No. of work order not mapped with AE/JE
Exception Report Showing the Status of Major Pending Works for the Divisions

Update Data
Rs. in Lakh
Sl. No. Division
Working Divisions
System Order No
System generated Order No. for the Work Order as per PHED-MIS
Order Date
Date of Issuance of the Work Order as per PHED-MIS
Memo Number
Memo no. for Work Order Provided by the Divisions as per PHED-MIS
Vendor Name
Vendor Appointed Against this Work Order as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Order Value
Value of Work as mentioned in the Work Order
8 120.63
1 Tamluk Division ORD/000258/2021-2022 24/12/2021 1366/TD ANUPAM CONSTRUCTION Installation of 05 (Five) Nos. 0.5 H.P. capacity Submerssible Pump Set within the Newly constructed Tube well (100 mm. x 50 mm. x 210 mt.) along with stand post at different Sourceless AWC under Egra-II Block of Tamluk Division, PHE Dte. within Purba Med 14.59
2 Tamluk Division ORD/000619/2022-2023 28/10/2022 1345/TSD TAPAS SANTRA Hiring of one no Diesel Motor Cabs(Luxary taxi) (Standerd non air conditioned) Bharat stage-IV, on daily rate basis (including Govt. Holidays as and when required) having contract carriage permit from RTA for the office of Executive Engineer, Tamluk Divi 1.14
3 Tamluk Division ORD/000963/2022-2023 30/03/2023 3584/TD ARUNALOY SCIENTIFIC HOUSE Continuation Work Order for Engagement of 3 nos. laboratory Personal (one no. Chemist / Bacteriologist, one no. laboratory Assistant & one no. Sampling Assistant) for regular analysis, testing and monitoring of water sample and others allied minor Mtc. wo 0.77
4 Tamluk Division ORD/000335/2023-2024 30/05/2023 800/TD UTSAV AGENCY Providing services for operation of 07 (Seven) nos. PHED managed Sub-District laboratories under Tamluk Division, PHE Dte. by engaging one Chemist, one Bacteriologist and one Laboratory Assistant for each laboratory for the period of 12 (Twelve) Months. 53.63
5 Tamluk Division ORD/000451/2023-2024 13/07/2023 1467/TD COMPUTER MEDIA Annual operation, maintenance, minor repairing and software upgradation of Desktop Computer and Peripherals (One set of Monitor, CPU, Keyboard, UPS, Mouse and Printer) including refilling of cartridge of the printers, replacement of battery of UPS (if req 2.77
6 Tamluk Division ORD/000439/2023-2024 12/07/2023 1422/TD M/S. NEW DINDA ENTERPRISE i) Construction of Boundary Wall (as per Departmental Design & Drawing) at 3rd TW site for Augmentation of Sherkhanchak Zone-I PWSS within Khejuri -II Block under Contai Sub-Division of Tamluk Division, P.H.E.Dte.Purba Medinipur.(Length-60.00 mtr.) ii) 41.06
7 Tamluk Division ORD/000336/2023-2024 30/05/2023 801/TD ARUNALOY SCIENTIFIC HOUSE Engagement of 3 nos. laboratory Personal (one no. Chemist / Bacteriologist, one no. laboratory Assistant & one no. Sampling Assistant) for regular analysis, testing and monitoring of water sample and others allied minor Mtc. works of Digha Sub-Divisional 6.43
8 Tamluk Division ORD/000824/2023-2024 27/09/2023 1341/TSD DEBNATH MAITY Continuation work order for Hiring of one no Diesel Motor Cabs (Luxury Taxi) (Standard non air conditioned) Bharat stage-IV, on daily rate basis (including Govt. Holidays as and when required) having contract carriage permit for state of West Bengal for t 0.24
Total 120.63