshkhali-I block under Hasnabad Sub- Division P.H.E. Dte. | ORD/000620/2022-2023 | 1325/HSD | 02/08/2022 | 10 | SRI KRISHNA CO-OP-LABOUR CONTRACT AND CONST SOC LTD. | 4.82 | 4.81 | 1 | |||
| 163 | Barasat Division | Repairing & Renovation of Head Work Pump House site and allied works at Helencha water supply scheme under Bongaon Sub-Division, P.H.E.Dte. | ORD/000624/2022-2023 | 409/Bon | 23/08/2022 | 12 | KAMAL HALDAR. | 3.00 | 2.96 | 1 | |||
| 164 | Barasat Division | Formal Work Order for Providing Functional Household Tap Connection (FHTC) in connection with Jal Jeevan Mission (JJM and JAL SWAPNA) under command area of Dangatangatangi, Bodai, Sonadanga, Kamdebpur, Mirhati, Mathura, Durlavpur & Belu mouzas (Part) within Bodai Zone-I Water Supply Scheme at Amdanga Block under Barasat Division, PHE Dte. Part-A Phase-I | ORD/000630/2021-2022 | 2145/BD | 12/11/2021 | 90 | UMWELT ENGINEER PVT.LTD. | 222.53 | 201.49 | 1 | |||
| 165 | Barasat Division | Construction of Approach Road Head Work at site for Augmentation of Sindrani (Zone-I) Water Supply Scheme within the jurisdiction of Bongaon Sub-Division under Barasat Division, P.H.E. Dte. | ORD/000635/2023-2024 | 618/Bon | 08/08/2023 | 25 | ROY ENGINEERS. | 4.51 | 4.51 | 100 | |||
| 166 | Barasat Division | Construction of Approach Road Head Work at site for Augmentation of Gangrapota Water Supply Scheme within the jurisdiction of Bongaon Sub-Division under Barasat Division, P.H.E. Dte. | ORD/000636/2023-2024 | 619/BON | 08/08/2023 | 20 | MA CONSTRUCTION. | 3.98 | 3.95 | 100 | |||
| 167 | Barasat Division | Formal Work Order for Providing Functional Household Tap Connection (FHTC) in connection with Jal Jeevan Mission (JJM and Jal Swapna) under command area of Gaighata Water Supply Scheme at Gaighata Block within the jurisdiction of Habra Sub-Division under Barasat Division, PHE Dte. (Phase-I). | ORD/000642/2021-2022 | 2174/BD | 18/11/2021 | 90 | SINGHA ROY & CO. | 133.93 | 129.03 | 1 | |||
| 168 | Barasat Division | Formal Work Order for Providing Functional Household Tap Connection (FHTC) in connection with Jal Jeevan Mission (JJM and Jal Swapna) under command area of Gangrapota Water Supply Scheme at Bongaon Block under Barasat Division, PHE Dte. (Phase-I). | ORD/000643/2021-2022 | 2175/BD | 18/11/2021 | 90 | AMIT KUMAR BOSE. | 167.22 | 159.23 | 1 | |||
| 169 | Barasat Division | Construction of Boundary wall at 2nd Pump House site for Augmentation of Gangrapota Water Supply Scheme within the jurisdiction of Bongaon Sub-Division under Barasat Division, P.H.E. Dte. | ORD/000643/2023-2024 | 614/Bon | 08/08/2023 | 21 | A.D.ENTERPRISE. | 3.66 | 0.00 | 0 | |||
| 170 | Barasat Division | Acceptance cum work order for Construction of 300 cum capacity 20 mtr. staging height R.C.C. Over Head Water Reservoir as per Departmental design, drawing and specification including bored pile & pile cap at Rajbari water supply scheme, Sandeshkhali-I block under Hasnabad Sub-Division, PHE Dte. | ORD/000664/2022-2023 | 1152/ BD | 12/04/2022 | 240 | S.S.ENTERPRISE. (BAMANGACHI) | 97.05 | 18.73 | 0 | |||
| 171 | Barasat Division | Work order for Providing Functional Household Tap Connection (FHTC) to the uncovered household as well as convert the Bermajur mouza into Swajal Gram i/c laying of UPVC/PVC pipe & supply of necessary fittings within Bermajur w/s scheme, Sandeshkhali-II block under Hasnabad Sub-Division, PHE Dte. | ORD/000665/2022-2023 | 2920/BD | 26/09/2022 | 30 | UNIFIED ENGINEERS' CO-OPERATIVE SOCIETYLTD. | 24.18 | 24.16 | 1 | |||
| 172 | Barasat Division | Work order for Providing Functional Household Tap Connection (FHTC) to the uncovered household as well as convert the Sehara Radhanagar mouza into Swajal Gram i/c laying of UPVC/PVC pipe & supply of necessary fittings within Chotto Sehara w/s scheme, Sandeshkhali-I block under Hasnabad Sub-Division, PHE Dte. | ORD/000666/2022-2023 | 2921/BD | 26/09/2022 | 30 | TRISHA ENTERPRISE & CO. | 24.00 | 23.99 | 1 | |||
| 173 | Barasat Division | Work order for Providing Functional Household Tap Connection (FHTC) to the uncovered household as well as convert the different mouza into Swajal Gram i/c laying of UPVC/PVC pipe & supply of necessary fittings within Hingalganj w/s scheme (Z-II), Hingalganj block under Hasnabad Sub-Division, PHE Dte. | ORD/000667/2022-2023 | 2922/BD | 26/09/2022 | 30 | M/S RAJPATH CONSTRUCTION. | 11.95 | 11.94 | 1 | |||
| 174 | Barasat Division | Work order for Providing Functional Household Tap Connection (FHTC) to the uncovered household as well as convert the Rajbari mouza into Swajal Gram i/c laying of UPVC/PVC pipe & supply of necessary fittings within Rajbari w/s scheme, Sandeshkhali-I block under Hasnabad Sub-Division, PHE Dte. | ORD/000668/2022-2023 | 2923/BD | 26/09/2022 | 30 | ABDUL HAMID GAZI. | 11.33 | 11.32 | 1 | |||
| 175 | Barasat Division | Formal Work Order for Providing Functional Household Tap Connection (FHTC) from existing and new proposed distribution system within the command area of Bajitur Zone-II Water Supply Scheme at Baduria Block, Dist- North 24 Parganas under Barasat Division, PHE Dte.(Phase-I) | ORD/000670/2021-2022 | 2269/BD/BD | 26/11/2021 | 90 | ORIENT CONSTRUCTION. | 128.44 | 114.35 | 1 | |||
| 176 | Barasat Division | Acceptance cum work order for Protection Emergent restoration of concrete road for damage portion at different places for providing FHTC within Kumarjole w/s scheme, Minakhan block under Hasnabad Sub-Division P.H.E. Dte. | ORD/000696/2021-2022 | 1984/HSD | 02/12/2021 | 7 | ABDUL ALIM MONDAL. | 2.46 | 2.46 | 1 | |||
| 177 | Barasat Division | Acceptance cum work order for Emergent restoration of concrete road for damage portion at different places due to laying of new DI/UPVC pipe line in Champali mouza within Champali w/s scheme, Minakhan block under Hasnabad Sub-Division P.H.E. Dte. | ORD/000699/2021-2022 | 1987/HSD | 02/12/2021 | 7 | S.K.ENTERPRISE. | 2.44 | 2.44 | 1 | |||
| 178 | Barasat Division | Acceptance cum work order for Emergent restoration of concrete road for damage portion at different places for providing FHTC in Noorpur/Bokchara mouza within Noorpur w/s scheme, Minakhan block under Hasnabad Sub-Division P.H.E. Dte. | ORD/000701/2021-2022 | 1989/HSD | 02/12/2021 | 7 | MONDAL & CO. (BASIRHAT). | 1.63 | 1.63 | 1 | |||
| 179 | Barasat Division | Acceptance cum work order for Protection of newly laid DI/UPVC pipe line by UC bullah pile at different places in Champali mouza within Champali w/s scheme, Minakhan block under Hasnabad Sub- Division P.H.E. Dte. | ORD/000703/2021-2022 | 1991/HSD | 02/12/2021 | 10 | M/S NIRMAN CONSTRUCTION. | 4.38 | 4.38 | 1 | |||
| 180 | Barasat Division | Acceptance cum work order for Restoration of existing concrete road for damaged portion due to movement of heavy vehicles during construction of OHR at Bermajur H.W. site within Bermajur w/s scheme, Sandeshkhali-II block under Hasnabad Sub- Division P.H.E. Dte. (Part-A) | ORD/000704/2021-2022 | 1992/HSD | 02/12/2021 | 15 | UNIFIED ENGINEERS' CO-OPERATIVE SOCIETYLTD. | 4.40 | 4.39 | 1 | |||
| 181 | Barasat Division | Acceptance cum work order for Restoration of existing concrete road for damaged portion due to movement of heavy vehicles during construction of OHR at Bermajur H.W. site within Bermajur w/s scheme, Sandeshkhali-II block under Hasnabad Sub- Division P.H.E. Dte. (Part-B) | ORD/000705/2021-2022 | 1993/HSD | 02/12/2021 | 15 | UNIFIED ENGINEERS' CO-OPERATIVE SOCIETYLTD. | 4.78 | 4.78 | 1 | |||
| 182 | Barasat Division | Acceptance cum work order for Emergent restoration of concrete road for damage portion at different places for providing FHTC within Bouthakurani w/s scheme, Sandeshkhali-II block under Hasnabad Sub-Division P.H.E. Dte. | ORD/000706/2021-2022 | 1994/HSD | 02/12/2021 | 7 | SRI KRISHNA CO-OP-LABOUR CONTRACT AND CONST SOC LTD. | 2.00 | 2.00 | 1 | |||
| 183 | Barasat Division | Construction of Boundary wall at 2nd T/W site for Augmentation of Krishnacandrapur Water Supply Scheme within the jurisdiction of Bongaon Sub-Division under Barasat Division, P.H.E. Dte. | ORD/000716/2023-2024 | 611/Bon | 08/08/2023 | 21 | ACHINTA KUMAR HALDER. | 4.70 | 0.00 | 0 | |||
| 184 | Barasat Division | Construction of Approach Road Head Work at site for Augmentation of Kurulia (Zone-II) Water Supply Scheme within the jurisdiction of Bongaon Sub-Division under Barasat Division, P.H.E. Dte. | ORD/000731/2023-2024 | 621/Bon | 08/08/2023 | 25 | GHOSH CONSTRUCTION. | 4.75 | 4.74 | 100 | |||
| 185 | Barasat Division | Acceptance cum Work Order for Providing Functional Household Tap Connection (FHTC) in connection with Jal Jeevan Mission (JJM and Jal Swapna) under command area of Sindrani (Zone-I) Water Supply Scheme at Bagdah Block under Barasat Division, PHE Dte. (Phase-I). | ORD/000751/2021-2022 | 2387/BD | 09/12/2021 | 45 | DEBAPRASAD MONDAL. | 73.93 | 73.41 | 1 | |||
| 186 | Barasat Division | Acceptance cum Work Order for Providing Functional Household Tap Connection (FHTC) in connection with Jal Jeevan Mission (JJM and Jal Swapna) under command area of Kankpul Water Supply Scheme at Habra-II Block within the jurisdiction of Habra Sub-Division, under Barasat Division, PHE Dte. (Phase-I). | ORD/000752/2021-2022 | 2388/BD | 09/12/2021 | 45 | S.S.ENTERPRISE. (BAMANGACHI) | 82.85 | 71.02 | 1 | |||
| 187 | Barasat Division | Acceptance cum Work Order for Providing Functional Household Tap Connection (FHTC) in connection with Jal Jeevan Mission (JJM and Jal Swapna) under command area of Janaphul Water Supply Scheme at Habra-I Block within the jurisdiction of Habra Sub-Division, under Barasat Division, PHE Dte. (Phase-I). | ORD/000753/2021-2022 | 2389/BD | 09/12/2021 | 45 | ORIENT CONSTRUCTION. | 72.42 | 67.56 | 1 | |||
| 188 | Barasat Division | Acceptance cum Work Order for Providing Functional Household Tap Connection (FHTC) in connection with Jal Jeevan Mission (JJM and Jal Swapna) under command area of Kamarpur & its adjoining mouzas Water Supply Scheme at Habra-II Block within the jurisdiction of Habra Sub-Division, under Barasat Division, PHE Dte. (Phase-I). | ORD/000754/2021-2022 | 2390/BD | 09/12/2021 | 45 | SHIBU BISWAS. | 53.39 | 50.82 | 1 | |||
| 189 | Barasat Division | Acceptance cum work order for Emergent supply, fitting & fixing of Main gate and other allied works at OHR site within Bermajur w/s scheme, Sandeshkhali-II block under Hasnabad Sub- Division P.H.E. Dte. | ORD/000756/2022-2023 | 617/HSD | 07/04/2022 | 15 | UNIFIED ENGINEERS' CO-OPERATIVE SOCIETYLTD. | 0.60 | 0.60 | 1 | |||
| 190 | Barasat Division | Acceptance cum work order for Emergent restoration of DI rising main from near Sahapur more to near OHR for damaged portion due to widening & strengthing of PWD road within Hingalganj w/s scheme (Zone-I), Hingalganj Block under Hasnabad Sub-Division P.H.E. Dte. | ORD/000757/2022-2023 | 619/HSD | 07/04/2022 | 15 | MONDAL & CO. (BASIRHAT). | 4.81 | 4.67 | 1 | |||
| 191 | Barasat Division | Acceptance cum work order for Emergent restoration of 150mm dia. DI rising main from near Kathabari more to CWR i/c CWR connection within Hingalganj w/s scheme (Zone-II), Hingalganj Block under Hasnabad Sub-Division P.H.E. Dte. | ORD/000758/2022-2023 | 620/HSD | 07/04/2022 | 15 | M/S NIRMAN CONSTRUCTION. | 3.28 | 3.28 | 1 | |||
| 192 | Barasat Division | Acceptance cum work order for Emergent restoration of pipeline by withdrawing & relaying of 90 mm dia. UPVC pipe line at different places of Rajbari W/S Scheme, Sandeshkhali-I block under Hasnasbad Sub-Division, P.H.E.Dte. | ORD/000759/2022-2023 | 621/HSD | 07/04/2022 | 15 | UNIFIED ENGINEERS' CO-OPERATIVE SOCIETYLTD. | 1.52 | 1.50 | 1 | |||
| 193 | Barasat Division | Acceptance cum work order for Emergent restoration of concrete road for damage portion at different places due to laying of new DI/UPVC pipe line within Hingalganj w/s scheme (Zone-II), Hingalganj block under Hasnabad Sub-Division P.H.E. Dte. | ORD/000760/2022-2023 | 622/HSD | 07/04/2022 | 15 | M/S NIRMAN CONSTRUCTION. | 2.34 | 0.00 | 1 | |||
| 194 | Barasat Division | Acceptance cum work order for Emergent restoration of concrete road for damage portion at different places due to laying of new DI/UPVC pipe line within Hingalganj w/s scheme (Zone-I), Hingalganj block under Hasnabad Sub-Division P.H.E. Dte. | ORD/000762/2022-2023 | 629/HSD | 08/04/2022 | 15 | MONDAL & CO. (BASIRHAT). | 2.45 | 2.45 | 1 | |||
| 195 | Barasat Division | Hiring Diesel Luxury Car on daily basis for the office use of the Assistant Engineer, Basirhat Sub-Division P.H.E. Dte. (Period 01.07.2023 to 31.12.2023 for Six Month) | ORD/000785/2023-2024 | 604/BHTSD | 28/06/2023 | 184 | DEB KUMAR DAS. | 0.87 | 1.54 | 33 | |||
| 196 | Barasat Division | Providing Functional Household Tap Connection (FHTC) in connection with Jal Jeevan Mission (JJM and JAL SWAPNA) under command area of Gopalpur Chandigarh Mouza (Part) within Humaipur Water Supply Scheme at Barasat II Block under Barasat Division, PHE Dte. Part-I Sl.No.4 | ORD/000789/2020-2021 | 171/BSD | 18/02/2021 | 14 | ANJALI ENTERPRISE. | 2.18 | 1.91 | 1 | |||
| 197 | Barasat Division | Acceptance cum work order for Sinking of Additional 1 no. 300 mm. x 200 mm. dia. 360 mtr deep Tube well by D.R. Rig method with PVC pipe & strainer having 300mm dia 48 mtr. long housing pipe & 200mm dia 30 mtr. long filter within Bhangatushkhali W/s Scheme, Sandeshkhali-II block under Hasnabad Sub-Division, P.H.E. Dte. | ORD/000793/2024-2025 | 3311/BD | 27/11/2024 | 30 | SUBHAJIT SAHA | 31.69 | 0.00 | 0 | |||
| 198 | Barasat Division | Acceptance cum work order for Sinking of Additional 1 no. 300 mm. x 200 mm. dia. 360 mtr deep Tubewell by D.R. Rig method with PVC pipe & strainer having 300mm dia 48 mtr. long housing pipe & 200mm dia 30 mtr. long filter within Jeliakhali Purbakhanda w/s scheme, Sandeshkhali-II block under Hasnabad Sub-Division, P.H.E. Dte. | ORD/000796/2024-2025 | 3314/BD | 27/11/2024 | 30 | JOY GURU ENTERPRISE | 31.69 | 0.00 | 0 | |||
| 199 | Barasat Division | Formal work order for construction of 5 nos. different capacity OHR, Land development, Construction of Office cum Guard room, Switch cum Chlorine Room, Boundary wall, Surface drain and related allied works at different Zonal Head work site including Laying Distribution System and FHTC of surface based water supply scheme for arsenic affected areas of Habra-Gaighata & adjoining mouzas in the district North 24 Parganas under Barasat Division, P.H.E. Dte. | ORD/000798/2023-2024 | 2714/BD | 05/09/2023 | 1095 | S & P ENTERPRISE | 5,112.52 | 239.90 | 40 | |||
| 200 | Barasat Division | Acceptance cum work order for Supply of sluice valve i/c Construction of Sluice valve chamber and other allied works at different location within Hingalganj w/s scheme (Zone-II), Hingalganj Block under Hasnabad Sub- Division P.H.E. Dte. | ORD/000804/2021-2022 | 1858/HSD. | 17/11/2021 | 15 | M/S NIRMAN CONSTRUCTION. | 2.96 | 2.96 | 1 | |||
| 201 | Barasat Division | Acceptance cum work order for Hiring Diesel Luxury Car on Daily basis (for 6 months from 01.10.2022 to 31.03.2023) for the office use of the Executive Engineer, Barasat Division, PHE Dte. | ORD/000805/2022-2023 | 2826/BD | 29/09/2022 | 181 | MADHAB CHANDRA DAS | 0.89 | 1.56 | 0 | |||
| 202 | Barasat Division | Acceptance cum work order for Sinking of Additional 1 no. 300 mm. x 200 mm. dia. 360 mtr deep Tubewell by D.R. Rig method with PVC pipe & strainer having 300mm dia 48 mtr. long housing pipe & 200mm dia 30 mtr. long filter within Tushkhali w/s scheme, Sandeshkhali-II block under Hasnabad Sub-Division, P.H.E. Dte. | ORD/000812/2024-2025 | 3334/BD | 28/11/2024 | 30 | UTPAL CONSTRUCTION & CO. | 31.69 | 0.00 | 0 | |||
| 203 | Barasat Division | Formal Work Order for Providing Functional Household Tap Connection (FHTC) in connection with Jal Jeevan Mission (JJM and Jal Swapna) under command area of Maslandapur Water Supply Scheme(Zone-I) at Habra-I Block within the jurisdiction of Habra Sub-Division, under Barasat Division, PHE Dte. (Phase-I). | ORD/000816/2021-2022 | 2436/BD | 13/12/2021 | 90 | SUPRITI ENTERPRISE. | 113.29 | 109.24 | 1 | |||
| 204 | Barasat Division | Formal Work Order for Providing Functional Household Tap Connection (FHTC) from existing and new proposed distribution system within the command area of Arsula Water Supply Scheme at Baduria Block under Barasat Division, PHE Dte.(Phase-I) | ORD/000817/2021-2022 | 2437/BD | 13/12/2021 | 90 | M/S S.S.ENTERPRISE. (SOUTH) | 194.62 | 160.59 | 1 | |||
| 205 | Barasat Division | Formal Work Order for Providing Functional Household Tap Connection (FHTC) from existing and new proposed distribution system within the command area of Gobindapur Water Supply Scheme at Baduria Block, Dist- North 24 Parganas under Barasat Division, PHE Dte.(Phase-I). | ORD/000822/2021-2022 | 2438/BD | 13/12/2021 | 90 | UTPAL CONSTRUCTION & CO. | 224.17 | 222.04 | 1 | |||
| 206 | Barasat Division | Formal Work Order for Providing Functional Household Tap Connection (FHTC) from existing and new proposed distribution system within the command area under Magurali Water Supply Scheme at Baduria Block, District- North 24 Parganas under Barasat Division, PHE Dte.(Phase-I). | ORD/000823/2021-2022 | 2439/BD | 13/12/2021 | 90 | UTPAL CONSTRUCTION & CO. | 232.79 | 205.13 | 1 | |||
| 207 | Barasat Division | Acceptance cum Work Order for Providing Functional Household Tap Connection(FHTC) from existing and new proposed distribution system within the command area of Nityanandakati Balti Water Supply Scheme at Swarupnagar Block under Barasat Division, PHE Dte. (Phase I) | ORD/000830/2021-2022 | 2460/BD | 15/12/2021 | 45 | SHIBU BISWAS. | 66.16 | 65.92 | 1 | |||
| 208 | Barasat Division | Acceptance cum Work Order for Providing Functional Household Tap Connection(FHTC) from existing and new proposed distribution system within the command area of Zafarpur Water Supply Scheme at Basirhat - II Block under Barasat Division, PHE Dte. (Phase - I) | ORD/000831/2021-2022 | 2461/BD | 15/12/2021 | 45 | SHIBU BISWAS. | 81.63 | 81.47 | 1 | |||
| 209 | Barasat Division | Acceptance cum work order for Providing Functional House Hold Tap Connection (FHTC) from existing distribution system at Bergum Water Supply Scheme within the jurisdiction of Habra Sub-Division under Barasat Division, P.H.E. Dte.( For balance work of Retrofitting). | ORD/000837/2022-2023 | 3582/ BD | 08/12/2022 | 30 | ANKUSH CONSTRUCTION & CO. | 16.19 | 15.18 | 1 | |||
| 210 | Barasat Division | Acceptance cum work order for Providing Functional House Hold Tap Connection (FHTC) from existing distribution system at Talsa & Adj. Mouzas Water Supply Scheme within the jurisdiction of Habra Sub-Division under Barasat Division, P.H.E. Dte.( For balance work of Retrofitting). | ORD/000838/2022-2023 | 3583/ BD | 08/12/2022 | 30 | TRISHA ENTERPRISE & CO. | 42.66 | 42.65 | 1 | |||
| 211 | Barasat Division | Acceptance cum work order for Protection work for newly laid different dia. UPVC/DI distribution pipeline at different places in Daudpur Mouza of Daudpur w/s scheme, Sandeshkhali-II block under Hasnabad Sub-Division P.H.E. Dte. | ORD/000850/2023-2024 | 2658/BD | 01/09/2023 | 30 | M/S PROGATI ENTERPRISE. | 34.09 | 33.95 | 100 | |||
| 212 | Barasat Division | Work Order for Hiring of 1(one) number vehicle of Category Motor Cab/Maruti Omni(standard)(Non Air-Conditioned)/LPG/CNG Engine including Driver for performing the inspection works and official duties for the office of the Assistant Engineer, Barrackpore Sub-Division, P.H.E. Dte. at Barrackpore, Kolkata-700122, District- North 24Pgns, W.B.(period from 01.10.2024 to 31.03.2025) | ORD/000851/2024-2025 | 528/BKP | 30/09/2024 | 182 | GOPAL SINGHA. | 0.86 | 2.06 | 0 | |||
| 213 | Barasat Division | Acceptance cum work order for Emergent restoration of concrete road for damage portion at different places due to laying of new DI/UPVC pipe line within Hingalganj w/s scheme (Zone-II), Hingalganj block under Hasnabad Sub-Division P.H.E. Dte. | ORD/000863/2022-2023 | 622/HSD | 07/04/2022 | 15 | M/S NIRMAN CONSTRUCTION. | 2.34 | 2.34 | 1 | |||
| 214 | Barasat Division | Acceptance cum work order for Sinking of 1 nos. 300 mm. x 200 mm. dia. 360 mtr deep Tubewell by D.R. Rig method at with PVC pipe & strainer having 300mm dia 48 mtr. long housing pipe & 200mm dia 30 mtr. long filter at Joygopalpur tail end within Tushkhali w/s scheme, Sandeshkhali-II block under Hasnabad Sub-Division, P.H.E. Dte. | ORD/000863/2024-2025 | 3378/BD | 02/12/2024 | 30 | CHANCHAL ENTERPRISE & CO. | 31.47 | 0.00 | 0 | |||
| 215 | Barasat Division | Formal Work Order for Providing Functional Household Tap Connection (FHTC) in connection with Jal Jeevan Mission (JJM and Jal Swapna) under command area of Bergum Water Supply Scheme at Habra-I Block within the jurisdiction of Habra Sub-Division, under Barasat Division, PHE Dte. (Phase-I). | ORD/000864/2021-2022 | 2484/BD | 17/12/2021 | 1890 | UNICON INDIA. | 163.67 | 123.70 | 100 | |||
| 216 | Barasat Division | Acceptance cum work order for Providing Functional tap connection at Dhulia Jhupkhali FP School, Dhulia Jhupkhali Jr. High School & Jhupkhali FP School within the command area of Jhupkhali w/s scheme, Sandeshkhali-II block under Hasnabad Sub- Division P.H.E. Dte. | ORD/000866/2023-2024 | 1052/HSD | 31/08/2023 | 7 | M/S RAJPATH CONSTRUCTION. | 0.53 | 0.53 | 100 | |||
| 217 | Barasat Division | Acceptance cum work order for Emergent restoration of existing FHTC along with pipe line in connection with retrofitting work at different places within laukhali mouza due to erosion of soil for heavy rain fall during monsoon season within Daudpur w/s scheme, Sandeshkhali-II block under Hasnasbad Sub-Division, P.H.E.Dte. | ORD/000869/2023-2024 | 1055/HSD | 31/08/2023 | 10 | ABDUL ALIM MONDAL. | 0.97 | 0.86 | 100 | |||
| 218 | Barasat Division | Acceptance cum work order for Providing Functional tap connection at Sukhdoani (SPL) FP School, Dk. Sukhdoani FP School & Sukhdoani Dwarikanath FP School within the command area of Sukhdoani w/s scheme, Sandeshkhali-II block under Hasnabad Sub- Division P.H.E. Dte. | ORD/000870/2023-2024 | 1056/HSD | 31/08/2023 | 7 | RAJPATH ENGINEERS-CO-OPERATIVE SOCIETY LTD. | 0.60 | 0.60 | 100 | |||
| 219 | Barasat Division | Acceptance cum work order for Emergent restoration of existing FHTC along with pipe line in connection with retrofitting work at different places within Ghatihara mouza due to erosion of soil for heavy rain fall during monsoon season within Kalinagar w/s scheme (Z-II), Sandeshkhali-I block under Hasnasbad Sub-Division, P.H.E.Dte. | ORD/000871/2023-2024 | 1057/HSD | 31/08/2023 | 10 | M/S RAJPATH CONSTRUCTION. | 0.98 | 0.98 | 100 | |||
| 220 | Barasat Division | Acceptance cum work order for Emergent restoration of existing FHTC along with pipe line in connection with retrofitting work at different places within Putimari mouza due to erosion of soil for heavy rain fall during monsoon season within Kalinagar w/s scheme (Z-II), Sandeshkhali-I block under Hasnasbad Sub-Division, P.H.E.Dte. | ORD/000872/2023-2024 | 1058/HSD | 31/08/2023 | 10 | M/S RAJPATH CONSTRUCTION. | 0.95 | 0.94 | 100 | |||
| 221 | Barasat Division | Acceptance cum work order for Emergent restoration of existing FHTC along with pipe line in connection with retrofitting work at different places within Gazalia mouza due to erosion of soil for heavy rain fall during monsoon season within Kalinagar w/s scheme (Z-II), Sandeshkhali-I block under Hasnasbad Sub-Division, P.H.E.Dte. | ORD/000873/2023-2024 | 1059/HSD | 31/08/2023 | 10 | M/S RAJPATH CONSTRUCTION. | 0.95 | 0.95 | 100 | |||
| 222 | Barasat Division | Acceptance cum work order for Emergent restoration of existing FHTC along with pipe line in connection with retrofitting work at different places within Ghoshpur mouza due to erosion of soil for heavy rain fall during monsoon season within Kalinagar w/s scheme (Z-I), Sandeshkhali-I block under Hasnasbad Sub-Division, P.H.E.Dte. | ORD/000874/2023-2024 | 1060/HSD | 31/08/2023 | 10 | M/S RAJPATH CONSTRUCTION. | 0.93 | 0.93 | 100 | |||
| 223 | Barasat Division | Acceptance cum work order for Emergent restoration of existing FHTC along with pipe line in connection with retrofitting work at different places within Roypur mouza due to erosion of soil for heavy rain fall during monsoon season within Kalinagar w/s scheme (Z-I), Sandeshkhali-I block under Hasnasbad Sub-Division, P.H.E.Dte. | ORD/000875/2023-2024 | 1061/HSD | 31/08/2023 | 10 | M/S RAJPATH CONSTRUCTION. | 0.96 | 0.96 | 100 | |||
| 224 | Barasat Division | Acceptance cum work order for Emergent restoration of existing FHTC along with pipe line in connection with retrofitting work at different places within Kalinagar mouza due to erosion of soil for heavy rain fall during monsoon season within Kalinagar w/s scheme (Z-I), Sandeshkhali-I block under Hasnasbad Sub-Division, P.H.E.Dte. | ORD/000876/2023-2024 | 1063/HSD | 31/08/2023 | 10 | M/S RAJPATH CONSTRUCTION. | 0.97 | 0.97 | 100 | |||
| 225 | Barasat Division | Acceptance cum work order for Protection works in different places for protection of different dia. DI/UPVC rising/distribution pipeline by UC bullah/Bamboo pile in Laukhali and Jhupkhali w/s scheme, Sandeshkhali-I & II block respectively under Hasnabad Sub-Division P.H.E. Dte. | ORD/000879/2023-2024 | 2681/BD | 04/09/2023 | 30 | SURYA ENTERPRISE. | 67.91 | 67.40 | 99 | |||
| 226 | Barasat Division | Acceptance cum work order for Laying of different dia. UPVC pipe line for damage portion due to construction of concrete road at Mamudpur Purba & Paschim para within Hingalganj W/S Scheme (Z-I), Hingalganj block under Hasnasbad Sub-Division, P.H.E.Dte. | ORD/000887/2022-2023 | 936/HSD | 07/06/2022 | 10 | MONDAL & CO. (BASIRHAT). | 3.37 | 0.00 | 1 | |||
| 227 | Barasat Division | Improvement of Iron Elimination Plant and other related allied works at Kurulia (Zone - II) W/S Scheme within the jurisdiction of Bongaon Sub-Division under Barasat Division, P.H.E. Dte. | ORD/000891/2023-2024 | 638/Bon | 14/08/2023 | 15 | SAMBHU RAY CHOWDHURY. | 2.49 | 2.41 | 100 | |||
| 228 | Barasat Division | Formal work order for Improvement of Iron Elimination Plant and other related allied works at Kurulia (Zone-I) W/S Scheme within the jurisdiction of Bongaon Sub-Division under Barasat Division, P.H.E. Dte. | ORD/000896/2023-2024 | 637/Bon | 14/08/2023 | 15 | TAPAN GHOSH. | 2.45 | 0.00 | 99 | |||
| 229 | Barasat Division | Acceptance cum work order for Repairing of existing boundary wall and other allied works at Pump House No.-1 within Kalinagar w/s scheme (Old), Sandeshkhali-I block under Hasnabad Sub-Division P.H.E. Dte. | ORD/000909/2023-2024 | 2720/BD | 05/09/2023 | 21 | ABDUL ALIM MONDAL. | 9.09 | 9.09 | 100 | |||
| 230 | Barasat Division | Formal Work Order for Providing Functional Household Tap Connection(FHTC) from existing and new proposed distribution system within the command area of Itinda Panitar Water Supply Scheme at Basirhat - I Block under Barasat Division, PHE Dte. (Phase - I) | ORD/000912/2021-2022 | 2622/BD | 27/12/2021 | 90 | SUBHASH BOSE. | 171.59 | 164.59 | 1 | |||
| 231 | Barasat Division | Formal Work order for Providing Functional Household Tap Connection (FHTC) in connection with Jal Jeevan Mission (JJM and JAL SWAPNA) under command area of BIRA RAJIBPUR Water Supply Scheme at Habra -II Block within the jurisdiction of Habra Sub-Division, under Barasat Division, P.H.E. Dte. (Phase - I) | ORD/000914/2021-2022 | 2623/BD | 27/12/2021 | 90 | J.D.J.ENTERPRISE. (TRADERS PVT.LTD) | 189.09 | 156.26 | 1 | |||
| 232 | Barasat Division | Formal Work Order for Providing Functional Household Tap Connection (FHTC) in connection with Jal Jeevan Mission (JJM and JAL SWAPNA) under command area of KHOSDELPUR & ITS ADJ. MOUZAS Water Supply Scheme at Habra - II Block within the jurisdiction of Habra Sub-Division, under Barasat Division, P.H.E. Dte. (Phase - I) | ORD/000915/2021-2022 | 2624/BD | 27/12/2021 | 90 | MAHAVIR PUMPS MANUFACTURING PVT.LTD. | 114.14 | 87.23 | 1 | |||
| 233 | Barasat Division | Acceptance cum work order for Protection works for newly laid 200mm dia. UPVC pipe line at N/H/O Susanta Ghosh at Hingalganj within Hingalganj w/s scheme (Zone-I), Hingalganj block under Hasnabad Sub-Division P.H.E. Dte. | ORD/000915/2022-2023 | 935/HSD | 07/07/2022 | 10 | MONDAL & CO. (BASIRHAT). | 2.36 | 2.35 | 1 | |||
| 234 | Barasat Division | Acceptance cum work order for Laying of 90 mm dia. UPVC pipe line from Boltala Kalupara More to near Katakhali Madrasa within Hingalganj W/S Scheme (Z-I), Hingalganj block under Hasnasbad Sub-Division, P.H.E.Dte. | ORD/000917/2022-2023 | 937/HSD | 07/07/2022 | 10 | TRISHA ENTERPRISE & CO. | 3.19 | 0.00 | 1 | |||
| 235 | Barasat Division | Acceptance cum work order for Supply of sluice valve i/c Construction of Sluice valve chamber and other allied works at different location within Bermajur w/s scheme, Sandeshkhali-II block under Hasnabad Sub- Division P.H.E. Dte. | ORD/000920/2021-2022 | 1861/HSD. | 17/11/2021 | 15 | M/S NIRMAN CONSTRUCTION. | 2.37 | 0.00 | 1 | |||
| 236 | Barasat Division | Acceptance cum work order for Supply of sluice valve i/c Construction of Sluice valve chamber and other allied works at different location within Bermajur w/s scheme, Sandeshkhali-II block under Hasnabad Sub- Division P.H.E. Dte. | ORD/000921/2021-2022 | 1861/HSD.. | 17/11/2021 | 15 | M/S NIRMAN CONSTRUCTION. | 2.37 | 2.37 | 0 | |||
| 237 | Barasat Division | Acceptance cum work order for Supply of sluice valve i/c Construction of Sluice valve chamber and other allied works at different location within Kumarjole w/s scheme, Minakhan Block under Hasnabad Sub- Division P.H.E. Dte. | ORD/000926/2021-2022 | 1995/HSD.. | 02/12/2021 | 15 | ABDUL ALIM MONDAL. | 3.50 | 3.50 | 1 | |||
| 238 | Barasat Division | Route Survey, Design Drawing & DPR Preparation for Kamarpur & Adj. Mouzas W/S Scheme within the jurisdiction of the Habra Sub-Division under Barasat Division, PHE Dte. | ORD/000935/2021-2022 | 558/HAB | 20/12/2021 | 10 | UMWELT ENGINEER PVT.LTD. | 3.42 | 3.41 | 1 | |||
| 239 | Barasat Division | Route Survey, Design Drawing & DPR Preparation for Talsa W/S Scheme within the jurisdiction of the Habra Sub-Division under Barasat Division, PHE Dte. | ORD/000938/2021-2022 | 559/HAB | 20/12/2021 | 10 | UMWELT ENGINEER PVT.LTD. | 3.67 | 3.70 | 1 | |||
| 240 | Barasat Division | Route Survey, Design Drawing & DPR Preparation for Kankpul W/S Scheme within the jurisdiction of the Habra Sub-Division under Barasat Division, PHE Dte. | ORD/000939/2021-2022 | 567/HAB | 22/12/2021 | 10 | UMWELT ENGINEER PVT.LTD. | 4.02 | 4.02 | 1 | |||
| 241 | Barasat Division | Formal Work Order cor Providing Functional Household Tap Connection (FHTC) in connection with Jal Jeevan Mission (JJM and JAL SWAPNA) under command area of MASLANDAPUR Water Supply Scheme(ZONE-II) at Habra - I Block within the jurisdiction of Habra Sub-Division, under Barasat Division, P.H.E. Dte. (Phase - I). | ORD/000944/2021-2022 | 01/BD | 03/01/2022 | 90 | M/S B.K.ENTERPRISE. | 145.09 | 139.68 | 1 | |||
| 242 | Barasat Division | Acceptance cum work order for Route Survey, Design Drawing & DPR Preparation for Sahebkhali (Zone-I & Zone-II) Water Supply Scheme under Barasat Division, PHE Dte. | ORD/000952/2021-2022 | 2146/HSD | 28/12/2021 | 21 | SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. | 4.76 | 4.76 | 1 | |||
| 243 | Barasat Division | Acceptance cum work order for additional Survey Work For DPR Preparation of Sahebkhali (Zone-I & Zone-II) Water Supply Scheme under Barasat Division, PHE Dte. | ORD/000953/2021-2022 | 2147/HSD | 28/12/2021 | 21 | SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. | 2.84 | 2.79 | 1 | |||
| 244 | Barasat Division | Acceptance cum work order for Route Survey, Design Drawing & DPR Preparation for Monipur Water Supply Scheme under Barasat Division, PHE Dte. | ORD/000954/2021-2022 | 2150/HSD | 28/12/2021 | 21 | SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. | 4.84 | 4.84 | 1 | |||
| 245 | Barasat Division | Acceptance cum work order for Route Survey, Design Drawing & DPR Preparation for Malancha Zone I Water Supply Scheme under Barasat Division, PHE Dte. | ORD/000955/2021-2022 | 2151/HSD | 28/12/2021 | 21 | SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. | 4.43 | 4.40 | 1 | |||
| 246 | Barasat Division | Acceptance cum work order for Route Survey, Design Drawing & DPR Preparation for Malancha Zone II Water Supply Scheme under Barasat Division, PHE Dte. | ORD/000956/2021-2022 | 2152/HSD | 28/12/2021 | 21 | SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. | 3.77 | 3.75 | 1 | |||
| 247 | Barasat Division | Acceptance cum work order for Route Survey, Design Drawing & DPR Preparation for Murarisha Water Supply Scheme under Barasat Division, PHE Dte. | ORD/000957/2021-2022 | 2153/HSD | 28/12/2021 | 21 | SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. | 4.05 | 4.05 | 1 | |||
| 248 | Barasat Division | Acceptance cum work order for Route Survey, Design Drawing & DPR Preparation for Bhabanipur (Zone-I & Zone-II) Water Supply Scheme under Barasat Division, PHE Dte. | ORD/000960/2021-2022 | 2156/HSD | 28/12/2021 | 21 | SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. | 4.76 | 4.76 | 1 | |||
| 249 | Barasat Division | Acceptance cum work order for Route Survey, Design Drawing & DPR Preparation for Durgapur Baylani Zone I Water Supply Scheme under Barasat Division, PHE Dte. | ORD/000961/2021-2022 | 2158/HSD | 28/12/2021 | 21 | SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. | 4.18 | 4.13 | 1 | |||
| 250 | Barasat Division | Acceptance cum work order for Route Survey, Design Drawing & DPR Preparation for Hasnabad Water Supply Scheme under Barasat Division, PHE Dte. | ORD/000966/2021-2022 | 2163/HSD | 28/12/2021 | 21 | SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. | 4.21 | 4.21 | 1 | |||
| 251 | Barasat Division | Acceptance cum work order for Route Survey, Design Drawing & DPR Preparation for Chaital Water Supply Scheme under Barasat Division, PHE Dte. | ORD/000967/2021-2022 | 2164/HSD | 28/12/2021 | 21 | SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. | 4.49 | 4.48 | 1 | |||
| 252 | Barasat Division | Construction of Approach Road at 2nd T/W site for Augmentation of Krishnachandrapur Water Supply Scheme within the jurisdiction of Bongaon Sub-Division under Barasat Division, P.H.E.Dte. | ORD/000969/2023-2024 | 557/Bon | 18/07/2023 | 15 | ACHINTA KUMAR HALDER. | 0.91 | 0.00 | 0 | |||
| 253 | Barasat Division | Route Survey, Design Drawing & DPR Preparation for Bergum W/S Scheme within the jurisdiction of the Habra Sub-Division under Barasat Division, PHE Dte. | ORD/000970/2021-2022 | 571/HAB | 23/12/2021 | 10 | SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. | 4.71 | 4.71 | 1 | |||
| 254 | Barasat Division | Formal work order for Providing Functional Household Tap Connection (FHTC) in connection with retrofitting of Kanmari w/s scheme (Zone-I), Sandeshkhali-I block under Hasnabad Sub-Division, PHE Dte. | ORD/000971/2022-2023 | 99/BD | 11/01/2023 | 90 | SRI KRISHNA CO-OP-LABOUR CONTRACT AND CONST SOC LTD. | 282.73 | 277.60 | 1 | |||
| 255 | Barasat Division | Construction of Approach Road at 2ndT/W site for Augmentation of Sindrani (Zone-I) Water Supply Scheme within the jurisdiction of Bongaon Sub-Division under Barasat Division, P.H.E.Dte. | ORD/000972/2023-2024 | 562/Bon | 18/07/2023 | 15 | ONKAR ENTERPRISE. | 0.89 | 0.00 | 0 | |||
| 256 | Barasat Division | Acceptance cum work order for Route Survey, Design Drawing & DPR Preparation for Mohanpur (Zone-I & Zone-II) Water Supply Scheme under Barasat Division, PHE Dte. | ORD/000973/2021-2022 | 2140/HSD | 28/12/2021 | 21 | TIYAS CONSULTANCY AND INFRASTRUCTURE PVT.LTD. | 4.77 | 4.77 | 1 | |||
| 257 | Barasat Division | Acceptance cum work order for Additional Survey Work For DPR Preparation of Mohanpur (Zone-I & Zone-II) Water Supply Scheme under Barasat Division, PHE Dte. | ORD/000974/2021-2022 | 2141/HSD | 28/12/2021 | 21 | TIYAS CONSULTANCY AND INFRASTRUCTURE PVT.LTD. | 2.33 | 2.32 | 1 | |||
| 258 | Barasat Division | Formal work order for Providing Functional Household Tap Connection (FHTC) in connection with retofitting of Kanmari w/s scheme (Zone-II), Sandeshkhali-I block under Hasnabad Sub-Division, PHE Dte. | ORD/000974/2022-2023 | 100/BD | 11/01/2023 | 90 | M/S PROGATI ENTERPRISE. | 297.96 | 291.19 | 1 | |||
| 259 | Barasat Division | Acceptance cum work order for Route Survey, Design Drawing & DPR Preparation for Sandeshkhali Water Supply Scheme under Barasat Division, PHE Dte. | ORD/000975/2021-2022 | 2148/HSD | 28/12/2021 | 21 | TIYAS CONSULTANCY AND INFRASTRUCTURE PVT.LTD. | 3.92 | 3.92 | 1 | |||
| 260 | Barasat Division | Acceptance cum work order for Additional Survey Work For DPR Preparation of Sandeshkhali Water Supply Scheme under Barasat Division, PHE Dte. | ORD/000976/2021-2022 | 2149/HSD | 28/12/2021 | 21 | TIYAS CONSULTANCY AND INFRASTRUCTURE PVT.LTD. | 1.17 | 1.17 | 1 | |||
| 261 | Barasat Division | Acceptance cum work order for Emergent restoration of existing FHTC along with pipe line in connection with retrofitting work at different places within Jhupkhali mouza due to erosion of soil for heavy rain fall during monsoon season within Jhupkhali w/s scheme, Sandeshkhali-II block under Hasnasbad Sub-Division, P.H.E.Dte. | ORD/000976/2023-2024 | 1064/HSD | 31/08/2023 | 10 | JESMINE ENTERPRISE. | 0.98 | 0.98 | 100 | |||
| 262 | Barasat Division | Acceptance cum work order for Estimate for Additional Survey Work For DPR Preparation of Bhabanipur (Zone-I & Zone-II) Water Supply Scheme under Barasat Division, PHE Dte. | ORD/000978/2021-2022 | 2157/HSD | 28/12/2021 | 21 | TIYAS CONSULTANCY AND INFRASTRUCTURE PVT.LTD. | 3.47 | 3.44 | 1 | |||
| 263 | Barasat Division | Acceptance cum work order for Route Survey, Design Drawing & DPR Preparation for Chandpur Water Supply Scheme under Barasat Division, PHE Dte. | ORD/000981/2021-2022 | 2166/HSD | 28/12/2021 | 21 | TIYAS CONSULTANCY AND INFRASTRUCTURE PVT.LTD. | 4.50 | 4.46 | 1 | |||
| 264 | Barasat Division | Acceptance cum work order for Route Survey, Design Drawing & DPR Preparation for Chhaimalpur Water Supply Scheme under Barasat Division, PHE Dte. | ORD/000986/2021-2022 | 2169/HSD | 28/12/2021 | 21 | TIYAS CONSULTANCY AND INFRASTRUCTURE PVT.LTD. | 2.79 | 2.79 | 1 | |||
| 265 | Barasat Division | Acceptance cum work order for Route Survey, Design Drawing & DPR Preparation for Ashari Narayanpur Water Supply Scheme under Barasat Division, PHE Dte. | ORD/000987/2021-2022 | 2170/HSD | 28/12/2021 | 21 | SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. | 3.61 | 3.59 | 1 | |||
| 266 | Barasat Division | Acceptance cum work order for Route Survey, Design Drawing & DPR Preparation for Kumarjole Water Supply Scheme under Barasat Division, PHE Dte. | ORD/000988/2021-2022 | 2171/HSD | 28/12/2021 | 21 | UMWELT ENGINEER PVT.LTD. | 4.24 | 4.24 | 1 | |||
| 267 | Barasat Division | Acceptance cum work order for Route Survey, Design Drawing & DPR Preparation for Korakati Water Supply Scheme under Barasat Division, PHE Dte. | ORD/000990/2021-2022 | 2172/HSD | 28/12/2021 | 21 | UMWELT ENGINEER PVT.LTD. | 4.12 | 4.12 | 1 | |||
| 268 | Barasat Division | Acceptance cum work order for Route Survey, Design Drawing & DPR Preparation for Gabbaria Water Supply Scheme under Barasat Division, PHE Dte. | ORD/000993/2021-2022 | 2173/HSD | 28/12/2021 | 21 | UMWELT ENGINEER PVT.LTD. | 3.39 | 3.39 | 1 | |||
| 269 | Barasat Division | Acceptance cum work order for Route Survey, Design Drawing & DPR Preparation for Durgamondop Water Supply Scheme under Barasat Division, PHE Dte. | ORD/000994/2021-2022 | 2175/HSD | 28/12/2021 | 21 | UMWELT ENGINEER PVT.LTD. | 4.15 | 4.15 | 1 | |||
| 270 | Barasat Division | Acceptance cum work order for Emergent restoration of existing FHTC along with pipe line in connection with retrofitting work at different places within Rampur mouza due to erosion of soil for heavy rain fall during monsoon season within Rampur w/s scheme, Sandeshkhali-II block under Hasnasbad Sub-Division, P.H.E.Dte. | ORD/000996/2023-2024 | 1080/HSD | 31/08/2023 | 10 | M/S RAJPATH CONSTRUCTION. | 0.99 | 0.98 | 100 | |||
| 271 | Barasat Division | Acceptance cum work order for Additional Survey Work For DPR Preparation of Khulna Bhandarkhali Zone-I Water Supply Scheme under Barasat Division, PHE Dte. | ORD/000998/2021-2022 | 2178/HSD | 28/12/2021 | 21 | SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. | 2.08 | 2.08 | 1 | |||
| 272 | Barasat Division | Acceptance cum work order for Emergent restoration of existing FHTC along with pipe line in connection with retrofitting work at different places within Kanmari mouza due to erosion of soil for heavy rain fall during monsoon season within Kanmari w/s scheme (Z-I), Sandeshkhali-I block under Hasnasbad Sub-Division, P.H.E.Dte. | ORD/000998/2023-2024 | 1082/HSD | 31/08/2023 | 10 | SARKAR ENTERPRISE | 0.93 | 0.92 | 100 | |||
| 273 | Barasat Division | Acceptance cum work order for Route Survey, Design Drawing & DPR Preparation for Kalitala Water Supply Scheme under Barasat Division, PHE Dte. | ORD/000999/2021-2022 | 2179/HSD | 28/12/2021 | 21 | TIYAS CONSULTANCY AND INFRASTRUCTURE PVT.LTD. | 3.93 | 3.93 | 1 | |||
| 274 | Barasat Division | Acceptance cum work order for Additional Survey Work For DPR Preparation of Kalitala Water Supply Scheme under Barasat Division, PHE Dte. | ORD/001000/2021-2022 | 2180/HSD | 28/12/2021 | 21 | TIYAS CONSULTANCY AND INFRASTRUCTURE PVT.LTD. | 2.52 | 2.52 | 1 | |||
| 275 | Barasat Division | Acceptance cum work order for Emergent restoration of existing FHTC along with pipe line in connection with retrofitting work at different places within Nalkora mouza due to erosion of soil for heavy rain fall during monsoon season within Kanmari w/s scheme (Z-I), Sandeshkhali-I block under Hasnasbad Sub-Division, P.H.E.Dte. | ORD/001000/2023-2024 | 1083/HSD | 31/08/2023 | 10 | SARKAR ENTERPRISE | 0.92 | 0.92 | 100 | |||
| 276 | Barasat Division | Acceptance cum work order for Route Survey, Design Drawing & DPR Preparation for Dakshin Bhebia Zone-II Water Supply Scheme under Barasat Division, PHE Dte. | ORD/001001/2021-2022 | 2181/HSD | 28/12/2021 | 21 | SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. | 3.93 | 3.93 | 1 | |||
| 277 | Barasat Division | Acceptance cum work order for Emergent restoration of existing FHTC along with pipe line in connection with retrofitting work at different places within Nazat mouza due to erosion of soil for heavy rain fall during monsoon season within Kanmari w/s scheme (Z-II), Sandeshkhali-I block under Hasnasbad Sub-Division, P.H.E.Dte. | ORD/001001/2023-2024 | 1084/HSD | 31/08/2023 | 10 | M/S PROGATI ENTERPRISE. | 0.95 | 0.95 | 100 | |||
| 278 | Barasat Division | Acceptance cum work order for Additional Survey Work For DPR Preparation of Dakshin Bhebia Zone-II Water Supply Scheme under Barasat Division, PHE Dte. | ORD/001002/2021-2022 | 2182/HSD | 28/12/2021 | 21 | SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. | 1.99 | 1.99 | 1 | |||
| 279 | Barasat Division | Acceptance cum work order for Emergent restoration of existing FHTC along with pipe line in connection with retrofitting work at different places within Hatgachi mouza due to erosion of soil for heavy rain fall during monsoon season within Kanmari w/s scheme (Z-II), Sandeshkhali-I block under Hasnasbad Sub-Division, P.H.E.Dte. | ORD/001002/2023-2024 | 1085/HSD | 31/08/2023 | 10 | M/S PROGATI ENTERPRISE. | 0.94 | 0.94 | 100 | |||
| 280 | Barasat Division | Acceptance cum work order for Emergent restoration of road for damage portion due to newly laid different dia DI/UPVC distribution pipe line at different places in connection with augmentation of Durgamandop w/s scheme, Sandeshkhali-II block under Hasnabad Sub-Division P.H.E. Dte. | ORD/001018/2023-2024 | 1062/HSD | 31/08/2023 | 10 | ANKUSH CONSTRUCTION & CO. | 0.97 | 0.97 | 100 | |||
| 281 | Barasat Division | Acceptance cum work order for Sinking of Additional 1 nos. 300 mm. x 200 mm. dia. 360 mtr deep Tubewell by D.R. Rig method with PVC pipe & strainer having 300mm dia 48 mtr. long housing pipe & 200mm dia 30 mtr. long filter within Daudpur w/s scheme, Sandeshkhali-II block under Hasnabad Sub-Division, P.H.E. Dte. | ORD/001025/2024-2025 | 3580/BD | 18/12/2024 | 30 | SUBHAJIT SAHA | 31.69 | 0.00 | 0 | |||
| 282 | Barasat Division | Acceptance cum work order for Additional Laying of diff. dia. UPVC pipe line for Providing FHTC in connection with JJM and Jal Swapna at diff. places in Tongtala Mouza within Bouthakurani W/S scheme, Sandeshkhali-II block under Hasnabad Sub-Division within Barasat Division, PHE Dte. (Part-A) | ORD/001026/2021-2022 | 14/HSD | 04/01/2022 | 15 | SRI KRISHNA CO-OP-LABOUR CONTRACT AND CONST SOC LTD. | 4.91 | 0.00 | 1 | |||
| 283 | Barasat Division | Acceptance cum work order for Additional Laying of diff. dia. UPVC pipe line for Providing FHTC in connection with JJM and Jal Swapna at diff. places in Tongtala Mouza within Bouthakurani W/S scheme, Sandeshkhali-II block under Hasnabad Sub-Division within Barasat Division, PHE Dte. (Part-B) | ORD/001028/2021-2022 | 16/HSD | 04/01/2022 | 15 | SRI KRISHNA CO-OP-LABOUR CONTRACT AND CONST SOC LTD. | 4.91 | 4.91 | 1 | |||
| 284 | Barasat Division | Acceptance cum work order for Additional Laying of diff. dia. UPVC pipe line for Providing FHTC in connection with JJM and Jal Swapna at diff. places in Bouthakurani Mouza within Bouthakurani W/S scheme, Sandeshkhali-II block under Hasnabad Sub-Division within Barasat Division, PHE Dte. (Part-A) | ORD/001030/2021-2022 | 18/HSD | 04/01/2022 | 15 | SRI KRISHNA CO-OP-LABOUR CONTRACT AND CONST SOC LTD. | 4.90 | 4.90 | 1 | |||
| 285 | Barasat Division | Acceptance cum work order for Additional Laying of diff. dia. UPVC pipe line for Providing FHTC in connection with JJM and Jal Swapna at diff. places in Bouthakurani Mouza within Bouthakurani W/S scheme, Sandeshkhali-II block under Hasnabad Sub-Division within Barasat Division, PHE Dte. (Part-B) | ORD/001032/2021-2022 | 20/HSD | 04/01/2022 | 15 | SRI KRISHNA CO-OP-LABOUR CONTRACT AND CONST SOC LTD. | 4.91 | 4.91 | 1 | |||
| 286 | Barasat Division | Acceptance cum work order for Additional Laying of diff. dia. UPVC pipe line for Providing FHTC in connection with JJM and Jal Swapna at diff. places in Dholkhali Mouza within Bouthakurani W/S scheme, Sandeshkhali-II block under Hasnabad Sub-Division within Barasat Division, PHE Dte. (Part-A) | ORD/001035/2021-2022 | 22/HSD | 04/01/2022 | 15 | SRI KRISHNA CO-OP-LABOUR CONTRACT AND CONST SOC LTD. | 4.90 | 4.90 | 1 | |||
| 287 | Barasat Division | Acceptance cum work order for Additional Laying of diff. dia. UPVC pipe line for Providing FHTC in connection with JJM and Jal Swapna at diff. places in Dholkhali Mouza within Bouthakurani W/S scheme, Sandeshkhali-II block under Hasnabad Sub-Division within Barasat Division, PHE Dte. (Part-B) | ORD/001037/2021-2022 | 24/HSD | 04/01/2022 | 15 | SRI KRISHNA CO-OP-LABOUR CONTRACT AND CONST SOC LTD. | 4.91 | 4.91 | 1 | |||
| 288 | Barasat Division | Acceptance cum work order for Additional Laying of diff. dia. UPVC pipe line for Providing FHTC in connection with JJM and Jal Swapna at diff. places in Dholkhali Mouza within Bouthakurani W/S scheme, Sandeshkhali-II block under Hasnabad Sub-Division within Barasat Division, PHE Dte. (Part-C) | ORD/001040/2021-2022 | 26/HSD | 04/01/2022 | 15 | SRI KRISHNA CO-OP-LABOUR CONTRACT AND CONST SOC LTD. | 4.79 | 4.76 | 1 | |||
| 289 | Barasat Division | Repairing & renovation of Compressor Room for Iron Elimination Plant under Augmentation of Kurulia (Zone-I) Water Supply Scheme within the jurisdiction of Bongaon Sub-Division under Barasat Division, P.H.E. Dte. | ORD/001049/2023-2024 | 643/Bon | 14/08/2023 | 21 | M/S SAYAN ENTERPRISE. | 1.59 | 1.57 | 100 | |||
| 290 | Barasat Division | Construction of Approach Road at 2ndT/W site for Augmentation of Kurulia (Zone-I) Water Supply Scheme within the jurisdiction of Bongaon Sub-Division under Barasat Division, P.H.E.Dte. | ORD/001065/2023-2024 | 558/Bon | 18/07/2023 | 15 | ROY ENGINEERS. | 0.93 | 0.92 | 100 | |||
| 291 | Barasat Division | Acceptance cum work Order for Providing Functional Household Tap Connection (FHTC) in Baunia Abad mouza including laying of UPVC/PVC pipe & supply of necessary fittings within Baunia Abad w/s scheme, Sandeshkhali-I block under Hasnabad Sub-Division, PHE Dte. (Phase-I) | ORD/001068/2021-2022 | 93/BD | 17/01/2022 | 45 | M/S PROGATI ENTERPRISE. | 77.75 | 77.77 | 1 | |||
| 292 | Barasat Division | Acceptance cum work Order for Providing Functional Household Tap Connection (FHTC) in diff. mouza including laying of UPVC/PVC pipe & supply of necessary fittings within Kalitala W/S scheme, Hingalganj block under Hasnabad Sub-Division, PHE Dte. (Phase-I) | ORD/001070/2021-2022 | 94/BD | 17/01/2022 | 45 | MONDAL & CO. (BASIRHAT). | 80.01 | 79.76 | 1 | |||
| 293 | Barasat Division | Acceptance cum work Order for Providing Functional Household Tap Connection (FHTC) in Rupmari & Bastali mouza including laying of UPVC/PVC pipe & supply of necessary fittings within Rupmari W/S scheme, Hingalganj block under Hasnabad Sub-Division, PHE Dte. | ORD/001074/2021-2022 | 95/BD | 17/01/2022 | 45 | M/S DATTA ENTERPRISE. | 96.84 | 96.43 | 1 | |||
| 294 | Barasat Division | Continuation order for Hiring of one no. DIESEL MOTOR CAB (BS-IV) on daily hire basis for use of the Assistant Engineer, HASNABAD SUB-DIVISION, PHE DTE. Period from 01.10.21 to 30.09.22. | ORD/001081/2021-2022 | 1617/HSD | 29/09/2021 | 365 | SUSMITA MANDAL. | 1.72 | 3.75 | 1 | |||
| 295 | Barasat Division | Formal work order for Providing Functional Household Tap Connection(FHTC) from existing and new proposed distribution system within the command area under BAJITPUR ZONE-I Water Supply Scheme at Baduria Block, District- North 24 Parganas under Barasat Division,PHE Dte. (Phase-I) | ORD/001082/2021-2022 | 141/BD | 18/01/2022 | 90 | ALOK ENTERPRSE. (A UNIT OF SAKET TREXIM PVT.LTD) | 266.04 | 179.15 | 1 | |||
| 296 | Barasat Division | Formal work order for Providing Functional Household Tap Connection (FHTC) in Mamudpur & Hingalganj mouza including laying of UPVC/PVC pipe & supply of necessary fittings within Hingalganj w/s scheme (Zone-I), Hingalganj block under Hasnabad Sub-Division, PHE Dte. | ORD/001087/2021-2022 | 142/BD | 18/01/2022 | 90 | M/S S.S.ENTERPRISE. (SOUTH) | 390.88 | 350.49 | 1 | |||
| 297 | Barasat Division | Acceptance cum work order for Providing Functional Household Tap Connection (FHTC) in connection with Jal Jeevan Mission (JJM and JAL SWAPNA) under command area of KONIARA Water Supply Scheme at Bagdah Block under Barasat Division, PHE Dte. (Phase-I) | ORD/001105/2021-2022 | 164/BD | 19/01/2022 | 30 | ROY CHOWDHURY CONSTRUCTION. | 35.78 | 35.74 | 1 | |||
| 298 | Barasat Division | Acceptance cum work order for Additional Laying of diff. dia. UPVC pipe line for Providing FHTC in connection with JJM and Jal Swapna at diff. places in Tongtala Mouza within Bouthakurani W/S scheme, Sandeshkhali-II block under Hasnabad Sub-Division within Barasat Division, PHE Dte. (Part-A) | ORD/001111/2021-2022 | 14/HSD | 04/01/2022 | 15 | SRI KRISHNA CO-OP-LABOUR CONTRACT AND CONST SOC LTD. | 4.91 | 4.91 | 1 | |||
| 299 | Barasat Division | Acceptance cum work order for Providing Functional Household Tap Connection (FHTC) in Fakirtakia mouza including laying of UPVC/PVC pipe & supply of necessary fittings within Fakirtakia w/s scheme, Sandeshkhali-I Block under Hasnabad Sub-Division, PHE Dte. (Phase-I) | ORD/001113/2021-2022 | 180/BD | 20/01/2022 | 45 | R.K.MANDAL AND CO. | 74.88 | 74.79 | 1 | |||
| 300 | Barasat Division | Route Survey, Design Drawing & DPR Preparation for Bagdah Water Supply Scheme under Bongaon Sub-Division, under Barasat Division,PHE.Dte. | ORD/001114/2021-2022 | 608/Bon | 31/12/2021 | 20 | UMWELT ENGINEER PVT.LTD. | 4.27 | 4.27 | 1 | |||
| 301 | Barasat Division | Route Survey, Design Drawing & DPR Preparation for Sindrani (Zone-II) Water Supply Scheme under Bongaon Sub-Division, under Barasat Division, PHE.Dte. | ORD/001116/2021-2022 | 610/Bon | 31/12/2021 | 20 | UMWELT ENGINEER PVT.LTD. | 3.48 | 3.48 | 1 | |||
| 302 | Barasat Division | Route Survey, Design Drawing & DPR Preparation for Gangrapota Water Supply Scheme under Bongaon Sub-Division, under Barasat Division, PHE.Dte. | ORD/001117/2021-2022 | 611/Bon | 31/12/2021 | 20 | SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. | 4.12 | 4.10 | 1 | |||
| 303 | Barasat Division | Route Survey, Design Drawing & DPR Preparation for Krishnachandrapur Water Supply Scheme under Bongaon Sub-Division, under Barasat Division, PHE.Dte. | ORD/001118/2021-2022 | 612/Bon | 31/12/2021 | 20 | SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. | 4.09 | 4.07 | 1 | |||
| 304 | Barasat Division | Route Survey, Design Drawing & DPR Preparation for Panchita Water Supply Scheme under Bongaon Sub-Division, under Barasat Division,PHE.Dte. | ORD/001119/2021-2022 | 613/Bon | 31/12/2021 | 20 | SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. | 3.80 | 3.80 | 1 | |||
| 305 | Barasat Division | Acceptance cum work order for Providing Functional Household Tap Connection (FHTC) in connection with Jal Jeevan Mission (JJM and JAL SWAPNA) under command area of TALSA Water Supply Scheme at Habra - II Block under Barasat Division, PHE Dte. (Phase - I) | ORD/001120/2021-2022 | 181/BD | 20/01/2022 | 45 | CHANDA CONSTRUCTION. | 71.19 | 69.88 | 1 | |||
| 306 | Barasat Division | Acceptance cum work order for Providing Functional Household Tap Connection (FHTC) in connection with Jal Jeevan Mission (JJM and JAL SWAPNA) under command area of Gopalpur Chandigarh Mouza (Part-I), and Dariala, Birpur, Banspol mouzas within Humaipur Water Supply Scheme at Barasat II Block under Barasat Division, PHE Dte. Part-A(Phase-II). | ORD/001121/2021-2022 | 182/BD | 20/01/2022 | 45 | MONDAL ENTERPRISE. (BARASAT) | 88.28 | 86.90 | 1 | |||
| 307 | Barasat Division | Hiring 1(One) No. Diesel Luxury Car on Daily basis. (for six months from w.e.f. 01.12.2022) for the office use of the Assistant Engineer, Barasat Sub Division, P.H.E. Dte. | ORD/001123/2022-2023 | 804/BSD | 30/11/2022 | 182 | MADHAB CHANDRA DAS | 0.86 | 0.26 | 1 | |||
| 308 | Barasat Division | Acceptance cum work order for for protection works for newly laid different dia. UPVC/DI pipe line at different. places in Mamudpur mouza for Hingalganj w/s scheme (Zone-I), Hingalganj block under Hasnabad Sub-Division P.H.E. Dte. | ORD/001137/2021-2022 | 232/BD | 25/01/2022 | 30 | MONDAL & CO. (BASIRHAT). | 31.20 | 31.43 | 1 | |||
| 309 | Barasat Division | Continuation work order for Hiring 1(one) no. Diesel Luxary Car on daily basis (for 01.01.2023 to 30.04.2023) for office use of the Assistant Engineer, R.W.S Barasat Sub-Division, P.H.E. Dte. | ORD/001138/2022-2023 | 883/BST | 28/12/2022 | 120 | DEBAPRASAD MONDAL. | 0.57 | 0.95 | 1 | |||
| 310 | Barasat Division | Formal work order for for Providing Functional Household Tap Connection(FHTC) from existing and new proposed distribution system within the command area of Banglani Water Supply Scheme at Swarupnagar Block under Barasat Division, PHE Dte. (Phase - I) | ORD/001139/2021-2022 | 217/BD | 24/01/2022 | 90 | JAL PRAVAHIKA PVT. LTD. | 221.85 | 168.02 | 1 | |||
| 311 | Barasat Division | Acceptance cum work order for Providing Functional Household Tap Connection(FHTC) from existing and new proposed distribution system within the command area of Pifa Water Supply Scheme at Basirhat - I Block under Barasat Division, PHE Dte. (Phase - I) | ORD/001140/2021-2022 | 221/BD | 24/01/2022 | 45 | M/S ANUBHAB CONSTRUCTION. | 68.51 | 67.86 | 1 | |||
| 312 | Barasat Division | Acceptance cum work order for Providing Functional Household Tap Connection(FHTC) from existing and new proposed distribution system within the command area of Debog Water Supply Scheme at Basirhat - I Block under Barasat Division, PHE Dte. (Phase - I) | ORD/001143/2021-2022 | 222/BD | 24/01/2022 | 45 | J.D.J.ENTERPRISE. (TRADERS PVT.LTD) | 91.48 | 35.12 | 1 | |||
| 313 | Barasat Division | Acceptance cum work order for Construction of boundary wall with RCC column structure at Pump House No.-2 within Rampur w/s scheme, Sandeshkhali-II block under Hasnabad Sub- Division P.H.E. Dte. (Part-A) | ORD/001144/2022-2023 | 771/HSD | 13/05/2022 | 21 | BASIRHAT ANCHALICK SHARAMICK THIKADARY SAMABAY SAMITY LTD. | 4.77 | 4.17 | 1 | |||
| 314 | Barasat Division | Acceptance cum work order for Construction of boundary wall with RCC column structure at Pump House No.-2 within Rampur w/s scheme, Sandeshkhali-II block under Hasnabad Sub- Division P.H.E. Dte. (Part-B) | ORD/001145/2022-2023 | 772/HSD | 13/05/2022 | 21 | BASIRHAT ANCHALICK SHARAMICK THIKADARY SAMABAY SAMITY LTD. | 1.75 | 1.70 | 1 | |||
| 315 | Barasat Division | Acceptance cum work order for for protection works for newly laid different dia. UPVC/DI pipe line at different. places in Hingalganj mouza for Hingalganj w/s scheme (Zone-I), Hingalganj block under Hasnabad Sub-Division P.H.E. Dte. | ORD/001147/2021-2022 | 235/BD | 25/01/2022 | 15 | MONDAL & CO. (BASIRHAT). | 18.36 | 18.36 | 1 | |||
| 316 | Barasat Division | Acceptance cum work order for for protection works for newly laid different dia. UPVC/DI pipe line at different. places in khosbas, Singherkati mouza & Kanaknagar Mouza for Hingalganj w/s scheme (Zone-II), Hingalganj block under Hasnabad Sub-Division P.H.E. Dte. | ORD/001149/2021-2022 | 237/BD | 25/01/2022 | 30 | M/S PROGATI ENTERPRISE. | 31.04 | 31.03 | 1 | |||
| 317 | Barasat Division | Acceptance cum work order for Providing Functional Household Tap Connection(FHTC) from existing and new proposed distribution system within the command area of Sankchura Water Supply Scheme at Basirhat - I Block under Barasat Division, PHE Dte. (Phase - I) | ORD/001156/2021-2022 | 245/BD | 27/01/2022 | 45 | SHIBU BISWAS. | 78.21 | 77.09 | 1 | |||
| 318 | Barasat Division | Formal work order for Providing Functional Household Tap Connection (FHTC) in connection with Jal Jeevan Mission (JJM and JAL SWAPNA) under command area of CHIKANPARA Water Supply Scheme at GAIGHATA Block under Barasat Division, PHE Dte. (Phase-I) | ORD/001157/2021-2022 | 259/BD | 28/01/2022 | 90 | SUPER SKILL. | 195.19 | 194.56 | 1 | |||
| 319 | Barasat Division | Formal work order for Laying of Distribution system, Construction of Office cum Guard room, Switch cum Chlorine Room, Boundary wall, Surface drain, Land development and other allied works and Providing FHTC within the jurisdiction of (Zone-XII) under Habra-Gaighata surface based PWSS of Habra-I Block under Barasat Division, P.H.E. Dte. | ORD/001159/2023-2024 | 2957/BD | 29/09/2023 | 810 | AMAL DUTTA ROY | 1,929.73 | 190.93 | 22 | |||
| 320 | Barasat Division | Hiring of 1 no. of Diesel Luxury Car (Euro - IV/VI) in good condition (traffic worthy) on daily basis for office use of the Assistant Engineer,Habra Sub-Division, P.H.E. Dte. (For the period from: 01.12.2021 to 30.11.2022) | ORD/001160/2021-2022 | 488/HAB | 30/11/2021 | 1 | M/S LATIKA CONSTRUCTION. | 1.73 | 3.52 | 1 | |||
| 321 | Barasat Division | Formal work order for Laying of Distribution system, Construction of Office cum Guard room, Switch cum Chlorine Room, Boundary wall, Surface drain, Land development and other allied works and Providing FHTC within the jurisdiction of (Zone-XIII) under Habra-Gaighata surface based PWSS of Habra-I Block under Barasat Division, P.H.E. Dte. | ORD/001160/2023-2024 | 2958/BD | 29/09/2023 | 720 | M/S S.S.ENTERPRISE. (SOUTH) | 2,094.04 | 436.76 | 65 | |||
| 322 | Barasat Division | Formal Work order for Providing Functional Household Tap Connection (FHTC) in connection with Jal Jeevan Mission (JJM and JAL SWAPNA) under command area of ICHHAPUR Water Supply Scheme at Gaighata Block under Barasat Division, PHE Dte. (Phase-I) | ORD/001161/2021-2022 | 313/BD | 01/02/2022 | 90 | MONDAL & CO. (BASIRHAT). | 123.07 | 121.07 | 1 | |||
| 323 | Barasat Division | Formal work order for Laying of Distribution system, Construction of Office cum Guard room, Switch cum Chlorine Room, Boundary wall, Surface drain, Land development and other allied works and Providing FHTC within the jurisdiction of (Zone-XIX) under Habra-Gaighata surface based PWSS of Gaighata Block under Barasat Division, P.H.E. Dte. | ORD/001161/2023-2024 | 2954/BD | 29/09/2023 | 721 | SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. | 1,879.95 | 958.81 | 95 | |||
| 324 | Barasat Division | Formal work order for Providing Functional Household Tap Connection (FHTC) in connection with Jal Jeevan Mission (JJM and JAL SWAPNA) under command area of Ghatpatila (Zone-I) Water Supply Scheme at Bagdah Block under Barasat Division, PHE Dte. (Phase-I) | ORD/001162/2021-2022 | 314/BD | 01/02/2022 | 90 | M/S NIRMAN CONSTRUCTION. | 113.02 | 112.46 | 1 | |||
| 325 | Barasat Division | Formal work order for Laying of Distribution system, Construction of Office cum Guard room, Switch cum Chlorine Room, Boundary wall, Surface drain, Land development and other allied works and Providing FHTC within the jurisdiction of (Zone-XXI) under Habra-Gaighata surface based PWSS of Gaighata Block under Barasat Division, P.H.E. Dte. | ORD/001162/2023-2024 | 2953/BD | 29/09/2023 | 721 | SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. | 1,791.33 | 553.22 | 85 | |||
| 326 | Barasat Division | Formal work order for Laying of Distribution system, Construction of Office cum Guard room, Switch cum Chlorine Room, Boundary wall, Surface drain, Land development and other allied works and Providing FHTC within the jurisdiction of (Zone-XXIII) under Habra-Gaighata surface based PWSS of Gaighata Block under Barasat Division, P.H.E. Dte. | ORD/001163/2023-2024 | 2956/BD | 29/09/2023 | 810 | J.D.J.ENTERPRISE. (TRADERS PVT.LTD) | 2,089.66 | 260.09 | 20 | |||
| 327 | Barasat Division | Formal work order for Laying of Distribution system, Construction of Office cum Guard room, Switch cum Chlorine Room, Boundary wall, Surface drain, Land development and other allied works and Providing FHTC within the jurisdiction of (Zone-XXVI) under Habra-Gaighata surface based PWSS of Gaighata Block under Barasat Division, P.H.E. Dte. | ORD/001165/2023-2024 | 2955/BD | 29/09/2023 | 810 | ALOK ENTERPRSE. (A UNIT OF SAKET TREXIM PVT.LTD) | 1,603.84 | 652.61 | 75 | |||
| 328 | Barasat Division | Formal work order for Providing Functional Household Tap Connection(FHTC) from existing and new proposed distribution system within the command area of Gokna Water Supply Scheme at Baduria Block under Barasat Division, PHE Dte. (Phase - I) | ORD/001166/2021-2022 | 315/BD | 01/02/2022 | 90 | KINGS & CO. | 220.60 | 214.18 | 1 | |||
| 329 | Barasat Division | Continuation work order for the work of Hiring Diesel Luxury Car on daily basis (for 6months from 01-01-2022 to 30-06-2022) for the Office of the Assistant Engineer (HQ), Barasat Division, PHE Dte. | ORD/001167/2021-2022 | 2686/BD | 31/12/2021 | 181 | M/S SAMIT CHANDRA DEY. | 0.86 | 0.80 | 1 | |||
| 330 | Barasat Division | Formal work order for Laying of Distribution system, Construction of Office cum Guard room, Switch cum Chlorine Room, Boundary wall, Surface drain, Land development and other allied works and Providing FHTC within the jurisdiction of (Zone-XXIV) under Habra-Gaighata surface based PWSS of Gaighata Block under Barasat Division, P.H.E. Dte. | ORD/001172/2023-2024 | 2959/BD | 29/09/2023 | 720 | M/S S.S.ENTERPRISE. (SOUTH) | 1,776.28 | 314.49 | 33 | |||
| 331 | Barasat Division | Acceptance cum work order for Supply of sluice valve i/c Construction of Sluice valve chamber and other allied works at different location within Kalitala w/s scheme, Hingalganj block under Hasnabad Sub- Division P.H.E. Dte. | ORD/001178/2021-2022 | 251/HSD | 07/02/2022 | 10 | MONDAL & CO. (BASIRHAT). | 4.62 | 4.62 | 1 | |||
| 332 | Barasat Division | Formal work order for Laying Distribution system, Construction of Office cum Guard room, Switch cum Chlorine Room, Boundary wall, Surface drain, Land development and other allied works and Providing FHTC at Zonal Head Work Site Zone-VI within the jurisdiction of (Zone-VI) under Habra-Gaighata surface based PWSS of Deganga Block under Barasat Division, P.H.E. Dte. | ORD/001178/2023-2024 | 3008/BD | 05/10/2023 | 90 | PATHIK PABAN NANDI | 697.92 | 0.00 | 0 | |||
| 333 | Barasat Division | Acceptance cum work order for Emergent restoration of concrete road for damage portion at different places due to laying of new UPVC pipe line within Kalitala w/s scheme, Hingalganj block under Hasnabad Sub-Division P.H.E. Dte. | ORD/001179/2021-2022 | 252/HSD | 07/02/2022 | 7 | MONDAL & CO. (BASIRHAT). | 2.06 | 0.87 | 1 | |||
| 334 | Barasat Division | Formal work order for Laying Distribution system, Construction of Office cum Guard room, Switch cum Chlorine Room, Boundary wall, Surface drain, Land development and other allied works and Providing FHTC at Zonal Head work site - XVII i.e. Betpuli within the jurisdiction of (Zone-XVII) under Habra-Gaighata surface based PWSS of Habra-I Block PART-F under Barasat Division, P.H.E. Dte. | ORD/001179/2023-2024 | 3020/BD | 05/10/2023 | 810 | BALAJI UDDYOG | 991.27 | 260.33 | 65 | |||
| 335 | Barasat Division | Acceptance cum work order for Supply of sluice valve i/c Construction of Sluice valve chamber and other allied works at different location within Rupmari w/s scheme (For Zone-IV to VI), Hingalganj block under Hasnabad Sub- Division P.H.E. Dte. | ORD/001180/2021-2022 | 253/HSD | 07/02/2022 | 10 | M/S DATTA ENTERPRISE. | 3.46 | 0.00 | 1 | |||
| 336 | Barasat Division | Acceptance cum Work Order for Hiring of 1(one) number vehicle of Category Motor Cab/Maruti Omni(standard)(Non Air-Conditioned)/LPG/CNG Engine including Driver for performing the inspection works and official duties for the office of the Assistant Engineer, Barrackpore Sub-Division, P.H.E. Dte. at Barrackpore, Kolkata-700122, District- North 24Pgns, W.B. | ORD/001180/2023-2024 | 253/BKP | 31/07/2023 | 184 | GOPAL SINGHA. | 0.87 | 2.09 | 40 | |||
| 337 | Barasat Division | Acceptance cum work order for Additional Laying of 75 mm dia. UPVC pipe line for Providing FHTC in connection with JJM and Jal Swapna at diff. places in Parghumti Mouza within Kalitala W/S scheme, Hingalganj block under Hasnabad Sub-Division within Barasat Division, PHE Dte. | ORD/001181/2021-2022 | 254/HSD | 07/02/2022 | 10 | MONDAL & CO. (BASIRHAT). | 4.54 | 4.54 | 1 | |||
| 338 | Barasat Division | Acceptance cum work order for Additional Laying of 50 mm dia. UPVC pipe line for Providing FHTC in connection with JJM and Jal Swapna at diff. places in Parghumti Mouza within Kalitala W/S scheme, Hingalganj block under Hasnabad Sub-Division within Barasat Division, PHE Dte. | ORD/001182/2021-2022 | 255/HSD | 07/02/2022 | 10 | MONDAL & CO. (BASIRHAT). | 4.54 | 4.54 | 1 | |||
| 339 | Barasat Division | Acceptance cum work order for Supply of sluice valve i/c Construction of Sluice valve chamber and other allied works at different location within Rupmari w/s scheme (For Zone-I to III), Hingalganj block under Hasnabad Sub- Division P.H.E. Dte. | ORD/001183/2021-2022 | 256/HSD | 07/02/2022 | 10 | M/S PROGATI ENTERPRISE. | 3.46 | 0.00 | 1 | |||
| 340 | Barasat Division | Formal work order for Laying of Distribution System, Providing FHTC, Construction of Office cum Guard room, Land development and Switch cum Chlorine Room, Boundary wall, Surface drain and other allied works within the jurisdiction of (Zone-XX) i.e. Matikumra / (Zone-XXII) i.e. Chikanpara under Habra-Gaighata surface based PWSS, of Gaighata Block under Barasat Division, P.H.E. Dte. GAIGHATA BLOCK, PART-B / Gaighata Block, PART-D | ORD/001214/2023-2024 | 4073/BD | 16/10/2023 | 730 | SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. | 2,790.09 | 1,430.41 | 88 | |||
| 341 | Barasat Division | Formal work order for Construction of 1 no. 1250 Cum capacity OHR, Land development, Construction of Office cum Guard room and Switch cum Chlorine Room, Boundary wall, Surface drain and related allied works at Zone-IX Head work site including Laying Distribution System and FHTC of Habra-Gaighata surface water based water supply scheme under Barasat Division, P.H.E. Dte. | ORD/001216/2023-2024 | 4138/BD | 18/10/2023 | 1095 | S & P ENTERPRISE | 1,608.93 | 0.00 | 20 | |||
| 342 | Barasat Division | Formal work order for Construction of 1150 cum capacity 20 mtr. staging height R.C.C. Over Head Water Reservoir as per Departmental design, drawing and specification including bored pile & pile cap at (Zone- XXV) i.e. Jhikra & Laying of Distribution System, Providing FHTC, Construction Land development, Construction of Office cum Guard room and Switch cum Chlorine Room, Boundary wall, Surface drain and other allied works within the jurisdiction of (Zone-XXV) under Surface Water based Water Supply Scheme for Arsenic Affected Areas of Habra-Gaighata & Adjoining Mouzas under North 24 Parganas District project¿ under Barasat Division, P.H.E. Dte. Gaighata Block, PART-G. | ORD/001215/2023-2024 | 4081/BD | 16/10/2023 | 747 | GBC INFRASTRUCTURE PRIVATE LIMITED | 1,699.27 | 341.53 | 45 | |||
| 343 | Barasat Division | Day to Day repair Operation & maintenance of CI/DI/HDPE/UPVC/AC/GI Rising main & Distribution system for Bansghata water supply scheme under Bongaon Sub-Division, P.H.E.Dte. | ORD/001229/2021-2022 | 622/Bon | 31/12/2021 | 1 | KAMAL HALDAR. | 1.39 | 0.00 | 1 | |||
| 344 | Barasat Division | Acceptance cum Work Order for Hiring of 1(one) number vehicle of Category Motor Cab/Maruti Omni(standard)(Non Air-Conditioned)/LPG/CNG Engine including Driver for performing the inspection works and official duties for the office of the Assistant Engineer, Barrackpore Sub-Division, P.H.E. Dte. at Barrackpore, Kolkata-700122, District- North 24Pgns, W.B.(From 01.10.2023 to 31.03.2024) | ORD/001235/2023-2024 | 333/BKP | 29/09/2023 | 182 | GOPAL SINGHA. | 0.87 | 1.57 | 80 | |||
| 345 | Barasat Division | Acceptance cum work order for for Providing Functional Household Tap Connection(FHTC) from existing and new proposed distribution system within the command area of Bansjhari Mallikpur Supply Scheme at Basirhat - I Block under Barasat Division, PHE Dte. (Phase -I). | ORD/001242/2021-2022 | 400/BD | 10/02/2022 | 30 | SUDHAMAY MAJUMDAR. | 50.02 | 48.28 | 1 | |||
| 346 | Barasat Division | Acceptance cum work order for Providing Functional Household Tap Connection(FHTC) from existing and new proposed distribution system within the command area of Masia Nabastia water Supply Scheme at Baduria Block under Barasat Division, PHE Dte. (Phase - I) | ORD/001243/2021-2022 | 401/BD | 10/02/2022 | 45 | PREMANANDA ROY BISWAS. | 49.45 | 49.25 | 1 | |||
| 347 | Barasat Division | Acceptance cum work order for Providing Functional Household Tap Connection(FHTC) from existing and new proposed distribution system within the command area of Akipur Water Supply Scheme at Basirhat - II Block under Barasat Division, PHE Dte. (Phase - I) | ORD/001248/2021-2022 | 402/BD | 10/02/2022 | 30 | SARKAR ENTERPRISE & CO. | 51.46 | 46.89 | 1 | |||
| 348 | Barasat Division | Formal work order for construction of 250 cum capacity 20 mtr. staging height R.C.C. Over Head Water Reservoir as per Departmental design, drawing and specification including bored pile & pile cap for Kanmari water supply scheme (Zone-I), Sandeshkhali-I Block of Hasnabad Sub-Division, under Barasat Division, P.H.E. Dte. | ORD/001248/2023-2024 | 4180/BD | 30/10/2023 | 365 | TRISHA ENTERPRISE & CO. | 113.90 | 72.36 | 70 | |||
| 349 | Barasat Division | Acceptance cum work order for Providing Functional Household Tap Connection(FHTC) from existing and new proposed distribution system within the command area of Eojnagar Water Supply Scheme at Basirhat - II Block under Barasat Division, PHE Dte. (Phase - I) | ORD/001249/2021-2022 | 403/BD | 10/02/2022 | 45 | UTPAL CONSTRUCTION & CO. | 91.51 | 0.00 | 1 | |||
| 350 | Barasat Division | Acceptance cum work order for Providing Functional Household Tap Connection(FHTC) from existing and new proposed distribution system within the command area of Dhanyakuria water Supply Scheme at Basirhat - II Block under Barasat Division, PHE Dte. (Phase - I) | ORD/001256/2021-2022 | 404/BD | 10/02/2022 | 45 | UTPAL CONSTRUCTION & CO. | 82.70 | 73.58 | 1 | |||
| 351 | Barasat Division | Acceptance cum work order for Construction and installation of MANIFOLD and allied works at OHR site at PH No.-1 within Tushkhali w/s scheme, Sandeshkhali-II block under Hasnabad Sub-Division P.H.E. Dte. | ORD/001272/2024-2025 | 259/BD | 22/01/2025 | 45 | B.S.ENTERPRISE. (BASIRHAT) | 34.32 | 0.00 | 0 | |||
| 352 | Barasat Division | Acceptance cum work order for Construction of boundary wall with RCC column structure at Head Work site (PH No-1) within Chunchura & Rajbari w/s scheme, Sandeshkhali-I block under Hasnabad Sub- Division P.H.E. Dte. | ORD/001303/2023-2024 | 4376/BD | 10/11/2023 | 90 | MONDAL & CO. (BASIRHAT). | 23.88 | 0.00 | 0 | |||
| 353 | Barasat Division | Acceptance cum work order for Construction of boundary wall with RCC column structure at Head Work site (TW No-1) within Jhupkhali w/s scheme, Sandeshkhali-II block under Hasnabad Sub- Division P.H.E. Dte. | ORD/001304/2023-2024 | 4377/BD | 10/11/2023 | 90 | JESMINE ENTERPRISE. | 21.09 | 20.58 | 100 | |||
| 354 | Barasat Division | Acceptance cum work order for Construction of boundary wall with RCC column structure at head Work site within Daudpur w/s scheme, Sandeshkhali-II block under Hasnabad Sub- Division P.H.E. Dte. | ORD/001305/2023-2024 | 4378/BD | 10/11/2023 | 90 | RAJPATH ENGINEERS-CO-OPERATIVE SOCIETY LTD. | 23.09 | 21.09 | 100 | |||
| 355 | Barasat Division | Continuation work order for Hiring Diesel Luxury Car on Daily basis (for 6 months from 01.04.2023 to 30.06.2023) for the office use of the Executive Engineer, Barasat Division, PHE Dte | ORD/001306/2022-2023 | 1044/BD | 31/03/2023 | 91 | MADHAB CHANDRA DAS | 0.45 | 0.69 | 100 | |||
| 356 | Barasat Division | Acceptance cum Work order for Construction of boundary wall with RCC column structure at Head Work site within Tushkhali w/s scheme, Sandeshkhali-II block under Hasnabad Sub- Division P.H.E. Dte. | ORD/001307/2023-2024 | 4379/BD | 10/11/2023 | 90 | R. B. ENTERPRISE | 21.29 | 18.48 | 100 | |||
| 357 | Barasat Division | Acceptance cum work order for Construction of boundary wall with RCC column structure at Head Work site (Ph No-1) within Sukhdoani w/s scheme, Sandeshkhali-II block under Hasnabad Sub- Division P.H.E. Dte. | ORD/001309/2023-2024 | 4381/BD | 10/11/2023 | 90 | ABDUL ALIM MONDAL. | 24.32 | 24.25 | 100 | |||
| 358 | Barasat Division | Acceptance cum work order for Construction of boundary wall with brick masonry structure at Head Work site within Jeliakhali Purbakhanda w/s scheme, Sandeshkhali-II block under Hasnabad Sub- Division P.H.E. Dte. | ORD/001311/2023-2024 | 4382/BD | 10/11/2023 | 90 | MD.SALIM GAZI. | 28.33 | 26.22 | 68 | |||
| 359 | Barasat Division | Route Survey, Design Drawing & Preparation of DPR for Chhaygharia (Zone-I) Water Supply Scheme in Bongaon Block within the Jurisdiction of Bongaon Sub-Division under Barasat Division, PHE Dte. | ORD/001317/2021-2022 | 123/Bon | 18/02/2022 | 15 | SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. | 3.45 | 0.00 | 1 | |||
| 360 | Barasat Division | Route Survey, Design Drawing & Preparation of DPR for Chhaygharia (Zone-II) Water Supply Scheme in Bongaon Block within the Jurisdiction of Bongaon Sub-Division under Barasat Division, PHE Dte. | ORD/001318/2021-2022 | 124/Bon | 18/02/2022 | 15 | SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. | 2.98 | 0.00 | 1 | |||
| 361 | Barasat Division | Route Survey, Design Drawing & Preparation of DPR for Chhaygharia (Zone-III) Water Supply Scheme in Bongaon Block within the Jurisdiction of Bongaon Sub-Division under Barasat Division, PHE Dte. | ORD/001320/2021-2022 | 125/Bon | 18/02/2022 | 15 | SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. | 3.42 | 0.00 | 1 | |||
| 362 | Barasat Division | Route Survey, Design Drawing & Preparation of DPR for Chowberia Water Supply Scheme in Bongaon Block within the Jurisdiction of Bongaon Sub-Division under Barasat Division, PHE Dte. | ORD/001322/2021-2022 | 127/Bon | 18/02/2022 | 15 | SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. | 3.45 | 0.00 | 1 | |||
| 363 | Barasat Division | Route Survey, Design Drawing & Preparation of DPR for Gadpukuria (Zone-I) Water Supply Scheme in Bagdah Block within the Jurisdiction of Bongaon Sub-Division under Barasat Division, PHE Dte. | ORD/001326/2021-2022 | 128/Bon | 18/02/2022 | 15 | SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. | 4.55 | 4.55 | 1 | |||
| 364 | Barasat Division | Route Survey, Design Drawing & Preparation of DPR for Gadpukuria (Zone-II) Water Supply Scheme in Bagdah Block within the Jurisdiction of Bongaon Sub-Division under Barasat Division, PHE Dte. | ORD/001328/2021-2022 | 129/Bon | 18/02/2022 | 15 | SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. | 3.73 | 0.00 | 1 | |||
| 365 | Barasat Division | Route Survey, Design Drawing & Preparation of DPR for Ghatpatila (Zone-I) Water Supply Scheme in Bagdah Block within the Jurisdiction of Bongaon Sub-Division under Barasat Division, PHE Dte. | ORD/001329/2021-2022 | 130/Bon | 18/02/2022 | 15 | SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. | 4.11 | 4.11 | 1 | |||
| 366 | Barasat Division | Route Survey, Design Drawing & Preparation of DPR for Ghatpatila (Zone-II) Water Supply Scheme in Bagdah Block within the Jurisdiction of Bongaon Sub-Division under Barasat Division, PHE Dte. | ORD/001330/2021-2022 | 131/Bon | 18/02/2022 | 15 | SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. | 3.89 | 0.00 | 1 | |||
| 367 | Barasat Division | Route Survey, Design Drawing & Preparation of DPR for Gobindapur Water Supply Scheme in Bagdah Block within the Jurisdiction of Bongaon Sub-Division under Barasat Division, PHE Dte. | ORD/001332/2021-2022 | 132/Bon | 18/02/2022 | 15 | SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. | 4.21 | 4.19 | 1 | |||
| 368 | Barasat Division | Route Survey, Design Drawing & Preparation of DPR for Hariharpur Water Supply Scheme in Bagdah Block within the Jurisdiction of Bongaon Sub-Division under Barasat Division, PHE Dte. | ORD/001333/2021-2022 | 133/Bon | 18/02/2022 | 15 | SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. | 3.14 | 3.14 | 1 | |||
| 369 | Barasat Division | Acceptance cum work order for Construction of boundary wall with brick masonry structure at Head Work site (PH No-1) within Kalinagar w/s scheme (Z-II), Sandeshkhali-I block under Hasnabad Sub- Division P.H.E. Dte. | ORD/001333/2023-2024 | 4436/BD | 10/11/2023 | 90 | M/S SANJAY ADHIKARI | 16.63 | 16.49 | 81 | |||
| 370 | Barasat Division | Route Survey, Design Drawing & Preparation of DPR for Helencha Water Supply Scheme in Bagdah Block within the Jurisdiction of Bongaon Sub-Division under Barasat Division, PHE Dte. | ORD/001334/2021-2022 | 134/Bon | 18/02/2022 | 15 | SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. | 4.84 | 4.84 | 1 | |||
| 371 | Barasat Division | Acceptance cum work order for Construction of boundary wall with RCC column structure at PH No-1 & 2 within Kanmari w/s scheme (Z-I), Sandeshkhali-I block under Hasnabad Sub- Division P.H.E. Dte. | ORD/001334/2023-2024 | 4406/BD | 10/11/2023 | 90 | NIKHIL SAMADDAR | 26.72 | 10.03 | 70 | |||
| 372 | Barasat Division | Route Survey, Design Drawing & Preparation of DPR for Kamlabas Water Supply Scheme in Bagdah Block within the Jurisdiction of Bongaon Sub-Division under Barasat Division, PHE Dte. | ORD/001336/2021-2022 | 135/Bon | 18/02/2022 | 15 | SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. | 3.26 | 3.26 | 1 | |||
| 373 | Barasat Division | Route Survey, Design Drawing & Preparation of DPR for Kola Water Supply Scheme in Bagdah Block within the Jurisdiction of Bongaon Sub-Division under Barasat Division, PHE Dte. | ORD/001337/2021-2022 | 136/Bon | 18/02/2022 | 15 | SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. | 3.64 | 0.00 | 1 | |||
| 374 | Barasat Division | Route Survey, Design Drawing & Preparation of DPR for Kurulia (Zone-I) Water Supply Scheme in Bagdah Block within the Jurisdiction of Bongaon Sub-Division under Barasat Division, PHE Dte. | ORD/001339/2021-2022 | 138/Bon | 18/02/2022 | 15 | UMWELT ENGINEER PVT.LTD. | 4.05 | 0.00 | 1 | |||
| 375 | Barasat Division | Acceptance cum work order for Construction of boundary wall with RCC column & brick masonry & RCC Column structure at Head Work site & PH No- 3 within Kalinagar w/s scheme (Z-I), Sandeshkhali-I block under Hasnabad Sub- Division P.H.E. Dte. | ORD/001339/2023-2024 | 4435/BD | 10/11/2023 | 720 | ABDUL HAMID GAZI. | 31.93 | 0.00 | 80 | |||
| 376 | Barasat Division | Route Survey, Design Drawing & Preparation of DPR for Kurulia (Zone-II) Water Supply Scheme in Bagdah Block within the Jurisdiction of Bongaon Sub-Division under Barasat Division, PHE Dte. | ORD/001340/2021-2022 | 139/Bon | 18/02/2022 | 15 | UMWELT ENGINEER PVT.LTD. | 3.86 | 3.86 | 1 | |||
| 377 | Barasat Division | Hiring of 1(one) no Luxury Car (Diesel/Driven) for the office use of the Assistant Engineer Bongaon Sub-Division, P.H.E. Dte. Under Barasat Division P.H.E. Dte. (Period from:-01/02/2023 to 31/07/2023). | ORD/001341/2022-2023 | 99/Bon | 31/01/2023 | 181 | ROY ENGINEERS. | 0.86 | 1.26 | 100 | |||
| 378 | Barasat Division | Route Survey, Design Drawing & Preparation of DPR for Malidah Water Supply Scheme in Bagdah Block within the Jurisdiction of Bongaon Sub-Division under Barasat Division, PHE Dte. | ORD/001343/2021-2022 | 140/Bon | 18/02/2022 | 15 | SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. | 3.74 | 0.00 | 1 | |||
| 379 | Barasat Division | Route Survey, Design Drawing & Preparation of DPR for Diara Water Supply Scheme in Bagdah Block within the Jurisdiction of Bongaon Sub-Division under Barasat Division, PHE Dte. | ORD/001344/2021-2022 | 141/Bon | 18/02/2022 | 15 | SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. | 4.08 | 4.07 | 1 | |||
| 380 | Barasat Division | Hiring Diesel Luxury Car on daily basis (for 12 months from 01.07.2022 to 30.06.2023) for the office use of the Assistant Engineer, Basirhat Sub-Division P.H.E. Dte. | ORD/001344/2022-2023 | 857/BHT | 27/06/2022 | 365 | DEB KUMAR DAS. | 1.73 | 1.84 | 0 | |||
| 381 | Barasat Division | Hiring of 1 no. of Diesel Luxury Car (Euro ¿ IV/VI) in good condition (traffic worthy) on daily basis for office use of the Assistant Engineer, Habra Sub-Division, P.H.E. Dte. (For the period from : 01.12.2022 to 30.11.2023) | ORD/001346/2022-2023 | 660/HAB | 30/11/2022 | 365 | M/S LATIKA CONSTRUCTION. | 1.73 | 4.40 | 40 | |||
| 382 | Barasat Division | Route Survey, Design Drawing & Preparation of DPR for Ichhapur Water Supply Scheme in Gaighata Block within the Jurisdiction of Bongaon Sub-Division under Barasat Division, PHE Dte. | ORD/001349/2021-2022 | 145/Bon | 18/02/2022 | 15 | SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. | 4.21 | 4.19 | 1 | |||
| 383 | Barasat Division | Acceptance cum work order for Construction of boundary wall with RCC column structure at Head Work (Ph No-1) site within Rampur w/s scheme, Sandeshkhali-II block under Hasnabad Sub- Division P.H.E. Dte. | ORD/001349/2023-2024 | 4438/BD | 10/11/2023 | 90 | BASIRHAT ANCHALICK SHARAMICK THIKADARY SAMABAY SAMITY LTD. | 22.05 | 20.63 | 100 | |||
| 384 | Barasat Division | Route Survey, Design Drawing & Preparation of DPR for Chikanpara Water Supply Scheme in Gaighata Block within the Jurisdiction of Bongaon Sub-Division under Barasat Division, PHE Dte. | ORD/001351/2021-2022 | 147/Bon | 18/02/2022 | 15 | SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. | 4.37 | 4.37 | 1 | |||
| 385 | Barasat Division | Hiring of 1(one) no Luxury Car (Diesel/Driven) for the office use of the Assistant Engineer Bongaon Sub-Division, P.H.E. Dte. Under Barasat Division P.H.E. Dte. (Period from:-01/02/2022 to 31/01/2023). | ORD/001396/2021-2022 | 45/Bon | 31/01/2022 | 1 | ROY ENGINEERS. | 1.73 | 1.68 | 1 | |||
| 386 | Barasat Division | Acceptance cum work order for Construction of additional 1 no. switch room cum chlorine room (5.40x3.60) with sanitary and water supply arrangement including plinth protection within Bhangatushkhali w/s scheme, Sandeshkhali-II block under Hasnabad Sub-Division, P.H.E. Dte. | ORD/001419/2024-2025 | 143/BD | 13/01/2025 | 75 | PRITAM MUKHOPADHYAY. | 8.88 | 0.00 | 0 | |||
| 387 | Barasat Division | Acceptance cum work order for Construction of approach road & other allied works at Head Work site (PH No.-1) within Rampur w/s scheme, Sandeshkhali-II block under Hasnabad Sub-Division P.H.E. Dte | ORD/001427/2021-2022 | 526/BD | 23/02/2022 | 990 | BASIRHAT ANCHALICK SHARAMICK THIKADARY SAMABAY SAMITY LTD. | 31.47 | 13.57 | 100 | |||
| 388 | Barasat Division | Acceptance cum work order for Construction of boundary wall at OHR site & CWR site (PH No.-3) within Hingalganj w/s scheme (Zone-II), Hingalganj block under Hasnabad Sub-Division P.H.E. Dte. | ORD/001436/2021-2022 | 527/BD | 23/02/2022 | 30 | ABDUL HAMID GAZI. | 22.43 | 20.86 | 1 | |||
| 389 | Barasat Division | Acceptance cum work order for Construction of boundary wall at OHR site & CWR site with approach road at CWR site within Hingalganj w/s scheme (Zone-I), Hingalganj block under Hasnabad Sub-Division P.H.E. Dte. | ORD/001444/2021-2022 | 528/BD | 23/02/2022 | 30 | PRITAM MUKHOPADHYAY. | 19.65 | 15.84 | 1 | |||
| 390 | Barasat Division | Repairing & Renovation of 1 No. Pump House (P.H. No-II) and allied works at Sohai Swetpur Water Supply Scheme Zone-I under Barasat Sub-Division, P.H.E.Dte. Sl. No.-7 | ORD/001469/2021-2022 | 817/BSD | 10/12/2021 | 30 | JIBON BOSE. | 1.25 | 1.10 | 0 | |||
| 391 | Barasat Division | Hiring of 1(one) no Luxury Car (Diesel/Driven) for the office use of the Assistant Engineer Bongaon Sub-Division, P.H.E. Dte. Under Barasat Division P.H.E. Dte. (Period from:-01/02/2023 to 31/07/2023). | ORD/001480/2022-2023 | 99/.BON | 31/01/2023 | 181 | ROY ENGINEERS. | 0.86 | 0.65 | 100 | |||
| 392 | Barasat Division | Repairing & Renovation of 1 No. Pump House (Size- 5.20 x 7.20) of Head Work Site and allied works at Sohai Swetpur Water Supply Scheme Zone-I under Barasat Sub-Division, P.H.E.Dte. Sl. No.-6 | ORD/001483/2021-2022 | 816/BSD | 10/12/2021 | 30 | M/S S.HAQUE & CO. | 1.84 | 1.74 | 0 | |||
| 393 | Barasat Division | Acceptance cum work order for Protection of UPVC distribution pipeline by UC bullah pile at different places for protection of different dia UPVC distribution pipe line within Bermajur w/s scheme, Sandeshkhali-II block under Hasnabad Sub- Division P.H.E. Dte. | ORD/001526/2021-2022 | 1865/HSD | 17/11/2021 | 15 | M/S NIRMAN CONSTRUCTION. | 4.79 | 4.77 | 1 | |||
| 394 | Barasat Division | Repairing & Renovation of 1 No. Pump House (Size- 5.20 x 7.20) of Head Work Site and allied works at Bodai Water Supply Scheme Zone-I under Barasat Sub-Division, P.H.E.Dte. Sl. No.-1 | ORD/001542/2021-2022 | 805/BSD | 06/12/2021 | 30 | PURBA SERVICES | 1.84 | 1.75 | 0 | |||
| 395 | Barasat Division | Acceptance cum work order for Construction of Anchor block for resting of 100 mm dia DI Distribution main for low areas at different places within Rupmari w/s scheme, Hingalganj Block under Hasnabad Sub-Division P.H.E. Dte. | ORD/001644/2021-2022 | 400/HSD | 04/03/2022 | 15 | M/S PROGATI ENTERPRISE. | 3.86 | 3.86 | 1 | |||
| 396 | Barasat Division | Acceptance cum work order for Laying of 100 mm dia. DI distribution main from near PH No-3 towards Halda more for damage portion within Rupmari w/s scheme (Zone-III), Hingalganj Block under Hasnabad Sub- Division P.H.E. Dte. | ORD/001646/2021-2022 | 402/HSD | 04/03/2022 | 10 | M/S PROGATI ENTERPRISE. | 1.53 | 1.53 | 1 | |||
| 397 | Barasat Division | Acceptance cum work order for Protection of newly laid UPVC pipe line for providing FHTC by bamboo pilling at different places within Rupmari w/s scheme, Hingalganj block under Hasnabad Sub- Division P.H.E. Dte. | ORD/001647/2021-2022 | 403/HSD | 04/03/2022 | 10 | M/S DATTA ENTERPRISE. | 4.93 | 4.91 | 1 | |||
| 398 | Barasat Division | Acceptance cum work order for Protection of newly laid different dia. UPVC distribution pipeline for providing FHTC by UC bullah pile at different places within Rupmari w/s scheme, Hingalganj block under Hasnabad Sub- Division P.H.E. Dte. | ORD/001648/2021-2022 | 404/HSD | 04/03/2022 | 10 | M/S PROGATI ENTERPRISE. | 4.95 | 5.00 | 1 | |||
| 399 | Barasat Division | Acceptance cum work order for Construction of Anchor block for resting of different dia DI Rising/Distribution main for low areas at different places for Rejuvenation of Baunia Abad w/s scheme, Sandeshkhali-I Block under Hasnabad Sub-Division P.H.E. Dte. (Part-A) | ORD/001661/2021-2022 | 415/HSD | 04/03/2022 | 15 | M/S PROGATI ENTERPRISE. | 4.71 | 0.00 | 1 | |||
| 400 | Barasat Division | Acceptance cum work order for Construction of Anchor block for resting of different dia DI Rising/Distribution main for low areas at different places for Rejuvenation of Baunia Abad w/s scheme, Sandeshkhali-I Block under Hasnabad Sub-Division P.H.E. Dte. (Part-B) | ORD/001662/2021-2022 | 416/HSD | 04/03/2022 | 15 | M/S DATTA ENTERPRISE. | 4.04 | 4.04 | 1 | |||
| 401 | Barasat Division | Acceptance cum work order for Protection of newly laid UPVC pipe line by bamboo pilling at different places for Rejuvenation of Monipur w/s scheme, Sandeshkhali-II block under Hasnabad Sub- Division P.H.E. Dte. | ORD/001666/2021-2022 | 420/HSD | 04/03/2022 | 10 | UNIFIED ENGINEERS' CO-OPERATIVE SOCIETYLTD. | 4.82 | 4.98 | 1 | |||
| 402 | Barasat Division | Acceptance cum work order for Protection of newly laid different dia. UPVC distribution pipeline for providing FHTC by UC bullah pile at different places within Bouthakurani w/s scheme (Zone-I to III), Sandeshkhali-II block under Hasnabad Sub- Division P.H.E. Dte. | ORD/001667/2021-2022 | 421/HSD | 04/03/2022 | 10 | SRI KRISHNA CO-OP-LABOUR CONTRACT AND CONST SOC LTD. | 4.73 | 4.78 | 1 | |||
| 403 | Barasat Division | Acceptance cum work order for Protection of newly laid different dia. UPVC distribution pipeline for providing FHTC by UC bullah pile at different places within Bouthakurani w/s scheme (Zone-IV to V), Sandeshkhali-II block under Hasnabad Sub- Division P.H.E. Dte. | ORD/001668/2021-2022 | 422/HSD | 04/03/2022 | 10 | SRI KRISHNA CO-OP-LABOUR CONTRACT AND CONST SOC LTD. | 4.73 | 4.73 | 1 | |||
| 404 | Barasat Division | Acceptance cum work order for Construction of additional 1 no. switch room cum chlorine room (5.40x3.60) with sanitary and water supply arrangement including plinth protection at Joygopalpur tail end within Tushkhali w/s scheme, Sandeshkhali-II block under Hasnabad Sub-Division, P.H.E. Dte. | ORD/001704/2024-2025 | 951/BD | 25/03/2025 | 75 | SABIR ALI GAZI | 8.92 | 0.00 | 0 | |||
| 405 | Barasat Division | Acceptance cum work order for Emergent restoration of existing pilling works to sustain the protection of UPVC distribution pipe line at different places within Khulna Bhanderkhali w/s scheme (Zone-I), Sandeshkhali-II block under Hasnabad Sub- Division P.H.E. Dte. | ORD/001719/2021-2022 | 1981/HSD | 02/12/2021 | 10 | M/S NIRMAN CONSTRUCTION. | 3.54 | 3.54 | 1 | |||
| 406 | Barasat Division | Acceptance cum work order for Additional Laying of 63 mm dia. UPVC pipe line for Providing FHTC in connection with JJM and Jal Swapna at diff. places in Parghumti Mouza within Kalitala W/S scheme, Hingalganj block under Hasnabad Sub-Division within Barasat Division, PHE Dte. | ORD/001720/2021-2022 | 257/HSD | 07/02/2022 | 10 | MONDAL & CO. (BASIRHAT). | 4.52 | 4.52 | 1 | |||
| 407 | Barasat Division | Acceptance cum work order for Providing Functional Household Tap Connection (FHTC) for left out house holds under the command area of Kalinagar water supply scheme (Z-I) in order to provide Har Ghar Jal Certification, Sandeshkhali-I Block under Hasnabad Sub-Division, PHE Dte. | ORD/001730/2023-2024 | 429/BD | 09/02/2024 | 30 | ABDUL ALIM MONDAL. | 70.78 | 44.11 | 75 | |||
| 408 | Barasat Division | Acceptance cum Work Order for Providing Functional Household Tap Connection (FHTC) in connection with Jal Jeevan Mission (JJM and Jal Swapna) under command area of Gadpukuria Water Supply Scheme at Bagdah Block under Barasat Division, PHE Dte. (Phase-II). | ORD/001732/2020-2021 | 423/BD. | 19/02/2021 | 45 | M/S S.S.ENTERPRISE. (SOUTH) | 84.66 | 49.40 | 1 | |||
| 409 | Barasat Division | Acceptance cum work order for Supply of sluice valve i/c Construction of Sluice valve chamber and other allied works at different location within Bouthakurani w/s scheme, Sandeshkhali-II Block under Hasnabad Sub- Division P.H.E. Dte. | ORD/001748/2021-2022 | 464/HSD | 10/03/2022 | 10 | R.K.MANDAL AND CO. | 3.39 | 3.39 | 1 | |||
| 410 | Barasat Division | Acceptance cum work order for Protection of newly laid UPVC pipe line for providing FHTC by bamboo pilling at different places within Bouthakurani w/s scheme, Sandeshkhali-II block under Hasnabad Sub- Division P.H.E. Dte. | ORD/001750/2021-2022 | 465/HSD | 10/03/2022 | 10 | R.K.MANDAL AND CO. | 4.85 | 4.85 | 1 | |||
| 411 | Barasat Division | Acceptance cum work order for Protection of newly laid different dia. UPVC distribution pipeline for providing FHTC by UC bullah pile at different places within Bermajur w/s scheme, Sandeshkhali-II block under Hasnabad Sub- Division P.H.E. Dte. | ORD/001759/2021-2022 | 470/HSD | 10/03/2022 | 10 | ARBINA ENTERPRISE. | 3.89 | 3.88 | 1 | |||
| 412 | Barasat Division | Formal work order for "Providing Functional Household Tap Connection (FHTC) from existing and new proposed distribution system within the command area Malatipur & Chaita (Part) Mouzas under Sadiknagar Zone - II Water Supply Scheme at Basirhat - II Block Under Barasat Division, PHE Dte. | ORD/001760/2020-2021 | 495/BD. | 26/02/2021 | 90 | ORIENT CONSTRUCTION. | 97.09 | 56.62 | 1 | |||
| 413 | Barasat Division | Acceptance cum work order for Protection of newly laid different dia. UPVC distribution pipeline for providing FHTC by UC bullah pile at different places within Fakirtakia w/s scheme, Sandeshkhali-I block under Hasnabad Sub- Division P.H.E. Dte. (Part-A) | ORD/001761/2021-2022 | 471/HSD | 10/03/2022 | 10 | JESMINE ENTERPRISE. | 3.82 | 3.82 | 1 | |||
| 414 | Barasat Division | Acceptance cum work order for Protection of newly laid different dia. UPVC distribution pipeline for providing FHTC by UC bullah pile at different places within Fakirtakia w/s scheme, Sandeshkhali-I block under Hasnabad Sub- Division P.H.E. Dte. (Part-B) | ORD/001762/2021-2022 | 472/HSD | 10/03/2022 | 10 | M/S MITRA CONSTRUCTION. | 3.89 | 3.89 | 1 | |||
| 415 | Barasat Division | Acceptance cum work order for Emergency repairing of existing FHTC along with pipe line in connection with retrofitting work at different places of Kanmari mouza within Kanmari w/s scheme (Z-I), Sandeshkhali-I block under Hasnasbad Sub-Division, P.H.E.Dte. | ORD/001813/2023-2024 | 231/HSD | 29/02/2024 | 10 | SARKAR ENTERPRISE | 0.93 | 0.93 | 100 | |||
| 416 | Barasat Division | Acceptance cum work order for Emergency repairing of existing FHTC along with pipe line in connection with retrofitting work at different places of Nalkora mouza within Kanmari w/s scheme (Z-I), Sandeshkhali-I block under Hasnasbad Sub-Division, P.H.E.Dte. | ORD/001815/2023-2024 | 232/HSD | 29/02/2024 | 10 | SARKAR ENTERPRISE | 0.93 | 0.93 | 100 | |||
| 417 | Barasat Division | Acceptance cum work order for Emergency repairing of existing FHTC along with pipe line in connection with retrofitting work at different places of Hatgachi mouza within Kanmari w/s scheme (Z-II), Sandeshkhali-I block under Hasnasbad Sub-Division, P.H.E.Dte. | ORD/001816/2023-2024 | 233/HSD | 29/02/2024 | 10 | M/S PROGATI ENTERPRISE. | 0.94 | 0.94 | 100 | |||
| 418 | Barasat Division | Acceptance cum work order for Emergency repairing of existing FHTC along with pipe line in connection with retrofitting work at different places of Nazat mouza within Kanmari w/s scheme (Z-II), Sandeshkhali-I block under Hasnasbad Sub-Division, P.H.E.Dte. | ORD/001818/2023-2024 | 234/HSD | 29/02/2024 | 10 | M/S PROGATI ENTERPRISE. | 0.95 | 0.95 | 100 | |||
| 419 | Barasat Division | Work Order for Providing Functional Household Tap Connection (FHTC) in connection with Jal Jeevan Mission (JJM and Jal Swapna) under command area of Talsa & Adjoining Mouzas Water Supply Scheme at Habra-II Block under Barasat Division, PHE Dte. (Phase-II). | ORD/001841/2020-2021 | 388/BD. | 18/02/2021 | 90 | PUSPA ENTERPRISE. | 84.95 | 20.23 | 1 | |||
| 420 | Barasat Division | Acceptance cum Work Order for Providing Functional Household Tap Connection (FHTC) from existing and new proposed distribution system within the command area of Shankarpur Supply Scheme at Basirhat-I Block under Barasat Division, PHE Dte. | ORD/001842/2020-2021 | 488/BD. | 26/02/2021 | 90 | UMWELT ENGINEER PVT.LTD. | 96.90 | 27.67 | 1 | |||
| 421 | Barasat Division | Acceptance cum Work Order for Providing Functional Household Tap Connection (FHTC) in different mouza including laying of UPVC/PVC pipe line and necessary fittings within Gabberia Water Supply Scheme at Sandeshkhali-II Block under Hsnabad Sub-Division, PHE Dte.(Phase-I) | ORD/001851/2020-2021 | 435/BD. | 22/02/2021 | 30 | DEBAPRASAD MONDAL. | 77.80 | 32.86 | 1 | |||
| 422 | Barasat Division | Acceptance cum work order for Protection of HDPE rising main pipe line by bamboo piling from near Krishnapada Smriti More to N/H/O Ramesh Gayen for Rejuvenation of Durgapur Baylani w/s scheme (Zone-I), Hingalganj Block under Hasnabad Sub-Division, PHE Dte. | ORD/001924/2021-2022 | 527/HSD | 15/03/2022 | 10 | MONDAL & CO. (BASIRHAT). | 4.47 | 4.47 | 1 | |||
| 423 | Barasat Division | Route Survey, Design Drawing & DPR Preparation for ITINDA PANITOR Water Supply Scheme in Basirhat-I Block under Barasat Division, PHE Dte. | ORD/001933/2021-2022 | 189/BHTSD | 28/02/2022 | 15 | SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. | 4.84 | 4.84 | 1 | |||
| 424 | Barasat Division | Route Survey, Design Drawing & DPR Preparation for PIFA Water Supply Scheme in Basirhat-I Block under Barasat Division, PHE Dte. | ORD/001934/2021-2022 | 190/BHTSD | 28/02/2022 | 15 | SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. | 3.73 | 3.65 | 1 | |||
| 425 | Barasat Division | Route Survey, Design Drawing & DPR Preparation for DEBHOG Water Supply Scheme in Basirhat-I Block under Barasat Division, PHE Dte. | ORD/001935/2021-2022 | 191/BHTSD | 28/02/2022 | 15 | SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. | 3.70 | 3.60 | 1 | |||
| 426 | Barasat Division | Route Survey, Design Drawing & DPR Preparation for SANKARPUR Water Supply Scheme in Basirhat-I Block under Barasat Division, PHE Dte. | ORD/001936/2021-2022 | 192/BHTSD | 28/02/2022 | 15 | SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. | 4.24 | 4.24 | 1 | |||
| 427 | Barasat Division | Route Survey, Design Drawing & DPR Preparation for GOTRA Water Supply Scheme in Basirhat-I Block under Barasat Division, PHE Dte. | ORD/001940/2021-2022 | 196/BHTSD | 28/02/2022 | 15 | SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. | 4.30 | 4.16 | 1 | |||
| 428 | Barasat Division | Route Survey, Design Drawing & DPR Preparation for PASCHIM MADHYAMPUR Water Supply Scheme in Basirhat-I Block under Barasat Division, PHE Dte. | ORD/001941/2021-2022 | 197/BHTSD | 28/02/2022 | 15 | SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. | 4.24 | 0.00 | 1 | |||
| 429 | Barasat Division | Route Survey, Design Drawing & DPR Preparation for BANSJHARI MALLIKPUR Water Supply Scheme in Basirhat-I Block under Barasat Division, PHE Dte. | ORD/001942/2021-2022 | 198/BHTSD | 28/02/2022 | 15 | SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. | 3.29 | 3.27 | 1 | |||
| 430 | Barasat Division | Route Survey, Design Drawing & DPR Preparation for GACHHARATI Water Supply Scheme in Basirhat-I Block under Barasat Division, PHE Dte. | ORD/001943/2021-2022 | 199/BHTSD | 28/02/2022 | 15 | SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. | 2.69 | 0.00 | 1 | |||
| 431 | Barasat Division | Route Survey, Design Drawing & DPR Preparation for DAKSHIN BAGUNDI Water Supply Scheme in Basirhat-I Block under Barasat Division, PHE Dte. | ORD/001944/2021-2022 | 200/BHTSD | 28/02/2022 | 15 | SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. | 2.76 | 2.63 | 1 | |||
| 432 | Barasat Division | Route Survey, Design Drawing & DPR Preparation for SANKCHURA Water Supply Scheme in Basirhat-I Block under Barasat Division, PHE Dte. | ORD/001945/2021-2022 | 201/BHTSD | 28/02/2022 | 15 | SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. | 4.37 | 4.25 | 1 | |||
| 433 | Barasat Division | Route Survey, Design Drawing & DPR Preparation for NALKORA Water Supply Scheme in Basirhat-I Block under Barasat Division, PHE Dte. | ORD/001946/2021-2022 | 202/BHTSD | 28/02/2022 | 15 | SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. | 2.79 | 0.00 | 1 | |||
| 434 | Barasat Division | Continuation Work Order for Hiring of 1(one) number vehicle of Category Motor Cab/Maruti Omni(standard)(Non Air-Conditioned)/LPG/CNG Engine including Driver for performing the inspection works and official duties for the office of the Assistant Engineer, Barrackpore Sub-Division, P.H.E. Dte. at Barrackpore, Kolkata-700122, District- North 24Pgns, W.B.(Period from 01.02. 2024 to 31.07.2024) | ORD/001946/2023-2024 | 43/BKP | 22/01/2024 | 182 | GOPAL SINGHA. | 0.86 | 1.95 | 100 | |||
| 435 | Barasat Division | Route Survey, Design Drawing & DPR Preparation for ZAFARPUR Water Supply Scheme in Basirhat-II Block under Barasat Division, PHE Dte. | ORD/001947/2021-2022 | 203/BHTSD | 28/02/2022 | 15 | SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. | 4.30 | 4.19 | 1 | |||
| 436 | Barasat Division | Route Survey, Design Drawing & DPR Preparation for GOBINDAPUR DHOKRA Water Supply Scheme in Basirhat-II Block under Barasat Division, PHE Dte. | ORD/001949/2021-2022 | 205/BHTSD | 28/02/2022 | 15 | SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. | 3.86 | 0.00 | 1 | |||
| 437 | Barasat Division | Route Survey, Design Drawing & DPR Preparation for SADIKNAGAR-I Water Supply Scheme in Basirhat-II Block under Barasat Division, PHE Dte. | ORD/001950/2021-2022 | 206/BHTSD | 28/02/2022 | 15 | SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. | 4.15 | 0.00 | 1 | |||
| 438 | Barasat Division | Route Survey, Design Drawing & DPR Preparation for SADIKNAGAR-II Water Supply Scheme in Basirhat-II Block under Barasat Division, PHE Dte. | ORD/001951/2021-2022 | 207/BHTSD | 28/02/2022 | 15 | SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. | 3.51 | 3.50 | 1 | |||
| 439 | Barasat Division | Route Survey, Design Drawing & DPR Preparation for AKIPUR Water Supply Scheme in Basirhat-II Block under Barasat Division, PHE Dte. | ORD/001953/2021-2022 | 304/BHTSD | 07/03/2022 | 15 | SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. | 3.02 | 2.95 | 1 | |||
| 440 | Barasat Division | Route Survey, Design Drawing & DPR Preparation for MAMINPUR Water Supply Scheme in Basirhat-II Block under Barasat Division, PHE Dte. | ORD/001954/2021-2022 | 305/BHTSD | 07/03/2022 | 15 | SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. | 3.15 | 0.00 | 1 | |||
| 441 | Barasat Division | Route Survey, Design Drawing & DPR Preparation for EOJNAGAR Water Supply Scheme in Basirhat-II Block under Barasat Division, PHE Dte. | ORD/001955/2021-2022 | 306/BHTSD | 07/03/2022 | 15 | SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. | 3.94 | 3.86 | 1 | |||
| 442 | Barasat Division | Route Survey, Design Drawing & DPR Preparation for MIRZANAGAR Water Supply Scheme in Basirhat-II Block under Barasat Division, PHE Dte. | ORD/001956/2021-2022 | 307/BHTSD | 07/03/2022 | 15 | SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. | 3.78 | 3.69 | 1 | |||
| 443 | Barasat Division | Route Survey, Design Drawing & DPR Preparation for KACHUA SWARUPNAGAR Water Supply Scheme in Basirhat-II Block under Barasat Division, PHE Dte. | ORD/001957/2021-2022 | 308/BHTSD | 07/03/2022 | 15 | SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. | 4.29 | 4.07 | 1 | |||
| 444 | Barasat Division | Route Survey, Design Drawing & DPR Preparation for GHONA Water Supply Scheme in Basirhat-II Block under Barasat Division, PHE Dte. | ORD/001958/2021-2022 | 309/BHTSD | 07/03/2022 | 15 | SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. | 3.15 | 3.15 | 1 | |||
| 445 | Barasat Division | Route Survey, Design Drawing & DPR Preparation for DHOPABERIA Water Supply Scheme in Basirhat-II Block under Barasat Division, PHE Dte. | ORD/001959/2021-2022 | 310/BHTSD | 07/03/2022 | 15 | SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. | 3.60 | 3.60 | 1 | |||
| 446 | Barasat Division | Route Survey, Design Drawing & DPR Preparation for RAJENDRAPUR Water Supply Scheme in Basirhat-II Block under Barasat Division, PHE Dte. | ORD/001960/2021-2022 | 311/BHTSD | 07/03/2022 | 15 | SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. | 4.19 | 0.00 | 1 | |||
| 447 | Barasat Division | Route Survey, Design Drawing & DPR Preparation for DAKSHIN DEBIPUR Water Supply Scheme in Basirhat-II Block under Barasat Division, PHE Dte. | ORD/001961/2021-2022 | 312/BHTSD | 07/03/2022 | 15 | SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. | 2.87 | 0.00 | 1 | |||
| 448 | Barasat Division | Route Survey, Design Drawing & DPR Preparation for MATHURAPUR Water Supply Scheme in Basirhat-II Block under Barasat Division, PHE Dte. | ORD/001967/2021-2022 | 341/BHTSD | 14/03/2022 | 15 | SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. | 3.50 | 3.50 | 1 | |||
| 449 | Barasat Division | Route Survey, Design Drawing & DPR Preparation for SRINAGAR Water Supply Scheme in Basirhat-II Block under Barasat Division, PHE Dte. | ORD/001968/2021-2022 | 342/BHTSD | 14/03/2022 | 15 | SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. | 4.10 | 0.00 | 1 | |||
| 450 | Barasat Division | Route Survey, Design Drawing & DPR Preparation for RAHARHATI Water Supply Scheme in Basirhat-II Block under Barasat Division, PHE Dte. | ORD/001969/2021-2022 | 343/BHTSD | 14/03/2022 | 15 | SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. | 3.34 | 2.97 | 1 | |||
| 451 | Barasat Division | Route Survey, Design Drawing & DPR Preparation for CHAMPAPUKURIA Water Supply Scheme in Basirhat-II Block under Barasat Division, PHE Dte. | ORD/001970/2021-2022 | 344/BHTSD | 14/03/2022 | 15 | SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. | 3.43 | 3.42 | 1 | |||
| 452 | Barasat Division | Route Survey, Design Drawing & DPR Preparation for RAGHUNATHPUR Water Supply Scheme in Basirhat-II Block under Barasat Division, PHE Dte. | ORD/001971/2021-2022 | 345/BHTSD | 14/03/2022 | 15 | SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. | 3.11 | 3.10 | 1 | |||
| 453 | Barasat Division | Route Survey, Design Drawing & DPR Preparation for DHANYAKURIA Water Supply Scheme in Basirhat-II Block under Barasat Division, PHE Dte. | ORD/001973/2021-2022 | 346/BHTSD | 14/03/2022 | 15 | SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. | 4.79 | 4.79 | 1 | |||
| 454 | Barasat Division | Additional Route Survey work for DPR Preparation for DHANYAKURIA Water Supply Scheme in Basirhat-II Block under Barasat Division, PHE Dte. | ORD/001975/2021-2022 | 347/BHTSD | 14/03/2022 | 15 | SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. | 1.25 | 1.25 | 1 | |||
| 455 | Barasat Division | Route Survey, Design Drawing & DPR Preparation for MAGURALI Water Supply Scheme in Baduria Block under Barasat Division, PHE Dte. | ORD/001978/2021-2022 | 350/BHTSD | 14/03/2022 | 15 | SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. | 4.96 | 4.96 | 1 | |||
| 456 | Barasat Division | Route Survey, Design Drawing & DPR Preparation for BAJITPUR ZONE 1 Water Supply Scheme in Baduria Block under Barasat Division, PHE Dte. | ORD/001981/2021-2022 | 353/BHTSD | 14/03/2022 | 15 | SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. | 4.97 | 4.97 | 1 | |||
| 457 | Barasat Division | Additional Survey work for DPR Preparation for BAJITPUR ZONE -1 Water Supply Scheme in Baduria Block under Barasat Division, PHE Dte. | ORD/001982/2021-2022 | 354/BHTSD | 14/03/2022 | 15 | SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. | 0.63 | 0.61 | 1 | |||
| 458 | Barasat Division | Route Survey, Design Drawing & DPR Preparation for BAJITPUR ZONE -2 Water Supply Scheme in Baduria Block under Barasat Division, PHE Dte. | ORD/001983/2021-2022 | 355/BHTSD | 14/03/2022 | 15 | SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. | 3.74 | 3.72 | 1 | |||
| 459 | Barasat Division | Route Survey, Design Drawing & DPR Preparation for ARSULA Water Supply Scheme in Baduria Block under Barasat Division, PHE Dte. | ORD/001987/2021-2022 | 359/BHTSD | 14/03/2022 | 15 | SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. | 3.34 | 3.34 | 1 | |||
| 460 | Barasat Division | Route Survey, Design Drawing & DPR Preparation for GOKNA Water Supply Scheme in Baduria Block under Barasat Division, PHE Dte. | ORD/001988/2021-2022 | 360/BHTSD | 14/03/2022 | 15 | SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. | 4.96 | 4.96 | 1 | |||
| 461 | Barasat Division | Acceptance cum work order for Supply of sluice valve i/c Construction of Sluice valve chamber and other allied works at different location within Rupmari w/s scheme (For Zone-IV to VI), Hingalganj block under Hasnabad Sub- Division P.H.E. Dte. | ORD/001989/2021-2022 | 253/HSD | 07/02/2022 | 10 | M/S DATTA ENTERPRISE. | 4.86 | 3.46 | 1 | |||
| 462 | Barasat Division | Acceptance cum work order for Supply of sluice valve i/c Construction of Sluice valve chamber and other allied works at different location within Rupmari w/s scheme (For Zone-I to III), Hingalganj block under Hasnabad Sub- Division P.H.E. Dte. | ORD/001990/2021-2022 | 256/HSD | 07/02/2022 | 10 | M/S PROGATI ENTERPRISE. | 3.46 | 3.46 | 1 | |||
| 463 | Barasat Division | Additional Survey work for DPR Preparation for GOKNA Water Supply Scheme in Baduria Block under Barasat Division, PHE Dte. | ORD/001991/2021-2022 | 361/BHTSD | 14/03/2022 | 15 | SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. | 4.59 | 4.53 | 1 | |||
| 464 | Barasat Division | Acceptance cum work order for Additional Land development at Head Work Site within Hingalganj w/s scheme (Z-I), Hingalganj block under Hasnabad Sub-Division P.H.E. Dte. | ORD/001992/2021-2022 | 1664/HSD | 05/10/2021 | 10 | MONDAL & CO. (BASIRHAT). | 4.85 | 4.84 | 1 | |||
| 465 | Barasat Division | Route Survey, Design Drawing & DPR Preparation for KULIA Water Supply Scheme in Baduria Block under Barasat Division, PHE Dte. | ORD/001993/2021-2022 | 374/BHTSD | 16/03/2022 | 15 | SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. | 2.77 | 2.77 | 1 | |||
| 466 | Barasat Division | Route Survey, Design Drawing & DPR Preparation for MASIA-NABASTIA Water Supply Scheme in Baduria Block under Barasat Division, PHE Dte. | ORD/001994/2021-2022 | 375/BHTSD | 16/03/2022 | 15 | SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. | 3.22 | 3.19 | 1 | |||
| 467 | Barasat Division | Additional survey work for DPR Preparation for SIMLA DURGAPUR Water Supply Scheme in Baduria Block under Barasat Division, PHE Dte. | ORD/001996/2021-2022 | 377/BHTSD | 16/03/2022 | 15 | SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. | 1.66 | 0.00 | 1 | |||
| 468 | Barasat Division | Route Survey, Design Drawing & DPR Preparation for Deora W/S Scheme in Swarupnagar Block under Barasat Division, P.H.E. Dte. | ORD/002023/2021-2022 | 126/HAB | 16/03/2022 | 10 | SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. | 3.23 | 3.19 | 1 | |||
| 469 | Barasat Division | Route Survey, Design Drawing & DPR Preparation for Ashudi W/S Scheme in Habra - II Block under Barasat Division, P.H.E. Dte. | ORD/002024/2021-2022 | 127/HAB | 16/03/2022 | 10 | SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. | 3.13 | 3.09 | 1 | |||
| 470 | Barasat Division | Route Survey, Design Drawing & DPR Preparation for Matiagacha W/S Scheme in Habra - II Block under Barasat Division, P.H.E. Dte. | ORD/002025/2021-2022 | 128/HAB | 16/03/2022 | 10 | SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. | 3.35 | 0.00 | 1 | |||
| 471 | Barasat Division | Route Survey, Design Drawing & DPR Preparation for Sindrani (Zone-I) Water Supply Scheme under Bongaon Sub-Division, under Barasat Division, PHE Dte. | ORD/002033/2021-2022 | 609/Bon | 31/12/2021 | 20 | UMWELT ENGINEER PVT.LTD. | 4.14 | 4.14 | 1 | |||
| 472 | Barasat Division | Formal work order for Providing Functional Household Tap Connection(FHTC) from existing and new proposed distribution system within the command area of Kapileswarpur Water Supply Scheme at Swarupnagar Block under Barasat Division, PHE Dte. (Phase - I) | ORD/002034/2021-2022 | 940/BD | 28/03/2022 | 90 | SRI KRISHNA CO-OP-LABOUR CONTRACT AND CONST SOC LTD. | 164.90 | 108.96 | 1 | |||
| 473 | Barasat Division | Acceptance cum work order for Route Survey, Design Drawing & DPR Preparation for Khulna Bhandarkhali Zone-I Water Supply Scheme under Barasat Division, PHE Dte. | ORD/002035/2021-2022 | 2177/HSD | 28/12/2021 | 21 | SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. | 3.92 | 3.93 | 1 | |||
| 474 | Barasat Division | Acceptance cum work order for Route Survey, Design Drawing & DPR Preparation for Dakshin Bhebia Zone-I Water Supply Scheme under Barasat Division, PHE Dte. | ORD/002036/2021-2022 | 2183/HSD | 28/12/2021 | 21 | SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. | 4.49 | 4.49 | 1 | |||
| 475 | Barasat Division | Acceptance cum work order for Route Survey, Design Drawing & DPR Preparation for Kumarjole Water Supply Scheme under Barasat Division, PHE Dte. | ORD/002037/2021-2022 | 2171/HSD | 28/12/2021 | 21 | UMWELT ENGINEER PVT.LTD. | 4.24 | 0.00 | 1 | |||
| 476 | Barasat Division | Continuation Work Order for Hiring of 1(one) number vehicle of Category Motor Cab/Maruti Omni(standard)(Non Air-Conditioned)/LPG/CNG Engine including Driver for performing the inspection works and official duties for the office of the Assistant Engineer, Barrackpore Sub- Division, P.H.E. Dte. at Barrackpore, Kolkata-700122, District- North 24Pgns, W.B. | ORD/002038/2023-2024 | 107/BKP | 06/03/2024 | 184 | GOPAL SINGHA. | 0.87 | 2.05 | 100 | |||
| 477 | Barasat Division | Acceptance cum work order for Providing Functional Household Tap Connection (FHTC) in connection with Jal Jeevan Mission (JJM and JAL SWAPNA) under command area of BAGDAH Water Supply Scheme at Bagdah Block under Barasat Division, PHE Dte. (Phase-I) | ORD/002056/2021-2022 | 990/BD. | 27/05/2021 | 45 | UMWELT ENGINEER PVT.LTD. | 89.35 | 18.85 | 1 | |||
| 478 | Barasat Division | Acceptance cum work order for Repair & Renovation work at Head work site in connection with Augmentation of Humaipur Water Supply Scheme under Barasat Sub Division, P.H.E.Dte. | ORD/002061/2024-2025 | 1033/BD | 28/03/2025 | 45 | MUKHERJEE CONSTRUCTION (NADIA) | 19.71 | 0.00 | 0 | |||
| 479 | Barasat Division | Acceptance cum work order for Protection of different dia. UPVC pipe line by UC Bullah pile at different places in Paschim Sandelerbill Uttarpara within Hingalganj W/S/Scheme(Z-II). Hingalganj Block under Hasnabad Sub -Division P.H.E. Dte. | ORD/002069/2021-2022 | 1470/BD. | 13/08/2021 | 15 | M/S B.K.ENTERPRISE. | 15.23 | 2.57 | 1 | |||
| 480 | Barasat Division | Acceptance cum work order for Additional Survey Work For DPR Preparation of Kaniakati Kathalberia Zone I/A & Zone I/B Water Supply Scheme under Barasat Division, PHE Dte. | ORD/002089/2021-2022 | 2145/HSD | 28/12/2021 | 21 | SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. | 1.99 | 1.96 | 1 | |||
| 481 | Barasat Division | Acceptance cum work order Route Survey, Design Drawing & DPR Preparation for Kaniakati Kathalberia Zone I/A & Zone I/B Water Supply Scheme under Barasat Division, PHE Dte. | ORD/002090/2021-2022 | 2144/HSD | 28/12/2021 | 21 | SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. | 4.76 | 4.76 | 1 | |||
| 482 | Barasat Division | Acceptance cum work order for Route Survey, Design Drawing & DPR Preparation for Kaniakati Kathalberia Zone II/A & Zone II/B Water Supply Scheme under Barasat Division, PHE Dte. | ORD/002091/2021-2022 | 2142/HSD | 28/12/2021 | 21 | SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. | 4.76 | 4.73 | 1 | |||
| 483 | Barasat Division | Acceptance cum work order Additional Survey Work For DPR Preparation of Kaniakati Kathalberia Zone II/A & Zone II/B Water Supply Scheme under Barasat Division, PHE Dte. | ORD/002092/2021-2022 | 2143/HSD | 28/12/2021 | 21 | SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. | 2.21 | 2.19 | 1 | |||
| 484 | Barasat Division | Acceptance cum work order for Protection works for newly laid different dia. UPVC/DI pipe line at different places in Sandelerbill mouza within Hingalganj W/S/Scheme(Z-II). Hingalganj Block under Hasnabad Sub -Division P.H.E. Dte | ORD/002093/2021-2022 | 1463/BD. | 13/08/2021 | 15 | M/S PROGATI ENTERPRISE. | 15.81 | 2.48 | 1 | |||
| 485 | Barasat Division | Acceptance cum work order for Construction of Anchor block for resting of different dia DI Rising/Distribution main for low areas at different places for Rejuvenation of Baunia Abad w/s scheme, Sandeshkhali-I Block under Hasnabad Sub-Division P.H.E. Dte. (Part-A) | ORD/002119/2021-2022 | 415/HSD | 04/03/2022 | 15 | M/S PROGATI ENTERPRISE. | 4.71 | 4.71 | 1 | |||
| 486 | Barasat Division | Acceptance cum work order for Protection works for newly laid different dia.UPVC/DI pipe line at different places in Radhanagar laskar para, majher para, Singh para & Tati Para within Chhoto Sehara W/S/Scheme, Sandeshkhali-I Block under Hasnabad Sub-Division P.H.E.Dte. | ORD/002120/2021-2022 | 1467/BD. | 13/08/2021 | 30 | M/S DATTA ENTERPRISE. | 31.60 | 4.63 | 1 | |||
| 487 | Barasat Division | Acceptance cum work order for Protection works for newly laid different dia.UPVC/DI pipe line at different places in Bermajur Taltala Para, Molla para, Hatkhola Para, Dangal para, Kalyani para, Kachari para & Pol para within Bermajur W/S/Scheme Sandeshkhali-II Block under Hasnabad Sub-Division P.H.E.Dte. | ORD/002121/2021-2022 | 1465/BD. | 13/08/2021 | 30 | UNIFIED ENGINEERS' CO-OPERATIVE SOCIETYLTD. | 32.29 | 6.09 | 1 | |||
| 488 | Barasat Division | Acceptance cum work order for Protection works for newly laid different dia.UPVC/DI pipe line at different places in Bankra & Bankra Dobar mouza within Hingalganj W/S/Scheme(Z-II). Hingalganj Block under Hasnabad Sub-Division P.H.E.Dte | ORD/002125/2021-2022 | 1464/BD. | 13/08/2021 | 30 | MONDAL & CO. (BASIRHAT). | 31.68 | 5.28 | 1 | |||
| 489 | Barasat Division | Acceptance cum Work Order for Providing Functional Household Tap Connection (FHTC) in Bankra mouza including laying of UPVC/PVC pipe & supply of necessary fittings within Hingalganj Water Supply Scheme (Zone-II), at Hingalganj Block under Hasnabad Sub-Division, PHE Dte. | ORD/002126/2021-2022 | 1295/BD. | 26/07/2021 | 60 | MONDAL PRECISION PVT.LTD | 115.98 | 100.18 | 1 | |||
| 490 | Barasat Division | Continuation Work Order for Hiring of 1(one) number vehicle of Category Motor Cab/Maruti Omni(standard)(Non Air-Conditioned)/LPG/CNG Engine including Driver for performing the inspection works and official duties for the office of the Assistant Engineer, Barrackpore Sub-Division, P.H.E. Dte. at Barrackpore, Kolkata-700122, District- North 24Pgns, W.B.(period from 01.02.2025 to 31.07.2025) | ORD/002178/2024-2025 | 21/BKP | 30/01/2025 | 181 | GOPAL SINGHA. | 0.86 | 1.37 | 0 | |||
| 491 | Barasat Division | Acceptance cum work order for Providing Functional Household Tap Connection (FHTC) in Bankra Dobar mouza including laying of UPVC/PVC pipe & supply of necessary fittings within Hingalganj w/s scheme (Zone-II), Hingalganj block under Hasnabad Sub-Division, PHE Dte. | ORD/002215/2020-2021 | 491/BD. | 26/02/2021 | 30 | J.D.J.ENTERPRISE. (TRADERS PVT.LTD) | 3.45 | 3.45 | 1 | |||
| 492 | Barasat Division | - Hiring of Luxury Car (Diesel) for the office use of the Assistant Engineer Bongaon Sub-Division, P.H.E. Dte. Under Bongaon Sub-Division P.H.E. Dte. (Period from 01.02.2021 to 31.01.2022.) | ORD/002217/2020-2021 | 77/Bon | 29/01/2021 | 365 | ROY ENGINEERS. | 1.73 | 0.00 | 1 | |||
| 493 | Barasat Division | Providing Functional Household Tap Connection (FHTC) in connection with Jal Jeevan Mission (JJM and Jal Swapna) under command area of Malidah Water Supply Scheme at Bagdah Block under Barasat Division, PHE Dte. (Phase-I). | ORD/002294/2020-2021 | 79/BD. | 18/01/2021 | 60 | ORIENT CONSTRUCTION. | 57.85 | 0.00 | 0 | |||
| 494 | Barasat Division | providing of Functional House hold Tap connection (FHTC) in connection with JJM under command area of Malidah Water Supply Scheme. | ORD/002299/2020-2021 | 276/BD. | 05/02/2021 | 7 | ORIENT CONSTRUCTION. | 11.00 | 11.00 | 1 | |||
| 495 | Barasat Division | Acceptance cum work order for Construction of protection wall for protection of UPVC pipe line at N/H of Majed Gazi at Uttar Kumarjole Purba para for Retrofitting of Kumarjole W/S Scheme, Minakhan Block under Hasnabad Sub-Division P.H.E. Dte. | ORD/002303/2020-2021 | 2055/BD | 18/09/2020 | 10 | RUDRA DAS. | 3.27 | 3.27 | 0 | |||
| 496 | Barasat Division | Route Survey,design drawing & DPR Preparation for PARUI Water Supply Scheme in Swarupnagar Block under Barasat Division, PHE Dte. | ORD/002495/2021-2022 | 460 / BHTSD | 22/03/2022 | 15 | SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. | 4.84 | 0.00 | 1 | |||
| 497 | Barasat Division | Route Survey, Design Drawing & DPR Preparation for NABATKATI Water Supply Scheme in Swarupnagar Block under Barasat Division, PHE Dte. | ORD/002496/2021-2022 | 459 / BHTSD | 22/03/2022 | 15 | SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. | 3.81 | 0.00 | 1 | |||
| 498 | Barasat Division | Route Survey, Design Drawing & DPR Preparation for BANGLANI Water Supply Scheme in Swarupnagar Block under Barasat Division, PHE Dte. | ORD/002499/2021-2022 | 456 / BHTSD | 22/03/2022 | 15 | SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. | 4.95 | 0.00 | 1 | |||
| 499 | Barasat Division | Additional Survey work for DPR Preparation for NALABARA Water Supply Scheme in Swarupnagar Block under Barasat Division, PHE Dte. | ORD/002501/2021-2022 | 455 / BHTSD | 22/03/2022 | 15 | SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. | 3.61 | 0.00 | 1 | |||
| 500 | Barasat Division | Route Survey, Design Drawing & DPR Preparation for NALABARA Water Supply Scheme in Swarupnagar Block under Barasat Division, PHE Dte. | ORD/002502/2021-2022 | 454 / BHTSD | 22/03/2022 | 15 | SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. | 4.97 | 0.00 | 1 | |||
| 501 | Barasat Division | Additional Survey work for DPR Preparation for BITHARI ZONE -2 Water Supply Scheme in Swarupnagar Block under Barasat Division, PHE Dte. | ORD/002505/2021-2022 | 453 / BHTSD | 22/03/2022 | 15 | SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. | 0.63 | 0.00 | 1 | |||
| 502 | Barasat Division | Route Survey, Design Drawing & DPR Preparation for BITHARI ZONE -2 Water Supply Scheme in Swarupnagar Block under Barasat Division, PHE Dte. | ORD/002506/2021-2022 | 452 / BHTSD | 22/03/2022 | 15 | SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. | 4.75 | 0.00 | 1 | |||
| 503 | Barasat Division | Route Survey, Design Drawing & DPR Preparation for BITHARI ZONE -1 Water Supply Scheme in Swarupnagar Block under Barasat Division, PHE Dte. | ORD/002508/2021-2022 | 450 / BHTSD | 22/03/2022 | 15 | SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. | 4.95 | 0.00 | 1 | |||
| 504 | Barasat Division | Route Survey, Design Drawing & DPR Preparation for DOBILA Water Supply Scheme in Swarupnagar Block under Barasat Division, PHE Dte. | ORD/002511/2021-2022 | 449 / BHTSD | 22/03/2022 | 15 | SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. | 3.50 | 0.00 | 1 | |||
| 505 | Barasat Division | Route Survey, Design Drawing & DPR Preparation for GOKULPUR Water Supply Scheme in Swarupnagar Block under Barasat Division, PHE Dte. | ORD/002512/2021-2022 | 448 / BHTSD | 22/03/2022 | 15 | SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. | 4.32 | 0.00 | 1 | |||
| 506 | Barasat Division | Route Survey, Design Drawing & DPR Preparation for TARANIPUR ZONE -1 Water Supply Scheme in Swarupnagar Block under Barasat Division, PHE Dte. | ORD/002514/2021-2022 | 446 / BHTSD | 22/03/2022 | 15 | SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. | 3.69 | 0.00 | 1 | |||
| 507 | Barasat Division | Route Survey, Design Drawing & DPR Preparation for KAPILESWARPUR Water Supply Scheme in Swarupnagar Block under Barasat Division, PHE Dte. | ORD/002515/2021-2022 | 445 / BHTSD | 22/03/2022 | 15 | SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. | 4.04 | 0.00 | 1 | |||
| 508 | Barasat Division | Route Survey, Design Drawing & DPR Preparation for PATUA Water Supply Scheme in Swarupnagar Block under Barasat Division, PHE Dte. | ORD/002516/2021-2022 | 444 / BHTSD | 22/03/2022 | 15 | SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. | 4.16 | 0.00 | 1 | |||
| 509 | Barasat Division | Route Survey, Design Drawing & DPR Preparation for DAKSHIN CHATRA ZONE -2 Water Supply Scheme in Swarupnagar Block under Barasat Division, PHE Dte. | ORD/002518/2021-2022 | 442 / BHTSD | 22/03/2022 | 15 | SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. | 4.04 | 0.00 | 1 | |||
| 510 | Barasat Division | Route Survey, Design Drawing & DPR Preparation for BARA BANKRA Water Supply Scheme in Swarupnagar Block under Barasat Division, PHE Dte. | ORD/002519/2021-2022 | 441 / BHTSD | 22/03/2022 | 15 | SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. | 4.57 | 0.00 | 1 | |||
| 511 | Barasat Division | Route Survey, Design Drawing & DPR Preparation for NITYANANDAKATI BALTI Water Supply Scheme in Swarupnagar Block under Barasat Division, PHE Dte. | ORD/002520/2021-2022 | 440 / BHTSD | 22/03/2022 | 15 | SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. | 3.69 | 0.00 | 1 | |||
| 512 | Barasat Division | Acceptance cum work order for Emergent restoration of existing pilling works to sustain the protection of UPVC distribution pipe line at different places within Bermajur w/s scheme, Sandeshkhali-I block under Hasnabad Sub- Division P.H.E. Dte. | ORD/002571/2021-2022 | 417/HSD | 04/03/2022 | 10 | UNIFIED ENGINEERS' CO-OPERATIVE SOCIETYLTD. | 3.87 | 0.00 | 1 | |||
| 513 | Barasat Division | Acceptance cum work order for Emergent restoration of existing pilling works to sustain the protection of UPVC distribution pipe line at different places within Hingalganj w/s scheme (Zone-II), Hingalganj block under Hasnabad Sub- Division P.H.E. Dte. | ORD/002572/2021-2022 | 406/HSD | 04/03/2022 | 10 | S.K.ENTERPRISE. | 3.98 | 3.97 | 1 | |||
| 514 | Barasat Division | Acceptance cum work order for Emergent restoration of existing pilling works to sustain the protection of UPVC distribution pipe line at different places within Bermajur w/s scheme, Sandeshkhali-I block under Hasnabad Sub- Division P.H.E. Dte. | ORD/002573/2021-2022 | 417/HSD | 04/03/2022 | 10 | UNIFIED ENGINEERS' CO-OPERATIVE SOCIETYLTD. | 3.87 | 3.89 | 1 | |||
| 515 | Barasat Division | Continuation work order for the work of Hiring Diesel Luxury Car on daily basis (for 6months from 01-04-2022 to 30-09-2022) for the Office of the Executive Engineer, Barasat Division, PHE Dte. | ORD/002600/2021-2022 | 962/BD | 29/03/2022 | 6 | MADHAB CHANDRA DAS | 0.90 | 1.32 | 1 | |||
| 516 | Barasat Division | Continuation work order for the work of Hiring Diesel Luxury Car on daily basis ( from 01-01-2022 to 30-06-2022) for the Office use of the Dy. Superintending Engineer-I, Monitoring Cell, PHE Dte | ORD/002639/2021-2022 | 2688/ BD | 31/12/2021 | 181 | DIPANKAR NASKAR. | 0.86 | 0.00 | 1 | |||
| 517 | Barasat Division | Construction of boundary wall within brick structure & approach road at O.H.R. site within Sultanpur Water Supply Scheme. | ORD/002645/2021-2022 | 548/BD. | 23/02/2022 | 30 | MONDAL & CO. (BASIRHAT). | 14.69 | 14.69 | 1 | |||
| 518 | Barasat Division | Continuation Order for Hiring Diesel Luxury Car on daily basis (for 4 months from 01.03.2022 to 30.06.2022) for the office use of the Assistant Engineer, Basirhat Sub-Division P.H.E. Dte. | ORD/002654/2021-2022 | 178/BHTSD | 25/02/2022 | 120 | DEB KUMAR DAS. | 0.58 | 1.83 | 1 | |||
| 519 | Barasat Division | Sinking of 300 Mtr.Deep 100X40 mm dia Trial- cum-production Tube-Well fitting with PVC Pipes and strainer with Indian Mark-II at Joypur Gopmahal of Basirhat-II Block under Barasat Division PHE Dte. | ORD/002657/2021-2022 | 1111/ BHT SD | 27/08/2021 | 20 | M/S MAA TARA ENTERPRISE | 2.34 | 1.95 | 1 | |||
| 520 | Barasat Division | Acceptance cum Work Order for Sinking of 1 no. 300 mm. x 200 mm. dia. 214 mtr deep tube well by D.R. Rig method having 250 mm. dia. 36 mtr. long housing pipe & 150 mm. dia. 30 mtr. long Filter at Ward No.- 6 under Ashokenagar-Kalyangar Municipality within the jurisdiction of Habra Sub-Division under Barasat Division, P.H.E. Dte. | ORD/002671/2021-2022 | 2452/BD | 17/12/2021 | 30 | NADIA TUBEWELLS | 2.89 | 2.89 | 1 | |||
| 521 | Barasat Division | Hiring of Luxury Car (Diesel) for the office use of the Assistant Engineer Bongaon Sub-Division, P.H.E. Dte. Under Bongaon Sub-Division P.H.E. Dte. (Period from 01.02.2022 to 31.01.2023.) | ORD/002673/2021-2022 | 45/Bon | 31/01/2022 | 12 | ROY ENGINEERS. | 1.73 | 1.16 | 1 | |||
| 522 | Barasat Division | Route Survey, Design Drawing & DPR Preparation for RAJNAGAR Water Supply Scheme in Basirhat-II Block under Barasat Division, PHE Dte. | ORD/002679/2021-2022 | 208/BHTSD | 28/02/2022 | 15 | SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. | 2.72 | 0.00 | 1 | |||
| 523 | Barasat Division | Route Survey, Design Drawing & Preparation of DPR for Bansghata Water Supply Scheme in Bagdah Block within the Jurisdiction of Bongaon Sub-Division under Barasat Division, PHE Dte. | ORD/002680/2021-2022 | 142/Bon | 18/02/2022 | 15 | SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. | 4.84 | 0.00 | 1 | |||
| 524 | Barasat Division | Route Survey, Design Drawing & DPR Preparation for BARA BANKRA Water Supply Scheme in Swarupnagar Block under Barasat Division, PHE Dte. | ORD/002681/2021-2022 | 441 /BHTSD | 22/03/2022 | 15 | SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. | 4.57 | 4.57 | 1 | |||
| 525 | Barasat Division | Acceptance cum work order for Emergent restoration of road for damage portion due to newly laid different dia DI/UPVC distribution pipe line at different places within Boyermari mouza in connection with retrofitting of Chunchura w/s scheme, Sandeshkhali-I block under Hasnabad Sub-Division P.H.E. Dte. | ORD/002795/2021-2022 | 355/HSD | 23/02/2022 | 15 | ABDUL ALIM MONDAL. | 4.78 | 4.78 | 1 | |||
| 526 | Barasat Division | Acceptance cum work order for Emergent restoration of road for damage portion due to newly laid different dia DI/UPVC distribution pipe line at different places in connection with retrofitting of Chunchura mouza in connection with retrofitting of Chunchura w/s scheme, Sandeshkhali-I block under Hasnabad Sub-Division P.H.E. Dte. | ORD/002796/2021-2022 | 356/hsd | 23/02/2022 | 15 | M/S RAJPATH CONSTRUCTION. | 4.80 | 4.80 | 1 | |||
| 527 | Barasat Division | Acceptance cum work order for Additional emergent restoration of road for damage portion due to newly laid different dia DI/UPVC distribution pipe line at different places in connection with retrofitting of Chunchura, Boyermari, Sankardaha Abad, Khas Sankardaha mouza in connection with retrofitting of Chunchura w/s scheme, Sandeshkhali-I block under Hasnabad Sub-Division P.H.E. Dte. | ORD/002797/2021-2022 | 357/HSD | 23/02/2022 | 15 | M/S RAJPATH CONSTRUCTION. | 4.80 | 4.77 | 1 | |||
| 528 | Barasat Division | Acceptance cum work order for Emergent casing of UPVC pipe line at different locations over Khal, channel, culverts, roads within Laukhali W/S Scheme, Sandeshkhali-I block under Hasnasbad Sub-Division, P.H.E.Dte. | ORD/002798/2021-2022 | 358/HSD | 23/02/2022 | 15 | SRI KRISHNA CO-OP-LABOUR CONTRACT AND CONST SOC LTD. | 4.39 | 4.49 | 1 | |||
| 529 | Barasat Division | Acceptance cum work order for Additional emergent resting of 100/150 mm dia DI pipeline by concrete block at different places within Laukhali w/s scheme, Sandeshkhali-I block under Hasnabad Sub-Division P.H.E. Dte. | ORD/002799/2021-2022 | 359/HSD | 23/02/2022 | 15 | MD.SALIM GAZI. | 4.19 | 4.15 | 1 | |||
| 530 | Barasat Division | Acceptance cum work order for Additional emergent resting of 200/250/300 mm dia DI pipeline by concrete block at different places within Laukhali w/s scheme, Sandeshkhali-I block under Hasnabad Sub-Division P.H.E. Dte. | ORD/002800/2021-2022 | 360/HSD | 23/02/2022 | 15 | SARKAR ENTERPRISE | 4.31 | 4.26 | 1 | |||
| 531 | Barasat Division | Acceptance cum work order for Emergent restoration of road for damage portion due to newly laid different dia DI/UPVC pipe line at different places at Agarhati Mouza within Laukhali w/s scheme, Sandeshkhali-I block under Hasnabad Sub-Division P.H.E. Dte. | ORD/002801/2021-2022 | 361/HSD | 23/02/2022 | 15 | MD.SALIM GAZI. | 4.76 | 4.76 | 1 | |||
| 532 | Barasat Division | Acceptance cum work order for Additional emergent restoration of road for damage portion due to newly laid different dia DI/UPVC pipe line at different places at Agarhati Mouza within Laukhali w/s scheme, Sandeshkhali-I block under Hasnabad Sub-Division P.H.E. Dte. | ORD/002802/2021-2022 | 362/HSD | 23/02/2022 | 15 | SRI KRISHNA CO-OP-LABOUR CONTRACT AND CONST SOC LTD. | 4.76 | 4.76 | 1 | |||
| 533 | Barasat Division | Acceptance cum work order for Additional emergent restoration of road for damage portion due to newly laid different dia DI/UPVC pipe line at different places at Patharghata Laukhali Mouza within Laukhali w/s scheme, Sandeshkhali-I block under Hasnabad Sub-Division P.H.E. Dte. | ORD/002803/2021-2022 | 363/HSD | 23/02/2022 | 15 | SRI KRISHNA CO-OP-LABOUR CONTRACT AND CONST SOC LTD. | 4.76 | 4.76 | 1 | |||
| 534 | Barasat Division | Acceptance cum work order for Protection work for newly laid Distribution main 300 mm dia DI Pipe with UC bullah pile from HW site to PWD Road within Rampur w/s scheme,Sandeskhali-II block under Hasnabad Sub-Division P.H.E. Dte. | ORD/002826/2021-2022 | 510/HSD | 15/03/2022 | 15 | NEW MANGES INDUSTRIAL CORPORATION | 2.25 | 2.01 | 1 | |||
| 535 | Barasat Division | Acceptance cum work order for Emergent resting of distribution main by concrete block for low areas from Pole para to Rampur bazaar in connection with retrofitting of Rampur w/s scheme , Sandeshkhali-II block under Hasnabad Sub-Division P.H.E. Dte. | ORD/002827/2021-2022 | 511/HSD | 15/03/2022 | 15 | S.S.ENTERPRISE. (BAMANGACHI) | 4.09 | 4.03 | 1 | |||
| 536 | Barasat Division | Acceptance cum work order for Emergent resting of 100/150 mm dia DI distribution main by concrete block for low areas of Rampur w/s scheme in connection with retrofitting, Sandeshkhali-II block under Hasnabad Sub-Division P.H.E. Dte. | ORD/002828/2021-2022 | 512/HSD | 15/03/2022 | 15 | S.S.ENTERPRISE. (BAMANGACHI) | 3.05 | 2.94 | 1 | |||
| 537 | Barasat Division | Acceptance cum work order Emergent restoration of road for damage portion due to newly laid different dia DI/UPVC pipe line at different places at Jeliakhali Purba mouza within Jeliakhali Purbakhanda w/s scheme, Sandeshkhali-II block under Hasnabad Sub-Division P.H.E. Dte. | ORD/002835/2021-2022 | 533/HSD | 15/03/2022 | 15 | PRITAM MUKHOPADHYAY. | 4.77 | 4.71 | 1 | |||
| 538 | Barasat Division | Acceptance cum work order for Emergent restoration of road for damage portion due to newly laid different dia DI/UPVC pipe line at different places at Bhanga Tushkhali mouza within Bhanga Tushkhali w/s scheme, Sandeshkhali-II block under Hasnabad Sub-Division P.H.E. Dte. | ORD/002837/2021-2022 | 536/HSD | 16/03/2022 | 15 | MD.SALIM GAZI. | 4.75 | 4.68 | 1 | |||
| 539 | Barasat Division | Acceptance cum work order for Emergent resting of 250/200 mm dia DI pipeline by concrete block over existing concrete wall beside Basanti Highway at different places for Chunchura w/s scheme, Sandeshkhali-I block under Hasnabad Sub-Division P.H.E. Dte. | ORD/002847/2021-2022 | 563/HSD | 22/03/2022 | 15 | MONDAL & CO. (BASIRHAT). | 4.41 | 4.30 | 1 | |||
| 540 | Barasat Division | Acceptance cum work order for Additional emergent resting of 150/100 mm dia DI pipeline by concrete block over existing concrete wall beside Basanti Highway at different places for Chunchura w/s scheme, Sandeshkhali-I block under Hasnabad Sub-Division P.H.E. Dte. | ORD/002848/2021-2022 | 564/HSD | 22/03/2022 | 15 | ANKUSH CONSTRUCTION & CO. | 4.41 | 4.41 | 1 | |||
| 541 | Barasat Division | Acceptance cum work order for Emergent casing of UPVC pipe line at different locations over Khal, channel, culverts, roads within Chunchura W/S Scheme, Sandeshkhali-I block under Hasnasbad Sub-Division, P.H.E.Dte. | ORD/002849/2021-2022 | 565/HSD | 22/03/2022 | 15 | MONDAL & CO. (BASIRHAT). | 4.38 | 4.37 | 1 | |||
| 542 | Barasat Division | Acceptance cum work order for Emergent resting of 100/150/200 mm dia DI pipeline by concrete block at different places from Kalupara more to N/H/O Sukumar Mahato within Chunchura w/s scheme, Sandeshkhali-I block under Hasnabad Sub-Division P.H.E. Dte. | ORD/002850/2021-2022 | 566/HSD | 22/03/2022 | 15 | ANKUSH CONSTRUCTION & CO. | 4.32 | 4.03 | 1 | |||
| 543 | Barasat Division | Acceptance cum work order for Emergent resting of 100/150/200 mm dia DI pipeline by concrete block at different places from N/H/O Sukumar Mahato to Dheknimari High School within Chunchura w/s scheme, Sandeshkhali-I block under Hasnabad Sub-Division P.H.E. Dte. | ORD/002851/2021-2022 | 567/HSD | 22/03/2022 | 15 | MONDAL & CO. (BASIRHAT). | 4.32 | 4.29 | 1 | |||
| 544 | Barasat Division | Acceptance cum work order for Emergent resting of distribution main by concrete block for low areas at Halder Ghery to Pole para in connection with retrofitting of Rampur w/s scheme , Sandeshkhali-II block under Hasnabad Sub-Division P.H.E. Dte. | ORD/002852/2021-2022 | 568/HSD | 22/03/2022 | 15 | S.S.ENTERPRISE. (BAMANGACHI) | 3.97 | 3.92 | 1 | |||
| 545 | Barasat Division | Acceptance cum work order for Additional Emergent resting of distribution main by concrete block for low areas at Halder Ghery to Pole para in connection with retrofitting of Rampur w/s scheme , Sandeshkhali-II block under Hasnabad Sub-Division P.H.E. Dte. | ORD/002853/2021-2022 | 569/HSD | 22/03/2022 | 15 | NEW MANGES INDUSTRIAL CORPORATION | 4.24 | 4.19 | 1 | |||
| 546 | Barasat Division | Acceptance cum work order for Emergent resting of distribution main by concrete block for low areas at PWD road to Rampur Burning ghat in connection with retrofitting of Rampur w/s scheme , Sandeshkhali-II block under Hasnabad Sub-Division P.H.E. Dte. | ORD/002854/2021-2022 | 570/HSD | 22/03/2022 | 15 | S.S.ENTERPRISE. (BAMANGACHI) | 4.02 | 2.38 | 1 | |||
| 547 | Barasat Division | Acceptance cum work order for Emergent resting of 200mm dia DI distribution main by concrete block for low areas in connection with retrofitting of Rampur w/s scheme , Sandeshkhali-II block under Hasnabad Sub-Division P.H.E. Dte. | ORD/002855/2021-2022 | 571/HSD | 22/03/2022 | 15 | S.S.ENTERPRISE. (BAMANGACHI) | 4.50 | 3.63 | 0 | |||
| 548 | Barasat Division | Acceptance cum work order for Emergent resting of 250mm dia DI distribution main by concrete block for low areas in connection with retrofitting of Rampur w/s scheme , Sandeshkhali-II block under Hasnabad Sub-Division P.H.E. Dte. | ORD/002856/2021-2022 | 572/HSD | 22/03/2022 | 15 | NEW MANGES INDUSTRIAL CORPORATION | 4.12 | 3.28 | 0 | |||
| 549 | Barasat Division | Acceptance cum work order for Emergent resting of different dia UPVC/DI pipeline by UC bullah pile at different places in different mouza while laying of pipeline in connection with retrofitting of Chunchura w/s scheme, Sandeshkhali-I block under Hasnabad Sub- Division P.H.E. Dte. | ORD/002857/2021-2022 | 573/HSD | 23/03/2022 | 15 | S. GHOSH & ASSOCIATES PVT. LTD. | 2.83 | 2.82 | 1 | |||
| 550 | Barasat Division | Acceptance cum work order for Supply of Mechanized boat on hire basis with providing driver, helper and other requirement as per terms condition and specification as per direction of the EIC under Hasnabad Sub-Division, P.H.E. Dte. Period : 01.07.2021 to 30.06.2022 = 365 days | ORD/002867/2021-2022 | 1112/HSD | 29/06/2021 | 365 | RANJIT KUMAR MANDAL. | 3.15 | 1.05 | 1 | |||
| 551 | Barasat Division | Acceptance cum work order for Emergent restoration of road for damage portion due to newly laid 125 mm dia HDPE distribution pipe line from Arsad Miya Bazar to Dhamakhali Busstand in connection with retrofitting of Rampur w/s scheme, Sandeshkhali-II block under Hasnabad Sub-Division P.H.E. Dte. | ORD/002870/2021-2022 | 578/HSD | 28/03/2022 | 15 | S.S.ENTERPRISE. (BAMANGACHI) | 4.73 | 3.59 | 1 | |||
| 552 | Barasat Division | Acceptance cum work order for Emergent restoration of pipeline by laying of 90 mm dia. UPVC pipe line at different places of Patkelpota Mouza within Sultanpur W/S Scheme, Minakhan block under Hasnasbad Sub-Division, P.H.E.Dte. | ORD/002871/2021-2022 | 579/HSD | 28/03/2022 | 15 | ANKUSH CONSTRUCTION & CO. | 4.55 | 4.13 | 1 | |||
| 553 | Barasat Division | Acceptance cum work order for Emergent restoration of different dia. DI distribution pipe line from near Bankra Bazar to near culvert for damaged portion due to widening & strengthing of PWD road within Hingalganj w/s scheme (Zone-I), Hingalganj Block under Hasnabad Sub-Division P.H.E. Dte. | ORD/002873/2021-2022 | 581/HSD | 28/03/2022 | 15 | MONDAL & CO. (BASIRHAT). | 3.74 | 3.67 | 1 | |||
| 554 | Barasat Division | Acceptance cum work order for Emergent restoration of road for damage portion due to newly laid different dia UPVC distribution pipe line at different places of Haldar para,Haldar gheri more & pole para in connection with retrofitting of Rampur w/s scheme, Sandeshkhali-II block under Hasnabad Sub-Division P.H.E. Dte. | ORD/002874/2021-2022 | 582/HSD | 28/03/2022 | 15 | S.S.ENTERPRISE. (BAMANGACHI) | 4.17 | 4.11 | 1 | |||
| 555 | Barasat Division | Acceptance cum work order for Emergent restoration of 160 mm dia. HDPE pipe line from PH No- 4 to near Kathabari more due to widening & strengthening of PWD road in connection with retrofitting of Hingalganj w/s scheme (Z-II), Hingalganj Block under Hasnabad Sub- Division P.H.E. Dte. | ORD/002875/2021-2022 | 583/HSD | 28/03/2022 | 15 | SARKAR ENTERPRISE | 4.94 | 4.94 | 1 | |||
| 556 | Barasat Division | Acceptance cum work order for Emergent resting of 100/150 mm dia DI pipeline by concrete block at different places within Hingalganj w/s scheme (Zone-I), Hingalganj block under Hasnabad Sub-Division P.H.E. Dte. | ORD/002876/2021-2022 | 584/HSD | 28/03/2022 | 15 | TRISHA ENTERPRISE & CO. | 3.09 | 3.06 | 1 | |||
| 557 | Barasat Division | Acceptance cum work order for Emergent restoration of road for damage portion due to newly laid different dia UPVC distribution pipe line at different places of Molla para,Colony para,Samanta Para & Bagdi para connection with retrofitting of Rampur w/s scheme, Sandeshkhali-II block under Hasnabad Sub-Division P.H.E. Dte. | ORD/002877/2021-2022 | 586/HSD | 28/03/2022 | 15 | S.S.ENTERPRISE. (BAMANGACHI) | 4.06 | 3.97 | 1 | |||
| 558 | Barasat Division | Acceptance cum work order for Emergent restoration of pipeline by laying of 90 mm dia. UPVC pipe line at different places of Turia Mouza within Sultanpur W/S Scheme, Minakhan block under Hasnasbad Sub-Division, P.H.E.Dte. | ORD/002878/2021-2022 | 587/HSD | 28/03/2022 | 15 | MONDAL & CO. (BASIRHAT). | 4.57 | 4.12 | 1 | |||
| 559 | Barasat Division | Acceptance cum work order for Emergent restoration of DI rising main from near culvert to near Sahapur more for damaged portion due to widening & strengthing of PWD road within Hingalganj w/s scheme (Zone-I), Hingalganj Block under Hasnabad Sub-Division P.H.E. Dte. | ORD/002879/2021-2022 | 588/HSD | 28/03/2022 | 15 | TRISHA ENTERPRISE & CO. | 4.85 | 4.80 | 1 | |||
| 560 | Barasat Division | Acceptance cum work order for Emergent restoration of pipeline by laying of 90 mm dia. UPVC pipe line at different places of Joykrishnapur Mouza within Sultanpur W/S Scheme, Minakhan block under Hasnasbad Sub-Division, P.H.E.Dte. | ORD/002880/2021-2022 | 589/HSD | 28/03/2022 | 15 | ANKUSH CONSTRUCTION & CO. | 4.53 | 4.04 | 1 | |||
| 561 | Barasat Division | Acceptance cum work order for Emergent restoration of road for damage portion due to newly laid different dia UPVC distribution pipe line at different places of Akunji para,Naskar para,Gajen para & 50 Bigha more in connection with retrofitting of Rampur w/s scheme, Sandeshkhali-II block under Hasnabad Sub-Division P.H.E. Dte. | ORD/002881/2021-2022 | 590/HSD | 29/03/2022 | 15 | S.S.ENTERPRISE. (BAMANGACHI) | 4.75 | 4.60 | 1 | |||
| 562 | Barasat Division | Acceptance cum work order for Emergent restoration of pipeline by laying of different dia. UPVC pipe line at different places of Patkelpota abad mouza within Sultanpur W/S Scheme, Minakhan block under Hasnasbad Sub-Division, P.H.E.Dte. | ORD/002882/2021-2022 | 591/HSD | 29/03/2022 | 15 | TRISHA ENTERPRISE & CO. | 4.51 | 4.24 | 1 | |||
| 563 | Barasat Division | Acceptance cum work order for Emergent withdrawing & relaying of different dia. UPVC pipe line at Hingalganj Bazar area, Hingalganj Hospital, BDO Office, Dk. Hingalganj, Garhpara, Sahapur & other places for damaged portion within Hingalganj W/S Scheme (Z-I), Hingalganj block under Hasnasbad Sub-Division, P.H.E.Dte. | ORD/002883/2021-2022 | 592/HSD | 29/03/2022 | 15 | SARKAR ENTERPRISE | 4.87 | 4.87 | 1 | |||
| 564 | Barasat Division | Acceptance cum work order for Emergent restoration of pipeline by withdrawing & relaying of 90mm dia. UPVC pipe line at different places of Joykrishnapur mouza within Sultanpur W/S Scheme, Minakhan block under Hasnasbad Sub-Division, P.H.E.Dte. | ORD/002884/2021-2022 | 593/HSD | 29/03/2022 | 15 | ANKUSH CONSTRUCTION & CO. | 4.86 | 4.53 | 1 | |||
| 565 | Barasat Division | Acceptance cum work order for Emergent restoration of different dia. UPVC pipe line at different places in Bankra & Bankra Dobar Mouza due to widening & strengthing of PWD road for damage portion within Hingalganj W/S Scheme (Z-II), Hingalganj block under Hasnasbad Sub-Division, P.H.E.Dte. | ORD/002885/2021-2022 | 594/HSD | 29/03/2022 | 15 | M/S NIRMAN CONSTRUCTION. | 4.49 | 4.49 | 1 | |||
| 566 | Barasat Division | Acceptance cum work order for Emergent restoration of pipeline by withdrawing & relaying of different dia. UPVC pipe line at different places of Turia mouza within Sultanpur W/S Scheme, Minakhan block under Hasnasbad Sub-Division, P.H.E.Dte. | ORD/002886/2021-2022 | 595/HSD | 31/03/2022 | 15 | MONDAL & CO. (BASIRHAT). | 4.81 | 4.15 | 1 | |||
| 567 | Barasat Division | Acceptance cum work order for Emergent restoration of UPVC pipe line from Hingalganj Kalibari to Hingalganj GP office for damaged portion due to widening & strengthening of PWD road within Hingalganj w/s scheme (Zone-I), Hingalganj Block under Hasnabad Sub-Division, PHE Dte. | ORD/002887/2021-2022 | 596/HSD | 31/03/2022 | 15 | TRISHA ENTERPRISE & CO. | 4.18 | 4.18 | 1 | |||
| 568 | Barasat Division | Acceptance cum work order for Emergent restoration of road for damage portion due to newly laid different dia UPVC distribution pipe line at different places of Bagdipara to rampur bazar road,rampur ferry ghat to anganwadi centre & 972 bus stand in connection with retrofitting of Rampur w/s scheme, Sandeshkhali-II block under Hasnabad Sub-Division P.H.E. Dte. | ORD/002889/2021-2022 | 598/HSD | 31/03/2022 | 15 | NEW MANGES INDUSTRIAL CORPORATION | 1.39 | 1.31 | 1 | |||
| 569 | Barasat Division | Acceptance cum work order for Emergent restoration of pipeline by laying of 90 mm dia. UPVC pipe line at different places of Patkelpota abad mouza within Sultanpur W/S Scheme, Minakhan block under Hasnasbad Sub-Division, P.H.E.Dte. | ORD/002890/2021-2022 | 599/HSD | 31/03/2022 | 15 | ANKUSH CONSTRUCTION & CO. | 4.56 | 4.45 | 1 | |||
| 570 | Barasat Division | Acceptance cum work order for Emergent restoration of UPVC pipe line from near Hingalganj GP office to Dakshin Hingalganj at different places (SI office, Garpara, BDO office, Sahapur) for damaged portion within Hingalganj w/s scheme (Zone-I), Hingalganj Block under Hasnabad Sub-Division, PHE Dte. | ORD/002891/2021-2022 | 600/HSD | 31/03/2022 | 15 | MONDAL & CO. (BASIRHAT). | 4.42 | 4.42 | 1 | |||
| 571 | Barasat Division | Acceptance cum work order for Emergent restoration of pipeline by laying of different dia. UPVC pipe line at different places of Patkelpota mouza within Sultanpur W/S Scheme, Minakhan block under Hasnasbad Sub-Division, P.H.E.Dte. | ORD/002892/2021-2022 | 601/HSD | 31/03/2022 | 15 | TRISHA ENTERPRISE & CO. | 4.53 | 4.29 | 1 | |||
| 572 | Barasat Division | Acceptance cum work order for Emergent restoration of different dia. UPVC pipe line from near Hingalganj Kalibari to near Sahapur more for damaged portion due to widening & Strengthing of PWD road within Hingalganj w/s scheme (Zone-I), Hingalganj Block under Hasnabad Sub-Division, PHE Dte. | ORD/002893/2021-2022 | 602/HSD | 31/03/2022 | 15 | MONDAL & CO. (BASIRHAT). | 4.26 | 4.26 | 1 | |||
| 573 | Barasat Division | Acceptance cum work order for Emergent restoration of pipeline by withdrawing & relaying of different dia. UPVC pipe line at different places of Turia mouza within Sultanpur W/S Scheme, Minakhan block under Hasnasbad Sub-Division, P.H.E.Dte. | ORD/002894/2021-2022 | 603/HSD | 31/03/2022 | 15 | ANKUSH CONSTRUCTION & CO. | 4.78 | 4.61 | 1 | |||
| 574 | Barasat Division | Repairing & Renovation of 02No. Pump House and allied works at Dhalani water supply scheme under Bongaon Sub-Division, P.H.E.Dte. | ORD/002905/2021-2022 | 595/BON | 22/12/2021 | 21 | TAPAN GHOSH. | 2.52 | 0.00 | 1 | |||
| 575 | Barasat Division | Repairing & Renovation 2(Two) nos of Pump House and allied works of Diara water supply scheme under Bongaon Sub-Division, P.H.E.Dte. | ORD/002910/2021-2022 | 516/Bon | 27/10/2021 | 21 | ROY ENGINEERS. | 2.52 | 2.47 | 0 | |||
| 576 | Barasat Division | Repairing & Renovation 2(Two) nos of Pump House and allied works of Gadpukuria water supply scheme under Bongaon Sub-Division, P.H.E.Dte. | ORD/002925/2021-2022 | 531/Bon | 03/11/2021 | 21 | MA CONSTRUCTION. | 2.52 | 2.49 | 1 | |||
| 577 | Barasat Division | Repairing & Renovation of 1 No. Pump House (Size- 5.20 x 7.20) of Head Work Site and allied works at Sohai Swetpur Water Supply Scheme Zone-II under Barasat Sub-Division, P.H.E.Dte. | ORD/002944/2021-2022 | 818/BSD | 10/12/2021 | 30 | BHABANI ENTERPRISE. | 1.84 | 1.75 | 0 | |||
| 578 | Barasat Division | Repairing & Renovation of 02 Nos. Pump House (P.H. No.-II & III) and allied works at Bodai Water Supply Scheme Zone-I under Barasat Sub-Division, P.H.E.Dte. | ORD/002948/2021-2022 | 809/BSD | 08/12/2021 | 30 | MONDAL ENTERPRISE. (BARASAT) | 2.52 | 2.33 | 0 | |||
| 579 | Barasat Division | Repairing & Renovation of 02 Nos. Pump House (P.H. No.-IV & V) and allied works at Bodai Water Supply Scheme Zone-I under Barasat Sub-Division, P.H.E.Dte. | ORD/002950/2021-2022 | 810/BSD | 09/12/2021 | 30 | SUN ENTERPRISE. | 2.52 | 2.32 | 0 | |||
| 580 | Barasat Division | Acceptance cum Work Order for Providing Functional Household Tap Connection (FHTC) in connection with Jal Jeevan Mission (JJM and Jal Swapna) under command area of Gadpukuria Water Supply Scheme at Bagdah Block under Barasat Division, PHE Dte. (Phase-I). | ORD/003014/2021-2022 | 1356/BD. | 03/08/2021 | 90 | ORIENT CONSTRUCTION. | 131.31 | 0.00 | 1 | |||
| 581 | Barasat Division | Hiring 1(One) No. Diesel Luxury Car on Daily basis. (for 12 months from 01.03.2022 to 28.02.2023 w.e.f. 01.12.2022) for the office use of the Assistant Engineer, Barasat Sub Division, P.H.E. Dte. | ORD/003025/2021-2022 | 193/BSD | 25/02/2022 | 365 | MADHAB CHANDRA DAS | 1.25 | 0.76 | 0 | |||
| 582 | Barasat Division | Formal Work order for Laying of DI rising main and DI/UPVC distribution pipe line and Construction of 900 cum capacity 20 mtr. staging height R.C.C. Over Head Water Reservoir as per Departmental design, drawing and specification including bored pile & pile cap at Chunchura & Rajbari water supply scheme, Sandeshkhali-I block under Hasnabad Sub-Division,PHE Dte. under Barasat Division, PHE Dte. | ORD/003031/2021-2022 | 767/Bd | 16/03/2022 | 12 | S. GHOSH & ASSOCIATES PVT. LTD. | 563.09 | 352.17 | 100 | |||
| 583 | Barasat Division | Acceptance cum work order for Restoration of different diameter existing pipe lines by laying UPVC pipes and allied works of Sadpur W/S scheme due to up gradation of different roads within the jurisdiction of Habra Sub-Division, under Barasat Division, P.H.E. Dte. | ORD/003033/2021-2022 | 2047//BD | 21/09/2021 | 30 | MONDAL ENTERPRISE. (BARASAT) | 26.59 | 11.14 | 100 | |||
| 584 | Barasat Division | Material Requisition To Resource Division | RTOR000001/2021-2022 | 2240/BD | 24/11/2021 | 0 | Resource Division | 10.26 | 0.00 | 0 | |||
| 585 | Barasat Division | Material Requisition To Resource Division | RTOR000002/2021-2022 | 2238/BD | 24/11/2021 | 0 | Resource Division | 10.26 | 0.00 | 0 | |||
| 586 | Barasat Division | Material Requisition To Resource Division | RTOR000003/2021-2022 | 2239/BD | 24/11/2021 | 0 | Resource Division | 10.26 | 0.00 | 0 | |||
| 587 | Barasat Division | Material Requisition To Resource Division | RTOR000005/2021-2022 | 2242/BD | 24/11/2021 | 0 | Resource Division | 10.26 | 0.00 | 0 | |||
| 588 | Barasat Division | Material Requisition To Resource Division | RTOR000012/2021-2022 | 249/BD | 27/01/2022 | 0 | Resource Division | 1.99 | 0.00 | 0 | |||
| 589 | Barasat Division | Material Requisition To Resource Division | RTOR000013/2021-2022 | 251/BD | 27/01/2022 | 0 | Resource Division | 1.99 | 0.00 | 0 | |||
| 590 | Barasat Division | Material Requisition To Resource Division | RTOR000014/2021-2022 | 252/BD | 27/01/2022 | 0 | Resource Division | 1.99 | 0.00 | 0 | |||
| 591 | Barasat Division | Material Requisition To Resource Division | RTOR000015/2021-2022 | 250/BD | 27/01/2022 | 0 | Resource Division | 1.99 | 0.00 | 0 | |||
| 592 | Barasat Division | Material Requisition To Resource Division | RTOR000015/2022-2023 | 1438/BD | 23/05/2022 | 0 | Resource Division | 9.71 | 0.00 | 0 | |||
| 593 | Barasat Division | Material Requisition To Resource Division | RTOR000026/2022-2023 | 1828/BD | 29/06/2022 | 0 | Resource Division | 195.63 | 0.00 | 0 | |||
| 594 | Barasat Division | Material Requisition To Resource Division | RTOR000030/2021-2022 | 941/BD | 28/03/2022 | 0 | Resource Division | 150.53 | 0.00 | 0 | |||
| 595 | Barasat Division | Material Requisition To Resource Division | RTOR000031/2021-2022 | 961/BD | 29/03/2022 | 0 | Resource Division | 115.45 | 0.00 | 0 | |||
| 596 | Barasat Division | Material Requisition To Resource Division | RTOR000049/2022-2023 | 2861/BD | 21/09/2022 | 0 | Resource Division | 0.00 | 0.00 | 0 | |||
| 597 | Barasat Division | Material Requisition To Resource Division | RTOR000050/2022-2023 | 2868/BD | 21/09/2022 | 0 | Resource Division | 2.14 | 0.00 | 0 | |||
| 598 | Barasat Division | Material Requisition To Resource Division | RTOR000051/2022-2023 | 2858/BD | 21/09/2022 | 0 | Resource Division | 1.85 | 0.00 | 0 | |||
| 599 | Barasat Division | Material Requisition To Resource Division | RTOR000052/2022-2023 | 2866/BD | 21/09/2022 | 0 | Resource Division | 2.83 | 0.00 | 0 | |||
| 600 | Barasat Division | Material Requisition To Resource Division | RTOR000053/2022-2023 | 2860/BD | 21/09/2022 | 0 | Resource Division | 3.08 | 0.00 | 0 | |||
| 601 | Barasat Division | Material Requisition To Resource Division | RTOR000054/2022-2023 | 2865/BD | 21/09/2022 | 0 | Resource Division | 1.23 | 0.00 | 0 | |||
| 602 | Barasat Division | Material Requisition To Resource Division | RTOR000055/2022-2023 | 2862/BD | 21/09/2022 | 0 | Resource Division | 36.20 | 0.00 | 0 | |||
| 603 | Barasat Division | Material Requisition To Resource Division | RTOR000056/2022-2023 | 2863/BD | 21/09/2022 | 0 | Resource Division | 3.08 | 0.00 | 0 | |||
| 604 | Barasat Division | Material Requisition To Resource Division | RTOR000057/2022-2023 | 2864/BD | 21/09/2022 | 0 | Resource Division | 2.16 | 0.00 | 0 | |||
| 605 | Barasat Division | Material Requisition To Resource Division | RTOR000058/2022-2023 | 2859/BD | 21/09/2022 | 0 | Resource Division | 27.73 | 0.00 | 0 | |||
| 606 | Barasat Division | Material Requisition To Resource Division | RTOR000059/2022-2023 | 2866/BD | 21/09/2022 | 0 | Resource Division | 0.10 | 0.00 | 0 | |||
| 607 | Barasat Division | Material Requisition To Resource Division | RTOR000063/2022-2023 | 2338/BD | 26/09/2022 | 0 | Resource Division | 61.50 | 0.00 | 0 | |||
| 608 | Barasat Division | Material Requisition To Resource Division | RTOR000064/2022-2023 | 2342/BD | 26/09/2022 | 0 | Resource Division | 24.12 | 0.00 | 0 | |||
| 609 | Barasat Division | Material Requisition To Resource Division | RTOR000065/2022-2023 | 2341/BD | 26/09/2022 | 0 | Resource Division | 2.93 | 0.00 | 0 | |||
| 610 | Barasat Division | Material Requisition To Resource Division | RTOR000066/2022-2023 | 2339/BD | 26/09/2022 | 0 | Resource Division | 61.51 | 0.00 | 0 | |||
| 611 | Barasat Division | Material Requisition To Resource Division | RTOR000067/2022-2023 | 2340/BD | 26/09/2022 | 0 | Resource Division | 18.30 | 0.00 | 0 | |||
| 612 | Barasat Division | Material Requisition To Resource Division | RTOR000068/2022-2023 | 2986/BD | 29/09/2022 | 0 | Resource Division | 0.06 | 0.00 | 0 | |||
| 613 | Barasat Division | Material Requisition To Resource Division | RTOR000069/2022-2023 | 2992/BD | 29/09/2022 | 0 | Resource Division | 0.02 | 0.00 | 0 | |||
| 614 | Barasat Division | Material Requisition To Resource Division | RTOR000070/2022-2023 | 2993/BD | 29/09/2022 | 0 | Resource Division | 0.08 | 0.00 | 0 | |||
| 615 | Barasat Division | Material Requisition To Resource Division | RTOR000071/2022-2023 | 2984/BD | 29/09/2022 | 0 | Resource Division | 0.02 | 0.00 | 0 | |||
| 616 | Barasat Division | Material Requisition To Resource Division | RTOR000072/2022-2023 | 2985/BD | 29/09/2022 | 0 | Resource Division | 7.39 | 0.00 | 0 | |||
| 617 | Barasat Division | Material Requisition To Resource Division | RTOR000073/2022-2023 | 2990/BD | 29/09/2022 | 0 | Resource Division | 0.02 | 0.00 | 0 | |||
| 618 | Barasat Division | Material Requisition To Resource Division | RTOR000074/2022-2023 | 2987/BD | 29/09/2022 | 0 | Resource Division | 0.01 | 0.00 | 0 | |||
| 619 | Barasat Division | Material Requisition To Resource Division | RTOR000075/2022-2023 | 2989/BD | 29/09/2022 | 0 | Resource Division | 7.39 | 0.00 | 0 | |||
| 620 | Barasat Division | Material Requisition To Resource Division | RTOR000076/2022-2023 | 2988/BD | 29/09/2022 | 0 | Resource Division | 0.01 | 0.00 | 0 | |||
| 621 | Barasat Division | Material Requisition To Resource Division | RTOR000077/2022-2023 | 2991/BD | 29/09/2022 | 0 | Resource Division | 0.20 | 0.00 | 0 | |||
| 622 | Barasat Division | Material Requisition To Resource Division | RTOR000079/2023-2024 | 1816/BD | 19/06/2023 | 0 | Resource Division | 40.04 | 0.00 | 0 | |||
| 623 | Barasat Division | Material Requisition To Resource Division | RTOR000080/2023-2024 | 1809/BD | 19/06/2023 | 0 | Resource Division | 14.78 | 0.00 | 0 | |||
| 624 | Barasat Division | Material Requisition To Resource Division | RTOR000081/2023-2024 | 1810/BD | 19/06/2023 | 0 | Resource Division | 13.49 | 0.00 | 0 | |||
| 625 | Barasat Division | Material Requisition To Resource Division | RTOR000082/2023-2024 | 1811/BD | 19/06/2023 | 0 | Resource Division | 3.15 | 0.00 | 0 | |||
| 626 | Barasat Division | Material Requisition To Resource Division | RTOR000083/2023-2024 | 1812/BD | 19/06/2023 | 0 | Resource Division | 16.51 | 0.00 | 0 | |||
| 627 | Barasat Division | Material Requisition To Resource Division | RTOR000084/2023-2024 | 1817/BD | 19/06/2023 | 0 | Resource Division | 52.67 | 0.00 | 0 | |||
| 628 | Barasat Division | Material Requisition To Resource Division | RTOR000085/2023-2024 | 1813/BD | 19/06/2023 | 0 | Resource Division | 2.59 | 0.00 | 0 | |||
| 629 | Barasat Division | Material Requisition To Resource Division | RTOR000086/2023-2024 | 1818/BD | 19/06/2023 | 0 | Resource Division | 16.39 | 0.00 | 0 | |||
| 630 | Barasat Division | Material Requisition To Resource Division | RTOR000087/2023-2024 | 1819/BD | 19/06/2023 | 0 | Resource Division | 21.78 | 0.00 | 0 | |||
| 631 | Barasat Division | Material Requisition To Resource Division | RTOR000088/2023-2024 | 1821/BD | 19/06/2023 | 0 | Resource Division | 16.88 | 0.00 | 0 | |||
| 632 | Barasat Division | Material Requisition To Resource Division | RTOR000089/2023-2024 | 1814/BD | 19/06/2023 | 0 | Resource Division | 30.80 | 0.00 | 0 | |||
| 633 | Barasat Division | Material Requisition To Resource Division | RTOR000090/2023-2024 | 1815/BD | 19/06/2023 | 0 | Resource Division | 18.48 | 0.00 | 0 | |||
| 634 | Barasat Division | Material Requisition To Resource Division | RTOR000091/2023-2024 | 1820/BD | 19/06/2023 | 0 | Resource Division | 20.33 | 0.00 | 0 | |||
| 635 | Barasat Division | Material Requisition To Resource Division | RTOR000100/2023-2024 | 1995/BD | 10/07/2023 | 0 | Resource Division | 126.15 | 0.00 | 0 | |||
| 636 | Barasat Division | Material Requisition To Resource Division | RTOR000101/2022-2023 | 3660/BD | 13/12/2022 | 0 | Resource Division | 3.12 | 0.00 | 0 | |||
| 637 | Barasat Division | Material Requisition To Resource Division | RTOR000102/2022-2023 | 3664/BD | 13/12/2022 | 0 | Resource Division | 2.09 | 0.00 | 0 | |||
| 638 | Barasat Division | Material Requisition To Resource Division | RTOR000103/2022-2023 | 3658/BD | 13/12/2022 | 0 | Resource Division | 15.09 | 0.00 | 0 | |||
| 639 | Barasat Division | Material Requisition To Resource Division | RTOR000104/2022-2023 | 3659/BD | 13/12/2022 | 0 | Resource Division | 15.10 | 0.00 | 0 | |||
| 640 | Barasat Division | Material Requisition To Resource Division | RTOR000117/2023-2024 | 4024/BD | 12/10/2023 | 0 | Resource Division | 123.26 | 0.00 | 0 | |||
| 641 | Barasat Division | Material Requisition To Resource Division | RTOR000118/2023-2024 | 4025/BD | 12/10/2023 | 0 | Resource Division | 78.14 | 0.00 | 0 | |||
| 642 | Barasat Division | Material Requisition To Resource Division | RTOR000150/2022-2023 | 44/BD | 04/01/2023 | 0 | Resource Division | 61.60 | 0.00 | 0 | |||
| 643 | Barasat Division | Material Requisition To Resource Division | RTOR000157/2022-2023 | 156/BD | 18/01/2023 | 0 | Resource Division | 35.12 | 0.00 | 0 | |||
| 644 | Barasat Division | Material Requisition To Resource Division | RTOR000177/2022-2023 | 598/BD | 23/02/2023 | 0 | Resource Division | 22.18 | 0.00 | 0 | |||
| 645 | Barasat Division | Material Requisition To Resource Division | RTOR000178/2022-2023 | 603/BD | 23/02/2023 | 0 | Resource Division | 38.14 | 0.00 | 0 | |||
| 646 | Barasat Division | Material Requisition To Resource Division | RTOR000193/2022-2023 | 678/BD | 01/03/2023 | 0 | Resource Division | 24.64 | 0.00 | 0 | |||
| 647 | Barasat Division | Material Requisition To Resource Division | RTOR000194/2022-2023 | 677/BD | 01/03/2023 | 0 | Resource Division | 61.60 | 0.00 | 0 | |||
| 648 | North 24 Pgs W/S Division I | Providing Functional Household Tap Connection (FHTC) in connection with Jal Jeevan Mission (JJM and JAL SWAPNA) under command area of PAIKPARA Water Supply Scheme at BONGAON Block under North 24 Parganas water supply Division - I, PHE Dte. (PHASE-II) | ORD/000003/2021-2022 | 419/NWSD-I | 31/05/2021 | 90 | ORIENT CONSTRUCTION | 96.79 | 79.46 | 100 | |||
| 649 | North 24 Pgs W/S Division I | Continuation order for the work of Hiring of 1 (one) no. Motor Cab / Maxi Cab with contract carriage permit of R.T.A. In good running condition both in regards to body and engine with efficient driver with valid driving license as deemed it on daily rental basis including fulfillment of all other condition for use of the Assistant Engineer, North 24 Parganas W/S Sub-Division-I, P.H.E. Dte. for 6(Six) months, i.e. 184 days. [w.e.f. 01.05.2024 to 31.10.2024] (Car No.WB25K0619) | ORD/000001/2024-2025 | 652/NWSD-I | 16/04/2024 | 184 | M/S. SHUBHA ENTERPRISE | 0.87 | 1.89 | 0 | |||
| 650 | North 24 Pgs W/S Division I | Providing Functional Household Tap Connection (FHTC) in connection with Jal Jeevan Mission (JJM and JAL SWAPNA) under command area of DIGHARI Water Supply Scheme at BONGAON Block under North 24 Parganas water supply Division - I, PHE Dte. (Phase-II) | ORD/000004/2021-2022 | 417/NWSD-I | 31/05/2021 | 60 | SUDHAMAY MAJUMDAR | 60.62 | 60.00 | 1 | |||
| 651 | North 24 Pgs W/S Division I | Providing Functional Household Tap Connection (FHTC) in connection with Jal Jeevan Mission (JJM and JAL SWAPNA) under command area of Surface Water Based Water Supply Scheme (Zone-IV) at Tentulia OHR site under Phase-I for Arsenic affected areas of North 24 Parganas Water Supply Division-I, P.H.E. Dte. of Barasat-I Block at Mouza Tentulia, J.L. No.114 and Choto Jagulia, J.L. No. 115 under Choto Jagulia Gram Panchayat. | ORD/000005/2021-2022 | 418/NWSD-I | 31/05/2021 | 90 | MANGES INDUSTRIAL CORPORATION | 80.70 | 71.40 | 1 | |||
| 652 | North 24 Pgs W/S Division I | Providing Functional Household Tap Connection (FHTC) in connection with Jal Jeevan Mission (JJM and JAL SWAPNA) under command area of BAGANGRAM (ZONE-I) Water Supply Scheme at BONGAON Block under North 24 Parganas water supply Division - I, PHE Dte. (Phase-II) | ORD/000006/2021-2022 | 414/NWSD-I | 27/05/2021 | 60 | GHOSH CONSTRUCTION | 37.92 | 74.81 | 1 | |||
| 653 | North 24 Pgs W/S Division I | Providing Functional Household Tap Connection (FHTC) in connection with Jal Jeevan Mission (JJM and JAL SWAPNA) under command area of Parmadan Water Supply Scheme at Bagdah Block under North 24 Parganas water supply Division - I, PHE Dte. (Phase-II) | ORD/000007/2021-2022 | 420/NWSD-I | 31/05/2021 | 90 | DEBA PRASAD MONDAL | 86.58 | 82.66 | 1 | |||
| 654 | North 24 Pgs W/S Division I | Providing Functional Household Tap Connection (FHTC) in connection with Jal Jeevan Mission (JJM and JAL SWAPNA) under command area of AULDANGA Water Supply Scheme at BAGDAH Block under North 24 Pgs. Water Supply Division-I, PHE Dte. ( Phase-II). | ORD/000009/2021-2022 | 385/NWSD-I | 12/05/2021 | 90 | SRIJAN ECOLOGICAL UPLIFTMENT PVT. LTD. | 237.57 | 427.71 | 1 | |||
| 655 | North 24 Pgs W/S Division I | Providing Functional Household Tap Connection (FHTC) in connection with Jal Jeevan Mission (JJM and JAL SWAPNA) under command area of Surface Water Based Water Supply Scheme (Zone-V) at Kharki OHR site under Phase-I for Arsenic affected areas of North 24 Parganas Water Supply Division - I, P.H.E. Dte. of Barasat-I Block at Mouza Kharki, J.L. No.132, Naksa, J.L. No.131 and Kotra, J.L.No.133 under Kotra Gram Panchayat. | ORD/000010/2021-2022 | 413/NWSD-I | 27/05/2021 | 90 | H. I. ENTERPRISE | 91.88 | 78.29 | 1 | |||
| 656 | North 24 Pgs W/S Division I | Providing Functional Household Tap Connection (FHTC) in connection with Jal Jeevan Mission (JJM and JAL SWAPNA) under command area of surface water based water supply scheme ( Zone VIII) at Kanchiara OHR site under Phase-I for Arsenic affected areas of North 24 Parganas water supply Division - I, PHE Dte. of Amdanga Block at mouza Kancharia J.L. No-16, Urla J.L.No-17 and Kaipukuria, J.L. No 19 under Adhata Gram Panchayat. | ORD/000011/2021-2022 | 412/NWSD - 1 | 27/05/2021 | 90 | TIRUPATI ENTERPRISES | 91.00 | 68.34 | 100 | |||
| 657 | North 24 Pgs W/S Division I | Providing Functional Household Tap Connection (FHTC) in connection with Jal Jeevan Mission (JJM and JAL SWAPNA) under command area of PALLA Water Supply Scheme at BONGAON Block under North 24 Parganas Water Supply Division - I, P.H.E. Dte. (Phase-I). | ORD/000013/2021-2022 | 458 / NWSD-I | 10/06/2021 | 60 | TIRUPATI ENTERPRISES | 70.90 | 69.50 | 1 | |||
| 658 | North 24 Pgs W/S Division I | Continuation order for the work of Hiring of Diesel ambassador Car / Cab with contract carriage permit of R.T.A. In good running condition both in regards to body and engine with efficient driver with valid driving license as deemed fit on daily rental basis including fulfillment of all other condition for use of the Assistant Engineer (HQ-I), North 24 Parganas W/S Division-I, P.H.E. Dte. [w.e.f. 01.06.2024 to 19.06.2024.(19 days)].(Car No.WB25J7778.) | ORD/000013/2024-2025 | 816/NWSD-I | 29/05/2024 | 19 | GITA DAS | 0.09 | 0.20 | 0 | |||
| 659 | North 24 Pgs W/S Division I | Continuation order for the work of Hiring of Diesel Cab having licensed carriage contract permit from Regional Transport Authority for the office of the Executive Engineer, North 24- Pgs. W/S Division-I, P.H.E. Dte. under the control of Assistant Engineer (HQ-II), North 24-Pgs. W/S Division-I, P.H.E. Dte. for 184 (One Hundred Eighty Four) Days. w.e.f. 01.07.2024 to 31.12.2024. | ORD/000015/2024-2025 | 948/NWSD-I | 24/06/2024 | 184 | BADAL GHOSH | 0.87 | 2.22 | 0 | |||
| 660 | North 24 Pgs W/S Division I | Continuation order for the work of Hiring of 1no. Diesel Motor Cab / Maxi Cab with contract carriage permit of R.T.A. in good running condition both in regards to body and engine with efficient driver with valid driving license as deemed fit on daily rental basis including fulfillment of all other condition for use of the Executive Engineer, North 24 Parganas Water Supply Division-I, P.H.E. Dte. for 184 (One Hundred Eighty Four) w.e.f. 01.07.2024 to 31.12.2024. [Vehicle No.WB 25L4241]. | ORD/000016/2024-2025 | 932/NWSD-I | 21/06/2024 | 184 | M/S. SHUBHA ENTERPRISE | 0.87 | 1.87 | 0 | |||
| 661 | North 24 Pgs W/S Division I | Providing Functional Household Tap Connection (FHTC) in connection with Jal Jeevan Mission (JJM and JAL SWAPNA) under command area of CHANDPUR Water Supply Scheme at BAGDAH Block under North 24 Parganas Water Supply Division - I, P.H.E. Dte. (Phase-I). | ORD/000022/2021-2022 | 504 / NWSD-I | 29/06/2021 | 60 | A.K.C. SUPPLY & CONSTRUCTION | 72.47 | 70.66 | 1 | |||
| 662 | North 24 Pgs W/S Division I | Providing Functional Household Tap Connection (FHTC) in connection with Jal Jeevan Mission (JJM and JAL SWAPNA) under command area of DIGHARI Water Supply Scheme at BONGAON Block under North 24 Parganas water supply Division - I, PHE Dte. (PHASE-I). | ORD/000037/2020-2021 | 24/NWSD-I | 08/01/2021 | 90 | MONDAL ENTERPRISE | 68.79 | 114.76 | 1 | |||
| 663 | North 24 Pgs W/S Division I | Providing Functional Household Tap Connection (FHTC) in connection with Jal Jeevan Mission (JJM and JAL SWAPNA) under command area of KHAMARKALLA Water Supply Scheme at BONGAON Block under North 24 Parganas water supply Division - I, PHE Dte. (PHASE-I). | ORD/000038/2020-2021 | 23/NWSD-I | 08/01/2021 | 90 | MONDAL ENTERPRISE | 89.99 | 138.87 | 1 | |||
| 664 | North 24 Pgs W/S Division I | Providing Functional Household Tap Connection (FHTC) in connection with Jal Jeevan Mission (JJM and JAL SWAPNA) under command area of BARAKPUR Water Supply Scheme at Bongaon Block under North 24 Parganas Water Supply Division-I, PHE Dte. (Phase-I) | ORD/000040/2020-2021 | 67/NWSD-I | 20/01/2021 | 90 | M/S. TARAK CHANDRA PAUL | 91.43 | 155.83 | 1 | |||
| 665 | North 24 Pgs W/S Division I | Providing Functional Household Tap Connection (FHTC) in connection with Jal Jeevan Mission (JJM and JAL SWAPNA) under command area of AULDANGA Water Supply Scheme at BAGDAH Block under North 24 Parganas water supply Division - I, PHE Dte. (PHASE-I). | ORD/000041/2020-2021 | 74/NWSD-I | 20/01/2021 | 90 | A.K.C. SUPPLY & CONSTRUCTION | 71.32 | 112.91 | 1 | |||
| 666 | North 24 Pgs W/S Division I | Providing Functional Household Tap Connection (FHTC) in connection with Jal Jeevan Mission (JJM and JAL SWAPNA) under command area of BANGANGRAM (ZONE-I) Water Supply Scheme at BONGAON Block under North 24 Parganas water supply Division - I, PHE Dte. (Phase-I) | ORD/000042/2020-2021 | 69/NWSD-I | 20/01/2021 | 75 | TIRUPATI ENTERPRISES | 72.30 | 112.41 | 1 | |||
| 667 | North 24 Pgs W/S Division I | Providing Functional Household Tap Connection (FHTC) in connection with Jal Jeevan Mission (JJM and JAL SWAPNA) under command area of PAIKPARA Water Supply Scheme at BONGAON Block under North 24 Parganas water supply Division - I, PHE Dte. (Phase-I) | ORD/000043/2020-2021 | 73/NWSD-I | 20/01/2021 | 90 | PUSPA ENTERPRISE | 67.26 | 125.45 | 1 | |||
| 668 | North 24 Pgs W/S Division I | Hiring of 1 (one) no. Motor Cab / Maxi Cab with contract carriage permit of R.T.A. In good running condition both in regards to body and engine with efficient driver with valid driving license as deemed fit on daily rental basis including fulfillment of all other condition for use of the Assistant Engineer, North 24 Parganas W/S Sub-Division-I, P.H.E. Dte. for 6(Six) months, i.e. 184 days. [w.e.f. 01.05.2023 to 31.10.2023] (Car No.WB25K0619) | ORD/000043/2023-2024 | 502/NWSD-I | 27/04/2023 | 184 | M/S. SHUBHA ENTERPRISE | 0.87 | 1.94 | 70 | |||
| 669 | North 24 Pgs W/S Division I | Providing Functional Household Tap Connection (FHTC) in connection with Jal Jeevan Mission (JJM and JAL SWAPNA) under command area of ICHHLAMPUR ZONE-II Water Supply Scheme at BONGAON Block under North 24 Parganas water supply Division - I, PHE Dte. (Phase-I) | ORD/000044/2020-2021 | 72/NWSD-I | 20/01/2021 | 90 | H. I. ENTERPRISE | 82.89 | 160.93 | 1 | |||
| 670 | North 24 Pgs W/S Division I | Hiring of Diesel ambassador Car / Cab with contract carriage permit of R.T.A. In good running condition both in regards to body and engine with efficient driver with valid driving license as deemed fit on daily rental basis including fulfillment of all other condition for use of the Assistant Engineer (HQ-I), North 24 Parganas W/S Division-I, P.H.E. Dte. [w.e.f. 01.06.2023 to 30.11.2023.(183 days)].(Car No.WB25J7778.) | ORD/000044/2023-2024 | 632/NWSD-I | 25/05/2023 | 183 | GITA DAS | 0.87 | 2.11 | 20 | |||
| 671 | North 24 Pgs W/S Division I | Providing Functional Household Tap Connection (FHTC) in connection with Jal Jeevan Mission (JJM and JAL SWAPNA) under command area of PASCHIM PANCHBERIA ZONE-I Water Supply Scheme at BONGAON Block under North 24 Parganas water supply Division - I, PHE Dte. (Phase-I) | ORD/000045/2020-2021 | 68/NWSD-I | 20/01/2021 | 60 | B. S. ENTERPRISE_ | 38.45 | 74.55 | 1 | |||
| 672 | North 24 Pgs W/S Division I | Hiring of 1 no. Diesel Ambassador Car/ Cab with contract carriage permit of R.T.A. in good running condition both in regards to body and engine with efficient driver with valid driving license as deemed fit on daily rental basis including fulfillment of all condition for use of the Assistant Engineer (HQ-I), North 24-Parganas W/S Division-I, P.H.E. Dte. from 20.08.2024 to 28.02.2025. i.e. 193 days. (Vehicle No. WB23E0645) | ORD/000045/2024-2025 | 1238/NWSD-I | 20/08/2024 | 193 | RAJESH JADAB | 0.92 | 1.95 | 0 | |||
| 673 | North 24 Pgs W/S Division I | Providing Functional Household Tap Connection (FHTC) in connection with Jal Jeevan Mission (JJM and JAL SWAPNA) under command area of BANGANGRAM ZONE-II Water Supply Scheme at BONGAON Block under North 24 Parganas water supply Division - I, PHE Dte. (Phase-I) | ORD/000046/2020-2021 | 75/NWSD-I | 20/01/2021 | 60 | GHOSH CONSTRUCTION | 52.31 | 91.54 | 1 | |||
| 674 | North 24 Pgs W/S Division I | Providing Functional Household Tap Connection (FHTC) in connection with Jal Jeevan Mission (JJM and JAL SWAPNA) under command area of SANTOSHPUR ZONE-II Water Supply Scheme at BONGAON Block under North 24 Parganas Water Supply Division - I, PHE Dte. (Phase-I) | ORD/000051/2020-2021 | 103/NWSD-I | 01/02/2021 | 90 | A.K.C. SUPPLY & CONSTRUCTION | 55.16 | 86.74 | 1 | |||
| 675 | North 24 Pgs W/S Division I | Providing Functional Household Tap Connection (FHTC) in connection with Jal Jeevan Mission (JJM and JAL SWAPNA) under command area of SANTOSHPUR ZONE-I Water Supply Scheme at BONGAON Block under North 24 Parganas water supply Division - I, PHE Dte. (Phase-I) | ORD/000052/2020-2021 | 104/NWSD-I | 01/02/2021 | 75 | SUDHAMAY MAJUMDAR | 63.29 | 106.65 | 1 | |||
| 676 | North 24 Pgs W/S Division I | Continuation order for the work of Hiring of Diesel Ambassador Car / Cab having licensed carriage contract permit from Regional Transport Authority for the office of the Executive Engineer, North 24- Pgs. W/S Division-I, P.H.E. Dte. at Barrackpore under the control of Assistant Engineer (HQ-II), North 24-Pgs. W/S Division-I, P.H.E. Dte. for 184 (One Hundred Eighty Four) days w.e.f. 01.07.2023 to 31.12.2023. | ORD/000054/2023-2024 | 787/NWSD-I | 23/06/2023 | 184 | BADAL GHOSH | 0.86 | 2.30 | 20 | |||
| 677 | North 24 Pgs W/S Division I | Providing Functional Household Tap Connection (FHTC) in connection with Jal Jeevan Mission (JJM and JAL SWAPNA) under command area of PASCHIM PANCHBERIA ZONE-II Water Supply Scheme at BONGAON Block under North 24 Parganas water supply Division - I, PHE Dte. (PHASE-II) | ORD/000056/2021-2022 | 880 / NWSD-I | 25/10/2021 | 60 | CHANDIMATA CONSTRUCTION | 49.34 | 49.95 | 1 | |||
| 678 | North 24 Pgs W/S Division I | Continuation order for the work of Hiring of 1no. Diesel Motor Cab / Maxi Cab with contract carriage permit of R.T.A. in good running condition on daily rental basis for JJM works under Office of the Executive Engineer, North 24 Parganas Water Supply Division-I, P.H.E. Dte. for 184 (One Hundred Eighty Four) w.e.f. 01.07.2024 to 31.12.2024. [Vehicle No.WB 23C 5335] | ORD/000058/2024-2025 | 963/NWSD-I | 26/06/2024 | 184 | M/S. SHUBHA ENTERPRISE | 0.86 | 2.31 | 100 | |||
| 679 | North 24 Pgs W/S Division I | Providing Functional Household Tap Connection (FHTC) in connection with Jal Jeevan Mission (JJM and JAL SWAPNA) under command area of SANTOSHPUR ZONE-II Water Supply Scheme at BONGAON Block under North 24 Parganas water supply Division - I, PHE Dte. (PHASE-II). | ORD/000063/2021-2022 | 848/NWSD-I | 07/10/2021 | 60 | M/S. R. M. CONSTRUCTION | 62.20 | 61.73 | 1 | |||
| 680 | North 24 Pgs W/S Division I | Providing Functional Household Tap Connection (FHTC) in connection with Jal Jeevan Mission (JJM and JAL SWAPNA) under command area of KHAMARKALLA Water Supply Scheme at BONGAON Block under North 24 Parganas water supply Division - I, PHE Dte. (PHASE-II) | ORD/000064/2021-2022 | 863/NWSD-I | 08/10/2021 | 75 | M/S. TARAK CHANDRA PAUL | 80.93 | 80.92 | 1 | |||
| 681 | North 24 Pgs W/S Division I | Continuation order for the work of Hiring of 1 (one) no. Motor Cab / Maxi Cab with contract carriage permit of R.T.A. In good running condition both in regards to body and engine with efficient driver with valid driving license as deemed it on daily rental basis including fulfillment of all other condition for use of the Assistant Engineer, North 24 Parganas W/S Sub-Division-I, P.H.E. Dte. for 6(Six) months, i.e. 181 days. [w.e.f. 01.11.2024 to 30.04.2025] (Car No.WB25K0619) | ORD/000064/2024-2025 | 1571/NWSD-I | 25/10/2024 | 181 | M/S. SHUBHA ENTERPRISE | 0.86 | 0.66 | 0 | |||
| 682 | North 24 Pgs W/S Division I | Providing Functional Household Tap Connection (FHTC) in connection with Jal Jeevan Mission (JJM and JAL SWAPNA) under command area of PASCHIM PANCHBERIA ZONE-I Water Supply Scheme at BONGAON Block under North 24 Parganas water supply Division - I, PHE Dte. (PHASE-II). | ORD/000065/2021-2022 | 850/NWSD-I | 07/10/2021 | 60 | B. S. ENTERPRISE | 68.70 | 70.56 | 1 | |||
| 683 | North 24 Pgs W/S Division I | Providing Functional Household Tap Connection (FHTC) in connection with Jal Jeevan Mission (JJM and JAL SWAPNA) within command area of surface water based water supply scheme ( Zone II) at Berunanpukuria OHR site at Barasat-I Block for Arsenic affected areas under North 24 Parganas water supply Division - I, PHE Dte. | ORD/000066/2021-2022 | 864/NWSD-I | 08/10/2021 | 75 | PUSPA ENTERPRISE | 79.59 | 81.18 | 1 | |||
| 684 | North 24 Pgs W/S Division I | Providing Functional Household Tap Connection (FHTC) in connection with Jal Jeevan Mission (JJM and JAL SWAPNA) under command area of BAYRA Water Supply Scheme at BAGDAH Block under North 24 Parganas water supply Division - I, PHE Dte (PHASE-I). | ORD/000067/2021-2022 | 851/NWSD-I | 07/10/2021 | 75 | A.K.C. SUPPLY & CONSTRUCTION | 82.11 | 82.21 | 1 | |||
| 685 | North 24 Pgs W/S Division I | Providing Functional Household Tap Connection (FHTC) in connection with Jal Jeevan Mission (JJM and JAL SWAPNA) under command area of PARMADAN Water Supply Scheme at BAGDAH Block under North 24 Parganas water supply Division - I, PHE Dte. (PHASE-I) | ORD/000068/2021-2022 | 865/NWSD-I | 08/10/2021 | 60 | M/S - SUKANTA ENTERPRISE | 49.19 | 50.37 | 1 | |||
| 686 | North 24 Pgs W/S Division I | Providing Functional Household Tap Connection (FHTC) in connection with Jal Jeevan Mission (JJM and JAL SWAPNA) under command area of PASCHIM PANCHBERIA ZONE-II Water Supply Scheme at BONGAON Block under North 24 Parganas water supply Division - I, PHE Dte. (PHASE-I). | ORD/000069/2021-2022 | 849/NWSD-I | 07/10/2021 | 60 | H. I. ENTERPRISE | 58.98 | 58.92 | 1 | |||
| 687 | North 24 Pgs W/S Division I | Providing Functional Household Tap Connection (FHTC) in connection with Jal Jeevan Mission (JJM and JAL SWAPNA) within the command area of surface water based water supply scheme (Zone VII) at Khoru OHR site at Amdanga Block for Arsenic affected areas of North 24 Parganas water supply Division - I, PHE Dte. (2nd. Call) | ORD/000070/2021-2022 | 1129/NWSD-I | 22/12/2021 | 60 | ALOK ENTERPRISE, A UNIT OF SAKET TREXIM PVT. LTD. | 78.07 | 57.77 | 100 | |||
| 688 | North 24 Pgs W/S Division I | Providing Functional Household Tap Connection (FHTC) in connection with Jal Jeevan Mission (JJM and JAL SWAPNA) under command area of GAINPUR Water Supply Scheme at BONGAON Block under North 24 Parganas water supply Division - I, PHE Dte. (Phase-I) | ORD/000071/2021-2022 | 852/NWSD-I | 07/10/2021 | 75 | DAS TRADING | 48.75 | 48.08 | 1 | |||
| 689 | North 24 Pgs W/S Division I | Providing Functional Household Tap Connection (FHTC) in connection with Jal Jeevan Mission (JJM and JAL SWAPNA) under command area of BANGANGRAM (ZONE-II) Water Supply Scheme at BONGAON Block under North 24 Parganas water supply Division - I, PHE Dte. (PHASE-II) | ORD/000072/2021-2022 | 944/NWSD-I | 12/11/2021 | 60 | MONDAL ENTERPRISE | 52.24 | 50.74 | 1 | |||
| 690 | North 24 Pgs W/S Division I | Providing Functional Household Tap Connection (FHTC) in connection with Jal Jeevan Mission (JJM and JAL SWAPNA) under command area of MOLLAHATI Water Supply Scheme at BONGAON Block under North 24 Parganas water supply Division - I, PHE Dte. (Phase-I) | ORD/000074/2021-2022 | 962/NWSD-I | 16/11/2021 | 75 | ONKAR ENTERPRISE | 92.39 | 93.37 | 1 | |||
| 691 | North 24 Pgs W/S Division I | Hiring of 1(one) No. Motor Cab / Maxi Cab with contract carriage Permit of R.T.A. In good running condition both in regards to body and engine with efficient driver with valid driving license as deemed fit on daily rental basis including fulfillment of all other condition for use of the Assistant Engineer, North 24 Parganas Water Supply Sub-Divn-I, PHE Dte. for 6(Six) months w.e.f.01.10.2022. | ORD/000077/2022-2023 | 1080 / NWSD-I | 29/09/2022 | 6 | SOMNATH KAIPUTRA | 0.86 | 2.00 | 100 | |||
| 692 | North 24 Pgs W/S Division I | Providing Functional Household Tap Connection (FHTC) in connection with Jal Jeevan Mission (JJM and JAL SWAPNA) under command area of surface water based W/S scheme for Arsenic affected areas of Deganga Block under North 24 Parganas water supply Division - I, PHE Dte. | ORD/000078/2020-2021 | 205/NWSD-I | 26/02/2021 | 90 | PUSPA ENTERPRISE | 96.34 | 83.55 | 1 | |||
| 693 | North 24 Pgs W/S Division I | Providing Functional Household Tap Connection (FHTC) in connection with Jal Jeevan Mission (JJM and JAL SWAPNA) within command area of Surface water based Water Supply Scheme (Zone-VI) at BERABERIA OHR site from Arsenic affected areas of North 24 Parganas water supply Division - I, PHE Dte. | ORD/000084/2021-2022 | 1005/NWSD-I | 24/11/2021 | 90 | J. D. J. ENTERPRISE, A UNIT OF JDJ TRADERS PRIVATE LIMITED | 224.61 | 202.33 | 100 | |||
| 694 | North 24 Pgs W/S Division I | Hiring of 1 (one) no. Motor Cab / Maxi Cab with contract carriage permit of R.T.A. In good running condition both in regards to body and engine with efficient driver with valid driving license as deemed fit on daily rental basis including fulfillment of all other condition for use of the Assistant Engineer (HQ-I), North 24 Parganas W/S Division-I, P.H.E. Dte. for 182 (one hundred eighty two) days w.e.f. 01.10.2022 to 31.03.2023. | ORD/000089/2022-2023 | 1078/NWSD-I | 29/09/2022 | 182 | GITA DAS | 0.86 | 1.98 | 100 | |||
| 695 | North 24 Pgs W/S Division I | Hiring of Diesel Ambassador Car / Cab having licensed carriage contract permit from Regional Transport Authority for the office of the Executive Engineer, North 24- Pgs. W/S Division-I, P.H.E. Dte. at Barrackpore under the control of Assistant Engineer (HQ-II), North 24-Pgs. W/S Division-I, P.H.E. Dte. for 1 (One) year w.e.f. 01.1.2022. | ORD/000093/2021-2022 | 1088/NWSD-I | 16/12/2021 | 365 | BADAL GHOSH | 1.72 | 1.36 | 50 | |||
| 696 | North 24 Pgs W/S Division I | Providing Functional Household Tap Connection (FHTC) in connection with Jal Jeevan Mission (JJM and JAL SWAPNA) within command area of surface water based water supply scheme ( Zone III) at Algoria OHR site at Barasat-I Block for Arsenic affected areas of North 24 Parganas water supply Division - I, PHE Dte. (2nd Call) | ORD/000102/2021-2022 | 1130/NWSD-I | 22/12/2021 | 60 | ALOK ENTERPRISE, A UNIT OF SAKET TREXIM PVT. LTD. | 84.33 | 65.28 | 100 | |||
| 697 | North 24 Pgs W/S Division I | Hiring of Diesel Ambassador Car / Cab having licensed carriage contract permit from Regional Transport Authority for the office of the Executive Engineer, North 24- Pgs. W/S Division-I, P.H.E. Dte. at Barrackpore under the control of Assistant Engineer (HQ-II), North 24-Pgs. W/S Division-I, P.H.E. Dte. for 181 (One Hundred Eighty One) days w.e.f. 01.1.2023 to 30.06.2023. | ORD/000111/2022-2023 | 1451/NWSD- I | 22/12/2022 | 181 | BADAL GHOSH | 0.85 | 2.11 | 51 | |||
| 698 | North 24 Pgs W/S Division I | Survey, Design and preparation of Retrofitting DPR in connection with Providing functional household tap connection to every Household under Bayra W/S scheme in North 24 Pgs. District under North 24 Pgs. W/S Sub-Division-I, P.H.E. Dte. | ORD/000114/2021-2022 | 1175/NWSD-I | 31/12/2021 | 7 | SRIJAN ECOLOGICAL UPLIFTMENT PVT. LTD. | 4.18 | 4.18 | 1 | |||
| 699 | North 24 Pgs W/S Division I | Continuation order for the work of Hiring of 1 (one) no Motor Cab / Maxi Cab with contract carriage permit of R.T.A. In good running condition both in regards to body and engine with efficient driver with valid driving license as deemed fit on daily rental basis including fulfillment of all other condition for use of the Executive Engineer, North 24 Parganas W/S Division-I, P.H.E. Dte. for 181 (one hundred eighty one) days w.e.f 01/09/2022 to 28/02/2023. | ORD/000122/2022-2023 | 1018/NWSD-I | 24/08/2022 | 181 | M/S. SHUBHA ENTERPRISE | 0.86 | 1.81 | 100 | |||
| 700 | North 24 Pgs W/S Division I | Continuation order for the work of Hiring of 1 (one) no Motor Cab / Maxi Cab with contract carriage permit of R.T.A. In good running condition both in regards to body and engine with efficient driver with valid driving license as deemed fit on daily rental basis including fulfillment of all other condition for use of the Executive Engineer, North 24 Parganas W/S Division-I, P.H.E. Dte. for 122 (One Hundred Twenty Two) days w.e.f 01/09/2023 to 31/12/2023.[Car No.WB 25L 4241]. | ORD/000163/2023-2024 | 1296/NWSD-I | 24/08/2023 | 122 | M/S. SHUBHA ENTERPRISE | 0.58 | 1.20 | 50 | |||
| 701 | North 24 Pgs W/S Division I | Continuation for the work of Hiring of 1 (one) no Motor Cab / Maxi Cab with contract carriage permit of R.T.A. In good running condition both in regards to body and engine with efficient driver with valid driving license as deemed fit on daily rental basis including fulfillment of all other condition for use of the Assistant Engineer, North 24 Parganas W/S Sub Division-I, P.H.E. Dte. for 1 (one) Month w.e.f 01/04/2023 to 30/04/2023. | ORD/000176/2022-2023 | 358/NWSD-I | 29/03/2023 | 31 | SOMNATH KAIPUTRA | 0.14 | 0.16 | 100 | |||
| 702 | North 24 Pgs W/S Division I | Continuation for Hiring of 1 (one) no. Motor Cab / Maxi Cab with contract carriage permit of R.T.A. In good running condition both in regards to body and engine with efficient driver with valid driving license as deemed fit on daily rental basis including fulfillment of all other condition for use of the Assistant Engineer (HQ-I), North 24 Parganas W/S Division-I, P.H.E. Dte. for 61 (Sixty One) days w.e.f. 01.04.2023 to 31.05.2023.(Vehicle No.WB-25J-7778 ) | ORD/000180/2022-2023 | 364/NWSD-I | 31/03/2023 | 61 | GITA DAS | 0.29 | 0.71 | 90 | |||
| 703 | North 24 Pgs W/S Division I | Continuation order for the work of Hiring of 1 (one) no. Motor Cab / Maxi Cab with contract carriage permit of R.T.A. In good running condition both in regards to body and engine with efficient driver with valid driving license as deemed it on daily rental basis including fulfillment of all other condition for use of the Assistant Engineer, North 24 Parganas W/S Sub-Division-I, P.H.E. Dte. for 6(Six) months, i.e. 182 days. [w.e.f. 01.11.2023 to 30.04.2024] (Car No.WB25K0619) | ORD/000182/2023-2024 | 1646/NWSD-I | 16/10/2023 | 182 | M/S. SHUBHA ENTERPRISE | 0.86 | 1.86 | 67 | |||
| 704 | North 24 Pgs W/S Division I | Survey, Design and preparation of Retrofitting DPR in connection with " Providing functional household tap connection to every Household under Parmadan W/S scheme in North 24 Pgs. District under North 24 Pgs. W/S Sub-Division-I, P.H.E. Dte. | ORD/000195/2021-2022 | 218/NWSD - I | 21/02/2022 | 7 | SRIJAN ECOLOGICAL UPLIFTMENT PVT. LTD. | 3.23 | 3.23 | 1 | |||
| 705 | North 24 Pgs W/S Division I | Continuation order for the work of Hiring of 1 (one) no Motor Cab / Maxi Cab with contract carriage permit of R.T.A. In good running condition both in regards to body and engine with efficient driver with valid driving license as deemed fit on daily rental basis including fulfillment of all other condition for use of the Executive Engineer, North 24 Parganas W/S Division-I, P.H.E. Dte. for 184 (one hundred eighty four) days w.e.f 01/03/2023 to 31/08/2023.[Car No.WB 25L 4241]. | ORD/000200/2022-2023 | 168/NWSD-I | 16/02/2023 | 184 | M/S. SHUBHA ENTERPRISE | 0.87 | 2.07 | 65 | |||
| 706 | North 24 Pgs W/S Division I | Continuation order for the work of Hiring of Diesel ambassador Car / Cab with contract carriage permit of R.T.A. In good running condition both in regards to body and engine with efficient driver with valid driving license as deemed fit on daily rental basis including fulfillment of all other condition for use of the Assistant Engineer (HQ-I), North 24 Parganas W/S Division-I, P.H.E. Dte. [w.e.f. 01.12.2023 to 31.05.2024.(183 days)].(Car No.WB25J7778.) | ORD/000214/2023-2024 | 1920/NWSD-I | 29/11/2023 | 183 | GITA DAS | 0.87 | 2.13 | 16 | |||
| 707 | North 24 Pgs W/S Division I | Hiring of Diesel Ambassador Car / Cab having licensed carriage contract permit from Regional Transport Authority for the office of the Executive Engineer, North 24- Pgs. W/S Division-I, P.H.E. Dte. at Barrackpore under the control of Assistant Engineer (HQ-II), North 24-Pgs. W/S Division-I, P.H.E. Dte. for 1 (One) year w.e.f. 01.1.2022. | ORD/000256/2021-2022 | 1088/NWSD- I | 16/12/2021 | 1 | BADAL GHOSH | 1.72 | 0.90 | 100 | |||
| 708 | North 24 Pgs W/S Division I | Hiring of 1no. Diesel Motor Cab / Maxi Cab with contract carriage permit of R.T.A. in good running condition both in regards to body and engine with efficient driver with valid driving license as deemed fit on daily rental basis including fulfillment of all other condition for use of the Executive Engineer, North 24 Parganas Water Supply Division-I, P.H.E. Dte. for 182 (One Hundred Eighty Two) w.e.f. 01.01.2024 to 30.06.2024. [Vehicle No.WB 25L4241] | ORD/000265/2023-2024 | 2201/NWSD-I | 29/12/2023 | 182 | M/S. SHUBHA ENTERPRISE | 0.86 | 1.95 | 0 | |||
| 709 | North 24 Pgs W/S Division I | Hiring of 1no. Diesel Motor Cab / Maxi Cab with contract carriage permit of R.T.A. in good running condition on daily rental basis for JJM works under Office of the Executive Engineer, North 24 Parganas Water Supply Division-I, P.H.E. Dte. for 182 (One Hundred Eighty Two) w.e.f. 01.01.2024 to 30.06.2024. [Vehicle No.WB 23C 5335] | ORD/000266/2023-2024 | 2200/NWSD-I | 29/12/2023 | 182 | M/S. SHUBHA ENTERPRISE | 0.86 | 2.24 | 100 | |||
| 710 | North 24 Pgs W/S Division I | Hiring of Diesel Cab having licensed carriage contract permit from Regional Transport Authority for the office of the Executive Engineer, North 24- Pgs. W/S Division-I, P.H.E. Dte. under the control of Assistant Engineer (HQ-II), North 24-Pgs. W/S Division-I, P.H.E. Dte. for 182 (One Hundrad Eighty Two) Days. w.e.f. 01.01.2024 to 30.06.2024. | ORD/000327/2023-2024 | 2196/NWSD-I | 29/12/2023 | 182 | BADAL GHOSH | 0.86 | 2.25 | 16 | |||
| 711 | North 24 Pgs W/S Division I | Material Requisition To Resource Division | RTOR000003/2021-2022 | 01/NWSD-I | 03/01/2022 | 0 | Resource Division | 7.98 | 0.00 | 0 | |||
| 712 | North 24 Pgs W/S Division I | Material Requisition To Resource Division | RTOR000004/2021-2022 | 02/NWSD-I | 03/01/2022 | 0 | Resource Division | 8.77 | 0.00 | 0 | |||
| 713 | North 24 Pgs W/S Division I | Material Requisition To Resource Division | RTOR000005/2021-2022 | 03/NWSD-I | 03/01/2022 | 0 | Resource Division | 11.00 | 0.00 | 0 | |||
| 714 | Barasat Arsenic Division | Providing Functional House Hold Tap Connection and allied works at kankrasuti mouza of Baduria Block from Jashaikati Zone -I & Its Adjoining Mouzas Ground Water Supply Scheme Under '' JAL SWAPNA'' programme under Barasat Arsenic Division PHE, Dte. (Phase-I). | ORD/000002/2021-2022 | 1035/B.Ar.D. | 07/06/2021 | 90 | UTPAL CONSTRUCTION AND CO | 96.04 | 28.31 | 100 | |||
| 715 | Barasat Arsenic Division | Providing Functional House Hold Tap Connection and allied works at Ramchandrapur mouza of Baduria Block from Jashaikati Zone -II & Its Adjoining Mouzas Ground Water Supply Scheme Under '' JAL SWAPNA'' programme under Barasat Arsenic Division PHE, Dte. (Phase-I) | ORD/000003/2021-2022 | 1036/B.Ar.D. | 07/06/2021 | 90 | M/S. S. S. ENTERPRISE | 91.60 | 80.27 | 1 | |||
| 716 | Barasat Arsenic Division | Providing Functional House Hold Tap Connection and allied works at Palitpara, Rohanda, Noapara, Banpol, Singhapra mouza's of Barasat - II Block from Rohanda & Its Adjoining Mouzas Ground Water Supply Scheme Under '' JAL SWAPNA'' programme under Barasat Arsenic Division PHE, Dte. (Phase-I) | ORD/000004/2021-2022 | 1037/B.Ar.D. | 07/06/2021 | 90 | S. P. CONSTRUCTION | 95.15 | 177.38 | 100 | |||
| 717 | Barasat Arsenic Division | Route survey, distribution design & DPR preparation for Providing FHTC (Functional Household Tap Connection) by retrofitting under Jal Swapna for Atapur Water Supply Scheme in Sandeshkhali - II Block of North 24 Pargana District under Barasat Arsenic Division, PHE Dte. | ORD/000026/2021-2022 | 1440/B.Ar.D | 31/08/2021 | 15 | RISHAN ENGINEERING CONSULTANCY | 2.41 | 2.41 | 0 | |||
| 718 | Barasat Arsenic Division | Route survey, distribution design & DPR preparation for Providing FHTC (Functional Household Tap Connection) by retrofitting under Jal Swapna for Jasaikhati Zone - I & its adjoining mouza Water Supply Scheme in Baduria Block of North 24 Pargana District under Barasat Arsenic Division, PHE Dte. | ORD/000027/2021-2022 | 1441/B.Ar.D | 31/08/2021 | 15 | SIRCON ENGINEERING SERVICES | 4.70 | 4.70 | 1 | |||
| 719 | Barasat Arsenic Division | Repair & Renovation of Iron Elimination Plant of 161 M3 including Media Change of Puturia Water Supply Scheme under Barasat- II Block Under Barasat Arsenic Division, PHE Dte. | ORD/000027/2023-2024 | 1165/B.Ar.D. | 16/05/2023 | 30 | GHOSH CONSTRUCTION | 8.71 | 8.32 | 100 | |||
| 720 | Barasat Arsenic Division | Route survey, distribution design & DPR preparation for Providing FHTC (Functional Household Tap Connection) by retrofitting under Jal Swapna for Jeliakhali Paschim Khanda Water Supply Scheme in Sandeshkhali - II Block of North 24 Pargana District under Barasat Arsenic Division, PHE Dte. | ORD/000028/2021-2022 | 1442/B.Ar.D | 31/08/2021 | 15 | SIRCON ENGINEERING SERVICES | 4.71 | 4.03 | 1 | |||
| 721 | Barasat Arsenic Division | Route survey, distribution design & DPR preparation for Providing FHTC (Functional Household Tap Connection) by retrofitting under Jal Swapna for Konanagar , Rajapura & its adjoining mouza Water Supply Scheme in Hasnabad Block of North 24 Pargana District under Barasat Arsenic Division, PHE Dte. | ORD/000029/2021-2022 | 1443/B.Ar.D | 31/08/2021 | 15 | SIRCON ENGINEERING SERVICES | 4.74 | 4.39 | 1 | |||
| 722 | Barasat Arsenic Division | Withdrawal and Relaying of 160 mm dia. HDPE rising main pipeline along with protection work and other allied works near 2nd Pump House under Tildanga W/S Scheme under Barasat Arsenic Division, PHE Dte. | ORD/000029/2023-2024 | 1168/B.Ar.D. | 16/05/2023 | 30 | M/S DATTA ENTERPRISE | 4.84 | 4.78 | 100 | |||
| 723 | Barasat Arsenic Division | Route survey, Distribution design & DPR preparation for Providing FHTC (Functional Household Tap Connection) by retrofitting under Jal Swapna for Krishnapara & its adjoining mouza Water Supply Scheme in Hasnabad Block of North 24 Pargana District under Barasat Arsenic Division, PHE Dte | ORD/000030/2021-2022 | 1444/B.Ar.D | 31/08/2021 | 15 | RISHAN ENGINEERING CONSULTANCY | 2.49 | 2.49 | 1 | |||
| 724 | Barasat Arsenic Division | Route survey, distribution design & DPR preparation for Providing FHTC (Functional Household Tap Connection) by retrofitting under Jal Swapna for Magurati Srirampur, Tildanga & its adjoining mouza Water Supply Scheme in Baduria Block of North 24 Pargana District under Barasat Arsenic Division, PHE Dte. | ORD/000031/2021-2022 | 1445/B.Ar.D | 31/08/2021 | 15 | SIRCON ENGINEERING SERVICES | 4.06 | 4.06 | 1 | |||
| 725 | Barasat Arsenic Division | Providing Functional House Hold Tap Connection and allied works at Khorda, Jalsira and Konanagar Mouzas of Hasnabad Block from Konanagar Ground Water Supply Scheme Under " Jal swapna" programme under Barasat Arsenic Division PHE, Dte. ( Phase-I ). | ORD/000035/2020-2021 | 1880/B.Ar.D. | 18/12/2020 | 90 | M/S ROY CHOWDHURY & CO. | 82.20 | 146.38 | 1 | |||
| 726 | Barasat Arsenic Division | Providing Functional House Hold Tap Connection and allied works at Jeliakhali Pashchim Mouza of Sandeshkhali-II Block from Jeliakhali Pashchim Khanda Ground Water Supply Scheme Under " Jal swapna" programme under Barasat Arsenic Division PHE, Dte. | ORD/000038/2020-2021 | 1883/B.Ar.D. | 18/12/2020 | 90 | M/S. S. S. ENTERPRISE | 96.55 | 191.44 | 1 | |||
| 727 | Barasat Arsenic Division | Route survey, Distribution designe & DPR preparation for Providing FHTC (Functional Household Tap Connection) by retrofitting under Jal Swapna for Bagband Saiberia & its adjoining mouza Water Supply Scheme in Barasat -II Block of North 24 Pargana District under Barasat Arsenic Division, PHE Dte. | ORD/000038/2021-2022 | 1562/B.Ar.D. | 15/09/2021 | 15 | SRIJAN ECOLOGICAL UPLIFTMENT PVT. LTD. | 6.94 | 6.94 | 1 | |||
| 728 | Barasat Arsenic Division | Providing Functional House Hold Tap Connection and allied works at Ghola, Rajapura and Chalitabaria Mouzas of Hasnabad Block from Rajapura Ground Water Supply Scheme Under " Jal swapna" programme under Barasat Arsenic Division PHE, Dte. | ORD/000039/2020-2021 | 1881/B.Ar.D. | 18/12/2020 | 90 | UTPAL CONSTRUCTION AND CO | 96.59 | 61.47 | 1 | |||
| 729 | Barasat Arsenic Division | Route survey, Distribution designe & DPR preparation for Providing FHTC (Functional Household Tap Connection) by retrofitting under Jal Swapna for Puturia & its adjoining mouza Water Supply Scheme in Barasat -II Block of North 24 Pargana District under Barasat Arsenic Division, PHE Dte. | ORD/000039/2021-2022 | 1563/B.Ar.D. | 15/09/2021 | 15 | SRIJAN ECOLOGICAL UPLIFTMENT PVT. LTD. | 6.19 | 6.19 | 1 | |||
| 730 | Barasat Arsenic Division | Providing Functional House Hold Tap Connection and allied works at Dwarir Jangle Mouza of Sandeshkhali-II Block from Dwarir Jangle Ground Water Supply Scheme Under " Jal swapna" programme under Barasat Arsenic Division PHE, Dte. | ORD/000040/2020-2021 | 1882/B.Ar.D. | 18/12/2020 | 90 | UTPAL CONSTRUCTION AND CO | 96.31 | 167.65 | 1 | |||
| 731 | Barasat Arsenic Division | Route survey, Distribution designe & DPR preparation for Providing FHTC (Functional Household Tap Connection) by retrofitting under Jal Swapna for Rohanda & its adjoining mouza Water Supply Scheme in Barasat -II Block of North 24 Pargana District under Barasat Arsenic Division, PHE Dte. | ORD/000040/2021-2022 | 1564/B.Ar.D. | 15/09/2021 | 15 | SRIJAN ECOLOGICAL UPLIFTMENT PVT. LTD. | 5.78 | 5.58 | 1 | |||
| 732 | Barasat Arsenic Division | Providing Functional House Hold Tap Connection and allied works at Muragachha, Harikati and Krishnapara Mouzas of Hasnabad Block from Krishnapara Ground Water Supply Scheme Under " Jal swapna" programme under Barasat Arsenic Division PHE, Dte. ( Phase-I ) | ORD/000041/2020-2021 | 1884/B.Ar.D. | 18/12/2020 | 90 | UTPAL CONSTRUCTION AND CO | 83.30 | 232.04 | 1 | |||
| 733 | Barasat Arsenic Division | Providing Functional House Hold Tap Connection and allied works at Chaumuha Mouza of Barasat- II Block from Chaumuha Ground Water Supply Scheme Under " Jal swapna" programme under Barasat Arsenic Division PHE, Dte. (Phase-I) | ORD/000042/2020-2021 | 1885/B.Ar.D. | 18/12/2020 | 90 | UMWELT ENGINEER PVT. LTD. | 91.50 | 165.64 | 1 | |||
| 734 | Barasat Arsenic Division | Providing Functional House Hold Tap Connection and allied works at Magurati Srirampur Mouza of Baduria Block from Magurati Srirampur Ground Water Supply Scheme Under " Jal swapna" programme under Barasat Arsenic Division PHE, Dte. | ORD/000043/2020-2021 | 1886/B.Ar.D. | 18/12/2020 | 90 | UMA CONSTRUCTION | 39.19 | 69.70 | 1 | |||
| 735 | Barasat Arsenic Division | Repair & Renovation of Iron Elimination Plant of 69 M3 including Media Change of Chowlpur Water Supply Scheme under Barasat - II Block under Barasat Arsenic Division, PHE Dte. | ORD/000049/2022-2023 | 1352/B.Ar.D | 22/07/2022 | 30 | WATERCOMP INDIA | 4.74 | 4.71 | 1 | |||
| 736 | Barasat Arsenic Division | Providing Functional House Hod Connection and Allied workas at Ramchandra pur khas pur, Hugle and Keutsa Mouzas of Baduria Block from Jasikhati Zone-II & Its Adjoining Mouzas Ground Water Supply Scheme Under " Jal Swapna " Programme under Barasat Arsenic Division PHE, Dte. (Phase-II) | ORD/000052/2021-2022 | 1709/B.Ar.D. | 01/10/2021 | 90 | UTPAL CONSTRUCTION AND CO | 73.47 | 72.36 | 1 | |||
| 737 | Barasat Arsenic Division | Providing Functional House Hod Connection and Allied workas at Kamduni and Kharibari Mouzas of Barasat II Block from Mahisgadi & Its Adjoining Mouzas Ground Water Supply Scheme Under " Jal Swapna " Programme under Barasat Arsenic Division PHE, Dte. (Phase-II) | ORD/000053/2021-2022 | 1710/B.Ar.D. | 01/10/2021 | 90 | BALAJEE ENTERPRISES | 51.31 | 51.22 | 1 | |||
| 738 | Barasat Arsenic Division | Providing Functional House Hod Connection and Allied workas at 6 nos habitation of Dwarir Jangle Mouzas of Sandeshkhali II Block from Dwarir Jangle Ground Water Supply Scheme Under " Jal Swapna " Programme under Barasat Arsenic Division PHE, Dte. (Phase-II) | ORD/000054/2021-2022 | 1711/B.Ar.D. | 01/10/2021 | 90 | A P POWER AND CONCRETE | 45.66 | 43.57 | 1 | |||
| 739 | Barasat Arsenic Division | Emergent works of Development of Land, Protection of Pipe line and Road restoration due to laying of UPVC/HDPE Pipe line for providing FHTC of MAHISHGADI Water Supply Scheme under Barasat - II Block under Barasat Arsenic Division, PHE Dte. | ORD/000054/2023-2024 | 1647/B.Ar.D. | 14/07/2023 | 45 | BALAJEE ENTERPRISES | 24.37 | 24.35 | 100 | |||
| 740 | Barasat Arsenic Division | Route survey, distribution design & DPR preparation for providing FHTC (Functional Household Tap Connection) by retrofitting under Jal Swapna for Bahira & its adjoining mouza water supply scheme in Barasat -II Block of North 24 Pargana District under Barasat Arsenic Division, PHE Dte. | ORD/000060/2021-2022 | 1692/B.Ar.D | 30/09/2021 | 15 | SRIJAN ECOLOGICAL UPLIFTMENT PVT. LTD. | 4.62 | 4.62 | 1 | |||
| 741 | Barasat Arsenic Division | Route survey, distribution design & DPR preparation for providing FHTC (Functional Household Tap Connection) by retrofitting under Jal Swapna for Chowlpur & its adjoining mouza water supply scheme in Barasat -II Block of North 24 Pargana District under Barasat Arsenic Division, PHE Dte. | ORD/000061/2021-2022 | 1698/B.Ar.D | 30/09/2021 | 15 | SRIJAN ECOLOGICAL UPLIFTMENT PVT. LTD. | 3.04 | 3.04 | 1 | |||
| 742 | Barasat Arsenic Division | Route survey, distribution design & DPR preparation for providing FHTC (Functional Household Tap Connection) by retrofitting under Jal Swapna for Chowmuha & its adjoining mouza water supply scheme in Barasat -II Block of North 24 Pargana District under Barasat Arsenic Division, PHE Dte. | ORD/000062/2021-2022 | 1699/B.Ar.D | 30/09/2021 | 15 | SRIJAN ECOLOGICAL UPLIFTMENT PVT. LTD. | 3.38 | 3.35 | 1 | |||
| 743 | Barasat Arsenic Division | Route survey, distribution design & DPR preparation for providing FHTC (Functional Household Tap Connection) by retrofitting under Jal Swapna for Mahisgadi & its adjoining mouza water supply scheme in Barasat - II Block of North 24 Pargana District under Barasat Arsenic Division, PHE Dte. | ORD/000063/2021-2022 | 1700/B.Ar.D | 30/09/2021 | 15 | UMWELT ENGINEER PVT. LTD. | 2.95 | 2.95 | 1 | |||
| 744 | Barasat Arsenic Division | Route survey, distribution design & DPR preparation for providing FHTC (Functional Household Tap Connection) by retrofitting under Jal Swapna for Paltadanga & its adjoining mouza water supply scheme in Barasat - II Block of North 24 Pargana District under Barasat Arsenic Division, PHE Dte. | ORD/000064/2021-2022 | 1701/B.Ar.D | 30/09/2021 | 15 | UMWELT ENGINEER PVT. LTD. | 4.70 | 4.70 | 1 | |||
| 745 | Barasat Arsenic Division | Route survey, distribution design & DPR preparation for providing FHTC (Functional Household Tap Connection) by retrofitting under Jal Swapna for Dwarir Jangle water supply scheme in Sandeshkhali - II Block of North 24 Pargana District under Barasat Arsenic Division, PHE Dte. | ORD/000065/2021-2022 | 1702/B.Ar.D | 30/09/2021 | 15 | SIRCON ENGINEERING SERVICES | 4.68 | 4.68 | 1 | |||
| 746 | Barasat Arsenic Division | Route survey, distribution design & DPR preparation for providing FHTC (Functional Household Tap Connection) by retrofitting under Jal Swapna for Jashaikati Zone - II & its adjoining mouza water supply scheme in Baduria Block of North 24 Pargana District under Barasat Arsenic Division, PHE Dte. | ORD/000066/2021-2022 | 1703/B.Ar.D | 30/09/2021 | 15 | SIRCON ENGINEERING SERVICES | 4.70 | 4.70 | 1 | |||
| 747 | Barasat Arsenic Division | Providing Functional House Hod Connection and Allied workas at Dhokra and Khamar Nowabad Mouzas of Barasat II Block from Chaumuha & Its Adjoining Mouzas Ground Water Supply Scheme Under " Jal Swapna " Programme under Barasat Arsenic Division PHE, Dte. (Phase-II) | ORD/000073/2021-2022 | 1724/B.Ar.D. | 01/10/2021 | 90 | BALAJEE ENTERPRISES | 72.05 | 71.90 | 1 | |||
| 748 | Barasat Arsenic Division | Providing Functional House Hod Connection and Allied workas at 4 nos habitation of Jelia Khali Paschim Khanda Mouzas of Sandeshkhali II Block from Jeliakhali Paschim Khanda Ground Water Supply Scheme Under " Jal Swapna " Programme under Barasat Arsenic Division PHE, Dte. (Phase-II) | ORD/000074/2021-2022 | 1725/B.Ar.D. | 01/10/2021 | 90 | BALAJEE ENTERPRISES | 51.57 | 51.54 | 85 | |||
| 749 | Barasat Arsenic Division | Repairing and renovation of 02 (two) nos pump house and 01 (one) no I.E.P room and allied works at the site of Mahisgadi W/S Scheme at Barasat - II block, North 24 Pgs. district under Barasat Arsenic Division, PHE Dte. | ORD/000082/2021-2022 | 1732/B.Ar.D | 05/10/2021 | 30 | SUN ENTERPRISE | 4.77 | 4.66 | 100 | |||
| 750 | Barasat Arsenic Division | Repairing and Renovation of 02 (two) nos pump house and 01 (one) No I.E.P room, and allied works at the site of Bahira W/S Scheme at Barasat-II block, North 24 Pgs. district under Barasat Arsenic Division, PHE Dte. | ORD/000092/2021-2022 | 1829/B.Ar.D | 01/11/2021 | 30 | S. S. CONSULTANCY & CONSTRUCTION | 4.79 | 4.79 | 70 | |||
| 751 | Barasat Arsenic Division | Emergent protection of UPVC distribution pipe line at Choumuh more of Choumah W/S scheme at Barasat II under Barasat Arsenic Division, P.H.E. Dte. (Length - 70 mtr. Approx) | ORD/000093/2021-2022 | 1830/B.Ar.D | 01/11/2021 | 30 | IDEAL CONSTRUCTION | 4.79 | 4.79 | 1 | |||
| 752 | Barasat Arsenic Division | Withdrawing and Laying of UPVC Pipe Line in damaged portion of distribution network and protection work of UPVC line at Puturia -Kharbil of Puturia Water Supply Scheme under Barasat Arsenic Division, PHE Dte. | ORD/000096/2021-2022 | 1833/B.Ar.D | 01/11/2021 | 30 | M/S. BAKSHI ENTERPRISE | 4.78 | 4.73 | 1 | |||
| 753 | Barasat Arsenic Division | Providing Functional House Hold Tap Connection and allied works at Sondalia and Paltadanga Mouzas of Barasat- II Block from Paltadanga Ground Water Supply Scheme Under " Jal swapna" programme under Barasat Arsenic Division PHE, Dte. (Phase-I) | ORD/000122/2020-2021 | 126/B.Ar.D. | 20/01/2021 | 90 | BALAJEE ENTERPRISES | 86.87 | 168.00 | 1 | |||
| 754 | Barasat Arsenic Division | Providing Functional House Hold Tap Connection and allied works at Simulgachhi, Bonkanda and Baidyapur Mouzas of Barasat- II Block from Puturia Ground Water Supply Scheme Under " Jal swapna" programme under Barasat Arsenic Division PHE, Dte. (Phase-I). | ORD/000123/2020-2021 | 127/B.Ar.D. | 20/01/2021 | 90 | BANI ENGINEERING CO | 94.63 | 80.52 | 100 | |||
| 755 | Barasat Arsenic Division | Providing Functional House Hold Tap Connection and allied works at Jashaikati mouza of Baduria Block from Jashaikati ( Zone-I ) & Its Adjoining Mouzas Ground Water Supply Scheme Under '' JAL SWAPNA'' programme under Barasat Arsenic Division PHE, Dte. (Phase-II) | ORD/000123/2021-2022 | 2078/B.Ar.D. | 02/12/2021 | 90 | KINGS & CO. | 117.37 | 110.28 | 100 | |||
| 756 | Barasat Arsenic Division | Providing Functional House Hold Tap Connection and allied works at Bagband-Sarberia, Kirttipur and Krishnamati Mouzas of Barasat- II Block from Bagband Saiberia Ground Water Supply Scheme Under "Jal swapna" programme under Barasat Arsenic Division PHE, Dte. (Phase-I) | ORD/000124/2020-2021 | 128/B.Ar.D. | 20/01/2021 | 90 | R. K. MANDAL & CO. | 85.38 | 147.61 | 100 | |||
| 757 | Barasat Arsenic Division | Providing Functional Household Tap Connection (FHTC) and allied works Malrameswarpur, Kharigacchi, Chaturbhujpur and Kalikapur mouza of Barasat-II Block from Chowlpur & Its Adjoining Mouzas Ground Water Supply Scheme Under "JAL SWAPNA" programme under Barasat Arsenic Division, PHE Dte. Phase-II | ORD/000124/2021-2022 | 2077/B.Ar.D. | 02/12/2021 | 90 | BANERJEE CONSTRUCTION | 99.13 | 98.52 | 100 | |||
| 758 | Barasat Arsenic Division | Providing Functional House Hold Tap Connection and allied works at Mahishgadi Mouza of Barasat- II Block from Mahishgadi Ground Water Supply Scheme Under " Jal swapna" programme under Barasat Arsenic Division PHE, Dte. (Phase-I). | ORD/000125/2020-2021 | 134/B.Ar.D. | 21/01/2021 | 90 | BANI ENGINEERING CO | 96.59 | 136.24 | 1 | |||
| 759 | Barasat Arsenic Division | Providing Functional House Hold Tap Connection and allied works at Chakaminpur, Pakdaha and Balipur Mouzas of Barasat- II Block from Bahira Ground Water Supply Scheme Under "Jal swapna" programme under Barasat Arsenic Division PHE, Dte. (Phase-I). | ORD/000126/2020-2021 | 135/B.Ar.D. | 21/01/2021 | 90 | BANI ENGINEERING CO | 87.16 | 16.85 | 100 | |||
| 760 | Barasat Arsenic Division | Providing Functional House Hold Tap Connection and allied works at Atapur Mouza of Sandeshkhali-II Block from Atapur Ground Water Supply Scheme Under " Jal swapna" programme under Barasat Arsenic Division PHE, Dte. | ORD/000127/2020-2021 | 136/B.Ar.D. | 21/01/2021 | 90 | M/S NIRMAN CONSTRUCTION | 60.13 | 75.25 | 80 | |||
| 761 | Barasat Arsenic Division | Repairing and Renovation of 02 (two) nos pump house and 01 (one) No I.E.P room, and allied works at the site of Paltadanga W/S Scheme under Jal Swapna Programme at Barasat-II block, North 24 Pgs. district under Barasat Arsenic Division, PHE Dte. | ORD/000138/2021-2022 | 2218/B.Ar.D | 24/12/2021 | 30 | KUNDU CONSTRUCTION CO. | 4.79 | 4.78 | 1 | |||
| 762 | Barasat Arsenic Division | Road restoration due to laying of UPVC/HDPE Pipe line for providing FHTC of Tildanga Water Supply Scheme under Baduria Block under Barasat Arsenic Division, PHE Dte. (SM/07712) (Sl No. 1) | ORD/000138/2022-2023 | 2086/B.Ar.D. | 28/10/2022 | 15 | BALAJEE ENTERPRISES | 3.95 | 3.94 | 1 | |||
| 763 | Barasat Arsenic Division | Laying of HDPE Pipe Line in damaged portion of distribution network at Gobindapur under Bagband-Saiberia Water Supply Scheme under under Barasat Arsenic Division, PHE Dte. (SM/07709) (Sl No. 2) | ORD/000139/2022-2023 | 2087/B.Ar.D. | 28/10/2022 | 21 | BALAJEE ENTERPRISES | 4.20 | 4.20 | 1 | |||
| 764 | Barasat Arsenic Division | Repairing and Renovation of 02 (two) nos pump house and 01 (one) No I.E.P room, and allied works at the site of Chowlpur W/S Scheme under Jal Swapna Programme at Barasat-II block, North 24 Pgs. district under Barasat Arsenic Division, PHE Dte. | ORD/000140/2021-2022 | 2217/B.Ar.D | 24/12/2021 | 30 | CHOWDHURY CONSTRUCTION | 4.80 | 4.80 | 1 | |||
| 765 | Barasat Arsenic Division | Laying of UPVC Pipe Line at damaged portion of distribution network near Dadpur Gabtala Market of Bahira water supply scheme at Barasat-II Block due to construction of culvert and Drain under Barasat Arsenic Division, PHE Dte. under 'JAL JIBAN MISSION' Programme. (SM/07708) (Sl No. 3) | ORD/000140/2022-2023 | 2088/B.Ar.D. | 28/10/2022 | 21 | M/S DATTA ENTERPRISE | 4.93 | 4.92 | 1 | |||
| 766 | Barasat Arsenic Division | Laying UPVC Pipeline for Providing Functional Household Tap Connection of Command area at Puturia Ground Water Supply Scheme under Barasat - II Block under Barasat Arsenic Division PHE, Dte. (SM/08179) (Sl No. 4) | ORD/000141/2022-2023 | 2124/B.Ar.D. | 04/11/2022 | 15 | SAKTI ENTERPRISE | 2.63 | 2.63 | 1 | |||
| 767 | Barasat Arsenic Division | Laying of UPVC Pipe at khulnaghat of Dwarirjangal W/S scheme at Sandeshkhali Block- II for providing FHTC under " JAL JIBAN MISSION" under Barasat Arsenic Division, PHE Dte. (SM/08725) (Sl No. 5) | ORD/000142/2022-2023 | 2125/B.Ar.D. | 04/11/2022 | 21 | A P POWER AND CONCRETE | 4.83 | 4.83 | 1 | |||
| 768 | Barasat Arsenic Division | Emergent protection work of UPVC distribution pipe line near Chaumuha Chotopol (between Node 2-21) releted to the work of FHTC" of Chaumuha W/S scheme at Barasat - II under JALSWAPNA Programme under Barasat Arsenic Division, P.H.E. Dte. (Approx Lenth 70 mtr) | ORD/000148/2021-2022 | 2234/B.Ar.D | 28/12/2021 | 30 | A. K. DUTTA & CO. | 4.79 | 0.00 | 0 | |||
| 769 | Barasat Arsenic Division | Bullah Pilling for protection of Pipeline ( Approx 60 m) near pond of Sumon Haldar at Jasaikathi (Z-I) W/S Scheme at Baduria Block under Jal Swapna Programme under Barasat Arsenic Division, P.H.E. Dte. | ORD/000150/2021-2022 | 2232/B.Ar.D | 28/12/2021 | 30 | M/S DATTA ENTERPRISE | 4.45 | 4.44 | 100 | |||
| 770 | Barasat Arsenic Division | Laying of UPVC Pipe at damaged portion at Giri Para of Dwarir Jangal W/S scheme at Sandeshkhali Block- II for providing FHTC under Jalswapna Programme under Barasat Arsenic Division, PHE Dte. | ORD/000151/2021-2022 | 2233/B.Ar.D | 28/12/2021 | 30 | M/S L.P. CONSTRUCTION | 4.80 | 4.80 | 1 | |||
| 771 | Barasat Arsenic Division | Protection of UPVC Pipeline ( approx 50 m.) near Pond of Ajarul Gazi, Safikul Islam and near Ramkrishna Brick Field under Command area of Magurati Srirampur W/S Scheme of Baduria Block in Connection of Retrofiting work for providing FHTC under Barasat Arsenic Division, P.H.E. Dte. | ORD/000152/2020-2021 | 300/B.Ar.D | 03/02/2021 | 20 | NEW BRIGHT CONSTRUCTION | 3.99 | 0.00 | 1 | |||
| 772 | Barasat Arsenic Division | Laying of UPVC Pipe at damaged portion at Karnakhali of Dwarir Jangal W/S scheme at Sandeshkhali Block- II for providing FHTC under Jalswapna Programme under Barasat Arsenic Division, PHE Dte. | ORD/000153/2021-2022 | 2257/B.Ar.D | 30/12/2021 | 30 | A P POWER AND CONCRETE | 4.12 | 4.12 | 1 | |||
| 773 | Barasat Arsenic Division | Providing Functional House Hold Connection and Allied workas at Kismat sonatikari, Sonatikari, Dugdia and Bharparbara Malik Mouzas of Barasat II Block from Paltadanga & Its Adjoining Mouzas Ground Water Supply Scheme Under " Jal Swapna " Programme under Barasat Arsenic Division PHE, Dte. (Phase-II) | ORD/000169/2020-2021 | 465/B.Ar.D. | 19/02/2021 | 90 | BALAJEE ENTERPRISES | 60.68 | 118.18 | 1 | |||
| 774 | Barasat Arsenic Division | Providing Functional House Hold Connection and Allied workas at Gobindapur, Madanpur Krishnapur and Andulia Mouzas of Barasat II Block from Bagband Saiberia & Its Adjoining Mouzas Ground Water Supply Scheme Under " Jal Swapna " Programme under Barasat Arsenic Division PHE, Dte. (Phase-II) | ORD/000170/2020-2021 | 466/B.Ar.D. | 19/02/2021 | 90 | BALAJEE ENTERPRISES | 79.53 | 108.85 | 1 | |||
| 775 | Barasat Arsenic Division | Providing Functional House Hold Connection and Allied workas at Bahira and BhagyantpurMouzas of Barasat II Block from Bahira & Its Adjoining Mouzas Ground Water Supply Scheme Under " Jal Swapna " Programme under Barasat Arsenic Division PHE, Dte. (Phase-II) | ORD/000171/2020-2021 | 467/B.Ar.D. | 19/02/2021 | 90 | M/S JHARNA ENTERPRISE | 80.88 | 160.10 | 1 | |||
| 776 | Barasat Arsenic Division | Providing Functional House Hold Connection and Allied workas at puturia and Tona Mouzas of Barasat II Block from Puturia & Its Adjoining Mouzas Ground Water Supply Scheme Under " Jal Swapna " Programme under Barasat Arsenic Division PHE, Dte. (Phase-II) | ORD/000172/2020-2021 | 468/B.Ar.D. | 19/02/2021 | 90 | SAKTI ENTERPRISE | 75.31 | 47.31 | 100 | |||
| 777 | Barasat Arsenic Division | Providing Functional Household Tap Connection (FHTC) and allied works at left out portion of different Mouzas under command area of Chowlpur W/S scheme of Barasat - II blocks from Chowlpur and it adjoining mouzas ground water supply scheme under "JAL SWAPNA" programme under Barasat Arsenic Division, PHE Dte. (Phase - III). | ORD/000173/2021-2022 | 254/B.Ar.D. | 17/02/2022 | 90 | MAHMOOD ASSOCIATES PRIVATE LIMITED | 81.34 | 43.28 | 1 | |||
| 778 | Barasat Arsenic Division | Protection of UPVC distribution pipe line at 7 no. Sarder Para of Dwarir Jungle W/S scheme at Sandeshkhali- II under Barasat Arsenic Division, P.H.E. Dte. (Length - 60 mtr. Approx) | ORD/000174/2022-2023 | 2483/B.Ar.D. | 21/12/2022 | 20 | M/S ASHA ENGINEERING | 5.41 | 5.41 | 1 | |||
| 779 | Barasat Arsenic Division | Road restoration due to laying of various dia UPVC/HDPE Pipe distribution line at Kalikapur of Chowlpur W/S Scheme under Barasat -II block under Barasat Arsenic Division, PHE Dte. | ORD/000177/2022-2023 | 36/B.Ar.D | 05/01/2023 | 21 | P. & S. ASSOCIATES | 0.95 | 0.93 | 1 | |||
| 780 | Barasat Arsenic Division | Eucalyptus bullah pilling, drum sheet walling including earth filling (approx. 48 mtr length) for protection of different dia UPVC/HDPE Pipeline near pond of Sardarhati opposite Sardarhati Hari Mandir under Chowlpur W/S Scheme at Barasat- II block under JAL SWAPNA Programme under Barasat Arsenic Division, PHE Dte. | ORD/000178/2021-2022 | 265/B.Ar.D | 18/02/2022 | 20 | M/S DAS & CO | 4.71 | 0.00 | 0 | |||
| 781 | Barasat Arsenic Division | Repairing and Renovation of 02 ( two) nos Pump House and allied works at the site of Jasaikathi ( Zone-II ) W/S Scheme at Baduria block, North 24 Pgs. district under Barasat Arsenic Division, PHE Dte. | ORD/000179/2021-2022 | 266/B.Ar.D | 18/02/2022 | 20 | NEELAM ENTERPRISE | 4.72 | 4.72 | 1 | |||
| 782 | Barasat Arsenic Division | Providing Functional School , Anganwadi and Health Center Tap Connection and allied works of Command area at Bagband-Saiberia Ground Water Supply Scheme under Barasat-II Block Under '' JAL SWAPNA'' programme under Barasat Arsenic Division PHE, Dte. | ORD/000180/2021-2022 | 267/B.Ar.D | 18/02/2022 | 20 | A P POWER AND CONCRETE | 3.90 | 3.88 | 1 | |||
| 783 | Barasat Arsenic Division | Emergent protection of UPVC distribution pipe line near 2nd Pump House at PUTURIA W/S of Barasat II block under retrofitting of Puturia W/S for providing FHTC (Phase-I) under Barasat Arsenic Division, P.H.E. Dte. | ORD/000181/2021-2022 | 268/B.Ar.D | 18/02/2022 | 21 | BAKSHI ENTERPRISE | 4.47 | 4.48 | 1 | |||
| 784 | Barasat Arsenic Division | Eucalyptus bullah pilling, drum sheet walling including earth filling (approx. 50 mtr length) for protection of different dia UPVC/HDPE Pipeline near two ponds at Ghoradaria opposite Gour Biswas house and at Malrameswarpur Sardarhati opposite Pranab Sarkar house under Chowlpur W/S Scheme at Barasat- II block under JAL SWAPNA Programme under Barasat Arsenic Division, PHE Dte. | ORD/000184/2021-2022 | 288/B.Ar.D | 23/02/2022 | 20 | CHOWDHURY CONSTRUCTION | 4.80 | 4.26 | 1 | |||
| 785 | Barasat Arsenic Division | Repairing and Renovation of 02 ( two) nos Pump House and allied works at the site of Magurati Srirampur W/S Scheme at Baduria block, North 24 Pgs. district under Barasat Arsenic Division, PHE Dte. | ORD/000187/2021-2022 | 282/B.Ar.D | 22/02/2022 | 20 | NIKHIL SAMADDAR | 4.62 | 0.00 | 1 | |||
| 786 | Barasat Arsenic Division | Construction of pathway and allied works at the site of Bahira W/S Scheme under Jal Swapna Programme at Barasat-II block, North 24 Pgs. district under Barasat Arsenic Division, PHE Dte. | ORD/000189/2021-2022 | 277/B.Ar.D | 21/02/2022 | 20 | S. S. CONSULTANCY & CONSTRUCTION | 4.59 | 4.58 | 1 | |||
| 787 | Barasat Arsenic Division | Laying of UPVC Pipe Line from pump house no 1 towards Duchnekhali bazar for Functional House Hold Tap Connection under command area of Atapur water supply scheme of Sandeshkhali - II Block under JJM Programme under Barasat Arsenic Division, PHE Dte. | ORD/000189/2022-2023 | 470/B.Ar.D. | 27/02/2023 | 30 | P. & S. ASSOCIATES | 11.83 | 11.83 | 0 | |||
| 788 | Barasat Arsenic Division | Emergent protection of UPVC distribution pipe line near Haroa Khal from Dilip Mondal House to Kharibari Purba para of Mahisgadi W/S scheme related to the work FHTCat Barasat - II under Barasat Arsenic Division, P.H.E. Dte. (Approx. Length = 70 mtr) | ORD/000190/2021-2022 | 362/B.Ar.D | 03/03/2022 | 15 | M/S B. B. ENGINEERING | 4.80 | 4.80 | 1 | |||
| 789 | Barasat Arsenic Division | Emergent protection of UPVC distribution pipe line near dhokra (In between Node 44-45) of Chaumuha W/S scheme related to the work FHTCat Barasat - II under Barasat Arsenic Division, P.H.E. Dte. (Approx. Length = 70 mtr). | ORD/000191/2021-2022 | 363/B.Ar.D | 03/03/2022 | 15 | AT CONSTRUCTION | 4.79 | 4.79 | 1 | |||
| 790 | Barasat Arsenic Division | Providing Functional School, Anganwadi and Health Center Tap Connection and allied works of Command area at Chowlpur & others Ground Water Supply Scheme under Barasat-II Block Under '' JAL SWAPNA'' programme under Barasat Arsenic Division, PHE Dte. | ORD/000192/2021-2022 | 364/B.Ar.D | 03/03/2022 | 15 | SANTU GHOSH | 3.91 | 3.90 | 1 | |||
| 791 | Barasat Arsenic Division | Restoration due to laying of various dia UPVC/HDPE Pipe distribution line at Malrameswarpur mouza of Chowlpur W/S Scheme under Barasat -II block under Barasat Arsenic Division, PHE Dte. | ORD/000204/2023-2024 | 3030/B.Ar.D. | 29/12/2023 | 30 | SIRCON ENGINEERING SERVICES | 7.69 | 7.63 | 100 | |||
| 792 | Barasat Arsenic Division | Providing Functional House Hold Tap Connection and allied works at Chowlpur, Ghoradaria and Mitpukuria Mouzas of Barasat- II Block from Chowlpur Ground Water Supply Scheme under "Jal swapna" programme under Barasat Arsenic Division PHE, Dte. (Phase-I) | ORD/000216/2020-2021 | 561/B.Ar.D. | 26/02/2021 | 90 | SANJUKTA ENGINEERS | 77.59 | 107.62 | 1 | |||
| 793 | Barasat Arsenic Division | Providing Functional House Hold Tap Connection and allied works at Dakshindiara, Chak Khamarpur, Shrikati, Jagannathpur and Mahespur Mouzas of Baduria Block from Tildanga Ground Water Supply Scheme under " Jal swapna" programme under Barasat Arsenic Division PHE, Dte. (Phase-I). | ORD/000217/2020-2021 | 562/B.Ar.D. | 26/02/2021 | 90 | SANJUKTA ENGINEERS | 82.47 | 101.42 | 1 | |||
| 794 | Barasat Arsenic Division | Repairing & Renovation of damaged Ladder of OHR & allied works at Mahishgadi Water Supply Scheme under Barasat -II block under Barasat Arsenic Division, P.H.E. Dte. | ORD/000218/2021-2022 | 337/B.Ar.D | 28/02/2022 | 15 | BALAJEE ENTERPRISES | 4.63 | 0.00 | 1 | |||
| 795 | Barasat Arsenic Division | Repairing & Renovation of damaged Ladder of OHR & Allied works of Chowmuha Water Supply Scheme under Barasat -II block under Barasat Arsenic Division, P.H.E. Dte. | ORD/000219/2021-2022 | 338/B.Ar.D | 28/02/2022 | 15 | BALAJEE ENTERPRISES | 4.64 | 4.62 | 1 | |||
| 796 | Barasat Arsenic Division | Specials Repairing of Rising Main & Interconnection of 168.3 mm dia Ms pipe 250mm dia & 150 mm dia DI pipe at Bahira H/W Site under Bahira W/S Scheme at Barasat-II block under Barasat Arsenic Division, PHE Dte. under JAL SWAPNA Programme. | ORD/000220/2021-2022 | 339/B.Ar.D | 28/02/2022 | 15 | BANI ENGINEERING CO | 4.60 | 0.00 | 0 | |||
| 797 | Barasat Arsenic Division | Providing Functional School , Anganwadi and Health Center Tap Connection and allied works of Command area at Atapur, Dwarir Jungle & Jeliakhali Paschim Khanda Ground Water Supply Scheme under Sandeshkhali-II Block Under '' JAL SWAPNA'' programme under Barasat Arsenic Division, PHE Dte. | ORD/000223/2021-2022 | 341/B.Ar.D | 28/02/2022 | 15 | M/S.KRISHNA MONDAL | 3.97 | 0.00 | 0 | |||
| 798 | Barasat Arsenic Division | Balance portion work of repairing and renovation of 02 (two) nos pump house and 01 (one) no I.E.P room and allied works at the site of Chowma W/S Scheme at Barasat-II block, North 24 Pgs. district under Barasat Arsenic Division, PHE Dte. | ORD/000259/2021-2022 | 468/B.Ar.D | 16/03/2022 | 15 | SANTU GHOSH | 4.78 | 4.77 | 1 | |||
| 799 | Barasat Arsenic Division | Eucalyptus bullah pilling, drum sheet walling including earth filling for protection of different dia UPVC/HDPE Pipeline near pond of Asraf Ali at Srikati Sesher para under Tildanga W/S Scheme at Baduria block under JAL SWAPNA Programme under Barasat Arsenic Division, PHE Dte. | ORD/000263/2021-2022 | 473/B.Ar.D | 16/03/2022 | 15 | G. S. CONSTRUCTION & CO. | 4.45 | 4.44 | 1 | |||
| 800 | Barasat Arsenic Division | Eucalyptus bullah pilling, drum sheet walling including earth filling for protection of different dia UPVC/HDPE Pipeline near pond of Bablu Ali at Saiberia Uttarpara and Mosharef Ali at Saiberia Moral Para under Bagband Saiberia W/S Scheme at Barasat- II block under JAL SWAPNA Programme under Barasat Arsenic Division, PHE Dte. | ORD/000264/2021-2022 | 474/B.Ar.D | 16/03/2022 | 15 | WATERCOMP INDIA | 4.71 | 4.71 | 1 | |||
| 801 | Barasat Arsenic Division | Eucalyptus bullah pilling, drum sheet walling including earth filling for protection of different dia UPVC/HDPE Pipeline near pond of Jiyawal at Bokanda Majher Para under Puturia W/S Scheme at Barasat- II block under JAL SWAPNA Programme under Barasat Arsenic Division, PHE Dte. | ORD/000265/2021-2022 | 475/B.Ar.D | 16/03/2022 | 15 | CHAKRABORTY SUPPLIERS & CONSTRUCTION | 4.68 | 4.67 | 1 | |||
| 802 | Barasat Arsenic Division | Eucalyptus bullah pilling, drum sheet walling including earth filling for protection of different dia UPVC/HDPE Pipeline near pond of Fanindra Nath Karmakar and Kena Ghosh at Baghyabantapur under Bahira W/S Scheme at Barasat- II block under JAL SWAPNA Programme under Barasat Arsenic Division, PHE Dte. | ORD/000266/2021-2022 | 476/B.Ar.D | 16/03/2022 | 15 | SAHA ENTERPRISE | 4.73 | 4.72 | 1 | |||
| 803 | Barasat Arsenic Division | Eucalyptus bullah pilling, drum sheet walling including earth filling for protection of different dia UPVC/HDPE Pipeline near pond of Sumon Mondal under Jasaikathi - I W/S Scheme at Baduria block under JAL SWAPNA Programme under Barasat Arsenic Division, PHE Dte. | ORD/000267/2021-2022 | 477/B.Ar.D | 16/03/2022 | 15 | M/S DATTA ENTERPRISE | 4.47 | 4.46 | 100 | |||
| 804 | Barasat Arsenic Division | Laying of MS Pipe and allied work at Haroa Khal Crossing of Mahisgadi water supply Scheme and Boaring works related to FHTC works of Mahisgadi water supply Scheme at Barasat-II Block under Barasat Arsenic Division, PHE Dte. | ORD/000270/2021-2022 | 479/B.Ar.D | 16/03/2022 | 15 | BALAJEE ENTERPRISES | 4.77 | 4.76 | 1 | |||
| 805 | Barasat Arsenic Division | Eucalyptus bullah pilling, drum sheet walling including earth filling for protection of different dia UPVC/HDPE Pipeline near pond of Aribulla at Pagdha Dakshinpara under Bahira W/S Scheme at Barasat- II block under JAL SWAPNA Programme under Barasat Arsenic Division, PHE Dte. | ORD/000274/2021-2022 | 480/B.Ar.D | 16/03/2022 | 15 | DIPA CHHETRI | 4.59 | 4.59 | 1 | |||
| 806 | Barasat Arsenic Division | Eucalyptus bullah pilling, drum sheet walling including earth filling for protection of different dia UPVC/HDPE Pipeline near Najrul house and Hafijul house at Simulgachi under Puturia W/S Scheme at Barasat- II block under JAL SWAPNA Programme under Barasat Arsenic Division, PHE Dte. | ORD/000275/2021-2022 | 481/B.Ar.D | 16/03/2022 | 15 | M/S.KRISHNA MONDAL | 4.79 | 4.79 | 70 | |||
| 807 | Barasat Arsenic Division | Eucalyptus bullah pilling, drum sheet walling including earth filling for protection of different dia UPVC/HDPE Pipeline near pond of Mulluk Chand at danga uttarpara and Sumon Mondal at uttar chowdhury para under Jasaikathi - I W/S Scheme at Baduria block under JAL SWAPNA Programme under Barasat Arsenic Division, PHE Dte. | ORD/000276/2021-2022 | 482/B.Ar.D | 16/03/2022 | 15 | TEN STAR ENGINEERS CO-OPERATIVE SOCIETY LTD. | 4.58 | 4.58 | 1 | |||
| 808 | Barasat Arsenic Division | Eucalyptus bullah pilling, drum sheet walling including earth filling for protection of different dia UPVC/HDPE Pipeline near pond of Akbar Biswas and others at Hugle under Jasaikathi - II W/S Scheme at Baduria block under JAL SWAPNA Programme under Barasat Arsenic Division, PHE Dte. | ORD/000277/2021-2022 | 483/B.Ar.D | 16/03/2022 | 15 | RHINE CONSTRUCTION | 4.72 | 4.71 | 1 | |||
| 809 | Barasat Arsenic Division | Renovation of Pathway and Painting of boundary wall and other allied works at Chowlpur Head Work Site under Chowlpur Water Supply scheme of Barasat ll Block under JAL SWAPNA Programme under Barasat Arsenic Division, P.H.E. Dte. | ORD/000278/2021-2022 | 484/B.Ar.D | 16/03/2022 | 15 | MODERN CONSTRUCTIONS | 4.64 | 0.00 | 1 | |||
| 810 | Barasat Arsenic Division | Eucalyptus bullah pilling, drum sheet walling including earth filling (approx. 50 mtr length) for protection of different dia UPVC/HDPE Pipeline near two ponds at Ghoradaria opposite Ranjit Mandal house and at Malrameswarpur Sardarhati opposite Pradip Sarkar house under Chowlpur W/S Scheme at Barasat- II block under JAL SWAPNA Programme under Barasat Arsenic Division, PHE Dte. | ORD/000289/2021-2022 | 563/B.Ar.D | 23/03/2022 | 15 | NANDY UDYOG | 4.66 | 0.00 | 0 | |||
| 811 | Barasat Arsenic Division | Eucalyptus bullah pilling, drum sheet walling including earth filling for protection of different dia UPVC/HDPE Pipeline near pond of Srikrishna Sarkar at purbapara under Magurati Srirampur W/S Scheme at Baduria block under JAL SWAPNA Programme under Barasat Arsenic Division, PHE Dte. | ORD/000291/2021-2022 | 560/B.Ar.D | 23/03/2022 | 15 | A 8T CONSTRUCTION | 4.11 | 4.11 | 100 | |||
| 812 | Barasat Arsenic Division | Eucalyptus bullah pilling, drum sheet walling including earth filling for protection of different dia UPVC/HDPE Pipeline near pond of Ajibar Baidhya at Saiberia Baidhyapara and Akkaj Ali at saiberia Uttar para under Bagbandh Saiberia W/S Scheme at Barasat- II block under JAL SWAPNA Programme under Barasat Arsenic Division, PHE Dte. | ORD/000292/2021-2022 | 561/B.Ar.D | 23/03/2022 | 15 | KAKALI ENTERPRISE | 4.71 | 4.71 | 100 | |||
| Total | 49,627.61 | 25,602.32 | |||||||||||