D4- Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Clear
Rs. in Lakh
Sl No. Division
Working Divisions
Sub Division
Working Divisions
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
2273 1,69,001.58 87,102.53  
1 Barasat Division Enhancement of GST for the work providing FHTC for augmentation of Bergum water supply scheme BILL/00272/2024-2025 BP-2024-25-54 19/06/2024 0 UMWELT ENGINEER PVT.LTD. 33.93 0.00 0
2 Barasat Division Enhancement of GST for the work providing FHTC for augmentation of Khulna Bhanderkhali (Zone-I) BILL/00273/2024-2025 BP-2024-25-78 10/07/2024 0 UMWELT ENGINEER PVT.LTD. 25.40 0.00 0
3 Barasat Division Enhancement of GST for the work providing FHTC for Augmentation of Maslandapur (Zone-I) W/S Scheme BILL/00274/2024-2025 BP-2024-25-778 10/07/2024 0 UMWELT ENGINEER PVT.LTD. 25.55 0.00 0
4 Barasat Division Enhancement of GST for the work providing FHTC for Augmentation of Kalinagar (Zone-II) W/S Scheme BILL/00275/2024-2025 BP-2024-25-78 10/07/2024 0 UMWELT ENGINEER PVT.LTD. 6.76 0.00 0
5 Barasat Division Strengthening and improvement of RIDF road BILL/00602/2024-2025 BP-2024-25-220 02/09/2024 0 EXECUTIVE ENGINEER (HPIU), WBSRDA ,BARASAT DIVISION 45.30 0.00 0
6 Barasat Division Restoration works BILL/00743/2024-2025 BP-2024-25-240 06/09/2024 0 EXECUTIVE ENGINEER-II, P.W.D,BARASAT DIVN 16.77 0.00 0
7 Barasat Division Restoration works BILL/00744/2024-2025 BP-2024-25-240 06/09/2024 0 EXECUTIVE ENGINEER-II, P.W.D,BARASAT DIVN 2.80 0.00 0
8 Barasat Division Enhancement of GST for providing Functional Household Tap Connection (FHTC) in connection with JJM and Jal Swapna Programme within command area of Sangrampur WS Scheme BILL/00831/2024-2025 BP-02024-25-262 12/09/2024 0 H.I.ENTERPRISE. 34.82 0.00 0
9 Barasat Division Enhancement of GST for providing Functional Household Tap Connection (FHTC) in connection with JJM and Jal Swapna Programme within command area of Ghatpatila Zone-I WS Scheme BILL/00832/2024-2025 BP-02024-25-262 12/09/2024 0 H.I.ENTERPRISE. 22.17 0.00 0
10 Barasat Division Enhancement of GST for providing Functional Household Tap Connection (FHTC) in connection with JJM and Jal Swapna Programme within command area of Jafarpur WS Scheme BILL/00833/2024-2025 BP-2024-25-262 12/09/2024 0 H.I.ENTERPRISE. 23.64 0.00 0
11 Barasat Division Enhancement of GST for laying of distribution pipe line and providing FHTC for Augmentation of Gotra water supply scheme under Basirhat Sub-Division, P.H.E.Dte. BILL/01246/2024-2025 BP-2024-25-393 04/10/2024 0 BALAJI UDDYOG 16.00 0.00 0
12 Barasat Division Enhancement of GST for laying of distribution pipe line and providing FHTC for Augmentation of Sadiknagar Zone -I water supply scheme under Basirhat Sub-Division, P.H.E.Dte. BILL/01247/2024-2025 BP-2024-25-391 04/10/2024 0 PUSPA ENTERPRISE. 13.91 0.00 0
13 Barasat Division Enhancement amount of GST for laying of DI/UPVC distribution pipe line and providing FHTC for Augmentation Kamlanbas wsscheme. BILL/01248/2024-2025 BP-2024-25-416 07/10/2024 0 BANERJEE CONSTRUCTION. ( BARASAT) 7.08 0.00 0
14 Barasat Division Regarding Restoration charges for road damages. BILL/03460/2023-2024 BP-2023-24-830 15/03/2024 0 EXECUTIVE ENGINEER BARASAT HIGHWAY DIVISION NO -I P.W. (ROADS) DIRECTORATE 18.45 0.00 0
15 Barasat Division Regarding Restoration charges for road damages. BILL/03461/2023-2024 BP-2023-24-830 15/03/2024 0 EXECUTIVE ENGINEER BARASAT HIGHWAY DIVISION NO -I P.W. (ROADS) DIRECTORATE 76.53 0.00 0
16 Barasat Division Regarding Restoration charges for road damages. BILL/03462/2023-2024 BP-2023-24-830 15/03/2024 0 EXECUTIVE ENGINEER BARASAT HIGHWAY DIVISION NO -I P.W. (ROADS) DIRECTORATE 31.71 0.00 0
17 Barasat Division Regarding Restoration charges for road damages. BILL/03463/2023-2024 BP-2023-24-830 15/03/2024 0 EXECUTIVE ENGINEER BARASAT HIGHWAY DIVISION NO -I P.W. (ROADS) DIRECTORATE 48.02 0.00 0
18 Barasat Division Regarding Restoration charges for road damages. BILL/03464/2023-2024 BP-2023-24-830 15/03/2024 0 EXECUTIVE ENGINEER BARASAT HIGHWAY DIVISION NO -I P.W. (ROADS) DIRECTORATE 28.09 0.00 0
19 Barasat Division Regarding Restoration charges for road damages. BILL/03465/2023-2024 BP-2023-24-830 15/03/2024 0 EXECUTIVE ENGINEER BARASAT HIGHWAY DIVISION NO -I P.W. (ROADS) DIRECTORATE 49.56 0.00 0
20 Barasat Division Regarding Restoration charges for road damages. BILL/03466/2023-2024 BP-2023-24-830 15/03/2024 0 EXECUTIVE ENGINEER BARASAT HIGHWAY DIVISION NO -I P.W. (ROADS) DIRECTORATE 13.30 0.00 0
21 Barasat Division Regarding Restoration charges for road damages. BILL/03467/2023-2024 BP-2023-24-830 15/03/2024 0 EXECUTIVE ENGINEER BARASAT HIGHWAY DIVISION NO -I P.W. (ROADS) DIRECTORATE 40.09 0.00 0
22 Barasat Division Regarding Restoration charges for road damages. BILL/03468/2023-2024 BP-2023-24-830 15/03/2024 0 EXECUTIVE ENGINEER BARASAT HIGHWAY DIVISION NO -I P.W. (ROADS) DIRECTORATE 32.73 0.00 0
23 Barasat Division Regarding Restoration charges for road damages. BILL/03469/2023-2024 BP-2023-24-830 15/03/2024 0 EXECUTIVE ENGINEER BARASAT HIGHWAY DIVISION NO -I P.W. (ROADS) DIRECTORATE 8.79 0.00 0
24 Barasat Division Regarding Restoration charges for road damages. BILL/03470/2023-2024 BP-2023-24-830 15/03/2024 0 EXECUTIVE ENGINEER BARASAT HIGHWAY DIVISION NO -I P.W. (ROADS) DIRECTORATE 39.73 0.00 0
25 Barasat Division Regarding Restoration charges for road damages. BILL/03471/2023-2024 BP-2023-24-830 15/03/2024 0 EXECUTIVE ENGINEER BARASAT HIGHWAY DIVISION NO -I P.W. (ROADS) DIRECTORATE 24.25 0.00 0
26 Barasat Division Formal work order for Providing Functional House Hold Tap Connection (FHTC) from existing and new proposed distribution system with in command area at Bagdah Water Supply Scheme under Bongaon Sub-Division, PHE Dte.(Augmentation). ORD/000001/2022-2023 1002/BD 04/04/2022 1350 MAHAVIR PUMPS MANUFACTURING PVT.LTD. 450.95 309.82 80
27 Barasat Division Acceptance Cum Work Order for Sinking of 2 nos. 300 mm. x 200 mm. dia. 360 mtr deep Tubewell by D.R. Rig method at PH No.- 1 & 2 with PVC pipe & strainer having 300mm dia 36 mtr. long housing pipe & 200mm dia 30 mtr. long filter for Augmentation of Durgamandop w/s scheme, Sandeshkhali-II block under Hasnabad Sub-Division, P.H.E. Dte. ORD/000001/2023-2024 1096/BD 06/04/2023 30 MONDAL & CO. (BASIRHAT). 62.05 47.57 0
28 Barasat Division Acceptance cum work order for Restoration of roads and emergency protection work under different places of Dhopaberia Water Supply Scheme within Basirhat Sub-Division under Barasat Division P.H.E.Dte. ORD/000001/2025-2026 1111/BD 08/04/2025 30 MD AMIRUL MOLLA. 23.39 0.00 0
29 Barasat Division Acceptance cum Work Order for Providing Functional Household Tap Connection (FHTC) in Bankra mouza including laying of UPVC/PVC pipe & supply of necessary fittings within Hingalganj Water Supply Scheme (Zone-II), at Hingalganj Block under Hasnabad Sub-Division, PHE Dte. ORD/000002/2022-2023 1295/ BD 05/04/2022 60 MONDAL PRECISION PVT.LTD 112.27 0.00 1
30 Barasat Division Acceptance cum Work order for Sinking of 1 no. 300 mm. x 200 mm. dia. 300 mtr deep Tubewell by D.R. Rig method at PH No.- 2 with PVC pipe & strainer having 300mm dia 36 mtr. long housing pipe & 200mm dia 30 mtr. long filter for Augmentation of Durgapur Baylani w/s scheme (Z-II), Hingalganj block under Hasnabad Sub-Division, P.H.E. Dte. ORD/000002/2023-2024 1097/BD 06/04/2023 30 M/S RAJPATH CONSTRUCTION. 21.46 16.98 0
31 Barasat Division Formal work order for Providing Functional House Hold Tap Connection (FHTC) from existing and new proposed distribution system within command area at Gangrapota Water Supply Scheme under Bongaon Sub-Division, PHE Dte.(Augmentation) ORD/000004/2022-2023 1004/BD 04/04/2022 90 M/S DIPAK ENTERPRISE 298.46 282.74 1
32 Barasat Division Formal work order for Laying of DI/UPVC distribution pipe line and providing Functional Household Tap Connection for Augmentation of Bajitpur Zone-I B water supply scheme in Baduria Block under Barasat Division, P.H.E Dte. ORD/000004/2023-2024 1124/BD 11/04/2023 90 SHIBU BISWAS. 209.36 170.05 82
33 Barasat Division Formal work order for Providing Functional Household Tap Connection(FHTC) from existing and new proposed distribution system within the command area of Nabatkati Water Supply Scheme at Swarupnagar Block under Barasat Division, PHE Dte. ORD/000005/2022-2023 1135/BD 12/04/2022 90 UTPAL CONSTRUCTION & CO. 184.62 159.96 12
34 Barasat Division Formal work order for Laying of UPVC distribution pipeline and Providing FHTC (Functional Household Tap Connection) for Augmentation of Nalabara Zone-II Water Supply Scheme in Swarupnagar Block of North 24 Parganas District under Barasat Division, PHE Dte. ORD/000005/2023-2024 1125/BD 11/04/2023 811 H.I.ENTERPRISE. 634.74 613.98 60
35 Barasat Division Formal work order for road restoration work damaged during pipe laying work under JJM in different water supply scheme under Barasat-I and Amdanga Block under Barasat Division P.H.E.Dte. ORD/000005/2025-2026 1306/BD 24/04/2025 120 PIYALI CONSTRUCTION & GENERAL ORDER SUPPLIER 99.64 0.00 0
36 Barasat Division Formal work order for Providing Functional Household Tap Connection(FHTC) from existing and new proposed distribution system within the command area of Taranipur Water Supply Scheme Zone - II at Swarupnagar Block under Barasat Division, PHE Dte. ORD/000006/2022-2023 1176/BD 19/04/2022 90 UTPAL CONSTRUCTION & CO. 137.41 117.45 13
37 Barasat Division Formal work order for Laying of DI/UPVC distribution pipe line and providing Functional Household Tap Connection(FHTC) for Augmentation of Shimulpur water supply scheme under Bongaon Sub-Division, P.H.E Dte. ORD/000006/2023-2024 1126/BD 11/04/2023 720 SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. 639.23 623.21 100
38 Barasat Division Formal work order for Additional Laying of UPVC distribution pipe line with Protection works in Sankardaha, Khariberia, Bargan Gopalpur & Mallickgheri mouzas under Khariberia w/s scheme within Minakhan block, Hasnabad Sub-Division P.H.E. Dte. ORD/000006/2025-2026 1798/BD 30/05/2025 30 ATCO ENTERPRISE 118.72 0.00 0
39 Barasat Division Formal work order for Providing Functional Household Tap Connection(FHTC) from existing and new proposed distribution system within the command area under Patua Water Supply Scheme at SWARUPNAGAR Block, Dist.- North 24 Parganas under Barasat Division. PHE. Dte. (PHASE-I) ORD/000007/2022-2023 1177/BD 19/04/2022 90 KINGS & CO. 193.55 172.97 1
40 Barasat Division Formal work order for Laying of DI rising main, DI/UPVC distribution pipe line and providing Functional Household Tap Connection in connection with Augmentation of Chandpur water supply scheme (Zone-I), Hasnabad Block under Hasnabad Sub-Division, PHE Dte. ORD/000007/2023-2024 1150/BD 13/04/2023 90 M/S NIRMAN CONSTRUCTION. 318.37 162.88 36
41 Barasat Division Formal work order for Providing Functional House Hold Tap Connection (FHTC) from existing and new proposed distribution system within command area at Krishnachandrapur Water Supply Scheme under Bongaon Sub-Division, PHE Dte.(Augmentation) ORD/000008/2022-2023 1174/BD 19/04/2022 90 SUPRITI ENTERPRISE. 392.59 260.82 1
42 Barasat Division Formal work order for Laying of DI rising main, DI/UPVC distribution pipe line and providing Functional Household Tap Connection in connection with Augmentation of Kalitala water supply scheme (Zone-II), Hingalganj Block under Hasnabad Sub-Division, PHE Dte. ORD/000008/2023-2024 1151/BD 13/04/2023 90 UMWELT ENGINEER PVT.LTD. 851.89 839.63 100
43 Barasat Division Formal Work order for Providing Functional House Hold Tap Connection (FHTC) from existing and new proposed distribution system with in command area at Panchita Water Supply Scheme under Bongaon Sub-Division, PHE Dte.(Augmentation). ORD/000009/2022-2023 1209/BD 21/04/2022 90 UMWELT ENGINEER PVT.LTD. 393.47 386.33 0
44 Barasat Division Acceptance cum work order for Construction of RCC culvert, cut-off wall, approach road and other allied works at Kalil Khal N/H/O Rajjack Molla (Between node point 101 to 294) for Jhikra w/s scheme, Minakhan block under Hasnabad Sub-Division P.H.E. Dte. ORD/000009/2024-2025 1528/BD 07/06/2024 271 RUDRA DAS. 9.89 7.87 85
45 Barasat Division Formal work order for Providing Functional House Hold Tap Connection (FHTC) from existing and new proposed distribution system with in command area at Sindrani (Zone-I) Water Supply Scheme under Bongaon Sub-Division, PHE Dte.(Augmentation). ORD/000010/2022-2023 1210/BD 21/04/2022 90 SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. 299.02 42.84 1
46 Barasat Division Formal work order for Protection work for newly laid UPVC pipe line at different places of Sukhdoani Mouza in connection with retrofitting of Sukhdoani w/s scheme, Sandeshkhali-II block under Hasnabad Sub- Division P.H.E. Dte. ORD/000010/2023-2024 1165/BD 13/04/2023 30 SUPRITI ENTERPRISE. 68.84 68.78 0
47 Barasat Division Acceptance cum work order for Repairing and renovation works of 200 cum. capacity 20mtr. Staging height R.C.C. Over Head water Reservoir for Augmentation of Matiagachha Water Supply Scheme, Habra-II Block within the jurisdiction of Bongaon Sub-Division under Barasat Division, P.H.E. Dte. ORD/000010/2024-2025 1535/BD 07/06/2024 45 B.S.ENTERPRISE. (BASIRHAT) 13.15 13.11 100
48 Barasat Division Formal work order for Laying of DI rising main, DI/UPVC distribution pipe line and providing Functional Household Tap Connection in connection with Augmentation of Malancha water supply scheme (Zone-I), Minakhan Block under Hasnabad Sub-Division, PHE Dte. ORD/000011/2023-2024 1189/BD 19/04/2023 90 S.S.ENTERPRISE. (BAMANGACHI) 417.27 415.63 88
49 Barasat Division Acceptance cum work order for Construction of switch room cum chlorine room with sanitary and water supply arrangement including plinth protection at PH No.-1 (Size-5.40x3.60 mtr.) for Augmentation of Malancha w/s scheme (Z-I), Minakhan block under Hasnabad Sub-Division, P.H.E. Dte. ORD/000011/2025-2026 1606/BD 19/05/2025 30 M/S RAJPATH CONSTRUCTION. 5.91 0.00 0
50 Barasat Division Formal work order for Laying of DI rising main, DI/UPVC distribution pipe line and providing Functional Household Tap Connection in connection with Augmentation of Bajitpur Zone-II water supply scheme (Zone-II), in Baduria Block under Barasat Division, PHE Dte. ORD/000012/2023-2024 1190/BD 19/04/2023 738 DIVINE 330.08 306.72 50
51 Barasat Division Health assessment of existing OHR of Sindrani (Zone-I) PWSS (135 cum) and ancillary structures, Bagdah Block conducting Non-Destructive Test and through visual observation at within the jurisdiction Bongaon Sub-Division under Barasat Division, P.H.E. Dte. ORD/000012/2024-2025 685/Bon 07/06/2024 15 RISHAN ENGINEERING CONSULTANCY 3.12 3.12 100
52 Barasat Division Acceptance cum work order for additional Construction of 2 nos. switch room cum chlorine room (5.40x3.60) for augmentation of Baunia Abad w/s scheme, Sandeshkhali-I block under Hasnabad Sub-Division, P.H.E. Dte. ORD/000012/2025-2026 1633/BD 20/05/2025 60 JAGANNATH CONSTRUCTION. 18.20 0.00 0
53 Barasat Division Formal work order for Laying of DI/UPVC distribution pipe line and Providing (FHTC) for augmentation of Gadpukuria (Zone-II) Water Supply Scheme, under Bongaon Sub-Division, PHE Dte. ORD/000013/2023-2024 1683/BD 07/06/2023 720 DEBAPRASAD MONDAL. 368.15 144.66 60
54 Barasat Division Health assessment of existing OHR of Sindrani (Zone-II) PWSS (135 cum) and ancillary structures, Bagdah Block conducting Non-Destructive Test and through visual observation at within the jurisdiction Bongaon Sub-Division under Barasat Division, P.H.E. Dte. ORD/000013/2024-2025 686/Bon 07/06/2024 15 RISHAN ENGINEERING CONSULTANCY 2.91 2.91 100
55 Barasat Division Acceptance cum work order for Construction of switch room cum chlorine room with sanitary and water supply arrangement including plinth protection for Augmentation of Fakirtakia w/s scheme, Sandeshkhali-I block under Hasnabad Sub-Division, P.H.E. Dte. ORD/000013/2025-2026 1604/BD 19/05/2025 30 M/S SAIN ENTERPRISE. 10.62 0.00 0
56 Barasat Division Formal work order for Laying of DI/UPVC distribution pipe line and Providing Functional House Hold Tap Connection (FHTC) for Augmentation of Deora Water Supply Scheme within the jurisdiction of Habra Sub-Division under Barasat Division, P.H.E. Dte. ORD/000014/2023-2024 1191/BD 19/04/2023 90 CHANDA CONSTRUCTION. 267.73 261.22 100
57 Barasat Division Health assessment of existing OHR of Bagdah PWSS (341 cum) and ancillary structures, Bagdah Block conducting Non-Destructive Test and through visual observation at within the jurisdiction Bongaon Sub-Division under Barasat Division, P.H.E. Dte. ORD/000014/2024-2025 687/Bon 07/06/2024 15 SIRCON ENGINEERING SERVICES 4.74 4.74 100
58 Barasat Division Acceptance cum work order for Sinking of 2 nos. 300 mm. x 200 mm. dia. 360 mtr deep Tubewell by D.R. Rig method at PH No.- 1 & 2 with PVC pipe & strainer having 300mm dia 36 mtr. long housing pipe & 200mm dia 30 mtr. long filter for Augmentation of Baunia Abad w/s scheme, Sandeshkhali-I block under Hasnabad Sub-Division, P.H.E. Dte. ORD/000015/2023-2024 1201/BD 20/04/2023 30 M/S NIRMAN CONSTRUCTION. 62.06 43.71 56
59 Barasat Division Health assessment of existing OHR of Kurulia (Zone-I) PWSS (225 cum) and ancillary structures, Bagdah Block conducting Non-Destructive Test and through visual observation at within the jurisdiction Bongaon Sub-Division under Barasat Division, P.H.E. Dte. ORD/000015/2024-2025 688/Bon 07/06/2024 15 SIRCON ENGINEERING SERVICES 4.05 4.05 100
60 Barasat Division Acceptance cum work order for Sinking of 1 no. 300 mm. x 200 mm. dia. 360 mtr deep Tubewell by D.R. Rig method at PH No.- 1 with PVC pipe & strainer having 300mm dia 36 mtr. long housing pipe & 200mm dia 30 mtr. long filter for Augmentation of Korakati w/s scheme, Sandeshkhali-II block under Hasnabad Sub-Division, P.H.E. Dte. ORD/000016/2023-2024 1202/BD 20/04/2023 30 TRISHA ENTERPRISE & CO. 31.02 23.48 0
61 Barasat Division Health assessment of existing OHR of Kurulia (Zone-II) PWSS (225 cum) and ancillary structures, Bagdah Block conducting Non-Destructive Test and through visual observation at within the jurisdiction Bongaon Sub-Division under Barasat Division, P.H.E. Dte. ORD/000016/2024-2025 689/Bon 07/06/2024 15 SIRCON ENGINEERING SERVICES 4.53 4.53 100
62 Barasat Division Acceptance cum work order for Additional laying of pipe line with UPVC pipe due to damage of existing pipe line and allied works and construction of IEP back wash drain and allied works under Augmentation work at Ashudi W/S Scheme at Habra-II Block within the jurisdiction of Bongaon Sub-Division under Barasat Division, P.H.E. Dte. ORD/000016/2025-2026 1524/BD 14/05/2025 180 NEW MILLENNIUM ENGG'S CO-OP-SO-LTD. 33.14 0.00 80
63 Barasat Division Acceptance cum work order for Sinking of 1 no. 300 mm. x 200 mm. dia. 300 mtr deep Tubewell by D.R. Rig method at PH No.- 1 with PVC pipe & strainer having 300mm dia 36 mtr. long housing pipe & 200mm dia 30 mtr. long filter for Augmentation of Hingalganj w/s scheme (Z-I), Hingalganj block under Hasnabad Sub-Division, P.H.E. Dte. ORD/000017/2023-2024 1203/BD 20/04/2023 30 ANJALI ENTERPRISE. 21.52 18.03 0
64 Barasat Division Acceptance cum work order for Additional laying of UPVC pipe to connect every house hold FHTC with Augmentation work at Chhaygharia (Zone-I) W/S Scheme under Bongaon block within the jurisdiction of Bongaon Sub-Division, under Barasat Division, P.H.E. Dte. ORD/000017/2025-2026 1383/BD 30/04/2025 90 DEBAPRASAD MONDAL. 34.01 0.00 0
65 Barasat Division Acceptance cum work order for Sinking of 2 nos. 300 mm. x 200 mm. dia. 300 mtr deep Tubewell by D.R. Rig method at PH No.- 1 & 2 with PVC pipe & strainer having 300mm dia 36 mtr. long housing pipe & 200mm dia 30 mtr. long filter for Augmentation of Rupmari w/s scheme (Z-II), Hingalganj block under Hasnabad Sub-Division, P.H.E. Dte. ORD/000018/2023-2024 1204/BD 20/04/2023 30 M/S DATTA ENTERPRISE. 42.94 37.37 100
66 Barasat Division Health assessment of existing OHR of Helencha PWSS (350 cum) and ancillary structures, Bagdah Block conducting Non-Destructive Test and through visual observation at within the jurisdiction Bongaon Sub-Division under Barasat Division, P.H.E. Dte. ORD/000018/2024-2025 690/Bon 07/06/2024 15 SIRCON ENGINEERING SERVICES 4.58 4.58 100
67 Barasat Division Acceptance cum work order for Restoration of damaged pipe line due to Construction of Pucca Drain by laying of UPVC pipe at different places under Chhaigharia Gram Panchayet, Bongaon Block of Chhaigharia (Zone - III) W/S Scheme within the jurisdiction of Bongaon Sub-Division under Barasat Division, P.H.E. Dte. ORD/000018/2025-2026 2053/BD 20/06/2025 90 VAI ENTERPRISE. 23.12 0.00 0
68 Barasat Division Acceptance cum work order for Sinking of 2 nos. 300 mm. x 200 mm. dia. 150 mtr deep Tubewell by D.R. Rig method at PH No.- 1 & 2 with PVC pipe & strainer having 300mm dia 36 mtr. long housing pipe & 200mm dia 30 mtr. long filter for Augmentation of Padmapukuria w/s scheme (Z-I), Minakhan block under Hasnabad Sub-Division, P.H.E. Dte. ORD/000019/2023-2024 1205/BD 20/04/2023 30 ABDUL ALIM MONDAL. 25.87 23.75 63
69 Barasat Division Health assessment of existing OHR of Panchita PWSS (180 cum) and ancillary structures, Bongaon Block conducting Non-Destructive Test and through visual observation at within the jurisdiction Bongaon Sub-Division under Barasat Division, P.H.E. Dte. ORD/000019/2024-2025 691/Bon 07/06/2024 15 SIRCON ENGINEERING SERVICES 3.53 3.53 100
70 Barasat Division Acceptance cum work order for Sinking of 1 no. 300 mm. x 200 mm. dia. 360 mtr deep Tubewell by D.R. Rig method at PH No.- 1 with PVC pipe & strainer having 300mm dia 36 mtr. long housing pipe & 200mm dia 30 mtr. long filter for Augmentation of Monipur w/s scheme, Sandeshkhali-II block under Hasnabad Sub-Division, P.H.E. Dte. ORD/000020/2023-2024 1206/BD 20/04/2023 30 UNIFIED ENGINEERS' CO-OPERATIVE SOCIETYLTD. 31.03 24.86 51
71 Barasat Division Acceptance cum work order for Sinking of 2 nos. 300 mm. x 200 mm. dia. 300 mtr deep Tubewell by D.R. Rig method at PH No.- 1 & 2 with PVC pipe & strainer having 300mm dia 36 mtr. long housing pipe & 200mm dia 30 mtr. long filter for Augmentation of Rupmari w/s scheme (Z-I), Hingalganj block under Hasnabad Sub-Division, P.H.E. Dte. ORD/000021/2023-2024 1207/BD 20/04/2023 30 M/S PROGATI ENTERPRISE. 42.94 36.11 0
72 Barasat Division Acceptance cum work order Providing Functional Household Tap Connection (FHTC) to the uncovered household at Jayantipur mouza including laying of UPVC pipe and allied works under Augmentation work at Chhaigharia (Zone-III) W/S Scheme under Chhaigharia G.P., Bongaon block within the jurisdiction of Bongaon Sub-Division under Barasat Division, P.H.E. Dte. ORD/000021/2025-2026 1649/BD 21/05/2025 90 SUJAN KUMAR MISTRY 25.23 0.00 0
73 Barasat Division Acceptance cum work order for Sinking of 1 nos. 300 mm. x 200 mm. dia. 300 mtr deep Tubewell by D.R. Rig method at PH No.- 1 & 2 with PVC pipe & strainer having 300mm dia 36 mtr. long housing pipe & 200mm dia 30 mtr. long filter for Augmentation of Durgapur Baylani w/s scheme (Z-I), Hingalganj block under Hasnabad Sub-Division, P.H.E. Dte. ORD/000022/2023-2024 1208/BD 20/04/2023 30 SRI KRISHNA CO-OP-LABOUR CONTRACT AND CONST SOC LTD. 21.47 17.10 91
74 Barasat Division Acceptance cum work order for Sinking of 1 Nos. 330.00 mtr. Deep 100 X 50 mm. dia. Trial-cum-production Tube well fitted with Indian Mark - II pump with PVC pipe & strainers at T/W site-1 for Sahebkhali w/s scheme (Zone-II), Hingalganj block under Hasnabad Sub-Division, P.H.E. Dte. ORD/000022/2024-2025 629/HSD 12/06/2024 10 DEB PRASAD GHOSH. 3.50 0.00 0
75 Barasat Division Acceptance cum work order for Additional laying of UPVC pipe to connect every house hold FHTC with Augmentation work at Gadpukuria (Zone-I) W/S Scheme under Bagdah Block within the jurisdiction of Bongaon Sub-Division, under Barasat Division, P.H.E. Dte. ORD/000022/2025-2026 1699/BD 23/05/2025 60 THE TOWER CONSTRUCTION 14.88 0.00 0
76 Barasat Division Formal work order for Laying of DI/UPVC distribution pipe line and providing Functional Household Tap Connection for Augmentation of Dakshin Chatra Zone-I water supply scheme in Baduria Block under Barasat Division, P.H.E Dte. ORD/000023/2023-2024 1210/BD 20/04/2023 951 ALOK ENTERPRSE. (A UNIT OF SAKET TREXIM PVT.LTD) 971.71 571.40 38
77 Barasat Division Acceptance cum work order for 2 nos. pump connection at PH No.-1 & 2 in connection with Augmentation for Bouthakurani water supply scheme (Z-II) , Sandeshkhali-II block under Hasnabad Sub-Division, P.H.E. Dte. ORD/000023/2024-2025 630/HSD 12/06/2024 10 PRITAM MUKHOPADHYAY. 1.02 1.00 100
78 Barasat Division Acceptance cum work order for Providing Functional Household Tap Connection (FHTC) to the uncovered household as well as to convert the mouzas into Swajal Gram including laying of UPVC pipe, Pump Connection of 1 no. newly sunk Replacement Tube well with rising main by DI pipe and allied works under Augmentation of Gobindapur Water Supply Scheme within the jurisdiction of Bongaon Sub-Division under Barasat Division, P.H.E. Dte. ORD/000023/2025-2026 1384/BD 30/04/2025 60 M/S SAYAN ENTERPRISE. 11.50 0.00 0
79 Barasat Division Formal work order for Laying of DI/UPVC distribution pipe line and providing Functional Household Tap Connection for Augmentation of Arsula water supply scheme in Baduria Block under Barasat Division, P.H.E Dte. ORD/000024/2023-2024 1217/BD 20/04/2023 860 J.D.J.ENTERPRISE. (TRADERS PVT.LTD) 667.97 389.66 55
80 Barasat Division Acceptance cum work order for 2 nos. pump connection at PH No.-3 & 4 in connection with Augmentation for Bouthakurani water supply scheme (Z-I) , Sandeshkhali-II block under Hasnabad Sub-Division, P.H.E. Dte. ORD/000024/2024-2025 631/HSD 12/06/2024 10 PRITAM MUKHOPADHYAY. 1.02 1.01 100
81 Barasat Division Acceptance cum work order for Additional laying of UPVC pipe line under Augmentation of Koniara Water Supply Scheme within the jurisdiction of Bongaon Sub-Division under Barasat Division, P.H.E. Dte. ORD/000024/2025-2026 1385/BD 30/04/2025 60 UPWARDS ENGINEERING PRIVATE LIMITED. 11.42 0.00 0
82 Barasat Division Formal work order for Construction of 100 cum capacity CWR, pipe connection and cost of pipes, specials and Laying of DI rising main, DI/UPVC distribution pipe line, providing Functional Household Tap Connection in connection with Augmentation of Chaimalpur water supply scheme, Hasnabad Block under Hasnabad Sub-Division, PHE Dte. ORD/000025/2023-2024 1221/BD 20/04/2023 366 SRI KRISHNA CO-OP-LABOUR CONTRACT AND CONST SOC LTD. 215.47 205.22 65
83 Barasat Division Acceptance cum work order for Restoration of existing 140 mm dia UPVC pipe line along the main road by UC Ballah pilling due to soil erosion at the bank of Ichhamati river near Holor Ghat (Chalk Jhitkipota) under Augmentation work of Kamalabas W/S Scheme, Bagdah block within the jurisdiction of Bongaon Sub-Division under Barasat Division, P.H.E. Dte. ORD/000025/2025-2026 1523/BD 14/05/2025 180 ANARUL KHAN. 61.45 0.00 40
84 Barasat Division Acceptance cum work order for Construction of switch room cum chlorine room with sanitary and water supply arrangement including plinth protection at PH No.-1 (Size-5.40x3.60 mtr.) & PH No.-2 (Size-3.60x3.00 mtr.) for Augmentation of Bhabanipur w/s scheme (Z-I), Hasnabad block under Hasnabad Sub-Division, P.H.E. Dte. ORD/000026/2025-2026 1516/BD 13/05/2025 90 M/S MONDAL CONSTRUCTION 17.62 0.00 0
85 Barasat Division Acceptance cum work order for Sinking of 2 nos. 300 mm. x 200 mm. dia. 180 mtr deep Tubewell by D.R. Rig method at PH No.- 1 & 2 with PVC pipe & strainer having 300mm dia 36 mtr. long housing pipe & 200mm dia 30 mtr. long filter for Augmentation of Barunhat Patlikhanpur w/s scheme (Z-II), Hasnabad block under Hasnabad Sub-Division, P.H.E. Dte. ORD/000027/2023-2024 1218/BD 20/04/2023 30 ANJALI ENTERPRISE. 25.41 17.83 0
86 Barasat Division Acceptance cum work order for Construction of 200 cum capacity CWR , pipe connection and cost of pipes, specials for Augmentation of Sandeshkhali water supply scheme, Sandeshkhali-II Block under Hasnabad Sub-Division, PHE Dte. under Barasat Division, PHE Dte. ORD/000027/2025-2026 1499/BD 13/05/2025 180 SUFIA ENTERPRISE 53.52 0.00 0
87 Barasat Division Acceptance cum work order for Sinking of 1 no. 300 mm. x 200 mm. dia. 180 mtr deep Tubewell by D.R. Rig method at PH No.- 1 with PVC pipe & strainer having 300mm dia 36 mtr. long housing pipe & 200mm dia 30 mtr. long filter for Augmentation of Barunhat Patlikhanpur w/s scheme (Z-I), Hasnabad block under Hasnabad Sub-Division, P.H.E. Dte. ORD/000028/2023-2024 1219/BD 20/04/2023 30 ANJALI ENTERPRISE. 12.70 9.50 0
88 Barasat Division Acceptance cum work order for Additional Construction of 2 nos. switch room cum chlorine room (Size-5.40x3.60 mtr.) for Augmentation of Hingalganj w/s scheme (Z-II), Hingalganj block under Hasnabad Sub-Division, P.H.E. Dte. ORD/000028/2025-2026 1428/BD 06/05/2025 90 SUPER ENTERPRISE 14.14 0.00 0
89 Barasat Division Formal work order for Laying of DI rising main, DI/UPVC distribution pipe line & providing Functional Household Tap Connection with other allied works for Augmentation of Sandeshkhali water supply scheme, Sandeshkhali-II Block under Hasnabad Sub-Division, PHE Dte. ORD/000029/2023-2024 1300/BD 26/04/2023 901 KINGS & CO. 356.31 144.22 45
90 Barasat Division Acceptance cum work order for Repairing and renovation works of 200 cum. capacity 20mtr. Staging height R.C.C. Over Head water Reservoir for Augmentation of Ashudi Water Supply Scheme, Habra-II Block within the jurisdiction of Bongaon Sub-Division under Barasat Division, P.H.E. Dte. ORD/000029/2024-2025 1538/BD 07/06/2024 45 A. R CONS 12.57 12.54 100
91 Barasat Division Formal work order for Laying of DI/UPVC distribution pipe line and providing Functional Household Tap Connection for Augmentation of Gokna Zone-II water supply scheme in Baduria Block under Barasat Division, P.H.E Dte. ORD/000030/2023-2024 1301/BD 26/04/2023 855 J.D.J.ENTERPRISE. (TRADERS PVT.LTD) 766.02 329.99 29
92 Barasat Division Construction of New Pump House (Digha Mouza) with latrine at Chandrapur Water Supply Scheme under Barasat-I Block, size of 3.00m x 3.60m with latrine within Barasat Sub Division, P.H.E.Dte. ORD/000030/2024-2025 166/BSD 07/06/2024 30 JIBON BOSE. 4.18 3.95 100
93 Barasat Division Formal work order for Laying of DI/UPVC distribution pipe line and providing Functional Household Tap Connection for Augmentation of Aturia Zone-II water supply scheme in Baduria Block under Barasat Division, P.H.E Dte. ORD/000032/2023-2024 1305/BD 26/04/2023 90 JAL PRAVAHIKA PVT. LTD. 282.82 143.00 31
94 Barasat Division Formal work order for Protection work in different places of Jhupkhali Mouza in connection with retrofitting of Jhupkhali w/s scheme, Sandeshkhali-II block under Hasnabad Sub- Division P.H.E. Dte. ORD/000034/2023-2024 1324/BD 28/04/2023 30 RADIANT 112.53 112.39 0
95 Barasat Division Formal work order for Laying of DI/UPVC distribution pipe line and providing Functional Household Tap Connection for Augmentation of Bithari Zone-I water supply scheme in Swarupnagar Block of North 24 Parganas District under Barasat Division, P.H.E Dte. ORD/000035/2023-2024 1357/BD 04/05/2023 695 MAHAVIR PUMPS MANUFACTURING PVT.LTD. 723.95 376.45 48
96 Barasat Division Acceptance cum work order for Additional Laying of UPVC distribution pipe line with restoration works near Gazikhali Sasan in connection with Augmentation of Bermajur w/s scheme, Sandeshkhali-II Block under Hasnabad Sub-Division, PHE Dte. ORD/000035/2025-2026 1525/BD 14/05/2025 30 PRITAM MUKHOPADHYAY. 10.77 0.00 0
97 Barasat Division Formal work order for Laying of DI/UPVC distribution pipe line and Providing Functional House Hold Tap Connection (FHTC) for augmentation of Ghatpatila (Zone-II) Water Supply Scheme under Bongaon Sub-Division, PHE Dte. ORD/000036/2023-2024 1354/BD 04/05/2023 90 PATHIK PABAN NANDI 403.71 370.50 95
98 Barasat Division Acceptance cum work order for Protection works for newly laid different dia. UPVC/DI pipe line at Joygram Molla para N/H/O Salauddin Molla in connection with Augmentation of Malancha w/s scheme (Z-I), Minakhan Block under Hasnabad Sub-Division, PHE Dte. ORD/000036/2025-2026 1528/BD 14/05/2025 21 MD.SALIM GAZI. 10.20 0.00 0
99 Barasat Division Formal work order for Laying of DI/UPVC distribution pipe line and Providing Functional Household Tap Connection for Augmentation of Simla Durgapur Zone-I water supply scheme in Baduria Block under Barasat Division, P.H.E Dte. ORD/000037/2023-2024 1355/BD 04/05/2023 775 CHANCHAL ENTERPRISE & CO. 300.04 248.54 71
100 Barasat Division Formal work order for Laying of DI rising main, DI/UPVC distribution pipe line,Providing Functional Household Tap Connection, Protection works for different dia. UPVC/DI distribution pipeline by UC bullah/Bamboo pile at different places, Construction of 150 cum capacity CWR , pipe connection and cost of pipes, specials, Construction of switch room cum chlorine room with sanitary & water supply arrangement i/c plinth protection at PH No.-1 (Size-5.40x3.60 mtr.) & PH No-2 (Size-3.60x3.00 mtr.) for Chutkia Radhanagar w/s scheme, Minakhan Block under Hasnabad Sub-Division, PHE Dte. ORD/000039/2023-2024 1439/BD 11/05/2023 692 R.K.MANDAL & CO. 290.05 222.19 100
101 Barasat Division Formal work order for Protection work for newly laid UPVC pipe line at different places of Ghoshpur, Kalinagar & Roypur Mouza in connection with retrofitting of Kalinagar w/s scheme (Z-I), Sandeshkhali-I block under Hasnabad Sub- Division P.H.E. Dte. ORD/000040/2023-2024 1358/BD 04/05/2023 30 UMWELT ENGINEER PVT.LTD. 134.62 134.69 100
102 Barasat Division Acceptance cum work order for Construction and installation of MANIFOLD and allied works at OHR site under Augmentation work at Gobindapur W/S Scheme, Bagdah Block within the jurisdiction of Bongaon Sub-Division under Barasat Division, P.H.E. Dte. ORD/000040/2025-2026 1697/BD 23/05/2025 120 M/S B.K.ENTERPRISE. 20.90 0.00 0
103 Barasat Division Formal work order for Protection work for newly laid UPVC pipe line at different places of Gajalia, Putimari & Ghatihara Mouza in connection with retrofitting of Kalinagar w/s scheme (Z-II), Sandeshkhali-I block under Hasnabad Sub- Division P.H.E. Dte. ORD/000041/2023-2024 1359/BD 04/05/2023 30 UMWELT ENGINEER PVT.LTD. 138.59 138.51 59
104 Barasat Division Acceptance cum work order for Construction and installation of MANIFOLD and allied works at OHR site under Augmentation work at Krishnachandrapur W/S Scheme, Bongaon Block within the jurisdiction of Bongaon Sub-Division under Barasat Division, P.H.E. Dte. ORD/000041/2025-2026 1542/BD 15/05/2025 120 B.S.ENTERPRISE. (BASIRHAT) 51.11 0.00 0
105 Barasat Division Formal work order for Protection work for newly laid UPVC pipe line at different places of Dhuchnikhali Mouza, Korakati Mouza, & Monipur Mouza in connection with retrofitting of Joygopalpur w/s scheme, Sandeshkhali-II block under Hasnabad Sub- Division P.H.E. Dte. ORD/000042/2023-2024 1360/BD 04/05/2023 30 ALOK ENTERPRSE. (A UNIT OF SAKET TREXIM PVT.LTD) 117.20 0.00 0
106 Barasat Division Acceptance cum work order for Construction and installation of MANIFOLD and allied works at OHR site under Augmentation work at Malidah W/S Scheme, Bongaon Block within the jurisdiction of Bongaon Sub-Division under Barasat Division, P.H.E. Dte. ORD/000042/2025-2026 1541/BD 15/05/2025 120 NISHITH BANERJEE 31.89 0.00 0
107 Barasat Division Acceptance cum work order for Sinking of 1 no. 250 mm. x 150 mm. dia. 270 mtr deep tube well by D.R. Rig method having 250 mm. dia. 36 mtr. long housing pipe & 150 mm. dia. 30 mtr. long Filter at Pump House No. - 2 of Janaphul water supply scheme within the jurisdiction of Habra Sub-Division, under Barasat Division, P.H.E. Dte. ORD/000043/2023-2024 1407/BD 08/05/2023 30 M/S K.P.PAL. 14.50 13.16 100
108 Barasat Division Acceptance cum work order for Sinking of 1 no. 250 mm. x 150 mm. dia. 270 mtr deep tubewell by D.R. Rig method having 250 mm. dia. 36 mtr. long housing pipe & 150 mm. dia. 30 mtr. long Filter at Head Work Site of Maslandapur water supply scheme (Zone - II) within the jurisdiction of Habra Sub-Division, under Barasat Division, P.H.E. Dte. ORD/000044/2023-2024 1406/BD 08/05/2023 30 ARUN TRADERS 14.49 13.43 100
109 Barasat Division Acceptance cum work order for Sinking of 2 no. 300 mm. x 200 mm. dia. 270 mtr deep tubewell by D.R. Rig method having 300 mm. dia. 36 mtr. long housing pipe & 200 mm. dia. 30 mtr. long Filter at Pump House No. - 1 & 2 of Bira Rajibpur water supply scheme within the jurisdiction of Habra Sub-Division, under Barasat Division, P.H.E. Dte. ORD/000045/2023-2024 1410/BD 08/05/2023 30 M/S K.P.PAL. 39.12 31.66 100
110 Barasat Division Acceptance cum work order for Sinking of 1 no. 250 mm. x 150 mm. dia. 270 mtr deep tubewell by D.R. Rig method having 250 mm. dia. 36 mtr. long housing pipe & 150 mm. dia. 30 mtr. long Filter at Head Work Site of Maslandapur water supply scheme (Zone - I) within the jurisdiction of Habra Sub-Division, under Barasat Division, P.H.E. Dte. ORD/000046/2023-2024 1409/BD 08/05/2023 30 NADIA TUBEWELLS 14.49 12.00 100
111 Barasat Division Acceptance cum work order for Construction and installation of MANIFOLD and allied works at OHR site under Augmentation work at Bagdah W/S Scheme Bagdah block within the jurisdiction of Bongaon Sub-Division under Barasat Division, P.H.E. Dte. ORD/000046/2025-2026 1544/BD 15/05/2025 120 N.H. ENTERPRISE 40.13 0.00 0
112 Barasat Division Acceptance cum work order for Sinking of 2 nos. 250 mm. x 150 mm. dia. 270 mtr deep tubewell by D.R. Rig method having 250 mm. dia. 36 mtr. long housing pipe & 150 mm. dia. 30 mtr. long Filter at Pump House No. - 1 & 2 of Gaighata water supply scheme within the jurisdiction of Habra Sub-Division, under Barasat Division, P.H.E. Dte. ORD/000047/2023-2024 1408/BD 08/05/2023 30 NADIA TUBEWELLS 28.98 25.15 100
113 Barasat Division Formal work order for Laying of DI/UPVC distribution pipe line and Providing Functional Household Tap Connection (FHTC) for augmentation of Gadpukuria (Zone-I) Water Supply Scheme under Bongaon Sub-Division, PHE Dte ORD/000048/2023-2024 1396/BD 08/05/2023 899 M/S DIPAK ENTERPRISE 343.41 259.65 90
114 Barasat Division Hiring 1(One) No. Diesel Luxury Car on Daily basis. (for 6 (six) months from w.e.f. 01.06.2024) for the office use of the Assistant Engineer, Barasat Sub Division, P.H.E. Dte. @ Rs. 475.00 (Rupees four hundred & seventy five only) per day Excluding fuel. (Period for 01/06/2024 to 30/11/2024) ORD/000049/2024-2025 140/BSD 28/05/2024 184 MADHAB CHANDRA DAS 0.87 1.88 0
115 Barasat Division Acceptance cum work order for Protection works for protection of UPVC distribution pipe line at N/H/O Biswajit Ghosh & other places in connection with Augmentation of Hingalganj w/s scheme (Z-II), Hingalganj block under Hasnabad Sub-Division P.H.E. Dte. ORD/000054/2025-2026 1613/BD 19/05/2025 30 ANKUSH CONSTRUCTION & CO. 12.24 0.00 0
116 Barasat Division Acceptance cum work order for Land development at Pump House No-1 in connection with augmentation of Bhabanipur w/s scheme (Z-I), Hasnabad block under Hasnabad Sub-Division P.H.E. Dte. ORD/000055/2025-2026 842/HSD 15/05/2025 10 MD.SALIM GAZI. 1.49 0.00 0
117 Barasat Division Acceptance cum work order for Repairing of 250 cum capacity 20 mtr. staging height R.C.C. Over Head Water Reservoir & other allied work for Augmentation of Asharia Narayanpur water supply scheme, Hasnabad block under Hasnabad Sub-Division, PHE Dte. ORD/000058/2023-2024 1430/BD 11/05/2023 45 B.S.ENTERPRISE. (BASIRHAT) 27.62 26.62 100
118 Barasat Division Special repairing of pipe line at different location of Sankhchura Water Supply Scheme under Basirhat Sub Division, P.H.E. Dte. ORD/000058/2024-2025 914/BHTSD 24/05/2024 7 SOUMIT CONSTRUCTION 0.31 0.31 100
119 Barasat Division Acceptance cum work order for Protection works in different places for protection of different dia DI-UPVC rising/distribution pipe line by UC bullah/bamboo pile for Kachurhula Zone-II w/s scheme, Minakhan block under Hasnabad Sub- Division P.H.E. Dte. ORD/000060/2025-2026 1610/BD 19/05/2025 30 SARKAR ENTERPRISE & CO. 15.55 0.00 0
120 Barasat Division Repairing of damaged concrete road due to laying of Pipe Line in various place of zafarpur pwss under Basirhat Sub-Division, under Barasat Division, PHE Dte. [SM/11585] ORD/000061/2024-2025 916/BHTSD 24/05/2024 7 RAKESH ENTERPRISE. 0.96 0.00 100
121 Barasat Division Acceptance cum work order for Sinking of 1 No. 400.00 mtr. Deep 100 X 50 mm. dia. Trial-cum-production Tube well fitted with Indian Mark - II pump with PVC pipe and strainers at T/W site-1 for Ketarchak w/s scheme, Hingalganj block under Hasnabad Sub-Division, P.H.E. Dte. ORD/000061/2025-2026 844/HSD 19/05/2025 10 M/S GHOSH CONSTRUCTION. 3.39 0.00 0
122 Barasat Division Restoration of sub-base of bituminous road from Node 68 to 63 to 50 to 48 to 34 to 32 to 21 in Gobindapur Dhokra W/S Scheme Under Basirhat Sub-Division P.H.E. Dte.Under Barasat Division, P.H.E.Dte. ORD/000062/2024-2025 917/BHTSD 24/05/2024 7 M/S MAA TARA ENTERPRISE 0.92 0.90 100
123 Barasat Division Acceptance cum work order for Sinking of 1 No. 400.00 mtr. Deep 100 X 50 mm. dia. Trial-cum-production Tube well fitted with Indian Mark - II pump with PVC pipe and strainers at T/W site-1 for Bhanderkhali w/s scheme, Hingalganj block under Hasnabad Sub-Division, P.H.E. Dte. ORD/000062/2025-2026 845-HSD 19/05/2025 10 M/S NIRMAN CONSTRUCTION. 4.15 0.00 0
124 Barasat Division Restoration of sub-base of bituminous road from Node 40 to 2 to 65 to 62 to 68 in Gobindapur Dhokra W/S Scheme Under Basirhat Sub-Division P.H.E. Dte.Under Barasat Division, P.H.E.Dte. ORD/000063/2024-2025 918/BHTSD 24/05/2024 7 M/S MAA TARA ENTERPRISE 0.64 0.62 100
125 Barasat Division Formal work order for Withdrawing, relaying and laying of different dia. UPVC/DI pipe line at Bangali para, near cyclone centre, Sahaji para, shayam molla para, Barik para, Ghorami para etc of Jhupkhali and Nazat BDO office, Metekhali, Parsemari & other tail end areas of Boyermari Abad to improve functionality under Khariat Abad w/s scheme under Hasnabad Sub-Division, P.H.E.Dte. ORD/000065/2025-2026 1749/BD 28/05/2025 120 CHANCHAL ENTERPRISE & CO. 177.38 0.00 0
126 Barasat Division Formal work order for Additional Laying of UPVC distribution pipe line, Providing FHTC for the leftout portion, leftout work of 500 cum reservoir in connection with Augmentation of Chandpur w/s scheme (Z-II), Hasnabad Block, Construction of Protection wall for protection of UPVC distribution pipe line, Construction of approach road Zone-5 of Surfaced based w/s scheme Hasnabad, Protection works in different location of Amberia and Ghuni mouza, 2 nos. pump connection at PH No.-1 & 2 with CWR in connection within Amberia water supply scheme, Hingalganj block under Hasnabad Sub-Division, PHE Dte. ORD/000066/2025-2026 1748/BD 28/05/2025 60 M/S DATTA ENTERPRISE. 102.67 0.00 80
127 Barasat Division Formal work order for Additional Laying of UPVC distribution pipe line, Providing FHTC for the leftout portion, protection works & other allied works in connection with Augmentation of Durgamandop w/s scheme, Sandeshkhali-II Block under Hasnabad Sub-Division, PHE Dte. ORD/000067/2025-2026 1753/BD 28/05/2025 60 MONDAL & CO. (BASIRHAT). 251.97 0.00 0
128 Barasat Division Acceptance cum work order for Protection of newly laid UPVC pipe line for providing FHTC by bamboo pilling at different places of Bashberia within Baunia Abad w/s scheme, Sandeshkhali-II block under Hasnabad Sub- Division P.H.E. Dte. ORD/000069/2022-2023 785/HSD 13/05/2022 10 M/S DATTA ENTERPRISE. 4.85 4.83 1
129 Barasat Division Formal work order for Additional laying of UPVC distribution pipe line including protection work for DI pipe at N/H/O Provas Halder towards Suvomay Mondal house & other allied work for UPVC pipe laying at different places in connection with Augmentation of Sahebkhali w/s scheme (Z-I), Hingalganj block within Hasnabad Sub-Division under Barasat Division P.H.E. Dte. ORD/000069/2025-2026 1797/BD 30/05/2025 60 SAHA CONSTRUCTION & CO 139.89 0.00 0
130 Barasat Division Formal work order for Laying of DI/UPVC distribution pipe line and providing FHTC (Functional Household Tap Connection) for Augmentation of Parui Zone-I water supply scheme in Swarupnagar Block under Barasat Division, P.H.E Dte. ORD/000073/2023-2024 1440/BD 11/05/2023 90 SANJIB DEY 113.91 109.50 60
131 Barasat Division Acceptance cum work order for Construction of Boundary wall, Approach Road and plinth protection of Pump House at Head Work site of Gobindapur Water Supply Scheme, Bagdah Block within the jurisdiction of Bongaon Sub-Division under Barasat Division, P.H.E. Dte. ORD/000073/2025-2026 1769/BD 29/05/2025 120 RAKESH ENTERPRISE. 24.50 0.00 0
132 Barasat Division Acceptance cum work order for Special Repairing work in connection with augmentation work at total command area of Chikanpara Water Supply Scheme, to repair the damaged pipeline due to road widening and drain construction, to extend the Backwash line and also to convert the mouzas into Swajal Gram within Bongaon Sub Division, under Barasat Division, P.H.E.Dte. ORD/000074/2025-2026 1904/BD 05/06/2025 120 MA CONSTRUCTION. 13.57 0.00 0
133 Barasat Division Supply of Sluice valve (200 mm) including construction of Sluice valve chamber for Augmentation of Dakshin Chatra Zone-I Water Supply Scheme under Basirhat Sub Division , P.H.E. Dte. under Barasat Division, P.H.E. Dte. ORD/000075/2024-2025 928/BHTSD 24/05/2024 7 ROHAN MONDAL. 0.97 0.97 100
134 Barasat Division Acceptance cum work order for Special Repairing work in connection with augmentation work at total command area of Ichhapur Water Supply Scheme, to repair the damaged pipeline due to road widening and drain construction and also to convert the mouzas into Swajal Gram within Bongaon Sub Division, under Barasat Division, P.H.E.Dte. ORD/000075/2025-2026 1905/BD 05/06/2025 120 ROY ENGINEERS. 16.43 0.00 0
135 Barasat Division Acceptance cum work order for Construction of approach road with cement concrete at PH No.-3 within Joygopalpur w/s scheme, Sandehkhali-II block under Hasnabad Sub-Division P.H.E. Dte. ORD/000076/2022-2023 792/HSD 13/05/2022 10 UNIFIED ENGINEERS' CO-OPERATIVE SOCIETYLTD. 0.80 0.00 1
136 Barasat Division Acceptance cum work order for Construction of Boundary wall at Head Work site for Augmentation of Ichhapur Water Supply Scheme, Gaighata Block within the jurisdiction of Bongaon Sub-Division under Barasat Division, P.H.E.Dte. ORD/000076/2025-2026 1770/BD 29/05/2025 240 SONALI CONSTRUCTION 21.51 0.00 0
137 Barasat Division Acceptance cum work order for Repairing & renovation of Boundary wall, Earth Filling, Concreting and Repairing & renovation of 3.60 mtr. X 3.00 mtr. size Pump House with sanitary and water supply arrangement at 2nd TW Site of Helencha Water Supply Scheme, Bagdah Block within the jurisdiction of Bongaon Sub-Division under Barasat Division, P.H.E. Dte. ORD/000077/2025-2026 1902/BD 05/06/2025 120 KAMAL HALDER. 10.52 0.00 0
138 Barasat Division Acceptance cum work order for Construction of switch room cum chlorine room with sanitary and water supply arrangement including plinth protection at PH No.-1 (Size-5.40x3.60 mtr.) & PH No.-2 (Size-3.60x3.00 mtr.) for Augmentation of Chandpur w/s scheme (Z-II), Hasnabad block under Hasnabad Sub-Division, P.H.E. Dte. ORD/000078/2023-2024 1429/BD 11/05/2023 60 PRITAM MUKHOPADHYAY. 17.32 17.14 85
139 Barasat Division Acceptance cum work order for Providing Functional Household Tap Connection (FHTC) to the uncovered household as well as convert the mouzas into Swajal Gram including laying of UPVC pipe and Tube well connection under Augmentation work at Ghatpatila W/S Scheme (Zone - I), Bagdah block within the jurisdiction of Bongaon Sub-Division under Barasat Division, P.H.E. Dte. ORD/000078/2024-2025 1770/BD 01/07/2024 315 ROY CHOWDHURY CONSTRUCTION. 22.88 7.37 100
140 Barasat Division Laying of HDPE pipe line and Repairing of DI pipelines including supply of Sluice valve (200 mm) for interconnection of AIRP under Augmentation work of Dakshin Chatra Zone-I Water Supply Scheme under Basirhat Sub Division , P.H.E. Dte. under Barasat Division, P.H.E. Dte. ORD/000079/2024-2025 929/BHTSD 24/05/2024 7 S.R.M. ENTERPRISE. 1.00 1.00 100
141 Barasat Division Acceptance cum work order for Restoration of existing pipe line and additional laying with UPVC pipe and allied works under Augmentation work at Bharatpur W/S Scheme, Bongaon block within the jurisdiction of Bongaon Sub-Division under Barasat Division, P.H.E. Dte. ORD/000079/2025-2026 2052/BD 20/06/2025 120 ONKAR ENTERPRISE. 9.65 0.00 100
142 Barasat Division Acceptance cum work order for Construction of switch room cum chlorine room with sanitary and water supply arrangement including plinth protection at PH No.-1 (Size-5.40x3.60 mtr.) & PH No.-2 (Size-3.60x3.00 mtr.) for Augmentation of Barunhat Patlikhanpur w/s scheme (Z-II), Hasnabad block under Hasnabad Sub-Division, P.H.E. Dte. ORD/000080/2023-2024 1428/BD 11/05/2023 60 JESMINE ENTERPRISE. 17.34 17.15 100
143 Barasat Division Special Repairing of DI pipe, Supply of Sluice valve & construction of Sluice valve chamber for Augmentation of Dhanyakuria Water Supply Scheme in Basirhat-II block of North 24 Parganas district under Barasat Division, P.H.E. Dte. ORD/000080/2024-2025 935/BHTSD 24/05/2024 7 ANKUSH CONSTRUCTION & CO. 0.88 0.00 0
144 Barasat Division Acceptance cum work order for Connection of 1 no. newly sunk Replaced Tube well with rising main by DI pipe, additional laying of pipe line with UPVC pipe due to damage of existing pipe line and allied works for Augmentation of Panchita W/S Scheme, Bongaon Block within the jurisdiction of Bongaon Sub-Division under Barasat Division, P.H.E. Dte. ORD/000080/2025-2026 1903/BD 05/06/2025 120 PRABIR KUMAR MONDAL. 15.49 0.00 0
145 Barasat Division Formal work order for Providing Functional Household Tap Connection (FHTC) in connection with Jal Jeevan Mission (JJM) and Jal Swapna programme within command area of Daudpur w/s scheme, Sandeshkhali-II block under Hasnabad Sub-Division, PHE Dte. ORD/000081/2022-2023 1492/BD 25/05/2022 90 M/S S.S.ENTERPRISE. (SOUTH) 164.51 125.08 1
146 Barasat Division Special Repairing of existing HDPE & UPVC pipelines for Augmentation of Dhanyakuria Water Supply Scheme in Basirhat-II block of North 24 Parganas district under Barasat Division, P.H.E. Dte. ORD/000081/2024-2025 936/BHTSD 24/05/2024 7 ANKUSH CONSTRUCTION & CO. 0.98 0.00 0
147 Barasat Division Installation of CCTV Camera Connection at Pump house no 1 & 2 for Bongaon S.D. Hospital w/s scheme, Bongaon Block under Bongaon Sub-Division, PHE Dte. ORD/000081/2025-2026 532/Bon 22/04/2025 7 ELDORADO 0.55 0.00 0
148 Barasat Division Formal work order for Providing Functional Household Tap Connection (FHTC) in connection with Jal Jeevan mission (JJM and Jal Swapna) within command area of Kalinagar (Zone-II) W/S Scheme, Sandeshkhali-I Block, Dist. - North 24 Parganas under Hasnabad Sub-Division, PHE. Dte. ORD/000082/2022-2023 1506/BD 26/05/2022 90 UMWELT ENGINEER PVT.LTD. 208.93 199.91 47
149 Barasat Division Installation of CCTV Camera Connection at Pump house no 1 & 2 for Chhaygharia (Zone-I) w/s scheme, Bongaon Block under Bongaon Sub-Division, PHE Dte. ORD/000082/2025-2026 533/Bon 22/04/2025 7 ELDORADO 0.55 0.00 0
150 Barasat Division Formal work order for Providing Functional Household Tap Connection (FHTC) in connection with Jal Jeevan Mission (JJM) and Jal Swapna Programme within command area of Rampur w/s scheme, Sandeshkhali-II block under Hasnabad Sub-Division, PHE Dte. ORD/000083/2022-2023 1539/BD 30/05/2022 90 S.S.ENTERPRISE. (BAMANGACHI) 158.70 155.05 1
151 Barasat Division Installation of CCTV Camera Connection at Pump house no 1 & 2 for Chhaygharia (Zone-II) w/s scheme, Bongaon Block under Bongaon Sub-Division, PHE Dte. ORD/000083/2025-2026 538/Bon 23/04/2025 7 ELDORADO 0.55 0.00 0
152 Barasat Division Installation of CCTV Camera Connection at Pump house no 1 & 2 for Chhaygharia (Zone-III) w/s scheme, Bongaon Block under Bongaon Sub-Division, PHE Dte. ORD/000084/2025-2026 539/Bon 23/04/2025 7 ELDORADO 0.55 0.00 0
153 Barasat Division Formal work order for Providing Functional Household Tap Connection (FHTC) in connection with Jal Jeevan Mission (JJM) and Jal Swapna Programme within command area of Laukhali W/s scheme Sandeshkhali-I block under Hasnabad Sub-Division, PHE Dte. ORD/000085/2022-2023 1569/BD 01/06/2022 90 M/S S.S.ENTERPRISE. (SOUTH) 250.04 186.86 100
154 Barasat Division Acceptance cum work order for Providing Functional Household Tap Connection (FHTC) to the uncovered household as well as convert the mouzas into Swajal Gram including laying of UPVC pipe and tube well connection under Augmentation work at Sindrani W/S Scheme (Zone - I) Bagdah block within the jurisdiction of Bongaon Sub-Division under Barasat Division, P.H.E. Dte. ORD/000085/2024-2025 1766/BD 01/07/2024 15 ONKAR ENTERPRISE. 19.03 0.00 100
155 Barasat Division Formal work order for Providing Functional Household Tap Connection (FHTC) in connection with Jal Jeevan Mission (JJM) and Jal Swapna Programme within command area of Kalinagar W/s scheme (Zone-I), Sandeshkhali-I block under Hasnabad Sub-Division, PHE Dte. ORD/000086/2022-2023 1570/BD 01/06/2022 90 UMWELT ENGINEER PVT.LTD. 274.51 255.99 1
156 Barasat Division Formal work order for Providing Functional Household Tap Connection (FHTC) in connection with Jal Jeevan Mission (JJM) and Jal Swapna Programme within command area of Tushkhali W/s scheme, Sandeshkhali-II block under Hasnabad Sub-Division, PHE Dte. ORD/000087/2022-2023 1604/BD 07/06/2022 90 J.D.J.ENTERPRISE. (TRADERS PVT.LTD) 183.73 164.74 0
157 Barasat Division Eucalyptus Bullah Piling for Emergency protection Work of Pipe line at Chak Farasatpur Mouza between Node Number 123 & 124 of Gobindapur Dhokra Water Supply Scheme under Basirhat Sub Division under Barasat Division P.H.E. Dte. (Length of Piling Work = 33) ORD/000087/2024-2025 938/BHTSD 24/05/2024 7 PRASANTA KUMAR PAUL. 0.98 0.00 0
158 Barasat Division Formal work order for Providing Functional Household Tap Connection (FHTC) in connection with Jal Jeevan Mission (JJM) and Jal Swapna Programme within command area of Jeliakhali Purba Khanda W/s scheme, Sandeshkhali-II block under Hasnabad Sub-Division, PHE Dte. ORD/000088/2022-2023 1605/BD 07/06/2022 90 SUBHASH BOSE. 126.81 120.92 1
159 Barasat Division Eucalyptus Bullah Piling for Emergency protection Work of Pipe line at Ramnarayanpur Mouza between Node Number 27 & 29 of Gobindapur Dhokra Water Supply Scheme under Basirhat Sub Division under Barasat Division P.H.E. Dte. (Length of Piling Work = 30) ORD/000089/2024-2025 939/BHTSD 24/05/2024 7 J.D.ENTERPRISE. (BASIRHAT) 0.91 0.00 0
160 Barasat Division Acceptance cum work order for Construction of switch room cum chlorine room with sanitary and water supply arrangement including plinth protection at PH No.-1 (Size-5.40x3.60 mtr.) & PH No.-2 (Size-3.60x3.00 mtr.) for Augmentation of Mohanpur w/s scheme (Z-II), Minakhan block under Hasnabad Sub-Division, P.H.E. Dte. ORD/000090/2023-2024 1441/BD 11/05/2023 60 ROYAL CONSTRUCTION 16.03 15.09 62
161 Barasat Division Formal work order for Protection work in different places of Jeliakhali Mouza in connection with retrofitting of Jeliakhali Purba Khanda w/s scheme, Sandeshkhali-II block under Hasnabad Sub- Division P.H.E. Dte. ORD/000091/2023-2024 1496/BD 17/05/2023 30 SUBHASH BOSE. 137.02 135.82 100
162 Barasat Division Eucalyptus Bullah Piling for Emergency protection Work of Pipe line at Ramnarayanpur Mouza between Node Number 27 & 28 of Gobindapur Dhokra Water Supply Scheme under Basirhat Sub Division under Barasat Division P.H.E. Dte. (Length of Piling Work = 24) ORD/000091/2024-2025 940/BHTSD 24/05/2024 7 SELIM GAZI. 0.73 0.73 100
163 Barasat Division Formal work order for Laying of Rising main & distribution pipe line by DI & UPVC and providing FHTC for augmentation of Donnagar Water Supply Scheme under Barasat Sub Division, P.H.E. Dte. ORD/000092/2023-2024 1531/BD 19/05/2023 681 M/S S. & P CONSTRUCTION 147.04 76.92 20
164 Barasat Division Formal work order for Providing Functional Household Tap Connection (FHTC) in connection with Jal Jeevan Mission (JJM) and Jal Swapna Programme within command area of Jhupkhali w/s scheme, Sandeshkhali-II block under Hasnabad Sub-Division, PHE Dte. ORD/000093/2022-2023 1617/BD 07/06/2022 90 RADIANT 124.77 123.97 0
165 Barasat Division Formal work order for Laying of DI rising main, DI/UPVC distribution pipe line,Providing Functional Household Tap Connection, Protection works for different dia. UPVC/DI distribution pipeline by UC bullah/Bamboo pile at different places, Construction of 100 cum capacity CWR , pipe connection and cost of pipes, specials, Construction of switch room cum chlorine room with sanitary & water supply arrangement i/c plinth protection at PH No.-1 (Size-5.40x3.60 mtr.) & PH No-2 (Size-3.60x3.00 mtr.) for Kachurhula w/s scheme (Z-II), Minakhan Block under Hasnabad Sub-Division, PHE Dte. ORD/000093/2023-2024 1524/BD 19/05/2023 958 ROY CHOWDHURY CONSTRUCTION. 147.05 135.53 96
166 Barasat Division Acceptance cum work order for Sinking of 1(one) no. 300mm x 200 mm. dia. Tube well 250 mtr deep by D.R. method with UPVC pipe & UPVC ribbed strainer at Chhaighoria (Zone-II) water supply scheme (2nd T/W Site) under Bongaon Sub-Division P.H.E.Dte. ORD/000095/2023-2024 1545/BD 19/05/2023 30 NEW MA TARA ENTERPRISE. 15.85 13.47 100
167 Barasat Division Acceptance cum work order for Emergent restoration of different dia UPVC pipe line for damage portion at different places due widening of PWD road of Hingalganj w/s Scheme (Zone-I), Hingalganj block under Hasnasbad Sub-Division, P.H.E.Dte. ORD/000096/2022-2023 914/HSD 07/06/2022 15 MONDAL & CO. (BASIRHAT). 4.90 4.90 1
168 Barasat Division Acceptance cum work order for Sinking of 1(one) no. 300mm x 200 mm. dia. Tube well 250 mtr deep by D.R. method with UPVC pipe & UPVC ribbed strainer at Chhaighoria (Zone-III) water supply scheme (2nd T/W Site) under Bongaon Sub-Division P.H.E.Dte. ORD/000096/2023-2024 1546/BD 22/05/2023 30 NEW MA TARA ENTERPRISE. 15.81 10.08 100
169 Barasat Division Acceptance cum work order for Sinking of 1(one) no. 300mm x 200 mm. dia. Tube well 250 mtr deep by D.R. method with UPVC pipe & UPVC ribbed strainer at Ghatpatila (Zone-I) water supply scheme (Head Work Site) under Bongaon Sub-Division P.H.E.Dte. Part-A ORD/000097/2023-2024 1548/BD 22/05/2023 30 SAHA CONSTRUCTION & CO 16.16 13.69 100
170 Barasat Division Formal work order for Additional Laying of DI/UPVC distribution pipe line and Providing Functional Household Tap Connection for the left out portion in connection with Augmentation of Baruhat Patlikhanpur water supply scheme (Z-I), Hasnabad Block of Hasnabad Sub-Division, P.H.E Dte. ORD/000097/2024-2025 1735/BD 27/06/2024 90 MONDAL & CO. (BASIRHAT). 107.74 69.79 70
171 Barasat Division Acceptance cum work order forSinking of 1(one) no. 300mm x 200 mm. dia. Tube well 250 mtr deep by D.R. method with UPVC pipe & UPVC ribbed strainer at Ghatpatila (Zone-I) water supply scheme (2nd T/W Site) under Bongaon Sub-Division P.H.E.Dte.-- Part- B ORD/000098/2023-2024 1547/BD 22/05/2023 30 SAHA CONSTRUCTION & CO 16.17 13.75 100
172 Barasat Division Formal work order for Additional Laying of UPVC distribution pipe line and Providing Functional Household Tap Connection for the leftout portion in connection with Augmentation of Kanaikathi Kathalberia water supply scheme (Z-II), Hingalganj Block under Hasnabad Sub-Division, PHE Dte. ORD/000098/2024-2025 1717/BD 26/06/2024 271 KINGS & CO. 148.51 41.13 80
173 Barasat Division Formal work order for Laying of DI rising main, DI/UPVC distribution pipe line,Providing Functional Household Tap Connection, Protection works for different dia. UPVC/DI distribution pipeline by UC bullah/Bamboo pile at different places, Construction of 200 Cum capacity 20 mtr staging height R.C.C Over Head water Reservoir as per Departmental design, drawing and specification including bored pile & pile cap, Construction of switch room cum chlorine room with sanitary & water supply arrangement i/c plinth protection at PH No.-1 (Size-5.40x3.60 mtr.) & PH No-2 (Size-3.60x3.00 mtr.) for Niruli w/s scheme, Minakhan Block under Hasnabad Sub-Division, PHE Dte. ORD/000099/2023-2024 1544/BD 22/05/2023 863 DEBAPRASAD MONDAL. 348.43 271.88 85
174 Barasat Division Formal work order for Additional Laying of UPVC distribution pipe line and Providing Functional Household Tap Connection for the leftout portion with protection work in connection with Augmentation of Durgapur Baylani water supply scheme (Z-I & II), Hingalganj Block of Hasnabad Sub-Division under Barasat Division, PHE Dte. ORD/000100/2024-2025 2401/BD 22/08/2024 270 M/S S.C. CIVIL ENTERPRISES 116.00 0.00 0
175 Barasat Division Acceptance cum work order for Emergent resting of old rising main pipeline with UC Bullah pilling at Kalitala Bazar at Kalitala mouza within Kalitala w/s scheme, Hingalganj block under Hasnabad Sub- Division P.H.E. Dte. ORD/000103/2025-2026 930/HSD 29/05/2025 10 CHANCHAL ENTERPRISE & CO. 0.82 0.00 0
176 Barasat Division Acceptance cum work order for Construction of Pump House with latrine at Joypul water Supply Scheme under Barasat-I Block size of 5.40m x 3.60m within Barasat Sub Division, P.H.E.Dte. ORD/000106/2024-2025 1922/BD 09/07/2024 184 CHAKRABORTY SUPPLIERS & CONSTRUCTION. 5.09 0.00 100
177 Barasat Division Formal work order for Additional pipeline and other allied works as per revised LDS in connection with Augmentation of Chandrapur Water Supply Scheme under JJM programme in Barasat-I block within Barasat Sub Division, P.H.E.Dte. ORD/000107/2024-2025 2004/BD 18/07/2024 450 KINGS & CO. 682.84 100.00 34
178 Barasat Division Continuation work order for Hiring 1(one) no. Diesel Luxary Car on daily basis (for 01.05.2023 to 31.08.2023) for office use of the Assistant Engineer, R.W.S Barasat Sub-Division, P.H.E. Dte ORD/000108/2023-2024 382/BST 27/04/2023 123 DEBAPRASAD MONDAL. 0.58 1.03 0
179 Barasat Division Formal work order for Additional pipeline and other allied works as per revised LDS in connection with Augmentation of Bodai-I Water Supply Scheme under JJM programme in Amdanga block within Barasat Sub Division, P.H.E.Dte. ORD/000108/2024-2025 2580/BD 05/09/2024 90 A.P POWER & CONCRETE 325.89 0.00 0
180 Barasat Division Formal work order for Protection work for newly laid UPVC pipe line at different places of Rampur & Dhamakhali Mouza in connection with retrofitting of Rampur w/s scheme, Sandeshkhali-II block under Hasnabad Sub- Division P.H.E. Dte. ORD/000109/2023-2024 1670/BD 06/06/2023 30 S.S.ENTERPRISE. (BAMANGACHI) 115.27 115.23 60
181 Barasat Division Formal work order for Construction of 200 cum capacity CWR with pipe connection, Construction of Boundary wall, Approach Road, Earth Filling, Construction of 5.40 mtr. X 3.60 mtr. size Switch Room with sanitary and water supply arrangement and Laying of DI/UPVC distribution pipe line, Providing Functional Household Tap Connection, Protection works for different dia. UPVC/DI distribution pipeline by UC bullah pile at different places at Diara (Zone-II) Water Supply Scheme in connection with surface water based water supply scheme of Bongaon-Bagdah in the District of North 24 Parganas under Bagdah Block within the jurisdiction of Bongaon Sub-Division under Barasat Division, P.H.E. Dte. ORD/000109/2024-2025 2222/BD 07/08/2024 270 ROY CHOWDHURY CONSTRUCTION. 108.24 23.30 60
182 Barasat Division Acceptance cum work order for Sand filling at ditch area for construction of temporary approach road for movement of winch machine and other allied machineries at OHR site within Malancha W/S scheme (Z-II), Minakhan block under Hasnabad Sub-Division P.H.E. Dte. ORD/000109/2025-2026 936/HSD 29/05/2025 10 M/S R.B.S.ENTERPRISE. 0.96 0.00 0
183 Barasat Division Formal work order for Laying of DI/UPVC distribution pipe line and Providing Functional House Hold Tap Connection (FHTC) for Augmentation of Sadpur Water Supply Scheme within the jurisdiction of Habra Sub-Division under Barasat Division, P.H.E. Dte. ORD/000110/2023-2024 1669/BD 06/06/2023 90 B.M.ENTERPRISE. 105.99 43.32 80
184 Barasat Division Formal work order for Providing Functional House Hold Tap Connection (FHTC) from existing and new proposed distribution system with in command area at Sindrani (Zone-II) Water Supply Scheme under Bongaon Sub-Division, PHE Dte.(Augmentation). ORD/000111/2022-2023 1649/BD 09/06/2022 90 MONDAL ENTERPRISE. (BARASAT) 324.72 324.48 1
185 Barasat Division Formal work order for Construction of Ground Level Clear Water Reservoir (Capacity 250 Cum) and High Lift Pump House including allied works in Connection to augmentation of Mathurabill surface based water supply scheme at Zone- I, II & III within Barrackpore Block in the district of North 24 Parganas under Barasat Division, P.H.E Dte. ORD/000112/2024-2025 2099/BD 26/07/2024 340 M/S B.K.ENTERPRISE. 235.53 8.20 37
186 Barasat Division Acceptance cum work order for Additional land development for connecting road at tube well site-1 (H/W site) within Nityabaria w/s scheme, Sandeshkhali-I under Hasnabad Sub-Division P.H.E. Dte. ORD/000113/2022-2023 930/HSD 07/06/2022 21 M/S DATTA ENTERPRISE. 2.01 2.01 1
187 Barasat Division Acceptance cum work order for Additional land development at tube well site-1 (H/W site) within Nityabaria w/s scheme, Sandeshkhali-I under Hasnabad Sub-Division P.H.E. Dte. ORD/000114/2022-2023 931/HSD 07/06/2022 21 M/S PROGATI ENTERPRISE. 4.53 4.53 1
188 Barasat Division Formal work order for Laying of DI rising main, DI/UPVC distribution pipe line, Providing Functional Household Tap Connection, Protection works for different dia. UPVC/DI distribution pipeline by UC bullah/Bamboo pile at different places, Construction of 100 cum capacity CWR, pipe connection and cost of pipes, specials, Construction of switch room cum chlorine room with sanitary & water supply arrangement i/c plinth protection at PH No.-1 (Size-5.40x3.60 mtr.) & PH No-2 (Size-3.60x3.00 mtr.) for Bachhra w/s scheme, Minakhan Block under Hasnabad Sub-Division, PHE Dte. ORD/000115/2023-2024 1690/BD 07/06/2023 366 R.K.MANDAL & CO. 267.07 223.92 85
189 Barasat Division Acceptance cum work order for 1 no. pump connection at PH No.-3 in connection within Mallickgheri water supply scheme , Minakhan block under Hasnabad Sub-Division, P.H.E. Dte. ORD/000115/2025-2026 942/HSD 29/05/2025 10 M/S DATTA ENTERPRISE. 0.72 0.00 0
190 Barasat Division Formal work order for Laying of DI rising main, DI/UPVC distribution pipe line, Providing Functional Household Tap Connection, Protection works for different dia. UPVC/DI distribution pipeline by UC bullah/Bamboo pile at different places, Construction of 100 cum capacity CWR, pipe connection and cost of pipes, specials, Construction of switch room cum chlorine room with sanitary & water supply arrangement i/c plinth protection at PH No.-1 (Size-5.40x3.60 mtr.) & PH No-2 (Size-3.60x3.00 mtr.) for Pipuldaha w/s scheme, Minakhan Block under Hasnabad Sub-Division, PHE Dte. ORD/000116/2023-2024 1684/BD 07/06/2023 366 GHOSH CONSTRUCTION. 205.49 132.74 75
191 Barasat Division Formal work order for Laying of DI rising main, DI/UPVC distribution pipe line, Providing Functional Household Tap Connection, Protection works for different dia. UPVC/DI distribution pipeline by UC bullah/Bamboo pile at different places, Construction of 150 cum capacity CWR , pipe connection and cost of pipes, specials, Construction of switch room cum chlorine room with sanitary & water supply arrangement i/c plinth protection at PH No.-1 (Size-5.40x3.60 mtr.) & PH No-2 (Size-3.60x3.00 mtr.) for Phulbari Abad w/s scheme, Minakhan Block under Hasnabad Sub-Division, PHE Dte. ORD/000117/2023-2024 1691/BD 07/06/2023 366 M/S B.K.ENTERPRISE. 252.21 220.08 80
192 Barasat Division Formal work order for Protection work in different places of Bhangatushkhali Mouza in connection with retrofitting of Bhangatushkhali w/s scheme, Sandeshkhali-II block under Hasnabad Sub- Division P.H.E. Dte. ORD/000119/2023-2024 1697/BD 08/06/2023 30 AMAL DUTTA ROY 167.81 150.24 100
193 Barasat Division Formal work order for Laying of DI rising main, DI/UPVC distribution pipe line, Providing Functional Household Tap Connection, Protection works for different dia. UPVC/DI distribution pipeline by UC bullah/Bamboo pile at different places, Construction of 100 cum capacity CWR, pipe connection and cost of pipes, specials, Construction of switch room cum chlorine room with sanitary & water supply arrangement i/c plinth protection at PH No.-1 (Size-5.40x3.60 mtr.) & PH No-2 (Size-3.60x3.00 mtr.) for Niruli Abad w/s scheme, Minakhan Block under Hasnabad Sub-Division, PHE Dte. ORD/000120/2023-2024 1692/BD 07/06/2023 1092 UNIFIED ENGINEERS' CO-OPERATIVE SOCIETYLTD. 188.07 118.53 58
194 Barasat Division Formal work order for Laying of DI rising main, DI/UPVC distribution pipe line, Providing Functional Household Tap Connection, Protection works for different dia. UPVC/DI distribution pipeline by UC bullah/Bamboo pile at different places, Construction of 200 Cum capacity 20 mtr staging height R.C.C Over Head water Reservoir as per Departmental design, drawing and specification including bored pile & pile cap, Construction of switch room cum chlorine room with sanitary & water supply arrangement i/c plinth protection at PH No.-1 (Size-5.40x3.60 mtr.) & PH No-2 (Size-3.60x3.00 mtr.) for Tapla Kusangra w/s scheme, Minakhan Block under Hasnabad Sub-Division, PHE Dte. ORD/000122/2023-2024 1682/BD 07/06/2023 1029 SRI KRISHNA CO-OP-LABOUR CONTRACT AND CONST SOC LTD. 328.77 222.42 80
195 Barasat Division Acceptance cum work order for Emergent restoration of concrete road for damage portion at different places for providing FHTC within Rupmari w/s scheme (Zone-III to VI), Hingalganj block under Hasnabad Sub-Division P.H.E. Dte. ORD/000125/2022-2023 940/HSD 07/06/2022 15 M/S DATTA ENTERPRISE. 3.08 3.08 1
196 Barasat Division Acceptance cum work order for Withdrawing & relaying of 75 mm dia. HDPE pipe line from near Halda High School towards Kumirmari kheya Ghat for damage portion within Rupmari W/S Scheme (Z-III & IV), Hingalganj block under Hasnasbad Sub-Division, P.H.E.Dte. ORD/000126/2022-2023 941/HSD 07/06/2022 10 M/S PROGATI ENTERPRISE. 4.92 4.92 1
197 Barasat Division Formal work order for Laying of DI rising main, DI/UPVC distribution pipe line, Providing Functional Household Tap Connection, Protection works for different dia. UPVC/DI distribution pipeline by UC bullah/Bamboo pile at different places, Construction of 100 cum capacity CWR, pipe connection and cost of pipes, specials, Construction of switch room cum chlorine room with sanitary & water supply arrangement i/c plinth protection at PH No.-1 (Size-5.40x3.60 mtr.) & PH No-2 (Size-3.60x3.00 mtr.) for Kachurhula w/s scheme (Z-I), Minakhan Block under Hasnabad Sub-Division, PHE Dte. ORD/000126/2023-2024 1693/BD 07/06/2023 731 TRISHA ENTERPRISE & CO. 166.10 72.97 16
198 Barasat Division Formal work order for Laying of DI/UPVC distribution pipe line and providing Functional Household Tap Connection for Augmentation of Gokna Zone-I B water supply scheme in Baduria Block under Barasat Division, P.H.E Dte. ORD/000128/2023-2024 1694/BD 08/06/2023 683 SUPRITI ENTERPRISE. 581.97 225.80 20
199 Barasat Division Formal work order for Laying of DI/UPVC distribution pipe line and providing Functional Household Tap Connection for Augmentation of Aturia (Zone-I) water supply scheme in Baduria Block under Barasat Division, P.H.E Dte. ORD/000130/2023-2024 1702/BD 08/06/2023 876 EFFLUENT & WATERTREATMENT ENGINEERS (P) LTD. 546.47 462.60 41
200 Barasat Division Formal work order for Laying of DI/UPVC distribution pipe line and providing Functional Household Tap Connection for Augmentation of (Bajitpur Zone-I A) water supply scheme in Baduria Block under Barasat Division, P.H.E Dte. ORD/000133/2023-2024 1709/BD 08/06/2023 630 UTPAL CONSTRUCTION & CO. 356.76 117.56 42
201 Barasat Division Formal work order for Laying of DI/UPVC distribution pipe line and providing Functional Household Tap Connection for Augmentation of Sankchura water supply scheme in Basirhat-I Block under Barasat Division, P.H.E Dte. ORD/000134/2023-2024 1708/BD 08/06/2023 723 UTPAL CONSTRUCTION & CO. 444.98 311.93 50
202 Barasat Division Formal work order for Laying of DI/UPVC distribution pipe line and providing Functional Household Tap Connection for Augmentation of Bithari Zone-II A water supply scheme in Swarupnagar Block under Barasat Division, P.H.E Dte. ORD/000136/2023-2024 1710/BD 08/06/2023 629 UTPAL CONSTRUCTION & CO. 234.15 177.81 50
203 Barasat Division Acceptance cum work order for Renovation of Iron Elimination Plant at Taranipur zone - I W/S Scheme (50.0 m3/hr) at Swarupnagar Block and Akhipur W/S Scheme (33.375m3/hr) at Basirhat - II Block under Basirhat Sub division, PHE Dte of Barasat Division PHE Dte. ORD/000137/2025-2026 2022/BD 18/06/2025 120 EFFLUENT & WATERTREATMENT ENGINEERS (P) LTD. 19.65 0.00 70
204 Barasat Division Formal work order for Laying of DI rising main, DI/UPVC distribution pipe line, Providing Functional Household Tap Connection, Protection works for different dia. UPVC/DI distribution pipeline by UC bullah/Bamboo pile at different places, Construction of 250 Cum capacity 20 mtr staging height R.C.C Over Head water Reservoir as per Departmental design, drawing and specification including bored pile & pile cap, Construction of switch room cum chlorine room with sanitary & water supply arrangement i/c plinth protection at PH No.-1 (Size-5.40x3.60 mtr.) & PH No-2 (Size-3.60x3.00 mtr.) for Debitala w/s scheme, Minakhan Block under Hasnabad Sub-Division, PHE Dte. ORD/000137/2023-2024 1703/BD 08/06/2023 911 SRI KRISHNA CO-OP-LABOUR CONTRACT AND CONST SOC LTD. 399.18 306.61 86
205 Barasat Division Formal work order for Laying of DI rising main, DI/UPVC distribution pipe line, Providing Functional Household Tap Connection, Protection works for different dia. UPVC/DI distribution pipeline by UC bullah/Bamboo pile at different places, Construction of 200 Cum capacity 20 mtr staging height R.C.C Over Head water Reservoir as per Departmental design, drawing and specification including bored pile & pile cap, Construction of switch room cum chlorine room with sanitary & water supply arrangement i/c plinth protection at PH No.-1 (Size-5.40x3.60 mtr.) & PH No-2 (Size-3.60x3.00 mtr.) for Jhikra w/s scheme, Minakhan Block under Hasnabad Sub-Division, PHE Dte. ORD/000138/2023-2024 1704/BD 08/06/2023 1086 M/S NIRMAN CONSTRUCTION. 403.64 320.05 80
206 Barasat Division Formal work order for Laying of DI rising main, DI/UPVC distribution pipe line, Providing Functional Household Tap Connection, Protection works for different dia. UPVC/DI distribution pipeline by UC bullah/Bamboo pile at different places, Construction of 250 Cum capacity 20 mtr staging height R.C.C Over Head water Reservoir as per Departmental design, drawing and specification including bored pile & pile cap, Construction of switch room cum chlorine room with sanitary & water supply arrangement i/c plinth protection at PH No.-1 (Size-5.40x3.60 mtr.) & PH No-2 (Size-3.60x3.00 mtr.) for Khariberia w/s scheme, Minakhan Block under Hasnabad Sub-Division, PHE Dte. ORD/000139/2023-2024 1705/BD 08/06/2023 1095 M/S PROGATI ENTERPRISE. 400.07 272.17 90
207 Barasat Division Acceptance cum work order for Balance work of Providing FHTC (Functional Household Tap Connection) by Augmentation For Akipur Water Supply Scheme in Basirhat-II Block of North 24 Parganas District within Basirhat Sub-Division under Barasat Division PHE Dte. ORD/000139/2025-2026 2000/BD 17/06/2025 240 M/S MITRA CONSTRUCTION. 56.17 0.00 0
208 Barasat Division Formal work order for Laying of DI rising main, DI/UPVC distribution pipe line, Providing Functional Household Tap Connection, Protection works for different dia. UPVC/DI distribution pipeline by UC bullah/Bamboo pile at different places, Construction of 150 cum capacity CWR, pipe connection and cost of pipes specials, Construction of switch room cum chlorine room with sanitary & water supply arrangement i/c plinth protection at P.H. No.-1 (Size - 5.40 x 3.60 mtr.) & P.H. No-2 (Size - 3.60 x 3.00 mtr.) for Hatbhanga W/S Scheme, Minakhan Block under Hasnabad Sub-Division, P.H.E. Dte. ORD/000140/2023-2024 1714/BD 08/06/2023 366 POWER TOOLS & ENGINEERING 268.27 113.97 65
209 Barasat Division Acceptance cum work order for Sinking of 1 no. 300 mm. x 200 mm. dia. 250 mtr deep Tubewell by D.R. Rig method having 300 mm. dia. 36 mtr. long housing pipe & 200 mm. dia. 30 mtr. long ribbed strainer at Head Work site for Augmentation of Diara (Zone-II) Water Supply Scheme within the jurisdiction of Bongaon Sub-Division under Barasat Division, P.H.E. Dte. ORD/000143/2025-2026 2042/BD 20/06/2025 60 JOY GURU ENTERPRISE 16.37 0.00 0
210 Barasat Division Formal work order for Laying of DI rising main, DI/UPVC distribution pipe line, Providing Functional Household Tap Connection, Protection works for different dia. UPVC/DI distribution pipeline by UC bullah/Bamboo pile at different places, Construction of 150 cum capacity CWR , pipe connection and cost of pipes, specials, Construction of switch room cum chlorine room with sanitary & water supply arrangement i/c plinth protection at PH No.-1 (Size-5.40x3.60 mtr.) & PH No-2 (Size-3.60x3.00 mtr.) for Ghipukuria w/s scheme, Minakhan Block under Hasnabad Sub-Division, PHE Dte. ORD/000144/2023-2024 1698/BD 08/06/2023 1096 TIRUPATI ENTERPRISES 270.61 111.74 70
211 Barasat Division Formal work order for Construction of 300 cum capacity 20 mtr. height R.C.C. Over Head Reservoir as per Deptt. design, drawing & specification including bored pile & pile cap, laying of DI rising main & distribution pipe line by DI/UPVC and Providing FHTC for Augmentaion of Shibalaya water supply scheme under Barasat Sub-Division, P.H.E. Dte. ORD/000148/2023-2024 1713/BD 08/06/2023 731 DIAMOND ENGINEER'S CO-OP. SOCIETY LTD. 364.71 185.68 80
212 Barasat Division Acceptance cum work order for Providing Functional tap connection at Sitalia Khaitala SSK, ICDS Centre no-77, Dakshin Sitalia FP School, South Hatgacha Jr. Basic School and Hatgacha Goramari FP Schoolwithin the command area of Khulna Bhanderkhali w/s scheme, Sandeshkhali-II block under Hasnabad Sub- Division P.H.E. Dte. ORD/000148/2025-2026 997/HSD 04/06/2025 10 RAJPATH ENGINEERS-CO-OPERATIVE SOCIETY LTD. 0.96 0.00 0
213 Barasat Division Formal work order for Laying of DI rising main, DI/UPVC distribution pipe line, Providing Functional Household Tap Connection, Protection works for different dia. UPVC/DI distribution pipeline by UC bullah/Bamboo pile at different places, Construction of 250 Cum capacity 20 mtr staging height R.C.C Over Head water Reservoir as per Departmental design, drawing and specification including bored pile & pile cap, Construction of switch room cum chlorine room with sanitary & water supply arrangement i/c plinth protection at P.H. No.-1 (Size-5.40 x 3.60 mtr.) & P.H. No.-2 (Size-3.60 x 3.00 mtr.) for Bamanpukuria w/s scheme, Minakhan Block under Hasnabad Sub-Division, P.H.E. Dte. ORD/000146/2023-2024 1706/BD 08/06/2023 1096 MONDAL & CO. (BASIRHAT). 462.55 332.94 86
214 Barasat Division Formal work order for Construction of 350 cum capacity 20 mtr. height R.C.C. Over Head Reservoir as per Deptt. design, drawing & specification including bored pile & pile cap, laying of DI rising main & distribution pipe line by DI/UPVC and Providing FHTC for Augmentaion of Nebadhui Duttapukur (Zone - I) water supply scheme under Barasat Sub-Division, P.H.E. Dte. ORD/000149/2023-2024 1712/BD 08/06/2023 731 DIAMOND ENGINEER'S CO-OP. SOCIETY LTD. 386.46 181.58 75
215 Barasat Division Acceptance cum work order for 1 no. pump connection at PH No.-1 in connection within Mallickgheri water supply scheme , Minakhan block under Hasnabad Sub-Division, P.H.E. Dte. ORD/000149/2025-2026 998/HSD 04/06/2025 10 M/S DATTA ENTERPRISE. 0.72 0.00 0
216 Barasat Division Formal work order for Laying of DI / UPVC distribution pipe line & Providing FHTC (Functional Household Tap Connection) by Augmentation for Parui (Zone - II) water Supply Scheme in Swarupnagar Block of North 24 Parganas District under Barasat Division, P.H.E. Dte. ORD/000150/2023-2024 1711/BD 08/06/2023 749 ALOK ENTERPRSE. (A UNIT OF SAKET TREXIM PVT.LTD) 583.80 367.49 25
217 Barasat Division Acceptance cum work order for Emergent repairing of existing FHTC in connection with retrofitting work at different places in Mouli mouza within Malancha w/s scheme (Z-II), Minakhan block under Hasnasbad Sub-Division, P.H.E.Dte. ORD/000151/2025-2026 999/HSD 04/06/2025 10 M/S R.B.S.ENTERPRISE. 0.96 0.00 0
218 Barasat Division Formal work order for Providing Functional Household Tap Connection (FHTC) in connection with Jal Jeevan Mission (JJM) and Jal Swapna Programme within command area of Sukhdaoni w/s scheme, Sandeshkhali-II block under Hasnabad Sub-Division, PHE Dte. ORD/000153/2022-2023 1660/BD 10/06/2022 90 SUPRITI ENTERPRISE. 113.40 102.01 1
219 Barasat Division Acceptance cum work order for 1 no. pump connection at PH No.-2 in connection with Augmentation for Chandpur (Z-I) water supply scheme, Hasnabad block under Hasnabad Sub-Division, P.H.E. Dte. ORD/000154/2025-2026 1001/HSD 04/06/2025 10 M/S GHOSH CONSTRUCTION. 0.81 0.00 0
220 Barasat Division Acceptance cum work order for Improvement of existing IEP & other related allied works and including adding 1 no. Polishing unit (3.15 m. dia. x 1.50 m. ht.) (including media) under Augmentation of Diara Water Supply Scheme, Bagdah Block within the jurisdiction of Bongaon Sub-Division under Barasat Division, P.H.E. Dte. ORD/000155/2025-2026 2074/BD 24/06/2025 45 ONKAR ENTERPRISE. 21.65 0.00 0
221 Barasat Division Formal work order for Construction of 300 cum capacity 20 mtr. height R.C.C. Over Head Reservoir as per Deptt. design, drawing & specification including bored pile & pile cap, laying of DI rising main & distribution pipe line by DI/UPVC and Providing FHTC for Augmentaion of Matiagachha water supply scheme under Barasat Sub-Division, P.H.E. Dte. ORD/000156/2023-2024 1715/BD 08/06/2023 366 MITRA CONSTRUCTION. 378.68 141.81 39
222 Barasat Division Acceptance cum work order for Improvement of existing IEP & other related allied works and including adding 1 no. Polishing unit and Repairing & renovation of Compressor Room for Iron Elimination Plant under Augmentation of Kamalabas Water Supply Scheme, Bagdah Block within the jurisdiction of Bongaon Sub-Division under Barasat Division, P.H.E. Dte. ORD/000156/2025-2026 2448/BD 15/07/2025 45 MONDAL ENTERPRISE. (BARASAT) 23.45 0.00 0
223 Barasat Division Formal work order for Construction of 200 cum capacity 20 mtr. height R.C.C. Over Head Reservoir as per Deptt. design, drawing & specification including bored pile & pile cap, laying of DI rising main & distribution pipe line by DI/UPVC and Providing FHTC for Augmentaion of Kashimpur water supply scheme under Barasat Sub-Division, P.H.E. Dte. ORD/000157/2023-2024 1716/BD 08/06/2023 366 S.S.ENTERPRISE. (BAMANGACHI) 318.43 317.44 90
224 Barasat Division Hiring of Diesel Luxury Car is essential for proper supervision of huge number of ground water based Augmentation Scheme at different blocks under Basirhat Sub-Division P.H.E. Dte. (Period 01.07.2024 to 31.12.2024 for Six Month), Sl.No. - 01 ORD/000157/2024-2025 1017/BHTSD 28/06/2024 184 OM ENTERPRISE 0.87 2.03 0
225 Barasat Division Formal work order for Laying of DI/UPVC distribution pipe line and providing Functional Household Tap Connection for Augmentation of Simla Durgapur (Zone-II)water supply scheme in Baduria Block under Barasat Division, P.H.E Dte. ORD/000158/2023-2024 1717/BD 08/06/2023 698 UTPAL CONSTRUCTION & CO. 446.82 258.18 48
226 Barasat Division Hiring Diesel Luxury Car on daily basis for the supervision of work and office uses under Basirhat Sub-Division P.H.E. Dte. (Period: 01.07.2024 to 31.12.2024), Sl.No. - 02 ORD/000159/2024-2025 1018/BHTSD 28/06/2024 184 DEB KUMAR DAS. 0.87 1.35 0
227 Barasat Division Acceptance cum work order for Special repair & renovation of boundary wall and other allied Works for Pump House No - 1 of Deora W/S scheme in connection with Augmentation work under JJM project within the jurisdiction of Habra Sub-Division under Barasat Division, P.H.E. Dte. ORD/000160/2024-2025 1798/BD 01/07/2024 30 M/S SUKANTA ENTERPRISE. 5.27 0.00 0
228 Barasat Division Acceptance cum work order for construction of the Boundary wall in Pump House No. 2 of Janaphul Piped Water Supply Scheme in connection with Augmentation work under JJM project within the jurisdiction of Habra Sub-Division under Barasat Division, PHE Dte. ORD/000162/2024-2025 1799/BD 01/07/2024 45 AREOCON. 5.19 0.00 0
229 Barasat Division Formal work order for Providing Functional Household Tap Connection (FHTC) in connection with Jal Jeevan Mission (JJM) and Jal Swapna Programme within command area of Chunchura w/s scheme, Sandeshkhali-I block under Hasnabad Sub-Division, PHE Dte. ORD/000163/2022-2023 1667/BD 13/06/2022 90 S. GHOSH & ASSOCIATES PVT. LTD. 266.33 243.28 1
230 Barasat Division Formal work order for Laying of DI/UPVC distribution pipe line and providing Functional Household Tap Connection for Augmentation of Bithari Z-II B water supply scheme in Swarupnagar Block under Barasat Division, P.H.E Dte. ORD/000163/2023-2024 1719/BD 08/06/2023 698 CHAKRABORTTI ENTERPRISE. 180.55 144.91 20
231 Barasat Division Formal work order for Providing Functional Household Tap Connection (FHTC) in connection with Jal Jeevan Mission (JJM) and Jal Swapna Programme within command area of Bhangatushkhali w/s scheme, Sandeshkhali-II block under Hasnabad Sub-Division, PHE Dte. ORD/000164/2022-2023 1668/BD 13/06/2022 90 S. GHOSH & ASSOCIATES PVT. LTD. 168.43 167.55 1
232 Barasat Division Formal work order for Laying of DI/UPVC distribution pipe line and providing Functional Household Tap Connection for Augmentation of Baro Bankra water supply scheme in Swarupnagar Block under Barasat Division, P.H.E Dte. ORD/000164/2023-2024 1720/BD 08/06/2023 642 MADE & TRADE CO. 433.09 343.70 58
233 Barasat Division Acceptance cum work order for construction of the Boundary wall in Pump House No 2 & Pump House No. 3 of Maslandapur- I Piped Water Supply Scheme in connection with Augmentation work under JJM project within the jurisdiction of Habra Sub-Division under Barasat Division, PHE Dte. ORD/000166/2024-2025 1801/BD 01/07/2024 45 ANJALI CONSTRUCTION. 6.11 0.00 0
234 Barasat Division Acceptance cum work order for construction of the Service Road (88.00 Mtr. Length & 3.00 Mtr. Wide while 1.00 Mtr. wide road already existing) in Head Work Site of Maslandapur- I Piped Water Supply Scheme in connection with Augmentation work under JJM project within the jurisdiction of Habra Sub-Division under Barasat Division, PHE Dte. ORD/000167/2024-2025 2209/BD 06/08/2024 15 PUSPA CONSTRUCTION. 5.60 0.00 0
235 Barasat Division Acceptance cum work order for Construction of 300 cum capacity 20 mtr. staging height R.C.C. Over Head Water Reservoir as per Departmental design, drawing and specification including bored pile & pile cap at Rajbari water supply scheme, Sandeshkhali-I block under Hasnabad Sub-Division, PHE Dte. ORD/000168/2022-2023 1152/BD 12/04/2022 240 S.S.ENTERPRISE. (BAMANGACHI) 97.05 30.31 1
236 Barasat Division Acceptance cum work order for Withdrawing, relaying of different dia. UPVC pipe line at Chaktangramari para in connection with augmentation of Hasnabad water supply scheme under Hasnabad Sub-Division, P.H.E.Dte. ORD/000168/2025-2026 1005/HSD 04/06/2025 10 SARKAR ENTERPRISE 0.95 0.00 0
237 Barasat Division Acceptance cum work order for Construction of 350 cum capacity 20 mtr. staging height R.C.C. Over Head Water Reservoir as per Departmental design, drawing and specification including bored pile & pile cap at Chotto Sehara water supply scheme, Sandeshkhali-I block under Hasnabad Sub-Division, PHE Dte. ORD/000169/2022-2023 1153/BD 12/04/2022 240 M/S S.S.ENTERPRISE. (SOUTH) 146.26 49.03 1
238 Barasat Division Acceptance cum work order for Arrangement Of Block Level Orientation programe involving stakeholders of PRI bodies including refreshments, training materials and related activities for 2 nos Blocks ( Hasnabad & Hingalganj) in North 24 Parganas under Barasat Division, P.H.E Dte. ORD/000171/2024-2025 754/HSD 19/07/2024 10 IMAGIN 0.98 0.98 100
239 Barasat Division Continuation work order for Hiring 1(One) No. Diesel Luxury Car on Daily basis for the office use of the Assistant Engineer, Barasat Sub Division, P.H.E. Dte. (For the Period from 01/06/2025 to 30/11/2025) ORD/000171/2025-2026 175/BSD 27/05/2025 183 MADHAB CHANDRA DAS 0.87 0.00 0
240 Barasat Division Formal work order for Laying of DI/UPVC distribution pipe line and providing Functional Household Tap Connection for Augmentation of Gokna Zone-I A water supply scheme in Baduria Block under Barasat Division, P.H.E Dte. ORD/000172/2023-2024 1726/BD 08/06/2023 90 SUJIT KUMAR SAHA 224.48 144.93 10
241 Barasat Division Acceptance cum work order for Arrangement Of Block Level Orientation programe involving stakeholders of PRI bodies including refreshments, training materials and related activities for 2 nos Blocks ( Sandeshkhali- I & II ) in North 24 Parganas under Barasat Division, P.H.E Dte. ORD/000172/2024-2025 755/HSD 19/07/2024 10 IMAGIN 0.98 0.98 100
242 Barasat Division Formal work order for Providing Functional Household Tap Connection (FHTC) in connection with Jal Jeevan Mission (JJM) and Jal Swapna Programme within command area of Joygopalpur w/s scheme, Sandeshkhali-II block under Hasnabad Sub-Division, PHE Dte. ORD/000173/2022-2023 1746/BD 20/06/2022 90 ALOK ENTERPRSE. (A UNIT OF SAKET TREXIM PVT.LTD) 278.19 213.07 1
243 Barasat Division Acceptance cum work order for Arrangement Of Block Level Orientation programe involving stakeholders of PRI bodies including refreshments, training materials and related activities for 1 no Block (Minakhan) in North 24 Parganas under Barasat Division, P.H.E Dte. ORD/000173/2024-2025 756/HSD 19/07/2024 10 IMAGIN 0.49 0.00 100
244 Barasat Division Acceptance cum work order for Sinking of 2 nos. 300 mm. x 200 mm. dia. 360 mtr deep as replacement Tubewell by D.R. Rig method at PH No.- 1 & 2 with PVC pipe & strainer having 250mm dia 36 mtr. long housing pipe & 150mm dia 30 mtr. long filter at Rajbari w/s scheme, Sandeshkhali-I block under Hasnabad Sub-Division, P.H.E. Dte. ORD/000174/2022-2023 1893/BD 05/07/2022 30 BABUSONA CONSTRUCTION. 43.55 37.54 0
245 Barasat Division Acceptance cum work order for Sinking of 1 no. 300 mm. x 200 mm. dia. 360 mtr deep Tubewell by D.R. Rig method at PH No.- 1 (Defunct tube well site) with PVC pipe & strainer having 300mm dia 36 mtr. long housing pipe & 200mm dia 30 mtr. long filter for Augmentation of Rupmari w/s scheme (Zone-V), Hingalganj block under Hasnabad Sub-Division, P.H.E. Dte. ORD/000175/2022-2023 1750/BD 20/06/2022 30 M/S K.P.PAL. 21.33 13.02 1
246 Barasat Division Acceptance cum work order for Construction of Pressure sand filter of capacity 120 cum/hr at Hingalganj w/s scheme (Zone-I), Hingalganj Block under Hasnabad Sub-Division, PHE Dte. ORD/000190/2025-2026 2023/BD 18/06/2025 150 FIDERE MARINE SERVICES PVT. LTD. 38.29 0.00 0
247 Barasat Division Formal work order for Construction of switch room cum chlorine room with sanitary & water supply arrangement i/c plinth protection at PH No.-1 (Size-5.40x3.60 mtr.) & PH No-2, 3 & 4 (Size-3.60x3.00 mtr.), Laying of DI rising main and DI/UPVC distribution pipe line, providing Functional Household Tap Connection, Protection works for different dia. UPVC/DI distribution pipeline by UC bullah/Bamboo pile at different places, Construction of 200 cum capacity 20 mtr.staging height R.C.C Over Head water Reservoir as per Departmental design, drawing and specification including bored pile & pile cap for Katakhali water supply scheme, Hasnabad Block under Hasnabad Sub-Division, P.H.E. Dte ORD/000191/2023-2024 1729/BD 08/06/2023 1028 SRI KRISHNA CO-OP-LABOUR CONTRACT AND CONST SOC LTD. 389.24 273.03 100
248 Barasat Division Acceptance cum work order for Construction of 100 cum/hr Iron Removal Plant with blower room & other allied works within Laukhali w/s scheme, Sandeshkhali-I block under Hasnabad Sub-Division P.H.E. Dte. ORD/000192/2025-2026 2024/BD 18/06/2025 150 FIDERE MARINE SERVICES PVT. LTD. 38.30 0.00 0
249 Barasat Division Continuation work order for the work of Hiring Diesel Luxury Car on daily basis for the Office of the Dy. Superintending Engineer-I, Monitoring Cell, PHE Dte. (Period from 01-07-2022 to 31-12-2022). ORD/000193/2022-2023 1819/BD 27/06/2022 184 DIPANKAR NASKAR. 0.87 1.77 1
250 Barasat Division construction of Service Road (55 Mtr. Length and 2 Mtr. Width) for Pump House No:1 of Deora Water Supply Scheme in connection with Augmentation work under JJM project within the jurisdiction of Habra Sub-Division under Barasat Division, PHE Dte. ORD/000196/2024-2025 689/HAB 24/07/2024 15 M/S SUKANTA ENTERPRISE. 3.52 0.00 0
251 Barasat Division Acceptance cum work order for Construction of switch room cum chlorine room with sanitary and water supply arrangement including plinth protection at PH No.-1 (Size-5.40x3.60 mtr.) & PH No.-2 (Size-3.60x3.00 mtr.) within Nityabaria w/s scheme, Sandeshkhali-I block under Hasnabad Sub-Division, P.H.E. Dte. ORD/000209/2022-2023 1889/BD 05/07/2022 60 BABUSONA CONSTRUCTION. 12.50 12.63 10
252 Barasat Division Formal work order for Construction of 250 Cum capacity 20 mtr staging height R.C.C Over Head water Reservoir as per Departmental design, drawing and specification including bored pile & pile cap for Augmentation of Kalitala (Zone-I) water supply scheme, Hingalganj Block under Hasnabad Sub-Division, PHE Dte. ORD/000216/2023-2024 1731/BD 08/06/2023 1096 M/S PROGATI ENTERPRISE. 141.21 0.00 0
253 Barasat Division Formal work order for Construction of 300 Cum capacity 20 mtr staging height R.C.C Over Head water Reservoir as per Departmental design, drawing and specification including bored pile & pile cap for Augmentation of Kalitala (Zone-II) water supply scheme, Hingalganj Block under Hasnabad Sub-Division, PHE Dte. ORD/000218/2023-2024 1733/BD 08/06/2023 730 M/S NIRMAN CONSTRUCTION. 150.78 54.42 75
254 Barasat Division Continuation work order for the work of Hiring Diesel Luxury Car on daily basis (for 6months from 01-07-2022 to 30-09-2022) for the Office of the Assistant Engineer (HQ), Barasat Division, PHE Dte. ORD/000221/2022-2023 1863/BD 30/06/2022 92 M/S SAMIT CHANDRA DEY. 0.44 0.71 1
255 Barasat Division Acceptance cum work order for Supply of Mechanized boat on hire basis with providing driver, helper and other requirement as per terms condition and specification as per direction of the EIC under Hasnabad Sub-Division, P.H.E. Dte. Period : 01.08.2022 to 31.07.2023 = 365 days. ORD/000224/2022-2023 1118/HSD 08/07/2022 1 RANJIT KUMAR MANDAL. 3.23 11.93 100
256 Barasat Division Formal work order for Providing FHTC including laying of Pipe Line, Renovation of Filter Media, Repairing of Wooden Jetty and Electro Mechanical Work for Augmentation at Tyantra Neora pond based water supply scheme in Basirhat - II Block of North 24 Parganas District under Barasat Division, P.H.E. Dte. ORD/000233/2023-2024 1738/BD 08/06/2023 90 EFFLUENT & WATERTREATMENT ENGINEERS (P) LTD. 88.36 49.80 30
257 Barasat Division Acceptance cum work order for Protection works for rising main of 150mm dia. DI pipe line at pond of Muyajjem Husien Molla within Sultanpur w/s scheme, Minakhan block under Hasnabad Sub-Division P.H.E. Dte. ORD/000234/2022-2023 1143/HSD 12/07/2022 10 MONDAL & CO. (BASIRHAT). 4.69 4.65 1
258 Barasat Division Formal work order for Laying of DI/UPVC distribution pipe line and Providing FHTC (Functional Household Tap Connection) for Augmentation of Taranipur Zone-I Water Supply Scheme in Swarupnagar Block of North 24 Parganas District under Barasat Division, P.H.E. Dte. ORD/000235/2023-2024 1734/BD 08/06/2023 630 DIVINE 307.75 266.66 75
259 Barasat Division Acceptance cum work order for Protection works for newly laid different dia. UPVC/DI pipe line at different places in Mamudpur mouza within Hingalganj W/S/Scheme(Z-I). Hingalganj Block under Hasnabad Sub -Division P.H.E. Dte. ORD/000237/2021-2022 1461/BD 13/08/2021 15 M/S K.B.ENTERPRISE. 16.06 14.00 1
260 Barasat Division Acceptance cum work order for Construction of anchor block for resting of 100/150 mm dia DI pipeline at different places within Laukhali Patharghata w/s scheme, Sandeshkhali-I block under Hasnabad Sub-Division P.H.E. Dte. ORD/000238/2022-2023 1147/HSD 12/07/2022 15 PRITAM MUKHOPADHYAY. 4.06 3.97 0
261 Barasat Division Formal work order for construction of 300 cum capacity 20 mtr. staging height R.C.C. Over Head Reservoir as per Deptt. design, drawing and specification including bored pile with pile cap for Augmentaion of Padmapukuria water supply scheme (Zone - II), Minakhan Block under Hasnabad Sub-Division, P.H.E. Dte. ORD/000241/2023-2024 1739/BD 08/06/2023 724 M/S B.K.ENTERPRISE. 121.96 0.00 100
262 Barasat Division Formal work order for Providing Functional House Hold Tap Connection (FHTC) from existing and new proposed distribution system within command area at Gangrapota(Additional) Water Supply Scheme under Bongaon Sub-Division, PHE Dte. ORD/000242/2023-2024 2030/BD 13/07/2023 90 RAJ KUMAR MONDAL 175.40 174.09 70
263 Barasat Division Acceptance cum work order for Connection of OHR from rising main and other allied works at Head Work site within Bermajur w/s scheme, Sandeshkhali-II Block under Hasnabad Sub- Division P.H.E. Dte. ORD/000243/2022-2023 1152/HSD 12/07/2022 15 M/S NIRMAN CONSTRUCTION. 4.11 4.10 1
264 Barasat Division Acceptance cum work order for Additional works for approach road with cement concrete and other allied works at Head Work site within Bermajur w/s scheme, Sandeshkhali-II block under Hasnabad Sub- Division P.H.E. Dte. ORD/000244/2022-2023 1153/HSD 12/07/2022 15 M/S NIRMAN CONSTRUCTION. 1.55 1.55 1
265 Barasat Division Formal work order for Construction of 350 cum. capacity 20 mtr. staging height R.C.C. Over Head Water Reservoir as per Departmental design, drawing and specification including bored pile, pile cap & Soil Investigation and laying of Rising Main, Distribution Main with Providing Functional House Hold Tap Connection (FHTC) from existing and new proposed distribution system within command area at Purana Bongaon Water Supply Scheme under Bongaon Sub-Division, PHE Dte. (New Scheme). ORD/000246/2023-2024 2033/BD 13/07/2023 366 M/S B.K.ENTERPRISE. 431.33 218.89 55
266 Barasat Division Arrangement of Block Level Orientation Programe involving stakeholders of PRI bodies including refreshments, training materials and related activities for 2 nos Blocks (Barasat-I & II) in North 24 Parganas under Barasat Division, P.H.E. Dte. ORD/000246/2024-2025 171/BSD 10/06/2024 7 IMAGIN 0.98 0.98 100
267 Barasat Division Acceptance cum work order for Protection works for protection of DI rising main at near PH No- 3 (Old LS) within Hingalganj w/s scheme, Hingalganj block under Hasnabad Sub-Division P.H.E. Dte. ORD/000247/2022-2023 1156/HSD 12/07/2022 10 RAJPATH ENGINEERS-CO-OPERATIVE SOCIETY LTD. 2.53 2.53 1
268 Barasat Division Arrangement of Block Level Orientation Programe involving stakeholders of PRI bodies including refreshments, training materials and related activities for 2 nos Blocks (Amdanga & Deganga) in North 24 Parganas under Barasat Division, P.H.E. Dte. ORD/000247/2024-2025 172/BSD 10/06/2024 7 IMAGIN 0.98 0.98 100
269 Barasat Division Formal Work order for Construction of 100 cum. capacity 20 mtr. staging height R.C.C. Over Head Water Reservoir as per Departmental design, drawing and specification including bored pile, pile cap & Soil Investigation and laying of Rising Main, Distribution Main with Providing Functional House Hold Tap Connection (FHTC) from existing and new proposed distribution system within command area at Garibpur Water Supply Scheme under Bongaon Sub-Division, PHE Dte. (New Scheme) ORD/000248/2023-2024 2057/BD 14/07/2023 731 AMIT KUMAR BOSE. 223.93 116.43 54
270 Barasat Division Acceptance cum work order for Construction of anchor block for resting of 150 mm dia DI distribution main pipeline over existing concrete wall beside Basanti Highway at near Bitpole in connection with Augmentation of Fakirtakia w/s scheme, Sandeshkhali-I block under Hasnabad Sub-Division P.H.E. Dte. ORD/000249/2023-2024 775/HSD 13/07/2023 10 NEW LIFE CONSTRUCTION. 0.94 0.94 100
271 Barasat Division Relaying of 90mm, 110mm dia UPVC pipe line and repairing of FHTC connection which damaged due to construction of drain from local Panchayet at Node no. 103 to 137 of Zafarpur pwss under Basirhat Sub-Division, under Barasat Division, PHE Dte. ORD/000249/2024-2025 1022/BHTSD 28/06/2024 7 RAKESH ENTERPRISE. 0.89 0.27 100
272 Barasat Division Acceptance cum work order for Repairing & construction of boundary wall for movement of rig machineries for sinking of big dia TW at PH no- 3 in connection with Augmentation of Bouthakurani w/s scheme (Z-I), Sandeshkhali-II block under Hasnabad Sub-Division P.H.E. Dte. ORD/000250/2023-2024 776/HSD 13/07/2023 10 PRITAM MUKHOPADHYAY. 0.73 0.73 100
273 Barasat Division Relaying of 90mm, 110mm, 125mm, 160mm dia UPVC pipe line which damaged due to strengthening and culvert construction in Gopalpur Haroa road by PWD (Roads) Department at Node no. 429/465 & 543 to 563 of Zafarpur pwss under Basirhat Sub-Division, under Barasat Division, PHE Dte. ORD/000250/2024-2025 1023/BHTSD 28/06/2024 7 RAKESH ENTERPRISE. 0.99 0.99 100
274 Barasat Division Relaying of 75mm, 90mm, 110mm, 160mm dia UPVC pipe line which damaged due to strengthening and culvert construction in Gopalpur Haroa road by PWD (Roads) Department at Node no. 402 to 190 to 57 of Zafarpur pwss under Basirhat Sub-Division, under Barasat Division, PHE Dte. ORD/000251/2024-2025 1024/BHTSD 28/06/2024 7 RAKESH ENTERPRISE. 0.99 0.00 100
275 Barasat Division Relaying of 160mm dia UPVC pipe line and repairing of FHTC connection which damaged due to strengthening and culvert construction in Gopalpur Haroa road by PWD (Roads) Department at Node no. 190 to 57 of Zafarpur pwss under Basirhat Sub-Division, under Barasat Division, PHE Dte. ORD/000252/2024-2025 1025/BHTSD 28/06/2024 7 RAKESH ENTERPRISE. 0.96 0.00 100
276 Barasat Division Acceptance cum work order for Emergent restoration of approach road for movement of rig machineries for sinking of big dia TW at PH no- 1 in connection with Augmentation of Bouthakurani w/s scheme (Z-II), Sandeshkhali-II block under Hasnabad Sub-Division P.H.E. Dte ORD/000253/2023-2024 779/HSD 13/07/2023 10 NURJAHAN ENTERPRISE. 0.79 0.79 100
277 Barasat Division Acceptance cum work order for Additional Emergent restoration of approach road for movement of rig machineries for sinking of big dia TW at PH no- 1 in connection with Augmentation of Bouthakurani w/s scheme (Z-II), Sandeshkhali-II block under Hasnabad Sub-Division P.H.E. Dte. ORD/000254/2023-2024 780/HSD 13/07/2023 10 SHYAM SUNDAR DAS. 0.55 0.00 0
278 Barasat Division Acceptance cum work order for Repairing & construction of boundary wall for movement of rig machineries for sinking of big dia TW at PH no- 1 in connection with Augmentation of Bouthakurani w/s scheme (Z-II), Sandeshkhali-II block under Hasnabad Sub-Division P.H.E. Dte ORD/000255/2023-2024 781/HSD 13/07/2023 10 PRITAM MUKHOPADHYAY. 0.60 0.60 100
279 Barasat Division Acceptance cum work order for Land development at OHR site in connection with augmentation of Durgapur Baylani w/s scheme (Z-I), Hingalganj under Hasnabad Sub-Division P.H.E. Dte. ORD/000255/2025-2026 2334/BD 07/07/2025 60 BABUSONA CONSTRUCTION. 7.13 0.00 0
280 Barasat Division Acceptance cum work order for Repairing & construction of boundary wall for movement of rig machineries for sinking of big dia TW at PH no- 2 in connection with Augmentation of Bouthakurani w/s scheme (Z-II), Sandeshkhali-II block under Hasnabad Sub-Division P.H.E. Dte. ORD/000256/2023-2024 782/HSD 13/07/2023 10 NURJAHAN ENTERPRISE. 0.93 0.92 100
281 Barasat Division Work Order for " Providing Functional Household Tap Connection (FHTC) in Sandlerbil Mouza including laying of UPVC/PVC pipe & supply of necessary fittings within Hingalganj W/S/Scheme (Zone-II), Hingalganj Block under Hasnabad Sub-Division, P.H.E.Dte." ORD/000257/2020-2021 49/BD 13/01/2021 90 J.D.J.ENTERPRISE. (TRADERS PVT.LTD) 155.31 29.14 1
282 Barasat Division Acceptance cum work order for Construction of anchor block for resting of 150 mm dia DI distribution main pipeline over existing concrete wall beside Basanti Highway at near Chotto Ajgora in connection with Augmentation of Fakirtakia w/s scheme, Sandeshkhali-I block under Hasnabad Sub-Division P.H.E. Dte. ORD/000257/2023-2024 783/HSD 13/07/2023 10 NEW LIFE CONSTRUCTION. 0.94 0.94 29
283 Barasat Division Acceptance cum work order for Repairing & construction of boundary wall for movement of rig machineries for sinking of big dia TW at PH no- 4 in connection with Augmentation of Bouthakurani w/s scheme (Z-I), Sandeshkhali-II block under Hasnabad Sub-Division P.H.E. Dte. ORD/000258/2023-2024 784/HSD 13/07/2023 10 SHYAM SUNDAR DAS. 0.71 0.70 100
284 Barasat Division Acceptance cum work order for Dismantling & Re-construction of boundary wall for movement of rig & other machineries for sinking of big dia TW at PH no- 2 in connection with Augmentation of Boyermari Abad w/s scheme, Sandeshkhali-I block under Hasnabad Sub-Division P.H.E. Dte ORD/000259/2023-2024 785/HSD 13/07/2023 10 MD.SALIM GAZI. 0.87 0.87 100
285 Barasat Division Special repairing of rising mains pipe lines at Mathurapur water supply scheme under Basirhat Sub-Division under Barasat Division PHE Dte. ORD/000259/2024-2025 1030/BHTSD 28/06/2024 7 ANKUSH CONSTRUCTION & CO. 0.90 0.00 0
286 Barasat Division Acceptance cum work order for Protection of newly laid UPVC pipe line by bamboo pilling at different places of Laukhali Mouza within Laukhali w/s scheme, Sandeshkhali-I block under Hasnabad Sub- Division P.H.E. Dte. ORD/000260/2022-2023 1169/HSD 12/07/2022 15 M/S S.S.ENTERPRISE. (SOUTH) 4.81 4.80 1
287 Barasat Division Acceptance cum work order for Dismantling & Re-construction of boundary wall for movement of rig & other machineries for sinking of big dia TW at PH no-5 in connection with Augmentation of Rupmari w/s scheme (Z-II), Hingalganj block under Hasnabad Sub-Division P.H.E. Dte. ORD/000260/2023-2024 786/HSD 13/07/2023 10 SARKAR ENTERPRISE 0.88 0.88 100
288 Barasat Division Acceptance cum work order for Construction of anchor block for resting of 250/200 mm dia DI distribution main pipeline over existing concrete wall beside Basanti Highway at different places for Mathbari Abad w/s scheme, Sandeshkhali-I block under Hasnabad Sub-Division P.H.E. Dte. ORD/000262/2025-2026 2348/BD 08/07/2025 60 M/S DATTA ENTERPRISE. 6.10 0.00 0
289 Barasat Division Acceptance cum work order for Construction of anchor block for resting of 100 mm dia DI distribution main pipeline over existing concrete wall beside Basanti Highway at near PH No- 1 in connection with Augmentation of Fakirtakia w/s scheme, Sandeshkhali-I block under Hasnabad Sub-Division P.H.E. Dte. ORD/000263/2023-2024 789/HSD 13/07/2023 10 NEW LIFE CONSTRUCTION. 0.98 0.98 31
290 Barasat Division Acceptance cum work order for Laying of 200 mm dia. DI distribution main from PH No- 1 to PH No-2 & PH No- 2 to N/H/O Sudip Gayen for damage portion within Korakati w/s scheme, Sandeshkhali-II Block under Hasnabad Sub- Division P.H.E. Dte. ORD/000264/2022-2023 1186/HSD 13/07/2022 15 R.K.MANDAL & CO. 4.25 4.25 1
291 Barasat Division Acceptance cum work order for special repair renovation of existing structures like Pump house, Boundary Wall, High Lift Pump House, AIRP Pump House, Godown, Pathway etc. and allied pipe line work at Akhipur, Baro Bankra, Bithari Z-I, Bithari Z-II water supply scheme of different block under Basirhat Sub-Division, PHE Dte. ORD/000265/2025-2026 2381/BD 10/07/2025 150 JP CONSTRUCTION & SUPPLIERS. 81.91 0.00 0
292 Barasat Division Acceptance cum work order for Laying of 150 mm dia. DI distribution main from near PH No-1 to N/H/O Prasanta Mondal, N/H/O Sudip Gayen to Chanchal Chatterjee & Sudip Gayen to Santanu Joardar for damage portion within Korakati w/s scheme, Sandeshkhali-II Block under Hasnabad Sub- Division P.H.E. Dte. ORD/000267/2022-2023 1189/HSD 13/07/2022 15 R.K.MANDAL & CO. 4.27 4.27 1
293 Barasat Division Acceptance cum work order for Emergent fencing work for protecting the adjacent land of PH no-1 within Kanaikati Kathalberia w/s scheme (Z-I), Hingalganj block under Hasnabad Sub- Division P.H.E. Dte. ORD/000267/2023-2024 793/HSD 13/07/2023 10 NEW LIFE CONSTRUCTION. 0.91 0.00 0
294 Barasat Division Acceptance cum work order for 1 no. pump connection at PH No.-2 in connection within Bachra water supply scheme , Minakhan block under Hasnabad Sub-Division, P.H.E. Dte. ORD/000267/2025-2026 1477/HSD 14/07/2025 10 M/S SOURAV DAS 0.72 0.00 0
295 Barasat Division Acceptance cum work order for Laying of 100mm dia. DI distribution main from N/H/O Chanchal Chatterjee to N/H/O Kritanta Mondal & Biswajit Baidya for damage portion within Korakati w/s scheme, Sandeshkhali-II Block under Hasnabad Sub- Division P.H.E. Dte. ORD/000269/2022-2023 1191/HSD 13/07/2022 10 R.K.MANDAL & CO. 2.17 2.17 1
296 Barasat Division Acceptance cum work order for Construction of approach road with cement concrete and other allied works at PH No.- 3 within Hingalganj w/s scheme (Old), Hingalganj block under Hasnabad Sub- Division P.H.E. Dte. ORD/000270/2022-2023 1192/HSD 13/07/2022 15 PRASANTA MITRA. 3.44 3.08 91
297 Barasat Division Acceptance cum work order for Dismantling & Re-construction of boundary wall for movement of rig & other machineries for sinking of big dia TW at PH no-1 in connection with Augmentation of Khulna Bhandarkhali w/s scheme (Z-I), Sandeshkhali -II block under Hasnabad Sub-Division P.H.E. Dte. ORD/000272/2023-2024 799/HSD 13/07/2023 10 JESMINE ENTERPRISE. 0.90 0.88 100
298 Barasat Division Acceptance cum work order for Construction of approach road with cement concrete at Pump house No-1 within Khulna Bhanderkhali w/s scheme (Z-I), Sandeshkhali-II block under Hasnabad Sub-Division P.H.E. Dte ORD/000274/2023-2024 801/HSD 13/07/2023 7 JESMINE ENTERPRISE. 0.57 0.51 100
299 Barasat Division Acceptance cum work order for Laying of 150 mm dia. DI rising main from Uttar Kalibari Adhikary House to PH No- 2 within Mohanpur w/s scheme (Z-II), Minakhan Block under Hasnabad Sub- Division P.H.E. Dte. ORD/000279/2023-2024 806/HSD 13/07/2023 7 SARKAR ENTERPRISE 0.90 0.90 100
300 Barasat Division Acceptance cum work order for Sinking of 1 no. 300mm. X 200mm.dia. 190.00mtr. deep tubewell by direct rotary rig method, having 300mm.dia. 42.0mtr. long PVC housing pipe & 200mm.dia. 30.0mtr. long filter for Augumentation of Berachampa Zone-IV Water Supply Scheme at OHR Site under Barasat Sub-Division, P.H.E. Dte. ORD/000280/2024-2025 2193/BD 05/08/2024 30 ANJALI ENTERPRISE. 13.30 3.48 100
301 Barasat Division Acceptance cum work order for Construction of approach road, North side boundary wall & other allied works at PH no-1 within Hasnabad w/s scheme, Hasnabad block under Hasnabad Sub-Division P.H.E. Dte. ORD/000281/2023-2024 820/HSD 14/07/2023 21 ABDUL ALIM MONDAL. 2.73 2.69 100
302 Barasat Division Acceptance cum work order for Sinking of 1 no. 300mm. X 200mm.dia. 190.00mtr. deep tube well by direct rotary rig method, having 300mm.dia. 42.0mtr. long PVC housing pipe & 200mm.dia. 30.0mtr. long filter for Augmentation of Berachampa Zone-I Water Supply Scheme at 2nd Tube well Site under Barasat Sub-Division, P.H.E. Dte. ORD/000281/2024-2025 2192/BD 05/08/2024 30 M/S K.P.PAL. 13.30 12.65 100
303 Barasat Division Acceptance cum work order for Construction of boundary wall at North side for damaged portion, construction of approach road & other allied works at PH No-2 within Hasnabad w/s scheme, Hasnabad block under Hasnabad Sub-Division P.H.E. Dte. ORD/000282/2023-2024 821/HSD 14/07/2023 10 SARKAR ENTERPRISE 3.87 3.87 100
304 Barasat Division Acceptance cum work order for Construction of boundary wall at Pump House No-1, 2 & 5 for damaged portion and repairing of existing boundary wall within Rupmari w/s scheme, Hingalganj block under Hasnabad Sub-Division P.H.E. Dte. ORD/000283/2023-2024 822/HSD 14/07/2023 15 SRI KRISHNA CO-OP-LABOUR CONTRACT AND CONST SOC LTD. 4.38 0.00 0
305 Barasat Division Acceptance cum work order for Dismantling & Re-construction of boundary wall for movement of rig & other machineries for sinking of big dia TW at PH no- 2 in connection with Augmentation of Kumarjole w/s scheme, Minakhan block under Hasnabad Sub-Division P.H.E. Dte. ORD/000283/2025-2026 1493/HSD 14/07/2025 10 ABDUL ALIM MONDAL. 0.84 0.00 0
306 Barasat Division Acceptance cum work order for Construction of boundary wall at Pump House No-1, 2 & 5 for damaged portion and repairing of existing boundary wall within Rupmari w/s scheme, Hingalganj block under Hasnabad Sub-Division P.H.E. Dte. ORD/000284/2023-2024 822/HSD 14/07/2023 15 ANKUSH CONSTRUCTION & CO. 4.38 4.37 100
307 Barasat Division Acceptance cum work order for Repairing of Pump House No.-1 with allied works for Kanaikati Kathalberia w/s scheme (Zone-II), Hingalganj block under Hasnabad Sub-Division P.H.E. Dte. ORD/000286/2023-2024 824/HSD 14/07/2023 15 STAR CONSTRUCTION. 4.69 4.57 100
308 Barasat Division Acceptance cum work order for special repair and renovation of existing structures like Pump House, boundary Wall, High Lift Pump House, AIRP Pump House, Godown, Pathway etc. and allied pipe line work at Champapukur, Chandipur, Dakhin Debipur, Dhopaberia, Srinagar and Sangrampur Water Supply Scheme of different block under Basirhat Sub-Division, PHE Dte. ORD/000286/2025-2026 2424/BD 14/07/2025 150 DAS ENTERPRISE 82.86 0.00 0
309 Barasat Division Preparation of DPR in connection of augumentation of Bodai Water Supply Scheme Zone-I under Barasat Sub Division, P.H.E. Dte. Sl. No.-01 ORD/000287/2022-2023 548/BSD 29/06/2022 30 RADIANT 3.70 3.32 100
310 Barasat Division Acceptance cum work order for Construction of approach road with cement concrete at PH No- 1 & 2 for Kanaikati Kathalberia w/s scheme (Zone-II), Hingalganj block under Hasnabad Sub-Division P.H.E. Dte. ORD/000287/2023-2024 825/HSD 14/07/2023 10 STAR CONSTRUCTION. 3.92 3.84 100
311 Barasat Division Acceptance cum work order for special repair and renovation of existing structure like Pump House, Boundary Wall, High Lift Pump House, AIRP Pump House, Godown, Pathway etc. and allied pipe line work at Dobila, Eojnogar, Gobindapur Dhokra, Goknasree Gobindapur, Gotra, Sankchura and Mominpur Water Supply Scheme of different block within Basirhat Sub-Division under Barasat Division P.H.E. Dte. ORD/000287/2025-2026 2464/BD 16/07/2025 150 M/S TARAFDAR CONSTRUCTION 81.09 0.00 0
312 Barasat Division Preparation of DPR in connection of augumentation of Bodai Water Supply Scheme Zone-II under Barasat Sub Division, P.H.E. Dte. Sl. No.-02 ORD/000288/2022-2023 549/BSD 29/06/2022 30 RADIANT 3.41 3.39 100
313 Barasat Division Acceptance cum work order for Repairing of Pump House No-2 & other allied works for Kanaikati Kathalberia w/s scheme (Zone-II), Hingalganj block under Hasnabad Sub-Division P.H.E. Dte. ORD/000288/2023-2024 826/HSD 14/07/2023 10 PRASANTA MITRA. 4.20 3.74 100
314 Barasat Division Acceptance cum work order for Repairing of Pump House at PH No- 2 for Rajbari w/s scheme, Sandeshkhali-I block under Hasnabad Sub-Division P.H.E. Dte. ORD/000292/2023-2024 796/HSD 13/07/2023 7 SAGAR DAS. 0.62 0.56 100
315 Barasat Division Acceptance cum work order for Construction of anchor block for resting of 100 mm dia DI distribution main pipeline over existing concrete wall beside Basanti Highway at near Baro Ajgora in connection with Augmentation of Fakirtakia w/s scheme, Sandeshkhali-I block under Hasnabad Sub-Division P.H.E. Dte. ORD/000294/2023-2024 778/HSD 13/07/2023 10 NEW LIFE CONSTRUCTION. 0.89 0.89 29
316 Barasat Division Acceptance cum work order for Restoration of roads and emergency protection work under different places of Rajendrapur Water Supply Scheme within Basirhat Sub-Division under Barasat Division P.H.E.Dte. ORD/000294/2025-2026 2452/BD 16/07/2025 30 ABDUL CHHAMAD MANDAL 9.09 0.00 0
317 Barasat Division Acceptance cum work order for Repairing of pump house & boundary wall at PH No.-2 within Kalinagar w/s scheme (Old), Sandeshkhali-I Block under Hasnabad Sub-Division, P.H.E. Dte. ORD/000295/2023-2024 2106/BD 19/07/2023 21 M/S GHOSH CONSTRUCTION. 7.10 7.10 58
318 Barasat Division Acceptance cum work order for Laying of 50 mm dia. UPVC pipe line for providing 3 nos. tap connection at near Sulkuni Abad area within Bhabanipur W/S Scheme, Hasnabad block under Hasnasbad Sub-Division, P.H.E.Dte. ORD/000296/2023-2024 792/HSD 13/07/2023 7 M/S K.B.ENTERPRISE. 0.86 0.00 0
319 Barasat Division Acceptance cum work order for Special repair and renovation of existing structures like Pump House, Boundary Wall, High Lift Pump House, AIRP Pump House, Godown, Pathway etc. and allied pipe line work at Itinda Panitor, Joypur Gopmahal, Kachua Swarupnagar, Mathurapur, Mirzanagar, Nalkora, Paikardanga, Pifa and Gobindapur Water Supply Scheme of different block under Basirhat Sub-Division within Barasat Division, P.H.E Dte. ORD/000296/2025-2026 2474/BD 17/07/2025 150 SAHA CONSTRUCTION & CO 91.30 0.00 0
320 Barasat Division Acceptance cum work order for Repairing of Pump House No.-3 & 4, construction of boundary wall & approach road at P.H.No.-3 & other allied works within Hingalganj w/s scheme (Old), Hingalganj Block under Hasnabad Sub-Division, P.H.E. Dte. ORD/000297/2023-2024 2112/BD 19/07/2023 21 GOBINDA DAS. 9.21 9.05 46
321 Barasat Division Acceptance cum work order for Construction of boundary wall at pond site for damaged portion & repairing of existing boundary wall at CWR site within Khulna Bhanderkhali w/s scheme (Zone-II), Sandeshkhali-II Block under Hasnabad Sub-Division, P.H.E. Dte. ORD/000298/2023-2024 2113/BD 19/07/2023 21 ANKUSH CONSTRUCTION & CO. 6.14 6.14 55
322 Barasat Division Acceptance cum work order for Repairing of pump house & boundary wall at P.H.-3 within Kalinagar w/s scheme (Old), Sandeshkhali-I Block under Hasnabad Sub-Division, P.H.E. Dte ORD/000299/2023-2024 2114/BD 19/07/2023 21 GOBINDA DAS. 7.21 7.21 59
323 Barasat Division Acceptance cum work order for 2 no. pump connection at PH No.-1 & 2 in connection with Augmentation for Mohanpur water supply scheme (Z-I), Minakhan block under Hasnabad Sub-Division, P.H.E. Dte. ORD/000300/2024-2025 868/HSD 07/08/2024 7 ANKUSH CONSTRUCTION & CO. 1.17 1.05 100
324 Barasat Division Formal work order for Additional pipeline and other allied works as per revised LDS in connection with Augmentation of Bodai-II Water Supply Scheme under JJM programme in Amdanga block within Barasat Sub Division, P.H.E.Dte. ORD/000301/2024-2025 2229/BD 07/08/2024 360 CHANDA CONSTRUCTION. 433.82 0.00 25
325 Barasat Division Acceptance cum work order for Repairing of pump house & construction of approach road with cement concrete at PH No.-2 for Kanaikati Kathalberia w/s scheme (Zone-I), Hingalganj Block under Hasnabad Sub-Division, P.H.E. Dte. ORD/000302/2023-2024 2116/BD 19/07/2023 15 M/S K.B.ENTERPRISE. 5.59 5.35 100
326 Barasat Division Acceptance cum work order for Repairing of pump house with boundary wall & other allied works at PH No.-1 of Barunhat Patlikhanpur w/s scheme, Hasnabad Block under Hasnabad Sub-Division, P.H.E. Dte. ORD/000303/2023-2024 2117/BD 19/07/2023 21 M/S K.B.ENTERPRISE. 7.39 7.32 100
327 Barasat Division Preparation of DPR in connection of augumentation of Donnagar Water Supply Scheme under Barasat Sub Division, P.H.E. Dte. Sl. No.-15 ORD/000308/2022-2023 562/BSD 29/06/2022 30 RADIANT 2.60 2.46 100
328 Barasat Division Acceptance cum work order for Construction of new stand post for Barunhat patlikhanpur w/s Scheme, Hasnabad block under Hasnabad Sub-Division, P.H.E. Dte ORD/000308/2023-2024 829/HSD 14/07/2023 10 PRASANTA MITRA. 2.89 2.89 100
329 Barasat Division Acceptance cum work order for Temporary approach road for movement of winch machine and other allied machineries at Head Work site within Jhikra W/S scheme, Minakhan block under Hasnabad Sub-Division P.H.E. Dte. ORD/000309/2024-2025 879/HSD 07/08/2024 10 M/S NIRMAN CONSTRUCTION. 0.75 0.75 100
330 Barasat Division Acceptance cum work order for Construction of anchor block for resting of 100 mm dia DI pipeline at different places in connection with Augmentation of Rupmari w/s scheme (Z-II), Hingalganj block under Hasnabad Sub-Division P.H.E. Dte. ORD/000310/2024-2025 881/HSD 07/08/2024 10 UNIFIED ENGINEERS' CO-OPERATIVE SOCIETYLTD. 0.93 0.91 100
331 Barasat Division Acceptance cum work order for Emergency repairing of existing FHTC along with pipe line in connection with retrofitting work at different places of Sukhdoani Mouza within Sukhdoani w/s scheme , Sandeshkhali-II block under Hasnasbad Sub-Division, P.H.E.Dte. ORD/000312/2024-2025 885/HSD 07/08/2024 10 NEW LIFE CONSTRUCTION. 0.96 0.96 100
332 Barasat Division Preparation of DPR in connection of augumentation of Matiagachha Water Supply Scheme under Barasat Sub Division, P.H.E. Dte. Sl. No.-20 ORD/000313/2022-2023 567/BSD 29/06/2022 30 RADIANT 3.27 2.76 100
333 Barasat Division Acceptance cum work order for Emergency repairing of existing FHTC along with pipe line in connection with retrofitting work at different places of Durgamandop Mouza within Durgamandop w/s scheme , Sandeshkhali-II block under Hasnasbad Sub-Division, P.H.E.Dte. ORD/000313/2024-2025 888/HSD 07/08/2024 10 SARKAR ENTERPRISE & CO. 0.94 0.93 100
334 Barasat Division Preparation of DPR in connection of augmentation of Deara Water Supply Scheme under Barasat Sub Division, P.H.E. Dte. Sl. No.-21 ORD/000314/2022-2023 568/BSD 29/06/2022 30 RADIANT 2.97 2.79 100
335 Barasat Division Acceptance cum work order for Restoration of RCC drain from Joygram Bazar Idgah to near Pintu Molla Garage for damaged portion due to laying of 150 mm dia DI Rising main of Kumarjole w/s scheme, Minakhan block under Hasnabad Sub-Division P.H.E. Dte. ORD/000317/2022-2023 1238/HSD 20/07/2022 21 JESMINE ENTERPRISE. 4.76 0.00 1
336 Barasat Division Formal work order for Construction of 150 Cum capacity 20 mtr staging height R.C.C Over Head water Reservoir as per Departmental design, drawing and specification including bored pile & pile cap at Mohanpur Zone-II in connection with Augmentation of Mohanpur water supply scheme (Zone-II), Minakhan Block under Hasnabad Sub-Division, PHE Dte. ORD/000317/2024-2025 2275/BD 12/08/2024 365 M/S B.K.ENTERPRISE. 100.39 0.00 0
337 Barasat Division Acceptance cum work order for Restoration of RCC drain from Pintu Molla Garage to N/H/O Sahidul Molla for damaged portion due to laying of 150 mm dia DI Rising main of Kumarjole w/s scheme, Minakhan block under Hasnabad Sub-Division P.H.E. Dte. ORD/000319/2022-2023 1240/HSD 20/07/2022 21 JESMINE ENTERPRISE. 4.76 0.00 1
338 Barasat Division Formal work order for Construction of 150 Cum capacity 20 mtr staging height R.C.C Over Head water Reservoir as per Departmental design, drawing and specification including bored pile & pile cap at Khulna Bhanderkhali (Zone-II) under Surface Based Water Supply Scheme Hasnabad under Hasnabad Sub-Division, PHE Dte. ORD/000321/2024-2025 2261/BD 12/08/2024 365 B.S.ENTERPRISE. (BASIRHAT) 115.79 0.00 0
339 Barasat Division Acceptance cum work order for Protection works for protection of UPVC distribution pipe line at N/H/O Laxmikanta Singh within Bermajur w/s Scheme, Sandeshkhali-II block under Hasnabad Sub-Division P.H.E. Dte. ORD/000322/2022-2023 1243/HSD 20/07/2022 15 M/S ANUBHAB CONSTRUCTION. 0.56 0.57 1
340 Barasat Division Emergent works for repairing pipe line, FHTC refining, ferrule wash with supply of sluice valve and construction of valve chamber under Augmentation work at Kamlabas W/S Scheme Bagdah block within the jurisdiction of Bongaon Sub-Division under Barasat Division, P.H.E. Dte. ORD/000322/2024-2025 490/Bon 04/04/2024 15 MONDAL & CO.(BON) 4.97 4.94 100
341 Barasat Division Acceptance cum work order for Restoration of RCC drain from Near Julfikar Molla shop to N/H/O Sariful Molla for damaged portion due to laying of 150 mm dia DI Rising main of Kumarjole w/s scheme, Minakhan block under Hasnabad Sub-Division P.H.E. Dte. ORD/000323/2022-2023 1244/HSD 20/07/2022 21 JESMINE ENTERPRISE. 3.39 0.00 1
342 Barasat Division Acceptance cum work order for Restoration of RCC drain from N/H/O Sahidul Molla to near Julfikar Molla shop for damaged portion due to laying of 150 mm dia DI Rising main of Kumarjole w/s scheme, Minakhan block under Hasnabad Sub-Division P.H.E. Dte. ORD/000325/2022-2023 1246/HSD 20/07/2022 21 JESMINE ENTERPRISE. 4.76 0.00 1
343 Barasat Division Acceptance cum Work Order for Providing Functional Household Tap Connection (FHTC) from existing and new proposed distribution system within the command area of Ghona Water Supply Scheme at Basirhat-II Block under Barasat Division, PHE Dte.(Phase-I). ORD/000332/2021-2022 1653/BD 07/09/2021 30 SRI KRISHNA CO-OP-LABOUR CONTRACT AND CONST SOC LTD. 57.32 55.48 1
344 Barasat Division Acceptance cum Work Order for Providing Functional Household Tap Connection (FHTC) from existing and new proposed distribution system within the command area of Kachua Swarupnagar Water Supply Scheme at Basirhat-II Block under Barasat Division, PHE Dte.(Phase-I). ORD/000333/2021-2022 1654/BD 07/09/2021 45 UTPAL CONSTRUCTION & CO. 86.71 85.64 1
345 Barasat Division Acceptance cum Work Order for Providing Functional Household Tap Connection (FHTC) from existing and new proposed distribution system within the command area of Mathurapur Water Supply Scheme at Basirhat-II Block under Barasat Division, PHE Dte.(Phase-I). ORD/000334/2021-2022 1655/BD 07/09/2021 45 CHANCHAL ENTERPRISE & CO. 85.87 83.61 1
346 Barasat Division Acceptance cum Work Order for Providing Functional Household Tap Connection (FHTC) from existing and new proposed distribution system within the command area of Mirzanagar Water Supply Scheme at Basirhat-II Block under Barasat Division, PHE Dte.(Phase-I). ORD/000335/2021-2022 1656/BD 07/09/2021 45 CHANCHAL ENTERPRISE & CO. 85.87 83.50 1
347 Barasat Division Acceptance cum Work Order for Providing Functional Household Tap Connection (FHTC) from existing and new proposed distribution system within the command area of Champapukuria Water Supply Scheme at Basirhat-II Block under Barasat Division, PHE Dte. (Phase-I). ORD/000336/2021-2022 1651/BD 07/09/2021 45 UTPAL CONSTRUCTION & CO. 71.61 70.23 1
348 Barasat Division Acceptance cum Work Order for Providing Functional Household Tap Connection (FHTC) from existing and new proposed distribution system within the command area of Dhopaberia Water Supply Scheme at Basirhat-II Block under Barasat Division, PHE Dte. (Phase-I). ORD/000337/2021-2022 1652/BD 07/09/2021 30 UTPAL CONSTRUCTION & CO. 53.77 52.68 1
349 Barasat Division Formal work order for Construction of 150 Cum capacity 20 mtr staging height R.C.C Over Head water Reservoir as per Departmental design, drawing and specification including bored pile & pile cap in connection with Augmentation of Chandpur water supply scheme (Zone-I), Hasnabad Block under Hasnabad Sub-Division, PHE Dte. ORD/000337/2024-2025 2329/BD 16/08/2024 365 GOPINATH ENTERPRISES 100.59 0.00 0
350 Barasat Division Acceptance cum work order for Providing Functional Household Tap Connection (FHTC) in Dholkhali & Tongtala mouza including laying of UPVC/PVC pipe & supply of necessary fittings within Bouthakurani w/s scheme, Sandeshkhali-II block under Hasnabad Sub-Division, PHE Dte. ORD/000338/2021-2022 1670/BD 08/09/2021 30 SRI KRISHNA CO-OP-LABOUR CONTRACT AND CONST SOC LTD. 49.88 48.93 1
351 Barasat Division Acceptance cum work order for Providing Functional Household Tap Connection (FHTC) in diff. mouza including laying of UPVC/PVC pipe & supply of necessary fittings within Champali w/s scheme, Minakhan block under Hasnabad Sub-Division, PHE Dte. (Phase-I) ORD/000339/2021-2022 1671/BD 08/09/2021 45 M/S NIRMAN CONSTRUCTION. 77.70 76.48 1
352 Barasat Division Acceptance cum work order for Construction of Boundary Wall (110 m Length) for Pump House No - 1 of Gaighata water Supply Scheme in connection with Augmentation work under JJM project within the jurisdiction of Habra Sub-Division under Barasat Division P.H.E.Dte. ORD/000339/2024-2025 2283/BD 13/08/2024 160 PUSPA CONSTRUCTION. 16.34 0.00 0
353 Barasat Division Acceptance cum work order for Providing Functional Household Tap Connection (FHTC) in diff. mouza including laying of UPVC/PVC pipe & supply of necessary fittings within Noorpur w/s scheme, Minakhan block under Hasnabad Sub-Division, PHE Dte. (Phase-I) ORD/000340/2021-2022 1672/BD 08/09/2021 45 MONDAL & CO. (BASIRHAT). 84.12 82.46 1
354 Barasat Division Acceptance cum work order for Construction of Boundary Wall (70 m Length) for Pump House No - 2 of Gaighata water Supply Scheme in connection with Augmentation work under JJM project within the jurisdiction of Habra Sub-Division under Barasat Division P.H.E.Dte. ORD/000341/2024-2025 2285/BD 13/08/2024 20 VAI ENTERPRISE. 11.03 0.00 100
355 Barasat Division Acceptance cum work order for Providing Functional Household Tap Connection(FHTC) from existing and new proposed distribution system within the command area of Raghunathpur Water Supply Scheme at Basirhat - II Block under Barasat Division, PHE Dte. (Phase - I) ORD/000342/2021-2022 1673/BD 08/09/2021 30 SHIBU BISWAS. 48.80 48.11 1
356 Barasat Division Construction of Service Road (55 Mtr. Length X 2 Mtr. Width) for Pump House No:2 of kamarpur Water Supply Scheme in connection with Augmentation work under JJM project within the jurisdiction of Habra Sub-Division under Barasat Division, PHE Dte. ORD/000342/2024-2025 693/HAB 25/07/2024 10 G.P.ENTERPRISE. 1.22 0.00 0
357 Barasat Division Construction of Service Road (35 Mtr. Length X 2 Mtr. Width) for Pump House No:3 of kankpul Water Supply Scheme in connection with Augmentation work under JJM project within the jurisdiction of Habra Sub-Division under Barasat Division, PHE Dte. ORD/000343/2024-2025 694/HAB 25/07/2024 10 DEBASISH SARKAR. 2.14 0.00 0
358 Barasat Division Acceptance cum Work Order for Hiring of 1(one) number vehicle of category Motor Cab/Maruti Omni(standard)(Non Air-conditioned) with Diesel/LPG/CNG Engine)[not more than 5 (five) years old] including Driver for performing the inspection works and official duties for the office of the Assistant Engineer, Barrackpore Sub-Division, P.H.E. Dte. at Barrackpore, Kolkata-700120, district- North 24Pgns, W.B. ORD/000344/2021-2022 432/BKP 27/07/2021 12 GOPAL SINGHA. 1.49 0.65 1
359 Barasat Division Acceptance cum work order for Providing Functional Household Tap Connection(FHTC) from existing and new proposed distribution system within the command area of Raharhati Water Supply Scheme at Basirhat - II Block under Barasat Division, PHE Dte. (Phase - I) ORD/000345/2021-2022 1674/BD 08/09/2021 30 SRI KRISHNA CO-OP-LABOUR CONTRACT AND CONST SOC LTD. 57.32 55.29 1
360 Barasat Division Acceptance cum work order for Construction of Boundary wall, Approach Road, Earth Filling and Construction of 3.60 mtr. X 3.00 mtr. size Guard Room with sanitary and water supply arrangement incl. plinth protection at OHR site of Chhayagharia Water Supply Scheme (Z-I), Bongaon Block within the jurisdiction of Bongaon Sub-Division under Barasat Division, P.H.E. Dte. ORD/000347/2024-2025 2420/BD 23/08/2024 60 ACHINTA KUMAR HALDER. 28.75 0.00 0
361 Barasat Division Acceptance cum work order for Construction of Boundary wall, Approach Road, Earth Filling and Construction of 3.60 mtr. X 3.00 mtr. size Guard Room with sanitary and water supply arrangement incl. plinth protection at OHR site of Chhaygharia (Zone-II) Water Supply Scheme, Bongaon Block within the jurisdiction of Bongaon Sub-Division under Barasat Division, P.H.E. Dte. ORD/000348/2024-2025 2357/BD 20/08/2024 405 B.S.ENTERPRISE. (BASIRHAT) 45.95 4.58 15
362 Barasat Division Acceptance cum work order for Construction of Boundary wall, Approach Road, Earth Filling and Construction of 3.60 mtr. X 3.00 mtr. size Guard Room with sanitary and water supply arrangement incl. plinth protection at OHR site of Chhaygharia (Zone-III) Water Supply Scheme, Bongaon Block within the jurisdiction of Bongaon Sub-Division under Barasat Division, P.H.E. Dte. ORD/000349/2024-2025 2419/BD 23/08/2024 60 ONKAR ENTERPRISE. 42.48 0.00 0
363 Barasat Division Acceptance cum work order for Providing Functional Household Tap Connection(FHTC) from existing and new proposed distribution system within the command area of Gotra Water Supply Scheme at Basirhat - I Block under Barasat Division, PHE Dte. (Phase - I). ORD/000350/2021-2022 1676/BD 08/09/2021 45 M/S NIRMAN CONSTRUCTION. 86.18 84.63 1
364 Barasat Division Acceptance cum work order for Construction of Boundary wall, Approach Road, Earth Filling and Construction of 3.60 mtr. X 3.00 mtr. size Guard Room with sanitary and water supply arrangement incl. plinth protection at OHR site of Kalupur Water Supply Scheme, Bongaon Block within the jurisdiction of Bongaon Sub-Division under Barasat Division, P.H.E. Dte. ORD/000350/2024-2025 2417/BD 23/08/2024 60 ROY CHOWDHURY CONSTRUCTION. 37.80 0.00 0
365 Barasat Division Acceptance cum work order for Construction of Boundary wall, Approach Road, Earth Filling and Construction of 3.60 mtr. X 3.00 mtr. size Guard Room with sanitary and water supply arrangement incl. plinth protection at OHR site of Chowberia Water Supply Scheme, Bongaon Block within the jurisdiction of Bongaon Sub-Division under Barasat Division, P.H.E. Dte. ORD/000352/2024-2025 2418/BD 23/08/2024 420 M/S B.K.ENTERPRISE. 35.07 0.00 100
366 Barasat Division Formal work order for Providing Functional House Hold Tap Connection (FHTC) from existing and new proposed distribution system for Augmentation of Kosdelpur & Adj. Mouzas Water Supply Scheme within the jurisdiction of Habra Sub-Division under Barasat Division, P.H.E. Dte. ORD/000353/2022-2023 2200/BD 26/07/2022 90 H.I.ENTERPRISE. 333.61 333.61 1
367 Barasat Division Acceptance cum work order for Construction of Boundary wall, Approach Road, Earth Filling and Construction of 3.60 mtr. X 3.00 mtr. size Guard Room with sanitary and water supply arrangement incl. plinth protection at OHR site of Basghata Water Supply Scheme, Bagdah Block within the jurisdiction of Bongaon Sub-Division under Barasat Division, P.H.E. Dte. ORD/000353/2024-2025 2358/BD 20/08/2024 420 MD.SALIM GAZI. 25.84 0.00 75
368 Barasat Division Acceptance cum work order for Sinking of 2 nos. 300 mm. x 200 mm. dia. 360 mtr deep Tubewell by D.R. Rig method at Pump House No.- 1 & 2 with PVC pipe & strainer having 300mm dia 36 mtr. long housing pipe & 200mm dia 30 mtr. long filter for Ashariya Narayanpur w/s scheme, Hasnabad block under Hasnabad Sub-Division, P.H.E. Dte. ORD/000355/2022-2023 2235/BD 28/07/2022 30 M/S K.P.PAL. 44.42 18.62 1
369 Barasat Division Acceptance cum work order for Construction of the Boundary wall in Pump House No. 2 of Maslandapur- II Piped Water Supply Scheme in connection with Augmentation work under JJM project within the jurisdiction of Habra Sub-Division under Barasat Division, PHE Dte. ORD/000355/2024-2025 2410/BD 22/08/2024 35 M/S MITRA CONSTRUCTION 5.71 0.00 0
370 Barasat Division Acceptance cum work order for Sinking of 2 nos. 300 mm. x 200 mm. dia. 360 mtr deep Tubewell by D.R. Rig method at Pump House No.- 1 & 2 with PVC pipe & strainer having 300mm dia 36 mtr. long housing pipe & 200mm dia 30 mtr. long filter for Fakiratakia w/s scheme, Sandeshkhali-I block under Hasnabad Sub-Division, P.H.E. Dte. ORD/000358/2022-2023 2236/BD 28/07/2022 30 M/S K.P.PAL. 44.41 15.19 1
371 Barasat Division Construction of Service Road (20 Mtr. Length & 2 Mtr. Width) for Pump House No:3 of Bergum Piped Water Supply Scheme in connection with Augmentation work under JJM project within the jurisdiction of Habra Sub-Division under Barasat Division, PHE Dte. ORD/000358/2024-2025 702/HAB 30/07/2024 15 ANJALI CONSTRUCTION. 1.11 0.00 0
372 Barasat Division Acceptance cum work order for Sinking of 2 nos. 300 mm. x 200 mm. dia. 360 mtr deep Tubewell by D.R. Rig method at Pump House No.- 1 & 2 with PVC pipe & strainer having 300mm dia 36 mtr. long housing pipe & 200mm dia 30 mtr. long filter for Boyermari Abad w/s scheme, Sandeshkhali-I block under Hasnabad Sub-Division, P.H.E. Dte. ORD/000359/2022-2023 2237/BD 28/07/2022 30 M/S K.P.PAL. 44.40 28.38 1
373 Barasat Division Acceptance cum work order for Sinking of 2 nos. 300 mm. x 200 mm. dia. 360 mtr deep Tubewell by D.R. Rig method at Pump House No.- 1 & 2 with PVC pipe & strainer having 300mm dia 36 mtr. long housing pipe & 200mm dia 30 mtr. long filter for Malancha w/s scheme (Zone-II), Minakhan block under Hasnabad Sub-Division, P.H.E. Dte. ORD/000362/2022-2023 2240/BD 28/07/2022 30 M/S K.P.PAL. 44.40 35.80 1
374 Barasat Division Acceptance cum work order for Sinking of 1(one) no. 300mm x 200 mm. dia. Tube well 250 mtr deep by D.R. method with UPVC pipe & strainer having 300mm dia 36 mtr. Long housing pipe & 200 mm dia 30 mtr. long filter at Bharatpur water supply scheme under Bongaon Sub-Division P.H.E.Dte. ORD/000363/2022-2023 2241/BD 28/07/2022 30 MONDAL ENTERPRISE. (BARASAT) 14.32 12.40 1
375 Barasat Division Repairing & renovation of Pump House No. - 1 & 2 of Deora W/S scheme within the jurisdiction of Habra Sub-Division under Barasat Division, P.H.E. Dte. ORD/000366/2022-2023 389/HAB 21/07/2022 30 M/S SAMIT CHANDRA DEY. 2.09 2.06 0
376 Barasat Division Repairing of Pump House No 1 at Rajandrapur Water Supply Scheme under Basirhat Sub-Division P.H.E. Dte. ORD/000369/2021-2022 1236 /BHTSD 16/09/2021 20 MD AMIRUL MOLLA. 0.64 0.45 1
377 Barasat Division Acceptance Cum Work order for Sinking of 2 nos. 300 mm. x 200 mm. dia. 360 mtr deep Tubewell by D.R. Rig method at Pump House No.- 1 & 2 with PVC pipe & strainer having 300mm dia 36 mtr. long housing pipe & 200mm dia 30 mtr. long filter within Nityaberia w/s scheme, Sandeshkhali-I block under Hasnabad Sub-Division, P.H.E. Dte. ORD/000369/2022-2023 2245/BD 28/07/2022 30 M/S K.P.PAL. 54.44 36.84 0
378 Barasat Division Acceptance cum work order for Sinking of 2 nos. 300 mm. x 200 mm. dia. 360 mtr deep Tubewell by D.R. Rig method at Pump House No.- 1 & 2 with PVC pipe & strainer having 300mm dia 36 mtr. long housing pipe & 200mm dia 30 mtr. long filter for Noorpur w/s scheme, Minakhan block under Hasnabad Sub-Division, P.H.E. Dte. ORD/000370/2022-2023 2438/BD 22/08/2022 30 AUXILIARY TUBE WELL DRILLERS. 44.41 22.14 54
379 Barasat Division Acceptance cum work order for Sinking of 2 nos. 300 mm. x 200 mm. dia. 360 mtr deep Tubewell by D.R. Rig method at Pump House No.- 1 & 2 with PVC pipe & strainer having 300mm dia 36 mtr. long housing pipe & 200mm dia 30 mtr. long filter for Champali w/s scheme, Minakhan block under Hasnabad Sub-Division, P.H.E. Dte. ORD/000371/2022-2023 2436/BD 22/08/2022 30 AUXILIARY TUBE WELL DRILLERS. 44.41 37.78 100
380 Barasat Division Acceptance cum work order for Sinking of 2 nos. 300 mm. x 200 mm. dia. 360 mtr deep Tubewell by D.R. Rig method at Pump House No.- 1 & 2 with PVC pipe & strainer having 300mm dia 36 mtr. long housing pipe & 200mm dia 30 mtr. long filter for Kumarjole w/s scheme, Minakhan block under Hasnabad Sub-Division, P.H.E. Dte. ORD/000372/2022-2023 2437/BD 22/08/2022 30 AUXILIARY TUBE WELL DRILLERS. 44.41 32.03 100
381 Barasat Division Acceptance cum work order for Laying of 90 mm dia. UPVC pipe line from Boltala Kalupara More to near Katakhali Madrasa within Hingalganj W/S Scheme (Z-I), Hingalganj block under Hasnasbad Sub-Division, P.H.E.Dte. ORD/000377/2022-2023 937/HSD 07/06/2022 10 TRISHA ENTERPRISE & CO. 3.19 3.19 1
382 Barasat Division Continuation work order for Hiring 1(One) No. Diesel Luxury Car on Daily basis for 6 (six) months for the office use of the Assistant Engineer, Barasat Sub Division, P.H.E. Dte. @ Rs. 475.00 (Rupees four hundred and seventy five only) per day excluding fuel. (Period from 01/09/2024 to 28/02/2024) ORD/000377/2024-2025 504/BSD 29/08/2024 183 ANJALI ENTERPRISE. 0.86 0.47 0
383 Barasat Division Acceptance cum work order for Protection works for newly laid 200mm dia. UPVC pipe line at N/H/O Susanta Ghosh at Hingalganj within Hingalganj w/s scheme (Zone-I), Hingalganj block under Hasnabad Sub-Division P.H.E. Dte. ORD/000378/2022-2023 935/HSD 07/06/2022 10 MONDAL & CO. (BASIRHAT). 2.36 0.00 1
384 Barasat Division Acceptance cum work order for Laying of different dia. UPVC pipe line for damage portion due to construction of concrete road at Mamudpur Purba & Paschim para within Hingalganj W/S Scheme (Z-I), Hingalganj block under Hasnasbad Sub-Division, P.H.E.Dte. ORD/000379/2022-2023 936/HSD 07/06/2022 10 MONDAL & CO. (BASIRHAT). 3.37 3.37 1
385 Barasat Division Acceptance cum work order for Protection work for newly laid UPVC pipe line at different places of Moilobi Para in Rampur Mouza in connection with retrofitting of Rampur w/s scheme, Sandeshkhali-II block under Hasnabad Sub- Division P.H.E. Dte. ORD/000380/2022-2023 1318/HSD 02/08/2022 10 R.K.MANDAL & CO. 4.81 4.76 1
386 Barasat Division Acceptance cum work order for Protection work for newly laid UPVC pipe line at different places of Gayen para in Rampur Mouza in connection with retrofitting of Rampur w/s scheme, Sandeshkhali-II block under Hasnabad Sub- Division P.H.E. Dte. ORD/000381/2022-2023 1319/HSD 02/08/2022 10 SARKAR ENTERPRISE & CO. 3.98 3.97 1
387 Barasat Division Acceptance cum work order for Protection work for newly laid UPVC pipe line at different places of Rampur Hat khola para in Rampur Mouza in connection with retrofitting of Rampur w/s scheme, Sandeshkhali-II block under Hasnabad Sub- Division P.H.E. Dte. ORD/000382/2022-2023 1320/HSD 02/08/2022 10 BARNALI DUTTA 3.91 3.88 1
388 Barasat Division Acceptance cum work order for Protection work for newly laid UPVC pipe line at different places of Kachari para in Damakhali Mouza in connection with retrofitting of Rampur w/s scheme, Sandeshkhali-II block under Hasnabad Sub- Division P.H.E. Dte. ORD/000383/2022-2023 1321/HSD 02/09/2022 10 ABDUL HAMID GAZI. 4.05 4.04 1
389 Barasat Division Acceptance cum work order for Protection of newly laid different dia UPVC/DI pipeline by UC bullah pile at N/H/O Sibu Sardar at Boyermari Sardar para in connection with retrofitting of Chunchura w/s scheme, Sandeshkhali-I block under Hasnabad Sub- Division P.H.E. Dte. ORD/000384/2022-2023 1322/HSD 02/08/2022 10 M/S ANUBHAB CONSTRUCTION. 4.42 4.42 1
390 Barasat Division Acceptance cum work order for Protection of newly laid different dia UPVC/DI pipeline by UC bullah pile at N/H/O Sibu Gayen at Boyermari Das para in connection with retrofitting of Chunchura w/s scheme, Sandeshkhali-I block under Hasnabad Sub- Division P.H.E. Dte. ORD/000385/2022-2023 1323/HSD 02/08/2022 10 M/S ANUBHAB CONSTRUCTION. 4.50 4.50 1
391 Barasat Division Acceptance cum work order for Protection of newly laid different dia UPVC/DI pipeline by UC bullah pile at N/H/O Shibcharan Mahato, Chottu Mahato, Arabinda Mahato, Gopal Mahato & Chitta Mahato at Boyermari Mahato para in connection with retrofitting of Chunchura w/s scheme, Sandeshkhali-I block under Hasnabad Sub- Division P.H.E. Dte. ORD/000386/2022-2023 1324/HSD 02/08/2022 10 KABASI ENTERPRISE. 4.72 4.71 1
392 Barasat Division Acceptance cum work order for Protection of newly laid different dia UPVC/DI pipeline by UC bullah pile at N/H/O Sankar Pradhan, Uttam Das at Pradhan para & N/H/O Asraf Molla at Gazi para in connection with retrofitting of Chunchura w/s scheme, Sandeshkhali-I block under Hasnabad Sub- Division P.H.E. Dte. ORD/000387/2022-2023 1325/HSD 02/08/2022 10 SRI KRISHNA CO-OP-LABOUR CONTRACT AND CONST SOC LTD. 4.82 0.00 1
393 Barasat Division Acceptance cum work order for Protection of newly laid different dia UPVC/DI pipeline by UC bullah pile at N/H/O Nishith Patra, Tapas Patra at Boyermari Patra para & N/H/O Ramesh Mahato at Boyermari Mahato para in connection with retrofitting of Chunchura w/s scheme, Sandeshkhali-I block under Hasnabad Sub- Division P.H.E. Dte. ORD/000388/2022-2023 1326/HSD 02/08/2022 10 SARKAR ENTERPRISE 4.81 4.79 1
394 Barasat Division Acceptance cum work order for Protection of newly laid UPVC pipe line by bamboo pilling at N/H/O Sukumar Mahato to N/H/O Mansaram Mahato at 6 no. Boyermari in connection with retrofitting of Chunchura w/s scheme, Sandeshkhali-I block under Hasnabad Sub- Division P.H.E. Dte. ORD/000389/2022-2023 1327/HSD 02/08/2022 10 M/S K.B.ENTERPRISE. 4.52 4.52 1
395 Barasat Division Acceptance cum work order for Protection of newly laid UPVC pipe line by bamboo pilling at N/H/O Nirmal Sardar, Rohit Sardar, Naren Mali, Basudeb Mali at Boyermari Mali para & N/H/O Bablu Singh at Boyermari Choto Singh para in connection with retrofitting of Chunchura w/s scheme, Sandeshkhali-I block under Hasnabad Sub- Division P.H.E. Dte. ORD/000390/2022-2023 1328/HSD 02/08/2022 10 M/S LALTI ENTERPRISE 3.63 3.63 1
396 Barasat Division Acceptance cum work order for Emergent restoration of road for damage portion due to newly laid different dia HDPE/UPVC distribution pipe line from Molla store to Abu baktar shop at Rampur Bazaar in connection with retrofitting of Rampur w/s scheme, Sandeshkhali-II block under Hasnabad Sub-Division P.H.E. Dte. ORD/000391/2022-2023 1330/HSD 02/08/2022 10 S.S.ENTERPRISE. (BAMANGACHI) 2.60 2.59 1
397 Barasat Division Acceptance cum work order for Emergent restoration of road for damage portion due to newly laid different dia HDPE/UPVC distribution pipe line From Abu Baktar to Toto stand at Rampur Bazaar in connection with retrofitting of Rampur w/s scheme, Sandeshkhali-II block under Hasnabad Sub-Division P.H.E. Dte. ORD/000393/2022-2023 1332/HSD 02/08/2022 15 S.S.ENTERPRISE. (BAMANGACHI) 3.98 3.95 1
398 Barasat Division Acceptance cum work order for Emergent restoration by laying of 75 mm dia. HDPE distribution pipe line from PWD road to Hingalganj Police Station, PWD road to Hingalganj BDO office & BDO office to BDO quarter for damage portion in connection with retrofitting of Hingalganj w/s scheme (Z-I), Hingalganj Block under Hasnabad Sub- Division P.H.E. Dte. ORD/000394/2022-2023 1333/HSD 02/08/2022 15 MONDAL & CO. (BASIRHAT). 4.83 4.83 1
399 Barasat Division Acceptance cum work order forProtection of newly laid UPVC pipe line by bamboo pilling at different places at Agarhati mouza in connection with retrofitting of Laukhali w/s scheme, Sandeshkhali-I block under Hasnabad Sub-Division P.H.E. Dte. ORD/000395/2022-2023 1334/HSD 02/08/2022 10 K.T.ENGINEERING & CO. 4.47 4.46 1
400 Barasat Division Acceptance cum work order for Construction of anchor block for resting of 250 mm dia DI pipeline at different places in connection with Augmentation of Murarisha w/s scheme, Hasnabad block under Hasnabad Sub-Division P.H.E. Dte. ORD/000395/2024-2025 873/HSD 07/08/2024 10 NEW MANGES INDUSTRIAL CORPORATION 0.95 0.94 100
401 Barasat Division Acceptance cum work order for Protection of newly laid UPVC pipe line by bamboo pilling at different places at Laukhali Patharghata mouza in connection with retrofitting of Laukhali w/s scheme, Sandeshkhali-I block under Hasnabad Sub-Division P.H.E. Dte. ORD/000396/2022-2023 1335/HSD 02/08/2022 10 NIKHIL SAMADDAR 4.50 4.48 1
402 Barasat Division Acceptance cum work order for Protection of newly laid UPVC pipe line by bamboo pilling near Baba Loknath Mandir, N/H/O Kalu Singh, Subrata Mondal at Rajbari Sundariakhali and other different places at Laukhali village in connection with retrofitting of Laukhali w/s scheme, Sandeshkhali-I block under Hasnabad Sub-Division P.H.E. Dte. ORD/000397/2022-2023 1336/HSD 02/08/2022 10 NIKHIL SAMADDAR 4.52 4.51 1
403 Barasat Division Acceptance cum work order for Emergent restoration by laying of 140/110/90/75 mm dia. HDPE distribution pipe line from Bankra Bazar to Rupamari more due to widening & strengthening of PWD road in connection with retrofitting of Hingalganj w/s scheme (Z-II), Hingalganj Block under Hasnabad Sub- Division P.H.E. Dte. ORD/000398/2022-2023 1337/HSD 02/08/2022 15 M/S NIRMAN CONSTRUCTION. 4.29 4.29 1
404 Barasat Division Connection of 2 nos. newly sunk Replaced Tube well with rising main by DI pipe and I.E.P. back wash pipe line with UPVC pipe, Construction of Valve Chamber and Inspection pit and repairing Air-Blower and Air-Compressor of existing I.E.P. due to submerged in water during moon soon for Augmentation of Ramnagar W/S Scheme, Gaighata Block within the jurisdiction of Bongaon Sub-Division under Barasat Division, P.H.E. Dte. ORD/000398/2025-2026 815/Bon 26/06/2025 45 A.D.ENTERPRISE. 4.96 0.00 0
405 Barasat Division Acceptance cum work order for Emergent restoration of road for damage portion due to newly laid different dia HDPE/UPVC distribution pipe line From Khaja baba Fish arot to Mamoni Builder's at Rampur Bazaar in connection with retrofitting of Rampur w/s scheme, Sandeshkhali-II block under Hasnabad Sub-Division P.H.E. Dte. ORD/000399/2022-2023 1338/HSD 02/08/2022 15 S.S.ENTERPRISE. (BAMANGACHI) 4.17 4.11 1
406 Barasat Division Repairing and renovation of 150 Cum C.W.R. for Augmentation of Chikanpara Water Supply Scheme within the jurisdiction of Bongaon Sub-Division under Barasat Division, P.H.E. Dte. ORD/000399/2025-2026 816/Bon 26/06/2025 45 MA CONSTRUCTION. 1.80 0.00 0
407 Barasat Division Acceptance cum work order for Emergent restoration of road for damage portion due to newly laid different dia HDPE/UPVC distribution pipe line From Mamoni Builder's to Molla store at Rampur Bazaar in connection with retrofitting of Rampur w/s scheme, Sandeshkhali-II block under Hasnabad Sub-Division P.H.E. Dte. ORD/000400/2022-2023 1339/HSD 02/08/2022 15 S.S.ENTERPRISE. (BAMANGACHI) 2.97 2.91 1
408 Barasat Division Continuation work order Hiring of 1 no. of Diesel Luxury Car (Euro ¿ IV/VI) in good condition (traffic worthy) on daily basis for office use of the Assistant Engineer, for supervision of J.J.M. related work, executed within the entire jurisdiction of Habra Sub-Division, under Barasat Division P.H.E. Dte. (For the period from :01.09.24 to 28.02.25) = six months ORD/000400/2024-2025 780/HAB 28/08/2024 184 M/S SUKANTA ENTERPRISE. 0.86 1.79 100
409 Barasat Division Repairing and renovation of 150 Cum C.W.R. for Augmentation of Helencha Water Supply Scheme within the jurisdiction of Bongaon Sub-Division under Barasat Division, P.H.E. Dte. ORD/000400/2025-2026 817/Bon 26/06/2025 45 KAMAL HALDER. 2.15 0.00 0
410 Barasat Division Acceptance cum work order for Emergent restoration by laying of 90 mm dia. HDPE distribution pipe line from near Electric power house to Bankra Bazar due to widening & strengthening of PWD road in connection with retrofitting of Hingalganj w/s scheme (Z-I), Hingalganj Block under Hasnabad Sub- Division P.H.E. Dte. ORD/000402/2022-2023 1340/HSD 02/08/2022 15 MONDAL & CO. (BASIRHAT). 4.81 4.81 1
411 Barasat Division Acceptance cum work order for Construction of 150 cum capacity CWR , pipe connection and cost of pipes, specials for Augmentation of Kanaikati Kathalberia water supply scheme (Zone-I), Hingalganj Block under Hasnabad Sub-Division, PHE Dte. under Barasat Division, P.H.E Dte. ORD/000402/2024-2025 2520/BD 02/09/2024 180 SARKAR ENTERPRISE & CO. 43.88 0.00 0
412 Barasat Division Acceptance cum work order for Emergent restoration by laying of 200/180/160 mm dia. HDPE distribution pipe line from Kathabari more to Rupamari more due to widening & strengthening of PWD road in connection with retrofitting of Hingalganj w/s scheme (Z-II), Hingalganj Block under Hasnabad Sub- Division P.H.E. Dte. ORD/000403/2022-2023 1341/HSD 02/08/2022 15 M/S NIRMAN CONSTRUCTION. 4.66 4.66 1
413 Barasat Division Acceptance cum work order for Construction of Boundary Wall (90 m Length) for Pump House no 1 of Talsa & Adj Mouzas water Supply Scheme in connection with Augmentation work under JJM project with in the jurisdiction of Habra Sub-Division under Barasat Division P.H.E.Dte. ORD/000403/2024-2025 2583/BD 05/09/2024 45 BRIGHT STAR CO-OP LABOUR CONTRACTOR & CONSTRUCTION SOCIETY LTD. 14.76 0.00 0
414 Barasat Division Acceptance cum work order for Restoration of Concrete roads and emergency protection work under different places of Kachua Swarupnagar Water Supply Scheme within Basirhat Sub-Division under Barasat Division P.H.E.Dte. ORD/000403/2025-2026 2673/BD 30/07/2025 30 ALAM ENTERPRISE 7.99 0.00 0
415 Barasat Division Acceptance cum work order for Construction of Boundary Wall (75 m Length) for Pump House No - 3 of Kankpul water Supply Scheme in connection with Augmentation work under JJM project within the jurisdiction of Habra Sub-Division under Barasat Division P.H.E.Dte. ORD/000405/2024-2025 2581/BD 05/09/2024 45 NEW MA TARA ENTERPRISE. 11.91 0.00 0
416 Barasat Division Acceptance cum work order for Hiring Petrol Luxury Car on Daily basis (from20.08.2024 to 28.02.2025) for the office use of the Assistant Engineer(HQ), Barasat Division, PHE Dte ORD/000406/2024-2025 2341/BD 16/08/2024 193 M/S B.K.ENTERPRISE. 0.92 1.97 0
417 Barasat Division Formal work order for Additional Laying of DI Rising main & UPVC distribution pipe line, protection works & other allied works within Katakhali w/s scheme, Hasnabad Block under Hasnabad Sub-Division, PHE Dte. ORD/000407/2024-2025 2738/BD 20/09/2024 240 SRI KRISHNA CO-OP-LABOUR CONTRACT AND CONST SOC LTD. 211.44 56.21 75
418 Barasat Division Acceptance cum work order for Supply of one motor launch on daily hire basis for use of Hasnabad Sub-Division, P.H.E. Dte. for the period from 01.09.2024 to 01.09.2025. ORD/000411/2024-2025 2484/BD 29/08/2024 366 SUSMITA MANDAL. 13.34 0.00 20
419 Barasat Division Continuation Work Order for Hiring of 1(one) number vehicle of Category Motor Cab/Maruti Omni(standard)(Non Air-Conditioned)/LPG/CNG Engine including Driver for performing the inspection works and official duties for the office of the Assistant Engineer, Barrackpore Sub-Division, P.H.E. Dte. at Barrackpore, Kolkata-700122, District- North 24Pgns, W.B.(period from 01.08.2024 to 31.01.2025) ORD/000412/2024-2025 461/BKP 12/07/2024 184 GOPAL SINGHA. 0.87 2.01 0
420 Barasat Division Formal work order for Providing Functional House Hold Tap Connection (FHTC) from existing and new proposed distribution system for Augmentation of Talsa Water Supply Scheme within the jurisdiction of Habra Sub-Division under Barasat Division, P.H.E. Dte. ORD/000413/2022-2023 2312/BD 03/08/2022 90 DEBAPRASAD MONDAL. 295.79 217.73 100
421 Barasat Division Formal work order for Providing Functional House Hold Tap Connection (FHTC) from existing and new proposed distribution system for Augmentation of Talsa & Adj. Mouzas Water Supply Scheme within the jurisdiction of Habra Sub-Division under Barasat Division, P.H.E. Dte. ORD/000414/2022-2023 2313/BD 03/08/2022 90 M/S B.K.ENTERPRISE. 230.62 208.82 1
422 Barasat Division Formal work order for Additional Laying of UPVC distribution pipe line and Providing Functional Household Tap Connection for the leftout portion in connection with Augmentation of Kanaikathi Kathalberia water supply scheme (Z-I), Hingalganj Block under Hasnabad Sub-Division, PHE Dte. ORD/000414/2024-2025 3051/BD 24/10/2024 30 KINGS & CO. 101.79 0.00 0
423 Barasat Division Acceptance cum work order for Protection work for newly laid UPVC pipe line at different places of Rampur Haldar para in Rampur Mouza in connection with retrofitting of Rampur w/s scheme, Sandeshkhali-II block under Hasnabad Sub- Division P.H.E. Dte. ORD/000415/2022-2023 1347/HSD 03/08/2022 10 R.K.MANDAL & CO. 4.88 4.85 1
424 Barasat Division Acceptance cum work order for Protection work for newly laid UPVC pipe line at different places of Rampur notun para in Rampur Mouza in connection with retrofitting of Rampur w/s scheme, Sandeshkhali-II block under Hasnabad Sub- Division P.H.E. Dte. ORD/000416/2022-2023 1348/HSD 03/08/2022 10 SARKAR ENTERPRISE & CO. 4.17 4.16 1
425 Barasat Division Formal work order for Additional Laying of UPVC distribution pipe line, protection works & other allied works within Bamanpukuria w/s scheme, Minakhan Block under Hasnabad Sub-Division, PHE Dte. ORD/000416/2024-2025 2736/BD 20/09/2024 300 M.R.CONSTRUCTION. 130.43 0.00 70
426 Barasat Division Acceptance cum work order for Protection work for newly laid UPVC pipe line at different places of Rampur Adibasi para in Rampur Mouza in connection with retrofitting of Rampur w/s scheme, Sandeshkhali-II block under Hasnabad Sub- Division P.H.E. Dte. ORD/000417/2022-2023 1349/HSD 03/08/2022 10 R.K.MANDAL & CO. 4.76 4.73 1
427 Barasat Division Acceptance cum work order for Protection of newly laid UPVC pipe line by bamboo pilling at different places of Boyermari Pandab para & Boyermari Gazipara in connection with retrofitting of Chunchura w/s scheme, Sandeshkhali-I block under Hasnabad Sub- Division P.H.E. Dte. ORD/000418/2022-2023 1350/HSD 03/08/2022 10 ABDUL HAMID GAZI. 4.38 4.35 1
428 Barasat Division Acceptance cum work order for Protection of newly laid different dia UPVC/DI pipeline by UC bullah pile at N/H/O Laltu Sardar at Boyermari Sardar para in connection with retrofitting of Chunchura w/s scheme, Sandeshkhali-I block under Hasnabad Sub- Division P.H.E. Dte. ORD/000419/2022-2023 1351/HSD 03/08/2022 10 BASIRHAT ANCHALICK SHARAMICK THIKADARY SAMABAY SAMITY LTD. 4.42 4.37 1
429 Barasat Division Acceptance cum work order for Protection work for newly laid UPVC pipe line at different places of Refuge para in Rampur Mouza in connection with retrofitting of Rampur w/s scheme, Sandeshkhali-II block under Hasnabad Sub- Division P.H.E. Dte. ORD/000420/2022-2023 1352/HSD 03/08/2022 10 R.K.MANDAL & CO. 4.33 4.29 1
430 Barasat Division Acceptance cum work order for Protection work for newly laid UPVC pipe line at different places of Arsad Miya Bazaar in Dhamakhali Mouza in connection with retrofitting of Rampur w/s scheme, Sandeshkhali-II block under Hasnabad Sub- Division P.H.E. Dte. ORD/000421/2022-2023 1353/HSD 03/08/2022 10 SARKAR ENTERPRISE & CO. 4.73 4.56 1
431 Barasat Division Acceptance cum work order for Emergent restoration by laying of 160/110 mm dia. HDPE distribution pipe line from near SBI bank to Bankra Bazar due to widening & strengthening of PWD road in connection with retrofitting of Hingalganj w/s scheme (Z-I), Hingalganj Block under Hasnabad Sub- Division P.H.E. Dte. ORD/000423/2022-2023 1355/HSD 03/08/2022 15 MONDAL & CO. (BASIRHAT). 4.74 4.74 1
432 Barasat Division Different works in connection with Augmentation Bamangachi PWSS (1st Tubewell - Pump House, Boundary Wall & Service Road). ORD/000427/2024-2025 559/BSD 09/09/2024 20 SANTU GHOSH. 4.87 3.60 100
433 Barasat Division Acceptance cum work order for Emergent restoration of existing household tap connection at different places due to widening of PWD road from Bankra Bazar to Rupamari more in connection with retrofitting of Hingalganj w/s Scheme (Zone-II), Hingalganj block under Hasnasbad Sub-Division, P.H.E.Dte. ORD/000428/2022-2023 1356/HSD 03/08/2022 15 M/S NIRMAN CONSTRUCTION. 2.90 2.90 1
434 Barasat Division Different works in connection with Augmentation Chandrapur PWSS (1st Tubewell - Boundary Wall & Service Road). ORD/000429/2024-2025 561/BSD 09/09/2024 20 S.MUKHERJEE. 4.10 0.00 0
435 Barasat Division Different works in connection with Augmentation Chandrapur PWSS (1st Tubewell - Pump House). ORD/000430/2024-2025 562/BSD 09/09/2024 20 JIBON BOSE. 2.95 0.00 0
436 Barasat Division Acceptance cum work order for Emergent restoration of existing household tap connection at different places due to widening of PWD road from Boltala to Bankra Bazar in connection with retrofitting of Hingalganj w/s Scheme (Zone-I), Hingalganj block under Hasnasbad Sub-Division, P.H.E.Dte. ORD/000431/2022-2023 1357/HSD 03/08/2022 15 MONDAL & CO. (BASIRHAT). 4.64 4.64 1
437 Barasat Division Acceptance cum work order for Emergent restoration of different dia UPVC pipe line for damage portion at different places due widening of PWD road of Hingalganj w/s Scheme (Zone-II), Hingalganj block under Hasnasbad Sub-Division, P.H.E.Dte. ORD/000432/2022-2023 1358/HSD 03/08/2022 15 M/S NIRMAN CONSTRUCTION. 4.90 4.90 1
438 Barasat Division Acceptance cum work order for Protection work for newly laid UPVC pipe line at different places of Paschim Dhamakhali pramanik para in Damakhali Mouza in connection with retrofitting of Rampur w/s scheme, Sandeshkhali-II block under Hasnabad Sub- Division P.H.E. Dte. ORD/000433/2022-2023 1359/HSD 03/08/2022 10 RAJPATH ENGINEERS-CO-OPERATIVE SOCIETY LTD. 4.02 4.01 1
439 Barasat Division Different works in connection with Augmentation Chandrapur PWSS (3rd Tubewell - Boundary Wall & Service Road). ORD/000433/2024-2025 565/BSD 09/09/2024 20 SUN ENTERPRISE. 3.78 0.00 0
440 Barasat Division Acceptance cum work order for Protection work for newly laid UPVC pipe line at different places of Purba dhamakhali pramanik para in Dhamakhali Mouza in connection with retrofitting of Rampur w/s scheme, Sandeshkhali-II block under Hasnabad Sub- Division P.H.E. Dte. ORD/000434/2022-2023 1360/HSD 03/08/2022 10 SRI KRISHNA CO-OP-LABOUR CONTRACT AND CONST SOC LTD. 4.81 4.76 1
441 Barasat Division Acceptance cum work order for Construction of boundary wall for Back & Left side at PH No.-1 within Kanaikati Kathalberia w/s scheme (Zone-I), Hingalganj block under Hasnabad Sub-Division P.H.E. Dte. ORD/000436/2022-2023 1362/HSD 03/08/2022 21 BADAL GHOSH. 3.87 3.84 1
442 Barasat Division Acceptance cum work order for Construction of boundary wall for Front & Right side at PH No.-1 within Kanaikati Kathalberia w/s scheme (Zone-I), Hingalganj block under Hasnabad Sub-Division P.H.E. Dte. ORD/000437/2022-2023 1363/HSD 03/08/2022 21 LAHIRI CONSTRUCTION. 3.34 3.33 1
443 Barasat Division Acceptance cum work order for Construction of boundary wall for right & back side at PH No.-2 within Kanaikati Kathalberia w/s scheme (Zone-I), Hingalganj block under Hasnabad Sub-Division P.H.E. Dte. ORD/000438/2022-2023 1364/HSD 03/08/2022 21 STAR CONSTRUCTION. 3.26 3.23 1
444 Barasat Division Acceptance cum work order for Laying of UPVC Distribution pipe line and providing FHTC for augmentation of Sonepur water Supply Scheme within Swarupnagar Block under Basirhat Sub-Division PHE Dte. ORD/000438/2024-2025 782/BD 12/03/2025 50 PREMANANDA ROY BISWAS. 4.64 0.00 0
445 Barasat Division Acceptance cum work order for Construction of boundary wall for front & left side at PH No.-2 within Kanaikati Kathalberia w/s scheme (Zone-I), Hingalganj block under Hasnabad Sub-Division P.H.E. Dte. ORD/000439/2022-2023 1365/HSD 03/08/2022 21 STAR CONSTRUCTION. 2.66 2.66 1
446 Barasat Division Acceptance cum work order for Construction of boundary wall for front & left side at PH No.-2 within Kanaikati Kathalberia w/s scheme (Zone-II), Hingalganj block under Hasnabad Sub-Division P.H.E. Dte. ORD/000440/2022-2023 1366/HSD 03/08/2022 21 SHYAM SUNDAR DAS. 2.68 2.66 1
447 Barasat Division Acceptance cum work order for Construction of boundary wall for right & back side at PH No.-2 within Kanaikati Kathalberia w/s scheme (Zone-II), Hingalganj block under Hasnabad Sub-Division P.H.E. Dte. ORD/000441/2022-2023 1367/HSD 03/08/2022 21 NEW LIFE CONSTRUCTION. 3.22 3.22 1
448 Barasat Division Repair of damaged concrete road due to laying of pipe line in various place (node 711 to 718, 542 to 546, 552 to 554 ) of Gobindapur Dhokra pwss under Basirhat to Sub-Division within Barasat Division, PHE Dte. ORD/000441/2024-2025 1165/BHTSD 30/07/2024 15 SWADESH MONDAL. 0.95 0.95 100
449 Barasat Division Repair of damaged concrete road due to laying of pipe line in various place (node 549 to 551, 511 to 538, 575 to 579 ) of Gobindapur Dhokra pwss under Basirhat to Sub-Division within Barasat Division, PHE Dte. ORD/000442/2024-2025 1166/BHTSD 30/07/2024 15 PRASANTA KUMAR PAUL. 0.97 0.97 100
450 Barasat Division Repair of damaged concrete road due to laying of pipe line in various place (node 82 to 84, 84 to 86, 725 to 726, 545 to 549, 546 to 552 ) of Gobindapur Dhokra pwss under Basirhat to Sub-Division within Barasat Division, PHE Dte. ORD/000443/2024-2025 1167/BHTSD 30/07/2024 15 M/S MAA TARA ENTERPRISE 0.99 0.99 100
451 Barasat Division Repair of damaged concrete road due to laying of pipe line in various place (node 72 to 80 to 81, 73 to 74, 80 to 82, 538 to 539, 736 to 737 ) of Gobindapur Dhokra pwss under Basirhat to Sub-Division within Barasat Division, PHE Dte. ORD/000444/2024-2025 1168/BHTSD 30/07/2024 15 MD AMIRUL MOLLA. 0.98 0.98 100
452 Barasat Division Relaying of 75mm dia UPVC pipe line and repairing of FHTC connections due to damaged during construction of road by WBSRDA at Node no. 100 to 175 of Nabatkati water Supply Scheme under Basirhat Sub-Division within Barasat Division, PHE Dte. ORD/000445/2024-2025 1169/BHTSD 30/07/2024 15 M/S. WAY CON. 0.88 0.88 50
453 Barasat Division Acceptance cum work order for Protection work for newly laid UPVC pipe line at different places of samanta Para in Rampur Mouza in connection with retrofitting of Rampur w/s scheme, Sandeshkhali-II block under Hasnabad SubDivision P.H.E. Dte ORD/000446/2022-2023 1317/HSD 02/08/2022 10 MUKHERJEE CONSTRUCTION 4.85 4.85 1
454 Barasat Division Repair of OHR & Pump House and emergency repairing of pipeline in Gobindapur Dhokra W/S Scheme Under Basirhat Sub-Division P.H.E. Dte.Under Barasat Division, P.H.E.Dte. ORD/000447/2024-2025 1170/BHTSD 30/07/2024 15 SELIM GAZI. 0.95 0.94 100
455 Barasat Division Acceptance cum work order for Protection of newly laid UPVC pipe line by bamboo pilling at N/H/O Rahaman Molla, Motaleb Molla at Maliari Sekh para & Other places for Augmentation of Padmapukuria w/s scheme, Minakhan block under Hasnabad Sub- Division P.H.E. Dte. ORD/000448/2022-2023 1196/HSD 13/07/2022 10 M/S ATRI BISWAS 2.05 2.05 1
456 Barasat Division Repair of damaged concrete road due to laying of pipe line in various place (node 293 to 295, 101 to 422) of Gobindapur Dhokra pwss under Basirhat Sub-Division within Barasat Division, PHE Dte. ORD/000448/2024-2025 1161/BHTSD 30/07/2024 15 MALLICK ENTERPRISE 0.95 0.00 100
457 Barasat Division Repair of damaged concrete road due to laying of pipe line in various place (node 230 to 230A, 293 to 294, 232 to 233) of Gobindapur Dhokra pwss under Basirhat Sub-Division within Barasat Division, PHE Dte. ORD/000449/2024-2025 1162/BHTSD 30/07/2024 15 MALLICK ENTERPRISE 0.90 0.00 100
458 Barasat Division Repair of damaged concrete road due to laying of pipe line in various place (node 266A to 266B, 276 to 277, 290 to 293) of Gobindapur Dhokra pwss under Basirhat Sub-Division within Barasat Division, PHE Dte. ORD/000450/2024-2025 1163/BHTSD 30/07/2024 15 MALLICK ENTERPRISE 0.78 0.00 100
459 Barasat Division Different works in connection with Augmentation Joypul PWSS (2nd Tubewell - Pump House, Boundary Wall & Service Road). ORD/000451/2024-2025 573/BSD 10/09/2024 82 SANTU GHOSH. 3.09 0.98 100
460 Barasat Division Acceptance cum work order for Repair and renovation works of 180 cum. capacity 20 mtr. staging height R.C.C. Over Head water Reservoir alongwith rising main connection with 2nd Tube well for Augmentation of Panchita Water Supply Scheme, Bongaon Block within the jurisdiction of Bongaon Sub-Division under Barasat Division, P.H.E. Dte. ORD/000452/2024-2025 3038/BD 22/10/2024 45 DEBAPRASAD MONDAL. 15.61 0.00 0
461 Barasat Division Different works in connection with Augmentation Nebadhui Duttapukur Zone-I PWSS (1st Tubewell - Pump House). ORD/000453/2024-2025 574/BSD 10/09/2024 20 CHAKRABORTY SUPPLIERS & CONSTRUCTION. 3.24 1.20 100
462 Barasat Division Repair of damaged concrete road due to laying of pipe line in various place (node 129 to 130, 291 to 296, 509 to 507, 503 to 507, 571 to 573, 573 tp 575, 554 to 555, 65 to 66, 456 to 457 ) of Gobindapur Dhokra pwss under Basirhat to Sub-Division within Barasat Division, PHE Dte. ORD/000455/2024-2025 1164/BHTSD 30/07/2024 15 MALLICK ENTERPRISE 0.95 0.00 100
463 Barasat Division Different works in connection with Augmentation Shibalaya PWSS (1st Tubewell site - Pump House). ORD/000460/2024-2025 579/BSD 10/09/2024 20 RANA ENTERPRISE 2.66 1.69 100
464 Barasat Division Laying of pipe line at Dobila W/s scheme due to widening of PWD ROAD at Dobila Water supply scheme of Basirhat Sub-Division under Barasat Division, P.H.E. Dte. ORD/000463/2022-2023 837 /BHTSD 23/06/2022 10 M/S SUKANTA ENTERPRISE. 2.86 2.81 0
465 Barasat Division Different works in connection with Augmentation Shibalaya PWSS (2nd Tubewell site - Pump House). ORD/000463/2024-2025 581/BSD 10/09/2024 20 M/S SUKANTA ENTERPRISE. 2.65 0.00 0
466 Barasat Division Repair and Renovation Work of Pump House at 2nd Tubewell site and allied works at Nebadhui Duttapukur Zone-II Water Supply Scheme under Barasat Sub Division, P.H.E. Dte. ORD/000464/2024-2025 582/BSD 10/09/2024 82 M/S S.HAQUE & CO. 2.55 1.25 100
467 Barasat Division Acceptance cum work order for Protection work for newly laid UPVC pipe line at different places of Ghoja para in Damakhali Mouza in connection with retrofitting of Rampur w/s scheme, Sandeshkhali-II block under Hasnabad Sub- Division P.H.E. Dte. ORD/000466/2022-2023 1391/HSD 08/08/2022 10 SRI KRISHNA CO-OP-LABOUR CONTRACT AND CONST SOC LTD. 4.26 4.21 1
468 Barasat Division Acceptance cum work order for Protection work for newly laid UPVC pipe line at different places of Mistiri para in Damakhali Mouza in connection with retrofitting of Rampur w/s scheme, Sandeshkhali-II block under Hasnabad Sub- Division P.H.E. Dte. ORD/000467/2022-2023 1392/HSD 08/08/2022 10 M/S R.B.S.ENTERPRISE. 4.13 4.12 1
469 Barasat Division Dismantling of a dilapidated Room due to construction of Bio Eco Tech Plant at the Head Work site of Dakshin Chatra Zone I Water Supply Scheme under Barasat Division, P.H.E. ORD/000467/2024-2025 942/BHTSD 24/05/2024 7 N.R. ENTERPRISE 0.97 0.97 100
470 Barasat Division Acceptance cum work order for Additional laying of UPVC pipe line under Augmentation of Koniara Water Supply Scheme within the jurisdiction of Bongaon Sub-Division under Barasat Division, P.H.E. Dte. (Part - B) ORD/000467/2025-2026 2860/BD 14/08/2025 45 HAQUE ENTERPRISE 6.12 0.00 0
471 Barasat Division Construction of Culvert at Pump House - V of Chandrapur W/S Scheme under Barasat Sub. Division, PHE Dte. ORD/000468/2024-2025 509/BSD 30/08/2024 15 S.MUKHERJEE. 0.86 0.81 100
472 Barasat Division Acceptance cum work order for Special Repairing work in connection with augmentation work at total command area of Diara Water Supply Scheme, to repair the damaged pipeline due to road widening and drain construction and also to convert the 'Kapashati' mouza (JL No. 73) in to Swajal Gram within Bongaon Sub Division, under Barasat Division, P.H.E.Dte. ORD/000468/2025-2026 2859/BD 14/08/2025 45 ROY ENGINEERS. 7.98 0.00 0
473 Barasat Division Acceptance cum work order for Protection work for newly laid UPVC pipe line at different places of 50 Bigha More in Damakhali Mouza in connection with retrofitting of Rampur w/s scheme, Sandeshkhali-II block under Hasnabad Sub- Division P.H.E. Dte. ORD/000469/2022-2023 1394/HSD 08/08/2022 10 M/S B.K.ENTERPRISE. 4.09 4.08 1
474 Barasat Division Different works in connection with Augmentation Kashimpur PWSS (2nd Tubewell site - Pump House, Boundary Wall & Service Road). ORD/000472/2024-2025 587/BSD 10/09/2024 20 M/S SUKANTA ENTERPRISE. 3.36 0.00 0
475 Barasat Division Acceptance cum work order for Emergent restoration of road for damage portion due to newly laid different dia DI/UPVC distribution pipe line at different places in Chunchura mouza in connection with retrofitting of Chunchura w/s scheme, Sandeshkhali-I block under Hasnabad Sub-Division P.H.E. Dte. ORD/000473/2022-2023 1398/HSD 08/08/2022 15 ABDUL ALIM MONDAL. 4.80 4.80 1
476 Barasat Division Formal work order for Additional Laying of UPVC distribution pipe line, protection works & other allied works within Petua Dhanihati w/s scheme, Sandeshkhali-I Block under Hasnabad Sub-Division, P.H.E Dte. ORD/000473/2024-2025 2734/BD 20/09/2024 150 UNIFIED ENGINEERS' CO-OPERATIVE SOCIETYLTD. 169.19 27.14 100
477 Barasat Division Acceptance cum work order for Repairing of Pump House No.-2 within Hingalganj w/s scheme (Old), Hingalgan block under Hasnabad Sub-Division P.H.E. Dte. ORD/000474/2022-2023 1399/HSD 08/08/2022 21 RAJPATH ENGINEERS-CO-OPERATIVE SOCIETY LTD. 3.46 3.46 1
478 Barasat Division Construction of Service Road (30 Mtr. Length X 2 Mtr. Width) for Pump House No:1 of khosdelpur Water Supply Scheme in connection with Augmentation work under JJM project within the jurisdiction of Habra Sub-Division under Barasat Division, PHE Dte. ORD/000475/2024-2025 696/HAB 25/07/2024 10 M/S GUHA CONSTRUCTION. 1.83 0.00 0
479 Barasat Division Formal work order for Additional Laying of UPVC distribution pipe line, Providing FHTC for the leftout portion, protection works & other allied works in connection with Augmentation of Bermajur w/s scheme, Sandeshkhali-II Block under Hasnabad Sub-Division, PHE Dte. ORD/000476/2024-2025 2735/BD 20/09/2024 30 M/S NIRMAN CONSTRUCTION. 283.68 45.66 58
480 Barasat Division Acceptance cum Work Order for Providing Functional Household Tap Connection (FHTC) in different mouza including laying of UPVC/PVC pipe & supply of necessary fittings within Boyermari Abad Water Supply scheme Sandeshkhali-I Block under Hasnabad Sub-Division, PHE Dte.(Phase-I) ORD/000477/2021-2022 1738/BD 14/09/2021 45 DEBAPRASAD MONDAL. 81.09 78.93 1
481 Barasat Division Acceptance cum work order for Construction of boundary wall for damaged portion at PH No-2 within Hingalganj w/s scheme (Old), Hingalganj block under Hasnabad Sub-Division P.H.E. Dte. ORD/000477/2022-2023 1402/HSD 08/08/2022 21 M/S RAJPATH CONSTRUCTION. 3.62 3.61 1
482 Barasat Division Acceptance cum work order for Emergent restoration of road for damage portion due to newly laid different dia DI/UPVC distribution pipe line at different places within Boyermari mouza in connection with retrofitting of Chunchura w/s scheme, Sandeshkhali-I block under Hasnabad Sub-Division P.H.E. Dte. ORD/000479/2022-2023 1404/HSD 08/08/2022 15 M/S RAJPATH CONSTRUCTION. 4.78 4.78 1
483 Barasat Division Acceptance cum Work Order for Providing Functional Household Tap Connection (FHTC) in different mouza including laying of UPVC/PVC pipe & supply of necessary fittings within Durgamandop Water Supply scheme Sandeshkhali-II Block under Hasnabad Sub-Division, PHE Dte.(Phase-I). ORD/000481/2021-2022 1739/BD 14/09/2021 45 M/S B.K.ENTERPRISE. 77.69 77.60 1
484 Barasat Division Acceptance cum Work Order for Providing Functional Household Tap Connection (FHTC) in different mouza including laying of UPVC/PVC pipe & supply of necessary fittings within Khulna Bhandarkhali (Zone-I) Water Supply scheme Sandeshkhali-I Block under Hasnabad Sub-Division, PHE Dte.(Phase-I) ORD/000482/2021-2022 1740/BD 14/09/2021 45 M/S B.K.ENTERPRISE. 76.95 76.79 1
485 Barasat Division Acceptance cum Work Order for Providing Functional Household Tap Connection (FHTC) in different mouza including laying of UPVC/PVC pipe & supply of necessary fittings within Korakati Water Supply scheme Sandeshkhali-II Block under Hasnabad Sub-Division, PHE Dte.(Phase-I) ORD/000483/2021-2022 1741/BD 14/09/2021 45 R.K.MANDAL AND CO. 76.55 76.55 1
486 Barasat Division Acceptance cum work order for Protection work for newly laid different dia. UPVC/DI distribution pipeline at different places in Bayermari Mouza of Chunchura w/s scheme, Sandeshkhali-I block under Hasnabad Sub-Division P.H.E. Dte. ORD/000487/2022-2023 2368/BD 10/08/2022 30 SRI KRISHNA CO-OP-LABOUR CONTRACT AND CONST SOC LTD. 60.68 60.66 1
487 Barasat Division Laying of UPVC pipe line at village Khudramangalgathi in connection with FHTC work under Sohai Swetpur Zone-I Water Supply Scheme within Barasat Sub Division, P.H.E.Dte. Sl.-1 ORD/000491/2022-2023 309/BSD 11/04/2022 7 RAKESH ENTERPRISE. 4.50 4.50 1
488 Barasat Division Laying of UPVC pipe line at Culvert More towards Khudramangalgathi in connection with FHTC work under Sohai Swetpur Zone-I Water Supply Scheme within Barasat Sub Division, P.H.E.Dte. Sl. No.-02 ORD/000494/2022-2023 310/BSD 11/04/2022 7 RAKESH ENTERPRISE. 4.27 4.27 1
489 Barasat Division Road restoration work at Kalitala More to Pump House no.-1 via Swetpur Bazar in connection with laying of distribution system of pipe line with Sohai Swetpur Water Supply Scheme Zone-I under Barasat Sub Division, P.H.E.Dte. Sl. No.-07 ORD/000497/2022-2023 336/BSD 12/04/2022 7 SUN ENTERPRISE. 4.58 4.58 1
490 Barasat Division Road restoration work at Pump House no.-1 to Mirjapur High School via Pump House No.-2 in connection with laying of distribution system of pipe line with Sohai Swetpur Water Supply Scheme Zone-I under Barasat Sub Division, P.H.E.Dte. Sl. No.-08 ORD/000498/2022-2023 337/BSD 12/04/2022 7 SUN ENTERPRISE. 4.55 4.55 1
491 Barasat Division Sand filling due laying of pipe line at Dobila W/s scheme of Basirhat Sub-Division under Barasat Division, P.H.E. Dte. ORD/000505/2022-2023 845 /BHTSD 23/06/2022 10 M/S SUKANTA ENTERPRISE. 2.64 2.63 1
492 Barasat Division Continuation work order for Hiring 1(One) No. Diesel Luxury Car on Daily basis for 6 (six) months for the office use of the Assistant Engineer, Barasat Sub Division, P.H.E. Dte. @ Rs. 475.00 (Rupees four hundred and seventy five only) per day excluding fuel. (Period from 01/09/2025 to 28/02/2026) ORD/000508/2025-2026 497/BSD 26/08/2025 181 ANJALI ENTERPRISE. 0.86 0.00 0
493 Barasat Division Formal work order for Additional Laying of UPVC distribution pipe line, Providing FHTC for the leftout portion (River side), protection works & other allied works in connection with Augmentation of Boyermari Abad w/s scheme, Sandeshkhali-I Block under Hasnabad Sub-Division, PHE Dte. ORD/000512/2024-2025 3129/BD 12/11/2024 270 S.S.ENTERPRISE. (BAMANGACHI) 245.45 0.00 0
494 Barasat Division Formal Work order for Laying of UPVC distribution pipe line and providing Functional Household Tap Connection for Augmentation of Nurpur water supply scheme, Minakhan Block under Hasnabad Sub-Division, PHE Dte. ORD/000516/2022-2023 2398/BD 17/08/2022 90 M/S NIRMAN CONSTRUCTION. 183.61 179.26 1
495 Barasat Division Formal work order for for Laying of DI/UPVC distribution pipe line and providing Functional Household Tap Connection for Augmentation of Ashariya Narayanpur water supply scheme, Hasnabad Block under Hasnabad Sub-Division, PHE Dte. under barasat Division, PHE Dte. ORD/000517/2022-2023 2399/BD 17/08/2022 90 M/S DATTA ENTERPRISE. 271.42 268.98 1
496 Barasat Division Formal work order for Laying of UPVC distribution pipe line and providing Functional Household Tap Connection for Augmentation of Champali water supply scheme, Minakhan Block under Hasnabad Sub-Division, PHE Dte. ORD/000518/2022-2023 2400/BD 17/08/2022 90 SRI KRISHNA CO-OP-LABOUR CONTRACT AND CONST SOC LTD. 129.78 128.23 1
497 Barasat Division Formal work order for Laying of UPVC distribution pipe line and providing Functional Household Tap Connection for Augmentation of Durgamandop water supply scheme, Sandeshkhali-II Block under Hasnabad Sub-Division, PHE Dte. under barasat Division, PHE Dte. ORD/000519/2022-2023 2401/BD 17/08/2022 90 MONDAL & CO. (BASIRHAT). 287.51 266.78 1
498 Barasat Division Formal work order for for Laying of UPVC distribution pipe line and providing Functional Household Tap Connection for Augmentation of Bouthakurani water supply scheme (Zone-II), Sandeshkhali-II Block under Hasnabad Sub-Division, PHE Dte. under barasat Division, PHE Dte. ORD/000520/2022-2023 2402/BD 17/08/2022 90 M/S PROGATI ENTERPRISE. 238.52 236.38 1
499 Barasat Division Formal work order for Laying of UPVC distribution pipe line and providing Functional Household Tap Connection for Augmentation of Bouthakurani water supply scheme (Zone-I), Sandeshkhali-II Block under Hasnabad Sub-Division, PHE Dte. under barasat Division, PHE Dte. ORD/000521/2022-2023 2403/BD 17/08/2022 90 R.K.MANDAL & CO. 239.51 236.33 1
500 Barasat Division Formal work order for Laying of UPVC distribution pipe line and providing Functional Household Tap Connection for Augmentation of Monipur water supply scheme,Sandeshkhali-II Block under Hasnabad Sub-Division, PHE Dte. under barasat Division, PHE Dte. ORD/000522/2022-2023 2446/BD 23/08/2022 90 APURBA MANDAL 278.15 252.56 1
501 Barasat Division Formal work order for Providing Functional Household Tap Connection(FHTC) from existing and new proposed distribution system for Augmentation of Kamarpur & Adj. Mouzas water supply scheme within jurisdiction of Habra Sub-Division, PHE Dte. under barasat Division, PHE Dte. ORD/000523/2022-2023 2445/BD 23/08/2022 90 CHANDA CONSTRUCTION. 212.30 212.20 100
502 Barasat Division Formal work order for Additional Laying of UPVC distribution pipe line, protection works & other allied works within Mathbari Abad w/s scheme, Sandeshkhali-I Block under Hasnabad Sub-Division, PHE Dte. ORD/000524/2024-2025 2796/BD 25/09/2024 30 M/S PROGATI ENTERPRISE. 140.81 19.02 70
503 Barasat Division Acceptance cum work order for Sinking of 2 nos. 300 mm. x 200 mm. dia. 360 mtr deep Tubewell by D.R. Rig method at Pump House No.- 2 & 3(at defunct T/W site) with PVC pipe & strainer having 300mm dia 36 mtr. long housing pipe & 200mm dia 30 mtr. long filter for Hingalganj W/S(old) scheme, Hingalganj block under Hasnabad Sub-Division, P.H.E. Dte. ORD/000527/2022-2023 2242/BD 22/08/2022 30 ACME CONSTRUCTION 44.40 16.89 55
504 Barasat Division Acceptance cum work order for Restoration of RCC drain from Joygram Bazar Idgah to near Pintu Molla Garage for damaged portion due to laying of 150 mm dia DI Rising main of Kumarjole w/s scheme, Minakhan block under Hasnabad Sub-Division P.H.E. Dte. ORD/000528/2022-2023 1238/HSD 20/07/2022 21 JESMINE ENTERPRISE. 4.76 4.67 1
505 Barasat Division Acceptance cum work order for Restoration of RCC drain from Pintu Molla Garage to N/H/O Sahidul Molla for damaged portion due to laying of 150 mm dia DI Rising main of Kumarjole w/s scheme, Minakhan block under Hasnabad Sub-Division P.H.E. Dte. ORD/000529/2022-2023 1240/HSD 20/07/2022 21 JESMINE ENTERPRISE. 4.74 4.67 1
506 Barasat Division Acceptance cum work order for Sinking of 2 nos. 300 mm. x 200 mm. dia. 360 mtr deep Tubewell by D.R. Rig method at PH No.-1 & 2 with PVC pipe & strainer having 300mm dia 48 mtr. long housing pipe & 200mm dia 30 mtr. long filter for Augmentation of Murarisha w/s scheme, Hasnabad block under Hasnabad Sub-Division, P.H.E. Dte. ORD/000529/2024-2025 2896/BD 03/10/2024 240 M/S SUKANTA ENTERPRISE. 51.37 0.00 0
507 Barasat Division Acceptance cum work order for Restoration of RCC drain from Near Julfikar Molla shop to N/H/O Sariful Molla for damaged portion due to laying of 150 mm dia DI Rising main of Kumarjole w/s scheme, Minakhan block under Hasnabad Sub-Division P.H.E. Dte. ORD/000530/2022-2023 1244/HSD 20/07/2022 21 JESMINE ENTERPRISE. 3.39 3.26 1
508 Barasat Division Acceptance cum work order for Restoration of RCC drain from N/H/O Sahidul Molla to near Julfikar Molla shop for damaged portion due to laying of 150 mm dia DI Rising main of Kumarjole w/s scheme, Minakhan block under Hasnabad Sub-Division P.H.E. Dte. ORD/000531/2022-2023 1246/HSD 20/07/2022 21 JESMINE ENTERPRISE. 4.76 4.42 1
509 Barasat Division Acceptance cum work order for Sinking of 2 nos. 300 mm. x 200 mm. dia. 360 mtr deep Tubewell by D.R. Rig method at PH No.-3 & 4 with PVC pipe & strainer having 300mm dia 48 mtr. long housing pipe & 200mm dia 30 mtr. long filter for Augmentation of Murarisha w/s scheme, Hasnabad block under Hasnabad Sub-Division, P.H.E. Dte. ORD/000531/2024-2025 2897/BD 03/10/2024 240 ACME CONSTRUCTION 51.76 0.00 50
510 Barasat Division Formal Work order for Providing Functional House Hold Tap Connection (FHTC) from existing and new proposed distribution system for Augmentation of Bira Rajibpur Water Supply Scheme within the jurisdiction of Habra Sub-Division under Barasat Division, P.H.E. Dte. ORD/000533/2022-2023 2447/BD 23/08/2022 1071 J.D.J.ENTERPRISE. (TRADERS PVT.LTD) 619.57 197.69 75
511 Barasat Division Formal Work order for Providing Functional House Hold Tap Connection (FHTC) from existing and new proposed distribution system for Augmentation of Maslandapur Water Supply Scheme (Zone - II) within the jurisdiction of Habra Sub-Division under Barasat Division, P.H.E. Dte. ORD/000534/2022-2023 2448/BD 23/08/2022 900 ALOK ENTERPRSE. (A UNIT OF SAKET TREXIM PVT.LTD) 526.45 381.78 1
512 Barasat Division Acceptance cum work order for Sinking of 1 nos. 300 mm. x 200 mm. dia. 360 mtr deep Tubewell by D.R. Rig method at PH No -I with PVC pipe & strainer having 300mm dia 48 mtr. long housing pipe & 200mm dia 30 mtr. long filter for Augmentation of Sahebkhali w/s scheme (Z-II), Hingalganj block under Hasnabad Sub-Division, P.H.E. Dte. ORD/000534/2024-2025 2900/BD 03/10/2024 30 SUBHAJIT SAHA 31.68 0.00 0
513 Barasat Division Acceptance cum work order for Additional Sinking of 2 nos. 300 mm. x 200 mm. dia. 360 mtr deep Tubewell by D.R. Rig method with PVC pipe & strainer having 300mm dia 48 mtr. long housing pipe & 200mm dia 30 mtr. long filter for Augmentation of Hingalganj w/s scheme (Z-I), Hingalganj block under Hasnabad Sub-Division, P.H.E. Dte. ORD/000536/2024-2025 2902/BD 03/10/2024 60 ANJALI ENTERPRISE. 51.76 0.00 0
514 Barasat Division Acceptance cum work order for Additional Sinking of 2 nos. 300 mm. x 200 mm. dia. 360 mtr deep Tubewell by D.R. Rig method with PVC pipe & strainer having 300mm dia 48 mtr. long housing pipe & 200mm dia 30 mtr. long filter for Augmentation of Hingalganj w/s scheme (Z-II), Hingalganj block under Hasnabad Sub-Division, P.H.E. Dte. ORD/000537/2024-2025 2903/BD 03/10/2024 60 M/S RAJPATH CONSTRUCTION. 51.59 0.00 0
515 Barasat Division Acceptance cum work order for Special Repair & Maintenance of Rising main & Distribution system (CI/DI/UPVC) for Hingalganj Mouza within Hingalganj w/s Scheme (Zone-I), Hingalganj block under Hasnabad Sub-Division, P.H.E. Dte. ORD/000539/2021-2022 1644/HSD 05/10/2021 15 MONDAL & CO. (BASIRHAT). 2.59 2.58 0
516 Barasat Division Acceptance cum work order for Special Repair & Maintenance of Rising main & Distribution system (CI/DI/UPVC) for Mamudpur Mouza within Hingalganj w/s Scheme (Zone-I), Hingalganj block under Hasnabad Sub-Division, P.H.E. Dte. ORD/000540/2021-2022 1645/HSD 05/10/2021 15 TRISHA ENTERPRISE & CO. 2.54 2.53 0
517 Barasat Division Acceptance cum work order for Sinking of 2 nos. 300 mm. x 200 mm. dia. 360 mtr deep Tubewell by D.R. Rig method at PH No.-3 & 4 with PVC pipe & strainer having 300mm dia 48 mtr. long housing pipe & 200mm dia 30 mtr. long filter for Augmentation of Bermajur w/s scheme, Sandeshkhali-II block under Hasnabad Sub-Division, P.H.E. Dte. ORD/000540/2024-2025 2929/BD 03/10/2024 80 TITUMIR INTERNATIONAL 51.66 11.65 100
518 Barasat Division Acceptance cum work order for OHR connection with distribution main including Laying of balance laying work of rising main and distribution pipe line within Hingalganj water supply scheme (Zone-I), Hingalganj Block under Hasnabad Sub-Division, P.H.E. Dte. ORD/000541/2021-2022 1646/HSD 05/10/2021 15 ANKUSH CONSTRUCTION & CO. 4.51 4.48 0
519 Barasat Division Formal work order for Laying of DI/UPVC distribution pipe line and providing Functional Household Tap Connection for Augmentation of Malancha water supply scheme (Z-II), Minakhan Block under Hasnabad Sub-Division, PHE Dte. under barasat Division, PHE Dte. ORD/000541/2022-2023 2449/BD 23/08/2022 90 MONDAL & CO. (BASIRHAT). 297.24 283.96 1
520 Barasat Division Acceptance cum work order for Construction of switch room cum chlorine room with sanitary & water supply arrangement i/c plinth protection at OHR site (Size-5.40x3.60 mtr.) & PH No-1 (Size-3.60x3.00 mtr.) for Kalitala w/s scheme (Z-I), Hingalganj Block under Ketarchak Piped Water Supply Scheme within Hasnabad Sub-Division, P.H.E. Dte. ORD/000541/2024-2025 2959/BD 04/10/2024 60 MD.SALIM GAZI. 21.30 0.00 0
521 Barasat Division Acceptance cum work order for Additional Land development at Pump House No.-1 (New site) within Sultanpur w/s scheme, Minakhan Block under Hasnabad Sub-Division P.H.E. Dte. ORD/000542/2021-2022 1647/HSD 05/10/2021 10 SRI KRISHNA CO-OP-LABOUR CONTRACT AND CONST SOC LTD. 1.14 1.14 0
522 Barasat Division Acceptance cum work order for Construction of Office cum Godown with sanitary & water supply arrangement i/c plinth protection at OHR site (Size-5.40x3.60 mtr.) for Augmentation of Rupamari w/s scheme (Z-I), Hingalganj Block under Hasnabad Sub-Division, PHE Dte. ORD/000542/2024-2025 2974/BD 04/10/2024 60 TALUKDER & CO. 13.56 0.00 0
523 Barasat Division Acceptance cum work order for Laying of 150 mm dia. DI rising main from Pump House No-2 to Pump House No.-1 (New site) within Sultanpur w/s scheme, Minakhan Block under Hasnabad Sub- Division P.H.E. Dte. ORD/000543/2021-2022 1648/HSD 05/10/2021 10 R.K.MANDAL AND CO. 1.20 1.18 0
524 Barasat Division Acceptance cum work order for Additional Functional Household Tap Connection (FHTC) in Paitkelpota & Paitkelpota Abad mouza including laying of UPVC/PVC pipe & supply of necessary fittings Sultanpur w/s scheme, Minakhan block under Hasnabad Sub-Division, PHE Dte. ORD/000544/2021-2022 1649/HSD 05/10/2021 15 MONDAL & CO. (BASIRHAT). 1.90 1.90 0
525 Barasat Division Formal Work order for Providing Functional House Hold Tap Connection (FHTC) from existing and new proposed distribution system for Augmentation of at Janaphul Water Supply Scheme within the jurisdiction of Habra Sub-Division under Barasat Division, P.H.E. Dte. ORD/000546/2022-2023 2461/BD 23/08/2022 90 UTPAL CONSTRUCTION & CO. 230.82 192.12 100
526 Barasat Division Acceptance cum work order for Additional Functional Household Tap Connection (FHTC) in Joykrisnapur mouza including laying of UPVC/PVC pipe & supply of necessary fittings Sultanpur w/s scheme, Minakhan block under Hasnabad Sub-Division, PHE Dte. ORD/000547/2021-2022 1652/HSD 05/10/2021 15 MONDAL & CO. (BASIRHAT). 3.04 3.04 0
527 Barasat Division Acceptance cum work order for Construction of Office cum Godown with sanitary & water supply arrangement i/c plinth protection at OHR site (Size-5.40x3.60 mtr.) for Augmentation of Rupamari w/s scheme (Z-II), Hingalganj Block under Hasnabad Sub-Division, PHE Dte. ORD/000547/2024-2025 3023/BD 22/10/2024 360 LAHIRI CONSTRUCTION. 13.58 0.00 50
528 Barasat Division Acceptance cum work order for Restoration of pipeline by withdrawn & relaying of different dia. UPVC pipe line for extra widening of PWD road from Ghoshpara More to Sri Chaitanya Math within Hingalganj W/S Scheme (Zone-I), Hingalganj block under Hasnasbad Sub-Division, P.H.E.Dte. ORD/000548/2021-2022 1653/HSD 05/10/2021 15 MONDAL & CO. (BASIRHAT). 4.61 4.60 0
529 Barasat Division Acceptance cum work order for Additional Construction of 2 nos. switch room cum chlorine room (Size-5.40x3.60 mtr.) for Augmentation of Hingalganj w/s scheme (Z-I), Hingalganj block under Hasnabad Sub-Division, P.H.E. Dte. ORD/000548/2024-2025 3025/BD 22/10/2024 90 M/S ANUBHAB CONSTRUCTION. 15.83 0.00 0
530 Barasat Division Acceptance cum work order for Restoration of pipeline by withdrawn & relaying of different dia. UPVC pipe line for extra widening of PWD road from Sri Chaitanya Math to Pather Dabi More within Hingalganj W/S Scheme (Zone-I), Hingalganj block under Hasnasbad Sub-Division, P.H.E.Dte. ORD/000549/2021-2022 1654/HSD 05/10/2021 15 MONDAL & CO. (BASIRHAT). 4.60 4.59 0
531 Barasat Division Acceptance cum work order for Additional Providing Functional Household Tap Connection (FHTC) in connection with Jal Jeevan Mission (JJM and Jal Swapna) under command area of Bouthakurani water supply scheme (For Bouthakurani & Tongtala Mouza) at Sandeshkhali-II block under Hasnabad Sub-Division within Barasat Division, PHE Dte. ORD/000550/2021-2022 1655/HSD 05/10/2021 15 M/S B.K.ENTERPRISE. 4.35 4.35 0
532 Barasat Division Acceptance cum work order for Geotechnical investigation for the construction of proposed OHR (Capacity 400 M3 ) at HW site within Nityaberia w/s scheme, Sandeshkhali-I block under Hasnabad Sub-Division, P.H.E. Dte. ORD/000550/2022-2023 1380/HSD 04/08/2022 30 RANJIT MITRA SUPPLIERS 0.73 0.73 0
533 Barasat Division Acceptance cum work order for Emergent restoration of road for damage portion at different places in connection with retrofitting of Boyermari within Mathbari Abad (Scheme code-SM/15825) w/s scheme, Sandeshkhali-I block under Hasnabad Sub-Division P.H.E. Dte. ORD/000550/2024-2025 992/HSD 29/08/2024 10 ANKUSH CONSTRUCTION & CO. 0.90 0.90 100
534 Barasat Division Preparation of geo-referenced GIS mapping with integrated software showing georeferenced location of Households, Piped water supply scheme and Distribution network to be incorporated into map by using both GIS & CAD software keeping the essential Technical aspect of 6 numbers scheme namely Gobindapur Dhokra, Rajnagar, Sadiknagar Zone-I, Bithari Zone-I, Bithari Zone-II and Simla Durgapur of North 24 Pgs. District under the jurisdiction of Basirhat Sub-Division. ORD/000551/2022-2023 945 / BHT SD 19/07/2022 15 M/S TECHVISION. 2.91 2.91 1
535 Barasat Division Acceptance cum work order for Temporary approach road for movement of winch machine and other allied machineries at Ph No- 2 within Malancha W/S scheme (Z-I), Minakhan block under Hasnabad Sub-Division P.H.E. Dte. ORD/000551/2024-2025 993/HSD 29/08/2024 10 M/S RAJPATH CONSTRUCTION. 0.87 0.00 100
536 Barasat Division Acceptance cum work order for Emergency repairing of existing FHTC along with pipe line in connection with retrofitting work at different places of Radhanagar mouza within Chotto Sehara w/s scheme, Sandeshkhali-I block under Hasnasbad Sub-Division, P.H.E.Dte. ORD/000552/2024-2025 994/HSD 29/08/2024 10 TRISHA ENTERPRISE & CO. 0.97 0.97 100
537 Barasat Division Acceptance cum work order for Additional Emergent restoration of concrete road for damage portion at different places due to newly laid HDPE/DI pipeline within Hasnabad w/s scheme, Hasnabad block under Hasnabad Sub-Division P.H.E. Dte. ORD/000553/2021-2022 1658/HSD 05/10/2021 10 SRI KRISHNA CO-OP-LABOUR CONTRACT AND CONST SOC LTD. 2.86 2.86 0
538 Barasat Division Acceptance cum work order for Emergent restoration of road for damage portion at different places in connection with retrofitting of Khas Sankardaha & Sankardaha Abad within Mathbari Abad (Scheme code-SM/15825) w/s scheme, Sandeshkhali-I block under Hasnabad Sub-Division P.H.E. Dte. ORD/000553/2024-2025 995/HSD 29/08/2024 10 ANKUSH CONSTRUCTION & CO. 0.93 0.93 100
539 Barasat Division Acceptance cum work order for Special Repair & Maintenance of Rising main & Distribution system (CI/DI/HDPE/UPVC) of Hasnabad w/s Scheme, Hasnabad block under Hasnabad Sub-Division, P.H.E. Dte. ORD/000554/2021-2022 1659/HSD 05/10/2021 21 MONDAL & CO. (BASIRHAT). 4.40 4.40 0
540 Barasat Division Acceptance cum work order for Supply and installation of 100mm dia sluice valve in distribution pipe line for smooth supply of water at different palces within within Mathbari Abad (Scheme code-SM/15825) water supply scheme, Sandeshkhali-I Block under Hasnabad Sub-Division, PHE Dte. ORD/000554/2024-2025 996/HSD 29/08/2024 10 ANKUSH CONSTRUCTION & CO. 0.91 0.00 100
541 Barasat Division Acceptance cum work order for Additional land development at tube well site-3 (CWR site) within Hingalganj w/s scheme (Zone-II), Hingalganj Block under Hasnabad Sub-Division P.H.E. Dte. ORD/000555/2021-2022 1660/HSD 05/10/2021 10 TRISHA ENTERPRISE & CO. 0.92 0.92 0
542 Barasat Division Acceptance cum work order for Supply and installation of 100mm dia sluice valve in distribution pipe line for smooth supply of water at different palces within Chotto Sehara water supply scheme, Sandeshkhali-I Block under Hasnabad Sub-Division, PHE Dte. ORD/000555/2024-2025 997/HSD 29/08/2024 10 TRISHA ENTERPRISE & CO. 0.84 0.84 100
543 Barasat Division Acceptance cum work order for Additional Functional Household Tap Connection (FHTC) in Khosbas & Singerkati mouza including laying of UPVC/PVC pipe & supply of necessary fittings within Hingalganj w/s scheme (Zone-II), Hingalganj block under Hasnabad Sub-Division, PHE Dte. ORD/000556/2021-2022 1661/HSD 05/10/2021 10 SRI KRISHNA CO-OP-LABOUR CONTRACT AND CONST SOC LTD. 1.20 1.20 0
544 Barasat Division Acceptance cum work order for Emergent resting of pipeline with bamboo pilling at different places at Khas Sankardaha & Sankardaha Abad within Mathbari Abad (Scheme code-SM/15825) w/s scheme, Sandeshkhali-I block under Hasnabad Sub- Division P.H.E. Dte. ORD/000556/2024-2025 998/HSD 29/08/2024 10 ANKUSH CONSTRUCTION & CO. 0.97 0.97 100
545 Barasat Division Acceptance cum work order for Supply and installation of 150mm dia sluice valve in distribution pipe line for smooth supply of water at different palces within Chotto Sehara water supply scheme, Sandeshkhali-I Block under Hasnabad Sub-Division, PHE Dte. ORD/000557/2024-2025 999/HSD 29/08/2024 10 TRISHA ENTERPRISE & CO. 0.97 0.97 100
546 Barasat Division Acceptance cum work order for Supply of different dia. Sluice Valve & construction of different dia. Sluice Valve chamber at different places within Hingalganj w/s scheme (Zone-I), Hingalganj Block under Hasnabad Sub- Division P.H.E. Dte. ORD/000558/2021-2022 1663/HSD 05/10/2021 10 MONDAL & CO. (BASIRHAT). 4.88 4.88 0
547 Barasat Division Acceptance cum work order for Supply and installation of 200 mm dia sluice valve in distribution pipe line for smooth supply of water at different palces within Mathbari Abad (Scheme code-SM/15825) water supply scheme, Sandeshkhali-I Block under Hasnabad Sub-Division, PHE Dte. ORD/000558/2024-2025 1000/HSD 29/08/2024 10 ANKUSH CONSTRUCTION & CO. 0.79 0.00 100
548 Barasat Division Formal work order for Providing Functional House Hold Tap Connection (FHTC) from existing and new proposed distribution system for Augmentation of at Gaighata Water Supply Scheme within the jurisdiction of Habra Sub-Division under Barasat Division, P.H.E. Dte. ORD/000559/2022-2023 2533/BD 29/08/2022 990 SUPRITI ENTERPRISE. 482.07 404.30 90
549 Barasat Division Acceptance cum work order for Supply and installation of 200mm dia sluice valve in distribution pipe line for smooth supply of water at different palces within Chotto Sehara water supply scheme, Sandeshkhali-I Block under Hasnabad Sub-Division, PHE Dte. ORD/000559/2024-2025 1001/HSD 29/08/2024 10 TRISHA ENTERPRISE & CO. 0.97 0.97 100
550 Barasat Division Acceptance cum work order for Additional Functional Household Tap Connection (FHTC) in Radhanagar mouza including laying of UPVC/PVC pipe & supply of necessary fittings within Chotto Sehara w/s scheme Sandeshkhali-I block under Hasnabad Sub-Division, PHE Dte. ORD/000560/2021-2022 1665/HSD 05/10/2021 10 TRISHA ENTERPRISE & CO. 3.56 3.56 0
551 Barasat Division Formal work order for Providing Functional House Hold Tap Connection (FHTC) from existing and new proposed distribution system for Augmentation of Bergum Water Supply Scheme within the jurisdiction of Habra Sub-Division under Barasat Division, P.H.E. Dte. ORD/000560/2022-2023 2534/BD 29/08/2022 90 UMWELT ENGINEER PVT.LTD. 654.34 638.03 1
552 Barasat Division Formal work order for Providing Functional House Hold Tap Connection (FHTC) from existing and new proposed distribution system for Augmentation of Kankpul Water Supply Scheme within the jurisdiction of Habra Sub-Division under Barasat Division, P.H.E. Dte. ORD/000562/2022-2023 2678/BD 08/09/2022 90 EFFLUENT & WATERTREATMENT ENGINEERS (P) LTD. 328.95 288.55 1
553 Barasat Division Acceptance cum work order for Providing Functional Household Tap Connection(FHTC) from existing and new proposed distribution system within the command area of Joypur Gopmahal Water Supply Scheme at Basirhat - II Block under Barasat Division, PHE Dte. (Phase II) ORD/000563/2021-2022 1951/BD 08/10/2021 15 SHIBU BISWAS. 21.73 20.05 1
554 Barasat Division Formal work order for Construction of 550cum capacity 20Mtr staging Height R.C.C. Over Head Reservoir and laying of Rising main & distribution pipe line by DI & UPVC and providing FHTC for Augmentation of Swetpur Zone-I Water Supply Scheme under Barasat Sub-Division, P.H.E.Dte. ORD/000563/2023-2024 2382/BD 10/08/2023 732 M/S BISWAS BROTHERS. 461.40 156.39 55
555 Barasat Division Acceptance cum work order for Emergent resting of pipeline with UC Bullah pilling at different places at Boyermari within Mathbari Abad w/s scheme (Scheme code-SM/15825) w/s scheme, Sandeshkhali-I block under Hasnabad Sub- Division P.H.E. Dte. ORD/000563/2024-2025 1003/HSD 29/08/2024 10 ANKUSH CONSTRUCTION & CO. 0.99 0.99 100
556 Barasat Division Acceptance cum work order for Providing Functional Household Tap Connection(FHTC) from existing and new proposed distribution system within the command area of Sadiknagar Zone-II Water Supply Scheme at Basirhat - II Block under Barasat Division, PHE Dte. (Phase II) ORD/000564/2021-2022 1952/BD 08/10/2021 30 SUDHAMAY MAJUMDAR. 58.36 53.39 1
557 Barasat Division Formal work order for Construction of 450 cum capacity 20 Mtr. staging height RCC Over Head Reservoir and laying of Rising main & distribution pipe line by DI & UPVC and providing FHTC for augmentation of Berachampa Zone-II Water Supply Scheme under Barasat Sub Division, P.H.E. Dte. ORD/000564/2023-2024 2447/BD 16/08/2023 959 H.I.ENTERPRISE. 556.61 346.11 78
558 Barasat Division Acceptance cum work order for Temporary approach road for movement of winch machine and other allied machineries at Head Work site within Petua Dhanihati W/S scheme, Sandeshkhali-I block under Hasnabad Sub-Division P.H.E. Dte. ORD/000564/2024-2025 1004/HSd 29/08/2024 10 S.K.ENTERPRISE. 0.90 0.00 100
559 Barasat Division Formal work order for Construction of 450 cum capacity 20 Mtr. staging height RCC Over Head Reservoir and laying of Rising main & distribution pipe line by DI & UPVC and providing FHTC for augmentation of Berachampa Zone-III Water Supply Scheme under Barasat Sub Division, P.H.E. Dte. ORD/000565/2023-2024 2449/BD 16/08/2023 959 H.I.ENTERPRISE. 621.51 370.32 75
560 Barasat Division Acceptance cum work order for Construction of anchor block for resting of 100 mm dia DI pipeline at different places in connection with Augmentation of Kalitala w/s scheme (Z-I), Hingalganj block under Hasnabad Sub-Division P.H.E. Dte. ORD/000565/2024-2025 1005/HSD 29/08/2024 10 ABDUL ALIM MONDAL. 0.99 0.00 100
561 Barasat Division Acceptance cum work order for Providing Functional Household Tap Connection(FHTC) from existing and new proposed distribution system within the command area of Kulia Piped water Supply Scheme at Baduria Block under Barasat Division, PHE Dte. (Phase II) ORD/000566/2021-2022 1953/BD 08/10/2021 15 B.S.ENTERPRISE. (BASIRHAT) 21.69 21.27 1
562 Barasat Division Acceptance cum work order for Emergent resting of pipeline with UC Bullah pilling at different places at Khas Sankardaha & Sankardaha Abad within Mathbari Abad w/s scheme (Scheme code-SM/15825), Sandeshkhali-I block under Hasnabad Sub- Division P.H.E. Dte. ORD/000566/2024-2025 1006/HSD 29/08/2024 10 ANKUSH CONSTRUCTION & CO. 0.99 0.99 100
563 Barasat Division Construction of Latrine at Head Work site and Renovation of P/H No-1 for Chikanpara Water Supply Scheme within the jurisdiction of Bongaon Sub-Division under Barasat Division, P.H.E. Dte. ORD/000566/2025-2026 638/Bon 21/05/2025 45 MA CONSTRUCTION. 4.31 0.00 0
564 Barasat Division Acceptance cum work order for Providing Functional Household Tap Connection(FHTC) from existing and new proposed distribution system within the command area of Dobila Piped Water Supply Scheme at Swarupnagar Block under Barasat Division, PHE Dte. (Phase II) ORD/000567/2021-2022 1954/BD 08/10/2021 15 M/S SUKANTA ENTERPRISE. 14.73 13.84 1
565 Barasat Division Acceptance cum work order for Construction of anchor block for resting of 200 mm dia DI pipeline at different places from N/H/O Narayan Biswas to Naskar para culvert in connection with Augmentation of Kalitala w/s scheme (Z-I), Hingalganj block under Hasnabad Sub-Division P.H.E. Dte. ORD/000567/2024-2025 1007/HSD 29/08/2024 10 ABDUL ALIM MONDAL. 0.99 0.52 100
566 Barasat Division Acceptance cum work order for Providing Functional Household Tap Connection(FHTC) from existing and new proposed distribution system within the command area of Dakshin Bagundi piped Water Supply Scheme at Basirhat -I Block under Barasat Division, PHE Dte. (Phase II) ORD/000568/2021-2022 1955/BD 08/10/2021 15 DEY & CO. 16.50 14.77 1
567 Barasat Division Construction of Boundary wall at 2nd T/W site for Augmentation of Bharatpur Water Supply Scheme within the jurisdiction of Bongaon Sub-Division under Barasat Division, P.H.E. Dte. ORD/000568/2023-2024 613/Bon 08/08/2023 21 ONKAR ENTERPRISE. 4.08 0.00 0
568 Barasat Division Acceptance cum work order for Construction of Boundary Wall at Matiagacha Water Supply Scheme under Barasat-II Block, under Barasat Sub-Division, P.H.E.Dte. ORD/000568/2024-2025 3080/BD 29/10/2024 30 SANTU GHOSH. 25.10 0.00 0
569 Barasat Division Acceptance cum work order for Providing Functional Household Tap Connection(FHTC) from existing and new proposed distribution system within the command area of Akipur Water Supply Scheme at Basirhat - II Block under Barasat Division, PHE Dte. (Phase II) ORD/000569/2021-2022 1956/BD 08/10/2021 30 BANERJEE CONSTRUCTION. 58.26 53.25 1
570 Barasat Division Renovation and repairing of Boundary wall at 2nd T/W site for Augmentation of Panchita Water Supply Scheme within the jurisdiction of Bongaon Sub-Division under Barasat Division, P.H.E. Dte. ORD/000569/2023-2024 615/Bon 08/08/2023 21 PRABIR KUMAR MONDAL. 4.15 4.11 100
571 Barasat Division Acceptance cum work order for Construction of Boundary Wall at Deara Water Supply Scheme under Barasat-II Block, under Barasat Sub-Division, P.H.E.Dte. ORD/000569/2024-2025 3081/BD 29/10/2024 30 M/S SANJAY ADHIKARI 32.14 0.00 0
572 Barasat Division Renovation and repairing of Boundary wall at 2nd T/W site for Augmentation of Sindrani (Zone-I) Water Supply Scheme within the jurisdiction of Bongaon Sub-Division under Barasat Division, P.H.E. Dte. ORD/000570/2023-2024 616/Bon 08/08/2023 21 VAI ENTERPRISE. 1.86 1.83 100
573 Barasat Division Acceptance cum work order for Construction of Boundary wall, Approach Road and Land development at Head Work site of Garibpur Water Supply Scheme, Bongaon Block within the jurisdiction of Bongaon Sub-Division under Barasat Division, P.H.E. Dte. ORD/000572/2024-2025 3157/BD 14/11/2024 30 AMIT KUMAR BOSE. 34.19 0.00 0
574 Barasat Division Formal Work Order for Providing Functional Household Tap Connection(FHTC) from existing and new proposed distribution system within the command area of Bara Bankra Water Supply Scheme at Swarupnagar Block under Barasat Division, PHE.(Phase-I). ORD/000573/2021-2022 1974/BD 26/10/2021 90 PUSPA ENTERPRISE. 192.09 179.40 1
575 Barasat Division Acceptance cum work order for Temporary approach road for movement of winch machine and other allied machineries at Head Work site within Kanmari W/S scheme (Z-I), Sandeshkhali-I block under Hasnabad Sub-Division P.H.E. Dte. ORD/000573/2024-2025 1117/HSD 19/09/2024 10 TRISHA ENTERPRISE & CO. 0.90 0.90 100
576 Barasat Division Fomal work order for Providing Functional Household Tap Connection (FHTC) in connection with Jal Jeevan Mission (JJM and JAL SWAPNA) under command area of Kshudra Mangalgathi, Mirzzapur, Swetpur, Daibagnapol, Mongal Nagar, Noajispur, Bajitnagar, Mobarakpur & Bara Bisweswarpur mouzas (Part) within Sohai Swetpur Zone-I Water Supply Scheme at Deganga Block under Barasat Division, PHE Dte. Part-A Phase-I ORD/000574/2021-2022 1975/BD 26/10/2021 90 H.I.ENTERPRISE. 225.34 210.13 1
577 Barasat Division Emergency laying of wash out pipe line and others allied works from Kola Pump House No-I to nearest Baor at Adibasi Para at Kola water supply scheme under Bongaon Sub-Division, P.H.E.Dte. ORD/000575/2022-2023 383/Bon 05/08/2022 12 ACHINTA KUMAR HALDER. 1.10 1.08 1
578 Barasat Division Acceptance cum work order for Temporary approach road for movement of winch machine and other allied machineries at Head Work site within Padmapukuria W/S scheme (Z-I), Minakhan block under Hasnabad Sub-Division P.H.E. Dte. ORD/000579/2024-2025 1141/HSD 24/09/2024 10 TRISHA ENTERPRISE & CO. 0.87 0.87 100
579 Barasat Division Acceptance cum work order for Temporary approach road for movement of winch machine and other allied machineries at Head Work site within Padmapukuria W/S scheme (Z-II), Minakhan block under Hasnabad Sub-Division P.H.E. Dte. ORD/000581/2024-2025 1143/HSD 24/09/2024 10 M/S R.B.S.ENTERPRISE. 0.87 0.00 100
580 Barasat Division Acceptance cum work order for Temporary approach road for movement of winch machine and other allied machineries at Head Work site within Boyermari Abad W/S scheme, Sandeshkhali-I block under Hasnabad Sub-Division P.H.E. Dte. ORD/000582/2024-2025 1179/HSD 30/09/2024 10 M/S DATTA ENTERPRISE. 0.89 0.00 100
581 Barasat Division Acceptance cum work order for Supply and installation of 250 mm dia sluice valve in distribution pipe line for smooth supply of water at different palces within Mathbari Abad (Scheme code-SM/15825) water supply scheme, Sandeshkhali-I Block under Hasnabad Sub-Division, PHE Dte. ORD/000583/2024-2025 1160/HSD 25/09/2024 10 ANKUSH CONSTRUCTION & CO. 0.83 0.00 100
582 Barasat Division Acceptance cum work order for Protection of UPVC rising main by UC bullah pile at Joygram Fisheries for Rejuvenation of Kumarjole w/s scheme, Minakhan block under Hasnabad Sub-Division P.H.E. Dte. ORD/000585/2021-2022 1851/HSD 17/11/2021 15 ABDUL ALIM MONDAL. 3.36 3.34 1
583 Barasat Division Acceptance cum work order for Supply and installation of 150 mm dia sluice valve in distribution pipe line for smooth supply of water at different palces within Mathbari Abad (Scheme code-SM/15825) water supply scheme, Sandeshkhali-I Block under Hasnabad Sub-Division, PHE Dte. ORD/000585/2024-2025 1171/HSD 26/09/2024 10 ANKUSH CONSTRUCTION & CO. 0.79 0.00 100
584 Barasat Division Laying of distribution pipe line for smoothly water supply all over back site villagers and other allied works at Koniara water supply scheme under Bongaon Sub-Division P.H.E.Dte. ORD/000587/2022-2023 404/Bon 23/08/2022 15 ROY CHOWDHURY CONSTRUCTION. 3.49 3.47 1
585 Barasat Division Acceptance cum work order for Emergency repairing of existing FHTC along with pipe line in connection with retrofitting work at different places of Chotto Sehara mouza within Chotto Sehara w/s scheme, Sandeshkhali-I block under Hasnasbad Sub-Division, P.H.E.Dte. ORD/000587/2024-2025 1172/HSD 26/09/2024 10 TRISHA ENTERPRISE & CO. 0.97 0.97 100
586 Barasat Division Acceptance cum work order for Construction of Boundary Wall for Pump House No - 2 of Talsa & Adj Mouzas water Supply Scheme in connection with Augmentation work under JJM project with in the jurisdiction of Habra Sub-Division under Barasat Division P.H.E.Dte. ORD/000588/2024-2025 3065/BD 25/10/2024 40 PUSPA CONSTRUCTION. 5.62 0.00 0
587 Barasat Division Acceptance cum work order for Providing Functional Household Tap Connection (FHTC) in connection with Jal Jeevan Mission (JJM and JAL SWAPNA) under command area of Banspol, Dariala & Birpur mouzas within Humaipur Water Supply Scheme at Barasat-II Block under Barasat Sub Division, PHE Dte. ORD/000591/2022-2023 2626/BD 05/09/2022 30 M/S K.B.ENTERPRISE. 43.06 38.98 1
588 Barasat Division Acceptance cum work order for Emergent resting of pipeline with bamboo pilling at different places at Boyermari within Mathbari Abad (Scheme code-SM/15825) w/s scheme, Sandeshkhali-I block under Hasnabad Sub- Division P.H.E. Dte. ORD/000591/2024-2025 1178/HSD 30/09/2024 10 ANKUSH CONSTRUCTION & CO. 0.99 0.00 100
589 Barasat Division Acceptance cum work order for Providing Functional Household Tap Connection (FHTC) in connection with Jal Jeevan Mission (JJM and JAL SWAPNA) under command area of SADPUR Water Supply Scheme at Habra - I Block within the jurisdiction of Habra Sub-Division, under Barasat Division, P.H.E. Dte. (Phase - I) ORD/000592/2022-2023 2627/BD 05/09/2022 660 M/S SUKANTA ENTERPRISE. 48.49 26.76 100
590 Barasat Division Acceptance cum work order for Repairing of Boundary Wall for PH-1 of Khasdelpur Water Supply Scheme in connection with Augmentation work under JJM project within the jurisdiction of Habra Sub-Division under Barasat Division, PHE Dte. ORD/000592/2024-2025 3063/BD 25/10/2024 30 ANJALI CONSTRUCTION. 5.08 0.00 0
591 Barasat Division Acceptance cum Work Order for Hiring of 1(one) number vehicle of category Motor Cab/Maruti Omni(standard)(Non Air-conditioned) with Diesel/LPG/CNG Engine)[not more than 5 (five) years old] including Driver for performing the inspection works and official duties for the office of the Assistant Engineer, Barrackpore Sub-Division, P.H.E. Dte. at Barrackpore, Kolkata-700122, district- North 24Pgns, W.B. ORD/000594/2022-2023 158/BKP 29/07/2022 365 GOPAL SINGHA. 1.73 3.93 1
592 Barasat Division Formal work order for Laying of DI rising main, DI/UPVC distribution pipe line and providing Functional Household Tap Connection for Augmentation of Fakirtakia water supply scheme, Sandeshkhali-I Block within Hasnabad Sub-Division, under Barasat Division, PHE Dte. ORD/000596/2022-2023 2674/BD 08/09/2022 90 PROJECT INDIA 228.86 223.88 1
593 Barasat Division Construction of Boundary Wall 30 m Length for Pump House No - 2 of Khosdelpur water Supply Scheme in connection with Augmentation work under JJM project within the jurisdiction Habra Sub-Division under Barasat Division P.H.E.Dte. ORD/000596/2024-2025 912/HAB 30/10/2024 40 M/S SUKANTA ENTERPRISE. 4.83 0.00 0
594 Barasat Division Formal work order for Laying of UPVC distribution pipe line and providing Functional Household Tap Connection for Augmentation of Kumarjole water supply scheme, Minakhan Block within Hasnabad Sub-Division, under Barasat Division, PHE Dte. ORD/000597/2022-2023 2676/BD 08/09/2022 90 JAL PRAVAHIKA PVT. LTD. 260.00 259.94 1
595 Barasat Division Continuation work order for Hiring 1(one) no. Diesel Luxary Car on daily basis (for 01.09.2022 to 31.12.2022) for office use of the Assistant Engineer, R.W.S Barasat Sub-Division, P.H.E. Dte. ORD/000598/2022-2023 641/BST 31/08/2022 122 DEBAPRASAD MONDAL. 0.58 0.93 1
596 Barasat Division Construction of Service Road 50 Mtr. Length and 2 Mtr. Width for Pump House No1 of Sadpur Water Supply Scheme in connection with Augmentation work under JJM project within the jurisdiction of Habra Sub-Division under Barasat Division, PHE Dte. ORD/000600/2024-2025 783/HAB 20/08/2024 10 JOY ENTERPRISE 2.95 2.92 100
597 Barasat Division Hiring 1(one) no. Diesel Luxary Car on daily basis (for 01.09.2021 to 31.08.2022) for office use of the Assistant Engineer, R.W.S, Barasat Sub- Division, P.H.E. Dte. ORD/000601/2021-2022 447/BST 25/08/2021 365 DEBAPRASAD MONDAL. 1.72 1.31 1
598 Barasat Division Formal work order for Laying of DI rising main, DI/UPVC distribution pipe line and providing Functional Household Tap Connection for Augmentation of Korakati water supply scheme, Sandeshkhali-II Block within Hasnabad Sub-Division, under Barasat Division, PHE Dte. ORD/000602/2022-2023 2675/BD 08/09/2022 90 PATHIK PABAN NANDI 274.10 265.59 1
599 Barasat Division Special repair and renovation of pump house and other Allied Works for Pump House No - 2 of Khosdelpur and Adj. Mouzas W/S scheme in connection with Augmentation work under JJM project within the jurisdiction of Habra Sub-Division under Barasat Division, P.H.E. Dte. ORD/000602/2024-2025 915/HAB 30/10/2024 20 M/S SUKANTA ENTERPRISE. 2.60 0.00 0
600 Barasat Division Preparation of DPR in connection of augumentation of Joypul Water Supply Scheme under Barasat Sub Division, P.H.E. Dte. Sl. No.-01 ORD/000603/2022-2023 656/BSD 18/08/2022 30 RADIANT 3.73 3.04 100
601 Barasat Division construction of the Service Road 35.00 Mtr. Length and 3.00 Mtr. Wide while 1.00 Mtr. wide road already existing in Head Work Site of Maslandapur- II Piped Water Supply Scheme in connection with Augmentation work under JJM project within the jurisdiction of Habra Sub-Division under Barasat Division, PHE Dte. ORD/000603/2024-2025 916/HAB 30/10/2024 10 M/S GUHA CONSTRUCTION. 2.26 0.00 0
602 Barasat Division Preparation of DPR in connection of augumentation of Bamangachhi Water Supply Scheme under Barasat Sub Division, P.H.E. Dte. Sl. No.-02 ORD/000604/2022-2023 657/BSD 18/08/2022 30 RADIANT 3.00 2.72 100
603 Barasat Division Construction of Service Road 45 Mtr. Length X 2 Mtr. Width for Pump House No 1 of Gaighata Water Supply Scheme in connection with Augmentation work under JJM project within the jurisdiction of Habra Sub-Division under Barasat Division, PHE Dte. ORD/000604/2024-2025 917/HAB 30/10/2024 10 M/S DAS & CO. 2.75 0.00 0
604 Barasat Division Detail route survey, design of distribution network and preparation of estimate, drawing & DPR for providing FHTC in the scheme of Berachampa Water Supply Scheme Zone-I under Barasat Sub Division, P.H.E. Dte. ORD/000605/2022-2023 658/BSD 18/08/2022 30 SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. 3.86 3.86 1
605 Barasat Division Construction of Service Road 17 Mtr. Length X 2 Mtr. Width for Pump House No 2 of Gaighata Water Supply Scheme in connection with Augmentation work under JJM project within the jurisdiction of Habra Sub-Division under Barasat Division, PHE Dte. ORD/000605/2024-2025 919/HAB 30/10/2024 10 DEBANJAN GHOSH. 1.04 0.00 0
606 Barasat Division Detail route survey, design of distribution network and preparation of estimate, drawing & DPR for providing FHTC in the scheme of Berachampa Water Supply Scheme Zone-II under Barasat Sub Division, P.H.E. Dte. ORD/000606/2022-2023 659/BSD 18/08/2022 30 SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. 3.61 3.58 1
607 Barasat Division Construction of Service Road 40 Mtr. Length X 2 Mtr. Width for Pump House No 1 of Talsa and Adj Mouzas Water Supply Scheme in connection with Augmentation work under JJM project within the jurisdiction of Habra Sub-Division under Barasat Division, PHE Dte. ORD/000606/2024-2025 920/HAB 30/10/2024 10 TALUKDER & CO. 2.44 0.00 0
608 Barasat Division Preparation of DPR in connection of augumentation of Kashimpur Water Supply Scheme under Barasat Sub Division, P.H.E. Dte. ORD/000607/2022-2023 666/BSD 25/08/2022 30 RADIANT 3.04 2.88 100
609 Barasat Division Special repair and renovation of pump house and other Allied Works for Pump House No - 1 of Gaighata WS scheme in connection with Augmentation work under JJM project within the jurisdiction of Habra Sub-Division under Barasat Division, P.H.E. Dte. ORD/000607/2024-2025 921/HAB 30/10/2024 20 DEBASISH SARKAR. 2.65 0.00 0
610 Barasat Division Preparation of DPR in connection of augumentation of Shibalaya Water Supply Scheme under Barasat Sub Division, P.H.E. Dte. ORD/000608/2022-2023 667/BSD 25/08/2022 30 RADIANT 3.07 2.79 100
611 Barasat Division Special repair and renovation of pump house and other Allied Works for Pump House No - 1 of Kamarpur WS scheme in connection with Augmentation work under JJM project within the jurisdiction of Habra Sub-Division under Barasat Division, P.H.E. Dte. ORD/000608/2024-2025 922/HAB 30/10/2024 20 M/S LATIKA CONSTRUCTION. 2.66 0.00 0
612 Barasat Division Detail route survey, design of distribution network and preparation of estimate, drawing & DPR for providing FHTC in the scheme of Berachampa Water Supply Scheme Zone-III under Barasat Sub Division, P.H.E. Dte. ORD/000609/2022-2023 668/BSD 25/08/2022 30 SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. 3.73 3.73 1
613 Barasat Division Detail route survey, design of distribution network and preparation of estimate, drawing & DPR for providing FHTC in the scheme of Berachampa Water Supply Scheme Zone-IV under Barasat Sub Division, P.H.E. Dte. ORD/000610/2022-2023 671/BSD 29/08/2022 30 SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. 3.95 3.95 1
614 Barasat Division Construction of Latrine at Head Work site for Augmentation of Helencha Water Supply Scheme within the jurisdiction of Bongaon Sub-Division under Barasat Division, P.H.E. Dte. ORD/000610/2025-2026 640/Bon 21/05/2025 45 KAMAL HALDER. 2.40 0.00 0
615 Barasat Division Preparation of DPR in connection of augumentation of Sohai Swetpur Water Supply Scheme Zone-I under Barasat Sub Division, P.H.E. Dte. ORD/000611/2022-2023 672/BSD 30/08/2022 30 RADIANT 3.28 3.01 100
616 Barasat Division Construction of Latrine at 2nd Pump House site and Renovation of PH No - 1 & 2 for Ichhapur Water Supply Scheme within the jurisdiction of Bongaon Sub-Division under Barasat Division, P.H.E. Dte. ORD/000611/2025-2026 653/Bon 22/05/2025 45 ROY ENGINEERS. 3.30 0.00 0
617 Barasat Division Detail route survey, design of distribution network and preparation of estimate, drawing & DPR for providing FHTC in the scheme of Berachampa Water Supply Scheme Zone-V under Barasat Sub Division, P.H.E. Dte. ORD/000612/2022-2023 673/BSD 31/08/2022 30 SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. 3.61 3.61 1
618 Barasat Division Construction of Latrine at Head Work site and Renovation of PH No - 1 & 2 and allied works for Augmentation of Kurulia (Zone-I) Water Supply Scheme within the jurisdiction of Bongaon Sub-Division under Barasat Division, P.H.E. Dte. ORD/000612/2025-2026 662/Bon 23/05/2025 45 M/S SAYAN ENTERPRISE. 3.51 0.00 0
619 Barasat Division Construction of Latrine at Head Work site for Augmentation of Kurulia (Zone II) Water Supply Scheme within the jurisdiction of Bongaon Sub-Division under Barasat Division, P.H.E. Dte. ORD/000615/2025-2026 670/Bon 26/05/2025 45 SAMBHU RAY CHOWDHURY. 1.76 0.00 0
620 Barasat Division Construction of Latrine at Head Work site for Augmentation of Shimulpur Water Supply Scheme within the jurisdiction of Bongaon Sub-Division under Barasat Division, P.H.E. Dte. ORD/000616/2025-2026 672/Bon 26/05/2025 45 A.D.ENTERPRISE. 1.75 0.00 0
621 Barasat Division Construction of 3.60 mtr. X 3.00mtr. size Guard room with sanitary and water supply arrangement incl. plinth protection at Head Work site at Krishnachandrapur w/s scheme, Bongaon block within the jurisdiction of Bongaon Sub-Division, under Barasat Division, P.H.E. Dte. ORD/000617/2025-2026 678/Bon 27/05/2025 45 M/S S.HAQUE & CO. 4.46 0.00 0
622 Barasat Division Formal work order for Providing Functional House Hold Tap Connection (FHTC) from existing and new proposed distribution system for Augmentation of Maslandapur Water Supply Scheme (Zone - I) within the jurisdiction of Habra Sub-Division under Barasat Division, P.H.E. Dte. ORD/000618/2022-2023 2720/BD 14/09/2022 90 UMWELT ENGINEER PVT.LTD. 512.52 480.61 1
623 Barasat Division Acceptance cum work order for Protection of newly laid different dia UPVC/DI pipeline by UC bullah pile at N/H/O Sankar Pradhan, Uttam Das at Pradhan para & N/H/O Asraf Molla at Gazi para in connection with retrofitting of Chunchura w/s scheme, Sandeshkhali-I block under Hasnabad Sub- Division P.H.E. Dte. ORD/000620/2022-2023 1325/HSD 02/08/2022 10 SRI KRISHNA CO-OP-LABOUR CONTRACT AND CONST SOC LTD. 4.82 4.81 1
624 Barasat Division Repairing & Renovation of Head Work Pump House site and allied works at Helencha water supply scheme under Bongaon Sub-Division, P.H.E.Dte. ORD/000624/2022-2023 409/Bon 23/08/2022 12 KAMAL HALDAR. 3.00 2.96 1
625 Barasat Division Laying of badly damaged distribution pipe line and others allied for widening Panchayet Road from Chhaygharia Ajay Mondal's House to Khedapara F.P School to Trimonipara at Chhaygharia (Zone-II) water supply scheme under Bongaon Sub-Division, P.H.E.Dte. ORD/000626/2022-2023 411/Bon 23/08/2022 15 PRABIR KUMAR MONDAL. 4.55 3.39 1
626 Barasat Division Formal Work Order for Providing Functional Household Tap Connection (FHTC) in connection with Jal Jeevan Mission (JJM and JAL SWAPNA) under command area of Dangatangatangi, Bodai, Sonadanga, Kamdebpur, Mirhati, Mathura, Durlavpur & Belu mouzas (Part) within Bodai Zone-I Water Supply Scheme at Amdanga Block under Barasat Division, PHE Dte. Part-A Phase-I ORD/000630/2021-2022 2145/BD 12/11/2021 90 UMWELT ENGINEER PVT.LTD. 222.53 201.49 1
627 Barasat Division Construction of Approach Road Head Work at site for Augmentation of Panchita Water Supply Scheme within the jurisdiction of Bongaon Sub-Division under Barasat Division, P.H.E. Dte. ORD/000634/2023-2024 617/Bon 08/08/2023 17 KAMAL HALDER. 2.94 2.93 100
628 Barasat Division Construction of Approach Road Head Work at site for Augmentation of Sindrani (Zone-I) Water Supply Scheme within the jurisdiction of Bongaon Sub-Division under Barasat Division, P.H.E. Dte. ORD/000635/2023-2024 618/Bon 08/08/2023 25 ROY ENGINEERS. 4.51 4.51 100
629 Barasat Division Construction of Approach Road Head Work at site for Augmentation of Gangrapota Water Supply Scheme within the jurisdiction of Bongaon Sub-Division under Barasat Division, P.H.E. Dte. ORD/000636/2023-2024 619/BON 08/08/2023 20 MA CONSTRUCTION. 3.98 3.95 100
630 Barasat Division Construction of Approach Road Head Work at site for Augmentation of Kurulia (Zone-I) Water Supply Scheme within the jurisdiction of Bongaon Sub-Division under Barasat Division, P.H.E. Dte. ORD/000637/2023-2024 620/Bon 08/08/2023 15 ONKAR ENTERPRISE. 2.40 2.35 100
631 Barasat Division Construction of Approach Road Head Work at site for Augmentation of Bharatpur Water Supply Scheme within the jurisdiction of Bongaon Sub-Division under Barasat Division, P.H.E. Dte. ORD/000639/2023-2024 622/Bon 08/08/2023 12 SAMBHU RAY CHOWDHURY. 1.51 1.47 100
632 Barasat Division Construction of Approach Road Head Work at site for Augmentation of Krishnacandrapur Water Supply Scheme within the jurisdiction of Bongaon Sub-Division under Barasat Division, P.H.E. Dte. ORD/000640/2023-2024 623/Bon 08/08/2023 25 ROY CHOWDHURY CONSTRUCTION. 4.73 4.72 100
633 Barasat Division Construction of Approach Road Head Work at site for Augmentation of Bagdah Water Supply Scheme within the jurisdiction of Bongaon Sub-Division under Barasat Division, P.H.E. Dte. ORD/000641/2023-2024 624/Bon 08/08/2023 15 TAPAN GHOSH. 2.39 2.38 100
634 Barasat Division Formal Work Order for Providing Functional Household Tap Connection (FHTC) in connection with Jal Jeevan Mission (JJM and Jal Swapna) under command area of Gaighata Water Supply Scheme at Gaighata Block within the jurisdiction of Habra Sub-Division under Barasat Division, PHE Dte. (Phase-I). ORD/000642/2021-2022 2174/BD 18/11/2021 90 SINGHA ROY & CO. 133.93 129.03 1
635 Barasat Division Renovation and repairing of Boundary wall at 2nd T/W site for Augmentation of Kurulia (Zone-I) Water Supply Scheme within the jurisdiction of Bongaon Sub-Division under Barasat Division, P.H.E. Dte. ORD/000642/2023-2024 612/Bon 08/08/2023 21 ROY CHOWDHURY CONSTRUCTION. 2.76 2.72 100
636 Barasat Division Formal Work Order for Providing Functional Household Tap Connection (FHTC) in connection with Jal Jeevan Mission (JJM and Jal Swapna) under command area of Gangrapota Water Supply Scheme at Bongaon Block under Barasat Division, PHE Dte. (Phase-I). ORD/000643/2021-2022 2175/BD 18/11/2021 90 AMIT KUMAR BOSE. 167.22 159.23 1
637 Barasat Division Construction of Boundary wall at 2nd Pump House site for Augmentation of Gangrapota Water Supply Scheme within the jurisdiction of Bongaon Sub-Division under Barasat Division, P.H.E. Dte. ORD/000643/2023-2024 614/Bon 08/08/2023 21 A.D.ENTERPRISE. 3.66 0.00 0
638 Barasat Division Formal work order for Providing Functional Household Tap Connection (FHTC) to the uncovered household as well as convert the mouzas into Swajal Gram including laying of UPVC pipe under Augmentation work at Matiagachha W/S Scheme at Habra-II Block within the jurisdiction of Bongaon Sub-Division under Barasat Division, P.H.E. Dte. (SM/11667) ORD/000643/2024-2025 3130/BD 12/11/2024 180 M/S SUKANTA ENTERPRISE. 115.81 0.00 30
639 Barasat Division Acceptance cum work order for Providing Functional Household Tap Connection (FHTC) to the uncovered household as well as convert the mouzas into Swajal Gram including laying of UPVC pipe and tube well connection under Augmentation work at Kurulia W/S Scheme (Zone - II) Bagdah block within the jurisdiction of Bongaon Sub-Division under Barasat Division, P.H.E. Dte. ORD/000644/2024-2025 3170/BD 18/11/2024 30 MA CONSTRUCTION. 59.19 0.00 0
640 Barasat Division Formal work order for Laying of DI rising main, DI/UPVC distribution pipe line and providing Functional Household Tap Connection for Augmentation of Baunia Abad water supply scheme, Sandeshkhali-I Block within Hasnabad Sub-Division, under Barasat Division, P.H.E. Dte. ORD/000659/2022-2023 2721/BD 14/09/2022 90 KINGS & CO. 452.15 393.02 1
641 Barasat Division Formal work order for Laying of DI/UPVC distribution pipe line and providing Functional Household Tap Connection for Augmentation of Khulna Bhanderkhali W/S scheme (Zone-II), Sandeshkhali-II Block within Hasnabad Sub-Division, under Barasat Division, P.H.E. Dte. ORD/000663/2022-2023 2722/BD 14/09/2022 90 S.S.ENTERPRISE. (BAMANGACHI) 345.34 320.20 1
642 Barasat Division Acceptance cum work order for Construction of 300 cum capacity 20 mtr. staging height R.C.C. Over Head Water Reservoir as per Departmental design, drawing and specification including bored pile & pile cap at Rajbari water supply scheme, Sandeshkhali-I block under Hasnabad Sub-Division, PHE Dte. ORD/000664/2022-2023 1152/ BD 12/04/2022 240 S.S.ENTERPRISE. (BAMANGACHI) 97.05 18.73 0
643 Barasat Division Work order for Providing Functional Household Tap Connection (FHTC) to the uncovered household as well as convert the Bermajur mouza into Swajal Gram i/c laying of UPVC/PVC pipe & supply of necessary fittings within Bermajur w/s scheme, Sandeshkhali-II block under Hasnabad Sub-Division, PHE Dte. ORD/000665/2022-2023 2920/BD 26/09/2022 30 UNIFIED ENGINEERS' CO-OPERATIVE SOCIETYLTD. 24.18 24.16 1
644 Barasat Division Work order for Providing Functional Household Tap Connection (FHTC) to the uncovered household as well as convert the Sehara Radhanagar mouza into Swajal Gram i/c laying of UPVC/PVC pipe & supply of necessary fittings within Chotto Sehara w/s scheme, Sandeshkhali-I block under Hasnabad Sub-Division, PHE Dte. ORD/000666/2022-2023 2921/BD 26/09/2022 30 TRISHA ENTERPRISE & CO. 24.00 23.99 1
645 Barasat Division Work order for Providing Functional Household Tap Connection (FHTC) to the uncovered household as well as convert the different mouza into Swajal Gram i/c laying of UPVC/PVC pipe & supply of necessary fittings within Hingalganj w/s scheme (Z-II), Hingalganj block under Hasnabad Sub-Division, PHE Dte. ORD/000667/2022-2023 2922/BD 26/09/2022 30 M/S RAJPATH CONSTRUCTION. 11.95 11.94 1
646 Barasat Division Work order for Providing Functional Household Tap Connection (FHTC) to the uncovered household as well as convert the Rajbari mouza into Swajal Gram i/c laying of UPVC/PVC pipe & supply of necessary fittings within Rajbari w/s scheme, Sandeshkhali-I block under Hasnabad Sub-Division, PHE Dte. ORD/000668/2022-2023 2923/BD 26/09/2022 30 ABDUL HAMID GAZI. 11.33 11.32 1
647 Barasat Division Formal work order for Laying of DI rising main, DI/UPVC distribution pipe line and providing Functional Household Tap Connection for Augmentation of Boyermari Abad water supply scheme, Sandeshkhali-I Block within Hasnabad Sub-Division, under Barasat Division, PHE Dte. ORD/000669/2022-2023 2928/BD 26/09/2022 90 S.S.ENTERPRISE. (BAMANGACHI) 370.05 365.77 1
648 Barasat Division Formal Work Order for Providing Functional Household Tap Connection (FHTC) from existing and new proposed distribution system within the command area of Bajitur Zone-II Water Supply Scheme at Baduria Block, Dist- North 24 Parganas under Barasat Division, PHE Dte.(Phase-I) ORD/000670/2021-2022 2269/BD/BD 26/11/2021 90 ORIENT CONSTRUCTION. 128.44 114.35 1
649 Barasat Division Formal work order for Laying of UPVC distribution pipeline and Providing FHTC (Functional Household Tap Connection ) for augmentation of Gachharati water supply scheme in Basirhat-I block under Barasat Division, PHE Dte. ORD/000670/2022-2023 2934/BD 26/09/2022 90 SANJOY BAKSHI 140.52 53.21 46
650 Barasat Division Acceptance cum work order for Repair & renovation of Pump House at 2nd T/W site for Augmentation of Panchita Water Supply Scheme within the jurisdiction of Bongaon Sub-Division under Barasat Division, P.H.E. Dte. ORD/000676/2023-2024 604/Bon 04/08/2023 21 PRABIR KUMAR MONDAL. 1.78 1.75 100
651 Barasat Division Preparation of DPR in connection of augumentation of Sohai Swetpur Water Supply Scheme Zone-II under Barasat Sub Division, P.H.E. Dte. ORD/000678/2022-2023 455/BSD 20/05/2022 30 RADIANT 3.38 3.30 100
652 Barasat Division Preparation of DPR in connection of augumentation of Chandrapur Water Supply Scheme under Barasat Sub Division, P.H.E. Dte. ORD/000679/2022-2023 456/BSD 20/05/2022 30 RADIANT 4.58 0.00 100
653 Barasat Division Preparation of DPR in connection of augumentation of Nebadhui Duttapukur Water Supply Scheme under Barasat Sub Division, P.H.E. Dte. ORD/000680/2022-2023 457/BSD 20/05/2022 30 RADIANT 3.70 3.34 100
654 Barasat Division Formal work order for Laying of DI/UPVC distribution system pipeline and Providing FHTC (Functional Household Tap Connection)for augmentation of Sangrampur water supply scheme in Basirhat-I block under Barasat Division, PHE Dte. ORD/000681/2022-2023 3196/BD 01/11/2022 90 H.I.ENTERPRISE. 654.07 647.44 83
655 Barasat Division Formal work order for the work of Laying of Di/UPVC distribution pipe line, construction of 500cum capacity 20mtr staging height R.C.C over Head Reservoir as per Deptt. design, drawing & specification including bored pile with pile cap and providing Functional Household Tap Connection in connection with Augmentation of Durgapur Baylani Water Supply Scheme(Zone-I), Hingalganj Block under Hasnabad Sub-Division, PHE Dte. ORD/000682/2023-2024 2458/BD 17/08/2023 731 APURBA MANDAL 844.50 542.92 71
656 Barasat Division Formal work order for Laying of DI/UPVC distribution pipe line and providing Functional Household Tap Connection for Augmentation of Khulna Bhanderkhali W/S scheme (Zone-I), Sandeshkhali-II Block under Hasnabad Sub-Division, PHE Dte. ORD/000683/2022-2023 3182/BD 01/11/2022 90 UMWELT ENGINEER PVT.LTD. 497.55 365.15 100
657 Barasat Division Acceptance cum work order for Sinking of 1 (one) no. 250 mm. x 150 mm. dia. 300 mtr deep as a Replacement of Tubewell by D.R. Rig method, having 250mm dia 36.0 mtr. long UPVC housing pipe & 150mm dia 30 mtr. long UPVC ribbed strainer for Augmentation of Kashimpur Water Supply Scheme at Head Work Site under Barasat Sub-Division, PHE Dte. ORD/000683/2023-2024 2460/BD 17/08/2023 30 M/S K.P.PAL. 16.08 11.87 100
658 Barasat Division Formal work order for Laying of DI/UPVC distribution pipe line and Providing FHTC (Functional Household Tap Connection ) by augmentation for Ghona water supply scheme in Basirhat-II Block of North 24 Parganas District under Barasat Division, PHE Dte. ORD/000685/2022-2023 3184/BD 01/11/2022 90 SHIBU BISWAS. 179.98 130.01 85
659 Barasat Division Acceptance cum work order for Protection Emergent restoration of concrete road for damage portion at different places for providing FHTC within Kumarjole w/s scheme, Minakhan block under Hasnabad Sub-Division P.H.E. Dte. ORD/000696/2021-2022 1984/HSD 02/12/2021 7 ABDUL ALIM MONDAL. 2.46 2.46 1
660 Barasat Division Acceptance cum work order for balance works of Augmentation (including FHTC) within the command area of Masia and Nabastya Piped Water Supply Scheme at Baduria Block under Barasat Division, PHE Dte. ORD/000698/2024-2025 3185/BD 18/11/2024 330 GHOSH CONSTRUCTION. 32.23 0.00 80
661 Barasat Division Acceptance cum work order for Emergent restoration of concrete road for damage portion at different places due to laying of new DI/UPVC pipe line in Champali mouza within Champali w/s scheme, Minakhan block under Hasnabad Sub-Division P.H.E. Dte. ORD/000699/2021-2022 1987/HSD 02/12/2021 7 S.K.ENTERPRISE. 2.44 2.44 1
662 Barasat Division Acceptance cum work order for Emergent restoration of concrete road for damage portion at different places for providing FHTC in Noorpur/Bokchara mouza within Noorpur w/s scheme, Minakhan block under Hasnabad Sub-Division P.H.E. Dte. ORD/000701/2021-2022 1989/HSD 02/12/2021 7 MONDAL & CO. (BASIRHAT). 1.63 1.63 1
663 Barasat Division Acceptance cum work order for Construction of the Boundary wall in Pump House No. 3 of Bergum Piped Water Supply Scheme in connection with Augmentation work under JJM project within the jurisdiction of Habra Sub-Division under Barasat Division, PHE Dte. ORD/000701/2024-2025 3159/BD 14/11/2024 45 AREOCON. 8.62 0.00 0
664 Barasat Division Acceptance cum work order for Protection of newly laid DI/UPVC pipe line by UC bullah pile at different places in Champali mouza within Champali w/s scheme, Minakhan block under Hasnabad Sub- Division P.H.E. Dte. ORD/000703/2021-2022 1991/HSD 02/12/2021 10 M/S NIRMAN CONSTRUCTION. 4.38 4.38 1
665 Barasat Division Acceptance cum work order for Restoration of existing concrete road for damaged portion due to movement of heavy vehicles during construction of OHR at Bermajur H.W. site within Bermajur w/s scheme, Sandeshkhali-II block under Hasnabad Sub- Division P.H.E. Dte. (Part-A) ORD/000704/2021-2022 1992/HSD 02/12/2021 15 UNIFIED ENGINEERS' CO-OPERATIVE SOCIETYLTD. 4.40 4.39 1
666 Barasat Division Acceptance cum work order for Sinking of 1 no. 300mm. x 200 mm. big dia 300 mtr deep Tube well by Direct Rotary Rig method using PVC pipe & strainer having 300 mm Dia 42 mtr. long Housing Pipe and 200mm Dia 30 mtr. long filter for Augmentation of Debhog Water Supply Scheme in Basirhat - I Block of Basirhat Sub- Division under Barasat Division, P.H.E Dte. ORD/000704/2024-2025 3254/BD 25/11/2024 30 ROHAN MONDAL. 21.41 0.00 0
667 Barasat Division Acceptance cum work order for Restoration of existing concrete road for damaged portion due to movement of heavy vehicles during construction of OHR at Bermajur H.W. site within Bermajur w/s scheme, Sandeshkhali-II block under Hasnabad Sub- Division P.H.E. Dte. (Part-B) ORD/000705/2021-2022 1993/HSD 02/12/2021 15 UNIFIED ENGINEERS' CO-OPERATIVE SOCIETYLTD. 4.78 4.78 1
668 Barasat Division Acceptance cum work order for Emergent restoration of concrete road for damage portion at different places for providing FHTC within Bouthakurani w/s scheme, Sandeshkhali-II block under Hasnabad Sub-Division P.H.E. Dte. ORD/000706/2021-2022 1994/HSD 02/12/2021 7 SRI KRISHNA CO-OP-LABOUR CONTRACT AND CONST SOC LTD. 2.00 2.00 1
669 Barasat Division Construction of Boundary wall at 2nd T/W site for Augmentation of Krishnacandrapur Water Supply Scheme within the jurisdiction of Bongaon Sub-Division under Barasat Division, P.H.E. Dte. ORD/000716/2023-2024 611/Bon 08/08/2023 21 ACHINTA KUMAR HALDER. 4.70 0.00 0
670 Barasat Division Formal work order for Laying of UPVC distribution pipe line and Providing FHTC (Functional Household Tap Connection) for Augmentation of Banglani Water Supply Scheme in Swarupnagar Block of North 24 Parganas District under Barasat Division, P.H.E. Dte. ORD/000717/2023-2024 2518/BD 22/08/2023 676 KINGS & CO. 606.14 433.25 59
671 Barasat Division Acceptance cum work order for Sinking of 1 no. 300 mm. x 200 mm. dia. 300 mtr deep Tubewell by D.R. Rig method with PVC pipe & strainer having 300mm dia 48 mtr. long housing pipe & 200mm dia 30 mtr. long filter for Augmentation of Bouthakurani w/s scheme (Z-I), Sandeshkhali-IIblock under Hasnabad Sub-Division, P.H.E. Dte. ORD/000719/2023-2024 2472/BD 18/08/2023 30 M/S DATTA ENTERPRISE. 26.97 21.39 100
672 Barasat Division Acceptance cum work order for Sinking of 1 no. 300 mm. x 200 mm. dia. 250 mtr deep Tubewell by D.R. Rig method at PH No.-2 with PVC pipe & strainer having 300mm dia 48 mtr. long housing pipe & 200mm dia 30 mtr. long filter for Augmentation of Mohanpur w/s scheme (Z-I), Minakhan block under Hasnabad Sub-Division, P.H.E. Dte. ORD/000720/2023-2024 2473/BD 18/08/2023 30 ABDUL ALIM MONDAL. 16.45 13.27 100
673 Barasat Division Formal work order for "Laying of DI rising main, DI/UPVC distribution pipe line, Providing Functional Household Tap Connection & Construction of 400 cum capacity 20 mtr staging height R.C.C Over Head water Reservoir as per Department design, drawing & specification including bored pile & pile cap in connection with Nityaberia water supply scheme, Sandeshkhali-I Block under Hasnabad Sub-Division, P.H.E. Dte. ORD/000721/2023-2024 2577/BD 25/08/2023 1096 KINGS & CO. 859.85 173.69 25
674 Barasat Division Acceptance cum work order Sinking of 1 no. 300 mm. x 200 mm. dia. 360 mtr deep Tubewell by D.R. Rig method at PH No.-2 with PVC pipe & strainer having 300mm dia 48 mtr. long housing pipe & 200mm dia 30 mtr. long filter for Augmentation of Monipur w/s scheme, Sandeshkhali-II block under Hasnabad Sub-Division, P.H.E. Dte. ORD/000722/2023-2024 2474/BD 18/08/2023 30 M/S RAJPATH CONSTRUCTION. 31.64 25.14 100
675 Barasat Division Acceptance cum work order for Sinking of 2 nos. 300 mm. x 200 mm. dia. 360 mtr deep Tubewell by D.R. Rig method at PH No.-1 & 2 with PVC pipe & strainer having 300mm dia 48 mtr. long housing pipe & 200mm dia 30 mtr. long filter for Augmentation of Gabberia w/s scheme, Sandeshkhali-II block under Hasnabad Sub-Division, P.H.E. Dte. ORD/000723/2023-2024 2475/BD 18/08/2023 30 M/S RAJPATH CONSTRUCTION. 63.23 43.58 92
676 Barasat Division Formal work order for Construction of switch room cum chlorine room with sanitary & water supply arrangement i/c plinth protection at PH No.-1 (Size-5.40x3.60 mtr.) & PH No-2 & 3 (Size-3.60x3.00 mtr.), Laying of DI rising main and DI/UPVC distribution pipe line, Providing Functional Household Tap Connection, Protection works for different dia. DI/UPVC rising/distribution pipeline by UC bullah/Bamboo pile at different places, Construction of 200 cum capacity 20 mtr staging height R.C.C Over Head Reservoir as per Departmental design, drawing and specification including bored pile & pile cap for Ketarchak water supply scheme, Hingalganj Block under Hasnabad Sub-Division, P.H.E. Dte. under Barasat Division, P.H.E. Dte. ORD/000724/2023-2024 2615/BD 29/08/2023 366 MONDAL PRECISION PVT.LTD 507.61 75.88 30
677 Barasat Division Acceptance cum work order for Sinking of 2 nos. 300 mm. x 200 mm. dia. 360 mtr deep Tubewell by D.R. Rig method at PH No.-3 & 4 with PVC pipe & strainer having 300mm dia 48 mtr. long housing pipe & 200mm dia 30 mtr. long filter for Augmentation of Kalitala w/s scheme (Z-I), Hingalganj block under Hasnabad Sub-Division, P.H.E. Dte. ORD/000726/2023-2024 2476/BD 18/08/2023 30 M/S DATTA ENTERPRISE. 63.24 47.03 98
678 Barasat Division Formal work order for Construction of switch room cum chlorine room with sanitary & water supply arrangement i/c plinth protection at PH No.-1 (Size-5.40x3.60 mtr.) & PH No- 2 & 3 (Size-3.60x3.00 mtr.), Laying of DI rising main and DI/UPVC distribution pipe line, Protection works for different dia. UPVC/DI distribution pipeline by UC bullah/Bamboo pile at different places, Construction of 200 cum capacity 20 mtr staging height R.C.C Over Head water Reservoir as per Departmental design, drawing and specification including bored pile & pile cap for Bhandarkhali water supply scheme, Hingalganj Block under Hasnabad Sub-Division, P.H.E. Dte. under Barasat Division, P.H.E. Dte. ORD/000725/2023-2024 2512/BD 22/08/2023 366 M/S NIRMAN CONSTRUCTION. 521.98 270.10 60
679 Barasat Division Acceptance cum work order for Sinking of 2 nos. 300 mm. x 200 mm. dia. 360 mtr deep Tubewell by D.R. Rig method at PH No.-3 & 4 with PVC pipe & strainer having 300mm dia 48 mtr. long housing pipe & 200mm dia 30 mtr. long filter for Augmentation of Kalitala w/s scheme (Z-II), Hingalganj block under Hasnabad Sub-Division, P.H.E. Dte. ORD/000728/2023-2024 2477/BD 18/08/2023 30 M/S PROGATI ENTERPRISE. 63.27 43.87 71
680 Barasat Division Acceptance cum work order for Sinking of 1 no. 300 mm. x 200 mm. dia. 360 mtr deep Tubewell by D.R. Rig method at PH No.-3 with PVC pipe & strainer having 300mm dia 48 mtr. long housing pipe & 200mm dia 30 mtr. long filter for Augmentation of Rupmari w/s scheme (Z-I), Hingalganj block under Hasnabad Sub-Division, P.H.E. Dte. ORD/000730/2023-2024 2479/BD 18/08/2023 30 ABDUL ALIM MONDAL. 25.81 19.29 77
681 Barasat Division Construction of Approach Road Head Work at site for Augmentation of Kurulia (Zone-II) Water Supply Scheme within the jurisdiction of Bongaon Sub-Division under Barasat Division, P.H.E. Dte. ORD/000731/2023-2024 621/Bon 08/08/2023 25 GHOSH CONSTRUCTION. 4.75 4.74 100
682 Barasat Division Acceptance cum work order for Sinking of 2 nos. 300 mm. x 200 mm. dia. 360 mtr deep Tubewell by D.R. Rig method at PH No.-2 & 3 with PVC pipe & strainer having 300mm dia 48 mtr. long housing pipe & 200mm dia 30 mtr. long filter for Augmentation of Hingalganj w/s scheme (Zone-I), Hingalganj block under Hasnabad Sub-Division, P.H.E. Dte. ORD/000732/2023-2024 2480/BD 18/08/2023 30 SRI KRISHNA CO-OP-LABOUR CONTRACT AND CONST SOC LTD. 51.64 38.28 100
683 Barasat Division Acceptance cum work order for Sinking of 2 nos. 300 mm. x 200 mm. dia. 360 mtr deep Tubewell by D.R. Rig method at PH No.-4 & 5 with PVC pipe & strainer having 300mm dia 48 mtr. long housing pipe & 200mm dia 30 mtr. long filter for Augmentation of Hingalganj w/s scheme (Zone-I), Hingalganj block under Hasnabad Sub-Division, P.H.E. Dte. ORD/000733/2023-2024 2482/BD 18/08/2023 30 MONDAL & CO. (BASIRHAT). 51.60 38.01 100
684 Barasat Division Acceptance cum work order for Sinking of 2 nos. 300 mm. x 200 mm. dia. 360 mtr deep Tubewell by D.R. Rig method at PH No.-5 & 6 with PVC pipe & strainer having 300mm dia 48 mtr. long housing pipe & 200mm dia 30 mtr. long filter for Augmentation of Hingalganj w/s scheme (Zone-II), Hingalganj block under Hasnabad Sub-Division, P.H.E. Dte. ORD/000735/2023-2024 2489/BD 18/08/2023 30 M/S DATTA ENTERPRISE. 51.63 38.75 100
685 Barasat Division Formal work order for Laying of DI/UPVC distribution pipe line and Providing FHTC (Functional Household Tap Connection ) for augmentation of Kapileswarpur water supply scheme in Swarupnagar Block of North 24 Parganas District under Barasat Division, PHE Dte. ORD/000736/2022-2023 3305/BD 10/11/2022 90 KINGS & CO. 240.31 205.30 90
686 Barasat Division Acceptance cum work order for Sinking of 1 no. 300 mm. x 200 mm. dia. 300 mtr deep Tubewell by D.R. Rig method at PH No.-2 with PVC pipe & strainer having 300mm dia 48 mtr. long housing pipe & 200mm dia 30 mtr. long filter for Augmentation of Khulna Bhanderkhali w/s scheme (Z-I), Sandeshkhali-II block under Hasnabad Sub-Division, P.H.E. Dte. ORD/000736/2023-2024 2490/BD 18/08/2023 30 M/S DATTA ENTERPRISE. 26.91 21.67 100
687 Barasat Division Acceptance cum work order for Sinking of 1 no. 300 mm. x 200 mm. dia. 300 mtr deep Tubewell by D.R. Rig method with PVC pipe & strainer having 300mm dia 48 mtr. long housing pipe & 200mm dia 30 mtr. long filter for Augmentation of Khulna Bhanderkhali w/s scheme (Z-II), Sandeshkhali-II block under Hasnabad Sub-Division, P.H.E. Dte. ORD/000737/2023-2024 2491/BD 18/08/2023 30 M/S PROGATI ENTERPRISE. 26.89 20.57 100
688 Barasat Division Formal work order for Laying of DI/UPVC distribution pipe line and Providing FHTC (Functional Household Tap Connection ) for augmentation of Raharhati water supply scheme in Basirhat-II Block of North 24 Parganas District under Barasat Division, PHE Dte. ORD/000738/2022-2023 3306/BD 10/11/2022 90 M/S PRADIP KUMAR PAL 139.59 139.49 99
689 Barasat Division Acceptance cum work order for Sinking of 1 no. 300 mm. x 200 mm. dia. 300 mtr deep Tubewell by D.R. Rig method with PVC pipe & strainer having 300mm dia 48 mtr. long housing pipe & 200mm dia 30 mtr. long filter for Augmentation of Durgapur Baylani w/s scheme (Z-I), Hingalganj block under Hasnabad Sub-Division, P.H.E. Dte. ORD/000738/2023-2024 2492/BD 18/08/2023 30 M/S RAJPATH CONSTRUCTION. 21.95 20.25 66
690 Barasat Division Acceptance cum work order for Sinking of 2 nos. 300 mm. x 200 mm. dia. 300 mtr deep Tubewell by D.R. Rig method with PVC pipe & strainer having 300mm dia 48 mtr. long housing pipe & 200mm dia 30 mtr. long filter for Augmentation of Malancha w/s scheme (Z-I), Minakhan block under Hasnabad Sub-Division, P.H.E. Dte. ORD/000740/2023-2024 2493/BD 18/08/2023 30 M/S RAJPATH CONSTRUCTION. 43.90 34.01 80
691 Barasat Division Formal work order for Laying of UPVC distribution pipe line and Providing FHTC (Functional Household Tap Connection ) for augmentation of Maminpur water supply scheme in Basirhat-II block under Barasat Division, PHE Dte. ORD/000742/2022-2023 3340/BD 16/11/2022 769 MONDAL PRECISION PVT.LTD 194.77 155.27 83
692 Barasat Division Acceptance cum work order for Sinking of 1 no. 300 mm. x 200 mm. dia. 300 mtr deep Tubewell by D.R. Rig method with PVC pipe & strainer having 300mm dia 48 mtr. long housing pipe & 200mm dia 30 mtr. long filter for Augmentation of Kanaikati Kathalberia w/s scheme (Z-I), Hingalganj block under Hasnabad Sub-Division, P.H.E. Dte. ORD/000742/2023-2024 2494/BD 18/08/2023 30 SRI KRISHNA CO-OP-LABOUR CONTRACT AND CONST SOC LTD. 26.90 20.67 33
693 Barasat Division Formal work order for Laying of DI/UPVC distribution pipe line and Providing FHTC (Functional Household Tap Connection ) for augmentation of Bansjhari Mallikpur water supply scheme in Basirhat-I block under Barasat Division, PHE Dte. ORD/000743/2022-2023 3341/BD 16/11/2022 867 UTPAL CONSTRUCTION & CO. 227.32 169.23 90
694 Barasat Division Sinking of 1 no. 300 mm. x 200 mm. dia. 300 mtr deep Tubewell by D.R. Rig method with PVC pipe & strainer having 300mm dia 48 mtr. long housing pipe & 200mm dia 30 mtr. long filter for Augmentation of Kanaikati Kathalberia w/s scheme (Z-II), Hingalganj block under Hasnabad Sub-Division, P.H.E. Dte. ORD/000743/2023-2024 2495/BD 18/08/2023 30 SRI KRISHNA CO-OP-LABOUR CONTRACT AND CONST SOC LTD. 26.90 19.22 70
695 Barasat Division Formal work order for Laying of DI/UPVC distribution pipe line and Providing FHTC (Functional Household Tap Connection ) for augmentation of Magurali water supply scheme in Baduria block under Barasat Division, PHE Dte. ORD/000744/2022-2023 3342/BD 16/11/2022 984 J.D.J.ENTERPRISE. (TRADERS PVT.LTD) 567.42 400.47 71
696 Barasat Division Acceptance cum work order for Sinking of 2 nos. 300 mm. x 200 mm. dia. 180 mtr deep Tubewell by D.R. Rig method at PH No.-1 & 2 with PVC pipe & strainer having 300 mm dia 48 mtr. long housing pipe & 200 mm dia 30 mtr. long filter for Augmentation of Chaimalpur w/s scheme, Hasnabad block under Hasnabad Sub-Division, P.H.E. Dte. ORD/000744/2023-2024 2496/BD 21/08/2023 30 ANJALI ENTERPRISE. 26.02 18.61 69
697 Barasat Division Formal work order for Laying of DI/UPVC distribution pipe line and Providing FHTC (Functional Household Tap Connection ) for augmentation of Dhanyakuria water supply scheme in Basirhat-II block under Barasat Division, PHE Dte. ORD/000745/2022-2023 3343/BD 16/11/2022 991 ALOK ENTERPRSE. (A UNIT OF SAKET TREXIM PVT.LTD) 888.30 529.45 36
698 Barasat Division Formal work order for Laying of DI/UPVC distribution pipe line and Providing FHTC (Functional Household Tap Connection ) for augmentation of Raghunathpur water supply scheme in Basirhat-II block under Barasat Division, PHE Dte. ORD/000746/2022-2023 3344/BD 16/11/2022 90 UTPAL CONSTRUCTION & CO. 180.46 155.48 88
699 Barasat Division Formal work order for Laying of DI/UPVC distribution pipe line and Providing FHTC (Functional Household Tap Connection ) for augmentation of Masia Nabastia water supply scheme in Baduria block under Barasat Division, PHE Dte. ORD/000747/2022-2023 3372/BD 18/11/2022 90 GHOSH CONSTRUCTION. 146.63 126.32 85
700 Barasat Division Formal work order for Laying of DI/UPVC distribution pipe line and Providing FHTC (Functional Household Tap Connection ) for augmentation of Dakshin Debipur water supply scheme in Basirhat-II block under Barasat Division, PHE Dte. ORD/000748/2022-2023 3373/BD 18/11/2022 90 CHANCHAL ENTERPRISE & CO. 212.57 212.53 85
701 Barasat Division Laying of badly damaged distribution pipe line with bamboo pile beside road and other allied works at Ashudi water supply scheme under Bongaon Sub-Division, P.H.E.Dte. ORD/000748/2023-2024 603/Bon 04/08/2023 15 ROY CHOWDHURY CONSTRUCTION. 1.62 1.61 100
702 Barasat Division Formal work order for Laying of DI/UPVC distribution pipe line and Providing FHTC (Functional Household Tap Connection ) for augmentation of Akipur water supply scheme in Basirhat-II block under Barasat Division, PHE Dte. ORD/000749/2022-2023 3374/BD 18/11/2022 90 SUPER SKILL. 145.01 105.64 50
703 Barasat Division Formal work order for Laying of DI/UPVC distribution pipe line and Providing FHTC (Functional Household Tap Connection ) for augmentation of Sonpur water supply scheme in Swarupnagar block under Barasat Division, PHE Dte. ORD/000750/2022-2023 3401/BD 21/11/2022 90 M/S ANUBHAB CONSTRUCTION. 133.98 127.70 95
704 Barasat Division Acceptance cum Work Order for Providing Functional Household Tap Connection (FHTC) in connection with Jal Jeevan Mission (JJM and Jal Swapna) under command area of Sindrani (Zone-I) Water Supply Scheme at Bagdah Block under Barasat Division, PHE Dte. (Phase-I). ORD/000751/2021-2022 2387/BD 09/12/2021 45 DEBAPRASAD MONDAL. 73.93 73.41 1
705 Barasat Division Formal work order for Construction of 500cum capacity 20mtr staging height R.C.C Over Head Reservoir as per Departmental design, drawing and specification including bored pile & pile cap for Augmentation of Barunhat Patlikhanpur water supply Scheme(Z-I), Hasnabad Block under Hasnabad Sub-Division PHE Dte. ORD/000751/2023-2024 2611/BD 29/08/2023 365 MONDAL & CO. (BASIRHAT). 203.70 185.49 100
706 Barasat Division Acceptance cum Work Order for Providing Functional Household Tap Connection (FHTC) in connection with Jal Jeevan Mission (JJM and Jal Swapna) under command area of Kankpul Water Supply Scheme at Habra-II Block within the jurisdiction of Habra Sub-Division, under Barasat Division, PHE Dte. (Phase-I). ORD/000752/2021-2022 2388/BD 09/12/2021 45 S.S.ENTERPRISE. (BAMANGACHI) 82.85 71.02 1
707 Barasat Division Acceptance cum Work Order for Providing Functional Household Tap Connection (FHTC) in connection with Jal Jeevan Mission (JJM and Jal Swapna) under command area of Janaphul Water Supply Scheme at Habra-I Block within the jurisdiction of Habra Sub-Division, under Barasat Division, PHE Dte. (Phase-I). ORD/000753/2021-2022 2389/BD 09/12/2021 45 ORIENT CONSTRUCTION. 72.42 67.56 1
708 Barasat Division Formal work order for construction of 450 cum capacity 20 mtr. staging height R.C.C. Over Head water Reservoir as per Departmental design, drawing and specification including bored pile & pile cap for Augmentation of Khulna Bhanderkhali water supply scheme (Zone - I), Sandeshkhali-II Block under Hasnabad Sub-Division, P.H.E. Dte. ORD/000753/2023-2024 2610/BD 29/08/2023 1095 M/S PROGATI ENTERPRISE. 194.78 0.00 0
709 Barasat Division Acceptance cum Work Order for Providing Functional Household Tap Connection (FHTC) in connection with Jal Jeevan Mission (JJM and Jal Swapna) under command area of Kamarpur & its adjoining mouzas Water Supply Scheme at Habra-II Block within the jurisdiction of Habra Sub-Division, under Barasat Division, PHE Dte. (Phase-I). ORD/000754/2021-2022 2390/BD 09/12/2021 45 SHIBU BISWAS. 53.39 50.82 1
710 Barasat Division Formal work order for Construction of 550cum capacity 20mtr staging height R.C.C Over Head Reservoir as per Departmental design, drawing and specification including bored pile & pile cap and laying of Rising main & distribution pipe line by DI & UPVC and Providing FHTC for Augmentation of Joypul water supply Scheme under Barasat Sub-Division PHE Dte. ORD/000754/2023-2024 2549/BD 23/08/2023 617 MONDAL ENTERPRISE. (BARASAT) 650.34 254.43 60
711 Barasat Division Acceptance cum work order for Pump connection at PH No-5 & other allied works for Augmentation of Rupmari w/s scheme, Hingalganj Block under Hasnabad Sub-Division P.H.E. Dte. ORD/000755/2022-2023 616/HSD 07/04/2022 15 GOBINDA DAS. 1.97 1.97 1
712 Barasat Division Formal work order for Construction of 400cum capacity 20mtr staging height R.C.C Over Head Reservoir as per Departmental design, drawing and specification including bored pile & pile cap for Augmentation of Kumarjole water supply Scheme, Minakhan Block under Hasnabad Sub-Division PHE Dte. ORD/000755/2023-2024 2612/BD 29/08/2023 365 S.S.ENTERPRISE. (BAMANGACHI) 153.33 140.36 100
713 Barasat Division Acceptance cum work order for Emergent supply, fitting & fixing of Main gate and other allied works at OHR site within Bermajur w/s scheme, Sandeshkhali-II block under Hasnabad Sub- Division P.H.E. Dte. ORD/000756/2022-2023 617/HSD 07/04/2022 15 UNIFIED ENGINEERS' CO-OPERATIVE SOCIETYLTD. 0.60 0.60 1
714 Barasat Division Acceptance cum work order for Emergent restoration of DI rising main from near Sahapur more to near OHR for damaged portion due to widening & strengthing of PWD road within Hingalganj w/s scheme (Zone-I), Hingalganj Block under Hasnabad Sub-Division P.H.E. Dte. ORD/000757/2022-2023 619/HSD 07/04/2022 15 MONDAL & CO. (BASIRHAT). 4.81 4.67 1
715 Barasat Division Acceptance cum work order for Emergent restoration of 150mm dia. DI rising main from near Kathabari more to CWR i/c CWR connection within Hingalganj w/s scheme (Zone-II), Hingalganj Block under Hasnabad Sub-Division P.H.E. Dte. ORD/000758/2022-2023 620/HSD 07/04/2022 15 M/S NIRMAN CONSTRUCTION. 3.28 3.28 1
716 Barasat Division Acceptance cum work order for Emergent restoration of pipeline by withdrawing & relaying of 90 mm dia. UPVC pipe line at different places of Rajbari W/S Scheme, Sandeshkhali-I block under Hasnasbad Sub-Division, P.H.E.Dte. ORD/000759/2022-2023 621/HSD 07/04/2022 15 UNIFIED ENGINEERS' CO-OPERATIVE SOCIETYLTD. 1.52 1.50 1
717 Barasat Division Formal work order for Construction of 700cum capacity 20mtr staging height R.C.C Over Head Reservoir as per Departmental design, drawing and specification including bored pile & pile cap and providing FHTC for Augmentation of Berachampa Zone-I water supply Scheme under Barasat Sub-Division PHE Dte. ORD/000759/2023-2024 2552/BD 24/08/2023 366 MONDAL ENTERPRISE. (BARASAT) 777.60 185.11 24
718 Barasat Division Acceptance cum work order for Emergent restoration of concrete road for damage portion at different places due to laying of new DI/UPVC pipe line within Hingalganj w/s scheme (Zone-II), Hingalganj block under Hasnabad Sub-Division P.H.E. Dte. ORD/000760/2022-2023 622/HSD 07/04/2022 15 M/S NIRMAN CONSTRUCTION. 2.34 0.00 1
719 Barasat Division Formal work order for Construction of 450cum capacity 20mtr staging height R.C.C Over Head Reservoir as per Departmental design, drawing and specification including bored pile & pile cap and providing FHTC for Augmentation of Deara water supply Scheme under Barasat Sub-Division PHE Dte. ORD/000760/2023-2024 2561/BD 24/08/2023 366 SINGHA ROY & CO. 507.92 103.06 25
720 Barasat Division Acceptance cum work order for Emergent restoration of concrete road for damage portion at different places due to laying of new DI/UPVC pipe line within Hingalganj w/s scheme (Zone-I), Hingalganj block under Hasnabad Sub-Division P.H.E. Dte. ORD/000762/2022-2023 629/HSD 08/04/2022 15 MONDAL & CO. (BASIRHAT). 2.45 2.45 1
721 Barasat Division Formal work order for construction of 750 cum capacity 20 mtr. height R.C.C. Over Head Water Reservoir as per Departmental design, drawing and specification including bored pile & pile cap and laying of Rising main & distribution pipe line by DI & UPVC and providing FHTC for Augmentaion of Bodai (Zone-II) water supply scheme under Barsasat Sub-Division, P.H.E. Dte. ORD/000763/2023-2024 2617/BD 29/08/2023 366 SUPRITI ENTERPRISE. 874.90 144.08 20
722 Barasat Division Formal work order for Construction of switch room cum chlorine room with sanitary & water supply arrangement including plinth protection at PH No.-1 (Size-5.40x3.60 mtr.) & PH No-2 & 3 (Size-3.60x3.00 mtr.), Laying of DI rising main, DI/UPVC distribution pipe line, Providing Functional Household Tap Connection, Protection works for different dia. UPVC/DI distribution pipeline by UC bullah/Bamboo pile at different places, Construction of 300 cum capacity 20 mtr. staging height R.C.C. Over Head Water Reservoir as per Departmental design, drawing and specification including bored pile & pile cap for Mallick Gheri W/S Scheme, Minakhan Block under Hasnabad Sub-Division, P.H.E. Dte. ORD/000765/2023-2024 2579/BD 25/08/2023 1096 M/S DATTA ENTERPRISE. 500.78 274.68 75
723 Barasat Division Formal work order for laying of DI/UPVC distribution pipe line and Providing Functional House Hold Tap Connection (FHTC) For Augmentation of Ramnagar Water Supply Scheme under Bongaon Sub-Division, PHE Dte. ORD/000766/2022-2023 3472/BD 01/12/2022 90 SRI KRISHNA CO-OP-LABOUR CONTRACT AND CONST SOC LTD. 200.08 199.57 1
724 Barasat Division Formal work order for Construction of switch room cum chlorine room with sanitary & water supply arrangement including plinth protection at PH No.-1 (Size-5.40x3.60 mtr.) & PH No-2 & 3 (Size-3.60x3.00 mtr.), Laying of DI rising main, DI/UPVC distribution pipe line, Providing Functional Household Tap Connection, Protection works for different dia. UPVC/DI distribution pipeline by UC bullah/Bamboo pile at different places, Construction of 250 cum capacity 20 mtr. staging height R.C.C. Over Head Water Reservoir as per Departmental design, drawing and specification including bored pile & pile cap within Uchildaha W/S Scheme, Minakhan Block under Hasnabad Sub-Division, P.H.E. Dte. ORD/000766/2023-2024 2581/BD 25/08/2023 366 MONDAL & CO. (BASIRHAT). 488.99 384.77 75
725 Barasat Division Acceptance cum work order for Route Survey, Design Drawing & DPR Preparation for Augmentation of Chhoto Sehara Piped Water Supply Scheme under Barasat Division, PHE Dte. ORD/000767/2022-2023 631/HSD 08/04/2022 15 TIYAS CONSULTANCY AND INFRASTRUCTURE PVT.LTD. 2.78 2.78 0
726 Barasat Division Acceptance cum work order for Sinking of 1(one) no. 300mm x 200 mm. dia. Replacement of Tube well 250 mtr deep by D.R. method with UPVC pipe & UPVC ribbed strainer for Augmentation of Ghatpatila (Zone-II) water supply scheme at 2nd T/W Site under Bongaon Sub-Division P.H.E.Dte. ORD/000767/2023-2024 2688/BD 04/09/2023 30 B.M.ENGINEERING. & CONSTRUCTION. 16.13 13.46 100
727 Barasat Division Acceptance cum work order for Providing Functional Household Tap Connection (FHTC) to the uncovered household as well as convert the mouzas into Swajal Gram including laying of UPVC pipe and allied works under Augmentation work at Helencha W/S Scheme Bagdah block within the jurisdiction of Bongaon Sub-Division under Barasat Division, P.H.E. Dte. (Part-B). ORD/000767/2024-2025 3267/BD 25/11/2024 300 ABDUL HAMID GAZI. 27.07 0.00 35
728 Barasat Division Acceptance cum work order for Route Survey, Design Drawing & DPR Preparation for Augmentation of Sultanpur Piped Water Supply Scheme under Barasat Division, PHE Dte. ORD/000768/2022-2023 632/HSD 08/04/2022 15 SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. 3.00 3.00 1
729 Barasat Division Acceptance cum work order for Sinking of 1(one) no. 300mm x 200 mm. dia. Replacement of Tube well 250 mtr deep by D.R. method with UPVC pipe & UPVC ribbed strainer for Augmentation of Kaniara water supply scheme at Head Work Site under Bongaon Sub-Division P.H.E.Dte. ORD/000768/2023-2024 2689/BD 04/09/2023 30 B.M.ENGINEERING. & CONSTRUCTION. 16.12 13.83 100
730 Barasat Division Acceptance cum work order for Route Survey, Design Drawing & DPR Preparation for Augmentation of Rajbari Piped Water Supply Scheme under Barasat Division, PHE Dte. ORD/000769/2022-2023 633/HSD 08/04/2022 15 SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. 3.72 3.72 1
731 Barasat Division Acceptance cum work order for Sinking of 1(one) no. 300mm x 200 mm. dia. Replacement of Tube well 250 mtr deep by D.R. method with UPVC pipe & UPVC ribbed strainer for Augmentation of Kaniara water supply scheme at 2nd T/W Site under Bongaon Sub-Division P.H.E.Dte. ORD/000769/2023-2024 2687/BD 04/09/2023 30 B.M.ENGINEERING. & CONSTRUCTION. 16.12 13.64 100
732 Barasat Division Acceptance cum work order for Sinking of 1 no. 300mm. x 200 mm. big dia 300 mtr deep Tube well by Direct Rotary Rig method at Pump House 2 using PVC pipe & strainer having 300 mm Dia 42 mtr. long Housing Pipe and 200mm Dia 30 mtr. long filter for Augmentation of Eojnagar Water Supply Scheme in Basirhat - II Block of Basirhat Sub- Division under Barasat Division, PHE Dte. ORD/000769/2024-2025 3257/BD 25/11/2024 90 GHOSH CONSTRUCTION. 21.75 0.00 0
733 Barasat Division Acceptance cum work order for Route Survey, Design Drawing & DPR Preparation for Augmentation of Bermajur Piped Water Supply Scheme under Barasat Division, PHE Dte. ORD/000770/2022-2023 634/HSD 08/04/2022 15 TIYAS CONSULTANCY AND INFRASTRUCTURE PVT.LTD. 4.32 4.32 0
734 Barasat Division Acceptance cum work order for Sinking of 1 no. 300mm. x 200 mm. big dia 300 mtr deep Tube well by Direct Rotary Rig method at Pump House 1 using PVC pipe & strainer having 300 mm Dia 42 mtr. long Housing Pipe and 200mm Dia 30 mtr. long filter for Augmentation of Jafarpur Water Supply Scheme in Basirhat - II Block of Basirhat Sub- Division under Barasat Division, PHE Dte. ORD/000770/2024-2025 3256/BD 25/11/2024 90 GHOSH CONSTRUCTION. 21.75 0.00 0
735 Barasat Division Acceptance cum work order for Route Survey, Design Drawing & DPR Preparation for Augmentation of Hingalganj Zone - I Piped Water Supply Scheme under Barasat Division, PHE Dte. ORD/000771/2022-2023 635/HSD 08/04/2022 15 SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. 4.83 4.83 0
736 Barasat Division Acceptance cum work order for Route Survey, Design Drawing & DPR Preparation for Augmentation of Hingalganj Zone - II Piped Water Supply Scheme under Barasat Division, PHE Dte. ORD/000772/2022-2023 636/HSD 08/04/2022 15 SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. 4.39 4.39 0
737 Barasat Division Formal work order for construction of 250 cum capacity 20 mtr. staging height R.C.C. Over Head Water Reservoir as per Departmental design, drawing and specification including bored pile & pile cap and laying of Rising main & distribution pipe line by DI & UPVC and providing FHTC for Augmentaion of Bamangachhi water supply scheme under Barasat Sub-Division, P.H.E. Dte. ORD/000772/2023-2024 2650/BD 01/09/2023 366 S.S.ENTERPRISE. (BAMANGACHI) 538.69 528.74 100
738 Barasat Division Acceptance cum work order for Sinking of 1 no. 300mm. x 200 mm. big dia 300 mtr deep Tube well by Direct Rotary Rig method at Pump House 1 using PVC pipe & strainer having 300 mm Dia 42 mtr. long Housing Pipe and 200mm Dia 30 mtr. long filter for Augmentation of Champapukuria Water Supply Scheme in Basirhat - II Block of Basirhat Sub- Division under Barasat Division, PHE Dte. ORD/000772/2024-2025 3261/BD 25/11/2024 30 NEW MA TARA ENTERPRISE. 21.59 0.00 0
739 Barasat Division Formal work order for laying of DI/UPVC distribution pipe line and Providing Functional House Hold Tap Connection (FHTC) for Augmentation of Bharatpur Water Supply Scheme under Bongaon Sub-Division, PHE Dte. ORD/000773/2022-2023 3470/BD 01/12/2022 90 ONKAR ENTERPRISE. 140.49 140.43 1
740 Barasat Division Formal work order for laying of DI/UPVC distribution pipe line and Providing Functional House Hold Tap Connection (FHTC) for Augmentation of Malidah Water Supply Scheme under Bongaon Sub-Division, PHE Dte. ORD/000774/2022-2023 3471/BD 01/12/2022 90 R.K.MANDAL & CO. 243.90 183.97 100
741 Barasat Division Formal work order for laying of DI/UPVC distribution pipe line and Providing Functional House Hold Tap Connection (FHTC) For Augmentation of Ghatpatila Zone-I Water Supply Scheme in Bagdah Block under Bongaon Sub-Division, PHE Dte. ORD/000775/2022-2023 3469/BD 01/12/2022 90 H.I.ENTERPRISE. 471.66 413.30 0
742 Barasat Division Acceptance cum work order for Sinking of Additional 2 nos. 300 mm. x 200 mm. dia. 360 mtr deep Tubewell by D.R. Rig method with PVC pipe & strainer having 300mm dia 48 mtr. long housing pipe & 200mm dia 30 mtr. long filter within Korakati and Monipur w/s scheme, Sandeshkhali-II block under Hasnabad Sub-Division, P.H.E. Dte. ORD/000775/2024-2025 3333/BD 28/11/2024 60 UTPAL CONSTRUCTION & CO. 63.34 0.00 0
743 Barasat Division Formal work order for Laying of DI/UPVC distribution pipeline and Providing FHTC (Functional Household Tap Connection ) for augmentation of Champapukuria water supply scheme in Basirhat-II block of North 24 Parganas Distruct under Barasat Division, PHE Dte. ORD/000776/2022-2023 3473/BD 01/12/2022 90 UTPAL CONSTRUCTION & CO. 211.02 210.11 92
744 Barasat Division Formal work order for Laying of DI / UPVC distribution pipe line and Providing FHTC (Functional Household Tap Connection) by Augmentation of Nalabara (Zone-I) Water Supply Scheme in Swarupnagar Block of North 24 Parganas District under Barasat Division, P.H.E. Dte. ORD/000776/2023-2024 2713/BD 05/09/2023 546 GARGO TRADERS 559.43 403.19 72
745 Barasat Division Formal work order for Providing Functional House Hold Tap Connection (FHTC) from existing and new proposed distribution system with in command area at Kurulia (Zone-I) Water Supply Scheme under Bongaon Sub-Division, PHE Dte.(Augmentation). ORD/000777/2022-2023 1243/BD 26/04/2022 90 M/S NANDY ENTERPRISE 470.60 317.22 100
746 Barasat Division Formal work order for laying of DI/UPVC distribution pipe line and Providing Functional House Hold Tap Connection (FHTC) For Augmentation of Sadiknagar Zone-II Water Supply Scheme in Basirhat-II Block of North 24 Parganas District under Barasat Division, PHE Dte. ORD/000778/2022-2023 3474/BD 01/12/2022 90 TIRUPATI ENTERPRISES 214.95 131.82 80
747 Barasat Division Acceptance cum work order for Sinking of 1(one) no. 300mm x 200 mm. dia. Replacement of Tube well 250 mtr deep by D.R. method with UPVC pipe & UPVC ribbed strainer for Augmentation of Ramnagar water supply scheme at Head Work Site under Bongaon Sub-Division P.H.E.Dte. ORD/000778/2023-2024 2685/BD 04/09/2023 30 SAHA CONSTRUCTION & CO 16.17 11.73 100
748 Barasat Division Formal work order for Laying of DI/UPVC distribution pipeline and Providing FHTC (Functional Household Tap Connection ) for augmentation of Mirjanagar water supply scheme in Basirhat-II block of North 24 Parganas District under Barasat Division, PHE Dte. ORD/000779/2022-2023 3476/BD 01/12/2022 90 SUPER SKILL. 288.66 287.73 90
749 Barasat Division Formal work order for "Laying of DI rising main, DI/UPVC distribution pipe line, Construction of 350 cum capacity 20 mtr. staging height R.C.C. Over Head Water Reservoir as per Departmental design, drawing and specification including bored pile & pile cap and providing Functional Household Tap Connection in connection with Augmentaion of Hasnabad water supply scheme, Hasnabad Block under Hasnabad Sub-Division, P.H.E. Dte. ORD/000779/2023-2024 2601/BD 28/08/2023 582 M/S S.S.ENTERPRISE. (SOUTH) 793.69 378.08 70
750 Barasat Division Formal work order for Laying of DI rising main, DI/UPVC distribution pipe line, Construction of 700 cum capacity 20 mtr. staging height R.C.C. Over Head Water Reservoir as per Departmental design, drawing and specification including bored pile & pile cap and providing Functional Household Tap Connection in connection with Augmentaion of Dakshin Bhebia water supply scheme (Zone-II), Hasnabad Block under Hasnabad Sub-Division, P.H.E. Dte. ORD/000780/2023-2024 2592/BD 28/08/2023 793 H.I.ENTERPRISE. 1,098.89 1,024.33 80
751 Barasat Division Formal work order for Laying of DI/UPVC distribution pipe line and Providing Functional House Hold Tap Connection (FHTC) for Augmentation of Gobindapur Water Supply Scheme under Bongaon Sub-Division, PHE Dte. ORD/000781/2022-2023 3488/BD 02/12/2022 90 M/S NIRMAN CONSTRUCTION. 341.88 326.42 99
752 Barasat Division Formal work order for Laying of DI rising main, DI/UPVC distribution pipe line, Construction of 600 cum capacity 20 mtr. staging height R.C.C. Over Head Water Reservoir as per Departmental design, drawing and specification including bored pile & pile cap and providing Functional Household Tap Connection in connection with Augmentaion of Dakshin Bhebia water supply scheme (Zone-I), Hasnabad Block under Hasnabad Sub-Division, P.H.E. Dte. ORD/000781/2023-2024 2593/BD 28/08/2023 1097 H.I.ENTERPRISE. 937.45 684.96 65
753 Barasat Division Formal work order for Laying of DI/UPVC distribution pipe line and Providing Functional House Hold Tap Connection (FHTC) for Augmentation of Diara Water Supply Scheme under Bongaon Sub-Division, PHE Dte. ORD/000782/2022-2023 3489/BD 02/12/2022 90 MONDAL & CO. (BASIRHAT). 380.98 355.91 100
754 Barasat Division Formal work order for construction of 600 cum capacity 20 mtr. staging height R.C.C. Over Head Water Reservoir as per Departmental design, drawing and specification including bored pile & pile cap and laying of Rising main & distribution pipe line by DI & UPVC and providing FHTC for Augmentaion of Swetpur (Zone-II) water supply scheme under Barasat Sub-Division, P.H.E. Dte. ORD/000782/2023-2024 2594/BD 28/08/2023 731 SINGHA ROY & CO. 523.50 87.90 8
755 Barasat Division Formal work order for Laying of DI/UPVC distribution pipe line and Providing Functional House Hold Tap Connection (FHTC) for Augmentation of Mathurapur Water Supply Scheme in Basirhat-II Block of North 24 Parganas District under Barasat Division, PHE Dte. ORD/000783/2022-2023 3490/BD 02/12/2022 90 M/S DATTA ENTERPRISE. 325.16 285.78 76
756 Barasat Division Formal work order for Laying of DI/UPVC distribution pipe line and Providing Functional House Hold Tap Connection (FHTC) for Augmentation of Chhayagharia (Zone-III) Water Supply Scheme under Bongaon Sub-Division, PHE Dte. ORD/000784/2022-2023 3491/BD 02/12/2022 90 M/S PROGATI ENTERPRISE. 296.33 296.19 100
757 Barasat Division Formal work order for Laying of DI rising main, DI/UPVC distribution pipe line, Construction of 600 cum capacity 20 mtr. staging height R.C.C. Over Head Water Reservoir as per Departmental design, drawing and specification including bored pile & pile cap and providing Functional Household Tap Connection in connection with Augmentaion of Bhabanipur water supply scheme (Zone-II), Hasnabad Block under Hasnabad Sub-Division, P.H.E. Dte. ORD/000784/2023-2024 2600/BD 28/08/2023 579 M/S S.S.ENTERPRISE. (SOUTH) 956.10 499.70 70
758 Barasat Division Acceptance cum work order for Laying of UPVC distribution main and Providing FHTC (Functional Household Tap Connection ) by augmentation for Dakshin Bagundi water supply scheme in Basirhat-I block under Barasat Division, PHE Dte. ORD/000785/2022-2023 3511/BD 02/12/2022 30 ROY CHOWDHURY CONSTRUCTION. 50.96 43.28 85
759 Barasat Division Hiring Diesel Luxury Car on daily basis for the office use of the Assistant Engineer, Basirhat Sub-Division P.H.E. Dte. (Period 01.07.2023 to 31.12.2023 for Six Month) ORD/000785/2023-2024 604/BHTSD 28/06/2023 184 DEB KUMAR DAS. 0.87 1.54 33
760 Barasat Division Formal work order for Laying of DI/UPVC distribution pipe line and Providing Functional House Hold Tap Connection (FHTC) for Augmentation of Patua Water Supply Scheme in Swarupnagar Block of North 24 Parganas District under Barasat Division, PHE Dte. ORD/000787/2022-2023 3549/BD 06/12/2022 1054 SUBHASH BOSE. 326.66 224.76 27
761 Barasat Division Formal work order for Laying of DI/UPVC distribution pipe line and Providing Functional House Hold Tap Connection (FHTC) for Augmentation of Chowberia Water Supply Scheme under Bongaon Sub-Division, PHE Dte. ORD/000788/2022-2023 3546/BD 06/12/2022 90 M/S B.K.ENTERPRISE. 279.32 227.89 1
762 Barasat Division Providing Functional Household Tap Connection (FHTC) in connection with Jal Jeevan Mission (JJM and JAL SWAPNA) under command area of Gopalpur Chandigarh Mouza (Part) within Humaipur Water Supply Scheme at Barasat II Block under Barasat Division, PHE Dte. Part-I Sl.No.4 ORD/000789/2020-2021 171/BSD 18/02/2021 14 ANJALI ENTERPRISE. 2.18 1.91 1
763 Barasat Division Formal work order for Laying of DI/UPVC distribution pipe line and providing Functional Household Tap Connection for Augmentation of Gotra water supply scheme in Basirhat-I Block under Barasat Division, P.H.E Dte. ORD/000789/2022-2023 3547/BD 06/12/2022 90 BALAJI UDDYOG 468.63 330.73 57
764 Barasat Division Formal work order for Laying of DI/UPVC distribution pipe line and providing Functional Household Tap Connection for Augmentation of Kachua Swarupnagar water supply scheme in Basirhat-II Block under Barasat Division, P.H.E Dte. ORD/000790/2022-2023 3548/BD 06/12/2022 90 EFFLUENT & WATERTREATMENT ENGINEERS (P) LTD. 395.76 390.22 65
765 Barasat Division Acceptance cum work order for Sinking of Additional 2 nos. 300 mm. x 200 mm. dia. 360 mtr deep Tubewell by D.R. Rig method with PVC pipe & strainer having 300mm dia 48 mtr. long housing pipe & 200mm dia 30 mtr. long filter within Sandeshkhali and Bouthakurani (Z-II) w/s scheme, Sandeshkhali-II block under Hasnabad Sub-Division, P.H.E. Dte. ORD/000791/2024-2025 3332/BD 28/11/2024 60 UTPAL CONSTRUCTION & CO. 63.30 0.00 0
766 Barasat Division Formal work order for construction of 500 cum capacity 20 mtr. staging height R.C.C. Over Head water Reservoir as per Departmental design, drawing and specification including bored pile & pile cap for Augmentaion of Chaital water supply scheme, Minakhan Block under Hasnabad Sub-Division, P.H.E. Dte. ORD/000792/2023-2024 2614/BD 29/08/2023 365 M/S B.K.ENTERPRISE. 203.43 120.47 75
767 Barasat Division Formal work order for Laying of DI/UPVC distribution pipe line and Providing Functional House Hold Tap Connection (FHTC) for Augmentation of Ashudi Water Supply Scheme under Bongaon Sub-Division, PHE Dte. ORD/000793/2022-2023 3550/BD 06/12/2022 90 AQUATHERM WATER TREATMENT PRIVATE LIMITED 156.77 99.89 0
768 Barasat Division Acceptance cum work order for Sinking of 1(one) no. 300mm x 200 mm. dia. Replacement of Tube well 250 mtr deep by D.R. method with UPVC pipe & UPVC ribbed strainer for Augmentation of Ramnagar water supply scheme at 2nd T/W Site under Bongaon Sub-Division P.H.E.Dte. ORD/000793/2023-2024 2684/BD 04/09/2023 30 SAHA CONSTRUCTION & CO 16.17 11.22 100
769 Barasat Division Acceptance cum work order for Sinking of Additional 1 no. 300 mm. x 200 mm. dia. 360 mtr deep Tube well by D.R. Rig method with PVC pipe & strainer having 300mm dia 48 mtr. long housing pipe & 200mm dia 30 mtr. long filter within Bhangatushkhali W/s Scheme, Sandeshkhali-II block under Hasnabad Sub-Division, P.H.E. Dte. ORD/000793/2024-2025 3311/BD 27/11/2024 30 SUBHAJIT SAHA 31.69 0.00 0
770 Barasat Division Acceptance cum work order for Sinking of 1(one) no. 300mm x 200 mm. dia. Replacement of Tube well 250 mtr deep by D.R. method with UPVC pipe & UPVC ribbed strainer for Augmentation of Chhaighoria (Zone-I) water supply scheme at Head Work Site under Bongaon Sub-Division P.H.E.Dte. ORD/000794/2023-2024 2683/BD 04/09/2023 30 DHELA BABA ENTERPRISE 16.17 14.45 100
771 Barasat Division Acceptance cum work order for Sinking of 1(one) no. 300mm x 200 mm. dia. Replacement of Tube well 250 mtr deep by D.R. method with UPVC pipe & UPVC ribbed strainer for Augmentation of Chauberia water supply scheme at 2nd T/W Site under Bongaon Sub-Division P.H.E.Dte. ORD/000795/2023-2024 2695/BD 04/09/2023 30 DHELA BABA ENTERPRISE 16.17 11.74 100
772 Barasat Division Acceptance cum work order for Sinking of 1(one) no. 300mm x 200 mm. dia. Replacement of Tube well 250 mtr deep by D.R. method with UPVC pipe & UPVC ribbed strainer for Augmentation of Diara water supply scheme at Head Work Site under Bongaon Sub-Division P.H.E.Dte. ORD/000796/2023-2024 2696/BD 04/09/2023 30 B.M.ENGINEERING. & CONSTRUCTION. 16.10 13.54 100
773 Barasat Division Acceptance cum work order for Sinking of Additional 1 no. 300 mm. x 200 mm. dia. 360 mtr deep Tubewell by D.R. Rig method with PVC pipe & strainer having 300mm dia 48 mtr. long housing pipe & 200mm dia 30 mtr. long filter within Jeliakhali Purbakhanda w/s scheme, Sandeshkhali-II block under Hasnabad Sub-Division, P.H.E. Dte. ORD/000796/2024-2025 3314/BD 27/11/2024 30 JOY GURU ENTERPRISE 31.69 0.00 0
774 Barasat Division Acceptance cum work order for Sinking of 1(one) no. 300mm x 200 mm. dia. Replacement of Tube well 250 mtr deep by D.R. method with UPVC pipe & UPVC ribbed strainer for Augmentation of Shimulpur water supply scheme at Head Work Site under Bongaon Sub-Division P.H.E.Dte. ORD/000797/2023-2024 2697/BD 04/09/2023 30 NADIA TUBEWELLS 16.16 13.93 100
775 Barasat Division Acceptance cum work order for Sinking of Additional 2 nos. 300 mm. x 200 mm. dia. 360 mtr deep Tubewell by D.R. Rig method with PVC pipe & strainer having 300mm dia 48 mtr. long housing pipe & 200mm dia 30 mtr. long filter within Baunia Abad w/s scheme, Sandeshkhali-I block under Hasnabad Sub-Division, P.H.E. Dte. ORD/000797/2024-2025 3303/BD 27/11/2024 60 JOY GURU ENTERPRISE 63.39 0.00 0
776 Barasat Division Formal work order for construction of 5 nos. different capacity OHR, Land development, Construction of Office cum Guard room, Switch cum Chlorine Room, Boundary wall, Surface drain and related allied works at different Zonal Head work site including Laying Distribution System and FHTC of surface based water supply scheme for arsenic affected areas of Habra-Gaighata & adjoining mouzas in the district North 24 Parganas under Barasat Division, P.H.E. Dte. ORD/000798/2023-2024 2714/BD 05/09/2023 1095 S & P ENTERPRISE 5,112.52 239.90 40
777 Barasat Division Acceptance cum work order for Sinking of 1(one) no. 300mm x 200 mm. dia. Replacement of Tube well 250 mtr deep by D.R. method with UPVC pipe & UPVC ribbed strainer for Augmentation of Ichhapur water supply scheme at 2nd T/W Site under Bongaon Sub-Division P.H.E.Dte. ORD/000799/2023-2024 2698/BD 04/09/2023 30 NADIA TUBEWELLS 16.16 13.10 100
778 Barasat Division Acceptance cum work order for Providing new FHTC (Functional Household Tap Connection) by Augmentation and relaying of rising main, distribution UPVC pipe line and repairing of existing FHTC connection which damaged due to construction of drain by local Panchayet from Pump house I to Pump house II of Dakshin Debipur pwss under Basirhat Sub-Division, under Barasat Division, PHE Dte. ORD/000800/2024-2025 3294/BD 26/11/2024 210 ROHAN MONDAL. 57.65 0.00 80
779 Barasat Division Acceptance cum work order for Supply of sluice valve i/c Construction of Sluice valve chamber and other allied works at different location within Hingalganj w/s scheme (Zone-II), Hingalganj Block under Hasnabad Sub- Division P.H.E. Dte. ORD/000804/2021-2022 1858/HSD. 17/11/2021 15 M/S NIRMAN CONSTRUCTION. 2.96 2.96 1
780 Barasat Division Acceptance cum work order for Hiring Diesel Luxury Car on Daily basis (for 6 months from 01.10.2022 to 31.03.2023) for the office use of the Executive Engineer, Barasat Division, PHE Dte. ORD/000805/2022-2023 2826/BD 29/09/2022 181 MADHAB CHANDRA DAS 0.89 1.56 0
781 Barasat Division Acceptance cum work order for Laying of UPVC distribution main and Providing FHTC (Functional Household Tap Connection ) by augmentation for Joypur Gopmahal water supply scheme in Basirhat-II block under Barasat Division, PHE Dte. ORD/000812/2022-2023 3585/BD 08/12/2022 744 UNIFIED ENGINEERS' CO-OPERATIVE SOCIETYLTD. 37.54 18.81 100
782 Barasat Division Acceptance cum work order for Sinking of Additional 1 no. 300 mm. x 200 mm. dia. 360 mtr deep Tubewell by D.R. Rig method with PVC pipe & strainer having 300mm dia 48 mtr. long housing pipe & 200mm dia 30 mtr. long filter within Tushkhali w/s scheme, Sandeshkhali-II block under Hasnabad Sub-Division, P.H.E. Dte. ORD/000812/2024-2025 3334/BD 28/11/2024 30 UTPAL CONSTRUCTION & CO. 31.69 0.00 0
783 Barasat Division Acceptance cum work order for Laying of UPVC distribution main and Providing FHTC (Functional Household Tap Connection ) by augmentation for Kulia water supply scheme in Baduria block under Barasat Division, PHE Dte. ORD/000813/2022-2023 3586/BD 08/12/2022 30 PREMANANDA ROY BISWAS. 73.89 72.44 100
784 Barasat Division Acceptance cum work order for Laying of UPVC distribution main and Providing FHTC (Functional Household Tap Connection ) by augmentation for Rajnagar water supply scheme in Basirhat-II block under Barasat Division, PHE Dte. ORD/000814/2022-2023 3587/BD 08/12/2022 30 B.S.ENTERPRISE. (BASIRHAT) 62.54 62.40 100
785 Barasat Division Acceptance cum work order for Laying of UPVC distribution main and Providing FHTC (Functional Household Tap Connection ) by augmentation for Nalkora water supply scheme in Basirhat-I block under Barasat Division, PHE Dte. ORD/000815/2022-2023 3588/BD 08/12/2022 30 SARKAR ENTERPRISE & CO. 69.53 62.47 99
786 Barasat Division Formal Work Order for Providing Functional Household Tap Connection (FHTC) in connection with Jal Jeevan Mission (JJM and Jal Swapna) under command area of Maslandapur Water Supply Scheme(Zone-I) at Habra-I Block within the jurisdiction of Habra Sub-Division, under Barasat Division, PHE Dte. (Phase-I). ORD/000816/2021-2022 2436/BD 13/12/2021 90 SUPRITI ENTERPRISE. 113.29 109.24 1
787 Barasat Division Formal Work Order for Providing Functional Household Tap Connection (FHTC) from existing and new proposed distribution system within the command area of Arsula Water Supply Scheme at Baduria Block under Barasat Division, PHE Dte.(Phase-I) ORD/000817/2021-2022 2437/BD 13/12/2021 90 M/S S.S.ENTERPRISE. (SOUTH) 194.62 160.59 1
788 Barasat Division Acceptance cum work order for Sinking of 1(one) no. 300mm x 200 mm. dia. Tube well 250 mtr deep by D.R. method with UPVC pipe & UPVC ribbed strainer for Augmentation at Kurulia (Zone-I) water supply scheme (2nd T/W site) under Bongaon Sub-Division P.H.E.Dte. ORD/000817/2022-2023 3589/BD 08/12/2022 15 M/S SUKANTA ENTERPRISE. 15.04 14.07 0
789 Barasat Division Acceptance cum work order for Sinking of 1(one) no. 300mm x 200 mm. dia. Tube well 250 mtr deep by D.R. method with UPVC pipe & UPVC ribbed strainer for Augmentation at Kurulia (Zone-II) water supply scheme (2nd T/W site) under Bongaon Sub-Division P.H.E.Dte. ORD/000818/2022-2023 3590/BD 08/12/2022 15 M/S SUKANTA ENTERPRISE. 15.04 11.70 100
790 Barasat Division Acceptance cum work order for Sinking of 1(one) no. 300mm x 200 mm. dia. Tube well 250 mtr deep by D.R. method with UPVC pipe & UPVC ribbed strainer for Augmentation at Panchita water supply scheme (2nd T/W site) under Bongaon Sub-Division P.H.E.Dte. ORD/000819/2022-2023 3591/BD 08/12/2022 15 SAHA CONSTRUCTION & CO 15.12 13.73 0
791 Barasat Division Formal work order for Laying of DI/UPVC Distribution System pipeline and Providing FHTC (Functional Household Tap Connection ) for augmentation of Sankarpur water supply scheme in Basirhat-I block under Barasat Division, PHE Dte. ORD/000820/2022-2023 3602/BD 09/12/2022 923 EFFLUENT & WATERTREATMENT ENGINEERS (P) LTD. 459.43 346.92 76
792 Barasat Division Formal Work Order for Providing Functional Household Tap Connection (FHTC) from existing and new proposed distribution system within the command area of Gobindapur Water Supply Scheme at Baduria Block, Dist- North 24 Parganas under Barasat Division, PHE Dte.(Phase-I). ORD/000822/2021-2022 2438/BD 13/12/2021 90 UTPAL CONSTRUCTION & CO. 224.17 222.04 1
793 Barasat Division Formal work order for Laying of DI/UPVC distribution pipe line and Providing Functional House Hold Tap Connection (FHTC) for Augmentation of Chhayagharia(Zone-II) Water Supply Scheme under Bongaon Sub-Division, PHE Dte. ORD/000822/2022-2023 3601/BD 09/12/2022 90 M/S B.N ENTERPRISE 152.03 151.24 100
794 Barasat Division Formal Work Order for Providing Functional Household Tap Connection (FHTC) from existing and new proposed distribution system within the command area under Magurali Water Supply Scheme at Baduria Block, District- North 24 Parganas under Barasat Division, PHE Dte.(Phase-I). ORD/000823/2021-2022 2439/BD 13/12/2021 90 UTPAL CONSTRUCTION & CO. 232.79 205.13 1
795 Barasat Division Formal work order for Laying of DI/UPVC distribution pipe line and providing Functional Household Tap Connection for Augmentation of Eojnagar water supply scheme in Basirhat-II Block under Barasat Division, P.H.E Dte. ORD/000823/2022-2023 3603/BD 09/12/2022 990 KINGS & CO. 361.31 306.28 74
796 Barasat Division Formal work order for Laying of DI/UPVC distribution pipe line and Providing Functional House Hold Tap Connection (FHTC) for Augmentation of Chhayagharia(Zone-I) Water Supply Scheme under Bongaon Sub-Division, PHE Dte. ORD/000824/2022-2023 3604/BD 09/12/2022 90 MONDAL ENTERPRISE. (BARASAT) 462.80 461.39 1
797 Barasat Division Formal work order for Laying of DI/UPVC distribution pipe line and providing Functional Household Tap Connection for Augmentation of Sadik Nagar Zone-I water supply scheme in Basirhat-II Block under Barasat Division, P.H.E Dte. ORD/000825/2022-2023 3605/BD 09/12/2022 90 PUSPA ENTERPRISE. 406.99 395.20 100
798 Barasat Division Acceptance cum work order for Sinking of 1(one) no. 300mm x 200 mm. dia. Tube well 250 mtr deep by D.R. method with UPVC pipe & UPVC ribbed strainer for Augmentation at Gangrapota water supply scheme (2nd T/W site) under Bongaon Sub-Division P.H.E.Dte. ORD/000827/2022-2023 3621/BD 12/12/2022 15 DHELA BABA ENTERPRISE 15.12 13.34 0
799 Barasat Division Acceptance cum work order for Sinking of 1(one) no. 300mm x 200 mm. dia. Tube well 250 mtr deep by D.R. method with UPVC pipe & UPVC ribbed strainer for Augmentation at Sindrani (Zone-I) water supply scheme (Head Works site) under Bongaon Sub-Division P.H.E.Dte. ORD/000828/2022-2023 3622/BD 12/12/2022 15 NADIA TUBEWELLS 15.06 12.32 0
800 Barasat Division Acceptance cum wok order for Sinking of 1(one) no. 300mm x 200 mm. dia. Tube well 250 mtr deep by D.R. method with UPVC pipe & UPVC ribbed strainer for Augmentation at Sindrani (Zone-II) water supply scheme (2nd T/W site) under Bongaon Sub-Division P.H.E.Dte. ORD/000829/2022-2023 3623/BD 12/12/2022 15 NADIA TUBEWELLS 15.07 12.82 0
801 Barasat Division Acceptance cum Work Order for Providing Functional Household Tap Connection(FHTC) from existing and new proposed distribution system within the command area of Nityanandakati Balti Water Supply Scheme at Swarupnagar Block under Barasat Division, PHE Dte. (Phase I) ORD/000830/2021-2022 2460/BD 15/12/2021 45 SHIBU BISWAS. 66.16 65.92 1
802 Barasat Division Acceptance cum work order for Sinking of 250mm. X 150mm.dia. 300.00mtr. deep tubewell by direct rotary rig method, having 250mm.dia. 30.0mtr. long PVC housing pipe & 150mm.dia. 30.0mtr. long pre-packed resin bonded filter at Head Work Site of Donnagar Water Supply Scheme under Barasat Sub-Division, P.H.E. Dte. ORD/000830/2022-2023 523/BD 20/02/2023 15 M/S SUKANTA ENTERPRISE. 14.69 12.12 32
803 Barasat Division Acceptance cum Work Order for Providing Functional Household Tap Connection(FHTC) from existing and new proposed distribution system within the command area of Zafarpur Water Supply Scheme at Basirhat - II Block under Barasat Division, PHE Dte. (Phase - I) ORD/000831/2021-2022 2461/BD 15/12/2021 45 SHIBU BISWAS. 81.63 81.47 1
804 Barasat Division Formal work order for Laying of DI/UPVC distribution pipe line and Providing Functional House Hold Tap Connection (FHTC) for Augmentation of Chandpara Water Supply Scheme under Bongaon Sub-Division, PHE Dte. ORD/000831/2022-2023 3629/BD 12/12/2022 1170 MAHAVIR PUMPS MANUFACTURING PVT.LTD. 525.18 421.34 92
805 Barasat Division Formal work order for Laying of DI/UPVC distribution pipe line and Providing Functional House Hold Tap Connection (FHTC) for Augmentation of Kamalabas Water Supply Scheme under Bongaon Sub-Division, PHE Dte. ORD/000836/2022-2023 3630/BD 12/12/2022 90 BANERJEE CONSTRUCTION. ( BARASAT) 181.45 131.10 0
806 Barasat Division Acceptance cum work order for Providing Functional House Hold Tap Connection (FHTC) from existing distribution system at Bergum Water Supply Scheme within the jurisdiction of Habra Sub-Division under Barasat Division, P.H.E. Dte.( For balance work of Retrofitting). ORD/000837/2022-2023 3582/ BD 08/12/2022 30 ANKUSH CONSTRUCTION & CO. 16.19 15.18 1
807 Barasat Division Acceptance cum work order for Providing Functional House Hold Tap Connection (FHTC) from existing distribution system at Talsa & Adj. Mouzas Water Supply Scheme within the jurisdiction of Habra Sub-Division under Barasat Division, P.H.E. Dte.( For balance work of Retrofitting). ORD/000838/2022-2023 3583/ BD 08/12/2022 30 TRISHA ENTERPRISE & CO. 42.66 42.65 1
808 Barasat Division Formal work order for Laying of DI/UPVC distribution pipe line and providing Functional Household Tap Connection for Augmentation of Pipha water supply scheme in Basirhat-I Block under Barasat Division, P.H.E Dte. ORD/000842/2022-2023 3631/BD 12/12/2022 787 SANDIP BISWAS 318.65 281.92 95
809 Barasat Division Acceptance cum work order for Protection works in different places for protection of different dia. DI/UPVC rising/distribution pipeline by UC bullah/Bamboo pile for Augmention of Durgamandop w/s scheme, Sandeshkhali-II block under Hasnabad Sub-Division, P.H.E. Dte. ORD/000843/2023-2024 2652/BD 01/09/2023 30 MONDAL & CO. (BASIRHAT). 56.83 56.73 84
810 Barasat Division Acceptance cum work order for Protection works in different places for protection of different dia. DI/UPVC rising/distribution pipeline by UC bullah/Bamboo pile for Augmention of Korakati w/s scheme, Sandeshkhali-II block under Hasnabad Sub-Division, P.H.E. Dte. ORD/000844/2023-2024 2680/BD 04/09/2023 30 ANKIT CONSTRUCTION 66.88 66.57 82
811 Barasat Division Formal work order for laying of DI/UPVC distribution pipe line and Providing Functional House Hold Tap Connection (FHTC) For Augmentation of Dhopaberia-Ganrakupia Water Supply Scheme in Basirhat-II Block of North 24 Parganas District under Barasat Division, PHE Dte. ORD/000846/2022-2023 3475/ BD 01/12/2022 90 DIVINE 311.55 303.00 93
812 Barasat Division Acceptance cum work order for Protection works in different places for protection of different dia. DI/UPVC rising/distribution pipeline by UC bullah/Bamboo pile for Augmention of Monipur w/s scheme, Sandeshkhali-II block under Hasnabad Sub-Division, P.H.E. Dte. ORD/000846/2023-2024 2654/BD 01/09/2023 30 M/S K.B.ENTERPRISE. 27.43 27.39 85
813 Barasat Division Acceptance cum work order for Protection works in different places for protection of different dia. DI/UPVC rising/distribution pipeline by UC bullah/Bamboo pile for Augmention of Malancha w/s scheme (Z-II), Minakhan block under Hasnabad Sub-Division, P.H.E. Dte. ORD/000847/2023-2024 2655/BD 01/09/2023 30 SRI KRISHNA CO-OP-LABOUR CONTRACT AND CONST SOC LTD. 50.24 50.08 37
814 Barasat Division Survey, Design, Drawing & DPR preparation for new PWSS at Puratan Bongaon water supply scheme in the Bongaon Block under Bongaon Sub-Division, under Barasat Division P.H.E.Dte. (Part-A) ORD/000848/2022-2023 344/Bon 07/07/2022 21 SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. 4.84 4.84 1
815 Barasat Division Acceptance cum work order for Protection works in different places for protection of different dia DI/UPVC rising/distribution pipe line by UC bullah/Bamboo pile for Augmentation of Khulna Bhandarkhali Zone-II w/s scheme, Sandeshkhali-II block under Hasnabad Sub- Division P.H.E. Dte. ORD/000848/2023-2024 2656/BD 01/09/2023 30 M/S DATTA ENTERPRISE. 58.87 58.07 85
816 Barasat Division Survey, Design, Drawing & DPR preparation for new PWSS at Puratan Bongaon water supply scheme in the Bongaon Block under Bongaon Sub-Division, under Barasat Division P.H.E.Dte. (Part-B) ORD/000849/2022-2023 345/Bon 07/07/2022 21 SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. 2.16 2.16 1
817 Barasat Division Acceptance cum work order for Protection works in different places for protection of different dia DI/UPVC rising/distribution pipe line by UC bullah/Bamboo pile for Augmentation of Bouthakurani w/s scheme, Sandeshkhali-II block under Hasnabad Sub- Division P.H.E. Dte. ORD/000849/2023-2024 2657/BD 01/09/2023 30 R.K.MANDAL & CO. 80.57 80.45 81
818 Barasat Division Acceptance cum work order for Providing Functional Household Tap Connection (FHTC) to the uncovered household as well as convert the mouzas into Swajal Gram including laying of UPVC pipe under Augmentation work at Chhaygharia (Zone-III) W/S Scheme Bongaon block within the jurisdiction of Bongaon Sub-Division under Barasat Division, P.H.E. Dte. (Part-A). ORD/000849/2024-2025 3385/BD 03/12/2024 150 VAI ENTERPRISE. 12.02 0.00 100
819 Barasat Division Survey, Design, Drawing & DPR preparation for new PWSS at Paschim Huda water supply scheme in the Bongaon Block under Bongaon Sub-Division, under Barasat Division, P.H.E.Dte. (Part-A) ORD/000850/2022-2023 346/Bon 07/07/2022 21 SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. 4.84 4.84 1
820 Barasat Division Acceptance cum work order for Protection work for newly laid different dia. UPVC/DI distribution pipeline at different places in Daudpur Mouza of Daudpur w/s scheme, Sandeshkhali-II block under Hasnabad Sub-Division P.H.E. Dte. ORD/000850/2023-2024 2658/BD 01/09/2023 30 M/S PROGATI ENTERPRISE. 34.09 33.95 100
821 Barasat Division Survey, Design, Drawing & DPR preparation for new PWSS at Paschim Huda water supply scheme in the Bongaon Block under Bongaon Sub-Division, under Barasat Division P.H.E. Dte. (Part-B) ORD/000851/2022-2023 347/Bon 07/07/2022 21 SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. 0.39 0.39 1
822 Barasat Division Formal work order for Construction of switch room cum chlorine room with sanitary & water supply arrangement including plinth protection at PH No.-1 (Size-5.40x3.60 mtr.) & PH No-2 & 3 (Size-3.60x3.00 mtr.), Laying of DI rising main, DI/UPVC distribution pipe line, Providing Functional Household Tap Connection, Protection works for different dia. UPVC/DI distribution pipeline by UC bullah/Bamboo pile at different places, Construction of 300 cum capacity 20 mtr. staging height R.C.C. Over Head Water Reservoir as per Departmental design, drawing and specification including bored pile & pile cap for Atpukur W/S Scheme (Zone-I), Minakhan Block under Hasnabad Sub-Division, P.H.E. Dte. ORD/000851/2023-2024 2616/BD 29/08/2023 1096 M/S PROGATI ENTERPRISE. 461.22 166.52 37
823 Barasat Division Work Order for Hiring of 1(one) number vehicle of Category Motor Cab/Maruti Omni(standard)(Non Air-Conditioned)/LPG/CNG Engine including Driver for performing the inspection works and official duties for the office of the Assistant Engineer, Barrackpore Sub-Division, P.H.E. Dte. at Barrackpore, Kolkata-700122, District- North 24Pgns, W.B.(period from 01.10.2024 to 31.03.2025) ORD/000851/2024-2025 528/BKP 30/09/2024 182 GOPAL SINGHA. 0.86 2.06 0
824 Barasat Division Survey, Design, Drawing & DPR preparation for new PWSS at Garibpur water supply scheme in the Bongaon Block under Bongaon Sub-Division, under Barasat Division P.H.E. Dte. ORD/000852/2022-2023 348/Bon 07/07/2022 21 SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. 4.45 4.45 1
825 Barasat Division Formal work order for Laying of DI rising main, DI/UPVC distribution pipe line, construction of 400cum capacity 20mtr staging height R.C.C Over head Reservoir as per Dept. design, drawing & specification including bored pile with pile cap and providing Functional Household Tap connection in connection with Augmentation of Bhabanipur Water Supply Scheme(Zone-I), Hasnabad Block under Hasnabad Sub-Division, PHE Dte. under Barasat Division PHE Dte. ORD/000852/2023-2024 2651/BD 01/09/2023 366 SUPRITI ENTERPRISE. 867.51 216.30 45
826 Barasat Division Acceptance cum work order for Dismantling & Re-construction of boundary wall for movement of rig & other allied machineries for sinking of big dia TW at PH no- 2 in connection with Augmentation of Korakati w/s scheme, Sandeshkhali-II block under Hasnabad Sub-Division P.H.E. Dte. ORD/000854/2023-2024 1041/HSD 31/08/2023 10 ANKUSH CONSTRUCTION & CO. 0.90 0.90 100
827 Barasat Division Acceptance cum work order for Dismantling & Re-construction of boundary wall for movement of rig & other allied machineries for sinking of big dia TW at PH no- 1 in connection with Augmentation of Korakati w/s scheme, Sandeshkhali-II block under Hasnabad Sub-Division P.H.E. Dte. ORD/000855/2023-2024 1042/HSD 31/08/2023 10 ANKUSH CONSTRUCTION & CO. 0.90 0.90 100
828 Barasat Division Acceptance cum work order for Dismantling & Re-construction of boundary wall for movement of rig & other allied machineries for sinking of big dia TW at PH no- 1 in connection with Augmentation of Korakati w/s scheme, Sandeshkhali-II block under Hasnabad Sub-Division P.H.E. Dte. ORD/000856/2023-2024 1042-HSD. 31/08/2023 10 ANKUSH CONSTRUCTION & CO. 0.90 0.00 0
829 Barasat Division Acceptance cum work order for Dismantling & Re-construction of boundary wall for movement of rig & other allied machineries for sinking of big dia TW at PH no- 2 in connection with Augmentation of Durgamandop w/s scheme, Sandeshkhali-II block under Hasnabad Sub-Division P.H.E. Dte. ORD/000857/2023-2024 1043/HSD 31/08/2023 10 ANKUSH CONSTRUCTION & CO. 0.90 0.90 100
830 Barasat Division Acceptance cum work order for Dismantling & Re-construction of boundary wall for movement of rig & other allied machineries for sinking of big dia TW at PH no- 1 in connection with Augmentation of Durgamandop w/s scheme, Sandeshkhali-II block under Hasnabad Sub-Division P.H.E. Dte. ORD/000858/2023-2024 1044/HSD 31/08/2023 10 ANKUSH CONSTRUCTION & CO. 0.93 0.93 100
831 Barasat Division Acceptance cum work order for Protection work for protection of 2nd pump house at canal side by UC bullah pilling within Nityaberia w/s scheme, Sandeshkhali-I block under Hasnabad Sub- Division P.H.E. Dte ORD/000860/2023-2024 1046/HSD 31/08/2023 10 BABUSONA CONSTRUCTION. 0.95 0.95 100
832 Barasat Division Acceptance cum work order for Emergent restoration of concrete road for damage portion at different places due to laying of new DI/UPVC pipe line within Hingalganj w/s scheme (Zone-II), Hingalganj block under Hasnabad Sub-Division P.H.E. Dte. ORD/000863/2022-2023 622/HSD 07/04/2022 15 M/S NIRMAN CONSTRUCTION. 2.34 2.34 1
833 Barasat Division Acceptance cum work order for Sinking of 1 nos. 300 mm. x 200 mm. dia. 360 mtr deep Tubewell by D.R. Rig method at with PVC pipe & strainer having 300mm dia 48 mtr. long housing pipe & 200mm dia 30 mtr. long filter at Joygopalpur tail end within Tushkhali w/s scheme, Sandeshkhali-II block under Hasnabad Sub-Division, P.H.E. Dte. ORD/000863/2024-2025 3378/BD 02/12/2024 30 CHANCHAL ENTERPRISE & CO. 31.47 0.00 0
834 Barasat Division Formal Work Order for Providing Functional Household Tap Connection (FHTC) in connection with Jal Jeevan Mission (JJM and Jal Swapna) under command area of Bergum Water Supply Scheme at Habra-I Block within the jurisdiction of Habra Sub-Division, under Barasat Division, PHE Dte. (Phase-I). ORD/000864/2021-2022 2484/BD 17/12/2021 1890 UNICON INDIA. 163.67 123.70 100
835 Barasat Division Formal work order for Laying of DI/UPVC distribution pipe line and Providing Functional House Hold Tap Connection (FHTC) for Augmentation of Chikanpara Water Supply Scheme under Bongaon Sub-Division, PHE Dte. ORD/000864/2022-2023 3762/BD 20/12/2022 90 SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. 481.61 481.36 100
836 Barasat Division Acceptance cum work order for Providing Functional tap connection at Rameswarpur Union Adarsha Bidyalaya at Rameswarpur in connection with augmentation of Hasnabad w/s scheme, Hasnabad block under Hasnabad Sub- Division P.H.E. Dte. ORD/000864/2023-2024 1050/HSD 01/09/2023 10 SARKAR ENTERPRISE 0.60 0.00 0
837 Barasat Division Formal work order for Laying of DI/UPVC distribution pipe line and providing Functional Household Tap Connection for Augmentation of Jafarpur water supply scheme in Basirhat-II Block under Barasat Division, P.H.E Dte. ORD/000865/2022-2023 3763/BD 20/12/2022 90 H.I.ENTERPRISE. 438.55 438.38 82
838 Barasat Division Acceptance cum work order for Providing Functional tap connection at Paschim Monipur FP School, East Monipur Khargeswar Adibasi FP School within the command area of Monipur w/s scheme, Sandeshkhali-II block under Hasnabad Sub- Division P.H.E. Dte. ORD/000865/2023-2024 1051/HSD 31/08/2023 7 RAJPATH ENGINEERS-CO-OPERATIVE SOCIETY LTD. 0.48 0.00 0
839 Barasat Division Formal work order for Laying of DI/UPVC distribution pipe line and Providing Functional House Hold Tap Connection (FHTC) for Augmentation of Kaniara Water Supply Scheme, Bagdah Block under Bongaon Sub-Division, PHE Dte. ORD/000866/2022-2023 3764/BD 20/12/2022 90 SUPER SKILL. 341.46 338.45 100
840 Barasat Division Acceptance cum work order for Providing Functional tap connection at Dhulia Jhupkhali FP School, Dhulia Jhupkhali Jr. High School & Jhupkhali FP School within the command area of Jhupkhali w/s scheme, Sandeshkhali-II block under Hasnabad Sub- Division P.H.E. Dte. ORD/000866/2023-2024 1052/HSD 31/08/2023 7 M/S RAJPATH CONSTRUCTION. 0.53 0.53 100
841 Barasat Division Formal work order for Laying of DI/UPVC distribution pipe line and Providing Functional House Hold Tap Connection (FHTC) for Augmentation of Ichhapur Water Supply Scheme under Bongaon Sub-Division, PHE Dte. ORD/000867/2022-2023 3768/BD 20/12/2022 90 BALAJI UDDYOG 468.29 467.86 100
842 Barasat Division Acceptance cum work order for Providing Functional tap connection at Dk Durgamandop FP School, DTD Sahid Smriti Bidyalaya & Durgamandop Sardar para High School within the command area of Durgamandop w/s scheme, Sandeshkhali-II block under Hasnabad Sub- Division P.H.E. Dte. ORD/000867/2023-2024 1053/HSD 31/08/2023 7 M/S RAJPATH CONSTRUCTION. 0.69 0.00 0
843 Barasat Division Acceptance cum work order for Providing Functional tap connection at Radharani High School at Sandeshkhali in connection with augmentation of Sandeshkhali w/s scheme, Sandeshkhali-II block under Hasnabad Sub- Division P.H.E. Dte. ORD/000868/2023-2024 1054/HSD 31/08/2023 7 M/S RAJPATH CONSTRUCTION. 0.90 0.00 0
844 Barasat Division Acceptance cum work order for Emergent restoration of existing FHTC along with pipe line in connection with retrofitting work at different places within laukhali mouza due to erosion of soil for heavy rain fall during monsoon season within Daudpur w/s scheme, Sandeshkhali-II block under Hasnasbad Sub-Division, P.H.E.Dte. ORD/000869/2023-2024 1055/HSD 31/08/2023 10 ABDUL ALIM MONDAL. 0.97 0.86 100
845 Barasat Division Acceptance cum work order for Providing Functional tap connection at Sukhdoani (SPL) FP School, Dk. Sukhdoani FP School & Sukhdoani Dwarikanath FP School within the command area of Sukhdoani w/s scheme, Sandeshkhali-II block under Hasnabad Sub- Division P.H.E. Dte. ORD/000870/2023-2024 1056/HSD 31/08/2023 7 RAJPATH ENGINEERS-CO-OPERATIVE SOCIETY LTD. 0.60 0.60 100
846 Barasat Division Acceptance cum work order for Emergent restoration of existing FHTC along with pipe line in connection with retrofitting work at different places within Ghatihara mouza due to erosion of soil for heavy rain fall during monsoon season within Kalinagar w/s scheme (Z-II), Sandeshkhali-I block under Hasnasbad Sub-Division, P.H.E.Dte. ORD/000871/2023-2024 1057/HSD 31/08/2023 10 M/S RAJPATH CONSTRUCTION. 0.98 0.98 100
847 Barasat Division Acceptance cum work order for Emergent restoration of existing FHTC along with pipe line in connection with retrofitting work at different places within Putimari mouza due to erosion of soil for heavy rain fall during monsoon season within Kalinagar w/s scheme (Z-II), Sandeshkhali-I block under Hasnasbad Sub-Division, P.H.E.Dte. ORD/000872/2023-2024 1058/HSD 31/08/2023 10 M/S RAJPATH CONSTRUCTION. 0.95 0.94 100
848 Barasat Division Acceptance cum work order for Emergent restoration of existing FHTC along with pipe line in connection with retrofitting work at different places within Gazalia mouza due to erosion of soil for heavy rain fall during monsoon season within Kalinagar w/s scheme (Z-II), Sandeshkhali-I block under Hasnasbad Sub-Division, P.H.E.Dte. ORD/000873/2023-2024 1059/HSD 31/08/2023 10 M/S RAJPATH CONSTRUCTION. 0.95 0.95 100
849 Barasat Division Acceptance cum work order for Emergent restoration of existing FHTC along with pipe line in connection with retrofitting work at different places within Ghoshpur mouza due to erosion of soil for heavy rain fall during monsoon season within Kalinagar w/s scheme (Z-I), Sandeshkhali-I block under Hasnasbad Sub-Division, P.H.E.Dte. ORD/000874/2023-2024 1060/HSD 31/08/2023 10 M/S RAJPATH CONSTRUCTION. 0.93 0.93 100
850 Barasat Division Acceptance cum work order for Emergent restoration of existing FHTC along with pipe line in connection with retrofitting work at different places within Roypur mouza due to erosion of soil for heavy rain fall during monsoon season within Kalinagar w/s scheme (Z-I), Sandeshkhali-I block under Hasnasbad Sub-Division, P.H.E.Dte. ORD/000875/2023-2024 1061/HSD 31/08/2023 10 M/S RAJPATH CONSTRUCTION. 0.96 0.96 100
851 Barasat Division Acceptance cum work order for Emergent restoration of existing FHTC along with pipe line in connection with retrofitting work at different places within Kalinagar mouza due to erosion of soil for heavy rain fall during monsoon season within Kalinagar w/s scheme (Z-I), Sandeshkhali-I block under Hasnasbad Sub-Division, P.H.E.Dte. ORD/000876/2023-2024 1063/HSD 31/08/2023 10 M/S RAJPATH CONSTRUCTION. 0.97 0.97 100
852 Barasat Division Acceptance cum work order for Protection works in different places for protection of different dia. DI/UPVC rising/distribution pipeline by UC bullah/Bamboo pile in Laukhali and Jhupkhali w/s scheme, Sandeshkhali-I & II block respectively under Hasnabad Sub-Division P.H.E. Dte. ORD/000879/2023-2024 2681/BD 04/09/2023 30 SURYA ENTERPRISE. 67.91 67.40 99
853 Barasat Division Acceptance cum work order for Strengthening of existing concrete road for movement of rig machineries for sinking of big dia Tube well at PH No-1 within Bargan Gopalpur w/s scheme, Minakhan block under Hasnabad Sub- Division P.H.E. Dte. ORD/000880/2023-2024 2715/BD 05/09/2023 10 PRITAM MUKHOPADHYAY. 8.46 8.45 100
854 Barasat Division Acceptance cum work order for Construction of 150 cum. capacity 20 mtr. staging height R.C.C. Over Head Water Reservoir as per Departmental design, drawing and specification including bored pile, pile cap & Soil Investigation within command area for Augmentation of Bharatpur Water Supply Scheme under Bongaon Sub-Division, PHE Dte. ORD/000884/2023-2024 2793/BD 12/09/2023 730 B.M.ENGINEERING. & CONSTRUCTION. 91.92 44.42 60
855 Barasat Division Acceptance cum work order for Sinking of 1(one) no. 300mm x 200 mm. dia. Replacement of Tube well 250 mtr deep by D.R. method with UPVC pipe & UPVC ribbed strainer for Augmentation of Chandpara water supply scheme at 2nd T/W Site under Bongaon Sub-Division P.H.E.Dte ORD/000885/2023-2024 2699/BD 04/09/2023 30 NADIA TUBEWELLS 16.16 10.60 100
856 Barasat Division Acceptance cum work order for Strengthing of existing concrete road for movement of rig machineries for sinking of big dia Tube well at PH No- 2 within Chutkia Radhanagar w/s scheme, Minakhan block under Hasnabad Sub- Division P.H.E. Dte. ORD/000886/2023-2024 1128/HSD 05/09/2023 7 NURJAHAN ENTERPRISE. 1.69 1.51 100
857 Barasat Division Construction and Repairing works of damaged part of Boundary wall, Main Gate, Drain, Valve Chamber and allied works due to DI Pipe stacking and shifting at Bagdah High School play ground for Bongaon-Bagdah surface water based PWSS within the jurisdiction of Bongaon Sub-Division under Barasat Division, P.H.E. Dte. ORD/000886/2024-2025 1393/Bon 27/11/2024 25 VAI ENTERPRISE. 4.73 0.00 0
858 Barasat Division Acceptance cum work order for Laying of different dia. UPVC pipe line for damage portion due to construction of concrete road at Mamudpur Purba & Paschim para within Hingalganj W/S Scheme (Z-I), Hingalganj block under Hasnasbad Sub-Division, P.H.E.Dte. ORD/000887/2022-2023 936/HSD 07/06/2022 10 MONDAL & CO. (BASIRHAT). 3.37 0.00 1
859 Barasat Division Acceptance cum work order for Strengthing of Brick pavement road for movement of rig machineries for sinking of big dia Tube well at PH No-2 within Sankardaha w/s scheme, Minakhan block under Hasnabad Sub- Division P.H.E. Dte. ORD/000887/2023-2024 1129/HSD 05/09/2023 7 RUDRA DAS. 3.55 3.51 100
860 Barasat Division Acceptance cum work order for Construction of approach road with cement concrete at PH No.-1 within Sultanpur w/s scheme, Minakhan block under Hasnabad Sub-Division P.H.E. Dte. ORD/000888/2023-2024 1130/HSD 05/09/2023 7 ANKUSH CONSTRUCTION & CO. 1.83 1.64 100
861 Barasat Division Repairing and renovation of Pump House No.- 3 under Augmentation of Helencha Water Supply Scheme within the jurisdiction of Bongaon Sub-Division under Barasat Division, P.H.E. Dte. ORD/000889/2024-2025 1396/Bon 27/11/2024 20 KAMAL HALDER. 1.76 1.73 100
862 Barasat Division Acceptance cum work order for Sinking of 1 Nos. 300.00 mtr. Deep 100 X 50 mm. dia. Trial-cum-production Tube well fitted with Indian Mark - II pump with PVC pipe & strainers at T/W site-1 for Atpukur w/s scheme (Zone-II), Minakhan block under Hasnabad Sub-Division, P.H.E. Dte. ORD/000890/2023-2024 1132/HSD 05/09/2023 30 SARKAR ENTERPRISE & CO. 2.63 2.00 100
863 Barasat Division Improvement of Iron Elimination Plant and other related allied works at Kurulia (Zone - II) W/S Scheme within the jurisdiction of Bongaon Sub-Division under Barasat Division, P.H.E. Dte. ORD/000891/2023-2024 638/Bon 14/08/2023 15 SAMBHU RAY CHOWDHURY. 2.49 2.41 100
864 Barasat Division Acceptance cum work order for sinking of Additional 1 no. 300 mm. x 200 mm. dia. 360 mtr deep Tube well by D.R. Rig method with PVC pipe & strainer having 300mm dia 48 mtr. long housing pipe & 200mm dia 30 mtr. long filter within Dakshin Akhratala w/s scheme, Sandeshkhali-I block under Hasnabad Sub-Division, P.H.E. Dte. ORD/000892/2024-2025 3376/BD 02/12/2024 60 M/S K.P.PAL. 25.88 0.00 0
865 Barasat Division Special repair & renovation of pump house and other Allied Works for Pump House No - 1 of Khosdelpur & Adj. Mouzas W/S scheme in connection with Augmentation work under JJM project within the jurisdiction of Habra Sub-Division under Barasat Division, P.H.E. Dte. ORD/000893/2024-2025 925/HAB 05/11/2024 20 M/S SUKANTA ENTERPRISE. 2.66 0.00 0
866 Barasat Division Special repair & renovation of pump house and other Allied Works for Pump House No - 1 of Talsa W/S scheme in connection with Augmentation work under JJM project within the jurisdiction of Habra Sub-Division under Barasat Division, P.H.E. Dte. ORD/000894/2024-2025 926/HAB 05/11/2024 20 JP CONSTRUCTION & SUPPLIERS. 2.66 0.00 0
867 Barasat Division Formal work order for Improvement of Iron Elimination Plant and other related allied works at Kurulia (Zone-I) W/S Scheme within the jurisdiction of Bongaon Sub-Division under Barasat Division, P.H.E. Dte. ORD/000896/2023-2024 637/Bon 14/08/2023 15 TAPAN GHOSH. 2.45 0.00 99
868 Barasat Division Urgently repairing and laying of badly damaged pipe line and FHTC connection due to construction of Gram Panchayat surface drain at Nakful area of Panchita Water Supply Scheme within the jurisdiction of Bongaon Sub-Division under Barasat Division, P.H.E.Dte. ORD/000897/2023-2024 625/Bon 08/08/2023 15 PRABIR KUMAR MONDAL. 0.71 0.70 100
869 Barasat Division Special repair & renovation of pump house and other Allied Works for Pump House No - 2 of Kankpul W/S scheme in connection with Augmentation work under JJM project within the jurisdiction of Habra Sub-Division under Barasat Division, P.H.E. Dte. ORD/000897/2024-2025 930/HAB 05/11/2024 20 VAI ENTERPRISE. 2.60 0.00 0
870 Barasat Division Formal work order for Construction of switch room cum chlorine room with sanitary & water supply arrangement including plinth protection at PH No.-1 (Size-5.40x3.60 mtr.) & PH No-2 & 3 (Size-3.60x3.00 mtr.), Laying of DI rising main, DI/UPVC distribution pipe line, Providing Functional Household Tap Connection, Protection works for different dia. UPVC/DI distribution pipeline by UC bullah/Bamboo pile, Construction of 300 cum capacity 20 mtr. staging height R.C.C. Over Head Water Reservoir as per Departmental design, drawing and specification including bored pile & pile cap within Kusangra W/S Scheme, Minakhan Block under Hasnabad Sub-Division, P.H.E. Dte. ORD/000898/2023-2024 2703/BD 04/09/2023 1096 M/S PROGATI ENTERPRISE. 439.52 167.09 20
871 Barasat Division Acceptance cum work order for Repair and renovation works of 250cum capacity 20mtr. staging height R.C.C. over Head Reservoir for Augmentation of Malidah Water Supply Scheme, Bagdah Block within the Jurisdiction of Bongaon Sub-Division under Barasat Division, P.H.E. Dte. ORD/000898/2024-2025 3404/BD 04/12/2024 180 PRABIR KUMAR MONDAL. 7.90 0.00 100
872 Barasat Division Acceptance cum work order for Construction of 150 cum. capacity 20 mtr. staging height R.C.C. Over Head Water Reservoir as per Departmental design, drawing and specification including bored pile, pile cap & Soil Investigation within command area for Augmentation of Chhaygharia Zone-II Water Supply Scheme under Bongaon Sub-Division, PHE Dte. ORD/000899/2023-2024 2797/BD 12/09/2023 730 JOY HIND TUBEWELLS. 91.85 23.41 60
873 Barasat Division Special repair & renovation of pump house and other Allied Works for Pump House No - 2 of Talsa W/S scheme in connection with Augmentation work under JJM project within the jurisdiction of Habra Sub-Division under Barasat Division, P.H.E. Dte. ORD/000899/2024-2025 931/HAB 05/11/2024 20 M/S SUKANTA ENTERPRISE. 2.60 0.00 0
874 Barasat Division Formal work order for Construction of switch room cum chlorine room with sanitary & water supply arrangement including plinth protection at PH No.-1 (Size-5.40x3.60 mtr.) & PH No-2 (Size-3.60x3.00 mtr.), Laying of DI rising main and DI/UPVC distribution pipe line, Providing Functional Household Tap Connection, Protection works for different dia. UPVC/DI distribution pipeline by UC bullah/Bamboo pile, Construction of 250 cum capacity 20 mtr. staging height R.C.C. Over Head Water Reservoir as per Departmental design, drawing and specification including bored pile & pile cap within Mathbari Abad W/S Scheme, Sandeshkhali-I Block under Hasnabad Sub-Division, P.H.E. Dte. ORD/000900/2023-2024 2704/BD 04/09/2023 1094 M/S DATTA ENTERPRISE. 442.43 305.29 85
875 Barasat Division Special repair and renovation of pump house and other Allied Works for Pump House No - 2 of Talsa and Adj Mouzas W/S scheme in connection with Augmentation work under JJM project within the jurisdiction of Habra Sub-Division under Barasat Division, P.H.E. Dte. ORD/000900/2024-2025 932/HAB 05/11/2024 20 M/S SANKAR ENTERPRISE. 2.58 0.00 0
876 Barasat Division Construction of Service Road 55 Mtr. Length X 2 Mtr. Width for Pump House No1 of kamarpur Water Supply Scheme in connection with Augmentation work under JJM project within the jurisdiction of Habra Sub-Division under Barasat Division, PHE Dte. ORD/000901/2024-2025 934/HAB 06/11/2024 10 M/S LATIKA CONSTRUCTION. 3.35 0.00 0
877 Barasat Division Acceptance cum work order for Sinking of 1 nos. 250 mm. x 150 mm. dia. 270 mtr deep tubewell by D.R. Rig method having 250 mm. dia. 36 mtr. long housing pipe & 150 mm. dia. 30 mtr. long Filter at Pump House No. - 3 for Augmentation of Gaighata water supply scheme within the jurisdiction of Habra Sub-Division, under Barasat Division, P.H.E. Dte. ORD/000903/2023-2024 2778/BD 11/09/2023 30 B.M.ENGINEERING. & CONSTRUCTION. 14.47 11.64 100
878 Barasat Division Formal work order for Construction of switch room cum chlorine room with sanitary & water supply arrangement including plinth protection at PH No.-1 (Size-5.40x3.60 mtr.) & PH No-2 (Size-3.60x3.00 mtr.), Laying of DI rising main and DI/UPVC distribution pipe line, Providing Functional Household Tap Connection, Protection works for different dia. DI/UPVC rising/distribution pipeline by UC bullah/Bamboo pile at different places, Construction of 200 cum capacity 20 mtr. staging height R.C.C. Over Head Water Reservoir as per Departmental design, drawing and specification including bored pile & pile cap for Petua Dhanihati W/S Scheme, Sandeshkhali-I Block under Hasnabad Sub-Division, P.H.E. Dte. ORD/000901/2023-2024 2705/BD 04/09/2023 1096 M/S NIRMAN CONSTRUCTION. 379.24 219.83 70
879 Barasat Division Special repair and renovation of pump house and other Allied Works of Pump House No - 1 under Talsa and Adj Mouzas WS scheme in connection with Augmentation work under JJM project within the jurisdiction of Habra Sub-Division under Barasat Division, P.H.E. Dte. ORD/000904/2024-2025 936/HAB 06/11/2024 20 TALUKDER & CO. 2.66 0.00 0
880 Barasat Division Acceptance cum work order for Strengthing of existing concrete & Brick pavement road for movement of rig machineries for sinking of big dia Tube well at PH No-1 within Sankardaha w/s scheme, Minakhan block under Hasnabad Sub- Division P.H.E. Dte. ORD/000906/2023-2024 2717/BD 05/09/2023 7 ARBINA ENTERPRISE. 5.56 5.55 100
881 Barasat Division Acceptance cum work order for Repairing of Pump house and Dismantling, Re-construction of boundary wall and approach road for movement of rig & other machineries for sinking of big dia. TW at PH no- 1 in connection with Augmentation of Rajbari w/s scheme, Sandeshkhali-I block under Hasnabad Sub-Division P.H.E. Dte. ORD/000907/2023-2024 2718/BD 05/09/2023 21 M/S ANUBHAB CONSTRUCTION. 5.06 4.45 100
882 Barasat Division Acceptance cum work order for Repairing of Pump House at PH No- 1, 2 & 3 for Khulna Bhandarkhali w/s scheme (Zone-I), Sandeshkhali-II block under Hasnabad Sub-Division P.H.E. Dte. ORD/000908/2023-2024 2719/BD 05/09/2023 21 LAHIRI CONSTRUCTION. 6.11 6.01 80
883 Barasat Division Acceptance cum work order for Repairing of existing boundary wall and other allied works at Pump House No.-1 within Kalinagar w/s scheme (Old), Sandeshkhali-I block under Hasnabad Sub-Division P.H.E. Dte. ORD/000909/2023-2024 2720/BD 05/09/2023 21 ABDUL ALIM MONDAL. 9.09 9.09 100
884 Barasat Division Acceptance cum work order for Strengthening of existing concrete road for movement of rig machineries for sinking of big dia Tube well at PH No 2 within Bargan Gopalpur w/s scheme, Minakhan block under Hasnabad Sub- Division P.H.E. Dte. ORD/000910/2023-2024 2732/BD 07/09/2023 7 GIRIDHARI DAS 5.00 4.96 100
885 Barasat Division Acceptance cum work order for Sinking of 1 nos. 250 mm. x 150 mm. dia. 270 mtr deep tubewell by D.R. Rig method having 250 mm. dia. 36 mtr. long housing pipe & 150 mm. dia. 30 mtr. long Filter at Pump House No. - 2 for Augmentation of Janaphul water supply scheme within the jurisdiction of Habra Sub-Division, under Barasat Division, P.H.E. Dte. ORD/000911/2023-2024 2777/BD 11/09/2023 30 M/S K.P.PAL. 14.50 0.00 0
886 Barasat Division Formal Work Order for Providing Functional Household Tap Connection(FHTC) from existing and new proposed distribution system within the command area of Itinda Panitar Water Supply Scheme at Basirhat - I Block under Barasat Division, PHE Dte. (Phase - I) ORD/000912/2021-2022 2622/BD 27/12/2021 90 SUBHASH BOSE. 171.59 164.59 1
887 Barasat Division Acceptance cum work order for Sinking of 2 nos. 250 mm. x 150 mm. dia. 270 mtr deep tube well by D.R. Rig method having 250 mm. dia. 36 mtr. long housing pipe & 150 mm. dia. 30 mtr. long Filter at Pump House No. - 1 & 2 for Augmentation of Kamarpur & Adjoining Mouzas water supply scheme within the jurisdiction of Habra Sub-Division, under Barasat Division, P.H.E. Dte. ORD/000912/2023-2024 2776/BD 11/09/2023 60 ANJALI ENTERPRISE. 28.99 12.33 65
888 Barasat Division Formal Work order for Providing Functional Household Tap Connection (FHTC) in connection with Jal Jeevan Mission (JJM and JAL SWAPNA) under command area of BIRA RAJIBPUR Water Supply Scheme at Habra -II Block within the jurisdiction of Habra Sub-Division, under Barasat Division, P.H.E. Dte. (Phase - I) ORD/000914/2021-2022 2623/BD 27/12/2021 90 J.D.J.ENTERPRISE. (TRADERS PVT.LTD) 189.09 156.26 1
889 Barasat Division Acceptance cum work order for Sinking of 2 nos. 250 mm. x 150 mm. dia. 270 mtr deep tubewell by D.R. Rig method having 250 mm. dia. 36 mtr. long housing pipe & 150 mm. dia. 30 mtr. long Filter at Pump House No. - 1 & 2 for Augmentation of Khosdelpur & Adjoining Mouzas water supply scheme within the jurisdiction of Habra Sub-Division, under Barasat Division, P.H.E. Dte. ORD/000914/2023-2024 2774/BD 11/09/2023 60 ANJALI ENTERPRISE. 28.99 12.33 80
890 Barasat Division Formal Work Order for Providing Functional Household Tap Connection (FHTC) in connection with Jal Jeevan Mission (JJM and JAL SWAPNA) under command area of KHOSDELPUR & ITS ADJ. MOUZAS Water Supply Scheme at Habra - II Block within the jurisdiction of Habra Sub-Division, under Barasat Division, P.H.E. Dte. (Phase - I) ORD/000915/2021-2022 2624/BD 27/12/2021 90 MAHAVIR PUMPS MANUFACTURING PVT.LTD. 114.14 87.23 1
891 Barasat Division Acceptance cum work order for Protection works for newly laid 200mm dia. UPVC pipe line at N/H/O Susanta Ghosh at Hingalganj within Hingalganj w/s scheme (Zone-I), Hingalganj block under Hasnabad Sub-Division P.H.E. Dte. ORD/000915/2022-2023 935/HSD 07/07/2022 10 MONDAL & CO. (BASIRHAT). 2.36 2.35 1
892 Barasat Division Acceptance cum work order for Laying of 90 mm dia. UPVC pipe line from Boltala Kalupara More to near Katakhali Madrasa within Hingalganj W/S Scheme (Z-I), Hingalganj block under Hasnasbad Sub-Division, P.H.E.Dte. ORD/000917/2022-2023 937/HSD 07/07/2022 10 TRISHA ENTERPRISE & CO. 3.19 0.00 1
893 Barasat Division Acceptance cum work order for Supply of sluice valve i/c Construction of Sluice valve chamber and other allied works at different location within Bermajur w/s scheme, Sandeshkhali-II block under Hasnabad Sub- Division P.H.E. Dte. ORD/000920/2021-2022 1861/HSD. 17/11/2021 15 M/S NIRMAN CONSTRUCTION. 2.37 0.00 1
894 Barasat Division Acceptance cum work order for Supply of sluice valve i/c Construction of Sluice valve chamber and other allied works at different location within Bermajur w/s scheme, Sandeshkhali-II block under Hasnabad Sub- Division P.H.E. Dte. ORD/000921/2021-2022 1861/HSD.. 17/11/2021 15 M/S NIRMAN CONSTRUCTION. 2.37 2.37 0
895 Barasat Division Acceptance cum work order for Supply of sluice valve i/c Construction of Sluice valve chamber and other allied works at different location within Kumarjole w/s scheme, Minakhan Block under Hasnabad Sub- Division P.H.E. Dte. ORD/000926/2021-2022 1995/HSD.. 02/12/2021 15 ABDUL ALIM MONDAL. 3.50 3.50 1
896 Barasat Division Formal work order for Laying of DI rising main, DI/UPVC distribution pipe line and providing Functional Household Tap Connection in connection with Augmentation of Padmapukuria water supply scheme (Zone-I), Minakhan Block under Hasnabad Sub-Division, PHE Dte. ORD/000928/2022-2023 127/BD 16/01/2023 90 MONDAL & CO. (BASIRHAT). 416.99 369.68 1
897 Barasat Division Route Survey, Design Drawing & DPR Preparation for Kamarpur & Adj. Mouzas W/S Scheme within the jurisdiction of the Habra Sub-Division under Barasat Division, PHE Dte. ORD/000935/2021-2022 558/HAB 20/12/2021 10 UMWELT ENGINEER PVT.LTD. 3.42 3.41 1
898 Barasat Division Route Survey, Design Drawing & DPR Preparation for Talsa W/S Scheme within the jurisdiction of the Habra Sub-Division under Barasat Division, PHE Dte. ORD/000938/2021-2022 559/HAB 20/12/2021 10 UMWELT ENGINEER PVT.LTD. 3.67 3.70 1
899 Barasat Division Formal work order for Laying of DI rising main, DI/UPVC distribution pipe line and providing Functional Household Tap Connection in connection with Augmentation of Sahebkhali water supply scheme (Zone-II), Hingalganj Block under Hasnabad Sub-Division, PHE Dte. ORD/000938/2022-2023 88/BD 11/01/2023 90 M/S NIRMAN CONSTRUCTION. 354.45 323.20 1
900 Barasat Division Route Survey, Design Drawing & DPR Preparation for Kankpul W/S Scheme within the jurisdiction of the Habra Sub-Division under Barasat Division, PHE Dte. ORD/000939/2021-2022 567/HAB 22/12/2021 10 UMWELT ENGINEER PVT.LTD. 4.02 4.02 1
901 Barasat Division Formal Work Order cor Providing Functional Household Tap Connection (FHTC) in connection with Jal Jeevan Mission (JJM and JAL SWAPNA) under command area of MASLANDAPUR Water Supply Scheme(ZONE-II) at Habra - I Block within the jurisdiction of Habra Sub-Division, under Barasat Division, P.H.E. Dte. (Phase - I). ORD/000944/2021-2022 01/BD 03/01/2022 90 M/S B.K.ENTERPRISE. 145.09 139.68 1
902 Barasat Division Formal work order for Laying of DI rising main, DI/UPVC distribution pipe line and providing Functional Household Tap Connection in connection with Augmentation of Barunhat Patlikhanpur water supply scheme (Zone-II), Hasnabad Block under Hasnabad Sub-Division, PHE Dte. ORD/000946/2022-2023 87/BD 11/01/2023 90 R.K.MANDAL & CO. 317.90 310.72 80
903 Barasat Division Formal work order for Laying of DI rising main, DI/UPVC distribution pipe line and providing Functional Household Tap Connection in connection with Augmentation of Durgapur Baylani water supply scheme (Zone-II), Hingalganj Block under Hasnabad Sub-Division, PHE Dte. ORD/000947/2022-2023 89/BD 11/01/2023 90 M/S DATTA ENTERPRISE. 349.57 348.44 0
904 Barasat Division Continuation order for one motor launch (M.V. JOYMAKALI) on daily hire basis for use of Hasnabad Sub-Division, P.H.E. Dte. Period : 01.09.22 to 28.02.23=181 days. ORD/000949/2022-2023 1484/HSD 29/08/2022 183 SUSMITA MANDAL. 2.70 9.29 100
905 Barasat Division Acceptance cum work order for Route Survey, Design Drawing & DPR Preparation for Sahebkhali (Zone-I & Zone-II) Water Supply Scheme under Barasat Division, PHE Dte. ORD/000952/2021-2022 2146/HSD 28/12/2021 21 SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. 4.76 4.76 1
906 Barasat Division Acceptance cum work order for additional Survey Work For DPR Preparation of Sahebkhali (Zone-I & Zone-II) Water Supply Scheme under Barasat Division, PHE Dte. ORD/000953/2021-2022 2147/HSD 28/12/2021 21 SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. 2.84 2.79 1
907 Barasat Division Acceptance cum work order for Route Survey, Design Drawing & DPR Preparation for Monipur Water Supply Scheme under Barasat Division, PHE Dte. ORD/000954/2021-2022 2150/HSD 28/12/2021 21 SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. 4.84 4.84 1
908 Barasat Division Formal work order for Laying of DI rising main, DI/UPVC distribution pipe line and Providing Functional House Hold Tap Connection (FHTC) for Augmentation of Kalupur Water Supply Scheme under Bongaon Sub-Division, PHE Dte. ORD/000954/2022-2023 93/BD 11/01/2023 900 M/S S.S.ENTERPRISE. (SOUTH) 454.09 407.31 90
909 Barasat Division Acceptance cum work order for Sinking of 2 nos. 250 mm. x 150 mm. dia. 270 mtr deep tubewell by D.R. Rig method having 250 mm. dia. 36 mtr. long housing pipe & 150 mm. dia. 30 mtr. long Filter at Pump House No. - 2 & 3 for Augmentation of Maslandapur (Zone - I) water supply scheme within the jurisdiction of Habra Sub-Division, under Barasat Division, P.H.E. Dte. ORD/000954/2023-2024 2773/BD 11/09/2023 60 NADIA TUBEWELLS 28.96 0.00 0
910 Barasat Division Acceptance cum work order for Route Survey, Design Drawing & DPR Preparation for Malancha Zone I Water Supply Scheme under Barasat Division, PHE Dte. ORD/000955/2021-2022 2151/HSD 28/12/2021 21 SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. 4.43 4.40 1
911 Barasat Division Formal work order for Laying of DI rising main, DI/UPVC distribution pipe line and providing Functional Household Tap Connection in connection with Augmentation of Srinagar water supply scheme in Basirhat-II Block of North 24 Parganas district under under Barasat Division, PHE Dte. ORD/000955/2022-2023 92/BD 11/01/2023 90 CHANDA CONSTRUCTION. 376.97 348.89 82
912 Barasat Division Acceptance cum work order for Route Survey, Design Drawing & DPR Preparation for Malancha Zone II Water Supply Scheme under Barasat Division, PHE Dte. ORD/000956/2021-2022 2152/HSD 28/12/2021 21 SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. 3.77 3.75 1
913 Barasat Division Acceptance cum work order for Route Survey, Design Drawing & DPR Preparation for Murarisha Water Supply Scheme under Barasat Division, PHE Dte. ORD/000957/2021-2022 2153/HSD 28/12/2021 21 SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. 4.05 4.05 1
914 Barasat Division Acceptance cum work order for Sinking of 1 nos. 250 mm. x 150 mm. dia. 270 mtr deep tubewell by D.R. Rig method having 250 mm. dia. 36 mtr. long housing pipe & 150 mm. dia. 30 mtr. long Filter at Pump House No. - 1 for Augmentation of Sadpur water supply scheme within the jurisdiction of Habra Sub-Division, under Barasat Division, P.H.E. Dte. ORD/000959/2023-2024 2772/BD 11/09/2023 653 NADIA TUBEWELLS 14.48 0.00 0
915 Barasat Division Acceptance cum work order for Route Survey, Design Drawing & DPR Preparation for Bhabanipur (Zone-I & Zone-II) Water Supply Scheme under Barasat Division, PHE Dte. ORD/000960/2021-2022 2156/HSD 28/12/2021 21 SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. 4.76 4.76 1
916 Barasat Division Acceptance cum work order for Route Survey, Design Drawing & DPR Preparation for Durgapur Baylani Zone I Water Supply Scheme under Barasat Division, PHE Dte. ORD/000961/2021-2022 2158/HSD 28/12/2021 21 SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. 4.18 4.13 1
917 Barasat Division Acceptance cum work order for Route Survey, Design Drawing & DPR Preparation for Hasnabad Water Supply Scheme under Barasat Division, PHE Dte. ORD/000966/2021-2022 2163/HSD 28/12/2021 21 SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. 4.21 4.21 1
918 Barasat Division Acceptance cum work order for Route Survey, Design Drawing & DPR Preparation for Chaital Water Supply Scheme under Barasat Division, PHE Dte. ORD/000967/2021-2022 2164/HSD 28/12/2021 21 SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. 4.49 4.48 1
919 Barasat Division Construction of Approach Road at 2nd Pump House site for Augmentation of Gangrapota Water Supply Scheme within the jurisdiction of Bongaon Sub-Division under Barasat Division, P.H.E. Dte. ORD/000967/2023-2024 555/Bon 18/07/2023 15 M/S SAYAN ENTERPRISE. 0.80 0.79 100
920 Barasat Division Construction of Approach Road at 2ndT/W site for Augmentation of Bharatpur Water Supply Scheme within the jurisdiction of Bongaon Sub-Division under Barasat Division, P.H.E.Dte. ORD/000968/2023-2024 556/Bon 18/07/2023 15 GHOSH CONSTRUCTION. 0.92 0.92 100
921 Barasat Division Construction of Approach Road at 2nd T/W site for Augmentation of Krishnachandrapur Water Supply Scheme within the jurisdiction of Bongaon Sub-Division under Barasat Division, P.H.E.Dte. ORD/000969/2023-2024 557/Bon 18/07/2023 15 ACHINTA KUMAR HALDER. 0.91 0.00 0
922 Barasat Division Route Survey, Design Drawing & DPR Preparation for Bergum W/S Scheme within the jurisdiction of the Habra Sub-Division under Barasat Division, PHE Dte. ORD/000970/2021-2022 571/HAB 23/12/2021 10 SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. 4.71 4.71 1
923 Barasat Division Formal work order for Providing Functional Household Tap Connection (FHTC) in connection with retrofitting of Kanmari w/s scheme (Zone-I), Sandeshkhali-I block under Hasnabad Sub-Division, PHE Dte. ORD/000971/2022-2023 99/BD 11/01/2023 90 SRI KRISHNA CO-OP-LABOUR CONTRACT AND CONST SOC LTD. 282.73 277.60 1
924 Barasat Division Construction of Approach Road at 2ndT/W site for Augmentation of Panchita Water Supply Scheme within the jurisdiction of Bongaon Sub-Division under Barasat Division, P.H.E.Dte. ORD/000971/2023-2024 559/Bon 18/07/2023 15 PRABIR KUMAR MONDAL. 0.87 0.87 100
925 Barasat Division Construction of Approach Road at 2ndT/W site for Augmentation of Sindrani (Zone-I) Water Supply Scheme within the jurisdiction of Bongaon Sub-Division under Barasat Division, P.H.E.Dte. ORD/000972/2023-2024 562/Bon 18/07/2023 15 ONKAR ENTERPRISE. 0.89 0.00 0
926 Barasat Division Acceptance cum work order for Route Survey, Design Drawing & DPR Preparation for Mohanpur (Zone-I & Zone-II) Water Supply Scheme under Barasat Division, PHE Dte. ORD/000973/2021-2022 2140/HSD 28/12/2021 21 TIYAS CONSULTANCY AND INFRASTRUCTURE PVT.LTD. 4.77 4.77 1
927 Barasat Division Acceptance cum work order for Sinking of 2 nos. 250 mm. x 150 mm. dia. 270 mtr deep tube well by D.R. Rig method having 250 mm. dia. 36 mtr. long housing pipe & 150 mm. dia. 30 mtr. long Filter at Pump House No. - 1 & 2 for Augmentation of Talsa water supply scheme within the jurisdiction of Habra Sub-Division, under Barasat Division, P.H.E. Dte. ORD/000973/2023-2024 2781/BD 11/09/2023 60 M/S K.P.PAL. 28.99 24.49 100
928 Barasat Division Acceptance cum work order for Additional Survey Work For DPR Preparation of Mohanpur (Zone-I & Zone-II) Water Supply Scheme under Barasat Division, PHE Dte. ORD/000974/2021-2022 2141/HSD 28/12/2021 21 TIYAS CONSULTANCY AND INFRASTRUCTURE PVT.LTD. 2.33 2.32 1
929 Barasat Division Formal work order for Providing Functional Household Tap Connection (FHTC) in connection with retofitting of Kanmari w/s scheme (Zone-II), Sandeshkhali-I block under Hasnabad Sub-Division, PHE Dte. ORD/000974/2022-2023 100/BD 11/01/2023 90 M/S PROGATI ENTERPRISE. 297.96 291.19 1
930 Barasat Division Acceptance cum work order for Sinking of 2 no. 300 mm. x 200 mm. dia. 270 mtr deep tubewell by D.R. Rig method having 300 mm. dia. 36 mtr. long housing pipe & 200 mm. dia. 30 mtr. long Filter at Pump House No. - 1 & 2 for Augmentation of Deora water supply scheme within the jurisdiction of Habra Sub-Division, under Barasat Division, P.H.E. Dte. ORD/000974/2023-2024 2780/BD 11/09/2023 60 M/S SUKANTA ENTERPRISE. 39.10 32.57 80
931 Barasat Division Acceptance cum work order for Route Survey, Design Drawing & DPR Preparation for Sandeshkhali Water Supply Scheme under Barasat Division, PHE Dte. ORD/000975/2021-2022 2148/HSD 28/12/2021 21 TIYAS CONSULTANCY AND INFRASTRUCTURE PVT.LTD. 3.92 3.92 1
932 Barasat Division Acceptance cum work order for Sinking of 2 no. 300 mm. x 200 mm. dia. 270 mtr deep tubewell by D.R. Rig method having 300 mm. dia. 36 mtr. long housing pipe & 200 mm. dia. 30 mtr. long Filter at Pump House No. - 1 & 2 for Augmentation of Talsa & Adj Mouzas water supply scheme within the jurisdiction of Habra Sub-Division, under Barasat Division, P.H.E. Dte. ORD/000975/2023-2024 2779/BD 11/09/2023 60 M/S SUKANTA ENTERPRISE. 39.10 30.09 100
933 Barasat Division Acceptance cum work order for Additional Survey Work For DPR Preparation of Sandeshkhali Water Supply Scheme under Barasat Division, PHE Dte. ORD/000976/2021-2022 2149/HSD 28/12/2021 21 TIYAS CONSULTANCY AND INFRASTRUCTURE PVT.LTD. 1.17 1.17 1
934 Barasat Division Acceptance cum work order for Emergent restoration of existing FHTC along with pipe line in connection with retrofitting work at different places within Jhupkhali mouza due to erosion of soil for heavy rain fall during monsoon season within Jhupkhali w/s scheme, Sandeshkhali-II block under Hasnasbad Sub-Division, P.H.E.Dte. ORD/000976/2023-2024 1064/HSD 31/08/2023 10 JESMINE ENTERPRISE. 0.98 0.98 100
935 Barasat Division Acceptance cum work order for Sinking of 1 no. 300 mm. x 200 mm. big dia. 330 mtr deep tubewell by D.R. Rig method using PVC pipe & strainer having 300 mm dia. 36 mtr. long filter for Augmentation of Bithari Zone-IIB water supply scheme in Baduria Block of Basirhat Sub-Division, under Barasat Division, P.H.E. Dte. ORD/000977/2023-2024 2801/BD 12/09/2023 30 DHELA BABA ENTERPRISE 23.31 0.00 0
936 Barasat Division Acceptance cum work order for Estimate for Additional Survey Work For DPR Preparation of Bhabanipur (Zone-I & Zone-II) Water Supply Scheme under Barasat Division, PHE Dte. ORD/000978/2021-2022 2157/HSD 28/12/2021 21 TIYAS CONSULTANCY AND INFRASTRUCTURE PVT.LTD. 3.47 3.44 1
937 Barasat Division Acceptance cum work order for Sinking of 1 no. 300 mm. x 200 mm. big dia. 300 mtr deep tubewell by D.R. Rig method using PVC pipe & strainer having 300 mm dia. 36 mtr. long filter for Augmentation of Nalabara Zone-II water supply scheme in Swarupnagar Block of Basirhat Sub-Division, under Barasat Division, P.H.E. Dte. ORD/000980/2023-2024 2800/BD 12/09/2023 30 DHELA BABA ENTERPRISE 21.53 0.00 0
938 Barasat Division Formal work order for Road restoration work damaged during pipe laying work under JJM in different water supply scheme under Barasat-II and Deganga block under Barasat Division P.H.E.Dte. ORD/000980/2024-2025 393/BD 05/02/2025 120 MONDAL ENTERPRISE. (BARASAT) 167.48 0.00 0
939 Barasat Division Acceptance cum work order for Route Survey, Design Drawing & DPR Preparation for Chandpur Water Supply Scheme under Barasat Division, PHE Dte. ORD/000981/2021-2022 2166/HSD 28/12/2021 21 TIYAS CONSULTANCY AND INFRASTRUCTURE PVT.LTD. 4.50 4.46 1
940 Barasat Division Acceptance cum work order for Protection works for newly laid different dia. UPVC/DI pipe line at Joygram Molla para N/H/O Emdadul Haque in connection with Augmentation of Malancha w/s scheme (Z-I), Minakhan Block under Hasnabad Sub-Division, PHE Dte. ORD/000983/2024-2025 3461/BD 09/12/2024 30 M/S ANUBHAB CONSTRUCTION. 8.77 0.00 0
941 Barasat Division Continuation work order for Hiring of 1 no. of Diesel Luxury Car (Euro - IV/VI) in good condition (traffic worthy) on daily basis for office use of the Assistant Engineer, Habra Sub-Division, under Barasat Division P.H.E. Dte. (For the period from : 01.12.24 to 31.05.25) ORD/000985/2024-2025 993/HAB 29/11/2024 182 M/S LATIKA CONSTRUCTION. 0.86 1.83 0
942 Barasat Division Acceptance cum work order for Route Survey, Design Drawing & DPR Preparation for Chhaimalpur Water Supply Scheme under Barasat Division, PHE Dte. ORD/000986/2021-2022 2169/HSD 28/12/2021 21 TIYAS CONSULTANCY AND INFRASTRUCTURE PVT.LTD. 2.79 2.79 1
943 Barasat Division Acceptance cum work order for Route Survey, Design Drawing & DPR Preparation for Ashari Narayanpur Water Supply Scheme under Barasat Division, PHE Dte. ORD/000987/2021-2022 2170/HSD 28/12/2021 21 SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. 3.61 3.59 1
944 Barasat Division Acceptance cum work order for Sinking of 1 no. 300 mm. x 200 mm. big dia. 300 mtr deep tubewell by D.R. Rig method using PVC pipe & strainer having 300 mm dia. 36 mtr. long filter for Augmentation of Bajitpur Zone-IB water supply scheme in Baduria Block of Basirhat Sub-Division, under Barasat Division, P.H.E. Dte. ORD/000987/2023-2024 2802/BD 12/09/2023 30 DHELA BABA ENTERPRISE 21.53 0.00 0
945 Barasat Division Acceptance cum work order for Route Survey, Design Drawing & DPR Preparation for Kumarjole Water Supply Scheme under Barasat Division, PHE Dte. ORD/000988/2021-2022 2171/HSD 28/12/2021 21 UMWELT ENGINEER PVT.LTD. 4.24 4.24 1
946 Barasat Division Acceptance cum work order for Protection works for protection of newly laid UPVC distribution pipe line at N/H/O Pankaj Mondal at Jhikra Majher para within Jhikra w/s scheme, Minakhan block under Hasnabad Sub-Division P.H.E. Dte. ORD/000988/2024-2025 3642/BD 23/12/2024 120 GAZI ENTERPRISE 9.32 0.00 100
947 Barasat Division Acceptance cum work order for Protection works for protection of newly laid UPVC distribution pipe line at near Jhikra Radhagobinda Mandir at Jhikra Purba para within Jhikra w/s scheme, Minakhan block under Hasnabad Sub-Division P.H.E. Dte. ORD/000989/2024-2025 3465/BD 09/12/2024 30 STAR CONSTRUCTION. 9.41 0.00 0
948 Barasat Division Acceptance cum work order for Route Survey, Design Drawing & DPR Preparation for Korakati Water Supply Scheme under Barasat Division, PHE Dte. ORD/000990/2021-2022 2172/HSD 28/12/2021 21 UMWELT ENGINEER PVT.LTD. 4.12 4.12 1
949 Barasat Division Acceptance cum work order for Protection works for protection of newly laid UPVC distribution pipe line at N/H/O Utpal Mondal at Jhikra Paschim para within Jhikra w/s scheme, Minakhan block under Hasnabad Sub-Division P.H.E.Dte. ORD/000991/2024-2025 3676/BD 24/12/2024 30 A. M. ENTERPRISE (BASIRHAT) 9.06 0.00 0
950 Barasat Division Acceptance cum work order for Construction of Boundary Wall at Nandipara Kuchemora Under Berachampa Zone-IV Water Supply Scheme under Deganga Block, under Barasat Sub-Division, P.H.E.Dte. ORD/000992/2024-2025 3476/BD 10/12/2024 30 JP CONSTRUCTION & SUPPLIERS. 32.77 0.00 0
951 Barasat Division Acceptance cum work order for Route Survey, Design Drawing & DPR Preparation for Gabbaria Water Supply Scheme under Barasat Division, PHE Dte. ORD/000993/2021-2022 2173/HSD 28/12/2021 21 UMWELT ENGINEER PVT.LTD. 3.39 3.39 1
952 Barasat Division Acceptance cum work order for Route Survey, Design Drawing & DPR Preparation for Durgamondop Water Supply Scheme under Barasat Division, PHE Dte. ORD/000994/2021-2022 2175/HSD 28/12/2021 21 UMWELT ENGINEER PVT.LTD. 4.15 4.15 1
953 Barasat Division Acceptance cum work order for Construction of Protection wall for protection of UPVC distribution pipe line at N/H/O Ajay Manna & Bijon Manna at Mamudpur in connection with Augmentation of Hingalganj w/s scheme (Z-I), Hingalganj block under Hasnabad Sub-Division P.H.E. Dte. ORD/000994/2024-2025 3498/BD 11/12/2024 30 NURJAHAN ENTERPRISE. 7.55 0.00 0
954 Barasat Division Acceptance cum work order for the work of Hiring Diesel Luxury Car on daily basis for the Office of the Dy. Superintending Engineer-I, Monitoring Cell, PHE Dte. (Period from 01-01-2023 to 30-06-2023). ORD/000995/2022-2023 3867/BD 30/12/2022 181 DIPANKAR NASKAR. 0.86 1.85 1
955 Barasat Division Acceptance cum work order for Construction of Protection wall for protection of UPVC distribution pipe line at N/H/O Rabiul Gazi & Enamul Gazi in connection with Augmentation of Hingalganj w/s scheme (Z-II), Hingalganj block under Hasnabad Sub-Division P.H.E. Dte. ORD/000995/2024-2025 3740/BD 27/12/2024 30 CHITTARANJAN MONDAL 8.19 0.00 0
956 Barasat Division Acceptance cum work order for Emergent restoration of existing FHTC along with pipe line in connection with retrofitting work at different places within Rampur mouza due to erosion of soil for heavy rain fall during monsoon season within Rampur w/s scheme, Sandeshkhali-II block under Hasnasbad Sub-Division, P.H.E.Dte. ORD/000996/2023-2024 1080/HSD 31/08/2023 10 M/S RAJPATH CONSTRUCTION. 0.99 0.98 100
957 Barasat Division Acceptance cum work order for Construction of Protection wall for protection of UPVC distribution pipe line at N/H/O Abdul Dhali & Anar Dhali in connection with Augmentation of Hingalganj w/s scheme (Z-II), Hingalganj block under Hasnabad Sub-Division P.H.E. Dte. ORD/000996/2024-2025 3499/BD 11/12/2024 912 SARKAR ENTERPRISE 8.51 0.00 0
958 Barasat Division Acceptance cum work order for Construction of Protection wall for protection of UPVC distribution pipe line at pond of Monojit Gayen and near shop of Abdul Alim Gazi in connection with Augmentation of Hingalganj W/s scheme (Z-II), Hingalganj block under Hasnabad Sub-Division P.H.E. Dte. ORD/000997/2024-2025 3500/BD 11/12/2024 30 S.K.ENTERPRISE. 8.64 0.00 0
959 Barasat Division Acceptance cum work order for Additional Survey Work For DPR Preparation of Khulna Bhandarkhali Zone-I Water Supply Scheme under Barasat Division, PHE Dte. ORD/000998/2021-2022 2178/HSD 28/12/2021 21 SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. 2.08 2.08 1
960 Barasat Division Acceptance cum work order for Emergent restoration of existing FHTC along with pipe line in connection with retrofitting work at different places within Kanmari mouza due to erosion of soil for heavy rain fall during monsoon season within Kanmari w/s scheme (Z-I), Sandeshkhali-I block under Hasnasbad Sub-Division, P.H.E.Dte. ORD/000998/2023-2024 1082/HSD 31/08/2023 10 SARKAR ENTERPRISE 0.93 0.92 100
961 Barasat Division Acceptance cum work order for Route Survey, Design Drawing & DPR Preparation for Kalitala Water Supply Scheme under Barasat Division, PHE Dte. ORD/000999/2021-2022 2179/HSD 28/12/2021 21 TIYAS CONSULTANCY AND INFRASTRUCTURE PVT.LTD. 3.93 3.93 1
962 Barasat Division Acceptance cum work order for Sinking of 1 no. 300 mm. x 200 mm. big dia. 300 mtr deep tubewell by D.R. Rig method using PVC pipe & strainer having 300 mm dia. 36 mtr. long filter for Augmentation of Aturia Zone-II water supply scheme in Baduria Block of Basirhat Sub-Division, under Barasat Division, P.H.E. Dte. ORD/000999/2023-2024 2803/BD 12/09/2023 30 SAHA CONSTRUCTION & CO 21.53 0.00 0
963 Barasat Division Acceptance cum work order for Additional Survey Work For DPR Preparation of Kalitala Water Supply Scheme under Barasat Division, PHE Dte. ORD/001000/2021-2022 2180/HSD 28/12/2021 21 TIYAS CONSULTANCY AND INFRASTRUCTURE PVT.LTD. 2.52 2.52 1
964 Barasat Division Acceptance cum work order for Emergent restoration of existing FHTC along with pipe line in connection with retrofitting work at different places within Nalkora mouza due to erosion of soil for heavy rain fall during monsoon season within Kanmari w/s scheme (Z-I), Sandeshkhali-I block under Hasnasbad Sub-Division, P.H.E.Dte. ORD/001000/2023-2024 1083/HSD 31/08/2023 10 SARKAR ENTERPRISE 0.92 0.92 100
965 Barasat Division Acceptance cum work order for Route Survey, Design Drawing & DPR Preparation for Dakshin Bhebia Zone-II Water Supply Scheme under Barasat Division, PHE Dte. ORD/001001/2021-2022 2181/HSD 28/12/2021 21 SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. 3.93 3.93 1
966 Barasat Division Acceptance cum work order for Emergent restoration of existing FHTC along with pipe line in connection with retrofitting work at different places within Nazat mouza due to erosion of soil for heavy rain fall during monsoon season within Kanmari w/s scheme (Z-II), Sandeshkhali-I block under Hasnasbad Sub-Division, P.H.E.Dte. ORD/001001/2023-2024 1084/HSD 31/08/2023 10 M/S PROGATI ENTERPRISE. 0.95 0.95 100
967 Barasat Division Acceptance cum work order for Restoration of concrete roads in different location at Dhanyakuria water supply scheme in Basirhat II Block within Basirhat Sub-Division under Barasat Division P.H.E.Dte. ORD/001001/2024-2025 07/BD 02/01/2025 30 GAZI CONSTRUCTION 66.05 0.00 0
968 Barasat Division Acceptance cum work order for Additional Survey Work For DPR Preparation of Dakshin Bhebia Zone-II Water Supply Scheme under Barasat Division, PHE Dte. ORD/001002/2021-2022 2182/HSD 28/12/2021 21 SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. 1.99 1.99 1
969 Barasat Division Acceptance cum work order for Emergent restoration of existing FHTC along with pipe line in connection with retrofitting work at different places within Hatgachi mouza due to erosion of soil for heavy rain fall during monsoon season within Kanmari w/s scheme (Z-II), Sandeshkhali-I block under Hasnasbad Sub-Division, P.H.E.Dte. ORD/001002/2023-2024 1085/HSD 31/08/2023 10 M/S PROGATI ENTERPRISE. 0.94 0.94 100
970 Barasat Division Formal work order for Laying of DI/UPVC distribution pipe line and Providing Functional House Hold Tap Connection (FHTC) for Augmentation of Hariharpur Water Supply Scheme, Bagdah Block under Bongaon Sub-Division, PHE Dte. ORD/001006/2022-2023 175/BD 19/01/2023 900 M/S R.K. ENTERPRISE 173.76 114.27 62
971 Barasat Division Formal work order for Laying of DI/UPVC distribution pipe line and providing Functional Household Tap Connection for Augmentation of Gobindapur water supply scheme in Swarupnagar Block under Barasat Division, P.H.E Dte. ORD/001007/2022-2023 170/BD 19/01/2023 858 KINGS & CO. 437.87 313.38 66
972 Barasat Division Formal work order for Laying of DI rising main, DI/UPVC distribution pipe line and providing Functional Household Tap Connection in connection with Augmentation of Padmapukuria water supply scheme (Zone-II), Minakhan Block under Hasnabad Sub-Division, PHE Dte. ORD/001008/2022-2023 171/BD 19/01/2023 90 M/S B.K.ENTERPRISE. 446.28 357.95 75
973 Barasat Division Acceptance cum work order for Restoration of roads under different water supply schemes of Baduria Block within Basirhat Sub-Division under Barasat Division P.H.E.Dte ORD/001008/2024-2025 3553/BD 16/12/2024 390 PRITAM MUKHOPADHYAY. 60.15 0.00 0
974 Barasat Division Formal work order for Laying of DI/UPVC distribution pipe line and providing Functional Household Tap Connection for Augmentation of Gobindapur Dhokra water supply scheme in Basirhat-II Block under Barasat Division, P.H.E Dte. ORD/001009/2022-2023 172/BD 19/01/2023 90 M/S MALLICK ENTERPRISE 373.91 373.72 100
975 Barasat Division Acceptance cum work order for Restoration of roads under different water supply schemes of Swarupnagar Block within Basirhat Sub-Division under Barasat Division P.H.E.Dte. ORD/001009/2024-2025 3625/BD 20/12/2024 90 PUSPA CONSTRUCTION. 57.26 0.00 0
976 Barasat Division Formal work order for Laying of DI/UPVC distribution pipe line and providing Functional Household Tap Connection for Augmentation of Paikardanga water supply scheme in Basirhat-I Block under Barasat Division, P.H.E Dte. ORD/001010/2022-2023 173/BD 19/01/2023 984 J.D.J.ENTERPRISE. (TRADERS PVT.LTD) 707.21 262.57 38
977 Barasat Division Acceptance cum work order for Restoration of roads under different water supply schemes of Basirhat II Block within Basirhat Sub-Division under Barasat Division P.H.E.Dte. ORD/001010/2024-2025 3554/BD 16/12/2024 30 M/S MAA TARA ENTERPRISE 29.52 0.00 0
978 Barasat Division Formal work order for Laying of DI/UPVC distribution pipe line and providing Functional Household Tap Connection for Augmentation of Rajendrapur water supply scheme in Basirhat-II Block under Barasat Division, P.H.E Dte. ORD/001012/2022-2023 174/BD 19/01/2023 799 EFFLUENT & WATERTREATMENT ENGINEERS (P) LTD. 376.42 326.51 70
979 Barasat Division Acceptance cum work order for Sinking of 1 (one) no. 300 mm. x 200 mm. dia. Tube well 250 mtr deep replacement T/W by D.R. Rig method with UPVC pipe & UPVC ribbed strainer for Augmentation of Kamlabas Water Supply Scheme (2nd T/W Site) under Bongaon Sub-Division, P.H.E. Dte. ORD/001012/2023-2024 2829/BD 15/09/2023 30 SAHA CONSTRUCTION & CO 16.14 13.46 100
980 Barasat Division Acceptance cum work order for Repair and renovation works of R.C.C. Elevated Reservoir of 456 cum for Krishnachandrapur Water Supply Scheme under Bongaon Sub-Division, PHE Dte. ORD/001013/2022-2023 189/BD 20/01/2023 30 TRISHA ENTERPRISE & CO. 19.03 18.97 100
981 Barasat Division Acceptance cum work order for Sinking of 2 (two) nos. 300 mm. x 200 mm. dia. Tube well 250 mtr deep Replacement Tube well by D.R. Rig method with UPVC pipe & UPVC ribbed strainer for Augmentation of Malidah Water Supply Scheme (H/W Site & 2nd T/W Site) under Bongaon Sub-Division, P.H.E. Dte. ORD/001013/2023-2024 2830/BD 15/09/2023 60 DHELA BABA ENTERPRISE 32.28 27.78 100
982 Barasat Division Acceptance cum work order for Sinking of 2 nos. 300 mm. x 200 mm. dia. Tube well 250 mtr deep by D.R. Rig method with UPVC pipe & UPVC ribbed strainer for Augmentation of Gadpukuria (Zone - II) Water Supply Scheme at H/W Site & 2nd T/W Site under Bongaon Sub-Division, P.H.E. Dte. ORD/001014/2023-2024 2831/BD 15/09/2023 60 B.M.ENGINEERING. & CONSTRUCTION. 32.24 27.49 100
983 Barasat Division Acceptance cum work order for Sinking of 1 (one) no. new 300 mm. x 200 mm. dia. 300 mtr deep Tubewell by D.R. Rig method with UPVC pipe & UPVC ribbed strainer for Garibpur Piped Water Supply Scheme at H/W Site under Bongaon Sub-Division, P.H.E. Dte. ORD/001015/2023-2024 2832/BD 15/09/2023 30 NADIA TUBEWELLS 21.56 15.59 100
984 Barasat Division Acceptance cum work order for Sinking of 3 nos. 300 mm. x 200 mm. dia. 360 mtr deep Tubewell by D.R. Rig method at Ph No.-1, 2 & 3 with PVC pipe & strainer having 300mm dia 48 mtr. long housing pipe & 200mm dia 30 mtr. long filter for Augmentation of Dakshin Bhebia w/s scheme (Z-I), Hasnabad block under Hasnabad Sub-Division, P.H.E. Dte. ORD/001016/2024-2025 3577/BD 18/12/2024 90 SRI KRISHNA CO-OP-LABOUR CONTRACT AND CONST SOC LTD. 77.52 6.46 68
985 Barasat Division Formal work order for Additional pipeline and other allied works as per revised LDS in connection with Augmentation of Swetpur-II Water Supply Scheme under JJM programme in Deganga block within Barasat Sub Division, P.H.E.Dte. ORD/001017/2024-2025 524/BD 17/02/2025 90 A.P POWER & CONCRETE 192.44 0.00 0
986 Barasat Division Acceptance cum work order for Emergent restoration of road for damage portion due to newly laid different dia DI/UPVC distribution pipe line at different places in connection with augmentation of Durgamandop w/s scheme, Sandeshkhali-II block under Hasnabad Sub-Division P.H.E. Dte. ORD/001018/2023-2024 1062/HSD 31/08/2023 10 ANKUSH CONSTRUCTION & CO. 0.97 0.97 100
987 Barasat Division Formal work order for Additional pipeline and other allied works as per revised LDS in connection with Augmentation of Nebhadui Duttapukur Z-II Water Supply Scheme under JJM programme in Barasat-I block within Barasat Sub Division, P.H.E.Dte. ORD/001018/2024-2025 3737/BD 27/12/2024 90 M/S B.K.ENTERPRISE. 100.40 0.00 0
988 Barasat Division Acceptance cum work order for Sinking of 1 (one) no. new 300 mm. x 200 mm. dia. 300 mtr deep Tube well by D.R. Rig method with UPVC pipe & UPVC ribbed strainer for Paschim Huda Piped Water Supply Scheme at H/W Site under Bongaon Sub-Division, P.H.E. Dte. ORD/001020/2023-2024 2833/BD 15/09/2023 30 NADIA TUBEWELLS 21.56 15.48 100
989 Barasat Division Continuation work Order for Hiring 1(One) No. Diesel Luxury Car on Daily basis. (for 6 (six) months from w.e.f. 01.12.2022) for the office use of the Assistant Engineer, Barasat Sub Division, P.H.E. Dte. @ Rs. 475.00 (Rupees four hundred & seventy five only) per day Excluding fuel. (From-01/12/2024 to 31/05/2025) ORD/001021/2024-2025 827/BSD 22/11/2024 181 MADHAB CHANDRA DAS 0.86 0.69 0
990 Barasat Division Acceptance cum work order for Land development at tube well site-1 within Nityabaria w/s scheme, Sandeshkhali-I under Hasnabad Sub-Division P.H.E. Dte. ORD/001025/2021-2022 13/HSD 04/01/2022 15 M/S DATTA ENTERPRISE. 4.93 4.87 1
991 Barasat Division Acceptance cum work order for Sinking of 2 nos. 300mm. x 200 mm. big dia 270 mtr deep Tube well by Direct Rotary Rig method using PVC pipe & strainer having 300 mm Dia 36 mtr. long Housing Pipe and 200 mm Dia 30 mtr. long filter for Augmentation of Joypur Gopmahal Water Supply Scheme in Basirhat - II Block of Basirhat Sub- Division under Barasat Division, PHE Dte. ORD/001024/2022-2023 206/BD 24/01/2023 30 MONDAL & CO. (BASIRHAT). 39.55 38.28 100
992 Barasat Division Acceptance cum work order for Sinking of Additional 1 nos. 300 mm. x 200 mm. dia. 360 mtr deep Tubewell by D.R. Rig method with PVC pipe & strainer having 300mm dia 48 mtr. long housing pipe & 200mm dia 30 mtr. long filter within Daudpur w/s scheme, Sandeshkhali-II block under Hasnabad Sub-Division, P.H.E. Dte. ORD/001025/2024-2025 3580/BD 18/12/2024 30 SUBHAJIT SAHA 31.69 0.00 0
993 Barasat Division Acceptance cum work order for Additional Laying of diff. dia. UPVC pipe line for Providing FHTC in connection with JJM and Jal Swapna at diff. places in Tongtala Mouza within Bouthakurani W/S scheme, Sandeshkhali-II block under Hasnabad Sub-Division within Barasat Division, PHE Dte. (Part-A) ORD/001026/2021-2022 14/HSD 04/01/2022 15 SRI KRISHNA CO-OP-LABOUR CONTRACT AND CONST SOC LTD. 4.91 0.00 1
994 Barasat Division Acceptance cum work order for Sinking of 1 nos. 300 mm. x 200 mm. dia. 360 mtr deep Tubewell by D.R. Rig method at Dhamakhali mouza with PVC pipe & strainer having 300mm dia 48 mtr. long housing pipe & 200mm dia 30 mtr. long filter within Rampur w/s scheme, Sandeshkhali-II block under Hasnabad Sub-Division, P.H.E. Dte. ORD/001026/2024-2025 3583/BD 18/12/2024 30 TITUMIR INTERNATIONAL 25.86 0.00 0
995 Barasat Division Acceptance cum work order for Land development at tube well site-2 within Nityabaria w/s scheme, Sandeshkhali-I under Hasnabad Sub-Division P.H.E. Dte. ORD/001027/2021-2022 15/HSD 04/01/2022 10 M/S PROGATI ENTERPRISE. 1.59 1.59 1
996 Barasat Division Acceptance cum work order for Additional Laying of diff. dia. UPVC pipe line for Providing FHTC in connection with JJM and Jal Swapna at diff. places in Tongtala Mouza within Bouthakurani W/S scheme, Sandeshkhali-II block under Hasnabad Sub-Division within Barasat Division, PHE Dte. (Part-B) ORD/001028/2021-2022 16/HSD 04/01/2022 15 SRI KRISHNA CO-OP-LABOUR CONTRACT AND CONST SOC LTD. 4.91 4.91 1
997 Barasat Division Formal work order for Laying of DI/UPVC distribution pipe line and Providing Functional House Hold Tap Connection (FHTC) for Augmentation of Kola Water Supply Scheme, under Bongaon Sub-Division, PHE Dte. ORD/001029/2022-2023 264/BD 01/02/2023 90 MONDAL PRECISION PVT.LTD 330.92 326.52 100
998 Barasat Division Acceptance cum work order for Additional Laying of diff. dia. UPVC pipe line for Providing FHTC in connection with JJM and Jal Swapna at diff. places in Bouthakurani Mouza within Bouthakurani W/S scheme, Sandeshkhali-II block under Hasnabad Sub-Division within Barasat Division, PHE Dte. (Part-A) ORD/001030/2021-2022 18/HSD 04/01/2022 15 SRI KRISHNA CO-OP-LABOUR CONTRACT AND CONST SOC LTD. 4.90 4.90 1
999 Barasat Division Acceptance cum work order for Additional Laying of diff. dia. UPVC pipe line for Providing FHTC in connection with JJM and Jal Swapna at diff. places in Bouthakurani Mouza within Bouthakurani W/S scheme, Sandeshkhali-II block under Hasnabad Sub-Division within Barasat Division, PHE Dte. (Part-B) ORD/001032/2021-2022 20/HSD 04/01/2022 15 SRI KRISHNA CO-OP-LABOUR CONTRACT AND CONST SOC LTD. 4.91 4.91 1
1000 Barasat Division Formal work order for Additional Laying of UPVC distribution pipe line and Providing Functional Household Tap Connection for the leftout portion with protection work in connection with Augmentation of Dakshin Bhebia water supply scheme (Z-II), Hasnabad Block under Hasnabad Sub-Division, PHE Dte. ORD/001032/2024-2025 3623/BD 20/12/2024 180 H.I.ENTERPRISE. 178.87 0.00 50
1001 Barasat Division Formal work order for Protection of different dia. UPVC pipeline by UC bullah & Bamboo pile at diff. places and emergent restoration of road at HW site in Debitala w/s scheme, Minakhan block under Hasnabad Sub- Division P.H.E. Dte. ORD/001034/2024-2025 3624/BD 20/12/2024 180 SRI KRISHNA CO-OP-LABOUR CONTRACT AND CONST SOC LTD. 147.18 0.00 85
1002 Barasat Division Acceptance cum work order for Additional Laying of diff. dia. UPVC pipe line for Providing FHTC in connection with JJM and Jal Swapna at diff. places in Dholkhali Mouza within Bouthakurani W/S scheme, Sandeshkhali-II block under Hasnabad Sub-Division within Barasat Division, PHE Dte. (Part-A) ORD/001035/2021-2022 22/HSD 04/01/2022 15 SRI KRISHNA CO-OP-LABOUR CONTRACT AND CONST SOC LTD. 4.90 4.90 1
1003 Barasat Division Hiring of an Additional Vehicle (Diesel) for the site inspection of different Bongaon ongoing schemes under JJM Program at Bongaon Sub-Division, P.H.E.Dte. (Period from:-01/09/2024 to 28/02/ 2025) ORD/001035/2024-2025 1076/Bon 30/08/2024 182 PRIYAM ENTERPRISE 0.86 1.75 0
1004 Barasat Division Acceptance cum work order for Restoration of roads under different water supply schemes of Basirhat I Block under Barasat Division P.H.E.Dte. ORD/001036/2024-2025 3626/BD 20/12/2024 180 NISHITH BANERJEE 45.36 0.00 100
1005 Barasat Division Acceptance cum work order for Additional Laying of diff. dia. UPVC pipe line for Providing FHTC in connection with JJM and Jal Swapna at diff. places in Dholkhali Mouza within Bouthakurani W/S scheme, Sandeshkhali-II block under Hasnabad Sub-Division within Barasat Division, PHE Dte. (Part-B) ORD/001037/2021-2022 24/HSD 04/01/2022 15 SRI KRISHNA CO-OP-LABOUR CONTRACT AND CONST SOC LTD. 4.91 4.91 1
1006 Barasat Division Acceptance cum work order for Construction of Boundary Wall at the Head Work site of Sangrampur Water Supply Scheme under Basirhat Sub-Division within Barasat Division, P.H.E. Dte. ORD/001037/2024-2025 59/BD 07/01/2025 210 IKBAL HOSSAIN 18.27 0.00 40
1007 Barasat Division Acceptance cum work order for Construction of Boundary Wall at the site of Pump House 1 of Dakshin Bagundi Water Supply Scheme under Basirhat Sub-Division within Barasat Division, P.H.E. Dte. ORD/001038/2024-2025 3701/BD 26/12/2024 180 JEET ENTERPRISE. 7.96 0.00 0
1008 Barasat Division Acceptance cum work order for Sinking of 1 No. 360.00 mtr. Deep 100 X 40 mm. dia. trial-cum-production Tube well fitted with Indian Mark - II pump with PVC pipe & strainers at T/W site-1 for Nityabaria w/s scheme, Sandeshkhali-I block under Hasnabad Sub-Division, P.H.E. Dte. ORD/001039/2021-2022 25/HSD 04/01/2022 15 GOBINDA DAS. 3.14 2.70 1
1009 Barasat Division Acceptance cum work order for Construction of Boundary Wall at the site of Pump House -III of Gobindapur Water Supply Scheme under Basirhat Sub-Division within Barasat Division, P.H.E. Dte. ORD/001039/2024-2025 58/BD 07/01/2025 120 IKBAL HOSSAIN 14.35 0.00 60
1010 Barasat Division Acceptance cum work order for Additional Laying of diff. dia. UPVC pipe line for Providing FHTC in connection with JJM and Jal Swapna at diff. places in Dholkhali Mouza within Bouthakurani W/S scheme, Sandeshkhali-II block under Hasnabad Sub-Division within Barasat Division, PHE Dte. (Part-C) ORD/001040/2021-2022 26/HSD 04/01/2022 15 SRI KRISHNA CO-OP-LABOUR CONTRACT AND CONST SOC LTD. 4.79 4.76 1
1011 Barasat Division Formal work order for Repairing & renovation of existing AIRP capacity 54m3/hr for Augmentation of Ashariya Narayanpur w/s scheme, Hasnabad block under Hasnabad Sub-Division P.H.E. Dte. ORD/001040/2024-2025 3713/BD 26/12/2024 180 WIST WATER SOLUTIONS PVT. LTD. 57.54 0.00 0
1012 Barasat Division Acceptance cum work order for Sinking of 1 No. 360.00 mtr. Deep 100 X 40 mm. dia. trial-cum-production Tube well fitted with Indian Mark - II pump with PVC pipe & strainers at T/W site-2 for Nityabaria w/s scheme, Sandeshkhali-I block under Hasnabad Sub-Division, P.H.E. Dte. ORD/001041/2021-2022 27/HSD 04/01/2022 15 M/S GHOSH CONSTRUCTION. 3.14 2.58 1
1013 Barasat Division Acceptance cum work order for Construction of Boundary wall at Berachampa Zone - V 1st Tubewell site at Kaukepara Mouza within Deganga Block under Barasat Sub-Division, PHE Dte. ORD/001041/2024-2025 3702/BD 26/12/2024 30 DEBAPRASAD MONDAL. 27.57 0.00 0
1014 Barasat Division Acceptance cum work order for Providing Functional Household Tap Connection (FHTC) to the uncovered household as well as convert the mouzas into Swajal Gram with laying of UPVC pipe line, Tube Well connection and pipe protection work under Augmentation work at Kamalabas W/S Scheme Bagdah block within the jurisdiction of Bongaon Sub-Division under Barasat Division, P.H.E. Dte. ORD/001042/2024-2025 3620/BD 20/12/2024 150 MONDAL & CO.(BON) 10.13 0.00 100
1015 Barasat Division Acceptance cum work order for Construction of Boundary Wall in Hosenpur Mouza Water Supply Scheme at Berachampa Zone - I within Deganga Block under Barasat Sub-Division, PHE Dte. ORD/001043/2024-2025 56/BD 07/01/2025 120 JIT CONSTRUCTION 27.29 0.00 40
1016 Barasat Division Acceptance cum work order for Construction of Boundary wall at Sohai Swetpur Zone-I within Deganga Block under Barasat Sub-Division, PHE Dte. ORD/001044/2024-2025 3703/BD 26/12/2024 30 GIRIDHARI DAS 12.80 0.00 0
1017 Barasat Division Acceptance cum work order for Additional Laying of UPVC pipe line and allied work in connection with Augmentation Deara Water Supply Scheme within Barasat Sub Division, P.H.E.Dte. ORD/001048/2024-2025 53/BD 07/01/2025 30 SINGHA ROY & CO. 27.35 0.00 0
1018 Barasat Division Repairing & renovation of Compressor Room for Iron Elimination Plant under Augmentation of Kurulia (Zone-I) Water Supply Scheme within the jurisdiction of Bongaon Sub-Division under Barasat Division, P.H.E. Dte. ORD/001049/2023-2024 643/Bon 14/08/2023 21 M/S SAYAN ENTERPRISE. 1.59 1.57 100
1019 Barasat Division Acceptance cum work order for Additional Laying of HDPE pipe line and allied work in connection with Augmentation Berachampa Zone-I Water Supply Scheme within Barasat Sub Division, P.H.E.Dte. ORD/001049/2024-2025 54/BD 07/01/2025 30 MONDAL ENTERPRISE. (BARASAT) 36.88 0.00 0
1020 Barasat Division Acceptance cum work order for Additional Laying of UPVC pipe line and allied work in connection with Augmentation Matiagachha Water Supply Scheme within Barasat Sub Division, P.H.E.Dte. ORD/001050/2024-2025 57/BD 07/01/2025 30 MITRA CONSTRUCTION 37.61 0.00 0
1021 Barasat Division Formal work order for Providing Functional Household Tap Connection (FHTC) to the uncovered household as well as convert the mouzas into Swajal Gram including laying of UPVC pipe line under Augmentation work at Ghatpatila (Zone - II) W/S Scheme Bagdah block within the jurisdiction of Bongaon Sub-Division under Barasat Division, P.H.E. Dte. ORD/001051/2024-2025 3736/BD 27/12/2024 180 PATHIK PABAN NANDI 120.24 0.00 80
1022 Barasat Division Repairing and renovation of Boundary wall, Pump House and construction of Approach Road at 2nd Tube Well site for Augmentation of Kurulia (Zone-II) Water Supply Scheme, Bagdah Block within the jurisdiction of Bongaon Sub-Division under Barasat Division, P.H.E. Dte. ORD/001055/2024-2025 1081/Bon 02/09/2024 15 M/S SAYAN ENTERPRISE. 4.38 0.00 0
1023 Barasat Division Formal work order for Additional laying of 160 mm dia. HDPE pipe line from old pump house no- 3 to near Putimari Ghat, protection works & other allied works within Kalinagar w/s scheme (Z-II), Sandeshkhali-I Block under Hasnabad Sub- Division P.H.E. Dte. ORD/001056/2024-2025 3714/BD 26/12/2024 180 M/S JAYDEEP DASGUPTA 151.37 0.00 35
1024 Barasat Division Acceptance cum work order for Electrocoagulation Based Package Surface Water based Water Supply Scheme (Solar Power) in Minakhan Block, North 24 Parganas District of Barasat Division, P.H.E. Dte. ORD/001064/2022-2023 407/BD 09/02/2023 30 CARBON SERVICES INDIA 45.12 35.83 0
1025 Barasat Division Construction of Approach Road at 2ndT/W site for Augmentation of Kurulia (Zone-I) Water Supply Scheme within the jurisdiction of Bongaon Sub-Division under Barasat Division, P.H.E.Dte. ORD/001065/2023-2024 558/Bon 18/07/2023 15 ROY ENGINEERS. 0.93 0.92 100
1026 Barasat Division Hiring of an Additional Vehicle (Diesel) for the site inspection of different ongoing schemes under JJM Program at Bongaon Sub-Division, P.H.E.Dte. period from 01.07.2024 to 31.08.2024. ORD/001065/2024-2025 801/Bon 28/06/2024 61 VAI ENTERPRISE. 0.29 0.59 0
1027 Barasat Division Formal work order for Laying of DI rising main, DI/UPVC distribution pipe line and Providing Functional Household Tap Connection in Connection with Augmentation of Chandpur water supply scheme (Zone-II), Hasnabad Block under Hasnabad Sub-Division, P.H.E. Dte. ORD/001066/2022-2023 402/BD 09/02/2023 90 MONDAL & CO. (BASIRHAT). 318.72 300.51 60
1028 Barasat Division Formal work order for Construction of 350 cum capacity 20 mtr staging height R.C.C Over Head water Reservoir as per Departmental design, drawing and specification including bored pile & pile cap for Augmentation of Malancha water supply scheme (Z-II), Minakhan Block under Hasnabad Sub-Division, PHE Dte. under Barasat Division, PHE Dte. ORD/001066/2023-2024 2863/BD 20/09/2023 365 M/S B.K.ENTERPRISE. 152.47 48.24 75
1029 Barasat Division Acceptance cum work Order for Providing Functional Household Tap Connection (FHTC) in Baunia Abad mouza including laying of UPVC/PVC pipe & supply of necessary fittings within Baunia Abad w/s scheme, Sandeshkhali-I block under Hasnabad Sub-Division, PHE Dte. (Phase-I) ORD/001068/2021-2022 93/BD 17/01/2022 45 M/S PROGATI ENTERPRISE. 77.75 77.77 1
1030 Barasat Division Formal work order for Laying of DI rising main, DI/UPVC distribution pipe line and Providing Functional Household Tap Connection in Connection with Augmentation of Rupmari water supply scheme (Zone-I), Hingalganj Block under Hasnabad Sub-Division, P.H.E. Dte. ORD/001068/2022-2023 403/BD 09/02/2023 90 M/S DATTA ENTERPRISE. 348.91 342.66 85
1031 Barasat Division Acceptance cum work Order for Providing Functional Household Tap Connection (FHTC) in diff. mouza including laying of UPVC/PVC pipe & supply of necessary fittings within Kalitala W/S scheme, Hingalganj block under Hasnabad Sub-Division, PHE Dte. (Phase-I) ORD/001070/2021-2022 94/BD 17/01/2022 45 MONDAL & CO. (BASIRHAT). 80.01 79.76 1
1032 Barasat Division Formal work order for Laying of DI rising main, DI/UPVC distribution pipe line and Providing Functional Household Tap Connection in Connection with Augmentation of Mohanpur water supply scheme (Zone-I), Hasnabad Block under Hasnabad Sub-Division, P.H.E. Dte. ORD/001070/2022-2023 401/BD 09/02/2023 90 M/S PROGATI ENTERPRISE. 306.25 293.07 1
1033 Barasat Division Acceptance cum work Order for Providing Functional Household Tap Connection (FHTC) in Rupmari & Bastali mouza including laying of UPVC/PVC pipe & supply of necessary fittings within Rupmari W/S scheme, Hingalganj block under Hasnabad Sub-Division, PHE Dte. ORD/001074/2021-2022 95/BD 17/01/2022 45 M/S DATTA ENTERPRISE. 96.84 96.43 1
1034 Barasat Division Continuation order for Hiring of one no. DIESEL MOTOR CAB (BS-IV) on daily hire basis for use of the Assistant Engineer, HASNABAD SUB-DIVISION, PHE DTE. Period from 01.10.21 to 30.09.22. ORD/001081/2021-2022 1617/HSD 29/09/2021 365 SUSMITA MANDAL. 1.72 3.75 1
1035 Barasat Division Formal work order for Providing Functional Household Tap Connection(FHTC) from existing and new proposed distribution system within the command area under BAJITPUR ZONE-I Water Supply Scheme at Baduria Block, District- North 24 Parganas under Barasat Division,PHE Dte. (Phase-I) ORD/001082/2021-2022 141/BD 18/01/2022 90 ALOK ENTERPRSE. (A UNIT OF SAKET TREXIM PVT.LTD) 266.04 179.15 1
1036 Barasat Division Formal work order for Providing Functional Household Tap Connection (FHTC) in Mamudpur & Hingalganj mouza including laying of UPVC/PVC pipe & supply of necessary fittings within Hingalganj w/s scheme (Zone-I), Hingalganj block under Hasnabad Sub-Division, PHE Dte. ORD/001087/2021-2022 142/BD 18/01/2022 90 M/S S.S.ENTERPRISE. (SOUTH) 390.88 350.49 1
1037 Barasat Division Formal work order for Construction of 300 cum capacity 20 mtr staging height R.C.C Over Head Reservoir as per Deptt. design, drawing & specification including bored pile with pile cap for Augmentation of Durgapur Baylani water supply scheme (Zone-II), Hingalganj Block under Hasnabad Sub-Division, PHE Dte. ORD/001095/2023-2024 3021/BD 05/10/2023 365 ABDUL ALIM MONDAL. 122.76 119.89 100
1038 Barasat Division Formal work order for Construction of 500 cum capacity 20 mtr staging height R.C.C Over Head Reservoir as per Deptt. design, drawing & specification including bored pile with pile cap in connection with Augmentation of Chandpur water supply scheme (Zone-II), Hasnabad Block under Hasnabad Sub-Division, PHE Dte. ORD/001096/2023-2024 2866/BD 20/09/2023 365 MONDAL & CO. (BASIRHAT). 202.58 192.31 75
1039 Barasat Division Formal work order for Construction of 350 cum capacity 20 mtr staging height R.C.C Over Head water Reservoir as per Departmental design, drawing and specification including bored pile & pile cap for Augmentation of Malancha water supply scheme (Z-I), Minakhan Block under Hasnabad Sub-Division, PHE Dte. under Barasat Division, PHE Dte. ORD/001099/2023-2024 2886/BD 20/09/2023 365 S.S.ENTERPRISE. (BAMANGACHI) 152.49 141.63 100
1040 Barasat Division Different works in connection with Augmentation Bodai Zone-II PWSS (1st Tubewell - Pump House). ORD/001099/2024-2025 1002/BSD 02/01/2025 20 M/S DAS & CO. 3.93 0.00 0
1041 Barasat Division Different works in connection with Augmentation Bodai Zone-II PWSS (1st Tubewell - Boundary Wall). ORD/001101/2024-2025 1003/BSD 02/01/2025 20 K.D ENTERPRISE. 2.36 0.00 0
1042 Barasat Division Different works in connection with Augmentation Nebadhui Duttapukur Zone-II PWSS (1st Tubewell - Pump House). ORD/001103/2024-2025 1005/BSD 02/01/2025 20 ROMI TREDERS. 3.89 0.00 0
1043 Barasat Division Acceptance cum work order for Providing Functional Household Tap Connection (FHTC) in connection with Jal Jeevan Mission (JJM and JAL SWAPNA) under command area of KONIARA Water Supply Scheme at Bagdah Block under Barasat Division, PHE Dte. (Phase-I) ORD/001105/2021-2022 164/BD 19/01/2022 30 ROY CHOWDHURY CONSTRUCTION. 35.78 35.74 1
1044 Barasat Division Acceptance cum work order for Sinking of 1 Nos. 300.00 mtr. Deep 100 X 50 mm. dia. Trial-cum-production Tube well fitted with Indian Mark - II pump with PVC pipe & strainers at T/W site-1 for Kachurhula w/s scheme (Zone-II), Minakhan block under Hasnabad Sub-Division, P.H.E. Dte. ORD/001105/2023-2024 1190/HSD 22/09/2023 10 ROY CHOWDHURY CONSTRUCTION. 2.63 1.76 100
1045 Barasat Division Different works in connection with Augmentation Nebadhui Duttapukur Zone-II PWSS (1st Tubewell - Boundary Wall & Service Road). ORD/001105/2024-2025 1006/BSD 02/01/2025 20 SONALI CONSTRUCTION 2.55 0.00 0
1046 Barasat Division Acceptance cum work order for Sinking of 1 (one) no. 300 mm. x 200 mm. dia. Tube well 250 mtr deep Replacement Tube well by D.R. Rig method with UPVC pipe & UPVC ribbed strainer for Augmentation of Diara Water Supply Scheme (2nd T/W Site) within the Jurisdiction of Bongaon Sub-Division, under Barasat Division, P.H.E. Dte. ORD/001107/2023-2024 2920/BD 26/09/2023 30 B.M.ENGINEERING. & CONSTRUCTION. 16.12 13.79 100
1047 Barasat Division Acceptance cum work order for Sinking of 1 (one) no. 300 mm. x 200 mm. dia. Tube well 250 mtr deep Replacement Tubewell by D.R. Rig method with UPVC pipe & UPVC ribbed strainer for Augmentation of Sindrani (Zone - II) Water Supply Scheme (H/W Site) within the Jurisdiction of Bongaon Sub-Division, under Barasat Division, P.H.E. Dte. ORD/001109/2023-2024 2922/BD 26/09/2023 30 B.M.ENGINEERING. & CONSTRUCTION. 16.10 14.08 100
1048 Barasat Division Acceptance cum work order for Sinking of 1 (one) no. 300 mm. x 200 mm. dia. Tube well 250 mtr deep Replacement Tubewell by D.R. Rig method with UPVC pipe & UPVC ribbed strainer for Augmentation of Chauberia Water Supply Scheme (H/W Site) within the Jurisdiction of Bongaon Sub-Division, under Barasat Division, P.H.E. Dte ORD/001110/2023-2024 2923/BD 26/09/2023 30 SAHA CONSTRUCTION & CO 16.14 13.72 100
1049 Barasat Division Acceptance cum work order for Additional Laying of diff. dia. UPVC pipe line for Providing FHTC in connection with JJM and Jal Swapna at diff. places in Tongtala Mouza within Bouthakurani W/S scheme, Sandeshkhali-II block under Hasnabad Sub-Division within Barasat Division, PHE Dte. (Part-A) ORD/001111/2021-2022 14/HSD 04/01/2022 15 SRI KRISHNA CO-OP-LABOUR CONTRACT AND CONST SOC LTD. 4.91 4.91 1
1050 Barasat Division Acceptance cum work order for Sinking of 2 (two) no. 300 mm. x 200 mm. dia. Tube well 250 mtr deep Replacement Tube well by D.R. Rig method with UPVC pipe & UPVC ribbed strainer for Augmentation of Kalupur Water Supply Scheme (H/W Site & 2nd T/W Site) within the Jurisdiction of Bongaon Sub-Division, under Barasat Division, P.H.E. Dte. ORD/001111/2023-2024 2924/BD 26/09/2023 60 SAHA CONSTRUCTION & CO 32.29 25.26 100
1051 Barasat Division Acceptance cum work order for Providing Functional Household Tap Connection (FHTC) in Fakirtakia mouza including laying of UPVC/PVC pipe & supply of necessary fittings within Fakirtakia w/s scheme, Sandeshkhali-I Block under Hasnabad Sub-Division, PHE Dte. (Phase-I) ORD/001113/2021-2022 180/BD 20/01/2022 45 R.K.MANDAL AND CO. 74.88 74.79 1
1052 Barasat Division Acceptance cum work order for Sinking of 1 (one) no. 300 mm. x 200 mm. dia. Tube well 250 mtr deep Replacement Tubewell by D.R. Rig method with UPVC pipe & UPVC ribbed strainer for Augmentation of Shimulpur Water Supply Scheme (2nd T/W Site) within the Jurisdiction of Bongaon Sub-Division, under Barasat Division, P.H.E. Dte ORD/001113/2023-2024 2936/BD 27/09/2023 442 JOY GURU ENTERPRISE 16.12 5.24 100
1053 Barasat Division Route Survey, Design Drawing & DPR Preparation for Bagdah Water Supply Scheme under Bongaon Sub-Division, under Barasat Division,PHE.Dte. ORD/001114/2021-2022 608/Bon 31/12/2021 20 UMWELT ENGINEER PVT.LTD. 4.27 4.27 1
1054 Barasat Division Acceptance cum work order for Sinking of 1 (one) no. 300 mm. x 200 mm. dia. Tube well 250 mtr deep Replacement Tubewell by D.R. Rig method with UPVC pipe & UPVC ribbed strainer for Augmentation of Chandpara Water Supply Scheme (H/W Site) under Bongaon Sub-Division, P.H.E. Dte. ORD/001114/2023-2024 2937/BD 27/09/2023 30 JOY GURU ENTERPRISE 16.12 14.88 100
1055 Barasat Division Acceptance cum work order for Sinking of 1 (one) no. 300 mm. x 200 mm. dia. Tube well 250 mtr deep Replacement Tube well by D.R. Rig method with UPVC pipe & UPVC ribbed strainer for Augmentation of Kola Water Supply Scheme (H/W Site) within the Jurisdiction of Bongaon Sub-Division, under Barasat Division, P.H.E.Dte. ORD/001115/2023-2024 2938/BD 27/09/2023 30 JOY GURU ENTERPRISE 16.12 15.11 100
1056 Barasat Division Route Survey, Design Drawing & DPR Preparation for Sindrani (Zone-II) Water Supply Scheme under Bongaon Sub-Division, under Barasat Division, PHE.Dte. ORD/001116/2021-2022 610/Bon 31/12/2021 20 UMWELT ENGINEER PVT.LTD. 3.48 3.48 1
1057 Barasat Division Acceptance cum work order for Sinking of 1 (one) no. 300 mm. x 200 mm. dia. 250 mtr deep Replacement Tubewell by D.R. Rig method with UPVC pipe & UPVC ribbed strainer for Augmentation of Hariharpur Water Supply Scheme (H/W Site)within the jurisdiction of BongaonSub-Division, under Barasat Division, P.H.E. Dte. ORD/001116/2023-2024 2939/BD 27/09/2023 30 JOY GURU ENTERPRISE 16.11 15.08 100
1058 Barasat Division Route Survey, Design Drawing & DPR Preparation for Gangrapota Water Supply Scheme under Bongaon Sub-Division, under Barasat Division, PHE.Dte. ORD/001117/2021-2022 611/Bon 31/12/2021 20 SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. 4.12 4.10 1
1059 Barasat Division Acceptance cum work order for Sinking of 2 (two) no. 300 mm. x 200 mm. dia.250 mtr deep Replacement Tubewell by D.R. Rig method with UPVC pipe & UPVC ribbed strainer for Augmentation of Helencha Water Supply Scheme (H/W Site & 2nd T/W Site) under Bongaon Sub-Division, P.H.E. Dte. ORD/001117/2023-2024 2941/BD 27/09/2023 60 JOY GURU ENTERPRISE 32.22 26.95 100
1060 Barasat Division Route Survey, Design Drawing & DPR Preparation for Krishnachandrapur Water Supply Scheme under Bongaon Sub-Division, under Barasat Division, PHE.Dte. ORD/001118/2021-2022 612/Bon 31/12/2021 20 SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. 4.09 4.07 1
1061 Barasat Division Route Survey, Design Drawing & DPR Preparation for Panchita Water Supply Scheme under Bongaon Sub-Division, under Barasat Division,PHE.Dte. ORD/001119/2021-2022 613/Bon 31/12/2021 20 SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. 3.80 3.80 1
1062 Barasat Division Formal work order for Laying of DI/UPVC distribution pipe line and providing Functional Household Tap Connection for Augmentation of Itinda Panitor water supply scheme in Basirhat-I Block under Barasat Division, P.H.E Dte. ORD/001119/2022-2023 429/BD 13/02/2023 959 ALOK ENTERPRSE. (A UNIT OF SAKET TREXIM PVT.LTD) 662.31 182.01 24
1063 Barasat Division Acceptance cum work order for Providing Functional Household Tap Connection (FHTC) in connection with Jal Jeevan Mission (JJM and JAL SWAPNA) under command area of TALSA Water Supply Scheme at Habra - II Block under Barasat Division, PHE Dte. (Phase - I) ORD/001120/2021-2022 181/BD 20/01/2022 45 CHANDA CONSTRUCTION. 71.19 69.88 1
1064 Barasat Division Formal work order for Laying of DI rising main, DI/UPVC distribution pipe line and providing Functional Household Tap Connection for Augmentation of Rupmari (Zone-II water supply scheme, Hingalganj Block under Hasnabad Sub-Division, PHE Dte. ORD/001120/2022-2023 405/BD 09/02/2023 90 M/S NIRMAN CONSTRUCTION. 345.89 343.44 1
1065 Barasat Division Acceptance cum work order for Providing Functional Household Tap Connection (FHTC) in connection with Jal Jeevan Mission (JJM and JAL SWAPNA) under command area of Gopalpur Chandigarh Mouza (Part-I), and Dariala, Birpur, Banspol mouzas within Humaipur Water Supply Scheme at Barasat II Block under Barasat Division, PHE Dte. Part-A(Phase-II). ORD/001121/2021-2022 182/BD 20/01/2022 45 MONDAL ENTERPRISE. (BARASAT) 88.28 86.90 1
1066 Barasat Division Formal work order for Laying of DI rising main, DI/UPVC distribution pipe line and Providing Functional Household Tap Connection in Connection with Augmentation of Mohanpur water supply scheme (Zone-II), Minakhan Block under Hasnabad Sub-Division, P.H.E. Dte. ORD/001121/2022-2023 404/BD 09/02/2023 90 SRI KRISHNA CO-OP-LABOUR CONTRACT AND CONST SOC LTD. 283.51 257.49 1
1067 Barasat Division Hiring 1(One) No. Diesel Luxury Car on Daily basis. (for six months from w.e.f. 01.12.2022) for the office use of the Assistant Engineer, Barasat Sub Division, P.H.E. Dte. ORD/001123/2022-2023 804/BSD 30/11/2022 182 MADHAB CHANDRA DAS 0.86 0.26 1
1068 Barasat Division Formal work order for Additional Laying of UPVC distribution pipe line, protection works & other allied works within Jhikra w/s scheme, Minakhan Block under Hasnabad Sub-Division, PHE Dte. ORD/001125/2024-2025 114/BD 10/01/2025 180 M/S NIRMAN CONSTRUCTION. 174.75 29.60 80
1069 Barasat Division Formal work order for Laying of DI rising main, DI/UPVC distribution pipe line and providing Functional Household Tap Connection in connection with Augmentation of Chaital water supply scheme, Minakhan Block under Hasnabad Sub-Division, PHE Dte. ORD/001135/2022-2023 517/BD 20/02/2023 90 M/S B.K.ENTERPRISE. 372.13 351.13 100
1070 Barasat Division Formal work order for Laying of DI rising main, DI/UPVC distribution pipe line and providing Functional Household Tap Connection in connection with Augmentation of Kanaikati Kathalberia water supply scheme (Zone-II), Hingalganj Block under Hasnabad Sub-Division, PHE Dte. ORD/001136/2022-2023 516/BD 20/02/2023 811 KINGS & CO. 434.98 396.75 100
1071 Barasat Division Acceptance cum work order for for protection works for newly laid different dia. UPVC/DI pipe line at different. places in Mamudpur mouza for Hingalganj w/s scheme (Zone-I), Hingalganj block under Hasnabad Sub-Division P.H.E. Dte. ORD/001137/2021-2022 232/BD 25/01/2022 30 MONDAL & CO. (BASIRHAT). 31.20 31.43 1
1072 Barasat Division Formal work order for Laying of UPVC Distribution system pipe line and Providing FHTC (Functional Household Tap Connection ) by augmentation for Debhog water supply scheme in Basirhat-I block under Barasat Division, PHE Dte. ORD/001137/2022-2023 518/BD 20/02/2023 773 UTPAL CONSTRUCTION & CO. 301.59 202.41 80
1073 Barasat Division Acceptance cum work order for Sinking of 1 (one) no. 300 mm. x 200 mm. dia. 250 mtr deep Replacement Tubewell by D.R. Rig method with UPVC pipe & UPVC ribbed strainer for Augmentation of Matiagacha Water Supply Scheme (2nd T/W Site) under Bongaon Sub-Division, P.H.E. Dte. ORD/001137/2023-2024 2942/BD 27/09/2023 30 JOY GURU ENTERPRISE 16.12 11.91 100
1074 Barasat Division Continuation work order for Hiring 1(one) no. Diesel Luxary Car on daily basis (for 01.01.2023 to 30.04.2023) for office use of the Assistant Engineer, R.W.S Barasat Sub-Division, P.H.E. Dte. ORD/001138/2022-2023 883/BST 28/12/2022 120 DEBAPRASAD MONDAL. 0.57 0.95 1
1075 Barasat Division Formal work order for for Providing Functional Household Tap Connection(FHTC) from existing and new proposed distribution system within the command area of Banglani Water Supply Scheme at Swarupnagar Block under Barasat Division, PHE Dte. (Phase - I) ORD/001139/2021-2022 217/BD 24/01/2022 90 JAL PRAVAHIKA PVT. LTD. 221.85 168.02 1
1076 Barasat Division Acceptance cum work order for Providing Functional Household Tap Connection(FHTC) from existing and new proposed distribution system within the command area of Pifa Water Supply Scheme at Basirhat - I Block under Barasat Division, PHE Dte. (Phase - I) ORD/001140/2021-2022 221/BD 24/01/2022 45 M/S ANUBHAB CONSTRUCTION. 68.51 67.86 1
1077 Barasat Division Formal work order for Laying of DI/UPVC distribution pipe line and providing Functional Household Tap Connection for Augmentation of Nabatkati water supply scheme in Swarupnagar Block under Barasat Division, P.H.E Dte. ORD/001140/2022-2023 513/BD 20/02/2023 824 UTPAL CONSTRUCTION & CO. 285.35 208.83 60
1078 Barasat Division Formal work order for Laying of DI/UPVC distribution pipe line and providing Functional Household Tap Connection for Augmentation of Nityananda Kati Balti water supply scheme in Swarupnagar Block under Barasat Division, P.H.E Dte. ORD/001141/2022-2023 514/BD 20/02/2023 766 UTPAL CONSTRUCTION & CO. 272.40 223.13 52
1079 Barasat Division Acceptance cum work order for Providing Functional Household Tap Connection(FHTC) from existing and new proposed distribution system within the command area of Debog Water Supply Scheme at Basirhat - I Block under Barasat Division, PHE Dte. (Phase - I) ORD/001143/2021-2022 222/BD 24/01/2022 45 J.D.J.ENTERPRISE. (TRADERS PVT.LTD) 91.48 35.12 1
1080 Barasat Division Acceptance cum work order for Construction of boundary wall with RCC column structure at Pump House No.-2 within Rampur w/s scheme, Sandeshkhali-II block under Hasnabad Sub- Division P.H.E. Dte. (Part-A) ORD/001144/2022-2023 771/HSD 13/05/2022 21 BASIRHAT ANCHALICK SHARAMICK THIKADARY SAMABAY SAMITY LTD. 4.77 4.17 1
1081 Barasat Division Acceptance cum work order for Construction of boundary wall with RCC column structure at Pump House No.-2 within Rampur w/s scheme, Sandeshkhali-II block under Hasnabad Sub- Division P.H.E. Dte. (Part-B) ORD/001145/2022-2023 772/HSD 13/05/2022 21 BASIRHAT ANCHALICK SHARAMICK THIKADARY SAMABAY SAMITY LTD. 1.75 1.70 1
1082 Barasat Division Continuation order for one motor launch (M.V. JOYMAKALI) on daily hire basis for use of Hasnabad Sub-Division, P.H.E. Dte. Period : 01.03.23 to 31.08.23 = 184 days. ORD/001146/2022-2023 0255/HSD 28/02/2023 184 SUSMITA MANDAL. 2.74 8.46 100
1083 Barasat Division Acceptance cum work order for for protection works for newly laid different dia. UPVC/DI pipe line at different. places in Hingalganj mouza for Hingalganj w/s scheme (Zone-I), Hingalganj block under Hasnabad Sub-Division P.H.E. Dte. ORD/001147/2021-2022 235/BD 25/01/2022 15 MONDAL & CO. (BASIRHAT). 18.36 18.36 1
1084 Barasat Division Formal work order for Laying of DI rising main, DI/UPVC distribution pipe line and providing Functional Household Tap Connection in connection with Augmentation of Kalitala water supply scheme (Zone-I), Hingalganj Block under Hasnabad Sub-Division, PHE Dte. ORD/001148/2022-2023 654/BD 28/02/2023 90 SUPRITI ENTERPRISE. 610.10 591.61 60
1085 Barasat Division Acceptance cum work order for Sinking of 1 (one) no. 300 mm. x 200 mm. dia. 250 mtr deep Replacement Tubewell by D.R. Rig method with UPVC pipe & UPVC ribbed strainer for Augmentation of Ashudi Water Supply Scheme (H/W Site) under Bongaon Sub-Division, P.H.E. Dte. ORD/001148/2023-2024 2943/BD 27/09/2023 30 JOY GURU ENTERPRISE 16.12 14.83 100
1086 Barasat Division Acceptance cum work order for for protection works for newly laid different dia. UPVC/DI pipe line at different. places in khosbas, Singherkati mouza & Kanaknagar Mouza for Hingalganj w/s scheme (Zone-II), Hingalganj block under Hasnabad Sub-Division P.H.E. Dte. ORD/001149/2021-2022 237/BD 25/01/2022 30 M/S PROGATI ENTERPRISE. 31.04 31.03 1
1087 Barasat Division Formal work order for Laying of DI/UPVC distribution pipe line and providing Functional Household Tap Connection in connection with Augmentation of Barunhat Patlikhanpur water supply scheme (Z-I), Hasnabad Block under Hasnabad Sub-Division, PHE Dte. ORD/001150/2022-2023 699/BD 03/03/2023 90 MONDAL & CO. (BASIRHAT). 417.62 406.32 48
1088 Barasat Division Acceptance cum work order for Sinking of 2 nos. 300mm. x 200 mm. big dia 300 mtr deep Tube well by Direct Rotary Rig method for pump house no - 1 & 2 using PVC pipe & strainer having 300 mm Dia 36 mtr. long Housing Pipe and 200 mm Dia 30 mtr. long filter for Augmentation of Mominpur Water Supply Scheme in Basirhat - II Block of Basirhat Sub- Division under Barasat Division, PHE Dte. ORD/001151/2022-2023 674/BD 01/03/2023 30 DHELA BABA ENTERPRISE 42.67 0.00 0
1089 Barasat Division Acceptance cum work order for Sinking of 1 (one) no. 300 mm. x 200 mm. dia. 250 mtr deep Replacement Tubewell by D.R. Rig method with UPVC pipe & UPVC ribbed strainer for Augmentation of Kamalabas Water Supply Scheme (H/W Site) under Bongaon Sub-Division, P.H.E. Dte. ORD/001151/2023-2024 2944/BD 27/09/2023 30 JOY GURU ENTERPRISE 16.12 13.30 100
1090 Barasat Division Acceptance cum work order for Sinking of 1 (one) no. 300 mm. x 200 mm. dia. 250 mtr deep Replacement Tubewell by D.R. Rig method with UPVC pipe & UPVC ribbed strainer for Augmentation of Gadpukuria (Zone-I) Water Supply Scheme (H/W Site) under Bongaon Sub-Division, P.H.E. Dte. ORD/001152/2023-2024 2926/BD 26/09/2023 30 B.M.ENGINEERING. & CONSTRUCTION. 16.12 13.81 100
1091 Barasat Division Acceptance cum work order for Sinking of 1 (one) no. 300 mm. x 200 mm. dia. 250 mtr deep Replacement Tubewell by D.R. Rig method with UPVC pipe & UPVC ribbed strainer for Augmentation of Bagdah Water Supply Scheme (H/W Site) under Bongaon Sub-Division, P.H.E. Dte. ORD/001153/2023-2024 2927/BD 26/09/2023 30 DHELA BABA ENTERPRISE 16.10 12.71 100
1092 Barasat Division Acceptance cum work order for Sinking of 2 (two) no. 300 mm. x 200 mm. dia. 250 mtr deep Replacement Tubewell by D.R. Rig method with UPVC pipe & UPVC ribbed strainer for Augmentation of Krishnachandrapur Water Supply Scheme (H/W Site & 2nd T/W Site) under Bongaon Sub-Division, P.H.E. Dte. ORD/001154/2023-2024 2945/BD 27/09/2023 60 JOY GURU ENTERPRISE 32.24 28.00 100
1093 Barasat Division Acceptance cum work order for Renovation of Iron Elimination Plant at Berachampa Zone-I Water Supply Scheme within Deganga Block under Barasat Sub Division, P.H.E.Dte. ORD/001154/2024-2025 99/BD 09/01/2025 40 JAGANNATH CONSTRUCTION. 9.19 0.00 0
1094 Barasat Division Acceptance cum work order for Renovation of Iron Elimination Plant at Berachampa Zone-II Water Supply Scheme within Deganga Block under Barasat Sub Division, P.H.E.Dte. ORD/001155/2024-2025 615/BD 27/02/2025 40 ANJALI ENTERPRISE. 9.21 0.00 0
1095 Barasat Division Acceptance cum work order for Providing Functional Household Tap Connection(FHTC) from existing and new proposed distribution system within the command area of Sankchura Water Supply Scheme at Basirhat - I Block under Barasat Division, PHE Dte. (Phase - I) ORD/001156/2021-2022 245/BD 27/01/2022 45 SHIBU BISWAS. 78.21 77.09 1
1096 Barasat Division Acceptance cum work order for Renovation of Iron Elimination Plant at Deara Water Supply Scheme within Barasat-II Block under Barasat Sub Division, P.H.E.Dte. ORD/001156/2024-2025 375/BD 04/02/2025 40 TALUKDER & CO. 9.19 0.00 0
1097 Barasat Division Formal work order for Providing Functional Household Tap Connection (FHTC) in connection with Jal Jeevan Mission (JJM and JAL SWAPNA) under command area of CHIKANPARA Water Supply Scheme at GAIGHATA Block under Barasat Division, PHE Dte. (Phase-I) ORD/001157/2021-2022 259/BD 28/01/2022 90 SUPER SKILL. 195.19 194.56 1
1098 Barasat Division Formal work order for Laying of Di rising main, DI/UPVC distribution pipe line and providing Functional Household Tap Connection for Augmentation of Hingalganj water supply scheme (Z-I), Hingalganj Block under Hasnabad Sub-Division, PHE Dte. ORD/001157/2022-2023 697/BD 03/03/2023 90 M/S PROGATI ENTERPRISE. 296.42 288.69 53
1099 Barasat Division Acceptance cum work order for Renovation of Iron Elimination Plant at Matiagachha Water Supply Scheme within Barasat-II Block under Barasat Sub Division, P.H.E.Dte. ORD/001157/2024-2025 98/BD 09/01/2025 40 AMIT KUMAR BOSE. 9.19 0.00 0
1100 Barasat Division Formal work order for Laying of UPVC/DI distribution pipe line and providing Functional Household Tap Connection for Augmentation of Sultanpur water supply scheme, Minakhan Block under Hasnabad Sub-Division, PHE Dte. ORD/001158/2022-2023 698/BD 03/03/2023 90 SRI KRISHNA CO-OP-LABOUR CONTRACT AND CONST SOC LTD. 239.69 210.08 92
1101 Barasat Division Formal work order for Laying of Distribution system, Construction of Office cum Guard room, Switch cum Chlorine Room, Boundary wall, Surface drain, Land development and other allied works and Providing FHTC within the jurisdiction of (Zone-XII) under Habra-Gaighata surface based PWSS of Habra-I Block under Barasat Division, P.H.E. Dte. ORD/001159/2023-2024 2957/BD 29/09/2023 810 AMAL DUTTA ROY 1,929.73 190.93 22
1102 Barasat Division Hiring of 1 no. of Diesel Luxury Car (Euro - IV/VI) in good condition (traffic worthy) on daily basis for office use of the Assistant Engineer,Habra Sub-Division, P.H.E. Dte. (For the period from: 01.12.2021 to 30.11.2022) ORD/001160/2021-2022 488/HAB 30/11/2021 1 M/S LATIKA CONSTRUCTION. 1.73 3.52 1
1103 Barasat Division Formal work order for Laying of Distribution system, Construction of Office cum Guard room, Switch cum Chlorine Room, Boundary wall, Surface drain, Land development and other allied works and Providing FHTC within the jurisdiction of (Zone-XIII) under Habra-Gaighata surface based PWSS of Habra-I Block under Barasat Division, P.H.E. Dte. ORD/001160/2023-2024 2958/BD 29/09/2023 720 M/S S.S.ENTERPRISE. (SOUTH) 2,094.04 436.76 65
1104 Barasat Division Formal Work order for Providing Functional Household Tap Connection (FHTC) in connection with Jal Jeevan Mission (JJM and JAL SWAPNA) under command area of ICHHAPUR Water Supply Scheme at Gaighata Block under Barasat Division, PHE Dte. (Phase-I) ORD/001161/2021-2022 313/BD 01/02/2022 90 MONDAL & CO. (BASIRHAT). 123.07 121.07 1
1105 Barasat Division Formal work order for Laying of UPVC/DI distribution pipe line and providing Functional Household Tap Connection for Augmentation of Hingalganj water supply scheme (Z-II), Hingalganj Block under Hasnabad Sub-Division, PHE Dte. ORD/001161/2022-2023 700/BD 03/03/2023 90 M/S NIRMAN CONSTRUCTION. 313.44 291.97 40
1106 Barasat Division Formal work order for Laying of Distribution system, Construction of Office cum Guard room, Switch cum Chlorine Room, Boundary wall, Surface drain, Land development and other allied works and Providing FHTC within the jurisdiction of (Zone-XIX) under Habra-Gaighata surface based PWSS of Gaighata Block under Barasat Division, P.H.E. Dte. ORD/001161/2023-2024 2954/BD 29/09/2023 721 SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. 1,879.95 958.81 95
1107 Barasat Division Formal work order for Providing Functional Household Tap Connection (FHTC) in connection with Jal Jeevan Mission (JJM and JAL SWAPNA) under command area of Ghatpatila (Zone-I) Water Supply Scheme at Bagdah Block under Barasat Division, PHE Dte. (Phase-I) ORD/001162/2021-2022 314/BD 01/02/2022 90 M/S NIRMAN CONSTRUCTION. 113.02 112.46 1
1108 Barasat Division Formal work order for Laying of Distribution system, Construction of Office cum Guard room, Switch cum Chlorine Room, Boundary wall, Surface drain, Land development and other allied works and Providing FHTC within the jurisdiction of (Zone-XXI) under Habra-Gaighata surface based PWSS of Gaighata Block under Barasat Division, P.H.E. Dte. ORD/001162/2023-2024 2953/BD 29/09/2023 721 SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. 1,791.33 553.22 85
1109 Barasat Division Formal work order for Laying of Distribution system, Construction of Office cum Guard room, Switch cum Chlorine Room, Boundary wall, Surface drain, Land development and other allied works and Providing FHTC within the jurisdiction of (Zone-XXIII) under Habra-Gaighata surface based PWSS of Gaighata Block under Barasat Division, P.H.E. Dte. ORD/001163/2023-2024 2956/BD 29/09/2023 810 J.D.J.ENTERPRISE. (TRADERS PVT.LTD) 2,089.66 260.09 20
1110 Barasat Division Acceptance cum work order for construction of CWR at Sangrampur W/S scheme under Basirhat Sub-Division, P.H.E. Dte. under Barasat Division, PHE Dte. ORD/001165/2021-2022 333/BD 02/02/2022 45 MD AMIRUL MOLLA. 5.20 4.49 1
1111 Barasat Division Formal work order for Laying of Distribution system, Construction of Office cum Guard room, Switch cum Chlorine Room, Boundary wall, Surface drain, Land development and other allied works and Providing FHTC within the jurisdiction of (Zone-XXVI) under Habra-Gaighata surface based PWSS of Gaighata Block under Barasat Division, P.H.E. Dte. ORD/001165/2023-2024 2955/BD 29/09/2023 810 ALOK ENTERPRSE. (A UNIT OF SAKET TREXIM PVT.LTD) 1,603.84 652.61 75
1112 Barasat Division Formal work order for Providing Functional Household Tap Connection(FHTC) from existing and new proposed distribution system within the command area of Gokna Water Supply Scheme at Baduria Block under Barasat Division, PHE Dte. (Phase - I) ORD/001166/2021-2022 315/BD 01/02/2022 90 KINGS & CO. 220.60 214.18 1
1113 Barasat Division Formal work order for Laying of DI/UPVC distribution pipe line and providing Functional Household Tap Connection for Augmentation of Bermajur water supply scheme, Sandeshkhali-II Block under Hasnabad Sub-Division, PHE Dte. ORD/001166/2022-2023 701/BD 03/03/2023 90 M/S DATTA ENTERPRISE. 242.46 242.35 38
1114 Barasat Division Acceptance cum work order for Sinking of 1 (one) no. 300 mm. x 200 mm. dia. Tube well 250 mtr deep Replacement Tubewell by D.R. Rig method with UPVC pipe & UPVC ribbed strainer for Augmentation of Gabindapur Water Supply Scheme (H/W Site) within the Jurisdiction of Bongaon Sub-Division, under Barasat Division, P.H.E. Dte. ORD/001166/2023-2024 2921/BD 26/09/2023 30 B.M.ENGINEERING. & CONSTRUCTION. 16.13 13.50 29
1115 Barasat Division Continuation work order for the work of Hiring Diesel Luxury Car on daily basis (for 6months from 01-01-2022 to 30-06-2022) for the Office of the Assistant Engineer (HQ), Barasat Division, PHE Dte. ORD/001167/2021-2022 2686/BD 31/12/2021 181 M/S SAMIT CHANDRA DEY. 0.86 0.80 1
1116 Barasat Division Formal work order for Laying of DI rising main, DI/UPVC distribution pipe line and Providing (FHTC) for augmentation of Helencha Water Supply Scheme, Bagdah Block, under Bongaon Sub-Division, PHE Dte. ORD/001170/2022-2023 754/BD 09/03/2023 90 MONDAL ENTERPRISE. (BARASAT) 684.22 678.51 100
1117 Barasat Division Acceptance cum work order for Sinking of 1 (one) no. 300 mm. x 200 mm. dia. 250 mtr deep Replacement Tubewell by D.R. Rig method with UPVC pipe & UPVC ribbed strainer for Augmentation of Gangrapota Water Supply Scheme (H/W Site) under Bongaon Sub-Division, P.H.E. Dte. ORD/001170/2023-2024 2928/BD 26/09/2023 30 B.M.ENGINEERING. & CONSTRUCTION. 16.13 13.48 100
1118 Barasat Division Formal work order for Laying of Di rising main, DI/UPVC distribution pipe line and Providing (FHTC) for augmentation of Bansghata Water Supply Scheme, Bagdah Block, under Bongaon Sub-Division, PHE Dte. ORD/001171/2022-2023 760/BD 10/03/2023 90 UMWELT ENGINEER PVT.LTD. 747.85 747.34 100
1119 Barasat Division Acceptance cum work order for Sinking of 2 nos. 300 mm. x 200 mm. dia. 300 mtr deep Tubewell by D.R. Rig method with PVC pipe & strainer having 300mm dia 36 mtr. long housing pipe & 200mm dia 30 mtr. long filter for Augmentation of Khulna Bhanderkhali w/s scheme (Z-II), Sandeshkhali-II block under Hasnabad Sub-Division, P.H.E. Dte. ORD/001172/2022-2023 785/BD 13/03/2023 30 M/S NIRMAN CONSTRUCTION. 47.08 36.84 100
1120 Barasat Division Formal work order for Laying of Distribution system, Construction of Office cum Guard room, Switch cum Chlorine Room, Boundary wall, Surface drain, Land development and other allied works and Providing FHTC within the jurisdiction of (Zone-XXIV) under Habra-Gaighata surface based PWSS of Gaighata Block under Barasat Division, P.H.E. Dte. ORD/001172/2023-2024 2959/BD 29/09/2023 720 M/S S.S.ENTERPRISE. (SOUTH) 1,776.28 314.49 33
1121 Barasat Division Acceptance cum work order for Sinking of 2 nos. 300 mm. x 200 mm. dia. 300 mtr deep Tubewell by D.R. Rig method with PVC pipe & strainer having 300mm dia 36 mtr. long housing pipe & 200mm dia 30 mtr. long filter for Augmentation of Khulna Bhanderkhali w/s scheme (Z-I), Sandeshkhali-II block under Hasnabad Sub-Division, P.H.E. Dte. ORD/001173/2022-2023 786/BD 13/03/2023 30 MONDAL & CO. (BASIRHAT). 47.09 37.47 0
1122 Barasat Division Acceptance cum work order for Sinking of 1 nos. 300 mm. x 200 mm. dia. 300 mtr deep Tubewell by D.R. Rig method at PH No.- 1 with PVC pipe & strainer having 300mm dia 36 mtr. long housing pipe & 200mm dia 30 mtr. long filter for Augmentation of Mohanpur w/s scheme (Zone-I), Minakhan block under Hasnabad Sub-Division, P.H.E. Dte. ORD/001174/2022-2023 787/BD 13/03/2023 30 M/S RAJPATH CONSTRUCTION. 21.45 14.51 0
1123 Barasat Division Acceptance cum work order for Sinking of 2 nos. 300 mm. x 200 mm. dia. 300 mtr deep Tubewell by D.R. Rig method with PVC pipe & strainer having 300mm dia 36 mtr. long housing pipe & 200mm dia 30 mtr. long filter for Augmentation of Bouthakurani w/s scheme (Z-I), Sandeshkhali-II block under Hasnabad Sub-Division, P.H.E. Dte. ORD/001175/2022-2023 788/BD 13/03/2023 30 M/S DATTA ENTERPRISE. 47.05 38.83 0
1124 Barasat Division Acceptance cum work order for Sinking of 2 nos. 300 mm. x 200 mm. dia. 300 mtr deep Tubewell by D.R. Rig method at PH No.- 1 & 2 with PVC pipe & strainer having 300mm dia 36 mtr. long housing pipe & 200mm dia 30 mtr. long filter for Augmentation of Bouthakurani w/s scheme (Z-II), Sandeshkhali-II block under Hasnabad Sub-Division, P.H.E. Dte. ORD/001176/2022-2023 789/BD 13/03/2023 30 M/S DATTA ENTERPRISE. 47.04 37.49 1
1125 Barasat Division Acceptance cum work order for Sinking of 1 nos. 300 mm. x 200 mm. dia. 300 mtr deep Tubewell by D.R. Rig method with PVC pipe & strainer having 300mm dia 36 mtr. long housing pipe & 200mm dia 30 mtr. long filter for Augmentation of Malancha w/s scheme (Z-I), Minakhan block under Hasnabad Sub-Division, P.H.E. Dte. ORD/001177/2022-2023 790/BD 13/03/2023 30 ABDUL ALIM MONDAL. 21.44 17.49 100
1126 Barasat Division Acceptance cum work order for Supply of sluice valve i/c Construction of Sluice valve chamber and other allied works at different location within Kalitala w/s scheme, Hingalganj block under Hasnabad Sub- Division P.H.E. Dte. ORD/001178/2021-2022 251/HSD 07/02/2022 10 MONDAL & CO. (BASIRHAT). 4.62 4.62 1
1127 Barasat Division Acceptance cum work order for Sinking of 1 nos. 300 mm. x 200 mm. dia. 300 mtr deep Tubewell by D.R. Rig method with PVC pipe & strainer having 300mm dia 36 mtr. long housing pipe & 200mm dia 30 mtr. long filter for Augmentation of Kanaikati Kathalberia w/s scheme (Z-I), Hingalganj block under Hasnabad Sub-Division, P.H.E. Dte. ORD/001178/2022-2023 791/BD 13/03/2023 30 SRI KRISHNA CO-OP-LABOUR CONTRACT AND CONST SOC LTD. 26.26 18.02 7
1128 Barasat Division Formal work order for Laying Distribution system, Construction of Office cum Guard room, Switch cum Chlorine Room, Boundary wall, Surface drain, Land development and other allied works and Providing FHTC at Zonal Head Work Site Zone-VI within the jurisdiction of (Zone-VI) under Habra-Gaighata surface based PWSS of Deganga Block under Barasat Division, P.H.E. Dte. ORD/001178/2023-2024 3008/BD 05/10/2023 90 PATHIK PABAN NANDI 697.92 0.00 0
1129 Barasat Division Acceptance cum work order for Emergent restoration of concrete road for damage portion at different places due to laying of new UPVC pipe line within Kalitala w/s scheme, Hingalganj block under Hasnabad Sub-Division P.H.E. Dte. ORD/001179/2021-2022 252/HSD 07/02/2022 7 MONDAL & CO. (BASIRHAT). 2.06 0.87 1
1130 Barasat Division Acceptance cum work order for Sinking of 1 nos. 300 mm. x 200 mm. dia. 300 mtr deep Tubewell by D.R. Rig method with PVC pipe & strainer having 300mm dia 36 mtr. long housing pipe & 200mm dia 30 mtr. long filter for Augmentation of Kanaikati Kathalberia w/s scheme (Z-II), Hingalganj block under Hasnabad Sub-Division, P.H.E. Dte. ORD/001179/2022-2023 792/BD 13/03/2023 30 M/S PROGATI ENTERPRISE. 26.25 21.62 100
1131 Barasat Division Formal work order for Laying Distribution system, Construction of Office cum Guard room, Switch cum Chlorine Room, Boundary wall, Surface drain, Land development and other allied works and Providing FHTC at Zonal Head work site - XVII i.e. Betpuli within the jurisdiction of (Zone-XVII) under Habra-Gaighata surface based PWSS of Habra-I Block PART-F under Barasat Division, P.H.E. Dte. ORD/001179/2023-2024 3020/BD 05/10/2023 810 BALAJI UDDYOG 991.27 260.33 65
1132 Barasat Division Hiring 1 (one) no. Diesel Luxary Car on daily basis (for 01.09.2024 to 28.02.2025) for office use of the Assistant Engineer, R.W.S, Barasat Sub- Division, P.H.E. Dte. ORD/001179/2024-2025 983/BST 30/08/2024 181 DEBAPRASAD MONDAL. 0.86 1.47 0
1133 Barasat Division Acceptance cum work order for Supply of sluice valve i/c Construction of Sluice valve chamber and other allied works at different location within Rupmari w/s scheme (For Zone-IV to VI), Hingalganj block under Hasnabad Sub- Division P.H.E. Dte. ORD/001180/2021-2022 253/HSD 07/02/2022 10 M/S DATTA ENTERPRISE. 3.46 0.00 1
1134 Barasat Division Acceptance cum work order for Sinking of 2 nos. 300 mm. x 200 mm. dia. 300 mtr deep Tubewell by D.R. Rig method at PH No.-1 & 2 with PVC pipe & strainer having 300mm dia 36 mtr. long housing pipe & 200mm dia 30 mtr. long filter for Augmentation of Chandpur w/s scheme (Z-II), Hasnabad block under Hasnabad Sub-Division, P.H.E. Dte. ORD/001180/2022-2023 793/BD 13/03/2023 30 M/S RAJPATH CONSTRUCTION. 42.88 21.67 100
1135 Barasat Division Acceptance cum Work Order for Hiring of 1(one) number vehicle of Category Motor Cab/Maruti Omni(standard)(Non Air-Conditioned)/LPG/CNG Engine including Driver for performing the inspection works and official duties for the office of the Assistant Engineer, Barrackpore Sub-Division, P.H.E. Dte. at Barrackpore, Kolkata-700122, District- North 24Pgns, W.B. ORD/001180/2023-2024 253/BKP 31/07/2023 184 GOPAL SINGHA. 0.87 2.09 40
1136 Barasat Division Acceptance cum work order for Additional Laying of 75 mm dia. UPVC pipe line for Providing FHTC in connection with JJM and Jal Swapna at diff. places in Parghumti Mouza within Kalitala W/S scheme, Hingalganj block under Hasnabad Sub-Division within Barasat Division, PHE Dte. ORD/001181/2021-2022 254/HSD 07/02/2022 10 MONDAL & CO. (BASIRHAT). 4.54 4.54 1
1137 Barasat Division Acceptance cum work order for Sinking of 2 nos. 300 mm. x 200 mm. dia. 300 mtr deep Tubewell by D.R. Rig method at PH No.-1 & 2 with PVC pipe & strainer having 300mm dia 36 mtr. long housing pipe & 200mm dia 30 mtr. long filter for Augmentation of Mohanpur w/s scheme (Z-II), Minakhan block under Hasnabad Sub-Division, P.H.E. Dte. ORD/001181/2022-2023 794/BD 13/03/2023 30 M/S RAJPATH CONSTRUCTION. 42.87 33.12 0
1138 Barasat Division Acceptance cum work order for Surging and development of Big dia tubewell by Carrying out surging and back blowing of existing tube well including installation of suitable education pipes of adequate diameter upto required depth along with suitable airline pipes for injecting compressed air under pressure at the appropriates depth inside the tube well within Hasnabad Sub-Division PHE Dte. under Barasat Division P.H.E Dte. ORD/001181/2024-2025 172/BD 15/01/2025 210 EFFLUENT & WATERTREATMENT ENGINEERS (P) LTD. 30.65 0.00 60
1139 Barasat Division Acceptance cum work order for Additional Laying of 50 mm dia. UPVC pipe line for Providing FHTC in connection with JJM and Jal Swapna at diff. places in Parghumti Mouza within Kalitala W/S scheme, Hingalganj block under Hasnabad Sub-Division within Barasat Division, PHE Dte. ORD/001182/2021-2022 255/HSD 07/02/2022 10 MONDAL & CO. (BASIRHAT). 4.54 4.54 1
1140 Barasat Division Laying of badly damaged distribution pipe line and others allied works for making Panchayet Drain at Ichhapur water supply scheme under Bongaon Sub-Division, P.H.E.Dte. ORD/001182/2023-2024 329/Bon 03/05/2023 12 ROY ENGINEERS. 0.51 0.51 100
1141 Barasat Division Acceptance cum work order for Supply of sluice valve i/c Construction of Sluice valve chamber and other allied works at different location within Rupmari w/s scheme (For Zone-I to III), Hingalganj block under Hasnabad Sub- Division P.H.E. Dte. ORD/001183/2021-2022 256/HSD 07/02/2022 10 M/S PROGATI ENTERPRISE. 3.46 0.00 1
1142 Barasat Division Hiring 1(one) no. Diesel Luxary Car on daily basis (for 01.09.2023 to 29.02.2024) for office use of the Assistant Engineer, R.W.S, Barasat Sub- Division, P.H.E. Dte. ORD/001183/2023-2024 783/BST 29/08/2023 182 DEBAPRASAD MONDAL. 0.86 1.44 0
1143 Barasat Division Formal work order for Laying of UPVC distribution pipeline and Providing FHTC (Functional Household Tap Connection) for Augmentation of Dakshin Chatra Zone-II Water Supply Scheme in Swarupnagar Block of North 24 Parganas District under Barasat Division, PHE Dte. ORD/001186/2022-2023 1041/BD 31/03/2023 773 DIAMOND ENGINEER'S CO-OP. SOCIETY LTD. 378.49 337.54 37
1144 Barasat Division Formal work order for laying of UPVC distribution pipe line and Providing FHTC (Functional Household Tap Connection ) by augmentation for Goknashri Gobindapur water supply scheme in Basirhat-I block under Barasat Division, PHE Dte. ORD/001187/2022-2023 1042/BD 31/03/2023 739 UTPAL CONSTRUCTION & CO. 383.12 333.40 64
1145 Barasat Division Formal work order for Construction of 1200cum capacity 20mtr.Height R.C.C Over Head Reservoir and laying of Rising main & distribution pipe line by DI & UPVC and Providing FHTC for Augmentation of Chandrapur Water Supply Scheme under Barasat Sub-Division, P.H.E. Dte. ORD/001189/2023-2024 3062/BD 09/10/2023 662 MONDAL ENTERPRISE. (BARASAT) 1,459.09 462.91 46
1146 Barasat Division Formal work order for Laying of DI rising main, DI/UPVC distribution pipe line and providing Functional Household Tap connection for Augmentation of Kanaikati Kathalberia water Supply Scheme (Zone-I), Hingalganj Block under Hasnabad Sub-Division P.H.E.Dte. ORD/001190/2023-2024 4201/BD 31/10/2023 540 KINGS & CO. 707.01 538.15 80
1147 Barasat Division Formal work order for Construction of 900 cum capacity 20mtr Height R.C.C Over Head Reservoir and laying of Rising main & distribution pipe line by DI & UPVC and providing FHTC for Augmentation of Bodai Zone-I Water Supply Scheme under Barasat Sub-Division P.H.E.Dte. ORD/001196/2023-2024 3080/BD 10/10/2023 722 PUSPA ENTERPRISE. 1,051.63 444.01 64
1148 Barasat Division Hiring of Luxury Car (Diesel/Driven) for the office use of the Assistant Engineer Bongaon Sub-Division, P.H.E. Dte. Under Barasat Division P.H.E. Dte. (Period from:- 01/08/2023 to 31/01/ 2024). ORD/001199/2023-2024 591/Bon 31/07/2023 184 ROY ENGINEERS. 0.87 1.67 100
1149 Barasat Division Formal work order for for Laying of UPVC/DI distribution pipe line and providing Functional Household Tap Connection for Augmentation of Rajbari water supply scheme, Sandeshkhali-I Block under Hasnabad Sub-Division, PHE Dte. ORD/001200/2022-2023 829/BD 15/03/2023 90 M/S DATTA ENTERPRISE. 279.81 277.17 100
1150 Barasat Division Formal work order for Construction of 550 cum capacity 20 Mtr. staging height RCC Over Head Reservoir and laying of Rising main & distribution pipe line by DI & UPVC and providing FHTC for augmentation of Berachampa Zone-V Water Supply Scheme under Barasat Sub Division, P.H.E. Dte. ORD/001200/2023-2024 4070/BD 16/10/2023 687 DEBAPRASAD MONDAL. 567.01 187.89 45
1151 Barasat Division Formal work order for Laying of UPVC/DI distribution pipe line and providing Functional Household Tap Connection for Augmentation of Chotto Sehara water supply scheme, Sandeshkhali-I Block under Hasnabad Sub-Division, PHE Dte. ORD/001201/2022-2023 830/BD 15/03/2023 90 MONDAL & CO. (BASIRHAT). 227.81 209.69 0
1152 Barasat Division Formal work order for Construction of 550 cum capacity 20Mtr. Height R.C.C. Over Head Reservoir and laying of Rising main & distribution pipe line by DI & UPVC and providing FHTC for augmentation of Nebadhui Duttapukur Zone-II Water Supply Scheme under Barasat Sub Division, P.H.E. Dte. ORD/001201/2023-2024 4122/BD 17/10/2023 623 M/S B.K.ENTERPRISE. 598.56 105.24 35
1153 Barasat Division Formal work order for Construction of switch room cum chlorine room with sanitary & water supply arrangement i/c plinth protection at PH No.-1 (Size-5.40x3.60 mtr.) & PH No.-2 & 3 (Size-3.60x3.00 mtr.), Laying of DI rising main and DI/UPVC distribution pipe line, Providing Functional Household Tap Connection, Protection works for different dia. UPVC/DI distribution pipeline by UC bullah/Bamboo pile, Construction of 250 cum capacity 20 mtr staging height R.C.C Over Head water Reservoir as per Departmental design, drawing and specification including bored pile & pile cap within Khariat Abad W/S Scheme, Sandeshkhali block under Hasnabad Sub-Division, P.H.E. Dte. ORD/001202/2023-2024 4027/BD 12/10/2023 730 MAHAVIR PUMPS MANUFACTURING PVT.LTD. 618.97 62.02 50
1154 Barasat Division Formal work order for Construction of 700 cum capacity 20mtr staging height RCC Over Head Reservoir and laying of Rising main & distribution pipe line by DI & UPVC and providing FHTC for Augmentation of Berachampa Zone-IV Water Supply scheme under Barasat Sub-Division, P.H.E.Dte ORD/001204/2023-2024 4018/BD 12/10/2023 730 A.P POWER & CONCRETE 877.47 197.20 30
1155 Barasat Division Formal work order for Construction of switch room cum chlorine room with sanitary and water supply arrangement including plinth protection at PH No.-1 (Size-5.40x3.60 mtr.) & PH No.-2,3,4 (Size-3.60x3.00 mtr),Laying of DI rising main and DI/UPVC distribution pipe line,Providing Functional Household Tap Connection,Protection works for different dia. DI/UPVC rising/distribution pipeline by UC bullah/Bamboo pile at different places,Construction of 450 cum capacity 20 mtr. staging height R.C.C. Over Head Water Reservoir as per Departmental design, drawing and specification including bored pile & pile cap at Dakshin Akhratala water supply scheme, Sandeshkhali-I block under Hasnabad Sub-Division, PHE Dte. ORD/001208/2023-2024 4047/BD 13/10/2023 1091 M/S DATTA ENTERPRISE. 753.32 382.20 80
1156 Barasat Division Acceptance cum work order for Sinking of 1 no. 300mm. x 200 mm. big dia 300 mtr deep Tube well by Direct Rotary Rig method using PVC pipe & strainer having 300 mm Dia 42 mtr. long Housing Pipe and 200mm Dia 30 mtr. long filter for Augmentation of Sangrampur Water Supply Scheme in Basirhat - I Block of Basirhat Sub- Division under Barasat Division, PHE Dte. 2nd Call. ORD/001212/2024-2025 195/BD 16/01/2025 30 JESMINE ENTERPRISE. 21.72 0.00 0
1157 Barasat Division Formal work order for Laying of Distribution System, Providing FHTC, Construction of Office cum Guard room, Land development and Switch cum Chlorine Room, Boundary wall, Surface drain and other allied works within the jurisdiction of (Zone-XX) i.e. Matikumra / (Zone-XXII) i.e. Chikanpara under Habra-Gaighata surface based PWSS, of Gaighata Block under Barasat Division, P.H.E. Dte. GAIGHATA BLOCK, PART-B / Gaighata Block, PART-D ORD/001214/2023-2024 4073/BD 16/10/2023 730 SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. 2,790.09 1,430.41 88
1158 Barasat Division Formal work order for Construction of 1 no. 1250 Cum capacity OHR, Land development, Construction of Office cum Guard room and Switch cum Chlorine Room, Boundary wall, Surface drain and related allied works at Zone-IX Head work site including Laying Distribution System and FHTC of Habra-Gaighata surface water based water supply scheme under Barasat Division, P.H.E. Dte. ORD/001216/2023-2024 4138/BD 18/10/2023 1095 S & P ENTERPRISE 1,608.93 0.00 20
1159 Barasat Division Hiring of 1 no. of Diesel Luxury Car (Euro ¿ IV/VI) in good condition (traffic worthy) on daily basis for office use of the Assistant Engineer, for supervision of J.J.M. related work, executed within the entire jurisdiction of Habra Sub-Division, under Barasat Division P.H.E. Dte. (For the period from :01.09.23 to 29.02.24) ORD/001226/2023-2024 476/HAB 31/08/2023 182 M/S SUKANTA ENTERPRISE. 0.86 1.94 10
1160 Barasat Division Formal work order for Construction of 250 cum capacity 20 mtr staging height R.C.C Over Head water Reservoir as per Departmental design, drawing and specification including bored pile & pile cap for Augmentation of Sahebkhali water supply scheme (Zone-II), Hingalganj Block under Hasnabad Sub-Division, PHE Dte. under Barasat Division, PHE Dte. ORD/001228/2023-2024 4110/BD 17/10/2023 791 ROY CHOWDHURY CONSTRUCTION. 140.37 91.08 75
1161 Barasat Division Formal work order for Construction of 1150 cum capacity 20 mtr. staging height R.C.C. Over Head Water Reservoir as per Departmental design, drawing and specification including bored pile & pile cap at (Zone- XXV) i.e. Jhikra & Laying of Distribution System, Providing FHTC, Construction Land development, Construction of Office cum Guard room and Switch cum Chlorine Room, Boundary wall, Surface drain and other allied works within the jurisdiction of (Zone-XXV) under Surface Water based Water Supply Scheme for Arsenic Affected Areas of Habra-Gaighata & Adjoining Mouzas under North 24 Parganas District project¿ under Barasat Division, P.H.E. Dte. Gaighata Block, PART-G. ORD/001215/2023-2024 4081/BD 16/10/2023 747 GBC INFRASTRUCTURE PRIVATE LIMITED 1,699.27 341.53 45
1162 Barasat Division Day to Day repair Operation & maintenance of CI/DI/HDPE/UPVC/AC/GI Rising main & Distribution system for Bansghata water supply scheme under Bongaon Sub-Division, P.H.E.Dte. ORD/001229/2021-2022 622/Bon 31/12/2021 1 KAMAL HALDAR. 1.39 0.00 1
1163 Barasat Division Acceptance cum Work Order for Hiring of 1(one) number vehicle of Category Motor Cab/Maruti Omni(standard)(Non Air-Conditioned)/LPG/CNG Engine including Driver for performing the inspection works and official duties for the office of the Assistant Engineer, Barrackpore Sub-Division, P.H.E. Dte. at Barrackpore, Kolkata-700122, District- North 24Pgns, W.B.(From 01.10.2023 to 31.03.2024) ORD/001235/2023-2024 333/BKP 29/09/2023 182 GOPAL SINGHA. 0.87 1.57 80
1164 Barasat Division Formal work order for Laying of UPVC distribution pipe line and Providing FHTC (Functional Household Tap Connection ) by augmentation for Paschim Madhyampur water supply scheme in Basirhat-I block under Barasat Division, PHE Dte. ORD/001237/2022-2023 1040/BD 31/03/2023 702 UTPAL CONSTRUCTION & CO. 487.91 414.23 68
1165 Barasat Division Repairing and renovation of Compressor Room for Iron Elimination Plant under Augmentation of Kurulia (Zone-II) Water Supply Scheme within the jurisdiction of Bongaon Sub-Division under Barasat Division, P.H.E. Dte. ORD/001239/2023-2024 789/Bon 10/10/2023 15 A.D.ENTERPRISE. 1.59 1.56 100
1166 Barasat Division Construction of Approach Road Head Work at site for Augmentation of Sindrani (Zone-II) Water Supply Scheme within the jurisdiction of Bongaon Sub-Division under Barasat Division, P.H.E. Dte. ORD/001240/2023-2024 790/Bon 10/10/2023 15 UPWARDS ENGINEERING PRIVATE LIMITED 3.53 3.53 100
1167 Barasat Division Acceptance cum work order for for Providing Functional Household Tap Connection(FHTC) from existing and new proposed distribution system within the command area of Bansjhari Mallikpur Supply Scheme at Basirhat - I Block under Barasat Division, PHE Dte. (Phase -I). ORD/001242/2021-2022 400/BD 10/02/2022 30 SUDHAMAY MAJUMDAR. 50.02 48.28 1
1168 Barasat Division Acceptance cum work order for Providing Functional Household Tap Connection(FHTC) from existing and new proposed distribution system within the command area of Masia Nabastia water Supply Scheme at Baduria Block under Barasat Division, PHE Dte. (Phase - I) ORD/001243/2021-2022 401/BD 10/02/2022 45 PREMANANDA ROY BISWAS. 49.45 49.25 1
1169 Barasat Division Formal work order for Laying of UPVC distribution pipe line and Providing FHTC (Functional Household Tap Connection ) by augmentation for Gokulpur water supply scheme in Swarupnagar block under Barasat Division, PHE Dte. ORD/001245/2022-2023 1039/BD 31/03/2023 730 UTPAL CONSTRUCTION & CO. 411.53 360.52 70
1170 Barasat Division Formal work order for construction of 250 cum capacity 20 mtr. staging height R.C.C. Over Head Water Reservoir as per Departmental design, drawing and specification including bored pile & pile cap for Augmentaion of Champali water supply scheme, Minakhan Block under hasnabad Sub-Division, P.H.E. Dte. ORD/001247/2023-2024 4179/BD 30/10/2023 365 M/S BISWAS BROTHERS. 114.29 0.00 0
1171 Barasat Division Acceptance cum work order for Providing Functional Household Tap Connection(FHTC) from existing and new proposed distribution system within the command area of Akipur Water Supply Scheme at Basirhat - II Block under Barasat Division, PHE Dte. (Phase - I) ORD/001248/2021-2022 402/BD 10/02/2022 30 SARKAR ENTERPRISE & CO. 51.46 46.89 1
1172 Barasat Division Formal work order for construction of 250 cum capacity 20 mtr. staging height R.C.C. Over Head Water Reservoir as per Departmental design, drawing and specification including bored pile & pile cap for Kanmari water supply scheme (Zone-I), Sandeshkhali-I Block of Hasnabad Sub-Division, under Barasat Division, P.H.E. Dte. ORD/001248/2023-2024 4180/BD 30/10/2023 365 TRISHA ENTERPRISE & CO. 113.90 72.36 70
1173 Barasat Division Acceptance cum work order for Providing Functional Household Tap Connection(FHTC) from existing and new proposed distribution system within the command area of Eojnagar Water Supply Scheme at Basirhat - II Block under Barasat Division, PHE Dte. (Phase - I) ORD/001249/2021-2022 403/BD 10/02/2022 45 UTPAL CONSTRUCTION & CO. 91.51 0.00 1
1174 Barasat Division Acceptance cum work order for Construction of Boundary wall, Approach Road and Land development at Head Work site of Purana Bongaon Water Supply Scheme, Bongaon Block within the jurisdiction of Bongaon Sub-Division under Barasat Division, P.H.E. Dte. 2nd Call. ORD/001250/2024-2025 228/BD 20/01/2025 300 SARKAR ENTERPRISE & CO. 33.13 0.00 50
1175 Barasat Division Formal work order for construction of 300 cum capacity 20 mtr. staging height R.C.C. Over Head Water Reservoir as per Departmental design, drawing and specification including bored pile & pile cap for Augmentaion of Durgamandop water supply scheme, Sandeshkhali-II Block under Hasnabad Sub-Division, P.H.E. Dte. ORD/001252/2023-2024 4182/BD 30/10/2023 732 DEBASIS SAMADDAR 150.76 83.99 60
1176 Barasat Division Acceptance cum work order for Providing Functional Household Tap Connection(FHTC) from existing and new proposed distribution system within the command area of Dhanyakuria water Supply Scheme at Basirhat - II Block under Barasat Division, PHE Dte. (Phase - I) ORD/001256/2021-2022 404/BD 10/02/2022 45 UTPAL CONSTRUCTION & CO. 82.70 73.58 1
1177 Barasat Division Hiring of Luxury Car (Diesel) for the office use of the Assistant Engineer Bongaon Sub-Division, P.H.E. Dte. Under Barasat Division P.H.E. Dte. (Period from:- 01/08/2024 to 31/07/ 2025). ORD/001260/2024-2025 953/Bon 31/07/2024 365 ROY ENGINEERS. 1.73 1.89 0
1178 Barasat Division Formal work order for construction of 250 cum capacity 20 mtr. staging height R.C.C. Over Head Water Reservoir as per Departmental design, drawing and specification including bored pile & pile cap for Augmentation of Mohanpur water supply scheme (Zone-I), Minakhan Block of Hasnabad Sub-Division, under Barasat Division, P.H.E. Dte. ORD/001263/2023-2024 4193/BD 30/10/2023 365 M/S RAJPATH CONSTRUCTION. 114.56 0.00 0
1179 Barasat Division Formal work order for construction of 250 cum capacity 20 mtr. staging height R.C.C. Over Head Water Reservoir as per Departmental design, drawing and specification including bored pile & pile cap in connection with Augmentaion of Kanaikati Kathalberia water supply scheme (Zone-II), Hingalganj Block of Hasnabad Sub-Division, under Barasat Division, P.H.E. Dte. ORD/001264/2023-2024 4191/BD 30/10/2023 365 ABDUL ALIM MONDAL. 139.60 63.75 58
1180 Barasat Division Hiring of Vehicle for the (Diesel) for the office use as well as sites inspection of the Assistant Engineer Bongaon Sub-Division, P.H.E. Dte. Under Barasat Division P.H.E. Dte. Period from 01.01.2023 to 31.06.2023. for 6 (six) months. ORD/001266/2022-2023 676/BON 30/12/2022 182 VAI ENTERPRISE. 0.86 2.09 100
1181 Barasat Division Formal work order for construction of 300 cum capacity 20 mtr. staging height R.C.C. Over Head Water Reservoir as per Departmental design, drawing and specification including bored pile & pile cap for Augmentaion of Sahebkhali water supply scheme (Zone-I), Hingalganj Block under Hasnabad Sub-Division, P.H.E. Dte. ORD/001266/2023-2024 4200/BD 31/10/2023 365 M/S RAJPATH CONSTRUCTION. 150.42 0.00 0
1182 Barasat Division Acceptance cum work order for Construction and installation of MANIFOLD and allied works at OHR site at PH No.-1 within Jhupkhali w/s scheme, Sandeshkhali-II block under Hasnabad Sub-Division P.H.E. Dte. ORD/001271/2024-2025 355/BD 31/01/2025 45 B.S.ENTERPRISE. (BASIRHAT) 27.86 0.00 0
1183 Barasat Division Acceptance cum work order for Construction and installation of MANIFOLD and allied works at OHR site at PH No.-1 within Tushkhali w/s scheme, Sandeshkhali-II block under Hasnabad Sub-Division P.H.E. Dte. ORD/001272/2024-2025 259/BD 22/01/2025 45 B.S.ENTERPRISE. (BASIRHAT) 34.32 0.00 0
1184 Barasat Division Acceptance cum work order for Additional height for construction of PH No- 2 & other allied works at located canal side within Nityaberia w/s scheme, Sandeshkhali-I block under Hasnabad Sub- Division P.H.E. Dte. ORD/001289/2023-2024 1411/HSD 06/11/2023 10 BABUSONA CONSTRUCTION. 0.97 0.97 100
1185 Barasat Division Acceptance cum work order for 2 nos. pump connection at PH No.-1 & 2 in connection with Augmentation for Korakati water supply scheme, Sandeshkhali-II block under Hasnabad Sub-Division, P.H.E. Dte. ORD/001290/2023-2024 1412/HSD 06/11/2023 7 ANKUSH CONSTRUCTION & CO. 0.91 0.91 59
1186 Barasat Division Acceptance cum work order for 2 nos. pump connection at PH No.-1 & 2 in connection with Augmentation for Monipur water supply scheme, Sandeshkhali-II block under Hasnabad Sub-Division, P.H.E. Dte. ORD/001291/2023-2024 1413/HSD 06/11/2023 7 ANKUSH CONSTRUCTION & CO. 0.91 0.90 100
1187 Barasat Division Acceptance cum work order for Supply, fitting & fixing of sluice valve with valve chember at HW & 2nd TW site in connection with augmentation of Fakitakia w/s scheme, Sandeshkhali-I block under Hasnabad Sub- Division P.H.E. Dte. ORD/001292/2023-2024 1414/HSD 06/11/2023 7 BADAL GHOSH. 0.79 0.79 100
1188 Barasat Division Acceptance cum work order for Withdrawing & relaying of 110 mm dia. UPVC pipe line from PH no- 1 towards Adibasi Sonali Sangha of Murarisha W/S Scheme,Hasnabad block under Hasnasbad Sub-Division, P.H.E.Dte. ORD/001293/2022-2023 378/HSD 31/03/2023 10 MD.SALIM GAZI. 0.90 0.90 0
1189 Barasat Division Acceptance cum work order for Supply, fitting & fixing of sluice valve with valve chember at HW & 2nd TW site in connection with augmentation of Durgamandop w/s scheme, Sandeshkhali-II block under Hasnabad Sub- Division P.H.E. Dte. ORD/001293/2023-2024 1415/HSD 06/11/2023 7 SARKAR ENTERPRISE 0.83 0.83 100
1190 Barasat Division Acceptance cum work order for Construction of switch room cum chlorine room with sanitary and water supply arrangement including plinth protection at PH No.-1 (Size-5.40x3.60 mtr.) for Augmentation of Sahebkhali w/s scheme (Z-II), Hingalganj block under Hasnabad Sub-Division, P.H.E. Dte. ORD/001293/2024-2025 301/BD 28/01/2025 75 M/S S.HAQUE & CO. 12.36 0.00 0
1191 Barasat Division Acceptance cum work order for Supply, fitting & fixing of sluice valve with valve chember at HW & 2nd TW site in connection with augmentation of Monipur w/s scheme, Sandeshkhali-II block under Hasnabad Sub- Division P.H.E. Dte. ORD/001294/2023-2024 1416/HSD 06/11/2023 7 BADAL GHOSH. 0.97 0.97 100
1192 Barasat Division Acceptance cum work order for 2 nos. pump connection at PH No.-1 & 2 in connection with Augmentation for Khulna Bhanderkhali water supply scheme (Z-I) , Sandeshkhali-II block under Hasnabad Sub-Division, P.H.E. Dte. ORD/001295/2023-2024 1417/HSD 06/11/2023 7 ANKUSH CONSTRUCTION & CO. 0.98 0.96 100
1193 Barasat Division Formal work order for Additional Laying of UPVC distribution pipe line, Providing FHTC for the leftout portion, protection works & other allied works in connection with Augmentation of Korakati w/s scheme, Sandeshkhali-II block under Hasnabad Sub-Division, P.H.E. Dte. ORD/001295/2024-2025 865/BD 19/03/2025 270 M/S K.B.ENTERPRISE. 102.20 0.00 30
1194 Barasat Division Acceptance cum work order for 1 no. pump connection at PH No.-3 in connection with Augmentation for Khulna Bhanderkhali water supply scheme (Z-II) , Sandeshkhali-II block under Hasnabad Sub-Division, P.H.E. Dte. ORD/001296/2023-2024 1418/HSD 06/11/2023 7 DEB PRASAD GHOSH. 0.93 0.93 100
1195 Barasat Division Acceptance cum work order for 2 nos. pump connection at PH No.-1 & 2 in connection with Augmentation for Khulna Bhanderkhali water supply scheme (Z-II) , Sandeshkhali-II block under Hasnabad Sub-Division, P.H.E. Dte. ORD/001297/2023-2024 1419/HSD 06/11/2023 7 DEB PRASAD GHOSH. 0.96 0.96 100
1196 Barasat Division Acceptance cum work order for Restoration of 225 mm dia. UPVC pipe line due to construction of drain at Kharampur more within Dakshin Bhebia W/S Scheme (Z-II), Hasnabad block under Hasnasbad Sub-Division, P.H.E.Dte. ORD/001298/2023-2024 1420/HSD 06/11/2023 7 SARKAR ENTERPRISE 0.92 0.00 100
1197 Barasat Division Acceptance cum work order for 2 nos. pump connection at PH No.-1 & 2 in connection with Augmentation for Chandpur water supply scheme (Z-II) , Hasnabad block under Hasnabad Sub-Division, P.H.E. Dte. ORD/001301/2024-2025 147/HSD 27/01/2025 10 ANKUSH CONSTRUCTION & CO. 0.84 0.00 100
1198 Barasat Division Acceptance cum work order for Construction of boundary wall with RCC column structure at Head Work site (PH No-1) within Chunchura & Rajbari w/s scheme, Sandeshkhali-I block under Hasnabad Sub- Division P.H.E. Dte. ORD/001303/2023-2024 4376/BD 10/11/2023 90 MONDAL & CO. (BASIRHAT). 23.88 0.00 0
1199 Barasat Division Acceptance cum work order for 2 nos. pump connection at PH No.-1 & 2 in connection with Augmentation for Durgapur Baylani water supply scheme (Z-I) , Hingalganj block under Hasnabad Sub-Division, P.H.E. Dte. ORD/001303/2024-2025 149/HSD 27/01/2025 10 ABDUL ALIM MONDAL. 0.84 0.00 100
1200 Barasat Division Acceptance cum work order for Construction of boundary wall with RCC column structure at Head Work site (TW No-1) within Jhupkhali w/s scheme, Sandeshkhali-II block under Hasnabad Sub- Division P.H.E. Dte. ORD/001304/2023-2024 4377/BD 10/11/2023 90 JESMINE ENTERPRISE. 21.09 20.58 100
1201 Barasat Division Acceptance cum work order for 2 nos. pump connection at PH No.-1 & 2 in connection with Augmentation for Sahebkhali water supply scheme (Z-I) , Hingalganj block under Hasnabad Sub-Division, P.H.E. Dte. ORD/001304/2024-2025 150/HSD 27/01/2025 10 M/S DATTA ENTERPRISE. 0.95 0.00 100
1202 Barasat Division Acceptance cum work order for Construction of boundary wall with RCC column structure at head Work site within Daudpur w/s scheme, Sandeshkhali-II block under Hasnabad Sub- Division P.H.E. Dte. ORD/001305/2023-2024 4378/BD 10/11/2023 90 RAJPATH ENGINEERS-CO-OPERATIVE SOCIETY LTD. 23.09 21.09 100
1203 Barasat Division Continuation work order for Hiring Diesel Luxury Car on Daily basis (for 6 months from 01.04.2023 to 30.06.2023) for the office use of the Executive Engineer, Barasat Division, PHE Dte ORD/001306/2022-2023 1044/BD 31/03/2023 91 MADHAB CHANDRA DAS 0.45 0.69 100
1204 Barasat Division Acceptance cum Work order for Construction of boundary wall with RCC column structure at Head Work site within Tushkhali w/s scheme, Sandeshkhali-II block under Hasnabad Sub- Division P.H.E. Dte. ORD/001307/2023-2024 4379/BD 10/11/2023 90 R. B. ENTERPRISE 21.29 18.48 100
1205 Barasat Division Acceptance cum work order for Construction of boundary wall with RCC column structure at Head Work site (Ph No-1) within Sukhdoani w/s scheme, Sandeshkhali-II block under Hasnabad Sub- Division P.H.E. Dte. ORD/001309/2023-2024 4381/BD 10/11/2023 90 ABDUL ALIM MONDAL. 24.32 24.25 100
1206 Barasat Division Acceptance cum work order for Construction of boundary wall with brick masonry structure at Head Work site within Jeliakhali Purbakhanda w/s scheme, Sandeshkhali-II block under Hasnabad Sub- Division P.H.E. Dte. ORD/001311/2023-2024 4382/BD 10/11/2023 90 MD.SALIM GAZI. 28.33 26.22 68
1207 Barasat Division Route Survey, Design Drawing & Preparation of DPR for Kalupur Water Supply Scheme in Bongaon Block within the Jurisdiction of Bongaon Sub-Division under Barasat Division, PHE Dte. ORD/001315/2021-2022 122/Bon 18/02/2022 15 SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. 3.80 0.00 1
1208 Barasat Division Route Survey, Design Drawing & Preparation of DPR for Chhaygharia (Zone-I) Water Supply Scheme in Bongaon Block within the Jurisdiction of Bongaon Sub-Division under Barasat Division, PHE Dte. ORD/001317/2021-2022 123/Bon 18/02/2022 15 SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. 3.45 0.00 1
1209 Barasat Division Route Survey, Design Drawing & Preparation of DPR for Chhaygharia (Zone-II) Water Supply Scheme in Bongaon Block within the Jurisdiction of Bongaon Sub-Division under Barasat Division, PHE Dte. ORD/001318/2021-2022 124/Bon 18/02/2022 15 SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. 2.98 0.00 1
1210 Barasat Division Route Survey, Design Drawing & Preparation of DPR for Chhaygharia (Zone-III) Water Supply Scheme in Bongaon Block within the Jurisdiction of Bongaon Sub-Division under Barasat Division, PHE Dte. ORD/001320/2021-2022 125/Bon 18/02/2022 15 SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. 3.42 0.00 1
1211 Barasat Division Route Survey, Design Drawing & Preparation of DPR for Chowberia Water Supply Scheme in Bongaon Block within the Jurisdiction of Bongaon Sub-Division under Barasat Division, PHE Dte. ORD/001322/2021-2022 127/Bon 18/02/2022 15 SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. 3.45 0.00 1
1212 Barasat Division Route Survey, Design Drawing & Preparation of DPR for Gadpukuria (Zone-I) Water Supply Scheme in Bagdah Block within the Jurisdiction of Bongaon Sub-Division under Barasat Division, PHE Dte. ORD/001326/2021-2022 128/Bon 18/02/2022 15 SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. 4.55 4.55 1
1213 Barasat Division Route Survey, Design Drawing & Preparation of DPR for Gadpukuria (Zone-II) Water Supply Scheme in Bagdah Block within the Jurisdiction of Bongaon Sub-Division under Barasat Division, PHE Dte. ORD/001328/2021-2022 129/Bon 18/02/2022 15 SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. 3.73 0.00 1
1214 Barasat Division Route Survey, Design Drawing & Preparation of DPR for Ghatpatila (Zone-I) Water Supply Scheme in Bagdah Block within the Jurisdiction of Bongaon Sub-Division under Barasat Division, PHE Dte. ORD/001329/2021-2022 130/Bon 18/02/2022 15 SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. 4.11 4.11 1
1215 Barasat Division Route Survey, Design Drawing & Preparation of DPR for Ghatpatila (Zone-II) Water Supply Scheme in Bagdah Block within the Jurisdiction of Bongaon Sub-Division under Barasat Division, PHE Dte. ORD/001330/2021-2022 131/Bon 18/02/2022 15 SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. 3.89 0.00 1
1216 Barasat Division Route Survey, Design Drawing & Preparation of DPR for Gobindapur Water Supply Scheme in Bagdah Block within the Jurisdiction of Bongaon Sub-Division under Barasat Division, PHE Dte. ORD/001332/2021-2022 132/Bon 18/02/2022 15 SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. 4.21 4.19 1
1217 Barasat Division Route Survey, Design Drawing & Preparation of DPR for Hariharpur Water Supply Scheme in Bagdah Block within the Jurisdiction of Bongaon Sub-Division under Barasat Division, PHE Dte. ORD/001333/2021-2022 133/Bon 18/02/2022 15 SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. 3.14 3.14 1
1218 Barasat Division Acceptance cum work order for Construction of boundary wall with brick masonry structure at Head Work site (PH No-1) within Kalinagar w/s scheme (Z-II), Sandeshkhali-I block under Hasnabad Sub- Division P.H.E. Dte. ORD/001333/2023-2024 4436/BD 10/11/2023 90 M/S SANJAY ADHIKARI 16.63 16.49 81
1219 Barasat Division Route Survey, Design Drawing & Preparation of DPR for Helencha Water Supply Scheme in Bagdah Block within the Jurisdiction of Bongaon Sub-Division under Barasat Division, PHE Dte. ORD/001334/2021-2022 134/Bon 18/02/2022 15 SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. 4.84 4.84 1
1220 Barasat Division Acceptance cum work order for Construction of boundary wall with RCC column structure at PH No-1 & 2 within Kanmari w/s scheme (Z-I), Sandeshkhali-I block under Hasnabad Sub- Division P.H.E. Dte. ORD/001334/2023-2024 4406/BD 10/11/2023 90 NIKHIL SAMADDAR 26.72 10.03 70
1221 Barasat Division Route Survey, Design Drawing & Preparation of DPR for Kamlabas Water Supply Scheme in Bagdah Block within the Jurisdiction of Bongaon Sub-Division under Barasat Division, PHE Dte. ORD/001336/2021-2022 135/Bon 18/02/2022 15 SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. 3.26 3.26 1
1222 Barasat Division Route Survey, Design Drawing & Preparation of DPR for Kola Water Supply Scheme in Bagdah Block within the Jurisdiction of Bongaon Sub-Division under Barasat Division, PHE Dte. ORD/001337/2021-2022 136/Bon 18/02/2022 15 SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. 3.64 0.00 1
1223 Barasat Division Route Survey, Design Drawing & Preparation of DPR for Koniara Water Supply Scheme in Bagdah Block within the Jurisdiction of Bongaon Sub-Division under Barasat Division, PHE Dte. ORD/001338/2021-2022 137/Bon 18/02/2022 15 SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. 3.73 3.73 1
1224 Barasat Division Route Survey, Design Drawing & Preparation of DPR for Kurulia (Zone-I) Water Supply Scheme in Bagdah Block within the Jurisdiction of Bongaon Sub-Division under Barasat Division, PHE Dte. ORD/001339/2021-2022 138/Bon 18/02/2022 15 UMWELT ENGINEER PVT.LTD. 4.05 0.00 1
1225 Barasat Division Acceptance cum work order for Construction of boundary wall with RCC column & brick masonry & RCC Column structure at Head Work site & PH No- 3 within Kalinagar w/s scheme (Z-I), Sandeshkhali-I block under Hasnabad Sub- Division P.H.E. Dte. ORD/001339/2023-2024 4435/BD 10/11/2023 720 ABDUL HAMID GAZI. 31.93 0.00 80
1226 Barasat Division Route Survey, Design Drawing & Preparation of DPR for Kurulia (Zone-II) Water Supply Scheme in Bagdah Block within the Jurisdiction of Bongaon Sub-Division under Barasat Division, PHE Dte. ORD/001340/2021-2022 139/Bon 18/02/2022 15 UMWELT ENGINEER PVT.LTD. 3.86 3.86 1
1227 Barasat Division Hiring of 1(one) no Luxury Car (Diesel/Driven) for the office use of the Assistant Engineer Bongaon Sub-Division, P.H.E. Dte. Under Barasat Division P.H.E. Dte. (Period from:-01/02/2023 to 31/07/2023). ORD/001341/2022-2023 99/Bon 31/01/2023 181 ROY ENGINEERS. 0.86 1.26 100
1228 Barasat Division Route Survey, Design Drawing & Preparation of DPR for Malidah Water Supply Scheme in Bagdah Block within the Jurisdiction of Bongaon Sub-Division under Barasat Division, PHE Dte. ORD/001343/2021-2022 140/Bon 18/02/2022 15 SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. 3.74 0.00 1
1229 Barasat Division Hiring Diesel Luxury Car on daily basis (for 06 months from 01.01.2023 to 30.06.2023) for the office use of the Assistant Engineer, Basirhat Sub-Division P.H.E. Dte. ORD/001343/2022-2023 1420 /BHTSD 30/12/2022 181 OM ENTERPRISE 0.86 2.33 100
1230 Barasat Division Route Survey, Design Drawing & Preparation of DPR for Diara Water Supply Scheme in Bagdah Block within the Jurisdiction of Bongaon Sub-Division under Barasat Division, PHE Dte. ORD/001344/2021-2022 141/Bon 18/02/2022 15 SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. 4.08 4.07 1
1231 Barasat Division Hiring Diesel Luxury Car on daily basis (for 12 months from 01.07.2022 to 30.06.2023) for the office use of the Assistant Engineer, Basirhat Sub-Division P.H.E. Dte. ORD/001344/2022-2023 857/BHT 27/06/2022 365 DEB KUMAR DAS. 1.73 1.84 0
1232 Barasat Division Hiring of 1 no. of Diesel Luxury Car (Euro ¿ IV/VI) in good condition (traffic worthy) on daily basis for office use of the Assistant Engineer, Habra Sub-Division, P.H.E. Dte. (For the period from : 01.12.2022 to 30.11.2023) ORD/001346/2022-2023 660/HAB 30/11/2022 365 M/S LATIKA CONSTRUCTION. 1.73 4.40 40
1233 Barasat Division Route Survey, Design Drawing & Preparation of DPR for Shimulpur Water Supply Scheme in Gaighata Block within the Jurisdiction of Bongaon Sub-Division under Barasat Division, PHE Dte. ORD/001348/2021-2022 144/Bon 18/02/2022 15 SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. 4.34 0.00 1
1234 Barasat Division Acceptance cum work order for Withdrawing & relaying of 110 mm dia. UPVC pipe line from PH no- 1 towards Adibasi Sonali Sangha of Murarisha W/S Scheme,Hasnabad block under Hasnasbad Sub-Division, P.H.E.Dte. ORD/001348/2022-2023 378/HSD 31/03/2023 10 MD.SALIM GAZI. 0.90 0.00 0
1235 Barasat Division Route Survey, Design Drawing & Preparation of DPR for Ichhapur Water Supply Scheme in Gaighata Block within the Jurisdiction of Bongaon Sub-Division under Barasat Division, PHE Dte. ORD/001349/2021-2022 145/Bon 18/02/2022 15 SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. 4.21 4.19 1
1236 Barasat Division Acceptance cum work order for Hiring of one no. DIESEL MOTOR CAB (BS-VI) on daily basis for smooth implementation of JJM work under office of the Assistant Engineer, HASNABAD SUB-DIVISION, PHE DTE. Period from 01.02.23 to 31.07.23. ORD/001349/2022-2023 137/HSD 31/01/2023 181 SARKAR ENTERPRISE 0.86 1.85 100
1237 Barasat Division Acceptance cum work order for Construction of boundary wall with RCC column structure at Head Work (Ph No-1) site within Rampur w/s scheme, Sandeshkhali-II block under Hasnabad Sub- Division P.H.E. Dte. ORD/001349/2023-2024 4438/BD 10/11/2023 90 BASIRHAT ANCHALICK SHARAMICK THIKADARY SAMABAY SAMITY LTD. 22.05 20.63 100
1238 Barasat Division Route Survey, Design Drawing & Preparation of DPR for Ramnagar Water Supply Scheme in Gaighata Block within the Jurisdiction of Bongaon Sub-Division under Barasat Division, PHE Dte. ORD/001350/2021-2022 146/Bon 18/02/2022 15 SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. 2.98 2.98 1
1239 Barasat Division Route Survey, Design Drawing & Preparation of DPR for Chikanpara Water Supply Scheme in Gaighata Block within the Jurisdiction of Bongaon Sub-Division under Barasat Division, PHE Dte. ORD/001351/2021-2022 147/Bon 18/02/2022 15 SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. 4.37 4.37 1
1240 Barasat Division Acceptance cum work order for Construction of 350 cum capacity 20 mtr. staging height R.C.C. Over Head Water Reservoir as per Departmental design, drawing and specification including bored pile & pile cap at Chotto Sehara water supply scheme, Sandeshkhali-I block under Hasnabad Sub-Division, PHE Dte ORD/001355/2022-2023 1153/BD. 12/04/2022 240 S.S.ENTERPRISE. (BAMANGACHI) 143.13 94.50 95
1241 Barasat Division Formal work order for Additional Laying of UPVC distribution pipe line, Providing FHTC for the leftout portion, protection works & other allied works in connection with Augmentation of Baunia Abad w/s scheme, Sandeshkhali-I block under Hasnabad Sub-Division, P.H.E. Dte. ORD/001361/2024-2025 350/BD 31/01/2025 90 M/S DATTA ENTERPRISE. 223.88 0.00 0
1242 Barasat Division Acceptance cum work order for Additional Laying of UPVC distribution pipe line, Providing FHTC for the leftout portion, protection works & other allied works in connection with Augmentation of Padmapukuria w/s scheme (Z-I), Minakhan block under Hasnabad Sub-Division, P.H.E. Dte. ORD/001363/2024-2025 409/BD 06/02/2025 300 M/S RAJPATH CONSTRUCTION. 51.15 0.00 96
1243 Barasat Division Renovation of Iron Elimination Plant at Bamangachhi Water Supply Scheme at Pump House - I (46m3/hr.) within Barasat-I Block under Barasat Sub Division, P.H.E.Dte. ORD/001381/2024-2025 852/BSD 28/11/2024 30 MANGES INDUSTRIAL CORPORATION. 4.35 0.00 100
1244 Barasat Division Renovation of Iron Elimination Plant at Bamangachhi Water Supply Scheme at Pump House - IV (46m3/hr.) within Barasat-I Block under Barasat Sub Division, P.H.E.Dte. ORD/001382/2024-2025 853/BSD 28/11/2024 30 MANGES INDUSTRIAL CORPORATION. 4.35 0.00 0
1245 Barasat Division Construction of Pump House with latrine at Deara water Supply Scheme under Barasat-II Block size of 5.40m x 3.60m within Barasat Sub Division, P.H.E.Dte. ORD/001383/2024-2025 1021/BSD 03/01/2025 40 M.ENTERPRISE. 4.87 0.00 0
1246 Barasat Division Construction of Pump House with latrine at Matiagachha water Supply Scheme under Barasat-II Block size of 5.40m x 3.60m within Barasat Sub Division, P.H.E.Dte. ORD/001384/2024-2025 1022/BSD 03/01/2025 40 BUSTER CONSTRUCTION 4.87 0.00 0
1247 Barasat Division Acceptance cum work order for Construction of protection wall for protection of UPVC pipe line at N/H/O Hasmat Molla at Maliari for Augmentation of Padmapukuria w/s scheme, Minakhan block under Hasnabad Sub-Division P.H.E. Dte. ORD/001391/2023-2024 1495/HSD 01/12/2023 15 GAZI ENTERPRISE 4.03 3.94 70
1248 Barasat Division Hiring of 1(one) no Luxury Car (Diesel/Driven) for the office use of the Assistant Engineer Bongaon Sub-Division, P.H.E. Dte. Under Barasat Division P.H.E. Dte. (Period from:-01/02/2022 to 31/01/2023). ORD/001396/2021-2022 45/Bon 31/01/2022 1 ROY ENGINEERS. 1.73 1.68 1
1249 Barasat Division Acceptance cum work order for Construction of protection wall for protection of UPVC pipe line at Maliari Masjid pond for Augmentation of Padmapukuria w/s scheme, Minakhan block under Hasnabad Sub-Division P.H.E. Dte. ORD/001400/2023-2024 1494/HSD 01/12/2023 15 BABUSONA CONSTRUCTION. 4.41 4.41 68
1250 Barasat Division Hiring 1(One) No. Diesel Luxury Car on Daily basis. (for six months w.e.f. 08.09.2023) for the office use of the Assistant Engineer, Barasat Sub Division, P.H.E. Dte. ORD/001405/2023-2024 663/BSD 07/09/2023 182 ANJALI ENTERPRISE. 0.86 1.50 2
1251 Barasat Division Acceptance cum work order for Emergent withdrawing, relaying and laying of different dia. UPVC/DI pipe line at Boyermari Abad water supply scheme, Sandeshkhali-I block under Hasnabad Sub-Division, P.H.E.Dte ORD/001405/2024-2025 512/BD 17/02/2025 60 MUKHERJEE CONSTRUCTION (NADIA) 17.75 0.00 0
1252 Barasat Division Improvement of Iron Elimination Plant at Maslandapur Zone II WS Scheme within the jurisdiction of Habra Sub-Division under Barasat Division, P.H.E. Dte. ORD/001406/2023-2024 671/HAB 30/10/2023 30 S.G. ENTERPRISE 4.47 4.42 100
1253 Barasat Division Acceptance cum work order for Additional Construction of switch room cum chlorine room with sanitary and water supply arrangement including plinth protection for Dakshin Akhratala w/s scheme, Sandeshkhali-I block under Hasnabad Sub-Division, P.H.E. Dte. ORD/001414/2024-2025 144/BD 13/01/2025 75 JESMINE ENTERPRISE. 10.58 0.00 0
1254 Barasat Division Acceptance cum work order for Construction of switch room cum chlorine room (3.60x3.00) with sanitary and water supply arrangement including plinth protection for Hingalganj w/s scheme (Old), Hingalganj block under Hasnabad Sub-Division, P.H.E. Dte. ORD/001415/2024-2025 145/BD 13/01/2025 75 ABDUL HAMID GAZI. 10.59 0.00 0
1255 Barasat Division Acceptance cum work order for Additional Construction of switch room cum chlorine room (3.60x3.00) with sanitary and water supply arrangement including plinth protection at Dhamakhali mouza within Rampur w/s scheme, Sandeshkhali-II block under Hasnabad Sub-Division, P.H.E. Dte. ORD/001417/2024-2025 864/BD 19/03/2025 225 RUDRA DAS. 10.58 0.00 90
1256 Barasat Division Acceptance cum work order for Additional Construction of switch room cum chlorine room (3.60x3.00) with sanitary and water supply arrangement including plinth protection at Rampur & Jhupkhali adjoining mouza within Rampur w/s scheme, Sandeshkhali-II block under Hasnabad Sub-Division, P.H.E.Dte. ORD/001418/2024-2025 863/BD 19/03/2025 75 ABUL KALAM GAZI 10.60 0.00 100
1257 Barasat Division Acceptance cum work order for Construction of additional 1 no. switch room cum chlorine room (5.40x3.60) with sanitary and water supply arrangement including plinth protection within Bhangatushkhali w/s scheme, Sandeshkhali-II block under Hasnabad Sub-Division, P.H.E. Dte. ORD/001419/2024-2025 143/BD 13/01/2025 75 PRITAM MUKHOPADHYAY. 8.88 0.00 0
1258 Barasat Division Acceptance cum work order for Hiring diesel luxury car daily basis (From 22.11.2023 to 31.05.2024) for the Office uses of the Assistant Engineer (HQ) Barasat Division, P.H.Dte. ORD/001422/2023-2024 4461/BD 21/11/2023 192 KRISHNA SAHA. 0.91 1.72 18
1259 Barasat Division Improvement of Iron Elimination Plant at Talsa & Adj. Mouzas W/S Scheme within the jurisdiction of Habra Sub-Division under Barasat Division, P.H.E. Dte. ORD/001423/2023-2024 672/HAB 30/10/2023 30 M/S SANKAR ENTERPRISE. 3.29 3.23 100
1260 Barasat Division Improvement of Iron Elimination Plant at Janaphul W/S Scheme within the jurisdiction of Habra Sub-Division under Barasat Division, P.H.E. Dte. ORD/001424/2023-2024 692/HAB 02/11/2023 30 GHOSH CONSTRUCTION 4.51 4.50 100
1261 Barasat Division Acceptance cum work order for Construction of approach road & other allied works at Head Work site (PH No.-1) within Rampur w/s scheme, Sandeshkhali-II block under Hasnabad Sub-Division P.H.E. Dte ORD/001427/2021-2022 526/BD 23/02/2022 990 BASIRHAT ANCHALICK SHARAMICK THIKADARY SAMABAY SAMITY LTD. 31.47 13.57 100
1262 Barasat Division Improvement of Iron Elimination Plant at Maslandapur W/S Scheme (Zone - I) within the jurisdiction of Habra Sub-Division under Barasat Division, P.H.E. Dte. ORD/001430/2023-2024 693/HAB 02/11/2023 30 ANJALI CONSTRUCTION. 4.78 4.75 100
1263 Barasat Division Acceptance cum work order for Dismantling & Re-construction of boundary wall for movement of rig & other machineries for sinking of big dia TW at PH no- 1 in connection with Augmentation of Kumarjole w/s scheme, Minakhan block under Hasnabad Sub-Division P.H.E. Dte. ORD/001431/2024-2025 311/HSD 04/02/2025 10 ABDUL ALIM MONDAL. 0.81 0.00 0
1264 Barasat Division Improvement of Iron Elimination Plant at Khosdelpur & adj. Mouzas W/S Scheme within the jurisdiction of Habra Sub-Division under Barasat Division, P.H.E. Dte. ORD/001434/2023-2024 688/HAB 01/11/2023 30 M/S SUKANTA ENTERPRISE. 3.51 3.44 100
1265 Barasat Division Acceptance cum work order for Construction of boundary wall at OHR site & CWR site (PH No.-3) within Hingalganj w/s scheme (Zone-II), Hingalganj block under Hasnabad Sub-Division P.H.E. Dte. ORD/001436/2021-2022 527/BD 23/02/2022 30 ABDUL HAMID GAZI. 22.43 20.86 1
1266 Barasat Division Acceptance cum work order for Renovation and repairing of Balance Part of Boundary wall at OHR site for Augmentation of Gangrapota Water Supply Scheme, Bongaon Block within the jurisdiction of Bongaon Sub-Division under Barasat Division, P.H.E. Dte. ORD/001439/2024-2025 444/BD 10/02/2025 30 M.M.B. ENTERPRISE 13.50 0.00 0
1267 Barasat Division Acceptance cum work order for construction of additional 1 no. switch room cum chlorine room (5.40x3.60) with sanitary and water supply arrangement including plinth protection for augmentation of Durgamandop w/s scheme, Sandeshkhali-II block under Hasnabad Sub-Division, P.H.E. Dte. ORD/001440/2024-2025 110/BD 09/01/2025 75 MD.SALIM GAZI. 11.68 0.00 0
1268 Barasat Division Acceptance cum work order for Construction of boundary wall at OHR site & CWR site with approach road at CWR site within Hingalganj w/s scheme (Zone-I), Hingalganj block under Hasnabad Sub-Division P.H.E. Dte. ORD/001444/2021-2022 528/BD 23/02/2022 30 PRITAM MUKHOPADHYAY. 19.65 15.84 1
1269 Barasat Division Acceptance cum work order for Construction of Boundary wall at Head Work site for Augmentation of Malidah Water Supply Scheme, Bagdah Block within the jurisdiction of Bongaon Sub-Division under Barasat Division, P.H.E. Dte. ORD/001452/2023-2024 4407/BD 10/11/2023 60 BHABANI ENTERPRISE. 11.49 11.47 100
1270 Barasat Division Acceptance cum work order for Emergent resting of old rising main pipeline with UC Bullah pilling at OHR site in connection with augmentation io Barunhat Patlikhanpur w/s scheme (Z-I), Hasnabad block under Hasnabad Sub- Division P.H.E. Dte. ORD/001452/2024-2025 326/HSD 04/02/2025 10 MONDAL & CO. (BASIRHAT). 0.98 0.00 0
1271 Barasat Division Acceptance cum work order for Renovation and repairing of Boundary wall at Head Work site for Augmentation of Ghatpatila (Zone-I) Water Supply Scheme, Bagdah Block within the jurisdiction of Bongaon Sub-Division under Barasat Division, P.H.E. Dte. ORD/001454/2023-2024 4408/BD 10/11/2023 60 ONKAR ENTERPRISE. 11.79 0.00 100
1272 Barasat Division Formal work order for Additional Laying of UPVC distribution pipe line and Providing Functional Household Tap Connection for the left out portion in connection with Augmentation of Kumarjole water supply scheme, Minakhan Block under Hasnabad Sub-Division, PHE Dte. ORD/001455/2024-2025 571/BD 21/02/2025 120 JAL PRAVAHIKA PVT. LTD. 196.02 0.00 0
1273 Barasat Division Acceptance cum work order for Renovation and repairing of Boundary wall at Head Work site for Augmentation of Ghatpatila (Zone-II) Water Supply Scheme, Bagdah Block within the jurisdiction of Bongaon Sub-Division under Barasat Division, P.H.E. Dte. ORD/001457/2023-2024 4409/BD 10/11/2023 60 ROY CHOWDHURY CONSTRUCTION. 15.27 15.23 100
1274 Barasat Division Improvement of Iron Elimination Plant at Kamarpur & adj. Mouzas W/S Scheme within the jurisdiction of Habra Sub-Division under Barasat Division, P.H.E. Dte. ORD/001460/2023-2024 689/HAB 01/11/2023 30 M/S LATIKA CONSTRUCTION. 2.97 2.97 100
1275 Barasat Division Acceptance cum work order for the work of Hiring Diesel Luxury Car on daily basis for the Office of the Dy. Superintending Engineer-I, Monitoring Cell, PHE Dte. (Period from 01-01-2024 to 31-03-2024). ORD/001461/2023-2024 4696/BD 12/12/2023 91 DIPANKAR NASKAR. 0.43 0.90 100
1276 Barasat Division Repairing & Renovation of 1 No. Pump House (P.H. No-II) and allied works at Sohai Swetpur Water Supply Scheme Zone-I under Barasat Sub-Division, P.H.E.Dte. Sl. No.-7 ORD/001469/2021-2022 817/BSD 10/12/2021 30 JIBON BOSE. 1.25 1.10 0
1277 Barasat Division Acceptance cum work order for 1 no. pump connection at PH No.-1 in connection within Sankardaha water supply scheme , Minakhan block under Hasnabad Sub-Division, P.H.E. Dte ORD/001471/2024-2025 345/HSD 06/02/2025 10 M/S DATTA ENTERPRISE. 0.72 0.00 100
1278 Barasat Division Acceptance cum work order for Construction of Boundary wall at Head work site for Augmentation of Gadpukuria (Zone-I) water Supply scheme, Bagdah Block within jurisdiction of Bongaon Sub-Division, P.H.E. Dte. ORD/001472/2023-2024 4411/BD 10/11/2023 60 GHOSH CONSTRUCTION. 19.46 19.43 100
1279 Barasat Division Acceptance cum work order for Construction of Boundary wall at Head work site for Augmentation of Gadpukuria (Zone-II) water Supply scheme, Bagdah Block within jurisdiction of Bongaon Sub-Division, P.H.E. Dte. ORD/001478/2023-2024 4410/BD 10/11/2023 60 PRABIR KUMAR MONDAL. 15.90 10.04 85
1280 Barasat Division Continuation order for Hiring of one no. Disel Motor Cab (BS-IV) on daily hire basis for use of the Assistant Engineer, Hasnabad Sub-Division, PHE Dte. Period from 01.10.2022 to 30.09.2023. ORD/001479/2022-2023 1656/HSD 28/09/2022 365 SUSMITA MANDAL. 1.72 3.72 50
1281 Barasat Division Acceptance cum work order for Renovation & repairing of Boundary wall at Head work site for Augmentation of Chandpara water Supply scheme, Gaighata Block within jurisdiction of Bongaon Sub-Division, P.H.E. Dte. ORD/001479/2023-2024 4412/BD 10/11/2023 60 BHABANI ENTERPRISE. 13.44 13.36 100
1282 Barasat Division Hiring of 1(one) no Luxury Car (Diesel/Driven) for the office use of the Assistant Engineer Bongaon Sub-Division, P.H.E. Dte. Under Barasat Division P.H.E. Dte. (Period from:-01/02/2023 to 31/07/2023). ORD/001480/2022-2023 99/.BON 31/01/2023 181 ROY ENGINEERS. 0.86 0.65 100
1283 Barasat Division Acceptance cum work order for Renovation & repairing of Boundary wall at Head work site for Augmentation of Chikanpara water Supply scheme, Gaighata Block within jurisdiction of Bongaon Sub-Division, P.H.E. Dte. ORD/001480/2023-2024 4413/BD 10/11/2023 60 VAI ENTERPRISE. 10.85 10.76 100
1284 Barasat Division Acceptance cum work order for Construction of Boundary wall at Head work site for Augmentation of Diara water Supply scheme, Bagdah Block within the jurisdiction of Bongaon Sub-Division, under Barasat Division P.H.E. Dte. ORD/001481/2023-2024 4414/BD 10/11/2023 60 ACHINTA KUMAR HALDER. 14.50 14.50 100
1285 Barasat Division Repairing & Renovation of 1 No. Pump House (Size- 5.20 x 7.20) of Head Work Site and allied works at Sohai Swetpur Water Supply Scheme Zone-I under Barasat Sub-Division, P.H.E.Dte. Sl. No.-6 ORD/001483/2021-2022 816/BSD 10/12/2021 30 M/S S.HAQUE & CO. 1.84 1.74 0
1286 Barasat Division Acceptance cum work order for Construction of Boundary wall at 2nd Tube Well site and construction of Approach Road at 1st T/W & 2nd T/W site under Augmentation of Malidah Water Supply Scheme, Bagdah Block within the jurisdiction of Bongaon Sub-Division under Barasat Division P.H.E. Dte. ORD/001486/2023-2024 4465/BD 21/11/2023 23 KAMAL HALDER. 7.15 7.15 100
1287 Barasat Division Acceptance cum work order for Construction of Boundary wall at 2nd Tube Well site and construction of Approach Road at 1st T/W & 2nd T/W site under Augmentation of Ghatpatila (Zone-I) Water Supply Scheme, Bagdah Block within the jurisdiction of Bongaon Sub-Division under Barasat Division P.H.E. Dte. ORD/001487/2023-2024 4464/BD 21/11/2023 23 KAMAL HALDER. 6.86 3.43 60
1288 Barasat Division Acceptance cum work order for Construction of Boundary wall at 2nd Tube Well site and construction of Approach Road at 1st T/W & 2nd T/W site under Augmentation of Ghatpatila (Zone-II) Water Supply Scheme, Bagdah Block within the jurisdiction of Bongaon Sub-Division under Barasat Division P.H.E. Dte. ORD/001488/2023-2024 4463/BD 21/11/2023 414 ROY ENGINEERS. 9.57 0.00 0
1289 Barasat Division Acceptance cum work order for Construction of Boundary wall at 2nd Tube Well site and construction of Approach Road at 1st T/W & 2nd T/W site under Augmentation of Gadpukuria (Zone-I) Water Supply Scheme, Bagdah Block within the jurisdiction of Bongaon Sub-Division under Barasat Division P.H.E. Dte. ORD/001493/2023-2024 4462/BD 21/11/2023 23 A.D.ENTERPRISE. 11.48 11.45 100
1290 Barasat Division Acceptance cum work order for Construction of Boundary wall at 2nd Tube Well site and Construction of Approach Road at 1st T/W & 2nd T/W site under Augmentation of Gadpukuria (Zone-II) water Supply scheme, Bagdah Block within jurisdiction of Bongaon Sub-Division, P.H.E. Dte. ORD/001496/2023-2024 4486/BD 23/11/2023 414 MA CONSTRUCTION. 9.25 0.00 45
1291 Barasat Division Acceptance cum work order for Sinking of 2 nos. 300 mm. x 200 mm. dia. 360 mtr deep Tubewell by D.R. Rig method with PVC pipe & strainer having 300mm dia 48 mtr. long housing pipe & 200mm dia 30 mtr. long filter for within Atpukur (Z-I) and Uchildaha w/s scheme, Minakhan block under Hasnabad Sub-Division, P.H.E. Dte. ORD/001497/2024-2025 633/BD 28/02/2025 45 SHIBU BISWAS. 51.76 0.00 0
1292 Barasat Division Acceptance cum work order for Construction of Boundary wall aand Construction of Approach Road at 1st T/W site under Augmentation of Chauberia water Supply scheme, Bongaon Block within jurisdiction of Bongaon Sub-Division, under Barasat Division P.H.E. Dte. ORD/001499/2023-2024 4485/BD 23/11/2023 23 TAPAN GHOSH. 5.58 5.57 100
1293 Barasat Division Acceptance cum work order for Sinking of 3 nos. 300 mm. x 200 mm. dia. 360 mtr deep Tubewell by D.R. Rig method at Ph No- 1, 2 & 3 with PVC pipe & strainer having 300mm dia 48 mtr. long housing pipe & 200mm dia 30 mtr. long filter for Ketarchak w/s scheme, Hingalganj block under Hasnabad Sub-Division, P.H.E. Dte. ORD/001501/2024-2025 634/BD 28/02/2025 60 SRI KRISHNA CO-OP-LABOUR CONTRACT AND CONST SOC LTD. 77.48 0.00 0
1294 Barasat Division Acceptance cum work order for Sinking of 3 nos. 300 mm. x 200 mm. dia. 360 mtr deep Tubewell by D.R. Rig method at Ph No- 1, 2 & 3 with PVC pipe & strainer having 300mm dia 48 mtr. long housing pipe & 200mm dia 30 mtr. long filter for Kusangra w/s scheme, Minakhan block under Hasnabad Sub-Division, P.H.E. Dte. ORD/001502/2024-2025 632/BD 28/02/2025 60 SRI KRISHNA CO-OP-LABOUR CONTRACT AND CONST SOC LTD. 77.49 0.00 0
1295 Barasat Division Acceptance cum work order for Sinking of 3 nos 300mm. X 200mm.dia. 200.00mtr. deep tube well by direct rotary rig method, having 300mm.dia. 42.0mtr. long PVC housing pipe & 200mm.dia. 30.0mtr. long UPVC Medium Well Screen (RMS) Pipes with Ribs at Berachampa Zone-II( H/W site & 2nd T/W site) & Berachampa Zone-III( 2nd T/W site) Water Supply Scheme under Barasat Sub-Division, P.H.E. Dte. ORD/001503/2024-2025 646/BD 28/02/2025 60 JOY GURU ENTERPRISE 42.76 0.00 0
1296 Barasat Division Acceptance cum work order for Protection of UPVC distribution pipeline by UC bullah pile at different places for protection of different dia UPVC distribution pipe line within Bermajur w/s scheme, Sandeshkhali-II block under Hasnabad Sub- Division P.H.E. Dte. ORD/001526/2021-2022 1865/HSD 17/11/2021 15 M/S NIRMAN CONSTRUCTION. 4.79 4.77 1
1297 Barasat Division Acceptance cum work order for Providing Functional Household Tap Connection for the leftout portion at Dholkhali Mouza in connection with Augmentation of Bouthakurani water supply scheme (Z- I), Sandeskhali-II Block under Hasnabad Sub-Division, PHE Dte. ORD/001531/2024-2025 386/HSD 10/02/2025 10 HASAN ENTERPRISE 0.97 0.00 0
1298 Barasat Division Acceptance cum work order for 2 nos. pump connection at PH No.-1 & 2 for Nityaberia water supply scheme, Sandeskhali-I block under Hasnabad Sub-Division, P.H.E. Dte. ORD/001532/2024-2025 387/HSD 10/02/2025 10 KINGS & CO. 0.95 0.00 0
1299 Barasat Division Acceptance cum work order for Sinking of 1 no. 300 mm. x 200 mm. dia. 270 mtr deep tubewell by D.R. Rig method having 300 mm. dia. 36 mtr. long housing pipe & 200 mm. dia. 30 mtr. long Filter at Pump House No. - 2 of Maslandapur(Zone - II) water supply scheme within the jurisdiction of Habra Sub-Division, under Barasat Division, P.H.E. Dte. ORD/001533/2023-2024 07/BD 02/01/2024 30 M/S B.K.ENTERPRISE. 19.45 16.71 100
1300 Barasat Division Acceptance cum work order for Sinking of 1 no. 300 mm. x 200 mm. dia. 270 mtr deep tubewell by D.R. Rig method having 300 mm. dia. 36 mtr. long housing pipe & 200 mm. dia. 30 mtr. long Filter at Pump House No. - 1 of Bergum water supply scheme within the jurisdiction of Habra Sub-Division, under Barasat Division, P.H.E. Dte. ORD/001535/2023-2024 06/BD 02/01/2024 30 M/S B.K.ENTERPRISE. 19.45 17.58 100
1301 Barasat Division Acceptance cum work order for Construction of additional 1 no. switch room cum chlorine room (5.40x3.60) with sanitary and water supply arrangement including plinth protection at Chikar more end within Chutkia Radhanagar w/s scheme, Minakhan block under Hasnabad Sub-Division, P.H.E. Dte. ORD/001536/2024-2025 111/BD 09/01/2025 150 TARUN KUMAR LAHA 7.47 0.00 0
1302 Barasat Division Acceptance cum work order for Balance Work of Laying of UPVC Distribution pipe line and providing FHTC for augmentation of Nalabara Z-II water Supply Scheme within Swarupnagar Block under Basirhat Sub Division PHE Dte. ORD/001537/2024-2025 399/BD 05/02/2025 180 H.I.ENTERPRISE. 75.98 0.00 65
1303 Barasat Division Acceptance cum work order for Renovation of 34 Cum/hr of capacity AIRP and allied works at Head work site for Augmentation of Kola water Supply Scheme under Bongaon Sub-Division, Barasat Division P.H.E. Dte. ORD/001541/2023-2024 12/BD 02/01/2024 60 PUSPA ENTERPRISE. 38.78 31.28 100
1304 Barasat Division Repairing & Renovation of 1 No. Pump House (Size- 5.20 x 7.20) of Head Work Site and allied works at Bodai Water Supply Scheme Zone-I under Barasat Sub-Division, P.H.E.Dte. Sl. No.-1 ORD/001542/2021-2022 805/BSD 06/12/2021 30 PURBA SERVICES 1.84 1.75 0
1305 Barasat Division Acceptance cum work order for Renovation of 103 Cum/hr of capacity AIRP and allied works at Head work site for Augmentation of Gadpukuria (Zone-I) water Supply Scheme under Bongaon Sub-Division, Barasat Division P.H.E. Dte. ORD/001542/2023-2024 13/BD 02/01/2024 365 EFFLUENT & WATERTREATMENT ENGINEERS (P) LTD. 77.74 70.84 100
1306 Barasat Division Acceptance cum work order for Renovation of 32 Cum/hr of capacity AIRP and allied works at Head work site for Augmentation of Koniara water Supply Scheme under Bongaon Sub-Division, Barasat Division P.H.E. Dte. ORD/001543/2023-2024 14/BD 02/01/2024 60 EFFLUENT & WATERTREATMENT ENGINEERS (P) LTD. 36.22 28.24 100
1307 Barasat Division Acceptance cum work order for Renovation and repairing of Boundary wall at 1st Tube Well & 2nd Tube Well site and Construction of Approach Road at 1st Tube Well & 2nd Tube Well site under Augmentation of Chhaygharia (Zone-II) Water Supply Scheme, Bongaon Block within the jurisdiction of Bongaon Sub-Division under Barasat Division, P.H.E. Dte ORD/001552/2023-2024 38/BD 04/01/2024 23 M/S SANJAY ADHIKARI 12.00 11.94 100
1308 Barasat Division Continuation work order for Hiring 1(One) No. Diesel Luxury Car on Daily basis for 6 (six) months for the office use of the Assistant Engineer, Barasat Sub Division, P.H.E. Dte. @ Rs. 475.00 (Rupees four hundred and seventy five only) per day excluding fuel. (Period from 01/03/2025 to 31/08/2025) ORD/001553/2024-2025 1194/BSD 24/02/2025 184 ANJALI ENTERPRISE. 0.87 0.67 0
1309 Barasat Division Acceptance cum work order for Renovation and repairing of Boundary wall at 3rd Tube Well site and Construction of Approach Road at 3rd Tube Well site and Head work site under Augmentation of Chandpara Water Supply Scheme, Gaighata Block within the jurisdiction of Bongaon Sub-Division under Barasat Division, P.H.E. Dte. ORD/001555/2023-2024 41/BD 04/01/2024 23 ROY ENGINEERS. 7.40 1.96 100
1310 Barasat Division Acceptance cum work order for Renovation and repairing of Boundary wall at 3rd Tube Well site and Construction of Approach Road at 3rd Tube Well site and Head work site under Augmentation of Chikanpara Water Supply Scheme, Gaighata Block within the jurisdiction of Bongaon Sub-Division under Barasat Division, P.H.E. Dte. ORD/001559/2023-2024 40/BD 04/01/2024 23 M/S.RAJESH CONTRUCTION 8.42 8.18 100
1311 Barasat Division Acceptance cum work order for Eucalyptus Bullah Pilling for Emergency protection Work of Pipe line at different places for Augmentation of Aturia Zone-I Water Supply Scheme of Basirhat Sub Division under Barasat Division P.H.E. ORD/001560/2024-2025 724/BD 07/03/2025 30 SHIBU BISWAS. 44.01 0.00 0
1312 Barasat Division Acceptance cum work order for Construction of Boundary wall at 2nd Tube Well site and Construction of Approach Road at 1st T/W & 2nd T/W site under Augmentation of Diara Water Supply Scheme, Bagdah Block within the jurisdiction of Bongaon Sub-Division under Barasat Division, P.H.E. Dte. ORD/001561/2023-2024 39/BD 04/01/2024 391 J AND T ENTERPRISE 8.89 0.00 0
1313 Barasat Division Acceptance cum work order for Eucalyptus Bullah Pilling for Emergency protection Work of Pipe line at different places for Augmentation of Dhanyakuria Water Supply Scheme of Basirhat Sub Division under Barasat Division P.H.E. ORD/001561/2024-2025 542/BD 19/02/2025 30 SAMIR KUMAR DEY. 52.24 0.00 0
1314 Barasat Division Acceptance cum work order for Laying of badly damaged UPVC Distribution Pipe Lines due to laying of Secondary Rising Main of Habra-Gaighata Project from Amkola More to Kulipara More along with Road Restoration and other allied works at ICCHAPUR Water Supply Scheme within the jurisdiction of Bongaon SubDivision, under Barasat Division P.H.E.Dte. ORD/001576/2023-2024 85/BD 08/01/2024 30 NEW MILLENNIUM ENGG'S CO-OP-SO-LTD. 19.15 19.14 100
1315 Barasat Division Acceptance cum work order for Digitalization of pipeline alignment, elevation survey and asset evaluation of 7 nos. schemes namely Jeliakhali, Bhangatushkhali, Tushkhali, Joygopalpur, Korakati, Durgamandop and Monipur under Sandeshkhali-II block in North 24 Parganas District under Hasnabad Sub-Division, P.H.E Dte. ORD/001599/2024-2025 677/BD 04/03/2025 90 HORIZEN. 22.46 16.80 80
1316 Barasat Division Acceptance cum work order for Hire and labour charges for staging and scaffolding, bamboo baricading and removal of rubbish for dismantling of existing OHR at Head work Site of Bagdah Water Supply Scheme Bagdah Block within the jurisdiction of Bongaon Sub-Division under Barasat Division, P.H.E. Dte. ORD/001600/2024-2025 705/BD 06/03/2025 60 TAPAN GHOSH. 11.39 0.00 0
1317 Barasat Division Acceptance cum work order for Emergent resting of 200 mm dia DI pipeline by concrete block at different places in connection with Augmentation of Malancha w/s scheme (Z-I), Minakhan block under Hasnabad Sub-Division P.H.E. Dte. ORD/001601/2023-2024 30/HSD 09/01/2024 10 NEW MANGES INDUSTRIAL CORPORATION 0.94 0.95 80
1318 Barasat Division Acceptance cum work order for Hire and labour charges for staging and scaffolding, bamboo baricading and removal of rubbish for dismantling of existing OHR at Head work Site of Kurulia Zone-II Water Supply Scheme Bagdah Block within the jurisdiction of Bongaon Sub-Division under Barasat Division, P.H.E. ORD/001601/2024-2025 706/BD 06/03/2025 60 HAQUE ENTERPRISE 8.76 0.00 0
1319 Barasat Division Acceptance cum work order for Emergent resting of 150 mm dia DI pipeline by concrete block at different places in connection with Augmentation of Malancha w/s scheme (Z-I), Minakhan block under Hasnabad Sub-Division P.H.E. Dte. ORD/001602/2023-2024 31/HSD 09/01/2024 10 NEW MANGES INDUSTRIAL CORPORATION 0.94 0.95 82
1320 Barasat Division Acceptance cum work order for Emergent resting of 100 mm dia DI pipeline by concrete block at different places in connection with Augmentation of Malancha w/s scheme (Z-I), Minakhan block under Hasnabad Sub-Division P.H.E. Dte. ORD/001604/2023-2024 32-HSD.. 09/01/2024 10 NEW MANGES INDUSTRIAL CORPORATION 0.91 0.00 0
1321 Barasat Division Acceptance cum work order for Construction of temporary approach road for moving of rig machineries at PH No- 1 within Kanaikati Kathalberia w/s scheme (Zone-II), Hingalganj block under Hasnabad Sub- Division P.H.E. Dte. ORD/001612/2023-2024 40/HSD 09/01/2024 10 M/S PROGATI ENTERPRISE. 0.76 0.76 100
1322 Barasat Division Acceptance cum work order for Hiring Diesel Luxury Car on Daily basis ( from 01.01.2024 to 31.03.2024) for the office use of Deputy Superintending Engineer, Planning Circle-I, PHE Dte. ORD/001624/2023-2024 4876/BD 29/12/2023 91 M/S B.K.ENTERPRISE. 0.43 1.03 100
1323 Barasat Division Hiring of 1 no. of Diesel Luxury Car (Euro - IV/VI) in good condition (traffic worthy) on daily basis for office use of the Assistant Engineer, Habra Sub-Division, under Barasat Division P.H.E. Dte. (For the period from: 01.12.2023 to 30.11.24) ORD/001630/2023-2024 720/HAB 23/11/2023 366 M/S LATIKA CONSTRUCTION. 1.74 3.89 60
1324 Barasat Division Acceptance cum work order for Construction of Anchor block for resting of 100 mm dia DI Distribution main for low areas at different places within Rupmari w/s scheme, Hingalganj Block under Hasnabad Sub-Division P.H.E. Dte. ORD/001644/2021-2022 400/HSD 04/03/2022 15 M/S PROGATI ENTERPRISE. 3.86 3.86 1
1325 Barasat Division Acceptance cum work order for Laying of 100 mm dia. DI distribution main from near PH No-3 towards Halda more for damage portion within Rupmari w/s scheme (Zone-III), Hingalganj Block under Hasnabad Sub- Division P.H.E. Dte. ORD/001646/2021-2022 402/HSD 04/03/2022 10 M/S PROGATI ENTERPRISE. 1.53 1.53 1
1326 Barasat Division Acceptance cum work order for Protection of newly laid UPVC pipe line for providing FHTC by bamboo pilling at different places within Rupmari w/s scheme, Hingalganj block under Hasnabad Sub- Division P.H.E. Dte. ORD/001647/2021-2022 403/HSD 04/03/2022 10 M/S DATTA ENTERPRISE. 4.93 4.91 1
1327 Barasat Division Acceptance cum work order for Protection of newly laid different dia. UPVC distribution pipeline for providing FHTC by UC bullah pile at different places within Rupmari w/s scheme, Hingalganj block under Hasnabad Sub- Division P.H.E. Dte. ORD/001648/2021-2022 404/HSD 04/03/2022 10 M/S PROGATI ENTERPRISE. 4.95 5.00 1
1328 Barasat Division Acceptance cum work order for Construction of Anchor block for resting of different dia DI Rising/Distribution main for low areas at different places for Rejuvenation of Baunia Abad w/s scheme, Sandeshkhali-I Block under Hasnabad Sub-Division P.H.E. Dte. (Part-A) ORD/001661/2021-2022 415/HSD 04/03/2022 15 M/S PROGATI ENTERPRISE. 4.71 0.00 1
1329 Barasat Division Acceptance cum work order for Construction of Anchor block for resting of different dia DI Rising/Distribution main for low areas at different places for Rejuvenation of Baunia Abad w/s scheme, Sandeshkhali-I Block under Hasnabad Sub-Division P.H.E. Dte. (Part-B) ORD/001662/2021-2022 416/HSD 04/03/2022 15 M/S DATTA ENTERPRISE. 4.04 4.04 1
1330 Barasat Division Acceptance cum work order for Sinking of 2 nos. 300 mm. x 200 mm. dia. 360 mtr deep Tubewell by D.R. Rig method at PH No.-1 & 2 with PVC pipe & strainer having 300mm dia 48 mtr. long housing pipe & 200mm dia 30 mtr. long filter for Augmentation of Chandpur w/s scheme (Z-I), Hasnabad block under Hasnabad Sub-Division, P.H.E. Dte. ORD/001664/2023-2024 294/BD 30/01/2024 45 M/S K.P.PAL. 51.76 23.03 100
1331 Barasat Division Acceptance cum work order for Protection of newly laid UPVC pipe line by bamboo pilling at different places for Rejuvenation of Monipur w/s scheme, Sandeshkhali-II block under Hasnabad Sub- Division P.H.E. Dte. ORD/001666/2021-2022 420/HSD 04/03/2022 10 UNIFIED ENGINEERS' CO-OPERATIVE SOCIETYLTD. 4.82 4.98 1
1332 Barasat Division Acceptance cum work order for Protection of newly laid different dia. UPVC distribution pipeline for providing FHTC by UC bullah pile at different places within Bouthakurani w/s scheme (Zone-I to III), Sandeshkhali-II block under Hasnabad Sub- Division P.H.E. Dte. ORD/001667/2021-2022 421/HSD 04/03/2022 10 SRI KRISHNA CO-OP-LABOUR CONTRACT AND CONST SOC LTD. 4.73 4.78 1
1333 Barasat Division Acceptance cum work order for Protection of newly laid different dia. UPVC distribution pipeline for providing FHTC by UC bullah pile at different places within Bouthakurani w/s scheme (Zone-IV to V), Sandeshkhali-II block under Hasnabad Sub- Division P.H.E. Dte. ORD/001668/2021-2022 422/HSD 04/03/2022 10 SRI KRISHNA CO-OP-LABOUR CONTRACT AND CONST SOC LTD. 4.73 4.73 1
1334 Barasat Division Acceptance cum work order for Sinking of 2 nos. 300 mm. x 200 mm. dia. 360 mtr deep Tubewell by D.R. Rig method at PH No.-1 & 2 with PVC pipe & strainer having 300mm dia 48 mtr. long housing pipe & 200mm dia 30 mtr. long filter for Augmentation of Bermajur w/s scheme, Sandeshkhali-II block under Hasnabad Sub-Division, P.H.E. Dte. ORD/001668/2023-2024 296/BD 30/01/2024 45 M/S RAJPATH CONSTRUCTION. 51.76 12.59 100
1335 Barasat Division Acceptance cum work order for Sinking of 2 nos. 300 mm. x 200 mm. dia. 360 mtr deep Tubewell by D.R. Rig method at PH No.-3 & 4 with PVC pipe & strainer having 300mm dia 48 mtr. long housing pipe & 200mm dia 30 mtr. long filter for Augmentation of Kalitala w/s scheme (Zone-II), Hingalganj block under Hasnabad Sub-Division, P.H.E. Dte. ORD/001681/2023-2024 529/BD 20/02/2024 45 UTPAL CONSTRUCTION & CO. 61.24 46.06 100
1336 Barasat Division Acceptance cum work order for Sinking of 2 nos. 300 mm. x 200 mm. dia. 360 mtr deep Tubewell by D.R. Rig method at PH No.-3 & 4 with PVC pipe & strainer having 300mm dia 48 mtr. long housing pipe & 200mm dia 30 mtr. long filter for Augmentation of Kalitala w/s scheme (Zone-I), Hingalganj block under Hasnabad Sub-Division, P.H.E. Dte. ORD/001682/2023-2024 528/BD 20/02/2024 45 UTPAL CONSTRUCTION & CO. 61.24 45.07 100
1337 Barasat Division Acceptance cum work order for Sinking of 2 nos. 300 mm. x 200 mm. dia. 360 mtr deep Tubewell by D.R. Rig method at PH No.-1 & 2 with PVC pipe & strainer having 300mm dia 48 mtr. long housing pipe & 200mm dia 30 mtr. long filter for Augmentation of Sahebkhali w/s scheme (Zone-I), Hingalganj block under Hasnabad Sub-Division, P.H.E. Dte. ORD/001683/2023-2024 526/BD 20/02/2024 45 UTPAL CONSTRUCTION & CO. 61.24 48.73 100
1338 Barasat Division Acceptance cum work order for inking of 2 nos. 300 mm. x 200 mm. dia. 360 mtr deep Tubewell by D.R. Rig method at PH No.-1 & 2 with PVC pipe & strainer having 300mm dia 48 mtr. long housing pipe & 200mm dia 30 mtr. long filter for Augmentation of Hingalganj w/s scheme (Zone-II), Hingalganj block under Hasnabad Sub-Division, P.H.E. Dte. ORD/001684/2023-2024 525/BD 20/02/2024 45 UTPAL CONSTRUCTION & CO. 49.99 38.62 100
1339 Barasat Division Formal work order for Name of Work: Laying Distribution System including construction of Surface drain, Land development and allied works at Zonal Head work with repair & renovation of 450 cum & 700 cum capacity OHR, Chlorine & Guard Room, Boundary wall at Head Works of Zone-I & II respectively with construction (Zone-III) of 500 cum capacity OHR, Chlorine & Guard Room and Boundary wall for Augmentation of Mathurabil surface based Water supply scheme at Zone-I,II & III of JJM within Barrackpore-I Block in the district North 24Parganas under Barasat Division, P.H.E Dte. ORD/001696/2023-2024 353/BD 02/02/2024 730 UMWELT ENGINEER PVT.LTD. 2,105.41 1,200.97 90
1340 Barasat Division Acceptance cum work order for Hire and labour charges for staging and scaffolding, bamboo baricading and removal of rubbish for dismantling of existing OHR at Head work Site of Sindrani Zone-I Water Supply Scheme Bagdah Block within the jurisdiction of Bongaon Sub-Division under Barasat Division, P.H.E. Dte. ORD/001698/2024-2025 704/BD 06/03/2025 60 ONKAR ENTERPRISE. 7.10 0.00 0
1341 Barasat Division Acceptance cum work order for Hire and labour charges for staging and scaffolding, bamboo baricading and removal of rubbish for dismantling of existing OHR at Head work Site of Sindrani Zone-II Water Supply Scheme Bagdah Block within the jurisdiction of Bongaon Sub-Division under Barasat Division, P.H.E. Dte. ORD/001700/2024-2025 707/BD 06/03/2025 60 ONKAR ENTERPRISE. 7.10 0.00 0
1342 Barasat Division Acceptance cum work order for Construction of additional 1 no. switch room cum chlorine room (5.40x3.60) with sanitary and water supply arrangement including plinth protection at Joygopalpur tail end within Tushkhali w/s scheme, Sandeshkhali-II block under Hasnabad Sub-Division, P.H.E. Dte. ORD/001704/2024-2025 951/BD 25/03/2025 75 SABIR ALI GAZI 8.92 0.00 0
1343 Barasat Division Acceptance cum work order for Repairing of Pump House at PH No- 1, 2 & 3 in connection with augmentation of Khulna Bhandarkhali w/s scheme (Zone-II), Sandeshkhali-II block under Hasnabad Sub-Division P.H.E. Dte. ORD/001711/2024-2025 895/BD 20/03/2025 75 GAZI ENTERPRISE 5.52 0.00 0
1344 Barasat Division Acceptance cum work order for Emergent restoration of existing pilling works to sustain the protection of UPVC distribution pipe line at different places within Khulna Bhanderkhali w/s scheme (Zone-I), Sandeshkhali-II block under Hasnabad Sub- Division P.H.E. Dte. ORD/001719/2021-2022 1981/HSD 02/12/2021 10 M/S NIRMAN CONSTRUCTION. 3.54 3.54 1
1345 Barasat Division Acceptance cum work order for Additional Laying of 63 mm dia. UPVC pipe line for Providing FHTC in connection with JJM and Jal Swapna at diff. places in Parghumti Mouza within Kalitala W/S scheme, Hingalganj block under Hasnabad Sub-Division within Barasat Division, PHE Dte. ORD/001720/2021-2022 257/HSD 07/02/2022 10 MONDAL & CO. (BASIRHAT). 4.52 4.52 1
1346 Barasat Division Acceptance cum work order for Renovation and repairing of Boundary wall at Head Work site for Augmentation of Sindrani (Zone-II) Water Supply Scheme, Bagdah Block within the jurisdiction of Bongaon Sub-Division under Barasat Division, P.H.E. Dte. ORD/001728/2023-2024 522/BD 20/02/2024 30 A.D.ENTERPRISE. 16.87 16.86 100
1347 Barasat Division Acceptance cum work order for Renovation and repairing of Boundary wall at Head Work site for Augmentation of Kurulia (Zone-I & II) Water Supply Scheme, Bagdah Block within the jurisdiction of Bongaon Sub-Division under Barasat Division, P.H.E. Dte. ORD/001729/2023-2024 521/BD 20/02/2024 30 PRABIR KUMAR MONDAL. 13.94 7.45 100
1348 Barasat Division Acceptance cum work order for Providing Functional Household Tap Connection (FHTC) for left out house holds under the command area of Kalinagar water supply scheme (Z-I) in order to provide Har Ghar Jal Certification, Sandeshkhali-I Block under Hasnabad Sub-Division, PHE Dte. ORD/001730/2023-2024 429/BD 09/02/2024 30 ABDUL ALIM MONDAL. 70.78 44.11 75
1349 Barasat Division Acceptance cum Work Order for Providing Functional Household Tap Connection (FHTC) in connection with Jal Jeevan Mission (JJM and Jal Swapna) under command area of Gadpukuria Water Supply Scheme at Bagdah Block under Barasat Division, PHE Dte. (Phase-II). ORD/001732/2020-2021 423/BD. 19/02/2021 45 M/S S.S.ENTERPRISE. (SOUTH) 84.66 49.40 1
1350 Barasat Division Acceptance cum work order for Construction of Boundary wall at Head Work site for Augmentation of Kamlabas Water Supply Scheme, Bagdah Block within the jurisdiction of Bongaon Sub-Division under Barasat Division, P.H.E. Dte. ORD/001738/2023-2024 534/BD 21/02/2024 45 REAL TIME 12.89 13.25 100
1351 Barasat Division Acceptance cum work order for Renovation and repairing of Boundary wall at Head Work site for Augmentation of Krishnachandrapur Water Supply Scheme, Bongaon Block within the jurisdiction of Bongaon Sub-Division under Barasat Division, P.H.E. Dte. ORD/001739/2023-2024 535/BD 21/02/2024 45 ANKUSH CONSTRUCTION & CO. 17.78 17.76 100
1352 Barasat Division Acceptance cum work order for Renovation and repairing of Boundary wall at Head Work site for Augmentation of Panchita Water Supply Scheme, Bongaon Block within the jurisdiction of Bongaon Sub-Division under Barasat Division, P.H.E. Dte. ORD/001740/2023-2024 536/BD 21/02/2024 45 PRABIR KUMAR MONDAL. 14.25 0.00 100
1353 Barasat Division Acceptance cum work order for Renovation and repairing of Boundary wall at Head Work site for Augmentation of Bharatpur Water Supply Scheme, Bongaon Block within the jurisdiction of Bongaon Sub-Division under Barasat Division, P.H.E. Dte. ORD/001742/2023-2024 538/BD 21/02/2024 45 LAXMEE ENTERPRISE 7.27 7.18 100
1354 Barasat Division Acceptance cum work order for Renovation and repairing of Boundary wall at 1st Tube Well & 2nd Tube Well site and Construction of Approach Road at 1st Tube Well & 2nd Tube Well site under Augmentation of Chhaygharia (Zone-I) Water Supply Scheme, Bongaon Block within the jurisdiction of Bongaon Sub-Division under Barasat Division, P.H.E. Dte. ORD/001743/2023-2024 559/BD 22/02/2024 495 KAMAL HALDER. 7.20 3.15 60
1355 Barasat Division Acceptance cum work order for Construction of Boundary wall at 1st Tube well site for Augmentation of Kalupur Water Supply Scheme, Bongaon Block within the jurisdiction of Bongaon Sub-Division under Barasat Division, P.H.E. Dte. ORD/001744/2023-2024 560/BD 22/02/2024 45 MA CONSTRUCTION. 9.33 9.31 100
1356 Barasat Division Acceptance cum work order for Renovation and repairing of Boundary wall at 1st Tube Well & 2nd Tube Well site and Construction of Approach Road at 1st Tube Well & 2nd Tube Well site under Augmentation of Chhaygharia (Zone-III) Water Supply Scheme, Bongaon Block within the jurisdiction of Bongaon Sub-Division under Barasat Division, P.H.E. Dte. ORD/001745/2023-2024 561/BD 22/02/2024 45 ROY ENGINEERS. 10.23 9.86 100
1357 Barasat Division Acceptance cum work order for Repairing of Boundary wall and Construction of Approach Road at Head Work site & 2nd Pump House site under Augmentation of Matiagachha Water Supply Scheme, Habra-II Block within the jurisdiction of Bongaon Sub-Division under Barasat Division, P.H.E. Dte. ORD/001746/2023-2024 563/BD 22/02/2024 45 M/S SANDHYA CONSTRUCTION 9.88 9.87 100
1358 Barasat Division Acceptance cum work order for Repairing of Boundary wall and Construction of Approach Road at Head Work site, 2nd Pump House Site & 3rd Pump House Site under Augmentation of Shimulpur Water Supply Scheme, Gaighata Block within the jurisdiction of Bongaon Sub-Division under Barasat Division, P.H.E. Dte. ORD/001747/2023-2024 564/BD 22/02/2024 45 M/S SUKANTA ENTERPRISE. 12.72 12.70 100
1359 Barasat Division Acceptance cum work order for Supply of sluice valve i/c Construction of Sluice valve chamber and other allied works at different location within Bouthakurani w/s scheme, Sandeshkhali-II Block under Hasnabad Sub- Division P.H.E. Dte. ORD/001748/2021-2022 464/HSD 10/03/2022 10 R.K.MANDAL AND CO. 3.39 3.39 1
1360 Barasat Division Acceptance cum work order for Repairing of Boundary wall at Head Work site, Construction of Boundary wall at 2nd Pump House site and Construction of Approach Road at Head Work site and 2nd T/W Site under Augmentation of Ramnagar Water Supply Scheme, Gaighata Block within the jurisdiction of Bongaon Sub-Division under Barasat Division, P.H.E. Dte. ORD/001748/2023-2024 565/BD 22/02/2024 45 JP CONSTRUCTION & SUPPLIERS. 12.84 12.65 100
1361 Barasat Division Acceptance cum work order for Repairing of Boundary wall and Construction of Approach Road at Head Work site and 2nd Pump House site under Augmentation of Ashudi Water Supply Scheme, Habra-II Block within the jurisdiction of Bongaon Sub-Division under Barasat Division, P.H.E. Dte. ORD/001749/2023-2024 571/BD 22/02/2024 45 BHABANI ENTERPRISE. 10.39 10.11 100
1362 Barasat Division Acceptance cum work order for Protection of newly laid UPVC pipe line for providing FHTC by bamboo pilling at different places within Bouthakurani w/s scheme, Sandeshkhali-II block under Hasnabad Sub- Division P.H.E. Dte. ORD/001750/2021-2022 465/HSD 10/03/2022 10 R.K.MANDAL AND CO. 4.85 4.85 1
1363 Barasat Division Acceptance cum work order for Construction of Boundary wall at 2nd Tube Well site and Construction of Approach Road at 1st T/W & 2nd T/W site under Augmentation of Kalupur Water Supply Scheme, Bongaon Block within the jurisdiction of Bongaon Sub-Division under Barasat Division, P.H.E. Dte. ORD/001751/2023-2024 562/BD 22/02/2024 45 RAJ ENTERPRISE. 7.53 7.52 100
1364 Barasat Division Acceptance cum work order for Construction of Boundary wall at Head Work site for Augmentation of Kola Water Supply Scheme, Bagdah Block within the jurisdiction of Bongaon Sub-Division under Barasat Division, P.H.E. Dte. ORD/001758/2023-2024 524/BD 20/02/2024 30 DEL DELTA CONSTRUCTION 13.55 10.71 85
1365 Barasat Division Acceptance cum work order for Protection of newly laid different dia. UPVC distribution pipeline for providing FHTC by UC bullah pile at different places within Bermajur w/s scheme, Sandeshkhali-II block under Hasnabad Sub- Division P.H.E. Dte. ORD/001759/2021-2022 470/HSD 10/03/2022 10 ARBINA ENTERPRISE. 3.89 3.88 1
1366 Barasat Division Acceptance cum work order for Renovation and repairing of Boundary wall at Head Work site for Augmentation of Gangrapota Water Supply Scheme, Bongaon Block within the jurisdiction of Bongaon Sub-Division under Barasat Division, P.H.E. Dte. ORD/001759/2023-2024 519/BD 20/02/2024 30 S.D. CONSTRUCTION. 15.09 15.08 100
1367 Barasat Division Formal work order for "Providing Functional Household Tap Connection (FHTC) from existing and new proposed distribution system within the command area Malatipur & Chaita (Part) Mouzas under Sadiknagar Zone - II Water Supply Scheme at Basirhat - II Block Under Barasat Division, PHE Dte. ORD/001760/2020-2021 495/BD. 26/02/2021 90 ORIENT CONSTRUCTION. 97.09 56.62 1
1368 Barasat Division Acceptance cum work order for Balance FHTC works and Eucalyptus Bullah Pilling with earth filling in different location for protection of DI / UPVC distribution Pipe line for Augmentation of Akipur water supply scheme in Basirhat - II Block under Basirhat Sub-Division under Barasat Division, PHE Dte. ORD/001760/2023-2024 512/BD 20/02/2024 30 SUPER SKILL. 41.71 0.00 0
1369 Barasat Division Acceptance cum work order for Protection of newly laid different dia. UPVC distribution pipeline for providing FHTC by UC bullah pile at different places within Fakirtakia w/s scheme, Sandeshkhali-I block under Hasnabad Sub- Division P.H.E. Dte. (Part-A) ORD/001761/2021-2022 471/HSD 10/03/2022 10 JESMINE ENTERPRISE. 3.82 3.82 1
1370 Barasat Division Acceptance cum work order for Protection of newly laid different dia. UPVC distribution pipeline for providing FHTC by UC bullah pile at different places within Fakirtakia w/s scheme, Sandeshkhali-I block under Hasnabad Sub- Division P.H.E. Dte. (Part-B) ORD/001762/2021-2022 472/HSD 10/03/2022 10 M/S MITRA CONSTRUCTION. 3.89 3.89 1
1371 Barasat Division Acceptance cum work order for Renovation of 35 Cum/hr of capacity AIRP and allied works at Head work site for Augmentation of Hariharpur Water Supply Scheme under Bongaon Sub-Division, Barasat Division P.H.E. Dte. ORD/001765/2023-2024 511/BD 20/02/2024 60 DEBAPRASAD MONDAL. 38.43 38.24 100
1372 Barasat Division Formal work order for Additional laying of UPVC pipe with allied works to connect every house hold connection under Augmentation work at Simulpur W/S Scheme Gaighata Block within the jurisdiction of Bongaon Sub-Division under Barasat Division, P.H.E. Dte. ORD/001767/2023-2024 610/BD 27/02/2024 90 SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. 102.67 102.66 100
1373 Barasat Division Acceptance cum work order for Sinking of 2 nos. 300 mm. x 200 mm. dia. 250 mtr deep Tubewell by D.R. Rig method at PH No.-1 & 2 with PVC pipe & strainer having 300mm dia 48 mtr. long housing pipe & 200mm dia 30 mtr. long filter for Kachurhula w/s scheme (Zone-I), Minakhan block under Hasnabad Sub-Division, P.H.E. Dte. ORD/001768/2023-2024 553/BD 22/02/2024 495 SAHA CONSTRUCTION & CO 33.41 0.00 50
1374 Barasat Division Acceptance cum work order for Sinking of 1 (one) no. 250 mm. x 150 mm. big dia. 210 mtr deep Tubewell by D.R. Rig method having 250 mm dia 42.0 mtr. long PVC housing pipe & 150 mm dia 30.0 mtr. long filter for Augmentation Kashimpur Water Supply Scheme (2nd T/W Site) of Barasat Sub-Division under Barasat Division, PHE Dte. ORD/001770/2023-2024 587/BD 23/02/2024 30 SUBHAJIT SAHA 11.22 9.99 100
1375 Barasat Division Acceptance cum work order for Sinking of 1 (one) no. 250 mm. x 150 mm. big dia. 210 mtr deep Tubewell by D.R. Rig method having 250 mm dia 42.0 mtr. long PVC housing pipe & 150 mm dia 30.0 mtr. long filter for Augmentation Bamangachhi Water Supply Scheme (2nd T/W Site) of Barasat Sub-Division under Barasat Division, PHE Dte. ORD/001771/2023-2024 588/BD 23/02/2024 30 SUBHAJIT SAHA 11.22 10.88 100
1376 Barasat Division Acceptance cum work order for Repairing and renovation of Compressor Room for AIRP, Construction of Approach Road at 2nd Tube Well site and Construction of Boundary wall and Approach Road at Head Work and 2nd T/W site under Augmentation of Hariharpur Water Supply Scheme, Bagdah Block within the jurisdiction of Bongaon Sub-Division under Barasat Division, P.H.E. Dte. ORD/001781/2023-2024 625/BD 28/02/2024 45 JEET ENTERPRISE. 7.66 7.66 100
1377 Barasat Division Acceptance cum work order for Improvement of existing IEP & other related allied works and including adding 1 no. Polishing unit and Repairing & renovation of Compressor Room for Iron Elimination Plant under Augmentation of Ashudi Water Supply Scheme, Habra-II Block within the jurisdiction of Bongaon Sub-Division under Barasat Division, P.H.E. Dte. ORD/001782/2023-2024 626/BD 28/02/2024 45 R.K.MANDAL & CO. 22.68 22.16 100
1378 Barasat Division Acceptance cum work order for Improvement of existing IEP & other related allied works and including adding 1 no. Polishing unit and Repairing and renovation of Compressor Room for Iron Elimination Plant under Augmentation of Matiagachha Water Supply Scheme, Habra-II Block within the jurisdiction of Bongaon Sub-Division under Barasat Division, P.H.E. Dte. ORD/001783/2023-2024 627/BD 28/02/2024 45 R.K.MANDAL & CO. 23.11 23.03 100
1379 Barasat Division Acceptance cum work order for Improvement of Iron Elimination Plant and other related allied works and Repairing and renovation of Compressor Room for Iron Elimination Plant under Augmentation of Shimulpur Water Supply Scheme, Gaighata Block within the jurisdiction of Bongaon Sub-Division under Barasat Division, P.H.E. Dte. ORD/001784/2023-2024 628/BD 28/02/2024 45 TAPAN GHOSH. 6.03 1.59 100
1380 Barasat Division Acceptance cum work order for Improvement of Iron Elimination Plant and other related allied works and Construction of Approach Road at Head work site under Augmentation of Helencha Water Supply Scheme, Bagdah Block within the jurisdiction of Bongaon Sub-Division under Barasat Division, P.H.E. Dte. ORD/001785/2023-2024 629/BD 28/02/2024 585 NEER UDYOG 8.93 0.00 0
1381 Barasat Division Acceptance cum work order for Improvement of Iron Elimination Plant and other related allied works and Repairing & renovation of Compressor Room for Iron Elimination Plant under Augmentation of Ramnagar Water Supply Scheme, Gaighata Block within the jurisdiction of Bongaon Sub-Division under Barasat Division, P.H.E. Dte. ORD/001786/2023-2024 630/BD 28/02/2024 45 GHOSH CONSTRUCTION 5.97 5.96 100
1382 Barasat Division Acceptance cum work order for Withdrawing & relaying of existing UPVC distribution system along the same alignment due to widening and strengthening of Zilla Parishad road from Buzar Bagee Kalitala to Chatar Bagee inconnection with augmentation work at Godpukuria (Zone-II) W/S Scheme under Bagdah block within the jurisdiction of Bongaon Sub-Division, under Barasat Division, P.H.E. Dte. ORD/001790/2023-2024 652/BD 29/02/2024 30 R.K.MANDAL & CO. 8.92 8.81 100
1383 Barasat Division Acceptance cum work order for Construction of Boundary wall at Head Work site for Augmentation of Hariharpur Water Supply Scheme, Bagdah Block within the jurisdiction of Bongaon Sub-Division under Barasat Division, P.H.E. Dte. ORD/001791/2023-2024 648/BD 29/02/2024 30 A.D.ENTERPRISE. 13.35 13.34 100
1384 Barasat Division Continuation work order Hiring of 1 no. of Diesel Luxury Car (Euro - IV/VI) in good condition (traffic worthy) on daily basis for office use of the Assistant Engineer, For supervision of J.J.M. related work, executed within the entire Jurisdiction of Habra Sub-Division, under Barasat Division P.H.E. Dte.(For the period from: 01.03.2024 to 31.08.24) ORD/001795/2023-2024 211/HAB 28/02/2024 182 M/S SUKANTA ENTERPRISE. 0.87 1.97 0
1385 Barasat Division Acceptance cum work order for Emergency repairing of existing FHTC along with pipe line in connection with retrofitting work at different places of Hingalganj mouza within Hingalganj w/s scheme(Z-I), Hingalganj block under Hasnasbad Sub-Division, P.H.E.Dte. ORD/001800/2023-2024 219/HSD 29/02/2024 10 MONDAL & CO. (BASIRHAT). 0.97 0.97 100
1386 Barasat Division Acceptance cum work order for Emergency repairing of existing FHTC along with pipe line in connection with retrofitting work at different places of Mamudpur mouza within Hingalganj w/s scheme(Z-I), Hingalganj block under Hasnasbad Sub-Division, P.H.E.Dte. ORD/001801/2023-2024 220/HSD 29/02/2024 10 TRISHA ENTERPRISE & CO. 0.94 0.93 100
1387 Barasat Division Acceptance cum work order for Construction of RCC culvert, cut-off wall, approach road and other allied works at Over Head Reservoir site (HW site) for Kusangra w/s scheme, Minakhan block under Hasnabad Sub-Division P.H.E. Dte. ORD/001811/2023-2024 676/BD 01/03/2024 280 M/S GHOSH CONSTRUCTION. 8.58 7.78 90
1388 Barasat Division Acceptance cum work order for Emergency repairing of existing FHTC along with pipe line in connection with retrofitting work at different places of Kanmari mouza within Kanmari w/s scheme (Z-I), Sandeshkhali-I block under Hasnasbad Sub-Division, P.H.E.Dte. ORD/001813/2023-2024 231/HSD 29/02/2024 10 SARKAR ENTERPRISE 0.93 0.93 100
1389 Barasat Division Acceptance cum work order for Construction of RCC culvert, cut-off wall, approach road and other allied works at Over Head Reservoir site (HW site) for Jhikra w/s scheme, Minakhan block under Hasnabad Sub-Division P.H.E. Dte. ORD/001814/2023-2024 677/BD 01/03/2024 14 NURJAHAN ENTERPRISE. 8.50 7.51 86
1390 Barasat Division Acceptance cum work order for Emergency repairing of existing FHTC along with pipe line in connection with retrofitting work at different places of Nalkora mouza within Kanmari w/s scheme (Z-I), Sandeshkhali-I block under Hasnasbad Sub-Division, P.H.E.Dte. ORD/001815/2023-2024 232/HSD 29/02/2024 10 SARKAR ENTERPRISE 0.93 0.93 100
1391 Barasat Division Acceptance cum work order for Emergency repairing of existing FHTC along with pipe line in connection with retrofitting work at different places of Hatgachi mouza within Kanmari w/s scheme (Z-II), Sandeshkhali-I block under Hasnasbad Sub-Division, P.H.E.Dte. ORD/001816/2023-2024 233/HSD 29/02/2024 10 M/S PROGATI ENTERPRISE. 0.94 0.94 100
1392 Barasat Division Acceptance cum work order for Emergency repairing of existing FHTC along with pipe line in connection with retrofitting work at different places of Nazat mouza within Kanmari w/s scheme (Z-II), Sandeshkhali-I block under Hasnasbad Sub-Division, P.H.E.Dte. ORD/001818/2023-2024 234/HSD 29/02/2024 10 M/S PROGATI ENTERPRISE. 0.95 0.95 100
1393 Barasat Division Acceptance cum work order for 1 no. pump connection at PH No.-1 in connection with Augmentation for Fakirtakia water supply scheme, Sandeshkhali-I block under Hasnabad Sub-Division, P.H.E. Dte. ORD/001830/2023-2024 257/HSD 06/03/2024 10 BADAL GHOSH. 0.59 0.59 100
1394 Barasat Division Acceptance cum work order for Temporary approach road for movement of winch machine and other allied machineries at Head Work site in connection with Augmentation of Murarisha W/S scheme, Hasnabad block under Hasnabad Sub-Division P.H.E. Dte. ORD/001831/2023-2024 259/HSD 06/03/2024 10 S.S.ENTERPRISE. (BAMANGACHI) 0.94 0.94 37
1395 Barasat Division Acceptance cum work order for Construction of anchor block for resting of 150 mm dia DI pipeline at different places in connection with Augmentation of Rupmari w/s scheme (Z-II), Hingalganj block under Hasnabad Sub-Division P.H.E. Dte. ORD/001832/2023-2024 261/HSD 06/03/2024 10 M/S NIRMAN CONSTRUCTION. 0.93 0.93 100
1396 Barasat Division Acceptance cum work order for Construction of anchor block for resting of 150 mm dia DI pipeline at different places in connection with Augmentation of Rupmari w/s scheme (Z-I), Hingalganj block under Hasnabad Sub-Division P.H.E. Dte. ORD/001833/2023-2024 262/HSD 06/03/2024 10 M/S DATTA ENTERPRISE. 0.93 0.93 85
1397 Barasat Division Acceptance cum work order for Construction of anchor block for resting of 100 mm dia DI pipeline at different places in connection with Augmentation of Rupmari w/s scheme (Z-I), Hingalganj block under Hasnabad Sub-Division P.H.E. Dte. ORD/001834/2023-2024 264/HSD 06/03/2024 10 M/S DATTA ENTERPRISE. 0.93 0.93 85
1398 Barasat Division Installation of Har Ghar Jal (HGJ) Display Board at different village of verious PWSS of Amdanga Block within Barasat Sub Division under Barasat Division, P.H.E. Dte. Part-A ORD/001836/2023-2024 1116/BSD 09/02/2024 4 BIBHAS PAL. 0.88 0.88 89
1399 Barasat Division Acceptance cum work order for Construction of anchor block for resting of 150 mm dia DI pipeline at different places in connection with Augmentation of Murarisha w/s scheme, Hasnabad block under Hasnabad Sub-Division P.H.E. Dte. ORD/001837/2023-2024 268/HSD 06/03/2024 10 NEW MANGES INDUSTRIAL CORPORATION 0.92 0.91 100
1400 Barasat Division Installation of Har Ghar Jal (HGJ) Display Board at different village of verious PWSS of Amdanga Block within Barasat Sub Division under Barasat Division, P.H.E. Dte. Part-B ORD/001838/2023-2024 1116./1/BSD 09/02/2024 4 BIBHAS PAL. 0.88 0.88 100
1401 Barasat Division Installation of Har Ghar Jal (HGJ) Display Board at different village of verious PWSS of Amdanga Block within Barasat Sub Division under Barasat Division, P.H.E. Dte. Part-C ORD/001839/2023-2024 1116A/BSD 09/02/2024 4 M.R.CONSTRUCTION. 0.88 0.88 100
1402 Barasat Division Work Order for Providing Functional Household Tap Connection (FHTC) in connection with Jal Jeevan Mission (JJM and Jal Swapna) under command area of Talsa & Adjoining Mouzas Water Supply Scheme at Habra-II Block under Barasat Division, PHE Dte. (Phase-II). ORD/001841/2020-2021 388/BD. 18/02/2021 90 PUSPA ENTERPRISE. 84.95 20.23 1
1403 Barasat Division Installation of Har Ghar Jal (HGJ) Display Board at different village of verious PWSS of Deganga Block within Barasat Sub Division under Barasat Division, P.H.E. Dte. Part-A ORD/001841/2023-2024 1117/BSD 09/02/2024 4 M.R.CONSTRUCTION. 0.88 0.88 100
1404 Barasat Division Acceptance cum Work Order for Providing Functional Household Tap Connection (FHTC) from existing and new proposed distribution system within the command area of Shankarpur Supply Scheme at Basirhat-I Block under Barasat Division, PHE Dte. ORD/001842/2020-2021 488/BD. 26/02/2021 90 UMWELT ENGINEER PVT.LTD. 96.90 27.67 1
1405 Barasat Division Installation of Har Ghar Jal (HGJ) Display Board at different village of verious PWSS of Deganga Block within Barasat Sub Division under Barasat Division, P.H.E. Dte. Part-B ORD/001842/2023-2024 1117./1/BSD 09/02/2024 4 BIBHAS PAL. 0.88 0.88 100
1406 Barasat Division Installation of Har Ghar Jal (HGJ) Display Board at different village of verious PWSS of Deganga Block within Barasat Sub Division under Barasat Division, P.H.E. Dte. Part-C ORD/001843/2023-2024 1119./BSD 09/02/2024 4 S.M.TRADERS. 0.88 0.88 100
1407 Barasat Division Installation of Har Ghar Jal (HGJ) Display Board at different village of verious PWSS of Deganga Block within Barasat Sub Division under Barasat Division, P.H.E. Dte. Part-D ORD/001844/2023-2024 1119/1/BSD 09/02/2024 4 M.R.CONSTRUCTION. 0.88 0.88 100
1408 Barasat Division Acceptance cum work order for 2 nos. pump connection at PH No.-5 & 6 in connection with Augmentation for Hingalganj w/s (Z-II) scheme, Hingalganj block under Hasnabad Sub-Division, P.H.E. Dte. ORD/001845/2023-2024 271/HSD 06/03/2024 10 M/S RAJPATH CONSTRUCTION. 0.96 0.96 100
1409 Barasat Division Installation of Har Ghar Jal (HGJ) Display Board at different village of verious PWSS of Deganga Block within Barasat Sub Division under Barasat Division, P.H.E. Dte. Part-E ORD/001847/2023-2024 1120/BSD 09/02/2024 4 S.M.TRADERS. 0.87 0.87 100
1410 Barasat Division Acceptance cum work order for Construction of anchor block for resting of 200 mm dia DI pipeline at different places in connection with Augmentation of Murarisha w/s scheme, Hasnabad block under Hasnabad Sub-Division P.H.E. Dte. ORD/001848/2023-2024 274/HSD 06/03/2024 10 NEW MANGES INDUSTRIAL CORPORATION 0.95 0.94 80
1411 Barasat Division Installation of Har Ghar Jal (HGJ) Display Board at different villages of verious PWSS of Deganga Block within Barasat Sub Division under Barasat Division, P.H.E. Dte. Part-F ORD/001849/2023-2024 1120./1/BSD 09/02/2024 4 S.M.TRADERS. 0.87 0.87 100
1412 Barasat Division Acceptance cum work order for Temporary approach road for movement of winch machine and other allied machineries at Head Work site in connection with Augmentation of Rupmari w/s scheme (Z-I), Hingalganj block under Hasnabad Sub-Division P.H.E. Dte. ORD/001850/2023-2024 275/HSD 06/03/2024 10 SARKAR ENTERPRISE & CO. 0.83 0.83 79
1413 Barasat Division Acceptance cum Work Order for Providing Functional Household Tap Connection (FHTC) in different mouza including laying of UPVC/PVC pipe line and necessary fittings within Gabberia Water Supply Scheme at Sandeshkhali-II Block under Hsnabad Sub-Division, PHE Dte.(Phase-I) ORD/001851/2020-2021 435/BD. 22/02/2021 30 DEBAPRASAD MONDAL. 77.80 32.86 1
1414 Barasat Division Installation of Har Ghar Jal (HGJ) Display Board at different village of verious PWSS of Barasat-I Block within Barasat Sub Division under Barasat Division, P.H.E. Dte. Part-A ORD/001851/2023-2024 1121/BSD 09/02/2024 4 BIBHAS PAL. 0.88 0.88 100
1415 Barasat Division Acceptance cum work order for 2 nos. pump connection at PH No.-1 & 2 in connection with Augmentation for Durgamandop water supply scheme, Sandeshkhali-II block under Hasnabad Sub-Division, P.H.E. Dte. ORD/001852/2023-2024 276/HSD 06/03/2024 10 ANKUSH CONSTRUCTION & CO. 0.97 0.97 83
1416 Barasat Division Installation of Har Ghar Jal (HGJ) Display Board at different village of verious PWSS of Barasat-I Block within Barasat Sub Division under Barasat Division, P.H.E. Dte. Part-B ORD/001853/2023-2024 1121./1/BSD 09/02/2024 4 BIBHAS PAL. 0.88 0.88 100
1417 Barasat Division Laying of partly damaged UPVC pipe line at Nabajibonpally under Joypul Water Supply Scheme within Barasat Sub Division, P.H.E.Dte. ORD/001854/2023-2024 1133/BSD 12/02/2024 7 TALUKDER & CO. 0.87 0.73 100
1418 Barasat Division Hiring 1(One) No. Diesel Luxury Car on Daily basis. (for 6 months from w.e.f. 01.12.2023) for the office use of the Assistant Engineer, Barasat Sub Division, P.H.E. Dte. ORD/001855/2023-2024 857/BSD 29/11/2023 183 MADHAB CHANDRA DAS 0.87 1.98 0
1419 Barasat Division Acceptance cum work order for Emergent resting of 100 mm dia DI pipeline by concrete block at different places in connection with Augmentation of Malancha w/s scheme (Z-I), Minakhan block under Hasnabad Sub-Division P.H.E. Dte. ORD/001856/2023-2024 32/HSD 09/01/2024 10 NEW MANGES INDUSTRIAL CORPORATION 0.91 0.92 62
1420 Barasat Division Acceptance cum work order for 2 nos. pump connection at PH No.-1 & 2 in connection with Augmentation of Kumarjole water supply scheme, Minakhan block under Hasnabad Sub-Division, P.H.E. Dte. ORD/001857/2023-2024 37/HSD 09/01/2024 10 ABDUL ALIM MONDAL. 0.83 0.80 100
1421 Barasat Division Acceptance cum work order for Dismantling & Re-construction of boundary wall for movement of rig & other machineries for sinking of big dia TW at PH no-1 in connection with Augmentation of Barunhat Patlikhanpur w/s scheme (Z-I), Hasnabad block under Hasnabad Sub-Division P.H.E. Dte. ORD/001859/2023-2024 38/HSD 09/01/2024 10 SHYAM SUNDAR DAS. 0.93 0.88 100
1422 Barasat Division Special repair & renovation of boundary wall and other allied Works for Pump House No - 1 of Janaphul W/S scheme in connection with Augmentation work under JJM project within the jurisdiction of Habra Sub-Division under Barasat Division, P.H.E. Dte. ORD/001876/2023-2024 131/HAB 05/02/2024 20 DEBANJAN GHOSH. 0.77 0.77 100
1423 Barasat Division Acceptance cum work order for 1 no. pump connection at PH No.-1 in connection within Debitala water supply scheme , Minakhan block under Hasnabad Sub-Division, P.H.E. Dte. ORD/001883/2024-2025 528/HSD 10/03/2025 10 SARKAR ENTERPRISE 0.72 0.00 0
1424 Barasat Division Construction of Service Road (10 Mtr. Length & 2 Mtr. Width) for Pump House No:1 of Bergum Piped Water Supply Scheme in connection with Augmentation work under JJM project within the jurisdiction of Habra Sub-Division under Barasat Division, PHE Dte. ORD/001885/2023-2024 132/HAB 05/02/2024 15 DEBASISH SARKAR. 0.75 0.74 100
1425 Barasat Division Construction of Service Road (10 Mtr. Length & 2 Mtr. Wide while 1.00 Mtr existing Road ) for Pump House No:2 of Maslandapur II Piped Water Supply Scheme in connection with Augmentation work under JJM project within the jurisdiction of Habra Sub-Division under Barasat Division, PHE Dte. ORD/001886/2023-2024 134/HAB 05/02/2024 15 CHAKRABORTY SUPPLIERS & CONSTRUCTION. 0.75 0.73 100
1426 Barasat Division Special repair & renovation of pump house and other allied Works for Pump House No - 1 of Sadpur W/S scheme in connection with Augmentation work under JJM project within the jurisdiction of Habra Sub-Division under Barasat Division, P.H.E. Dte. ORD/001888/2023-2024 136/HAB 05/02/2024 15 JOY ENTERPRISE 0.45 0.44 100
1427 Barasat Division Acceptance cum work order for construction of Service Road(15 Mtr. Length X 2 Mtr. Width) for Pump House No:2 of Kankpul Water Supply Scheme in connection with Augmentation work under JJM project within the jurisdiction of Habra Sub-Division under Barasat Division, PHE Dte. ORD/001896/2023-2024 169/HAB 19/02/2024 15 M/S LATIKA CONSTRUCTION. 0.92 0.00 0
1428 Barasat Division Acceptance cum work order for Construction of Service Road (15 Mtr. Length X 2 Mtr. Width) for Pump House No:2 of Khosdelpur Water Supply Scheme in connection with Augmentation work under JJM project within the jurisdiction of Habra Sub-Division under Barasat Division, PHE Dte. ORD/001898/2023-2024 170/HAB 19/02/2024 15 M/S SUKANTA ENTERPRISE. 0.92 0.00 0
1429 Barasat Division Acceptance cum work order for Construction of Service Road(10 Mtr. Length X 2 Mtr. Width) for Pump House No:2 of Talsa & Adj Mouzas Water Supply Scheme in connection with Augmentation work undeer JJM project within the jurisdiction of Habra Sub-Division under Barasat Division, PHE Dte. ORD/001900/2023-2024 172/HAB 19/02/2024 15 M/S LATIKA CONSTRUCTION. 0.61 0.00 0
1430 Barasat Division Acceptance cum work order for Installation of scheme information board at different villages of various PWSS of Minakhan block within Hasnasbad Sub-Division under Barasat Division, P.H.E.Dte. (Part-I). ORD/001905/2023-2024 277/HSD 06/03/2024 10 BIBHAS PAL. 0.88 0.88 100
1431 Barasat Division Acceptance cum work order for 1 no. pump connection at PH No.-1 in connection within Bachra water supply scheme , Minakhan block under Hasnabad Sub-Division, P.H.E. Dte. ORD/001905/2024-2025 541/HSD 10/03/2025 10 M/S SOURAV DAS 0.72 0.00 0
1432 Barasat Division Acceptance cum work order for Installation of scheme information board at different villages of various PWSS of Minakhan block within Hasnasbad Sub-Division under Barasat Division, P.H.E.Dte. (Part-J). ORD/001906/2023-2024 278/HSD 06/03/2024 10 M.R.CONSTRUCTION. 0.88 0.00 100
1433 Barasat Division Acceptance cum work order for Installation of scheme information board at different villages of various PWSS of Minakhan block within Hasnasbad Sub-Division under Barasat Division, P.H.E.Dte. (Part-A). ORD/001908/2023-2024 280/HSD 06/03/2024 10 BIBHAS PAL. 0.87 0.87 100
1434 Barasat Division Acceptance cum work order for Installation of scheme information board at different villages of various PWSS of Minakhan block within Hasnasbad Sub-Division under Barasat Division, P.H.E.Dte. (Part-B). ORD/001909/2023-2024 281/HSD 06/03/2024 10 S.M.TRADERS. 0.88 0.00 100
1435 Barasat Division Acceptance cum work order for Providing Functional Household tap connection at Sitalia FP School, South Hatgacha Jr. High School, Dakshin Hatgacha Adibasi SSK and Uttar Hatgacha SSK within the command area of Khulna Bhanderkhaliw/s scheme, Sandeshkhali-II block under Hasnabad Sub- Division P.H.E. Dte. ORD/001909/2024-2025 543/HSD 10/03/2025 10 M/S RAJPATH CONSTRUCTION. 0.83 0.00 0
1436 Barasat Division Acceptance cum work order for Temporary approach road for movement of winch machine and other allied machineries at Head Work site within Mathbari Abad W/S scheme, Sandeshkhali-I block under Hasnabad Sub-Division P.H.E. Dte. ORD/001910/2023-2024 282/HSD 06/03/2024 10 M/S DATTA ENTERPRISE. 0.84 0.83 22
1437 Barasat Division Acceptance cum work order for Installation of scheme information board at different villages of various PWSS of Minakhan block within Hasnasbad Sub-Division under Barasat Division, P.H.E.Dte. (Part-C). ORD/001911/2023-2024 283/HSD 06/03/2024 10 BIBHAS PAL. 0.88 0.88 100
1438 Barasat Division Acceptance cum work order for Installation of scheme information board at different villages of various PWSS of Minakhan block within Hasnasbad Sub-Division under Barasat Division, P.H.E.Dte. (Part-D). ORD/001912/2023-2024 284/HSD 06/03/2024 10 BIBHAS PAL. 0.88 0.88 100
1439 Barasat Division Acceptance cum work order for 2 nos. pump connection at PH No.-3 in connection with Augmentation for Khulna Bhanderkhali water supply scheme (Z-I) , Sandeshkhali-II block under Hasnabad Sub-Division, P.H.E. Dte. ORD/001913/2023-2024 285/HSD 06/03/2024 10 DEB PRASAD GHOSH. 0.67 0.67 100
1440 Barasat Division Acceptance cum work order for Installation of scheme information board at different villages of various PWSS of Minakhan block within Hasnasbad Sub-Division under Barasat Division, P.H.E.Dte. (Part-E). ORD/001914/2023-2024 286/HSD 06/03/2024 10 BIBHAS PAL. 0.88 0.88 100
1441 Barasat Division Acceptance cum work order for Installation of scheme information board at different villages of various PWSS of Minakhan block within Hasnasbad Sub-Division under Barasat Division, P.H.E.Dte. (Part-F). ORD/001915/2023-2024 287/HSD 06/03/2024 10 M.R.CONSTRUCTION. 0.88 0.00 100
1442 Barasat Division Acceptance cum work order for Temporary approach road for movement of winch machine and other allied machineries at Head Work site in connectin with Augmentation of Baunia Abad W/S scheme, Sandeshkhali-I block under Hasnabad Sub-Division P.H.E. Dte. ORD/001916/2023-2024 288/HSD 06/03/2024 10 DEBAPRASAD MONDAL. 0.84 0.84 100
1443 Barasat Division Acceptance cum work order for Installation of scheme information board at different villages of various PWSS of Minakhan block within Hasnasbad Sub-Division under Barasat Division, P.H.E.Dte. (Part-G). ORD/001917/2023-2024 289/HSD 06/03/2024 10 S.M.TRADERS. 0.87 0.00 100
1444 Barasat Division Acceptance cum work order for Installation of scheme information board at different villages of various PWSS of Minakhan block within Hasnasbad Sub-Division under Barasat Division, P.H.E.Dte. (Part-H). ORD/001918/2023-2024 290/HSD 06/03/2024 10 BIBHAS PAL. 0.87 0.87 100
1445 Barasat Division Acceptance cum work order for Providing Functional household tap connection at Rajbari Purbapara SSK & Paschim Laukhali Sobahan Molla Smriti FP School, within the command area of Rajbari w/s scheme, Sandeshkhali-I block under Hasnabad Sub- Division P.H.E. Dte. ORD/001918/2024-2025 545/HSD 10/03/2025 10 SARKAR ENTERPRISE 0.50 0.00 0
1446 Barasat Division Acceptance cum work order for Installation of scheme information board at different villages of various PWSS of Minakhan block within Hasnasbad Sub-Division under Barasat Division, P.H.E.Dte. (Part-I). ORD/001919/2023-2024 291/HSD 06/03/2024 10 BIBHAS PAL. 0.87 0.00 100
1447 Barasat Division Acceptance cum work order for Installation of scheme information board at different villages of various PWSS of Minakhan block within Hasnasbad Sub-Division under Barasat Division, P.H.E.Dte. (Part-J). ORD/001920/2023-2024 292/HSD 06/03/2024 10 M.R.CONSTRUCTION. 0.88 0.00 100
1448 Barasat Division Acceptance cum work order for Protection of HDPE rising main pipe line by bamboo piling from near Krishnapada Smriti More to N/H/O Ramesh Gayen for Rejuvenation of Durgapur Baylani w/s scheme (Zone-I), Hingalganj Block under Hasnabad Sub-Division, PHE Dte. ORD/001924/2021-2022 527/HSD 15/03/2022 10 MONDAL & CO. (BASIRHAT). 4.47 4.47 1
1449 Barasat Division Acceptance cum work order for Sinking of 1 (one) no. 300 mm. x 200 mm. big dia. 300 mtr deep Tubewell by D.R. Rig method, with 300 mm dia 36.0 mtr. long PVC having 200mm dia 30 mtr. long filter for Augmentation of Raharati Water Supply Scheme in Basirhat-II Block of Basirhat Sub-Division under Barasat Division, PHE Dte. ORD/001924/2023-2024 769/BD 11/03/2024 30 SHEKH ENTERPRISE 21.75 0.00 0
1450 Barasat Division Acceptance cum work order for Sinking of 1 (one) no. 300 mm. x 200 mm. big dia. 185 mtr deep Tube well by D.R. Rig method having 300 mm dia 42.0 mtr. long PVC housing pipe & 200 mm dia 30.0 mtr. long filter for Augmentation Berachampa Zone-I Water Supply Scheme (Head Work Site) of Barasat Sub-Division under Barasat Division, PHE Dte. ORD/001925/2023-2024 802/BD 15/03/2024 30 ACME CONSTRUCTION 13.08 12.38 80
1451 Barasat Division Acceptance cum work order for Sinking of 1 (one) no. 300 mm. x 200 mm. big dia. 185 mtr deep Tube well by D.R. Rig method having 300 mm dia 42.0 mtr. long PVC housing pipe & 200 mm dia 30.0 mtr. long filter for Augmentation Berachampa Zone-III Water Supply Scheme (Head Work Site) of Barasat Sub-Division under Barasat Division, PHE Dte. ORD/001926/2023-2024 803/BD 12/03/2024 30 ACME CONSTRUCTION 13.08 12.38 100
1452 Barasat Division Acceptance cum work order for Sinking of 1 (one) no. 300 mm. x 200 mm. big dia. 185 mtr deep Tubewell by D.R. Rig method having 300 mm dia 42.0 mtr. long PVC housing pipe & 200 mm dia 30.0 mtr. long filter for Augmentation Berachampa Zone-V Water Supply Scheme (Head Work Site) of Barasat Sub-Division under Barasat Division, PHE Dte. ORD/001927/2023-2024 804/BD 12/03/2024 30 ACME CONSTRUCTION 13.08 12.47 100
1453 Barasat Division Acceptance cum work order for the work of Hiring Diesel Luxury Car on daily basis for the Office of the Dy. Superintending Engineer-I, Monitoring Cell, PHE Dte. (Period from 01-04-2024 to 30-09-2024). ORD/001928/2023-2024 914/BD 15/03/2024 183 DIPANKAR NASKAR. 0.87 1.20 100
1454 Barasat Division Construction of pathway & Land development at H/W site of Dakshin Debipur Water Supply Scheme under Basirhat-Il Block under Basirhat Sub-Division, P.H.E. Dte. ORD/001929/2021-2022 380/BHTSD 17/03/2022 20 M/S MITRA CONSTRUCTION. 3.27 3.17 1
1455 Barasat Division Acceptance cum work order for Sinking of 3 nos. 300 mm. x 200 mm. dia. 360 mtr deep Tubewell by D.R. Rig method at PH No.-3, 4 & 5 with PVC pipe & strainer having 300mm dia 48 mtr. long housing pipe & 200mm dia 30 mtr. long filter for Augmentation of Sahebkhali w/s scheme (Z-I), Hingalganj block under Hasnabad Sub-Division, P.H.E. Dte. ORD/001932/2023-2024 915/BD 15/03/2024 60 SRI KRISHNA CO-OP-LABOUR CONTRACT AND CONST SOC LTD. 94.87 71.18 100
1456 Barasat Division Route Survey, Design Drawing & DPR Preparation for ITINDA PANITOR Water Supply Scheme in Basirhat-I Block under Barasat Division, PHE Dte. ORD/001933/2021-2022 189/BHTSD 28/02/2022 15 SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. 4.84 4.84 1
1457 Barasat Division Acceptance cum work order for Sinking of 3 nos. 300 mm. x 200 mm. dia. 360 mtr deep Tube well by D.R. Rig method at PH No.-1, 2 & 3 with PVC pipe & strainer having 300mm dia 48 mtr. long housing pipe & 200mm dia 30 mtr. long filter for Augmentation of Bhabanipur w/s scheme (Z-II), Hasnabad block under Hasnabad Sub-Division, P.H.E. Dte. ORD/001933/2023-2024 916/BD 15/03/2024 60 M/S K.P.PAL. 89.28 59.32 100
1458 Barasat Division Route Survey, Design Drawing & DPR Preparation for PIFA Water Supply Scheme in Basirhat-I Block under Barasat Division, PHE Dte. ORD/001934/2021-2022 190/BHTSD 28/02/2022 15 SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. 3.73 3.65 1
1459 Barasat Division Acceptance cum work order for Installation of scheme information board at different villages of various PWSS of Hasnabad block within Hasnasbad Sub-Division under Barasat Division, P.H.E.Dte. (Part-A). ORD/001934/2023-2024 256/HSD 06/03/2024 10 BIBHAS PAL. 0.88 0.88 100
1460 Barasat Division Acceptance cum work order for Construction of additional 1 no. switch room cum chlorine room (5.40x3.60) with sanitary and water supply arrangement including plinth protection in connection with augmentation of Dakshin Bhebia W/s scheme (Z-I), Hasnabad block under Hasnabad Sub-Division, P.H.E. Dte. ORD/001934/2024-2025 1024/BD 28/03/2025 75 ABDUR RAHIM GAZI 7.49 0.00 0
1461 Barasat Division Route Survey, Design Drawing & DPR Preparation for DEBHOG Water Supply Scheme in Basirhat-I Block under Barasat Division, PHE Dte. ORD/001935/2021-2022 191/BHTSD 28/02/2022 15 SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. 3.70 3.60 1
1462 Barasat Division Route Survey, Design Drawing & DPR Preparation for SANKARPUR Water Supply Scheme in Basirhat-I Block under Barasat Division, PHE Dte. ORD/001936/2021-2022 192/BHTSD 28/02/2022 15 SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. 4.24 4.24 1
1463 Barasat Division Acceptance cum work order for Installation of scheme information board at different villages of various PWSS of Hasnabad block within Hasnasbad Sub-Division under Barasat Division, P.H.E.Dte. (Part-C). ORD/001936/2023-2024 260/HSD 06/03/2024 10 BIBHAS PAL. 0.88 0.88 100
1464 Barasat Division Route Survey, Design Drawing & DPR Preparation for GOKNASREE GOBINDAPUR Water Supply Scheme in Basirhat-I Block under Barasat Division, PHE Dte. ORD/001937/2021-2022 193/BHTSD 28/02/2022 15 SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. 3.73 3.63 1
1465 Barasat Division Acceptance cum work order for Installation of scheme information board at different villages of various PWSS of Hasnabad block within Hasnasbad Sub-Division under Barasat Division, P.H.E.Dte. (Part-D). ORD/001937/2023-2024 263/HSD 06/03/2024 10 S.M.TRADERS. 0.88 0.88 100
1466 Barasat Division Route Survey, Design Drawing & DPR Preparation for PAIKARDANGA Water Supply Scheme in Basirhat-I Block under Barasat Division, PHE Dte. ORD/001938/2021-2022 194/BHTSD 28/02/2022 15 SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. 4.84 4.84 1
1467 Barasat Division Acceptance cum work order for Installation of scheme information board at different villages of various PWSS of Hasnabad block within Hasnasbad Sub-Division under Barasat Division, P.H.E.Dte. (Part-E). ORD/001938/2023-2024 265-HSD. 06/03/2024 10 BIBHAS PAL. 0.88 0.88 100
1468 Barasat Division Acceptance cum work order for Installation of scheme information board at different villages of various PWSS of Hasnabad block within Hasnasbad Sub-Division under Barasat Division, P.H.E.Dte. (Part-F). ORD/001939/2023-2024 267/HSD 06/03/2024 10 BIBHAS PAL. 0.88 0.88 100
1469 Barasat Division Route Survey, Design Drawing & DPR Preparation for GOTRA Water Supply Scheme in Basirhat-I Block under Barasat Division, PHE Dte. ORD/001940/2021-2022 196/BHTSD 28/02/2022 15 SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. 4.30 4.16 1
1470 Barasat Division Acceptance cum work order for Installation of scheme information board at different villages of various PWSS of Hasnabad block within Hasnasbad Sub-Division under Barasat Division, P.H.E.Dte. (Part-B). ORD/001940/2023-2024 258/HSD 06/03/2024 10 M.R.CONSTRUCTION. 0.88 0.88 100
1471 Barasat Division Route Survey, Design Drawing & DPR Preparation for PASCHIM MADHYAMPUR Water Supply Scheme in Basirhat-I Block under Barasat Division, PHE Dte. ORD/001941/2021-2022 197/BHTSD 28/02/2022 15 SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. 4.24 0.00 1
1472 Barasat Division Acceptance cum work order for Installation of scheme information board at different villages of various PWSS of Hasnabad block within Hasnasbad Sub-Division under Barasat Division, P.H.E.Dte. (Part-G). ORD/001941/2023-2024 270/HSD 06/03/2024 10 M.R.CONSTRUCTION. 0.88 0.88 100
1473 Barasat Division Route Survey, Design Drawing & DPR Preparation for BANSJHARI MALLIKPUR Water Supply Scheme in Basirhat-I Block under Barasat Division, PHE Dte. ORD/001942/2021-2022 198/BHTSD 28/02/2022 15 SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. 3.29 3.27 1
1474 Barasat Division Acceptance cum work order for Installation of scheme information board at different villages of various PWSS of Hasnabad block within Hasnasbad Sub-Division under Barasat Division, P.H.E.Dte. (Part-H). ORD/001942/2023-2024 273/HSD 06/03/2024 10 S.M.TRADERS. 0.88 0.88 100
1475 Barasat Division Route Survey, Design Drawing & DPR Preparation for GACHHARATI Water Supply Scheme in Basirhat-I Block under Barasat Division, PHE Dte. ORD/001943/2021-2022 199/BHTSD 28/02/2022 15 SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. 2.69 0.00 1
1476 Barasat Division Route Survey, Design Drawing & DPR Preparation for DAKSHIN BAGUNDI Water Supply Scheme in Basirhat-I Block under Barasat Division, PHE Dte. ORD/001944/2021-2022 200/BHTSD 28/02/2022 15 SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. 2.76 2.63 1
1477 Barasat Division Route Survey, Design Drawing & DPR Preparation for SANKCHURA Water Supply Scheme in Basirhat-I Block under Barasat Division, PHE Dte. ORD/001945/2021-2022 201/BHTSD 28/02/2022 15 SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. 4.37 4.25 1
1478 Barasat Division Route Survey, Design Drawing & DPR Preparation for NALKORA Water Supply Scheme in Basirhat-I Block under Barasat Division, PHE Dte. ORD/001946/2021-2022 202/BHTSD 28/02/2022 15 SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. 2.79 0.00 1
1479 Barasat Division Continuation Work Order for Hiring of 1(one) number vehicle of Category Motor Cab/Maruti Omni(standard)(Non Air-Conditioned)/LPG/CNG Engine including Driver for performing the inspection works and official duties for the office of the Assistant Engineer, Barrackpore Sub-Division, P.H.E. Dte. at Barrackpore, Kolkata-700122, District- North 24Pgns, W.B.(Period from 01.02. 2024 to 31.07.2024) ORD/001946/2023-2024 43/BKP 22/01/2024 182 GOPAL SINGHA. 0.86 1.95 100
1480 Barasat Division Route Survey, Design Drawing & DPR Preparation for ZAFARPUR Water Supply Scheme in Basirhat-II Block under Barasat Division, PHE Dte. ORD/001947/2021-2022 203/BHTSD 28/02/2022 15 SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. 4.30 4.19 1
1481 Barasat Division Route Survey, Design Drawing & DPR Preparation for TYANTRA NEORA Water Supply Scheme in Basirhat-II Block under Barasat Division, PHE Dte. ORD/001948/2021-2022 204/BHTSD 28/02/2022 15 SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. 2.94 2.51 0
1482 Barasat Division Route Survey, Design Drawing & DPR Preparation for GOBINDAPUR DHOKRA Water Supply Scheme in Basirhat-II Block under Barasat Division, PHE Dte. ORD/001949/2021-2022 205/BHTSD 28/02/2022 15 SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. 3.86 0.00 1
1483 Barasat Division Route Survey, Design Drawing & DPR Preparation for SADIKNAGAR-I Water Supply Scheme in Basirhat-II Block under Barasat Division, PHE Dte. ORD/001950/2021-2022 206/BHTSD 28/02/2022 15 SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. 4.15 0.00 1
1484 Barasat Division Route Survey, Design Drawing & DPR Preparation for SADIKNAGAR-II Water Supply Scheme in Basirhat-II Block under Barasat Division, PHE Dte. ORD/001951/2021-2022 207/BHTSD 28/02/2022 15 SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. 3.51 3.50 1
1485 Barasat Division Route Survey, Design Drawing & DPR Preparation for AKIPUR Water Supply Scheme in Basirhat-II Block under Barasat Division, PHE Dte. ORD/001953/2021-2022 304/BHTSD 07/03/2022 15 SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. 3.02 2.95 1
1486 Barasat Division Route Survey, Design Drawing & DPR Preparation for MAMINPUR Water Supply Scheme in Basirhat-II Block under Barasat Division, PHE Dte. ORD/001954/2021-2022 305/BHTSD 07/03/2022 15 SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. 3.15 0.00 1
1487 Barasat Division Route Survey, Design Drawing & DPR Preparation for EOJNAGAR Water Supply Scheme in Basirhat-II Block under Barasat Division, PHE Dte. ORD/001955/2021-2022 306/BHTSD 07/03/2022 15 SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. 3.94 3.86 1
1488 Barasat Division Route Survey, Design Drawing & DPR Preparation for MIRZANAGAR Water Supply Scheme in Basirhat-II Block under Barasat Division, PHE Dte. ORD/001956/2021-2022 307/BHTSD 07/03/2022 15 SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. 3.78 3.69 1
1489 Barasat Division Route Survey, Design Drawing & DPR Preparation for KACHUA SWARUPNAGAR Water Supply Scheme in Basirhat-II Block under Barasat Division, PHE Dte. ORD/001957/2021-2022 308/BHTSD 07/03/2022 15 SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. 4.29 4.07 1
1490 Barasat Division Route Survey, Design Drawing & DPR Preparation for GHONA Water Supply Scheme in Basirhat-II Block under Barasat Division, PHE Dte. ORD/001958/2021-2022 309/BHTSD 07/03/2022 15 SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. 3.15 3.15 1
1491 Barasat Division Route Survey, Design Drawing & DPR Preparation for DHOPABERIA Water Supply Scheme in Basirhat-II Block under Barasat Division, PHE Dte. ORD/001959/2021-2022 310/BHTSD 07/03/2022 15 SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. 3.60 3.60 1
1492 Barasat Division Acceptance cum work order for Special repair & maintenance of different dia UPVC pipe line at different places in connection with augmentation of Durgapur Baylani w/s Scheme (Z-I), Hingalganj block under Hasnasbad Sub-Division, P.H.E.Dte. ORD/001959/2024-2025 893/BD 20/03/2025 10 ABDUL ALIM MONDAL. 6.06 0.00 100
1493 Barasat Division Route Survey, Design Drawing & DPR Preparation for RAJENDRAPUR Water Supply Scheme in Basirhat-II Block under Barasat Division, PHE Dte. ORD/001960/2021-2022 311/BHTSD 07/03/2022 15 SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. 4.19 0.00 1
1494 Barasat Division Route Survey, Design Drawing & DPR Preparation for DAKSHIN DEBIPUR Water Supply Scheme in Basirhat-II Block under Barasat Division, PHE Dte. ORD/001961/2021-2022 312/BHTSD 07/03/2022 15 SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. 2.87 0.00 1
1495 Barasat Division Route Survey, Design Drawing & DPR Preparation for MATHURAPUR Water Supply Scheme in Basirhat-II Block under Barasat Division, PHE Dte. ORD/001967/2021-2022 341/BHTSD 14/03/2022 15 SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. 3.50 3.50 1
1496 Barasat Division Route Survey, Design Drawing & DPR Preparation for SRINAGAR Water Supply Scheme in Basirhat-II Block under Barasat Division, PHE Dte. ORD/001968/2021-2022 342/BHTSD 14/03/2022 15 SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. 4.10 0.00 1
1497 Barasat Division Route Survey, Design Drawing & DPR Preparation for RAHARHATI Water Supply Scheme in Basirhat-II Block under Barasat Division, PHE Dte. ORD/001969/2021-2022 343/BHTSD 14/03/2022 15 SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. 3.34 2.97 1
1498 Barasat Division Route Survey, Design Drawing & DPR Preparation for CHAMPAPUKURIA Water Supply Scheme in Basirhat-II Block under Barasat Division, PHE Dte. ORD/001970/2021-2022 344/BHTSD 14/03/2022 15 SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. 3.43 3.42 1
1499 Barasat Division Route Survey, Design Drawing & DPR Preparation for RAGHUNATHPUR Water Supply Scheme in Basirhat-II Block under Barasat Division, PHE Dte. ORD/001971/2021-2022 345/BHTSD 14/03/2022 15 SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. 3.11 3.10 1
1500 Barasat Division Route Survey, Design Drawing & DPR Preparation for DHANYAKURIA Water Supply Scheme in Basirhat-II Block under Barasat Division, PHE Dte. ORD/001973/2021-2022 346/BHTSD 14/03/2022 15 SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. 4.79 4.79 1
1501 Barasat Division Additional Route Survey work for DPR Preparation for DHANYAKURIA Water Supply Scheme in Basirhat-II Block under Barasat Division, PHE Dte. ORD/001975/2021-2022 347/BHTSD 14/03/2022 15 SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. 1.25 1.25 1
1502 Barasat Division Route Survey, Design Drawing & DPR Preparation for ATURIA Water Supply Scheme in Baduria Block under Barasat Division, PHE Dte. ORD/001976/2021-2022 348/BHTSD 14/03/2022 15 SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. 4.97 4.97 1
1503 Barasat Division Additional Survey work for DPR Preparation for ATURIA Water Supply Scheme in Baduria Block under Barasat Division, PHE Dte. ORD/001977/2021-2022 349/BHTSD 14/03/2022 15 SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. 1.98 1.91 1
1504 Barasat Division Route Survey, Design Drawing & DPR Preparation for MAGURALI Water Supply Scheme in Baduria Block under Barasat Division, PHE Dte. ORD/001978/2021-2022 350/BHTSD 14/03/2022 15 SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. 4.96 4.96 1
1505 Barasat Division Route Survey, Design Drawing & DPR Preparation for DAKSHIN CHATRA ZONE -1 Water Supply Scheme in Baduria Block under Barasat Division, PHE Dte. ORD/001979/2021-2022 351/BHTSD 14/03/2022 15 SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. 4.95 4.95 1
1506 Barasat Division Additional Survey work for DPR Preparation for DAKSHIN CHATRA ZONE -1 Water Supply Scheme in Baduria Block under Barasat Division, PHE Dte. ORD/001980/2021-2022 352/BHTSD 14/03/2022 15 SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. 1.38 1.36 1
1507 Barasat Division Acceptance cum work order for Sinking of 2 nos. 300 mm. x 200 mm. dia. 360 mtr deep Tubewell by D.R. Rig method at PH No.-1 & 2 with PVC pipe & strainer having 300mm dia 48 mtr. long housing pipe & 200mm dia 30 mtr. long filter for Augmentation of Sultanpur w/s scheme, Minakhan block under Hasnabad Sub-Division, P.H.E. Dte. ORD/001980/2023-2024 917/BD 15/03/2024 45 M/S B.K.ENTERPRISE. 50.73 45.65 100
1508 Barasat Division Route Survey, Design Drawing & DPR Preparation for BAJITPUR ZONE 1 Water Supply Scheme in Baduria Block under Barasat Division, PHE Dte. ORD/001981/2021-2022 353/BHTSD 14/03/2022 15 SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. 4.97 4.97 1
1509 Barasat Division Additional Survey work for DPR Preparation for BAJITPUR ZONE -1 Water Supply Scheme in Baduria Block under Barasat Division, PHE Dte. ORD/001982/2021-2022 354/BHTSD 14/03/2022 15 SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. 0.63 0.61 1
1510 Barasat Division Route Survey, Design Drawing & DPR Preparation for BAJITPUR ZONE -2 Water Supply Scheme in Baduria Block under Barasat Division, PHE Dte. ORD/001983/2021-2022 355/BHTSD 14/03/2022 15 SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. 3.74 3.72 1
1511 Barasat Division Acceptance cum work order for Sinking of 3 nos. 300 mm. x 200 mm. dia. 360 mtr deep Tubewell by D.R. Rig method at PH No.-1, 2 & 3 with PVC pipe & strainer having 300mm dia 48 mtr. long housing pipe & 200mm dia 30 mtr. long filter within Bhanderkhali w/s scheme, Hingalganj block under Hasnabad Sub-Division, P.H.E. Dte. ORD/001983/2023-2024 918/BD 15/03/2024 60 SAHA CONSTRUCTION & CO 77.65 0.00 0
1512 Barasat Division Route Survey, Design Drawing & DPR Preparation for RAJAPUR Water Supply Scheme in Baduria Block under Barasat Division, PHE Dte. ORD/001984/2021-2022 356/BHTSD 14/03/2022 15 SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. 4.16 4.13 0
1513 Barasat Division Route Survey, Design Drawing & DPR Preparation for CHANDIPUR Water Supply Scheme in Baduria Block under Barasat Division, PHE Dte. ORD/001985/2021-2022 357/BHTSD 14/03/2022 15 SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. 4.95 4.95 100
1514 Barasat Division Additional Survey work for DPR Preparation for CHANDIPUR Water Supply Scheme in Baduria Block under Barasat Division, PHE Dte. ORD/001986/2021-2022 358/BHTSD 14/03/2022 15 SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. 0.31 0.28 100
1515 Barasat Division Route Survey, Design Drawing & DPR Preparation for ARSULA Water Supply Scheme in Baduria Block under Barasat Division, PHE Dte. ORD/001987/2021-2022 359/BHTSD 14/03/2022 15 SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. 3.34 3.34 1
1516 Barasat Division Route Survey, Design Drawing & DPR Preparation for GOKNA Water Supply Scheme in Baduria Block under Barasat Division, PHE Dte. ORD/001988/2021-2022 360/BHTSD 14/03/2022 15 SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. 4.96 4.96 1
1517 Barasat Division Acceptance cum work order for Supply of sluice valve i/c Construction of Sluice valve chamber and other allied works at different location within Rupmari w/s scheme (For Zone-IV to VI), Hingalganj block under Hasnabad Sub- Division P.H.E. Dte. ORD/001989/2021-2022 253/HSD 07/02/2022 10 M/S DATTA ENTERPRISE. 4.86 3.46 1
1518 Barasat Division Acceptance cum work order for Supply of sluice valve i/c Construction of Sluice valve chamber and other allied works at different location within Rupmari w/s scheme (For Zone-I to III), Hingalganj block under Hasnabad Sub- Division P.H.E. Dte. ORD/001990/2021-2022 256/HSD 07/02/2022 10 M/S PROGATI ENTERPRISE. 3.46 3.46 1
1519 Barasat Division Additional Survey work for DPR Preparation for GOKNA Water Supply Scheme in Baduria Block under Barasat Division, PHE Dte. ORD/001991/2021-2022 361/BHTSD 14/03/2022 15 SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. 4.59 4.53 1
1520 Barasat Division Acceptance cum work order for Additional Land development at Head Work Site within Hingalganj w/s scheme (Z-I), Hingalganj block under Hasnabad Sub-Division P.H.E. Dte. ORD/001992/2021-2022 1664/HSD 05/10/2021 10 MONDAL & CO. (BASIRHAT). 4.85 4.84 1
1521 Barasat Division Route Survey, Design Drawing & DPR Preparation for KULIA Water Supply Scheme in Baduria Block under Barasat Division, PHE Dte. ORD/001993/2021-2022 374/BHTSD 16/03/2022 15 SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. 2.77 2.77 1
1522 Barasat Division Route Survey, Design Drawing & DPR Preparation for MASIA-NABASTIA Water Supply Scheme in Baduria Block under Barasat Division, PHE Dte. ORD/001994/2021-2022 375/BHTSD 16/03/2022 15 SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. 3.22 3.19 1
1523 Barasat Division Route Survey, Design Drawing & DPR Preparation for SIMLA DURGAPUR Water Supply Scheme in Baduria Block under Barasat Division, PHE Dte. ORD/001995/2021-2022 376/BHTSD 16/03/2022 15 SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. 4.96 4.96 1
1524 Barasat Division Additional survey work for DPR Preparation for SIMLA DURGAPUR Water Supply Scheme in Baduria Block under Barasat Division, PHE Dte. ORD/001996/2021-2022 377/BHTSD 16/03/2022 15 SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. 1.66 0.00 1
1525 Barasat Division Formal work order for Dismantling and Cement Concreting of existing Cement Concrete Road for laying rest part of UPVC pipes within command area and Drum Sheet Walling for supporting other UPVC Pipes along the NH 35 for Augmentation work at Chandpara W/S Scheme under Gaighata block within the jurisdiction of Bongaon Sub-Division under Barasat Division, P.H.E. Dte. ORD/002017/2023-2024 808/BD 12/03/2024 630 MAHAVIR PUMPS MANUFACTURING PVT.LTD. 112.22 22.51 60
1526 Barasat Division Acceptance cum work order for Repair & Renovation work at Different site in connection with Augmentation of Sohai Swetpur, Zone-I Water Supply Scheme under Barasat Sub Division, P.H.E.Dte. ORD/002017/2024-2025 1026/BD 28/03/2025 45 M/S S.HAQUE & CO. 12.75 0.00 100
1527 Barasat Division Formal Work order for Providing Functional Household Tap Connection (FHTC) to the uncovered household and laying of UPVC Dedicated Main Pipe Line towards different mouza for better supply of drinking water along with pipe protection and Road Restoration work under Augmentation work at Krishnachandrapur W/S Scheme at Bongaon Block within the jurisdiction of Bongaon Sub-Division under Barasat Division, P.H.E. Dte. ORD/002022/2023-2024 887/BD 14/03/2024 621 SAHA CONSTRUCTION & CO 108.90 84.75 90
1528 Barasat Division Route Survey, Design Drawing & DPR Preparation for Deora W/S Scheme in Swarupnagar Block under Barasat Division, P.H.E. Dte. ORD/002023/2021-2022 126/HAB 16/03/2022 10 SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. 3.23 3.19 1
1529 Barasat Division Acceptance cum work order for Renovation of Arsenic cum Iron Removal Plant at Taranipur zone - II W/S Scheme including increasing the height of back wash water tank at Swarupnagar Block under Basirhat Sub Division, PHE Dte. Capacity- 50.00 Cum/hr. ORD/002023/2023-2024 894/BD 15/03/2024 60 M/S R.K. ENTERPRISE 18.02 0.00 0
1530 Barasat Division Route Survey, Design Drawing & DPR Preparation for Ashudi W/S Scheme in Habra - II Block under Barasat Division, P.H.E. Dte. ORD/002024/2021-2022 127/HAB 16/03/2022 10 SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. 3.13 3.09 1
1531 Barasat Division Route Survey, Design Drawing & DPR Preparation for Matiagacha W/S Scheme in Habra - II Block under Barasat Division, P.H.E. Dte. ORD/002025/2021-2022 128/HAB 16/03/2022 10 SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. 3.35 0.00 1
1532 Barasat Division Acceptance cum work order for Renovation of Arsenic cum Iron Removal Plant at Sadiknagar zone - II W/S Scheme at Basirhat - II Block under Basirhat Sub Division, PHE Dte. Capacity - 56.25 Cum/hr. ORD/002025/2023-2024 919/BD 15/03/2024 60 MONDAL PRECISION PVT.LTD 29.40 29.39 100
1533 Barasat Division Acceptance cum work order for Renovation of Arsenic cum Iron Removal Plant at Nalkora W/S Scheme including increasing the height of back wash tank at Basirhat - I Block under Basirhat Sub Division, PHE Dte. Capacity - 10.81 Cum/hr. ORD/002026/2023-2024 920/BD 15/03/2024 240 MONDAL PRECISION PVT.LTD 23.26 16.77 60
1534 Barasat Division Acceptance cum work order for Renovation of Arsenic cum Iron Removal Plant at Bithari zone - I W/S Scheme including increasing the height of back wash water tank at Swarupnagar Block under Basirhat Sub Division, PHE Dte. Capacity- 153.00 Cum/hr. ORD/002028/2023-2024 927/BD 15/03/2024 600 RITE WATER SOLUTIONS (I) PVT.LTD. 19.57 0.00 90
1535 Barasat Division Acceptance cum work order for Renovation of Arsenic cum Iron Removal Plant at Goknasree Gobindapur W/S Scheme including increasing the height of back wash tank at Basirhat - I Block under Basirhat Sub Division, PHE Dte. Capacity- 60.00 Cum/hr. ORD/002029/2023-2024 923/BD 15/03/2024 60 EFFLUENT & WATERTREATMENT ENGINEERS (P) LTD. 33.01 27.58 50
1536 Barasat Division Acceptance cum work order for Sinking of 2 nos. 300 mm. x 200 mm. dia. 360 mtr deep Tubewell by D.R. Rig method at PH No.-1 & 2 with PVC pipe & strainer having 300mm dia 48 mtr. long housing pipe & 200mm dia 30 mtr. long filter for Augmentation of Bhabanipur w/s scheme (Z-I), Hasnabad block under Hasnabad Sub-Division, P.H.E. Dte. ORD/002031/2023-2024 931/BD 15/03/2024 45 AAHAN CONSTRUCTION 59.17 0.00 0
1537 Barasat Division Hiring 1(One) No. Diesel Luxury Car on Daily basis for the office use of the Assistant Engineer, Barasat Sub Division, P.H.E. Dte. (For the Period from 08/03/2024 to 31/08/2024) ORD/002032/2023-2024 1215/BSD 07/03/2024 176 ANJALI ENTERPRISE. 0.84 1.45 0
1538 Barasat Division Route Survey, Design Drawing & DPR Preparation for Sindrani (Zone-I) Water Supply Scheme under Bongaon Sub-Division, under Barasat Division, PHE Dte. ORD/002033/2021-2022 609/Bon 31/12/2021 20 UMWELT ENGINEER PVT.LTD. 4.14 4.14 1
1539 Barasat Division Acceptance cum work order for Renovation of Arsenic cum Iron Removal Plant at Sonepur W/S Scheme including increasing the height of back wash water tank at Swarupnagara Block under Basirhat Sub Division, PHE Dte. Capacity-10.00Cum/hr. ORD/002033/2023-2024 924/BD 15/03/2024 360 EFFLUENT & WATERTREATMENT ENGINEERS (P) LTD. 23.32 0.00 75
1540 Barasat Division Formal work order for Providing Functional Household Tap Connection(FHTC) from existing and new proposed distribution system within the command area of Kapileswarpur Water Supply Scheme at Swarupnagar Block under Barasat Division, PHE Dte. (Phase - I) ORD/002034/2021-2022 940/BD 28/03/2022 90 SRI KRISHNA CO-OP-LABOUR CONTRACT AND CONST SOC LTD. 164.90 108.96 1
1541 Barasat Division Acceptance cum work order for Renovation of Arsenic cum Iron Removal Plant at Parui W/S Scheme including increasing the height of back wash tank at Swarupnagar Block under Basirhat Sub Division, PHE Dte. capacity - 160.00 cum/hr. ORD/002034/2023-2024 925/BD 15/03/2024 360 EFFLUENT & WATERTREATMENT ENGINEERS (P) LTD. 37.26 0.00 50
1542 Barasat Division Acceptance cum work order for Route Survey, Design Drawing & DPR Preparation for Khulna Bhandarkhali Zone-I Water Supply Scheme under Barasat Division, PHE Dte. ORD/002035/2021-2022 2177/HSD 28/12/2021 21 SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. 3.92 3.93 1
1543 Barasat Division Acceptance cum work order for Route Survey, Design Drawing & DPR Preparation for Dakshin Bhebia Zone-I Water Supply Scheme under Barasat Division, PHE Dte. ORD/002036/2021-2022 2183/HSD 28/12/2021 21 SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. 4.49 4.49 1
1544 Barasat Division Acceptance cum work order for Renovation of Iron Elimination Plant at Shankarpur W/S Scheme at Basirhat- I Block under Basirhat Sub division, PHE Dte. Capacity- 93.0625 m3/hr. ORD/002036/2023-2024 922/BD 15/03/2024 60 NEER UDYOG 16.57 16.34 80
1545 Barasat Division Acceptance cum work order for Route Survey, Design Drawing & DPR Preparation for Kumarjole Water Supply Scheme under Barasat Division, PHE Dte. ORD/002037/2021-2022 2171/HSD 28/12/2021 21 UMWELT ENGINEER PVT.LTD. 4.24 0.00 1
1546 Barasat Division Formal work order for Providing Functional Household Tap Connection (FHTC) from existing and new proposed distribution system within command area of Kurulia(Zone-II) Water Supply Scheme under Bongaon Sub-Division, PHE Dte. (Augmentation). ORD/002038/2021-2022 988/BD 31/03/2022 90 H.I.ENTERPRISE. 360.51 360.44 1
1547 Barasat Division Continuation Work Order for Hiring of 1(one) number vehicle of Category Motor Cab/Maruti Omni(standard)(Non Air-Conditioned)/LPG/CNG Engine including Driver for performing the inspection works and official duties for the office of the Assistant Engineer, Barrackpore Sub- Division, P.H.E. Dte. at Barrackpore, Kolkata-700122, District- North 24Pgns, W.B. ORD/002038/2023-2024 107/BKP 06/03/2024 184 GOPAL SINGHA. 0.87 2.05 100
1548 Barasat Division Formal work order for Additional Laying of DI/UPVC distribution pipe line and Providing Functional Household Tap Connection for the leftout portion in connection with Augmentation of Chaital water supply scheme, Minakhan Block under Hasnabad Sub-Division, PHE Dte. ORD/002054/2023-2024 881/BD 14/03/2024 90 M/S B.K.ENTERPRISE. 140.08 63.01 80
1549 Barasat Division Acceptance cum work order for Providing Functional Household Tap Connection (FHTC) in connection with Jal Jeevan Mission (JJM and JAL SWAPNA) under command area of BAGDAH Water Supply Scheme at Bagdah Block under Barasat Division, PHE Dte. (Phase-I) ORD/002056/2021-2022 990/BD. 27/05/2021 45 UMWELT ENGINEER PVT.LTD. 89.35 18.85 1
1550 Barasat Division Acceptance cum work order for Hiring Diesel Luxury Car on Daily basis for the office use of Deputy Superintending Engineer, Planning Circle-I, PHE Dte.(01-04-2024 to 30-06-2024). ORD/002056/2023-2024 926/BD 15/03/2024 91 M/S B.K.ENTERPRISE. 0.43 1.02 100
1551 Barasat Division Acceptance cum work order for Repair & Renovation work at Head work site in connection with Augmentation of Humaipur Water Supply Scheme under Barasat Sub Division, P.H.E.Dte. ORD/002061/2024-2025 1033/BD 28/03/2025 45 MUKHERJEE CONSTRUCTION (NADIA) 19.71 0.00 0
1552 Barasat Division Acceptance cum work order for Protection of different dia. UPVC pipe line by UC Bullah pile at different places in Paschim Sandelerbill Uttarpara within Hingalganj W/S/Scheme(Z-II). Hingalganj Block under Hasnabad Sub -Division P.H.E. Dte. ORD/002069/2021-2022 1470/BD. 13/08/2021 15 M/S B.K.ENTERPRISE. 15.23 2.57 1
1553 Barasat Division Acceptance cum work order for Additional Survey Work For DPR Preparation of Kaniakati Kathalberia Zone I/A & Zone I/B Water Supply Scheme under Barasat Division, PHE Dte. ORD/002089/2021-2022 2145/HSD 28/12/2021 21 SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. 1.99 1.96 1
1554 Barasat Division Acceptance cum work order Route Survey, Design Drawing & DPR Preparation for Kaniakati Kathalberia Zone I/A & Zone I/B Water Supply Scheme under Barasat Division, PHE Dte. ORD/002090/2021-2022 2144/HSD 28/12/2021 21 SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. 4.76 4.76 1
1555 Barasat Division Acceptance cum work order for Route Survey, Design Drawing & DPR Preparation for Kaniakati Kathalberia Zone II/A & Zone II/B Water Supply Scheme under Barasat Division, PHE Dte. ORD/002091/2021-2022 2142/HSD 28/12/2021 21 SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. 4.76 4.73 1
1556 Barasat Division Acceptance cum work order Additional Survey Work For DPR Preparation of Kaniakati Kathalberia Zone II/A & Zone II/B Water Supply Scheme under Barasat Division, PHE Dte. ORD/002092/2021-2022 2143/HSD 28/12/2021 21 SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. 2.21 2.19 1
1557 Barasat Division Acceptance cum work order for Protection works for newly laid different dia. UPVC/DI pipe line at different places in Sandelerbill mouza within Hingalganj W/S/Scheme(Z-II). Hingalganj Block under Hasnabad Sub -Division P.H.E. Dte ORD/002093/2021-2022 1463/BD. 13/08/2021 15 M/S PROGATI ENTERPRISE. 15.81 2.48 1
1558 Barasat Division Hiring additional Diesel Luxury Car on daily basis for the office use of the Assistant Engineer, Basirhat Sub-Division P.H.E. Dte. (Period: 01.07.2023 to 31.12.2023) ORD/002104/2023-2024 605/BHTSD 28/06/2023 184 OM ENTERPRISE 0.87 1.91 0
1559 Barasat Division Acceptance cum work order for Construction of Anchor block for resting of different dia DI Rising/Distribution main for low areas at different places for Rejuvenation of Baunia Abad w/s scheme, Sandeshkhali-I Block under Hasnabad Sub-Division P.H.E. Dte. (Part-A) ORD/002119/2021-2022 415/HSD 04/03/2022 15 M/S PROGATI ENTERPRISE. 4.71 4.71 1
1560 Barasat Division Acceptance cum work order for Protection works for newly laid different dia.UPVC/DI pipe line at different places in Radhanagar laskar para, majher para, Singh para & Tati Para within Chhoto Sehara W/S/Scheme, Sandeshkhali-I Block under Hasnabad Sub-Division P.H.E.Dte. ORD/002120/2021-2022 1467/BD. 13/08/2021 30 M/S DATTA ENTERPRISE. 31.60 4.63 1
1561 Barasat Division Acceptance cum work order for Protection works for newly laid different dia.UPVC/DI pipe line at different places in Bermajur Taltala Para, Molla para, Hatkhola Para, Dangal para, Kalyani para, Kachari para & Pol para within Bermajur W/S/Scheme Sandeshkhali-II Block under Hasnabad Sub-Division P.H.E.Dte. ORD/002121/2021-2022 1465/BD. 13/08/2021 30 UNIFIED ENGINEERS' CO-OPERATIVE SOCIETYLTD. 32.29 6.09 1
1562 Barasat Division Acceptance cum work order for Protection works for newly laid different dia.UPVC/DI pipe line at different places in Bankra & Bankra Dobar mouza within Hingalganj W/S/Scheme(Z-II). Hingalganj Block under Hasnabad Sub-Division P.H.E.Dte ORD/002125/2021-2022 1464/BD. 13/08/2021 30 MONDAL & CO. (BASIRHAT). 31.68 5.28 1
1563 Barasat Division Acceptance cum Work Order for Providing Functional Household Tap Connection (FHTC) in Bankra mouza including laying of UPVC/PVC pipe & supply of necessary fittings within Hingalganj Water Supply Scheme (Zone-II), at Hingalganj Block under Hasnabad Sub-Division, PHE Dte. ORD/002126/2021-2022 1295/BD. 26/07/2021 60 MONDAL PRECISION PVT.LTD 115.98 100.18 1
1564 Barasat Division Construction of New Pump House (Charkhara Mouza) with latrine at Chandrapur Water Supply Scheme under Barasat-I Block, size of 3.00m x 3.60m with latrine within Barasat Sub Division, P.H.E.Dte. ORD/002150/2023-2024 1241/BSD 15/03/2024 31 S.MUKHERJEE. 4.18 0.00 0
1565 Barasat Division Construction of Pump House with latrine at Berachampa Zone-I water Supply Scheme under Deganga Block size of 5.40m x 3.60m within Barasat Sub Division, P.H.E.Dte. ORD/002151/2023-2024 1242/BSD 15/03/2024 31 ROMI TREDERS. 4.86 4.86 100
1566 Barasat Division Construction of Pump House with latrine at Berachampa Zone-III water Supply Scheme under Deganga Block size of 5.40m x 3.60m within Barasat Sub Division, P.H.E.Dte. ORD/002152/2023-2024 1243/BSD 15/03/2024 277 D.K.CONSTRUCTION 4.91 4.90 80
1567 Barasat Division Construction of Pump House with latrine at Berachampa Zone-IV water Supply Scheme under Deganga Block size of 5.40m x 3.60m within Barasat Sub Division, P.H.E.Dte. ORD/002153/2023-2024 1244/BSD 15/03/2024 31 M/S S.HAQUE & CO. 4.88 4.87 100
1568 Barasat Division Construction of Pump House with latrine at Berachampa Zone-V water Supply Scheme under Deganga Block size of 5.40m x 3.60m within Barasat Sub Division, P.H.E.Dte. ORD/002154/2023-2024 1245/BSD 15/03/2024 31 SANTU GHOSH. 4.91 4.90 90
1569 Barasat Division Acceptance cum work order for Construction of 5.40 mtr. X 3.60mtr. size Switch room with sanitary and water supply arrangement incl. plinth protection at Head Work site at Garibpur w/s scheme Bongaon Block within the jurisdiction of Bongaon Sub-Division, under Barasat Division, P.H.E. Dte. ORD/002173/2023-2024 607/BD 23/02/2024 307 TAPAN GHOSH. 5.61 1.49 100
1570 Barasat Division Continuation Work Order for Hiring of 1(one) number vehicle of Category Motor Cab/Maruti Omni(standard)(Non Air-Conditioned)/LPG/CNG Engine including Driver for performing the inspection works and official duties for the office of the Assistant Engineer, Barrackpore Sub-Division, P.H.E. Dte. at Barrackpore, Kolkata-700122, District- North 24Pgns, W.B.(period from 01.02.2025 to 31.07.2025) ORD/002178/2024-2025 21/BKP 30/01/2025 181 GOPAL SINGHA. 0.86 1.37 0
1571 Barasat Division Continuation Work for Hiring Diesel Luxury Car on daily basis for the office use of the Assistant Engineer, Basirhat Sub-Division P.H.E. Dte. (Period: 01.01.2024 to 30.06.2024 for Six Month) ORD/002197/2023-2024 1290/BHTSD 29/12/2023 182 DEB KUMAR DAS. 0.86 1.51 100
1572 Barasat Division Acceptance cum work order for Construction of 5.40 mtr. X 3.60mtr. size Switch room with sanitary and water supply arrangement incl. plinth protection at Head Work site at Gadpukuria w/s scheme (Zone-II), Bagdah Block within the jurisdiction of Bongaon Sub-Division, under Barasat Division, P.H.E. Dte. ORD/002212/2023-2024 608/BD 23/02/2024 45 UPWARDS ENGINEERING PRIVATE LIMITED. 5.57 5.57 100
1573 Barasat Division Acceptance cum work order for Providing Functional Household Tap Connection (FHTC) in Bankra Dobar mouza including laying of UPVC/PVC pipe & supply of necessary fittings within Hingalganj w/s scheme (Zone-II), Hingalganj block under Hasnabad Sub-Division, PHE Dte. ORD/002215/2020-2021 491/BD. 26/02/2021 30 J.D.J.ENTERPRISE. (TRADERS PVT.LTD) 3.45 3.45 1
1574 Barasat Division - Hiring of Luxury Car (Diesel) for the office use of the Assistant Engineer Bongaon Sub-Division, P.H.E. Dte. Under Bongaon Sub-Division P.H.E. Dte. (Period from 01.02.2021 to 31.01.2022.) ORD/002217/2020-2021 77/Bon 29/01/2021 365 ROY ENGINEERS. 1.73 0.00 1
1575 Barasat Division Hiring 1 (one) no. Diesel Luxary Car on daily basis for office use of the Assistant Engineer, R.W.S, Barasat Sub- Division, P.H.E. Dte. [For 6(Six) months].i.e 01.03.2025 to 31.08.2025 ORD/002234/2024-2025 222/BST 28/02/2025 184 DEBAPRASAD MONDAL. 0.87 0.25 0
1576 Barasat Division Acceptance cum work order for Hiring diesel luxury car daily basis (From 01.06.2024 to 30.11.2024) for the Office uses of the Assistant Engineer (HQ) Barasat Division, P.H.Dte. ORD/002257/2023-2024 845/BD 13/03/2024 183 KRISHNA SAHA. 0.87 0.76 0
1577 Barasat Division Acceptance cum work order for Construction of boundary wall with column structure at PH No-- 2, 3 & 4 within Katakhali w/s scheme, Hasnabad Block under Hasnabad Sub-Division, PHE Dte. ORD/002258/2024-2025 1028/BD 28/03/2025 90 R B ENTERPRISE 25.44 0.00 0
1578 Barasat Division Acceptance cum work order for Construction of boundary wall with column structure at OHR site, PH No-2 & 3 in connection with augmentation of Padmapukuria w/s scheme (Z-I), Minakhan Block under Hasnabad Sub-Division, PHE Dte. ORD/002261/2024-2025 1030/BD 28/03/2025 90 JESMINE ENTERPRISE. 28.96 0.00 0
1579 Barasat Division Acceptance cum work order for Construction of boundary wall with column structure at OHR site in connection with augmentation of Padmapukuria w/s scheme (Z-II), Minakhan Block under Hasnabad Sub-Division, PHE Dte. ORD/002262/2024-2025 1029/BD 28/03/2025 90 M/S B.K.ENTERPRISE. 18.14 0.00 0
1580 Barasat Division Acceptance cum work order for Construction of boundary wall with column structure at Head Work site within Tapla Kusangra w/s scheme, Minakhan Block under Hasnabad Sub-Division, PHE Dte. ORD/002263/2024-2025 1031/BD 28/03/2025 90 ACHARJEE AND ASSOCIATES 17.53 0.00 0
1581 Barasat Division Acceptance cum work order for Construction of boundary wall with column structure at Head Work site (PH No-1) & PH No- 2 within Jhikra w/s scheme, Minakhan Block under Hasnabad Sub-Division, PHE Dte. ORD/002264/2024-2025 1027/BD 28/03/2025 90 M/S NIRMAN CONSTRUCTION. 31.11 0.00 0
1582 Barasat Division Construction of 3.60 mtr. X 3.00mtr. size Switch room with sanitary and water supply arrangement incl. plinth protection at 2nd Tube Well site at Gadpukuria w/s scheme (Zone-II), Bagdah block within the jurisdiction of Bongaon Sub-Division, under Barasat Division, P.H.E. Dte. ORD/002273/2023-2024 210/Bon 27/02/2024 45 ONKAR ENTERPRISE. 4.35 4.35 100
1583 Barasat Division Construction of 3.60 mtr. X 3.00mtr. size Switch room with sanitary and water supply arrangement incl. plinth protection at 2nd Tube Well site at Kamlabas w/s scheme Bagdah block within the jurisdiction of Bongaon Sub-Division, under Barasat Division, P.H.E. Dte. ORD/002274/2023-2024 211/Bon 27/02/2024 45 MONDAL & CO.(BON) 4.39 4.39 100
1584 Barasat Division Renovation and repairing of Boundary wall and Construction of Approach Road at 2nd Tube Well site under Augmentation of Chandpara Water Supply Scheme, Gaighata Block within the jurisdiction of Bongaon Sub-Division under Barasat Division, P.H.E. Dte. ORD/002275/2023-2024 841/Bon 01/11/2023 23 M/S SAYAN ENTERPRISE. 4.59 0.00 0
1585 Barasat Division Acceptance cum work order for Providing Functional Household Tap Connection (FHTC) in connection with Jal Jeevan Mission (JJM and JAL SWAPNA) under command area of KURULIA (Zone-II) Water Supply Scheme at Bagdah Block under Barasat Division, PHE Dte. (Phase-I) ORD/002293/2020-2021 490/BD. 26/02/2021 45 ORIENT CONSTRUCTION. 67.42 0.00 1
1586 Barasat Division Providing Functional Household Tap Connection (FHTC) in connection with Jal Jeevan Mission (JJM and Jal Swapna) under command area of Malidah Water Supply Scheme at Bagdah Block under Barasat Division, PHE Dte. (Phase-I). ORD/002294/2020-2021 79/BD. 18/01/2021 60 ORIENT CONSTRUCTION. 57.85 0.00 0
1587 Barasat Division providing of Functional House hold Tap connection (FHTC) in connection with JJM under command area of Malidah Water Supply Scheme. ORD/002299/2020-2021 276/BD. 05/02/2021 7 ORIENT CONSTRUCTION. 11.00 11.00 1
1588 Barasat Division Construction of 3.60 mtr. X 3.00mtr. size Switch room with sanitary and water supply arrangement incl. plinth protection at 2nd Tube Well site at Sindrani w/s scheme (Zone-II), Bagdah block within the jurisdiction of Bongaon Sub-Division, under Barasat Division, P.H.E. Dte. ORD/002299/2023-2024 209/Bon 27/02/2024 45 SAMBHU RAY CHOWDHURY. 4.41 4.40 100
1589 Barasat Division Acceptance cum work order for Construction of protection wall for protection of UPVC pipe line at N/H of Majed Gazi at Uttar Kumarjole Purba para for Retrofitting of Kumarjole W/S Scheme, Minakhan Block under Hasnabad Sub-Division P.H.E. Dte. ORD/002303/2020-2021 2055/BD 18/09/2020 10 RUDRA DAS. 3.27 3.27 0
1590 Barasat Division Acceptance cum work order for Dismantling & Re-construction of boundary wall for movement of rig & other machineries for sinking of big dia TW at PH no-3 in connection with Augmentation of Khulna Bhandarkhali w/s scheme (Z-I), Sandeshkhali -II block under Hasnabad Sub-Division P.H.E. Dte. ORD/002346/2023-2024 800/HSD 24/05/2023 10 JESMINE ENTERPRISE. 0.84 0.80 100
1591 Barasat Division Renovation and repairing of Boundary wall and Construction of Approach Road at 2nd Tube Well site under Augmentation of Chikanpara Water Supply Scheme, Gaighata Block within the jurisdiction of Bongaon Sub-Division under Barasat Division, P.H.E. Dte. ORD/002349/2023-2024 977/Bon 27/12/2023 30 M/S SAYAN ENTERPRISE. 4.84 0.00 0
1592 Barasat Division Renovation and repairing of Boundary wall and Construction of Approach Road at 2nd Tube Well site under Augmentation of Ichhapur Water Supply Scheme, Gaighata Block within the jurisdiction of Bongaon Sub-Division under Barasat Division, P.H.E. Dte. ORD/002350/2023-2024 978/Bon 27/12/2023 30 SAMBHU RAY CHOWDHURY. 3.63 0.00 0
1593 Barasat Division Continuation Work for Hiring additional Diesel Luxury Car on daily basis for the office use of the Assistant Engineer, Basirhat Sub-Division P.H.E. Dte. (Period: 01.01.2024 to 30.06.2024) ORD/002419/2023-2024 1291/BHTSD 29/12/2023 183 OM ENTERPRISE 0.86 1.71 0
1594 Barasat Division Acceptance cum work order for Dismantling & Re-construction of boundary wall for movement of rig & other allied machineries for sinking of big dia TW at PH no- 2 in connection with Augmentation of Gabberia w/s scheme, Sandeshkhali-II block under Hasnabad Sub-Division P.H.E. Dte. ORD/002429/2023-2024 33/HSD 09/01/2024 10 M/S RAJPATH CONSTRUCTION. 0.92 0.00 100
1595 Barasat Division Work order for Supply of one motor launch on daily hire basis for use of Hasnabad Sub-Division, P.H.E. Dte. Period : 01.11.23 to 31.03.24 = 152 days. ORD/002444/2023-2024 1362/HSD 31/10/2023 152 SUSMITA MANDAL. 2.26 7.48 10
1596 Barasat Division Continuation order for one motor launch (M.V. JOYMAKALI) on daily hire basis for use of Hasnabad Sub-Division, P.H.E. Dte. Period : 01.09.23 to 31.10.23 = 61 days. ORD/002445/2023-2024 1030/HSD 29/08/2023 61 SUSMITA MANDAL. 0.91 2.66 5
1597 Barasat Division Work order for Supply of Mechanized boat on hire basis with providing driver, helper and other requirement as per terms condition and specification as per direction of the EIC under Hasnabad Sub-Division, P.H.E. Dte. Period : 01.11.23 to 30.04.24 ORD/002446/2023-2024 1396/HSD 31/10/2023 182 RANJIT KUMAR MANDAL 1.61 5.42 5
1598 Barasat Division Acceptance cum work order for Dismantling & Re-construction of boundary wall for movement of rig & other allied machineries for sinking of big dia TW at PH no- 1 in connection with Augmentation of Gabberia w/s scheme, Sandeshkhali-II block under Hasnabad Sub-Division P.H.E. Dte. ORD/002449/2023-2024 34/HSD 09/01/2024 10 M/S RAJPATH CONSTRUCTION. 0.92 0.00 100
1599 Barasat Division Acceptance cum work order for Hiring Petrol Luxury Car on Daily basis for the office use of the Assistant Engineer(HQ), Barasat Division, PHE Dte. Period from 01.03.2025 to 31.08.2025. ORD/002467/2024-2025 643/BD 28/02/2025 184 M/S B.K.ENTERPRISE. 0.87 0.75 0
1600 Barasat Division Hiring of 1 no. of Diesel Luxury Car (Euro -IV/VI) in good condition (traffic worthy) on daily basis for office use of the Assistant Engineer, for supervision of J.J.M. related work, executed within the entire jurisdiction of Habra Sub-Division, under Barasat Division P.H.E. Dte. (For the period from :01.03.25 to 28.02.26) ORD/002468/2024-2025 204/HAB 27/02/2025 365 M/S SUKANTA ENTERPRISE. 1.73 0.00 0
1601 Barasat Division Acceptance cum work order for 1 no. pump connection at PH No.-1 in connection with Augmentation of Gabberia water supply scheme, Sandeshkhali-II block under Hasnabad Sub-Division, P.H.E. Dte. ORD/002482/2023-2024 36/HSD 09/01/2024 10 ABDUL ALIM MONDAL. 0.79 0.00 100
1602 Barasat Division Additional Survey work for DPR Preparation for PARUI Water Supply Scheme in Swarupnagar Block under Barasat Division, PHE ORD/002494/2021-2022 461 / BHTSD 22/03/2022 15 SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. 2.04 2.04 1
1603 Barasat Division Route Survey,design drawing & DPR Preparation for PARUI Water Supply Scheme in Swarupnagar Block under Barasat Division, PHE Dte. ORD/002495/2021-2022 460 / BHTSD 22/03/2022 15 SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. 4.84 0.00 1
1604 Barasat Division Route Survey, Design Drawing & DPR Preparation for NABATKATI Water Supply Scheme in Swarupnagar Block under Barasat Division, PHE Dte. ORD/002496/2021-2022 459 / BHTSD 22/03/2022 15 SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. 3.81 0.00 1
1605 Barasat Division Route Survey, Design Drawing & DPR Preparation for SONPUR Water Supply Scheme in Swarupnagar Block under Barasat Division, PHE Dte. ORD/002497/2021-2022 458 / BHTSD 22/03/2022 15 SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. 2.87 2.87 1
1606 Barasat Division Additional Survey work for DPR Preparation for BANGLANI Water Supply Scheme in Swarupnagar Block under Barasat Division, PHE Dte. ORD/002498/2021-2022 457 / BHTSD 22/03/2022 15 SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. 1.07 1.07 100
1607 Barasat Division Route Survey, Design Drawing & DPR Preparation for BANGLANI Water Supply Scheme in Swarupnagar Block under Barasat Division, PHE Dte. ORD/002499/2021-2022 456 / BHTSD 22/03/2022 15 SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. 4.95 0.00 1
1608 Barasat Division Acceptance cum work order for Laying of 150 mm dia. DI rising main from PH No-1 to Uttar Kalibari Adhikary House within Mohanpur w/s scheme (Z-II), Minakhan Block under Hasnabad Sub- Division P.H.E. Dte. ORD/002499/2023-2024 803/HSD 13/07/2023 7 SARKAR ENTERPRISE 0.98 0.97 100
1609 Barasat Division Additional Survey work for DPR Preparation for NALABARA Water Supply Scheme in Swarupnagar Block under Barasat Division, PHE Dte. ORD/002501/2021-2022 455 / BHTSD 22/03/2022 15 SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. 3.61 0.00 1
1610 Barasat Division Route Survey, Design Drawing & DPR Preparation for NALABARA Water Supply Scheme in Swarupnagar Block under Barasat Division, PHE Dte. ORD/002502/2021-2022 454 / BHTSD 22/03/2022 15 SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. 4.97 0.00 1
1611 Barasat Division Additional Survey work for DPR Preparation for BITHARI ZONE -2 Water Supply Scheme in Swarupnagar Block under Barasat Division, PHE Dte. ORD/002505/2021-2022 453 / BHTSD 22/03/2022 15 SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. 0.63 0.00 1
1612 Barasat Division Route Survey, Design Drawing & DPR Preparation for BITHARI ZONE -2 Water Supply Scheme in Swarupnagar Block under Barasat Division, PHE Dte. ORD/002506/2021-2022 452 / BHTSD 22/03/2022 15 SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. 4.75 0.00 1
1613 Barasat Division Repairing and renovation of Compressor Room for Iron Elimination Plant under Augmentation of Helencha Water Supply Scheme within the jurisdiction of Bongaon Sub-Division under Barasat Division, P.H.E. Dte. ORD/002506/2023-2024 640/Bon 14/08/2023 21 MONDAL & CO.(BON) 1.59 1.56 100
1614 Barasat Division Additional Survey work for DPR Preparation for BITHARI ZONE -1 Water Supply Scheme in Swarupnagar Block under Barasat Division, PHE Dte. ORD/002507/2021-2022 451 / BHTSD 22/03/2022 15 SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. 1.22 0.00 1
1615 Barasat Division Acceptance cum work order for Hiring of one no. DIESEL MOTOR CAB (BS-VI) on daily hire basis for use of the Assistant Engineer, HASNABAD SUB-DIVISION, PHE DTE. Period from 01.11.23 to 30.04.24 ORD/002507/2023-2024 1315/HSD 30/10/2023 183 RANJIT KUMAR MANDAL 0.86 2.26 0
1616 Barasat Division Route Survey, Design Drawing & DPR Preparation for BITHARI ZONE -1 Water Supply Scheme in Swarupnagar Block under Barasat Division, PHE Dte. ORD/002508/2021-2022 450 / BHTSD 22/03/2022 15 SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. 4.95 0.00 1
1617 Barasat Division Route Survey, Design Drawing & DPR Preparation for DOBILA Water Supply Scheme in Swarupnagar Block under Barasat Division, PHE Dte. ORD/002511/2021-2022 449 / BHTSD 22/03/2022 15 SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. 3.50 0.00 1
1618 Barasat Division Route Survey, Design Drawing & DPR Preparation for GOKULPUR Water Supply Scheme in Swarupnagar Block under Barasat Division, PHE Dte. ORD/002512/2021-2022 448 / BHTSD 22/03/2022 15 SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. 4.32 0.00 1
1619 Barasat Division Route Survey, Design Drawing & DPR Preparation for TARANIPUR ZONE -2 Water Supply Scheme in Swarupnagar Block under Barasat Division, PHE Dte. ORD/002513/2021-2022 447 / BHTSD 22/03/2022 15 SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. 3.40 3.40 1
1620 Barasat Division Route Survey, Design Drawing & DPR Preparation for TARANIPUR ZONE -1 Water Supply Scheme in Swarupnagar Block under Barasat Division, PHE Dte. ORD/002514/2021-2022 446 / BHTSD 22/03/2022 15 SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. 3.69 0.00 1
1621 Barasat Division Route Survey, Design Drawing & DPR Preparation for KAPILESWARPUR Water Supply Scheme in Swarupnagar Block under Barasat Division, PHE Dte. ORD/002515/2021-2022 445 / BHTSD 22/03/2022 15 SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. 4.04 0.00 1
1622 Barasat Division Route Survey, Design Drawing & DPR Preparation for PATUA Water Supply Scheme in Swarupnagar Block under Barasat Division, PHE Dte. ORD/002516/2021-2022 444 / BHTSD 22/03/2022 15 SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. 4.16 0.00 1
1623 Barasat Division Route Survey, Design Drawing & DPR Preparation for GOBINDAPUR Water Supply Scheme in Swarupnagar Block under Barasat Division, PHE Dte. ORD/002517/2021-2022 443 / BHTSD 22/03/2022 15 SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. 4.76 4.76 1
1624 Barasat Division Route Survey, Design Drawing & DPR Preparation for DAKSHIN CHATRA ZONE -2 Water Supply Scheme in Swarupnagar Block under Barasat Division, PHE Dte. ORD/002518/2021-2022 442 / BHTSD 22/03/2022 15 SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. 4.04 0.00 1
1625 Barasat Division Hiring of Luxury Car (Diesel) for the office use of the Assistant Engineer Bongaon Sub-Division, under Barasat Division, P.H.E. Dte. ORD/002518/2023-2024 87/Bon 30/01/2024 182 ROY ENGINEERS. 0.86 1.80 0
1626 Barasat Division Route Survey, Design Drawing & DPR Preparation for BARA BANKRA Water Supply Scheme in Swarupnagar Block under Barasat Division, PHE Dte. ORD/002519/2021-2022 441 / BHTSD 22/03/2022 15 SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. 4.57 0.00 1
1627 Barasat Division Route Survey, Design Drawing & DPR Preparation for NITYANANDAKATI BALTI Water Supply Scheme in Swarupnagar Block under Barasat Division, PHE Dte. ORD/002520/2021-2022 440 / BHTSD 22/03/2022 15 SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. 3.69 0.00 1
1628 Barasat Division Acceptance cum work order for 1 no. pump connection at PH No.-2 in connection with Augmentation of Gabberia water supply scheme, Sandeshkhali-II block under Hasnabad Sub-Division, P.H.E. Dte. ORD/002520/2023-2024 ABDULALIMMONDAL 09/01/2024 10 ABDUL ALIM MONDAL. 0.79 0.00 0
1629 Barasat Division Acceptance cum work order for 1 no. pump connection at PH No.-2 in connection with Augmentation of Gabberia water supply scheme, Sandeshkhali-II block under Hasnabad Sub-Division, P.H.E. Dte. ORD/002521/2023-2024 35/HSD. 09/01/2024 10 ABDUL ALIM MONDAL. 0.79 0.00 100
1630 Barasat Division Hiring of an Additional Vehicle (Diesel) for the site inspection of different ongoing schemes under JJM Program at Bongaon Sub-Division, P.H.E.Dte. ORD/002530/2023-2024 484/Bon 30/06/2023 184 VAI ENTERPRISE. 0.87 1.78 100
1631 Barasat Division Hiring of an Additional Vehicle (Diesel) for the site inspection of different ongoing schemes under JJM Program at Bongaon Sub-Division, P.H.E.Dte. period from 01.01.2024 to 30.06.2024. ORD/002553/2023-2024 1022/Bon 29/12/2023 183 VAI ENTERPRISE. 0.86 1.95 0
1632 Barasat Division Acceptance cum work order for Emergent restoration of existing pilling works to sustain the protection of UPVC distribution pipe line at different places within Bermajur w/s scheme, Sandeshkhali-I block under Hasnabad Sub- Division P.H.E. Dte. ORD/002571/2021-2022 417/HSD 04/03/2022 10 UNIFIED ENGINEERS' CO-OPERATIVE SOCIETYLTD. 3.87 0.00 1
1633 Barasat Division Acceptance cum work order for Emergent restoration of existing pilling works to sustain the protection of UPVC distribution pipe line at different places within Hingalganj w/s scheme (Zone-II), Hingalganj block under Hasnabad Sub- Division P.H.E. Dte. ORD/002572/2021-2022 406/HSD 04/03/2022 10 S.K.ENTERPRISE. 3.98 3.97 1
1634 Barasat Division Acceptance cum work order for Emergent restoration of existing pilling works to sustain the protection of UPVC distribution pipe line at different places within Bermajur w/s scheme, Sandeshkhali-I block under Hasnabad Sub- Division P.H.E. Dte. ORD/002573/2021-2022 417/HSD 04/03/2022 10 UNIFIED ENGINEERS' CO-OPERATIVE SOCIETYLTD. 3.87 3.89 1
1635 Barasat Division Continuation work order for the work of Hiring Diesel Luxury Car on daily basis (for 6months from 01-04-2022 to 30-09-2022) for the Office of the Executive Engineer, Barasat Division, PHE Dte. ORD/002600/2021-2022 962/BD 29/03/2022 6 MADHAB CHANDRA DAS 0.90 1.32 1
1636 Barasat Division Continuation work order for the work of Hiring Diesel Luxury Car on daily basis ( from 01-01-2022 to 30-06-2022) for the Office use of the Dy. Superintending Engineer-I, Monitoring Cell, PHE Dte ORD/002639/2021-2022 2688/ BD 31/12/2021 181 DIPANKAR NASKAR. 0.86 0.00 1
1637 Barasat Division Construction of boundary wall within brick structure & approach road at O.H.R. site within Sultanpur Water Supply Scheme. ORD/002645/2021-2022 548/BD. 23/02/2022 30 MONDAL & CO. (BASIRHAT). 14.69 14.69 1
1638 Barasat Division Continuation Order for Hiring Diesel Luxury Car on daily basis (for 4 months from 01.03.2022 to 30.06.2022) for the office use of the Assistant Engineer, Basirhat Sub-Division P.H.E. Dte. ORD/002654/2021-2022 178/BHTSD 25/02/2022 120 DEB KUMAR DAS. 0.58 1.83 1
1639 Barasat Division Sinking of 300 Mtr.Deep 100X40 mm dia Trial- cum-production Tube-Well fitting with PVC Pipes and strainer with Indian Mark-II at Joypur Gopmahal of Basirhat-II Block under Barasat Division PHE Dte. ORD/002657/2021-2022 1111/ BHT SD 27/08/2021 20 M/S MAA TARA ENTERPRISE 2.34 1.95 1
1640 Barasat Division Acceptance cum Work Order for Sinking of 1 no. 300 mm. x 200 mm. dia. 214 mtr deep tube well by D.R. Rig method having 250 mm. dia. 36 mtr. long housing pipe & 150 mm. dia. 30 mtr. long Filter at Ward No.- 6 under Ashokenagar-Kalyangar Municipality within the jurisdiction of Habra Sub-Division under Barasat Division, P.H.E. Dte. ORD/002671/2021-2022 2452/BD 17/12/2021 30 NADIA TUBEWELLS 2.89 2.89 1
1641 Barasat Division Hiring of Luxury Car (Diesel) for the office use of the Assistant Engineer Bongaon Sub-Division, P.H.E. Dte. Under Bongaon Sub-Division P.H.E. Dte. (Period from 01.02.2022 to 31.01.2023.) ORD/002673/2021-2022 45/Bon 31/01/2022 12 ROY ENGINEERS. 1.73 1.16 1
1642 Barasat Division Route Survey, Design Drawing & DPR Preparation for RAJNAGAR Water Supply Scheme in Basirhat-II Block under Barasat Division, PHE Dte. ORD/002679/2021-2022 208/BHTSD 28/02/2022 15 SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. 2.72 0.00 1
1643 Barasat Division Route Survey, Design Drawing & Preparation of DPR for Bansghata Water Supply Scheme in Bagdah Block within the Jurisdiction of Bongaon Sub-Division under Barasat Division, PHE Dte. ORD/002680/2021-2022 142/Bon 18/02/2022 15 SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. 4.84 0.00 1
1644 Barasat Division Route Survey, Design Drawing & DPR Preparation for BARA BANKRA Water Supply Scheme in Swarupnagar Block under Barasat Division, PHE Dte. ORD/002681/2021-2022 441 /BHTSD 22/03/2022 15 SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. 4.57 4.57 1
1645 Barasat Division Acceptance cum work order for Route Survey, Design Drawing & DPR Preparation for Augmentation of RUPMARI Water Supply Scheme under Barasat Division, PHE Dte. ORD/002687/2021-2022 228/HSD 02/02/2022 15 SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. 4.81 4.81 1
1646 Barasat Division Acceptance cum work order for Route Survey, Design Drawing & DPR Preparation for Augmentation of BOUTHAKURANI Water Supply Scheme under Barasat Division, PHE Dte. ORD/002688/2021-2022 230/HSD 02/02/2022 15 UMWELT ENGINEER PVT.LTD. 4.81 4.81 1
1647 Barasat Division Acceptance cum work order for Survey, Design Drawing & DPR Preparation for NEW PWSS (KATAKHALI Water Supply Scheme) in HASNABAD BLOCK under Barasat Division, PHE Dte. (PART-A) ORD/002689/2021-2022 231/HSD 02/02/2022 15 SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. 4.83 4.83 1
1648 Barasat Division Acceptance cum work order for Survey, Design Drawing & DPR Preparation for NEW PWSS (KATAKHALI Water Supply Scheme) in HASNABAD BLOCK under Barasat Division, PHE Dte. (PART-B) ORD/002690/2021-2022 232/HSD 02/02/2022 15 TIYAS CONSULTANCY AND INFRASTRUCTURE PVT.LTD. 4.01 4.01 1
1649 Barasat Division Acceptance cum work order for Survey, Design Drawing & DPR Preparation for NEW PWSS (AMBARIA Water Supply Scheme) in HINGALGANJ BLOCK under Barasat Division, PHE Dte. (PART-A) ORD/002691/2021-2022 233/HSD 02/02/2022 15 SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. 4.83 4.83 1
1650 Barasat Division Acceptance cum work order for Survey, Design Drawing & DPR Preparation for NEW PWSS (AMBARIA Water Supply Scheme) in HINGALGANJ BLOCK under Barasat Division, PHE Dte. (PART-B) ORD/002692/2021-2022 234/HSD 02/02/2022 15 SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. 4.29 4.29 1
1651 Barasat Division Acceptance cum work order for Survey, Design Drawing & DPR Preparation for NEW PWSS (BHANDARKHALI Water Supply Scheme) in HINGALGANJ BLOCK under Barasat Division, PHE Dte. (PART-A) ORD/002693/2021-2022 235/HSD 02/02/2022 15 SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. 4.83 4.83 1
1652 Barasat Division Acceptance cum work order for Survey, Design Drawing & DPR Preparation for NEW PWSS (BHANDARKHALI Water Supply Scheme) in HINGALGANJ BLOCK under Barasat Division, PHE Dte. (PART-B) ORD/002694/2021-2022 236/HSD 02/02/2022 15 SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. 4.83 4.83 1
1653 Barasat Division Acceptance cum work order for Survey, Design Drawing & DPR Preparation for NEW PWSS (KETARCHAK Water Supply Scheme) in HINGALGANJ BLOCK under Barasat Division, PHE Dte. (PART-A) ORD/002695/2021-2022 237/HSD 02/02/2022 15 SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. 4.82 4.82 1
1654 Barasat Division Acceptance cum work order for Survey, Design Drawing & DPR Preparation for NEW PWSS (KETARCHAK Water Supply Scheme) in HINGALGANJ BLOCK under Barasat Division, PHE Dte. (PART-B) ORD/002696/2021-2022 238/HSD 02/02/2022 15 SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. 4.83 4.83 1
1655 Barasat Division Acceptance cum work order for Survey, Design Drawing & DPR Preparation for NEW PWSS (ATPUKUR Z-I Water Supply Scheme) in MINAKHAN BLOCK under Barasat Division, PHE Dte. (PART-A) ORD/002697/2021-2022 239/HSD 02/02/2022 15 UMWELT ENGINEER PVT.LTD. 4.83 4.83 0
1656 Barasat Division Acceptance cum work order for Survey, Design Drawing & DPR Preparation for NEW PWSS (ATPUKUR Z-I Water Supply Scheme) in MINAKHAN BLOCK under Barasat Division, PHE Dte. (PART-B) ORD/002698/2021-2022 240/HSD 02/02/2022 15 SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. 3.60 3.60 0
1657 Barasat Division Acceptance cum work order for Survey, Design Drawing & DPR Preparation for NEW PWSS (ATPUKUR Z-II Water Supply Scheme) in MINAKHAN BLOCK under Barasat Division, PHE Dte. (PART-A) ORD/002699/2021-2022 241/HSD 02/02/2022 15 SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. 4.63 4.63 1
1658 Barasat Division Acceptance cum work order for Additional Survey Work For DPR Preparation of Augmentation of RUPMARI Water Supply Scheme under Barasat Division, PHE Dte. ORD/002700/2021-2022 229/HSD 02/02/2022 15 SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. 1.04 1.04 1
1659 Barasat Division Acceptance cum work order for Survey, Design Drawing & DPR Preparation for NEW PWSS (BACHHRA Water Supply Scheme) in MINAKHAN BLOCK under Barasat Division, PHE Dte. (PART-A) ORD/002701/2021-2022 244/HSD 03/02/2022 15 SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. 4.80 4.80 1
1660 Barasat Division Acceptance cum work order for Survey, Design Drawing & DPR Preparation for NEW PWSS (BARGAN GOPALPUR Water Supply Scheme) in MINAKHAN BLOCK under Barasat Division, PHE Dte. (PART-A) ORD/002702/2021-2022 247/HSD 03/02/2022 15 SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. 4.82 4.82 0
1661 Barasat Division Acceptance cum work order for Survey, Design Drawing & DPR Preparation for NEW PWSS (BAMANPUKURIA Water Supply Scheme) in MINAKHAN BLOCK under Barasat Division, PHE Dte. (PART-B) ORD/002703/2021-2022 246/HSD 03/02/2022 15 TIYAS CONSULTANCY AND INFRASTRUCTURE PVT.LTD. 3.99 3.99 1
1662 Barasat Division Acceptance cum work order for Survey, Design Drawing & DPR Preparation for NEW PWSS (BAMANPUKURIA Water Supply Scheme) in MINAKHAN BLOCK under Barasat Division, PHE Dte. (PART-A) ORD/002704/2021-2022 245/HSD 03/02/2022 15 SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. 4.83 4.83 1
1663 Barasat Division Acceptance cum work order for Survey, Design Drawing & DPR Preparation for NEW PWSS (BARGAN GOPALPUR Water Supply Scheme) in MINAKHAN BLOCK under Barasat Division, PHE Dte. (PART-B) ORD/002705/2021-2022 248/HSD 03/02/2022 15 UMWELT ENGINEER PVT.LTD. 3.20 3.20 1
1664 Barasat Division Acceptance cum work order for Survey, Design Drawing & DPR Preparation for NEW PWSS (CHUTKIA RADHANAGAR Water Supply Scheme) in MINAKHAN BLOCK under Barasat Division, PHE Dte. (PART-A) ORD/002706/2021-2022 249/HSD 03/02/2022 15 SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. 4.82 4.82 0
1665 Barasat Division Acceptance cum work order for Survey, Design Drawing & DPR Preparation for NEW PWSS (CHUTKIA RADHANAGAR Water Supply Scheme) in MINAKHAN BLOCK under Barasat Division, PHE Dte. (PART-B) ORD/002708/2021-2022 271/HSD 09/02/2022 15 SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. 0.85 0.85 1
1666 Barasat Division Acceptance cum work order for Survey, Design Drawing & DPR Preparation for NEW PWSS (DEBITALA Water Supply Scheme) in MINAKHAN BLOCK under Barasat Division, PHE Dte. (PART-A) ORD/002709/2021-2022 272/HSD 09/02/2022 15 UMWELT ENGINEER PVT.LTD. 4.82 4.82 1
1667 Barasat Division Acceptance cum work order for Survey, Design Drawing & DPR Preparation for NEW PWSS (DEBITALA Water Supply Scheme) in MINAKHAN BLOCK under Barasat Division, PHE Dte. (PART-B) ORD/002710/2021-2022 273/HSD 09/02/2022 15 SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. 2.48 2.48 1
1668 Barasat Division Acceptance cum work order for Survey, Design Drawing & DPR Preparation for NEW PWSS (GHIPUKURIA Water Supply Scheme) in MINAKHAN BLOCK under Barasat Division, PHE Dte. (PART-A) ORD/002711/2021-2022 274/HSD 09/02/2022 15 SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. 4.83 4.83 1
1669 Barasat Division Acceptance cum work order for Survey, Design Drawing & DPR Preparation for NEW PWSS (GHIPUKURIA Water Supply Scheme) in MINAKHAN BLOCK under Barasat Division, PHE Dte. (PART-B) ORD/002712/2021-2022 275/HSD 09/02/2022 15 SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. 0.83 0.83 1
1670 Barasat Division Acceptance cum work order for Survey, Design Drawing & DPR Preparation for NEW PWSS (HATBHANGA Water Supply Scheme) in MINAKHAN BLOCK under Barasat Division, PHE Dte. (PART-A) ORD/002713/2021-2022 276/HSD 09/02/2022 15 SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. 4.83 4.83 1
1671 Barasat Division Acceptance cum work order for Survey, Design Drawing & DPR Preparation for NEW PWSS (HATBHANGA Water Supply Scheme) in MINAKHAN BLOCK under Barasat Division, PHE Dte. (PART-B) ORD/002714/2021-2022 277/HSD 09/02/2022 15 TIYAS CONSULTANCY AND INFRASTRUCTURE PVT.LTD. 0.80 0.80 1
1672 Barasat Division Acceptance cum work order for Survey, Design Drawing & DPR Preparation for NEW PWSS (JHIKRA Water Supply Scheme) in MINAKHAN BLOCK under Barasat Division, PHE Dte. (PART-A) ORD/002715/2021-2022 278/HSD 09/02/2022 15 SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. 4.83 4.83 1
1673 Barasat Division Acceptance cum work order for Survey, Design Drawing & DPR Preparation for NEW PWSS (JHIKRA Water Supply Scheme) in MINAKHAN BLOCK under Barasat Division, PHE Dte. (PART-B) ORD/002716/2021-2022 279/HSD 09/02/2022 15 TIYAS CONSULTANCY AND INFRASTRUCTURE PVT.LTD. 1.46 1.46 1
1674 Barasat Division Acceptance cum work order for Survey, Design Drawing & DPR Preparation for NEW PWSS (KACHURHULA Z-I Water Supply Scheme) in MINAKHAN BLOCK under Barasat Division, PHE Dte ORD/002717/2021-2022 280/HSD 09/02/2022 15 SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. 4.50 4.50 1
1675 Barasat Division Acceptance cum work order for Survey, Design Drawing & DPR Preparation for NEW PWSS (KACHURHULA Z-II Water Supply Scheme) in MINAKHAN BLOCK under Barasat Division, PHE Dte. ORD/002718/2021-2022 281/HSD 09/02/2022 15 SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. 3.09 3.09 1
1676 Barasat Division Acceptance cum work order for Survey, Design Drawing & DPR Preparation for NEW PWSS (KHARIBARIA Water Supply Scheme) in MINAKHAN BLOCK under Barasat Division, PHE Dte. (PART-A) ORD/002719/2021-2022 282/HSD 09/02/2022 15 SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. 4.83 4.83 0
1677 Barasat Division Acceptance cum work order for Survey, Design Drawing & DPR Preparation for NEW PWSS (KHARIBARIA Water Supply Scheme) in MINAKHAN BLOCK under Barasat Division, PHE Dte. (PART-B). ORD/002720/2021-2022 283/HSD 09/02/2022 15 SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. 2.49 2.49 0
1678 Barasat Division Acceptance cum work order for Survey, Design Drawing & DPR Preparation for NEW PWSS (KUSANGRA Water Supply Scheme) in MINAKHAN BLOCK under Barasat Division, PHE Dte. (PART-A) ORD/002721/2021-2022 284/HSD 09/02/2022 15 SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. 4.83 4.83 0
1679 Barasat Division Acceptance cum work order for Survey, Design Drawing & DPR Preparation for NEW PWSS (KUSANGRA Water Supply Scheme) in MINAKHAN BLOCK under Barasat Division, PHE Dte. (PART-B) ORD/002722/2021-2022 287/HSD 10/02/2022 15 SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. 3.44 3.44 0
1680 Barasat Division Acceptance cum work order for Survey, Design Drawing & DPR Preparation for NEW PWSS (NIRULI Water Supply Scheme) in MINAKHAN BLOCK under Barasat Division, PHE Dte. (PART-A) ORD/002723/2021-2022 290/HSD 10/02/2022 15 SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. 4.83 4.83 1
1681 Barasat Division Acceptance cum work order for Survey, Design Drawing & DPR Preparation for NEW PWSS (MALLIKGHERI Water Supply Scheme) in MINAKHAN BLOCK under Barasat Division, PHE Dte. (PART-B) ORD/002724/2021-2022 289/HSD 10/02/2022 15 SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. 2.81 2.81 0
1682 Barasat Division Acceptance cum work order for Survey, Design Drawing & DPR Preparation for NEW PWSS (MALLIKGHERI Water Supply Scheme) in MINAKHAN BLOCK under Barasat Division, PHE Dte. (PART-A) ORD/002727/2021-2022 288/HSD 10/02/2022 15 SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. 4.83 4.83 0
1683 Barasat Division Acceptance cum work order for Survey, Design Drawing & DPR Preparation for NEW PWSS (NIRULI Water Supply Scheme) in MINAKHAN BLOCK under Barasat Division, PHE Dte. (PART-B) ORD/002728/2021-2022 291/HSD 10/02/2022 15 SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. 1.05 1.05 1
1684 Barasat Division Acceptance cum work order for Survey, Design Drawing & DPR Preparation for NEW PWSS (NIRULI ABAD Water Supply Scheme) in MINAKHAN BLOCK under Barasat Division, PHE Dte. ORD/002729/2021-2022 292/HSD 10/02/2022 15 SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. 3.68 3.68 1
1685 Barasat Division Acceptance cum work order for Survey, Design Drawing & DPR Preparation for NEW PWSS (PHULBARI ABAD Water Supply Scheme) in MINAKHAN BLOCK under Barasat Division, PHE Dte. (PART-A) ORD/002730/2021-2022 306/HSD 15/02/2022 15 SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. 4.82 4.82 1
1686 Barasat Division Acceptance cum work order for Survey, Design Drawing & DPR Preparation for NEW PWSS (PIPULDAHA Water Supply Scheme) in MINAKHAN BLOCK under Barasat Division, PHE Dte. ORD/002731/2021-2022 307/HSD 15/02/2022 15 SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. 4.26 4.26 1
1687 Barasat Division Acceptance cum work order for Survey, Design Drawing & DPR Preparation for NEW PWSS (SANKARDAHA Water Supply Scheme) in MINAKHAN BLOCK under Barasat Division, PHE Dte. (PART-A) ORD/002732/2021-2022 308/HSD 15/02/2022 15 SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. 4.83 4.83 0
1688 Barasat Division Acceptance cum work order for Survey, Design Drawing & DPR Preparation for NEW PWSS (SANKARDAHA Water Supply Scheme) in MINAKHAN BLOCK under Barasat Division, PHE Dte. (PART-B) ORD/002733/2021-2022 309/HSD 15/02/2022 15 SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. 2.06 2.06 0
1689 Barasat Division Acceptance cum work order for Survey, Design Drawing & DPR Preparation for NEW PWSS (TAPLA KUSANGRA Water Supply Scheme) in MINAKHAN BLOCK under Barasat Division, PHE Dte. (PART-A) ORD/002734/2021-2022 310/HSD 15/02/2022 15 TIYAS CONSULTANCY AND INFRASTRUCTURE PVT.LTD. 4.82 4.82 1
1690 Barasat Division Acceptance cum work order for Survey, Design Drawing & DPR Preparation for NEW PWSS (TAPLA KUSANGRA Water Supply Scheme) in MINAKHAN BLOCK under Barasat Division, PHE Dte. (PART-B) ORD/002735/2021-2022 311/HSD 15/02/2022 15 TIYAS CONSULTANCY AND INFRASTRUCTURE PVT.LTD. 0.52 0.52 1
1691 Barasat Division Acceptance cum work order for Survey, Design Drawing & DPR Preparation for NEW PWSS (UCHILDAHA Water Supply Scheme) in MINAKHAN BLOCK under Barasat Division, PHE Dte. (PART-A) ORD/002736/2021-2022 312/HSD 15/02/2022 15 SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. 4.83 4.83 1
1692 Barasat Division Acceptance cum work order for Survey, Design Drawing & DPR Preparation for NEW PWSS (UCHILDAHA Water Supply Scheme) in MINAKHAN BLOCK under Barasat Division, PHE Dte. (PART-B) ORD/002737/2021-2022 313/HSD 15/02/2022 15 TIYAS CONSULTANCY AND INFRASTRUCTURE PVT.LTD. 3.89 3.89 0
1693 Barasat Division Acceptance cum work order for Survey, Design Drawing & DPR Preparation for NEW PWSS (DAKSHIN AKHRATALA Water Supply Scheme) in SANDESHKHALI-I BLOCK under Barasat Division, PHE Dte. (PART-A) ORD/002738/2021-2022 314/HSD 15/02/2022 15 SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. 4.83 4.83 100
1694 Barasat Division Acceptance cum work order for Survey, Design Drawing & DPR Preparation for NEW PWSS (DAKSHIN AKHRATALA Water Supply Scheme) in SANDESHKHALI-I BLOCK under Barasat Division, PHE Dte. (PART-B) ORD/002739/2021-2022 315/HSD 15/02/2022 15 SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. 4.82 4.82 100
1695 Barasat Division Acceptance cum work order for Survey, Design Drawing & DPR Preparation for NEW PWSS (DAKSHIN AKHRATALA Water Supply Scheme) in SANDESHKHALI-I BLOCK under Barasat Division, PHE Dte. (PART-C) ORD/002740/2021-2022 336/HSD 21/02/2022 15 SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. 4.83 4.83 100
1696 Barasat Division Acceptance cum work order for Survey, Design Drawing & DPR Preparation for NEW PWSS (KHARIAT ABAD Water Supply Scheme) in SANDESHKHALI-I BLOCK under Barasat Division, PHE Dte. (PART-A) ORD/002741/2021-2022 337/HSD 21/02/2022 15 TIYAS CONSULTANCY AND INFRASTRUCTURE PVT.LTD. 4.83 4.83 1
1697 Barasat Division Acceptance cum work order for Survey, Design Drawing & DPR Preparation for NEW PWSS (KHARIAT ABAD Water Supply Scheme) in SANDESHKHALI-I BLOCK under Barasat Division, PHE Dte. (PART-B) ORD/002742/2021-2022 338/HSD 21/02/2022 15 SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. 4.83 4.83 1
1698 Barasat Division Acceptance cum work order for Survey, Design Drawing & DPR Preparation for NEW PWSS (KHARIAT ABAD Water Supply Scheme) in SANDESHKHALI-I BLOCK under Barasat Division, PHE Dte. (PART-C) ORD/002743/2021-2022 347/HSD 21/02/2022 15 SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. 1.72 1.72 1
1699 Barasat Division Acceptance cum work order for Survey, Design Drawing & DPR Preparation for NEW PWSS (MATBARI ABAD Water Supply Scheme) in SANDESHKHALI-I BLOCK under Barasat Division, PHE Dte. (PART-A). ORD/002744/2021-2022 348/HSD 21/02/2022 15 TIYAS CONSULTANCY AND INFRASTRUCTURE PVT.LTD. 4.83 4.83 1
1700 Barasat Division Acceptance cum work order for Survey, Design Drawing & DPR Preparation for NEW PWSS (MATBARI ABAD Water Supply Scheme) in SANDESHKHALI-I BLOCK under Barasat Division, PHE Dte. (PART-B) ORD/002745/2021-2022 349/HSD 21/02/2022 15 SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. 4.82 4.82 1
1701 Barasat Division Acceptance cum work order for Survey, Design Drawing & DPR Preparation for NEW PWSS (PETUA DHANIHATI Water Supply Scheme) in SANDESHKHALI-I BLOCK under Barasat Division, PHE Dte. (PART-A) ORD/002746/2021-2022 350/HSD 21/02/2022 15 SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. 4.83 4.83 1
1702 Barasat Division Acceptance cum work order for Survey, Design Drawing & DPR Preparation for NEW PWSS (PETUA DHANIHATI Water Supply Scheme) in SANDESHKHALI-I BLOCK under Barasat Division, PHE Dte. (PART-B) ORD/002747/2021-2022 351/HSD 21/02/2022 15 SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. 4.51 4.51 1
1703 Barasat Division Route Survey, Design Drawing & DPR Preparation for Nalabara Water Supply Scheme in Swarupnagar Block under Barasat Division, PHE Dte. ORD/002751/2021-2022 454/ BHTSD 23/03/2022 15 SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. 4.97 4.97 1
1704 Barasat Division Route Survey, Design Drawing & DPR Preparation for Nalabara Water Supply Scheme in Swarupnagar Block under Barasat Division, PHE Dte. ORD/002752/2021-2022 455/ BHTSD 22/03/2022 15 SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. 3.61 3.61 1
1705 Barasat Division Route Survey, Design Drawing & DPR Preparation for Nabatkati Water Supply Scheme in Swarupnagar Block under Barasat Division, PHE Dte. ORD/002753/2021-2022 459/ BHTSD 22/03/2022 15 SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. 3.81 3.81 1
1706 Barasat Division Route Survey, Design Drawing & DPR Preparation for Dakshin Chatra Zone II Water Supply Scheme in Swarupnagar Block under Barasat Division, PHE Dte. ORD/002754/2021-2022 442/ BHTSD 22/03/2022 15 SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. 4.04 4.04 1
1707 Barasat Division Route Survey, Design Drawing & DPR Preparation for Patua Water Supply Scheme in Swarupnagar Block under Barasat Division, PHE Dte. ORD/002755/2021-2022 444/ BHTSD 22/03/2022 15 SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. 4.16 4.16 1
1708 Barasat Division Route Survey, Design Drawing & DPR Preparation for Dobila Water Supply Scheme in Swarupnagar Block under Barasat Division, PHE Dte. ORD/002756/2021-2022 449/ BHTSD 22/03/2022 15 SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. 3.50 3.50 1
1709 Barasat Division Route Survey, Design Drawing & DPR Preparation for Gokulpur Water Supply Scheme in Swarupnagar Block under Barasat Division, PHE Dte. ORD/002757/2021-2022 448/ BHTSD 23/03/2022 150 SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. 4.32 4.32 1
1710 Barasat Division Route Survey, Design Drawing & DPR Preparation for Taranipur Zone I Water Supply Scheme in Swarupnagar Block under Barasat Division, PHE Dte. ORD/002758/2021-2022 446/ BHTSD 22/03/2022 15 SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. 3.69 3.69 1
1711 Barasat Division Route Survey, Design Drawing & DPR Preparation for Kapileswarpur Water Supply Scheme in Swarupnagar Block under Barasat Division, PHE Dte. ORD/002759/2021-2022 445/ BHTSD 22/03/2022 15 SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. 4.04 4.04 1
1712 Barasat Division Route Survey, Design Drawing & DPR Preparation for MAMINPUR Water Supply Scheme in Basirhat-II Block under Barasat Division, PHE Dte. ORD/002760/2021-2022 305/ BHTSD 07/03/2022 15 SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. 3.15 2.98 1
1713 Barasat Division Route Survey, Design Drawing & DPR Preparation for Nityanadakati Balti Water Supply Scheme in Basirhat-II Block under Barasat Division, PHE Dte. ORD/002761/2021-2022 440/ BHTSD 22/03/2022 15 SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. 3.69 3.69 1
1714 Barasat Division Route Survey, Design Drawing & DPR Preparation for Matiagacha W/S Scheme in Habra - II Block under Barasat Division, P.H.E. Dte. ORD/002763/2021-2022 128/HAB 16/03/2022 10 SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. 3.35 3.27 1
1715 Barasat Division Route Survey, Design Drawing & Preparation of DPR for Chhaygharia (Zone-I) Water Supply Scheme in Bongaon Block within the Jurisdiction of Bongaon Sub-Division under Barasat Division, PHE Dte. ORD/002770/2021-2022 123/BON 18/02/2022 15 SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. 3.45 3.45 1
1716 Barasat Division Route Survey, Design Drawing & Preparation of DPR for Chhaygharia (Zone-II) Water Supply Scheme in Bongaon Block within the Jurisdiction of Bongaon Sub-Division under Barasat Division, PHE Dte. ORD/002771/2021-2022 124/Bon 18/02/2022 15 SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. 2.98 2.98 1
1717 Barasat Division Route Survey, Design Drawing & Preparation of DPR for Bharatpur Water Supply Scheme in Bongaon Block within the Jurisdiction of Bongaon Sub-Division under Barasat Division, PHE Dte. ORD/002773/2021-2022 126/Bon 18/02/2022 15 SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. 2.98 2.98 1
1718 Barasat Division Route Survey, Design Drawing & Preparation of DPR for Gadpukuria (Zone-II) Water Supply Scheme in Bagdah Block within the Jurisdiction of Bongaon Sub-Division under Barasat Division, PHE Dte. ORD/002777/2021-2022 129/Bon 18/02/2022 15 SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. 3.73 3.73 1
1719 Barasat Division Route Survey, Design Drawing & Preparation of DPR for Ghatpatila (Zone-II) Water Supply Scheme in Bagdah Block within the Jurisdiction of Bongaon Sub-Division under Barasat Division, PHE Dte. ORD/002779/2021-2022 131/Bon 18/02/2022 15 SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. 3.89 3.89 1
1720 Barasat Division Route Survey, Design Drawing & DPR Preparation for RAJNAGAR Water Supply Scheme in Basirhat-II Block under Barasat Division, PHE Dte. ORD/002780/2021-2022 208/ BHTSD 28/02/2022 15 SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. 2.72 2.63 1
1721 Barasat Division Route Survey, Design Drawing & DPR Preparation for GOBINDAPUR DHOKRA Water Supply Scheme in Basirhat-II Block under Barasat Division, PHE Dte. ORD/002781/2021-2022 205/ BHTSD 28/02/2022 15 SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. 3.86 3.77 1
1722 Barasat Division Route Survey, Design Drawing & DPR Preparation for SADIKNAGAR-I Water Supply Scheme in Basirhat-II Block under Barasat Division, PHE Dte. ORD/002782/2021-2022 206/ BHTSD 28/02/2022 15 SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. 4.15 3.96 1
1723 Barasat Division Route Survey, Design Drawing & DPR Preparation for GACHHARATI Water Supply Scheme in Basirhat-I Block under Barasat Division, PHE Dte. ORD/002783/2021-2022 199/ BHTSD 28/02/2022 15 SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. 2.69 2.63 1
1724 Barasat Division Route Survey, Design Drawing & Preparation of DPR for Kurulia (Zone-I) Water Supply Scheme in Bagdah Block within the Jurisdiction of Bongaon Sub-Division under Barasat Division, PHE Dte. ORD/002784/2021-2022 138/BON 18/02/2022 15 UMWELT ENGINEER PVT.LTD. 4.05 4.03 1
1725 Barasat Division Route Survey, Design Drawing & Preparation of DPR for Malidah Water Supply Scheme in Bagdah Block within the Jurisdiction of Bongaon Sub-Division under Barasat Division, PHE Dte. ORD/002785/2021-2022 140/BON 18/02/2022 15 SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. 3.74 3.72 1
1726 Barasat Division Route Survey, Design Drawing & Preparation of DPR for Kola Water Supply Scheme in Bagdah Block within the Jurisdiction of Bongaon Sub-Division under Barasat Division, PHE Dte. ORD/002786/2021-2022 136/BON 18/02/2022 15 SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. 3.64 3.62 1
1727 Barasat Division Route Survey, Design Drawing & Preparation of DPR for Chhaygharia (Zone-III) Water Supply Scheme in Bongaon Block within the Jurisdiction of Bongaon Sub-Division under Barasat Division, PHE Dte. ORD/002787/2021-2022 125/BON 18/02/2022 15 SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. 3.42 3.40 1
1728 Barasat Division Route Survey, Design Drawing & Preparation of DPR for Chowberia Water Supply Scheme in Bongaon Block within the Jurisdiction of Bongaon Sub-Division under Barasat Division, PHE Dte. ORD/002788/2021-2022 127/BON 18/02/2022 15 SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. 3.45 3.43 1
1729 Barasat Division Route Survey, Design Drawing & Preparation of DPR for Kalupur Water Supply Scheme in Bongaon Block within the Jurisdiction of Bongaon Sub-Division under Barasat Division, PHE Dte. ORD/002789/2021-2022 122/BON 18/02/2022 15 SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. 3.80 3.77 1
1730 Barasat Division Route Survey, Design Drawing & Preparation of DPR for Bansghata Water Supply Scheme in Bagdah Block within the Jurisdiction of Bongaon Sub-Division under Barasat Division, PHE Dte. ORD/002790/2021-2022 142/BON 18/02/2022 15 SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. 4.84 4.84 1
1731 Barasat Division Route Survey, Design Drawing & DPR Preparation for PASCHIM MADHYAMPUR Water Supply Scheme in Basirhat-I Block under Barasat Division, PHE Dte. ORD/002792/2021-2022 197/ BHTSD 28/02/2022 15 SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. 4.24 3.95 1
1732 Barasat Division Route Survey, Design Drawing & DPR Preparation for SRINAGAR Water Supply Scheme in Basirhat-II Block under Barasat Division, PHE Dte ORD/002793/2021-2022 342/ BHTSD 14/03/2022 15 SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. 4.10 3.92 1
1733 Barasat Division Route Survey, Design Drawing & DPR Preparation for DAKSHIN DEBIPUR Water Supply Scheme in Basirhat-II Block under Barasat Division, PHE Dte. ORD/002794/2021-2022 312/ BHTSD 07/03/2022 15 SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. 2.87 2.87 1
1734 Barasat Division Acceptance cum work order for Emergent restoration of road for damage portion due to newly laid different dia DI/UPVC distribution pipe line at different places within Boyermari mouza in connection with retrofitting of Chunchura w/s scheme, Sandeshkhali-I block under Hasnabad Sub-Division P.H.E. Dte. ORD/002795/2021-2022 355/HSD 23/02/2022 15 ABDUL ALIM MONDAL. 4.78 4.78 1
1735 Barasat Division Acceptance cum work order for Emergent restoration of road for damage portion due to newly laid different dia DI/UPVC distribution pipe line at different places in connection with retrofitting of Chunchura mouza in connection with retrofitting of Chunchura w/s scheme, Sandeshkhali-I block under Hasnabad Sub-Division P.H.E. Dte. ORD/002796/2021-2022 356/hsd 23/02/2022 15 M/S RAJPATH CONSTRUCTION. 4.80 4.80 1
1736 Barasat Division Acceptance cum work order for Additional emergent restoration of road for damage portion due to newly laid different dia DI/UPVC distribution pipe line at different places in connection with retrofitting of Chunchura, Boyermari, Sankardaha Abad, Khas Sankardaha mouza in connection with retrofitting of Chunchura w/s scheme, Sandeshkhali-I block under Hasnabad Sub-Division P.H.E. Dte. ORD/002797/2021-2022 357/HSD 23/02/2022 15 M/S RAJPATH CONSTRUCTION. 4.80 4.77 1
1737 Barasat Division Acceptance cum work order for Emergent casing of UPVC pipe line at different locations over Khal, channel, culverts, roads within Laukhali W/S Scheme, Sandeshkhali-I block under Hasnasbad Sub-Division, P.H.E.Dte. ORD/002798/2021-2022 358/HSD 23/02/2022 15 SRI KRISHNA CO-OP-LABOUR CONTRACT AND CONST SOC LTD. 4.39 4.49 1
1738 Barasat Division Acceptance cum work order for Additional emergent resting of 100/150 mm dia DI pipeline by concrete block at different places within Laukhali w/s scheme, Sandeshkhali-I block under Hasnabad Sub-Division P.H.E. Dte. ORD/002799/2021-2022 359/HSD 23/02/2022 15 MD.SALIM GAZI. 4.19 4.15 1
1739 Barasat Division Acceptance cum work order for Additional emergent resting of 200/250/300 mm dia DI pipeline by concrete block at different places within Laukhali w/s scheme, Sandeshkhali-I block under Hasnabad Sub-Division P.H.E. Dte. ORD/002800/2021-2022 360/HSD 23/02/2022 15 SARKAR ENTERPRISE 4.31 4.26 1
1740 Barasat Division Acceptance cum work order for Emergent restoration of road for damage portion due to newly laid different dia DI/UPVC pipe line at different places at Agarhati Mouza within Laukhali w/s scheme, Sandeshkhali-I block under Hasnabad Sub-Division P.H.E. Dte. ORD/002801/2021-2022 361/HSD 23/02/2022 15 MD.SALIM GAZI. 4.76 4.76 1
1741 Barasat Division Acceptance cum work order for Additional emergent restoration of road for damage portion due to newly laid different dia DI/UPVC pipe line at different places at Agarhati Mouza within Laukhali w/s scheme, Sandeshkhali-I block under Hasnabad Sub-Division P.H.E. Dte. ORD/002802/2021-2022 362/HSD 23/02/2022 15 SRI KRISHNA CO-OP-LABOUR CONTRACT AND CONST SOC LTD. 4.76 4.76 1
1742 Barasat Division Acceptance cum work order for Additional emergent restoration of road for damage portion due to newly laid different dia DI/UPVC pipe line at different places at Patharghata Laukhali Mouza within Laukhali w/s scheme, Sandeshkhali-I block under Hasnabad Sub-Division P.H.E. Dte. ORD/002803/2021-2022 363/HSD 23/02/2022 15 SRI KRISHNA CO-OP-LABOUR CONTRACT AND CONST SOC LTD. 4.76 4.76 1
1743 Barasat Division Acceptance cum work order for Protection work for newly laid Distribution main 300 mm dia DI Pipe with UC bullah pile from HW site to PWD Road within Rampur w/s scheme,Sandeskhali-II block under Hasnabad Sub-Division P.H.E. Dte. ORD/002826/2021-2022 510/HSD 15/03/2022 15 NEW MANGES INDUSTRIAL CORPORATION 2.25 2.01 1
1744 Barasat Division Acceptance cum work order for Emergent resting of distribution main by concrete block for low areas from Pole para to Rampur bazaar in connection with retrofitting of Rampur w/s scheme , Sandeshkhali-II block under Hasnabad Sub-Division P.H.E. Dte. ORD/002827/2021-2022 511/HSD 15/03/2022 15 S.S.ENTERPRISE. (BAMANGACHI) 4.09 4.03 1
1745 Barasat Division Acceptance cum work order for Emergent resting of 100/150 mm dia DI distribution main by concrete block for low areas of Rampur w/s scheme in connection with retrofitting, Sandeshkhali-II block under Hasnabad Sub-Division P.H.E. Dte. ORD/002828/2021-2022 512/HSD 15/03/2022 15 S.S.ENTERPRISE. (BAMANGACHI) 3.05 2.94 1
1746 Barasat Division Acceptance cum work order Emergent restoration of road for damage portion due to newly laid different dia DI/UPVC pipe line at different places at Jeliakhali Purba mouza within Jeliakhali Purbakhanda w/s scheme, Sandeshkhali-II block under Hasnabad Sub-Division P.H.E. Dte. ORD/002835/2021-2022 533/HSD 15/03/2022 15 PRITAM MUKHOPADHYAY. 4.77 4.71 1
1747 Barasat Division Acceptance cum work order for Emergent restoration of road for damage portion due to newly laid different dia DI/UPVC pipe line at different places at Bhanga Tushkhali mouza within Bhanga Tushkhali w/s scheme, Sandeshkhali-II block under Hasnabad Sub-Division P.H.E. Dte. ORD/002837/2021-2022 536/HSD 16/03/2022 15 MD.SALIM GAZI. 4.75 4.68 1
1748 Barasat Division Acceptance cum work order for Emergent resting of 250/200 mm dia DI pipeline by concrete block over existing concrete wall beside Basanti Highway at different places for Chunchura w/s scheme, Sandeshkhali-I block under Hasnabad Sub-Division P.H.E. Dte. ORD/002847/2021-2022 563/HSD 22/03/2022 15 MONDAL & CO. (BASIRHAT). 4.41 4.30 1
1749 Barasat Division Acceptance cum work order for Additional emergent resting of 150/100 mm dia DI pipeline by concrete block over existing concrete wall beside Basanti Highway at different places for Chunchura w/s scheme, Sandeshkhali-I block under Hasnabad Sub-Division P.H.E. Dte. ORD/002848/2021-2022 564/HSD 22/03/2022 15 ANKUSH CONSTRUCTION & CO. 4.41 4.41 1
1750 Barasat Division Acceptance cum work order for Emergent casing of UPVC pipe line at different locations over Khal, channel, culverts, roads within Chunchura W/S Scheme, Sandeshkhali-I block under Hasnasbad Sub-Division, P.H.E.Dte. ORD/002849/2021-2022 565/HSD 22/03/2022 15 MONDAL & CO. (BASIRHAT). 4.38 4.37 1
1751 Barasat Division Acceptance cum work order for Emergent resting of 100/150/200 mm dia DI pipeline by concrete block at different places from Kalupara more to N/H/O Sukumar Mahato within Chunchura w/s scheme, Sandeshkhali-I block under Hasnabad Sub-Division P.H.E. Dte. ORD/002850/2021-2022 566/HSD 22/03/2022 15 ANKUSH CONSTRUCTION & CO. 4.32 4.03 1
1752 Barasat Division Acceptance cum work order for Emergent resting of 100/150/200 mm dia DI pipeline by concrete block at different places from N/H/O Sukumar Mahato to Dheknimari High School within Chunchura w/s scheme, Sandeshkhali-I block under Hasnabad Sub-Division P.H.E. Dte. ORD/002851/2021-2022 567/HSD 22/03/2022 15 MONDAL & CO. (BASIRHAT). 4.32 4.29 1
1753 Barasat Division Acceptance cum work order for Emergent resting of distribution main by concrete block for low areas at Halder Ghery to Pole para in connection with retrofitting of Rampur w/s scheme , Sandeshkhali-II block under Hasnabad Sub-Division P.H.E. Dte. ORD/002852/2021-2022 568/HSD 22/03/2022 15 S.S.ENTERPRISE. (BAMANGACHI) 3.97 3.92 1
1754 Barasat Division Acceptance cum work order for Additional Emergent resting of distribution main by concrete block for low areas at Halder Ghery to Pole para in connection with retrofitting of Rampur w/s scheme , Sandeshkhali-II block under Hasnabad Sub-Division P.H.E. Dte. ORD/002853/2021-2022 569/HSD 22/03/2022 15 NEW MANGES INDUSTRIAL CORPORATION 4.24 4.19 1
1755 Barasat Division Acceptance cum work order for Emergent resting of distribution main by concrete block for low areas at PWD road to Rampur Burning ghat in connection with retrofitting of Rampur w/s scheme , Sandeshkhali-II block under Hasnabad Sub-Division P.H.E. Dte. ORD/002854/2021-2022 570/HSD 22/03/2022 15 S.S.ENTERPRISE. (BAMANGACHI) 4.02 2.38 1
1756 Barasat Division Acceptance cum work order for Emergent resting of 200mm dia DI distribution main by concrete block for low areas in connection with retrofitting of Rampur w/s scheme , Sandeshkhali-II block under Hasnabad Sub-Division P.H.E. Dte. ORD/002855/2021-2022 571/HSD 22/03/2022 15 S.S.ENTERPRISE. (BAMANGACHI) 4.50 3.63 0
1757 Barasat Division Acceptance cum work order for Emergent resting of 250mm dia DI distribution main by concrete block for low areas in connection with retrofitting of Rampur w/s scheme , Sandeshkhali-II block under Hasnabad Sub-Division P.H.E. Dte. ORD/002856/2021-2022 572/HSD 22/03/2022 15 NEW MANGES INDUSTRIAL CORPORATION 4.12 3.28 0
1758 Barasat Division Acceptance cum work order for Emergent resting of different dia UPVC/DI pipeline by UC bullah pile at different places in different mouza while laying of pipeline in connection with retrofitting of Chunchura w/s scheme, Sandeshkhali-I block under Hasnabad Sub- Division P.H.E. Dte. ORD/002857/2021-2022 573/HSD 23/03/2022 15 S. GHOSH & ASSOCIATES PVT. LTD. 2.83 2.82 1
1759 Barasat Division Route Survey, Design Drawing & DPR Preparation for NALKORA Water Supply Scheme in Basirhat-I Block under Barasat Division, PHE Dte. ORD/002858/2021-2022 202/ BHTSD 28/02/2022 15 SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. 2.79 2.61 1
1760 Barasat Division Route Survey, Design Drawing & Preparation of DPR for Chandpara Water Supply Scheme in Gaighata Block within the Jurisdiction of Bongaon Sub-Division under Barasat Division, PHE Dte. ORD/002860/2021-2022 144/Bon 18/02/2022 15 SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. 4.05 0.00 1
1761 Barasat Division Acceptance cum work order for Supply of Mechanized boat on hire basis with providing driver, helper and other requirement as per terms condition and specification as per direction of the EIC under Hasnabad Sub-Division, P.H.E. Dte. Period : 01.07.2021 to 30.06.2022 = 365 days ORD/002867/2021-2022 1112/HSD 29/06/2021 365 RANJIT KUMAR MANDAL. 3.15 1.05 1
1762 Barasat Division Acceptance cum work order for Emergent restoration of road for damage portion due to newly laid 125 mm dia HDPE distribution pipe line from Arsad Miya Bazar to Dhamakhali Busstand in connection with retrofitting of Rampur w/s scheme, Sandeshkhali-II block under Hasnabad Sub-Division P.H.E. Dte. ORD/002870/2021-2022 578/HSD 28/03/2022 15 S.S.ENTERPRISE. (BAMANGACHI) 4.73 3.59 1
1763 Barasat Division Acceptance cum work order for Emergent restoration of pipeline by laying of 90 mm dia. UPVC pipe line at different places of Patkelpota Mouza within Sultanpur W/S Scheme, Minakhan block under Hasnasbad Sub-Division, P.H.E.Dte. ORD/002871/2021-2022 579/HSD 28/03/2022 15 ANKUSH CONSTRUCTION & CO. 4.55 4.13 1
1764 Barasat Division Acceptance cum work order for Emergent restoration of different dia. DI distribution pipe line from near Bankra Bazar to near culvert for damaged portion due to widening & strengthing of PWD road within Hingalganj w/s scheme (Zone-I), Hingalganj Block under Hasnabad Sub-Division P.H.E. Dte. ORD/002873/2021-2022 581/HSD 28/03/2022 15 MONDAL & CO. (BASIRHAT). 3.74 3.67 1
1765 Barasat Division Acceptance cum work order for Emergent restoration of road for damage portion due to newly laid different dia UPVC distribution pipe line at different places of Haldar para,Haldar gheri more & pole para in connection with retrofitting of Rampur w/s scheme, Sandeshkhali-II block under Hasnabad Sub-Division P.H.E. Dte. ORD/002874/2021-2022 582/HSD 28/03/2022 15 S.S.ENTERPRISE. (BAMANGACHI) 4.17 4.11 1
1766 Barasat Division Acceptance cum work order for Emergent restoration of 160 mm dia. HDPE pipe line from PH No- 4 to near Kathabari more due to widening & strengthening of PWD road in connection with retrofitting of Hingalganj w/s scheme (Z-II), Hingalganj Block under Hasnabad Sub- Division P.H.E. Dte. ORD/002875/2021-2022 583/HSD 28/03/2022 15 SARKAR ENTERPRISE 4.94 4.94 1
1767 Barasat Division Acceptance cum work order for Emergent resting of 100/150 mm dia DI pipeline by concrete block at different places within Hingalganj w/s scheme (Zone-I), Hingalganj block under Hasnabad Sub-Division P.H.E. Dte. ORD/002876/2021-2022 584/HSD 28/03/2022 15 TRISHA ENTERPRISE & CO. 3.09 3.06 1
1768 Barasat Division Acceptance cum work order for Emergent restoration of road for damage portion due to newly laid different dia UPVC distribution pipe line at different places of Molla para,Colony para,Samanta Para & Bagdi para connection with retrofitting of Rampur w/s scheme, Sandeshkhali-II block under Hasnabad Sub-Division P.H.E. Dte. ORD/002877/2021-2022 586/HSD 28/03/2022 15 S.S.ENTERPRISE. (BAMANGACHI) 4.06 3.97 1
1769 Barasat Division Acceptance cum work order for Emergent restoration of pipeline by laying of 90 mm dia. UPVC pipe line at different places of Turia Mouza within Sultanpur W/S Scheme, Minakhan block under Hasnasbad Sub-Division, P.H.E.Dte. ORD/002878/2021-2022 587/HSD 28/03/2022 15 MONDAL & CO. (BASIRHAT). 4.57 4.12 1
1770 Barasat Division Acceptance cum work order for Emergent restoration of DI rising main from near culvert to near Sahapur more for damaged portion due to widening & strengthing of PWD road within Hingalganj w/s scheme (Zone-I), Hingalganj Block under Hasnabad Sub-Division P.H.E. Dte. ORD/002879/2021-2022 588/HSD 28/03/2022 15 TRISHA ENTERPRISE & CO. 4.85 4.80 1
1771 Barasat Division Acceptance cum work order for Emergent restoration of pipeline by laying of 90 mm dia. UPVC pipe line at different places of Joykrishnapur Mouza within Sultanpur W/S Scheme, Minakhan block under Hasnasbad Sub-Division, P.H.E.Dte. ORD/002880/2021-2022 589/HSD 28/03/2022 15 ANKUSH CONSTRUCTION & CO. 4.53 4.04 1
1772 Barasat Division Acceptance cum work order for Emergent restoration of road for damage portion due to newly laid different dia UPVC distribution pipe line at different places of Akunji para,Naskar para,Gajen para & 50 Bigha more in connection with retrofitting of Rampur w/s scheme, Sandeshkhali-II block under Hasnabad Sub-Division P.H.E. Dte. ORD/002881/2021-2022 590/HSD 29/03/2022 15 S.S.ENTERPRISE. (BAMANGACHI) 4.75 4.60 1
1773 Barasat Division Acceptance cum work order for Emergent restoration of pipeline by laying of different dia. UPVC pipe line at different places of Patkelpota abad mouza within Sultanpur W/S Scheme, Minakhan block under Hasnasbad Sub-Division, P.H.E.Dte. ORD/002882/2021-2022 591/HSD 29/03/2022 15 TRISHA ENTERPRISE & CO. 4.51 4.24 1
1774 Barasat Division Acceptance cum work order for Emergent withdrawing & relaying of different dia. UPVC pipe line at Hingalganj Bazar area, Hingalganj Hospital, BDO Office, Dk. Hingalganj, Garhpara, Sahapur & other places for damaged portion within Hingalganj W/S Scheme (Z-I), Hingalganj block under Hasnasbad Sub-Division, P.H.E.Dte. ORD/002883/2021-2022 592/HSD 29/03/2022 15 SARKAR ENTERPRISE 4.87 4.87 1
1775 Barasat Division Acceptance cum work order for Emergent restoration of pipeline by withdrawing & relaying of 90mm dia. UPVC pipe line at different places of Joykrishnapur mouza within Sultanpur W/S Scheme, Minakhan block under Hasnasbad Sub-Division, P.H.E.Dte. ORD/002884/2021-2022 593/HSD 29/03/2022 15 ANKUSH CONSTRUCTION & CO. 4.86 4.53 1
1776 Barasat Division Acceptance cum work order for Emergent restoration of different dia. UPVC pipe line at different places in Bankra & Bankra Dobar Mouza due to widening & strengthing of PWD road for damage portion within Hingalganj W/S Scheme (Z-II), Hingalganj block under Hasnasbad Sub-Division, P.H.E.Dte. ORD/002885/2021-2022 594/HSD 29/03/2022 15 M/S NIRMAN CONSTRUCTION. 4.49 4.49 1
1777 Barasat Division Acceptance cum work order for Emergent restoration of pipeline by withdrawing & relaying of different dia. UPVC pipe line at different places of Turia mouza within Sultanpur W/S Scheme, Minakhan block under Hasnasbad Sub-Division, P.H.E.Dte. ORD/002886/2021-2022 595/HSD 31/03/2022 15 MONDAL & CO. (BASIRHAT). 4.81 4.15 1
1778 Barasat Division Acceptance cum work order for Emergent restoration of UPVC pipe line from Hingalganj Kalibari to Hingalganj GP office for damaged portion due to widening & strengthening of PWD road within Hingalganj w/s scheme (Zone-I), Hingalganj Block under Hasnabad Sub-Division, PHE Dte. ORD/002887/2021-2022 596/HSD 31/03/2022 15 TRISHA ENTERPRISE & CO. 4.18 4.18 1
1779 Barasat Division Route Survey,design drawing & DPR Preparation for PARUI Water Supply Scheme in Swarupnagar Block under Barasat Division, PHE Dte. ORD/002888/2021-2022 460/BHTSD 22/03/2022 15 SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. 4.84 4.84 1
1780 Barasat Division Acceptance cum work order for Emergent restoration of road for damage portion due to newly laid different dia UPVC distribution pipe line at different places of Bagdipara to rampur bazar road,rampur ferry ghat to anganwadi centre & 972 bus stand in connection with retrofitting of Rampur w/s scheme, Sandeshkhali-II block under Hasnabad Sub-Division P.H.E. Dte. ORD/002889/2021-2022 598/HSD 31/03/2022 15 NEW MANGES INDUSTRIAL CORPORATION 1.39 1.31 1
1781 Barasat Division Acceptance cum work order for Emergent restoration of pipeline by laying of 90 mm dia. UPVC pipe line at different places of Patkelpota abad mouza within Sultanpur W/S Scheme, Minakhan block under Hasnasbad Sub-Division, P.H.E.Dte. ORD/002890/2021-2022 599/HSD 31/03/2022 15 ANKUSH CONSTRUCTION & CO. 4.56 4.45 1
1782 Barasat Division Acceptance cum work order for Emergent restoration of UPVC pipe line from near Hingalganj GP office to Dakshin Hingalganj at different places (SI office, Garpara, BDO office, Sahapur) for damaged portion within Hingalganj w/s scheme (Zone-I), Hingalganj Block under Hasnabad Sub-Division, PHE Dte. ORD/002891/2021-2022 600/HSD 31/03/2022 15 MONDAL & CO. (BASIRHAT). 4.42 4.42 1
1783 Barasat Division Acceptance cum work order for Emergent restoration of pipeline by laying of different dia. UPVC pipe line at different places of Patkelpota mouza within Sultanpur W/S Scheme, Minakhan block under Hasnasbad Sub-Division, P.H.E.Dte. ORD/002892/2021-2022 601/HSD 31/03/2022 15 TRISHA ENTERPRISE & CO. 4.53 4.29 1
1784 Barasat Division Acceptance cum work order for Emergent restoration of different dia. UPVC pipe line from near Hingalganj Kalibari to near Sahapur more for damaged portion due to widening & Strengthing of PWD road within Hingalganj w/s scheme (Zone-I), Hingalganj Block under Hasnabad Sub-Division, PHE Dte. ORD/002893/2021-2022 602/HSD 31/03/2022 15 MONDAL & CO. (BASIRHAT). 4.26 4.26 1
1785 Barasat Division Acceptance cum work order for Emergent restoration of pipeline by withdrawing & relaying of different dia. UPVC pipe line at different places of Turia mouza within Sultanpur W/S Scheme, Minakhan block under Hasnasbad Sub-Division, P.H.E.Dte. ORD/002894/2021-2022 603/HSD 31/03/2022 15 ANKUSH CONSTRUCTION & CO. 4.78 4.61 1
1786 Barasat Division Route Survey, Design Drawing & DPR Preparation for SANGRAMPUR Water Supply Scheme in Basirhat-I Block under Barasat Division, PHE Dte. ORD/002895/2021-2022 195/BHT SD 28/02/2022 15 SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. 4.84 4.84 1
1787 Barasat Division Additional survey work for DPR Preparation for SIMLA DURGAPUR Water Supply Scheme in Baduria Block under Barasat Division, PHE Dte. ORD/002897/2021-2022 377/BHTSD 16/03/2022 15 SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. 1.66 1.65 1
1788 Barasat Division Route Survey, Design Drawing & Preparation of DPR for Chandapara Water Supply Scheme in Gaighata Block within the Jurisdiction of Bongaon Sub-Division under Barasat Division, PHE Dte. ORD/002898/2021-2022 143/BON 18/02/2022 15 SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. 4.05 4.04 1
1789 Barasat Division Route Survey, Design Drawing & Preparation of DPR for Shimulpur Water Supply Scheme in Gaighata Block withinthe Jurisdiction of Bongaon Sub-Division under Barasat Division, PHE Dte. ORD/002899/2021-2022 144/ BON 18/02/2022 15 SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. 4.34 4.32 1
1790 Barasat Division Repairing & Renovation of 02No. Pump House and allied works at Ramnagar water supply scheme under Bongaon Sub-Division, P.H.E.Dte. ORD/002904/2021-2022 541/BON 03/11/2021 21 MA CONSTRUCTION. 2.52 2.47 1
1791 Barasat Division Repairing & Renovation of 02No. Pump House and allied works at Dhalani water supply scheme under Bongaon Sub-Division, P.H.E.Dte. ORD/002905/2021-2022 595/BON 22/12/2021 21 TAPAN GHOSH. 2.52 0.00 1
1792 Barasat Division Repairing & Renovation 2(Two) nos of Pump House and allied works of Kola water supply scheme under Bongaon Sub-Division, P.H.E.Dte. ORD/002907/2021-2022 527/Bon 01/11/2021 21 ACHINTA KUMAR HALDER. 2.52 2.47 1
1793 Barasat Division Repairing & Renovation 2(Two) nos of Pump House and allied works of Kurulia (Zone-I&II) water supply scheme under Bongaon Sub-Division, P.H.E.Dte. ORD/002909/2021-2022 593/Bon 22/12/2021 21 PRABIR KUMAR MONDAL. 2.52 2.34 1
1794 Barasat Division Repairing & Renovation 2(Two) nos of Pump House and allied works of Diara water supply scheme under Bongaon Sub-Division, P.H.E.Dte. ORD/002910/2021-2022 516/Bon 27/10/2021 21 ROY ENGINEERS. 2.52 2.47 0
1795 Barasat Division Repairing & Renovation 2(Two) nos of Pump House and allied works of Kola water supply scheme under Bongaon Sub-Division, P.H.E.Dte. ORD/002912/2021-2022 516/Bon 31/12/2021 21 ROY ENGINEERS. 2.52 0.00 1
1796 Barasat Division Repairing & Renovation 2(Two) nos of Pump House and allied works of Gadpukuria water supply scheme under Bongaon Sub-Division, P.H.E.Dte. ORD/002925/2021-2022 531/Bon 03/11/2021 21 MA CONSTRUCTION. 2.52 2.49 1
1797 Barasat Division Repairing & Renovation 2(Two) nos of Pump House and allied works of Chhaygharia (Zone-III) water supply scheme under Bongaon Sub-Division, P.H.E.Dte. ORD/002927/2021-2022 535/Bon 03/11/2021 21 VAI ENTERPIRSE. 2.52 2.47 1
1798 Barasat Division Repairing & Renovation 2(Two) nos of Pump House and allied works of Chandpara water supply scheme under Bongaon Sub-Division, P.H.E.Dte. ORD/002928/2021-2022 537/Bon 03/11/2021 21 SAMBHU RAY CHOWDHURY. 2.52 2.47 1
1799 Barasat Division Repairing & Renovation 2(Two) nos of Pump House and allied works of Ghatpatila (Zone-I) water supply scheme under Bongaon Sub-Division, P.H.E.Dte. ORD/002929/2021-2022 539/Bon 03/11/2021 21 ROY CHOWDHURY CONSTRUCTION. 2.52 2.49 1
1800 Barasat Division Repairing & Renovation of 01No. Pump House and allied works at Ashudi water supply scheme under Bongaon Sub-Division, P.H.E.Dte. ORD/002933/2021-2022 528/BON 01/11/2021 21 A.D.ENTERPRISE. 2.52 2.48 1
1801 Barasat Division Repairing & Renovation of 02No. Pump House and allied works at Chikonpara water supply scheme under Bongaon Sub-Division, P.H.E.Dte. ORD/002934/2021-2022 586/BON 15/12/2021 21 MA CONSTRUCTION. 2.52 2.34 1
1802 Barasat Division Repairing & Renovation of 01No. Pump House and allied works at Chikonpara water supply scheme under Bongaon Sub-Division, P.H.E.Dte. ORD/002935/2021-2022 632/BON 31/12/2021 21 MA CONSTRUCTION. 1.26 1.19 1
1803 Barasat Division Repairing & Renovation of 01No. Pump House and allied works at Chandpara water supply scheme under Bongaon Sub-Division, P.H.E.Dte. ORD/002936/2021-2022 634/BON 31/12/2021 21 SAMBHU RAY CHOWDHURY. 1.26 1.14 1
1804 Barasat Division Repairing & Renovation of 01No. Pump House and allied works at Matiagacha water supply scheme under Bongaon Sub-Division, P.H.E.Dte. ORD/002937/2021-2022 530/BON 03/11/2021 21 KAMAL HALDER. 2.52 2.50 1
1805 Barasat Division Repairing & Renovation of 01No. Pump House and allied works at Bharatpur water supply scheme under Bongaon Sub-Division, P.H.E.Dte. ORD/002938/2021-2022 633/BON 31/12/2021 21 GHOSH CONSTRUCTION. 1.26 1.20 1
1806 Barasat Division Repairing & Renovation of 02Nos. Pump House and allied works at Sindrani(ZI&II) water supply scheme under Bongaon Sub-Division, P.H.E.Dte. ORD/002939/2021-2022 594/BON 22/12/2021 21 GHOSH CONSTRUCTION. 2.52 2.34 1
1807 Barasat Division Work order for repairing & renovation of Pump House and allied works of Ichhapur Water Supply Scheme. ORD/002941/2021-2022 540/ BON 03/11/2021 21 ROY ENGINEERS. 2.52 2.48 1
1808 Barasat Division Work order for repairing & renovation of Pump House and allied works of Simulpur Water Supply Scheme. ORD/002943/2021-2022 587/ BON 15/12/2021 21 ONKAR ENTERPRISE. 2.52 2.32 1
1809 Barasat Division Repairing & Renovation of 1 No. Pump House (Size- 5.20 x 7.20) of Head Work Site and allied works at Sohai Swetpur Water Supply Scheme Zone-II under Barasat Sub-Division, P.H.E.Dte. ORD/002944/2021-2022 818/BSD 10/12/2021 30 BHABANI ENTERPRISE. 1.84 1.75 0
1810 Barasat Division Repairing & Renovation of 1 No. Pump House (P.H. No-IV) and allied works at Berachampa Water Supply Scheme Zone-II under Barasat Sub-Division, P.H.E.Dte. ORD/002945/2021-2022 832/BSD 16/12/2021 30 ROMI TREDERS. 1.25 1.18 1
1811 Barasat Division Repairing & Renovation of 02 Nos. Pump House (P.H. No.-II & III) and allied works at Bodai Water Supply Scheme Zone-I under Barasat Sub-Division, P.H.E.Dte. ORD/002948/2021-2022 809/BSD 08/12/2021 30 MONDAL ENTERPRISE. (BARASAT) 2.52 2.33 0
1812 Barasat Division Repairing & Renovation of 02Nos. Pump House and allied works at Chhayageria Zone-I water supply scheme under Bongaon Sub-Division, P.H.E.Dte. ORD/002949/2021-2022 533/BD 03/11/2021 21 DURGA ENTERPRISE. 2.52 2.48 1
1813 Barasat Division Repairing & Renovation of 02 Nos. Pump House (P.H. No.-IV & V) and allied works at Bodai Water Supply Scheme Zone-I under Barasat Sub-Division, P.H.E.Dte. ORD/002950/2021-2022 810/BSD 09/12/2021 30 SUN ENTERPRISE. 2.52 2.32 0
1814 Barasat Division Repairing & Renovation of 1 No. Pump House (Size- 5.20 x 7.20) of Head Work Site and allied works at Matiagachha Water Supply Scheme under Barasat Sub-Division, P.H.E.Dte. ORD/002951/2021-2022 833/BSD 16/12/2021 30 M.ENTERPRISE. 1.85 1.75 1
1815 Barasat Division Repairing & Renovation of 01No. Pump House and allied works at Krishnachandrapur water supply scheme under Bongaon Sub-Division, P.H.E.Dte. ORD/002952/2021-2022 636/BON 31/12/2021 21 ACHINTA KUMAR HALDER. 1.26 1.14 1
1816 Barasat Division Repairing & Renovation of 02 Nos. Pump House (P.H. No.-II & III) and allied works at Berachampa Water Supply Scheme Zone-II under Barasat Sub-Division, P.H.E.Dte. ORD/002953/2021-2022 831/BSD 16/12/2021 30 KABASI ENTERPRISE. 2.51 2.39 1
1817 Barasat Division Repairing & Renovation of 1 No. Pump House (Size- 5.20 x 7.20) of Head Work Site and allied works at Berachampa Water Supply Scheme Zone-II under Barasat Sub-Division, P.H.E.Dte. ORD/002954/2021-2022 830/BSD 16/12/2021 30 P.ENTERPRISE. 1.85 1.75 1
1818 Barasat Division Repairing & Renovation of 02Nos. Pump House and allied works at Kamlabas water supply scheme under Bongaon Sub-Division, P.H.E.Dte. ORD/002955/2021-2022 592/BON 22/12/2021 21 MONDAL & CO.(BON) 2.52 2.31 1
1819 Barasat Division Repairing & Renovation of 1 No. Pump House (P.H. No-II) and allied works at Matiagachha Supply Scheme under Barasat Sub-Division, P.H.E.Dte. ORD/002956/2021-2022 837/BSD 20/12/2021 30 K.D ENTERPRISE. 1.25 0.00 100
1820 Barasat Division Repairing & Renovation of 02Nos. Pump House and allied works at Chhayagharia Zone- II water supply scheme under Bongaon Sub-Division, P.H.E.Dte. ORD/002957/2021-2022 534/BON 03/11/2021 21 PRABIR KUMAR MONDAL. 2.52 2.49 1
1821 Barasat Division Repairing & Renovation of 02Nos. Pump House and allied works at Gangrapota water supply scheme under Bongaon Sub-Division, P.H.E.Dte. ORD/002958/2021-2022 536/BON 03/11/2021 21 GHOSH CONSTRUCTION. 2.52 2.48 1
1822 Barasat Division Route Survey, Design Drawing & DPR Preparation for Bithari Zone-I Water Supply Scheme in Swarupnagar Block under Barasat Division, PHE Dte. ORD/002963/2021-2022 450/BHT 22/03/2022 15 SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. 4.95 4.95 1
1823 Barasat Division Route Survey, Design Drawing & DPR Preparation for Bithari Zone-I Water Supply Scheme in Swarupnagar Block under Barasat Division, PHE Dte. ORD/002964/2021-2022 451/BHT 22/03/2022 15 SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. 1.22 1.22 0
1824 Barasat Division Route Survey, Design Drawing & DPR Preparation for RAJENDRAPUR Water Supply Scheme in Basirhat-II Block under Barasat Division, PHE Dte. ORD/002965/2021-2022 311/BHT 07/03/2022 15 SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. 4.19 3.85 1
1825 Barasat Division Route Survey, Design Drawing & DPR Preparation for Bithari Z-II Water Supply Scheme in Swarupnagar Block under Barasat Division, PHE Dte ORD/002966/2021-2022 452/BHT 22/03/2022 15 SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. 4.75 4.75 1
1826 Barasat Division Additional Survey work for DPR Preparation for BITHARI ZONE -2 Water Supply Scheme in Swarupnagar Block under Barasat Division, PHE Dte. ORD/002967/2021-2022 453/BHT 22/03/2022 15 SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. 0.63 0.63 1
1827 Barasat Division Repairing & Renovation of 01No. Pump House (PH-III) and allied works at Gangrapota water supply scheme under Bongaon Sub-Division, P.H.E.Dte. ORD/002968/2021-2022 635/ BON 31/12/2021 15 GHOSH CONSTRUCTION. 1.26 1.15 1
1828 Barasat Division Repairing & Renovation of 02Nos. Pump House and allied works at Koniara water supply scheme under Bongaon Sub-Division, P.H.E.Dte. ORD/002969/2021-2022 552/ BON 03/11/2021 21 K. ENTERPRISE 2.52 2.49 1
1829 Barasat Division Repairing & Renovation of 02Nos. Pump House and allied works at Malidah water supply scheme under Bongaon Sub-Division, P.H.E.Dte. ORD/002970/2021-2022 526/ BON 01/11/2021 21 TAPAN GHOSH. 2.52 2.48 1
1830 Barasat Division Repairing & Renovation of 02Nos. Pump House and allied works at Gobindapur water supply scheme under Bongaon Sub-Division, P.H.E.Dte. ORD/002971/2021-2022 585/ BON 15/12/2021 21 M/S SAYAN ENTERPRISE. 2.52 2.31 1
1831 Barasat Division Repairing & Renovation of 01No. Pump House and allied works at Shimulur water supply scheme under Bongaon Sub-Division, P.H.E.Dte. ORD/002972/2021-2022 631/ BON 31/12/2021 15 ONKAR ENTERPRISE. 1.26 1.15 1
1832 Barasat Division Repairing & Renovation of 02Nos. Pump House and allied works at Hariharpur water supply scheme under Bongaon Sub-Division, P.H.E.Dte. ORD/002973/2021-2022 521/ BON 28/10/2021 21 ANKIT CONSTRUCTION 2.51 2.46 1
1833 Barasat Division Repairing & renovation of Pump House No. - 1 & 2 of BiraRajibpur W/S scheme within the jurisdiction of Habra Sub-Division under Barasat Division, P.H.E. Dte. ORD/002974/2021-2022 499/HAB 02/12/2021 30 B.M.ENTERPRISE. 2.15 2.10 1
1834 Barasat Division Repairing & renovation of Pump House No. - 1, 2 & 3 of Maslandapur W/S scheme (Zone - I) within the jurisdiction of Habra Sub-Division under Barasat Division, P.H.E. Dte. ORD/002976/2021-2022 489/HAB 30/11/2021 30 ANJALI CONSTRUCTION. 2.77 2.71 1
1835 Barasat Division Repairing & renovation of Pump House No. - 1 & 2 of Maslandapur W/S scheme (Zone - II) within the jurisdiction of Habra Sub-Division under Barasat Division, P.H.E. Dte. ORD/002977/2021-2022 490/HAB 30/11/2021 30 ANJALI CONSTRUCTION. 2.18 2.17 1
1836 Barasat Division Repairing & renovation of Pump House No. - 1 & 2 of Gaighata W/S scheme within the jurisdiction of Habra Sub-Division under Barasat Division, P.H.E. Dte. ORD/002978/2021-2022 494/HAB 02/12/2021 30 M/S SANKAR ENTERPRISE. 2.95 2.90 1
1837 Barasat Division Repairing & renovation of Pump House No. - 1 of Sadpur W/S scheme within the jurisdiction of Habra Sub-Division under Barasat Division, P.H.E. Dte. ORD/002979/2021-2022 500/HAB 02/12/2021 30 M/S SUKANTA ENTERPRISE. 0.74 0.70 1
1838 Barasat Division Repairing & renovation of Pump House No. ? 1 & 2 of Bergum W/S scheme within the jurisdiction of Habra Sub-Division under Barasat Division, P.H.E. Dte. ORD/002980/2021-2022 502/HAB 03/12/2021 30 AREOCON. 2.07 2.06 1
1839 Barasat Division Repairing & renovation of Pump House No. ? 1 & 2 of Janaphul W/S scheme within the jurisdiction of Habra Sub-Division under Barasat Division, P.H.E. Dte. ORD/002981/2021-2022 503/HAB 03/12/2021 30 AREOCON. 1.30 1.24 1
1840 Barasat Division Repairing & renovation of Pump House No. ¿ 3 of Gaighata W/S scheme within the jurisdiction of Habra Sub-Division under Barasat Division, P.H.E. Dte. ORD/002982/2021-2022 511/HAB 10/12/2021 30 M/S SANKAR ENTERPRISE. 1.47 1.45 1
1841 Barasat Division Repairing & renovation of Pump House No. 1 & 2 of Khosdelpur& adj. mouzas W/S scheme within the jurisdiction of Habra Sub-Division under Barasat Division, P.H.E. Dte. ORD/002983/2021-2022 513/HAB 10/12/2021 30 M/S SUKANTA ENTERPRISE. 1.56 1.50 1
1842 Barasat Division Repairing & renovation of Pump House No. ? 1 & 2 of Kamarpur& adj. mouzas W/S scheme within the jurisdiction of Habra Sub-Division under Barasat Division, P.H.E. Dte. ORD/002984/2021-2022 512/HAB 10/12/2021 30 M/S LATIKA CONSTRUCTION. 1.40 1.32 1
1843 Barasat Division Repairing & renovation of Pump House No. ¿ 1 & 2 of Talsa& adj. mouzas W/S scheme within the jurisdiction of Habra Sub-Division under BarasatDivision, P.H.E. Dte. ORD/002985/2021-2022 515/HAB 10/12/2021 30 DAS & CO. 1.55 1.51 1
1844 Barasat Division Repairing & renovation of Pump House No. - 1 & 2 of Talsa W/S scheme within the jurisdiction of Habra Sub-Division under Barasat Division, P.H.E. Dte. ORD/002986/2021-2022 498/HAB 02/12/2021 30 TALUKDER & CO. 2.16 0.00 1
1845 Barasat Division Repairing of Pump House No 1 at Rajandrapur Water Supply Scheme under Basirhat Sub-Division P.H.E. Dte. ORD/002987/2021-2022 1237/BHT 16/09/2021 20 PROBAHA ENGINEER'S CO-OP-SOCIETY LTD. 0.66 0.45 1
1846 Barasat Division Acceptance cum work order for Survey, Design Drawing & DPR Preparation for NEW PWSS (GHIPUKURIA Water Supply Scheme) in MINAKHAN BLOCK under Barasat Division, PHE Dte. (PART-B) ORD/002990/2021-2022 275/HSD 09/02/2022 15 SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. 0.83 0.00 1
1847 Barasat Division Acceptance cum work order for Survey, Design Drawing & DPR Preparation for NEW PWSS (PIPULDAHA Water Supply Scheme) in MINAKHAN BLOCK under Barasat Division, PHE Dte. ORD/002991/2021-2022 307/HSD 15/02/2022 15 SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. 4.26 0.00 1
1848 Barasat Division Acceptance cum work order for Survey, Design Drawing & DPR Preparation for NEW PWSS (KACHURHULA Z-II Water Supply Scheme) in MINAKHAN BLOCK under Barasat Division, PHE Dte. ORD/002994/2021-2022 281/HSD 09/02/2022 15 SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. 3.09 0.00 1
1849 Barasat Division Acceptance cum work order for Survey, Design Drawing & DPR Preparation for NEW PWSS (KACHURHULA Z-I Water Supply Scheme) in MINAKHAN BLOCK under Barasat Division, PHE Dte ORD/002995/2021-2022 280/HSD 09/02/2022 15 SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. 4.50 0.00 1
1850 Barasat Division Acceptance cum work order for Survey, Design Drawing & DPR Preparation for NEW PWSS (JHIKRA Water Supply Scheme) in MINAKHAN BLOCK under Barasat Division, PHE Dte. (PART-B) ORD/002996/2021-2022 279/HSD 09/02/2022 15 TIYAS CONSULTANCY AND INFRASTRUCTURE PVT.LTD. 1.46 0.00 1
1851 Barasat Division Acceptance cum work order for Survey, Design Drawing & DPR Preparation for NEW PWSS (JHIKRA Water Supply Scheme) in MINAKHAN BLOCK under Barasat Division, PHE Dte. (PART-A) ORD/002997/2021-2022 278/HSD 09/02/2022 15 SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. 4.83 0.00 1
1852 Barasat Division Repairing & Renovation 2(Two) nos of Pump House and allied works of Chowberia water supply scheme under Bongaon Sub-Division, P.H.E.Dte. ORD/003000/2021-2022 532/Bon 03/11/2021 21 A.D.ENTERPRISE. 2.52 2.51 1
1853 Barasat Division Acceptance cum Work Order for Providing Functional Household Tap Connection (FHTC) in connection with Jal Jeevan Mission (JJM and Jal Swapna) under command area of Gadpukuria Water Supply Scheme at Bagdah Block under Barasat Division, PHE Dte. (Phase-I). ORD/003014/2021-2022 1356/BD. 03/08/2021 90 ORIENT CONSTRUCTION. 131.31 0.00 1
1854 Barasat Division Hiring 1(One) No. Diesel Luxury Car on Daily basis. (for 12 months from 01.03.2022 to 28.02.2023 w.e.f. 01.12.2022) for the office use of the Assistant Engineer, Barasat Sub Division, P.H.E. Dte. ORD/003025/2021-2022 193/BSD 25/02/2022 365 MADHAB CHANDRA DAS 1.25 0.76 0
1855 Barasat Division Formal Work order for Laying of DI rising main and DI/UPVC distribution pipe line and Construction of 900 cum capacity 20 mtr. staging height R.C.C. Over Head Water Reservoir as per Departmental design, drawing and specification including bored pile & pile cap at Chunchura & Rajbari water supply scheme, Sandeshkhali-I block under Hasnabad Sub-Division,PHE Dte. under Barasat Division, PHE Dte. ORD/003031/2021-2022 767/Bd 16/03/2022 12 S. GHOSH & ASSOCIATES PVT. LTD. 563.09 352.17 100
1856 Barasat Division Acceptance cum work order for Restoration of different diameter existing pipe lines by laying UPVC pipes and allied works of Sadpur W/S scheme due to up gradation of different roads within the jurisdiction of Habra Sub-Division, under Barasat Division, P.H.E. Dte. ORD/003033/2021-2022 2047//BD 21/09/2021 30 MONDAL ENTERPRISE. (BARASAT) 26.59 11.14 100
1857 Barasat Division Continuation order for one motor launch (M.V. JOYMAKALI) on daily hire basis for use of Hasnabad Sub-Division, P.H.E. Dte. Period : 01.03.22 to 31.08.22=184 days. ORD/003034/2021-2022 386/HSD 28/02/2022 184 SUSMITA MANDAL. 2.74 8.87 100
1858 Barasat Division Route Survey, Design Drawing & DPR Preparation for BANGLANI Water Supply Scheme in Swarupnagar Block under Barasat Division, PHE Dte. ORD/003053/2021-2022 456/BHT 22/03/2022 15 SRIJAN ECOLOGICAL UPLIFTMENT PVT.LTD. 4.95 4.95 100
1859 Barasat Division Special repairing work in connection with Augmentation Work at Gangrapota W/S Scheme under Bongaon Block within the jurisdiction of Bongaon Sub-Division under, Barasat Division, P.H.E. Dte. ORD/003114/2024-2025 376/Bon 13/03/2025 15 VAI ENTERPRISE. 0.57 0.00 100
1860 Barasat Division Material Requisition To Resource Division RTOR000001/2021-2022 2240/BD 24/11/2021 0 Resource Division 10.26 0.00 0
1861 Barasat Division Material Requisition To Resource Division RTOR000001/2023-2024 1062/BD 04/04/2023 0 Resource Division 53.92 0.00 0
1862 Barasat Division Material Requisition To Resource Division RTOR000002/2021-2022 2238/BD 24/11/2021 0 Resource Division 10.26 0.00 0
1863 Barasat Division Material Requisition To Resource Division RTOR000002/2023-2024 1100/BD 06/04/2023 0 Resource Division 11.42 0.00 0
1864 Barasat Division Material Requisition To Resource Division RTOR000003/2021-2022 2239/BD 24/11/2021 0 Resource Division 10.26 0.00 0
1865 Barasat Division Material Requisition To Resource Division RTOR000003/2023-2024 1101/BD 06/04/2023 0 Resource Division 92.65 0.00 0
1866 Barasat Division Material Requisition To Resource Division RTOR000004/2023-2024 1245/BD 25/04/2023 0 Resource Division 5.09 0.00 0
1867 Barasat Division Material Requisition To Resource Division RTOR000004/2024-2025 2181/BD 02/08/2024 0 Resource Division 13.02 0.00 0
1868 Barasat Division Material Requisition To Resource Division RTOR000005/2021-2022 2242/BD 24/11/2021 0 Resource Division 10.26 0.00 0
1869 Barasat Division Material Requisition To Resource Division RTOR000005/2022-2023 1369/BD 13/05/2022 0 Resource Division 26.76 0.00 0
1870 Barasat Division Material Requisition To Resource Division RTOR000005/2023-2024 1240/BD 25/04/2023 0 Resource Division 13.72 0.00 0
1871 Barasat Division Material Requisition To Resource Division RTOR000005/2024-2025 2181/BD 02/08/2024 0 Resource Division 17.29 0.00 0
1872 Barasat Division Material Requisition To Resource Division RTOR000006/2022-2023 1367/BD 13/05/2022 0 Resource Division 19.79 0.00 0
1873 Barasat Division Material Requisition To Resource Division RTOR000006/2023-2024 1246/BD 25/04/2023 0 Resource Division 113.03 0.00 0
1874 Barasat Division Material Requisition To Resource Division RTOR000007/2022-2023 1362/BD 13/05/2022 0 Resource Division 20.47 0.00 0
1875 Barasat Division Material Requisition To Resource Division RTOR000007/2023-2024 1252/BD 25/04/2023 0 Resource Division 8.28 0.00 0
1876 Barasat Division Material Requisition To Resource Division RTOR000008/2022-2023 1361/BD 13/05/2022 0 Resource Division 23.36 0.00 0
1877 Barasat Division Material Requisition To Resource Division RTOR000008/2023-2024 1250/BD 25/04/2023 0 Resource Division 17.73 0.00 0
1878 Barasat Division Material Requisition To Resource Division RTOR000008/2024-2025 3442/BD 06/12/2024 0 Resource Division 38.05 0.00 0
1879 Barasat Division Material Requisition To Resource Division RTOR000009/2022-2023 1366/BD 13/05/2022 0 Resource Division 8.83 0.00 0
1880 Barasat Division Material Requisition To Resource Division RTOR000009/2023-2024 1249/BD 25/04/2023 0 Resource Division 114.40 0.00 0
1881 Barasat Division Material Requisition To Resource Division RTOR000010/2022-2023 1365/BD 13/05/2022 0 Resource Division 18.73 0.00 0
1882 Barasat Division Material Requisition To Resource Division RTOR000010/2023-2024 1261/BD 25/04/2023 0 Resource Division 17.18 0.00 0
1883 Barasat Division Material Requisition To Resource Division RTOR000010/2024-2025 3478/BD 10/12/2024 0 Resource Division 34.89 0.00 0
1884 Barasat Division Material Requisition To Resource Division RTOR000011/2022-2023 1364/BD 13/05/2022 0 Resource Division 33.31 0.00 0
1885 Barasat Division Material Requisition To Resource Division RTOR000011/2023-2024 1244/BD 25/04/2023 0 Resource Division 158.92 0.00 0
1886 Barasat Division Material Requisition To Resource Division RTOR000011/2024-2025 3477/BD 10/12/2024 0 Resource Division 25.32 0.00 0
1887 Barasat Division Material Requisition To Resource Division RTOR000012/2021-2022 249/BD 27/01/2022 0 Resource Division 1.99 0.00 0
1888 Barasat Division Material Requisition To Resource Division RTOR000012/2022-2023 1360/BD 13/05/2022 0 Resource Division 11.96 0.00 0
1889 Barasat Division Material Requisition To Resource Division RTOR000012/2023-2024 1243/BD 25/04/2023 0 Resource Division 15.85 0.00 0
1890 Barasat Division Material Requisition To Resource Division RTOR000012/2024-2025 3480/BD 10/12/2024 0 Resource Division 99.05 0.00 0
1891 Barasat Division Material Requisition To Resource Division RTOR000013/2021-2022 251/BD 27/01/2022 0 Resource Division 1.99 0.00 0
1892 Barasat Division Material Requisition To Resource Division RTOR000013/2022-2023 1368/BD 13/05/2022 0 Resource Division 46.36 0.00 0
1893 Barasat Division Material Requisition To Resource Division RTOR000013/2023-2024 1262/BD 25/04/2023 0 Resource Division 190.25 0.00 0
1894 Barasat Division Material Requisition To Resource Division RTOR000013/2024-2025 3479/BD 10/12/2024 0 Resource Division 77.88 0.00 0
1895 Barasat Division Material Requisition To Resource Division RTOR000014/2021-2022 252/BD 27/01/2022 0 Resource Division 1.99 0.00 0
1896 Barasat Division Material Requisition To Resource Division RTOR000014/2022-2023 1363/BD 13/05/2022 0 Resource Division 10.74 0.00 0
1897 Barasat Division Material Requisition To Resource Division RTOR000014/2023-2024 1260/BD 25/04/2023 0 Resource Division 381.58 0.00 0
1898 Barasat Division Material Requisition To Resource Division RTOR000015/2021-2022 250/BD 27/01/2022 0 Resource Division 1.99 0.00 0
1899 Barasat Division Material Requisition To Resource Division RTOR000015/2022-2023 1438/BD 23/05/2022 0 Resource Division 9.71 0.00 0
1900 Barasat Division Material Requisition To Resource Division RTOR000015/2023-2024 1241/BD 25/04/2023 0 Resource Division 145.39 0.00 0
1901 Barasat Division Material Requisition To Resource Division RTOR000016/2022-2023 1674/BD 13/06/2022 0 Resource Division 20.09 0.00 0
1902 Barasat Division Material Requisition To Resource Division RTOR000016/2023-2024 1263/BD 25/04/2023 0 Resource Division 52.64 0.00 0
1903 Barasat Division Material Requisition To Resource Division RTOR000017/2022-2023 1672/BD 13/06/2022 0 Resource Division 19.79 0.00 0
1904 Barasat Division Material Requisition To Resource Division RTOR000017/2023-2024 1239/BD 25/04/2023 0 Resource Division 69.20 0.00 0
1905 Barasat Division Material Requisition To Resource Division RTOR000018/2022-2023 1670/BD 13/06/2022 0 Resource Division 21.96 0.00 0
1906 Barasat Division Material Requisition To Resource Division RTOR000018/2023-2024 1238/BD 25/04/2023 0 Resource Division 146.14 0.00 0
1907 Barasat Division Material Requisition To Resource Division RTOR000019/2022-2023 1671/BD 13/06/2022 0 Resource Division 8.71 0.00 0
1908 Barasat Division Material Requisition To Resource Division RTOR000019/2023-2024 1237/BD 25/04/2023 0 Resource Division 141.41 0.00 0
1909 Barasat Division Material Requisition To Resource Division RTOR000020/2022-2023 1673/BD 13/06/2022 0 Resource Division 17.77 0.00 0
1910 Barasat Division Material Requisition To Resource Division RTOR000020/2023-2024 1242/BD 25/04/2023 0 Resource Division 95.52 0.00 0
1911 Barasat Division Material Requisition To Resource Division RTOR000021/2022-2023 1675/BD 13/06/2022 0 Resource Division 16.72 0.00 0
1912 Barasat Division Material Requisition To Resource Division RTOR000021/2023-2024 1236/BD 25/04/2023 0 Resource Division 4.59 0.00 0
1913 Barasat Division Material Requisition To Resource Division RTOR000022/2022-2023 1669/BD 13/06/2022 0 Resource Division 14.85 0.00 0
1914 Barasat Division Material Requisition To Resource Division RTOR000022/2023-2024 1253/BD 25/04/2023 0 Resource Division 86.25 0.00 0
1915 Barasat Division Material Requisition To Resource Division RTOR000023/2022-2023 1675/BD 13/06/2022 0 Resource Division 76.64 0.00 0
1916 Barasat Division Material Requisition To Resource Division RTOR000023/2023-2024 1254/BD 25/04/2023 0 Resource Division 260.28 0.00 0
1917 Barasat Division Material Requisition To Resource Division RTOR000024/2023-2024 1251/BD 25/04/2023 0 Resource Division 139.05 0.00 0
1918 Barasat Division Material Requisition To Resource Division RTOR000025/2023-2024 1248/BD 25/04/2023 0 Resource Division 520.48 0.00 0
1919 Barasat Division Material Requisition To Resource Division RTOR000026/2022-2023 1828/BD 29/06/2022 0 Resource Division 195.63 0.00 0
1920 Barasat Division Material Requisition To Resource Division RTOR000026/2023-2024 1247/BD 25/04/2023 0 Resource Division 49.35 0.00 0
1921 Barasat Division Material Requisition To Resource Division RTOR000028/2022-2023 2305/BD 03/08/2022 0 Resource Division 4.84 0.00 0
1922 Barasat Division Material Requisition To Resource Division RTOR000028/2023-2024 1266/BD 25/04/2023 0 Resource Division 158.32 0.00 0
1923 Barasat Division Material Requisition To Resource Division RTOR000029/2022-2023 2309/BD 03/08/2022 0 Resource Division 11.42 0.00 0
1924 Barasat Division Material Requisition To Resource Division RTOR000029/2023-2024 1276/BD 25/04/2023 0 Resource Division 208.17 0.00 0
1925 Barasat Division Material Requisition To Resource Division RTOR000030/2021-2022 941/BD 28/03/2022 0 Resource Division 150.53 0.00 0
1926 Barasat Division Material Requisition To Resource Division RTOR000030/2022-2023 2308/BD 03/08/2022 0 Resource Division 2.43 0.00 0
1927 Barasat Division Material Requisition To Resource Division RTOR000030/2023-2024 1280/BD 25/04/2023 0 Resource Division 45.73 0.00 0
1928 Barasat Division Material Requisition To Resource Division RTOR000031/2021-2022 961/BD 29/03/2022 0 Resource Division 115.45 0.00 0
1929 Barasat Division Material Requisition To Resource Division RTOR000031/2022-2023 2306/BD 03/08/2022 0 Resource Division 2.30 0.00 0
1930 Barasat Division Material Requisition To Resource Division RTOR000031/2023-2024 1281/BD 25/04/2023 0 Resource Division 86.51 0.00 0
1931 Barasat Division Material Requisition To Resource Division RTOR000032/2022-2023 2307/BD 03/08/2022 0 Resource Division 12.12 0.00 0
1932 Barasat Division Material Requisition To Resource Division RTOR000032/2023-2024 1287/BD 25/04/2023 0 Resource Division 73.47 0.00 0
1933 Barasat Division Material Requisition To Resource Division RTOR000033/2022-2023 2374/BD 12/08/2022 0 Resource Division 60.89 0.00 0
1934 Barasat Division Material Requisition To Resource Division RTOR000033/2023-2024 1282/BD 25/04/2023 0 Resource Division 13.18 0.00 0
1935 Barasat Division Material Requisition To Resource Division RTOR000034/2023-2024 1289/BD 25/04/2023 0 Resource Division 76.38 0.00 0
1936 Barasat Division Material Requisition To Resource Division RTOR000035/2022-2023 2474/BD 24/08/2022 0 Resource Division 2.46 0.00 0
1937 Barasat Division Material Requisition To Resource Division RTOR000035/2023-2024 1274/BD 25/04/2023 0 Resource Division 23.58 0.00 0
1938 Barasat Division Material Requisition To Resource Division RTOR000036/2022-2023 2475/BD 24/08/2022 0 Resource Division 4.91 0.00 0
1939 Barasat Division Material Requisition To Resource Division RTOR000036/2023-2024 1267/BD 25/04/2023 0 Resource Division 99.41 0.00 0
1940 Barasat Division Material Requisition To Resource Division RTOR000037/2022-2023 2469/BD 24/08/2022 0 Resource Division 15.08 0.00 0
1941 Barasat Division Material Requisition To Resource Division RTOR000037/2023-2024 1283/BD 25/04/2023 0 Resource Division 36.84 0.00 0
1942 Barasat Division Material Requisition To Resource Division RTOR000038/2022-2023 2470/BD 24/08/2022 0 Resource Division 8.30 0.00 0
1943 Barasat Division Material Requisition To Resource Division RTOR000039/2022-2023 2471/BD 24/08/2022 0 Resource Division 7.56 0.00 0
1944 Barasat Division Material Requisition To Resource Division RTOR000040/2022-2023 2472/BD 24/08/2022 0 Resource Division 8.92 0.00 0
1945 Barasat Division Material Requisition To Resource Division RTOR000040/2023-2024 1284/BD 25/04/2023 0 Resource Division 211.19 0.00 0
1946 Barasat Division Material Requisition To Resource Division RTOR000041/2022-2023 2473/BD 24/08/2022 0 Resource Division 13.91 0.00 0
1947 Barasat Division Material Requisition To Resource Division RTOR000041/2023-2024 1269/BD 25/04/2023 0 Resource Division 32.07 0.00 0
1948 Barasat Division Material Requisition To Resource Division RTOR000042/2022-2023 2515/BD 25/08/2022 0 Resource Division 22.72 0.00 0
1949 Barasat Division Material Requisition To Resource Division RTOR000042/2023-2024 1270/BD 25/04/2023 0 Resource Division 37.17 0.00 0
1950 Barasat Division Material Requisition To Resource Division RTOR000043/2022-2023 2516/BD 25/08/2022 0 Resource Division 7.71 0.00 0
1951 Barasat Division Material Requisition To Resource Division RTOR000043/2023-2024 1278/BD 25/04/2023 0 Resource Division 197.95 0.00 0
1952 Barasat Division Material Requisition To Resource Division RTOR000044/2022-2023 2518/BD 25/08/2022 0 Resource Division 21.54 0.00 0
1953 Barasat Division Material Requisition To Resource Division RTOR000044/2023-2024 1288/BD 25/04/2023 0 Resource Division 48.13 0.00 0
1954 Barasat Division Material Requisition To Resource Division RTOR000045/2022-2023 2517/BD 25/08/2022 0 Resource Division 6.75 0.00 0
1955 Barasat Division Material Requisition To Resource Division RTOR000045/2023-2024 1271/BD 25/04/2023 0 Resource Division 149.36 0.00 0
1956 Barasat Division Material Requisition To Resource Division RTOR000046/2022-2023 2576/BD 31/08/2022 0 Resource Division 6.15 0.00 0
1957 Barasat Division Material Requisition To Resource Division RTOR000046/2023-2024 1272/BD 25/04/2023 0 Resource Division 5.86 0.00 0
1958 Barasat Division Material Requisition To Resource Division RTOR000047/2022-2023 2578/BD 31/08/2022 0 Resource Division 6.15 0.00 0
1959 Barasat Division Material Requisition To Resource Division RTOR000047/2023-2024 1273/BD 25/04/2023 0 Resource Division 94.49 0.00 0
1960 Barasat Division Material Requisition To Resource Division RTOR000048/2022-2023 2577/BD 31/08/2022 0 Resource Division 21.53 0.00 0
1961 Barasat Division Material Requisition To Resource Division RTOR000048/2023-2024 1279/BD 25/04/2023 0 Resource Division 66.17 0.00 0
1962 Barasat Division Material Requisition To Resource Division RTOR000049/2022-2023 2861/BD 21/09/2022 0 Resource Division 0.00 0.00 0
1963 Barasat Division Material Requisition To Resource Division RTOR000050/2022-2023 2868/BD 21/09/2022 0 Resource Division 2.14 0.00 0
1964 Barasat Division Material Requisition To Resource Division RTOR000050/2023-2024 1285/BD 25/04/2023 0 Resource Division 46.16 0.00 0
1965 Barasat Division Material Requisition To Resource Division RTOR000051/2022-2023 2858/BD 21/09/2022 0 Resource Division 1.85 0.00 0
1966 Barasat Division Material Requisition To Resource Division RTOR000052/2022-2023 2866/BD 21/09/2022 0 Resource Division 2.83 0.00 0
1967 Barasat Division Material Requisition To Resource Division RTOR000053/2022-2023 2860/BD 21/09/2022 0 Resource Division 3.08 0.00 0
1968 Barasat Division Material Requisition To Resource Division RTOR000053/2023-2024 1554/BD 23/05/2023 0 Resource Division 13.55 0.00 0
1969 Barasat Division Material Requisition To Resource Division RTOR000054/2022-2023 2865/BD 21/09/2022 0 Resource Division 1.23 0.00 0
1970 Barasat Division Material Requisition To Resource Division RTOR000054/2023-2024 1555/BD 23/05/2023 0 Resource Division 7.44 0.00 0
1971 Barasat Division Material Requisition To Resource Division RTOR000055/2022-2023 2862/BD 21/09/2022 0 Resource Division 36.20 0.00 0
1972 Barasat Division Material Requisition To Resource Division RTOR000055/2023-2024 1556/BD 23/05/2023 0 Resource Division 0.92 0.00 0
1973 Barasat Division Material Requisition To Resource Division RTOR000056/2022-2023 2863/BD 21/09/2022 0 Resource Division 3.08 0.00 0
1974 Barasat Division Material Requisition To Resource Division RTOR000056/2023-2024 1557/BD 23/05/2023 0 Resource Division 3.08 0.00 0
1975 Barasat Division Material Requisition To Resource Division RTOR000057/2022-2023 2864/BD 21/09/2022 0 Resource Division 2.16 0.00 0
1976 Barasat Division Material Requisition To Resource Division RTOR000057/2023-2024 1558/BD 23/05/2023 0 Resource Division 1.85 0.00 0
1977 Barasat Division Material Requisition To Resource Division RTOR000058/2022-2023 2859/BD 21/09/2022 0 Resource Division 27.73 0.00 0
1978 Barasat Division Material Requisition To Resource Division RTOR000058/2023-2024 1560/BD 23/05/2023 0 Resource Division 1.23 0.00 0
1979 Barasat Division Material Requisition To Resource Division RTOR000059/2022-2023 2866/BD 21/09/2022 0 Resource Division 0.10 0.00 0
1980 Barasat Division Material Requisition To Resource Division RTOR000059/2023-2024 1559/BD 23/05/2023 0 Resource Division 7.62 0.00 0
1981 Barasat Division Material Requisition To Resource Division RTOR000060/2023-2024 1625/BD 01/06/2023 0 Resource Division 9.22 0.00 0
1982 Barasat Division Material Requisition To Resource Division RTOR000061/2023-2024 1633/BD 01/06/2023 0 Resource Division 10.10 0.00 0
1983 Barasat Division Material Requisition To Resource Division RTOR000062/2023-2024 1626/BD 01/06/2023 0 Resource Division 44.17 0.00 0
1984 Barasat Division Material Requisition To Resource Division RTOR000063/2022-2023 2338/BD 26/09/2022 0 Resource Division 61.50 0.00 0
1985 Barasat Division Material Requisition To Resource Division RTOR000063/2023-2024 1632/BD 01/06/2023 0 Resource Division 48.44 0.00 0
1986 Barasat Division Material Requisition To Resource Division RTOR000064/2022-2023 2342/BD 26/09/2022 0 Resource Division 24.12 0.00 0
1987 Barasat Division Material Requisition To Resource Division RTOR000064/2023-2024 1627/BD 01/06/2023 0 Resource Division 19.43 0.00 0
1988 Barasat Division Material Requisition To Resource Division RTOR000065/2022-2023 2341/BD 26/09/2022 0 Resource Division 2.93 0.00 0
1989 Barasat Division Material Requisition To Resource Division RTOR000065/2023-2024 1628/BD 01/06/2023 0 Resource Division 9.42 0.00 0
1990 Barasat Division Material Requisition To Resource Division RTOR000066/2022-2023 2339/BD 26/09/2022 0 Resource Division 61.51 0.00 0
1991 Barasat Division Material Requisition To Resource Division RTOR000066/2023-2024 1631/BD 01/06/2023 0 Resource Division 43.69 0.00 0
1992 Barasat Division Material Requisition To Resource Division RTOR000067/2022-2023 2340/BD 26/09/2022 0 Resource Division 18.30 0.00 0
1993 Barasat Division Material Requisition To Resource Division RTOR000067/2023-2024 1629/BD 01/06/2023 0 Resource Division 71.08 0.00 0
1994 Barasat Division Material Requisition To Resource Division RTOR000068/2022-2023 2986/BD 29/09/2022 0 Resource Division 0.06 0.00 0
1995 Barasat Division Material Requisition To Resource Division RTOR000069/2022-2023 2992/BD 29/09/2022 0 Resource Division 0.02 0.00 0
1996 Barasat Division Material Requisition To Resource Division RTOR000069/2023-2024 1645/BD 02/06/2023 0 Resource Division 10.32 0.00 0
1997 Barasat Division Material Requisition To Resource Division RTOR000070/2022-2023 2993/BD 29/09/2022 0 Resource Division 0.08 0.00 0
1998 Barasat Division Material Requisition To Resource Division RTOR000070/2023-2024 1647/BD 02/06/2023 0 Resource Division 13.76 0.00 0
1999 Barasat Division Material Requisition To Resource Division RTOR000071/2022-2023 2984/BD 29/09/2022 0 Resource Division 0.02 0.00 0
2000 Barasat Division Material Requisition To Resource Division RTOR000071/2023-2024 1646/BD 02/06/2023 0 Resource Division 13.76 0.00 0
2001 Barasat Division Material Requisition To Resource Division RTOR000072/2022-2023 2985/BD 29/09/2022 0 Resource Division 7.39 0.00 0
2002 Barasat Division Material Requisition To Resource Division RTOR000072/2023-2024 1659/BD 05/06/2023 0 Resource Division 10.04 0.00 0
2003 Barasat Division Material Requisition To Resource Division RTOR000073/2022-2023 2990/BD 29/09/2022 0 Resource Division 0.02 0.00 0
2004 Barasat Division Material Requisition To Resource Division RTOR000073/2023-2024 1673/BD 06/06/2023 0 Resource Division 46.16 0.00 0
2005 Barasat Division Material Requisition To Resource Division RTOR000074/2022-2023 2987/BD 29/09/2022 0 Resource Division 0.01 0.00 0
2006 Barasat Division Material Requisition To Resource Division RTOR000074/2023-2024 1671/BD 06/06/2023 0 Resource Division 9.76 0.00 0
2007 Barasat Division Material Requisition To Resource Division RTOR000075/2022-2023 2989/BD 29/09/2022 0 Resource Division 7.39 0.00 0
2008 Barasat Division Material Requisition To Resource Division RTOR000075/2023-2024 1672/BD 06/06/2023 0 Resource Division 15.20 0.00 0
2009 Barasat Division Material Requisition To Resource Division RTOR000076/2022-2023 2988/BD 29/09/2022 0 Resource Division 0.01 0.00 0
2010 Barasat Division Material Requisition To Resource Division RTOR000076/2023-2024 1674/BD 06/06/2023 0 Resource Division 14.70 0.00 0
2011 Barasat Division Material Requisition To Resource Division RTOR000077/2022-2023 2991/BD 29/09/2022 0 Resource Division 0.20 0.00 0
2012 Barasat Division Material Requisition To Resource Division RTOR000077/2023-2024 1675/BD 06/06/2023 0 Resource Division 7.07 0.00 0
2013 Barasat Division Material Requisition To Resource Division RTOR000078/2022-2023 3105/BD 18/10/2022 0 Resource Division 0.02 0.00 0
2014 Barasat Division Material Requisition To Resource Division RTOR000078/2023-2024 1676/BD 06/06/2023 0 Resource Division 11.83 0.00 0
2015 Barasat Division Material Requisition To Resource Division RTOR000079/2022-2023 3106/BD 18/10/2022 0 Resource Division 14.06 0.00 0
2016 Barasat Division Material Requisition To Resource Division RTOR000079/2023-2024 1816/BD 19/06/2023 0 Resource Division 40.04 0.00 0
2017 Barasat Division Material Requisition To Resource Division RTOR000080/2022-2023 3106/BD 18/10/2022 0 Resource Division 8.11 0.00 0
2018 Barasat Division Material Requisition To Resource Division RTOR000080/2023-2024 1809/BD 19/06/2023 0 Resource Division 14.78 0.00 0
2019 Barasat Division Material Requisition To Resource Division RTOR000081/2022-2023 3109/BD 18/10/2022 0 Resource Division 17.80 0.00 0
2020 Barasat Division Material Requisition To Resource Division RTOR000081/2023-2024 1810/BD 19/06/2023 0 Resource Division 13.49 0.00 0
2021 Barasat Division Material Requisition To Resource Division RTOR000082/2022-2023 3107/BD 18/10/2022 0 Resource Division 9.23 0.00 0
2022 Barasat Division Material Requisition To Resource Division RTOR000082/2023-2024 1811/BD 19/06/2023 0 Resource Division 3.15 0.00 0
2023 Barasat Division Material Requisition To Resource Division RTOR000083/2023-2024 1812/BD 19/06/2023 0 Resource Division 16.51 0.00 0
2024 Barasat Division Material Requisition To Resource Division RTOR000084/2023-2024 1817/BD 19/06/2023 0 Resource Division 52.67 0.00 0
2025 Barasat Division Material Requisition To Resource Division RTOR000085/2022-2023 3365/BD 17/11/2022 0 Resource Division 3.05 0.00 0
2026 Barasat Division Material Requisition To Resource Division RTOR000085/2023-2024 1813/BD 19/06/2023 0 Resource Division 2.59 0.00 0
2027 Barasat Division Material Requisition To Resource Division RTOR000086/2022-2023 3363/BD 17/11/2022 0 Resource Division 3.53 0.00 0
2028 Barasat Division Material Requisition To Resource Division RTOR000086/2023-2024 1818/BD 19/06/2023 0 Resource Division 16.39 0.00 0
2029 Barasat Division Material Requisition To Resource Division RTOR000087/2023-2024 1819/BD 19/06/2023 0 Resource Division 21.78 0.00 0
2030 Barasat Division Material Requisition To Resource Division RTOR000088/2023-2024 1821/BD 19/06/2023 0 Resource Division 16.88 0.00 0
2031 Barasat Division Material Requisition To Resource Division RTOR000089/2022-2023 3410/BD 22/11/2022 0 Resource Division 7.90 0.00 0
2032 Barasat Division Material Requisition To Resource Division RTOR000089/2023-2024 1814/BD 19/06/2023 0 Resource Division 30.80 0.00 0
2033 Barasat Division Material Requisition To Resource Division RTOR000090/2022-2023 3421/BD 23/11/2022 0 Resource Division 62.56 0.00 0
2034 Barasat Division Material Requisition To Resource Division RTOR000090/2023-2024 1815/BD 19/06/2023 0 Resource Division 18.48 0.00 0
2035 Barasat Division Material Requisition To Resource Division RTOR000091/2022-2023 3659/BD 13/12/2022 0 Resource Division 21.27 0.00 0
2036 Barasat Division Material Requisition To Resource Division RTOR000091/2023-2024 1820/BD 19/06/2023 0 Resource Division 20.33 0.00 0
2037 Barasat Division Material Requisition To Resource Division RTOR000092/2022-2023 3661/BD 13/12/2022 0 Resource Division 8.27 0.00 0
2038 Barasat Division Material Requisition To Resource Division RTOR000092/2023-2024 1860/BD 23/06/2023 0 Resource Division 5.56 0.00 0
2039 Barasat Division Material Requisition To Resource Division RTOR000093/2022-2023 3653/BD 13/12/2022 0 Resource Division 15.03 0.00 0
2040 Barasat Division Material Requisition To Resource Division RTOR000093/2023-2024 1861/BD 23/06/2023 0 Resource Division 15.65 0.00 0
2041 Barasat Division Material Requisition To Resource Division RTOR000094/2022-2023 3662/BD 13/12/2022 0 Resource Division 14.00 0.00 0
2042 Barasat Division Material Requisition To Resource Division RTOR000094/2023-2024 1864/BD 23/06/2023 0 Resource Division 31.18 0.00 0
2043 Barasat Division Material Requisition To Resource Division RTOR000095/2022-2023 3654/BD 13/12/2022 0 Resource Division 40.85 0.00 0
2044 Barasat Division Material Requisition To Resource Division RTOR000095/2023-2024 1862/BD 23/06/2023 0 Resource Division 12.63 0.00 0
2045 Barasat Division Material Requisition To Resource Division RTOR000096/2022-2023 3663/BD 13/12/2022 0 Resource Division 7.98 0.00 0
2046 Barasat Division Material Requisition To Resource Division RTOR000096/2023-2024 1866/BD 23/06/2023 0 Resource Division 4.65 0.00 0
2047 Barasat Division Material Requisition To Resource Division RTOR000097/2022-2023 3666/BD 13/12/2022 0 Resource Division 7.57 0.00 0
2048 Barasat Division Material Requisition To Resource Division RTOR000097/2023-2024 1863/BD 23/06/2023 0 Resource Division 14.21 0.00 0
2049 Barasat Division Material Requisition To Resource Division RTOR000098/2022-2023 3655/BD 13/12/2022 0 Resource Division 20.38 0.00 0
2050 Barasat Division Material Requisition To Resource Division RTOR000098/2023-2024 1865/BD 23/06/2023 0 Resource Division 7.45 0.00 0
2051 Barasat Division Material Requisition To Resource Division RTOR000099/2022-2023 3656/BD 13/12/2022 0 Resource Division 12.62 0.00 0
2052 Barasat Division Material Requisition To Resource Division RTOR000100/2022-2023 3657/BD 13/12/2022 0 Resource Division 31.17 0.00 0
2053 Barasat Division Material Requisition To Resource Division RTOR000100/2023-2024 1995/BD 10/07/2023 0 Resource Division 126.15 0.00 0
2054 Barasat Division Material Requisition To Resource Division RTOR000101/2022-2023 3660/BD 13/12/2022 0 Resource Division 3.12 0.00 0
2055 Barasat Division Material Requisition To Resource Division RTOR000102/2022-2023 3664/BD 13/12/2022 0 Resource Division 2.09 0.00 0
2056 Barasat Division Material Requisition To Resource Division RTOR000102/2023-2024 2093/BD 18/07/2023 0 Resource Division 12.63 0.00 0
2057 Barasat Division Material Requisition To Resource Division RTOR000103/2022-2023 3658/BD 13/12/2022 0 Resource Division 15.09 0.00 0
2058 Barasat Division Material Requisition To Resource Division RTOR000103/2023-2024 3093/BD 10/10/2023 0 Resource Division 24.61 0.00 0
2059 Barasat Division Material Requisition To Resource Division RTOR000104/2022-2023 3659/BD 13/12/2022 0 Resource Division 15.10 0.00 0
2060 Barasat Division Material Requisition To Resource Division RTOR000104/2023-2024 3087/BD 10/10/2023 0 Resource Division 18.46 0.00 0
2061 Barasat Division Material Requisition To Resource Division RTOR000105/2022-2023 3685/BD 14/12/2022 0 Resource Division 117.82 0.00 0
2062 Barasat Division Material Requisition To Resource Division RTOR000105/2023-2024 3088/BD 10/10/2023 0 Resource Division 17.77 0.00 0
2063 Barasat Division Material Requisition To Resource Division RTOR000106/2022-2023 3696/BD 14/12/2022 0 Resource Division 51.36 0.00 0
2064 Barasat Division Material Requisition To Resource Division RTOR000106/2023-2024 3086/BD 10/10/2023 0 Resource Division 28.89 0.00 0
2065 Barasat Division Material Requisition To Resource Division RTOR000107/2022-2023 3693/BD 14/12/2022 0 Resource Division 30.39 0.00 0
2066 Barasat Division Material Requisition To Resource Division RTOR000107/2023-2024 3089/BD 10/10/2023 0 Resource Division 21.99 0.00 0
2067 Barasat Division Material Requisition To Resource Division RTOR000108/2022-2023 3694/BD 14/12/2022 0 Resource Division 26.68 0.00 0
2068 Barasat Division Material Requisition To Resource Division RTOR000108/2023-2024 3090/BD 10/10/2023 0 Resource Division 7.26 0.00 0
2069 Barasat Division Material Requisition To Resource Division RTOR000109/2022-2023 3686/BD 14/12/2022 0 Resource Division 76.22 0.00 0
2070 Barasat Division Material Requisition To Resource Division RTOR000109/2023-2024 3091/BD 10/10/2023 0 Resource Division 11.72 0.00 0
2071 Barasat Division Material Requisition To Resource Division RTOR000110/2022-2023 3695/BD 14/12/2022 0 Resource Division 110.28 0.00 0
2072 Barasat Division Material Requisition To Resource Division RTOR000110/2023-2024 3092/BD 10/10/2023 0 Resource Division 12.26 0.00 0
2073 Barasat Division Material Requisition To Resource Division RTOR000111/2022-2023 3689/BD 14/12/2022 0 Resource Division 124.58 0.00 0
2074 Barasat Division Material Requisition To Resource Division RTOR000111/2023-2024 3094/BD 10/10/2023 0 Resource Division 26.86 0.00 0
2075 Barasat Division Material Requisition To Resource Division RTOR000112/2022-2023 3699/BD 14/12/2022 0 Resource Division 26.46 0.00 0
2076 Barasat Division Material Requisition To Resource Division RTOR000112/2023-2024 3095/BD 10/10/2023 0 Resource Division 21.72 0.00 0
2077 Barasat Division Material Requisition To Resource Division RTOR000113/2022-2023 3697/BD 14/12/2022 0 Resource Division 21.19 0.00 0
2078 Barasat Division Material Requisition To Resource Division RTOR000113/2023-2024 4022/BD 12/10/2023 0 Resource Division 55.30 0.00 0
2079 Barasat Division Material Requisition To Resource Division RTOR000114/2022-2023 3690/BD 14/12/2022 0 Resource Division 52.10 0.00 0
2080 Barasat Division Material Requisition To Resource Division RTOR000114/2023-2024 4023/BD 12/10/2023 0 Resource Division 25.78 0.00 0
2081 Barasat Division Material Requisition To Resource Division RTOR000115/2022-2023 3686/BD 14/12/2022 0 Resource Division 12.95 0.00 0
2082 Barasat Division Material Requisition To Resource Division RTOR000115/2023-2024 4020/BD 12/10/2023 0 Resource Division 17.25 0.00 0
2083 Barasat Division Material Requisition To Resource Division RTOR000116/2022-2023 3687/BD 14/12/2022 0 Resource Division 7.03 0.00 0
2084 Barasat Division Material Requisition To Resource Division RTOR000116/2023-2024 4021/BD 12/10/2023 0 Resource Division 24.50 0.00 0
2085 Barasat Division Material Requisition To Resource Division RTOR000117/2022-2023 3691/BD 14/12/2022 0 Resource Division 12.68 0.00 0
2086 Barasat Division Material Requisition To Resource Division RTOR000117/2023-2024 4024/BD 12/10/2023 0 Resource Division 123.26 0.00 0
2087 Barasat Division Material Requisition To Resource Division RTOR000118/2022-2023 3692/BD 14/12/2022 0 Resource Division 0.41 0.00 0
2088 Barasat Division Material Requisition To Resource Division RTOR000118/2023-2024 4025/BD 12/10/2023 0 Resource Division 78.14 0.00 0
2089 Barasat Division Material Requisition To Resource Division RTOR000119/2022-2023 3688/BD 14/12/2022 0 Resource Division 35.66 0.00 0
2090 Barasat Division Material Requisition To Resource Division RTOR000119/2023-2024 4173/BD 30/10/2023 0 Resource Division 37.95 0.00 0
2091 Barasat Division Material Requisition To Resource Division RTOR000120/2022-2023 3711/BD 15/12/2022 0 Resource Division 14.86 0.00 0
2092 Barasat Division Material Requisition To Resource Division RTOR000120/2023-2024 4175/BD 30/10/2023 0 Resource Division 18.56 0.00 0
2093 Barasat Division Material Requisition To Resource Division RTOR000121/2022-2023 3713/BD 15/12/2022 0 Resource Division 11.89 0.00 0
2094 Barasat Division Material Requisition To Resource Division RTOR000121/2023-2024 4174/BD 30/10/2023 0 Resource Division 10.35 0.00 0
2095 Barasat Division Material Requisition To Resource Division RTOR000122/2022-2023 3712/BD 15/12/2022 0 Resource Division 1.79 0.00 0
2096 Barasat Division Material Requisition To Resource Division RTOR000123/2022-2023 3710/BD 15/12/2022 0 Resource Division 18.47 0.00 0
2097 Barasat Division Material Requisition To Resource Division RTOR000124/2022-2023 3790/BD 22/12/2022 0 Resource Division 34.22 0.00 0
2098 Barasat Division Material Requisition To Resource Division RTOR000124/2023-2024 4368/BD 10/11/2023 0 Resource Division 21.03 0.00 0
2099 Barasat Division Material Requisition To Resource Division RTOR000125/2022-2023 3796/BD 22/12/2022 0 Resource Division 177.61 0.00 0
2100 Barasat Division Material Requisition To Resource Division RTOR000126/2022-2023 3797/BD 22/12/2022 0 Resource Division 6.17 0.00 0
2101 Barasat Division Material Requisition To Resource Division RTOR000126/2023-2024 4373/BD 10/11/2023 0 Resource Division 16.37 0.00 0
2102 Barasat Division Material Requisition To Resource Division RTOR000127/2022-2023 3789/BD 22/12/2022 0 Resource Division 26.74 0.00 0
2103 Barasat Division Material Requisition To Resource Division RTOR000128/2022-2023 3791/BD 22/12/2022 0 Resource Division 10.96 0.00 0
2104 Barasat Division Material Requisition To Resource Division RTOR000128/2023-2024 4369/BD 10/11/2023 0 Resource Division 1.35 0.00 0
2105 Barasat Division Material Requisition To Resource Division RTOR000129/2022-2023 3792/BD 22/12/2022 0 Resource Division 14.47 0.00 0
2106 Barasat Division Material Requisition To Resource Division RTOR000129/2023-2024 4375/BD 10/11/2023 0 Resource Division 12.98 0.00 0
2107 Barasat Division Material Requisition To Resource Division RTOR000130/2022-2023 3793/BD 22/12/2022 0 Resource Division 272.77 0.00 0
2108 Barasat Division Material Requisition To Resource Division RTOR000130/2023-2024 4374/BD 10/11/2023 0 Resource Division 9.49 0.00 0
2109 Barasat Division Material Requisition To Resource Division RTOR000131/2022-2023 3798/BD 22/12/2022 0 Resource Division 9.95 0.00 0
2110 Barasat Division Material Requisition To Resource Division RTOR000132/2022-2023 3800/BD 22/12/2022 0 Resource Division 4.41 0.00 0
2111 Barasat Division Material Requisition To Resource Division RTOR000132/2023-2024 4370/BD 10/11/2023 0 Resource Division 90.94 0.00 0
2112 Barasat Division Material Requisition To Resource Division RTOR000133/2022-2023 3799/BD 22/12/2022 0 Resource Division 90.58 0.00 0
2113 Barasat Division Material Requisition To Resource Division RTOR000133/2023-2024 4371/BD 10/11/2023 0 Resource Division 94.42 0.00 0
2114 Barasat Division Material Requisition To Resource Division RTOR000134/2022-2023 3794/BD 22/12/2022 0 Resource Division 21.91 0.00 0
2115 Barasat Division Material Requisition To Resource Division RTOR000134/2023-2024 4366/BD 10/11/2023 0 Resource Division 38.51 0.00 0
2116 Barasat Division Material Requisition To Resource Division RTOR000135/2022-2023 3795/BD 22/12/2022 0 Resource Division 0.87 0.00 0
2117 Barasat Division Material Requisition To Resource Division RTOR000136/2022-2023 3811/BD 23/12/2022 0 Resource Division 83.52 0.00 0
2118 Barasat Division Material Requisition To Resource Division RTOR000136/2023-2024 4408/BD 10/11/2023 0 Resource Division 6.16 0.00 0
2119 Barasat Division Material Requisition To Resource Division RTOR000137/2022-2023 3812/BD 23/12/2022 0 Resource Division 0.33 0.00 0
2120 Barasat Division Material Requisition To Resource Division RTOR000137/2023-2024 4423/BD 10/11/2023 0 Resource Division 6.16 0.00 0
2121 Barasat Division Material Requisition To Resource Division RTOR000138/2022-2023 3813/BD 23/12/2022 0 Resource Division 98.04 0.00 0
2122 Barasat Division Material Requisition To Resource Division RTOR000138/2023-2024 4424/BD 10/11/2023 0 Resource Division 47.88 0.00 0
2123 Barasat Division Material Requisition To Resource Division RTOR000139/2022-2023 3816/BD 23/12/2022 0 Resource Division 17.46 0.00 0
2124 Barasat Division Material Requisition To Resource Division RTOR000139/2023-2024 4425/BD 10/11/2023 0 Resource Division 17.40 0.00 0
2125 Barasat Division Material Requisition To Resource Division RTOR000140/2022-2023 3817/BD 23/12/2022 0 Resource Division 87.92 0.00 0
2126 Barasat Division Material Requisition To Resource Division RTOR000140/2023-2024 4409/BD 10/11/2023 0 Resource Division 42.27 0.00 0
2127 Barasat Division Material Requisition To Resource Division RTOR000141/2022-2023 3818/BD 23/12/2022 0 Resource Division 27.79 0.00 0
2128 Barasat Division Material Requisition To Resource Division RTOR000141/2023-2024 4420/BD 10/11/2023 0 Resource Division 9.36 0.00 0
2129 Barasat Division Material Requisition To Resource Division RTOR000142/2022-2023 3819/BD 23/12/2022 0 Resource Division 23.93 0.00 0
2130 Barasat Division Material Requisition To Resource Division RTOR000142/2023-2024 4427/BD 10/11/2023 0 Resource Division 23.94 0.00 0
2131 Barasat Division Material Requisition To Resource Division RTOR000143/2022-2023 3814/BD 23/12/2022 0 Resource Division 17.36 0.00 0
2132 Barasat Division Material Requisition To Resource Division RTOR000143/2023-2024 4420/BD 10/11/2023 0 Resource Division 4.93 0.00 0
2133 Barasat Division Material Requisition To Resource Division RTOR000144/2022-2023 3821/BD 23/12/2022 0 Resource Division 27.91 0.00 0
2134 Barasat Division Material Requisition To Resource Division RTOR000144/2023-2024 4421/BD 10/11/2023 0 Resource Division 39.07 0.00 0
2135 Barasat Division Material Requisition To Resource Division RTOR000145/2022-2023 3820/BD 23/12/2022 0 Resource Division 16.81 0.00 0
2136 Barasat Division Material Requisition To Resource Division RTOR000145/2023-2024 4410/BD 10/11/2023 0 Resource Division 12.32 0.00 0
2137 Barasat Division Material Requisition To Resource Division RTOR000146/2022-2023 3815/BD 23/12/2022 0 Resource Division 2.38 0.00 0
2138 Barasat Division Material Requisition To Resource Division RTOR000146/2023-2024 4422/BD 10/11/2023 0 Resource Division 9.24 0.00 0
2139 Barasat Division Material Requisition To Resource Division RTOR000147/2022-2023 3816/BD 23/12/2022 0 Resource Division 119.56 0.00 0
2140 Barasat Division Material Requisition To Resource Division RTOR000147/2023-2024 4426/BD 10/11/2023 0 Resource Division 13.34 0.00 0
2141 Barasat Division Material Requisition To Resource Division RTOR000148/2022-2023 3809/BD 23/12/2022 0 Resource Division 0.41 0.00 0
2142 Barasat Division Material Requisition To Resource Division RTOR000148/2023-2024 4406/BD 10/11/2023 0 Resource Division 15.40 0.00 0
2143 Barasat Division Material Requisition To Resource Division RTOR000149/2022-2023 3810/BD 23/12/2022 0 Resource Division 2.38 0.00 0
2144 Barasat Division Material Requisition To Resource Division RTOR000149/2023-2024 4407/BD 10/11/2023 0 Resource Division 5.73 0.00 0
2145 Barasat Division Material Requisition To Resource Division RTOR000150/2022-2023 44/BD 04/01/2023 0 Resource Division 61.60 0.00 0
2146 Barasat Division Material Requisition To Resource Division RTOR000150/2023-2024 4411/BD 10/11/2023 0 Resource Division 7.39 0.00 0
2147 Barasat Division Material Requisition To Resource Division RTOR000151/2022-2023 78/BD 10/01/2023 0 Resource Division 118.89 0.00 0
2148 Barasat Division Material Requisition To Resource Division RTOR000151/2023-2024 4412/BD 10/11/2023 0 Resource Division 16.02 0.00 0
2149 Barasat Division Material Requisition To Resource Division RTOR000152/2022-2023 1256/BD 25/04/2023 0 Resource Division 12.08 0.00 0
2150 Barasat Division Material Requisition To Resource Division RTOR000152/2023-2024 4413/BD 10/11/2023 0 Resource Division 6.16 0.00 0
2151 Barasat Division Material Requisition To Resource Division RTOR000153/2022-2023 1259/BD 25/04/2023 0 Resource Division 17.95 0.00 0
2152 Barasat Division Material Requisition To Resource Division RTOR000153/2023-2024 4414/BD 10/11/2023 0 Resource Division 18.48 0.00 0
2153 Barasat Division Material Requisition To Resource Division RTOR000154/2022-2023 1255/BD 25/04/2023 0 Resource Division 73.62 0.00 0
2154 Barasat Division Material Requisition To Resource Division RTOR000154/2023-2024 4415/BD 10/11/2023 0 Resource Division 9.24 0.00 0
2155 Barasat Division Material Requisition To Resource Division RTOR000155/2022-2023 1258/BD 25/04/2023 0 Resource Division 147.75 0.00 0
2156 Barasat Division Material Requisition To Resource Division RTOR000155/2023-2024 4416/BD 10/11/2023 0 Resource Division 12.32 0.00 0
2157 Barasat Division Material Requisition To Resource Division RTOR000156/2022-2023 1257/BD 25/04/2023 0 Resource Division 64.80 0.00 0
2158 Barasat Division Material Requisition To Resource Division RTOR000156/2023-2024 4419/BD 10/11/2023 0 Resource Division 9.24 0.00 0
2159 Barasat Division Material Requisition To Resource Division RTOR000157/2022-2023 156/BD 18/01/2023 0 Resource Division 35.12 0.00 0
2160 Barasat Division Material Requisition To Resource Division RTOR000157/2023-2024 4417/BD 10/11/2023 0 Resource Division 11.09 0.00 0
2161 Barasat Division Material Requisition To Resource Division RTOR000158/2022-2023 493/BD 17/02/2023 0 Resource Division 10.73 0.00 0
2162 Barasat Division Material Requisition To Resource Division RTOR000158/2023-2024 4404/BD 10/11/2023 0 Resource Division 18.48 0.00 0
2163 Barasat Division Material Requisition To Resource Division RTOR000159/2022-2023 496/BD 17/02/2023 0 Resource Division 29.48 0.00 0
2164 Barasat Division Material Requisition To Resource Division RTOR000159/2023-2024 4418/BD 10/11/2023 0 Resource Division 6.16 0.00 0
2165 Barasat Division Material Requisition To Resource Division RTOR000160/2022-2023 495/BD 17/02/2023 0 Resource Division 44.41 0.00 0
2166 Barasat Division Material Requisition To Resource Division RTOR000160/2023-2024 4405/BD 10/11/2023 0 Resource Division 3.08 0.00 0
2167 Barasat Division Material Requisition To Resource Division RTOR000161/2022-2023 494/BD 17/02/2023 0 Resource Division 2.75 0.00 0
2168 Barasat Division Material Requisition To Resource Division RTOR000162/2022-2023 492/BD 17/02/2023 0 Resource Division 12.12 0.00 0
2169 Barasat Division Material Requisition To Resource Division RTOR000162/2023-2024 4509/BD 28/11/2023 0 Resource Division 17.23 0.00 0
2170 Barasat Division Material Requisition To Resource Division RTOR000163/2022-2023 490/BD 17/02/2023 0 Resource Division 89.49 0.00 0
2171 Barasat Division Material Requisition To Resource Division RTOR000163/2023-2024 4510/BD 28/11/2023 0 Resource Division 18.10 0.00 0
2172 Barasat Division Material Requisition To Resource Division RTOR000164/2022-2023 488/BD 17/02/2023 0 Resource Division 57.91 0.00 0
2173 Barasat Division Material Requisition To Resource Division RTOR000164/2023-2024 4511/BD 28/11/2023 0 Resource Division 26.12 0.00 0
2174 Barasat Division Material Requisition To Resource Division RTOR000165/2022-2023 486/BD 17/02/2023 0 Resource Division 22.66 0.00 0
2175 Barasat Division Material Requisition To Resource Division RTOR000165/2023-2024 4508/BD 28/11/2023 0 Resource Division 33.88 0.00 0
2176 Barasat Division Material Requisition To Resource Division RTOR000166/2022-2023 484/BD 17/02/2023 0 Resource Division 4.43 0.00 0
2177 Barasat Division Material Requisition To Resource Division RTOR000166/2023-2024 4559/BD 01/12/2023 0 Resource Division 74.49 0.00 0
2178 Barasat Division Material Requisition To Resource Division RTOR000167/2022-2023 482/BD 17/02/2023 0 Resource Division 70.46 0.00 0
2179 Barasat Division Material Requisition To Resource Division RTOR000168/2022-2023 483/BD 17/02/2023 0 Resource Division 0.55 0.00 0
2180 Barasat Division Material Requisition To Resource Division RTOR000169/2022-2023 485/BD 17/02/2023 0 Resource Division 0.44 0.00 0
2181 Barasat Division Material Requisition To Resource Division RTOR000170/2022-2023 487/BD 17/02/2023 0 Resource Division 237.82 0.00 0
2182 Barasat Division Material Requisition To Resource Division RTOR000171/2022-2023 489/BD 17/02/2023 0 Resource Division 28.30 0.00 0
2183 Barasat Division Material Requisition To Resource Division RTOR000172/2022-2023 491/BD 17/02/2023 0 Resource Division 184.92 0.00 0
2184 Barasat Division Material Requisition To Resource Division RTOR000173/2022-2023 520/BD 20/02/2023 0 Resource Division 14.66 0.00 0
2185 Barasat Division Material Requisition To Resource Division RTOR000174/2022-2023 521/BD 20/02/2023 0 Resource Division 138.01 0.00 0
2186 Barasat Division Material Requisition To Resource Division RTOR000175/2022-2023 519/BD 20/02/2023 0 Resource Division 145.86 0.00 0
2187 Barasat Division Material Requisition To Resource Division RTOR000176/2022-2023 518/BD 20/02/2023 0 Resource Division 124.37 0.00 0
2188 Barasat Division Material Requisition To Resource Division RTOR000177/2022-2023 598/BD 23/02/2023 0 Resource Division 22.18 0.00 0
2189 Barasat Division Material Requisition To Resource Division RTOR000178/2022-2023 603/BD 23/02/2023 0 Resource Division 38.14 0.00 0
2190 Barasat Division Material Requisition To Resource Division RTOR000179/2022-2023 610/BD 23/02/2023 0 Resource Division 10.10 0.00 0
2191 Barasat Division Material Requisition To Resource Division RTOR000180/2022-2023 601/BD 23/02/2023 0 Resource Division 6.94 0.00 0
2192 Barasat Division Material Requisition To Resource Division RTOR000181/2022-2023 599/BD 23/02/2023 0 Resource Division 7.47 0.00 0
2193 Barasat Division Material Requisition To Resource Division RTOR000182/2022-2023 604/BD 23/02/2023 0 Resource Division 9.83 0.00 0
2194 Barasat Division Material Requisition To Resource Division RTOR000183/2022-2023 609/BD 23/02/2023 0 Resource Division 19.95 0.00 0
2195 Barasat Division Material Requisition To Resource Division RTOR000184/2022-2023 597/BD 23/02/2023 0 Resource Division 6.69 0.00 0
2196 Barasat Division Material Requisition To Resource Division RTOR000185/2022-2023 606/BD 23/02/2023 0 Resource Division 10.48 0.00 0
2197 Barasat Division Material Requisition To Resource Division RTOR000185/2023-2024 385/BD 07/02/2024 0 Resource Division 65.63 0.00 0
2198 Barasat Division Material Requisition To Resource Division RTOR000186/2022-2023 608/BD 23/02/2023 0 Resource Division 40.91 0.00 0
2199 Barasat Division Material Requisition To Resource Division RTOR000187/2022-2023 596/BD 23/02/2023 0 Resource Division 16.40 0.00 0
2200 Barasat Division Material Requisition To Resource Division RTOR000188/2022-2023 600/BD 23/02/2023 0 Resource Division 9.36 0.00 0
2201 Barasat Division Material Requisition To Resource Division RTOR000189/2022-2023 607/BD 23/02/2023 0 Resource Division 8.60 0.00 0
2202 Barasat Division Material Requisition To Resource Division RTOR000190/2022-2023 602/BD 23/02/2023 0 Resource Division 31.31 0.00 0
2203 Barasat Division Material Requisition To Resource Division RTOR000191/2022-2023 605/BD 23/02/2023 0 Resource Division 20.70 0.00 0
2204 Barasat Division Material Requisition To Resource Division RTOR000192/2022-2023 611/BD 23/02/2023 0 Resource Division 10.10 0.00 0
2205 Barasat Division Material Requisition To Resource Division RTOR000193/2022-2023 678/BD 01/03/2023 0 Resource Division 24.64 0.00 0
2206 Barasat Division Material Requisition To Resource Division RTOR000194/2022-2023 677/BD 01/03/2023 0 Resource Division 61.60 0.00 0
2207 Barasat Division Material Requisition To Resource Division RTOR000196/2022-2023 854/BD 20/03/2023 0 Resource Division 377.63 0.00 0
2208 Barasat Division Material Requisition To Resource Division RTOR000197/2022-2023 857/BD 20/03/2023 0 Resource Division 190.23 0.00 0
2209 Barasat Division Material Requisition To Resource Division RTOR000198/2022-2023 853/BD 20/03/2023 0 Resource Division 51.49 0.00 0
2210 Barasat Division Material Requisition To Resource Division RTOR000199/2022-2023 855/BD 20/03/2023 0 Resource Division 71.29 0.00 0
2211 Barasat Division Material Requisition To Resource Division RTOR000200/2022-2023 856/BD 20/03/2023 0 Resource Division 23.33 0.00 0
2212 Barasat Division Material Requisition To Resource Division RTOR000201/2022-2023 859/BD 20/03/2023 0 Resource Division 48.85 0.00 0
2213 Barasat Division Material Requisition To Resource Division RTOR000202/2022-2023 858/BD 20/03/2023 0 Resource Division 0.84 0.00 0
2214 Barasat Division Material Requisition To Resource Division RTOR000203/2022-2023 860/BD 20/03/2023 0 Resource Division 60.86 0.00 0
2215 Barasat Division Material Requisition To Resource Division RTOR000204/2022-2023 890/BD 22/03/2023 0 Resource Division 46.13 0.00 0
2216 Barasat Division Material Requisition To Resource Division RTOR000205/2022-2023 887/BD 22/03/2023 0 Resource Division 17.54 0.00 0
2217 Barasat Division Material Requisition To Resource Division RTOR000206/2022-2023 888/BD 22/03/2023 0 Resource Division 168.16 0.00 0
2218 Barasat Division Material Requisition To Resource Division RTOR000207/2022-2023 889/BD 22/03/2023 0 Resource Division 12.10 0.00 0
2219 Barasat Division Material Requisition To Resource Division RTOR000208/2022-2023 893/BD 22/03/2023 0 Resource Division 45.01 0.00 0
2220 Barasat Division Material Requisition To Resource Division RTOR000209/2022-2023 885/BD 22/03/2023 0 Resource Division 14.83 0.00 0
2221 Barasat Division Material Requisition To Resource Division RTOR000210/2022-2023 892/BD 22/03/2023 0 Resource Division 17.66 0.00 0
2222 Barasat Division Material Requisition To Resource Division RTOR000211/2022-2023 891/BD 22/03/2023 0 Resource Division 15.90 0.00 0
2223 Barasat Division Material Requisition To Resource Division RTOR000212/2022-2023 895/BD 22/03/2023 0 Resource Division 27.76 0.00 0
2224 Barasat Division Material Requisition To Resource Division RTOR000213/2022-2023 883/BD 22/03/2023 0 Resource Division 28.59 0.00 0
2225 Barasat Division Material Requisition To Resource Division RTOR000214/2022-2023 882/BD 22/03/2023 0 Resource Division 18.22 0.00 0
2226 Barasat Division Material Requisition To Resource Division RTOR000215/2022-2023 884/BD 22/03/2023 0 Resource Division 17.11 0.00 0
2227 Barasat Division Material Requisition To Resource Division RTOR000216/2022-2023 894/BD 22/03/2023 0 Resource Division 33.53 0.00 0
2228 Barasat Division Material Requisition To Resource Division RTOR000217/2022-2023 896/BD 22/03/2023 0 Resource Division 18.77 0.00 0
2229 Barasat Division Material Requisition To Resource Division RTOR000218/2022-2023 886/BD 22/03/2023 0 Resource Division 11.94 0.00 0
2230 Barasat Division Material Requisition To Resource Division RTOR000219/2022-2023 887/BD 22/03/2023 0 Resource Division 12.08 0.00 0
2231 Barasat Division Material Requisition To Resource Division RTOR000220/2022-2023 873/BD 22/03/2023 0 Resource Division 17.57 0.00 0
2232 Barasat Division Material Requisition To Resource Division RTOR000221/2022-2023 876/BD 22/03/2023 0 Resource Division 30.63 0.00 0
2233 Barasat Division Material Requisition To Resource Division RTOR000222/2022-2023 877/BD 22/03/2023 0 Resource Division 30.59 0.00 0
2234 Barasat Division Material Requisition To Resource Division RTOR000223/2022-2023 874/BD 22/03/2023 0 Resource Division 15.62 0.00 0
2235 Barasat Division Material Requisition To Resource Division RTOR000224/2022-2023 875/BD 22/03/2023 0 Resource Division 28.40 0.00 0
2236 Barasat Division Material Requisition To Resource Division RTOR000225/2022-2023 880/BD 22/03/2023 0 Resource Division 16.26 0.00 0
2237 Barasat Division Material Requisition To Resource Division RTOR000226/2022-2023 872/BD 22/03/2023 0 Resource Division 296.35 0.00 0
2238 Barasat Division Material Requisition To Resource Division RTOR000227/2022-2023 879/BD 22/03/2023 0 Resource Division 23.37 0.00 0
2239 Barasat Division Material Requisition To Resource Division RTOR000228/2022-2023 871/BD 22/03/2023 0 Resource Division 249.11 0.00 0
2240 Barasat Division Material Requisition To Resource Division RTOR000229/2022-2023 878/BD 22/03/2023 0 Resource Division 42.93 0.00 0
2241 Barasat Division Material Requisition To Resource Division RTOR000230/2022-2023 881/BD 22/03/2023 0 Resource Division 24.21 0.00 0
2242 Barasat Division Material Requisition To Resource Division RTOR000231/2022-2023 869/BD 22/03/2023 0 Resource Division 45.98 0.00 0
2243 Barasat Division Material Requisition To Resource Division RTOR000232/2022-2023 868/BD 22/03/2023 0 Resource Division 23.84 0.00 0
2244 Barasat Division Material Requisition To Resource Division RTOR000233/2022-2023 870/BD 22/03/2023 0 Resource Division 51.83 0.00 0
2245 Barasat Division Material Requisition To Resource Division RTOR000234/2022-2023 935/BD 22/03/2023 0 Resource Division 80.45 0.00 0
2246 Barasat Division Material Requisition To Resource Division RTOR000235/2022-2023 911/BD 22/03/2023 0 Resource Division 348.37 0.00 0
2247 Barasat Division Material Requisition To Resource Division RTOR000236/2022-2023 926/BD 22/03/2023 0 Resource Division 4.71 0.00 0
2248 Barasat Division Material Requisition To Resource Division RTOR000237/2022-2023 928/BD 22/03/2023 0 Resource Division 55.90 0.00 0
2249 Barasat Division Material Requisition To Resource Division RTOR000238/2022-2023 930/BD 22/03/2023 0 Resource Division 86.74 0.00 0
2250 Barasat Division Material Requisition To Resource Division RTOR000239/2022-2023 912/BD 22/03/2023 0 Resource Division 163.73 0.00 0
2251 Barasat Division Material Requisition To Resource Division RTOR000240/2022-2023 932/BD 22/03/2023 0 Resource Division 221.49 0.00 0
2252 Barasat Division Material Requisition To Resource Division RTOR000241/2022-2023 934/BD 22/03/2023 0 Resource Division 27.49 0.00 0
2253 Barasat Division Material Requisition To Resource Division RTOR000242/2022-2023 936/BD 22/03/2023 0 Resource Division 28.95 0.00 0
2254 Barasat Division Material Requisition To Resource Division RTOR000243/2022-2023 940/BD 22/03/2023 0 Resource Division 25.03 0.00 0
2255 Barasat Division Material Requisition To Resource Division RTOR000244/2022-2023 914/BD 22/03/2023 0 Resource Division 36.68 0.00 0
2256 Barasat Division Material Requisition To Resource Division RTOR000245/2022-2023 939/BD 22/03/2023 0 Resource Division 9.92 0.00 0
2257 Barasat Division Material Requisition To Resource Division RTOR000246/2022-2023 931/BD 22/03/2023 0 Resource Division 9.92 0.00 0
2258 Barasat Division Material Requisition To Resource Division RTOR000247/2022-2023 938/BD 22/03/2023 0 Resource Division 19.76 0.00 0
2259 Barasat Division Material Requisition To Resource Division RTOR000248/2022-2023 937/BD 22/03/2023 0 Resource Division 50.86 0.00 0
2260 Barasat Division Material Requisition To Resource Division RTOR000249/2022-2023 933/BD 22/03/2023 0 Resource Division 120.60 0.00 0
2261 Barasat Division Material Requisition To Resource Division RTOR000250/2022-2023 929/BD 22/03/2023 0 Resource Division 50.77 0.00 0
2262 Barasat Division Material Requisition To Resource Division RTOR000252/2022-2023 916/BD 22/03/2023 0 Resource Division 13.65 0.00 0
2263 Barasat Division Material Requisition To Resource Division RTOR000253/2022-2023 919/BD 22/03/2023 0 Resource Division 34.37 0.00 0
2264 Barasat Division Material Requisition To Resource Division RTOR000254/2022-2023 925/BD 22/03/2023 0 Resource Division 280.28 0.00 0
2265 Barasat Division Material Requisition To Resource Division RTOR000255/2022-2023 941/BD 22/03/2023 0 Resource Division 9.14 0.00 0
2266 Barasat Division Material Requisition To Resource Division RTOR000256/2022-2023 923/BD 22/03/2023 0 Resource Division 94.23 0.00 0
2267 Barasat Division Material Requisition To Resource Division RTOR000257/2022-2023 918/BD 22/03/2023 0 Resource Division 10.90 0.00 0
2268 Barasat Division Material Requisition To Resource Division RTOR000258/2022-2023 920/BD 22/03/2023 0 Resource Division 137.48 0.00 0
2269 Barasat Division Material Requisition To Resource Division RTOR000259/2022-2023 921/BD 22/03/2023 0 Resource Division 101.89 0.00 0
2270 Barasat Division Material Requisition To Resource Division RTOR000260/2022-2023 917/BD 22/03/2023 0 Resource Division 2.48 0.00 0
2271 Barasat Division Material Requisition To Resource Division RTOR000261/2022-2023 922/BD 22/03/2023 0 Resource Division 22.12 0.00 0
2272 Barasat Division Material Requisition To Resource Division RTOR000262/2022-2023 915/BD 22/03/2023 0 Resource Division 22.12 0.00 0
2273 Barasat Division Material Requisition To Resource Division RTOR000263/2022-2023 913/BD 22/03/2023 0 Resource Division 48.74 0.00 0
Total 1,69,001.48 87,102.38