No. of work order not mapped with AE/JE
Exception Report Showing the Status of Major Pending Works for the Divisions

Update Data
Rs. in Lakh
Sl. No. Division
Working Divisions
System Order No
System generated Order No. for the Work Order as per PHED-MIS
Order Date
Date of Issuance of the Work Order as per PHED-MIS
Memo Number
Memo no. for Work Order Provided by the Divisions as per PHED-MIS
Vendor Name
Vendor Appointed Against this Work Order as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Order Value
Value of Work as mentioned in the Work Order
26 1,687.84
1 Demo Civil Office of Executive Engineer ORD/000505/2023-2024 14/08/2023 2358/BQA RAISINHA INFRASTRUCTURE PVT. LTD. Sinking of 4 (Four) Nos. 200 mm dia. X 3.50 Mtr. depth horizontal river bed tube well using MS "T" and Laying, Fitting & fixing 100 mm M.S. collecting line from river bed tube well to CWR with allied works, Construction of 150 Cum. OHR, 100 Cum. Clear Wa 289.50
2 Demo Civil Office of Executive Engineer ORD/000739/2023-2024 31/10/2023 4652/BWD STARCO CONSTRUCTIONS Different works related (sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of different capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land 900.17
3 Demo Civil Office of Executive Engineer ORD/000801/2025-2026 09/04/2025 1732/AD SARADA CONSTRUCTION Construction of 300 cum. Over Head Reservoir (OHR) (20 mtr. Staging Height) including soil investigation for Augmentation of Ramratanpur Water Supply Scheme, Block - Kakdwip for implementation of JJM under Kakdwip Sub-Division of Alipore Division, P.H.E. 111.67
4 Demo Civil Office of Executive Engineer ORD/000802/2025-2026 30/05/2025 2521/AD S.P. CONSTRUCTION (I) Laying pipe line from C.W.R. - 2 to O.H.R. point of Augmentation of Ground Water Based at Gosaba (Zone-II) W/S Scheme, Block-Gosaba under Canning Sub-Division of Alipore Division, P.H.E. Dte. 25.17
5 Demo Civil Office of Executive Engineer ORD/000804/2025-2026 28/05/2025 1749/BD CHANCHAL ENTERPRISE & CO. Formal work order for Withdrawing, relaying and laying of different dia. UPVC/DI pipe line at Bangali para, near cyclone centre, Sahaji para, shayam molla para, Barik para, Ghorami para etc of Jhupkhali and Nazat BDO office, Metekhali, Parsemari & othe 177.38
6 Demo Civil Office of Executive Engineer ORD/000806/2025-2026 29/05/2025 944/HSD NEW LIFE CONSTRUCTION. Acceptance cum work order for Supply and installation of 150 mm dia sluice valve in distribution pipe line for smooth supply of water at different palces in connection with augmentation of Korakati water supply scheme, Sandeshkhali-II Block under Hasnaba 0.83
7 Demo Civil Office of Executive Engineer ORD/000807/2025-2026 20/06/2025 2051/BD M/S K.P.PAL. Acceptance cum work order for Sinking of 1 nos. 300mm. x 200 mm. big dia 300 mtr deep Tube well by Direct Rotary Rig method using PVC pipe & strainer having 300 mm Dia 42 mtr. long Housing Pipe and 200mm Dia 30 mtr. long filter for Augmentation of Pas 21.76
8 Demo Civil Office of Executive Engineer ORD/000810/2025-2026 30/05/2025 2530/AD M/S. S.S. ENTERPRISE Remuneration of Chemist/ Bacteriologist and Laboratory Assistant for 04 nos. P.H.E Dte. Water Testing Laboratories (Kakdwip Sub-District Laboratory, Ramganga Sub-District Laboratory, Raidighi Sub-District Laboratory, Basanti Sub-District Laboratory) under 29.26
9 Demo Civil Office of Executive Engineer ORD/000813/2025-2026 30/05/2025 2521/AD S.P. CONSTRUCTION (I) Laying pipe line from C.W.R. - 2 to O.H.R. point of Augmentation of Ground Water Based at Gosaba (Zone-II) W/S Scheme, Block-Gosaba under Canning Sub-Division of Alipore Division, P.H.E. Dte. 25.17
10 Demo Civil Office of Executive Engineer ORD/000801/2024-2025 15/06/2024 2515/AD SHREE J M CONSTRUCTION Sinking of 01 No. 250mm x 150mm dia. 360 mtr. deep Tubewell by D.R. Rig method using UPVC Pipe & Pre-packed Resin Bonded Gravel Filter for Ganeshpur Kalinagar Zone- I & II W/S Scheme, Block - Kakdwip under JJM under Kakdwip Sub-Division of Alipore Divisio 20.39
11 Demo Civil Office of Executive Engineer ORD/000802/2024-2025 05/10/2024 4141/AD S. CHAKRABORTY AND CO. Sinking of 01 No. 250mm x 150mm dia. 360 mtr. deep Tubewell by D.R. Rig method using UPVC Pipe & Pre-packed Resin Bonded Gravel Filter for Ramchandrapur W/S Scheme, Block - Kakdwip for implementing of JJM under Kakdwip Sub-Division of Alipore Division, P. 20.41
12 Demo Civil Office of Executive Engineer ORD/000803/2024-2025 28/09/2024 4002/AD PARBATI MONDAL Hiring of an Inspection Vehicle (Diesel Operated with Luxury Permit) for use of the Govt. Officials under Alipore Division, PHE Dte. for the period from 01.07.2024 to 30.06.2025 [Actually work order valid for the period from 01.10.2024 to 31.12.2024 - 3 m 1.20
13 Demo Civil Office of Executive Engineer ORD/000804/2024-2025 26/07/2024 1177/KSD PIKASU BOSE Continuation order for Hiring of Diesel Car / Luxury Taxi for official use of the Assistant Engineer, Kakdwip Sub Division, P.H.E. Dte. for the period from 01.08.2024 to 31.01.2025 2.40
14 Demo Civil Office of Executive Engineer ORD/000805/2024-2025 29/08/2024 3815/AD FIROJA KHATUN Hiring of an Inspection Vehicle (Diesel Operated with Luxury Permit) for use of the Assistant Engineer (HQ-I) under Alipore Division, PHE Dte. (From 01.09.2024 To 28.02.2025) 2.40
15 Demo Civil Office of Executive Engineer ORD/000803/2023-2024 29/12/2023 5112/AD M/S P. B. CONSTRUCTION Continuation work order for the work of Hiring of an Inspection Vehicle (Diesel Operated with Luxury Permit) for use of the Executive Engineer, Alipore Division, PHE Dte. for the period from 01.01.2024 to 30.06.2024. 2.40
16 Demo Civil Office of Executive Engineer ORD/000804/2023-2024 08/02/2024 920/AD NEPAL CHANDRA PRADHAN Construction of boundary wall along with Land Development, Plinth Protection and Approach Road for Pump House at 3rd Tubewell Site for Augmentation of Mrityunjaynagar W/S scheme, Block - Sagar under JJM of Kakdwip Sub-Division under Alipore Division, P.H. 11.88
17 Demo Civil Office of Executive Engineer ORD/000805/2023-2024 22/02/2024 1572/CSD M/S P. B. CONSTRUCTION Additional work for rising main, inter connection and restoration work at Taldi W/S Scheme (Zone - I), Block- Canning-I under Canning Sub-Division of Alipore Division, P.H.E. Dte. 3.96
18 Demo Civil Office of Executive Engineer ORD/000806/2023-2024 01/08/2023 1913/AD BABUN ENTERPRISE Laying of 63 mm dia. UPVC pipe line for providing FHTC to the household under JJM at Piprakhali W/S Scheme, Block - Pathar Pratima under Kakdwip Sub Division of Alipore Division, P.H.E. Dte. 4.86
19 Demo Civil Office of Executive Engineer ORD/000809/2023-2024 23/02/2024 1103/AD DEEPAK KUMAR PRASAD Hiring of an Inspection Vehicle (Diesel Operated with Luxury Permit) for use of the Assistant Engineer (HQ-II) under Alipore Division, PHE Dte. (From 01.03.2024 to 31.08.2024) 2.40
20 Demo Civil Office of Executive Engineer ORD/000808/2024-2025 29/08/2024 2484/BD SUSMITA MANDAL. Acceptance cum work order for Supply of one motor launch on daily hire basis for use of Hasnabad Sub-Division, P.H.E. Dte. for the period from 01.09.2024 to 01.09.2025. 13.34
21 Demo Civil Office of Executive Engineer ORD/000811/2023-2024 31/10/2023 1362/HSD SUSMITA MANDAL. Work order for Supply of one motor launch on daily hire basis for use of Hasnabad Sub-Division, P.H.E. Dte. Period : 01.11.23 to 31.03.24 = 152 days. 2.26
22 Demo Civil Office of Executive Engineer ORD/000812/2023-2024 29/08/2023 1030/HSD SUSMITA MANDAL. Continuation order for one motor launch (M.V. JOYMAKALI) on daily hire basis for use of Hasnabad Sub-Division, P.H.E. Dte. Period : 01.09.23 to 31.10.23 = 61 days. 0.91
23 Demo Civil Office of Executive Engineer ORD/000813/2023-2024 28/03/2024 424/HSD SUSMITA MANDAL. Work order for Supply of one motor launch on daily hire basis for use of Hasnabad Sub-Division, P.H.E. Dte. Period : 01.04.24 to 31.08.24. 2.28
24 Demo Civil Office of Executive Engineer ORD/000809/2024-2025 19/06/2024 998/B.Ar.D. RANJIT KUMAR MANDAL Supply of 1(one) motor launch on daily hire basis for use of the Executive Engineer, Barasat Arsenic Division, PHE Dte. For the period of 1 (one) year [01.07.2024 to 30.06.2025] 12.68
25 Demo Civil Office of Executive Engineer ORD/000814/2023-2024 28/03/2024 679/B.Ar.D RANJIT KUMAR MANDAL Continuation Order for "Hiring of Power Driven Mini Launch of office of the Executive Engineer, Barasat Arsenic Division, P.H.E. Dte." for the period of 91 days (i.e. from 01.04.2024 to 30.06.2024)''. 1.04
26 Demo Civil Office of Executive Engineer ORD/000815/2023-2024 29/09/2023 2397/B.Ar.D RANJIT KUMAR MANDAL Continuation Order for "Hiring of Power Driven Mini Launch of office of the Executive Engineer, Barasat Arsenic Division, P.H.E. Dte." for the period of 183 days (i.e. from 01.10.2023 to 31.03.2024)''. 2.10
Total 1,687.84