| Sl No. | Division
Working Divisions
|
Sub Division
Working Divisions
|
Work Name
Name of the Work as per the Issued Work Order
|
Name of AE entrusted | Name of JE entrusted | System Order No.
System Order Number
|
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
|
WO Date
Date of Issuance of Work Order
|
Days of Completion
Target Days for Work Completion as per PHED-MIS
|
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
|
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
|
Payment
Amount of Payment made for this Work Order as per PHED-MIS
|
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
|
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1103 | 18,238.44 | 3,507.09 | |||||||||||
| 1 | Burdwan Division | Quotation of New connection charges at Augmentation of Mondalgram water supply scheme. [Application No.-5003701437] | BILL/00065/2023-2024 | 152/JJM | 26/05/2023 | 0 | WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LTD. | 0.64 | 0.00 | 0 | |||
| 2 | Burdwan Division | Hire & fuel charges of vehicle (Car No.-WB-37C-8293) for the office of the Assistant Engineer, Durgapur Sub-Division, PHE Dte. for the month of February'23. | BILL/00117/2023-2024 | 13/JJM | 17/04/2023 | 0 | SUJAUDDIN SEKH | 0.36 | 0.00 | 0 | |||
| 3 | Burdwan Division | Hire & fuel charges of vehicle (Car No.-WB-04G-7127) for the office of the Assistant Engineer, Kalna Sub-Division, PHE Dte. for the month of December22 to February'23. | BILL/00118/2023-2024 | 30/JJM | 19/04/2023 | 0 | PARTHA PRATIM ACHARYA | 1.19 | 0.00 | 0 | |||
| 4 | Burdwan Division | Quotation of new connection charges for Bhatar (Zone-I) water supply scheme. P.H. No.-4 | BILL/00132/2022-2023 | 942/JJM/22-23 | 09/01/2023 | 0 | WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LTD. | 3.67 | 0.00 | 0 | |||
| 5 | Burdwan Division | Hire & fuel charges of vehicle (Car No.-WB-41D-4561) for the office of the Assistant Engineer, Durgapur Sub-Division, PHE Dte. for the month of September & October'2022. | BILL/00142/2022-2023 | 823/VEH | 02/12/2022 | 0 | SUJAUDDIN SEKH | 0.73 | 0.00 | 0 | |||
| 6 | Burdwan Division | Hire & fuel charges of vehicle (Car No.-WB-04G-7127) for the office of the Assistant Engineer, Kalna Sub-Division, PHE Dte. for the month of March to September'2022. | BILL/00145/2022-2023 | 866/VEH | 09/12/2022 | 0 | PARTHA PRATIM ACHARYA | 2.79 | 0.00 | 0 | |||
| 7 | Burdwan Division | Quotation from WBSEDCL for load enhancement of Augmentation of Bhatar Zone-II (Kulnagar) w/s scheme for P.H.-6. | BILL/00173/2024-2025 | 1036/JJM | 25/10/2024 | 0 | WBSEDCL | 3.57 | 0.00 | 0 | |||
| 8 | Burdwan Division | Additional quotation for Untia PHE of Augmentation of Mondalgram water supply scheme.[Memo No.-SGA/ADDL/QUOTI, Dated-21/06/23] | BILL/00239/2023-2024 | 358/JJM | 14/07/2023 | 0 | WEST BENGAL BUILDING AND OTHER CONSTRUCTION WORKERS WELFARE FUND | 2.16 | 0.00 | 0 | |||
| 9 | Burdwan Division | Hire & fuel charges of vehicle (Car No.-WB-37C-8293) for the office of the Assistant Engineer, Durgapur Sub-Division, PHE Dte. for the month of November'2022. | BILL/00286/2022-2023 | 954/JJM/22-23 | 13/01/2023 | 0 | SUJAUDDIN SEKH | 0.38 | 0.00 | 0 | |||
| 10 | Burdwan Division | Hire & fuel charges of vehicle (Car No.-04G-7127) for the office of the Assistant Engineer, Kalna Sub-Division, PHE Dte. for the month of October & November'2022. | BILL/00288/2022-2023 | 956/JJM/22-23 | 13/01/2023 | 0 | PARTHA PRATIM ACHARYA | 0.77 | 0.00 | 0 | |||
| 11 | Burdwan Division | Hire & fuel charges of vehicle (Car No.-WB-04G-6018) for the office of the Assistant Engineer, Katwa Sub-Division, PHE Dte. for the month of March'23. | BILL/00290/2023-2024 | 204/JJM | 01/06/2023 | 0 | M/S MUNMUN DEY | 0.28 | 0.00 | 0 | |||
| 12 | Burdwan Division | Hire & fuel charges of vehicle (Car No.-WB-41J-6795) for the office of the Superintending Engineer, Central Circle, PHE Dte. for the month of January & February'23. | BILL/00292/2023-2024 | 218/JJM | 06/06/2023 | 0 | MD HASIN | 0.79 | 0.00 | 0 | |||
| 13 | Burdwan Division | Hire & fuel charges of vehicle (Car No.-WB-37C-8293) for the office of the Assistant Engineer, Durgapur Sub-Division, PHE Dte. for the month of April'23. | BILL/00293/2023-2024 | 203/JJM | 01/06/2023 | 0 | SUJAUDDIN SEKH | 0.40 | 0.00 | 0 | |||
| 14 | Burdwan Division | Hire & fuel charges of vehicle (Car No.-WB-41H-9788) for the office of the Assistant Engineer, Head Quarters, Burdwan Division, PHE Dte. for the month of March'23. | BILL/00296/2023-2024 | 201/JJM | 01/06/2023 | 0 | SK. ASRAFUDDIN | 0.39 | 0.00 | 0 | |||
| 15 | Burdwan Division | Quotation of Bhatar water supply scheme, Zone-II, PHE Dte. [Quotation No.-5003600235/Quot/03, dt.-10/02/2023] | BILL/00375/2022-2023 | 1168/JJM | 10/03/2023 | 0 | WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LTD. | 3.37 | 0.00 | 0 | |||
| 16 | Burdwan Division | Hire & fuel charges of vehicle (Car No.-WB-04G-7127) for the office of the Assistant Engineer, Kalna Sub-Division, PHE Dte. for the month of March & April'23. | BILL/00457/2023-2024 | 367/JJM | 18/07/2023 | 0 | PARTHA PRATIM ACHARYA | 0.77 | 0.00 | 0 | |||
| 17 | Burdwan Division | Hire & fuel charges of vehicle (Car No.-WB-41J-6795) for the office of the Deputy Superintending Engineer, Central Circle, PHE Dte. for the month of March to May'23. | BILL/00461/2023-2024 | 430/JJM | 25/07/2023 | 0 | MD HASIN | 1.04 | 0.00 | 0 | |||
| 18 | Burdwan Division | Hire & fuel charges of vehicle (Car No.-WB-41J-6795) for the office of the Deputy Superintending Engineer, Central Circle, PHE Dte. for the month of November & December'22. | BILL/00464/2022-2023 | 1131/JJM | 28/02/2023 | 0 | MD HASIN | 0.72 | 0.00 | 0 | |||
| 19 | Burdwan Division | Hire & fuel charges of vehicle (Car No.-WB-04G-6018) for the office of the Assistant Engineer, Katwa Sub-Division, PHE Dte. for the month of November & December'22. | BILL/00467/2022-2023 | 1048/JJM | 07/02/2023 | 0 | M/S MUNMUN DEY | 0.59 | 0.00 | 0 | |||
| 20 | Burdwan Division | Hire & fuel charges of vehicle (Car No.-WB-04G-6018) for the office of the Assistant Engineer, Katwa Sub-Division, PHE Dte. for the month of January'23. | BILL/00468/2022-2023 | 1118/JJM | 27/02/2023 | 0 | M/S MUNMUN DEY | 0.26 | 0.00 | 0 | |||
| 21 | Burdwan Division | Hire & fuel charges of vehicle (Car No.-WB-41G-2149) for the office of the Assistant Engineer, Burdwan Sub-Division, PHE Dte. for the month of February'23. | BILL/00565/2022-2023 | 1226/JJM | 20/03/2023 | 0 | SK.ASFIA | 0.40 | 0.00 | 0 | |||
| 22 | Burdwan Division | WBSEDCL quotation of Balgona piped water supply scheme under Burdwan Division, PHE Dte. [Ref. ID-503447092] | BILL/00612/2023-2024 | 713/JJM | 05/10/2023 | 0 | WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LTD. | 4.68 | 0.00 | 0 | |||
| 23 | Burdwan Division | Vehicle bill for the office of the Assistant Engineer, Durgapur Sub-Division, PHE Dte. for the month of May'23. | BILL/00614/2023-2024 | 562/JJM | 24/08/2023 | 0 | SUJAUDDIN SEKH | 0.40 | 0.00 | 0 | |||
| 24 | Burdwan Division | Vehicle bill for the office of the Assistant Engineer, Head Quarters Burdwan Division, PHE Dte. for the month of June'23. | BILL/00616/2023-2024 | 482/JJM | 09/08/2023 | 0 | SK. ASRAFUDDIN | 0.40 | 0.00 | 0 | |||
| 25 | Burdwan Division | Restoration work of Singerkone to Pandua Kulti road via badla from 0.00 km to 2.90 km, (in stretches) damaged due to laying of underground water pipe line by PHE with box cutting and Jhama with moorum consolidation under-Kalna Highvway Sub Division of Burdwan South Highway Division, P.W(Roads)Dte. during the year 2023-24. | BILL/00648/2024-2025 | 825/JJM | 13/09/2024 | 0 | EXECUTIVE ENGINEER BURDWAN SOUTH HIGHWAY DIVISION P.W. (ROADS) DTE. | 5.36 | 0.00 | 0 | |||
| 26 | Burdwan Division | Restoration of work due to laying of Water Supply Pipelines along Bonpass Village(Kamarpara) to Banpass Railway Station Road by Public Health Engineering Directorate under " Jal Jeevan Mission from 0.00 km to 1.54 km in the district of Purba Bardhaman under Burdwan Division,P.W.D." | BILL/00709/2024-2025 | 866/JJM | 23/09/2024 | 0 | EXECUTIVE ENGINEER PWD BURDWAN DIVISION | 2.94 | 0.00 | 0 | |||
| 27 | Burdwan Division | NAME OF THE WORK -RESTORATION WORK OF BIDYANAGAR TO VIA DAMODAR PARA TO BOGPUR ROAD,PACKAGE NO-WB-22-27,BLOCK-PURBASTHALI-1,GP-SRIRAMPUR & JAHANNAGAR. | BILL/00739/2024-2025 | 893/JJM | 25/09/2024 | 0 | EXECUTIVE ENGINEER (WBSRDA) PURBA BARDHAMAN DIVISION | 5.21 | 0.00 | 0 | |||
| 28 | Burdwan Division | MAINTENANCE OF ROAD (WHISH IS DAMAGED FOR LAYING PIPELINE BY PHE DEPTT) NAMELY NARUGRAM H.C TO BADSHI ROAD VIDE- PACKAGE NO- WB 22 12 UNDER PMGSY-III UNDER NARUGRAM GP. & RAINA-I BLOCK, IN PURBA BARDHAMAN DISTRICT | BILL/00740/2024-2025 | 894/JJM | 25/09/2024 | 0 | EXECUTIVE ENGINEER (WBSRDA) PURBA BARDHAMAN DIVISION | 3.86 | 0.00 | 0 | |||
| 29 | Burdwan Division | Regarding release of fund for restoration of road under PMGSY scheme under Ketugram-II Block Katwa Sub-Division PHE Dte. Khatundi to Chitahati (Package No-WB-22-47) | BILL/00772/2024-2025 | 896/JJM | 26/09/2024 | 0 | EXECUTIVE ENGINEER (WBSRDA) PURBA BARDHAMAN DIVISION | 2.45 | 0.00 | 0 | |||
| 30 | Burdwan Division | Hire & fuel charges of vehicle (Car No.-WB-04G-7127) for the month of May & June'23. | BILL/00791/2023-2024 | 632/JJM | 13/09/2023 | 0 | PARTHA PRATIM ACHARYA | 0.77 | 0.00 | 0 | |||
| 31 | Burdwan Division | Hire & fuel charges of vehicle (Car No.-WB-37C-8293) for the month of June & July'23. | BILL/00792/2023-2024 | 633/JJM | 13/09/2023 | 0 | SUJAUDDIN SEKH | 0.78 | 0.00 | 0 | |||
| 32 | Burdwan Division | Restoration work of Kalna baidyapur road from 7.90 km to 13.75 km (in stretches) damaged due to laying of underground water pipe line by PHE with box cutting and Jhama with moorum consolidation under Kalna Highway Sub-Division of Burdwan South Highway Division, P.W (Roads) Dte. during the year 2023-2024. | BILL/00890/2024-2025 | 1025/JJM | 05/10/2024 | 0 | EXECUTIVE ENGINEER BURDWAN SOUTH HIGHWAY DIVISION P.W. (ROADS) DTE. | 8.10 | 0.00 | 0 | |||
| 33 | Burdwan Division | Restoration work of Kulti Haritala to Jamna Bus stand via Krishnapur, Baharkuli,Sargoria road from 3.15 km to 5.70 km, damaged due to laying of underground water pipe line by PHE with box cutting and Jhama with moorum consolidation under Kalna Highway Sub Division of Burdwan South Highway Division, P.W(Roads) Dte. during the year 2023-24. | BILL/00891/2024-2025 | 1025/JJM | 05/10/2024 | 0 | EXECUTIVE ENGINEER BURDWAN SOUTH HIGHWAY DIVISION P.W. (ROADS) DTE. | 5.36 | 0.00 | 0 | |||
| 34 | Burdwan Division | Restoration of Nepakuli -Baghnapara road from 1.50 km to 2.50 km damaged due to laying of underground water pipe line by PHE with box cutting and Jhama moorum consolidation under Kalna Highway Sub-Division of Burdwan South Highway Division , P.W (Roads) Dte. during the year 2023-2024 | BILL/00892/2024-2025 | 1025/JJM | 05/10/2024 | 0 | EXECUTIVE ENGINEER BURDWAN SOUTH HIGHWAY DIVISION P.W. (ROADS) DTE. | 1.74 | 0.00 | 0 | |||
| 35 | Burdwan Division | Quotation from WBSEDCL for additional T/W at Jaggeswardihi w/s scheme under Burdwan Division, PHE Dte. | BILL/00895/2024-2025 | 1035/JJM | 25/10/2024 | 0 | WBSEDCL | 3.22 | 0.00 | 0 | |||
| 36 | Burdwan Division | Quotation from WBSEDCL for new service connection charges of Krishnabati w/s scheme under Burdwan Division, PHE Dte. (Application No.-5004422952)(Ref. ID-503758136) | BILL/00902/2024-2025 | 1048/JJM | 30/10/2024 | 0 | WBSEDCL | 7.08 | 0.00 | 0 | |||
| 37 | Burdwan Division | Hire & fuel charges of vehicle Car No.-WB-41J-6795 for the month of June & July2023. | BILL/01035/2023-2024 | 745/JJM | 11/10/2023 | 0 | MD HASIN | 0.79 | 0.00 | 0 | |||
| 38 | Burdwan Division | Hire & fuel charges of vehicle Car No.-WB-37C-8293 for the month of August'2023. | BILL/01036/2023-2024 | 746/JJM | 11/10/2023 | 0 | SUJAUDDIN SEKH | 0.39 | 0.00 | 0 | |||
| 39 | Burdwan Division | Hire & fuel charges of vehicle Car No.-wb-41H-9788 for the month of August'2023 | BILL/01037/2023-2024 | 747/JJM | 11/10/2023 | 0 | SK. ASRAFUDDIN | 0.40 | 0.00 | 0 | |||
| 40 | Burdwan Division | Hire & fuel charges of vehicle Car No.-WB-41G-8280 for the month of January to July'2023. | BILL/01042/2023-2024 | 852/JJM | 30/10/2023 | 0 | MD HASIN | 2.50 | 0.00 | 0 | |||
| 41 | Burdwan Division | Hire & fuel charges of vehicle Car No.-WB-04G-7127 for the month of July & August'2023. | BILL/01047/2023-2024 | 767/JJM | 12/10/2023 | 0 | PARTHA PRATIM ACHARYA | 0.78 | 0.00 | 0 | |||
| 42 | Burdwan Division | Quotation for new service connection charges at Nandai PWSS [PH No.-V][Ref ID-503434397] | BILL/01125/2023-2024 | 1086/JJM | 20/12/2023 | 0 | WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LTD. | 9.28 | 0.00 | 0 | |||
| 43 | Burdwan Division | Quotation of new service connection charges of Aug. of Bhatar (Zone-II) TW-6 water supply scheme under Burdwan Division, PHE Dte. | BILL/01338/2023-2024 | 1275/JJM | 18/01/2024 | 0 | WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LTD. | 9.53 | 0.00 | 0 | |||
| 44 | Burdwan Division | Vehicle bill for the month of October & November'2023. | BILL/01671/2023-2024 | 1145/JJM | 29/12/2023 | 0 | SOURAV JANA | 0.79 | 0.00 | 0 | |||
| 45 | Burdwan Division | Vehicle bill for the month of november'2023. | BILL/01672/2023-2024 | 1141/JJM | 29/12/2023 | 0 | SK.ASFIA | 0.40 | 0.00 | 0 | |||
| 46 | Burdwan Division | Vehicle bill for the month of november'2023. | BILL/01673/2023-2024 | 1140/JJM | 29/12/2023 | 0 | SK. ASRAFUDDIN | 0.40 | 0.00 | 0 | |||
| 47 | Burdwan Division | Vehicle bill for the month of November'23. | BILL/01674/2023-2024 | 1138/JJM | 29/12/2023 | 0 | SUJAUDDIN SEKH | 0.38 | 0.00 | 0 | |||
| 48 | Burdwan Division | Vehicle bill for the month of August & September'2023. | BILL/01675/2023-2024 | 1139/JJM | 29/12/2023 | 0 | MD HASIN | 0.77 | 0.00 | 0 | |||
| 49 | Burdwan Division | Vehicle bill for the month of September & October'2023. | BILL/01676/2023-2024 | 961/JJM | 01/12/2023 | 0 | SUJAUDDIN SEKH | 0.65 | 0.00 | 0 | |||
| 50 | Burdwan Division | Vehicle Bill (Car No.-WB-41H-9788) for the month of October'2023. | BILL/01677/2023-2024 | 1033/JJM | 11/12/2023 | 0 | SK. ASRAFUDDIN | 0.37 | 0.00 | 0 | |||
| 51 | Burdwan Division | Vehicle bill for the month of October'2023. | BILL/01678/2023-2024 | 1040/JJM | 11/12/2023 | 0 | SK.ASFIA | 0.38 | 0.00 | 0 | |||
| 52 | Burdwan Division | Vehicle bill (Car No.-WB-41H-3668) for the month of July to September'2023. | BILL/01679/2023-2024 | 1142/JJM | 29/12/2023 | 0 | MD HASIN | 0.86 | 0.00 | 0 | |||
| 53 | Burdwan Division | Vehicle bill (Car No.-WB-04G-7127) for the month of September'2023. | BILL/01680/2023-2024 | 1041/JJM | 11/12/2023 | 0 | PARTHA PRATIM ACHARYA | 0.39 | 0.00 | 0 | |||
| 54 | Burdwan Division | Vehicle bill [Car No.-WB-04G-6018] for the month of November & December'2023. | BILL/02053/2023-2024 | 1894/JJM | 28/03/2024 | 0 | M/S MUNMUN DEY | 0.45 | 0.00 | 0 | |||
| 55 | Burdwan Division | Vehicle bill [Car No.-WB-04G-6018] for the month of September & October'2023. | BILL/02056/2023-2024 | 1269/JJM | 16/01/2024 | 0 | M/S MUNMUN DEY | 0.49 | 0.00 | 0 | |||
| 56 | Burdwan Division | Vehicle bill [car No.-WB-04G-7127] for the month of October & November'2023. | BILL/02061/2023-2024 | 1321/JJM | 01/02/2024 | 0 | PARTHA PRATIM ACHARYA | 0.73 | 0.00 | 0 | |||
| 57 | Burdwan Division | Vehicle Bill [Car No.-WB-41H-9788] for the month of December'23. | BILL/02062/2023-2024 | 1322/JJM | 01/02/2024 | 0 | SK. ASRAFUDDIN | 0.40 | 0.00 | 0 | |||
| 58 | Burdwan Division | Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of NANDAI Piped Water Supply Scheme at opposite site of railway track at Malatipur, Nagargachhi, Mirjapur, Durgapur habitations, Kalna - I Block under Burdwan Division, PHE Dte. | ORD/000002/2022-2023 | 1869/BWD | 05/04/2022 | 30 | KOUSIK MALLICK | 51.64 | 0.00 | 1 | |||
| 59 | Burdwan Division | Shifting of pipeline for Strengthening work of Anandabazar-Galsi via Sar Road under Asansol Highway Division P.W. (Roads) [Node No- 6-7-8-9-10] and restore damage pipeline at Askaran village due to construction of drain by the Kurkuba GP of BAHIRGHANNYA and its adjoining mouza's Piped W/S Scheme at Galsi-II Block within Durgapur Sub Division under Burdwan Division, P.H.E. Dte. | ORD/000002/2023-2024 | 1604/BWD | 05/04/2023 | 84 | SUPRIYA RAY | 16.60 | 0.00 | 100 | |||
| 60 | Burdwan Division | Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of Kashipur Piped Water Supply Scheme at Sripur, (Sripur Habitation), Kashipur (Part) (Kashipur & Sahabganj Part Habitation) Village (Mouza), Bhatar Block under Burdwan Division, PHE Dte. | ORD/000003/2021-2022 | 3118/BWD | 02/06/2021 | 30 | PREMANANDA ROY BISWAS | 35.02 | 29.66 | 1 | |||
| 61 | Burdwan Division | Supply of 10 mm NB Gun-metal Ferrule conforming to IS: 2692-1989 for Water tap connection in each house hold from existing distribution system within Scheme jurisdiction in different Piped Water Supply Scheme within Kalna Sub-Division under Burdwan Division, PHE. Dte. and delivered at Borsul Divl. Store. [Part-4]. | ORD/000004/2021-2022 | 3117/BWD | 02/06/2021 | 30 | PREMANANDA ROY BISWAS | 76.65 | 76.65 | 0 | |||
| 62 | Burdwan Division | Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of Kamalnagar Surface Based Piped Water Supply Scheme at Ukhra, Dafarpota, Dampal, Mmudpur, Narayanpur, Nowapara, Patuli, Tegachhi & Gachha (9nos) Village (Mouza) under Kalna Sub Division, PHE Dte. | ORD/000006/2021-2022 | 3122/BWD | 02/06/2021 | 60 | SK ALIM | 212.45 | 53.87 | 1 | |||
| 63 | Burdwan Division | Providing Functional Household Tap Connection (FHTC) from existing distribution system with within the command area of augmentation BHALKI Piped Water Supply Scheme at Bhalki (Part), Chandipur (Part), Samantapara (Part), Telota (Part) & Abhirampuri (Part) village, habitation, Ausgram-II Block within Durgapur (Burdwan North) Sub Division under Burdwan Division, P.H.E. Dte. | ORD/000006/2022-2023 | 1907/BWD | 07/04/2022 | 30 | ROY CONSTRUCTION | 49.52 | 0.00 | 1 | |||
| 64 | Burdwan Division | Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of Amra Piped Water Supply Scheme at Amra (2 Nos Habitation Part) & Dogachia Village (Mouza), Jamalpur Block under Burdwan Division, PHE Dte._3rd CALL. | ORD/000008/2021-2022 | 3138/BWD | 03/06/2021 | 45 | D.M. ENTERPRISE | 57.42 | 20.77 | 1 | |||
| 65 | Burdwan Division | Extension of different dia UPVC Pipeline (suggested) as per survey of Horizon of Zone-III portion of Surface Based W/S Scheme in Arsenic Affected Areas of Purbasthali - II Block within Kalna Sub-Division under Burdwan Division, PHE Dte. | ORD/000009/2021-2022 | 3136/BWD | 03/06/2021 | 60 | ASHOK KUMAR GHOSH | 34.74 | 0.00 | 1 | |||
| 66 | Burdwan Division | Construction of Boundary wall at Head Works Site of TEANDUL Water Supply Scheme under RAINA I Block of Burdwan Division, PHE Dte. (Length -151.00 Mtr, Col - 48 Nos). | ORD/000012/2023-2024 | 1727/BWD | 13/04/2023 | 60 | HI-LIGHT ELECTRONICS | 21.94 | 0.00 | 100 | |||
| 67 | Burdwan Division | Providing FHTC in Chakundi, Nabastha & Saligram village for 100% coverage in Sajal Gram from existing distribution system within NABASTHA PWSS, Bardhhaman-II Development Block under Burdwan Division, PHE Dte. | ORD/000013/2023-2024 | 1728/BWD | 13/04/2023 | 30 | KAUSHIK RAY | 23.96 | 0.00 | 100 | |||
| 68 | Burdwan Division | Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of Bhatkunda Piped Water Supply Scheme at Bhatkunda (Part) Village (Adibasi Para, Bhatkunda (P), Boldanga Adibashipara habitation), Moukota (Part) Village (Adibashipara, Moukota (P) habitation), Parisha Village, Chaktilong Village, Ranngakhila Village (4Nos. habitations), Balarambati Village & Jijira Village (2 Nos. habitations) Ausgram - II Block under Burdwan Division, PHE Dte. | ORD/000015/2021-2022 | 3205/BWD | 09/06/2021 | 618 | ASHOK KUMAR GHOSH | 55.74 | 0.00 | 100 | |||
| 69 | Burdwan Division | Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of Kamalnagar Surface Based Piped Water Supply Scheme at Sajiara, Simla, Barapara, Bodhsah, Dubrajpur, Gobindapur, Isabpur, Kaibati, Khord Kaibati, Kubajpur, Kuksimla, Muksimpara, Sanghoshpara, Sumuria & Chhatni (15nos) Village (Mouza) under Kalna Sub Division, PHE Dte. | ORD/000016/2021-2022 | 3230/BWD | 10/06/2021 | 60 | UNICON INDIA | 223.63 | 42.56 | 1 | |||
| 70 | Burdwan Division | Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of Bhatar Piped Water Supply Scheme at Kapshar, Bamsor & Belenda (3nos) Village (Mouza) under Burwan Division, PHE Dte. | ORD/000017/2021-2022 | 3301/BWD | 15/06/2021 | 60 | SUPER CO. OPERATIVE LABOUR CONTRACT AND CONSTRUCTION SOCIETY LTD. | 141.14 | 0.00 | 1 | |||
| 71 | Burdwan Division | Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of Bhatar Piped Water Supply Scheme at Bhatar, Kantar, Kulchanda, Kulnagar, Palar, Satkhali & Chandipur (7nos) Village (Mouza) under Burwan Division, PHE Dte. | ORD/000018/2021-2022 | 3300/BWD | 15/06/2021 | 60 | SUPER CO. OPERATIVE LABOUR CONTRACT AND CONSTRUCTION SOCIETY LTD. | 143.17 | 87.73 | 1 | |||
| 72 | Burdwan Division | Arrangement of drinking water supply by installation of solar submersible pump including sinking of 200 mm. dia. Tube well 150 Mtr. Deep by direct rotary rig method, Laying dist. System, FHTC and 2 Nos. 5000 Ltr. PVC tank installation with construction of RCC structure for BHAGABATITALA Habitation which is uncovered of MANIKHAR Piped W/S. Scheme, Block KALNA-1 under Burdwan Division, PHE Dte. | ORD/000018/2025-2026 | 1245/BWD | 23/04/2025 | 45 | A.R. TRADERS | 30.74 | 0.00 | 75 | |||
| 73 | Burdwan Division | Sheet piling and others ancillary works to protect errosion of river bank protection area at raw water intake point of Kamalnagar WTP under Burdwan Division PHE Dte. | ORD/000021/2022-2023 | 2015/BWD | 18/04/2022 | 45 | CONCORD ENGINEERING | 122.20 | 0.00 | 1 | |||
| 74 | Burdwan Division | Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of Siptai Piped Water Supply Scheme at Shrimanpur Village, Siptai Village, Ilampur Village, Prijpur Village & Gohaldaha Village, Jamalpur Block under Burdwan Division, PHE Dte. | ORD/000024/2021-2022 | 3342/BWD | 21/06/2021 | 45 | ASHOK KUMAR GHOSH | 41.90 | 40.42 | 1 | |||
| 75 | Burdwan Division | Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of Augmentation of MANKAR Piped Water Supply Scheme at Mankar Palpara, Galsi-I Block within Durgapur (Burdwan North) Sub Division under Burdwan Division, P.H.E. Dte. [SL-05] | ORD/000025/2023-2024 | 153/DSD | 13/04/2023 | 21 | SOUMYAVASH DAS | 0.95 | 0.00 | 100 | |||
| 76 | Burdwan Division | Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of Kamalnagar Surface Based Piped Water Supply Scheme at Majida, Rukuspur, Uttar Lakshmipur, Candipur, Gopipur, Kuturia & Mertala (7nos) Village (Mouza) under Kalna Sub Division, PHE Dte. | ORD/000027/2021-2022 | 3393/BWD | 24/06/2021 | 60 | SATYANARAYAN ENGINEERS CO. OP. SOCIETY LTD. | 219.81 | 88.33 | 1 | |||
| 77 | Burdwan Division | Continuation work order for Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Jargram (Part) village (Jargram (P) habitation) of Madhabpur Piped Water Supply Scheme within Burdwan Sub-Divn. under Burdwan Division, PHE. Dte. [SL. No. : 05] | ORD/000027/2022-2023 | 2058/BWD | 19/04/2022 | 15 | LAKSHMIKANTA DAS | 4.86 | 0.00 | 1 | |||
| 78 | Burdwan Division | Work Order for "Providing Functional house hold tap connections for Sajal Gram Village within Purbasthali-II Block under Kalna Sub-Division under Burdwan Division, PHE Dte. (Purbasthali Aug & Kamalnagar water supply scheme)" | ORD/000027/2023-2024 | 346/KSD | 17/04/2023 | 30 | RAJESH DAFADAR | 0.88 | 0.00 | 100 | |||
| 79 | Burdwan Division | Re-Laying of U-PVC (Damaged by Irrigation Department) pipeline near Uttar Mahanpur to Dakhin Mahanpur under ANTPARA PWSS, Jamalpur Dev. Block under Burdwan Division, PHE Dte. | ORD/000027/2025-2026 | 1299/BWD | 28/04/2025 | 90 | GOUTAM KUMAR MITRA | 9.64 | 0.00 | 0 | |||
| 80 | Burdwan Division | Continuation work order for Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Bhada village of Kayrapur Piped Water Supply Scheme within Durgapur Sub-Divn. under Burdwan Division, PHE. Dte.. [SL. No. : 20] | ORD/000028/2021-2022 | 3399/BWD | 24/06/2021 | 15 | M/S S. CHOUDHURY | 4.86 | 0.00 | 1 | |||
| 81 | Burdwan Division | Providing Functional Household Tap Connection (FHTC) at balance portion from existing distribution system within the command area of Aug. of PURBASTHALI Piped Water Supply Scheme at Chupi village (Mouza), Purbasthali - II Block under Burdwan Division, PHE Dte. | ORD/000028/2022-2023 | 2079/BWD | 20/04/2022 | 30 | M/S K.P. CONSTRUCTION | 39.64 | 0.00 | 100 | |||
| 82 | Burdwan Division | Work Order for "Providing Functional house hold tap connections for Sajal Gram Village within Monteswar Block under Kalna Sub-Division under Burdwan Division, PHE Dte. (Putsuri water supply scheme)" | ORD/000028/2023-2024 | 344/KSD | 17/04/2023 | 30 | HASAN CONSTRUCTION | 0.88 | 0.00 | 0 | |||
| 83 | Burdwan Division | Continuation work order for Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Kayrapur village of Kayrapur Piped Water Supply Scheme within Durgapur Sub-Divn. under Burdwan Division, PHE. Dte. [SL. No. : 19] | ORD/000029/2021-2022 | 3398/BWD | 24/06/2021 | 15 | M/S S. CHOUDHURY | 4.86 | 0.00 | 1 | |||
| 84 | Burdwan Division | Work Order for "Providing Functional house hold tap connections for Sajal Gram villages within Monteswar Block under Kalna Sub-Division under Burdwan Division, PHE Dte. (Putsuri water supply Scheme) (Sl No-9) | ORD/000029/2023-2024 | 344/KSD | 17/04/2023 | 30 | HASAN CONSTRUCTION | 0.88 | 0.00 | 0 | |||
| 85 | Burdwan Division | Providing FHTC of distribution pipe line at Nari village(Habitation-Sutradharpara,Adibasipara & Suriyapally)for RAYAN Water Supply Scheme at Bardhhaman-I Development Block under Burdwan Division,PHE Dte.Gr.A | ORD/000030/2022-2023 | 677/BSD | 22/04/2022 | 30 | BRINDABAN KONAR | 2.68 | 0.00 | 1 | |||
| 86 | Burdwan Division | Restoration of village Road dismantled by laying pipeline for providing FHTC at Amarargarh Ankurepara, Bonpara & Sahapara of AMARARGARH Piped Water Supply Scheme [Rectrofitting] under Ausgram-II Block within Durgapur (Burdwan North) Sub Division under Burdwan Division, P.H.E. Dte. [SL-06] | ORD/000030/2023-2024 | 154/DSD | 13/04/2023 | 637 | SAIKAT RAY | 0.97 | 0.00 | 100 | |||
| 87 | Burdwan Division | Continuation work order for Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Jougram village (Jougram habitation) of Jougram Piped Water Supply Scheme within Burdwan Sub-Divn. under Burdwan Division, PHE. Dte. (Part-C) [SL. No. : 11] | ORD/000031/2021-2022 | 3408/BWD | 25/06/2021 | 15 | N.S. ENTERPRISE | 4.86 | 4.27 | 1 | |||
| 88 | Burdwan Division | Restoration of village Road dismantled by laying pipeline for providing FHTC at Amarargarh Dakshinpara of AMARARGARH Piped Water Supply Scheme [Retrofitting] under Ausgram-II Block within Durgapur (Burdwan North) Sub Division under Burdwan Division, P.H.E. Dte.[SL-07] | ORD/000031/2023-2024 | 155/DSD | 13/04/2023 | 21 | RAM MOHAN MUKHERJEE | 0.97 | 0.00 | 100 | |||
| 89 | Burdwan Division | Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of Kamalnagar Surface Based Piped Water Supply Scheme at Harispur, Hatsiuri, Jajneswarpur, Jamalpur, Madhupur, Nakadaha, Nimdaha, Palasberia & Sarangpur (9nos) Village (Mouza) under Kalna Sub Division, PHE Dte. | ORD/000032/2021-2022 | 3417/BWD | 25/06/2021 | 60 | ASHOK KUMAR GHOSH | 230.37 | 82.01 | 1 | |||
| 90 | Burdwan Division | Extension of pipeline with FHTC for CHHOTOBAINAN Piped Water Supply Scheme (Akina (P), Pahalanpur, Dakshin Gopalpur, Bajekumarpur, Binodpur, Momrejpur village) within Raina II Block under Burdwan Division, PHE. Dte. | ORD/000032/2022-2023 | 2163/BWD | 26/04/2022 | 45 | BRINDABAN KONAR | 71.69 | 0.00 | 1 | |||
| 91 | Burdwan Division | Restoration of village Road dismantled by laying pipeline for providing FHTC at Amarargarh Mandalpara of AMARARGARH Piped Water Supply Scheme [Retrofitting] under Ausgram-II Block within Durgapur (Burdwan North) Sub Division under Burdwan Division, P.H.E. Dte. [SL-08] | ORD/000032/2023-2024 | 156/DSD | 13/04/2023 | 21 | PARTHA RAY | 0.96 | 0.00 | 100 | |||
| 92 | Burdwan Division | Work Order for Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of Kamalnagar Surface Based Piped Water Supply Scheme at Hapania, Kankhal, Khar Dattapara, Pathangram, Sontoshpur Pila & Uttar Srirampur (6nos) Village (Mouza) under Kalna Sub Division, PHE Dte. | ORD/000033/2021-2022 | 3416/BWD | 25/06/2021 | 60 | M/S ASHA CONSTRUCTION | 146.22 | 0.00 | 1 | |||
| 93 | Burdwan Division | Providing left out FHTC for making Swajal Gram at Khanhati village within Adra Water supply Scheme in Galsi-II Block under Burdwan Division, P.H.E. Dte.[SL-09] | ORD/000033/2023-2024 | 157/DSD | 13/04/2023 | 21 | SHUBHRA KANTI GHOSH | 0.97 | 0.00 | 100 | |||
| 94 | Burdwan Division | Continuation work order for Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Bagila village (Bagila habitation) of Bagila Piped Water Supply Scheme within Burdwan Sub-Divn. under Burdwan Division, PHE. Dte. (Part - A) [SL. No. : 08] | ORD/000034/2021-2022 | 3406/BWD | 25/06/2021 | 15 | PAL CONSTRUCTION | 4.86 | 4.86 | 0 | |||
| 95 | Burdwan Division | Providing Functional Household Tap Connection (FHTC) at Antpara village within the command area of ANTPARA Piped Water Supply Scheme at Jamalpur Block under Burdwan Division, PHE Dte. [Group : A] | ORD/000034/2022-2023 | 240/AE/HQ | 20/04/2022 | 30 | N.S. ENTERPRISE | 4.77 | 0.00 | 1 | |||
| 96 | Burdwan Division | Continuation work order for Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Uttar Rameswarpur village of Nandai Piped Water Supply Scheme within Kalna Sub-Divn. under Burdwan Division, PHE. Dte. [Phase - I] [Sl.No : 4B] | ORD/000035/2021-2022 | 3409/BWD | 25/06/2021 | 30 | AURGHA BHATTACHARYA | 4.92 | 0.00 | 1 | |||
| 97 | Burdwan Division | Construction of Retaining wall for protection of soil erosion at Headwork site (Western Side) at TEANDUL Piped Water Supply Scheme under Burdwan Division, PHE Dte. [Group : B] | ORD/000035/2022-2023 | 241/AE/HQ | 20/04/2022 | 30 | ROY CONSTRUCTION | 4.82 | 0.00 | 1 | |||
| 98 | Burdwan Division | Restoration of damaged pipeline of distribution main for construction of drain at Billwagram village within Kayrapur W/S Scheme (Part-B) in Ausgram-I Block under Burdwan Division, P.H.E. Dte.[SL-11] | ORD/000035/2023-2024 | 159/DSD | 13/04/2023 | 21 | SANDIPAN SENGUPTA | 0.52 | 0.00 | 100 | |||
| 99 | Burdwan Division | Laying of uPVC pipe for providing FHTC at Baratikra Village within ANTPARA Piped Water Supply Scheme, Jamalpur Block under Burdwan Division P.H.E Dte. [Group : C] | ORD/000036/2022-2023 | 242/AE/HQ | 20/04/2022 | 30 | J. K. CORPORATION | 4.58 | 0.00 | 1 | |||
| 100 | Burdwan Division | Restoration and relaying of damaged pipeline of distribution main for construction of drain, concrete road etc at Ruidaspara (South end) of Adra village for providing left out FHTC at Ruidaspara (South end) within Adra W/S Scheme in Galsi-II Block under Burdwan Division, P.H.E. Dte.[SL-12] | ORD/000036/2023-2024 | 160/DSD | 13/04/2023 | 21 | SHUBHRA KANTI GHOSH | 0.96 | 0.00 | 100 | |||
| 101 | Burdwan Division | Work Order for Providing Functional Household Tap Connection(FHTC) from existing distribution system within the command area of Kamalnagar Surface Based Piped Water Supply Scheme at Muragachha, Sardanga, Sihipara, Bagachra, Baragachhi, Belgachhi, Kumirpara, Lohachur, Atpara, Barea, Dhamas, Kamalapur & Kamalnagar (13nos) Village (Mouza) under Kalna Sub Division, PHE Dte. | ORD/000037/2021-2022 | 3418/BWD | 25/06/2021 | 60 | MRITYUNJOY MUKHERJEE & CO. | 232.13 | 80.59 | 1 | |||
| 102 | Burdwan Division | Work order for " Providing Functional house hold tap connections for Sajal Gram Village within Kalna-II Block under Kalna Sub-Division under Burdwan Division, PHE Dte. (Tehata Water Supply Scheme)" | ORD/000037/2023-2024 | 345/KSD | 17/04/2023 | 30 | ARINDAM BHATTACHARYA | 0.88 | 0.00 | 100 | |||
| 103 | Burdwan Division | Formal Work Order for Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of Barwa Piped Water Supply Scheme at Berwa (2 Nos Habitation Part), Mutra (2 Nos Habitation Part), Baneswarpur & Senpur (4 Nos Habitation) Village (Mouza), Memari-II Block under Burdwan Division, PHE Dte. | ORD/000038/2021-2022 | 3442/BWD | 28/06/2021 | 90 | KALYAN CHOWDHURY | 45.14 | 17.46 | 100 | |||
| 104 | Burdwan Division | Construction of concrete path way at Head Work Site & 2nd & 3rd Tube Well site along with plinth protection of Pump House No-I & laying of 200 mm dia DI Pipe for wash out and over flow drain of existing OHR of Putsuri W/S Scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. | ORD/000038/2022-2023 | 2218/BWD | 28/04/2022 | 30 | BISHWAJIT DAS | 4.07 | 0.00 | 0 | |||
| 105 | Burdwan Division | Extension of HDPE pipeline for Providing Functional Household Tap Connection at Amarpur Habitation of SIALI Piped Water Supply Scheme under Burdwan Division,P.H.E.Dte. [Group : E] | ORD/000039/2022-2023 | 244/AE/HQ | 20/04/2022 | 30 | BOSE ENTERPRISE | 4.11 | 0.00 | 1 | |||
| 106 | Burdwan Division | Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of Nabastha Piped Water Supply Scheme at Saligram (9 Nos Habitation) Village (Mouza), Burdwan-II Block under Burdwan Division, PHE Dte. | ORD/000040/2021-2022 | 3447/BWD | 29/06/2021 | 30 | PAL CONSTRUCTION | 19.73 | 0.00 | 1 | |||
| 107 | Burdwan Division | Providing Functional Household Tap Connection (FHTC) at Parbatpur village within the command area of MAHINDAR Piped Water Supply Scheme at Jamalpur Block under Burdwan Division, PHE Dte. [Group : A] | ORD/000040/2022-2023 | 227/AE/HQ | 19/04/2022 | 30 | M/S S. CHOUDHURY | 4.78 | 0.00 | 1 | |||
| 108 | Burdwan Division | Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of Ruppur Piped Water Supply Scheme at Ruppur Village (6 Nos. habitations), Biswambharpur Village & Dhuluk Village (6 Nos. habitations) Jamalpur Block under Burdwan Division, PHE Dte. | ORD/000041/2021-2022 | 3446/BWD | 29/06/2021 | 60 | NATIONAL CONSTRUCTION | 87.06 | 0.00 | 1 | |||
| 109 | Burdwan Division | Providing Functional Household Tap Connection (FHTC) at Basantaput and Paratal village within the command area of HIRANYAGRAM Piped Water Supply Scheme at Jamalpur Block under Burdwan Division, PHE Dte. [Group : B] | ORD/000041/2022-2023 | 228/AE/HQ | 19/04/2022 | 30 | M/S UNIQUE | 4.77 | 0.00 | 1 | |||
| 110 | Burdwan Division | Continuation work order for Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Bagila village (Bagila habitation) of Bagila Piped Water Supply Scheme within Burdwan Sub-Divn. under Burdwan Division, PHE. Dte. (Part - B) [SL. No. : 09] | ORD/000042/2021-2022 | 3465/BWD | 29/06/2021 | 15 | HAMID SK | 4.87 | 4.87 | 0 | |||
| 111 | Burdwan Division | Realignment and culvert crossing of D.I. pipeline at damaged section and repairing of uPVC pipeline at Nandanpur, Keunta and Rampur village within Keunta Piped Water Supply Scheme, Raina ¿ II Block under Burdwan Division, PHE. Dte. [Group : D] | ORD/000043/2022-2023 | 236/AE/HQ | 19/04/2022 | 30 | SUPER SKILL | 4.61 | 0.00 | 1 | |||
| 112 | Burdwan Division | Construction of switch room cum chlorine room without toilet room at 4th Tube well site according to departmental drawing no.- PHE/BD/P.H/DRG-01/DCE-2017 for Bagila piped water supply scheme at Sanghatipally under Memari-I Block under Burdwan Sub-Division, PHE Dte within Burdwan Division PHE Dte. Dist- Purba Bardhaman. | ORD/000043/2025-2026 | 1025/BSD | 08/05/2025 | 90 | H SAMANTA | 4.16 | 0.00 | 100 | |||
| 113 | Burdwan Division | Laying of uPVC pipe for providing FHTC at Kanshra Village within KANSHRA Piped Water Supply Scheme, Jamalpur Block under Burdwan Division P.H.E Dte. [Group : A] | ORD/000045/2022-2023 | 199/AE/HQ | 06/04/2022 | 30 | DEBASHISH ENTERPRISE | 4.84 | 0.00 | 1 | |||
| 114 | Burdwan Division | Relaying of pipe line damaged by Construction of Community Centre & construction of road / drain etc. at different location of TAKIPUR and its adjoining mouza's Piped W/S Scheme at Ausgram-I Block within Durgapur Sub Division under Burdwan Division, P.H.E. Dte.[SL-08] | ORD/000046/2023-2024 | 174/DSD | 18/04/2023 | 21 | TARAMA AGENCY | 0.91 | 0.00 | 100 | |||
| 115 | Burdwan Division | Providing Functional Household Tap Connection (FHTC) at Paratal village within the command area of HIRANYAGRAM Piped Water Supply Scheme at Jamalpur Block under Burdwan Division, PHE Dte. [Group : C] | ORD/000047/2022-2023 | 201/AE/HQ | 06/04/2022 | 30 | M/S SAYAN CHAKRABORTY | 4.85 | 0.00 | 1 | |||
| 116 | Burdwan Division | Relaying of pipe line damaged by Construction of Health Centre & construction of road / drain etc. at different location of TAKIPUR and its adjoining mouza's Piped W/S Scheme at Ausgram-I Block within Durgapur Sub Division under Burdwan Division, P.H.E. Dte.[SL-9] | ORD/000047/2023-2024 | 175/DSD | 18/04/2023 | 21 | TARAMA AGENCY | 0.77 | 0.00 | 100 | |||
| 117 | Burdwan Division | Providing Functional Household Tap Connection (FHTC) at Mahindar village within the command area of MAHINDAR Piped Water Supply Scheme at Jamalpur Block under Burdwan Division, PHE Dte. [Group : E] | ORD/000049/2022-2023 | 203/AE/HQ | 06/04/2022 | 30 | M/S ASHA CONSTRUCTION | 4.85 | 0.00 | 1 | |||
| 118 | Burdwan Division | Laying of HDPE pipeline at Sonargoria and Kubajur village for providing FHTC within Shura PWSS (Zone-II), Block-Jamalpur under Burdwan Division, PHE Dte._2ND CALL [Group : F] | ORD/000050/2022-2023 | 204/AE/HQ | 06/04/2022 | 30 | M/S UNIT CONSTRUCTION | 4.81 | 0.00 | 1 | |||
| 119 | Burdwan Division | Construction of approach road to get to the Head works site of MAHINDAR Piped Water Supply Scheme, Jamalpur Block under Burdwan Division P.H.E Dte._2ND CALL [Group : G] | ORD/000051/2022-2023 | 205/AE/HQ | 06/04/2022 | 30 | APORUPA CONSTRUCTION | 4.84 | 0.00 | 100 | |||
| 120 | Burdwan Division | Construction of boundary wall at Pump house no - 3 Site of Hatgobindapur Water Supply Scheme under Bardhaman-II Dev. Block of Burdwan Division, PHE Dte. (Length -40.00 Mtr, Col-16 Nos). Group : B | ORD/000052/2022-2023 | 701/BSD | 27/04/2022 | 45 | ANIRUDDHA FARUQUE | 2.61 | 0.00 | 1 | |||
| 121 | Burdwan Division | Providing Functional Household Tap Connection (FHTC) from existing distribution system with within the command area of Augmentation of MANKAR Piped Water Supply Scheme at backside of Mankar Girls School, Galsi-I Block within Durgapur (Burdwan North) Sub Division under Burdwan Division, P.H.E. Dte.[SL-01] | ORD/000052/2023-2024 | 176/DSD | 18/04/2023 | 21 | SHUBHRA KANTI GHOSH | 0.95 | 0.00 | 95 | |||
| 122 | Burdwan Division | Providing Functional Household Tap Connection (FHTC) from existing distribution system with within the command area of Augmentation of MANKAR Piped Water Supply Scheme at Mankar Nayekpara, Galsi-I Block within Durgapur (Burdwan North) Sub Division under Burdwan Division, P.H.E. Dte.[SL-02] | ORD/000053/2023-2024 | 177/DSD | 18/04/2023 | 21 | SOUMYAVASH DAS | 0.96 | 0.00 | 100 | |||
| 123 | Burdwan Division | Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of HATGOBINDAPUR Piped Water Supply Scheme and its adjoining mouzas at Burdwan - II Block under Burdwan Division, PHE. Dte. | ORD/000054/2022-2023 | 2232/BWD | 29/04/2022 | 30 | M/S ASHA CONSTRUCTION | 19.32 | 0.00 | 1 | |||
| 124 | Burdwan Division | Sinking of additional 250 X 200mm dia Tube Well 150 mtr. Depth by D.R. Rig method using UPVC pipe (CD) and UPVC Deep Well Screen (RDS) for CHHOTOBAINAN Piped Water Supply Scheme, Block - Raina - II, Dist - Purba Bardhaman under Burdwan Division, PHE Dte. | ORD/000055/2022-2023 | 2233/BWD | 29/04/2022 | 30 | J. K. CORPORATION | 10.76 | 0.00 | 1 | |||
| 125 | Burdwan Division | Extension of Pipeline for Providing Functional Household Tap Connection (FHTC) within the command area of Augmentation of MANKAR Piped Water Supply Scheme Near Mankar Masjitala, Galsi-I Block within Durgapur (Burdwan North) Sub Division under Burdwan Division, P.H.E. Dte.[SL-03] | ORD/000055/2023-2024 | 178/DSD | 18/04/2023 | 21 | SOUMYAVASH DAS | 0.96 | 0.00 | 100 | |||
| 126 | Burdwan Division | Extension of Pipeline for Providing Functional Household Tap Connection (FHTC) within the command area of Augmentation of MANKAR Piped Water Supply Scheme at back side of Mankar Girls School, Galsi-I Block within Durgapur (Burdwan North) Sub Division under Burdwan Division, P.H.E. Dte.[SL-04] | ORD/000056/2023-2024 | 179/DSD | 18/04/2023 | 21 | SHUBHRA KANTI GHOSH | 0.96 | 0.00 | 100 | |||
| 127 | Burdwan Division | Construction of boundary wall including land development at 2nd Pump house of PALSIT within command area of PALSIT Piped W/S. Scheme under Burdwan Division, PHE. Dte. [Group : F] | ORD/000057/2022-2023 | 238/AE/HQ | 19/04/2022 | 30 | M/S F.S. ENTERPRISE | 0.96 | 0.00 | 1 | |||
| 128 | Burdwan Division | Modification to the distribution network by making a loop to augment the water supply to FHTC at Gopinathbati village of Dwariyapur and its adjoining mouzas W/S Scheme under Durgapur Sub-Division, Burdwan Division, P.H.E. Dte._2nd call[SL-05] | ORD/000057/2023-2024 | 180/DSD | 18/04/2023 | 21 | ANIRUDDHA FARUQUE | 0.92 | 0.00 | 100 | |||
| 129 | Burdwan Division | Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of SUDPUR Piped Water Supply Scheme (PART-A) at Katwa-I Block under Burdwan Division, PHE Dte. [Agreement No. 44/2020-2021 OF SE/CC/PHE. DTE.] | ORD/000058/2020-2021 | 4290/BWD | 03/11/2020 | 90 | MD HASIN | 86.85 | 68.84 | 1 | |||
| 130 | Burdwan Division | Sinking of additional 300 X 200mm dia Tube Well 200 mtr. Depth by D.R. Rig method using UPVC pipe (CD) and UPVC Deep Well Screen (RDS) at 1st & 2nd Tubewell Site for Augmentation of BHATAR (Zone-I) Piped Water Supply Scheme, Block - Bhatar, Dist - Purba Bardhaman under Burdwan Division, PHE Dte. [2 Nos. GTW]. | ORD/000059/2022-2023 | 2240/BWD | 02/05/2022 | 45 | AUXILIARY TUBE WELL DRILLERS | 28.54 | 0.00 | 1 | |||
| 131 | Burdwan Division | Replacement of damaged AC pipeline at Raipur under Mankar (Zone-II) piped water supply scheme within Galsi-I Block within Durgapur (Burdwan North) Sub Division under Burdwan Division, P.H.E. Dte.[SL-06] | ORD/000060/2023-2024 | 182/DSD | 18/04/2023 | 21 | MONDAL CONSTRUCTION | 0.97 | 0.00 | 0 | |||
| 132 | Burdwan Division | Additional work for Construction of boundary wall at Pump house no - 3 Site of Hatgobindapur Water Supply Scheme under Bardhaman-II Dev. Block of Burdwan Division, PHE Dte. (Length -18.00 Mtr, Col-2 Nos). Group - A. | ORD/000061/2022-2023 | 722/BSD | 02/05/2022 | 30 | MOHAMMAD ISSA | 1.48 | 0.00 | 1 | |||
| 133 | Burdwan Division | Extension Pipeline with Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of MADANAGAR Piped Water Supply Scheme within Raina I Block of Burdwan Sub-Division under Burdwan Division, PHE Dte. | ORD/000063/2023-2024 | 1935/BWD | 24/04/2023 | 30 | S.C. ENTERPRISE | 20.87 | 0.00 | 100 | |||
| 134 | Burdwan Division | Sinking of additional 250 X 150mm dia Tube Well 150 mtr. Depth by D.R. Rig method using UPVC pipe (CD) and UPVC Deep Well Screen (RDS) for BALGONA Piped Water Supply Scheme, Block - Bhatar, Dist - Purba Bardhaman under Burdwan Division, PHE Dte. | ORD/000066/2022-2023 | 2389/BWD | 10/05/2022 | 30 | ANIRUDDHA FARUQUE | 9.03 | 0.00 | 1 | |||
| 135 | Burdwan Division | Laying of UPVC Pipeline for providing FHTC at Kanshra Mouza (Habitation) under KANSHRA Piped Water Supply Scheme, Jamalpur Development Block under Burdwan Division, PHE Dte. | ORD/000067/2023-2024 | 2018/BWD | 28/04/2023 | 30 | TARAMA AGENCY | 12.58 | 0.00 | 0 | |||
| 136 | Burdwan Division | Providing FHTC for Dogachia Mouza [(Habitation (Village)] for AMRA piped W/S Scheme, Jamalpur Dev. Block under Burdwan Division, PHE Dte. | ORD/000068/2023-2024 | 2019/BWD | 28/04/2023 | 30 | DEY NIRMAN | 20.61 | 0.00 | 100 | |||
| 137 | Burdwan Division | Detail route survey, design of distribution network and preparation of estimate, drawing & DPR for providing FHTC in the scheme AGRADWIP, KHETPUR PALASHI, SAHAPUR PWSS (Sl No-1) | ORD/000069/2023-2024 | 393/KTS | 13/04/2023 | 30 | SIRCON ENGINEERING SERVICES | 3.71 | 0.00 | 100 | |||
| 138 | Burdwan Division | Detail route survey, design of distribution network and preparation of estimate, drawing & DPR for providing FHTC in the scheme EKAIHAT, PANUHAT PWSS (Sl No-2) | ORD/000070/2023-2024 | 394/KTS | 13/04/2023 | 30 | SIRCON ENGINEERING SERVICES | 2.48 | 0.00 | 100 | |||
| 139 | Burdwan Division | Detail route survey, design of distribution network and preparation of estimate, drawing & DPR for providing FHTC in the scheme SRIKHANDA, SUDPUR PWSS (Sl No-3) | ORD/000071/2023-2024 | 395/KTS | 13/04/2023 | 30 | SIRCON ENGINEERING SERVICES | 2.48 | 0.00 | 100 | |||
| 140 | Burdwan Division | Sinking of additional 250 X 200mm dia Tube Well 150 mtr. Depth by D.R. Rig method using UPVC pipe (CD) and UPVC Deep Well Screen (RDS) for KULINGRAM Piped Water Supply Scheme, Block - Jamalpur, Dist - Purba Bardhaman under Burdwan Division, PHE Dte. | ORD/000073/2022-2023 | 2473/BWD | 12/05/2022 | 30 | NADIA TUBEWELLS | 10.32 | 0.00 | 1 | |||
| 141 | Burdwan Division | Extension of pipe line from the existing Distribution System within scheme jurisdiction at Chanak village under Kashiara PWSS under Mongalkote Block under Katwa Sub-Division under Burdwan Division PHE Dte. _2nd Call [Sl No-01] | ORD/000076/2022-2023 | 319/KTS | 25/04/2022 | 21 | ASMA ENTERPRISE | 0.95 | 0.00 | 1 | |||
| 142 | Burdwan Division | Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Amra village of Natungram piped water supply scheme within Burdwan Sub-Division under Burdwan Division, PHE Dte. [Phase-I](Tr No.-332/BWD/2020-21) | ORD/000079/2020-2021 | 2732/BWD | 10/08/2020 | 30 | BAMDEB CONSTRUCTION & CO | 4.92 | 4.92 | 1 | |||
| 143 | Burdwan Division | Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Natu village of Natu piped water supply scheme within Headquarters under Burdwan Division, PHE Dte. [Phase-I](Tr No.-162/BWD/2020-21) | ORD/000080/2020-2021 | 2687/BWD | 07/08/2020 | 30 | SINGHA ROY AND CO. | 4.92 | 4.92 | 1 | |||
| 144 | Burdwan Division | Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of RAYAN Piped Water Supply Scheme at Naridaspara and balance portion of Sukantapally, Suryapally, Nari Purbapara & Nasakali (Nari Mouza), Burdwan - I Block under Burdwan Division, PHE. Dte. | ORD/000080/2022-2023 | 2558/BWD | 19/05/2022 | 30 | SARKAR AGENCY | 41.42 | 0.00 | 1 | |||
| 145 | Burdwan Division | Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Haripur village of Natu piped water supply scheme within Headquarters under Burdwan Division, PHE Dte. [Phase-I](Tr No.-161/BWD/2020-21) | ORD/000081/2020-2021 | 2688/BWD | 07/08/2020 | 30 | MITRA CONSTRUCTION | 4.92 | 4.92 | 1 | |||
| 146 | Burdwan Division | Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Palla(Pt-B) village of Palla piped water supply scheme within Burdwan Sub-Division under Burdwan Division, PHE Dte. [Phase-I](Tr No.-246/BWD/2020-21) | ORD/000082/2020-2021 | 2738/BWD | 10/08/2020 | 30 | S.C. ENTERPRISE | 4.92 | 4.92 | 1 | |||
| 147 | Burdwan Division | Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Amra village of Amra piped water supply scheme within Burdwan Sub-Division under Burdwan Division, PHE Dte. [Phase-I](Tr No.-208/BWD/2020-21) | ORD/000083/2020-2021 | 2734/BWD | 10/08/2020 | 30 | DEBASHISH ENTERPRISE | 4.92 | 4.92 | 1 | |||
| 148 | Burdwan Division | Construction of boundary wall including land development at 3rd Tube Well site of Sahhosenpur water supply scheme under Jamalpur Block of Burdwan Division, PHE Dte. (Length -58.00 Mtr, Col-21 Nos). GROUP : D | ORD/000083/2022-2023 | 817/BSD | 20/05/2022 | 45 | SARKAR CONSTRUCTION | 3.47 | 0.00 | 1 | |||
| 149 | Burdwan Division | Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Sultanpur village of Sultanpur piped water supply scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. [Phase-I](Tr No.-373/BWD/2020-21) | ORD/000084/2020-2021 | 2602/BWD | 04/08/2020 | 30 | INVENT ENGINEERS CO. OPERATIVE SOCIETY LTD. | 4.91 | 4.91 | 1 | |||
| 150 | Burdwan Division | Construction of Boundary wall at 3rd TW site for Chakshanjadi W/S Scheme with in Jamalpur block under Burdwan Div. PHED.(Lenth-48.0mtr & Col.-19nos.) GROUP : E | ORD/000084/2022-2023 | 818/BSD | 20/05/2022 | 45 | M/S PURBASHA | 4.06 | 0.00 | 1 | |||
| 151 | Burdwan Division | Continuation work order for Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Teli Nuri village of Amra piped water supply scheme within Burdwan Sub-Division under Burdwan Division, PHE Dte. [Phase-I](Tr No.-427/BWD/2020-21) | ORD/000085/2020-2021 | 3530/BWD | 25/09/2020 | 30 | KALYAN CHOWDHURY | 4.92 | 4.92 | 1 | |||
| 152 | Burdwan Division | Extension of pipeline in connection with FHTC for MANKAR Piped W/S Scheme under Galsi-I Block within Durgapur Sub Division under Burdwan Division, P.H.E. Dte. (Gr.-B) | ORD/000085/2021-2022 | 446/DSD | 14/07/2021 | 30 | N.B. CONSTRUCTION | 1.81 | 0.00 | 1 | |||
| 153 | Burdwan Division | Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Deriapur village of Deriapur piped water supply scheme within Headquarters under Burdwan Division, PHE Dte. [Phase-I](Tr No.-158/BWD/2020-21) | ORD/000086/2020-2021 | 2691/BWD | 07/08/2020 | 30 | ASHOK KUMAR GHOSH | 4.92 | 4.92 | 1 | |||
| 154 | Burdwan Division | BALANCE PORTION Boundary wall at 3RD Tubewell site Of Jaugram Water Supply scheme under JAMALPUR Block of Burdwan Division, PHE Dte. (LENGTH- 34.0M , COL- 14 NOS) GROUP : G | ORD/000086/2022-2023 | 820/BSD | 20/05/2022 | 45 | MUKHERJEE ENTERPRISE | 3.30 | 0.00 | 1 | |||
| 155 | Burdwan Division | Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Gopalpur village of Sultanpur piped water supply scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. [Phase-I](Tr No.-338/BWD/2020-21) | ORD/000087/2020-2021 | 2609/BWD | 04/08/2020 | 30 | BISWAS ENTERPRISE | 4.91 | 4.91 | 1 | |||
| 156 | Burdwan Division | Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of Mongalkot Piped Water Supply Scheme at Mongalkot (3 Nos Habitation) Village (Mouza), Mongalkot Block under Burdwan Division, PHE Dte. | ORD/000087/2021-2022 | 3598/BWD | 13/07/2021 | 60 | S.S. CONSTRUCTION | 115.84 | 0.00 | 1 | |||
| 157 | Burdwan Division | Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Mugura village of Mugura piped water supply scheme within Headquarters under Burdwan Division, PHE Dte. [Phase-I](Tr No.-163/BWD/2020-21) | ORD/000088/2020-2021 | 2690/BWD | 07/08/2020 | 30 | LAKSHMIKANTA DAS | 4.92 | 4.92 | 1 | |||
| 158 | Burdwan Division | Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of Krishnabati Piped Water Supply Scheme at Bahara (3 Nos Habitation), Chak Bahara (Natungram Habitation), Chandanpur Simuldanga & Krishnabati (2 Nos Habitation) Village (Mouza), Mangalkot Block under Burdwan Division, PHE Dte. | ORD/000088/2021-2022 | 3592/BWD | 13/07/2021 | 60 | H SAMANTA | 84.33 | 0.00 | 100 | |||
| 159 | Burdwan Division | Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Chaitynapur village of Jaggeswardihi piped water supply scheme within Katwa Sub-Division under Burdwan Division, PHE Dte. [Phase-I](Tr No.-204/BWD/2020-21) | ORD/000089/2020-2021 | 2604/BWD | 04/08/2020 | 30 | SUBRATA GUPTA | 4.92 | 4.92 | 1 | |||
| 160 | Burdwan Division | Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of Nandai Piped Water Supply Scheme at Nandai (Part) (7 Nos Habitation Part), Nagargachhi, Pardupra & Uttar Rameswarpur (Part) Village (Mouza), Kalna-I Block under Burdwan Division, PHE Dte. | ORD/000089/2021-2022 | 3599/BWD | 13/07/2021 | 60 | INDIAN ENGINEERS CO.-OPERATIVE SOCIETY LTD. | 110.43 | 0.00 | 1 | |||
| 161 | Burdwan Division | Continuation work order for Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Anguna village of Anguna piped water supply scheme within Headquarters under Burdwan Division, PHE Dte. [Phase-I](Tr No.-302/BWD/2020-21) | ORD/000090/2020-2021 | 3355/BWD | 21/09/2020 | 30 | ANWESHA CONSTRUCTION | 4.59 | 4.59 | 1 | |||
| 162 | Burdwan Division | Supply of 10 mm NB Gun-metal Ferrule conforming to IS: 2692-1989 for Water tap connection in each house hold from existing distribution system within Scheme jurisdiction in different Piped Water Supply Scheme within Kalna Sub-Division under Burdwan Division, PHE. Dte. and delivered at Borsul Divl. Store. [Part-5]. | ORD/000090/2021-2022 | 3590/BWD | 13/07/2021 | 30 | PREMANANDA ROY BISWAS | 127.50 | 127.75 | 1 | |||
| 163 | Burdwan Division | Laying of 200mm.dia. HDPE Distribution pipe line (Node No.118 to 119) for Masagram (Zone-I) & adjoining mouzas Water Supply Scheme at Jamalpur Development block under Burdwan Division,PHE Dte. Group : C. | ORD/000090/2022-2023 | 830/BSD | 23/05/2022 | 30 | M/S ASHA CONSTRUCTION | 4.60 | 0.00 | 1 | |||
| 164 | Burdwan Division | Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of Srirampur Piped Water Supply Scheme at Srirampur (Srirampur & Srirampur East Para Habitation) Village (Mouza), Purbasthali-I Block under Burdwan Division, PHE Dte. | ORD/000091/2021-2022 | 3654/BWD | 14/07/2021 | 60 | ASHOK KUMAR GHOSH | 102.42 | 0.00 | 1 | |||
| 165 | Burdwan Division | Laying of 200mm.dia. HDPE Distribution pipe line(Node No.401B to 401)for MAHESHDANGA & adjoining mouzas Water Supply Scheme at Memari-I Development block under Burdwan Division,PHE Dte. Group - D. | ORD/000091/2022-2023 | 831/BSD | 23/05/2022 | 30 | M/S ASHA CONSTRUCTION | 4.49 | 0.00 | 1 | |||
| 166 | Burdwan Division | Continuation work order for Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Amra village of Amra piped water supply scheme within Burdwan Sub-Division under Burdwan Division, PHE Dte. [Phase-I](Tr No.-404/BWD/2020-21) | ORD/000092/2020-2021 | 3531/BWD | 25/09/2020 | 30 | DEBASHISH ENTERPRISE | 4.92 | 4.92 | 1 | |||
| 167 | Burdwan Division | Construction of different slab of damage valve chamber due to widening of PMGSY ROAD and sand filling of PMGSY ROAD of Sahahossenpur water supply scheme under Jamalpur Block of Burdwan Division, PHE Dte. Gr.E. | ORD/000092/2022-2023 | 832/BSD | 23/05/2022 | 30 | ROY BISWAS CONSTRUCTION | 2.68 | 0.00 | 1 | |||
| 168 | Burdwan Division | Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Dogachia village of Amra piped water supply scheme within Burdwan Sub-Division under Burdwan Division, PHE Dte. [Phase-I](Tr No.-232/BWD/2020-21) | ORD/000093/2020-2021 | 2737/BWD | 10/08/2020 | 30 | KALYAN CHOWDHURY | 4.92 | 4.92 | 1 | |||
| 169 | Burdwan Division | Repairing of Pipeline of DVC 11 No. Canal towards Amila Bazar and DVC 11B No. Conal Towards Sehara Bazar at TARAPOSH Pipes Water Supply Scheme at Khandaghosh Block under Burdwan Division,PHE Dte. Group : F | ORD/000093/2022-2023 | 833/BSD | 23/05/2022 | 30 | HAFIJUR RAHAMAN MIDYA | 1.56 | 0.00 | 1 | |||
| 170 | Burdwan Division | Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Palla(Pt-A) village of Palla piped water supply scheme within Burdwan Sub-Division under Burdwan Division, PHE Dte. [Phase-I](Tr No.-245/BWD/2020-21) | ORD/000094/2020-2021 | 2746/BWD | 10/08/2020 | 30 | JAYANTA CHAKRABORTY | 4.92 | 4.92 | 1 | |||
| 171 | Burdwan Division | Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Jagarpur & Mugura village of Mugura piped water supply scheme within Headquarters under Burdwan Division, PHE Dte. [Phase-I](Tr No.-238/BWD/2020-21) | ORD/000095/2020-2021 | 2689/BWD | 07/08/2020 | 30 | HAFIJUR RAHAMAN MIDYA | 4.92 | 4.92 | 1 | |||
| 172 | Burdwan Division | Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Gunar village of Anguna piped water supply scheme within Headquarters under Burdwan Division, PHE Dte. [Phase-I](Tr No.-203/BWD/2020-21) | ORD/000096/2020-2021 | 2693/BWD | 07/08/2020 | 30 | M/S ANAND CONSTRUCTION | 4.92 | 4.92 | 1 | |||
| 173 | Burdwan Division | Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Anguna village of Anguna piped water supply scheme within Headquarters under Burdwan Division, PHE Dte. [Phase-I](Tr No.-171/BWD/2020-21) | ORD/000097/2020-2021 | 2684/BWD | 07/08/2020 | 30 | ANWESHA CONSTRUCTION | 4.91 | 4.91 | 1 | |||
| 174 | Burdwan Division | Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of Mankar Piped Water Supply Scheme at Mankar (Part) Village (Mouza) under Burwan Division, PHE Dte. | ORD/000097/2021-2022 | 3591/BWD | 13/07/2021 | 60 | SAMRAT REALPROJECTS PRIVATE LIMITED | 140.03 | 0.00 | 1 | |||
| 175 | Burdwan Division | Construction of boundary wall at Head works site of NABASTHA Piped Water Supply Scheme in Burdwan-II Block under Burdwan Division, PHE Dte. (Length - 154 Mtr., 69 Nos Column). | ORD/000097/2022-2023 | 2742/BWD | 08/06/2022 | 30 | MOYAZZEM CONSTRUCTION | 10.54 | 0.00 | 1 | |||
| 176 | Burdwan Division | Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Saktigarh (Pt-A) village of Saktigarh piped water supply scheme within Burdwan Sub-Division under Burdwan Division, PHE Dte. [Phase-I](Tr No.-172/BWD/2020-21) | ORD/000098/2020-2021 | 2747/BWD | 10/08/2020 | 30 | SARKAR AGENCY | 4.92 | 4.92 | 1 | |||
| 177 | Burdwan Division | Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of Mankar Piped Water Supply Scheme at Bagabanpur (Part), Budbud (Part) & Mallikpur (Part) Village (Mouza) under Burwan Division, PHE Dte. | ORD/000098/2021-2022 | 3372/BWD | 23/06/2021 | 60 | SAMRAT REALPROJECTS PRIVATE LIMITED | 79.30 | 0.00 | 1 | |||
| 178 | Burdwan Division | Construction of boundary wall at Head works site of CHAKSHANJADI Piped Water Supply Scheme in Jamalpur Block under Burdwan Division, PHE Dte. (Length - 123 Mtr., 46 Nos Column). | ORD/000098/2022-2023 | 2743/BWD | 08/06/2022 | 30 | MOYAZZEM CONSTRUCTION | 8.12 | 0.00 | 1 | |||
| 179 | Burdwan Division | Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of Rayan Piped Water Supply Scheme at Rayan (Part) (Baisnabpara, Bayanpara, Bhotargra, Bhtarpur, DVC Canal, Dakhinpara, Dangapara, Daspara, Dulapara, Durgamandir, Ghatimgore, Gopaldighi & Hatu Dewan (N)) Village (Mouza), Bardhaman-I Block under Burdwan Division, PHE Dte.._2ND CALL. | ORD/000099/2021-2022 | 3202/BWD | 09/06/2021 | 60 | SUNNY ELECTRIC CO. | 53.10 | 0.00 | 1 | |||
| 180 | Burdwan Division | Continuation work order for Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Gunar village of Anguna piped water supply scheme within Headquarters under Burdwan Division, PHE Dte. [Phase-I](Tr No.-369/BWD/2020-21) | ORD/000101/2020-2021 | 3515/BWD | 25/09/2020 | 30 | M/S ANAND CONSTRUCTION | 2.17 | 2.17 | 1 | |||
| 181 | Burdwan Division | Laying of 100 mm dia D.I Pipe for Road widening from 4 lane to 6 lane of NH2 at chainage 596+286 & 596+086 & 596+ 486 at Amra Water supply within Jamalpur Block,under Burdwan Division,PHE Dte". Group : A. | ORD/000101/2022-2023 | 982/BSD | 16/06/2022 | 30 | DEY NIRMAN | 2.89 | 0.00 | 0 | |||
| 182 | Burdwan Division | Providing FHTC for 100% coverage at Baidyabatipur, Tilkuria, Mahishgaria, Narayanpur & Mathurapur village (Mouza) for MAHISHGARIA Piped W/S Scheme, Jamalpur Dev. Block under Burdwan Division, PHE Dte. | ORD/000101/2023-2024 | 2259/BWD | 18/05/2023 | 30 | MUKHERJEE ENTERPRISE | 11.92 | 0.00 | 100 | |||
| 183 | Burdwan Division | Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Nandra village of Nandra piped water supply scheme within Burdwan Sub-Division under Burdwan Division, PHE Dte. [Phase-I](Tr No.-176/BWD/2020-21) | ORD/000102/2020-2021 | 2735/BWD | 10/08/2020 | 30 | BHARAT CONSTRUCTION | 4.92 | 4.92 | 1 | |||
| 184 | Burdwan Division | Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of Ghosh Piped Water Supply Scheme at Mondaljana Part (Bajamondaljana, Kashirampur & Mondaljana Habitation), Horirampur & Ghosh Part Village (Mouza) Memari-I Block under Burdwan Division, PHE Dte. | ORD/000102/2021-2022 | 3781/BWD | 22/07/2021 | 30 | KAUSHIK RAY | 20.09 | 20.09 | 1 | |||
| 185 | Burdwan Division | Extension of pipe line for BAGILA Piped Water Supply Scheme at Krishnapur,Baharampur,Kiskindha,Taktipur in Memari-I Block including leftout household water tap connection (FHTC) under Burdwan Division, PHE Dte.Group : A | ORD/000102/2022-2023 | 983/BSD | 16/06/2022 | 30 | A R TRADERS | 4.83 | 0.00 | 1 | |||
| 186 | Burdwan Division | Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Kalyanpur & Dangachha village of Nandra piped water supply scheme within Burdwan Sub-Division under Burdwan Division, PHE Dte. [Phase-I](Tr No.-177/BWD/2020-21) | ORD/000103/2020-2021 | 2736/BWD | 10/08/2020 | 30 | BHARAT CONSTRUCTION | 4.92 | 4.92 | 1 | |||
| 187 | Burdwan Division | Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of Amrargarh Piped Water Supply Scheme at Amrargarh (10 Nos Habitation), Dombandi (2 Nos Habitation), Jamtara (2 Nos Habitation) & Panch Mahali Village (Mouza), Ausgram-II Block under Burdwan Division, PHE Dte. | ORD/000103/2021-2022 | 3875/BWD | 27/07/2021 | 60 | B.B.C. ENTERPRISE | 91.55 | 0.00 | 100 | |||
| 188 | Burdwan Division | Providing Functional Household Tap Connection(FHTC)from existing distribution system within the command area of PALLA Water supply scheme at Palla(Paschim palla Habitation part) village (Mouza) opposite side of navigation cannel, in Memari-I Block including leftout household water tap connection(FHTC) under Burdwan Division, PHE Dte. Group : B | ORD/000103/2022-2023 | 984/BSD | 16/06/2022 | 30 | DUBE ENTERPRISE | 4.22 | 0.00 | 1 | |||
| 189 | Burdwan Division | Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Khetpur (Pt.-A) village of Khetpur Palasi piped water supply scheme within Katwa Sub-Division under Burdwan Division, PHE Dte. [Phase-I](Tr No.-183/BWD/2020-21) | ORD/000104/2020-2021 | 2601/BWD | 04/08/2020 | 30 | CHANCHAL PAL | 4.92 | 4.92 | 1 | |||
| 190 | Burdwan Division | Extension of pipe linefor providing functional house hold tap connection at Sanchra habitation(Part)of MOSAGRAM ZONE-II Piped Water Supply Schemewithin Burdwan Sub-Divn under Burdwan Division,PHE Dte". Group : E. | ORD/000104/2022-2023 | 987/BSD | 16/06/2022 | 30 | MD HASIN | 2.51 | 0.00 | 1 | |||
| 191 | Burdwan Division | Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Khetpur (Pt-B) village of Khetpur Palasi piped water supply scheme within Katwa Sub-Division under Burdwan Division, PHE Dte. [Phase-I](Tr No.-165/BWD/2020-21) | ORD/000105/2020-2021 | 2605/BWD | 04/08/2020 | 30 | SANTANU BHATTACHARYAY | 4.92 | 4.92 | 1 | |||
| 192 | Burdwan Division | Extension of pipeline in Connection to FHTC work at Gramdihi village of Gramdihi and its adjoining Mouza's Piped W/S Scheme at Bhatar Block within Durgapur (Bardhaman North)Sub-Division under Burdwan Division, P.H.E. Dte. (Gr.-A) | ORD/000105/2021-2022 | 416/DSD | 02/07/2021 | 30 | DEY NIRMAN | 4.71 | 3.88 | 1 | |||
| 193 | Burdwan Division | Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Bikaihat & Akaihat village of Ekaihat piped water supply scheme within Katwa Sub-Division under Burdwan Division, PHE Dte. [Phase-I](Tr No.-169/BWD/2020-21) | ORD/000106/2020-2021 | 2598/BWD | 04/08/2020 | 30 | JAGADANANDAPUR CO. OP. LABOUR CONTRACT AND CONSTRUCTION SOCIETY LTD. | 4.92 | 4.92 | 1 | |||
| 194 | Burdwan Division | Construction of boundary wall including land development at 2nd Tube Well site of MAHESHDANGA water supply scheme under Memari-I Block of Burdwan Division, PHE Dte. (Length -52.00 Mtr, Col-20 Nos). " Group : C. | ORD/000106/2022-2023 | 985/BSD | 16/06/2022 | 45 | MAA MAHAMAYA CONSTRUCTION | 3.46 | 0.00 | 1 | |||
| 195 | Burdwan Division | Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Akaihat village of Ekaihat piped water supply scheme within Katwa Sub-Division under Burdwan Division, PHE Dte. [Phase-I](Tr No.-196/BWD/2020-21) | ORD/000107/2020-2021 | 2597/BWD | 04/08/2020 | 30 | JAI MAA DURGA & CO. | 4.92 | 4.92 | 1 | |||
| 196 | Burdwan Division | Continuation work order for Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Deriapur village of Deriapur piped water supply scheme within Headquarters under Burdwan Division, PHE Dte. [Phase-I](Tr No.-351/BWD/2020-21) | ORD/000108/2020-2021 | 3898/BWD | 12/10/2020 | 30 | ASHOK KUMAR GHOSH | 3.59 | 3.59 | 1 | |||
| 197 | Burdwan Division | Supply of 10 mm NB Gun-Metal Ferrule conforming to IS:2692-1989 for water tap connection in each house hold from existing distribution system within scheme jurisdiction in different piped water supply scheme within Katwa Sub-Division under Burdwan Division, PHE Dte. and delivered at Barsul Divisional Store.[Part-4] | ORD/000108/2021-2022 | 3186/BWD | 08/06/2021 | 30 | R.K. INDUSTRIES | 76.05 | 76.05 | 0 | |||
| 198 | Burdwan Division | Land Development(at entrance)of Head Works Site of of KAMARHATI ZONE-II PIPED Water Supply Scheme at RAINA-II Block within Burdwan Sub-Division under Burdwan Division, PHE Dte. Group : F. | ORD/000108/2022-2023 | 988/BSD | 16/06/2022 | 15 | JMD ENGINEERING INFRASTRUCTURE COMPANY | 1.85 | 0.00 | 1 | |||
| 199 | Burdwan Division | Laying of 100 mm dia D.I Pipe for Road widening from 4 lane to 6 lane of NH2 at chainage 599+654 & 599+154 at Jougram Water supply within Jamalpur Block,under Burdwan Division,PHE Dte". Group : B. | ORD/000109/2022-2023 | 981/BSD | 16/06/2022 | 30 | PRATIVA CONSTRUCTION | 2.97 | 0.00 | 0 | |||
| 200 | Burdwan Division | Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of Mankar Piped Water Supply Scheme at Sukdal Village (Mouza) 5 nos Habitation under Burwan Division, PHE Dte. | ORD/000110/2021-2022 | 3878/BWD | 27/07/2021 | 60 | SUJAY KUMAR RAY | 151.77 | 0.00 | 1 | |||
| 201 | Burdwan Division | Pipeline with FHTC for KAMARHATI ZONE -II Water Supply Scheme at Kamarhati village(70 NOS) of Raina-II Block,under Burdwan Division, PHE Dte. Group : B. | ORD/000110/2022-2023 | 1015/BSD | 20/06/2022 | 30 | KONAR ENTERPRISE | 4.95 | 0.00 | 1 | |||
| 202 | Burdwan Division | Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of Mondalgram Piped Water Supply Scheme at Mondalgram (10 Nos Habitation) Village (Mouza), Memari-II Block under Burdwan Division, PHE Dte. | ORD/000111/2021-2022 | 3879/BWD | 27/07/2021 | 60 | SUPRIYA RAY | 102.04 | 0.00 | 1 | |||
| 203 | Burdwan Division | Pipeline with FHTC for KAMARHATI ZONE -II Water Supply Scheme at Kamarhati village(80 NOS) of Raina-II Block,under Burdwan Division, PHE Dte. Group : C. | ORD/000111/2022-2023 | 1016/BSD | 20/06/2022 | 30 | D.M. ENTERPRISE | 4.94 | 0.00 | 1 | |||
| 204 | Burdwan Division | Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of TEANDUL Piped Water Supply Scheme at Raina-I Block under Burdwan Division, PHE Dte.(Agreement No. 61/2020-2021 OF SE/CC/PHE. DTE.) | ORD/000112/2020-2021 | 4881/BWD | 07/12/2020 | 90 | ASHOK KUMAR GHOSH | 70.51 | 26.97 | 1 | |||
| 205 | Burdwan Division | Repairing and Restoration of damaged and chokaged various Dia UPVC Pipeline and Construction of Valve Chambers to conrrol flow of waer for providing FHTC in JOUGRAM PWSS at Jamalpur Dev.block under Burdwan Division,PHE Dte.Group : D. | ORD/000112/2022-2023 | 1017/BSD | 20/06/2022 | 30 | MUKHERJEE ENTERPRISE | 1.43 | 0.00 | 1 | |||
| 206 | Burdwan Division | Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of MANIKHAR Piped Water Supply Scheme at Kalna-I Block under Burdwan Division, PHE Dte. (Agreement No. 47/2020-2021 OF SE/CC/PHE. DTE.) | ORD/000113/2020-2021 | 4787/BWD | 02/12/2020 | 90 | H SAMANTA | 96.04 | 0.00 | 1 | |||
| 207 | Burdwan Division | Supply of SS316 grade flow control valve for FHTC at Surface Water Based w/s scheme for Arsenic affected areas of Purbasthali-II block within Kalna Sub-Division under Burdwan Division, PHE Dte. (Part-A) and delivered to Barsul Divisional Store .[Part-3] | ORD/000113/2021-2022 | 3836/BWD | 23/07/2021 | 15 | A.K. SIKDAR | 17.62 | 17.62 | 1 | |||
| 208 | Burdwan Division | Pipeline with FHTC for KAMARHATI ZONE -II Water Supply Scheme at Kamarhati village (52 Nos.) of Raina-II Block,under Burdwan Division, PHE Dte. Group : A. | ORD/000113/2022-2023 | 1035/BSD | 20/06/2022 | 30 | KOUSIK MALLICK | 4.96 | 0.00 | 1 | |||
| 209 | Burdwan Division | Laying of UPVC pipeline for smooth running of FHTC work of SHUSHUNIA Water Supply Scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. | ORD/000115/2023-2024 | 2342/BWD | 22/05/2023 | 30 | SUSUNIA GP CO. OPERATIVE LABOUR CONTRACT AND CONSTRUCTION SOCIETY LTD. | 22.26 | 0.00 | 100 | |||
| 210 | Burdwan Division | Continuation work order for Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Sultanpur village of Sultanpur piped water supply scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. [Phase-I](Tr No.-374/BWD/2020-21) | ORD/000116/2020-2021 | 3701/BWD | 05/10/2020 | 30 | INVENT ENGINEERS CO. OPERATIVE SOCIETY LTD. | 4.19 | 4.19 | 1 | |||
| 211 | Burdwan Division | Left out FHTC (Hatgobindapur, Banagram, Ramnagar & Hatkanda village) of HATGOBINDAPUR PWSS under Burdwan-II Block of Burdwan Sub-Division under Burdwan Division, PHE Dte. | ORD/000116/2023-2024 | 2302/BWD | 19/05/2023 | 30 | M/S SAYAN CHAKRABORTY | 9.60 | 0.00 | 100 | |||
| 212 | Burdwan Division | Providing left out FHTC for 100% covarage in different village within PALSIT PWSS , Bardhhaman-II Development Block under Burdwan Division, PHE Dte. | ORD/000116/2024-2025 | 995/BSD | 06/06/2024 | 30 | M/S PALASH BISWAS | 0.96 | 0.00 | 100 | |||
| 213 | Burdwan Division | Continuation work order for Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Palla(Pt-A) village of Palla piped water supply scheme within Burdwan Sub-Division under Burdwan Division, PHE Dte. [Phase-I](Tr No.-487/BWD/2020-21) | ORD/000117/2020-2021 | 3972/BWD | 14/10/2020 | 30 | JAYANTA CHAKRABORTY | 4.92 | 4.92 | 1 | |||
| 214 | Burdwan Division | Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Chhotobainan village of Chhotobainan piped water supply scheme within Burdwan Sub-Division under Burdwan Division, PHE Dte. [Phase-I](Tr No.-173/BWD/2020-21) | ORD/000118/2020-2021 | 2740/BWD | 10/08/2020 | 30 | BOSE ENTERPRISE | 4.90 | 4.90 | 1 | |||
| 215 | Burdwan Division | Modification to Rising main and D.I. distribution to ensure more controll of water supply of MANKAR water Supply Scheme under Durgapur (Burdwan North) Sub-Division in Galsi-I Block under Burdwan Division, P.H.E. Dte. [SL-E] | ORD/000118/2022-2023 | 336/DSD | 27/06/2022 | 21 | SHUBHRA KANTI GHOSH | 2.82 | 0.00 | 1 | |||
| 216 | Burdwan Division | Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Momrejpur village of Chhotobainan piped water supply scheme within Burdwan Sub-Division under Burdwan Division, PHE Dte. [Phase-I](Tr No.-174/BWD/2020-21) | ORD/000119/2020-2021 | 2741/BWD | 10/08/2020 | 30 | TIRUPATI ENTERPRISES | 4.92 | 4.92 | 1 | |||
| 217 | Burdwan Division | Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of SONARUDRA Piped Water Supply Scheme at Purbasthali-I Block under Burdwan Division, PHE Dte.(Agreement No. 51/2020-2021 OF SE/CC/PHE. DTE.) | ORD/000120/2020-2021 | 4900/BWD | 07/12/2020 | 90 | J.D.J. ENTERPRISE | 88.29 | 22.10 | 0 | |||
| 218 | Burdwan Division | Extension of pipe line from the existing Distribution System within scheme jurisdiction at Sudpur, Lokpur & Narayanpur village under SUDPUR PWSS under Katwa Sub-Division under Burdwan Division PHE Dte [Sl - 4 ] | ORD/000120/2021-2022 | 564/KTS | 31/08/2021 | 15 | BABUL SK | 2.42 | 0.00 | 1 | |||
| 219 | Burdwan Division | Placing of pipeline at "Patna and adj" villages of Balgona and its adjoining mouza's Piped W/S Scheme at Bhatar Block within Durgapur Sub Division under Burdwan Division, P.H.E. Dte. [SL-A] | ORD/000120/2022-2023 | 333/DSD | 27/06/2022 | 15 | R.K. ENTERPRISE | 1.11 | 0.00 | 0 | |||
| 220 | Burdwan Division | Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of SRIKHANDA Piped Water Supply Scheme at Katwa - I Block under Burdwan Division, PHE Dte.(Agreement No. 53/2020-2021 OF SE/CC/PHE. DTE.) | ORD/000121/2020-2021 | 4880/BWD | 07/12/2020 | 90 | ASHOK KUMAR GHOSH | 96.84 | 37.54 | 1 | |||
| 221 | Burdwan Division | Continuation work order for Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Dirghapara village and Dirghapara (Part-A) habitation of Dirghapara Piped Water Supply Scheme within Kalna Sub-Divn. under Burdwan Division, PHE. Dte. [Phase - I] [GROUP : ¿8A¿] | ORD/000121/2021-2022 | 4391/BWD | 31/08/2021 | 30 | HAFIJUR RAHAMAN MIDYA | 4.55 | 4.10 | 1 | |||
| 222 | Burdwan Division | Construction of Drain and restoration of connection for Augmentation of BHALKI W/S Scheme , Block- Ausgram-II, under Durgapur (Burdwan North)Sub Division Burdwan Division, P.H.E. Dte. [SL-B] | ORD/000121/2022-2023 | 334/DSD | 27/06/2022 | 30 | TAUSIF HOSSAIN MONDAL | 1.88 | 0.00 | 1 | |||
| 223 | Burdwan Division | Continuation work order for Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Hatgobindapur village (Part) of Hatgobindapur Piped Water Supply Scheme within Burdwan Sub-Divn. under Burdwan Division, PHE. Dte. [SL. No. : 01] | ORD/000122/2021-2022 | 4390/BWD | 31/08/2021 | 15 | M/S ASHA CONSTRUCTION | 4.86 | 0.00 | 1 | |||
| 224 | Burdwan Division | Construction of approach road from entrance to OHR, Pump House and filling of low land around Over Head Reservoir with carried earth at 1st Tube well site of Golgram & its adjoining mouzas water supply scheme, Block-Galsi-I, under Burdwan Division, PHE Dte. [SL-D] | ORD/000122/2022-2023 | 335/DSD | 27/06/2022 | 30 | CHOUDHURY INFRA | 1.86 | 0.00 | 1 | |||
| 225 | Burdwan Division | Continuation work order for Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Baitipara village (Baitipara habitation) of Tehata Piped Water Supply Scheme within Kalna Sub-Divn. under Burdwan Division, PHE. Dte. [Sl. No. : ¿01¿] | ORD/000123/2021-2022 | 4020/BWD | 05/08/2021 | 15 | SUKANTA DEY | 3.23 | 0.00 | 1 | |||
| 226 | Burdwan Division | Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of Sultanpur Piped Water Supply Scheme at Halbele, Hridaypur, Isabpur, Nowapara & Uplati Village (Mouza), Kalna ¿ I Block under Burdwan Division, PHE Dte.(Agreement No. 56/2020-2021 OF SE/CC/PHE. DTE.) | ORD/000124/2020-2021 | 4901/BWD | 07/12/2020 | 90 | MAJILA ENTERPRISE | 94.67 | 70.51 | 1 | |||
| 227 | Burdwan Division | Work order for Repairing of leakage of existing pipe line of Nasaratpur habitation of Purbasthali-I Block within Kalna Sub-Division under Burdwan Division, PHE Dte. | ORD/000124/2023-2024 | 419/KSD | 11/05/2023 | 30 | PARTHA PRATIM ACHARYA | 0.97 | 0.00 | 50 | |||
| 228 | Burdwan Division | Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of Putsuri Piped Water Supply Scheme at Denur (6 Nos Habitation Part) & Putsuri (11 Nos Habitation Part) Village (Mouza), Monteswar Block under Burdwan Division, PHE Dte.(Agreement No. 55/2020-2021 OF SE/CC/PHE. DTE.) | ORD/000125/2020-2021 | 4887/BWD | 07/12/2020 | 90 | M/S S. CHOUDHURY | 77.12 | 45.30 | 1 | |||
| 229 | Burdwan Division | Extension of pipe line from the existing Distribution System within scheme jurisdiction at Rayerpara, Purba and Paschim Bijoynagar village under SUDPUR PWSS under Katwa Sub-Division under Burdwan Division PHE Dte [Sl - 5 ] | ORD/000125/2021-2022 | 565/KTS | 31/08/2021 | 15 | HAMID SK | 3.60 | 0.00 | 1 | |||
| 230 | Burdwan Division | Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of Natu Piped Water Supply Scheme at Notu (2 Nos Habitation Part), Horipur (4 Nos Habitation Part), Uttar Mohanpur Village (Mouza), Raina-I Block under Burdwan Division, PHE Dte.(Agreement No. 49/2020-2021 OF SE/CC/PHE. DTE.) | ORD/000126/2020-2021 | 4767/BWD | 01/12/2020 | 90 | SINGHA ROY AND CO. | 57.87 | 24.77 | 1 | |||
| 231 | Burdwan Division | Restoration of Pump House at Head Work site of BAGILA Piped water supply scheme at Memari-I Block under Burdwan Division, Dist.-Purba Bardhaman | ORD/000126/2024-2025 | 1006/BSD | 06/06/2024 | 30 | A.R. TRADERS | 0.96 | 0.00 | 100 | |||
| 232 | Burdwan Division | Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of Chhotobainan Piped Water Supply Scheme at Chhotobainan (3 Nos Part Habitation), Akhina, Dakhin Mohanour, Pahalanpur & Rupsara Village (Mouza), Raina-II Block under Burdwan Division, PHE Dte.(Agreement No. 62/2020-2021 OF SE/CC/PHE. DTE.) | ORD/000127/2020-2021 | 4852/BWD | 04/12/2020 | 90 | TIRUPATI ENTERPRISES | 100.40 | 82.44 | 1 | |||
| 233 | Burdwan Division | Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of CHAKTENTUL Piped Water Supply Scheme at Chaktentul (1 No Part, 2 Nos Habitation), Bharatpur (2 Nos Habitation) Village (Mouza), Galsi-I Block under Burdwan Division, PHE Dte.(Agreement No. 71/2020-2021 OF SE/CC/PHE. DTE.) | ORD/000128/2020-2021 | 5005/BWD | 10/12/2020 | 90 | SUPRIYA RAY | 75.14 | 33.71 | 1 | |||
| 234 | Burdwan Division | Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of DERIAPUR Piped Water Supply Scheme at Astikur, Balagar & Bora Village (Mouza), Raina-I Block under Burdwan Division, PHE Dte.(Agreement No. 474/BWD OF 2020-2021) | ORD/000129/2020-2021 | 4916/BWD | 08/12/2020 | 90 | ASHOK KUMAR GHOSH | 39.84 | 29.82 | 1 | |||
| 235 | Burdwan Division | Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Mohara (Part), Kaitara (Part) and Khanhati (Part) Village of Adra Piped W/S Scheme within Durgapur (Bardhaman North) Sub-Division under Burdwan Division, P.H.E. Dte. [Gr.-A] | ORD/000129/2022-2023 | 342/DSD | 30/06/2022 | 21 | SHUBHRA KANTI GHOSH | 4.82 | 0.00 | 1 | |||
| 236 | Burdwan Division | Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of Bamunpara Piped Water Supply Scheme at Bamunpara (7 Nos Habitation Part), Sahajadpur (5 Nos Habitation Part), Gulita Daspara & Purba Khanpur (4 Nos Habitation) Village (Mouza), Monteswar Block under Burdwan Division, PHE Dte.(Agreement No. 69/2020-2021 OF SE/CC/PHE. DTE.) | ORD/000130/2020-2021 | 5002/BWD | 07/12/2020 | 90 | M/S S. CHOUDHURY | 50.71 | 38.98 | 1 | |||
| 237 | Burdwan Division | Laying parallel pipeline to increase the water supply towards Kalyanpur [ Node No-146 t0 100 ] of BAHIRGHANNYA and its adjoining mouza's Piped W/S Scheme at Galsi-II Block within Durgapur Sub Division under Burdwan Division, P.H.E. Dte. [Gr.-B] | ORD/000130/2022-2023 | 343/DSD | 30/06/2022 | 30 | SUPRIYA RAY | 4.89 | 0.00 | 1 | |||
| 238 | Burdwan Division | Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Purba Sahapur (Pt-B) village of Purba Sahapur Piped Water Supply Scheme within Kalna Sub-Divn. under Burdwan Division, PHE. Dte. [Phase - I] [Sl.No : 7B] | ORD/000131/2020-2021 | 2584/BWD | 09/07/2020 | 30 | SETH ENTERPRISE | 4.92 | 0.00 | 1 | |||
| 239 | Burdwan Division | Work order for Restoration of road and base concreting in FHTC for retrofitting of Shushunia water supply scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. | ORD/000131/2023-2024 | 427/KSD | 11/05/2023 | 30 | SUSUNIA GP CO. OPERATIVE LABOUR CONTRACT AND CONSTRUCTION SOCIETY LTD. | 0.60 | 0.00 | 100 | |||
| 240 | Burdwan Division | Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Purba Sahapur (Pt-A) village of Purba Sahapur Piped Water Supply Scheme within Kalna Sub-Divn. under Burdwan Division, PHE. Dte. [Phase - I] [Sl.No : 7A] | ORD/000132/2020-2021 | 2585/BWD | 09/07/2020 | 30 | YOUNG ENGINEERS CO.-OPERATIVE SOCIETY LTD. | 4.92 | 0.00 | 1 | |||
| 241 | Burdwan Division | Laying parallel pipeline to increase the water supply towards Kaldanda of PUBER and its adjoining mouza's Piped W/S Scheme at Ausgram-II Block within Durgapur Sub Division under Burdwan Division, P.H.E. Dte. [Gr.-C] | ORD/000132/2022-2023 | 344/DSD | 30/06/2022 | 30 | ANWESHA CONSTRUCTION | 4.81 | 0.00 | 1 | |||
| 242 | Burdwan Division | Augmentation of SAHAPUR Piped Water Supply Scheme with sinking of Tube-well, LDS, Rising Main, FHTC & renovation of switch-rooms & boundary walls at different TW site under Katwa-II Block, District:- Purba-Bardhaman. | ORD/000132/2023-2024 | 2343/BWD | 22/05/2023 | 120 | KHEPIMA ENGINEERS CO. OPERATIVE SOCIETY LTD. | 137.76 | 0.00 | 95 | |||
| 243 | Burdwan Division | Allied work of interconnection between 2nd TW to distribution line for FHTC work for KHETIA Piped Water Supply Scheme and its adjoining mouzas within BURDWAN-I BLOCK under Burdwan Division, PHE Dte. | ORD/000132/2024-2025 | 1016/BSD | 07/06/2024 | 45 | ROY CONSTRUCTION | 4.79 | 0.00 | 100 | |||
| 244 | Burdwan Division | Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Anguna village of Anguna Piped Water Supply Scheme within Headquarters under Burdwan Division, PHE. Dte. [Phase - I] [GROUP : ¿1A¿] | ORD/000133/2020-2021 | 2694/BWD | 10/07/2020 | 30 | ANWESHA CONSTRUCTION | 4.91 | 0.00 | 1 | |||
| 245 | Burdwan Division | Restoration of Pump House at Head Work site of BARWA Piped water supply scheme at Memari-II Block under Burdwan Division, Dist.-Purba Bardhaman | ORD/000133/2024-2025 | 1007/BSD | 06/06/2024 | 30 | I.S. ENTERPRISE | 0.97 | 0.00 | 100 | |||
| 246 | Burdwan Division | Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Anguna village of Anguna Piped Water Supply Scheme within Headquarters under Burdwan Division, PHE. Dte. [Phase - I] [GROUP : ¿1A¿] (Agreement no. 171/BWD of 2020-21) | ORD/000134/2020-2021 | 2698/BWD | 07/08/2020 | 30 | ANWESHA CONSTRUCTION | 4.91 | 0.00 | 1 | |||
| 247 | Burdwan Division | Making structure with GI pipe for provision of joining and laying of pipeline near Abhirampur branch Canal for Bhalki and its adjoining mouza's Piped W/S Scheme at Ausgram-II Block within Durgapur Sub Division under Burdwan Division, P.H.E. Dte. [Gr.-H] | ORD/000134/2022-2023 | 349/DSD | 30/06/2022 | 45 | PARTHA RAY | 1.90 | 0.00 | 1 | |||
| 248 | Burdwan Division | Improvement of 300cum. OHR (Concreting,Plastering,Primer and Painting) for Abujhati PWSS under Jamalpur Block under Burdwan Division PHE Dte. | ORD/000134/2024-2025 | 1015/BSD | 07/06/2024 | 45 | DEBASHISH ENTERPRISE | 2.01 | 0.00 | 0 | |||
| 249 | Burdwan Division | Continuation work order for Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Mugura village of Mugura Piped Water Supply Scheme within Headquarters under Burdwan Division, PHE. Dte. [Phase - I] [GROUP : ¿3A¿] (Agreement no. 163/BWD,2020-2021) | ORD/000135/2020-2021 | 3535/BWD | 25/09/2020 | 30 | LAKSHMIKANTA DAS | 2.69 | 2.69 | 1 | |||
| 250 | Burdwan Division | Making Connection with Rising Main And Over Head Reservoir of Golgram W/S Scheme within Durgapur Sub-Division in Galsi-I Block under Burdwan Division, P.H.E. Dte. [Gr.-G] | ORD/000135/2022-2023 | 348/DSD | 30/06/2022 | 15 | RANADHIR SINHA | 0.33 | 0.00 | 1 | |||
| 251 | Burdwan Division | Providing FHTC in the left out portion of Natungram, Kutirdanga, Kharinan village along with other ancillary work in order to declare Sajal Gram under the command area of NANDAI PWSS (SM/08104) within Kalna Sub Division under Burdwan Division, PHE. Dte. | ORD/000135/2025-2026 | 1447/BWD | 22/05/2025 | 120 | MUKHERJEE ENTERPRISE | 42.77 | 0.00 | 0 | |||
| 252 | Burdwan Division | Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Jagarpur & Mugura village of Mugura Piped Water Supply Scheme within Headquarters under Burdwan Division, PHE. Dte. [Phase - I] [GROUP : ¿3B¿] (Agreement no.238/BWD of 2020-21) | ORD/000136/2020-2021 | 4118/BWD | 16/10/2020 | 30 | HAFIJUR RAHAMAN MIDYA | 4.92 | 4.86 | 1 | |||
| 253 | Burdwan Division | Construction of Temporary Approach road to HW site for Augmentation of Amarun (Zone-II ) Piped water supply Scheme , P.H.E Dte. Block:-Bhatar, Dist: Purba Bardhaman. [Gr.-F] | ORD/000136/2022-2023 | 347/DSD | 30/06/2022 | 21 | M/S S. CHOUDHURY | 1.04 | 0.00 | 100 | |||
| 254 | Burdwan Division | Laying of distribution system of different damaged section at Begut, Nabastha & Palsha village regarding smooth running FHTC work within Nabastha PWSS, Bardhhaman-II Development Block under Burdwan Division, PHE Dte. | ORD/000136/2023-2024 | 784/BSD | 28/04/2023 | 30 | D.M. ENTERPRISE | 0.95 | 0.00 | 100 | |||
| 255 | Burdwan Division | Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Bundebaj (Pt-A) village of Bundebaj Piped Water Supply Scheme within Kalna Sub-Divn. under Burdwan Division, PHE. Dte. [Phase - I] [Sl.No : 8A] (T.R. No. 320/BWD/2020-21) | ORD/000137/2020-2021 | 2586/BWD | 04/08/2020 | 30 | MOMINUL ISLAM MONDAL | 4.92 | 4.92 | 1 | |||
| 256 | Burdwan Division | Continuation work order for Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Banki village and Banki habitation of Bamungoria Piped Water Supply Scheme within Kalna Sub-Divn. under Burdwan Division, PHE. Dte. [Phase - I] [GROUP : ¿10B¿] | ORD/000137/2021-2022 | 4543/BWD | 06/09/2021 | 30 | GOUTAM KUMAR MITRA | 0.97 | 0.00 | 1 | |||
| 257 | Burdwan Division | Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Bundebaj (Pt-B) village of Bundebaj Piped Water Supply Scheme within Kalna Sub-Divn. under Burdwan Division, PHE. Dte. [Phase - I] [Sl.No : 8B] (T.R. no. 377/BWD/2020-21) | ORD/000138/2020-2021 | 2591/BWD | 04/08/2020 | 30 | MAA LAXMI ENTERPRISE | 4.92 | 4.92 | 1 | |||
| 258 | Burdwan Division | Laying of distribution system of different damaged section at Chakundi & Saligram village regarding smooth running FHTC work within Nabastha PWSS, Bardhhaman II Development Block under Burdwan Division, PHE Dte. | ORD/000138/2023-2024 | 787/BSD | 28/04/2023 | 30 | D.M. ENTERPRISE | 0.97 | 0.00 | 100 | |||
| 259 | Burdwan Division | Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Jaggeswardihi village of Jaggeswardihi Piped Water Supply Scheme within Katwa Sub-Divn. under Burdwan Division, PHE. Dte. [Phase - I] [SL. No : 9A] (T.R. No.-219/BWD/2020-21) | ORD/000139/2020-2021 | 2630/BWD | 04/08/2020 | 30 | ABDUL HAI | 4.92 | 0.00 | 1 | |||
| 260 | Burdwan Division | Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of Natungram Piped Water Supply Scheme at Amar (6 Nos Habitation Part), Natungram (4 Nos Habitation Part) & Bohar Village (Mouza), Bardhaman-I Block under Burdwan Division, PHE Dte.(Agreement No. 73/2020-2021 OF SE/CC/PHE. DTE.) | ORD/000140/2020-2021 | 7052/BWD | 22/12/2020 | 90 | HAMID SK | 48.20 | 41.40 | 1 | |||
| 261 | Burdwan Division | Extension of pipe line from the existing Distribution System within scheme jurisdiction at Enayatpur and Sankhai village under UDDHARANPUR PWSS under Katwa Sub-Division under Burdwan Division PHE Dte. (Sl No-1) | ORD/000140/2021-2022 | 589/KTS | 06/09/2021 | 30 | M/S S. CHOUDHURY | 4.85 | 0.00 | 1 | |||
| 262 | Burdwan Division | Extension of pipe line from the existing Distribution System within scheme jurisdiction at Uddharanpur village under UDDHARANPUR PWSS under Katwa Sub-Division under Burdwan Division PHE Dte.(Sl No-2) | ORD/000141/2021-2022 | 590/KTS | 06/09/2021 | 30 | M/S S. CHOUDHURY | 4.83 | 0.00 | 1 | |||
| 263 | Burdwan Division | Extension of pipe line from the existing Distribution System within scheme jurisdiction at Naihati village under UDDHARANPUR PWSS under Katwa Sub-Division under Burdwan Division PHE Dte. (Sl No-3) | ORD/000142/2021-2022 | 591/KTS | 06/09/2021 | 30 | M/S S. CHOUDHURY | 4.83 | 0.00 | 1 | |||
| 264 | Burdwan Division | Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Sahapur (Pt-A) village of Sahapur Piped Water Supply Scheme within Katwa Sub-Divn. under Burdwan Division, PHE. Dte. [Phase - I] [SL.No : 11A] (Agreement no. 500/BWD of 2020-21) | ORD/000143/2020-2021 | 2608/BWD | 04/08/2020 | 30 | RAINBOW CONSTRUCTION | 4.92 | 4.92 | 1 | |||
| 265 | Burdwan Division | Replacement and extension of pipe line from the existing Distribution System within scheme jurisdiction at Sahebnagar village under AGRADWIP PWSS under Katwa Sub-Division under Burdwan Division PHE Dte.(Sl No-4) | ORD/000143/2021-2022 | 592/KTS | 06/09/2021 | 30 | TAPAS KUMAR ROY | 4.84 | 0.00 | 1 | |||
| 266 | Burdwan Division | Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Sahapur (Pt-A) village of Sahapur Piped Water Supply Scheme within Katwa Sub-Divn. under Burdwan Division, PHE. Dte. [Phase - I] [SL.No : 11A] (Agreement no.505/BWD of 2020-21) | ORD/000144/2020-2021 | 2607/BWD | 04/08/2020 | 30 | DUBE ENTERPRISE | 4.92 | 4.92 | 1 | |||
| 267 | Burdwan Division | Replacement and extension of pipe line from the existing Distribution System within scheme jurisdiction at Agradwip Gopinath para and Majherpara village under AGRADWIP PWSS under Katwa Sub-Division under Burdwan Division PHE Dte.(Sl No-5) | ORD/000144/2021-2022 | 593/KTS | 06/09/2021 | 30 | CHANCHAL PAL | 3.47 | 0.00 | 1 | |||
| 268 | Burdwan Division | Providing left out FHTC for Putunda village within SUHARI PWSS , Bardhhaman-II Development Block under Burdwan Division, PHE Dte | ORD/000144/2024-2025 | 1032/BSD | 10/06/2024 | 30 | ISHAN CONSTRUCTION | 0.96 | 0.00 | 100 | |||
| 269 | Burdwan Division | Continuation work order for Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Sahapur (Pt-A) village of Sahapur Piped Water Supply Scheme within Katwa Sub-Divn. under Burdwan Division, PHE. Dte. [Phase - I] [SL.No : ¿11A¿] (Agreement no.-501/BWD of 2020-21) | ORD/000145/2020-2021 | 4083/BWD | 16/10/2020 | 30 | RAINBOW CONSTRUCTION | 2.23 | 2.23 | 1 | |||
| 270 | Burdwan Division | Replacement and extension of pipe line from the existing Distribution System within scheme jurisdiction at Agradwip Ghosh para village under AGRADWIP PWSS under Katwa Sub-Division under Burdwan Division PHE Dte.(Sl No-6) | ORD/000145/2021-2022 | 594/KTS | 06/09/2021 | 30 | SHUBHRA KANTI GHOSH | 3.56 | 0.00 | 1 | |||
| 271 | Burdwan Division | Continuation work order for Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Sahapur (Pt-B) village of Sahapur Piped Water Supply Scheme within Katwa Sub-Divn. under Burdwan Division, PHE. Dte. [Phase - I] [SL.No : ¿11B¿](Agreement no.-497/BWD of 2020-21) | ORD/000146/2020-2021 | 4913/BWD | 08/12/2020 | 30 | DUBE ENTERPRISE | 2.84 | 0.00 | 1 | |||
| 272 | Burdwan Division | Construction of Pump House cum chlorine room without sanitary and water supply arrangement at Head Work Site to departmental drawing (Size 3.60 mtr x 3.00 mtr room) for SUDPUR water supply schemes under Katwa Sub-Division within Burdwan Division, PHE Dte.(Sl No-7) | ORD/000146/2021-2022 | 595/KTS | 06/09/2021 | 45 | BABUL SK | 2.99 | 0.00 | 1 | |||
| 273 | Burdwan Division | Construction of concrete road and rest portion of boundary wall at Head works site of AMRA Piped Water Supply Scheme in Jamalpur Block under Burdwan Division, PHE Dte. (Length - 122 Mtr., 45 Nos Column). | ORD/000146/2022-2023 | 3100/BWD | 14/07/2022 | 30 | CHAUDHURI ENTERPRISE | 7.68 | 0.00 | 0 | |||
| 274 | Burdwan Division | Providing Functional Household Tap connection (FHTC) from existing distribution system within the command area of Ramkrishnapur piped water supply scheme at Jamui, Fakirpur, Khemta, Ramkrishnapur & Chandipur village (Mouza), Raina-I Block under Burdwan Division, PHE Dte. | ORD/000147/2021-2022 | 4217/BWD | 16/08/2021 | 45 | GHOSH CONCERN | 36.49 | 0.00 | 1 | |||
| 275 | Burdwan Division | Providing Functional Household Tap Connection(FHTC) from existing distribution system within the command area of BAGILA Piped Water Supply Scheme at Kiskinda (2 nos Hab), Krishnapur, Talchini & Bagila (Part) Village (Mouza), Memari-I Block under Burdwan Division, PHE Dte. | ORD/000149/2021-2022 | 4659/BWD | 10/09/2021 | 60 | HAMID SK | 60.69 | 0.00 | 1 | |||
| 276 | Burdwan Division | Continuation work order for Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Saktigarh (Pt-A) village of Shaktigarh Piped Water Supply Scheme within Burdwan Sub-Divn. under Burdwan Division, PHE. Dte. [Phase - I] [GROUP : ¿8A¿] (T.R. No. 428/BWD/2020-21) | ORD/000150/2020-2021 | 3801/BWD | 08/10/2020 | 30 | SARKAR AGENCY | 4.92 | 4.92 | 1 | |||
| 277 | Burdwan Division | Laying of UPVC pipeline & providing FHTC work at Bamunpara, Sahajadpur, Tentulia & Gulita village of BAMUNPARA Water Supply Scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. | ORD/000150/2023-2024 | 2423/BWD | 30/05/2023 | 30 | GOUTAM KUMAR MITRA | 9.65 | 0.00 | 100 | |||
| 278 | Burdwan Division | Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Saktigarh (Pt-B) village of Shaktigarh Piped Water Supply Scheme within Burdwan Sub-Divn. under Burdwan Division, PHE. Dte. [Phase - I] [GROUP : ¿8B¿] (T.R. No.-380/BWD/2020-21) | ORD/000151/2020-2021 | 2742/BWD | 10/08/2020 | 30 | T.K. BANERJEE & CO. | 4.91 | 4.91 | 1 | |||
| 279 | Burdwan Division | Sinking of 250 X 150mm dia Tube Well 150 mtr. Depth by D.R. Rig method using UPVC pipe (CD) and UPVC Deep Well Screen (RDS) for Aug. of BAIDYAPUR (Z-I) PWSS, Block - Kalna - II and NANDAI PWSS, Block - Kalna - I Piped Water Supply Scheme, Dist - Purba Bardhaman under Burdwan Division, PHE Dte. [For 02 Nos. Tube well]. | ORD/000151/2023-2024 | 2424/BWD | 30/05/2023 | 45 | KOUSIK MALLICK | 19.84 | 0.00 | 100 | |||
| 280 | Burdwan Division | Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Hatgobindapur village of Hatgobindapur Piped Water Supply Scheme within Burdwan Sub-Divn. under Burdwan Division, PHE. Dte. [Phase - I] [GROUP : ¿6A¿] (T.R. No. 156/BWD/2020-21) | ORD/000152/2020-2021 | 2743/BWD | 10/08/2020 | 30 | M/S ASHA CONSTRUCTION | 4.92 | 4.92 | 1 | |||
| 281 | Burdwan Division | Providing Functional House hold Tap connection (FHTC) from existing distribution system within the command area of NATUNGRAM piped water supply scheme at Natungram village under Bardhaman-I Block under Burdwan Division, PHE Dte.[Gr.-C] | ORD/000152/2021-2022 | 687/BSD | 09/06/2021 | 30 | HAMID SK | 2.95 | 2.91 | 1 | |||
| 282 | Burdwan Division | Augmentation of SONARUDRA PWSS to accommodate FHTC, Laying Distribution System, Laying Rising Main, under Jal Jivan Mission of Purbasthali - I Block, Purba Burdwan District under Burdwan Division, PHE. Dte. | ORD/000152/2023-2024 | 2442/BWD | 30/05/2023 | 60 | ROHAN MONDAL | 43.32 | 0.00 | 20 | |||
| 283 | Burdwan Division | Providing 19 Nos. FHTC at ISHUFABAD & GRAMGORIA village for declaration of SWAJALGRAM under ISHUFABAD Piped Water Supply Scheme, Block- Burdwan-I within Burdwan Sub Division under Burdwan Division PHE Dte | ORD/000152/2024-2025 | 1037/BSD | 10/06/2024 | 30 | DEBASHISH ENTERPRISE | 0.91 | 0.00 | 0 | |||
| 284 | Burdwan Division | Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Banagram village of Hatgobindapur Piped Water Supply Scheme within Burdwan Sub-Divn. under Burdwan Division, PHE. Dte. [Phase - I] [GROUP : ¿6B¿] (T.R. No.-155/BWD/2020-21) | ORD/000153/2020-2021 | 2744/BWD | 10/08/2020 | 30 | M/S ASHA CONSTRUCTION | 4.92 | 0.00 | 1 | |||
| 285 | Burdwan Division | Additional work providing Functional Household Tap connection (FHTC) from existing distribution system within the command area of Palla piped water supply scheme at Palla village (Mouza) Memari-I Block under Burdwan Division, PHE Dte. [Gr.-F] | ORD/000153/2021-2022 | 685/BSD | 09/06/2021 | 30 | S.C. ENTERPRISE | 0.77 | 0.76 | 1 | |||
| 286 | Burdwan Division | Providing left out FHTC for 100% coverage in different village within PALSIT PWSS, Bardhhaman-II Development Block under Burdwan Division, PHE Dte | ORD/000153/2024-2025 | 1038/BSD | 10/06/2024 | 30 | M/S PALASH BISWAS | 0.95 | 0.00 | 100 | |||
| 287 | Burdwan Division | Extension and replacement of pipe line from the existing Distribution System within scheme jurisdiction at Mongalkote village under Mongalkote PWSS under Mongalkote Block within Katwa Sub-Division under Burdwan Division PHE Dte. [Sl No-02] | ORD/000154/2022-2023 | 438/KTS | 27/06/2022 | 30 | NANGTASWAR CO. OP. LABOUR CONT. AND CONSTRUCTION SOCIETY LTD. | 4.75 | 0.00 | 1 | |||
| 288 | Burdwan Division | Extension and replacement of pipe line from the existing Distribution System within scheme jurisdiction at Mongalkote village under Mongalkote PWSS under Mongalkote Block within Katwa Sub-Division under Burdwan Division PHE Dte. [Sl No-03] | ORD/000155/2022-2023 | 439/KTS | 27/06/2022 | 30 | NANGTASWAR CO. OP. LABOUR CONT. AND CONSTRUCTION SOCIETY LTD. | 1.38 | 0.00 | 1 | |||
| 289 | Burdwan Division | Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of Maheshdanga Piped Water Supply Scheme at Salda Village (2 Nos. habitations) & Bahara Village (5 Nos. habitations), Jamalpur Block under Burdwan Division, PHE Dte. | ORD/000156/2021-2022 | 4634/BWD | 09/09/2021 | 60 | CREATION CONSTRUCTION | 52.73 | 0.00 | 1 | |||
| 290 | Burdwan Division | Replace Damaged & deface FHTC(By WBSRDA)with all with accessories within the command area of SAHHOSENPUR Piped W/S Scheme at SahhosenpurSaikh Para and Rajarampur village,Jamalpur Development Block under Burdwan Division,PHE Dte. | ORD/000156/2024-2025 | 1045/BSD | 10/06/2024 | 30 | SARKAR CONSTRUCTION | 0.83 | 0.00 | 100 | |||
| 291 | Burdwan Division | Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of LOHAI Piped Water Supply Scheme at Madhabdihi, Bhanjanpur, Akhina & Dakhin Gopalpur Village (Mouza), Raina-II Block under Burdwan Division, PHE Dte. | ORD/000157/2021-2022 | 4635/BWD | 09/09/2021 | 60 | CREATION CONSTRUCTION | 61.85 | 0.00 | 1 | |||
| 292 | Burdwan Division | Supplying and laying of valves along with construction of valve chamber at the existing distribution pipe line of Agradwip PWSS under Katwa Sub-Division under Burdwan Division, PHE Dte [Sl No-04] | ORD/000157/2022-2023 | 440/KTS | 27/06/2022 | 30 | TAPAS KUMAR ROY | 0.78 | 0.00 | 1 | |||
| 293 | Burdwan Division | Augmentation of MANIKHAR PWSS to accommodate FHTC, Laying Distribution System, Laying Rising Main, under Jal Jeevan Mission of Kalna - I Block, Purba Burdwan District under Burdwan Division, PHE. Dte. | ORD/000157/2023-2024 | 2453/BWD | 31/05/2023 | 60 | SETH ENTERPRISE | 34.49 | 0.00 | 100 | |||
| 294 | Burdwan Division | Extension of pipe line from the existing Distribution System within scheme jurisdiction at Gopalbera village under KASIYARA PWSS under Katwa Sub-Division under Burdwan Division PHE Dte. [Sl - 1] | ORD/000158/2021-2022 | 661/KTS | 28/09/2021 | 15 | MAJUMDER ENTERPRISE | 1.26 | 0.00 | 1 | |||
| 295 | Burdwan Division | Supplying and laying of valves along with construction of valve chamber at the existing distribution pipe line of Sudpur PWSS under Katwa Sub-Division under Burdwan Division, PHE Dte [Sl No-05] | ORD/000158/2022-2023 | 441/KTS | 27/06/2022 | 30 | MD HASIN | 0.86 | 0.00 | 1 | |||
| 296 | Burdwan Division | Extension of pipe line from the existing Distribution System within scheme jurisdiction at Kasiyara and Dirghyasoya village under KASIYARA PWSS under Katwa Sub-Division under Burdwan Division PHE Dte. [Sl - 2] | ORD/000159/2021-2022 | 662/KTS | 28/09/2021 | 15 | MAJUMDER ENTERPRISE | 4.56 | 0.00 | 1 | |||
| 297 | Burdwan Division | Supplying, laying and commissioning of Rising main at pump no. - 1 of Panuhat Piped Water Supply Scheme under Katwa Sub-Division under Burdwan Division, PHE Dte. [Sl No-06] | ORD/000159/2022-2023 | 443/KTS | 27/06/2022 | 30 | HAMID SK | 2.27 | 0.00 | 1 | |||
| 298 | Burdwan Division | Extention of pipe line for providing FHTC from existing Distribuation System within scheme jurisdiction in Kashiara Piped Water Supply Scheme at Gotishta Village within Katwa Sub-Division under Burdwan Division PHE Dte. (Sl -3) | ORD/000160/2021-2022 | 663/KTS | 28/09/2021 | 15 | MAJUMDER ENTERPRISE | 4.84 | 0.00 | 1 | |||
| 299 | Burdwan Division | Extension of uPVC pipeline regarding FHTC for Gureghar, Dumo, Basantabati habitation under Madhabpur (Zone-II) W/S. Scheme at Jamalpur Development Block under Burdwan Division, PHE Dte. | ORD/000160/2022-2023 | 3139/BWD | 19/07/2022 | 30 | PRATIMA CONSTRUCTION | 5.64 | 0.00 | 1 | |||
| 300 | Burdwan Division | Interconnection in distribution system from OHR to in between 1st and 2nd Tube Well site for smooth functioning of FHTC work of MAJHERGRAM W/S Scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. | ORD/000160/2023-2024 | 2575/BWD | 01/06/2023 | 30 | TULIP ENGINEERS CO-OPERATIVE SOCIETY LTD. | 22.54 | 0.00 | 100 | |||
| 301 | Burdwan Division | Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Kailaspur Habitation of Kenna Piped Water Supply Scheme within Burdwan Sub-Divn. under Burdwan Division, PHE. Dte. [GROUP : ¿L¿] (T.R. No. 201/BWD of 2020-2021) | ORD/000161/2020-2021 | 2399/BWD | 20/07/2020 | 30 | BRINDABAN KONAR | 4.92 | 4.92 | 1 | |||
| 302 | Burdwan Division | Supplying, laying and commissioning of Rising main at pump no. - 2 of Srikhanda PWSS under Katwa Sub-Division under Burdwan Division, PHE Dte. [Sl No-07] | ORD/000161/2022-2023 | 444/KTS | 27/06/2022 | 30 | ASHOK KUMAR GHOSH | 1.84 | 0.00 | 1 | |||
| 303 | Burdwan Division | Laying of UPVC pipeline & providing FHTC work at Dhanyakherur, Majhergram bazar & Hattola village of MAJHERGRAM Water Supply Scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. | ORD/000161/2023-2024 | 2456/BWD | 31/05/2023 | 30 | PRONAB KUMAR DEY | 9.68 | 0.00 | 100 | |||
| 304 | Burdwan Division | Continuation work order for Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Kailaspur Habitation of Kenna Piped Water Supply Scheme within Burdwan Sub-Divn. under Burdwan Division, PHE. Dte. [GROUP : ¿L¿] (T.R. No. 248/BWD of 2020-2021) | ORD/000162/2020-2021 | 3517/BWD | 25/09/2020 | 30 | BRINDABAN KONAR | 4.92 | 4.92 | 1 | |||
| 305 | Burdwan Division | Connection of CGWB Tube well Raising Main Line of Head Work Site of Kashiyara Piped Water Supply Scheme within Katwa Sub-Division under Burdwan Division, P.H.E. Dte. (Sl No-1) | ORD/000162/2021-2022 | 635/KTS | 20/09/2021 | 15 | ASMA ENTERPRISE | 0.92 | 0.00 | 1 | |||
| 306 | Burdwan Division | Providing FHTC from existing distribution pipe line system within command area of Nabastha Piped W/S. Scheme at Chakundi- Mouza, Bardhaman-II Development Block under Burdwan Division, PHE Dte. | ORD/000162/2022-2023 | 3138/BWD | 19/07/2022 | 30 | BABUL SK | 11.86 | 0.00 | 1 | |||
| 307 | Burdwan Division | Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Mahachanda village and Mahachanda habitation of MAHACHANDA piped water supply scheme within Durgapur (Bardhaman North) Sub-Division under Burdwan Division, PHE Dte. [Phase-I](Tr No.-527/BWD/2020-21) | ORD/000163/2020-2021 | 3343/BWD | 18/09/2020 | 30 | BIPLAB SAMANTA | 4.86 | 4.86 | 1 | |||
| 308 | Burdwan Division | Continuation work order for Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Mahachanda village and Mahachanda habitation of MAHACHANDA piped water supply scheme within Durgapur (Bardhaman North) Sub-Division under Burdwan Division, PHE Dte. (Tr No.-528/BWD/20-21) | ORD/000164/2020-2021 | 4270/BWD | 03/11/2020 | 30 | BIPLAB SAMANTA | 4.86 | 4.86 | 1 | |||
| 309 | Burdwan Division | Laying pipeline with FHTC for KAMARHATI Zone -II Water Supply Scheme at Kamarhati village (95 Nos.), Barati village (155 Nos.), Baidyapur village (110 Nos.), Jashapur village (125 Nos.) of Raina-II Block under Burdwan Division, PHE Dte. | ORD/000164/2022-2023 | 3166/BWD | 21/07/2022 | 45 | ANWESHA CONSTRUCTION | 31.48 | 0.00 | 1 | |||
| 310 | Burdwan Division | Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Gureghar village and Gureghar habitation of Madhabpur piped water supply scheme within Burdwan Sub-Division under Burdwan Division, PHE Dte. [Phase-I](Tr No.-440/BWD/2020-21) | ORD/000165/2020-2021 | 3332/BWD | 18/09/2020 | 30 | KAUSHIK RAY | 4.87 | 4.87 | 1 | |||
| 311 | Burdwan Division | Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Nunari village and Bandh-O-Tawra & Nunari habitation of MAHACHANDA piped water supply scheme within Durgapur (Bardhaman North) Sub-Division under Burdwan Division, PHE Dte. [Phase-I](Tr No.-529/BWD/2020-21) | ORD/000166/2020-2021 | 3344/BWD | 18/09/2020 | 30 | PAPRI HAZRA | 4.86 | 4.86 | 1 | |||
| 312 | Burdwan Division | Providing 22 Nos.FHTC at IDILPUR & FAKIRPUR village for declearation of SWAJALGRAM under FAKIRPUR Piped Water Supply Scheme, Block- Burdwan-I within Burdwan Sub Division under Burdwan Division PHE Dte. | ORD/000166/2024-2025 | 1035/BSD | 10/06/2024 | 30 | IMPULSE INTERNATIONAL | 0.75 | 0.00 | 0 | |||
| 313 | Burdwan Division | Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Abujhati village of Abujhati piped water supply scheme within Burdwan Sub-Division under Burdwan Division, PHE Dte. [Phase-I](Tr No.-312/BWD/2020-21) | ORD/000167/2020-2021 | 2739/BWD | 10/08/2020 | 30 | INDRAJIT MONDAL | 4.92 | 4.92 | 1 | |||
| 314 | Burdwan Division | Functional Household Tap Connection (FHTC) at Baratikra village within the command area of Antpara Piped Water Supply Scheme at Jamalpur Block under Burdwan Division, PHE Dte. (Part-A). | ORD/000167/2021-2022 | 1858/AE/HQ | 05/10/2021 | 30 | J. K. CORPORATION | 4.83 | 0.00 | 1 | |||
| 315 | Burdwan Division | Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Ajhapur village of Abujhati piped water supply scheme within Burdwan Sub-Division under Burdwan Division, PHE Dte. [Phase-I](Tr No.-331/BWD/2020-21) | ORD/000168/2020-2021 | 2748/BWD | 10/08/2020 | 30 | E-WORLD | 4.92 | 4.92 | 1 | |||
| 316 | Burdwan Division | Providing Functional Household Tap Connection (FHTC) at Baratikra village within the command area of Antpara Piped Water Supply Scheme at Jamalpur Block under Burdwan Division, PHE Dte. (Part-B). | ORD/000168/2021-2022 | 1859/AE/HQ | 05/10/2021 | 30 | INDRAJIT MONDAL | 4.83 | 0.00 | 1 | |||
| 317 | Burdwan Division | Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Bamangaria village and Bamangaria habitation of Bamangaria piped water supply scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. [Phase-I](Tr No.-536/BWD/2020-21) | ORD/000169/2020-2021 | 4122/BWD | 16/10/2020 | 30 | PAL CONSTRUCTION | 4.86 | 4.86 | 1 | |||
| 318 | Burdwan Division | Continuation work order for Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Nunari village and Bandh-O-Tawra & Nunari habitation of MAHACHANDA piped water supply scheme within Durgapur (Bardhaman North) Sub-Division under Burdwan Division, PHE Dte. [Phase-I](Tr No.-530/BWD/2020-21) | ORD/000170/2020-2021 | 4006/BWD | 14/10/2020 | 30 | PAPRI HAZRA | 4.79 | 4.79 | 1 | |||
| 319 | Burdwan Division | Continuation work order for Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Abujhati village of Abujhati piped water supply scheme within Burdwan Sub-Division under Burdwan Division, PHE Dte. [Phase-I](Tr No.-456/BWD/2020-21) | ORD/000171/2020-2021 | 3740/BWD | 07/10/2020 | 30 | INDRAJIT MONDAL | 4.92 | 4.92 | 1 | |||
| 320 | Burdwan Division | Continuation work order for Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Ajhapur village of Abujhati piped water supply scheme within Burdwan Sub-Division under Burdwan Division, PHE Dte. [Phase-I](Tr No.-429/BWD/2020-21) | ORD/000172/2020-2021 | 3803/BWD | 08/10/2020 | 30 | E-WORLD | 4.92 | 4.92 | 1 | |||
| 321 | Burdwan Division | Additional extension UPVC distribution Pipeline in connection with FHTC work for Palsit Piped Water Supply Scheme at Khargram, Karanda, Palsit & Bhaita under Bardhaman- II Block under Burdwan Division, PHE Dte. | ORD/000172/2021-2022 | 6065/BWD | 07/10/2021 | 30 | BRINDABAN KONAR | 14.22 | 0.00 | 1 | |||
| 322 | Burdwan Division | Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Jarogram village and Jaragram habitation of Madhabpur piped water supply scheme within Burdwan Sub-Division under Burdwan Division, PHE Dte. [Phase-I](Tr No.-441/BWD/2020-21) | ORD/000173/2020-2021 | 3333/BWD | 18/09/2020 | 30 | SUPRIYA RAY | 4.87 | 4.87 | 1 | |||
| 323 | Burdwan Division | Water tap connection in each house hold from existing distribution system within scheme jurisdiction in SAHAPUR (Part-B) village of Sahapur piped water supply scheme within Katwa Sub-Division under Burdwan Division, PHE Dte. [Phase-I](Tr No.-494/BWD/2020-21) | ORD/000174/2020-2021 | 239/KTS | 30/09/2020 | 4 | DUBE ENTERPRISE | 1.42 | 1.41 | 1 | |||
| 324 | Burdwan Division | Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of NASARATPUR Piped Water Supply Scheme at Purbasthali-I Block under Burdwan Division, PHE Dte._2ND CALL. | ORD/000174/2021-2022 | 6079/BWD | 08/10/2021 | 60 | BRINDABAN KONAR | 54.89 | 0.00 | 1 | |||
| 325 | Burdwan Division | Providing FHTC & laying of HDPE pipe line for village of Madhyamgram, Dakshinpara, Binnerpar, Dhanyakherur of MAJHERGRAM PWSS of Manteswer Block under Burdwan Division, PHE Dte. | ORD/000174/2024-2025 | 2251/BWD | 18/06/2024 | 120 | A.R. TRADERS | 40.92 | 0.00 | 100 | |||
| 326 | Burdwan Division | Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Dirghapara village and Dirghapara (Part-B) habitation of Dirghapara piped water supply scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. [Phase-I](Tr No.-484/BWD/2020-21) | ORD/000175/2020-2021 | 4119/BWD | 16/10/2020 | 30 | SK NUR ALAM | 4.86 | 4.86 | 1 | |||
| 327 | Burdwan Division | Extension of pipeline including water tap connection (FHTC) at Pubar Vill [Kamalpur & Pubar (Part) Hab.] of PUBAR and its adjoining mouza's Piped W/S Scheme at Ausgram-II Block within Durgapur Sub Division under Burdwan Division, P.H.E. Dte._2ND CALL. | ORD/000175/2021-2022 | 6105/BWD | 08/10/2021 | 30 | ANWESHA CONSTRUCTION | 29.76 | 0.00 | 1 | |||
| 328 | Burdwan Division | Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Sahapur (Part-A) village of Sahapur piped water supply scheme within Katwa Sub-Division under Burdwan Division, PHE Dte. [Phase-I](Tr No.-503/BWD/20-21) | ORD/000176/2020-2021 | 238/KTS | 30/09/2020 | 4 | RAINBOW CONSTRUCTION | 1.45 | 1.45 | 1 | |||
| 329 | Burdwan Division | Extension of distribution main for providing FHTC at Kashipur Ramgere Adibasipara within Kashipur W/S Scheme in Bhatar Block under Burdwan Division, P.H.E. Dte. [Gr.-A] | ORD/000176/2021-2022 | 602/DSD | 07/10/2021 | 30 | THREE MAA ENTERPRISE | 4.82 | 0.00 | 1 | |||
| 330 | Burdwan Division | Providing 19 Nos. FHTC at DHOLAN & FAGUPUR village for declaration of SWAJALGRAM under ISHUFABAD Piped Water Supply Scheme, Block- Burdwan-I within Burdwan Sub Division under Burdwan Division PHE Dte. | ORD/000178/2024-2025 | 1036/BSD | 10/06/2024 | 30 | MUKHERJEE ENTERPRISES | 0.91 | 0.00 | 100 | |||
| 331 | Burdwan Division | Extension of distribution main for providing FHTC at Kashipur Ramgere Adibasipara within Kashipur W/S Scheme in Bhatar Block under Burdwan Division, P.H.E. Dte. [Gr.-A] | ORD/000182/2021-2022 | 619/DSD | 25/10/2021 | 30 | THREE MAA ENTERPRISE | 4.82 | 0.00 | 1 | |||
| 332 | Burdwan Division | Re-laying of UPVC Pipeline(Damaged by Irrigation Department)and repairing damaged FHTC at Masagram Mouza (Habitation) under Masagram Zone-I Piped Water Supply Scheme Jamalpur Development under Burdwan Division,PHE Dte. | ORD/000183/2023-2024 | 1007/BSD | 06/06/2023 | 15 | DEBASHISH ENTERPRISE | 0.85 | 0.00 | 100 | |||
| 333 | Burdwan Division | Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of Rayan Piped Water Supply Scheme at Rayan (Part) (Hatu Dewan(S), Kantai Krishnapur, Katwa Road, KhanPukur, Krishnapur, MadanSayar, Makumpara, Malikpara, Malir Bagan, Muchipara, Muslimpara & Narupara) Village (Mouza), Bardhaman-I Block under Burdwan Division, PHE Dte. | ORD/000191/2021-2022 | 3143/BWD | 04/06/2021 | 45 | S.R. ENTERPRISE | 49.27 | 0.00 | 1 | |||
| 334 | Burdwan Division | Different Types of work involved in connection with Augmentation of SONARUDRA (SM/16349) & KACHUA (SM/13497) Piped Water Supply Scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. | ORD/000192/2024-2025 | 2430/BWD | 27/06/2024 | 480 | R.G. INFRASTRUCTURE | 240.70 | 0.00 | 2 | |||
| 335 | Burdwan Division | Extension of pipeline including water tap connection (FHTC) at Pubar Vill [Kamalpur & Pubar (Part) Hab.] of PUBAR and its adjoining mouza's Piped W/S Scheme at Ausgram-II Block within Durgapur Sub Division under Burdwan Division, P.H.E. Dte._2ND CALL | ORD/000193/2021-2022 | 6104/BWD | 08/10/2021 | 30 | ANWESHA CONSTRUCTION | 29.76 | 0.00 | 1 | |||
| 336 | Burdwan Division | Continuation work order for Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Mirzapur village (Mirzapur habitation) of Madhabpur Piped Water Supply Scheme within Burdwan Sub-Divn. under Burdwan Division, PHE. Dte. [SL. No. : 10] | ORD/000194/2021-2022 | 6189/BWD | 28/10/2021 | 15 | JAI MAA DURGA & CO. | 2.19 | 0.00 | 1 | |||
| 337 | Burdwan Division | Laying of pipeline for providing FHTC 100% coverage and also construction & installation of Sluice Valve & Valve Chamber to control the flow of water, road restoration work etc. of different Piped W/S Schemes, Block Jamalpur under Burdwan Division, PHE Dte. | ORD/000194/2024-2025 | 2488/BWD | 01/07/2024 | 550 | M/S NATIONAL CONSTRUCTION | 480.97 | 0.00 | 80 | |||
| 338 | Burdwan Division | Continuation work order for Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Kharashgram (Part) village (Kharashgram (Part) habitation) of Dirghapara Piped Water Supply Scheme within Kalna Sub-Divn. under Burdwan Division, PHE. Dte. (Part - A) [Sl. No. : ¿10¿] | ORD/000197/2021-2022 | 6231/BWD | 01/11/2021 | 15 | HAFIJUR RAHAMAN MIDYA | 4.86 | 0.00 | 1 | |||
| 339 | Burdwan Division | Continuation work order for Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Kharashgram (Part) village (Kharashgram (Part) habitation) of Dirghapara Piped Water Supply Scheme within Kalna Sub-Divn. under Burdwan Division, PHE. Dte. (Part - B) [Sl. No. : ¿11¿] | ORD/000198/2021-2022 | 6232/BWD | 01/11/2021 | 15 | SK NUR ALAM | 4.86 | 0.00 | 1 | |||
| 340 | Burdwan Division | Continuation work order for Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Madanagar habitation of Madanagar piped water supply scheme within Burdwan Sub-Division under Burdwan Division, PHE Dte.(Tr No.-531/BWD/2020-21) | ORD/000199/2020-2021 | 3741/BWD | 07/10/2020 | 30 | PABITRA KUMAR SAMANTA | 4.92 | 4.92 | 1 | |||
| 341 | Burdwan Division | Supply of 10 mm NB Gun-metal Ferrul conforming to IS:2692-1989 for water tap connection in each house hold from existing distribution system within scheme jurisdiction in different piped water supply scheme within Durgapur (Bardhaman North) Sub-Division under Burdwan Division PHE Dte. and delivered at Barsul Divisional Store. [Part-6] | ORD/000199/2021-2022 | 3402/BWD | 24/06/2021 | 30 | A.K. SIKDAR | 91.80 | 81.31 | 1 | |||
| 342 | Burdwan Division | Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Rahatpur village and Rahatpur Habitation of Rahatpur piped water supply scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. [Phase-I](Tr No.-491/BWD/2020-21) | ORD/000200/2020-2021 | 4116/BWD | 16/10/2020 | 30 | DUBE ENTERPRISE | 4.87 | 4.87 | 1 | |||
| 343 | Burdwan Division | Sinking of 300 X 200mm dia Tube Well 150 mtr. Depth by D.R. Rig method using UPVC pipe (CD) and UPVC Deep Well Screen (RDS) for 3RD TW site of MADHABPUR (Z-I) W/S Scheme under Jamalpur Block within Burdwan Sub-Division, PHE Dte. | ORD/000201/2023-2024 | 2704/BWD | 08/06/2023 | 30 | TULIP ENGINEERS CO-OPERATIVE SOCIETY LTD. | 13.26 | 0.00 | 100 | |||
| 344 | Burdwan Division | Continuation work order for Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Nunari village (Patuna habitation) & Parhat village (Parhat habitation) of Mahachanda Piped Water Supply Scheme within Durgapur Sub-Divn. under Burdwan Division, PHE. Dte. (Part - B) [SL. No. : 04] | ORD/000202/2021-2022 | 6266/BWD | 02/11/2021 | 15 | PAPRI HAZRA | 4.86 | 0.00 | 1 | |||
| 345 | Burdwan Division | Continuation work order for Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Nunari village (Patuna habitation) & Parhat village (Parhat habitation) of Mahachanda Piped Water Supply Scheme within Durgapur Sub-Divn. under Burdwan Division, PHE. Dte. (Part - A) [SL. No. : 03] | ORD/000203/2021-2022 | 6265/BWD | 02/11/2021 | 15 | BIPLAB SAMANTA | 4.86 | 0.00 | 1 | |||
| 346 | Burdwan Division | Continuation work order for Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Adra village (Adrahati habitation) of ADRA Piped Water Supply Scheme within Durgapur Sub-Divn. under Burdwan Division, PHE. Dte. (Part - A) [SL. No. : 05] | ORD/000204/2021-2022 | 6264/BWD | 02/11/2021 | 15 | GENUINE ENGINEERING CO-OP. SOCIETY LTD. | 4.86 | 0.00 | 1 | |||
| 347 | Burdwan Division | Continuation work order for Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Kharashgram (Part) village (Kharashgram (Part) habitation) of Dirghapara Piped Water Supply Scheme within Kalna Sub-Divn. under Burdwan Division, PHE. Dte. (Part - C) [Sl. No. : ¿12¿] | ORD/000205/2021-2022 | 6401/BWD | 16/11/2021 | 15 | INVENT ENGINEERS CO. OPERATIVE SOCIETY LTD. | 4.84 | 0.00 | 1 | |||
| 348 | Burdwan Division | Extension of pipeline at Pratappur DANDA PARA, BATHAN PARA, BANGAL PARA, HINDU PARA & ADIBASI PARA of PRATAPPUR (ZONE-I) and its adjoining mouza's Piped W/S Scheme including water tap connection (FHTC) at Babuisol Vill (Goswamibandh Adibashipara Hab.), Kuldiha Vill (Adibashipara Hab.) Lachminnarayanpur Vill (2 Nos. Hab.), Pratappur Vill (2 Nos. Habs.), Radhaballabhpur Vill (1 No. Hab), Ramharipur Vill (2 Nos. Hab.) Radhamohanpur Vill. (1 No. Hab.) at Ausgram-II Block under Burdwan Division, PHE Dte._2ND CALL | ORD/000206/2021-2022 | 6393/BWD | 16/11/2021 | 60 | SAIKAT RAY | 44.09 | 0.00 | 1 | |||
| 349 | Burdwan Division | Extension of pipeline for Kenna Water Supply Scheme (Kenna, Dahura, Kailashpur, Dadur, Baral Village) within Memari - I Block including leftout household water tap connection (FHTC) under Burdwan Division, PHE Dte. | ORD/000207/2021-2022 | 6307/BWD | 09/11/2021 | 60 | T.K. BANERJEE & CO. | 41.46 | 0.00 | 1 | |||
| 350 | Burdwan Division | Extension of pipeline for CHHOTOBAINAN water supply scheme at Pahalanpur and Rupsara and Dakshin Mohonpur village within Raina-II Block under Burdwan Division, PHE Dte. [Gr.-E] | ORD/000212/2021-2022 | 988/BSD | 30/07/2021 | 30 | TIRUPATI ENTERPRISES | 4.82 | 3.35 | 1 | |||
| 351 | Burdwan Division | Providing FHTC (130 nos.) and Extension of UPVC dist. Pipeline at Noapara, Pirtala ,Nandra village of NANDRA water supply scheme at Burdwan-II Block under Burdwan Division PHE Dte..Gr. I | ORD/000213/2021-2022 | 1479/BSD | 09/11/2021 | 30 | BHARAT CONSTRUCTION | 4.81 | 0.00 | 1 | |||
| 352 | Burdwan Division | Water tap connection in each house hold from existing dist. System within Scheme jurisdiction in Katshimul village (Part) of Kamarhati (Zone-II) piped water supply scheme within Burdwan Sub-Division PHE Dte Part-A.Gr. D. | ORD/000214/2021-2022 | 1476/BSD | 09/11/2021 | 30 | MUNSHI JAVEDUR JAMAN | 4.83 | 0.00 | 1 | |||
| 353 | Burdwan Division | Water tap connection in each house hold from existing dist. System within Scheme jurisdiction in Katshimul village (Part) of Kamarhati (Zone-II) piped water supply scheme within Burdwan Sub-Division PHE Dte Part-B..Gr. E. | ORD/000215/2021-2022 | 1477/BSD | 09/11/2021 | 30 | DUBE ENTERPRISE | 4.83 | 0.00 | 1 | |||
| 354 | Burdwan Division | Continuation work order for Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Adra village (Adrahati habitation) of ADRA Piped Water Supply Scheme within Durgapur Sub-Divn. under Burdwan Division, PHE. Dte. (Part - C) [SL. No. : 07] | ORD/000216/2021-2022 | 6194/BWD | 28/10/2021 | 15 | LAKSHMIKANTA DAS | 4.86 | 0.00 | 1 | |||
| 355 | Burdwan Division | Laying of uPVC pipe for providing FHTC in different habitation of Lohai, Akhina and Dakshin Gopalpur Mouza within Lohai Piped Water Supply Scheme, Raina-II Block under Burdwan Division P.H.E DTE. [Group: ¿E¿] | ORD/000221/2021-2022 | 1816/AE/HQ | 21/09/2021 | 30 | M/S S. CHOUDHURY | 4.76 | 0.00 | 1 | |||
| 356 | Burdwan Division | Laying of uPVC pipeline due to obstruction arise for PWD roads within Gopikantapur W/S Scheme under Burdwan Division, PHE Dte. [Group: ¿F¿] | ORD/000222/2021-2022 | 1817/AE/HQ | 21/09/2021 | 30 | M/S S. CHOUDHURY | 3.55 | 0.00 | 1 | |||
| 357 | Burdwan Division | Laying of 75mm and 50mm dia. uPVC pipe for providing FHTC at different habitation of Paratal and Ruda Mouza within Hiranyagram Piped Water Supply Scheme, Jamalpur Block under Burdwan Division P.H.E DTE. [Group: ¿B¿] | ORD/000223/2021-2022 | 1818/AE/HQ | 21/09/2021 | 30 | APORUPA CONSTRUCTION | 4.74 | 0.00 | 1 | |||
| 358 | Burdwan Division | Construction of Retaining wall for protection of soil erosion at Headwork site (southern side) at Teandul PWSS under Burdwan Division, PHE Dte. [Group: ¿H¿] | ORD/000224/2021-2022 | 1902/AE/HQ | 16/11/2021 | 30 | ASHOK KUMAR GHOSH | 4.50 | 0.00 | 1 | |||
| 359 | Burdwan Division | Laying of HDPE pipe for providing FHTC in different habitation of Shura Mouza within Shura Piped Water Supply Scheme (Zone-I), Jamalpur Block under Burdwan Division, P.H.E DTE. [Group: ¿A¿] | ORD/000225/2021-2022 | 1815/AE/HQ | 21/09/2021 | 30 | SUKALPA NIRMAN | 4.79 | 0.00 | 1 | |||
| 360 | Burdwan Division | Arrangement of drinking water supply by installation of solar submersible pump including sinking of 200 mm. dia. Tube well 150 Mtr. Deep by direct rotary rig method, Laying dist. System, FHTC for Nunari Village under MAHACHANDA Piped W/S. Scheme, Block Bhatar under Burdwan Division, PHE Dte. | ORD/000225/2024-2025 | 2525/BWD | 03/07/2024 | 120 | THE BUSINESS ENGINEERS INDIA | 28.00 | 0.00 | 25 | |||
| 361 | Burdwan Division | Laying of uPVC pipe for providing FHTC at Jorbandh habitation of Kanshra Mouza within Kanshra Piped Water Supply Scheme, Jamalpur Block under Burdwan Division P.H.E DTE. [Group: ¿C¿] | ORD/000226/2021-2022 | 1898/AE/HQ | 16/11/2021 | 30 | M/S ANAND CONSTRUCTION | 4.62 | 0.00 | 1 | |||
| 362 | Burdwan Division | Providing Functional Household Tap Connection (FHTC) from existing distribution system at leftout area of Chakdighi Gram Panchayat within the command area of SHURA ZONE-I Piped Water Supply Scheme at Jamalpur Block under Burdwan Division, PHE Dte. GROUP : C | ORD/000229/2022-2023 | 426/AE/HQ | 03/08/2022 | 30 | D.M. ENTERPRISE | 3.25 | 0.00 | 1 | |||
| 363 | Burdwan Division | Construction of Path way, Drain, Vertical Extension of valve chamber & repairing of OHR connection etc. including shifting of damage pipeline at Head work site of TAKIPUR water supply scheme, Block-Ausgram-II within Durgapur (Bardhaman North) Sub-Division under Burdwan Division, PHE Dte. [Gr.-H] | ORD/000230/2021-2022 | 662/DSD | 22/11/2021 | 30 | PAL CONSTRUCTION | 4.02 | 0.00 | 1 | |||
| 364 | Burdwan Division | Extension of pipeline including leftout Functional Household Tap Connection (FHTC) for Mahishgoria Piped Water Supply Scheme at Mahishgoria, Bidyabatipur, Narayanpur village in Jamalpur Block under Burdwan Division, PHE Dte. GROUP : D | ORD/000230/2022-2023 | 427/AE/HQ | 03/08/2022 | 30 | A R TRADERS | 4.91 | 0.00 | 1 | |||
| 365 | Burdwan Division | Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of Kamarhati Z-II Piped Water Supply Scheme at Gotan, Kamarhati & Jashapur Village (Mouza), Raina-II Block under Burdwan Division, PHE Dte. | ORD/000235/2021-2022 | 6535/BWD | 24/11/2021 | 60 | KOUSIK MALLICK | 71.10 | 0.00 | 1 | |||
| 366 | Burdwan Division | Different types of works involve in connection with Augmentation of KULTI (SM/16301) Water Supply Scheme, Block Kalna II under Burdwan Division, PHE Dte. | ORD/000235/2024-2025 | 2553/BWD | 04/07/2024 | 240 | HAMID SK | 222.11 | 0.00 | 80 | |||
| 367 | Burdwan Division | Extension of pipe line from the existing Distribution System within scheme jurisdiction at Paschim Gopalpur & Mirapur village under Paschim Gopalpur PWSS under Katwa Sub-Division under Burdwan Division PHE Dte. (Sl No-1) | ORD/000236/2021-2022 | 698/KTS | 27/10/2021 | 15 | ASMA ENTERPRISE | 1.06 | 0.00 | 1 | |||
| 368 | Burdwan Division | Providing Functional Household Tap Connection from existing distribution system within the command area of AGRADWIP PWSS under Katwa Sub-Division under Burdwan Division PHE Dte. (Sl No-1) | ORD/000237/2021-2022 | 688/KTS | 08/10/2021 | 7 | CHANCHAL PAL | 1.21 | 0.00 | 1 | |||
| 369 | Burdwan Division | Providing Functional Household Tap Connection from existing distribution system within the command area of Akaihat and Bikihat PWSS under Katwa Sub-Division under Burdwan Division PHE Dte. (Sl No-1) | ORD/000238/2021-2022 | 750/KTS | 24/11/2021 | 15 | JAI MAA DURGA & CO. | 2.54 | 0.00 | 1 | |||
| 370 | Burdwan Division | Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Mohara vilage (Mohara habitation) of ADRA Piped W/S Scheme within Durgapur (Bardhaman North) Sub-Division under Burdwan Division, P.H.E. Dte. [Gr.-E] | ORD/000241/2021-2022 | 673/DSD | 29/11/2021 | 21 | KOUSIK MALLICK | 4.83 | 0.00 | 1 | |||
| 371 | Burdwan Division | Replacement of damage A.C. Pipeline from Mankar Dani Pukur to Purbasa colony via Post Office & Annapurnatala to Panchakalitala under Mankar (Zone-II) Piped Water Supply Scheme under Galsi-I Block within Durgapur (Burdwan North) Sub Division under Burdwan Division, P.H.E. Dte._2ND CALL. | ORD/000242/2021-2022 | 6633/BWD | 29/11/2021 | 30 | PREMANANDA ROY BISWAS | 11.43 | 0.00 | 1 | |||
| 372 | Burdwan Division | Continuation work order for Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Jaggeswardihi (Part) village of Jaggeswardihi piped water supply scheme within Katwa Sub-Division under Burdwan Division, PHE Dte. [Phase-I](Tr No.-251/BWD/2020-21) | ORD/000243/2020-2021 | 3383/BWD | 22/09/2020 | 30 | SUBRATA GUPTA | 4.92 | 4.92 | 1 | |||
| 373 | Burdwan Division | Extension of different dia UPVC pipeline at the leftout portion of Kharoshgram village of Dirghapara PWSS within Kalna Sub-Division under Burdwan Division, PHE Dte. | ORD/000243/2021-2022 | 6106/BWD | 08/10/2021 | 30 | M/S UNIQUE | 6.67 | 0.00 | 1 | |||
| 374 | Burdwan Division | Continuation work order for Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Jaggeswardihi (Part) village of Jaggeswardihi piped water supply scheme within Katwa Sub-Division under Burdwan Division, PHE Dte. [Phase-I](Tr No.-250/BWD/2020-21) | ORD/000244/2020-2021 | 3413/BWD | 22/09/2020 | 30 | ABDUL HAI | 4.92 | 4.92 | 1 | |||
| 375 | Burdwan Division | Extension of different dia UPVC pipeline at different section of village Upalati, Hridaypur, Gopalpur, Sultanpur & Hatbele to cover up the uncovered habitation of Sultanpur PWSS within Kalna Sub-Division under Burdwan Division, PHE Dte. | ORD/000244/2021-2022 | 6122/BWD | 26/10/2021 | 30 | MAJILA ENTERPRISE | 14.34 | 0.00 | 1 | |||
| 376 | Burdwan Division | Continuation work order for Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Kashiara village of Kasiara piped water supply scheme within Katwa Sub-Division under Burdwan Division, PHE Dte. [Phase-I](Tr No.-260/BWD/2020-21) | ORD/000245/2020-2021 | 341/BWD | 22/09/2020 | 30 | HAMID SK | 4.92 | 4.92 | 1 | |||
| 377 | Burdwan Division | Continuation work order for Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Chanak village of Kashiara piped water supply scheme within Katwa Sub-Division under Burdwan Division, PHE Dte. [Phase-I](Tr No.-259/BWD/2020-21) | ORD/000246/2020-2021 | 3412/BWD | 22/09/2020 | 30 | BABUL SK | 4.92 | 4.92 | 1 | |||
| 378 | Burdwan Division | Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Sihigram village and Adibashipara, Hindupara (Sihigram), Kamarpara & Makarpara habitation of Majhergram piped water supply scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. [Phase-I](Tr No.-605/BWD/2020-21) | ORD/000249/2020-2021 | 4125/BWD | 16/10/2020 | 30 | N.S. ENTERPRISE | 4.86 | 1.35 | 1 | |||
| 379 | Burdwan Division | Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Arrah village and arrah habitation of AMARUN piped water supply scheme within Durgapur (bardhaman North) Sub-Division under Burdwan Division, PHE Dte. [Phase-I](Tr No.-542/BWD/2020-21) | ORD/000252/2020-2021 | 3346/BWD | 18/09/2020 | 30 | M.R. CONSTRUCTION CO. | 4.86 | 4.86 | 1 | |||
| 380 | Burdwan Division | Continuation work order for Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Shaktigarh (Part-B) village of Shaktigarh piped water supply scheme within Burdwan Sub-Division under Burdwan Division, PHE Dte. [Phase-I](Tr No.-649/BWD/2020-21) | ORD/000253/2020-2021 | 4271/BWD | 03/11/2020 | 30 | T.K. BANERJEE & CO. | 4.91 | 4.91 | 1 | |||
| 381 | Burdwan Division | Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of Tehata Piped Water Supply Scheme at Bajitpur (P), Jhiekra (P), Habibpur (P), Narenga Kutubpur (P) & Saipara (P) Village (Mouza), Kalna-II Block under Burdwan Division, PHE Dte. | ORD/000254/2021-2022 | 6640/BWD | 29/11/2021 | 30 | INVENT ENGINEERS CO. OPERATIVE SOCIETY LTD. | 26.96 | 0.00 | 1 | |||
| 382 | Burdwan Division | Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Dhamai village and Dhamai habitation of Nadanghat piped water supply scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. [Phase-I](Tr No.-558/BWD/2020-21) | ORD/000255/2020-2021 | 4120/BWD | 16/10/2020 | 30 | NANDY UDYOG | 4.85 | 4.85 | 1 | |||
| 383 | Burdwan Division | Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of Dharmadanga Piped Water Supply Scheme at Dharmadanga (P) Village (Mouza), Kalna-I Block under Burdwan Division, PHE Dte. | ORD/000255/2021-2022 | 6641/BWD | 29/11/2021 | 30 | INVENT ENGINEERS CO. OPERATIVE SOCIETY LTD. | 14.94 | 0.00 | 1 | |||
| 384 | Burdwan Division | Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Jhaudanga & Sarisha village and North Jhaudwnga (Part) & Sarisha habitation of Jhaudanga piped water supply scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. [Phase-I](Tr No.-554/BWD/2020-21) | ORD/000256/2020-2021 | 4114/BWD | 16/10/2020 | 30 | BARABELUN NO.-II G.P. UNEMPLOYED CO-OP LABOUR CONTRACT & CONSTRUCTION SOCIETY LTD. | 4.86 | 4.86 | 1 | |||
| 385 | Burdwan Division | Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Dhanya Kherur village and Deleypara, Malpara, Mandalpara, Paschimpara & Purba Daspara habitation of Majhergram piped water supply scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. [Phase-I](Tr No.-385/BWD/2020-21) | ORD/000257/2020-2021 | 4124/BWD | 16/10/2020 | 30 | SUBRATA GUPTA | 4.86 | 4.86 | 1 | |||
| 386 | Burdwan Division | Sinking of additional 250 X 200mm dia Tube Well 150 mtr. Depth by D.R. Rig method using UPVC pipe (CD) and UPVC Deep Well Screen (RDS) for BAGILA Piped Water Supply Scheme, Block - Memari - II, Dist - Purba Bardhaman under Burdwan Division, PHE Dte._ 2ND CALL | ORD/000257/2022-2023 | 3503/BWD | 10/08/2022 | 30 | MUNSHI ENTERPRISE | 10.18 | 0.00 | 1 | |||
| 387 | Burdwan Division | Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Dhamai village and Nimar habitation of Nadanghat piped water supply scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. [Phase-I](Tr No.-389/BWD/2020-21) | ORD/000258/2020-2021 | 4121/BWD | 16/10/2020 | 30 | RUPALI ENTERPRISE | 4.86 | 4.86 | 1 | |||
| 388 | Burdwan Division | Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of Jageswardihi Piped Water Supply Scheme at Kaichar & Sitalgram Village (Mouza), Mongolkot Block under Burdwan Division, PHE Dte. | ORD/000258/2021-2022 | 6694/BWD | 01/12/2021 | 60 | HAMID SK | 58.77 | 0.00 | 1 | |||
| 389 | Burdwan Division | Continuation work order for Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Jarogram village and Jarogram habitation of Madhabpur piped water supply scheme within Burdwan Sub-Division under Burdwan Division, PHE Dte. [Phase-I](Tr No.-662/BWD/2020-21) | ORD/000259/2020-2021 | 4911/BWD | 08/12/2020 | 30 | SUPRIYA RAY | 4.87 | 4.87 | 1 | |||
| 390 | Burdwan Division | Extension of Pipeline for Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of TAKIPUR Piped Water Supply Scheme at Takipur (Part), Asinda (part) & Chanwari (Part) habitation, Ausgram-I Block within Durgapur (Burdwan North) Sub Division under Burdwan Division, P.H.E. Dte. | ORD/000259/2021-2022 | 6693/BWD | 01/12/2021 | 30 | HAMID SK | 20.08 | 0.00 | 1 | |||
| 391 | Burdwan Division | Continuation work order for Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Gureghar village and Gureghar habitation of Madhabpur piped water supply scheme within Burdwan Sub-Division under Burdwan Division, PHE Dte. [Phase-I](Tr No.-557/BWD/2020-21) | ORD/000260/2020-2021 | 4910/BWD | 08/12/2020 | 30 | KAUSHIK RAY | 4.87 | 4.87 | 1 | |||
| 392 | Burdwan Division | Continuation work order for Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Ekaihat village of Ekaihat piped water supply scheme within Katwa Sub-Division under Burdwan Division, PHE Dte. [Phase-I](Tr No.-329/BWD/2020-21) | ORD/000261/2020-2021 | 3739/BWD | 07/10/2020 | 30 | JAI MAA DURGA & CO. | 1.74 | 1.74 | 1 | |||
| 393 | Burdwan Division | Connection from newly constructed Over Head Reservoir to Distribution System & Rising main Pipe Line of PRATAPPUR ( ZONE - I & II ) and its adjoining mouza's Piped W/S Scheme at Ausgram-II Block, within Durgapur (Burdwan North) Sub Division under Burdwan Division, P.H.E. Dte._2nd Call [Gr.-A] | ORD/000262/2021-2022 | 689/DSD | 08/12/2021 | 21 | S.S. ENTERPRISE | 1.66 | 0.00 | 1 | |||
| 394 | Burdwan Division | Continuation work order for Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Amar village of Natungram piped water supply scheme within Burdwan Sub-Division under Burdwan Division, PHE Dte. [Phase-I](Tr No.-579/BWD/2020-21) | ORD/000263/2020-2021 | 4465/BWD | 11/11/2020 | 30 | BAMDEB CONSTRUCTION & CO | 4.92 | 4.92 | 1 | |||
| 395 | Burdwan Division | Extension of UPVC pipe line of LDS at Manderbati village and Majhipara for providing FHTC of Gramdihi and its adjoining mouzas W/S Scheme within Bhatar Block under Burdwan Division, P.H.E. Dte. [Gr.-B] | ORD/000263/2021-2022 | 690/DSD | 08/12/2021 | 30 | BIPLAB SAMANTA | 2.26 | 0.00 | 1 | |||
| 396 | Burdwan Division | Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Ekaihat & Bikaihat (Pt-A) village of Ekaihat piped water supply scheme within Katwa Sub-Division under Burdwan Division, PHE Dte. [Phase-I](Tr No.-486/BWD/2020-21) | ORD/000265/2020-2021 | 236/KTS | 30/09/2020 | 4 | JAI MAA DURGA & CO. | 1.29 | 1.28 | 1 | |||
| 397 | Burdwan Division | Extension of UPVC pipe line of LDS at Bighra village for providing FHTC of Gramdihi and its adjoining mouzas W/S Scheme within Bhatar Block under Burdwan Division, P.H.E. Dte. [Gr.-D] | ORD/000265/2021-2022 | 692/DSD | 08/12/2021 | 30 | SHUBHRA KANTI GHOSH | 4.30 | 0.00 | 1 | |||
| 398 | Burdwan Division | Replacement of damage UPVC Pipeline at Mankar Masjit Tala under Mankar (Zone-II) Piped Water Supply Scheme under Galsi-I Block within Durgapur (Burdwan North) Sub Division under Burdwan Division, P.H.E. Dte. [Gr.-F] | ORD/000266/2021-2022 | 693/DSD | 08/12/2021 | 21 | SURATH DEY | 1.47 | 0.00 | 1 | |||
| 399 | Burdwan Division | Continuation work order for Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Putsuri village of Putsuri piped water supply scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. [Phase-I](Tr No.-546/BWD/2020-21) | ORD/000268/2020-2021 | 3532/BWD | 25/09/2020 | 30 | PRONAB KUMAR DEY | 4.92 | 4.92 | 1 | |||
| 400 | Burdwan Division | Sinking of 200 mm dia. River Bank Tube Well 60 mtr. Depth by D.R. Rig method using UPVC pipe (CM) and UPVC Deep Well Screen (RMS) at Gohogram village Block -Galsi-II, Dist - Purba Bardhaman under Durgapur Sub Division, PHE Dte. [Gr.-A] | ORD/000269/2022-2023 | 494/DSD | 12/08/2022 | 21 | KOUSIK MALLICK | 4.35 | 0.00 | 1 | |||
| 401 | Burdwan Division | Sinking of 200 mm dia River Bank Tube Well 60 mtr. Depth by D.R. Rig method using UPVC pipe (CM) and UPVC Deep Well Screen (RMS) at Simasimi village Block -Galsi-I, Dist - Purba Bardhaman under Durgapur Sub Division, PHE Dte. [Gr.-B] | ORD/000270/2022-2023 | 495/DSD | 12/08/2022 | 21 | MUNSHI JAVEDUR JAMAN | 4.35 | 0.00 | 1 | |||
| 402 | Burdwan Division | Sinking of 200 mm dia River Bank Tube Well 60 mtr. Depth by D.R. Rig method using UPVC pipe (CM) and UPVC Deep Well Screen (RMS) at Norja village Block -Bhatar, Dist - Purba Bardhaman under Durgapur Sub Division, PHE Dte. [Gr.-C] | ORD/000271/2022-2023 | 496/DSD | 12/08/2022 | 21 | DHIRENDRANATH SOM | 4.35 | 0.00 | 100 | |||
| 403 | Burdwan Division | Connection from newly Retrofitted Over Head Reservoir to Distribution System & Rising main Pipe Line of MANKAR (Zone-I) Water Supply Scheme under Galsi-I Block under within Durgapur Sub Division PHE Dte. Under Burdwan Division PHE Dte. [Gr.-D] | ORD/000272/2022-2023 | 497/DSD | 12/08/2022 | 30 | SHUBHRA KANTI GHOSH | 4.77 | 0.00 | 1 | |||
| 404 | Burdwan Division | Extension of UPVC pipe line of LDS at Kaitara, Patrahati and Mahara Mouza for providing FHTC of Adra and its adjoining mouzas W/S Scheme under Durgapur Sub-Division, Burdwan Division, P.H.E. Dte. [Gr.-E] | ORD/000273/2022-2023 | 498/DSD | 12/08/2022 | 30 | SHUBHRA KANTI GHOSH | 4.81 | 0.00 | 1 | |||
| 405 | Burdwan Division | Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of Takipur Piped Water Supply Scheme at Asinda, Chonari & Takipur Village (Mouza), Ausgram-I Block under Burdwan Division, PHE Dte. (Agreement No. 575/BWD of 2020-2021) | ORD/000274/2020-2021 | 440/BWD | 19/01/2021 | 45 | KOUSIK MALLICK | 36.91 | 33.10 | 1 | |||
| 406 | Burdwan Division | Providing Functional Household Tap Connection from existing distribution system at Sukhpukuria village under Gotistha Gram Panchayet under Mongalkote Block under Paschim Gopalpur PWSS under Katwa Sub-Division under Burdwan Division PHE Dte. (Sl No-2) | ORD/000274/2021-2022 | 799/KTS | 10/12/2021 | 15 | JAMALUDDIN SK | 3.69 | 0.00 | 1 | |||
| 407 | Burdwan Division | Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of ITLA Piped Water Supply Scheme at Itla (Itla Adibasipara Habitation) & Sudipur (Sudipur Habitation) Village (Mouza), Jamalpur Block under Burdwan Division, PHE Dte. (Agreement No. 583/BWD OF 2020-2021.) | ORD/000275/2020-2021 | 545/BWD | 22/01/2021 | 60 | ANWESHA CONSTRUCTION | 17.35 | 17.20 | 1 | |||
| 408 | Burdwan Division | Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of ITLA Piped Water Supply Scheme at Bahadurpur (Bahadurpur Habitation) Village (Mouza), Jamalpur Block under Burdwan Division, PHE Dte. | ORD/000276/2020-2021 | 617/BWD | 25/01/2021 | 60 | A R TRADERS | 19.81 | 8.09 | 1 | |||
| 409 | Burdwan Division | Restoration of pipeline at 6-Mile_Shibpur-Dharampur along & across Bardhaman-Katwa Road (SH-7) & providing FHTC at Aimapara (Part), Mahachanda (Part), Shibpur, Dharampur, Nunari (Part) Village (Mouza) under MAHACHANDA Piped W/S. Scheme under Burdwan Division, PHE. Dte. | ORD/000277/2021-2022 | 6934/BWD | 13/12/2021 | 45 | PREMANANDA ROY BISWAS | 43.33 | 0.00 | 1 | |||
| 410 | Burdwan Division | Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of Jaugram Piped Water Supply Scheme at Jaugram Village (P) (Mouza), Jamalpur Block under Burdwan Division, PHE Dte. | ORD/000278/2021-2022 | 6952/BWD | 14/12/2021 | 30 | SAIKAT RAY | 33.69 | 0.00 | 1 | |||
| 411 | Burdwan Division | Laying of pipe line parallel to the main line of the existing Distribution System including providing FHTC at Kalyanbati, Narayanpur, Bijoynagar, Purba Bijnagar & Ramkrishnapur village (Mouza) within scheme jurisdiction of SUDPUR Piped W/S. Scheme under Burdwan Division PHE Dte. | ORD/000279/2021-2022 | 6972/BWD | 15/12/2021 | 60 | MD HASIN | 63.40 | 0.00 | 1 | |||
| 412 | Burdwan Division | Laying Parallel Pipeline to improve drinking water supply, Construction of Boundary wall, Path Way, Drain at Head Work Site & 2nd TW Site and providing leftout FHTC, Road Restoration with allied work for MUGRA Piped Water Supply Scheme, Block- Raina-I, within Burdwan Sub Division under Burdwan Division PHE Dte. | ORD/000279/2024-2025 | 2711/BWD | 11/07/2024 | 2720 | M/S PURBASHA | 40.24 | 0.00 | 90 | |||
| 413 | Burdwan Division | Extension of pipeline for Sahhosenpur water supply scheme at Sahhosenpur village (Near Masjid) within Jamalpur Block under Burdwan Division, PHE Dte.[Gr.-B] | ORD/000281/2021-2022 | 1212/BSD | 09/09/2021 | 30 | ROY BISWAS CONSTRUCTION | 4.96 | 0.00 | 1 | |||
| 414 | Burdwan Division | Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of Srirampur Piped Water Supply Scheme at Srirampur Northpara, Srirampur Southpara & Srirampur Westpara within Srirampur (P) Village (Mouza), Purbasthali-I Block under Burdwan Division, PHE Dte. | ORD/000283/2021-2022 | 7002/BWD | 16/12/2021 | 60 | HAMID SK | 71.23 | 0.00 | 1 | |||
| 415 | Burdwan Division | Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Khetpur Palashi (Pt-B) village of Khetpur Palashi piped water supply scheme within Katwa Sub-Division under Burdwan Division, PHE Dte. [Phase-I](Tr No.-463/BWD/2020-21) | ORD/000284/2020-2021 | 242/KTS | 01/10/2020 | 4 | SANTANU BHATTACHARYAY | 1.21 | 1.20 | 1 | |||
| 416 | Burdwan Division | Restoration of village road and drains at part of RAYKONA & KAKRA for Debshala piped water supply scheme, Block-Ausgram-II under Burdwan Division, PHE Dte. [Gr.-M] | ORD/000284/2021-2022 | 668/DSD | 25/11/2021 | 15 | SAI TUBE CO. | 3.91 | 0.00 | 1 | |||
| 417 | Burdwan Division | Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Belari village of Kayrapur Piped W/S Scheme (Part-A) within Durgapur (Bardhaman North) Sub-Division under Burdwan Division, P.H.E. Dte.[Gr.-A] | ORD/000286/2021-2022 | 715/DSD | 17/12/2021 | 15 | M/S S. CHOUDHURY | 4.83 | 0.00 | 1 | |||
| 418 | Burdwan Division | Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Kayrapur vilage of Kayrapur Piped W/S Scheme (Part-A) within Durgapur (Bardhaman North) Sub-Division under Burdwan Division, P.H.E. Dte. [Gr.-B] | ORD/000287/2021-2022 | 716/DSD | 17/12/2021 | 15 | M/S S. CHOUDHURY | 4.83 | 0.00 | 1 | |||
| 419 | Burdwan Division | Extension of UPVC and HDPE Pipe Line, Providing Left Out FHTC at south part of Debipur rail gate, Land Development & construction of PCC approach Road inside proposed boundary of H/W Site of ALIPUR & its adjacent mouza Water Supply Scheme under MEMARI-I Block of Burdwan Division, PHE Dte. | ORD/000287/2024-2025 | 2740/BWD | 12/07/2024 | 171 | M/S K.P. CONSTRUCTION | 122.03 | 0.00 | 50 | |||
| 420 | Burdwan Division | Extension of distribution main for providing FHTC at Shalkuni village within Orgram W/S Scheme (Zone-II) in Bhatar Block under Burdwan Division, P.H.E. Dte. [Gr.-C] | ORD/000288/2021-2022 | 717/DSD | 17/12/2021 | 30 | DHIRENDRANATH SOM | 3.62 | 0.00 | 1 | |||
| 421 | Burdwan Division | Extension of distribution main for providing FHTC at Shilakot village within Orgram W/S Scheme (Zone-II) in Bhatar Block under Burdwan Division, P.H.E. Dte.[Gr.-D] | ORD/000289/2021-2022 | 718/DSD | 17/12/2021 | 30 | DHIRENDRANATH SOM | 3.15 | 0.00 | 1 | |||
| 422 | Burdwan Division | Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of ERUAR Piped Water Supply Scheme at Eruar (Part-A) (Eruar (Part-A) Habitation) village (Mouza), Bhatar Block under Burdwan Division, PHE Dte. (Agreement no. 569/BWD of 2020-2021) | ORD/000290/2020-2021 | 356/BWD | 15/01/2021 | 30 | HAFIJUR RAHAMAN MIDYA | 19.95 | 19.50 | 1 | |||
| 423 | Burdwan Division | Extension of distribution main for providing FHTC at Shikarpur village within Orgram W/S Scheme (Zone-II) in Bhatar Block under Burdwan Division, P.H.E. Dte. [Gr.-E] | ORD/000290/2021-2022 | 719/DSD | 17/12/2021 | 30 | DHIRENDRANATH SOM | 3.28 | 0.00 | 1 | |||
| 424 | Burdwan Division | Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of Anguna Piped Water Supply Scheme at Anguna (Part), Gunar (Part) & Sakita Village (Mouza), Raina-I Block under Burdwan Division, PHE Dte. | ORD/000291/2020-2021 | 517/BWD | 21/01/2021 | 45 | SK ALIM | 33.40 | 19.46 | 1 | |||
| 425 | Burdwan Division | Extension of UPVC pipe line of LDS at Vivekanandapally for providing FHTC of Bhatar and its adjoining mouzas W/S Scheme (Zone-I) under Durgapur Sub-Division, Burdwan Division, P.H.E. Dte. [Gr.-F] | ORD/000291/2021-2022 | 720/DSD | 17/12/2021 | 30 | DHIRENDRANATH SOM | 2.24 | 0.00 | 1 | |||
| 426 | Burdwan Division | Different type of works releted at head work side (Internal pathways , Land-Development, repair of pump house and drain) under Nabastha PWSS under Burdwan-II Block under Burdwan Division, PHE Dte. | ORD/000291/2024-2025 | 1272/BSD | 12/07/2024 | 173 | M/S PALASH BISWAS | 4.77 | 0.00 | 100 | |||
| 427 | Burdwan Division | Extension of UPVC pipe line of LDS at Bhatar Alinagar for providing FHTC of Bhatar and its adjoining mouzas W/S Scheme (Zone-I) under Durgapur Sub-Division, Burdwan Division, P.H.E. Dte.[Gr.-G] | ORD/000292/2021-2022 | 721/DSD | 17/12/2021 | 30 | DHIRENDRANATH SOM | 4.69 | 0.00 | 1 | |||
| 428 | Burdwan Division | Allied work for inter connection between 3rd tube well site and laying distribution system for Suhari PWSS within Bardhaman-II Block , under Burdwan Division, PHE Dte | ORD/000292/2024-2025 | 1274/BSD | 12/07/2024 | 7 | ISHAN CONSTRUCTION | 2.34 | 0.00 | 100 | |||
| 429 | Burdwan Division | Extension of uPVC pipe line of LDS at Kalpukur Dakshin Para to Palar Lal para for providing FHTC of Bhatar and its adjoining mouzas W/S Scheme (Zone-II) under Durgapur Sub-Division, Burdwan Division, P.H.E. Dte. [Gr.-H] | ORD/000293/2021-2022 | 722/DSD | 17/12/2021 | 30 | DHIRENDRANATH SOM | 1.99 | 0.00 | 1 | |||
| 430 | Burdwan Division | Providing left out FHTC for 100% covarage in different village within Hatgobindapur PWSS , Bardhhaman-II Development Block under Burdwan Division, PHE Dte | ORD/000293/2024-2025 | 1275/BSD | 12/07/2024 | 45 | PAL CONSTRUCTION | 4.78 | 0.00 | 0 | |||
| 431 | Burdwan Division | Providing FHTC (650 Nos.) from dist. System within the command area of SUHARI piped water supply scheme at Masjidpara, Allahadipara, Varpally, Saktigarh Utttar Bazar Habitation (Putunda & Saktigarh Mouza) at Bardhhaman-II Development Block under Burdwan Division, PHE Dte. | ORD/000294/2021-2022 | 7027/BWD | 17/12/2021 | 30 | YOUNG ENGINEERS CO.-OPERATIVE SOCIETY LTD. | 19.58 | 0.00 | 1 | |||
| 432 | Burdwan Division | Continuation work order for Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Haripur village of Natu piped water supply scheme within Headquarters under Burdwan Division, PHE Dte. [Phase-I](Tr No.-278/BWD/2020-21) | ORD/000295/2020-2021 | 3365/BWD | 21/09/2020 | 30 | MITRA CONSTRUCTION | 4.92 | 4.92 | 1 | |||
| 433 | Burdwan Division | Extension of UPVC pipe line of LDS at Bhatar Maldanga road to Kalpukur Purbapar for providing FHTC of Bhatar and its adjoining mouzas W/S Scheme (Zone-II) under Durgapur Sub-Division, Burdwan Division, P.H.E. Dte. [Gr.-I] | ORD/000295/2021-2022 | 723/DSD | 17/12/2021 | 30 | DHIRENDRANATH SOM | 4.26 | 0.00 | 1 | |||
| 434 | Burdwan Division | Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of ERUAR Piped Water Supply Scheme at Eruar (Part-D) (Eruar (Part-D) Habitation) village (Mouza), Bhatar Block under Burdwan Division, PHE Dte. ._2ND CALL (Agreement No.703/BWD of 2020-2021) | ORD/000296/2020-2021 | 1569/15/BWD | 22/02/2021 | 30 | DUBE ENTERPRISE | 18.61 | 9.05 | 1 | |||
| 435 | Burdwan Division | Providing Functional Household Tap Connection (FHTC) & Restoration of pipeline at Sixteen Nos. samsad of Eruar Gram Panchayat from ERUAR Piped Water Supply Scheme at Bhatar Block under Burdwan Division, PHE Dte. | ORD/000296/2021-2022 | 7033/BWD | 17/12/2021 | 60 | IJABUL SEKH | 92.08 | 0.00 | 1 | |||
| 436 | Burdwan Division | Providing 35 Nos.FHTC at KASHIMPUR village for declearation of SWAJALGRAM under ISHUFABAD Piped Water Supply Scheme, Block- Burdwan-I within Burdwan Sub Division under Burdwan Division PHE Dte. | ORD/000296/2024-2025 | 1278/BSD | 12/07/2024 | 45 | DUBE ENTERPRISE | 1.64 | 0.00 | 0 | |||
| 437 | Burdwan Division | Continuation work order for Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Natu village of Natu piped water supply scheme within Headquarters under Burdwan Division, PHE Dte. [Phase-I](Tr No.-276/BWD/2020-21) | ORD/000297/2020-2021 | 3363/BWD | 21/09/2020 | 30 | SINGHA ROY AND CO. | 4.46 | 4.46 | 1 | |||
| 438 | Burdwan Division | Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of SIALI Piped Water Supply Scheme at Amarpur (Amarpur Habitation) Village (Mouza), Jamalpur Block under Burdwan Division, PHE Dte. (Agreement No. 572/BWD of 2020-2021) | ORD/000298/2020-2021 | 439/BWD | 19/01/2021 | 60 | M/S ANAND CONSTRUCTION | 16.46 | 15.91 | 1 | |||
| 439 | Burdwan Division | Extension of pipe line for FHTC work from the existing Distribution System within scheme jurisdiction at Panuhat village under Panuhat PWSS under Katwa Sub-Division under Burdwan Division PHE Dte. [Phase-1] (Sl No-1) | ORD/000298/2021-2022 | 728/KTS | 16/11/2021 | 7 | HAMID SK | 1.96 | 0.00 | 1 | |||
| 440 | Burdwan Division | Providing 45 Nos.FHTC at SIJEPARA village for declearation of SWAJALGRAM under NATUNGRAM Piped Water Supply Scheme , Block- Burdwan-I within Burdwan Sub Division under Burdwan Division PHE Dte | ORD/000298/2024-2025 | 1280/BSD | 12/07/2024 | 45 | SHANKHA GHOSH | 1.76 | 0.00 | 0 | |||
| 441 | Burdwan Division | Extension of pipe line for FHTC work from the existing Distribution System within scheme jurisdiction at Panuhat village under Panuhat PWSS under Katwa Sub-Division under Burdwan Division PHE Dte. [Phase-2] (Sl No-2) | ORD/000299/2021-2022 | 729/KTS | 16/11/2021 | 7 | HAMID SK | 1.93 | 0.00 | 1 | |||
| 442 | Burdwan Division | Providing 50 Nos.FHTC at BIRPUR village for declearation of SWAJALGRAM under NATUNGRAM Piped Water Supply Scheme , Block- Burdwan-I within Burdwan Sub Division under Burdwan Division PHE Dte. | ORD/000299/2024-2025 | 1281/BSD | 12/07/2024 | 45 | I.S. ENTERPRISE | 2.28 | 0.00 | 100 | |||
| 443 | Burdwan Division | Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of Shushuni Piped Water Supply Scheme at Shushuni (Part) (Ghoshpara & Sethpur habitation) Village (Mouza), Monteswar Block under Burdwan Division, PHE Dte. [Agreement No.661/BWD OF 2020-2021] | ORD/000300/2020-2021 | 1152/BWD | 09/02/2021 | 30 | SUSUNIA GP CO. OPERATIVE LABOUR CONTRACT AND CONSTRUCTION SOCIETY LTD. | 19.79 | 4.80 | 1 | |||
| 444 | Burdwan Division | Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of Mahindar Piped Water Supply Scheme at Mahindar Village (2 Nos habitations), Faimpur Village, Shitalpur Village, Sahapur Village (2 Nos. habitations & Parbatpur Village (2 Nos. habitations), Jamalpur Block under Burdwan Division, PHE Dte. [Agreement No. 684/BWD OF 2020-2021.] | ORD/000301/2020-2021 | 1456/BWD | 18/02/2021 | 60 | S.S. CONSTRUCTION | 73.07 | 0.00 | 1 | |||
| 445 | Burdwan Division | Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of PUTSURI Piped Water Supply Scheme at Kasa (6 Nos. Habs.), Purba Balarampur, Bhurkunda (7 Nos. Habs.), Patun (5 Nos. Habs.) & Bigha (3 Nos. Habs.) Village (Mouza), Monteswar Block under Burdwan Division, PHE Dte. | ORD/000302/2021-2022 | 7020/BWD | 17/12/2021 | 60 | INVENT ENGINEERS CO. OPERATIVE SOCIETY LTD. | 53.94 | 0.00 | 1 | |||
| 446 | Burdwan Division | Continuation work order for Water tap connection in each house hold from existing dist. System within Scheme jurisdiction in Katshimul village (Part) of Kamarhati (Zone-II) piped water supply scheme within Burdwan Sub-Division PHE Dte Part-A.Gr. D. | ORD/000307/2021-2022 | 1686/BSD | 17/12/2021 | 30 | MUNSHI JAVEDUR JAMAN | 4.83 | 0.00 | 1 | |||
| 447 | Burdwan Division | Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of ITLA Piped Water Supply Scheme at Itla (Itla Habitation) Village (Mouza), Jamalpur Block under Burdwan Division, PHE Dte. [Agreement No. 593/BWD OF 2020-2021] | ORD/000308/2020-2021 | 618/BWD | 25/01/2021 | 60 | JAYANTA CHAKRABORTY | 18.36 | 5.96 | 1 | |||
| 448 | Burdwan Division | Continuation work order for Water tap connection in each house hold from existing dist. System within Scheme jurisdiction in Katshimul village (Part) of Kamarhati (Zone-II) piped water supply scheme within Burdwan Sub-Division PHE Dte Part-B..Gr. E. | ORD/000308/2021-2022 | 1685/BSD | 17/12/2021 | 30 | DUBE ENTERPRISE | 4.83 | 0.00 | 1 | |||
| 449 | Burdwan Division | Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of Nabagram Piped Water Supply Scheme at Konar Village (2 Nos. habitations), Dadpur Village (4 Nos. habitations), Paschim Memari Village (2 Nos. habitations), Pingur Village & Nabagram Village (4 Nos. habitations), Memari - I Block under Burdwan Division, PHE Dte.[Agreement No. 681/BWD OF 2020-2021] | ORD/000311/2020-2021 | 1400/BWD | 15/02/2021 | 60 | UNIQUE AGENCY | 68.10 | 63.58 | 1 | |||
| 450 | Burdwan Division | Extension of pipeline for providing functional house hold tap connection at Jougram village of Jougram piped water supply scheme within Burdwan Sub-Division under Burdwan Division, PHE Dte..Gr.A. | ORD/000311/2021-2022 | 1033/BSD | 05/08/2021 | 30 | N.S. ENTERPRISE | 0.69 | 0.00 | 1 | |||
| 451 | Burdwan Division | Trial boring at Kumarun for Serua and its Adjoining Mouza Water Supply Scheme within Bhatar Block under Burdwan Division PHE Dte. [Gr.-C] | ORD/000314/2022-2023 | 526/DSD | 22/08/2022 | 7 | BABA ADHIRA CONSTRUCTION | 0.60 | 0.00 | 1 | |||
| 452 | Burdwan Division | Trial boring at Serua for Serua and its Adjoining Mouza Water Supply Scheme within Bhatar Block under Burdwan Division PHE Dte. [Gr.-D] | ORD/000315/2022-2023 | 527/DSD | 22/08/2022 | 7 | BABA ADHIRA CONSTRUCTION | 0.60 | 0.00 | 1 | |||
| 453 | Burdwan Division | Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of Augmentation of Purbasthali Piped Water Supply Scheme at Kasthashali Village (Kasthashali habitation) (Mouza) & Purbasthali village (Purbasthali habitation), Purbasthali-II Block under Burdwan Division, PHE Dte. | ORD/000316/2020-2021 | 1328/BWD | 12/02/2021 | 60 | INDIAN ENGINEERS CO.-OPERATIVE SOCIETY LTD. | 91.41 | 26.24 | 1 | |||
| 454 | Burdwan Division | Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of AMARUN (Z-I & II) Piped Water Supply Scheme at Arra, Amarun, Nawada, Sunur (Part), Eora, Palsona & Bijyapur Village (Mouza), Bhatar Block under Burdwan Division, PHE Dte. | ORD/000317/2021-2022 | 7086/BWD | 22/12/2021 | 60 | NATIONAL CONSTRUCTION | 85.05 | 0.00 | 1 | |||
| 455 | Burdwan Division | Extension of pipeline for Sahhosenpur water supply scheme at Jotsrirram village within Jamalpur Block under Burdwan Division, PHE Dte.[Gr.-C] | ORD/000320/2021-2022 | 1333/BSD | 30/09/2021 | 30 | PREMANANDA ROY BISWAS | 4.52 | 0.00 | 1 | |||
| 456 | Burdwan Division | Water tap connection in each household from existing distribution system within scheme jurisdiction in Koldanga-Mirpur village (35 Nos) & Rameswarpur village (50 Nos) (Total-85 Nos) of Dharmadanga water supply scheme within Kalna Sub-Division under Burdwan Division, PHE Dte.[SL NO.-C] | ORD/000321/2021-2022 | 1026/KSD | 01/10/2021 | 15 | SETH ENTERPRISE | 2.95 | 0.00 | 1 | |||
| 457 | Burdwan Division | Relaying of different dia UPVC Pipeline at the different damage portion towards Mojaharnagar, Gulita, Denur & Putsuri of Putsuri PWSS within Kalna Sub-Division under Burdwan Division, PHE Dte. (Sl No-B) | ORD/000322/2021-2022 | 985/KSD Dt- 24.09.2021 | 24/09/2021 | 30 | M/S S. CHOUDHURY | 3.66 | 0.00 | 100 | |||
| 458 | Burdwan Division | Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of Agradwip Piped Water Supply Scheme at Agradwip (P) village & Kharpur (P) village, Katwa - II Block under Burdwan Division, PHE Dte._Part-A. [Agreement No. 704/BWD OF 2020-2021] | ORD/000323/2020-2021 | 1567/BWD | 22/02/2021 | 45 | KHEPIMA ENGINEERS CO. OPERATIVE SOCIETY LTD. | 44.39 | 43.48 | 0 | |||
| 459 | Burdwan Division | Construction of Pump House cum chlorine room (3.6 mtr x 3.0 mtr room) without sanitary and water supply arrangement at old Head Work Site of Purbasthali & it's adj. mouzas water supply scheme within Kalna Sub-Division under Burdwan Division, PHE Dte.^ (Sl No-C) | ORD/000323/2021-2022 | 986/KSD Dt- 24.09.2021 | 24/09/2021 | 60 | SURATH DEY | 2.84 | 0.00 | 1 | |||
| 460 | Burdwan Division | Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of Maheshdanga Piped Water Supply Scheme at Maheshdanga Village (5 Nos. habitations) & Kathalgachhi Village (3 Nos. habitations), Memari ¿ I Block under Burdwan Division, PHE Dte.(Agreement No. 722/BWD of 2020-2021) | ORD/000324/2020-2021 | 1687/BWD | 24/02/2021 | 60 | PABITRA KUMAR SAMANTA | 54.78 | 52.52 | 1 | |||
| 461 | Burdwan Division | Construction of sluice valve chamber and extension of pipeline for making functional of Household Tap at Daspur village within Antpara piped water supply scheme under Burdwan Division, PHE Dte.[Gr.-A] | ORD/000325/2021-2022 | 1728/AE/HQ | 25/08/2021 | 30 | J. K. CORPORATION | 1.64 | 0.00 | 1 | |||
| 462 | Burdwan Division | Hire and labour charges for staging and scaffolding bamboo barricading and removal of rubbish for dismantling capacity 136 Cum of RCC Over Head Reservoir at Purbasthali & it's adj. mouzas water Supply Scheme within Kalna Sub Divison under Burdwan Division , PHE Dte. (Sl No-A) | ORD/000327/2021-2022 | 967/KSD Dt-20.09.2021 | 20/09/2021 | 30 | INVENT ENGINEERS CO. OPERATIVE SOCIETY LTD. | 4.47 | 0.00 | 1 | |||
| 463 | Burdwan Division | Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of GHOSH Piped Water Supply Scheme at Andur & Bahapur village (Mouza), Memari ¿ I Block under Burdwan Division, PHE Dte.(Agreement No. 577/BWD of 2020-2021) | ORD/000328/2020-2021 | 437/BWD | 24/02/2021 | 30 | MAJILA ENTERPRISE | 22.76 | 22.70 | 1 | |||
| 464 | Burdwan Division | Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of KANSHRA Piped Water Supply Scheme at Bishnubati (Harekrishnapur Habitation), Jotsubal (Jotsubalpaharpur & Sagar Habitation) Village (Mouza), Jamalpur Block under Burdwan Division, PHE Dte. (Agreement no. 594/BWD of 2020-2021) | ORD/000330/2020-2021 | 619/BWD | 25/01/2021 | 60 | ROY CONSTRUCTION | 20.42 | 20.23 | 1 | |||
| 465 | Burdwan Division | Sinking of 200mm dia River bank Tube Well 60 mtr. Depth by D.R. Rig method using UPVC pipe (CM) and UPVC Deep Well Screen (RMS) at Taranagar village under Joykrishnapur water supply scheme,Block -Galsi-II, Dist - Purba Bardhaman under Durgapur Sub Division, PHE Dte. [Gr.-A] | ORD/000330/2022-2023 | 533/DSD | 22/08/2022 | 21 | ANIRUDDHA FARUQUE | 4.35 | 0.00 | 1 | |||
| 466 | Burdwan Division | Sinking of 200mm dia River bank Tube Well 60 mtr. Depth by D.R. Rig method using UPVC pipe (CM) and UPVC Deep Well Screen (RMS) at Simuliya village under Joykrishnapur water supply scheme,Block -Galsi-II, Dist - Purba Bardhaman under Durgapur Sub Division, PHE Dte. [Gr.-B] | ORD/000331/2022-2023 | 534/DSD | 22/08/2022 | 21 | SANDIPAN SENGUPTA | 4.35 | 0.00 | 1 | |||
| 467 | Burdwan Division | Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of KANSHRA Piped Water Supply Scheme at Jotkrishtai (Jotkestai Habitation), Kalna (Jotkalna Habitation) & Kanshra (Bhabanipur Habitation) Village (Mouza), Jamalpur Block under Burdwan Division, PHE Dte.(Agreement no. 571/BWD of 2020-2021) | ORD/000332/2020-2021 | 441/BWD | 19/01/2021 | 60 | GENUINE ENGINEERING CO-OP. SOCIETY LTD. | 19.48 | 19.44 | 1 | |||
| 468 | Burdwan Division | Extension of 50 mm dia. pipeline at "Serua-Basuda-Jhujkadanga" villages of Serua and its adjoining mouza's Piped W/S Scheme at Bhatar Block within Durgapur Sub Division under Burdwan Division, P.H.E. Dte.[Gr.-C] | ORD/000332/2021-2022 | 02/DSD | 03/01/2022 | 30 | DHIRENDRANATH SOM | 1.84 | 0.00 | 1 | |||
| 469 | Burdwan Division | Relaying and repairing of distribution after widening of PWD road in between Chainage 8.40 km to 10.74 km of Galsi Gohogram road between Node 74 to Node 117 within Adra W/S Scheme at Durgapur Sub-Division in Galsi-II Block under Burdwan Division, P.H.E. Dte.[Gr.-D] | ORD/000333/2021-2022 | 03/DSD | 03/01/2022 | 30 | SHUBHRA KANTI GHOSH | 4.82 | 0.00 | 1 | |||
| 470 | Burdwan Division | Extension of pipeline for GHOSH Piped Water Supply Scheme at Mondaljone (6 Nos), Kashirampur (8 Nos),Total 14 Nos FHTC Work for Sajal Gram(As per Field verification report for Har Ghar Jal Certification within Memari-I Block including leftout household water connection (FHTC) under Burdwan Division,PHE Dte. Gr.A. | ORD/000333/2022-2023 | 1350/BSD | 02/08/2022 | 5 | MAJILA ENTERPRISE | 0.97 | 0.00 | 1 | |||
| 471 | Burdwan Division | Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of Nadanghat Piped Water Supply Scheme at Kundapara village & Nadanghat village, Purbasthali - I Block under Burdwan Division, PHE Dte. (Agreement No. 700/BWD of 2020-2021) | ORD/000334/2020-2021 | 1543/BWD | 22/02/2021 | 60 | MAA LAXMI ENTERPRISE | 51.66 | 0.00 | 1 | |||
| 472 | Burdwan Division | Extension of pipeline at "Panua, Ratanpur & Rajipur" villages of Serua and its adjoining mouza's Piped W/S Scheme at Bhatar Block within Durgapur Sub Division under Burdwan Division, P.H.E. Dte. [Gr.-E] | ORD/000334/2021-2022 | 04/DSD | 03/01/2022 | 30 | DHIRENDRANATH SOM | 4.68 | 0.00 | 1 | |||
| 473 | Burdwan Division | Extension of pipeline for NABAGRAM Piped Water Supply Scheme at Konarpara [24 No's]Total 24 No's FHTC Work for Sajal Gram (As per Resulation taken in Special Gram Sava on 01-08-2022 within Memari-I Block including leftout husehold water tap connection (FHTC) under Burdwan Division, PHE Dte".Gr. B | ORD/000334/2022-2023 | 1351/BSD | 02/08/2022 | 5 | BHARAT CONSTRUCTION | 0.97 | 0.00 | 1 | |||
| 474 | Burdwan Division | Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of Balgona Piped Water Supply Scheme at Balgona village (Balgona (P), Patna habs), Bhatar Block under Burdwan Division, PHE Dte. | ORD/000335/2020-2021 | 1574/BWD | 22/02/2021 | 60 | M/S S. CHOUDHURY | 63.94 | 0.00 | 1 | |||
| 475 | Burdwan Division | Extension of pipeline at "Bamunara & Kumarun & Sakraw" villages of Serua and its adjoining mouza's Piped W/S Scheme at Bhatar Block within Durgapur Sub Division under Burdwan Division, P.H.E. Dte. [Gr.-F] | ORD/000335/2021-2022 | 05/DSD | 03/01/2022 | 30 | DHIRENDRANATH SOM | 2.98 | 0.00 | 0 | |||
| 476 | Burdwan Division | Extension of pipeline for NABAGRAM Piped water Supply Scheme at Kalupukur[2 Nos]Kalanabagram[5 Nos]Dadpur[8 Nos],Paschim Memari[6 Nos]Pingur[3 Nos]Chuadanga:3 Nos Total 27 Nos FHTC Work for Sajal Gram(As per Resulation taken in Special Gram Sava on 01-08-2022 within Memari-I Block including leftout household water tap connection(FHTC)under Burdwan Division,PHE Dte.Gr.C. | ORD/000335/2022-2023 | 1352/BSD | 02/08/2022 | 5 | BHARAT CONSTRUCTION | 0.97 | 0.00 | 1 | |||
| 477 | Burdwan Division | Restoration of damaged pipeline of distribution main at Laxmiganj village and laying of parallel line at Gonna village for providing FHTC within Dwariapur W/S Scheme in Ausgram-II Block under Burdwan Division, P.H.E. Dte. [Gr.-G] | ORD/000336/2021-2022 | 06/DSD | 03/01/2022 | 30 | RANADHIR SINHA | 2.11 | 0.00 | 1 | |||
| 478 | Burdwan Division | Extension of pipeline for UTTAR RADHAKANTAPUR Piped water Supply Scheme at Harirambati[7 Nos],Kamalpur[4 Nos],Kole[5 Nos],Mallikapur[2 Nos],Sahanagar[5 Nos]Total 23 Nos FHTC Work for Sajal Gram(As per Resulation taken in Special Gram Sava on 01-08-2022 within Memari-I Block including leftout household water tap connection(FHTC)under Burdwan Division,PHE Dte.Gr.D. | ORD/000336/2022-2023 | 1359/BSD | 03/08/2022 | 5 | D.M. ENTERPRISE | 0.96 | 0.00 | 1 | |||
| 479 | Burdwan Division | Digital structurization of pipeline alignment and asset evaluation including holistic design, preparation of design drawings of overall LDS & preparation of estimate for 03 Nos. Piped W/S. Schemes under Kalna II Block under Kalna Sub-Division under Burdwan Division, PHE. Dte. | ORD/000336/2024-2025 | 3016/BWD | 05/08/2024 | 20 | HORIZEN | 7.55 | 0.00 | 100 | |||
| 480 | Burdwan Division | Extension of pipeline for UTTAR RADHAKANTAPUR Piped Water Supply Scheme at Radhakantapur High School Kantagorer Par [23 Nos],Total 23 Nos FHTC Work for Sajal Gram (As per Field Verification Report for Har Ghar Jal Certification) within Memari-I Block including leftout household water tap connection(FHTC)under Burdwan Division,PHE Dte. Gr.U | ORD/000337/2022-2023 | 1365/BSD | 04/08/2022 | 5 | D.M. ENTERPRISE | 0.97 | 0.00 | 1 | |||
| 481 | Burdwan Division | Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of Shura (Zone-II) Piped Water Supply Scheme at Haragobindapur Village, Kubajpur Village, Dhapdhara Village, Sonargoria Village, Sahahosenpur Village & Paikpara Village Jamalpur Block under Burdwan Division, PHE Dte. (Agreement No. 687/BWD of 2020-2021) | ORD/000338/2020-2021 | 1324/BWD | 12/02/2021 | 60 | M/S PIONEER CONSTRUCTION | 73.63 | 0.00 | 1 | |||
| 482 | Burdwan Division | Providing FHTC from dist. System within the command area of GHOSH Piped Water Supply Scheme at Kashirampur, Joyampur, Sajina, Ichapur, Purba-Gantar, Andur, Bahabpur & Ghosh (Part) village (Mouza) at Memari-I Development Block under Burdwan Division, PHE Dte. | ORD/000338/2021-2022 | 25/BWD | 04/01/2022 | 30 | MAJILA ENTERPRISE | 36.17 | 0.00 | 1 | |||
| 483 | Burdwan Division | Extension of pipeline for UTTAR RADHAKANTAPUR Piped Water Supply Scheme at Radhakantapur Purbo Sansad Dule Para(23 Nos)Total 23 Nos FHTC Work for Sajal Gram(As per Field Verification Report for Har Ghar Jal Certification and praved for Prodhan of Gop Ganter-II G.P. within Memari-I Block including leftout household water tap connection(FHTC)under Burdwan Division,PHE Dte. Gr.V | ORD/000338/2022-2023 | 1366/BSD | 04/08/2022 | 5 | D.M. ENTERPRISE | 0.97 | 0.00 | 1 | |||
| 484 | Burdwan Division | Providing FHTC in Nandra & Naopara village for 100% coverage in Sajal Gram from existing distribution system within NANDRA PWSS, Bardhhaman-II Development Block under Burdwan Division, PHE Dte. Gr.F. | ORD/000339/2022-2023 | 1360/BSD | 03/08/2022 | 5 | BHARAT CONSTRUCTION | 0.97 | 0.00 | 1 | |||
| 485 | Burdwan Division | Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of RAYAN Piped Water Supply Scheme at Narayandighi & Sadhanpur (Part) Village (Mouza), Burdwan - I Block under Burdwan Division, PHE Dte. | ORD/000340/2021-2022 | 27/BWD | 04/01/2022 | 30 | DUBE ENTERPRISE | 30.24 | 0.00 | 1 | |||
| 486 | Burdwan Division | Providing Functional Household Tap Connection (FHTC) from distribution system within the command area of KAYRAPUR Water Supply Scheme (Part-A) at Belari, Bara, Bhada & Kayrapur (Part) village under JAL SAPNO MISSION under Ausgram-I Block in Purba Bardhanan District under Burdwan Division, P.H.E. Dte. | ORD/000341/2021-2022 | 26/BWD | 04/01/2022 | 30 | NANGTASWAR CO. OP. LABOUR CONT. AND CONSTRUCTION SOCIETY LTD. | 42.23 | 0.00 | 1 | |||
| 487 | Burdwan Division | Extension of pipeline providing FHTC for CHAKSHANJADI Piped Water Supply Scheme at Chalbalpur Habitation for Sajal Gram(As per Field Verification Report duly signed by Pradhan for Har Ghar Jal Certification)within Jamalpur Block under Burdwan Divn.PHE Dte.Gr.H. | ORD/000341/2022-2023 | 1364/BSD | 04/08/2022 | 5 | M/S ANAND CONSTRUCTION | 0.96 | 0.00 | 1 | |||
| 488 | Burdwan Division | Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of Masagram Piped Water Supply Scheme at Habaspur Village, Chouberia Village, Ballabhbati Village & Masagram (4 Nos. habitations), Jamalpur Block under Burdwan Division, PHE Dte. (Agr. No. 710/BWD of 2020-2021) | ORD/000342/2020-2021 | 1578/BWD | 22/02/2021 | 60 | MD HASIN | 60.21 | 14.70 | 1 | |||
| 489 | Burdwan Division | Providing leftout water tap connection in different villages for 100% coverage to make it Sajal Gram from existing distribution system within scheme jurisdiction of different Piped Water Supply Schemes within Burdwan ¿ I Block under Burdwan Division, PHE. Dte. | ORD/000342/2021-2022 | 32/BWD | 04/01/2022 | 30 | ROY BISWAS CONSTRUCTION | 9.89 | 0.00 | 1 | |||
| 490 | Burdwan Division | FHTC for Kamarhati (Zone-II) Water Supply Scheme at Kamarhati Village (36 Nos) of Raina II Block under Burdwan Division, PHE Dte [For 100% FHTC at Kamarhati Village (Harghar Jal). Gr.J | ORD/000342/2022-2023 | 1367/BSD | 04/08/2022 | 5 | ANWESHA CONSTRUCTION | 0.98 | 0.00 | 1 | |||
| 491 | Burdwan Division | Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of Serua Piped Water Supply Scheme at Bamunara village (Bamunara habs), Jhujkadanga village, Kumarun village & Panua (P) village (Panua (P) & Sakra habs), Bhatar Block under Burdwan Division, PHE Dte.[ | ORD/000344/2020-2021 | 1579/BWD | 22/02/2021 | 60 | SUPER CO. OPERATIVE LABOUR CONTRACT AND CONSTRUCTION SOCIETY LTD. | 54.03 | 22.16 | 1 | |||
| 492 | Burdwan Division | Providing leftout water tap connection in different villages for 100% coverage to make it Sajal Gram from existing distribution system within scheme jurisdiction of different Piped Water Supply Schemes within Raina ¿ I Block under Burdwan Division, PHE. Dte. | ORD/000344/2021-2022 | 39/BWD | 05/01/2022 | 30 | HAFIJUR RAHAMAN MIDYA | 15.62 | 0.00 | 1 | |||
| 493 | Burdwan Division | Providing FHTC for 100% coverage at Muidipur, Ujirpur, Reshalatpur, Kora, Siali & Amarpur Habitation (Village) for SIALI piped W/S Scheme, Jamalpur Dev. Block under Burdwan Division, PHE Dte. | ORD/000344/2023-2024 | 3033/BWD | 14/07/2023 | 264 | ANWESHA CONSTRUCTION | 31.38 | 0.00 | 100 | |||
| 494 | Burdwan Division | Providing leftout water tap connection in different villages for 100% coverage to make it Sajal Gram from existing distribution system within scheme jurisdiction of different Piped Water Supply Schemes within Jamalpur Block (Paratal-II, Berugram, Abujhati & Chakdighi G.P.) under Burdwan Division, PHE. Dte. (Part-B). | ORD/000345/2021-2022 | 40/BWD | 05/01/2022 | 30 | PREMANANDA ROY BISWAS | 22.68 | 0.00 | 1 | |||
| 495 | Burdwan Division | Providing FHTC in Purba Kashiara village for 100% coverage in Sajal Gram from existing distribution system within RAIPUR PWSS, Bardhhaman-II Development Block under Burdwan Division, PHE Dte. Gr.E. | ORD/000345/2022-2023 | 1368/BSD | 04/08/2022 | 5 | ASHOK KUMAR GHOSH | 0.68 | 0.00 | 0 | |||
| 496 | Burdwan Division | Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of SIALI Piped Water Supply Scheme at Mudipur (Part), Rasalatpur (Part) Village (Mouza), Jamalpur Block under Burdwan Division, PHE Dte. | ORD/000346/2021-2022 | 58/BWD | 05/01/2022 | 30 | BOSE ENTERPRISE | 18.34 | 0.00 | 1 | |||
| 497 | Burdwan Division | Providing Balance Functional Household Tap Connection (FHTC)for Swajal Gram from existing distribution system within the command area of Idilpur & Fakirpur village under Fakirpur Piped W/S.Scheme under Burdwan-I Block of Burdwan Sub-Division under Burdwan Division, PHE Dte. Gr. I | ORD/000346/2022-2023 | 1380/BSD | 05/08/2022 | 5 | BAMDEB CONSTRUCTION & CO | 0.96 | 0.00 | 100 | |||
| 498 | Burdwan Division | Continuation work order for Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Hatgobindapur village of Hatgobindapur piped water supply scheme within Burdwan Sub-Division under Burdwan Division, PHE Dte. [Phase-I](Tr No.-317/BWD/2020-21) | ORD/000347/2020-2021 | 3702/BWD | 05/10/2020 | 30 | M/S ASHA CONSTRUCTION | 4.92 | 4.92 | 1 | |||
| 499 | Burdwan Division | Providing FHTC in Jarul village for 100% coverage in Sajal Gram from existing distribution system within SUHARI PWSS, Bardhhaman-II Development Block under Burdwan Division, PHE Dte.(Part-A). Gr.K. | ORD/000347/2022-2023 | 1381/BWD | 05/08/2022 | 5 | SAMANTA CONSTRUCTION | 0.96 | 0.00 | 0 | |||
| 500 | Burdwan Division | Continuation work order for supply of 10 mm NB Gun-Metal /Brass Ferrul conforming to IS:2692-1989 for water tap connection in each household from existing distribution system within scheme jurisdiction in different piped water supply scheme within Durgapur (Bardhaman North) Sub-Division under Burdwan Division, PHE Dte. and delivered at Barsul Divisional Store.[Part-7] | ORD/000348/2021-2022 | 2942/BWD | 04/05/2021 | 10 | KISHORE GHOSH | 3.94 | 0.00 | 1 | |||
| 501 | Burdwan Division | Providing FHTC in Shuhari village for 100% coverage in Sajal Gram from existing distribution system within SUHARI PWSS, Bardhhaman-II Development Block under Burdwan Division, PHE Dte.(Part-A).Gr.M. | ORD/000349/2022-2023 | 1383/BSD | 05/08/2022 | 5 | SAMANTA CONSTRUCTION | 0.97 | 0.00 | 0 | |||
| 502 | Burdwan Division | Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Khetpur Palashi (Part-A) village of Khetpur Palashi piped water supply scheme within Katwa Sub-Division under Burdwan Division, PHE Dte. (Tr No.-471/BWD/2020-21) | ORD/000350/2020-2021 | 241/KTS | 01/10/2020 | 4 | CHANCHAL PAL | 1.19 | 1.17 | 1 | |||
| 503 | Burdwan Division | Providing FHTC in Atagar village for 100% coverage in Sajal Gram from existing distribution system within SUHARI PWSS Bardhhaman-II Development Block under Burdwan Division, PHE Dte. Gr.O. | ORD/000351/2022-2023 | 1390/BSD | 08/08/2022 | 5 | SAMANTA CONSTRUCTION | 0.56 | 0.00 | 0 | |||
| 504 | Burdwan Division | Extension of pipeline including providing FHTC for SIPTAI Piped Water Supply Scheme at Pirijpur 40 No¿s Habitation for Sajal Gram (As per FIELD VERIFICATION REPORT FOR HAR GHAR JAL CERTIFICATION within Jamalpur under Burdwan Division, PHE Dte. Gr.Q. | ORD/000353/2022-2023 | 1392/BSD | 08/08/2022 | 5 | ROY CONSTRUCTION | 0.95 | 0.00 | 1 | |||
| 505 | Burdwan Division | Extension of pipeline including providing FHTC for SIPTAI Piped Water Supply Scheme at Siptai (42 Nos) Habitation for Sajal Gram (As per FIELD VERIFICATION REPORT DULY SIGNED BY PRADHAN FOR HAR GHAR JAL CERTIFICATION) within Jamalpur Block under Burdwan Division, PHE Dte. Gr.R | ORD/000354/2022-2023 | 1393/BSD | 08/08/2022 | 5 | ROY CONSTRUCTION | 0.97 | 0.00 | 100 | |||
| 506 | Burdwan Division | Continuation work order for Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Denur village of Putsuri piped water supply scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. [Phase-I](Tr No.-562/BWD/2020-21) | ORD/000355/2020-2021 | 3804/BWD | 08/10/2020 | 30 | IJABUL SEKH | 4.92 | 4.92 | 1 | |||
| 507 | Burdwan Division | Extension of pipeline including FHTC for Siptai Piped Water Supply Scheme at Ilampur (30 Nos) habitation for Sajal Gram (As per FIELD VERIFICATION REPORT DULY SIGNED BY PRADHAN FOR HAR GHAR JAL CERTIFICATION) within Jamalpur Block under Burdwan Division, PHE Dte. Gr.S. | ORD/000355/2022-2023 | 1394/BSD | 08/08/2022 | 5 | ROY CONSTRUCTION | 0.96 | 0.00 | 1 | |||
| 508 | Burdwan Division | Continuation work order for Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Gopalpur village of Sultanpur piped water supply scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. [Phase-I](Tr No.-339/BWD/2020-21) | ORD/000356/2020-2021 | 3700/BWD | 05/10/2020 | 30 | BISWAS ENTERPRISE | 4.91 | 4.91 | 1 | |||
| 509 | Burdwan Division | Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Ekaihat & Bikaihat (Part-B) village of Ekaihat & Bikaihat piped water supply scheme within Katwa Sub-Division under Burdwan Division, PHE Dte. (Tr No.-539/BWD/2020-21) | ORD/000357/2020-2021 | 237/KTS | 30/09/2020 | 4 | JAGADANANDAPUR CO. OP. LABOUR CONTRACT AND CONSTRUCTION SOCIETY LTD. | 1.32 | 1.32 | 1 | |||
| 510 | Burdwan Division | Providing FHTC and extension of UPVC distribution pipeline at Raipur, Gumri, Namalpur & Mahipal habitation for RAIPUR Piped Water Supply Scheme at Burdwan - II Development Block under Burdwan Division, PHE Dte. | ORD/000358/2021-2022 | 104/BWD | 06/01/2022 | 30 | ROY CONSTRUCTION | 23.65 | 0.00 | 1 | |||
| 511 | Burdwan Division | Plinth protection and uplift of inner side of base floor of OHR and construction of sluice valve chamber at LOHAI PWSS at Raina-II Block under Burdwan Division PHE Dte. [Group : B] | ORD/000359/2022-2023 | 446/AE/HQ | 16/08/2022 | 30 | INDIAN ENGINEERS CO.-OPERATIVE SOCIETY LTD. | 1.91 | 0.00 | 1 | |||
| 512 | Burdwan Division | Construction of balance portion of boundary wall at H/W SITE of HIRANYAGRAM Piped W/S. Scheme under Burdwan Division PHE Dte. [Group : C] | ORD/000360/2022-2023 | 447/AE/HQ | 16/08/2022 | 30 | APORUPA CONSTRUCTION | 2.98 | 0.00 | 1 | |||
| 513 | Burdwan Division | Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of AMARUN (Z-II) Piped Water Supply Scheme at Hanrgram (4 Nos. Habs.), Erachya (6 Nos. Habs.) Village (Mouza), Bhatar Block under Burdwan Division, PHE Dte. | ORD/000363/2021-2022 | 7157/BWD | 24/12/2021 | 60 | S.S. CONSTRUCTION | 76.46 | 0.00 | 1 | |||
| 514 | Burdwan Division | Preparation and Submission of DPR for Augmentation of MADHABPUR PWSS under Jamalpur Development Block under Burdwan Division, P.H.E Dte.[2nd Call] | ORD/000363/2023-2024 | 1525/BSD | 17/07/2023 | 15 | CARTO | 0.78 | 0.00 | 100 | |||
| 515 | Burdwan Division | Providing leftout water tap connection in different villages for 100% coverage to make it Sajal Gram from existing distribution system within scheme jurisdiction of different Piped Water Supply Schemes within Purbasthali ¿ II Block under Burdwan Division, PHE. Dte. | ORD/000365/2021-2022 | 149/BWD | 07/01/2022 | 30 | G.S. CONSTRUCTION & CO. | 22.15 | 0.00 | 1 | |||
| 516 | Burdwan Division | Providing leftout water tap connection in different villages for 100% coverage to make it Sajal Gram from existing distribution system within scheme jurisdiction of different Piped Water Supply Schemes within Ausgram-I Block under Burdwan Division, PHE. Dte. | ORD/000366/2021-2022 | 120/BWD | 07/01/2022 | 30 | ANIRUDDHA FARUQUE | 12.33 | 0.00 | 1 | |||
| 517 | Burdwan Division | Providing FHTC for 100% coverage at Palsha (30 nos) & Begut (13nos) and special repairing of Nabastha, Begut & Palsha village for Nabastha Piped W/S scheme , Bardhhaman-II Dev. Block under Burdwan Division, PHE Dte" Gr.C. | ORD/000366/2022-2023 | 1405/BSD | 10/08/2022 | 212 | M/S ASHA CONSTRUCTION | 4.71 | 0.00 | 100 | |||
| 518 | Burdwan Division | Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Kashipur (Part) village (Sahebganj (P) habitation) of Kashipur Piped Water Supply Scheme within Durgapur Sub-Divn. under Burdwan Division, PHE. Dte. [SL. No. : 16] [Agree Ment No.719/BWD of 2020-21] | ORD/000368/2020-2021 | 1440/BWD | 18/02/2021 | 15 | THREE MAA ENTERPRISE | 4.52 | 4.08 | 1 | |||
| 519 | Burdwan Division | Continuation work order for Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Natungram village and Natungram, Daspara, Palpara habitation of Lohana piped water supply scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. [Phase-I](Tr No.-475/BWD/2020-21) | ORD/000370/2020-2021 | 4781/BWD | 02/12/2020 | 30 | PARTHA PRATIM ACHARYA | 2.95 | 2.95 | 1 | |||
| 520 | Burdwan Division | Special maintenance and construction of sluice Valve chamber at Uddharanpur Piped water Supply Scheme at Ketugram-II Block, under Katwa Sub-Division within Burdwan Division PHE Dte.[Sl No-2] | ORD/000370/2023-2024 | 611/KTS | 19/06/2023 | 30 | BABUL SK | 0.97 | 0.00 | 100 | |||
| 521 | Burdwan Division | Providing functional household tap connection from existing distribution system within the command area of Abujhati piped water supply scheme at Napara, Panchshimul & Siromani village Jamalpur Block under Burdwan Division, PHE Dte. (Tr No.-627/BWD/2020-21) | ORD/000371/2020-2021 | 954/BWD | 03/02/2021 | 45 | KOUSIK MALLICK | 38.90 | 38.58 | 1 | |||
| 522 | Burdwan Division | Providing leftout water tap connection in different villages for 100% coverage to make it Sajal Gram from existing distribution system within scheme jurisdiction of different Piped Water Supply Schemes within Memari-I Block (Daluibazar-II, Gopegantar-I & II G.P.) under Burdwan Division, PHE. Dte. Dte._Part-A. | ORD/000371/2021-2022 | 209/BWD | 11/01/2022 | 30 | M/S ANAND CONSTRUCTION | 21.11 | 0.00 | 1 | |||
| 523 | Burdwan Division | Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Jhaudanga village and North Jhaudanga (Part) habitation of Jhaudanga piped water supply scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. [Phase-I](Tr No.-761/BWD/2020-21) | ORD/000372/2020-2021 | 4113/BWD | 16/10/2020 | 30 | BARDHAMAN AQUA ENGINEERING | 4.86 | 4.86 | 1 | |||
| 524 | Burdwan Division | Construction of valve Chamber and supply of sluice valve at Sudpur PWSS under Katwa-I Block under Katwa Sub-Division under Burdwan Division, PHE Dte.[Sl No-4] | ORD/000372/2023-2024 | 671/KTS | 22/06/2023 | 30 | HAMID SK | 0.93 | 0.00 | 100 | |||
| 525 | Burdwan Division | Continuation work order for Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Jhaudanga village and North Jhaudanga (Part) habitation of Jhaudanga piped water supply scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. [Phase-I](Tr No.-762/BWD/2020-21) | ORD/000373/2020-2021 | 4795/BWD | 03/12/2020 | 30 | BARDHAMAN AQUA ENGINEERING | 3.51 | 3.51 | 1 | |||
| 526 | Burdwan Division | Providing FHTC from dist. System within the command area of GOBINDAPUR Piped Water Supply Scheme at Gobindapur (Part), Ichabacha, Taherpur, Dangapara, Purba Kashiara (Part), Matdanga, Chilinda, Sitarampur Village at Memari-I Development Block under Burdwan Division, PHE Dte. | ORD/000373/2021-2022 | 210/BWD | 11/01/2022 | 30 | A R TRADERS | 28.37 | 0.00 | 1 | |||
| 527 | Burdwan Division | Supplying and laying inter-connection from Pump no.-3 to rising main of Sudpur PWSS under Katwa Sub-Division under Burdwan Division, PHE Dte.[Sl No-5] | ORD/000373/2023-2024 | 672/KTS | 22/06/2023 | 30 | HAMID SK | 0.93 | 0.00 | 100 | |||
| 528 | Burdwan Division | Laying Parallel Pipeline to improve drinking water supply, Construction of Boundary wall, Path Way, Drain at Head Work Site and providing leftout FHTC, Road Restoration with allied work for NATU Piped Water Supply Scheme, Block-Raina-I within Burdwan Sub-Division under Burdwan Division, PHE Dte. | ORD/000373/2024-2025 | 2994/BWD | 01/08/2024 | 487 | ANWESHA CONSTRUCTION | 55.19 | 0.00 | 75 | |||
| 529 | Burdwan Division | Different type of works related (Internal pathways and approach road 2nd pump, Land-Development, FHTC, repair of boundary wall & pump houses and road restoration) under RAIPUR PWSS under Burdwan-II Block under Burdwan Division, PHE Dte. | ORD/000374/2024-2025 | 2995/BWD | 01/08/2024 | 184 | PRATIVA CONSTRUCTION | 11.79 | 0.00 | 80 | |||
| 530 | Burdwan Division | Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Kashipur (Part) village (Kashipur habitation) of Kashipur Piped Water Supply Scheme within Durgapur Sub-Divn. under Burdwan Division, PHE. Dte. [SL. No. : 18] [Agr. No. 720/BWD of 2020-2021] | ORD/000375/2020-2021 | 1441/BWD | 18/02/2021 | 15 | PREMANANDA ROY BISWAS | 4.48 | 4.03 | 1 | |||
| 531 | Burdwan Division | Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Dumo village (Dumo habitation) & Satgoria village (Satgoria habitation) of Madhabpur Piped Water Supply Scheme within Burdwan Sub-Divn. under Burdwan Division, PHE. Dte. [SL. No. : 07] [Agr. No.721/BWD of 2020-2021] | ORD/000376/2020-2021 | 1418/BWD | 18/02/2021 | 15 | BRINDABAN KONAR | 4.86 | 4.86 | 1 | |||
| 532 | Burdwan Division | Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Adra village (Adrahati habitation) of ADRA Piped Water Supply Scheme within Durgapur Sub-Divn. under Burdwan Division, PHE. Dte. (Part - A) [SL. No. : 05] [Agr. No. 745/BWD of 2020-2021] | ORD/000379/2020-2021 | 584/BWD | 25/01/2021 | 15 | GENUINE ENGINEERING CO-OP. SOCIETY LTD. | 4.86 | 4.86 | 1 | |||
| 533 | Burdwan Division | Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of Joykrishnapur Piped Water Supply Scheme at Joykrishnapur (4 Nos Habitation), Pilgram & Taranagar (2 Nos Habitation) Village (Mouza), Galsi-II Block under Burdwan Divn., PHE Dte.[Agreement No. 609/BWD OF 2020-2021] | ORD/000380/2020-2021 | 752/BWD | 29/01/2021 | 45 | SUDHAMAY MAJUMDAR | 43.97 | 30.35 | 1 | |||
| 534 | Burdwan Division | Providing Left-Out FHTC to Pallar Habitation within Bhatar Zone-I PWSS, within Durgapur (Burdwan North) Sub-Division, PHE Dte, under Burdwan Division, PHE Dte. | ORD/000380/2023-2024 | 555/DSD | 20/07/2023 | 30 | TARAMA AGENCY | 4.22 | 0.00 | 100 | |||
| 535 | Burdwan Division | Providing Left-Out FHTC to Katari Habitation within Bhatar Zone-II PWSS, within Durgapur (Burdwan North) Sub-Division, PHE Dte, under Burdwan Division, PHE Dte. | ORD/000381/2023-2024 | 556/DSD | 20/07/2023 | 30 | BIPLAB SAMANTA | 3.98 | 0.00 | 100 | |||
| 536 | Burdwan Division | Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Amarun village and Amarun habitation of Amarun piped water supply scheme within Durgapur (Bardhaman North) Sub-Division under Burdwan Division, PHE Dte. [Phase-I](Tr No.-805/BWD/2020-21) | ORD/000382/2020-2021 | 3345/BWD | 18/09/2020 | 30 | BHARAT CONSTRUCTION | 4.87 | 4.87 | 1 | |||
| 537 | Burdwan Division | Providing Left-Out FHTC to Eruar Habitation within ERUAR PWSS, within Durgapur (Burdwan North) Sub-Division, PHE Dte, under Burdwan Division, PHE Dte. | ORD/000382/2023-2024 | 557/DSD | 20/07/2023 | 30 | SANDIPAN SENGUPTA | 4.44 | 0.00 | 0 | |||
| 538 | Burdwan Division | Continuation work order for Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Amarun village and Amarun habitation of Amarun piped water supply scheme within Durgapur (Bardhaman North) Sub-Division under Burdwan Division, PHE Dte. [Phase-I][Tr No.-508/BWD/20-21] | ORD/000383/2020-2021 | 4793/BWD | 03/12/2020 | 30 | BHARAT CONSTRUCTION | 4.87 | 4.80 | 1 | |||
| 539 | Burdwan Division | Land development and Construction of connecting road from PH to OHR at 1st tube well site of KAYRAPUR Water Supply Scheme (Part-B) within Durgapur Sub Division Under Burdwan Division, PHE Dte. | ORD/000383/2023-2024 | 558/DSD | 20/07/2023 | 30 | SAMANTA CONSTRUCTION | 4.84 | 0.00 | 0 | |||
| 540 | Burdwan Division | Providing Functional Household tap connection (FHTC) from existing distribution system within the command area of NABASTHA piped water supply scheme at Begut, Bodhpur, Chakundi, Nabastha & Palsha village, Burdwan-II Block under Burdwan Division, PHE Dte.[Tr No.-65/BWD/20-21] | ORD/000385/2020-2021 | 5003/BWD | 10/12/2020 | 90 | M/S ASHA CONSTRUCTION | 88.60 | 42.24 | 1 | |||
| 541 | Burdwan Division | Providing Functional Household tap connection (FHTC) from existing distribution system within the command area of ERUAR piped water supply scheme at Eruar (Part-B) (Eruar (Part-B) Habitation) village (Mouza), Bhatar Block under Burdwan Division, PHE Dte. [Tr No.-678/BWD/20-21] | ORD/000386/2020-2021 | 1264/BWD | 11/02/2021 | 30 | S.T. ENTERPRISE | 22.24 | 19.99 | 100 | |||
| 542 | Burdwan Division | Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of AMRA Piped Water Supply Scheme (Vill-Dogechia, Habitation- Dogechia ) at Jamalpur Block of Burdwan Sub-Division under Burdwan Division, PHE Dte.Gr.A. | ORD/000386/2021-2022 | 57/BSD | 13/01/2022 | 30 | DEY NIRMAN | 4.81 | 0.00 | 1 | |||
| 543 | Burdwan Division | Continuation work order for Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Jalahati village of Jalahati piped water supply scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. [Phase-I](Tr No.-768/BWD/2020-21) | ORD/000387/2020-2021 | 4793/1/BWD | 03/12/2020 | 30 | SETH ENTERPRISE | 4.92 | 4.92 | 1 | |||
| 544 | Burdwan Division | 225mm.Dia UPVC Pipeline at Node 11A to 11B of KAMARHATI(Zone-I)Water Supply Scheme within Raina-II Block , under Burdwan Division, PHE Dte. Gr.B. | ORD/000387/2021-2022 | 58/BSD | 13/01/2022 | 30 | INDIAN ENGINEERS CO.-OPERATIVE SOCIETY LTD. | 2.99 | 0.00 | 1 | |||
| 545 | Burdwan Division | Providing leftout water tap connection in different villages for 100% coverage to make it Sajal Gram from existing distribution system within scheme jurisdiction of different Piped Water Supply Schemes within Bhatar Block under Burdwan Division, PHE. Dte. | ORD/000389/2021-2022 | 268/BWD | 14/01/2022 | 30 | BHARAT CONSTRUCTION | 14.17 | 0.00 | 1 | |||
| 546 | Burdwan Division | Providing leftout water tap connection in different villages for 100% coverage to make it Sajal Gram from existing distribution system within scheme jurisdiction of different Piped Water Supply Schemes within Raina ¿ II Block under Burdwan Division, PHE. Dte. | ORD/000390/2021-2022 | 269/BWD | 14/01/2022 | 30 | PRONAB KUMAR DEY | 6.99 | 0.00 | 1 | |||
| 547 | Burdwan Division | Providing FHTC from the existing distribution line and special repair of existing different dia UPVC pipeline including supply of Sluice Valve for proper functioning the existing line of Sonarudra W/S Scheme of Purbasthali-I block within Kalna Sub-Division under Burdwan Division, PHE Dte. (Sl No-A) | ORD/000394/2021-2022 | 1260/KSD Dt-22.12.2021 | 22/12/2021 | 31 | BABUL SK | 4.14 | 0.00 | 1 | |||
| 548 | Burdwan Division | Laying of UPVC pipeline in TAWRA Habitation within Mahachanda PWSS WITHIN Durgapur(Burdwan North ) Sub Division ,PHE Dte, Under Burdwan Division PHE Dte. | ORD/000397/2024-2025 | 622/DSD | 05/08/2024 | 30 | MAA MAHAMAYA CONSTRUCTION | 4.54 | 0.00 | 100 | |||
| 549 | Burdwan Division | Providing Functional Household Tap Connection (FHTC)from distribution system within the command area of Kashipur water supply scheme at Kashipur Nurpur and Sahebganj village to make its Swajalgram under JAL JIBAN MISSION within Bhatar Block in Purba Bardhanan District undrer Burdwan Division, P.H.E. Dte. | ORD/000398/2024-2025 | 623/DSD | 05/08/2024 | 90 | RAM MOHAN MUKHERJEE | 3.15 | 0.00 | 0 | |||
| 550 | Burdwan Division | Replacement of 775 meter AC pipeline by using UPVC pipeline in Jaugram piped water supply scheme at Jamalpur Block under Burdwan Division PHE Dte.Gr.A. | ORD/000400/2021-2022 | 69/BSD | 14/01/2022 | 30 | MUKHERJEE ENTERPRISE | 4.83 | 0.00 | 1 | |||
| 551 | Burdwan Division | Extension of upvc distribution pipe line, s/valve chamber & conc. Work (Habitation-Belbagan,sutradharpara, Khanpukur & Adibasipara under Nari village) in regarding FHTC for Rayan water supply scheme at Bardhhaman-I Development Block under Burdwan Division, PHE Dte.Gr.B. | ORD/000401/2021-2022 | 70/BSD | 14/01/2022 | 30 | BRINDABAN KONAR | 4.64 | 0.00 | 1 | |||
| 552 | Burdwan Division | Laying of interconnection between tube well No 1 to 6 & OHR and OHR to distribution system for RAYAN & Its Adjoing Mouzas Water Supply Scheme within Bardhaman I Dev. Block , under Burdwan Division, PHE Dte.Gr.C. | ORD/000402/2021-2022 | 71/BSD | 14/01/2022 | 30 | BRINDABAN KONAR | 4.81 | 0.00 | 1 | |||
| 553 | Burdwan Division | Construction of valve chamber and necessary repairing work of pipeline for smooth running of HIRANYAGRAM Piped Water Supply Scheme, Jamalpur Dev. Block under Burdwan Division, P.H.E Dte. | ORD/000402/2023-2024 | 387/AE/HQ | 26/07/2023 | 30 | SANDIPAN SENGUPTA | 0.74 | 0.00 | 100 | |||
| 554 | Burdwan Division | Providing Functional Household Tap connection (FHTC) from existing distribution system within the command area of Saktigarh Piped water supply scheme at Shaktigarh village, Burdwan-II Block under Burdwan Division, PHE Dte. [Tr No.-101/SE/CC/2020-21] | ORD/000403/2020-2021 | 715/BWD | 28/01/2021 | 60 | SARKAR AGENCY | 62.17 | 17.35 | 1 | |||
| 555 | Burdwan Division | Providing Functional Household tap connection (FHTC) from existing distribution system within the command area of Abujhati piped water supply scheme at Astai, Dastanpur & Keotara village (Mouza), Jamalpur Block under Burdwan Division, PHE Dte. [Tr No.-624/BWD/20-21] | ORD/000404/2020-2021 | 955/BWD | 03/02/2021 | 45 | BHARAT CONSTRUCTION | 41.04 | 39.68 | 1 | |||
| 556 | Burdwan Division | Providing Functional Household tap connection (FHTC) from existing distribution system within the command area of Kulti piped water supply scheme at Chagram village (Chagram habitation), Dakshin Krishnapur village (Krishnapur habitation), Kala village (Anandanagar, Baganpara, Kala & Saklompur habitation), Kulti village (Dhapaspara & Kulti habitation), Dampara village (Dampara habitation) & Kashipur village (Kashipur habitation), Kalna-II Block under Burdwan Division, PHE Dte.[Tr No.-108/SE/CC/20-21] | ORD/000405/2020-2021 | 1130/BWD | 09/02/2021 | 60 | UMWELT ENGINEER PVT LTD | 103.15 | 31.07 | 1 | |||
| 557 | Burdwan Division | Providing leftout water tap connection in different villages for 100% coverage to make it Sajal Gram from existing distribution system within scheme jurisdiction of different Piped Water Supply Schemes within Khandaghosh Block under Burdwan Division, PHE. Dte. | ORD/000405/2021-2022 | 283/BWD | 17/01/2022 | 30 | J. K. CORPORATION | 11.88 | 0.00 | 1 | |||
| 558 | Burdwan Division | Extension of pipeline for KANSHRA Piped Water Supply Scheme at Badalpur & Natungram (Habitation) in Jamalpur Development Block for providing water tap connection (FHTC) under Burdwan Division, PHE Dte. | ORD/000406/2023-2024 | 421/AE/HQ | 02/08/2023 | 30 | DEBASHISH ENTERPRISE | 0.95 | 0.00 | 100 | |||
| 559 | Burdwan Division | Providing leftout water tap connection in different villages for 100% coverage to make it Sajal Gram from existing distribution system within scheme jurisdiction of different Piped Water Supply Schemes within Mongalkote Block under Burdwan Division, PHE. Dte. | ORD/000407/2021-2022 | 284/BWD | 17/01/2022 | 30 | BABUL SK | 6.81 | 0.00 | 1 | |||
| 560 | Burdwan Division | Re-Laying of UPVC Pipeline (Damaged by Irrigation Department) at Dakshin Mohanpur Habitation under ANTPARA Piped Water Supply Scheme, Jamalpur Development Block under Burdwan Division, PHE Dte. | ORD/000407/2023-2024 | 400/AE/HQ | 28/07/2023 | 30 | J K CORPORATION | 0.96 | 0.00 | 100 | |||
| 561 | Burdwan Division | Laying of UPVC Pipeline at Daspur Habitation under ANTPARA Piped Water Supply Scheme, Jamalpur Development Block under Burdwan Division, PHE Dte. | ORD/000409/2023-2024 | 416/AE/HQ | 01/08/2023 | 30 | J K CORPORATION | 0.96 | 0.00 | 100 | |||
| 562 | Burdwan Division | Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Mahachanda village (Iymapara & Mahachanda (Part) habitation) of Mahachanda Piped Water Supply Scheme within Durgapur Sub-Divn. under Burdwan Division, PHE. Dte. [SL. No. : 01] | ORD/000411/2020-2021 | 577/BWD | 25/01/2021 | 15 | S. MONDAL | 4.86 | 0.00 | 1 | |||
| 563 | Burdwan Division | Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of Abujhati Piped Water Supply Scheme at Abujhati (Part) (3 Nos Habitation Part) & Ajapur (Part) (Abujhati Part Habitation) Village (Mouza), Jamalpur Block under Burdwan Division, PHE Dte. _2ND CALL. [Agreement No. 754/BWD OF 2020-2021] | ORD/000412/2020-2021 | 1740/BWD | 25/02/2021 | 45 | T.K. BANERJEE & CO. | 34.87 | 35.11 | 0 | |||
| 564 | Burdwan Division | Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Jalahati (P) village (Jalahati (P) habitation) of Jalahati Piped Water Supply Scheme within Kalna Sub-Divn. under Burdwan Division, PHE. Dte. [SL. No. : 26] | ORD/000413/2020-2021 | 1462/BWD | 18/02/2021 | 15 | BARDHAMAN AQUA ENGINEERING | 4.86 | 4.86 | 1 | |||
| 565 | Burdwan Division | Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Jalahati (P) village (Beltalapara habitation) of Jalahati Piped Water Supply Scheme within Kalna Sub-Divn. under Burdwan Division, PHE. Dte. (Part-B). [SL. No. : 25] | ORD/000414/2020-2021 | 1464/BWD | 18/02/2021 | 15 | YOUNG ENGINEERS CO.-OPERATIVE SOCIETY LTD. | 4.86 | 4.86 | 1 | |||
| 566 | Burdwan Division | Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Jalahati (P)village (Beltalapara habitation) of Jalahati Piped Water Supply Scheme within Kalna Sub-Divn. under Burdwan Division, PHE. Dte. (Part-A). [SL. No. : 24] | ORD/000415/2020-2021 | 1465/BWD | 18/02/2021 | 15 | SETH ENTERPRISE | 4.82 | 4.86 | 1 | |||
| 567 | Burdwan Division | Providing Functional Household Tap Connection (FHTC) from distribution system within the command area of ADRA Water Supply Scheme at Adra (Part), Mohara (Part), Kaitara and Patrahati village under JAL SAPNO MISSION under Galsi-II Block in Purba Bardhanan District under Burdwan Division, P.H.E. Dte. | ORD/000415/2021-2022 | 384/BWD | 20/01/2022 | 60 | SHUBHRA KANTI GHOSH | 69.37 | 0.00 | 1 | |||
| 568 | Burdwan Division | Formal Work Order for Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of Uddharanpur Piped Water Supply Scheme at Enayetpur, Naihati, Sankhai, Sitahati & Uddharanpur (1 No Habitation) Village (Mouza), Ketugram-II Block under Burdwan Division, PHE Dte. (Agreement No. 97/SE/CC/PHE/Dte of 2020-2021) | ORD/000416/2020-2021 | 913/BWD | 02/02/2021 | 60 | SATYANARAYAN ENGINEERS CO. OP. SOCIETY LTD. | 86.77 | 33.14 | 1 | |||
| 569 | Burdwan Division | Providing leftout water tap connection in different villages for 100% coverage in Sajal Gram from existing distribution system within scheme jurisdiction of different Piped Water Supply Schemes within Burdwan ¿ II Block under Burdwan Division, PHE. Dte. | ORD/000416/2021-2022 | 385/BWD | 20/01/2022 | 30 | BISWAS ENTERPRISE | 11.97 | 0.00 | 100 | |||
| 570 | Burdwan Division | Formal Work Order for Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of Gopikantapur Piped Water Supply Scheme at Kubajpur, Pranballabhpur (2 Nos Habitation) & Ramchandrapur Village (Mouza), Jamalpur Block under Burdwan Division, PHE Dte. [Agreement No. 98/SE/CC/PHE/Dte of 2020-2021.] | ORD/000417/2020-2021 | 914/BWD | 02/02/2021 | 60 | S.S. CONSTRUCTION | 62.95 | 0.00 | 1 | |||
| 571 | Burdwan Division | Extension of pipeline for Chhotobainan water supply scheme at Pahalanpur and Rupsara village within Raina-II Block under Burdwan Division, PHE Dte.[Gr.-C] | ORD/000418/2021-2022 | 1119/BSD | 24/08/2021 | 45 | BOSE ENTERPRISE | 4.67 | 0.00 | 1 | |||
| 572 | Burdwan Division | Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of Lohai Piped Water Supply Scheme at Arui, Dighra, Jotragob, Konerpur & Lohai Village (Mouza), Raina-II Block under Burdwan Division, PHE Dte. [Agreement No. 54/2020-2021 OF SE/CC/PHE. DTE.] | ORD/000419/2020-2021 | 4888/BWD | 07/12/2020 | 90 | M/S S. CHOUDHURY | 75.66 | 35.34 | 1 | |||
| 573 | Burdwan Division | Extension of UPVC distribution pipeline in connection with FHTC for Masagram (Zone-I) & adjoining mouzas water supply scheme at Jamalpur Development Block under Burdwan Division, PHE Dte.[Gr.-B] | ORD/000419/2021-2022 | 1112/BSD | 23/08/2021 | 45 | M/S ASHA CONSTRUCTION | 4.71 | 0.00 | 1 | |||
| 574 | Burdwan Division | Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Pubar (Part) village (Pubar (Part) habitation) of Pubar Piped Water Supply Scheme within Durgapur Sub-Divn. under Burdwan Division, PHE. Dte. [Sl. No. : ¿16¿] | ORD/000420/2020-2021 | 66/BWD | 05/01/2021 | 15 | SUBRATA GUPTA | 4.86 | 0.00 | 1 | |||
| 575 | Burdwan Division | Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Jargram (Part) village (Jargram (P) habitation) of Madhabpur Piped Water Supply Scheme within Burdwan Sub-Divn. under Burdwan Division, PHE. Dte. [SL. No. : 05] | ORD/000421/2020-2021 | 1416/BWD | 18/02/2021 | 15 | LAKSHMIKANTA DAS | 4.86 | 0.00 | 1 | |||
| 576 | Burdwan Division | Formal Work Order for Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of ORGRAM Piped Water Supply Scheme at Salkuni, Orgram (10 Nos Habitation), & Silakote Village (Mouza), Bhatar Block under Burdwan Division, PHE Dte._2ND CALL.(Agreement no. 102/SE/CC/PHE/Dte of 2020-2021) | ORD/000424/2020-2021 | 1086/BWD | 08/02/2021 | 90 | SUPER CO. OPERATIVE LABOUR CONTRACT AND CONSTRUCTION SOCIETY LTD. | 81.92 | 29.50 | 1 | |||
| 577 | Burdwan Division | Formal Work Order for providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of Golgram Piped Water Supply Scheme at Golgram Village (Mouza), Galsi-I Block under Burdwan Division, PHE Dte. [Agreement No. 100/SE/CC/PHE/Dte of 2020-2021.] | ORD/000425/2020-2021 | 638/BWD | 25/01/2021 | 60 | SHUBHRA KANTI GHOSH | 63.87 | 32.98 | 1 | |||
| 578 | Burdwan Division | Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Jougram village (Jougram habitation) of Jougram Piped Water Supply Scheme within Burdwan Sub-Divn. under Burdwan Division, PHE. Dte. (Part-B) [SL. No. : 13] | ORD/000427/2020-2021 | 592/BWD | 25/01/2021 | 15 | DEY NIRMAN | 4.84 | 4.84 | 0 | |||
| 579 | Burdwan Division | Conducting physical Household Survey at the IMIS reported village for HGJ certification and providing balance FHTC for Har Ghar Jal certification including conducting Gram Sabhas for different IMIS reported villages across the district under Burdwan Division, PHE Dte. | ORD/000428/2024-2025 | 3107/BWD | 12/08/2024 | 507 | TUBGRAM GRAMMYAK UNNAYAN SAMITY | 309.60 | 0.00 | 85 | |||
| 580 | Burdwan Division | Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Jougram village (Jougram habitation) of Jougram Piped Water Supply Scheme within Burdwan Sub-Divn. under Burdwan Division, PHE. Dte. (Part-A) [SL. No. : 12] (Agreement No. 671/BWD of 2020-21) | ORD/000429/2020-2021 | 591/BWD | 25/01/2021 | 15 | MUKHERJEE ENTERPRISE | 4.86 | 4.86 | 0 | |||
| 581 | Burdwan Division | Continuation work order for Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Jougram village (Jougram habitation) of Jougram Piped Water Supply Scheme within Burdwan Sub-Divn. under Burdwan Division, PHE. Dte. (Part-A) [SL. No. : 12] (Agreement no. 839/BWD of 2020-21) | ORD/000430/2020-2021 | 1397/BWD | 15/02/2021 | 15 | MUKHERJEE ENTERPRISE | 4.86 | 4.86 | 0 | |||
| 582 | Burdwan Division | Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of Chaksanjadi Piped Water Supply Scheme at Jamdaha, Haibatpur, Chalbalpur & Kanakpur Village (Mouza), Jamalpur Block under Burdwan Division, PHE Dte. (Agreement no. 791/BWD of 2020-2021) | ORD/000432/2020-2021 | 1795/BWD | 26/02/2021 | 45 | M/S GUPTA ENTERPRISE | 40.21 | 0.00 | 1 | |||
| 583 | Burdwan Division | Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of KANSHRA Piped Water Supply Scheme at Kalna (Kalnagram & Surakalna Habitation) Village (Mouza), Jamalpur Block under Burdwan Division, PHE Dte. [Agreement No. 639/BWD OF 2020-2021] | ORD/000433/2020-2021 | 989/BWD | 04/02/2021 | 60 | IJABUL SEKH | 22.09 | 0.00 | 1 | |||
| 584 | Burdwan Division | Laying of 140 mm dia HDPE Pipe from Bardangamore to Khardattapara more (Node No- 289A -289- 286) of Zone-III under Surface Based W/S Scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. (Sl No-A) | ORD/000433/2021-2022 | 84/KSD | 20/01/2022 | 30 | UNICON INDIA | 4.84 | 0.00 | 1 | |||
| 585 | Burdwan Division | Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of Gramdihi Piped Water Supply Scheme at Mandarbati, Gholada & Bigra Village (Mouza), Bhatar Block under Burdwan Division, PHE Dte. (Agreement no. 792/BWD of 2020-2021) | ORD/000434/2020-2021 | 1794/BWD | 26/02/2021 | 45 | M/S GUPTA ENTERPRISE | 41.94 | 0.00 | 1 | |||
| 586 | Burdwan Division | Withdrawing of 110 mm dia HDPE Pipeline and relaying of 140 mm dia HDPE Pipe from Naomatha more to Bordanga more (Node No- 291 to 289-289A) under Surface Based W/S Scheme (Zone-III) within Kalna Sub-Division under Burdwan Division, PHE Dte. (Sl No-B) | ORD/000434/2021-2022 | 87/KSD | 21/01/2022 | 30 | UNICON INDIA | 4.84 | 0.00 | 1 | |||
| 587 | Burdwan Division | Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of KANSHRA Piped Water Supply Scheme at Kanshra (Jorbandh & Kanshra Habitation) Village (Mouza), Jamalpur Block under Burdwan Division, PHE Dte.[Agreement No. 625/BWD OF 2020-2021] | ORD/000438/2020-2021 | 957/BWD | 03/02/2021 | 60 | DEBASHISH ENTERPRISE | 21.87 | 0.00 | 1 | |||
| 588 | Burdwan Division | Formal Work Order for Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of Gopikantapur Piped Water Supply Scheme at Bishnubati, Chakdighi & Dhapdhara Village (Mouza), Jamalpur Block under Burdwan Division, PHE Dte. [Agreement No. 96/SE/CC/PHE/Dte of 2020-2021.] | ORD/000439/2020-2021 | 716/BWD | 28/01/2021 | 45 | BHARAT CONSTRUCTION | 47.00 | 6.97 | 1 | |||
| 589 | Burdwan Division | Extension of pipe line of existing distribution system within the command area of Anguna Piped Water Supply Scheme, Anguna village within Raina-1 Block of Burdwan Sub Division under Burdwan Division,PHE Dte".Gr.A. | ORD/000439/2022-2023 | 1465/BSD | 25/08/2022 | 45 | ANWESHA CONSTRUCTION | 4.97 | 0.00 | 1 | |||
| 590 | Burdwan Division | Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of Nabagram Piped Water Supply Scheme at Ajhapur (Part) (Masagram Habitation), Village (Mouza), Jamalpur Block under Burdwan Division, PHE Dte. (Agreement No. 115/2020-2021 OF SE/CC/PHE. DTE.) | ORD/000440/2020-2021 | 1402/BWD | 15/02/2021 | 60 | M/S ASHA CONSTRUCTION | 67.11 | 36.94 | 1 | |||
| 591 | Burdwan Division | Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of Khetia Piped Water Supply Scheme at Simdali (P) village (09 Nos. (P) habs), Burdwan-I Block under Burdwan Division, PHE Dte. [Agreement No. 749/BWD OF 2020-2021] | ORD/000441/2020-2021 | 1496/BWD | 18/02/2021 | 60 | H SAMANTA | 52.60 | 0.00 | 1 | |||
| 592 | Burdwan Division | Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of PALLA Piped Water Supply Scheme at Palla(Paschim Palla Habitation Part)village(Mouza)Memari-I Block under Burdwan Division, PHE Dte.Gr.C | ORD/000441/2021-2022 | 199/BSD | 01/02/2022 | 30 | MUKHERJEE ENTERPRISE | 4.58 | 0.00 | 1 | |||
| 593 | Burdwan Division | Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of Khetia Piped Water Supply Scheme at Gopalbati village, Khetia village (04 Nos. habs) & Tentral village Burdwan-I Block under Burdwan Division, PHE Dte. [Agreement No. 748/BWD OF 2020-2021.] | ORD/000442/2020-2021 | 1495/BWD | 18/02/2021 | 45 | H SAMANTA | 29.16 | 15.96 | 1 | |||
| 594 | Burdwan Division | Providing Functional House Hold Tap Connection (FHTC) at Ajhapur village (Habitation,near Head Work Site)under AJHAPUR PWSS at Jamalpur Dev. Block of Burdwan Sub-Division under Burdwan Division,PHE Dte. Gr.D. | ORD/000442/2022-2023 | 1480/BSD | 25/08/2022 | 30 | T.K. BANERJEE & CO. | 3.33 | 0.00 | 1 | |||
| 595 | Burdwan Division | Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of KEUNTA Piped Water Supply Scheme at Kalui, Keunta, Kulpukur, Rathtala, Mandarpur, Rampur & Nandanpur habitation, Raina - I Block under Burdwan Division, PHE Dte. (Agreement No. 57/2020-2021 OF SE/CC/PHE. DTE.) | ORD/000443/2020-2021 | 4853/BWD | 04/12/2020 | 90 | SUPER SKILL | 95.71 | 37.89 | 1 | |||
| 596 | Burdwan Division | Construction of Balance portion of Boundary wall at Head Works Site of RASULPUR Water Supply scheme under MEMARI-I Block of Burdwan Division, PHE Dte. (Length -15.00 Mtr, Col-7 Nos). Gr.E. | ORD/000443/2022-2023 | 1481/BSD | 25/08/2022 | 30 | DEBASHISH ENTERPRISE | 1.95 | 0.00 | 100 | |||
| 597 | Burdwan Division | Laying of pipeline for ERUAR Piped Water Supply Scheme in Bhatar Block under Burdwan Division, PHE. Dte. | ORD/000443/2024-2025 | 3079/BWD | 09/08/2024 | 90 | SOUMYAVASH DAS | 5.01 | 0.00 | 0 | |||
| 598 | Burdwan Division | Continuation work order for Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Jougram village (Jougram habitation) of Jougram Piped Water Supply Scheme within Burdwan Sub-Divn. under Burdwan Division, PHE. Dte. (Part-B) [SL. No. : 13] | ORD/000444/2020-2021 | 1398/BWD | 15/02/2021 | 15 | DEY NIRMAN | 4.84 | 0.00 | 0 | |||
| 599 | Burdwan Division | Formal Work Order for Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of URA Piped Water Supply Scheme at Ura (1 No Part & 1 No Habitation), Sarul (2 Nos Habitation) & Adrahati Village (Mouza), Gaisi-II Block under Burdwan Division, PHE Dte..(Agreement No. 95/SE/CC/PHE/Dte of 2020-2021) | ORD/000445/2020-2021 | 1087/BWD | 08/02/2021 | 60 | M/S PURBASHA | 66.70 | 7.15 | 1 | |||
| 600 | Burdwan Division | Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of AGRADWIP Piped Water Supply Scheme at Agradwip, Babla danga, Gonsaidhowra, Saheb Nagar & Sarawaridhowra (Mouza), Katwa - II Block under Burdwan Division, PHE Dte. | ORD/000445/2021-2022 | 6253/BWD | 01/11/2021 | 60 | SHUBHRA KANTI GHOSH | 53.67 | 0.00 | 1 | |||
| 601 | Burdwan Division | Land Development at Jougram 4th T/W Site at Jamalpur Block under Burdwan Sub Division in Burdwan Division,PHE Dte. Gr.G. | ORD/000445/2022-2023 | 1487/BSD | 26/08/2022 | 30 | PANCHANAN CHAKROBORTY | 1.17 | 0.00 | 1 | |||
| 602 | Burdwan Division | Construction of 300 cum capacity 20 Mtr. staging height RCC Over Head Reservoir including pipe connection and cost of pipes, specials for Orgram (Zone-I) & it's adjoining mouzas W/S. scheme under Burdwan Division, P.H.E. Dte.Ref. Drawing No.PC-I/OHR/7/2012 Dated 07.06.2012. | ORD/000448/2021-2022 | 764/BWD | 07/02/2022 | 180 | S.N. ENTERPRISE | 67.98 | 0.00 | 0 | |||
| 603 | Burdwan Division | Providing Functional Household Tap Connection (FHTC) from distribution system within the command area of KAYRAPUR Water Supply Scheme (Part-B) at Billogram, Brajapur, Asinda and Noada village under JAL SAPNO MISSION under Ausgram-I Block in Purba Bardhanan District under Burdwan Division, P.H.E. Dte. | ORD/000450/2021-2022 | 860/BWD | 11/02/2022 | 60 | ASHOK KUMAR GHOSH | 95.90 | 0.00 | 1 | |||
| 604 | Burdwan Division | Restoration of damaged concrete road in connection with laying distribution system at Laxmiganj, Gonna and Gopinathbati village within Dwariapur Piped Water Supply Scheme at Ausgram-I Block within Durgapur Sub-Division under Burdwan Division, PHE Dte. [Gr.-H] | ORD/000451/2021-2022 | 80/DSD | 11/02/2022 | 15 | RANADHIR SINHA | 4.73 | 0.00 | 1 | |||
| 605 | Burdwan Division | Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Mahachanda village (Shibpur-Dharampur habitation) of Mahachanda Piped Water Supply Scheme within Durgapur Sub-Divn. under Burdwan Division, PHE. Dte. [SL. No. : 02] | ORD/000453/2020-2021 | 578/BWD | 25/01/2021 | 15 | PRONAB KUMAR DEY | 4.86 | 0.00 | 1 | |||
| 606 | Burdwan Division | Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Nunari village (Patuna habitation) & Parhat village (Parhat habitation) of Mahachanda Piped Water Supply Scheme within Durgapur Sub-Divn. under Burdwan Division, PHE. Dte. (Part - A) [SL. No. : 03] | ORD/000454/2020-2021 | 582/BWD | 25/01/2021 | 15 | BIPLAB SAMANTA | 4.86 | 4.86 | 0 | |||
| 607 | Burdwan Division | Extension of Pipeline with providing Functional Household Tap Connection (FHTC) at Raibandh, Raykona & Kankora adibasipara of DEBSALA and its adjoining mouza's Piped W/S Scheme at Ausgram-II Block within Durgapur Sub Division under Burdwan Division, P.H.E. Dte. [Gr.-C] | ORD/000454/2021-2022 | 75/DSD | 11/02/2022 | 30 | BHARAT CONSTRUCTION | 4.33 | 0.00 | 1 | |||
| 608 | Burdwan Division | Laying of HDPE pipeline at Antpara village for dedicated water supply at Dakshinmohonpur village within Antpara PWSS, Block-Jamalpur under Burdwan Division, PHE Dte. [Group : A] | ORD/000455/2021-2022 | 65/AE/HQ | 11/02/2022 | 30 | SUPER SKILL | 4.68 | 0.00 | 1 | |||
| 609 | Burdwan Division | Extension of Pipeline with providing Functional Household Tap Connection (FHTC) at Debsala Village,Kankora & Pathuria Adibasipara of DEBSALA and its adjoining mouza's Piped W/S Scheme at Ausgram-II Block within Durgapur Sub Division under Burdwan Division, P.H.E. Dte. [Gr.-D] | ORD/000456/2021-2022 | 76/DSD | 11/02/2022 | 30 | D.M. ENTERPRISE | 4.45 | 0.00 | 1 | |||
| 610 | Burdwan Division | Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Muratipur village and Muratipur habitation of ERUAR Piped Water Supply Scheme within Durgapur (Burdwan North) Sub-Divn. under Burdwan Division, PHE. Dte. [Phase - I] [GROUP : ¿11B¿] | ORD/000457/2020-2021 | 4748/BWD | 01/12/2020 | 30 | S. MONDAL | 4.86 | 4.86 | 0 | |||
| 611 | Burdwan Division | Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Madhabpur (Part) village (Madhabpur (P) habitation) of Madhabpur Piped Water Supply Scheme within Burdwan Sub-Divn. under Burdwan Division, PHE. Dte. [SL. No. : 06] | ORD/000458/2020-2021 | 1417/BWD | 18/02/2021 | 15 | KAJAL MUKHERJEE | 4.86 | 0.00 | 1 | |||
| 612 | Burdwan Division | Providing Functional Household Tap Connection (FHTC) at Hiranyagram village within the command area of Hiranyagram Piped Water Supply Scheme at Jamalpur Block under Burdwan Division, PHE Dte. [Group : B] | ORD/000459/2021-2022 | 67/AE/HQ | 11/02/2022 | 30 | APORUPA CONSTRUCTION | 4.83 | 0.00 | 1 | |||
| 613 | Burdwan Division | Providing Functional Household Tap Connection (FHTC) at Kalna village within the command area of Kanshra Piped Water Supply Scheme at Jamalpur Block under Burdwan Division, PHE Dte. [Group : C] | ORD/000460/2021-2022 | 68/AE/HQ | 11/02/2022 | 30 | MAA BHABANI CONSTRUCTION | 4.81 | 0.00 | 1 | |||
| 614 | Burdwan Division | Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Mahachanda (Part) village (Aymapara & Mahachanda (P) habitation) of Mahachanda Piped Water Supply Scheme within Durgapur Sub-Divn. under Burdwan Division, PHE. Dte [SL. No. : 15] | ORD/000461/2020-2021 | 1466/BWD | 18/02/2021 | 15 | BARABELUN NO.-II G.P. UNEMPLOYED CO-OP LABOUR CONTRACT & CONSTRUCTION SOCIETY LTD. | 4.86 | 0.00 | 1 | |||
| 615 | Burdwan Division | Providing Functional Household Tap Connection (FHTC) at Nandanpur and Rampur village within the command area of Keunta Piped Water Supply Scheme at Raina-II Block under Burdwan Division, PHE Dte. [Group : D] | ORD/000461/2021-2022 | 69/AE/HQ | 11/02/2022 | 30 | SUPER SKILL | 4.16 | 0.00 | 1 | |||
| 616 | Burdwan Division | Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Adra village (Adrahati habitation) of ADRA Piped Water Supply Scheme within Durgapur Sub-Divn. under Burdwan Division, PHE. Dte. (Part - B) [SL. No. : 06] | ORD/000462/2020-2021 | 585/BWD | 25/01/2021 | 15 | BASUNDHARA SOLUTION | 4.86 | 0.00 | 1 | |||
| 617 | Burdwan Division | Continuation work order for Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Kalyanpur & Dangachha village of Nandra Piped Water Supply Scheme within Burdwan Sub-Divn. under Burdwan Division, PHE. Dte. [Phase - I] [GROUP : ¿10B¿] | ORD/000463/2020-2021 | 4085/BWD | 16/10/2020 | 30 | BHARAT CONSTRUCTION | 1.65 | 1.65 | 0 | |||
| 618 | Burdwan Division | Laying of parallel line with 90 mm dia uPVC pipe within Node 86-88 and providing air valve for improvement of water supply to FHTC at Pilgram village within Jaykrishnapur and its adjoining mouzas W/S Scheme under Durgapur Sub-Division, Burdwan Division, P.H.E. Dte. [Gr.-I) | ORD/000464/2021-2022 | 81/DSD | 11/02/2022 | 30 | TARAMA AGENCY | 3.12 | 0.00 | 1 | |||
| 619 | Burdwan Division | Providing Functional Household Tap Connection (FHTC) from existing distribution system at KHETIA Pipe Water Supply Scheme of Burdwan -I Block under Burdwan Sub-Division under Burdwan Division, PHE Dte. | ORD/000464/2022-2023 | 3963/BWD | 13/09/2022 | 30 | M/S UNIQUE | 6.23 | 0.00 | 1 | |||
| 620 | Burdwan Division | Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Hatgobindapur village (Part) of Hatgobindapur Piped Water Supply Scheme within Burdwan Sub-Divn. under Burdwan Division, PHE. Dte. [SL. No. : 01] | ORD/000465/2020-2021 | 1413/BWD | 18/02/2021 | 15 | M/S ASHA CONSTRUCTION | 4.86 | 4.86 | 0 | |||
| 621 | Burdwan Division | Extension of pipeline for KAMARHATI Water Supply Scheme FOR FHTC work at Jashapur village within Raina-II Block , under Burdwan Division, PHE Dte.Gr.C. | ORD/000465/2021-2022 | 276/BSD | 15/02/2022 | 30 | KOUSIK MALLICK | 4.99 | 0.00 | 1 | |||
| 622 | Burdwan Division | Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Kashipur village (Kashipur habitation) of Kashipur Piped Water Supply Scheme within Kalna Sub-Divn. under Burdwan Division, PHE. Dte. [SL. No. : 20] | ORD/000466/2020-2021 | 596/BWD | 25/01/2021 | 15 | IYASIN DAFADAR | 4.86 | 1.70 | 1 | |||
| 623 | Burdwan Division | Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Bhaturia village (Bhaturia habitation) of Bamungoria Piped Water Supply Scheme within Kalna Sub-Divn. under Burdwan Division, PHE. Dte. (Part-A). [SL. No. : 22] | ORD/000467/2020-2021 | 1461/BWD | 18/02/2021 | 15 | ABDUL HAI | 4.86 | 4.86 | 0 | |||
| 624 | Burdwan Division | Interconnection between Raising Main to OHR & OHR to distribution System with bypass arrangement for Palason Water Supply Scheme within Raina-I Block under Burdwan Division, PHE Dte._2ND CALL Gr.E. | ORD/000467/2021-2022 | 278/BSD | 15/02/2022 | 30 | S.S. ENTERPRISE | 3.23 | 0.00 | 1 | |||
| 625 | Burdwan Division | Laying of parallel line with 90 mm dia uPVC pipe within Node J8-J-48 and providing air valve for improvement of water supply to FHTC at Twara village within MAHACHANDA and its adjoining mouzas W/S Scheme under Durgapur Sub-Division, Burdwan Division, P.H.E. Dte. | ORD/000467/2022-2023 | 3967/BWD | 13/09/2022 | 30 | PAPRI HAZRA | 5.26 | 0.00 | 1 | |||
| 626 | Burdwan Division | Construction of Pump House cum chlorine room without sanitary and water supply arrangement at 3rd Tube Well Site (Baje Kumarpur) to departmental drawing no-PHE/BD/P.H/DRG/02/DEC-17(Size 3.60 mtr x 3.00 mtr room) for Chhotobainan its Adjoining Mouza W/S Scheme, block -Raina-II within Burdwan Sub-Division, PHE Dte. Gr.B. | ORD/000469/2022-2023 | 1526/BSD | 05/09/2022 | 60 | BRINDABAN KONAR | 3.03 | 0.00 | 1 | |||
| 627 | Burdwan Division | Providing functional household tap connection (FHTC) from existing distribution system within the command area of Nadanghat piped water supply scheme at Kundapara village (37 nos FHTC) & Nadanghat village (75 nos FHTC), Purbasthali-I Block within Kalna Sub-Division under Burdwan Division, PHE Dte. (Sl No-B) | ORD/000470/2021-2022 | 153/KSD | 15/02/2022 | 15 | MAA LAXMI ENTERPRISE | 4.51 | 0.00 | 1 | |||
| 628 | Burdwan Division | Continuation work order for Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Barwa village of Barwa piped water supply scheme within Burdwan Sub-Division under Burdwan Division, PHE Dte. [Phase-I](Tr No.-573/BWD/2020-21) | ORD/000471/2020-2021 | 4627/BWD | 25/11/2020 | 30 | M/S SAYAN CHAKRABORTY | 4.92 | 4.92 | 1 | |||
| 629 | Burdwan Division | Providing leftout water tap connection in different villages for 100% coverage to make it Sajal Gram from existing distribution system within scheme jurisdiction of different Piped Water Supply Schemes within Ausgram-II Block under Burdwan Division, PHE. Dte. | ORD/000472/2021-2022 | 940/BWD | 17/02/2022 | 30 | NANDY UDYOG | 11.82 | 0.00 | 0 | |||
| 630 | Burdwan Division | Continuation work order for Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Khetpur (Pt-A) village of Khetpur-Palashi piped water supply scheme within Katwa Sub-Division under Burdwan Division, PHE Dte. [Phase-I](Tr No.-257/BWD/2020-21) | ORD/000473/2020-2021 | 3528-A/BWD | 25/09/2020 | 30 | CHANCHAL PAL | 2.81 | 2.81 | 1 | |||
| 631 | Burdwan Division | Extension of pipeline for ISUFABAD Water Supply Scheme at KASIMPUR village within BURDWAN-I Block , under Burdwan Division, PHE Dte.Gr.A | ORD/000473/2021-2022 | 274/BSD | 15/02/2022 | 30 | SUPRIYA RAY | 4.98 | 0.00 | 1 | |||
| 632 | Burdwan Division | Continuation work order for Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Bikaihat & Ekaihat village of Ekaihat piped water supply scheme within Katwa Sub-Division under Burdwan Division, PHE Dte. [Phase-I](Tr No.-538/BWD/2020-21) | ORD/000474/2020-2021 | 3697/BWD | 05/10/2020 | 30 | JAGADANANDAPUR CO. OP. LABOUR CONTRACT AND CONSTRUCTION SOCIETY LTD. | 1.79 | 1.79 | 1 | |||
| 633 | Burdwan Division | Extensionof pipe linefor providing functional house hold tap connection at Ruppur village(Habitation)of RUPPUR Piped Water Supply Scheme Piped Water Supply Scheme within Burdwan Sub-Division under Burdwan Division,PHE Dte".Gr.B. | ORD/000474/2021-2022 | 275/BSD | 15/02/2022 | 30 | SAMANTA CONSTRUCTION | 4.82 | 0.00 | 1 | |||
| 634 | Burdwan Division | Replace damaged and chokaged various dia. A.C. Pipeline with UPVC pipes, construction of valve chambers and providing FHTC at mouza (Habitation) under JOUGRAM PWSS, Jamalpur Development Block of Burdwan Sub-Division under Burdwan Division, PHE Dte". Gr.B. | ORD/000475/2022-2023 | 1599/BSD | 14/09/2022 | 30 | MUKHERJEE ENTERPRISE | 3.38 | 0.00 | 1 | |||
| 635 | Burdwan Division | Providing leftout water tap connection in different villages for 100% coverage to make it Sajal Gram from existing distribution system within scheme jurisdiction of different Piped Water Supply Schemes within Kalna ¿ II Block under Burdwan Division, PHE. Dte. | ORD/000476/2021-2022 | 943/BWD | 17/02/2022 | 30 | UDYOG CONSTRUCTION | 5.27 | 0.00 | 100 | |||
| 636 | Burdwan Division | Pipeline with FHTC for Isufabad Water Supply Scheme at Fagupur village (15 Nos) of Burdwan-I Block, under Burdwan Division, PHE Dte. Gr.C. | ORD/000476/2022-2023 | 1600/BSD | 14/09/2022 | 30 | DUBE ENTERPRISE | 3.08 | 0.00 | 1 | |||
| 637 | Burdwan Division | Extension of Pipeline for Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of Mahachanda Piped Water Supply Scheme , Block- Bhatar within Durgapur (Burdwan North) Sub Division under Burdwan Division, P.H.E. Dte. [Gr.-D] | ORD/000478/2021-2022 | 97/DSD | 18/02/2022 | 30 | BIPLAB SAMANTA | 3.54 | 0.00 | 1 | |||
| 638 | Burdwan Division | Providing Functional Household Tap Connection(FHTC)from existing distribution pipe line system within command area of AJHAPUR Piped W/S Scheme at Ajhapur Habitation (Near Head Works Site), Jamalpur Development Block under Burdwan Division,PHE Dte. Gr.E. | ORD/000478/2022-2023 | 1602/BSD | 14/09/2022 | 30 | DEY NIRMAN | 4.03 | 0.00 | 1 | |||
| 639 | Burdwan Division | Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of MONDALGRAM Piped Water Supply Scheme at Bamunia (Part) (4 Nos. Habs.), Bhigobanpur, Halaodharpur (Part) (2 Nos. Habs.), Mondalgram (Part) (10 Nos. Habs.), Saragachi & Malamba Village (Mouza), Memari - II Block under Burdwan Division, PHE Dte. | ORD/000479/2021-2022 | 994/BWD | 21/02/2022 | 60 | SUPRIYA RAY | 61.24 | 0.00 | 70 | |||
| 640 | Burdwan Division | Continuation work order for Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Belari village of Kayrapur Piped W/S Scheme (Part-A) within Durgapur (Bardhaman North) Sub-Division under Burdwan Division, P.H.E. Dte. [Gr.-A] | ORD/000480/2021-2022 | 736/DSD | 28/12/2021 | 15 | M/S S. CHOUDHURY | 4.83 | 0.00 | 1 | |||
| 641 | Burdwan Division | Continuation work order for Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Kayrapur vilage of Kayrapur Piped W/S Scheme (Part-A) within Durgapur (Bardhaman North) Sub-Division under Burdwan Division, P.H.E. Dte. [Gr.-B] | ORD/000481/2021-2022 | 737/DSD | 28/12/2021 | 15 | M/S S. CHOUDHURY | 4.83 | 0.00 | 1 | |||
| 642 | Burdwan Division | Shifting & Relaying of 2nd T.Well Raising main and providing 5 nos (100mm dia) S/Valve at existing dist. Line for Raipur water supply scheme at Bardhhaman-II Development Block under Burdwan Division, PHE Dte. Group: H | ORD/000481/2022-2023 | 1605/BSD | 14/09/2022 | 30 | ASHOK KUMAR GHOSH | 1.72 | 0.00 | 0 | |||
| 643 | Burdwan Division | Construction of Boundary wall including land development, Pathway and plantation at Head works site of Natungram water supply scheme, Block-Ketugram-II under Katwa Sub-Division under Burdwan Division, PHE Dte. [Tr No.-347/BWD/20-21] | ORD/000482/2020-2021 | 4282/BWD | 03/11/2020 | 60 | MOJAI SK | 31.33 | 13.80 | 1 | |||
| 644 | Burdwan Division | Pipeline with FHTC for Isufabad Water Supply Scheme at ISUFABAD village (15 Nos) of Burdwan-I Block, under Burdwan Division, PHE Dte. Gr.J. | ORD/000483/2022-2023 | 1607/BSD | 14/09/2022 | 30 | DUBE ENTERPRISE | 1.89 | 0.00 | 1 | |||
| 645 | Burdwan Division | Concrete road at Head Work site Tubewell site of Jaugram Water Supply Scheme under JAMALPUR Block of Burdwan Division, PHE Dte. Gr.L | ORD/000484/2022-2023 | 1608/BSD | 14/09/2022 | 15 | DUBE ENTERPRISE | 1.70 | 0.00 | 1 | |||
| 646 | Burdwan Division | Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of JOTRAGHAB Piped Water Supply Scheme at (JOTKRISHTAI) Mouza under Jamalpur Block of Burdwan Sub-Division under Burdwan Division, PHE Dte. | ORD/000486/2022-2023 | 4007/BWD | 15/09/2022 | 30 | PAL CONSTRUCTION | 13.87 | 0.00 | 1 | |||
| 647 | Burdwan Division | Laying of uPVC pipe for providing FHTC at Itla Village within Itla Piped Water Supply Scheme, Jamalpur Block under Burdwan Division P.H.E Dte. [Group : E] | ORD/000489/2021-2022 | 66/AE/HQ | 11/02/2022 | 30 | MAUVE ENGINEERING AND SERVICES PVT LTD | 4.73 | 0.00 | 100 | |||
| 648 | Burdwan Division | Construction of concrete road and rest portion of Boundary Wall at Head Works Site of PALASON Water Supply Scheme under Raina-I Block of Burdwan Division,PHE Dte(Length-48.00 Mtr,Col-16 Nos)[Front Side]Gr.F. | ORD/000490/2021-2022 | 279/BSD | 15/02/2022 | 45 | NEW MANGES INDUSTRIAL CORPORATION | 4.12 | 0.00 | 1 | |||
| 649 | Burdwan Division | Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Jakra village and Jakra Paschimpara habitation of Satgachhia piped water supply scheme within Burdwan Sub-Division under Burdwan Division, PHE Dte. [Phase-I](Tr No.-383/BWD/2020-21) | ORD/000511/2020-2021 | 3328/BWD | 18/09/2020 | 30 | A R TRADERS | 4.86 | 4.86 | 0 | |||
| 650 | Burdwan Division | Providing functional household tap connection (FHTC) from existing distribution system within the command area of Mankar piped water supply scheme at Budbud (Part), Budbud habitation, Malikpara village (Malikpara habitation) & Bagabanpur village (Bagabanpur habitation), Galsi-I Block under Burdwan Division, PHE Dte. | ORD/000518/2020-2021 | 308/BWD | 14/01/2021 | 30 | RELIABLE ENGINEERS CO.-OPERATIVE CONSTRUCTION SOCIETY LTD. | 21.83 | 9.95 | 1 | |||
| 651 | Burdwan Division | Sinking of 300 X 200mm dia Tube Well 150 mtr. Depth by D.R. Rig method using UPVC pipe (CM) and UPVC Deep Well Screen (RMS) for Augmentation of PALSIT & its adjoining mouzas Piped Water Supply Scheme, Block - Burdwan - II, Dist - Purba Bardhaman under Burdwan Division, PHE Dte. | ORD/000523/2022-2023 | 4886/BWD | 02/11/2022 | 30 | WESTERN WATER SUPPLY AGENCY | 10.04 | 0.00 | 100 | |||
| 652 | Burdwan Division | Laying of Rising main in between Tube Well and Distribution Line for PUMP HOUSE 3 (RAIL LINE er dhar ) under BOLGONA PWSS in BHATAR Block under Durgapur Sub-Division under Burdwan Division, P.H.E. Dte. | ORD/000523/2025-2026 | 1019/DSD | 10/07/2025 | 15 | S.S. CONSTRUCTION | 0.82 | 0.00 | 0 | |||
| 653 | Burdwan Division | Sinking of 300 X 200mm dia Tube Well 150 mtr. Depth by D.R. Rig method using UPVC pipe (CM) and UPVC Deep Well Screen (RMS) for Augmentation of BALARAMPUR & its adjoining mouzas Piped Water Supply Scheme, Block - Jamalpur, Dist - Purba Bardhaman under Burdwan Division, PHE Dte. | ORD/000524/2022-2023 | 4887/BWD | 02/11/2022 | 30 | BIBHUTI SHAW | 10.07 | 0.00 | 100 | |||
| 654 | Burdwan Division | Laying Piper Line and FHTC for Gramdihi Jr. Basic School under Gramdihi Piped water supply Scheme , P.H.E Dte. Block:-Bhatar Dist: Purba Bardhaman | ORD/000524/2025-2026 | 1020/DSD | 10/07/2025 | 15 | INDIAN ENGINEERS CO.-OPERATIVE SOCIETY LTD. | 0.15 | 0.00 | 0 | |||
| 655 | Burdwan Division | Restoration of village Road dismantled by laying pipeline for providing FHTC near north side of Budbub Canal par colony under Mankar (Zone-I) Piped Water Supply Scheme under Galsi-I Block within Durgapur (Burdwan North) Sub Division under Burdwan Division, P.H.E. Dte. SL-01 | ORD/000527/2022-2023 | 646/DSD | 03/11/2022 | 21 | ROY CONSTRUCTION | 4.79 | 0.00 | 1 | |||
| 656 | Burdwan Division | Restoration of village Road dismantled by laying pipeline for providing FHTC Budbud Village, Girls School Para, Sukanta Nagar etc. under Mankar (Zone-I) Piped Water Supply Scheme under Galsi-I Block within Durgapur (Burdwan North) Sub Division under Burdwan Division, P.H.E. Dte. SL-02 | ORD/000528/2022-2023 | 647/DSD | 03/11/2022 | 21 | DEY NIRMAN | 4.80 | 0.00 | 1 | |||
| 657 | Burdwan Division | Construction of drain and pathway at Head work site of URA piped water supply scheme, Block-Galsi-II within Durgapur (Bardhaman North) Sub-Division, under Burdwan Division, PHE Dte. SL-03 | ORD/000529/2022-2023 | 648/DSD | 03/11/2022 | 30 | M/S PURBASHA | 3.66 | 0.00 | 1 | |||
| 658 | Burdwan Division | Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Bhaturia village (Bhaturia habitation) of Bamungoria Piped Water Supply Scheme within Kalna Sub-Divn. under Burdwan Division, PHE. Dte. (Part-B). [SL. No. : 23] | ORD/000530/2020-2021 | 1460/BWD | 18/02/2021 | 15 | SANTANU BHATTACHARYAY | 4.86 | 4.86 | 0 | |||
| 659 | Burdwan Division | Restoration of village Road dismantled by laying pipeline for providing FHTC at SUKDAL Village, near Sukdal Petrol and near Hindi School under Mankar (Zone-I) Piped Water Supply Scheme under Galsi-I Block within Durgapur (Burdwan North) Sub Division under Burdwan Division, P.H.E. Dte._2nd call SL-04 | ORD/000530/2022-2023 | 649/DSD | 03/11/2022 | 21 | PRATIVA CONSTRUCTION | 4.72 | 0.00 | 1 | |||
| 660 | Burdwan Division | Construction of 168 Mtr long P.C.C Approach road from Main Road to OHR site and inside boundary of OHR Site of MAHESHDANGA PWSS under Memari-I Development Block under Burdwan Division PHE Dte. | ORD/000530/2023-2024 | 3627/BWD | 21/08/2023 | 30 | MANAS BHATTACHARYA | 5.95 | 0.00 | 100 | |||
| 661 | Burdwan Division | Ground development, vertical extension of valve chamber, construction of pathway, drain etc. at Head work site of Mankar (Z-II) water supply scheme, Block-Galsi-I under Durgapur (Bardhaman North)Sub-Division under Burdwan Division, PHE Dte. SL-05 | ORD/000531/2022-2023 | 650/DSD | 03/11/2022 | 30 | SAIKAT RAY | 3.42 | 0.00 | 100 | |||
| 662 | Burdwan Division | Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Bhada village of Kayrapur Piped Water Supply Scheme within Durgapur Sub-Divn. under Burdwan Division, PHE. Dte.. [SL. No. : 20] | ORD/000532/2020-2021 | 1458/BWD | 18/02/2021 | 15 | M/S S. CHOUDHURY | 4.86 | 4.86 | 0 | |||
| 663 | Burdwan Division | Replacement of damage A.C. Pipeline at Mankar Bhattacharya Para & New royel club to Battala under Mankar(Zone-II) Piped Water Supply Scheme under Galsi-I Block within Durgapur (Burdwan North) Sub Division under Burdwan Division, P.H.E. Dte. SL-06 | ORD/000532/2022-2023 | 651/DSD | 03/11/2022 | 30 | OM ENTERPRISE | 4.72 | 0.00 | 1 | |||
| 664 | Burdwan Division | Construction of switch rooms & Rising main at different TW site for MADHABPUR (Zone-I) Piped Water Supply Scheme under Jamalpur Block, District:- Purba-Bardhaman under Burdwan Division, PHE. Dte. | ORD/000532/2023-2024 | 3629/BWD | 21/08/2023 | 60 | DEBJYOTI GOSWAMI | 9.11 | 0.00 | 80 | |||
| 665 | Burdwan Division | Providing functional household tap connection (FHTC) from existing distribution system within the command area of Raipur piped water supply scheme at Mahipal (05 Nos Habitation), Purba Kashiara (08 Nos. Habitation), Sahara (04 Nos. Habitation), Sonakur (07 Nos. Habitation), Baratpur (16 Nos, Habitation) & Raipur (10 Nos. Habitation) village, Bardhaman-II Block under Burdwan Division, PHE Dte. | ORD/000533/2020-2021 | 5007/BWD | 10/12/2020 | 90 | ASHOK KUMAR GHOSH | 43.99 | 22.41 | 1 | |||
| 666 | Burdwan Division | Replacement of damage A.C. Pipeline Mankar Pal Para & Nayakpara under Mankar(Zone-II) Piped Water Supply Scheme under Galsi-I Block within Durgapur (Burdwan North) Sub Division under Burdwan Division, P.H.E. Dte. SL-07 | ORD/000533/2022-2023 | 652/DSD | 03/11/2022 | 30 | SOUMYAVASH DAS | 4.55 | 0.00 | 1 | |||
| 667 | Burdwan Division | Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Kayrapur village of Kayrapur Piped Water Supply Scheme within Durgapur Sub-Divn. under Burdwan Division, PHE. Dte. [SL. No. : 19] | ORD/000534/2020-2021 | 1459/BWD | 18/02/2021 | 15 | M/S S. CHOUDHURY | 4.86 | 4.86 | 0 | |||
| 668 | Burdwan Division | Laying of damaged UPVC pipeline with HDPE pipes at Madhabpur village for Madhabpur Zone-I water supply scheme within Jamalpur Block under Burdwan Division, PHE Dte.[Gr.-G] | ORD/000534/2021-2022 | 1478/BSD | 09/11/2021 | 30 | KOUSIK MALLICK | 3.57 | 0.00 | 1 | |||
| 669 | Burdwan Division | Sinking of 300 X 200mm dia Tube Well 200 mtr. Depth by D.R. Rig method using UPVC pipe (CM) and UPVC Medium Well Screen (RMS) for Augmentation of JAGGESWARDIHI and its adjoining mouzas Piped Water Supply Scheme, Block Mongalkote, Dist - Purba Bardhaman under Burdwan Division, PHE Dte. | ORD/000535/2022-2023 | 4959/BWD | 09/11/2022 | 30 | ANIRUDDHA FARUQUE | 13.08 | 0.00 | 1 | |||
| 670 | Burdwan Division | Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Mirzapur village (Mirzapur habitation) of Madhabpur Piped Water Supply Scheme within Burdwan Sub-Divn. under Burdwan Division, PHE. Dte. [SL. No. : 10] | ORD/000536/2020-2021 | 1421/BWD | 18/02/2021 | 15 | JAI MAA DURGA & CO. | 4.86 | 4.86 | 0 | |||
| 671 | Burdwan Division | Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Koranji village of Kayrapur Piped Water Supply Scheme within Durgapur Sub-Divn. under Burdwan Division, PHE. Dte. [SL. No. : 21] | ORD/000537/2020-2021 | 1457/BWD | 18/02/2021 | 15 | M/S S. CHOUDHURY | 4.86 | 4.86 | 0 | |||
| 672 | Burdwan Division | Continuation work order for Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Sahahosenpur (Part) village (Sahahosenpur (Part) habitation) of Sahahosenpur Piped Water Supply Scheme within Burdwan Sub-Divn. under Burdwan Division, PHE. Dte. (Part - A) [Sl. No. : ¿17¿] | ORD/000539/2020-2021 | 816/BWD | 01/02/2021 | 15 | ROY BISWAS CONSTRUCTION | 4.86 | 0.00 | 1 | |||
| 673 | Burdwan Division | Sinking of 250 X 150mm dia Tube Well 150 mtr. Depth by D.R. Rig method using UPVC pipe (CM) and UPVC Medium Well Screen (RMS) for 2nd TW Site of Aug. of MAJHERGRAM & its adjoining mouzas Piped Water Supply Scheme, Block Monteswar, Dist - Purba Bardhaman under Burdwan Division, PHE Dte. | ORD/000542/2022-2023 | 5094/BWD | 17/11/2022 | 30 | DAS CONSTRUCTION | 8.71 | 0.00 | 1 | |||
| 674 | Burdwan Division | Providing FHTC (12 Nos.) and extension of UPVC distribution pipeline at Basatpur Habitation for Raipur water supply scheme at Burdwan-II Development Block under Burdwan Division, PHE Dte.[Gr.-A] | ORD/000543/2021-2022 | 1461/BSD | 01/11/2021 | 30 | ASHOK KUMAR GHOSH | 2.14 | 0.00 | 1 | |||
| 675 | Burdwan Division | Sinking of 300 X 200mm dia Tube Well 150 mtr. Depth by D.R. Rig method using UPVC pipe (CM) and UPVC Medium Well Screen (RMS) of ABUJHATI & its adjoining mouzas Piped Water Supply Scheme, Block - Jamalpur, Dist - Purba Bardhaman under Burdwan Division, PHE Dte. | ORD/000544/2022-2023 | 5125/BWD | 21/11/2022 | 30 | SUSUNIA GP CO. OPERATIVE LABOUR CONTRACT AND CONSTRUCTION SOCIETY LTD. | 11.23 | 0.00 | 1 | |||
| 676 | Burdwan Division | Dismantling of encroachments within Head work site of Mankar (Zone-II) Pipe Water Supply Scheme, at Galsi-I Block within Durgapur(Bardhaman North) Sub-Division under Burdwan Division, PHE Dte. [SL-A] | ORD/000545/2021-2022 | 130/DSD | 02/03/2022 | 3 | PARTHA RAY | 0.19 | 0.00 | 1 | |||
| 677 | Burdwan Division | Sinking of 300 X 200mm dia Tube Well 150 mtr. Depth by D.R. Rig method using UPVC pipe (CM) and UPVC Medium Well Screen (RMS) of AJHAPUR & its adjoining mouzas Piped Water Supply Scheme, Block - Jamalpur, Dist - Purba Bardhaman under Burdwan Division, PHE Dte. | ORD/000545/2022-2023 | 5124/BWD | 21/11/2022 | 30 | SUSUNIA GP CO. OPERATIVE LABOUR CONTRACT AND CONSTRUCTION SOCIETY LTD. | 11.24 | 0.00 | 1 | |||
| 678 | Burdwan Division | Beautification of PWSS with Arboriculture, Recharge Pit including shaft and anciliary works at AJHAPUR (Jamalpur Block) P.W.S.S under Burdwan Division, PHE Dte. | ORD/000545/2024-2025 | 276/RWS | 03/09/2024 | 10 | DEY NIRMAN | 0.91 | 0.00 | 0 | |||
| 679 | Burdwan Division | Sinking of 250 X 150mm dia Tube Well 150 mtr. Depth by D.R. Rig method using UPVC pipe (CM) and UPVC Deep Well Screen (RMS) for 2nd TW Site of KALYANPUR & its adjoining mouzas Piped Water Supply Scheme, Block ? Kalna ? II, Dist - Purba Bardhaman under Burdwan Division, PHE Dte. | ORD/000546/2022-2023 | 5128/BWD | 21/11/2022 | 30 | MUNSHI ENTERPRISE | 8.72 | 0.00 | 100 | |||
| 680 | Burdwan Division | Continuation work order for Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Sahapur (Part-B) village of Sahapur piped water supply scheme within Katwa Sub-Division under Burdwan Division, PHE Dte. [Phase-I](Tr No.-497/BWD/2020-21) | ORD/000547/2020-2021 | 4007/BWD | 14/10/2020 | 30 | DUBE ENTERPRISE | 2.84 | 2.84 | 0 | |||
| 681 | Burdwan Division | Beautification of PWSS with Land filling and arboriculture of Head Works site & 2nd pump house Gobindapur Pwss under memari-i Development Block under Burdwan Division, PHE Dte. | ORD/000547/2024-2025 | 278/RWS | 03/09/2024 | 10 | MUNSHI JAVEDUR JAMAN | 0.97 | 0.00 | 0 | |||
| 682 | Burdwan Division | Sinking of 250 X 150mm dia Tube Well 150 mtr. Depth by D.R. Rig method using UPVC pipe (CM) and UPVC Deep Well Screen (RMS) for 1ST TW Site of SRIRAMPUR & its adjoining mouzas Piped Water Supply Scheme, Block ? Purbasthali ? I, Dist - Purba Bardhaman under Burdwan Division, PHE Dte. | ORD/000548/2022-2023 | 5127/BWD | 21/11/2022 | 30 | M/S SYCHROTECH INDUSTRY | 8.73 | 0.00 | 0 | |||
| 683 | Burdwan Division | Work Order for "Repairing and laying of UPVC pipeline of Majida, Nimdaha, Lakshmipur and Ukhura village for smooth running of FHTC work of Surface Based Water Supply Scheme within Kalna Sub-Division under Burdwan Division, PHE Dte." | ORD/000548/2023-2024 | 1303/KSD | 23/08/2023 | 15 | PARTHA PRATIM ACHARYA | 1.00 | 0.00 | 100 | |||
| 684 | Burdwan Division | Interconnection of tube well no.-1 & Tube well No.-2 along with connection of existing OHR by 100 mm dia DI (K9) pipe and construction of sluice valve chamber of Sonarudra water supply scheme within Kalna Sub-Division, under Burdwan Division, PHE Dte. | ORD/000549/2020-2021 | 8/KSD | 05/01/2021 | 30 | BISWAS ENTERPRISE | 2.54 | 2.28 | 1 | |||
| 685 | Burdwan Division | Extension of pipeline for KAMARHATI Water Supply Scheme FOR FHTC work at Kamarhati village within Raina-II Block , under Burdwan Division, PHE Dte. (Zone-II). Gr.A. | ORD/000549/2021-2022 | 369/BSD | 02/03/2022 | 30 | DUBE ENTERPRISE | 4.98 | 0.00 | 1 | |||
| 686 | Burdwan Division | Beautification work at Head work, 2nd Pump house site of Surah Zone-I PWSS with Arboriculture, Recharge Pit including shaft and anciliary works at (Jamalpur Block) P.W.S.S under Burdwan Division, PHE Dte. | ORD/000549/2024-2025 | 280/RWS | 03/09/2024 | 10 | D.M. ENTERPRISE | 0.97 | 0.00 | 0 | |||
| 687 | Burdwan Division | Work Order for "Providing Functional house hold tap connections within command ares of Dharmadanga water supply scheme within Kalna-I Block under Kalna Sub-Division under Burdwan Division, PHE Dte." | ORD/000550/2023-2024 | 1305/KSD | 23/08/2023 | 15 | BISWAS ENTERPRISE | 2.81 | 0.00 | 100 | |||
| 688 | Burdwan Division | Beautification work at Head work, 2nd Pump house site of Surah Zone-II PWSS with Arboriculture, Recharge Pit including shaft and anciliary works at (Jamalpur Block) P.W.S.S under Burdwan Division, PHE Dte. | ORD/000550/2024-2025 | 281/RWS | 27/08/2024 | 10 | J.K. CORPORATION | 0.97 | 0.00 | 0 | |||
| 689 | Burdwan Division | Pipeline laying at different culvert crossing for damage of PMGSY Road of Sahhosenpur water supply scheme at Jamalpur Block under Burdwan Division, PHE Dte. [Gr.-F] | ORD/000552/2021-2022 | 1481/BSD | 09/11/2021 | 30 | ROY BISWAS CONSTRUCTION | 3.53 | 0.00 | 1 | |||
| 690 | Burdwan Division | Extension of pipeline for Sahhosenpur water supply scheme at Srikrishnapur and Rajarampur village within Jamalpur Block under Burdwan Division, PHE Dte.[Gr.-H] | ORD/000553/2021-2022 | 1483/BSD | 09/11/2021 | 30 | DIPAK ROY | 4.70 | 0.00 | 1 | |||
| 691 | Burdwan Division | Sinking of 300 X 200mm dia Tube Well 150 mtr. Depth by D.R. Rig method using UPVC pipe (CM) and UPVC Medium Well Screen (RMS) of MONDALGRAM & its adjoining mouzas Piped Water Supply Scheme, Block ? Memari ? II, Dist - Purba Bardhaman under Burdwan Division, PHE Dte. | ORD/000554/2022-2023 | 5196/BWD | 24/11/2022 | 30 | ANIRUDDHA FARUQUE | 11.24 | 0.00 | 1 | |||
| 692 | Burdwan Division | Work order for "Interconnection of rising main from 4th Tube Well site to Over Head Reservoir for FHTC related water supply under Putsuri W/S Scheme within Kalna Sub-Division under Burdwan Division , PHE Dte." | ORD/000554/2023-2024 | 1309/KSD | 23/08/2023 | 15 | PRONAB KUMAR DEY | 2.10 | 0.00 | 100 | |||
| 693 | Burdwan Division | Repairing of damage concrete work due to laying of pipeline at Keunta within Keunta water supply scheme under Burdwan Division, PHE Dte. [Gr.-G] | ORD/000556/2021-2022 | 1895/AE/HQ | 16/11/2021 | 30 | DUBE ENTERPRISE | 2.39 | 0.00 | 1 | |||
| 694 | Burdwan Division | Construction of Boundary wall at 3rd Tube well site of Dogachia Mouza of Amra water supply scheme under Jamalpur block under Burdwan Division, PHE Dte. [Length-59 Mtr][Gr.-F] | ORD/000557/2021-2022 | 1028/BSD | 05/08/2021 | 45 | MUKHERJEE ENTERPRISE | 4.45 | 0.00 | 1 | |||
| 695 | Burdwan Division | Construction of boundary wall at Head works site of Fakirpur water supply scheme under Bardhaman-I Block under Burdwan Division, PHE Dte.[Length-50.20 Mtr][Part-B][South & West Side][Gr.-C] | ORD/000558/2021-2022 | 1026/BSD | 05/08/2021 | 45 | AYSAN KHAN | 3.77 | 0.00 | 1 | |||
| 696 | Burdwan Division | Extension of pipeline from existing distribution system within the command area of Siali piped water supply scheme at Siali (Math Siali & Siali Habitation) village mouza under Jamalpur Block under Burdwan Division, PHE Dte. [Gr.-E] | ORD/000559/2021-2022 | 957/BSD | 23/07/2021 | 30 | ELECTRONIC SURVILLANCE | 3.22 | 0.00 | 1 | |||
| 697 | Burdwan Division | Repairing of concrete road damaged due to laying of pipeline within command area of MAHINDER PWSS under Burdwan Division PHE Dte. | ORD/000560/2023-2024 | 760/AE/HQ | 23/08/2023 | 30 | GHOSH CONSTRUCTION | 2.68 | 0.00 | 100 | |||
| 698 | Burdwan Division | Extension of pipeline at AMRA water supply scheme at different villages (Tengaberia, Badpur & Kolupukur) FHTC of Jamalpur Block under Burdwan Division, PHE Dte.[Gr.-F] | ORD/000561/2021-2022 | 1374/BSD | 05/10/2021 | 30 | D.M. ENTERPRISE | 4.74 | 0.00 | 1 | |||
| 699 | Burdwan Division | Emergency repaired cleaning of chokage AC Pipeline for (Retrofittins) for BAGILA Piped water supply scheme at Baharampur, Takipur & Kiskinda village for smooth drinking water supply (FHTC) within Memari-I Block under Burdwan Division, PHE Dte. Gr.A | ORD/000561/2022-2023 | 1918/BSD | 11/11/2022 | 15 | A R TRADERS | 0.93 | 0.00 | 1 | |||
| 700 | Burdwan Division | Continuation work order for water tap connection in each house hold from existing distribution system within scheme jurisdiction in Bhairabpur Habitation of Gopikantapur piped water supply scheme within Headquarters under Burdwan Division, PHE Dte. | ORD/000562/2021-2022 | 4818/BWD | 22/09/2021 | 30 | D.M. ENTERPRISE | 3.76 | 0.00 | 1 | |||
| 701 | Burdwan Division | Extension of uPVC pipeline for providing FHTC from existing distribution pipe line system within command area of MADHABPUR (Zone-II) W/S Scheme at Khalerpar under Gureghar village, Jamalpur Development Block under Burdwan Division, PHE Dte". Gr,B. | ORD/000562/2022-2023 | 2099/BSD | 28/11/2022 | 30 | PRATIMA CONSTRUCTION | 0.90 | 0.00 | 1 | |||
| 702 | Burdwan Division | Relaying and restoration of damaged pipeline of distribution main for construction of drain at Brajapur, Chonary and Asinda village to keep on FHTC within Kayrapur W/S Scheme (Part-B) in Ausgram-I Block under Burdwan Division, P.H.E. Dte. | ORD/000562/2023-2024 | 651/DSD | 24/08/2023 | 30 | TARAMA AGENCY | 0.95 | 0.00 | 100 | |||
| 703 | Burdwan Division | Continuation work order for Supply of 1 (one) No. Diesel driven Ambassador Car (Luxury Taxi) / Motor Cab on hire basis for the Office of the Assistant Engineer, under Katwa Sub-Division within Burdwan Division, P.H.E. Dte. [Period from 01.07.2024 to 31.12.2024]. | ORD/000562/2024-2025 | 788/KTS | 28/06/2024 | 183 | KRISHNA MONDAL | 2.40 | 0.00 | 80 | |||
| 704 | Burdwan Division | Providing functional household tap connection (FHTC) from existing distribution system within command area of DEBSHALA piped water supply scheme at Bagbati (02 Nos. habitation), Kakra, Satla (02 Nos. habitation), Gobindapur (03 Nos Habitation), Debshala (02 Nos. Habitation Part), Kankra (Part) & Paduma (02 Nos. habitation Part) village, Ausgram-II Block under Burdwan Division, PHE Dte. | ORD/000563/2020-2021 | 4998/BWD | 10/12/2020 | 90 | SAI TUBE CO. | 59.61 | 15.93 | 1 | |||
| 705 | Burdwan Division | Emergency repaired cleaning of chokage AC Pipeline for BARWA Piped Water Supply Scheme (Retrrofittings)at Mutra, senpur, Mohanpur & Barwa village distribution line smooth drinking (FHTC) water supply within Memari-II Block under Burdwan Division, PHE Dte. Gr.C | ORD/000563/2022-2023 | 1919/BSD | 11/11/2022 | 15 | A R TRADERS | 0.79 | 0.00 | 1 | |||
| 706 | Burdwan Division | Restoration of damaged pipeline of distribution main for construction of drain, concrete road etc at various point at Majhipara village for providing FHTC within Kashipur W/S Scheme in Bhatar Block under Burdwan Division, P.H.E. Dte. | ORD/000563/2023-2024 | 652/DSD | 24/08/2023 | 30 | ANWESHA CONSTRUCTION | 0.96 | 0.00 | 100 | |||
| 707 | Burdwan Division | Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of Bahirgannya piped water supply scheme at Bahirgannya (04 Nos. habitation Part), Askaran (02 Nos. habitation), Brindabanpur (02 Nos. Habitation), Kurkuba (03 Nos Habitation) & Srirampur (02 Nos. Habitation) village, Galsi-II Block under Burdwan Division, PHE Dte. | ORD/000564/2020-2021 | 5006/BWD | 10/12/2020 | 90 | SUPRIYA RAY | 99.82 | 34.58 | 1 | |||
| 708 | Burdwan Division | Emergency repair and provided (4 nos.100 dia S.V) No's Sluice Valve at Rasulpur Natun Rasta,Nichu Bazar of RASULPUR Piped Water Supply Scheme (Retrofittings) for smooth drinking water supply within within Memari-I Block under Burdwan Division, PHE Dte. Gr.D | ORD/000564/2022-2023 | 1920/BSD | 11/11/2022 | 15 | SUPRIYA RAY | 0.73 | 0.00 | 100 | |||
| 709 | Burdwan Division | Relaying and restoration of damaged pipeline of distribution main for widening of PWD road and Bridge at Sahebganj Bazar for providing FHTC within Kashipur W/S Scheme in Bhatar Block under Burdwan Division, P.H.E. Dte. | ORD/000564/2023-2024 | 653/DSD | 24/08/2023 | 30 | ANWESHA CONSTRUCTION | 0.95 | 0.00 | 100 | |||
| 710 | Burdwan Division | Extension of Pipeline for Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of TAKIPUR Piped Water Supply Scheme at Takipur (Part), Asinda (part) & Chanwari (Part) habitation, Ausgram-I Block within Durgapur (Burdwan North) Sub Division under Burdwan Division, P.H.E. Dte. [Sl-A] | ORD/000565/2021-2022 | 135/DSD | 02/03/2022 | 30 | HAMID SK | 4.78 | 0.00 | 1 | |||
| 711 | Burdwan Division | Extension of pipeline for providing FHTC at Pratappur CHITIM DANGA, RAMHARIPUR , MUSLIMPARA & DHANDAGHA of PRATAPPUR (ZONE-I) and its adjoining mouza's Piped W/S Scheme at Ausgram-II Block within Durgapur (Burdwan North)Sub Division under Burdwan Division, P.H.E. Dte. [Sl-E] | ORD/000566/2021-2022 | 134/DSD | 02/03/2022 | 30 | SAIKAT RAY | 4.64 | 0.00 | 1 | |||
| 712 | Burdwan Division | Sinking of 300 X 200mm dia Tube Well 150 mtr. Depth by D.R. Rig method using UPVC pipe (CM) and UPVC Medium Well Screen (RMS) of ANTPARA & its adjoining mouzas Piped Water Supply Scheme, [Nandanpur Vill.] Block ? Jamalpur, Dist - Purba Bardhaman under Burdwan Division, PHE Dte. _2ND CALL. | ORD/000566/2022-2023 | 5275/BWD | 30/11/2022 | 30 | SUSUNIA GP CO. OPERATIVE LABOUR CONTRACT AND CONSTRUCTION SOCIETY LTD. | 9.45 | 0.00 | 0 | |||
| 713 | Burdwan Division | Shifting and relaying of Distribution system and Rising main at OHR site of Orgram Piped W/S Scheme (Zone-II) at Bhatar Block under Durgapur Sub-Division, Burdwan Division, P.H.E. Dte. | ORD/000566/2023-2024 | 655/DSD | 24/08/2023 | 30 | INDIAN ENGINEERS CO.-OPERATIVE SOCIETY LTD. | 0.75 | 0.00 | 0 | |||
| 714 | Burdwan Division | Extension of pipeline for providing functional house hold tap connection at Antpara habitation within the command area of Antpara water supply scheme under Burdwan Division, PHE Dte. | ORD/000567/2020-2021 | 1258/AE/HQ | 15/02/2021 | 30 | WESTERN WATER SUPPLY AGENCY | 4.80 | 3.16 | 1 | |||
| 715 | Burdwan Division | Sinking of 300 X 200mm dia Tube Well 150 mtr. Depth by D.R. Rig method using UPVC pipe (CM) and UPVC Deep Well Screen (RMS) of RAIPUR & its adjoining mouzas Piped Water Supply Scheme, Block - Burdwan - II, Dist - Purba Bardhaman under Burdwan Division, PHE Dte. _2ND CALL. | ORD/000568/2022-2023 | 5273/BWD | 30/11/2022 | 30 | SUSUNIA GP CO. OPERATIVE LABOUR CONTRACT AND CONSTRUCTION SOCIETY LTD. | 9.45 | 0.00 | 1 | |||
| 716 | Burdwan Division | Laying of new 300 & 200 mm dia sluice valve with valve chamber and replacement of 200 & 150 mm dia sluice valve with valve chamber at Budbud bazar and near NH2 and sukdal within Durgapur Sub-Division under Burdwan Division, PHE Dte. | ORD/000568/2023-2024 | 657/DSD | 24/08/2023 | 15 | SOUMYAVASH DAS | 0.96 | 0.00 | 100 | |||
| 717 | Burdwan Division | Providing FHTC for 100% coverage at Nabagram, Basishta Pur, Keliri, Ajhapur & Dattapur Mouza (Village) for NABAGRAM Piped W/S Scheme, Jamalpur Dev. Block under Burdwan Division, PHE Dte. | ORD/000570/2023-2024 | 3716/BWD | 24/08/2023 | 30 | M/S UNIQUE | 23.77 | 0.00 | 50 | |||
| 718 | Burdwan Division | Extension of pipeline & providing Functional House Tap Connection at leftout portion of SHURA Zone-II W/S Scheme within Jamalpur Block under Burdwan Division, P.H.E Dte. | ORD/000571/2023-2024 | 764/AE/HQ | 25/08/2023 | 30 | SANDIPAN SENGUPTA | 3.93 | 0.00 | 100 | |||
| 719 | Burdwan Division | Providing FHTC for 100% coverage in different village (SUHARI, JARUL, ATTAGAR & GHATSHILA) from existing distribution system within SUHARI PWSS, Bardhhaman-II Development Block under Burdwan Division, PHE Dte._2ND CALL | ORD/000572/2023-2024 | 3722/BWD | 25/08/2023 | 30 | BIPLAB SAMANTA | 18.91 | 0.00 | 100 | |||
| 720 | Burdwan Division | Laying of inter connection between 3rd tube well site and distribution system for Raipur PWSS within Bardhaman-II Block, under Burdwan Division, PHE Dte. | ORD/000574/2023-2024 | 2039/BSD | 24/08/2023 | 45 | ISHAN CONSTRUCTION | 1.57 | 0.00 | 100 | |||
| 721 | Burdwan Division | Laying of dedicated HDPE pipeline for supply of sufficient water at Bhanjapur village of Lohai piped water supply scheme, Raina-II Block under Burdwan Division, PHE Dte. | ORD/000575/2021-2022 | 6741/BWD | 03/12/2021 | 30 | THREE MAA ENTERPRISE | 20.11 | 0.00 | 1 | |||
| 722 | Burdwan Division | Formal Work Order for Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of Rasulpur Piped Water Supply Scheme at Jitkanu, Genraghata, Paschim Tazpur, Ulara (2 Nos Habitation) & Baidyadanga Village (Mouza), Memari-I Block under Burdwan Division, PHE Dte.(Agreement No. 104/SE/CC/PHE/DTE of 2020-2021) | ORD/000578/2020-2021 | 996/BWD | 04/02/2021 | 60 | MITRA CONSTRUCTION | 93.49 | 94.11 | 0 | |||
| 723 | Burdwan Division | Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of AJHAPUR Piped Water Supply Scheme and its adjoining mouzas (Vill- Ajhapur, Habitation- Purba Sadipur, Musunda) at Jamalpur Block of Burdwan Sub-Division under Burdwan Division, PHE Dte. | ORD/000578/2021-2022 | 1352/BWD | 09/03/2022 | 45 | SUSUNIA GP CO. OPERATIVE LABOUR CONTRACT AND CONSTRUCTION SOCIETY LTD. | 41.37 | 0.00 | 1 | |||
| 724 | Burdwan Division | Emergency repair and provide 5 (5 nos 100 dia. S.V) No's Sluice Valve at Chaknara & Ullara village under Rasulpur piped water supply scheme (Retro Fittings) for smooth drinking water supply within Memari-I Block under Burdwan Division, PHE Dte (Part-B). | ORD/000578/2022-2023 | 1972/BSD | 16/11/2022 | 15 | SUPRIYA RAY | 0.90 | 0.00 | 0 | |||
| 725 | Burdwan Division | Shifting of 300 MM dia D.I. pipe and laying of 12 mtr 150 mm dia D.I.pipe for widening of NH2 at Budbud more and supply of 80 mm dia Sluice valve and construction of valve chamber of Mankar Water supply scheme within Galsi -I Block,under Durgapur Sub Division,PHE Dte. | ORD/000578/2023-2024 | 658/DSD | 24/08/2023 | 15 | SHANKHA GHOSH | 0.96 | 0.00 | 100 | |||
| 726 | Burdwan Division | Extension of pipeline of AJHAPUR Piped Water Supply scheme of Jamalpur Block under Burdwan Sub-Division,under Burdwan Division,PHE Dte. | ORD/000581/2022-2023 | 1978/BSD | 17/11/2022 | 15 | DEY NIRMAN | 0.51 | 0.00 | 1 | |||
| 727 | Burdwan Division | Emergent 56 Nos. Street Stand Post closed for FHTC Work under Gobindapur Piped Water Supply Scheme (Retro Fittings) under Burdwan Sub-Divn.within Burdwan Division, PHE Dte. | ORD/000582/2022-2023 | 1974/BSD | 16/11/2022 | 15 | A R TRADERS | 0.24 | 0.00 | 1 | |||
| 728 | Burdwan Division | Providing FHTC in each household from dist. System within Scheme jurisdiction in Hridaypur, Upalati, Belerhat, Gopalpur, Sultanpur, Isabpur & Naopara Village of SULTANPUR W/S. Scheme under Burdwan Division, PHE Dte. | ORD/000584/2021-2022 | 1357/BWD | 09/03/2022 | 30 | TAPAS KUMAR ROY | 16.69 | 0.00 | 1 | |||
| 729 | Burdwan Division | Providing FHTC - Sahajadpur (5 nos habitations)-170 nos & Bamunpara (7 nos habitation)-170 nos & Extension of pipeline to provide house connection at Tentulia village & Sahajadpur village for Drain out water of wash out & over flow line from existing OHR at Head Works Site of BAMUNPARA W/S Scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. | ORD/000588/2021-2022 | 1417/BWD | 10/03/2022 | 30 | M/S UNIQUE | 16.50 | 0.00 | 1 | |||
| 730 | Burdwan Division | Re-laying of UPVC (Damaged By WBSRDA Department) pipeline near RAMKRISHNAPUR MONDAL PARA under ANTPARA PWSS, Jamalpur Dev. Block under Burdwan Division, PHE Dte. | ORD/000588/2024-2025 | 740/AE/HQ | 13/09/2024 | 30 | J.K. CORPORATION | 0.96 | 0.00 | 100 | |||
| 731 | Burdwan Division | Providing Functional Household Tap Connection from existing distribution system within the command area of Kshetpur Palashi PWSS under Katwa Sub-Division under Burdwan Division PHE Dte. [Sl No-1] | ORD/000589/2021-2022 | 126/KTS | 21/02/2022 | 30 | SANTANU BHATTACHARYAY | 3.19 | 0.00 | 1 | |||
| 732 | Burdwan Division | Re-laying of UPVC (Damaged By WBSRDA Department) pipeline near RAMKRISHNAPUR MUSLIM PARA under ANTPARA PWSS, Jamalpur Dev. Block under Burdwan Division, PHE Dte. | ORD/000589/2024-2025 | 741/AE/HQ | 13/09/2024 | 30 | J.K. CORPORATION | 0.95 | 0.00 | 100 | |||
| 733 | Burdwan Division | Providing Functional Household Tap Connection at Gopalbera , Gotistha, dirghesoa habitation of Gopalbera , Gotistha, Kashiara village of Chanak and Gotistha G.P. from existing distribution system within the command area of Kashiara PWSS under Mongalkote Block under Katwa Sub-Division under Burdwan Division PHE Dte. (Sl No-01) | ORD/000590/2021-2022 | 127/KTS | 21/02/2022 | 30 | TAPAS KUMAR ROY | 4.83 | 0.00 | 1 | |||
| 734 | Burdwan Division | Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of UTTAR RADHAKANTAPUR Piped Water Supply Scheme at Uttar Radhakantapur, Patra, Katna etc village mouza, Memari-I Block under BURDWAN Division, P.H.E Dte. | ORD/000590/2023-2024 | 3763/BWD | 29/08/2023 | 760 | DEY NIRMAN | 13.95 | 0.00 | 100 | |||
| 735 | Burdwan Division | Re-laying of UPVC (Damaged By WBSRDA Department) pipeline near Dhapdhara Uttor Pal Para under SHURA Z-II PWSS, Jamalpur Dev. Block under Burdwan Division, PHE Dte. | ORD/000590/2024-2025 | 742/AE/HQ | 13/09/2024 | 30 | J.K. CORPORATION | 0.96 | 0.00 | 100 | |||
| 736 | Burdwan Division | Providing Functional Household Tap Connection at Jadabbati,Sukhpukuria and Pilsona habitation of Paschim Gopalpur, Sukhpukuria and Pilsona village of Gotistha G.P. from existing distribution system within the command area of Paschim Gopalpur PWSS under Mongalkote Block under Katwa Sub-Division under Burdwan Division PHE Dte. | ORD/000591/2021-2022 | 1439/BWD | 11/03/2022 | 30 | PARTHA PRATIM ACHARYA | 10.47 | 0.00 | 1 | |||
| 737 | Burdwan Division | Re-laying of UPVC (Damaged By WBSRDA Department) pipeline near Dhapdhara Bostom Para under SHURA Z-II PWSS, Jamalpur Dev. Block under Burdwan Division, PHE Dte. | ORD/000591/2024-2025 | 743/AE/HQ | 13/09/2024 | 30 | J.K. CORPORATION | 0.94 | 0.00 | 100 | |||
| 738 | Burdwan Division | Providing leftout water tap connection in different villages for 100% coverage to make it Sajal Gram from existing distribution system within scheme jurisdiction of different Piped Water Supply Schemes within Jamalpur Block (Jarogram, Ajhapur, Panchra & Jougram G.P.) under Burdwan Division, PHE. Dte. (Part-A)_2ND CALL. | ORD/000592/2021-2022 | 1454/BWD | 11/03/2022 | 30 | PREMANANDA ROY BISWAS | 18.83 | 0.00 | 1 | |||
| 739 | Burdwan Division | Re-laying of UPVC (Damaged By WBSRDA Department) pipeline near Dhapdhara Purba Pal Para under SHURA Z-II PWSS, Jamalpur Dev. Block under Burdwan Division, PHE Dte. | ORD/000592/2024-2025 | 744/AE/HQ | 13/09/2024 | 30 | J.K. CORPORATION | 0.96 | 0.00 | 100 | |||
| 740 | Burdwan Division | Construction of sanitary Latrine and water supply arrangement at Head Work Site of Majhigram Singot piped water supply schemes under Mongalkote Block under Katwa Sub-Division under Burdwan Division, PHE Dte.[Sl No-01] | ORD/000593/2021-2022 | 159/KTS | 24/02/2022 | 21 | BABUL SK | 1.76 | 0.00 | 1 | |||
| 741 | Burdwan Division | Road restoration work due to FHTC & extension pipeline for different village (Rayan, Naryandighi, Nari Das Para, Krishnapur, Nari & Sukantapally) under RAYAN Piped W/S. Scheme at Burdwan - I Dev. Block under Burdwan Division, PHE. Dte. | ORD/000593/2023-2024 | 3771/BWD | 29/08/2023 | 30 | DURGAPADA MONDAL | 5.97 | 0.00 | 100 | |||
| 742 | Burdwan Division | Surging of existing tube well at 1st , 2nd and 3rd Tube Well Site at Jaggeswardihi under Jaggeswardihi Piped Water Supply Scheme under Mongalkote Block under Katwa Sub-Division within Burdwan Division, P.H.E.Dte [Sl No-02] | ORD/000594/2021-2022 | 149/KTS | 23/02/2022 | 15 | PARTHA PRATIM ACHARYA | 1.03 | 0.00 | 1 | |||
| 743 | Burdwan Division | Connection of CWR & IEP with the existing distribution system under Natungram Piped Water Supply Scheme under Katwa Sub-Division under Burdwan Division, P.H.E. Dte. [Sl No-01] | ORD/000596/2021-2022 | 160/KTS | 24/02/2022 | 30 | JAHAR GHOSH | 1.50 | 0.00 | 1 | |||
| 744 | Burdwan Division | Formal Work Order for Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of Dwariapur Piped Water Supply Scheme at Gonna (1 No. Habitation), Alutia (Part), Dwariapur (7Nos Habitation) & Lakshmiganj (5 Nos Habitation) Village (Mouza), Ausgram-I Block under Burdwan Division, PHE Dte.[Agreement No. 109/2020-2021 OF SE/CC/PHE. DTE.] | ORD/000601/2020-2021 | 1600/BWD | 22/02/2021 | 60 | RANADHIR SINHA | 81.21 | 24.67 | 1 | |||
| 745 | Burdwan Division | Laying of 140 mm dia HDPE Pipeline from Sonarudra Head Work Site more to upto Shyambati & Baidyapur more (Sec 34-2-3-6-10-12-14-16-16A-16B) of SONARUDRA W/S Scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. | ORD/000601/2021-2022 | 1486/BWD | 14/03/2022 | 30 | HAMID SK | 18.85 | 0.00 | 100 | |||
| 746 | Burdwan Division | Continuation work order for Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Kenna village of Kenna piped water supply scheme within Burdwan Sub-Division under Burdwan Division, PHE Dte. | ORD/000604/2020-2021 | 1225/BWD | 11/02/2021 | 30 | BRINDABAN KONAR | 4.92 | 4.92 | 1 | |||
| 747 | Burdwan Division | Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Madanagar (Part) village (Madanagar Mejhpur Habitation) of Madanagar piped water supply scheme within Burdwan Sub-Division under Burdwan Division, PHE Dte. | ORD/000605/2020-2021 | 69/BWD | 05/01/2021 | 15 | PABITRA KUMAR SAMANTA | 4.86 | 4.05 | 1 | |||
| 748 | Burdwan Division | Extension of pipe line of Providing Functional Household Tap Connection (FHTC) from existing distribution system within command area of Agradwip Water Supply Schame under Agradwip PWSS at Babla danga and Saheb Nagar Habitation Katwa-II Block Katwa Sub-Division under Burdwan Division PHE Dte.. [Sl No-02] | ORD/000605/2021-2022 | 161/KTS | 24/02/2022 | 7 | SHUBHRA KANTI GHOSH | 2.10 | 0.00 | 1 | |||
| 749 | Burdwan Division | Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Banki village and Banki Habitation of Bamangaria piped water supply scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. [Phase-I] | ORD/000606/2020-2021 | 4123/BWD | 16/10/2020 | 30 | GOUTAM KUMAR MITRA | 4.86 | 4.52 | 1 | |||
| 750 | Burdwan Division | Extension of pipe line from the existing Distribution System within scheme jurisdiction at Jaggeswardihi village under Jaggeswardihi PWSS under Katwa Sub-Division under Burdwan Division PHE Dte.. [Sl No-03] | ORD/000606/2021-2022 | 170/KTS | 25/02/2022 | 7 | BABUL SK | 2.05 | 0.00 | 1 | |||
| 751 | Burdwan Division | Continuation work order for Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Dhanya Kherur village and Duleypara, Malpara, Mandalpara, Paschimpara & Purba Daspara Habitation of Majhergram piped water supply scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. [Phase-I] | ORD/000607/2020-2021 | 260/BWD | 13/01/2021 | 30 | SUBRATA GUPTA | 4.86 | 4.86 | 1 | |||
| 752 | Burdwan Division | Extension of pipe line at Kaichar Khane Para from the existing Distribution System within scheme jurisdiction under Jaggeswardihi PWSS under Mongalkote Block under Katwa Sub-Division under Burdwan Division PHE Dte. [Sl No-04] | ORD/000607/2021-2022 | 171/KTS | 25/02/2022 | 15 | BABUL SK | 4.64 | 0.00 | 1 | |||
| 753 | Burdwan Division | Extension of pipe line of Providing Functional Household Tap Connection (FHTC) from existing distribution system within command area of Agradwip Water Supply Schame under Agradwip PWSS at Gonsaishowra, & Sarawaridhowar Habitation Katwa-II Block Katwa Sub-Division under Burdwan Division PHE Dte.. [Sl No-05] | ORD/000608/2021-2022 | 172/KTS | 25/02/2022 | 7 | SHUBHRA KANTI GHOSH | 1.32 | 0.00 | 1 | |||
| 754 | Burdwan Division | Extension of pipe line at Kaichar Paschim Para from the existing Distribution System within scheme jurisdiction under Jaggeswardihi PWSS under Mongalkote Block under Katwa Sub-Division under Burdwan Division PHE Dte. [Sl No-06] | ORD/000609/2021-2022 | 173/KTS | 25/02/2022 | 15 | BABUL SK | 4.67 | 0.00 | 1 | |||
| 755 | Burdwan Division | Providing FHTC from dist. System within the command area of MAHESDANGA Piped Water Supply Scheme at Bahera (Part) and Mahesdanga (Part) Village (Mahesdanga, Aymadeulepara, Kamarpara & Jangalpara Habs.) at Memari-I Development Block under Burdwan Division, PHE Dte. | ORD/000611/2021-2022 | 1571/BWD | 16/03/2022 | 30 | SUPRIYA RAY | 22.42 | 0.00 | 1 | |||
| 756 | Burdwan Division | Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Jhaudanga village (Jhaudanga south habitation) of Jhaudanga piped water supply scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. [Phase-I](Tr No.-868/BWD/2020-21) | ORD/000612/2020-2021 | 597/BWD | 25/01/2021 | 15 | INVENT ENGINEERS CO. OPERATIVE SOCIETY LTD. | 4.86 | 4.86 | 1 | |||
| 757 | Burdwan Division | Providing FHTC from dist. System within the command area of RASULPUR Piped Water Supply Scheme at Genraghata, Paschim Tazpur, Ulara, Daluibazar of Daluibazar - I G.P. and different samsad such as Samsad No. 05, 13, 08, 12, 09, 10, 11, 15 & 14 within Nimo-I G.P. at Memari-I Development Block under Burdwan Division, PHE Dte. | ORD/000612/2021-2022 | 1572/BWD | 16/03/2022 | 60 | SUJAY KUMAR RAY | 55.17 | 0.00 | 1 | |||
| 758 | Burdwan Division | Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Sripur village (Sripur Habitation) of Kashipur piped water supply scheme within Durgapur Sub-Division under Burdwan Division, PHE Dte.(Tr No.-718/BWD/2020-21) | ORD/000613/2020-2021 | 1439/BWD | 18/02/2021 | 15 | ROY BISWAS CONSTRUCTION | 4.50 | 4.50 | 1 | |||
| 759 | Burdwan Division | Urgent repairing work at Sudpur piped water supply scheme to ensuring FHTC work under Katwa-I Block under Katwa Sub-Division, under Burdwan Division, PHE Dte.[Tr No.-875/BWD/20-21] | ORD/000614/2020-2021 | 91/KTS | 12/02/2021 | 3 | HAMID SK | 0.92 | 0.92 | 1 | |||
| 760 | Burdwan Division | Digital structurization of pipeline alignment and asset evaluation including holistic design, preparation of design and drawings of overall LDS for Bhatar Piped Water Supply Scheme Zone I & Zone II under Bhatar Block. | ORD/000617/2024-2025 | 3350/BWD | 11/09/2024 | 15 | HORIZEN | 5.23 | 0.00 | 100 | |||
| 761 | Burdwan Division | Restoration of damaged concrete road in connection with providing FHTC work at Laxmiganj, Gonna and Gopinathbati and Dwariapur village within Dwariapur Piped Water Supply Scheme at Ausgram-I Block within Durgapur Sub-Division under Burdwan Division, PHE Dte.[SL-B] | ORD/000621/2021-2022 | 163/DSD | 16/03/2022 | 15 | RANADHIR SINHA | 4.12 | 0.00 | 1 | |||
| 762 | Burdwan Division | Restoration of damaged pipeline of distribution main for construction of drain, concrete road etc. at various point at Jaykrishnapur, Taranagar and Pilgram village for providing FHTC within Jaykrishnapur W/S Scheme in Galsi-II Block under Burdwan Division, P.H.E. Dte.[SL-A] | ORD/000622/2021-2022 | 162/DSD | 16/03/2022 | 30 | SUDHAMAY MAJUMDAR | 4.81 | 0.00 | 1 | |||
| 763 | Burdwan Division | Laying of Interconnection of 4th Tube well site and Laying of 90 mm dia HDPE pipeline for KULINGRAM Piped Water Supply Scheme to provide house connection within Burdwan Sub-Division under Burdwan Division, PHE Dte. | ORD/000622/2023-2024 | 3917/BWD | 05/09/2023 | 30 | BARABELUN NO.-II G.P. UNEMPLOYED CO-OP LABOUR CONTRACT & CONSTRUCTION SOCIETY LTD. | 8.28 | 0.00 | 100 | |||
| 764 | Burdwan Division | Surging of existing Tube Well at Headwork site for Bolgona Water Supply Scheme , Block - Bhatar, Dist - Purba Barddhaman under Durgapur Sub Division, PHE Dte.[SL-C] | ORD/000623/2021-2022 | 164/DSD | 16/03/2022 | 5 | J. K. CORPORATION | 0.54 | 0.00 | 1 | |||
| 765 | Burdwan Division | Continuation work order for Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Arra village and Arrah habitation of Amarun piped water supply scheme within Durgapur (Bardhaman North) Sub-Division under Burdwan Division, PHE Dte. [Phase-I] | ORD/000624/2020-2021 | 4989/BWD | 10/12/2020 | 30 | M.R. CONSTRUCTION CO. | 4.86 | 4.86 | 1 | |||
| 766 | Burdwan Division | Restoration of damaged flanks during laying of distribution pipe with jhama metal and moorum of Bardhaman Katwa road from Shibpur towards 6th Mile ( From Node 89 -64) of Mahachanda Water Supply Scheme within Durgapur Sub Division Under Burdwan Division, PHE Dte.[SL-D] | ORD/000624/2021-2022 | 165/DSD | 16/03/2022 | 30 | PREMANANDA ROY BISWAS | 3.89 | 0.00 | 1 | |||
| 767 | Burdwan Division | Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Ekaihat & Bikaihat village of Ekaihat piped water supply scheme within Katwa Sub-Division under Burdwan Division, PHE Dte. | ORD/000625/2020-2021 | 364/KTS | 15/12/2020 | 7 | BISHWAJIT DAS | 1.18 | 1.18 | 1 | |||
| 768 | Burdwan Division | Relaying of pipe line damaged by construction of road with drain at Kankora and installation of Valves to regulate water supply at Bilashpur & Gobindapur of DEBSALA and its adjoining mouza's Piped W/S Scheme at Ausgram-II Block within Durgapur Sub Division under Burdwan Division, P.H.E. Dte.[SL-E] | ORD/000625/2021-2022 | 166/DSD | 16/03/2022 | 30 | BHARAT CONSTRUCTION | 2.53 | 0.00 | 1 | |||
| 769 | Burdwan Division | Relaying of UPVC pipe damaged due to construction of guard wall to maintain water supply at different location within command area of SURAH ZONE II PWSS Block Jamalpur under Burdwan Division P.H.E Dte. | ORD/000625/2022-2023 | 523/AE/HQ | 29/09/2022 | 30 | J. K. CORPORATION | 0.41 | 0.00 | 0 | |||
| 770 | Burdwan Division | Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Khetpur village of Khetpur Palashi piped water supply scheme within Katwa Sub-Division under Burdwan Division, PHE Dte. | ORD/000626/2020-2021 | 366/KTS | 15/12/2020 | 7 | TAPAS KUMAR ROY | 2.82 | 2.80 | 1 | |||
| 771 | Burdwan Division | Laying of HDPE pipeline at Shura, Chakdighi and Shukpur village for providing FHTC within Shura PWSS (Zone-I), Block-Jamalpur under Burdwan Division, PHE Dte._Gr-A | ORD/000626/2021-2022 | 124/AE/HQ | 04/03/2022 | 15 | BANGA NIRMAN | 4.71 | 0.00 | 1 | |||
| 772 | Burdwan Division | Supplying, laying, fitting, fixing of Sluice valve including construction of valve chamber within command area of SURAH ZONE I PWSS Block Jamalpur under Burdwan Division P.H.E Dte. | ORD/000626/2022-2023 | 524/AE/HQ | 29/09/2022 | 30 | D.M. ENTERPRISE | 0.41 | 0.00 | 100 | |||
| 773 | Burdwan Division | Shifting & Relaying of Damaged UPVC Pipeline at Chakdighi for Construction of Road under "PATHASHREE", SHURA ZONE-I PWSS, Jamalpur Dev. Block under Burdwan Division, PHE Dte. | ORD/000627/2024-2025 | 745/AE/HQ | 13/09/2024 | 30 | D.M. ENTERPRISE | 0.95 | 0.00 | 100 | |||
| 774 | Burdwan Division | Construction of different dia. Sluice Valve chamber to operate water flow for supplying water in zonal demand basis within command area of Antpara PWSS under Burdwan Division, PHE Dte._Gr-C | ORD/000628/2021-2022 | 125/AE/HQ | 04/03/2022 | 15 | SUPER SKILL | 4.81 | 0.00 | 1 | |||
| 775 | Burdwan Division | Shifting & Relaying of Damaged UPVC Pipeline at Chakdighi Baganbari for Construction of Road under "PATHASHREE", SHURA ZONE-I PWSS, Jamalpur Dev. Block under Burdwan Division, PHE Dte. | ORD/000628/2024-2025 | 746/AE/HQ | 13/09/2024 | 30 | D.M. ENTERPRISE | 0.72 | 0.00 | 100 | |||
| 776 | Burdwan Division | Interconnection between OHR & Delivery line at Head Works site under ITLA PWSS, Jamalpur Dev. Block under Burdwan Division, PHE Dte. | ORD/000629/2024-2025 | 747/AE/HQ | 13/09/2024 | 30 | DEBJYOTI GOSWAMI | 0.80 | 0.00 | 100 | |||
| 777 | Burdwan Division | Laying of uPVC pipe for providing FHTC at Faimpur, Parbatpur, Sahapur, Silatpur and Mahindar Village within Mahindar Piped Water Supply Scheme, Jamalpur Block under Burdwan Division P.H.E Dte._Gr. F | ORD/000631/2021-2022 | 128/AE/HQ | 04/03/2022 | 15 | M/S S. CHOUDHURY | 4.82 | 0.00 | 1 | |||
| 778 | Burdwan Division | Laying of uPVC pipe for providing FHTC at Gopikantapur, Ramchandrapur and Bishnubati Village within Gopikantapur Piped Water Supply Scheme, Jamalpur Block under Burdwan Division P.H.E Dte._Gr-G | ORD/000632/2021-2022 | 129/AE/HQ | 04/03/2022 | 15 | S.S. CONSTRUCTION | 3.71 | 0.00 | 1 | |||
| 779 | Burdwan Division | Extension of pipeline (Branch & Sub Branch) for Functional House Hold Tap Connection from existing distribution system within the command area of GOPIKANTAPUR Piped Water Supply Scheme, at Bhairabpur village, Jamalpur Block under Burdwan Division P.H.E Dte._Gr-H | ORD/000633/2021-2022 | 130/AE/HQ | 04/03/2022 | 15 | D.M. ENTERPRISE | 2.37 | 0.00 | 1 | |||
| 780 | Burdwan Division | Continuation work order for Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Balgona village and Balgona Habitation of Balgona piped water supply scheme within Durgapur (Bardhaman North) Sub-Division under Burdwan Division, PHE Dte. [Phase-I] | ORD/000635/2020-2021 | 4333/BWD | 05/11/2020 | 30 | S.S. CONSTRUCTION | 4.86 | 0.00 | 1 | |||
| 781 | Burdwan Division | Providing Functional Household Tap Connection(FHTC)from existing distribution system at Khetia Water Supply Scheme(Habitation-Khetia,Gopalbati,Tentral)of Burdwan-I Block under Burdwan Sub-Division under Burdwan Division,PHE Dte. | ORD/000635/2022-2023 | 11/BSD | 06/01/2023 | 15 | M/S UNIQUE | 0.92 | 0.00 | 0 | |||
| 782 | Burdwan Division | Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of Maheshdanga Piped Water Supply Scheme at Deule Village (4 Nos. habitations), Memari ¿ I Block under Burdwan Division, PHE Dte. | ORD/000638/2020-2021 | 1796/A/BWD | 26/02/2021 | 45 | INVENT ENGINEERS CO. OPERATIVE SOCIETY LTD. | 27.66 | 27.65 | 0 | |||
| 783 | Burdwan Division | Restoration of damaged flanks during laying of distribution pipe with jhama metal and moorum of Bardhaman Katwa road from Shibpur towards 6th Mile ( From Node 89 -64) of Mahachanda Water Supply Scheme within Durgapur Sub Division Under Burdwan Division, PHE Dte.[SL-D] | ORD/000638/2021-2022 | 165/DSD | 16/03/2022 | 30 | OM ENTERPRISE | 3.88 | 0.00 | 1 | |||
| 784 | Burdwan Division | Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of Majhergram Piped Water Supply Scheme at Sihigram (P) (Paschimpara habs.), Sonagachi (3 Nos. habs.), Majhergram (8 Nos. habs.) & Ganguria (3 Nos. habs), Monteswar Block under Burdwan Division, PHE Dte. | ORD/000639/2020-2021 | 1497/BWD | 18/02/2021 | 60 | INDIAN ENGINEERS CO.-OPERATIVE SOCIETY LTD. | 57.97 | 17.09 | 1 | |||
| 785 | Burdwan Division | Laying pipeline with FHTC for BALARAMPUR Water Supply Scheme at Matnasipur village (600 Nos) (from near rail gate to matnasipur) and rest portion FHTC work of Berugram village (46 Nos), Balarampur village (40 Nos), Nasipur village (45 Nos), Salimdanga village (15 Nos) within Jamalpur Block, under Burdwan Division, PHE Dte. | ORD/000639/2021-2022 | 1620/BWD | 21/03/2022 | 1217 | M/S ASHA CONSTRUCTION | 47.32 | 0.00 | 100 | |||
| 786 | Burdwan Division | Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of FAKIRPUR Piped Water Supply Scheme at Fakirpur & Bongpur village (Mouza), Burdwan - I Block under Burdwan Division, PHE Dte._2ND CALL. | ORD/000641/2020-2021 | 355/BWD | 15/01/2021 | 45 | AYSAN KHAN | 36.69 | 28.46 | 1 | |||
| 787 | Burdwan Division | Speacial repairing and replace damaged pipe line from Nabastha bus stand to saligram & chakundi village of Nabastha piped water supply scheme at Bardhhaman-II Block under Burdwan Div., PHE Dte.Gr.A. | ORD/000643/2021-2022 | 467/BSD | 21/03/2022 | 30 | SETH ENTERPRISE | 4.82 | 0.00 | 1 | |||
| 788 | Burdwan Division | Extension of pipeline for GHOSH Piped Water Supply Scheme at Mondaljona [6 No's], Kashirampur [8 No's],Total 14 No's FHTC Work for Sajal Gram (As per Field Verification Report for Har Ghar Jal Certification within Memari-I Block including leftout husehold water tap connection(FHTC) under Burdwan Division, PHE Dte. | ORD/000644/2022-2023 | 1350-A/BSD | 02/08/2022 | 5 | MAJILA ENTERPRISE | 0.97 | 0.00 | 0 | |||
| 789 | Burdwan Division | Extension of pipeline for NABAGRAM Piped Water Supply Scheme at Konarpara [24 No's]Total 24 No's FHTC Work for Sajal Gram (As per Resulation taken in Special Gram Sava on 01-08-2022 within Memari-I Block including leftout husehold water tap connection(FHTC) under Burdwan Division, PHE Dte. | ORD/000645/2022-2023 | 1351-A/BSD | 02/08/2022 | 5 | BHARAT CONSTRUCTION | 0.97 | 0.00 | 1 | |||
| 790 | Burdwan Division | Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of Sahahosenpur Piped Water Supply Scheme at Srikrishnapur Village, Rajarampur Village (2 Nos. habitations), Paikpara Village, Jotdakshin Village & Jotsriram Village, Jamalpur Block under Burdwan Division, PHE Dte. | ORD/000646/2020-2021 | 1690/BWD | 24/02/2021 | 60 | DIPAK ROY | 70.56 | 23.52 | 1 | |||
| 791 | Burdwan Division | Extension of pipeline for NABAGRAM Piped Water Supply Scheme at Kalupukur [2 No's], Kalanabagram[5 No's] Dadpur [8 No's], Paschim Memari [6 No's], Pingur [3 No's] Chuadanga [3 No's] Total 27 No's FHTC Work for Sajal Gram (As per Resulation taken in Special Gram Sava on 01-08-2022 within Memari-I Block including leftout household water tap connection (FHTC) under Burdwan Division, PHE Dte | ORD/000646/2022-2023 | 1352-A/BSD | 02/08/2022 | 5 | BHARAT CONSTRUCTION | 0.97 | 0.00 | 1 | |||
| 792 | Burdwan Division | Formal Work Order for Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of Barwa Piped Water Supply Scheme at Berwa (2 Nos Habitation Part), Mutra (2 Nos Habitation Part), Baneswarpur & Senpur (4 Nos Habitation) Village (Mouza), Memari-II Block under Burdwan Division, PHE Dte. | ORD/000647/2020-2021 | 916/BWD | 02/02/2021 | 90 | KALYAN CHOWDHURY | 45.14 | 0.00 | 1 | |||
| 793 | Burdwan Division | Construction of boundary wall (North side) including Front Gate at Pump house no - I Site of Maheshdanga Water Supply Scheme under Memari-I Dev. Block of Burdwan Division, PHE Dte. (Length -55.00 Mtr, Col-20 Nos). Gr.D. | ORD/000647/2021-2022 | 469/BSD | 21/03/2022 | 45 | SK ABDUL HALIM | 4.37 | 0.00 | 1 | |||
| 794 | Burdwan Division | Extension of pipeline for UTTAR RADHAKANTAPUR Piped Water Supply Scheme at Harirambati [7 No's], Kamalpur [4 No's], Kole [5 No's] Mallikapur [2 No's], Sahanagar [5 No's]Total 23 No's FHTC Work for Sajal Gram (As per Resulation taken in Special Gram Sava on 01-08-2022 within Memari-I Block including leftout household water tap connection (FHTC) under Burdwan Division, PHE Dte. | ORD/000647/2022-2023 | 1359-A/BSD | 03/08/2022 | 5 | D.M. ENTERPRISE | 0.96 | 0.00 | 1 | |||
| 795 | Burdwan Division | Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Kharashgram (Part) village (Kharashgram (Part) habitation) of Dirghapara Piped Water Supply Scheme within Kalna Sub-Divn. under Burdwan Division, PHE. Dte. (Part - A) [Sl. No. : ¿10¿] | ORD/000648/2020-2021 | 60/BWD | 05/01/2021 | 15 | HAFIJUR RAHAMAN MIDYA | 4.86 | 4.86 | 1 | |||
| 796 | Burdwan Division | Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Kharashgram (Part) village (Kharashgram (Part) habitation) of Dirghapara Piped Water Supply Scheme within Kalna Sub-Divn. under Burdwan Division, PHE. Dte. (Part - B) [Sl. No. : ¿11¿] | ORD/000649/2020-2021 | 61/BWD | 05/01/2021 | 15 | SK NUR ALAM | 4.86 | 4.86 | 1 | |||
| 797 | Burdwan Division | Construction of Boundary wall at 3RD Tubewell site Of Jaugram Water Supply scheme under JAMALPUR Block of Burdwan Division, PHE Dte. (LENGTH- 70.0M , COL- 28 NOS ) Gr.E | ORD/000649/2021-2022 | 470/BSD | 21/03/2022 | 45 | MUKHERJEE ENTERPRISE | 3.83 | 0.00 | 1 | |||
| 798 | Burdwan Division | Continuation work order for Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Madanagar village of Madanagar piped water supply scheme within Burdwan Sub-Division under Burdwan Division, PHE Dte. [Phase-I](Tr No.-716/BWD/2020-21) | ORD/000651/2020-2021 | 1224/BWD | 11/02/2021 | 30 | PABITRA KUMAR SAMANTA | 3.76 | 3.76 | 1 | |||
| 799 | Burdwan Division | Extension of pipeline for UTTAR RADHAKANTAPUR Piped Water Supply Scheme at Radhakantapur High School Kantagorer Par [23 Nos] Total 23 No's FHTC Work for Sajal Gram (As per Field Verification Report for Har Ghar Jal Certification within Memari-I Block including leftout household water tap connection (FHTC) under Burdwan Division, PHE Dte. | ORD/000651/2022-2023 | 1365-A/BSD | 04/08/2022 | 5 | D.M. ENTERPRISE | 0.97 | 0.00 | 1 | |||
| 800 | Burdwan Division | Extension of pipeline for UTTAR RADHAKANTAPUR Piped Water Supply Scheme at Radhakantapur Purbo Sansad Dule Para[23 No's] Total 23 No's FHTC Work for Sajal Gram (As per Field Verification Report for Har Ghar Jal Certification within Memari-I Block including leftout household water tap connection (FHTC) under Burdwan Division, PHE Dte. | ORD/000652/2022-2023 | 1366-A/BSD | 04/08/2022 | 5 | D.M. ENTERPRISE | 0.97 | 0.00 | 1 | |||
| 801 | Burdwan Division | FHTC for KAMARHATI (Zone-II] Water Supply Scheme at Kamarhati village (36 Nos) of Raina-II Block under Burdwan Division, PHE Dte. [for 100% FHTC at Kamarhati village (Harghar Jal)] | ORD/000653/2022-2023 | 1367-A/BSD | 04/08/2022 | 5 | ANWESHA CONSTRUCTION | 0.98 | 0.00 | 1 | |||
| 802 | Burdwan Division | Providing FHTC in Nandra & Naopara village for 100% coverage in Sajal Gram from existing distribution system within Nandra PWSS, Bardhhaman-II Development Block under Burdwan Division, PHE Dte. | ORD/000654/2022-2023 | 1360-A/BSD | 03/08/2022 | 5 | BHARAT CONSTRUCTION | 0.97 | 0.00 | 1 | |||
| 803 | Burdwan Division | Continuation work for Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Sihigram village and Adibasipara, Hindupara (Sihigram), Kamarpara & Makarpara habitation of Majhergram Piped Water Supply Scheme within Kalna Sub-Divn. under Burdwan Division, PHE. Dte. [Phase - I] [GROUP : ¿11B¿] | ORD/000658/2021-2022 | 1667/BWD | 23/03/2022 | 30 | N.S. ENTERPRISE | 4.16 | 0.00 | 1 | |||
| 804 | Burdwan Division | Continuation work order for Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Nurpur village and Nurpur Habitation of KASHIPUR piped water supply scheme within Durgapur Sub-Division (Bardhaman North) under Burdwan Division, PHE Dte. [Phase-I] | ORD/000659/2020-2021 | 3971/BWD | 14/10/2020 | 30 | THREE MAA ENTERPRISE | 1.21 | 1.21 | 1 | |||
| 805 | Burdwan Division | Construction of boundary wall (Back side of OHR) including land development & Pumping out of water at Pump house no - 1 Site of Nabagram Water Supply Scheme under Jamalpur Dev. Block of Burdwan Division, PHE Dte. (Length -50.00 Mtr, Col-20 Nos). Gr.G. | ORD/000659/2021-2022 | 472/BSD | 21/03/2022 | 45 | MOHAMMAD ISSA | 3.77 | 0.00 | 1 | |||
| 806 | Burdwan Division | Laying of uPVC pipe for providing FHTC at Dakshinmohanpur habitation within ANTPARA Piped Water Supply Scheme, Jamalpur Block under Burdwan Division P.H.E Dte._Gr-C | ORD/000664/2021-2022 | 145/AE/HQ | 16/03/2022 | 20 | MUKHERJEE ENTERPRISE | 4.75 | 0.00 | 1 | |||
| 807 | Burdwan Division | Laying of HDPE pipeline at Dhapdhara village for providing FHTC within SHURA PWSS (Zone-II), Block-Jamalpur under Burdwan Division, PHE Dte._Gr-A | ORD/000665/2021-2022 | 133/AE/HQ | 11/03/2022 | 20 | M/S UNIT CONSTRUCTION | 2.79 | 0.00 | 1 | |||
| 808 | Burdwan Division | Repairing and restoration of damaged and chokaged various dia UPVC pipeline and Construction of Valve chambers to control flow of water for providing FHTC in ITLA Piped W/S. Scheme at Jamalpur Dev Block under Burdwan Division ,P.H.E Dte._Gr-I | ORD/000667/2021-2022 | 147/AE/HQ | 16/03/2022 | 20 | BHARAT CONSTRUCTION | 4.55 | 0.00 | 1 | |||
| 809 | Burdwan Division | Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of JOTRAGHAB Piped Water Supply Scheme at (JOTRAGHAB, RADHABALLAB BATI, KHANPUR, JOTKRISHTAI) Mouza under Jamalpur Block of Burdwan Sub-Division under Burdwan Division, PHE Dte. | ORD/000667/2022-2023 | 382/BWD | 31/01/2023 | 30 | KAUSHIK RAY | 21.55 | 0.00 | 100 | |||
| 810 | Burdwan Division | Laying of uPVC pipe for providing FHTC at Madhabdihi, Lohai and Akhina Village within LOHAI Piped Water Supply Scheme, Raina-II Block under Burdwan Division P.H.E Dte._Gr-E | ORD/000668/2021-2022 | 137/AE/HQ | 15/03/2022 | 20 | M/S S. CHOUDHURY | 4.80 | 0.00 | 1 | |||
| 811 | Burdwan Division | Sinking of 300 X 200mm dia Tube Well 200 mtr. Depth by D.R. Rig method using UPVC pipe (CM) and UPVC Medium Well Screen (RMS) for Augmentation of PANUHAT and its adjoining mouzas Piped Water Supply Scheme, Block Katwa I, Dist - Purba Bardhaman under Burdwan Division, PHE Dte. | ORD/000668/2022-2023 | 387/BWD | 31/01/2023 | 30 | SUBODH KUMAR MONDAL | 11.70 | 0.00 | 100 | |||
| 812 | Burdwan Division | Extension of pipeline for BAGILA Water Supply Scheme at (Baharampur, Taktipur, Krishnapur & Kiskinda North East) village within Memari I Block, under Burdwan Division, PHE Dte. | ORD/000669/2021-2022 | 1708/BWD | 25/03/2022 | 30 | A R TRADERS | 27.27 | 0.00 | 1 | |||
| 813 | Burdwan Division | Sinking of 300 X 200mm dia Tube Well 200 mtr. Depth by D.R. Rig method using UPVC pipe (CM) and UPVC Medium Well Screen (RMS) for Augmentation of SRIKHANDA and its adjoining mouzas Piped Water Supply Scheme, Block Katwa I, Dist - Purba Bardhaman under Burdwan Division, PHE Dte. | ORD/000669/2022-2023 | 388/BWD | 31/01/2023 | 30 | SUBODH KUMAR MONDAL | 11.81 | 0.00 | 100 | |||
| 814 | Burdwan Division | Providing FHTC from the existing distribution line and special repair of existing different dia UPVC pipeline including supply of Sluice Valve for proper functioning the existing line of Sonarudra W/S Scheme of Purbasthali-I block within Kalna Sub-Division under Burdwan Division, PHE Dte. | ORD/000672/2021-2022 | 29/KSD | 07/01/2022 | 30 | BABUL SK | 4.14 | 0.00 | 1 | |||
| 815 | Burdwan Division | Providing leftout water tap connection in different villages for 100% coverage to make it Sajal Gram from existing distribution system within scheme jurisdiction of different Piped Water Supply Schemes within Galsi ¿ I Block under Burdwan Division, PHE. Dte._2ND CALL. | ORD/000673/2021-2022 | 1738/BWD | 28/03/2022 | 1101 | JYOTI ENTERPRISE | 5.72 | 0.00 | 100 | |||
| 816 | Burdwan Division | Continuation work order for Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Palla (Pt-B) village of Palla Piped Water Supply Scheme within Burdwan Sub-Divn. under Burdwan Division, PHE. Dte. [Phase - I] [GROUP : ¿11B¿] | ORD/000674/2020-2021 | 4912/BWD | 08/12/2020 | 30 | S.C. ENTERPRISE | 4.92 | 4.88 | 1 | |||
| 817 | Burdwan Division | Extension of pipeline for KAMARHATI Water Supply Scheme FOR FHTC work at GOTAN village within Raina II Block, under Burdwan Division, PHE Dte. Gr.A. | ORD/000674/2021-2022 | 534/BSD | 28/03/2022 | 30 | KOUSIK MALLICK | 4.96 | 0.00 | 1 | |||
| 818 | Burdwan Division | Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of Shura (Zone-I) Piped Water Supply Scheme at Shura Village (3 Nos. habitations), Chakdihi Village & Shukpur Village, Jamalpur Block under Burdwan Division, PHE Dte. | ORD/000675/2020-2021 | 1763/BWD | 26/02/2021 | 60 | SUKALPA NIRMAN | 83.40 | 26.66 | 1 | |||
| 819 | Burdwan Division | Continuation work order for water tap connection in each house hold from existing distribution system within scheme jurisdiction in Purba Krishnapur village of Suhari piped water supply scheme within Burdwan Sub-Division under Burdwan Division, PHE Dte.[Phase-I] | ORD/000677/2020-2021 | 1326/BWD | 12/02/2021 | 30 | SAMANTA CONSTRUCTION | 4.92 | 0.00 | 1 | |||
| 820 | Burdwan Division | Providing Functional Household tap connection (FHTC) from existing distribution system within the command area of PALASON piped water supply scheme at Raina-I Block under Burdwan Division, PHE Dte._2nd call. | ORD/000678/2020-2021 | 1409/BWD | 18/02/2021 | 60 | S.S. ENTERPRISE | 72.41 | 19.30 | 1 | |||
| 821 | Burdwan Division | Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Basatpur village of Raipur Piped Water Supply Scheme within Burdwan Sub-Divn. under Burdwan Division, PHE. Dte. [Phase - I] [GROUP : ¿1A¿] | ORD/000679/2020-2021 | 2726/BWD | 10/08/2020 | 30 | ASHOK KUMAR GHOSH | 4.92 | 0.00 | 1 | |||
| 822 | Burdwan Division | Providing Functional Household tap connection from existing distribution system within the command area of Augmentation of Purbasthali piped water supply scheme at Palaspuli village (Mouza), Purbasthali-II Block under Burdwan Division, PHE Dte. | ORD/000680/2020-2021 | 993./BWD | 04/02/2021 | 45 | IJABUL SEKH | 51.07 | 0.00 | 1 | |||
| 823 | Burdwan Division | Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of Augmentation of Purbasthali Piped Water Supply Scheme at Chupi Village (Mouza), Purbasthali-II Block under Burdwan Division, PHE Dte._2ND CALL | ORD/000681/2020-2021 | 1589/BWD | 22/02/2021 | 45 | DHIRENDRA ENGINEERING & CONSTRUCTION | 70.28 | 17.82 | 1 | |||
| 824 | Burdwan Division | Extension of UPVC distribution pipeline in connection with FHTC for Hatgobindapur and its adjoining mouzas water supply scheme at Bardhaman-II Development Block under Burdwan Division, PHE Dte.[Gr-A] | ORD/000688/2021-2022 | 989/BSD | 30/07/2021 | 30 | M/S ASHA CONSTRUCTION | 4.82 | 0.00 | 1 | |||
| 825 | Burdwan Division | Continuation work order for Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Tehata (Part) village Tehata (Part) habitation of Tehata piped water supply scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. [SL NO.-05] | ORD/000689/2020-2021 | 1223/BWD | 11/02/2021 | 15 | ROY & ROY CONSTRUCTION | 3.16 | 3.16 | 1 | |||
| 826 | Burdwan Division | Work order for "Providing Functional house hold tap connections for Sajal Gram Village within Kalna-I Block under Kalna Sub-Division under Burdwan Division, PHE Dte. (Dharmadanga Water Supply Scheme) Sl No- 5 | ORD/000689/2022-2023 | 101/KSD | 08/02/2023 | 28 | BUILD-TECH | 0.88 | 0.00 | 100 | |||
| 827 | Burdwan Division | Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Tehata (Part) village, Tehata (Part) habitation of Tehata piped water supply scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. [SL NO.-05] | ORD/000690/2020-2021 | 55/BWD | 05/01/2021 | 15 | ROY & ROY CONSTRUCTION | 4.86 | 4.86 | 1 | |||
| 828 | Burdwan Division | Work order for " Providing Functional house hold tap connections for Sajal Gram Village within Purbasthali-I Block under Kalna Sub-Division under Burdwan Division, PHE Dte. (Nadanghat & others scheme) Sl No-7" | ORD/000690/2022-2023 | 103/KSD | 08/02/2023 | 28 | MOMINUL ISLAM MONDAL | 0.88 | 0.00 | 0 | |||
| 829 | Burdwan Division | Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Kalyanpur (Part) village, Kalyan (Part) habitation of Kalyanpur piped water supply scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. (Part-A)[SL NO.-07] | ORD/000691/2020-2021 | 57/BWD | 05/01/2021 | 15 | SETH ENTERPRISE | 4.86 | 4.86 | 1 | |||
| 830 | Burdwan Division | Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Bajitpur village, Bajit habitation & Jhikra village (Jhikra habitation) of Tehata piped water supply scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. [SL NO.-02] | ORD/000692/2020-2021 | 52/BWD | 05/01/2021 | 15 | YOUNG ENGINEERS CO.-OPERATIVE SOCIETY LTD. | 4.86 | 4.86 | 1 | |||
| 831 | Burdwan Division | Continuation order for supply & delivery of different dia CIDF pipes, sluice valve & fittings for construction of RCC OHR (450 cum capacity) for Hiranyagram w/s scheme under Burdwan Division, PHE Dte. | ORD/000692/2021-2022 | 388/BWD | 20/01/2022 | 20 | ASHOKE ENGINEERING WORKS | 15.17 | 0.00 | 1 | |||
| 832 | Burdwan Division | Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Tehata (Part) village (Bajitpur & Sarpukur habitation) of Tehata piped water supply scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. [SL NO.-06] | ORD/000693/2020-2021 | 56/BWD | 05/01/2021 | 15 | M/S UNIQUE | 4.86 | 4.86 | 1 | |||
| 833 | Burdwan Division | Continuation order for supply & delivery of different dia CIDF pipes, sluice valve & fittings for construction of RCC OHR (400 cum capacity) for Chakshanjadi w/s scheme under Burdwan Division, PHE Dte. | ORD/000693/2021-2022 | 387/BWD | 20/01/2022 | 20 | B.B.C. ENTERPRISE | 15.17 | 0.00 | 1 | |||
| 834 | Burdwan Division | Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Reshalatpur village and Reshalatpur habitation of SIALI piped water supply scheme within Burdwan Sub-Division, under Burdwan Division, PHE Dte.[Phase-I] | ORD/000694/2020-2021 | 3321/BWD | 18/09/2020 | 30 | MUKHERJEE ENTERPRISE | 4.84 | 4.66 | 1 | |||
| 835 | Burdwan Division | Continuation work order for Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Haripur village and Haripur habitation of Balgona piped water supply scheme within Durgapur (Bardhaman North) Sub-Division under Burdwan Division, PHE Dte. [Phase-I] | ORD/000697/2020-2021 | 4334/BWD | 05/11/2020 | 30 | S.S. CONSTRUCTION | 4.03 | 4.01 | 1 | |||
| 836 | Burdwan Division | Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Balgona village and Balgona habitation of Balgona piped water supply scheme within Durgapur (Bardhaman North) Sub-Division under Burdwan Division, PHE Dte. [Phase-I] | ORD/000698/2020-2021 | 3347/BWD | 18/09/2020 | 30 | S.S. CONSTRUCTION | 4.86 | 4.75 | 1 | |||
| 837 | Burdwan Division | Relaying of distribution main in alternate route for improvement of water supply at Basudha (South Panoa) village within Serua water supply scheme in Bhatar Block under Burdwan Division, PHE Dte. | ORD/000698/2021-2022 | 6119/BWD | 25/10/2021 | 30 | KOUSIK MALLICK | 26.54 | 0.00 | 1 | |||
| 838 | Burdwan Division | Continuation work order for Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Chaktentul village and Chaktentul habitation of Chaktentul piped water supply scheme within Durgapur Sub-Division under Burdwan Division, PHE Dte. [Phase-I] | ORD/000700/2020-2021 | 4455/BWD | 10/11/2020 | 30 | SAIKAT RAY | 4.92 | 4.92 | 1 | |||
| 839 | Burdwan Division | Laying of interconnection of the Pump No.-3 with distribution line 100 mm dia for Hatgobindapur piped water supply scheme of Burdwan-II Block under Burdwan Division, PHE Dte.[Gr.-B] | ORD/000702/2021-2022 | 1027/BSD | 05/08/2021 | 30 | ANWESHA CONSTRUCTION | 1.67 | 0.00 | 1 | |||
| 840 | Burdwan Division | Sinking of 250 X 150mm dia Tube Well 150 mtr. Depth by D.R. Rig method using UPVC pipe (CM) and UPVC Medium Well Screen (RMS) for 2nd TW Site of MANIKHAR & its adjoining mouzas Piped Water Supply Scheme, Block Kalna I, Dist - Purba Bardhaman under Burdwan Division, PHE Dte. | ORD/000704/2022-2023 | 658/BWD | 21/02/2023 | 30 | DAS CONSTRUCTION | 8.72 | 0.00 | 1 | |||
| 841 | Burdwan Division | Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Kharashgram (Part) village , Kharashgram (Part) habitation of Dirghapara piped water supply scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. [Part-C][SL NO.-12] | ORD/000705/2020-2021 | 62/BWD | 05/01/2021 | 15 | INVENT ENGINEERS CO. OPERATIVE SOCIETY LTD. | 4.84 | 4.84 | 1 | |||
| 842 | Burdwan Division | Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of GANGATIKURI Piped Water Supply Scheme at Ketugram-II Block under Burdwan Division, PHE Dte. | ORD/000706/2020-2021 | 1007/BWD | 05/02/2021 | 90 | M/S ASOKE GHOSH & BROTHERS | 47.52 | 0.00 | 1 | |||
| 843 | Burdwan Division | Providing Functional House Hold Tap connection (FHTC) from existing distribution system within the command area of MANKAR piped water supply scheme at Budbud (Part) village Budbud (Part) habitation (Mouza), Galsi-I Block under Burdwan Division, PHE Dte. | ORD/000707/2020-2021 | 547/BWD | 22/01/2021 | 30 | SAIKAT RAY | 22.24 | 22.23 | 1 | |||
| 844 | Burdwan Division | Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Baitipara village (Baitipara Habitation) of Tehata piped water supply scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. [Sl No.-01] | ORD/000709/2020-2021 | 51/BWD | 05/01/2021 | 15 | SUKANTA DEY | 4.87 | 4.87 | 1 | |||
| 845 | Burdwan Division | Laying of additional UPVC pipeline for interconnection with main line to branch line of SRIRAMPUR Water Supply Scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. | ORD/000710/2023-2024 | 4522/BWD | 12/10/2023 | 30 | JAMALUDDIN SK | 6.16 | 0.00 | 100 | |||
| 846 | Burdwan Division | Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Paschim Gopalpur (Part) village (Jadabbati, Mirapur & Paschim Gopalpur (Part) habitation) & Radhanagar village (Radhanagar habitation) of Paschim Gopalpur Piped Water Supply Scheme within Katwa Sub-Divn. under Burdwan Division, PHE. Dte. [Sl. No. : ¿14¿] | ORD/000711/2020-2021 | 64/BWD | 05/01/2021 | 15 | ASMA ENTERPRISE | 4.86 | 0.00 | 1 | |||
| 847 | Burdwan Division | Extension of pipeline of Anguna water supply scheme at Anguna, Sanktia and Gunar village within Raina-I Block under Burdwan division, PHE Dte.[Gr.-A] | ORD/000711/2021-2022 | 1480/BSD | 09/11/2021 | 30 | SK ABDUL HALIM | 4.44 | 0.00 | 1 | |||
| 848 | Burdwan Division | Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Kutubpur (Part) village (Habibpur Habitation) of Tehata piped water supply scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. [SL NO.-03] | ORD/000713/2020-2021 | 53/BWD | 05/01/2021 | 15 | TAPAS KUMAR ROY | 4.86 | 4.86 | 0 | |||
| 849 | Burdwan Division | Continuation work order for Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Nandra village of Nandra piped water supply scheme within Burdwan Sub-Division under Burdwan Division, PHE Dte. [Phase-I] | ORD/000714/2020-2021 | 4087/BWD | 16/10/2020 | 30 | BHARAT CONSTRUCTION | 2.00 | 2.00 | 1 | |||
| 850 | Burdwan Division | Sinking of 150mm. dia. 100 Mtr. Deep tube well & Laying Distribution pipeline including FHTC under Jal Swapna Scheme for SWASTI PALLY Mini Piped W/S. Scheme within NABAGRAM Piped W/S. Scheme under Burdwan Division, PHE. Dte. | ORD/000714/2022-2023 | 890/BWD | 01/03/2023 | 45 | BAMDEB CONSTRUCTION & CO | 30.68 | 0.00 | 100 | |||
| 851 | Burdwan Division | Extension of pipeline for Anguna water supply scheme at Anguna, Sanktia and Gunar village within Raina-I Block under Burdwan Division, PHE Dte.[Gr.-B] | ORD/000715/2021-2022 | 1429/BSD | 28/10/2021 | 30 | SK ABDUL HALIM | 4.38 | 0.00 | 1 | |||
| 852 | Burdwan Division | Bypass arrangement of rising main and providing Functional house hold tap connections at Srirampur GP within Purbasthali-I Block under SRIRAMPUR PWSS under Burdwan Division, PHE Dte. | ORD/000715/2022-2023 | 889/BWD | 01/03/2023 | 30 | JAMALUDDIN SK | 13.01 | 0.00 | 0 | |||
| 853 | Burdwan Division | Continuation work order for water tap connection in each house hold from existing distribution system within scheme jurisdiction in Reshalatpur village and Reslatpur habitation of Siali piped water supply scheme under Burdwan Division, PHE Dte.[Phase-I] | ORD/000718/2021-2022 | 7089/BWD | 22/12/2021 | 30 | MUKHERJEE ENTERPRISE | 3.45 | 0.00 | 1 | |||
| 854 | Burdwan Division | Sinking of Tube Well, Construction of Pump House, Boundary wall & interconnection work of Kasa village of PUTSURI Water Supply Scheme within Kalna Sub-Division under Burdwan division, PHE Dte. | ORD/000721/2023-2024 | 4532/BWD | 13/10/2023 | 60 | B.S. ENTERPRISE | 27.32 | 0.00 | 40 | |||
| 855 | Burdwan Division | Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Kutubpur (Part) village (Kutub Habitation) & Suipara village (Suipara Habitation) of Tehata piped water supply scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. [Sl No.-04] | ORD/000723/2020-2021 | 54/BWD | 05/01/2021 | 15 | INVENT ENGINEERS CO. OPERATIVE SOCIETY LTD. | 4.84 | 4.84 | 1 | |||
| 856 | Burdwan Division | Extension of pipeline for SHURA (Zone-II) Piped W/S. Scheme Total 129 Nos. FHTC work for Sajal Gram (As per Field Verification Report for Har Ghar Jal Certification within Jamalpur Block including leftout household water tap connection (FHTC) under Burdwan Division, PHE Dte. | ORD/000723/2022-2023 | 970/BWD | 03/03/2023 | 30 | SANDIPAN SENGUPTA | 4.08 | 0.00 | 1 | |||
| 857 | Burdwan Division | Designing, Making and Erection of Sign Board for SAJAL GRAM in Kayrapur Village, Ausgram-I Block within Kayrapur PWSS under Burdwan Division, PHE Dte. (5 Nos Board) | ORD/000730/2023-2024 | 823/AE/HQ | 30/10/2023 | 30 | ISHAN CONSTRUCTION | 0.76 | 0.00 | 0 | |||
| 858 | Burdwan Division | Construction of sluice valve chamber (80 mm dia S/V) of Khetpur Palashi piped water supply scheme under Katwa Sub-Division under Burdwan Division, PHE Dte.[Sl No.-01] | ORD/000731/2020-2021 | 14/KTS | 08/01/2021 | 3 | CHANCHAL PAL | 0.41 | 0.41 | 1 | |||
| 859 | Burdwan Division | Continuation order for water tap connection in each house hold from existing distribution system within scheme jurisdiction in Rameswarpur village and Rameswarpur habitation of Dharmadanga piped water supply scheme within Kalna Sub-Division under Burdwan Division, PHE Dte.[Phase-I][Group-1B] | ORD/000732/2020-2021 | 4743/BWD | 01/12/2020 | 30 | TAPAS KUMAR ROY | 3.20 | 3.20 | 1 | |||
| 860 | Burdwan Division | Designing, Making and Erection of Sign Board for SAJAL GRAM in Gopalbati Village, Burdwan - I Block within Khetia PWSS under Burdwan Division, PHE Dte. (5 Nos Board) | ORD/000732/2023-2024 | 825/AE/HQ | 30/10/2023 | 30 | ISHAN CONSTRUCTION | 0.76 | 0.00 | 100 | |||
| 861 | Burdwan Division | Designing, Making and Erection of Sign Board for SAJAL GRAM in Tentral Village, Burdwan - I Block within Khetia PWSS under Burdwan Division, PHE Dte. (5 Nos Board) | ORD/000733/2023-2024 | 826/AE/HQ | 30/10/2023 | 30 | ISHAN CONSTRUCTION | 0.76 | 0.00 | 100 | |||
| 862 | Burdwan Division | Designing, Making and Erection of Sign Board for SAJAL GRAM in Kuli Village, Monteswar Block within Susunia PWSS under Burdwan Division, PHE Dte. (5 Nos Board) | ORD/000734/2023-2024 | 827/AE/HQ | 30/10/2023 | 30 | ISHAN CONSTRUCTION | 0.76 | 0.00 | 100 | |||
| 863 | Burdwan Division | Designing, Making and Erection of Sign Board for SAJAL GRAM in Budhpur Village, Monteswar Block within Susunia PWSS under Burdwan Division, PHE Dte. (5 Nos Board) | ORD/000735/2023-2024 | 828/AE/HQ | 30/10/2023 | 30 | ISHAN CONSTRUCTION | 0.76 | 0.00 | 100 | |||
| 864 | Burdwan Division | Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Purba Sahapur (Pt-B) village of Purba Sahapur Piped Water Supply Scheme within Kalna Sub-Divn. under Burdwan Division, PHE. Dte. [Phase - I] [Sl.No : 7B] | ORD/000738/2020-2021 | 2587/BWD | 04/08/2020 | 30 | SETH ENTERPRISE | 4.92 | 0.00 | 1 | |||
| 865 | Burdwan Division | Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Jajanpur village and Jajanpur-Tangaberia habitation of JAUGRAM piped water supply scheme within Burdwan Sub-Division under Burdwan Division, PHE Dte.[Phase-I][Gr.-6B] | ORD/000740/2020-2021 | 3331/BWD | 18/09/2020 | 30 | DEY NIRMAN | 4.86 | 4.86 | 0 | |||
| 866 | Burdwan Division | Designing, Making and Erection of Sign Board for SAJAL GRAM in Rameswarpur (P) Village, Kalna - I Block within Dharma Danga PWSS under Burdwan Division, PHE Dte. (5 Nos Board) | ORD/000741/2023-2024 | 836/AE/HQ | 31/10/2023 | 30 | MUNSHI JAVEDUR JAMAN | 0.76 | 0.00 | 100 | |||
| 867 | Burdwan Division | Supply & delivery of different dia. CIDF Pipes, Sluice valve & fittings for construction of RCC OHR (350 cum capacity) for SHURA (ZONE-I) W/S. Scheme under Burdwan Division, P.H.E. Dte. [Group: B] | ORD/000742/2021-2022 | 165/AE/HQ | 24/03/2022 | 10 | BENGAL BUILDERS | 3.08 | 0.00 | 1 | |||
| 868 | Burdwan Division | Designing, Making and Erection of Sign Board for SAJAL GRAM in Purba Shrirampur Village, Memari - II Block within Uttar Radhakantapur PWSS under Burdwan Division, PHE Dte. (5 Nos Board) | ORD/000742/2023-2024 | 837/AE/HQ | 31/10/2023 | 30 | MUNSHI JAVEDUR JAMAN | 0.76 | 0.00 | 100 | |||
| 869 | Burdwan Division | Additional Extension of UPVC distribution pipeline in connection with FHTC for NANDRA & adjoining mouzas water supply scheme at Bardhaman-I Block under Burdwan division, PHE Dte.[Gr.-C] | ORD/000743/2020-2021 | 73/BSD | 19/01/2021 | 30 | BHARAT CONSTRUCTION | 4.22 | 4.18 | 1 | |||
| 870 | Burdwan Division | Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Kalyanpur (Part) village (Kalyanpur Part habitation) of Kalyanpur piped water supply scheme within Kalna Sub-Division under Burdwan Division, PHE Dte.(Part-B)[SL NO.-08] | ORD/000744/2020-2021 | 58/BWD | 05/01/2021 | 15 | BISHWAJIT DAS | 4.86 | 4.86 | 1 | |||
| 871 | Burdwan Division | Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Bagila village (Bagila Habitation) of Bagila piped water supply scheme within Burdwan Sub-Division under Burdwan Division, PHE Dte.(Part-A)[SL NO.-08] | ORD/000745/2020-2021 | 587./BWD | 25/01/2021 | 15 | PAL CONSTRUCTION | 4.86 | 4.86 | 1 | |||
| 872 | Burdwan Division | Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Bagila village (Bagila Habitation) of Bagila piped water supply scheme within Burdwan Sub-Division under Burdwan Division, PHE Dte.(Part-B)[SL NO.-09] | ORD/000746/2020-2021 | 585./BWD | 25/01/2021 | 15 | HAMID SK | 4.87 | 4.87 | 1 | |||
| 873 | Burdwan Division | Extension of pipeline for SHURA (Zone-I) Piped W/S. Scheme Total 115 Nos. FHTC work for Sajal Gram (As per Field Verification Report for Har Ghar Jal Certification within Jamalpur Block including leftout household water tap connection (FHTC) under Burdwan Division, PHE Dte. | ORD/000751/2022-2023 | 1185/BWD | 15/03/2023 | 30 | SK NUR ALAM | 3.52 | 0.00 | 100 | |||
| 874 | Burdwan Division | Construction of Pump House cum chlorine room without sanitary and water supply arrangement at 2nd tube well site for Shaktigarh & its adjoining mouzas water supply scheme , Block-Bardhaman-II under Burdwan Division, PHE Dte.[Gr.-G] | ORD/000754/2021-2022 | 1391/BSD | 07/10/2021 | 60 | DEBJYOTI GOSWAMI | 2.77 | 0.00 | 1 | |||
| 875 | Burdwan Division | Extension Pipeline with Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of TARAPOSE Piped Water Supply Scheme within KHANDAGHOSH Block of Burdwan Sub-Division under Burdwan Division, PHE Dte. | ORD/000759/2022-2023 | 1289/BWD | 20/03/2023 | 30 | GENUINE ENGINEERING CO-OP. SOCIETY LTD. | 21.86 | 0.00 | 100 | |||
| 876 | Burdwan Division | Withdrawing and Relaying of Rising main line and Bullah pilling (60.0 mtr) at HD Works Site (near pond) due to Road widening from 4lane to 6 lane of NH2 at chanage 601+951 and 601+650 of ABUJHATI PWSS to in Jamalpur Block within Burdwan Sub-Division under Burdwan Division, PHE Dte. | ORD/000760/2022-2023 | 1290/BWD | 20/03/2023 | 30 | SOUMYAVASH DAS | 5.77 | 0.00 | 100 | |||
| 877 | Burdwan Division | Extension Pipeline with Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of Astikpur, Dakhinkul & Balagar of DERIAPUR Piped Water Supply Scheme within Raina I Block of Burdwan Sub-Division under Burdwan Division, PHE Dte. | ORD/000762/2022-2023 | 1296/BWD | 21/03/2023 | 651 | T.K. BANERJEE & CO. | 68.81 | 0.00 | 100 | |||
| 878 | Burdwan Division | Laying of 75 mm dia HDPE Pipe of Majhergram PWSS of Madhyamgram uttarpara village under Manteswar Block under Durgapur Sub Division of Burdwan Division ,P.H.E.Dte | ORD/000762/2024-2025 | 908/DSD | 28/10/2024 | 30 | M/S GOSWAMI CONSTRUCTION | 0.96 | 0.00 | 100 | |||
| 879 | Burdwan Division | Providing Functional House hold Tap connection (FHTC) from existing distribution system within the command area of ERUAR piped water supply scheme at Erusr (Part-C) (Eruar Part-C Habitation) village (Mouza) within Bhatar Block under Burdwan Division, PHE Dte. | ORD/000763/2020-2021 | 1265 /BWD | 11/02/2021 | 30 | S.T. ENTERPRISE | 18.05 | 12.40 | 1 | |||
| 880 | Burdwan Division | Providing Functional Household Tap connection (FHTC) from existing distribution system within the command area of ERUAR piped water supply scheme at Muratipur (Part) (Muratipur Part Habitation) village (Mouza) within Bhatar Block under Burdwan Division, PHE Dte._2nd Call. | ORD/000765/2020-2021 | 1266/BWD | 11/02/2021 | 30 | S.N. ENTERPRISE | 18.71 | 4.37 | 1 | |||
| 881 | Burdwan Division | Construction of Pump House cum chlorine room without sanitary and water supply arrangement at Tube Well Site to departmental drawing no-PHE/BD/P.H/DRG/02/DEC-17(Size 3.60 mtr x 3.00 mtr room) for PALSIT its Adjoining Mouza W/S Scheme, Block -Bardhaman-II within Burdwan Sub-Division, PHE Dte. (Mouza- KARANA) | ORD/000766/2022-2023 | 498/BSD | 21/03/2023 | 45 | M/S PALASH BISWAS | 3.32 | 0.00 | 100 | |||
| 882 | Burdwan Division | Extension of UPVC distribution pipeline sluice valve chamber & concrete work in regarding FHTC for Rayan water supply scheme of Bardhaman-I Development Block under Burdwan Division, PHE Dte.[Gr.-E] | ORD/000767/2021-2022 | 1428/BSD | 28/10/2021 | 30 | S.R. ENTERPRISE | 4.01 | 0.00 | 1 | |||
| 883 | Burdwan Division | Construction of Pump House cum chlorine room without sanitary and water supply arrangement at Tube Well Site to departmental drawing no-PHE/BD/P.H/DRG/02/DEC-17(Size 3.60 mtr x 3.00 mtr room) for SUHARI its Adjoining Mouza W/S Scheme, Block -Bardhaman-II within Burdwan Sub-Division, PHE Dte. (Mouza- PURBA KRISHNAPUR) | ORD/000767/2022-2023 | 502/BSD | 21/03/2023 | 45 | M/S PALASH BISWAS | 3.45 | 0.00 | 100 | |||
| 884 | Burdwan Division | Laying of UPVC pipe for providing FHTC in different habitaion of Ramchandrapur, Pranballabpur Mouza within Gopikantapur piped water supply scheme within Jamalpur Block under Burdwan Division, PHE Dte. [Gr.-B] | ORD/000768/2021-2022 | 1856/AE/HQ | 05/10/2021 | 30 | M/S S. CHOUDHURY | 4.82 | 0.00 | 1 | |||
| 885 | Burdwan Division | Laying of 75 mm and 50 mm dia UPVC pipe for providing FHTC at Kalnagram habitation of Kalna Mouza within Kanshra piped water supply scheme within Jamalpur Block under Burdwan Division, PHE Dte.[Gr.-C] | ORD/000769/2021-2022 | 1857/AE/HQ | 05/10/2021 | 30 | SANJAY SK | 3.50 | 0.00 | 1 | |||
| 886 | Burdwan Division | Earth work in excavation including shoring work of 700 cum capacity 20 Mtr staging height RCC Over Head Reservoir of Mahesdanga water supply scheme of Memari-I Block under Burdwan Division, PHE Dte.[Gr.-A] | ORD/000770/2021-2022 | 1365/BSD | 05/10/2021 | 5 | SK ALIM | 4.73 | 0.00 | 1 | |||
| 887 | Burdwan Division | Earth filling and sand filling in excavated portion and land development at Head work site of 700 cum capacity 20 Mtr staging height RCC Over Head Reservoir of Mahesdanga water supply scheme of Memari-I Block under Burdwan Division, PHE Dte.[Gr.-A] | ORD/000773/2021-2022 | 1408/BSD | 08/10/2021 | 5 | M/S PROCHESTA ENTERPRISE | 4.14 | 0.00 | 1 | |||
| 888 | Burdwan Division | Left out Functional House hold Tap Connection (FHTC) for MONDALGRAM and its adjoining Mouza W/S Scheme, block ¿Memari II within Burdwan Sub-Division, PHE Dte. | ORD/000773/2022-2023 | 1326/BWD | 22/03/2023 | 60 | DEBASHISH ENTERPRISE | 30.33 | 0.00 | 35 | |||
| 889 | Burdwan Division | Designing, Making and Erection of Sign Board for SAJAL GRAM in Tajpur Village, Burdwan - II Block within Suhari PWSS under Burdwan Division, PHE Dte. (5 Nos Board) | ORD/000773/2023-2024 | 853/AE/HQ | 06/11/2023 | 30 | MANABSEBA PROKALPA & CONSTRUCTIONS | 0.75 | 0.00 | 100 | |||
| 890 | Burdwan Division | Designing, Making and Erection of Sign Board for SAJAL GRAM in Mahipal Village, Burdwan - II Block within Raipur PWSS under Burdwan Division, PHE Dte. (5 Nos Board) | ORD/000775/2023-2024 | 854/AE/HQ | 06/11/2023 | 30 | MANABSEBA PROKALPA & CONSTRUCTIONS | 0.75 | 0.00 | 100 | |||
| 891 | Burdwan Division | Supply of SS316 grade flow control valve for FHTC at surface water based water supply scheme for Arsenic affected areas of Purbasthali-II Block within Kalna Sub-Division under Burdwan Division, PHE Dte.[Part-B] and delivered at Barsul Divisional store. | ORD/000776/2021-2022 | 4476/BWD | 03/09/2021 | 15 | INDIA PIPE FITTING CO | 17.62 | 0.00 | 1 | |||
| 892 | Burdwan Division | Designing, Making and Erection of Sign Board for SAJAL GRAM in Basatpur Village, Burdwan - II Block within Raipur PWSS under Burdwan Division, PHE Dte. (5 Nos Board) | ORD/000776/2023-2024 | 856/AE/HQ | 06/11/2023 | 30 | MANABSEBA PROKALPA & CONSTRUCTIONS | 0.75 | 0.00 | 100 | |||
| 893 | Burdwan Division | Laying of different dia.UPVC pipeline at the damaged portion from Denur to Mousa Daukadanga under Putsuri & its adjoining mouzas water supply scheme within Kalna Sub-Division, under Burdwan Division, PHE Dte. | ORD/000778/2021-2022 | 6013/BWD | 05/10/2021 | 30 | D.M. ENTERPRISE | 23.17 | 0.00 | 1 | |||
| 894 | Burdwan Division | Designing, Making and Erection of Sign Board for SAJAL GRAM in Purba Kashiara Village, Burdwan - II Block within Raipur PWSS under Burdwan Division, PHE Dte. (5 Nos Board) | ORD/000778/2023-2024 | 857/AE/HQ | 06/11/2023 | 30 | MANABSEBA PROKALPA & CONSTRUCTIONS | 0.75 | 0.00 | 100 | |||
| 895 | Burdwan Division | Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Ilsora village and Ilsora habitation of JAUGRAM Piped Water Supply Scheme within Burdwan Sub-Divn. under Burdwan Division, PHE. Dte. [Phase - I] [GROUP : ¿6A¿] | ORD/000779/2020-2021 | 3330/BWD | 18/09/2020 | 30 | MUKHERJEE ENTERPRISE | 4.86 | 0.00 | 1 | |||
| 896 | Burdwan Division | Extension of pipeline at Bagmara village of Orgram (Z-II) and its adjoining mouzas piped water supply scheme at Bhatar Block within Burdwan Sadar Sub-Division, under Burdwan Division, PHE Dte.[Gr.-G] | ORD/000781/2021-2022 | 952/BSD | 23/07/2021 | 30 | M/S S. CHOUDHURY | 2.01 | 0.00 | 1 | |||
| 897 | Burdwan Division | Designing, Making and Erection of Sign Board for SAJAL GRAM in Mallikpur Village, Memari - I Block within Uttar Radhakantapur PWSS under Burdwan Division, PHE Dte. (5 Nos Board) | ORD/000781/2023-2024 | 859/AE/HQ | 06/11/2023 | 30 | MANABSEBA PROKALPA & CONSTRUCTIONS | 0.75 | 0.00 | 100 | |||
| 898 | Burdwan Division | Designing, Making and Erection of Sign Board for SAJAL GRAM in Sahanagar Village, Memari - I Block within Uttar Radhakantapur PWSS under Burdwan Division, PHE Dte. (5 Nos Board) | ORD/000782/2023-2024 | 860/AE/HQ | 06/11/2023 | 30 | MANABSEBA PROKALPA & CONSTRUCTIONS | 0.75 | 0.00 | 100 | |||
| 899 | Burdwan Division | Designing, Making and Erection of Sign Board for SAJAL GRAM in Kamalpur Village, Memari - I Block within Uttar Radhakantapur PWSS under Burdwan Division, PHE Dte. (5 Nos Board) | ORD/000785/2023-2024 | 862/AE/HQ | 06/11/2023 | 30 | MANABSEBA PROKALPA & CONSTRUCTIONS | 0.75 | 0.00 | 100 | |||
| 900 | Burdwan Division | Designing, Making and Erection of Sign Board for SAJAL GRAM in Balidanga Village, Memari - I Block within Uttar Radhakantapur PWSS under Burdwan Division, PHE Dte. (5 Nos Board) | ORD/000786/2023-2024 | 863/AE/HQ | 06/11/2023 | 30 | MANABSEBA PROKALPA & CONSTRUCTIONS | 0.75 | 0.00 | 100 | |||
| 901 | Burdwan Division | Continuation work order for functional household tap connection (FHTC) at Baratikra village within the command area of Antpara piped water supply scheme at Jamalpur Block under Burdwan Division, PHE Dte.[Part-A][Gr.-D] | ORD/000790/2021-2022 | 1950/AE/HQ | 22/12/2021 | 30 | J. K. CORPORATION | 4.73 | 0.00 | 1 | |||
| 902 | Burdwan Division | Providing FHTC for 100% coverage in different village from existing distribution system within PALSIT PWSS, Bardhhaman-II Development Block under Burdwan Division, PHE Dte. | ORD/000790/2022-2023 | 1423/BWD | 24/03/2023 | 30 | BABUL SK | 28.53 | 0.00 | 100 | |||
| 903 | Burdwan Division | Continuation work order for Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Basuda village and Basuda Habitation of Serua piped water supply scheme within Durgapur (Bardhaman North) Sub-Division under Burdwan Division, PHE Dte. [Phase-I][Gr.-9A] | ORD/000791/2020-2021 | 4086/BWD | 16/10/2020 | 30 | DHIRENDRANATH SOM | 4.87 | 4.87 | 1 | |||
| 904 | Burdwan Division | Extension Pipeline with Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of MUGURA Piped Water Supply Scheme within Raina I Block of Burdwan Sub-Division under Burdwan Division, PHE Dte. | ORD/000792/2022-2023 | 1429/BWD | 24/03/2023 | 30 | J K CORPORATION | 18.57 | 0.00 | 100 | |||
| 905 | Burdwan Division | Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Jakra (Part) village (Innathgore Habitation) & Bohat (Part) village (Hamunpur Habitation) of Satgachia piped water supply scheme within Burdwan Sub-Division under Burdwan Division, PHE Dte.[Sl No.-21] | ORD/000793/2020-2021 | 71/BWD | 05/01/2021 | 15 | A R TRADERS | 4.86 | 4.86 | 0 | |||
| 906 | Burdwan Division | Designing, Making and Erection of Sign Board for SAJAL GRAM in Madhuban (P) Village, Kalna - I Block within Dharma Danga PWSS under Burdwan Division, PHE Dte. (5 Nos Board) | ORD/000794/2023-2024 | 873/AE/HQ | 07/11/2023 | 30 | PAPRI HAZRA | 0.76 | 0.00 | 100 | |||
| 907 | Burdwan Division | Designing, Making and Erection of Sign Board for SAJAL GRAM in Gopalpur Village, Jamalpur Block within Kulingram PWSS under Burdwan Division, PHE Dte. (5 Nos Board) | ORD/000796/2023-2024 | 875/AE/HQ | 07/11/2023 | 30 | PAPRI HAZRA | 0.76 | 0.00 | 100 | |||
| 908 | Burdwan Division | Designing, Making and Erection of Sign Board for SAJAL GRAM in Gangarambati Village, Jamalpur Block within Kulingram PWSS under Burdwan Division, PHE Dte. (5 Nos Board) | ORD/000797/2023-2024 | 876/AE/HQ | 07/11/2023 | 30 | PAPRI HAZRA | 0.76 | 0.00 | 100 | |||
| 909 | Burdwan Division | Providing 350 Nos. FHTC work at JALAHATI W/S scheme for Sajal Gram (As per Field Verification Report for Har Ghar Jal Certification) within Purbasthali-I Block including leftout household water tap connection (FHTC) under Burdwan Division, PHE Dte. | ORD/000800/2022-2023 | 1520/BWD | 28/03/2023 | 30 | IYASIN DAFADAR | 14.47 | 0.00 | 0 | |||
| 910 | Burdwan Division | Laying Parallel pipeline from Mankar Hattala to Bhattacharya para & restore to damage pipeline at difference location of Mallickpara for water supply smoothly of MANKAR (Z-II) and its adjoining mouza's Piped W/S Scheme at Galsi-I Block within Durgapur Sub Division under Burdwan Division, P.H.E. Dte. | ORD/000804/2023-2024 | 4819/BWD | 08/11/2023 | 60 | SHUBHRA KANTI GHOSH | 24.08 | 0.00 | 100 | |||
| 911 | Burdwan Division | Repairing and replace of damaged UPVC Pipeline with installation and construction of valve chamber for control of water flow within command area of AMRA Piped W/S Scheme at Dogachia habitation,Jamalpur Development Block under Burdwan Division,PHE Dte. | ORD/000806/2022-2023 | 429/BSD | 15/03/2023 | 30 | DEY NIRMAN | 0.89 | 0.00 | 100 | |||
| 912 | Burdwan Division | Construction of Pump House cum switch room (5.40 mtr x 3.60 mtr) with sanitary arrangement (as per drawing no. PHE/SE/CC/PH/DWG-01/2022-2023) at NANDAI Water Supply Scheme within Kalna Sub-Divn. under Burdwan Division, PHE Dte. Dist.-Purba Bardhaman. | ORD/000806/2023-2024 | 4820/BWD | 08/11/2023 | 352 | SK BADIUZZAMAL | 5.69 | 0.00 | 100 | |||
| 913 | Burdwan Division | Work Order for 'Laying distribution system including providing FHTC in the left out portion of Dharmadanga piped water supply scheme under Kalna Sub-Division under Burdwan Division, PHE Dte.'. | ORD/000806/2024-2025 | 1770/KSD | 20/11/2024 | 30 | BISWAS ENTERPRISE | 1.67 | 0.00 | 100 | |||
| 914 | Burdwan Division | Laying of interconnection between 4th tube well to OHR for Nabastha Water Supply Scheme within Burdhaman-II Block , under Burdwan Division, PHE Dte. | ORD/000807/2022-2023 | 430/BSD | 15/03/2023 | 30 | D.M. ENTERPRISE | 0.91 | 0.00 | 100 | |||
| 915 | Burdwan Division | Work order for 'Restoration of Concrete work and land development at Head Work Site of Manikhar PWSS under Kalna Sub-Division under Burdwan Division, PHE Dte.'. | ORD/000807/2024-2025 | 1771/KSD | 20/11/2024 | 30 | BISWAS ENTERPRISE | 3.26 | 0.00 | 100 | |||
| 916 | Burdwan Division | Extension of different dia UPVC pipeline (suggested) as per survey of Horizon of Zone-I portion of surface based water supply scheme in Arsenic affected areas of Purbasthali-II Block within Kalna Sub-Division under Burdwan Division, PHE Dte. | ORD/000810/2020-2021 | 826/BWD | 01/02/2021 | 60 | DEY NIRMAN | 24.83 | 17.35 | 1 | |||
| 917 | Burdwan Division | Extension Pipeline with Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of Anguna, Sanktia, Gunar village of ANGUNA Piped Water Supply Scheme within Raina I Block of Burdwan Sub-Division under Burdwan Division, PHE Dte. | ORD/000811/2022-2023 | 1575/BWD | 31/03/2023 | 60 | JAGADANANDAPUR CO. OP. LABOUR CONTRACT AND CONSTRUCTION SOCIETY LTD. | 33.16 | 0.00 | 100 | |||
| 918 | Burdwan Division | Interconnection between inlet & delivery pipe with main distribution pipeline within command area of ITLA Piped W/S. Scheme, Jamalpur Block under Burdwan Division, PHE. Dte. | ORD/000825/2022-2023 | 213/AE/HQ | 31/03/2023 | 30 | BHARAT CONSTRUCTION | 0.87 | 0.00 | 0 | |||
| 919 | Burdwan Division | Interconnection between inlet & delivery pipe with main distribution pipeline within command area of KANSHRA Piped W/S. Scheme, Jamalpur Block under Burdwan Division, PHE. Dte. | ORD/000826/2022-2023 | 214/AE/HQ | 31/03/2023 | 30 | OM ENTERPRISE | 0.87 | 0.00 | 100 | |||
| 920 | Burdwan Division | Extension of pipeline for KANSHRA Piped Water Supply Scheme at Natungram Habitation in Jamalpur Block under Burdwan Division, PHE Dte. | ORD/000827/2022-2023 | 215/AE/HQ | 31/03/2023 | 30 | DEBASHISH ENTERPRISE | 0.95 | 0.00 | 100 | |||
| 921 | Burdwan Division | Extension of 63 mm dia UPVC pipeline to provide house connection to the beneficiaries of Rahatpur water supply scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. [Sl No.-B] | ORD/000828/2020-2021 | 139/KSD | 12/02/2021 | 30 | DUBE ENTERPRISE | 4.49 | 0.00 | 1 | |||
| 922 | Burdwan Division | Extension of pipeline for KANSHRA Piped Water Supply Scheme at Badalpur Habitation in Jamalpur Block under Burdwan Division, PHE Dte. | ORD/000828/2022-2023 | 216/AE/HQ | 31/03/2023 | 30 | DEBASHISH ENTERPRISE | 0.95 | 0.00 | 100 | |||
| 923 | Burdwan Division | Extension of different dia UPVC pipeline at Rameswarpur village of Dharmadanga water supply scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. [Sl No.-A] | ORD/000829/2020-2021 | 167/KSD | 19/02/2021 | 30 | BISHWAJIT DAS | 3.97 | 0.00 | 1 | |||
| 924 | Burdwan Division | Construction of sluice valve chamber & supply of sluice valve for extension of pipeline for KANSHRA Piped W/S. Scheme, Jamalpur Block under Burdwan Division, PHE. Dte. | ORD/000829/2022-2023 | 217/AE/HQ | 31/03/2023 | 30 | DEBASHISH ENTERPRISE | 0.92 | 0.00 | 100 | |||
| 925 | Burdwan Division | Extension of UPVC pipeline of laying distribution system at Moukata village at Bhatkunda and its adjoining mouzas water supply scheme within Ausgram-II Block under Durgapur Sub-Division under Burdwan Division, PHE Dte. [Gr.-D] | ORD/000835/2020-2021 | 171/DSD | 19/02/2021 | 21 | SHUBHRA KANTI GHOSH | 4.62 | 0.00 | 1 | |||
| 926 | Burdwan Division | Retrofitting of RCC Elevated Reservoir (Capacity 450 Cum) by Shortcreting, Guniting etc. in connection with Augmentation of Mankar W/S. Scheme (Zone - I) under Burdwan Division, PHE. Dte. | ORD/000835/2021-2022 | 6043/BWD | 07/10/2021 | 45 | SUDIPTO GORAIN | 19.85 | 0.00 | 1 | |||
| 927 | Burdwan Division | Continuation work order for water tap connection in each house hold from existing distribution system within scheme jurisdiction in Rahatpur village and Rahatpur habitation of Rahatpur piped water supply scheme within Kalna Sub-Division under Burdwan Division, PHE Dte.[Phase-I][Gr.-7A] | ORD/000837/2020-2021 | 4913./BWD | 08/12/2020 | 30 | DUBE ENTERPRISE | 4.31 | 0.00 | 1 | |||
| 928 | Burdwan Division | Construction of Approach P.C.C Road & Circular Soak Well At Head works site of MASAGRAM Zone-II Piped W/S. Scheme at Jamalpur Dev. Block under Burdwan Division, PHE Dte._2ND CALL | ORD/000837/2024-2025 | 966/AE/HQ | 22/11/2024 | 30 | SOUMYAVASH DAS | 0.93 | 0.00 | 0 | |||
| 929 | Burdwan Division | Providing FHTC for Declaration of Sajal Gram at Duttapara (25 Nos), Kamalpur (04 Nos) and Chak Mujaffarpur (07) Mouzas (Habitation) for KULINGRAM Piped W/S Scheme, Jamalpur Dev. Block under Burdwan Division, PHE Dte._2ND CALL | ORD/000838/2024-2025 | 967/AE/HQ | 22/11/2024 | 30 | SOUMYAVASH DAS | 2.47 | 0.00 | 100 | |||
| 930 | Burdwan Division | Extension of 75 mm dia UPVC pipeline at different places of Denur village under Putsuri & its adjoining mouzas water supply scheme within Kalna Sub-Division under Burdwan Division, PHE Dte.[SL NO.-C] | ORD/000839/2020-2021 | 169/KSD | 19/02/2021 | 30 | M/S S. CHOUDHURY | 2.37 | 0.00 | 1 | |||
| 931 | Burdwan Division | Construction of Pump House cum chlorine room without sanitary and water supply arrangement at Tube Well Site to departmental drawing no-PHE/BD/P.H/DRG/02/DEC-17(Size 3.60 mtr x 3.00 mtr room) for RAIPUR its Adjoining Mouza W/S Scheme, Block -Bardhaman-II within Burdwan Sub-Division, PHE Dte. (Mouza- PURBA KASHIARA) | ORD/000839/2022-2023 | 501/BSD | 21/03/2023 | 45 | IRIN CONSTRUCTION CO. | 3.30 | 0.00 | 100 | |||
| 932 | Burdwan Division | Construction of Pump House cum chlorine room without sanitary and water supply arrangement at Tube Well Site to departmental drawing no-PHE/BD/P.H/DRG/02/DEC-17(Size 3.60 mtr x 3.00 mtr room) for MONDALGRAM its Adjoining Mouza W/S Scheme, Block -Memari-II within Burdwan Sub-Division, PHE Dte. (Mouza- Untia) | ORD/000840/2022-2023 | 508/BSD | 21/03/2023 | 45 | NARSAD SAIKH | 3.12 | 0.00 | 100 | |||
| 933 | Burdwan Division | Construction of Pump House cum chlorine room without sanitary and water supply arrangement at Tube Well Site to departmental drawing no-PHE/BD/P.H/DRG/02/DEC-17(Size 3.60 mtr x 3.00 mtr room) for AJHAPUR its Adjoining Mouza W/S Scheme, Block -Jamalpur within Burdwan Sub-Division, PHE Dte. (Mouza- SALMULA) | ORD/000841/2022-2023 | 507/BSD | 21/03/2023 | 45 | M/S MA TARA ENTERPRISE | 3.29 | 0.00 | 100 | |||
| 934 | Burdwan Division | Extension of pipeline at Kuldiha & Raniganj village of PRATAPPUR (ZONE-II) and its adjoining mouza's Piped W/S Scheme at Ausgram-II Block within Durgapur Sub Division under Burdwan Division, P.H.E. Dte. [Gr.-E] | ORD/000843/2020-2021 | 172/DSD | 19/02/2021 | 21 | RELIABLE ENGINEERS CO.-OPERATIVE CONSTRUCTION SOCIETY LTD. | 4.73 | 0.00 | 1 | |||
| 935 | Burdwan Division | Extension of UPVC pipe line of LDS at Khanhati and Patrahati Mouza for providing FHTC of Adra and its adjoining mouzas W/S Scheme under Durgapur Sub-Division, Burdwan Division, P.H.E. Dte.[SL-23] | ORD/000844/2022-2023 | 706/DSD | 31/12/2022 | 30 | UTPAL NANDI | 4.46 | 0.00 | 0 | |||
| 936 | Burdwan Division | Protection work of distribution system (200 mm dia) of 35 Mtr length near the head work site (Right Side) of Sultanpur & its adjoining mouzas water supply scheme by UC Bullah including Drum Sheet within Kalna Sub-Division under Burdwan Division, PHE Dte.[Gr.-E] | ORD/000845/2020-2021 | 20/KSD | 07/01/2021 | 30 | DEBASHISH ENTERPRISE | 0.75 | 0.00 | 1 | |||
| 937 | Burdwan Division | Continuation work order for Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Madhabpur village and Madhabpur habitation of MADHABPUR Piped Water Supply Scheme within Burdwan Sub-Divn. under Burdwan Division, PHE. Dte. [Phase - I] [GROUP : ¿7C¿] | ORD/000846/2020-2021 | 7050/BWD | 22/12/2020 | 30 | KAJAL MUKHERJEE | 4.86 | 0.00 | 1 | |||
| 938 | Burdwan Division | Extension of UPVC pipe line of LDS at Hanrgram Khaspara, Chhatipara and Daspara for providing FHTC of Amarun and its adjoining mouzas W/S Scheme (Zone-II) under Durgapur Sub-Division, Burdwan Division, P.H.E. Dte.[SL-29] | ORD/000846/2022-2023 | 708/DSD | 31/12/2022 | 30 | NANGTASWAR CO. OP. LABOUR CONT. AND CONSTRUCTION SOCIETY LTD. | 4.61 | 0.00 | 100 | |||
| 939 | Burdwan Division | Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Madhabpur village and Madhabpur habitation of MADHABPUR Piped Water Supply Scheme within Burdwan Sub-Divn. under Burdwan Division, PHE. Dte. [Phase - I] [GROUP : ¿7C¿] | ORD/000847/2020-2021 | 3334/BWD | 18/09/2020 | 30 | KAJAL MUKHERJEE | 4.86 | 0.00 | 1 | |||
| 940 | Burdwan Division | Providing Balance Functional Household Tap Connection(FHTC)for Swajal Gram from existing distribution system within the command area of Idilpur & Fakirpur Village under of FAKIRPUR W.S.Scheme of Burdwan-I Block of Burdwan Sub-Division under Burdwan Division, PHE Dte. | ORD/000847/2022-2023 | 1380-A/BSD | 05/08/2022 | 5 | BAMDEB CONSTRUCTION & CO | 0.96 | 0.00 | 0 | |||
| 941 | Burdwan Division | Extension of pipeline for KENNA Piped Water Supply Scheme at Kaliashpur 25 Nos FHTC Work for Sajal Gram (As per Field Verification Report for Har Ghar Jal Certification within Memari-I Block including leftout household water tap connection (FHTC) under Burdwan Division, PHE Dte. | ORD/000848/2022-2023 | 1391-A/BSD | 08/08/2022 | 5 | BRINDABAN KONAR | 0.97 | 0.00 | 0 | |||
| 942 | Burdwan Division | Extension of pipeline including FHTC for SIPTAI Piped Water Supply Scheme at Pirijpur (40 Nos) Habitation for Sajal Gram (As per field verification report duly signed by Pradhan for Har Ghar Jal Certification) within Jamalpur Block under Burdwan Division, PHE Dte. | ORD/000849/2022-2023 | 1392-A/BSD | 08/08/2022 | 5 | ROY CONSTRUCTION | 0.95 | 0.00 | 0 | |||
| 943 | Burdwan Division | Extension of pipeline including FHTC for SIPTAI Piped Water Supply Scheme at Siptai (42 Nos) Habitation for Sajal Gram (As per field verification report duly signed by Pradhan for Har Ghar Jal Certification) within Jamalpur Block under Burdwan Division, PHE Dte. | ORD/000850/2022-2023 | 1393-A/BSD | 08/08/2022 | 5 | ROY CONSTRUCTION | 0.97 | 0.00 | 100 | |||
| 944 | Burdwan Division | Restoration of concrete road ,construction of valve chamber of JOTRAGHAB Piped Water Supply Scheme and its adjoining mouzas within JAMALPUR block under Burdwan Division, PHE Dte. | ORD/000850/2023-2024 | 2738/BSD | 28/11/2023 | 30 | A R TRADERS | 0.96 | 0.00 | 100 | |||
| 945 | Burdwan Division | Extension of pipeline including providing FHTC for Siptai Piped Water Supply Scheme at Ilampur[30 No's],Habitation for Sajal Gram (As per Sajal Gram(As per Field Verification Report duly signed by Pradhan for Har Ghar Jal Certification)within Jamalpur Block under Burdwan Division, PHE Dte. | ORD/000851/2022-2023 | 1394-A/BSD | 08/08/2022 | 5 | ROY CONSTRUCTION | 0.96 | 0.00 | 100 | |||
| 946 | Burdwan Division | Installation of Sluice Valve, Air Valve and inter connection of Pipeline and allied works to regulate the water supply towards Ashinda & Takipur Village of TAKIPUR and its adjoining mouza's Piped W/S Scheme at Ausgram-I Block within Durgapur Sub Division under Burdwan Division, P.H.E. Dte. [SL-09] | ORD/000852/2022-2023 | 709/DSD | 30/12/2022 | 30 | HAMID SK | 4.71 | 0.00 | 0 | |||
| 947 | Burdwan Division | Extension of pipeline at Patna village of Bolgona and its adjoining mouza's Piped W/S Scheme at Bhatar Block within Durgapur Sub Division under Burdwan Division, P.H.E. Dte. [SL-10] | ORD/000853/2022-2023 | 710/DSD | 30/12/2022 | 30 | NANGTASWAR CO. OP. LABOUR CONT. AND CONSTRUCTION SOCIETY LTD. | 4.65 | 0.00 | 0 | |||
| 948 | Burdwan Division | Laying of additional pipeline to facilitate FHTC at Patna village of Bolgona and its adjoining mouza's Piped W/S Scheme at Bhatar Block within Durgapur Sub Division under Burdwan Division, P.H.E. Dte. [SL-11] | ORD/000854/2022-2023 | 711/DSD | 30/12/2022 | 30 | NANGTASWAR CO. OP. LABOUR CONT. AND CONSTRUCTION SOCIETY LTD. | 4.09 | 0.00 | 0 | |||
| 949 | Burdwan Division | Crossing of Mankar-Guskara Bolgona Road at Head works site of Mankar (Z-I) W/S Scheme for laying distribution and rising main through pushing of 750mm.dia. RCC casing pipe by hydraulic jacking method for Mankar (Z-I) W/S Scheme under Durgapur (Bardhaman North) Sub Division, Burdwan Division, PHE Dte.[SL-12] | ORD/000855/2022-2023 | 712/DSD | 30/12/2022 | 30 | SHUBHRA KANTI GHOSH | 4.74 | 0.00 | 100 | |||
| 950 | Burdwan Division | Extension of UPVC pipe line of LDS at Palsona Mouza for providing FHTC of Amarun and its adjoining mouzas W/S Scheme (Phase-II) under Durgapur Sub-Division, Burdwan Division, P.H.E. Dte. [SL-15] | ORD/000857/2022-2023 | 714/DSD | 30/12/2022 | 30 | SANDIPAN SENGUPTA | 4.81 | 0.00 | 100 | |||
| 951 | Burdwan Division | Extension of UPVC pipe line of LDS at Bijyapur Mouza for providing FHTC of Amarun and its adjoining mouzas W/S Scheme under Durgapur Sub-Division, Burdwan Division, P.H.E. Dte. [SL-16] | ORD/000858/2022-2023 | 715/DSD | 30/12/2022 | 30 | SAMANTA CONSTRUCTION | 4.83 | 0.00 | 100 | |||
| 952 | Burdwan Division | Extension of 63 mm dia UPVC pipeline to provide house connection to the beneficiaries of Sihigram village of Majhergram water supply scheme within Kalna Sub-Division under Burdwan Division, PHE Dte.[Sl No.-D] | ORD/000859/2020-2021 | 141/KSD | 12/02/2021 | 30 | GOUTAM DEY | 3.14 | 0.00 | 1 | |||
| 953 | Burdwan Division | Restoration of damaged pipeline of distribution main for construction of drain, concrete road etc at various point at Sunur, and Amarun village for providing FHTC within Amarun W/S Scheme (Zone-I &II) in Bhatar Block under Burdwan Division, P.H.E. Dte. [SL-17] | ORD/000859/2022-2023 | 716/DSD | 30/12/2022 | 30 | SAMANTA CONSTRUCTION | 1.93 | 0.00 | 100 | |||
| 954 | Burdwan Division | Relaying of pipeline damaged by construction of Road/Drain etc. at different location of Pubar and its adjoining mouzas water supply scheme at Ausgram-II Block within Durgapur Sub-Division, under Burdwan Division, PHE Dte. [SL-20] | ORD/000862/2022-2023 | 719/DSD | 30/12/2022 | 30 | ASRUL HAQUE MONDAL | 0.88 | 0.00 | 100 | |||
| 955 | Burdwan Division | Sinking of additional Tube Well, construction of pump house & boundary wall & laying interconnection of SONARUDRA Piped water supply scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. (PP Site- Shyambati Baidyapur). | ORD/000864/2023-2024 | 5295/BWD | 01/12/2023 | 60 | HI-LIGHT ELECTRONICS | 27.37 | 0.00 | 60 | |||
| 956 | Burdwan Division | Extension of pipeline for providing functional house hold tap connection at Jotsubal village within Kanshra water supply scheme under Burdwan Division, PHE Dte. [Gr.-A] | ORD/000866/2020-2021 | 1256/AE/HQ | 15/02/2021 | 30 | ROY CONSTRUCTION | 4.84 | 0.00 | 1 | |||
| 957 | Burdwan Division | Making Connection with 90 mm dia uPVC pipe within Node 162-168 for improvement of water supply to FHTC at Taranagar village within Jaykrishnapur and its adjoining mouzas W/S Scheme under Durgapur Sub-Division, Burdwan Division, P.H.E. Dte. [SL-24] | ORD/000866/2022-2023 | 722/DSD | 30/12/2022 | 30 | TARAMA AGENCY | 2.07 | 0.00 | 100 | |||
| 958 | Burdwan Division | Continuation work order for supply of 10 mm NB Gun-Metal /Brass Ferrul conforming to IS:2692-1989 for water tap connection in each household from existing distribution system within scheme jurisdiction in different piped water supply scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. and delivered at Barsul Divisional Store.[Part-6] | ORD/000867/2020-2021 | 4318/BWD | 04/11/2020 | 10 | MD HASIN | 4.93 | 0.00 | 1 | |||
| 959 | Burdwan Division | Extension of UPVC pipe line of LDS at Kubajpur Adibasipara and Erachya for providing FHTC of Amarun and its adjoining mouzas W/S Scheme (Zone-II) under Durgapur Sub-Division, Burdwan Division, P.H.E. Dte. [SL-26] | ORD/000868/2022-2023 | 724/DSD | 30/12/2022 | 30 | NANGTASWAR CO. OP. LABOUR CONT. AND CONSTRUCTION SOCIETY LTD. | 4.58 | 0.00 | 100 | |||
| 960 | Burdwan Division | Extension of UPVC pipe line of LDS at Nandanarayanpur and Paschimpara for providing FHTC of Amarun and its adjoining mouzas W/S Scheme (Zone-II) under Durgapur Sub-Division, Burdwan Division, P.H.E. Dte. [SL-27] | ORD/000869/2022-2023 | 725/DSD | 30/12/2022 | 30 | BABA ADHIRA CONSTRUCTION | 4.83 | 0.00 | 100 | |||
| 961 | Burdwan Division | Extension of UPVC pipe line of LDS at Ramnagar Mouza for providing FHTC of Amarun and its adjoining mouzas W/S Scheme (Zone-II) under Durgapur Sub-Division, Burdwan Division, P.H.E. Dte. [SL-28] | ORD/000870/2022-2023 | 726/DSD | 30/12/2022 | 30 | NANGTASWAR CO. OP. LABOUR CONT. AND CONSTRUCTION SOCIETY LTD. | 4.16 | 0.00 | 100 | |||
| 962 | Burdwan Division | Replacement of fully damaged PVC water supply line at Dulepara along National Highway for MAHESDANGA and its adj.mouza W/S Scheme,Block:Memari-I within Burdwan Sub-Division,PHE Dte | ORD/000870/2023-2024 | 2746/BSD | 28/11/2023 | 30 | SUPRIYA RAY | 0.96 | 0.00 | 100 | |||
| 963 | Burdwan Division | Extension of UPVC pipe line of LDS at Hanrgram Uttarpara, Majhipukur par and Dulepara for providing FHTC of Amarun and its adjoining mouzas W/S Scheme (Zone-II) under Durgapur Sub-Division, Burdwan Division, P.H.E. Dte.[SL-30] | ORD/000871/2022-2023 | 727/DSD | 30/12/2022 | 30 | RAM MOHAN MUKHERJEE | 4.78 | 0.00 | 100 | |||
| 964 | Burdwan Division | KHETIA Piped Water Supply Scheme with Rising Main & Construction of 200 cum capacity RCC OHR with 20.0 mtr. with Staging height including soil investigation at different TW site under BARDHAMAN-I Block, District:- Purba-Bardhaman. | ORD/000874/2023-2024 | 5330/BWD | 04/12/2023 | 542 | THE DEVELOPER | 68.62 | 0.00 | 56 | |||
| 965 | Burdwan Division | Extension of UPVC pipe line of LDS at Kapshor village for providing FHTC of Bhatar and its adjoining mouzas W/S Scheme (Zone-I) under Durgapur Sub-Division, Burdwan Division, P.H.E. Dte. [SL-2] | ORD/000875/2022-2023 | 728/DSD | 30/12/2022 | 21 | DHIRENDRANATH SOM | 0.95 | 0.00 | 100 | |||
| 966 | Burdwan Division | Extension of UPVC pipe line of LDS at Belenda Purbapara for providing FHTC of Bhatar and its adjoining mouzas W/S Scheme (Zone-II) under Durgapur Sub-Division, Burdwan Division, P.H.E. Dte. [SL-03] | ORD/000876/2022-2023 | 729/DSD | 30/12/2022 | 21 | DHIRENDRANATH SOM | 0.95 | 0.00 | 100 | |||
| 967 | Burdwan Division | Extension of UPVC pipe line of LDS at Bamshor and Belenda Purbapara for providing FHTC of Bhatar and its adjoining mouzas W/S Scheme (Zone-II) under Durgapur Sub-Division, Burdwan Division, P.H.E. Dte. [SL-04] | ORD/000877/2022-2023 | 730/DSD | 30/12/2022 | 21 | DHIRENDRANATH SOM | 0.96 | 0.00 | 100 | |||
| 968 | Burdwan Division | Extension of UPVC pipe line of LDS at Balsidanga village for providing FHTC of Bhatar and its adjoining mouzas W/S Scheme (Zone-I) under Durgapur Sub-Division, Burdwan Division, P.H.E. Dte. [SL-05] | ORD/000878/2022-2023 | 731/DSD | 30/12/2022 | 21 | DHIRENDRANATH SOM | 0.89 | 0.00 | 100 | |||
| 969 | Burdwan Division | Carriage of withdrawal stacked DI pipes of rising main from Adrahati to Barsul Divisional store and restoration of damaged pipeline of distribution main for construction of drain, concrete road etc at various point at Khanhati village for providing FHTC within Adra W/S Scheme in Galsi-II Block under Durgapur Sub Division, P.H.E. Dte. [SL-06] | ORD/000879/2022-2023 | 732/DSD | 30/12/2022 | 21 | SHUBHRA KANTI GHOSH | 0.61 | 0.00 | 25 | |||
| 970 | Burdwan Division | Extension of UPVC pipe line of LDS near rail crossing at Balsidanga for providing FHTC of Bhatar and its adjoining mouzas W/S Scheme (Zone-II) under Durgapur Sub-Division, Burdwan Division, P.H.E. Dte. [SL-8] | ORD/000881/2022-2023 | 734/DSD | 30/12/2022 | 21 | DHIRENDRANATH SOM | 0.96 | 0.00 | 100 | |||
| 971 | Burdwan Division | Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of ADRA Piped Water Supply Scheme at Kaitara village, Galsi-II Block within Durgapur (Burdwan North) Sub Division under Burdwan Division, P.H.E. Dte. [SL-9] | ORD/000882/2022-2023 | 735/DSD | 30/12/2022 | 21 | SHUBHRA KANTI GHOSH | 0.97 | 0.00 | 100 | |||
| 972 | Burdwan Division | Providing FHTC work at Suipara village (13 Nos), Tehata village (52 Nos), Bajitpur village (18 Nos) Narenga village (282 nos) & Baitipara village (52 Nos) under TEHATA Zone-I Water Supply Scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. | ORD/000883/2023-2024 | 5516/BWD | 14/12/2023 | 30 | YOUNG ENGINEERS CO.-OPERATIVE SOCIETY LTD. | 19.32 | 0.00 | 0 | |||
| 973 | Burdwan Division | Providing FHTC work at Agradaha village (25 Nos), Jhikra village (20 Nos), Kutubpur village (122 Nos) Habibpur village (232 Nos) & Bajitpur village (16 Nos) under Tehata Zone-II Water Supply Scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. | ORD/000884/2023-2024 | 5515/BWD | 14/12/2023 | 30 | YOUNG ENGINEERS CO.-OPERATIVE SOCIETY LTD. | 23.96 | 0.00 | 0 | |||
| 974 | Burdwan Division | Restoration of damaged pipeline during construction of drain, concrete road etc and making valve chamber at various point at Kashipur village within Kashipur W/S Scheme in Bhatar Block under Burdwan Division, P.H.E. Dte. [SL-14] | ORD/000886/2022-2023 | 739/DSD | 30/12/2022 | 21 | PAPRI HAZRA | 0.87 | 0.00 | 100 | |||
| 975 | Burdwan Division | Painting and renovation work of WTP Building, Boundary Wall, Truss Bridge etc. at Kamalnagar of Surface Water Based Water Supply Scheme within Kalna Sub-Divn. under Burdwan Division, PHE. Dte. | ORD/000886/2023-2024 | 5517/BWD | 14/12/2023 | 30 | SETH ENTERPRISE | 12.63 | 0.00 | 100 | |||
| 976 | Burdwan Division | Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Mohara (Part) Village of Adra Piped W/S Scheme within Durgapur (Bardhaman North) Sub-Division under Burdwan Division, P.H.E. Dte. [SL-12] | ORD/000888/2022-2023 | 737/DSD | 30/12/2022 | 21 | SHUBHRA KANTI GHOSH | 0.94 | 0.00 | 100 | |||
| 977 | Burdwan Division | Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Kaitara (Part) Village of Adra Piped W/S Scheme within Durgapur (Bardhaman North) Sub-Division under Burdwan Division, P.H.E. Dte. [SL-11] | ORD/000889/2022-2023 | 736/DSD | 30/12/2022 | 21 | SHUBHRA KANTI GHOSH | 0.96 | 0.00 | 100 | |||
| 978 | Burdwan Division | Repairing and Renovation of Filter Bed, Main Boundary Gate, resetting of Paver Block Pathway, replacement of different damaged portion of doors/windows or any other structures & other related works for Kamalnagar WTP within Kalna Sub Division under Burdwan Division, P.H.E. Dte. | ORD/000894/2023-2024 | 5510/BWD | 14/12/2023 | 120 | GHOSH BROTHERS | 47.97 | 0.00 | 5 | |||
| 979 | Burdwan Division | Re-Laying of UPVC Pipeline (damaged by Local Irrigation Work) for providing FHTC at Bag Kalapahar Mouza (Habitation) under ITLA Piped Water Supply Scheme, Jamalpur Development Block under Burdwan Division, PHE Dte. | ORD/000903/2023-2024 | 5513/BWD | 14/12/2023 | 30 | UTPAL NANDI | 8.61 | 0.00 | 100 | |||
| 980 | Burdwan Division | Continuation work order for water tap connection in each household from existing distribution system within scheme jurisdiction in Kuli habitation of Shushunia piped water supply scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. [Gr.-H] | ORD/000910/2020-2021 | 4787./BWD | 02/12/2020 | 30 | SUSUNIA GP CO. OPERATIVE LABOUR CONTRACT AND CONSTRUCTION SOCIETY LTD. | 2.92 | 0.00 | 1 | |||
| 981 | Burdwan Division | Preparation and Submission of DPR for Retrofitting of Mugura PWSS under Raina-I Development Block under Burdwan Division, P.H.E Dte(2nd Call) | ORD/000913/2023-2024 | 2831/BSD | 07/12/2023 | 15 | MEASURE LAND | 0.78 | 0.00 | 100 | |||
| 982 | Burdwan Division | Continuation work order for Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Bamangaria village and Bamungoria habitation of Bamungoria Piped Water Supply Scheme within Kalna Sub-Divn. under Burdwan Division, PHE. Dte. [Phase - I] [GROUP : ¿10A¿] | ORD/000920/2020-2021 | 151/BWD | 08/01/2021 | 30 | PAL CONSTRUCTION | 1.73 | 0.00 | 1 | |||
| 983 | Burdwan Division | Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of PRATAPPUR Piped Water Supply Scheme at Raniganj (Part), Babuisol (Part), Pratappur (Part), village, habitation, Ausgram-II Block within Durgapur (Burdwan North) Sub Division under Burdwan Division, P.H.E. Dte. | ORD/000920/2023-2024 | 5482/BWD | 13/12/2023 | 30 | N.S. ENTERPRISE | 10.92 | 0.00 | 100 | |||
| 984 | Burdwan Division | Providing FHTC for 100% coverage at Srimanpur (Village) (Habitation) for SIPTAI Piped W/S Scheme, Jamalpur Dev. Block under Burdwan Division, PHE Dte. | ORD/000921/2023-2024 | 5487/BWD | 13/12/2023 | 30 | GOUTAM KUMAR MITRA | 4.34 | 0.00 | 100 | |||
| 985 | Burdwan Division | Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of SIALI Piped Water Supply Scheme at Ujirpur (Par Ujirpur & Ujirpur Habitation) Village (Mouza), Jamalpur Block under Burdwan Division, PHE Dte._2ND CALL. | ORD/000922/2020-2021 | 1546/BWD | 22/02/2021 | 30 | SKILLS AND FACILITY TRAINING INSTITUTE | 18.87 | 0.00 | 1 | |||
| 986 | Burdwan Division | Construction of Pump House, Boundary walls and Raising Main for Aug. of JAGGESWARDIHI Piped Water Supply Scheme under Mongalkote Block, District:- Purba-Bardhaman. | ORD/000922/2023-2024 | 5494/BWD | 13/12/2023 | 385 | PAPRI HAZRA | 10.13 | 0.00 | 75 | |||
| 987 | Burdwan Division | Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of SIALI Piped Water Supply Scheme at Siali (Math Siali & Siali Habitation) Village (Mouza), Jamalpur Block under Burdwan Division, PHE Dte._2ND CALL. | ORD/000923/2020-2021 | 1709/BWD | 25/02/2021 | 30 | SKILLS AND FACILITY TRAINING INSTITUTE | 18.33 | 0.00 | 1 | |||
| 988 | Burdwan Division | Laying of rising main for interconnection of Pump House 1 & 2 and distribution main along with bye pass arrangement for Over Head Reservoir for Shura piped water supply scheme (Zone-II) within Jamalpur Block under Burdwan Division, PHE Dte.[Gr.-B] | ORD/000924/2020-2021 | 1226/AE/HQ | 10/02/2021 | 30 | M/S UNIT CONSTRUCTION | 4.29 | 0.00 | 1 | |||
| 989 | Burdwan Division | Laying of interconnection of both the Pump No.1,2 & 3 and distribution main of 250 mm dia along with Byw-Pass arrangement from Over Head Reservoir for Chak Shanjadi piped water supply scheme within Jamalpur Block under Burdwan Division, PHE Dte. | ORD/000925/2020-2021 | 4970/BWD | 10/12/2020 | 30 | TIRUPATI ENTERPRISES | 8.98 | 0.00 | 1 | |||
| 990 | Burdwan Division | Laying of rising main for interconnection of Pump House -1 &2 and distribution main alongwith bye-pass arrangement for Over Head Reservoir for Shura piped water supply scheme (Zone-I) within Jamalpur Block under Burdwan Division, PHE Dte.[Gr.-A] | ORD/000929/2020-2021 | 1228/AE/HQ | 10/02/2021 | 30 | BENGAL BUILDERS | 4.71 | 0.00 | 1 | |||
| 991 | Burdwan Division | Repairing of valve chamber & Construction of new valve chamber and supply of sluice valve at Head Works Site for CHAKTATUL PWSS within Durgapur Sub- Division (Burdwan North) under Burdwan Division PHE Dte. | ORD/000932/2023-2024 | 905/DSD | 15/12/2023 | 30 | SAIKAT RAY | 0.97 | 0.00 | 0 | |||
| 992 | Burdwan Division | Laying of interconnection of Head Works Site to distribution main line for CHAKTATUL PWSS within Durgapur Sub- Division (Burdwan North) under Burdwan Division PHE Dte. | ORD/000933/2023-2024 | 906/DSD | 15/12/2023 | 45 | SAIKAT RAY | 0.95 | 0.00 | 100 | |||
| 993 | Burdwan Division | Laying of UPVC pipeline in Pallar habitation (Palar Asram Para North side) with Bhatar Zone-I PWSS within Durgapur Sub- Division (Burdwan North) under Burdwan Division PHE Dte. | ORD/000934/2023-2024 | 907/DSD | 15/12/2023 | 45 | PAPRI HAZRA | 0.80 | 0.00 | 100 | |||
| 994 | Burdwan Division | Laying of UPVC pipeline in Bardanga Adibasipara ,Vill-Satkhali within Bhatar Zone-II PWSS within Durgapur (Burdwan North ) Sub Division ,PHE Dte, Under Burdwan Division PHE Dte. | ORD/000934/2024-2025 | 1074/DSD | 10/12/2024 | 45 | BIPLAB SAMANTA | 2.53 | 0.00 | 0 | |||
| 995 | Burdwan Division | Laying of UPVC pipeline in Pallar habitation (Palar Asram Para South side) with Bhatar Zone-I PWSS within Durgapur Sub- Division (Burdwan North) under Burdwan Division PHE Dte. | ORD/000936/2023-2024 | 908/DSD | 15/12/2023 | 45 | TARAMA AGENCY | 0.39 | 0.00 | 100 | |||
| 996 | Burdwan Division | Construction of 1.5 mtrs. Height Boundary Wall along with 750 mm Height 3 layer barbed wire around Other than head work site(ERRUAR4 TH Pump House),Kaluttak under ERUAR PWSS, Bhatar Dev. Block, within Durgapur (Burdwan North) Sub-Division under Burdwan Division, P.H.E. DTE. | ORD/000936/2024-2025 | 1082/DSD | 11/12/2024 | 60 | SWAPAN KUMAR ROY | 3.72 | 0.00 | 0 | |||
| 997 | Burdwan Division | Extension of 63 mm dia UPVC pipeline to provide house connection at different leftout portion of Dirghapara w/s scheme within Kalna Sub-Division under Burdwan Division, PHE Dte.[Sl-E] | ORD/000937/2020-2021 | 171/KSD | 19/02/2021 | 30 | SK RAJU | 1.78 | 0.00 | 1 | |||
| 998 | Burdwan Division | Replacing of existing damaged pipe line at KALUTAK and repairing of 4th Pump house and changing of 2 nos. valve at ERUAR village of ERAUR PWSS of Bhatar Block within Durgapur (Burdwan North) Sub- Division under Burdwan Division PHE Dte. | ORD/000937/2023-2024 | 909/DSD | 15/12/2023 | 45 | SWAPAN KUMAR ROY | 0.93 | 0.00 | 100 | |||
| 999 | Burdwan Division | Water tap connection in each house hold from existing distribution system within Scheme jurisdiction in Parhat (Part-B) village of MAHACHANDA piped W/S Scheme within Durgapur Sub- Division (Burdwan North) under Burdwan Division PHE Dte. | ORD/000938/2023-2024 | 910/DSD | 15/12/2023 | 434 | OM ENTERPRISE | 0.96 | 0.00 | 100 | |||
| 1000 | Burdwan Division | Water tap connection in each house hold from existing distribution system within Scheme jurisdiction in Parhat (Part-A) village of MAHACHANDA piped W/S Scheme within Durgapur Sub- Division (Burdwan North) under Burdwan Division PHE Dte. | ORD/000939/2023-2024 | 911/DSD | 15/12/2023 | 434 | OM ENTERPRISE | 0.95 | 0.00 | 100 | |||
| 1001 | Burdwan Division | Work Order for "Laying of pipeline at gap portion of old and new pipeline of Nandai Piped Water Supply Scheme within Kalna Sub-Division under Burdwan Division , PHE Dte. " | ORD/000947/2023-2024 | 1714/KSD | 04/12/2023 | 7 | ER CONSTRUCTION & GENERAL ORDER SUPPLIER | 0.64 | 0.00 | 100 | |||
| 1002 | Burdwan Division | Restoration of UPVC pipeline which damaged during construction of PCC road & providing FHTC work at DIRGHAPARA Water Supply Scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. | ORD/000949/2023-2024 | 5594/BWD | 20/12/2023 | 30 | UTPAL NANDI | 8.31 | 0.00 | 0 | |||
| 1003 | Burdwan Division | Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Dakshin Mohanpur village (Dakshin Mohanpur Habitation) of Antpara piped water supply scheme within Head Quarters under Burdwan Division, PHE Dte. | ORD/000951/2020-2021 | 4691/BWD | 20/01/2021 | 809 | DIBAKAR SHAW | 4.86 | 0.00 | 100 | |||
| 1004 | Burdwan Division | Work Order for "Laying distribution system including providing FHTC in the leftout portion of Dharmadanga (SM/07545) water supply scheme under Kalna Sub-Division under Burdwan Division, PHE Dte.". | ORD/000953/2024-2025 | 1921/KSD | 02/12/2024 | 30 | H SAMANTA | 2.02 | 0.00 | 0 | |||
| 1005 | Burdwan Division | Construction of wash out & over flow & drain for drain out of over flow water by 250 mm dia UPVC pipeline & soak well along with land development at Zone-I Head work site of surface based water supply scheme within Kalna Sub-Division under Burdwan Division, PHE Dte.[SL-C] | ORD/000960/2020-2021 | 160/KSD | 19/02/2021 | 30 | INVENT ENGINEERS CO. OPERATIVE SOCIETY LTD. | 2.10 | 0.00 | 1 | |||
| 1006 | Burdwan Division | Drinking water supply to 10 Nos ICDS for Uddharanpur water supply scheme Ketugram-II Block under Katwa Sub-Division under Burdwan Division, PHE Dte. | ORD/000961/2020-2021 | 36/KTS | 18/01/2021 | 30 | MAA KHEPIMAYER CHARANE | 4.79 | 0.00 | 1 | |||
| 1007 | Burdwan Division | Retrofitting of RCC Elevated Reservoir (Capacity 300 cum) by shortcreting, Guniting etc. in connection with Augmentation of Bhatar w/s scheme (Zone-I) under Burdwan Division, PHE Dte. | ORD/000963/2020-2021 | 1793./BWD | 26/02/2021 | 45 | LAGNAJITA & CO. | 20.57 | 0.00 | 1 | |||
| 1008 | Burdwan Division | Additional cutting of existing concrete pavement between Node J4 to J51 for laying of 300 mm dia D.I distribution in connection with Laying distribution system of Kayrapur Piped Water Supply Scheme at Ausgram-I Block within Durgapur Sub-Division under Burdwan Division, PHE Dte. (Gr.-C) | ORD/000965/2020-2021 | 109/DSD | 29/01/2021 | 15 | M/S S. CHOUDHURY | 4.05 | 0.00 | 1 | |||
| 1009 | Burdwan Division | Construction of Path Way, Drain, Repairing of Pump House at 2nd TW Site and Providing leftout FHTC, Road Restoration with allied work for TENDUL Piped Water Supply Scheme, Block- Raina-I, within Burdwan Sub Division under Burdwan Division PHE Dte. | ORD/000965/2024-2025 | 4375/BWD | 13/12/2024 | 90 | DEY NIRMAN | 12.69 | 0.00 | 0 | |||
| 1010 | Burdwan Division | Connecting, relaying and repairing of distribution main towards Irkona (Node 4 to Node 18) and Mohora village Node 157 to Node 163 with newly reoriented line (from Chainage 8.40 km to 10.74 km of Galsi Gohogram road and from Node 152 to Node 157 beside PMGSY road) within Adra W/S Scheme at Durgapur Sub-Division in Galsi-II Block under Burdwan Division, P.H.E. Dte. (Gr.-'E') | ORD/000966/2020-2021 | 554/DSD | 22/12/2020 | 21 | PAL CONSTRUCTION | 2.10 | 0.00 | 1 | |||
| 1011 | Burdwan Division | Laying of rising main in between two number of Tube wells to Over Head Reservoir for Kayrapur water supply scheme (Part-A) within Durgapur Sub-Division in Ausgram-I Block under Burdwan Division, PHE Dte. | ORD/000967/2020-2021 | 991/BWD | 04/02/2021 | 30 | M/S S. CHOUDHURY | 7.12 | 0.00 | 1 | |||
| 1012 | Burdwan Division | Providing parallel distribution system from Khargram more to Bhaita High School within PALSIT PWSS, Bardhhaman-II Development Block under Burdwan Division, PHE Dte. | ORD/000968/2023-2024 | 005/BWD | 02/01/2024 | 30 | TARAMA AGENCY | 20.68 | 0.00 | 100 | |||
| 1013 | Burdwan Division | Extension of pipeline for providing functional house hold tap connection at Bhanjapur Mouza within Lohai water supply scheme under Burdwan Division, PHE Dte.[Gr.-D] | ORD/000969/2020-2021 | 1259/AE/HQ | 15/02/2021 | 30 | M/S S. CHOUDHURY | 4.14 | 0.00 | 1 | |||
| 1014 | Burdwan Division | Continuation work order for Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Madhuban village of Dharmadanga Piped Water Supply Scheme within Kalna Sub-Divn. under Burdwan Division, PHE. Dte. [Phase - I] [Sl.No : 6B] | ORD/000972/2020-2021 | 4745/BWD | 01/12/2020 | 30 | KHEPIMA ENGINEERS CO. OPERATIVE SOCIETY LTD. | 2.66 | 0.00 | 1 | |||
| 1015 | Burdwan Division | Construction of 250 cum capacity 20 Mtr staging height RCC Over Head Reservoir including pipe connection and cost of pipes specials including soil investigation for TARAPOSH & its adjoining mouzas water supply scheme under Burdwan Sub-Division, under Burdwan Division, PHE Dte. | ORD/000973/2020-2021 | 4594/BWD | 24/11/2020 | 180 | MITRA CONSTRUCTION | 57.00 | 0.00 | 100 | |||
| 1016 | Burdwan Division | Work Oder for "Laying of Rising Main and alied work such as brick work, P.C.C. work and dismantling work etc. for Manikhar Piped Water Supply Scheme within Kalna Sub-Division under Burdwan Division, PHE Dte." | ORD/000978/2023-2024 | 1706/KSD | 01/12/2023 | 7 | BISWAS ENTERPRISE | 0.51 | 0.00 | 100 | |||
| 1017 | Burdwan Division | Sinking of additional Tube well 250 x 200 mm dia Tube well 150 mtr depth by D.R. Rig method using UPVC pipe (CD) and fibre glass strainer for Hatgobindapur piped water supply scheme (3rd tube well site), Block-Burdwan-II under Burdwan Division, PHE Dte. | ORD/000982/2020-2021 | 1493/BWD | 18/02/2021 | 30 | C.M. ENTERPRISE | 8.68 | 0.00 | 1 | |||
| 1018 | Burdwan Division | Restoration of concrete road by Cement concrete (mix 1:1.5:3), Providing balance FHTC, parallel pipeline, drainage system, boundary wall, Bridge, land development, Sluice valve chamber for smooth water supply of FHTC work for RASULPUR PWSS and its adjoining mouzas within MEMARI-I BLOCK under Burdwan Division, PHE Dte. | ORD/000982/2024-2025 | 4474/BWD | 19/12/2024 | 90 | SARKAR AGENCY | 91.74 | 0.00 | 51 | |||
| 1019 | Burdwan Division | Laying of hume pipe 600 MM dia and laying of 48 mtr 315 mm dia HDPE pipe for widening of NH2 crossing at Budbud more fly over of Mankar Water supply scheme within Galsi -I Block,under Durgapur Sub Division,PHE Dte. | ORD/000987/2023-2024 | 43/DSD | 17/01/2024 | 60 | SOUMYAVASH DAS | 4.77 | 0.00 | 100 | |||
| 1020 | Burdwan Division | Preparation and Submission of DPR for Augmentation of Ground Water Based Piped Water Supply Scheme for NABASTHA, Block:Burdwan-II under Burdwan Division, P.H.E Dte. | ORD/000987/2024-2025 | 1908/BSD | 28/08/2024 | 15 | MEASURE LAND | 0.78 | 0.00 | 0 | |||
| 1021 | Burdwan Division | Construction of boundary wall at 2nd Tube well site of KAYRAPUR Water Supply Scheme (Part-B) and its adjoining mouzas, Block-Ausgram-I, under Burdwan Division P.H.E. Dte. | ORD/000988/2023-2024 | 44/DSD | 17/01/2024 | 30 | SK BADIUZZAMAL | 3.83 | 0.00 | 100 | |||
| 1022 | Burdwan Division | Preparation and Submission of DPR for Augmentation of Ground Water Based Piped Water Supply Scheme for MAHESHDANGA, Block:Memari-I under Burdwan Division, P.H.E Dte. | ORD/000988/2024-2025 | 1909/BSD | 28/08/2024 | 15 | CARTO | 0.00 | 0.00 | 0 | |||
| 1023 | Burdwan Division | Preparation and Submission of DPR for Augmentation of Ground Water Based Piped Water Supply Scheme for GOPIKANTAPUR, Block:Jamalpur under Burdwan Division, P.H.E Dte. | ORD/000989/2024-2025 | 1911/BSD | 28/08/2024 | 15 | MEASURE LAND | 0.78 | 0.00 | 0 | |||
| 1024 | Burdwan Division | Preparation and Submission of DPR for Augmentation of Ground Water Based Piped Water Supply Scheme for MADHANAGAR, Block:Raina-I under Burdwan Division, P.H.E Dte. | ORD/000990/2024-2025 | 1912/BSD | 28/08/2024 | 15 | MEASURE LAND | 0.78 | 0.00 | 0 | |||
| 1025 | Burdwan Division | Rest portion of OHR work (Plastering, Priming & Painting and interconnection of Rising Main with Specials) & Construction of Boundary wall with Smriti Saudha at Aug. of DHARMADANGA Water Supply Scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. (Length - 81.01 Mtr, No of Columns=28 Nos. Centre to Centre- 3.0 Mtr.). | ORD/000995/2023-2024 | 267/BWD | 15/01/2024 | 60 | S.K. CONSTRUCTION | 27.45 | 0.00 | 100 | |||
| 1026 | Burdwan Division | Providing leftout FHTC with extension of Pipeline, construction of Pathway, drain, repairing of Pump House at Head Work site with allied works for NATUNGRAM and KHETIA Piped Water Supply Scheme, Block-Burdwan-I, within Burdwan Sub Division under Burdwan Division PHE Dte. | ORD/001003/2024-2025 | 007/BWD | 02/01/2025 | 211 | M/S UNIQUE | 33.59 | 0.00 | 80 | |||
| 1027 | Burdwan Division | Extension of PVC Water supply line at Koley village for UTTAR RADHAKANTAPUR and its adjoining mouza W/S Scheme Block:Memari-I within Burdwan Sub-Division,PHE Dte. | ORD/001012/2023-2024 | 120/BSD | 18/01/2024 | 30 | A R TRADERS | 0.92 | 0.00 | 98 | |||
| 1028 | Burdwan Division | Construction of Pump House cum switch room (5.40m x 3.60m) with sanitary arrangement (As per drawing no-PHE/SE/CC/PH/ DWG-01/2022-2023) at Aug. of MANTESWAR Water Supply Scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. 1 No Pump House. | ORD/001013/2023-2024 | 467/BWD | 05/02/2024 | 60 | BISHWAJIT DAS | 5.86 | 0.00 | 100 | |||
| 1029 | Burdwan Division | Laying of different dia UPVC pipeline for providing FHTC work at various places under SHURA ZONE- I PWSS, Jamalpur Dev. Block under Burdwan Division, PHE Dte. | ORD/001028/2023-2024 | 97/AE/HQ | 15/02/2024 | 30 | D.M. ENTERPRISE | 0.93 | 0.00 | 100 | |||
| 1030 | Burdwan Division | Construction & Installation of Sluice valve & valve Chamber to control the flow of water under SHURA ZONE-I PWSS, Jamalpur Dev. Block under Burdwan Division, PHE Dte. | ORD/001029/2023-2024 | 98/AE/HQ | 15/02/2024 | 30 | D.M. ENTERPRISE | 0.76 | 0.00 | 100 | |||
| 1031 | Burdwan Division | Additional work for laying of UPVC pipeline for providing FHTC at Srimanpur (Village) (Habitation) under SIPTAI Piped W/S. Scheme, Jamalpur Dev. Block under Burdwan Division, PHE Dte. | ORD/001030/2023-2024 | 99/AE/HQ | 15/02/2024 | 30 | GOUTAM KUMAR MITRA | 0.72 | 0.00 | 100 | |||
| 1032 | Burdwan Division | Land development and Construction of valve chamber by raising of height at 2nd Pumphouse, MAHISHGORIA piped W/S Scheme at Jamalpur Development Block under Burdwan Division, PHE Dte. | ORD/001033/2024-2025 | 85/AE/HQ | 08/01/2025 | 30 | A.R. TRADERS | 0.72 | 0.00 | 0 | |||
| 1033 | Burdwan Division | Land development and Construction of valve chamber by raising of height for control of water flow within command area of MAHISHGORIA H/W Pump house, MAHISHGORIA piped W/S Scheme at Jamalpur Development Block under Burdwan Division, PHE Dte. | ORD/001034/2024-2025 | 86/AE/HQ | 08/01/2025 | 30 | A.R. TRADERS | 0.93 | 0.00 | 0 | |||
| 1034 | Burdwan Division | Construction of Boundary wall at 4th Tubewell site with Inter Connection and providing FHTC at Mirepara, Adampur, Shalmula Village (Habitation) of AJHAPUR Water Supply Scheme under JAMALPUR Block of Burdwan Division, PHE Dte. | ORD/001040/2023-2024 | 783/BWD | 27/02/2024 | 30 | MUNSHI JAVEDUR JAMAN | 14.96 | 0.00 | 100 | |||
| 1035 | Burdwan Division | Sinking of 300 mm X 200 mm dia Tube Well 150 mtr. Depth by D.R. Rig method using UPVC pipe (CM) and UPVC Medium Well Screen (RMS) with construction of Pump House, Boundary wall, Land Development and Rising main connection of NABAGRAM Piped Water Supply Scheme, Block- Jamalpur, District:- Purba-Bardhaman under Burdwan Division PHE Dte. [FOR 3rd. TUBE WELL SITE]. | ORD/001041/2023-2024 | 784/BWD | 27/02/2024 | 490 | ANIRUDDHA FARUQUE | 29.04 | 0.00 | 35 | |||
| 1036 | Burdwan Division | Sinking of 300 mm X 200 mm dia Tube Well 150 mtr. Depth by D.R. Rig method using UPVC pipe (CM) and UPVC Medium Well Screen (RMS) with construction of Pump House, Boundary wall, Land Development and Rising main connection of MASAGRAM (Zone-II) Piped Water Supply Scheme, Block- Jamalpur, District:- Purba-Bardhaman under Burdwan Division PHE Dte. [FOR 3rd. TUBE WELL SITE]. | ORD/001042/2023-2024 | 785/BWD | 27/02/2024 | 187 | SUSUNIA GP CO. OPERATIVE LABOUR CONTRACT AND CONSTRUCTION SOCIETY LTD. | 25.80 | 0.00 | 40 | |||
| 1037 | Burdwan Division | Sinking of 300 mm X 200 mm dia Tube Well 150 mtr. Depth by D.R. Rig method using UPVC pipe (CM) and UPVC Medium Well Screen (RMS) with construction of Pump House & Boundary wall of GOPIKANTAPUR Piped Water Supply Scheme, Block- Jamalpur, District:- Purba-Bardhaman under Burdwan Division PHE Dte. [FOR 3rd. TUBE WELL SITE]. | ORD/001043/2023-2024 | 786/BWD | 27/02/2024 | 440 | BIBHUTI SHAW | 23.90 | 0.00 | 40 | |||
| 1038 | Burdwan Division | Restore of damaged Pipeline at Madanagar Dakshin Para under MADANAGAR Piped Water Supply Scheme, Block- Raina-I within Burdwan Sub Division under Burdwan Division PHE Dte. | ORD/001051/2023-2024 | 823/BWD | 28/02/2024 | 424 | UTPAL NANDI | 6.18 | 0.00 | 100 | |||
| 1039 | Burdwan Division | Sinking of 250 X 150 mm dia Tubewell and Modification to distribution network by making a loop and extension with uPVC pipe to augment the water supply to FHTC at Sunur and Arra village of AMARUN and its adjoining mouzas W/S Scheme (Zone-I) under Durgapur Sub-Division, Burdwan Division, P.H.E. Dte. | ORD/001069/2023-2024 | 1016/BWD | 07/03/2024 | 60 | BAMDEB CONSTRUCTION & CO | 34.03 | 0.00 | 80 | |||
| 1040 | Burdwan Division | Re-Laying of damaged pipeline on distribution system for FHTC work for GHOSH Piped Water Supply Scheme at JOY RAMPUR mouza within MEMARI - I BLOCK under Burdwan Division, PHE Dte. | ORD/001070/2024-2025 | 104/BSD | 16/01/2025 | 30 | N.S. ENTERPRISE | 4.81 | 0.00 | 0 | |||
| 1041 | Burdwan Division | Laying of UPVC (Damaged By Irrigation Department) pipeline at Daspur & Uttar Mohanpur habitation, ANTPARA Piped W/S. Scheme, Jamalpur Dev. Block under Burdwan Division, PHE Dte. | ORD/001071/2023-2024 | 167/AE/HQ | 07/03/2024 | 30 | J.K. CORPORATION | 0.82 | 0.00 | 100 | |||
| 1042 | Burdwan Division | Laying of 150mm DI pipeline for interconnection of 4no tw to distribution line & Kalsi mouza 3rd tw to distribution line for Bagila Piped Water Supply Scheme under memari-I Block, District:- Purba-Bardhaman. | ORD/001071/2024-2025 | 105/BSD | 16/01/2025 | 30 | A.R. TRADERS | 1.88 | 0.00 | 0 | |||
| 1043 | Burdwan Division | Laying UPVC (Damaged By Irrigation Department) pipeline at Uttar Mohanpur habitation, ANTPARA Piped W/S. Scheme, Jamalpur Dev. Block under Burdwan Division, PHE Dte. | ORD/001072/2023-2024 | 168/AE/HQ | 07/03/2024 | 30 | J.K. CORPORATION | 0.92 | 0.00 | 100 | |||
| 1044 | Burdwan Division | Laying of UPVC (Damaged By Irrigation Department) pipeline near Baratikra Bridge including construction of new valve chamber under ANTPARA Piped W/S. Scheme, Jamalpur Dev. Block under Burdwan Division, PHE Dte. | ORD/001073/2023-2024 | 169/AE/HQ | 07/03/2024 | 30 | J.K. CORPORATION | 0.84 | 0.00 | 100 | |||
| 1045 | Burdwan Division | Arrangement of drinking water supply by installation of solar submersible pump including sinking of 200 mm. dia. Tube well 150 Mtr. Deep by direct rotary rig method, Laying dist. System, FHTC and 2 Nos. 5000 Ltr. PVC tank installation with construction of RCC structure for ANTPARA Piped W/S. Scheme, Block Jamalpur under Burdwan Division, PHE Dte. | ORD/001082/2023-2024 | 1085/BWD | 12/03/2024 | 259 | HI-LIGHT ELECTRONICS | 16.31 | 0.00 | 40 | |||
| 1046 | Burdwan Division | Construction of temporary approach road for Boring machine and its accessories at 4th Tube Well site (due to low land) of Balarampur PWSS, Jamalpur Dev. Block Burdwan Sub-Division under Burdwan Division,PHE Dte | ORD/001089/2023-2024 | 519/BSD | 13/03/2024 | 15 | BIBHUTI SHAW | 0.92 | 0.00 | 100 | |||
| 1047 | Burdwan Division | Sinking of additional 300 X 200 mm dia. Tube Well, 420 Mtrs. Depth by D.R. Rig method using UPVC Pipe (CD) and UPVC Deep Well Screen (RDS) for AUGMANTATION of BHATAR & BALGONA Water Supply Scheme within Bhatar Block, Dist.- Purba Bardhaman within Durgapur Sub Division under Burdwan Division PHE Dte. [For 02 Nos. Tube well]. | ORD/001092/2023-2024 | 1125/BWD | 14/03/2024 | 122 | KAR CONSTRUCTION AND ORDER SUPPLIERS | 58.25 | 0.00 | 100 | |||
| 1048 | Burdwan Division | Laying different dia UPVC Pipeline for inter connection of existing FHTC near Kayastyaparan of Abujhati Flyover i.c.w. Road widening from 4 lane to 6 lane of NH-2 at chane 601+9521+960 under ABUIHATI PWSS in jamalpur Block within Burdwan Sub Divn. under Burdwan Division, P.H.E. Dte. | ORD/001093/2023-2024 | 517/BSD | 13/03/2024 | 30 | SOUMYAVASH DAS | 0.89 | 0.00 | 100 | |||
| 1049 | Burdwan Division | Restoration of concrete road by Cement concrete (mix 1:1.5:3), Providing balance FHTC, parallel pipeline, drainage system, boundary wall, Bridge, land development, Sluice valve chamber for smooth water supply of FHTC work for ALIPUR PWSS and its adjoining mouzas within MEMARI-I BLOCK under Burdwan Division, PHE Dte. | ORD/001095/2024-2025 | 430/BWD | 20/01/2025 | 287 | DULAL MAJUMDER | 117.26 | 0.00 | 30 | |||
| 1050 | Burdwan Division | Construction of Boundary wall, Land Development for various PWSS, Block- Jamalpur, District:- Purba-Bardhaman within Burdwan Sub Division under Burdwan Division PHE Dte. | ORD/001100/2024-2025 | 433/BWD | 20/01/2025 | 120 | RABINDRA NATH GORANG | 132.64 | 0.00 | 40 | |||
| 1051 | Burdwan Division | Laying of UPVC pipeline in Katari Habitation within Bhatar Zone- II PWSS WITHIN Durgapur (Burdwan North ) Sub Division ,PHE Dte, Under Burdwan Division PHE Dte. | ORD/001104/2023-2024 | 239/DSD | 12/03/2024 | 30 | BIPLAB SAMANTA | 0.56 | 0.00 | 100 | |||
| 1052 | Burdwan Division | Providing Left Out FHTC to Sansotosh Sayar Par within Bhatar Zone-II PWSS WITHIN Durgapur (Burdwan North ) Sub Division ,PHE Dte, Under Burdwan Division PHE Dte. | ORD/001105/2023-2024 | 240/DSD | 12/03/2024 | 30 | BIPLAB SAMANTA | 0.94 | 0.00 | 100 | |||
| 1053 | Burdwan Division | Providing Left Out FHTC to Area Adjacent to Railway Station within Bhatar Zone-II PWSS WITHIN Durgapur (Burdwan North ) Sub Division ,PHE Dte, Under Burdwan Division PHE Dte. | ORD/001106/2023-2024 | 241/DSD | 12/03/2024 | 30 | BIPLAB SAMANTA | 0.95 | 0.00 | 100 | |||
| 1054 | Burdwan Division | Laying of Parallel Pipeline from Distribution line near Head Work site to Sonadanga to improve water demand at Madubon, Sultanbad & Dhomas village by direct water supply of TENDUL Piped Water Supply Scheme, Raina-I Block under Burdwan Sub Division under Burdwan Division PHE Dte. | ORD/001110/2023-2024 | 1117/BWD | 14/03/2024 | 124 | ANWESHA CONSTRUCTION | 11.70 | 0.00 | 100 | |||
| 1055 | Burdwan Division | Providing FHTC (151 Nos.) of the left out house hold at Ichak habitation including Laying of pipe line from the existing Distribution System within the command area of JAGGESWARDIHI Piped Water Supply Scheme at Mangalkote Block under Katwa Sub-Division under Burdwan Division, PHE Dte. | ORD/001121/2024-2025 | 495/BWD | 28/01/2025 | 30 | ABDUL HAI | 8.30 | 0.00 | 0 | |||
| 1056 | Burdwan Division | Painting & renovation work at Purbasthali raw water pumping station within Kalna Sub-Division under Burdwan Division, PHE Dte. | ORD/001122/2023-2024 | 4560/BWD | 16/10/2023 | 30 | CONCORD ENGINEERING | 6.53 | 0.00 | 100 | |||
| 1057 | Burdwan Division | Re-laying of u-PVC Pipeline damaged by Irrigation department at Sanchra village of Masagram Zone-II Piped W/S Scheme at Jamalpur Development Block under Burdwan Division,PHE Dte | ORD/001130/2023-2024 | 127/BSD | 18/01/2024 | 30 | DHIRENDRANATH SOM | 0.85 | 0.00 | 0 | |||
| 1058 | Burdwan Division | Providing Left Out FHTC to Ashram Paschimpara within Bhatar Zone-I PWSS WITHIN Durgapur (Burdwan North ) Sub Division ,PHE Dte, Under Burdwan Division PHE Dte. | ORD/001165/2023-2024 | 270/DSD | 15/03/2024 | 30 | PAPRI HAZRA | 0.92 | 0.00 | 100 | |||
| 1059 | Burdwan Division | Providing laying distribution pipe line due to shal balla pileing at Sontoshpur village by P.Samiti for SUHARI PWSS at Bardhhaman-II Development Block under Burdwan Division,PHE Dte | ORD/001178/2023-2024 | 537/BSD | 14/03/2024 | 30 | M/S PALASH BISWAS | 0.89 | 0.00 | 100 | |||
| 1060 | Burdwan Division | Providing FHTC with laying of 75 mm dia HDPE Pipe of Putsuri PWSS of Ghosh para village under Manteswar Block under Durgapur Sub Division of Burdwan Division ,P.H.E.Dte | ORD/001182/2023-2024 | 271/DSD | 15/03/2024 | 30 | SAYAK DEY | 0.97 | 0.00 | 100 | |||
| 1061 | Burdwan Division | Providing FHTC with laying of 75 mm dia HDPE Pipe of Putsuri PWSS of near Health Centre under Manteswar Block under Durgapur Sub Division of Burdwan Division ,P.H.E.Dte | ORD/001183/2023-2024 | 272/DSD | 15/03/2024 | 30 | SAYAK DEY | 0.97 | 0.00 | 0 | |||
| 1062 | Burdwan Division | Work Order for "Restoration of 350 mm dia DI Rising Main with other allied works in connection with Augmentation of Nandai (SM/08104) Piped Water Supply Scheme under Kalna Sub-Division under Burdwan Division, PHE Dte." | ORD/001188/2023-2024 | 2192/KSD | 15/03/2024 | 15 | ER CONSTRUCTION & GENERAL ORDER SUPPLIER | 3.30 | 0.00 | 100 | |||
| 1063 | Burdwan Division | Providing Functional Household Tap Connection (FHTC) by sinking of tube well 250 x 150 mm. dia. (2 Nos.) Constn. of Pump House, Boundary Wall and Land Development within command area of BALGANA & BHATAKUL W/S. Scheme, Bhatar Block under Burdwan Division, PHE. Dte. | ORD/001188/2024-2025 | 596/BWD | 07/02/2025 | 120 | M/S S.S. ENTERPRISE | 114.01 | 0.00 | 0 | |||
| 1064 | Burdwan Division | Painting and others ancillary works related to OHR of MAJHERGRAM PWSS under Durgapur Sub Division of MANTESWER Block under Burdwan Division P.H.E.Dte. | ORD/001221/2024-2025 | 728/BWD | 24/02/2025 | 45 | A.R. TRADERS | 7.02 | 0.00 | 0 | |||
| 1065 | Burdwan Division | Construction of overhead structure for placing 2 Nos 5000 lit PVC tank including interconnection, Installation of Solar pump, FHTC, LDS & Sinking of 200 mm dia Tube Well 150 mtr. Depth by D.R. Rig method using UPVC pipe at Mohanpur village for AJHAPUR Piped Water Supply Scheme, Block- Jamalpur, District:- Purba-Bardhaman under Burdwan Division PHE Dte. | ORD/001251/2024-2025 | 817/BWD | 04/03/2025 | 90 | UJJWAL MUKHERJEE | 23.02 | 0.00 | 0 | |||
| 1066 | Burdwan Division | Different Types of work involved in connection with different Augmentation & Retrofitting Schemes (06 Nos.) Piped Water Supply Scheme under Memari II Block within Burdwan Sub-Division under Burdwan Division, PHE Dte. | ORD/001269/2024-2025 | 848/BWD | 05/03/2025 | 120 | PROJECT INDIA | 394.29 | 0.00 | 0 | |||
| 1067 | Burdwan Division | Providing bib cock,stop cock & PVC Pipe for existing FHTC of Shaktigar PWSS under Burdwan Sub Division ,Block:BWN-II under Burdwan Divn,PHE Dte. | ORD/001281/2024-2025 | 504/BSD | 06/03/2025 | 30 | SARKAR AGENCY | 0.94 | 0.00 | 100 | |||
| 1068 | Burdwan Division | Supply of SS316 grade flow control valve for FHTC at different water supply schemes within Kalna Sub-Division under Burdwan Division, PHE Dte. and delivered at Barsul Divisional store.[Part-2] | ORD/001307/2020-2021 | 1792 /BWD | 26/02/2021 | 10 | INDIA PIPE FITTING CO | 9.70 | 0.00 | 1 | |||
| 1069 | Burdwan Division | Sinking of additional tube well 250 x 200 mm dia Tube well 150 mtr depth by D.R. Rig method using upvc pipe (CD) and fibre glass strainer for Bagila piped water supply scheme (2nd tube well site), Block-Memari-I under Burdwan Division, PHE Dte. | ORD/001312/2020-2021 | 1494/BWD | 18/02/2021 | 30 | C.M. ENTERPRISE | 8.68 | 0.00 | 0 | |||
| 1070 | Burdwan Division | Construction of Boundary wall, Land Development work at Head work site, Construction of approach road from main road to OHR of SERUA Piped water supply Scheme, P.H.E Dte. Block:-Bhatar Dist: Purba Bardhaman. | ORD/001341/2024-2025 | 1024/BWD | 21/03/2025 | 90 | KALYAN CHOWDHURY | 18.74 | 0.00 | 50 | |||
| 1071 | Burdwan Division | Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Moyna Habitation of Jougram Piped Water Supply Scheme within Burdwan Sub-Divn. under Burdwan Division, PHE. Dte. [GROUP - 'B'] | ORD/001346/2020-2021 | 2401/BWD | 20/07/2020 | 30 | DEY NIRMAN | 4.92 | 0.00 | 100 | |||
| 1072 | Burdwan Division | Continuation work order for Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Ilsora village and Ilsora habitation of JAUGRAM Piped Water Supply Scheme within Burdwan Sub-Divn. under Burdwan Division, PHE. Dte. [Phase - I] [GROUP : ¿6A¿] | ORD/001347/2020-2021 | 4513/BWD | 12/11/2020 | 30 | MUKHERJEE ENTERPRISE | 4.86 | 0.00 | 100 | |||
| 1073 | Burdwan Division | Restoration and shifting of pipeline, providing sluice valve, Painting and minor repairing of Switch room, Clearing compound premises, making temporary earthen road and repairing of old Valve chamber, Septic tank etc of Serua Piped water supply Scheme , P.H.E Dte. Block:-Bhatar Dist: Purba Bardhaman. | ORD/001417/2024-2025 | 236/DSD | 07/02/2025 | 45 | DHIRENDRANATH SOM | 10.43 | 0.00 | 100 | |||
| 1074 | Burdwan Division | Land demarcation and preparation of sketch map including legal charges for different PWSS under JJM of Bhatar Block under Duragapur (Burdwan North) Sub-Division, P.H.E. DTE. [Part-A] | ORD/001509/2024-2025 | 157/DSD | 27/01/2025 | 180 | SHUBHRA KANTI GHOSH | 0.81 | 0.00 | 70 | |||
| 1075 | Burdwan Division | Material Requisition To Resource Division | RTOR000001/2024-2025 | 4103/BWD | 25/11/2024 | 0 | Resource Division | 54.42 | 0.00 | 0 | |||
| 1076 | Burdwan Division | Material Requisition To Resource Division | RTOR000005/2021-2022 | 3692/BWD | 16/07/2021 | 0 | Resource Division | 12.43 | 0.00 | 0 | |||
| 1077 | Burdwan Division | Material Requisition To Resource Division | RTOR000016/2021-2022 | 6800/BWD | 07/12/2021 | 0 | Resource Division | 2.85 | 0.00 | 0 | |||
| 1078 | Burdwan Division | Material Requisition To Resource Division | RTOR000020/2021-2022 | 421/BWD | 20/01/2022 | 0 | Resource Division | 5.49 | 0.00 | 0 | |||
| 1079 | Burdwan Division | Material Requisition To Resource Division | RTOR000021/2021-2022 | 425/BWD | 20/01/2022 | 0 | Resource Division | 5.50 | 0.00 | 0 | |||
| 1080 | Burdwan Division | Material Requisition To Resource Division | RTOR000022/2021-2022 | 424/BWD | 20/01/2022 | 0 | Resource Division | 5.50 | 0.00 | 0 | |||
| 1081 | Burdwan Division | Material Requisition To Resource Division | RTOR000023/2021-2022 | 423/BWD | 20/01/2022 | 0 | Resource Division | 5.50 | 0.00 | 0 | |||
| 1082 | Burdwan Division | Material Requisition To Resource Division | RTOR000024/2021-2022 | 422/BWD | 20/01/2022 | 0 | Resource Division | 5.49 | 0.00 | 0 | |||
| 1083 | Burdwan Division | Material Requisition To Resource Division | RTOR000054/2022-2023 | 5525/BWD | 23/12/2022 | 0 | Resource Division | 0.62 | 0.00 | 0 | |||
| 1084 | Burdwan Division | Material Requisition To Resource Division | RTOR000055/2022-2023 | 5523/BWD | 23/12/2022 | 0 | Resource Division | 0.62 | 0.00 | 0 | |||
| 1085 | Burdwan Division | Material Requisition To Resource Division | RTOR000115/2021-2022 | 1103/BWD | 26/02/2022 | 0 | Resource Division | 12.30 | 0.00 | 0 | |||
| 1086 | Burdwan Division | Material Requisition To Resource Division | RTOR000116/2021-2022 | 1101/BWD | 26/02/2022 | 0 | Resource Division | 9.23 | 0.00 | 0 | |||
| 1087 | Burdwan Division | Material Requisition To Resource Division | RTOR000117/2021-2022 | 1102/BWD | 26/02/2022 | 0 | Resource Division | 8.61 | 0.00 | 0 | |||
| 1088 | Burdwan Division | Material Requisition To Resource Division | RTOR000119/2021-2022 | 1112/BWD | 26/02/2022 | 0 | Resource Division | 28.05 | 0.00 | 0 | |||
| 1089 | Burdwan Division | Material Requisition To Resource Division | RTOR000120/2021-2022 | 1111/BWD | 26/02/2022 | 0 | Resource Division | 37.62 | 0.00 | 0 | |||
| 1090 | Burdwan Division | Material Requisition To Resource Division | RTOR000121/2021-2022 | 1110/BWD | 26/02/2022 | 0 | Resource Division | 25.78 | 0.00 | 0 | |||
| 1091 | Burdwan Division | Material Requisition To Resource Division | RTOR000122/2021-2022 | 1109/BWD | 26/02/2022 | 0 | Resource Division | 67.99 | 0.00 | 0 | |||
| 1092 | Burdwan Division | Material Requisition To Resource Division | RTOR000123/2021-2022 | 1108/BWD | 26/02/2022 | 0 | Resource Division | 25.78 | 0.00 | 0 | |||
| 1093 | Burdwan Division | Material Requisition To Resource Division | RTOR000124/2021-2022 | 1107/BWD | 26/02/2022 | 0 | Resource Division | 44.82 | 0.00 | 0 | |||
| 1094 | Burdwan Division | Material Requisition To Resource Division | RTOR000125/2021-2022 | 1106/BWD | 26/02/2022 | 0 | Resource Division | 44.82 | 0.00 | 0 | |||
| 1095 | Burdwan Division | Hire & fuel charges of vehicle (Car No.-WB-41H-9788) for the office of the Assistant Head Quarters, Burdwan Division, PHE Dte. for the month of June & July'22. | VCH/000493/2022-2023 | 460/VEH/22-23 | 29/08/2022 | 0 | SK. ASRAFUDDIN | 0.76 | 0.00 | 0 | |||
| 1096 | Burdwan Division | Hire & fuel charges of vehicle (Car No.-WB-41H-3668) for the office of the Assistant Engineer, RWS Burdwan Sub-Division, PHE Dte. for the month of May & June'22. | VCH/000494/2022-2023 | 462/VEH/22-23 | 29/08/2022 | 0 | MD HASIN | 0.51 | 0.00 | 0 | |||
| 1097 | Burdwan Division | Quotation of new connection charges of Chhotobainan water supply scheme under Burdwan Division, PHE Dte. [Application No.-5003481960, Ref ID-503178571], | VCH/000593/2022-2023 | 709/DW/22-23 | 21/10/2022 | 0 | WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LTD. | 3.37 | 0.00 | 0 | |||
| 1098 | Burdwan Division | Quotation for payment of service connection charge on full deposit scheme of Jotraghab w/s scheme. | VCH/000631/2022-2023 | 724/DW/22-23 | 03/11/2022 | 0 | WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LTD. | 1.76 | 0.00 | 0 | |||
| 1099 | Burdwan Division | Quotation for payment of service connection charges for Augmentation of Jotraghab w/s scheme. | VCH/000632/2022-2023 | 725/DW/22-23 | 03/11/2022 | 0 | WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LTD. | 0.33 | 0.00 | 0 | |||
| 1100 | Burdwan Division | Hire & fuel charges of vehicle (Car No.-WB-41H/3668) for the office of the Assistant Engineer, RWS Burdwan Sub-Division, PHE Dte. for the month of July & August'2022. | VCH/000645/2022-2023 | 612/VEH/22-23 | 23/09/2022 | 0 | MD HASIN | 0.56 | 0.00 | 0 | |||
| 1101 | Burdwan Division | Hire & fuel charges of vehicle (Car No.-WB-04G/6018) for the office of the Assistant Engineer, Katwa Sub-Division, PHE Dte. for the month of May & June'2022. | VCH/000646/2022-2023 | 546/VEH/22-23 | 13/09/2022 | 0 | M/S MUNMUN DEY | 0.56 | 0.00 | 0 | |||
| 1102 | Burdwan Division | Supply, delivery & installation of submersible pumping machinery, voltage stabiliser, chlorinator and internal house wiring for Tube well No.-3 of Sudpur water supply scheme under CMD PHE Dte. | VCH/000758/2022-2023 | 788/DW/22-23 | 23/11/2022 | 0 | M.S. ENTERPRISE | 9.43 | 0.00 | 0 | |||
| 1103 | Burdwan Division | Supply of materials for different water supply scheme under Burdwan Division, PHE Dte. | VCH/001013/2021-2022 | 21/01/2022 | 0 | EXECUTIVE ENGINEER, RESOURCES DIVISION, P.H.E. DTE. | 617.98 | 0.00 | 0 | ||||
| Total | 18,238.57 | 3,507.09 | |||||||||||