Sl. No. | Division
Working Divisions
|
System Order No
System generated Order No. for the Work Order as per PHED-MIS
|
Order Date
Date of Issuance of the Work Order as per PHED-MIS
|
Memo Number
Memo no. for Work Order Provided by the Divisions as per PHED-MIS
|
Vendor Name
Vendor Appointed Against this Work Order as per PHED-MIS
|
Work Name
Name of the Work as per the Issued Work Order
|
Order Value
Value of Work as mentioned in the Work Order
|
---|---|---|---|---|---|---|---|
103 | 3,529.09 | ||||||
1 | Burdwan Division | ORD/000554/2020-2021 | 08/10/2020 | 891/BSD | DUBE ENTERPRISE | Laying of interconnection o both the Pump No.-1 & 2 with by-pass arrangement from Over Head Reservoir for Pubar piped water supply scheme within Ausgram-I Block under Burdwan Division, PHE Dte. | 3.49 |
2 | Burdwan Division | ORD/000483/2020-2021 | 08/10/2020 | 893/BSD | SUJAY KUMAR RAY | Approach road of Head works site of Pubar piped water supply scheme at Ausgram-I block under Burdwan Division, PHE Dte. (Tr No.-534/BWD/20-21) | 3.85 |
3 | Burdwan Division | ORD/000756/2020-2021 | 31/12/2020 | 1229/BSD | DHIRENDRANATH SOM | Operation & maintenance of distribution system and rising main pipeline (CI/DI/AC/UPVC) of Orgram (Zone-I) water supply scheme under Burdwan Division, PHE Dte.[Period from 01/01/2021 to 30/06/2021] | 1.55 |
4 | Burdwan Division | ORD/000730/2020-2021 | 25/02/2021 | 268/BSD | ALAKA GHOSH | Engagement of Laboratory Personnel i.e. Chemist/Bacteriologist/Lab Assistant/Sampling Assistant and Computer/Data Entry Operator for Burdwan District Laboratory under Burdwan Division, PHE Dte.(Period from 01/03/2021 to 31/08/2021) | 4.68 |
5 | Burdwan Division | ORD/000773/2020-2021 | 26/03/2021 | 508/BSD | CLIFFORD FACILITY SERVICES PVT.LTD. | Continuation work order for engagement of Laboratory personnel (Chemist/Bacteriologist and Lab Assistant) in 2 Nos. Sub-District Laboratories within Burdwan Sub-Division under Burdwan Division, PHE Dte. [Period From 01/04/2021 to 30/06/2021] | 1.57 |
6 | Burdwan Division | ORD/000196/2021-2022 | 09/06/2021 | 686/BSD | DHIRENDRANATH SOM | Re-alignment of UPVC pipeline at different damage section due to construction of culvert and pilling by PWD of Orgram (Zone-I & II) piped water supply scheme at Bhatar Block under Burdwan Division, PHE Dte. [Gr.-D] | 1.57 |
7 | Burdwan Division | ORD/000249/2021-2022 | 01/09/2021 | PHE/2060/1L-72/19 | L.A. COLLECTOR, PURBA BARDHAMAN | Direct purchase of land admeasuring 1.06 acre at an estimated cost of Rs. 1,08,89,123/- for 03 Nos piped water supply scheme in 1) Madhabpur, 2) Palasan & 3) Kashipur & its adjoining mouzas in the district of Purba Bardhaman under Burdwan Division, PHE D | 108.89 |
8 | Burdwan Division | ORD/000250/2021-2022 | 25/11/2021 | PHE/2792/1L-47/19 | L.A. COLLECTOR, PURBA BARDHAMAN | Direct purchase of 01 No. plot of land measuring 0.025 acre at an estimated cost of Rs. 2,41,250/- for implementing of Sultanpur water supply scheme in Block-Kalna-I in the district of Purba Bardhaman under Burdwan Division, PHE Dte. | 2.41 |
9 | Burdwan Division | ORD/000314/2021-2022 | 03/08/2021 | 1009/BSD | SUKANTA DEY | Land development at ditch portion at Gramdihi OHR site under Gramdihi water supply scheme at Bhatar Development Block under Burdwan Sub-Division under Burdwan Division, PHE Dte.[Gr.-B] | 1.01 |
10 | Burdwan Division | ORD/000301/2021-2022 | 23/11/2021 | PHE/2749/1L-46/19 | L.A. COLLECTOR, PURBA BARDHAMAN | Direct purchase of 01 No. plot of land measuring 0.04 acre at an estimated cost of Rs. 550229.00 for implementation of Uttar Radhakantapur piped water supply scheme in the district of Purba Bardhaman under Burdwan Division, PHE Dte. | 5.50 |
11 | Burdwan Division | ORD/000364/2021-2022 | 07/01/2022 | 119/BWD | SUNANDA ENVIROMENTAL INTERNATIONAL PVT LTD. | Supply and delivery of portable multi-parameter water quality testing device including training on operation of the device in addition to online entry, management, analysis and reporting of water quality test results in State Water Quality Dashboard and I | 20.46 |
12 | Burdwan Division | ORD/000422/2021-2022 | 19/01/2022 | PHE/128/1L-7/20 | L.A. COLLECTOR, PURBA BARDHAMAN | Direct purchase of land for implementing of Alipur water supply scheme under Burdwan Division, PHE Dte. (Area-0.09 Acre) | 5.03 |
13 | Burdwan Division | ORD/000408/2021-2022 | 31/08/2021 | 1156/BSD | ALAKA GHOSH | Engagement of laboratory personnels, i.e. Chemist (One Person). Bacteriologist (One Person), Laboratory Assistant (One Person), Sampling Assistant (One Person) and Computer Operator /Data Entry Operator (One Person) for Burdwan District Laboratory under B | 4.69 |
14 | Burdwan Division | ORD/000339/2021-2022 | 30/06/2021 | 830/BSD | CLIFFORD FACILITY SERVICES PVT.LTD. | Engagement of Laboratory personnel (Chemist/Bacteriologist and Lab Assistant) in 02 Nos. Sub-District Laboratories within Burdwan Sub-Division under Burdwan Division PHE Dte. [Period from 01/07/21 to 31/12/21][Gr.-M] | 3.14 |
15 | Burdwan Division | ORD/000646/2021-2022 | 28/02/2022 | 360/BSD | ALAKA GHOSH | Engagement of laboratory personnels i.e. Chemist (One Person), Bacteriologist (One Person), Laboratory Assistant (One Person) , Sampling Assistant (One Person) and Computer Operator/Data Entry Operator (One Person) for Burdwan District Laboratory under B | 4.69 |
16 | Burdwan Division | ORD/000081/2022-2023 | 20/05/2022 | 815/BSD | S.S. CONSTRUCTION | Trail Run for pipe line of Burdwan University (Tarabag zone-I & II , Golapbag zone-I & II ,Hostel campas zone) and interconnection of new tube well near Buiseness Adminstrative Building water supply schemes under Burdwan Division,PHE Dte for the period o | 4.76 |
17 | Burdwan Division | ORD/000757/2021-2022 | 18/08/2021 | 1088/BSD | DEBASHISH ENTERPRISE | Repairing, renovation, color, dismantling, plaster, aluminium works, sanitary works of Burdwan District Laboratory Room within Burdwan Division, PHE Dte.[Gr.-A] | 4.54 |
18 | Burdwan Division | ORD/000109/2022-2023 | 16/06/2022 | 981/BSD | PRATIVA CONSTRUCTION | Laying of 100 mm dia D.I Pipe for Road widening from 4 lane to 6 lane of NH2 at chainage 599+654 & 599+154 at Jougram Water supply within Jamalpur Block,under Burdwan Division,PHE Dte". Group : B. | 2.97 |
19 | Burdwan Division | ORD/000424/2022-2023 | 30/06/2022 | 1129/BSD | CLIFFORD FACILITY SERVICES PVT.LTD. | Engagement of Laboratory personnel (Chemist/Bacteriologist and Lab Assistant) in 2 Sub District Laboratories within Burdwan Sub-Division under Burdwan Division, P.H.E. Dte., Purba Bardhaman for the period from 01-07-2022 to 31-12-2022. Sl.No.69. | 3.33 |
20 | Burdwan Division | ORD/000303/2022-2023 | 18/08/2022 | 3598/BWD | M/S LAXMI ENTERPRISE | Supply & Delivery of Chemicals, reagents and consumables for 14(Fourteen) laboratories under Burdwan Division, P.H.E. Dte. | 26.61 |
21 | Burdwan Division | ORD/000508/2022-2023 | 24/05/2022 | 877/BSD | ALAKA GHOSH | Sanction order for deposit of Final assessment fee for NABL Accreditation of Burdwan District Laboratory under Burdwan Division, PHE Dte. | 0.25 |
22 | Burdwan Division | ORD/000840/2021-2022 | 29/07/2021 | 983/BSD | ALAKA GHOSH | Maintenance charges of Burdwan District Laboratory under Burdwan Division PHE Dte. [Period from 01/08/2021 to 31/07/2022] | 0.97 |
23 | Burdwan Division | ORD/000983/2020-2021 | 13/11/2020 | 1031/BSD | ALAKA GHOSH | Survey and collection of data through mobile application regarding availability of drinking water, sanitation, facilities and other parameters in Primary & Upper Primary schools, Anganwari Centres under Burdwan-I, Burdwan-II, Raina-II, Memari-I, Memari-II | 3.27 |
24 | Burdwan Division | ORD/000557/2022-2023 | 26/08/2022 | 1489/BSD | ALAKA GHOSH | Continuation Work Order for Engagement of Laboratory Personnel i.e. Chemist (One Person), Bacteriologist (One Person), Laboratory Assistant(One Person), Sampling Assistant (One Person) and Computer Operator/Data Entry Operator (One Person) for Burdwan Dis | 3.14 |
25 | Burdwan Division | ORD/000505/2022-2023 | 28/07/2022 | 1328/BSD | ALAKA GHOSH | Maintenance charges of Burdwan District Laboratory under Burdwan Division,PHE Dte (Period from 01.08.2022 to 31.12.2022). Gr.A. | 0.37 |
26 | Burdwan Division | ORD/000506/2022-2023 | 17/06/2022 | 1005/BSD | ALAKA GHOSH | Sanction order for deposit of annual accreditation fee for NABL Accreditation of Burdwan District Laboratory under Burdwan Division, PHE Dte. | 0.28 |
27 | Burdwan Division | ORD/000642/2022-2023 | 30/12/2022 | 2328/BSD | ALAKA GHOSH | Engagement of laboratory personnel i.e. Chemist (One Person), Bacteriologist (One Person), Laboratory Assistant (One Person), Sampling Assistant (One Person) for Burdwan District Laboratory under Burdwan Division P.H.E Dte. at PHE Complex, Nababhat, Purba | 0.84 |
28 | Burdwan Division | ORD/000643/2022-2023 | 30/12/2022 | 2329/BSD | ALAKA GHOSH | Engagement of laboratory personnel i.e. AAS Operator (One Person) and Computer Operator/Data Entry Operator (One Person) for Burdwan District Laboratory under Burdwan Division P.H.E Dte. at PHE Complex, Nababhat, Purba Bardhaman, For the period from 01.01 | 0.40 |
29 | Burdwan Division | ORD/000644/2022-2023 | 02/08/2022 | 1350-A/BSD | MAJILA ENTERPRISE | Extension of pipeline for GHOSH Piped Water Supply Scheme at Mondaljona [6 No's], Kashirampur [8 No's],Total 14 No's FHTC Work for Sajal Gram (As per Field Verification Report for Har Ghar Jal Certification within Memari-I Block including leftout husehol | 0.97 |
30 | Burdwan Division | ORD/000650/2022-2023 | 04/08/2022 | 1364-A/BSD | M/S ANAND CONSTRUCTION | Extension of pipeline for providing FHTC for CHAKSHANJADI Piped Water Supply Scheme at Chalbalpur Habitation for Sajal Gram (As per Field Verifcation Report duly singned by Pradhan for Har Ghar Jal Certification) within Jamalpur Block under Burdwan Divisi | 0.96 |
31 | Burdwan Division | ORD/000649/2022-2023 | 03/08/2022 | 1361-A/BSD | M/S ANAND CONSTRUCTION | Extension of pipeline including providing providing FHTC for CHAKSHANJADI Piped Water Supply Scheme at Chalbalpur Habitation for Sajal Gram (As per Field Verification Report duly signed by Pradhan for Har Ghar Jal Certification within Jamalpur Block incl | 0.95 |
32 | Burdwan Division | ORD/000718/2022-2023 | 24/01/2023 | 333/BWD | SRIJAN ECOLOGICAL UPLIFTMENT PVT LTD. | Continuation work order for Preparation of piped network system & design the same including Route Survey using DGPS & all related field work for technical data and JJM compliant data collection preparation and supply of Geo reference drawing (CAD-GIS) lay | 170.00 |
33 | Burdwan Division | ORD/000725/2022-2023 | 24/01/2023 | 334/BWD | MARS PLANNING AND ENGINEERING SERVICES PVT LTD. | Continuation work for Preparation of piped network system & design the same including Route Survey using DGPS & all related field work for technical data and JJM compliant data collection preparation and supply of Geo reference drawing (CAD-GIS) layout of | 215.00 |
34 | Burdwan Division | ORD/000731/2022-2023 | 27/01/2023 | 342/BWD | VENKATESHWARA ENTERPRISES | Continuation work for Preparation of piped network system & design the same including Route Survey using DGPS & all related field work for technical data and JJM compliant data collection preparation and supply of Geo reference drawing (CAD-GIS) layout of | 27.00 |
35 | Burdwan Division | ORD/000836/2022-2023 | 27/02/2023 | 337/BSD | ALAKA GHOSH | Continuation Work Order for engagement of laboratory personnel i.e. AAS Operator (One Person) and Computer Operator/Data Entry Operator (One Person) for Burdwan District Laboratory under Burdwan Division P.H.E Dte. at PHE Complex, Nababhat, Purba Bardhama | 0.40 |
36 | Burdwan Division | ORD/000837/2022-2023 | 27/02/2023 | 336/BSD | ALAKA GHOSH | Continuation Work Order for engagement of laboratory personnel i.e. Chemist (One Person), Bacteriologist (One Person), Laboratory Assistant (One Person), Sampling Assistant (One Person) for Burdwan District Laboratory under Burdwan Division P.H.E Dte. at | 0.84 |
37 | Burdwan Division | ORD/000805/2022-2023 | 30/03/2023 | 1564/BWD | M/S NATIONAL CONSTRUCTION | Construction of 350 cum capacity 20 Mtr. staging height RCC Over Head Reservoir including pipe connection and cost of pipes, specials for AMARUN Zone-I & it's adjoining mouzas W/S. scheme Burdwan Division, P.H.E. Dte.Ref. Drawing No.PC-I/OHR/11/2012 (Shee | 95.54 |
38 | Burdwan Division | ORD/000781/2022-2023 | 01/02/2023 | 121/BSD | ALAKA GHOSH | Continuation Work Order for engagement of laboratory personnel i.e. Chemist (One Person), Bacteriologist (One Person), Laboratory Assistant (One Person) , Sampling Assistant (One Person) for Burdwan District Laboratory under Burdwan Division P.H.E Dte. | 0.84 |
39 | Burdwan Division | ORD/000850/2022-2023 | 08/08/2022 | 1393-A/BSD | ROY CONSTRUCTION | Extension of pipeline including FHTC for SIPTAI Piped Water Supply Scheme at Siptai (42 Nos) Habitation for Sajal Gram (As per field verification report duly signed by Pradhan for Har Ghar Jal Certification) within Jamalpur Block under Burdwan Division, | 0.97 |
40 | Burdwan Division | ORD/000851/2022-2023 | 08/08/2022 | 1394-A/BSD | ROY CONSTRUCTION | Extension of pipeline including providing FHTC for Siptai Piped Water Supply Scheme at Ilampur[30 No's],Habitation for Sajal Gram (As per Sajal Gram(As per Field Verification Report duly signed by Pradhan for Har Ghar Jal Certification)within Jamalpur Bl | 0.96 |
41 | Burdwan Division | ORD/000769/2022-2023 | 21/03/2023 | 504/BSD | JYOTI ENTERPRISE | Construction of Pump House cum chlorine room without sanitary and water supply arrangement at Tube Well Site to departmental drawing no-PHE/BD/P.H/DRG/02/DEC-17(Size 3.60 mtr x 3.00 mtr room) for SAGRAI its Adjoining Mouza W/S Scheme, Block -Khandaghosh | 3.50 |
42 | Burdwan Division | ORD/000782/2022-2023 | 01/02/2023 | 122/BSD | ALAKA GHOSH | Continuation Work Order for ¿engagement of laboratory personnels i.e. AAS Operator (One Person) and Computer Operator/Data Entry Operator (One Person) for Burdwan District Laboratory under Burdwan Division P.H.E Dte. at PHE Complex, Nababhat, Purba Bardha | 0.40 |
43 | Burdwan Division | ORD/000849/2022-2023 | 08/08/2022 | 1392-A/BSD | ROY CONSTRUCTION | Extension of pipeline including FHTC for SIPTAI Piped Water Supply Scheme at Pirijpur (40 Nos) Habitation for Sajal Gram (As per field verification report duly signed by Pradhan for Har Ghar Jal Certification) within Jamalpur Block under Burdwan Division | 0.95 |
44 | Burdwan Division | ORD/000883/2022-2023 | 30/03/2023 | 599/BSD | ALAKA GHOSH | Continuation Work Order for Engagement of laboratory personnel i.e. Chemist (One Person), Bacteriologist (One Person), Laboratory Assistant (One Person) , Sampling Assistant (One Person) for Burdwan District Laboratory under Burdwan Division P.H.E Dte. | 0.84 |
45 | Burdwan Division | ORD/000884/2022-2023 | 30/03/2023 | 600/BSD | ALAKA GHOSH | Continuation Work Order for Engagement of laboratory personnel i.e. AAS Operator (One Person) and Computer Operator/Data Entry Operator (One Person) for Burdwan District Laboratory under Burdwan Division P.H.E Dte. at PHE Complex, Nababhat, Purba Bardhama | 0.40 |
46 | Burdwan Division | ORD/000084/2023-2024 | 10/05/2023 | 2114/BWD | BARDHAMAN AQUA ENGINEERING | Augmentation of RAHATPUR PWSS to accommodate FHTC, Laying Distribution System, Laying Rising Main, under Jal Jeevan Mission of Purbasthali - I Block, Purba Burdwan District under Burdwan Division, PHE. Dte. | 18.67 |
47 | Burdwan Division | ORD/000151/2023-2024 | 30/05/2023 | 2424/BWD | KOUSIK MALLICK | Sinking of 250 X 150mm dia Tube Well 150 mtr. Depth by D.R. Rig method using UPVC pipe (CD) and UPVC Deep Well Screen (RDS) for Aug. of BAIDYAPUR (Z-I) PWSS, Block - Kalna - II and NANDAI PWSS, Block - Kalna - I Piped Water Supply Scheme, Dist - Purba Ba | 19.84 |
48 | Burdwan Division | ORD/000160/2023-2024 | 01/06/2023 | 2575/BWD | TULIP ENGINEERS CO-OPERATIVE SOCIETY LTD. | Interconnection in distribution system from OHR to in between 1st and 2nd Tube Well site for smooth functioning of FHTC work of MAJHERGRAM W/S Scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. | 22.54 |
49 | Burdwan Division | ORD/000162/2023-2024 | 31/05/2023 | 2450/BWD | DULAL MAJUMDER | Engagement of Laboratory personnel (Chemist/Bacteriologist and Lab Assistant) including maintenance in 3 Nos. Sub District Laboratories within Headquarters under Burdwan Division, PHE Dte., Purba Bardhaman. [Period For Six Months i.e. 01.06.2023 to 30.11. | 11.02 |
50 | Burdwan Division | ORD/000097/2023-2024 | 03/05/2023 | 810/BSD | SUPRIYA RAY | Laying of Interconnection of 4th Tube well site of MAHESHDANGA Piped Water Supply Scheme within Burdwan Division,PHE Dte. | 2.95 |
51 | Burdwan Division | ORD/000165/2023-2024 | 27/04/2023 | 777/BSD | ALAKA GHOSH | Continuation work order for engagement of laboratory personnels i.e. Chemist (One Person), Bacteriologist (One Person), Laboratory Assistant (One Person), Sampling Assistant (One Person) for Burdwan District Laboratory under Burdwan Division P.H.E Dte. a | 0.84 |
52 | Burdwan Division | ORD/000166/2023-2024 | 27/04/2023 | 778/BSD | ALAKA GHOSH | Continuation work order for engagement of laboratory personnel i.e. AAS Operator (One Person) and Computer Operator/Data Entry Operator (One Person) for Burdwan District Laboratory under Burdwan Division P.H.E Dte. at PHE Complex, Nababhat, Purba Bardhama | 0.40 |
53 | Burdwan Division | ORD/000087/2023-2024 | 10/05/2023 | 2153/BWD | BHARATI CHEMICAL & SCIENTIFIC WORKS | Supply & Delivery of Chemicals, reagents and consumables for 14(Fourteen) laboratories under Burdwan Division, P.H.E. Dte. | 30.43 |
54 | Burdwan Division | ORD/000217/2023-2024 | 28/04/2023 | 792/BSD | CLIFFORD FACILITY SERVICES PVT.LTD. | Engagement of Laboratory personnel (Chemist/Bacteriologist and Lab Assistant)in 2 Sub District Laboratories within Burdwan Sub-Division under Burdwan Division, P.H.E. Dte., Purba Bardhaman for the period from 01-05-2023 to 31-05-2023 | 0.52 |
55 | Burdwan Division | ORD/000163/2023-2024 | 31/05/2023 | 2451/BWD | DULAL MAJUMDER | Engagement of Laboratory personnel (Chemist/Bacteriologist and Lab Assistant) including maintenance in 2 Nos. Sub District Laboratories within Burdwan Sadar Sub Division under Burdwan Division, PHE Dte., Purba Bardhaman. [Period For Six Months i.e. 01.06. | 6.99 |
56 | Burdwan Division | ORD/000351/2023-2024 | 12/07/2023 | 1478/BSD | CARTO | Preparation and Submission of DPR for Augmentation of Ruppur PWSS under Jamalpur Development Block under Burdwan Division, P.H.E Dte.[2nd Call] | 0.78 |
57 | Burdwan Division | ORD/000219/2023-2024 | 08/06/2023 | 2710/BWD | AUXILIARY TUBE WELL DRILLERS | Sinking of 250 X 150mm dia Tube Well 150 mtr. Depth by D.R. Rig method using UPVC pipe (CD) and UPVC Deep Well Screen (RDS) for Aug. of DHATRIGRAM Piped Water Supply Scheme, Block - Kalna - I, Dist - Purba Bardhaman under Burdwan Division, PHE Dte. [For | 19.76 |
58 | Burdwan Division | ORD/000201/2023-2024 | 08/06/2023 | 2704/BWD | TULIP ENGINEERS CO-OPERATIVE SOCIETY LTD. | Sinking of 300 X 200mm dia Tube Well 150 mtr. Depth by D.R. Rig method using UPVC pipe (CD) and UPVC Deep Well Screen (RDS) for 3RD TW site of MADHABPUR (Z-I) W/S Scheme under Jamalpur Block within Burdwan Sub-Division, PHE Dte. | 13.26 |
59 | Burdwan Division | ORD/000344/2023-2024 | 14/07/2023 | 3033/BWD | ANWESHA CONSTRUCTION | Providing FHTC for 100% coverage at Muidipur, Ujirpur, Reshalatpur, Kora, Siali & Amarpur Habitation (Village) for SIALI piped W/S Scheme, Jamalpur Dev. Block under Burdwan Division, PHE Dte. | 31.38 |
60 | Burdwan Division | ORD/000156/2023-2024 | 31/05/2023 | 2449/BWD | ALAKA GHOSH | Engagement of laboratory personnel i.e. Chemist (One Person), AAS Operator (One person) Bacteriologist (One Person), Laboratory Assistant (One Person), Sampling Assistant (One Person) and Computer Operator/Data Entry Operator (One Person) for Burdwan Dist | 7.40 |
61 | Burdwan Division | ORD/000101/2023-2024 | 18/05/2023 | 2259/BWD | MUKHERJEE ENTERPRISE | Providing FHTC for 100% coverage at Baidyabatipur, Tilkuria, Mahishgaria, Narayanpur & Mathurapur village (Mouza) for MAHISHGARIA Piped W/S Scheme, Jamalpur Dev. Block under Burdwan Division, PHE Dte. | 11.92 |
62 | Burdwan Division | ORD/000365/2023-2024 | 17/07/2023 | 1527/BSD | MEASURE LAND | Preparation and Submission of DPR for Augmentation of GHOSH PWSS under Memari-I Development Block under Burdwan Division, P.H.E Dte.[2nd Call] | 0.78 |
63 | Burdwan Division | ORD/000139/2023-2024 | 28/04/2023 | 788/BSD | GHOSH ENTERPRISE | Renovation of District Laboratory with meeting hall at Nababhat P.H.E Complex within RWS Sub-Division under Burdwan Division, PHE Dte. | 0.94 |
64 | Burdwan Division | ORD/000140/2023-2024 | 28/04/2023 | 789/BSD | GHOSH ENTERPRISE | Extension of CIDF/DI Pipes with specials within command area of Balarampur piped W/S Scheme at Shalim Danga Sabgi Bazar,,Jamalpur Development Block under Burdwan Division,PHE Dte. [2nd Call]. | 0.32 |
65 | Burdwan Division | ORD/000510/2023-2024 | 22/05/2023 | 499/KTS | M/S MUNMUN DEY | Supply of 1 (one) No. Inspection Vehicle for different JJM Related Works as and when required including supply of driver and fuels (Minimum 8 Hours of duty) under Katwa Sub-Division within Burdwan Division, P.H.E. Dte. Consider 96.00 Km run per Day.(Sl N | 0.90 |
66 | Burdwan Division | ORD/000588/2023-2024 | 28/08/2023 | 3747/BWD | MAHALAXMI CONSTRUCTION | Augmentation of KULTI PWSS to accommodate FHTC, Laying Distribution System, Laying Rising Main, under Jal Jeevan Mission of Kalna - II Block, Purba Burdwan District under Burdwan Division, PHE.Dte. | 21.92 |
67 | Burdwan Division | ORD/000608/2023-2024 | 01/09/2023 | 3812/BWD | SUJAY KUMAR RAY | Repairing of RCC Elevated Reservoir (Capacity 140 Cum) of SRIDHARPUR Piped Water Supply Scheme under Burdwan Sub-Division within Burdwan Division P.H.E. Dte. | 7.41 |
68 | Burdwan Division | ORD/000653/2023-2024 | 13/09/2023 | 4076/BWD | SSPR VALVE MANUFACTURING PVT LTD. | Supply & delivery of different dia. MJ Coller for FHTC as well as smooth running of different W/S. Schemes under Burdwan Division, P.H.E. Dte. [i.e. (1) Magra PWSS, Memari-I Block, (2) Kuchut PWSS, Memari - II Block, (3) Khundkuri PWSS, Khandaghosh Block | 20.63 |
69 | Burdwan Division | ORD/000666/2023-2024 | 20/09/2023 | 4162/BWD | M/S PALASH BISWAS | Construction of switch rooms & Rising main at different TW site for ALIPUR Piped Water Supply Scheme under Memari - I Block, District:- Purba-Bardhaman under Burdwan Division, PHE. Dte. | 8.12 |
70 | Burdwan Division | ORD/000593/2023-2024 | 29/08/2023 | 3771/BWD | DURGAPADA MONDAL | Road restoration work due to FHTC & extension pipeline for different village (Rayan, Naryandighi, Nari Das Para, Krishnapur, Nari & Sukantapally) under RAYAN Piped W/S. Scheme at Burdwan - I Dev. Block under Burdwan Division, PHE. Dte. | 5.97 |
71 | Burdwan Division | ORD/000674/2023-2024 | 21/09/2023 | 4175/BWD | M/S F.S. ENTERPRISE | Construction of boundary wall including land development at 2nd Tube well site of MAHINDAR Piped Water Supply Scheme in Jamalpur Block under Burdwan Division, PHE Dte. (Length - 60 Mtr.). | 5.14 |
72 | Burdwan Division | ORD/000692/2023-2024 | 05/10/2023 | 4389/BWD | MANASH GHOSH | Different works related (sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of different capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land | 1,343.97 |
73 | Burdwan Division | ORD/000698/2023-2024 | 27/09/2023 | 341/RWS | KHUSI BHAKAT | Name of work:- Sample collection charges of Burdwan-I, Galsi-II and Bhatar Block through Agencies where facilitators are unavailable/inactive related to Water Quality Monitoring & Surveillance under JJM (Scheme code: SM/13134) [Gr. B] | 0.95 |
74 | Burdwan Division | ORD/000697/2023-2024 | 27/09/2023 | 340/RWS | GHOSH ENTERPRISE | Name of work:- Sample collection charges of Raina-I, Raina-II and Khandaghosh Block through Agencies where facilitators are unavailable/inactive related to Water Quality Monitoring & Surveillance under JJM (Scheme code: SM/13134) [Gr. A] | 0.95 |
75 | Burdwan Division | ORD/000699/2023-2024 | 27/09/2023 | 342/RWS | ALAKA GHOSH | Name of work:- Sample collection charges of Mongalkote, Ketugram-I & II and Katwa-II Block through Agencies where facilitators are unavailable/inactive related to Water Quality Monitoring & Surveillance under JJM (Scheme code: SM/13134) [Gr. C] | 0.95 |
76 | Burdwan Division | ORD/000700/2023-2024 | 27/09/2023 | 343/RWS | GHOSH ENTERPRISE | Name of work:- Sample collection charges of Jamalpur, Memari-I and Memari-II Block through Agencies where facilitators are unavailable/inactive related to Water Quality Monitoring & Surveillance under JJM (Scheme code: SM/13134) [Gr. D] | 0.95 |
77 | Burdwan Division | ORD/000708/2023-2024 | 11/10/2023 | 4481/BWD | LOKNATH ENTERPRISE | Construction of Pump House cum switch room (5.40 mtr x 3.60 mtr) with sanitary arrangement (as per drawing no. PHE/SE/CC/PH/DWG-01/2022-2023) at GANGANANDAPUR Water Supply Scheme within Kalna Sub-Divn. under Burdwan Division, PHE Dte. Dist.-Purba Bardhama | 6.31 |
78 | Burdwan Division | ORD/000677/2023-2024 | 21/09/2023 | 4177/BWD | M/S SANKHA SUVRA ROY | Construction of balance portion of boundary wall including land development at 1st Tube well site of SHURA Zone I Piped Water Supply Scheme in Jamalpur Block under Burdwan Division, PHE Dte. (Length - 55 Mtr.). | 6.70 |
79 | Burdwan Division | ORD/000722/2023-2024 | 05/09/2023 | 3925/BWD | MAA BHABANI CONSTRUCTION | Laying of HDPE Pipeline from 4th Number Pump House to main distribution system for ABUJHATI Piped W/S Scheme, Jamalpur Dev. Block under Burdwan Division, PHE Dte. | 21.04 |
80 | Burdwan Division | ORD/000701/2023-2024 | 27/09/2023 | 344/RWS | AQUA SOLUTIONS ENTERPRISE | Name of work:- Sample collection charges of Monteswar, Kalna-I and Purbasthali -II Block through Agencies where facilitators are unavailable/inactive related to Water Quality Monitoring & Surveillance under JJM (Scheme code: SM/13134) [Gr. E] | 0.95 |
81 | Burdwan Division | ORD/000738/2023-2024 | 30/10/2023 | 831/AE/HQ | ISHAN CONSTRUCTION | Designing, Making and Erection of Sign Board for SAJAL GRAM in Puriha Village, Khandaghosh Block within Taraposh PWSS under Burdwan Division, PHE Dte. (5 Nos Board) | 0.76 |
82 | Burdwan Division | ORD/000730/2023-2024 | 30/10/2023 | 823/AE/HQ | ISHAN CONSTRUCTION | Designing, Making and Erection of Sign Board for SAJAL GRAM in Kayrapur Village, Ausgram-I Block within Kayrapur PWSS under Burdwan Division, PHE Dte. (5 Nos Board) | 0.76 |
83 | Burdwan Division | ORD/000754/2023-2024 | 01/11/2023 | 4687/BWD | M/S KHAN CHOWDHURY BROTHERS | Construction of 500 cu.m. capacity 20 mtr staging height RCC Over Head Reservoir including Pipe connection under ANTPARA Piped W/S. Scheme, within Jamalpur Block under Burdwan Division, P.H.E Dte._2ND CALL. | 134.36 |
84 | Burdwan Division | ORD/000791/2023-2024 | 07/11/2023 | 870/AE/HQ | PAPRI HAZRA | Designing, Making and Erection of Sign Board for SAJAL GRAM in Sankhai Village, Ketugram - II Block within Uddharanpur PWSS under Burdwan Division, PHE Dte. (5 Nos Board) | 0.76 |
85 | Burdwan Division | ORD/000920/2022-2023 | 17/10/2022 | 4636/BWD | ENVIROTECH SOLUTIONS | Continuation Work for Preparation & Submission of DPR for New Water Supply Scheme under KETUGRAM - I Development Block under Burdwan Division, P.H.E. Dte. | 17.27 |
86 | Burdwan Division | ORD/000803/2023-2024 | 08/11/2023 | 4808/BWD | NATIONAL CONSTRUCTION | KHANPUR Piped Water Supply Scheme with sinking of Tube-well, LDS, Rising Main, FHTC, Construction of 400 cum capacity RCC OHR with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and la | 707.70 |
87 | Burdwan Division | ORD/000845/2023-2024 | 28/07/2023 | 1759/BSD | MD HASIN | Supply of Inspection Vehicle for inspection of different JJM related (Schemes) works as and when required including supply of driver & fuel (minimum 8 Hours duty per day) and all taxes etc. for Burdwan Sub-Division under Burdwan Division, P.H.E. Dte. cons | 0.85 |
88 | Burdwan Division | ORD/000884/2023-2024 | 14/12/2023 | 5515/BWD | YOUNG ENGINEERS CO.-OPERATIVE SOCIETY LTD. | Providing FHTC work at Agradaha village (25 Nos), Jhikra village (20 Nos), Kutubpur village (122 Nos) Habibpur village (232 Nos) & Bajitpur village (16 Nos) under Tehata Zone-II Water Supply Scheme within Kalna Sub-Division under Burdwan Division, PHE Dte | 23.96 |
89 | Burdwan Division | ORD/000883/2023-2024 | 14/12/2023 | 5516/BWD | YOUNG ENGINEERS CO.-OPERATIVE SOCIETY LTD. | Providing FHTC work at Suipara village (13 Nos), Tehata village (52 Nos), Bajitpur village (18 Nos) Narenga village (282 nos) & Baitipara village (52 Nos) under TEHATA Zone-I Water Supply Scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. | 19.32 |
90 | Burdwan Division | ORD/000852/2023-2024 | 28/11/2023 | 2740/BSD | SANDIPAN SENGUPTA | Providing of Air valve of Laying Distribution system for Ruppur PWSS within Burdwan Sub-Division under Burdwan Division, PHE Dte. | 0.96 |
91 | Burdwan Division | ORD/000885/2023-2024 | 14/12/2023 | 5514/BWD | SETH ENTERPRISE | Providing FHTC work at Kalyanpur village under KALYANPUR Water Supply Scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. | 13.89 |
92 | Burdwan Division | ORD/000942/2023-2024 | 19/12/2023 | 2951/BSD | I.S. ENTERPRISE | Laying of inter connection between 3rd tube well site (Mouza-Krishnapur) and distribution system for Nababhat PWSS within Bardhaman-I Block , under Burdwan Division, PHE Dte | 2.91 |
93 | Burdwan Division | ORD/000848/2023-2024 | 28/11/2023 | 2737/BSD | SOUMYAVASH DAS | Additional Bullah pilling(18.0 mtr)at HD Works site(Near Pond)and 350mm DI Pipe laying due to road widening from 4 lane to 6 lane of NH2 at chain age 601+920 of Abujhati PWSS to in Jamalpur Block withinBurdwan Sub-Division under Burdwan Division, PHE Dte | 0.95 |
94 | Burdwan Division | ORD/000943/2023-2024 | 19/12/2023 | 2949/BSD | ISHAN CONSTRUCTION | Laying of inter connection between 3rd tube well site and distribution system for Suhari PWSS within Bardhaman-II Block ,under Burdwan Division, PHE Dte. | 3.04 |
95 | Burdwan Division | ORD/000898/2023-2024 | 28/06/2023 | 825/KSD | PARTHA PRATIM ACHARYA | Work Order for Supply of 1 (one) No. Diesel driven Motor cab on hire basis for the Office of the Assistant Engineer, under Kalna Sub-Division within Burdwan Division, P.H.E. Dte. [Period from 01.07.2023 to 31.12.2023] | 0.00 |
96 | Burdwan Division | ORD/000965/2023-2024 | 02/01/2024 | 002/BWD | R.G. INFRASTRUCTURE | Augmentation of NADRA Piped Water Supply Scheme Construction of 200 cum capacity RCC OHR with 20.0 mtr. with Staging height including soil investigation & Rising Main under BARDHAMAN-II Block, District:- Purba-Bardhaman. _2ND CALL | 72.79 |
97 | Burdwan Division | ORD/000872/2023-2024 | 01/12/2023 | 5324/BWD | THE REGISTRAR JADAVPUR UNIVERSITY | Hydro-geological study of Sub Surface Water Flow/Storage Characteristics for Creation of Sustainable Source and Estimation of Sustainable Yield (5 Nos of Schemes) in Purba Bardhaman District, West Bengal towards implementation of water supply project. | 113.34 |
98 | Burdwan Division | ORD/000954/2023-2024 | 06/12/2023 | 2824/BSD | M/S ASHA CONSTRUCTION | Arrier salary for the Laboratory personnel(Chemist,Bacteriologist,Laboratory Assistnat)Sankari & Sehera Sub District Laboratory under Burdwan Division, PHE Dte. | 0.86 |
99 | Burdwan Division | ORD/000944/2023-2024 | 19/12/2023 | 2950/BSD | M/S PALASH BISWAS | Laying of inter connection between 3rd tube well site (Mouza-Karanda) and distribution system for Palsit PWSS within Bardhaman-II Block , under Burdwan Division, PHE Dte. | 1.95 |
100 | Burdwan Division | ORD/000976/2023-2024 | 29/12/2023 | 3059/BSD | BHARATI CHEMICAL AND SCIENTIFIC WORKS | SupervisionandextendsupporttoNABLrecognizedWaterQualityTestingBlocklevelLaboratoryunderTheExecutiveEngineer,BurdwanDivision,PublicHealthEngineeringDirectorate,GovernmentofWestBengalbyassigningteamofcompetentresourcepersonnelwhowillbeengagedforcompletesupe | 0.90 |
101 | Burdwan Division | ORD/000977/2023-2024 | 29/12/2023 | 3060/BSD | BHARATI CHEMICAL AND SCIENTIFIC WORKS | SupervisionandextendsupporttoNABLrecognizedWaterQualityTestingBlocklevelLaboratoryunderTheExecutiveEngineer,BurdwanDivision,PublicHealthEngineeringDirectorate,GovernmentofWestBengalbyassigningteamofcompetentresourcepersonnelwhowillbeengagedforcompletesupe | 0.51 |
102 | Burdwan Division | ORD/000970/2023-2024 | 02/01/2024 | 006/BWD | DAWN ASSOCIATES | Construction of pump house including plinth protection with surface drain at Head Work TW site for (3.6 mtr. x 3.0 mtr. Size) Borshul Zone-I water supply schemes, Block-Burdwan-II within Burdwan Division, PHE Dte. Dist.-Purba Bardhaman. | 4.53 |
103 | Burdwan Division | ORD/000949/2023-2024 | 20/12/2023 | 5594/BWD | UTPAL NANDI | Restoration of UPVC pipeline which damaged during construction of PCC road & providing FHTC work at DIRGHAPARA Water Supply Scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. | 8.31 |
Total | 3,529.09 |