Sl. No. | Division
Working Divisions
|
System Order No
System generated Order No. for the Work Order as per PHED-MIS
|
Order Date
Date of Issuance of the Work Order as per PHED-MIS
|
Memo Number
Memo no. for Work Order Provided by the Divisions as per PHED-MIS
|
Vendor Name
Vendor Appointed Against this Work Order as per PHED-MIS
|
Work Name
Name of the Work as per the Issued Work Order
|
Order Value
Value of Work as mentioned in the Work Order
|
---|---|---|---|---|---|---|---|
4 | 16.73 | ||||||
1 | Tamluk Division | ORD/000258/2021-2022 | 24/12/2021 | 1366/TD | ANUPAM CONSTRUCTION | Installation of 05 (Five) Nos. 0.5 H.P. capacity Submerssible Pump Set within the Newly constructed Tube well (100 mm. x 50 mm. x 210 mt.) along with stand post at different Sourceless AWC under Egra-II Block of Tamluk Division, PHE Dte. within Purba Med | 14.59 |
2 | Tamluk Division | ORD/000619/2022-2023 | 28/10/2022 | 1345/TSD | TAPAS SANTRA | Hiring of one no Diesel Motor Cabs(Luxary taxi) (Standerd non air conditioned) Bharat stage-IV, on daily rate basis (including Govt. Holidays as and when required) having contract carriage permit from RTA for the office of Executive Engineer, Tamluk Divi | 1.14 |
3 | Tamluk Division | ORD/000963/2022-2023 | 30/03/2023 | 3584/TD | ARUNALOY SCIENTIFIC HOUSE | Continuation Work Order for Engagement of 3 nos. laboratory Personal (one no. Chemist / Bacteriologist, one no. laboratory Assistant & one no. Sampling Assistant) for regular analysis, testing and monitoring of water sample and others allied minor Mtc. wo | 0.77 |
4 | Tamluk Division | ORD/000824/2023-2024 | 27/09/2023 | 1341/TSD | DEBNATH MAITY | Continuation work order for Hiring of one no Diesel Motor Cabs (Luxury Taxi) (Standard non air conditioned) Bharat stage-IV, on daily rate basis (including Govt. Holidays as and when required) having contract carriage permit for state of West Bengal for t | 0.24 |
Total | 16.73 |