No. of work order not mapped with AE/JE
Exception Report Showing the Status of Major Pending Works for the Divisions

Update Data
Rs. in Lakh
Sl. No. Division
Working Divisions
System Order No
System generated Order No. for the Work Order as per PHED-MIS
Order Date
Date of Issuance of the Work Order as per PHED-MIS
Memo Number
Memo no. for Work Order Provided by the Divisions as per PHED-MIS
Vendor Name
Vendor Appointed Against this Work Order as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Order Value
Value of Work as mentioned in the Work Order
12 85.9
1 Birbhum Division ORD/000234/2020-2021 03/11/2020 206 /BSSD ADIVION ENGINEERING SERVICES PVT LTD. Soil Investigation for determination of safe bearing capacity and other relevant parameters of soil for Construction of 300 Cum Over Head Reservoir (OHR) at Head Work Site under Dubrajpur Development Block under Hajrapur Piped Water Supply Scheme within 1.58
2 Birbhum Division ORD/000535/2022-2023 09/03/2023 762/BHM BHARATI CHEMICAL AND SCIENTIFIC WORKS Procurement of chemical & consumable for Birbhum District Laboratory and 5 nos PHED managed Laboratory namely Mayureswar Sub-District Lab, Patel Nagar Sub Dist-District Lab, Ahmedpur Sub-District Lab, Nalhati Sub-District Lab and Murarai Sub- District La 42.62
3 Birbhum Division ORD/000492/2022-2023 01/02/2023 287/BHM BHAGYADHAR GHOSH Laying of HDPE (PE100, PN-6 ) Pipe line at Culvert Crossing and for paralal pipe line to provide FHTC by the side of Bolpur - Nanoor Road near Datina, Fazallapur and Beluti Village under Tilutia Zone -I Water Supply Scheme within Bolpur Sub-Di 18.94
4 Birbhum Division ORD/000754/2022-2023 30/08/2022 226/BH SAKTI ENTERPRISE Continuation work order for Operation & Maintenance of Water Testing Laboratory activities of the Birbhum District Laboratory atb Suri under Birbhum Division PHE Dte. ( 01.09.2022 to 31.12.2022) 2.80
5 Birbhum Division ORD/000416/2023-2024 23/11/2023 4339/BHM RAJKUMAR DAS Sinking of 2 nos. (Two) 200 mm dia x 30 mtr deep Tubewell for Patalpur & its adjoining mouzas water supply scheme within Rajnagar Block including supply of all labour & materials under Birbhum Division, PHE Dte. 2.74
6 Birbhum Division ORD/000827/2020-2021 28/09/2020 1251/BHM HUMAYUN KABIR Laying of rising main from 8 nos Tube well to Common Manifod, Common Manifold to CWR and CWR to OHR connection under Haridaspur and it's adjoining mouzas W/S scheme under Nalhati Sub Division under Birbhum Division, P.H.E. Dte 9.03
7 Birbhum Division ORD/000431/2023-2024 31/10/2023 4180/BHM JAMSED ALI KHAN Continution work for Supply of one no. Diesel driven Motor Cab / Maxi Cab (Air Condition) on hire Basis under the Assitant Engineer (H.Q) Birbhum Division P.H.E Dte. (Period from 01.11.2023 to 30.04.2024) 0.95
8 Birbhum Division ORD/000884/2022-2023 31/05/2022 287/NSD M/S SOBHA & CO Continuation works for Preparation and submission of DPR for (Beloa) Water Supply Scheme under Nalhati-II Development Block. (from 01.06.2022 to 15.07.2022) 2.70
9 Birbhum Division ORD/000883/2022-2023 31/05/2022 286/NSD M/S SOBHA & CO Continuation works for Preparation and submission of DPR for (Hazaripur) Water Supply Scheme under Nalhati-II Development Block. ( from 01.06.2022 to 15.07.2022) 0.71
10 Birbhum Division ORD/000886/2022-2023 31/05/2022 289/NSD M/S SOBHA & CO Continuation works for Preparation and submission of DPR for (Prasadpur) Water Supply Scheme under Nalhati-II Development Block. (from 04.06.2022 to 18.07.2022) 1.09
11 Birbhum Division ORD/000887/2022-2023 31/05/2022 290/NSD M/S SOBHA & CO Continuation works for Preparation and submission of DPR for (Nawapara) Water Supply Scheme under Nalhati-II Development Block. (from 04.06.2022 to 18.07.2022) 0.50
12 Birbhum Division ORD/000885/2022-2023 31/05/2022 288/NSD M/S SOBHA & CO Continuation works for Preparation and submission of DPR for (Atkulia) Water Supply Scheme under Nalhati-II Development Block. (from 01.06.2022 to 15.07.2022) 2.25
Total 85.9