| Sl No. | Division
Working Divisions
|
Sub Division
Working Divisions
|
Work Name
Name of the Work as per the Issued Work Order
|
Name of AE entrusted | Name of JE entrusted | System Order No.
System Order Number
|
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
|
WO Date
Date of Issuance of Work Order
|
Days of Completion
Target Days for Work Completion as per PHED-MIS
|
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
|
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
|
Payment
Amount of Payment made for this Work Order as per PHED-MIS
|
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
|
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 233 | 2,887.31 | 2,890.57 | |||||||||||
| 1 | RCFA Division -I | Suuply of UPS laboratory antivirus toner 12 for Asansol Laboratory | BILL/00210/2024-2025 | 91/24-25 | 13/06/2024 | 0 | SHARMA ENGINEERING WORKS | 0.08 | 0.00 | 0 | |||
| 2 | RCFA Division -I | Supply of it periphersls under sub district laboratory | BILL/00211/2024-2025 | 92/24-25 | 13/06/2024 | 0 | SHARMA ENGINEERING WORKS | 0.02 | 0.00 | 0 | |||
| 3 | RCFA Division -I | Arrangement of brakfast and lunch box, etc. for DWSM meeting held on 22.06.2024 at ADDA conference hall | BILL/00256/2024-2025 | 121/24-25 | 03/07/2024 | 0 | MUKHERJEE TRADERS | 0.28 | 0.00 | 0 | |||
| 4 | RCFA Division -I | Fuel bill of Ranajit auto against vehicle no WB 37D 0482 for the month of May | BILL/00265/2023-2024 | 116/1/23-24 | 03/07/2023 | 0 | RANAJIT AUTO | 0.23 | 0.00 | 0 | |||
| 5 | RCFA Division -I | Color Xerox repairing and supply of color xerox toner | BILL/00292/2024-2025 | 131/24-25 | 11/07/2024 | 0 | MUKHERJEE TRADERS | 0.17 | 0.00 | 0 | |||
| 6 | RCFA Division -I | BILL/00327/2023-2024 | 149/1/23-24 | 21/07/2023 | 0 | RANAJIT AUTO | 0.17 | 0.00 | 0 | ||||
| 7 | RCFA Division -I | Installation of Jio Fiber connection for Six months under RCFA Division-I PHE Dte. | BILL/00329/2024-2025 | 153/24-25 | 19/07/2024 | 0 | MUKHERJEE TRADERS | 0.07 | 0.00 | 0 | |||
| 8 | RCFA Division -I | Supply of chair for SE/RCFA Circle | BILL/00330/2023-2024 | 151/23-24 | 25/07/2023 | 0 | GLOBAL LOGISTIC CO | 0.23 | 0.00 | 0 | |||
| 9 | RCFA Division -I | Bill for GST Return Oct 2023 to Feb 2024 24 Q 1 & Q 2 2023-2024 and 16 A 26 Q 23-24 | BILL/00348/2024-2025 | 172/24-25 | 25/07/2024 | 0 | SHRESTHA & ASSOCIATES | 0.44 | 0.00 | 0 | |||
| 10 | RCFA Division -I | Arrangement of Stationary items , Flex and Tea snacks for Krmashree meeting held on 12.07.2024 at RTC Hall Asansol | BILL/00358/2024-2025 | 171/24-25 | 26/07/2024 | 0 | BLESSING ENTERPRISE | 0.14 | 0.00 | 0 | |||
| 11 | RCFA Division -I | Fuel and vehicle bill for Feb 2023 to June 23 | BILL/00511/2023-2024 | 234/23-24 | 04/09/2023 | 0 | NIRMALA TRADERS | 1.19 | 0.00 | 0 | |||
| 12 | RCFA Division -I | Car bill may 23 and june 23 | BILL/00518/2023-2024 | 234/2/23-24 | 05/09/2023 | 0 | NIRMALA TRADERS | 0.78 | 0.00 | 0 | |||
| 13 | RCFA Division -I | hirting of maxi cab for date 27.7.2023 to 28.07.2023 us of AE RCFA Div WB37D 9526 | BILL/00532/2023-2024 | 256/23-24 | 11/09/2023 | 0 | NIRMALA TRADERS | 0.06 | 0.00 | 0 | |||
| 14 | RCFA Division -I | April 2023 | BILL/00559/2023-2024 | 77/23-24 | 06/06/2023 | 0 | SHYAMAL MAJI | 0.15 | 0.00 | 0 | |||
| 15 | RCFA Division -I | fuel bill april 2023 shyamal maji | BILL/00560/2023-2024 | 77/1/23-24 | 06/06/2023 | 0 | RANAJIT AUTO | 0.20 | 0.00 | 0 | |||
| 16 | RCFA Division -I | Spiral Binding | BILL/00610/2023-2024 | 185/23-24 | 10/08/2023 | 0 | MUKHERJEE TRADERS | 0.68 | 0.00 | 0 | |||
| 17 | RCFA Division -I | Transporting loading and unloading of jackets Banners etc for pump operator and valve operation at sites under JJM | BILL/00611/2023-2024 | 179/23-24 | 08/08/2023 | 0 | SHARMA ENGINEERING WORKS | 0.18 | 0.00 | 0 | |||
| 18 | RCFA Division -I | hire charges & fuel bill of Ranajit Auto | BILL/00612/2023-2024 | 220/23-24 | 22/08/2023 | 0 | SHYAMAL MAJI | 0.15 | 0.00 | 0 | |||
| 19 | RCFA Division -I | fuel bill shyamal maji jyly 2023 | BILL/00613/2023-2024 | 220/23-24 | 24/08/2023 | 0 | RANAJIT AUTO | 0.16 | 0.00 | 0 | |||
| 20 | RCFA Division -I | Khepi Maa Traders | BILL/00614/2023-2024 | 215/23-24 | 22/08/2023 | 0 | KHEPI MAA TRADERS | 1.16 | 0.00 | 0 | |||
| 21 | RCFA Division -I | Acceptance cum work order for Providing FHTC through Retrofitting at Bhaluka & Sonepur Bazari under Kendra Khottamdih Water Supply Scheme under RCFA Division-I PHE Dte. | BILL/00619/2023-2024 | 204/23-24 | 18/08/2023 | 0 | MACHINO TECHNO | 19.87 | 0.00 | 0 | |||
| 22 | RCFA Division -I | Hire charges and fuel bill 16.05.2023 to 15.08.2023 | BILL/00635/2023-2024 | 264/23-24 | 27/09/2023 | 0 | PRAMIT CHATTERJEE | 1.20 | 0.00 | 0 | |||
| 23 | RCFA Division -I | Hire charges for the month of August 2023 | BILL/00636/2023-2024 | 262/23-24 | 27/09/2023 | 0 | SHYAMAL MAJI | 0.15 | 0.00 | 0 | |||
| 24 | RCFA Division -I | Fuel bill of WB 37D 0482 | BILL/00637/2023-2024 | 263/23-24 | 27/09/2023 | 0 | RANAJIT AUTO | 0.22 | 0.00 | 0 | |||
| 25 | RCFA Division -I | Hire charge and fuel bill for the month of July 2023 to September 2023 | BILL/00754/2023-2024 | 339/23-24 | 17/10/2023 | 0 | SHYAMAL MAJI | 0.15 | 0.00 | 0 | |||
| 26 | RCFA Division -I | Fuel bill for WB37D0482 for the month of Sept 2023 | BILL/00755/2023-2024 | 339/1/23-24 | 17/10/2023 | 0 | RANAJIT AUTO | 0.22 | 0.00 | 0 | |||
| 27 | RCFA Division -I | Hire charges and fuel bill for the month of July 2023 to Sept 2023 | BILL/00756/2023-2024 | 338/23-24 | 17/10/2023 | 0 | NIRMALA TRADERS | 1.20 | 0.00 | 0 | |||
| 28 | RCFA Division -I | Hire charge and fuel bill for the month o June 2023 to August 2023 | BILL/00759/2023-2024 | 323/23-24 | 17/10/2023 | 0 | KHEPI MAA TRADERS | 1.19 | 0.00 | 0 | |||
| 29 | RCFA Division -I | Submissin of quarterly revised return for non salary return Bill no 7236 to 7339 | BILL/00774/2023-2024 | 367/23-24 | 10/11/2023 | 0 | SHRESTHA & ASSOCIATES | 0.36 | 0.00 | 0 | |||
| 30 | RCFA Division -I | Hire charges and fuel bill for Executive Engineer RCFA Division-I PHE Dte | BILL/00823/2023-2024 | 291/23-24 | 10/10/2023 | 0 | NIRMALA TRADERS | 0.06 | 0.00 | 0 | |||
| 31 | RCFA Division -I | Arrangement of breakfast (Tea with snacks) for DWSM meeting held on 27.07.2024 at ADDA Conference hall, Asansol Paschim Bardhaman under RCFA Division-I PHE Dte. | BILL/00935/2024-2025 | 240/24-25 | 23/08/2024 | 0 | BLESSING ENTERPRISE | 0.08 | 0.00 | 0 | |||
| 32 | RCFA Division -I | Arrangeme of tiffin packets for DWSM meeting held on 27.07.2024 at ADDA Conferene hall, Asansol, Paschim Bardhaman | BILL/00936/2024-2025 | 241/24-25 | 23/08/2024 | 0 | BLESSING ENTERPRISE | 0.09 | 0.00 | 0 | |||
| 33 | RCFA Division -I | Installation of quick Heal Anti Viru for 3 years under RCFA Diivison-I PHE Dte. | BILL/00937/2024-2025 | 245/24-25 | 27/08/2024 | 0 | MUKHERJEE TRADERS | 0.09 | 0.00 | 0 | |||
| 34 | RCFA Division -I | Fuel bill in faver of Ranajit auto for the month of October 2024 for one no vechile for office of the deputy superitending enginer RCFA W/S Circle PHE dte govt of west bengal | BILL/00992/2024-2025 | 04/12/2024 | 0 | RANAJIT AUTO | 0.11 | 0.00 | 0 | ||||
| 35 | RCFA Division -I | Acceptance cum work order for Laying of 110 mm dia HDPE Pipe line including concrete cutting mending etc allied works towards Pathakpara (Sansad-XV) Block Andal & Pandabeswar of Improvement of Ukhra Piped Water Supply Scheme under RCFA Division-I PHE Dte. | BILL/01008/2023-2024 | 372/23-24 | 21/11/2023 | 0 | B.T.M. CONCERN | 2.14 | 0.00 | 0 | |||
| 36 | RCFA Division -I | Vehicle bill for 37 D 0482 Oct 2023 and nov 2023 | BILL/01144/2023-2024 | 429/23-24 | 20/12/2023 | 0 | SHYAMAL MAJI | 0.30 | 0.00 | 0 | |||
| 37 | RCFA Division -I | Fuel bill for WB 37 D 0482 for Oct 23 and Nov 23 | BILL/01145/2023-2024 | 430/23-24 | 20/12/2023 | 0 | RANAJIT AUTO | 0.29 | 0.00 | 0 | |||
| 38 | RCFA Division -I | Arrangement of breakfast and lunch box for DWSM meeting held on 13.01.2024 at ADDA Conference hall | BILL/01309/2023-2024 | 494/23-24 | 25/01/2024 | 0 | SHARMA ENGINEERING WORKS | 0.10 | 0.00 | 0 | |||
| 39 | RCFA Division -I | Arrangemen of breakfast and lunch box for DWSM meeting held on 13.01.2024 at ADDA Conferenc hall | BILL/01310/2023-2024 | 495/23-24 | 25/01/2024 | 0 | SHARMA ENGINEERING WORKS | 0.09 | 0.00 | 0 | |||
| 40 | RCFA Division -I | Supply of it peripherals | BILL/01741/2023-2024 | 497/23-24 | 25/01/2024 | 0 | MUKHERJEE TRADERS | 0.43 | 0.00 | 0 | |||
| 41 | RCFA Division -I | Supply of computer desktop | BILL/01742/2023-2024 | 498/23-24 | 25/01/2024 | 0 | MUKHERJEE TRADERS | 0.42 | 0.00 | 0 | |||
| 42 | RCFA Division -I | AMC for xerox machine | BILL/01743/2023-2024 | 455/23-24 | 04/01/2024 | 0 | WORK CHARGE BILL | 0.21 | 0.00 | 0 | |||
| 43 | RCFA Division -I | Repair & maintenance on contract basis of computers and local area network under SERCFA Div-I PHE Dte. | BILL/01745/2023-2024 | 499/23-24 | 01/02/2024 | 0 | KALPANA ENTERPRISE | 0.46 | 0.00 | 0 | |||
| 44 | RCFA Division -I | Hiring charge of Maxi cab (non conditioned) stage II / BS III for ofice use Veh WB 37 D 9526 | BILL/01746/2023-2024 | 553/23-24 | 27/02/2024 | 0 | NIRMALA TRADERS | 0.06 | 0.00 | 0 | |||
| 45 | RCFA Division -I | Hirig of maxi cab state II/BS III for the office use of the Assistant Engineer | BILL/01747/2023-2024 | 554/23-24 | 27/02/2024 | 0 | NIRMALA TRADERS | 0.06 | 0.00 | 0 | |||
| 46 | RCFA Division -I | Hire charges bill for vehicle no WB 37 D0482 for the month of January | BILL/01748/2023-2024 | 570/23-24 | 27/02/2024 | 0 | SHYAMAL MAJI | 0.15 | 0.00 | 0 | |||
| 47 | RCFA Division -I | Fuel bill of Ranajit Auto vehicle no WB 37 D 0482 | BILL/01749/2023-2024 | 571/23-24 | 27/02/2024 | 0 | RANAJIT AUTO | 0.19 | 0.00 | 0 | |||
| 48 | RCFA Division -I | Vehicle bill for the month of Dec 2023 | BILL/01750/2023-2024 | 529/23-24 | 06/02/2024 | 0 | SHYAMAL MAJI | 0.15 | 0.00 | 0 | |||
| 49 | RCFA Division -I | Fuel bill for shyamal Maji for the month of Dec 23 | BILL/01751/2023-2024 | 530/23-24 | 08/02/2024 | 0 | RANAJIT AUTO | 0.17 | 0.00 | 0 | |||
| 50 | RCFA Division -I | Acceptance cum work order Additional work for sinking 3 nos 200 mm dia river bed tube wells and allied repairing work in river Damodar including surging of tube wells at Damalia H/W site under Tirat Mouza W/S Scheme under RCFA Division-I PHE Dte. (Sl No. 11) | ORD/000002/2023-2024 | 1387/RCD-I | 11/04/2023 | 12 | D.S.C. CONCERN | 6.88 | 6.87 | 0 | |||
| 51 | RCFA Division -I | Acceptance cum work order for Emergency supplying aligning and laying of different dia HDPE pipe line for by pass water supply arrangement to Roypara, Singhapara and adjacent areas under Ratibati Water Supply Scheme under RCFA Division-I PHE Dte. | ORD/000007/2022-2023 | 937/RCD-I | 26/04/2022 | 30 | M/S MONDAL ENTERPRISE | 24.23 | 24.17 | 0 | |||
| 52 | RCFA Division -I | Acceptance cum work order for Providing FHTC through Retrofitting at Barabani Zone PWSS, Block- Barabani of Improvement of Barabani Water supply scheme under RCFA Division-I, P.H.E. Dte. [Part-A] | ORD/000013/2021-2022 | 950/RCD-I | 07/06/2021 | 30 | UMA ENTERPRISE | 30.02 | 30.70 | 0 | |||
| 53 | RCFA Division -I | Acceptance cum work order for Providing FHTC through Retrofitting at Chotkara Kanskuli PWSS (Zone-I), Block- Salanpur & Barabani of Chotkara- Kanskuli Water supply scheme under RCFA Division-I, P.H.E. Dte. [Part-A] | ORD/000015/2021-2022 | 952/RCD-I | 07/06/2021 | 30 | DIP CONSTRUCTION | 23.01 | 46.10 | 0 | |||
| 54 | RCFA Division -I | Acceptance cum work order for Providing FHTC through Retrofitting at Chotkara Kanskuli PWSS (Zone-I), Block- Salanpur & Barabani of Chotkara- Kanskuli Water supply scheme under RCFA Division-I, P.H.E. Dte. [Part-B] | ORD/000016/2021-2022 | 953/RCD-I | 07/06/2021 | 30 | TARA MA ENTERPRISE | 23.02 | 45.17 | 0 | |||
| 55 | RCFA Division -I | Acceptance cum work order for Providing FHTC through Retrofitting at Chotkara Kanskuli PWSS (Zone-I), Block- Salanpur & Barabani of Chotkara- Kanskuli Water supply scheme under RCFA Division-I, P.H.E. Dte. [Part-C] | ORD/000017/2021-2022 | 954/RCD-I | 07/06/2021 | 30 | PINKI ENTERPRISE | 23.02 | 39.98 | 0 | |||
| 56 | RCFA Division -I | Acceptance cum work order for Providing FHTC through Retrofitting at Chotkara Kanskuli PWSS (Zone-I), Block- Salanpur & Barabani of Chotkara- Kanskuli Water supply scheme under RCFA Division-I, P.H.E. Dte. [Part-D] | ORD/000018/2021-2022 | 955/RCD-I | 07/06/2021 | 30 | MD AAMIR KHAN | 22.98 | 45.44 | 0 | |||
| 57 | RCFA Division -I | Acceptance cum work order for Providing FHTC through Retrofitting at Chotkara Kanskuli PWSS (Zone-II), Block- Salanpur & Barabani of Chotkara- Kanskuli Water supply scheme under RCFA Division-I, P.H.E. Dte. [Part-A] | ORD/000019/2021-2022 | 956/RCD-I | 07/06/2021 | 30 | SUMIT BANERJEE | 23.02 | 38.36 | 0 | |||
| 58 | RCFA Division -I | Acceptance cum work order for Providing FHTC through Retrofitting at Chotkara Kanskuli PWSS (Zone-II), Block- Salanpur & Barabani of Chotkara- Kanskuli Water supply scheme under RCFA Division-I, P.H.E. Dte. [Part-B] | ORD/000020/2021-2022 | 957/RCD-I | 07/06/2021 | 30 | BABA LOKNATH ENTERPRISE | 23.01 | 43.71 | 0 | |||
| 59 | RCFA Division -I | Acceptance cum work order for Providing FHTC through Retrofitting at Chotkara Kanskuli PWSS (Zone-II), Block- Salanpur & Barabani of Chotkara- Kanskuli Water supply scheme under RCFA Division-I, P.H.E. Dte. [Part-D] | ORD/000021/2021-2022 | 958/RCD-I | 07/06/2021 | 30 | KHEPI MAA TRADERS | 22.98 | 44.52 | 0 | |||
| 60 | RCFA Division -I | Acceptance cum work order for Providing FHTC through Retrofitting at Chotkara Kanskuli PWSS (Zone-III), Block- Salanpur & Barabani of Chotkara- Kanskuli Water supply scheme under RCFA Division-I, P.H.E. Dte. [Part-A] | ORD/000022/2021-2022 | 959/RCD-I | 07/06/2021 | 30 | JAYANTA DATTA | 23.01 | 46.22 | 0 | |||
| 61 | RCFA Division -I | Acceptance cum work order for Providing FHTC through Retrofitting at Chotkara Kanskuli PWSS (Zone-III), Block- Salanpur & Barabani of Chotkara- Kanskuli Water supply scheme under RCFA Division-I, P.H.E. Dte. [Part-B] | ORD/000023/2021-2022 | 960/RCD-I | 07/06/2021 | 30 | M/S MONDAL ENTERPRISE | 23.00 | 40.38 | 0 | |||
| 62 | RCFA Division -I | Acceptance cum work order for Providing FHTC through Retrofitting at Chotkara Kanskuli PWSS (Zone-III), Block- Salanpur & Barabani of Chotkara- Kanskuli Water supply scheme under RCFA Division-I, P.H.E. Dte. [Part-D] | ORD/000024/2021-2022 | 961/RCD-I | 07/06/2021 | 30 | S. CHAKRABORTY & CO. | 22.97 | 45.64 | 0 | |||
| 63 | RCFA Division -I | Acceptance cum work order for Providing FHTC through Retrofitting at Chotkara Kanskuli PWSS (Zone-IV), Block- Salanpur & Barabani of Chotkara- Kanskuli Water supply scheme under RCFA Division-I, P.H.E. Dte. [Part-A] | ORD/000025/2021-2022 | 962/RCD-I | 07/06/2021 | 30 | ASHA CONSTRUCTION | 45.95 | 83.29 | 0 | |||
| 64 | RCFA Division -I | Acceptance cum work order for Providing FHTC through Retrofitting at Chotkara Kanskuli PWSS (Zone-IV), Block- Salanpur & Barabani of Chotkara- Kanskuli Water supply scheme under RCFA Division-I, P.H.E. Dte. [Part-B] | ORD/000026/2021-2022 | 963/RCD-I | 07/06/2021 | 30 | DAS & CHAKRABORTY | 45.92 | 88.99 | 0 | |||
| 65 | RCFA Division -I | Sinking of 4 (Four) nos river bed tube wells including collecting main at Runakuraghat for Flood damaged at river Ajoy under Chotkara Kanskuli water supply scheme under RCFA Division-I PHE Dte. (Sl No. 14) | ORD/000034/2022-2023 | 1093/RCD I | 13/05/2022 | 30 | RELIABLE ENGINEERS CO-OP CONSTRUCTION SOCIETY LTD. | 4.99 | 4.73 | 100 | |||
| 66 | RCFA Division -I | Acceptance cum work order for Providing FHTC through retrofitting at Saheb Bangla & allied areas at Khottamdihi Block Pandabeswar of Kendra Khottamdihi Water Supply Scheme under RCFA Division-I PHE Dte. | ORD/000039/2021-2022 | 978/RCD-I | 17/06/2021 | 1550 | A.K. SIKDAR | 19.13 | 26.36 | 100 | |||
| 67 | RCFA Division -I | Acceptance cum work order for Supply and delivery of C.I. Sluice valve and D.I Specials under Improvement of RCFA part-I Piped water Supply Scheme under RCFA Division-I PHE Dte. | ORD/000055/2023-2024 | 1729/RCD-1 | 08/05/2023 | 10 | SSPR VALVE MANUFACTURING PVT LTD | 45.31 | 45.31 | 100 | |||
| 68 | RCFA Division -I | Acceptance cum work order for Requirement of different type water regulating apparatus including water leakage protection apparatus etc. for Kendra Khottamdihi Water Supply Scheme under RCFA Division-I PHE Dte. | ORD/000056/2023-2024 | 1730/RCD-1 | 08/05/2023 | 10 | MAKALI ENGINEERING CORPORATION | 45.99 | 45.99 | 0 | |||
| 69 | RCFA Division -I | Acceptance cum work order Providing FHTC of retrofitting at Kumardihi village (Left out portion) of kumardiha Mouza, GP-Ratibati, Block Raniganj of Ratibati Water Supply Scheme under RCFA Division-I PHE Dte. (Sl No. 12) | ORD/000057/2023-2024 | 1742/RCD I | 11/05/2023 | 15 | D.S.C. CONCERN | 7.90 | 7.51 | 0 | |||
| 70 | RCFA Division -I | Acceptance cum work order Repairing laying PVC pipe line and allied work at Asansol District Hospital under RCFA Division-I PHE Dte. (Sl. No. 34) | ORD/000060/2023-2024 | 1751/RCD I | 12/05/2023 | 15 | UNITED CONSTRUCTION | 3.23 | 3.23 | 0 | |||
| 71 | RCFA Division -I | Acceptance cum work order for Providing FHTC through Retrofitting at Chotkara Kanskuli PWSS (Zone-II), Block- Salanpur & Barabani of Chotkara- Kanskuli Water supply scheme under RCFA Division-I, P.H.E. Dte. [Part-C] (3rd Call) | ORD/000061/2021-2022 | 1147/RCD-I | 22/07/2021 | 30 | GITASHREE FABRICATION | 21.97 | 21.90 | 0 | |||
| 72 | RCFA Division -I | Acceptance cum work order for Providing FHTC through Retrofitting at Chotkara Kanskuli PWSS (Zone-III), Block- Salanpur & Barabani of Chotkara- Kanskuli Water supply scheme under RCFA Division-I, P.H.E. Dte. [Part-C] (3rd Call) | ORD/000062/2021-2022 | 1148/RCD-I | 22/07/2021 | 30 | GITA CONSTRUCTION | 22.58 | 45.26 | 0 | |||
| 73 | RCFA Division -I | Construction of guard wall on emergency basis near Kalyaneswari I.B. gate under Retrofitting Bahula mouza RCFA Division-I PHE Dte. (Sl No. 12) | ORD/000064/2022-2023 | 1111/RCDI | 13/05/2022 | 30 | R B ENTERPRISE | 4.70 | 4.47 | 100 | |||
| 74 | RCFA Division -I | Emergency basis construction of culvert near Kalyaneswari I.B. gate under Retrofitting Bahula mouza W/S Scheme under RCFA Division-I PHE Dte. (Sl No. 17) | ORD/000069/2022-2023 | 1116/RCDI | 13/05/2022 | 45 | R B ENTERPRISE | 4.93 | 4.92 | 100 | |||
| 75 | RCFA Division -I | Formal Work Order for Pipe line crossing by adopting trench less technology (e.g. Jack Pushing Method etc) near Kanskuli DAM for dedicated pipe line towards Kanskuli village under Chotkara Kanskuli Water Supply Scheme under RCFA Division-I PHE Dte. | ORD/000078/2023-2024 | 1772/RCD-I | 18/05/2023 | 15 | SRI KRISHNA ENTERPRISE | 4.37 | 4.37 | 0 | |||
| 76 | RCFA Division -I | Continuation work order for Providing FHTC through Retrofitting at Salanpur Mouza, Vill-Salanpur, Block-Salanpur of Salanpur Water Supply Scheme under RCFA Division-I PHE Dte. | ORD/000098/2021-2022 | 816/RCD-I | 19/04/2021 | 45 | GITA CONSTRUCTION | 11.84 | 9.17 | 0 | |||
| 77 | RCFA Division -I | Providing FHTC through Retrofitting at Chatadhawra, Booth No. 02, Vill - Kendra, Block - Pandabeswar of Kendra Khottamdih Water Supply Scheme under RCFA Division-I PHE Dte. (Part-B) | ORD/000102/2020-2021 | 1156 /RCD I | 23/12/2020 | 20 | A.K.CONSTRUCTION | 4.43 | 6.18 | 0 | |||
| 78 | RCFA Division -I | Providing FHTC through Retrofitting at Chatadhawra, Booth No. 02, Vill - Kendra, Block - Pandabeswar of Kendra Khottamdih Water Supply Scheme under RCFA Division-I PHE Dte. (Part-C) | ORD/000103/2020-2021 | 1157/RCD I | 23/12/2020 | 20 | DHRUBA ENTERPRISE | 4.45 | 6.13 | 0 | |||
| 79 | RCFA Division -I | Providing FHTC through Retrofitting at Metaldhaora, Booth No. 05, Vill - Kendra, Block - Pandabeswar of Kendra Khottamdih Water Supply Scheme under RCFA Division-I PHE Dte. (Part-A) | ORD/000104/2020-2021 | 1158/RCD I | 23/12/2020 | 20 | M/S MONDAL CONSTRUCTION | 4.44 | 6.17 | 0 | |||
| 80 | RCFA Division -I | Providing FHTC through Retrofitting at Metaldhaora, Booth No. 05, Vill - Kendra, Block - Pandabeswar of Kendra Khottamdih Water Supply Scheme under RCFA Division-I PHE Dte. (Part-B) | ORD/000105/2020-2021 | 1159/RCD I | 23/12/2020 | 20 | VISUVIOUS | 4.47 | 6.17 | 0 | |||
| 81 | RCFA Division -I | Providing FHTC through Retrofitting at Metaldhaora, Booth No. 05, Vill - Kendra, Block - Pandabeswar of Kendra Khottamdih Water Supply Scheme under RCFA Division-I PHE Dte. (Part-C) | ORD/000106/2020-2021 | 1160/RCD I | 23/12/2020 | 20 | MS KALYAN ENTERPRISE | 4.45 | 6.37 | 0 | |||
| 82 | RCFA Division -I | Acceptance cum Work Order for Providing FHTC through Retrofitting at Chelod Mouza, G.P.-Tirat, Block-Raniganj of Ratibati Water Supply Scheme under RCFA Division-I PHE Dte. (Sl No. 01) | ORD/000108/2020-2021 | 1167/RCD-I | 23/12/2020 | 30 | MRITYUNJOY MUKHERJEE & CO. | 37.97 | 31.34 | 0 | |||
| 83 | RCFA Division -I | Acceptance cum work order for Providing FHTC through Retrofitting at Chapui (CT) Mouza, G.P.-Ratibati, Block-Raniganj of Ratibati Water Supply Scheme under RCFA Division-I PHE Dte. (Sl No. 02) | ORD/000110/2020-2021 | 1185/RCD-I | 24/12/2020 | 30 | SWATI CORPORATION | 39.19 | 58.25 | 0 | |||
| 84 | RCFA Division -I | Acceptance cum Work Order for Providing FHTC through Retrofitting at Kumardiha Mouza, G.P.-Ratibati, Block-Raniganj of Ratibati Water Supply Scheme under RCFA Division-I PHE Dte. (Sl No. 03) | ORD/000111/2020-2021 | 1186/RCD-I | 24/12/2020 | 30 | M/S B.K. CONSTRUCTION | 19.63 | 35.64 | 0 | |||
| 85 | RCFA Division -I | Acceptance cum work order for Providing FHTC through Retrofitting at Seora Mouza, G.P.- Ratibati, Block- Raniganj of Ratibati Water supply scheme under RCFA Division-I, P.H.E. Dte. (Sl No. 05) | ORD/000112/2020-2021 | 1187/RCD-I | 24/12/2020 | 30 | A. CONSTRUCTION CO. | 20.48 | 39.53 | 0 | |||
| 86 | RCFA Division -I | Acceptance cum work order for Providing FHTC through Retrofitting at Ratibati (Part-II), G.P.- Ratibati, Block- Raniganj of Ratibati Water supply scheme under RCFA Division-I, P.H.E. Dte. (Sl No. 06) | ORD/000113/2020-2021 | 1188/RCD-I | 24/12/2020 | 30 | SOMNATH SAMANTA | 22.88 | 40.00 | 0 | |||
| 87 | RCFA Division -I | Acceptance cum work order for Providing FHTC through Retrofitting at ECL 2 Nos Colliery area, Vill - Kendra, Block - Pandabeswar of Kendra Khottamdih Water Supply Scheme under RCFA Division-I PHE Dte. (Sl No. 01) | ORD/000114/2020-2021 | 1189/RCD-I | 24/12/2020 | 30 | GITASHREE FABRICATION | 12.68 | 19.38 | 0 | |||
| 88 | RCFA Division -I | Acceptance cum work order for Providing FHTC through Retrofitting at Mines Quarter Booth No. 3, Vill - Kendra, Block - Pandabeswar of Kendra Khottamdih Water Supply Scheme under RCFA Division-I PHE Dte. (Sl No. 02) | ORD/000115/2020-2021 | 1190/RCD-I | 24/12/2020 | 30 | SIMA ENTERPRISE | 9.93 | 12.38 | 0 | |||
| 89 | RCFA Division -I | Acceptance cum work order for Providing FHTC through Retrofitting at Khottamdih Village, Vill - Kendra, Block - Pandabeswar of Kendra Khottamdih Water Supply Scheme under RCFA Division-I PHE Dte. (Sl No. 04) | ORD/000117/2020-2021 | 1192/RCD-I | 24/12/2020 | 30 | M/S MONI TRADERS | 14.10 | 19.45 | 0 | |||
| 90 | RCFA Division -I | Acceptance cum work order for Providing FHTC through Retrofitting at ECL 3 Nos Colliery area, Vill - Kendra, Block - Pandabeswar of Kendra Khottamdih Water Supply Scheme under RCFA Division-I PHE Dte. (Sl No. 05) | ORD/000118/2020-2021 | 1193/RCD-I | 24/12/2020 | 30 | RELIABLE ENGINEERS CO-OP CONSTRUCTION SOCIETY LTD. | 16.09 | 22.77 | 0 | |||
| 91 | RCFA Division -I | Acceptance cum work order for Providing FHTC through Retrofitting at Kendra Mouza, Booth No. 1 (Kendra Gram), Vill - Kendra, Block - Pandabeswar of Kendra Khottamdih Water Supply Scheme under RCFA Division-I PHE Dte. (Part-A) (Sl No. 06) | ORD/000119/2020-2021 | 1194/RCD-I | 24/12/2020 | 30 | DURGADAS MONDAL | 9.08 | 10.62 | 0 | |||
| 92 | RCFA Division -I | Providing FHTC through Retrofitting at Chatadhawra, Booth No. 02, Vill - Kendra, Block - Pandabeswar of Kendra Khottamdih Water Supply Scheme under RCFA Division-I PHE Dte. (Part-A) | ORD/000122/2020-2021 | 1155/RCD I | 23/12/2020 | 20 | ZEROTH CONTROL SYSTEM | 4.40 | 5.68 | 0 | |||
| 93 | RCFA Division -I | Extension of different dia HDPE pipe line for providing FHTC at Parulberia and allied villages (Part-B) under Roshna W/S Scheme under RCFA Division-I PHE Dte. | ORD/000138/2022-2023 | 1432/RCD I | 27/06/2022 | 45 | MD SARFARAZ ALAM | 4.98 | 4.65 | 0 | |||
| 94 | RCFA Division -I | Supplying, aligning & Laying of different dia HDPE pipe line for providing FHTC to Manahora, Kanskuli (Part) and Kalisanko villages under Chotkara Kanskuli W/S Scheme under RCFA Division-I PHE Dte. (Sl No. 02) | ORD/000139/2022-2023 | 1433/RCD I | 27/06/2022 | 45 | GITASREE FABRICATION | 1.97 | 1.76 | 0 | |||
| 95 | RCFA Division -I | Supplying, aligning & Laying of different dia HDPE pipe line for providing FHTC at Parulberia and allied villages (Part-A) under Roshna W/S Scheme under RCFA Division-I PHE Dte. (Sl No. 03) | ORD/000140/2022-2023 | 1434/RCD I | 27/06/2022 | 45 | MD AAMIR KHAN | 5.00 | 4.00 | 0 | |||
| 96 | RCFA Division -I | Extension of different dia HDPE pipe line for providing FHTC at Gourbazar, Bindudihi, Hosenpara villages under Gourbazar W/S Scheme under RCFA Division-I PHE Dte. (Sl NO. 05) | ORD/000142/2022-2023 | 1436/RCD I | 27/06/2022 | 45 | M/S S.K. ENTERPRISE | 4.97 | 4.48 | 0 | |||
| 97 | RCFA Division -I | Extension of different dia HDPE pipe line for providing FHTC at Roshna & Baspahari villages under Roshna W/S Scheme under RCFA Division-I PHE Dte. (Sl No. 07) | ORD/000144/2022-2023 | 1438/RCD I | 27/06/2022 | 45 | SHREE DURGA ENTERPRISE | 3.22 | 3.10 | 0 | |||
| 98 | RCFA Division -I | Laying of HDPE pipe line and other repairing work of distribution at Ratibati Water Supply Scheme under RCFA Division-I PHE Dte. (Sl No. 15) | ORD/000152/2022-2023 | 1446/RCD I | 27/06/2022 | 45 | M/S MONDAL ENTERPRISE | 2.54 | 2.49 | 0 | |||
| 99 | RCFA Division -I | Acceptance cum work order for Supplying, aligning and laying of DI & HDPE pipe line for water supply arrangement to Kumardiha village under Ratibati W/S Scheme under RCFA Division-I PHE Dte. | ORD/000156/2021-2022 | 1584/RCD-I | 07/09/2021 | 30 | M/S MONDAL ENTERPRISE | 20.03 | 19.90 | 0 | |||
| 100 | RCFA Division -I | Acceptance cum work order for Laying of different dia UPVC/HDPE pipe line for extension of distribution system regarding FHTC work at Kumardiha mouza of Ratibati water supply scheme under RCFA Div-I PHE Dte. | ORD/000160/2021-2022 | 1585/RCD-I | 07/09/2021 | 30 | M/S B.K. CONSTRUCTION | 14.42 | 13.73 | 0 | |||
| 101 | RCFA Division -I | Acceptance cum work order for Additional work of Morum cutting, concrete cutting, Hard rock cutting, Bituminus Road cutting different dia DI (K-7) & HDPE pipe line with other allied works from Dabor OHR Zone-II (Pahargara, Mohanpur, Partabpur, Bolkundi etc) distribution under Retrofitting Chotkara-Kanskuli W/S Scheme Zone II under RCFA Division-I PHE Dte. | ORD/000161/2021-2022 | 1586/RCD-I | 07/09/2021 | 30 | DAS & CHAKRABORTY | 11.29 | 10.88 | 0 | |||
| 102 | RCFA Division -I | Acceptance cum work order for Providing FHTC through Retrofitting at Daskeary Village Block-Barabani under Roshna Water supply scheme under RCFA Division-I, P.H.E. Dte. | ORD/000188/2021-2022 | 1862/RCD-I | 28/10/2021 | 30 | M/S MONI TRADERS | 39.47 | 35.31 | 0 | |||
| 103 | RCFA Division -I | Acceptance cum work order for Providing FHTC through Retrofitting at Roshna (Part) Block-Barabani under Roshna Water supply scheme under RCFA Division-I, P.H.E. Dte. | ORD/000189/2021-2022 | 1863/RCD-I | 28/10/2021 | 30 | SRI KRISHNA ENTERPRISE | 12.81 | 9.39 | 0 | |||
| 104 | RCFA Division -I | Acceptance cum work order for Providing FHTC through Retrofitting at Parulberia Mouza Block-Barabani under Roshna Water supply scheme under RCFA Division-I, P.H.E. Dte. | ORD/000190/2021-2022 | 1864/RCD-I | 28/10/2021 | 30 | MAK CONSTRUCTION CO. | 20.28 | 17.74 | 0 | |||
| 105 | RCFA Division -I | Acceptance cum work order for Providing FHTC through Retrofitting at Gourbazar Village, Block-Barabani under Gourbazar Water supply scheme under RCFA Division-I, P.H.E. Dte. | ORD/000191/2021-2022 | 1865/RCD-I | 28/10/2021 | 30 | M/S S.K. ENTERPRISE | 13.17 | 12.21 | 0 | |||
| 106 | RCFA Division -I | Acceptance cum work order for Providing FHTC through Retrofitting at Putulia (Part), Block-Barabani under Gourbazar Water supply scheme under RCFA Division-I, P.H.E. Dte. | ORD/000192/2021-2022 | 1866/RCD-I | 28/10/2021 | 30 | VISUVIOUS | 12.85 | 10.95 | 0 | |||
| 107 | RCFA Division -I | Hiring of Maxi Cab (Non Air-conditioned)(Bharat stage-III/BS-III purchased on or after 01.05.2008 with Diesel/LPG/CNG Engine. as when required basis for supervision of FHTC related works under JJM) of RCFA Div-I, PHE Dte Govt, of West Bengal (w.e.f 16.08.2022 to 15.08.2023) | ORD/000204/2022-2023 | 1907/RCDI | 12/08/2022 | 12 | PRAMIT CHATTERJEE | 1.80 | 0.79 | 0 | |||
| 108 | RCFA Division -I | Supply of 10 mm into female 15 mm outer male reducer Brass Bush at Searsole Store to provide interconnection work in between maniflod and ferrule under Ukhra Water Supply Scheme under RCFA Division-I PHE Dte. (Sl No. 02) | ORD/000208/2022-2023 | 1909/RCD-I | 12/08/2022 | 7 | SNEHA ELECTRIC | 4.69 | 4.69 | 0 | |||
| 109 | RCFA Division -I | Emergency for providing balance FHTC through retrofitting at Shamdi G.P. area and Chayanpur and adjacent villages under Chotkara Kanskuli W/S Scheme under RCFA Division-I PHE Dte.(Sl no 03) | ORD/000211/2022-2023 | 1980/RCD I | 24/08/2022 | 15 | KHEPI MAA TRADERS | 4.54 | 4.04 | 0 | |||
| 110 | RCFA Division -I | Providing FHTC through Retrofitting at Salanpur Mouza, Vill-Salanpur, Block-Salanpur of Salanpur Water Supply Scheme under RCFA Division-I PHE Dte. | ORD/000215/2020-2021 | 432 /RCD-I | 04/03/2021 | 45 | GITA CONSTRUCTION | 46.13 | 75.61 | 0 | |||
| 111 | RCFA Division -I | Acceptance cum work order for Providing FHTC through Retrofitting at Maira area Dakshin Khnada (Jl No. 36) Block ¿ Andal of RCFA Part-II W/S Scheme under RCFA Division-I PHE Dte. | ORD/000246/2022-2023 | 2212/RCD-I | 14/09/2022 | 30 | UNITED CONSTRUCTION | 44.65 | 9.74 | 0 | |||
| 112 | RCFA Division -I | Acceptance cum work order for Providing FHTC through Retrofitting at Subhas Para & Chunari Para (Sansad-III) Block-Andal & Pandabeswar of Ukhra Water Supply Scheme under RCFA Division-I PHE Dte. | ORD/000258/2021-2022 | 1867/RCD-I | 28/10/2021 | 30 | DAS & CHAKRABORTY | 18.10 | 18.09 | 0 | |||
| 113 | RCFA Division -I | Acceptance cum work order for Providing FHTC through Retrofitting at Hanuman Danga & Saradapally (Sansad-IV) Block-Andal & Pandabeswar of Ukhra Water Supply Scheme under RCFA Division-I PHE Dte. | ORD/000259/2021-2022 | 1868/RCD-I | 28/10/2021 | 30 | DAWN CONSTRUCTION | 26.54 | 26.54 | 0 | |||
| 114 | RCFA Division -I | Acceptance cum work order for Providing FHTC through Retrofitting at Ukhra Bazar Area (Sansad-V) Block-Andal & Pandabeswar of Ukhra Water Supply Scheme under RCFA Division-I PHE Dte. | ORD/000260/2021-2022 | 1869/RCD-I | 28/10/2021 | 30 | UMA ENTERPRISE | 21.30 | 21.30 | 0 | |||
| 115 | RCFA Division -I | Acceptance cum work order for Providing FHTC through Retrofitting at Suri Para, Bisakhalakhi Tala (Sansad-VI) Block-Andal & Pandabeswar of Ukhra Water Supply Scheme under RCFA Division-I PHE Dte. | ORD/000261/2021-2022 | 1870/RCD-I | 28/10/2021 | 30 | JAYANTA DATTA | 18.06 | 18.06 | 0 | |||
| 116 | RCFA Division -I | Acceptance cum work order for Providing FHTC through Retrofitting at Puratan Mushlim Para & Dhibarpara (Sansad-VII) Block-Andal & Pandabeswar of Ukhra Water Supply Scheme under RCFA Division-I PHE Dte. | ORD/000262/2021-2022 | 1871/RCD-I | 28/10/2021 | 30 | RUBY CONSTRUCTION | 15.67 | 15.67 | 0 | |||
| 117 | RCFA Division -I | Acceptance cum work order for Providing FHTC through Retrofitting at Kankardanga (Sansad-VIII) Block-Andal & Pandabeswar of Ukhra Water Supply Scheme under RCFA Division-I PHE Dte. | ORD/000263/2021-2022 | 1872/RCD-I | 28/10/2021 | 30 | MS KALYAN ENTERPRISE | 10.60 | 10.60 | 0 | |||
| 118 | RCFA Division -I | Acceptance cum work order for Providing FHTC through Retrofitting at Dangal Para (Sansad-XI) Block-Andal & Pandabeswar of Ukhra Water Supply Scheme under RCFA Division-I PHE Dte. | ORD/000264/2021-2022 | 1873/RCD-I | 28/10/2021 | 30 | SNEHA ELECTRIC | 13.31 | 13.30 | 0 | |||
| 119 | RCFA Division -I | Acceptance cum work order for Providing FHTC through Retrofitting at Mulimpara & Ruidaspara (Sansad-XIII) Block-Andal & Pandabeswar of Ukhra Water Supply Scheme under RCFA Division-I PHE Dte. | ORD/000265/2021-2022 | 1874/RCD-I | 28/10/2021 | 30 | MD. JAWED KHAN | 18.16 | 18.15 | 0 | |||
| 120 | RCFA Division -I | Acceptance cum work order for Providing FHTC through Retrofitting at Asthalpara (Sansad-XIV) Block-Andal & Pandabeswar of Ukhra Water Supply Scheme under RCFA Division-I PHE Dte. | ORD/000266/2021-2022 | 1875/RCD-I | 28/10/2021 | 30 | UNITED CONSTRUCTION | 13.32 | 13.32 | 0 | |||
| 121 | RCFA Division -I | Acceptance cum work order for Providing FHTC through Retrofitting at Pathakpara (Sansad-XV) Block-Andal & Pandabeswar of Ukhra Water Supply Scheme under RCFA Division-I PHE Dte. | ORD/000267/2021-2022 | 1876/RCD-I | 28/10/2021 | 30 | B.T.M CONCERN | 15.25 | 15.25 | 0 | |||
| 122 | RCFA Division -I | Acceptance cum work order for Providing FHTC through Retrofitting at Mukherjeepara & Khad Para (Sansad-XVII) Block-Andal & Pandabeswar of Ukhra Water Supply Scheme under RCFA Division-I PHE Dte. | ORD/000268/2021-2022 | 1877/RCD-I | 28/10/2021 | 30 | SIMA ENTERPRISE | 15.72 | 15.71 | 0 | |||
| 123 | RCFA Division -I | Acceptance cum work order for Providing FHTC through Retrofitting at Teli Para (Sansad-XVIII) Block-Andal & Pandabeswar of Ukhra Water Supply Scheme under RCFA Division-I PHE Dte. | ORD/000269/2021-2022 | 1878/RCD-I | 28/10/2021 | 30 | M/S K & KONAR CONSTRUCTION | 17.13 | 17.12 | 0 | |||
| 124 | RCFA Division -I | Acceptance cum work order for Providing FHTC through Retrofitting at Sukho Para (Sansad-XX) Block-Andal & Pandabeswar of Ukhra Water Supply Scheme under RCFA Division-I PHE Dte. | ORD/000270/2021-2022 | 1879/RCD-I | 28/10/2021 | 30 | SOMNATH SAMANTA | 15.63 | 15.63 | 0 | |||
| 125 | RCFA Division -I | Acceptance cum work order for Providing FHTC through Retrofitting at Guzarbagh (Sansad-XXI) Block-Andal & Pandabeswar of Ukhra Water Supply Scheme under RCFA Division-I PHE Dte. | ORD/000271/2021-2022 | 1880/RCD-I | 28/10/2021 | 30 | R B ENTERPRISE | 13.30 | 13.30 | 0 | |||
| 126 | RCFA Division -I | Acceptance cum work order for Providing FHTC through Retrofitting at Safique Nagar (Sansad-XXII) Block-Andal & Pandabeswar of Ukhra Water Supply Scheme under RCFA Division-I PHE Dte. | ORD/000272/2021-2022 | 1881/RCD-I | 28/10/2021 | 30 | A. CONSTRUCTION CO. | 18.11 | 18.11 | 0 | |||
| 127 | RCFA Division -I | Sinking of 3 (Three) nos 200 mm dia River Bed Tube Wells including repairing work of 100 mm dia Collecting Mains which were damaged due to flood in the month of July - August & etc. allied works at River Damodar under Ratibati Water Supply Scheme under RCFA Div-I PHE Dte. (sl no 05) | ORD/000278/2021-2022 | 1937/RCD I | 09/11/2021 | 20 | M/S PIONEER CONSTRUCTION | 3.17 | 2.92 | 0 | |||
| 128 | RCFA Division -I | Acceptance cum work order for Additional Providing FHTC of retrofitting at Kumardiha village (left out portion) of Kumardiha Mouza, Retrofitting of Madantore PWSS for providing FHTC under RCFA Division-I PHE Dte. | ORD/000281/2024-2025 | 2619/RCD-I | 14/11/2024 | 20 | D.S.C. CONCERN | 6.57 | 0.00 | 0 | |||
| 129 | RCFA Division -I | Acceptance cum work order for Supplying, laying and aligning distribution branch main from distribution main including providing FHTC work at Bilpahari Bauri Para (Re-habilitated village) under Kendra Khottamdihi Water Supply Scheme under RCFA Division-I PHE Dte. | ORD/000294/2021-2022 | 2026/RCD-I | 24/11/2021 | 30 | RANJIB GHATAK | 26.95 | 22.70 | 0 | |||
| 130 | RCFA Division -I | Acceptance cum work order for Supplying, laying and aligning distribution branch main from distribution main including providing FHTC work at Bilpahari General Para (Re-habilitated village) under Kendra Khottamdihi Water Supply Scheme under RCFA Division-I PHE Dte. | ORD/000295/2021-2022 | 2027/RCD-I | 24/11/2021 | 30 | SWATI CORPORATION | 39.08 | 31.16 | 0 | |||
| 131 | RCFA Division -I | Acceptance cum work order for Supply and laying of 16 sqmm x 4 core Al armored PVC power cable and 10 HP Submersible Pump at Ratibati river bed pump house site damaged due to spreading of fire of Ratibati Water Supply Scheme under RCFA Division-I PHE Dte. | ORD/000298/2021-2022 | 2030/RCD-I | 24/11/2021 | 10 | M/S PIONEER CONSTRUCTION | 11.72 | 11.72 | 0 | |||
| 132 | RCFA Division -I | Acceptance cum work order for Providing FHTC through Retrofitting at Dakshin Khanda (Jl No. 36) Block ¿ Andal of RCFA Part-II W/S Scheme under RCFA Division-I PHE Dte. (Part ¿ A) | ORD/000299/2021-2022 | 2124/RCD-I | 29/11/2021 | 30 | A.K.CONSTRUCTION | 14.40 | 14.40 | 0 | |||
| 133 | RCFA Division -I | Acceptance cum work order for Providing FHTC through Retrofitting at Dakshin Khanda (Jl No. 36) Block ¿ Andal of RCFA Part-II W/S Scheme under RCFA Division-I PHE Dte. (Part ¿ B) | ORD/000300/2021-2022 | 2125/RCD-I | 29/11/2021 | 30 | UNITED CONSTRUCTION | 14.36 | 14.36 | 0 | |||
| 134 | RCFA Division -I | Acceptance cum work order for Providing FHTC through Retrofitting at Dakshin Khanda (Jl No. 36) Block ¿ Andal of RCFA Part-II W/S Scheme under RCFA Division-I PHE Dte. (Part ¿ C) | ORD/000301/2021-2022 | 2126/RCD-I | 29/11/2021 | 30 | DURGADAS MONDAL | 14.37 | 14.26 | 0 | |||
| 135 | RCFA Division -I | Acceptance cum work order for Providing FHTC through Retrofitting at Dakshin Khanda (Jl No. 36) Block ¿ Andal of RCFA Part-II W/S Scheme under RCFA Division-I PHE Dte. (Part ¿ D) | ORD/000302/2021-2022 | 2127/RCD-I | 29/11/2021 | 30 | SIMA ENTERPRISE | 14.42 | 14.42 | 0 | |||
| 136 | RCFA Division -I | Acceptance cum work for Providing FHTC through Retrofitting at Dakshin Khanda (Jl No. 36) Block ¿ Andal of RCFA Part-II W/S Scheme under RCFA Division-I PHE Dte. (Part ¿ E) | ORD/000303/2021-2022 | 2128/RCD-I | 29/11/2021 | 30 | M/S KALYANI ENTERPRISE | 14.45 | 14.44 | 0 | |||
| 137 | RCFA Division -I | Acceptance cum work order for Providing FHTC through Retrofitting at Dakshin Khanda (Jl No. 36) Block ¿ Andal of RCFA Part-II W/S Scheme under RCFA Division-I PHE Dte. (Part ¿ F) | ORD/000304/2021-2022 | 2129/RCD-I | 29/11/2021 | 30 | M/S SUBHRADEEP | 16.51 | 16.51 | 0 | |||
| 138 | RCFA Division -I | Acceptance cum work order for Providing FHTC through Retrofitting at Khandra CT (Jl No. 32) Block ¿ Andal of RCFA Part-II W/S Scheme under RCFA Division-I PHE Dte. (Part ¿ B1) | ORD/000305/2021-2022 | 2130/RCD-I | 29/11/2021 | 30 | D.S. ENTERPRISE | 18.12 | 12.86 | 0 | |||
| 139 | RCFA Division -I | Acceptance cum work order for Providing FHTC through Retrofitting at Khandra CT (Jl No. 32) Block ¿ Andal of RCFA Part-II W/S Scheme under RCFA Division-I PHE Dte. (Part ¿ B2) | ORD/000306/2021-2022 | 2131/RCD-I | 29/11/2021 | 30 | M/S B.K. CONSTRUCTION | 18.13 | 18.13 | 0 | |||
| 140 | RCFA Division -I | Acceptance cum work order for Providing FHTC through Retrofitting at Khandra CT (Jl No. 32) Block ¿ Andal of RCFA Part-II W/S Scheme under RCFA Division-I PHE Dte. (Part ¿ C1) | ORD/000307/2021-2022 | 2132/RCD-I | 29/11/2021 | 30 | KHEPI MAA TRADERS | 17.52 | 17.52 | 0 | |||
| 141 | RCFA Division -I | Acceptance cum work order for Providing FHTC through Retrofitting at Khandra CT (Jl No. 32) Block ¿ Pandabeswar of RCFA Part-II W/S Scheme under RCFA Division-I PHE Dte. (Part ¿ C2) | ORD/000308/2021-2022 | 2133/RCD-I | 29/11/2021 | 30 | MRITYUNJOY MUKHERJEE & CO. | 18.70 | 12.53 | 0 | |||
| 142 | RCFA Division -I | Annual Maintenance Contract (AMC) for Computers, Prnters, UPS & other related peripherals installed at office chamber of the Assistant Engineer, Junior Engineers, DPMU, IEC under of the Executive Engineer, RCFA Division-I PHE Dte. (Period from 01.07.2023 to 31.12.2023) | ORD/000308/2023-2024 | 2039/RCD-I | 30/06/2023 | 184 | SHARMA ENGINEERING WORKS | 0.90 | 0.90 | 100 | |||
| 143 | RCFA Division -I | Formal work order for Providing FHTC through Retrofitting at Bahula (CT) (JL no. 30, Block - Pandabeswar) of RCFA Pt-II W/S Scheme under RCFA Division-I, PHE Dte. (Part-A) | ORD/000316/2021-2022 | 2143/RCD-I | 29/11/2021 | 120 | GITA CONSTRUCTION | 81.14 | 61.82 | 0 | |||
| 144 | RCFA Division -I | Formal work order for Providing FHTC through Retrofitting at Bahula (CT) (JL no. 30, Block - Pandabeswar) of RCFA Pt-II W/S Scheme under RCFA Division-I, PHE Dte. (Part-B) | ORD/000317/2021-2022 | 2144/RCD-I | 29/11/2021 | 120 | MD AAMIR KHAN | 81.00 | 59.89 | 0 | |||
| 145 | RCFA Division -I | Formal work order for Providing FHTC through Retrofitting at Khandra (CT) (JL no. 32, Block - Andal) of RCFA Pt-II W/S Scheme under RCFA Division-I, PHE Dte. (Part-A) | ORD/000318/2021-2022 | 2145/RCD-I | 29/11/2021 | 488 | DAS & CHAKRABORTY | 78.91 | 68.92 | 100 | |||
| 146 | RCFA Division -I | Laying of 50 mm dia PVC pipe line and construction of different dia valve chamber, FHTC work and etc. allied works at Kendra area under RCFA Division-I PHE Dte. (Sl No. 03) | ORD/000326/2021-2022 | 2175/RCD I | 06/12/2021 | 10 | MS KALYAN ENTERPRISE | 4.57 | 4.47 | 0 | |||
| 147 | RCFA Division -I | Supply of 10 mm NB Gun-metal ferrule for Providing FHTC through Retrofitting at Chapui (CT) Mouza, G.P.- Ratibati, Block- Raniganj of Ratibati Water supply scheme under RCFA Division-I, P.H.E. Dte. (Sl No 17) | ORD/000339/2020-2021 | 363/RCD I | 26/02/2021 | 7 | SWATI CORPORATION | 4.68 | 9.36 | 0 | |||
| 148 | RCFA Division -I | Supply of 10 mm NB Gun-metal ferrule for Providing FHTC through Retrofitting at Chelod Mouza, G.P.- Tirat, Block- Raniganj of Ratibati Water supply scheme under RCFA Division-I, P.H.E. Dte.(SL NO 18) | ORD/000341/2020-2021 | 364/RCD I | 26/02/2021 | 7 | MRITYUNJOY MUKHERJEE & CO. | 4.66 | 9.33 | 0 | |||
| 149 | RCFA Division -I | Hiring of Maxi Cab (Non Air- conditioned ) bharatstage - III/BS-III purchased on after 01.05.2008 with Diesel / LPG/CNG Engine. as when required basis for supervision of FHTC related works under JJM) of RCFA Div-I, PHE Dte Govt, of West Bengal ( w.e.f 16.08.2023 to 15.02.2024) | ORD/000354/2023-2024 | 2420/RCD-I | 11/08/2023 | 184 | PRAMIT CHATTERJEE | 0.90 | 2.37 | 100 | |||
| 150 | RCFA Division -I | Supply, fitting fixing railling, grill, painting of pump house, CWR, chlorine room etc and allied works at Ratibati H/W and Tirat Colliery H/W site under RCFA Division-I PHE Dte. (Sl No. 03) | ORD/000359/2021-2022 | 2203/RCD I | 06/12/2021 | 21 | SOMNATH SAMANTA | 3.53 | 2.97 | 0 | |||
| 151 | RCFA Division -I | Acceptance cum work order for Providing FHTC through Retrofitting at Bibirbandh Para and Santipara (Sansad-I) Block-Andal & Pandabeswar of Ukhra Water Supply Scheme under RCFA Division-I PHE Dte. | ORD/000365/2021-2022 | 2323/RCD-I | 16/12/2021 | 30 | GITASHREE FABRICATION | 18.16 | 18.16 | 0 | |||
| 152 | RCFA Division -I | Acceptance cum work order for Providing FHTC through Retrofitting at Huchukpara (Sansad-II) Block-Andal & Pandabeswar of Ukhra Water Supply Scheme under RCFA Division-I PHE Dte. | ORD/000366/2021-2022 | 2324/RCD-I | 16/12/2021 | 30 | A. CONSTRUCTION CO. | 15.53 | 15.53 | 0 | |||
| 153 | RCFA Division -I | Acceptance cum work order for Providing FHTC through Retrofitting at Das Para (Sansad-XIX) Block-Andal & Pandabeswar of Ukhra Water Supply Scheme under RCFA Division-I PHE Dte. | ORD/000367/2021-2022 | 2325/RCD-I | 16/12/2021 | 30 | JYOGOMAYA ENTERPRISE | 12.46 | 10.43 | 0 | |||
| 154 | RCFA Division -I | Acceptance cum work order for Providing FHTC through Retrofitting at Chanchani (Sansad-XII) Block-Andal & Pandabeswar of Ukhra Water Supply Scheme under RCFA Division-I PHE Dte. | ORD/000368/2021-2022 | 2326/RCD-I | 16/12/2021 | 30 | M/S B.K. CONSTRUCTION | 25.70 | 17.19 | 100 | |||
| 155 | RCFA Division -I | Acceptance cum work order for Providing FHTC through Retrofitting at Chanchani (Sansad-X) Block-Andal & Pandabeswar of Ukhra Water Supply Scheme under RCFA Division-I PHE Dte. | ORD/000369/2021-2022 | 2327/RCD-I | 16/12/2021 | 30 | ASHA CONSTRUCTION | 27.72 | 18.23 | 0 | |||
| 156 | RCFA Division -I | Acceptance cum work order for Providing FHTC through Retrofitting at Ukhra Area (Phase-II) Block-Andal & Pandabeswar of Ukhra Water Supply Scheme under RCFA Division-I PHE Dte. (Part-A) | ORD/000370/2021-2022 | 2328/RCD-I | 16/12/2021 | 30 | MD AAMIR KHAN | 14.42 | 14.42 | 0 | |||
| 157 | RCFA Division -I | Acceptance cum work order for Providing FHTC through Retrofitting at Ukhra Area (Phase-II) Block-Andal & Pandabeswar of Ukhra Water Supply Scheme under RCFA Division-I PHE Dte. (Part-D) | ORD/000372/2021-2022 | 2332/RCD-I | 17/12/2021 | 30 | RELIABLE ENGINEERS CO-OP CONSTRUCTION SOCIETY LTD. | 14.44 | 7.14 | 0 | |||
| 158 | RCFA Division -I | Acceptance cum work order for Providing FHTC through Retrofitting at Ukhra Area (Phase-II) Block-Andal & Pandabeswar of Ukhra Water Supply Scheme under RCFA Division-I PHE Dte. (Part-E) | ORD/000373/2021-2022 | 2333/RCD-I | 17/12/2021 | 30 | TARAPRASAD SARKAR | 14.37 | 12.74 | 100 | |||
| 159 | RCFA Division -I | Laying UPVC pipeline for FHTC work for Dhandadihi W/S Scheme under RCFA Div-I, PHE Dte.(Sl no 01) | ORD/000456/2021-2022 | 2458/RCD I | 31/12/2021 | 10 | MACHINO TECHNO | 3.83 | 3.82 | 0 | |||
| 160 | RCFA Division -I | Acceptance cum work order for Construction of 250 cum capacity 20 mtr staging height RCC Over Head Reservoir (pipe connection and cost of pipes, specials at Samlya for Samlya Piped Water Supply Scheme under RCFA Division-I PHE Dte. (Ref Drawing No. PC-I/OHR/10/2012 (Sheet No. 1 & 2) | ORD/000459/2022-2023 | 2934/RCD-I | 17/11/2022 | 12 | M/S CHANDI CHARAN ROY | 80.02 | 80.02 | 100 | |||
| 161 | RCFA Division -I | Providing FHTC through retrofitting at Kumardiha village area of Chold mouza, GP -Ratibati Block Raniganj of Ratibati water supply scheme under RCFA Division-I PHE Dte.(Sl no 08) | ORD/000462/2021-2022 | 2465/RCD I | 31/12/2021 | 7 | D.S.C. CONCERN | 4.81 | 4.81 | 0 | |||
| 162 | RCFA Division -I | Additional laying of different dia UPVC pipeline for extension of distribution system regarding FHTC work at Chelod mouza of Ratibati W/S Scheme under RCFA Div-I PHE Dte.(Sl no 09) | ORD/000463/2021-2022 | 2466/RCD I | 31/12/2021 | 15 | MACHINO TECHNO | 4.78 | 4.55 | 0 | |||
| 163 | RCFA Division -I | Hard rock cutting, laying of different dia UPVC pipe line for extension of distribution system regarding FHTC work at Chelod mouza of Ratibati W/S Scheme under RCFA Div-I PHE Dte.(Sl no 10) | ORD/000464/2021-2022 | 2467/RCD I | 31/12/2021 | 15 | MACHINO TECHNO | 3.06 | 2.82 | 0 | |||
| 164 | RCFA Division -I | Providing FHTC through retrofitting at Damra rural and adjacent area of Chelod mouza, G.P, Tirat , GP Block Raniganj of Ratibati water supply scheme under RCFA Division-I PHE Dte.(Sl no 11) | ORD/000465/2021-2022 | 2468/RCD I | 31/12/2021 | 10 | GOPAL CONSTRUCTION | 4.68 | 4.68 | 0 | |||
| 165 | RCFA Division -I | Formal Work Order for Supplying, laying and aligning of distribution system including FHTC for Shyamla W/S Scheme in Syamla and Bhuri Mouza, Block ¿ Jamuria, Dist ¿ Bardhaman under Shyamla W/S Scheme under RCFA Division-I PHE Dte. (Part ¿ C) | ORD/000479/2022-2023 | 2029/RCD-I | 30/08/2022 | 1030 | SWATI CORPORATION | 337.77 | 234.46 | 85 | |||
| 166 | RCFA Division -I | Laying of different dia UPVC pipeline for extension system regarding FHTC work at Chelod village of Ratibati W/S Scheme under RCFA Div-I PHE Dte. | ORD/000488/2021-2022 | 2464/RCD-I | 31/12/2021 | 15 | MOTIONMASS TECHNO (OPC) PRIVATE LIMITED | 4.81 | 2.35 | 0 | |||
| 167 | RCFA Division -I | Acceptance cum work order for Laying and interconnection work of different dia HDPE pipe line unde Dakshin Khanda area Khandra Zone under RCFA Pt-II W/S Scheme under RCFA Division-I PHE Dte. | ORD/000489/2021-2022 | 118/RCD-I | 20/01/2022 | 30 | UNITED CONSTRUCTION | 13.96 | 10.91 | 0 | |||
| 168 | RCFA Division -I | Acceptance cum work order for Providing FHTC through Retrofitting at Ukhra Area (Phase-II) Block-Andal & Pandabeswar of Ukhra Water Supply Scheme under RCFA Division-I PHE Dte. (Part-C) 2nd Call | ORD/000491/2021-2022 | 120/RCD-I | 20/01/2022 | 30 | GLOBAL CONSTRUCTION | 14.23 | 13.36 | 0 | |||
| 169 | RCFA Division -I | Acceptance cum work order for Providing FHTC through Retrofitting at Sanyasi Kalitala (Sansad-XVI) Block-Andal & Pandabeswar of Ukhra Water Supply Scheme under RCFA Division-I PHE Dte. | ORD/000496/2021-2022 | 2491/RCD-I | 31/12/2021 | 30 | TARA CONSTRUCTION | 11.24 | 10.92 | 0 | |||
| 170 | RCFA Division -I | Acceptance cum work order for Providing FHTC through Retrofitting at Asthana (Sansad-IX) Block-Andal & Pandabeswar of Ukhra Water Supply Scheme under RCFA Division-I PHE Dte. 2nd Call | ORD/000498/2021-2022 | 198/RCD-I | 28/01/2022 | 30 | B M SARKAR | 13.04 | 10.18 | 0 | |||
| 171 | RCFA Division -I | Laying of different dia HDPE pipe line including repairing work of UPVC pipe line and etc. allied works under Khandra Zone distribution pipe line under RCFA Part-II W/S Scheme under RCFA Division-I PHE Dte. (Sl No. 10) | ORD/000508/2021-2022 | 222/RCD I | 01/02/2022 | 15 | UNITED CONSTRUCTION | 4.79 | 4.79 | 0 | |||
| 172 | RCFA Division -I | Supply, fitting fixing of street stand posts and crossing of distribution water branch main through Khandra main road and etc. including interconnection work under Khandra Zone under RCFA Part-II W/S Scheme. (Sl No. 11) | ORD/000509/2021-2022 | 223/RCD I | 01/02/2022 | 12 | UNITED CONSTRUCTION | 2.61 | 2.61 | 0 | |||
| 173 | RCFA Division -I | Laying of 25 mm dia PVC pipe line at Ukhra Adarsha Hindi High School and installation of Street stand post and etc. allied works at Dakshin Khanda area under RCFA Division-I PHE Dte. (Sl No. 12) | ORD/000510/2021-2022 | 224/RCD I | 01/02/2022 | 15 | UNITED CONSTRUCTION | 4.63 | 4.63 | 0 | |||
| 174 | RCFA Division -I | Cleaning compound premises, painting works and preparing approched road with sand and stone dust and other allied works at Kalyaneswari Inspection bunglow under Bahual Retrofitting under RCFA Division-I PHE Dte. (Sl No. 13) | ORD/000511/2021-2022 | 225/RCDI | 01/02/2022 | 7 | JYOGOMAYA ENTERPRISE | 1.81 | 1.81 | 100 | |||
| 175 | RCFA Division -I | Sub Soil Investigation for 200 cum capacity RCC Over Head Reservoir of Barabani Block for Augmentation of Jamgram Piped Water Supply Scheme under RCFA Division-I PHE Dte. in the District of Paschim Bardhaman | ORD/000526/2022-2023 | 3139/RCDI | 12/12/2022 | 7 | P.K TEWARY DRILLING CO. | 0.55 | 0.55 | 100 | |||
| 176 | RCFA Division -I | Sub Soil Investigation for 300 cum capacity RCC Over Head Reservoir of Barabani Block for Augmentation of Sarisatali Piped Water Supply Scheme under RCFA Division-I PHE Dte. in the District of Paschim Bardhaman | ORD/000528/2022-2023 | 3141/RCDI | 12/12/2022 | 7 | P.K TEWARY DRILLING CO. | 0.55 | 0.55 | 100 | |||
| 177 | RCFA Division -I | Sub Soil Investigation for 350 cum capacity RCC Over Head Reservoir of Barabani Block for Augmentation of Panuria Piped Water Supply Scheme under RCFA Division-I PHE Dte. in the District of Paschim Bardhaman | ORD/000529/2022-2023 | 3142/RCDI | 12/12/2022 | 7 | P.K TEWARY DRILLING CO. | 0.55 | 0.55 | 100 | |||
| 178 | RCFA Division -I | Sub Soil Investigation for 200 cum capacity RCC Over Head Reservoir of Jamuria Block for Augmentation of Churulia Piped Water Supply Scheme under RCFA Division-I PHE Dte. in the District of Paschim Bardhaman | ORD/000531/2022-2023 | 3144/RCDI | 12/12/2022 | 7 | P.K TEWARY DRILLING CO. | 0.55 | 0.55 | 100 | |||
| 179 | RCFA Division -I | Additional work of supplying, aligning and laying of 160 mm dia HDPE pipe line for distribution line at Bolkundi village under Chotkara Kanskuli Water Supply Scheme under RCFA Division-I PHE Dte. (Sl No. 07) | ORD/000551/2021-2022 | 250/RCD-I | 01/02/2022 | 15 | DAS & CHAKRABORTY | 2.05 | 2.05 | 0 | |||
| 180 | RCFA Division -I | Additional work for laying of different dia DI (K7) & HDPE pipe line with other allied work from Dabor OHR Zone-II (Lohat, Phulberiya, Patal, Sadhana, Madhaichak, Shyamdihi etc.) distribution Chotkara Kanskuli Water Supply Scheme under RCFA Division-I PHE Dte. (Part-B) (Sl No. 08) | ORD/000552/2021-2022 | 251/RCD-I | 01/02/2022 | 15 | ASHA CONSTRUCTION | 2.18 | 1.96 | 0 | |||
| 181 | RCFA Division -I | Supplying, aligning and laying of HDPE line (Parallel to main distribution) for Ghidoba village & Kushum Danali West side for providing FHTC work under Chotkara Kanskuli Water Supply Scheme under RCFA Division-I PHE Dte. (Sl No. 09) | ORD/000553/2021-2022 | 252/RCD-I | 01/02/2022 | 20 | GITA CONSTRUCTION | 4.98 | 4.71 | 0 | |||
| 182 | RCFA Division -I | Supplying, aligning and laying of 90 mm dia HDPE pipe line (Parallel to main distribution) at village Kushum Danali more towords Ghidoba West side for providing FHTC work under Chotkara Kanskuli Water Supply Scheme under RCFA Division-I PHE Dte. (Sl No. 10) | ORD/000554/2021-2022 | 253/RCD-I | 01/02/2022 | 20 | GITA CONSTRUCTION | 4.99 | 4.71 | 0 | |||
| 183 | RCFA Division -I | Acceptance cum work order for Laying of different dia PVC/HDPE pipe line for extension of distribution system regarding FHTC work at Ratibati Mouza of Ratibati Water Supply Scheme under RCFA Div-I PHE Dte. | ORD/000558/2021-2022 | 581/RCD-I | 02/03/2022 | 15 | SOMNATH SAMANTA | 9.58 | 9.55 | 0 | |||
| 184 | RCFA Division -I | Supplying, aligning and laying of 90 mm dia HDPE pipe line (Parallel to main distribution) at village Kirtansala (part) and Dharaspur village for providing FHTC work under Chotkara Kanskuli Water Supply Scheme under RCFA Division-I PHE Dte. (Sl 11) | ORD/000572/2021-2022 | 254/RCD-I | 01/02/2022 | 20 | DIP CONSTRUCTION | 4.95 | 4.76 | 0 | |||
| 185 | RCFA Division -I | Supplying, aligning and laying of 90 mm dia HDPE pipe line (Parallel to main distribution) at village Kalya (part) and Siakulberia and Chotkara (Part) village for providing FHTC work under Chotkara Kanskuli Water Supply Scheme under RCFA Division-I PHE Dte. (Sl 12) | ORD/000573/2021-2022 | 255/RCD-I | 01/02/2022 | 20 | JAYANTA DATTA | 4.99 | 4.64 | 0 | |||
| 186 | RCFA Division -I | Supplying, aligning and laying of 90 mm dia HDPE pipe line (Parallel to main distribution) at village Kushum Danali more towords Ghidoba East side under Chotkara Kanskuli Water Supply Scheme under RCFA Division-I PHE Dte. (Sl No. 15) | ORD/000575/2021-2022 | 257/RCD-I | 01/02/2022 | 20 | B.T.M CONCERN | 4.98 | 4.75 | 0 | |||
| 187 | RCFA Division -I | Supplying, aligning and laying of 90 mm dia HDPE pipe line (Parallel to main distribution) at village Chotkara (Part) for providing FHTC under Chotkara Kanskuli Water Supply Scheme under RCFA Division-I PHE Dte. (Sl No. 16) | ORD/000576/2021-2022 | 258/RCD-I | 01/02/2022 | 15 | JAYANTA DATTA | 2.59 | 2.48 | 0 | |||
| 188 | RCFA Division -I | Extension of HDPE pipe line (Parallel to main distribution) at village Kirtansala and Dharaspur village (Part) for providing FHTC work under Chotkara Kanskuli Water Supply Scheme under RCFA Division-I PHE Dte. (Sl No. 18) | ORD/000578/2021-2022 | 260/RCD-I | 01/02/2022 | 20 | DIP CONSTRUCTION | 4.98 | 4.64 | 0 | |||
| 189 | RCFA Division -I | Extension of UPVC pipe line (Parallel to main distribution) at village Ghiadoba and Kusumdanali West side for providing FHTC under Chotkara Kanskuli Water Supply Scheme under RCFA Division-I PHE Dte. (Sl No. 20) | ORD/000580/2021-2022 | 262/RCD-I | 01/02/2022 | 20 | GITA CONSTRUCTION | 3.58 | 2.79 | 0 | |||
| 190 | RCFA Division -I | Providing FHTC through retrofitting at Chelod village area (Part-A) of Chelod mouza, GP Ratibati, Block-Raniganj of Ratibati Water Supply Scheme under RCFA Division-I PHE Dte. (Sl No. 15) | ORD/000601/2021-2022 | 278/RCD-I | 01/02/2022 | 30 | M/S MONDAL CONSTRUCTION | 4.84 | 4.55 | 0 | |||
| 191 | RCFA Division -I | Laying of Different dia UPVC /PVC pipeline for extention of distribution system regarding FHTC work at Saora Mouza of Ratibati Water supply Scheme under RCFA Div-I PHE Dte. (Sl No 17) | ORD/000602/2021-2022 | 280/RCD-I | 01/02/2022 | 30 | A. CONSTRUCTION CO. | 4.81 | 4.81 | 0 | |||
| 192 | RCFA Division -I | Providing FHTC through retrofitting at Chelod village area (Part-B) of Chelod mouza, GP Ratibati, Block-Raniganj of Ratibati Water Supply Scheme under RCFA Division-I PHE Dte. (Sl No. 16) | ORD/000606/2021-2022 | 279/RCD-I | 01/02/2022 | 30 | M/S U.G. ENTERPRISE | 4.84 | 4.84 | 100 | |||
| 193 | RCFA Division -I | Extension of UPVC Pipe line at Uttarrampur and Part of Kalisanko including connection to different ICDS & FP Schools for providing FHTC under Chotkara Kanskuli Water Supply Scheme under RCFA Division-I PHE Dte. (Sl no 01) | ORD/000607/2021-2022 | 630/ RCD I | 09/03/2022 | 15 | KHEPI MAA TRADERS | 4.18 | 2.74 | 0 | |||
| 194 | RCFA Division -I | Supplying, aligning and laying of HDPE pipe line for byepass water supply arrangement to Chapui village under Ratibati Water Supply Scheme under RCFA Division-I PHE Dte. (Part-A)(Sl no 02) | ORD/000608/2021-2022 | 631/RCD-1 | 09/03/2022 | 15 | SWATI CORPORATION | 4.75 | 4.75 | 0 | |||
| 195 | RCFA Division -I | Emergency supplying. Aligning and laying of HDPE pipe line for bypass water supply arrangement to Chapui village under Ratibati water supply scheme under RCFA Division-I PHE Dte. (Part-B)(Sl no 3) | ORD/000609/2021-2022 | 632/RCD 1 | 09/03/2022 | 15 | SWATI CORPORATION | 4.76 | 4.72 | 0 | |||
| 196 | RCFA Division -I | Emergency supplying. Aligning and laying of HDPE pipe line for bypass water supply arrangement to Chapui village under Ratibati water supply scheme under RCFA Division-I PHE Dte. (Part-C)(Sl no 04) | ORD/000610/2021-2022 | 633/RCD 1 | 09/03/2022 | 15 | SWATI CORPORATION | 4.84 | 4.82 | 0 | |||
| 197 | RCFA Division -I | Supplying, aligning and laying of HDPE line (parallel to main distribution) at Ghidoba, Kushum Danali and extension of pipe line at Ghiadoba village for providing FHTC under Chotkara Kanskuli water supply scheme under RCFA Division-I PHE Dte.(Sl no 07) | ORD/000613/2021-2022 | 636/RCD 1 | 09/03/2022 | 15 | DAS & CHAKRABORTY | 3.01 | 2.45 | 0 | |||
| 198 | RCFA Division -I | Supplying, aligning and laying of UPVC line (parallel to main distribution) at Malladihi Hospital para towards Chayanpur for providing FHTC work under Chotkara Kanskuli water supply scheme under RCFA Division-I PHE Dte. (Sl no 09) | ORD/000615/2021-2022 | 638/RCD 1 | 09/03/2022 | 15 | MD AAMIR KHAN | 2.82 | 0.00 | 0 | |||
| 199 | RCFA Division -I | Acceptance cum work order for laying of different dia distribution pipe line and allied works etc at Bisseswari Muslimpara and adjacent area of Khandra area under Improvement of RCFA Part-II Water Supply Scheme under RCFA Division-I PHE Dte. | ORD/000636/2022-2023 | 334/RCD I | 30/01/2023 | 15 | M/S B.K. CONSTRUCTION | 7.68 | 7.58 | 100 | |||
| 200 | RCFA Division -I | Acceptance cum work order for Laying of different dia HDPE pipe line towards Bisserari, Anandapally and etc. adjacent area under Khandra area Block Andal & Pandabeswar of Improvement of RCFA Part-II Water Supply scheme under RCFA Division-I PHE Dte. | ORD/000684/2022-2023 | 372/RCD I | 30/01/2023 | 15 | M/S B.K. CONSTRUCTION | 6.87 | 6.83 | 100 | |||
| 201 | RCFA Division -I | Block Level Orientation Programme involving PRI functionaries on Jal Jeevan Mission and its components at Barabani, Salanpur, Jamuria, Pandabeswar, Raniganj, Andal, Kansha & Durgapur Faridpur Block in the Districts of Paschim Bardhaman under RCFA Division-I PHE Dte. | ORD/000718/2023-2024 | Camp_02_8_Nos_Block_AE_II | 26/09/2023 | 30 | MUKHERJEE TRADERS | 3.79 | 3.79 | 100 | |||
| 202 | RCFA Division -I | Acceptance cum work order for Interconnection work including Augurboring, supply of value, construction of valve, construction of valve chamber within command under Dabor OHR under Retrofitting of 4 Nos. PWSS for providing FHTC under RCFA Division-I PHE Dte (sl. no-6). | ORD/000772/2022-2023 | 804/RCD-I | 06/03/2023 | 10 | RELIABLE ENGINEERS CO-OP CONSTRUCTION SOCIETY LTD. | 12.51 | 12.28 | 0 | |||
| 203 | RCFA Division -I | Acceptance cum Providing FHTC of retrofitting at Kumardihi village (left out portion) of kumardihi Mouza, GP Ratibati, Block-Raniganj of Ratibati Water Supply Sceme under RCFA Division -I PHE Dte. | ORD/000775/2022-2023 | 806/RCD-I | 06/03/2023 | 20 | M/S MONDAL CONSTRUCTION | 13.78 | 12.41 | 100 | |||
| 204 | RCFA Division -I | Acceptance cum work order for supplying, aligning, laying of PVC & HDPE Pipeline, Construction of Sluice valve chamber and supplying, aligning, laying of G.I Pipe under Retrofitting of Madantore PWSS scheme under RCFA Division-I PHE Dte. | ORD/000784/2022-2023 | 405/RCD-I | 30/01/2023 | 15 | M/S S.K. ENTERPRISE | 5.17 | 5.17 | 0 | |||
| 205 | RCFA Division -I | Acceptance cum work order Sinking of 5 (Five nos. 200mm dia river bed tube wells including collecting main instead of defunct tube well at river Damodar (intake well Site ) Kalajharia Under Omprovement of RCFS part-II W/S Scheme under RCFA Division-I PHE Dte. (Part-G). | ORD/000789/2022-2023 | 402/RCDI | 30/01/2023 | 15 | DURGADAS MONDAL | 8.43 | 7.68 | 0 | |||
| 206 | RCFA Division -I | Acceptance cum work order for Providing FHTC through Retrofitting at Ukhra Area (Phase-II) Block-Andal & Pandabeswar of Ukhra Water Supply Scheme under RCFA Division-I PHE Dte. (Part-D) | ORD/000851/2021-2022 | 2332/RCD-1 | 17/12/2021 | 30 | RELIABLE ENGINEERS CO-OP CONSTRUCTION SOCIETY LTD. | 14.44 | 4.03 | 0 | |||
| 207 | RCFA Division -I | Hiring of SUV (A.C) (Non-Air conditioned) Bharat Stage-IV/BS-IV purchased on or after 01.01.2022 with Diesel/LPG/CNG Engine. For the office Use of the Deputy Superintending Engineer Engineer, RCFA W/S Circle, PHE Dte Govt. of West Bengal (w.e.f 01.02.2023 to 31.07.2023) | ORD/000872/2022-2023 | 455/RCDI | 31/01/2023 | 181 | SHYAMAL MAJI | 0.90 | 0.30 | 80 | |||
| 208 | RCFA Division -I | Acceptance cum work order Laying of different dia HDPE pipe line and allied works at Kankardanga Part (Sansad-VIII) at Ukhra area under Augmentation of RCFA Part-II (Zone-2A) PWSS under RCFA Division-I PHE Dte. (Sl No. 18) | ORD/000906/2022-2023 | 1162/RCD-I | 24/03/2023 | 15 | SHILPA UDDOYG ENGINEERING CO-OP SOCIETY LTD. | 1.42 | 1.29 | 100 | |||
| 209 | RCFA Division -I | Acceptance cum work order Laying of different 140 mm dia HDPE pipe line including interconnection and fitting, fixing sluice valves and etc allied works at Maira Dipu area under Khandra Zone under RCFA Part-II Water Supply Scheme under RCFA Division-I PHE Dte. | ORD/000923/2022-2023 | 1259/ RCD I | 27/03/2023 | 15 | TARA CONSTRUCTION | 2.32 | 2.16 | 0 | |||
| 210 | RCFA Division -I | Acceptance cum work order Emergency repairing of damaged collecting main in river Damodar and allied works at Surjanagar H/W site of Surjanagar W/S Scheme under RCFA Division-I PHE Dte. | ORD/000924/2022-2023 | 1257/RCD-I | 27/03/2023 | 15 | MD. JAWED KHAN | 4.31 | 4.15 | 0 | |||
| 211 | RCFA Division -I | Acceptance cum work order Supply and installation of sluice valve, shifting of household connection instead of old AC pipe line to distribution branch and etc allied works at Baidyanathpur Namopara, Bouripara and adjacent area under Baidyanathpur W/S Scheme under RCFA Division-I PHE Dte. | ORD/000926/2022-2023 | 1258/ RCD I | 27/03/2023 | 15 | SOMNATH SAMANTA | 2.50 | 2.49 | 0 | |||
| 212 | RCFA Division -I | Acceptance cum work order Laying of 90 mm dia HDPE pipe line and etc allied works at Baidyanathpur Namopara, Bouripara under Baidyanathpur W/S Scheme under RCFA Division-I PHE Dte. | ORD/000929/2022-2023 | 1264/RCD-I | 27/03/2023 | 15 | SOMNATH SAMANTA | 2.72 | 2.59 | 0 | |||
| 213 | RCFA Division -I | Acceptance cum work order Laying of different dia HDPE pipe line towards Ruidas Para and Baouripara under Dakshin Khanda (Jl No. 36) area Block - Andal of RCFA Part-II W/S Scheme under RCFA Division-I PHE Dte. | ORD/000938/2022-2023 | 1272/ RCD I | 27/03/2023 | 15 | DURGADAS MONDAL | 3.71 | 3.68 | 0 | |||
| 214 | RCFA Division -I | Acceptance cum work order Laying of different dia distribution pipe line at Sukopara (Part), Bauripara (Part) etc adjacent area at Ukhra Gram Panchayet (Sansad-XX) Augmentation of RCFA Part-II (Zone-2A) W/S Scheme under RCFA Division-I PHE Dte. | ORD/000939/2022-2023 | 1275/RCD-I | 27/03/2023 | 15 | SOMNATH SAMANTA | 3.25 | 2.95 | 0 | |||
| 215 | RCFA Division -I | Acceptance cum work order Repairing & shifting work of DI pipes, repairing of 350 mm dia MS pipe and allied repairing at Madanpur W/S Scheme under RCFA Division-I PHE Dte. | ORD/000940/2022-2023 | 1278/ RCD I | 27/03/2023 | 15 | MD. JAWED KHAN | 4.78 | 4.69 | 100 | |||
| 216 | RCFA Division -I | Acceptance cum work order Laying of different dia distribution pipe line at Baidyanathpur Namopara, Bouripara and adjacent area under Baidyanathpur W/S Scheme under RCFA Division-I PHE Dte. | ORD/000942/2022-2023 | 1276/RCD-I | 27/03/2023 | 15 | SOMNATH SAMANTA | 3.61 | 3.48 | 0 | |||
| 217 | RCFA Division -I | Acceptance cum work order Supplying Laying 90 mm dia HDPE pipe line, sluice valve chamber, Street Stand Post and other allied works within Amritnagar Rising Main & Distribution of Tirat Colliery W/S Scheme Zone under Improvement Part-II W/S Scheme under RCFA Division-I PHE Dte. | ORD/000943/2022-2023 | 1279/RCD-I | 27/03/2023 | 15 | MS KALYAN ENTERPRISE | 4.81 | 4.80 | 0 | |||
| 218 | RCFA Division -I | Acceptance cum work order Construction of Street Stand Post, Sluice Valve Chamber and Aligning Laying HDPE pipe in different places (Nimcha, Damra, Chelod Bouripara, Tirat Hospital Etc.) under Tirat Colliery W/S Scheme under RCFA Division-I PHE Dte. | ORD/000944/2022-2023 | 1281/RCD-I | 27/03/2023 | 15 | MS KALYAN ENTERPRISE | 4.57 | 4.57 | 80 | |||
| 219 | RCFA Division -I | acceptance cum work order Repairing of 450 mm dia DI pipe line at Baidyanathpur, Barachak, Jagaridih area of ASTA rising main of ASTA Water Supply Scheme under RCFA Division-I PHE Dte. | ORD/000946/2022-2023 | 1282/RCD-I | 27/03/2023 | 15 | SIMA ENTERPRISE | 2.66 | 2.66 | 0 | |||
| 220 | RCFA Division -I | Acceptance cum work order Interconnection work of 200 distribution main at Ukhra Zone and emergency repairing of 400 mm dia rising main at Khandra Zone under RCFA Part-II W/S Scheme under RCFA Division-I PHE Dte. | ORD/000947/2022-2023 | 1285/ RCD I | 27/03/2023 | 15 | RANJIB GHATAK | 4.28 | 4.26 | 100 | |||
| 221 | RCFA Division -I | Acceptance cum work order 300 mm dia MS Bye pass line and interconnection work at Khandra OHR site and allied works of Dakhin Khandra and Mahira adjacent area under Retrofitting of 4 Nos. Piped Water Supply Scheme under RCFA Division-I PHE Dte. | ORD/000957/2022-2023 | 1056/RCD-I | 23/03/2023 | 15 | UNITED CONSTRUCTION | 15.47 | 15.47 | 0 | |||
| 222 | RCFA Division -I | Acceptance cum work order Construction of stand post on emergency basis at Rupnarayanpur, Rangamati area of Rupnarayanpur Zone under 4 Nos. retrofitting PWSS under RCFA Division-I PHE Dte. | ORD/000987/2022-2023 | 1266/RCD-1 | 27/03/2023 | 15 | B.B. CONSTRUCTION | 2.80 | 2.78 | 0 | |||
| 223 | RCFA Division -I | Acceptance cum Work Order for Laying 200 mm dia MS water pipe line with 600 mm dia MS casing pipe for railway crossing in between Jamuria (JMA) and Barabani (BBI) at KM 25/2-3 in Asansol Division under JJM of Retrofitting of Bagdiha & adjoining mouzas for providing FHTC within Jamuria Block under RCFA Division-I PHE Dte. | ORD/001124/2023-2024 | 931/RCD-I | 15/03/2024 | 30 | SOMNATH SAMANTA | 23.15 | 22.61 | 100 | |||
| 224 | RCFA Division -I | Material Requisition To Resource Division | RTOR000001/2021-2022 | 2280/RCD-I | 12/12/2021 | 0 | Resource Division | 20.23 | 0.00 | 0 | |||
| 225 | RCFA Division -I | Material Requisition To Resource Division | RTOR000002/2021-2022 | 2281/RCD-I | 12/12/2021 | 0 | Resource Division | 10.17 | 0.00 | 0 | |||
| 226 | RCFA Division -I | Material Requisition To Resource Division | RTOR000003/2021-2022 | 2283 | 12/12/2021 | 0 | Resource Division | 18.59 | 0.00 | 0 | |||
| 227 | RCFA Division -I | Material Requisition To Resource Division | RTOR000005/2023-2024 | 1854/RCD-I | 31/05/2023 | 0 | Resource Division | 7.25 | 0.00 | 0 | |||
| 228 | RCFA Division -I | Material Requisition To Resource Division | RTOR000006/2023-2024 | 1857/RCD-I | 31/05/2023 | 0 | Resource Division | 1.76 | 0.00 | 0 | |||
| 229 | RCFA Division -I | Material Requisition To Resource Division | RTOR000007/2021-2022 | 438/RCD-I | 21/02/2022 | 0 | Resource Division | 8.25 | 0.00 | 0 | |||
| 230 | RCFA Division -I | Material Requisition To Resource Division | RTOR000008/2021-2022 | 437/RCD-I | 21/02/2022 | 0 | Resource Division | 2.75 | 0.00 | 0 | |||
| 231 | RCFA Division -I | Material Requisition To Resource Division | RTOR000009/2021-2022 | 439/RCD-I | 21/02/2022 | 0 | Resource Division | 11.00 | 0.00 | 0 | |||
| 232 | RCFA Division -I | Repairing of 6 (Six) nos panel board, panel board wiring, Supply and installation of 10 HP submersible pump & motor & cable laying & other allied works at Ratibati river bed pump house site of Ratibati W/S Scheme under RCFA Division-I PHE Dte. (Sl No. 02) | VCH/000069/2022-2023 | 172/22-23 | 13/06/2022 | 0 | M/S PIONEER CONSTRUCTION | 4.67 | 0.00 | 0 | |||
| 233 | RCFA Division -I | Providing FHTC through retrofitting at Dhandardihi Mouza, vill-Madanpur, Block -Andal of Dhandadihi Water supply scheme under RCFA Div-I PHE Dte. | VCH/000832/2020-2021 | 45/21-22 | 15/07/2021 | 0 | MACHINO TECHNO | 25.79 | 0.00 | 0 | |||
| Total | 2,887.28 | 2,890.56 | |||||||||||