Sl. No. | Division
Working Divisions
|
System Order No
System generated Order No. for the Work Order as per PHED-MIS
|
Order Date
Date of Issuance of the Work Order as per PHED-MIS
|
Memo Number
Memo no. for Work Order Provided by the Divisions as per PHED-MIS
|
Vendor Name
Vendor Appointed Against this Work Order as per PHED-MIS
|
Work Name
Name of the Work as per the Issued Work Order
|
Order Value
Value of Work as mentioned in the Work Order
|
---|---|---|---|---|---|---|---|
11 | 84.95 | ||||||
1 | Birbhum Division | ORD/000234/2020-2021 | 03/11/2020 | 206 /BSSD | ADIVION ENGINEERING SERVICES PVT LTD. | Soil Investigation for determination of safe bearing capacity and other relevant parameters of soil for Construction of 300 Cum Over Head Reservoir (OHR) at Head Work Site under Dubrajpur Development Block under Hajrapur Piped Water Supply Scheme within | 1.58 |
2 | Birbhum Division | ORD/000535/2022-2023 | 09/03/2023 | 762/BHM | BHARATI CHEMICAL AND SCIENTIFIC WORKS | Procurement of chemical & consumable for Birbhum District Laboratory and 5 nos PHED managed Laboratory namely Mayureswar Sub-District Lab, Patel Nagar Sub Dist-District Lab, Ahmedpur Sub-District Lab, Nalhati Sub-District Lab and Murarai Sub- District La | 42.62 |
3 | Birbhum Division | ORD/000492/2022-2023 | 01/02/2023 | 287/BHM | BHAGYADHAR GHOSH | Laying of HDPE (PE100, PN-6 ) Pipe line at Culvert Crossing and for paralal pipe line to provide FHTC by the side of Bolpur - Nanoor Road near Datina, Fazallapur and Beluti Village under Tilutia Zone -I Water Supply Scheme within Bolpur Sub-Di | 18.94 |
4 | Birbhum Division | ORD/000754/2022-2023 | 30/08/2022 | 226/BH | SAKTI ENTERPRISE | Continuation work order for Operation & Maintenance of Water Testing Laboratory activities of the Birbhum District Laboratory atb Suri under Birbhum Division PHE Dte. ( 01.09.2022 to 31.12.2022) | 2.80 |
5 | Birbhum Division | ORD/000416/2023-2024 | 23/11/2023 | 4339/BHM | RAJKUMAR DAS | Sinking of 2 nos. (Two) 200 mm dia x 30 mtr deep Tubewell for Patalpur & its adjoining mouzas water supply scheme within Rajnagar Block including supply of all labour & materials under Birbhum Division, PHE Dte. | 2.74 |
6 | Birbhum Division | ORD/000827/2020-2021 | 28/09/2020 | 1251/BHM | HUMAYUN KABIR | Laying of rising main from 8 nos Tube well to Common Manifod, Common Manifold to CWR and CWR to OHR connection under Haridaspur and it's adjoining mouzas W/S scheme under Nalhati Sub Division under Birbhum Division, P.H.E. Dte | 9.03 |
7 | Birbhum Division | ORD/000884/2022-2023 | 31/05/2022 | 287/NSD | M/S SOBHA & CO | Continuation works for Preparation and submission of DPR for (Beloa) Water Supply Scheme under Nalhati-II Development Block. (from 01.06.2022 to 15.07.2022) | 2.70 |
8 | Birbhum Division | ORD/000883/2022-2023 | 31/05/2022 | 286/NSD | M/S SOBHA & CO | Continuation works for Preparation and submission of DPR for (Hazaripur) Water Supply Scheme under Nalhati-II Development Block. ( from 01.06.2022 to 15.07.2022) | 0.71 |
9 | Birbhum Division | ORD/000886/2022-2023 | 31/05/2022 | 289/NSD | M/S SOBHA & CO | Continuation works for Preparation and submission of DPR for (Prasadpur) Water Supply Scheme under Nalhati-II Development Block. (from 04.06.2022 to 18.07.2022) | 1.09 |
10 | Birbhum Division | ORD/000887/2022-2023 | 31/05/2022 | 290/NSD | M/S SOBHA & CO | Continuation works for Preparation and submission of DPR for (Nawapara) Water Supply Scheme under Nalhati-II Development Block. (from 04.06.2022 to 18.07.2022) | 0.50 |
11 | Birbhum Division | ORD/000885/2022-2023 | 31/05/2022 | 288/NSD | M/S SOBHA & CO | Continuation works for Preparation and submission of DPR for (Atkulia) Water Supply Scheme under Nalhati-II Development Block. (from 01.06.2022 to 15.07.2022) | 2.25 |
Total | 84.95 |