List of issued work order
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Showing 1 to 6,230 of 6,230 entries
Sl No.District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrustedName of JE entrustedSystem Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
6230 6,22,052.9,99,99,99951,461.968.27 
Sl No.
District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted
Name of JE entrusted
System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
6230
6,22,052.9,99,99,999
51,461.96
8.27
 
Total
6,22,052.75
51,462.19
8.27
 
1 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) retrofitting in the command area of of Rayan Piped Water Supply Scheme , SM/08102 Retrofitting Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of Rayan Piped Water Supply Scheme at Rayan (Part) (Baisnabpara, Bayanpara, Bhotargra, Bhtarpur, DVC Canal, Dakhinpara, Dangapara, Daspara, Dulapara, Durgamandir, Ghatimgore, Gopaldighi & Hatu Dewan (N)) Village (Mouza), Bardhaman-I Block under Burdwan Division, PHE Dte.._2ND CALL. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000099/2021-2022 3202/BWD 09/06/2021 60 SUNNY ELECTRIC CO. 53.10 51.27 96.55 1
2 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) retrofitting in the command area of of Rayan Piped Water Supply Scheme , SM/08102 Retrofitting Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of Rayan Piped Water Supply Scheme at Rayan (Part) (Hatu Dewan(S), Kantai Krishnapur, Katwa Road, KhanPukur, Krishnapur, MadanSayar, Makumpara, Malikpara, Malir Bagan, Muchipara, Muslimpara & Narupara) Village (Mouza), Bardhaman-I Block under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000191/2021-2022 3143/BWD 04/06/2021 45 S.R. ENTERPRISE 49.27 47.96 97.34 1
3 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) retrofitting in the command area of of Rayan Piped Water Supply Scheme , SM/08102 Retrofitting Extension of upvc distribution pipe line, s/valve chamber & conc. Work (Habitation-Belbagan,sutradharpara, Khanpukur & Adibasipara under Nari village) in regarding FHTC for Rayan water supply scheme at Bardhhaman-I Development Block under Burdwan Division, PHE Dte.Gr.B. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000401/2021-2022 70/BSD 14/01/2022 30 BRINDABAN KONAR 4.64 4.32 93.1 1
4 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) retrofitting in the command area of of Rayan Piped Water Supply Scheme , SM/08102 Retrofitting Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of RAYAN Piped Water Supply Scheme at Narayandighi & Sadhanpur (Part) Village (Mouza), Burdwan - I Block under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000340/2021-2022 27/BWD 04/01/2022 30 DUBE ENTERPRISE 30.24 30.23 99.97 1
5 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) retrofitting in the command area of of Rayan Piped Water Supply Scheme , SM/08102 Retrofitting Laying of interconnection between tube well No 1 to 6 & OHR and OHR to distribution system for RAYAN & Its Adjoing Mouzas Water Supply Scheme within Bardhaman I Dev. Block , under Burdwan Division, PHE Dte.Gr.C. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000402/2021-2022 71/BSD 14/01/2022 30 BRINDABAN KONAR 4.81 0.00 0 1
6 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) retrofitting in the command area of of Rayan Piped Water Supply Scheme , SM/08102 Retrofitting Providing FHTC of distribution pipe line at Nari village(Habitation-Sutradharpara,Adibasipara & Suriyapally)for RAYAN Water Supply Scheme at Bardhhaman-I Development Block under Burdwan Division,PHE Dte.Gr.A Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000030/2022-2023 677/BSD 22/04/2022 30 BRINDABAN KONAR 2.68 2.68 100 1
7 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) retrofitting in the command area of of Rayan Piped Water Supply Scheme , SM/08102 Retrofitting Extension of UPVC distribution pipeline sluice valve chamber & concrete work in regarding FHTC for Rayan water supply scheme of Bardhaman-I Development Block under Burdwan Division, PHE Dte.[Gr.-E] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000767/2021-2022 1428/BSD 28/10/2021 30 S.R. ENTERPRISE 4.01 4.00 99.75 1
8 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) retrofitting in the command area of of Rayan Piped Water Supply Scheme , SM/08102 Retrofitting Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of RAYAN Piped Water Supply Scheme at Naridaspara and balance portion of Sukantapally, Suryapally, Nari Purbapara & Nasakali (Nari Mouza), Burdwan - I Block under Burdwan Division, PHE. Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000080/2022-2023 2558/BWD 19/05/2022 30 SARKAR AGENCY 41.42 41.57 100.36 1
9 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) retrofitting in the command area of of Rayan Piped Water Supply Scheme , SM/08102 Retrofitting Road restoration work due to FHTC & extension pipeline for different village (Rayan, Naryandighi, Nari Das Para, Krishnapur, Nari & Sukantapally) under RAYAN Piped W/S. Scheme at Burdwan - I Dev. Block under Burdwan Division, PHE. Dte. ORD/000593/2023-2024 3771/BWD 29/08/2023 30 DURGAPADA MONDAL 5.97 0.00 0 100
10 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) retrofitting in the command area of of Rayan Piped Water Supply Scheme , SM/08102 Retrofitting Material Requisition To Resource Division RTOR000001/2024-2025 4103/BWD 25/11/2024 Resource Division 54.42 0.00 0 0
11 PURBA BARDHAMAN Burdwan Division Retrofitting wroks for Providing Functional Household Tap Connection (FHTC) within the command area of of Nandai and adj.Mouzas Piped Water Supply Scheme, Block Kalna-I, District Purba Bardhaman , SM/08104 Retrofitting Continuation work order for Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Uttar Rameswarpur village of Nandai Piped Water Supply Scheme within Kalna Sub-Divn. under Burdwan Division, PHE. Dte. [Phase - I] [Sl.No : 4B] Assistant Engineer Junior Engineer, R.W.S. Burdwan Sub Division, P.H.E. Dt ORD/000035/2021-2022 3409/BWD 25/06/2021 30 AURGHA BHATTACHARYA 4.92 0.00 0 1
12 PURBA BARDHAMAN Burdwan Division Retrofitting wroks for Providing Functional Household Tap Connection (FHTC) within the command area of of Nandai and adj.Mouzas Piped Water Supply Scheme, Block Kalna-I, District Purba Bardhaman , SM/08104 Retrofitting Supply of materials for different water supply scheme under Burdwan Division, PHE Dte. VCH/001237/2021-2022 1132/DW 26/02/2022 EXECUTIVE ENGINEER, RESOURCES DIVISION, P.H.E. DTE. 221.00 0.00 0 0
13 PURBA BARDHAMAN Burdwan Division Retrofitting wroks for Providing Functional Household Tap Connection (FHTC) within the command area of of Nandai and adj.Mouzas Piped Water Supply Scheme, Block Kalna-I, District Purba Bardhaman , SM/08104 Retrofitting Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of Nandai Piped Water Supply Scheme at Nandai (Part) (7 Nos Habitation Part), Nagargachhi, Pardupra & Uttar Rameswarpur (Part) Village (Mouza), Kalna-I Block under Burdwan Division, PHE Dte. Assistant Engineer ORD/000089/2021-2022 3599/BWD 13/07/2021 60 INDIAN ENGINEERS CO.-OPERATIVE SOCIETY LTD. 110.43 107.33 97.19 1
14 PURBA BARDHAMAN Burdwan Division Retrofitting wroks for Providing Functional Household Tap Connection (FHTC) within the command area of of Nandai and adj.Mouzas Piped Water Supply Scheme, Block Kalna-I, District Purba Bardhaman , SM/08104 Retrofitting Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of NANDAI Piped Water Supply Scheme at opposite site of railway track at Malatipur, Nagargachhi, Mirjapur, Durgapur habitations, Kalna - I Block under Burdwan Division, PHE Dte. Assistant Engineer ORD/000002/2022-2023 1869/BWD 05/04/2022 30 KOUSIK MALLICK 51.64 49.63 96.11 1
15 PURBA BARDHAMAN Burdwan Division Retrofitting wroks for Providing Functional Household Tap Connection (FHTC) within the command area of of Nandai and adj.Mouzas Piped Water Supply Scheme, Block Kalna-I, District Purba Bardhaman , SM/08104 Retrofitting Hire & fuel charges of vehicle (Car No.-WB-41J-6795) for the office of the Superintending Engineer, Central Circle, PHE Dte. for the month of January & February'23. BILL/00292/2023-2024 218/JJM 06/06/2023 MD HASIN 0.79 0.00 0 0
16 PURBA BARDHAMAN Burdwan Division Retrofitting wroks for Providing Functional Household Tap Connection (FHTC) within the command area of of Nandai and adj.Mouzas Piped Water Supply Scheme, Block Kalna-I, District Purba Bardhaman , SM/08104 Retrofitting Sinking of 250 X 150mm dia Tube Well 150 mtr. Depth by D.R. Rig method using UPVC pipe (CD) and UPVC Deep Well Screen (RDS) for Aug. of BAIDYAPUR (Z-I) PWSS, Block - Kalna - II and NANDAI PWSS, Block - Kalna - I Piped Water Supply Scheme, Dist - Purba Bardhaman under Burdwan Division, PHE Dte. [For 02 Nos. Tube well]. ORD/000151/2023-2024 2424/BWD 30/05/2023 45 KOUSIK MALLICK 19.84 0.00 0 100
17 PURBA BARDHAMAN Burdwan Division Retrofitting wroks for Providing Functional Household Tap Connection (FHTC) within the command area of of Nandai and adj.Mouzas Piped Water Supply Scheme, Block Kalna-I, District Purba Bardhaman , SM/08104 Retrofitting Material Requisition To Resource Division RTOR000122/2021-2022 1109/BWD 26/02/2022 Resource Division 67.99 0.00 0 0
18 PURBA BARDHAMAN Burdwan Division Retrofitting wroks for Providing Functional Household Tap Connection (FHTC) within the command area of of Nandai and adj.Mouzas Piped Water Supply Scheme, Block Kalna-I, District Purba Bardhaman , SM/08104 Retrofitting Quotation for new service connection charges at Nandai PWSS [PH No.-V][Ref ID-503434397] BILL/01125/2023-2024 1086/JJM 20/12/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LTD. 9.28 0.00 0 0
19 PURBA BARDHAMAN Burdwan Division Retrofitting wroks for Providing Functional Household Tap Connection (FHTC) within the command area of of Nandai and adj.Mouzas Piped Water Supply Scheme, Block Kalna-I, District Purba Bardhaman , SM/08104 Retrofitting Vehicle bill (Car No.-WB-04G-7127) for the month of September'2023. BILL/01680/2023-2024 1041/JJM 11/12/2023 PARTHA PRATIM ACHARYA 0.39 0.00 0 0
20 PURBA BARDHAMAN Burdwan Division Retrofitting wroks for Providing Functional Household Tap Connection (FHTC) within the command area of of Nandai and adj.Mouzas Piped Water Supply Scheme, Block Kalna-I, District Purba Bardhaman , SM/08104 Retrofitting Work Order for "Laying of pipeline at gap portion of old and new pipeline of Nandai Piped Water Supply Scheme within Kalna Sub-Division under Burdwan Division , PHE Dte. " Assistant Engineer Junior Engineer, R.W.S. Burdwan Sub Division, P.H.E. Dt ORD/000947/2023-2024 1714/KSD 04/12/2023 7 ER CONSTRUCTION & GENERAL ORDER SUPPLIER 0.64 0.00 0 100
21 PURBA BARDHAMAN Burdwan Division Retrofitting wroks for Providing Functional Household Tap Connection (FHTC) within the command area of of Nandai and adj.Mouzas Piped Water Supply Scheme, Block Kalna-I, District Purba Bardhaman , SM/08104 Retrofitting Work Order For "CONSTRUCTION OF TEMPORARY KIOSK FOR THE NECESSARY ARRANGEMENT OF ELECTRIFICATION OF TUBEWELL FOR NANDAI PWSS & SHIKARPUR PWSS UNDER KALNA SUB-DIVISION UNDER BURDWAN DIVISION, PHE DTE." Assistant Engineer Junior Engineer, R.W.S. Burdwan Sub Division, P.H.E. Dt ORD/001144/2023-2024 1980/KSD 09/02/2024 10 ER CONSTRUCTION & GENERAL ORDER SUPPLIER 0.66 0.00 0 100
22 PURBA BARDHAMAN Burdwan Division Retrofitting wroks for Providing Functional Household Tap Connection (FHTC) within the command area of of Nandai and adj.Mouzas Piped Water Supply Scheme, Block Kalna-I, District Purba Bardhaman , SM/08104 Retrofitting Work Order for "Restoration of 350 mm dia DI Rising Main with other allied works in connection with Augmentation of Nandai (SM/08104) Piped Water Supply Scheme under Kalna Sub-Division under Burdwan Division, PHE Dte." Assistant Engineer Junior Engineer, R.W.S. Burdwan Sub Division, P.H.E. Dt ORD/001188/2023-2024 2192/KSD 15/03/2024 15 ER CONSTRUCTION & GENERAL ORDER SUPPLIER 3.30 0.00 0 100
23 PURBA BARDHAMAN Burdwan Division Retrofitting wroks for Providing Functional Household Tap Connection (FHTC) within the command area of of Nandai and adj.Mouzas Piped Water Supply Scheme, Block Kalna-I, District Purba Bardhaman , SM/08104 Retrofitting Construction of Pump House cum switch room (5.40 mtr x 3.60 mtr) with sanitary arrangement (as per drawing no. PHE/SE/CC/PH/DWG-01/2022-2023) at NANDAI Water Supply Scheme within Kalna Sub-Divn. under Burdwan Division, PHE Dte. Dist.-Purba Bardhaman. Assistant Engineer Junior Engineer, R.W.S. Burdwan Sub Division, P.H.E. Dt ORD/000806/2023-2024 4820/BWD 08/11/2023 352 SK BADIUZZAMAL 5.69 1.15 20.21 100
24 PURBA BARDHAMAN Burdwan Division Retrofitting wroks for Providing Functional Household Tap Connection (FHTC) within the command area of of Nandai and adj.Mouzas Piped Water Supply Scheme, Block Kalna-I, District Purba Bardhaman , SM/08104 Retrofitting Providing left out FHTC at Different places under the Command area of Nandai PWSS under Kalna Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer Junior Engineer, R.W.S. Burdwan Sub Division, P.H.E. Dt ORD/000717/2024-2025 3720/BWD 29/10/2024 56 ER CONSTRUCTION & GENERAL ORDER SUPPLIER 9.32 0.00 0 100
25 PURBA BARDHAMAN Burdwan Division Providing Functional House Hold Tap Connection (FHTC) by retrofitting within the command area of Shaktigarh Piped Water Supply Scheme , SM/07204 Retrofitting Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Saktigarh (Pt-A) village of Saktigarh piped water supply scheme within Burdwan Sub-Division under Burdwan Division, PHE Dte. [Phase-I](Tr No.-172/BWD/2020-21) Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000098/2020-2021 2747/BWD 10/08/2020 30 SARKAR AGENCY 4.92 4.92 100 1
26 PURBA BARDHAMAN Burdwan Division Providing Functional House Hold Tap Connection (FHTC) by retrofitting within the command area of Shaktigarh Piped Water Supply Scheme , SM/07204 Retrofitting Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Saktigarh (Pt-B) village of Shaktigarh Piped Water Supply Scheme within Burdwan Sub-Divn. under Burdwan Division, PHE. Dte. [Phase - I] [GROUP : ¿8B¿] (T.R. No.-380/BWD/2020-21) Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000151/2020-2021 2742/BWD 10/08/2020 30 T.K. BANERJEE & CO. 4.91 4.91 100 1
27 PURBA BARDHAMAN Burdwan Division Providing Functional House Hold Tap Connection (FHTC) by retrofitting within the command area of Shaktigarh Piped Water Supply Scheme , SM/07204 Retrofitting Continuation work order for Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Saktigarh (Pt-A) village of Shaktigarh Piped Water Supply Scheme within Burdwan Sub-Divn. under Burdwan Division, PHE. Dte. [Phase - I] [GROUP : ¿8A¿] (T.R. No. 428/BWD/2020-21) Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000150/2020-2021 3801/BWD 08/10/2020 30 SARKAR AGENCY 4.92 4.92 100 1
28 PURBA BARDHAMAN Burdwan Division Providing Functional House Hold Tap Connection (FHTC) by retrofitting within the command area of Shaktigarh Piped Water Supply Scheme , SM/07204 Retrofitting Continuation work order for Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Shaktigarh (Part-B) village of Shaktigarh piped water supply scheme within Burdwan Sub-Division under Burdwan Division, PHE Dte. [Phase-I](Tr No.-649/BWD/2020-21) Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000253/2020-2021 4271/BWD 03/11/2020 30 T.K. BANERJEE & CO. 4.91 4.91 100 1
29 PURBA BARDHAMAN Burdwan Division Providing Functional House Hold Tap Connection (FHTC) by retrofitting within the command area of Shaktigarh Piped Water Supply Scheme , SM/07204 Retrofitting Providing Functional Household Tap connection (FHTC) from existing distribution system within the command area of Saktigarh Piped water supply scheme at Shaktigarh village, Burdwan-II Block under Burdwan Division, PHE Dte. [Tr No.-101/SE/CC/2020-21] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000403/2020-2021 715/BWD 28/01/2021 60 SARKAR AGENCY 62.17 40.67 65.42 1
30 PURBA BARDHAMAN Burdwan Division Providing Functional House Hold Tap Connection (FHTC) by retrofitting within the command area of Shaktigarh Piped Water Supply Scheme , SM/07204 Retrofitting Construction of Pump House cum chlorine room without sanitary and water supply arrangement at 2nd tube well site for Shaktigarh & its adjoining mouzas water supply scheme , Block-Bardhaman-II under Burdwan Division, PHE Dte.[Gr.-G] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000754/2021-2022 1391/BSD 07/10/2021 60 DEBJYOTI GOSWAMI 2.77 2.53 91.34 1
31 PURBA BARDHAMAN Burdwan Division Providing Functional House Hold Tap Connection (FHTC) by retrofitting within the command area of Shaktigarh Piped Water Supply Scheme , SM/07204 Retrofitting Providing bib cock,stop cock & PVC Pipe for existing FHTC of Shaktigar PWSS under Burdwan Sub Division ,Block:BWN-II under Burdwan Divn,PHE Dte. Junior Engineer, Burdwan Sadar Sub-Division ORD/001281/2024-2025 504/BSD 06/03/2025 30 SARKAR AGENCY 0.94 0.00 0 0
32 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Amra Piped Water Supply Scheme , SM/06969 Retrofitting Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Dogachia village of Amra piped water supply scheme within Burdwan Sub-Division under Burdwan Division, PHE Dte. [Phase-I](Tr No.-232/BWD/2020-21) ORD/000093/2020-2021 2737/BWD 10/08/2020 30 KALYAN CHOWDHURY 4.92 4.92 100 1
33 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Amra Piped Water Supply Scheme , SM/06969 Retrofitting Continuation work order for Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Amra village of Amra piped water supply scheme within Burdwan Sub-Division under Burdwan Division, PHE Dte. [Phase-I](Tr No.-404/BWD/2020-21) Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. Junior Engineer, R.W.S. Burdwan Sub Division, P.H.E. Dt ORD/000092/2020-2021 3531/BWD 25/09/2020 30 DEBASHISH ENTERPRISE 4.92 4.92 100 1
34 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Amra Piped Water Supply Scheme , SM/06969 Retrofitting Continuation work order for Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Teli Nuri village of Amra piped water supply scheme within Burdwan Sub-Division under Burdwan Division, PHE Dte. [Phase-I](Tr No.-427/BWD/2020-21) Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. Junior Engineer, R.W.S. Burdwan Sub Division, P.H.E. Dt ORD/000085/2020-2021 3530/BWD 25/09/2020 30 KALYAN CHOWDHURY 4.92 4.92 100 1
35 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Amra Piped Water Supply Scheme , SM/06969 Retrofitting Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Amra village of Amra piped water supply scheme within Burdwan Sub-Division under Burdwan Division, PHE Dte. [Phase-I](Tr No.-208/BWD/2020-21) ORD/000083/2020-2021 2734/BWD 10/08/2020 30 DEBASHISH ENTERPRISE 4.92 4.92 100 1
36 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Amra Piped Water Supply Scheme , SM/06969 Retrofitting Supply of SS316 grade flow control valve for FHTC at different water supply schemes within Kalna Sub-Division under Burdwan Division, PHE Dte. and delivered at Barsul Divisional store.[Part-2] Assistant Engineer ORD/001307/2020-2021 1792 /BWD 26/02/2021 10 INDIA PIPE FITTING CO 9.70 1.11 11.44 1
37 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Amra Piped Water Supply Scheme , SM/06969 Retrofitting Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of Amra Piped Water Supply Scheme at Amra (2 Nos Habitation Part) & Dogachia Village (Mouza), Jamalpur Block under Burdwan Division, PHE Dte._3rd CALL. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000008/2021-2022 3138/BWD 03/06/2021 45 D.M. ENTERPRISE 57.42 20.77 36.17 1
38 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Amra Piped Water Supply Scheme , SM/06969 Retrofitting Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of AMRA Piped Water Supply Scheme (Vill-Dogechia, Habitation- Dogechia ) at Jamalpur Block of Burdwan Sub-Division under Burdwan Division, PHE Dte.Gr.A. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000386/2021-2022 57/BSD 13/01/2022 30 DEY NIRMAN 4.81 4.78 99.38 1
39 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Amra Piped Water Supply Scheme , SM/06969 Retrofitting Extension of pipeline at AMRA water supply scheme at different villages (Tengaberia, Badpur & Kolupukur) FHTC of Jamalpur Block under Burdwan Division, PHE Dte.[Gr.-F] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000561/2021-2022 1374/BSD 05/10/2021 30 D.M. ENTERPRISE 4.74 0.00 0 1
40 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Amra Piped Water Supply Scheme , SM/06969 Retrofitting Construction of Boundary wall at 3rd Tube well site of Dogachia Mouza of Amra water supply scheme under Jamalpur block under Burdwan Division, PHE Dte. [Length-59 Mtr][Gr.-F] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000557/2021-2022 1028/BSD 05/08/2021 45 MUKHERJEE ENTERPRISE 4.45 0.00 0 1
41 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Amra Piped Water Supply Scheme , SM/06969 Retrofitting Providing FHTC for Dogachia Mouza [(Habitation (Village)] for AMRA piped W/S Scheme, Jamalpur Dev. Block under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000068/2023-2024 2019/BWD 28/04/2023 30 DEY NIRMAN 20.61 10.40 50.46 100
42 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Amra Piped Water Supply Scheme , SM/06969 Retrofitting Continuation work order for Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Jougram village (Jougram habitation) of Jougram Piped Water Supply Scheme within Burdwan Sub-Divn. under Burdwan Division, PHE. Dte. (Part-C) [SL. No. : 11] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000031/2021-2022 3408/BWD 25/06/2021 15 N.S. ENTERPRISE 4.86 4.27 87.86 1
43 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Amra Piped Water Supply Scheme , SM/06969 Retrofitting Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Dattapur village (Adampur habitation) of Jougram Piped Water Supply Scheme within Burdwan Sub-Divn. under Burdwan Division, PHE. Dte. [SL. No. : 11] ORD/000428/2020-2021 590/BWD 25/01/2021 15 N.S. ENTERPRISE 4.86 3.29 67.7 0
44 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Amra Piped Water Supply Scheme , SM/06969 Retrofitting Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Jougram village (Jougram habitation) of Jougram Piped Water Supply Scheme within Burdwan Sub-Divn. under Burdwan Division, PHE. Dte. (Part-B) [SL. No. : 13] ORD/000427/2020-2021 592/BWD 25/01/2021 15 DEY NIRMAN 4.84 4.84 100 0
45 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Amra Piped Water Supply Scheme , SM/06969 Retrofitting Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Jougram village (Jougram habitation) of Jougram Piped Water Supply Scheme within Burdwan Sub-Divn. under Burdwan Division, PHE. Dte. (Part-A) [SL. No. : 12] (Agreement No. 671/BWD of 2020-21) ORD/000429/2020-2021 591/BWD 25/01/2021 15 MUKHERJEE ENTERPRISE 4.86 4.86 100 0
46 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Amra Piped Water Supply Scheme , SM/06969 Retrofitting Continuation work order for Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Jougram village (Jougram habitation) of Jougram Piped Water Supply Scheme within Burdwan Sub-Divn. under Burdwan Division, PHE. Dte. (Part-A) [SL. No. : 12] (Agreement no. 839/BWD of 2020-21) ORD/000430/2020-2021 1397/BWD 15/02/2021 15 MUKHERJEE ENTERPRISE 4.86 4.86 100 0
47 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Amra Piped Water Supply Scheme , SM/06969 Retrofitting Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Jajanpur village and Jajanpur-Tangaberia habitation of JAUGRAM piped water supply scheme within Burdwan Sub-Division under Burdwan Division, PHE Dte.[Phase-I][Gr.-6B] ORD/000740/2020-2021 3331/BWD 18/09/2020 30 DEY NIRMAN 4.86 4.86 100 0
48 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of ISUFABAD Piped Water Supply Scheme , SM/07860 Retrofitting Pipeline with FHTC for Isufabad Water Supply Scheme at Fagupur village (15 Nos) of Burdwan-I Block, under Burdwan Division, PHE Dte. Gr.C. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000476/2022-2023 1600/BSD 14/09/2022 30 DUBE ENTERPRISE 3.08 2.78 90.26 1
49 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of ISUFABAD Piped Water Supply Scheme , SM/07860 Retrofitting Pipeline with FHTC for Isufabad Water Supply Scheme at ISUFABAD village (15 Nos) of Burdwan-I Block, under Burdwan Division, PHE Dte. Gr.J. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000483/2022-2023 1607/BSD 14/09/2022 30 DUBE ENTERPRISE 1.89 1.63 86.24 1
50 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of ISUFABAD Piped Water Supply Scheme , SM/07860 Retrofitting Extension of pipeline for ISUFABAD Water Supply Scheme at KASIMPUR village within BURDWAN-I Block , under Burdwan Division, PHE Dte.Gr.A Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000473/2021-2022 274/BSD 15/02/2022 30 SUPRIYA RAY 4.98 0.00 0 1
51 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of ISUFABAD Piped Water Supply Scheme , SM/07860 Retrofitting Providing 19 Nos. FHTC at DHOLAN & FAGUPUR village for declaration of SWAJALGRAM under ISHUFABAD Piped Water Supply Scheme, Block- Burdwan-I within Burdwan Sub Division under Burdwan Division PHE Dte. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000146/2024-2025 1035/BSD 10/06/2024 30 MUKHERJEE ENTERPRISE 0.91 0.00 0 0
52 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of ISUFABAD Piped Water Supply Scheme , SM/07860 Retrofitting Providing 19 Nos. FHTC at ISHUFABAD & GRAMGORIA village for declaration of SWAJALGRAM under ISHUFABAD Piped Water Supply Scheme, Block- Burdwan-I within Burdwan Sub Division under Burdwan Division PHE Dte JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000152/2024-2025 1037/BSD 10/06/2024 30 DEBASHISH ENTERPRISE 0.91 0.00 0 0
53 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of ISUFABAD Piped Water Supply Scheme , SM/07860 Retrofitting Providing 35 Nos.FHTC at KASHIMPUR village for declearation of SWAJALGRAM under ISHUFABAD Piped Water Supply Scheme, Block- Burdwan-I within Burdwan Sub Division under Burdwan Division PHE Dte. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000296/2024-2025 1278/BSD 12/07/2024 45 DUBE ENTERPRISE 1.64 0.00 0 0
54 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of ISUFABAD Piped Water Supply Scheme , SM/07860 Retrofitting Providing 19 Nos. FHTC at DHOLAN & FAGUPUR village for declaration of SWAJALGRAM under ISHUFABAD Piped Water Supply Scheme, Block- Burdwan-I within Burdwan Sub Division under Burdwan Division PHE Dte. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000178/2024-2025 1036/BSD 10/06/2024 30 MUKHERJEE ENTERPRISES 0.91 0.00 0 100
55 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Kashipur Piped Water Supply Scheme at Purbasthali-II Block , SM/07802 Retrofitting Supply of materials for different water supply scheme under Burdwan Division, PHE Dte. VCH/001013/2021-2022 null 21/01/2022 EXECUTIVE ENGINEER, RESOURCES DIVISION, P.H.E. DTE. 617.98 0.00 0 0
56 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Kashipur Piped Water Supply Scheme at Purbasthali-II Block , SM/07802 Retrofitting Payment for supply of materials for different water supply scheme under Burdwan Division, PHE Dte. VCH/001045/2021-2022 934/DW 31/01/2022 EXECUTIVE ENGINEER, RESOURCES DIVISION, P.H.E. DTE. 617.98 0.00 0 0
57 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Kashipur Piped Water Supply Scheme at Purbasthali-II Block , SM/07802 Retrofitting Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Kashipur (Part) village (Kashipur habitation) of Kashipur Piped Water Supply Scheme within Durgapur Sub-Divn. under Burdwan Division, PHE. Dte. [SL. No. : 18] [Agr. No. 720/BWD of 2020-2021] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000375/2020-2021 1441/BWD 18/02/2021 15 PREMANANDA ROY BISWAS 4.48 0.00 0 1
58 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Kashipur Piped Water Supply Scheme at Purbasthali-II Block , SM/07802 Retrofitting Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Kashipur village (Kashipur habitation) of Kashipur Piped Water Supply Scheme within Kalna Sub-Divn. under Burdwan Division, PHE. Dte. [SL. No. : 20] AE(HQs) J.E. 2 BURDWAN ORD/000466/2020-2021 596/BWD 25/01/2021 15 IYASIN DAFADAR 4.86 4.86 100 1
59 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Dirghapara Piped Water Supply Scheme at Purbasthali-I Block , SM/07804 Retrofitting Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Dirghapara village and Dirghapara (Part-B) habitation of Dirghapara piped water supply scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. [Phase-I](Tr No.-484/BWD/2020-21) Assistant Engineer ORD/000175/2020-2021 4119/BWD 16/10/2020 30 SK NUR ALAM 4.86 4.86 100 1
60 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Dirghapara Piped Water Supply Scheme at Purbasthali-I Block , SM/07804 Retrofitting Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Kharashgram (Part) village , Kharashgram (Part) habitation of Dirghapara piped water supply scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. [Part-C][SL NO.-12] Assistant Engineer ORD/000705/2020-2021 62/BWD 05/01/2021 15 INVENT ENGINEERS CO. OPERATIVE SOCIETY LTD. 4.84 4.84 100 1
61 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Dirghapara Piped Water Supply Scheme at Purbasthali-I Block , SM/07804 Retrofitting Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Kharashgram (Part) village (Kharashgram (Part) habitation) of Dirghapara Piped Water Supply Scheme within Kalna Sub-Divn. under Burdwan Division, PHE. Dte. (Part - B) [Sl. No. : ¿11¿] Assistant Engineer ORD/000649/2020-2021 61/BWD 05/01/2021 15 SK NUR ALAM 4.86 4.86 100 1
62 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Dirghapara Piped Water Supply Scheme at Purbasthali-I Block , SM/07804 Retrofitting Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Kharashgram (Part) village (Kharashgram (Part) habitation) of Dirghapara Piped Water Supply Scheme within Kalna Sub-Divn. under Burdwan Division, PHE. Dte. (Part - A) [Sl. No. : ¿10¿] Assistant Engineer ORD/000648/2020-2021 60/BWD 05/01/2021 15 HAFIJUR RAHAMAN MIDYA 4.86 4.86 100 1
63 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Dirghapara Piped Water Supply Scheme at Purbasthali-I Block , SM/07804 Retrofitting Continuation work order for Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Dirghapara village and Dirghapara (Part-A) habitation of Dirghapara Piped Water Supply Scheme within Kalna Sub-Divn. under Burdwan Division, PHE. Dte. [Phase - I] [GROUP : ¿8A¿] Assistant Engineer ORD/000121/2021-2022 4391/BWD 31/08/2021 30 HAFIJUR RAHAMAN MIDYA 4.55 4.10 90.11 1
64 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Dirghapara Piped Water Supply Scheme at Purbasthali-I Block , SM/07804 Retrofitting Continuation work order for Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Kharashgram (Part) village (Kharashgram (Part) habitation) of Dirghapara Piped Water Supply Scheme within Kalna Sub-Divn. under Burdwan Division, PHE. Dte. (Part - A) [Sl. No. : ¿10¿] Assistant Engineer ORD/000197/2021-2022 6231/BWD 01/11/2021 15 HAFIJUR RAHAMAN MIDYA 4.86 4.86 100 1
65 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Dirghapara Piped Water Supply Scheme at Purbasthali-I Block , SM/07804 Retrofitting Continuation work order for Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Kharashgram (Part) village (Kharashgram (Part) habitation) of Dirghapara Piped Water Supply Scheme within Kalna Sub-Divn. under Burdwan Division, PHE. Dte. (Part - B) [Sl. No. : ¿11¿] Assistant Engineer ORD/000198/2021-2022 6232/BWD 01/11/2021 15 SK NUR ALAM 4.86 4.76 97.94 1
66 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Dirghapara Piped Water Supply Scheme at Purbasthali-I Block , SM/07804 Retrofitting Continuation work order for Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Kharashgram (Part) village (Kharashgram (Part) habitation) of Dirghapara Piped Water Supply Scheme within Kalna Sub-Divn. under Burdwan Division, PHE. Dte. (Part - C) [Sl. No. : ¿12¿] Assistant Engineer ORD/000205/2021-2022 6401/BWD 16/11/2021 15 INVENT ENGINEERS CO. OPERATIVE SOCIETY LTD. 4.84 4.84 100 1
67 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Dirghapara Piped Water Supply Scheme at Purbasthali-I Block , SM/07804 Retrofitting Extension of 63 mm dia UPVC pipeline to provide house connection at different leftout portion of Dirghapara w/s scheme within Kalna Sub-Division under Burdwan Division, PHE Dte.[Sl-E] Assistant Engineer ORD/000937/2020-2021 171/KSD 19/02/2021 30 SK RAJU 1.78 1.62 91.01 1
68 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Dirghapara Piped Water Supply Scheme at Purbasthali-I Block , SM/07804 Retrofitting Extension of different dia UPVC pipeline at the leftout portion of Kharoshgram village of Dirghapara PWSS within Kalna Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer ORD/000243/2021-2022 6106/BWD 08/10/2021 30 M/S UNIQUE 6.67 6.86 102.85 1
69 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Dirghapara Piped Water Supply Scheme at Purbasthali-I Block , SM/07804 Retrofitting Restoration of UPVC pipeline which damaged during construction of PCC road & providing FHTC work at DIRGHAPARA Water Supply Scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. ORD/000949/2023-2024 5594/BWD 20/12/2023 30 UTPAL NANDI 8.31 0.00 0 0
70 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Dirghapara Piped Water Supply Scheme at Purbasthali-I Block , SM/07804 Retrofitting Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Jagarpur & Mugura village of Mugura Piped Water Supply Scheme within Headquarters under Burdwan Division, PHE. Dte. [Phase - I] [GROUP : ¿3B¿] (Agreement no.238/BWD of 2020-21) Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000136/2020-2021 4118/BWD 16/10/2020 30 HAFIJUR RAHAMAN MIDYA 4.92 4.86 98.78 1
71 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Dirghapara Piped Water Supply Scheme at Purbasthali-I Block , SM/07804 Retrofitting Different types of works involve in connection with Augmentation of DIRGHAPARA (SM/07804) Water Supply Scheme, MOUDANGA (SM/ 14020) Water supply Scheme & BHANDARTIKURI (SM/14925) Water Supply Scheme under Burdwan Division, PHE Dte. Assistant Engineer ORD/000357/2024-2025 2912/BWD 25/07/2024 120 BANSBERIA CONSTRUCTION CO. 293.38 0.00 0 0
72 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Dirghapara Piped Water Supply Scheme at Purbasthali-I Block , SM/07804 Retrofitting Wbsedcl Quotation for new service connection at Dirghapara Pwss Ph-03 BILL/00059/2025-2026 null 16/04/2025 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 6.46 0.00 0 null
73 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Jhaudanga Piped Water Supply Scheme at Purbasthali-II Block , SM/07805 Retrofitting Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Jhaudanga & Sarisha village and North Jhaudwnga (Part) & Sarisha habitation of Jhaudanga piped water supply scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. [Phase-I](Tr No.-554/BWD/2020-21) Assistant Engineer ORD/000256/2020-2021 4114/BWD 16/10/2020 30 BARABELUN NO.-II G.P. UNEMPLOYED CO-OP LABOUR CONTRACT & CONSTRUCTION SOCIETY LTD. 4.86 4.86 100 1
74 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Jhaudanga Piped Water Supply Scheme at Purbasthali-II Block , SM/07805 Retrofitting Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Jhaudanga village and North Jhaudanga (Part) habitation of Jhaudanga piped water supply scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. [Phase-I](Tr No.-761/BWD/2020-21) Assistant Engineer ORD/000372/2020-2021 4113/BWD 16/10/2020 30 BARDHAMAN AQUA ENGINEERING 4.86 4.86 100 1
75 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Jhaudanga Piped Water Supply Scheme at Purbasthali-II Block , SM/07805 Retrofitting Continuation work order for Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Jhaudanga village and North Jhaudanga (Part) habitation of Jhaudanga piped water supply scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. [Phase-I](Tr No.-762/BWD/2020-21) Assistant Engineer ORD/000373/2020-2021 4795/BWD 03/12/2020 30 BARDHAMAN AQUA ENGINEERING 3.51 3.51 100 1
76 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Jhaudanga Piped Water Supply Scheme at Purbasthali-II Block , SM/07805 Retrofitting Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Jhaudanga village (Jhaudanga south habitation) of Jhaudanga piped water supply scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. [Phase-I](Tr No.-868/BWD/2020-21) Assistant Engineer ORD/000612/2020-2021 597/BWD 25/01/2021 15 INVENT ENGINEERS CO. OPERATIVE SOCIETY LTD. 4.86 4.86 100 1
77 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Jhaudanga Piped Water Supply Scheme at Purbasthali-II Block , SM/07805 Retrofitting Digital structurization of pipeline alignment and asset evaluation including holistic design, preparation of design drawings of overall LDS & preparation of estimate for 09 Nos. Piped W/S. Schemes under Purbasthali II Block under Kalna Sub-Division under Burdwan Division, PHE. Dte. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000338/2024-2025 3018/BWD 05/08/2024 50 HORIZEN 23.70 7.42 31.31 10
78 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Jhaudanga Piped Water Supply Scheme at Purbasthali-II Block , SM/07805 Retrofitting Supply & Laying of 300mm Dia M.S.E.R.W Pipe including Jack Pushing along with other allied work in connection with different Augmentation & New [(SM/18439, SM/14437, SM/14435, SM/07805, SM/14440, SM/15571, SM/08030, SM/16014, SM/15588, SM/16298 & SM/16307)] under Kalna Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/001187/2024-2025 608/BWD 11/02/2025 180 MANASH GHOSH 1,209.62 0.00 0 0
79 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of AUGMENTATION OF PURBASTHALI Piped Water Supply Scheme at Purbasthali-II Block , SM/07866 Retrofitting Providing Functional Household tap connection from existing distribution system within the command area of Augmentation of Purbasthali piped water supply scheme at Palaspuli village (Mouza), Purbasthali-II Block under Burdwan Division, PHE Dte. Assistant Engineer ORD/000680/2020-2021 993./BWD 04/02/2021 45 IJABUL SEKH 51.07 0.00 0 1
80 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of AUGMENTATION OF PURBASTHALI Piped Water Supply Scheme at Purbasthali-II Block , SM/07866 Retrofitting Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of Augmentation of Purbasthali Piped Water Supply Scheme at Chupi Village (Mouza), Purbasthali-II Block under Burdwan Division, PHE Dte._2ND CALL Assistant Engineer ORD/000681/2020-2021 1589/BWD 22/02/2021 45 DHIRENDRA ENGINEERING & CONSTRUCTION 70.28 38.02 54.1 1
81 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of AUGMENTATION OF PURBASTHALI Piped Water Supply Scheme at Purbasthali-II Block , SM/07866 Retrofitting Supply of materials for different water supply scheme under Burdwan Division, PHE Dte. VCH/001237/2021-2022 1132/DW 26/02/2022 EXECUTIVE ENGINEER, RESOURCES DIVISION, P.H.E. DTE. 221.00 0.00 0 0
82 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of AUGMENTATION OF PURBASTHALI Piped Water Supply Scheme at Purbasthali-II Block , SM/07866 Retrofitting Extension of different dia UPVC Pipeline (suggested) as per survey of Horizon of Zone-III portion of Surface Based W/S Scheme in Arsenic Affected Areas of Purbasthali - II Block within Kalna Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer ORD/000009/2021-2022 3136/BWD 03/06/2021 60 ASHOK KUMAR GHOSH 34.74 34.29 98.7 1
83 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of AUGMENTATION OF PURBASTHALI Piped Water Supply Scheme at Purbasthali-II Block , SM/07866 Retrofitting Extension of different dia UPVC pipeline (suggested) as per survey of Horizon of Zone-I portion of surface based water supply scheme in Arsenic affected areas of Purbasthali-II Block within Kalna Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer ORD/000810/2020-2021 826/BWD 01/02/2021 60 DEY NIRMAN 24.83 2.77 11.16 1
84 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of AUGMENTATION OF PURBASTHALI Piped Water Supply Scheme at Purbasthali-II Block , SM/07866 Retrofitting Extension of different dia UPVC pipeline (suggested) as per survey of Horizon of Zone-IV portion of surface Based Water supply scheme in Arsenic affected areas of Purbasthali-II Block within Kalna Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer ORD/000865/2020-2021 754/BWD 29/01/2021 60 INVENT ENGINEERS CO. OPERATIVE SOCIETY LTD. 20.95 6.92 33.03 1
85 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of AUGMENTATION OF PURBASTHALI Piped Water Supply Scheme at Purbasthali-II Block , SM/07866 Retrofitting Construction of Pump House cum chlorine room (3.6 mtr x 3.0 mtr room) without sanitary and water supply arrangement at old Head Work Site of Purbasthali & it's adj. mouzas water supply scheme within Kalna Sub-Division under Burdwan Division, PHE Dte.^ (Sl No-C) Assistant Engineer ORD/000323/2021-2022 986/KSD Dt- 24.09.2021 24/09/2021 60 SURATH DEY 2.84 2.74 96.48 1
86 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of AUGMENTATION OF PURBASTHALI Piped Water Supply Scheme at Purbasthali-II Block , SM/07866 Retrofitting Laying of different dia UPVC pipe at the balance portion of different section for Augmentation of Purbasthali & its adjoining mouzas water supply scheme within Kalna Sub-Division, under Burdwan Division, PHE Dte.[Part-C][Gr.-C] Assistant Engineer ORD/000868/2020-2021 31/KSD 11/01/2021 45 INDIAN ENGINEERS CO.-OPERATIVE SOCIETY LTD. 4.68 0.00 0 1
87 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of AUGMENTATION OF PURBASTHALI Piped Water Supply Scheme at Purbasthali-II Block , SM/07866 Retrofitting Relaying of different dia UPVC pipeline at damaged portion as shown by Horizon of Zone-III of surface based water supply scheme within Kalna Sub-Division under Burdwan Division, PHE Dte.[SL-B] Assistant Engineer ORD/000959/2020-2021 148/KSD 12/02/2021 30 CHANCHAL PAL 4.82 0.00 0 1
88 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of AUGMENTATION OF PURBASTHALI Piped Water Supply Scheme at Purbasthali-II Block , SM/07866 Retrofitting Hire and labour charges for staging and scaffolding bamboo barricading and removal of rubbish for dismantling capacity 136 Cum of RCC Over Head Reservoir at Purbasthali & it's adj. mouzas water Supply Scheme within Kalna Sub Divison under Burdwan Division , PHE Dte. (Sl No-A) Assistant Engineer ORD/000327/2021-2022 967/KSD Dt-20.09.2021 20/09/2021 30 INVENT ENGINEERS CO. OPERATIVE SOCIETY LTD. 4.47 2.56 57.27 1
89 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of AUGMENTATION OF PURBASTHALI Piped Water Supply Scheme at Purbasthali-II Block , SM/07866 Retrofitting Work Order for "Providing Functional house hold tap connections for Sajal Gram Village within Purbasthali-II Block under Kalna Sub-Division under Burdwan Division, PHE Dte. (Purbasthali Aug & Kamalnagar water supply scheme)" JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000027/2023-2024 346/KSD 17/04/2023 30 RAJESH DAFADAR 0.88 0.84 95.45 100
90 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of AUGMENTATION OF PURBASTHALI Piped Water Supply Scheme at Purbasthali-II Block , SM/07866 Retrofitting Work Order for "Repairing and laying of UPVC pipeline of Majida, Nimdaha, Lakshmipur and Ukhura village for smooth running of FHTC work of Surface Based Water Supply Scheme within Kalna Sub-Division under Burdwan Division, PHE Dte." JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000548/2023-2024 1303/KSD 23/08/2023 15 PARTHA PRATIM ACHARYA 1.00 0.00 0 100
91 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of AUGMENTATION OF PURBASTHALI Piped Water Supply Scheme at Purbasthali-II Block , SM/07866 Retrofitting Material Requisition To Resource Division RTOR000120/2021-2022 1111/BWD 26/02/2022 Resource Division 37.62 0.00 0 0
92 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of AUGMENTATION OF PURBASTHALI Piped Water Supply Scheme at Purbasthali-II Block , SM/07866 Retrofitting Hire & fuel charges of vehicle Car No.-WB-41J-6795 for the month of June & July2023. BILL/01035/2023-2024 745/JJM 11/10/2023 MD HASIN 0.79 0.00 0 0
93 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of AUGMENTATION OF PURBASTHALI Piped Water Supply Scheme at Purbasthali-II Block , SM/07866 Retrofitting Providing functional household tap connection (FHTC) from existing distribution system within the command area of Augmentation of Purbasthali piped water supply scheme at Palaspuli village (Mouza), Purbasthali-II Block under burdwan Division, PHE Dte. Assistant Engineer ORD/000587/2020-2021 993/BWD 04/02/2021 45 IJABUL SEKH 51.07 31.50 61.68 0
94 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of AUGMENTATION OF PURBASTHALI Piped Water Supply Scheme at Purbasthali-II Block , SM/07866 Retrofitting Providing Functional Household Tap Connection (FHTC) at balance portion from existing distribution system within the command area of Aug. of PURBASTHALI Piped Water Supply Scheme at Chupi village (Mouza), Purbasthali - II Block under Burdwan Division, PHE Dte. Assistant Engineer ORD/000028/2022-2023 2079/BWD 20/04/2022 30 M/S K.P. CONSTRUCTION 39.64 22.64 57.11 100
95 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of AUGMENTATION OF PURBASTHALI Piped Water Supply Scheme at Purbasthali-II Block , SM/07866 Retrofitting Different Types of work involved in connection with Augmentation of 6 Nos. [(SM/07827), (SM/07866), (SM/16196), (SM/18314), (SM/16021), (SM/16019)] Piped Water Supply Scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/001144/2024-2025 618/BWD 11/02/2025 180 M/S DATTA ENTERPRISE 578.09 0.00 0 0
96 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting withinthe command area of Gopikantapur Piped Water Supply Scheme at Jamalpur Block , SM/07775 Retrofitting Supply of materials for different water supply scheme under Burdwan Division, PHE Dte. VCH/001237/2021-2022 1132/DW 26/02/2022 EXECUTIVE ENGINEER, RESOURCES DIVISION, P.H.E. DTE. 221.00 0.00 0 0
97 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting withinthe command area of Gopikantapur Piped Water Supply Scheme at Jamalpur Block , SM/07775 Retrofitting Formal Work Order for Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of Gopikantapur Piped Water Supply Scheme at Bishnubati, Chakdighi & Dhapdhara Village (Mouza), Jamalpur Block under Burdwan Division, PHE Dte. [Agreement No. 96/SE/CC/PHE/Dte of 2020-2021.] AE(HQs),Assistant Engineer ORD/000439/2020-2021 716/BWD 28/01/2021 45 BHARAT CONSTRUCTION 47.00 16.87 35.89 1
98 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting withinthe command area of Gopikantapur Piped Water Supply Scheme at Jamalpur Block , SM/07775 Retrofitting Hire & fuel charges of vehicle (Car No.-WB-41H-3668) for the office of the Assistant Engineer, RWS Burdwan Sub-Division, PHE Dte. for the month of May & June'22. VCH/000494/2022-2023 462/VEH/22-23 29/08/2022 MD HASIN 0.51 0.00 0 0
99 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting withinthe command area of Gopikantapur Piped Water Supply Scheme at Jamalpur Block , SM/07775 Retrofitting Formal Work Order for Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of Gopikantapur Piped Water Supply Scheme at Kubajpur, Pranballabhpur (2 Nos Habitation) & Ramchandrapur Village (Mouza), Jamalpur Block under Burdwan Division, PHE Dte. [Agreement No. 98/SE/CC/PHE/Dte of 2020-2021.] AE(HQs),Assistant Engineer ORD/000417/2020-2021 914/BWD 02/02/2021 60 S.S. CONSTRUCTION 62.95 29.05 46.15 1
100 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting withinthe command area of Gopikantapur Piped Water Supply Scheme at Jamalpur Block , SM/07775 Retrofitting Construction of 400 cum capacity 20 Mtr. staging height RCC Over Head Reservoir including pipe connection and cost of pipes, specials for Gopikantapur & it's adjoining mouzas W/S. scheme under Burdwan Division, P.H.E. Dte.Ref. Drawing No.PC-I/OHR/11/2012 (Sheet No.1&2)(R-I) Dated 20.06.2012. [Revision - 1 dt. 20.12.2012] AE(HQs),Assistant Engineer ORD/000438/2021-2022 696/BWD 02/02/2022 180 M/S JAN MAHAMMAD 76.26 0.00 0 0
101 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting withinthe command area of Gopikantapur Piped Water Supply Scheme at Jamalpur Block , SM/07775 Retrofitting Laying of uPVC pipeline due to obstruction arise for PWD roads within Gopikantapur W/S Scheme under Burdwan Division, PHE Dte. [Group: ¿F¿] AE(HQs),Assistant Engineer ORD/000222/2021-2022 1817/AE/HQ 21/09/2021 30 M/S S. CHOUDHURY 3.55 0.00 0 1
102 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting withinthe command area of Gopikantapur Piped Water Supply Scheme at Jamalpur Block , SM/07775 Retrofitting Extension of pipeline (Branch & Sub Branch) for Functional House Hold Tap Connection from existing distribution system within the command area of GOPIKANTAPUR Piped Water Supply Scheme, at Bhairabpur village, Jamalpur Block under Burdwan Division P.H.E Dte._Gr-H AE(HQs),Assistant Engineer ORD/000633/2021-2022 130/AE/HQ 04/03/2022 15 D.M. ENTERPRISE 2.37 0.00 0 1
103 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting withinthe command area of Gopikantapur Piped Water Supply Scheme at Jamalpur Block , SM/07775 Retrofitting Laying of HDPE and UPVC pipe for providing FHTC at Pranballabhpur Village within GOPIKANTAPUR Piped Water Supply Scheme, Jamalpur Block under Burdwan Division P.H.E Dte._Gr-G AE(HQs),Assistant Engineer ORD/000662/2021-2022 148/AE/HQ 16/03/2022 20 OM ENTERPRISE 4.80 0.00 0 1
104 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting withinthe command area of Gopikantapur Piped Water Supply Scheme at Jamalpur Block , SM/07775 Retrofitting Continuation work order for water tap connection in each house hold from existing distribution system within scheme jurisdiction in Bhairabpur Habitation of Gopikantapur piped water supply scheme within Headquarters under Burdwan Division, PHE Dte. AE(HQs),Assistant Engineer ORD/000562/2021-2022 4818/BWD 22/09/2021 30 D.M. ENTERPRISE 3.76 3.76 100 1
105 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting withinthe command area of Gopikantapur Piped Water Supply Scheme at Jamalpur Block , SM/07775 Retrofitting Laying of UPVC pipe for providing FHTC in different habitaion of Ramchandrapur, Pranballabpur Mouza within Gopikantapur piped water supply scheme within Jamalpur Block under Burdwan Division, PHE Dte. [Gr.-B] AE(HQs),Assistant Engineer ORD/000768/2021-2022 1856/AE/HQ 05/10/2021 30 M/S S. CHOUDHURY 4.82 4.82 100 1
106 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting withinthe command area of Gopikantapur Piped Water Supply Scheme at Jamalpur Block , SM/07775 Retrofitting Laying of uPVC pipe for providing FHTC at Gopikantapur, Ramchandrapur and Bishnubati Village within Gopikantapur Piped Water Supply Scheme, Jamalpur Block under Burdwan Division P.H.E Dte._Gr-G AE(HQs),Assistant Engineer ORD/000632/2021-2022 129/AE/HQ 04/03/2022 15 S.S. CONSTRUCTION 3.71 0.00 0 1
107 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting withinthe command area of Gopikantapur Piped Water Supply Scheme at Jamalpur Block , SM/07775 Retrofitting Material Requisition To Resource Division RTOR000117/2021-2022 1102/BWD 26/02/2022 Resource Division 8.61 0.00 0 0
108 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting withinthe command area of Gopikantapur Piped Water Supply Scheme at Jamalpur Block , SM/07775 Retrofitting Sinking of 300 mm X 200 mm dia Tube Well 150 mtr. Depth by D.R. Rig method using UPVC pipe (CM) and UPVC Medium Well Screen (RMS) with construction of Pump House & Boundary wall of GOPIKANTAPUR Piped Water Supply Scheme, Block- Jamalpur, District:- Purba-Bardhaman under Burdwan Division PHE Dte. [FOR 3rd. TUBE WELL SITE]. AE(HQs) Junior Engineer, Burdwan Division ORD/001043/2023-2024 786/BWD 27/02/2024 440 BIBHUTI SHAW 23.90 0.00 0 40
109 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting withinthe command area of Gopikantapur Piped Water Supply Scheme at Jamalpur Block , SM/07775 Retrofitting Preparation and Submission of DPR for Augmentation of Ground Water Based Piped Water Supply Scheme for GOPIKANTAPUR, Block:Jamalpur under Burdwan Division, P.H.E Dte. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000989/2024-2025 1911/BSD 28/08/2024 15 MEASURE LAND 0.78 0.00 0 0
110 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting withinthe command area of Gopikantapur Piped Water Supply Scheme at Jamalpur Block , SM/07775 Retrofitting Construction of Boundary wall, Land Development for various PWSS, Block- Jamalpur, District:- Purba-Bardhaman within Burdwan Sub Division under Burdwan Division PHE Dte. AE(HQs) ORD/001100/2024-2025 433/BWD 20/01/2025 120 RABINDRA NATH GORANG 132.64 0.00 0 0
111 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap connection (FHTC) by retrofitting within the command area of KAMARHATI Piped Water Supply Scheme at RAINA-II Block under Burdwan Division, P.H.E. DTE. , SM/08709 Retrofitting Water tap connection in each house hold from existing dist. System within Scheme jurisdiction in Katshimul village (Part) of Kamarhati (Zone-II) piped water supply scheme within Burdwan Sub-Division PHE Dte Part-A.Gr. D. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000214/2021-2022 1476/BSD 09/11/2021 30 MUNSHI JAVEDUR JAMAN 4.83 4.83 100 1
112 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap connection (FHTC) by retrofitting within the command area of KAMARHATI Piped Water Supply Scheme at RAINA-II Block under Burdwan Division, P.H.E. DTE. , SM/08709 Retrofitting Water tap connection in each house hold from existing dist. System within Scheme jurisdiction in Katshimul village (Part) of Kamarhati (Zone-II) piped water supply scheme within Burdwan Sub-Division PHE Dte Part-B..Gr. E. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000215/2021-2022 1477/BSD 09/11/2021 30 DUBE ENTERPRISE 4.83 4.80 99.38 1
113 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap connection (FHTC) by retrofitting within the command area of KAMARHATI Piped Water Supply Scheme at RAINA-II Block under Burdwan Division, P.H.E. DTE. , SM/08709 Retrofitting Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of Kamarhati Z-II Piped Water Supply Scheme at Gotan, Kamarhati & Jashapur Village (Mouza), Raina-II Block under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000235/2021-2022 6535/BWD 24/11/2021 60 KOUSIK MALLICK 71.10 66.22 93.14 1
114 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap connection (FHTC) by retrofitting within the command area of KAMARHATI Piped Water Supply Scheme at RAINA-II Block under Burdwan Division, P.H.E. DTE. , SM/08709 Retrofitting Extension of pipeline for KAMARHATI Water Supply Scheme FOR FHTC work at Jashapur village within Raina-II Block , under Burdwan Division, PHE Dte.Gr.C. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000465/2021-2022 276/BSD 15/02/2022 30 KOUSIK MALLICK 4.99 4.98 99.8 1
115 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap connection (FHTC) by retrofitting within the command area of KAMARHATI Piped Water Supply Scheme at RAINA-II Block under Burdwan Division, P.H.E. DTE. , SM/08709 Retrofitting Continuation work order for Water tap connection in each house hold from existing dist. System within Scheme jurisdiction in Katshimul village (Part) of Kamarhati (Zone-II) piped water supply scheme within Burdwan Sub-Division PHE Dte Part-B..Gr. E. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000308/2021-2022 1685/BSD 17/12/2021 30 DUBE ENTERPRISE 4.83 4.83 100 1
116 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap connection (FHTC) by retrofitting within the command area of KAMARHATI Piped Water Supply Scheme at RAINA-II Block under Burdwan Division, P.H.E. DTE. , SM/08709 Retrofitting Extension of pipeline for KAMARHATI Water Supply Scheme FOR FHTC work at Kamarhati village within Raina-II Block , under Burdwan Division, PHE Dte. (Zone-II). Gr.A. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000549/2021-2022 369/BSD 02/03/2022 30 DUBE ENTERPRISE 4.98 4.97 99.8 1
117 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap connection (FHTC) by retrofitting within the command area of KAMARHATI Piped Water Supply Scheme at RAINA-II Block under Burdwan Division, P.H.E. DTE. , SM/08709 Retrofitting Continuation work order for Water tap connection in each house hold from existing dist. System within Scheme jurisdiction in Katshimul village (Part) of Kamarhati (Zone-II) piped water supply scheme within Burdwan Sub-Division PHE Dte Part-A.Gr. D. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000307/2021-2022 1686/BSD 17/12/2021 30 MUNSHI JAVEDUR JAMAN 4.83 4.83 100 1
118 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap connection (FHTC) by retrofitting within the command area of KAMARHATI Piped Water Supply Scheme at RAINA-II Block under Burdwan Division, P.H.E. DTE. , SM/08709 Retrofitting Laying pipeline with FHTC for KAMARHATI Zone -II Water Supply Scheme at Kamarhati village (95 Nos.), Barati village (155 Nos.), Baidyapur village (110 Nos.), Jashapur village (125 Nos.) of Raina-II Block under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000164/2022-2023 3166/BWD 21/07/2022 45 ANWESHA CONSTRUCTION 31.48 31.37 99.65 1
119 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap connection (FHTC) by retrofitting within the command area of KAMARHATI Piped Water Supply Scheme at RAINA-II Block under Burdwan Division, P.H.E. DTE. , SM/08709 Retrofitting FHTC for KAMARHATI (Zone-II] Water Supply Scheme at Kamarhati village (36 Nos) of Raina-II Block under Burdwan Division, PHE Dte. [for 100% FHTC at Kamarhati village (Harghar Jal)] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000653/2022-2023 1367-A/BSD 04/08/2022 5 ANWESHA CONSTRUCTION 0.98 0.98 100 1
120 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap connection (FHTC) by retrofitting within the command area of KAMARHATI Piped Water Supply Scheme at RAINA-II Block under Burdwan Division, P.H.E. DTE. , SM/08709 Retrofitting FHTC for Kamarhati (Zone-II) Water Supply Scheme at Kamarhati Village (36 Nos) of Raina II Block under Burdwan Division, PHE Dte [For 100% FHTC at Kamarhati Village (Harghar Jal). Gr.J Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000342/2022-2023 1367/BSD 04/08/2022 5 ANWESHA CONSTRUCTION 0.98 0.00 0 1
121 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap connection (FHTC) by retrofitting within the command area of KAMARHATI Piped Water Supply Scheme at RAINA-II Block under Burdwan Division, P.H.E. DTE. , SM/08709 Retrofitting Extension of pipeline for KAMARHATI Water Supply Scheme FOR FHTC work at Barati and Badyapur village within Raina-II Block , under Burdwan Division, PHE Dte(Zone-II). Gr.D. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000442/2021-2022 200/BSD 01/02/2022 30 ARISTOCON ENGINEERS CO-OP SOCIETY LTD 4.80 4.74 98.75 1
122 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap connection (FHTC) by retrofitting within the command area of KAMARHATI Piped Water Supply Scheme at RAINA-II Block under Burdwan Division, P.H.E. DTE. , SM/08709 Retrofitting 225mm.Dia UPVC Pipeline at Node 11A to 11B of KAMARHATI(Zone-I)Water Supply Scheme within Raina-II Block , under Burdwan Division, PHE Dte. Gr.B. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000387/2021-2022 58/BSD 13/01/2022 30 INDIAN ENGINEERS CO.-OPERATIVE SOCIETY LTD. 2.99 0.00 0 1
123 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap connection (FHTC) by retrofitting within the command area of KAMARHATI Piped Water Supply Scheme at RAINA-II Block under Burdwan Division, P.H.E. DTE. , SM/08709 Retrofitting 225mm.Dia UPVC Pipeline at Node 86C-92,86-B-86C,86-A-86B,10-11-53-53A of KAMARHATI(Zone-I)Water Supply Scheme within Raina-II Block , under Burdwan Division, PHE Dte. Gr.C. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000388/2021-2022 59/BSD 13/01/2022 30 INDIAN ENGINEERS CO.-OPERATIVE SOCIETY LTD. 3.96 3.92 98.99 1
124 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap connection (FHTC) by retrofitting within the command area of KAMARHATI Piped Water Supply Scheme at RAINA-II Block under Burdwan Division, P.H.E. DTE. , SM/08709 Retrofitting Extension of pipeline for KAMARHATI Water Supply Scheme FOR FHTC work at Kamarhati village (Purba para,Pal para,Kana para,Pandit para, pashim para)within Raina-II Block, under Burdwan Division, PHE Dte. Gr.B. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000031/2022-2023 678/BSD 22/04/2022 30 BAMDEB CONSTRUCTION & CO 2.84 2.83 99.65 1
125 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap connection (FHTC) by retrofitting within the command area of KAMARHATI Piped Water Supply Scheme at RAINA-II Block under Burdwan Division, P.H.E. DTE. , SM/08709 Retrofitting Extension of pipeline for KAMARHATI Water Supply Scheme FOR FHTC work at GOTAN village within Raina II Block, under Burdwan Division, PHE Dte. Gr.A. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000674/2021-2022 534/BSD 28/03/2022 30 KOUSIK MALLICK 4.96 4.96 100 1
126 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap connection (FHTC) by retrofitting within the command area of KAMARHATI Piped Water Supply Scheme at RAINA-II Block under Burdwan Division, P.H.E. DTE. , SM/08709 Retrofitting Bullah pilling (92.0 mtr) at HD Works Site(North,East & South) for protection of Boundary wall beside irrigation canel of KAMARHATI ZONE-II W/S Scheme of RAINA-II Block at Burdwan Sub -Division within Burdwan Division, PHE Dte. Dist.-Purba Bardhaman.Gr.B. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000644/2021-2022 468/BSD 21/03/2022 15 JMD ENGINEERING INFRASTRUCTURE COMPANY 4.61 0.00 0 1
127 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap connection (FHTC) by retrofitting within the command area of KAMARHATI Piped Water Supply Scheme at RAINA-II Block under Burdwan Division, P.H.E. DTE. , SM/08709 Retrofitting Laying of interconnection of the Pump No.-1 & 2 with OHR and distribution main of 300 mm dia for Kamarhati (Zone-II) piped water supply scheme within Raina-II Block under Burdwan Division, PHE Dte.[Gr.-H] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000690/2021-2022 959/BSD 23/07/2021 30 JMD ENGINEERING INFRASTRUCTURE COMPANY 4.80 0.00 0 1
128 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap connection (FHTC) by retrofitting within the command area of KAMARHATI Piped Water Supply Scheme at RAINA-II Block under Burdwan Division, P.H.E. DTE. , SM/08709 Retrofitting Pipeline with FHTC for KAMARHATI ZONE -II Water Supply Scheme at Kamarhati village(80 NOS) of Raina-II Block,under Burdwan Division, PHE Dte. Group : C. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000111/2022-2023 1016/BSD 20/06/2022 30 D.M. ENTERPRISE 4.94 4.91 99.39 1
129 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap connection (FHTC) by retrofitting within the command area of KAMARHATI Piped Water Supply Scheme at RAINA-II Block under Burdwan Division, P.H.E. DTE. , SM/08709 Retrofitting Pipeline with FHTC for KAMARHATI ZONE -II Water Supply Scheme at Kamarhati village (52 Nos.) of Raina-II Block,under Burdwan Division, PHE Dte. Group : A. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000113/2022-2023 1035/BSD 20/06/2022 30 KOUSIK MALLICK 4.96 4.80 96.77 1
130 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap connection (FHTC) by retrofitting within the command area of KAMARHATI Piped Water Supply Scheme at RAINA-II Block under Burdwan Division, P.H.E. DTE. , SM/08709 Retrofitting Pipeline with FHTC for KAMARHATI ZONE -II Water Supply Scheme at Kamarhati village(70 NOS) of Raina-II Block,under Burdwan Division, PHE Dte. Group : B. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000110/2022-2023 1015/BSD 20/06/2022 30 KONAR ENTERPRISE 4.95 4.85 97.98 1
131 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap connection (FHTC) by retrofitting within the command area of KAMARHATI Piped Water Supply Scheme at RAINA-II Block under Burdwan Division, P.H.E. DTE. , SM/08709 Retrofitting Land Development(at entrance)of Head Works Site of of KAMARHATI ZONE-II PIPED Water Supply Scheme at RAINA-II Block within Burdwan Sub-Division under Burdwan Division, PHE Dte. Group : F. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000108/2022-2023 988/BSD 16/06/2022 15 JMD ENGINEERING INFRASTRUCTURE COMPANY 1.85 0.00 0 1
132 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap connection (FHTC) by retrofitting within the command area of KAMARHATI Piped Water Supply Scheme at RAINA-II Block under Burdwan Division, P.H.E. DTE. , SM/08709 Retrofitting Formal Work Order for Laying distribution system including providing house connection at Nizampur, Daminya village (Mouza) of KAMARHATI Piped W/S. Scheme (Zone-I) at Raina - II Block under Burdwan Division, PHE. Dte.(Part-B) _2ND CALL. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000934/2020-2021 1601/BWD 22/02/2021 90 INDIAN ENGINEERS CO.-OPERATIVE SOCIETY LTD. 184.73 143.36 77.61 100
133 PURBA BARDHAMAN Burdwan Division Augmentation of ground water based RAINA PWSS to accommodate FHTC in Raina-I block under Burdwan Sub Division of Burdwan Division in Purba Bardhaman District , SM/09493 Augmentation Supply of materials for different water supply scheme under Burdwan Division, PHE Dte. VCH/001578/2021-2022 1207/DW 10/03/2022 EXECUTIVE ENGINEER, RESOURCES DIVISION, P.H.E. DTE. 3,005.00 0.00 0 0
134 PURBA BARDHAMAN Burdwan Division Augmentation of ground water based RAINA PWSS to accommodate FHTC in Raina-I block under Burdwan Sub Division of Burdwan Division in Purba Bardhaman District , SM/09493 Augmentation Route Survey & Preparation of DPR for Raina W/S Scheme under Raina-I Block under Burdwan Sub-Division under Burdwan Division PHE Dte. Sl No.12. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000501/2021-2022 187/BSD 31/01/2022 30 RADIANT 2.72 2.71 99.63 1
135 PURBA BARDHAMAN Burdwan Division Augmentation of ground water based RAINA PWSS to accommodate FHTC in Raina-I block under Burdwan Sub Division of Burdwan Division in Purba Bardhaman District , SM/09493 Augmentation Quotation for shifting of 11 KV Raina Local Feeder at Raina PHE under Burdwan South Division, WBSEDCL.[Ref ID-860249099, App ID-100000061079, dt.-22/09/2022] VCH/000558/2022-2023 675/DW/22-23 29/09/2022 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LTD. 4.94 0.00 0 0
136 PURBA BARDHAMAN Burdwan Division Augmentation of ground water based RAINA PWSS to accommodate FHTC in Raina-I block under Burdwan Sub Division of Burdwan Division in Purba Bardhaman District , SM/09493 Augmentation Supply of 100 mm dia C.I. Sluice valve (P.N.-I) of Augmentation of Raina water supply scheme of Raina-I under Burdwan sub division, PHE Dte. Gr.C. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000572/2022-2023 1851/BSD 21/10/2022 15 SINHA BROTHERS 0.47 0.47 100 1
137 PURBA BARDHAMAN Burdwan Division Augmentation of ground water based RAINA PWSS to accommodate FHTC in Raina-I block under Burdwan Sub Division of Burdwan Division in Purba Bardhaman District , SM/09493 Augmentation Laying Distribution of 160 mm dia HDPE pipeline for Augmentation of RAINA Piped Water Supply Scheme AT NODE 138 to 135, 135 to 119, 119 to 114, 114 to 110 to 105, 105 to 93 within Burdwan Sub-Division under Burdwan Division, PHE Dte. Gr.B. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000365/2022-2023 1404/BSD 10/08/2022 45 RANADHIR SINHA 4.77 3.53 74 0
138 PURBA BARDHAMAN Burdwan Division Augmentation of ground water based RAINA PWSS to accommodate FHTC in Raina-I block under Burdwan Sub Division of Burdwan Division in Purba Bardhaman District , SM/09493 Augmentation Restoration work at various location at Thanar Danga to Nandipara Kalitala via.Ranapara and Raina Co-Operative Society of Augmentation of Raina Water Supply Scheme at Raina-I Block within under Burdwan Division,PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000180/2023-2024 1004/BSD 06/06/2023 15 SOUMYAVASH DAS 0.95 0.94 98.95 100
139 PURBA BARDHAMAN Burdwan Division Augmentation of ground water based RAINA PWSS to accommodate FHTC in Raina-I block under Burdwan Sub Division of Burdwan Division in Purba Bardhaman District , SM/09493 Augmentation Sinking of 300 X 200mm dia Tube Well 150 mtr. Depth by D.R. Rig method using UPVC pipe (CD) and UPVC Deep Well Screen (RDS) for Aug. of RAINA W/S Scheme (H.W SITE) under Raina-I Block within Burdwan Sub-Division, PHE Dte. [For 01 No. Tube well]. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000190/2023-2024 2697/BWD 08/06/2023 30 RANADHIR SINHA 13.20 11.37 86.14 100
140 PURBA BARDHAMAN Burdwan Division Augmentation of ground water based RAINA PWSS to accommodate FHTC in Raina-I block under Burdwan Sub Division of Burdwan Division in Purba Bardhaman District , SM/09493 Augmentation Material Requisition To Resource Division RTOR000060/2021-2022 559/BWD 27/01/2022 Resource Division 12.84 0.00 0 0
141 PURBA BARDHAMAN Burdwan Division Augmentation of ground water based RAINA PWSS to accommodate FHTC in Raina-I block under Burdwan Sub Division of Burdwan Division in Purba Bardhaman District , SM/09493 Augmentation Material Requisition To Resource Division RTOR000095/2021-2022 932/BWD 16/02/2022 Resource Division 23.01 0.00 0 0
142 PURBA BARDHAMAN Burdwan Division Augmentation of ground water based RAINA PWSS to accommodate FHTC in Raina-I block under Burdwan Sub Division of Burdwan Division in Purba Bardhaman District , SM/09493 Augmentation Material Requisition To Resource Division RTOR000217/2021-2022 1540/BWD 15/03/2022 Resource Division 0.37 0.00 0 0
143 PURBA BARDHAMAN Burdwan Division Augmentation of ground water based RAINA PWSS to accommodate FHTC in Raina-I block under Burdwan Sub Division of Burdwan Division in Purba Bardhaman District , SM/09493 Augmentation Quotation for new service connection of Augmentation of Raina water supply scheme.[REF ID-503550762][TW-3] BILL/01691/2023-2024 1367/JJM 20/02/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LTD. 3.08 0.00 0 0
144 PURBA BARDHAMAN Burdwan Division Augmentation of ground water based RAINA PWSS to accommodate FHTC in Raina-I block under Burdwan Sub Division of Burdwan Division in Purba Bardhaman District , SM/09493 Augmentation Augmentation of RAINA Piped Water Supply Scheme with LDS, FHTC, Rising Main & Construction of 300 Cum capacity OHR with 20.0 Mtr. Staging height inclusive of soil test under Raina ¿ I Block, District - Purba Bardhaman. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000600/2021-2022 1475/BWD 14/03/2022 360 RANADHIR SINHA 319.21 251.96 78.93 100
145 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED KAITHAN PWSS TO ACCOMMODATE FHTC IN KATWA-I BLOCK UNDER KATWA SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/09568 Augmentation Route Survey and preparation of DPR for KAITHAN PWSS under Katwa-I & II Block under Katwa Sub-Division under Burdwan Division PHE Dte. [Sl No-02] Assistant Engineer ORD/000538/2021-2022 45/KTS 24/01/2022 21 RADIANT 2.59 2.59 100 1
146 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED KAITHAN PWSS TO ACCOMMODATE FHTC IN KATWA-I BLOCK UNDER KATWA SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/09568 Augmentation Supply of materials for different water supply scheme under Burdwan Division, PHE Dte. VCH/001578/2021-2022 1207/DW 10/03/2022 EXECUTIVE ENGINEER, RESOURCES DIVISION, P.H.E. DTE. 3,005.00 0.00 0 0
147 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED KAITHAN PWSS TO ACCOMMODATE FHTC IN KATWA-I BLOCK UNDER KATWA SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/09568 Augmentation Supply and delivery of different dia. CIDF sluice valve for Augmentation of Baharan-Birampur, Kaithan, Majhigram-Sigot & Ketugram (Zone-I & II) Piped Water Supply Scheme within Katwa Sub-Division under Burdwan Division, P.H.E. Dte. Assistant Engineer ORD/000518/2022-2023 4702/BWD 19/10/2022 20 SSPR VALVE MANUFACTURING PVT LTD. 14.45 7.22 49.97 1
148 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED KAITHAN PWSS TO ACCOMMODATE FHTC IN KATWA-I BLOCK UNDER KATWA SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/09568 Augmentation Material Requisition To Resource Division RTOR000164/2021-2022 1324/BWD 08/03/2022 Resource Division 17.01 0.00 0 0
149 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED KAITHAN PWSS TO ACCOMMODATE FHTC IN KATWA-I BLOCK UNDER KATWA SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/09568 Augmentation Material Requisition To Resource Division RTOR000182/2021-2022 1377/BWD 09/03/2022 Resource Division 4.13 0.00 0 0
150 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED KAITHAN PWSS TO ACCOMMODATE FHTC IN KATWA-I BLOCK UNDER KATWA SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/09568 Augmentation Material Requisition To Resource Division RTOR000057/2021-2022 547/BWD 27/01/2022 Resource Division 17.27 0.00 0 0
151 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED KAITHAN PWSS TO ACCOMMODATE FHTC IN KATWA-I BLOCK UNDER KATWA SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/09568 Augmentation Material Requisition To Resource Division RTOR000231/2021-2022 1542/BWD 15/03/2022 Resource Division 0.37 0.00 0 0
152 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED KAITHAN PWSS TO ACCOMMODATE FHTC IN KATWA-I BLOCK UNDER KATWA SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/09568 Augmentation Material Requisition To Resource Division RTOR000112/2021-2022 1089/BWD 25/02/2022 Resource Division 32.22 0.00 0 0
153 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED KAITHAN PWSS TO ACCOMMODATE FHTC IN KATWA-I BLOCK UNDER KATWA SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/09568 Augmentation Augmentation of KAITHAN Piped Water Supply Scheme with LDS, FHTC, Rising Main, Construction of 350 Cum capacity OHR with 20.0 Mtr. Staging height inclusive of soil investigation including repairing of pump house at Head Works & 2nd TW site under Katwa ¿ I Block, District - Purba Bardhaman. Assistant Engineer JUNIOR ENGINEER KATWA SUB-DIVISION PHE DTE ORD/000018/2022-2023 2007/BWD 13/04/2022 360 VISHAL CONSTRUCTION CO. 365.96 346.36 94.64 95
154 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED KAITHAN PWSS TO ACCOMMODATE FHTC IN KATWA-I BLOCK UNDER KATWA SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/09568 Augmentation Construction of Boundary Wall at Head Work site of KAITHAN PWSS under Katwa-I Block under Katwa Sub-Division within Burdwan Sub-Division PHE Dte. Assistant Engineer JUNIOR ENGINEER KATWA SUB-DIVISION PHE DTE ORD/000856/2023-2024 5200/BWD 29/11/2023 30 SUBODH KUMAR MONDAL 22.82 0.00 0 75
155 PURBA BARDHAMAN Burdwan Division Augmentation of Sajiara PWSS for providing FHTC under Baurdwan Division. , SM/09716 Augmentation Augmentation of SAJIARA Piped Water Supply Scheme with LDS, Rising Main, Switch Room (with & without water supply & sanitary arrangements), Construction 300 Cum capacity OHR with 20.0 Mtr. Staging height inclusive of soil test & Construction of Boundary wall under Kalna Sub-Division, Block - Purbasthali - II, Dist. - Purba Bardhaman under Burdwan Division, PHE. Dte. Assistant Engineer ORD/000432/2021-2022 645/BWD 01/02/2022 360 UNICON INDIA 318.07 14.00 4.4 0
156 PURBA BARDHAMAN Burdwan Division Augmentation of Sajiara PWSS for providing FHTC under Baurdwan Division. , SM/09716 Augmentation Supply of materials for different water supply scheme under Burdwan Division, PHE Dte. VCH/001578/2021-2022 1207/DW 10/03/2022 EXECUTIVE ENGINEER, RESOURCES DIVISION, P.H.E. DTE. 3,005.00 0.00 0 0
157 PURBA BARDHAMAN Burdwan Division Augmentation of Sajiara PWSS for providing FHTC under Baurdwan Division. , SM/09716 Augmentation Preparation of DPR for augmentation of Sajiara W/S Scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. (Sl No-D) Assistant Engineer ORD/000516/2021-2022 184/KSD 21/02/2022 21 M/S R. DUTTA & CO. 2.88 2.88 100 1
158 PURBA BARDHAMAN Central Mechanical Augmentation of Sajiara PWSS for providing FHTC under Baurdwan Division. , SM/09716 Augmentation Supply & Installation of Submersible Pumping Machinery , Voltage Stabilizer, Chlorination system and internal House wiring for Tube well no.- 1 & 2 at Augumentation of Sajiara Water Supply Scheme under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000064/2023-2024 2567/CMD 06/06/2023 30 AMUSAR IMPEX PVT. LTD. 21.95 0.00 0 0
159 PURBA BARDHAMAN Burdwan Division Augmentation of Sajiara PWSS for providing FHTC under Baurdwan Division. , SM/09716 Augmentation Work Order for "Construction of Pump house cum chlorine room without sanitary (Size 3.60 mtr x 3.00 mtr room) at 2nd Tube well site for augmentation of Sajiara Water Supply Scheme for providing Functional Household Tap Connection (FHTC) within Kalna Sub-Division under Burdwan Division, PHE Dte.^". JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000552/2023-2024 1307/KSD 23/08/2023 60 BUILD-TECH 3.02 0.00 0 0
160 PURBA BARDHAMAN Burdwan Division Augmentation of Sajiara PWSS for providing FHTC under Baurdwan Division. , SM/09716 Augmentation Material Requisition To Resource Division RTOR000031/2021-2022 546/BWD 27/01/2022 Resource Division 15.25 0.00 0 0
161 PURBA BARDHAMAN Burdwan Division Augmentation of Sajiara PWSS for providing FHTC under Baurdwan Division. , SM/09716 Augmentation Material Requisition To Resource Division RTOR000147/2021-2022 1244/BWD 07/03/2022 Resource Division 2.64 0.00 0 0
162 PURBA BARDHAMAN Burdwan Division Augmentation of Sajiara PWSS for providing FHTC under Baurdwan Division. , SM/09716 Augmentation Material Requisition To Resource Division RTOR000171/2021-2022 1339/BWD 08/03/2022 Resource Division 53.75 0.00 0 0
163 PURBA BARDHAMAN Burdwan Division Augmentation of Sajiara PWSS for providing FHTC under Baurdwan Division. , SM/09716 Augmentation Material Requisition To Resource Division RTOR000241/2021-2022 1565/BWD 15/03/2022 Resource Division 0.37 0.00 0 0
164 PURBA BARDHAMAN Burdwan Division Augmentation of Sajiara PWSS for providing FHTC under Baurdwan Division. , SM/09716 Augmentation Material Requisition To Resource Division RTOR000021/2022-2023 3274/BWD 29/07/2022 Resource Division 34.57 0.00 0 0
165 PURBA BARDHAMAN Burdwan Division Augmentation of Sajiara PWSS for providing FHTC under Baurdwan Division. , SM/09716 Augmentation Construction of Pump House cum chlorine room with sanitary and water supply arrangement at Head Work Site for augmentation of SAJIARA according to departmental drawing No-PHE/BD/P.H/DRG-01/DEC-2017 (Size 3.30 mtr x 3.60 mtr room with 1.2 Mtr. wide verandah) to provide house connection within Kalna Sub-Division under Burdwan Division, PHE Dte._2ND CALL Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000964/2023-2024 5713/BWD 29/12/2023 60 DEL DELTA CONSTRUCTION 5.20 0.00 0 0
166 PURBA BARDHAMAN Burdwan Division Augmentation of Sajiara PWSS for providing FHTC under Baurdwan Division. , SM/09716 Augmentation Quotation from WBSEDCL for Load Enhancement charges of Sajiara water supply scheme of PH-1. under Burdwan Division, PHE Dte. BILL/01725/2023-2024 1402/JJM 29/02/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LTD. 0.32 0.00 0 0
167 PURBA BARDHAMAN Burdwan Division Augmentation of Sajiara PWSS for providing FHTC under Baurdwan Division. , SM/09716 Augmentation Work Order for "Construction of Pump house cum chlorine room without sanitary (Size 3.60 mtr x 3.00 mtr room) at 2nd Tube well site for augmentation of Sajiara Water Supply Scheme for providing Functional Household Tap Connection (FHTC) within Kalna Sub-Division under Burdwan Division, PHE Dte.^". Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000559/2023-2024 1307/KSD 23/08/2023 60 BUILD-TECH 3.02 0.00 0 0
168 PURBA BARDHAMAN Burdwan Division Augmentation of Sajiara PWSS for providing FHTC under Baurdwan Division. , SM/09716 Augmentation Laying distribution system for augmentation of SAJIARA W/S Scheme to provide house connection within Kalna Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000512/2023-2024 3554/BWD 11/08/2023 45 SK RAJU 42.39 15.10 35.62 40
169 PURBA BARDHAMAN Burdwan Division Augmentation of Sajiara PWSS for providing FHTC under Baurdwan Division. , SM/09716 Augmentation Laying of Rising Main for Augmentation of SAJIARA Piped Water Supply Scheme to provide house connection within Kalna Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000597/2023-2024 3766/BWD 29/08/2023 30 CHOWDHURY CONSTRUCTION 8.19 0.00 0 2
170 PURBA BARDHAMAN Burdwan Division Augmentation of Sajiara PWSS for providing FHTC under Baurdwan Division. , SM/09716 Augmentation Sinking of 250 X 150mm dia Tube Well 150 mtr. Depth by D.R. Rig method using UPVC pipe (CD) and UPVC Deep Well Screen (RDS) at 1st & 2nd Tubewell site for SAJIARA Piped Water Supply Scheme, Block - Purbasthali - II, Dist - Purba Bardhaman under Burdwan Division, PHE Dte. [2 Nos. GTW]. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000012/2022-2023 1960/BWD 12/04/2022 45 ACME CONSTRUCTION 14.81 6.81 45.98 100
171 PURBA BARDHAMAN Burdwan Division Augmentation of Sajiara PWSS for providing FHTC under Baurdwan Division. , SM/09716 Augmentation Construction of boundary wall of SAJIARA Piped water supply Scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. (Length -150 Mtr, No of Columns-43 Nos. Centre to Centre- 3.5 Mtr.) With Double Tie Beam. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000598/2023-2024 4172/BWD 21/09/2023 30 HAIDER ALI MONDAL 14.53 0.00 0 80
172 PURBA BARDHAMAN Burdwan Division Augmentation of Sajiara PWSS for providing FHTC under Baurdwan Division. , SM/09716 Augmentation Different types of works involve in connection with Augmentation of SAJIARA (SM/09716), NAMA BHANDARTIKURI (SM/14917) Piped water supply scheme under Purbasthali-II Block, Kalna Sub-Division, PHE Dte. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000394/2024-2025 3010/BWD 02/08/2024 240 PRATIMA CONSTRUCTION 79.16 0.00 0 2
173 PURBA BARDHAMAN Burdwan Division Augmentation of Sajiara PWSS for providing FHTC under Baurdwan Division. , SM/09716 Augmentation WBSEDCL Quotation for new service connection Sajiara TW. NO.-05 BILL/01637/2024-2025 null 06/03/2025 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.79 0.00 0 null
174 PURBA BARDHAMAN Burdwan Division Augmentation of Sajiara PWSS for providing FHTC under Baurdwan Division. , SM/09716 Augmentation WBSEDCL Quotation for new service connection Sajiara TW. NO.-04 BILL/01636/2024-2025 null 06/03/2025 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 5.69 0.00 0 null
175 PURBA BARDHAMAN Burdwan Division Augmentation of Patuli PWSS for providing FHTC under Burdwan Divison. , SM/09718 Augmentation Supply of materials for different water supply schemes under Burdwan Division, PHE Dte. VCH/001555/2021-2022 1194/DW 10/03/2022 EXECUTIVE ENGINEER, RESOURCES DIVISION, P.H.E. DTE. 62.76 0.00 0 0
176 PURBA BARDHAMAN Burdwan Division Augmentation of Patuli PWSS for providing FHTC under Burdwan Divison. , SM/09718 Augmentation Supply of materials for different water supply scheme under Burdwan Division, PHE Dte. VCH/001578/2021-2022 1207/DW 10/03/2022 EXECUTIVE ENGINEER, RESOURCES DIVISION, P.H.E. DTE. 3,005.00 0.00 0 0
177 PURBA BARDHAMAN Burdwan Division Augmentation of Patuli PWSS for providing FHTC under Burdwan Divison. , SM/09718 Augmentation Preparation of DPR for augmentation of Patuli W/S Scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. (Sl No-A) Assistant Engineer ORD/000513/2021-2022 181/KSD 21/02/2022 21 M/S R. DUTTA & CO. 3.75 3.81 101.6 1
178 PURBA BARDHAMAN Central Mechanical Augmentation of Patuli PWSS for providing FHTC under Burdwan Divison. , SM/09718 Augmentation Supply & Installation of Submersible Pumping Machinery , Voltage Stabilizer, Chlorination system and internal House wiring for Tube well no.- 1 & 2 at Augumentation of Patuli (Zone - II) Water Supply Scheme under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000065/2023-2024 2566/CMD 06/06/2023 30 M/S. S.R. ENTERPRISE 21.77 0.00 0 0
179 PURBA BARDHAMAN Burdwan Division Augmentation of Patuli PWSS for providing FHTC under Burdwan Divison. , SM/09718 Augmentation Load enhancement charges of Aug of Patuli water supply scheme under Burdwan Division, PHE Dte. BILL/00563/2023-2024 665/JJM 21/09/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LTD. 9.03 0.00 0 0
180 PURBA BARDHAMAN Burdwan Division Augmentation of Patuli PWSS for providing FHTC under Burdwan Divison. , SM/09718 Augmentation Material Requisition To Resource Division RTOR000018/2021-2022 7348/BWD 30/12/2021 Resource Division 13.73 0.00 0 0
181 PURBA BARDHAMAN Burdwan Division Augmentation of Patuli PWSS for providing FHTC under Burdwan Divison. , SM/09718 Augmentation Material Requisition To Resource Division RTOR000183/2021-2022 1378/BWD 09/03/2022 Resource Division 4.45 0.00 0 0
182 PURBA BARDHAMAN Burdwan Division Augmentation of Patuli PWSS for providing FHTC under Burdwan Divison. , SM/09718 Augmentation Material Requisition To Resource Division RTOR000165/2021-2022 1325/BWD 08/03/2022 Resource Division 74.18 0.00 0 0
183 PURBA BARDHAMAN Burdwan Division Augmentation of Patuli PWSS for providing FHTC under Burdwan Divison. , SM/09718 Augmentation Material Requisition To Resource Division RTOR000033/2021-2022 557/BWD 27/01/2022 Resource Division 22.05 0.00 0 0
184 PURBA BARDHAMAN Burdwan Division Augmentation of Patuli PWSS for providing FHTC under Burdwan Divison. , SM/09718 Augmentation Material Requisition To Resource Division RTOR000233/2021-2022 1557/BWD 15/03/2022 Resource Division 0.00 0.00 NAN 0
185 PURBA BARDHAMAN Burdwan Division Augmentation of Patuli PWSS for providing FHTC under Burdwan Divison. , SM/09718 Augmentation Material Requisition To Resource Division RTOR000097/2021-2022 769/BWD 07/02/2022 Resource Division 51.93 0.00 0 0
186 PURBA BARDHAMAN Burdwan Division Augmentation of Patuli PWSS for providing FHTC under Burdwan Divison. , SM/09718 Augmentation Work Order for "Replacement of Valve and Restoration of Concrete Roads at Patuli Water Supply Scheme within Kalna Sub-Division under Burdwan Division, PHE Dte." JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000549/2023-2024 1304/KSD 23/08/2023 30 IYASIN DAFADAR 4.09 4.04 98.78 100
187 PURBA BARDHAMAN Burdwan Division Augmentation of Patuli PWSS for providing FHTC under Burdwan Divison. , SM/09718 Augmentation Work Order for " Restoration of Pipeline and Other Allied Works i.c.w. Augmentation of PATULI(SM/09718) Piped Water Supply Scheme under PURBASTHALI-II Block,Kalna Sub-Division, District:- Purba Bardhaman." Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/001187/2023-2024 2191/KSD 15/03/2024 10 IYASIN DAFADAR 4.52 0.00 0 2
188 PURBA BARDHAMAN Burdwan Division Augmentation of Patuli PWSS for providing FHTC under Burdwan Divison. , SM/09718 Augmentation Augmentation of PATULI Water Supply Scheme (Zone-I & II) with LDS, Rising Main, FHTC work, Pump House & Boundary Wall of Purbasthali - II Block in Kalna Sub-Division, District - Purba Bardhaman under Burdwan Division, PHE. Dte. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000384/2021-2022 256/BWD 13/01/2022 180 IJABUL SEKH 407.57 365.05 89.57 80
189 PURBA BARDHAMAN Burdwan Division Augmentation of Patuli PWSS for providing FHTC under Burdwan Divison. , SM/09718 Augmentation Quotation from WBSEDCL for new service connection of Augmentation of Patuli TW-3 Water supply scheme under Burdwan Division, PHE Dte. BILL/00666/2024-2025 826/JJM 18/09/2024 WBSEDCL 7.53 0.00 0 0
190 PURBA BARDHAMAN Burdwan Division Augmentation of Patuli PWSS for providing FHTC under Burdwan Divison. , SM/09718 Augmentation Sinking of 250 X 150mm dia Tube Well 150 mtr. Depth by D.R. Rig method using UPVC pipe (CD) and UPVC Deep Well Screen (RDS) at H.W & 2nd Tubewell site for PATULI (Zone-I & II) Piped Water Supply Scheme, Block - Purbasthali - II, Dist - Purba Bardhaman under Burdwan Division, PHE Dte. [2 + 2 = 4 Nos. GTW]. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000640/2021-2022 1621/BWD 21/03/2022 1025 AUXILIARY TUBE WELL DRILLERS 31.66 7.65 24.16 50
191 PURBA BARDHAMAN Burdwan Division Augmentation of Patuli PWSS for providing FHTC under Burdwan Divison. , SM/09718 Augmentation Different types of works involve in connection with Augmentation of JHAUDANGA (SM/16293), KASHIPUR (SM/16297), PATULI (SM/09718) & PARULIA (SM/09719) Piped water supply scheme under Purbasthali-II Block, Kalna Sub-Division, PHE Dte. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000163/2024-2025 2202/BWD 13/06/2024 360 MONDAL PRECISION PVT LTD 570.00 0.00 0 2
192 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED SASINARA ZONE II PWSS TO ACCOMMODATE FHTC IN MEMARI-I BLOCK UNDER BURDWAN SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/10056 Augmentation Supply of materials for different water supply scheme under Burdwan Division, PHE Dte. VCH/001578/2021-2022 1207/DW 10/03/2022 EXECUTIVE ENGINEER, RESOURCES DIVISION, P.H.E. DTE. 3,005.00 0.00 0 0
193 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED SASINARA ZONE II PWSS TO ACCOMMODATE FHTC IN MEMARI-I BLOCK UNDER BURDWAN SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/10056 Augmentation Route Survey & Preparation of DPR for Sasinara (Zone-II) & (Zone-III) W/S Scheme under Burdwan-II Block under Burdwan Sub-Division under Burdwan Division PHE Dte. Sl No.2. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000491/2021-2022 177/BSD 31/01/2022 30 RADIANT 3.76 1.88 50 1
194 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED SASINARA ZONE II PWSS TO ACCOMMODATE FHTC IN MEMARI-I BLOCK UNDER BURDWAN SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/10056 Augmentation Material Requisition To Resource Division RTOR000175/2021-2022 1332/BWD 08/03/2022 Resource Division 108.97 0.00 0 0
195 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED SASINARA ZONE II PWSS TO ACCOMMODATE FHTC IN MEMARI-I BLOCK UNDER BURDWAN SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/10056 Augmentation Material Requisition To Resource Division RTOR000223/2021-2022 1546/BWD 15/03/2022 Resource Division 0.37 0.00 0 0
196 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED SASINARA ZONE II PWSS TO ACCOMMODATE FHTC IN MEMARI-I BLOCK UNDER BURDWAN SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/10056 Augmentation Material Requisition To Resource Division RTOR000195/2021-2022 1387/BWD 09/03/2022 Resource Division 4.83 0.00 0 0
197 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED SASINARA ZONE II PWSS TO ACCOMMODATE FHTC IN MEMARI-I BLOCK UNDER BURDWAN SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/10056 Augmentation Material Requisition To Resource Division RTOR000044/2022-2023 4851/BWD 20/10/2022 Resource Division 10.47 0.00 0 0
198 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED SASINARA ZONE II PWSS TO ACCOMMODATE FHTC IN MEMARI-I BLOCK UNDER BURDWAN SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/10056 Augmentation Sinking of 300 X 200mm dia Tube Well 150 mtr. Depth by D.R. Rig method using UPVC pipe (CD) and UPVC Deep Well Screen (RDS) for SASINARA Z-II W/S Scheme at Kalsi Mouza, RASULPUR W/S Scheme at 4th TW site & ALIPUR W/S Scheme at 4th TW site under Memari-I Block under within Burdwan Sub-Division, PHE Dte. [For 3 Nos. Tube well]. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000159/2023-2024 2455/BWD 31/05/2023 60 SUSUNIA GP CO. OPERATIVE LABOUR CONTRACT AND CONSTRUCTION SOCIETY LTD. 39.76 13.40 33.7 100
199 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED SASINARA ZONE II PWSS TO ACCOMMODATE FHTC IN MEMARI-I BLOCK UNDER BURDWAN SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/10056 Augmentation Quotation for WBSEDCL for New Service connection of Sasinara Z-II TW-3 water supply scheme. BILL/01244/2023-2024 1149/JJM 29/12/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LTD. 6.03 0.00 0 0
200 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED SASINARA ZONE II PWSS TO ACCOMMODATE FHTC IN MEMARI-I BLOCK UNDER BURDWAN SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/10056 Augmentation Construction of switch rooms & Rising main at different TW site for SASINARA (Zone-II) Piped Water Supply Scheme under Memari - I Block, District:- Purba-Bardhaman under Burdwan Division, PHE. Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000654/2023-2024 4165/BWD 20/09/2023 60 PAL CONSTRUCTION 9.12 3.34 36.62 100
201 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED SASINARA ZONE II PWSS TO ACCOMMODATE FHTC IN MEMARI-I BLOCK UNDER BURDWAN SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/10056 Augmentation Providing Balance Functional Household Tap Connection (850nos FHTC) from existing distribution system within the command area of SASINARA ZONE-II Piped Water Supply Scheme at (Sasinara, Kalsi, Debipur, Amadpur, Maheshpur, Mobarakpur) Mouza, Construction of boundary wall at head work site, 2nd T/W & 3rd T/W site under MEMARI-I Block of Burdwan Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000531/2023-2024 3628/BWD 21/08/2023 60 A R TRADERS 69.40 20.94 30.17 99
202 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED SASINARA ZONE II PWSS TO ACCOMMODATE FHTC IN MEMARI-I BLOCK UNDER BURDWAN SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/10056 Augmentation Augmentation of SASINARA ZONE-II Piped Water Supply Scheme with LDS, FHTC, Rising main, Construction of 350 cum capacity OHR with 20.0 mtr. Staging height inclusive of soil investigation under MEMARI- I Block, District:- Purba-Burdwan. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000123/2022-2023 2929/BWD 28/06/2022 885 ASHOK KUMAR GHOSH 481.08 400.05 83.16 100
203 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED MOUGRAM (ZONE-I & II) PWSS TO ACCOMMODATE FHTC IN KETUGRAM-II BLOCK UNDER KATWA SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/10123 Augmentation Route Survey and Preparation of DPR for MOUGRAM (ZONE-I & II) PWSS under Ketugram-II Block under Katwa Sub-Division under Burdwan Division PHE Dte. [Sl No-07] Assistant Engineer ORD/000548/2021-2022 67/KTS 27/01/2022 21 RADIANT 4.11 4.11 100 1
204 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED MOUGRAM (ZONE-I & II) PWSS TO ACCOMMODATE FHTC IN KETUGRAM-II BLOCK UNDER KATWA SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/10123 Augmentation Supply of materials for different water supply scheme under Burdwan Division, PHE Dte. VCH/001578/2021-2022 1207/DW 10/03/2022 EXECUTIVE ENGINEER, RESOURCES DIVISION, P.H.E. DTE. 3,005.00 0.00 0 0
205 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED MOUGRAM (ZONE-I & II) PWSS TO ACCOMMODATE FHTC IN KETUGRAM-II BLOCK UNDER KATWA SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/10123 Augmentation Shifting of 63 KVA DTR at Naliapur village of Augmentation of Mougram Z-II water supply scheme under Burdwan Division, PHE Dte. (Ref ID-860268576, Application ID-100000077306, dt.-02/05/2023) BILL/00142/2023-2024 231/JJM/23-24 13/06/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LTD. 4.21 0.00 0 0
206 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED MOUGRAM (ZONE-I & II) PWSS TO ACCOMMODATE FHTC IN KETUGRAM-II BLOCK UNDER KATWA SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/10123 Augmentation Material Requisition To Resource Division RTOR000189/2021-2022 1383/BWD 09/03/2022 Resource Division 4.47 0.00 0 0
207 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED MOUGRAM (ZONE-I & II) PWSS TO ACCOMMODATE FHTC IN KETUGRAM-II BLOCK UNDER KATWA SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/10123 Augmentation Material Requisition To Resource Division RTOR000177/2021-2022 1335/BWD 08/03/2022 Resource Division 25.88 0.00 0 0
208 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED MOUGRAM (ZONE-I & II) PWSS TO ACCOMMODATE FHTC IN KETUGRAM-II BLOCK UNDER KATWA SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/10123 Augmentation Material Requisition To Resource Division RTOR000229/2021-2022 1551/BWD 15/03/2022 Resource Division 0.37 0.00 0 0
209 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED MOUGRAM (ZONE-I & II) PWSS TO ACCOMMODATE FHTC IN KETUGRAM-II BLOCK UNDER KATWA SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/10123 Augmentation Material Requisition To Resource Division RTOR000017/2022-2023 3280/BWD 29/07/2022 Resource Division 34.57 0.00 0 0
210 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED MOUGRAM (ZONE-I & II) PWSS TO ACCOMMODATE FHTC IN KETUGRAM-II BLOCK UNDER KATWA SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/10123 Augmentation Supply of 1 (one) No. Inspection Vehicle for different JJM Related Works as and when required including supply of driver and fuels (Minimum 8 Hours of duty) under Katwa Sub-Division within Burdwan Division, P.H.E. Dte. Consider 96.00 Km run per Day.(Sl No-1) ORD/000510/2023-2024 499/KTS 22/05/2023 70 M/S MUNMUN DEY 0.90 0.15 16.67 100
211 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED MOUGRAM (ZONE-I & II) PWSS TO ACCOMMODATE FHTC IN KETUGRAM-II BLOCK UNDER KATWA SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/10123 Augmentation Augmentation of MOUGRAM (ZONE-I) Piped Water Supply Scheme with LDS, FHTC, & Construction of 250 cum capacity OHR with 20.0 mtr. Staging height inclusive of soil investigation under Ketugram-II Block, District:- Purba-Burdwan. Assistant Engineer Junior Engineer, R.W.S., Katwa-I Dev. Block ORD/000087/2022-2023 2611/BWD 23/05/2022 365 UMWELT ENGINEER PVT LTD 499.84 295.99 59.22 97
212 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED MOUGRAM (ZONE-I & II) PWSS TO ACCOMMODATE FHTC IN KETUGRAM-II BLOCK UNDER KATWA SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/10123 Augmentation Continuation order for Supply of 1 (one) No. Inspection Vehicle for different JJM Related Works as and when required including supply of driver and fuels (Minimum 8 Hours of duty) under Katwa Sub-Division within Burdwan Division, P.H.E. Dte. Consider 96.00 Km run per Day. (Sl No-1) Assistant Engineer JUNIOR ENGINEER KATWA SUB-DIVISION PHE DTE ORD/000930/2023-2024 1016/KTS 20/09/2023 23 M/S MUNMUN DEY 0.30 0.00 0 0
213 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED MOUGRAM (ZONE-I & II) PWSS TO ACCOMMODATE FHTC IN KETUGRAM-II BLOCK UNDER KATWA SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/10123 Augmentation Augmentation of MOUGRAM (ZONE-II) Piped Water Supply Scheme with LDS, FHTC, & Construction of 300 cum capacity OHR with 20.0 mtr. Staging height inclusive of soil investigation under Ketugram-II Block, District:- Purba-Burdwan. Assistant Engineer Junior Engineer, R.W.S., Katwa-I Dev. Block ORD/000100/2022-2023 2782/BWD 14/06/2022 365 G.D. CONSTRUCTION & CO. 357.17 81.31 22.77 59
214 PURBA BARDHAMAN Burdwan Division Augmentation of Ground Water based Piped Water Supply Scheme for KOTACHANDIPUR to accommodate FHTC under Jal Sapno Mission under Ausgram-II Block in Purba Bardhaman District under Burdwan Division, P.H.E. DTE. , SM/09699 Augmentation Supply of materials for different water supply schemes under Burdwan Division, PHE Dte. VCH/001555/2021-2022 1194/DW 10/03/2022 EXECUTIVE ENGINEER, RESOURCES DIVISION, P.H.E. DTE. 62.76 0.00 0 0
215 PURBA BARDHAMAN Burdwan Division Augmentation of Ground Water based Piped Water Supply Scheme for KOTACHANDIPUR to accommodate FHTC under Jal Sapno Mission under Ausgram-II Block in Purba Bardhaman District under Burdwan Division, P.H.E. DTE. , SM/09699 Augmentation Supply of materials for different water supply scheme under Burdwan Division, PHE Dte. VCH/001578/2021-2022 1207/DW 10/03/2022 EXECUTIVE ENGINEER, RESOURCES DIVISION, P.H.E. DTE. 3,005.00 0.00 0 0
216 PURBA BARDHAMAN Burdwan Division Augmentation of Ground Water based Piped Water Supply Scheme for KOTACHANDIPUR to accommodate FHTC under Jal Sapno Mission under Ausgram-II Block in Purba Bardhaman District under Burdwan Division, P.H.E. DTE. , SM/09699 Augmentation Route Survey & Preparation of DPR for KOTA-CHANDIPUR PWSS under Ausgram-II under Durgapur (Bardhaman North) Sub-Division under Burdwan Division PHE Dte.[SL-A] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000645/2021-2022 99/DSD 18/02/2022 15 SIRCON ENGINEERING SERVICES 2.74 2.74 100 1
217 PURBA BARDHAMAN Burdwan Division Augmentation of Ground Water based Piped Water Supply Scheme for KOTACHANDIPUR to accommodate FHTC under Jal Sapno Mission under Ausgram-II Block in Purba Bardhaman District under Burdwan Division, P.H.E. DTE. , SM/09699 Augmentation Repairing and painting of 2 Nos existing Pump House for Kota Chnadipur Pipe Water Supply Scheme, Block- Ausgram-II, under Durgapur Sub-Division, P.H.E Dte. within Burdwan Division P.H.E. Dte. Dist:Purba Bardhaman. [Gr.-E] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000137/2022-2023 346/DSD 30/06/2022 45 SUNNY CONSTRUCTION 2.13 0.00 0 0
218 PURBA BARDHAMAN Burdwan Division Augmentation of Ground Water based Piped Water Supply Scheme for KOTACHANDIPUR to accommodate FHTC under Jal Sapno Mission under Ausgram-II Block in Purba Bardhaman District under Burdwan Division, P.H.E. DTE. , SM/09699 Augmentation Sinking of additional 250 X 150mm dia Tube Well 200 mtr. Depth by D.R. Rig method using UPVC pipe (CD) and UPVC Deep Well Screen (RDS) for KOTACHANDIPUR Piped Water Supply Scheme, Block - Ausgram - II, Dist - Purba Bardhaman under Burdwan Division, PHE Dte. Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000033/2022-2023 2202/BWD 28/04/2022 30 ANIRUDDHA FARUQUE 10.15 9.57 94.29 1
219 PURBA BARDHAMAN Burdwan Division Augmentation of Ground Water based Piped Water Supply Scheme for KOTACHANDIPUR to accommodate FHTC under Jal Sapno Mission under Ausgram-II Block in Purba Bardhaman District under Burdwan Division, P.H.E. DTE. , SM/09699 Augmentation Quotation for new connection charges for Augmentation of Kotachandipur w/s scheme under Burdwan Division, PHE Dte. T.W. No.-3 [Application No.-5003543454, dt.-05/12/2022, Ref. ID-503235377] BILL/00117/2022-2023 916/DW 30/12/2022 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LTD. 3.02 0.00 0 0
220 PURBA BARDHAMAN Burdwan Division Augmentation of Ground Water based Piped Water Supply Scheme for KOTACHANDIPUR to accommodate FHTC under Jal Sapno Mission under Ausgram-II Block in Purba Bardhaman District under Burdwan Division, P.H.E. DTE. , SM/09699 Augmentation Work Order for Augmentation of Kota-Chandipur Water Supply Scheme with LDS, Rising Main, FHTC work, Pump House & Boundary Wall of Ausgram ¿ II Block in Burdwan (North) Sub-Division, District ¿ Purba Bardhaman under Burdwan Division, PHE. Dte. Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000310/2021-2022 7088/BWD 22/12/2021 150 TIRUPATI ENTERPRISES 218.89 188.04 85.91 1
221 PURBA BARDHAMAN Burdwan Division Augmentation of Ground Water based Piped Water Supply Scheme for KOTACHANDIPUR to accommodate FHTC under Jal Sapno Mission under Ausgram-II Block in Purba Bardhaman District under Burdwan Division, P.H.E. DTE. , SM/09699 Augmentation Supply and delivery of different dia. CIDF sluice valve for Augmentation of Dignagar, Galsi, Barabelun & Kotachandipur Piped Water Supply Scheme within Durgapur (Burdwan North) Sub-Division under Burdwan Division, P.H.E. Dte. _2ND CALL Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000311/2022-2023 3624/BWD 22/08/2022 20 SSPR VALVE MANUFACTURING PVT LTD. 14.76 0.00 0 1
222 PURBA BARDHAMAN Central Mechanical Augmentation of Ground Water based Piped Water Supply Scheme for KOTACHANDIPUR to accommodate FHTC under Jal Sapno Mission under Ausgram-II Block in Purba Bardhaman District under Burdwan Division, P.H.E. DTE. , SM/09699 Augmentation Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Augmentation-1 of Kotachandipur Water Supply Scheme [ Block- Ausgram-I ] at Tube well No.-3 under CMD, PHE Dte., Dist.- Purba-Bardhaman ORD/000622/2022-2023 2100/CMD 08/09/2022 30 DELTA ENGINEERING ENTERPRISE 11.65 11.40 97.85 0
223 PURBA BARDHAMAN Burdwan Division Augmentation of Ground Water based Piped Water Supply Scheme for KOTACHANDIPUR to accommodate FHTC under Jal Sapno Mission under Ausgram-II Block in Purba Bardhaman District under Burdwan Division, P.H.E. DTE. , SM/09699 Augmentation Restoration of village Road dismantled by laying pipeline for providing FHTC at Kota Ankure para, Bauripara & Loharpara under Augmentation of KOTA-CHANDIPUR Piped Water Supply Scheme under Ausgram-II Block within Durgapur (Burdwan North) Sub Division under Burdwan Division, P.H.E. Dte. [SL-07] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer1, Durgapur Sub-Division, PHE Dte. ORD/000058/2023-2024 181/DSD 18/04/2023 21 PARTHA RAY 0.96 0.95 98.96 100
224 PURBA BARDHAMAN Burdwan Division Augmentation of Ground Water based Piped Water Supply Scheme for KOTACHANDIPUR to accommodate FHTC under Jal Sapno Mission under Ausgram-II Block in Purba Bardhaman District under Burdwan Division, P.H.E. DTE. , SM/09699 Augmentation Construction of drain at new 3rd Tube well site of Augmentation of Kota Chandipur water supply scheme, Block-Ausgram-II within Durgapur (Bardhaman North) Sub-Division, under Burdwan Division, Phe Dte.[SL-03] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer1, Durgapur Sub-Division, PHE Dte. ORD/000041/2023-2024 169/DSD 18/04/2023 21 PARTHA RAY 0.96 0.93 96.88 100
225 PURBA BARDHAMAN Burdwan Division Augmentation of Ground Water based Piped Water Supply Scheme for KOTACHANDIPUR to accommodate FHTC under Jal Sapno Mission under Ausgram-II Block in Purba Bardhaman District under Burdwan Division, P.H.E. DTE. , SM/09699 Augmentation Construction of pathway at new 3rd Tube well site of Augmentation of Kota Chandipur water supply scheme, Block-Ausgram-II within Durgapur (Bardhaman North) Sub-Division, under Burdwan Division, Phe. Dte.[SL-05] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer1, Durgapur Sub-Division, PHE Dte. ORD/000043/2023-2024 171/DSD 18/04/2023 21 M/S MUKHERJEE CONSTRUCTION 0.96 0.95 98.96 100
226 PURBA BARDHAMAN Burdwan Division Augmentation of Ground Water based Piped Water Supply Scheme for KOTACHANDIPUR to accommodate FHTC under Jal Sapno Mission under Ausgram-II Block in Purba Bardhaman District under Burdwan Division, P.H.E. DTE. , SM/09699 Augmentation Ground development at new 3rd Tube well site of Augmentation of Kota Chandipur water supply scheme, Block-Ausgram-II within Durgapur (Bardhaman North) Sub-Division, under Burdwan Division, Phe. Dte.[SL-04] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer1, Durgapur Sub-Division, PHE Dte. ORD/000042/2023-2024 170/DSD 18/04/2023 21 M/S MUKHERJEE CONSTRUCTION 0.91 0.91 100 100
227 PURBA BARDHAMAN Burdwan Division Augmentation of Ground Water based Piped Water Supply Scheme for KOTACHANDIPUR to accommodate FHTC under Jal Sapno Mission under Ausgram-II Block in Purba Bardhaman District under Burdwan Division, P.H.E. DTE. , SM/09699 Augmentation Retrofitting of RCC elevated reservoir (Capacity-200 cum) by shotcreting, guinting etc. connection with Augmentation of Kota-Chandipur water supply scheme within Durgapur (Bardhaman North) Sub-Division, PHE Dte, Block-Ausgram-II under Burdwan Division, PHE Dte. [SL-22] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer1, Durgapur Sub-Division, PHE Dte. ORD/000872/2022-2023 721/DSD 30/12/2022 30 P. ENTERPRISE 2.98 2.95 98.99 100
228 PURBA BARDHAMAN Burdwan Division Augmentation of Ground Water based Piped Water Supply Scheme for KOTACHANDIPUR to accommodate FHTC under Jal Sapno Mission under Ausgram-II Block in Purba Bardhaman District under Burdwan Division, P.H.E. DTE. , SM/09699 Augmentation Colour washing, lettering, earthling and other allied works of RCC elevated reservoir (Capacity-200 cum) in connection with Augmentation of Kota-Chandipur water supply scheme within Durgapur (Bardhaman North) Sub-Division, PHE Dte, Block-Ausgram-II under Burdwan Division, PHE Dte. [SL-21] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer1, Durgapur Sub-Division, PHE Dte. ORD/000865/2022-2023 720/DSD 30/12/2022 30 TIRUPATI ENTERPRISES 1.85 1.83 98.92 100
229 PURBA BARDHAMAN Burdwan Division Augmentation of Ground Water based Piped Water Supply Scheme for KOTACHANDIPUR to accommodate FHTC under Jal Sapno Mission under Ausgram-II Block in Purba Bardhaman District under Burdwan Division, P.H.E. DTE. , SM/09699 Augmentation Material Requisition To Resource Division RTOR000017/2021-2022 7347/BWD 30/12/2021 Resource Division 6.59 0.00 0 0
230 PURBA BARDHAMAN Burdwan Division Augmentation of Ground Water based Piped Water Supply Scheme for KOTACHANDIPUR to accommodate FHTC under Jal Sapno Mission under Ausgram-II Block in Purba Bardhaman District under Burdwan Division, P.H.E. DTE. , SM/09699 Augmentation Material Requisition To Resource Division RTOR000025/2021-2022 558/BWD 27/01/2022 Resource Division 6.51 0.00 0 0
231 PURBA BARDHAMAN Burdwan Division Augmentation of Ground Water based Piped Water Supply Scheme for KOTACHANDIPUR to accommodate FHTC under Jal Sapno Mission under Ausgram-II Block in Purba Bardhaman District under Burdwan Division, P.H.E. DTE. , SM/09699 Augmentation Material Requisition To Resource Division RTOR000099/2021-2022 771/BWD 07/02/2022 Resource Division 18.27 0.00 0 0
232 PURBA BARDHAMAN Burdwan Division Augmentation of Ground Water based Piped Water Supply Scheme for KOTACHANDIPUR to accommodate FHTC under Jal Sapno Mission under Ausgram-II Block in Purba Bardhaman District under Burdwan Division, P.H.E. DTE. , SM/09699 Augmentation Material Requisition To Resource Division RTOR000188/2021-2022 1384/BWD 09/03/2022 Resource Division 3.83 0.00 0 0
233 PURBA BARDHAMAN Burdwan Division Augmentation of Ground Water based Piped Water Supply Scheme for KOTACHANDIPUR to accommodate FHTC under Jal Sapno Mission under Ausgram-II Block in Purba Bardhaman District under Burdwan Division, P.H.E. DTE. , SM/09699 Augmentation Material Requisition To Resource Division RTOR000237/2021-2022 1561/BWD 15/03/2022 Resource Division 0.37 0.00 0 0
234 PURBA BARDHAMAN Burdwan Division Augmentation of Ground Water based Piped Water Supply Scheme for KOTACHANDIPUR to accommodate FHTC under Jal Sapno Mission under Ausgram-II Block in Purba Bardhaman District under Burdwan Division, P.H.E. DTE. , SM/09699 Augmentation Material Requisition To Resource Division RTOR000169/2021-2022 1329/BWD 08/03/2022 Resource Division 18.37 0.00 0 0
235 PURBA BARDHAMAN Burdwan Division Augmentation of Ground Water based Piped Water Supply Scheme for KOTACHANDIPUR to accommodate FHTC under Jal Sapno Mission under Ausgram-II Block in Purba Bardhaman District under Burdwan Division, P.H.E. DTE. , SM/09699 Augmentation Providing Functional Household Tap Connection (FHTC) from existing distribution system with within the command area of Augmentation of KOTA-CHANDIPUR Piped Water Supply Scheme [Retrofitting] at Kota (Part), village, habitation, Ausgram-II Block within Durgapur (Burdwan North) Sub Division under Burdwan Division, P.H.E. Dte. ORD/000878/2023-2024 5358/BWD 06/12/2023 30 DEBJYOTI GOSWAMI 9.29 0.00 0 100
236 PURBA BARDHAMAN Durgapur W/S Division Augmentation of Ground Water based Piped Water Supply Scheme for KOTACHANDIPUR to accommodate FHTC under Jal Sapno Mission under Ausgram-II Block in Purba Bardhaman District under Burdwan Division, P.H.E. DTE. , SM/09699 Augmentation Material Requisition To Resource Division RTOR000047/2024-2025 467/DWSD 17/03/2025 Resource Division 0.21 0.00 0 0
237 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) under the command area of Bhatkunda Piped Water Supply Scheme , SM/07547 Retrofitting Extension of UPVC pipeline of laying distribution system at Moukata village at Bhatkunda and its adjoining mouzas water supply scheme within Ausgram-II Block under Durgapur Sub-Division under Burdwan Division, PHE Dte. [Gr.-D] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000835/2020-2021 171/DSD 19/02/2021 21 SHUBHRA KANTI GHOSH 4.62 0.00 0 1
238 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) under the command area of Bhatkunda Piped Water Supply Scheme , SM/07547 Retrofitting Land development and Construction of culvert and approach road at 2nd tubewell site of Bhatkunda Water Supply Scheme within Durgapur Sub Division Under Burdwan Division, PHE Dte.[SL-F] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000119/2022-2023 337/DSD 27/06/2022 30 RAM MOHAN MUKHERJEE 3.33 0.00 0 1
239 PURBA BARDHAMAN Burdwan Division Augmentation of SATGACHI PWSS for providing Functional Household Tap Connection (FHTC) Block- Kalna-II Purba Burdwan West Bengal , SM/09921 Augmentation Supply of materials for different water supply scheme under Burdwan Division, PHE Dte. VCH/001578/2021-2022 1207/DW 10/03/2022 EXECUTIVE ENGINEER, RESOURCES DIVISION, P.H.E. DTE. 3,005.00 0.00 0 0
240 PURBA BARDHAMAN Burdwan Division Augmentation of SATGACHI PWSS for providing Functional Household Tap Connection (FHTC) Block- Kalna-II Purba Burdwan West Bengal , SM/09921 Augmentation Preparation of DPR for augmentation of Satgachhi W/S Scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. (Sl No-B) Assistant Engineer ORD/000514/2021-2022 182/KSD 21/02/2022 21 M/S R. DUTTA & CO. 3.27 3.22 98.47 1
241 PURBA BARDHAMAN Burdwan Division Augmentation of SATGACHI PWSS for providing Functional Household Tap Connection (FHTC) Block- Kalna-II Purba Burdwan West Bengal , SM/09921 Augmentation Extension of 75 mm dia pipeline at Miya Para, Modhya Bohar & Bhagar Para Purba Bohar regarding FHTC under Satgachia (Zone-I) water supply scheme under Burdwan Division, PHE Dte.[Gr.-A] Assistant Engineer ,Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000350/2021-2022 703/BSD 11/06/2021 5 M/S SAYAN CHAKRABORTY 0.88 0.00 0 1
242 PURBA BARDHAMAN Central Mechanical Augmentation of SATGACHI PWSS for providing Functional Household Tap Connection (FHTC) Block- Kalna-II Purba Burdwan West Bengal , SM/09921 Augmentation New service connection charges for Aug. of Satgachi PWSS TW-3 BILL/01393/2023-2024 BP-2023-24-136 25/08/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 6.05 0.00 0 0
243 PURBA BARDHAMAN Central Mechanical Augmentation of SATGACHI PWSS for providing Functional Household Tap Connection (FHTC) Block- Kalna-II Purba Burdwan West Bengal , SM/09921 Augmentation New service connection charges for Aug. of Satgachi PWSS TW-4 BILL/01395/2023-2024 BP-2023-24-137 25/08/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.67 0.00 0 0
244 PURBA BARDHAMAN Burdwan Division Augmentation of SATGACHI PWSS for providing Functional Household Tap Connection (FHTC) Block- Kalna-II Purba Burdwan West Bengal , SM/09921 Augmentation Material Requisition To Resource Division RTOR000173/2021-2022 1331/BWD 08/03/2022 Resource Division 160.86 0.00 0 0
245 PURBA BARDHAMAN Burdwan Division Augmentation of SATGACHI PWSS for providing Functional Household Tap Connection (FHTC) Block- Kalna-II Purba Burdwan West Bengal , SM/09921 Augmentation Material Requisition To Resource Division RTOR000038/2021-2022 551/BWD 27/01/2022 Resource Division 39.34 0.00 0 0
246 PURBA BARDHAMAN Burdwan Division Augmentation of SATGACHI PWSS for providing Functional Household Tap Connection (FHTC) Block- Kalna-II Purba Burdwan West Bengal , SM/09921 Augmentation Material Requisition To Resource Division RTOR000222/2021-2022 1545/BWD 15/03/2022 Resource Division 0.37 0.00 0 0
247 PURBA BARDHAMAN Burdwan Division Augmentation of SATGACHI PWSS for providing Functional Household Tap Connection (FHTC) Block- Kalna-II Purba Burdwan West Bengal , SM/09921 Augmentation Material Requisition To Resource Division RTOR000194/2021-2022 1388/BWD 09/03/2022 Resource Division 4.60 0.00 0 0
248 PURBA BARDHAMAN Burdwan Division Augmentation of SATGACHI PWSS for providing Functional Household Tap Connection (FHTC) Block- Kalna-II Purba Burdwan West Bengal , SM/09921 Augmentation Material Requisition To Resource Division RTOR000014/2022-2023 3273/BWD 29/07/2022 Resource Division 33.26 0.00 0 0
249 PURBA BARDHAMAN Burdwan Division Augmentation of SATGACHI PWSS for providing Functional Household Tap Connection (FHTC) Block- Kalna-II Purba Burdwan West Bengal , SM/09921 Augmentation Material Requisition To Resource Division RTOR000038/2022-2023 4630/BWD 17/10/2022 Resource Division 12.32 0.00 0 0
250 PURBA BARDHAMAN Central Mechanical Augmentation of SATGACHI PWSS for providing Functional Household Tap Connection (FHTC) Block- Kalna-II Purba Burdwan West Bengal , SM/09921 Augmentation Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination system and internal House wiring for Tube well no.- 1 & 2 at Augumentation of Satgachi Water Supply Scheme under CMD, PHE Dte., Dist.- Purba-Bardhaman. [2nd CALL] ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000210/2023-2024 3046/CMD 20/07/2023 30 AMUSAR IMPEX PVT. LTD. 21.98 10.61 48.27 95
251 PURBA BARDHAMAN Burdwan Division Augmentation of SATGACHI PWSS for providing Functional Household Tap Connection (FHTC) Block- Kalna-II Purba Burdwan West Bengal , SM/09921 Augmentation Sinking of additional 250 X 150mm dia Tube Well 150 mtr. Depth by D.R. Rig method using UPVC pipe (CD) and UPVC Deep Well Screen (RDS) for SATGACHHI Piped Water Supply Scheme, Block - Kalna - II, Dist - Purba Bardhaman under Burdwan Division, PHE Dte. Assistant Engineer ORD/000069/2022-2023 2423/BWD 11/05/2022 30 M/S SYCHROTECH INDUSTRY 9.01 0.00 0 100
252 PURBA BARDHAMAN Burdwan Division Augmentation of SATGACHI PWSS for providing Functional Household Tap Connection (FHTC) Block- Kalna-II Purba Burdwan West Bengal , SM/09921 Augmentation Digital structurization of pipeline alignment and asset evaluation including holistic design, preparation of design drawings of overall LDS & preparation of estimate for 03 Nos. Piped W/S. Schemes under Kalna II Block under Kalna Sub-Division under Burdwan Division, PHE. Dte. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000336/2024-2025 3016/BWD 05/08/2024 20 HORIZEN 7.55 0.00 0 100
253 PURBA BARDHAMAN Central Mechanical Augmentation of SATGACHI PWSS for providing Functional Household Tap Connection (FHTC) Block- Kalna-II Purba Burdwan West Bengal , SM/09921 Augmentation Quotation for new service connection at Satgachi PWSS PH 5 BILL/00933/2024-2025 BP-2024-25-351 05/10/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.59 0.00 0 0
254 PURBA BARDHAMAN Burdwan Division Augmentation of SATGACHI PWSS for providing Functional Household Tap Connection (FHTC) Block- Kalna-II Purba Burdwan West Bengal , SM/09921 Augmentation Quotation payment for electricity at Satgachi Pwss Tw-06 BILL/01296/2024-2025 1511/JJM 17/03/2025 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 9.97 0.00 0 null
255 PURBA BARDHAMAN Burdwan Division Augmentation of SATGACHI PWSS for providing Functional Household Tap Connection (FHTC) Block- Kalna-II Purba Burdwan West Bengal , SM/09921 Augmentation Quotation payment for electricity at Satgachi Tw-08 BILL/01295/2024-2025 1512/JJM 17/03/2025 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 4.29 0.00 0 null
256 PURBA BARDHAMAN Burdwan Division Augmentation of SATGACHI PWSS for providing Functional Household Tap Connection (FHTC) Block- Kalna-II Purba Burdwan West Bengal , SM/09921 Augmentation Quotation Payment for electricity at Satgachi Pwss Tw-07 BILL/01301/2024-2025 1510/JJM 17/03/2025 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 5.17 0.00 0 null
257 PURBA BARDHAMAN Burdwan Division Augmentation of SATGACHI PWSS for providing Functional Household Tap Connection (FHTC) Block- Kalna-II Purba Burdwan West Bengal , SM/09921 Augmentation Supply of various D.I. Mechanical joints & specials for Aug. of SATGACHI & Aug. of BAIDYAPUR Piped W/S. Scheme within Kalna Sub-Division under Burdwan Division, PHE. Dte. [Part-B]. AE(HQs) JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000304/2024-2025 2827/BWD 19/07/2024 216 KEJRIWAL CASTINGS LIMITED 4.82 0.00 0 100
258 PURBA BARDHAMAN Burdwan Division Augmentation of SATGACHI PWSS for providing Functional Household Tap Connection (FHTC) Block- Kalna-II Purba Burdwan West Bengal , SM/09921 Augmentation Augmentation of SATGACHI Piped Water Supply Scheme with LDS, FHTC, Rising main, Construction of 700 cum capacity OHR with 20.0 mtr. Staging height inclusive of soil investigation including construction of switch-room (3.60mx3.0m) & boundary wall under Kalna-II Block, District:- Purba-Burdwan. Assistant Engineer JUNIOR ENGINEER R.W.S. BURDWAN SUB-DIVISION PHE DTE ORD/000065/2022-2023 2339/BWD 10/05/2022 1056 P.B. ENTERPRISE 727.47 395.59 54.38 30
259 PURBA BARDHAMAN Burdwan Division Augmentation of SATGACHI PWSS for providing Functional Household Tap Connection (FHTC) Block- Kalna-II Purba Burdwan West Bengal , SM/09921 Augmentation Supply of various D.I. Mechanical joints & specials for Aug. of SATGACHI & Aug. of BAIDYAPUR Piped W/S. Scheme within Kalna Sub-Division under Burdwan Division, PHE. Dte. [Part-A]. AE(HQs) JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000315/2024-2025 2839/BWD 19/07/2024 215 ELECTROSTEEL CASTING LIMITED 4.95 0.00 0 100
260 PURBA BARDHAMAN Burdwan Division Augmentation of SATGACHI PWSS for providing Functional Household Tap Connection (FHTC) Block- Kalna-II Purba Burdwan West Bengal , SM/09921 Augmentation Supply of various D.I. Mechanical joints & specials for Aug. of SATGACHI & Aug. of BAIDYAPUR Piped W/S. Scheme within Kalna Sub-Division under Burdwan Division, PHE. Dte. [Part-C]. AE(HQs) JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000308/2024-2025 2831/BWD 19/07/2024 225 JINDAL SAW LTD. 4.63 0.00 0 100
261 PURBA BARDHAMAN Burdwan Division PROVIDING FUNCTIONAL HOUSEHOLD TAP CONNECTION (FHTC) BY RETROFITTING (PHASE III) AT KALYANBATI, NARAYANPUR,RADHKRISHNAPUR & SUDPUR MOUZAS WITHIN THE COMMAND AREA OF SUDPUR PIPED WATER SUPPLY SCHEME AND AT KATWA-I BLOCK UNDER KATWA SUB DIVISION WITHIN BUR , SM/12081 Retrofitting Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of SUDPUR Piped Water Supply Scheme (PART-A) at Katwa-I Block under Burdwan Division, PHE Dte. [Agreement No. 44/2020-2021 OF SE/CC/PHE. DTE.] Assistant Engineer ORD/000058/2020-2021 4290/BWD 03/11/2020 90 MD HASIN 86.85 15.21 17.51 1
262 PURBA BARDHAMAN Burdwan Division PROVIDING FUNCTIONAL HOUSEHOLD TAP CONNECTION (FHTC) BY RETROFITTING (PHASE III) AT KALYANBATI, NARAYANPUR,RADHKRISHNAPUR & SUDPUR MOUZAS WITHIN THE COMMAND AREA OF SUDPUR PIPED WATER SUPPLY SCHEME AND AT KATWA-I BLOCK UNDER KATWA SUB DIVISION WITHIN BUR , SM/12081 Retrofitting Supply, delivery & installation of submersible pumping machinery, voltage stabiliser, chlorinator and internal house wiring for Tube well No.-3 of Sudpur water supply scheme under CMD PHE Dte. VCH/000758/2022-2023 788/DW/22-23 23/11/2022 M.S. ENTERPRISE 9.43 0.00 0 0
263 PURBA BARDHAMAN Burdwan Division PROVIDING FUNCTIONAL HOUSEHOLD TAP CONNECTION (FHTC) BY RETROFITTING (PHASE III) AT KALYANBATI, NARAYANPUR,RADHKRISHNAPUR & SUDPUR MOUZAS WITHIN THE COMMAND AREA OF SUDPUR PIPED WATER SUPPLY SCHEME AND AT KATWA-I BLOCK UNDER KATWA SUB DIVISION WITHIN BUR , SM/12081 Retrofitting Laying of pipe line parallel to the main line of the existing Distribution System including providing FHTC at Kalyanbati, Narayanpur, Bijoynagar, Purba Bijnagar & Ramkrishnapur village (Mouza) within scheme jurisdiction of SUDPUR Piped W/S. Scheme under Burdwan Division PHE Dte. Assistant Engineer JUNIOR ENGINEER KATWA SUB-DIVISION PHE DTE ORD/000279/2021-2022 6972/BWD 15/12/2021 60 MD HASIN 63.40 13.33 21.03 1
264 PURBA BARDHAMAN Burdwan Division PROVIDING FUNCTIONAL HOUSEHOLD TAP CONNECTION (FHTC) BY RETROFITTING (PHASE III) AT KALYANBATI, NARAYANPUR,RADHKRISHNAPUR & SUDPUR MOUZAS WITHIN THE COMMAND AREA OF SUDPUR PIPED WATER SUPPLY SCHEME AND AT KATWA-I BLOCK UNDER KATWA SUB DIVISION WITHIN BUR , SM/12081 Retrofitting Construction of valve Chamber and supply of sluice valve at Sudpur PWSS under Katwa-I Block under Katwa Sub-Division under Burdwan Division, PHE Dte.[Sl No-4] Assistant Engineer JUNIOR ENGINEER KATWA SUB-DIVISION PHE DTE ORD/000372/2023-2024 671/KTS 22/06/2023 30 HAMID SK 0.93 0.00 0 100
265 PURBA BARDHAMAN Burdwan Division PROVIDING FUNCTIONAL HOUSEHOLD TAP CONNECTION (FHTC) BY RETROFITTING (PHASE III) AT KALYANBATI, NARAYANPUR,RADHKRISHNAPUR & SUDPUR MOUZAS WITHIN THE COMMAND AREA OF SUDPUR PIPED WATER SUPPLY SCHEME AND AT KATWA-I BLOCK UNDER KATWA SUB DIVISION WITHIN BUR , SM/12081 Retrofitting Balance work of OHR at Head Work site, construction of HUME Pipe culvert , Road restoration work and boundary wall at 2nd TW site with Gate, land development at Head work site and 2nd TW site under KAITHAN, SUDPUR & PANUHAT Piped Water Supply Scheme under KATWA -I Block, under Katwa Sub-Division within Burdwan Division, PHE Dte. Assistant Engineer JUNIOR ENGINEER KATWA SUB-DIVISION PHE DTE ORD/000486/2024-2025 3141/BWD 20/08/2024 120 VISHAL CONSTRUCTION CO. 126.29 0.00 0 50
266 PURBA BARDHAMAN Memari - II Burdwan Division KUCHUT PIPED WATER SUPPLY SCHEME , SM/13464 New Material Requisition To Resource Division RTOR000072/2022-2023 1269/BWD 17/03/2023 Resource Division 14.20 0.00 0 0
267 PURBA BARDHAMAN Memari - II Central Mechanical KUCHUT PIPED WATER SUPPLY SCHEME , SM/13464 New New service connection charges for Kuchut PWSS TW-1 BILL/00778/2023-2024 BP-2023-24-77 24/07/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.87 0.00 0 0
268 PURBA BARDHAMAN Memari - II Central Mechanical KUCHUT PIPED WATER SUPPLY SCHEME , SM/13464 New New service connection charges for Kuchut PWSS TW-2 BILL/00779/2023-2024 BP-2023-24-78 24/07/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 2.83 0.00 0 0
269 PURBA BARDHAMAN Memari - II Burdwan Division KUCHUT PIPED WATER SUPPLY SCHEME , SM/13464 New Material Requisition To Resource Division RTOR000466/2023-2024 3990/BWD 08/09/2023 Resource Division 1.70 0.00 0 0
270 PURBA BARDHAMAN Memari - II Burdwan Division KUCHUT PIPED WATER SUPPLY SCHEME , SM/13464 New Material Requisition To Resource Division RTOR000674/2023-2024 5051/BWD 23/11/2023 Resource Division 20.46 0.00 0 0
271 PURBA BARDHAMAN Memari - II Burdwan Division KUCHUT PIPED WATER SUPPLY SCHEME , SM/13464 New Supply of Inspection Vehicle for inspection of different JJM related (Schemes) works as and when required including supply of driver & fuel (minimum 8 Hours duty per day) and all taxes etc. for Burdwan Sub-Division under Burdwan Division, P.H.E. Dte. consider 96.00 Km. run per day.[Period from 01/08/2023 to 31/10/2023] ORD/000845/2023-2024 1759/BSD 28/07/2023 66 MD HASIN 0.85 0.00 0 0
272 PURBA BARDHAMAN Memari - II Burdwan Division KUCHUT PIPED WATER SUPPLY SCHEME , SM/13464 New Supply & delivery of different dia. MJ Coller for FHTC as well as smooth running of different W/S. Schemes under Burdwan Division, P.H.E. Dte. [i.e. (1) Magra PWSS, Memari-I Block, (2) Kuchut PWSS, Memari - II Block, (3) Khundkuri PWSS, Khandaghosh Block & (4) Samanti PWSS, Burdwan - II Block)] ORD/000653/2023-2024 4076/BWD 13/09/2023 20 SSPR VALVE MANUFACTURING PVT LTD. 20.63 0.00 0 100
273 PURBA BARDHAMAN Memari - II Central Mechanical KUCHUT PIPED WATER SUPPLY SCHEME , SM/13464 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at Kuchut Water Supply Scheme [ Block- Memari-2 ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER Junior Engineer ORD/000050/2023-2024 2512/CMD 02/06/2023 30 CHOUDHURY ENTERPRISE 29.40 22.24 75.65 50
274 PURBA BARDHAMAN Memari - II Burdwan Division KUCHUT PIPED WATER SUPPLY SCHEME , SM/13464 New Supply of one no. Diesel / LPG / CNG driven Motor Cab / Maxi Cab (Air Condition) on hire basis for the office of the Superintending Engineer, Central Circle, P.H.E. Dte. [Period from 01.02.2024 to 31.03.2024] AE(HQs) J.E. 1 BURDWAN ORD/001203/2023-2024 41/AE/HQ 29/01/2024 60 SOURAV JANA 0.80 0.00 0 50
275 PURBA BARDHAMAN Memari - II Burdwan Division KUCHUT PIPED WATER SUPPLY SCHEME , SM/13464 New Continuation work for Supply of one no. Diesel / LPG / CNG driven Motor Cab / Maxi Cab (Air Condition) on hire basis for the office of the Superintending Engineer, Central Circle, P.H.E. Dte. [Period from 01.04.2024 to 31.05.2024] AE(HQs) J.E. 1 BURDWAN ORD/001229/2023-2024 232/AE/HQ 28/03/2024 60 SOURAV JANA 0.80 0.00 0 0
276 PURBA BARDHAMAN Memari - II Central Mechanical KUCHUT PIPED WATER SUPPLY SCHEME , SM/13464 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at NOAHATI & others water supply scheme under Memari-II Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. ASSISTANT ENGINEER Junior Engineer ORD/000102/2024-2025 2395/CMD 02/08/2024 90 S.G. TECHNICAL SERVICES 36.99 0.00 0 0
277 PURBA BARDHAMAN Memari - II Burdwan Division KUCHUT PIPED WATER SUPPLY SCHEME , SM/13464 New Continuation work for Supply of one no. Diesel / LPG / CNG driven Motor Cab / Maxi Cab (Air Condition) on hire basis for the office of the Superintending Engineer, Central Circle, P.H.E. Dte. [Period from 01.06.2024 to 31.07.2024] AE(HQs) J.E. 1 BURDWAN ORD/000440/2024-2025 305/AE/HQ 31/05/2024 60 SOURAV JANA 0.80 0.00 0 0
278 PURBA BARDHAMAN Memari - II Burdwan Division KUCHUT PIPED WATER SUPPLY SCHEME , SM/13464 New Continuation work for Supply of one no. Diesel / LPG / CNG driven Motor Cab / Maxi Cab (Air Condition) on hire basis for the office of the Superintending Engineer, Central Circle, P.H.E. Dte. [Period from 01.08.2024 to 30.09.2024] AE(HQs) Contractual Junior Engineer ORD/000505/2024-2025 546/AE/HQ 01/08/2024 60 SOURAV JANA 0.80 0.80 100 0
279 PURBA BARDHAMAN Memari - II Burdwan Division KUCHUT PIPED WATER SUPPLY SCHEME , SM/13464 New Continuation work for Supply of one no. Diesel / LPG / CNG driven Motor Cab / Maxi Cab (Air Condition) on hire basis for the office of the Superintending Engineer, Central Circle, P.H.E. Dte. [Period from 01.10.2024 to 30.11.2024] AE(HQs) Contractual Junior Engineer ORD/000706/2024-2025 822/AE/HQ 01/10/2024 60 SOURAV JANA 0.80 0.76 95 0
280 PURBA BARDHAMAN Memari - II Burdwan Division KUCHUT PIPED WATER SUPPLY SCHEME , SM/13464 New Continuation work for Supply of one no. Diesel / LPG / CNG driven Motor Cab / Maxi Cab (Air Condition) on hire basis for the office of the Superintending Engineer, Central Circle, P.H.E. Dte. [Period from 01.12.2024 to 31.01.2025] Contractual Junior Engineer ORD/000898/2024-2025 1011/AE/HQ 29/11/2024 60 SOURAV JANA 0.80 0.00 0 0
281 PURBA BARDHAMAN Memari - II Burdwan Division KUCHUT PIPED WATER SUPPLY SCHEME , SM/13464 New Different works related (sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of different capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site) to KUCHUT & NOAHATI Piped Water Supply Scheme under Memari - II Block, District:- Purba Bardhaman [NEW SCHEME] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000750/2022-2023 1172/BWD 14/03/2023 659 NATIONAL CONSTRUCTION 831.75 265.44 31.91 99
282 PURBA BARDHAMAN Memari - II Central Mechanical KUCHUT PIPED WATER SUPPLY SCHEME , SM/13464 New Supply and installation of Electro-Magnetic flow meter at HARIGRAM, KUCHUT & others water supply scheme under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. ASSISTANT ENGINEER Junior Engineer ORD/000564/2024-2025 3103/CMD 11/12/2024 60 S DUTTA 15.06 0.00 0 0
283 PURBA BARDHAMAN Memari - II Burdwan Division KUCHUT PIPED WATER SUPPLY SCHEME , SM/13464 New Repairing damaged Pipeline & concrete road by Cement concrete (mix 1:1.5:3) and drainage system, Sluice valve chamber for FHTC work for SATGACHIA ZONE-I, SATGACHIA ZONE-II, SRIDHARPUR, PARHATI, KUCHUT, NOAHATI, MONDALGRAM PWSS and its adjoining mouzas within MEMARI-II BLOCK under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000283/2024-2025 2715/BWD 11/07/2024 205 A.R. TRADERS 74.28 0.00 0 30
284 PURBA BARDHAMAN Memari - II Burdwan Division KUCHUT PIPED WATER SUPPLY SCHEME , SM/13464 New Continuation work for Supply of one no. Diesel / LPG / CNG driven Motor Cab / Maxi Cab (Air Condition) on hire basis for the office of the Superintending Engineer, Central Circle, P.H.E. Dte. [Period from 01.02.2025 to 31.03.2025] Contractual Junior Engineer ORD/001156/2024-2025 184/AE/HQ 31/01/2025 60 SOURAV JANA 0.80 0.00 0 0
285 PURBA BARDHAMAN Memari - II Burdwan Division KUCHUT PIPED WATER SUPPLY SCHEME , SM/13464 New Different Types of work involved in connection with different New Schemes (05 Nos.) Piped Water Supply Scheme under Memari II Block within Burdwan Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000003/2025-2026 1116/BWD 03/04/2025 120 SOFIQUL ISLAM 176.89 0.00 0 0
286 PURBA BARDHAMAN Memari - II Burdwan Division KUCHUT PIPED WATER SUPPLY SCHEME , SM/13464 New Continuation work for Supply of one no. Diesel / LPG / CNG driven Motor Cab / Maxi Cab (Air Condition) on hire basis for the office of the Superintending Engineer, Central Circle, P.H.E. Dte. [Period from 01.04.2025 to 31.05.2025] Contractual Junior Engineer ORD/001403/2024-2025 454/AE/HQ 28/03/2025 60 SOURAV JANA 0.80 0.00 0 0
287 PURBA BARDHAMAN Purbasthali - I Burdwan Division RAJAPUR PIPED WATER SUPPLY SCHEME , SM/14021 New Material Requisition To Resource Division RTOR000086/2022-2023 1241/BWD 17/03/2023 Resource Division 3.55 0.00 0 0
288 PURBA BARDHAMAN Purbasthali - I Central Mechanical RAJAPUR PIPED WATER SUPPLY SCHEME , SM/14021 New New service connection charges for Rajapur PWSS TW-2 BILL/01091/2023-2024 BP-2023-24-121 17/08/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 8.51 0.00 0 0
289 PURBA BARDHAMAN Purbasthali - I Central Mechanical RAJAPUR PIPED WATER SUPPLY SCHEME , SM/14021 New New service connection charges for Rajapur PWSS TW-1 BILL/01090/2023-2024 BP-2023-24-120 17/08/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 8.97 0.00 0 0
290 PURBA BARDHAMAN Purbasthali - I Burdwan Division RAJAPUR PIPED WATER SUPPLY SCHEME , SM/14021 New Material Requisition To Resource Division RTOR000477/2023-2024 4001/BWD 08/09/2023 Resource Division 1.09 0.00 0 0
291 PURBA BARDHAMAN Purbasthali - I Central Mechanical RAJAPUR PIPED WATER SUPPLY SCHEME , SM/14021 New Damage restoration charges in connection with WBSEDCL electrification under Rajapur PWSS BILL/01477/2023-2024 BP-2023-24-176 29/09/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 0.10 0.00 0 0
292 PURBA BARDHAMAN Purbasthali - I Central Mechanical RAJAPUR PIPED WATER SUPPLY SCHEME , SM/14021 New Addl. New service connection charges for Rajapur PWSS TW-1 BILL/01730/2023-2024 BP-2023-24-245 07/12/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 0.76 0.00 0 0
293 PURBA BARDHAMAN Purbasthali - I Burdwan Division RAJAPUR PIPED WATER SUPPLY SCHEME , SM/14021 New Material Requisition To Resource Division RTOR000807/2023-2024 298/BWD 24/01/2024 Resource Division 8.86 0.00 0 0
294 PURBA BARDHAMAN Purbasthali - I Central Mechanical RAJAPUR PIPED WATER SUPPLY SCHEME , SM/14021 New Supply & Installation of Submersible Pumping Machinery , Voltage Stabilizer, Chlorination system and internal House wiring for Tube well no.- 1 & 2 at RAJAPUR Water Supply Scheme [Block - PURBASTHALI-1] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000053/2023-2024 2516/CMD 02/06/2023 30 M/S GHOSH ENTERPRISE 20.80 6.31 30.34 90
295 PURBA BARDHAMAN Purbasthali - I Burdwan Division RAJAPUR PIPED WATER SUPPLY SCHEME , SM/14021 New RAJAPUR Piped Water Supply Scheme with sinking of Tube-well, LDS, Rising Main, FHTC, construction of switch rooms & boundary walls with gates and land development, drain and internal pathway at different TW site under PURBASTHALI-I Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000656/2022-2023 359/BWD 30/01/2023 180 PABITRA KUMAR SAMANTA 116.35 72.27 62.11 90
296 PURBA BARDHAMAN Purbasthali - I Burdwan Division RAJAPUR PIPED WATER SUPPLY SCHEME , SM/14021 New Laying of rising main along with crossing of pipeline by HDD/Jack pushing method with other allied work in connection with augmentation of Ganganandapur PWSS (SM/09411) & Rajapur PWSS (SM/ 14021), Purbasthali-I block under Kalna Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000278/2024-2025 2710/BWD 11/07/2024 264 MANASH GHOSH 81.34 65.34 80.33 60
297 PURBA BARDHAMAN Purbasthali - I Burdwan Division RAJAPUR PIPED WATER SUPPLY SCHEME , SM/14021 New Work order for ' Laying of Pipeline and providing FHTC under Rajapur(SM/16308) and Sadhpukharia PWSS (SM/14021) under Kalna Sub-Division under Burdwan Division, PHE Dte. '. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000804/2024-2025 1775/KSD 20/11/2024 39 ER CONSTRUCTION & GENERAL ORDER SUPPLIER 3.33 3.08 92.49 100
298 PURBA BARDHAMAN Purbasthali - I Burdwan Division RAJAPUR PIPED WATER SUPPLY SCHEME , SM/14021 New Additional work for Increasing height of boundary wall & land development work and construction of retaining wall at 2nd TW site and construction of approach road at 1st TW Site of RAJAPUR Water Supply Scheme at Purbasthali-I Block within Kalna Sub- Division under Burdwan Division, PHE Dte. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/001039/2023-2024 782/BWD 27/02/2024 30 THE BENGAL HARDWARE 11.55 8.03 69.52 100
299 PURBA BARDHAMAN Memari - I Burdwan Division SAHAPUR PIPED WATER SUPPLY SCHEME , SM/13425 New Material Requisition To Resource Division RTOR000067/2022-2023 1262/BWD 17/03/2023 Resource Division 7.32 0.00 0 0
300 PURBA BARDHAMAN Memari - I Central Mechanical SAHAPUR PIPED WATER SUPPLY SCHEME , SM/13425 New New Service Connection charges for Sahapur W/S Scheme TW-2 BILL/00603/2023-2024 BP-2023-24-14 17/05/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.08 0.00 0 0
301 PURBA BARDHAMAN Memari - I Central Mechanical SAHAPUR PIPED WATER SUPPLY SCHEME , SM/13425 New New Service Connection charges for Sahapur W/S Scheme TW-1 BILL/00602/2023-2024 BP-2023-24-13 17/05/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 2.90 0.00 0 0
302 PURBA BARDHAMAN Memari - I Burdwan Division SAHAPUR PIPED WATER SUPPLY SCHEME , SM/13425 New Material Requisition To Resource Division RTOR000500/2023-2024 4024/BWD 08/09/2023 Resource Division 2.93 0.00 0 0
303 PURBA BARDHAMAN Memari - I Burdwan Division SAHAPUR PIPED WATER SUPPLY SCHEME , SM/13425 New Material Requisition To Resource Division RTOR000690/2023-2024 5074/BWD 23/11/2023 Resource Division 20.46 0.00 0 0
304 PURBA BARDHAMAN Memari - I Central Mechanical SAHAPUR PIPED WATER SUPPLY SCHEME , SM/13425 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at Sahapur Water Supply Scheme [Block- Memari-1] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER Junior Engineer ORD/000037/2023-2024 2480/CMD 31/05/2023 30 P.K. ENGINEERING 29.29 22.01 75.15 98
305 PURBA BARDHAMAN Memari - I Burdwan Division SAHAPUR PIPED WATER SUPPLY SCHEME , SM/13425 New SAHAPUR Piped Water Supply Scheme with Sinking of tube-well, LDS, Rising Main, FHTC, Construction of 150 cum capacity RCC OHR with 20.0 mtr. with Staging height including soil investigation & construction of switch-rooms & boundary walls at different TW site under Memari-I Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000636/2022-2023 82/BWD 09/01/2023 365 S.K. CONSTRUCTION 256.31 216.98 84.66 100
306 PURBA BARDHAMAN Memari - I Central Mechanical SAHAPUR PIPED WATER SUPPLY SCHEME , SM/13425 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at SAHAPUR & others water supply scheme under Memari-I Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. ASSISTANT ENGINEER Junior Engineer ORD/000100/2024-2025 2392/CMD 02/08/2024 90 MITRA ENTERPRISE 47.62 0.00 0 0
307 PURBA BARDHAMAN Memari - I Burdwan Division SAHAPUR PIPED WATER SUPPLY SCHEME , SM/13425 New Rest portion of OHR (Plaster, Painting and interconnection of Rising Main with Specials) at SAHAPUR Piped Water Supply Scheme under Memari-I Block within Burdwan Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000188/2024-2025 2419/BWD 27/06/2024 90 S.K. CONSTRUCTION 20.60 7.53 36.55 100
308 PURBA BARDHAMAN Galsi - II Burdwan Division SATINANDI PIPED WATER SUPPLY SCHEME , SM/13494 New Material Requisition To Resource Division RTOR000075/2022-2023 1264/BWD 17/03/2023 Resource Division 8.15 0.00 0 0
309 PURBA BARDHAMAN Galsi - II Central Mechanical SATINANDI PIPED WATER SUPPLY SCHEME , SM/13494 New New service connection charges of Satinandi Water Supply Scheme TW-2 BILL/00675/2023-2024 BP-2023-24-26 21/06/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 5.05 0.00 0 0
310 PURBA BARDHAMAN Galsi - II Central Mechanical SATINANDI PIPED WATER SUPPLY SCHEME , SM/13494 New New service connection charges of Satinandi Water Supply Scheme TW-1 BILL/00674/2023-2024 BP-2023-24-25 21/06/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 5.08 0.00 0 0
311 PURBA BARDHAMAN Galsi - II Burdwan Division SATINANDI PIPED WATER SUPPLY SCHEME , SM/13494 New Material Requisition To Resource Division RTOR000497/2023-2024 4021/BWD 08/09/2023 Resource Division 1.24 0.00 0 0
312 PURBA BARDHAMAN Galsi - II Central Mechanical SATINANDI PIPED WATER SUPPLY SCHEME , SM/13494 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at Satinandi Water Supply Scheme [ Block- Galsi-2 ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. Driller In-Charge JUNIOR ENGINEER ORD/000044/2023-2024 2496/CMD 01/06/2023 30 DEY ENTERPRISE 27.74 20.12 72.53 50
313 PURBA BARDHAMAN Galsi - II Burdwan Division SATINANDI PIPED WATER SUPPLY SCHEME , SM/13494 New Material Requisition To Resource Division RTOR000600/2023-2024 4906/BWD 10/11/2023 Resource Division 33.07 0.00 0 0
314 PURBA BARDHAMAN Galsi - II Burdwan Division SATINANDI PIPED WATER SUPPLY SCHEME , SM/13494 New SATINANDI Piped Water Supply Scheme with Sinking of tube-well, LDS, Rising Main, FHTC, Construction of 300 cum capacity RCC OHR with 20.0 mtr. with Staging height including soil investigation & construction of switch-rooms & boundary walls at different TW site under Burdwan-II Block, District:- Purba-Bardhaman [NEW SCHEME]. Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer2, Durgapur Sub-Division, PHE Dte. ORD/000584/2022-2023 5520/BWD 23/12/2022 365 MD HASIN 389.47 215.19 55.25 40
315 PURBA BARDHAMAN Galsi - II Central Mechanical SATINANDI PIPED WATER SUPPLY SCHEME , SM/13494 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Satinandi,Sanko & others water supply scheme under Galsi-1 Block ; Serpur, Uchalan & others water supply scheme under Raina-2 Block and maro, loapur & others water supply scheme under Galsi-2 block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000397/2024-2025 2751/CMD 24/09/2024 90 ORIENTAL ENGINEERING CO. 88.42 0.00 0 0
316 PURBA BARDHAMAN Galsi - II Durgapur W/S Division SATINANDI PIPED WATER SUPPLY SCHEME , SM/13494 New Acceptance cum Formal Work Order for SATINANDI Piped Water Supply Scheme with INSTALLATION OF BARBED WIRE, FHTC ,Road restoration ,DEMOLITION WORK & land development with road at TW site under Galsi-II Block, District:- Purba-Bardhaman under Durgapur W/S Division, PHE Dte. Assistant Engineer-II Contractual Junior Engineer_4 ORD/000183/2024-2025 1620/DWSD 26/11/2024 90 A K SIKDAR 79.05 0.00 0 35
317 PURBA BARDHAMAN Galsi - II Durgapur W/S Division SATINANDI PIPED WATER SUPPLY SCHEME , SM/13494 New Material Requisition To Resource Division RTOR000018/2024-2025 1724/A/DWSD 10/12/2024 Resource Division 0.31 0.00 0 0
318 PURBA BARDHAMAN Galsi - II Durgapur W/S Division SATINANDI PIPED WATER SUPPLY SCHEME , SM/13494 New Material Requisition To Resource Division RTOR000041/2024-2025 461/DWSD 17/03/2025 Resource Division 0.14 0.00 0 0
319 PURBA BARDHAMAN Galsi - II Durgapur W/S Division SATINANDI PIPED WATER SUPPLY SCHEME , SM/13494 New Acceptance cum Formal Work Order for Sinking of 300 x 200 mm dia tube well 150 mtr depth by DR Rig method for trial bore at Tetulmari & Golgram under Satinandi PWSS (JJM), Dist- Purba Bardhaman under Durgapur W/S Division, PHE Dte. Assistant Engineer-II JUNIOR ENGINEER-2 ORD/000185/2024-2025 1596/DWSD 25/11/2024 20 S & P ENTERPRISE 7.50 0.00 0 60
320 PURBA BARDHAMAN Purbasthali - I Burdwan Division KACHUA PIPED WATER SUPPLY SCHEME , SM/13497 New Material Requisition To Resource Division RTOR000298/2023-2024 2197/BWD 12/05/2023 Resource Division 1.90 0.00 0 0
321 PURBA BARDHAMAN Purbasthali - I Burdwan Division KACHUA PIPED WATER SUPPLY SCHEME , SM/13497 New Material Requisition To Resource Division RTOR000473/2023-2024 3997/BWD 08/09/2023 Resource Division 0.55 0.00 0 0
322 PURBA BARDHAMAN Purbasthali - I Burdwan Division KACHUA PIPED WATER SUPPLY SCHEME , SM/13497 New Material Requisition To Resource Division RTOR000799/2023-2024 310/BWD 24/01/2024 Resource Division 17.19 0.00 0 0
323 PURBA BARDHAMAN Purbasthali - I Central Mechanical KACHUA PIPED WATER SUPPLY SCHEME , SM/13497 New New service connection for KACHUA PWSS TW-2. BILL/02396/2023-2024 BP-2023-24-505 06/02/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.03 0.00 0 0
324 PURBA BARDHAMAN Purbasthali - I Central Mechanical KACHUA PIPED WATER SUPPLY SCHEME , SM/13497 New New service connection for KACHUA PWSS TW-1. BILL/02395/2023-2024 BP-2023-24-504 06/02/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 5.27 0.00 0 0
325 PURBA BARDHAMAN Purbasthali - I Central Mechanical KACHUA PIPED WATER SUPPLY SCHEME , SM/13497 New Supply & Installation of Submersible Pumping Machinery , Voltage Stabilizer, Chlorination system and internal House wiring for Tube well no.- 1 & 2 at KACHUA Water Supply Scheme [Block - PURBASTHALI-1] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000828/2023-2024 4105/CMD 29/08/2023 30 MENAKA ENTERPRISE. 20.80 0.00 0 95
326 PURBA BARDHAMAN Purbasthali - I Central Mechanical KACHUA PIPED WATER SUPPLY SCHEME , SM/13497 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Haripur & others water supply scheme under purbasthali 1 Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000072/2024-2025 2397/CMD 02/08/2024 90 CHATTERJEE ENTERPRISE 48.60 0.00 0 0
327 PURBA BARDHAMAN Purbasthali - I Burdwan Division KACHUA PIPED WATER SUPPLY SCHEME , SM/13497 New Work order for "DESIGNING,MAKING AND ERECTION OF SIGN BOARD FOR SAJAL GRAM IN ¿¿9 No... VILLAGE, ¿PURBASTHALI-1 BLOCK UNDER KALNA SUB DIVISION WITHIN BURDWAN DIVISION PHE DTE.(27nos board)" Assistant Engineer Junior Engineer, R.W.S. Burdwan Sub Division, P.H.E. Dt ORD/000951/2024-2025 1976/KSD 05/12/2024 10 OMKAR ENTERPRISE 3.79 0.00 0 100
328 PURBA BARDHAMAN Purbasthali - I Burdwan Division KACHUA PIPED WATER SUPPLY SCHEME , SM/13497 New Different works related (sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of different capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site) to KACHUA & KAMALPUR Piped Water Supply Scheme under Purbasthali ¿ I Block, District:- Purba Bardhaman [NEW SCHEME] Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000133/2023-2024 2344/BWD 22/05/2023 365 CONCORD ENGINEERING 470.92 20.00 4.25 40
329 PURBA BARDHAMAN Purbasthali - I Burdwan Division KACHUA PIPED WATER SUPPLY SCHEME , SM/13497 New Different Types of work involved in connection with Augmentation of SONARUDRA (SM/16349) & KACHUA (SM/13497) Piped Water Supply Scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000192/2024-2025 2430/BWD 27/06/2024 480 R.G. INFRASTRUCTURE 240.70 0.00 0 2
330 PURBA BARDHAMAN Ausgram - II Burdwan Division AMARPUR PIPED WATER SUPPLY SCHEME , SM/13967 New Material Requisition To Resource Division RTOR000043/2023-2024 1962/BWD 25/04/2023 Resource Division 9.35 0.00 0 0
331 PURBA BARDHAMAN Ausgram - II Burdwan Division AMARPUR PIPED WATER SUPPLY SCHEME , SM/13967 New Material Requisition To Resource Division RTOR000208/2023-2024 2155/BWD 10/05/2023 Resource Division 20.19 0.00 0 0
332 PURBA BARDHAMAN Ausgram - II Burdwan Division AMARPUR PIPED WATER SUPPLY SCHEME , SM/13967 New Material Requisition To Resource Division RTOR000611/2023-2024 4932/BWD 10/11/2023 Resource Division 30.36 0.00 0 0
333 PURBA BARDHAMAN Ausgram - II Central Mechanical AMARPUR PIPED WATER SUPPLY SCHEME , SM/13967 New NEW SERVICE CONNECTION FOR AMARPUR PWSS PH 1. BILL/02866/2023-2024 BP-2023-24-604 06/03/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.37 0.00 0 0
334 PURBA BARDHAMAN Ausgram - II Central Mechanical AMARPUR PIPED WATER SUPPLY SCHEME , SM/13967 New NEW SERVICE CONNECTION FOR AMARPUR PWSS PH 2. BILL/02867/2023-2024 BP-2023-24-605 06/03/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 2.88 0.00 0 0
335 PURBA BARDHAMAN Ausgram - II Burdwan Division AMARPUR PIPED WATER SUPPLY SCHEME , SM/13967 New Sinking of Tube-wells, LDS, Rising Main, FHTC, Construction of 200 cum capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation, construction of switch rooms, boundary walls with gates, land development, internal drains and internal pathways for AMARPUR Piped Water Supply Scheme under Ausgram-II Block, District:- Purba-Bardhaman [NEW SCHEME] ORD/000820/2023-2024 4952/BWD 17/11/2023 365 SUJAY KUMAR RAY 344.32 0.00 0 50
336 PURBA BARDHAMAN Ausgram - II Central Mechanical AMARPUR PIPED WATER SUPPLY SCHEME , SM/13967 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Chora, Kalaijhuti & others water supply scheme under Ausgram-2 Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. Driller In-Charge JUNIOR ENGINEER ORD/000143/2024-2025 2405/CMD 02/08/2024 90 NABAUDYOG ELECTRICAL ENGINEERING CO-OPERATIVE SOCIETY LTD 95.26 0.00 0 0
337 PURBA BARDHAMAN Ausgram - II Durgapur W/S Division AMARPUR PIPED WATER SUPPLY SCHEME , SM/13967 New Formal Work Order for Additional work for laying 200 mm dia HDPE pipe line and other necessary allied works Amarpur & Bhedia Piped W/S Scheme, Block- Aushgram-2, Dist- Purba Bardhaman under Durgapur W/S Division, PHE Dte. Assistant Engineer-II JUNIOR ENGINEER-1,JUNIOR ENGINEER-2 ORD/000141/2024-2025 1291/DWSD 06/09/2024 210 SAIKAT RAY 196.61 0.00 0 60
338 PURBA BARDHAMAN Ausgram - II Central Mechanical AMARPUR PIPED WATER SUPPLY SCHEME , SM/13967 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at Amarpur Water Supply Scheme [ Block- Ausgram-2 ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. Driller In-Charge JUNIOR ENGINEER ORD/000913/2023-2024 4177/CMD 29/08/2023 611 AMUSAR IMPEX PVT. LTD. 28.55 0.00 0 96
339 PURBA BARDHAMAN Bhatar Burdwan Division MANDARDIHI PIPED WATER SUPPLY SCHEME , SM/14052 New Material Requisition To Resource Division RTOR000080/2022-2023 1238/BWD 17/03/2023 Resource Division 2.16 0.00 0 0
340 PURBA BARDHAMAN Bhatar Central Mechanical MANDARDIHI PIPED WATER SUPPLY SCHEME , SM/14052 New New service connection charges for Mandardihi PWSS TW-1 BILL/01050/2023-2024 BP-2023-24-119 17/08/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 5.61 0.00 0 0
341 PURBA BARDHAMAN Bhatar Central Mechanical MANDARDIHI PIPED WATER SUPPLY SCHEME , SM/14052 New New service connection charges for Mandardihi PWSS TW-2 BILL/01420/2023-2024 BP-2023-24-148 31/08/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.15 0.00 0 0
342 PURBA BARDHAMAN Bhatar Burdwan Division MANDARDIHI PIPED WATER SUPPLY SCHEME , SM/14052 New Material Requisition To Resource Division RTOR000752/2023-2024 5247/BWD 30/11/2023 Resource Division 18.50 0.00 0 0
343 PURBA BARDHAMAN Bhatar Burdwan Division MANDARDIHI PIPED WATER SUPPLY SCHEME , SM/14052 New MANDARDIHI (PART:-B) Piped Water Supply Scheme with LDS & FHTC [NODE POINT 49 TO 77] under Bhatar Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer ORD/000717/2022-2023 919/BWD 02/03/2023 30 PAPRI HAZRA 18.89 13.12 69.45 100
344 PURBA BARDHAMAN Bhatar Central Mechanical MANDARDIHI PIPED WATER SUPPLY SCHEME , SM/14052 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at MANDARDIHI Water Supply Scheme [ Block- BHATAR] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000359/2023-2024 3504/CMD 31/07/2023 668 S.K. ELECTRICALS 26.96 9.41 34.9 90
345 PURBA BARDHAMAN Bhatar Burdwan Division MANDARDIHI PIPED WATER SUPPLY SCHEME , SM/14052 New MANDARDIHI (PART:-A) Piped Water Supply Scheme with sinking of Tube-well, LDS, Rising Main, FHTC & construction of switch rooms & boundary walls with gates and land development, drain and internal pathway at different TW site under Bhatar Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer2, Durgapur Sub-Division, PHE Dte. ORD/000719/2022-2023 928/BWD 02/03/2023 60 DUBE ENTERPRISE 63.01 30.51 48.42 30
346 PURBA BARDHAMAN Bhatar Central Mechanical MANDARDIHI PIPED WATER SUPPLY SCHEME , SM/14052 New Emergency installation (for urgent FHTC) at Mandardihi Water Supply Scheme PH 2 (part-3) under CMD, PHE Dte., Dist.- Purba-Bardhaman ASSISTANT ENGINEER JUNIOR ENGINEER ORD/001676/2023-2024 83/CMSD 15/01/2024 12 CHOUDHURY ENTERPRISE 0.92 0.00 0 100
347 PURBA BARDHAMAN Bhatar Central Mechanical MANDARDIHI PIPED WATER SUPPLY SCHEME , SM/14052 New Supply and delivery of submersible pumping machinery (for urgent FHTC) for mandardihi Water Supply Scheme PH 2 (part-2) under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/001672/2023-2024 66/CMSD 11/01/2024 12 CHOUDHURY ENTERPRISE 0.81 0.00 0 100
348 PURBA BARDHAMAN Bhatar Central Mechanical MANDARDIHI PIPED WATER SUPPLY SCHEME , SM/14052 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Karjana & others water supply scheme under Bhatar Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000067/2024-2025 2394/CMD 02/08/2024 90 AHALYA ENGINEERING WORKS 82.00 0.00 0 0
349 PURBA BARDHAMAN Bhatar Central Mechanical MANDARDIHI PIPED WATER SUPPLY SCHEME , SM/14052 New Supply and delivery of different Electro-mechanical items (for urgent FHTC) for Mandardihi Water Supply Scheme PH 2 (part-1) under CMD, PHE Dte., Dist.- Purba-Bardhaman ASSISTANT ENGINEER JUNIOR ENGINEER ORD/001748/2023-2024 19/CMSD 04/01/2024 10 CHOUDHURY ENTERPRISE 0.91 0.00 0 100
350 PURBA BARDHAMAN Bhatar Burdwan Division MANDARDIHI PIPED WATER SUPPLY SCHEME , SM/14052 New Restoration of Concrete Road , Providing Sluice Valve , Land development and Construction of Approach road at Pump House site of Mandardihi piped water supply scheme of JJM in Bhatar Block , District Purba Bardhaman, Durgapur Sub Division under Burdwan Division, P.H.E. Dte. ORD/001300/2024-2025 382/DSD 10/03/2025 45 TARAMA AGENCY 4.79 0.00 0 100
351 PURBA BARDHAMAN Katwa - II Burdwan Division AKHRA PIPED WATER SUPPLY SCHEME , SM/14057 New Material Requisition To Resource Division RTOR000179/2023-2024 2155/BWD 10/05/2023 Resource Division 14.84 0.00 0 0
352 PURBA BARDHAMAN Katwa - II Central Mechanical AKHRA PIPED WATER SUPPLY SCHEME , SM/14057 New New service connection charges for Akhra PWSS TW-2 BILL/00757/2023-2024 BP-2023-24-57 17/07/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 2.39 0.00 0 0
353 PURBA BARDHAMAN Katwa - II Central Mechanical AKHRA PIPED WATER SUPPLY SCHEME , SM/14057 New New service connection charges for Akhra PWSS TW-1 BILL/00756/2023-2024 BP-2023-24-56 17/07/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 4.96 0.00 0 0
354 PURBA BARDHAMAN Katwa - II Burdwan Division AKHRA PIPED WATER SUPPLY SCHEME , SM/14057 New Material Requisition To Resource Division RTOR000493/2023-2024 4017/BWD 08/09/2023 Resource Division 23.30 0.00 0 0
355 PURBA BARDHAMAN Katwa - II Burdwan Division AKHRA PIPED WATER SUPPLY SCHEME , SM/14057 New Material Requisition To Resource Division RTOR000630/2023-2024 4882/BWD 10/11/2023 Resource Division 26.00 0.00 0 0
356 PURBA BARDHAMAN Katwa - II Central Mechanical AKHRA PIPED WATER SUPPLY SCHEME , SM/14057 New Hiring of Inspection Vehicle (Diesel/CNG/LPG Driven) for supervision of site for the office of Assistant Engineer, under C.M.D. P.H.E. Dte. w.e.f.- 01/11/2023 to 31/12/2023. [Under JJM Works]. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/001302/2023-2024 859/CMSD 30/10/2023 61 SUBRATA BHADRA 0.80 0.40 50 100
357 PURBA BARDHAMAN Katwa - II Central Mechanical AKHRA PIPED WATER SUPPLY SCHEME , SM/14057 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Mulgram & others water supply scheme under Katwa-II Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. ASSISTANT ENGINEER Junior Engineer ORD/000070/2024-2025 2409/CMD 02/08/2024 90 DUTTA ENTERPRISE 50.18 0.00 0 0
358 PURBA BARDHAMAN Katwa - II Burdwan Division AKHRA PIPED WATER SUPPLY SCHEME , SM/14057 New AKHARA Piped Water Supply Scheme with sinking of Tube-well, LDS, Rising Main, FHTC, Construction of 250 cum capacity RCC OHR with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drain and internal pathway at different TW site under KATWA-II Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer JUNIOR ENGINEER KATWA SUB-DIVISION PHE DTE ORD/000011/2023-2024 1725/BWD 13/04/2023 629 MANASH GHOSH 455.23 196.62 43.19 78
359 PURBA BARDHAMAN Katwa - II Central Mechanical AKHRA PIPED WATER SUPPLY SCHEME , SM/14057 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at Akhra Water Supply Scheme [ Block- KATWA-2 ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. Driller In-Charge Junior Engineer ORD/000135/2023-2024 2760/CMD 28/06/2023 275 CHOUDHURY ENTERPRISE 27.73 15.90 57.34 40
360 PURBA BARDHAMAN Katwa - II Burdwan Division AKHRA PIPED WATER SUPPLY SCHEME , SM/14057 New Providing of balance FHTC and other allied works at Benga, Nowapara under the command area of AKHARA PWSS (SM/14057) in order to declare Sajal Gram, under Katwa-II Block under Katwa Sub-Division, PHE Dte. Assistant Engineer ORD/001313/2024-2025 979/BWD 13/03/2025 21 MANASH GHOSH 8.52 0.00 0 0
361 PURBA BARDHAMAN Katwa - II Burdwan Division AKHRA PIPED WATER SUPPLY SCHEME , SM/14057 New Providing of balance FHTC and other allied works at Akhra, Bishnupur under the command area of AKHARA PWSS (SM/14057) in order to declare Sajal Gram, under Katwa-II Block under Katwa Sub-Division, PHE Dte. Assistant Engineer ORD/001312/2024-2025 978/BWD 13/03/2025 21 MANASH GHOSH 8.28 0.00 0 0
362 PURBA BARDHAMAN Manteswar Burdwan Division Ground Water Supply Based Piped Water Supply Scheme For KHULE PWSS in Manteshwar Block of Purab Burdwan District under Burdwan Division, PHE Dte , SM/14425 New Material Requisition To Resource Division RTOR000046/2023-2024 1962/BWD 25/04/2023 Resource Division 56.68 0.00 0 0
363 PURBA BARDHAMAN Manteswar Burdwan Division Ground Water Supply Based Piped Water Supply Scheme For KHULE PWSS in Manteshwar Block of Purab Burdwan District under Burdwan Division, PHE Dte , SM/14425 New Material Requisition To Resource Division RTOR000180/2023-2024 2155/BWD 10/05/2023 Resource Division 18.09 0.00 0 0
364 PURBA BARDHAMAN Manteswar Central Mechanical Ground Water Supply Based Piped Water Supply Scheme For KHULE PWSS in Manteshwar Block of Purab Burdwan District under Burdwan Division, PHE Dte , SM/14425 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at Khule Water Supply Scheme [ Block- Monteshwar ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000923/2023-2024 4186/CMD 29/08/2023 30 CINZANO 29.10 0.00 0 0
365 PURBA BARDHAMAN Manteswar Central Mechanical Ground Water Supply Based Piped Water Supply Scheme For KHULE PWSS in Manteshwar Block of Purab Burdwan District under Burdwan Division, PHE Dte , SM/14425 New NEW SERVICE CONNECTION FOR KHULE PWSS. BILL/02697/2023-2024 BP-2023-24-570 27/02/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 13.79 0.00 0 0
366 PURBA BARDHAMAN Manteswar Central Mechanical Ground Water Supply Based Piped Water Supply Scheme For KHULE PWSS in Manteshwar Block of Purab Burdwan District under Burdwan Division, PHE Dte , SM/14425 New NEW SERVICE CONNECTION FOR KHULE PWSS. BILL/02696/2023-2024 BP-2023-24-569 27/02/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.69 0.00 0 0
367 PURBA BARDHAMAN Manteswar Burdwan Division Ground Water Supply Based Piped Water Supply Scheme For KHULE PWSS in Manteshwar Block of Purab Burdwan District under Burdwan Division, PHE Dte , SM/14425 New Work Order for "CONSTRUCTION OF TEMPORARY KIOSK FOR THE NECESSARY ARRANGEMENT OF ELECTRIFICATION OF TUBEWELL FOR ANUKHAL PWSS UNDER KALNA SUB-DIVISION UNDER BURDWAN DIVISION, PHE DTE." Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000962/2024-2025 1236/KSD 30/09/2024 15 SINGHA ROY AND CO. 0.66 0.00 0 0
368 PURBA BARDHAMAN Manteswar Burdwan Division Ground Water Supply Based Piped Water Supply Scheme For KHULE PWSS in Manteshwar Block of Purab Burdwan District under Burdwan Division, PHE Dte , SM/14425 New Work order for " CONSTRUCTION OF TEMPORARY KIOSK FOR THE NECESSARY ARRANGEMENT OF ELECTRIFICATION OF TUBEWELL FOR DOGACHHIA PWSS UNDER KALNA SUBDIVISION UNDER BURDWAN DIVISION, PHE DTE." Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000963/2024-2025 1237/KSD 30/09/2024 15 MITRA CONSTRUCTION 0.66 0.00 0 0
369 PURBA BARDHAMAN Manteswar Burdwan Division Ground Water Supply Based Piped Water Supply Scheme For KHULE PWSS in Manteshwar Block of Purab Burdwan District under Burdwan Division, PHE Dte , SM/14425 New KHULE Piped Water Supply Scheme with sinking of Tube-well, LDS,Rising Main, FHTC, Construction of 300 cum capacity RCC OHR with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drain and internal pathway at different TW site under Manteswar Block, District:- Purba-Bardhaman [NEW SCHEME]. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000004/2023-2024 1618/BWD 05/04/2023 365 AZAD ENTERPRISE 598.72 219.64 36.68 55
370 PURBA BARDHAMAN Manteswar Central Mechanical Ground Water Supply Based Piped Water Supply Scheme For KHULE PWSS in Manteshwar Block of Purab Burdwan District under Burdwan Division, PHE Dte , SM/14425 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Sutra & others water supply scheme under Monteswar Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000068/2024-2025 2396/CMD 02/08/2024 455 SINHA ELECTRICALS 78.06 0.00 0 20
371 PURBA BARDHAMAN Manteswar Burdwan Division Ground Water Supply Based Piped Water Supply Scheme For KHULE PWSS in Manteshwar Block of Purab Burdwan District under Burdwan Division, PHE Dte , SM/14425 New Work Order for "CONSTRUCTION OF TEMPORARY KIOSK FOR THE NECESSARY ARRANGEMENT OF ELECTRIFICATION OF TUBEWELL FOR KHULE PWSS UNDER KALNA SUB-DIVISION UNDER BURDWAN DIVISION, PHE DTE.". Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/001289/2024-2025 1232/KSD 27/09/2024 15 WESTON ENGINEERS 0.66 0.00 0 100
372 PURBA BARDHAMAN Manteswar Burdwan Division Ground Water Supply Based Piped Water Supply Scheme For KHULE PWSS in Manteshwar Block of Purab Burdwan District under Burdwan Division, PHE Dte , SM/14425 New Pipeline laying by HDD method and different types of balance works in connection with different Augmentation & New Scheme [(SM/ 08103), (SM/13413), (SM/15587), (SM/16035), (SM/16287), (SM/16029), (SM/15581), (SM/14437), (SM/16028), (SM/16036) & (SM/14425)] within Kalna Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer ORD/001270/2024-2025 849/BWD 05/03/2025 180 S.P. CONSTRUCTION 683.30 0.00 0 0
373 PURBA BARDHAMAN Manteswar Burdwan Division SHUSHNA PIPED WATER SUPPLY SCHEME , SM/14438 New Material Requisition To Resource Division RTOR000319/2023-2024 2197/BWD 12/05/2023 Resource Division 12.94 0.00 0 0
374 PURBA BARDHAMAN Manteswar Burdwan Division SHUSHNA PIPED WATER SUPPLY SCHEME , SM/14438 New Material Requisition To Resource Division RTOR000455/2023-2024 3979/BWD 08/09/2023 Resource Division 32.04 0.00 0 0
375 PURBA BARDHAMAN Manteswar Central Mechanical SHUSHNA PIPED WATER SUPPLY SCHEME , SM/14438 New New Service connection at SHUSHNA PWSS TW-1. BILL/02359/2023-2024 BP-2023-24-481 31/01/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 5.48 0.00 0 0
376 PURBA BARDHAMAN Manteswar Central Mechanical SHUSHNA PIPED WATER SUPPLY SCHEME , SM/14438 New New service at Shushna PWSS TW-2. BILL/02291/2023-2024 BP-2023-24-440 29/01/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 5.03 0.00 0 0
377 PURBA BARDHAMAN Manteswar Burdwan Division SHUSHNA PIPED WATER SUPPLY SCHEME , SM/14438 New Providing FHTC with laying of 90 mm dia HDPE Pipe of Susunia PWSS of kalsar village under Manteswar Block under Durgapur Sub Division of Burdwan Division ,P.H.E.Dte Junior Engineer1, Durgapur Sub-Division, PHE Dte. ORD/001162/2023-2024 267./DSD 15/03/2024 382 PRONAB KUMAR DEY 0.97 0.00 0 100
378 PURBA BARDHAMAN Manteswar Burdwan Division SHUSHNA PIPED WATER SUPPLY SCHEME , SM/14438 New Providing FHTC with laying of 90 mm dia HDPE Pipe of Susunia PWSS of Kuli village under Manteswar Block under Durgapur Sub Division of Burdwan Division ,P.H.E.Dte ORD/001163/2023-2024 269/DSD 15/03/2024 30 SOUMYAVASH DAS 0.94 0.00 0 0
379 PURBA BARDHAMAN Manteswar Burdwan Division SHUSHNA PIPED WATER SUPPLY SCHEME , SM/14438 New Construction of valve chamber HD works site and installation of sluice valve at Budpur village of Susunia PWSS under Manteswar Block under Durgapur Sub Division of Burdwan Division ,P.H.E.Dte ORD/001164/2023-2024 268./DSD 15/03/2024 30 PRONAB KUMAR DEY 0.94 0.00 0 0
380 PURBA BARDHAMAN Manteswar Burdwan Division SHUSHNA PIPED WATER SUPPLY SCHEME , SM/14438 New Providing FHTC with laying of 90 mm dia HDPE Pipe of Susunia PWSS under Manteswar Block under Durgapur Sub Division of Burdwan Division ,P.H.E.Dte ORD/001161/2023-2024 266/DSD 15/03/2024 30 PRONAB KUMAR DEY 0.95 0.00 0 0
381 PURBA BARDHAMAN Manteswar Central Mechanical SHUSHNA PIPED WATER SUPPLY SCHEME , SM/14438 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at Shushna Water Supply Scheme [ Block- MONTESWAR ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000761/2023-2024 4062/CMD 29/08/2023 30 ORIENTAL ENGINEERING CO. 28.97 0.00 0 80
382 PURBA BARDHAMAN Manteswar Burdwan Division SHUSHNA PIPED WATER SUPPLY SCHEME , SM/14438 New Different works related (sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of different capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site) to PASCHIM KHARAMPUR, SHUSHNA & SIGHNALI Piped Water Supply Scheme under Manteswar Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer1, Durgapur Sub-Division, PHE Dte. ORD/000482/2023-2024 3494/BWD 09/08/2023 511 S.P. CONSTRUCTION 1,925.07 0.00 0 60
383 PURBA BARDHAMAN Manteswar Central Mechanical SHUSHNA PIPED WATER SUPPLY SCHEME , SM/14438 New Supply and installation of Electro-Magnetic flow meter at Bazar Mahammadpur, Dhatrigram, Arjunpukur & others water supply scheme under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000590/2024-2025 3105/CMD 11/12/2024 60 SHREE BISHNU CONSTRUCTION 19.77 0.00 0 0
384 PURBA BARDHAMAN Manteswar Central Mechanical SHUSHNA PIPED WATER SUPPLY SCHEME , SM/14438 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Sutra & others water supply scheme under Monteswar Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000068/2024-2025 2396/CMD 02/08/2024 455 SINHA ELECTRICALS 78.06 0.00 0 20
385 PURBA BARDHAMAN Kalna - I Burdwan Division TAIPARA Piped Water Supply Scheme. , SM/14442 New Material Requisition To Resource Division RTOR000044/2023-2024 1962/BWD 25/04/2023 Resource Division 22.25 0.00 0 0
386 PURBA BARDHAMAN Kalna - I Burdwan Division TAIPARA Piped Water Supply Scheme. , SM/14442 New Material Requisition To Resource Division RTOR000183/2023-2024 2155/BWD 10/05/2023 Resource Division 14.82 0.00 0 0
387 PURBA BARDHAMAN Kalna - I Burdwan Division TAIPARA Piped Water Supply Scheme. , SM/14442 New Material Requisition To Resource Division RTOR000628/2023-2024 4888/BWD 10/11/2023 Resource Division 29.45 0.00 0 0
388 PURBA BARDHAMAN Kalna - I Central Mechanical TAIPARA Piped Water Supply Scheme. , SM/14442 New Quotation for New Electric Connection for Taipara W/S Scheme PH NO.-1 BILL/01733/2023-2024 BP-2023-24-248 07/12/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 9.10 0.00 0 0
389 PURBA BARDHAMAN Kalna - I Central Mechanical TAIPARA Piped Water Supply Scheme. , SM/14442 New Electric quotation for New Service Connection at Taipara W/S Scehem PH-2. BILL/01776/2023-2024 BP-2023-24-288 26/12/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.67 0.00 0 0
390 PURBA BARDHAMAN Kalna - I Burdwan Division TAIPARA Piped Water Supply Scheme. , SM/14442 New Work Order for "CONSTRUCTION OF TEMPORARY KIOSK FOR THE NECESSARY ARRANGEMENT OF ELECTRIFICATION OF TUBEWELL UNDER PATHARDANGA PWSS AND TAIPARA PWSS UNDER KALNA SUB-DIVISION UNDER BURDWAN DIVISION, PHE DTE. (2 UNITS:- 1 NO FOR PATHARDANGA PWSS & 1 NO FOR TAIPARA PWSS)" Assistant Engineer Junior Engineer, R.W.S. Burdwan Sub Division, P.H.E. Dt ORD/001141/2023-2024 1977/KSD 09/02/2024 10 BISWAS ENTERPRISE 0.66 0.00 0 100
391 PURBA BARDHAMAN Kalna - I Central Mechanical TAIPARA Piped Water Supply Scheme. , SM/14442 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at Taipara Water Supply Scheme [ Block- KALNA-1 ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000762/2023-2024 4063/CMD 29/08/2023 30 P.K. ENGINEERING 28.89 0.00 0 90
392 PURBA BARDHAMAN Kalna - I Central Mechanical TAIPARA Piped Water Supply Scheme. , SM/14442 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Joykrishnapur & others water supply scheme under Purbasthali-2,jamalpur,kalna 1 Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000101/2024-2025 2398/CMD 02/08/2024 90 MS S G ENTERPRISE 53.43 0.00 0 0
393 PURBA BARDHAMAN Kalna - I Burdwan Division TAIPARA Piped Water Supply Scheme. , SM/14442 New Different works related (sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of different capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site) to TAIPARA & NIRALGACHHI Piped Water Supply Scheme under Manteswar Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer Junior Engineer, R.W.S. Burdwan Sub Division, P.H.E. Dt ORD/000048/2023-2024 1825/BWD 19/04/2023 865 S. GHOSH & ASSOCIATES PVT LTD. 1,064.74 51.63 4.85 85
394 PURBA BARDHAMAN Kalna - I Burdwan Division TAIPARA Piped Water Supply Scheme. , SM/14442 New Work Order for "Restoration of pipeline with other allied works at different places of Dhaleswar mouja under Taipara Pwss due to construction of rcc cover drain & widening of rcc concrete road constructed by PRI body under Kalna-I panchayat samiti under Kalna Sub-Division under Burdwan Division, PHE Dte." Assistant Engineer Junior Engineer, R.W.S. Burdwan Sub Division, P.H.E. Dt ORD/000548/2024-2025 973/KSD 31/07/2024 10 S.GHOSH & ASSOCIATES PVT LTD. 2.29 2.15 93.89 100
395 PURBA BARDHAMAN Kalna - I Burdwan Division TAIPARA Piped Water Supply Scheme. , SM/14442 New Work order for "Restoration of pipeline with other allied works at different places of Bagpur mouja under Taipara Pwss due to construction of rcc cover drain & widening of rcc concrete road constructed by PRI body under Kalna-I panchayat samiti under Kalna Sub-Division under Burdwan Division, PHE Dte." Assistant Engineer Junior Engineer, R.W.S. Burdwan Sub Division, P.H.E. Dt ORD/000528/2024-2025 971/KSD 31/07/2024 10 S.GHOSH & ASSOCIATES PVT LTD. 2.84 2.62 92.25 100
396 PURBA BARDHAMAN Kalna - I Burdwan Division TAIPARA Piped Water Supply Scheme. , SM/14442 New Work order for "Restoration of pipeline with other allied works at different places of Rajkhara mouja under Taipara Pwss due to construction of rcc cover drain & widening of rcc concrete road constructed by PRI body under Kalna-I panchayat samiti under Kalna Sub-Division under Burdwan Division, PHE Dte.". Assistant Engineer Junior Engineer, R.W.S. Burdwan Sub Division, P.H.E. Dt ORD/000527/2024-2025 970/KSD 31/07/2024 10 S.GHOSH & ASSOCIATES PVT LTD. 2.75 2.69 97.82 100
397 PURBA BARDHAMAN Kalna - I Burdwan Division TAIPARA Piped Water Supply Scheme. , SM/14442 New Work Order for "Restoration of pipeline with other allied works at different places of Bherua mouja under Taipara Pwss due to construction of rcc cover drain & widening of rcc concrete road constructed by PRI body under Kalna-I panchayat samiti under Kalna Sub-Division under Burdwan Division, PHE Dte." Assistant Engineer Junior Engineer, R.W.S. Burdwan Sub Division, P.H.E. Dt ORD/000529/2024-2025 972/KSD 31/07/2024 10 S.GHOSH & ASSOCIATES PVT LTD. 3.39 3.28 96.76 100
398 PURBA BARDHAMAN Kalna - I Burdwan Division TAIPARA Piped Water Supply Scheme. , SM/14442 New Work order for "Restoration of pipeline with other allied works at different places of Chaugharia mouja under Taipara Pwss due to construction of rcc cover drain & widening of rcc concrete road constructed by PRI body under Kalna-I panchayat samiti under Kalna Sub-Division under Burdwan Division, PHE Dte." Assistant Engineer Junior Engineer, R.W.S. Burdwan Sub Division, P.H.E. Dt ORD/000863/2024-2025 1848/KSD 27/11/2024 15 S.GHOSH & ASSOCIATES PVT LTD. 3.17 0.00 0 100
399 PURBA BARDHAMAN Kalna - I Burdwan Division TAIPARA Piped Water Supply Scheme. , SM/14442 New Work order for "Restoration of pipeline with other allied works at different places of Narayanpur mouja under Taipara Pwss due to construction of rcc cover drain & widening of rcc concrete road constructed by PRI body under Kalna-I panchayat samiti under Kalna Sub-Division under Burdwan Division, PHE Dte.". Assistant Engineer Junior Engineer, R.W.S. Burdwan Sub Division, P.H.E. Dt ORD/000865/2024-2025 1850/KSD 27/11/2024 15 S.GHOSH & ASSOCIATES PVT LTD. 3.58 0.00 0 100
400 PURBA BARDHAMAN Kalna - I Burdwan Division TAIPARA Piped Water Supply Scheme. , SM/14442 New Work order for "Restoration of pipeline with other allied works at different places of Kulera mouja under Taipara Pwss due to construction of rcc cover drain & widening of rcc concrete road constructed by PRI body under Kalna-I panchayat samiti under Kalna Sub-Division under Burdwan Division, PHE Dte." Assistant Engineer Junior Engineer, R.W.S. Burdwan Sub Division, P.H.E. Dt ORD/000866/2024-2025 1851/KSD 27/11/2024 15 S.GHOSH & ASSOCIATES PVT LTD. 3.64 0.00 0 100
401 PURBA BARDHAMAN Mangolkote Burdwan Division GOBARDHANPUR PIPED WATER SUPPLY SCHEME , SM/14445 New Material Requisition To Resource Division RTOR000112/2023-2024 1965/BWD 26/04/2023 Resource Division 17.79 0.00 0 0
402 PURBA BARDHAMAN Mangolkote Burdwan Division GOBARDHANPUR PIPED WATER SUPPLY SCHEME , SM/14445 New Material Requisition To Resource Division RTOR000385/2023-2024 2197/BWD 12/05/2023 Resource Division 13.53 0.00 0 0
403 PURBA BARDHAMAN Mangolkote Central Mechanical GOBARDHANPUR PIPED WATER SUPPLY SCHEME , SM/14445 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at GOBARDHANPUR Water Supply Scheme [ Block- MONGOLKOTE] under CMD, PHE Dte., Dist.- Purba-Bardhaman. [3rd CALL] Driller In-Charge Junior Engineer ORD/000933/2023-2024 4196/CMD 29/08/2023 30 M/S, S.S. ENTERPRISE. 29.71 0.00 0 0
404 PURBA BARDHAMAN Mangolkote Burdwan Division GOBARDHANPUR PIPED WATER SUPPLY SCHEME , SM/14445 New Material Requisition To Resource Division RTOR000714/2023-2024 5277/BWD 30/11/2023 Resource Division 20.37 0.00 0 0
405 PURBA BARDHAMAN Mangolkote Central Mechanical GOBARDHANPUR PIPED WATER SUPPLY SCHEME , SM/14445 New Quotation for new service connection for Gobardhanpur PWSS TW-2. BILL/00252/2024-2025 BP-2024-25-131 05/06/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 7.11 0.00 0 0
406 PURBA BARDHAMAN Mangolkote Central Mechanical GOBARDHANPUR PIPED WATER SUPPLY SCHEME , SM/14445 New Quotation for new service connection at Gobardhanpur PWSS TW-1 BILL/01087/2024-2025 BP-2024-25-397 22/11/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.93 0.00 0 0
407 PURBA BARDHAMAN Mangolkote Burdwan Division GOBARDHANPUR PIPED WATER SUPPLY SCHEME , SM/14445 New Different works related (sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of different capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site) to DEULIA, GOBARDHANPUR, KHARIJA-KASHIGRAM & UNIATATARPUR Piped Water Supply Scheme under Mangolkote Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer JUNIOR ENGINEER KATWA SUB-DIVISION PHE DTE ORD/000477/2023-2024 3491/BWD 09/08/2023 815 POWER TOOLS & ENGINEERING 1,741.05 0.00 0 10
408 PURBA BARDHAMAN Mangolkote Central Mechanical GOBARDHANPUR PIPED WATER SUPPLY SCHEME , SM/14445 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Lakshimpur & others water supply scheme under Mangalkote Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman Driller In-Charge Junior Engineer ORD/000097/2024-2025 2406/CMD 02/08/2024 290 CHOUDHURY ENTERPRISE 57.65 0.00 0 10
409 PURBA BARDHAMAN Ketugram - II Burdwan Division GURPARA PIPED WATER SUPPLY SCHEME , SM/14447 New Material Requisition To Resource Division RTOR000063/2023-2024 1962/BWD 25/04/2023 Resource Division 9.42 0.00 0 0
410 PURBA BARDHAMAN Ketugram - II Burdwan Division GURPARA PIPED WATER SUPPLY SCHEME , SM/14447 New Material Requisition To Resource Division RTOR000150/2023-2024 2155/BWD 10/05/2023 Resource Division 17.31 0.00 0 0
411 PURBA BARDHAMAN Ketugram - II Burdwan Division GURPARA PIPED WATER SUPPLY SCHEME , SM/14447 New Material Requisition To Resource Division RTOR000625/2023-2024 4871/BWD 10/11/2023 Resource Division 29.60 0.00 0 0
412 PURBA BARDHAMAN Ketugram - II Central Mechanical GURPARA PIPED WATER SUPPLY SCHEME , SM/14447 New Quotation for new service connection at Gurpara W/S Scheme PH-I. BILL/01809/2023-2024 BP-2023-24-308 30/12/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 4.28 0.00 0 0
413 PURBA BARDHAMAN Ketugram - II Central Mechanical GURPARA PIPED WATER SUPPLY SCHEME , SM/14447 New New service connection at Guyrpara PWSS TW No.2 BILL/02376/2023-2024 BP-2023-24-488 01/02/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 4.90 0.00 0 0
414 PURBA BARDHAMAN Ketugram - II Central Mechanical GURPARA PIPED WATER SUPPLY SCHEME , SM/14447 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Kankurhati & others water supply scheme under Ketugram-2 Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. Driller In-Charge Junior Engineer ORD/000103/2024-2025 2408/CMD 02/08/2024 90 DIPALI CONSTRUCTION 41.95 0.00 0 0
415 PURBA BARDHAMAN Ketugram - II Central Mechanical GURPARA PIPED WATER SUPPLY SCHEME , SM/14447 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at Gurpara Water Supply Scheme [ Block- Ketugram-2 ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. Driller In-Charge Junior Engineer ORD/000749/2023-2024 4059/CMD 29/08/2023 30 ANANTA ELECTRICAL ENGINEERING CONSTRUCTION 26.93 0.00 0 91
416 PURBA BARDHAMAN Ketugram - II Burdwan Division GURPARA PIPED WATER SUPPLY SCHEME , SM/14447 New Different works related (sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of different capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site) to BILLESWAR, GURPARA & PURULIA Piped Water Supply Scheme under KETUGRAM-II Block, District:- Purba Bardhaman [NEW SCHEME] Assistant Engineer JUNIOR ENGINEER KATWA SUB-DIVISION PHE DTE,JUNIOR ENGINEER R.W.S. BURDWAN SUB-DIVISION PHE DTE ORD/000038/2023-2024 1821/BWD 18/04/2023 897 PASCON 1,118.33 92.27 8.25 46
417 PURBA BARDHAMAN Ketugram - II Burdwan Division GURPARA PIPED WATER SUPPLY SCHEME , SM/14447 New Balance work of OHR, construction Concrete Road, Drum Sheet Pilling, Functional Household Tap Connection, construction of HUME Pipe culvert, land development, Road restoration etc. under Billeswar PWSS, Purulia PWSS & Gurpara PWSS under KATWA -II Block under Katwa Sub-Divn. under Burdwan Division, PHED. District:- Purba-Bardhaman Assistant Engineer JUNIOR ENGINEER KATWA SUB-DIVISION PHE DTE ORD/000310/2024-2025 2834/BWD 19/07/2024 467 PASCON 190.06 0.00 0 90
418 PURBA BARDHAMAN Mangolkote Burdwan Division PURBA GOPALPUR PIPED WATER SUPPLY SCHEME , SM/14448 New Material Requisition To Resource Division RTOR000109/2023-2024 1965/BWD 26/04/2023 Resource Division 35.89 0.00 0 0
419 PURBA BARDHAMAN Mangolkote Burdwan Division PURBA GOPALPUR PIPED WATER SUPPLY SCHEME , SM/14448 New Material Requisition To Resource Division RTOR000181/2023-2024 2155/BWD 10/05/2023 Resource Division 17.80 0.00 0 0
420 PURBA BARDHAMAN Mangolkote Central Mechanical PURBA GOPALPUR PIPED WATER SUPPLY SCHEME , SM/14448 New New service connection charges for Purba Gopalpur PWSS TW-1 BILL/01416/2023-2024 BP-2023-24-144 31/08/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 4.20 0.00 0 0
421 PURBA BARDHAMAN Mangolkote Burdwan Division PURBA GOPALPUR PIPED WATER SUPPLY SCHEME , SM/14448 New Material Requisition To Resource Division RTOR000729/2023-2024 5263/BWD 30/11/2023 Resource Division 20.78 0.00 0 0
422 PURBA BARDHAMAN Mangolkote Central Mechanical PURBA GOPALPUR PIPED WATER SUPPLY SCHEME , SM/14448 New New service connection charges for Purba Gopalpur PWSS TW-2 BILL/01769/2023-2024 BP-2023-24-274 21/12/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.51 0.00 0 0
423 PURBA BARDHAMAN Mangolkote Central Mechanical PURBA GOPALPUR PIPED WATER SUPPLY SCHEME , SM/14448 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Jabagram & others water supply scheme under Mangalkote Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. Driller In-Charge Junior Engineer ORD/000118/2024-2025 2590/CMD 27/08/2024 90 M/S SAJAHAN CHOWDHURY 62.06 0.00 0 0
424 PURBA BARDHAMAN Mangolkote Burdwan Division PURBA GOPALPUR PIPED WATER SUPPLY SCHEME , SM/14448 New PURBA GOPALPUR Piped Water Supply Scheme with sinking of Tube-well, LDS, Rising Main, FHTC, Construction of 300 cum capacity RCC OHR with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drain and internal pathway at different TW site under MANGLAKOTE Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer JUNIOR ENGINEER KATWA SUB-DIVISION PHE DTE ORD/000020/2023-2024 1751/BWD 13/04/2023 841 BRAHMA CONSTRUCTION COMPANY 429.79 48.49 11.28 30
425 PURBA BARDHAMAN Mangolkote Burdwan Division PURBA GOPALPUR PIPED WATER SUPPLY SCHEME , SM/14448 New Constn. of pump house, Plinth Protection for Pump House & OHR, extension of pipeline for providing FHTC at MURULIA village, Adivasi para, approach road for 2nd Pump house of PURBA GOPALPUR PWSS Under Katwa Sub Division, Block- Mongolkote, Burdwan Division PHE Dte. Assistant Engineer ORD/001124/2024-2025 496/BWD 28/01/2025 90 MONDAL ENTERPRISE 26.97 0.00 0 0
426 PURBA BARDHAMAN Mangolkote Central Mechanical PURBA GOPALPUR PIPED WATER SUPPLY SCHEME , SM/14448 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at PURBA GOPALPUR Water Supply Scheme [ Block- MONGOLKOTE] under CMD, PHE Dte., Dist.- Purba-Bardhaman. Driller In-Charge Junior Engineer ORD/000560/2023-2024 3873/CMD 17/08/2023 363 UNIVERSAL ENTERPRISES 29.94 0.00 0 90
427 PURBA BARDHAMAN Burdwan - I Burdwan Division KASHIARA PIPED WATER SUPPLY SCHEME , SM/14075 New Material Requisition To Resource Division RTOR000098/2023-2024 1962/BWD 25/04/2023 Resource Division 1.83 0.00 0 0
428 PURBA BARDHAMAN Burdwan - I Burdwan Division KASHIARA PIPED WATER SUPPLY SCHEME , SM/14075 New Material Requisition To Resource Division RTOR000317/2023-2024 2197/BWD 12/05/2023 Resource Division 7.97 0.00 0 0
429 PURBA BARDHAMAN Burdwan - I Burdwan Division KASHIARA PIPED WATER SUPPLY SCHEME , SM/14075 New Material Requisition To Resource Division RTOR000722/2023-2024 5265/BWD 30/11/2023 Resource Division 21.07 0.00 0 0
430 PURBA BARDHAMAN Burdwan - I Central Mechanical KASHIARA PIPED WATER SUPPLY SCHEME , SM/14075 New New service connection for Kashiara W/S Scheme. BILL/02189/2023-2024 BP-2023-24-384 16/01/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 2.91 0.00 0 0
431 PURBA BARDHAMAN Burdwan - I Central Mechanical KASHIARA PIPED WATER SUPPLY SCHEME , SM/14075 New New service connection charges for Kashiara PWSS TW-2 BILL/02207/2023-2024 BP-2023-24-398 17/01/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.22 0.00 0 0
432 PURBA BARDHAMAN Burdwan - I Burdwan Division KASHIARA PIPED WATER SUPPLY SCHEME , SM/14075 New Sinking of Tube-wells, LDS, Rising Main, FHTC, Construction of 350 cum capacity RCC OHR with 20.0 mtr. with Staging height including soil investigation, construction of switch room, boundary walls with gates, land development, surface drains and internal pathways at different TW site for KASHIARA Piped Water Supply Scheme under BURDWAN I Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000480/2023-2024 256/BWD 09/08/2023 365 PUSPA ENTERPRISE 597.52 62.64 10.48 40
433 PURBA BARDHAMAN Burdwan - I Central Mechanical KASHIARA PIPED WATER SUPPLY SCHEME , SM/14075 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at Kashiara Water Supply Scheme [ Block- Burdwan-1 ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER Junior Engineer ORD/000656/2023-2024 3999/CMD 29/08/2023 30 MENAKA ENTERPRISE. 28.98 0.00 0 90
434 PURBA BARDHAMAN Burdwan - I Central Mechanical KASHIARA PIPED WATER SUPPLY SCHEME , SM/14075 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at MALKITA & others water supply scheme under Bardhaman-I Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman ASSISTANT ENGINEER Junior Engineer ORD/000066/2024-2025 2388/CMD 02/08/2024 90 ELECTRICAL & MECHANICAL ENGINEERING CORPORATION 55.95 0.00 0 0
435 PURBA BARDHAMAN Burdwan - I Burdwan Division KASHIARA PIPED WATER SUPPLY SCHEME , SM/14075 New Material Requisition To Resource Division RTOR000090/2024-2025 416/BWD 17/01/2025 Resource Division 8.18 0.00 0 0
436 PURBA BARDHAMAN Ausgram - II Burdwan Division CHHORA PIPED WATER SUPPLY SCHEME , SM/13328 New Material Requisition To Resource Division RTOR000083/2022-2023 1268/BWD 17/03/2023 Resource Division 16.43 0.00 0 0
437 PURBA BARDHAMAN Ausgram - II Burdwan Division CHHORA PIPED WATER SUPPLY SCHEME , SM/13328 New Material Requisition To Resource Division RTOR000095/2022-2023 1644/BWD 06/04/2023 Resource Division 43.68 0.00 0 0
438 PURBA BARDHAMAN Ausgram - II Central Mechanical CHHORA PIPED WATER SUPPLY SCHEME , SM/13328 New New service connection charges of Chhora PWSS TW-2 BILL/00747/2023-2024 BP-2023-24-47 13/07/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 5.44 0.00 0 0
439 PURBA BARDHAMAN Ausgram - II Central Mechanical CHHORA PIPED WATER SUPPLY SCHEME , SM/13328 New New service connection charges of Chhora PWSS TW-1 BILL/00746/2023-2024 BP-2023-24-48 13/07/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 6.21 0.00 0 0
440 PURBA BARDHAMAN Ausgram - II Burdwan Division CHHORA PIPED WATER SUPPLY SCHEME , SM/13328 New Material Requisition To Resource Division RTOR000639/2023-2024 5105/BWD 23/11/2023 Resource Division 24.22 0.00 0 0
441 PURBA BARDHAMAN Ausgram - II Durgapur W/S Division CHHORA PIPED WATER SUPPLY SCHEME , SM/13328 New Acceptance cum Formal Work Order work of Balance work for renovation and modification of administrative office building at PHE Complex 2nd Floor, Nababhat, P.O- Fagupur, Dist- Purba Bardhaman inconnection with Augmentation of Chhora PWSS under Aushgram-II Block. Assistant Engineer-I JUNIOR ENGINEER-2 ORD/000301/2023-2024 364/DWSD 15/03/2024 30 SANDIPAN SENGUPTA 9.60 0.00 0 100
442 PURBA BARDHAMAN Ausgram - II Central Mechanical CHHORA PIPED WATER SUPPLY SCHEME , SM/13328 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at CHHORA Water Supply Scheme [ Block- AUSGRAM-2 ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. Driller In-Charge JUNIOR ENGINEER ORD/000054/2023-2024 2514/CMD 02/06/2023 30 MITRA ENTERPRISE 29.43 5.81 19.74 45
443 PURBA BARDHAMAN Ausgram - II Central Mechanical CHHORA PIPED WATER SUPPLY SCHEME , SM/13328 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Chora, Kalaijhuti & others water supply scheme under Ausgram-2 Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. Driller In-Charge JUNIOR ENGINEER ORD/000143/2024-2025 2405/CMD 02/08/2024 90 NABAUDYOG ELECTRICAL ENGINEERING CO-OPERATIVE SOCIETY LTD 95.26 0.00 0 0
444 PURBA BARDHAMAN Ausgram - II Durgapur W/S Division CHHORA PIPED WATER SUPPLY SCHEME , SM/13328 New Hiring of LUXURY Diesel Ambassador Car (Inspection Vehicle) for using of the Assistant Engineer-II under office of the Executive Engineer, Durgapur Water Supply Division, Public Health Engineering Dte at Fagupur, Nababhat, Purba Bardhaman for the period of 01.03.2024 to 31.08.2024 (6 Months)(Sl-02) Assistant Engineer-I,Assistant Engineer-II JUNIOR ENGINEER-1,JUNIOR ENGINEER-2,Junior Engineer_3 ORD/000295/2023-2024 268/DWSD 29/02/2024 6 PRAMIT CHATTERJEE 0.82 0.00 0 0
445 PURBA BARDHAMAN Ausgram - II Durgapur W/S Division CHHORA PIPED WATER SUPPLY SCHEME , SM/13328 New Acceptance cum Formal Work Order for Sinking of 300 X 200mm dia Tube Well- 300 mtr.& 2 nos Trial Bore of 200 X 200mm dia Tube Well- 300 mtr at Pubar village under Chhora PWSS (JJM) Block - Ausgram -II, District:- Purba-Bardhaman, under Durgapur W/S Division , PHE Dte. Assistant Engineer-II JUNIOR ENGINEER-2 ORD/000169/2024-2025 1612/DWSD 26/11/2024 60 KAR CONSTRUCTION AND ORDER SUPPLIERS 34.01 0.00 0 0
446 PURBA BARDHAMAN Ausgram - II Durgapur W/S Division CHHORA PIPED WATER SUPPLY SCHEME , SM/13328 New Material Requisition To Resource Division RTOR000011/2024-2025 1724/H/DWSD 10/12/2024 Resource Division 7.83 0.00 0 0
447 PURBA BARDHAMAN Ausgram - II Burdwan Division CHHORA PIPED WATER SUPPLY SCHEME , SM/13328 New Different works related (sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of different capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site) to KHANDARI & CHHORA Piped Water Supply Scheme under Ausgram II Block, District:- Purba Bardhaman [NEW SCHEME] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer2, Durgapur Sub-Division, PHE Dte. ORD/000735/2022-2023 1005/BWD 06/03/2023 696 M/S NATIONAL CONSTRUCTION 1,331.54 239.99 18.02 100
448 PURBA BARDHAMAN Ausgram - II Durgapur W/S Division CHHORA PIPED WATER SUPPLY SCHEME , SM/13328 New Continuation order for Hiring of Luxury Diesel Ambassador Car use for Inspection Vehicle of JJM under Office of the Executive Engineer, Durgapur W/S Division, Public Health Engineering Dte at Fagurpur, Nababhat, Purba Bardhaman for the period from 01.03.2025 to 31.05.2025 (3 Months). Assistant Engineer-II JUNIOR ENGINEER-2 ORD/000281/2024-2025 341/DWSD 27/02/2025 90 PRAMIT CHATTERJEE 0.41 0.00 0 0
449 PURBA BARDHAMAN Ausgram - II Durgapur W/S Division CHHORA PIPED WATER SUPPLY SCHEME , SM/13328 New FORMAL WORK ORDER FOR Balance and additional works for sinking of 300X200 mm dia X 210 mtr deapth RRM Tube well and laying pipe line (LDS),FHTC, Construction of Switch Room,Pump House,Inter Connection along with road restoration and construction of Boundary wall for head worksites and other allieds work related to JJM (7 Nos PWSS) i.e. Aushgram PWSS, Jalkandar and Bhuyera PWSS, Karatia PWSS, Khandari PWSS, Pichkuri PWSS, Shibda PWSS under Aushgram-I and II,Galsi-I and II Block under DURGAPUR W/S DIVISION,PHE Dte. Assistant Engineer-I,Assistant Engineer-II Contractual Junior Engineer_1,Contractual Junior Engineer_2,Contractual Junior Engineer_3,Contractual Junior Engineer_4,Contractual Junior Engineer_5,JUNIOR ENGINEER-1,JUNIOR ENGINEER-2,Junior Engineer_3 ORD/000286/2024-2025 493/DWSD 19/03/2025 185 MANASH GHOSH 745.87 0.00 0 0
450 PURBA BARDHAMAN Ausgram - II Durgapur W/S Division CHHORA PIPED WATER SUPPLY SCHEME , SM/13328 New Material Requisition To Resource Division RTOR000030/2024-2025 448/DWSD 17/03/2025 Resource Division 0.14 0.00 0 0
451 PURBA BARDHAMAN Ausgram - II Durgapur W/S Division CHHORA PIPED WATER SUPPLY SCHEME , SM/13328 New Continuation order for Hiring of LUXURY Diesel Ambassador Car (Inspection Vehicle) for using of the Assistant Engineer-II under office of the Executive Engineer, Durgapur Water Supply Division, Public Health Engineering Dte at Fagupur, Nababhat, Purba Bardhaman for the period of 01.09.2024 to 28.02.2025 (6 Months)(Sl-02) Assistant Engineer-II JUNIOR ENGINEER-2 ORD/000139/2024-2025 1249/DWSD 30/08/2024 180 PRAMIT CHATTERJEE 0.82 0.80 97.56 20
452 PURBA BARDHAMAN Ausgram - I Burdwan Division PICHKURI PIPED WATER SUPPLY SCHEME , SM/13330 New Material Requisition To Resource Division RTOR000031/2023-2024 1962/BWD 25/04/2023 Resource Division 25.71 0.00 0 0
453 PURBA BARDHAMAN Ausgram - I Burdwan Division PICHKURI PIPED WATER SUPPLY SCHEME , SM/13330 New Material Requisition To Resource Division RTOR000189/2023-2024 2155/BWD 10/05/2023 Resource Division 11.16 0.00 0 0
454 PURBA BARDHAMAN Ausgram - I Central Mechanical PICHKURI PIPED WATER SUPPLY SCHEME , SM/13330 New New service connection charges for Pichkuri PWSS TW-2 BILL/00763/2023-2024 BP-2023-24-65 18/07/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 2.26 0.00 0 0
455 PURBA BARDHAMAN Ausgram - I Central Mechanical PICHKURI PIPED WATER SUPPLY SCHEME , SM/13330 New New service connection charges for Pichkuri PWSS TW-1 BILL/00762/2023-2024 BP-2023-24-64 18/07/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.96 0.00 0 0
456 PURBA BARDHAMAN Ausgram - I Burdwan Division PICHKURI PIPED WATER SUPPLY SCHEME , SM/13330 New Material Requisition To Resource Division RTOR000602/2023-2024 4908/BWD 10/11/2023 Resource Division 12.03 0.00 0 0
457 PURBA BARDHAMAN Ausgram - I Burdwan Division PICHKURI PIPED WATER SUPPLY SCHEME , SM/13330 New Continuation order for Supply of 01(one) No. Diesel Driven Motor Cab (Bharat Stage-II) on hire basis for the office of the Assistant Engineer, Durgapur Sub-Division (Burdwan North) P.H.E. Dte. Govt. of West Bengal (for the period of 01/01/2024 to 31/05/2024) Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer1, Durgapur Sub-Division, PHE Dte. ORD/001180/2023-2024 995/DSD 29/12/2023 183 SUJAUDDIN SEKH 2.00 0.00 0 60
458 PURBA BARDHAMAN Ausgram - I Burdwan Division PICHKURI PIPED WATER SUPPLY SCHEME , SM/13330 New PICHKURI Piped Water Supply Scheme with sinking of Tube-well, LDS, Rising Main, FHTC, Construction of 250 cum capacity RCC OHR with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drain and internal pathway at different TW site under Ausgram-I Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer1, Durgapur Sub-Division, PHE Dte. ORD/000064/2023-2024 1985/BWD 27/04/2023 365 BANSBERIA CONSTRUCTION CO. 445.01 159.90 35.93 90
459 PURBA BARDHAMAN Ausgram - I Central Mechanical PICHKURI PIPED WATER SUPPLY SCHEME , SM/13330 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at Pichkuri Water Supply Scheme [ Block- Ausgram-1 ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. Driller In-Charge JUNIOR ENGINEER ORD/000150/2023-2024 2886/CMD 10/07/2023 30 CHATTERJEE ENTERPRISE 27.75 10.54 37.98 98
460 PURBA BARDHAMAN Ausgram - I Burdwan Division PICHKURI PIPED WATER SUPPLY SCHEME , SM/13330 New Continuation work order for supply of 01 (one) No. Diesel driven Motor Cab (Bharat Stage-III) on hire basis for the office of the Assistant Engineer, Durgapur Sub-Divison(Burdwan North), P.H.E. DTE. Govt. of West Bengal (for the period of 01/06/2024 to 31/07/2024) Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer1, Durgapur Sub-Division, PHE Dte. ORD/000184/2024-2025 411/DSD 28/05/2024 61 SUJAUDDIN SEKH 0.80 0.00 0 0
461 PURBA BARDHAMAN Ausgram - I Central Mechanical PICHKURI PIPED WATER SUPPLY SCHEME , SM/13330 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Pichkuri, karatia & others water supply scheme under Ausgram-1 Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman Driller In-Charge JUNIOR ENGINEER ORD/000398/2024-2025 2764/CMD 26/09/2024 90 JAL PRAVAHIKA PVT LTD 52.55 0.00 0 0
462 PURBA BARDHAMAN Ausgram - I Durgapur W/S Division PICHKURI PIPED WATER SUPPLY SCHEME , SM/13330 New FORMAL WORK ORDER FOR Balance and additional works for sinking of 300X200 mm dia X 210 mtr deapth RRM Tube well and laying pipe line (LDS),FHTC, Construction of Switch Room,Pump House,Inter Connection along with road restoration and construction of Boundary wall for head worksites and other allieds work related to JJM (7 Nos PWSS) i.e. Aushgram PWSS, Jalkandar and Bhuyera PWSS, Karatia PWSS, Khandari PWSS, Pichkuri PWSS, Shibda PWSS under Aushgram-I and II,Galsi-I and II Block under DURGAPUR W/S DIVISION,PHE Dte. Assistant Engineer-I,Assistant Engineer-II Contractual Junior Engineer_1,Contractual Junior Engineer_2,Contractual Junior Engineer_3,Contractual Junior Engineer_4,Contractual Junior Engineer_5,JUNIOR ENGINEER-1,JUNIOR ENGINEER-2,Junior Engineer_3 ORD/000286/2024-2025 493/DWSD 19/03/2025 185 MANASH GHOSH 745.87 0.00 0 0
463 PURBA BARDHAMAN Ausgram - I Durgapur W/S Division PICHKURI PIPED WATER SUPPLY SCHEME , SM/13330 New Material Requisition To Resource Division RTOR000059/2024-2025 479/DWSD 17/03/2025 Resource Division 0.14 0.00 0 0
464 PURBA BARDHAMAN Burdwan - II Burdwan Division Samanti Piped Water Supply Scheme , SM/13319 New Material Requisition To Resource Division RTOR000015/2023-2024 1962/BWD 25/04/2023 Resource Division 10.45 0.00 0 0
465 PURBA BARDHAMAN Burdwan - II Burdwan Division Samanti Piped Water Supply Scheme , SM/13319 New Material Requisition To Resource Division RTOR000170/2023-2024 2155/BWD 10/05/2023 Resource Division 23.19 0.00 0 0
466 PURBA BARDHAMAN Burdwan - II Central Mechanical Samanti Piped Water Supply Scheme , SM/13319 New New service connection charges for Samanti PWSS TW-1 BILL/00886/2023-2024 BP-2023-24-112 10/08/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 4.10 0.00 0 0
467 PURBA BARDHAMAN Burdwan - II Burdwan Division Samanti Piped Water Supply Scheme , SM/13319 New Material Requisition To Resource Division RTOR000732/2023-2024 5237/BWD 30/11/2023 Resource Division 21.07 0.00 0 0
468 PURBA BARDHAMAN Burdwan - II Burdwan Division Samanti Piped Water Supply Scheme , SM/13319 New Supply & delivery of different dia. MJ Coller for FHTC as well as smooth running of different W/S. Schemes under Burdwan Division, P.H.E. Dte. [i.e. (1) Magra PWSS, Memari-I Block, (2) Kuchut PWSS, Memari - II Block, (3) Khundkuri PWSS, Khandaghosh Block & (4) Samanti PWSS, Burdwan - II Block)] ORD/000653/2023-2024 4076/BWD 13/09/2023 20 SSPR VALVE MANUFACTURING PVT LTD. 20.63 0.00 0 100
469 PURBA BARDHAMAN Burdwan - II Central Mechanical Samanti Piped Water Supply Scheme , SM/13319 New New service connection for Samanti W/S scheme TW No-2 BILL/02273/2023-2024 BP-2023-24-411 19/01/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 6.60 0.00 0 0
470 PURBA BARDHAMAN Burdwan - II Burdwan Division Samanti Piped Water Supply Scheme , SM/13319 New Restoration of hard shouldering and flank damaged during laying of PHE pipeline at Samanti village road from 0.00 Kmp to 3.00 Kmp within Samanti PWSS. BILL/00138/2024-2025 226/JJM 14/05/2024 EXECUTIVE ENGINEER-I, BURDWAN DIVISION, P.W.D. 5.08 0.00 0 0
471 PURBA BARDHAMAN Burdwan - II Central Mechanical Samanti Piped Water Supply Scheme , SM/13319 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at KUSHA & others water supply scheme under Bardhaman-II Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman ASSISTANT ENGINEER Junior Engineer ORD/000065/2024-2025 2389/CMD 02/08/2024 90 DILIP MAHATO 53.14 0.00 0 0
472 PURBA BARDHAMAN Burdwan - II Central Mechanical Samanti Piped Water Supply Scheme , SM/13319 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at Samanti Water Supply Scheme [ Block- Burdwan-2 ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER Junior Engineer ORD/000194/2023-2024 2979/CMD 18/07/2023 30 MS DAS ELECTRIC CO 28.98 0.00 0 95
473 PURBA BARDHAMAN Burdwan - II Burdwan Division Samanti Piped Water Supply Scheme , SM/13319 New SAMANTI Piped Water Supply Scheme with sinking of Tube-well, LDS, Rising Main, FHTC, Construction of 250 cum capacity RCC OHR with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drain and internal pathway at different TW site under BARDHAMAN-II Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. Junior Engineer, Burdwan Sadar Sub-Division ORD/000802/2022-2023 1536/BWD 29/03/2023 365 G.B. CONSTRUCTION & CO. 504.69 172.85 34.25 36
474 PURBA BARDHAMAN Memari - II Burdwan Division BAMUNPUKUR PIPED WATER SUPPLY SCHEME , SM/14930 New Material Requisition To Resource Division RTOR000227/2023-2024 2155/BWD 10/05/2023 Resource Division 8.19 0.00 0 0
475 PURBA BARDHAMAN Memari - II Burdwan Division BAMUNPUKUR PIPED WATER SUPPLY SCHEME , SM/14930 New Material Requisition To Resource Division RTOR000545/2023-2024 4299/BWD 29/09/2023 Resource Division 9.65 0.00 0 0
476 PURBA BARDHAMAN Memari - II Burdwan Division BAMUNPUKUR PIPED WATER SUPPLY SCHEME , SM/14930 New Material Requisition To Resource Division RTOR000650/2023-2024 5112/BWD 23/11/2023 Resource Division 20.46 0.00 0 0
477 PURBA BARDHAMAN Memari - II Central Mechanical BAMUNPUKUR PIPED WATER SUPPLY SCHEME , SM/14930 New New service connection for Bamunpukur PWSS of PH-1 BILL/02352/2023-2024 BP-2023-24-471 31/01/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 8.81 0.00 0 0
478 PURBA BARDHAMAN Memari - II Central Mechanical BAMUNPUKUR PIPED WATER SUPPLY SCHEME , SM/14930 New New service connection for Bamunpukur PWSS TW 1. BILL/02439/2023-2024 BP-2023-24-524 09/02/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 2.99 0.00 0 0
479 PURBA BARDHAMAN Memari - II Burdwan Division BAMUNPUKUR PIPED WATER SUPPLY SCHEME , SM/14930 New Continuation order for "Supply of one No. Diesel Driven Ambassador Car on hire basis for the office of the Assistant Engineer, Burdwan Sub-Division, PHE Dte for the period of 01.12.2023 to 31.05.2024 Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/001007/2023-2024 2751/BSD 28/11/2023 183 SK.ASFIA 2.40 0.00 0 70
480 PURBA BARDHAMAN Memari - II Burdwan Division BAMUNPUKUR PIPED WATER SUPPLY SCHEME , SM/14930 New BAMUNPUKUR Piped Water Supply Scheme with sinking of Tube-well, LDS, Rising Main, FHTC, Construction of 300 cum capacity RCC OHR with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drain and internal pathway at different TW site under Memari-II Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER RWS BURDWAN SUB-DIVISION PHE DTE ORD/000112/2023-2024 2301/BWD 19/05/2023 365 MLG CONSTRUCTION 447.89 0.00 0 40
481 PURBA BARDHAMAN Memari - II Central Mechanical BAMUNPUKUR PIPED WATER SUPPLY SCHEME , SM/14930 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at NOAHATI & others water supply scheme under Memari-II Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. ASSISTANT ENGINEER Junior Engineer ORD/000102/2024-2025 2395/CMD 02/08/2024 90 S.G. TECHNICAL SERVICES 36.99 0.00 0 0
482 PURBA BARDHAMAN Memari - II Central Mechanical BAMUNPUKUR PIPED WATER SUPPLY SCHEME , SM/14930 New Quotation for new service connection at Bamunpukur PWSS TW-2. BILL/00932/2024-2025 BP-2024-25-349 05/10/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 5.45 0.00 0 0
483 PURBA BARDHAMAN Memari - II Burdwan Division BAMUNPUKUR PIPED WATER SUPPLY SCHEME , SM/14930 New Restoration Work of damage portion of the RIDF road from Bilbari to Farakpur for PHE pipe laying work within MEMARI-II BLOCK IN THE DISTRICT OF PURBABARDHAMAN BILL/00978/2024-2025 1052/JJM 13/11/2024 EXECUTIVE ENGINEER (WBSRDA) PURBA BARDHAMAN DIVISION 23.03 0.00 0 null
484 PURBA BARDHAMAN Memari - II Burdwan Division BAMUNPUKUR PIPED WATER SUPPLY SCHEME , SM/14930 New Material Requisition To Resource Division RTOR000086/2024-2025 412/BWD 17/01/2025 Resource Division 5.13 0.00 0 0
485 PURBA BARDHAMAN Memari - II Burdwan Division BAMUNPUKUR PIPED WATER SUPPLY SCHEME , SM/14930 New Continuation Work Order for supply of inspection Vehicle No. WB42Y- 7403 for inspection of different JJM related(schemes) works as and when required including supply of driver & fuel(minimum 8 hours duty per day) and all taxes etc. for Burdwan Sub Division under Burdwan Division, PHE Dte consider 96.00 Km. run per day (Period from 01-02-2025 to 30-04-2025) JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/001402/2024-2025 240/BSD 31/01/2025 66 PARVIN BEGAM 0.85 0.00 0 0
486 PURBA BARDHAMAN Memari - II Central Mechanical BAMUNPUKUR PIPED WATER SUPPLY SCHEME , SM/14930 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at Bamunpukur Water Supply Scheme [ Block- Memari-2 ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER Junior Engineer ORD/000710/2023-2024 4021/CMD 29/08/2023 703 DUTTA ENTERPRISE 29.38 0.00 0 50
487 PURBA BARDHAMAN Raina - I Burdwan Division MACHKHARA PIPED WATER SUPPLY SCHEME , SM/14967 New Material Requisition To Resource Division RTOR000335/2023-2024 2197/BWD 12/05/2023 Resource Division 13.92 0.00 0 0
488 PURBA BARDHAMAN Raina - I Burdwan Division MACHKHARA PIPED WATER SUPPLY SCHEME , SM/14967 New Material Requisition To Resource Division RTOR000536/2023-2024 4296/BWD 29/09/2023 Resource Division 5.11 0.00 0 0
489 PURBA BARDHAMAN Raina - I Burdwan Division MACHKHARA PIPED WATER SUPPLY SCHEME , SM/14967 New Material Requisition To Resource Division RTOR000675/2023-2024 5063/BWD 23/11/2023 Resource Division 20.46 0.00 0 0
490 PURBA BARDHAMAN Raina - I Central Mechanical MACHKHARA PIPED WATER SUPPLY SCHEME , SM/14967 New New service connection for Machkhanda PWSS. BILL/02247/2023-2024 BP-2023-24-399 17/01/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 5.37 0.00 0 0
491 PURBA BARDHAMAN Raina - I Central Mechanical MACHKHARA PIPED WATER SUPPLY SCHEME , SM/14967 New New service connection for Mackhara PWSS TW-2. BILL/02280/2023-2024 BP-2023-24-434 29/01/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 4.50 0.00 0 0
492 PURBA BARDHAMAN Raina - I Central Mechanical MACHKHARA PIPED WATER SUPPLY SCHEME , SM/14967 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Bajitpur, Belsar & other water supply scheme under Raina-1 Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000117/2024-2025 2589/CMD 27/08/2024 90 DEY ENTERPRISE 74.58 0.00 0 0
493 PURBA BARDHAMAN Raina - I Burdwan Division MACHKHARA PIPED WATER SUPPLY SCHEME , SM/14967 New Different works related (sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of different capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site) to BHAGABATIPUR, MACHKHARA & UDGARA Piped Water Supply Scheme under Raina ¿ I Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000690/2023-2024 4386/BWD 05/10/2023 365 SK ALIM 1,378.97 0.00 0 55
494 PURBA BARDHAMAN Raina - I Burdwan Division MACHKHARA PIPED WATER SUPPLY SCHEME , SM/14967 New Balance work [i.e. Extension or parallel Pipeline, Leftout FHTC, Road Restoration work, Sinking of Additional Tube Well with Pump House & Boundary wall, inter Connection of Additional Tube Well, Construction of M.S.Structural bridge, canal Crossing, MS casing with allied work of Bhagabatipur, Machkhara, Udgara, Bantir, Chakpurohit Rasuikhanda, Sankarpur, Gopalpur & Belshar PWSS Block-RAINA- I under Burdwan Sub Division, PHE Dte. within Burdwan Division PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/001103/2024-2025 469/BWD 24/01/2025 180 SK ALIM 1,353.91 0.00 0 0
495 PURBA BARDHAMAN Raina - I Central Mechanical MACHKHARA PIPED WATER SUPPLY SCHEME , SM/14967 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at Machkhara Water Supply Scheme [ Block- Raina-1 ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000709/2023-2024 4020/CMD 29/08/2023 598 CHOUDHURY ENTERPRISE 28.98 0.00 0 85
496 PURBA BARDHAMAN Mangolkote Burdwan Division DEULIA PIPED WATER SUPPLY SCHEME , SM/14973 New Material Requisition To Resource Division RTOR000242/2023-2024 2197/BWD 12/05/2023 Resource Division 7.44 0.00 0 0
497 PURBA BARDHAMAN Mangolkote Burdwan Division DEULIA PIPED WATER SUPPLY SCHEME , SM/14973 New Material Requisition To Resource Division RTOR000457/2023-2024 3981/BWD 08/09/2023 Resource Division 44.04 0.00 0 0
498 PURBA BARDHAMAN Mangolkote Burdwan Division DEULIA PIPED WATER SUPPLY SCHEME , SM/14973 New Material Requisition To Resource Division RTOR000665/2023-2024 5086/BWD 23/11/2023 Resource Division 20.46 0.00 0 0
499 PURBA BARDHAMAN Mangolkote Burdwan Division DEULIA PIPED WATER SUPPLY SCHEME , SM/14973 New Supply of 1 (one) No. Inspection Vehicle for different JJM Related Works as and when required including supply of driver and fuels (Minimum 8 Hours of duty) under Katwa Sub-Division within Burdwan Division, P.H.E. Dte. Consider 96.00 Km run per Day. Assistant Engineer JUNIOR ENGINEER KATWA SUB-DIVISION PHE DTE ORD/001080/2023-2024 22/KTS 05/01/2024 70 AJIT SAMANTA 0.90 0.00 0 100
500 PURBA BARDHAMAN Mangolkote Central Mechanical DEULIA PIPED WATER SUPPLY SCHEME , SM/14973 New QUOTATION FOR NEW SERVICE CONNECTION AT DEULIA PWSS TW-1 BILL/00368/2024-2025 BP-2024-25-189 08/07/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 4.69 0.00 0 0
501 PURBA BARDHAMAN Mangolkote Central Mechanical DEULIA PIPED WATER SUPPLY SCHEME , SM/14973 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Jabagram & others water supply scheme under Mangalkote Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. Driller In-Charge Junior Engineer ORD/000118/2024-2025 2590/CMD 27/08/2024 90 M/S SAJAHAN CHOWDHURY 62.06 0.00 0 0
502 PURBA BARDHAMAN Mangolkote Central Mechanical DEULIA PIPED WATER SUPPLY SCHEME , SM/14973 New Quotation for new service connection at Deulia PWSS TW-2. BILL/01188/2024-2025 BP-2024-25-410 11/12/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 8.52 0.00 0 0
503 PURBA BARDHAMAN Mangolkote Burdwan Division DEULIA PIPED WATER SUPPLY SCHEME , SM/14973 New Different works related (sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of different capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site) to DEULIA, GOBARDHANPUR, KHARIJA-KASHIGRAM & UNIATATARPUR Piped Water Supply Scheme under Mangolkote Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer JUNIOR ENGINEER KATWA SUB-DIVISION PHE DTE ORD/000477/2023-2024 3491/BWD 09/08/2023 815 POWER TOOLS & ENGINEERING 1,741.05 0.00 0 10
504 PURBA BARDHAMAN Mangolkote Central Mechanical DEULIA PIPED WATER SUPPLY SCHEME , SM/14973 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at DEULIA Water Supply Scheme [ Block- MONGOLKOTE] under CMD, PHE Dte., Dist.- Purba-Bardhaman. Driller In-Charge Junior Engineer ORD/000821/2023-2024 4098/CMD 29/08/2023 640 CHOUDHURY ENTERPRISE 28.94 0.00 0 43
505 PURBA BARDHAMAN Mangolkote Burdwan Division DEULIA PIPED WATER SUPPLY SCHEME , SM/14973 New Material Requisition To Resource Division RTOR000089/2024-2025 415/BWD 17/01/2025 Resource Division 1.83 0.00 0 0
506 PURBA BARDHAMAN Mangolkote Burdwan Division DEULIA PIPED WATER SUPPLY SCHEME , SM/14973 New Balance works for different type of works in connection with Jaggeswardihi PWSS, Deulia PWSS, Kunda PWSS and Gohagram PWSS Under Mongalkote Block within Katwa Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer ORD/001186/2024-2025 593/BWD 07/02/2025 120 MD HASIN 203.38 0.00 0 0
507 PURBA BARDHAMAN Jamalpur Burdwan Division GOPALPUR PIPED WATER SUPPLY SCHEME , SM/15583 New Material Requisition To Resource Division RTOR000268/2023-2024 2197/BWD 12/05/2023 Resource Division 17.02 0.00 0 0
508 PURBA BARDHAMAN Jamalpur Central Mechanical GOPALPUR PIPED WATER SUPPLY SCHEME , SM/15583 New New service connection for Gopalpur PWSS TW-1. BILL/02282/2023-2024 BP-2023-24-433 29/01/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 4.00 0.00 0 0
509 PURBA BARDHAMAN Jamalpur Central Mechanical GOPALPUR PIPED WATER SUPPLY SCHEME , SM/15583 New New Service connection at GOPALPUR PWSS TW-2. BILL/02363/2023-2024 BP-2023-24-483 31/01/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 13.65 0.00 0 0
510 PURBA BARDHAMAN Jamalpur Burdwan Division GOPALPUR PIPED WATER SUPPLY SCHEME , SM/15583 New Route Survey & Preparation of DPR for GOPALPUR W/S Scheme under Burdwan-I Block under Burdwan Sub- Division under Burdwan Division PHE Dte. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000846/2024-2025 2584/BSD 26/11/2024 45 APEX ENGINEERING 2.71 0.00 0 0
511 PURBA BARDHAMAN Jamalpur Central Mechanical GOPALPUR PIPED WATER SUPPLY SCHEME , SM/15583 New Supply & Installation of Submersible Pumping Machinery , Voltage Stabilizer, Chlorination System and Internal House wiring for Tube well no.- 1 & 2 at GOPALPUR Water Supply Scheme [Block-JAMALPUR] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000904/2023-2024 4168/CMD 29/08/2023 546 SOUNAK ENTERPRISE 22.10 0.00 0 100
512 PURBA BARDHAMAN Jamalpur Burdwan Division GOPALPUR PIPED WATER SUPPLY SCHEME , SM/15583 New GOPALPUR Piped Water Supply Scheme with sinking of Tube-well, LDS, Rising Main, FHTC, construction of switch rooms & boundary walls with gates and land development, drain and internal pathway at different TW site under Jamalpur Block, District:- Purba-Bardhaman [NEW SCHEME] AE(HQs) Junior Engineer, Burdwan Division ORD/000121/2023-2024 2305/BWD 19/05/2023 757 IJABUL SEKH 266.75 0.00 0 100
513 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Jaugram piped Water Supply Scheme at Jamalpur Block under Burdwan Division PHE. DTE. , SM/09104 Retrofitting Extension of pipeline for providing functional house hold tap connection at Jougram village of Jougram piped water supply scheme within Burdwan Sub-Division under Burdwan Division, PHE Dte..Gr.A. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000311/2021-2022 1033/BSD 05/08/2021 30 N.S. ENTERPRISE 0.69 0.67 97.1 1
514 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Jaugram piped Water Supply Scheme at Jamalpur Block under Burdwan Division PHE. DTE. , SM/09104 Retrofitting Continuation work order for Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Jougram village (Jougram habitation) of Jougram Piped Water Supply Scheme within Burdwan Sub-Divn. under Burdwan Division, PHE. Dte. (Part-C) [SL. No. : 11] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000031/2021-2022 3408/BWD 25/06/2021 15 N.S. ENTERPRISE 4.86 0.59 12.14 1
515 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Jaugram piped Water Supply Scheme at Jamalpur Block under Burdwan Division PHE. DTE. , SM/09104 Retrofitting Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of Jaugram Piped Water Supply Scheme at Jaugram Village (P) (Mouza), Jamalpur Block under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000278/2021-2022 6952/BWD 14/12/2021 30 SAIKAT RAY 33.69 29.78 88.39 1
516 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Jaugram piped Water Supply Scheme at Jamalpur Block under Burdwan Division PHE. DTE. , SM/09104 Retrofitting Replace damaged and chokaged various dia. A.C. Pipeline with UPVC pipes, construction of valve chambers and providing FHTC at mouza (Habitation) under JOUGRAM PWSS, Jamalpur Development Block of Burdwan Sub-Division under Burdwan Division, PHE Dte". Gr.B. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000475/2022-2023 1599/BSD 14/09/2022 30 MUKHERJEE ENTERPRISE 3.38 3.19 94.38 1
517 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Jaugram piped Water Supply Scheme at Jamalpur Block under Burdwan Division PHE. DTE. , SM/09104 Retrofitting Land Development at Jougram 4th T/W Site at Jamalpur Block under Burdwan Sub Division in Burdwan Division,PHE Dte. Gr.G. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000445/2022-2023 1487/BSD 26/08/2022 30 PANCHANAN CHAKROBORTY 1.17 1.10 94.02 1
518 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Jaugram piped Water Supply Scheme at Jamalpur Block under Burdwan Division PHE. DTE. , SM/09104 Retrofitting Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Ilsora village and Ilsora habitation of JAUGRAM Piped Water Supply Scheme within Burdwan Sub-Divn. under Burdwan Division, PHE. Dte. [Phase - I] [GROUP : ¿6A¿] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000779/2020-2021 3330/BWD 18/09/2020 30 MUKHERJEE ENTERPRISE 4.86 4.86 100 1
519 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Jaugram piped Water Supply Scheme at Jamalpur Block under Burdwan Division PHE. DTE. , SM/09104 Retrofitting Replacement of 775 meter AC pipeline by using UPVC pipeline in Jaugram piped water supply scheme at Jamalpur Block under Burdwan Division PHE Dte.Gr.A. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000400/2021-2022 69/BSD 14/01/2022 30 MUKHERJEE ENTERPRISE 4.83 4.71 97.52 1
520 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Jaugram piped Water Supply Scheme at Jamalpur Block under Burdwan Division PHE. DTE. , SM/09104 Retrofitting Providing leftout water tap connection in different villages for 100% coverage to make it Sajal Gram from existing distribution system within scheme jurisdiction of different Piped Water Supply Schemes within Jamalpur Block (Paratal-II, Berugram, Abujhati & Chakdighi G.P.) under Burdwan Division, PHE. Dte. (Part-B). AE(HQs),Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JE/RWS/JAMALPUR ORD/000345/2021-2022 40/BWD 05/01/2022 30 PREMANANDA ROY BISWAS 22.68 3.33 14.68 1
521 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Jaugram piped Water Supply Scheme at Jamalpur Block under Burdwan Division PHE. DTE. , SM/09104 Retrofitting Construction of Boundary wall at 4th Tubewell site Of Jaugram Water Supply scheme under JAMALPUR Block of Burdwan Division, PHE Dte. (LENGTH- 71.0M, COL.- 28 NOS )Gr.F. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000650/2021-2022 471/BSD 21/03/2022 45 PANCHANAN CHAKROBORTY 3.77 3.72 98.67 1
522 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Jaugram piped Water Supply Scheme at Jamalpur Block under Burdwan Division PHE. DTE. , SM/09104 Retrofitting Providing leftout water tap connection in different villages for 100% coverage to make it Sajal Gram from existing distribution system within scheme jurisdiction of different Piped Water Supply Schemes within Jamalpur Block (Jarogram, Ajhapur, Panchra & Jougram G.P.) under Burdwan Division, PHE. Dte. (Part-A)_2ND CALL. AE(HQs),Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JE/RWS/JAMALPUR ORD/000592/2021-2022 1454/BWD 11/03/2022 30 PREMANANDA ROY BISWAS 18.83 0.00 0 1
523 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Jaugram piped Water Supply Scheme at Jamalpur Block under Burdwan Division PHE. DTE. , SM/09104 Retrofitting Construction of Boundary wall at 3RD Tubewell site Of Jaugram Water Supply scheme under JAMALPUR Block of Burdwan Division, PHE Dte. (LENGTH- 70.0M , COL- 28 NOS ) Gr.E Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000649/2021-2022 470/BSD 21/03/2022 45 MUKHERJEE ENTERPRISE 3.83 3.81 99.48 1
524 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Jaugram piped Water Supply Scheme at Jamalpur Block under Burdwan Division PHE. DTE. , SM/09104 Retrofitting BALANCE PORTION Boundary wall at 3RD Tubewell site Of Jaugram Water Supply scheme under JAMALPUR Block of Burdwan Division, PHE Dte. (LENGTH- 34.0M , COL- 14 NOS) GROUP : G Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000086/2022-2023 820/BSD 20/05/2022 45 MUKHERJEE ENTERPRISE 3.30 3.29 99.7 1
525 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Jaugram piped Water Supply Scheme at Jamalpur Block under Burdwan Division PHE. DTE. , SM/09104 Retrofitting Repairing and Restoration of damaged and chokaged various Dia UPVC Pipeline and Construction of Valve Chambers to conrrol flow of waer for providing FHTC in JOUGRAM PWSS at Jamalpur Dev.block under Burdwan Division,PHE Dte.Group : D. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000112/2022-2023 1017/BSD 20/06/2022 30 MUKHERJEE ENTERPRISE 1.43 1.39 97.2 1
526 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Jaugram piped Water Supply Scheme at Jamalpur Block under Burdwan Division PHE. DTE. , SM/09104 Retrofitting Concrete road at Head Work site Tubewell site of Jaugram Water Supply Scheme under JAMALPUR Block of Burdwan Division, PHE Dte. Gr.L Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000484/2022-2023 1608/BSD 14/09/2022 15 DUBE ENTERPRISE 1.70 0.00 0 1
527 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Jaugram piped Water Supply Scheme at Jamalpur Block under Burdwan Division PHE. DTE. , SM/09104 Retrofitting Continuation work order for Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Ilsora village and Ilsora habitation of JAUGRAM Piped Water Supply Scheme within Burdwan Sub-Divn. under Burdwan Division, PHE. Dte. [Phase - I] [GROUP : ¿6A¿] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. Junior Engineer, R.W.S. Burdwan Sub Division, P.H.E. Dt ORD/001347/2020-2021 4513/BWD 12/11/2020 30 MUKHERJEE ENTERPRISE 4.86 1.98 40.74 100
528 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Jaugram piped Water Supply Scheme at Jamalpur Block under Burdwan Division PHE. DTE. , SM/09104 Retrofitting Laying of 100 mm dia D.I Pipe for Road widening from 4 lane to 6 lane of NH2 at chainage 599+654 & 599+154 at Jougram Water supply within Jamalpur Block,under Burdwan Division,PHE Dte". Group : B. ORD/000109/2022-2023 981/BSD 16/06/2022 30 PRATIVA CONSTRUCTION 2.97 0.00 0 0
529 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Jaugram piped Water Supply Scheme at Jamalpur Block under Burdwan Division PHE. DTE. , SM/09104 Retrofitting Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Moyna Habitation of Jougram Piped Water Supply Scheme within Burdwan Sub-Divn. under Burdwan Division, PHE. Dte. [GROUP - 'B'] ORD/001346/2020-2021 2401/BWD 20/07/2020 30 DEY NIRMAN 4.92 4.05 82.32 100
530 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Jaugram piped Water Supply Scheme at Jamalpur Block under Burdwan Division PHE. DTE. , SM/09104 Retrofitting Providing FHTC for Dogachia Mouza [(Habitation (Village)] for AMRA piped W/S Scheme, Jamalpur Dev. Block under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000068/2023-2024 2019/BWD 28/04/2023 30 DEY NIRMAN 20.61 0.00 0 100
531 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Jaugram piped Water Supply Scheme at Jamalpur Block under Burdwan Division PHE. DTE. , SM/09104 Retrofitting Continuation work order for Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Jougram village (Jougram habitation) of Jougram Piped Water Supply Scheme within Burdwan Sub-Divn. under Burdwan Division, PHE. Dte. (Part-B) [SL. No. : 13] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. Junior Engineer, R.W.S. Burdwan Sub Division, P.H.E. Dt ORD/000444/2020-2021 1398/BWD 15/02/2021 15 DEY NIRMAN 4.84 4.84 100 0
532 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Jaugram piped Water Supply Scheme at Jamalpur Block under Burdwan Division PHE. DTE. , SM/09104 Retrofitting Laying of pipeline for providing FHTC 100% coverage and also construction & installation of Sluice Valve & Valve Chamber to control the flow of water, road restoration work etc. of different Piped W/S Schemes, Block Jamalpur under Burdwan Division, PHE Dte. AE(HQs) Junior Engineer, Burdwan Division ORD/000194/2024-2025 2488/BWD 01/07/2024 120 M/S NATIONAL CONSTRUCTION 480.97 0.00 0 0
533 PURBA BARDHAMAN Kalna - II Burdwan Division CHAK SHIMLA PIPE WATER SUPPLY SCHEME. , SM/15586 New Material Requisition To Resource Division RTOR000072/2023-2024 1962/BWD 25/04/2023 Resource Division 8.53 0.00 0 0
534 PURBA BARDHAMAN Kalna - II Burdwan Division CHAK SHIMLA PIPE WATER SUPPLY SCHEME. , SM/15586 New Material Requisition To Resource Division RTOR000287/2023-2024 2197/BWD 12/05/2023 Resource Division 9.27 0.00 0 0
535 PURBA BARDHAMAN Kalna - II Burdwan Division CHAK SHIMLA PIPE WATER SUPPLY SCHEME. , SM/15586 New Material Requisition To Resource Division RTOR000793/2023-2024 318/BWD 24/01/2024 Resource Division 30.81 0.00 0 0
536 PURBA BARDHAMAN Kalna - II Central Mechanical CHAK SHIMLA PIPE WATER SUPPLY SCHEME. , SM/15586 New New service connection at Chak Shimla PWSS Ph-1 BILL/02323/2023-2024 BP-2023-24-449 30/01/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 10.74 0.00 0 0
537 PURBA BARDHAMAN Kalna - II Central Mechanical CHAK SHIMLA PIPE WATER SUPPLY SCHEME. , SM/15586 New New service connection at Chak Shimla PWSS Ph-2 BILL/02324/2023-2024 BP-2023-24-450 30/01/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 13.35 0.00 0 0
538 PURBA BARDHAMAN Kalna - II Burdwan Division CHAK SHIMLA PIPE WATER SUPPLY SCHEME. , SM/15586 New Work Order for "CONSTRUCTION OF TEMPORARY KIOSK FOR THE NECESSARY ARRANGEMENT OF ELECTRIFICATION OF TUBEWELL FOR CHAKSIMLA PWSS UNDER KALNA SUB-DIVISION UNDER BURDWAN DIVISION, PHE DTE." Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/001151/2023-2024 2020/KSD 06/03/2024 10 ER CONSTRUCTION & GENERAL ORDER SUPPLIER 0.66 0.00 0 2
539 PURBA BARDHAMAN Kalna - II Central Mechanical CHAK SHIMLA PIPE WATER SUPPLY SCHEME. , SM/15586 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Khargakur & others water supply scheme under Kalna-2 Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000116/2024-2025 2393/CMD 02/08/2024 280 HANNAN BUILDERS PVT LTD 76.80 0.00 0 20
540 PURBA BARDHAMAN Kalna - II Burdwan Division CHAK SHIMLA PIPE WATER SUPPLY SCHEME. , SM/15586 New Material Requisition To Resource Division RTOR000042/2024-2025 322/BWD 15/01/2025 Resource Division 0.67 0.00 0 0
541 PURBA BARDHAMAN Kalna - II Burdwan Division CHAK SHIMLA PIPE WATER SUPPLY SCHEME. , SM/15586 New Different types of works involve in connection with Augmentation of TEHATA Zone-I & II (SM/16301) Water Supply Scheme, CHAKSIMLA (SM/15586) Water Supply Scheme & DWARIATON (SM/16285) Water Supply Scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer JUNIOR ENGINEER RWS KALNA2 ORD/000162/2024-2025 2201/BWD 13/06/2024 222 M/S ASHA CONSTRUCTION 449.98 62.10 13.8 25
542 PURBA BARDHAMAN Kalna - II Burdwan Division CHAK SHIMLA PIPE WATER SUPPLY SCHEME. , SM/15586 New Different works related (sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of different capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site) to BALINDAR, CHAK SHIMLA & DWARIATAN Piped Water Supply Scheme under Kalna II Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000539/2023-2024 3700/BWD 24/08/2023 770 SUPRITI ENTERPRISE 1,424.22 0.00 0 30
543 PURBA BARDHAMAN Kalna - II Central Mechanical CHAK SHIMLA PIPE WATER SUPPLY SCHEME. , SM/15586 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at CHAK SIMLA Water Supply Scheme [ Block-KALNA-2 ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. [2nd CALL] ASSISTANT ENGINEER Junior Engineer ORD/000931/2023-2024 4194/CMD 29/08/2023 735 J.S. CONSTRUCTION. 28.48 0.00 0 40
544 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF MANGALKOT PIPED WATER SUPPLY SCHEME , SM/16487 Augmentation Extension and replacement of pipe line from the existing Distribution System within scheme jurisdiction at Mongalkote village under Mongalkote PWSS under Mongalkote Block within Katwa Sub-Division under Burdwan Division PHE Dte. [Sl No-01] Assistant Engineer ORD/000153/2022-2023 437/KTS 27/06/2022 30 NANGTASWAR CO. OP. LABOUR CONT. AND CONSTRUCTION SOCIETY LTD. 4.84 4.81 99.38 0
545 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF MANGALKOT PIPED WATER SUPPLY SCHEME , SM/16487 Augmentation Sinking of 300 X 200mm dia Tube Well 200 mtr. Depth by D.R. Rig method using UPVC pipe (CM) and UPVC Deep Well Screen (RMS) for Augmentation of Mongalkote & Natunhat and its adjoining mouzas Piped Water Supply Scheme, Block - Mongalkote, Dist - Purba Bardhaman under Burdwan Division, PHE Dte. Assistant Engineer ORD/000517/2022-2023 4658/BWD 18/10/2022 30 ANIRUDDHA FARUQUE 13.24 8.79 66.39 1
546 PURBA BARDHAMAN Central Mechanical AUGMENTATION OF MANGALKOT PIPED WATER SUPPLY SCHEME , SM/16487 Augmentation Supply & Installation of Submersible Pumping Machinery , Voltage Stabilizer, Chlorination system and internal House wiring for Tube well no.- 1&2 at Augmentation of Mongolkot Water Supply Scheme under CMD, PHE Dte., Dist.- Purba-Bardhaman. Driller In-Charge Junior Engineer ORD/000120/2023-2024 2631/CMD 13/06/2023 30 S.K. ELECTRICALS 22.05 0.00 0 0
547 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF MANGALKOT PIPED WATER SUPPLY SCHEME , SM/16487 Augmentation Detail route survey, design of distribution network and preparation of estimate, drawing & DPR for providing FHTC in the scheme MONGALKOTE PWSS (Sl No-06) Assistant Engineer JUNIOR ENGINEER KATWA SUB-DIVISION PHE DTE ORD/000074/2023-2024 399/KTS 13/04/2023 30 SIRCON ENGINEERING SERVICES 2.93 2.93 100 100
548 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF MANGALKOT PIPED WATER SUPPLY SCHEME , SM/16487 Augmentation Augmentation of MANGALKOTE Piped Water Supply Scheme with sinking of Tube-well, LDS, Rising Main, FHTC, Construction of 350 cum capacity RCC OHR with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drain and internal pathway at different TW site under MONGALKOTE Block, District:- Purba-Bardhaman. Assistant Engineer JUNIOR ENGINEER R.W.S. BURDWAN SUB-DIVISION PHE DTE ORD/000696/2023-2024 4365/BWD 04/10/2023 365 M/S NATIONAL CONSTRUCTION 689.68 0.00 0 0
549 PURBA BARDHAMAN Central Mechanical AUGMENTATION OF MANGALKOT PIPED WATER SUPPLY SCHEME , SM/16487 Augmentation Yard lighting arrangement & allied works at Mangalkote water supply scheme under Mangalkote Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. Driller In-Charge Junior Engineer ORD/000410/2024-2025 2790/CMD 01/10/2024 60 JAGANNATH ENTERPRISE 13.47 0.00 0 0
550 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF MANGALKOT PIPED WATER SUPPLY SCHEME , SM/16487 Augmentation Different types of works involve in connection with implementation of Aug. Mongalkote, Palishgram, Purba Nowapara, Sitahati, Singhi, Mejhiary & Karui Piped Water Supply Scheme within Katwa Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer ORD/001191/2024-2025 873/BWD 06/03/2025 180 M/S S. CHOUDHURY 588.22 0.00 0 0
551 PURBA BARDHAMAN Central Mechanical AUGUMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR BAGILA , SM/15192 Augmentation New service connection charges for Aug. Bagila PWSS TW-3 BILL/00769/2023-2024 BP-2023-24-67 20/07/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 8.18 0.00 0 0
552 PURBA BARDHAMAN Burdwan Division AUGUMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR BAGILA , SM/15192 Augmentation Construction of Pump House cum chlorine room without sanitary and water supply arrangement at 3rd Tube well site at Bagila village to departmental drawing no-PHE/BD/P.H/DRG/02/DEC-17(Size 3.60 mtr x 3.00 mtr room) for BAGILA its Adjoining Mouza W/S scheme, block -MEMARI-I within Burdwan Sub-Division ,PHE Dte._2ND CALL JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000096/2023-2024 809/BSD 03/05/2023 45 A R TRADERS 3.60 3.55 98.61 100
553 PURBA BARDHAMAN Burdwan Division AUGUMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR BAGILA , SM/15192 Augmentation Laying of 150mm DI pipeline between Bagila health centre to Bagila Baroaritala for BAGILA Piped Water Supply Scheme to provide house connection under memari-I block within Burdwan Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000336/2023-2024 1473/BSD 12/07/2023 15 A R TRADERS 0.97 0.94 96.91 100
554 PURBA BARDHAMAN Burdwan Division AUGUMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR BAGILA , SM/15192 Augmentation Preparation and Submission of DPR for Augmentation of Bagila PWSS under Memari-I Development Block under Burdwan Division, P.H.E Dte.[2nd Call] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000396/2023-2024 1584/BSD 24/07/2023 15 MEASURE LAND 0.78 0.77 98.72 100
555 PURBA BARDHAMAN Central Mechanical AUGUMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR BAGILA , SM/15192 Augmentation Electric quotation for New Service Connection at Bagila W/S (Aug.) Scehem PH-IV. BILL/01783/2023-2024 BP-2023-24-291 26/12/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.43 0.00 0 0
556 PURBA BARDHAMAN Burdwan Division AUGUMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR BAGILA , SM/15192 Augmentation Interconnection between Head Work site T/W to 2nd T/W site for BAGILA Piped Water Supply Scheme to provide house connection within Burdwan Sub-Division under Burdwan Division, PHE Dte. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000182/2023-2024 1006/BSD 06/06/2023 30 A R TRADERS 0.96 0.47 48.96 100
557 PURBA BARDHAMAN Central Mechanical AUGUMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR BAGILA , SM/15192 Augmentation Supply & Installation of Submersible Pumping Machinery , Voltage Stabilizer, Chlorination system and internal House wiring for Tube well no.- 1 at Augumentation of Bagila Water Supply Scheme under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER Junior Engineer ORD/000085/2023-2024 2591/CMD 07/06/2023 30 SUBRATA BHADRA 11.09 10.33 93.15 50
558 PURBA BARDHAMAN Burdwan Division AUGUMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR BAGILA , SM/15192 Augmentation Restoration Rising main line for FHTC work and Construction of boundary wall at Head work site with gate and land development, drain and internal pathway and for BAGILA PWSS under Memari-I Block, District:- Purba-Bardhaman. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000904/2023-2024 5381/BWD 08/12/2023 60 SK RAJU 35.42 0.00 0 100
559 PURBA BARDHAMAN Central Mechanical AUGUMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR BAGILA , SM/15192 Augmentation Supply & delivery of standby Submersible pumping machinery & automatic Chlorinator for Bagila & others water supply scheme, under CMD, P.H.E. Dte., Dist.- Purba Bardhaman ASSISTANT ENGINEER Junior Engineer ORD/001416/2023-2024 152/CMSD 22/01/2024 15 BEHERA ENTERPRISE 1.74 0.00 0 100
560 PURBA BARDHAMAN Burdwan Division AUGUMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR BAGILA , SM/15192 Augmentation Replacement of Tube-well & Rising main at HEAD TW SITE for Aug. of BAGILA, SASINARA ZONE-I, SASINARA ZONE-II, Piped Water Supply Scheme within MEMARI-I Block under Burdwan Division, PHE. Dte. District:- Purba-Bardhaman. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000974/2023-2024 027/BWD 03/01/2024 60 KOUSIK MALLICK 38.87 0.00 0 90
561 PURBA BARDHAMAN Central Mechanical AUGUMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR BAGILA , SM/15192 Augmentation Illumination arrangement & different electro-mechanical works at BAGILA water supply scheme under Memari-I Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. ASSISTANT ENGINEER Junior Engineer ORD/000414/2024-2025 2795/CMD 01/10/2024 60 GOENKA ENTERPRISE 14.16 0.00 0 0
562 PURBA BARDHAMAN Burdwan Division AUGUMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR BAGILA , SM/15192 Augmentation Conducting physical Household Survey at the IMIS reported village for HGJ certification and providing balance FHTC for Har Ghar Jal certification including conducting Gram Sabhas for different IMIS reported villages across the district under Burdwan Division, PHE Dte. AE(HQs),Assistant Engineer ,Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE.,Assistant Engineer, Durgapur Sub Division, P.H.E. Dte JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000428/2024-2025 3107/BWD 12/08/2024 90 TUBGRAM GRAMMYAK UNNAYAN SAMITY 309.60 0.00 0 50
563 PURBA BARDHAMAN Burdwan Division AUGUMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR BAGILA , SM/15192 Augmentation Balance pipeline work on distribution system for FHTC work for BAGILA Piped Water Supply Scheme at BAHARAMPUR mouza within MEMARI - I BLOCK under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/001069/2024-2025 359/BWD 16/01/2025 60 H SAMANTA 10.15 0.00 0 0
564 PURBA BARDHAMAN Central Mechanical AUGUMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR BAGILA , SM/15192 Augmentation Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.- 4 at Augmentation of BAGILA Water Supply Scheme [ BLOCK- MEMARI-1 ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER Junior Engineer ORD/001608/2023-2024 1537/CMD 05/03/2024 240 SUDIKSHA CONSTRUCTION 12.32 0.00 0 100
565 PURBA BARDHAMAN Burdwan Division AUGUMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR BAGILA , SM/15192 Augmentation Augmentation of BAGILA Piped Water Supply Scheme with sinking of Tube-well, LDS & FHTC For Songoti Pally, LDS & FHTC For Station Para & LDS & FHTC For Taktipur, Baharampur, Krishnapur, Talchina & Kiskinda Habitation under Memari-I Block, District:- Purba-Bardhaman. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000172/2023-2024 3036/BWD 14/07/2023 537 H SAMANTA 149.26 41.34 27.7 85
566 PURBA BARDHAMAN Central Mechanical AUGMENTATION OF PANUHAT PIPED WATER SUPPLY SCHEME , SM/15555 Augmentation Supply & Installation of Submersible Pumping Machinery , Voltage Stabilizer, Chlorination system and internal House wiring for Tube well no.- 1 at Augumentation of Panuhat Water Supply Scheme under CMD, PHE Dte., Dist.- Purba-Bardhaman. Driller In-Charge Junior Engineer ORD/000084/2023-2024 2581/CMD 07/06/2023 30 DUTTA ENTERPRISE 11.02 0.00 0 0
567 PURBA BARDHAMAN Central Mechanical AUGMENTATION OF PANUHAT PIPED WATER SUPPLY SCHEME , SM/15555 Augmentation NEW SERVICE CONNECTION FOR ADDITIONAL TUBE WELL AT PANUHAT BILL/00128/2024-2025 BP-2024-25-62 26/04/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 5.52 0.00 0 0
568 PURBA BARDHAMAN Central Mechanical AUGMENTATION OF PANUHAT PIPED WATER SUPPLY SCHEME , SM/15555 Augmentation Quotation for new service connection at Augmentation of Panuhat PWSS TW - 01. BILL/00749/2024-2025 BP-2024-25-283 10/09/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.98 0.00 0 0
569 PURBA BARDHAMAN Central Mechanical AUGMENTATION OF PANUHAT PIPED WATER SUPPLY SCHEME , SM/15555 Augmentation Yard lighting arrangement & allied works at Panuhat water supply scheme under Katwa-1 Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. Driller In-Charge JUNIOR ENGINEER ORD/000464/2024-2025 2791/CMD 01/10/2024 60 BEHERA ENTERPRISE 7.11 0.00 0 0
570 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF PANUHAT PIPED WATER SUPPLY SCHEME , SM/15555 Augmentation Construction of Pump House, Boundary walls and Raising Main for Aug. of PANUHAT Piped W/S. Scheme under Katwa-I Block, District:- Purba-Bardhaman. Assistant Engineer Junior Engineer, R.W.S., Katwa-I Dev. Block ORD/000923/2023-2024 5484/BWD 13/12/2023 60 SUBODH KUMAR MONDAL 9.73 0.00 0 26
571 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF PANUHAT PIPED WATER SUPPLY SCHEME , SM/15555 Augmentation Repairing work of 2 (TWO) Nos. Pump House in connection with Panuhat- Piped Water Supply Scheme (SM/15555) under Katwa Sub-Division under Burdwan Division, PHE Dte. (Sl No-4) ORD/001328/2024-2025 460/KTS 17/03/2025 30 HAMID SK 2.59 0.00 0 0
572 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF PANUHAT PIPED WATER SUPPLY SCHEME , SM/15555 Augmentation Augmentation of PANUHAT Piped Water Supply Scheme with sinking of Tube-well, LDS, Rising Main, FHTC, Construction of 350 cum capacity RCC OHR with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drain and internal pathway at different TW site under KATWA-I Block, District:- Purba-Bardhaman. Assistant Engineer Junior Engineer, R.W.S., Katwa-I Dev. Block ORD/000858/2023-2024 5204/BWD 29/11/2023 489 SHUBHRA KANTI GHOSH 322.65 0.00 0 15
573 PURBA BARDHAMAN Central Mechanical AUGMENTATION RAYAN PART IV (DURGADANGA) PIPED WATER SUPPLY SCHEME , SM/15556 Augmentation Quotation for new service connection of Rayan (Aug) Part-4 (Durgadanga) PWSS TW 1 BILL/00443/2024-2025 BP-2024-25-236 30/07/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 5.91 0.00 0 0
574 PURBA BARDHAMAN Burdwan Division AUGMENTATION RAYAN PART IV (DURGADANGA) PIPED WATER SUPPLY SCHEME , SM/15556 Augmentation Augmentation RAYAN (Part-IV) (Durgadanga) Piped Water Supply Scheme with sinking of Tube-well, LDS, Rising Main, FHTC, Construction of switch rooms & boundary walls with gates at different TW site under Burdwan - I Block, District:- Purba-Bardhaman. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000994/2023-2024 245/BWD 15/01/2024 120 DHIRENDRANATH SOM 93.34 0.00 0 80
575 PURBA BARDHAMAN Burdwan Division AUGMENTATION RAYAN PART IV (DURGADANGA) PIPED WATER SUPPLY SCHEME , SM/15556 Augmentation Material Requisition To Resource Division RTOR000003/2024-2025 4102/BWD 25/11/2024 Resource Division 10.19 0.00 0 0
576 PURBA BARDHAMAN Burdwan Division AUGMENTATION RAYAN PART IV (DURGADANGA) PIPED WATER SUPPLY SCHEME , SM/15556 Augmentation Route Survey & Preparation of DPR for RAYAN PART-(IV) DURGA DANGA W/S Scheme under Burdwan-I Block under Burdwan Sub- Division under Burdwan Division PHE Dte JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000851/2024-2025 2587/BSD 26/11/2024 45 APEX ENGINEERING 2.43 0.00 0 0
577 PURBA BARDHAMAN Central Mechanical AUGMENTATION RAYAN PART IV (DURGADANGA) PIPED WATER SUPPLY SCHEME , SM/15556 Augmentation Supply & Installation of Submersible Pumping Machinery , Voltage Stabilizer, Chlorination system and internal House wiring for Tube well no.- 1&2 at Augumentation of Rayan. Part -4 Durgadanga Water Supply Scheme under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER Junior Engineer ORD/000095/2023-2024 2597/CMD 07/06/2023 693 M/S, S.S. ENTERPRISE. 24.11 0.00 0 50
578 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GANGAGTIKURI PIPED WATER SUPPLY SCHEME , SM/15159 Augmentation Detail route survey, design of distribution network and preparation of estimate, drawing & DPR for providing FHTC in the scheme GANGATIKURI PWSS (Sl No-04) Assistant Engineer JUNIOR ENGINEER KATWA SUB-DIVISION PHE DTE ORD/000072/2023-2024 396/KTS 13/04/2023 30 SIRCON ENGINEERING SERVICES 2.49 2.49 100 100
579 PURBA BARDHAMAN Central Mechanical AUGMENTATION OF GANGAGTIKURI PIPED WATER SUPPLY SCHEME , SM/15159 Augmentation Yard lighting arrangement & allied works at Gangatikuri water supply scheme under Ketugram-II Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. Driller In-Charge JUNIOR ENGINEER ORD/000408/2024-2025 2788/CMD 01/10/2024 60 DILIP MAHATO 15.98 0.00 0 0
580 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GANGAGTIKURI PIPED WATER SUPPLY SCHEME , SM/15159 Augmentation Continuation Work Order for Supply of 1 (one) No. Inspection Vehicle for different JJM Related Works as and when required including supply of driver and fuels (Minimum 8 Hours of duty) under Katwa Sub-Division within Burdwan Division, P.H.E. Dte. Consider 96.00 Km run per Day Assistant Engineer JUNIOR ENGINEER KATWA SUB-DIVISION PHE DTE ORD/000683/2024-2025 1009/KTS 19/07/2024 60 AJIT SAMANTA 0.77 0.15 19.48 100
581 PURBA BARDHAMAN Central Mechanical AUGMENTATION OF GANGAGTIKURI PIPED WATER SUPPLY SCHEME , SM/15159 Augmentation Quotation for new service connection at Augmentation of Gangatikuri PWSS TW-1 BILL/01093/2024-2025 BP-2024-25-402 22/11/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 4.88 0.00 0 0
582 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GANGAGTIKURI PIPED WATER SUPPLY SCHEME , SM/15159 Augmentation Protection work for construction of concrete road along with other allied work in connection with Gangatikuri PWSs (SM/15159) under Ketugram II Block under Katwa Sub Division within Burdwan Division, PHE. Dte. Assistant Engineer ORD/001059/2024-2025 258/BWD 14/01/2025 21 S.S. ENTERPRISE 34.25 0.00 0 0
583 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GANGAGTIKURI PIPED WATER SUPPLY SCHEME , SM/15159 Augmentation Augmentation of GANGATIKURI Piped Water Supply Scheme with sinking of Tube-well, LDS, Rising Main, FHTC, Construction of 150 cum capacity RCC OHR with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drain and internal pathway at different TW site under KETUGRAM-II Block, District:- Purba-Bardhaman. Assistant Engineer JUNIOR ENGINEER KATWA SUB-DIVISION PHE DTE ORD/000897/2023-2024 5375/BWD 07/12/2023 602 S.S. ENTERPRISE 194.38 28.66 14.74 56
584 PURBA BARDHAMAN Central Mechanical AUGMENTATION OF GANGAGTIKURI PIPED WATER SUPPLY SCHEME , SM/15159 Augmentation Supply & Installation of Submersible Pumping Machinery , Voltage Stabilizer, Chlorination system and internal House wiring for Tube well no.- 1&2 at Augumentation of Gangatikuri Water Supply Scheme under CMD, PHE Dte., Dist.- Purba-Bardhaman. Driller In-Charge Junior Engineer ORD/000093/2023-2024 2584/CMD 07/06/2023 30 M/S, S.S. ENTERPRISE. 22.60 0.00 0 44
585 PURBA BARDHAMAN Ketugram - I Burdwan Division PANDUGRAM PIPED WATER SUPPLY SCHEME , SM/15160 New Material Requisition To Resource Division RTOR000012/2023-2024 1962/BWD 25/04/2023 Resource Division 0.69 0.00 0 0
586 PURBA BARDHAMAN Ketugram - I Burdwan Division PANDUGRAM PIPED WATER SUPPLY SCHEME , SM/15160 New Material Requisition To Resource Division RTOR000362/2023-2024 2197/BWD 12/05/2023 Resource Division 17.57 0.00 0 0
587 PURBA BARDHAMAN Ketugram - I Burdwan Division PANDUGRAM PIPED WATER SUPPLY SCHEME , SM/15160 New Material Requisition To Resource Division RTOR000627/2023-2024 4873/BWD 10/11/2023 Resource Division 29.60 0.00 0 0
588 PURBA BARDHAMAN Ketugram - I Central Drilling PANDUGRAM PIPED WATER SUPPLY SCHEME , SM/15160 New Providing drilling crew and other allied works for construction of Tube Well (250mm X200mm X 114 Mtrs. Depth) by utilising Departmental Machineries for Pandugram W/S Scheme (T/W-I & II) , Ketugram-I Block under PurbaBardhman District, Central Drilling Division, P.H.E. Dte. Driller In Charge Junior Engineer ORD/000169/2023-2024 1347/CDD 13/09/2023 30 M/S S.K.GHOSH & CO. 16.67 0.00 0 0
589 PURBA BARDHAMAN Ketugram - I Central Mechanical PANDUGRAM PIPED WATER SUPPLY SCHEME , SM/15160 New New service connection charges for Pandugram PWSS TW-2 BILL/01724/2023-2024 BP-2023-24-253 07/12/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 1.61 0.00 0 0
590 PURBA BARDHAMAN Ketugram - I Central Mechanical PANDUGRAM PIPED WATER SUPPLY SCHEME , SM/15160 New New electric connection for Pandugram PWSS, PH-1. BILL/01875/2023-2024 BP-2023-24-378 16/01/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 5.98 0.00 0 0
591 PURBA BARDHAMAN Ketugram - I Central Mechanical PANDUGRAM PIPED WATER SUPPLY SCHEME , SM/15160 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Rajur & others water supply scheme under Ketugram-I Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. Driller In-Charge Junior Engineer ORD/000098/2024-2025 2407/CMD 02/08/2024 90 M.S. ENTERPRISE 82.29 0.00 0 0
592 PURBA BARDHAMAN Ketugram - I Burdwan Division PANDUGRAM PIPED WATER SUPPLY SCHEME , SM/15160 New Balance work for OHR, extension of pipeline to provide FHTC with sinking of tube well, construction of pump house, boundary wall, land development, plinth protection for pump house, approach road & other related work under Ankhona, Pandugram, Sripur PWSS under Katwa Sub Division, Block- Ketugram-I, Burdwan Division PHE Dte. Assistant Engineer JUNIOR ENGINEER R.W.S. BURDWAN SUB-DIVISION PHE DTE ORD/000286/2024-2025 2738/BWD 12/07/2024 120 PUSPA ENTERPRISE 128.29 0.00 0 75
593 PURBA BARDHAMAN Ketugram - I Central Mechanical PANDUGRAM PIPED WATER SUPPLY SCHEME , SM/15160 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at PANDUGRAM Water Supply Scheme [ Block- KETUGRAM-1] under CMD, PHE Dte., Dist.- Purba-Bardhaman. Driller In-Charge Junior Engineer ORD/000861/2023-2024 4128/CMD 29/08/2023 30 MENAKA ENTERPRISE. 26.95 0.00 0 48
594 PURBA BARDHAMAN Ketugram - I Burdwan Division PANDUGRAM PIPED WATER SUPPLY SCHEME , SM/15160 New Different works related (sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of different capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site) to ANKHONA, PANDUGRAM & SRIPUR Piped Water Supply Scheme under KETUGRAM¿I Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer JUNIOR ENGINEER R.W.S. BURDWAN SUB-DIVISION PHE DTE ORD/000436/2023-2024 3388/BWD 03/08/2023 365 PUSPA ENTERPRISE 989.13 0.00 0 50
595 PURBA BARDHAMAN Ketugram - I Central Mechanical PANDUGRAM PIPED WATER SUPPLY SCHEME , SM/15160 New Quotation for burnt meter problem at Pandugram PWSS TW-2 BILL/00937/2024-2025 BP-2024-25-408 11/12/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 0.07 0.00 0 0
596 PURBA BARDHAMAN Ketugram - I Burdwan Division MORGRAM PIPED WATER SUPPLY SCHEME , SM/15163 New Material Requisition To Resource Division RTOR000010/2023-2024 1962/BWD 25/04/2023 Resource Division 3.97 0.00 0 0
597 PURBA BARDHAMAN Ketugram - I Burdwan Division MORGRAM PIPED WATER SUPPLY SCHEME , SM/15163 New Material Requisition To Resource Division RTOR000344/2023-2024 2197/BWD 12/05/2023 Resource Division 17.45 0.00 0 0
598 PURBA BARDHAMAN Ketugram - I Burdwan Division MORGRAM PIPED WATER SUPPLY SCHEME , SM/15163 New Material Requisition To Resource Division RTOR000745/2023-2024 5257/BWD 30/11/2023 Resource Division 20.18 0.00 0 0
599 PURBA BARDHAMAN Ketugram - I Central Drilling MORGRAM PIPED WATER SUPPLY SCHEME , SM/15163 New Providing drilling crew and other allied works for construction of Tube Well (250mm X200mm X 114 Mtrs. Depth) by utilising Departmental Machineries for Morgram W/S Scheme (T/W-I & II) , Ketugram-I Block under PurbaBardhman District, Central Drilling Division, P.H.E. Dte. Driller In Charge Junior Engineer ORD/000170/2023-2024 1346/CDD 13/09/2023 30 S B S ENTERPRISE 16.67 0.00 0 0
600 PURBA BARDHAMAN Ketugram - I Central Mechanical MORGRAM PIPED WATER SUPPLY SCHEME , SM/15163 New Quotation for new service connection at Morgram W/S Scheme PH-II. BILL/01806/2023-2024 BP-2023-24-316 30/12/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.70 0.00 0 0
601 PURBA BARDHAMAN Ketugram - I Central Mechanical MORGRAM PIPED WATER SUPPLY SCHEME , SM/15163 New Quotation for new service connection at Morgram W/S Scheme PH-I. BILL/01805/2023-2024 BP-2023-24-315 30/12/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.76 0.00 0 0
602 PURBA BARDHAMAN Ketugram - I Central Mechanical MORGRAM PIPED WATER SUPPLY SCHEME , SM/15163 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at MORGRAM Water Supply Scheme [ Block- KETUGRAM-1] under CMD, PHE Dte., Dist.- Purba-Bardhaman. Driller In-Charge Junior Engineer ORD/000857/2023-2024 4125/CMD 29/08/2023 30 JAGANNATH ENTERPRISE 27.79 0.00 0 88
603 PURBA BARDHAMAN Ketugram - I Central Mechanical MORGRAM PIPED WATER SUPPLY SCHEME , SM/15163 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Rajur & others water supply scheme under Ketugram-I Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. Driller In-Charge Junior Engineer ORD/000098/2024-2025 2407/CMD 02/08/2024 90 M.S. ENTERPRISE 82.29 0.00 0 0
604 PURBA BARDHAMAN Ketugram - I Burdwan Division MORGRAM PIPED WATER SUPPLY SCHEME , SM/15163 New Extension work of pipe line MORGRAM Piped W/S. Scheme under Ketugram-I Block under Katwa Sub-Division within Burdwan Division PHE Dte. Assistant Engineer JUNIOR ENGINEER R.W.S. BURDWAN SUB-DIVISION PHE DTE ORD/001067/2023-2024 990/BWD 06/03/2024 120 PUSPA ENTERPRISE 133.47 64.49 48.32 82
605 PURBA BARDHAMAN Ketugram - I Burdwan Division MORGRAM PIPED WATER SUPPLY SCHEME , SM/15163 New Balance work for OHR, extension of pipeline to provide FHTC with sinking of tube well, construction of pump house, boundary wall, land development, plinth protection for pump house, approach road & other related work under Murgram, Moregram, Malgram, Khanji, PWSS under Katwa Sub Division, Block- Ketugram-I, Burdwan Division PHE Dte. Assistant Engineer JUNIOR ENGINEER R.W.S. BURDWAN SUB-DIVISION PHE DTE ORD/000289/2024-2025 2739/BWD 12/07/2024 120 PUSPA ENTERPRISE 185.75 0.00 0 72
606 PURBA BARDHAMAN Ketugram - I Burdwan Division MORGRAM PIPED WATER SUPPLY SCHEME , SM/15163 New Different works related (sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of different capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site) to MALGRAM, MURGRAM, MORGRAM & KHANJI Piped Water Supply Scheme under KETUGRAM -I Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer JUNIOR ENGINEER R.W.S. BURDWAN SUB-DIVISION PHE DTE ORD/000435/2023-2024 3387/BWD 03/08/2023 365 PUSPA ENTERPRISE 1,333.98 0.00 0 40
607 PURBA BARDHAMAN Purbasthali - II Burdwan Division JOYKRISHNAPUR PIPED WATER SUPPLY SCHEME , SM/15172 New Material Requisition To Resource Division RTOR000297/2023-2024 2197/BWD 12/05/2023 Resource Division 12.33 0.00 0 0
608 PURBA BARDHAMAN Purbasthali - II Central Mechanical JOYKRISHNAPUR PIPED WATER SUPPLY SCHEME , SM/15172 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination system and internal House wiring for Tube well no.- 3 at Joykrishnapur Water Supply Scheme under CMD, PHE Dte., Dist.- Purba-Bardhaman. Driller In-Charge JUNIOR ENGINEER ORD/000762/2022-2023 838/CMD 20/02/2023 30 C.M. ENTERPRISE 10.43 9.62 92.23 100
609 PURBA BARDHAMAN Purbasthali - II Burdwan Division JOYKRISHNAPUR PIPED WATER SUPPLY SCHEME , SM/15172 New Material Requisition To Resource Division RTOR000513/2023-2024 4037/BWD 08/09/2023 Resource Division 37.20 0.00 0 0
610 PURBA BARDHAMAN Purbasthali - II Burdwan Division JOYKRISHNAPUR PIPED WATER SUPPLY SCHEME , SM/15172 New Material Requisition To Resource Division RTOR000540/2023-2024 4288/BWD 29/09/2023 Resource Division 0.55 0.00 0 0
611 PURBA BARDHAMAN Purbasthali - II Central Mechanical JOYKRISHNAPUR PIPED WATER SUPPLY SCHEME , SM/15172 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination system and internal House wiring for Tube well no.- 4 at Joykrishnapur Water Supply Scheme under CMD, PHE Dte., Dist.- Purba-Bardhaman. Driller In-Charge JUNIOR ENGINEER ORD/000763/2022-2023 839/CMD 20/02/2023 30 MS MANABESH ROY 10.14 4.80 47.34 100
612 PURBA BARDHAMAN Purbasthali - II Central Mechanical JOYKRISHNAPUR PIPED WATER SUPPLY SCHEME , SM/15172 New Quotation for new service connection at Joykrishnapur W/S Scheme for PH No-1 BILL/01820/2023-2024 BP-2023-24-332 03/01/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 8.57 0.00 0 0
613 PURBA BARDHAMAN Purbasthali - II Central Mechanical JOYKRISHNAPUR PIPED WATER SUPPLY SCHEME , SM/15172 New New service connection charges for Joykrishnapur PWSS TW-1 BILL/02191/2023-2024 BP-2023-24-390 17/01/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.39 0.00 0 0
614 PURBA BARDHAMAN Purbasthali - II Central Mechanical JOYKRISHNAPUR PIPED WATER SUPPLY SCHEME , SM/15172 New Quotation for new service connection at Joykrishnapur PWSS PH-2 BILL/01817/2023-2024 BP-2023-24-333 03/01/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 12.33 0.00 0 0
615 PURBA BARDHAMAN Purbasthali - II Central Mechanical JOYKRISHNAPUR PIPED WATER SUPPLY SCHEME , SM/15172 New NEW SERVICE CONNECTION FOR JOYKRISHNAPUR PIPED WATER SUPPLY SCHEME. BILL/02828/2023-2024 BP-2023-24-592 04/03/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.43 0.00 0 0
616 PURBA BARDHAMAN Purbasthali - II Burdwan Division JOYKRISHNAPUR PIPED WATER SUPPLY SCHEME , SM/15172 New Laying of Rising main in between Tube Well and Distribution Line for Shimulia Village in Galsi -II Block under Durgapur Sub-Division under Burdwan Division, P.H.E. Dte.. Assistant Engineer, Durgapur Sub Division, P.H.E. Dte JUNIOR ENGINEER DURGAPUR SUB-DIVISION PHE DTE ORD/000396/2024-2025 621/DSD 05/08/2024 30 MAA MAHAMAYA CONSTRUCTION 2.15 0.00 0 100
617 PURBA BARDHAMAN Purbasthali - II Burdwan Division JOYKRISHNAPUR PIPED WATER SUPPLY SCHEME , SM/15172 New Work Order for "CONSTRUCTION OF TEMPORARY KIOSK FOR THE NECESSARY ARRANGEMENT OF ELECTRIFICATION OF TUBEWELL FOR JOYKRISHNAPUR PWSS UNDER KALNA SUB-DIVISION UNDER BURDWAN DIVISION, PHE DTE.". Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000569/2024-2025 1015/KSD 07/08/2024 15 DEL DELTA CONSTRUCTION 0.66 0.00 0 100
618 PURBA BARDHAMAN Purbasthali - II Durgapur W/S Division JOYKRISHNAPUR PIPED WATER SUPPLY SCHEME , SM/15172 New Acceptance cum Formal Work order for Laying of interconnection for PH NO-3 (At Taranagar) Pipe Line for under JOYKRISHNAPUR PWSS, Galsi-II Block, under Durgapur W/S Division, PHE Dte. Assistant Engineer-II Contractual Junior Engineer_3 ORD/000162/2024-2025 1410/DWSD 01/10/2024 60 MUNSHI JAVEDUR JAMAN 0.63 0.00 0 100
619 PURBA BARDHAMAN Purbasthali - II Burdwan Division JOYKRISHNAPUR PIPED WATER SUPPLY SCHEME , SM/15172 New Different works related (sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of different capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site) to GHUNI & JOYKRISHNAPUR Piped Water Supply Scheme under Purbasthali II Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000492/2023-2024 3510/BWD 10/08/2023 598 BKB INFRA PROJECTS PRIVATE LIMITED 551.42 0.00 0 20
620 PURBA BARDHAMAN Purbasthali - II Burdwan Division JOYKRISHNAPUR PIPED WATER SUPPLY SCHEME , SM/15172 New Construction of 350cum OHR & Other Allied Works in connection with Augmentation of (SM/07803), (SM/09410), (SM/16304), (SM/15172) & (SM/14020) Piped Water Supply Scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/001048/2024-2025 220/BWD 10/01/2025 270 R.K. MANDAL& CO. 491.79 0.00 0 1
621 PURBA BARDHAMAN Purbasthali - II Durgapur W/S Division JOYKRISHNAPUR PIPED WATER SUPPLY SCHEME , SM/15172 New Material Requisition To Resource Division RTOR000058/2024-2025 478/DWSD 17/03/2025 Resource Division 0.14 0.00 0 0
622 PURBA BARDHAMAN Purbasthali - II Central Mechanical JOYKRISHNAPUR PIPED WATER SUPPLY SCHEME , SM/15172 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at JOYKRISHNAPUR Water Supply Scheme [ Block- PURBASTHALI-2] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000880/2023-2024 4143/CMD 29/08/2023 646 JYOTY SOLAR POWER. 26.98 0.00 0 45
623 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF PURBASTHALI SURFACE WATER BASED PWSS ZONE I , SM/15571 Augmentation Material Requisition To Resource Division RTOR000516/2023-2024 3970/BWD 08/09/2023 Resource Division 18.33 0.00 0 0
624 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF PURBASTHALI SURFACE WATER BASED PWSS ZONE I , SM/15571 Augmentation Material Requisition To Resource Division RTOR000761/2023-2024 202/BWD 10/01/2024 Resource Division 6.16 0.00 0 0
625 PURBA BARDHAMAN Central Mechanical AUGMENTATION OF PURBASTHALI SURFACE WATER BASED PWSS ZONE I , SM/15571 Augmentation Quotation for meter shifting at Purbasthali PWSS PH 1. BILL/00935/2024-2025 BP-2024-25-409 11/12/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 0.05 0.00 0 0
626 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF PURBASTHALI SURFACE WATER BASED PWSS ZONE I , SM/15571 Augmentation Work order for "Route Survey & Preparation of DPR for Augmentation of Purbasthali Surface Water Based PWSS Zone-I (Zone-1A) (SM/15571) under Kalna Sub-Division under Burdwan Division, PHE Dte." (SL-6) Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/001139/2023-2024 2081/KSD 29/02/2024 45 APEX ENGINEERING 2.23 0.00 0 100
627 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF PURBASTHALI SURFACE WATER BASED PWSS ZONE I , SM/15571 Augmentation Augmentation of PURBASTHALI Surface Water Supply Scheme (ZONE-1A) with LDS, Rising Main, FHTC, Construction of 250 cum capacity RCC OHR with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drain and internal pathway at different TW site including laying of Rising Main from Kamalnagar WTP to additional OHR and interconnection Old & New OHR under Purbasthali-II Block, District:- Purba-Bardhaman. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000426/2023-2024 3329/BWD 02/08/2023 606 MANASH GHOSH 513.64 96.80 18.85 20
628 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF PURBASTHALI SURFACE WATER BASED PWSS ZONE I , SM/15571 Augmentation Different types of works involve in connection with Augmentation of KRISHNABATI (SM/07827), PURBASTHLI (SM/07866), SINHARI (SM/09716) & SURFACE based W/S Scheme (SM/15571) Piped water supply scheme under Purbasthali-II Block, Kalna Sub-Division, PHE Dte. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000181/2024-2025 2296/BWD 20/06/2024 360 M/S DATTA ENTERPRISE 579.85 0.00 0 2
629 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF PURBASTHALI SURFACE WATER BASED PWSS ZONE I , SM/15571 Augmentation Supply & Laying of 300mm Dia M.S.E.R.W Pipe including Jack Pushing along with other allied work in connection with different Augmentation & New [(SM/18439, SM/14437, SM/14435, SM/07805, SM/14440, SM/15571, SM/08030, SM/16014, SM/15588, SM/16298 & SM/16307)] under Kalna Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/001187/2024-2025 608/BWD 11/02/2025 180 MANASH GHOSH 1,209.62 0.00 0 0
630 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF PURBASTHALI SURFACE WATER BASED PWSS ZONE II , SM/16014 Augmentation Material Requisition To Resource Division RTOR000762/2023-2024 196/BWD 10/01/2024 Resource Division 6.16 0.00 0 0
631 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF PURBASTHALI SURFACE WATER BASED PWSS ZONE II , SM/16014 Augmentation Digital structurization of pipeline alignment and asset evaluation including holistic design, preparation of design drawings of overall LDS & preparation of estimate for 09 Nos. Piped W/S. Schemes under Purbasthali II Block under Kalna Sub-Division under Burdwan Division, PHE. Dte. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000338/2024-2025 3018/BWD 05/08/2024 50 HORIZEN 23.70 0.09 0.38 10
632 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF PURBASTHALI SURFACE WATER BASED PWSS ZONE II , SM/16014 Augmentation Augmentation of PURBASTHALI Surface Water Supply Scheme (ZONE-4B) with LDS, Rising Main, FHTC, Construction of 600 cum capacity RCC OHR with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drain and internal pathway at different TW site under Purbasthali-II Block, District:- Purba-Bardhaman._2ND CALL Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000895/2023-2024 5371/BWD 07/12/2023 390 TAPAS KUMAR CHAKRABORTY & CO. 819.09 0.00 0 5
633 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF PURBASTHALI SURFACE WATER BASED PWSS ZONE II , SM/16014 Augmentation Supply & Laying of 300mm Dia M.S.E.R.W Pipe including Jack Pushing along with other allied work in connection with different Augmentation & New [(SM/18439, SM/14437, SM/14435, SM/07805, SM/14440, SM/15571, SM/08030, SM/16014, SM/15588, SM/16298 & SM/16307)] under Kalna Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/001187/2024-2025 608/BWD 11/02/2025 180 MANASH GHOSH 1,209.62 0.00 0 0
634 PURBA BARDHAMAN Mangolkote Burdwan Division NAYAPARA PIPED WATER SUPPLY SCHEME , SM/16026 New Material Requisition To Resource Division RTOR000036/2023-2024 1962/BWD 25/04/2023 Resource Division 0.66 0.00 0 0
635 PURBA BARDHAMAN Mangolkote Burdwan Division NAYAPARA PIPED WATER SUPPLY SCHEME , SM/16026 New Material Requisition To Resource Division RTOR000353/2023-2024 2197/BWD 12/05/2023 Resource Division 16.93 0.00 0 0
636 PURBA BARDHAMAN Mangolkote Burdwan Division NAYAPARA PIPED WATER SUPPLY SCHEME , SM/16026 New Material Requisition To Resource Division RTOR000816/2023-2024 297/BWD 24/01/2024 Resource Division 14.50 0.00 0 0
637 PURBA BARDHAMAN Mangolkote Central Mechanical NAYAPARA PIPED WATER SUPPLY SCHEME , SM/16026 New NEW SERVICE CONNECTION FOR NAYAPARA PWSS. BILL/02476/2023-2024 BP-2023-24-532 13/02/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 6.03 0.00 0 0
638 PURBA BARDHAMAN Mangolkote Central Mechanical NAYAPARA PIPED WATER SUPPLY SCHEME , SM/16026 New Supply & Installation of Submersible Pumping Machinery , Voltage Stabilizer, Chlorination system and internal House wiring for Tube well no.- 1 & 2 at NAYAPARA [MANGOLKOTE] Water Supply Scheme under CMD, PHE Dte., Dist.- Purba-Bardhaman. Driller In-Charge Junior Engineer ORD/000892/2023-2024 4155/CMD 29/08/2023 30 P.K. ENGINEERING 21.36 0.00 0 46
639 PURBA BARDHAMAN Mangolkote Central Mechanical NAYAPARA PIPED WATER SUPPLY SCHEME , SM/16026 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Lakshimpur & others water supply scheme under Mangalkote Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman Driller In-Charge Junior Engineer ORD/000097/2024-2025 2406/CMD 02/08/2024 290 CHOUDHURY ENTERPRISE 57.65 0.00 0 10
640 PURBA BARDHAMAN Mangolkote Burdwan Division NAYAPARA PIPED WATER SUPPLY SCHEME , SM/16026 New Sinking of additional tube well, Construction of pump house, Boundary wall, Land development under NAYAPARA PWSS, Katwa Sub-Division, Block- Mongolkote, Burdwan Division PHE Dte. Assistant Engineer JUNIOR ENGINEER KATWA SUB-DIVISION PHE DTE ORD/001102/2024-2025 456/BWD 21/01/2025 90 HI-LIGHT ELECTRONICS 34.04 0.00 0 20
641 PURBA BARDHAMAN Mangolkote Burdwan Division NAYAPARA PIPED WATER SUPPLY SCHEME , SM/16026 New NAYAPARA Piped Water Supply Scheme (Mini Scheme) with sinking of Tube-well, LDS, Rising Main, drain and internal pathway at different TW site under Mongolkote Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer JUNIOR ENGINEER KATWA SUB-DIVISION PHE DTE ORD/000840/2023-2024 5121/BWD 23/11/2023 464 HAMID SK 104.60 26.30 25.14 100
642 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap connection (FHTC) by retrofitting within the command area of KAYRAPUR Piped Water Supply Scheme at AUSGRAM-I Block under Burdwan Division, P.H.E. DTE. , SM/08710 Retrofitting Supply of materials for different water supply scheme under Burdwan Division, PHE Dte. VCH/001237/2021-2022 1132/DW 26/02/2022 EXECUTIVE ENGINEER, RESOURCES DIVISION, P.H.E. DTE. 221.00 0.00 0 0
643 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap connection (FHTC) by retrofitting within the command area of KAYRAPUR Piped Water Supply Scheme at AUSGRAM-I Block under Burdwan Division, P.H.E. DTE. , SM/08710 Retrofitting Providing Functional Household Tap Connection (FHTC) from distribution system within the command area of KAYRAPUR Water Supply Scheme (Part-A) at Belari, Bara, Bhada & Kayrapur (Part) village under JAL SAPNO MISSION under Ausgram-I Block in Purba Bardhanan District under Burdwan Division, P.H.E. Dte. Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000341/2021-2022 26/BWD 04/01/2022 30 NANGTASWAR CO. OP. LABOUR CONT. AND CONSTRUCTION SOCIETY LTD. 42.23 42.94 101.68 1
644 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap connection (FHTC) by retrofitting within the command area of KAYRAPUR Piped Water Supply Scheme at AUSGRAM-I Block under Burdwan Division, P.H.E. DTE. , SM/08710 Retrofitting Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Belari village of Kayrapur Piped W/S Scheme (Part-A) within Durgapur (Bardhaman North) Sub-Division under Burdwan Division, P.H.E. Dte.[Gr.-A] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000286/2021-2022 715/DSD 17/12/2021 15 M/S S. CHOUDHURY 4.83 4.83 100 1
645 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap connection (FHTC) by retrofitting within the command area of KAYRAPUR Piped Water Supply Scheme at AUSGRAM-I Block under Burdwan Division, P.H.E. DTE. , SM/08710 Retrofitting Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Kayrapur vilage of Kayrapur Piped W/S Scheme (Part-A) within Durgapur (Bardhaman North) Sub-Division under Burdwan Division, P.H.E. Dte. [Gr.-B] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000287/2021-2022 716/DSD 17/12/2021 15 M/S S. CHOUDHURY 4.83 4.83 100 1
646 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap connection (FHTC) by retrofitting within the command area of KAYRAPUR Piped Water Supply Scheme at AUSGRAM-I Block under Burdwan Division, P.H.E. DTE. , SM/08710 Retrofitting Continuation work order for Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Belari village of Kayrapur Piped W/S Scheme (Part-A) within Durgapur (Bardhaman North) Sub-Division under Burdwan Division, P.H.E. Dte. [Gr.-A] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000480/2021-2022 736/DSD 28/12/2021 15 M/S S. CHOUDHURY 4.83 4.83 100 1
647 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap connection (FHTC) by retrofitting within the command area of KAYRAPUR Piped Water Supply Scheme at AUSGRAM-I Block under Burdwan Division, P.H.E. DTE. , SM/08710 Retrofitting Continuation work order for Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Kayrapur vilage of Kayrapur Piped W/S Scheme (Part-A) within Durgapur (Bardhaman North) Sub-Division under Burdwan Division, P.H.E. Dte. [Gr.-B] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000481/2021-2022 737/DSD 28/12/2021 15 M/S S. CHOUDHURY 4.83 4.83 100 1
648 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap connection (FHTC) by retrofitting within the command area of KAYRAPUR Piped Water Supply Scheme at AUSGRAM-I Block under Burdwan Division, P.H.E. DTE. , SM/08710 Retrofitting Providing Functional Household Tap Connection (FHTC) from distribution system within the command area of KAYRAPUR Water Supply Scheme (Part-B) at Billogram, Brajapur, Asinda and Noada village under JAL SAPNO MISSION under Ausgram-I Block in Purba Bardhanan District under Burdwan Division, P.H.E. Dte. Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000450/2021-2022 860/BWD 11/02/2022 60 ASHOK KUMAR GHOSH 95.90 51.40 53.6 1
649 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap connection (FHTC) by retrofitting within the command area of KAYRAPUR Piped Water Supply Scheme at AUSGRAM-I Block under Burdwan Division, P.H.E. DTE. , SM/08710 Retrofitting Hire & fuel charges of vehicle (Car No.-WB-37C-8293) for the office of the Assistant Engineer, Durgapur Sub-Division, PHE Dte. for the month of November'2022. BILL/00286/2022-2023 954/JJM/22-23 13/01/2023 SUJAUDDIN SEKH 0.38 0.00 0 0
650 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap connection (FHTC) by retrofitting within the command area of KAYRAPUR Piped Water Supply Scheme at AUSGRAM-I Block under Burdwan Division, P.H.E. DTE. , SM/08710 Retrofitting Continuation work order for Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Bhada village of Kayrapur Piped Water Supply Scheme within Durgapur Sub-Divn. under Burdwan Division, PHE. Dte.. [SL. No. : 20] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000028/2021-2022 3399/BWD 24/06/2021 15 M/S S. CHOUDHURY 4.86 4.86 100 1
651 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap connection (FHTC) by retrofitting within the command area of KAYRAPUR Piped Water Supply Scheme at AUSGRAM-I Block under Burdwan Division, P.H.E. DTE. , SM/08710 Retrofitting Continuation work order for Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Kayrapur village of Kayrapur Piped Water Supply Scheme within Durgapur Sub-Divn. under Burdwan Division, PHE. Dte. [SL. No. : 19] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000029/2021-2022 3398/BWD 24/06/2021 15 M/S S. CHOUDHURY 4.86 4.86 100 1
652 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap connection (FHTC) by retrofitting within the command area of KAYRAPUR Piped Water Supply Scheme at AUSGRAM-I Block under Burdwan Division, P.H.E. DTE. , SM/08710 Retrofitting Laying of rising main in between two number of Tube wells to Over Head Reservoir for Kayrapur water supply scheme (Part-A) within Durgapur Sub-Division in Ausgram-I Block under Burdwan Division, PHE Dte. Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000967/2020-2021 991/BWD 04/02/2021 30 M/S S. CHOUDHURY 7.12 0.00 0 1
653 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap connection (FHTC) by retrofitting within the command area of KAYRAPUR Piped Water Supply Scheme at AUSGRAM-I Block under Burdwan Division, P.H.E. DTE. , SM/08710 Retrofitting Additional cutting of existing concrete pavement between Node J4 to J51 for laying of 300 mm dia D.I distribution in connection with Laying distribution system of Kayrapur Piped Water Supply Scheme at Ausgram-I Block within Durgapur Sub-Division under Burdwan Division, PHE Dte. (Gr.-C) Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000965/2020-2021 109/DSD 29/01/2021 15 M/S S. CHOUDHURY 4.05 0.00 0 1
654 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap connection (FHTC) by retrofitting within the command area of KAYRAPUR Piped Water Supply Scheme at AUSGRAM-I Block under Burdwan Division, P.H.E. DTE. , SM/08710 Retrofitting Continuation work order for Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Koranji village of Kayrapur Piped Water Supply Scheme within Durgapur Sub-Divn. under Burdwan Division, PHE. Dte. [SL. No. : 21] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000030/2021-2022 3397/BWD 24/06/2021 15 M/S S. CHOUDHURY 3.44 3.44 100 1
655 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap connection (FHTC) by retrofitting within the command area of KAYRAPUR Piped Water Supply Scheme at AUSGRAM-I Block under Burdwan Division, P.H.E. DTE. , SM/08710 Retrofitting Land development and Construction of connecting road from PH to OHR at 1st tube well site of KAYRAPUR Water Supply Scheme (Part-B) within Durgapur Sub Division Under Burdwan Division, PHE Dte. Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer2, Durgapur Sub-Division, PHE Dte. ORD/000383/2023-2024 558/DSD 20/07/2023 30 SAMANTA CONSTRUCTION 4.84 0.00 0 0
656 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap connection (FHTC) by retrofitting within the command area of KAYRAPUR Piped Water Supply Scheme at AUSGRAM-I Block under Burdwan Division, P.H.E. DTE. , SM/08710 Retrofitting Restoration of damaged pipeline of distribution main for construction of drain at Billwagram village within Kayrapur W/S Scheme (Part-B) in Ausgram-I Block under Burdwan Division, P.H.E. Dte.[SL-11] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer2, Durgapur Sub-Division, PHE Dte. ORD/000035/2023-2024 159/DSD 13/04/2023 21 SANDIPAN SENGUPTA 0.52 0.52 100 100
657 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap connection (FHTC) by retrofitting within the command area of KAYRAPUR Piped Water Supply Scheme at AUSGRAM-I Block under Burdwan Division, P.H.E. DTE. , SM/08710 Retrofitting Designing, Making and Erection of Sign Board for SAJAL GRAM in Kayrapur Village, Ausgram-I Block within Kayrapur PWSS under Burdwan Division, PHE Dte. (5 Nos Board) ORD/000730/2023-2024 823/AE/HQ 30/10/2023 30 ISHAN CONSTRUCTION 0.76 0.00 0 0
658 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap connection (FHTC) by retrofitting within the command area of KAYRAPUR Piped Water Supply Scheme at AUSGRAM-I Block under Burdwan Division, P.H.E. DTE. , SM/08710 Retrofitting Material Requisition To Resource Division RTOR000121/2021-2022 1110/BWD 26/02/2022 Resource Division 25.78 0.00 0 0
659 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap connection (FHTC) by retrofitting within the command area of KAYRAPUR Piped Water Supply Scheme at AUSGRAM-I Block under Burdwan Division, P.H.E. DTE. , SM/08710 Retrofitting Relaying and restoration of damaged pipeline of distribution main for construction of drain at Brajapur, Chonary and Asinda village to keep on FHTC within Kayrapur W/S Scheme (Part-B) in Ausgram-I Block under Burdwan Division, P.H.E. Dte. Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer2, Durgapur Sub-Division, PHE Dte. ORD/000562/2023-2024 651/DSD 24/08/2023 30 TARAMA AGENCY 0.95 0.47 49.47 100
660 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap connection (FHTC) by retrofitting within the command area of KAYRAPUR Piped Water Supply Scheme at AUSGRAM-I Block under Burdwan Division, P.H.E. DTE. , SM/08710 Retrofitting Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Kayrapur village of Kayrapur Piped Water Supply Scheme within Durgapur Sub-Divn. under Burdwan Division, PHE. Dte. [SL. No. : 19] AE(HQs) J.E. 2 BURDWAN ORD/000534/2020-2021 1459/BWD 18/02/2021 15 M/S S. CHOUDHURY 4.86 4.86 100 0
661 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap connection (FHTC) by retrofitting within the command area of KAYRAPUR Piped Water Supply Scheme at AUSGRAM-I Block under Burdwan Division, P.H.E. DTE. , SM/08710 Retrofitting Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Koranji village of Kayrapur Piped Water Supply Scheme within Durgapur Sub-Divn. under Burdwan Division, PHE. Dte. [SL. No. : 21] AE(HQs) J.E. 2 BURDWAN ORD/000537/2020-2021 1457/BWD 18/02/2021 15 M/S S. CHOUDHURY 4.86 4.86 100 0
662 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap connection (FHTC) by retrofitting within the command area of KAYRAPUR Piped Water Supply Scheme at AUSGRAM-I Block under Burdwan Division, P.H.E. DTE. , SM/08710 Retrofitting Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Bhada village of Kayrapur Piped Water Supply Scheme within Durgapur Sub-Divn. under Burdwan Division, PHE. Dte.. [SL. No. : 20] Junior Engineer2, Durgapur Sub-Division, PHE Dte. ORD/000532/2020-2021 1458/BWD 18/02/2021 15 M/S S. CHOUDHURY 4.86 4.86 100 0
663 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap connection (FHTC) by retrofitting within the command area of KAYRAPUR Piped Water Supply Scheme at AUSGRAM-I Block under Burdwan Division, P.H.E. DTE. , SM/08710 Retrofitting Construction of boundary wall at 2nd Tube well site of KAYRAPUR Water Supply Scheme (Part-B) and its adjoining mouzas, Block-Ausgram-I, under Burdwan Division P.H.E. Dte. Junior Engineer ,Junior Engineer2, Durgapur Sub-Division, PHE Dte. ORD/000988/2023-2024 44/DSD 17/01/2024 30 SK BADIUZZAMAL 3.83 0.00 0 100
664 PURBA BARDHAMAN Durgapur W/S Division Providing Functional Household Tap connection (FHTC) by retrofitting within the command area of KAYRAPUR Piped Water Supply Scheme at AUSGRAM-I Block under Burdwan Division, P.H.E. DTE. , SM/08710 Retrofitting Acceptance cum Formal Work Order for Balance work for distribution system HDPE earth work & concrete work for Kayrapur PWSS, Block- Ausgram-I under Durgapur W/S Division, PHE Dte. Assistant Engineer-II Contractual Junior Engineer_3 ORD/000131/2024-2025 1240/DWSD 29/08/2024 15 TARA MA AGENCY 1.00 0.00 0 100
665 PURBA BARDHAMAN Kalna - II Burdwan Division DWARIATAN PIPED WATER SUPPLY SCHEME , SM/16285 New Material Requisition To Resource Division RTOR000078/2023-2024 1962/BWD 25/04/2023 Resource Division 33.94 0.00 0 0
666 PURBA BARDHAMAN Kalna - II Burdwan Division DWARIATAN PIPED WATER SUPPLY SCHEME , SM/16285 New Material Requisition To Resource Division RTOR000246/2023-2024 2197/BWD 12/05/2023 Resource Division 21.09 0.00 0 0
667 PURBA BARDHAMAN Kalna - II Central Mechanical DWARIATAN PIPED WATER SUPPLY SCHEME , SM/16285 New New electric connection for Dwariatan PWSS, PH-2. BILL/01881/2023-2024 BP-2023-24-353 11/01/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 4.95 0.00 0 0
668 PURBA BARDHAMAN Kalna - II Central Mechanical DWARIATAN PIPED WATER SUPPLY SCHEME , SM/16285 New New Service connection at Dwariatan PWSS PH-1 BILL/02320/2023-2024 BP-2023-24-459 30/01/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 6.24 0.00 0 0
669 PURBA BARDHAMAN Kalna - II Burdwan Division DWARIATAN PIPED WATER SUPPLY SCHEME , SM/16285 New Work Order "CONSTRUCTION OF TEMPORARY KIOSK FOR THE NECESSARY ARRANGEMENT OF ELECTRIFICATION OF TUBEWELL FOR DWARIATON PWSS UNDER KALNA SUB-DIVISION UNDER BURDWAN DIVISION, PHE DTE." Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/001152/2023-2024 2021/KSD 06/03/2024 10 BISWAS ENTERPRISE 0.66 0.00 0 2
670 PURBA BARDHAMAN Kalna - II Central Mechanical DWARIATAN PIPED WATER SUPPLY SCHEME , SM/16285 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at DWARIATAN Water Supply Scheme [ Block- KALNA-2] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/001053/2023-2024 4160/CMD 29/08/2023 30 M/S, S.S. ENTERPRISE. 28.48 0.00 0 40
671 PURBA BARDHAMAN Kalna - II Burdwan Division DWARIATAN PIPED WATER SUPPLY SCHEME , SM/16285 New Different types of works involve in connection with Augmentation of TEHATA Zone-I & II (SM/16301) Water Supply Scheme, CHAKSIMLA (SM/15586) Water Supply Scheme & DWARIATON (SM/16285) Water Supply Scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer JUNIOR ENGINEER RWS KALNA2 ORD/000162/2024-2025 2201/BWD 13/06/2024 222 M/S ASHA CONSTRUCTION 449.98 0.00 0 25
672 PURBA BARDHAMAN Kalna - II Burdwan Division DWARIATAN PIPED WATER SUPPLY SCHEME , SM/16285 New Different works related (sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of different capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site) to BALINDAR, CHAK SHIMLA & DWARIATAN Piped Water Supply Scheme under Kalna II Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000539/2023-2024 3700/BWD 24/08/2023 770 SUPRITI ENTERPRISE 1,424.22 0.00 0 30
673 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF PURBASTHALI SURFACE WATER BASED PWSS ZONE IV , SM/16307 Augmentation Material Requisition To Resource Division RTOR000518/2023-2024 3968/BWD 08/09/2023 Resource Division 28.36 0.00 0 0
674 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF PURBASTHALI SURFACE WATER BASED PWSS ZONE IV , SM/16307 Augmentation Material Requisition To Resource Division RTOR000764/2023-2024 203/BWD 10/01/2024 Resource Division 6.16 0.00 0 0
675 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF PURBASTHALI SURFACE WATER BASED PWSS ZONE IV , SM/16307 Augmentation Work Order for "Route Survey & Preparation of DPR for Augmentation of Purbasthali Surface Water Based PWSS Zone-IV (Zone-IV B) (SM/16307) under Kalna Sub-Division under Burdwan Division, PHE Dte." Sl-3 Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/001136/2023-2024 2071/KSD 29/02/2024 45 APEX ENGINEERING 2.53 0.00 0 100
676 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF PURBASTHALI SURFACE WATER BASED PWSS ZONE IV , SM/16307 Augmentation Work order for "Route Survey & Preparation of DPR for Augmentation of Purbasthali Surface Water Based PWSS Zone-IV (Zone-IV A) (SM/16307) under Kalna Sub-Division under Burdwan Division, PHE Dte." (SL-5) Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/001138/2023-2024 2080/KSD 29/02/2024 45 APEX ENGINEERING 2.27 0.00 0 100
677 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF PURBASTHALI SURFACE WATER BASED PWSS ZONE IV , SM/16307 Augmentation Augmentation of PURBASTHALI Surface Water Supply Scheme (ZONE-4A) with LDS, Rising Main, FHTC, Construction of 250 cum capacity RCC OHR with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drain and internal pathway at different TW site under Purbasthali-II Block, District:- Purba-Bardhaman. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000385/2023-2024 3137/BWD 20/07/2023 730 SAKTI ENTERPRISE 432.83 0.00 0 1
678 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF PURBASTHALI SURFACE WATER BASED PWSS ZONE IV , SM/16307 Augmentation Different types of works involve in connection with Augmentation of KRISHNABATI (SM/07827), PURBASTHLI (SM/07866), SINHARI (SM/09716) & SURFACE based W/S Scheme (SM/15571) Piped water supply scheme under Purbasthali-II Block, Kalna Sub-Division, PHE Dte. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000181/2024-2025 2296/BWD 20/06/2024 360 M/S DATTA ENTERPRISE 579.85 0.00 0 2
679 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF PURBASTHALI SURFACE WATER BASED PWSS ZONE IV , SM/16307 Augmentation Supply & Laying of 300mm Dia M.S.E.R.W Pipe including Jack Pushing along with other allied work in connection with different Augmentation & New [(SM/18439, SM/14437, SM/14435, SM/07805, SM/14440, SM/15571, SM/08030, SM/16014, SM/15588, SM/16298 & SM/16307)] under Kalna Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/001187/2024-2025 608/BWD 11/02/2025 180 MANASH GHOSH 1,209.62 0.00 0 0
680 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR PALASAN , SM/15723 Augmentation Sinking of 300 X 200mm dia Tube Well 150 mtr. Depth by D.R. Rig method using UPVC pipe (CM) and UPVC Deep Well Screen (RMS) for Augmentation of PALASON & its adjoining mouzas Piped Water Supply Scheme, Block - Raina - I, Dist - Purba Bardhaman under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000515/2022-2023 4612/BWD 17/10/2022 30 M/S SYCHROTECH INDUSTRY 10.12 8.33 82.31 0
681 PURBA BARDHAMAN Central Mechanical AUGMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR PALASAN , SM/15723 Augmentation New Service Connection Charges Bill for TW-3 of Aug. Palasan W/S Scheme BILL/00571/2023-2024 BP-2023-24-7 08/05/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 5.39 0.00 0 0
682 PURBA BARDHAMAN Central Mechanical AUGMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR PALASAN , SM/15723 Augmentation Installation of a voltage Correcting device along with allied accessories at PALASAN Water Supply Scheme, Pump House-1, under CMD, PHE Dte., Dist.- Paschim-Bardhaman. ORD/000948/2022-2023 1160/CMD 13/03/2023 30 P.K. ENGINEERING 2.98 2.98 100 0
683 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR PALASAN , SM/15723 Augmentation Construction of Pump House cum chlorine room without sanitary and water supply arrangement at Tube Well Site to departmental drawing no-PHE/BD/P.H/DRG/02/DEC-17(Size 3.60 mtr x 3.00 mtr room) for PALASON its Adjoining Mouza W/S Scheme, Block - Raina-I within Burdwan Sub-Division, PHE Dte. (Mouza- PASCHIM PARA) Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000765/2022-2023 497/BSD 21/03/2023 45 MAA MAHAMAYA CONSTRUCTION 3.63 3.32 91.46 100
684 PURBA BARDHAMAN Central Mechanical AUGMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR PALASAN , SM/15723 Augmentation Supply & Installation of Submersible Pumping Machinery , Voltage Stabilizer, Chlorination system and internal House wiring for Tube well no.- 1 at Augumentation of Palasan Water Supply Scheme under CMD, PHE Dte., Dist.- Purba-Bardhaman. [2nd CALL] ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000206/2023-2024 3047/CMD 20/07/2023 30 S.K. ELECTRICALS 11.09 5.11 46.08 80
685 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR PALASAN , SM/15723 Augmentation Extension Pipeline with Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of PALASHAN Piped Water Supply Scheme within Raina I Block of Burdwan Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000001/2023-2024 1601/BWD 04/04/2023 60 BHOWMICK ENTERPRISE 50.14 0.00 0 100
686 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR PALASAN , SM/15723 Augmentation Improvement work of PALASON Piped Water Supply Scheme for smooth running of FHTC within Raina-I block under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/001195/2023-2024 2739/BSD 28/11/2023 30 ANWESHA CONSTRUCTION 0.95 0.00 0 100
687 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR PALASAN , SM/15723 Augmentation Conducting physical Household Survey at the IMIS reported village for HGJ certification and providing balance FHTC for Har Ghar Jal certification including conducting Gram Sabhas for different IMIS reported villages across the district under Burdwan Division, PHE Dte. AE(HQs),Assistant Engineer ,Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE.,Assistant Engineer, Durgapur Sub Division, P.H.E. Dte JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000428/2024-2025 3107/BWD 12/08/2024 90 TUBGRAM GRAMMYAK UNNAYAN SAMITY 309.60 0.00 0 50
688 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR PALASAN , SM/15723 Augmentation Laying Parallel Pipeline to improve drinking water supply, Construction of Boundary wall, Path Way, Drain at 3rd TW Site and providing leftout FHTC, Road Restoration with allied work for PALASON Piped Water Supply Scheme, Block- Raina-I, within Burdwan Sub Division under Burdwan Division PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000688/2024-2025 3671/BWD 22/10/2024 90 A.K. SIKDAR 42.74 0.00 0 0
689 PURBA BARDHAMAN Galsi - II Burdwan Division KHANO PIPED WATER SUPPLY SCHEME , SM/18313 New Material Requisition To Resource Division RTOR000380/2023-2024 2197/BWD 12/05/2023 Resource Division 8.77 0.00 0 0
690 PURBA BARDHAMAN Galsi - II Burdwan Division KHANO PIPED WATER SUPPLY SCHEME , SM/18313 New Material Requisition To Resource Division RTOR000537/2023-2024 4297/BWD 29/09/2023 Resource Division 1.83 0.00 0 0
691 PURBA BARDHAMAN Galsi - II Burdwan Division KHANO PIPED WATER SUPPLY SCHEME , SM/18313 New Material Requisition To Resource Division RTOR000553/2023-2024 4445/BWD 09/10/2023 Resource Division 14.51 0.00 0 0
692 PURBA BARDHAMAN Galsi - II Burdwan Division KHANO PIPED WATER SUPPLY SCHEME , SM/18313 New Material Requisition To Resource Division RTOR000765/2023-2024 198/BWD 10/01/2024 Resource Division 16.34 0.00 0 0
693 PURBA BARDHAMAN Galsi - II Central Mechanical KHANO PIPED WATER SUPPLY SCHEME , SM/18313 New Quotation for new service connection for Khano PWSS PH 3. BILL/00220/2024-2025 BP-2024-25-110 28/05/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 9.74 0.00 0 0
694 PURBA BARDHAMAN Galsi - II Burdwan Division KHANO PIPED WATER SUPPLY SCHEME , SM/18313 New Hydro-geological study of Sub Surface Water Flow/Storage Characteristics for Creation of Sustainable Source and Estimation of Sustainable Yield (5 Nos of Schemes) in Purba Bardhaman District, West Bengal towards implementation of water supply project. ORD/000872/2023-2024 5324/BWD 01/12/2023 120 THE REGISTRAR JADAVPUR UNIVERSITY 113.34 8.50 7.5 100
695 PURBA BARDHAMAN Galsi - II Central Mechanical KHANO PIPED WATER SUPPLY SCHEME , SM/18313 New New service connection charges for Khano PWSS Z-I TW-2 BILL/00821/2024-2025 BP-2024-25-323 03/10/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 7.90 0.00 0 0
696 PURBA BARDHAMAN Galsi - II Durgapur W/S Division KHANO PIPED WATER SUPPLY SCHEME , SM/18313 New Formal Work Order for Additional Work of Soil investigation and construction of CWR cum Pump House with M.S structural work, Substation, Chlorine Room etc. Land Development of H/W site, drain and internal path way, concrete road and Bituminous Road Restoration, laying of M.S pipe, FHTC with platfrom and necessary allied works of Sub Surface based Taherpur and Khano PWSS (JJM) under Galsi-II Block, Dist- Purba Bardhaman, under Durgapur W/S Division, PHE Dte. Assistant Engineer-II JUNIOR ENGINEER-2 ORD/000161/2024-2025 1507/DWSD 05/11/2024 180 S & P ENTERPRISE 811.59 0.00 0 0
697 PURBA BARDHAMAN Galsi - II Durgapur W/S Division KHANO PIPED WATER SUPPLY SCHEME , SM/18313 New Acceptance cum Formal Work Order for Sinking of 300 X 200mm dia Tube Well 150 mtr. Depth by D.R. Rig method for Trial Bore at Khano under Sanko PWSS (JJM) District:- Purba-Bardhaman, under Durgapur W/S Division, PHE Dte , PHE Dte. Assistant Engineer-II JUNIOR ENGINEER-2 ORD/000154/2024-2025 1600/DWSD 25/11/2024 20 MEGHDOOT GHOSH 5.60 0.00 0 0
698 PURBA BARDHAMAN Galsi - II Durgapur W/S Division KHANO PIPED WATER SUPPLY SCHEME , SM/18313 New New service connection quotation for Khano PWSS TW-2 under DWSD,PHE Dte BILL/00264/2024-2025 null 02/01/2025 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED 4.13 0.00 0 null
699 PURBA BARDHAMAN Galsi - II Durgapur W/S Division KHANO PIPED WATER SUPPLY SCHEME , SM/18313 New New service connection quotation for Khano PWSS TW-2 under DWSD,PHE Dte BILL/00255/2024-2025 BP-2024-25-118 04/02/2025 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED 4.13 0.00 0 null
700 PURBA BARDHAMAN Galsi - II Durgapur W/S Division KHANO PIPED WATER SUPPLY SCHEME , SM/18313 New Formal Work Order for Laying of Rising Main including Jack Pushing and construction of Pipe Carring Bridge with Pipe supporting structure under TAHERPUR and KHANO Piped Water Supply Scheme under Durgapur W/S Division, PHE Dte. Assistant Engineer-II JUNIOR ENGINEER-2 ORD/000158/2024-2025 1506/DWSD 05/11/2024 236 MANASH GHOSH 1,114.23 0.00 0 60
701 PURBA BARDHAMAN Galsi - II Durgapur W/S Division KHANO PIPED WATER SUPPLY SCHEME , SM/18313 New Acceptance cum Formal Work Order for Design Engineering Services of Survey, General arrangement drawing, Pile foundation design and drawings, Pipe Pedestal and BOM, Structural design design and drawing, Fabrication drawings for 26 Numbers different dia meter pipe crossing Pipe Bridge at "PURANGAN (Zone-I, II, III), 11 Nos. Mouzas under PURSHA and UCHCHGRAM, SHILLA (Zone-I, II, III, IV), TAHER PUR (Zone-I, II, III) and KHANO (Zone-I and II) sites under Durgapur W/S Division,PHE Dte. Assistant Engineer-II JUNIOR ENGINEER-2 ORD/000105/2024-2025 1058/DWSD 25/07/2024 270 ASTER CONSULTANCY 47.43 0.00 0 70
702 PURBA BARDHAMAN Galsi - II Central Mechanical KHANO PIPED WATER SUPPLY SCHEME , SM/18313 New Supply, installation, commissioning of Electro-Mechanical and instrumentation components at newly constructed Boosting Station under Taherpur-khano sub surface water supply scheme under Central Mechanical Division PHE Dte. ASSISTANT ENGINEER Junior Engineer ORD/000784/2024-2025 480/CMD 06/02/2025 75 GLACIER ENGINEERING CO 105.71 0.00 0 0
703 PURBA BARDHAMAN Galsi - II Durgapur W/S Division KHANO PIPED WATER SUPPLY SCHEME , SM/18313 New Wayleave permission for Khano W/S Scheme under Eastern railway BILL/00324/2024-2025 BP-2024-25-126 17/03/2025 INDIAN RAILWAY 5.33 0.00 0 null
704 PURBA BARDHAMAN Galsi - II Durgapur W/S Division KHANO PIPED WATER SUPPLY SCHEME , SM/18313 New Wayleave permission for Khano W/S Scheme under Eastern railway BILL/00323/2024-2025 BP-2024-25-125 17/03/2025 INDIAN RAILWAY 5.43 0.00 0 null
705 PURBA BARDHAMAN Galsi - II Burdwan Division KHANO PIPED WATER SUPPLY SCHEME , SM/18313 New Sub Surface Based Piped Water Supply Scheme with LDS, FHTC, Construction of different capacity RCC OHRs with 20.0 mtr. with Staging height including soil investigation, Construction of CWR, Chlorine Room, Guard Room, Sub Station Building, High Lift Pump House Boundary walls with gates, land development, drain and internal pathway of KHANO Piped Water Supply Scheme under Galsi-II Block, District:- Purba-Bardhaman [NEW SCHEME]_2ND CALL ORD/000496/2023-2024 3526/BWD 10/08/2023 820 MEGHDOOT GHOSH 1,088.86 0.00 0 50
706 PURBA BARDHAMAN Galsi - II Durgapur W/S Division KHANO PIPED WATER SUPPLY SCHEME , SM/18313 New Acceptance cum Formal Work Order work oof Sinking of 3 Nos 300 x 200 mm dia T/W 150mtr and Construction of P/H cum switch room chlorine room (4 nos) under KHANO PWSS (JJM), Block- Galsi-II, Dist:- Purba Bardhaman. Assistant Engineer-I,Assistant Engineer-II JUNIOR ENGINEER-2 ORD/000308/2023-2024 371/DWSD 15/03/2024 455 MEGHDOOT GHOSH 80.19 0.00 0 40
707 PURBA BARDHAMAN Galsi - II Central Mechanical KHANO PIPED WATER SUPPLY SCHEME , SM/18313 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Zone-1 & 2, T.W. No.- 1 & 2 at KHANO Water Supply Scheme [ BLOCK- Galsi-II ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. Driller In-Charge JUNIOR ENGINEER ORD/000559/2024-2025 3089/CMD 10/12/2024 236 M.S. ENTERPRISE 50.29 0.00 0 24
708 PURBA BARDHAMAN Galsi - II Central Mechanical KHANO PIPED WATER SUPPLY SCHEME , SM/18313 New Providing Mechanical/Electrical equipment with all ancillaries and auxiliaries including intake (Low lift) pumping machineries, High Lift pumping machineries, 0-1 kg/hour gaseous chlorination system and illumination arrangement of Taherpur & Khano Sub-Surface Based Piped Water Supply Scheme under Purba Bardhaman District PHE Dte. ASSISTANT ENGINEER Junior Engineer ORD/000002/2025-2026 904/CMD 04/04/2025 75 SINHA ELECTRICALS 329.09 0.00 0 0
709 PURBA BARDHAMAN Galsi - II Durgapur W/S Division KHANO PIPED WATER SUPPLY SCHEME , SM/18313 New Wayleave permission for Khano W/S Scheme under Eastern railway Howrah Division BILL/00046/2025-2026 null 17/04/2025 INDIAN RAILWAY 5.26 0.00 0 null
710 PURBA BARDHAMAN Purbasthali - I Burdwan Division NAMA BHANDARITURI PIPED WATER SUPPLY SCHEME , SM/14917 New Material Requisition To Resource Division RTOR000349/2023-2024 2197/BWD 12/05/2023 Resource Division 8.77 0.00 0 0
711 PURBA BARDHAMAN Purbasthali - I Burdwan Division NAMA BHANDARITURI PIPED WATER SUPPLY SCHEME , SM/14917 New Material Requisition To Resource Division RTOR000509/2023-2024 4033/BWD 08/09/2023 Resource Division 0.33 0.00 0 0
712 PURBA BARDHAMAN Purbasthali - I Burdwan Division NAMA BHANDARITURI PIPED WATER SUPPLY SCHEME , SM/14917 New Material Requisition To Resource Division RTOR000805/2023-2024 304/BWD 24/01/2024 Resource Division 3.84 0.00 0 0
713 PURBA BARDHAMAN Purbasthali - I Central Mechanical NAMA BHANDARITURI PIPED WATER SUPPLY SCHEME , SM/14917 New New service connection for Nama Bhandartikuri W/S Scheme. BILL/02190/2023-2024 BP-2023-24-385 16/01/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 4.19 0.00 0 0
714 PURBA BARDHAMAN Purbasthali - I Central Mechanical NAMA BHANDARITURI PIPED WATER SUPPLY SCHEME , SM/14917 New Supply & Installation of Submersible Pumping Machinery , Voltage Stabilizer, Chlorination system and internal House wiring for Tube well no.- 1 & 2 at NAMA BHANDARITURI Water Supply Scheme [Block - PURBASTHALI-1] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000830/2023-2024 4107/CMD 29/08/2023 30 B.P. TRADING CORPORATION 20.79 0.00 0 60
715 PURBA BARDHAMAN Purbasthali - I Burdwan Division NAMA BHANDARITURI PIPED WATER SUPPLY SCHEME , SM/14917 New Different works related (sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of different capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site) to NAMA BHANDARITURI, SAHAPUR & MOUDANGA Piped Water Supply Scheme under PURBASTHALI-I Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000511/2023-2024 3689/BWD 23/08/2023 770 THE MAHADEV CONSTRUCTION 734.18 0.00 0 50
716 PURBA BARDHAMAN Purbasthali - I Central Mechanical NAMA BHANDARITURI PIPED WATER SUPPLY SCHEME , SM/14917 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Manganpur & others water supply scheme under Purbasthali 1 Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000714/2024-2025 2979/CMD 25/11/2024 90 H.K. DAS & CO. 53.27 0.00 0 0
717 PURBA BARDHAMAN Purbasthali - I Burdwan Division NAMA BHANDARITURI PIPED WATER SUPPLY SCHEME , SM/14917 New Different types of works involve in connection with Augmentation of SAJIARA (SM/09716), NAMA BHANDARTIKURI (SM/14917) Piped water supply scheme under Purbasthali-II Block, Kalna Sub-Division, PHE Dte. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000394/2024-2025 3010/BWD 02/08/2024 240 PRATIMA CONSTRUCTION 79.16 0.00 0 2
718 PURBA BARDHAMAN Galsi - II Burdwan Division MOHANPUR PIPED WATER SUPPLY SCHEME , SM/18242 New Material Requisition To Resource Division RTOR000343/2023-2024 2197/BWD 12/05/2023 Resource Division 2.41 0.00 0 0
719 PURBA BARDHAMAN Galsi - II Burdwan Division MOHANPUR PIPED WATER SUPPLY SCHEME , SM/18242 New Material Requisition To Resource Division RTOR000446/2023-2024 3844/BWD 01/09/2023 Resource Division 251.04 0.00 0 0
720 PURBA BARDHAMAN Galsi - II Burdwan Division MOHANPUR PIPED WATER SUPPLY SCHEME , SM/18242 New Material Requisition To Resource Division RTOR000563/2023-2024 4937/BWD 10/11/2023 Resource Division 54.72 0.00 0 0
721 PURBA BARDHAMAN Galsi - II Burdwan Division MOHANPUR PIPED WATER SUPPLY SCHEME , SM/18242 New Shifting of 11KV Line of Mohanpur PWSS under Burdwan Division, PHE Dte. BILL/01080/2023-2024 1055/JJM 13/12/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LTD. 2.33 0.00 0 0
722 PURBA BARDHAMAN Galsi - II Central Mechanical MOHANPUR PIPED WATER SUPPLY SCHEME , SM/18242 New New service connection for Mohanpur PWSS . BILL/02410/2023-2024 BP-2023-24-507 06/02/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.83 0.00 0 0
723 PURBA BARDHAMAN Galsi - II Central Mechanical MOHANPUR PIPED WATER SUPPLY SCHEME , SM/18242 New New service connection for Mohanpur PWSS . BILL/02408/2023-2024 BP-2023-24-506 06/02/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.86 0.00 0 0
724 PURBA BARDHAMAN Galsi - II Burdwan Division MOHANPUR PIPED WATER SUPPLY SCHEME , SM/18242 New MOHANPUR Piped Water Supply Scheme with sinking of Tube-well, LDS, Rising Main, FHTC, Construction of 600 cum capacity RCC OHR with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drain and internal pathway at different TW site under Galsi-II Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer2, Durgapur Sub-Division, PHE Dte. ORD/000386/2023-2024 3149/BWD 20/07/2023 365 MD HASIN 963.53 262.32 27.22 10
725 PURBA BARDHAMAN Galsi - II Central Mechanical MOHANPUR PIPED WATER SUPPLY SCHEME , SM/18242 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1, 2 & 3 at MOHANPUR Water Supply Scheme [ Block- GALSI-2 ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. Driller In-Charge JUNIOR ENGINEER ORD/000792/2023-2024 4080/CMD 29/08/2023 30 CHOUDHURY ENTERPRISE 41.63 0.00 0 96
726 PURBA BARDHAMAN Galsi - II Central Mechanical MOHANPUR PIPED WATER SUPPLY SCHEME , SM/18242 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Satinandi,Sanko & others water supply scheme under Galsi-1 Block ; Serpur, Uchalan & others water supply scheme under Raina-2 Block and maro, loapur & others water supply scheme under Galsi-2 block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000397/2024-2025 2751/CMD 24/09/2024 90 ORIENTAL ENGINEERING CO. 88.42 0.00 0 0
727 PURBA BARDHAMAN Galsi - II Durgapur W/S Division MOHANPUR PIPED WATER SUPPLY SCHEME , SM/18242 New Material Requisition To Resource Division RTOR000002/2024-2025 1724/N/DWSD 10/12/2024 Resource Division 11.33 0.00 0 0
728 PURBA BARDHAMAN Galsi - II Durgapur W/S Division MOHANPUR PIPED WATER SUPPLY SCHEME , SM/18242 New FORMAL WORK ORDER FOR MOHANPUR Piped Water Supply Scheme with Inter-connection, LDS, FHTC ,Road restoration & construction of switch rooms & boundary walls with gates, land development with road at TW site under Galsi-II Block, District:- Purba-Bardhaman under Durgapur W/S Division, PHE Dte Assistant Engineer-II Contractual Junior Engineer_4 ORD/000220/2024-2025 41/DWSD 08/01/2025 120 MD.HASIN 148.94 0.00 0 0
729 PURBA BARDHAMAN Galsi - II Central Mechanical MOHANPUR PIPED WATER SUPPLY SCHEME , SM/18242 New Quotation for new service connection at Mohanpur PWSS TW-3. BILL/01240/2024-2025 BP-2024-25-421 09/01/2025 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.31 0.00 0 0
730 PURBA BARDHAMAN Galsi - II Durgapur W/S Division MOHANPUR PIPED WATER SUPPLY SCHEME , SM/18242 New Material Requisition To Resource Division RTOR000040/2024-2025 460/DWSD 17/03/2025 Resource Division 0.21 0.00 0 0
731 PURBA BARDHAMAN Galsi - II Burdwan Division TAHERPUR PIPED WATER SUPPLY SCHEME , SM/18478 New Material Requisition To Resource Division RTOR000329/2023-2024 2197/BWD 12/05/2023 Resource Division 55.90 0.00 0 0
732 PURBA BARDHAMAN Galsi - II Burdwan Division TAHERPUR PIPED WATER SUPPLY SCHEME , SM/18478 New Material Requisition To Resource Division RTOR000400/2023-2024 3831/BWD 01/09/2023 Resource Division 269.94 0.00 0 0
733 PURBA BARDHAMAN Galsi - II Durgapur W/S Division TAHERPUR PIPED WATER SUPPLY SCHEME , SM/18478 New Formal Work Order for the work of " Sinking of 3 nos. 300 x 200 mm dia T/W- 150 mtr and 7 nos 200 x 200 mm dia River Bank T/W- 51 mtr with Construction of P/H cum switch room under Taherpur PWSS (JJM) Block- Galsi-II, Dist- Purba Bardhaman under Durgapur W/S Division, PHE Dte. Assistant Engineer-II JUNIOR ENGINEER-1 ORD/000317/2023-2024 377/DWSD 15/03/2024 90 S & P ENTERPRISE 0.00 0.00 NAN 0
734 PURBA BARDHAMAN Galsi - II Central Mechanical TAHERPUR PIPED WATER SUPPLY SCHEME , SM/18478 New Quotation for new service connection for Taherpur PWSS TW - 2 (Z-I) BILL/00296/2024-2025 BP-2024-25-146 19/06/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 4.26 0.00 0 0
735 PURBA BARDHAMAN Galsi - II Durgapur W/S Division TAHERPUR PIPED WATER SUPPLY SCHEME , SM/18478 New Acceptance cum Formal Work Order for the work of Trial bore with necessary allied work and supply and delivery of office furnitures for the new office setup of the EE/DWSD/PHE Dte. at Nababhat,Purba bardhaman.in connection with Taherpur W/S Scheme under Durgapur Water Supply Division, PHE Dte. Assistant Engineer-II JUNIOR ENGINEER-2 ORD/000038/2024-2025 750/DWSD 05/06/2024 90 K.M. ENTERPRISE 3.83 0.00 0 100
736 PURBA BARDHAMAN Galsi - II Durgapur W/S Division TAHERPUR PIPED WATER SUPPLY SCHEME , SM/18478 New Acceptance cum Formal Work Order for the work of " Construction of Additional Store Room at Nababhat Office Building under Galsi-II Pipe Water Supply Scheme (JJM) under Durgapur W/S Division, PHE Dte Assistant Engineer-II JUNIOR ENGINEER-2 ORD/000046/2024-2025 764/DWSD 06/06/2024 90 KIRON ENTERPRISE 17.08 0.00 0 30
737 PURBA BARDHAMAN Galsi - II Burdwan Division TAHERPUR PIPED WATER SUPPLY SCHEME , SM/18478 New Hydro-geological study of Sub Surface Water Flow/Storage Characteristics for Creation of Sustainable Source and Estimation of Sustainable Yield (5 Nos of Schemes) in Purba Bardhaman District, West Bengal towards implementation of water supply project. ORD/000872/2023-2024 5324/BWD 01/12/2023 120 THE REGISTRAR JADAVPUR UNIVERSITY 113.34 0.00 0 100
738 PURBA BARDHAMAN Galsi - II Durgapur W/S Division TAHERPUR PIPED WATER SUPPLY SCHEME , SM/18478 New Formal Work Order for Additional Work of Soil investigation and construction of CWR cum Pump House with M.S structural work, Substation, Chlorine Room etc. Land Development of H/W site, drain and internal path way, concrete road and Bituminous Road Restoration, laying of M.S pipe, FHTC with platfrom and necessary allied works of Sub Surface based Taherpur and Khano PWSS (JJM) under Galsi-II Block, Dist- Purba Bardhaman, under Durgapur W/S Division, PHE Dte. Assistant Engineer-II JUNIOR ENGINEER-2 ORD/000161/2024-2025 1507/DWSD 05/11/2024 180 S & P ENTERPRISE 811.59 0.00 0 0
739 PURBA BARDHAMAN Galsi - II Central Mechanical TAHERPUR PIPED WATER SUPPLY SCHEME , SM/18478 New Quotation for new service connection at Taherpur PWSS TW-3 BILL/01092/2024-2025 BP-2024-25-404 22/11/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 9.08 0.00 0 0
740 PURBA BARDHAMAN Galsi - II Central Mechanical TAHERPUR PIPED WATER SUPPLY SCHEME , SM/18478 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for OHR SITE of Zone-1, 2, & 3 at TAHERPUR Water Supply Scheme [ BLOCK- Galsi-II ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. Driller In-Charge JUNIOR ENGINEER ORD/000560/2024-2025 3102/CMD 11/12/2024 60 M/S, S.S. ENTERPRISE. 38.16 0.00 0 0
741 PURBA BARDHAMAN Galsi - II Durgapur W/S Division TAHERPUR PIPED WATER SUPPLY SCHEME , SM/18478 New Formal Work Order for Laying of Rising Main including Jack Pushing and construction of Pipe Carring Bridge with Pipe supporting structure under TAHERPUR and KHANO Piped Water Supply Scheme under Durgapur W/S Division, PHE Dte. Assistant Engineer-II JUNIOR ENGINEER-2 ORD/000158/2024-2025 1506/DWSD 05/11/2024 236 MANASH GHOSH 1,114.23 0.00 0 60
742 PURBA BARDHAMAN Galsi - II Durgapur W/S Division TAHERPUR PIPED WATER SUPPLY SCHEME , SM/18478 New Acceptance cum Formal Work Order for Preparation and Submission of Structural Design Calculation (Civil) & Structural drawing of Proposed CWR with M.S Structural Pump House over cwr, WBSEDCL Mettering Room and - PDB Room -2 Nos, Transformer yeard -2 nos, Chlorin Room -1 No with General Arrangement Drawing of Internal Road - Drain & necessary Soil investigation at Intake Site of "THERPUR (Zone-I, II, III) and KHANO (Zone I & II) PWSS (6 Copy) under Durgapur W/s Division, PHE Dte. Assistant Engineer-II JUNIOR ENGINEER-2 ORD/000192/2024-2025 1608/DWSD 26/11/2024 45 DAFFODIL 9.48 0.00 0 90
743 PURBA BARDHAMAN Galsi - II Central Mechanical TAHERPUR PIPED WATER SUPPLY SCHEME , SM/18478 New Supply, installation, commissioning of Electro-Mechanical and instrumentation components at newly constructed Boosting Station under Taherpur-khano sub surface water supply scheme under Central Mechanical Division PHE Dte. ASSISTANT ENGINEER Junior Engineer ORD/000784/2024-2025 480/CMD 06/02/2025 75 GLACIER ENGINEERING CO 105.71 0.00 0 0
744 PURBA BARDHAMAN Galsi - II Burdwan Division TAHERPUR PIPED WATER SUPPLY SCHEME , SM/18478 New Sub Surface Based Piped Water Supply Scheme with LDS, FHTC, Construction of different capacity RCC OHRs with 20.0 mtr. with Staging height including soil investigation, Construction of CWR, Chlorine Room, Guard Room, Sub Station Building, High Lift Pump House Boundary walls with gates, land development, drain and internal pathway of TAHERPUR Piped Water Supply Scheme under Galsi-II Block, District:- Purba-Bardhaman [NEW SCHEME] ORD/000479/2023-2024 3760/BWD 29/08/2023 730 S & P ENTERPRISE 2,282.69 0.00 0 50
745 PURBA BARDHAMAN Galsi - II Durgapur W/S Division TAHERPUR PIPED WATER SUPPLY SCHEME , SM/18478 New Formal Work Order for the work of Sinking of 3 nos 300 x 200mm dia Tube Well-150 mtr and 7 Nos 200 x 200 mm dia River Bank Tube Well- 51 mtr with Construction of Pump House Cum Switch Room Chlorine Room under TAHERPUR PWSS (JJM) Block- Galsi-II, Distric- Purba Bardhaman under Durgapur W/S Division, PHE Dte Assistant Engineer-II JUNIOR ENGINEER-2 ORD/000093/2024-2025 1000/DWSD 11/07/2024 340 S & P ENTERPRISE 102.54 0.00 0 60
746 PURBA BARDHAMAN Galsi - II Central Mechanical TAHERPUR PIPED WATER SUPPLY SCHEME , SM/18478 New Providing Mechanical/Electrical equipment with all ancillaries and auxiliaries including intake (Low lift) pumping machineries, High Lift pumping machineries, 0-1 kg/hour gaseous chlorination system and illumination arrangement of Taherpur & Khano Sub-Surface Based Piped Water Supply Scheme under Purba Bardhaman District PHE Dte. ASSISTANT ENGINEER Junior Engineer ORD/000002/2025-2026 904/CMD 04/04/2025 75 SINHA ELECTRICALS 329.09 0.00 0 0
747 PURBA BARDHAMAN Galsi - II Durgapur W/S Division TAHERPUR PIPED WATER SUPPLY SCHEME , SM/18478 New Additional quotation for effecting NSC at Pump house at Taherpur (Shikarpur) PWSS (Zone-II) BILL/00339/2024-2025 BP-2024-25-152 27/03/2025 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED 7.80 0.00 0 null
748 PURBA BARDHAMAN Katwa - I Burdwan Division NANAGAR PIPED WATER SUPPLY SCHEME , SM/18479 New Material Requisition To Resource Division RTOR000350/2023-2024 2197/BWD 12/05/2023 Resource Division 11.62 0.00 0 0
749 PURBA BARDHAMAN Katwa - I Burdwan Division NANAGAR PIPED WATER SUPPLY SCHEME , SM/18479 New Material Requisition To Resource Division RTOR000561/2023-2024 4935/BWD 10/11/2023 Resource Division 56.21 0.00 0 0
750 PURBA BARDHAMAN Katwa - I Central Mechanical NANAGAR PIPED WATER SUPPLY SCHEME , SM/18479 New New service connection for NANAGAR PWSS PH-1. BILL/02285/2023-2024 BP-2023-24-416 19/01/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 2.83 0.00 0 0
751 PURBA BARDHAMAN Katwa - I Central Mechanical NANAGAR PIPED WATER SUPPLY SCHEME , SM/18479 New ADDITIONAL QUOTATION NEW SERVICE CONNECTION FOR NANAGAR PWSS TW -1. BILL/03104/2023-2024 BP-2023-24-644 15/03/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 1.02 0.00 0 0
752 PURBA BARDHAMAN Katwa - I Central Mechanical NANAGAR PIPED WATER SUPPLY SCHEME , SM/18479 New NEW SERVICE CONNECTION FOR NANAGAR PWSS TW-2 BILL/00130/2024-2025 BP-2024-25-59 26/04/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 8.11 0.00 0 0
753 PURBA BARDHAMAN Katwa - I Central Mechanical NANAGAR PIPED WATER SUPPLY SCHEME , SM/18479 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Jajigram & others water supply scheme under Katwa-I Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman Driller In-Charge Junior Engineer ORD/000069/2024-2025 2399/CMD 02/08/2024 90 SUBRATA BHADRA 55.16 0.00 0 0
754 PURBA BARDHAMAN Katwa - I Central Mechanical NANAGAR PIPED WATER SUPPLY SCHEME , SM/18479 New Second time additional quotation for Nanagar PWSS TW-1 BILL/00665/2024-2025 BP-2024-25-267 20/08/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 0.34 0.00 0 0
755 PURBA BARDHAMAN Katwa - I Burdwan Division NANAGAR PIPED WATER SUPPLY SCHEME , SM/18479 New Balance work of OHR, construction Concrete Road, Functional Household Tap Connection, Road restoration etc. for Nanagar PWSS, Srikhanda PWSS, under KATWA -I Block under Katwa Sub-Divn under Burdwan Division, PHE Dte. District:- Purba-Bardhaman. Assistant Engineer ORD/000685/2024-2025 3655/BWD 21/10/2024 120 HAMID SK 121.69 0.00 0 0
756 PURBA BARDHAMAN Katwa - I Central Mechanical NANAGAR PIPED WATER SUPPLY SCHEME , SM/18479 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1, 2 & 3 at NANAGAR Water Supply Scheme [ Block- KATWA-1 ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. Driller In-Charge Junior Engineer ORD/000878/2023-2024 4141/CMD 29/08/2023 30 S.P. CONSTRUCTION 44.39 0.00 0 30
757 PURBA BARDHAMAN Katwa - I Burdwan Division NANAGAR PIPED WATER SUPPLY SCHEME , SM/18479 New Material Requisition To Resource Division RTOR000047/2024-2025 327/BWD 15/01/2025 Resource Division 5.83 0.00 0 0
758 PURBA BARDHAMAN Katwa - I Burdwan Division NANAGAR PIPED WATER SUPPLY SCHEME , SM/18479 New NANAGAR Piped Water Supply Scheme with sinking of Tube-well, LDS, Rising Main, FHTC, Construction of 400 cum capacity RCC OHR with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drain and internal pathway at different TW site under Katwa-I Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer Junior Engineer, R.W.S., Katwa-I Dev. Block ORD/000490/2023-2024 3507/BWD 10/08/2023 365 GUPTA ENTERPRISE 660.65 26.22 3.97 55
759 PURBA BARDHAMAN Katwa - I Burdwan Division KHAJURDIHI PIPE WATER SUPPLY SCHEME , SM/18484 New Material Requisition To Resource Division RTOR000377/2023-2024 2197/BWD 12/05/2023 Resource Division 16.74 0.00 0 0
760 PURBA BARDHAMAN Katwa - I Burdwan Division KHAJURDIHI PIPE WATER SUPPLY SCHEME , SM/18484 New Material Requisition To Resource Division RTOR000404/2023-2024 3828/BWD 01/09/2023 Resource Division 96.08 0.00 0 0
761 PURBA BARDHAMAN Katwa - I Central Mechanical KHAJURDIHI PIPE WATER SUPPLY SCHEME , SM/18484 New New Service Connection for KHAJURDIHI PWSS PH-1. BILL/02284/2023-2024 BP-2023-24-418 19/01/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 2.80 0.00 0 0
762 PURBA BARDHAMAN Katwa - I Central Mechanical KHAJURDIHI PIPE WATER SUPPLY SCHEME , SM/18484 New New service connection for Khajurdhi, PWSS PH-2. BILL/02286/2023-2024 BP-2023-24-419 19/01/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 2.81 0.00 0 0
763 PURBA BARDHAMAN Katwa - I Central Mechanical KHAJURDIHI PIPE WATER SUPPLY SCHEME , SM/18484 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Jajigram & others water supply scheme under Katwa-I Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman Driller In-Charge Junior Engineer ORD/000069/2024-2025 2399/CMD 02/08/2024 90 SUBRATA BHADRA 55.16 0.00 0 0
764 PURBA BARDHAMAN Katwa - I Central Mechanical KHAJURDIHI PIPE WATER SUPPLY SCHEME , SM/18484 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1, 2 & 3 at KHAJURDIHI Water Supply Scheme [ Block- KATWA-1 ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. Driller In-Charge Junior Engineer ORD/000879/2023-2024 4142/CMD 29/08/2023 30 S.P. CONSTRUCTION 44.39 0.00 0 45
765 PURBA BARDHAMAN Katwa - I Central Mechanical KHAJURDIHI PIPE WATER SUPPLY SCHEME , SM/18484 New Addl. quotation for Khajurdihi PWSS TW-2 BILL/00830/2024-2025 BP-2024-25-326 03/10/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 0.99 0.00 0 0
766 PURBA BARDHAMAN Katwa - I Burdwan Division KHAJURDIHI PIPE WATER SUPPLY SCHEME , SM/18484 New Material Requisition To Resource Division RTOR000035/2024-2025 315/BWD 15/01/2025 Resource Division 2.56 0.00 0 0
767 PURBA BARDHAMAN Katwa - I Burdwan Division KHAJURDIHI PIPE WATER SUPPLY SCHEME , SM/18484 New KHAJURDIHI Piped Water Supply Scheme with sinking of Tube-well, LDS, Rising Main, FHTC, Construction of 400 cum capacity RCC OHR with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drain and internal pathway at different TW site under Katwa-I Block, District:- Purba-Bardhaman [NEW SCHEME]_2ND CALL Assistant Engineer Junior Engineer, R.W.S., Katwa-I Dev. Block ORD/000497/2023-2024 3527/BWD 10/08/2023 792 MONDAL ENTERPRISE 570.77 106.42 18.64 67
768 PURBA BARDHAMAN Katwa - I Burdwan Division KHAJURDIHI PIPE WATER SUPPLY SCHEME , SM/18484 New Connection pipeline KHAJURDIHI Piped W/S. Scheme under Katwa-I Block under Katwa Sub-Division within Burdwan Division PHE Dte. Assistant Engineer Junior Engineer, R.W.S., Katwa-I Dev. Block ORD/000320/2024-2025 2856/BWD 22/07/2024 120 D.M. ENTERPRISE 83.94 0.00 0 97
769 PURBA BARDHAMAN Katwa - I Central Mechanical KHAJURDIHI PIPE WATER SUPPLY SCHEME , SM/18484 New Quotation for new connection at Khajurdihi PWSS TW 3 BILL/01335/2024-2025 BP-2024-25-430 31/01/2025 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.35 0.00 0 null
770 PURBA BARDHAMAN Katwa - I Burdwan Division KHAJURDIHI PIPE WATER SUPPLY SCHEME , SM/18484 New Different work for Khajurdihi PWSS Khajurdihi and Bera mouza with boundary wall, land development, plinth protection for pump house & OHR under KHAJURDIHI PWSS, at Katwa -I Block under Katwa Sub Division under Burdwan Division PHE Dte. Assistant Engineer ORD/001190/2024-2025 610/BWD 11/02/2025 120 MONDAL ENTERPRISE 196.33 0.00 0 0
771 PURBA BARDHAMAN Katwa - I Burdwan Division KHAJURDIHI PIPE WATER SUPPLY SCHEME , SM/18484 New Necessary restoration work of Khajurdihi PWSS under Katwa-I Block under Katwa Sub-Division Burdwan Division PHE Dte. (Sl no -06) Assistant Engineer Junior Engineer, R.W.S., Katwa-I Dev. Block ORD/001053/2024-2025 1609-A/KTS 14/11/2024 45 D.M. ENTERPRISE 0.97 0.00 0 100
772 PURBA BARDHAMAN Katwa - I Burdwan Division KHAJURDIHI PIPE WATER SUPPLY SCHEME , SM/18484 New Emergent road restoration work due to laying of 225 mm dia. & 90 mm dia. HDPE Pipe line from Khajurdihi Bazar to Khajurdihi football play ground in connection with Khajurdihi PWSS (SM/18484) under Katwa-I Block under Katwa Sub-Division within Burdwan Division PHE Dte. Assistant Engineer Junior Engineer, R.W.S., Katwa-I Dev. Block ORD/001047/2024-2025 219/BWD 10/01/2025 21 D.M. ENTERPRISE 9.00 0.00 0 100
773 PURBA BARDHAMAN Katwa - I Burdwan Division GIDHGRAM PIPED WATER SUPPLY SCHEME , SM/18485 New Material Requisition To Resource Division RTOR000265/2023-2024 2197/BWD 12/05/2023 Resource Division 16.31 0.00 0 0
774 PURBA BARDHAMAN Katwa - I Burdwan Division GIDHGRAM PIPED WATER SUPPLY SCHEME , SM/18485 New Material Requisition To Resource Division RTOR000491/2023-2024 4015/BWD 08/09/2023 Resource Division 74.64 0.00 0 0
775 PURBA BARDHAMAN Katwa - I Central Mechanical GIDHGRAM PIPED WATER SUPPLY SCHEME , SM/18485 New New service connection for Gidhagram PWSS PH-3 BILL/02283/2023-2024 BP-2023-24-420 19/01/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.90 0.00 0 0
776 PURBA BARDHAMAN Katwa - I Central Mechanical GIDHGRAM PIPED WATER SUPPLY SCHEME , SM/18485 New NEW SERVICE CONNECTION FOR GIDHGRAM PWSS TW 2. BILL/02488/2023-2024 BP-2023-24-534 15/02/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 5.91 0.00 0 0
777 PURBA BARDHAMAN Katwa - I Central Mechanical GIDHGRAM PIPED WATER SUPPLY SCHEME , SM/18485 New NEW SERVICE CONNECTION FOR GIDHGRAM PWSS TW 1 BILL/02955/2023-2024 BP-2023-24-635 15/03/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.48 0.00 0 0
778 PURBA BARDHAMAN Katwa - I Central Mechanical GIDHGRAM PIPED WATER SUPPLY SCHEME , SM/18485 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Jajigram & others water supply scheme under Katwa-I Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman Driller In-Charge Junior Engineer ORD/000069/2024-2025 2399/CMD 02/08/2024 90 SUBRATA BHADRA 55.16 0.00 0 0
779 PURBA BARDHAMAN Katwa - I Burdwan Division GIDHGRAM PIPED WATER SUPPLY SCHEME , SM/18485 New Balance work for Balance work of OHR, construction Concrete Road, 1st Floor of Office Building, Functional Household Tap Connection, land development, Road restoration etc. of Gopekhanji, Jajigram & Gidhagram PWSS under KATWA -I Block, under Katwa Sub Division under Burdwan Divn, District:- Purba-Bardhaman. Assistant Engineer ORD/000503/2024-2025 3161/BWD 22/08/2024 120 POWER TOOLS & ENGINEERING 272.54 0.00 0 0
780 PURBA BARDHAMAN Katwa - I Burdwan Division GIDHGRAM PIPED WATER SUPPLY SCHEME , SM/18485 New GIDHGRAM Piped Water Supply Scheme with sinking of Tube-well, LDS, Rising Main, FHTC, Construction of 500cum capacity RCC OHR with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drain and internal pathway at different TW site under Katwa-I Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer JUNIOR ENGINEER KATWA SUB-DIVISION PHE DTE,Junior Engineer, R.W.S., Katwa-I Dev. Block ORD/000453/2023-2024 3431/BWD 07/08/2023 365 POWER TOOLS & ENGINEERING 671.42 82.89 12.35 31
781 PURBA BARDHAMAN Katwa - I Central Mechanical GIDHGRAM PIPED WATER SUPPLY SCHEME , SM/18485 New Quotation for new service connection at Gidhgram PWSS TW 3. BILL/01223/2024-2025 BP-2024-25-413 16/12/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 0.54 0.00 0 0
782 PURBA BARDHAMAN Katwa - I Burdwan Division GIDHGRAM PIPED WATER SUPPLY SCHEME , SM/18485 New Material Requisition To Resource Division RTOR000079/2024-2025 405/BWD 17/01/2025 Resource Division 4.08 0.00 0 0
783 PURBA BARDHAMAN Katwa - I Central Mechanical GIDHGRAM PIPED WATER SUPPLY SCHEME , SM/18485 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1, 2 & 3 at GIDHGRAM Water Supply Scheme [ Block-KATWA-1 ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. Driller In-Charge Junior Engineer ORD/000873/2023-2024 4136/CMD 29/08/2023 605 M/S, S.S. ENTERPRISE. 45.53 0.00 0 64
784 PURBA BARDHAMAN Raina - I Burdwan Division BELSHAR PIPED WATER SUPPLY SCHEME , SM/18338 New Material Requisition To Resource Division RTOR000247/2023-2024 2197/BWD 12/05/2023 Resource Division 1.80 0.00 0 0
785 PURBA BARDHAMAN Raina - I Burdwan Division BELSHAR PIPED WATER SUPPLY SCHEME , SM/18338 New Material Requisition To Resource Division RTOR000423/2023-2024 3860/BWD 01/09/2023 Resource Division 3.41 0.00 0 0
786 PURBA BARDHAMAN Raina - I Burdwan Division BELSHAR PIPED WATER SUPPLY SCHEME , SM/18338 New Material Requisition To Resource Division RTOR000654/2023-2024 5100/BWD 23/11/2023 Resource Division 20.46 0.00 0 0
787 PURBA BARDHAMAN Raina - I Central Mechanical BELSHAR PIPED WATER SUPPLY SCHEME , SM/18338 New New electric connection for Belswar PWSS, PH-1. BILL/01872/2023-2024 BP-2023-24-360 11/01/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 9.01 0.00 0 0
788 PURBA BARDHAMAN Raina - I Central Mechanical BELSHAR PIPED WATER SUPPLY SCHEME , SM/18338 New NEW SERVICE CONNECTION FOR BELSHAR PWSS TW 2. BILL/03182/2023-2024 BP-2023-24-666 22/03/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 7.39 0.00 0 0
789 PURBA BARDHAMAN Raina - I Central Mechanical BELSHAR PIPED WATER SUPPLY SCHEME , SM/18338 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Bajitpur, Belsar & other water supply scheme under Raina-1 Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000117/2024-2025 2589/CMD 27/08/2024 90 DEY ENTERPRISE 74.58 0.00 0 0
790 PURBA BARDHAMAN Raina - I Burdwan Division BELSHAR PIPED WATER SUPPLY SCHEME , SM/18338 New Material Requisition To Resource Division RTOR000006/2024-2025 4115/BWD 25/11/2024 Resource Division 21.15 0.00 0 0
791 PURBA BARDHAMAN Raina - I Central Mechanical BELSHAR PIPED WATER SUPPLY SCHEME , SM/18338 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at Belshar Water Supply Scheme [ Block- Raina-1 ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000719/2023-2024 4030/CMD 29/08/2023 474 SINHA ELECTRICALS 28.97 1.62 5.59 96
792 PURBA BARDHAMAN Raina - I Burdwan Division BELSHAR PIPED WATER SUPPLY SCHEME , SM/18338 New Balance work [i.e. Extension or parallel Pipeline, Leftout FHTC, Road Restoration work, Sinking of Additional Tube Well with Pump House & Boundary wall, inter Connection of Additional Tube Well, Construction of M.S.Structural bridge, canal Crossing, MS casing with allied work of Bhagabatipur, Machkhara, Udgara, Bantir, Chakpurohit Rasuikhanda, Sankarpur, Gopalpur & Belshar PWSS Block-RAINA- I under Burdwan Sub Division, PHE Dte. within Burdwan Division PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/001103/2024-2025 469/BWD 24/01/2025 180 SK ALIM 1,353.91 0.00 0 0
793 PURBA BARDHAMAN Raina - I Burdwan Division BELSHAR PIPED WATER SUPPLY SCHEME , SM/18338 New Different works related (sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of different capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site) to BELSHAR & SANKARPUR Piped Water Supply Scheme under Raina ¿ I Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000411/2023-2024 3256/BWD 27/07/2023 644 SK ALIM 1,345.74 55.51 4.12 85
794 PURBA BARDHAMAN Mangolkote Burdwan Division KULSANA PIPE WATER SUPPLY SCHEME , SM/18440 New Material Requisition To Resource Division RTOR000389/2023-2024 2197/BWD 12/05/2023 Resource Division 1.75 0.00 0 0
795 PURBA BARDHAMAN Mangolkote Burdwan Division KULSANA PIPE WATER SUPPLY SCHEME , SM/18440 New Material Requisition To Resource Division RTOR000406/2023-2024 3826/BWD 01/09/2023 Resource Division 4.47 0.00 0 0
796 PURBA BARDHAMAN Mangolkote Burdwan Division KULSANA PIPE WATER SUPPLY SCHEME , SM/18440 New Material Requisition To Resource Division RTOR000801/2023-2024 308/BWD 24/01/2024 Resource Division 32.08 0.00 0 0
797 PURBA BARDHAMAN Mangolkote Central Mechanical KULSANA PIPE WATER SUPPLY SCHEME , SM/18440 New Quotation for new service connection at Kulsana PWSS TW-2 BILL/00376/2024-2025 BP-2024-25-186 08/07/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 6.43 0.00 0 0
798 PURBA BARDHAMAN Mangolkote Central Mechanical KULSANA PIPE WATER SUPPLY SCHEME , SM/18440 New QUOTATION FOR NEW SERVICE CONNECTION AT KULSANA PWSS TW-1 BILL/00367/2024-2025 BP-2024-25-187 08/07/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 5.91 0.00 0 0
799 PURBA BARDHAMAN Mangolkote Burdwan Division KULSANA PIPE WATER SUPPLY SCHEME , SM/18440 New Continuation Work Order for Supply of 1 (one) No. Inspection Vehicle for different JJM Related Works as and when required including supply of driver and fuels (Minimum 8 Hours of duty) under Katwa Sub-Division within Burdwan Division, P.H.E. Dte. Consider 96.00 Km run per Day Assistant Engineer JUNIOR ENGINEER KATWA SUB-DIVISION PHE DTE ORD/000107/2024-2025 485/KTS 16/04/2024 72 AJIT SAMANTA 0.92 0.00 0 10
800 PURBA BARDHAMAN Mangolkote Central Mechanical KULSANA PIPE WATER SUPPLY SCHEME , SM/18440 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Jabagram & others water supply scheme under Mangalkote Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. Driller In-Charge Junior Engineer ORD/000118/2024-2025 2590/CMD 27/08/2024 90 M/S SAJAHAN CHOWDHURY 62.06 0.00 0 0
801 PURBA BARDHAMAN Mangolkote Central Drilling KULSANA PIPE WATER SUPPLY SCHEME , SM/18440 New Providing drilling crew and other allied works for construction of Tube Well (250mm X150mm X 240 Mtrs. Depth) by utilizing Departmental Machineries for Kulsana W/S Scheme (T/W-I & II), Block- Mangolkote under Purba Bardhman District, Central Drilling Division, P.H.E. Dte. Assistant Engineer Junior Engineer ORD/000154/2023-2024 1341/CDD 13/09/2023 322 SUNRISE ENGINEERING CORPORATION 23.34 0.00 0 100
802 PURBA BARDHAMAN Mangolkote Burdwan Division KULSANA PIPE WATER SUPPLY SCHEME , SM/18440 New Different works related (sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of different capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site) to CHAKULIA, KULSANA & HALIMPUR Piped Water Supply Scheme under MONGALKOTE Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer J.E. katwa,JUNIOR ENGINEER R.W.S. BURDWAN SUB-DIVISION PHE DTE ORD/000461/2023-2024 3443/BWD 08/08/2023 365 ASHOK KUMAR GHOSH 1,588.10 34.13 2.15 15
803 PURBA BARDHAMAN Mangolkote Burdwan Division KULSANA PIPE WATER SUPPLY SCHEME , SM/18440 New Material Requisition To Resource Division RTOR000007/2024-2025 4099/BWD 25/11/2024 Resource Division 20.51 0.00 0 0
804 PURBA BARDHAMAN Mangolkote Central Mechanical KULSANA PIPE WATER SUPPLY SCHEME , SM/18440 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1, 2 & 3 at KULSANA Water Supply Scheme [ Block-MANGOLKOTE] under CMD, PHE Dte., Dist.- Purba-Bardhaman. Driller In-Charge Junior Engineer ORD/000876/2023-2024 4139/CMD 29/08/2023 640 M/S, S.S. ENTERPRISE. 44.56 0.00 0 43
805 PURBA BARDHAMAN Mangolkote Burdwan Division KULSANA PIPE WATER SUPPLY SCHEME , SM/18440 New Balance work of KULSANA Piped Water Supply Scheme with sinking of Tube-well, LDS, FHTC & construction of switch rooms & boundary walls with gates and land development, drain and internal pathway at different TW site under Mongalkote Block, District:- Purba-Bardhaman. Assistant Engineer ORD/001303/2024-2025 935/BWD 11/03/2025 120 M/S GHOSH CONSTRUCTION 249.53 0.00 0 0
806 PURBA BARDHAMAN Katwa - II Burdwan Division KARUI PIPED WATER SUPPLY SCHEME , SM/18460 New Material Requisition To Resource Division RTOR000316/2023-2024 2197/BWD 12/05/2023 Resource Division 20.46 0.00 0 0
807 PURBA BARDHAMAN Katwa - II Central Mechanical KARUI PIPED WATER SUPPLY SCHEME , SM/18460 New New service connection charges for Karui PWSS TW-2 BILL/00798/2023-2024 BP-2023-24-86 26/07/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 2.67 0.00 0 0
808 PURBA BARDHAMAN Katwa - II Central Mechanical KARUI PIPED WATER SUPPLY SCHEME , SM/18460 New New service connection charges for Karui PWSS TW-1 BILL/00821/2023-2024 BP-2023-24-101 03/08/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.19 0.00 0 0
809 PURBA BARDHAMAN Katwa - II Central Mechanical KARUI PIPED WATER SUPPLY SCHEME , SM/18460 New New service connection charges for Karui PWSS TW-3 BILL/01354/2023-2024 BP-2023-24-132 22/08/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 7.65 0.00 0 0
810 PURBA BARDHAMAN Katwa - II Burdwan Division KARUI PIPED WATER SUPPLY SCHEME , SM/18460 New Material Requisition To Resource Division RTOR000437/2023-2024 3850/BWD 01/09/2023 Resource Division 63.64 0.00 0 0
811 PURBA BARDHAMAN Katwa - II Burdwan Division KARUI PIPED WATER SUPPLY SCHEME , SM/18460 New Material Requisition To Resource Division RTOR000556/2023-2024 4889/BWD 10/11/2023 Resource Division 75.91 0.00 0 0
812 PURBA BARDHAMAN Katwa - II Burdwan Division KARUI PIPED WATER SUPPLY SCHEME , SM/18460 New Material Requisition To Resource Division RTOR000778/2023-2024 326/BWD 24/01/2024 Resource Division 8.78 0.00 0 0
813 PURBA BARDHAMAN Katwa - II Central Mechanical KARUI PIPED WATER SUPPLY SCHEME , SM/18460 New Continuation order for Hiring of Inspection Vehicle (Diesel/CNG/LPG Driven) for supervision of site for the office of The Driller In Charge, Bardhaman Mech, Sub Division ( Drilling) under C.M.D. P.H.E. Dte. w.e.f.-01/11/2023 to 31/12/2023. Driller In-Charge Junior Engineer ORD/001198/2023-2024 159/DIC/BMSD(D) 31/10/2023 61 SUBRATA BHADRA 0.79 0.00 0 100
814 PURBA BARDHAMAN Katwa - II Central Mechanical KARUI PIPED WATER SUPPLY SCHEME , SM/18460 New Hiring of Inspection Vehicle (Diesel/CNG/LPG Driven) for supervision of site for the office of The Driller In Charge, Bardhaman Mech, Sub Division ( Drilling) under C.M.D. P.H.E. Dte. w.e.f.-01/09/2023 to 31/10/2023. Driller In-Charge Junior Engineer ORD/001162/2023-2024 70/DIC/BMSD(D) 28/08/2023 61 SUBRATA BHADRA 0.79 0.00 0 100
815 PURBA BARDHAMAN Katwa - II Central Mechanical KARUI PIPED WATER SUPPLY SCHEME , SM/18460 New Continuation order for hiring of Inspection Vehicle ( Diesel/CNG/LPG Driven) for supervision of site for the office of the Driller In charge, Bardhaman Mechanical Sub Division(Drilling) under CMD, PHE, Dte, Dte. [w.e.f: 01.01.2024 to 29.02.2024] Driller In-Charge Junior Engineer ORD/001697/2023-2024 365/DIC/BMSD(D) 29/12/2023 60 SUBRATA BHADRA 0.78 0.00 0 100
816 PURBA BARDHAMAN Katwa - II Central Mechanical KARUI PIPED WATER SUPPLY SCHEME , SM/18460 New Continuation order for hiring of Inspection Vehicle ( Diesel/CNG/LPG Driven) for supervision of site for the office of the Driller In charge, Bardhaman Mechanical Sub Division(Drilling) under CMD, PHE, Dte, [w.e.f: 01.03.2024 to 30.04.2024] Driller In-Charge Junior Engineer ORD/001726/2023-2024 141/DIC/BMSD(D) 29/02/2024 61 SUBRATA BHADRA 0.79 0.00 0 100
817 PURBA BARDHAMAN Katwa - II Central Mechanical KARUI PIPED WATER SUPPLY SCHEME , SM/18460 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Mulgram & others water supply scheme under Katwa-II Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. ASSISTANT ENGINEER Junior Engineer ORD/000070/2024-2025 2409/CMD 02/08/2024 90 DUTTA ENTERPRISE 50.18 0.00 0 0
818 PURBA BARDHAMAN Katwa - II Central Mechanical KARUI PIPED WATER SUPPLY SCHEME , SM/18460 New Continuation order for hiring of Inspection Vehicle ( Diesel/CNG/LPG Driven) for supervision of site for the office of the Driller In charge, Bardhaman Mechanical Sub Division(Drilling) under CMD, PHE, Dte, [w.e.f.-01/05/2024 to 30/06/2024] Driller In-Charge Junior Engineer ORD/000002/2024-2025 259/DIC/BMSD(D) 26/04/2024 61 SUBRATA BHADRA 0.79 0.00 0 0
819 PURBA BARDHAMAN Katwa - II Central Mechanical KARUI PIPED WATER SUPPLY SCHEME , SM/18460 New Continuation order for hiring of Inspection Vehicle ( Diesel/CNG/LPG Driven) for supervision of site for the office of the Driller In charge, Bardhaman Mechanical Sub Division(Drilling) under CMD, PHE, Dte, [w.e.f: 01.07.2024 to 31.08.2024] Driller In-Charge Junior Engineer ORD/000053/2024-2025 350/DIC/BMSD(D) 27/06/2024 62 SUBRATA BHADRA 0.79 0.00 0 0
820 PURBA BARDHAMAN Katwa - II Burdwan Division KARUI PIPED WATER SUPPLY SCHEME , SM/18460 New Different works related (sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of different capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site) to MEJHIARY & KARUI Piped Water Supply Scheme under Katwa ¿ II Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer JUNIOR ENGINEER KATWA SUB-DIVISION PHE DTE ORD/000421/2023-2024 3291/BWD 31/07/2023 365 M/S S. CHOUDHURY 1,294.79 244.77 18.9 64
821 PURBA BARDHAMAN Katwa - II Central Mechanical KARUI PIPED WATER SUPPLY SCHEME , SM/18460 New Supply and installation of Electro-Magnetic flow meter at AURIA, KARUI & others water supply scheme under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. Driller In-Charge JUNIOR ENGINEER ORD/000602/2024-2025 3106/CMD 11/12/2024 60 S.K. ELECTRICALS 13.60 0.00 0 0
822 PURBA BARDHAMAN Katwa - II Central Mechanical KARUI PIPED WATER SUPPLY SCHEME , SM/18460 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1, 2 & 3 at KARUI Water Supply Scheme [ Block- KATWA-2 ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. Driller In-Charge Junior Engineer ORD/000215/2023-2024 3099/CMD 24/07/2023 550 JAL PRAVAHIKA PVT LTD 44.40 13.45 30.29 91
823 PURBA BARDHAMAN Katwa - II Burdwan Division KARUI PIPED WATER SUPPLY SCHEME , SM/18460 New Material Requisition To Resource Division RTOR000051/2024-2025 331/BWD 15/01/2025 Resource Division 1.24 0.00 0 0
824 PURBA BARDHAMAN Katwa - II Burdwan Division KARUI PIPED WATER SUPPLY SCHEME , SM/18460 New Construction of Toilet (1.8 m x 1.8 m) with sanitary arrangement under KARUI PWSS (SM/18460) 3rd Tube Well Site under Katwa Sub-Division under Burdwan Division PHE Dte. (Sl No-04) ORD/001265/2024-2025 345/KTS 05/03/2025 30 JAMALUDDIN SK 2.46 0.00 0 0
825 PURBA BARDHAMAN Katwa - II Burdwan Division KARUI PIPED WATER SUPPLY SCHEME , SM/18460 New Construction of Toilet (1.8 m x 1.8 m) with sanitary arrangement under KARUI PWSS (SM/18460) 2nd Tube Well Site under Katwa Sub-Division under Burdwan Division PHE Dte. (Sl No-3) ORD/001264/2024-2025 344/KTS 05/03/2025 30 JAMALUDDIN SK 2.46 0.00 0 0
826 PURBA BARDHAMAN Katwa - II Burdwan Division KARUI PIPED WATER SUPPLY SCHEME , SM/18460 New Different types of works involve in connection with implementation of Aug. Mongalkote, Palishgram, Purba Nowapara, Sitahati, Singhi, Mejhiary & Karui Piped Water Supply Scheme within Katwa Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer ORD/001191/2024-2025 873/BWD 06/03/2025 180 M/S S. CHOUDHURY 588.22 0.00 0 0
827 PURBA BARDHAMAN Burdwan Division Retrofitting wroks for Providing Functional Household Tap Connection (FHTC) within the command area of of Srirampur Piped Water Supply Scheme, Purbasthali-I, Purba Bardhaman , SM/08103 Retrofitting Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of Srirampur Piped Water Supply Scheme at Srirampur (Srirampur & Srirampur East Para Habitation) Village (Mouza), Purbasthali-I Block under Burdwan Division, PHE Dte. Assistant Engineer ORD/000091/2021-2022 3654/BWD 14/07/2021 60 ASHOK KUMAR GHOSH 102.42 84.00 82.02 1
828 PURBA BARDHAMAN Burdwan Division Retrofitting wroks for Providing Functional Household Tap Connection (FHTC) within the command area of of Srirampur Piped Water Supply Scheme, Purbasthali-I, Purba Bardhaman , SM/08103 Retrofitting Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of Srirampur Piped Water Supply Scheme at Srirampur Northpara, Srirampur Southpara & Srirampur Westpara within Srirampur (P) Village (Mouza), Purbasthali-I Block under Burdwan Division, PHE Dte. Assistant Engineer ORD/000283/2021-2022 7002/BWD 16/12/2021 60 HAMID SK 71.23 70.84 99.45 1
829 PURBA BARDHAMAN Burdwan Division Retrofitting wroks for Providing Functional Household Tap Connection (FHTC) within the command area of of Srirampur Piped Water Supply Scheme, Purbasthali-I, Purba Bardhaman , SM/08103 Retrofitting Sinking of 250 X 150mm dia Tube Well 150 mtr. Depth by D.R. Rig method using UPVC pipe (CM) and UPVC Deep Well Screen (RMS) for 1ST TW Site of SRIRAMPUR & its adjoining mouzas Piped Water Supply Scheme, Block ? Purbasthali ? I, Dist - Purba Bardhaman under Burdwan Division, PHE Dte. Assistant Engineer ORD/000548/2022-2023 5127/BWD 21/11/2022 30 M/S SYCHROTECH INDUSTRY 8.73 0.00 0 0
830 PURBA BARDHAMAN Burdwan Division Retrofitting wroks for Providing Functional Household Tap Connection (FHTC) within the command area of of Srirampur Piped Water Supply Scheme, Purbasthali-I, Purba Bardhaman , SM/08103 Retrofitting Bypass arrangement of rising main and providing Functional house hold tap connections at Srirampur GP within Purbasthali-I Block under SRIRAMPUR PWSS under Burdwan Division, PHE Dte. Assistant Engineer ORD/000715/2022-2023 889/BWD 01/03/2023 30 JAMALUDDIN SK 13.01 12.88 99 0
831 PURBA BARDHAMAN Burdwan Division Retrofitting wroks for Providing Functional Household Tap Connection (FHTC) within the command area of of Srirampur Piped Water Supply Scheme, Purbasthali-I, Purba Bardhaman , SM/08103 Retrofitting Work order for " Providing Functional house hold tap connections for Sajal Gram Village within Purbasthali-I Block under Kalna Sub-Division under Burdwan Division, PHE Dte. (Nadanghat & others scheme) Sl No-7" Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000690/2022-2023 103/KSD 08/02/2023 30 MOMINUL ISLAM MONDAL 0.88 0.00 0 0
832 PURBA BARDHAMAN Burdwan Division Retrofitting wroks for Providing Functional Household Tap Connection (FHTC) within the command area of of Srirampur Piped Water Supply Scheme, Purbasthali-I, Purba Bardhaman , SM/08103 Retrofitting Laying of additional UPVC pipeline for interconnection with main line to branch line of SRIRAMPUR Water Supply Scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000710/2023-2024 4522/BWD 12/10/2023 30 JAMALUDDIN SK 6.16 2.89 46.92 100
833 PURBA BARDHAMAN Burdwan Division Retrofitting wroks for Providing Functional Household Tap Connection (FHTC) within the command area of of Srirampur Piped Water Supply Scheme, Purbasthali-I, Purba Bardhaman , SM/08103 Retrofitting NAME OF THE WORK -RESTORATION WORK OF BIDYANAGAR TO VIA DAMODAR PARA TO BOGPUR ROAD,PACKAGE NO-WB-22-27,BLOCK-PURBASTHALI-1,GP-SRIRAMPUR & JAHANNAGAR. BILL/00739/2024-2025 893/JJM 25/09/2024 EXECUTIVE ENGINEER (WBSRDA) PURBA BARDHAMAN DIVISION 5.21 0.00 0 null
834 PURBA BARDHAMAN Burdwan Division Retrofitting wroks for Providing Functional Household Tap Connection (FHTC) within the command area of of Srirampur Piped Water Supply Scheme, Purbasthali-I, Purba Bardhaman , SM/08103 Retrofitting Different types of works involve in connection with Augmentation of SRIRAMPUR (Zone I & II) (SM/08103), MANGANPUR (SM/13327), KAMALPUR (SM/13453) Piped Water Supply Scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000190/2024-2025 2429/BWD 27/06/2024 480 S.P. CONSTRUCTION 500.89 60.54 12.09 2
835 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) under the command area of Mahindar Piped Water Supply Scheme , SM/07550 Retrofitting Material Requisition To Resource Division RTOR000055/2022-2023 5523/BWD 23/12/2022 Resource Division 0.62 0.00 0 0
836 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) under the command area of Mahindar Piped Water Supply Scheme , SM/07550 Retrofitting Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of Mahindar Piped Water Supply Scheme at Mahindar Village (2 Nos habitations), Faimpur Village, Shitalpur Village, Sahapur Village (2 Nos. habitations & Parbatpur Village (2 Nos. habitations), Jamalpur Block under Burdwan Division, PHE Dte. [Agreement No. 684/BWD OF 2020-2021.] AE(HQs) ORD/000301/2020-2021 1456/BWD 18/02/2021 60 S.S. CONSTRUCTION 73.07 24.31 33.27 1
837 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) under the command area of Mahindar Piped Water Supply Scheme , SM/07550 Retrofitting Continuation work order for Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Madhabpur village and Madhabpur habitation of MADHABPUR Piped Water Supply Scheme within Burdwan Sub-Divn. under Burdwan Division, PHE. Dte. [Phase - I] [GROUP : ¿7C¿] AE(HQs),Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000846/2020-2021 7050/BWD 22/12/2020 30 KAJAL MUKHERJEE 4.86 0.00 0 1
838 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) under the command area of Mahindar Piped Water Supply Scheme , SM/07550 Retrofitting Laying of uPVC pipe for providing FHTC at Faimpur, Parbatpur, Sahapur, Silatpur and Mahindar Village within Mahindar Piped Water Supply Scheme, Jamalpur Block under Burdwan Division P.H.E Dte._Gr. F AE(HQs) ORD/000631/2021-2022 128/AE/HQ 04/03/2022 15 M/S S. CHOUDHURY 4.82 4.81 99.79 1
839 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) under the command area of Mahindar Piped Water Supply Scheme , SM/07550 Retrofitting Providing Functional Household Tap Connection (FHTC) at Sahapur and Faimpur village within the command area of MAHINDAR Piped Water Supply Scheme at Jamalpur Block under Burdwan Division, PHE Dte. [Group : D] AE(HQs) ORD/000048/2022-2023 202/AE/HQ 06/04/2022 30 DEBJYOTI GOSWAMI 4.84 4.81 99.38 1
840 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) under the command area of Mahindar Piped Water Supply Scheme , SM/07550 Retrofitting Laying of rising main for interconnection of Pump House No 1 & 2 and distribution main alongwith bypass arrangement for Over Head Reservoir for Mahindar Piped water supply scheme within Jamalpur Block under Burdwan Division, PHE Dte. [Gr.-D] AE(HQs) ORD/000957/2020-2021 1229/AE/HQ 10/02/2021 30 APORUPA CONSTRUCTION 4.97 0.00 0 1
841 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) under the command area of Mahindar Piped Water Supply Scheme , SM/07550 Retrofitting Providing Functional Household Tap Connection (FHTC) at Parbatpur village within the command area of MAHINDAR Piped Water Supply Scheme at Jamalpur Block under Burdwan Division, PHE Dte. [Group : A] AE(HQs) ORD/000040/2022-2023 227/AE/HQ 19/04/2022 30 M/S S. CHOUDHURY 4.78 4.78 100 1
842 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) under the command area of Mahindar Piped Water Supply Scheme , SM/07550 Retrofitting Providing Functional Household Tap Connection (FHTC) at Mahindar village within the command area of MAHINDAR Piped Water Supply Scheme at Jamalpur Block under Burdwan Division, PHE Dte. [Group : E] AE(HQs) ORD/000049/2022-2023 203/AE/HQ 06/04/2022 30 M/S ASHA CONSTRUCTION 4.85 4.84 99.79 1
843 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) under the command area of Mahindar Piped Water Supply Scheme , SM/07550 Retrofitting Repairing of concrete road damaged due to laying of pipeline within command area of MAHINDER PWSS under Burdwan Division PHE Dte. AE(HQs) J.E. 2 BURDWAN ORD/000560/2023-2024 760/AE/HQ 23/08/2023 30 GHOSH CONSTRUCTION 2.68 2.12 79.1 100
844 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) under the command area of Mahindar Piped Water Supply Scheme , SM/07550 Retrofitting Construction of approach road to get to the Head works site of MAHINDAR Piped Water Supply Scheme, Jamalpur Block under Burdwan Division P.H.E Dte._2ND CALL [Group : G] AE(HQs) ORD/000051/2022-2023 205/AE/HQ 06/04/2022 30 APORUPA CONSTRUCTION 4.84 0.00 0 100
845 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) under the command area of Panuhat Piped Water Supply Scheme , SM/07552 Retrofitting Extension of pipe line for FHTC work from the existing Distribution System within scheme jurisdiction at Panuhat village under Panuhat PWSS under Katwa Sub-Division under Burdwan Division PHE Dte. [Phase-2] (Sl No-2) Assistant Engineer ORD/000299/2021-2022 729/KTS 16/11/2021 7 HAMID SK 1.93 1.93 100 1
846 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) under the command area of Panuhat Piped Water Supply Scheme , SM/07552 Retrofitting Extension of pipe line for FHTC work from the existing Distribution System within scheme jurisdiction at Panuhat village under Panuhat PWSS under Katwa Sub-Division under Burdwan Division PHE Dte. [Phase-1] (Sl No-1) Assistant Engineer ORD/000298/2021-2022 728/KTS 16/11/2021 7 HAMID SK 1.96 1.96 100 1
847 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) under the command area of Panuhat Piped Water Supply Scheme , SM/07552 Retrofitting Supplying, laying and commissioning of Rising main at pump no. - 1 of Panuhat Piped Water Supply Scheme under Katwa Sub-Division under Burdwan Division, PHE Dte. [Sl No-06] Assistant Engineer ORD/000159/2022-2023 443/KTS 27/06/2022 30 HAMID SK 2.27 2.27 100 1
848 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) under the command area of Panuhat Piped Water Supply Scheme , SM/07552 Retrofitting Hire & fuel charges of vehicle (Car No.-WB-04G-6018) for the office of the Assistant Engineer, Katwa Sub-Division, PHE Dte. for the month of November & December'22. BILL/00467/2022-2023 1048/JJM 07/02/2023 M/S MUNMUN DEY 0.59 0.00 0 0
849 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) under the command area of Panuhat Piped Water Supply Scheme , SM/07552 Retrofitting Hire & fuel charges of vehicle (Car No.-WB-04G-6018) for the office of the Assistant Engineer, Katwa Sub-Division, PHE Dte. for the month of January'23. BILL/00468/2022-2023 1118/JJM 27/02/2023 M/S MUNMUN DEY 0.26 0.00 0 0
850 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) under the command area of Panuhat Piped Water Supply Scheme , SM/07552 Retrofitting Sinking of 300 X 200mm dia Tube Well 200 mtr. Depth by D.R. Rig method using UPVC pipe (CM) and UPVC Medium Well Screen (RMS) for Augmentation of PANUHAT and its adjoining mouzas Piped Water Supply Scheme, Block Katwa I, Dist - Purba Bardhaman under Burdwan Division, PHE Dte. Assistant Engineer JUNIOR ENGINEER KATWA SUB-DIVISION PHE DTE ORD/000668/2022-2023 387/BWD 31/01/2023 30 SUBODH KUMAR MONDAL 11.70 4.17 35.64 100
851 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) under the command area of Panuhat Piped Water Supply Scheme , SM/07552 Retrofitting Detail route survey, design of distribution network and preparation of estimate, drawing & DPR for providing FHTC in the scheme EKAIHAT, PANUHAT PWSS (Sl No-2) Assistant Engineer JUNIOR ENGINEER KATWA SUB-DIVISION PHE DTE ORD/000070/2023-2024 394/KTS 13/04/2023 30 SIRCON ENGINEERING SERVICES 2.48 0.00 0 100
852 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) under the command area of Panuhat Piped Water Supply Scheme , SM/07552 Retrofitting Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of PANUHAT Piped Water Supply Scheme at different villages, Katwa-I Block under Burdwan Division, PHE Dte. (Part-B).[Agreement No. 728/BWD OF 2020-2021.] AE(HQs) J.E. 2 BURDWAN ORD/000325/2020-2021 1689/BWD 24/02/2021 45 HAMID SK 35.28 35.04 99.32 0
853 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) under the command area of Panuhat Piped Water Supply Scheme , SM/07552 Retrofitting Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of PANUHAT Piped Water Supply Scheme at different villages, Katwa-I Block under Burdwan Division, PHE Dte. (Part-A).[Agreement No. 727/BWD OF 2020-2021.] Assistant Engineer JUNIOR ENGINEER KATWA SUB-DIVISION PHE DTE ORD/000326/2020-2021 1688/BWD 24/02/2021 45 HAMID SK 35.66 19.00 53.28 0
854 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) under the command area of Panuhat Piped Water Supply Scheme , SM/07552 Retrofitting Balance work of OHR at Head Work site, construction of HUME Pipe culvert , Road restoration work and boundary wall at 2nd TW site with Gate, land development at Head work site and 2nd TW site under KAITHAN, SUDPUR & PANUHAT Piped Water Supply Scheme under KATWA -I Block, under Katwa Sub-Division within Burdwan Division, PHE Dte. Assistant Engineer JUNIOR ENGINEER KATWA SUB-DIVISION PHE DTE ORD/000486/2024-2025 3141/BWD 20/08/2024 120 VISHAL CONSTRUCTION CO. 126.29 0.00 0 50
855 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) under the command area of Taraposh Piped Water Supply Scheme , SM/07553 Retrofitting Hire & fuel charges of vehicle (Car No.-WB-41H-9788) for the office of the Assistant Head Quarters, Burdwan Division, PHE Dte. for the month of June & July'22. VCH/000493/2022-2023 460/VEH/22-23 29/08/2022 SK. ASRAFUDDIN 0.76 0.00 0 0
856 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) under the command area of Taraposh Piped Water Supply Scheme , SM/07553 Retrofitting Hire & fuel charges of vehicle (Car No.-WB-41H-9788) for the office of the Assistant Engineer, Headquarters, Burdwan Division, PHE Dte. for the month of September & October'2022. VCH/000839/2022-2023 766/VEH/22-23 22/11/2022 SK. ASRAFUDDIN 0.70 0.00 0 0
857 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) under the command area of Taraposh Piped Water Supply Scheme , SM/07553 Retrofitting Providing functional household tap connection (FHTC) from existing distribution system within the command area of Taraposh piped water supply scheme at Alladipur, Chintamonipur, Jarul, Kamdebpur, Punia, Sunia & Taraposh, Khandaghosh Block under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000584/2020-2021 4766/BWD 01/12/2020 90 SINGHA ROY AND CO. 70.55 27.59 39.11 1
858 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) under the command area of Taraposh Piped Water Supply Scheme , SM/07553 Retrofitting Repairing of Pipeline of DVC 11 No. Canal towards Amila Bazar and DVC 11B No. Conal Towards Sehara Bazar at TARAPOSH Pipes Water Supply Scheme at Khandaghosh Block under Burdwan Division,PHE Dte. Group : F Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000093/2022-2023 833/BSD 23/05/2022 30 HAFIJUR RAHAMAN MIDYA 1.56 1.57 100.64 1
859 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) under the command area of Taraposh Piped Water Supply Scheme , SM/07553 Retrofitting Providing leftout water tap connection in different villages for 100% coverage to make it Sajal Gram from existing distribution system within scheme jurisdiction of different Piped Water Supply Schemes within Khandaghosh Block under Burdwan Division, PHE. Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000405/2021-2022 283/BWD 17/01/2022 30 J. K. CORPORATION 11.88 11.87 99.92 1
860 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) under the command area of Taraposh Piped Water Supply Scheme , SM/07553 Retrofitting Construction of 250 cum capacity 20 Mtr staging height RCC Over Head Reservoir including pipe connection and cost of pipes specials including soil investigation for TARAPOSH & its adjoining mouzas water supply scheme under Burdwan Sub-Division, under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000973/2020-2021 4594/BWD 24/11/2020 180 MITRA CONSTRUCTION 57.00 56.00 98.25 100
861 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) under the command area of Taraposh Piped Water Supply Scheme , SM/07553 Retrofitting Extension Pipeline with Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of TARAPOSE Piped Water Supply Scheme within KHANDAGHOSH Block of Burdwan Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000759/2022-2023 1289/BWD 20/03/2023 30 GENUINE ENGINEERING CO-OP. SOCIETY LTD. 21.86 0.00 0 100
862 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) under the command area of Shushuni Piped Water Supply Scheme , SM/07557 Retrofitting Continuation work order for water tap connection in each household from existing distribution system within scheme jurisdiction in Kuli habitation of Shushunia piped water supply scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. [Gr.-H] Assistant Engineer ORD/000910/2020-2021 4787./BWD 02/12/2020 30 SUSUNIA GP CO. OPERATIVE LABOUR CONTRACT AND CONSTRUCTION SOCIETY LTD. 2.92 1.91 65.41 1
863 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) under the command area of Shushuni Piped Water Supply Scheme , SM/07557 Retrofitting Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of Shushuni Piped Water Supply Scheme at Shushuni (Part) (Ghoshpara & Sethpur habitation) Village (Mouza), Monteswar Block under Burdwan Division, PHE Dte. [Agreement No.661/BWD OF 2020-2021] AE(HQs) J.E. 2 BURDWAN ORD/000300/2020-2021 1152/BWD 09/02/2021 30 SUSUNIA GP CO. OPERATIVE LABOUR CONTRACT AND CONSTRUCTION SOCIETY LTD. 19.79 5.40 27.29 1
864 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) under the command area of Shushuni Piped Water Supply Scheme , SM/07557 Retrofitting Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of Shushuni Piped Water Supply Scheme at Shushuni (Part) (Tentulia Bogpara habitation), Budhpur & Kalswar Village (Mouza), Monteswar Block under Burdwan Division, PHE Dte.[Agreement No. 660/BWD OF 2020-2021] Assistant Engineer ORD/000333/2020-2021 1151/BWD 09/02/2021 30 SUSUNIA GP CO. OPERATIVE LABOUR CONTRACT AND CONSTRUCTION SOCIETY LTD. 22.80 9.63 42.24 1
865 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) under the command area of Shushuni Piped Water Supply Scheme , SM/07557 Retrofitting Laying of UPVC pipeline for smooth running of FHTC work of SHUSHUNIA Water Supply Scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer ORD/000115/2023-2024 2342/BWD 22/05/2023 30 SUSUNIA GP CO. OPERATIVE LABOUR CONTRACT AND CONSTRUCTION SOCIETY LTD. 22.26 21.07 94.65 100
866 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) under the command area of Shushuni Piped Water Supply Scheme , SM/07557 Retrofitting Work order for Restoration of road and base concreting in FHTC for retrofitting of Shushunia water supply scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer ORD/000131/2023-2024 427/KSD 11/05/2023 30 SUSUNIA GP CO. OPERATIVE LABOUR CONTRACT AND CONSTRUCTION SOCIETY LTD. 0.60 0.57 95 100
867 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) under the command area of Shushuni Piped Water Supply Scheme , SM/07557 Retrofitting Designing, Making and Erection of Sign Board for SAJAL GRAM in Budhpur Village, Monteswar Block within Susunia PWSS under Burdwan Division, PHE Dte. (5 Nos Board) AE(HQs) J.E. 1 BURDWAN ORD/000735/2023-2024 828/AE/HQ 30/10/2023 30 ISHAN CONSTRUCTION 0.76 0.00 0 100
868 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) under the command area of Shushuni Piped Water Supply Scheme , SM/07557 Retrofitting Designing, Making and Erection of Sign Board for SAJAL GRAM in Kuli Village, Monteswar Block within Susunia PWSS under Burdwan Division, PHE Dte. (5 Nos Board) AE(HQs) J.E. 1 BURDWAN ORD/000734/2023-2024 827/AE/HQ 30/10/2023 30 ISHAN CONSTRUCTION 0.76 0.36 47.37 100
869 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) under the command area of Shushuni Piped Water Supply Scheme , SM/07557 Retrofitting Conducting physical Household Survey at the IMIS reported village for HGJ certification and providing balance FHTC for Har Ghar Jal certification including conducting Gram Sabhas for different IMIS reported villages across the district under Burdwan Division, PHE Dte. AE(HQs),Assistant Engineer ,Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE.,Assistant Engineer, Durgapur Sub Division, P.H.E. Dte JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000428/2024-2025 3107/BWD 12/08/2024 90 TUBGRAM GRAMMYAK UNNAYAN SAMITY 309.60 0.00 0 50
870 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of SHURA Piped Water Supply Scheme at Jamalpur Block , SM/07858 Retrofitting Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of Shura (Zone-I) Piped Water Supply Scheme at Shura Village (3 Nos. habitations), Chakdihi Village & Shukpur Village, Jamalpur Block under Burdwan Division, PHE Dte. AE(HQs) ORD/000675/2020-2021 1763/BWD 26/02/2021 60 SUKALPA NIRMAN 83.40 82.16 98.51 1
871 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of SHURA Piped Water Supply Scheme at Jamalpur Block , SM/07858 Retrofitting Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of Shura (Zone-II) Piped Water Supply Scheme at Haragobindapur Village, Kubajpur Village, Dhapdhara Village, Sonargoria Village, Sahahosenpur Village & Paikpara Village Jamalpur Block under Burdwan Division, PHE Dte. (Agreement No. 687/BWD of 2020-2021) AE(HQs) ORD/000338/2020-2021 1324/BWD 12/02/2021 60 M/S PIONEER CONSTRUCTION 73.63 64.51 87.61 1
872 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of SHURA Piped Water Supply Scheme at Jamalpur Block , SM/07858 Retrofitting Hire & fuel charges of vehicle (Car No.-WB-41H-9788) for the office of the Assistant Engineer, Headquarters, Burdwan Division, PHE Dte. for the month of September & October'2022. VCH/000839/2022-2023 766/VEH/22-23 22/11/2022 SK. ASRAFUDDIN 0.70 0.00 0 0
873 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of SHURA Piped Water Supply Scheme at Jamalpur Block , SM/07858 Retrofitting Laying of HDPE pipe for providing FHTC in different habitation of Shura Mouza within Shura Piped Water Supply Scheme (Zone-I), Jamalpur Block under Burdwan Division, P.H.E DTE. [Group: ¿A¿] AE(HQs) ORD/000225/2021-2022 1815/AE/HQ 21/09/2021 30 SUKALPA NIRMAN 4.79 4.22 88.1 1
874 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of SHURA Piped Water Supply Scheme at Jamalpur Block , SM/07858 Retrofitting Laying of HDPE pipe for underground crossing of river embankment at different section of Shura piped water supply scheme (Zone-II) under Burdwan Division, PHE Dte. [Gr.-A] AE(HQs) ORD/000414/2021-2022 1855/AE/HQ 05/10/2021 30 M/S PIONEER CONSTRUCTION 4.67 0.00 0 1
875 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of SHURA Piped Water Supply Scheme at Jamalpur Block , SM/07858 Retrofitting Laying of rising main for interconnection of Pump House 1 & 2 and distribution main along with bye pass arrangement for Over Head Reservoir for Shura piped water supply scheme (Zone-II) within Jamalpur Block under Burdwan Division, PHE Dte.[Gr.-B] AE(HQs) ORD/000924/2020-2021 1226/AE/HQ 10/02/2021 30 M/S UNIT CONSTRUCTION 4.29 0.00 0 1
876 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of SHURA Piped Water Supply Scheme at Jamalpur Block , SM/07858 Retrofitting Laying of HDPE pipeline at Shura, Chakdighi and Shukpur village for providing FHTC within Shura PWSS (Zone-I), Block-Jamalpur under Burdwan Division, PHE Dte._Gr-A AE(HQs) ORD/000626/2021-2022 124/AE/HQ 04/03/2022 15 BANGA NIRMAN 4.71 4.56 96.82 1
877 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of SHURA Piped Water Supply Scheme at Jamalpur Block , SM/07858 Retrofitting Laying of HDPE pipeline at Dhapdhara village for providing FHTC within SHURA PWSS (Zone-II), Block-Jamalpur under Burdwan Division, PHE Dte._Gr-A AE(HQs) ORD/000665/2021-2022 133/AE/HQ 11/03/2022 20 M/S UNIT CONSTRUCTION 2.79 2.79 100 1
878 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of SHURA Piped Water Supply Scheme at Jamalpur Block , SM/07858 Retrofitting Supply & delivery of different dia. CIDF Pipes, Sluice valve & fittings for construction of RCC OHR (350 cum capacity) for SHURA (ZONE-I) W/S. Scheme under Burdwan Division, P.H.E. Dte. [Group: B] AE(HQs) ORD/000742/2021-2022 165/AE/HQ 24/03/2022 10 BENGAL BUILDERS 3.08 0.00 0 1
879 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of SHURA Piped Water Supply Scheme at Jamalpur Block , SM/07858 Retrofitting Laying of rising main for interconnection of Pump House -1 &2 and distribution main alongwith bye-pass arrangement for Over Head Reservoir for Shura piped water supply scheme (Zone-I) within Jamalpur Block under Burdwan Division, PHE Dte.[Gr.-A] AE(HQs) ORD/000929/2020-2021 1228/AE/HQ 10/02/2021 30 BENGAL BUILDERS 4.71 0.00 0 1
880 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of SHURA Piped Water Supply Scheme at Jamalpur Block , SM/07858 Retrofitting Laying of HDPE pipeline at Sonargoria and Kubajur village for providing FHTC within Shura PWSS (Zone-II), Block-Jamalpur under Burdwan Division, PHE Dte._2ND CALL [Group : F] AE(HQs) ORD/000050/2022-2023 204/AE/HQ 06/04/2022 30 M/S UNIT CONSTRUCTION 4.81 4.71 97.92 1
881 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of SHURA Piped Water Supply Scheme at Jamalpur Block , SM/07858 Retrofitting Providing Functional Household Tap Connection (FHTC) from existing distribution system at leftout area of Chakdighi Gram Panchayat within the command area of SHURA ZONE-I Piped Water Supply Scheme at Jamalpur Block under Burdwan Division, PHE Dte. GROUP : C AE(HQs) ORD/000229/2022-2023 426/AE/HQ 03/08/2022 30 D.M. ENTERPRISE 3.25 3.24 99.69 1
882 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of SHURA Piped Water Supply Scheme at Jamalpur Block , SM/07858 Retrofitting Extension of pipeline for SHURA (Zone-II) Piped W/S. Scheme Total 129 Nos. FHTC work for Sajal Gram (As per Field Verification Report for Har Ghar Jal Certification within Jamalpur Block including leftout household water tap connection (FHTC) under Burdwan Division, PHE Dte. AE(HQs) ORD/000723/2022-2023 970/BWD 03/03/2023 30 SANDIPAN SENGUPTA 4.08 4.08 100 1
883 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of SHURA Piped Water Supply Scheme at Jamalpur Block , SM/07858 Retrofitting Relaying of UPVC pipe damaged due to construction of guard wall to maintain water supply at different location within command area of SURAH ZONE II PWSS Block Jamalpur under Burdwan Division P.H.E Dte. AE(HQs) J.E. 2 BURDWAN ORD/000625/2022-2023 523/AE/HQ 29/09/2022 30 J. K. CORPORATION 0.41 0.00 0 0
884 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of SHURA Piped Water Supply Scheme at Jamalpur Block , SM/07858 Retrofitting Supplying, laying, fitting, fixing of Sluice valve including construction of valve chamber within command area of SURAH ZONE I PWSS Block Jamalpur under Burdwan Division P.H.E Dte. AE(HQs) J.E. 2 BURDWAN ORD/000626/2022-2023 524/AE/HQ 29/09/2022 30 D.M. ENTERPRISE 0.41 0.37 90.24 100
885 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of SHURA Piped Water Supply Scheme at Jamalpur Block , SM/07858 Retrofitting Extension of pipeline for SHURA (Zone-I) Piped W/S. Scheme Total 115 Nos. FHTC work for Sajal Gram (As per Field Verification Report for Har Ghar Jal Certification within Jamalpur Block including leftout household water tap connection (FHTC) under Burdwan Division, PHE Dte. AE(HQs) J.E. 3 BURDWAN ORD/000751/2022-2023 1185/BWD 15/03/2023 30 SK NUR ALAM 3.52 3.30 93.75 100
886 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of SHURA Piped Water Supply Scheme at Jamalpur Block , SM/07858 Retrofitting Laying of different dia UPVC pipeline for providing FHTC work at various places under SHURA ZONE- I PWSS, Jamalpur Dev. Block under Burdwan Division, PHE Dte. AE(HQs) Junior Engineer, Burdwan Division ORD/001028/2023-2024 97/AE/HQ 15/02/2024 30 D.M. ENTERPRISE 0.93 0.00 0 100
887 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of SHURA Piped Water Supply Scheme at Jamalpur Block , SM/07858 Retrofitting Construction & Installation of Sluice valve & valve Chamber to control the flow of water under SHURA ZONE-I PWSS, Jamalpur Dev. Block under Burdwan Division, PHE Dte. AE(HQs) Junior Engineer, Burdwan Division ORD/001029/2023-2024 98/AE/HQ 15/02/2024 30 D.M. ENTERPRISE 0.76 0.00 0 100
888 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of SHURA Piped Water Supply Scheme at Jamalpur Block , SM/07858 Retrofitting Beautification work at Head work, 2nd Pump house site of Surah Zone-I PWSS with Arboriculture, Recharge Pit including shaft and anciliary works at (Jamalpur Block) P.W.S.S under Burdwan Division, PHE Dte. Junior Engineer, R.W.S. Burdwan Sub Division, P.H.E. Dt ORD/000549/2024-2025 280/RWS 03/09/2024 10 D.M. ENTERPRISE 0.97 0.00 0 0
889 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of SHURA Piped Water Supply Scheme at Jamalpur Block , SM/07858 Retrofitting Beautification work at Head work, 2nd Pump house site of Surah Zone-II PWSS with Arboriculture, Recharge Pit including shaft and anciliary works at (Jamalpur Block) P.W.S.S under Burdwan Division, PHE Dte. Junior Engineer, R.W.S. Burdwan Sub Division, P.H.E. Dt ORD/000550/2024-2025 281/RWS 27/08/2024 10 J.K. CORPORATION 0.97 0.00 0 0
890 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of SHURA Piped Water Supply Scheme at Jamalpur Block , SM/07858 Retrofitting Shifting & Relaying of Damaged UPVC Pipeline at Chakdighi for Construction of Road under "PATHASHREE", SHURA ZONE-I PWSS, Jamalpur Dev. Block under Burdwan Division, PHE Dte. AE(HQs) Junior Engineer, Burdwan Division ORD/000627/2024-2025 745/AE/HQ 13/09/2024 30 D.M. ENTERPRISE 0.95 0.00 0 100
891 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of SHURA Piped Water Supply Scheme at Jamalpur Block , SM/07858 Retrofitting Shifting & Relaying of Damaged UPVC Pipeline at Chakdighi Baganbari for Construction of Road under "PATHASHREE", SHURA ZONE-I PWSS, Jamalpur Dev. Block under Burdwan Division, PHE Dte. AE(HQs) Junior Engineer, Burdwan Division ORD/000628/2024-2025 746/AE/HQ 13/09/2024 30 D.M. ENTERPRISE 0.72 0.00 0 100
892 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of SHURA Piped Water Supply Scheme at Jamalpur Block , SM/07858 Retrofitting Re-laying of UPVC (Damaged By WBSRDA Department) pipeline near Dhapdhara Uttor Pal Para under SHURA Z-II PWSS, Jamalpur Dev. Block under Burdwan Division, PHE Dte. AE(HQs) Junior Engineer, Burdwan Division ORD/000590/2024-2025 742/AE/HQ 13/09/2024 30 J.K. CORPORATION 0.96 0.96 100 100
893 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of SHURA Piped Water Supply Scheme at Jamalpur Block , SM/07858 Retrofitting Re-laying of UPVC (Damaged By WBSRDA Department) pipeline near Dhapdhara Bostom Para under SHURA Z-II PWSS, Jamalpur Dev. Block under Burdwan Division, PHE Dte. AE(HQs) Junior Engineer, Burdwan Division ORD/000591/2024-2025 743/AE/HQ 13/09/2024 30 J.K. CORPORATION 0.94 0.94 100 100
894 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of SHURA Piped Water Supply Scheme at Jamalpur Block , SM/07858 Retrofitting Re-laying of UPVC (Damaged By WBSRDA Department) pipeline near Dhapdhara Purba Pal Para under SHURA Z-II PWSS, Jamalpur Dev. Block under Burdwan Division, PHE Dte. AE(HQs) Junior Engineer, Burdwan Division ORD/000592/2024-2025 744/AE/HQ 13/09/2024 30 J.K. CORPORATION 0.96 0.96 100 100
895 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of SHURA Piped Water Supply Scheme at Jamalpur Block , SM/07858 Retrofitting Extension of pipeline & providing Functional House Tap Connection at leftout portion of SHURA Zone-II W/S Scheme within Jamalpur Block under Burdwan Division, P.H.E Dte. AE(HQs) J.E. 2 BURDWAN,Junior Engineer, Burdwan Division ORD/000571/2023-2024 764/AE/HQ 25/08/2023 30 SANDIPAN SENGUPTA 3.93 2.64 67.18 100
896 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of ABUJHATI Piped Water Supply Scheme at Jamalpur Block , SM/07861 Retrofitting Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Abujhati village of Abujhati piped water supply scheme within Burdwan Sub-Division under Burdwan Division, PHE Dte. [Phase-I](Tr No.-312/BWD/2020-21) Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000167/2020-2021 2739/BWD 10/08/2020 30 INDRAJIT MONDAL 4.92 4.92 100 1
897 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of ABUJHATI Piped Water Supply Scheme at Jamalpur Block , SM/07861 Retrofitting Continuation work order for Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Abujhati village of Abujhati piped water supply scheme within Burdwan Sub-Division under Burdwan Division, PHE Dte. [Phase-I](Tr No.-456/BWD/2020-21) Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000171/2020-2021 3740/BWD 07/10/2020 30 INDRAJIT MONDAL 4.92 4.92 100 1
898 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of ABUJHATI Piped Water Supply Scheme at Jamalpur Block , SM/07861 Retrofitting Providing functional household tap connection from existing distribution system within the command area of Abujhati piped water supply scheme at Napara, Panchshimul & Siromani village Jamalpur Block under Burdwan Division, PHE Dte. (Tr No.-627/BWD/2020-21) Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000371/2020-2021 954/BWD 03/02/2021 45 KOUSIK MALLICK 38.90 38.58 99.18 1
899 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of ABUJHATI Piped Water Supply Scheme at Jamalpur Block , SM/07861 Retrofitting Providing Functional Household tap connection (FHTC) from existing distribution system within the command area of Abujhati piped water supply scheme at Astai, Dastanpur & Keotara village (Mouza), Jamalpur Block under Burdwan Division, PHE Dte. [Tr No.-624/BWD/20-21] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000404/2020-2021 955/BWD 03/02/2021 45 BHARAT CONSTRUCTION 41.04 39.68 96.69 1
900 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of ABUJHATI Piped Water Supply Scheme at Jamalpur Block , SM/07861 Retrofitting Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Ajhapur village of Abujhati piped water supply scheme within Burdwan Sub-Division under Burdwan Division, PHE Dte. [Phase-I](Tr No.-331/BWD/2020-21) Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000168/2020-2021 2748/BWD 10/08/2020 30 E-WORLD 4.92 4.92 100 1
901 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of ABUJHATI Piped Water Supply Scheme at Jamalpur Block , SM/07861 Retrofitting Continuation work order for Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Ajhapur village of Abujhati piped water supply scheme within Burdwan Sub-Division under Burdwan Division, PHE Dte. [Phase-I](Tr No.-429/BWD/2020-21) Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000172/2020-2021 3803/BWD 08/10/2020 30 E-WORLD 4.92 4.92 100 1
902 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of ABUJHATI Piped Water Supply Scheme at Jamalpur Block , SM/07861 Retrofitting Providing leftout water tap connection in different villages for 100% coverage to make it Sajal Gram from existing distribution system within scheme jurisdiction of different Piped Water Supply Schemes within Jamalpur Block (Paratal-II, Berugram, Abujhati & Chakdighi G.P.) under Burdwan Division, PHE. Dte. (Part-B). AE(HQs),Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JE/RWS/JAMALPUR ORD/000345/2021-2022 40/BWD 05/01/2022 30 PREMANANDA ROY BISWAS 22.68 0.00 0 1
903 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of ABUJHATI Piped Water Supply Scheme at Jamalpur Block , SM/07861 Retrofitting Providing leftout water tap connection in different villages for 100% coverage to make it Sajal Gram from existing distribution system within scheme jurisdiction of different Piped Water Supply Schemes within Jamalpur Block (Jarogram, Ajhapur, Panchra & Jougram G.P.) under Burdwan Division, PHE. Dte. (Part-A)_2ND CALL. AE(HQs),Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JE/RWS/JAMALPUR ORD/000592/2021-2022 1454/BWD 11/03/2022 30 PREMANANDA ROY BISWAS 18.83 6.00 31.86 1
904 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of ABUJHATI Piped Water Supply Scheme at Jamalpur Block , SM/07861 Retrofitting Sinking of 300 X 200mm dia Tube Well 150 mtr. Depth by D.R. Rig method using UPVC pipe (CM) and UPVC Medium Well Screen (RMS) of ABUJHATI & its adjoining mouzas Piped Water Supply Scheme, Block - Jamalpur, Dist - Purba Bardhaman under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000544/2022-2023 5125/BWD 21/11/2022 30 SUSUNIA GP CO. OPERATIVE LABOUR CONTRACT AND CONSTRUCTION SOCIETY LTD. 11.23 10.88 96.88 1
905 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of ABUJHATI Piped Water Supply Scheme at Jamalpur Block , SM/07861 Retrofitting Withdrawing and Relaying of Rising main line and Bullah pilling (60.0 mtr) at HD Works Site (near pond) due to Road widening from 4lane to 6 lane of NH2 at chanage 601+951 and 601+650 of ABUJHATI PWSS to in Jamalpur Block within Burdwan Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000760/2022-2023 1290/BWD 20/03/2023 30 SOUMYAVASH DAS 5.77 5.74 99.48 100
906 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of ABUJHATI Piped Water Supply Scheme at Jamalpur Block , SM/07861 Retrofitting Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of Abujhati Piped Water Supply Scheme at Abujhati (Part) (3 Nos Habitation Part) & Ajapur (Part) (Abujhati Part Habitation) Village (Mouza), Jamalpur Block under Burdwan Division, PHE Dte. _2ND CALL. [Agreement No. 754/BWD OF 2020-2021] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. Junior Engineer, R.W.S. Burdwan Sub Division, P.H.E. Dt ORD/000412/2020-2021 1740/BWD 25/02/2021 45 T.K. BANERJEE & CO. 34.87 35.11 100.69 0
907 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of ABUJHATI Piped Water Supply Scheme at Jamalpur Block , SM/07861 Retrofitting Extension of pipeline for providing functional household tap connection at Dastanpur & Keotara village (Mouza) of ABUJHATI piped water supply scheme within Burdwan Sub-Division under Burdwan Division, PHE Dte.(Gr.-D) Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. Junior Engineer, R.W.S. Burdwan Sub Division, P.H.E. Dt ORD/000154/2021-2022 1091/BSD 18/08/2021 45 BHARAT CONSTRUCTION 3.36 3.34 99.4 0
908 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of ABUJHATI Piped Water Supply Scheme at Jamalpur Block , SM/07861 Retrofitting Laying different dia UPVC Pipeline for inter connection of existing FHTC near Kayastyaparan of Abujhati Flyover i.c.w. Road widening from 4 lane to 6 lane of NH-2 at chane 601+9521+960 under ABUIHATI PWSS in jamalpur Block within Burdwan Sub Divn. under Burdwan Division, P.H.E. Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/001093/2023-2024 517/BSD 13/03/2024 30 SOUMYAVASH DAS 0.89 0.00 0 100
909 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of ABUJHATI Piped Water Supply Scheme at Jamalpur Block , SM/07861 Retrofitting Improvement of 300cum. OHR (Concreting,Plastering,Primer and Painting) for Abujhati PWSS under Jamalpur Block under Burdwan Division PHE Dte. RWS_JAMALPUR ORD/000134/2024-2025 1015/BSD 07/06/2024 45 DEBASHISH ENTERPRISE 2.01 0.00 0 0
910 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of ABUJHATI Piped Water Supply Scheme at Jamalpur Block , SM/07861 Retrofitting Conducting physical Household Survey at the IMIS reported village for HGJ certification and providing balance FHTC for Har Ghar Jal certification including conducting Gram Sabhas for different IMIS reported villages across the district under Burdwan Division, PHE Dte. AE(HQs),Assistant Engineer ,Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE.,Assistant Engineer, Durgapur Sub Division, P.H.E. Dte JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000428/2024-2025 3107/BWD 12/08/2024 90 TUBGRAM GRAMMYAK UNNAYAN SAMITY 309.60 0.00 0 50
911 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of ABUJHATI Piped Water Supply Scheme at Jamalpur Block , SM/07861 Retrofitting Construction of Boundary wall, Land Development for various PWSS, Block- Jamalpur, District:- Purba-Bardhaman within Burdwan Sub Division under Burdwan Division PHE Dte. AE(HQs) ORD/001100/2024-2025 433/BWD 20/01/2025 120 RABINDRA NATH GORANG 132.64 0.00 0 0
912 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Nadangahat Piped Water Supply Scheme , SM/07801 Retrofitting Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Dhamai village and Dhamai habitation of Nadanghat piped water supply scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. [Phase-I](Tr No.-558/BWD/2020-21) Assistant Engineer ORD/000255/2020-2021 4120/BWD 16/10/2020 30 NANDY UDYOG 4.85 4.85 100 1
913 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Nadangahat Piped Water Supply Scheme , SM/07801 Retrofitting Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Dhamai village and Nimar habitation of Nadanghat piped water supply scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. [Phase-I](Tr No.-389/BWD/2020-21) Assistant Engineer ORD/000258/2020-2021 4121/BWD 16/10/2020 30 RUPALI ENTERPRISE 4.86 4.86 100 1
914 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Nadangahat Piped Water Supply Scheme , SM/07801 Retrofitting Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of Nadanghat Piped Water Supply Scheme at Kundapara village & Nadanghat village, Purbasthali - I Block under Burdwan Division, PHE Dte. (Agreement No. 700/BWD of 2020-2021) Assistant Engineer ORD/000334/2020-2021 1543/BWD 22/02/2021 60 MAA LAXMI ENTERPRISE 51.66 38.75 75.01 1
915 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Nadangahat Piped Water Supply Scheme , SM/07801 Retrofitting Providing functional household tap connection (FHTC) from existing distribution system within the command area of Nadanghat piped water supply scheme at Kundapara village (37 nos FHTC) & Nadanghat village (75 nos FHTC), Purbasthali-I Block within Kalna Sub-Division under Burdwan Division, PHE Dte. (Sl No-B) Assistant Engineer ORD/000470/2021-2022 153/KSD 15/02/2022 15 MAA LAXMI ENTERPRISE 4.51 4.49 99.56 1
916 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Nadangahat Piped Water Supply Scheme , SM/07801 Retrofitting Hire & fuel charges of vehicle (Car No.-WB-04G-7127) for the office of the Assistant Engineer, Kalna Sub-Division, PHE Dte. for the month of December22 to February'23. BILL/00118/2023-2024 30/JJM 19/04/2023 PARTHA PRATIM ACHARYA 1.19 0.00 0 0
917 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Nadangahat Piped Water Supply Scheme , SM/07801 Retrofitting Conducting physical Household Survey at the IMIS reported village for HGJ certification and providing balance FHTC for Har Ghar Jal certification including conducting Gram Sabhas for different IMIS reported villages across the district under Burdwan Division, PHE Dte. AE(HQs),Assistant Engineer ,Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE.,Assistant Engineer, Durgapur Sub Division, P.H.E. Dte JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000428/2024-2025 3107/BWD 12/08/2024 90 TUBGRAM GRAMMYAK UNNAYAN SAMITY 309.60 0.00 0 50
918 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Jalahati Piped Water Supply Scheme at Purbasthali-I Block , SM/07803 Retrofitting Continuation work order for Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Jalahati village of Jalahati piped water supply scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. [Phase-I](Tr No.-768/BWD/2020-21) Assistant Engineer ORD/000387/2020-2021 4793/1/BWD 03/12/2020 30 SETH ENTERPRISE 4.92 4.92 100 1
919 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Jalahati Piped Water Supply Scheme at Purbasthali-I Block , SM/07803 Retrofitting Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Jalahati (P)village (Beltalapara habitation) of Jalahati Piped Water Supply Scheme within Kalna Sub-Divn. under Burdwan Division, PHE. Dte. (Part-A). [SL. No. : 24] Assistant Engineer ORD/000415/2020-2021 1465/BWD 18/02/2021 15 SETH ENTERPRISE 4.82 4.86 100.83 1
920 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Jalahati Piped Water Supply Scheme at Purbasthali-I Block , SM/07803 Retrofitting Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Jalahati (P) village (Beltalapara habitation) of Jalahati Piped Water Supply Scheme within Kalna Sub-Divn. under Burdwan Division, PHE. Dte. (Part-B). [SL. No. : 25] Assistant Engineer ORD/000414/2020-2021 1464/BWD 18/02/2021 15 YOUNG ENGINEERS CO.-OPERATIVE SOCIETY LTD. 4.86 4.86 100 1
921 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Jalahati Piped Water Supply Scheme at Purbasthali-I Block , SM/07803 Retrofitting Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Jalahati (P) village (Jalahati (P) habitation) of Jalahati Piped Water Supply Scheme within Kalna Sub-Divn. under Burdwan Division, PHE. Dte. [SL. No. : 26] Assistant Engineer ORD/000413/2020-2021 1462/BWD 18/02/2021 15 BARDHAMAN AQUA ENGINEERING 4.86 4.86 100 1
922 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Jalahati Piped Water Supply Scheme at Purbasthali-I Block , SM/07803 Retrofitting Providing 350 Nos. FHTC work at JALAHATI W/S scheme for Sajal Gram (As per Field Verification Report for Har Ghar Jal Certification) within Purbasthali-I Block including leftout household water tap connection (FHTC) under Burdwan Division, PHE Dte. Assistant Engineer ORD/000800/2022-2023 1520/BWD 28/03/2023 30 IYASIN DAFADAR 14.47 13.57 93.78 0
923 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Jalahati Piped Water Supply Scheme at Purbasthali-I Block , SM/07803 Retrofitting Construction of 350cum OHR & Other Allied Works in connection with Augmentation of (SM/07803), (SM/09410), (SM/16304), (SM/15172) & (SM/14020) Piped Water Supply Scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/001048/2024-2025 220/BWD 10/01/2025 270 R.K. MANDAL& CO. 491.79 0.00 0 1
924 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of MADHABPUR Piped Water Supply Scheme , SM/07862 Retrofitting Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Gureghar village and Gureghar habitation of Madhabpur piped water supply scheme within Burdwan Sub-Division under Burdwan Division, PHE Dte. [Phase-I](Tr No.-440/BWD/2020-21) Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000165/2020-2021 3332/BWD 18/09/2020 30 KAUSHIK RAY 4.87 4.87 100 1
925 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of MADHABPUR Piped Water Supply Scheme , SM/07862 Retrofitting Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Jarogram village and Jaragram habitation of Madhabpur piped water supply scheme within Burdwan Sub-Division under Burdwan Division, PHE Dte. [Phase-I](Tr No.-441/BWD/2020-21) Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000173/2020-2021 3333/BWD 18/09/2020 30 SUPRIYA RAY 4.87 4.87 100 1
926 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of MADHABPUR Piped Water Supply Scheme , SM/07862 Retrofitting Continuation work order for Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Jarogram village and Jarogram habitation of Madhabpur piped water supply scheme within Burdwan Sub-Division under Burdwan Division, PHE Dte. [Phase-I](Tr No.-662/BWD/2020-21) Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000259/2020-2021 4911/BWD 08/12/2020 30 SUPRIYA RAY 4.87 4.87 100 1
927 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of MADHABPUR Piped Water Supply Scheme , SM/07862 Retrofitting Continuation work order for Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Gureghar village and Gureghar habitation of Madhabpur piped water supply scheme within Burdwan Sub-Division under Burdwan Division, PHE Dte. [Phase-I](Tr No.-557/BWD/2020-21) Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000260/2020-2021 4910/BWD 08/12/2020 30 KAUSHIK RAY 4.87 4.87 100 1
928 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of MADHABPUR Piped Water Supply Scheme , SM/07862 Retrofitting Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Dumo village (Dumo habitation) & Satgoria village (Satgoria habitation) of Madhabpur Piped Water Supply Scheme within Burdwan Sub-Divn. under Burdwan Division, PHE. Dte. [SL. No. : 07] [Agr. No.721/BWD of 2020-2021] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000376/2020-2021 1418/BWD 18/02/2021 15 BRINDABAN KONAR 4.86 4.86 100 1
929 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of MADHABPUR Piped Water Supply Scheme , SM/07862 Retrofitting Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Madhabpur village and Madhabpur habitation of MADHABPUR Piped Water Supply Scheme within Burdwan Sub-Divn. under Burdwan Division, PHE. Dte. [Phase - I] [GROUP : ¿7C¿] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000847/2020-2021 3334/BWD 18/09/2020 30 KAJAL MUKHERJEE 4.86 4.86 100 1
930 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of MADHABPUR Piped Water Supply Scheme , SM/07862 Retrofitting Continuation work order for Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Mirzapur village (Mirzapur habitation) of Madhabpur Piped Water Supply Scheme within Burdwan Sub-Divn. under Burdwan Division, PHE. Dte. [SL. No. : 10] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000194/2021-2022 6189/BWD 28/10/2021 15 JAI MAA DURGA & CO. 2.19 2.19 100 1
931 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of MADHABPUR Piped Water Supply Scheme , SM/07862 Retrofitting Extension of uPVC pipeline for providing FHTC from existing distribution pipe line system within command area of MADHABPUR (Zone-II) W/S Scheme at Khalerpar under Gureghar village, Jamalpur Development Block under Burdwan Division, PHE Dte". Gr,B. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000562/2022-2023 2099/BSD 28/11/2022 30 PRATIMA CONSTRUCTION 0.90 0.90 100 1
932 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of MADHABPUR Piped Water Supply Scheme , SM/07862 Retrofitting Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Jargram (Part) village (Jargram (P) habitation) of Madhabpur Piped Water Supply Scheme within Burdwan Sub-Divn. under Burdwan Division, PHE. Dte. [SL. No. : 05] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000421/2020-2021 1416/BWD 18/02/2021 15 LAKSHMIKANTA DAS 4.86 4.86 100 1
933 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of MADHABPUR Piped Water Supply Scheme , SM/07862 Retrofitting Repairing of damaged 180 mm dia UPVC pipeline at Madhabpur village for Madhabpur water supply scheme within Jamalpur Block under Burdwan Division, PHE Dte.[Gr.-I] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000844/2020-2021 79/BSD 19/01/2021 30 KOUSIK MALLICK 4.82 4.70 97.51 1
934 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of MADHABPUR Piped Water Supply Scheme , SM/07862 Retrofitting Continuation work order for Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Madhabpur village and Madhabpur habitation of MADHABPUR Piped Water Supply Scheme within Burdwan Sub-Divn. under Burdwan Division, PHE. Dte. [Phase - I] [GROUP : ¿7C¿] AE(HQs),Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000846/2020-2021 7050/BWD 22/12/2020 30 KAJAL MUKHERJEE 4.86 4.49 92.39 1
935 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of MADHABPUR Piped Water Supply Scheme , SM/07862 Retrofitting Laying of damaged UPVC pipeline with HDPE pipes at Madhabpur village for Madhabpur Zone-I water supply scheme within Jamalpur Block under Burdwan Division, PHE Dte.[Gr.-G] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000534/2021-2022 1478/BSD 09/11/2021 30 KOUSIK MALLICK 3.57 3.56 99.72 1
936 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of MADHABPUR Piped Water Supply Scheme , SM/07862 Retrofitting Continuation work order for Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Jargram (Part) village (Jargram (P) habitation) of Madhabpur Piped Water Supply Scheme within Burdwan Sub-Divn. under Burdwan Division, PHE. Dte. [SL. No. : 05] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000027/2022-2023 2058/BWD 19/04/2022 15 LAKSHMIKANTA DAS 4.86 4.86 100 1
937 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of MADHABPUR Piped Water Supply Scheme , SM/07862 Retrofitting Extension of uPVC pipeline regarding FHTC for Gureghar, Dumo, Basantabati habitation under Madhabpur (Zone-II) W/S. Scheme at Jamalpur Development Block under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000160/2022-2023 3139/BWD 19/07/2022 30 PRATIMA CONSTRUCTION 5.64 5.53 98.05 1
938 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of MADHABPUR Piped Water Supply Scheme , SM/07862 Retrofitting Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Madhabpur (Part) village (Madhabpur (P) habitation) of Madhabpur Piped Water Supply Scheme within Burdwan Sub-Divn. under Burdwan Division, PHE. Dte. [SL. No. : 06] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000458/2020-2021 1417/BWD 18/02/2021 15 KAJAL MUKHERJEE 4.86 3.28 67.49 1
939 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of MADHABPUR Piped Water Supply Scheme , SM/07862 Retrofitting Sinking of 300 X 200mm dia Tube Well 150 mtr. Depth by D.R. Rig method using UPVC pipe (CD) and UPVC Deep Well Screen (RDS) for 3RD TW site of MADHABPUR (Z-I) W/S Scheme under Jamalpur Block within Burdwan Sub-Division, PHE Dte. ORD/000201/2023-2024 2704/BWD 08/06/2023 30 TULIP ENGINEERS CO-OPERATIVE SOCIETY LTD. 13.26 12.53 94.49 100
940 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of MADHABPUR Piped Water Supply Scheme , SM/07862 Retrofitting Preparation and Submission of DPR for Augmentation of MADHABPUR PWSS under Jamalpur Development Block under Burdwan Division, P.H.E Dte.[2nd Call] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000363/2023-2024 1525/BSD 17/07/2023 15 CARTO 0.78 0.77 98.72 100
941 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of MADHABPUR Piped Water Supply Scheme , SM/07862 Retrofitting Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Gureghar village (Gureghar habitation) of Madhabpur Piped Water Supply Scheme within Burdwan Sub-Divn. under Burdwan Division, PHE. Dte. (Part - A). [SL. No. : 08] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. Junior Engineer, R.W.S. Burdwan Sub Division, P.H.E. Dt ORD/000543/2020-2021 1419/BWD 18/02/2021 15 KAUSHIK RAY 4.87 4.87 100 0
942 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of MADHABPUR Piped Water Supply Scheme , SM/07862 Retrofitting Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Mirzapur village (Mirzapur habitation) of Madhabpur Piped Water Supply Scheme within Burdwan Sub-Divn. under Burdwan Division, PHE. Dte. [SL. No. : 10] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. Junior Engineer, R.W.S. Burdwan Sub Division, P.H.E. Dt ORD/000536/2020-2021 1421/BWD 18/02/2021 15 JAI MAA DURGA & CO. 4.86 4.86 100 0
943 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of MADHABPUR Piped Water Supply Scheme , SM/07862 Retrofitting Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Gureghar village (Gureghar habitation) of Madhabpur Piped Water Supply Scheme within Burdwan Sub-Divn. under Burdwan Division, PHE. Dte. (Part - B). [SL. No. : 09] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. Junior Engineer, R.W.S. Burdwan Sub Division, P.H.E. Dt ORD/000460/2020-2021 1420/BWD 18/02/2021 15 SAIKAT RAY 4.87 4.87 100 0
944 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of MADHABPUR Piped Water Supply Scheme , SM/07862 Retrofitting Extension of pipeline for providing functional household tap connection at Gureghar village of MADHABPUR Zone-II piped water supply scheme within Burdwan Sub-Division under Burdwan Division, PHE Dte. [Gr.-A] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. Junior Engineer, R.W.S. Burdwan Sub Division, P.H.E. Dt ORD/000234/2021-2022 1128/BSD 26/08/2021 45 SAIKAT RAY 1.40 1.25 89.29 0
945 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of MADHABPUR Piped Water Supply Scheme , SM/07862 Retrofitting Construction of switch rooms & Rising main at different TW site for MADHABPUR (Zone-I) Piped Water Supply Scheme under Jamalpur Block, District:- Purba-Bardhaman under Burdwan Division, PHE. Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. RWS_JAMALPUR ORD/000532/2023-2024 3629/BWD 21/08/2023 60 DEBJYOTI GOSWAMI 9.11 2.64 28.98 80
946 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Adra Piped Water Supply Scheme at Galsi-II Block , SM/07829 Retrofitting Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Adra village (Adrahati habitation) of ADRA Piped Water Supply Scheme within Durgapur Sub-Divn. under Burdwan Division, PHE. Dte. (Part - A) [SL. No. : 05] [Agr. No. 745/BWD of 2020-2021] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000379/2020-2021 584/BWD 25/01/2021 15 GENUINE ENGINEERING CO-OP. SOCIETY LTD. 4.86 0.00 0 1
947 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Adra Piped Water Supply Scheme at Galsi-II Block , SM/07829 Retrofitting Continuation work order for Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Adra village (Adrahati habitation) of ADRA Piped Water Supply Scheme within Durgapur Sub-Divn. under Burdwan Division, PHE. Dte. (Part - A) [SL. No. : 05] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000204/2021-2022 6264/BWD 02/11/2021 15 GENUINE ENGINEERING CO-OP. SOCIETY LTD. 4.86 4.86 100 1
948 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Adra Piped Water Supply Scheme at Galsi-II Block , SM/07829 Retrofitting Continuation work order for Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Adra village (Adrahati habitation) of ADRA Piped Water Supply Scheme within Durgapur Sub-Divn. under Burdwan Division, PHE. Dte. (Part - C) [SL. No. : 07] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000216/2021-2022 6194/BWD 28/10/2021 15 LAKSHMIKANTA DAS 4.86 4.86 100 1
949 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Adra Piped Water Supply Scheme at Galsi-II Block , SM/07829 Retrofitting Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Mohara vilage (Mohara habitation) of ADRA Piped W/S Scheme within Durgapur (Bardhaman North) Sub-Division under Burdwan Division, P.H.E. Dte. [Gr.-E] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000241/2021-2022 673/DSD 29/11/2021 21 KOUSIK MALLICK 4.83 4.83 100 1
950 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Adra Piped Water Supply Scheme at Galsi-II Block , SM/07829 Retrofitting Providing Functional Household Tap Connection (FHTC) from distribution system within the command area of ADRA Water Supply Scheme at Adra (Part), Mohara (Part), Kaitara and Patrahati village under JAL SAPNO MISSION under Galsi-II Block in Purba Bardhanan District under Burdwan Division, P.H.E. Dte. Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000415/2021-2022 384/BWD 20/01/2022 60 SHUBHRA KANTI GHOSH 69.37 30.00 43.25 1
951 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Adra Piped Water Supply Scheme at Galsi-II Block , SM/07829 Retrofitting Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Adra village (Adrahati habitation) of ADRA Piped Water Supply Scheme within Durgapur Sub-Divn. under Burdwan Division, PHE. Dte. (Part - B) [SL. No. : 06] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000462/2020-2021 585/BWD 25/01/2021 15 BASUNDHARA SOLUTION 4.86 4.86 100 1
952 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Adra Piped Water Supply Scheme at Galsi-II Block , SM/07829 Retrofitting Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Bagila village (Bagila Habitation) of Bagila piped water supply scheme within Burdwan Sub-Division under Burdwan Division, PHE Dte.(Part-B)[SL NO.-09] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE.,Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000746/2020-2021 585./BWD 25/01/2021 15 HAMID SK 4.87 0.00 0 1
953 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Adra Piped Water Supply Scheme at Galsi-II Block , SM/07829 Retrofitting Relaying and repairing of distribution after widening of PWD road in between Chainage 8.40 km to 10.74 km of Galsi Gohogram road between Node 74 to Node 117 within Adra W/S Scheme at Durgapur Sub-Division in Galsi-II Block under Burdwan Division, P.H.E. Dte.[Gr.-D] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000333/2021-2022 03/DSD 03/01/2022 30 SHUBHRA KANTI GHOSH 4.82 0.00 0 1
954 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Adra Piped Water Supply Scheme at Galsi-II Block , SM/07829 Retrofitting Connecting, relaying and repairing of distribution main towards Irkona (Node 4 to Node 18) and Mohora village Node 157 to Node 163 with newly reoriented line (from Chainage 8.40 km to 10.74 km of Galsi Gohogram road and from Node 152 to Node 157 beside PMGSY road) within Adra W/S Scheme at Durgapur Sub-Division in Galsi-II Block under Burdwan Division, P.H.E. Dte. (Gr.-'E') Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000966/2020-2021 554/DSD 22/12/2020 21 PAL CONSTRUCTION 2.10 0.00 0 1
955 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Adra Piped Water Supply Scheme at Galsi-II Block , SM/07829 Retrofitting Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Mohara (Part), Kaitara (Part) and Khanhati (Part) Village of Adra Piped W/S Scheme within Durgapur (Bardhaman North) Sub-Division under Burdwan Division, P.H.E. Dte. [Gr.-A] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000129/2022-2023 342/DSD 30/06/2022 21 SHUBHRA KANTI GHOSH 4.82 4.82 100 1
956 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Adra Piped Water Supply Scheme at Galsi-II Block , SM/07829 Retrofitting Sinking of 200 mm dia. River Bank Tube Well 60 mtr. Depth by D.R. Rig method using UPVC pipe (CM) and UPVC Deep Well Screen (RMS) at Gohogram village Block -Galsi-II, Dist - Purba Bardhaman under Durgapur Sub Division, PHE Dte. [Gr.-A] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000269/2022-2023 494/DSD 12/08/2022 21 KOUSIK MALLICK 4.35 0.00 0 1
957 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Adra Piped Water Supply Scheme at Galsi-II Block , SM/07829 Retrofitting Sinking of 200 mm dia River Bank Tube Well 60 mtr. Depth by D.R. Rig method using UPVC pipe (CM) and UPVC Deep Well Screen (RMS) at Simasimi village Block -Galsi-I, Dist - Purba Bardhaman under Durgapur Sub Division, PHE Dte. [Gr.-B] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000270/2022-2023 495/DSD 12/08/2022 21 MUNSHI JAVEDUR JAMAN 4.35 0.00 0 1
958 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Adra Piped Water Supply Scheme at Galsi-II Block , SM/07829 Retrofitting Extension of UPVC pipe line of LDS at Kaitara, Patrahati and Mahara Mouza for providing FHTC of Adra and its adjoining mouzas W/S Scheme under Durgapur Sub-Division, Burdwan Division, P.H.E. Dte. [Gr.-E] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000273/2022-2023 498/DSD 12/08/2022 30 SHUBHRA KANTI GHOSH 4.81 4.78 99.38 1
959 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Adra Piped Water Supply Scheme at Galsi-II Block , SM/07829 Retrofitting Extension of UPVC pipe line of LDS at Khanhati and Patrahati Mouza for providing FHTC of Adra and its adjoining mouzas W/S Scheme under Durgapur Sub-Division, Burdwan Division, P.H.E. Dte.[SL-23] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer2, Durgapur Sub-Division, PHE Dte. ORD/000844/2022-2023 706/DSD 31/12/2022 30 UTPAL NANDI 4.46 4.44 99.55 0
960 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Adra Piped Water Supply Scheme at Galsi-II Block , SM/07829 Retrofitting Carriage of withdrawal stacked DI pipes of rising main from Adrahati to Barsul Divisional store and restoration of damaged pipeline of distribution main for construction of drain, concrete road etc at various point at Khanhati village for providing FHTC within Adra W/S Scheme in Galsi-II Block under Durgapur Sub Division, P.H.E. Dte. [SL-06] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer2, Durgapur Sub-Division, PHE Dte. ORD/000879/2022-2023 732/DSD 30/12/2022 21 SHUBHRA KANTI GHOSH 0.61 0.00 0 25
961 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Adra Piped Water Supply Scheme at Galsi-II Block , SM/07829 Retrofitting Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Kaitara (Part) Village of Adra Piped W/S Scheme within Durgapur (Bardhaman North) Sub-Division under Burdwan Division, P.H.E. Dte. [SL-11] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer2, Durgapur Sub-Division, PHE Dte. ORD/000889/2022-2023 736/DSD 30/12/2022 21 SHUBHRA KANTI GHOSH 0.96 0.00 0 100
962 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Adra Piped Water Supply Scheme at Galsi-II Block , SM/07829 Retrofitting Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Mohara (Part) Village of Adra Piped W/S Scheme within Durgapur (Bardhaman North) Sub-Division under Burdwan Division, P.H.E. Dte. [SL-12] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer2, Durgapur Sub-Division, PHE Dte. ORD/000888/2022-2023 737/DSD 30/12/2022 21 SHUBHRA KANTI GHOSH 0.94 0.00 0 100
963 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Adra Piped Water Supply Scheme at Galsi-II Block , SM/07829 Retrofitting Restoration and relaying of damaged pipeline of distribution main for construction of drain, concrete road etc at Ruidaspara (South end) of Adra village for providing left out FHTC at Ruidaspara (South end) within Adra W/S Scheme in Galsi-II Block under Burdwan Division, P.H.E. Dte.[SL-12] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer2, Durgapur Sub-Division, PHE Dte. ORD/000036/2023-2024 160/DSD 13/04/2023 21 SHUBHRA KANTI GHOSH 0.96 0.00 0 100
964 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Adra Piped Water Supply Scheme at Galsi-II Block , SM/07829 Retrofitting Providing left out FHTC for making Swajal Gram at Khanhati village within Adra Water supply Scheme in Galsi-II Block under Burdwan Division, P.H.E. Dte.[SL-09] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer2, Durgapur Sub-Division, PHE Dte. ORD/000033/2023-2024 157/DSD 13/04/2023 21 SHUBHRA KANTI GHOSH 0.97 0.00 0 100
965 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Adra Piped Water Supply Scheme at Galsi-II Block , SM/07829 Retrofitting Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of ADRA Piped Water Supply Scheme at Kaitara village, Galsi-II Block within Durgapur (Burdwan North) Sub Division under Burdwan Division, P.H.E. Dte. [SL-9] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer2, Durgapur Sub-Division, PHE Dte. ORD/000882/2022-2023 735/DSD 30/12/2022 21 SHUBHRA KANTI GHOSH 0.97 0.00 0 100
966 PURBA BARDHAMAN Durgapur W/S Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Adra Piped Water Supply Scheme at Galsi-II Block , SM/07829 Retrofitting Material Requisition To Resource Division RTOR000043/2024-2025 463/DWSD 17/03/2025 Resource Division 0.14 0.00 0 0
967 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Kasiara Piped Water Supply Scheme atMangolkote Block , SM/07811 Retrofitting Continuation work order for Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Chanak village of Kashiara piped water supply scheme within Katwa Sub-Division under Burdwan Division, PHE Dte. [Phase-I](Tr No.-259/BWD/2020-21) Assistant Engineer JUNIOR ENGINEER R.W.S. BURDWAN SUB-DIVISION PHE DTE ORD/000246/2020-2021 3412/BWD 22/09/2020 30 BABUL SK 4.92 4.92 100 1
968 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Kasiara Piped Water Supply Scheme atMangolkote Block , SM/07811 Retrofitting Continuation work order for Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Kashiara village of Kasiara piped water supply scheme within Katwa Sub-Division under Burdwan Division, PHE Dte. [Phase-I](Tr No.-260/BWD/2020-21) AE(HQs) J.E. 2 BURDWAN ORD/000245/2020-2021 341/BWD 22/09/2020 30 HAMID SK 4.92 4.92 100 1
969 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Kasiara Piped Water Supply Scheme atMangolkote Block , SM/07811 Retrofitting Formal Work Order for Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of Kashira Piped Water Supply Scheme at Chanak (Part), Gopalbera, Krishnapur, Gatistha & Kashira (Part) Village (Mouza), Mongolkot Block under Burdwan Division, PHE Dte. (Agreement No. 99/SE/CC/PHE/Dte of 2020-2021) AE(HQs) J.E. 2 BURDWAN ORD/000418/2020-2021 915/BWD 02/02/2021 60 MAJUMDER ENTERPRISE 53.52 32.62 60.95 0
970 PURBA BARDHAMAN Burdwan Division Augmentation of ground water based SEHARA PWSS to accommodate FHTC in RAINA-I Block under Burdwan Suv Division of Burdwan Division in Purba Bardhaman , SM/09408 Augmentation Supply of materials for different water supply scheme under Burdwan Division, PHE Dte. VCH/001578/2021-2022 1207/DW 10/03/2022 EXECUTIVE ENGINEER, RESOURCES DIVISION, P.H.E. DTE. 3,005.00 0.00 0 0
971 PURBA BARDHAMAN Burdwan Division Augmentation of ground water based SEHARA PWSS to accommodate FHTC in RAINA-I Block under Burdwan Suv Division of Burdwan Division in Purba Bardhaman , SM/09408 Augmentation Route Survey & Preparation of DPR for Sehara W/S Scheme under Raina-I Block under Burdwan Sub-Division under Burdwan Division PHE Dte. Sl No.9 Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000497/2021-2022 184/BSD 31/01/2022 30 RADIANT 2.85 2.85 100 1
972 PURBA BARDHAMAN Burdwan Division Augmentation of ground water based SEHARA PWSS to accommodate FHTC in RAINA-I Block under Burdwan Suv Division of Burdwan Division in Purba Bardhaman , SM/09408 Augmentation Sinking of 300 X 200mm dia Tube Well 150 mtr. Depth by D.R. Rig method using UPVC pipe (CM) and UPVC Medium Well Screen (RMS) for Augmentation of SEHARA & its adjoining mouzas Piped Water Supply Scheme, Block ¿ Raina ¿ I, Dist - Purba Bardhaman under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000537/2022-2023 5025/BWD 10/11/2022 30 M/S D. PALIT & CO. 10.06 8.26 82.11 1
973 PURBA BARDHAMAN Burdwan Division Augmentation of ground water based SEHARA PWSS to accommodate FHTC in RAINA-I Block under Burdwan Suv Division of Burdwan Division in Purba Bardhaman , SM/09408 Augmentation Material Requisition To Resource Division RTOR000212/2021-2022 1535/BWD 15/03/2022 Resource Division 0.37 0.00 0 0
974 PURBA BARDHAMAN Burdwan Division Augmentation of ground water based SEHARA PWSS to accommodate FHTC in RAINA-I Block under Burdwan Suv Division of Burdwan Division in Purba Bardhaman , SM/09408 Augmentation Material Requisition To Resource Division RTOR000045/2021-2022 536/BWD 27/01/2022 Resource Division 15.56 0.00 0 0
975 PURBA BARDHAMAN Burdwan Division Augmentation of ground water based SEHARA PWSS to accommodate FHTC in RAINA-I Block under Burdwan Suv Division of Burdwan Division in Purba Bardhaman , SM/09408 Augmentation Material Requisition To Resource Division RTOR000091/2021-2022 902/BWD 15/02/2022 Resource Division 13.85 0.00 0 0
976 PURBA BARDHAMAN Burdwan Division Augmentation of ground water based SEHARA PWSS to accommodate FHTC in RAINA-I Block under Burdwan Suv Division of Burdwan Division in Purba Bardhaman , SM/09408 Augmentation Augmentation of SEHARA Piped Water Supply Scheme with LDS, Rising Main, Construction of 350 Cum capacity OHR with 20.0 Mtr. Staging height inclusive of soil test & FHTC under Raina ¿ I Block, District - Purba Bardhaman. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000599/2021-2022 1473/BWD 14/03/2022 360 M/S PIONEER CONSTRUCTION 430.73 364.82 84.7 100
977 PURBA BARDHAMAN Burdwan Division Augmentation of ground water based SEHARA PWSS to accommodate FHTC in RAINA-I Block under Burdwan Suv Division of Burdwan Division in Purba Bardhaman , SM/09408 Augmentation Construction of Pump House cum chlorine room without sanitary and water supply arrangement at TubeWell Site to departmental drawing no-PHE/BD/P.H/DRG/02/DEC-17 (Size3.60mtr x 3.00mtr room) for SEHARA its Adjoining Mouza W/S Scheme, Block -Raina-I within Burdwan Sub-Division, PHE Dte. (Mouza- Sehara)_2ND CALL Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000576/2023-2024 2041/BSD 24/08/2023 45 ANWESHA CONSTRUCTION 3.21 2.87 89.41 100
978 PURBA BARDHAMAN Burdwan Division Augmentation of MANTESWAR PWSS for providing functional household tap connection FHTC in Manteswar block under Burdwan Division in Purba Bardhaman District , SM/09414 Augmentation Preparation of DPR for augmentation of Monteswar W/S Scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. (Sl No-F) Assistant Engineer ORD/000572/2021-2022 208/KSD 23/02/2022 21 INDRANIL DUTTA & ASSOCIATES 2.75 2.73 99.27 1
979 PURBA BARDHAMAN Burdwan Division Augmentation of MANTESWAR PWSS for providing functional household tap connection FHTC in Manteswar block under Burdwan Division in Purba Bardhaman District , SM/09414 Augmentation Supply of materials for different water supply scheme under Burdwan Division, PHE Dte. VCH/001578/2021-2022 1207/DW 10/03/2022 EXECUTIVE ENGINEER, RESOURCES DIVISION, P.H.E. DTE. 3,005.00 0.00 0 0
980 PURBA BARDHAMAN Burdwan Division Augmentation of MANTESWAR PWSS for providing functional household tap connection FHTC in Manteswar block under Burdwan Division in Purba Bardhaman District , SM/09414 Augmentation Supply and delivery of different dia. CIDF sluice valve for Augmentation of Jahannagar, Ganganandapur, Nowapara & Monteswar Piped Water Supply Scheme within Kalna Sub-Division under Burdwan Division, P.H.E. Dte.[Part B] Assistant Engineer ORD/000357/2022-2023 3728/BWD 30/08/2022 20 NANDY UDYOG 2.88 2.88 100 1
981 PURBA BARDHAMAN Burdwan Division Augmentation of MANTESWAR PWSS for providing functional household tap connection FHTC in Manteswar block under Burdwan Division in Purba Bardhaman District , SM/09414 Augmentation Supply and delivery of different dia. CIDF sluice valve for Augmentation of Jahannagar, Ganganandapur, Nowapara & Monteswar Piped Water Supply Scheme within Kalna Sub-Division under Burdwan Division, P.H.E. Dte.[Part ¿ A] Assistant Engineer ORD/000323/2022-2023 3632/BWD 22/08/2022 20 RAMASISH ENTERPRISE 12.80 0.00 0 1
982 PURBA BARDHAMAN Burdwan Division Augmentation of MANTESWAR PWSS for providing functional household tap connection FHTC in Manteswar block under Burdwan Division in Purba Bardhaman District , SM/09414 Augmentation Work Order for "Surging of existing 300 x 200 mm dia Tube Well depth 123 mtr & lowering of part tube well 200 x 150 mm dia depth , existing 300 x 200 mm dia tube well at Manteswar zone-I under Kalna Sub-Division , PHE Dte." JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000551/2023-2024 1306/KSD 23/08/2023 30 SUSUNIA GP CO. OPERATIVE LABOUR CONTRACT AND CONSTRUCTION SOCIETY LTD. 4.20 4.16 99.05 100
983 PURBA BARDHAMAN Burdwan Division Augmentation of MANTESWAR PWSS for providing functional household tap connection FHTC in Manteswar block under Burdwan Division in Purba Bardhaman District , SM/09414 Augmentation Material Requisition To Resource Division RTOR000049/2021-2022 563/BWD 27/01/2022 Resource Division 14.37 0.00 0 0
984 PURBA BARDHAMAN Burdwan Division Augmentation of MANTESWAR PWSS for providing functional household tap connection FHTC in Manteswar block under Burdwan Division in Purba Bardhaman District , SM/09414 Augmentation Sinking of 250 X 150mm dia Tube Well 150 mtr. Depth by D.R. Rig method using UPVC pipe (CM) and UPVC Deep Well Screen (RMS) for 1ST TW Site of Aug. of MONTESWAR & its adjoining mouzas Piped Water Supply Scheme, Block ? Monteswar, Dist - Purba Bardhaman under Burdwan Division, PHE Dte. Assistant Engineer ORD/000550/2022-2023 5178/BWD 23/11/2022 30 ANIRUDDHA FARUQUE 8.73 3.95 45.25 100
985 PURBA BARDHAMAN Burdwan Division Augmentation of MANTESWAR PWSS for providing functional household tap connection FHTC in Manteswar block under Burdwan Division in Purba Bardhaman District , SM/09414 Augmentation Augmentation of MANTESHWAR Piped Water Supply Scheme with LDS, FHTC, Rising Main, Construction of 300 Cum capacity OHR with 20.0 Mtr. Staging height inclusive of soil investigation & boundary wall construction at 2nd TW site under Monteswar Block, District - Purba Bardhaman. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000008/2022-2023 1938/BWD 11/04/2022 365 CHIRANJIB DAS 341.15 255.48 74.89 50
986 PURBA BARDHAMAN Burdwan Division Augmentation of MANTESWAR PWSS for providing functional household tap connection FHTC in Manteswar block under Burdwan Division in Purba Bardhaman District , SM/09414 Augmentation Quotation for new service connection charges of Monteswar PWSS.[PH No.-3] BILL/01126/2023-2024 1085/JJM 20/12/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LTD. 4.99 0.00 0 0
987 PURBA BARDHAMAN Burdwan Division Augmentation of MANTESWAR PWSS for providing functional household tap connection FHTC in Manteswar block under Burdwan Division in Purba Bardhaman District , SM/09414 Augmentation Ancillary work for augmentation of MANTESWAR Water Supply Scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000681/2023-2024 4242/BWD 26/09/2023 357 PAPRI HAZRA 39.30 0.00 0 1
988 PURBA BARDHAMAN Burdwan Division DETAILED PROJECT REPORT FOR AUGMENTATION OF DOGACHIA PWSS FOR PROVIDING FUNCTIONAL HOUSEHOLD TAP CONNECTION (FHTC) PURBASTHALI-I BLOCK PURBA BARDHAMAN WEST BENGAL , SM/09415 Augmentation Supply of materials for different water supply scheme under Burdwan Division, PHE Dte. VCH/001578/2021-2022 1207/DW 10/03/2022 EXECUTIVE ENGINEER, RESOURCES DIVISION, P.H.E. DTE. 3,005.00 0.00 0 0
989 PURBA BARDHAMAN Burdwan Division DETAILED PROJECT REPORT FOR AUGMENTATION OF DOGACHIA PWSS FOR PROVIDING FUNCTIONAL HOUSEHOLD TAP CONNECTION (FHTC) PURBASTHALI-I BLOCK PURBA BARDHAMAN WEST BENGAL , SM/09415 Augmentation Preparation of DPR for augmentation of Dogachia W/S Scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. (Sl No-H) Assistant Engineer ORD/000574/2021-2022 210/KSD 23/02/2022 21 ROY CHOWDHURY ASSOCIATES 2.62 2.65 101.15 1
990 PURBA BARDHAMAN Burdwan Division DETAILED PROJECT REPORT FOR AUGMENTATION OF DOGACHIA PWSS FOR PROVIDING FUNCTIONAL HOUSEHOLD TAP CONNECTION (FHTC) PURBASTHALI-I BLOCK PURBA BARDHAMAN WEST BENGAL , SM/09415 Augmentation Supply and delivery of different dia. CIDF sluice valve for Augmentation of DOGACHIA Piped Water Supply Scheme under Burdwan Division, P.H.E. Dte._SL.No-08 Assistant Engineer ORD/000619/2021-2022 142/AE/HQ 16/03/2022 10 MAKALI ENGINEERING CORPORATION 4.52 0.00 0 0
991 PURBA BARDHAMAN Burdwan Division DETAILED PROJECT REPORT FOR AUGMENTATION OF DOGACHIA PWSS FOR PROVIDING FUNCTIONAL HOUSEHOLD TAP CONNECTION (FHTC) PURBASTHALI-I BLOCK PURBA BARDHAMAN WEST BENGAL , SM/09415 Augmentation Sinking of 250 X 150mm dia Tube Well 150 mtr. Depth by D.R. Rig method using UPVC pipe (CM) and UPVC Deep Well Screen (RMS) for 2nd TW Site of Aug. of DOGACHHIA & its adjoining mouzas Piped Water Supply Scheme, Block ? Purbasthali ? I, Dist - Purba Bardhaman under Burdwan Division, PHE Dte. Assistant Engineer ORD/000547/2022-2023 5129/BWD 21/11/2022 30 MUNSHI ENTERPRISE 8.72 7.89 90.48 0
992 PURBA BARDHAMAN Burdwan Division DETAILED PROJECT REPORT FOR AUGMENTATION OF DOGACHIA PWSS FOR PROVIDING FUNCTIONAL HOUSEHOLD TAP CONNECTION (FHTC) PURBASTHALI-I BLOCK PURBA BARDHAMAN WEST BENGAL , SM/09415 Augmentation Material Requisition To Resource Division RTOR000149/2021-2022 1247/BWD 07/03/2022 Resource Division 4.19 0.00 0 0
993 PURBA BARDHAMAN Burdwan Division DETAILED PROJECT REPORT FOR AUGMENTATION OF DOGACHIA PWSS FOR PROVIDING FUNCTIONAL HOUSEHOLD TAP CONNECTION (FHTC) PURBASTHALI-I BLOCK PURBA BARDHAMAN WEST BENGAL , SM/09415 Augmentation Material Requisition To Resource Division RTOR000043/2021-2022 541/BWD 27/01/2022 Resource Division 9.17 0.00 0 0
994 PURBA BARDHAMAN Burdwan Division DETAILED PROJECT REPORT FOR AUGMENTATION OF DOGACHIA PWSS FOR PROVIDING FUNCTIONAL HOUSEHOLD TAP CONNECTION (FHTC) PURBASTHALI-I BLOCK PURBA BARDHAMAN WEST BENGAL , SM/09415 Augmentation Material Requisition To Resource Division RTOR000206/2021-2022 1529/BWD 15/03/2022 Resource Division 0.37 0.00 0 0
995 PURBA BARDHAMAN Burdwan Division DETAILED PROJECT REPORT FOR AUGMENTATION OF DOGACHIA PWSS FOR PROVIDING FUNCTIONAL HOUSEHOLD TAP CONNECTION (FHTC) PURBASTHALI-I BLOCK PURBA BARDHAMAN WEST BENGAL , SM/09415 Augmentation Material Requisition To Resource Division RTOR000104/2021-2022 949/BWD 17/02/2022 Resource Division 14.44 0.00 0 0
996 PURBA BARDHAMAN Burdwan Division DETAILED PROJECT REPORT FOR AUGMENTATION OF DOGACHIA PWSS FOR PROVIDING FUNCTIONAL HOUSEHOLD TAP CONNECTION (FHTC) PURBASTHALI-I BLOCK PURBA BARDHAMAN WEST BENGAL , SM/09415 Augmentation Additional work to implement augmentation of DOGACHHIA Water Supply Scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000929/2023-2024 5512/BWD 14/12/2023 30 PARTHA PRATIM ACHARYA 9.39 0.00 0 100
997 PURBA BARDHAMAN Burdwan Division DETAILED PROJECT REPORT FOR AUGMENTATION OF DOGACHIA PWSS FOR PROVIDING FUNCTIONAL HOUSEHOLD TAP CONNECTION (FHTC) PURBASTHALI-I BLOCK PURBA BARDHAMAN WEST BENGAL , SM/09415 Augmentation Sinking of tube well, laying dist. system, construction of pump house and laying rising main of DOGACHIA Piped Water Supply Scheme with Kalna Sub-Division under Burdwan Division, PHE. Dte. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000877/2023-2024 5337/BWD 04/12/2023 120 MITRA CONSTRUCTION 78.72 0.00 0 20
998 PURBA BARDHAMAN Burdwan Division DETAILED PROJECT REPORT FOR AUGMENTATION OF DOGACHIA PWSS FOR PROVIDING FUNCTIONAL HOUSEHOLD TAP CONNECTION (FHTC) PURBASTHALI-I BLOCK PURBA BARDHAMAN WEST BENGAL , SM/09415 Augmentation Quotation from WBSEDCL for Augmentation of Dogachia water supply scheme for Pump House No.-4 under Burdwan Division, PHE Dte. BILL/00365/2024-2025 566/JJM 23/07/2024 WBSEDCL 8.89 0.00 0 0
999 PURBA BARDHAMAN Burdwan Division DETAILED PROJECT REPORT FOR AUGMENTATION OF DOGACHIA PWSS FOR PROVIDING FUNCTIONAL HOUSEHOLD TAP CONNECTION (FHTC) PURBASTHALI-I BLOCK PURBA BARDHAMAN WEST BENGAL , SM/09415 Augmentation Quotation from WBSEDCL for Augmentation of Dogachia water supply scheme for Pump House No.-3 under Burdwan Division, PHE Dte. BILL/00366/2024-2025 567/JJM 23/07/2024 WBSEDCL 7.63 0.00 0 0
1000 PURBA BARDHAMAN Burdwan Division DETAILED PROJECT REPORT FOR AUGMENTATION OF DOGACHIA PWSS FOR PROVIDING FUNCTIONAL HOUSEHOLD TAP CONNECTION (FHTC) PURBASTHALI-I BLOCK PURBA BARDHAMAN WEST BENGAL , SM/09415 Augmentation Augmentation of DOGACHIA Piped Water Supply Scheme with LDS, FHTC, Rising Main, Construction of 200 Cum capacity OHR with 20.0 Mtr. Staging height inclusive of soil investigation & boundary wall construction at 2nd TW site under Purbasthali ¿ I Block, District - Purba Bardhaman. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000678/2021-2022 1809/BWD 31/03/2022 360 MITRA CONSTRUCTION 226.14 160.79 71.1 60
1001 PURBA BARDHAMAN Burdwan Division Providing Functional House hold Tap Connection (FHTC) by retrofitting within the command area of Gobindapur piped Water Supply Scheme at Memari-I Block under Burdwan Division, P.H.E. DTE. , SM/08706 Retrofitting Providing FHTC from dist. System within the command area of GOBINDAPUR Piped Water Supply Scheme at Gobindapur (Part), Ichabacha, Taherpur, Dangapara, Purba Kashiara (Part), Matdanga, Chilinda, Sitarampur Village at Memari-I Development Block under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000373/2021-2022 210/BWD 11/01/2022 30 A R TRADERS 28.37 28.37 100 1
1002 PURBA BARDHAMAN Burdwan Division Providing Functional House hold Tap Connection (FHTC) by retrofitting within the command area of Gobindapur piped Water Supply Scheme at Memari-I Block under Burdwan Division, P.H.E. DTE. , SM/08706 Retrofitting Emergent 56 Nos. Street Stand Post closed for FHTC Work under Gobindapur Piped Water Supply Scheme (Retro Fittings) under Burdwan Sub-Divn.within Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000582/2022-2023 1974/BSD 16/11/2022 15 A R TRADERS 0.24 0.24 100 1
1003 PURBA BARDHAMAN Burdwan Division Providing Functional House hold Tap Connection (FHTC) by retrofitting within the command area of Gobindapur piped Water Supply Scheme at Memari-I Block under Burdwan Division, P.H.E. DTE. , SM/08706 Retrofitting Beautification of PWSS with Land filling and arboriculture of Head Works site & 2nd pump house Gobindapur Pwss under memari-i Development Block under Burdwan Division, PHE Dte. JUNIOR ENGINEER RWS BURDWAN SUB-DIVISION PHE DTE ORD/000547/2024-2025 278/RWS 03/09/2024 10 MUNSHI JAVEDUR JAMAN 0.97 0.00 0 0
1004 PURBA BARDHAMAN Burdwan Division Providing Functional House hold Tap Connection (FHTC) by retrofitting within the command area of Gobindapur piped Water Supply Scheme at Memari-I Block under Burdwan Division, P.H.E. DTE. , SM/08706 Retrofitting Extension of pipeline for GOBINDAPUR Piped Water Supply Scheme (Gobindapur Ichabacha, Taherpur, Dangapara, Purba Kashiara, Matdanga, Chilinda, Sitarampur village) within MEMARI- I Block including leftout house hold water tap connection (FHTC) under Burdwan Division, PHE. Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. Junior Engineer, RWS, Memari-I Dev. Bolck ORD/000053/2022-2023 2231/BWD 29/04/2022 30 J. K. CORPORATION 18.06 14.53 80.45 90
1005 PURBA BARDHAMAN Burdwan Division Providing Functional House hold Tap Connection (FHTC) by retrofitting at Srikhanda mouza within the command area of Srikhanda piped Water Supply Scheme at Katwa-I Block under Burdwan Division, P.H.E. DTE. (Pt.-B) , SM/08716 Retrofitting Supplying, laying and commissioning of Rising main at pump no. - 2 of Srikhanda PWSS under Katwa Sub-Division under Burdwan Division, PHE Dte. [Sl No-07] Assistant Engineer JUNIOR ENGINEER KATWA SUB-DIVISION PHE DTE ORD/000161/2022-2023 444/KTS 27/06/2022 30 ASHOK KUMAR GHOSH 1.84 1.84 100 1
1006 PURBA BARDHAMAN Burdwan Division Providing Functional House hold Tap Connection (FHTC) by retrofitting at Srikhanda mouza within the command area of Srikhanda piped Water Supply Scheme at Katwa-I Block under Burdwan Division, P.H.E. DTE. (Pt.-B) , SM/08716 Retrofitting Sinking of 300 X 200mm dia Tube Well 200 mtr. Depth by D.R. Rig method using UPVC pipe (CM) and UPVC Medium Well Screen (RMS) for Augmentation of SRIKHANDA and its adjoining mouzas Piped Water Supply Scheme, Block Katwa I, Dist - Purba Bardhaman under Burdwan Division, PHE Dte. Assistant Engineer JUNIOR ENGINEER KATWA SUB-DIVISION PHE DTE ORD/000669/2022-2023 388/BWD 31/01/2023 30 SUBODH KUMAR MONDAL 11.81 8.54 72.31 100
1007 PURBA BARDHAMAN Burdwan Division Providing Functional House hold Tap Connection (FHTC) by retrofitting at Srikhanda mouza within the command area of Srikhanda piped Water Supply Scheme at Katwa-I Block under Burdwan Division, P.H.E. DTE. (Pt.-B) , SM/08716 Retrofitting Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of SRIKHANDA Piped Water Supply Scheme at Katwa - I Block under Burdwan Division, PHE Dte.(Agreement No. 53/2020-2021 OF SE/CC/PHE. DTE.) Assistant Engineer ORD/000121/2020-2021 4880/BWD 07/12/2020 90 ASHOK KUMAR GHOSH 96.84 58.50 60.41 1
1008 PURBA BARDHAMAN Burdwan Division Providing Functional House hold Tap Connection (FHTC) by retrofitting at Srikhanda mouza within the command area of Srikhanda piped Water Supply Scheme at Katwa-I Block under Burdwan Division, P.H.E. DTE. (Pt.-B) , SM/08716 Retrofitting Construction of Pump House cum switch room (5.40 m x 3.60 m) with sanitary arrangement [As per Drawing No. : PHE/SE/CC/PH/DWG-01/2022-23] for additional TW. No - I(Beside BPHC) under Srikhanda PWSS (SM/08716) of Katwa-I Block under Katwa Sub-Division PHE Dte. Assistant Engineer ORD/000015/2025-2026 1230/BWD 22/04/2025 60 BABUL SK 6.75 0.00 0 0
1009 PURBA BARDHAMAN Burdwan Division AGUMENTATION OF GROUND WATER BASED SRIDHARPUR PWSS TO ACCOMMODATE FHTC IN MEMARI-II BLOCK UNDER BURDWAN SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/09488 Augmentation Supply of materials for different water supply scheme under Burdwan Division, PHE Dte. VCH/001578/2021-2022 1207/DW 10/03/2022 EXECUTIVE ENGINEER, RESOURCES DIVISION, P.H.E. DTE. 3,005.00 0.00 0 0
1010 PURBA BARDHAMAN Burdwan Division AGUMENTATION OF GROUND WATER BASED SRIDHARPUR PWSS TO ACCOMMODATE FHTC IN MEMARI-II BLOCK UNDER BURDWAN SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/09488 Augmentation Route Survey & Preparation of DPR for Sridharpur W/S Scheme under Memari-II Block under Burdwan Sub-Division under Burdwan Division PHE Dte. Sl No.6. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000494/2021-2022 181/BSD 31/01/2022 30 RADIANT 2.59 2.59 100 1
1011 PURBA BARDHAMAN Burdwan Division AGUMENTATION OF GROUND WATER BASED SRIDHARPUR PWSS TO ACCOMMODATE FHTC IN MEMARI-II BLOCK UNDER BURDWAN SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/09488 Augmentation Augmentation of SRIDHARPUR Piped Water Supply Scheme with LDS, FHTC, Rising Main with necessary interconnection, Construction of 200 Cum capacity OHR with 20.0 Mtr. Staging height inclusive of soil investigation under Memari II Block, District Purba Bardhaman. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000007/2022-2023 1937/BWD 11/04/2022 360 SUJAY KUMAR RAY 251.30 178.78 71.14 60
1012 PURBA BARDHAMAN Burdwan Division AGUMENTATION OF GROUND WATER BASED SRIDHARPUR PWSS TO ACCOMMODATE FHTC IN MEMARI-II BLOCK UNDER BURDWAN SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/09488 Augmentation Repairing of RCC Elevated Reservoir (Capacity 140 Cum) of SRIDHARPUR Piped Water Supply Scheme under Burdwan Sub-Division within Burdwan Division P.H.E. Dte. ORD/000608/2023-2024 3812/BWD 01/09/2023 30 SUJAY KUMAR RAY 7.41 0.00 0 0
1013 PURBA BARDHAMAN Burdwan Division AGUMENTATION OF GROUND WATER BASED SRIDHARPUR PWSS TO ACCOMMODATE FHTC IN MEMARI-II BLOCK UNDER BURDWAN SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/09488 Augmentation Material Requisition To Resource Division RTOR000062/2021-2022 562/BWD 27/01/2022 Resource Division 11.00 0.00 0 0
1014 PURBA BARDHAMAN Burdwan Division AGUMENTATION OF GROUND WATER BASED SRIDHARPUR PWSS TO ACCOMMODATE FHTC IN MEMARI-II BLOCK UNDER BURDWAN SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/09488 Augmentation Material Requisition To Resource Division RTOR000110/2021-2022 1069/BWD 24/02/2022 Resource Division 37.52 0.00 0 0
1015 PURBA BARDHAMAN Burdwan Division AGUMENTATION OF GROUND WATER BASED SRIDHARPUR PWSS TO ACCOMMODATE FHTC IN MEMARI-II BLOCK UNDER BURDWAN SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/09488 Augmentation Material Requisition To Resource Division RTOR000197/2021-2022 1520/BWD 15/03/2022 Resource Division 0.37 0.00 0 0
1016 PURBA BARDHAMAN Burdwan Division AGUMENTATION OF GROUND WATER BASED SRIDHARPUR PWSS TO ACCOMMODATE FHTC IN MEMARI-II BLOCK UNDER BURDWAN SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/09488 Augmentation Replacement of Tube-well & Rising main at HEAD TW site for Aug. of PARHATI, SRIDHARPUR, SATGACHIA ZONE-I, SATGACHIA ZONE-II, Piped Water Supply Scheme within MEMARI-II Block under Burdwan Divn., PHE. Dte. District:- Purba-Bardhaman. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000973/2023-2024 24/BWD 03/01/2024 60 SUSUNIA GP CO. OPERATIVE LABOUR CONTRACT AND CONSTRUCTION SOCIETY LTD. 54.20 0.00 0 90
1017 PURBA BARDHAMAN Burdwan Division Rejuvenation of Bhalki Water Supply Scheme. , SM/09103 Augmentation Restoration of Pipeline by Re-Laying of Pipe Line for Rejuvenation of BHALKI and its adjoining mouza's Piped W/S Scheme at Ausgram-II Block under Burdwan Division, P.H.E. Dte. Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000104/2021-2022 3877/BWD 27/07/2021 60 ASHOK KUMAR GHOSH 279.81 220.32 78.74 1
1018 PURBA BARDHAMAN Burdwan Division Rejuvenation of Bhalki Water Supply Scheme. , SM/09103 Augmentation Construction of Drain and restoration of connection for Augmentation of BHALKI W/S Scheme , Block- Ausgram-II, under Durgapur (Burdwan North)Sub Division Burdwan Division, P.H.E. Dte. [SL-B] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000121/2022-2023 334/DSD 27/06/2022 30 TAUSIF HOSSAIN MONDAL 1.88 1.87 99.47 1
1019 PURBA BARDHAMAN Burdwan Division Rejuvenation of Bhalki Water Supply Scheme. , SM/09103 Augmentation Making structure with GI pipe for provision of joining and laying of pipeline near Abhirampur branch Canal for Bhalki and its adjoining mouza's Piped W/S Scheme at Ausgram-II Block within Durgapur Sub Division under Burdwan Division, P.H.E. Dte. [Gr.-H] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000134/2022-2023 349/DSD 30/06/2022 45 PARTHA RAY 1.90 1.82 95.79 1
1020 PURBA BARDHAMAN Burdwan Division Rejuvenation of Bhalki Water Supply Scheme. , SM/09103 Augmentation Providing Functional Household Tap Connection (FHTC) from existing distribution system with within the command area of augmentation BHALKI Piped Water Supply Scheme at Bhalki (Part), Chandipur (Part), Samantapara (Part), Telota (Part) & Abhirampuri (Part) village, habitation, Ausgram-II Block within Durgapur (Burdwan North) Sub Division under Burdwan Division, P.H.E. Dte. Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000006/2022-2023 1907/BWD 07/04/2022 30 ROY CONSTRUCTION 49.52 0.00 0 1
1021 PURBA BARDHAMAN Burdwan Division Augmentation of Ground Water based Piped Water Supply Scheme for BONNABAGRAM to accommodate FHTC under Jal Sapno Mission under Ausgram-I Block in Purba Bardhaman District under Burdwan Division, P.H.E. DTE. , SM/09714 Augmentation Supply of materials for different water supply scheme under Burdwan Division, PHE Dte. VCH/001578/2021-2022 1207/DW 10/03/2022 EXECUTIVE ENGINEER, RESOURCES DIVISION, P.H.E. DTE. 3,005.00 0.00 0 0
1022 PURBA BARDHAMAN Burdwan Division Augmentation of Ground Water based Piped Water Supply Scheme for BONNABAGRAM to accommodate FHTC under Jal Sapno Mission under Ausgram-I Block in Purba Bardhaman District under Burdwan Division, P.H.E. DTE. , SM/09714 Augmentation Route Survey & Preparation of DPR for BANNABAGRAM PWSS under Durgapur(Bardhaman North) Sub-Division under Burdwan Division PHE Dte.[SL-C] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000654/2021-2022 101/DSD 18/02/2022 15 SIRCON ENGINEERING SERVICES 3.09 3.09 100 1
1023 PURBA BARDHAMAN Burdwan Division Augmentation of Ground Water based Piped Water Supply Scheme for BONNABAGRAM to accommodate FHTC under Jal Sapno Mission under Ausgram-I Block in Purba Bardhaman District under Burdwan Division, P.H.E. DTE. , SM/09714 Augmentation Sinking of additional 300 X 200mm dia Tube Well 200 mtr. Depth by D.R. Rig method using UPVC pipe (CD) and UPVC Deep Well Screen (RDS) for Augmentation of BANANABAGRAM Piped Water Supply Scheme, Block - Ausgram - II, Dist - Purba Bardhaman under Burdwan Division, PHE Dte. [2 Nos. GTW]_3RD CALL Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000208/2022-2023 3297/BWD 29/07/2022 45 ANIRUDDHA FARUQUE 27.54 3.64 13.22 1
1024 PURBA BARDHAMAN Burdwan Division Augmentation of Ground Water based Piped Water Supply Scheme for BONNABAGRAM to accommodate FHTC under Jal Sapno Mission under Ausgram-I Block in Purba Bardhaman District under Burdwan Division, P.H.E. DTE. , SM/09714 Augmentation Shifting of UPVC Pipeline due to construction of culvert along PWD Road near Bannabagram Hospital of Bannabagram Piped Water Supply Scheme under Ausgram-I Block within Durgapur (Burdwan North) Sub Division under Burdwan Division, P.H.E. Dte. [Gr.-G] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000463/2021-2022 79/DSD 11/02/2022 30 M/S UNIQUE 2.13 0.00 0 1
1025 PURBA BARDHAMAN Burdwan Division Augmentation of Ground Water based Piped Water Supply Scheme for BONNABAGRAM to accommodate FHTC under Jal Sapno Mission under Ausgram-I Block in Purba Bardhaman District under Burdwan Division, P.H.E. DTE. , SM/09714 Augmentation Laying of pipeline for road crossing due to construction of culvert along PWD Road near Bannabagram Hospital of Bannabagram Piped Water Supply Scheme under Ausgram-I Block within Durgapur (Burdwan North) Sub Division under Burdwan Division, P.H.E. Dte. [Gr,-D] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000133/2022-2023 345/DSD 30/06/2022 30 DUBE ENTERPRISE 1.07 1.07 100 1
1026 PURBA BARDHAMAN Central Mechanical Augmentation of Ground Water based Piped Water Supply Scheme for BONNABAGRAM to accommodate FHTC under Jal Sapno Mission under Ausgram-I Block in Purba Bardhaman District under Burdwan Division, P.H.E. DTE. , SM/09714 Augmentation Supply & Installation of Submersible Pumping Machinery , Voltage Stabilizer, Chlorination system and internal House wiring for Tube well no.- 1 at Augumentation of Bononabagram Water Supply Scheme under CMD, PHE Dte., Dist.- Purba-Bardhaman. ORD/000075/2023-2024 2561/CMD 06/06/2023 30 SOUVIK HALDER 10.98 0.00 0 0
1027 PURBA BARDHAMAN Burdwan Division Augmentation of Ground Water based Piped Water Supply Scheme for BONNABAGRAM to accommodate FHTC under Jal Sapno Mission under Ausgram-I Block in Purba Bardhaman District under Burdwan Division, P.H.E. DTE. , SM/09714 Augmentation Material Requisition To Resource Division RTOR000029/2021-2022 550/BWD 27/01/2022 Resource Division 13.66 0.00 0 0
1028 PURBA BARDHAMAN Burdwan Division Augmentation of Ground Water based Piped Water Supply Scheme for BONNABAGRAM to accommodate FHTC under Jal Sapno Mission under Ausgram-I Block in Purba Bardhaman District under Burdwan Division, P.H.E. DTE. , SM/09714 Augmentation Material Requisition To Resource Division RTOR000191/2021-2022 1373/BWD 09/03/2022 Resource Division 3.83 0.00 0 0
1029 PURBA BARDHAMAN Burdwan Division Augmentation of Ground Water based Piped Water Supply Scheme for BONNABAGRAM to accommodate FHTC under Jal Sapno Mission under Ausgram-I Block in Purba Bardhaman District under Burdwan Division, P.H.E. DTE. , SM/09714 Augmentation Material Requisition To Resource Division RTOR000238/2021-2022 1562/BWD 15/03/2022 Resource Division 0.37 0.00 0 0
1030 PURBA BARDHAMAN Burdwan Division Augmentation of Ground Water based Piped Water Supply Scheme for BONNABAGRAM to accommodate FHTC under Jal Sapno Mission under Ausgram-I Block in Purba Bardhaman District under Burdwan Division, P.H.E. DTE. , SM/09714 Augmentation Material Requisition To Resource Division RTOR000144/2021-2022 1203/BWD 04/03/2022 Resource Division 22.68 0.00 0 0
1031 PURBA BARDHAMAN Burdwan Division Augmentation of Ground Water based Piped Water Supply Scheme for BONNABAGRAM to accommodate FHTC under Jal Sapno Mission under Ausgram-I Block in Purba Bardhaman District under Burdwan Division, P.H.E. DTE. , SM/09714 Augmentation Material Requisition To Resource Division RTOR000170/2021-2022 1330/BWD 08/03/2022 Resource Division 39.95 0.00 0 0
1032 PURBA BARDHAMAN Burdwan Division Augmentation of Ground Water based Piped Water Supply Scheme for BONNABAGRAM to accommodate FHTC under Jal Sapno Mission under Ausgram-I Block in Purba Bardhaman District under Burdwan Division, P.H.E. DTE. , SM/09714 Augmentation Material Requisition To Resource Division RTOR000036/2022-2023 4628/BWD 17/10/2022 Resource Division 12.32 0.00 0 0
1033 PURBA BARDHAMAN Burdwan Division Augmentation of Ground Water based Piped Water Supply Scheme for BONNABAGRAM to accommodate FHTC under Jal Sapno Mission under Ausgram-I Block in Purba Bardhaman District under Burdwan Division, P.H.E. DTE. , SM/09714 Augmentation Augmentation of BANNABAGRAM Piped Water Supply Scheme with LDS, FHTC, Rising main, Construction of 400 cum capacity OHR with 20.0 mtr. Staging height inclusive of soil investigation including construction of switch room without sanitary arrangements Block-Ausgram-I, District:- Purba-Burdwan. Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000074/2022-2023 2497/BWD 13/05/2022 1051 GHOSH CONCERN 454.28 292.17 64.31 70
1034 PURBA BARDHAMAN Burdwan Division Augmentation of Ground Water based Piped Water Supply Scheme for BONNABAGRAM to accommodate FHTC under Jal Sapno Mission under Ausgram-I Block in Purba Bardhaman District under Burdwan Division, P.H.E. DTE. , SM/09714 Augmentation Left out part of Laying Distribution system for Augmentation of BANNABAGRAM and its adjoining mouza's Piped W/S Scheme at Ausgram-I Block under Burdwan Division, P.H.E. Dte. Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000686/2023-2024 4283/BWD 29/09/2023 94 GHOSH CONCERN 93.70 0.00 0 100
1035 PURBA BARDHAMAN Durgapur W/S Division Augmentation of Ground Water based Piped Water Supply Scheme for BONNABAGRAM to accommodate FHTC under Jal Sapno Mission under Ausgram-I Block in Purba Bardhaman District under Burdwan Division, P.H.E. DTE. , SM/09714 Augmentation Material Requisition To Resource Division RTOR000050/2024-2025 470/DWSD 17/03/2025 Resource Division 0.14 0.00 0 0
1036 PURBA BARDHAMAN Burdwan Division DETAILED PROJECT REPORT FOR AUGMENTATION F GROUND WATER BASED KUSUMGRAM (ZONE I AND ZONE II) PWSS TO ACCOMMODATE FHTC IN MANTESWAR BLOCK UNDER KALNA SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/10058 Augmentation Supply of materials for different water supply scheme under Burdwan Division, PHE Dte. VCH/001578/2021-2022 1207/DW 10/03/2022 EXECUTIVE ENGINEER, RESOURCES DIVISION, P.H.E. DTE. 3,005.00 0.00 0 0
1037 PURBA BARDHAMAN Burdwan Division DETAILED PROJECT REPORT FOR AUGMENTATION F GROUND WATER BASED KUSUMGRAM (ZONE I AND ZONE II) PWSS TO ACCOMMODATE FHTC IN MANTESWAR BLOCK UNDER KALNA SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/10058 Augmentation Preparation of DPR for augmentation of Kusumgram W/S Scheme (Zone-I & II) within Kalna Sub-Division under Burdwan Division, PHE Dte. (Sl No-B) Assistant Engineer ORD/000569/2021-2022 204/KSD 23/02/2022 21 ROY CHOWDHURY ASSOCIATES 3.93 3.91 99.49 1
1038 PURBA BARDHAMAN Burdwan Division DETAILED PROJECT REPORT FOR AUGMENTATION F GROUND WATER BASED KUSUMGRAM (ZONE I AND ZONE II) PWSS TO ACCOMMODATE FHTC IN MANTESWAR BLOCK UNDER KALNA SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/10058 Augmentation Material Requisition To Resource Division RTOR000056/2022-2023 5521/BWD 23/12/2022 Resource Division 32.81 0.00 0 0
1039 PURBA BARDHAMAN Central Mechanical DETAILED PROJECT REPORT FOR AUGMENTATION F GROUND WATER BASED KUSUMGRAM (ZONE I AND ZONE II) PWSS TO ACCOMMODATE FHTC IN MANTESWAR BLOCK UNDER KALNA SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/10058 Augmentation Supply , delivery & Installation of Submersible Pumping Machinery , Voltage stabiliser , Chlorinator and Internal House wiring for Tube well No. 3 of Kulut [ Kusumgram ] Water Supply Scheme under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER ORD/000010/2022-2023 1172/CMD 27/06/2022 30 M/S. DAS ELECTRIC CO. 9.33 8.93 95.71 1
1040 PURBA BARDHAMAN Burdwan Division DETAILED PROJECT REPORT FOR AUGMENTATION F GROUND WATER BASED KUSUMGRAM (ZONE I AND ZONE II) PWSS TO ACCOMMODATE FHTC IN MANTESWAR BLOCK UNDER KALNA SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/10058 Augmentation Sinking of 250 X 150mm dia Tube Well 150 mtr. Depth by D.R. Rig method using UPVC pipe (CM) and UPVC Medium Well Screen (RMS) for 1ST TW Site of Aug. of KUSUMGRAM (Z-II) & its adjoining mouzas Piped Water Supply Scheme, Block ? Monteswar, Dist - Purba Bardhaman under Burdwan Division, PHE Dte. _2ND CALL. Assistant Engineer ORD/000657/2022-2023 371/BWD 31/01/2023 30 SUSUNIA GP CO. OPERATIVE LABOUR CONTRACT AND CONSTRUCTION SOCIETY LTD. 7.33 6.84 93.32 1
1041 PURBA BARDHAMAN Burdwan Division DETAILED PROJECT REPORT FOR AUGMENTATION F GROUND WATER BASED KUSUMGRAM (ZONE I AND ZONE II) PWSS TO ACCOMMODATE FHTC IN MANTESWAR BLOCK UNDER KALNA SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/10058 Augmentation Material Requisition To Resource Division RTOR000224/2021-2022 1547/BWD 15/03/2022 Resource Division 0.37 0.00 0 0
1042 PURBA BARDHAMAN Central Mechanical DETAILED PROJECT REPORT FOR AUGMENTATION F GROUND WATER BASED KUSUMGRAM (ZONE I AND ZONE II) PWSS TO ACCOMMODATE FHTC IN MANTESWAR BLOCK UNDER KALNA SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/10058 Augmentation Installation of Electro-mechanical accessories at Kusungram zone-1 PH-2 (replacement T.W) Water Supply Scheme under CMD, PHE Dte., Dist.- Purba-Bardhaman ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000994/2023-2024 4361/CMD 21/09/2023 30 BENGAL ELECTRICAL CONSTRUCTION 1.97 0.98 49.75 100
1043 PURBA BARDHAMAN Burdwan Division DETAILED PROJECT REPORT FOR AUGMENTATION F GROUND WATER BASED KUSUMGRAM (ZONE I AND ZONE II) PWSS TO ACCOMMODATE FHTC IN MANTESWAR BLOCK UNDER KALNA SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/10058 Augmentation Sinking of Tube Well and laying of rising main and additional work of KUSUMGRAM Piped water supply scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. (P.P. Site- Kulut for for Safarda, Akbarnagar) Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000863/2023-2024 5205/BWD 29/11/2023 120 MANASH GHOSH 117.96 0.00 0 15
1044 PURBA BARDHAMAN Burdwan Division DETAILED PROJECT REPORT FOR AUGMENTATION F GROUND WATER BASED KUSUMGRAM (ZONE I AND ZONE II) PWSS TO ACCOMMODATE FHTC IN MANTESWAR BLOCK UNDER KALNA SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/10058 Augmentation Augmentation of Kusumgram Zone-I & II Piped Water Supply Scheme with LDS, FHTC, Rising main, Construction of 450 & 300 cum capacity OHR with 20.0 mtr. Staging height including construction of switch-room without sanitary & water supply arrangement, boundary wall including repairing of boundary wall under Monteswar Block, District:- Purba-Bardhaman. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000541/2022-2023 5079/BWD 17/11/2022 420 MANASH GHOSH 778.07 655.79 84.28 66
1045 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED SASINARA ZONE I PWSS TO ACCOMMODATE FHTC IN MEMARI-I BLOCK UNDER BURDWAN SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/10057 Augmentation Route Survey & Preparation of DPR for Sasinara (Zone-I) W/S Scheme under Memari-I Block under Burdwan Sub-Division under Burdwan Division PHE Dte. Sl No.3 Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000511/2021-2022 178/BSD 31/01/2022 30 APEX ENGINEERING 3.01 3.00 99.67 1
1046 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED SASINARA ZONE I PWSS TO ACCOMMODATE FHTC IN MEMARI-I BLOCK UNDER BURDWAN SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/10057 Augmentation Supply of materials for different water supply scheme under Burdwan Division, PHE Dte. VCH/001578/2021-2022 1207/DW 10/03/2022 EXECUTIVE ENGINEER, RESOURCES DIVISION, P.H.E. DTE. 3,005.00 0.00 0 0
1047 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED SASINARA ZONE I PWSS TO ACCOMMODATE FHTC IN MEMARI-I BLOCK UNDER BURDWAN SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/10057 Augmentation Material Requisition To Resource Division RTOR000154/2021-2022 1246/BWD 07/03/2022 Resource Division 4.36 0.00 0 0
1048 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED SASINARA ZONE I PWSS TO ACCOMMODATE FHTC IN MEMARI-I BLOCK UNDER BURDWAN SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/10057 Augmentation Material Requisition To Resource Division RTOR000226/2021-2022 1554/BWD 15/03/2022 Resource Division 0.37 0.00 0 0
1049 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED SASINARA ZONE I PWSS TO ACCOMMODATE FHTC IN MEMARI-I BLOCK UNDER BURDWAN SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/10057 Augmentation Material Requisition To Resource Division RTOR000174/2021-2022 1333/BWD 08/03/2022 Resource Division 51.36 0.00 0 0
1050 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED SASINARA ZONE I PWSS TO ACCOMMODATE FHTC IN MEMARI-I BLOCK UNDER BURDWAN SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/10057 Augmentation Material Requisition To Resource Division RTOR000043/2022-2023 4853/BWD 20/10/2022 Resource Division 13.55 0.00 0 0
1051 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED SASINARA ZONE I PWSS TO ACCOMMODATE FHTC IN MEMARI-I BLOCK UNDER BURDWAN SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/10057 Augmentation Restoration of Pump House at Head Work site of SASINARA ZONE-I Piped water supply scheme at Memari-I Block under Burdwan Division, Dist.-Purba Bardhaman. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000182/2024-2025 1004/BSD 06/06/2024 30 MS MOLLA CONSTRUCTION 0.96 0.00 0 0
1052 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED SASINARA ZONE I PWSS TO ACCOMMODATE FHTC IN MEMARI-I BLOCK UNDER BURDWAN SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/10057 Augmentation Replacement of Tube-well & Rising main at HEAD TW SITE for Aug. of BAGILA, SASINARA ZONE-I, SASINARA ZONE-II, Piped Water Supply Scheme within MEMARI-I Block under Burdwan Division, PHE. Dte. District:- Purba-Bardhaman. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000974/2023-2024 027/BWD 03/01/2024 60 KOUSIK MALLICK 38.87 0.00 0 90
1053 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED SASINARA ZONE I PWSS TO ACCOMMODATE FHTC IN MEMARI-I BLOCK UNDER BURDWAN SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/10057 Augmentation Sinking of 300 X 200mm dia Tube Well 150 mtr. Depth by D.R. Rig method using UPVC pipe (CD) and UPVC Deep Well Screen (RDS) for SASINARA Z-I W/S Scheme at DEBIPUR Mouza under Memari-I Block and SATGACHIA Z-I W/S Scheme at BEGUNIA Mouza under Memari-II Block within Burdwan Sub-Division, PHE Dte. [For 02 Nos. Tube well]. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000192/2023-2024 2687/BWD 08/06/2023 60 ANIRUDDHA FARUQUE 26.48 6.04 22.81 50
1054 PURBA BARDHAMAN Central Mechanical AUGMENTATION OF GROUND WATER BASED SASINARA ZONE I PWSS TO ACCOMMODATE FHTC IN MEMARI-I BLOCK UNDER BURDWAN SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/10057 Augmentation Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Zone- 1 & 2, Tube well No.-3 at Augumentation of SASINARA Water Supply Scheme [BLOCK- MEMARI-I] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER Junior Engineer ORD/000035/2024-2025 2138/CMD 05/07/2024 60 C.M. ENTERPRISE 24.63 0.00 0 45
1055 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED SASINARA ZONE I PWSS TO ACCOMMODATE FHTC IN MEMARI-I BLOCK UNDER BURDWAN SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/10057 Augmentation Providing Balance Functional Household Tap Connection (1057 Nos FHTC) from existing distribution system within the command area of SASINARA ZONE-I Piped Water Supply Scheme at (Chhotodhama, Debipur, Dharmasimla, Purnagram, Jotchaitanya, Chaupira, Gouripur, Poltara) Mouza, Construction of boundary wall at head work site, 2nd T/W & 3rd T/W site under MEMARI-I Block of Burdwan Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000158/2024-2025 2176/BWD 12/06/2024 120 AMIT KUMAR ROY 71.85 7.59 10.56 30
1056 PURBA BARDHAMAN Central Mechanical AUGMENTATION OF GROUND WATER BASED SASINARA ZONE I PWSS TO ACCOMMODATE FHTC IN MEMARI-I BLOCK UNDER BURDWAN SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/10057 Augmentation Quotation for new service connection at Sasinara W/S (Aug) Z-1, TW-3. BILL/00931/2024-2025 BP-2024-25-350 05/10/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 7.88 0.00 0 0
1057 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED SASINARA ZONE I PWSS TO ACCOMMODATE FHTC IN MEMARI-I BLOCK UNDER BURDWAN SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/10057 Augmentation Construction of boundary wall at 1st Tube well site for SASINARA ZONE- III PWSS under MEMARI - I Block, District:- Purba-Bardhaman. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000709/2024-2025 3706/BWD 28/10/2024 90 S.M. ENTERPRISE 10.59 0.00 0 0
1058 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED SASINARA ZONE I PWSS TO ACCOMMODATE FHTC IN MEMARI-I BLOCK UNDER BURDWAN SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/10057 Augmentation Augmentation of SASINARA ZONE-I Piped Water Supply Scheme with LDS, FHTC, Rising main & Construction of 400 cum capacity OHR with 20.0 mtr. Staging height inclusive of soil investigation under Memari-I Block, District:- Purba-Burdwan. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000127/2022-2023 2971/BWD 30/06/2022 365 MRITYUNJOY MUKHERJEE & CO. 658.71 416.89 63.29 70
1059 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED SASINARA ZONE I PWSS TO ACCOMMODATE FHTC IN MEMARI-I BLOCK UNDER BURDWAN SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/10057 Augmentation Construction of switch rooms & Rising main at different TW site for SASINARA (Zone-I) Piped Water Supply Scheme under Memari - I Block, District:- Purba-Bardhaman under Burdwan Division, PHE. Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000577/2023-2024 3725/BWD 25/08/2023 615 MOTIONMASS TECHNO (OPC) PRIVATE LIMITED 9.03 0.00 0 90
1060 PURBA BARDHAMAN Burdwan Division Providing Water Supply Arrangement by Sinking of Tube Well at left out Primary Schools(292 nos) for 100% School Coverage in Purba Bardhaman within Burdwan North Sub Division under Burdwan Division P.H.E. DTE. , SM/11284 School Sinking of 100mtr. deep 100 × 40mm tubewell for providing water supply arrangement in Schools under Galsi I Block (42 Nos School) within Purba Bardhaman District under Burdwan Division, PHE Dte. (Part-A). Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000299/2022-2023 3663/BWD 29/08/2022 45 SAIKAT RAY 47.35 0.00 0 0
1061 PURBA BARDHAMAN Burdwan Division Providing Water Supply Arrangement by Sinking of Tube Well at left out Primary Schools(292 nos) for 100% School Coverage in Purba Bardhaman within Burdwan North Sub Division under Burdwan Division P.H.E. DTE. , SM/11284 School Material Requisition To Resource Division RTOR000050/2022-2023 5397/BWD 12/12/2022 Resource Division 85.00 0.00 0 0
1062 PURBA BARDHAMAN Burdwan Division Providing Water Supply Arrangement by Sinking of Tube Well at left out Primary Schools(292 nos) for 100% School Coverage in Purba Bardhaman within Burdwan North Sub Division under Burdwan Division P.H.E. DTE. , SM/11284 School Sinking of 100mtr. deep 100 × 40mm tubewell for providing water supply arrangement in Schools under Galsi ? II Block (40 Nos School) within Purba Bardhaman District under Burdwan Division, PHE Dte. (Part-B). Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000298/2022-2023 3608/BWD 18/08/2022 45 GENUINE ENGINEERING CO-OP. SOCIETY LTD. 45.08 36.13 80.15 0
1063 PURBA BARDHAMAN Burdwan Division Providing Water Supply Arrangement by Sinking of Tube Well at left out Primary Schools(292 nos) for 100% School Coverage in Purba Bardhaman within Burdwan North Sub Division under Burdwan Division P.H.E. DTE. , SM/11284 School Sinking of 100mtr. deep 100 × 40mm tubewell for providing water supply arrangement in Schools under Ausgram ? I Block (27 Nos School) within Purba Bardhaman District under Burdwan Division, PHE Dte. Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000290/2022-2023 3596/BWD 17/08/2022 45 SIRAJUL MANDAL 29.87 28.74 96.22 100
1064 PURBA BARDHAMAN Burdwan Division Providing Water Supply Arrangement by Sinking of Tube Well at left out Primary Schools(292 nos) for 100% School Coverage in Purba Bardhaman within Burdwan North Sub Division under Burdwan Division P.H.E. DTE. , SM/11284 School Material Requisition To Resource Division RTOR000022/2022-2023 3299/BWD 29/07/2022 Resource Division 80.44 0.00 0 0
1065 PURBA BARDHAMAN Burdwan Division Providing Water Supply Arrangement by Sinking of Tube Well at left out Primary Schools(292 nos) for 100% School Coverage in Purba Bardhaman within Burdwan North Sub Division under Burdwan Division P.H.E. DTE. , SM/11284 School Sinking of 100mtr. deep 100 × 40mm tubewell for providing water supply arrangement in Schools under Ausgram ? II Block (31 Nos School) within Purba Bardhaman District under Burdwan Division, PHE Dte. (Part-A). Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000344/2022-2023 3691/BWD 29/08/2022 45 BASUNDHARA SOLUTION 34.60 24.57 71.01 100
1066 PURBA BARDHAMAN Burdwan Division Providing Water Supply Arrangement by Sinking of Tube Well at left out Primary Schools(292 nos) for 100% School Coverage in Purba Bardhaman within Burdwan North Sub Division under Burdwan Division P.H.E. DTE. , SM/11284 School Sinking of 100mtr. deep 100 × 40mm tubewell for providing water supply arrangement in Schools under Bhatar Block (40 Nos School) within Purba Bardhaman District under Burdwan Division, PHE Dte. Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000194/2022-2023 3417/BWD 05/08/2022 45 DHIRENDRANATH SOM 45.05 32.84 72.9 100
1067 PURBA BARDHAMAN Burdwan Division Providing Water Supply Arrangement by Sinking of Tube Well at left out Primary Schools(292 nos) for 100% School Coverage in Purba Bardhaman within Burdwan North Sub Division under Burdwan Division P.H.E. DTE. , SM/11284 School Sinking of 100mtr. deep 100 × 40mm tubewell for providing water supply arrangement in Schools under Galsi ¿ I Block (41 Nos School) within Purba Bardhaman District under Burdwan Division, PHE Dte. (Part-B). Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000308/2022-2023 3664/BWD 29/08/2022 45 ASHOK KUMAR GHOSH 46.23 29.07 62.88 100
1068 PURBA BARDHAMAN Burdwan Division Providing Water Supply Arrangement by Sinking of Tube Well at left out Primary Schools(292 nos) for 100% School Coverage in Purba Bardhaman within Burdwan North Sub Division under Burdwan Division P.H.E. DTE. , SM/11284 School Sinking of 90mtr. deep 100 × 50 mm tubewell for providing water supply arrangement in Scoreless School under Bhatar Block (2 Nos School) [i) Chamardighi F.P.School , ii)Gardanmari S.S.K.]) within Purba Bardhaman District under Burdwan Division, PHE Dte. Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/001151/2024-2025 347(a)/DSD 19/04/2024 6 PAPRI HAZRA 2.47 0.00 0 100
1069 PURBA BARDHAMAN Burdwan Division Providing Water Supply Arrangement by Sinking of Tube Well at left out Primary Schools(292 nos) for 100% School Coverage in Purba Bardhaman within Burdwan North Sub Division under Burdwan Division P.H.E. DTE. , SM/11284 School Sinking of 90mtr. deep 100 × 40mm tubewell for providing water supply arrangement in scoreless School under Bhatar Block (2 Nos School [i) Dangsara F.P.School ii) Bhumshore S.S.K.]) within Purba Bardhaman District under Burdwan Division, PHE Dte. Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/001150/2024-2025 347(b)/DSD 19/04/2024 6 BIPLAB SAMANTA 2.47 0.00 0 100
1070 PURBA BARDHAMAN Ausgram - I Burdwan Division Karatia Piped Water Supply Scheme , SM/13397 New Material Requisition To Resource Division RTOR000030/2023-2024 1962/BWD 25/04/2023 Resource Division 4.22 0.00 0 0
1071 PURBA BARDHAMAN Ausgram - I Burdwan Division Karatia Piped Water Supply Scheme , SM/13397 New Material Requisition To Resource Division RTOR000315/2023-2024 2197/BWD 12/05/2023 Resource Division 13.44 0.00 0 0
1072 PURBA BARDHAMAN Ausgram - I Central Mechanical Karatia Piped Water Supply Scheme , SM/13397 New New service connection charges for Karatia PWSS TW-1 BILL/00961/2023-2024 BP-2023-24-117 16/08/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 2.90 0.00 0 0
1073 PURBA BARDHAMAN Ausgram - I Central Mechanical Karatia Piped Water Supply Scheme , SM/13397 New New service connection charges for Karatia PWSS TW-2 BILL/01465/2023-2024 BP-2023-24-161 18/09/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 5.19 0.00 0 0
1074 PURBA BARDHAMAN Ausgram - I Burdwan Division Karatia Piped Water Supply Scheme , SM/13397 New Material Requisition To Resource Division RTOR000633/2023-2024 4875/BWD 10/11/2023 Resource Division 25.70 0.00 0 0
1075 PURBA BARDHAMAN Ausgram - I Central Mechanical Karatia Piped Water Supply Scheme , SM/13397 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at Karatia Water Supply Scheme [ Block- Ausgram-1 ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. Driller In-Charge JUNIOR ENGINEER ORD/000233/2023-2024 3172/CMD 26/07/2023 30 C.M. ENTERPRISE 27.12 10.67 39.34 96
1076 PURBA BARDHAMAN Ausgram - I Burdwan Division Karatia Piped Water Supply Scheme , SM/13397 New Continuation work for supply of 01 (one) No. Diesel driven Motor Cab (Bharat Stage-II) on hire basis for the office of the assistant Engineer, Durgapur Sub-Divison(Burdwan North), P.H.E. DTE.Govt. of West Bengal (for the period of December'2023 to May'2024) Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000971/2023-2024 877/DSD 30/11/2023 183 SUJAUDDIN SEKH 0.87 0.00 0 50
1077 PURBA BARDHAMAN Ausgram - I Burdwan Division Karatia Piped Water Supply Scheme , SM/13397 New KARATIA Piped Water Supply Scheme with sinking of Tube-well, LDS, Rising Main, FHTC, Construction of 350 cum capacity RCC OHR with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drain and internal pathway at different TW site under Ausgram-I Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer1, Durgapur Sub-Division, PHE Dte. ORD/000368/2023-2024 3082/BWD 18/07/2023 365 BANSBERIA CONSTRUCTION CO. 578.76 160.47 27.73 75
1078 PURBA BARDHAMAN Ausgram - I Burdwan Division Karatia Piped Water Supply Scheme , SM/13397 New Continuation work order for supply of 01 (one) No. Diesel driven Motor Cab (Bharat Stage-III) on hire basis for the office of the Assistant Engineer, Durgapur Sub-Divison(Burdwan North), P.H.E. DTE. Govt. of West Bengal (for the period of 01/06/2024 to 31/07/2024) Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer1, Durgapur Sub-Division, PHE Dte. ORD/000184/2024-2025 411/DSD 28/05/2024 61 SUJAUDDIN SEKH 0.80 0.00 0 0
1079 PURBA BARDHAMAN Ausgram - I Central Mechanical Karatia Piped Water Supply Scheme , SM/13397 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Pichkuri, karatia & others water supply scheme under Ausgram-1 Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman Driller In-Charge JUNIOR ENGINEER ORD/000398/2024-2025 2764/CMD 26/09/2024 90 JAL PRAVAHIKA PVT LTD 52.55 0.00 0 0
1080 PURBA BARDHAMAN Ausgram - I Durgapur W/S Division Karatia Piped Water Supply Scheme , SM/13397 New FORMAL WORK ORDER FOR Balance and additional works for sinking of 300X200 mm dia X 210 mtr deapth RRM Tube well and laying pipe line (LDS),FHTC, Construction of Switch Room,Pump House,Inter Connection along with road restoration and construction of Boundary wall for head worksites and other allieds work related to JJM (7 Nos PWSS) i.e. Aushgram PWSS, Jalkandar and Bhuyera PWSS, Karatia PWSS, Khandari PWSS, Pichkuri PWSS, Shibda PWSS under Aushgram-I and II,Galsi-I and II Block under DURGAPUR W/S DIVISION,PHE Dte. Assistant Engineer-I,Assistant Engineer-II Contractual Junior Engineer_1,Contractual Junior Engineer_2,Contractual Junior Engineer_3,Contractual Junior Engineer_4,Contractual Junior Engineer_5,JUNIOR ENGINEER-1,JUNIOR ENGINEER-2,Junior Engineer_3 ORD/000286/2024-2025 493/DWSD 19/03/2025 185 MANASH GHOSH 745.87 0.00 0 0
1081 PURBA BARDHAMAN Ausgram - I Durgapur W/S Division Karatia Piped Water Supply Scheme , SM/13397 New Material Requisition To Resource Division RTOR000060/2024-2025 480/DWSD 17/03/2025 Resource Division 0.14 0.00 0 0
1082 PURBA BARDHAMAN Khandaghosh Burdwan Division GOPALBERA PIPED WATER SUPPLY SCHEME , SM/13905 New Material Requisition To Resource Division RTOR000105/2023-2024 1965/BWD 26/04/2023 Resource Division 9.42 0.00 0 0
1083 PURBA BARDHAMAN Khandaghosh Burdwan Division GOPALBERA PIPED WATER SUPPLY SCHEME , SM/13905 New Material Requisition To Resource Division RTOR000192/2023-2024 2155/BWD 10/05/2023 Resource Division 11.22 0.00 0 0
1084 PURBA BARDHAMAN Khandaghosh Burdwan Division GOPALBERA PIPED WATER SUPPLY SCHEME , SM/13905 New Material Requisition To Resource Division RTOR000715/2023-2024 5269/BWD 30/11/2023 Resource Division 21.07 0.00 0 0
1085 PURBA BARDHAMAN Khandaghosh Central Mechanical GOPALBERA PIPED WATER SUPPLY SCHEME , SM/13905 New New service connection for Gopalbera PWSS TW -2. BILL/02416/2023-2024 BP-2023-24-514 08/02/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 6.28 0.00 0 0
1086 PURBA BARDHAMAN Khandaghosh Central Mechanical GOPALBERA PIPED WATER SUPPLY SCHEME , SM/13905 New New service connection for Gopalbera PWSS TW -1. BILL/02415/2023-2024 BP-2023-24-513 08/02/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 4.42 0.00 0 0
1087 PURBA BARDHAMAN Khandaghosh Central Mechanical GOPALBERA PIPED WATER SUPPLY SCHEME , SM/13905 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at KHEJURHATI & others water supply scheme under Khandoghosh Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman ASSISTANT ENGINEER Junior Engineer ORD/000071/2024-2025 2391/CMD 02/08/2024 90 C.M. ENTERPRISE 45.81 0.00 0 0
1088 PURBA BARDHAMAN Khandaghosh Central Mechanical GOPALBERA PIPED WATER SUPPLY SCHEME , SM/13905 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at Gopalbera Water Supply Scheme [ Block- Khandoghosh ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER Junior Engineer ORD/000732/2023-2024 4042/CMD 29/08/2023 30 ASHIM UDYOG 28.95 0.00 0 95
1089 PURBA BARDHAMAN Khandaghosh Burdwan Division GOPALBERA PIPED WATER SUPPLY SCHEME , SM/13905 New Balance work for providing Functional Household Tap Connection (FHTC) within command area GOPALBERA & CHAGRAM W/S. Scheme of Khandaghosh Block under Burdwan Divn., PHE. Dte. Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer1, Durgapur Sub-Division, PHE Dte. ORD/000959/2024-2025 4438/BWD 18/12/2024 120 DUBE ENTERPRISE 143.33 0.00 0 0
1090 PURBA BARDHAMAN Khandaghosh Burdwan Division GOPALBERA PIPED WATER SUPPLY SCHEME , SM/13905 New GOPALBERA Piped Water Supply Scheme with sinking of Tube-well, LDS, Rising Main, FHTC, Construction of 300 cum capacity RCC OHR with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drain and internal pathway at different TW site under Khandaghosh Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer1, Durgapur Sub-Division, PHE Dte.,Junior Engineer2, Durgapur Sub-Division, PHE Dte. ORD/000081/2023-2024 2079/BWD 04/05/2023 698 KHAN ENTERPRISE 588.35 86.86 14.76 50
1091 PURBA BARDHAMAN Khandaghosh Burdwan Division GOPALBERA PIPED WATER SUPPLY SCHEME , SM/13905 New Material Requisition To Resource Division RTOR000063/2024-2025 389/BWD 17/01/2025 Resource Division 1.99 0.00 0 0
1092 PURBA BARDHAMAN Manteswar Burdwan Division GROUND WATER SUPPLY BASED PIPED WATER SUPPLY SCHEME FOR PIPLON PWSS IN MANTESHWAR BLOCK OF PURBA BURDWAN DISTRICT UNDER BURDWAN DIVISION, P.H.E. DTE. , SM/13283 New Material Requisition To Resource Division RTOR000370/2023-2024 2197/BWD 12/05/2023 Resource Division 6.18 0.00 0 0
1093 PURBA BARDHAMAN Manteswar Burdwan Division GROUND WATER SUPPLY BASED PIPED WATER SUPPLY SCHEME FOR PIPLON PWSS IN MANTESHWAR BLOCK OF PURBA BURDWAN DISTRICT UNDER BURDWAN DIVISION, P.H.E. DTE. , SM/13283 New Material Requisition To Resource Division RTOR000543/2023-2024 4310/BWD 29/09/2023 Resource Division 85.20 0.00 0 0
1094 PURBA BARDHAMAN Manteswar Central Mechanical GROUND WATER SUPPLY BASED PIPED WATER SUPPLY SCHEME FOR PIPLON PWSS IN MANTESHWAR BLOCK OF PURBA BURDWAN DISTRICT UNDER BURDWAN DIVISION, P.H.E. DTE. , SM/13283 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1, 2 & 3 at PIPLON Water Supply Scheme [ Block- MONTESWAR ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000793/2023-2024 4081/CMD 29/08/2023 30 SUNRISE ENGINEERING CORPORATION 44.42 0.00 0 0
1095 PURBA BARDHAMAN Manteswar Central Mechanical GROUND WATER SUPPLY BASED PIPED WATER SUPPLY SCHEME FOR PIPLON PWSS IN MANTESHWAR BLOCK OF PURBA BURDWAN DISTRICT UNDER BURDWAN DIVISION, P.H.E. DTE. , SM/13283 New NEW SERVICE CONNECTION FOR PIPLON PWSS. BILL/02688/2023-2024 BP-2023-24-563 23/02/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 7.15 0.00 0 0
1096 PURBA BARDHAMAN Manteswar Central Mechanical GROUND WATER SUPPLY BASED PIPED WATER SUPPLY SCHEME FOR PIPLON PWSS IN MANTESHWAR BLOCK OF PURBA BURDWAN DISTRICT UNDER BURDWAN DIVISION, P.H.E. DTE. , SM/13283 New NEW SERVICE CONNECTION FOR PIPLON PWSS TW -3. BILL/03100/2023-2024 BP-2023-24-640 15/03/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 4.25 0.00 0 0
1097 PURBA BARDHAMAN Manteswar Central Mechanical GROUND WATER SUPPLY BASED PIPED WATER SUPPLY SCHEME FOR PIPLON PWSS IN MANTESHWAR BLOCK OF PURBA BURDWAN DISTRICT UNDER BURDWAN DIVISION, P.H.E. DTE. , SM/13283 New Quotation for new service connection for Piplon PWSS PH-2. BILL/00283/2024-2025 BP-2024-25-143 11/06/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 5.73 0.00 0 0
1098 PURBA BARDHAMAN Manteswar Burdwan Division GROUND WATER SUPPLY BASED PIPED WATER SUPPLY SCHEME FOR PIPLON PWSS IN MANTESHWAR BLOCK OF PURBA BURDWAN DISTRICT UNDER BURDWAN DIVISION, P.H.E. DTE. , SM/13283 New Different works related (sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of different capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site) to BELENDA, JAMNA, PIPLON & PARGUNA Piped Water Supply Scheme under Manteswar Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer1, Durgapur Sub-Division, PHE Dte. ORD/000689/2023-2024 4388/BWD 05/10/2023 667 AKASH CONSTRUCTION 2,296.40 0.00 0 50
1099 PURBA BARDHAMAN Manteswar Central Mechanical GROUND WATER SUPPLY BASED PIPED WATER SUPPLY SCHEME FOR PIPLON PWSS IN MANTESHWAR BLOCK OF PURBA BURDWAN DISTRICT UNDER BURDWAN DIVISION, P.H.E. DTE. , SM/13283 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Sutra & others water supply scheme under Monteswar Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000068/2024-2025 2396/CMD 02/08/2024 455 SINHA ELECTRICALS 78.06 0.00 0 20
1100 PURBA BARDHAMAN Burdwan - I Burdwan Division KALIGRAM PIPED WATER SUPPLY SCHEME , SM/13940 New Material Requisition To Resource Division RTOR000096/2023-2024 1962/BWD 25/04/2023 Resource Division 1.64 0.00 0 0
1101 PURBA BARDHAMAN Burdwan - I Burdwan Division KALIGRAM PIPED WATER SUPPLY SCHEME , SM/13940 New Material Requisition To Resource Division RTOR000300/2023-2024 2197/BWD 12/05/2023 Resource Division 18.63 0.00 0 0
1102 PURBA BARDHAMAN Burdwan - I Central Mechanical KALIGRAM PIPED WATER SUPPLY SCHEME , SM/13940 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at Kaligram Water Supply Scheme [ Block- Burdwan-1 ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER Junior Engineer ORD/000655/2023-2024 3998/CMD 29/08/2023 30 MITRA ENTERPRISE 28.83 0.00 0 0
1103 PURBA BARDHAMAN Burdwan - I Burdwan Division KALIGRAM PIPED WATER SUPPLY SCHEME , SM/13940 New Material Requisition To Resource Division RTOR000719/2023-2024 5272/BWD 30/11/2023 Resource Division 21.07 0.00 0 0
1104 PURBA BARDHAMAN Burdwan - I Central Mechanical KALIGRAM PIPED WATER SUPPLY SCHEME , SM/13940 New New service connection charges for Kaligram PWSS TW-1 BILL/01676/2023-2024 BP-2023-24-225 10/11/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.91 0.00 0 0
1105 PURBA BARDHAMAN Burdwan - I Burdwan Division KALIGRAM PIPED WATER SUPPLY SCHEME , SM/13940 New Different works related (sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of different capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site) to KALIGRAM & PALITPUR Piped Water Supply Scheme under Burdwan I Block, District:- Purba Bardhaman [NEW SCHEME] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000499/2023-2024 3532/BWD 10/08/2023 365 SUPRITI ENTERPRISE 704.50 63.80 9.06 10
1106 PURBA BARDHAMAN Burdwan - I Central Mechanical KALIGRAM PIPED WATER SUPPLY SCHEME , SM/13940 New Quotation for new service connection at KALIGRAM W/S Scheme PH-II. BILL/01815/2023-2024 BP-2023-24-305 30/12/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.57 0.00 0 0
1107 PURBA BARDHAMAN Burdwan - I Central Mechanical KALIGRAM PIPED WATER SUPPLY SCHEME , SM/13940 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at MALKITA & others water supply scheme under Bardhaman-I Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman ASSISTANT ENGINEER Junior Engineer ORD/000066/2024-2025 2388/CMD 02/08/2024 90 ELECTRICAL & MECHANICAL ENGINEERING CORPORATION 55.95 0.00 0 0
1108 PURBA BARDHAMAN Memari - I Burdwan Division MAGRA PIPED WATER SUPPLY SCHEME IN MEMARI-1 BLOCK , SM/13491 New Material Requisition To Resource Division RTOR000070/2022-2023 1251/BWD 17/03/2023 Resource Division 12.34 0.00 0 0
1109 PURBA BARDHAMAN Memari - I Burdwan Division MAGRA PIPED WATER SUPPLY SCHEME IN MEMARI-1 BLOCK , SM/13491 New Material Requisition To Resource Division RTOR000462/2023-2024 3986/BWD 08/09/2023 Resource Division 8.96 0.00 0 0
1110 PURBA BARDHAMAN Memari - I Burdwan Division MAGRA PIPED WATER SUPPLY SCHEME IN MEMARI-1 BLOCK , SM/13491 New Material Requisition To Resource Division RTOR000676/2023-2024 5080/BWD 23/11/2023 Resource Division 20.46 0.00 0 0
1111 PURBA BARDHAMAN Memari - I Burdwan Division MAGRA PIPED WATER SUPPLY SCHEME IN MEMARI-1 BLOCK , SM/13491 New Supply of Inspection Vehicle for inspection of different JJM related (Schemes) works as and when required including supply of driver & fuel (minimum 8 Hours duty per day) and all taxes etc. for Burdwan Sub-Division under Burdwan Division, P.H.E. Dte. consider 96.00 Km. run per day.[Period from 01/08/2023 to 31/10/2023] ORD/000845/2023-2024 1759/BSD 28/07/2023 66 MD HASIN 0.85 0.00 0 0
1112 PURBA BARDHAMAN Memari - I Burdwan Division MAGRA PIPED WATER SUPPLY SCHEME IN MEMARI-1 BLOCK , SM/13491 New Supply & delivery of different dia. MJ Coller for FHTC as well as smooth running of different W/S. Schemes under Burdwan Division, P.H.E. Dte. [i.e. (1) Magra PWSS, Memari-I Block, (2) Kuchut PWSS, Memari - II Block, (3) Khundkuri PWSS, Khandaghosh Block & (4) Samanti PWSS, Burdwan - II Block)] ORD/000653/2023-2024 4076/BWD 13/09/2023 20 SSPR VALVE MANUFACTURING PVT LTD. 20.63 0.00 0 100
1113 PURBA BARDHAMAN Memari - I Central Mechanical MAGRA PIPED WATER SUPPLY SCHEME IN MEMARI-1 BLOCK , SM/13491 New New service connection for Magra W/S Sechem. BILL/02184/2023-2024 BP-2023-24-379 16/01/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 10.10 0.00 0 0
1114 PURBA BARDHAMAN Memari - I Central Mechanical MAGRA PIPED WATER SUPPLY SCHEME IN MEMARI-1 BLOCK , SM/13491 New New Service connection for Magra PWSS TW-2. BILL/02338/2023-2024 BP-2023-24-474 31/01/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.70 0.00 0 0
1115 PURBA BARDHAMAN Memari - I Burdwan Division MAGRA PIPED WATER SUPPLY SCHEME IN MEMARI-1 BLOCK , SM/13491 New Supply of one no. Diesel / LPG / CNG driven Motor Cab / Maxi Cab (Air Condition) on hire basis for the office of the Superintending Engineer, Central Circle, P.H.E. Dte. to be used by the Deputy Superintending Engineer, Central Circle, P.H.E. Dte. [Period from 01.02.2024 to 31.03.2024] AE(HQs) J.E. 1 BURDWAN ORD/001204/2023-2024 42/AE/HQ 29/01/2024 60 MD HASIN 0.80 0.00 0 50
1116 PURBA BARDHAMAN Memari - I Central Mechanical MAGRA PIPED WATER SUPPLY SCHEME IN MEMARI-1 BLOCK , SM/13491 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at SAHAPUR & others water supply scheme under Memari-I Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. ASSISTANT ENGINEER Junior Engineer ORD/000100/2024-2025 2392/CMD 02/08/2024 90 MITRA ENTERPRISE 47.62 0.00 0 0
1117 PURBA BARDHAMAN Memari - I Burdwan Division MAGRA PIPED WATER SUPPLY SCHEME IN MEMARI-1 BLOCK , SM/13491 New Continuation work for Supply of one no. Diesel / LPG / CNG driven Motor Cab / Maxi Cab (Air Condition) on hire basis for the office of the Superintending Engineer, Central Circle, P.H.E. Dte. to be used by the Deputy Superintending Engineer, Central Circle, P.H.E. Dte. [Period from 01.06.2024 to 31.07.2024] AE(HQs) J.E. 1 BURDWAN ORD/000441/2024-2025 307/AE/HQ 31/05/2024 60 MD HASIN 0.80 0.76 95 0
1118 PURBA BARDHAMAN Memari - I Burdwan Division MAGRA PIPED WATER SUPPLY SCHEME IN MEMARI-1 BLOCK , SM/13491 New Continuation work for Supply of one no. Diesel / LPG / CNG driven Motor Cab / Maxi Cab (Air Condition) on hire basis for the office of the Superintending Engineer, Central Circle, P.H.E. Dte. to be used by the Deputy Superintending Engineer, Central Circle, P.H.E. Dte. [Period from 01.04.2024 to 31.05.2024] AE(HQs) J.E. 1 BURDWAN ORD/001230/2023-2024 233/AE/HQ 28/03/2024 60 MD HASIN 0.80 0.74 92.5 0
1119 PURBA BARDHAMAN Memari - I Burdwan Division MAGRA PIPED WATER SUPPLY SCHEME IN MEMARI-1 BLOCK , SM/13491 New MAGRA Piped Water Supply Scheme with Sinking of Tube-well, , Laying distribution system (LDS), Rising Main, FHTC, Construction of 250 cum capacity OHR with 20.0 mtr. with Staging height including soil investigation & construction of switch-rooms (5.40mx3.60m) & boundary walls with gate at different TW site. Block:- Memari-I, District:- Purba-Bardhaman.[NEW SCHEME] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000672/2022-2023 390/BWD 31/01/2023 365 M/S ASHA CONSTRUCTION 425.89 212.69 49.94 85
1120 PURBA BARDHAMAN Memari - I Burdwan Division MAGRA PIPED WATER SUPPLY SCHEME IN MEMARI-1 BLOCK , SM/13491 New Continuation work for Supply of one no. Diesel / LPG / CNG driven Motor Cab / Maxi Cab (Air Condition) on hire basis for the office of the Superintending Engineer, Central Circle, P.H.E. Dte. to be used by the Deputy Superintending Engineer, Central Circle, P.H.E. Dte. [Period from 01.08.2024 to 30.09.2024] AE(HQs) Contractual Junior Engineer ORD/000508/2024-2025 548/AE/HQ 01/08/2024 60 MD HASIN 0.80 0.75 93.75 0
1121 PURBA BARDHAMAN Memari - I Burdwan Division MAGRA PIPED WATER SUPPLY SCHEME IN MEMARI-1 BLOCK , SM/13491 New Field level data validation of FHTC executed by Agencies on the basis of pictorial data with the objective of controlling multiple entry,improving data quality in terms of absolute household by verification through electric connection or any other unique documents and making error free database of MAGRA Pipe Water Supply Scheme in Memari-I Block within Burdwan Sub-Division under Burdwan Division,PHE Dte JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000942/2024-2025 2731/BSD 10/12/2024 30 TECHVISION 0.80 0.00 0 0
1122 PURBA BARDHAMAN Memari - I Central Mechanical MAGRA PIPED WATER SUPPLY SCHEME IN MEMARI-1 BLOCK , SM/13491 New Supply and installation of Electro-Magnetic flow meter at HARIGRAM, KUCHUT & others water supply scheme under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. ASSISTANT ENGINEER Junior Engineer ORD/000564/2024-2025 3103/CMD 11/12/2024 60 S DUTTA 15.06 0.00 0 0
1123 PURBA BARDHAMAN Memari - I Burdwan Division MAGRA PIPED WATER SUPPLY SCHEME IN MEMARI-1 BLOCK , SM/13491 New Material Requisition To Resource Division RTOR000057/2024-2025 383/BWD 17/01/2025 Resource Division 12.34 0.00 0 0
1124 PURBA BARDHAMAN Memari - I Central Mechanical MAGRA PIPED WATER SUPPLY SCHEME IN MEMARI-1 BLOCK , SM/13491 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at Magra Water Supply Scheme [ Block- Memari-1 ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER Junior Engineer ORD/000650/2023-2024 3993/CMD 29/08/2023 611 ORIENTAL ENGINEERING CO. 29.35 0.00 0 95
1125 PURBA BARDHAMAN Memari - I Burdwan Division MAGRA PIPED WATER SUPPLY SCHEME IN MEMARI-1 BLOCK , SM/13491 New Continuation work for Supply of one no. Diesel / LPG / CNG driven Motor Cab / Maxi Cab (Air Condition) on hire basis for the office of the Superintending Engineer, Central Circle, P.H.E. Dte. to be used by the Deputy Superintending Engineer, Central Circle, P.H.E. Dte. [Period from 01.02.2025 to 31.03.2025] Contractual Junior Engineer ORD/001153/2024-2025 185/AE/HQ 31/01/2025 60 MD HASIN 0.80 0.00 0 0
1126 PURBA BARDHAMAN Memari - I Burdwan Division MAGRA PIPED WATER SUPPLY SCHEME IN MEMARI-1 BLOCK , SM/13491 New Restoration of Conc. road, Providing leftout FHTC with extension of Pipeline, construction of Pathway, drain, repairing of Pump House at Head Work site with allied works for MAGRA, SANUI, SATGACHIA Zone-I & NARAGOHALIA PIPED WATER SUPPLY SCHEME, Block-Memari-I, within Burdwan Sub Division under Burdwan Division PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/001192/2024-2025 611/BWD 11/02/2025 180 M/S ASHA CONSTRUCTION 354.13 0.00 0 0
1127 PURBA BARDHAMAN Memari - I Burdwan Division MAGRA PIPED WATER SUPPLY SCHEME IN MEMARI-1 BLOCK , SM/13491 New Continuation work for Supply of one no. Diesel / LPG / CNG driven Motor Cab / Maxi Cab (Air Condition) on hire basis for the office of the Superintending Engineer, Central Circle, P.H.E. Dte. to be used by the Deputy Superintending Engineer, Central Circle, P.H.E. Dte. [Period from 01.10.2024 to 30.11.2024] AE(HQs) Contractual Junior Engineer ORD/000708/2024-2025 803/AE/HQ 30/09/2024 60 MD HASIN 0.80 0.67 83.75 0
1128 PURBA BARDHAMAN Memari - I Burdwan Division MAGRA PIPED WATER SUPPLY SCHEME IN MEMARI-1 BLOCK , SM/13491 New Continuation work for Supply of one no. Diesel / LPG / CNG driven Motor Cab / Maxi Cab (Air Condition) on hire basis for the office of the Superintending Engineer, Central Circle, P.H.E. Dte. to be used by the Deputy Superintending Engineer, Central Circle, P.H.E. Dte. [Period from 01.12.2024 to 31.01.2025] AE(HQs) Contractual Junior Engineer ORD/000895/2024-2025 1009/AE/HQ 29/11/2024 60 MD HASIN 0.80 0.39 48.75 0
1129 PURBA BARDHAMAN Memari - I Burdwan Division MAGRA PIPED WATER SUPPLY SCHEME IN MEMARI-1 BLOCK , SM/13491 New Continuation work for Supply of one no. Diesel / LPG / CNG driven Motor Cab / Maxi Cab (Air Condition) on hire basis for the office of the Superintending Engineer, Central Circle, P.H.E. Dte. to be used by the Deputy Superintending Engineer, Central Circle, P.H.E. Dte. [Period from 01.04.2025 to 31.05.2025] Contractual Junior Engineer ORD/001404/2024-2025 455/AE/HQ 28/03/2025 60 MD HASIN 0.80 0.00 0 0
1130 PURBA BARDHAMAN Raina - II Burdwan Division UCHALAN PIPED WATER SUPPLY SCHEME , SM/13329 New Material Requisition To Resource Division RTOR000160/2023-2024 2155/BWD 10/05/2023 Resource Division 2.75 0.00 0 0
1131 PURBA BARDHAMAN Raina - II Burdwan Division UCHALAN PIPED WATER SUPPLY SCHEME , SM/13329 New Material Requisition To Resource Division RTOR000331/2023-2024 2197/BWD 12/05/2023 Resource Division 11.85 0.00 0 0
1132 PURBA BARDHAMAN Raina - II Burdwan Division UCHALAN PIPED WATER SUPPLY SCHEME , SM/13329 New Material Requisition To Resource Division RTOR000478/2023-2024 4002/BWD 08/09/2023 Resource Division 11.88 0.00 0 0
1133 PURBA BARDHAMAN Raina - II Burdwan Division UCHALAN PIPED WATER SUPPLY SCHEME , SM/13329 New Material Requisition To Resource Division RTOR000697/2023-2024 5067/BWD 23/11/2023 Resource Division 20.46 0.00 0 0
1134 PURBA BARDHAMAN Raina - II Central Mechanical UCHALAN PIPED WATER SUPPLY SCHEME , SM/13329 New New Service connection for Uchalan W/S Scheme PH No.-1 BILL/01794/2023-2024 BP-2023-24-299 30/12/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 4.13 0.00 0 0
1135 PURBA BARDHAMAN Raina - II Burdwan Division UCHALAN PIPED WATER SUPPLY SCHEME , SM/13329 New Continuation Work Order supply of inspection Vehicle for inspection of different JJM related(schemes)works as and when required including supply of driver & fuel(minimum 8 hours duty per day) and all taxes etc. for Burdwan Sub-Division under Burdwan Division,PHE Dte consider 96.00 Km. run per day (Period from 01-11-2023 to 31-01-2024) ORD/000985/2023-2024 2561/BSD 30/10/2023 66 MD HASIN 0.85 0.00 0 0
1136 PURBA BARDHAMAN Raina - II Central Mechanical UCHALAN PIPED WATER SUPPLY SCHEME , SM/13329 New New electric connection for Uchalan PWSS, PH-2. BILL/01882/2023-2024 BP-2023-24-341 11/01/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.50 0.00 0 0
1137 PURBA BARDHAMAN Raina - II Central Mechanical UCHALAN PIPED WATER SUPPLY SCHEME , SM/13329 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at Uchalan Water Supply Scheme [ Block- Raina-2 ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000910/2023-2024 4174/CMD 29/08/2023 30 M/S, S.DAS AND ENTERPRISE. 29.71 0.00 0 50
1138 PURBA BARDHAMAN Raina - II Central Mechanical UCHALAN PIPED WATER SUPPLY SCHEME , SM/13329 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Satinandi,Sanko & others water supply scheme under Galsi-1 Block ; Serpur, Uchalan & others water supply scheme under Raina-2 Block and maro, loapur & others water supply scheme under Galsi-2 block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000397/2024-2025 2751/CMD 24/09/2024 90 ORIENTAL ENGINEERING CO. 88.42 0.00 0 0
1139 PURBA BARDHAMAN Raina - II Burdwan Division UCHALAN PIPED WATER SUPPLY SCHEME , SM/13329 New Different works related (sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of different capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site) to UCHALAN, CHAK CHANDAN, SERPUR & KATNABIL Piped Water Supply Scheme under Raina II Block, District:- Purba Bardhaman [NEW SCHEME] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000367/2023-2024 3076/BWD 18/07/2023 806 SK ALIM 1,307.56 0.00 0 40
1140 PURBA BARDHAMAN Raina - II Burdwan Division UCHALAN PIPED WATER SUPPLY SCHEME , SM/13329 New Continuation Work Order for supply of inspection Vehicle for inspection of different JJM related (schemes)works as and when required including supply of driver & fuel(minimum 8 hours duty per day) and all taxes etc. for Burdwan Sub-Division under Burdwan Division,PHE Dte consider 96.00 Km. run per day (Period from 01-08-2024 to 31-10-2024) JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000557/2024-2025 1500/BSD 30/07/2024 66 PARVIN BEGAM 0.85 0.21 24.71 100
1141 PURBA BARDHAMAN Manteswar Burdwan Division Ground Water Supply Based Piped Water Supply Scheme For DHENUA PWSS in Manteshwar Block of Purab Burdwan District under Burdwan Division, PHE Dte. , SM/13331 New Material Requisition To Resource Division RTOR000244/2023-2024 2197/BWD 12/05/2023 Resource Division 4.24 0.00 0 0
1142 PURBA BARDHAMAN Manteswar Burdwan Division Ground Water Supply Based Piped Water Supply Scheme For DHENUA PWSS in Manteshwar Block of Purab Burdwan District under Burdwan Division, PHE Dte. , SM/13331 New Material Requisition To Resource Division RTOR000448/2023-2024 3972/BWD 08/09/2023 Resource Division 108.75 0.00 0 0
1143 PURBA BARDHAMAN Manteswar Central Mechanical Ground Water Supply Based Piped Water Supply Scheme For DHENUA PWSS in Manteshwar Block of Purab Burdwan District under Burdwan Division, PHE Dte. , SM/13331 New NEW SERVICE CONNECTION FOR DHENUA PWSS. BILL/02689/2023-2024 BP-2023-24-564 23/02/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 5.21 0.00 0 0
1144 PURBA BARDHAMAN Manteswar Central Mechanical Ground Water Supply Based Piped Water Supply Scheme For DHENUA PWSS in Manteshwar Block of Purab Burdwan District under Burdwan Division, PHE Dte. , SM/13331 New NEW SERVICE CONNECTION FOR DHENUA PWSS TW -1. BILL/03101/2023-2024 BP-2023-24-641 15/03/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 7.52 0.00 0 0
1145 PURBA BARDHAMAN Manteswar Burdwan Division Ground Water Supply Based Piped Water Supply Scheme For DHENUA PWSS in Manteshwar Block of Purab Burdwan District under Burdwan Division, PHE Dte. , SM/13331 New Different works related (sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of different capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site) to DHENUA, IBRAMBAD & UJNA Piped Water Supply Scheme under Manteswar Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer ,JUNIOR ENGINEER DURGAPUR SUB-DIVISION PHE DTE ORD/000462/2023-2024 3456/BWD 08/08/2023 365 M/S S. CHOUDHURY 2,123.70 71.21 3.35 20
1146 PURBA BARDHAMAN Manteswar Central Mechanical Ground Water Supply Based Piped Water Supply Scheme For DHENUA PWSS in Manteshwar Block of Purab Burdwan District under Burdwan Division, PHE Dte. , SM/13331 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Sutra & others water supply scheme under Monteswar Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000068/2024-2025 2396/CMD 02/08/2024 455 SINHA ELECTRICALS 78.06 0.00 0 20
1147 PURBA BARDHAMAN Manteswar Central Mechanical Ground Water Supply Based Piped Water Supply Scheme For DHENUA PWSS in Manteshwar Block of Purab Burdwan District under Burdwan Division, PHE Dte. , SM/13331 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at Dhenua Water Supply Scheme [ Block- Monteshwar ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000740/2023-2024 4050/CMD 29/08/2023 640 SUBRATA BHADRA 29.91 0.00 0 0
1148 PURBA BARDHAMAN Manteswar Burdwan Division Ground Water Supply Based Piped Water Supply Scheme For DHENUA PWSS in Manteshwar Block of Purab Burdwan District under Burdwan Division, PHE Dte. , SM/13331 New Arrangement of drinking water supply by installation of solar submersible pump including sinking of 200 mm. dia. Tube well 150 Mtr. Deep by direct rotary rig method, Laying dist. System, FHTC and 2 Nos. 5000 Ltr. PVC tank installation with construction of RCC structure for SAHAPUR Habitation which is uncovered of DHENUA Piped W/S. Scheme, Block Manteswar under Burdwan Division, PHE Dte. Assistant Engineer, Durgapur Sub Division, P.H.E. Dte JUNIOR ENGINEER DURGAPUR SUB-DIVISION PHE DTE ORD/000687/2024-2025 3668/BWD 22/10/2024 90 UJJWAL MUKHERJEE 34.32 0.00 0 50
1149 PURBA BARDHAMAN Manteswar Burdwan Division Ground Water Supply Based Piped Water Supply Scheme For DHENUA PWSS in Manteshwar Block of Purab Burdwan District under Burdwan Division, PHE Dte. , SM/13331 New Arrangement of drinking water supply by installation of solar submersible pump including sinking of 200 mm. dia. Tube well 150 Mtr. Deep by direct rotary rig method, Laying dist. System, FHTC and 2 Nos. 5000 Ltr. PVC tank installation with construction of RCC structure for RUIGORIA Habitation which is uncovered of DHENUA Piped W/S. Scheme, Block Manteswar under Burdwan Division, PHE Dte. Assistant Engineer, Durgapur Sub Division, P.H.E. Dte JUNIOR ENGINEER DURGAPUR SUB-DIVISION PHE DTE ORD/000686/2024-2025 3667/BWD 22/10/2024 90 UJJWAL MUKHERJEE 31.83 0.00 0 0
1150 PURBA BARDHAMAN Manteswar Central Mechanical Ground Water Supply Based Piped Water Supply Scheme For DHENUA PWSS in Manteshwar Block of Purab Burdwan District under Burdwan Division, PHE Dte. , SM/13331 New Electric quotation for Shifting of DP Structure adjacent to DHENUA water supply scheme, P.H No.-1 (Block- Monteswar) BILL/01790/2024-2025 null 18/03/2025 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 2.70 0.00 0 null
1151 PURBA BARDHAMAN Manteswar Central Mechanical Ground Water Supply Based Piped Water Supply Scheme For DHENUA PWSS in Manteshwar Block of Purab Burdwan District under Burdwan Division, PHE Dte. , SM/13331 New CONTINUATION ORDER-Hiring of inspection vehicle (Diesel/CNG/LPG Driven) for supervision of site for the office of the Assistant Engineer ,under CMD,PHE,Dte.[W.E.F-31/01/2025 TO 31/03/2025][UNDER JJM WORKS] ASSISTANT ENGINEER Junior Engineer ORD/000778/2024-2025 110/CMSD 30/01/2025 60 PRODYUT GHOSH 0.79 0.00 0 0
1152 PURBA BARDHAMAN Khandaghosh Burdwan Division KHEJURHATI PIPED WATER SUPPLY SCHEME , SM/14952 New Material Requisition To Resource Division RTOR000107/2023-2024 1965/BWD 26/04/2023 Resource Division 2.84 0.00 0 0
1153 PURBA BARDHAMAN Khandaghosh Burdwan Division KHEJURHATI PIPED WATER SUPPLY SCHEME , SM/14952 New Material Requisition To Resource Division RTOR000195/2023-2024 2155/BWD 10/05/2023 Resource Division 2.96 0.00 0 0
1154 PURBA BARDHAMAN Khandaghosh Central Mechanical KHEJURHATI PIPED WATER SUPPLY SCHEME , SM/14952 New New service connection charges for Khejurhati PWSS TW-1 BILL/01540/2023-2024 BP-2023-24-207 30/10/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 2.78 0.00 0 0
1155 PURBA BARDHAMAN Khandaghosh Central Mechanical KHEJURHATI PIPED WATER SUPPLY SCHEME , SM/14952 New New service connection charges for Khejurhati PWSS TW 2 BILL/01532/2023-2024 BP-2023-24-200 17/10/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 4.02 0.00 0 0
1156 PURBA BARDHAMAN Khandaghosh Burdwan Division KHEJURHATI PIPED WATER SUPPLY SCHEME , SM/14952 New Material Requisition To Resource Division RTOR000724/2023-2024 5276/BWD 30/11/2023 Resource Division 21.07 0.00 0 0
1157 PURBA BARDHAMAN Khandaghosh Central Mechanical KHEJURHATI PIPED WATER SUPPLY SCHEME , SM/14952 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at Khejurhati Water Supply Scheme [ Block- Khandoghosh ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER Junior Engineer ORD/000390/2023-2024 3662/CMD 01/08/2023 30 SINHA ELECTRICALS 28.98 11.34 39.13 98
1158 PURBA BARDHAMAN Khandaghosh Central Mechanical KHEJURHATI PIPED WATER SUPPLY SCHEME , SM/14952 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at KHEJURHATI & others water supply scheme under Khandoghosh Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman ASSISTANT ENGINEER Junior Engineer ORD/000071/2024-2025 2391/CMD 02/08/2024 90 C.M. ENTERPRISE 45.81 0.00 0 0
1159 PURBA BARDHAMAN Khandaghosh Burdwan Division KHEJURHATI PIPED WATER SUPPLY SCHEME , SM/14952 New Material Requisition To Resource Division RTOR000064/2024-2025 390/BWD 17/01/2025 Resource Division 1.27 0.00 0 0
1160 PURBA BARDHAMAN Khandaghosh Burdwan Division KHEJURHATI PIPED WATER SUPPLY SCHEME , SM/14952 New Different works related (sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of different capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site) to CHAGRAM & KHEJURHATI Piped Water Supply Scheme under Khandaghosh Block, District:- Purba Bardhaman [NEW SCHEME] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer1, Durgapur Sub-Division, PHE Dte.,Junior Engineer2, Durgapur Sub-Division, PHE Dte. ORD/000083/2023-2024 2080/BWD 04/05/2023 698 KHAN ENTERPRISE 688.15 0.00 0 58
1161 PURBA BARDHAMAN Khandaghosh Burdwan Division KHEJURHATI PIPED WATER SUPPLY SCHEME , SM/14952 New Balance work for providing Functional Household Tap Connection (FHTC) within the command area KHEJURHATI & GUIR W/S. Scheme of Khandaghosh Block under Burdwan Division, PHE. Dte. Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/001217/2024-2025 724/BWD 24/02/2025 120 ROY CONSTRUCTION 153.99 0.00 0 0
1162 PURBA BARDHAMAN Kalna - I Burdwan Division SHIKARPUR PIPED WATER SUPPLY SCHEME , SM/14437 New Material Requisition To Resource Division RTOR000089/2022-2023 1249/BWD 17/03/2023 Resource Division 15.17 0.00 0 0
1163 PURBA BARDHAMAN Kalna - I Burdwan Division SHIKARPUR PIPED WATER SUPPLY SCHEME , SM/14437 New Material Requisition To Resource Division RTOR000037/2023-2024 1962/BWD 25/04/2023 Resource Division 41.55 0.00 0 0
1164 PURBA BARDHAMAN Kalna - I Central Mechanical SHIKARPUR PIPED WATER SUPPLY SCHEME , SM/14437 New Quotation for new electric service connection at Shikarpur PH NO.-2 BILL/01736/2023-2024 BP-2023-24-247 07/12/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 8.73 0.00 0 0
1165 PURBA BARDHAMAN Kalna - I Central Mechanical SHIKARPUR PIPED WATER SUPPLY SCHEME , SM/14437 New Electric quotation for New Service Connection at Shikarpur W/S Scehem PH-I. BILL/01774/2023-2024 BP-2023-24-287 26/12/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 6.57 0.00 0 0
1166 PURBA BARDHAMAN Kalna - I Central Mechanical SHIKARPUR PIPED WATER SUPPLY SCHEME , SM/14437 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at SHIKARPUR Water Supply Scheme [ Block- KALNA-1] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000836/2023-2024 4110/CMD 29/08/2023 30 CHOUDHURY ENTERPRISE 30.14 0.00 0 50
1167 PURBA BARDHAMAN Kalna - I Burdwan Division SHIKARPUR PIPED WATER SUPPLY SCHEME , SM/14437 New Work Order For "CONSTRUCTION OF TEMPORARY KIOSK FOR THE NECESSARY ARRANGEMENT OF ELECTRIFICATION OF TUBEWELL FOR NANDAI PWSS & SHIKARPUR PWSS UNDER KALNA SUB-DIVISION UNDER BURDWAN DIVISION, PHE DTE." Assistant Engineer Junior Engineer, R.W.S. Burdwan Sub Division, P.H.E. Dt ORD/001144/2023-2024 1980/KSD 09/02/2024 10 ER CONSTRUCTION & GENERAL ORDER SUPPLIER 0.66 0.00 0 100
1168 PURBA BARDHAMAN Kalna - I Central Mechanical SHIKARPUR PIPED WATER SUPPLY SCHEME , SM/14437 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Joykrishnapur & others water supply scheme under Purbasthali-2,jamalpur,kalna 1 Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000101/2024-2025 2398/CMD 02/08/2024 90 MS S G ENTERPRISE 53.43 0.00 0 0
1169 PURBA BARDHAMAN Kalna - I Burdwan Division SHIKARPUR PIPED WATER SUPPLY SCHEME , SM/14437 New Different works related (sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of different capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site) to DEARA, PATHARDANGA & SHIKARPUR Piped Water Supply Scheme under KALNA-I Block, District:- Purba Bardhaman [NEW SCHEME] Assistant Engineer Junior Engineer, R.W.S. Burdwan Sub Division, P.H.E. Dt ORD/000734/2022-2023 1004/BWD 06/03/2023 365 M/S TAPAS KUMAR CHAKRABORTY 1,584.09 0.00 0 75
1170 PURBA BARDHAMAN Kalna - I Burdwan Division SHIKARPUR PIPED WATER SUPPLY SCHEME , SM/14437 New Work Order for " Restoration of pipeline with other allied works at different places of Shikarpur mouja under Shikarpur Pwss due to construction of rcc cover drain & widening of rcc concrete road constructed by PRI body under Kalna-I panchayat samiti under Kalna Sub-Division under Burdwan Division, PHE Dte.". Assistant Engineer Junior Engineer, R.W.S. Burdwan Sub Division, P.H.E. Dt ORD/000526/2024-2025 969/KSD 31/07/2024 10 M/S TAPAS KUMAR CHAKRABORTY 3.58 0.00 0 100
1171 PURBA BARDHAMAN Kalna - I Burdwan Division SHIKARPUR PIPED WATER SUPPLY SCHEME , SM/14437 New Supply & Laying of 300mm Dia M.S.E.R.W Pipe including Jack Pushing along with other allied work in connection with different Augmentation & New [(SM/18439, SM/14437, SM/14435, SM/07805, SM/14440, SM/15571, SM/08030, SM/16014, SM/15588, SM/16298 & SM/16307)] under Kalna Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/001187/2024-2025 608/BWD 11/02/2025 180 MANASH GHOSH 1,209.62 0.00 0 0
1172 PURBA BARDHAMAN Kalna - I Burdwan Division SHIKARPUR PIPED WATER SUPPLY SCHEME , SM/14437 New Temporary approach road from Shikarpur Graveyard to OHr site and Shikarpur Bus stand to 2nd tube well site in order to carry building materials for Shikarpur Piped W/S. Scheme (SM/14437) within Kalna Sub-Division under Burdwan Division, PHE. Dte. Assistant Engineer Junior Engineer, R.W.S. Burdwan Sub Division, P.H.E. Dt ORD/001229/2024-2025 767/BWD 27/02/2025 15 M/S TAPAS KUMAR CHAKRABORTY 5.75 0.00 0 0
1173 PURBA BARDHAMAN Kalna - I Burdwan Division SHIKARPUR PIPED WATER SUPPLY SCHEME , SM/14437 New Pipeline laying by HDD method and different types of balance works in connection with different Augmentation & New Scheme [(SM/ 08103), (SM/13413), (SM/15587), (SM/16035), (SM/16287), (SM/16029), (SM/15581), (SM/14437), (SM/16028), (SM/16036) & (SM/14425)] within Kalna Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer ORD/001270/2024-2025 849/BWD 05/03/2025 180 S.P. CONSTRUCTION 683.30 0.00 0 0
1174 PURBA BARDHAMAN Mangolkote Burdwan Division JABAGRAM PIPED WATER SUPPLY SCHEME , SM/14980 New Material Requisition To Resource Division RTOR000060/2022-2023 1257/BWD 17/03/2023 Resource Division 13.53 0.00 0 0
1175 PURBA BARDHAMAN Mangolkote Burdwan Division JABAGRAM PIPED WATER SUPPLY SCHEME , SM/14980 New Material Requisition To Resource Division RTOR000112/2022-2023 1646/BWD 06/04/2023 Resource Division 1.65 0.00 0 0
1176 PURBA BARDHAMAN Mangolkote Central Mechanical JABAGRAM PIPED WATER SUPPLY SCHEME , SM/14980 New New Service connection charges for Jabagram W/S Scheme TW-I BILL/00572/2023-2024 BP-2023-24-8 12/05/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 0.81 0.00 0 0
1177 PURBA BARDHAMAN Mangolkote Burdwan Division JABAGRAM PIPED WATER SUPPLY SCHEME , SM/14980 New Material Requisition To Resource Division RTOR000703/2023-2024 5061/BWD 23/11/2023 Resource Division 19.78 0.00 0 0
1178 PURBA BARDHAMAN Mangolkote Burdwan Division JABAGRAM PIPED WATER SUPPLY SCHEME , SM/14980 New Continuation order for Supply of 1 (one) No. Inspection Vehicle for different JJM Related Works as and when required including supply of driver and fuels (Minimum 8 Hours of duty) under Katwa Sub-Division within Burdwan Division, P.H.E. Dte. Consider 96.00 Km run per Day. (Sl No-1) Assistant Engineer JUNIOR ENGINEER KATWA SUB-DIVISION PHE DTE ORD/000930/2023-2024 1016/KTS 20/09/2023 23 M/S MUNMUN DEY 0.30 0.00 0 0
1179 PURBA BARDHAMAN Mangolkote Central Mechanical JABAGRAM PIPED WATER SUPPLY SCHEME , SM/14980 New NEW SERVICE CONNECTION FOR JABAGRAM PWSS TW-2. BILL/00008/2024-2025 BP-2024-25-1 04/04/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 5.75 0.00 0 0
1180 PURBA BARDHAMAN Mangolkote Burdwan Division JABAGRAM PIPED WATER SUPPLY SCHEME , SM/14980 New Different works related (sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of different capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site) to GOHAGRAM, KHERUA & JABAGRAM Piped Water Supply Scheme under Mangalkote Block, District:- Purba Bardhaman [NEW SCHEME] Assistant Engineer JUNIOR ENGINEER KATWA SUB-DIVISION PHE DTE,JUNIOR ENGINEER R.W.S. BURDWAN SUB-DIVISION PHE DTE ORD/000697/2022-2023 582/BWD 17/02/2023 365 PUSPA ENTERPRISE 1,185.88 0.00 0 73
1181 PURBA BARDHAMAN Mangolkote Central Mechanical JABAGRAM PIPED WATER SUPPLY SCHEME , SM/14980 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Jabagram & others water supply scheme under Mangalkote Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. Driller In-Charge Junior Engineer ORD/000118/2024-2025 2590/CMD 27/08/2024 90 M/S SAJAHAN CHOWDHURY 62.06 0.00 0 0
1182 PURBA BARDHAMAN Mangolkote Central Mechanical JABAGRAM PIPED WATER SUPPLY SCHEME , SM/14980 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at JABAGRAM Water Supply Scheme [ Block- MONGOLKOTE] under CMD, PHE Dte., Dist.- Purba-Bardhaman. Driller In-Charge Junior Engineer ORD/000035/2023-2024 2472/CMD 30/05/2023 570 ANANTA ELECTRICAL ENGINEERING CONSTRUCTION 28.96 10.82 37.36 88
1183 PURBA BARDHAMAN Mangolkote Burdwan Division JABAGRAM PIPED WATER SUPPLY SCHEME , SM/14980 New Different types of works involve in connection with implementation of Gohgram, Jabagram, Kherua, Lakshmipur & Simulia Piped Water Supply Scheme under Mongolkote Block within Katwa Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer ORD/001301/2024-2025 936/BWD 11/03/2025 180 M/S GHOSH CONSTRUCTION 360.68 0.00 0 0
1184 PURBA BARDHAMAN Burdwan - I Burdwan Division KURMUN PIPED WATER SUPPLY SCHEME , SM/13943 New Material Requisition To Resource Division RTOR000102/2023-2024 1962/BWD 25/04/2023 Resource Division 9.02 0.00 0 0
1185 PURBA BARDHAMAN Burdwan - I Burdwan Division KURMUN PIPED WATER SUPPLY SCHEME , SM/13943 New Material Requisition To Resource Division RTOR000391/2023-2024 2197/BWD 12/05/2023 Resource Division 9.67 0.00 0 0
1186 PURBA BARDHAMAN Burdwan - I Burdwan Division KURMUN PIPED WATER SUPPLY SCHEME , SM/13943 New Material Requisition To Resource Division RTOR000725/2023-2024 5271/BWD 30/11/2023 Resource Division 21.07 0.00 0 0
1187 PURBA BARDHAMAN Burdwan - I Central Mechanical KURMUN PIPED WATER SUPPLY SCHEME , SM/13943 New New service connection charges for Kurmun PWSS TW-1 BILL/01675/2023-2024 BP-2023-24-226 10/11/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 5.00 0.00 0 0
1188 PURBA BARDHAMAN Burdwan - I Burdwan Division KURMUN PIPED WATER SUPPLY SCHEME , SM/13943 New KURMUN Piped Water Supply Scheme with sinking of Tube-well, LDS, Rising Main, FHTC, Construction of 350 cum capacity RCC OHR with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drain and internal pathway at different TW site under Burdwan-I Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000659/2023-2024 4124/BWD 14/09/2023 365 GHOSH CONCERN 550.63 65.86 11.96 35
1189 PURBA BARDHAMAN Burdwan - I Central Mechanical KURMUN PIPED WATER SUPPLY SCHEME , SM/13943 New New service connection for Kurmun PWSS BILL/02857/2023-2024 BP-2023-24-603 06/03/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.63 0.00 0 0
1190 PURBA BARDHAMAN Burdwan - I Burdwan Division KURMUN PIPED WATER SUPPLY SCHEME , SM/13943 New Supply of inspection Vehicle for inspection of different JJM related(schemes)works as and when required including supply of driver & fuel(minimum 8 hours duty per day) and all taxes etc. for Burdwan Sub-Division under Burdwan Division,PHE Dte consider 96.00 Km. run per day (Period from 01-02-2024 to 30-04-2024) Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/001181/2023-2024 188/BSD 31/01/2024 66 PARVIN BEGAM 0.85 0.00 0 97
1191 PURBA BARDHAMAN Burdwan - I Burdwan Division KURMUN PIPED WATER SUPPLY SCHEME , SM/13943 New Supply, delivery, installation & hand hold demonstration of different equipments / machineries to test HDPE pipes as per IS: 4984-2016 at the pipe testing laboratory at Nababhat under Burdwan Division, PHE. Dte._2ND CALL AE(HQs) J.E. 1 BURDWAN ORD/001212/2023-2024 907/BWD 04/03/2024 30 MANASH GHOSH 23.87 0.00 0 100
1192 PURBA BARDHAMAN Burdwan - I Central Mechanical KURMUN PIPED WATER SUPPLY SCHEME , SM/13943 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at MALKITA & others water supply scheme under Bardhaman-I Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman ASSISTANT ENGINEER Junior Engineer ORD/000066/2024-2025 2388/CMD 02/08/2024 90 ELECTRICAL & MECHANICAL ENGINEERING CORPORATION 55.95 0.00 0 0
1193 PURBA BARDHAMAN Burdwan - I Central Mechanical KURMUN PIPED WATER SUPPLY SCHEME , SM/13943 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at Kurmun Water Supply Scheme [ Block- Burdwan-1 ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER Junior Engineer ORD/000658/2023-2024 4001/CMD 29/08/2023 30 S.P. CONSTRUCTION 28.96 0.00 0 95
1194 PURBA BARDHAMAN Burdwan - I Burdwan Division KURMUN PIPED WATER SUPPLY SCHEME , SM/13943 New Material Requisition To Resource Division RTOR000066/2024-2025 392/BWD 17/01/2025 Resource Division 8.43 0.00 0 0
1195 PURBA BARDHAMAN Burdwan - I Burdwan Division KURMUN PIPED WATER SUPPLY SCHEME , SM/13943 New Balance work [ i.e. Extension or parallel Pipeline, Leftout FHTC, Road Restoration work, Sinking of Additional Tube Well with Pump House & Boundary wall, inter Connection of Additional Tube Well, with allied work of KURMUN Piped Water Supply Scheme, Block-Burdwan- I under Burdwan Sub Division, PHE Dte. within Burdwan Division PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/001220/2024-2025 727/BWD 24/02/2025 120 SHIVAM UN-EMPLOYED ENGINEERS CO-OPERATIVE SOCIETY LTD. 95.65 0.00 0 0
1196 PURBA BARDHAMAN Ausgram-I,Ausgram-II,Bhatar,Burdwan-I,Galsi-I,Galsi-II,Kalna-I,Kalna-II,Katwa-I,Katwa-II,Ketugram-I,Ketugram-II,Khandaghosh,Mangolkote,Manteswar,Memari-II,Purbasthali-I,Raina-I,Raina-II Central Mechanical GROUND WATER BASED MINI PIPED WATER SUPPLY SCHEMES AT UNCOVERED VILLAGES IN ALL BLOCKS WITHIN PURBA BARDHAMAN DISTRICT UNDER BURDWAN DIVISION PHE DTE , SM/14132 New Supply & Installation of Submersible Pumping Machinery , Voltage Stabilizer, Chlorination system and internal House wiring for Tube well no.- 6 at Augmentation of Bhatar (Zone - II) (Bhumsor) Water Supply Scheme under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000933/2022-2023 1310/CMD 22/03/2023 30 SUDIPTA GHOSH 12.05 0.00 0 95
1197 PURBA BARDHAMAN Ausgram-I,Ausgram-II,Bhatar,Burdwan-I,Galsi-I,Galsi-II,Kalna-I,Kalna-II,Katwa-I,Katwa-II,Ketugram-I,Ketugram-II,Khandaghosh,Mangolkote,Manteswar,Memari-II,Purbasthali-I,Raina-I,Raina-II Central Mechanical GROUND WATER BASED MINI PIPED WATER SUPPLY SCHEMES AT UNCOVERED VILLAGES IN ALL BLOCKS WITHIN PURBA BARDHAMAN DISTRICT UNDER BURDWAN DIVISION PHE DTE , SM/14132 New Quotation for new service connection at Nabagram PWSS TW-3 BILL/00960/2024-2025 BP-2024-25-381 14/11/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 19.77 0.00 0 0
1198 PURBA BARDHAMAN Ausgram-I,Ausgram-II,Bhatar,Burdwan-I,Galsi-I,Galsi-II,Kalna-I,Kalna-II,Katwa-I,Katwa-II,Ketugram-I,Ketugram-II,Khandaghosh,Mangolkote,Manteswar,Memari-II,Purbasthali-I,Raina-I,Raina-II Central Mechanical GROUND WATER BASED MINI PIPED WATER SUPPLY SCHEMES AT UNCOVERED VILLAGES IN ALL BLOCKS WITHIN PURBA BARDHAMAN DISTRICT UNDER BURDWAN DIVISION PHE DTE , SM/14132 New Quotation for new service connection at Jahannagar Augmentation PWSS TW-3 BILL/01036/2024-2025 BP-2024-25-382 14/11/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 7.54 0.00 0 0
1199 PURBA BARDHAMAN Ausgram-I,Ausgram-II,Bhatar,Burdwan-I,Galsi-I,Galsi-II,Kalna-I,Kalna-II,Katwa-I,Katwa-II,Ketugram-I,Ketugram-II,Khandaghosh,Mangolkote,Manteswar,Memari-II,Purbasthali-I,Raina-I,Raina-II Burdwan Division GROUND WATER BASED MINI PIPED WATER SUPPLY SCHEMES AT UNCOVERED VILLAGES IN ALL BLOCKS WITHIN PURBA BARDHAMAN DISTRICT UNDER BURDWAN DIVISION PHE DTE , SM/14132 New Conducting physical Household Survey at the IMIS reported village for HGJ certification and providing balance FHTC for Har Ghar Jal certification including conducting Gram Sabhas for different IMIS reported villages across the district under Burdwan Division, PHE Dte. AE(HQs),Assistant Engineer ,Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE.,Assistant Engineer, Durgapur Sub Division, P.H.E. Dte JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000428/2024-2025 3107/BWD 12/08/2024 90 TUBGRAM GRAMMYAK UNNAYAN SAMITY 309.60 0.00 0 50
1200 PURBA BARDHAMAN Ausgram-I,Ausgram-II,Bhatar,Burdwan-I,Galsi-I,Galsi-II,Kalna-I,Kalna-II,Katwa-I,Katwa-II,Ketugram-I,Ketugram-II,Khandaghosh,Mangolkote,Manteswar,Memari-II,Purbasthali-I,Raina-I,Raina-II Burdwan Division GROUND WATER BASED MINI PIPED WATER SUPPLY SCHEMES AT UNCOVERED VILLAGES IN ALL BLOCKS WITHIN PURBA BARDHAMAN DISTRICT UNDER BURDWAN DIVISION PHE DTE , SM/14132 New Implementation of Ground Water Based Mini Piped Water supply Scheme in 129 Nos. villages in Aushgram I & II, Burdwan I & II, Galsi I & II, Katwa I & II, Ketugream I & II, Raina I & II, Bhatar, Khandaghosh, Mongalkote and Memari II Block maximum 100 households in Purba Bardhaman district under Burdwan Division, PHE. Dte. Assistant Engineer ,Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE.,Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer ORD/000703/2022-2023 641/BWD 20/02/2023 800 BIRBHUM INFRAPARK PRIVATE LIMITED 4,231.72 469.70 11.1 42
1201 PURBA BARDHAMAN Raina - II Burdwan Division Katnabil Piped Water Supply Scheme , SM/13338 New Material Requisition To Resource Division RTOR000375/2023-2024 2197/BWD 12/05/2023 Resource Division 4.23 0.00 0 0
1202 PURBA BARDHAMAN Raina - II Burdwan Division Katnabil Piped Water Supply Scheme , SM/13338 New Material Requisition To Resource Division RTOR000512/2023-2024 4036/BWD 08/09/2023 Resource Division 4.83 0.00 0 0
1203 PURBA BARDHAMAN Raina - II Burdwan Division Katnabil Piped Water Supply Scheme , SM/13338 New Material Requisition To Resource Division RTOR000673/2023-2024 5050/BWD 23/11/2023 Resource Division 20.46 0.00 0 0
1204 PURBA BARDHAMAN Raina - II Central Mechanical Katnabil Piped Water Supply Scheme , SM/13338 New New service connection charges for Katnabil PWSS TW-1 BILL/01700/2023-2024 BP-2023-24-231 20/11/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 7.27 0.00 0 0
1205 PURBA BARDHAMAN Raina - II Central Mechanical Katnabil Piped Water Supply Scheme , SM/13338 New New Service connection for Katnabil W/S Scheme PH No.-II BILL/01800/2023-2024 BP-2023-24-300 30/12/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 10.15 0.00 0 0
1206 PURBA BARDHAMAN Raina - II Central Mechanical Katnabil Piped Water Supply Scheme , SM/13338 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Satinandi,Sanko & others water supply scheme under Galsi-1 Block ; Serpur, Uchalan & others water supply scheme under Raina-2 Block and maro, loapur & others water supply scheme under Galsi-2 block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000397/2024-2025 2751/CMD 24/09/2024 90 ORIENTAL ENGINEERING CO. 88.42 0.00 0 0
1207 PURBA BARDHAMAN Raina - II Burdwan Division Katnabil Piped Water Supply Scheme , SM/13338 New Different works related (sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of different capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site) to UCHALAN, CHAK CHANDAN, SERPUR & KATNABIL Piped Water Supply Scheme under Raina II Block, District:- Purba Bardhaman [NEW SCHEME] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000367/2023-2024 3076/BWD 18/07/2023 806 SK ALIM 1,307.56 0.00 0 40
1208 PURBA BARDHAMAN Raina - II Burdwan Division Katnabil Piped Water Supply Scheme , SM/13338 New Material Requisition To Resource Division RTOR000085/2024-2025 411/BWD 17/01/2025 Resource Division 3.89 0.00 0 0
1209 PURBA BARDHAMAN Raina - II Central Mechanical Katnabil Piped Water Supply Scheme , SM/13338 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at Katnabil Water Supply Scheme [ Block- Raina-2 ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000727/2023-2024 4038/CMD 29/08/2023 581 AHALYA ENGINEERING WORKS 28.95 5.67 19.59 96
1210 PURBA BARDHAMAN Raina - II Burdwan Division Katnabil Piped Water Supply Scheme , SM/13338 New Supply of various D.I. Mechanical joints & specials for KATNABIL & BANTIR Piped W/S. Scheme within Burdwan Sub-Division under Burdwan Division, PHE. Dte. [Part-B]. AE(HQs) JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000302/2024-2025 2825/BWD 19/07/2024 216 KEJRIWAL CASTINGS LIMITED 4.82 0.00 0 100
1211 PURBA BARDHAMAN Raina - II Burdwan Division Katnabil Piped Water Supply Scheme , SM/13338 New Supply of various D.I. Mechanical joints & specials for KATNABIL & BANTIR Piped W/S. Scheme within Burdwan Sub-Division under Burdwan Division, PHE. Dte. [Part-A]. AE(HQs) JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000313/2024-2025 2837/BWD 19/07/2024 215 ELECTROSTEEL CASTING LIMITED 4.95 0.00 0 100
1212 PURBA BARDHAMAN Raina - II Burdwan Division Katnabil Piped Water Supply Scheme , SM/13338 New Supply of various D.I. Mechanical joints & specials for KATNABIL & BANTIR Piped W/S. Scheme within Burdwan Sub-Division under Burdwan Division, PHE. Dte. [Part-C]. AE(HQs) JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000306/2024-2025 2829/BWD 19/07/2024 225 JINDAL SAW LTD. 4.63 0.00 0 100
1213 PURBA BARDHAMAN Burdwan - II Burdwan Division GROUND WATER BASED KANDARSONA PWSS , SM/13339 New Material Requisition To Resource Division RTOR000068/2022-2023 1256/BWD 17/03/2023 Resource Division 6.23 0.00 0 0
1214 PURBA BARDHAMAN Burdwan - II Burdwan Division GROUND WATER BASED KANDARSONA PWSS , SM/13339 New Material Requisition To Resource Division RTOR000113/2022-2023 1962/BWD 25/04/2023 Resource Division 3.30 0.00 0 0
1215 PURBA BARDHAMAN Burdwan - II Central Mechanical GROUND WATER BASED KANDARSONA PWSS , SM/13339 New New Service Connection charges for Kandarsona W/S Scheme TW-1 BILL/00604/2023-2024 BP-2023-24-11 17/05/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.35 0.00 0 0
1216 PURBA BARDHAMAN Burdwan - II Central Mechanical GROUND WATER BASED KANDARSONA PWSS , SM/13339 New New Service Connection charges for Kandarsona W/S Scheme TW-2 BILL/00605/2023-2024 BP-2023-24-12 17/05/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 4.40 0.00 0 0
1217 PURBA BARDHAMAN Burdwan - II Burdwan Division GROUND WATER BASED KANDARSONA PWSS , SM/13339 New Material Requisition To Resource Division RTOR000721/2023-2024 5262/BWD 30/11/2023 Resource Division 21.07 0.00 0 0
1218 PURBA BARDHAMAN Burdwan - II Central Mechanical GROUND WATER BASED KANDARSONA PWSS , SM/13339 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at Kandarsona Water Supply Scheme [Block- Burdwan-2] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER Junior Engineer ORD/000033/2023-2024 2471/CMD 30/05/2023 30 DUTTA ENTERPRISE 28.92 21.55 74.52 80
1219 PURBA BARDHAMAN Burdwan - II Central Mechanical GROUND WATER BASED KANDARSONA PWSS , SM/13339 New Re-orientation of delivery pipe line by supply & fitting fixing different CIDF materials, pressure gauge etc. at Kandarsona water supply scheme, T.W. No.- I & II under CMD, P.H.E. Dte., Dist.- Purba Bardhaman. ASSISTANT ENGINEER Junior Engineer ORD/001707/2023-2024 843/CMSD 18/10/2023 10 DUTTA ENTERPRISE 0.79 0.00 0 99
1220 PURBA BARDHAMAN Burdwan - II Central Mechanical GROUND WATER BASED KANDARSONA PWSS , SM/13339 New Supply & delivery of standby Submersible pumping machinery for Kandarsona & others water supply scheme, under CMD, P.H.E. Dte., Dist.- Purba Bardhaman ASSISTANT ENGINEER Junior Engineer ORD/001638/2023-2024 823/CMSD 05/10/2023 21 DUTTA ENTERPRISE 0.84 0.00 0 98
1221 PURBA BARDHAMAN Burdwan - II Central Mechanical GROUND WATER BASED KANDARSONA PWSS , SM/13339 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at KUSHA & others water supply scheme under Bardhaman-II Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman ASSISTANT ENGINEER Junior Engineer ORD/000065/2024-2025 2389/CMD 02/08/2024 90 DILIP MAHATO 53.14 0.00 0 0
1222 PURBA BARDHAMAN Burdwan - II Central Mechanical GROUND WATER BASED KANDARSONA PWSS , SM/13339 New Supply and installation of Electro-Magnetic flow meter at HARIGRAM, KUCHUT & others water supply scheme under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. ASSISTANT ENGINEER Junior Engineer ORD/000564/2024-2025 3103/CMD 11/12/2024 60 S DUTTA 15.06 0.00 0 0
1223 PURBA BARDHAMAN Burdwan - II Burdwan Division GROUND WATER BASED KANDARSONA PWSS , SM/13339 New KANDARSONA Piped Water Supply Scheme with Sinking of tube-well, LDS, Rising Main, FHTC, Construction of 150 cum capacity RCC OHR with 20.0 mtr. with Staging height including soil investigation & construction of switch-rooms & boundary walls at different TW site under Burdwan-II Block, District:- Purba-Bardhaman. [NEW SCHEME] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. Junior Engineer, Burdwan Sadar Sub-Division ORD/000655/2022-2023 358/BWD 30/01/2023 701 M/S S.S. ENTERPRISE 284.66 190.83 67.04 90
1224 PURBA BARDHAMAN Burdwan - II Burdwan Division GROUND WATER BASED KANDARSONA PWSS , SM/13339 New Beautification of PWSS with Arboriculture, Recharge Pit including shaft and anciliary works) Kandarsona P.W.S.S under Burdwan Division, PHE Dte. ASSISTANT ENGINEER R.W.S. BURDWAN SUB-DIVISION PHE DTE Junior Engineer, R.W.S. Burdwan Sub Division, P.H.E. Dt ORD/000544/2024-2025 279/RWS 03/09/2024 110 M/S PALASH BISWAS 0.97 0.00 0 100
1225 PURBA BARDHAMAN Ausgram - II Burdwan Division CHAK RADHAMOHANPUR PIPED WATER SUPPLY SCHEME , SM/13466 New Material Requisition To Resource Division RTOR000079/2022-2023 1266/BWD 17/03/2023 Resource Division 3.10 0.00 0 0
1226 PURBA BARDHAMAN Ausgram - II Burdwan Division CHAK RADHAMOHANPUR PIPED WATER SUPPLY SCHEME , SM/13466 New Material Requisition To Resource Division RTOR000097/2022-2023 1635/BWD 06/04/2023 Resource Division 16.63 0.00 0 0
1227 PURBA BARDHAMAN Ausgram - II Central Mechanical CHAK RADHAMOHANPUR PIPED WATER SUPPLY SCHEME , SM/13466 New New service connection charges for Chak Radhamohanpur PWSS TW-1 BILL/00759/2023-2024 BP-2023-24-59 17/07/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 2.13 0.00 0 0
1228 PURBA BARDHAMAN Ausgram - II Central Mechanical CHAK RADHAMOHANPUR PIPED WATER SUPPLY SCHEME , SM/13466 New New service connection charges for Chak Radhamohanpur PWSS TW-2 BILL/00764/2023-2024 BP-2023-24-62 18/07/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 6.09 0.00 0 0
1229 PURBA BARDHAMAN Ausgram - II Burdwan Division CHAK RADHAMOHANPUR PIPED WATER SUPPLY SCHEME , SM/13466 New Material Requisition To Resource Division RTOR000593/2023-2024 4901/BWD 10/11/2023 Resource Division 34.12 0.00 0 0
1230 PURBA BARDHAMAN Ausgram - II Central Mechanical CHAK RADHAMOHANPUR PIPED WATER SUPPLY SCHEME , SM/13466 New Addl. Quotation for new electric service connection at Chak Radhamohanpur PH NO.-2 BILL/01757/2023-2024 BP-2023-24-265 11/12/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 1.76 0.00 0 0
1231 PURBA BARDHAMAN Ausgram - II Central Mechanical CHAK RADHAMOHANPUR PIPED WATER SUPPLY SCHEME , SM/13466 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at Chak Radhamohanpur Water Supply Scheme [ Block- Ausgram-2 ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. Driller In-Charge JUNIOR ENGINEER ORD/000040/2023-2024 2492/CMD 01/06/2023 30 MS DAS ELECTRIC CO 27.73 15.85 57.16 40
1232 PURBA BARDHAMAN Ausgram - II Central Mechanical CHAK RADHAMOHANPUR PIPED WATER SUPPLY SCHEME , SM/13466 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Chora, Kalaijhuti & others water supply scheme under Ausgram-2 Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. Driller In-Charge JUNIOR ENGINEER ORD/000143/2024-2025 2405/CMD 02/08/2024 90 NABAUDYOG ELECTRICAL ENGINEERING CO-OPERATIVE SOCIETY LTD 95.26 0.00 0 0
1233 PURBA BARDHAMAN Ausgram - II Durgapur W/S Division CHAK RADHAMOHANPUR PIPED WATER SUPPLY SCHEME , SM/13466 New Acceptance cum Formal Work Order for Additional Distribution Pipeline work at CHAK RADHAMOHANPUR Piped Water Supply Scheme (Chak Radhamohanpur Muslimpara and Chak Radhamohanpur Hatchery Para) with LDS & FHTC work under Ausgram-II Block, Dist- Purba Bardhaman under Durgapur W/S Division, PHE Dte. Assistant Engineer-II Contractual Junior Engineer_2 ORD/000146/2024-2025 1381/DWSD 26/09/2024 45 HAMID SK 18.67 0.00 0 100
1234 PURBA BARDHAMAN Ausgram - II Burdwan Division CHAK RADHAMOHANPUR PIPED WATER SUPPLY SCHEME , SM/13466 New CHAK RADHAMOHANPUR Piped Water Supply Scheme with Sinking of tube-well, LDS, Rising Main, FHTC & construction of switch-rooms & boundary walls at different TW site under Aushgram-II Block, District:- Purba-Bardhaman [NEW SCHEME]. Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer ORD/000677/2022-2023 453/BWD 06/02/2023 240 HAMID SK 122.63 68.88 56.17 100
1235 PURBA BARDHAMAN Ausgram - II Durgapur W/S Division CHAK RADHAMOHANPUR PIPED WATER SUPPLY SCHEME , SM/13466 New Material Requisition To Resource Division RTOR000039/2024-2025 459/DWSD 17/03/2025 Resource Division 0.14 0.00 0 0
1236 PURBA BARDHAMAN Katwa - I Burdwan Division MERA PIPE WATER SUPPLY SCHEME , SM/15575 New Material Requisition To Resource Division RTOR000066/2022-2023 1261/BWD 17/03/2023 Resource Division 7.73 0.00 0 0
1237 PURBA BARDHAMAN Katwa - I Burdwan Division MERA PIPE WATER SUPPLY SCHEME , SM/15575 New Material Requisition To Resource Division RTOR000109/2022-2023 1642/BWD 06/04/2023 Resource Division 1.83 0.00 0 0
1238 PURBA BARDHAMAN Katwa - I Burdwan Division MERA PIPE WATER SUPPLY SCHEME , SM/15575 New Material Requisition To Resource Division RTOR000621/2023-2024 4879/BWD 10/11/2023 Resource Division 31.56 0.00 0 0
1239 PURBA BARDHAMAN Katwa - I Central Mechanical MERA PIPE WATER SUPPLY SCHEME , SM/15575 New New Service connection for Mera PWSS TW-1 BILL/02351/2023-2024 BP-2023-24-462 30/01/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 2.98 0.00 0 0
1240 PURBA BARDHAMAN Katwa - I Central Mechanical MERA PIPE WATER SUPPLY SCHEME , SM/15575 New New service connection for MERA PWSS TW 2. BILL/02446/2023-2024 BP-2023-24-525 09/02/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 5.08 0.00 0 0
1241 PURBA BARDHAMAN Katwa - I Burdwan Division MERA PIPE WATER SUPPLY SCHEME , SM/15575 New Supply of one no. Diesel / LPG / CNG driven Motor Cab / Maxi Cab (Air Condition) on hire basis for the office of the Executive Engineer, Burdwan Division, P.H.E. Dte. [Period from 01.02.2024 to 31.03.2024] AE(HQs) J.E. 1 BURDWAN ORD/001205/2023-2024 43/AE/HQ 29/01/2024 60 MD HASIN 0.80 0.00 0 0
1242 PURBA BARDHAMAN Katwa - I Burdwan Division MERA PIPE WATER SUPPLY SCHEME , SM/15575 New Continuation work for Supply of one no. Diesel / LPG / CNG driven Motor Cab / Maxi Cab (Air Condition) on hire basis for the office of the Executive Engineer, Burdwan Division, P.H.E. Dte. [Period from 01.04.2024 to 31.05.2024] AE(HQs) J.E. 1 BURDWAN ORD/001231/2023-2024 236/AE/HQ 28/03/2024 60 MD HASIN 0.80 0.00 0 0
1243 PURBA BARDHAMAN Katwa - I Central Mechanical MERA PIPE WATER SUPPLY SCHEME , SM/15575 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Jajigram & others water supply scheme under Katwa-I Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman Driller In-Charge Junior Engineer ORD/000069/2024-2025 2399/CMD 02/08/2024 90 SUBRATA BHADRA 55.16 0.00 0 0
1244 PURBA BARDHAMAN Katwa - I Burdwan Division MERA PIPE WATER SUPPLY SCHEME , SM/15575 New Continuation work for Supply of one no. Diesel / LPG / CNG driven Motor Cab / Maxi Cab (Air Condition) on hire basis for the office of the Executive Engineer, Burdwan Division, P.H.E. Dte. [Period from 01.06.2024 to 31.07.2024] AE(HQs) J.E. 1 BURDWAN ORD/000442/2024-2025 306/AE/HQ 31/05/2024 60 MD HASIN 0.80 0.00 0 0
1245 PURBA BARDHAMAN Katwa - I Burdwan Division MERA PIPE WATER SUPPLY SCHEME , SM/15575 New MERA Piped Water Supply Scheme with sinking of Tube-well, LDS, Rising Main, FHTC, Construction of 200 cum capacity RCC OHR with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drain and internal pathway at different TW site under KATWA -I Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer Junior Engineer, R.W.S., Katwa-I Dev. Block ORD/000752/2022-2023 1209/BWD 15/03/2023 365 NABIN DEBNATH 303.82 0.00 0 55
1246 PURBA BARDHAMAN Katwa - I Burdwan Division MERA PIPE WATER SUPPLY SCHEME , SM/15575 New Continuation work for Supply of one no. Diesel / LPG / CNG driven Motor Cab / Maxi Cab (Air Condition) on hire basis for the office of the Executive Engineer, Burdwan Division, P.H.E. Dte. [Period from 01.08.2024 to 30.09.2024] AE(HQs) Contractual Junior Engineer ORD/000507/2024-2025 547/AE/HQ 01/08/2024 60 MD HASIN 0.80 0.74 92.5 0
1247 PURBA BARDHAMAN Katwa - I Central Mechanical MERA PIPE WATER SUPPLY SCHEME , SM/15575 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at MERA Water Supply Scheme [ Block- KATWA-I ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. Driller In-Charge Junior Engineer ORD/000886/2023-2024 4149/CMD 29/08/2023 30 GOENKA ENTERPRISE 26.98 0.00 0 91
1248 PURBA BARDHAMAN Katwa - I Burdwan Division MERA PIPE WATER SUPPLY SCHEME , SM/15575 New Different work for MERA PWSS (Mustafapur, Arangabad and Mera mouza) plinth protection for pump house & OHR under MERA PWSS, at Katwa -I Block under Katwa Sub-Division under Burdwan Division PHE Dte. Assistant Engineer ORD/000964/2024-2025 4374/BWD 13/12/2024 90 J.K. CORPORATION 51.30 0.00 0 0
1249 PURBA BARDHAMAN Katwa - I Burdwan Division MERA PIPE WATER SUPPLY SCHEME , SM/15575 New Continuation work for Supply of one no. Diesel / LPG / CNG driven Motor Cab / Maxi Cab (Air Condition) on hire basis for the office of the Executive Engineer, Burdwan Division, P.H.E. Dte. [Period from 01.10.2024 to 30.11.2024] AE(HQs) Contractual Junior Engineer ORD/000707/2024-2025 802/AE/HQ 30/09/2024 60 MD HASIN 0.80 0.63 78.75 0
1250 PURBA BARDHAMAN Katwa - I Burdwan Division MERA PIPE WATER SUPPLY SCHEME , SM/15575 New Continuation work for Supply of one no. Diesel / LPG / CNG driven Motor Cab / Maxi Cab (Air Condition) on hire basis for the office of the Executive Engineer, Burdwan Division, P.H.E. Dte. [Period from 01.02.2025 to 31.03.2025] Contractual Junior Engineer ORD/001154/2024-2025 186/AE/HQ 31/01/2025 60 MD HASIN 0.80 0.00 0 0
1251 PURBA BARDHAMAN Katwa - I Burdwan Division MERA PIPE WATER SUPPLY SCHEME , SM/15575 New Continuation work for Supply of one no. Diesel / LPG / CNG driven Motor Cab / Maxi Cab (Air Condition) on hire basis for the office of the Executive Engineer, Burdwan Division, P.H.E. Dte. [Period from 01.12.2024 to 31.01.2025] AE(HQs) Contractual Junior Engineer ORD/000897/2024-2025 1010/AE/HQ 29/11/2024 60 MD HASIN 0.80 0.00 0 0
1252 PURBA BARDHAMAN Katwa - I Burdwan Division MERA PIPE WATER SUPPLY SCHEME , SM/15575 New Continuation work for Supply of one no. Diesel / LPG / CNG driven Motor Cab / Maxi Cab (Air Condition) on hire basis for the office of the Executive Engineer, Burdwan Division, P.H.E. Dte. [Period from 01.04.2025 to 31.05.2025] Contractual Junior Engineer ORD/001405/2024-2025 457/AE/HQ 28/03/2025 60 MD HASIN 0.80 0.00 0 0
1253 PURBA BARDHAMAN Purbasthali - I Burdwan Division SAHAPUR PIPED WATER SUPPLY SCHEME , SM/14969 New Material Requisition To Resource Division RTOR000279/2023-2024 2197/BWD 12/05/2023 Resource Division 18.45 0.00 0 0
1254 PURBA BARDHAMAN Purbasthali - I Burdwan Division SAHAPUR PIPED WATER SUPPLY SCHEME , SM/14969 New Material Requisition To Resource Division RTOR000510/2023-2024 4034/BWD 08/09/2023 Resource Division 3.06 0.00 0 0
1255 PURBA BARDHAMAN Purbasthali - I Central Mechanical SAHAPUR PIPED WATER SUPPLY SCHEME , SM/14969 New New service connection charges for Sahapur PWSS TW-2 BILL/01831/2023-2024 BP-2023-24-337 06/01/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 12.21 0.00 0 0
1256 PURBA BARDHAMAN Purbasthali - I Burdwan Division SAHAPUR PIPED WATER SUPPLY SCHEME , SM/14969 New Material Requisition To Resource Division RTOR000808/2023-2024 299/BWD 24/01/2024 Resource Division 14.63 0.00 0 0
1257 PURBA BARDHAMAN Purbasthali - I Central Mechanical SAHAPUR PIPED WATER SUPPLY SCHEME , SM/14969 New New service connection for Sahapur PWSS. BILL/02249/2023-2024 BP-2023-24-389 17/01/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 4.86 0.00 0 0
1258 PURBA BARDHAMAN Purbasthali - I Central Mechanical SAHAPUR PIPED WATER SUPPLY SCHEME , SM/14969 New Additional Quotation for new service connection for Sahapur PWSS, PH-1. BILL/00311/2024-2025 BP-2024-25-152 21/06/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 1.86 0.00 0 0
1259 PURBA BARDHAMAN Purbasthali - I Central Mechanical SAHAPUR PIPED WATER SUPPLY SCHEME , SM/14969 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Haripur & others water supply scheme under purbasthali 1 Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000072/2024-2025 2397/CMD 02/08/2024 90 CHATTERJEE ENTERPRISE 48.60 0.00 0 0
1260 PURBA BARDHAMAN Purbasthali - I Central Mechanical SAHAPUR PIPED WATER SUPPLY SCHEME , SM/14969 New Supply & Installation of Submersible Pumping Machinery , Voltage Stabilizer, Chlorination system and internal House wiring for Tube well no.- 1 & 2 at SAHAPUR Water Supply Scheme [Block - PURBASTHALI-1] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER Junior Engineer ORD/000036/2023-2024 2473/CMD 30/05/2023 30 MAA KALI ENTERPRISE 20.80 0.00 0 90
1261 PURBA BARDHAMAN Purbasthali - I Burdwan Division SAHAPUR PIPED WATER SUPPLY SCHEME , SM/14969 New Different works related (sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of different capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site) to NAMA BHANDARITURI, SAHAPUR & MOUDANGA Piped Water Supply Scheme under PURBASTHALI-I Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000511/2023-2024 3689/BWD 23/08/2023 770 THE MAHADEV CONSTRUCTION 734.18 0.00 0 50
1262 PURBA BARDHAMAN Ausgram - II Burdwan Division SUATA PIPED WATER SUPPLY SCHEME , SM/14974 New Material Requisition To Resource Division RTOR000058/2023-2024 1962/BWD 25/04/2023 Resource Division 46.65 0.00 0 0
1263 PURBA BARDHAMAN Ausgram - II Burdwan Division SUATA PIPED WATER SUPPLY SCHEME , SM/14974 New Material Requisition To Resource Division RTOR000326/2023-2024 2197/BWD 12/05/2023 Resource Division 13.13 0.00 0 0
1264 PURBA BARDHAMAN Ausgram - II Burdwan Division SUATA PIPED WATER SUPPLY SCHEME , SM/14974 New Material Requisition To Resource Division RTOR000620/2023-2024 4887/BWD 10/11/2023 Resource Division 30.36 0.00 0 0
1265 PURBA BARDHAMAN Ausgram - II Central Mechanical SUATA PIPED WATER SUPPLY SCHEME , SM/14974 New New service connection charges for Suata PWSS TW-2 BILL/01701/2023-2024 BP-2023-24-233 20/11/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 9.29 0.00 0 0
1266 PURBA BARDHAMAN Ausgram - II Central Mechanical SUATA PIPED WATER SUPPLY SCHEME , SM/14974 New Quotation for new service connection at Suata W/S Scheme for PH No-1. BILL/01821/2023-2024 BP-2023-24-331 03/01/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.43 0.00 0 0
1267 PURBA BARDHAMAN Ausgram - II Central Mechanical SUATA PIPED WATER SUPPLY SCHEME , SM/14974 New QUOTATION FOR NEW SERVICE CONNECTION FOR SUATA (ADDL TW)PWSS, TW 2 BILL/00328/2024-2025 BP-2024-25-162 01/07/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.68 0.00 0 0
1268 PURBA BARDHAMAN Ausgram - II Central Mechanical SUATA PIPED WATER SUPPLY SCHEME , SM/14974 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at Suata Water Supply Scheme [ Block- Ausgram-2 ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. Driller In-Charge JUNIOR ENGINEER ORD/000748/2023-2024 4058/CMD 29/08/2023 30 DEY ENTERPRISE 27.79 0.00 0 96
1269 PURBA BARDHAMAN Ausgram - II Central Mechanical SUATA PIPED WATER SUPPLY SCHEME , SM/14974 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Chora, Kalaijhuti & others water supply scheme under Ausgram-2 Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. Driller In-Charge JUNIOR ENGINEER ORD/000143/2024-2025 2405/CMD 02/08/2024 90 NABAUDYOG ELECTRICAL ENGINEERING CO-OPERATIVE SOCIETY LTD 95.26 0.00 0 0
1270 PURBA BARDHAMAN Ausgram - II Durgapur W/S Division SUATA PIPED WATER SUPPLY SCHEME , SM/14974 New Acceptance cum Formal Work Order for Balance works of 160 mm dia HDPE rising main at JOYRAMPUR area and etc. allied works at SUATA of Ausgram -II Block of SUATA W/S Scheme (JJM) under Durgapur Water Supply Division, PHE Dte. Assistant Engineer-II JUNIOR ENGINEER-1 ORD/000099/2024-2025 1012/DWSD 16/07/2024 90 SAIKAT RAY 67.88 0.00 0 100
1271 PURBA BARDHAMAN Ausgram - II Durgapur W/S Division SUATA PIPED WATER SUPPLY SCHEME , SM/14974 New Acceptance cum Formal Work Order for the work of " Balance work for sinking of 250 x 150mm dia T/W, P/H, Boundary wall, DI RM and LLDS for proposed 3rd T/W and other allied works under Sauta PWSS, Block- Aushgram-II, Dist-Purba Bardhaman under Durgapur W/S Division, PHE Dte. Assistant Engineer-I,Assistant Engineer-II JUNIOR ENGINEER-1 ORD/000001/2024-2025 768/DWSD 06/06/2024 45 SAIKAT RAY 94.93 0.00 0 70
1272 PURBA BARDHAMAN Ausgram - II Durgapur W/S Division SUATA PIPED WATER SUPPLY SCHEME , SM/14974 New Material Requisition To Resource Division RTOR000010/2024-2025 1724/I/DWSD 10/12/2024 Resource Division 2.16 0.00 0 0
1273 PURBA BARDHAMAN Ausgram - II Central Mechanical SUATA PIPED WATER SUPPLY SCHEME , SM/14974 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-3 at SUATA Water Supply Scheme [ BLOCK- AUSGRAM-II ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. Driller In-Charge JUNIOR ENGINEER ORD/000558/2024-2025 3090/CMD 10/12/2024 172 SWAPAN BANERJEE 12.79 0.00 0 90
1274 PURBA BARDHAMAN Ausgram - II Durgapur W/S Division SUATA PIPED WATER SUPPLY SCHEME , SM/14974 New Acceptance cum Formal Work Order for Balance Work for Suata PWSS with LDS,FHTC Under Ausgram- II Block, Diastrict- Purba Bardhaman under Durgapur W/S Division, PHE Dte. Assistant Engineer-II JUNIOR ENGINEER-1,Junior Engineer_3 ORD/000181/2024-2025 1618/DWSD 26/11/2024 90 SAIKAT RAY 28.00 0.00 0 100
1275 PURBA BARDHAMAN Ausgram - II Burdwan Division SUATA PIPED WATER SUPPLY SCHEME , SM/14974 New SUATA Piped Water Supply Scheme with sinking of Tube-well, LDS,Rising Main, FHTC, Construction of 400 cum capacity RCC OHR with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drain and internal pathway at different TW site under Aushgram-II Block, District:- Purba-Bardhaman [NEW SCHEME] ORD/000494/2023-2024 3524/BWD 10/08/2023 629 SAIKAT RAY 615.97 160.71 26.09 45
1276 PURBA BARDHAMAN Burdwan - II Burdwan Division PROCUREMENT OF LAND OF NANDRA PIPED WATER SUPPLY SCHEME BURDWAN-II BLOCK DIST PURBA BARDHAMAN VIDE G O NO PHE/2061//IL/48/19 DATED 01/09/2021 OF THE DEPUTY SECRETARY TECHNICAL TO THE GOVERNMENT OF WEST BENGAL ADMIN. APPRO.NO. PHE/IV/1823/W-27/2013 DATED 2 , SM/14187 New PROCUREMENT OF LAND OF NANDRA PIPED WATER SUPPLY SCHEME BURDWAN-II BLOCK DIST PURBA BARDHAMAN VIDE G O NO PHE/2061//IL/48/19 DATED 01/09/2021 OF THE DEPUTY SECRETARY TECHNICAL TO THE GOVERNMENT OF WEST BENGAL ADMIN. APPRO.NO. PHE/IV/1823/W-27/2013 DATED 28/03/2013 BILL/00429/2024-2025 1029/LAND 25/10/2024 PURBA BARDHAMAN ZILLA PARISHAD 6.98 0.00 0 0
1277 PURBA BARDHAMAN Burdwan Division RETROFITTING OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR TEANDUL , SM/16489 Retrofitting Construction of Boundary wall at Head Works Site of TEANDUL Water Supply Scheme under RAINA I Block of Burdwan Division, PHE Dte. (Length -151.00 Mtr, Col - 48 Nos). Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000012/2023-2024 1727/BWD 13/04/2023 60 HI-LIGHT ELECTRONICS 21.94 0.00 0 100
1278 PURBA BARDHAMAN Burdwan Division RETROFITTING OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR TEANDUL , SM/16489 Retrofitting Construction of Path Way, Drain, Repairing of Pump House at 2nd TW Site and Providing leftout FHTC, Road Restoration with allied work for TENDUL Piped Water Supply Scheme, Block- Raina-I, within Burdwan Sub Division under Burdwan Division PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000965/2024-2025 4375/BWD 13/12/2024 90 DEY NIRMAN 12.69 0.00 0 0
1279 PURBA BARDHAMAN Burdwan Division RETROFITTING OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR TEANDUL , SM/16489 Retrofitting Laying of Parallel Pipeline from Distribution line near Head Work site to Sonadanga to improve water demand at Madubon, Sultanbad & Dhomas village by direct water supply of TENDUL Piped Water Supply Scheme, Raina-I Block under Burdwan Sub Division under Burdwan Division PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/001110/2023-2024 1117/BWD 14/03/2024 124 ANWESHA CONSTRUCTION 11.70 0.00 0 100
1280 PURBA BARDHAMAN Ketugram - I Burdwan Division MALGRAM PIPED WATER SUPPLY SCHEME , SM/15150 New Material Requisition To Resource Division RTOR000008/2023-2024 1962/BWD 25/04/2023 Resource Division 1.83 0.00 0 0
1281 PURBA BARDHAMAN Ketugram - I Burdwan Division MALGRAM PIPED WATER SUPPLY SCHEME , SM/15150 New Material Requisition To Resource Division RTOR000338/2023-2024 2197/BWD 12/05/2023 Resource Division 7.73 0.00 0 0
1282 PURBA BARDHAMAN Ketugram - I Burdwan Division MALGRAM PIPED WATER SUPPLY SCHEME , SM/15150 New Material Requisition To Resource Division RTOR000743/2023-2024 5259/BWD 30/11/2023 Resource Division 20.18 0.00 0 0
1283 PURBA BARDHAMAN Ketugram - I Central Mechanical MALGRAM PIPED WATER SUPPLY SCHEME , SM/15150 New Quotation for new service connection at Malgram PWSS PH-2. BILL/00418/2024-2025 BP-2024-25-225 26/07/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 4.27 0.00 0 0
1284 PURBA BARDHAMAN Ketugram - I Central Mechanical MALGRAM PIPED WATER SUPPLY SCHEME , SM/15150 New Quotation for new service connection at Malgram PWSS PH-I. BILL/00346/2024-2025 BP-2024-25-168 01/07/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.14 0.00 0 0
1285 PURBA BARDHAMAN Ketugram - I Central Mechanical MALGRAM PIPED WATER SUPPLY SCHEME , SM/15150 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Rajur & others water supply scheme under Ketugram-I Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. Driller In-Charge Junior Engineer ORD/000098/2024-2025 2407/CMD 02/08/2024 90 M.S. ENTERPRISE 82.29 0.00 0 0
1286 PURBA BARDHAMAN Ketugram - I Burdwan Division MALGRAM PIPED WATER SUPPLY SCHEME , SM/15150 New Balance work for OHR, extension of pipeline to provide FHTC with sinking of tube well, construction of pump house, boundary wall, land development, plinth protection for pump house, approach road & other related work under Murgram, Moregram, Malgram, Khanji, PWSS under Katwa Sub Division, Block- Ketugram-I, Burdwan Division PHE Dte. Assistant Engineer JUNIOR ENGINEER R.W.S. BURDWAN SUB-DIVISION PHE DTE ORD/000289/2024-2025 2739/BWD 12/07/2024 120 PUSPA ENTERPRISE 185.75 0.00 0 72
1287 PURBA BARDHAMAN Ketugram - I Burdwan Division MALGRAM PIPED WATER SUPPLY SCHEME , SM/15150 New Material Requisition To Resource Division RTOR000016/2024-2025 4108/BWD 25/11/2024 Resource Division 4.93 0.00 0 0
1288 PURBA BARDHAMAN Ketugram - I Burdwan Division MALGRAM PIPED WATER SUPPLY SCHEME , SM/15150 New Different works related (sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of different capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site) to MALGRAM, MURGRAM, MORGRAM & KHANJI Piped Water Supply Scheme under KETUGRAM -I Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer JUNIOR ENGINEER R.W.S. BURDWAN SUB-DIVISION PHE DTE ORD/000435/2023-2024 3387/BWD 03/08/2023 365 PUSPA ENTERPRISE 1,333.98 24.94 1.87 40
1289 PURBA BARDHAMAN Ketugram - I Central Mechanical MALGRAM PIPED WATER SUPPLY SCHEME , SM/15150 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at MALGRAM Water Supply Scheme [ Block- KETUGRAM-1] under CMD, PHE Dte., Dist.- Purba-Bardhaman. Driller In-Charge Junior Engineer ORD/000865/2023-2024 4120/CMD 29/08/2023 550 ANANTA ELECTRICAL ENGINEERING CONSTRUCTION 27.75 0.00 0 82
1290 PURBA BARDHAMAN Katwa - I Burdwan Division JAJIGRAM PIPE WATER SUPPLY SCHEME , SM/15151 New Material Requisition To Resource Division RTOR000149/2023-2024 2155/BWD 10/05/2023 Resource Division 13.59 0.00 0 0
1291 PURBA BARDHAMAN Katwa - I Burdwan Division JAJIGRAM PIPE WATER SUPPLY SCHEME , SM/15151 New Material Requisition To Resource Division RTOR000492/2023-2024 4016/BWD 08/09/2023 Resource Division 0.97 0.00 0 0
1292 PURBA BARDHAMAN Katwa - I Central Mechanical JAJIGRAM PIPE WATER SUPPLY SCHEME , SM/15151 New New service connection charges for Jajigram PWSS TW-1 BILL/01476/2023-2024 BP-2023-24-174 29/09/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 5.42 0.00 0 0
1293 PURBA BARDHAMAN Katwa - I Central Mechanical JAJIGRAM PIPE WATER SUPPLY SCHEME , SM/15151 New New service connection charges for Jajigram PWSS TW-2 BILL/01539/2023-2024 BP-2023-24-206 30/10/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.31 0.00 0 0
1294 PURBA BARDHAMAN Katwa - I Burdwan Division JAJIGRAM PIPE WATER SUPPLY SCHEME , SM/15151 New Material Requisition To Resource Division RTOR000631/2023-2024 4883/BWD 10/11/2023 Resource Division 28.85 0.00 0 0
1295 PURBA BARDHAMAN Katwa - I Central Mechanical JAJIGRAM PIPE WATER SUPPLY SCHEME , SM/15151 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Jajigram & others water supply scheme under Katwa-I Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman Driller In-Charge Junior Engineer ORD/000069/2024-2025 2399/CMD 02/08/2024 90 SUBRATA BHADRA 55.16 0.00 0 0
1296 PURBA BARDHAMAN Katwa - I Burdwan Division JAJIGRAM PIPE WATER SUPPLY SCHEME , SM/15151 New Balance work for Balance work of OHR, construction Concrete Road, 1st Floor of Office Building, Functional Household Tap Connection, land development, Road restoration etc. of Gopekhanji, Jajigram & Gidhagram PWSS under KATWA -I Block, under Katwa Sub Division under Burdwan Divn, District:- Purba-Bardhaman. Assistant Engineer ORD/000503/2024-2025 3161/BWD 22/08/2024 120 POWER TOOLS & ENGINEERING 272.54 0.00 0 0
1297 PURBA BARDHAMAN Katwa - I Burdwan Division JAJIGRAM PIPE WATER SUPPLY SCHEME , SM/15151 New JAJIGRAM Piped Water Supply Scheme with sinking of Tube-well, LDS, Rising Main, FHTC, Construction of 250 cum capacity RCC OHR with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drain and internal pathway at different TW site under KATWA -I Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer JUNIOR ENGINEER KATWA SUB-DIVISION PHE DTE ORD/000742/2022-2023 1135/BWD 13/03/2023 365 POWER TOOLS & ENGINEERING 368.83 81.78 22.17 75
1298 PURBA BARDHAMAN Katwa - I Central Mechanical JAJIGRAM PIPE WATER SUPPLY SCHEME , SM/15151 New Supply and installation of Electro-Magnetic flow meter at AURIA, KARUI & others water supply scheme under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. Driller In-Charge JUNIOR ENGINEER ORD/000602/2024-2025 3106/CMD 11/12/2024 60 S.K. ELECTRICALS 13.60 0.00 0 0
1299 PURBA BARDHAMAN Katwa - I Burdwan Division JAJIGRAM PIPE WATER SUPPLY SCHEME , SM/15151 New Balance work for the construction of office cum Go-Down at ground floor at the head work site of JAJIGRAM PWSS under Katwa I Block under Katwa Sub-Division under Burdwan Division, PHE. Dte. Assistant Engineer ORD/001025/2024-2025 106/BWD 07/01/2025 60 SUBODH KUMAR MONDAL 9.11 0.00 0 0
1300 PURBA BARDHAMAN Katwa - I Central Mechanical JAJIGRAM PIPE WATER SUPPLY SCHEME , SM/15151 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at JAJIGRAM Water Supply Scheme [ Block- KATWA-1] under CMD, PHE Dte., Dist.- Purba-Bardhaman. Driller In-Charge Junior Engineer ORD/000853/2023-2024 4123/CMD 29/08/2023 415 M/S, N.G. ENTERPRISES. 26.94 0.00 0 92
1301 PURBA BARDHAMAN Katwa - I Burdwan Division JAJIGRAM PIPE WATER SUPPLY SCHEME , SM/15151 New Construction of Office Cum Godown at Head work site of JAJIGRAM PWSS under Katwa Sub Division, within Burdwan Division PHE Dte. Assistant Engineer Junior Engineer, R.W.S., Katwa-I Dev. Block ORD/000854/2023-2024 5201/BWD 29/11/2023 180 SUBODH KUMAR MONDAL 37.69 8.09 21.46 10
1302 PURBA BARDHAMAN Burdwan Division AUGUMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR ALIPUR , SM/15191 Augmentation Preparation and Submission of DPR for Augmentation of Alipore PWSS under Memari-I Development Block under Burdwan Division, P.H.E Dte.[2nd Call] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000394/2023-2024 1582/BSD 24/07/2023 15 MEASURE LAND 0.78 0.77 98.72 100
1303 PURBA BARDHAMAN Burdwan Division AUGUMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR ALIPUR , SM/15191 Augmentation Sinking of 300 X 200mm dia Tube Well 150 mtr. Depth by D.R. Rig method using UPVC pipe (CD) and UPVC Deep Well Screen (RDS) for SASINARA Z-II W/S Scheme at Kalsi Mouza, RASULPUR W/S Scheme at 4th TW site & ALIPUR W/S Scheme at 4th TW site under Memari-I Block under within Burdwan Sub-Division, PHE Dte. [For 3 Nos. Tube well]. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000159/2023-2024 2455/BWD 31/05/2023 60 SUSUNIA GP CO. OPERATIVE LABOUR CONTRACT AND CONSTRUCTION SOCIETY LTD. 39.76 0.00 0 100
1304 PURBA BARDHAMAN Central Mechanical AUGUMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR ALIPUR , SM/15191 Augmentation Quotation for new electric service connection at Alipur PH NO.-3 BILL/01756/2023-2024 BP-2023-24-266 11/12/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.78 0.00 0 0
1305 PURBA BARDHAMAN Burdwan Division AUGUMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR ALIPUR , SM/15191 Augmentation Construction of switch rooms & Rising main at different TW site for ALIPUR Piped Water Supply Scheme under Memari - I Block, District:- Purba-Bardhaman under Burdwan Division, PHE. Dte. ORD/000666/2023-2024 4162/BWD 20/09/2023 60 M/S PALASH BISWAS 8.12 0.00 0 100
1306 PURBA BARDHAMAN Burdwan Division AUGUMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR ALIPUR , SM/15191 Augmentation Construction of boundary wall and Soak Well at Head Works Site, Extension of Pipe Line at Alipur Adibasipara and Installation of water level indicator of ALIPUR Water Supply Scheme under MEMARI-I Block of Burdwan Division, PHE Dte. (Length -230.00 Mtr, Col-85 Nos). Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. Junior Engineer, RWS, Memari-I Dev. Bolck ORD/000180/2024-2025 2300/BWD 20/06/2024 120 ROHAN MONDAL 31.47 2.15 6.83 17
1307 PURBA BARDHAMAN Central Mechanical AUGUMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR ALIPUR , SM/15191 Augmentation Supply & Installation of Submersible Pumping Machinery , Voltage Stabilizer, Chlorination system and internal House wiring for Tube well no.- 1&2 at Augumentation of Alipur Water Supply Scheme under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER Junior Engineer ORD/000088/2023-2024 2593/CMD 07/06/2023 30 SOUNAK ENTERPRISE 22.73 0.00 0 50
1308 PURBA BARDHAMAN Central Mechanical AUGUMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR ALIPUR , SM/15191 Augmentation Supply and installation of Electro-Magnetic flow meter at HARIGRAM, KUCHUT & others water supply scheme under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. ASSISTANT ENGINEER Junior Engineer ORD/000564/2024-2025 3103/CMD 11/12/2024 60 S DUTTA 15.06 0.00 0 0
1309 PURBA BARDHAMAN Burdwan Division AUGUMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR ALIPUR , SM/15191 Augmentation Replacing damaged PVC water supply line and re installation of FHTC at Shyamnagar for Alipur and its Adjoining Mouza W/S Scheme, block -Memari-I within Burdwan Sub-Division ,PHE Dte Junior Engineer, RWS, Memari-I Dev. Bolck ORD/001085/2024-2025 114/BSD 16/01/2025 30 MUKHERJEE ENTERPRISE 2.44 0.00 0 0
1310 PURBA BARDHAMAN Central Mechanical AUGUMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR ALIPUR , SM/15191 Augmentation Illumination arrangement & different electro-mechanical works at ALIPUR water supply scheme under Memari-I Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. ASSISTANT ENGINEER Junior Engineer ORD/000413/2024-2025 2794/CMD 01/10/2024 92 S DUTTA 12.53 12.20 97.37 100
1311 PURBA BARDHAMAN Burdwan Division AUGUMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR ALIPUR , SM/15191 Augmentation Restoration of concrete road by Cement concrete (mix 1:1.5:3), Providing balance FHTC, parallel pipeline, drainage system, boundary wall, Bridge, land development, Sluice valve chamber for smooth water supply of FHTC work for ALIPUR PWSS and its adjoining mouzas within MEMARI-I BLOCK under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/001095/2024-2025 430/BWD 20/01/2025 90 DULAL MAJUMDER 117.26 0.00 0 0
1312 PURBA BARDHAMAN Burdwan Division AUGUMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR ALIPUR , SM/15191 Augmentation Providing Balance Functional Household Tap Connection (800 Nos. FHTC) from existing distribution system within the command area of ALIPUR Piped Water Supply scheme at ALIPUR, AMADPUR (PART) mouza, Construction of boundary wall at 4th T/W site MEMARI-I Block of Burdwan Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000319/2024-2025 2855/BWD 22/07/2024 244 MUKHERJEE ENTERPRISE 84.14 0.00 0 30
1313 PURBA BARDHAMAN Ketugram - II Burdwan Division CHAR SUJAPUR PIPED WATER SUPPLY SCHEME , SM/15165 New Material Requisition To Resource Division RTOR000016/2023-2024 1962/BWD 25/04/2023 Resource Division 1.28 0.00 0 0
1314 PURBA BARDHAMAN Ketugram - II Burdwan Division CHAR SUJAPUR PIPED WATER SUPPLY SCHEME , SM/15165 New Material Requisition To Resource Division RTOR000299/2023-2024 2197/BWD 12/05/2023 Resource Division 9.58 0.00 0 0
1315 PURBA BARDHAMAN Ketugram - II Burdwan Division CHAR SUJAPUR PIPED WATER SUPPLY SCHEME , SM/15165 New Material Requisition To Resource Division RTOR000746/2023-2024 5254/BWD 30/11/2023 Resource Division 20.18 0.00 0 0
1316 PURBA BARDHAMAN Ketugram - II Central Mechanical CHAR SUJAPUR PIPED WATER SUPPLY SCHEME , SM/15165 New New service connection for Char Sujapur PWSS PH-1. BILL/02288/2023-2024 BP-2023-24-414 19/01/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 4.99 0.00 0 0
1317 PURBA BARDHAMAN Ketugram - II Central Mechanical CHAR SUJAPUR PIPED WATER SUPPLY SCHEME , SM/15165 New New service connection for Char Sujapur PWSS PH-2. BILL/02289/2023-2024 BP-2023-24-415 19/01/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.27 0.00 0 0
1318 PURBA BARDHAMAN Ketugram - II Central Mechanical CHAR SUJAPUR PIPED WATER SUPPLY SCHEME , SM/15165 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Kankurhati & others water supply scheme under Ketugram-2 Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. Driller In-Charge Junior Engineer ORD/000103/2024-2025 2408/CMD 02/08/2024 90 DIPALI CONSTRUCTION 41.95 0.00 0 0
1319 PURBA BARDHAMAN Ketugram - II Burdwan Division CHAR SUJAPUR PIPED WATER SUPPLY SCHEME , SM/15165 New CHAR SUJAPUR Piped Water Supply Scheme with sinking of Tube-well, LDS, Rising Main, FHTC, Construction of 300 cum capacity RCC OHR with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drain and internal pathway at different TW site under KETUGRAM -II Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer JUNIOR ENGINEER R.W.S. BURDWAN SUB-DIVISION PHE DTE ORD/000179/2023-2024 3032/BWD 14/07/2023 365 M/S H.R. CONSTRUCTION 471.47 151.40 32.11 91
1320 PURBA BARDHAMAN Ketugram - II Burdwan Division CHAR SUJAPUR PIPED WATER SUPPLY SCHEME , SM/15165 New Balance work for OHR, extension of pipeline to provide FHTC with sinking of tube well, construction of pump house, boundary wall, land development, plinth protection for pump house & OHR under Charsujapur PWSS, Block-Ketugram-II under Katwa Sub Division within Burdwan division PHE Dte. Assistant Engineer JUNIOR ENGINEER R.W.S. BURDWAN SUB-DIVISION PHE DTE ORD/000360/2024-2025 2923/BWD 26/07/2024 90 M/S H.R. CONSTRUCTION 81.31 0.00 0 0
1321 PURBA BARDHAMAN Ketugram - II Central Mechanical CHAR SUJAPUR PIPED WATER SUPPLY SCHEME , SM/15165 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at CHAR SUJAPUR Water Supply Scheme [ Block- KETUGRAM-2] under CMD, PHE Dte., Dist.- Purba-Bardhaman. Driller In-Charge Junior Engineer ORD/000866/2023-2024 4118/CMD 29/08/2023 550 M/S. S.R. ENTERPRISE 29.41 0.00 0 46
1322 PURBA BARDHAMAN Ketugram - II Burdwan Division CHAR SUJAPUR PIPED WATER SUPPLY SCHEME , SM/15165 New Material Requisition To Resource Division RTOR000044/2024-2025 324/BWD 15/01/2025 Resource Division 6.23 0.00 0 0
1323 PURBA BARDHAMAN Ketugram - II Central Mechanical CHAR SUJAPUR PIPED WATER SUPPLY SCHEME , SM/15165 New Qtn for new connection at Charsujapur T/W no-3 BILL/00060/2025-2026 null 21/04/2025 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 4.62 0.00 0 null
1324 PURBA BARDHAMAN Ketugram - I Burdwan Division KULUTIA PIPED WATER SUPPLY SCHEME , SM/15167 New Material Requisition To Resource Division RTOR000390/2023-2024 2197/BWD 12/05/2023 Resource Division 10.23 0.00 0 0
1325 PURBA BARDHAMAN Ketugram - I Burdwan Division KULUTIA PIPED WATER SUPPLY SCHEME , SM/15167 New Material Requisition To Resource Division RTOR000407/2023-2024 3825/BWD 01/09/2023 Resource Division 2.16 0.00 0 0
1326 PURBA BARDHAMAN Ketugram - I Burdwan Division KULUTIA PIPED WATER SUPPLY SCHEME , SM/15167 New Material Requisition To Resource Division RTOR000740/2023-2024 5240/BWD 30/11/2023 Resource Division 20.18 0.00 0 0
1327 PURBA BARDHAMAN Ketugram - I Central Drilling KULUTIA PIPED WATER SUPPLY SCHEME , SM/15167 New Providing drilling crew and other allied works for construction of Tube Well (250mm X200mm X 114 Mtrs. Depth) by utilising Departmental Machineries for Kulutia W/S Scheme (T/W-I & II) ,Ketugram-I Block under PurbaBardhman District, Central Drilling Division, P.H.E. Dte. Driller In Charge Junior Engineer ORD/000165/2023-2024 1349/CDD 13/09/2023 30 UNIVERSAL ENTERPRISES 16.66 0.00 0 0
1328 PURBA BARDHAMAN Ketugram - I Central Mechanical KULUTIA PIPED WATER SUPPLY SCHEME , SM/15167 New New Service connection at Kulutia PWSS TW NO. 1 BILL/02370/2023-2024 BP-2023-24-491 01/02/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 4.01 0.00 0 0
1329 PURBA BARDHAMAN Ketugram - I Central Mechanical KULUTIA PIPED WATER SUPPLY SCHEME , SM/15167 New New service connection for Kulitia PWSS PH-2. BILL/02910/2023-2024 BP-2023-24-623 07/03/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.19 0.00 0 0
1330 PURBA BARDHAMAN Ketugram - I Central Mechanical KULUTIA PIPED WATER SUPPLY SCHEME , SM/15167 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Rajur & others water supply scheme under Ketugram-I Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. Driller In-Charge Junior Engineer ORD/000098/2024-2025 2407/CMD 02/08/2024 90 M.S. ENTERPRISE 82.29 0.00 0 0
1331 PURBA BARDHAMAN Ketugram - I Burdwan Division KULUTIA PIPED WATER SUPPLY SCHEME , SM/15167 New Different works related (sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of different capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site) to AMEGERIA, ARGUN, CHINISPUR & KULUTIA Piped Water Supply Scheme under KETUGRAM -I Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer JUNIOR ENGINEER R.W.S. BURDWAN SUB-DIVISION PHE DTE ORD/000533/2023-2024 3630/BWD 21/08/2023 365 M/S GOUTAM DAS 1,421.70 3.48 0.24 75
1332 PURBA BARDHAMAN Ketugram - I Central Mechanical KULUTIA PIPED WATER SUPPLY SCHEME , SM/15167 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at KULUTIA Water Supply Scheme [ Block- KETUGRAM-1] under CMD, PHE Dte., Dist.- Purba-Bardhaman. Driller In-Charge Junior Engineer ORD/000856/2023-2024 4124/CMD 29/08/2023 610 KAMAKHYA ENTERPRISE 26.93 0.00 0 46
1333 PURBA BARDHAMAN Ketugram - I Burdwan Division KULUTIA PIPED WATER SUPPLY SCHEME , SM/15167 New Road crossing through metal / concrete road by Jack Push Method for AMEGERIA (SM/16023), ARGUN (SM/16482), CHINISPUR (SM/15170) and KULITIA (SM/15167) PWSS under Ketugram I Development Block under Katwa Sub Division within Burdwan Division, PHE. Dte. Assistant Engineer ORD/001311/2024-2025 977/BWD 13/03/2025 60 M/S GOUTAM DAS 39.22 0.00 0 0
1334 PURBA BARDHAMAN Katwa - I Burdwan Division GOPKHANJI PIPED WATER SUPPLY SCHEME , SM/15171 New Material Requisition To Resource Division RTOR000094/2022-2023 1962/BWD 25/04/2023 Resource Division 37.55 0.00 0 0
1335 PURBA BARDHAMAN Katwa - I Central Mechanical GOPKHANJI PIPED WATER SUPPLY SCHEME , SM/15171 New New service connection charges for Gopkhanji W/S Scheme TW-1 BILL/00696/2023-2024 BP-2023-24-39 27/06/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 4.65 0.00 0 0
1336 PURBA BARDHAMAN Katwa - I Central Mechanical GOPKHANJI PIPED WATER SUPPLY SCHEME , SM/15171 New New service connection charges for Gopkhanji PWSS TW-2 BILL/00822/2023-2024 BP-2023-24-100 03/08/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 2.87 0.00 0 0
1337 PURBA BARDHAMAN Katwa - I Burdwan Division GOPKHANJI PIPED WATER SUPPLY SCHEME , SM/15171 New GOPKHANJI Piped Water Supply Scheme with sinking of Tube-well, LDS, Rising Main, FHTC, Construction of 250 cum capacity RCC OHR with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drain and internal pathway at different TW site under KATWA -I Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer JUNIOR ENGINEER KATWA SUB-DIVISION PHE DTE ORD/000741/2022-2023 1134/BWD 13/03/2023 365 POWER TOOLS & ENGINEERING 482.85 140.17 29.03 74
1338 PURBA BARDHAMAN Katwa - I Central Mechanical GOPKHANJI PIPED WATER SUPPLY SCHEME , SM/15171 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at GOPKHANJI Water Supply Scheme [ Block- KATWA-1] under CMD, PHE Dte., Dist.- Purba-Bardhaman. Driller In-Charge Junior Engineer ORD/000127/2023-2024 2660/CMD 16/06/2023 30 JYOTY SOLAR POWER. 26.98 10.33 38.29 100
1339 PURBA BARDHAMAN Katwa - I Central Mechanical GOPKHANJI PIPED WATER SUPPLY SCHEME , SM/15171 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Jajigram & others water supply scheme under Katwa-I Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman Driller In-Charge Junior Engineer ORD/000069/2024-2025 2399/CMD 02/08/2024 90 SUBRATA BHADRA 55.16 0.00 0 0
1340 PURBA BARDHAMAN Katwa - I Burdwan Division GOPKHANJI PIPED WATER SUPPLY SCHEME , SM/15171 New Balance work for Balance work of OHR, construction Concrete Road, 1st Floor of Office Building, Functional Household Tap Connection, land development, Road restoration etc. of Gopekhanji, Jajigram & Gidhagram PWSS under KATWA -I Block, under Katwa Sub Division under Burdwan Divn, District:- Purba-Bardhaman. Assistant Engineer ORD/000503/2024-2025 3161/BWD 22/08/2024 120 POWER TOOLS & ENGINEERING 272.54 0.00 0 0
1341 PURBA BARDHAMAN Katwa - I Central Mechanical GOPKHANJI PIPED WATER SUPPLY SCHEME , SM/15171 New Supply and installation of Electro-Magnetic flow meter at HARIGRAM, KUCHUT & others water supply scheme under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. ASSISTANT ENGINEER Junior Engineer ORD/000564/2024-2025 3103/CMD 11/12/2024 60 S DUTTA 15.06 0.00 0 0
1342 PURBA BARDHAMAN Katwa - I Burdwan Division GOPKHANJI PIPED WATER SUPPLY SCHEME , SM/15171 New Material Requisition To Resource Division RTOR000055/2024-2025 381/BWD 17/01/2025 Resource Division 12.65 0.00 0 0
1343 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR NATU , SM/15203 Augmentation Preparation and Submission of DPR for Augmentation of Natu PWSS under Raina-I Development Block under Burdwan Division, P.H.E Dte.[2nd Call] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000398/2023-2024 1586/BSD 24/07/2023 15 GEO-SOLUTION 0.78 0.77 98.72 100
1344 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR NATU , SM/15203 Augmentation Sinking of 300 X 200mm dia Tube Well 150 mtr. Depth by D.R. Rig method using UPVC pipe (CD) and UPVC Deep Well Screen (RDS) for 3RD TW site of NATU W/S Scheme under Raina - I Block within Burdwan Sub-Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000204/2023-2024 2707/BWD 08/06/2023 30 M/S D. PALIT & CO. 13.25 5.62 42.42 100
1345 PURBA BARDHAMAN Central Mechanical AUGMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR NATU , SM/15203 Augmentation NEW SERVICE CONNECTION FOR NATU (AUGMENTATION) PWSS TW 03 BILL/00118/2024-2025 BP-2024-25-58 26/04/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 10.49 0.00 0 0
1346 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR NATU , SM/15203 Augmentation Laying Parallel Pipeline to improve drinking water supply, Construction of Boundary wall, Path Way, Drain at Head Work Site and providing leftout FHTC, Road Restoration with allied work for NATU Piped Water Supply Scheme, Block-Raina-I within Burdwan Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000373/2024-2025 2994/BWD 01/08/2024 90 ANWESHA CONSTRUCTION 55.19 0.00 0 0
1347 PURBA BARDHAMAN Central Mechanical AUGMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR NATU , SM/15203 Augmentation Supply & Installation of Submersible Pumping Machinery , Voltage Stabilizer, Chlorination system and internal House wiring for Tube well no.- 1 at Augumentation of Natu Water Supply Scheme under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000097/2023-2024 2598/CMD 07/06/2023 30 ELECTRICAL & MECHANICAL ENGINEERING CORPORATION 11.15 0.00 0 96
1348 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR NATU , SM/15203 Augmentation Construction of switch rooms & Rising main at different TW site for NATU Piped Water Supply Scheme under Raina - I Block, District:- Purba-Bardhaman under Burdwan Division, PHE. Dte Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000667/2023-2024 4164/BWD 20/09/2023 300 M/S MA TARA ENTERPRISE 8.01 5.83 72.78 100
1349 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR NATU , SM/15203 Augmentation Extension Pipeline with Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of Birupur & Siyali of NATU Piped Water Supply Scheme within Raina I Block of Burdwan Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000813/2022-2023 1576/BWD 31/03/2023 60 KALYAN CHOWDHURY 30.88 16.09 52.1 100
1350 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR NATU , SM/15203 Augmentation Extension of Pipeline for providing Functional Household Tap Connection (FHTC) at Birupur & Sudarshanpur village under NATU Piped Water Supply Scheme, Block- Raina-I within Burdwan Sub Division under Burdwan Division PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/001035/2023-2024 675/BWD 19/02/2024 30 KALYAN CHOWDHURY 7.49 0.00 0 100
1351 PURBA BARDHAMAN Burdwan Division AUGUMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR HATGOBINDAPUR , SM/15175 Augmentation Preparation and Submission of DPR for Augmentation of Hatgobindapur PWSS under Burdwan-II Development Block under Burdwan Division, P.H.E Dte.[2nd Call] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. Junior Engineer, Burdwan Sadar Sub-Division ORD/000350/2023-2024 1477/BSD 12/07/2023 15 MEASURE LAND 0.78 0.77 98.72 100
1352 PURBA BARDHAMAN Burdwan Division AUGUMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR HATGOBINDAPUR , SM/15175 Augmentation Different works related (Sinking of Tube well-4th, Rising Main, construction of Pump House cum switch room and Boundary wall for HATGOBINDAPUR Piped Water Supply Scheme under BURDWAN -II Block, District:- Purba-Bardhaman. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. Junior Engineer, Burdwan Sadar Sub-Division ORD/000280/2024-2025 2712/BWD 11/07/2024 205 DEY NIRMAN 41.51 16.15 38.91 50
1353 PURBA BARDHAMAN Burdwan Division AUGUMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR HATGOBINDAPUR , SM/15175 Augmentation Laying of interconnection between 1st & 2nd tube well to OHR for Hatgobindapur PWSS within Burdhaman-II Block under Burdwan Division, PHE Dte. Junior Engineer, Burdwan Sadar Sub-Division ORD/001065/2024-2025 103/BSD 16/01/2025 30 I.S. ENTERPRISE 3.60 0.00 0 0
1354 PURBA BARDHAMAN Burdwan Division AUGUMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR HATGOBINDAPUR , SM/15175 Augmentation WBSEDCL quotation for new service connection at Hatgobindopur w/s (Aug.) , T.W No-4 BILL/01177/2024-2025 1263/JJM 31/01/2025 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 5.03 0.00 0 null
1355 PURBA BARDHAMAN Burdwan Division AUGUMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR HATGOBINDAPUR , SM/15175 Augmentation Crossing of Bardhaman-Kalna Road near Hatgobindapur College More with 150 mm dia. pipeline through pushing of 600 mm. dia. RCC casing pipe by hydraulic jacking method for Hatgobindapur W/S. Scheme under Burdwan Division, PHE. Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/001199/2024-2025 644/BWD 17/02/2025 10 I.S. ENTERPRISE 5.57 0.00 0 0
1356 PURBA BARDHAMAN Burdwan Division AUGUMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR HATGOBINDAPUR , SM/15175 Augmentation Providing LDS in place of AC pipe line for HATGOBINDAPUR PWSS under Bardhaman-II Block within Burdwan Div. PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/001278/2024-2025 874/BWD 06/03/2025 90 DEY NIRMAN 35.37 0.00 0 0
1357 PURBA BARDHAMAN Burdwan Division AUGUMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR HATGOBINDAPUR , SM/15175 Augmentation Construction of 300 cu.m. capacity 20 mtr staging height RCC Over Head Reservoir including Pipe connection & soil investigation under HATGOBINDAPUR Piped W/S. Scheme within Burdwan - II Block under Burdwan Division, P.H.E Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE.,ASSISTANT ENGINEER R.W.S. BURDWAN SUB-DIVISION PHE DTE Junior Engineer, Burdwan Sadar Sub-Division ORD/000014/2023-2024 1729/BWD 13/04/2023 180 GUPTA ENTERPRISE 89.36 35.25 39.45 100
1358 PURBA BARDHAMAN Central Mechanical AUGUMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR GHOSH , SM/15179 Augmentation Supply & Installation of Submersible Pumping Machinery , Voltage Stabilizer, Chlorination system and internal House wiring for Tube well no.- 1 at Augumentation of Ghosh Water Supply Scheme under CMD, PHE Dte., Dist.- Purba-Bardhaman. ORD/000100/2023-2024 2588/CMD 07/06/2023 30 SUDIPTA GHOSH 11.26 0.00 0 0
1359 PURBA BARDHAMAN Burdwan Division AUGUMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR GHOSH , SM/15179 Augmentation Sinking of 300 X 200mm dia Tube Well 150 mtr. Depth by D.R. Rig method using UPVC pipe (CD) and UPVC Deep Well Screen (RDS) for 3RD TW site of GHOSH W/S Scheme under Memari-I Block within Burdwan Sub-Division, PHE Dte. [For Bahabpur village]. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. Junior Engineer, RWS, Memari-I Dev. Bolck ORD/000200/2023-2024 2703/BWD 08/06/2023 30 DAS CONSTRUCTION 13.25 0.00 0 0
1360 PURBA BARDHAMAN Burdwan Division AUGUMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR GHOSH , SM/15179 Augmentation Construction of switch rooms & Rising main at different TW site for GHOSH Piped Water Supply Scheme under Memari - I Block, District:- Purba-Bardhaman under Burdwan Division, PHE. Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. Junior Engineer, RWS, Memari-I Dev. Bolck ORD/000865/2023-2024 5296/BWD 01/12/2023 60 TRIYA CONSTRUCTION 8.94 0.00 0 0
1361 PURBA BARDHAMAN Burdwan Division AUGUMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR GHOSH , SM/15179 Augmentation Preparation and Submission of DPR for Augmentation of GHOSH PWSS under Memari-I Development Block under Burdwan Division, P.H.E Dte.[2nd Call] ORD/000365/2023-2024 1527/BSD 17/07/2023 15 MEASURE LAND 0.78 0.00 0 0
1362 PURBA BARDHAMAN Central Mechanical AUGUMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR GHOSH , SM/15179 Augmentation Supply & Installation of voltage correcting device. LED fixture set & allied works at GHOSH Water Supply Scheme PH-II under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER Junior Engineer ORD/000148/2024-2025 1037/CMSD 26/07/2024 30 BENGAL ELECTRICAL CONSTRUCTION 3.28 0.00 0 100
1363 PURBA BARDHAMAN Burdwan Division AUGUMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR GHOSH , SM/15179 Augmentation Restoration of concrete road by Cement concrete (mix 1:1.5:3), Providing balance FHTC, parallel pipeline, drainage system, boundary wall, Bridge, land development, Sluice valve chamber for smooth water supply of FHTC work for GHOSH PWSS and its adjoining mouzas within MEMARI-I BLOCK under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/001193/2024-2025 612/BWD 11/02/2025 90 PAL CONSTRUCTION 29.22 0.00 0 0
1364 PURBA BARDHAMAN Burdwan Division AUGUMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR GHOSH , SM/15179 Augmentation Extension of pipeline & Left out FHTC Connection work for GHOSH Piped Water Supply Scheme at Bahabpur village [200 Nos], Andur [40 Nos], Tanti Gantar [80 Nos], Kabirpur [48 Nos], Total 368 Nos FHTC Work for Sajal Gram within Memari-I Block including leftout household water tap connection (FHTC) under BURDWAN Division, P.H.E Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. Junior Engineer, RWS, Memari-I Dev. Bolck ORD/001075/2023-2024 1021/BWD 07/03/2024 336 SKILLS AND FACILITY TRAINING INSTITUTE 21.53 0.00 0 99
1365 PURBA BARDHAMAN Central Mechanical AUGUMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR GHOSH , SM/15179 Augmentation Illumination arrangement & different electro-mechanical works at GHOSH water supply scheme under Memari-I Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. ASSISTANT ENGINEER Junior Engineer ORD/000415/2024-2025 2797/CMD 01/10/2024 183 PADMA ENGINEERING CO. 15.79 0.00 0 100
1366 PURBA BARDHAMAN Burdwan Division AUGUMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR GHOSH , SM/15179 Augmentation Allied work of Laying distribution system for FHTC work for GHOSH Piped Water Supply Scheme at Bahabpur mouza within MEMARI - I BLOCK under Burdwan Division, PHE Dte. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/001083/2024-2025 113/BSD 16/01/2025 45 A.R. TRADERS 4.70 0.00 0 100
1367 PURBA BARDHAMAN Burdwan Division AUGUMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR BALARAMPUR , SM/15181 Augmentation Preparation and Submission of DPR for Augmentation of Balarampur PWSS under Jamalpur Development Block under Burdwan Division, P.H.E Dte.[2nd Call] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. RWS_JAMALPUR ORD/000393/2023-2024 1528/BSD 17/07/2023 15 GEO-SOLUTION 0.78 0.77 98.72 100
1368 PURBA BARDHAMAN Burdwan Division AUGUMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR BALARAMPUR , SM/15181 Augmentation Sinking of 300 X 200mm dia Tube Well 150 mtr. Depth by D.R. Rig method using UPVC pipe (CD) and UPVC Deep Well Screen (RDS) for 3RD TW site of BALARAMPUR W/S Scheme under Jamalpur Block within Burdwan Sub-Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. RWS_JAMALPUR ORD/000202/2023-2024 2705/BWD 08/06/2023 30 TULIP ENGINEERS CO-OPERATIVE SOCIETY LTD. 13.26 12.64 95.32 100
1369 PURBA BARDHAMAN Central Mechanical AUGUMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR BALARAMPUR , SM/15181 Augmentation New service connection charges for Balarampur PWSS TW-4 BILL/02213/2023-2024 BP-2023-24-386 16/01/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 13.60 0.00 0 0
1370 PURBA BARDHAMAN Central Mechanical AUGUMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR BALARAMPUR , SM/15181 Augmentation New Service connection at BALARAMPUR PWSS TW-5. BILL/02364/2023-2024 BP-2023-24-482 31/01/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 16.19 0.00 0 0
1371 PURBA BARDHAMAN Burdwan Division AUGUMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR BALARAMPUR , SM/15181 Augmentation Extension of CIDF/DI Pipes with specials within command area of Balarampur piped W/S Scheme at Shalim Danga Sabgi Bazar,,Jamalpur Development Block under Burdwan Division,PHE Dte. [2nd Call]. ORD/000140/2023-2024 789/BSD 28/04/2023 15 GHOSH ENTERPRISE 0.32 0.16 50 100
1372 PURBA BARDHAMAN Central Mechanical AUGUMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR BALARAMPUR , SM/15181 Augmentation Procurement of electro-mechanical accessories for Balarampur Water Supply Scheme under JJM under CMD, PHE Dte. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/001020/2023-2024 531/CMSD 07/07/2023 30 M/S. S.D. CONSTRUCTION 0.58 0.00 0 100
1373 PURBA BARDHAMAN Burdwan Division AUGUMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR BALARAMPUR , SM/15181 Augmentation Construction of switch rooms & Rising main at different TW site for BALARAMPUR Piped Water Supply Scheme under Jamalpur Block, District:- Purba-Bardhaman under Burdwan Division, PHE. Dte. AE(HQs) Junior Engineer, Burdwan Division ORD/000594/2023-2024 3769/BWD 29/08/2023 60 SOUMYAVASH DAS 8.94 0.00 0 100
1374 PURBA BARDHAMAN Central Mechanical AUGUMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR BALARAMPUR , SM/15181 Augmentation Illumination arrangement and miscellaneous works at Balarampur water supply scheme under Jamalpur Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000444/2024-2025 2786/CMD 01/10/2024 60 A.K. ENTERPRISE 15.91 0.00 0 0
1375 PURBA BARDHAMAN Burdwan Division AUGUMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR BALARAMPUR , SM/15181 Augmentation Construction of Boundary wall, Land Development for various PWSS, Block- Jamalpur, District:- Purba-Bardhaman within Burdwan Sub Division under Burdwan Division PHE Dte. AE(HQs) ORD/001100/2024-2025 433/BWD 20/01/2025 120 RABINDRA NATH GORANG 132.64 0.00 0 0
1376 PURBA BARDHAMAN Burdwan Division AUGUMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR BALARAMPUR , SM/15181 Augmentation Re-Laying of HDPE Pipeline (Damaged during flood) at Shalimdanga Bazar,Balarampur PWSS under Jamalpur Dev. Block, Burdwan Division, PHE Dte. JE/RWS/JAMALPUR ORD/001206/2024-2025 263/AE/HQ 18/02/2025 30 SOUMYAVASH DAS 1.63 0.00 0 0
1377 PURBA BARDHAMAN Burdwan Division AUGUMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR BALARAMPUR , SM/15181 Augmentation Land Possession Display Board at BALARAMPUR PWSS & Other schemes (Total=82 Nos) under JAMALPUR Block. Under Burdwan Div. PHE Dte. AE(HQs) JE/RWS/JAMALPUR,Junior Engineer, Burdwan Division ORD/001295/2024-2025 352/AE/HQ 10/03/2025 30 M/S ANAND CONSTRUCTION 3.36 0.00 0 100
1378 PURBA BARDHAMAN Burdwan Division AUGUMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR BALARAMPUR , SM/15181 Augmentation Construction of boundary wall at 4Th Tubewell of BALARAMPUR PWSS at Jamalpur Block under Burdwan Division, PHE Dte. (Length -110 Mtr, Col-42 Nos). AE(HQs) Junior Engineer, Burdwan Division ORD/000932/2024-2025 4300/BWD 10/12/2024 30 MOFIZ UDDIN MOLLICK 9.09 0.00 0 100
1379 PURBA BARDHAMAN Central Mechanical AUGUMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR BALARAMPUR , SM/15181 Augmentation Supply & Installation of Submersible Pumping Machinery , Voltage Stabilizer, Chlorination system and internal House wiring for Tube well no.- 1&2 at Augumentation of Balarampur Water Supply Scheme under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000082/2023-2024 2589/CMD 07/06/2023 697 P.K. ENGINEERING 22.61 10.45 46.22 90
1380 PURBA BARDHAMAN Burdwan Division AUGUMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR BALARAMPUR , SM/15181 Augmentation Construction of (i) Pump House cum chlorine room without sanitary and water supply arrangement at 5th Tube Well Site to departmental drawing no-PHE/BD/P.H/DRG/02/ DEC-17 (Size 3.60 mtr x 3.00 mtr room), (CD) and UPVC Deep Well Screen (RDS), (ii) Interconnection between pump house & delivery line for BALARAMPUR W/S Scheme under Jamalpur Block under Burdwan Division, PHE Dte. AE(HQs) Junior Engineer, Burdwan Division ORD/001054/2023-2024 832/BWD 29/02/2024 30 SK KHAIRUL ISLAM 4.79 0.00 0 100
1381 PURBA BARDHAMAN Central Mechanical AUGMENTATION OF GROUND WATER BASED PIPED WATER SUPPLY SCHEME FOR ABUJHATI , SM/15184 Augmentation New service connection charges for Abujhati PWSS TW-4 BILL/00765/2023-2024 BP-2023-24-66 20/07/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 4.26 0.00 0 0
1382 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED PIPED WATER SUPPLY SCHEME FOR ABUJHATI , SM/15184 Augmentation Preparation and Submission of DPR for Augmentation of ABUJHATI PWSS under Jamalpur Development Block under Burdwan Division, P.H.E Dte.[2nd Call] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000364/2023-2024 1526/BSD 17/07/2023 15 MEASURE LAND 0.78 0.77 98.72 100
1383 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED PIPED WATER SUPPLY SCHEME FOR ABUJHATI , SM/15184 Augmentation Laying of HDPE Pipeline from 4th Number Pump House to main distribution system for ABUJHATI Piped W/S Scheme, Jamalpur Dev. Block under Burdwan Division, PHE Dte. ORD/000722/2023-2024 3925/BWD 05/09/2023 30 MAA BHABANI CONSTRUCTION 21.04 18.13 86.17 100
1384 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED PIPED WATER SUPPLY SCHEME FOR ABUJHATI , SM/15184 Augmentation Extension of CIDF/D.I Pipes with specials for providing FHTC at Siromoni mouza within command area of Abujhati Piped W/S Scheme Jamalpur Development Block under Burdwan Division,PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. RWS_JAMALPUR ORD/000181/2023-2024 1005/BSD 06/06/2023 15 DEBASHISH ENTERPRISE 0.94 0.00 0 100
1385 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED PIPED WATER SUPPLY SCHEME FOR ABUJHATI , SM/15184 Augmentation Laying different dia UPVC Pipeline for inter connection of existing FHTC near Raypara of Abujhati Flyover i.c.w. Road widening from 4 lane to 6 lane of NH-2 at chane 601+9521+960 under ABUIHATI PWSS in jamalpur Block within Burdwan Sub Divn. under Burdwan Division, P.H.E. Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/001173/2023-2024 532/BSD 14/03/2024 30 SOUMYAVASH DAS 0.89 0.00 0 100
1386 PURBA BARDHAMAN Central Mechanical AUGMENTATION OF GROUND WATER BASED PIPED WATER SUPPLY SCHEME FOR ABUJHATI , SM/15184 Augmentation Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination system and internal House wiring for Tube well no.- 1 at Augmentation of ABUJHATI[JAMALPUR] Water Supply Scheme under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000568/2023-2024 3902/CMD 18/08/2023 30 KUNDU CONSTRUCTION. 12.25 0.00 0 95
1387 PURBA BARDHAMAN Central Mechanical AUGMENTATION OF GROUND WATER BASED PIPED WATER SUPPLY SCHEME FOR ABUJHATI , SM/15184 Augmentation Illumination arrangement and miscelleneous works at Abujhati water supply scheme under Jamalpur Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000404/2024-2025 2783/CMD 01/10/2024 60 M/S. S.R. ENTERPRISE 19.25 0.00 0 0
1388 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED PIPED WATER SUPPLY SCHEME FOR ABUJHATI , SM/15184 Augmentation Conducting physical Household Survey at the IMIS reported village for HGJ certification and providing balance FHTC for Har Ghar Jal certification including conducting Gram Sabhas for different IMIS reported villages across the district under Burdwan Division, PHE Dte. AE(HQs),Assistant Engineer ,Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE.,Assistant Engineer, Durgapur Sub Division, P.H.E. Dte JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000428/2024-2025 3107/BWD 12/08/2024 90 TUBGRAM GRAMMYAK UNNAYAN SAMITY 309.60 0.00 0 50
1389 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED PIPED WATER SUPPLY SCHEME FOR ABUJHATI , SM/15184 Augmentation Construction of Boundary wall, Land Development and Interconnection of ABUJHATI Piped Water Supply Scheme, Block- Jamalpur, District:- Purba-Bardhaman within Burdwan Sub Division under Burdwan Division PHE Dte. [FOR 4TH. TUBE WELL SITE]. AE(HQs) ORD/001019/2024-2025 71/BWD 06/01/2025 30 ABDUL HAI 10.34 0.00 0 0
1390 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED PIPED WATER SUPPLY SCHEME FOR ABUJHATI , SM/15184 Augmentation Improvement of 300 CuM OHR (Concreting, Plastering, Primer and Painting) for Abujhati PWSS under Jamalpur Block under Burdwan Divn., PHE. Dte. AE(HQs) Junior Engineer, Burdwan Division ORD/000344/2024-2025 450/AE/HQ 24/07/2024 45 DEBASHISH ENTERPRISE 2.01 1.48 73.63 100
1391 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED PIPED WATER SUPPLY SCHEME FOR ABUJHATI , SM/15184 Augmentation Providing FHTC for 100% coverage at Napara, Astai, Panch Shimul, Dastanpur, Keotara, Siromani, Abujhati & Ajhapur Habitation (Village) for ABUJHATI Piped W/S Scheme, Jamalpur Dev. Block under Burdwan Division, PHE Dte. AE(HQs) Junior Engineer, Burdwan Division ORD/000098/2023-2024 2236/BWD 16/05/2023 688 PAL CONSTRUCTION 36.63 15.63 42.67 50
1392 PURBA BARDHAMAN Central Mechanical AUGMENTATION OF GROUND WATER BASED PIPED WATER SUPPLY SCHEME FOR ABUJHATI , SM/15184 Augmentation Wbsedcl Quotation for new service connection at Abujhati Pwss Ph-05 BILL/01671/2024-2025 null 07/03/2025 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.26 0.00 0 null
1393 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED PIPED WATER SUPPLY SCHEME FOR ABUJHATI , SM/15184 Augmentation Construction & Installation of Sluice valve & valve Chamber to control the flow of water with laying of u-PVC Pipe under Abujhati PWSS, Jamalpur Dev. Block under Burdwan Division, PHE Dte. JE/RWS/JAMALPUR ORD/001293/2024-2025 351/AE/HQ 10/03/2025 30 DEBASHISH ENTERPRISE 5.47 0.00 0 0
1394 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED PIPED WATER SUPPLY SCHEME FOR ABUJHATI , SM/15184 Augmentation Construction of overflow chamber with u-PVC pipe line for removal of excess water at Head work Site Under ABUJHATI PWSS Jamalpur Dev. Block under Burdwan Division, PHE Dte. AE(HQs) JE/RWS/JAMALPUR,Junior Engineer, Burdwan Division ORD/001037/2024-2025 88/AE/HQ 08/01/2025 30 SOUMYAVASH DAS 0.97 0.00 0 100
1395 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF RAYAN PART III (KOPIBAGAN) PIPED WATER SUPPLY SCHEME , SM/16548 Augmentation Re-Connection of existing FHTC from newly laid distribution pipe At SUKANTA PALLY for Augmentation of RAYAN (PART-III) [ KOPIBAGAN] PIPED WATER SUPPLY SCHEME , Block- Burdwan-I , within Burdwan Sub Division under Burdwan Division PHE Dte JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000128/2024-2025 1009/BSD 06/06/2024 30 SK RAJU 0.96 0.00 0 0
1396 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF RAYAN PART III (KOPIBAGAN) PIPED WATER SUPPLY SCHEME , SM/16548 Augmentation Re-Connection of existing FHTC from newly laid distribution pipe At KHA PUKUR ADIBASIPARA for Augmentation of RAYAN (PART-III) [ KOPIBAGAN] PIPED WATER SUPPLY SCHEME , Block- Burdwan-I , within Burdwan Sub Division under Burdwan Division PHE Dte. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000142/2024-2025 1030/BSD 10/06/2024 30 SK RAJU 0.96 0.00 0 0
1397 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF RAYAN PART III (KOPIBAGAN) PIPED WATER SUPPLY SCHEME , SM/16548 Augmentation Allied work for Road restoration work due to FHTC & Extension pipe line for different village and inside road of OHR side for Rayan pwss at Bardhhaman-I Development Block under Burdwan Division, PHE Dte. Junior Engineer, Burdwan Sadar Sub-Division ORD/000301/2024-2025 1273/BSD 12/07/2024 45 MAA KALI CONSTRUCTION 3.89 0.00 0 0
1398 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF RAYAN PART III (KOPIBAGAN) PIPED WATER SUPPLY SCHEME , SM/16548 Augmentation Augmentation of RAYAN (Part-III) (KOPIBAGAN) Piped Water Supply Scheme with sinking of Tube-well, LDS, Rising Main, FHTC, Construction of switch rooms & boundary walls with gates and land development, drain and internal pathway at different TW site under Burdwan -I Block, District:- Purba-Bardhaman. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000120/2023-2024 2304/BWD 19/05/2023 120 IJABUL SEKH 166.98 36.12 21.63 65
1399 PURBA BARDHAMAN Central Mechanical AUGMENTATION OF RAYAN PART III (KOPIBAGAN) PIPED WATER SUPPLY SCHEME , SM/16548 Augmentation Illumination arrangement & different electro-mechanical works at RAYAN water supply scheme under Bardhaman-I Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. ASSISTANT ENGINEER Junior Engineer ORD/000442/2024-2025 2799/CMD 01/10/2024 60 JOYGURU ENTERPRISE 6.04 0.00 0 0
1400 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF RAYAN PART III (KOPIBAGAN) PIPED WATER SUPPLY SCHEME , SM/16548 Augmentation Material Requisition To Resource Division RTOR000004/2024-2025 4100/BWD 25/11/2024 Resource Division 11.09 0.00 0 0
1401 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF RAYAN PART III (KOPIBAGAN) PIPED WATER SUPPLY SCHEME , SM/16548 Augmentation Route Survey & Preparation of DPR for RAYAN PART-III KOPIBAGAN W/S Scheme under Burdwan-I Block under Burdwan Sub- Division under Burdwan Division PHE Dte. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000849/2024-2025 2586/BSD 26/11/2024 45 APEX ENGINEERING 2.57 0.00 0 0
1402 PURBA BARDHAMAN Central Mechanical AUGMENTATION OF RAYAN PART III (KOPIBAGAN) PIPED WATER SUPPLY SCHEME , SM/16548 Augmentation Supply & Installation of Submersible Pumping Machinery , Voltage Stabilizer, Chlorination system and internal House wiring for Tube well no.- 1&2 at Augumentation of Rayan. Part -3 Kopibagan Water Supply Scheme under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER Junior Engineer ORD/000092/2023-2024 2596/CMD 07/06/2023 694 CHOUDHURY ENTERPRISE 24.13 0.00 0 50
1403 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF RAYAN PART III (KOPIBAGAN) PIPED WATER SUPPLY SCHEME , SM/16548 Augmentation Laying distribution system different damaged section regrading smooth running FHTC work for RAYAN Water Supply Scheme at Bardhaman-I Development Block under Burdwan Division,PHE Dte. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/001129/2023-2024 121/BSD 18/01/2024 30 DHIRENDRANATH SOM 0.96 0.00 0 100
1404 PURBA BARDHAMAN Kalna - II Burdwan Division PATHAR GHATA PIPED WATER SUPPLY SCHEME , SM/16029 New Material Requisition To Resource Division RTOR000086/2023-2024 1962/BWD 25/04/2023 Resource Division 32.19 0.00 0 0
1405 PURBA BARDHAMAN Kalna - II Burdwan Division PATHAR GHATA PIPED WATER SUPPLY SCHEME , SM/16029 New Material Requisition To Resource Division RTOR000368/2023-2024 2197/BWD 12/05/2023 Resource Division 4.93 0.00 0 0
1406 PURBA BARDHAMAN Kalna - II Central Mechanical PATHAR GHATA PIPED WATER SUPPLY SCHEME , SM/16029 New New electric connection for Patharghata PWSS, PH-2. BILL/01879/2023-2024 BP-2023-24-351 11/01/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 6.33 0.00 0 0
1407 PURBA BARDHAMAN Kalna - II Central Mechanical PATHAR GHATA PIPED WATER SUPPLY SCHEME , SM/16029 New New electric connection for Patharghata PWSS, PH-1. BILL/01880/2023-2024 BP-2023-24-351 11/01/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 5.41 0.00 0 0
1408 PURBA BARDHAMAN Kalna - II Burdwan Division PATHAR GHATA PIPED WATER SUPPLY SCHEME , SM/16029 New Work Order for "CONSTRUCTION OF TEMPORARY KIOSK FOR THE NECESSARY ARRANGEMENT OF ELECTRIFICATION OF TUBEWELL FOR PATHARGHATA PWSS UNDER KALNA SUB-DIVISION UNDER BURDWAN DIVISION, PHE DTE." Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/001167/2023-2024 2149/KSD 07/03/2024 10 DEL DELTA CONSTRUCTION 0.66 0.00 0 100
1409 PURBA BARDHAMAN Kalna - II Central Mechanical PATHAR GHATA PIPED WATER SUPPLY SCHEME , SM/16029 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Khargakur & others water supply scheme under Kalna-2 Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000116/2024-2025 2393/CMD 02/08/2024 280 HANNAN BUILDERS PVT LTD 76.80 0.00 0 20
1410 PURBA BARDHAMAN Kalna - II Burdwan Division PATHAR GHATA PIPED WATER SUPPLY SCHEME , SM/16029 New Work Order for "Restoration of pipeline with other allied works at different places of Akalposh, singa, kadiara, panchrakhi mouja under Patahrghata Pwss due to construction of rcc cover drain & widening of rcc concrete road constructed by PRI body under Kalna-II panchayat samiti under Kalna Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000857/2024-2025 1843/KSD 27/11/2024 15 SUPRITI ENTERPRISE 2.86 0.00 0 0
1411 PURBA BARDHAMAN Kalna - II Burdwan Division PATHAR GHATA PIPED WATER SUPPLY SCHEME , SM/16029 New Material Requisition To Resource Division RTOR000039/2024-2025 319/BWD 15/01/2025 Resource Division 5.49 0.00 0 0
1412 PURBA BARDHAMAN Kalna - II Burdwan Division PATHAR GHATA PIPED WATER SUPPLY SCHEME , SM/16029 New Different works related (sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of different capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site) to KASIPUR, PATHAR GHATA & SABIDPUR Piped Water Supply Scheme under Kalna ¿ II Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000541/2023-2024 3697/BWD 24/08/2023 770 SUPRITI ENTERPRISE 1,185.67 0.00 0 42
1413 PURBA BARDHAMAN Kalna - II Burdwan Division PATHAR GHATA PIPED WATER SUPPLY SCHEME , SM/16029 New Pipeline laying by HDD method and different types of balance works in connection with different Augmentation & New Scheme [(SM/ 08103), (SM/13413), (SM/15587), (SM/16035), (SM/16287), (SM/16029), (SM/15581), (SM/14437), (SM/16028), (SM/16036) & (SM/14425)] within Kalna Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer ORD/001270/2024-2025 849/BWD 05/03/2025 180 S.P. CONSTRUCTION 683.30 0.00 0 0
1414 PURBA BARDHAMAN Kalna - II Central Mechanical PATHAR GHATA PIPED WATER SUPPLY SCHEME , SM/16029 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at PATHAR GHATA Water Supply Scheme [ Block- KALNA-2] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER Junior Engineer ORD/000901/2023-2024 4165/CMD 29/08/2023 735 J.S. CONSTRUCTION. 28.48 0.00 0 45
1415 PURBA BARDHAMAN Ketugram - I Burdwan Division ARGUN PIPED WATER SUPPLY SCHEME , SM/16482 New Material Requisition To Resource Division RTOR000095/2023-2024 1962/BWD 25/04/2023 Resource Division 2.38 0.00 0 0
1416 PURBA BARDHAMAN Ketugram - I Burdwan Division ARGUN PIPED WATER SUPPLY SCHEME , SM/16482 New Material Requisition To Resource Division RTOR000212/2023-2024 2155/BWD 10/05/2023 Resource Division 16.15 0.00 0 0
1417 PURBA BARDHAMAN Ketugram - I Burdwan Division ARGUN PIPED WATER SUPPLY SCHEME , SM/16482 New Material Requisition To Resource Division RTOR000742/2023-2024 5253/BWD 30/11/2023 Resource Division 20.18 0.00 0 0
1418 PURBA BARDHAMAN Ketugram - I Central Drilling ARGUN PIPED WATER SUPPLY SCHEME , SM/16482 New Providing drilling crew and other allied works for construction of Tube Well (250mm X200mm X 114 Mtrs. Depth) by utilising Departmental Machineries for Argun W/S Scheme (T/W-I & II) , Ketugram-I Block under Purba Bardhman District, Central Drilling Division, P.H.E. Dte. Driller In Charge Junior Engineer ORD/000171/2023-2024 1056/CDD 16/08/2023 30 C.M. ENTERPRISE 16.20 0.00 0 0
1419 PURBA BARDHAMAN Ketugram - I Central Mechanical ARGUN PIPED WATER SUPPLY SCHEME , SM/16482 New New Service connection at Argun PWSS PH-2 BILL/02344/2023-2024 BP-2023-24-461 30/01/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 5.63 0.00 0 0
1420 PURBA BARDHAMAN Ketugram - I Central Mechanical ARGUN PIPED WATER SUPPLY SCHEME , SM/16482 New New Service connection for Argun PWSS TW-1 BILL/02349/2023-2024 BP-2023-24-460 30/01/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 4.91 0.00 0 0
1421 PURBA BARDHAMAN Ketugram - I Central Mechanical ARGUN PIPED WATER SUPPLY SCHEME , SM/16482 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Rajur & others water supply scheme under Ketugram-I Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. Driller In-Charge Junior Engineer ORD/000098/2024-2025 2407/CMD 02/08/2024 90 M.S. ENTERPRISE 82.29 0.00 0 0
1422 PURBA BARDHAMAN Ketugram - I Central Mechanical ARGUN PIPED WATER SUPPLY SCHEME , SM/16482 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at ARGUN Water Supply Scheme [ Block- KETUGRAM-1] under CMD, PHE Dte., Dist.- Purba-Bardhaman. Driller In-Charge Junior Engineer ORD/000845/2023-2024 4119/CMD 29/08/2023 30 DUTTA ENTERPRISE 26.95 0.00 0 88
1423 PURBA BARDHAMAN Ketugram - I Burdwan Division ARGUN PIPED WATER SUPPLY SCHEME , SM/16482 New Different works related (sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of different capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site) to AMEGERIA, ARGUN, CHINISPUR & KULUTIA Piped Water Supply Scheme under KETUGRAM -I Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer JUNIOR ENGINEER R.W.S. BURDWAN SUB-DIVISION PHE DTE ORD/000533/2023-2024 3630/BWD 21/08/2023 365 M/S GOUTAM DAS 1,421.70 0.00 0 75
1424 PURBA BARDHAMAN Ketugram - I Burdwan Division ARGUN PIPED WATER SUPPLY SCHEME , SM/16482 New Road crossing through metal / concrete road by Jack Push Method for AMEGERIA (SM/16023), ARGUN (SM/16482), CHINISPUR (SM/15170) and KULITIA (SM/15167) PWSS under Ketugram I Development Block under Katwa Sub Division within Burdwan Division, PHE. Dte. Assistant Engineer ORD/001311/2024-2025 977/BWD 13/03/2025 60 M/S GOUTAM DAS 39.22 0.00 0 0
1425 PURBA BARDHAMAN Ketugram - I Burdwan Division ARGUN PIPED WATER SUPPLY SCHEME , SM/16482 New Hiring of one no Diesel Motor Cab (BS-VI) including the cost of fuel . mobile & other charges for the inspection of the different projects of JJM for the office of the Assistant Engineer, Katwa Sub-Division, PHE Dte. (Period:- 01/03/2025 to 31/08/2025) [Sl No-02] ORD/001324/2024-2025 321/KTS 28/02/2025 180 HAMID SK 1.84 0.00 0 0
1426 PURBA BARDHAMAN Burdwan Division RETROFITTING OF MANIKHAR PIPED WATER SUPPLY SCHEME PART-C , SM/16289 Retrofitting Augmentation of MANIKHAR PWSS to accommodate FHTC, Laying Distribution System, Laying Rising Main, under Jal Jeevan Mission of Kalna - I Block, Purba Burdwan District under Burdwan Division, PHE. Dte. Assistant Engineer Junior Engineer, R.W.S. Burdwan Sub Division, P.H.E. Dt ORD/000157/2023-2024 2453/BWD 31/05/2023 60 SETH ENTERPRISE 34.49 17.23 49.96 100
1427 PURBA BARDHAMAN Burdwan Division RETROFITTING OF MANIKHAR PIPED WATER SUPPLY SCHEME PART-C , SM/16289 Retrofitting Work Oder for "Laying of Rising Main and alied work such as brick work, P.C.C. work and dismantling work etc. for Manikhar Piped Water Supply Scheme within Kalna Sub-Division under Burdwan Division, PHE Dte." Assistant Engineer Junior Engineer, R.W.S. Burdwan Sub Division, P.H.E. Dt ORD/000978/2023-2024 1706/KSD 01/12/2023 7 BISWAS ENTERPRISE 0.51 0.00 0 100
1428 PURBA BARDHAMAN Burdwan Division RETROFITTING OF MANIKHAR PIPED WATER SUPPLY SCHEME PART-C , SM/16289 Retrofitting Work order for 'Restoration of Concrete work and land development at Head Work Site of Manikhar PWSS under Kalna Sub-Division under Burdwan Division, PHE Dte.'. Assistant Engineer Junior Engineer, R.W.S. Burdwan Sub Division, P.H.E. Dt ORD/000807/2024-2025 1771/KSD 20/11/2024 30 BISWAS ENTERPRISE 3.26 0.00 0 100
1429 PURBA BARDHAMAN Burdwan Division RETROFITTING OF MANIKHAR PIPED WATER SUPPLY SCHEME PART-C , SM/16289 Retrofitting Arrangement of drinking water supply by installation of solar submersible pump including sinking of 200 mm. dia. Tube well 150 Mtr. Deep by direct rotary rig method, Laying dist. System, FHTC and 2 Nos. 5000 Ltr. PVC tank installation with construction of RCC structure for BHAGABATITALA Habitation which is uncovered of MANIKHAR Piped W/S. Scheme, Block KALNA-1 under Burdwan Division, PHE Dte. Assistant Engineer ORD/000018/2025-2026 1245/BWD 23/04/2025 45 A.R. TRADERS 30.74 0.00 0 0
1430 PURBA BARDHAMAN Kalna - II Burdwan Division SADHPUKHARIA PIPED WATER SUPPLY SCHEME , SM/16308 New Material Requisition To Resource Division RTOR000048/2023-2024 1962/BWD 25/04/2023 Resource Division 1.38 0.00 0 0
1431 PURBA BARDHAMAN Kalna - II Burdwan Division SADHPUKHARIA PIPED WATER SUPPLY SCHEME , SM/16308 New Material Requisition To Resource Division RTOR000185/2023-2024 2155/BWD 10/05/2023 Resource Division 15.09 0.00 0 0
1432 PURBA BARDHAMAN Kalna - II Central Mechanical SADHPUKHARIA PIPED WATER SUPPLY SCHEME , SM/16308 New New service connection charges for Sadhpukuria PWSS TW-1 BILL/01488/2023-2024 BP-2023-24-185 04/10/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.37 0.00 0 0
1433 PURBA BARDHAMAN Kalna - II Burdwan Division SADHPUKHARIA PIPED WATER SUPPLY SCHEME , SM/16308 New Material Requisition To Resource Division RTOR000617/2023-2024 4884/BWD 10/11/2023 Resource Division 33.21 0.00 0 0
1434 PURBA BARDHAMAN Kalna - II Central Mechanical SADHPUKHARIA PIPED WATER SUPPLY SCHEME , SM/16308 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at SADHPUKHRIA Water Supply Scheme [ Block- KALNA-2 ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. [2nd CALL] ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000864/2023-2024 4131/CMD 29/08/2023 30 SIMARR 20.64 4.64 22.48 71
1435 PURBA BARDHAMAN Kalna - II Burdwan Division SADHPUKHARIA PIPED WATER SUPPLY SCHEME , SM/16308 New Work Order for "Hiring of one no. DIESEL MOTOR CAB (BS-VI) for the Office of the Assistant Engineer, Kalna Sub-Division, Burdwan Division, P.H.E. Dte. [Period from 01.12.2023 to 31.05.2024] (Vehicle No-WB 25K 4575). Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000982/2023-2024 1680/KSD 22/11/2023 183 SUSMITA MANDAL 0.87 0.20 22.99 23
1436 PURBA BARDHAMAN Kalna - II Burdwan Division SADHPUKHARIA PIPED WATER SUPPLY SCHEME , SM/16308 New Work order for "DESIGNING,MAKING AND ERECTION OF SIGN BOARD FOR SAJAL GRAM IN ¿¿6 No... VILLAGE, ¿KALNA-II... BLOCK UNDER KALNA SUB DIVISION WITHIN BURDWAN DIVISION PHE DTE.(18nos board)". Assistant Engineer Junior Engineer, R.W.S. Burdwan Sub Division, P.H.E. Dt ORD/000949/2024-2025 1983/KSD 06/12/2024 10 OMKAR ENTERPRISE 2.52 0.00 0 100
1437 PURBA BARDHAMAN Kalna - II Burdwan Division SADHPUKHARIA PIPED WATER SUPPLY SCHEME , SM/16308 New Continuation work Order for "Hiring of one no. DIESEL MOTOR CAB (BS-VI) for the Office of the Assistant Engineer, Kalna Sub-Division, Burdwan Division, P.H.E. Dte. [Period - 01.06.2024 to 30.11.2024]" (Vehicle No-WB 25K 4575) Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000461/2024-2025 273/KSD 30/05/2024 183 SUSMITA MANDAL 2.40 1.09 45.42 0
1438 PURBA BARDHAMAN Kalna - II Burdwan Division SADHPUKHARIA PIPED WATER SUPPLY SCHEME , SM/16308 New SADHPUKHARIA Piped Water Supply Scheme with sinking of Tube-well, LDS, Rising Main, FHTC, construction of switch rooms & boundary walls with gates and land development, drain and internal pathway at different TW site under Kalna-II Block, District:- Purba-Bardhaman [NEW SCHEME]. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000061/2023-2024 1934/BWD 24/04/2023 313 SUSUNIA GP CO. OPERATIVE LABOUR CONTRACT AND CONSTRUCTION SOCIETY LTD. 72.00 29.49 40.96 30
1439 PURBA BARDHAMAN Kalna - II Burdwan Division SADHPUKHARIA PIPED WATER SUPPLY SCHEME , SM/16308 New Work Order for "Hiring of one no. DIESEL MOTOR CAB (BS-VI) for the Office of the Assistant Engineer, Kalna Sub-Division, Burdwan Division, P.H.E. Dte. [Period from 01.03.2025 to 31.05.2025]". [Vehicle No- 25 K 4575]. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/001243/2024-2025 316/KSD 28/02/2025 92 SUSMITA MANDAL 1.20 0.00 0 1
1440 PURBA BARDHAMAN Kalna - II Burdwan Division SADHPUKHARIA PIPED WATER SUPPLY SCHEME , SM/16308 New Continuation work order for "Hiring of one no. DIESEL MOTOR CAB (BS-VI) for the Office of the Assistant Engineer, Kalna Sub-Division, Burdwan Division, P.H.E. Dte. [Period from 01.12.2024 to 28.02.2025]". [Vehicle No- WB 25K 4575]. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/001066/2024-2025 1896/KSD 29/11/2024 90 SUSMITA MANDAL 1.20 0.78 65 0
1441 PURBA BARDHAMAN Central Mechanical AUGMENTATION OF KASHIPUR PIPED WATER SUPPLY SCHEME , SM/16297 Augmentation Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination system and internal House wiring for Tube well no.- 1 & 2 at Augmentation of KASHIPUR[PURBASTHALI-II] Water Supply Scheme under CMD, PHE Dte., Dist.- Purba-Bardhaman. ORD/001080/2023-2024 4437/CMD 01/11/2023 30 DUTTA ENTERPRISE 24.40 0.00 0 0
1442 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF KASHIPUR PIPED WATER SUPPLY SCHEME , SM/16297 Augmentation Augmentation of KASHIPUR PWSS to accommodate FHTC, Laying Distribution System, Laying Rising Main, under Jal Jeevan Mission of Purbasthali - II Block, Purba Burdwan District under Burdwan Division, PHE.Dte. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000176/2023-2024 2588/BWD 01/06/2023 60 BAKSHI ENTERPRISE 19.74 6.93 35.11 100
1443 PURBA BARDHAMAN Central Mechanical AUGMENTATION OF KASHIPUR PIPED WATER SUPPLY SCHEME , SM/16297 Augmentation New service connection charges for Kashipur PWSS TW-1 BILL/01866/2023-2024 BP-2023-24-356 11/01/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.77 0.00 0 0
1444 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF KASHIPUR PIPED WATER SUPPLY SCHEME , SM/16297 Augmentation Work Order for "CONSTRUCTION OF TEMPORARY KIOSK FOR THE NECESSARY ARRANGEMENT OF ELECTRIFICATION OF TUBEWELL FOR KASHIPUR PWSS UNDER KALNA SUB-DIVISION UNDER BURDWAN DIVISION, PHE DTE." Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/001166/2023-2024 2022/KSD 06/03/2024 10 DEL DELTA CONSTRUCTION 0.66 0.00 0 100
1445 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF KASHIPUR PIPED WATER SUPPLY SCHEME , SM/16297 Augmentation Digital structurization of pipeline alignment and asset evaluation including holistic design, preparation of design drawings of overall LDS & preparation of estimate for 09 Nos. Piped W/S. Schemes under Purbasthali II Block under Kalna Sub-Division under Burdwan Division, PHE. Dte. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000338/2024-2025 3018/BWD 05/08/2024 50 HORIZEN 23.70 0.00 0 10
1446 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF KASHIPUR PIPED WATER SUPPLY SCHEME , SM/16297 Augmentation Different types of works involve in connection with Augmentation of JHAUDANGA (SM/16293), KASHIPUR (SM/16297), PATULI (SM/09718) & PARULIA (SM/09719) Piped water supply scheme under Purbasthali-II Block, Kalna Sub-Division, PHE Dte. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000163/2024-2025 2202/BWD 13/06/2024 360 MONDAL PRECISION PVT LTD 570.00 0.00 0 2
1447 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF RAHATPUR PIPED WATER SUPPLY SCHEME , SM/16306 Augmentation Augmentation of RAHATPUR PWSS to accommodate FHTC, Laying Distribution System, Laying Rising Main, under Jal Jeevan Mission of Purbasthali - I Block, Purba Burdwan District under Burdwan Division, PHE. Dte. ORD/000084/2023-2024 2114/BWD 10/05/2023 60 BARDHAMAN AQUA ENGINEERING 18.67 6.75 36.15 100
1448 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF RAHATPUR PIPED WATER SUPPLY SCHEME , SM/16306 Augmentation Different Types of work involved in connection with Augmentation of RAHATPUR (SM/16306) & LAKSHMANPUR (SM/13493) Piped water supply scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000176/2024-2025 2069/BWD 07/06/2024 120 SAIKAT RAY 213.73 0.00 0 2
1449 PURBA BARDHAMAN Central Mechanical AUGMENTATION OF RAHATPUR PIPED WATER SUPPLY SCHEME , SM/16306 Augmentation Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination system and internal House wiring for Tube well no.- 1 & 2 at Augmentation of RAHATPUR[PURBASTHALI-I] Water Supply Scheme under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/001083/2023-2024 4474/CMD 05/10/2023 580 S.K. ELECTRICALS 23.71 0.00 0 100
1450 PURBA BARDHAMAN Central Mechanical AUGMENTATION OF BUNDEBAJ PIPED WATER SUPPLY SCHEME , SM/16196 Augmentation Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination system and internal House wiring for Tube well no.- 1 & 2 at Augmentation of BUNDEBAJ[KALNA-II] Water Supply Scheme under CMD, PHE Dte., Dist.- Purba-Bardhaman. ORD/001078/2023-2024 4202/CMD 29/08/2023 30 C.M. ENTERPRISE 24.42 0.00 0 0
1451 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF BUNDEBAJ PIPED WATER SUPPLY SCHEME , SM/16196 Augmentation Augmentation of BUNDEBAJ PWSS to accommodate FHTC Laying Distribution System, Laying Rising Main, under Jal Jeevan Mission of Kalna - II Block, Purba Burdwan District under Burdwan Division, PHE. Dte. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000728/2023-2024 4615/BWD 17/10/2023 60 M/S CHANDRANATH MUKHERJEE 39.76 0.00 0 100
1452 PURBA BARDHAMAN Central Mechanical AUGMENTATION OF BUNDEBAJ PIPED WATER SUPPLY SCHEME , SM/16196 Augmentation Quotation for load enhancement of Bundebaj PH-2 BILL/00813/2024-2025 BP-2024-25-304 24/09/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 0.51 0.00 0 0
1453 PURBA BARDHAMAN Central Mechanical AUGMENTATION OF BUNDEBAJ PIPED WATER SUPPLY SCHEME , SM/16196 Augmentation Quotation for load enhancement of Bundebaj PWSS TW-2 BILL/00812/2024-2025 BP-2024-25-303 24/09/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 0.51 0.00 0 0
1454 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF BUNDEBAJ PIPED WATER SUPPLY SCHEME , SM/16196 Augmentation Different Types of work involved in connection with Augmentation of 6 Nos. [(SM/07827), (SM/07866), (SM/16196), (SM/18314), (SM/16021), (SM/16019)] Piped Water Supply Scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/001144/2024-2025 618/BWD 11/02/2025 180 M/S DATTA ENTERPRISE 578.09 0.00 0 0
1455 PURBA BARDHAMAN Raina - I Burdwan Division SIPTA PIPED WATER SUPPLY SCHEME , SM/16618 New Material Requisition To Resource Division RTOR000155/2023-2024 2155/BWD 10/05/2023 Resource Division 8.72 0.00 0 0
1456 PURBA BARDHAMAN Raina - I Central Mechanical SIPTA PIPED WATER SUPPLY SCHEME , SM/16618 New New service connection charges for Sipta PWSS TW-1 BILL/00795/2023-2024 BP-2023-24-88 26/07/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 2.76 0.00 0 0
1457 PURBA BARDHAMAN Raina - I Central Mechanical SIPTA PIPED WATER SUPPLY SCHEME , SM/16618 New New service connection charges for Sipta PWSS TW-2 BILL/00796/2023-2024 BP-2023-24-89 26/07/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.07 0.00 0 0
1458 PURBA BARDHAMAN Raina - I Burdwan Division SIPTA PIPED WATER SUPPLY SCHEME , SM/16618 New Material Requisition To Resource Division RTOR000694/2023-2024 5058/BWD 23/11/2023 Resource Division 20.46 0.00 0 0
1459 PURBA BARDHAMAN Raina - I Burdwan Division SIPTA PIPED WATER SUPPLY SCHEME , SM/16618 New SIPTA Single Village Scheme with sinking of LDS, Rising Main and FHTC under Raina-I Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000100/2023-2024 2258/BWD 18/05/2023 90 ROY CONSTRUCTION 115.09 90.92 79 100
1460 PURBA BARDHAMAN Raina - I Burdwan Division SIPTA PIPED WATER SUPPLY SCHEME , SM/16618 New SIPTA Single Village Scheme with sinking of Tube-well & construction of switch rooms & boundary walls with gates and land development, drain and internal pathway at different TW site under Raina-I Block, District:- Purba-Bardhaman [NEW SCHEME]. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000794/2022-2023 1444/BWD 24/03/2023 90 S.B. ASSOCIATES 49.61 31.66 63.82 100
1461 PURBA BARDHAMAN Raina - I Burdwan Division SIPTA PIPED WATER SUPPLY SCHEME , SM/16618 New Providing 20 Nos.FHTC at SIPTA village for declearation of SWAJALGRAM under SIPTA Piped Water Supply Scheme, Block- Raina-I within Burdwan Sub Division under Burdwan Division PHE Dte JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000514/2024-2025 1861/BSD 22/08/2024 30 ROY CONSTRUCTION 0.96 0.00 0 0
1462 PURBA BARDHAMAN Raina - I Central Mechanical SIPTA PIPED WATER SUPPLY SCHEME , SM/16618 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Bajitpur, Belsar & other water supply scheme under Raina-1 Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000117/2024-2025 2589/CMD 27/08/2024 90 DEY ENTERPRISE 74.58 0.00 0 0
1463 PURBA BARDHAMAN Raina - I Central Mechanical SIPTA PIPED WATER SUPPLY SCHEME , SM/16618 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at Sipta Water Supply Scheme [ Block- Raina-1 ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000147/2023-2024 2880/CMD 07/07/2023 30 S.G. ENTERPRISE 28.95 17.47 60.35 95
1464 PURBA BARDHAMAN Raina - I Burdwan Division SIPTA PIPED WATER SUPPLY SCHEME , SM/16618 New Construction of approach road near 2nd. Tube well site of SIPTA Water Supply Scheme [New Scheme], Raina-I, under Burdwan Sub Division PHE Dte. under Burdwan Division PHE. Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/001046/2024-2025 211/BWD 09/01/2025 30 SAIKAT RAY 7.20 0.00 0 0
1465 PURBA BARDHAMAN Raina - I Burdwan Division SIPTA PIPED WATER SUPPLY SCHEME , SM/16618 New Restore of village Road dismalted by laying pipe line at for providing FHTC at Kukre village under SIPTA PIPED WATER SUPPLY SCHEME [new scheme],Block-Raina-I,within Burdwan Sub Division under Burdwan Division PHE Dte. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/001174/2024-2025 261/BSD 05/02/2025 15 ROY CONSTRUCTION 0.96 0.00 0 0
1466 PURBA BARDHAMAN Raina - I Burdwan Division SIPTA PIPED WATER SUPPLY SCHEME , SM/16618 New Restore of village Road dismalted by laying pipeline at for providing FHTC at Sipta village under SIPTA PIPED WATER SUPPLY SCHEME[news cheme],Block-Raina-I,within Burdwan Sub Division under Burdwan Division PHE Dte. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/001283/2024-2025 505/BSD 06/03/2025 30 STRATEGIC BUILDCON 0.96 0.00 0 0
1467 PURBA BARDHAMAN Ketugram - II Burdwan Division KANKURHATI PIPED WATER SUPPLY SCHEME , SM/16031 New Material Requisition To Resource Division RTOR000007/2023-2024 1962/BWD 25/04/2023 Resource Division 0.87 0.00 0 0
1468 PURBA BARDHAMAN Ketugram - II Burdwan Division KANKURHATI PIPED WATER SUPPLY SCHEME , SM/16031 New Material Requisition To Resource Division RTOR000164/2023-2024 2155/BWD 10/05/2023 Resource Division 21.70 0.00 0 0
1469 PURBA BARDHAMAN Ketugram - II Central Mechanical KANKURHATI PIPED WATER SUPPLY SCHEME , SM/16031 New New service connection charges for Kankurhati W/S Scheme TW-1 BILL/00682/2023-2024 BP-2023-24-28 22/06/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.49 0.00 0 0
1470 PURBA BARDHAMAN Ketugram - II Central Mechanical KANKURHATI PIPED WATER SUPPLY SCHEME , SM/16031 New Supply & Installation of Submersible Pumping Machinery , Voltage Stabilizer, Chlorination system and internal House wiring for Tube well no.- 1 & 2 at KANKURHATI [KETUGRAM-II] Water Supply Scheme under CMD, PHE Dte., Dist.- Purba-Bardhaman. Driller In-Charge Junior Engineer ORD/000058/2023-2024 2519/CMD 02/06/2023 30 P.K. ENGINEERING 21.26 9.52 44.78 40
1471 PURBA BARDHAMAN Ketugram - II Burdwan Division KANKURHATI PIPED WATER SUPPLY SCHEME , SM/16031 New Material Requisition To Resource Division RTOR000564/2023-2024 4938/BWD 10/11/2023 Resource Division 0.73 0.00 0 0
1472 PURBA BARDHAMAN Ketugram - II Central Mechanical KANKURHATI PIPED WATER SUPPLY SCHEME , SM/16031 New New service connection charges for Kankurhati PWSS TW-2 BILL/01129/2024-2025 BP-2023-24-406 04/12/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 5.45 0.00 0 0
1473 PURBA BARDHAMAN Ketugram - II Burdwan Division KANKURHATI PIPED WATER SUPPLY SCHEME , SM/16031 New KANKURHATI Piped Water Supply Scheme with sinking of Tube-well, LDS, Rising Main, FHTC, & construction of switch rooms & boundary walls with gates and land development, drain and internal pathway at KANKURHATI Mouza (J.L. - 120) under KETUGRAM -II Block, District:- Purba-Bardhaman [NEW SCHEME]. Assistant Engineer JUNIOR ENGINEER R.W.S. BURDWAN SUB-DIVISION PHE DTE ORD/000791/2022-2023 1428/BWD 24/03/2023 648 HAMID SK 77.54 54.70 70.54 100
1474 PURBA BARDHAMAN Ketugram - II Burdwan Division KANKURHATI PIPED WATER SUPPLY SCHEME , SM/16031 New KANKURHATI Piped Water Supply Scheme (Balance Portion) with sinking of Tube-well, LDS, Rising Main, FHTC, & construction of switch rooms & boundary walls with gates and land development, drain and internal pathway at BEGUNKHOLA Mouza (J.L. - 121) under KETUGRAM -II Block, District:- Purba-Bardhaman [NEW SCHEME]_2ND CALL. Assistant Engineer JUNIOR ENGINEER R.W.S. BURDWAN SUB-DIVISION PHE DTE ORD/001016/2023-2024 517/BWD 06/02/2024 447 OM ENTERPRISE 60.20 0.00 0 80
1475 PURBA BARDHAMAN Khandaghosh Burdwan Division ONARI PIPED WATER SUPPLY SCHEME , SM/18246 New Material Requisition To Resource Division RTOR000359/2023-2024 2197/BWD 12/05/2023 Resource Division 14.41 0.00 0 0
1476 PURBA BARDHAMAN Khandaghosh Burdwan Division ONARI PIPED WATER SUPPLY SCHEME , SM/18246 New Material Requisition To Resource Division RTOR000403/2023-2024 3829/BWD 01/09/2023 Resource Division 24.57 0.00 0 0
1477 PURBA BARDHAMAN Khandaghosh Central Mechanical ONARI PIPED WATER SUPPLY SCHEME , SM/18246 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at Onari Water Supply Scheme [ Block- Khandogosh ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER Junior Engineer ORD/000680/2023-2024 4012/CMD 29/08/2023 30 M/S. S.R. ENTERPRISE 28.09 0.00 0 0
1478 PURBA BARDHAMAN Khandaghosh Burdwan Division ONARI PIPED WATER SUPPLY SCHEME , SM/18246 New Material Requisition To Resource Division RTOR000685/2023-2024 5075/BWD 23/11/2023 Resource Division 20.46 0.00 0 0
1479 PURBA BARDHAMAN Khandaghosh Central Mechanical ONARI PIPED WATER SUPPLY SCHEME , SM/18246 New New Service connection for Onari PWSS TW-2. BILL/02897/2023-2024 BP-2023-24-620 07/03/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 7.68 0.00 0 0
1480 PURBA BARDHAMAN Khandaghosh Central Mechanical ONARI PIPED WATER SUPPLY SCHEME , SM/18246 New New service connection for Onari PWSS TW-1. BILL/02892/2023-2024 BP-2023-24-619 07/03/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 7.68 0.00 0 0
1481 PURBA BARDHAMAN Khandaghosh Central Mechanical ONARI PIPED WATER SUPPLY SCHEME , SM/18246 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at BICHKHARA & others water supply scheme under Khandoghosh Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman ASSISTANT ENGINEER Junior Engineer ORD/000064/2024-2025 2390/CMD 02/08/2024 90 MS DAS ELECTRIC CO 46.54 0.00 0 0
1482 PURBA BARDHAMAN Khandaghosh Burdwan Division ONARI PIPED WATER SUPPLY SCHEME , SM/18246 New Repairing damaged concrete road by Cement concrete (mix 1:1.5:3) and drainage system, Sluice valve chamber for FHTC work for KHANDAGHOSH, TARAPOSH, SAGRAI, SANKARI, KHUDKURI, ONARI PWSS and its adjoining mouzas within KHANDAGHOSH BLOCK under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000689/2024-2025 3684/BWD 23/10/2024 90 SUPRIYA RAY 115.68 0.00 0 0
1483 PURBA BARDHAMAN Khandaghosh Burdwan Division ONARI PIPED WATER SUPPLY SCHEME , SM/18246 New Field level data validation of FHTC executed by Agencies on the basis of pictorial data with the objective of controlling multiple entry,improving data quality in terms of absolute household by verification through electric connection or any other unique documents and making error free database of ONARI Pipe Water Supply Scheme in Khandaghosh Block within Burdwan Sub-Division under Burdwan Division,PHE Dte. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000892/2024-2025 2672/BSD 04/12/2024 30 TECHVISION 0.99 0.00 0 0
1484 PURBA BARDHAMAN Khandaghosh Burdwan Division ONARI PIPED WATER SUPPLY SCHEME , SM/18246 New Supply of flow control devices and CIDF Pipes for ONARI PWSS (SM/18246) under Burdwan Division, PHE Dte._2ND CALL JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/001024/2024-2025 81/AE/HQ 07/01/2025 45 MAKALI ENGINEERING CORPORATION 9.95 0.00 0 0
1485 PURBA BARDHAMAN Khandaghosh Burdwan Division ONARI PIPED WATER SUPPLY SCHEME , SM/18246 New Material Requisition To Resource Division RTOR000034/2024-2025 314/BWD 15/01/2025 Resource Division 3.78 0.00 0 0
1486 PURBA BARDHAMAN Khandaghosh Burdwan Division ONARI PIPED WATER SUPPLY SCHEME , SM/18246 New Different works related (sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of different capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site) to ONARI & SASANGA Piped Water Supply Scheme under Khandaghosh Block, District:- Purba-Bardhaman [NEW SCHEME]_2ND CALL Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000452/2023-2024 3430/BWD 07/08/2023 786 M/S JAN MAHAMMAD 1,398.82 35.00 2.5 50
1487 PURBA BARDHAMAN Bhatar Burdwan Division PASHALA PIPED WATER SUPPLY SCHEME , SM/15245 New Material Requisition To Resource Division RTOR000080/2023-2024 1962/BWD 25/04/2023 Resource Division 0.33 0.00 0 0
1488 PURBA BARDHAMAN Bhatar Burdwan Division PASHALA PIPED WATER SUPPLY SCHEME , SM/15245 New Material Requisition To Resource Division RTOR000367/2023-2024 2197/BWD 12/05/2023 Resource Division 4.80 0.00 0 0
1489 PURBA BARDHAMAN Bhatar Central Mechanical PASHALA PIPED WATER SUPPLY SCHEME , SM/15245 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at PASHALA Water Supply Scheme [ Block-BHATAR ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000777/2023-2024 4071/CMD 29/08/2023 30 SOUNAK ENTERPRISE 27.79 0.00 0 0
1490 PURBA BARDHAMAN Bhatar Burdwan Division PASHALA PIPED WATER SUPPLY SCHEME , SM/15245 New Material Requisition To Resource Division RTOR000757/2023-2024 5242/BWD 30/11/2023 Resource Division 18.50 0.00 0 0
1491 PURBA BARDHAMAN Bhatar Central Mechanical PASHALA PIPED WATER SUPPLY SCHEME , SM/15245 New NEW SERVICE CONNECTION FOR PASHALA PWSS BILL/02594/2023-2024 BP-2023-24-550 20/02/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 4.16 0.00 0 0
1492 PURBA BARDHAMAN Bhatar Central Mechanical PASHALA PIPED WATER SUPPLY SCHEME , SM/15245 New NEW SERVICE CONNECTION FOR PASHALA PWSS BILL/02595/2023-2024 BP-2023-24-549 20/02/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 14.97 0.00 0 0
1493 PURBA BARDHAMAN Bhatar Central Mechanical PASHALA PIPED WATER SUPPLY SCHEME , SM/15245 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Karjana & others water supply scheme under Bhatar Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000067/2024-2025 2394/CMD 02/08/2024 90 AHALYA ENGINEERING WORKS 82.00 0.00 0 0
1494 PURBA BARDHAMAN Bhatar Burdwan Division PASHALA PIPED WATER SUPPLY SCHEME , SM/15245 New Different works related (sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of different capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site) to NABASTA, PASHALA & POALKURA Piped Water Supply Scheme under Bhatar Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer1, Durgapur Sub-Division, PHE Dte.,Junior Engineer2, Durgapur Sub-Division, PHE Dte. ORD/000739/2023-2024 4652/BWD 31/10/2023 702 STARCO CONSTRUCTIONS 900.17 0.00 0 2
1495 PURBA BARDHAMAN Khandaghosh Burdwan Division SULTANPUR PIPED WATER SUPPLY SCHEME , SM/18607 New Material Requisition To Resource Division RTOR000327/2023-2024 2197/BWD 12/05/2023 Resource Division 17.55 0.00 0 0
1496 PURBA BARDHAMAN Khandaghosh Burdwan Division SULTANPUR PIPED WATER SUPPLY SCHEME , SM/18607 New Material Requisition To Resource Division RTOR000522/2023-2024 4301/BWD 29/09/2023 Resource Division 6.53 0.00 0 0
1497 PURBA BARDHAMAN Khandaghosh Central Mechanical SULTANPUR PIPED WATER SUPPLY SCHEME , SM/18607 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at Sultanpur Water Supply Scheme [ Block- Khandogosh ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER Junior Engineer ORD/000707/2023-2024 4018/CMD 29/08/2023 30 SUBRATA BHADRA 28.96 0.00 0 0
1498 PURBA BARDHAMAN Khandaghosh Burdwan Division SULTANPUR PIPED WATER SUPPLY SCHEME , SM/18607 New Material Requisition To Resource Division RTOR000695/2023-2024 5071/BWD 23/11/2023 Resource Division 20.46 0.00 0 0
1499 PURBA BARDHAMAN Khandaghosh Central Mechanical SULTANPUR PIPED WATER SUPPLY SCHEME , SM/18607 New Quotation for new service connection at SULTANPUR W/S Scheme PH-I. BILL/01812/2023-2024 BP-2023-24-324 30/12/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.49 0.00 0 0
1500 PURBA BARDHAMAN Khandaghosh Burdwan Division SULTANPUR PIPED WATER SUPPLY SCHEME , SM/18607 New Land demarcation and preparation of sketch map for Haldi, Sultanpur, Berugram & Karail Piped W/S. Scheme (New Scheme) at different Blocks under JJM under Burdwan Division, PHE Dte. AE(HQs) J.E. 1 BURDWAN ORD/000756/2023-2024 842/AE/HQ 01/11/2023 15 M/S S. CHOUDHURY 0.33 0.00 0 100
1501 PURBA BARDHAMAN Khandaghosh Central Mechanical SULTANPUR PIPED WATER SUPPLY SCHEME , SM/18607 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at BICHKHARA & others water supply scheme under Khandoghosh Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman ASSISTANT ENGINEER Junior Engineer ORD/000064/2024-2025 2390/CMD 02/08/2024 90 MS DAS ELECTRIC CO 46.54 0.00 0 0
1502 PURBA BARDHAMAN Khandaghosh Burdwan Division SULTANPUR PIPED WATER SUPPLY SCHEME , SM/18607 New Balance work of BERUGRAM & SULTANPUR Piped Water Supply Scheme with sinking of Tube-well, LDS, FHTC & construction of switch rooms & boundary walls with gates and land development, drain and internal pathway at different TW site under Khandaghosh Block, District:- Purba-Bardhaman. Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/001214/2024-2025 723/BWD 24/02/2025 180 MD HASIN 438.83 0.00 0 0
1503 PURBA BARDHAMAN Khandaghosh Burdwan Division SULTANPUR PIPED WATER SUPPLY SCHEME , SM/18607 New Different works related (sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of different capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site) to BERUGRAM & SULTANPUR Piped Water Supply Scheme under Khandaghosh Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer ORD/000979/2023-2024 092/BWD 05/01/2024 604 SK ALIM 1,368.51 0.00 0 55
1504 PURBA BARDHAMAN Khandaghosh Central Mechanical SULTANPUR PIPED WATER SUPPLY SCHEME , SM/18607 New Electric quotation bill for NEW service connection at SULTANPUR water supply scheme, P.H No.-2 (Block-Khandaghosh) BILL/01472/2024-2025 BP-2024-25-441 18/03/2025 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 10.91 0.00 0 null
1505 PURBA BARDHAMAN Galsi - I Burdwan Division LOAPUR PIPED WATER SUPPLY SCHEME , SM/18323 New Material Requisition To Resource Division RTOR000395/2023-2024 2197/BWD 12/05/2023 Resource Division 3.72 0.00 0 0
1506 PURBA BARDHAMAN Galsi - I Burdwan Division LOAPUR PIPED WATER SUPPLY SCHEME , SM/18323 New Material Requisition To Resource Division RTOR000444/2023-2024 3845/BWD 01/09/2023 Resource Division 164.37 0.00 0 0
1507 PURBA BARDHAMAN Galsi - I Central Mechanical LOAPUR PIPED WATER SUPPLY SCHEME , SM/18323 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1, 2, 3 & 4 at LOAPUR Water Supply Scheme [ Block- Galsi-2 ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. Driller In-Charge JUNIOR ENGINEER ORD/000918/2023-2024 4182/CMD 29/08/2023 30 M/S, S.S. ENTERPRISE. 56.97 0.00 0 0
1508 PURBA BARDHAMAN Galsi - I Burdwan Division LOAPUR PIPED WATER SUPPLY SCHEME , SM/18323 New Material Requisition To Resource Division RTOR000560/2023-2024 4918/BWD 10/11/2023 Resource Division 60.13 0.00 0 0
1509 PURBA BARDHAMAN Galsi - I Central Mechanical LOAPUR PIPED WATER SUPPLY SCHEME , SM/18323 New NEW SERVICE CONNECTION FOR LOHAPUR PWSS PH-1. BILL/03137/2023-2024 BP-2023-24-651 20/03/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 4.92 0.00 0 0
1510 PURBA BARDHAMAN Galsi - I Burdwan Division LOAPUR PIPED WATER SUPPLY SCHEME , SM/18323 New LOAPUR Piped Water Supply Scheme with sinking of Tube-well, LDS, Rising Main, FHTC, Construction of 600 cum capacity RCC OHR with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drain and internal pathway at different TW site under Galsi-I Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer1, Durgapur Sub-Division, PHE Dte. ORD/000419/2023-2024 3290/BWD 31/07/2023 365 M/S ASHA CONSTRUCTION 824.72 34.03 4.13 15
1511 PURBA BARDHAMAN Galsi - I Central Mechanical LOAPUR PIPED WATER SUPPLY SCHEME , SM/18323 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Satinandi,Sanko & others water supply scheme under Galsi-1 Block ; Serpur, Uchalan & others water supply scheme under Raina-2 Block and maro, loapur & others water supply scheme under Galsi-2 block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000397/2024-2025 2751/CMD 24/09/2024 90 ORIENTAL ENGINEERING CO. 88.42 0.00 0 0
1512 PURBA BARDHAMAN Galsi - I Durgapur W/S Division LOAPUR PIPED WATER SUPPLY SCHEME , SM/18323 New Acceptance cum Formal Work Order for Balance work of dismantling concrete road including mending work, construction of approach road by fill up stone dust , bolders etc. and allied works under LOAPUR Water Supply Scheme, Galsi-I Block, District:- Purba-Bardhaman. Assistant Engineer-II JUNIOR ENGINEER-1 ORD/000166/2024-2025 1595/DWSD 25/11/2024 120 M/S ASHA CONSTRUCTION 95.37 0.00 0 0
1513 PURBA BARDHAMAN Galsi - I Durgapur W/S Division LOAPUR PIPED WATER SUPPLY SCHEME , SM/18323 New Material Requisition To Resource Division RTOR000007/2024-2025 1724/S/DWSD 10/12/2024 Resource Division 17.89 0.00 0 0
1514 PURBA BARDHAMAN Galsi - I Central Mechanical LOAPUR PIPED WATER SUPPLY SCHEME , SM/18323 New QUOTATION FOR NEW SERVICE CONNECTION AT LOAPUR PWSS P.H-2 BILL/01293/2024-2025 BP-2024-25-427 31/01/2025 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 10.70 0.00 0 null
1515 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting at Dhoba and Goalpara Mouzas of Nasratpur PWSS , SM/06745 Retrofitting Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of NASARATPUR Piped Water Supply Scheme at Purbasthali-I Block under Burdwan Division, PHE Dte._2ND CALL. AE(HQs) J.E. 2 BURDWAN ORD/000174/2021-2022 6079/BWD 08/10/2021 60 BRINDABAN KONAR 54.89 39.18 71.38 1
1516 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting at Dhoba and Goalpara Mouzas of Nasratpur PWSS , SM/06745 Retrofitting Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of NASARATPUR Piped Water Supply Scheme at Gopinathpur (Part), Nasaratput (Part) & Paruldanga (Part) Village (Mouza), Purbasthali - I Block under Burdwan Division, PHE Dte Assistant Engineer ORD/000372/2021-2022 211/BWD 11/01/2022 60 KHEPIMA ENGINEERS CO. OPERATIVE SOCIETY LTD. 76.77 15.16 19.75 1
1517 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting at Dhoba and Goalpara Mouzas of Nasratpur PWSS , SM/06745 Retrofitting Work order for Repairing of leakage of existing pipe line of Nasaratpur habitation of Purbasthali-I Block within Kalna Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000124/2023-2024 419/KSD 11/05/2023 30 PARTHA PRATIM ACHARYA 0.97 0.00 0 50
1518 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting at Dhoba and Goalpara Mouzas of Nasratpur PWSS , SM/06745 Retrofitting Restoration work of Kulti Haritala to Jamna Bus stand via Krishnapur, Baharkuli,Sargoria road from 3.15 km to 5.70 km, damaged due to laying of underground water pipe line by PHE with box cutting and Jhama with moorum consolidation under Kalna Highway Sub Division of Burdwan South Highway Division, P.W(Roads) Dte. during the year 2023-24. BILL/00891/2024-2025 1025/JJM 05/10/2024 EXECUTIVE ENGINEER BURDWAN SOUTH HIGHWAY DIVISION P.W. (ROADS) DTE. 5.36 0.00 0 null
1519 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting at Dhoba and Goalpara Mouzas of Nasratpur PWSS , SM/06745 Retrofitting Restoration work of Kalna baidyapur road from 7.90 km to 13.75 km (in stretches) damaged due to laying of underground water pipe line by PHE with box cutting and Jhama with moorum consolidation under Kalna Highway Sub-Division of Burdwan South Highway Division, P.W (Roads) Dte. during the year 2023-2024. BILL/00890/2024-2025 1025/JJM 05/10/2024 EXECUTIVE ENGINEER BURDWAN SOUTH HIGHWAY DIVISION P.W. (ROADS) DTE. 8.10 0.00 0 null
1520 PURBA BARDHAMAN Mangolkote Burdwan Division LAKSHIMPUR PWSS , SM/18457 New Material Requisition To Resource Division RTOR000527/2023-2024 4302/BWD 29/09/2023 Resource Division 10.51 0.00 0 0
1521 PURBA BARDHAMAN Mangolkote Burdwan Division LAKSHIMPUR PWSS , SM/18457 New Material Requisition To Resource Division RTOR000569/2023-2024 4941/BWD 10/11/2023 Resource Division 27.49 0.00 0 0
1522 PURBA BARDHAMAN Mangolkote Burdwan Division LAKSHIMPUR PWSS , SM/18457 New Material Requisition To Resource Division RTOR000773/2023-2024 206/BWD 10/01/2024 Resource Division 17.75 0.00 0 0
1523 PURBA BARDHAMAN Mangolkote Central Mechanical LAKSHIMPUR PWSS , SM/18457 New NEW SERVICE CONNECTION FOR LAKSHIMPUR PWSS TW-1 BILL/00188/2024-2025 BP-2024-25-89 15/05/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.14 0.00 0 0
1524 PURBA BARDHAMAN Mangolkote Burdwan Division LAKSHIMPUR PWSS , SM/18457 New Different works related (sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of different capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site) to SIMULIA & LAKSHIMPUR Piped Water Supply Scheme under Mongalkote Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer JUNIOR ENGINEER R.W.S. BURDWAN SUB-DIVISION PHE DTE ORD/000694/2023-2024 4363/BWD 04/10/2023 365 PUSPA ENTERPRISE 1,090.95 0.00 0 37
1525 PURBA BARDHAMAN Mangolkote Central Mechanical LAKSHIMPUR PWSS , SM/18457 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Lakshimpur & others water supply scheme under Mangalkote Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman Driller In-Charge Junior Engineer ORD/000097/2024-2025 2406/CMD 02/08/2024 290 CHOUDHURY ENTERPRISE 57.65 0.00 0 10
1526 PURBA BARDHAMAN Mangolkote Central Mechanical LAKSHIMPUR PWSS , SM/18457 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1, 2 & 3 at LAKSHIMPUR Water Supply Scheme [ Block- MONGALKOTE ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. Driller In-Charge Junior Engineer ORD/000801/2023-2024 4087/CMD 29/08/2023 640 ORIENTAL ENGINEERING CO. 44.40 0.00 0 31
1527 PURBA BARDHAMAN Mangolkote Burdwan Division LAKSHIMPUR PWSS , SM/18457 New Different types of works involve in connection with implementation of Gohgram, Jabagram, Kherua, Lakshmipur & Simulia Piped Water Supply Scheme under Mongolkote Block within Katwa Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer ORD/001301/2024-2025 936/BWD 11/03/2025 180 M/S GHOSH CONSTRUCTION 360.68 0.00 0 0
1528 PURBA BARDHAMAN Mangolkote Central Mechanical LAKSHIMPUR PWSS , SM/18457 New Addl. Qtn for Lakshimpur T/W 1 BILL/01669/2024-2025 BP-2024-25-482 27/03/2025 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 0.66 0.00 0 null
1529 PURBA BARDHAMAN Memari - II Burdwan Division REAN PIPED WATER SUPPLY SCHEME , SM/18504 New Material Requisition To Resource Division RTOR000273/2023-2024 2197/BWD 12/05/2023 Resource Division 12.98 0.00 0 0
1530 PURBA BARDHAMAN Memari - II Burdwan Division REAN PIPED WATER SUPPLY SCHEME , SM/18504 New Material Requisition To Resource Division RTOR000426/2023-2024 3859/BWD 01/09/2023 Resource Division 13.03 0.00 0 0
1531 PURBA BARDHAMAN Memari - II Burdwan Division REAN PIPED WATER SUPPLY SCHEME , SM/18504 New Material Requisition To Resource Division RTOR000689/2023-2024 5077/BWD 23/11/2023 Resource Division 20.46 0.00 0 0
1532 PURBA BARDHAMAN Memari - II Central Mechanical REAN PIPED WATER SUPPLY SCHEME , SM/18504 New New service connection for Rean W/S scheme TW No-1 BILL/02272/2023-2024 BP-2023-24-421 19/01/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 4.00 0.00 0 0
1533 PURBA BARDHAMAN Memari - II Central Mechanical REAN PIPED WATER SUPPLY SCHEME , SM/18504 New New service connection at Rean PWSS TW -2 BILL/02329/2023-2024 BP-2023-24-453 30/01/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 6.70 0.00 0 0
1534 PURBA BARDHAMAN Memari - II Central Mechanical REAN PIPED WATER SUPPLY SCHEME , SM/18504 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System, Internal House Wiring and compound lighting arrangement for Tube well No.- 1 & 2 at REAN Water Supply Scheme [ BLOCK- MEMARI- II] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER Junior Engineer ORD/001602/2023-2024 1532/CMD 05/03/2024 60 SUBRATA BHADRA 28.81 0.00 0 70
1535 PURBA BARDHAMAN Memari - II Burdwan Division REAN PIPED WATER SUPPLY SCHEME , SM/18504 New Different works related (sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of different capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site) to BIJUR & REAN Piped Water Supply Scheme under Memari ¿ II Block, District:- Purba-Bardhaman [NEW SCHEME]_2ND CALL Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000481/2023-2024 3495/BWD 09/08/2023 365 NATIONAL CONSTRUCTION 1,175.31 132.85 11.3 65
1536 PURBA BARDHAMAN Memari - II Burdwan Division REAN PIPED WATER SUPPLY SCHEME , SM/18504 New Material Requisition To Resource Division RTOR000036/2024-2025 316/BWD 15/01/2025 Resource Division 2.28 0.00 0 0
1537 PURBA BARDHAMAN Memari - II Burdwan Division REAN PIPED WATER SUPPLY SCHEME , SM/18504 New Different Types of work involved in connection with different New Schemes (05 Nos.) Piped Water Supply Scheme under Memari II Block within Burdwan Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000003/2025-2026 1116/BWD 03/04/2025 120 SOFIQUL ISLAM 176.89 0.00 0 0
1538 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Natungram Piped Water Supply Scheme , SM/06970 Retrofitting Continuation work order for Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Amar village of Natungram piped water supply scheme within Burdwan Sub-Division under Burdwan Division, PHE Dte. [Phase-I](Tr No.-579/BWD/2020-21) Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000263/2020-2021 4465/BWD 11/11/2020 30 BAMDEB CONSTRUCTION & CO 4.92 4.92 100 1
1539 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Natungram Piped Water Supply Scheme , SM/06970 Retrofitting Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of Natungram Piped Water Supply Scheme at Amar (6 Nos Habitation Part), Natungram (4 Nos Habitation Part) & Bohar Village (Mouza), Bardhaman-I Block under Burdwan Division, PHE Dte.(Agreement No. 73/2020-2021 OF SE/CC/PHE. DTE.) Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000140/2020-2021 7052/BWD 22/12/2020 90 HAMID SK 48.20 37.24 77.26 1
1540 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Natungram Piped Water Supply Scheme , SM/06970 Retrofitting Providing Functional House hold Tap connection (FHTC) from existing distribution system within the command area of NATUNGRAM piped water supply scheme at Natungram village under Bardhaman-I Block under Burdwan Division, PHE Dte.[Gr.-C] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000152/2021-2022 687/BSD 09/06/2021 30 HAMID SK 2.95 2.91 98.64 1
1541 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Natungram Piped Water Supply Scheme , SM/06970 Retrofitting Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Amra village of Natungram piped water supply scheme within Burdwan Sub-Division under Burdwan Division, PHE Dte. [Phase-I](Tr No.-332/BWD/2020-21) ORD/000079/2020-2021 2732/BWD 10/08/2020 30 BAMDEB CONSTRUCTION & CO 4.92 4.92 100 1
1542 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Natungram Piped Water Supply Scheme , SM/06970 Retrofitting Publication charges bill for the office of the Executive Engineer, Burdwan Division, PHE Dte.[Invoice No.-BCWB20RV-0001293, dt.-19/05/20, BCWB20RV-0001770, dt.-31/05/20, BCWB20RV-0001920, dt.-05/06/20, BCWB20RV-0001860, dt.-03/06/20, BCWB20RV-0001861, dt.-03/06/20, BCWB20RV-0001928, dt.-05/06/20, BCWB20RV-0001820, dt.-03/06/20, BCWB19RV-0059455, dt.-20/03/20, BCWB19RV-0059454. dt.-20/03/20, BCWB19RV-0057682, dt.-12/03/20, BCWB20RV-0003210, dt.-26/06/20, BCWB20RV-0000918, dt.-07/05/20, BCWB20RV-0001352, dt.-22/05/20, BCWB19RV-0050592, dt.-30/01/20] VCH/000411/2022-2023 240/DW/22-23 04/07/2022 BENNETT COLEMAN & COMPANY LIMITED 1.89 0.00 0 0
1543 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Natungram Piped Water Supply Scheme , SM/06970 Retrofitting Providing leftout water tap connection in different villages for 100% coverage to make it Sajal Gram from existing distribution system within scheme jurisdiction of different Piped Water Supply Schemes within Burdwan ¿ I Block under Burdwan Division, PHE. Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000342/2021-2022 32/BWD 04/01/2022 30 ROY BISWAS CONSTRUCTION 9.89 0.00 0 1
1544 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Natungram Piped Water Supply Scheme , SM/06970 Retrofitting Providing 45 Nos.FHTC at SIJEPARA village for declearation of SWAJALGRAM under NATUNGRAM Piped Water Supply Scheme , Block- Burdwan-I within Burdwan Sub Division under Burdwan Division PHE Dte JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000298/2024-2025 1280/BSD 12/07/2024 45 SHANKHA GHOSH 1.76 0.00 0 0
1545 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Natungram Piped Water Supply Scheme , SM/06970 Retrofitting Providing 50 Nos.FHTC at BIRPUR village for declearation of SWAJALGRAM under NATUNGRAM Piped Water Supply Scheme , Block- Burdwan-I within Burdwan Sub Division under Burdwan Division PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE,Junior Engineer, R.W.S. Burdwan Sub Division, P.H.E. Dt ORD/000299/2024-2025 1281/BSD 12/07/2024 45 I.S. ENTERPRISE 2.28 2.28 100 100
1546 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Chaktentul Piped Water Supply Scheme , SM/06964 Retrofitting Continuation work order for Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Chaktentul village and Chaktentul habitation of Chaktentul piped water supply scheme within Durgapur Sub-Division under Burdwan Division, PHE Dte. [Phase-I] AE(HQs) J.E. 2 BURDWAN ORD/000700/2020-2021 4455/BWD 10/11/2020 30 SAIKAT RAY 4.92 4.92 100 1
1547 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Chaktentul Piped Water Supply Scheme , SM/06964 Retrofitting Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of CHAKTENTUL Piped Water Supply Scheme at Chaktentul (1 No Part, 2 Nos Habitation), Bharatpur (2 Nos Habitation) Village (Mouza), Galsi-I Block under Burdwan Division, PHE Dte.(Agreement No. 71/2020-2021 OF SE/CC/PHE. DTE.) AE(HQs) J.E. 2 BURDWAN ORD/000128/2020-2021 5005/BWD 10/12/2020 90 SUPRIYA RAY 75.14 36.61 48.72 1
1548 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Chaktentul Piped Water Supply Scheme , SM/06964 Retrofitting Supply of materials for different water supply scheme under Burdwan Division, PHE Dte. VCH/001237/2021-2022 1132/DW 26/02/2022 EXECUTIVE ENGINEER, RESOURCES DIVISION, P.H.E. DTE. 221.00 0.00 0 0
1549 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Chaktentul Piped Water Supply Scheme , SM/06964 Retrofitting Supply of 10 mm NB Gun-metal Ferrul conforming to IS:2692-1989 for water tap connection in each house hold from existing distribution system within scheme jurisdiction in different piped water supply scheme within Durgapur (Bardhaman North) Sub-Division under Burdwan Division PHE Dte. and delivered at Barsul Divisional Store. [Part-6] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000199/2021-2022 3402/BWD 24/06/2021 30 A.K. SIKDAR 91.80 10.49 11.43 1
1550 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Chaktentul Piped Water Supply Scheme , SM/06964 Retrofitting Continuation work order for supply of 10 mm NB Gun-Metal /Brass Ferrul conforming to IS:2692-1989 for water tap connection in each household from existing distribution system within scheme jurisdiction in different piped water supply scheme within Durgapur (Bardhaman North) Sub-Division under Burdwan Division, PHE Dte. and delivered at Barsul Divisional Store.[Part-7] Assistant Engineer ORD/000348/2021-2022 2942/BWD 04/05/2021 10 KISHORE GHOSH 3.94 0.00 0 1
1551 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Chaktentul Piped Water Supply Scheme , SM/06964 Retrofitting Vehicle bill for the office of the Assistant Engineer, Durgapur Sub-Division, PHE Dte. for the month of May'23. BILL/00614/2023-2024 562/JJM 24/08/2023 SUJAUDDIN SEKH 0.40 0.00 0 0
1552 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Chaktentul Piped Water Supply Scheme , SM/06964 Retrofitting Hire & fuel charges of vehicle (Car No.-WB-37C-8293) for the month of June & July'23. BILL/00792/2023-2024 633/JJM 13/09/2023 SUJAUDDIN SEKH 0.78 0.00 0 0
1553 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Chaktentul Piped Water Supply Scheme , SM/06964 Retrofitting Hire & fuel charges of vehicle Car No.-WB-37C-8293 for the month of August'2023. BILL/01036/2023-2024 746/JJM 11/10/2023 SUJAUDDIN SEKH 0.39 0.00 0 0
1554 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Chaktentul Piped Water Supply Scheme , SM/06964 Retrofitting Repairing of valve chamber & Construction of new valve chamber and supply of sluice valve at Head Works Site for CHAKTATUL PWSS within Durgapur Sub- Division (Burdwan North) under Burdwan Division PHE Dte. Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer ORD/000932/2023-2024 905/DSD 15/12/2023 30 SAIKAT RAY 0.97 0.00 0 0
1555 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Chaktentul Piped Water Supply Scheme , SM/06964 Retrofitting Vehicle bill for the month of November'23. BILL/01674/2023-2024 1138/JJM 29/12/2023 SUJAUDDIN SEKH 0.38 0.00 0 0
1556 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Chaktentul Piped Water Supply Scheme , SM/06964 Retrofitting Laying of interconnection of Head Works Site to distribution main line for CHAKTATUL PWSS within Durgapur Sub- Division (Burdwan North) under Burdwan Division PHE Dte. Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer ORD/000933/2023-2024 906/DSD 15/12/2023 45 SAIKAT RAY 0.95 0.00 0 100
1557 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting at Manikhar PWS , SM/06751 Retrofitting Hire & fuel charges of vehicle (Car No.-WB-04G-7127) for the office of the Assistant Engineer, Kalna Sub-Division, PHE Dte. for the month of March to September'2022. BILL/00145/2022-2023 866/VEH 09/12/2022 PARTHA PRATIM ACHARYA 2.79 0.00 0 0
1558 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting at Manikhar PWS , SM/06751 Retrofitting Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of MANIKHAR Piped Water Supply Scheme at Kalna-I Block under Burdwan Division, PHE Dte. (Agreement No. 47/2020-2021 OF SE/CC/PHE. DTE.) Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000113/2020-2021 4787/BWD 02/12/2020 90 H SAMANTA 96.04 0.00 0 1
1559 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting at Manikhar PWS , SM/06751 Retrofitting Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of PANUHAT Piped Water Supply Scheme at different villages, Katwa-I Block under Burdwan Division, PHE Dte. (Part-A).[Agreement No. 727/BWD OF 2020-2021.] Assistant Engineer JUNIOR ENGINEER KATWA SUB-DIVISION PHE DTE ORD/000326/2020-2021 1688/BWD 24/02/2021 45 HAMID SK 35.66 16.34 45.82 0
1560 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting at Manikhar PWS , SM/06751 Retrofitting Supply of 10 mm NB Gun-metal Ferrule conforming to IS: 2692-1989 for Water tap connection in each house hold from existing distribution system within Scheme jurisdiction in different Piped Water Supply Scheme within Kalna Sub-Division under Burdwan Division, PHE. Dte. and delivered at Borsul Divl. Store. [Part-5]. AE(HQs) J.E. 2 BURDWAN ORD/000090/2021-2022 3590/BWD 13/07/2021 30 PREMANANDA ROY BISWAS 127.50 20.00 15.69 1
1561 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting at Manikhar PWS , SM/06751 Retrofitting Supply of 10 mm NB Gun-metal Ferrule conforming to IS: 2692-1989 for Water tap connection in each house hold from existing distribution system within Scheme jurisdiction in different Piped Water Supply Scheme within Kalna Sub-Division under Burdwan Division, PHE. Dte. and delivered at Borsul Divl. Store. [Part-4]. ORD/000004/2021-2022 3117/BWD 02/06/2021 30 PREMANANDA ROY BISWAS 76.65 0.00 0 0
1562 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting at Manikhar PWS , SM/06751 Retrofitting Supply of 10 mm NB Gun-Metal Ferrule conforming to IS:2692-1989 for water tap connection in each house hold from existing distribution system within scheme jurisdiction in different piped water supply scheme within Katwa Sub-Division under Burdwan Division, PHE Dte. and delivered at Barsul Divisional Store.[Part-4] ORD/000108/2021-2022 3186/BWD 08/06/2021 30 R.K. INDUSTRIES 76.05 0.00 0 0
1563 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting at Bundebaj PWSS , SM/06753 Retrofitting Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Bundebaj (Pt-B) village of Bundebaj Piped Water Supply Scheme within Kalna Sub-Divn. under Burdwan Division, PHE. Dte. [Phase - I] [Sl.No : 8B] (T.R. no. 377/BWD/2020-21) Assistant Engineer ORD/000138/2020-2021 2591/BWD 04/08/2020 30 MAA LAXMI ENTERPRISE 4.92 4.92 100 1
1564 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting at Bundebaj PWSS , SM/06753 Retrofitting Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Bundebaj (Pt-A) village of Bundebaj Piped Water Supply Scheme within Kalna Sub-Divn. under Burdwan Division, PHE. Dte. [Phase - I] [Sl.No : 8A] (T.R. No. 320/BWD/2020-21) Assistant Engineer ORD/000137/2020-2021 2586/BWD 04/08/2020 30 MOMINUL ISLAM MONDAL 4.92 4.92 100 1
1565 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting at Bundebaj PWSS , SM/06753 Retrofitting Continuation work order for supply of 10 mm NB Gun-Metal /Brass Ferrul conforming to IS:2692-1989 for water tap connection in each household from existing distribution system within scheme jurisdiction in different piped water supply scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. and delivered at Barsul Divisional Store.[Part-6] Assistant Engineer ORD/000867/2020-2021 4318/BWD 04/11/2020 10 MD HASIN 4.93 0.32 6.49 1
1566 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting at Bundebaj PWSS , SM/06753 Retrofitting Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Bohar village and Minapur & Khortikpara habitation of SATGACHIA piped water supply scheme within Burdwan Sub-Division under Burdwan Division, PHE Dte.[Phase-I][Gr.-4A] ORD/000739/2020-2021 3326/BWD 18/09/2020 30 SUBRATA GUPTA 4.87 4.84 99.38 0
1567 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Alipur Piped Water Supply Scheme , SM/07819 Retrofitting Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of ALIPUR Piped Water Supply Scheme at Debipur, Alipur & Benapur (2 Nos Habitation) Village (Mouza), Memari-I Block under Burdwan Division, PHE Dte. [Agreement No. 92/2020-2021 OF SE/CC/PHE. DTE.] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000423/2020-2021 812/BWD 01/02/2021 90 MD HASIN 90.85 18.82 20.72 0
1568 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Alipur Piped Water Supply Scheme , SM/07819 Retrofitting Construction of sluice valve chamber with supply of sluice valve for smooth water supply for FHTC under ALIPUR pwss within Memari- I block under Burdwan Division PHE DTE JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000516/2024-2025 1863/BSD 22/08/2024 30 ROY CONSTRUCTION 0.95 0.00 0 0
1569 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Alipur Piped Water Supply Scheme , SM/07819 Retrofitting Interconnection of 150MM DI pipeline from 2no TW to delivery line for smooth water supply for FHTC under ALIPUR pwss within Memari- I block under Burdwan Division PHE Dte. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/001018/2024-2025 09/BSD 02/01/2025 15 MUKHERJEE ENTERPRISE 0.97 0.00 0 0
1570 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Alipur Piped Water Supply Scheme , SM/07819 Retrofitting Restoration of concrete road by Cement concrete (mix 1:1.5:3), Providing balance FHTC, parallel pipeline, drainage system, boundary wall, Bridge, land development, Sluice valve chamber for smooth water supply of FHTC work for ALIPUR PWSS and its adjoining mouzas within MEMARI-I BLOCK under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/001095/2024-2025 430/BWD 20/01/2025 90 DULAL MAJUMDER 117.26 0.00 0 0
1571 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Alipur Piped Water Supply Scheme , SM/07819 Retrofitting Extension of UPVC and HDPE Pipe Line, Providing Left Out FHTC at south part of Debipur rail gate, Land Development & construction of PCC approach Road inside proposed boundary of H/W Site of ALIPUR & its adjacent mouza Water Supply Scheme under MEMARI-I Block of Burdwan Division, PHE Dte. Assistant Engineer,Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. Junior Engineer, RWS, Memari-I Dev. Bolck ORD/000287/2024-2025 2740/BWD 12/07/2024 171 M/S K.P. CONSTRUCTION 122.03 0.00 0 50
1572 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) under the command area of Dwariapur Piped Water Supply Scheme , SM/07548 Retrofitting Formal Work Order for Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of Dwariapur Piped Water Supply Scheme at Gonna (1 No. Habitation), Alutia (Part), Dwariapur (7Nos Habitation) & Lakshmiganj (5 Nos Habitation) Village (Mouza), Ausgram-I Block under Burdwan Division, PHE Dte.[Agreement No. 109/2020-2021 OF SE/CC/PHE. DTE.] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000601/2020-2021 1600/BWD 22/02/2021 60 RANADHIR SINHA 81.21 45.58 56.13 1
1573 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) under the command area of Dwariapur Piped Water Supply Scheme , SM/07548 Retrofitting Restoration of damaged pipeline of distribution main at Laxmiganj village and laying of parallel line at Gonna village for providing FHTC within Dwariapur W/S Scheme in Ausgram-II Block under Burdwan Division, P.H.E. Dte. [Gr.-G] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000336/2021-2022 06/DSD 03/01/2022 30 RANADHIR SINHA 2.11 2.11 100 1
1574 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) under the command area of Dwariapur Piped Water Supply Scheme , SM/07548 Retrofitting Restoration of damaged concrete road in connection with laying distribution system at Laxmiganj, Gonna and Gopinathbati village within Dwariapur Piped Water Supply Scheme at Ausgram-I Block within Durgapur Sub-Division under Burdwan Division, PHE Dte. [Gr.-H] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000451/2021-2022 80/DSD 11/02/2022 15 RANADHIR SINHA 4.73 4.73 100 1
1575 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) under the command area of Dwariapur Piped Water Supply Scheme , SM/07548 Retrofitting Providing leftout water tap connection in different villages for 100% coverage to make it Sajal Gram from existing distribution system within scheme jurisdiction of different Piped Water Supply Schemes within Ausgram-I Block under Burdwan Division, PHE. Dte. Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000366/2021-2022 120/BWD 07/01/2022 30 ANIRUDDHA FARUQUE 12.33 12.56 101.87 1
1576 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) under the command area of Dwariapur Piped Water Supply Scheme , SM/07548 Retrofitting Making Connection with Rising Main And Over Head Reservoir of Dwariapur W/S Scheme within Durgapur Sub-Division in Ausgram-I Block under Burdwan Division, P.H.E. Dte.[Gr.-C] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000551/2021-2022 133/DSD 02/03/2022 15 RANADHIR SINHA 0.34 0.00 0 1
1577 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) under the command area of Dwariapur Piped Water Supply Scheme , SM/07548 Retrofitting Restoration of damaged concrete road in connection with providing FHTC work at Laxmiganj, Gonna and Gopinathbati and Dwariapur village within Dwariapur Piped Water Supply Scheme at Ausgram-I Block within Durgapur Sub-Division under Burdwan Division, PHE Dte.[SL-B] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000621/2021-2022 163/DSD 16/03/2022 15 RANADHIR SINHA 4.12 4.12 100 1
1578 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) under the command area of Dwariapur Piped Water Supply Scheme , SM/07548 Retrofitting Modification to the distribution network by making a loop to augment the water supply to FHTC at Gopinathbati village of Dwariyapur and its adjoining mouzas W/S Scheme under Durgapur Sub-Division, Burdwan Division, P.H.E. Dte._2nd call[SL-05] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer2, Durgapur Sub-Division, PHE Dte. ORD/000057/2023-2024 180/DSD 18/04/2023 21 ANIRUDDHA FARUQUE 0.92 0.92 100 100
1579 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of KHETIA Piped Water Supply Scheme , SM/07863 Retrofitting Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Khetpur Palashi (Part-A) village of Khetpur Palashi piped water supply scheme within Katwa Sub-Division under Burdwan Division, PHE Dte. (Tr No.-471/BWD/2020-21) Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000350/2020-2021 241/KTS 01/10/2020 4 CHANCHAL PAL 1.19 0.00 0 1
1580 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of KHETIA Piped Water Supply Scheme , SM/07863 Retrofitting Providing Functional Household Tap Connection (FHTC) from existing distribution system at KHETIA Pipe Water Supply Scheme of Burdwan -I Block under Burdwan Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000464/2022-2023 3963/BWD 13/09/2022 30 M/S UNIQUE 6.23 5.20 83.47 1
1581 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of KHETIA Piped Water Supply Scheme , SM/07863 Retrofitting Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of Khetia Piped Water Supply Scheme at Simdali (P) village (09 Nos. (P) habs), Burdwan-I Block under Burdwan Division, PHE Dte. [Agreement No. 749/BWD OF 2020-2021] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000441/2020-2021 1496/BWD 18/02/2021 60 H SAMANTA 52.60 18.56 35.29 1
1582 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of KHETIA Piped Water Supply Scheme , SM/07863 Retrofitting Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of Khetia Piped Water Supply Scheme at Gopalbati village, Khetia village (04 Nos. habs) & Tentral village Burdwan-I Block under Burdwan Division, PHE Dte. [Agreement No. 748/BWD OF 2020-2021.] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000442/2020-2021 1495/BWD 18/02/2021 45 H SAMANTA 29.16 24.13 82.75 1
1583 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of KHETIA Piped Water Supply Scheme , SM/07863 Retrofitting Providing Functional Household Tap Connection(FHTC)from existing distribution system at Khetia Water Supply Scheme(Habitation-Khetia,Gopalbati,Tentral)of Burdwan-I Block under Burdwan Sub-Division under Burdwan Division,PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000635/2022-2023 11/BSD 06/01/2023 15 M/S UNIQUE 0.92 0.92 100 0
1584 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of KHETIA Piped Water Supply Scheme , SM/07863 Retrofitting Designing, Making and Erection of Sign Board for SAJAL GRAM in Tentral Village, Burdwan - I Block within Khetia PWSS under Burdwan Division, PHE Dte. (5 Nos Board) AE(HQs) J.E. 1 BURDWAN ORD/000733/2023-2024 826/AE/HQ 30/10/2023 30 ISHAN CONSTRUCTION 0.76 0.00 0 100
1585 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of KHETIA Piped Water Supply Scheme , SM/07863 Retrofitting Designing, Making and Erection of Sign Board for SAJAL GRAM in Gopalbati Village, Burdwan - I Block within Khetia PWSS under Burdwan Division, PHE Dte. (5 Nos Board) AE(HQs) J.E. 1 BURDWAN ORD/000732/2023-2024 825/AE/HQ 30/10/2023 30 ISHAN CONSTRUCTION 0.76 0.72 94.74 100
1586 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of KHETIA Piped Water Supply Scheme , SM/07863 Retrofitting Restoration of Pump House at Head Work site of KHETIA Piped water supply scheme at Burdwan-I Block under Burdwan Division, Dist.-Purba Bardhaman. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000120/2024-2025 1000/BSD 06/06/2024 30 DEBJYOTI GOSWAMI 0.96 0.00 0 0
1587 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of KHETIA Piped Water Supply Scheme , SM/07863 Retrofitting Allied work of interconnection between 2nd TW to distribution line for FHTC work for KHETIA Piped Water Supply Scheme and its adjoining mouzas within BURDWAN-I BLOCK under Burdwan Division, PHE Dte. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000132/2024-2025 1016/BSD 07/06/2024 45 ROY CONSTRUCTION 4.79 0.00 0 100
1588 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of KHETIA Piped Water Supply Scheme , SM/07863 Retrofitting Providing leftout FHTC with extension of Pipeline, construction of Pathway, drain, repairing of Pump House at Head Work site with allied works for NATUNGRAM and KHETIA Piped Water Supply Scheme, Block-Burdwan-I, within Burdwan Sub Division under Burdwan Division PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/001003/2024-2025 007/BWD 02/01/2025 90 M/S UNIQUE 33.59 0.00 0 0
1589 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of KHETIA Piped Water Supply Scheme , SM/07863 Retrofitting KHETIA Piped Water Supply Scheme with Rising Main & Construction of 200 cum capacity RCC OHR with 20.0 mtr. with Staging height including soil investigation at different TW site under BARDHAMAN-I Block, District:- Purba-Bardhaman. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000874/2023-2024 5330/BWD 04/12/2023 542 THE DEVELOPER 68.62 0.00 0 56
1590 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of RAIPUR Piped Water Supply Scheme , SM/07865 Retrofitting Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Basatpur village of Raipur Piped Water Supply Scheme within Burdwan Sub-Divn. under Burdwan Division, PHE. Dte. [Phase - I] [GROUP : ¿1A¿] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000679/2020-2021 2726/BWD 10/08/2020 30 ASHOK KUMAR GHOSH 4.92 4.92 100 1
1591 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of RAIPUR Piped Water Supply Scheme , SM/07865 Retrofitting Providing FHTC and extension of UPVC distribution pipeline at Raipur, Gumri, Namalpur & Mahipal habitation for RAIPUR Piped Water Supply Scheme at Burdwan - II Development Block under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000358/2021-2022 104/BWD 06/01/2022 30 ROY CONSTRUCTION 23.65 19.90 84.14 1
1592 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of RAIPUR Piped Water Supply Scheme , SM/07865 Retrofitting Providing FHTC in Purba Kashiara village for 100% coverage in Sajal Gram from existing distribution system within RAIPUR PWSS, Bardhhaman-II Development Block under Burdwan Division, PHE Dte. Gr.E. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000345/2022-2023 1368/BSD 04/08/2022 5 ASHOK KUMAR GHOSH 0.68 0.00 0 0
1593 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of RAIPUR Piped Water Supply Scheme , SM/07865 Retrofitting Shifting & Relaying of 2nd T.Well Raising main and providing 5 nos (100mm dia) S/Valve at existing dist. Line for Raipur water supply scheme at Bardhhaman-II Development Block under Burdwan Division, PHE Dte. Group: H Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000481/2022-2023 1605/BSD 14/09/2022 30 ASHOK KUMAR GHOSH 1.72 0.00 0 0
1594 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of RAIPUR Piped Water Supply Scheme , SM/07865 Retrofitting Providing functional household tap connection (FHTC) from existing distribution system within the command area of Raipur piped water supply scheme at Mahipal (05 Nos Habitation), Purba Kashiara (08 Nos. Habitation), Sahara (04 Nos. Habitation), Sonakur (07 Nos. Habitation), Baratpur (16 Nos, Habitation) & Raipur (10 Nos. Habitation) village, Bardhaman-II Block under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000533/2020-2021 5007/BWD 10/12/2020 90 ASHOK KUMAR GHOSH 43.99 3.76 8.55 1
1595 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of RAIPUR Piped Water Supply Scheme , SM/07865 Retrofitting Providing FHTC (12 Nos.) and extension of UPVC distribution pipeline at Basatpur Habitation for Raipur water supply scheme at Burdwan-II Development Block under Burdwan Division, PHE Dte.[Gr.-A] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000543/2021-2022 1461/BSD 01/11/2021 30 ASHOK KUMAR GHOSH 2.14 2.14 100 1
1596 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of RAIPUR Piped Water Supply Scheme , SM/07865 Retrofitting Sinking of 300 X 200mm dia Tube Well 150 mtr. Depth by D.R. Rig method using UPVC pipe (CM) and UPVC Deep Well Screen (RMS) of RAIPUR & its adjoining mouzas Piped Water Supply Scheme, Block - Burdwan - II, Dist - Purba Bardhaman under Burdwan Division, PHE Dte. _2ND CALL. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000568/2022-2023 5273/BWD 30/11/2022 30 SUSUNIA GP CO. OPERATIVE LABOUR CONTRACT AND CONSTRUCTION SOCIETY LTD. 9.45 7.80 82.54 1
1597 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of RAIPUR Piped Water Supply Scheme , SM/07865 Retrofitting Construction of Pump House cum chlorine room without sanitary and water supply arrangement at Tube Well Site to departmental drawing no-PHE/BD/P.H/DRG/02/DEC-17(Size 3.60 mtr x 3.00 mtr room) for RAIPUR its Adjoining Mouza W/S Scheme, Block -Bardhaman-II within Burdwan Sub-Division, PHE Dte. (Mouza- PURBA KASHIARA) Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000839/2022-2023 501/BSD 21/03/2023 45 IRIN CONSTRUCTION CO. 3.30 2.72 82.42 100
1598 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of RAIPUR Piped Water Supply Scheme , SM/07865 Retrofitting Laying of inter connection between 3rd tube well site and distribution system for Raipur PWSS within Bardhaman-II Block, under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. Junior Engineer, Burdwan Sadar Sub-Division ORD/000574/2023-2024 2039/BSD 24/08/2023 45 ISHAN CONSTRUCTION 1.57 1.56 99.36 100
1599 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of RAIPUR Piped Water Supply Scheme , SM/07865 Retrofitting Designing, Making and Erection of Sign Board for SAJAL GRAM in Basatpur Village, Burdwan - II Block within Raipur PWSS under Burdwan Division, PHE Dte. (5 Nos Board) AE(HQs) J.E. 1 BURDWAN ORD/000776/2023-2024 856/AE/HQ 06/11/2023 30 MANABSEBA PROKALPA & CONSTRUCTIONS 0.75 0.00 0 100
1600 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of RAIPUR Piped Water Supply Scheme , SM/07865 Retrofitting Designing, Making and Erection of Sign Board for SAJAL GRAM in Mahipal Village, Burdwan - II Block within Raipur PWSS under Burdwan Division, PHE Dte. (5 Nos Board) AE(HQs) J.E. 1 BURDWAN ORD/000775/2023-2024 854/AE/HQ 06/11/2023 30 MANABSEBA PROKALPA & CONSTRUCTIONS 0.75 0.00 0 100
1601 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of RAIPUR Piped Water Supply Scheme , SM/07865 Retrofitting Designing, Making and Erection of Sign Board for SAJAL GRAM in Purba Kashiara Village, Burdwan - II Block within Raipur PWSS under Burdwan Division, PHE Dte. (5 Nos Board) AE(HQs) J.E. 1 BURDWAN ORD/000778/2023-2024 857/AE/HQ 06/11/2023 30 MANABSEBA PROKALPA & CONSTRUCTIONS 0.75 0.00 0 100
1602 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of RAIPUR Piped Water Supply Scheme , SM/07865 Retrofitting Different type of works related (Internal pathways and approach road 2nd pump, Land-Development, FHTC, repair of boundary wall & pump houses and road restoration) under RAIPUR PWSS under Burdwan-II Block under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. Junior Engineer, Burdwan Sadar Sub-Division ORD/000374/2024-2025 2995/BWD 01/08/2024 184 PRATIVA CONSTRUCTION 11.79 0.00 0 80
1603 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of RAIPUR Piped Water Supply Scheme , SM/07865 Retrofitting Providing Parall LDS (Node- 20 to 24) for smoothly getting water at Baral village within Raipur PWSS, Bardhhaman-II Development Block under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. Junior Engineer, Burdwan Sadar Sub-Division ORD/001338/2024-2025 1026/BWD 21/03/2025 30 ROY CONSTRUCTION 8.82 0.00 0 0
1604 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of RAIPUR Piped Water Supply Scheme , SM/07865 Retrofitting Different Types of work involved in connection with different Augmentation & New Schemes (11 Nos.) Piped Water Supply Scheme under Burdwan II Block within Burdwan Sub-Div., under Burdwan Division PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/001349/2024-2025 1060/BWD 25/03/2025 120 R.G. INFRASTRUCTURE 262.23 0.00 0 0
1605 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Balarampur Piped Water Supply Scheme at Jamalpur Block , SM/07776 Retrofitting Laying pipeline with FHTC for BALARAMPUR Water Supply Scheme at Matnasipur village (600 Nos) (from near rail gate to matnasipur) and rest portion FHTC work of Berugram village (46 Nos), Balarampur village (40 Nos), Nasipur village (45 Nos), Salimdanga village (15 Nos) within Jamalpur Block, under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000639/2021-2022 1620/BWD 21/03/2022 45 M/S ASHA CONSTRUCTION 47.32 0.00 0 0
1606 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Balarampur Piped Water Supply Scheme at Jamalpur Block , SM/07776 Retrofitting Providing leftout water tap connection in different villages for 100% coverage to make it Sajal Gram from existing distribution system within scheme jurisdiction of different Piped Water Supply Schemes within Jamalpur Block (Paratal-II, Berugram, Abujhati & Chakdighi G.P.) under Burdwan Division, PHE. Dte. (Part-B). AE(HQs),Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JE/RWS/JAMALPUR ORD/000345/2021-2022 40/BWD 05/01/2022 30 PREMANANDA ROY BISWAS 22.68 0.00 0 1
1607 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Balarampur Piped Water Supply Scheme at Jamalpur Block , SM/07776 Retrofitting Providing leftout water tap connection in different villages for 100% coverage to make it Sajal Gram from existing distribution system within scheme jurisdiction of different Piped Water Supply Schemes within Jamalpur Block (Jarogram, Ajhapur, Panchra & Jougram G.P.) under Burdwan Division, PHE. Dte. (Part-A)_2ND CALL. AE(HQs),Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JE/RWS/JAMALPUR ORD/000592/2021-2022 1454/BWD 11/03/2022 30 PREMANANDA ROY BISWAS 18.83 0.00 0 1
1608 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Balarampur Piped Water Supply Scheme at Jamalpur Block , SM/07776 Retrofitting Sinking of 300 X 200mm dia Tube Well 150 mtr. Depth by D.R. Rig method using UPVC pipe (CM) and UPVC Deep Well Screen (RMS) for Augmentation of BALARAMPUR & its adjoining mouzas Piped Water Supply Scheme, Block - Jamalpur, Dist - Purba Bardhaman under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000524/2022-2023 4887/BWD 02/11/2022 30 BIBHUTI SHAW 10.07 9.83 97.62 100
1609 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Balarampur Piped Water Supply Scheme at Jamalpur Block , SM/07776 Retrofitting Material Requisition To Resource Division RTOR000023/2021-2022 423/BWD 20/01/2022 Resource Division 5.50 0.00 0 0
1610 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Balarampur Piped Water Supply Scheme at Jamalpur Block , SM/07776 Retrofitting Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of Balarampur Piped Water Supply Scheme at Balarampur (3 Nos Habitation), Berugram (3 Nos Habitation), Krishnapur (2 Nos Habitation) & Sadipur (3 Nos Habitation Part) Village (Mouza), Jamalpur Block under Burdwan Division, PHE Dte. [Agreement No. 66/2020-2021 OF SE/CC/PHE. DTE.] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. Junior Engineer, R.W.S. Burdwan Sub Division, P.H.E. Dt ORD/000431/2020-2021 5009/BWD 10/12/2020 90 M/S ASHA CONSTRUCTION 100.79 25.68 25.48 0
1611 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Balarampur Piped Water Supply Scheme at Jamalpur Block , SM/07776 Retrofitting Construction of temporary approach road for Boring machine and its accessories at 4th Tube Well site (due to low land) of Balarampur PWSS, Jamalpur Dev. Block Burdwan Sub-Division under Burdwan Division,PHE Dte Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. RWS_JAMALPUR ORD/001089/2023-2024 519/BSD 13/03/2024 15 BIBHUTI SHAW 0.92 0.00 0 100
1612 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Agradwip Piped Water Supply Scheme at Katwa-II Block , SM/07782 Retrofitting Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of AGRADWIP Piped Water Supply Scheme at Agradwip, Babla danga, Gonsaidhowra, Saheb Nagar & Sarawaridhowra (Mouza), Katwa - II Block under Burdwan Division, PHE Dte. Assistant Engineer ORD/000445/2021-2022 6253/BWD 01/11/2021 60 SHUBHRA KANTI GHOSH 53.67 19.01 35.42 1
1613 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Agradwip Piped Water Supply Scheme at Katwa-II Block , SM/07782 Retrofitting Replacement and extension of pipe line from the existing Distribution System within scheme jurisdiction at Agradwip Ghosh para village under AGRADWIP PWSS under Katwa Sub-Division under Burdwan Division PHE Dte.(Sl No-6) Assistant Engineer JUNIOR ENGINEER KATWA SUB-DIVISION PHE DTE ORD/000145/2021-2022 594/KTS 06/09/2021 30 SHUBHRA KANTI GHOSH 3.56 3.56 100 1
1614 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Agradwip Piped Water Supply Scheme at Katwa-II Block , SM/07782 Retrofitting Replacement and extension of pipe line from the existing Distribution System within scheme jurisdiction at Agradwip Gopinath para and Majherpara village under AGRADWIP PWSS under Katwa Sub-Division under Burdwan Division PHE Dte.(Sl No-5) Assistant Engineer JUNIOR ENGINEER KATWA SUB-DIVISION PHE DTE ORD/000144/2021-2022 593/KTS 06/09/2021 30 CHANCHAL PAL 3.47 3.47 100 1
1615 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Agradwip Piped Water Supply Scheme at Katwa-II Block , SM/07782 Retrofitting Replacement and extension of pipe line from the existing Distribution System within scheme jurisdiction at Sahebnagar village under AGRADWIP PWSS under Katwa Sub-Division under Burdwan Division PHE Dte.(Sl No-4) Assistant Engineer JUNIOR ENGINEER KATWA SUB-DIVISION PHE DTE ORD/000143/2021-2022 592/KTS 06/09/2021 30 TAPAS KUMAR ROY 4.84 4.82 99.59 1
1616 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Agradwip Piped Water Supply Scheme at Katwa-II Block , SM/07782 Retrofitting Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of Agradwip Piped Water Supply Scheme at Agradwip (P) village & Kharpur (P) village, Katwa - II Block under Burdwan Division, PHE Dte._Part-B.[Agreement No. 685/BWD OF 2020-2021.] Assistant Engineer JUNIOR ENGINEER KATWA SUB-DIVISION PHE DTE ORD/000305/2020-2021 1511/BWD 19/02/2021 45 SHUBHRA KANTI GHOSH 44.47 34.42 77.4 0
1617 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Agradwip Piped Water Supply Scheme at Katwa-II Block , SM/07782 Retrofitting Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of Agradwip Piped Water Supply Scheme at Agradwip (P) village & Kharpur (P) village, Katwa - II Block under Burdwan Division, PHE Dte._Part-A. [Agreement No. 704/BWD OF 2020-2021] Assistant Engineer JUNIOR ENGINEER KATWA SUB-DIVISION PHE DTE ORD/000323/2020-2021 1567/BWD 22/02/2021 45 KHEPIMA ENGINEERS CO. OPERATIVE SOCIETY LTD. 44.39 43.48 97.95 0
1618 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of BALGANA Piped Water Supply Scheme at Bhatar Block , SM/07871 Retrofitting Continuation work order for Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Balgona village and Balgona Habitation of Balgona piped water supply scheme within Durgapur (Bardhaman North) Sub-Division under Burdwan Division, PHE Dte. [Phase-I] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000635/2020-2021 4333/BWD 05/11/2020 30 S.S. CONSTRUCTION 4.86 0.00 0 1
1619 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of BALGANA Piped Water Supply Scheme at Bhatar Block , SM/07871 Retrofitting Continuation work order for Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Haripur village and Haripur habitation of Balgona piped water supply scheme within Durgapur (Bardhaman North) Sub-Division under Burdwan Division, PHE Dte. [Phase-I] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000697/2020-2021 4334/BWD 05/11/2020 30 S.S. CONSTRUCTION 4.03 0.00 0 1
1620 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of BALGANA Piped Water Supply Scheme at Bhatar Block , SM/07871 Retrofitting Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Balgona village and Balgona habitation of Balgona piped water supply scheme within Durgapur (Bardhaman North) Sub-Division under Burdwan Division, PHE Dte. [Phase-I] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000698/2020-2021 3347/BWD 18/09/2020 30 S.S. CONSTRUCTION 4.86 0.00 0 1
1621 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of BALGANA Piped Water Supply Scheme at Bhatar Block , SM/07871 Retrofitting Sinking of additional 250 X 150mm dia Tube Well 150 mtr. Depth by D.R. Rig method using UPVC pipe (CD) and UPVC Deep Well Screen (RDS) for BALGONA Piped Water Supply Scheme, Block - Bhatar, Dist - Purba Bardhaman under Burdwan Division, PHE Dte. Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000066/2022-2023 2389/BWD 10/05/2022 30 ANIRUDDHA FARUQUE 9.03 7.60 84.16 1
1622 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of BALGANA Piped Water Supply Scheme at Bhatar Block , SM/07871 Retrofitting Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of Balgona Piped Water Supply Scheme at Balgona village (Balgona (P), Patna habs), Bhatar Block under Burdwan Division, PHE Dte. Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000335/2020-2021 1574/BWD 22/02/2021 60 M/S S. CHOUDHURY 63.94 32.40 50.67 1
1623 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of BALGANA Piped Water Supply Scheme at Bhatar Block , SM/07871 Retrofitting Surging of existing Tube Well at Headwork site for Bolgona Water Supply Scheme , Block - Bhatar, Dist - Purba Barddhaman under Durgapur Sub Division, PHE Dte.[SL-C] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000623/2021-2022 164/DSD 16/03/2022 5 J. K. CORPORATION 0.54 0.00 0 1
1624 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of BALGANA Piped Water Supply Scheme at Bhatar Block , SM/07871 Retrofitting Laying of additional pipeline to facilitate FHTC at Patna village of Bolgona and its adjoining mouza's Piped W/S Scheme at Bhatar Block within Durgapur Sub Division under Burdwan Division, P.H.E. Dte. [SL-11] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer, R.W.S. Burdwan Sub Division, P.H.E. Dt ORD/000854/2022-2023 711/DSD 30/12/2022 30 NANGTASWAR CO. OP. LABOUR CONT. AND CONSTRUCTION SOCIETY LTD. 4.09 0.00 0 0
1625 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of BALGANA Piped Water Supply Scheme at Bhatar Block , SM/07871 Retrofitting Extension of pipeline at Patna village of Bolgona and its adjoining mouza's Piped W/S Scheme at Bhatar Block within Durgapur Sub Division under Burdwan Division, P.H.E. Dte. [SL-10] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer, R.W.S. Burdwan Sub Division, P.H.E. Dt ORD/000853/2022-2023 710/DSD 30/12/2022 30 NANGTASWAR CO. OP. LABOUR CONT. AND CONSTRUCTION SOCIETY LTD. 4.65 0.00 0 0
1626 PURBA BARDHAMAN Central Drilling Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of BALGANA Piped Water Supply Scheme at Bhatar Block , SM/07871 Retrofitting Providing Drilling crew and other allied works for construction of Tube well (300mm x 200mm x 120 mtrs. Depth) by utilising Departmental machineries for Balgana W/S Scheme, Bhatar block under Purba Burdwan District, CDD PHE Dte. Driller In Charge Junior Engineer ORD/000010/2023-2024 63/CDD 06/04/2023 30 C.M. ENTERPRISE 9.91 7.52 75.88 100
1627 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of BALGANA Piped Water Supply Scheme at Bhatar Block , SM/07871 Retrofitting WBSEDCL quotation of Balgona piped water supply scheme under Burdwan Division, PHE Dte. [Ref. ID-503447092] BILL/00612/2023-2024 713/JJM 05/10/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LTD. 4.68 0.00 0 0
1628 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of BALGANA Piped Water Supply Scheme at Bhatar Block , SM/07871 Retrofitting Placing of pipeline at "Patna and adj" villages of Balgona and its adjoining mouza's Piped W/S Scheme at Bhatar Block within Durgapur Sub Division under Burdwan Division, P.H.E. Dte. [SL-A] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000120/2022-2023 333/DSD 27/06/2022 15 R.K. ENTERPRISE 1.11 0.00 0 0
1629 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of BALGANA Piped Water Supply Scheme at Bhatar Block , SM/07871 Retrofitting Providing Functional Household Tap Connection (FHTC) by sinking of tube well 250 x 150 mm. dia. (2 Nos.) Constn. of Pump House, Boundary Wall and Land Development within command area of BALGANA & BHATAKUL W/S. Scheme, Bhatar Block under Burdwan Division, PHE. Dte. Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/001188/2024-2025 596/BWD 07/02/2025 120 M/S S.S. ENTERPRISE 114.01 0.00 0 0
1630 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of BALGANA Piped Water Supply Scheme at Bhatar Block , SM/07871 Retrofitting Sinking of additional 300 X 200 mm dia. Tube Well, 420 Mtrs. Depth by D.R. Rig method using UPVC Pipe (CD) and UPVC Deep Well Screen (RDS) for AUGMANTATION of BHATAR & BALGONA Water Supply Scheme within Bhatar Block, Dist.- Purba Bardhaman within Durgapur Sub Division under Burdwan Division PHE Dte. [For 02 Nos. Tube well]. Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer2, Durgapur Sub-Division, PHE Dte. ORD/001092/2023-2024 1125/BWD 14/03/2024 122 KAR CONSTRUCTION AND ORDER SUPPLIERS 58.25 0.00 0 100
1631 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of BALGANA Piped Water Supply Scheme at Bhatar Block , SM/07871 Retrofitting Supply of various D.I. Mechanical joints & specials for Aug. of BHATAR & Aug. of BALGONA Piped W/S. Scheme within Durgapur (Burdwan North) Sub-Division under Burdwan Division, PHE. Dte. [Part-B]. AE(HQs) JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000305/2024-2025 2828/BWD 19/07/2024 216 KEJRIWAL CASTINGS LIMITED 4.82 0.00 0 100
1632 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of BALGANA Piped Water Supply Scheme at Bhatar Block , SM/07871 Retrofitting Supply of various D.I. Mechanical joints & specials for Aug. of BHATAR & Aug. of BALGONA Piped W/S. Scheme within Durgapur (Burdwan North) Sub-Division under Burdwan Division, PHE. Dte. [Part-C]. AE(HQs) JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000309/2024-2025 2832/BWD 19/07/2024 225 JINDAL SAW LTD. 4.63 0.00 0 100
1633 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of BALGANA Piped Water Supply Scheme at Bhatar Block , SM/07871 Retrofitting Supply of various D.I. Mechanical joints & specials for Aug. of BHATAR & Aug. of BALGONA Piped W/S. Scheme within Durgapur (Burdwan North) Sub-Division under Burdwan Division, PHE. Dte. [Part-A]. AE(HQs) JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000316/2024-2025 2840/BWD 19/07/2024 215 ELECTROSTEEL CASTING LIMITED 4.95 0.00 0 100
1634 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting at Sudpur PWSS , SM/06769 Retrofitting Urgent repairing work at Sudpur piped water supply scheme to ensuring FHTC work under Katwa-I Block under Katwa Sub-Division, under Burdwan Division, PHE Dte.[Tr No.-875/BWD/20-21] Assistant Engineer JUNIOR ENGINEER KATWA SUB-DIVISION PHE DTE ORD/000614/2020-2021 91/KTS 12/02/2021 3 HAMID SK 0.92 0.92 100 1
1635 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting at Sudpur PWSS , SM/06769 Retrofitting Extension of pipe line from the existing Distribution System within scheme jurisdiction at Rayerpara, Purba and Paschim Bijoynagar village under SUDPUR PWSS under Katwa Sub-Division under Burdwan Division PHE Dte [Sl - 5 ] Assistant Engineer JUNIOR ENGINEER KATWA SUB-DIVISION PHE DTE ORD/000125/2021-2022 565/KTS 31/08/2021 15 HAMID SK 3.60 0.00 0 1
1636 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting at Sudpur PWSS , SM/06769 Retrofitting Extension of pipe line from the existing Distribution System within scheme jurisdiction at Sudpur, Lokpur & Narayanpur village under SUDPUR PWSS under Katwa Sub-Division under Burdwan Division PHE Dte [Sl - 4 ] Assistant Engineer JUNIOR ENGINEER KATWA SUB-DIVISION PHE DTE ORD/000120/2021-2022 564/KTS 31/08/2021 15 BABUL SK 2.42 0.00 0 1
1637 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting at Sudpur PWSS , SM/06769 Retrofitting Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of SUDPUR Piped Water Supply Scheme (PART-A) at Katwa-I Block under Burdwan Division, PHE Dte. [Agreement No. 44/2020-2021 OF SE/CC/PHE. DTE.] Assistant Engineer ORD/000058/2020-2021 4290/BWD 03/11/2020 90 MD HASIN 86.85 68.84 79.26 1
1638 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting at Sudpur PWSS , SM/06769 Retrofitting Balance work of OHR at Head Work site, construction of HUME Pipe culvert , Road restoration work and boundary wall at 2nd TW site with Gate, land development at Head work site and 2nd TW site under KAITHAN, SUDPUR & PANUHAT Piped Water Supply Scheme under KATWA -I Block, under Katwa Sub-Division within Burdwan Division, PHE Dte. Assistant Engineer JUNIOR ENGINEER KATWA SUB-DIVISION PHE DTE ORD/000486/2024-2025 3141/BWD 20/08/2024 120 VISHAL CONSTRUCTION CO. 126.29 0.00 0 50
1639 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Suhari Piped Water Supply Scheme , SM/07823 Retrofitting Continuation work order for water tap connection in each house hold from existing distribution system within scheme jurisdiction in Purba Krishnapur village of Suhari piped water supply scheme within Burdwan Sub-Division under Burdwan Division, PHE Dte.[Phase-I] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000677/2020-2021 1326/BWD 12/02/2021 30 SAMANTA CONSTRUCTION 4.92 3.50 71.14 1
1640 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Suhari Piped Water Supply Scheme , SM/07823 Retrofitting Providing FHTC (650 Nos.) from dist. System within the command area of SUHARI piped water supply scheme at Masjidpara, Allahadipara, Varpally, Saktigarh Utttar Bazar Habitation (Putunda & Saktigarh Mouza) at Bardhhaman-II Development Block under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000294/2021-2022 7027/BWD 17/12/2021 30 YOUNG ENGINEERS CO.-OPERATIVE SOCIETY LTD. 19.58 19.58 100 1
1641 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Suhari Piped Water Supply Scheme , SM/07823 Retrofitting Providing FHTC in Jarul village for 100% coverage in Sajal Gram from existing distribution system within SUHARI PWSS, Bardhhaman-II Development Block under Burdwan Division, PHE Dte.(Part-A). Gr.K. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000347/2022-2023 1381/BWD 05/08/2022 5 SAMANTA CONSTRUCTION 0.96 0.00 0 0
1642 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Suhari Piped Water Supply Scheme , SM/07823 Retrofitting Providing FHTC in Jarul village for 100% coverage in Sajal Gram from existing distribution system within SUHARI PWSS, Bardhhaman-II Development Block under Burdwan Division, PHE Dte.(Part-B).Gr.L. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000348/2022-2023 1382/BSD 05/08/2022 5 SAMANTA CONSTRUCTION 0.96 0.00 0 0
1643 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Suhari Piped Water Supply Scheme , SM/07823 Retrofitting Providing FHTC in Shuhari village for 100% coverage in Sajal Gram from existing distribution system within SUHARI PWSS, Bardhhaman-II Development Block under Burdwan Division, PHE Dte.(Part-A).Gr.M. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000349/2022-2023 1383/BSD 05/08/2022 5 SAMANTA CONSTRUCTION 0.97 0.00 0 0
1644 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Suhari Piped Water Supply Scheme , SM/07823 Retrofitting Providing FHTC in Shuhari village for 100% coverage in Sajal Gram from existing distribution system within SUHARI PWSS Bardhhaman-II Development Block under Burdwan Division, PHE Dte.(Part-B). Gr.N. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000350/2022-2023 1384/BSD 05/08/2022 5 SAMANTA CONSTRUCTION 0.96 0.00 0 0
1645 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Suhari Piped Water Supply Scheme , SM/07823 Retrofitting Providing FHTC in Atagar village for 100% coverage in Sajal Gram from existing distribution system within SUHARI PWSS Bardhhaman-II Development Block under Burdwan Division, PHE Dte. Gr.O. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000351/2022-2023 1390/BSD 08/08/2022 5 SAMANTA CONSTRUCTION 0.56 0.00 0 0
1646 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Suhari Piped Water Supply Scheme , SM/07823 Retrofitting Construction of Pump House cum chlorine room without sanitary and water supply arrangement at Tube Well Site to departmental drawing no-PHE/BD/P.H/DRG/02/DEC-17(Size 3.60 mtr x 3.00 mtr room) for SUHARI its Adjoining Mouza W/S Scheme, Block -Bardhaman-II within Burdwan Sub-Division, PHE Dte. (Mouza- PURBA KRISHNAPUR) Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000767/2022-2023 502/BSD 21/03/2023 45 M/S PALASH BISWAS 3.45 2.83 82.03 100
1647 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Suhari Piped Water Supply Scheme , SM/07823 Retrofitting Providing leftout water tap connection in different villages for 100% coverage in Sajal Gram from existing distribution system within scheme jurisdiction of different Piped Water Supply Schemes within Burdwan ¿ II Block under Burdwan Division, PHE. Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000416/2021-2022 385/BWD 20/01/2022 30 BISWAS ENTERPRISE 11.97 1.50 12.53 100
1648 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Suhari Piped Water Supply Scheme , SM/07823 Retrofitting Providing functional household tap connection (FHTC) from existing distribution system within the command area of Suhari piped water supply scheme at Putunda, Atagarh (08 Nos. Habitation), Ghatshila (04 Nos. Habitation), Jarur (02 Nos. Habitation), Saiadpur Chak, Tajpur (04 Nos. Habitation) village, Bardhaman-II Block under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. Junior Engineer, Burdwan Sadar Sub-Division ORD/000529/2020-2021 5004/BWD 10/12/2020 90 NATIONAL CONSTRUCTION 80.78 15.48 19.16 0
1649 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Suhari Piped Water Supply Scheme , SM/07823 Retrofitting Designing, Making and Erection of Sign Board for SAJAL GRAM in Tajpur Village, Burdwan - II Block within Suhari PWSS under Burdwan Division, PHE Dte. (5 Nos Board) AE(HQs) J.E. 1 BURDWAN ORD/000773/2023-2024 853/AE/HQ 06/11/2023 30 MANABSEBA PROKALPA & CONSTRUCTIONS 0.75 0.00 0 100
1650 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Suhari Piped Water Supply Scheme , SM/07823 Retrofitting Providing FHTC for 100% coverage in different village (SUHARI, JARUL, ATTAGAR & GHATSHILA) from existing distribution system within SUHARI PWSS, Bardhhaman-II Development Block under Burdwan Division, PHE Dte._2ND CALL Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. Junior Engineer, Burdwan Sadar Sub-Division ORD/000572/2023-2024 3722/BWD 25/08/2023 30 BIPLAB SAMANTA 18.91 0.00 0 100
1651 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Suhari Piped Water Supply Scheme , SM/07823 Retrofitting Providing laying distribution pipe line due to shal balla pileing at Sontoshpur village by P.Samiti for SUHARI PWSS at Bardhhaman-II Development Block under Burdwan Division,PHE Dte Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. Junior Engineer, Burdwan Sadar Sub-Division ORD/001178/2023-2024 537/BSD 14/03/2024 30 M/S PALASH BISWAS 0.89 0.00 0 100
1652 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Suhari Piped Water Supply Scheme , SM/07823 Retrofitting Allied work for inter connection between 3rd tube well site and laying distribution system for Suhari PWSS within Bardhaman-II Block , under Burdwan Division, PHE Dte Junior Engineer, Burdwan Sadar Sub-Division ORD/000292/2024-2025 1274/BSD 12/07/2024 7 ISHAN CONSTRUCTION 2.34 0.00 0 100
1653 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Suhari Piped Water Supply Scheme , SM/07823 Retrofitting Providing left out FHTC for Putunda village within SUHARI PWSS , Bardhhaman-II Development Block under Burdwan Division, PHE Dte Junior Engineer, Burdwan Sadar Sub-Division ORD/000144/2024-2025 1032/BSD 10/06/2024 30 ISHAN CONSTRUCTION 0.96 0.00 0 100
1654 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Suhari Piped Water Supply Scheme , SM/07823 Retrofitting Different type of works related (Toilet, Drain, Internal pathways, Land-Development, repair of boundary wall &pump houses and road restoration) under SUHARI PWSS under Burdwan-II Block under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/001030/2024-2025 144/BWD 08/01/2025 90 M/S PALASH BISWAS 17.92 0.00 0 0
1655 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Suhari Piped Water Supply Scheme , SM/07823 Retrofitting Allied work for providing left out FHTC for Putunda village within SUHARI PWSS,Bardhha under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. Junior Engineer, Burdwan Sadar Sub-Division ORD/001287/2024-2025 508/BSD 06/03/2025 23 ISHAN CONSTRUCTION 0.96 0.00 0 100
1656 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Suhari Piped Water Supply Scheme , SM/07823 Retrofitting Different Types of work involved in connection with different Augmentation & New Schemes (11 Nos.) Piped Water Supply Scheme under Burdwan II Block within Burdwan Sub-Div., under Burdwan Division PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/001349/2024-2025 1060/BWD 25/03/2025 120 R.G. INFRASTRUCTURE 262.23 0.00 0 0
1657 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Uttar Radhakantapur Piped Water Supply Scheme at Memari-II Block , SM/07830 Retrofitting Extension of pipeline for UTTAR RADHAKANTAPUR Piped Water Supply Scheme at Radhakantapur High School Kantagorer Par [23 Nos],Total 23 Nos FHTC Work for Sajal Gram (As per Field Verification Report for Har Ghar Jal Certification) within Memari-I Block including leftout household water tap connection(FHTC)under Burdwan Division,PHE Dte. Gr.U Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000337/2022-2023 1365/BSD 04/08/2022 5 D.M. ENTERPRISE 0.97 0.00 0 1
1658 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Uttar Radhakantapur Piped Water Supply Scheme at Memari-II Block , SM/07830 Retrofitting Extension of pipeline for UTTAR RADHAKANTAPUR Piped water Supply Scheme at Harirambati[7 Nos],Kamalpur[4 Nos],Kole[5 Nos],Mallikapur[2 Nos],Sahanagar[5 Nos]Total 23 Nos FHTC Work for Sajal Gram(As per Resulation taken in Special Gram Sava on 01-08-2022 within Memari-I Block including leftout household water tap connection(FHTC)under Burdwan Division,PHE Dte.Gr.D. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000336/2022-2023 1359/BSD 03/08/2022 5 D.M. ENTERPRISE 0.96 0.00 0 1
1659 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Uttar Radhakantapur Piped Water Supply Scheme at Memari-II Block , SM/07830 Retrofitting Extension of pipeline for UTTAR RADHAKANTAPUR Piped Water Supply Scheme at Radhakantapur Purbo Sansad Dule Para(23 Nos)Total 23 Nos FHTC Work for Sajal Gram(As per Field Verification Report for Har Ghar Jal Certification and praved for Prodhan of Gop Ganter-II G.P. within Memari-I Block including leftout household water tap connection(FHTC)under Burdwan Division,PHE Dte. Gr.V Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000338/2022-2023 1366/BSD 04/08/2022 5 D.M. ENTERPRISE 0.97 0.00 0 1
1660 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Uttar Radhakantapur Piped Water Supply Scheme at Memari-II Block , SM/07830 Retrofitting Extension of pipeline for UTTAR RADHAKANTAPUR Piped Water Supply Scheme at Harirambati [7 No's], Kamalpur [4 No's], Kole [5 No's] Mallikapur [2 No's], Sahanagar [5 No's]Total 23 No's FHTC Work for Sajal Gram (As per Resulation taken in Special Gram Sava on 01-08-2022 within Memari-I Block including leftout household water tap connection (FHTC) under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000647/2022-2023 1359-A/BSD 03/08/2022 5 D.M. ENTERPRISE 0.96 0.96 100 1
1661 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Uttar Radhakantapur Piped Water Supply Scheme at Memari-II Block , SM/07830 Retrofitting Extension of pipeline for UTTAR RADHAKANTAPUR Piped Water Supply Scheme at Radhakantapur High School Kantagorer Par [23 Nos] Total 23 No's FHTC Work for Sajal Gram (As per Field Verification Report for Har Ghar Jal Certification within Memari-I Block including leftout household water tap connection (FHTC) under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000651/2022-2023 1365-A/BSD 04/08/2022 5 D.M. ENTERPRISE 0.97 0.97 100 1
1662 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Uttar Radhakantapur Piped Water Supply Scheme at Memari-II Block , SM/07830 Retrofitting Extension of pipeline for UTTAR RADHAKANTAPUR Piped Water Supply Scheme at Radhakantapur Purbo Sansad Dule Para[23 No's] Total 23 No's FHTC Work for Sajal Gram (As per Field Verification Report for Har Ghar Jal Certification within Memari-I Block including leftout household water tap connection (FHTC) under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000652/2022-2023 1366-A/BSD 04/08/2022 5 D.M. ENTERPRISE 0.97 0.97 100 1
1663 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Uttar Radhakantapur Piped Water Supply Scheme at Memari-II Block , SM/07830 Retrofitting Providing leftout water tap connection in different villages for 100% coverage to make it Sajal Gram from existing distribution system within scheme jurisdiction of different Piped Water Supply Schemes within Memari-I Block (Daluibazar-II, Gopegantar-I & II G.P.) under Burdwan Division, PHE. Dte. Dte._Part-A. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000371/2021-2022 209/BWD 11/01/2022 30 M/S ANAND CONSTRUCTION 21.11 0.00 0 1
1664 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Uttar Radhakantapur Piped Water Supply Scheme at Memari-II Block , SM/07830 Retrofitting Designing, Making and Erection of Sign Board for SAJAL GRAM in Purba Shrirampur Village, Memari - II Block within Uttar Radhakantapur PWSS under Burdwan Division, PHE Dte. (5 Nos Board) AE(HQs) J.E. 1 BURDWAN ORD/000742/2023-2024 837/AE/HQ 31/10/2023 30 MUNSHI JAVEDUR JAMAN 0.76 0.36 47.37 100
1665 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Uttar Radhakantapur Piped Water Supply Scheme at Memari-II Block , SM/07830 Retrofitting Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of UTTAR RADHAKANTAPUR Piped Water Supply Scheme at Uttar Radhakantapur, Patra, Katna etc village mouza, Memari-I Block under BURDWAN Division, P.H.E Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. Junior Engineer, RWS, Memari-I Dev. Bolck ORD/000590/2023-2024 3763/BWD 29/08/2023 30 DEY NIRMAN 13.95 0.00 0 75
1666 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Uttar Radhakantapur Piped Water Supply Scheme at Memari-II Block , SM/07830 Retrofitting Designing, Making and Erection of Sign Board for SAJAL GRAM in Kamalpur Village, Memari - I Block within Uttar Radhakantapur PWSS under Burdwan Division, PHE Dte. (5 Nos Board) AE(HQs) J.E. 1 BURDWAN ORD/000785/2023-2024 862/AE/HQ 06/11/2023 30 MANABSEBA PROKALPA & CONSTRUCTIONS 0.75 0.00 0 100
1667 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Uttar Radhakantapur Piped Water Supply Scheme at Memari-II Block , SM/07830 Retrofitting Designing, Making and Erection of Sign Board for SAJAL GRAM in Balidanga Village, Memari - I Block within Uttar Radhakantapur PWSS under Burdwan Division, PHE Dte. (5 Nos Board) AE(HQs) J.E. 1 BURDWAN ORD/000786/2023-2024 863/AE/HQ 06/11/2023 30 MANABSEBA PROKALPA & CONSTRUCTIONS 0.75 0.00 0 100
1668 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Uttar Radhakantapur Piped Water Supply Scheme at Memari-II Block , SM/07830 Retrofitting Designing, Making and Erection of Sign Board for SAJAL GRAM in Mallikpur Village, Memari - I Block within Uttar Radhakantapur PWSS under Burdwan Division, PHE Dte. (5 Nos Board) AE(HQs) J.E. 1 BURDWAN ORD/000781/2023-2024 859/AE/HQ 06/11/2023 30 MANABSEBA PROKALPA & CONSTRUCTIONS 0.75 0.00 0 100
1669 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Uttar Radhakantapur Piped Water Supply Scheme at Memari-II Block , SM/07830 Retrofitting Designing, Making and Erection of Sign Board for SAJAL GRAM in Sahanagar Village, Memari - I Block within Uttar Radhakantapur PWSS under Burdwan Division, PHE Dte. (5 Nos Board) AE(HQs) J.E. 1 BURDWAN ORD/000782/2023-2024 860/AE/HQ 06/11/2023 30 MANABSEBA PROKALPA & CONSTRUCTIONS 0.75 0.00 0 100
1670 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Uttar Radhakantapur Piped Water Supply Scheme at Memari-II Block , SM/07830 Retrofitting Extension of PVC Water supply line at Koley village for UTTAR RADHAKANTAPUR and its adjoining mouza W/S Scheme Block:Memari-I within Burdwan Sub-Division,PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER RWS BURDWAN SUB-DIVISION PHE DTE,Junior Engineer, RWS, Memari-I Dev. Bolck ORD/001012/2023-2024 120/BSD 18/01/2024 30 A R TRADERS 0.92 0.00 0 98
1671 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Uttar Radhakantapur Piped Water Supply Scheme at Memari-II Block , SM/07830 Retrofitting Restoration of concrete road by Cement concrete (mix 1:1.5:3), Providing balance FHTC, parallel pipeline, drainage system, boundary wall, Bridge, land development, Sluice valve chamber for smooth water supply of FHTC work for UTTAR RADHAKANTAPUR PWSS and its adjoining mouzas within MEMARI-I BLOCK under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/001164/2024-2025 556/BWD 05/02/2025 90 SANDIP SARKAR 14.45 0.00 0 0
1672 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Masagram Piped Water Supply Scheme at Jamalpur Block , SM/07815 Retrofitting Extension of UPVC distribution pipeline in connection with FHTC for Masagram (Zone-I) & adjoining mouzas water supply scheme at Jamalpur Development Block under Burdwan Division, PHE Dte.[Gr.-B] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000419/2021-2022 1112/BSD 23/08/2021 45 M/S ASHA CONSTRUCTION 4.71 4.71 100 1
1673 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Masagram Piped Water Supply Scheme at Jamalpur Block , SM/07815 Retrofitting Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of Masagram Piped Water Supply Scheme at Habaspur Village, Chouberia Village, Ballabhbati Village & Masagram (4 Nos. habitations), Jamalpur Block under Burdwan Division, PHE Dte. (Agr. No. 710/BWD of 2020-2021) Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000342/2020-2021 1578/BWD 22/02/2021 60 MD HASIN 60.21 51.15 84.95 1
1674 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Masagram Piped Water Supply Scheme at Jamalpur Block , SM/07815 Retrofitting Extension of pipe linefor providing functional house hold tap connection at Sanchra habitation(Part)of MOSAGRAM ZONE-II Piped Water Supply Schemewithin Burdwan Sub-Divn under Burdwan Division,PHE Dte". Group : E. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000104/2022-2023 987/BSD 16/06/2022 30 MD HASIN 2.51 2.51 100 1
1675 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Masagram Piped Water Supply Scheme at Jamalpur Block , SM/07815 Retrofitting Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of Masagram Piped Water Supply Scheme at Dadpur Village, Sarangpur Village (2Nos. habitations) & Sanchra Village, Jamalpur Block under Burdwan Division, PHE Dte.(Agreement No. 753/BWD of 2020-2021) Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000437/2020-2021 1599/BWD 22/02/2021 60 M/S ASHA CONSTRUCTION 65.00 63.88 98.28 1
1676 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Masagram Piped Water Supply Scheme at Jamalpur Block , SM/07815 Retrofitting Construction of Boundary Wall at 2nd T/W Site of Masagram Zone-I Water Supply Scheme under Jamalpur Block of Burdwan Division, PHE Dte (Length-50.0 Mtr,Col-17 Nos). Gr.E. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000443/2021-2022 201/BSD 01/02/2022 45 SANDIPAN SENGUPTA 3.12 0.00 0 1
1677 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Masagram Piped Water Supply Scheme at Jamalpur Block , SM/07815 Retrofitting Extension of UPVC distribution pipeline in connection with FHTC for Masagram (Zone-II) and its adjoining mouzas water supply scheme at Jamalpur Development Block under Burdwan Division, PHE Dte. (Habaspur Habitation) [Gr.-A] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000535/2021-2022 1206/BSD 09/09/2021 30 MD HASIN 4.85 4.84 99.79 1
1678 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Masagram Piped Water Supply Scheme at Jamalpur Block , SM/07815 Retrofitting Laying of 200mm.dia. HDPE Distribution pipe line (Node No.118 to 119) for Masagram (Zone-I) & adjoining mouzas Water Supply Scheme at Jamalpur Development block under Burdwan Division,PHE Dte. Group : C. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000090/2022-2023 830/BSD 23/05/2022 30 M/S ASHA CONSTRUCTION 4.60 0.00 0 1
1679 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Masagram Piped Water Supply Scheme at Jamalpur Block , SM/07815 Retrofitting Re-laying of UPVC Pipeline(Damaged by Irrigation Department)and repairing damaged FHTC at Masagram Mouza (Habitation) under Masagram Zone-I Piped Water Supply Scheme Jamalpur Development under Burdwan Division,PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. RWS_JAMALPUR ORD/000183/2023-2024 1007/BSD 06/06/2023 15 DEBASHISH ENTERPRISE 0.85 0.42 49.41 100
1680 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Masagram Piped Water Supply Scheme at Jamalpur Block , SM/07815 Retrofitting Re-laying of u-PVC Pipeline damaged by Irrigation department at Sanchra village of Masagram Zone-II Piped W/S Scheme at Jamalpur Development Block under Burdwan Division,PHE Dte ORD/001130/2023-2024 127/BSD 18/01/2024 30 DHIRENDRANATH SOM 0.85 0.00 0 0
1681 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Masagram Piped Water Supply Scheme at Jamalpur Block , SM/07815 Retrofitting Construction of Approach P.C.C Road & Circular Soak Well At Head works site of MASAGRAM Zone-II Piped W/S. Scheme at Jamalpur Dev. Block under Burdwan Division, PHE Dte._2ND CALL Junior Engineer, Burdwan Division ORD/000837/2024-2025 966/AE/HQ 22/11/2024 30 SOUMYAVASH DAS 0.93 0.00 0 0
1682 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Masagram Piped Water Supply Scheme at Jamalpur Block , SM/07815 Retrofitting Sinking of 300 mm X 200 mm dia Tube Well 150 mtr. Depth by D.R. Rig method using UPVC pipe (CM) and UPVC Medium Well Screen (RMS) with construction of Pump House, Boundary wall, Land Development and Rising main connection of MASAGRAM (Zone-II) Piped Water Supply Scheme, Block- Jamalpur, District:- Purba-Bardhaman under Burdwan Division PHE Dte. [FOR 3rd. TUBE WELL SITE]. AE(HQs) Junior Engineer, Burdwan Division ORD/001042/2023-2024 785/BWD 27/02/2024 187 SUSUNIA GP CO. OPERATIVE LABOUR CONTRACT AND CONSTRUCTION SOCIETY LTD. 25.80 0.00 0 40
1683 PURBA BARDHAMAN Burdwan Division Augmentation of ground water based SINGI PWSS to accommodate FHTC in Katwa-II block under Katwa Sub Division of Burdwan Division in Purba Bardhaman District , SM/09412 Augmentation Route Survey and preparation of DPR for SINGHI PWSS under Katwa -II Block under Katwa Sub-Division under Burdwan Division PHE Dte. [Sl No-03] Assistant Engineer ORD/000539/2021-2022 54/KTS 25/01/2022 21 RADIANT 2.81 2.81 100 1
1684 PURBA BARDHAMAN Burdwan Division Augmentation of ground water based SINGI PWSS to accommodate FHTC in Katwa-II block under Katwa Sub Division of Burdwan Division in Purba Bardhaman District , SM/09412 Augmentation Supply of materials for different water supply scheme under Burdwan Division, PHE Dte. VCH/001578/2021-2022 1207/DW 10/03/2022 EXECUTIVE ENGINEER, RESOURCES DIVISION, P.H.E. DTE. 3,005.00 0.00 0 0
1685 PURBA BARDHAMAN Burdwan Division Augmentation of ground water based SINGI PWSS to accommodate FHTC in Katwa-II block under Katwa Sub Division of Burdwan Division in Purba Bardhaman District , SM/09412 Augmentation Material Requisition To Resource Division RTOR000150/2021-2022 1239/BWD 07/03/2022 Resource Division 4.33 0.00 0 0
1686 PURBA BARDHAMAN Burdwan Division Augmentation of ground water based SINGI PWSS to accommodate FHTC in Katwa-II block under Katwa Sub Division of Burdwan Division in Purba Bardhaman District , SM/09412 Augmentation Material Requisition To Resource Division RTOR000050/2021-2022 566/BWD 27/01/2022 Resource Division 22.48 0.00 0 0
1687 PURBA BARDHAMAN Burdwan Division Augmentation of ground water based SINGI PWSS to accommodate FHTC in Katwa-II block under Katwa Sub Division of Burdwan Division in Purba Bardhaman District , SM/09412 Augmentation Material Requisition To Resource Division RTOR000158/2021-2022 1318/BWD 08/03/2022 Resource Division 23.18 0.00 0 0
1688 PURBA BARDHAMAN Burdwan Division Augmentation of ground water based SINGI PWSS to accommodate FHTC in Katwa-II block under Katwa Sub Division of Burdwan Division in Purba Bardhaman District , SM/09412 Augmentation Material Requisition To Resource Division RTOR000200/2021-2022 1523/BWD 15/03/2022 Resource Division 0.37 0.00 0 0
1689 PURBA BARDHAMAN Burdwan Division Augmentation of ground water based SINGI PWSS to accommodate FHTC in Katwa-II block under Katwa Sub Division of Burdwan Division in Purba Bardhaman District , SM/09412 Augmentation Augmentation of Laying Distribution and Rising main Network and Construction of 250 Cum capacity 20 Mtr. staging height RCC Over Head Reservoir including Soil Investigation and pipe connection with cost of pipes, specials and Providing Functional Household Tap Connection (FHTC) from distribution system within the command area of SINGHI Piped Water Supply Scheme under JAL SWAPNA MISSION under Katwa II Block in Purba Bardhaman District under Burdwan Division, PHE. Dte. Assistant Engineer JUNIOR ENGINEER KATWA SUB-DIVISION PHE DTE ORD/000020/2022-2023 2014/BWD 18/04/2022 683 SATYANARAYAN ENGINEERS CO. OP. SOCIETY LTD. 465.17 180.39 38.78 95
1690 PURBA BARDHAMAN Burdwan Division DETAILED PROJECT REPORT FOR AUGMENTATION SAMUDRAGARH PWSS FOR PROVIDING FUNCTIONAL HOUSEHOLD TAP CONNECTION (FHTC) BLOCK PURBASTHALI-I PURBA BARDHAMAN WEST BENGAL , SM/09409 Augmentation Supply of materials for different water supply scheme under Burdwan Division, PHE Dte. VCH/001578/2021-2022 1207/DW 10/03/2022 EXECUTIVE ENGINEER, RESOURCES DIVISION, P.H.E. DTE. 3,005.00 0.00 0 0
1691 PURBA BARDHAMAN Burdwan Division DETAILED PROJECT REPORT FOR AUGMENTATION SAMUDRAGARH PWSS FOR PROVIDING FUNCTIONAL HOUSEHOLD TAP CONNECTION (FHTC) BLOCK PURBASTHALI-I PURBA BARDHAMAN WEST BENGAL , SM/09409 Augmentation Supply and delivery of different dia. CIDF sluice valve for Augmentation of SAMUDRAGARH Piped Water Supply Scheme under Burdwan Division, P.H.E. Dte.SL. No. 10 Assistant Engineer ORD/000636/2021-2022 144/AE/HQ 16/03/2022 10 MA SARADA ENTERPRISE 4.52 4.52 100 1
1692 PURBA BARDHAMAN Burdwan Division DETAILED PROJECT REPORT FOR AUGMENTATION SAMUDRAGARH PWSS FOR PROVIDING FUNCTIONAL HOUSEHOLD TAP CONNECTION (FHTC) BLOCK PURBASTHALI-I PURBA BARDHAMAN WEST BENGAL , SM/09409 Augmentation Preparation of DPR for augmentation of Samudragarh W/S Scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. (Sl No-E) Assistant Engineer ORD/000583/2021-2022 217/KSD 24/02/2022 21 M/S R. DUTTA & CO. 2.80 2.78 99.29 1
1693 PURBA BARDHAMAN Burdwan Division DETAILED PROJECT REPORT FOR AUGMENTATION SAMUDRAGARH PWSS FOR PROVIDING FUNCTIONAL HOUSEHOLD TAP CONNECTION (FHTC) BLOCK PURBASTHALI-I PURBA BARDHAMAN WEST BENGAL , SM/09409 Augmentation Additional works to implement the augmentation of SAMUDRAGARH Piped Water Supply Scheme under Purbasthali-I Block, Dist :- Purba Burdwan under Burdwan Division, PHE. Dte. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000016/2023-2024 1731/BWD 13/04/2023 30 AZAD CONSTRUCTION 18.67 15.24 81.63 100
1694 PURBA BARDHAMAN Burdwan Division DETAILED PROJECT REPORT FOR AUGMENTATION SAMUDRAGARH PWSS FOR PROVIDING FUNCTIONAL HOUSEHOLD TAP CONNECTION (FHTC) BLOCK PURBASTHALI-I PURBA BARDHAMAN WEST BENGAL , SM/09409 Augmentation Material Requisition To Resource Division RTOR000109/2021-2022 930/BWD 16/02/2022 Resource Division 22.00 0.00 0 0
1695 PURBA BARDHAMAN Burdwan Division DETAILED PROJECT REPORT FOR AUGMENTATION SAMUDRAGARH PWSS FOR PROVIDING FUNCTIONAL HOUSEHOLD TAP CONNECTION (FHTC) BLOCK PURBASTHALI-I PURBA BARDHAMAN WEST BENGAL , SM/09409 Augmentation Material Requisition To Resource Division RTOR000208/2021-2022 1531/BWD 15/03/2022 Resource Division 0.37 0.00 0 0
1696 PURBA BARDHAMAN Burdwan Division DETAILED PROJECT REPORT FOR AUGMENTATION SAMUDRAGARH PWSS FOR PROVIDING FUNCTIONAL HOUSEHOLD TAP CONNECTION (FHTC) BLOCK PURBASTHALI-I PURBA BARDHAMAN WEST BENGAL , SM/09409 Augmentation Material Requisition To Resource Division RTOR000041/2021-2022 540/BWD 27/01/2022 Resource Division 20.81 0.00 0 0
1697 PURBA BARDHAMAN Burdwan Division DETAILED PROJECT REPORT FOR AUGMENTATION SAMUDRAGARH PWSS FOR PROVIDING FUNCTIONAL HOUSEHOLD TAP CONNECTION (FHTC) BLOCK PURBASTHALI-I PURBA BARDHAMAN WEST BENGAL , SM/09409 Augmentation Quotation charges of WBSEDCL of Aug. of Samudragarh PWSS. [Ref. ID-503495985] BILL/01124/2023-2024 1087/JJM 20/12/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LTD. 4.42 0.00 0 0
1698 PURBA BARDHAMAN Burdwan Division DETAILED PROJECT REPORT FOR AUGMENTATION SAMUDRAGARH PWSS FOR PROVIDING FUNCTIONAL HOUSEHOLD TAP CONNECTION (FHTC) BLOCK PURBASTHALI-I PURBA BARDHAMAN WEST BENGAL , SM/09409 Augmentation Quotation charges of WBSEDCL of Aug. of Samudragarh PWSS. [Ref. ID-503564676][TW-4] BILL/01690/2023-2024 1366/JJM 20/02/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LTD. 7.35 0.00 0 0
1699 PURBA BARDHAMAN Burdwan Division DETAILED PROJECT REPORT FOR AUGMENTATION SAMUDRAGARH PWSS FOR PROVIDING FUNCTIONAL HOUSEHOLD TAP CONNECTION (FHTC) BLOCK PURBASTHALI-I PURBA BARDHAMAN WEST BENGAL , SM/09409 Augmentation Quotation from WBSEDCL for load enhancement of Augmentation of Samudragarh w/s scheme for P.H.-3 under Burdwan Division, PHE Dte. BILL/01928/2023-2024 1825/JJM 27/03/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LTD. 0.39 0.00 0 0
1700 PURBA BARDHAMAN Burdwan Division DETAILED PROJECT REPORT FOR AUGMENTATION SAMUDRAGARH PWSS FOR PROVIDING FUNCTIONAL HOUSEHOLD TAP CONNECTION (FHTC) BLOCK PURBASTHALI-I PURBA BARDHAMAN WEST BENGAL , SM/09409 Augmentation Augmentation of SAMUDRAGARH Piped Water Supply Scheme with LDS, FHTC, Rising Main, Construction of 450 Cum capacity OHR with 20.0 Mtr. Staging height inclusive of soil investigation including with construction of boundary wall at Head works site under Purbasthali I Block, District - Purba Bardhaman. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000015/2022-2023 1963/BWD 12/04/2022 360 AZAD ENTERPRISE 426.18 262.64 61.63 80
1701 PURBA BARDHAMAN Burdwan Division DETAILED PROJECT REPORT FOR AUGMENTATION SAMUDRAGARH PWSS FOR PROVIDING FUNCTIONAL HOUSEHOLD TAP CONNECTION (FHTC) BLOCK PURBASTHALI-I PURBA BARDHAMAN WEST BENGAL , SM/09409 Augmentation Additional work for Sinking of Tube Well, Construction of Pump House, boundary wall, Providing FHTC & additional pipeline of SAMUDRAGARH Water Supply Scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000540/2023-2024 3660/BWD 22/08/2023 120 JAHAR GHOSH 78.52 19.82 25.24 90
1702 PURBA BARDHAMAN Burdwan Division Augmentation of SINHARI PWSS for providing functional household tap conncetion FHTC in Purbasthali-II block under Burdwan Division in Purba Bardhaman District , SM/09410 Augmentation Supply of materials for different water supply scheme under Burdwan Division, PHE Dte. VCH/001578/2021-2022 1207/DW 10/03/2022 EXECUTIVE ENGINEER, RESOURCES DIVISION, P.H.E. DTE. 3,005.00 0.00 0 0
1703 PURBA BARDHAMAN Burdwan Division Augmentation of SINHARI PWSS for providing functional household tap conncetion FHTC in Purbasthali-II block under Burdwan Division in Purba Bardhaman District , SM/09410 Augmentation Preparation of DPR for augmentation of Sinhari W/S Scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. (Sl No-C) Assistant Engineer ORD/000581/2021-2022 215/KSD 24/02/2022 21 LEMNISCATE 2.92 2.86 97.95 1
1704 PURBA BARDHAMAN Burdwan Division Augmentation of SINHARI PWSS for providing functional household tap conncetion FHTC in Purbasthali-II block under Burdwan Division in Purba Bardhaman District , SM/09410 Augmentation Sinking of additional 250 X 150mm dia Tube Well 150 mtr. Depth by D.R. Rig method using UPVC pipe (CD) and UPVC Deep Well Screen (RDS) for SINHARI Piped Water Supply Scheme, Block - Purbasthali - II, Dist - Purba Bardhaman under Burdwan Division, PHE Dte. Assistant Engineer ORD/000071/2022-2023 2425/BWD 11/05/2022 30 M/S SYCHROTECH INDUSTRY 9.01 0.00 0 0
1705 PURBA BARDHAMAN Central Mechanical Augmentation of SINHARI PWSS for providing functional household tap conncetion FHTC in Purbasthali-II block under Burdwan Division in Purba Bardhaman District , SM/09410 Augmentation Supply & Installation of Submersible Pumping Machinery , Voltage Stabilizer, Chlorination system and internal House wiring for Tube well no.- 1,2 &3 at Augumentation of Sinhari Water Supply Scheme under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000078/2023-2024 2574/CMD 06/06/2023 30 P.K. ENGINEERING 33.08 0.00 0 0
1706 PURBA BARDHAMAN Burdwan Division Augmentation of SINHARI PWSS for providing functional household tap conncetion FHTC in Purbasthali-II block under Burdwan Division in Purba Bardhaman District , SM/09410 Augmentation Material Requisition To Resource Division RTOR000039/2021-2022 539/BWD 27/01/2022 Resource Division 16.89 0.00 0 0
1707 PURBA BARDHAMAN Burdwan Division Augmentation of SINHARI PWSS for providing functional household tap conncetion FHTC in Purbasthali-II block under Burdwan Division in Purba Bardhaman District , SM/09410 Augmentation Material Requisition To Resource Division RTOR000161/2021-2022 1321/BWD 08/03/2022 Resource Division 44.30 0.00 0 0
1708 PURBA BARDHAMAN Burdwan Division Augmentation of SINHARI PWSS for providing functional household tap conncetion FHTC in Purbasthali-II block under Burdwan Division in Purba Bardhaman District , SM/09410 Augmentation Material Requisition To Resource Division RTOR000213/2021-2022 1536/BWD 15/03/2022 Resource Division 0.37 0.00 0 0
1709 PURBA BARDHAMAN Burdwan Division Augmentation of SINHARI PWSS for providing functional household tap conncetion FHTC in Purbasthali-II block under Burdwan Division in Purba Bardhaman District , SM/09410 Augmentation Material Requisition To Resource Division RTOR000153/2021-2022 1241/BWD 07/03/2022 Resource Division 4.19 0.00 0 0
1710 PURBA BARDHAMAN Burdwan Division Augmentation of SINHARI PWSS for providing functional household tap conncetion FHTC in Purbasthali-II block under Burdwan Division in Purba Bardhaman District , SM/09410 Augmentation Augmentation of SINHARI Piped Water Supply Scheme with LDS, FHTC, Rising Main, Construction of 350 Cum capacity OHR with 20.0 Mtr. Staging height inclusive of soil investigation including construction of switch room (3.60mx3.0m) for new TW site under Purbasthali II Block, District - Purba Bardhaman. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000010/2022-2023 1940/BWD 11/04/2022 360 CONCORD ENGINEERING 441.10 292.72 66.36 60
1711 PURBA BARDHAMAN Burdwan Division Augmentation of SINHARI PWSS for providing functional household tap conncetion FHTC in Purbasthali-II block under Burdwan Division in Purba Bardhaman District , SM/09410 Augmentation Conducting physical Household Survey at the IMIS reported village for HGJ certification and providing balance FHTC for Har Ghar Jal certification including conducting Gram Sabhas for different IMIS reported villages across the district under Burdwan Division, PHE Dte. AE(HQs),Assistant Engineer ,Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE.,Assistant Engineer, Durgapur Sub Division, P.H.E. Dte JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000428/2024-2025 3107/BWD 12/08/2024 90 TUBGRAM GRAMMYAK UNNAYAN SAMITY 309.60 0.00 0 50
1712 PURBA BARDHAMAN Burdwan Division Augmentation of SINHARI PWSS for providing functional household tap conncetion FHTC in Purbasthali-II block under Burdwan Division in Purba Bardhaman District , SM/09410 Augmentation Different types of works involve in connection with Augmentation of KRISHNABATI (SM/07827), PURBASTHLI (SM/07866), SINHARI (SM/09716) & SURFACE based W/S Scheme (SM/15571) Piped water supply scheme under Purbasthali-II Block, Kalna Sub-Division, PHE Dte. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000181/2024-2025 2296/BWD 20/06/2024 360 M/S DATTA ENTERPRISE 579.85 0.00 0 2
1713 PURBA BARDHAMAN Burdwan Division Augmentation of SINHARI PWSS for providing functional household tap conncetion FHTC in Purbasthali-II block under Burdwan Division in Purba Bardhaman District , SM/09410 Augmentation Construction of 350cum OHR & Other Allied Works in connection with Augmentation of (SM/07803), (SM/09410), (SM/16304), (SM/15172) & (SM/14020) Piped Water Supply Scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/001048/2024-2025 220/BWD 10/01/2025 270 R.K. MANDAL& CO. 491.79 0.00 0 1
1714 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap connection (FHTC) by retrofitting within the command area of Antpara Piped Water Supply Scheme at Jamalpur Block under Burdwan Division, P.H.E. DTE. , SM/08703 Retrofitting Functional Household Tap Connection (FHTC) at Baratikra village within the command area of Antpara Piped Water Supply Scheme at Jamalpur Block under Burdwan Division, PHE Dte. (Part-A). AE(HQs) JE/RWS/JAMALPUR ORD/000167/2021-2022 1858/AE/HQ 05/10/2021 30 J. K. CORPORATION 4.83 4.83 100 1
1715 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap connection (FHTC) by retrofitting within the command area of Antpara Piped Water Supply Scheme at Jamalpur Block under Burdwan Division, P.H.E. DTE. , SM/08703 Retrofitting Providing Functional Household Tap Connection (FHTC) at Baratikra village within the command area of Antpara Piped Water Supply Scheme at Jamalpur Block under Burdwan Division, PHE Dte. (Part-B). AE(HQs) JE/RWS/JAMALPUR ORD/000168/2021-2022 1859/AE/HQ 05/10/2021 30 INDRAJIT MONDAL 4.83 4.83 100 1
1716 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap connection (FHTC) by retrofitting within the command area of Antpara Piped Water Supply Scheme at Jamalpur Block under Burdwan Division, P.H.E. DTE. , SM/08703 Retrofitting Laying of HDPE pipeline at Antpara village for dedicated water supply at Dakshinmohonpur village within Antpara PWSS, Block-Jamalpur under Burdwan Division, PHE Dte. [Group : A] AE(HQs) JE/RWS/JAMALPUR ORD/000455/2021-2022 65/AE/HQ 11/02/2022 30 SUPER SKILL 4.68 4.68 100 1
1717 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap connection (FHTC) by retrofitting within the command area of Antpara Piped Water Supply Scheme at Jamalpur Block under Burdwan Division, P.H.E. DTE. , SM/08703 Retrofitting Continuation work order for functional household tap connection (FHTC) at Baratikra village within the command area of Antpara piped water supply scheme at Jamalpur Block under Burdwan Division, PHE Dte.[Part-A][Gr.-D] AE(HQs) JE/RWS/JAMALPUR ORD/000790/2021-2022 1950/AE/HQ 22/12/2021 30 J. K. CORPORATION 4.73 4.73 100 1
1718 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap connection (FHTC) by retrofitting within the command area of Antpara Piped Water Supply Scheme at Jamalpur Block under Burdwan Division, P.H.E. DTE. , SM/08703 Retrofitting Hire & fuel charges of vehicle (Car No.-WB-41H-3668) for the office of the Assistant Engineer, RWS Burdwan Sub-Division, PHE Dte. for the month of May & June'22. VCH/000494/2022-2023 462/VEH/22-23 29/08/2022 MD HASIN 0.51 0.00 0 0
1719 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap connection (FHTC) by retrofitting within the command area of Antpara Piped Water Supply Scheme at Jamalpur Block under Burdwan Division, P.H.E. DTE. , SM/08703 Retrofitting Laying of uPVC pipe for providing FHTC at Nandanpur Village within ANTPARA Piped Water Supply Scheme, Jamalpur Block under Burdwan Division P.H.E Dte._Gr-D AE(HQs) JE/RWS/JAMALPUR ORD/000666/2021-2022 146/AE/HQ 16/03/2022 20 MUNSHI JAVEDUR JAMAN 4.75 0.00 0 1
1720 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap connection (FHTC) by retrofitting within the command area of Antpara Piped Water Supply Scheme at Jamalpur Block under Burdwan Division, P.H.E. DTE. , SM/08703 Retrofitting Extension of pipeline for providing functional house hold tap connection at Dakshin Mohonpur & Uttar Mohanpur habitation under Antpara water supply scheme under Burdwan Division, PHE Dte. AE(HQs) JE/RWS/JAMALPUR ORD/000586/2020-2021 1244/AE/HQ 12/02/2021 30 DIBAKAR SHAW 4.81 1.49 30.98 1
1721 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap connection (FHTC) by retrofitting within the command area of Antpara Piped Water Supply Scheme at Jamalpur Block under Burdwan Division, P.H.E. DTE. , SM/08703 Retrofitting Extension of pipeline for providing functional house hold tap connection at Antpara habitation within the command area of Antpara water supply scheme under Burdwan Division, PHE Dte. AE(HQs) JE/RWS/JAMALPUR ORD/000567/2020-2021 1258/AE/HQ 15/02/2021 30 WESTERN WATER SUPPLY AGENCY 4.80 1.46 30.42 1
1722 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap connection (FHTC) by retrofitting within the command area of Antpara Piped Water Supply Scheme at Jamalpur Block under Burdwan Division, P.H.E. DTE. , SM/08703 Retrofitting Construction of sluice valve chamber and extension of pipeline for making functional of Household Tap at Daspur village within Antpara piped water supply scheme under Burdwan Division, PHE Dte.[Gr.-A] AE(HQs) JE/RWS/JAMALPUR ORD/000325/2021-2022 1728/AE/HQ 25/08/2021 30 J. K. CORPORATION 1.64 0.00 0 1
1723 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap connection (FHTC) by retrofitting within the command area of Antpara Piped Water Supply Scheme at Jamalpur Block under Burdwan Division, P.H.E. DTE. , SM/08703 Retrofitting Providing leftout water tap connection in different villages for 100% coverage to make it Sajal Gram from existing distribution system within scheme jurisdiction of different Piped Water Supply Schemes within Jamalpur Block (Paratal-II, Berugram, Abujhati & Chakdighi G.P.) under Burdwan Division, PHE. Dte. (Part-B). AE(HQs),Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JE/RWS/JAMALPUR ORD/000345/2021-2022 40/BWD 05/01/2022 30 PREMANANDA ROY BISWAS 22.68 0.00 0 1
1724 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap connection (FHTC) by retrofitting within the command area of Antpara Piped Water Supply Scheme at Jamalpur Block under Burdwan Division, P.H.E. DTE. , SM/08703 Retrofitting Construction of different dia. Sluice Valve chamber to operate water flow for supplying water in zonal demand basis within command area of Antpara PWSS under Burdwan Division, PHE Dte._Gr-C AE(HQs) JE/RWS/JAMALPUR ORD/000628/2021-2022 125/AE/HQ 04/03/2022 15 SUPER SKILL 4.81 4.81 100 1
1725 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap connection (FHTC) by retrofitting within the command area of Antpara Piped Water Supply Scheme at Jamalpur Block under Burdwan Division, P.H.E. DTE. , SM/08703 Retrofitting Laying of uPVC pipe for providing FHTC at Baratikra Village within ANTPARA Piped Water Supply Scheme, Jamalpur Block under Burdwan Division P.H.E Dte. [Group : C] AE(HQs) JE/RWS/JAMALPUR ORD/000036/2022-2023 242/AE/HQ 20/04/2022 30 J. K. CORPORATION 4.58 4.39 95.85 1
1726 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap connection (FHTC) by retrofitting within the command area of Antpara Piped Water Supply Scheme at Jamalpur Block under Burdwan Division, P.H.E. DTE. , SM/08703 Retrofitting Repairing and restoration of pipeline besides river bank of Damodar damaged due to construction of retaining wall at Antpara to Dakshinmohanpur within command area of ANTPARA PWSS under Burdwan Division, PHE Dte._Gr-B AE(HQs) JE/RWS/JAMALPUR ORD/000661/2021-2022 134/AE/HQ 11/03/2022 20 SUPER SKILL 4.18 0.00 0 1
1727 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap connection (FHTC) by retrofitting within the command area of Antpara Piped Water Supply Scheme at Jamalpur Block under Burdwan Division, P.H.E. DTE. , SM/08703 Retrofitting Providing leftout water tap connection in different villages for 100% coverage to make it Sajal Gram from existing distribution system within scheme jurisdiction of different Piped Water Supply Schemes within Jamalpur Block (Jarogram, Ajhapur, Panchra & Jougram G.P.) under Burdwan Division, PHE. Dte. (Part-A)_2ND CALL. AE(HQs),Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JE/RWS/JAMALPUR ORD/000592/2021-2022 1454/BWD 11/03/2022 30 PREMANANDA ROY BISWAS 18.83 0.00 0 1
1728 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap connection (FHTC) by retrofitting within the command area of Antpara Piped Water Supply Scheme at Jamalpur Block under Burdwan Division, P.H.E. DTE. , SM/08703 Retrofitting Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Ramkrishnapur village (Ramkrishnapur Habitation) of Antpara piped water supply scheme within Head Quarters under Burdwan Division, PHE Dte.[Part-A] AE(HQs) JE/RWS/JAMALPUR ORD/000950/2020-2021 1083/BWD 08/02/2021 15 DIBAKAR SHAW 4.78 4.77 99.79 1
1729 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap connection (FHTC) by retrofitting within the command area of Antpara Piped Water Supply Scheme at Jamalpur Block under Burdwan Division, P.H.E. DTE. , SM/08703 Retrofitting Laying of uPVC pipe for providing FHTC at Dakshinmohanpur habitation within ANTPARA Piped Water Supply Scheme, Jamalpur Block under Burdwan Division P.H.E Dte._Gr-C AE(HQs) JE/RWS/JAMALPUR ORD/000664/2021-2022 145/AE/HQ 16/03/2022 20 MUKHERJEE ENTERPRISE 4.75 4.68 98.53 1
1730 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap connection (FHTC) by retrofitting within the command area of Antpara Piped Water Supply Scheme at Jamalpur Block under Burdwan Division, P.H.E. DTE. , SM/08703 Retrofitting Providing Functional Household Tap Connection (FHTC) at Antpara village within the command area of ANTPARA Piped Water Supply Scheme at Jamalpur Block under Burdwan Division, PHE Dte. [Group : A] AE(HQs) JE/RWS/JAMALPUR ORD/000034/2022-2023 240/AE/HQ 20/04/2022 30 N.S. ENTERPRISE 4.77 3.69 77.36 1
1731 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap connection (FHTC) by retrofitting within the command area of Antpara Piped Water Supply Scheme at Jamalpur Block under Burdwan Division, P.H.E. DTE. , SM/08703 Retrofitting Sinking of 300 X 200mm dia Tube Well 150 mtr. Depth by D.R. Rig method using UPVC pipe (CM) and UPVC Medium Well Screen (RMS) of ANTPARA & its adjoining mouzas Piped Water Supply Scheme, [Nandanpur Vill.] Block ? Jamalpur, Dist - Purba Bardhaman under Burdwan Division, PHE Dte. _2ND CALL. AE(HQs) JE/RWS/JAMALPUR ORD/000566/2022-2023 5275/BWD 30/11/2022 30 SUSUNIA GP CO. OPERATIVE LABOUR CONTRACT AND CONSTRUCTION SOCIETY LTD. 9.45 9.44 99.89 0
1732 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap connection (FHTC) by retrofitting within the command area of Antpara Piped Water Supply Scheme at Jamalpur Block under Burdwan Division, P.H.E. DTE. , SM/08703 Retrofitting Laying of distribution system of different damaged section at Chakundi & Saligram village regarding smooth running FHTC work within Nabastha PWSS, Bardhhaman II Development Block under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. Junior Engineer, Burdwan Sadar Sub-Division ORD/000138/2023-2024 787/BSD 28/04/2023 30 D.M. ENTERPRISE 0.97 0.95 97.94 100
1733 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap connection (FHTC) by retrofitting within the command area of Antpara Piped Water Supply Scheme at Jamalpur Block under Burdwan Division, P.H.E. DTE. , SM/08703 Retrofitting Laying of UPVC Pipeline at Daspur Habitation under ANTPARA Piped Water Supply Scheme, Jamalpur Development Block under Burdwan Division, PHE Dte. AE(HQs) J.E. 2 BURDWAN ORD/000409/2023-2024 416/AE/HQ 01/08/2023 30 J K CORPORATION 0.96 0.94 97.92 100
1734 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap connection (FHTC) by retrofitting within the command area of Antpara Piped Water Supply Scheme at Jamalpur Block under Burdwan Division, P.H.E. DTE. , SM/08703 Retrofitting Re-Laying of UPVC Pipeline (Damaged by Irrigation Department) at Dakshin Mohanpur Habitation under ANTPARA Piped Water Supply Scheme, Jamalpur Development Block under Burdwan Division, PHE Dte. AE(HQs) J.E. 2 BURDWAN ORD/000407/2023-2024 400/AE/HQ 28/07/2023 30 J K CORPORATION 0.96 0.94 97.92 100
1735 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap connection (FHTC) by retrofitting within the command area of Antpara Piped Water Supply Scheme at Jamalpur Block under Burdwan Division, P.H.E. DTE. , SM/08703 Retrofitting Laying UPVC (Damaged By Irrigation Department) pipeline at Uttar Mohanpur habitation, ANTPARA Piped W/S. Scheme, Jamalpur Dev. Block under Burdwan Division, PHE Dte. AE(HQs) Junior Engineer, Burdwan Division ORD/001072/2023-2024 168/AE/HQ 07/03/2024 30 J.K. CORPORATION 0.92 0.00 0 100
1736 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap connection (FHTC) by retrofitting within the command area of Antpara Piped Water Supply Scheme at Jamalpur Block under Burdwan Division, P.H.E. DTE. , SM/08703 Retrofitting Laying of UPVC (Damaged By Irrigation Department) pipeline at Daspur & Uttar Mohanpur habitation, ANTPARA Piped W/S. Scheme, Jamalpur Dev. Block under Burdwan Division, PHE Dte. AE(HQs) Junior Engineer, Burdwan Division ORD/001071/2023-2024 167/AE/HQ 07/03/2024 30 J.K. CORPORATION 0.82 0.00 0 100
1737 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap connection (FHTC) by retrofitting within the command area of Antpara Piped Water Supply Scheme at Jamalpur Block under Burdwan Division, P.H.E. DTE. , SM/08703 Retrofitting Laying of UPVC (Damaged By Irrigation Department) pipeline near Baratikra Bridge including construction of new valve chamber under ANTPARA Piped W/S. Scheme, Jamalpur Dev. Block under Burdwan Division, PHE Dte. AE(HQs) Junior Engineer, Burdwan Division ORD/001073/2023-2024 169/AE/HQ 07/03/2024 30 J.K. CORPORATION 0.84 0.00 0 100
1738 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap connection (FHTC) by retrofitting within the command area of Antpara Piped Water Supply Scheme at Jamalpur Block under Burdwan Division, P.H.E. DTE. , SM/08703 Retrofitting Re-laying of UPVC (Damaged By WBSRDA Department) pipeline near RAMKRISHNAPUR MONDAL PARA under ANTPARA PWSS, Jamalpur Dev. Block under Burdwan Division, PHE Dte. AE(HQs) Junior Engineer, Burdwan Division ORD/000588/2024-2025 740/AE/HQ 13/09/2024 30 J.K. CORPORATION 0.96 0.48 50 100
1739 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap connection (FHTC) by retrofitting within the command area of Antpara Piped Water Supply Scheme at Jamalpur Block under Burdwan Division, P.H.E. DTE. , SM/08703 Retrofitting Re-laying of UPVC (Damaged By WBSRDA Department) pipeline near RAMKRISHNAPUR MUSLIM PARA under ANTPARA PWSS, Jamalpur Dev. Block under Burdwan Division, PHE Dte. AE(HQs) Junior Engineer, Burdwan Division ORD/000589/2024-2025 741/AE/HQ 13/09/2024 30 J.K. CORPORATION 0.95 0.47 49.47 100
1740 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap connection (FHTC) by retrofitting within the command area of Antpara Piped Water Supply Scheme at Jamalpur Block under Burdwan Division, P.H.E. DTE. , SM/08703 Retrofitting Arrangement of drinking water supply by installation of solar submersible pump including sinking of 200 mm. dia. Tube well 150 Mtr. Deep by direct rotary rig method, Laying dist. System, FHTC and 2 Nos. 5000 Ltr. PVC tank installation with construction of RCC structure for ANTPARA Piped W/S. Scheme, Block Jamalpur under Burdwan Division, PHE Dte. AE(HQs) JE/RWS/JAMALPUR,Junior Engineer, Burdwan Division ORD/001082/2023-2024 1085/BWD 12/03/2024 259 HI-LIGHT ELECTRONICS 16.31 4.40 26.98 40
1741 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap connection (FHTC) by retrofitting within the command area of Antpara Piped Water Supply Scheme at Jamalpur Block under Burdwan Division, P.H.E. DTE. , SM/08703 Retrofitting Extension of Pipeline with Providing Functional Household Tap Connection (FHTC) within Daspur (Mouza) of the command area of ANTPARA Piped Water Supply Scheme Near Daspur Football Play Ground, Jamalpur Block within the Jurisdiction of the Assistant Engineer, HQ, Burdwan Division under Burdwan Division, P.H.E. Dte. AE(HQs) Junior Engineer, Burdwan Division ORD/000618/2024-2025 752/AE/HQ 18/09/2024 30 GHOSH ENTERPRISE 0.96 0.96 100 100
1742 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap connection (FHTC) by retrofitting within the command area of Antpara Piped Water Supply Scheme at Jamalpur Block under Burdwan Division, P.H.E. DTE. , SM/08703 Retrofitting Construction of temporary kiosk for the necessary arrangement of electrification of 4th tube well at Nandanpur (mouza) under Antpata P.W.S.S within the jurisdiction of the Assistant Engineer, HQ, Burdwan Division under Burdwan Division, P.H.E. Dte. AE(HQs) Junior Engineer, Burdwan Division ORD/000623/2024-2025 757/AE/HQ 18/09/2024 30 GHOSH ENTERPRISE 0.33 0.33 100 100
1743 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap connection (FHTC) by retrofitting within the command area of Antpara Piped Water Supply Scheme at Jamalpur Block under Burdwan Division, P.H.E. DTE. , SM/08703 Retrofitting Extension of Pipeline with Providing Functional Household Tap Connection (FHTC) within Antpara (Mouza) & Daspur (Mouza) of the command area of ANTPARA Piped Water Supply Scheme, Jamalpur Block within the Jurisdiction of the Assistant Engineer, HQ, Burdwan Division under Burdwan Division, P.H.E. Dte. AE(HQs) Junior Engineer, Burdwan Division ORD/000619/2024-2025 753/AE/HQ 18/09/2024 30 GHOSH ENTERPRISE 0.96 0.36 37.5 100
1744 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap connection (FHTC) by retrofitting within the command area of Antpara Piped Water Supply Scheme at Jamalpur Block under Burdwan Division, P.H.E. DTE. , SM/08703 Retrofitting Construction of Boundary wall, Land Development for various PWSS, Block- Jamalpur, District:- Purba-Bardhaman within Burdwan Sub Division under Burdwan Division PHE Dte. AE(HQs) ORD/001100/2024-2025 433/BWD 20/01/2025 120 RABINDRA NATH GORANG 132.64 0.00 0 0
1745 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap connection (FHTC) by retrofitting within the command area of Antpara Piped Water Supply Scheme at Jamalpur Block under Burdwan Division, P.H.E. DTE. , SM/08703 Retrofitting Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Dakshin Mohanpur village (Dakshin Mohanpur Habitation) of Antpara piped water supply scheme within Head Quarters under Burdwan Division, PHE Dte. AE(HQs) JE/RWS/JAMALPUR,Junior Engineer, Burdwan Division ORD/000951/2020-2021 4691/BWD 20/01/2021 809 DIBAKAR SHAW 4.86 4.08 83.95 100
1746 PURBA BARDHAMAN Burdwan Division Providing Functional House hold Tap Connection (FHTC) by retrofitting within the command area of Bagila piped Water Supply Scheme at Memari-I Block under Burdwan Division, P.H.E. DTE. , SM/08704 Retrofitting Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Bagila village (Bagila Habitation) of Bagila piped water supply scheme within Burdwan Sub-Division under Burdwan Division, PHE Dte.(Part-A)[SL NO.-08] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000745/2020-2021 587./BWD 25/01/2021 15 PAL CONSTRUCTION 4.86 4.86 100 1
1747 PURBA BARDHAMAN Burdwan Division Providing Functional House hold Tap Connection (FHTC) by retrofitting within the command area of Bagila piped Water Supply Scheme at Memari-I Block under Burdwan Division, P.H.E. DTE. , SM/08704 Retrofitting Providing Functional Household Tap Connection(FHTC) from existing distribution system within the command area of BAGILA Piped Water Supply Scheme at Kiskinda (2 nos Hab), Krishnapur, Talchini & Bagila (Part) Village (Mouza), Memari-I Block under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000149/2021-2022 4659/BWD 10/09/2021 60 HAMID SK 60.69 53.57 88.27 1
1748 PURBA BARDHAMAN Burdwan Division Providing Functional House hold Tap Connection (FHTC) by retrofitting within the command area of Bagila piped Water Supply Scheme at Memari-I Block under Burdwan Division, P.H.E. DTE. , SM/08704 Retrofitting Extension of pipe line for BAGILA Piped Water Supply Scheme at Krishnapur,Baharampur,Kiskindha,Taktipur in Memari-I Block including leftout household water tap connection (FHTC) under Burdwan Division, PHE Dte.Group : A Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000102/2022-2023 983/BSD 16/06/2022 30 A R TRADERS 4.83 4.83 100 1
1749 PURBA BARDHAMAN Burdwan Division Providing Functional House hold Tap Connection (FHTC) by retrofitting within the command area of Bagila piped Water Supply Scheme at Memari-I Block under Burdwan Division, P.H.E. DTE. , SM/08704 Retrofitting Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Bagila village (Bagila Habitation) of Bagila piped water supply scheme within Burdwan Sub-Division under Burdwan Division, PHE Dte.(Part-B)[SL NO.-09] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE.,Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000746/2020-2021 585./BWD 25/01/2021 15 HAMID SK 4.87 4.87 100 1
1750 PURBA BARDHAMAN Burdwan Division Providing Functional House hold Tap Connection (FHTC) by retrofitting within the command area of Bagila piped Water Supply Scheme at Memari-I Block under Burdwan Division, P.H.E. DTE. , SM/08704 Retrofitting Extension of pipeline for BAGILA Water Supply Scheme at (Baharampur, Taktipur, Krishnapur & Kiskinda North East) village within Memari I Block, under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000669/2021-2022 1708/BWD 25/03/2022 30 A R TRADERS 27.27 27.27 100 1
1751 PURBA BARDHAMAN Burdwan Division Providing Functional House hold Tap Connection (FHTC) by retrofitting within the command area of Bagila piped Water Supply Scheme at Memari-I Block under Burdwan Division, P.H.E. DTE. , SM/08704 Retrofitting Sinking of additional 250 X 200mm dia Tube Well 150 mtr. Depth by D.R. Rig method using UPVC pipe (CD) and UPVC Deep Well Screen (RDS) for BAGILA Piped Water Supply Scheme, Block - Memari - II, Dist - Purba Bardhaman under Burdwan Division, PHE Dte._ 2ND CALL Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000257/2022-2023 3503/BWD 10/08/2022 30 MUNSHI ENTERPRISE 10.18 0.00 0 1
1752 PURBA BARDHAMAN Burdwan Division Providing Functional House hold Tap Connection (FHTC) by retrofitting within the command area of Bagila piped Water Supply Scheme at Memari-I Block under Burdwan Division, P.H.E. DTE. , SM/08704 Retrofitting Emergency repaired cleaning of chokage AC Pipeline for (Retrofittins) for BAGILA Piped water supply scheme at Baharampur, Takipur & Kiskinda village for smooth drinking water supply (FHTC) within Memari-I Block under Burdwan Division, PHE Dte. Gr.A Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000561/2022-2023 1918/BSD 11/11/2022 15 A R TRADERS 0.93 0.93 100 1
1753 PURBA BARDHAMAN Burdwan Division Providing Functional House hold Tap Connection (FHTC) by retrofitting within the command area of Bagila piped Water Supply Scheme at Memari-I Block under Burdwan Division, P.H.E. DTE. , SM/08704 Retrofitting Sinking of additional tube well 250 x 200 mm dia Tube well 150 mtr depth by D.R. Rig method using upvc pipe (CD) and fibre glass strainer for Bagila piped water supply scheme (2nd tube well site), Block-Memari-I under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/001312/2020-2021 1494/BWD 18/02/2021 30 C.M. ENTERPRISE 8.68 8.21 94.59 0
1754 PURBA BARDHAMAN Burdwan Division Providing Functional House hold Tap Connection (FHTC) by retrofitting within the command area of Bagila piped Water Supply Scheme at Memari-I Block under Burdwan Division, P.H.E. DTE. , SM/08704 Retrofitting Continuation work order for Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Bagila village (Bagila habitation) of Bagila Piped Water Supply Scheme within Burdwan Sub-Divn. under Burdwan Division, PHE. Dte. (Part - B) [SL. No. : 09] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000042/2021-2022 3465/BWD 29/06/2021 15 HAMID SK 4.87 4.87 100 0
1755 PURBA BARDHAMAN Burdwan Division Providing Functional House hold Tap Connection (FHTC) by retrofitting within the command area of Bagila piped Water Supply Scheme at Memari-I Block under Burdwan Division, P.H.E. DTE. , SM/08704 Retrofitting Continuation work order for Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Bagila village (Bagila habitation) of Bagila Piped Water Supply Scheme within Burdwan Sub-Divn. under Burdwan Division, PHE. Dte. (Part - A) [SL. No. : 08] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000034/2021-2022 3406/BWD 25/06/2021 15 PAL CONSTRUCTION 4.86 4.86 100 0
1756 PURBA BARDHAMAN Burdwan Division Providing Functional House hold Tap Connection (FHTC) by retrofitting within the command area of Bagila piped Water Supply Scheme at Memari-I Block under Burdwan Division, P.H.E. DTE. , SM/08704 Retrofitting MAINTENANCE OF ROAD (WHISH IS DAMAGED FOR LAYING PIPELINE BY PHE DEPTT) NAMELY NARUGRAM H.C TO BADSHI ROAD VIDE- PACKAGE NO- WB 22 12 UNDER PMGSY-III UNDER NARUGRAM GP. & RAINA-I BLOCK, IN PURBA BARDHAMAN DISTRICT BILL/00740/2024-2025 894/JJM 25/09/2024 EXECUTIVE ENGINEER (WBSRDA) PURBA BARDHAMAN DIVISION 3.86 0.00 0 null
1757 PURBA BARDHAMAN Burdwan Division Providing Functional House hold Tap Connection (FHTC) by retrofitting within the command area of Bagila piped Water Supply Scheme at Memari-I Block under Burdwan Division, P.H.E. DTE. , SM/08704 Retrofitting Restoration of Pump House at Head Work site of BAGILA Piped water supply scheme at Memari-I Block under Burdwan Division, Dist.-Purba Bardhaman Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000126/2024-2025 1006/BSD 06/06/2024 30 A.R. TRADERS 0.96 0.47 48.96 100
1758 PURBA BARDHAMAN Burdwan Division Providing Functional House hold Tap Connection (FHTC) by retrofitting within the command area of Bagila piped Water Supply Scheme at Memari-I Block under Burdwan Division, P.H.E. DTE. , SM/08704 Retrofitting Preparation and Submission of DPR for Augmentation of Ground Water Based Piped Water Supply Scheme for MAHESHDANGA, Block:Memari-I under Burdwan Division, P.H.E Dte. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000988/2024-2025 1909/BSD 28/08/2024 15 CARTO 0.00 0.00 NAN 0
1759 PURBA BARDHAMAN Burdwan Division Providing Functional House hold Tap Connection (FHTC) by retrofitting within the command area of Bagila piped Water Supply Scheme at Memari-I Block under Burdwan Division, P.H.E. DTE. , SM/08704 Retrofitting Laying of 150mm DI pipeline for interconnection of 4no tw to distribution line & Kalsi mouza 3rd tw to distribution line for Bagila Piped Water Supply Scheme under memari-I Block, District:- Purba-Bardhaman. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/001071/2024-2025 105/BSD 16/01/2025 30 A.R. TRADERS 1.88 0.00 0 0
1760 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap connection (FHTC) by retrofitting within the command area of Natungram Piped Water Supply Scheme at Ketugram-II Block under Burdwan Division, P.H.E. DTE. , SM/08713 Retrofitting Connection of CWR & IEP with the existing distribution system under Natungram Piped Water Supply Scheme under Katwa Sub-Division under Burdwan Division, P.H.E. Dte. [Sl No-01] Assistant Engineer Junior Engineer, R.W.S., Katwa-I Dev. Block ORD/000596/2021-2022 160/KTS 24/02/2022 30 JAHAR GHOSH 1.50 1.36 90.67 1
1761 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap connection (FHTC) by retrofitting within the command area of Natungram Piped Water Supply Scheme at Ketugram-II Block under Burdwan Division, P.H.E. DTE. , SM/08713 Retrofitting Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of Natungram Piped Water Supply Scheme at Natungram (Part) & Charnarayanpur Village (Mouza), Ketugram-II Block under Burdwan Division, PHE Dte. (Agreement no. 567/BWD of 2020-2021) AE(HQs) J.E. 2 BURDWAN ORD/000294/2020-2021 357/BWD 15/01/2021 30 JAHAR GHOSH 22.73 6.83 30.05 1
1762 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap connection (FHTC) by retrofitting within the command area of Natungram Piped Water Supply Scheme at Ketugram-II Block under Burdwan Division, P.H.E. DTE. , SM/08713 Retrofitting Construction of sanitary system and drinking water supply arrangement for Head Work Site of Natungram Water Supply Scheme under Katwa Sub-Division within Burdwan Division P.H.E Dte. (Sl No-3) Assistant Engineer Junior Engineer, R.W.S., Katwa-I Dev. Block ORD/000275/2021-2022 800/KTS 10/12/2021 45 JAHAR GHOSH 1.00 0.23 23 1
1763 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap connection (FHTC) by retrofitting within the command area of Natungram Piped Water Supply Scheme at Ketugram-II Block under Burdwan Division, P.H.E. DTE. , SM/08713 Retrofitting Construction of Boundary wall including land development, Pathway and plantation at Head works site of Natungram water supply scheme, Block-Ketugram-II under Katwa Sub-Division under Burdwan Division, PHE Dte. [Tr No.-347/BWD/20-21] Assistant Engineer Junior Engineer, R.W.S., Katwa-I Dev. Block ORD/000482/2020-2021 4282/BWD 03/11/2020 60 MOJAI SK 31.33 8.94 28.53 1
1764 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap connection (FHTC) by retrofitting within the command area of Natungram Piped Water Supply Scheme at Ketugram-II Block under Burdwan Division, P.H.E. DTE. , SM/08713 Retrofitting Regarding release of fund for restoration of road under PMGSY scheme under Ketugram-II Block Katwa Sub-Division PHE Dte. Khatundi to Chitahati (Package No-WB-22-47) BILL/00772/2024-2025 896/JJM 26/09/2024 EXECUTIVE ENGINEER (WBSRDA) PURBA BARDHAMAN DIVISION 2.45 0.00 0 null
1765 PURBA BARDHAMAN Burdwan Division Providing Functional House hold Tap Connection (FHTC) by retrofitting at Hatbela and Hridaypur mouza within the command area of Sultanpur piped Water Supply Scheme at Kalna-I Block under Burdwan Division, P.H.E. DTE. (Pt.-B) , SM/08700 Retrofitting Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of Sultanpur Piped Water Supply Scheme at Halbele, Hridaypur, Isabpur, Nowapara & Uplati Village (Mouza), Kalna ¿ I Block under Burdwan Division, PHE Dte.(Agreement No. 56/2020-2021 OF SE/CC/PHE. DTE.) Assistant Engineer ORD/000124/2020-2021 4901/BWD 07/12/2020 90 MAJILA ENTERPRISE 94.67 6.47 6.83 1
1766 PURBA BARDHAMAN Burdwan Division Providing Functional House hold Tap Connection (FHTC) by retrofitting at Hatbela and Hridaypur mouza within the command area of Sultanpur piped Water Supply Scheme at Kalna-I Block under Burdwan Division, P.H.E. DTE. (Pt.-B) , SM/08700 Retrofitting Protection work of distribution system (200 mm dia) of 35 Mtr length near the head work site (Right Side) of Sultanpur & its adjoining mouzas water supply scheme by UC Bullah including Drum Sheet within Kalna Sub-Division under Burdwan Division, PHE Dte.[Gr.-E] Assistant Engineer ORD/000845/2020-2021 20/KSD 07/01/2021 30 DEBASHISH ENTERPRISE 0.75 0.00 0 1
1767 PURBA BARDHAMAN Burdwan Division Providing Functional House hold Tap Connection (FHTC) by retrofitting at Hatbela and Hridaypur mouza within the command area of Sultanpur piped Water Supply Scheme at Kalna-I Block under Burdwan Division, P.H.E. DTE. (Pt.-B) , SM/08700 Retrofitting Extension of different dia UPVC pipeline at different section of village Upalati, Hridaypur, Gopalpur, Sultanpur & Hatbele to cover up the uncovered habitation of Sultanpur PWSS within Kalna Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer ORD/000244/2021-2022 6122/BWD 26/10/2021 30 MAJILA ENTERPRISE 14.34 14.29 99.65 1
1768 PURBA BARDHAMAN Burdwan Division Providing Functional House hold Tap Connection (FHTC) by retrofitting at Hatbela and Hridaypur mouza within the command area of Sultanpur piped Water Supply Scheme at Kalna-I Block under Burdwan Division, P.H.E. DTE. (Pt.-B) , SM/08700 Retrofitting Providing FHTC in each household from dist. System within Scheme jurisdiction in Hridaypur, Upalati, Belerhat, Gopalpur, Sultanpur, Isabpur & Naopara Village of SULTANPUR W/S. Scheme under Burdwan Division, PHE Dte. Assistant Engineer ORD/000584/2021-2022 1357/BWD 09/03/2022 30 TAPAS KUMAR ROY 16.69 16.45 98.56 1
1769 PURBA BARDHAMAN Burdwan Division Providing Functional House hold Tap Connection (FHTC) by retrofitting at Hatbela and Hridaypur mouza within the command area of Sultanpur piped Water Supply Scheme at Kalna-I Block under Burdwan Division, P.H.E. DTE. (Pt.-B) , SM/08700 Retrofitting Hire & fuel charges of vehicle (Car No.-WB-04G-7127) for the office of the Assistant Engineer, Kalna Sub-Division, PHE Dte. for the month of December22 to February'23. BILL/00118/2023-2024 30/JJM 19/04/2023 PARTHA PRATIM ACHARYA 1.19 0.00 0 0
1770 PURBA BARDHAMAN Burdwan Division Providing Functional House hold Tap Connection (FHTC) by retrofitting at Hatbela and Hridaypur mouza within the command area of Sultanpur piped Water Supply Scheme at Kalna-I Block under Burdwan Division, P.H.E. DTE. (Pt.-B) , SM/08700 Retrofitting Digital structurization of pipeline alignment and asset evaluation including holistic design, preparation of design drawings of overall LDS & preparation of estimate for 11 Nos. Piped W/S. Schemes under Kalna I Block under Kalna Sub-Division under Burdwan Division, PHE. Dte. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000335/2024-2025 3015/BWD 05/08/2024 60 HORIZEN 29.60 5.55 18.75 10
1771 PURBA BARDHAMAN Burdwan Division Augmentation of Parulia PWSS for providing Functional House Hold Tap Connection (FHTC) , SM/09719 Augmentation Supply of materials for different water supply scheme under Burdwan Division, PHE Dte. VCH/001578/2021-2022 1207/DW 10/03/2022 EXECUTIVE ENGINEER, RESOURCES DIVISION, P.H.E. DTE. 3,005.00 0.00 0 0
1772 PURBA BARDHAMAN Burdwan Division Augmentation of Parulia PWSS for providing Functional House Hold Tap Connection (FHTC) , SM/09719 Augmentation Preparation of DPR for augmentation of Parulia W/S Scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. (Sl No-D) Assistant Engineer ORD/000582/2021-2022 216/KSD 24/02/2022 21 M/S R. DUTTA & CO. 2.84 2.79 98.24 1
1773 PURBA BARDHAMAN Burdwan Division Augmentation of Parulia PWSS for providing Functional House Hold Tap Connection (FHTC) , SM/09719 Augmentation Sinking of 250 X 150mm dia Tube Well 150 mtr. Depth by D.R. Rig method using UPVC pipe (CM) and UPVC Deep Well Screen (RMS) for 2nd TW Site of Aug. of PARULIA & its adjoining mouzas Piped Water Supply Scheme, Block ? Purbasthali ? II, Dist - Purba Bardhaman under Burdwan Division, PHE Dte. Assistant Engineer ORD/000549/2022-2023 5126/BWD 21/11/2022 30 M/S SYCHROTECH INDUSTRY 8.72 8.18 93.81 0
1774 PURBA BARDHAMAN Burdwan Division Augmentation of Parulia PWSS for providing Functional House Hold Tap Connection (FHTC) , SM/09719 Augmentation Material Requisition To Resource Division RTOR000034/2021-2022 535/BWD 27/01/2022 Resource Division 14.55 0.00 0 0
1775 PURBA BARDHAMAN Burdwan Division Augmentation of Parulia PWSS for providing Functional House Hold Tap Connection (FHTC) , SM/09719 Augmentation Material Requisition To Resource Division RTOR000080/2021-2022 604/BWD 28/01/2022 Resource Division 24.12 0.00 0 0
1776 PURBA BARDHAMAN Burdwan Division Augmentation of Parulia PWSS for providing Functional House Hold Tap Connection (FHTC) , SM/09719 Augmentation Material Requisition To Resource Division RTOR000108/2021-2022 906/BWD 15/02/2022 Resource Division 6.93 0.00 0 0
1777 PURBA BARDHAMAN Burdwan Division Augmentation of Parulia PWSS for providing Functional House Hold Tap Connection (FHTC) , SM/09719 Augmentation Material Requisition To Resource Division RTOR000240/2021-2022 1564/BWD 15/03/2022 Resource Division 0.37 0.00 0 0
1778 PURBA BARDHAMAN Burdwan Division Augmentation of Parulia PWSS for providing Functional House Hold Tap Connection (FHTC) , SM/09719 Augmentation Material Requisition To Resource Division RTOR000039/2022-2023 4632/BWD 17/10/2022 Resource Division 12.32 0.00 0 0
1779 PURBA BARDHAMAN Burdwan Division Augmentation of Parulia PWSS for providing Functional House Hold Tap Connection (FHTC) , SM/09719 Augmentation Augmentation of PARULIA Piped Water Supply Scheme with LDS, FHTC, Rising Main, Construction 300 Cum capacity OHR with 20.0 Mtr. Staging height inclusive of soil test & Construction of Boundary wall under Kalna Sub-Division, Block ¿ Purbasthali ¿ II, Dist. - Purba Bardhaman under Burdwan Division, PHE. Dte. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000437/2021-2022 699/BWD 02/02/2022 360 M/S ASHA CONSTRUCTION 407.54 378.25 92.81 100
1780 PURBA BARDHAMAN Burdwan Division Augmentation of Parulia PWSS for providing Functional House Hold Tap Connection (FHTC) , SM/09719 Augmentation Different types of works involve in connection with Augmentation of JHAUDANGA (SM/16293), KASHIPUR (SM/16297), PATULI (SM/09718) & PARULIA (SM/09719) Piped water supply scheme under Purbasthali-II Block, Kalna Sub-Division, PHE Dte. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000163/2024-2025 2202/BWD 13/06/2024 360 MONDAL PRECISION PVT LTD 570.00 0.00 0 2
1781 PURBA BARDHAMAN Burdwan Division RETROFITTING WORKS FOR PROVIDING FUNCTIONAL HOUSEHOLD TAP CONNECTION FHTC WITHIN THE COMMAND AREA OF BHALKI WATER SUPPLY SCHEME AUSGRAM II BLOCK PURBA BARDHAMAN , SM/10055 Retrofitting Construction of Drain and restoration of connection for Augmentation of BHALKI W/S Scheme , Block- Ausgram-II, under Durgapur (Burdwan North)Sub Division Burdwan Division, P.H.E. Dte. [SL-B] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000121/2022-2023 334/DSD 27/06/2022 30 TAUSIF HOSSAIN MONDAL 1.88 0.00 0 1
1782 PURBA BARDHAMAN Burdwan Division RETROFITTING WORKS FOR PROVIDING FUNCTIONAL HOUSEHOLD TAP CONNECTION FHTC WITHIN THE COMMAND AREA OF BHALKI WATER SUPPLY SCHEME AUSGRAM II BLOCK PURBA BARDHAMAN , SM/10055 Retrofitting Making structure with GI pipe for provision of joining and laying of pipeline near Abhirampur branch Canal for Bhalki and its adjoining mouza's Piped W/S Scheme at Ausgram-II Block within Durgapur Sub Division under Burdwan Division, P.H.E. Dte. [Gr.-H] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000134/2022-2023 349/DSD 30/06/2022 45 PARTHA RAY 1.90 0.00 0 1
1783 PURBA BARDHAMAN Burdwan Division RETROFITTING WORKS FOR PROVIDING FUNCTIONAL HOUSEHOLD TAP CONNECTION FHTC WITHIN THE COMMAND AREA OF BHALKI WATER SUPPLY SCHEME AUSGRAM II BLOCK PURBA BARDHAMAN , SM/10055 Retrofitting Providing Functional Household Tap Connection (FHTC) from existing distribution system with within the command area of augmentation BHALKI Piped Water Supply Scheme at Bhalki (Part), Chandipur (Part), Samantapara (Part), Telota (Part) & Abhirampuri (Part) village, habitation, Ausgram-II Block within Durgapur (Burdwan North) Sub Division under Burdwan Division, P.H.E. Dte. Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000006/2022-2023 1907/BWD 07/04/2022 30 ROY CONSTRUCTION 49.52 49.18 99.31 1
1784 PURBA BARDHAMAN Durgapur W/S Division RETROFITTING WORKS FOR PROVIDING FUNCTIONAL HOUSEHOLD TAP CONNECTION FHTC WITHIN THE COMMAND AREA OF BHALKI WATER SUPPLY SCHEME AUSGRAM II BLOCK PURBA BARDHAMAN , SM/10055 Retrofitting Material Requisition To Resource Division RTOR000048/2024-2025 468/DWSD 17/03/2025 Resource Division 0.28 0.00 0 0
1785 PURBA BARDHAMAN Durgapur W/S Division RETROFITTING WORKS FOR PROVIDING FUNCTIONAL HOUSEHOLD TAP CONNECTION FHTC WITHIN THE COMMAND AREA OF BHALKI WATER SUPPLY SCHEME AUSGRAM II BLOCK PURBA BARDHAMAN , SM/10055 Retrofitting Acceptance cum Formal Work Order for the work of Sinking of 250 x 150 mtr deapth by DR Rig and supplying and laying of UPVC pipe line (LDS) and construction of temporary KIOSK for arrangement of electrification of Tube well at BHALKI under BHALKI PWSS , Block- Ausgram-II, Dist- Purba Bardhaman under Durgapur W/S Division, PHE Dte. Assistant Engineer-II Contractual Junior Engineer_5 ORD/000055/2024-2025 772/DWSD 06/06/2024 360 EVEREST INFRATECH INC 64.56 0.00 0 5
1786 PURBA BARDHAMAN Burdwan Division Providing Functional House hold Tap Connection (FHTC) by retrofitting at Kaichar, Sitalgram, Haripur and Mathrun mouzas within the command area of Jageswardihi piped Water Supply Scheme at Mangolkote Block under Burdwan Division, P.H.E. DTE. (Pt.-B) , SM/08707 Retrofitting Providing Functional Household Tap Connection from existing distribution system within the command area of JAGGESWARDIHI PWSS under Sitalgram village under Mongalkote Block within Katwa Sub-Division under Burdwan Division PHE Dte. Assistant Engineer ORD/000163/2022-2023 3150/BWD 20/07/2022 30 BAMDEB CONSTRUCTION & CO 15.40 13.71 89.03 1
1787 PURBA BARDHAMAN Burdwan Division Providing Functional House hold Tap Connection (FHTC) by retrofitting at Kaichar, Sitalgram, Haripur and Mathrun mouzas within the command area of Jageswardihi piped Water Supply Scheme at Mangolkote Block under Burdwan Division, P.H.E. DTE. (Pt.-B) , SM/08707 Retrofitting Extension of pipe line at Kaichar Paschim Para from the existing Distribution System within scheme jurisdiction under Jaggeswardihi PWSS under Mongalkote Block under Katwa Sub-Division under Burdwan Division PHE Dte. [Sl No-06] Assistant Engineer ORD/000609/2021-2022 173/KTS 25/02/2022 15 BABUL SK 4.67 4.67 100 1
1788 PURBA BARDHAMAN Burdwan Division Providing Functional House hold Tap Connection (FHTC) by retrofitting at Kaichar, Sitalgram, Haripur and Mathrun mouzas within the command area of Jageswardihi piped Water Supply Scheme at Mangolkote Block under Burdwan Division, P.H.E. DTE. (Pt.-B) , SM/08707 Retrofitting Extension of pipeline from the existing distribution system within scheme jurisdiction at Kanaidanga under Jaggeswardihi piped water supply scheme under Mongalkote Block within Katwa Sub-Division under Burdwan Division, PHE Dte. [Phase-2] Assistant Engineer JUNIOR ENGINEER R.W.S. BURDWAN SUB-DIVISION PHE DTE ORD/000830/2020-2021 82/KTS 09/02/2021 15 HAMID SK 1.25 0.00 0 1
1789 PURBA BARDHAMAN Burdwan Division Providing Functional House hold Tap Connection (FHTC) by retrofitting at Kaichar, Sitalgram, Haripur and Mathrun mouzas within the command area of Jageswardihi piped Water Supply Scheme at Mangolkote Block under Burdwan Division, P.H.E. DTE. (Pt.-B) , SM/08707 Retrofitting Providing leftout water tap connection in different villages for 100% coverage to make it Sajal Gram from existing distribution system within scheme jurisdiction of different Piped Water Supply Schemes within Mongalkote Block under Burdwan Division, PHE. Dte. Assistant Engineer ORD/000407/2021-2022 284/BWD 17/01/2022 30 BABUL SK 6.81 0.00 0 1
1790 PURBA BARDHAMAN Burdwan Division Providing Functional House hold Tap Connection (FHTC) by retrofitting at Kaichar, Sitalgram, Haripur and Mathrun mouzas within the command area of Jageswardihi piped Water Supply Scheme at Mangolkote Block under Burdwan Division, P.H.E. DTE. (Pt.-B) , SM/08707 Retrofitting Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of Jageswardihi Piped Water Supply Scheme at Kaichar & Sitalgram Village (Mouza), Mongolkot Block under Burdwan Division, PHE Dte. Assistant Engineer ORD/000258/2021-2022 6694/BWD 01/12/2021 60 HAMID SK 58.77 8.44 14.36 1
1791 PURBA BARDHAMAN Burdwan Division Providing Functional House hold Tap Connection (FHTC) by retrofitting at Kaichar, Sitalgram, Haripur and Mathrun mouzas within the command area of Jageswardihi piped Water Supply Scheme at Mangolkote Block under Burdwan Division, P.H.E. DTE. (Pt.-B) , SM/08707 Retrofitting Extension of pipe line from the existing Distribution System within scheme jurisdiction at Jaggeswardihi village under Jaggeswardihi PWSS under Katwa Sub-Division under Burdwan Division PHE Dte.. [Sl No-03] Assistant Engineer ORD/000606/2021-2022 170/KTS 25/02/2022 7 BABUL SK 2.05 2.02 98.54 1
1792 PURBA BARDHAMAN Burdwan Division Providing Functional House hold Tap Connection (FHTC) by retrofitting at Kaichar, Sitalgram, Haripur and Mathrun mouzas within the command area of Jageswardihi piped Water Supply Scheme at Mangolkote Block under Burdwan Division, P.H.E. DTE. (Pt.-B) , SM/08707 Retrofitting Extension of pipe line at Kaichar Khane Para from the existing Distribution System within scheme jurisdiction under Jaggeswardihi PWSS under Mongalkote Block under Katwa Sub-Division under Burdwan Division PHE Dte. [Sl No-04] Assistant Engineer ORD/000607/2021-2022 171/KTS 25/02/2022 15 BABUL SK 4.64 4.64 100 1
1793 PURBA BARDHAMAN Burdwan Division Providing Functional House hold Tap Connection (FHTC) by retrofitting at Kaichar, Sitalgram, Haripur and Mathrun mouzas within the command area of Jageswardihi piped Water Supply Scheme at Mangolkote Block under Burdwan Division, P.H.E. DTE. (Pt.-B) , SM/08707 Retrofitting Surging of existing tube well at 1st , 2nd and 3rd Tube Well Site at Jaggeswardihi under Jaggeswardihi Piped Water Supply Scheme under Mongalkote Block under Katwa Sub-Division within Burdwan Division, P.H.E.Dte [Sl No-02] Assistant Engineer ORD/000594/2021-2022 149/KTS 23/02/2022 15 PARTHA PRATIM ACHARYA 1.03 1.03 100 1
1794 PURBA BARDHAMAN Burdwan Division Providing Functional House hold Tap Connection (FHTC) by retrofitting at Kaichar, Sitalgram, Haripur and Mathrun mouzas within the command area of Jageswardihi piped Water Supply Scheme at Mangolkote Block under Burdwan Division, P.H.E. DTE. (Pt.-B) , SM/08707 Retrofitting Sinking of 300 X 200mm dia Tube Well 200 mtr. Depth by D.R. Rig method using UPVC pipe (CM) and UPVC Medium Well Screen (RMS) for Augmentation of JAGGESWARDIHI and its adjoining mouzas Piped Water Supply Scheme, Block Mongalkote, Dist - Purba Bardhaman under Burdwan Division, PHE Dte. Assistant Engineer ORD/000535/2022-2023 4959/BWD 09/11/2022 30 ANIRUDDHA FARUQUE 13.08 9.22 70.49 1
1795 PURBA BARDHAMAN Burdwan Division Providing Functional House hold Tap Connection (FHTC) by retrofitting at Kaichar, Sitalgram, Haripur and Mathrun mouzas within the command area of Jageswardihi piped Water Supply Scheme at Mangolkote Block under Burdwan Division, P.H.E. DTE. (Pt.-B) , SM/08707 Retrofitting Construction of Pump House, Boundary walls and Raising Main for Aug. of JAGGESWARDIHI Piped Water Supply Scheme under Mongalkote Block, District:- Purba-Bardhaman. Assistant Engineer JUNIOR ENGINEER R.W.S. BURDWAN SUB-DIVISION PHE DTE ORD/000922/2023-2024 5494/BWD 13/12/2023 60 PAPRI HAZRA 10.13 0.00 0 75
1796 PURBA BARDHAMAN Burdwan Division Providing Functional House hold Tap Connection (FHTC) by retrofitting at Kaichar, Sitalgram, Haripur and Mathrun mouzas within the command area of Jageswardihi piped Water Supply Scheme at Mangolkote Block under Burdwan Division, P.H.E. DTE. (Pt.-B) , SM/08707 Retrofitting Quotation from WBSEDCL for additional T/W at Jaggeswardihi w/s scheme under Burdwan Division, PHE Dte. BILL/00895/2024-2025 1035/JJM 25/10/2024 WBSEDCL 3.22 0.00 0 0
1797 PURBA BARDHAMAN Burdwan Division Providing Functional House hold Tap Connection (FHTC) by retrofitting at Kaichar, Sitalgram, Haripur and Mathrun mouzas within the command area of Jageswardihi piped Water Supply Scheme at Mangolkote Block under Burdwan Division, P.H.E. DTE. (Pt.-B) , SM/08707 Retrofitting Providing FHTC (151 Nos.) of the left out house hold at Ichak habitation including Laying of pipe line from the existing Distribution System within the command area of JAGGESWARDIHI Piped Water Supply Scheme at Mangalkote Block under Katwa Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer ORD/001121/2024-2025 495/BWD 28/01/2025 30 ABDUL HAI 8.30 0.00 0 0
1798 PURBA BARDHAMAN Burdwan Division Providing Functional House hold Tap Connection (FHTC) by retrofitting at Kaichar, Sitalgram, Haripur and Mathrun mouzas within the command area of Jageswardihi piped Water Supply Scheme at Mangolkote Block under Burdwan Division, P.H.E. DTE. (Pt.-B) , SM/08707 Retrofitting Balance works for different type of works in connection with Jaggeswardihi PWSS, Deulia PWSS, Kunda PWSS and Gohagram PWSS Under Mongalkote Block within Katwa Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer ORD/001186/2024-2025 593/BWD 07/02/2025 120 MD HASIN 203.38 0.00 0 0
1799 PURBA BARDHAMAN Burdwan Division Providing Functional House hold Tap Connection (FHTC) by retrofitting at Kaichar, Sitalgram, Haripur and Mathrun mouzas within the command area of Jageswardihi piped Water Supply Scheme at Mangolkote Block under Burdwan Division, P.H.E. DTE. (Pt.-B) , SM/08707 Retrofitting Clearing the compound premises of Head Work Site of Jaggeswardihi PWSS under Block- Mongalkote under Katwa Sub-Division within Burdwan Division PHE Dte. (Sl No-01) Assistant Engineer JUNIOR ENGINEER KATWA SUB-DIVISION PHE DTE ORD/001268/2024-2025 268/KTS 21/02/2025 15 PURBA KANDRA CO. OPERATIVE LABOUR CONTRACT AND CONSTRUCTION SOCIETY LTD. 0.96 0.00 0 100
1800 PURBA BARDHAMAN Jamalpur Burdwan Division GROUND WATER BASED SELIMABAD PIPED WATER SUPPLY SCHEME JAMALPUR BLOCK PURBA BARDHAMAN , SM/11492 New Material Requisition To Resource Division RTOR000052/2022-2023 5524/BWD 23/12/2022 Resource Division 12.41 0.00 0 0
1801 PURBA BARDHAMAN Jamalpur Central Drilling GROUND WATER BASED SELIMABAD PIPED WATER SUPPLY SCHEME JAMALPUR BLOCK PURBA BARDHAMAN , SM/11492 New PROVIDING TUBE WELLMATERIALS CONFORMING TO IS: 12818:2010 WITH OTHER WORKS AT SITE FOR CONSTRUCTION OF TUBE WELL AT SELIMABAD PWSS (TW-I), JAMALPUR BLOCK UNDER PURBA BARDHAMAN, CDD, PHE DTE. ORD/000286/2022-2023 313/CMSD-I 22/07/2022 15 UTTAM KUMAR CHATTERJEE 3.29 3.16 96.05 1
1802 PURBA BARDHAMAN Jamalpur Central Drilling GROUND WATER BASED SELIMABAD PIPED WATER SUPPLY SCHEME JAMALPUR BLOCK PURBA BARDHAMAN , SM/11492 New PROVIDING DRILLING CREWS FOR CONSTRUCTION OF TUBE WELL (250MM X 150MM) BY DEPARTMENTAL RIG MACHINE FOR SELIMABAD PWSS (TW-I), JAMALPUR BLOCK UNDER PURBA BARDAMAN, CDD, PHE DTE. ORD/000285/2022-2023 312/CMSD-I 22/07/2022 15 UTTAM KUMAR CHATTERJEE 1.74 1.38 79.31 1
1803 PURBA BARDHAMAN Jamalpur Central Drilling GROUND WATER BASED SELIMABAD PIPED WATER SUPPLY SCHEME JAMALPUR BLOCK PURBA BARDHAMAN , SM/11492 New PROVIDING PEA SIZE GRAVELS AND BENTONITE POWDER SODIUM BASED AT SITE WITH OTHER WORKS FOR CONSTRUCTION OF TUBE WELL AT SELIMABAD PWSS (TW-I), JAMALPUR BLOCK UNDER PURBA BARDHAMAN, CDD, PHE DTE. ORD/000291/2022-2023 315/CMSD-I 12/07/2022 15 UTTAM KUMAR CHATTERJEE 1.88 1.19 63.3 1
1804 PURBA BARDHAMAN Jamalpur Burdwan Division GROUND WATER BASED SELIMABAD PIPED WATER SUPPLY SCHEME JAMALPUR BLOCK PURBA BARDHAMAN , SM/11492 New Material Requisition To Resource Division RTOR000117/2023-2024 2155/BWD 10/05/2023 Resource Division 5.49 0.00 0 0
1805 PURBA BARDHAMAN Jamalpur Central Mechanical GROUND WATER BASED SELIMABAD PIPED WATER SUPPLY SCHEME JAMALPUR BLOCK PURBA BARDHAMAN , SM/11492 New New service connection charges for Selimabad W/S Scheme TW-1 BILL/00607/2023-2024 BP-2023-24-16 22/05/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 7.37 0.00 0 0
1806 PURBA BARDHAMAN Jamalpur Central Drilling GROUND WATER BASED SELIMABAD PIPED WATER SUPPLY SCHEME JAMALPUR BLOCK PURBA BARDHAMAN , SM/11492 New Providing Drilling crew and other allied works for construction of Tube well (250mm x 150mm) by utilising Departmental machineries for Selimabad PWSS(TW-I), Jamalpur block under Purba Bardhaman District, CDD PHE Dte. ORD/000450/2022-2023 322/CMSD-I(D) 12/07/2022 15 M/S SREEJIT ENTERPRISE 1.73 1.55 89.6 100
1807 PURBA BARDHAMAN Jamalpur Central Drilling GROUND WATER BASED SELIMABAD PIPED WATER SUPPLY SCHEME JAMALPUR BLOCK PURBA BARDHAMAN , SM/11492 New Providing pea size Gravels and Bentonite Powder sodium based at site with other works for construction of Tube well at Selimabad PWSS(TW-II), Jamalpur block under Purba Bardhaman District, CDD PHE Dte. ORD/000451/2022-2023 324/CMSD-I(D) 12/07/2022 15 M/S SREEJIT ENTERPRISE 1.88 1.16 61.7 100
1808 PURBA BARDHAMAN Jamalpur Central Drilling GROUND WATER BASED SELIMABAD PIPED WATER SUPPLY SCHEME JAMALPUR BLOCK PURBA BARDHAMAN , SM/11492 New Providing Tube well materials conforming to IS: 12818:2010 with other works at site for construction of Tube well at Selimabad PWSS(TW-II), Jamalpur block under Purba Bardhaman District, CDD PHE Dte. ORD/000452/2022-2023 321/CMSD-I(D) 12/07/2022 15 M/S SREEJIT ENTERPRISE 3.28 3.24 98.78 100
1809 PURBA BARDHAMAN Jamalpur Central Mechanical GROUND WATER BASED SELIMABAD PIPED WATER SUPPLY SCHEME JAMALPUR BLOCK PURBA BARDHAMAN , SM/11492 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 at Selimabad Water Supply Scheme [ Block- Jamalpur ] under CMD, PHE Dte., Dist.- Purba-Bardhaman ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000611/2022-2023 3117/CMD 23/11/2022 30 M/S. DAS ELECTRIC CO. 11.08 10.67 96.3 80
1810 PURBA BARDHAMAN Jamalpur Central Mechanical GROUND WATER BASED SELIMABAD PIPED WATER SUPPLY SCHEME JAMALPUR BLOCK PURBA BARDHAMAN , SM/11492 New New service connection charges for Selimabad PWSS TW-2 BILL/01523/2023-2024 BP-2023-24-191 09/10/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 5.82 0.00 0 0
1811 PURBA BARDHAMAN Jamalpur Central Drilling GROUND WATER BASED SELIMABAD PIPED WATER SUPPLY SCHEME JAMALPUR BLOCK PURBA BARDHAMAN , SM/11492 New Providing pea size Gravels and Bentonite Powder sodium based at site with other works for construction of tube well at Selimabad PWSS( TW-III),Jamalpur Block under Purba Bardhaman ,Central Drilling Division, P.H.E Dte Driller In Charge Junior Engineer ORD/000064/2023-2024 269/CMSD-I(D) 04/12/2023 15 C.M. ENTERPRISE 1.88 0.39 20.74 100
1812 PURBA BARDHAMAN Jamalpur Central Drilling GROUND WATER BASED SELIMABAD PIPED WATER SUPPLY SCHEME JAMALPUR BLOCK PURBA BARDHAMAN , SM/11492 New Providing Tube well materials Conforming to IS: 12818:2010 with other Works at site for construction of Tube Well at Selimabad PWSS (TW-III),Jamalpur Block under Purba Bardhaman , Central Drilling Division, P.H.E Dte. Driller In Charge Junior Engineer ORD/000065/2023-2024 271/CMSD-I(D) 04/12/2023 15 C.M. ENTERPRISE 3.28 1.20 36.59 100
1813 PURBA BARDHAMAN Jamalpur Central Drilling GROUND WATER BASED SELIMABAD PIPED WATER SUPPLY SCHEME JAMALPUR BLOCK PURBA BARDHAMAN , SM/11492 New Providing drilling crews for construction of TW (250mm x 150mm) by Departmental Rig machine for Selimabad PWSS (TW-III), Jamalpur block under Purba Midnapur, CDD, PHE Dte. Driller In Charge Junior Engineer ORD/000146/2023-2024 270/CMSD-I(D) 04/12/2023 15 C.M. ENTERPRISE 1.73 0.00 0 100
1814 PURBA BARDHAMAN Jamalpur Central Mechanical GROUND WATER BASED SELIMABAD PIPED WATER SUPPLY SCHEME JAMALPUR BLOCK PURBA BARDHAMAN , SM/11492 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-2 at Selimabad Water Supply Scheme [ Block- Jamalpur ] under CMD, PHE Dte., Dist.- Purba-Bardhaman ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000612/2022-2023 3118/CMD 23/11/2022 30 SUBRATA BHADRA 11.07 5.36 48.42 95
1815 PURBA BARDHAMAN Jamalpur Central Mechanical GROUND WATER BASED SELIMABAD PIPED WATER SUPPLY SCHEME JAMALPUR BLOCK PURBA BARDHAMAN , SM/11492 New NEW SERVICE CONNECTION FOR SELIMABAD PWSS. BILL/02698/2023-2024 BP-2023-24-565 23/02/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 0.66 0.00 0 0
1816 PURBA BARDHAMAN Jamalpur Burdwan Division GROUND WATER BASED SELIMABAD PIPED WATER SUPPLY SCHEME JAMALPUR BLOCK PURBA BARDHAMAN , SM/11492 New Quotation from WBSEDCL for new connection charges of Selimabad w/s scheme of T.W.-3 under Burdwan Division, PHE Dte. BILL/01932/2023-2024 1824/JJM 27/03/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LTD. 10.47 0.00 0 0
1817 PURBA BARDHAMAN Jamalpur Burdwan Division GROUND WATER BASED SELIMABAD PIPED WATER SUPPLY SCHEME JAMALPUR BLOCK PURBA BARDHAMAN , SM/11492 New Supply of one no. Diesel / LPG / CNG driven Motor Cab / Maxi Cab (Air Condition) on hire basis for the office of the Executive Engineer, Burdwan Division, P.H.E. Dte. to be used by the Assistant Engineer, Headquarters, P.H.E. Dte. [Period from 01.02.2024 to 31.03.2024] AE(HQs) J.E. 1 BURDWAN ORD/001206/2023-2024 44/AE/HQ 29/01/2024 60 SK. ASRAFUDDIN 0.80 0.00 0 50
1818 PURBA BARDHAMAN Jamalpur Burdwan Division GROUND WATER BASED SELIMABAD PIPED WATER SUPPLY SCHEME JAMALPUR BLOCK PURBA BARDHAMAN , SM/11492 New Continuation work for Supply of one no. Diesel / LPG / CNG driven Motor Cab / Maxi Cab (Air Condition) on hire basis for the office of the Executive Engineer, Burdwan Division, P.H.E. Dte. to be used by the Assistant Engineer, Headquarters, P.H.E. Dte. [Period from 01.04.2024 to 31.05.2024] AE(HQs) J.E. 1 BURDWAN ORD/001232/2023-2024 226/AE/HQ 27/03/2024 60 SK. ASRAFUDDIN 0.80 0.00 0 0
1819 PURBA BARDHAMAN Jamalpur Burdwan Division GROUND WATER BASED SELIMABAD PIPED WATER SUPPLY SCHEME JAMALPUR BLOCK PURBA BARDHAMAN , SM/11492 New Continuation work for Supply of one no. Diesel / LPG / CNG driven Motor Cab / Maxi Cab (Air Condition) on hire basis for the office of the Executive Engineer, Burdwan Division, P.H.E. Dte. to be used by the Assistant Engineer, Headquarters, P.H.E. Dte. [Period from 01.06.2024 to 31.07.2024] AE(HQs) J.E. 1 BURDWAN ORD/000439/2024-2025 304/AE/HQ 31/05/2024 60 SK. ASRAFUDDIN 0.80 0.00 0 0
1820 PURBA BARDHAMAN Jamalpur Central Mechanical GROUND WATER BASED SELIMABAD PIPED WATER SUPPLY SCHEME JAMALPUR BLOCK PURBA BARDHAMAN , SM/11492 New Additional Quotation for new service connection at Selimabad PWSS PH-3. BILL/00460/2024-2025 BP-2024-25-248 01/08/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 0.95 0.00 0 0
1821 PURBA BARDHAMAN Jamalpur Burdwan Division GROUND WATER BASED SELIMABAD PIPED WATER SUPPLY SCHEME JAMALPUR BLOCK PURBA BARDHAMAN , SM/11492 New Augmentation of SELIMABAD Piped Water Supply Scheme with LDS, FHTC, Rising main, Construction of 350 cum capacity OHR with 20.0 mtr. Staging height inclusive of soil investigation including construction of switch-rooms (5.40mx3.6m) & Boundary walls for new TW site under Jamalpur Block, District:- Purba-Burdwan. [Treated as "New Scheme in place of Augmentation" vide Corrigendum Notice No. 1545/CC, dated 02.08.2022.] AE(HQs) J.E. 3 BURDWAN,Junior Engineer, Burdwan Division ORD/000234/2022-2023 3386/BWD 04/08/2022 880 S. DUTTA 435.08 225.16 51.75 70
1822 PURBA BARDHAMAN Jamalpur Burdwan Division GROUND WATER BASED SELIMABAD PIPED WATER SUPPLY SCHEME JAMALPUR BLOCK PURBA BARDHAMAN , SM/11492 New Continuation work for Supply of one no. Diesel / LPG / CNG driven Motor Cab / Maxi Cab (Air Condition) on hire basis for the office of the Executive Engineer, Burdwan Division, P.H.E. Dte. to be used by the Assistant Engineer, Headquarters, P.H.E. Dte. [Period from 01.08.2024 to 30.09.2024] AE(HQs) Contractual Junior Engineer ORD/000506/2024-2025 545/AE/HQ 01/08/2024 60 SK. ASRAFUDDIN 0.80 0.40 50 0
1823 PURBA BARDHAMAN Jamalpur Burdwan Division GROUND WATER BASED SELIMABAD PIPED WATER SUPPLY SCHEME JAMALPUR BLOCK PURBA BARDHAMAN , SM/11492 New Continuation work for Supply of one no. Diesel / LPG / CNG driven Motor Cab / Maxi Cab (Air Condition) on hire basis for the office of the Executive Engineer, Burdwan Division, P.H.E. Dte. to be used by the Assistant Engineer, Headquarters, P.H.E. Dte. [Period from 01.10.2024 to 30.11.2024] AE(HQs) Contractual Junior Engineer ORD/000705/2024-2025 821/AE/HQ 01/10/2024 60 SK. ASRAFUDDIN 0.80 0.70 87.5 0
1824 PURBA BARDHAMAN Jamalpur Central Mechanical GROUND WATER BASED SELIMABAD PIPED WATER SUPPLY SCHEME JAMALPUR BLOCK PURBA BARDHAMAN , SM/11492 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-3 at Selimabad Water Supply Scheme [ Block- Jamalpur ] under CMD, PHE Dte., Dist.- Purba-Bardhaman ASSISTANT ENGINEER Junior Engineer ORD/000615/2022-2023 3119/CMD 23/11/2022 740 MITRA ENTERPRISE 10.73 7.58 70.64 98
1825 PURBA BARDHAMAN Jamalpur Burdwan Division GROUND WATER BASED SELIMABAD PIPED WATER SUPPLY SCHEME JAMALPUR BLOCK PURBA BARDHAMAN , SM/11492 New Continuation work for Supply of one no. Diesel / LPG / CNG driven Motor Cab / Maxi Cab (Air Condition) on hire basis for the office of the Executive Engineer, Burdwan Division, P.H.E. Dte. to be used by the Assistant Engineer, Headquarters, P.H.E. Dte. [Period from 01.12.2024 to 31.01.2025] AE(HQs) Contractual Junior Engineer ORD/000899/2024-2025 1012/AE/HQ 29/11/2024 60 SK. ASRAFUDDIN 0.80 0.40 50 0
1826 PURBA BARDHAMAN Jamalpur Burdwan Division GROUND WATER BASED SELIMABAD PIPED WATER SUPPLY SCHEME JAMALPUR BLOCK PURBA BARDHAMAN , SM/11492 New Continuation work for Supply of one no. Diesel / LPG / CNG driven Motor Cab / Maxi Cab (Air Condition) on hire basis for the office of the Executive Engineer, Burdwan Division, P.H.E. Dte. to be used by the Assistant Engineer, Headquarters, P.H.E. Dte. [Period from 01.04.2025 to 31.05.2025] Contractual Junior Engineer ORD/001406/2024-2025 453/AE/HQ 28/03/2025 60 SK. ASRAFUDDIN 0.80 0.00 0 0
1827 PURBA BARDHAMAN Jamalpur Burdwan Division GROUND WATER BASED SELIMABAD PIPED WATER SUPPLY SCHEME JAMALPUR BLOCK PURBA BARDHAMAN , SM/11492 New Continuation work for Supply of one no. Diesel / LPG / CNG driven Motor Cab / Maxi Cab (Air Condition) on hire basis for the office of the Executive Engineer, Burdwan Division, P.H.E. Dte. to be used by the Assistant Engineer, Headquarters, P.H.E. Dte. [Period from 01.02.2025 to 31.03.2025] AE(HQs) Contractual Junior Engineer ORD/001155/2024-2025 187/AE/HQ 31/01/2025 60 SK. ASRAFUDDIN 0.80 0.00 0 0
1828 PURBA BARDHAMAN Burdwan Division PROVIDING FUNCTIONAL HOUSEHOLD TAP CONNECTION (FHTC) PHASE-II BY AREA OF KASIARA PIPED WATER SUPPLY SCHEME AT MONGALKOTE BLOCK UNDER BURDWAN DIVISION PHE DTE. , SM/12080 Retrofitting Extention of pipe line for providing FHTC from existing Distribuation System within scheme jurisdiction in Kashiara Piped Water Supply Scheme at Gotishta Village within Katwa Sub-Division under Burdwan Division PHE Dte. (Sl -3) Assistant Engineer ORD/000160/2021-2022 663/KTS 28/09/2021 15 MAJUMDER ENTERPRISE 4.84 4.81 99.38 1
1829 PURBA BARDHAMAN Burdwan Division PROVIDING FUNCTIONAL HOUSEHOLD TAP CONNECTION (FHTC) PHASE-II BY AREA OF KASIARA PIPED WATER SUPPLY SCHEME AT MONGALKOTE BLOCK UNDER BURDWAN DIVISION PHE DTE. , SM/12080 Retrofitting Extension of pipe line from the existing Distribution System within scheme jurisdiction at Gopalbera village under KASIYARA PWSS under Katwa Sub-Division under Burdwan Division PHE Dte. [Sl - 1] Assistant Engineer ORD/000158/2021-2022 661/KTS 28/09/2021 15 MAJUMDER ENTERPRISE 1.26 1.23 97.62 1
1830 PURBA BARDHAMAN Burdwan Division PROVIDING FUNCTIONAL HOUSEHOLD TAP CONNECTION (FHTC) PHASE-II BY AREA OF KASIARA PIPED WATER SUPPLY SCHEME AT MONGALKOTE BLOCK UNDER BURDWAN DIVISION PHE DTE. , SM/12080 Retrofitting Extension of pipe line from the existing Distribution System within scheme jurisdiction at Kasiyara and Dirghyasoya village under KASIYARA PWSS under Katwa Sub-Division under Burdwan Division PHE Dte. [Sl - 2] Assistant Engineer ORD/000159/2021-2022 662/KTS 28/09/2021 15 MAJUMDER ENTERPRISE 4.56 4.56 100 1
1831 PURBA BARDHAMAN Burdwan Division PROVIDING FUNCTIONAL HOUSEHOLD TAP CONNECTION (FHTC) PHASE-II BY AREA OF KASIARA PIPED WATER SUPPLY SCHEME AT MONGALKOTE BLOCK UNDER BURDWAN DIVISION PHE DTE. , SM/12080 Retrofitting Connection of CGWB Tube well Raising Main Line of Head Work Site of Kashiyara Piped Water Supply Scheme within Katwa Sub-Division under Burdwan Division, P.H.E. Dte. (Sl No-1) Assistant Engineer ORD/000162/2021-2022 635/KTS 20/09/2021 15 ASMA ENTERPRISE 0.92 0.94 102.17 1
1832 PURBA BARDHAMAN Burdwan Division PROVIDING FUNCTIONAL HOUSEHOLD TAP CONNECTION (FHTC) PHASE-II BY AREA OF KASIARA PIPED WATER SUPPLY SCHEME AT MONGALKOTE BLOCK UNDER BURDWAN DIVISION PHE DTE. , SM/12080 Retrofitting Providing Functional Household Tap Connection at Gopalbera , Gotistha, dirghesoa habitation of Gopalbera , Gotistha, Kashiara village of Chanak and Gotistha G.P. from existing distribution system within the command area of Kashiara PWSS under Mongalkote Block under Katwa Sub-Division under Burdwan Division PHE Dte. (Sl No-01) Assistant Engineer ORD/000590/2021-2022 127/KTS 21/02/2022 30 TAPAS KUMAR ROY 4.83 4.73 97.93 1
1833 PURBA BARDHAMAN Burdwan Division PROVIDING FUNCTIONAL HOUSEHOLD TAP CONNECTION (FHTC) PHASE-II BY AREA OF KASIARA PIPED WATER SUPPLY SCHEME AT MONGALKOTE BLOCK UNDER BURDWAN DIVISION PHE DTE. , SM/12080 Retrofitting Extension of pipe line from the existing Distribution System within scheme jurisdiction at Chanak village under Kashiara PWSS under Mongalkote Block under Katwa Sub-Division under Burdwan Division PHE Dte. _2nd Call [Sl No-01] Assistant Engineer ORD/000076/2022-2023 319/KTS 25/04/2022 21 ASMA ENTERPRISE 0.95 0.92 96.84 1
1834 PURBA BARDHAMAN Burdwan Division PROVIDING FUNCTIONAL HOUSEHOLD TAP CONNECTION (FHTC) PHASE-II BY AREA OF KASIARA PIPED WATER SUPPLY SCHEME AT MONGALKOTE BLOCK UNDER BURDWAN DIVISION PHE DTE. , SM/12080 Retrofitting Road crossing through bituminus PWD road by Jack Pushing method of different location under the command area of KASHIARA (SM/12080, SM/15562) & SIMULIA (SM/18459) PWSS under Mongalkote Block under Katwa Sub Division under Burdwan Division, PHE. Dte. Assistant Engineer ORD/001309/2024-2025 976/BWD 13/03/2025 45 MANASH GHOSH 48.92 0.00 0 0
1835 PURBA BARDHAMAN Purbasthali - I Burdwan Division KAMALPUR PIPED WATER SUPPLY SCHEME , SM/13453 New Material Requisition To Resource Division RTOR000502/2023-2024 4026/BWD 08/09/2023 Resource Division 0.98 0.00 0 0
1836 PURBA BARDHAMAN Purbasthali - I Central Mechanical KAMALPUR PIPED WATER SUPPLY SCHEME , SM/13453 New New service connection charges for Kamalpur PWSS TW-1 BILL/02215/2023-2024 BP-2023-24-388 17/01/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.38 0.00 0 0
1837 PURBA BARDHAMAN Purbasthali - I Central Mechanical KAMALPUR PIPED WATER SUPPLY SCHEME , SM/13453 New New service connection for KAMALPUR PWSS TW-2. BILL/02399/2023-2024 BP-2023-24-501 06/02/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 5.24 0.00 0 0
1838 PURBA BARDHAMAN Purbasthali - I Burdwan Division KAMALPUR PIPED WATER SUPPLY SCHEME , SM/13453 New Different works related (sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of different capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site) to KACHUA & KAMALPUR Piped Water Supply Scheme under Purbasthali ¿ I Block, District:- Purba Bardhaman [NEW SCHEME] Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000133/2023-2024 2344/BWD 22/05/2023 365 CONCORD ENGINEERING 470.92 13.65 2.9 40
1839 PURBA BARDHAMAN Purbasthali - I Burdwan Division KAMALPUR PIPED WATER SUPPLY SCHEME , SM/13453 New Material Requisition To Resource Division RTOR000087/2024-2025 413/BWD 17/01/2025 Resource Division 4.28 0.00 0 0
1840 PURBA BARDHAMAN Purbasthali - I Burdwan Division KAMALPUR PIPED WATER SUPPLY SCHEME , SM/13453 New Different types of works involve in connection with Augmentation of SRIRAMPUR (Zone I & II) (SM/08103), MANGANPUR (SM/13327), KAMALPUR (SM/13453) Piped Water Supply Scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000190/2024-2025 2429/BWD 27/06/2024 480 S.P. CONSTRUCTION 500.89 0.00 0 2
1841 PURBA BARDHAMAN Purbasthali - I Central Mechanical KAMALPUR PIPED WATER SUPPLY SCHEME , SM/13453 New Supply & Installation of Submersible Pumping Machinery , Voltage Stabilizer, Chlorination System and Internal House wiring for Tube well no.- 1 & 2 at KAMALPUR Water Supply Scheme [Block - PURBASTHALI-1] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000813/2023-2024 4095/CMD 29/08/2023 519 MUKHERJEE ART CENTRE 21.40 0.00 0 100
1842 PURBA BARDHAMAN Khandaghosh Burdwan Division KHUNDKURI PIPED WATER SUPPLY SCHEME , SM/13465 New Material Requisition To Resource Division RTOR000074/2022-2023 1253/BWD 17/03/2023 Resource Division 16.58 0.00 0 0
1843 PURBA BARDHAMAN Khandaghosh Burdwan Division KHUNDKURI PIPED WATER SUPPLY SCHEME , SM/13465 New Material Requisition To Resource Division RTOR000106/2022-2023 1631/BWD 06/04/2023 Resource Division 12.19 0.00 0 0
1844 PURBA BARDHAMAN Khandaghosh Central Mechanical KHUNDKURI PIPED WATER SUPPLY SCHEME , SM/13465 New New service connection charges for Khundkuri PWSS TW-2 BILL/01036/2023-2024 BP-2023-24-116 16/08/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 0.65 0.00 0 0
1845 PURBA BARDHAMAN Khandaghosh Central Mechanical KHUNDKURI PIPED WATER SUPPLY SCHEME , SM/13465 New New service connection charges for Khundkuri PWSS TW-1 BILL/01035/2023-2024 BP-2023-24-115 16/08/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 9.93 0.00 0 0
1846 PURBA BARDHAMAN Khandaghosh Burdwan Division KHUNDKURI PIPED WATER SUPPLY SCHEME , SM/13465 New Material Requisition To Resource Division RTOR000705/2023-2024 5046/BWD 23/11/2023 Resource Division 20.46 0.00 0 0
1847 PURBA BARDHAMAN Khandaghosh Burdwan Division KHUNDKURI PIPED WATER SUPPLY SCHEME , SM/13465 New Supply & delivery of different dia. MJ Coller for FHTC as well as smooth running of different W/S. Schemes under Burdwan Division, P.H.E. Dte. [i.e. (1) Magra PWSS, Memari-I Block, (2) Kuchut PWSS, Memari - II Block, (3) Khundkuri PWSS, Khandaghosh Block & (4) Samanti PWSS, Burdwan - II Block)] ORD/000653/2023-2024 4076/BWD 13/09/2023 20 SSPR VALVE MANUFACTURING PVT LTD. 20.63 2.50 12.12 100
1848 PURBA BARDHAMAN Khandaghosh Burdwan Division KHUNDKURI PIPED WATER SUPPLY SCHEME , SM/13465 New Interconnection between pump house and delivery line and Construction of boundary wall at 2nd TW site for KHUDKURI PWSS under Khandaghosh Block, District:- Purba-Bardhaman. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000869/2023-2024 5309/BWD 01/12/2023 60 JYOTI ENTERPRISE 12.63 5.07 40.14 100
1849 PURBA BARDHAMAN Khandaghosh Central Mechanical KHUNDKURI PIPED WATER SUPPLY SCHEME , SM/13465 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at Khundkuri Water Supply Scheme [ Block- Khandogosh ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER Junior Engineer ORD/000052/2023-2024 2513/CMD 02/06/2023 30 RAJIB COMPANY 28.95 11.36 39.24 98
1850 PURBA BARDHAMAN Khandaghosh Burdwan Division KHUNDKURI PIPED WATER SUPPLY SCHEME , SM/13465 New Continuation order for "Supply of one No. Diesel Driven Ambassador Car on hire basis for the office of the Assistant Engineer, Burdwan Sub-Division, PHE Dte for the period of 01.12.2023 to 31.05.2024 Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/001007/2023-2024 2751/BSD 28/11/2023 183 SK.ASFIA 2.40 0.00 0 70
1851 PURBA BARDHAMAN Khandaghosh Central Mechanical KHUNDKURI PIPED WATER SUPPLY SCHEME , SM/13465 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at BICHKHARA & others water supply scheme under Khandoghosh Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman ASSISTANT ENGINEER Junior Engineer ORD/000064/2024-2025 2390/CMD 02/08/2024 90 MS DAS ELECTRIC CO 46.54 0.00 0 0
1852 PURBA BARDHAMAN Khandaghosh Burdwan Division KHUNDKURI PIPED WATER SUPPLY SCHEME , SM/13465 New Repairing damaged concrete road by Cement concrete (mix 1:1.5:3) and drainage system, Sluice valve chamber for FHTC work for KHANDAGHOSH, TARAPOSH, SAGRAI, SANKARI, KHUDKURI, ONARI PWSS and its adjoining mouzas within KHANDAGHOSH BLOCK under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000689/2024-2025 3684/BWD 23/10/2024 90 SUPRIYA RAY 115.68 0.00 0 0
1853 PURBA BARDHAMAN Khandaghosh Burdwan Division KHUNDKURI PIPED WATER SUPPLY SCHEME , SM/13465 New Supply of flow control devices for KHUNDKURI PWSS (SM/13465) under Burdwan Division, PHE Dte. AE(HQs) JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000840/2024-2025 986/AE/HQ 26/11/2024 45 MAKALI ENGINEERING CORPORATION 8.33 0.00 0 0
1854 PURBA BARDHAMAN Khandaghosh Burdwan Division KHUNDKURI PIPED WATER SUPPLY SCHEME , SM/13465 New Field level data validation of FHTC executed by Agencies on the basis of pictorial data with the objective of controlling multiple entry,improving data quality in terms of absolute household by verification through electric connection or any other unique documents and making error free database of KHUNDKURI Pipe Water Supply Scheme in Khandaghosh Block within Burdwan Sub-Division under Burdwan Division,PHE Dte. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000890/2024-2025 2671/BSD 04/12/2024 30 TECHVISION 1.08 0.00 0 0
1855 PURBA BARDHAMAN Khandaghosh Burdwan Division KHUNDKURI PIPED WATER SUPPLY SCHEME , SM/13465 New KHUNDKURI Piped Water Supply Scheme with sinking of Tube-well, LDS, Rising Main, FHTC, Construction of 350 cum capacity RCC OHR with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drain and internal pathway at different TW site under Khandaghosh Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000753/2022-2023 1217/BWD 16/03/2023 747 M/S JAN MAHAMMAD 510.97 238.78 46.73 85
1856 PURBA BARDHAMAN Burdwan Division Providing Water Supply Arrangement by Sinking of Tube Well at left out Primary Schools(290 nos) for 100% School Coverage in Purba Bardhaman within Kalna Sub Division under Burdwan Division P.H.E. DTE. , SM/11283 School Material Requisition To Resource Division RTOR000049/2022-2023 5398/BWD 12/12/2022 Resource Division 85.00 0.00 0 0
1857 PURBA BARDHAMAN Burdwan Division Providing Water Supply Arrangement by Sinking of Tube Well at left out Primary Schools(290 nos) for 100% School Coverage in Purba Bardhaman within Kalna Sub Division under Burdwan Division P.H.E. DTE. , SM/11283 School Sinking of 100mtr. deep 100 × 40mm tubewell for providing water supply arrangement in Schools under Monteswar Block (47 Nos School) within Purba Bardhaman District under Burdwan Division, PHE Dte. (Part-C). Assistant Engineer ORD/000324/2022-2023 3661/BWD 29/08/2022 45 MITHU BUILDERS 52.73 45.16 85.64 0
1858 PURBA BARDHAMAN Burdwan Division Providing Water Supply Arrangement by Sinking of Tube Well at left out Primary Schools(290 nos) for 100% School Coverage in Purba Bardhaman within Kalna Sub Division under Burdwan Division P.H.E. DTE. , SM/11283 School Sinking of 100mtr. deep 100 × 40mm tubewell for providing water supply arrangement in Schools under Purbasthali ¿ I Block (36 Nos School) within Purba Bardhaman District under Burdwan Division, PHE Dte. Assistant Engineer ORD/000192/2022-2023 3418/BWD 05/08/2022 30 HAMID SK 40.56 36.13 89.08 0
1859 PURBA BARDHAMAN Burdwan Division Providing Water Supply Arrangement by Sinking of Tube Well at left out Primary Schools(290 nos) for 100% School Coverage in Purba Bardhaman within Kalna Sub Division under Burdwan Division P.H.E. DTE. , SM/11283 School Sinking of 100mtr. deep 100 × 40mm tubewell for providing water supply arrangement in Schools under Purbasthali II Block (16 Nos School) within Purba Bardhaman District under Burdwan Division, PHE Dte. Assistant Engineer ORD/000289/2022-2023 3595/BWD 17/08/2022 30 INVENT ENGINEERS CO. OPERATIVE SOCIETY LTD. 17.90 16.44 91.84 0
1860 PURBA BARDHAMAN Burdwan Division Providing Water Supply Arrangement by Sinking of Tube Well at left out Primary Schools(290 nos) for 100% School Coverage in Purba Bardhaman within Kalna Sub Division under Burdwan Division P.H.E. DTE. , SM/11283 School Sinking of 100mtr. deep 100 × 40mm tubewell for providing water supply arrangement in Schools under Kalna-I Block (43 Nos School) within Purba Bardhaman District under Burdwan Division, PHE Dte._2ND CALL. Assistant Engineer ORD/000363/2022-2023 3806/BWD 02/09/2022 45 INVENT ENGINEERS CO. OPERATIVE SOCIETY LTD. 48.36 40.52 83.79 100
1861 PURBA BARDHAMAN Burdwan Division Providing Water Supply Arrangement by Sinking of Tube Well at left out Primary Schools(290 nos) for 100% School Coverage in Purba Bardhaman within Kalna Sub Division under Burdwan Division P.H.E. DTE. , SM/11283 School Material Requisition To Resource Division RTOR000025/2022-2023 3300/BWD 29/07/2022 Resource Division 104.70 0.00 0 0
1862 PURBA BARDHAMAN Burdwan Division Providing Water Supply Arrangement by Sinking of Tube Well at left out Primary Schools(290 nos) for 100% School Coverage in Purba Bardhaman within Kalna Sub Division under Burdwan Division P.H.E. DTE. , SM/11283 School Sinking of 100mtr. deep 100 × 40mm tubewell for providing water supply arrangement in Schools under Monteswar Block (50 Nos School) within Purba Bardhaman District under Burdwan Division, PHE Dte. (Part-B). Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000306/2022-2023 3665/BWD 29/08/2022 45 SUKALPA NIRMAN 56.36 26.00 46.13 50
1863 PURBA BARDHAMAN Burdwan Division Providing Water Supply Arrangement by Sinking of Tube Well at left out Primary Schools(290 nos) for 100% School Coverage in Purba Bardhaman within Kalna Sub Division under Burdwan Division P.H.E. DTE. , SM/11283 School Sinking of 100mtr. deep 100 × 40mm tubewell for providing water supply arrangement in Schools under Monteswar Block (50 Nos School) within Purba Bardhaman District under Burdwan Division, PHE Dte. (Part-A). Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000307/2022-2023 3662/BWD 29/08/2022 45 SUPRIYA RAY 56.36 0.00 0 100
1864 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED DEWANDIGHI MIRJAPUR PWSS TO ACCOMMODATE FHTC IN BURDWAN-I BLOCK UNDER BURDWAN SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/09494 Augmentation Supply of materials for different water supply scheme under Burdwan Division, PHE Dte. VCH/001578/2021-2022 1207/DW 10/03/2022 EXECUTIVE ENGINEER, RESOURCES DIVISION, P.H.E. DTE. 3,005.00 0.00 0 0
1865 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED DEWANDIGHI MIRJAPUR PWSS TO ACCOMMODATE FHTC IN BURDWAN-I BLOCK UNDER BURDWAN SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/09494 Augmentation Route Survey & Preparation of DPR for Dewandighi-Mirzapur W/S Scheme under Burdwan-I Block under Burdwan Sub-Division under Burdwan Division PHE Dte. Sl No.5. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000493/2021-2022 180/BSD 31/01/2022 30 RADIANT 2.51 2.50 99.6 1
1866 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED DEWANDIGHI MIRJAPUR PWSS TO ACCOMMODATE FHTC IN BURDWAN-I BLOCK UNDER BURDWAN SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/09494 Augmentation Supply and delivery of different dia. CIDF sluice valve for Augmentation of Paharhati, Nababhat, Shyamsundar & Dewandighi-Mirzapur Piped Water Supply Scheme within Burdwan Sub-Division under Burdwan Division, P.H.E. Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000519/2022-2023 4703/BWD 19/10/2022 20 SSPR VALVE MANUFACTURING PVT LTD. 14.45 3.61 24.98 1
1867 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED DEWANDIGHI MIRJAPUR PWSS TO ACCOMMODATE FHTC IN BURDWAN-I BLOCK UNDER BURDWAN SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/09494 Augmentation Allied work for Augmentation of DEWANDIGHI PWSS under Burdwan-I Block of Burdwan Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000744/2022-2023 1168/BWD 14/03/2023 45 BOSE ENTERPRISE 50.01 46.23 92.44 100
1868 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED DEWANDIGHI MIRJAPUR PWSS TO ACCOMMODATE FHTC IN BURDWAN-I BLOCK UNDER BURDWAN SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/09494 Augmentation Material Requisition To Resource Division RTOR000056/2021-2022 560/BWD 27/01/2022 Resource Division 11.04 0.00 0 0
1869 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED DEWANDIGHI MIRJAPUR PWSS TO ACCOMMODATE FHTC IN BURDWAN-I BLOCK UNDER BURDWAN SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/09494 Augmentation Material Requisition To Resource Division RTOR000215/2021-2022 1538/BWD 15/03/2022 Resource Division 0.37 0.00 0 0
1870 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED DEWANDIGHI MIRJAPUR PWSS TO ACCOMMODATE FHTC IN BURDWAN-I BLOCK UNDER BURDWAN SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/09494 Augmentation Material Requisition To Resource Division RTOR000087/2021-2022 881/BWD 11/02/2022 Resource Division 13.26 0.00 0 0
1871 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED DEWANDIGHI MIRJAPUR PWSS TO ACCOMMODATE FHTC IN BURDWAN-I BLOCK UNDER BURDWAN SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/09494 Augmentation Augmentation of DEWANDIGHI Piped Water Supply Scheme with LDS, FHTC, Rising main with necessary interconnection, Construction of 200 cum capacity OHR with 20.0 mtr. Staging height inclusive of soil investigation under Burdwan-I Block, District:- Purba-Burdwan. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. Junior Engineer, Burdwan Sadar Sub-Division ORD/000026/2022-2023 2055/BWD 19/04/2022 365 SHREE J.M. CONSTRUCTION 213.62 186.15 87.14 100
1872 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED DEWANDIGHI MIRJAPUR PWSS TO ACCOMMODATE FHTC IN BURDWAN-I BLOCK UNDER BURDWAN SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/09494 Augmentation Balance Work for extension of pipe lines to provide FHTC With Sinking of Tub well , Construction of pump house with Boundary wall & other related work for TALIT-SIMDAL (SM/18112), NABABHAT (SM-15166) and DEWANDIGHI-MIRJAPUR (SM/09494) PWSS under Burdwan Sub-Div., Block -Bwn-1, under Burdwan Division PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/001248/2024-2025 793/BWD 03/03/2025 120 M/S S.S. ENTERPRISE 227.66 0.00 0 0
1873 PURBA BARDHAMAN Bhatar Burdwan Division BALSIDANGA PIPED WATER SUPPLY SCHEME , SM/13904 New Material Requisition To Resource Division RTOR000006/2023-2024 1962/BWD 25/04/2023 Resource Division 14.19 0.00 0 0
1874 PURBA BARDHAMAN Bhatar Burdwan Division BALSIDANGA PIPED WATER SUPPLY SCHEME , SM/13904 New Material Requisition To Resource Division RTOR000158/2023-2024 2155/BWD 10/05/2023 Resource Division 9.50 0.00 0 0
1875 PURBA BARDHAMAN Bhatar Central Mechanical BALSIDANGA PIPED WATER SUPPLY SCHEME , SM/13904 New New service connection charges for Balsidanga PWSS TW-1 BILL/00774/2023-2024 BP-2023-24-71 21/07/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 5.28 0.00 0 0
1876 PURBA BARDHAMAN Bhatar Burdwan Division BALSIDANGA PIPED WATER SUPPLY SCHEME , SM/13904 New Material Requisition To Resource Division RTOR000754/2023-2024 5256/BWD 30/11/2023 Resource Division 18.50 0.00 0 0
1877 PURBA BARDHAMAN Bhatar Central Mechanical BALSIDANGA PIPED WATER SUPPLY SCHEME , SM/13904 New ADDITIONAL QUOTATION NEW SERVICE CONNECTION FOR BALSIDNAGA PWSS TW -1. BILL/03105/2023-2024 BP-2023-24-645 15/03/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 1.04 0.00 0 0
1878 PURBA BARDHAMAN Bhatar Central Mechanical BALSIDANGA PIPED WATER SUPPLY SCHEME , SM/13904 New Quotation for new service connection at Balsidanga PWSS PH-2. BILL/00388/2024-2025 BP-2024-25-203 18/07/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 8.09 0.00 0 0
1879 PURBA BARDHAMAN Bhatar Central Mechanical BALSIDANGA PIPED WATER SUPPLY SCHEME , SM/13904 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Karjana & others water supply scheme under Bhatar Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000067/2024-2025 2394/CMD 02/08/2024 90 AHALYA ENGINEERING WORKS 82.00 0.00 0 0
1880 PURBA BARDHAMAN Bhatar Burdwan Division BALSIDANGA PIPED WATER SUPPLY SCHEME , SM/13904 New Sinking of 250 X 150 mm dia Tubewell, Construction of pump House, Connection with pump house and Modification to distribution network by making a loop and extension with uPVC pipe to augment the water supply to FHTC at Beldanga and Kanchgoria village of BALSHIDANGA W/S Scheme under Durgapur Sub-Division, Burdwan Division, P.H.E. Dte. Assistant Engineer, Durgapur Sub Division, P.H.E. Dte JUNIOR ENGINEER DURGAPUR SUB-DIVISION PHE DTE ORD/001220/2023-2024 1017/BWD 07/03/2024 60 BAMDEB CONSTRUCTION & CO 40.65 0.00 0 100
1881 PURBA BARDHAMAN Bhatar Burdwan Division BALSIDANGA PIPED WATER SUPPLY SCHEME , SM/13904 New Additional work for BALSIDANGA Piped Water Supply Scheme with FHTC & approach road with bullah pilling under Bhatar Block, District:- Purba Bardhaman [New SCHEME]. Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000573/2024-2025 3314/BWD 06/09/2024 90 KALYAN CHOWDHURY 14.81 0.00 0 0
1882 PURBA BARDHAMAN Bhatar Burdwan Division BALSIDANGA PIPED WATER SUPPLY SCHEME , SM/13904 New BALSIDANGA Piped Water Supply Scheme with sinking of Tube-well, LDS, Rising Main, FHTC & construction of switch rooms & boundary walls with gates and land development, drain and internal pathway at different TW site under BHATAR Block, District:- Purba-Bardhaman [NEW SCHEME]. Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer ORD/000793/2022-2023 1443/BWD 24/03/2023 90 G.S. CONSTRUCTION & CO. 60.82 26.97 44.34 100
1883 PURBA BARDHAMAN Bhatar Central Mechanical BALSIDANGA PIPED WATER SUPPLY SCHEME , SM/13904 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at Balsidanga Water Supply Scheme [ Block- Bhatar ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000137/2023-2024 2818/CMD 04/07/2023 640 M/S. SWAPAN BANERJEE 26.97 0.00 0 60
1884 PURBA BARDHAMAN Khandaghosh Burdwan Division GUIR PIPED WATER SUPPLY SCHEME IN KHANDOGHOSH BLOCK , SM/13424 New Material Requisition To Resource Division RTOR000073/2023-2024 1962/BWD 25/04/2023 Resource Division 3.93 0.00 0 0
1885 PURBA BARDHAMAN Khandaghosh Burdwan Division GUIR PIPED WATER SUPPLY SCHEME IN KHANDOGHOSH BLOCK , SM/13424 New Material Requisition To Resource Division RTOR000175/2023-2024 2155/BWD 10/05/2023 Resource Division 13.07 0.00 0 0
1886 PURBA BARDHAMAN Khandaghosh Central Mechanical GUIR PIPED WATER SUPPLY SCHEME IN KHANDOGHOSH BLOCK , SM/13424 New New service connection charges for Guir PWSS TW-2 BILL/00799/2023-2024 BP-2023-24-84 26/07/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 5.96 0.00 0 0
1887 PURBA BARDHAMAN Khandaghosh Central Mechanical GUIR PIPED WATER SUPPLY SCHEME IN KHANDOGHOSH BLOCK , SM/13424 New New service connection charges for Guir PWSS TW 1 BILL/00817/2023-2024 BP-2023-24-96 02/08/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 4.97 0.00 0 0
1888 PURBA BARDHAMAN Khandaghosh Burdwan Division GUIR PIPED WATER SUPPLY SCHEME IN KHANDOGHOSH BLOCK , SM/13424 New Material Requisition To Resource Division RTOR000716/2023-2024 5268/BWD 30/11/2023 Resource Division 21.07 0.00 0 0
1889 PURBA BARDHAMAN Khandaghosh Central Mechanical GUIR PIPED WATER SUPPLY SCHEME IN KHANDOGHOSH BLOCK , SM/13424 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at Guir Water Supply Scheme [ Block- Khandogosh ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER Junior Engineer ORD/000142/2023-2024 2855/CMD 05/07/2023 30 M/S GHOSH ENTERPRISE 28.95 11.30 39.03 90
1890 PURBA BARDHAMAN Khandaghosh Central Mechanical GUIR PIPED WATER SUPPLY SCHEME IN KHANDOGHOSH BLOCK , SM/13424 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at BICHKHARA & others water supply scheme under Khandoghosh Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman ASSISTANT ENGINEER Junior Engineer ORD/000064/2024-2025 2390/CMD 02/08/2024 90 MS DAS ELECTRIC CO 46.54 0.00 0 0
1891 PURBA BARDHAMAN Khandaghosh Burdwan Division GUIR PIPED WATER SUPPLY SCHEME IN KHANDOGHOSH BLOCK , SM/13424 New GUIR Piped Water Supply Scheme with sinking of Tube-well, LDS, Rising Main, FHTC, Construction of 300 cum capacity RCC OHR with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drain and internal pathway at different TW site under Khandaghosh Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer1, Durgapur Sub-Division, PHE Dte.,Junior Engineer2, Durgapur Sub-Division, PHE Dte. ORD/000018/2023-2024 1732/BWD 13/04/2023 629 UNIQUE AGENCY 531.21 161.51 30.4 40
1892 PURBA BARDHAMAN Khandaghosh Burdwan Division GUIR PIPED WATER SUPPLY SCHEME IN KHANDOGHOSH BLOCK , SM/13424 New Material Requisition To Resource Division RTOR000060/2024-2025 386/BWD 17/01/2025 Resource Division 1.93 0.00 0 0
1893 PURBA BARDHAMAN Khandaghosh Burdwan Division GUIR PIPED WATER SUPPLY SCHEME IN KHANDOGHOSH BLOCK , SM/13424 New Supply of Inspection Vehicle for inspection of different JJM related (Schemes) works as and when required including supply of driver & fuel (minimum 8 Hours duty per day) and all taxes etc. for Durgapur Sub-Division under Burdwan Division, P.H.E. Dte.consider 96.00 Km. run per day [Period February'2024 to April'2024] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer2, Durgapur Sub-Division, PHE Dte. ORD/001233/2023-2024 91/DSD 31/01/2024 78 MD HASIN 1.00 0.29 29 0
1894 PURBA BARDHAMAN Khandaghosh Burdwan Division GUIR PIPED WATER SUPPLY SCHEME IN KHANDOGHOSH BLOCK , SM/13424 New Continuation for the work of Supply of Inspection Vehicle for inspection of different JJM related (Schemes) works as and when required including supply of driver & fuel (minimum 8 Hours duty per day) and all taxes etc. for Durgapur Sub-Division under BurdwanDivision, P.H.E. Dte.consider 96.00 Km. run per day [Period May'2024 to July'2024] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000255/2024-2025 369/DSD 30/04/2024 78 MD HASIN 1.00 0.29 29 0
1895 PURBA BARDHAMAN Khandaghosh Burdwan Division GUIR PIPED WATER SUPPLY SCHEME IN KHANDOGHOSH BLOCK , SM/13424 New Balance work for providing Functional Household Tap Connection (FHTC) within the command area KHEJURHATI & GUIR W/S. Scheme of Khandaghosh Block under Burdwan Division, PHE. Dte. Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/001217/2024-2025 724/BWD 24/02/2025 120 ROY CONSTRUCTION 153.99 0.00 0 0
1896 PURBA BARDHAMAN Memari - I Burdwan Division BIJRA PIPED WATER SUPPLY SCHEME , SM/13426 New Material Requisition To Resource Division RTOR000260/2023-2024 2197/BWD 12/05/2023 Resource Division 16.43 0.00 0 0
1897 PURBA BARDHAMAN Memari - I Burdwan Division BIJRA PIPED WATER SUPPLY SCHEME , SM/13426 New Material Requisition To Resource Division RTOR000464/2023-2024 3988/BWD 08/09/2023 Resource Division 1.04 0.00 0 0
1898 PURBA BARDHAMAN Memari - I Burdwan Division BIJRA PIPED WATER SUPPLY SCHEME , SM/13426 New Material Requisition To Resource Division RTOR000657/2023-2024 5115/BWD 23/11/2023 Resource Division 20.46 0.00 0 0
1899 PURBA BARDHAMAN Memari - I Central Mechanical BIJRA PIPED WATER SUPPLY SCHEME , SM/13426 New Electric quotation for New Service Connection at Bijra W/S Scehem PH-I. BILL/01779/2023-2024 BP-2023-24-282 26/12/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 6.34 0.00 0 0
1900 PURBA BARDHAMAN Memari - I Central Mechanical BIJRA PIPED WATER SUPPLY SCHEME , SM/13426 New New electric connection for Bijra PWSS, PH-2. BILL/01876/2023-2024 BP-2023-24-342 11/01/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 7.97 0.00 0 0
1901 PURBA BARDHAMAN Memari - I Burdwan Division BIJRA PIPED WATER SUPPLY SCHEME , SM/13426 New Continuation work for Supply of one no. Diesel / LPG / CNG driven Motor Cab / Maxi Cab (Air Condition) on hire basis for the office of the Superintending Engineer, Central Circle, P.H.E. Dte." [Period from 01.12.2023 to 31.01.2024] AE(HQs) J.E. 1 BURDWAN ORD/001207/2023-2024 921/AE/HQ 30/11/2023 60 SOURAV JANA 0.80 0.00 0 50
1902 PURBA BARDHAMAN Memari - I Central Mechanical BIJRA PIPED WATER SUPPLY SCHEME , SM/13426 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at SAHAPUR & others water supply scheme under Memari-I Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. ASSISTANT ENGINEER Junior Engineer ORD/000100/2024-2025 2392/CMD 02/08/2024 90 MITRA ENTERPRISE 47.62 0.00 0 0
1903 PURBA BARDHAMAN Memari - I Central Mechanical BIJRA PIPED WATER SUPPLY SCHEME , SM/13426 New Additional quotation for new service connection at Bijra PWSS BILL/01027/2024-2025 BP-2024-25-383 14/11/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 0.24 0.00 0 0
1904 PURBA BARDHAMAN Memari - I Central Mechanical BIJRA PIPED WATER SUPPLY SCHEME , SM/13426 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at BIJRA Water Supply Scheme [ Block- MEMARI-1 ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER Junior Engineer ORD/000806/2023-2024 4091/CMD 29/08/2023 491 ORIENTAL ENGINEERING CO. 29.39 0.00 0 95
1905 PURBA BARDHAMAN Memari - I Burdwan Division BIJRA PIPED WATER SUPPLY SCHEME , SM/13426 New Different works related (sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of different capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site) to DEHA & BIJRA Piped Water Supply Scheme under Memari I Block, District:- Purba Bardhaman [NEW SCHEME] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000092/2023-2024 2215/BWD 15/05/2023 870 CONCORD ENGINEERING 868.87 54.13 6.23 60
1906 PURBA BARDHAMAN Khandaghosh Burdwan Division PUNSHUR PIPED WATER SUPPLY SCHEME IN KHANDOGHOSH BLOCK , SM/13450 New Material Requisition To Resource Division RTOR000076/2022-2023 1254/BWD 17/03/2023 Resource Division 4.93 0.00 0 0
1907 PURBA BARDHAMAN Khandaghosh Burdwan Division PUNSHUR PIPED WATER SUPPLY SCHEME IN KHANDOGHOSH BLOCK , SM/13450 New Material Requisition To Resource Division RTOR000104/2022-2023 1634/BWD 06/04/2023 Resource Division 0.76 0.00 0 0
1908 PURBA BARDHAMAN Khandaghosh Central Mechanical PUNSHUR PIPED WATER SUPPLY SCHEME IN KHANDOGHOSH BLOCK , SM/13450 New Shifting of 25KVA DTR at Punshur Water Supply Scheme BILL/00608/2023-2024 BP-2023-24-17 02/06/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 2.88 0.00 0 0
1909 PURBA BARDHAMAN Khandaghosh Central Mechanical PUNSHUR PIPED WATER SUPPLY SCHEME IN KHANDOGHOSH BLOCK , SM/13450 New New service connection charges of Punshur W/S Scheme TW-1 BILL/00676/2023-2024 BP-2023-24-21 21/06/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.29 0.00 0 0
1910 PURBA BARDHAMAN Khandaghosh Central Mechanical PUNSHUR PIPED WATER SUPPLY SCHEME IN KHANDOGHOSH BLOCK , SM/13450 New New service connection charges of Punshur W/S Scheme TW-2 BILL/00677/2023-2024 BP-2023-24-22 21/06/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 2.80 0.00 0 0
1911 PURBA BARDHAMAN Khandaghosh Burdwan Division PUNSHUR PIPED WATER SUPPLY SCHEME IN KHANDOGHOSH BLOCK , SM/13450 New Material Requisition To Resource Division RTOR000704/2023-2024 5039/BWD 23/11/2023 Resource Division 20.46 0.00 0 0
1912 PURBA BARDHAMAN Khandaghosh Burdwan Division PUNSHUR PIPED WATER SUPPLY SCHEME IN KHANDOGHOSH BLOCK , SM/13450 New PUNSUR Piped Water Supply Scheme with sinking of Tube-well, LDS, Rising Main, FHTC, Construction of 150 cum capacity RCC OHR with 20.0 mtr. with Staging height including soil investigation & construction of switch-rooms & boundary walls at different TW site under KHANDOGOSH Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer1, Durgapur Sub-Division, PHE Dte.,Junior Engineer2, Durgapur Sub-Division, PHE Dte. ORD/000637/2022-2023 162/BWD 11/01/2023 365 TIRUPATI ENTERPRISES 278.54 126.68 45.48 75
1913 PURBA BARDHAMAN Khandaghosh Central Mechanical PUNSHUR PIPED WATER SUPPLY SCHEME IN KHANDOGHOSH BLOCK , SM/13450 New Supply & installation works for Punsur PWSS. BILL/02564/2023-2024 BP-2023-24-547 20/02/2024 M/S. SWAPAN BANERJEE 11.87 0.00 0 0
1914 PURBA BARDHAMAN Khandaghosh Central Mechanical PUNSHUR PIPED WATER SUPPLY SCHEME IN KHANDOGHOSH BLOCK , SM/13450 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at Punsur Water Supply Scheme [ Block- Khandogosh ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER Junior Engineer ORD/000043/2023-2024 2495/CMD 01/06/2023 30 M/S. SWAPAN BANERJEE 28.94 11.33 39.15 100
1915 PURBA BARDHAMAN Khandaghosh Central Mechanical PUNSHUR PIPED WATER SUPPLY SCHEME IN KHANDOGHOSH BLOCK , SM/13450 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at BICHKHARA & others water supply scheme under Khandoghosh Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman ASSISTANT ENGINEER Junior Engineer ORD/000064/2024-2025 2390/CMD 02/08/2024 90 MS DAS ELECTRIC CO 46.54 0.00 0 0
1916 PURBA BARDHAMAN Khandaghosh Burdwan Division PUNSHUR PIPED WATER SUPPLY SCHEME IN KHANDOGHOSH BLOCK , SM/13450 New Supply of Inspection Vehicle for inspection of different JJM related (Schemes) works as and when required including supply of driver & fuel (minimum 8 Hours duty per day) and all taxes etc. for Durgapur Sub-Division under Burdwan Division, P.H.E. Dte.consider 96.00 Km. run per day [Period February'2024 to April'2024] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer2, Durgapur Sub-Division, PHE Dte. ORD/001233/2023-2024 91/DSD 31/01/2024 78 MD HASIN 1.00 0.29 29 0
1917 PURBA BARDHAMAN Khandaghosh Burdwan Division PUNSHUR PIPED WATER SUPPLY SCHEME IN KHANDOGHOSH BLOCK , SM/13450 New Continuation for the work of Supply of Inspection Vehicle for inspection of different JJM related (Schemes) works as and when required including supply of driver & fuel (minimum 8 Hours duty per day) and all taxes etc. for Durgapur Sub-Division under BurdwanDivision, P.H.E. Dte.consider 96.00 Km. run per day [Period May'2024 to July'2024] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000255/2024-2025 369/DSD 30/04/2024 78 MD HASIN 1.00 0.33 33 0
1918 PURBA BARDHAMAN Raina - II Burdwan Division GROUND WATER BASED CHAK BATASPURR SINGLE VILLAGE PIPED WATER SUPPPLY SCHEME , SM/13495 New Material Requisition To Resource Division RTOR000240/2023-2024 2197/BWD 12/05/2023 Resource Division 7.00 0.00 0 0
1919 PURBA BARDHAMAN Raina - II Central Mechanical GROUND WATER BASED CHAK BATASPURR SINGLE VILLAGE PIPED WATER SUPPPLY SCHEME , SM/13495 New New service connection charges for Chak Baraspur PWSS TW-1 BILL/00884/2023-2024 BP-2023-24-107 09/08/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.19 0.00 0 0
1920 PURBA BARDHAMAN Raina - II Burdwan Division GROUND WATER BASED CHAK BATASPURR SINGLE VILLAGE PIPED WATER SUPPPLY SCHEME , SM/13495 New Material Requisition To Resource Division RTOR000526/2023-2024 4315/BWD 29/09/2023 Resource Division 0.83 0.00 0 0
1921 PURBA BARDHAMAN Raina - II Burdwan Division GROUND WATER BASED CHAK BATASPURR SINGLE VILLAGE PIPED WATER SUPPPLY SCHEME , SM/13495 New Material Requisition To Resource Division RTOR000659/2023-2024 5117/BWD 23/11/2023 Resource Division 18.94 0.00 0 0
1922 PURBA BARDHAMAN Raina - II Burdwan Division GROUND WATER BASED CHAK BATASPURR SINGLE VILLAGE PIPED WATER SUPPPLY SCHEME , SM/13495 New CHAK BATASPUR Single Village Scheme with sinking of Tube-well, LDS, Rising Main, FHTC & construction of switch rooms & boundary walls with gates and land development, drain and internal pathway at different TW site under Raina-II Block, District:- Purba-Bardhaman [NEW SCHEME]. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000085/2023-2024 2115/BWD 10/05/2023 90 ANWESHA CONSTRUCTION 63.63 24.61 38.68 100
1923 PURBA BARDHAMAN Raina - II Burdwan Division GROUND WATER BASED CHAK BATASPURR SINGLE VILLAGE PIPED WATER SUPPPLY SCHEME , SM/13495 New Beautification of PWSS with Arboriculture, Recharge Pit including shaft and approach footway to Pump-House. Facelifting of masonary works at ANGUNA-BATASPUR (Raina-I Block) P.W.S.S under Burdwan Division, PHE Dte. ASSISTANT ENGINEER R.W.S. BURDWAN SUB-DIVISION PHE DTE JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000361/2024-2025 230/RWS 25/07/2024 10 DAS ENTERPRISE 0.97 0.00 0 0
1924 PURBA BARDHAMAN Raina - II Burdwan Division GROUND WATER BASED CHAK BATASPURR SINGLE VILLAGE PIPED WATER SUPPPLY SCHEME , SM/13495 New Beautification of PWSS with Arboriculture at Chak Bataspur and Recharge Pit including shaft & anciliary works at Head Works site and Repair and colour at 2nd Tubewell site of Kaity (Raina-II Block) P.W.S.S under Burdwan Division, PHE Dte. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000366/2024-2025 236/RWS 30/07/2024 10 ANWESHA CONSTRUCTION 0.97 0.00 0 0
1925 PURBA BARDHAMAN Raina - II Central Mechanical GROUND WATER BASED CHAK BATASPURR SINGLE VILLAGE PIPED WATER SUPPPLY SCHEME , SM/13495 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Satinandi,Sanko & others water supply scheme under Galsi-1 Block ; Serpur, Uchalan & others water supply scheme under Raina-2 Block and maro, loapur & others water supply scheme under Galsi-2 block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000397/2024-2025 2751/CMD 24/09/2024 90 ORIENTAL ENGINEERING CO. 88.42 0.00 0 0
1926 PURBA BARDHAMAN Raina - II Central Mechanical GROUND WATER BASED CHAK BATASPURR SINGLE VILLAGE PIPED WATER SUPPPLY SCHEME , SM/13495 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at CHAK BATASPUR Water Supply Scheme [ Block-RAINA-2] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000165/2023-2024 2930/CMD 12/07/2023 232 CONCORD ENGINEERING 28.98 5.73 19.77 40
1927 PURBA BARDHAMAN Manteswar Burdwan Division SIGHNALI PIPED WATER SUPPLY SCHEME. , SM/13496 New Material Requisition To Resource Division RTOR000321/2023-2024 2197/BWD 12/05/2023 Resource Division 15.55 0.00 0 0
1928 PURBA BARDHAMAN Manteswar Burdwan Division SIGHNALI PIPED WATER SUPPLY SCHEME. , SM/13496 New Material Requisition To Resource Division RTOR000453/2023-2024 3977/BWD 08/09/2023 Resource Division 38.31 0.00 0 0
1929 PURBA BARDHAMAN Manteswar Central Mechanical SIGHNALI PIPED WATER SUPPLY SCHEME. , SM/13496 New New service connection for SIGHNALI PWSS TW 1. BILL/02445/2023-2024 BP-2023-24-519 09/02/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.24 0.00 0 0
1930 PURBA BARDHAMAN Manteswar Central Mechanical SIGHNALI PIPED WATER SUPPLY SCHEME. , SM/13496 New NEW SERVICE CONNECTION FOR SIGHNALI PWSS. BILL/02692/2023-2024 BP-2023-24-571 27/02/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 9.01 0.00 0 0
1931 PURBA BARDHAMAN Manteswar Burdwan Division SIGHNALI PIPED WATER SUPPLY SCHEME. , SM/13496 New Different works related (sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of different capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site) to PASCHIM KHARAMPUR, SHUSHNA & SIGHNALI Piped Water Supply Scheme under Manteswar Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer1, Durgapur Sub-Division, PHE Dte. ORD/000482/2023-2024 3494/BWD 09/08/2023 511 S.P. CONSTRUCTION 1,925.07 0.00 0 60
1932 PURBA BARDHAMAN Manteswar Central Mechanical SIGHNALI PIPED WATER SUPPLY SCHEME. , SM/13496 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Sutra & others water supply scheme under Monteswar Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000068/2024-2025 2396/CMD 02/08/2024 455 SINHA ELECTRICALS 78.06 0.00 0 20
1933 PURBA BARDHAMAN Manteswar Central Mechanical SIGHNALI PIPED WATER SUPPLY SCHEME. , SM/13496 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at Sighnali Water Supply Scheme [ Block- Monteshwar ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000743/2023-2024 4053/CMD 29/08/2023 611 ASHIM UDYOG 27.76 0.00 0 100
1934 PURBA BARDHAMAN Ausgram - II Burdwan Division JALKANDAR PIPED WATER SUPPLY SCHEME , SM/14953 New Material Requisition To Resource Division RTOR000054/2023-2024 1962/BWD 25/04/2023 Resource Division 73.04 0.00 0 0
1935 PURBA BARDHAMAN Ausgram - II Burdwan Division JALKANDAR PIPED WATER SUPPLY SCHEME , SM/14953 New Material Requisition To Resource Division RTOR000289/2023-2024 2197/BWD 12/05/2023 Resource Division 16.34 0.00 0 0
1936 PURBA BARDHAMAN Ausgram - II Burdwan Division JALKANDAR PIPED WATER SUPPLY SCHEME , SM/14953 New Material Requisition To Resource Division RTOR000615/2023-2024 4878/BWD 10/11/2023 Resource Division 30.36 0.00 0 0
1937 PURBA BARDHAMAN Ausgram - II Central Mechanical JALKANDAR PIPED WATER SUPPLY SCHEME , SM/14953 New New service connection charges for Jalkandar PWSS TW-1 BILL/01781/2023-2024 BP-2023-24-290 26/12/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 7.59 0.00 0 0
1938 PURBA BARDHAMAN Ausgram - II Central Mechanical JALKANDAR PIPED WATER SUPPLY SCHEME , SM/14953 New Quotation for new service connection at Jalikandar W/S Scheme for PH No-2 BILL/01824/2023-2024 BP-2023-24-330 03/01/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 2.52 0.00 0 0
1939 PURBA BARDHAMAN Ausgram - II Central Mechanical JALKANDAR PIPED WATER SUPPLY SCHEME , SM/14953 New Supply & Installation of Submersible Pumping Machinery, and piping works for Tube well No.- 2 at JALKHANDAR Water Supply Scheme [ Block- AUSGRAM-2] under CMD, PHE Dte,. Dist.- Purba-Bardhaman. Driller In-Charge ORD/001628/2023-2024 40/DIC/BMSD(D) 15/01/2024 15 H.K. DAS & CO. 0.38 0.00 0 0
1940 PURBA BARDHAMAN Ausgram - II Central Mechanical JALKANDAR PIPED WATER SUPPLY SCHEME , SM/14953 New Supply & Delivery of actuator valve for Tube Well No: 02 at JALKHANDAR Water Supply Scheme [Block- AUSGRAM -2] under CMD, PHE Dte., Dist.- Purba-Bardhaman. Driller In-Charge JUNIOR ENGINEER ORD/001634/2023-2024 100/DIC/BMSD(D) 12/02/2024 7 H.K. DAS & CO. 0.97 0.00 0 0
1941 PURBA BARDHAMAN Ausgram - II Central Mechanical JALKANDAR PIPED WATER SUPPLY SCHEME , SM/14953 New Supply & delivery of the following Electrical & Mechanical accessories for Tube well No.- 2 at JALKHANDAR Water Supply Scheme [ Block- AUSGRAM-2) under CMD, PHE Dte,. Dist.- Purba-Bardhaman. Driller In-Charge JUNIOR ENGINEER ORD/001625/2023-2024 23/DIC/BMSD(D) 05/01/2024 7 H.K. DAS & CO. 0.93 0.00 0 0
1942 PURBA BARDHAMAN Ausgram - II Central Mechanical JALKANDAR PIPED WATER SUPPLY SCHEME , SM/14953 New Supply & Delivery of Submersible Pumping Machinery for Tube well No.- 2 at JALKHANDAR Water Supply Scheme [Block- AUSGRAM -2] under CMD, PHE Dte.,Dist.- Purba-Bardhaman. Driller In-Charge JUNIOR ENGINEER ORD/001623/2023-2024 349/DIC/BMSD(D) 22/12/2023 7 H.K. DAS & CO. 0.80 0.00 0 0
1943 PURBA BARDHAMAN Ausgram - II Central Mechanical JALKANDAR PIPED WATER SUPPLY SCHEME , SM/14953 New Supply & delivery of Electrical & Mechanical accessories for Tube well No.- 2 at JALKHANDAR Water Supply Scheme [ Block- AUSGRAM-2] under CMD, PHE Dte., Dist.· Purba Bardhaman. Driller In-Charge JUNIOR ENGINEER ORD/001631/2023-2024 45/DIC/BMSD(D) 19/01/2024 7 H.K. DAS & CO. 0.63 0.00 0 0
1944 PURBA BARDHAMAN Ausgram - II Central Mechanical JALKANDAR PIPED WATER SUPPLY SCHEME , SM/14953 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at JALKANDAR Water Supply Scheme [ Block- AUSGRAM-2] under CMD, PHE Dte., Dist.- Purba-Bardhaman. Driller In-Charge JUNIOR ENGINEER ORD/000916/2023-2024 4180/CMD 29/08/2023 30 SOUNAK ENTERPRISE 28.48 0.00 0 96
1945 PURBA BARDHAMAN Ausgram - II Central Mechanical JALKANDAR PIPED WATER SUPPLY SCHEME , SM/14953 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Chora, Kalaijhuti & others water supply scheme under Ausgram-2 Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. Driller In-Charge JUNIOR ENGINEER ORD/000143/2024-2025 2405/CMD 02/08/2024 90 NABAUDYOG ELECTRICAL ENGINEERING CO-OPERATIVE SOCIETY LTD 95.26 0.00 0 0
1946 PURBA BARDHAMAN Ausgram - II Durgapur W/S Division JALKANDAR PIPED WATER SUPPLY SCHEME , SM/14953 New Acceptance cum Formal Work Order for Additional work of Concrete Road & Bituminous Road Restoration, Laying of M.S Pipe, FHTC , Land development of H/W Site,drain & internal Path Way, Concrete Road & Bituminous Road Restoration, Laying of M.S Pipe, and necessary allied Works of JALKANDAR and BHUYERA PWSS (JJM) under Durgapur Water Supply Division, PHE Dte. Assistant Engineer-I JUNIOR ENGINEER-2 ORD/000187/2024-2025 1593/DWSD 25/11/2024 60 MANGES INDUSTRIAL CORPORATION 36.51 0.00 0 0
1947 PURBA BARDHAMAN Ausgram - II Durgapur W/S Division JALKANDAR PIPED WATER SUPPLY SCHEME , SM/14953 New Acceptance cum Formal Work Order for Sinking of 300 X 200mm dia Tube Well,Pump House , Boundary Wall , Concrete Road & Bituminous Road Restoration,Jack Pushing with Laying of M.S Pipe, FHTC , Land development of H/W Site,drain & internal Path Way, Laying of M.S Pipe under JALKANDAR and BHUYERA PWSS (JJM) Block - Ausgram -II, District:- Purba-Bardhaman, Under Durgapur W/S Division , PHE Dte. Assistant Engineer-I JUNIOR ENGINEER-2 ORD/000172/2024-2025 1614/DWSD 26/11/2024 90 GHOSH & ROY ENTERPRISE 92.46 0.00 0 0
1948 PURBA BARDHAMAN Ausgram - II Burdwan Division JALKANDAR PIPED WATER SUPPLY SCHEME , SM/14953 New Different works related (sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of different capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site) to BHUYERA & JALIKANDAR Piped Water Supply Scheme under Ausgram-II Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer ORD/000491/2023-2024 3509/BWD 10/08/2023 773 MANGES INDUSTRIAL CORPORATION 950.78 0.00 0 60
1949 PURBA BARDHAMAN Ausgram - II Durgapur W/S Division JALKANDAR PIPED WATER SUPPLY SCHEME , SM/14953 New FORMAL WORK ORDER FOR Balance and additional works for sinking of 300X200 mm dia X 210 mtr deapth RRM Tube well and laying pipe line (LDS),FHTC, Construction of Switch Room,Pump House,Inter Connection along with road restoration and construction of Boundary wall for head worksites and other allieds work related to JJM (7 Nos PWSS) i.e. Aushgram PWSS, Jalkandar and Bhuyera PWSS, Karatia PWSS, Khandari PWSS, Pichkuri PWSS, Shibda PWSS under Aushgram-I and II,Galsi-I and II Block under DURGAPUR W/S DIVISION,PHE Dte. Assistant Engineer-I,Assistant Engineer-II Contractual Junior Engineer_1,Contractual Junior Engineer_2,Contractual Junior Engineer_3,Contractual Junior Engineer_4,Contractual Junior Engineer_5,JUNIOR ENGINEER-1,JUNIOR ENGINEER-2,Junior Engineer_3 ORD/000286/2024-2025 493/DWSD 19/03/2025 185 MANASH GHOSH 745.87 0.00 0 0
1950 PURBA BARDHAMAN Kalna - I Burdwan Division PATHARDANGA PIPED WATER SUPPLY SCHEME , SM/14440 New Material Requisition To Resource Division RTOR000088/2022-2023 1242/BWD 17/03/2023 Resource Division 17.57 0.00 0 0
1951 PURBA BARDHAMAN Kalna - I Burdwan Division PATHARDANGA PIPED WATER SUPPLY SCHEME , SM/14440 New Material Requisition To Resource Division RTOR000103/2022-2023 1636/BWD 06/04/2023 Resource Division 4.20 0.00 0 0
1952 PURBA BARDHAMAN Kalna - I Burdwan Division PATHARDANGA PIPED WATER SUPPLY SCHEME , SM/14440 New Material Requisition To Resource Division RTOR000498/2023-2024 4022/BWD 08/09/2023 Resource Division 34.67 0.00 0 0
1953 PURBA BARDHAMAN Kalna - I Central Mechanical PATHARDANGA PIPED WATER SUPPLY SCHEME , SM/14440 New New service connection charges for Pathardanga PWSS TW-2 BILL/01530/2023-2024 BP-2023-24-198 13/10/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 4.06 0.00 0 0
1954 PURBA BARDHAMAN Kalna - I Burdwan Division PATHARDANGA PIPED WATER SUPPLY SCHEME , SM/14440 New Work Order for Supply of 1 (one) No. Diesel driven Motor cab on hire basis for the Office of the Assistant Engineer, under Kalna Sub-Division within Burdwan Division, P.H.E. Dte. [Period from 01.07.2023 to 31.12.2023] ORD/000898/2023-2024 825/KSD 28/06/2023 184 PARTHA PRATIM ACHARYA 0.00 0.00 NAN 0
1955 PURBA BARDHAMAN Kalna - I Central Mechanical PATHARDANGA PIPED WATER SUPPLY SCHEME , SM/14440 New New Service connection for Pathardanga W/S Scheme PH No.-1 BILL/01803/2023-2024 BP-2023-24-307 30/12/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 6.44 0.00 0 0
1956 PURBA BARDHAMAN Kalna - I Burdwan Division PATHARDANGA PIPED WATER SUPPLY SCHEME , SM/14440 New Work Order for "CONSTRUCTION OF TEMPORARY KIOSK FOR THE NECESSARY ARRANGEMENT OF ELECTRIFICATION OF TUBEWELL UNDER PATHARDANGA PWSS AND TAIPARA PWSS UNDER KALNA SUB-DIVISION UNDER BURDWAN DIVISION, PHE DTE. (2 UNITS:- 1 NO FOR PATHARDANGA PWSS & 1 NO FOR TAIPARA PWSS)" Assistant Engineer Junior Engineer, R.W.S. Burdwan Sub Division, P.H.E. Dt ORD/001141/2023-2024 1977/KSD 09/02/2024 10 BISWAS ENTERPRISE 0.66 0.00 0 100
1957 PURBA BARDHAMAN Kalna - I Central Mechanical PATHARDANGA PIPED WATER SUPPLY SCHEME , SM/14440 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at PATHARDANGA Water Supply Scheme [ Block- KALNA-1] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000690/2023-2024 4016/CMD 29/08/2023 30 M/S, S.S. ENTERPRISE. 29.61 0.00 0 60
1958 PURBA BARDHAMAN Kalna - I Central Mechanical PATHARDANGA PIPED WATER SUPPLY SCHEME , SM/14440 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Joykrishnapur & others water supply scheme under Purbasthali-2,jamalpur,kalna 1 Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000101/2024-2025 2398/CMD 02/08/2024 90 MS S G ENTERPRISE 53.43 0.00 0 0
1959 PURBA BARDHAMAN Kalna - I Burdwan Division PATHARDANGA PIPED WATER SUPPLY SCHEME , SM/14440 New Different works related (sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of different capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site) to DEARA, PATHARDANGA & SHIKARPUR Piped Water Supply Scheme under KALNA-I Block, District:- Purba Bardhaman [NEW SCHEME] Assistant Engineer Junior Engineer, R.W.S. Burdwan Sub Division, P.H.E. Dt ORD/000734/2022-2023 1004/BWD 06/03/2023 365 M/S TAPAS KUMAR CHAKRABORTY 1,584.09 91.62 5.78 75
1960 PURBA BARDHAMAN Kalna - I Burdwan Division PATHARDANGA PIPED WATER SUPPLY SCHEME , SM/14440 New Work order for "Restoration of pipeline with other allied works at different places of Ghanashyampur mouja under Pathardanga Pwss due to construction of rcc cover drain & widening of rcc concrete road constructed by PRI body under Kalna-I panchayat samiti under Kalna Sub-Division under Burdwan Division, PHE Dte.". Assistant Engineer Junior Engineer, R.W.S. Burdwan Sub Division, P.H.E. Dt ORD/000861/2024-2025 1846/KSD 27/11/2024 15 M/S TAPAS KUMAR CHAKRABORTY 4.22 0.00 0 100
1961 PURBA BARDHAMAN Kalna - I Burdwan Division PATHARDANGA PIPED WATER SUPPLY SCHEME , SM/14440 New Work order for "Restoration of pipeline with other allied works at different places of Rampur mouja under Pathardanga Pwss due to construction of rcc cover drain & widening of rcc concrete road constructed by PRI body under Kalna-I panchayat samiti under Kalna Sub-Division under Burdwan Division, PHE Dte." Assistant Engineer Junior Engineer, R.W.S. Burdwan Sub Division, P.H.E. Dt ORD/000864/2024-2025 1849/KSD 27/11/2024 15 M/S TAPAS KUMAR CHAKRABORTY 3.66 0.00 0 100
1962 PURBA BARDHAMAN Kalna - I Burdwan Division PATHARDANGA PIPED WATER SUPPLY SCHEME , SM/14440 New Supply & Laying of 300mm Dia M.S.E.R.W Pipe including Jack Pushing along with other allied work in connection with different Augmentation & New [(SM/18439, SM/14437, SM/14435, SM/07805, SM/14440, SM/15571, SM/08030, SM/16014, SM/15588, SM/16298 & SM/16307)] under Kalna Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/001187/2024-2025 608/BWD 11/02/2025 180 MANASH GHOSH 1,209.62 0.00 0 0
1963 PURBA BARDHAMAN Kalna - I Burdwan Division PATHARDANGA PIPED WATER SUPPLY SCHEME , SM/14440 New Work Order for "Restoration of pipeline with other allied works at different places of Indrapur mouja under Patahrdanga Pwss due to construction of rcc cover drain & widening of rcc concrete road constructed by PRI body under Kalna-I panchayat samiti under Kalna Sub-Division under Burdwan Division, PHE Dte." Assistant Engineer Junior Engineer, R.W.S. Burdwan Sub Division, P.H.E. Dt ORD/000523/2024-2025 966/KSD 31/07/2024 10 M/S TAPAS KUMAR CHAKRABORTY 3.12 0.00 0 100
1964 PURBA BARDHAMAN Kalna - I Burdwan Division PATHARDANGA PIPED WATER SUPPLY SCHEME , SM/14440 New Work Order for "Restoration of pipeline with other allied works at different places of parshapur mouja under Patahrdanga Pwss due to construction of rcc cover drain & widening of rcc concrete road constructed by PRI body under Kalna-I panchayat samiti under Kalna Sub-Division under Burdwan Division, PHE Dte.". Assistant Engineer Junior Engineer, R.W.S. Burdwan Sub Division, P.H.E. Dt ORD/000524/2024-2025 967/KSD 31/07/2024 10 M/S TAPAS KUMAR CHAKRABORTY 2.21 0.00 0 100
1965 PURBA BARDHAMAN Kalna - I Burdwan Division PATHARDANGA PIPED WATER SUPPLY SCHEME , SM/14440 New Work order for " Restoration of pipeline with other allied works at different places of Pathardanga mouja under Pathardanga Pwss due to construction of rcc cover drain & widening of rcc concrete road constructed by PRI body under Kalna-I panchayat samiti under Kalna Sub-Division under Burdwan Division, PHE Dte.". Assistant Engineer Junior Engineer, R.W.S. Burdwan Sub Division, P.H.E. Dt ORD/000862/2024-2025 1847/KSD 27/11/2024 15 M/S TAPAS KUMAR CHAKRABORTY 4.14 0.00 0 100
1966 PURBA BARDHAMAN Kalna - I Burdwan Division PATHARDANGA PIPED WATER SUPPLY SCHEME , SM/14440 New Work order for "Restoration of pipeline with other allied works at different places of Beshbati mouja of Pathardanga Pwss due to construction of rcc cover drain & widening of rcc concrete road constructed by PRI body under Kalna-I panchayat samiti under Kalna Sub-Division under Burdwan Division, PHE Dte.". Assistant Engineer Junior Engineer, R.W.S. Burdwan Sub Division, P.H.E. Dt ORD/000867/2024-2025 1852/KSD 27/11/2024 15 M/S TAPAS KUMAR CHAKRABORTY 3.58 0.00 0 100
1967 PURBA BARDHAMAN Bhatar Burdwan Division NASIGRAM PIPED WATER SUPPLY SCHEME , SM/14443 New Material Requisition To Resource Division RTOR000071/2023-2024 1962/BWD 25/04/2023 Resource Division 27.18 0.00 0 0
1968 PURBA BARDHAMAN Bhatar Burdwan Division NASIGRAM PIPED WATER SUPPLY SCHEME , SM/14443 New Material Requisition To Resource Division RTOR000176/2023-2024 2155/BWD 10/05/2023 Resource Division 17.06 0.00 0 0
1969 PURBA BARDHAMAN Bhatar Central Mechanical NASIGRAM PIPED WATER SUPPLY SCHEME , SM/14443 New New service connection charges for Nasigram PWSS TW-2 BILL/00773/2023-2024 BP-2023-24-73 21/07/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.19 0.00 0 0
1970 PURBA BARDHAMAN Bhatar Central Mechanical NASIGRAM PIPED WATER SUPPLY SCHEME , SM/14443 New New service connection charges for Nasigram PWSS TW-1 BILL/00772/2023-2024 BP-2023-24-72 21/07/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 5.83 0.00 0 0
1971 PURBA BARDHAMAN Bhatar Burdwan Division NASIGRAM PIPED WATER SUPPLY SCHEME , SM/14443 New Material Requisition To Resource Division RTOR000583/2023-2024 4897/BWD 10/11/2023 Resource Division 38.94 0.00 0 0
1972 PURBA BARDHAMAN Bhatar Burdwan Division NASIGRAM PIPED WATER SUPPLY SCHEME , SM/14443 New Supply of Inspection Vehicle for inspection of different JJM related (Schemes) works as and when required including supply of driver & fuel (minimum 8 Hours duty per day) and all taxes etc. for Durgapur Sub-Division under Burdwan Division, P.H.E. Dte. consider 96.00 Km. run per day.[Period from 01/08/2023 to 31/10/2023] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer2, Durgapur Sub-Division, PHE Dte. ORD/000420/2023-2024 593/DSD 31/07/2023 66 AFIBS ENTERPRISE 0.85 0.83 97.65 100
1973 PURBA BARDHAMAN Bhatar Central Mechanical NASIGRAM PIPED WATER SUPPLY SCHEME , SM/14443 New NEW SERVICE CONNECTION FOR NASIGRAM PWSS BILL/02592/2023-2024 BP-2023-24-574 27/02/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 5.54 0.00 0 0
1974 PURBA BARDHAMAN Bhatar Burdwan Division NASIGRAM PIPED WATER SUPPLY SCHEME , SM/14443 New Continuation Supply of Inspection Vehicle for inspection of different JJM related (Schemes) works as and when required including supply of driver & fuel (minimum 8 Hours duty per day) and all taxes etc. for Durgapur Sub-Division under Burdwan Division, P.H.E. Dte. consider 96.00 Km. run per day.[Period from 01/11/2023 to 31/01/2024] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer2, Durgapur Sub-Division, PHE Dte. ORD/000755/2023-2024 825/DSD 31/10/2023 66 AFIBS ENTERPRISE 0.85 0.00 0 100
1975 PURBA BARDHAMAN Bhatar Burdwan Division NASIGRAM PIPED WATER SUPPLY SCHEME , SM/14443 New Continuation Supply of Inspection Vehicle for inspection of different JJM related (Schemes) works as and when required including supply of driver & fuel (minimum 8 Hours duty per day) and all taxes etc. for Durgapur Sub-Division under Burdwan Division, P.H.E. Dte. consider 96.00 Km. run per day.[Period from 01/11/2023 to 31/01/2024] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer2, Durgapur Sub-Division, PHE Dte. ORD/001210/2023-2024 825/DSD 31/10/2023 66 AFIBS ENTERPRISE 0.85 0.00 0 100
1976 PURBA BARDHAMAN Bhatar Central Mechanical NASIGRAM PIPED WATER SUPPLY SCHEME , SM/14443 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Karjana & others water supply scheme under Bhatar Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000067/2024-2025 2394/CMD 02/08/2024 90 AHALYA ENGINEERING WORKS 82.00 0.00 0 0
1977 PURBA BARDHAMAN Bhatar Central Mechanical NASIGRAM PIPED WATER SUPPLY SCHEME , SM/14443 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1, 2 & 3 at NASIGRAM Water Supply Scheme [ Block- BHATAR ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000141/2023-2024 2856/CMD 05/07/2023 30 M/S. S.R. ENTERPRISE 41.65 0.00 0 90
1978 PURBA BARDHAMAN Bhatar Burdwan Division NASIGRAM PIPED WATER SUPPLY SCHEME , SM/14443 New Making connection with 4th tube well, Construction of Plinth protection of OHR, Restoration of road and FHTC (The rest portion) of Bara Belun Water Supply Scheme at Bara Belun village & Providing Functional Household Tap Connection (FHTC) within the command area of NASIGRAM Piped W/S. Scheme within Bhatar Block under Burdwan Division, PHE. Dte. Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer2, Durgapur Sub-Division, PHE Dte. ORD/000690/2024-2025 3685/BWD 23/10/2024 120 INDIAN ENGINEERS CO.-OPERATIVE SOCIETY LTD. 91.48 0.00 0 0
1979 PURBA BARDHAMAN Bhatar Burdwan Division NASIGRAM PIPED WATER SUPPLY SCHEME , SM/14443 New NASIGRAM Piped Water Supply Scheme with sinking of Tube-well, LDS, Rising Main, FHTC, Construction of 450 cum capacity RCC OHR with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drain and internal pathway at different TW site under Bhatar Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer1, Durgapur Sub-Division, PHE Dte.,Junior Engineer2, Durgapur Sub-Division, PHE Dte. ORD/000050/2023-2024 1826/BWD 19/04/2023 742 MD HASIN 742.95 161.47 21.73 50
1980 PURBA BARDHAMAN Bhatar Burdwan Division CHHATINI PIPED WATER SUPPLY SCHEME , SM/14017 New Material Requisition To Resource Division RTOR000074/2023-2024 1962/BWD 25/04/2023 Resource Division 56.53 0.00 0 0
1981 PURBA BARDHAMAN Bhatar Burdwan Division CHHATINI PIPED WATER SUPPLY SCHEME , SM/14017 New Material Requisition To Resource Division RTOR000311/2023-2024 2197/BWD 12/05/2023 Resource Division 19.47 0.00 0 0
1982 PURBA BARDHAMAN Bhatar Central Mechanical CHHATINI PIPED WATER SUPPLY SCHEME , SM/14017 New New service connection charges for Chhatini PWSS TW-1 BILL/01049/2023-2024 BP-2023-24-118 16/08/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 2.96 0.00 0 0
1983 PURBA BARDHAMAN Bhatar Burdwan Division CHHATINI PIPED WATER SUPPLY SCHEME , SM/14017 New Material Requisition To Resource Division RTOR000584/2023-2024 4928/BWD 10/11/2023 Resource Division 34.57 0.00 0 0
1984 PURBA BARDHAMAN Bhatar Central Mechanical CHHATINI PIPED WATER SUPPLY SCHEME , SM/14017 New New Service connection at CHHATINI PWSS TW-2. BILL/02368/2023-2024 BP-2023-24-480 31/01/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.24 0.00 0 0
1985 PURBA BARDHAMAN Bhatar Burdwan Division CHHATINI PIPED WATER SUPPLY SCHEME , SM/14017 New Providing Functional Household Tap Connection (FHTC) by sinking of tube well 250 x 150 mm. dia., Constn. of Pump House & Boundary Wall within command area of CHHATINI W/S. Scheme, Bhatar Block under Burdwan Division, PHE. Dte. Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer2, Durgapur Sub-Division, PHE Dte. ORD/000401/2024-2025 3033/BWD 06/08/2024 120 SAHA CONSTRUCTION & CO. 129.06 0.00 0 0
1986 PURBA BARDHAMAN Bhatar Central Mechanical CHHATINI PIPED WATER SUPPLY SCHEME , SM/14017 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Karjana & others water supply scheme under Bhatar Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000067/2024-2025 2394/CMD 02/08/2024 90 AHALYA ENGINEERING WORKS 82.00 0.00 0 0
1987 PURBA BARDHAMAN Bhatar Burdwan Division CHHATINI PIPED WATER SUPPLY SCHEME , SM/14017 New CHHATINI Piped Water Supply Scheme with sinking of Tube-well, LDS, Rising Main, FHTC, Construction of 400 cum capacity RCC OHR with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drain and internal pathway at different TW site under Bhatar Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer2, Durgapur Sub-Division, PHE Dte. ORD/000093/2023-2024 2216/BWD 15/05/2023 687 SHWET BARANI 539.35 0.00 0 42
1988 PURBA BARDHAMAN Bhatar Central Mechanical CHHATINI PIPED WATER SUPPLY SCHEME , SM/14017 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at Chhatini Water Supply Scheme [ Block- Bhatar ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000212/2023-2024 3069/CMD 21/07/2023 30 SUNRISE ENGINEERING CORPORATION 27.79 0.00 0 60
1989 PURBA BARDHAMAN Bhatar Burdwan Division CHHATINI PIPED WATER SUPPLY SCHEME , SM/14017 New Supply of Inspection Vehicle for inspection of different JJM related (Schemes) works as and when required including supply of driver & fuel (minimum 8 Hours duty per day) and all taxes etc. for Durgapur Sub-Division under Burdwan Division, P.H.E. Dte.consider 96.00 Km. run per day [Period February'2024 to April'2024] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer2, Durgapur Sub-Division, PHE Dte. ORD/001233/2023-2024 91/DSD 31/01/2024 78 MD HASIN 1.00 0.29 29 0
1990 PURBA BARDHAMAN Bhatar Burdwan Division CHHATINI PIPED WATER SUPPLY SCHEME , SM/14017 New Continuation for the work of Supply of Inspection Vehicle for inspection of different JJM related (Schemes) works as and when required including supply of driver & fuel (minimum 8 Hours duty per day) and all taxes etc. for Durgapur Sub-Division under BurdwanDivision, P.H.E. Dte.consider 96.00 Km. run per day [Period May'2024 to July'2024] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000255/2024-2025 369/DSD 30/04/2024 78 MD HASIN 1.00 0.33 33 0
1991 PURBA BARDHAMAN Katwa - II Burdwan Division MULGRAM PIPED WATER SUPPLY SCHEME , SM/14058 New Material Requisition To Resource Division RTOR000057/2022-2023 1236/BWD 17/03/2023 Resource Division 13.55 0.00 0 0
1992 PURBA BARDHAMAN Katwa - II Burdwan Division MULGRAM PIPED WATER SUPPLY SCHEME , SM/14058 New Material Requisition To Resource Division RTOR000092/2022-2023 1630/BWD 06/04/2023 Resource Division 1.65 0.00 0 0
1993 PURBA BARDHAMAN Katwa - II Central Mechanical MULGRAM PIPED WATER SUPPLY SCHEME , SM/14058 New New service connection charges for Mulgram W/S Scheme TW-1 BILL/00695/2023-2024 BP-2023-24-37 27/06/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 4.76 0.00 0 0
1994 PURBA BARDHAMAN Katwa - II Burdwan Division MULGRAM PIPED WATER SUPPLY SCHEME , SM/14058 New Material Requisition To Resource Division RTOR000637/2023-2024 5092/BWD 23/11/2023 Resource Division 24.47 0.00 0 0
1995 PURBA BARDHAMAN Katwa - II Central Mechanical MULGRAM PIPED WATER SUPPLY SCHEME , SM/14058 New New service connection charges for Mulgram PWSS TW-2 BILL/01763/2023-2024 BP-2023-24-273 21/12/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 4.26 0.00 0 0
1996 PURBA BARDHAMAN Katwa - II Burdwan Division MULGRAM PIPED WATER SUPPLY SCHEME , SM/14058 New MULGRAM Piped Water Supply Scheme with sinking of Tube-well, LDS, Rising Main, FHTC, Construction of 300 cum capacity RCC OHR with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drain and internal pathway at different TW site under KATWA -II Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer JUNIOR ENGINEER KATWA SUB-DIVISION PHE DTE ORD/000685/2022-2023 482/BWD 08/02/2023 365 RADIANT 475.42 218.00 45.85 98
1997 PURBA BARDHAMAN Katwa - II Central Mechanical MULGRAM PIPED WATER SUPPLY SCHEME , SM/14058 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Mulgram & others water supply scheme under Katwa-II Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. ASSISTANT ENGINEER Junior Engineer ORD/000070/2024-2025 2409/CMD 02/08/2024 90 DUTTA ENTERPRISE 50.18 0.00 0 0
1998 PURBA BARDHAMAN Katwa - II Burdwan Division MULGRAM PIPED WATER SUPPLY SCHEME , SM/14058 New Balance work of OHR, construction Concrete Road, Functional Household Tap Connection, Road restoration etc. for Mulgram PWSS, under KATWA -II Block under Katwa Sub-Division under Burdwan Division, PHED, District:- Purba-Bardhaman. Assistant Engineer ORD/000502/2024-2025 3157/BWD 22/08/2024 90 RADIANT 66.62 0.00 0 0
1999 PURBA BARDHAMAN Katwa - II Central Mechanical MULGRAM PIPED WATER SUPPLY SCHEME , SM/14058 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at Mulgram Water Supply Scheme [ Block- KATWA-2 ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. Driller In-Charge Junior Engineer ORD/000049/2023-2024 2511/CMD 02/06/2023 30 M/S. S.R. ENTERPRISE 28.96 5.70 19.68 40
2000 PURBA BARDHAMAN Katwa - II Central Mechanical MULGRAM PIPED WATER SUPPLY SCHEME , SM/14058 New Supply and installation of Electro-Magnetic flow meter at AURIA, KARUI & others water supply scheme under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. Driller In-Charge JUNIOR ENGINEER ORD/000602/2024-2025 3106/CMD 11/12/2024 60 S.K. ELECTRICALS 13.60 0.00 0 0
2001 PURBA BARDHAMAN Burdwan - II Burdwan Division Kusha Piped Water Supply Scheme , SM/13279 New Material Requisition To Resource Division RTOR000069/2022-2023 1250/BWD 17/03/2023 Resource Division 6.52 0.00 0 0
2002 PURBA BARDHAMAN Burdwan - II Burdwan Division Kusha Piped Water Supply Scheme , SM/13279 New Material Requisition To Resource Division RTOR000013/2023-2024 1962/BWD 25/04/2023 Resource Division 2.48 0.00 0 0
2003 PURBA BARDHAMAN Burdwan - II Central Mechanical Kusha Piped Water Supply Scheme , SM/13279 New New Service connection charges for Kusha W/S Scheme TW-I BILL/00573/2023-2024 BP-2023-24-9 12/05/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 9.07 0.00 0 0
2004 PURBA BARDHAMAN Burdwan - II Central Mechanical Kusha Piped Water Supply Scheme , SM/13279 New New Service connection charges for Kusha W/S Scheme TW-II BILL/00574/2023-2024 BP-2023-24-10 12/05/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 0.41 0.00 0 0
2005 PURBA BARDHAMAN Burdwan - II Central Mechanical Kusha Piped Water Supply Scheme , SM/13279 New Hiring of Inspection Vehicle (Diesel/CNG/LPG Driven) for supervision of site for the office of Assistant Engineer, under C.M.D. P.H.E. Dte. w.e.f.-01/07/2023 to 31/08/2023. [Under JJM Works]. ASSISTANT ENGINEER Junior Engineer ORD/000321/2023-2024 523/A/CMSD-I 28/06/2023 62 SUBRATA BHADRA 0.79 0.76 96.2 50
2006 PURBA BARDHAMAN Burdwan - II Burdwan Division Kusha Piped Water Supply Scheme , SM/13279 New Additional laying distribution system work for KUSHA W/S. Scheme under Burdwan - II Block within Burdwan Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. Junior Engineer, Burdwan Sadar Sub-Division ORD/000434/2023-2024 3386/BWD 03/08/2023 60 RICK CONSTRUCTION 39.84 39.84 100 100
2007 PURBA BARDHAMAN Burdwan - II Burdwan Division Kusha Piped Water Supply Scheme , SM/13279 New Material Requisition To Resource Division RTOR000726/2023-2024 5270/BWD 30/11/2023 Resource Division 21.07 0.00 0 0
2008 PURBA BARDHAMAN Burdwan - II Central Mechanical Kusha Piped Water Supply Scheme , SM/13279 New Supply & delivery of standby Submersible pumping machinery & automatic Chlorinator for Kusha & others water supply scheme, under CMD, P.H.E. Dte., Dist.- Purba Bardhaman ASSISTANT ENGINEER Junior Engineer ORD/001412/2023-2024 150/CMSD 22/01/2024 15 SUBRATA BHADRA 1.76 0.00 0 100
2009 PURBA BARDHAMAN Burdwan - II Central Mechanical Kusha Piped Water Supply Scheme , SM/13279 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at Kusha Water Supply Scheme [Block- Burdwan-2] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER Junior Engineer ORD/000034/2023-2024 2470/CMD 30/05/2023 30 SUBRATA BHADRA 28.71 21.94 76.42 60
2010 PURBA BARDHAMAN Burdwan - II Central Mechanical Kusha Piped Water Supply Scheme , SM/13279 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at KUSHA & others water supply scheme under Bardhaman-II Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman ASSISTANT ENGINEER Junior Engineer ORD/000065/2024-2025 2389/CMD 02/08/2024 90 DILIP MAHATO 53.14 0.00 0 0
2011 PURBA BARDHAMAN Burdwan - II Burdwan Division Kusha Piped Water Supply Scheme , SM/13279 New KUSHA Piped Water Supply Scheme with sinking of Tube-well, LDS, Rising Main, FHTC, Construction of 150 cum capacity RCC OHR with 20.0 mtr. with Staging height including soil investigation & construction of switch-rooms & boundary walls at different TW site under Bardhaman-II Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. Junior Engineer, Burdwan Sadar Sub-Division ORD/000671/2022-2023 389/BWD. 31/01/2023 365 SYED KHORSED ALAM 250.51 155.03 61.89 75
2012 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Orgram Piped Water Supply Scheme at Bhatar Block , SM/07814 Retrofitting Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of ORGRAM Piped Water Supply Scheme & Sibda Colony habitation, Bhatar Block under Burdwan Division, PHE Dte.(Agreement No. 59/2020-2021 OF SE/CC/PHE. DTE.) Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000123/2020-2021 4886/BWD 07/12/2020 90 NANGTASWAR CO. OP. LABOUR CONT. AND CONSTRUCTION SOCIETY LTD. 97.01 28.41 29.29 1
2013 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Orgram Piped Water Supply Scheme at Bhatar Block , SM/07814 Retrofitting Construction of 300 cum capacity 20 Mtr. staging height RCC Over Head Reservoir including pipe connection and cost of pipes, specials for Orgram (Zone-I) & it's adjoining mouzas W/S. scheme under Burdwan Division, P.H.E. Dte.Ref. Drawing No.PC-I/OHR/7/2012 Dated 07.06.2012. Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000448/2021-2022 764/BWD 07/02/2022 180 S.N. ENTERPRISE 67.98 0.00 0 0
2014 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Orgram Piped Water Supply Scheme at Bhatar Block , SM/07814 Retrofitting Formal Work Order for Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of ORGRAM Piped Water Supply Scheme at Salkuni, Orgram (10 Nos Habitation), & Silakote Village (Mouza), Bhatar Block under Burdwan Division, PHE Dte._2ND CALL.(Agreement no. 102/SE/CC/PHE/Dte of 2020-2021) Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000424/2020-2021 1086/BWD 08/02/2021 90 SUPER CO. OPERATIVE LABOUR CONTRACT AND CONSTRUCTION SOCIETY LTD. 81.92 40.00 48.83 1
2015 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Orgram Piped Water Supply Scheme at Bhatar Block , SM/07814 Retrofitting Extension of distribution main for providing FHTC at Shikarpur village within Orgram W/S Scheme (Zone-II) in Bhatar Block under Burdwan Division, P.H.E. Dte. [Gr.-E] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000290/2021-2022 719/DSD 17/12/2021 30 DHIRENDRANATH SOM 3.28 3.28 100 1
2016 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Orgram Piped Water Supply Scheme at Bhatar Block , SM/07814 Retrofitting Extension of distribution main for providing FHTC at Shilakot village within Orgram W/S Scheme (Zone-II) in Bhatar Block under Burdwan Division, P.H.E. Dte.[Gr.-D] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000289/2021-2022 718/DSD 17/12/2021 30 DHIRENDRANATH SOM 3.15 3.10 98.41 1
2017 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Orgram Piped Water Supply Scheme at Bhatar Block , SM/07814 Retrofitting Extension of distribution main for providing FHTC at Shalkuni village within Orgram W/S Scheme (Zone-II) in Bhatar Block under Burdwan Division, P.H.E. Dte. [Gr.-C] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000288/2021-2022 717/DSD 17/12/2021 30 DHIRENDRANATH SOM 3.62 3.62 100 1
2018 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Orgram Piped Water Supply Scheme at Bhatar Block , SM/07814 Retrofitting Extension of pipeline at Bagmara village of Orgram (Z-II) and its adjoining mouzas piped water supply scheme at Bhatar Block within Burdwan Sadar Sub-Division, under Burdwan Division, PHE Dte.[Gr.-G] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000781/2021-2022 952/BSD 23/07/2021 30 M/S S. CHOUDHURY 2.01 0.00 0 1
2019 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Orgram Piped Water Supply Scheme at Bhatar Block , SM/07814 Retrofitting Shifting and relaying of Distribution system and Rising main at OHR site of Orgram Piped W/S Scheme (Zone-II) at Bhatar Block under Durgapur Sub-Division, Burdwan Division, P.H.E. Dte. Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer2, Durgapur Sub-Division, PHE Dte. ORD/000566/2023-2024 655/DSD 24/08/2023 30 INDIAN ENGINEERS CO.-OPERATIVE SOCIETY LTD. 0.75 0.00 0 0
2020 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Orgram Piped Water Supply Scheme at Bhatar Block , SM/07814 Retrofitting Vehicle bill (Car No.-WB-41H-3668) for the month of July to September'2023. BILL/01679/2023-2024 1142/JJM 29/12/2023 MD HASIN 0.86 0.00 0 0
2021 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Orgram Piped Water Supply Scheme at Bhatar Block , SM/07814 Retrofitting Restoration of damaged flanks due to laying of HDPE pipe line along the flank of Burdwan Katwa Road from 14.70 kmp to 16.20 kmp in the district of Purba Bardhaman under Bardhaman Division,P.W.D. BILL/00711/2024-2025 867/JJM 23/09/2024 EXECUTIVE ENGINEER PWD BURDWAN DIVISION 7.90 0.00 0 null
2022 PURBA BARDHAMAN Purbasthali - I Burdwan Division ARJUNPUKUR PIPED WATER SUPPLY SCHEME , SM/13413 New Material Requisition To Resource Division RTOR000177/2023-2024 2155/BWD 10/05/2023 Resource Division 17.10 0.00 0 0
2023 PURBA BARDHAMAN Purbasthali - I Central Mechanical ARJUNPUKUR PIPED WATER SUPPLY SCHEME , SM/13413 New New service connection charges for Arjunpukur PWSS Tw-2 BILL/00699/2023-2024 BP-2023-24-51 13/07/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.05 0.00 0 0
2024 PURBA BARDHAMAN Purbasthali - I Central Mechanical ARJUNPUKUR PIPED WATER SUPPLY SCHEME , SM/13413 New New service connection charges for Arjunpukur PWSS Tw-1 BILL/00698/2023-2024 BP-2023-24-50 13/07/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.35 0.00 0 0
2025 PURBA BARDHAMAN Purbasthali - I Burdwan Division ARJUNPUKUR PIPED WATER SUPPLY SCHEME , SM/13413 New Material Requisition To Resource Division RTOR000476/2023-2024 4000/BWD 08/09/2023 Resource Division 1.54 0.00 0 0
2026 PURBA BARDHAMAN Purbasthali - I Burdwan Division ARJUNPUKUR PIPED WATER SUPPLY SCHEME , SM/13413 New Material Requisition To Resource Division RTOR000795/2023-2024 314/BWD 24/01/2024 Resource Division 14.63 0.00 0 0
2027 PURBA BARDHAMAN Purbasthali - I Central Mechanical ARJUNPUKUR PIPED WATER SUPPLY SCHEME , SM/13413 New Supply & Installation of Submersible Pumping Machinery , Voltage Stabilizer, Chlorination System and Internal House wiring for Tube well no.- 1 & 2 at ARJUNPUKUR Water Supply Scheme [Block-PURBASTHALI-1] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000125/2023-2024 2638/CMD 14/06/2023 444 ANJAN ENTERPRISE 21.51 0.00 0 90
2028 PURBA BARDHAMAN Purbasthali - I Burdwan Division ARJUNPUKUR PIPED WATER SUPPLY SCHEME , SM/13413 New Laying of additional pipeline and providing FHTC at ARJUNPUKUR Water Supply Scheme under Kalna Sub-Division, Burdwan Division, PHE Dte. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000175/2024-2025 2252/BWD 18/06/2024 90 IYASIN DAFADAR 16.60 0.00 0 2
2029 PURBA BARDHAMAN Purbasthali - I Burdwan Division ARJUNPUKUR PIPED WATER SUPPLY SCHEME , SM/13413 New ARJUNPUKUR Piped Water Supply Scheme with sinking of Tube-well, LDS,Rising Main, FHTC, Construction of 200 cum capacity RCC OHR with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drain and internal pathway at different TW site under Purbasthali-I Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000003/2023-2024 1617/BWD 05/04/2023 365 AZAD ENTERPRISE 397.64 180.19 45.31 85
2030 PURBA BARDHAMAN Purbasthali - I Central Mechanical ARJUNPUKUR PIPED WATER SUPPLY SCHEME , SM/13413 New Supply and installation of Electro-Magnetic flow meter at Bazar Mahammadpur, Dhatrigram, Arjunpukur & others water supply scheme under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000590/2024-2025 3105/CMD 11/12/2024 60 SHREE BISHNU CONSTRUCTION 19.77 0.00 0 0
2031 PURBA BARDHAMAN Purbasthali - I Central Mechanical ARJUNPUKUR PIPED WATER SUPPLY SCHEME , SM/13413 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Manganpur & others water supply scheme under Purbasthali 1 Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000714/2024-2025 2979/CMD 25/11/2024 90 H.K. DAS & CO. 53.27 0.00 0 0
2032 PURBA BARDHAMAN Purbasthali - I Burdwan Division ARJUNPUKUR PIPED WATER SUPPLY SCHEME , SM/13413 New Pipeline laying by HDD method and different types of balance works in connection with different Augmentation & New Scheme [(SM/ 08103), (SM/13413), (SM/15587), (SM/16035), (SM/16287), (SM/16029), (SM/15581), (SM/14437), (SM/16028), (SM/16036) & (SM/14425)] within Kalna Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer ORD/001270/2024-2025 849/BWD 05/03/2025 180 S.P. CONSTRUCTION 683.30 0.00 0 0
2033 PURBA BARDHAMAN Purbasthali - I Burdwan Division ARJUNPUKUR PIPED WATER SUPPLY SCHEME , SM/13413 New Work Order for " Laying distribution system including restorationof FHTC under the command area of Arjunpukur Piped water supply scheme (SM/13413) under Kalna Sub-Division under Burdwan Division, PHE Dte." Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000856/2024-2025 1842/KSD 27/11/2024 20 IYASIN DAFADAR 2.82 0.00 0 100
2034 PURBA BARDHAMAN Ausgram - II Burdwan Division SAR PIPED WATER SUPPLY SCHEME , SM/14929 New Material Requisition To Resource Division RTOR000055/2023-2024 1962/BWD 25/04/2023 Resource Division 11.55 0.00 0 0
2035 PURBA BARDHAMAN Ausgram - II Burdwan Division SAR PIPED WATER SUPPLY SCHEME , SM/14929 New Material Requisition To Resource Division RTOR000294/2023-2024 2197/BWD 12/05/2023 Resource Division 12.41 0.00 0 0
2036 PURBA BARDHAMAN Ausgram - II Central Mechanical SAR PIPED WATER SUPPLY SCHEME , SM/14929 New New service connection charges for Sar PWSS TW-1 BILL/01464/2023-2024 BP-2023-24-163 18/09/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 6.80 0.00 0 0
2037 PURBA BARDHAMAN Ausgram - II Central Mechanical SAR PIPED WATER SUPPLY SCHEME , SM/14929 New New service connection charges for Sar PWSS TW-2 BILL/01463/2023-2024 BP-2023-24-162 18/09/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.45 0.00 0 0
2038 PURBA BARDHAMAN Ausgram - II Burdwan Division SAR PIPED WATER SUPPLY SCHEME , SM/14929 New Material Requisition To Resource Division RTOR000758/2023-2024 5241/BWD 30/11/2023 Resource Division 18.50 0.00 0 0
2039 PURBA BARDHAMAN Ausgram - II Central Mechanical SAR PIPED WATER SUPPLY SCHEME , SM/14929 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at Sar Water Supply Scheme [ Block-Ausgram-2 ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. Driller In-Charge JUNIOR ENGINEER ORD/000588/2023-2024 3924/CMD 22/08/2023 30 D.K. ELECTRIC 27.75 10.79 38.88 98
2040 PURBA BARDHAMAN Ausgram - II Burdwan Division SAR PIPED WATER SUPPLY SCHEME , SM/14929 New SAR Piped Water Supply Scheme with sinking of Tube-well, LDS, Rising Main, FHTC & construction of switch rooms & boundary walls with gates and land development, drain and internal pathway at different TW site under Aushgram-II Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer ORD/000094/2023-2024 2231/BWD 16/05/2023 365 KHEPIMA ENGINEERS CO. OPERATIVE SOCIETY LTD. 193.73 101.81 52.55 100
2041 PURBA BARDHAMAN Ausgram - II Central Mechanical SAR PIPED WATER SUPPLY SCHEME , SM/14929 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Chora, Kalaijhuti & others water supply scheme under Ausgram-2 Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. Driller In-Charge JUNIOR ENGINEER ORD/000143/2024-2025 2405/CMD 02/08/2024 90 NABAUDYOG ELECTRICAL ENGINEERING CO-OPERATIVE SOCIETY LTD 95.26 0.00 0 0
2042 PURBA BARDHAMAN Ausgram - II Durgapur W/S Division SAR PIPED WATER SUPPLY SCHEME , SM/14929 New Acceptance cum Formal Work Order for Road Restoration ,Land development with access road & allied works for Augmentation of SAR PWSS , Ausgram-II Block under Durgapur Water Supply Division, PHE Dte. Assistant Engineer-II Contractual Junior Engineer_5 ORD/000175/2024-2025 1616/DWSD 26/11/2024 90 SAIKAT RAY 10.77 0.00 0 0
2043 PURBA BARDHAMAN Ausgram - II Durgapur W/S Division SAR PIPED WATER SUPPLY SCHEME , SM/14929 New Acceptance cum Formal Work Order for SATINANDI Piped Water Supply Scheme with INSTALLATION OF BARBED WIRE, FHTC ,Road restoration ,DEMOLITION WORK & land development with road at TW site under Galsi-II Block, District:- Purba-Bardhaman under Durgapur W/S Division, PHE Dte. Assistant Engineer-II Contractual Junior Engineer_4 ORD/000183/2024-2025 1620/DWSD 26/11/2024 90 A K SIKDAR 79.05 0.00 0 35
2044 PURBA BARDHAMAN Ausgram - II Durgapur W/S Division SAR PIPED WATER SUPPLY SCHEME , SM/14929 New Material Requisition To Resource Division RTOR000015/2024-2025 1724/K/DWSD 10/12/2024 Resource Division 0.55 0.00 0 0
2045 PURBA BARDHAMAN Ausgram - II Durgapur W/S Division SAR PIPED WATER SUPPLY SCHEME , SM/14929 New Acceptance cum Formal Work for Additional work for SAR (SAR Canalpar, Adibasipara) Piped Water Supply Scheme with LDS & FHTC under ausgram-II Block, Dist- Purba Bardhaman (New Scheme) under Durgapur W/S Division, PHE Dte. Assistant Engineer-II Contractual Junior Engineer_5 ORD/000147/2024-2025 1384/DWSD 26/09/2024 45 KHEPIMA ENGINEERS CO. OPERATIVE SOCIETY LTD. 16.59 0.00 0 100
2046 PURBA BARDHAMAN Ausgram - II Durgapur W/S Division SAR PIPED WATER SUPPLY SCHEME , SM/14929 New Material Requisition To Resource Division RTOR000053/2024-2025 473/DWSD 17/03/2025 Resource Division 0.14 0.00 0 0
2047 PURBA BARDHAMAN Memari - II Burdwan Division MOSHRA PIPED WATER SUPPLY SCHEME , SM/14931 New Material Requisition To Resource Division RTOR000345/2023-2024 2197/BWD 12/05/2023 Resource Division 9.91 0.00 0 0
2048 PURBA BARDHAMAN Memari - II Burdwan Division MOSHRA PIPED WATER SUPPLY SCHEME , SM/14931 New Material Requisition To Resource Division RTOR000469/2023-2024 3993/BWD 08/09/2023 Resource Division 7.17 0.00 0 0
2049 PURBA BARDHAMAN Memari - II Burdwan Division MOSHRA PIPED WATER SUPPLY SCHEME , SM/14931 New Material Requisition To Resource Division RTOR000678/2023-2024 5053/BWD 23/11/2023 Resource Division 20.46 0.00 0 0
2050 PURBA BARDHAMAN Memari - II Central Mechanical MOSHRA PIPED WATER SUPPLY SCHEME , SM/14931 New Electric quotation for New Service Connection at Moshra W/S Scehem PH-I. BILL/01782/2023-2024 BP-2023-24-289 26/12/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 5.54 0.00 0 0
2051 PURBA BARDHAMAN Memari - II Burdwan Division MOSHRA PIPED WATER SUPPLY SCHEME , SM/14931 New Continuation Work Order supply of inspection Vehicle for inspection of different JJM related(schemes)works as and when required including supply of driver & fuel(minimum 8 hours duty per day) and all taxes etc. for Burdwan Sub-Division under Burdwan Division,PHE Dte consider 96.00 Km. run per day (Period from 01-11-2023 to 31-01-2024) ORD/000985/2023-2024 2561/BSD 30/10/2023 66 MD HASIN 0.85 0.00 0 0
2052 PURBA BARDHAMAN Memari - II Central Mechanical MOSHRA PIPED WATER SUPPLY SCHEME , SM/14931 New Quotation for new service connection for Mashra PWSS TW-2 BILL/00297/2024-2025 BP-2024-25-147 19/06/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 4.84 0.00 0 0
2053 PURBA BARDHAMAN Memari - II Central Mechanical MOSHRA PIPED WATER SUPPLY SCHEME , SM/14931 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at NOAHATI & others water supply scheme under Memari-II Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. ASSISTANT ENGINEER Junior Engineer ORD/000102/2024-2025 2395/CMD 02/08/2024 90 S.G. TECHNICAL SERVICES 36.99 0.00 0 0
2054 PURBA BARDHAMAN Memari - II Burdwan Division MOSHRA PIPED WATER SUPPLY SCHEME , SM/14931 New MOSHRA Piped Water Supply Scheme with sinking of Tube-well, LDS, Rising Main, FHTC, Construction of 150 cum capacity RCC OHR with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drain and internal pathway at different TW site under Memari-II Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000387/2023-2024 3196/BWD 24/07/2023 768 M/S LOKE NIRMAN 285.22 4.61 1.62 60
2055 PURBA BARDHAMAN Memari - II Central Mechanical MOSHRA PIPED WATER SUPPLY SCHEME , SM/14931 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at Moshra Water Supply Scheme [ Block- Memari-2 ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER Junior Engineer ORD/000714/2023-2024 4025/CMD 29/08/2023 642 MAA KALI ENTERPRISE 29.37 0.00 0 90
2056 PURBA BARDHAMAN Ausgram - I,Ausgram - II Burdwan Division BHEDIA PIPED WATER SUPPLY SCHEME , SM/14748 New Material Requisition To Resource Division RTOR000047/2023-2024 1962/BWD 25/04/2023 Resource Division 3.03 0.00 0 0
2057 PURBA BARDHAMAN Ausgram - I,Ausgram - II Burdwan Division BHEDIA PIPED WATER SUPPLY SCHEME , SM/14748 New Material Requisition To Resource Division RTOR000254/2023-2024 2197/BWD 12/05/2023 Resource Division 14.27 0.00 0 0
2058 PURBA BARDHAMAN Ausgram - I,Ausgram - II Burdwan Division BHEDIA PIPED WATER SUPPLY SCHEME , SM/14748 New Material Requisition To Resource Division RTOR000603/2023-2024 4909/BWD 10/11/2023 Resource Division 33.07 0.00 0 0
2059 PURBA BARDHAMAN Ausgram - I,Ausgram - II Central Mechanical BHEDIA PIPED WATER SUPPLY SCHEME , SM/14748 New NEW SERVICE CONNECTION FOR BHEDIA PWSS PH-1. BILL/03139/2023-2024 BP-2023-24-649 20/03/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.26 0.00 0 0
2060 PURBA BARDHAMAN Ausgram - I,Ausgram - II Central Mechanical BHEDIA PIPED WATER SUPPLY SCHEME , SM/14748 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Chora, Kalaijhuti & others water supply scheme under Ausgram-2 Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. Driller In-Charge JUNIOR ENGINEER ORD/000143/2024-2025 2405/CMD 02/08/2024 90 NABAUDYOG ELECTRICAL ENGINEERING CO-OPERATIVE SOCIETY LTD 95.26 0.00 0 0
2061 PURBA BARDHAMAN Ausgram - I,Ausgram - II Central Mechanical BHEDIA PIPED WATER SUPPLY SCHEME , SM/14748 New New service connection charges for Bhedia PWSS TW-2 BILL/00822/2024-2025 BP-2024-25-319 30/09/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 6.48 0.00 0 0
2062 PURBA BARDHAMAN Ausgram - I,Ausgram - II Durgapur W/S Division BHEDIA PIPED WATER SUPPLY SCHEME , SM/14748 New Acceptance cum Formal Work Order for Sinking of 300X200 mm dia TW,Pump House,Boundary wall concrete road & bituminous road restoration ,Jack pushing with laying of MS Pipe FHTC and land development of H/W Site drain & Internal pathway laying of MS pipe under Bhedia PWSS (JJM),Block-Aushgram-II,Dist-Purba Bardhaman under Durgapur W/S Division,PHE Dte. Assistant Engineer-II JUNIOR ENGINEER-2 ORD/000170/2024-2025 1611/DWSD 26/11/2024 90 SUPRIYA RAY 87.54 0.00 0 0
2063 PURBA BARDHAMAN Ausgram - I,Ausgram - II Durgapur W/S Division BHEDIA PIPED WATER SUPPLY SCHEME , SM/14748 New Formal Work Order for Additional work for laying 200 mm dia HDPE pipe line and other necessary allied works Amarpur & Bhedia Piped W/S Scheme, Block- Aushgram-2, Dist- Purba Bardhaman under Durgapur W/S Division, PHE Dte. Assistant Engineer-II JUNIOR ENGINEER-1,JUNIOR ENGINEER-2 ORD/000141/2024-2025 1291/DWSD 06/09/2024 210 SAIKAT RAY 196.61 0.00 0 60
2064 PURBA BARDHAMAN Ausgram - I,Ausgram - II Burdwan Division BHEDIA PIPED WATER SUPPLY SCHEME , SM/14748 New Sinking of Tube-wells, LDS, Rising Main, FHTC, Construction of 300 cum capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation, construction of switch rooms, boundary walls with gates, land development, internal drains and internal pathways for BHEDIA Piped Water Supply Scheme under Ausgram-II Block, District:- Purba-Bardhaman [NEW SCHEME] ORD/000807/2023-2024 4847/BWD 09/11/2023 730 SUPRIYA RAY 397.54 0.00 0 50
2065 PURBA BARDHAMAN Ausgram - I,Ausgram - II Central Mechanical BHEDIA PIPED WATER SUPPLY SCHEME , SM/14748 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at BHEDIA Water Supply Scheme [ Block- AUSGRAM-2] under CMD, PHE Dte., Dist.- Purba-Bardhaman. Driller In-Charge JUNIOR ENGINEER ORD/000826/2023-2024 4103/CMD 29/08/2023 611 WEST BENGAL ENGINEERING CO. 27.76 0.00 0 80
2066 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF KASHIARA PIPED WATER SUPPLY SCHEME , SM/15562 Augmentation Detail route survey, design of distribution network and preparation of estimate, drawing & DPR for providing FHTC in the scheme KASHIARA PWSS (Sl No-5) Assistant Engineer JUNIOR ENGINEER KATWA SUB-DIVISION PHE DTE ORD/000073/2023-2024 397/KTS 13/04/2023 30 SIRCON ENGINEERING SERVICES 2.62 2.62 100 100
2067 PURBA BARDHAMAN Central Mechanical AUGMENTATION OF KASHIARA PIPED WATER SUPPLY SCHEME , SM/15562 Augmentation Yard lighting arrangement & allied works at Kasiara water supply scheme under Mangalkote Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. Driller In-Charge Junior Engineer ORD/000409/2024-2025 2789/CMD 01/10/2024 60 BABA MALLESHWAR ENTERPRISE. 5.55 0.00 0 0
2068 PURBA BARDHAMAN Central Mechanical AUGMENTATION OF KASHIARA PIPED WATER SUPPLY SCHEME , SM/15562 Augmentation Quotation for new service connection at Augmentation of Kashiara PWSS TW-1 BILL/01088/2024-2025 BP-2024-25-398 22/11/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.75 0.00 0 0
2069 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF KASHIARA PIPED WATER SUPPLY SCHEME , SM/15562 Augmentation Augmentation of KASHIARA Piped Water Supply Scheme with sinking of Tube-well, LDS, Rising Main, FHTC, Construction of 450 cum capacity RCC OHR with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drain and internal pathway at different TW site under MONGALKOTE Block, District:- Purba-Bardhaman. Assistant Engineer JUNIOR ENGINEER R.W.S. BURDWAN SUB-DIVISION PHE DTE ORD/000753/2023-2024 4666/BWD 01/11/2023 427 M/S B. RAI CONSTRUCTION COMPANY 372.35 0.00 0 30
2070 PURBA BARDHAMAN Central Mechanical AUGMENTATION OF KASHIARA PIPED WATER SUPPLY SCHEME , SM/15562 Augmentation Supply & Installation of Submersible Pumping Machinery , Voltage Stabilizer, Chlorination system and internal House wiring for Tube well no.- 1 at Augumentation of Kashiara Water Supply Scheme under CMD, PHE Dte., Dist.- Purba-Bardhaman. Driller In-Charge Junior Engineer ORD/000080/2023-2024 2580/CMD 07/06/2023 710 GLACIER ENGINEERING CO 11.03 0.00 0 92
2071 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF KASHIARA PIPED WATER SUPPLY SCHEME , SM/15562 Augmentation Road crossing through bituminus PWD road by Jack Pushing method of different location under the command area of KASHIARA (SM/12080, SM/15562) & SIMULIA (SM/18459) PWSS under Mongalkote Block under Katwa Sub Division under Burdwan Division, PHE. Dte. Assistant Engineer ORD/001309/2024-2025 976/BWD 13/03/2025 45 MANASH GHOSH 48.92 0.00 0 0
2072 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Ruppur Piped Water Supply Scheme at Jamalpur Block , SM/07778 Retrofitting Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of Ruppur Piped Water Supply Scheme at Ruppur Village (6 Nos. habitations), Biswambharpur Village & Dhuluk Village (6 Nos. habitations) Jamalpur Block under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. Junior Engineer, R.W.S. Burdwan Sub Division, P.H.E. Dt ORD/000041/2021-2022 3446/BWD 29/06/2021 60 NATIONAL CONSTRUCTION 87.06 28.29 32.49 1
2073 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Ruppur Piped Water Supply Scheme at Jamalpur Block , SM/07778 Retrofitting Extensionof pipe linefor providing functional house hold tap connection at Ruppur village(Habitation)of RUPPUR Piped Water Supply Scheme Piped Water Supply Scheme within Burdwan Sub-Division under Burdwan Division,PHE Dte".Gr.B. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. Junior Engineer, R.W.S. Burdwan Sub Division, P.H.E. Dt ORD/000474/2021-2022 275/BSD 15/02/2022 30 SAMANTA CONSTRUCTION 4.82 4.74 98.34 1
2074 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED SHYAMSUNDAR (PART B) PWSS , SM/15183 Augmentation Construction of Pump House cum chlorine room without sanitary and water supply arrangement at Tube Well Site to departmental drawing no-PHE/BD/P.H/DRG/02/DEC-17(Size 3.60 mtr x 3.00 mtr room) for SHYAMSUNDAR its Adjoining Mouza W/S Scheme, Block -Raina-I within Burdwan Sub-Division, PHE Dte. (Mouza- Gopinathpur) Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000770/2022-2023 505/BSD 21/03/2023 45 JYOTI ENTERPRISE 3.50 2.76 78.86 100
2075 PURBA BARDHAMAN Central Mechanical AUGMENTATION OF GROUND WATER BASED SHYAMSUNDAR (PART B) PWSS , SM/15183 Augmentation New service connection charges for Aug. of Shyamsundar PWSS TW-1 BILL/00855/2023-2024 BP-2023-24-104 07/08/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 7.18 0.00 0 0
2076 PURBA BARDHAMAN Central Mechanical AUGMENTATION OF GROUND WATER BASED SHYAMSUNDAR (PART B) PWSS , SM/15183 Augmentation New service connection charges for Aug. Shyamsundar PWSS TW-4 BILL/01425/2023-2024 BP-2023-24-150 05/09/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 4.25 0.00 0 0
2077 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED SHYAMSUNDAR (PART B) PWSS , SM/15183 Augmentation Construction of Drain at Head Work site for SHYAMSUNDAR PIPED WATER SUPPLY SCHEME , Block- Raina-I , within Burdwan Sub Division under Burdwan Division PHE Dte JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000148/2024-2025 1041/BSD 10/06/2024 30 LAKSHMIKANTA DAS 0.93 0.00 0 0
2078 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED SHYAMSUNDAR (PART B) PWSS , SM/15183 Augmentation Construction of Pathway at Head Work site for SHYAMSUNDAR PIPED WATER SUPPLY SCHEME , Block- Raina-I , within Burdwan Sub Division under Burdwan Division PHE Dte. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000154/2024-2025 1040/BSD 10/06/2024 30 POMPA CONSTRUCTION CO. 0.93 0.00 0 0
2079 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED SHYAMSUNDAR (PART B) PWSS , SM/15183 Augmentation Land development at Head Work site for SHYAMSUNDAR PIPED WATER SUPPLY SCHEME , Block- Raina-I , within Burdwan Sub Division under Burdwan Division PHE Dte. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000167/2024-2025 1039/BSD 10/06/2024 30 MAA MAHAMAYA CONSTRUCTION 0.88 0.00 0 0
2080 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED SHYAMSUNDAR (PART B) PWSS , SM/15183 Augmentation Augmentation of SHYAMSUNDAR Piped Water Supply Scheme with LDS, Rising Main, Construction of 350 Cum capacity OHR with 20.0 Mtr. Staging height inclusive of soil test, Construction of boundary wall at Head works & 2nd TW site & FHTC under Raina ¿ I Block, District - Purba Bardhaman. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000598/2021-2022 1474/BWD 14/03/2022 360 SK ALIM 474.78 43.66 9.2 100
2081 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED SHYAMSUNDAR (PART B) PWSS , SM/15183 Augmentation Laying Parallel Pipeline, providing FHTC and Repairing of Pump House at 2nd Tube Well Site for Aug. of SHYAMSUNDAR Piped Water Supply Scheme, Block- Raina-I, within Burdwan Sub Division under Burdwan Division PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000224/2024-2025 2524/BWD 03/07/2024 90 DEBASHISH ENTERPRISE 22.66 0.00 0 0
2082 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED SHYAMSUNDAR (PART B) PWSS , SM/15183 Augmentation Allied works for Augmentation of SHYAMSUNDAR W/S Scheme under Burdwan Division, PHE. Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. Junior Engineer1, Durgapur Sub-Division, PHE Dte. ORD/000346/2023-2024 3035/BWD 14/07/2023 90 SK ALIM 113.11 0.00 0 100
2083 PURBA BARDHAMAN Central Mechanical AUGMENTATION OF GROUND WATER BASED SHYAMSUNDAR (PART B) PWSS , SM/15183 Augmentation Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination system and internal House wiring for Tube well no.- 1 & 2 at Augmentation of SHYAMSUNDAR(Part-B)[RAINA-I] Water Supply Scheme under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000569/2023-2024 3901/CMD 18/08/2023 286 SOUNAK ENTERPRISE 24.41 12.44 50.96 90
2084 PURBA BARDHAMAN Central Mechanical AUGMENTATION OF GROUND WATER BASED SHYAMSUNDAR (PART B) PWSS , SM/15183 Augmentation Making illumination arrangement and mise works at SHYAMSUNDAR water supply scheme RAINA-I BLOCK under Central Mechanical Division P.H.E. Dte. Purba-Bardhaman. ASSISTANT ENGINEER Junior Engineer ORD/000474/2024-2025 2954/CMD 20/11/2024 60 CHATTERJEE ENTERPRISE 14.87 0.00 0 30
2085 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED SHYAMSUNDAR (PART B) PWSS , SM/15183 Augmentation Re- Connection of existing FHTC [54Nos.] damaged by construction of PATHASHREE ROAD for SHYAMSUNDA RPIPED WATER SUPPLY SCHEME,Block-Raina-I,within Burdwan Sub Division under Burdwan Division PHE Dte. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000515/2024-2025 1862/BSD 22/08/2024 30 MAA MAHAMAYA CONSTRUCTION 0.95 0.00 0 100
2086 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED SHYAMSUNDAR (PART B) PWSS , SM/15183 Augmentation Restore of pipeline damaged by construction of pathashree road near Surya Pally for SHYAMSUNDAR Piped Water Supply Scheme,Block:Raina-I within Burdwan Sub Division under Burdwan Division PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/001020/2024-2025 10/BSD 02/01/2025 15 MAA MAHAMAYA CONSTRUCTION 0.97 0.00 0 100
2087 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED SHYAMSUNDAR (PART B) PWSS , SM/15183 Augmentation Laying Parallel Pipeline along Pathashree Road from Girls School to Muktipur Village for SHYAMSUNDAR PIPED WATER SUPPLY SCHEME, Block- Raina-I , within Burdwan Sub Division under Burdwan Division PHE Dte. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/001198/2024-2025 102/BSD 16/01/2025 30 MAA MAHAMAYA CONSTRUCTION 4.08 0.00 0 100
2088 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED SHYAMSUNDAR (PART B) PWSS , SM/15183 Augmentation Restore of pipeline damaged by construction of Pathashree Road near Muktipur Village for SHYAMSUNDAR PIPED WATER SUPPLY SCHEME , Block- Raina-I , within Burdwan Sub Division under Burdwan Division PHE Dte. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000518/2024-2025 1865/BSD 22/08/2024 30 MAA MAHAMAYA CONSTRUCTION 0.97 0.00 0 100
2089 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED SHYAMSUNDAR (PART B) PWSS , SM/15183 Augmentation Restore of pipeline damaged by construction of pathashree road near Shyamsundar Grils School for SHYAMSUNDAR Piped Water Supply Scheme,Block:Raina-I within Burdwan Sub Division under Burdwan Division PHE Dte JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/001284/2024-2025 506/BSD 06/03/2025 30 MAA MAHAMAYA CONSTRUCTION 0.95 0.00 0 100
2090 PURBA BARDHAMAN Central Mechanical AUGMENTATION OF KALYANPUR PIPED WATER SUPPLY SCHEME , SM/16299 Augmentation NEW SERVICE CONNECTION FOR AUGMENTATION FOR KALYANPUR PWSS PH-2 BILL/00186/2024-2025 BP-2024-25-87 15/05/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 5.96 0.00 0 0
2091 PURBA BARDHAMAN Central Mechanical AUGMENTATION OF KALYANPUR PIPED WATER SUPPLY SCHEME , SM/16299 Augmentation Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination system and internal House wiring for Tube well no.- 1 & 2 at Augmentation of KALYANPUR[KALNA-II] Water Supply Scheme under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/001079/2023-2024 4438/CMD 01/11/2023 760 SOUNAK ENTERPRISE 24.41 0.00 0 50
2092 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF KALYANPUR PIPED WATER SUPPLY SCHEME , SM/16299 Augmentation Providing FHTC work at Kalyanpur village under KALYANPUR Water Supply Scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer JUNIOR ENGINEER RWS KALNA2 ORD/000885/2023-2024 5514/BWD 14/12/2023 151 SETH ENTERPRISE 13.89 0.00 0 100
2093 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF KALYANPUR PIPED WATER SUPPLY SCHEME , SM/16299 Augmentation Different types of works involve in connection with Augmentation of KALYANPUR (SM/16299) Water Supply Scheme & BHABANANDAPUR (SM/16024) Water Supply Scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer JUNIOR ENGINEER RWS KALNA2 ORD/000189/2024-2025 2433/BWD 27/06/2024 247 BALAJEE ENTERPRISES 225.16 44.30 19.67 2
2094 PURBA BARDHAMAN Central Mechanical AUGMENTATION OF PURBASAHAPUR PIPED WATER SUPPLY SCHEME , SM/16193 Augmentation Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination system and internal House wiring for Tube well no.- 1 & 2 at Augmentation of PURBA SAHAPUR[KALNA-II] Water Supply Scheme under CMD, PHE Dte., Dist.- Purba-Bardhaman. ORD/001085/2023-2024 4477/CMD 05/10/2023 30 DUTTA ENTERPRISE 24.40 0.00 0 0
2095 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF PURBASAHAPUR PIPED WATER SUPPLY SCHEME , SM/16193 Augmentation Augmentation of PURBA SAHAPUR PWSS to accommodate FHTC, Laying Distribution System, Laying Rising Main, under Jal Jeevan Mission of Kalna - II Block, Purba Burdwan District under Burdwan Division, PHE. Dte. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000416/2023-2024 3273/BWD 28/07/2023 60 PARTHA PRATIM ACHARYA 21.94 0.00 0 80
2096 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF PURBASAHAPUR PIPED WATER SUPPLY SCHEME , SM/16193 Augmentation Providing leftout FHTC at different location of Purba Sahapur Mouza under the command area of PURBA SAHAPUR PWSS (SM/16193) in order to declare Purba Sahapur village as Sajalgram under Kalna Sub Division, PHE. Dte. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/001297/2024-2025 912/BWD 10/03/2025 15 SAYAK DEY 5.79 0.00 0 0
2097 PURBA BARDHAMAN Burdwan - I Burdwan Division NERAGOHALIA PIPED WATER SUPPLY SCHEME , SM/16617 New Material Requisition To Resource Division RTOR000103/2023-2024 1962/BWD 25/04/2023 Resource Division 18.38 0.00 0 0
2098 PURBA BARDHAMAN Burdwan - I Burdwan Division NERAGOHALIA PIPED WATER SUPPLY SCHEME , SM/16617 New Material Requisition To Resource Division RTOR000354/2023-2024 2197/BWD 12/05/2023 Resource Division 20.45 0.00 0 0
2099 PURBA BARDHAMAN Burdwan - I Central Mechanical NERAGOHALIA PIPED WATER SUPPLY SCHEME , SM/16617 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at Neragohalia Water Supply Scheme [ Block- Burdwan-1 ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER Junior Engineer ORD/000660/2023-2024 4003/CMD 29/08/2023 30 DUTTA ENTERPRISE 28.98 0.00 0 0
2100 PURBA BARDHAMAN Burdwan - I Burdwan Division NERAGOHALIA PIPED WATER SUPPLY SCHEME , SM/16617 New Material Requisition To Resource Division RTOR000727/2023-2024 5273/BWD 30/11/2023 Resource Division 21.07 0.00 0 0
2101 PURBA BARDHAMAN Burdwan - I Central Mechanical NERAGOHALIA PIPED WATER SUPPLY SCHEME , SM/16617 New Quotation for new service connection at NARAGOHALIA W/S Scheme PH-I. BILL/01814/2023-2024 BP-2023-24-321 30/12/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 4.28 0.00 0 0
2102 PURBA BARDHAMAN Burdwan - I Central Mechanical NERAGOHALIA PIPED WATER SUPPLY SCHEME , SM/16617 New New service connection charges for Neragohalia PWSS TW-2 BILL/02205/2023-2024 BP-2023-24-391 17/01/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 7.09 0.00 0 0
2103 PURBA BARDHAMAN Burdwan - I Burdwan Division NERAGOHALIA PIPED WATER SUPPLY SCHEME , SM/16617 New Sinking of Tube-wells, LDS, Rising Main, FHTC, Construction of 350 cum capacity RCC OHR with 20.0 mtr. with Staging height including soil investigation, construction of switch room, boundary walls with gates, land development, surface drains and internal pathways at different TW site for NERAGOHALIA Piped Water Supply Scheme under BURDWAN-I Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000478/2023-2024 3493/BWD 09/08/2023 365 M/S ASHA CONSTRUCTION 577.52 103.74 17.96 35
2104 PURBA BARDHAMAN Burdwan - I Central Mechanical NERAGOHALIA PIPED WATER SUPPLY SCHEME , SM/16617 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at MALKITA & others water supply scheme under Bardhaman-I Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman ASSISTANT ENGINEER Junior Engineer ORD/000066/2024-2025 2388/CMD 02/08/2024 90 ELECTRICAL & MECHANICAL ENGINEERING CORPORATION 55.95 0.00 0 0
2105 PURBA BARDHAMAN Burdwan - I Burdwan Division NERAGOHALIA PIPED WATER SUPPLY SCHEME , SM/16617 New Restoration of Conc. road, Providing leftout FHTC with extension of Pipeline, construction of Pathway, drain, repairing of Pump House at Head Work site with allied works for MAGRA, SANUI, SATGACHIA Zone-I & NARAGOHALIA PIPED WATER SUPPLY SCHEME, Block-Memari-I, within Burdwan Sub Division under Burdwan Division PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/001192/2024-2025 611/BWD 11/02/2025 180 M/S ASHA CONSTRUCTION 354.13 0.00 0 0
2106 PURBA BARDHAMAN Raina - I Burdwan Division BAJITPUR PIPED WATER SUPPLY SCHEME , SM/16619 New Material Requisition To Resource Division RTOR000220/2023-2024 2155/BWD 10/05/2023 Resource Division 11.46 0.00 0 0
2107 PURBA BARDHAMAN Raina - I Burdwan Division BAJITPUR PIPED WATER SUPPLY SCHEME , SM/16619 New Material Requisition To Resource Division RTOR000479/2023-2024 4003/BWD 08/09/2023 Resource Division 9.08 0.00 0 0
2108 PURBA BARDHAMAN Raina - I Central Mechanical BAJITPUR PIPED WATER SUPPLY SCHEME , SM/16619 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at Bajitpur Water Supply Scheme [ Block- Raina-1 ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000717/2023-2024 4028/CMD 29/08/2023 30 SAIKAT ENTERPRISE 28.98 0.00 0 0
2109 PURBA BARDHAMAN Raina - I Burdwan Division BAJITPUR PIPED WATER SUPPLY SCHEME , SM/16619 New Material Requisition To Resource Division RTOR000647/2023-2024 5096/BWD 23/11/2023 Resource Division 20.46 0.00 0 0
2110 PURBA BARDHAMAN Raina - I Central Mechanical BAJITPUR PIPED WATER SUPPLY SCHEME , SM/16619 New New electric connection for Bajitpur PWSS, PH-1. BILL/01887/2023-2024 BP-2023-24-358 11/01/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 5.31 0.00 0 0
2111 PURBA BARDHAMAN Raina - I Burdwan Division BAJITPUR PIPED WATER SUPPLY SCHEME , SM/16619 New Different works related (sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of different capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site) to BAJITPUR, SHUKUR & HARISHNAPUR Piped Water Supply Scheme under RAINA-I Block, District:- Purba Bardhaman [NEW SCHEME] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000388/2023-2024 3197/BWD 24/07/2023 365 MRITYUNJOY MUKHERJEE & CO. 1,242.03 0.00 0 30
2112 PURBA BARDHAMAN Raina - I Burdwan Division BAJITPUR PIPED WATER SUPPLY SCHEME , SM/16619 New Continuation work order for "Supply of one No. Diesel Driven Ambassador Car on hire basis for the office of the Assistant Engineer, Burdwan Sub-Division, PHE Dte. (Period from 01-09-2024 to 30-11-2024 Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000682/2024-2025 1957/BSD 30/08/2024 91 SK. ASFIA 1.20 0.34 28.33 60
2113 PURBA BARDHAMAN Raina - I Central Mechanical BAJITPUR PIPED WATER SUPPLY SCHEME , SM/16619 New Electric Quotation for new service connection at Bajitpur PWSS, P.H No.-2 BILL/01336/2024-2025 BP-2024-25-429 31/01/2025 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 2.96 0.00 0 null
2114 PURBA BARDHAMAN Ketugram - I Burdwan Division BAKALSA PIPE WATER SUPPLY SCHEME , SM/16030 New Material Requisition To Resource Division RTOR000221/2023-2024 2155/BWD 10/05/2023 Resource Division 12.89 0.00 0 0
2115 PURBA BARDHAMAN Ketugram - I Central Mechanical BAKALSA PIPE WATER SUPPLY SCHEME , SM/16030 New New service connection charges for Bakalsa PWSS TW-1 BILL/00829/2024-2025 BP-2024-25-322 03/10/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.62 0.00 0 0
2116 PURBA BARDHAMAN Ketugram - I Burdwan Division BAKALSA PIPE WATER SUPPLY SCHEME , SM/16030 New Balance Work For OHR, Extension Of Pipeline To Provide FHTC With Sinking Of Tube Well, Construction Of Pump House, Boundary Wall, Land Development, Plinth Protection For Pump House, Approach Road & Other Related Work Under Bakalsa, Chakdaha, Ehaipur, Khatundi And Ketugram (Zone-I) Part-A & B PWSS Under Katwa Sub Division, Block- Ketugram-I, Burdwan Division PHE Dte. Assistant Engineer JUNIOR ENGINEER R.W.S. BURDWAN SUB-DIVISION PHE DTE ORD/000288/2024-2025 2741/BWD 12/07/2024 120 M/S M.M. ENTERPRISE 205.15 0.00 0 65
2117 PURBA BARDHAMAN Ketugram - I Burdwan Division BAKALSA PIPE WATER SUPPLY SCHEME , SM/16030 New BAKALSA Piped Water Supply Scheme with sinking of Tube-well, LDS, Rising Main, FHTC, Construction of switch rooms & boundary walls with gates and land development, drain and internal pathway at different TW site under KETUGRAM -I Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer JUNIOR ENGINEER R.W.S. BURDWAN SUB-DIVISION PHE DTE ORD/000131/2024-2025 2065/BWD 07/06/2024 120 JAHAR GHOSH 94.85 0.00 0 70
2118 PURBA BARDHAMAN Ketugram - I Central Mechanical BAKALSA PIPE WATER SUPPLY SCHEME , SM/16030 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at BAKALSA Water Supply Scheme [ Block- KETUGRAM-1 ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. [2nd CALL] Driller In-Charge JUNIOR ENGINEER ORD/000928/2023-2024 4191/CMD 29/08/2023 485 MITRA ASSOCIATE 20.63 6.93 33.59 44
2119 PURBA BARDHAMAN Ketugram - I Central Mechanical BAKALSA PIPE WATER SUPPLY SCHEME , SM/16030 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at Bakalsa Water Supply Scheme [ Block- Burdwan-1 ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER Junior Engineer ORD/000905/2023-2024 4169/CMD 29/08/2023 580 M/S, S.DAS AND ENTERPRISE. 29.71 0.00 0 50
2120 PURBA BARDHAMAN Purbasthali - II Burdwan Division GHUNI PIPE WATER SUPPLY SCHEME , SM/16034 New Material Requisition To Resource Division RTOR000262/2023-2024 2197/BWD 12/05/2023 Resource Division 12.84 0.00 0 0
2121 PURBA BARDHAMAN Purbasthali - II Burdwan Division GHUNI PIPE WATER SUPPLY SCHEME , SM/16034 New Material Requisition To Resource Division RTOR000503/2023-2024 4027/BWD 08/09/2023 Resource Division 1.09 0.00 0 0
2122 PURBA BARDHAMAN Purbasthali - II Burdwan Division GHUNI PIPE WATER SUPPLY SCHEME , SM/16034 New Material Requisition To Resource Division RTOR000585/2023-2024 4929/BWD 10/11/2023 Resource Division 39.66 0.00 0 0
2123 PURBA BARDHAMAN Purbasthali - II Central Mechanical GHUNI PIPE WATER SUPPLY SCHEME , SM/16034 New NEW SERVICE CONNECTION FOR GHUNI PIPED WATER SUPPLY SCHEME. BILL/02829/2023-2024 BP-2023-24-596 04/03/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 4.04 0.00 0 0
2124 PURBA BARDHAMAN Purbasthali - II Central Mechanical GHUNI PIPE WATER SUPPLY SCHEME , SM/16034 New NEW SERVICE CONNECTION FOR BILL/02826/2023-2024 BP-2023-24-595 04/03/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.93 0.00 0 0
2125 PURBA BARDHAMAN Purbasthali - II Central Mechanical GHUNI PIPE WATER SUPPLY SCHEME , SM/16034 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Joykrishnapur & others water supply scheme under Purbasthali-2,jamalpur,kalna 1 Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000101/2024-2025 2398/CMD 02/08/2024 90 MS S G ENTERPRISE 53.43 0.00 0 0
2126 PURBA BARDHAMAN Purbasthali - II Burdwan Division GHUNI PIPE WATER SUPPLY SCHEME , SM/16034 New work Order "CONSTRUCTION OF TEMPORARY KIOSK FOR THE NECESSARY ARRANGEMENT OF ELECTRIFICATION OF TUBEWELL FOR GHUNI PWSS UNDER KALNA SUB-DIVISION UNDER BURDWAN DIVISION, PHE DTE.". Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000565/2024-2025 1014/KSD 07/08/2024 15 DEL DELTA CONSTRUCTION 0.66 0.00 0 100
2127 PURBA BARDHAMAN Purbasthali - II Central Mechanical GHUNI PIPE WATER SUPPLY SCHEME , SM/16034 New Supply & Installation of Submersible Pumping Machinery , Voltage Stabilizer, Chlorination system and internal House wiring for Tube well no.- 1 & 2 at GHUNI [PURBASTHALI-II] Water Supply Scheme under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000889/2023-2024 4152/CMD 29/08/2023 30 S.K. ELECTRICALS 20.78 0.00 0 90
2128 PURBA BARDHAMAN Purbasthali - II Burdwan Division GHUNI PIPE WATER SUPPLY SCHEME , SM/16034 New Work order for " DESIGNING,MAKING AND ERECTION OF SIGN BOARD FOR SAJAL GRAM IN ¿¿4 No... VILLAGE, ¿PURBASTHALI-II BLOCK UNDER KALNA SUB DIVISION WITHIN BURDWAN DIVISION PHE DTE.(12nos board)". Assistant Engineer Junior Engineer, R.W.S. Burdwan Sub Division, P.H.E. Dt ORD/000952/2024-2025 1985/KSD 09/12/2024 10 OMKAR ENTERPRISE 1.68 0.00 0 100
2129 PURBA BARDHAMAN Purbasthali - II Burdwan Division GHUNI PIPE WATER SUPPLY SCHEME , SM/16034 New Different works related (sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of different capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site) to GHUNI & JOYKRISHNAPUR Piped Water Supply Scheme under Purbasthali II Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000492/2023-2024 3510/BWD 10/08/2023 598 BKB INFRA PROJECTS PRIVATE LIMITED 551.42 0.00 0 20
2130 PURBA BARDHAMAN Purbasthali - II Central Mechanical GHUNI PIPE WATER SUPPLY SCHEME , SM/16034 New CONTINUATION ORDER -Hiring of inspection vehicle (Diesel/CNG/LPG Driven) for supervision of site for the office of the Assistant engineer ,under CMD,PHE,Dte. [W.E.F-01/12/2024 to 30/01/2025] [Under JJM Works] ASSISTANT ENGINEER Junior Engineer ORD/000563/2024-2025 1377/CMSD 28/11/2024 61 PRODYUT GHOSH 0.80 0.79 98.75 0
2131 PURBA BARDHAMAN Burdwan Division AUGUMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR RASULPUR , SM/15701 Augmentation Preparation and Submission of DPR for Augmentation of Rasulpur PWSS under Memari-I Development Block under Burdwan Division, P.H.E Dte.[2nd Call] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. Junior Engineer, RWS, Memari-I Dev. Bolck ORD/000395/2023-2024 1583/BSD 24/07/2023 15 GEO-SOLUTION 0.78 0.77 98.72 100
2132 PURBA BARDHAMAN Burdwan Division AUGUMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR RASULPUR , SM/15701 Augmentation Sinking of 300 X 200mm dia Tube Well 150 mtr. Depth by D.R. Rig method using UPVC pipe (CD) and UPVC Deep Well Screen (RDS) for SASINARA Z-II W/S Scheme at Kalsi Mouza, RASULPUR W/S Scheme at 4th TW site & ALIPUR W/S Scheme at 4th TW site under Memari-I Block under within Burdwan Sub-Division, PHE Dte. [For 3 Nos. Tube well]. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000159/2023-2024 2455/BWD 31/05/2023 60 SUSUNIA GP CO. OPERATIVE LABOUR CONTRACT AND CONSTRUCTION SOCIETY LTD. 39.76 0.00 0 100
2133 PURBA BARDHAMAN Central Mechanical AUGUMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR RASULPUR , SM/15701 Augmentation Quotation for New Electric Connection for Rasulpur Augmentation W/S Scheme TW No. - 4 BILL/01735/2023-2024 BP-2023-24-254 07/12/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 10.09 0.00 0 0
2134 PURBA BARDHAMAN Central Mechanical AUGUMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR RASULPUR , SM/15701 Augmentation Supply & installation of Automatic Chlorinator at Rasulpur water supply scheme, P.H. No.- II under CMD, P.H.E. Dte., Dist.- Purba Bardhaman. ASSISTANT ENGINEER Junior Engineer ORD/001750/2023-2024 18/CMSD 04/01/2024 12 MS S M ELECTRICAL 0.96 0.00 0 100
2135 PURBA BARDHAMAN Burdwan Division AUGUMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR RASULPUR , SM/15701 Augmentation Installation of air valve with valve Chamber and installation of pressure gauge for improvement of valve pressure at dist.line,repairing valve chamber with RCC cover slab and interconnection of valve chamber with upvc pipe for draining out waste water at Head work site of RASULPUR PWSS under Memari-I Dev.Block under Bardhaman Sadar south sub-Divn,PHE Dte Junior Engineer, RWS, Memari-I Dev. Bolck ORD/000118/2024-2025 997/BSD 06/06/2024 30 DEBASHISH ENTERPRISE 0.83 0.00 0 0
2136 PURBA BARDHAMAN Burdwan Division AUGUMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR RASULPUR , SM/15701 Augmentation Construction of switch rooms & Rising main at different TW site for RASULPUR Piped Water Supply Scheme under Memari - I Block, District:- Purba-Bardhaman under Burdwan Division, PHE. Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. Junior Engineer, RWS, Memari-I Dev. Bolck ORD/000881/2023-2024 5356/BWD 06/12/2023 60 SANDIP SARKAR 7.43 0.00 0 95
2137 PURBA BARDHAMAN Central Mechanical AUGUMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR RASULPUR , SM/15701 Augmentation Supply & Installation of Submersible Pumping Machinery , Voltage Stabilizer, Chlorination system and internal House wiring for Tube well no.- 1&2 at Augumentation of Rasulpur Water Supply Scheme under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER Junior Engineer ORD/000089/2023-2024 2594/CMD 07/06/2023 30 CHOUDHURY ENTERPRISE 22.76 0.00 0 50
2138 PURBA BARDHAMAN Burdwan Division AUGUMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR RASULPUR , SM/15701 Augmentation Extension of pipe line and replacing damaged pipe line at Swayerpar Uttar for RASULPUR and its adj.mouza W/S Scheme,Block:Memari-I within Burdwan Sub-Division,PHE Dte Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. Junior Engineer, RWS, Memari-I Dev. Bolck ORD/001174/2023-2024 533/BSD 14/03/2024 30 DEBASHISH ENTERPRISE 0.93 0.00 0 100
2139 PURBA BARDHAMAN Burdwan Division AUGUMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR RASULPUR , SM/15701 Augmentation Extension of height of Boundary Wall by Angle Rolled Section and Barbed Wire and Roof treatment of Pump house for Rasulpur and its Adjoining Mouza W/S Scheme, block -Memari-I within Burdwan Sub-Division ,PHE Dte Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. Junior Engineer, RWS, Memari-I Dev. Bolck ORD/000300/2024-2025 1282/BSD 12/07/2024 60 GHOSH CONSTRUCTION 1.27 0.61 48.03 98
2140 PURBA BARDHAMAN Burdwan Division AUGUMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR RASULPUR , SM/15701 Augmentation Restoration of concrete road by Cement concrete (mix 1:1.5:3), Providing balance FHTC, parallel pipeline, drainage system, boundary wall, Bridge, land development, Sluice valve chamber for smooth water supply of FHTC work for RASULPUR PWSS and its adjoining mouzas within MEMARI-I BLOCK under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000982/2024-2025 4474/BWD 19/12/2024 90 SARKAR AGENCY 91.74 0.00 0 0
2141 PURBA BARDHAMAN Mangolkote Burdwan Division BALIDANGA PIPE WATER SUPPLY SCHEME , SM/18315 New Material Requisition To Resource Division RTOR000225/2023-2024 2155/BWD 10/05/2023 Resource Division 13.45 0.00 0 0
2142 PURBA BARDHAMAN Mangolkote Burdwan Division BALIDANGA PIPE WATER SUPPLY SCHEME , SM/18315 New Material Requisition To Resource Division RTOR000409/2023-2024 3871/BWD 01/09/2023 Resource Division 88.34 0.00 0 0
2143 PURBA BARDHAMAN Mangolkote Burdwan Division BALIDANGA PIPE WATER SUPPLY SCHEME , SM/18315 New Material Requisition To Resource Division RTOR000649/2023-2024 5097/BWD 23/11/2023 Resource Division 19.96 0.00 0 0
2144 PURBA BARDHAMAN Mangolkote Central Mechanical BALIDANGA PIPE WATER SUPPLY SCHEME , SM/18315 New NEW SERVICE CONNECTION FOR BALIDANGA PWSS. BILL/02474/2023-2024 BP-2023-24-530 13/02/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 4.70 0.00 0 0
2145 PURBA BARDHAMAN Mangolkote Central Mechanical BALIDANGA PIPE WATER SUPPLY SCHEME , SM/18315 New NEW SERVICE CONNECTION FOR BALIDANGA PWSS. BILL/02475/2023-2024 BP-2023-24-531 13/02/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 12.76 0.00 0 0
2146 PURBA BARDHAMAN Mangolkote Burdwan Division BALIDANGA PIPE WATER SUPPLY SCHEME , SM/18315 New Supply of 1 (one) No. Inspection Vehicle for different JJM Related Works as and when required including supply of driver and fuels (Minimum 8 Hours of duty) under Katwa Sub-Division within Burdwan Division, P.H.E. Dte. Consider 96.00 Km run per Day. Assistant Engineer JUNIOR ENGINEER KATWA SUB-DIVISION PHE DTE ORD/001080/2023-2024 22/KTS 05/01/2024 70 AJIT SAMANTA 0.90 0.00 0 100
2147 PURBA BARDHAMAN Mangolkote Burdwan Division BALIDANGA PIPE WATER SUPPLY SCHEME , SM/18315 New BALIDANGA Piped Water Supply Scheme with sinking of Tube-well, LDS, Rising Main, FHTC, Construction of 300 cum capacity RCC OHR with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drain and internal pathway at different TW site under Mongolkote Block, District:- Purba-Bardhaman [NEW SCHEME]_2ND CALL Assistant Engineer JUNIOR ENGINEER KATWA SUB-DIVISION PHE DTE ORD/000457/2023-2024 3439/BWD 08/08/2023 365 M/S S.S. ENTERPRISE 567.39 0.00 0 27
2148 PURBA BARDHAMAN Mangolkote Burdwan Division BALIDANGA PIPE WATER SUPPLY SCHEME , SM/18315 New Balance work for OHR, Extension of pipeline to provide FHTC in NAYAPARA IRSANDA, SALANDA & KALAIPARA mouza with sinking of Tubewell, Construction of Pump house, Boundary wall, Land Development, Plinth Protection for pump house & OHR under BALIDANGA PWSS, Katwa Sub-Division, Block- Mongolkote, Burdwan Division PHE Dte. Assistant Engineer JUNIOR ENGINEER KATWA SUB-DIVISION PHE DTE ORD/000684/2024-2025 3654/BWD 21/10/2024 120 CHIRANJIB DAS 174.81 0.00 0 25
2149 PURBA BARDHAMAN Mangolkote Burdwan Division BALIDANGA PIPE WATER SUPPLY SCHEME , SM/18315 New Material Requisition To Resource Division RTOR000031/2024-2025 311/BWD 15/01/2025 Resource Division 7.90 0.00 0 0
2150 PURBA BARDHAMAN Mangolkote Central Mechanical BALIDANGA PIPE WATER SUPPLY SCHEME , SM/18315 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at BALIDANGA Water Supply Scheme [ Block- MANGOLKOTE ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. Driller In-Charge Junior Engineer ORD/000883/2023-2024 4146/CMD 29/08/2023 563 CHOUDHURY ENTERPRISE 29.70 0.00 0 46
2151 PURBA BARDHAMAN Mangolkote Central Mechanical BALIDANGA PIPE WATER SUPPLY SCHEME , SM/18315 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Lakshimpur & others water supply scheme under Mangalkote Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman Driller In-Charge Junior Engineer ORD/000097/2024-2025 2406/CMD 02/08/2024 290 CHOUDHURY ENTERPRISE 57.65 0.00 0 10
2152 PURBA BARDHAMAN Memari - I Burdwan Division CHANCHAL PIPED WATER SUPPLY SCHEME , SM/18609 New Material Requisition To Resource Division RTOR000291/2023-2024 2197/BWD 12/05/2023 Resource Division 17.41 0.00 0 0
2153 PURBA BARDHAMAN Memari - I Burdwan Division CHANCHAL PIPED WATER SUPPLY SCHEME , SM/18609 New Material Requisition To Resource Division RTOR000532/2023-2024 4294/BWD 29/09/2023 Resource Division 1.69 0.00 0 0
2154 PURBA BARDHAMAN Memari - I Central Mechanical CHANCHAL PIPED WATER SUPPLY SCHEME , SM/18609 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1, 2 & 3 at CHANCHAL Water Supply Scheme [ Block- MEMARI-1 ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER Junior Engineer ORD/000788/2023-2024 4078/CMD 29/08/2023 30 UNIVERSAL ENTERPRISES 44.10 0.00 0 0
2155 PURBA BARDHAMAN Memari - I Burdwan Division CHANCHAL PIPED WATER SUPPLY SCHEME , SM/18609 New Material Requisition To Resource Division RTOR000572/2023-2024 4922/BWD 10/11/2023 Resource Division 41.11 0.00 0 0
2156 PURBA BARDHAMAN Memari - I Central Mechanical CHANCHAL PIPED WATER SUPPLY SCHEME , SM/18609 New New Service connection for Chanchal PWSS TW-1. BILL/02335/2023-2024 BP-2023-24-476 31/01/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 9.26 0.00 0 0
2157 PURBA BARDHAMAN Memari - I Central Mechanical CHANCHAL PIPED WATER SUPPLY SCHEME , SM/18609 New New Service connection for Chanchal PWSS TW-2. BILL/02334/2023-2024 BP-2023-24-477 31/01/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 14.29 0.00 0 0
2158 PURBA BARDHAMAN Memari - I Burdwan Division CHANCHAL PIPED WATER SUPPLY SCHEME , SM/18609 New Different works related (sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of different capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site) to CHANCHAL & NUDIPUR Piped Water Supply Scheme under Memari I Block, District:- Purba-Bardhaman [NEW SCHEME] ORD/000692/2023-2024 4389/BWD 05/10/2023 365 MANASH GHOSH 1,343.97 0.00 0 20
2159 PURBA BARDHAMAN Memari - I Central Mechanical CHANCHAL PIPED WATER SUPPLY SCHEME , SM/18609 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at SAHAPUR & others water supply scheme under Memari-I Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. ASSISTANT ENGINEER Junior Engineer ORD/000100/2024-2025 2392/CMD 02/08/2024 90 MITRA ENTERPRISE 47.62 0.00 0 0
2160 PURBA BARDHAMAN Memari - I Burdwan Division CHANCHAL PIPED WATER SUPPLY SCHEME , SM/18609 New Shifting of 11KV HTOH Line for construction of new OHR of Chanchal pwss under Burdwan Division, PHE Dte. [Ref ID-860319929, App ID-100000124989, dt.-10/12/2024] BILL/01092/2024-2025 1172/JJM 17/12/2024 WBSEDCL 7.00 0.00 0 0
2161 PURBA BARDHAMAN Memari - I Burdwan Division CHANCHAL PIPED WATER SUPPLY SCHEME , SM/18609 New Material Requisition To Resource Division RTOR000038/2024-2025 318/BWD 15/01/2025 Resource Division 1.15 0.00 0 0
2162 PURBA BARDHAMAN Central Mechanical Solarisation of WBSEDCL energised electrical installation at PWSS PART-II at different Blocks under CentralMechanical Division,PHED District Purba Bardhaman , SM/18991 Solarisation of WBSEDCL energised electrical installations at PWSS of different Blocks in the district Purba Bardhaman under Central Mechanical Division, PHE Dte. ORD/001091/2023-2024 4675/CMD 02/11/2023 180 A K INDUSTRIES 85.51 0.00 0 0
2163 PURBA BARDHAMAN Central Mechanical Solarisation of WBSEDCL energised electrical installation at PWSS PART-II at different Blocks under CentralMechanical Division,PHED District Purba Bardhaman , SM/18991 WBSEDCL solar quotation for Sajiara PH-1, PWSS. BILL/00148/2024-2025 BP-2024-25-64 06/05/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 0.31 0.00 0 0
2164 PURBA BARDHAMAN Central Mechanical Solarisation of WBSEDCL energised electrical installation at PWSS PART-II at different Blocks under CentralMechanical Division,PHED District Purba Bardhaman , SM/18991 WBSEDCL Solar quotation for Lohana PH-1, PWSS. BILL/00147/2024-2025 BP-2024-25-65 06/05/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 0.31 0.00 0 0
2165 PURBA BARDHAMAN Central Mechanical Solarisation of WBSEDCL energised electrical installation at PWSS PART-II at different Blocks under CentralMechanical Division,PHED District Purba Bardhaman , SM/18991 Quotation for installation of Solar Plant (Net Billing) at Tendul W/S Scheme PH-1. BILL/00860/2024-2025 BP-2024-25-328 03/10/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 0.22 0.00 0 0
2166 PURBA BARDHAMAN Central Mechanical Solarisation of WBSEDCL energised electrical installation at PWSS PART-II at different Blocks under CentralMechanical Division,PHED District Purba Bardhaman , SM/18991 Quotation for solar power at Bhatar Z-I TW-1 PWSS BILL/00825/2024-2025 BP-2024-25-330 03/10/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 0.01 0.00 0 0
2167 PURBA BARDHAMAN Central Mechanical Solarisation of WBSEDCL energised electrical installation at PWSS PART-II at different Blocks under CentralMechanical Division,PHED District Purba Bardhaman , SM/18991 Quotation for installation of solar plant at Natu W/S Scheme for PH-1 BILL/00859/2024-2025 BP-2024-25-329 03/10/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 0.22 0.00 0 0
2168 PURBA BARDHAMAN Central Mechanical Solarisation of WBSEDCL energised electrical installation at PWSS PART-II at different Blocks under CentralMechanical Division,PHED District Purba Bardhaman , SM/18991 Quotation for installation of Solar Plant (Net billing) at Murga W/S Scheme PH-2. BILL/00861/2024-2025 BP-2024-25-327 03/10/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 0.22 0.00 0 0
2169 PURBA BARDHAMAN Central Mechanical Solarisation of WBSEDCL energised electrical installation at PWSS PART-II at different Blocks under CentralMechanical Division,PHED District Purba Bardhaman , SM/18991 Quotation for new Solar service connection at Khandaghosh PWSS TW-1 BILL/01090/2024-2025 BP-2024-25-400 22/11/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 0.22 0.00 0 0
2170 PURBA BARDHAMAN Central Mechanical Solarisation of WBSEDCL energised electrical installation at PWSS PART-II at different Blocks under CentralMechanical Division,PHED District Purba Bardhaman , SM/18991 Quotation for new electric solar service connection at Kaity PWSS TW-1 BILL/01089/2024-2025 BP-2024-25-399 22/11/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 0.22 0.00 0 0
2171 PURBA BARDHAMAN Central Mechanical Solarisation of WBSEDCL energised electrical installation at PWSS PART-II at different Blocks under CentralMechanical Division,PHED District Purba Bardhaman , SM/18991 Application for solar power connection at Nabagram PWSS TW-2. BILL/01224/2024-2025 BP-2024-25-414 16/12/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 0.01 0.00 0 0
2172 PURBA BARDHAMAN Central Mechanical Solarisation of WBSEDCL energised electrical installation at PWSS PART-II at different Blocks under CentralMechanical Division,PHED District Purba Bardhaman , SM/18991 Application for solar power connection at Raipur PWSS TW-1. BILL/01225/2024-2025 BP-2024-25-415 16/12/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 0.01 0.00 0 0
2173 PURBA BARDHAMAN Central Mechanical Solarisation of WBSEDCL energised electrical installation at PWSS PART-II at different Blocks under CentralMechanical Division,PHED District Purba Bardhaman , SM/18991 Application for solar power connection at Rasulpur PWSS TW-1. BILL/01226/2024-2025 BP-2024-25-416 16/12/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 0.01 0.00 0 0
2174 PURBA BARDHAMAN Central Mechanical Solarisation of WBSEDCL energised electrical installation at PWSS PART-II at different Blocks under CentralMechanical Division,PHED District Purba Bardhaman , SM/18991 SOLAR APPLICATION FEE PAYMENT BILL/01341/2024-2025 BP-2024-25-434 31/01/2025 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 0.01 0.00 0 null
2175 PURBA BARDHAMAN Central Mechanical Solarisation of WBSEDCL energised electrical installation at PWSS PART-II at different Blocks under CentralMechanical Division,PHED District Purba Bardhaman , SM/18991 Application for solar power at Deriapur Pwss. BILL/01363/2024-2025 BP-2024-25-439 31/01/2025 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 0.01 0.00 0 null
2176 PURBA BARDHAMAN Central Mechanical Solarisation of WBSEDCL energised electrical installation at PWSS PART-II at different Blocks under CentralMechanical Division,PHED District Purba Bardhaman , SM/18991 SOLAR APPLICATION FEE PAYMENT BILL/01340/2024-2025 BP-2024-25-435 31/01/2025 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 0.01 0.00 0 null
2177 PURBA BARDHAMAN Central Mechanical Solarisation of WBSEDCL energised electrical installation at PWSS PART-II at different Blocks under CentralMechanical Division,PHED District Purba Bardhaman , SM/18991 SOLAR APPLICATION FEE PAYMENT BILL/01339/2024-2025 BP-2024-25-436 31/01/2025 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 0.01 0.00 0 null
2178 PURBA BARDHAMAN Central Mechanical Solarisation of WBSEDCL energised electrical installation at PWSS PART-II at different Blocks under CentralMechanical Division,PHED District Purba Bardhaman , SM/18991 SOLAR APPLICATION FEE PAYMENT BILL/01338/2024-2025 BP-2024-25-437 31/01/2025 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 0.01 0.00 0 null
2179 PURBA BARDHAMAN Central Mechanical Solarisation of WBSEDCL energised electrical installation at PWSS PART-II at different Blocks under CentralMechanical Division,PHED District Purba Bardhaman , SM/18991 COST OF METER FOR NET BILLING (SOLAR) ,KAITHAN PWSS PH-1 BILL/01356/2024-2025 BP-2024-25-440 31/01/2025 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 0.22 0.00 0 null
2180 PURBA BARDHAMAN Central Mechanical Solarisation of WBSEDCL energised electrical installation at PWSS PART-II at different Blocks under CentralMechanical Division,PHED District Purba Bardhaman , SM/18991 Application for solar power at Anguna Pwss BILL/01364/2024-2025 BP-2024-25-438 31/01/2025 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 0.01 0.00 0 null
2181 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED RAINA (PART-B) PWSS TO ACCOMODATE FHTC IN RAINA-I BLOCK WITH IN PURBA BARDHAMAN DISTRICT UNDER BURDWAN DIVISION PHE DTE. , SM/19113 Augmentation Restoration of village road damaged by laying pipeline at Nandipara Kalitala,Ranapara and Raina Co-Operative Society of Augmentation of Raina Water Supply Scheme at Raina-I Block within under Burdwan Division,PHE Dte Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000999/2023-2024 117/BSD 18/01/2024 15 SOUMYAVASH DAS 0.92 0.46 50 100
2182 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED RAINA (PART-B) PWSS TO ACCOMODATE FHTC IN RAINA-I BLOCK WITH IN PURBA BARDHAMAN DISTRICT UNDER BURDWAN DIVISION PHE DTE. , SM/19113 Augmentation Repairing and restore pipe line dammaged by laying of pipeline at different location of Augmentation of RAINA and its adjoining mouza's Piped W/S Scheme at Raina-I Block within Burdwan Sub Division under Burdwan Division, P.H.E. Dte ORD/001001/2023-2024 118/BSD 18/01/2024 30 POMPA CONSTRUCTION CO. 0.94 0.00 0 100
2183 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED RAINA (PART-B) PWSS TO ACCOMODATE FHTC IN RAINA-I BLOCK WITH IN PURBA BARDHAMAN DISTRICT UNDER BURDWAN DIVISION PHE DTE. , SM/19113 Augmentation Balance work OHR Connection, Platform, Laying Parallel Pipeline, providing FHTC, Construction of Boundary Wall, Drain & Pathway at Head Work site & Repairing of Pump House at Head Work site & 2nd Tube Well Site for AUGMENTATION OF RAINA PIPED WATER SUPPLY SCHEME, Block- Raina-I, within Burdwan Sub Division under Burdwan Division PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000173/2024-2025 2268/BWD 18/06/2024 120 RANADHIR SINHA 96.75 0.00 0 0
2184 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED RAINA (PART-B) PWSS TO ACCOMODATE FHTC IN RAINA-I BLOCK WITH IN PURBA BARDHAMAN DISTRICT UNDER BURDWAN DIVISION PHE DTE. , SM/19113 Augmentation Construction of boundary wall (128.40 Mtr.) including switch room at 3rd tube well site (New) of Aug. of RAINA and its adj. mouzas Piped W/S. Scheme under Budwan Division, PHE. Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000185/2024-2025 2398/BWD 26/06/2024 60 RANADHIR SINHA 19.41 0.00 0 0
2185 PURBA BARDHAMAN Ausgram - II Burdwan Division PANDUK PIPED WATER SUPPLY SCHEME , SM/18445 New Material Requisition To Resource Division RTOR000363/2023-2024 2197/BWD 12/05/2023 Resource Division 7.25 0.00 0 0
2186 PURBA BARDHAMAN Ausgram - II Burdwan Division PANDUK PIPED WATER SUPPLY SCHEME , SM/18445 New Material Requisition To Resource Division RTOR000415/2023-2024 3840/BWD 01/09/2023 Resource Division 55.98 0.00 0 0
2187 PURBA BARDHAMAN Ausgram - II Burdwan Division PANDUK PIPED WATER SUPPLY SCHEME , SM/18445 New Material Requisition To Resource Division RTOR000565/2023-2024 4919/BWD 10/11/2023 Resource Division 53.67 0.00 0 0
2188 PURBA BARDHAMAN Ausgram - II Burdwan Division PANDUK PIPED WATER SUPPLY SCHEME , SM/18445 New Material Requisition To Resource Division RTOR000768/2023-2024 204/BWD 10/01/2024 Resource Division 12.89 0.00 0 0
2189 PURBA BARDHAMAN Ausgram - II Central Mechanical PANDUK PIPED WATER SUPPLY SCHEME , SM/18445 New Quotation for new service connection for Panduk PWSS PH 1. BILL/00221/2024-2025 BP-2024-25-112 28/05/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 5.47 0.00 0 0
2190 PURBA BARDHAMAN Ausgram - II Central Mechanical PANDUK PIPED WATER SUPPLY SCHEME , SM/18445 New Quotation for new service connection for Panduk PWSS PH 3. BILL/00223/2024-2025 BP-2024-25-114 28/05/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.39 0.00 0 0
2191 PURBA BARDHAMAN Ausgram - II Central Mechanical PANDUK PIPED WATER SUPPLY SCHEME , SM/18445 New Quotation for new service connection for Panduk PWSS PH 2. BILL/00222/2024-2025 BP-2024-25-113 28/05/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 9.92 0.00 0 0
2192 PURBA BARDHAMAN Ausgram - II Central Mechanical PANDUK PIPED WATER SUPPLY SCHEME , SM/18445 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Chora, Kalaijhuti & others water supply scheme under Ausgram-2 Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. Driller In-Charge JUNIOR ENGINEER ORD/000143/2024-2025 2405/CMD 02/08/2024 90 NABAUDYOG ELECTRICAL ENGINEERING CO-OPERATIVE SOCIETY LTD 95.26 0.00 0 0
2193 PURBA BARDHAMAN Ausgram - II Durgapur W/S Division PANDUK PIPED WATER SUPPLY SCHEME , SM/18445 New Acceptance cum Formal Work Order for Sinking of 300X200 mm dia TW,Pump House,Boundary wall concrete road & bituminous road restoration ,Jack pushing with laying of MS Pipe FHTC and land development of H/W Site drain & Internal pathway laying of MS pipe under Bhedia PWSS (JJM),Block-Aushgram-II,Dist-Purba Bardhaman under Durgapur W/S Division,PHE Dte. Assistant Engineer-II JUNIOR ENGINEER-2 ORD/000170/2024-2025 1611/DWSD 26/11/2024 90 SUPRIYA RAY 87.54 0.00 0 0
2194 PURBA BARDHAMAN Ausgram - II Central Mechanical PANDUK PIPED WATER SUPPLY SCHEME , SM/18445 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1, 2 & 3 at PANDUK Water Supply Scheme [ Block- AUSGRAM-2 ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. Driller In-Charge JUNIOR ENGINEER ORD/000794/2023-2024 4082/CMD 29/08/2023 611 PADMA ENGINEERING CO. 41.68 0.00 0 67
2195 PURBA BARDHAMAN Ausgram - II Durgapur W/S Division PANDUK PIPED WATER SUPPLY SCHEME , SM/18445 New FORMAL WORK ORDER FOR Balance work for Construction of Boundary wall, dismantling concrete road including mending work, construction of approach road by fill-up stone dust, bolders on lowland at OHR site and etc. allied work under PANDUK PWSS, Block-Ausgram-II under DURGAPUR W/S DIVISION, PHE DTE. Assistant Engineer-II JUNIOR ENGINEER-1 ORD/000265/2024-2025 257/DWSD 11/02/2025 90 M/S PIONEER CONSTRUCTION 124.43 0.00 0 100
2196 PURBA BARDHAMAN Ausgram - II Burdwan Division PANDUK PIPED WATER SUPPLY SCHEME , SM/18445 New PANDUK Piped Water Supply Scheme with sinking of Tube-well, LDS, Rising Main, FHTC, Construction of 500 cum capacity RCC OHR with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drain and internal pathway at different TW site under Ausgram-II Block, District:- Purba-Bardhaman [NEW SCHEME]_2ND CALL ORD/000483/2023-2024 3505/BWD 10/08/2023 691 M/S PIONEER CONSTRUCTION 722.29 0.00 0 80
2197 PURBA BARDHAMAN Katwa - II Burdwan Division AMUL PIPED WATER SUPPLY SCHEME , SM/18458 New Material Requisition To Resource Division RTOR000209/2023-2024 2155/BWD 10/05/2023 Resource Division 4.61 0.00 0 0
2198 PURBA BARDHAMAN Katwa - II Burdwan Division AMUL PIPED WATER SUPPLY SCHEME , SM/18458 New Material Requisition To Resource Division RTOR000435/2023-2024 3851/BWD 01/09/2023 Resource Division 43.58 0.00 0 0
2199 PURBA BARDHAMAN Katwa - II Central Mechanical AMUL PIPED WATER SUPPLY SCHEME , SM/18458 New New Service connection for Amul PWSS TW-2 BILL/02348/2023-2024 BP-2023-24-465 31/01/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 2.77 0.00 0 0
2200 PURBA BARDHAMAN Katwa - II Central Mechanical AMUL PIPED WATER SUPPLY SCHEME , SM/18458 New New Service connection for Amul PWSS TW-1 BILL/02347/2023-2024 BP-2023-24-464 31/01/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 2.91 0.00 0 0
2201 PURBA BARDHAMAN Katwa - II Central Mechanical AMUL PIPED WATER SUPPLY SCHEME , SM/18458 New Quotation for new service connection at Amul PWSS PH-3 BILL/00386/2024-2025 BP-2024-25-207 18/07/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.67 0.00 0 0
2202 PURBA BARDHAMAN Katwa - II Central Mechanical AMUL PIPED WATER SUPPLY SCHEME , SM/18458 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Mulgram & others water supply scheme under Katwa-II Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. ASSISTANT ENGINEER Junior Engineer ORD/000070/2024-2025 2409/CMD 02/08/2024 90 DUTTA ENTERPRISE 50.18 0.00 0 0
2203 PURBA BARDHAMAN Katwa - II Burdwan Division AMUL PIPED WATER SUPPLY SCHEME , SM/18458 New Material Requisition To Resource Division RTOR000018/2024-2025 4106/BWD 25/11/2024 Resource Division 14.47 0.00 0 0
2204 PURBA BARDHAMAN Katwa - II Burdwan Division AMUL PIPED WATER SUPPLY SCHEME , SM/18458 New Different works related (sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of different capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site) to AMUL & AURIA Piped Water Supply Scheme under Katwa ¿ II Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer JUNIOR ENGINEER KATWA SUB-DIVISION PHE DTE ORD/000389/2023-2024 3198/BWD 24/07/2023 707 MANASH GHOSH 1,418.89 0.00 0 48
2205 PURBA BARDHAMAN Katwa - II Central Mechanical AMUL PIPED WATER SUPPLY SCHEME , SM/18458 New Hiring of Inspection Vehicle ( Diesel/CNG/LPG Driven) for supervision of JJM works under the jurisdiction of the Driller In charge, Bardhaman Mechanical Sub Division(Drilling) under CMD, PHE, Dte ,wef : 01/ 09/ 20 24 to 31/10/2024. Driller In-Charge JUNIOR ENGINEER ORD/000488/2024-2025 528/DIC/BMSD(D) 23/08/2024 61 SUBRATA BHADRA 0.81 0.74 91.36 0
2206 PURBA BARDHAMAN Katwa - II Central Mechanical AMUL PIPED WATER SUPPLY SCHEME , SM/18458 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1, 2 & 3 at AMUL Water Supply Scheme [ Block- KATWA-2 ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. Driller In-Charge Junior Engineer ORD/000795/2023-2024 4083/CMD 29/08/2023 615 JAL PRAVAHIKA PVT LTD 44.40 0.00 0 31
2207 PURBA BARDHAMAN Mangolkote Burdwan Division SIMULIA PIPE WATER SUPPLY SCHEME , SM/18459 New Material Requisition To Resource Division RTOR000323/2023-2024 2197/BWD 12/05/2023 Resource Division 18.62 0.00 0 0
2208 PURBA BARDHAMAN Mangolkote Burdwan Division SIMULIA PIPE WATER SUPPLY SCHEME , SM/18459 New Material Requisition To Resource Division RTOR000528/2023-2024 4303/BWD 29/09/2023 Resource Division 4.13 0.00 0 0
2209 PURBA BARDHAMAN Mangolkote Burdwan Division SIMULIA PIPE WATER SUPPLY SCHEME , SM/18459 New Material Requisition To Resource Division RTOR000809/2023-2024 307/BWD 24/01/2024 Resource Division 32.21 0.00 0 0
2210 PURBA BARDHAMAN Mangolkote Central Mechanical SIMULIA PIPE WATER SUPPLY SCHEME , SM/18459 New New service connection charges for Shimulia PWSS TW-1 BILL/02197/2023-2024 BP-2023-24-376 16/01/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.42 0.00 0 0
2211 PURBA BARDHAMAN Mangolkote Central Mechanical SIMULIA PIPE WATER SUPPLY SCHEME , SM/18459 New New service connection charges for Simulia PWSS TW-2 BILL/02196/2023-2024 BP-2023-24-377 16/01/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.22 0.00 0 0
2212 PURBA BARDHAMAN Mangolkote Burdwan Division SIMULIA PIPE WATER SUPPLY SCHEME , SM/18459 New Different works related (sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of different capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site) to SIMULIA & LAKSHIMPUR Piped Water Supply Scheme under Mongalkote Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer JUNIOR ENGINEER R.W.S. BURDWAN SUB-DIVISION PHE DTE ORD/000694/2023-2024 4363/BWD 04/10/2023 365 PUSPA ENTERPRISE 1,090.95 0.00 0 37
2213 PURBA BARDHAMAN Mangolkote Central Mechanical SIMULIA PIPE WATER SUPPLY SCHEME , SM/18459 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Lakshimpur & others water supply scheme under Mangalkote Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman Driller In-Charge Junior Engineer ORD/000097/2024-2025 2406/CMD 02/08/2024 290 CHOUDHURY ENTERPRISE 57.65 0.00 0 10
2214 PURBA BARDHAMAN Mangolkote Central Mechanical SIMULIA PIPE WATER SUPPLY SCHEME , SM/18459 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1, 2 & 3 at SIMULIA Water Supply Scheme [ Block- MONGOLKOTE ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. Driller In-Charge Junior Engineer ORD/000796/2023-2024 4084/CMD 29/08/2023 610 P.K. ENGINEERING 41.62 0.00 0 31
2215 PURBA BARDHAMAN Mangolkote Burdwan Division SIMULIA PIPE WATER SUPPLY SCHEME , SM/18459 New Different types of works involve in connection with implementation of Gohgram, Jabagram, Kherua, Lakshmipur & Simulia Piped Water Supply Scheme under Mongolkote Block within Katwa Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer ORD/001301/2024-2025 936/BWD 11/03/2025 180 M/S GHOSH CONSTRUCTION 360.68 0.00 0 0
2216 PURBA BARDHAMAN Mangolkote Burdwan Division SIMULIA PIPE WATER SUPPLY SCHEME , SM/18459 New Road crossing through bituminus PWD road by Jack Pushing method of different location under the command area of KASHIARA (SM/12080, SM/15562) & SIMULIA (SM/18459) PWSS under Mongalkote Block under Katwa Sub Division under Burdwan Division, PHE. Dte. Assistant Engineer ORD/001309/2024-2025 976/BWD 13/03/2025 45 MANASH GHOSH 48.92 0.00 0 0
2217 PURBA BARDHAMAN Burdwan - II Burdwan Division Ichalabad Piped Water Supply Scheme , SM/18404 New Material Requisition To Resource Division RTOR000281/2023-2024 2197/BWD 12/05/2023 Resource Division 8.88 0.00 0 0
2218 PURBA BARDHAMAN Burdwan - II Burdwan Division Ichalabad Piped Water Supply Scheme , SM/18404 New Material Requisition To Resource Division RTOR000439/2023-2024 3848/BWD 01/09/2023 Resource Division 15.12 0.00 0 0
2219 PURBA BARDHAMAN Burdwan - II Central Mechanical Ichalabad Piped Water Supply Scheme , SM/18404 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at Ichalabad Water Supply Scheme [ Block- Burdwan-2 ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ORD/000906/2023-2024 4170/CMD 29/08/2023 30 J.S. CONSTRUCTION. 29.71 0.00 0 0
2220 PURBA BARDHAMAN Burdwan - II Burdwan Division Ichalabad Piped Water Supply Scheme , SM/18404 New Material Requisition To Resource Division RTOR000672/2023-2024 5062/BWD 23/11/2023 Resource Division 20.46 0.00 0 0
2221 PURBA BARDHAMAN Burdwan - II Central Mechanical Ichalabad Piped Water Supply Scheme , SM/18404 New Quotation for new service connection for Ichalabad PWSS PH 1. BILL/00230/2024-2025 BP-2024-25-121 29/05/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 36.60 0.00 0 0
2222 PURBA BARDHAMAN Burdwan - II Central Mechanical Ichalabad Piped Water Supply Scheme , SM/18404 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at KUSHA & others water supply scheme under Bardhaman-II Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman ASSISTANT ENGINEER Junior Engineer ORD/000065/2024-2025 2389/CMD 02/08/2024 90 DILIP MAHATO 53.14 0.00 0 0
2223 PURBA BARDHAMAN Burdwan - II Burdwan Division Ichalabad Piped Water Supply Scheme , SM/18404 New Material Requisition To Resource Division RTOR000025/2024-2025 RTOR000025/2024-2025 15/01/2025 Resource Division 7.42 0.00 0 0
2224 PURBA BARDHAMAN Burdwan - II Burdwan Division Ichalabad Piped Water Supply Scheme , SM/18404 New Different works related (sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of different capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site) to ICHALABAD & HATSIMUL Piped Water Supply Scheme under Burdwan ¿ II Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. Junior Engineer, Burdwan Sadar Sub-Division ORD/000423/2023-2024 3292/BWD 31/07/2023 365 M/S NATIONAL CONSTRUCTION 1,617.18 0.00 0 25
2225 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Putsuri Piped Water Supply Scheme , SM/06963 Retrofitting Continuation work order for Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Putsuri village of Putsuri piped water supply scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. [Phase-I](Tr No.-546/BWD/2020-21) AE(HQs) J.E. 2 BURDWAN ORD/000268/2020-2021 3532/BWD 25/09/2020 30 PRONAB KUMAR DEY 4.92 4.92 100 1
2226 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Putsuri Piped Water Supply Scheme , SM/06963 Retrofitting Continuation work order for Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Denur village of Putsuri piped water supply scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. [Phase-I](Tr No.-562/BWD/2020-21) AE(HQs) J.E. 2 BURDWAN ORD/000355/2020-2021 3804/BWD 08/10/2020 30 IJABUL SEKH 4.92 4.92 100 1
2227 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Putsuri Piped Water Supply Scheme , SM/06963 Retrofitting Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of Putsuri Piped Water Supply Scheme at Denur (6 Nos Habitation Part) & Putsuri (11 Nos Habitation Part) Village (Mouza), Monteswar Block under Burdwan Division, PHE Dte.(Agreement No. 55/2020-2021 OF SE/CC/PHE. DTE.) AE(HQs) J.E. 2 BURDWAN ORD/000125/2020-2021 4887/BWD 07/12/2020 90 M/S S. CHOUDHURY 77.12 54.79 71.05 1
2228 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Putsuri Piped Water Supply Scheme , SM/06963 Retrofitting Load Enhancement charges bill for Putsuri water supply scheme under Burdwan Division, PHE Dte.[Application No.-5003378053, Consumer Id-500684865] VCH/000392/2022-2023 300/DW/22-23 05/07/2022 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LTD. 1.56 0.00 0 0
2229 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Putsuri Piped Water Supply Scheme , SM/06963 Retrofitting Supply of 10 mm NB Gun-metal Ferrule conforming to IS: 2692-1989 for Water tap connection in each house hold from existing distribution system within Scheme jurisdiction in different Piped Water Supply Scheme within Kalna Sub-Division under Burdwan Division, PHE. Dte. and delivered at Borsul Divl. Store. [Part-5]. AE(HQs) J.E. 2 BURDWAN ORD/000090/2021-2022 3590/BWD 13/07/2021 30 PREMANANDA ROY BISWAS 127.50 0.00 0 1
2230 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Putsuri Piped Water Supply Scheme , SM/06963 Retrofitting Extension of 75 mm dia UPVC pipeline at different places of Denur village under Putsuri & its adjoining mouzas water supply scheme within Kalna Sub-Division under Burdwan Division, PHE Dte.[SL NO.-C] Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000839/2020-2021 169/KSD 19/02/2021 30 M/S S. CHOUDHURY 2.37 0.00 0 1
2231 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Putsuri Piped Water Supply Scheme , SM/06963 Retrofitting Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of PUTSURI Piped Water Supply Scheme at Kasa (6 Nos. Habs.), Purba Balarampur, Bhurkunda (7 Nos. Habs.), Patun (5 Nos. Habs.) & Bigha (3 Nos. Habs.) Village (Mouza), Monteswar Block under Burdwan Division, PHE Dte. Assistant Engineer ORD/000302/2021-2022 7020/BWD 17/12/2021 60 INVENT ENGINEERS CO. OPERATIVE SOCIETY LTD. 53.94 5.38 9.97 1
2232 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Putsuri Piped Water Supply Scheme , SM/06963 Retrofitting Laying of different dia.UPVC pipeline at the damaged portion from Denur to Mousa Daukadanga under Putsuri & its adjoining mouzas water supply scheme within Kalna Sub-Division, under Burdwan Division, PHE Dte. Assistant Engineer ORD/000778/2021-2022 6013/BWD 05/10/2021 30 D.M. ENTERPRISE 23.17 0.00 0 1
2233 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Putsuri Piped Water Supply Scheme , SM/06963 Retrofitting Work Order for "Providing Functional house hold tap connections for Sajal Gram villages within Monteswar Block under Kalna Sub-Division under Burdwan Division, PHE Dte. (Putsuri water supply Scheme) (Sl No-9) JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000029/2023-2024 344/KSD 17/04/2023 30 HASAN CONSTRUCTION 0.88 0.00 0 0
2234 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Putsuri Piped Water Supply Scheme , SM/06963 Retrofitting Work Order for "Providing Functional house hold tap connections for Sajal Gram Village within Monteswar Block under Kalna Sub-Division under Burdwan Division, PHE Dte. (Putsuri water supply scheme)" Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000028/2023-2024 344/KSD 17/04/2023 30 HASAN CONSTRUCTION 0.88 0.00 0 0
2235 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Putsuri Piped Water Supply Scheme , SM/06963 Retrofitting Hire & fuel charges of vehicle (Car No.-WB-04G-7127) for the office of the Assistant Engineer, Kalna Sub-Division, PHE Dte. for the month of March & April'23. BILL/00457/2023-2024 367/JJM 18/07/2023 PARTHA PRATIM ACHARYA 0.77 0.00 0 0
2236 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Putsuri Piped Water Supply Scheme , SM/06963 Retrofitting Hire & fuel charges of vehicle Car No.-WB-41H-3668 for the month of May & June'2023. BILL/01039/2023-2024 744/JJM 11/10/2023 MD HASIN 0.53 0.00 0 0
2237 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Putsuri Piped Water Supply Scheme , SM/06963 Retrofitting Relaying of different dia UPVC Pipeline at the different damage portion towards Mojaharnagar, Gulita, Denur & Putsuri of Putsuri PWSS within Kalna Sub-Division under Burdwan Division, PHE Dte. (Sl No-B) Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000322/2021-2022 985/KSD Dt- 24.09.2021 24/09/2021 30 M/S S. CHOUDHURY 3.66 3.65 99.73 100
2238 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Putsuri Piped Water Supply Scheme , SM/06963 Retrofitting Providing FHTC with laying of 75 mm dia HDPE Pipe of Putsuri PWSS of near Health Centre under Manteswar Block under Durgapur Sub Division of Burdwan Division ,P.H.E.Dte Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer1, Durgapur Sub-Division, PHE Dte. ORD/001183/2023-2024 272/DSD 15/03/2024 30 SAYAK DEY 0.97 0.00 0 0
2239 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Putsuri Piped Water Supply Scheme , SM/06963 Retrofitting Providing FHTC with laying of 75 mm dia HDPE Pipe of Putsuri PWSS of Ghosh para village under Manteswar Block under Durgapur Sub Division of Burdwan Division ,P.H.E.Dte Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer1, Durgapur Sub-Division, PHE Dte. ORD/001182/2023-2024 271/DSD 15/03/2024 30 SAYAK DEY 0.97 0.00 0 100
2240 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Putsuri Piped Water Supply Scheme , SM/06963 Retrofitting Work order for "Interconnection of rising main from 4th Tube Well site to Over Head Reservoir for FHTC related water supply under Putsuri W/S Scheme within Kalna Sub-Division under Burdwan Division , PHE Dte." Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer1, Durgapur Sub-Division, PHE Dte. ORD/000554/2023-2024 1309/KSD 23/08/2023 15 PRONAB KUMAR DEY 2.10 0.00 0 100
2241 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Putsuri Piped Water Supply Scheme , SM/06963 Retrofitting Conducting physical Household Survey at the IMIS reported village for HGJ certification and providing balance FHTC for Har Ghar Jal certification including conducting Gram Sabhas for different IMIS reported villages across the district under Burdwan Division, PHE Dte. AE(HQs),Assistant Engineer ,Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE.,Assistant Engineer, Durgapur Sub Division, P.H.E. Dte JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000428/2024-2025 3107/BWD 12/08/2024 90 TUBGRAM GRAMMYAK UNNAYAN SAMITY 309.60 0.00 0 50
2242 PURBA BARDHAMAN Burdwan Division Retrofitting wroks for Providing Functional Household Tap Connection (FHTC) within the command area of of Amarun Piped Water Supply Scheme, Block Bhatar, District Purba Bardhaman , SM/08105 Retrofitting Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Arrah village and arrah habitation of AMARUN piped water supply scheme within Durgapur (bardhaman North) Sub-Division under Burdwan Division, PHE Dte. [Phase-I](Tr No.-542/BWD/2020-21) Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000252/2020-2021 3346/BWD 18/09/2020 30 M.R. CONSTRUCTION CO. 4.86 4.86 100 1
2243 PURBA BARDHAMAN Burdwan Division Retrofitting wroks for Providing Functional Household Tap Connection (FHTC) within the command area of of Amarun Piped Water Supply Scheme, Block Bhatar, District Purba Bardhaman , SM/08105 Retrofitting Continuation work order for Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Amarun village and Amarun habitation of Amarun piped water supply scheme within Durgapur (Bardhaman North) Sub-Division under Burdwan Division, PHE Dte. [Phase-I][Tr No.-508/BWD/20-21] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000383/2020-2021 4793/BWD 03/12/2020 30 BHARAT CONSTRUCTION 4.87 4.80 98.56 1
2244 PURBA BARDHAMAN Burdwan Division Retrofitting wroks for Providing Functional Household Tap Connection (FHTC) within the command area of of Amarun Piped Water Supply Scheme, Block Bhatar, District Purba Bardhaman , SM/08105 Retrofitting Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Amarun village and Amarun habitation of Amarun piped water supply scheme within Durgapur (Bardhaman North) Sub-Division under Burdwan Division, PHE Dte. [Phase-I](Tr No.-805/BWD/2020-21) Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000382/2020-2021 3345/BWD 18/09/2020 30 BHARAT CONSTRUCTION 4.87 4.87 100 1
2245 PURBA BARDHAMAN Burdwan Division Retrofitting wroks for Providing Functional Household Tap Connection (FHTC) within the command area of of Amarun Piped Water Supply Scheme, Block Bhatar, District Purba Bardhaman , SM/08105 Retrofitting Continuation work order for Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Arra village and Arrah habitation of Amarun piped water supply scheme within Durgapur (Bardhaman North) Sub-Division under Burdwan Division, PHE Dte. [Phase-I] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000624/2020-2021 4989/BWD 10/12/2020 30 M.R. CONSTRUCTION CO. 4.86 4.86 100 1
2246 PURBA BARDHAMAN Burdwan Division Retrofitting wroks for Providing Functional Household Tap Connection (FHTC) within the command area of of Amarun Piped Water Supply Scheme, Block Bhatar, District Purba Bardhaman , SM/08105 Retrofitting Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of AMARUN (Z-I & II) Piped Water Supply Scheme at Arra, Amarun, Nawada, Sunur (Part), Eora, Palsona & Bijyapur Village (Mouza), Bhatar Block under Burdwan Division, PHE Dte. Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000317/2021-2022 7086/BWD 22/12/2021 60 NATIONAL CONSTRUCTION 85.05 80.10 94.18 1
2247 PURBA BARDHAMAN Burdwan Division Retrofitting wroks for Providing Functional Household Tap Connection (FHTC) within the command area of of Amarun Piped Water Supply Scheme, Block Bhatar, District Purba Bardhaman , SM/08105 Retrofitting Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of AMARUN (Z-II) Piped Water Supply Scheme at Hanrgram (4 Nos. Habs.), Erachya (6 Nos. Habs.) Village (Mouza), Bhatar Block under Burdwan Division, PHE Dte. Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000363/2021-2022 7157/BWD 24/12/2021 60 S.S. CONSTRUCTION 76.46 8.94 11.69 1
2248 PURBA BARDHAMAN Burdwan Division Retrofitting wroks for Providing Functional Household Tap Connection (FHTC) within the command area of of Amarun Piped Water Supply Scheme, Block Bhatar, District Purba Bardhaman , SM/08105 Retrofitting Relaying for shifting of distribution line at Eora village for construction of Box culvert by PWD Department within Amarun and its adjoining mouzas W/S Scheme (Zone-I) under Durgapur Sub-Division, Burdwan Division, P.H.E. Dte. [Gr.-B] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000313/2022-2023 525/DSD 22/08/2022 15 BHARAT CONSTRUCTION 0.73 0.00 0 0
2249 PURBA BARDHAMAN Burdwan Division Retrofitting wroks for Providing Functional Household Tap Connection (FHTC) within the command area of of Amarun Piped Water Supply Scheme, Block Bhatar, District Purba Bardhaman , SM/08105 Retrofitting Construction of Temporary Approach road to HW site for Augmentation of Amarun (Zone-II ) Piped water supply Scheme , P.H.E Dte. Block:-Bhatar, Dist: Purba Bardhaman. [Gr.-F] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000136/2022-2023 347/DSD 30/06/2022 21 M/S S. CHOUDHURY 1.04 1.04 100 100
2250 PURBA BARDHAMAN Burdwan Division Retrofitting wroks for Providing Functional Household Tap Connection (FHTC) within the command area of of Amarun Piped Water Supply Scheme, Block Bhatar, District Purba Bardhaman , SM/08105 Retrofitting Extension of UPVC pipe line of LDS at Bijyapur Mouza for providing FHTC of Amarun and its adjoining mouzas W/S Scheme under Durgapur Sub-Division, Burdwan Division, P.H.E. Dte. [SL-16] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer2, Durgapur Sub-Division, PHE Dte. ORD/000858/2022-2023 715/DSD 30/12/2022 30 SAMANTA CONSTRUCTION 4.83 4.83 100 100
2251 PURBA BARDHAMAN Burdwan Division Retrofitting wroks for Providing Functional Household Tap Connection (FHTC) within the command area of of Amarun Piped Water Supply Scheme, Block Bhatar, District Purba Bardhaman , SM/08105 Retrofitting Restoration of damaged pipeline of distribution main for construction of drain, concrete road etc at various point at Sunur, and Amarun village for providing FHTC within Amarun W/S Scheme (Zone-I &II) in Bhatar Block under Burdwan Division, P.H.E. Dte. [SL-17] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer2, Durgapur Sub-Division, PHE Dte. ORD/000859/2022-2023 716/DSD 30/12/2022 30 SAMANTA CONSTRUCTION 1.93 1.91 98.96 100
2252 PURBA BARDHAMAN Burdwan Division Retrofitting wroks for Providing Functional Household Tap Connection (FHTC) within the command area of of Amarun Piped Water Supply Scheme, Block Bhatar, District Purba Bardhaman , SM/08105 Retrofitting Extension of UPVC pipe line of LDS at Palsona Mouza for providing FHTC of Amarun and its adjoining mouzas W/S Scheme (Phase-II) under Durgapur Sub-Division, Burdwan Division, P.H.E. Dte. [SL-15] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer2, Durgapur Sub-Division, PHE Dte. ORD/000857/2022-2023 714/DSD 30/12/2022 30 SANDIPAN SENGUPTA 4.81 2.40 49.9 100
2253 PURBA BARDHAMAN Burdwan Division Retrofitting wroks for Providing Functional Household Tap Connection (FHTC) within the command area of of Amarun Piped Water Supply Scheme, Block Bhatar, District Purba Bardhaman , SM/08105 Retrofitting Extension of UPVC pipe line of LDS at Nandanarayanpur and Paschimpara for providing FHTC of Amarun and its adjoining mouzas W/S Scheme (Zone-II) under Durgapur Sub-Division, Burdwan Division, P.H.E. Dte. [SL-27] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer2, Durgapur Sub-Division, PHE Dte. ORD/000869/2022-2023 725/DSD 30/12/2022 30 BABA ADHIRA CONSTRUCTION 4.83 2.42 50.1 100
2254 PURBA BARDHAMAN Burdwan Division Retrofitting wroks for Providing Functional Household Tap Connection (FHTC) within the command area of of Amarun Piped Water Supply Scheme, Block Bhatar, District Purba Bardhaman , SM/08105 Retrofitting Extension of UPVC pipe line of LDS at Hanrgram Khaspara, Chhatipara and Daspara for providing FHTC of Amarun and its adjoining mouzas W/S Scheme (Zone-II) under Durgapur Sub-Division, Burdwan Division, P.H.E. Dte.[SL-29] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer2, Durgapur Sub-Division, PHE Dte. ORD/000846/2022-2023 708/DSD 31/12/2022 30 NANGTASWAR CO. OP. LABOUR CONT. AND CONSTRUCTION SOCIETY LTD. 4.61 0.00 0 100
2255 PURBA BARDHAMAN Burdwan Division Retrofitting wroks for Providing Functional Household Tap Connection (FHTC) within the command area of of Amarun Piped Water Supply Scheme, Block Bhatar, District Purba Bardhaman , SM/08105 Retrofitting Sinking of 250 X 150 mm dia Tubewell and Modification to distribution network by making a loop and extension with uPVC pipe to augment the water supply to FHTC at Sunur and Arra village of AMARUN and its adjoining mouzas W/S Scheme (Zone-I) under Durgapur Sub-Division, Burdwan Division, P.H.E. Dte. Assistant Engineer, Durgapur Sub Division, P.H.E. Dte JUNIOR ENGINEER DURGAPUR SUB-DIVISION PHE DTE ORD/001069/2023-2024 1016/BWD 07/03/2024 60 BAMDEB CONSTRUCTION & CO 34.03 0.00 0 80
2256 PURBA BARDHAMAN Burdwan Division Retrofitting wroks for Providing Functional Household Tap Connection (FHTC) within the command area of of Amarun Piped Water Supply Scheme, Block Bhatar, District Purba Bardhaman , SM/08105 Retrofitting Extension of UPVC pipe line of LDS at Kubajpur Adibasipara and Erachya for providing FHTC of Amarun and its adjoining mouzas W/S Scheme (Zone-II) under Durgapur Sub-Division, Burdwan Division, P.H.E. Dte. [SL-26] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer2, Durgapur Sub-Division, PHE Dte. ORD/000868/2022-2023 724/DSD 30/12/2022 30 NANGTASWAR CO. OP. LABOUR CONT. AND CONSTRUCTION SOCIETY LTD. 4.58 4.58 100 100
2257 PURBA BARDHAMAN Burdwan Division Retrofitting wroks for Providing Functional Household Tap Connection (FHTC) within the command area of of Amarun Piped Water Supply Scheme, Block Bhatar, District Purba Bardhaman , SM/08105 Retrofitting Extension of UPVC pipe line of LDS at Hanrgram Uttarpara, Majhipukur par and Dulepara for providing FHTC of Amarun and its adjoining mouzas W/S Scheme (Zone-II) under Durgapur Sub-Division, Burdwan Division, P.H.E. Dte.[SL-30] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer2, Durgapur Sub-Division, PHE Dte. ORD/000871/2022-2023 727/DSD 30/12/2022 30 RAM MOHAN MUKHERJEE 4.78 0.00 0 100
2258 PURBA BARDHAMAN Burdwan Division Retrofitting wroks for Providing Functional Household Tap Connection (FHTC) within the command area of of Amarun Piped Water Supply Scheme, Block Bhatar, District Purba Bardhaman , SM/08105 Retrofitting Extension of UPVC pipe line of LDS at Ramnagar Mouza for providing FHTC of Amarun and its adjoining mouzas W/S Scheme (Zone-II) under Durgapur Sub-Division, Burdwan Division, P.H.E. Dte. [SL-28] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer2, Durgapur Sub-Division, PHE Dte. ORD/000870/2022-2023 726/DSD 30/12/2022 30 NANGTASWAR CO. OP. LABOUR CONT. AND CONSTRUCTION SOCIETY LTD. 4.16 0.00 0 100
2259 PURBA BARDHAMAN Burdwan Division Providing Functional House Hold Tap Connection (FHTC) by retrofitting within the command area of Ekaihat Piped Water Supply Scheme , SM/07203 Retrofitting Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Akaihat village of Ekaihat piped water supply scheme within Katwa Sub-Division under Burdwan Division, PHE Dte. [Phase-I](Tr No.-196/BWD/2020-21) Assistant Engineer ORD/000107/2020-2021 2597/BWD 04/08/2020 30 JAI MAA DURGA & CO. 4.92 4.92 100 1
2260 PURBA BARDHAMAN Burdwan Division Providing Functional House Hold Tap Connection (FHTC) by retrofitting within the command area of Ekaihat Piped Water Supply Scheme , SM/07203 Retrofitting Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Bikaihat & Akaihat village of Ekaihat piped water supply scheme within Katwa Sub-Division under Burdwan Division, PHE Dte. [Phase-I](Tr No.-169/BWD/2020-21) Assistant Engineer ORD/000106/2020-2021 2598/BWD 04/08/2020 30 JAGADANANDAPUR CO. OP. LABOUR CONTRACT AND CONSTRUCTION SOCIETY LTD. 4.92 4.92 100 1
2261 PURBA BARDHAMAN Burdwan Division Providing Functional House Hold Tap Connection (FHTC) by retrofitting within the command area of Ekaihat Piped Water Supply Scheme , SM/07203 Retrofitting Continuation work order for Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Ekaihat village of Ekaihat piped water supply scheme within Katwa Sub-Division under Burdwan Division, PHE Dte. [Phase-I](Tr No.-329/BWD/2020-21) Assistant Engineer ORD/000261/2020-2021 3739/BWD 07/10/2020 30 JAI MAA DURGA & CO. 1.74 1.74 100 1
2262 PURBA BARDHAMAN Burdwan Division Providing Functional House Hold Tap Connection (FHTC) by retrofitting within the command area of Ekaihat Piped Water Supply Scheme , SM/07203 Retrofitting Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Ekaihat & Bikaihat (Pt-A) village of Ekaihat piped water supply scheme within Katwa Sub-Division under Burdwan Division, PHE Dte. [Phase-I](Tr No.-486/BWD/2020-21) Assistant Engineer ORD/000265/2020-2021 236/KTS 30/09/2020 4 JAI MAA DURGA & CO. 1.29 1.28 99.22 1
2263 PURBA BARDHAMAN Burdwan Division Providing Functional House Hold Tap Connection (FHTC) by retrofitting within the command area of Ekaihat Piped Water Supply Scheme , SM/07203 Retrofitting Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Ekaihat & Bikaihat (Part-B) village of Ekaihat & Bikaihat piped water supply scheme within Katwa Sub-Division under Burdwan Division, PHE Dte. (Tr No.-539/BWD/2020-21) Assistant Engineer ORD/000357/2020-2021 237/KTS 30/09/2020 4 JAGADANANDAPUR CO. OP. LABOUR CONTRACT AND CONSTRUCTION SOCIETY LTD. 1.32 1.32 100 1
2264 PURBA BARDHAMAN Burdwan Division Providing Functional House Hold Tap Connection (FHTC) by retrofitting within the command area of Ekaihat Piped Water Supply Scheme , SM/07203 Retrofitting Continuation work order for Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Bikaihat & Ekaihat village of Ekaihat piped water supply scheme within Katwa Sub-Division under Burdwan Division, PHE Dte. [Phase-I](Tr No.-538/BWD/2020-21) Assistant Engineer ORD/000474/2020-2021 3697/BWD 05/10/2020 30 JAGADANANDAPUR CO. OP. LABOUR CONTRACT AND CONSTRUCTION SOCIETY LTD. 1.79 1.79 100 1
2265 PURBA BARDHAMAN Burdwan Division Providing Functional House Hold Tap Connection (FHTC) by retrofitting within the command area of Ekaihat Piped Water Supply Scheme , SM/07203 Retrofitting Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Ekaihat & Bikaihat village of Ekaihat piped water supply scheme within Katwa Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer ORD/000625/2020-2021 364/KTS 15/12/2020 7 BISHWAJIT DAS 1.18 1.18 100 1
2266 PURBA BARDHAMAN Burdwan Division Providing Functional House Hold Tap Connection (FHTC) by retrofitting within the command area of Ekaihat Piped Water Supply Scheme , SM/07203 Retrofitting Providing Functional Household Tap Connection from existing distribution system within the command area of Akaihat and Bikihat PWSS under Katwa Sub-Division under Burdwan Division PHE Dte. (Sl No-1) Assistant Engineer ORD/000238/2021-2022 750/KTS 24/11/2021 15 JAI MAA DURGA & CO. 2.54 2.52 99.21 1
2267 PURBA BARDHAMAN Burdwan Division Providing Functional House Hold Tap Connection (FHTC) by retrofitting within the command area of Ekaihat Piped Water Supply Scheme , SM/07203 Retrofitting Continuation work order for supply of 10 mm NB Gun-Metal /Brass Ferrul conforming to IS:2692-1989 for water tap connection in each household from existing distribution system within scheme jurisdiction in different piped water supply scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. and delivered at Barsul Divisional Store.[Part-6] Assistant Engineer ORD/000867/2020-2021 4318/BWD 04/11/2020 10 MD HASIN 4.93 0.00 0 1
2268 PURBA BARDHAMAN Burdwan Division Providing Functional House Hold Tap Connection (FHTC) by retrofitting within the command area of Ekaihat Piped Water Supply Scheme , SM/07203 Retrofitting Detail route survey, design of distribution network and preparation of estimate, drawing & DPR for providing FHTC in the scheme EKAIHAT, PANUHAT PWSS (Sl No-2) Assistant Engineer JUNIOR ENGINEER KATWA SUB-DIVISION PHE DTE ORD/000070/2023-2024 394/KTS 13/04/2023 30 SIRCON ENGINEERING SERVICES 2.48 0.00 0 100
2269 PURBA BARDHAMAN Burdwan Division Providing Functional House Hold Tap Connection (FHTC) by retrofitting within the command area of Ekaihat Piped Water Supply Scheme , SM/07203 Retrofitting Vehicle bill [Car No.-WB-04G-6018] for the month of November & December'2023. BILL/02053/2023-2024 1894/JJM 28/03/2024 M/S MUNMUN DEY 0.45 0.00 0 0
2270 PURBA BARDHAMAN Burdwan Division Providing Functional House Hold Tap Connection (FHTC) by retrofitting within the command area of Ekaihat Piped Water Supply Scheme , SM/07203 Retrofitting Vehicle bill [Car No.-WB-04G-6018] for the month of September & October'2023. BILL/02056/2023-2024 1269/JJM 16/01/2024 M/S MUNMUN DEY 0.49 0.00 0 0
2271 PURBA BARDHAMAN Burdwan Division Providing Functional House Hold Tap Connection (FHTC) by retrofitting within the command area of Ekaihat Piped Water Supply Scheme , SM/07203 Retrofitting Necessary FHTC work of Ekaihat PWSS under Katwa Sub-Division Block Katwa-I Burdwan Division PHE Dte. (Sl No -5) Assistant Engineer Junior Engineer, R.W.S., Katwa-I Dev. Block ORD/001052/2024-2025 1609/KTS 14/11/2024 45 HAMID SK 0.95 0.00 0 0
2272 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of SIALI Piped Water Supply Scheme at Jamalpur Block , SM/07856 Retrofitting Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of SIALI Piped Water Supply Scheme at Amarpur (Amarpur Habitation) Village (Mouza), Jamalpur Block under Burdwan Division, PHE Dte. (Agreement No. 572/BWD of 2020-2021) Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000298/2020-2021 439/BWD 19/01/2021 60 M/S ANAND CONSTRUCTION 16.46 0.00 0 1
2273 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of SIALI Piped Water Supply Scheme at Jamalpur Block , SM/07856 Retrofitting Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Reshalatpur village and Reshalatpur habitation of SIALI piped water supply scheme within Burdwan Sub-Division, under Burdwan Division, PHE Dte.[Phase-I] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000694/2020-2021 3321/BWD 18/09/2020 30 MUKHERJEE ENTERPRISE 4.84 0.17 3.51 1
2274 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of SIALI Piped Water Supply Scheme at Jamalpur Block , SM/07856 Retrofitting Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of SIALI Piped Water Supply Scheme at Mudipur (Part), Rasalatpur (Part) Village (Mouza), Jamalpur Block under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000346/2021-2022 58/BWD 05/01/2022 30 BOSE ENTERPRISE 18.34 16.99 92.64 1
2275 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of SIALI Piped Water Supply Scheme at Jamalpur Block , SM/07856 Retrofitting Continuation work order for water tap connection in each house hold from existing distribution system within scheme jurisdiction in Reshalatpur village and Reslatpur habitation of Siali piped water supply scheme under Burdwan Division, PHE Dte.[Phase-I] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000718/2021-2022 7089/BWD 22/12/2021 30 MUKHERJEE ENTERPRISE 3.45 3.11 90.14 1
2276 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of SIALI Piped Water Supply Scheme at Jamalpur Block , SM/07856 Retrofitting Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of SIALI Piped Water Supply Scheme at Siali (Math Siali & Siali Habitation) Village (Mouza), Jamalpur Block under Burdwan Division, PHE Dte._2ND CALL. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000923/2020-2021 1709/BWD 25/02/2021 30 SKILLS AND FACILITY TRAINING INSTITUTE 18.33 17.48 95.36 1
2277 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of SIALI Piped Water Supply Scheme at Jamalpur Block , SM/07856 Retrofitting Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of SIALI Piped Water Supply Scheme at Ujirpur (Par Ujirpur & Ujirpur Habitation) Village (Mouza), Jamalpur Block under Burdwan Division, PHE Dte._2ND CALL. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000922/2020-2021 1546/BWD 22/02/2021 30 SKILLS AND FACILITY TRAINING INSTITUTE 18.87 18.01 95.44 1
2278 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of SIALI Piped Water Supply Scheme at Jamalpur Block , SM/07856 Retrofitting Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of SIALI Piped Water Supply Scheme at Kora (Kora Habitation), Mudipur (Part) (Mudipur (Part) Habitation) & Reshalatpur (Part) (Reshalatpur (Part) Habitation) Village (Mouza), Jamalpur Block under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000642/2020-2021 649/BWD 27/01/2021 60 DHIRENDRANATH SOM 19.53 0.00 0 1
2279 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of SIALI Piped Water Supply Scheme at Jamalpur Block , SM/07856 Retrofitting Re-alignment of damaged distribution pipeline at different section due to road widening (PWD Deptt.) of SIALI piped water supply scheme at Jamalpur Block under Burdwan Division, PHE Dte.[Gr.-G] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000261/2021-2022 667/BSD 08/06/2021 30 RAINBOW CONSTRUCTION 4.70 0.00 0 1
2280 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of SIALI Piped Water Supply Scheme at Jamalpur Block , SM/07856 Retrofitting Extension of uPVC distribution pipe line (Node-128 & 136) in regarding FHTC at Par-Ujirpur village from Sura (Zone-II) water supply scheme within Siali W/S scheme at Jamalpur Development Block. under Burdwan Division, PHE Dte. Gr.B. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000550/2021-2022 370/BSD 02/03/2022 30 BHARAT CONSTRUCTION 3.36 2.78 82.74 1
2281 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of SIALI Piped Water Supply Scheme at Jamalpur Block , SM/07856 Retrofitting Extension of pipeline from existing distribution system within the command area of Siali piped water supply scheme at Siali (Math Siali & Siali Habitation) village mouza under Jamalpur Block under Burdwan Division, PHE Dte. [Gr.-E] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000559/2021-2022 957/BSD 23/07/2021 30 ELECTRONIC SURVILLANCE 3.22 2.81 87.27 1
2282 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of SIALI Piped Water Supply Scheme at Jamalpur Block , SM/07856 Retrofitting Extension of pipeline for providing functional household tap connection at Reshalatpur (Part) of Siali piped water supply scheme within Burdwan Sub-Division under Burdwan Division, PHE Dte.[Gr.-C] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000577/2021-2022 1142/BSD 26/08/2021 30 DHIRENDRANATH SOM 2.49 0.00 0 1
2283 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of SIALI Piped Water Supply Scheme at Jamalpur Block , SM/07856 Retrofitting Extension of pipeline for Providing Functional Household tap connection at Siali Habitation of SIALI Piped Water Supply Scheme under Burdwan Division, P.H.E.Dte. [Group : D] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000037/2022-2023 243/AE/HQ 20/04/2022 30 BOSE ENTERPRISE 3.10 2.92 94.19 1
2284 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of SIALI Piped Water Supply Scheme at Jamalpur Block , SM/07856 Retrofitting Extension of pipeline from existing distribution system within the command area of Siali piped water supply scheme for FHTC at Ujirpur (Par Ujirpur & Ujirpur Habitation) village mouza under Jamalpur Block under Burdwan Division, PHE Dte.[Gr.-F] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000560/2021-2022 958/BSD 23/07/2021 30 ELECTRONIC SURVILLANCE 4.30 3.88 90.23 1
2285 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of SIALI Piped Water Supply Scheme at Jamalpur Block , SM/07856 Retrofitting Extension of pipeline (Branch & Sub Branch) from existing distribution system within the command area of Siali piped water supply scheme for FHTC at Mudipur village and Mudipur habitation within Jamalpur Block under Burdwan Division, PHE Dte.[Gr.-I] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000774/2021-2022 1030/BSD 05/08/2021 30 ELECTRONIC SURVILLANCE 2.16 2.14 99.07 1
2286 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of SIALI Piped Water Supply Scheme at Jamalpur Block , SM/07856 Retrofitting Extension of HDPE pipeline for Providing Functional Household Tap Connection at Amarpur Habitation of SIALI Piped Water Supply Scheme under Burdwan Division,P.H.E.Dte. [Group : E] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000039/2022-2023 244/AE/HQ 20/04/2022 30 BOSE ENTERPRISE 4.11 4.10 99.76 1
2287 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of SIALI Piped Water Supply Scheme at Jamalpur Block , SM/07856 Retrofitting Extension of pipeline for providing functional house hold tap connection at Kora (Part) village of Siali piped water supply scheme within Burdwan Sub-Division under Burdwan Division, PHE Dte. [Gr.-A] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000309/2021-2022 1643/BSD 14/12/2021 30 MUKHERJEE ENTERPRISE 1.73 1.58 91.33 1
2288 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of SIALI Piped Water Supply Scheme at Jamalpur Block , SM/07856 Retrofitting Providing FHTC for 100% coverage at Muidipur, Ujirpur, Reshalatpur, Kora, Siali & Amarpur Habitation (Village) for SIALI piped W/S Scheme, Jamalpur Dev. Block under Burdwan Division, PHE Dte. AE(HQs) Junior Engineer, Burdwan Division ORD/000344/2023-2024 3033/BWD 14/07/2023 264 ANWESHA CONSTRUCTION 31.38 0.41 1.31 100
2289 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) under the command area of Uddharanpur Piped Water Supply Scheme , SM/07546 Retrofitting Formal Work Order for Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of Uddharanpur Piped Water Supply Scheme at Enayetpur, Naihati, Sankhai, Sitahati & Uddharanpur (1 No Habitation) Village (Mouza), Ketugram-II Block under Burdwan Division, PHE Dte. (Agreement No. 97/SE/CC/PHE/Dte of 2020-2021) Assistant Engineer ORD/000416/2020-2021 913/BWD 02/02/2021 60 SATYANARAYAN ENGINEERS CO. OP. SOCIETY LTD. 86.77 47.93 55.24 1
2290 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) under the command area of Uddharanpur Piped Water Supply Scheme , SM/07546 Retrofitting Extension of pipe line from the existing Distribution System within scheme jurisdiction at Uddharanpur village under UDDHARANPUR PWSS under Katwa Sub-Division under Burdwan Division PHE Dte.(Sl No-2) Assistant Engineer ORD/000141/2021-2022 590/KTS 06/09/2021 30 M/S S. CHOUDHURY 4.83 4.82 99.79 1
2291 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) under the command area of Uddharanpur Piped Water Supply Scheme , SM/07546 Retrofitting Extension of pipe line from the existing Distribution System within scheme jurisdiction at Naihati village under UDDHARANPUR PWSS under Katwa Sub-Division under Burdwan Division PHE Dte. (Sl No-3) Assistant Engineer ORD/000142/2021-2022 591/KTS 06/09/2021 30 M/S S. CHOUDHURY 4.83 4.81 99.59 1
2292 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) under the command area of Uddharanpur Piped Water Supply Scheme , SM/07546 Retrofitting Extension of pipe line from the existing Distribution System within scheme jurisdiction at Enayatpur and Sankhai village under UDDHARANPUR PWSS under Katwa Sub-Division under Burdwan Division PHE Dte. (Sl No-1) Assistant Engineer ORD/000140/2021-2022 589/KTS 06/09/2021 30 M/S S. CHOUDHURY 4.85 4.85 100 1
2293 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) under the command area of Uddharanpur Piped Water Supply Scheme , SM/07546 Retrofitting Drinking water supply to 10 Nos ICDS for Uddharanpur water supply scheme Ketugram-II Block under Katwa Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer ORD/000961/2020-2021 36/KTS 18/01/2021 30 MAA KHEPIMAYER CHARANE 4.79 0.00 0 1
2294 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) under the command area of Uddharanpur Piped Water Supply Scheme , SM/07546 Retrofitting Special maintenance and construction of sluice Valve chamber at Uddharanpur Piped water Supply Scheme at Ketugram-II Block, under Katwa Sub-Division within Burdwan Division PHE Dte.[Sl No-2] Assistant Engineer JUNIOR ENGINEER KATWA SUB-DIVISION PHE DTE,JUNIOR ENGINEER R.W.S. BURDWAN SUB-DIVISION PHE DTE ORD/000370/2023-2024 611/KTS 19/06/2023 30 BABUL SK 0.97 0.00 0 100
2295 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) under the command area of Uddharanpur Piped Water Supply Scheme , SM/07546 Retrofitting Special maintenance and construction of sluice Valve chamber at Uddharanpur Piped water Supply Scheme at Ketugram-II Block, under Katwa Sub-Division within Burdwan Division PHE Dte.[Sl No-1] Assistant Engineer JUNIOR ENGINEER KATWA SUB-DIVISION PHE DTE,JUNIOR ENGINEER R.W.S. BURDWAN SUB-DIVISION PHE DTE ORD/000369/2023-2024 610/KTS 19/06/2023 30 BABUL SK 0.97 0.00 0 100
2296 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) under the command area of Uddharanpur Piped Water Supply Scheme , SM/07546 Retrofitting Special maintenance and construction of sluice Valve chamber at Uddharanpur Piped water Supply Scheme at Ketugram-II Block, under Katwa Sub-Division within Burdwan Division PHE Dte.[Sl No-3] Assistant Engineer JUNIOR ENGINEER KATWA SUB-DIVISION PHE DTE,JUNIOR ENGINEER R.W.S. BURDWAN SUB-DIVISION PHE DTE ORD/000371/2023-2024 633/KTS 19/06/2023 30 BABUL SK 0.76 0.00 0 100
2297 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) under the command area of Siptai Piped Water Supply Scheme , SM/07551 Retrofitting Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of Siptai Piped Water Supply Scheme at Shrimanpur Village, Siptai Village, Ilampur Village, Prijpur Village & Gohaldaha Village, Jamalpur Block under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. Junior Engineer, R.W.S. Burdwan Sub Division, P.H.E. Dt ORD/000024/2021-2022 3342/BWD 21/06/2021 45 ASHOK KUMAR GHOSH 41.90 11.72 27.97 1
2298 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) under the command area of Siptai Piped Water Supply Scheme , SM/07551 Retrofitting Extension of pipeline including FHTC for Siptai Piped Water Supply Scheme at Ilampur (30 Nos) habitation for Sajal Gram (As per FIELD VERIFICATION REPORT DULY SIGNED BY PRADHAN FOR HAR GHAR JAL CERTIFICATION) within Jamalpur Block under Burdwan Division, PHE Dte. Gr.S. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. Junior Engineer, R.W.S. Burdwan Sub Division, P.H.E. Dt ORD/000355/2022-2023 1394/BSD 08/08/2022 5 ROY CONSTRUCTION 0.96 0.00 0 1
2299 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) under the command area of Siptai Piped Water Supply Scheme , SM/07551 Retrofitting Extension of pipeline including providing FHTC for SIPTAI Piped Water Supply Scheme at Pirijpur 40 No¿s Habitation for Sajal Gram (As per FIELD VERIFICATION REPORT FOR HAR GHAR JAL CERTIFICATION within Jamalpur under Burdwan Division, PHE Dte. Gr.Q. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. Junior Engineer, R.W.S. Burdwan Sub Division, P.H.E. Dt ORD/000353/2022-2023 1392/BSD 08/08/2022 5 ROY CONSTRUCTION 0.95 0.95 100 1
2300 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) under the command area of Siptai Piped Water Supply Scheme , SM/07551 Retrofitting Extension of pipeline including FHTC for SIPTAI Piped Water Supply Scheme at Pirijpur (40 Nos) Habitation for Sajal Gram (As per field verification report duly signed by Pradhan for Har Ghar Jal Certification) within Jamalpur Block under Burdwan Division, PHE Dte. ORD/000849/2022-2023 1392-A/BSD 08/08/2022 5 ROY CONSTRUCTION 0.95 0.00 0 0
2301 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) under the command area of Siptai Piped Water Supply Scheme , SM/07551 Retrofitting Extension of pipeline including providing FHTC for SIPTAI Piped Water Supply Scheme at Siptai (42 Nos) Habitation for Sajal Gram (As per FIELD VERIFICATION REPORT DULY SIGNED BY PRADHAN FOR HAR GHAR JAL CERTIFICATION) within Jamalpur Block under Burdwan Division, PHE Dte. Gr.R Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. Junior Engineer, R.W.S. Burdwan Sub Division, P.H.E. Dt ORD/000354/2022-2023 1393/BSD 08/08/2022 5 ROY CONSTRUCTION 0.97 0.00 0 100
2302 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) under the command area of Siptai Piped Water Supply Scheme , SM/07551 Retrofitting Extension of pipeline including FHTC for SIPTAI Piped Water Supply Scheme at Siptai (42 Nos) Habitation for Sajal Gram (As per field verification report duly signed by Pradhan for Har Ghar Jal Certification) within Jamalpur Block under Burdwan Division, PHE Dte. ORD/000850/2022-2023 1393-A/BSD 08/08/2022 5 ROY CONSTRUCTION 0.97 0.97 100 100
2303 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) under the command area of Siptai Piped Water Supply Scheme , SM/07551 Retrofitting Extension of pipeline including providing FHTC for Siptai Piped Water Supply Scheme at Ilampur[30 No's],Habitation for Sajal Gram (As per Sajal Gram(As per Field Verification Report duly signed by Pradhan for Har Ghar Jal Certification)within Jamalpur Block under Burdwan Division, PHE Dte. ORD/000851/2022-2023 1394-A/BSD 08/08/2022 5 ROY CONSTRUCTION 0.96 0.96 100 100
2304 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) under the command area of Siptai Piped Water Supply Scheme , SM/07551 Retrofitting Providing FHTC for 100% coverage at Srimanpur (Village) (Habitation) for SIPTAI Piped W/S Scheme, Jamalpur Dev. Block under Burdwan Division, PHE Dte. AE(HQs) Junior Engineer, Burdwan Division ORD/000921/2023-2024 5487/BWD 13/12/2023 30 GOUTAM KUMAR MITRA 4.34 0.00 0 100
2305 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) under the command area of Siptai Piped Water Supply Scheme , SM/07551 Retrofitting Additional work for laying of UPVC pipeline for providing FHTC at Srimanpur (Village) (Habitation) under SIPTAI Piped W/S. Scheme, Jamalpur Dev. Block under Burdwan Division, PHE Dte. AE(HQs) Junior Engineer, Burdwan Division ORD/001030/2023-2024 99/AE/HQ 15/02/2024 30 GOUTAM KUMAR MITRA 0.72 0.00 0 100
2306 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of RAMKRISHNAPUR Piped Water Supply Scheme at Raina-I Block , SM/07873 Retrofitting Providing Functional Household Tap connection (FHTC) from existing distribution system within the command area of Ramkrishnapur piped water supply scheme at Jamui, Fakirpur, Khemta, Ramkrishnapur & Chandipur village (Mouza), Raina-I Block under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000147/2021-2022 4217/BWD 16/08/2021 45 GHOSH CONCERN 36.49 11.91 32.64 1
2307 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of RAMKRISHNAPUR Piped Water Supply Scheme at Raina-I Block , SM/07873 Retrofitting Providing leftout water tap connection in different villages for 100% coverage to make it Sajal Gram from existing distribution system within scheme jurisdiction of different Piped Water Supply Schemes within Raina ¿ I Block under Burdwan Division, PHE. Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000344/2021-2022 39/BWD 05/01/2022 30 HAFIJUR RAHAMAN MIDYA 15.62 0.00 0 1
2308 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of RAMKRISHNAPUR Piped Water Supply Scheme at Raina-I Block , SM/07873 Retrofitting Extension of pipeline for Ramkrishnapur Water Supply Scheme at Ramkrishnapur and chandipur village within Raina-I Block , under Burdwan Division, PHE Dte. Gr.B. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000375/2021-2022 43/BSD 10/01/2022 30 SUPRIYA RAY 4.79 0.00 0 1
2309 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting at Srikhanda PWSS , SM/06773 Retrofitting Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of SRIKHANDA Piped Water Supply Scheme at Katwa - I Block under Burdwan Division, PHE Dte.(Agreement No. 53/2020-2021 OF SE/CC/PHE. DTE.) Assistant Engineer ORD/000121/2020-2021 4880/BWD 07/12/2020 90 ASHOK KUMAR GHOSH 96.84 30.13 31.11 1
2310 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting at Srikhanda PWSS , SM/06773 Retrofitting Continuation work order for supply of 10 mm NB Gun-Metal /Brass Ferrul conforming to IS:2692-1989 for water tap connection in each household from existing distribution system within scheme jurisdiction in different piped water supply scheme within Durgapur (Bardhaman North) Sub-Division under Burdwan Division, PHE Dte. and delivered at Barsul Divisional Store.[Part-7] Assistant Engineer ORD/000348/2021-2022 2942/BWD 04/05/2021 10 KISHORE GHOSH 3.94 3.44 87.31 1
2311 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting at Srikhanda PWSS , SM/06773 Retrofitting Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Bohar village and Bohar habitation of Satgachia piped water supply scheme within Burdwan Sub-Division under Burdwan Division, PHE Dte. [Phase-I](Tr No.-435/BWD/2020-21) ORD/000507/2020-2021 3327/BWD 18/09/2020 30 TARAMA AGENCY 4.86 4.83 99.38 0
2312 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting at Srikhanda PWSS , SM/06773 Retrofitting Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Jakra village and Jakra Paschimpara habitation of Satgachhia piped water supply scheme within Burdwan Sub-Division under Burdwan Division, PHE Dte. [Phase-I](Tr No.-383/BWD/2020-21) ORD/000511/2020-2021 3328/BWD 18/09/2020 30 A R TRADERS 4.86 4.86 100 0
2313 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting at Srikhanda PWSS , SM/06773 Retrofitting Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Jakra (Part) village (Innathgore Habitation) & Bohat (Part) village (Hamunpur Habitation) of Satgachia piped water supply scheme within Burdwan Sub-Division under Burdwan Division, PHE Dte.[Sl No.-21] ORD/000793/2020-2021 71/BWD 05/01/2021 15 A R TRADERS 4.86 4.86 100 0
2314 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting at Srikhanda PWSS , SM/06773 Retrofitting Continuation work order for water tap connection in each house hold from existing distribution system within scheme jurisdiction in Bohar village and Bohar habitation of Satgachia piped water supply scheme within Burdwan Sub-Division under Burdwan Division, PHE Dte.[Phase-I][Gr.-4B] ORD/000794/2020-2021 4990/BWD 10/12/2020 30 TARAMA AGENCY 4.86 4.69 96.5 0
2315 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Pubar Piped Water Supply Scheme at Ausgram-II Block , SM/07807 Retrofitting Extension of pipeline including water tap connection (FHTC) at Pubar Vill [Kamalpur & Pubar (Part) Hab.] of PUBAR and its adjoining mouza's Piped W/S Scheme at Ausgram-II Block within Durgapur Sub Division under Burdwan Division, P.H.E. Dte._2ND CALL. Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000175/2021-2022 6105/BWD 08/10/2021 30 ANWESHA CONSTRUCTION 29.76 0.00 0 1
2316 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Pubar Piped Water Supply Scheme at Ausgram-II Block , SM/07807 Retrofitting Extension of pipeline including water tap connection (FHTC) at Pubar Vill [Kamalpur & Pubar (Part) Hab.] of PUBAR and its adjoining mouza's Piped W/S Scheme at Ausgram-II Block within Durgapur Sub Division under Burdwan Division, P.H.E. Dte._2ND CALL Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000193/2021-2022 6104/BWD 08/10/2021 30 ANWESHA CONSTRUCTION 29.76 29.22 98.19 1
2317 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Pubar Piped Water Supply Scheme at Ausgram-II Block , SM/07807 Retrofitting Providing leftout water tap connection in different villages for 100% coverage to make it Sajal Gram from existing distribution system within scheme jurisdiction of different Piped Water Supply Schemes within Ausgram-II Block under Burdwan Division, PHE. Dte. Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000472/2021-2022 940/BWD 17/02/2022 30 NANDY UDYOG 11.82 0.00 0 0
2318 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Pubar Piped Water Supply Scheme at Ausgram-II Block , SM/07807 Retrofitting Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Pubar (Part) village (Pubar (Part) habitation) of Pubar Piped Water Supply Scheme within Durgapur Sub-Divn. under Burdwan Division, PHE. Dte. [Sl. No. : ¿16¿] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000420/2020-2021 66/BWD 05/01/2021 15 SUBRATA GUPTA 4.86 0.36 7.41 1
2319 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Pubar Piped Water Supply Scheme at Ausgram-II Block , SM/07807 Retrofitting Extension of Pipeline with Providing Functional Household Tap Connection (FHTC) within the command area of PUBER Piped Water Supply Scheme , Block- Ausgram-II within Durgapur (Burdwan North) Sub Division under Burdwan Division, P.H.E. Dte. [Gr.-E] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000457/2021-2022 77/DSD 11/02/2022 30 ANWESHA CONSTRUCTION 4.75 2.94 61.89 1
2320 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Pubar Piped Water Supply Scheme at Ausgram-II Block , SM/07807 Retrofitting Laying parallel pipeline to increase the water supply towards Kaldanda of PUBER and its adjoining mouza's Piped W/S Scheme at Ausgram-II Block within Durgapur Sub Division under Burdwan Division, P.H.E. Dte. [Gr.-C] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000132/2022-2023 344/DSD 30/06/2022 30 ANWESHA CONSTRUCTION 4.81 4.81 100 1
2321 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Pubar Piped Water Supply Scheme at Ausgram-II Block , SM/07807 Retrofitting Relaying of pipeline damaged by construction of Road/Drain etc. at different location of Pubar and its adjoining mouzas water supply scheme at Ausgram-II Block within Durgapur Sub-Division, under Burdwan Division, PHE Dte. [SL-20] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer1, Durgapur Sub-Division, PHE Dte. ORD/000862/2022-2023 719/DSD 30/12/2022 30 ASRUL HAQUE MONDAL 0.88 0.88 100 100
2322 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Kanshra Piped Water Supply Scheme at Jamalpur Block , SM/07816 Retrofitting Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of KANSHRA Piped Water Supply Scheme at Jotkrishtai (Jotkestai Habitation), Kalna (Jotkalna Habitation) & Kanshra (Bhabanipur Habitation) Village (Mouza), Jamalpur Block under Burdwan Division, PHE Dte.(Agreement no. 571/BWD of 2020-2021) AE(HQs) ORD/000332/2020-2021 441/BWD 19/01/2021 60 GENUINE ENGINEERING CO-OP. SOCIETY LTD. 19.48 0.00 0 1
2323 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Kanshra Piped Water Supply Scheme at Jamalpur Block , SM/07816 Retrofitting Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of KANSHRA Piped Water Supply Scheme at Bishnubati (Harekrishnapur Habitation), Jotsubal (Jotsubalpaharpur & Sagar Habitation) Village (Mouza), Jamalpur Block under Burdwan Division, PHE Dte. (Agreement no. 594/BWD of 2020-2021) AE(HQs) ORD/000330/2020-2021 619/BWD 25/01/2021 60 ROY CONSTRUCTION 20.42 0.00 0 1
2324 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Kanshra Piped Water Supply Scheme at Jamalpur Block , SM/07816 Retrofitting Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of KANSHRA Piped Water Supply Scheme at Kalna (Kalnagram & Surakalna Habitation) Village (Mouza), Jamalpur Block under Burdwan Division, PHE Dte. [Agreement No. 639/BWD OF 2020-2021] AE(HQs) ORD/000433/2020-2021 989/BWD 04/02/2021 60 IJABUL SEKH 22.09 21.45 97.1 1
2325 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Kanshra Piped Water Supply Scheme at Jamalpur Block , SM/07816 Retrofitting Laying of uPVC pipe for providing FHTC at Jorbandh habitation of Kanshra Mouza within Kanshra Piped Water Supply Scheme, Jamalpur Block under Burdwan Division P.H.E DTE. [Group: ¿C¿] AE(HQs) ORD/000226/2021-2022 1898/AE/HQ 16/11/2021 30 M/S ANAND CONSTRUCTION 4.62 4.62 100 1
2326 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Kanshra Piped Water Supply Scheme at Jamalpur Block , SM/07816 Retrofitting Extension of pipeline for providing functional house hold tap connection at Jotsubal village within Kanshra water supply scheme under Burdwan Division, PHE Dte. [Gr.-A] AE(HQs) ORD/000866/2020-2021 1256/AE/HQ 15/02/2021 30 ROY CONSTRUCTION 4.84 0.00 0 1
2327 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Kanshra Piped Water Supply Scheme at Jamalpur Block , SM/07816 Retrofitting Laying of uPVC pipe for providing FHTC at Kanshra Village within KANSHRA Piped Water Supply Scheme, Jamalpur Block under Burdwan Division P.H.E Dte. [Group : A] AE(HQs) ORD/000045/2022-2023 199/AE/HQ 06/04/2022 30 DEBASHISH ENTERPRISE 4.84 4.84 100 1
2328 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Kanshra Piped Water Supply Scheme at Jamalpur Block , SM/07816 Retrofitting Laying of 90 mm dia UPVC pipe for providing FHTC at Surekalna habitation of Kalna Mouza within Kanshra piped water supply scheme, at Jamalpur Block under Burdwan Division, PHE Dte.[Gr.-D] AE(HQs) ORD/000752/2021-2022 1899/AE/HQ 16/11/2021 30 SWASTIK ENTERPRISE 4.75 4.58 96.42 1
2329 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Kanshra Piped Water Supply Scheme at Jamalpur Block , SM/07816 Retrofitting Laying of 75 mm and 50 mm dia UPVC pipe for providing FHTC at Kalnagram habitation of Kalna Mouza within Kanshra piped water supply scheme within Jamalpur Block under Burdwan Division, PHE Dte.[Gr.-C] AE(HQs) ORD/000769/2021-2022 1857/AE/HQ 05/10/2021 30 SANJAY SK 3.50 2.73 78 1
2330 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Kanshra Piped Water Supply Scheme at Jamalpur Block , SM/07816 Retrofitting Providing Functional Household Tap Connection (FHTC) at Paharpur & Chikonhati village within the command area of KANSHRA Piped Water Supply Scheme at Jamalpur Block under Burdwan Division, PHE Dte. GROUP : B AE(HQs) ORD/000228/2022-2023 425/AE/HQ 03/08/2022 30 OM ENTERPRISE 4.10 4.10 100 1
2331 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Kanshra Piped Water Supply Scheme at Jamalpur Block , SM/07816 Retrofitting Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of KANSHRA Piped Water Supply Scheme at Kanshra (Jorbandh & Kanshra Habitation) Village (Mouza), Jamalpur Block under Burdwan Division, PHE Dte.[Agreement No. 625/BWD OF 2020-2021] AE(HQs) ORD/000438/2020-2021 957/BWD 03/02/2021 60 DEBASHISH ENTERPRISE 21.87 21.76 99.5 1
2332 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Kanshra Piped Water Supply Scheme at Jamalpur Block , SM/07816 Retrofitting Providing Functional Household Tap Connection (FHTC) at Kalna village within the command area of Kanshra Piped Water Supply Scheme at Jamalpur Block under Burdwan Division, PHE Dte. [Group : C] AE(HQs) ORD/000460/2021-2022 68/AE/HQ 11/02/2022 30 MAA BHABANI CONSTRUCTION 4.81 4.81 100 1
2333 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Kanshra Piped Water Supply Scheme at Jamalpur Block , SM/07816 Retrofitting Laying of UPVC Pipeline for providing FHTC at Kanshra Mouza (Habitation) under KANSHRA Piped Water Supply Scheme, Jamalpur Development Block under Burdwan Division, PHE Dte. AE(HQs) ORD/000067/2023-2024 2018/BWD 28/04/2023 30 TARAMA AGENCY 12.58 12.56 99.84 0
2334 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Kanshra Piped Water Supply Scheme at Jamalpur Block , SM/07816 Retrofitting Interconnection between inlet & delivery pipe with main distribution pipeline within command area of KANSHRA Piped W/S. Scheme, Jamalpur Block under Burdwan Division, PHE. Dte. AE(HQs) J.E. 2 BURDWAN ORD/000826/2022-2023 214/AE/HQ 31/03/2023 30 OM ENTERPRISE 0.87 0.83 95.4 100
2335 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Kanshra Piped Water Supply Scheme at Jamalpur Block , SM/07816 Retrofitting Extension of pipeline for KANSHRA Piped Water Supply Scheme at Badalpur Habitation in Jamalpur Block under Burdwan Division, PHE Dte. AE(HQs) J.E. 2 BURDWAN ORD/000828/2022-2023 216/AE/HQ 31/03/2023 30 DEBASHISH ENTERPRISE 0.95 0.95 100 100
2336 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Kanshra Piped Water Supply Scheme at Jamalpur Block , SM/07816 Retrofitting Construction of sluice valve chamber & supply of sluice valve for extension of pipeline for KANSHRA Piped W/S. Scheme, Jamalpur Block under Burdwan Division, PHE. Dte. AE(HQs) J.E. 2 BURDWAN ORD/000829/2022-2023 217/AE/HQ 31/03/2023 30 DEBASHISH ENTERPRISE 0.92 0.92 100 100
2337 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Kanshra Piped Water Supply Scheme at Jamalpur Block , SM/07816 Retrofitting Extension of pipeline for KANSHRA Piped Water Supply Scheme at Natungram Habitation in Jamalpur Block under Burdwan Division, PHE Dte. AE(HQs) J.E. 2 BURDWAN ORD/000827/2022-2023 215/AE/HQ 31/03/2023 30 DEBASHISH ENTERPRISE 0.95 0.95 100 100
2338 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Kanshra Piped Water Supply Scheme at Jamalpur Block , SM/07816 Retrofitting Extension of pipeline for KANSHRA Piped Water Supply Scheme at Badalpur & Natungram (Habitation) in Jamalpur Development Block for providing water tap connection (FHTC) under Burdwan Division, PHE Dte. AE(HQs) J.E. 2 BURDWAN ORD/000406/2023-2024 421/AE/HQ 02/08/2023 30 DEBASHISH ENTERPRISE 0.95 0.94 98.95 100
2339 PURBA BARDHAMAN Burdwan Division Augmentation of ANUKHAL PWSS for providing Functional Household Tap Connection (FHTC) KALNA-II block under KALNA Sub Division of Burdwan Division in Purba Bardhaman District , SM/09403 Augmentation Preparation of DPR for augmentation of Anukhal W/S Scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. (Sl No-D) Assistant Engineer ORD/000570/2021-2022 206/KSD 23/02/2022 21 INDRANIL DUTTA & ASSOCIATES 2.86 2.82 98.6 1
2340 PURBA BARDHAMAN Burdwan Division Augmentation of ANUKHAL PWSS for providing Functional Household Tap Connection (FHTC) KALNA-II block under KALNA Sub Division of Burdwan Division in Purba Bardhaman District , SM/09403 Augmentation Supply of materials for different water supply scheme under Burdwan Division, PHE Dte. VCH/001578/2021-2022 1207/DW 10/03/2022 EXECUTIVE ENGINEER, RESOURCES DIVISION, P.H.E. DTE. 3,005.00 0.00 0 0
2341 PURBA BARDHAMAN Burdwan Division Augmentation of ANUKHAL PWSS for providing Functional Household Tap Connection (FHTC) KALNA-II block under KALNA Sub Division of Burdwan Division in Purba Bardhaman District , SM/09403 Augmentation Material Requisition To Resource Division RTOR000210/2021-2022 1533/BWD 15/03/2022 Resource Division 0.37 0.00 0 0
2342 PURBA BARDHAMAN Burdwan Division Augmentation of ANUKHAL PWSS for providing Functional Household Tap Connection (FHTC) KALNA-II block under KALNA Sub Division of Burdwan Division in Purba Bardhaman District , SM/09403 Augmentation Material Requisition To Resource Division RTOR000055/2021-2022 531/BWD 27/01/2022 Resource Division 14.56 0.00 0 0
2343 PURBA BARDHAMAN Burdwan Division Augmentation of ANUKHAL PWSS for providing Functional Household Tap Connection (FHTC) KALNA-II block under KALNA Sub Division of Burdwan Division in Purba Bardhaman District , SM/09403 Augmentation Material Requisition To Resource Division RTOR000148/2021-2022 1242/BWD 07/03/2022 Resource Division 4.93 0.00 0 0
2344 PURBA BARDHAMAN Burdwan Division Augmentation of ANUKHAL PWSS for providing Functional Household Tap Connection (FHTC) KALNA-II block under KALNA Sub Division of Burdwan Division in Purba Bardhaman District , SM/09403 Augmentation Material Requisition To Resource Division RTOR000160/2021-2022 1320/BWD 08/03/2022 Resource Division 32.89 0.00 0 0
2345 PURBA BARDHAMAN Burdwan Division Augmentation of ANUKHAL PWSS for providing Functional Household Tap Connection (FHTC) KALNA-II block under KALNA Sub Division of Burdwan Division in Purba Bardhaman District , SM/09403 Augmentation Material Requisition To Resource Division RTOR000041/2022-2023 4627/BWD 17/10/2022 Resource Division 12.32 0.00 0 0
2346 PURBA BARDHAMAN Burdwan Division Augmentation of ANUKHAL PWSS for providing Functional Household Tap Connection (FHTC) KALNA-II block under KALNA Sub Division of Burdwan Division in Purba Bardhaman District , SM/09403 Augmentation Additional work to implement augmentation of ANUKHAL Water Supply Scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000821/2023-2024 4998/BWD 21/11/2023 30 UDYOG CONSTRUCTION 7.48 0.00 0 100
2347 PURBA BARDHAMAN Burdwan Division Augmentation of ANUKHAL PWSS for providing Functional Household Tap Connection (FHTC) KALNA-II block under KALNA Sub Division of Burdwan Division in Purba Bardhaman District , SM/09403 Augmentation Augmentation of ANUKHAL Piped Water Supply Scheme with LDS, FHTC, Rising main, Construction of 250 cum capacity OHR with 20.0 mtr. Staging height inclusive of soil investigation with construction of boundary wall at Headworks site under Kalna-II Block, District:- Purba-Burdwan. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000096/2022-2023 2741/BWD 08/06/2022 365 SINGHA ROY AND CO. 374.09 318.48 85.13 70
2348 PURBA BARDHAMAN Burdwan Division Augmentation of ANUKHAL PWSS for providing Functional Household Tap Connection (FHTC) KALNA-II block under KALNA Sub Division of Burdwan Division in Purba Bardhaman District , SM/09403 Augmentation Quotation from WBSEDCL for Augmentation of Anukhal w/s scheme under Burdwan Division, PHE Dte. P.H. No.-3 & 4. BILL/00907/2024-2025 1046/JJM 30/10/2024 WBSEDCL 17.05 0.00 0 0
2349 PURBA BARDHAMAN Burdwan Division Augmentation of ANUKHAL PWSS for providing Functional Household Tap Connection (FHTC) KALNA-II block under KALNA Sub Division of Burdwan Division in Purba Bardhaman District , SM/09403 Augmentation Sinking of tube well, Laying dist. system, Providing FHTC, construction of Pump House & Boundary and Laying rising main of ANUKHAL Piped Water Supply Scheme within Kalna Sub-Divn. under Burdwan Division, PHE. Dte. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000857/2023-2024 5206/BWD 29/11/2023 120 SINGHA ROY AND CO. 119.49 0.00 0 15
2350 PURBA BARDHAMAN Burdwan Division Augmentation of ANUKHAL PWSS for providing Functional Household Tap Connection (FHTC) KALNA-II block under KALNA Sub Division of Burdwan Division in Purba Bardhaman District , SM/09403 Augmentation Work Order for Supervision and extend support to NABL recognised Water Quality Testing Block level Laboratory under The Assistant Engineer, Kalna Sub-Division, Public Health Engineering Directorate, Government of West Bengal by assigining team of competent resource personnel who will be engeged for complete supervision for retaining NABL recognition and compilation of preparatory up-to-date documentation,Calibration for on-site survelliance by NABL (as per NABL 139) for a period of one month from the date of commencement. (Name of SDL : Anukhal Sub District Water Testing Laboratory under Kalna Sub Division.) Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE,JUNIOR ENGINEER R.W.S. BURDWAN SUB-DIVISION PHE DTE ORD/000672/2023-2024 1335/KSD 28/08/2023 30 BHARATI CHEMICAL & SCIENTIFIC WORKS 0.91 0.00 0 100
2351 PURBA BARDHAMAN Burdwan Division Augmentation of NAOPARA PWSS for providing Functional Household Tap Connection (FHTC) , SM/09407 Augmentation Supply of materials for different water supply scheme under Burdwan Division, PHE Dte. VCH/001578/2021-2022 1207/DW 10/03/2022 EXECUTIVE ENGINEER, RESOURCES DIVISION, P.H.E. DTE. 3,005.00 0.00 0 0
2352 PURBA BARDHAMAN Burdwan Division Augmentation of NAOPARA PWSS for providing Functional Household Tap Connection (FHTC) , SM/09407 Augmentation Preparation of DPR for augmentation of Naopara W/S Scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. (Sl No-I) Assistant Engineer ORD/000576/2021-2022 211/KSD 23/02/2022 21 ROY CHOWDHURY ASSOCIATES 2.43 2.43 100 1
2353 PURBA BARDHAMAN Burdwan Division Augmentation of NAOPARA PWSS for providing Functional Household Tap Connection (FHTC) , SM/09407 Augmentation Laying Rising main and distribution pipeline including Providing Functional Household Tap Connection (FHTC) within the command are of Augmentation of NAOPARA Piped W/S. Scheme under Burdwan Division, PHE. Dte. Assistant Engineer ORD/000003/2022-2023 1870/BWD 05/04/2022 45 KOUSIK MALLICK 66.60 66.49 99.83 1
2354 PURBA BARDHAMAN Burdwan Division Augmentation of NAOPARA PWSS for providing Functional Household Tap Connection (FHTC) , SM/09407 Augmentation Supply and delivery of different dia. CIDF sluice valve for Augmentation of Jahannagar, Ganganandapur, Nowapara & Monteswar Piped Water Supply Scheme within Kalna Sub-Division under Burdwan Division, P.H.E. Dte.[Part ¿ A] Assistant Engineer ORD/000323/2022-2023 3632/BWD 22/08/2022 20 RAMASISH ENTERPRISE 12.80 0.00 0 1
2355 PURBA BARDHAMAN Burdwan Division Augmentation of NAOPARA PWSS for providing Functional Household Tap Connection (FHTC) , SM/09407 Augmentation Work order for Repairing and laying of UPVC pipeline & providing FHTC work from Mallick oil mil to the house of Khalil Sk at Naopara Water Supply Scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000148/2023-2024 397/KSD 02/05/2023 30 ARINDAM BHATTACHARYA 0.99 0.00 0 0
2356 PURBA BARDHAMAN Burdwan Division Augmentation of NAOPARA PWSS for providing Functional Household Tap Connection (FHTC) , SM/09407 Augmentation Material Requisition To Resource Division RTOR000040/2021-2022 542/BWD 27/01/2022 Resource Division 9.97 0.00 0 0
2357 PURBA BARDHAMAN Burdwan Division Augmentation of NAOPARA PWSS for providing Functional Household Tap Connection (FHTC) , SM/09407 Augmentation Material Requisition To Resource Division RTOR000152/2021-2022 1240/BWD 07/03/2022 Resource Division 4.19 0.00 0 0
2358 PURBA BARDHAMAN Burdwan Division Augmentation of NAOPARA PWSS for providing Functional Household Tap Connection (FHTC) , SM/09407 Augmentation Material Requisition To Resource Division RTOR000203/2021-2022 1526/BWD 15/03/2022 Resource Division 0.37 0.00 0 0
2359 PURBA BARDHAMAN Burdwan Division Augmentation of NAOPARA PWSS for providing Functional Household Tap Connection (FHTC) , SM/09407 Augmentation Work order for Repairing and laying of UPVC pipeline & providing FHTC work from wood shop to the house of Patal Das at Naopara Water Supply Scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000147/2023-2024 396/KSD 02/05/2023 30 ER CONSTRUCTION & GENERAL ORDER SUPPLIER 0.99 0.00 0 100
2360 PURBA BARDHAMAN Burdwan Division Augmentation of NAOPARA PWSS for providing Functional Household Tap Connection (FHTC) , SM/09407 Augmentation Work Order for Repairing and laying of UPVC pipeline & providing FHTC work from the house of Habu Sk to the house of Asadul Kha at Naopara Water Supply Scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000127/2023-2024 421/KSD 11/05/2023 30 ER CONSTRUCTION & GENERAL ORDER SUPPLIER 0.97 0.83 85.57 100
2361 PURBA BARDHAMAN Burdwan Division Augmentation of NAOPARA PWSS for providing Functional Household Tap Connection (FHTC) , SM/09407 Augmentation Work Order for "Repairing and laying of UPVC pipeline & providing FHTC work from the shop of Bhoton Sk to the petrol pump at Naopara Water Supply Scheme within Kalna Sub-Division under Burdwan Division, PHE Dte." JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000553/2023-2024 1308/KSD 23/08/2023 30 ER CONSTRUCTION & GENERAL ORDER SUPPLIER 3.59 0.00 0 100
2362 PURBA BARDHAMAN Burdwan Division Augmentation of NAOPARA PWSS for providing Functional Household Tap Connection (FHTC) , SM/09407 Augmentation Work Order for "Ancillary work of Rising Main including Construction of Sluice Valve Chamber & other allied work of Naopara Piped Water Supply Scheme within Kalna Sub-Division under Burdwan Division, PHE Dte." (SL-2) Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/001132/2023-2024 2061/KSD 23/02/2024 20 ER CONSTRUCTION & GENERAL ORDER SUPPLIER 1.69 0.00 0 5
2363 PURBA BARDHAMAN Burdwan Division Augmentation of NAOPARA PWSS for providing Functional Household Tap Connection (FHTC) , SM/09407 Augmentation Work Order for "Restoration of Pipeline of Naopara Piped Water Supply Scheme under Kalna Sub-Division under Burdwan Division, PHE Dte. (Sl-1) Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/001131/2023-2024 2060/KSD 23/02/2024 30 ER CONSTRUCTION & GENERAL ORDER SUPPLIER 2.98 0.00 0 50
2364 PURBA BARDHAMAN Burdwan Division Augmentation of NAOPARA PWSS for providing Functional Household Tap Connection (FHTC) , SM/09407 Augmentation Work Order for "Road Restoration and other ancilliary works under NAOPARA(SM/09407) water supply scheme under Kalna Sub-Division under Burdwan Division, PHE Dte." Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/001191/2023-2024 2198/KSD 15/03/2024 10 ER CONSTRUCTION & GENERAL ORDER SUPPLIER 1.34 0.00 0 50
2365 PURBA BARDHAMAN Burdwan Division Augmentation of NAOPARA PWSS for providing Functional Household Tap Connection (FHTC) , SM/09407 Augmentation Quotation from WBSEDCL for load enhancement charges of Aug Naopara w/s scheme under Burdwan Division, PHE Dte. (Application No.-5004355150)(Ref. ID-500374861) BILL/00903/2024-2025 1047/JJM 30/10/2024 WBSEDCL 1.34 0.00 0 0
2366 PURBA BARDHAMAN Burdwan Division Augmentation of NAOPARA PWSS for providing Functional Household Tap Connection (FHTC) , SM/09407 Augmentation Different Types of work involved in connection with Augmentation of NAOPARA (SM/09407) & HARIPUR (SM/13315) water supply scheme Piped water supply scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000164/2024-2025 2203/BWD 13/06/2024 344 MONDAL & CO. 223.65 0.00 0 50
2367 PURBA BARDHAMAN Burdwan Division Providing Functional House hold Tap Connection (FHTC) by retrofitting at Bharatpur, Nskarbandh and Shaldanga mouzas within the command area of Chaktentul piped Water Supply Scheme at Galsi-I Block under Burdwan Division, P.H.E. DTE. (Pt.-B) , SM/08705 Retrofitting Material Requisition To Resource Division RTOR000115/2021-2022 1103/BWD 26/02/2022 Resource Division 12.30 0.00 0 0
2368 PURBA BARDHAMAN Burdwan Division Providing Functional House hold Tap Connection (FHTC) by retrofitting at Bharatpur, Nskarbandh and Shaldanga mouzas within the command area of Chaktentul piped Water Supply Scheme at Galsi-I Block under Burdwan Division, P.H.E. DTE. (Pt.-B) , SM/08705 Retrofitting Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of CHAKTENTUL Piped Water Supply Scheme at Chaktentul (1 No Part, 2 Nos Habitation), Bharatpur (2 Nos Habitation) Village (Mouza), Galsi-I Block under Burdwan Division, PHE Dte.(Agreement No. 71/2020-2021 OF SE/CC/PHE. DTE.) AE(HQs) J.E. 2 BURDWAN ORD/000128/2020-2021 5005/BWD 10/12/2020 90 SUPRIYA RAY 75.14 25.00 33.27 1
2369 PURBA BARDHAMAN Durgapur W/S Division Providing Functional House hold Tap Connection (FHTC) by retrofitting at Bharatpur, Nskarbandh and Shaldanga mouzas within the command area of Chaktentul piped Water Supply Scheme at Galsi-I Block under Burdwan Division, P.H.E. DTE. (Pt.-B) , SM/08705 Retrofitting Quotation for new service connection at Chaktetul Ausgram -I PWSS under CMD/PHED BILL/00197/2024-2025 BP-2024-25-99 27/11/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED 9.38 0.00 0 0
2370 PURBA BARDHAMAN Durgapur W/S Division Providing Functional House hold Tap Connection (FHTC) by retrofitting at Bharatpur, Nskarbandh and Shaldanga mouzas within the command area of Chaktentul piped Water Supply Scheme at Galsi-I Block under Burdwan Division, P.H.E. DTE. (Pt.-B) , SM/08705 Retrofitting Acceptance cum Formal Work Order for the work of "Sinking of 300 x 200 mm x 150 mtr deapth by DR, Repairing & Renovation of existing OHR, Construction of 01 (One) no 5.25 x 3.25 m Pump House cum Chlorine Room including laying UPVC distribution system (LDS) and interconnection & other allied works at CHAKTETUL PWSS, Block- Galsi-I, Dist- Purba Bardhaman under Durgapur W/S Division, PHE Dte. Assistant Engineer-II Contractual Junior Engineer_1 ORD/000043/2024-2025 759/DWSD 06/06/2024 270 M/S JAYDEEP DASGUPTA 77.42 0.00 0 90
2371 PURBA BARDHAMAN Durgapur W/S Division Providing Functional House hold Tap Connection (FHTC) by retrofitting at Bharatpur, Nskarbandh and Shaldanga mouzas within the command area of Chaktentul piped Water Supply Scheme at Galsi-I Block under Burdwan Division, P.H.E. DTE. (Pt.-B) , SM/08705 Retrofitting Material Requisition To Resource Division RTOR000026/2024-2025 446/DWSD 17/03/2025 Resource Division 0.21 0.00 0 0
2372 PURBA BARDHAMAN Burdwan Division Providing Functional House hold Tap Connection (FHTC) by retrofitting at Bharatpur, Nskarbandh and Shaldanga mouzas within the command area of Chaktentul piped Water Supply Scheme at Galsi-I Block under Burdwan Division, P.H.E. DTE. (Pt.-B) , SM/08705 Retrofitting Providing leftout water tap connection in different villages for 100% coverage to make it Sajal Gram from existing distribution system within scheme jurisdiction of different Piped Water Supply Schemes within Galsi ¿ I Block under Burdwan Division, PHE. Dte._2ND CALL. Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000673/2021-2022 1738/BWD 28/03/2022 30 JYOTI ENTERPRISE 5.72 0.00 0 100
2373 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED SAGRIA PWSS TO ACCOMMODATE FHTC IN KHANDOGHOSH BLOCK UNDER BURDWAN SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/09492 Augmentation Supply of materials for different water supply scheme under Burdwan Division, PHE Dte. VCH/001578/2021-2022 1207/DW 10/03/2022 EXECUTIVE ENGINEER, RESOURCES DIVISION, P.H.E. DTE. 3,005.00 0.00 0 0
2374 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED SAGRIA PWSS TO ACCOMMODATE FHTC IN KHANDOGHOSH BLOCK UNDER BURDWAN SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/09492 Augmentation Route Survey & Preparation of DPR for Sagrai W/S Scheme under Khandaghosh Block under Burdwan Sub-Division under Burdwan Division PHE Dte. Sl No.11. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000500/2021-2022 186/BSD 31/01/2022 30 RADIANT 2.92 2.91 99.66 1
2375 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED SAGRIA PWSS TO ACCOMMODATE FHTC IN KHANDOGHOSH BLOCK UNDER BURDWAN SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/09492 Augmentation Sinking of 300 X 200mm dia Tube Well 150 mtr. Depth by D.R. Rig method using UPVC pipe (CM) and UPVC Deep Well Screen (RMS) for Augmentation of SAGRAI & its adjoining mouzas Piped Water Supply Scheme, Block - Khandaghosh, Dist - Purba Bardhaman under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000516/2022-2023 4613/BWD 17/10/2022 30 M/S SYCHROTECH INDUSTRY 10.22 8.15 79.75 0
2376 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED SAGRIA PWSS TO ACCOMMODATE FHTC IN KHANDOGHOSH BLOCK UNDER BURDWAN SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/09492 Augmentation Augmentation of SAGRAI Piped Water Supply Scheme with LDS, FHTC, Rising Main with necessary interconnections & Construction of 400 Cum capacity OHR with 20.0 Mtr. Staging height inclusive of soil test under Khandaghosh Block, District - Purba Bardhaman. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000642/2021-2022 1624/BWD 21/03/2022 12 NATIONAL CONSTRUCTION 472.26 458.19 97.02 1
2377 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED SAGRIA PWSS TO ACCOMMODATE FHTC IN KHANDOGHOSH BLOCK UNDER BURDWAN SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/09492 Augmentation Repairing of dismantling concrete road by Cement Concrete (1:3:6) for Augmentation of KHANDAGHOSH Pipe Water Supply Scheme (Mouza Khandaghosh, Iodna, Barisiali, Kapshit, Nabagram, Metedanga) at Khandaghosh Block of Burdwan Sub-Division under Burdwan Division, PHE Dte. Gr.A. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000364/2022-2023 1403/BSD 10/08/2022 60 JMD ENGINEERING INFRASTRUCTURE COMPANY 4.81 0.00 0 100
2378 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED SAGRIA PWSS TO ACCOMMODATE FHTC IN KHANDOGHOSH BLOCK UNDER BURDWAN SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/09492 Augmentation Material Requisition To Resource Division RTOR000058/2021-2022 561/BWD 27/01/2022 Resource Division 16.61 0.00 0 0
2379 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED SAGRIA PWSS TO ACCOMMODATE FHTC IN KHANDOGHOSH BLOCK UNDER BURDWAN SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/09492 Augmentation Material Requisition To Resource Division RTOR000218/2021-2022 1541/BWD 15/03/2022 Resource Division 0.37 0.00 0 0
2380 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED SAGRIA PWSS TO ACCOMMODATE FHTC IN KHANDOGHOSH BLOCK UNDER BURDWAN SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/09492 Augmentation Material Requisition To Resource Division RTOR000092/2021-2022 931/BWD 16/02/2022 Resource Division 25.87 0.00 0 0
2381 PURBA BARDHAMAN Burdwan Division Augmentation of Kaigram PWSS for providing Functional House Hold Tap Connection (FHTC) , SM/09717 Augmentation Supply of materials for different water supply scheme under Burdwan Division, PHE Dte. VCH/001578/2021-2022 1207/DW 10/03/2022 EXECUTIVE ENGINEER, RESOURCES DIVISION, P.H.E. DTE. 3,005.00 0.00 0 0
2382 PURBA BARDHAMAN Burdwan Division Augmentation of Kaigram PWSS for providing Functional House Hold Tap Connection (FHTC) , SM/09717 Augmentation Preparation of DPR for augmentation of Kaigram W/S Scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. (Sl No- E) Assistant Engineer ORD/000517/2021-2022 185/KSD 21/02/2022 21 LEMNISCATE 2.66 2.66 100 1
2383 PURBA BARDHAMAN Burdwan Division Augmentation of Kaigram PWSS for providing Functional House Hold Tap Connection (FHTC) , SM/09717 Augmentation Material Requisition To Resource Division RTOR000079/2021-2022 605/BWD 28/01/2022 Resource Division 24.12 0.00 0 0
2384 PURBA BARDHAMAN Burdwan Division Augmentation of Kaigram PWSS for providing Functional House Hold Tap Connection (FHTC) , SM/09717 Augmentation Material Requisition To Resource Division RTOR000032/2021-2022 533/BWD 27/01/2022 Resource Division 16.17 0.00 0 0
2385 PURBA BARDHAMAN Burdwan Division Augmentation of Kaigram PWSS for providing Functional House Hold Tap Connection (FHTC) , SM/09717 Augmentation Material Requisition To Resource Division RTOR000106/2021-2022 905/BWD 15/02/2022 Resource Division 12.41 0.00 0 0
2386 PURBA BARDHAMAN Burdwan Division Augmentation of Kaigram PWSS for providing Functional House Hold Tap Connection (FHTC) , SM/09717 Augmentation Material Requisition To Resource Division RTOR000239/2021-2022 1563/BWD 15/03/2022 Resource Division 0.37 0.00 0 0
2387 PURBA BARDHAMAN Burdwan Division Augmentation of Kaigram PWSS for providing Functional House Hold Tap Connection (FHTC) , SM/09717 Augmentation Sinking of 250 X 150mm dia Tube Well 150 mtr. Depth by D.R. Rig method using UPVC pipe (CD) and UPVC Deep Well Screen (RDS) at 1st & 2nd Tubewell site for KAIGRAM Piped Water Supply Scheme, Block - Monteswar, Dist - Purba Bardhaman under Burdwan Division, PHE Dte. [2 Nos. GTW]. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000011/2022-2023 1959/BWD 12/04/2022 45 ACME CONSTRUCTION 14.81 0.00 0 100
2388 PURBA BARDHAMAN Burdwan Division Augmentation of Kaigram PWSS for providing Functional House Hold Tap Connection (FHTC) , SM/09717 Augmentation Augmentation of KAIGRAM Piped Water Supply Scheme with LDS, FHTC, Rising Main, Construction 250 Cum capacity OHR with 20.0 Mtr. Staging height inclusive of soil test & Construction of Boundary wall under Kalna Sub-Division, Block - Monteswar, Dist. - Purba Bardhaman under Burdwan Division, PHE. Dte. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000436/2021-2022 697/BWD 02/02/2022 360 B.B.C. ENTERPRISE 291.40 219.62 75.37 80
2389 PURBA BARDHAMAN Central Mechanical Augmentation of Kaigram PWSS for providing Functional House Hold Tap Connection (FHTC) , SM/09717 Augmentation Quotation for new service connection (Load enhancement) at Kaigram PWSS PH-1. BILL/00462/2024-2025 null 30/07/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 2.53 0.00 0 0
2390 PURBA BARDHAMAN Central Mechanical Augmentation of Kaigram PWSS for providing Functional House Hold Tap Connection (FHTC) , SM/09717 Augmentation Quotation for new service connection (Load enhancement) at Kaigram PWSS PH-2. BILL/00461/2024-2025 null 30/07/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 2.48 0.00 0 0
2391 PURBA BARDHAMAN Central Mechanical Augmentation of Kaigram PWSS for providing Functional House Hold Tap Connection (FHTC) , SM/09717 Augmentation Supply & Installation of Submersible Pumping Machinery , Voltage Stabilizer, Chlorination system and internal House wiring for Tube well no.- 1 & 2 at Augumentation of Kaigram Water Supply Scheme under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000067/2023-2024 2564/CMD 06/06/2023 30 CHOUDHURY ENTERPRISE 20.45 0.00 0 98
2392 PURBA BARDHAMAN Burdwan Division Augmentation of Kaigram PWSS for providing Functional House Hold Tap Connection (FHTC) , SM/09717 Augmentation Work Order for "Constrcution of 1.5 mtrs. Height Boundary Wall along with 750 mm Height 3 layer barbed wire around Other than head work site for Augmentation of Kaigram Piped Water Supply Scheme (SM/09717) within Kalna Sub-Division under Burdwan Division, PHE Dte." Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/001186/2023-2024 2190/KSD 15/03/2024 10 PARTHA PRATIM ACHARYA 4.56 0.00 0 100
2393 PURBA BARDHAMAN Burdwan Division Augmentation of Kaigram PWSS for providing Functional House Hold Tap Connection (FHTC) , SM/09717 Augmentation Work Order for " Renovation of Pump House for Augmentation of Kaigram Piped Water Supply Scheme (SM/09717) under Kalna Sub-Division under Burdwan Division, PHE Dte. (1 no Pump House Repairing)" Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/001193/2023-2024 2203/KSD 18/03/2024 10 PARTHA PRATIM ACHARYA 1.28 0.00 0 100
2394 PURBA BARDHAMAN Burdwan Division Augmentation of Kaigram PWSS for providing Functional House Hold Tap Connection (FHTC) , SM/09717 Augmentation Quotation from WBSEDCL for load enhancement of Kaigram water supply scheme for P.H.-1 & 2 under Burdwan Division, PHE Dte. BILL/00549/2024-2025 732/JJM 27/08/2024 WBSEDCL 5.01 0.00 0 0
2395 PURBA BARDHAMAN Burdwan Division Augmentation of Kaigram PWSS for providing Functional House Hold Tap Connection (FHTC) , SM/09717 Augmentation WSork Order for "-Construction of Toilet (1.8 m x 1.8 m) with saitary arrangement in connection with Augmentation of Kaigram pwss (09717) pwss under Kalna sub division under Burdwan Division. [2 units]." Assistant Engineer ORD/000719/2024-2025 1596/KSD 28/10/2024 30 SUPRIYA RAY 4.91 0.00 0 0
2396 PURBA BARDHAMAN Burdwan Division Augmentation of Kaigram PWSS for providing Functional House Hold Tap Connection (FHTC) , SM/09717 Augmentation Work order for "Protection works for 150 mm dia DI Rising main and to protect Boundary wall at Head works site by UC bullah in connection with Augmentation Kaigram pwss(SM/09717) under Kalna Sub-Division under Burdwan Division P.H.E. Dte." Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000931/2024-2025 1922/KSD 02/12/2024 21 UNIQUE CONSTRUCTION 4.42 0.00 0 100
2397 PURBA BARDHAMAN Burdwan Division Augmentation of Kaigram PWSS for providing Functional House Hold Tap Connection (FHTC) , SM/09717 Augmentation Providing of balance FHTC and other allied works at Brahmapur Mouza under the command area of Kaigram Piped Water Supply Scheme (SM/09717) in order to declare Sajalgram under Mamudpur GP-II under Manteshwar Block under Kalna Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer ORD/000024/2025-2026 1251/BWD 23/04/2025 30 MONDAL & CO. 19.21 0.00 0 0
2398 PURBA BARDHAMAN Burdwan Division Augmentation of Kaigram PWSS for providing Functional House Hold Tap Connection (FHTC) , SM/09717 Augmentation Providing of balance FHTC and other allied works at Kaigram Mouza under the command area of Kaigram Piped Water Supply Scheme (SM/09717) in order to declare Sajalgram under Mamudpur GP-II under Manteshwar Block under Kalna Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer ORD/000020/2025-2026 1247/BWD 23/04/2025 30 MONDAL & CO. 18.95 0.00 0 1
2399 PURBA BARDHAMAN Burdwan Division Augmentation of Kaigram PWSS for providing Functional House Hold Tap Connection (FHTC) , SM/09717 Augmentation Providing of balance FHTC and other allied works at Rautgram Mouza under the command area of Kaigram Piped Water Supply Scheme (SM/09717) in order to declare Sajalgram under Mamudpur GP-II under Manteshwar Block under Kalna Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer ORD/000022/2025-2026 1249/BWD 23/04/2025 30 MONDAL & CO. 28.94 0.00 0 0
2400 PURBA BARDHAMAN Burdwan Division AGUMENTATION OF GROUND WATER BASED SATGACHIA ZONE II PWSS TO ACCOMMODATE FHTC IN MEMARI-II BLOCK UNDER BURDWAN SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/10060 Augmentation Route Survey & Preparation of DPR for Satgachia (Zone-I) & (Zone-II) W/S Scheme under Memari-II Block under Burdwan Sub-Division under Burdwan Division PHE Dte. Sl No.4. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000492/2021-2022 179/BSD 31/01/2022 30 RADIANT 4.21 0.00 0 1
2401 PURBA BARDHAMAN Burdwan Division AGUMENTATION OF GROUND WATER BASED SATGACHIA ZONE II PWSS TO ACCOMMODATE FHTC IN MEMARI-II BLOCK UNDER BURDWAN SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/10060 Augmentation Restoration work due to laying of 160 mm, 140 mm dia HDPE pipe along with Bardhaman Kalna Road from 31.00kmp to 32.00 kmp with sand filling, GSB, WBM & BM and shoulder portion jhama with moorum consolidation of Augmentation of Satgachia Zone-II water supply scheme "JAL JEEVAN MISSION" under Burdwan Division, PHE Dte. BILL/00097/2023-2024 195/JJM 31/05/2023 EXECUTIVE ENGINEER PWD BURDWAN DIVISION 27.42 0.00 0 0
2402 PURBA BARDHAMAN Burdwan Division AGUMENTATION OF GROUND WATER BASED SATGACHIA ZONE II PWSS TO ACCOMMODATE FHTC IN MEMARI-II BLOCK UNDER BURDWAN SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/10060 Augmentation Extension of pipeline & providing Functional Household Tap Connection (350 Nos. FHTC) from existing distribution system within the command are of SATGACHIA Zone - II Piped W/S. Scheme at (Bohar, Jakra, Raibati) Mouza (14 Nos. Habitation) under Memari - II Block under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000005/2023-2024 1681/BWD 10/04/2023 45 G.B. CONSTRUCTION & CO. 39.50 39.47 99.92 100
2403 PURBA BARDHAMAN Burdwan Division AGUMENTATION OF GROUND WATER BASED SATGACHIA ZONE II PWSS TO ACCOMMODATE FHTC IN MEMARI-II BLOCK UNDER BURDWAN SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/10060 Augmentation Replacement of Tube-well & Rising main at HEAD TW site for Aug. of PARHATI, SRIDHARPUR, SATGACHIA ZONE-I, SATGACHIA ZONE-II, Piped Water Supply Scheme within MEMARI-II Block under Burdwan Divn., PHE. Dte. District:- Purba-Bardhaman. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000973/2023-2024 24/BWD 03/01/2024 60 SUSUNIA GP CO. OPERATIVE LABOUR CONTRACT AND CONSTRUCTION SOCIETY LTD. 54.20 0.00 0 90
2404 PURBA BARDHAMAN Burdwan Division AGUMENTATION OF GROUND WATER BASED SATGACHIA ZONE II PWSS TO ACCOMMODATE FHTC IN MEMARI-II BLOCK UNDER BURDWAN SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/10060 Augmentation Relaying of damaged pipeline of 90mm HDPE pipeline for FHTC work & shifiting of sluice valve chamber for Road culvert work from Zilla parisad at Satgachia zone-II Piped Water Supply Scheme within Memari-II block under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000510/2024-2025 1857/BSD 22/08/2024 30 D.M. ENTERPRISE 0.93 0.00 0 100
2405 PURBA BARDHAMAN Burdwan Division AGUMENTATION OF GROUND WATER BASED SATGACHIA ZONE II PWSS TO ACCOMMODATE FHTC IN MEMARI-II BLOCK UNDER BURDWAN SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/10060 Augmentation Repairing damaged Pipeline & concrete road by Cement concrete (mix 1:1.5:3) and drainage system, Sluice valve chamber for FHTC work for SATGACHIA ZONE-I, SATGACHIA ZONE-II, SRIDHARPUR, PARHATI, KUCHUT, NOAHATI, MONDALGRAM PWSS and its adjoining mouzas within MEMARI-II BLOCK under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000283/2024-2025 2715/BWD 11/07/2024 205 A.R. TRADERS 74.28 0.00 0 30
2406 PURBA BARDHAMAN Burdwan Division AGUMENTATION OF GROUND WATER BASED SATGACHIA ZONE II PWSS TO ACCOMMODATE FHTC IN MEMARI-II BLOCK UNDER BURDWAN SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/10060 Augmentation Augmentation of SATGACHIA (Zone-II) Piped Water Supply Scheme with LDS, FHTC, Rising Main, Construction of 400 Cum capacity OHR with 20.0 Mtr. Staging height inclusive of soil investigation under Memari ¿ II Block, District - Purba Bardhaman. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000005/2022-2023 1900/BWD 07/04/2022 1031 G.B. CONSTRUCTION & CO. 391.54 321.65 82.15 100
2407 PURBA BARDHAMAN Burdwan Division AGUMENTATION OF GROUND WATER BASED SATGACHIA ZONE II PWSS TO ACCOMMODATE FHTC IN MEMARI-II BLOCK UNDER BURDWAN SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/10060 Augmentation Different Types of work involved in connection with different Augmentation & Retrofitting Schemes (06 Nos.) Piped Water Supply Scheme under Memari II Block within Burdwan Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/001269/2024-2025 848/BWD 05/03/2025 120 PROJECT INDIA 394.29 0.00 0 0
2408 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED HATKALNA PWSS TO ACCOMMODATE FHTC IN KALNA I BLOCK UNDER KALNA SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/10337 Augmentation Preparation of DPR for augmentation of Hatkalna W/S Scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. (Sl No-C) Assistant Engineer ORD/000610/2021-2022 269/KSD 15/03/2022 21 ROY CHOWDHURY ASSOCIATES 3.23 3.22 99.69 1
2409 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED HATKALNA PWSS TO ACCOMMODATE FHTC IN KALNA I BLOCK UNDER KALNA SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/10337 Augmentation Sinking of Tube well 250 x 200 mm dia Tube well 150 mtr depth by D.R. Rig method using UPVC pipe (CD) and fibre glass strainer for HATKALNA piped water supply scheme (2nd tube well site), Block-Kalna-I, Dist.-Purba Bardhaman, under Burdwan Division, PHE Dte. Assistant Engineer ORD/000962/2020-2021 1492/BWD 18/02/2021 30 C.M. ENTERPRISE 8.68 8.06 92.86 1
2410 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED HATKALNA PWSS TO ACCOMMODATE FHTC IN KALNA I BLOCK UNDER KALNA SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/10337 Augmentation Sinking of 250 X 150mm dia Tube Well 150 mtr. Depth by D.R. Rig method using UPVC pipe (CM) and UPVC Medium Well Screen (RMS) for 2nd TW Site of Aug. HATKALNA & its adjoining mouzas Piped Water Supply Scheme, Block ¿ Kalna ¿ I, Dist - Purba Bardhaman under Burdwan Division, PHE Dte. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000699/2022-2023 605/BWD 17/02/2023 30 AUXILIARY TUBE WELL DRILLERS 8.64 8.44 97.69 1
2411 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED HATKALNA PWSS TO ACCOMMODATE FHTC IN KALNA I BLOCK UNDER KALNA SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/10337 Augmentation Material Requisition To Resource Division RTOR000013/2022-2023 3279/BWD 29/07/2022 Resource Division 52.80 0.00 0 0
2412 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED HATKALNA PWSS TO ACCOMMODATE FHTC IN KALNA I BLOCK UNDER KALNA SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/10337 Augmentation Additional work viz. Carriage of different type of departmental pipes and Interconnection of Tube well and existing pipe line and Restoration of existing concrete road and laying of pipeline of HATKALNA Water Supply Scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000969/2023-2024 003/BWD 02/01/2024 120 S.P. CONSTRUCTION 162.05 0.00 0 100
2413 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED HATKALNA PWSS TO ACCOMMODATE FHTC IN KALNA I BLOCK UNDER KALNA SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/10337 Augmentation Sinking of 250 X 150mm dia Tube Well 150 mtr. Depth by D.R. Rig method using UPVC pipe (CD) and UPVC Deep Well Screen (RDS) for 3RD TW Site of Aug. HATKALNA & its adjoining mouzas Piped Water Supply Scheme, Block ¿ Kalna ¿ I, Dist - Purba Bardhaman under Burdwan Division, PHE Dte. [For 01 No. Tube well]. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000218/2023-2024 2711/BWD 08/06/2023 30 AUXILIARY TUBE WELL DRILLERS 9.89 0.00 0 90
2414 PURBA BARDHAMAN Central Mechanical AUGMENTATION OF GROUND WATER BASED HATKALNA PWSS TO ACCOMMODATE FHTC IN KALNA I BLOCK UNDER KALNA SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/10337 Augmentation Supply & Installation of Chlorination System for Tube well No.-1 at Hat Kalna Water Supply Scheme under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/001866/2023-2024 464/CMSD 21/03/2024 12 JOYGURU ENTERPRISE 0.96 0.00 0 100
2415 PURBA BARDHAMAN Central Mechanical AUGMENTATION OF GROUND WATER BASED HATKALNA PWSS TO ACCOMMODATE FHTC IN KALNA I BLOCK UNDER KALNA SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/10337 Augmentation Supply & Installation of Chlorination System for Tube well No.-2 at Hat Kalna Water Supply Scheme under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/001847/2023-2024 377/CMSD 29/02/2024 15 SUDIKSHA CONSTRUCTION 0.96 0.00 0 100
2416 PURBA BARDHAMAN Central Mechanical AUGMENTATION OF GROUND WATER BASED HATKALNA PWSS TO ACCOMMODATE FHTC IN KALNA I BLOCK UNDER KALNA SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/10337 Augmentation QUOTATION FOR NEW SERVICE CONNECTION AT AUGMENTATION OF HAT KALNA PWSS TW 3, BLOCK KALNA-1 BILL/00727/2024-2025 BP-2024-25-285 10/09/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 6.36 0.00 0 0
2417 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED HATKALNA PWSS TO ACCOMMODATE FHTC IN KALNA I BLOCK UNDER KALNA SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/10337 Augmentation Digital structurization of pipeline alignment and asset evaluation including holistic design, preparation of design drawings of overall LDS & preparation of estimate for 11 Nos. Piped W/S. Schemes under Kalna I Block under Kalna Sub-Division under Burdwan Division, PHE. Dte. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000335/2024-2025 3015/BWD 05/08/2024 60 HORIZEN 29.60 0.00 0 10
2418 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED HATKALNA PWSS TO ACCOMMODATE FHTC IN KALNA I BLOCK UNDER KALNA SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/10337 Augmentation Construction of 1.5 Mtr. height boundary wall along with 750 mm. height 3 layer barbed wire and other ancillary works at Head Work Site in connection with Augmentation of Hatkalna PWSS (SM/10337) Piped Water Supply Scheme within Kalna Sub Division under Burdwan Divn., PHE. Dte. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000813/2024-2025 4067/BWD 21/11/2024 30 UJJWAL MUKHERJEE 20.99 0.00 0 0
2419 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED HATKALNA PWSS TO ACCOMMODATE FHTC IN KALNA I BLOCK UNDER KALNA SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/10337 Augmentation Work Order for "Constrcution of 1.5 mtrs. Height Boundary Wall along with 750 mm Height 3 layer barbed wire in connection with Augmentation of Hatkalna PWSS ( SM/10337) Piped water supply scheme within Kalna Sub-Division under Burdwan Division, PHE Dte." Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000798/2024-2025 1767/KSD 20/11/2024 30 S.B.S. ENTERPRISE 3.35 2.89 86.27 2
2420 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED HATKALNA PWSS TO ACCOMMODATE FHTC IN KALNA I BLOCK UNDER KALNA SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/10337 Augmentation Renovation of Pump House in connection with Augmentation of Hatkalna piped Water supply (SM/10337) Scheme under Kalna Sub-Division under Burdwan Division, PHE Dte. (2 units) Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000746/2024-2025 3747/BWD 29/10/2024 30 S.B.S. ENTERPRISE 9.70 5.68 58.56 100
2421 PURBA BARDHAMAN Central Mechanical AUGMENTATION OF GROUND WATER BASED HATKALNA PWSS TO ACCOMMODATE FHTC IN KALNA I BLOCK UNDER KALNA SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/10337 Augmentation Supply & Installation of Submersible Pumping Machinery , Voltage Stabilizer, Chlorination system and internal House wiring of Tube Well No- 01,02 03 & 04 at Augmentation Hatkalna [Block -Kalna-I] Water Supply Scheme under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER Junior Engineer ORD/000916/2022-2023 1080/CMD 03/03/2023 820 P.K. ENGINEERING 41.64 0.00 0 35
2422 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED HATKALNA PWSS TO ACCOMMODATE FHTC IN KALNA I BLOCK UNDER KALNA SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/10337 Augmentation Augmentation of Hatkalna Piped Water Supply Scheme with LDS, FHTC, Construction of 1000 cum capacity OHR with 20.0 mtr. with Staging height including soil investigation & construction of switch-rooms & boundary walls at different TW site & repairing of switch rooms under Kalna-I Block, District:- Purba-Bardhaman. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000536/2022-2023 5019/BWD 10/11/2022 1057 S.P. CONSTRUCTION 976.48 725.99 74.35 50
2423 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED HATKALNA PWSS TO ACCOMMODATE FHTC IN KALNA I BLOCK UNDER KALNA SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/10337 Augmentation Work Order for "Constrcution of 1.5 mtrs. Height Boundary Wall along with 750 mm Height 3 layer barbed wire around Other than head work site for Hatkalna Piped Water Supply Scheme (SM/10337) within Kalna Sub-Division under Burdwan Division, PHE Dte." Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/001185/2023-2024 2188/KSD 15/03/2024 130 BISWAS ENTERPRISE 4.59 0.00 0 100
2424 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED HATKALNA PWSS TO ACCOMMODATE FHTC IN KALNA I BLOCK UNDER KALNA SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/10337 Augmentation Construction of switch rooms & Rising main at different TW site for Hatkalna Piped Water Supply Scheme under Kalna - I Block, District:- Purba-Bardhaman under Burdwan Division, PHE. Dte. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000757/2023-2024 4736/BWD 03/11/2023 422 BISWAS ENTERPRISE 8.38 0.00 0 100
2425 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED HATKALNA PWSS TO ACCOMMODATE FHTC IN KALNA I BLOCK UNDER KALNA SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/10337 Augmentation Work Order for "Construction of Toilet (1.8 m x 1.8 m) with saitary arrangement in connection with Augmentation of Hatkalna pwss (SM/10337) under Kalna sub division under Burdwan Division." Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000796/2024-2025 1766/KSD 20/11/2024 30 S.B.S. ENTERPRISE 4.91 0.00 0 100
2426 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting at Palasan PWSS , SM/06772 Retrofitting Providing Functional Household tap connection (FHTC) from existing distribution system within the command area of PALASON piped water supply scheme at Raina-I Block under Burdwan Division, PHE Dte._2nd call. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000678/2020-2021 1409/BWD 18/02/2021 60 S.S. ENTERPRISE 72.41 51.75 71.47 1
2427 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting at Palasan PWSS , SM/06772 Retrofitting Interconnection between Raising Main to OHR & OHR to distribution System with bypass arrangement for Palason Water Supply Scheme within Raina-I Block under Burdwan Division, PHE Dte._2ND CALL Gr.E. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000467/2021-2022 278/BSD 15/02/2022 30 S.S. ENTERPRISE 3.23 0.00 0 1
2428 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting at Palasan PWSS , SM/06772 Retrofitting Construction of concrete road and rest portion of Boundary Wall at Head Works Site of PALASON Water Supply Scheme under Raina-I Block of Burdwan Division,PHE Dte(Length-48.00 Mtr,Col-16 Nos)[Front Side]Gr.F. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000490/2021-2022 279/BSD 15/02/2022 45 NEW MANGES INDUSTRIAL CORPORATION 4.12 4.17 101.21 1
2429 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting at Palasan PWSS , SM/06772 Retrofitting Conducting physical Household Survey at the IMIS reported village for HGJ certification and providing balance FHTC for Har Ghar Jal certification including conducting Gram Sabhas for different IMIS reported villages across the district under Burdwan Division, PHE Dte. AE(HQs),Assistant Engineer ,Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE.,Assistant Engineer, Durgapur Sub Division, P.H.E. Dte JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000428/2024-2025 3107/BWD 12/08/2024 90 TUBGRAM GRAMMYAK UNNAYAN SAMITY 309.60 0.00 0 50
2430 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED PIPED WATER SUPPLY SCHEME FOR BONPAS KAMARPARA TO ACCOMMODATE FHTC UNDER BHATAR BLOCK IN PURBA BARDHAMAN DISTRICT UNDER BURDWAN DIVISION PHE DTE , SM/10391 Augmentation Construction of 600 cum capacity 20 mtr staging height RCC Over Head Reservoir including pipe connection and cost of pipes, specials for Bonpass-Kamarpara & its adjoining mouzas water supply scheme under Burdwan Division, PHE Dte. Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000727/2021-2022 3655/BWD 14/07/2021 180 ASHOK MITRA 107.00 0.00 0 1
2431 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED PIPED WATER SUPPLY SCHEME FOR BONPAS KAMARPARA TO ACCOMMODATE FHTC UNDER BHATAR BLOCK IN PURBA BARDHAMAN DISTRICT UNDER BURDWAN DIVISION PHE DTE , SM/10391 Augmentation Sinking of additional 300 X 200mm dia Tube Well 200 mtr. Depth by D.R. Rig method using UPVC pipe (CD) and UPVC Deep Well Screen (RDS) at 4th & 5th Tube well Site for Augmentation of BONPAS-KAMARPARA Piped Water Supply Scheme, Block - Bhatar, Dist - Purba Bardhaman under Burdwan Division, PHE Dte. [2 Nos. GTW]. Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000141/2022-2023 3031/BWD 07/07/2022 45 B.K. ENTERPRISE 28.13 0.00 0 1
2432 PURBA BARDHAMAN Central Mechanical AUGMENTATION OF GROUND WATER BASED PIPED WATER SUPPLY SCHEME FOR BONPAS KAMARPARA TO ACCOMMODATE FHTC UNDER BHATAR BLOCK IN PURBA BARDHAMAN DISTRICT UNDER BURDWAN DIVISION PHE DTE , SM/10391 Augmentation Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination system and internal House wiring for Tube well no.- 4 at BonpassKamarpara Water Supply Scheme under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000764/2022-2023 3328/CMD 12/12/2022 30 P.K. ENGINEERING 10.06 9.65 95.92 80
2433 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED PIPED WATER SUPPLY SCHEME FOR BONPAS KAMARPARA TO ACCOMMODATE FHTC UNDER BHATAR BLOCK IN PURBA BARDHAMAN DISTRICT UNDER BURDWAN DIVISION PHE DTE , SM/10391 Augmentation Augmentation of BANPAS Piped Water Supply Scheme (Dhandalsa Mouza) with LDS & FHTC and construction of Pump House at 4th TW site under Bhatar Block, District:- Purba-Burdwan under Burdwan Division, PHE. Dte. [PART-F]. Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000716/2022-2023 891/BWD 01/03/2023 60 DEY NIRMAN 71.08 71.08 100 100
2434 PURBA BARDHAMAN Central Mechanical AUGMENTATION OF GROUND WATER BASED PIPED WATER SUPPLY SCHEME FOR BONPAS KAMARPARA TO ACCOMMODATE FHTC UNDER BHATAR BLOCK IN PURBA BARDHAMAN DISTRICT UNDER BURDWAN DIVISION PHE DTE , SM/10391 Augmentation Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination system and internal House wiring for Tube well no.- 5 at BonpassKamarpara Water Supply Scheme under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000765/2022-2023 3329/CMD 12/12/2022 30 CHOUDHURY ENTERPRISE 10.09 9.82 97.32 100
2435 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED PIPED WATER SUPPLY SCHEME FOR BONPAS KAMARPARA TO ACCOMMODATE FHTC UNDER BHATAR BLOCK IN PURBA BARDHAMAN DISTRICT UNDER BURDWAN DIVISION PHE DTE , SM/10391 Augmentation Augmentation of BANPAS Piped Water Supply Scheme (Mohanpur Mouza) with LDS & FHTC under Bhatar Block, District:- Purba-Burdwan under Burdwan Division, PHE. Dte. [PART-C]. Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer2, Durgapur Sub-Division, PHE Dte. ORD/000713/2022-2023 888/BWD 01/03/2023 60 KOUSIK MALLICK 104.59 59.02 56.43 100
2436 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED PIPED WATER SUPPLY SCHEME FOR BONPAS KAMARPARA TO ACCOMMODATE FHTC UNDER BHATAR BLOCK IN PURBA BARDHAMAN DISTRICT UNDER BURDWAN DIVISION PHE DTE , SM/10391 Augmentation Augmentation of BANPAS Piped Water Supply Scheme (Narayanpur Mouza) with LDS, FHTC and Construction of Pump House at 4th TW site under Bhatar Block, District:- Purba-Burdwan under Burdwan Division, PHE. Dte. [PART-D]. Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000728/2022-2023 1029/BWD 09/03/2023 60 SARKAR AGENCY 111.93 89.43 79.9 100
2437 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED PIPED WATER SUPPLY SCHEME FOR BONPAS KAMARPARA TO ACCOMMODATE FHTC UNDER BHATAR BLOCK IN PURBA BARDHAMAN DISTRICT UNDER BURDWAN DIVISION PHE DTE , SM/10391 Augmentation Augmentation of BANPAS KAMARPARA Piped Water Supply Scheme (Ambana Mouza) with LDS, FHTC and Construction of Pump House at 4th TW site under Bhatar Block, District:- Purba-Burdwan under Burdwan Division, PHE. Dte. [PART-B]. Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer2, Durgapur Sub-Division, PHE Dte. ORD/000102/2023-2024 2261/BWD 18/05/2023 60 M/S K.P. CONSTRUCTION 91.92 49.19 53.51 100
2438 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED PIPED WATER SUPPLY SCHEME FOR BONPAS KAMARPARA TO ACCOMMODATE FHTC UNDER BHATAR BLOCK IN PURBA BARDHAMAN DISTRICT UNDER BURDWAN DIVISION PHE DTE , SM/10391 Augmentation Repairing of Switch room cum chlorine room with sanitary and water supply arrangement (P.H-2) at 2nd Tubewell Site for Bonpas-Kamarpara and its adjoining mouza's water supply scheme under Durgapur Sub-Division, P.H.E Dte. Block:-Bhatar, Dist:Purba Bardhaman. [Gr.-F] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer2, Durgapur Sub-Division, PHE Dte. ORD/000274/2022-2023 499/DSD 12/08/2022 30 SUPRIYA RAY 2.03 0.00 0 100
2439 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED PIPED WATER SUPPLY SCHEME FOR BONPAS KAMARPARA TO ACCOMMODATE FHTC UNDER BHATAR BLOCK IN PURBA BARDHAMAN DISTRICT UNDER BURDWAN DIVISION PHE DTE , SM/10391 Augmentation Augmentation of BANPAS KAMARPARA Piped Water Supply Scheme (Haribati & Chandai Mouza) with LDS & FHTC within Bhatar Block, District:- Purba-Burdwan under Burdwan Division, PHE. Dte. [PART-E]. Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer2, Durgapur Sub-Division, PHE Dte. ORD/000103/2023-2024 2262/BWD 18/05/2023 60 M/S K.P. CONSTRUCTION 80.02 24.51 30.63 80
2440 PURBA BARDHAMAN Central Mechanical AUGMENTATION OF GROUND WATER BASED PIPED WATER SUPPLY SCHEME FOR BONPAS KAMARPARA TO ACCOMMODATE FHTC UNDER BHATAR BLOCK IN PURBA BARDHAMAN DISTRICT UNDER BURDWAN DIVISION PHE DTE , SM/10391 Augmentation Illumination arrangement and miscelleneous works at Bonpas Kamarpara water supply scheme under Bhatar Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000406/2024-2025 2785/CMD 01/10/2024 60 CINZANO 14.08 0.00 0 0
2441 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED PIPED WATER SUPPLY SCHEME FOR BONPAS KAMARPARA TO ACCOMMODATE FHTC UNDER BHATAR BLOCK IN PURBA BARDHAMAN DISTRICT UNDER BURDWAN DIVISION PHE DTE , SM/10391 Augmentation Augmentation of BONPAS KAMARPARA Piped Water Supply Scheme (Banpas Mouza) with LDS, Rising main, FHTC and construction of Boundary wall for existing TW site under Bhatar Block, District:- Purba-Burdwan. (PART - A) Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer2, Durgapur Sub-Division, PHE Dte. ORD/000376/2023-2024 3110/BWD 19/07/2023 120 R.G. INFRASTRUCTURE 389.91 69.45 17.81 80
2442 PURBA BARDHAMAN Burdwan Division Extension of PWS to Anganwadi Centers (AWCs) located within the command area of PWSS under Burdwan Division. , SM/10016 Anganwadi Providing necessary water supply arrangement at 58 Nos Anganwari Centre having Electric Power connection within the command area of Memari-I Block under Burdwan Division, PHE Dte. [Part-C] Assistant Engineer,Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE.,Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000536/2021-2022 3203/BWD 09/06/2021 30 G.S. CONSTRUCTION & CO. 27.75 26.07 93.95 1
2443 PURBA BARDHAMAN Burdwan Division Extension of PWS to Anganwadi Centers (AWCs) located within the command area of PWSS under Burdwan Division. , SM/10016 Anganwadi Providing necessary water supply arrangement at 50 (Fifty) Nos. Anganwadi Center having Electric Power connection within the command area of Memari - I Block under Burdwan Division, P.H.E. Dte. (Part - B). Assistant Engineer,Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE.,Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000019/2021-2022 3299/BWD 15/06/2021 30 JAGADANANDAPUR CO. OP. LABOUR CONTRACT AND CONSTRUCTION SOCIETY LTD. 23.93 20.97 87.63 1
2444 PURBA BARDHAMAN Burdwan Division Extension of PWS to Anganwadi Centers (AWCs) located within the command area of PWSS under Burdwan Division. , SM/10016 Anganwadi Providing necessary water supply arrangement at 50 (Fifty) Nos. Anganwadi Center having Electric Power connection within the command area of Memari - I Block under Burdwan Division, P.H.E. Dte. (Part - A). Assistant Engineer ,Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE.,Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000021/2021-2022 3334/BWD 18/06/2021 30 BRINDABAN KONAR 23.90 20.74 86.78 1
2445 PURBA BARDHAMAN Burdwan Division Extension of PWS to Anganwadi Centers (AWCs) located within the command area of PWSS under Burdwan Division. , SM/10016 Anganwadi Providing necessary water supply arrangement at 50 (Fifty) Nos. Anganwadi Center having Electric Power connection within the command area of Katwa - I Block (22 Nos.) & Katwa - II Block (28 Nos.) under Burdwan Division, P.H.E. Dte. Assistant Engineer ,Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE.,Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000025/2021-2022 3344/BWD 21/06/2021 30 TAPAS KUMAR ROY 23.88 13.32 55.78 1
2446 PURBA BARDHAMAN Burdwan Division Extension of PWS to Anganwadi Centers (AWCs) located within the command area of PWSS under Burdwan Division. , SM/10016 Anganwadi Providing necessary water supply arrangement at 36 (Thirty Six) Nos. Anganwadi Center having Electric Power connection within the command area of Monteswar Block (17 Nos.) & Mongalkote Block (19 Nos.) under Burdwan Division, P.H.E. Dte. Assistant Engineer ,Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE.,Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000127/2021-2022 4552/BWD 06/09/2021 30 ASMA ENTERPRISE 17.18 12.92 75.2 1
2447 PURBA BARDHAMAN Burdwan Division Extension of PWS to Anganwadi Centers (AWCs) located within the command area of PWSS under Burdwan Division. , SM/10016 Anganwadi Providing necessary water supply arrangement at 69 (Sixty Nine) Nos. Anganwadi Center having no Electric Power connection within the command area of Ausgram - I Block under Burdwan Division, P.H.E. Dte. Assistant Engineer ,Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE.,Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000362/2021-2022 107/BWD 06/01/2022 30 DUBE ENTERPRISE 27.96 26.20 93.71 1
2448 PURBA BARDHAMAN Burdwan Division Extension of PWS to Anganwadi Centers (AWCs) located within the command area of PWSS under Burdwan Division. , SM/10016 Anganwadi Providing necessary water supply arrangement at 42 (Forty Two) Nos. Anganwadi Center having Electric Power connection within the command area of Memari - II Block under Burdwan Division, P.H.E. Dte. (Part - A). Assistant Engineer,Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE.,Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000135/2021-2022 4550/BWD 06/09/2021 30 SETH ENTERPRISE 17.71 5.48 30.94 1
2449 PURBA BARDHAMAN Burdwan Division Extension of PWS to Anganwadi Centers (AWCs) located within the command area of PWSS under Burdwan Division. , SM/10016 Anganwadi Providing necessary water supply arrangement at 58 (Fifty Eight) Nos. Anganwadi Center having no Electric Power connection within the command area of Ausgram - II Block under Burdwan Division, P.H.E. Dte. (Part-A). Assistant Engineer,Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE.,Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000361/2021-2022 106/BWD 06/01/2022 30 ANWESHA CONSTRUCTION 23.05 21.89 94.97 1
2450 PURBA BARDHAMAN Burdwan Division Extension of PWS to Anganwadi Centers (AWCs) located within the command area of PWSS under Burdwan Division. , SM/10016 Anganwadi Providing necessary water supply arrangement at 30 (Thirty) Nos. Anganwadi Center having no Electric Power connection within the command area of Bhatar Block under Burdwan Division, P.H.E. Dte. Assistant Engineer,Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE.,Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000374/2021-2022 212/BWD 11/01/2022 30 BAMDEB CONSTRUCTION & CO 12.29 10.27 83.56 1
2451 PURBA BARDHAMAN Burdwan Division Extension of PWS to Anganwadi Centers (AWCs) located within the command area of PWSS under Burdwan Division. , SM/10016 Anganwadi Providing necessary water supply arrangement at 57 (Fifty Seven) Nos. Anganwadi Center having no Electric Power connection within the command area of Ausgram - II Block under Burdwan Division, P.H.E. Dte. (Part-B). Assistant Engineer,Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE.,Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000403/2021-2022 281/BWD 17/01/2022 30 RELIABLE ENGINEERS CO.-OPERATIVE CONSTRUCTION SOCIETY LTD. 23.46 16.25 69.27 1
2452 PURBA BARDHAMAN Burdwan Division Extension of PWS to Anganwadi Centers (AWCs) located within the command area of PWSS under Burdwan Division. , SM/10016 Anganwadi Providing necessary water supply arrangement at 54 (Fifty Four) Nos. Anganwadi Center having Electric Power connection within the command area of Jamalpur Block under Burdwan Division, P.H.E. Dte. (Part-B). Assistant Engineer ,Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE.,Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000134/2021-2022 4544/BWD 06/09/2021 30 KOUSIK MALLICK 25.88 19.21 74.23 1
2453 PURBA BARDHAMAN Burdwan Division Extension of PWS to Anganwadi Centers (AWCs) located within the command area of PWSS under Burdwan Division. , SM/10016 Anganwadi Providing necessary water supply arrangement at 54 (Fifty Four) Nos. Anganwadi Center having no Electric Power connection within the command area of Jamalpur Block under Burdwan Division, P.H.E. Dte. (Part-A). Assistant Engineer ,Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE.,Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000343/2021-2022 38/BWD 05/01/2022 30 HAFIJUR RAHAMAN MIDYA 22.10 15.58 70.5 1
2454 PURBA BARDHAMAN Burdwan Division Extension of PWS to Anganwadi Centers (AWCs) located within the command area of PWSS under Burdwan Division. , SM/10016 Anganwadi Providing necessary water supply arrangement at 51 (Fifty One) Nos. Anganwadi Center having Electric Power connection within the command area of Galsi - I Block under Burdwan Division, P.H.E. Dte. Assistant Engineer,Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE.,Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000787/2021-2022 4545./BWD 06/09/2021 30 SHUBHRA KANTI GHOSH 24.42 15.45 63.27 1
2455 PURBA BARDHAMAN Burdwan Division Extension of PWS to Anganwadi Centers (AWCs) located within the command area of PWSS under Burdwan Division. , SM/10016 Anganwadi Providing necessary water supply arrangement at 18 (Eighteen) Nos. Anganwadi Center having Electric Power connection within the command area of Khandaghosh Block under Burdwan Division, P.H.E. Dte. Assistant Engineer,Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE.,Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000128/2021-2022 4546/BWD 06/09/2021 30 SHUBHRA KANTI GHOSH 8.62 5.42 62.88 1
2456 PURBA BARDHAMAN Burdwan Division Extension of PWS to Anganwadi Centers (AWCs) located within the command area of PWSS under Burdwan Division. , SM/10016 Anganwadi Providing necessary water supply arrangement at 53 (Fifty Three) Nos. Anganwadi Center having no Electric Power connection within the command area of Purbasthali - I Block (36 Nos.) & Purbasthali - II Block (17 Nos.) under Burdwan Division, P.H.E. Dte. Assistant Engineer,Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE.,Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000447/2021-2022 754/BWD 07/02/2022 30 BIPLAB GUHA 21.61 18.34 84.87 1
2457 PURBA BARDHAMAN Burdwan Division Extension of PWS to Anganwadi Centers (AWCs) located within the command area of PWSS under Burdwan Division. , SM/10016 Anganwadi Providing necessary water supply arrangement at 20 (Twenty) Nos. Anganwadi Center having Electric Power connection within the command area of Kalna - I Block (09 Nos.) & Kalna - II Block (11 Nos.) under Burdwan Division, P.H.E. Dte. Assistant Engineer,Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE.,Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000136/2021-2022 4549/BWD 06/09/2021 30 YOUNG ENGINEERS CO.-OPERATIVE SOCIETY LTD. 8.53 6.02 70.57 1
2458 PURBA BARDHAMAN Burdwan Division Extension of PWS to Anganwadi Centers (AWCs) located within the command area of PWSS under Burdwan Division. , SM/10016 Anganwadi Providing necessary water supply arrangement at 20 (Twenty) Nos. Anganwadi Center having no Electric Power connection within the command area of Galsi - II Block under Burdwan Division, P.H.E. Dte. Assistant Engineer,Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE.,Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000404/2021-2022 282/BWD 17/01/2022 30 J. K. CORPORATION 8.11 7.94 97.9 1
2459 PURBA BARDHAMAN Burdwan Division Extension of PWS to Anganwadi Centers (AWCs) located within the command area of PWSS under Burdwan Division. , SM/10016 Anganwadi Providing necessary water supply arrangement at 55 (Fifty Five) Nos. Anganwadi Center having no Electric Power connection within the command area of Raina - II Block under Burdwan Division, P.H.E. Dte. Assistant Engineer,Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE.,Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000357/2021-2022 69/BWD 06/01/2022 30 PREMANANDA ROY BISWAS 22.28 18.61 83.53 1
2460 PURBA BARDHAMAN Burdwan Division Extension of PWS to Anganwadi Centers (AWCs) located within the command area of PWSS under Burdwan Division. , SM/10016 Anganwadi Providing necessary water supply arrangement at 14 (Fourteen) Nos. Anganwadi Center having no Electric Power connection within the command area of Burdwan - I Block (04 Nos.) & Burdwan - II Block (10 Nos.) under Burdwan Division, P.H.E. Dte._2ND CALL. Assistant Engineer,Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE.,Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000025/2022-2023 2035/BWD 19/04/2022 30 GOUTAM KUMAR MITRA 5.73 4.64 80.98 1
2461 PURBA BARDHAMAN Burdwan Division Extension of PWS to Anganwadi Centers (AWCs) located within the command area of PWSS under Burdwan Division. , SM/10016 Anganwadi Providing necessary water supply arrangement at 24 (Twenty Four) Nos. Anganwadi Center having Electric Power connection within the command area of Raina - I Block under Burdwan Division, P.H.E. Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000133/2021-2022 4547/BWD 06/09/2021 30 BARDHAMAN AQUA ENGINEERING 11.29 7.43 65.81 100
2462 PURBA BARDHAMAN Burdwan Division Extension of PWS to Anganwadi Centers (AWCs) located within the command area of PWSS under Burdwan Division. , SM/10016 Anganwadi Providing necessary water supply arrangement at 42 (Forty Two) Nos. Anganwadi Center having Electric Power connection within the command area of Memari - II Block under Burdwan Division, P.H.E. Dte. (Part - B). Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER RWS BURDWAN SUB-DIVISION PHE DTE ORD/000130/2021-2022 4548/BWD 06/09/2021 30 BARDHAMAN AQUA ENGINEERING 19.71 11.70 59.36 100
2463 PURBA BARDHAMAN Burdwan Division Laying of pipe line (parallel to the main line) of the existing Distribution System and providing Functional Household Tap connection (FHTC) from existing distribution system within the command area of Srikhanda PWSS at Katwa-I block under Burdwan divisio , SM/12116 Augmentation Laying of pipe line (Parallel to the main line) of the existing Distribution System and Providing Functional Household Tap Connection(FHTC) from existing distribution system within the command area of SRIKHANDA Piped Water Supply Scheme at Katwa-I Block under Burdwan Division, PHE Dte. Assistant Engineer ORD/000023/2022-2023 2027/BWD 18/04/2022 30 M/S JOY 53.12 47.76 89.91 1
2464 PURBA BARDHAMAN Burdwan Division Laying of pipe line (parallel to the main line) of the existing Distribution System and providing Functional Household Tap connection (FHTC) from existing distribution system within the command area of Srikhanda PWSS at Katwa-I block under Burdwan divisio , SM/12116 Augmentation Balance work of OHR, construction Concrete Road, Functional Household Tap Connection, Road restoration etc. for Nanagar PWSS, Srikhanda PWSS, under KATWA -I Block under Katwa Sub-Divn under Burdwan Division, PHE Dte. District:- Purba-Bardhaman. Assistant Engineer ORD/000685/2024-2025 3655/BWD 21/10/2024 120 HAMID SK 121.69 0.00 0 0
2465 PURBA BARDHAMAN Bhatar,Mangolkote Burdwan Division DEBPUR PIPED WATER SUPPLY SCHEME , SM/13398 New Material Requisition To Resource Division RTOR000087/2023-2024 1962/BWD 25/04/2023 Resource Division 21.04 0.00 0 0
2466 PURBA BARDHAMAN Bhatar,Mangolkote Burdwan Division DEBPUR PIPED WATER SUPPLY SCHEME , SM/13398 New Material Requisition To Resource Division RTOR000173/2023-2024 2155/BWD 10/05/2023 Resource Division 20.38 0.00 0 0
2467 PURBA BARDHAMAN Bhatar,Mangolkote Central Mechanical DEBPUR PIPED WATER SUPPLY SCHEME , SM/13398 New New service connection charges for Debpur PWSS TW-1 BILL/01419/2023-2024 BP-2023-24-146 31/08/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 9.73 0.00 0 0
2468 PURBA BARDHAMAN Bhatar,Mangolkote Burdwan Division DEBPUR PIPED WATER SUPPLY SCHEME , SM/13398 New Material Requisition To Resource Division RTOR000640/2023-2024 5106/BWD 23/11/2023 Resource Division 20.32 0.00 0 0
2469 PURBA BARDHAMAN Bhatar,Mangolkote Central Mechanical DEBPUR PIPED WATER SUPPLY SCHEME , SM/13398 New New service connection charges for Debpur PWSS TW-2 BILL/01673/2023-2024 BP-2023-24-224 10/11/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 5.53 0.00 0 0
2470 PURBA BARDHAMAN Bhatar,Mangolkote Central Mechanical DEBPUR PIPED WATER SUPPLY SCHEME , SM/13398 New SUPPLY AND INSTALLATION WORKS FOR DEBPUR PWSS BILL/02624/2023-2024 BP-2023-24-557 21/02/2024 P.K. ENGINEERING 11.09 0.00 0 0
2471 PURBA BARDHAMAN Bhatar,Mangolkote Central Mechanical DEBPUR PIPED WATER SUPPLY SCHEME , SM/13398 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at Debpur Water Supply Scheme [ Block- Bhatar ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000232/2023-2024 3174/CMD 26/07/2023 30 P.K. ENGINEERING 27.69 0.00 0 95
2472 PURBA BARDHAMAN Bhatar,Mangolkote Burdwan Division DEBPUR PIPED WATER SUPPLY SCHEME , SM/13398 New Continuation order for Supply of 01(one) No. Diesel Driven Motor Cab (Bharat Stage-II) on hire basis for the office of the Assistant Engineer, Durgapur Sub-Division (Burdwan North) P.H.E. Dte. Govt. of West Bengal (for the period of 01/01/2024 to 31/05/2024) Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer1, Durgapur Sub-Division, PHE Dte. ORD/001180/2023-2024 995/DSD 29/12/2023 183 SUJAUDDIN SEKH 2.00 0.00 0 60
2473 PURBA BARDHAMAN Bhatar,Mangolkote Central Mechanical DEBPUR PIPED WATER SUPPLY SCHEME , SM/13398 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Karjana & others water supply scheme under Bhatar Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000067/2024-2025 2394/CMD 02/08/2024 90 AHALYA ENGINEERING WORKS 82.00 0.00 0 0
2474 PURBA BARDHAMAN Bhatar,Mangolkote Central Mechanical DEBPUR PIPED WATER SUPPLY SCHEME , SM/13398 New Continuation order-Hiring of Inspection Vehicle (Diesel/CNG/LPG Driven ) for supervision of site for the office of the Assistant Engineer,under CMD,PHE,Dte. [W.e.f-29/06/2024 to 31/07/2024] ASSISTANT ENGINEER Junior Engineer ORD/000424/2024-2025 897/CMSD 28/06/2024 33 SUBRATA BHADRA 0.40 0.00 0 0
2475 PURBA BARDHAMAN Bhatar,Mangolkote Burdwan Division DEBPUR PIPED WATER SUPPLY SCHEME , SM/13398 New Different works related (sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of different capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site) to DHENRIA, MAHATA, DEBPUR Piped Water Supply Scheme under BHATAR Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer2, Durgapur Sub-Division, PHE Dte. ORD/000019/2023-2024 1737/BWD 13/04/2023 719 M/S B. RAI CONSTRUCTION COMPANY 1,643.39 24.50 1.49 52
2476 PURBA BARDHAMAN Khandaghosh Burdwan Division BICHKHARA PIPED WATER SUPPLY SCHEME , SM/13422 New Material Requisition To Resource Division RTOR000077/2022-2023 1265/BWD 17/03/2023 Resource Division 2.71 0.00 0 0
2477 PURBA BARDHAMAN Khandaghosh Burdwan Division BICHKHARA PIPED WATER SUPPLY SCHEME , SM/13422 New Material Requisition To Resource Division RTOR000098/2022-2023 1962/BWD 25/04/2023 Resource Division 2.14 0.00 0 0
2478 PURBA BARDHAMAN Khandaghosh Central Mechanical BICHKHARA PIPED WATER SUPPLY SCHEME , SM/13422 New New service connection charges for Bichkhara W/S Scheme TW-1 BILL/00683/2023-2024 BP-2023-24-29 22/06/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 4.61 0.00 0 0
2479 PURBA BARDHAMAN Khandaghosh Central Mechanical BICHKHARA PIPED WATER SUPPLY SCHEME , SM/13422 New New service connection charges for Bichkhara W/S Scheme TW-2 BILL/00684/2023-2024 BP-2023-24-30 22/06/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 0.64 0.00 0 0
2480 PURBA BARDHAMAN Khandaghosh Burdwan Division BICHKHARA PIPED WATER SUPPLY SCHEME , SM/13422 New Material Requisition To Resource Division RTOR000711/2023-2024 5042/BWD 23/11/2023 Resource Division 20.46 0.00 0 0
2481 PURBA BARDHAMAN Khandaghosh Burdwan Division BICHKHARA PIPED WATER SUPPLY SCHEME , SM/13422 New BICHKHARA Piped Water Supply Scheme with sinking of Tube-well, LDS, Rising Main, FHTC, construction of switch-rooms & boundary walls at different TW site under KHANDOGHOSH Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer1, Durgapur Sub-Division, PHE Dte.,Junior Engineer2, Durgapur Sub-Division, PHE Dte. ORD/000638/2022-2023 253/BWD 16/01/2023 180 KOUSIK MALLICK 121.67 66.82 54.92 90
2482 PURBA BARDHAMAN Khandaghosh Central Mechanical BICHKHARA PIPED WATER SUPPLY SCHEME , SM/13422 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at Bichkhara Water Supply Scheme [ Block- Khandogosh ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER Junior Engineer ORD/000042/2023-2024 2494/CMD 01/06/2023 30 CONCORD ENGINEERING 28.89 22.82 78.99 98
2483 PURBA BARDHAMAN Khandaghosh Central Mechanical BICHKHARA PIPED WATER SUPPLY SCHEME , SM/13422 New Supply & delivery of standby Submersible pumping machinery & automatic Chlorinator for Bichkhara & others water supply scheme, under CMD, P.H.E. Dte., Dist.- Purba Bardhaman ASSISTANT ENGINEER Junior Engineer ORD/001408/2023-2024 149/CMSD 22/01/2024 15 CHOUDHURY ENTERPRISE 1.76 0.00 0 100
2484 PURBA BARDHAMAN Khandaghosh Central Mechanical BICHKHARA PIPED WATER SUPPLY SCHEME , SM/13422 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at BICHKHARA & others water supply scheme under Khandoghosh Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman ASSISTANT ENGINEER Junior Engineer ORD/000064/2024-2025 2390/CMD 02/08/2024 90 MS DAS ELECTRIC CO 46.54 0.00 0 0
2485 PURBA BARDHAMAN Khandaghosh Burdwan Division BICHKHARA PIPED WATER SUPPLY SCHEME , SM/13422 New Balance work for providing Functional Household Tap Connection (FHTC) within the command area BICHKHARA & TELUN W/S. Scheme of Khandaghosh Block under Burdwan Division, PHE. Dte. Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer1, Durgapur Sub-Division, PHE Dte. ORD/001096/2024-2025 434/BWD 20/01/2025 120 KOUSIK MALLICK 108.55 0.00 0 0
2486 PURBA BARDHAMAN Ausgram - II Burdwan Division BHUYERA PIPED WATER SUPPLY SCHEME , SM/13948 New Material Requisition To Resource Division RTOR000049/2023-2024 1962/BWD 25/04/2023 Resource Division 2.34 0.00 0 0
2487 PURBA BARDHAMAN Ausgram - II Burdwan Division BHUYERA PIPED WATER SUPPLY SCHEME , SM/13948 New Material Requisition To Resource Division RTOR000258/2023-2024 2197/BWD 12/05/2023 Resource Division 13.16 0.00 0 0
2488 PURBA BARDHAMAN Ausgram - II Burdwan Division BHUYERA PIPED WATER SUPPLY SCHEME , SM/13948 New Material Requisition To Resource Division RTOR000619/2023-2024 4886/BWD 10/11/2023 Resource Division 30.36 0.00 0 0
2489 PURBA BARDHAMAN Ausgram - II Central Mechanical BHUYERA PIPED WATER SUPPLY SCHEME , SM/13948 New New service connection charges for Bhuyera PWSS TW-1 BILL/01780/2023-2024 BP-2023-24-285 26/12/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 7.30 0.00 0 0
2490 PURBA BARDHAMAN Ausgram - II Central Mechanical BHUYERA PIPED WATER SUPPLY SCHEME , SM/13948 New New service connection for Bhuyera W/S scheme TW No-1 BILL/02277/2023-2024 BP-2023-24-312 19/01/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.52 0.00 0 0
2491 PURBA BARDHAMAN Ausgram - II Central Mechanical BHUYERA PIPED WATER SUPPLY SCHEME , SM/13948 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at BHUYERA Water Supply Scheme [ Block- AUSGRAM-2] under CMD, PHE Dte., Dist.- Purba-Bardhaman. Driller In-Charge JUNIOR ENGINEER ORD/000837/2023-2024 4111/CMD 29/08/2023 30 SOUNAK ENTERPRISE 29.61 0.00 0 48
2492 PURBA BARDHAMAN Ausgram - II Central Mechanical BHUYERA PIPED WATER SUPPLY SCHEME , SM/13948 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Chora, Kalaijhuti & others water supply scheme under Ausgram-2 Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. Driller In-Charge JUNIOR ENGINEER ORD/000143/2024-2025 2405/CMD 02/08/2024 90 NABAUDYOG ELECTRICAL ENGINEERING CO-OPERATIVE SOCIETY LTD 95.26 0.00 0 0
2493 PURBA BARDHAMAN Ausgram - II Burdwan Division BHUYERA PIPED WATER SUPPLY SCHEME , SM/13948 New Different works related (sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of different capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site) to BHUYERA & JALIKANDAR Piped Water Supply Scheme under Ausgram-II Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer ORD/000491/2023-2024 3509/BWD 10/08/2023 773 MANGES INDUSTRIAL CORPORATION 950.78 19.02 2 60
2494 PURBA BARDHAMAN Ausgram - II Durgapur W/S Division BHUYERA PIPED WATER SUPPLY SCHEME , SM/13948 New FORMAL WORK ORDER FOR Balance and additional works for sinking of 300X200 mm dia X 210 mtr deapth RRM Tube well and laying pipe line (LDS),FHTC, Construction of Switch Room,Pump House,Inter Connection along with road restoration and construction of Boundary wall for head worksites and other allieds work related to JJM (7 Nos PWSS) i.e. Aushgram PWSS, Jalkandar and Bhuyera PWSS, Karatia PWSS, Khandari PWSS, Pichkuri PWSS, Shibda PWSS under Aushgram-I and II,Galsi-I and II Block under DURGAPUR W/S DIVISION,PHE Dte. Assistant Engineer-I,Assistant Engineer-II Contractual Junior Engineer_1,Contractual Junior Engineer_2,Contractual Junior Engineer_3,Contractual Junior Engineer_4,Contractual Junior Engineer_5,JUNIOR ENGINEER-1,JUNIOR ENGINEER-2,Junior Engineer_3 ORD/000286/2024-2025 493/DWSD 19/03/2025 185 MANASH GHOSH 745.87 0.00 0 0
2495 PURBA BARDHAMAN Ausgram - I Burdwan Division BHOTA PIPED WATER SUPPLY SCHEME , SM/13293 New Material Requisition To Resource Division RTOR000021/2023-2024 1962/BWD 25/04/2023 Resource Division 3.99 0.00 0 0
2496 PURBA BARDHAMAN Ausgram - I Burdwan Division BHOTA PIPED WATER SUPPLY SCHEME , SM/13293 New Material Requisition To Resource Division RTOR000256/2023-2024 2197/BWD 12/05/2023 Resource Division 18.44 0.00 0 0
2497 PURBA BARDHAMAN Ausgram - I Burdwan Division BHOTA PIPED WATER SUPPLY SCHEME , SM/13293 New Material Requisition To Resource Division RTOR000495/2023-2024 4019/BWD 08/09/2023 Resource Division 4.01 0.00 0 0
2498 PURBA BARDHAMAN Ausgram - I Burdwan Division BHOTA PIPED WATER SUPPLY SCHEME , SM/13293 New Material Requisition To Resource Division RTOR000642/2023-2024 5108/BWD 23/11/2023 Resource Division 20.18 0.00 0 0
2499 PURBA BARDHAMAN Ausgram - I Central Mechanical BHOTA PIPED WATER SUPPLY SCHEME , SM/13293 New Quotation for new service connection at Bhota W/S Scheme for PH No-2 BILL/01822/2023-2024 BP-2023-24-326 03/01/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.81 0.00 0 0
2500 PURBA BARDHAMAN Ausgram - I Central Mechanical BHOTA PIPED WATER SUPPLY SCHEME , SM/13293 New Quotation for new service connection at Bhota W/S Scheme for PH No-1 BILL/01823/2023-2024 BP-2023-24-325 03/01/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.77 0.00 0 0
2501 PURBA BARDHAMAN Ausgram - I Burdwan Division BHOTA PIPED WATER SUPPLY SCHEME , SM/13293 New Different works related (sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of different capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site) to AUSGRAM & BHOTA Piped Water Supply Scheme under Ausgram-I Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer1, Durgapur Sub-Division, PHE Dte. ORD/000430/2023-2024 3324/BWD 02/08/2023 365 DUTTA ENTERPRISE 763.14 0.00 0 50
2502 PURBA BARDHAMAN Ausgram - I Central Mechanical BHOTA PIPED WATER SUPPLY SCHEME , SM/13293 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Pichkuri, karatia & others water supply scheme under Ausgram-1 Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman Driller In-Charge JUNIOR ENGINEER ORD/000398/2024-2025 2764/CMD 26/09/2024 90 JAL PRAVAHIKA PVT LTD 52.55 0.00 0 0
2503 PURBA BARDHAMAN Ausgram - I Durgapur W/S Division BHOTA PIPED WATER SUPPLY SCHEME , SM/13293 New Acceptance cum Formal Work Order for LDS,FHTC,Road Restoration,Develop Boundary Wall Hight & Land Developement making With necessary allied works at AUSGRAM-I Block of BHOTA PWSS under Durgapur Water Supply Division, PHE Dte. Assistant Engineer-II Contractual Junior Engineer_1 ORD/000180/2024-2025 1617/DWSD 26/11/2024 90 TULIP ENGINEERS CO OP. SOCIETY LTD. 55.22 0.00 0 0
2504 PURBA BARDHAMAN Ausgram - I Durgapur W/S Division BHOTA PIPED WATER SUPPLY SCHEME , SM/13293 New Material Requisition To Resource Division RTOR000016/2024-2025 1724/C/DWSD 10/12/2024 Resource Division 3.52 0.00 0 0
2505 PURBA BARDHAMAN Ausgram - I Central Mechanical BHOTA PIPED WATER SUPPLY SCHEME , SM/13293 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at Bhota Water Supply Scheme [ Block- Ausgram-1 ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. Driller In-Charge JUNIOR ENGINEER ORD/000741/2023-2024 4051/CMD 29/08/2023 615 ANANTA ELECTRICAL ENGINEERING CONSTRUCTION 29.56 0.00 0 48
2506 PURBA BARDHAMAN Ausgram - I Durgapur W/S Division BHOTA PIPED WATER SUPPLY SCHEME , SM/13293 New Material Requisition To Resource Division RTOR000032/2024-2025 452/DWSD 17/03/2025 Resource Division 0.14 0.00 0 0
2507 PURBA BARDHAMAN Burdwan - II Burdwan Division Amra Piped Water Supply Scheme , SM/13296 New Material Requisition To Resource Division RTOR000018/2023-2024 1962/BWD 25/04/2023 Resource Division 2.95 0.00 0 0
2508 PURBA BARDHAMAN Burdwan - II Burdwan Division Amra Piped Water Supply Scheme , SM/13296 New Material Requisition To Resource Division RTOR000701/2023-2024 5060/BWD 23/11/2023 Resource Division 20.46 0.00 0 0
2509 PURBA BARDHAMAN Burdwan - II Burdwan Division Amra Piped Water Supply Scheme , SM/13296 New Material Requisition To Resource Division RTOR000771/2023-2024 195/BWD 10/01/2024 Resource Division 5.52 0.00 0 0
2510 PURBA BARDHAMAN Burdwan - II Central Mechanical Amra Piped Water Supply Scheme , SM/13296 New New Service connection forAmra PWSS TW-2. BILL/02336/2023-2024 BP-2023-24-473 31/01/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 16.94 0.00 0 0
2511 PURBA BARDHAMAN Burdwan - II Central Mechanical Amra Piped Water Supply Scheme , SM/13296 New New Service connection for Amra PWSS TW-1. BILL/02337/2023-2024 BP-2023-24-472 31/01/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 8.51 0.00 0 0
2512 PURBA BARDHAMAN Burdwan - II Burdwan Division Amra Piped Water Supply Scheme , SM/13296 New Different works related (sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of different capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site) to AMRA & BAIKUNTHAPUR Piped Water Supply Scheme under Burdwan II Block, District:- Purba Bardhaman [NEW SCHEME] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. Junior Engineer, Burdwan Sadar Sub-Division ORD/000089/2023-2024 2214/BWD 15/05/2023 365 CONCORD ENGINEERING 750.87 0.00 0 20
2513 PURBA BARDHAMAN Burdwan - II Central Mechanical Amra Piped Water Supply Scheme , SM/13296 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at KUSHA & others water supply scheme under Bardhaman-II Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman ASSISTANT ENGINEER Junior Engineer ORD/000065/2024-2025 2389/CMD 02/08/2024 90 DILIP MAHATO 53.14 0.00 0 0
2514 PURBA BARDHAMAN Burdwan - II Central Mechanical Amra Piped Water Supply Scheme , SM/13296 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at Amra Water Supply Scheme [ Block- Burdwan-2 ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000672/2023-2024 4005/CMD 29/08/2023 30 S.K. ENTERPRISE 28.98 0.00 0 85
2515 PURBA BARDHAMAN Burdwan - II Burdwan Division Amra Piped Water Supply Scheme , SM/13296 New Continuation Work for the supply of one no. Diesel driven Motor Cab/Maxi Cab (Air Conditioner) on hire basis for the office of the Assistant Engineer, to be used by the Assistant Engineer, RWS Burdwan Sub-Divn., PHE. Dte. (Period from 01/05/2024 to 30/06/2024) Contractual Junior Engineer,Junior Engineer, R.W.S. Burdwan Sub Division, P.H.E. Dt ORD/000151/2024-2025 154/RWS 29/04/2024 60 MD HASIN 0.80 0.55 68.75 0
2516 PURBA BARDHAMAN Purbasthali - I Burdwan Division MANGANPUR PIPED WATER SUPPLY SCHEME , SM/13327 New Material Requisition To Resource Division RTOR000339/2023-2024 2197/BWD 12/05/2023 Resource Division 11.02 0.00 0 0
2517 PURBA BARDHAMAN Purbasthali - I Burdwan Division MANGANPUR PIPED WATER SUPPLY SCHEME , SM/13327 New Material Requisition To Resource Division RTOR000475/2023-2024 3999/BWD 08/09/2023 Resource Division 3.31 0.00 0 0
2518 PURBA BARDHAMAN Purbasthali - I Central Mechanical MANGANPUR PIPED WATER SUPPLY SCHEME , SM/13327 New New service connection charges for Manganpur PWSS TW-1 BILL/01670/2023-2024 BP-2023-24-227 10/11/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 9.63 0.00 0 0
2519 PURBA BARDHAMAN Purbasthali - I Central Mechanical MANGANPUR PIPED WATER SUPPLY SCHEME , SM/13327 New Supply & Installation of Submersible Pumping Machinery , Voltage Stabilizer, Chlorination System and Internal House wiring for Tube well no.- 1 & 2 at MANGANPUR Water Supply Scheme [Block-PURBASTHALI-1] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000730/2023-2024 4040/CMD 29/08/2023 30 SOUNAK ENTERPRISE 22.10 5.00 22.62 50
2520 PURBA BARDHAMAN Purbasthali - I Burdwan Division MANGANPUR PIPED WATER SUPPLY SCHEME , SM/13327 New Material Requisition To Resource Division RTOR000802/2023-2024 315/BWD 24/01/2024 Resource Division 17.52 0.00 0 0
2521 PURBA BARDHAMAN Purbasthali - I Central Mechanical MANGANPUR PIPED WATER SUPPLY SCHEME , SM/13327 New Supply and delivery of portable generator set for emergency internal installation work at Manganpur and other Water Supply Scheme under CMD., PHE Dte. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/001419/2023-2024 153/CMSD 22/01/2024 15 M/S, MONDAL ASSOCIATES. 2.11 0.00 0 100
2522 PURBA BARDHAMAN Purbasthali - I Central Mechanical MANGANPUR PIPED WATER SUPPLY SCHEME , SM/13327 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Haripur & others water supply scheme under purbasthali 1 Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000072/2024-2025 2397/CMD 02/08/2024 90 CHATTERJEE ENTERPRISE 48.60 0.00 0 0
2523 PURBA BARDHAMAN Purbasthali - I Central Mechanical MANGANPUR PIPED WATER SUPPLY SCHEME , SM/13327 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Manganpur & others water supply scheme under Purbasthali 1 Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000714/2024-2025 2979/CMD 25/11/2024 90 H.K. DAS & CO. 53.27 0.00 0 0
2524 PURBA BARDHAMAN Purbasthali - I Burdwan Division MANGANPUR PIPED WATER SUPPLY SCHEME , SM/13327 New Different types of works involve in connection with Augmentation of SRIRAMPUR (Zone I & II) (SM/08103), MANGANPUR (SM/13327), KAMALPUR (SM/13453) Piped Water Supply Scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000190/2024-2025 2429/BWD 27/06/2024 480 S.P. CONSTRUCTION 500.89 0.00 0 2
2525 PURBA BARDHAMAN Purbasthali - I Burdwan Division MANGANPUR PIPED WATER SUPPLY SCHEME , SM/13327 New Different works related (sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of different capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site) to MANGANPUR & BAGPUR Piped Water Supply Scheme under Purbasthali-I Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000391/2023-2024 3200/BWD 24/07/2023 730 M/S GHOSH & CO. 711.81 0.00 0 10
2526 PURBA BARDHAMAN Purbasthali - I Central Mechanical MANGANPUR PIPED WATER SUPPLY SCHEME , SM/13327 New PAYMENT FOR WBSEDCL QUOTATION FOR NEW SERVICE CONNECTION AT MAGANPUR PWSS TW NO.-02 BILL/01526/2024-2025 BP-2024-25-481 27/03/2025 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 4.98 0.00 0 null
2527 PURBA BARDHAMAN Ausgram - II Burdwan Division KALAIJHUTI PIPED WATER SUPPLY SCHEME , SM/14954 New Material Requisition To Resource Division RTOR000005/2023-2024 1962/BWD 25/04/2023 Resource Division 1.78 0.00 0 0
2528 PURBA BARDHAMAN Ausgram - II Burdwan Division KALAIJHUTI PIPED WATER SUPPLY SCHEME , SM/14954 New Material Requisition To Resource Division RTOR000174/2023-2024 2155/BWD 10/05/2023 Resource Division 16.15 0.00 0 0
2529 PURBA BARDHAMAN Ausgram - II Central Mechanical KALAIJHUTI PIPED WATER SUPPLY SCHEME , SM/14954 New New service connection charges for Kalaijhuti PWSS TW-1 BILL/00760/2023-2024 BP-2023-24-60 17/07/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 2.51 0.00 0 0
2530 PURBA BARDHAMAN Ausgram - II Central Mechanical KALAIJHUTI PIPED WATER SUPPLY SCHEME , SM/14954 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at KALAIJHUTI Water Supply Scheme [ Block- AUSGRAM-2 ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. Driller In-Charge JUNIOR ENGINEER ORD/000046/2023-2024 2509/CMD 02/06/2023 30 SOUNAK ENTERPRISE 27.79 10.38 37.35 30
2531 PURBA BARDHAMAN Ausgram - II Burdwan Division KALAIJHUTI PIPED WATER SUPPLY SCHEME , SM/14954 New Material Requisition To Resource Division RTOR000616/2023-2024 4876/BWD 10/11/2023 Resource Division 30.36 0.00 0 0
2532 PURBA BARDHAMAN Ausgram - II Central Mechanical KALAIJHUTI PIPED WATER SUPPLY SCHEME , SM/14954 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Chora, Kalaijhuti & others water supply scheme under Ausgram-2 Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. Driller In-Charge JUNIOR ENGINEER ORD/000143/2024-2025 2405/CMD 02/08/2024 90 NABAUDYOG ELECTRICAL ENGINEERING CO-OPERATIVE SOCIETY LTD 95.26 0.00 0 0
2533 PURBA BARDHAMAN Ausgram - II Burdwan Division KALAIJHUTI PIPED WATER SUPPLY SCHEME , SM/14954 New KALAIJHUTI [Kalaijhuti Village (Node Point 1 to 84)] Piped Water Supply Scheme with sinking of Tube-well, LDS, Rising Main, FHTC & construction of switch rooms & boundary walls with gates and land development, drain and internal pathway at different TW site under AUSGRAM-II Block, District:- Purba-Bardhaman [NEW SCHEME]. Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer ORD/000804/2022-2023 1565/BWD 30/03/2023 90 PABITRA KUMAR SAMANTA 93.00 51.47 55.34 100
2534 PURBA BARDHAMAN Ausgram - II Durgapur W/S Division KALAIJHUTI PIPED WATER SUPPLY SCHEME , SM/14954 New Acceptance cum Formal Work Order for Additional work for laying of Extension or Laying of parallel pipeline,providing FHTC,Road Restoration work, Land development under Kalaijhuti PWSS in Ausgram -II Block under Durgapur Water Supply Division, PHE Dte. Assistant Engineer-II Contractual Junior Engineer_5 ORD/000176/2024-2025 1622/DWSD 26/11/2024 60 ROY CONSTRUCTION 27.08 0.00 0 40
2535 PURBA BARDHAMAN Ausgram - II Durgapur W/S Division KALAIJHUTI PIPED WATER SUPPLY SCHEME , SM/14954 New Material Requisition To Resource Division RTOR000052/2024-2025 472/DWSD 17/03/2025 Resource Division 0.07 0.00 0 0
2536 PURBA BARDHAMAN Kalna - I Burdwan Division NIRALGACHHI PIPED WATER SUPPLY SCHEME , SM/14436 New Material Requisition To Resource Division RTOR000042/2023-2024 1962/BWD 25/04/2023 Resource Division 37.35 0.00 0 0
2537 PURBA BARDHAMAN Kalna - I Burdwan Division NIRALGACHHI PIPED WATER SUPPLY SCHEME , SM/14436 New Material Requisition To Resource Division RTOR000178/2023-2024 2155/BWD 10/05/2023 Resource Division 20.14 0.00 0 0
2538 PURBA BARDHAMAN Kalna - I Central Mechanical NIRALGACHHI PIPED WATER SUPPLY SCHEME , SM/14436 New NEW SERVICE CONNECTION FOR NIRALGACHI PWSS TW-I BILL/00106/2024-2025 BP-2024-25-42 26/04/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 9.14 0.00 0 0
2539 PURBA BARDHAMAN Kalna - I Central Mechanical NIRALGACHHI PIPED WATER SUPPLY SCHEME , SM/14436 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Joykrishnapur & others water supply scheme under Purbasthali-2,jamalpur,kalna 1 Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000101/2024-2025 2398/CMD 02/08/2024 90 MS S G ENTERPRISE 53.43 0.00 0 0
2540 PURBA BARDHAMAN Kalna - I Central Mechanical NIRALGACHHI PIPED WATER SUPPLY SCHEME , SM/14436 New Quotation for new service connection at Niralgachi PWSS TW-2. BILL/00663/2024-2025 BP-2024-25-265 20/08/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 8.28 0.00 0 0
2541 PURBA BARDHAMAN Kalna - I Burdwan Division NIRALGACHHI PIPED WATER SUPPLY SCHEME , SM/14436 New Different works related (sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of different capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site) to TAIPARA & NIRALGACHHI Piped Water Supply Scheme under Manteswar Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer Junior Engineer, R.W.S. Burdwan Sub Division, P.H.E. Dt ORD/000048/2023-2024 1825/BWD 19/04/2023 865 S. GHOSH & ASSOCIATES PVT LTD. 1,064.74 0.00 0 85
2542 PURBA BARDHAMAN Kalna - I Burdwan Division NIRALGACHHI PIPED WATER SUPPLY SCHEME , SM/14436 New Work Order for "DESIGNING,MAKING AND ERECTION OF SIGN BOARD FOR SAJAL GRAM IN ¿¿4 No... VILLAGE, ¿KALNA-I.. BLOCK UNDER KALNA SUB DIVISION WITHIN BURDWAN DIVISION PHE DTE.(12nos board)". Assistant Engineer Junior Engineer, R.W.S. Burdwan Sub Division, P.H.E. Dt ORD/000950/2024-2025 1975/KSD 05/12/2024 10 OMKAR ENTERPRISE 1.68 0.00 0 100
2543 PURBA BARDHAMAN Kalna - I Central Mechanical NIRALGACHHI PIPED WATER SUPPLY SCHEME , SM/14436 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at Niralgachhi Water Supply Scheme [ Block- KALNA-1 ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000759/2023-2024 4061/CMD 29/08/2023 644 M/S, S.S. ENTERPRISE. 27.79 0.00 0 90
2544 PURBA BARDHAMAN Burdwan - I Burdwan Division BAHIR SARBAMANGALA-B PIPED WATER SUPPLY SCHEME , SM/14979 New Material Requisition To Resource Division RTOR000202/2023-2024 2155/BWD 10/05/2023 Resource Division 13.95 0.00 0 0
2545 PURBA BARDHAMAN Burdwan - I Burdwan Division BAHIR SARBAMANGALA-B PIPED WATER SUPPLY SCHEME , SM/14979 New BAHIRSARBAMANGALA-B Piped Water Supply Scheme with sinking of Tube-well, LDS, Rising Main, FHTC, Construction of 300 cum capacity RCC OHR with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drain and internal pathway at different TW site under Burdwan-I Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000107/2023-2024 2298/BWD 19/05/2023 365 MLG CONSTRUCTION 308.66 0.00 0 0
2546 PURBA BARDHAMAN Burdwan - I Burdwan Division BAHIR SARBAMANGALA-B PIPED WATER SUPPLY SCHEME , SM/14979 New Material Requisition To Resource Division RTOR000508/2023-2024 4032/BWD 08/09/2023 Resource Division 6.34 0.00 0 0
2547 PURBA BARDHAMAN Burdwan - I Central Mechanical BAHIR SARBAMANGALA-B PIPED WATER SUPPLY SCHEME , SM/14979 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at Bahir Sarbamangala-B Water Supply Scheme [ Block- Burdwan-1 ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER Junior Engineer ORD/001049/2023-2024 4046/CMD 29/08/2023 30 CHOUDHURY ENTERPRISE 29.34 0.00 0 0
2548 PURBA BARDHAMAN Burdwan - I Burdwan Division BAHIR SARBAMANGALA-B PIPED WATER SUPPLY SCHEME , SM/14979 New Material Requisition To Resource Division RTOR000646/2023-2024 5095/BWD 23/11/2023 Resource Division 20.46 0.00 0 0
2549 PURBA BARDHAMAN Bhatar Burdwan Division POALKURA PIPED WATER SUPPLY SCHEME , SM/14061 New Material Requisition To Resource Division RTOR000372/2023-2024 2197/BWD 12/05/2023 Resource Division 15.26 0.00 0 0
2550 PURBA BARDHAMAN Bhatar Burdwan Division POALKURA PIPED WATER SUPPLY SCHEME , SM/14061 New Material Requisition To Resource Division RTOR000555/2023-2024 4948/BWD 10/11/2023 Resource Division 1.30 0.00 0 0
2551 PURBA BARDHAMAN Bhatar Burdwan Division POALKURA PIPED WATER SUPPLY SCHEME , SM/14061 New Material Requisition To Resource Division RTOR000753/2023-2024 5239/BWD 30/11/2023 Resource Division 18.50 0.00 0 0
2552 PURBA BARDHAMAN Bhatar Central Mechanical POALKURA PIPED WATER SUPPLY SCHEME , SM/14061 New New Service connection at Poalkura PWSS PH-1 BILL/02319/2023-2024 BP-2023-24-455 30/01/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 6.32 0.00 0 0
2553 PURBA BARDHAMAN Bhatar Central Mechanical POALKURA PIPED WATER SUPPLY SCHEME , SM/14061 New New service connection for Poalkora PWSS BILL/02560/2023-2024 BP-2023-24-545 19/02/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 0.14 0.00 0 0
2554 PURBA BARDHAMAN Bhatar Central Mechanical POALKURA PIPED WATER SUPPLY SCHEME , SM/14061 New New service connection for Poalkura PWSS BILL/02842/2023-2024 BP-2023-24-590 04/03/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 6.85 0.00 0 0
2555 PURBA BARDHAMAN Bhatar Central Mechanical POALKURA PIPED WATER SUPPLY SCHEME , SM/14061 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at POALKURA Water Supply Scheme [ Block- BHATAR] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000917/2023-2024 4181/CMD 29/08/2023 30 M/S, S.S. ENTERPRISE. 27.65 0.00 0 40
2556 PURBA BARDHAMAN Bhatar Central Mechanical POALKURA PIPED WATER SUPPLY SCHEME , SM/14061 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Karjana & others water supply scheme under Bhatar Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000067/2024-2025 2394/CMD 02/08/2024 90 AHALYA ENGINEERING WORKS 82.00 0.00 0 0
2557 PURBA BARDHAMAN Bhatar Central Mechanical POALKURA PIPED WATER SUPPLY SCHEME , SM/14061 New Additional quotation for new service connection for POALKURA PWSS PH1 BILL/01221/2024-2025 BP-2024-25-418 16/12/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 2.50 0.00 0 0
2558 PURBA BARDHAMAN Bhatar Burdwan Division POALKURA PIPED WATER SUPPLY SCHEME , SM/14061 New Different works related (sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of different capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site) to NABASTA, PASHALA & POALKURA Piped Water Supply Scheme under Bhatar Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer1, Durgapur Sub-Division, PHE Dte.,Junior Engineer2, Durgapur Sub-Division, PHE Dte. ORD/000739/2023-2024 4652/BWD 31/10/2023 702 STARCO CONSTRUCTIONS 900.17 0.00 0 2
2559 PURBA BARDHAMAN Ausgram - II Burdwan Division KHANDARI PIPED WATER SUPPLY SCHEME , SM/13396 New Material Requisition To Resource Division RTOR000082/2022-2023 1267/BWD 17/03/2023 Resource Division 13.39 0.00 0 0
2560 PURBA BARDHAMAN Ausgram - II Burdwan Division KHANDARI PIPED WATER SUPPLY SCHEME , SM/13396 New Material Requisition To Resource Division RTOR000038/2023-2024 1962/BWD 25/04/2023 Resource Division 65.98 0.00 0 0
2561 PURBA BARDHAMAN Ausgram - II Burdwan Division KHANDARI PIPED WATER SUPPLY SCHEME , SM/13396 New Material Requisition To Resource Division RTOR000378/2023-2024 2197/BWD 12/05/2023 Resource Division 16.58 0.00 0 0
2562 PURBA BARDHAMAN Ausgram - II Central Mechanical KHANDARI PIPED WATER SUPPLY SCHEME , SM/13396 New New service connection charges for Khandari PWSS TW-1 BILL/00721/2023-2024 BP-2023-24-49 13/07/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 2.71 0.00 0 0
2563 PURBA BARDHAMAN Ausgram - II Central Mechanical KHANDARI PIPED WATER SUPPLY SCHEME , SM/13396 New New service connection charges for Khandari PWSS TW 2 BILL/00816/2023-2024 BP-2023-24-98 02/08/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 2.97 0.00 0 0
2564 PURBA BARDHAMAN Ausgram - II Burdwan Division KHANDARI PIPED WATER SUPPLY SCHEME , SM/13396 New Material Requisition To Resource Division RTOR000636/2023-2024 5104/BWD 23/11/2023 Resource Division 21.42 0.00 0 0
2565 PURBA BARDHAMAN Ausgram - II Central Mechanical KHANDARI PIPED WATER SUPPLY SCHEME , SM/13396 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Chora, Kalaijhuti & others water supply scheme under Ausgram-2 Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. Driller In-Charge JUNIOR ENGINEER ORD/000143/2024-2025 2405/CMD 02/08/2024 90 NABAUDYOG ELECTRICAL ENGINEERING CO-OPERATIVE SOCIETY LTD 95.26 0.00 0 0
2566 PURBA BARDHAMAN Ausgram - II Central Mechanical KHANDARI PIPED WATER SUPPLY SCHEME , SM/13396 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at Khandari Water Supply Scheme [ Block- Ausgram-2 ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. Driller In-Charge JUNIOR ENGINEER ORD/000045/2023-2024 2508/CMD 02/06/2023 30 CHOUDHURY ENTERPRISE 27.79 11.85 42.64 98
2567 PURBA BARDHAMAN Ausgram - II Durgapur W/S Division KHANDARI PIPED WATER SUPPLY SCHEME , SM/13396 New Material Requisition To Resource Division RTOR000009/2024-2025 1724/J/DWSD 10/12/2024 Resource Division 11.03 0.00 0 0
2568 PURBA BARDHAMAN Ausgram - II Burdwan Division KHANDARI PIPED WATER SUPPLY SCHEME , SM/13396 New Different works related (sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of different capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site) to KHANDARI & CHHORA Piped Water Supply Scheme under Ausgram II Block, District:- Purba Bardhaman [NEW SCHEME] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer2, Durgapur Sub-Division, PHE Dte. ORD/000735/2022-2023 1005/BWD 06/03/2023 696 M/S NATIONAL CONSTRUCTION 1,331.54 0.00 0 100
2569 PURBA BARDHAMAN Ausgram - II Durgapur W/S Division KHANDARI PIPED WATER SUPPLY SCHEME , SM/13396 New FORMAL WORK ORDER FOR Balance and additional works for sinking of 300X200 mm dia X 210 mtr deapth RRM Tube well and laying pipe line (LDS),FHTC, Construction of Switch Room,Pump House,Inter Connection along with road restoration and construction of Boundary wall for head worksites and other allieds work related to JJM (7 Nos PWSS) i.e. Aushgram PWSS, Jalkandar and Bhuyera PWSS, Karatia PWSS, Khandari PWSS, Pichkuri PWSS, Shibda PWSS under Aushgram-I and II,Galsi-I and II Block under DURGAPUR W/S DIVISION,PHE Dte. Assistant Engineer-I,Assistant Engineer-II Contractual Junior Engineer_1,Contractual Junior Engineer_2,Contractual Junior Engineer_3,Contractual Junior Engineer_4,Contractual Junior Engineer_5,JUNIOR ENGINEER-1,JUNIOR ENGINEER-2,Junior Engineer_3 ORD/000286/2024-2025 493/DWSD 19/03/2025 185 MANASH GHOSH 745.87 0.00 0 0
2570 PURBA BARDHAMAN Ausgram - II Durgapur W/S Division KHANDARI PIPED WATER SUPPLY SCHEME , SM/13396 New Material Requisition To Resource Division RTOR000029/2024-2025 449/DWSD 17/03/2025 Resource Division 0.14 0.00 0 0
2571 PURBA BARDHAMAN Memari - I Burdwan Division DURGADANGA PIPED WATER SUPPLY SINGLE VILLAGE SCHEME , SM/13417 New Material Requisition To Resource Division RTOR000186/2023-2024 2155/BWD 10/05/2023 Resource Division 10.35 0.00 0 0
2572 PURBA BARDHAMAN Memari - I Central Mechanical DURGADANGA PIPED WATER SUPPLY SINGLE VILLAGE SCHEME , SM/13417 New New service connection charges for Durgadanga PWSS TW-1 BILL/01262/2023-2024 BP-2023-24-122 17/08/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.07 0.00 0 0
2573 PURBA BARDHAMAN Memari - I Burdwan Division DURGADANGA PIPED WATER SUPPLY SINGLE VILLAGE SCHEME , SM/13417 New Material Requisition To Resource Division RTOR000411/2023-2024 3869/BWD 01/09/2023 Resource Division 8.83 0.00 0 0
2574 PURBA BARDHAMAN Memari - I Burdwan Division DURGADANGA PIPED WATER SUPPLY SINGLE VILLAGE SCHEME , SM/13417 New Material Requisition To Resource Division RTOR000749/2023-2024 5250/BWD 30/11/2023 Resource Division 20.21 0.00 0 0
2575 PURBA BARDHAMAN Memari - I Burdwan Division DURGADANGA PIPED WATER SUPPLY SINGLE VILLAGE SCHEME , SM/13417 New DURGADANGA Single Village Scheme with sinking of Tube-well, LDS, Rising Main, FHTC & construction of switch rooms & boundary walls with gates and land development, drain and internal pathway at different TW site under Memari-I Block, District:- Purba-Bardhaman [NEW SCHEME]. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000010/2023-2024 1714/BWD 12/04/2023 90 A R TRADERS 57.63 36.08 62.61 100
2576 PURBA BARDHAMAN Memari - I Central Mechanical DURGADANGA PIPED WATER SUPPLY SINGLE VILLAGE SCHEME , SM/13417 New NEW SERVICE CONNECTION FOR DURGADANGA PWSS BILL/02838/2023-2024 BP-2023-24-587 04/03/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 4.12 0.00 0 0
2577 PURBA BARDHAMAN Memari - I Central Mechanical DURGADANGA PIPED WATER SUPPLY SINGLE VILLAGE SCHEME , SM/13417 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at Durgadanga Water Supply Scheme [ Block- Memari-1 ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER Junior Engineer ORD/000139/2023-2024 2820/CMD 04/07/2023 30 C.M. ENTERPRISE 29.33 0.00 0 95
2578 PURBA BARDHAMAN Memari - I Burdwan Division DURGADANGA PIPED WATER SUPPLY SINGLE VILLAGE SCHEME , SM/13417 New Construction of Boundary wall at HEAD WORK Site & 2nd TW site & Culvert at Head work site & Interconnection between Head work site distribution line 2nd Tw site of DURGADANGA Piped Water Supply Scheme under MEMARI-I Block of Burdwan Division, PHE Dte. (Length -164.00 Mtr, Col-66 Nos). Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000321/2024-2025 2857/BWD 22/07/2024 90 SUSUNIA GP CO. OPERATIVE LABOUR CONTRACT AND CONSTRUCTION SOCIETY LTD. 29.26 0.00 0 0
2579 PURBA BARDHAMAN Memari - I Burdwan Division DURGADANGA PIPED WATER SUPPLY SINGLE VILLAGE SCHEME , SM/13417 New Allied work of Laying distribution system for FHTC work for DURGADANGA Piped Water Supply Scheme at Durgadanga mouza within MEMARI - I Block under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/001017/2023-2024 521/BWD 06/02/2024 30 A R TRADERS 13.36 0.00 0 100
2580 PURBA BARDHAMAN Memari - I Central Mechanical DURGADANGA PIPED WATER SUPPLY SINGLE VILLAGE SCHEME , SM/13417 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at SAHAPUR & others water supply scheme under Memari-I Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. ASSISTANT ENGINEER Junior Engineer ORD/000100/2024-2025 2392/CMD 02/08/2024 90 MITRA ENTERPRISE 47.62 0.00 0 0
2581 PURBA BARDHAMAN Memari - I Burdwan Division DURGADANGA PIPED WATER SUPPLY SINGLE VILLAGE SCHEME , SM/13417 New Sinking of Tube-well, construction of switch rooms & Rising main at 2ND TW site for DURGADANGA Piped Water Supply Scheme under MEMARI-I Block, District:- Purba-Bardhaman. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000868/2023-2024 5307/BWD 01/12/2023 60 A R TRADERS 21.69 1.82 8.39 100
2582 PURBA BARDHAMAN Memari - I Burdwan Division DURGADANGA PIPED WATER SUPPLY SINGLE VILLAGE SCHEME , SM/13417 New Restoration of concrete road by Cement concrete (mix 1:1.5:3),Providing balance FHTC, parallel pipeline, drainage system, boundary wall, Bridge, land development, Sluice valve chamber for smooth water supply of FHTC work for DURGADANGA SVS & DEHA PWSS and its adjoining mouzas within MEMARI-I BLOCK under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/001039/2024-2025 141/BWD 08/01/2025 90 MUKHERJEE ENTERPRISE 64.37 0.00 0 0
2583 PURBA BARDHAMAN Galsi - I Burdwan Division MARO PIPED WATER SUPPLY SCHEME , SM/15579 New Material Requisition To Resource Division RTOR000027/2023-2024 1962/BWD 25/04/2023 Resource Division 3.65 0.00 0 0
2584 PURBA BARDHAMAN Galsi - I Burdwan Division MARO PIPED WATER SUPPLY SCHEME , SM/15579 New Material Requisition To Resource Division RTOR000340/2023-2024 2197/BWD 12/05/2023 Resource Division 7.00 0.00 0 0
2585 PURBA BARDHAMAN Galsi - I Burdwan Division MARO PIPED WATER SUPPLY SCHEME , SM/15579 New Material Requisition To Resource Division RTOR000605/2023-2024 4910/BWD 10/11/2023 Resource Division 12.78 0.00 0 0
2586 PURBA BARDHAMAN Galsi - I Central Mechanical MARO PIPED WATER SUPPLY SCHEME , SM/15579 New New service connection for MARO PWSS, PG-1. BILL/02485/2023-2024 BP-2023-24-537 15/02/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.06 0.00 0 0
2587 PURBA BARDHAMAN Galsi - I Burdwan Division MARO PIPED WATER SUPPLY SCHEME , SM/15579 New MARO Piped Water Supply Scheme with sinking of Tube-well, LDS, Rising Main, FHTC, & construction of switch rooms & boundary walls with gates and land development, drain and internal pathway at different TW site under Galsi-I Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer1, Durgapur Sub-Division, PHE Dte. ORD/000175/2023-2024 2569/BWD 01/06/2023 120 INVENT ENGINEERS CO. OPERATIVE SOCIETY LTD. 113.32 34.59 30.52 90
2588 PURBA BARDHAMAN Galsi - I Burdwan Division MARO PIPED WATER SUPPLY SCHEME , SM/15579 New Different works related (sinking of Tube-wells at Maro Dakshin Para, LDSs, Interconnections, FHTCs, Construction of MARO Piped Water Supply Scheme for obstruction of Railway under Galsi-I Block, of Durgapur Sub Division, under Burdwan Division, PHE. Dte. Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer1, Durgapur Sub-Division, PHE Dte. ORD/000334/2024-2025 2895/BWD 23/07/2024 120 PREMANANDA ROY BISWAS 42.93 0.00 0 0
2589 PURBA BARDHAMAN Galsi - I Central Mechanical MARO PIPED WATER SUPPLY SCHEME , SM/15579 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Satinandi,Sanko & others water supply scheme under Galsi-1 Block ; Serpur, Uchalan & others water supply scheme under Raina-2 Block and maro, loapur & others water supply scheme under Galsi-2 block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000397/2024-2025 2751/CMD 24/09/2024 90 ORIENTAL ENGINEERING CO. 88.42 0.00 0 0
2590 PURBA BARDHAMAN Galsi - I Central Mechanical MARO PIPED WATER SUPPLY SCHEME , SM/15579 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at MARO Water Supply Scheme [ Block- GALSI-1] under CMD, PHE Dte., Dist.- Purba-Bardhaman. Driller In-Charge JUNIOR ENGINEER ORD/000903/2023-2024 4167/CMD 29/08/2023 30 CHOUDHURY ENTERPRISE 28.54 0.54 1.89 48
2591 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of kalyanpur Piped Water Supply Scheme at Kalna-II Block , SM/07806 Retrofitting Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Kalyanpur (Part) village, Kalyan (Part) habitation of Kalyanpur piped water supply scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. (Part-A)[SL NO.-07] Assistant Engineer ORD/000691/2020-2021 57/BWD 05/01/2021 15 SETH ENTERPRISE 4.86 4.86 100 1
2592 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of kalyanpur Piped Water Supply Scheme at Kalna-II Block , SM/07806 Retrofitting Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Kalyanpur (Part) village (Kalyanpur Part habitation) of Kalyanpur piped water supply scheme within Kalna Sub-Division under Burdwan Division, PHE Dte.(Part-B)[SL NO.-08] Assistant Engineer ORD/000744/2020-2021 58/BWD 05/01/2021 15 BISHWAJIT DAS 4.86 4.86 100 1
2593 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of kalyanpur Piped Water Supply Scheme at Kalna-II Block , SM/07806 Retrofitting Sinking of 250 X 150mm dia Tube Well 150 mtr. Depth by D.R. Rig method using UPVC pipe (CM) and UPVC Deep Well Screen (RMS) for 2nd TW Site of KALYANPUR & its adjoining mouzas Piped Water Supply Scheme, Block ? Kalna ? II, Dist - Purba Bardhaman under Burdwan Division, PHE Dte. Assistant Engineer ORD/000546/2022-2023 5128/BWD 21/11/2022 30 MUNSHI ENTERPRISE 8.72 0.00 0 100
2594 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of kalyanpur Piped Water Supply Scheme at Kalna-II Block , SM/07806 Retrofitting Digital structurization of pipeline alignment and asset evaluation including holistic design, preparation of design drawings of overall LDS & preparation of estimate for 03 Nos. Piped W/S. Schemes under Kalna II Block under Kalna Sub-Division under Burdwan Division, PHE. Dte. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000336/2024-2025 3016/BWD 05/08/2024 20 HORIZEN 7.55 0.00 0 100
2595 PURBA BARDHAMAN Bhatar Burdwan Division KARJJANA PIPED WATER SUPPLY SCHEME , SM/15244 New Material Requisition To Resource Division RTOR000081/2022-2023 1248/BWD 17/03/2023 Resource Division 1.91 0.00 0 0
2596 PURBA BARDHAMAN Bhatar Central Mechanical KARJJANA PIPED WATER SUPPLY SCHEME , SM/15244 New New service connection charges for Karjjana PWSS TW-2 BILL/00754/2023-2024 BP-2023-24-54 14/07/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 5.43 0.00 0 0
2597 PURBA BARDHAMAN Bhatar Central Mechanical KARJJANA PIPED WATER SUPPLY SCHEME , SM/15244 New New service connection charges for Karjjana PWSS TW-1 BILL/00753/2023-2024 BP-2023-24-53 18/07/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 2.66 0.00 0 0
2598 PURBA BARDHAMAN Bhatar Burdwan Division KARJJANA PIPED WATER SUPPLY SCHEME , SM/15244 New Material Requisition To Resource Division RTOR000751/2023-2024 5248/BWD 30/11/2023 Resource Division 18.50 0.00 0 0
2599 PURBA BARDHAMAN Bhatar Central Mechanical KARJJANA PIPED WATER SUPPLY SCHEME , SM/15244 New New service connection for KARJANA PWSS, PH-2. BILL/02486/2023-2024 BP-2023-24-535 15/02/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 1.06 0.00 0 0
2600 PURBA BARDHAMAN Bhatar Burdwan Division KARJJANA PIPED WATER SUPPLY SCHEME , SM/15244 New KARJJANA [PART :-A] Piped Water Supply Scheme with sinking of Tube-well, LDS, Rising Main, FHTC & construction of switch rooms & boundary walls with gates and land development, drain and internal pathway at different TW site under Bhatar Block, District:- Purba-Bardhaman [NEW SCHEME]. Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer ORD/000721/2022-2023 955/BWD 03/03/2023 60 DHIRENDRANATH SOM 44.51 13.32 29.93 100
2601 PURBA BARDHAMAN Bhatar Burdwan Division KARJJANA PIPED WATER SUPPLY SCHEME , SM/15244 New KARJJANA [PART :-B] Piped Water Supply Scheme with sinking of Tube-well, LDS, Rising Main, FHTC & construction of switch rooms & boundary walls with gates and land development, drain and internal pathway at different TW site under Bhatar Block, District:- Purba-Bardhaman [NEW SCHEME]. Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer ORD/000722/2022-2023 956/BWD 03/03/2023 60 DHIRENDRANATH SOM 45.79 7.06 15.42 95
2602 PURBA BARDHAMAN Bhatar Central Mechanical KARJJANA PIPED WATER SUPPLY SCHEME , SM/15244 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Karjana & others water supply scheme under Bhatar Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000067/2024-2025 2394/CMD 02/08/2024 90 AHALYA ENGINEERING WORKS 82.00 0.00 0 0
2603 PURBA BARDHAMAN Bhatar Burdwan Division KARJJANA PIPED WATER SUPPLY SCHEME , SM/15244 New Additional Distribution Pipeline work at KARJJANA Piped Water Supply Scheme with Rising Main, LDS & FHTC work under Bhatar Block, District:- Purba-Bardhaman. Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer ORD/001045/2023-2024 789/BWD 27/02/2024 30 DHIRENDRANATH SOM 6.20 4.56 73.55 100
2604 PURBA BARDHAMAN Bhatar Central Mechanical KARJJANA PIPED WATER SUPPLY SCHEME , SM/15244 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at KARJJANA Water Supply Scheme [ Block-BHATAR ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000061/2023-2024 2521/CMD 02/06/2023 1031 MITRA ASSOCIATES 27.66 5.35 19.34 95
2605 PURBA BARDHAMAN Bhatar Burdwan Division KARJJANA PIPED WATER SUPPLY SCHEME , SM/15244 New FIXING OF DISPLAY BOARD WITH M.S STRUCTURE CONTAINING LAND DESCRIPTION AT KARJJANA PWSS AND OTHER SCHEMES (30 Nos.) WITHIN BHATAR BLOCK UNDER BURDWAN DIVISION , PHE Dte. Assistant Engineer, Durgapur Sub Division, P.H.E. Dte JUNIOR ENGINEER DURGAPUR SUB-DIVISION PHE DTE,Junior Engineer2, Durgapur Sub-Division, PHE Dte. ORD/000945/2024-2025 1085/DSD 11/12/2024 15 SHUBHRA KANTI GHOSH 1.95 0.00 0 100
2606 PURBA BARDHAMAN Ausgram - I Burdwan Division ALIGRAM PIPED WATER SUPPLY SCHEME , SM/14927 New Material Requisition To Resource Division RTOR000551/2023-2024 4314/BWD 29/09/2023 Resource Division 1.38 0.00 0 0
2607 PURBA BARDHAMAN Ausgram - I Burdwan Division ALIGRAM PIPED WATER SUPPLY SCHEME , SM/14927 New Material Requisition To Resource Division RTOR000607/2023-2024 4912/BWD 10/11/2023 Resource Division 32.92 0.00 0 0
2608 PURBA BARDHAMAN Ausgram - I Burdwan Division ALIGRAM PIPED WATER SUPPLY SCHEME , SM/14927 New Material Requisition To Resource Division RTOR000777/2023-2024 193/BWD 10/01/2024 Resource Division 6.70 0.00 0 0
2609 PURBA BARDHAMAN Ausgram - I Central Mechanical ALIGRAM PIPED WATER SUPPLY SCHEME , SM/14927 New New service connection at Aligram W/S PWSS PH-1 BILL/02312/2023-2024 BP-2023-24-431 29/01/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.53 0.00 0 0
2610 PURBA BARDHAMAN Ausgram - I Central Mechanical ALIGRAM PIPED WATER SUPPLY SCHEME , SM/14927 New QUOTATION FOR NEW SERVICE CONNECTION AT ALIGRAM PWSS TW 2 BILL/00371/2024-2025 BP-2024-25-193 08/07/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 4.58 0.00 0 0
2611 PURBA BARDHAMAN Ausgram - I Durgapur W/S Division ALIGRAM PIPED WATER SUPPLY SCHEME , SM/14927 New Hiring of LUXURY Diesel Ambassador Car including higher model 2012 onwards of Diesel Ambassador or equivalent for official use for the office of the Executive Engineer ,Durgapur Water Supply Division, Public Health Engineering (w.e.f 01.02.2024 to 31.07.2024).(Sl-01) Assistant Engineer-I,Assistant Engineer-II JUNIOR ENGINEER-1,JUNIOR ENGINEER-2,Junior Engineer_3 ORD/000287/2023-2024 106/DWSD 31/01/2024 180 SUJIT ROY 0.82 0.00 0 25
2612 PURBA BARDHAMAN Ausgram - I Durgapur W/S Division ALIGRAM PIPED WATER SUPPLY SCHEME , SM/14927 New Hiring of Luxury Diesel Ambassadar Car use for Inspection Vehicle of JJM under Office of the Executive Engineer, Durgapur W/S Division, Public Health Engineering Dte at Fagurpur, Nababhat, Purba Bardhaman for the period from 01.03.2024 to 31.08.2024 (6 Months).(Sl-01) Assistant Engineer-I,Assistant Engineer-II JUNIOR ENGINEER-1,JUNIOR ENGINEER-2,Junior Engineer_3 ORD/000294/2023-2024 267/DWSD 29/02/2024 180 PRAMIT CHATTERJEE 0.82 0.00 0 0
2613 PURBA BARDHAMAN Ausgram - I Durgapur W/S Division ALIGRAM PIPED WATER SUPPLY SCHEME , SM/14927 New Continuation order for Acceptance cum formal order for the work of Hiring of LUXURY Diesel Ambassador Car including higher model 2012 onwards of Diesel Ambassador or equivalent for official use for the Executive Engineer, DWSD,PHE Dte ADDA Administrative building 2nd Floor, EPIP Complex, Banskopa,DGP-12 (w.e.f 18.02.2024 to 29.02.2024). (SL-02) Assistant Engineer-I,Assistant Engineer-II JUNIOR ENGINEER-2 ORD/000314/2023-2024 186/DWSD 15/02/2024 12 PRAMIT CHATTERJEE 0.05 0.00 0 100
2614 PURBA BARDHAMAN Ausgram - I Central Mechanical ALIGRAM PIPED WATER SUPPLY SCHEME , SM/14927 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Pichkuri, karatia & others water supply scheme under Ausgram-1 Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman Driller In-Charge JUNIOR ENGINEER ORD/000398/2024-2025 2764/CMD 26/09/2024 90 JAL PRAVAHIKA PVT LTD 52.55 0.00 0 0
2615 PURBA BARDHAMAN Ausgram - I Durgapur W/S Division ALIGRAM PIPED WATER SUPPLY SCHEME , SM/14927 New Material Requisition To Resource Division RTOR000021/2024-2025 2/B/DWSD 02/01/2025 Resource Division 19.60 0.00 0 0
2616 PURBA BARDHAMAN Ausgram - I Durgapur W/S Division ALIGRAM PIPED WATER SUPPLY SCHEME , SM/14927 New Continuation Order for the work of Hiring of LUXURY Diesel Ambassador Car including higher model 2012 onwards of Diesel Ambassador or equivalent for official use for the office of the Executive Engineer ,Durgapur Water Supply Division, Public Health Engineering (w.e.f 01.08.2024 to 31.01.2025).(Sl-01) Assistant Engineer-II JUNIOR ENGINEER-2 ORD/000127/2024-2025 1079/DWSD 30/07/2024 180 SUJIT ROY 0.82 1.19 145.12 0
2617 PURBA BARDHAMAN Ausgram - I Durgapur W/S Division ALIGRAM PIPED WATER SUPPLY SCHEME , SM/14927 New Continuation Order for the work of Hiring of LUXURY Diesel Ambassador Car including higher model 2012 onwards of Diesel Ambassador or equivalent for official use for the office of the Executive Engineer ,Durgapur Water Supply Division, Public Health Engineering (w.e.f 01.02.2025 to 31.07.2025). Assistant Engineer-II JUNIOR ENGINEER-2 ORD/000268/2024-2025 163/DWSD 27/01/2025 180 SUJIT ROY 0.82 0.40 48.78 0
2618 PURBA BARDHAMAN Ausgram - I Durgapur W/S Division ALIGRAM PIPED WATER SUPPLY SCHEME , SM/14927 New Continuation order for Hiring of Luxury Diesel Ambassador Car use for Inspection Vehicle of JJM under Office of the Executive Engineer, Durgapur W/S Division, Public Health Engineering Dte at Fagurpur, Nababhat, Purba Bardhaman for the period from 01.03.2025 to 31.05.2025 (3 Months). Assistant Engineer-II JUNIOR ENGINEER-2 ORD/000280/2024-2025 340/DWSD 27/02/2025 90 PRAMIT CHATTERJEE 0.41 0.00 0 0
2619 PURBA BARDHAMAN Ausgram - I Durgapur W/S Division ALIGRAM PIPED WATER SUPPLY SCHEME , SM/14927 New Continuation order for Hiring of Luxury Diesel Ambassador Car use for Inspection Vehicle of JJM under Office of the Executive Engineer, Durgapur W/S Division, Public Health Engineering Dte at Fagurpur, Nababhat, Purba Bardhaman for the period from 01.09.2024 to 28.02.2025 (6 Months).(Sl-01) Assistant Engineer-II JUNIOR ENGINEER-2 ORD/000138/2024-2025 1244/DWSD 30/08/2024 180 PRAMIT CHATTERJEE 0.82 1.19 145.12 0
2620 PURBA BARDHAMAN Ausgram - I Burdwan Division ALIGRAM PIPED WATER SUPPLY SCHEME , SM/14927 New Different works related (sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of different capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site) to ALIGRAM, JAYKRISHNAPUR, JADABGANJ & KALYANPUR Piped Water Supply Scheme under AUSGRAM-I Block, District:- Purba-Bardhaman [NEW SCHEME] AE(HQs) JUNIOR ENGINEER R.W.S. BURDWAN SUB-DIVISION PHE DTE ORD/000727/2023-2024 4581/BWD 16/10/2023 965 SAFECO ENTERPRISES 1,551.98 29.18 1.88 60
2621 PURBA BARDHAMAN Ausgram - I Central Mechanical ALIGRAM PIPED WATER SUPPLY SCHEME , SM/14927 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at Aligram Water Supply Scheme [ Block- Ausgram-1 ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. Driller In-Charge JUNIOR ENGINEER ORD/000747/2023-2024 4057/CMD 29/08/2023 642 EASTERN INDIA SALES & SERVICE 27.78 0.00 0 48
2622 PURBA BARDHAMAN Memari - I Burdwan Division TATARPUR PIPED WATER SUPPLY SCHEME , SM/14740 New Material Requisition To Resource Division RTOR000330/2023-2024 2197/BWD 12/05/2023 Resource Division 10.10 0.00 0 0
2623 PURBA BARDHAMAN Memari - I Burdwan Division TATARPUR PIPED WATER SUPPLY SCHEME , SM/14740 New Material Requisition To Resource Division RTOR000470/2023-2024 3994/BWD 08/09/2023 Resource Division 12.51 0.00 0 0
2624 PURBA BARDHAMAN Memari - I Burdwan Division TATARPUR PIPED WATER SUPPLY SCHEME , SM/14740 New Material Requisition To Resource Division RTOR000696/2023-2024 5059/BWD 23/11/2023 Resource Division 20.46 0.00 0 0
2625 PURBA BARDHAMAN Memari - I Central Mechanical TATARPUR PIPED WATER SUPPLY SCHEME , SM/14740 New New service connection charges for Tatarpur PWSS TW-1 BILL/01761/2023-2024 BP-2023-24-271 15/12/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 38.70 0.00 0 0
2626 PURBA BARDHAMAN Memari - I Central Mechanical TATARPUR PIPED WATER SUPPLY SCHEME , SM/14740 New New Service connection for Tatarpur W/S Scheme PH No.-II BILL/01792/2023-2024 BP-2023-24-309 30/12/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 9.61 0.00 0 0
2627 PURBA BARDHAMAN Memari - I Burdwan Division TATARPUR PIPED WATER SUPPLY SCHEME , SM/14740 New Continuation order for "Supply of one No. Diesel Driven Ambassador Car on hire basis for the office of the Assistant Engineer, Burdwan Sub-Division, PHE Dte for the period of 01.12.2023 to 31.05.2024 Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/001007/2023-2024 2751/BSD 28/11/2023 183 SK.ASFIA 2.40 0.00 0 70
2628 PURBA BARDHAMAN Memari - I Central Mechanical TATARPUR PIPED WATER SUPPLY SCHEME , SM/14740 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at Tatarpur Water Supply Scheme [ Block- Memari-1 ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER Junior Engineer ORD/000466/2023-2024 3723/CMD 08/08/2023 30 M.S. ENTERPRISE 30.11 0.00 0 95
2629 PURBA BARDHAMAN Memari - I Burdwan Division TATARPUR PIPED WATER SUPPLY SCHEME , SM/14740 New Restoration of concrete road by Cement concrete (mix 1:1.5:3), Providing balance FHTC, parallel pipeline, drainage system, boundary wall, Bridge, land development, Sluice valve chamber for smooth water supply of FHTC work for TATARPUR PWSS and its adjoining mouzas within MEMARI-I BLOCK under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/001116/2024-2025 479/BWD 24/01/2025 90 RANADHIR SINHA 74.75 0.00 0 0
2630 PURBA BARDHAMAN Memari - I Burdwan Division TATARPUR PIPED WATER SUPPLY SCHEME , SM/14740 New TATARPUR Piped Water Supply Scheme with sinking of Tube-well, LDS, Rising Main, FHTC, Construction of 250 cum capacity RCC OHR with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drain and internal pathway at different TW site under Memari-I Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000375/2023-2024 2621/BWD 06/06/2023 940 RANADHIR SINHA 359.46 21.18 5.89 46
2631 PURBA BARDHAMAN Mangolkote Burdwan Division NIGAN PIPE WATER SUPPLY SCHEME , SM/14912 New Material Requisition To Resource Division RTOR000356/2023-2024 2197/BWD 12/05/2023 Resource Division 10.74 0.00 0 0
2632 PURBA BARDHAMAN Mangolkote Burdwan Division NIGAN PIPE WATER SUPPLY SCHEME , SM/14912 New Material Requisition To Resource Division RTOR000459/2023-2024 3983/BWD 08/09/2023 Resource Division 3.91 0.00 0 0
2633 PURBA BARDHAMAN Mangolkote Central Mechanical NIGAN PIPE WATER SUPPLY SCHEME , SM/14912 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at Nigan Water Supply Scheme [ Block- MONGOLKOTE ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. Driller In-Charge Junior Engineer ORD/000770/2023-2024 4068/CMD 29/08/2023 710 AHALYA ENGINEERING WORKS 27.78 0.00 0 44
2634 PURBA BARDHAMAN Mangolkote Burdwan Division NIGAN PIPE WATER SUPPLY SCHEME , SM/14912 New Material Requisition To Resource Division RTOR000806/2023-2024 303/BWD 24/01/2024 Resource Division 20.47 0.00 0 0
2635 PURBA BARDHAMAN Mangolkote Central Mechanical NIGAN PIPE WATER SUPPLY SCHEME , SM/14912 New Quotation for new service connection at Nigan PWSS TW-1 BILL/01084/2024-2025 BP-2024-25-394 22/11/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.95 0.00 0 0
2636 PURBA BARDHAMAN Mangolkote Central Mechanical NIGAN PIPE WATER SUPPLY SCHEME , SM/14912 New Quotation for new service connection at Nigan PWSS TW-2 BILL/01085/2024-2025 BP-2024-25-395 22/11/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 10.15 0.00 0 0
2637 PURBA BARDHAMAN Mangolkote Burdwan Division NIGAN PIPE WATER SUPPLY SCHEME , SM/14912 New Material Requisition To Resource Division RTOR000076/2024-2025 402/BWD 17/01/2025 Resource Division 0.88 0.00 0 0
2638 PURBA BARDHAMAN Mangolkote Central Mechanical NIGAN PIPE WATER SUPPLY SCHEME , SM/14912 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Lakshimpur & others water supply scheme under Mangalkote Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman Driller In-Charge Junior Engineer ORD/000097/2024-2025 2406/CMD 02/08/2024 290 CHOUDHURY ENTERPRISE 57.65 0.00 0 10
2639 PURBA BARDHAMAN Mangolkote Burdwan Division NIGAN PIPE WATER SUPPLY SCHEME , SM/14912 New NIGAN Piped Water Supply Scheme with sinking of Tube-well, LDS, Construction of 250 cum RCC OHR with 20 mtr. staging height including soil testing, Rising Main, FHTC & construction of switch rooms & boundary walls with gates and land development, drain and internal pathway at different TW site under Mangolkote Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer JUNIOR ENGINEER KATWA SUB-DIVISION PHE DTE ORD/000142/2023-2024 2386/BWD 23/05/2023 365 AKASH CONSTRUCTION 400.98 0.00 0 15
2640 PURBA BARDHAMAN Raina - II Burdwan Division Narottambati Piped Water Supply Scheme , SM/15486 New Material Requisition To Resource Division RTOR000352/2023-2024 2197/BWD 12/05/2023 Resource Division 11.94 0.00 0 0
2641 PURBA BARDHAMAN Raina - II Burdwan Division Narottambati Piped Water Supply Scheme , SM/15486 New Material Requisition To Resource Division RTOR000425/2023-2024 3837/BWD 01/09/2023 Resource Division 6.91 0.00 0 0
2642 PURBA BARDHAMAN Raina - II Burdwan Division Narottambati Piped Water Supply Scheme , SM/15486 New Material Requisition To Resource Division RTOR000681/2023-2024 5081/BWD 23/11/2023 Resource Division 20.46 0.00 0 0
2643 PURBA BARDHAMAN Raina - II Burdwan Division Narottambati Piped Water Supply Scheme , SM/15486 New Supply of Inspection Vehicle for inspection of different JJM related (Schemes) works as and when required including supply of driver & fuel (minimum 8 Hours duty per day) and all taxes etc. for Burdwan Sub-Division under Burdwan Division, P.H.E. Dte. consider 96.00 Km. run per day.[Period from 01/08/2023 to 31/10/2023] ORD/000845/2023-2024 1759/BSD 28/07/2023 66 MD HASIN 0.85 0.00 0 0
2644 PURBA BARDHAMAN Raina - II Central Mechanical Narottambati Piped Water Supply Scheme , SM/15486 New New service connection for Narottambati PWSS. BILL/02404/2023-2024 BP-2023-24-496 06/02/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 5.09 0.00 0 0
2645 PURBA BARDHAMAN Raina - II Central Mechanical Narottambati Piped Water Supply Scheme , SM/15486 New NEW SERVICE CONNECTION FOR NAROTTAMBATI PWSS TW 2. BILL/03180/2023-2024 BP-2023-24-664 22/03/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 10.31 0.00 0 0
2646 PURBA BARDHAMAN Raina - II Burdwan Division Narottambati Piped Water Supply Scheme , SM/15486 New NAROTTAMBATI Piped Water Supply Scheme with sinking of Tube-well, LDS, Rising Main, FHTC, Construction of 300 cum capacity RCC OHR with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drain and internal pathway at different TW site under Raina-II Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000488/2023-2024 3501/BWD 10/08/2023 365 S.S.S. ENTERPRISES 585.33 0.00 0 38
2647 PURBA BARDHAMAN Raina - II Central Mechanical Narottambati Piped Water Supply Scheme , SM/15486 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Satinandi,Sanko & others water supply scheme under Galsi-1 Block ; Serpur, Uchalan & others water supply scheme under Raina-2 Block and maro, loapur & others water supply scheme under Galsi-2 block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000397/2024-2025 2751/CMD 24/09/2024 90 ORIENTAL ENGINEERING CO. 88.42 0.00 0 0
2648 PURBA BARDHAMAN Raina - II Burdwan Division Narottambati Piped Water Supply Scheme , SM/15486 New Material Requisition To Resource Division RTOR000045/2024-2025 325/BWD 15/01/2025 Resource Division 2.21 0.00 0 0
2649 PURBA BARDHAMAN Raina - II Central Mechanical Narottambati Piped Water Supply Scheme , SM/15486 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at Narottombati Water Supply Scheme [ Block- Raina-2 ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000909/2023-2024 4173/CMD 29/08/2023 30 J.S. CONSTRUCTION. 29.71 0.00 0 90
2650 PURBA BARDHAMAN Raina - II Burdwan Division Narottambati Piped Water Supply Scheme , SM/15486 New Continuation work order for "Supply of one No. Diesel Driven Ambassador Car on hire basis for the office of the Assistant Engineer, Burdwan Sub-Division, PHE Dte. (Period from 01-12-2024 to 28-02-2025 JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/001043/2024-2025 2636/BSD 29/11/2024 90 SK. ASFIA 1.20 0.00 0 60
2651 PURBA BARDHAMAN Burdwan Division RETROFITTING OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR MUGURA , SM/16488 Retrofitting Extension Pipeline with Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of MUGURA Piped Water Supply Scheme within Raina I Block of Burdwan Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000792/2022-2023 1429/BWD 24/03/2023 30 J K CORPORATION 18.57 18.56 99.95 100
2652 PURBA BARDHAMAN Burdwan Division RETROFITTING OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR MUGURA , SM/16488 Retrofitting Preparation and Submission of DPR for Retrofitting of Mugura PWSS under Raina-I Development Block under Burdwan Division, P.H.E Dte(2nd Call) Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000913/2023-2024 2831/BSD 07/12/2023 15 MEASURE LAND 0.78 0.00 0 100
2653 PURBA BARDHAMAN Burdwan Division RETROFITTING OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR MUGURA , SM/16488 Retrofitting Laying Parallel Pipeline to improve drinking water supply, Construction of Boundary wall, Path Way, Drain at Head Work Site & 2nd TW Site and providing leftout FHTC, Road Restoration with allied work for MUGRA Piped Water Supply Scheme, Block- Raina-I, within Burdwan Sub Division under Burdwan Division PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000279/2024-2025 2711/BWD 11/07/2024 2720 M/S PURBASHA 40.24 0.00 0 70
2654 PURBA BARDHAMAN Ketugram - I Burdwan Division KHATUNDI PIPED WATER SUPPLY SCHEME , SM/15154 New Material Requisition To Resource Division RTOR000384/2023-2024 2197/BWD 12/05/2023 Resource Division 10.05 0.00 0 0
2655 PURBA BARDHAMAN Ketugram - I Burdwan Division KHATUNDI PIPED WATER SUPPLY SCHEME , SM/15154 New Material Requisition To Resource Division RTOR000456/2023-2024 3980/BWD 08/09/2023 Resource Division 0.66 0.00 0 0
2656 PURBA BARDHAMAN Ketugram - I Burdwan Division KHATUNDI PIPED WATER SUPPLY SCHEME , SM/15154 New Material Requisition To Resource Division RTOR000739/2023-2024 5251/BWD 30/11/2023 Resource Division 20.18 0.00 0 0
2657 PURBA BARDHAMAN Ketugram - I Central Drilling KHATUNDI PIPED WATER SUPPLY SCHEME , SM/15154 New Providing drilling crew and other allied works for construction of Tube Well (250mm X200mm X 114 Mtrs. Depth) by utilising Departmental Machineries for Khatundi W/S Scheme (T/W-I & II) , Ketugram-I Block under PurbaBardhman District, Central Drilling Division, P.H.E. Dte. Driller In Charge Junior Engineer ORD/000172/2023-2024 1055/CDD 16/08/2023 30 OSMAN SEKH 16.61 0.00 0 0
2658 PURBA BARDHAMAN Ketugram - I Central Mechanical KHATUNDI PIPED WATER SUPPLY SCHEME , SM/15154 New New service connection charges for Khatundi PWSS TW-1 BILL/01725/2023-2024 BP-2023-24-252 07/12/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.23 0.00 0 0
2659 PURBA BARDHAMAN Ketugram - I Central Mechanical KHATUNDI PIPED WATER SUPPLY SCHEME , SM/15154 New New Service connection for Khatundi PWSS TW-2 BILL/02346/2023-2024 BP-2023-24-463 31/01/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.33 0.00 0 0
2660 PURBA BARDHAMAN Ketugram - I Burdwan Division KHATUNDI PIPED WATER SUPPLY SCHEME , SM/15154 New KHATUNDI Piped Water Supply Scheme with sinking of Tube-well, LDS, Construction of 150 cum RCC OHR with 20 mtr. staging height including soil testing, Rising Main, FHTC & construction of switch rooms & boundary walls with gates and land development, drain and internal pathway at different TW site under Ketugram-I Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer JUNIOR ENGINEER R.W.S. BURDWAN SUB-DIVISION PHE DTE ORD/000413/2023-2024 3258/BWD 27/07/2023 300 SUJAN KUMAR MISTRY 260.06 70.25 27.01 60
2661 PURBA BARDHAMAN Ketugram - I Central Mechanical KHATUNDI PIPED WATER SUPPLY SCHEME , SM/15154 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Rajur & others water supply scheme under Ketugram-I Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. Driller In-Charge Junior Engineer ORD/000098/2024-2025 2407/CMD 02/08/2024 90 M.S. ENTERPRISE 82.29 0.00 0 0
2662 PURBA BARDHAMAN Ketugram - I Burdwan Division KHATUNDI PIPED WATER SUPPLY SCHEME , SM/15154 New Balance Work For OHR, Extension Of Pipeline To Provide FHTC With Sinking Of Tube Well, Construction Of Pump House, Boundary Wall, Land Development, Plinth Protection For Pump House, Approach Road & Other Related Work Under Bakalsa, Chakdaha, Ehaipur, Khatundi And Ketugram (Zone-I) Part-A & B PWSS Under Katwa Sub Division, Block- Ketugram-I, Burdwan Division PHE Dte. Assistant Engineer JUNIOR ENGINEER R.W.S. BURDWAN SUB-DIVISION PHE DTE ORD/000288/2024-2025 2741/BWD 12/07/2024 120 M/S M.M. ENTERPRISE 205.15 0.00 0 65
2663 PURBA BARDHAMAN Ketugram - I Central Mechanical KHATUNDI PIPED WATER SUPPLY SCHEME , SM/15154 New Supply & Installation of Submersible Pumping Machinery , Voltage Stabilizer, Chlorination System and Internal House wiring for Tube well no.- 1 & 2 at KHATUNDI Water Supply Scheme [Block - KETUGRAM-1] under CMD, PHE Dte., Dist.- Purba-Bardhaman. Driller In-Charge Junior Engineer ORD/000848/2023-2024 4121/CMD 29/08/2023 30 A.K SIKDAR 20.81 0.72 3.46 91
2664 PURBA BARDHAMAN Ketugram - I Burdwan Division ANKHONA PIPED WATER SUPPLY SCHEME , SM/15157 New Material Requisition To Resource Division RTOR000093/2023-2024 1962/BWD 25/04/2023 Resource Division 2.29 0.00 0 0
2665 PURBA BARDHAMAN Ketugram - I Burdwan Division ANKHONA PIPED WATER SUPPLY SCHEME , SM/15157 New Material Requisition To Resource Division RTOR000211/2023-2024 2155/BWD 10/05/2023 Resource Division 21.50 0.00 0 0
2666 PURBA BARDHAMAN Ketugram - I Central Mechanical ANKHONA PIPED WATER SUPPLY SCHEME , SM/15157 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at ANKHONA Water Supply Scheme [ Block- KETUGRAM-1] under CMD, PHE Dte., Dist.- Purba-Bardhaman. Driller In-Charge Junior Engineer ORD/000859/2023-2024 4127/CMD 29/08/2023 30 M/S, N.G. ENTERPRISES. 27.75 0.00 0 0
2667 PURBA BARDHAMAN Ketugram - I Burdwan Division ANKHONA PIPED WATER SUPPLY SCHEME , SM/15157 New Material Requisition To Resource Division RTOR000643/2023-2024 5109/BWD 23/11/2023 Resource Division 20.84 0.00 0 0
2668 PURBA BARDHAMAN Ketugram - I Central Drilling ANKHONA PIPED WATER SUPPLY SCHEME , SM/15157 New Providing drilling crew and other allied works for construction of Tube Well (250mm X200mm X 114 Mtrs. Depth) by utilising Departmental Machineries for Ankhona W/S Scheme (T/W-I & II) ,Ketugram-I Block under PurbaBardhman District, Central Drilling Division, P.H.E. Dte. Driller In Charge Junior Engineer ORD/000167/2023-2024 1350/CDD 13/09/2023 30 ASHUTOSH DAS & CO 16.59 0.00 0 0
2669 PURBA BARDHAMAN Ketugram - I Central Mechanical ANKHONA PIPED WATER SUPPLY SCHEME , SM/15157 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Rajur & others water supply scheme under Ketugram-I Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. Driller In-Charge Junior Engineer ORD/000098/2024-2025 2407/CMD 02/08/2024 90 M.S. ENTERPRISE 82.29 0.00 0 0
2670 PURBA BARDHAMAN Ketugram - I Central Mechanical ANKHONA PIPED WATER SUPPLY SCHEME , SM/15157 New Quotation for new service connection Ankhona PWSS TW No.1. BILL/00779/2024-2025 BP-2024-25-293 13/09/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 2.99 0.00 0 0
2671 PURBA BARDHAMAN Ketugram - I Central Mechanical ANKHONA PIPED WATER SUPPLY SCHEME , SM/15157 New Quotation for new service connection Ankhona PWSS TW No. 2. BILL/00778/2024-2025 BP-2024-25-294 13/09/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 2.38 0.00 0 0
2672 PURBA BARDHAMAN Ketugram - I Burdwan Division ANKHONA PIPED WATER SUPPLY SCHEME , SM/15157 New Balance work for OHR, extension of pipeline to provide FHTC with sinking of tube well, construction of pump house, boundary wall, land development, plinth protection for pump house, approach road & other related work under Ankhona, Pandugram, Sripur PWSS under Katwa Sub Division, Block- Ketugram-I, Burdwan Division PHE Dte. Assistant Engineer JUNIOR ENGINEER R.W.S. BURDWAN SUB-DIVISION PHE DTE ORD/000286/2024-2025 2738/BWD 12/07/2024 120 PUSPA ENTERPRISE 128.29 0.00 0 75
2673 PURBA BARDHAMAN Ketugram - I Burdwan Division ANKHONA PIPED WATER SUPPLY SCHEME , SM/15157 New Different works related (sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of different capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site) to ANKHONA, PANDUGRAM & SRIPUR Piped Water Supply Scheme under KETUGRAM¿I Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer JUNIOR ENGINEER R.W.S. BURDWAN SUB-DIVISION PHE DTE ORD/000436/2023-2024 3388/BWD 03/08/2023 365 PUSPA ENTERPRISE 989.13 80.30 8.12 50
2674 PURBA BARDHAMAN Ketugram - I Burdwan Division SRIPUR PIPE WATER SUPPLY SCHEME , SM/15158 New Material Requisition To Resource Division RTOR000014/2023-2024 1962/BWD 25/04/2023 Resource Division 1.55 0.00 0 0
2675 PURBA BARDHAMAN Ketugram - I Burdwan Division SRIPUR PIPE WATER SUPPLY SCHEME , SM/15158 New Material Requisition To Resource Division RTOR000325/2023-2024 2197/BWD 12/05/2023 Resource Division 9.91 0.00 0 0
2676 PURBA BARDHAMAN Ketugram - I Burdwan Division SRIPUR PIPE WATER SUPPLY SCHEME , SM/15158 New Material Requisition To Resource Division RTOR000614/2023-2024 4916/BWD 10/11/2023 Resource Division 19.75 0.00 0 0
2677 PURBA BARDHAMAN Ketugram - I Central Drilling SRIPUR PIPE WATER SUPPLY SCHEME , SM/15158 New Providing drilling crew and other allied works for construction of Tube Well ( 250mm X200mm X 114 Mtrs. Depth) by utilising Departmental Machineries for Sripur Scheme (T/W-I & II) , Ketugram-I Block under Purba Bardhaman District, Central Drilling Division, P.H.E. Dte. Driller In Charge Junior Engineer ORD/000159/2023-2024 860/CDD 10/07/2023 30 OSMAN SEKH 16.62 0.00 0 0
2678 PURBA BARDHAMAN Ketugram - I Central Mechanical SRIPUR PIPE WATER SUPPLY SCHEME , SM/15158 New New Service connection at Sripur PWSS TW-1 BILL/02371/2023-2024 BP-2023-24-489 01/02/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 1.49 0.00 0 0
2679 PURBA BARDHAMAN Ketugram - I Central Mechanical SRIPUR PIPE WATER SUPPLY SCHEME , SM/15158 New New service connection at Sripur PWSS TW No.2 BILL/02373/2023-2024 BP-2023-24-490 01/02/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 4.54 0.00 0 0
2680 PURBA BARDHAMAN Ketugram - I Central Mechanical SRIPUR PIPE WATER SUPPLY SCHEME , SM/15158 New NEW SERVICE CONNECTION FOR SRIPUR PWSS PH-2. BILL/00104/2024-2025 BP-2024-25-45 26/04/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 0.76 0.00 0 0
2681 PURBA BARDHAMAN Ketugram - I Central Mechanical SRIPUR PIPE WATER SUPPLY SCHEME , SM/15158 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Rajur & others water supply scheme under Ketugram-I Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. Driller In-Charge Junior Engineer ORD/000098/2024-2025 2407/CMD 02/08/2024 90 M.S. ENTERPRISE 82.29 0.00 0 0
2682 PURBA BARDHAMAN Ketugram - I Central Mechanical SRIPUR PIPE WATER SUPPLY SCHEME , SM/15158 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at SRIPUR Water Supply Scheme [ Block- KETUGRAM-1] under CMD, PHE Dte., Dist.- Purba-Bardhaman. Driller In-Charge Junior Engineer ORD/000862/2023-2024 4129/CMD 29/08/2023 30 M/S, S.S. ENTERPRISE. 27.65 0.00 0 88
2683 PURBA BARDHAMAN Ketugram - I Burdwan Division SRIPUR PIPE WATER SUPPLY SCHEME , SM/15158 New Balance work for OHR, extension of pipeline to provide FHTC with sinking of tube well, construction of pump house, boundary wall, land development, plinth protection for pump house, approach road & other related work under Ankhona, Pandugram, Sripur PWSS under Katwa Sub Division, Block- Ketugram-I, Burdwan Division PHE Dte. Assistant Engineer JUNIOR ENGINEER R.W.S. BURDWAN SUB-DIVISION PHE DTE ORD/000286/2024-2025 2738/BWD 12/07/2024 120 PUSPA ENTERPRISE 128.29 0.00 0 75
2684 PURBA BARDHAMAN Ketugram - I Burdwan Division SRIPUR PIPE WATER SUPPLY SCHEME , SM/15158 New Different works related (sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of different capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site) to ANKHONA, PANDUGRAM & SRIPUR Piped Water Supply Scheme under KETUGRAM¿I Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer JUNIOR ENGINEER R.W.S. BURDWAN SUB-DIVISION PHE DTE ORD/000436/2023-2024 3388/BWD 03/08/2023 365 PUSPA ENTERPRISE 989.13 57.48 5.81 50
2685 PURBA BARDHAMAN Mangolkote Burdwan Division UNIATATARPUR PIPED WATER SUPPLY SCHEME , SM/15133 New Material Requisition To Resource Division RTOR000332/2023-2024 2197/BWD 12/05/2023 Resource Division 10.34 0.00 0 0
2686 PURBA BARDHAMAN Mangolkote Burdwan Division UNIATATARPUR PIPED WATER SUPPLY SCHEME , SM/15133 New Material Requisition To Resource Division RTOR000458/2023-2024 3982/BWD 08/09/2023 Resource Division 2.76 0.00 0 0
2687 PURBA BARDHAMAN Mangolkote Burdwan Division UNIATATARPUR PIPED WATER SUPPLY SCHEME , SM/15133 New Material Requisition To Resource Division RTOR000700/2023-2024 5070/BWD 23/11/2023 Resource Division 20.46 0.00 0 0
2688 PURBA BARDHAMAN Mangolkote Central Mechanical UNIATATARPUR PIPED WATER SUPPLY SCHEME , SM/15133 New Quotation for New service connection for Unitatarpur PWSS PH 2 BILL/00248/2024-2025 BP-2024-25-126 31/05/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.78 0.00 0 0
2689 PURBA BARDHAMAN Mangolkote Central Mechanical UNIATATARPUR PIPED WATER SUPPLY SCHEME , SM/15133 New Quotation for new service connection for Unitatarpur PWSS PH-1 BILL/00247/2024-2025 BP-2024-25-127 31/05/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 4.22 0.00 0 0
2690 PURBA BARDHAMAN Mangolkote Central Mechanical UNIATATARPUR PIPED WATER SUPPLY SCHEME , SM/15133 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at UNIATATARPUR Water Supply Scheme [ Block- MONGOLKOTE] under CMD, PHE Dte., Dist.- Purba-Bardhaman. Driller In-Charge Junior Engineer ORD/000824/2023-2024 4101/CMD 29/08/2023 30 CHOUDHURY ENTERPRISE 26.93 0.00 0 48
2691 PURBA BARDHAMAN Mangolkote Burdwan Division UNIATATARPUR PIPED WATER SUPPLY SCHEME , SM/15133 New Balance work for OHR, extension of pipeline to provide FHTC in Barulia & Narayanpur mouza with Sinking of Tube well, Construction of Pump house, Boundary Wall, Land Development, Plinth Protection for pump house & OHR under, approach road to 2nd pump house UNIATATARPUR PWSS, Katwa Sub Division, Block- Mongolkote, Burdwan Division PHE Dte. Assistant Engineer JUNIOR ENGINEER KATWA SUB-DIVISION PHE DTE ORD/000504/2024-2025 3162/BWD 22/08/2024 120 POWER TOOLS & ENGINEERING 152.52 0.00 0 0
2692 PURBA BARDHAMAN Mangolkote Burdwan Division UNIATATARPUR PIPED WATER SUPPLY SCHEME , SM/15133 New Different works related (sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of different capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site) to DEULIA, GOBARDHANPUR, KHARIJA-KASHIGRAM & UNIATATARPUR Piped Water Supply Scheme under Mangolkote Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer JUNIOR ENGINEER KATWA SUB-DIVISION PHE DTE ORD/000477/2023-2024 3491/BWD 09/08/2023 815 POWER TOOLS & ENGINEERING 1,741.05 0.00 0 10
2693 PURBA BARDHAMAN Mangolkote Burdwan Division UNIATATARPUR PIPED WATER SUPPLY SCHEME , SM/15133 New Material Requisition To Resource Division RTOR000088/2024-2025 414/BWD 17/01/2025 Resource Division 3.41 0.00 0 0
2694 PURBA BARDHAMAN Mangolkote Central Mechanical UNIATATARPUR PIPED WATER SUPPLY SCHEME , SM/15133 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Lakshimpur & others water supply scheme under Mangalkote Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman Driller In-Charge Junior Engineer ORD/000097/2024-2025 2406/CMD 02/08/2024 290 CHOUDHURY ENTERPRISE 57.65 0.00 0 10
2695 PURBA BARDHAMAN Ketugram - I Burdwan Division MAHULA PIPED WATER SUPPLY SCHEME , SM/16025 New Material Requisition To Resource Division RTOR000052/2023-2024 1962/BWD 25/04/2023 Resource Division 2.27 0.00 0 0
2696 PURBA BARDHAMAN Ketugram - I Burdwan Division MAHULA PIPED WATER SUPPLY SCHEME , SM/16025 New Material Requisition To Resource Division RTOR000337/2023-2024 2197/BWD 12/05/2023 Resource Division 9.89 0.00 0 0
2697 PURBA BARDHAMAN Ketugram - I Central Mechanical MAHULA PIPED WATER SUPPLY SCHEME , SM/16025 New Supply & Installation of Submersible Pumping Machinery , Voltage Stabilizer, Chlorination system and internal House wiring for Tube well no.- 1 & 2 at MAHULA [KETUGRAM-I] Water Supply Scheme under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000882/2023-2024 4145/CMD 29/08/2023 30 P.K. ENGINEERING 21.40 0.00 0 0
2698 PURBA BARDHAMAN Ketugram - I Burdwan Division MAHULA PIPED WATER SUPPLY SCHEME , SM/16025 New Material Requisition To Resource Division RTOR000626/2023-2024 4872/BWD 10/11/2023 Resource Division 29.60 0.00 0 0
2699 PURBA BARDHAMAN Ketugram - I Central Drilling MAHULA PIPED WATER SUPPLY SCHEME , SM/16025 New Providing drilling crew and other allied works for construction of Tube Well (250mm X200mm X 114 Mtrs. Depth) by utilizing Departmental Machineries for Mahula W/S Scheme (T/W-I & II) , Ketugram-I Block under Purba Bardhman District, Central Drilling Division, P.H.E. Dte. Driller In Charge Junior Engineer ORD/000161/2023-2024 1057/CDD 16/08/2023 30 C.M. ENTERPRISE 16.20 0.00 0 0
2700 PURBA BARDHAMAN Ketugram - I Central Mechanical MAHULA PIPED WATER SUPPLY SCHEME , SM/16025 New Quotation for new service connection at Mahula PWSS PH-I. BILL/00344/2024-2025 BP-2024-25-173 01/07/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.02 0.00 0 0
2701 PURBA BARDHAMAN Ketugram - I Central Mechanical MAHULA PIPED WATER SUPPLY SCHEME , SM/16025 New Quotation for new service connection at Mahula PWSS PH-2. BILL/00350/2024-2025 BP-2024-25-172 01/07/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 4.31 0.00 0 0
2702 PURBA BARDHAMAN Ketugram - I Central Mechanical MAHULA PIPED WATER SUPPLY SCHEME , SM/16025 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Rajur & others water supply scheme under Ketugram-I Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. Driller In-Charge Junior Engineer ORD/000098/2024-2025 2407/CMD 02/08/2024 90 M.S. ENTERPRISE 82.29 0.00 0 0
2703 PURBA BARDHAMAN Ketugram - I Burdwan Division MAHULA PIPED WATER SUPPLY SCHEME , SM/16025 New MAHULA Piped Water Supply Scheme with sinking of Tube-well, LDS, Construction of 150 cum RCC OHR with 20 mtr. staging height including soil testing, Rising Main, FHTC & construction of switch rooms & boundary walls with gates and land development, drain and internal pathway at different TW site under Ketugram-I Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer JUNIOR ENGINEER R.W.S. BURDWAN SUB-DIVISION PHE DTE ORD/000431/2023-2024 3665/BWD 22/08/2023 300 SUJATA CONSTRUCTION 262.37 0.00 0 3
2704 PURBA BARDHAMAN Ketugram - I Burdwan Division MAHULA PIPED WATER SUPPLY SCHEME , SM/16025 New Balance work for OHR, extension of pipeline to provide FHTC with sinking of tube well, construction of pump house, boundary wall, land development, plinth protection for pump house, approach road & other related work under Chakta, Mahula, Rajoor and Srigram PWSS under Katwa Sub Division, Block- Ketugram-I, Burdwan Division PHE Dte. Assistant Engineer JUNIOR ENGINEER R.W.S. BURDWAN SUB-DIVISION PHE DTE ORD/000284/2024-2025 2721/BWD 11/07/2024 120 ESCON INDIA 139.35 0.00 0 70
2705 PURBA BARDHAMAN Kalna - II Burdwan Division BIRUHA PIPED WATER SUPPLY SCHEME , SM/16287 New Material Requisition To Resource Division RTOR000070/2023-2024 1962/BWD 25/04/2023 Resource Division 12.79 0.00 0 0
2706 PURBA BARDHAMAN Kalna - II Burdwan Division BIRUHA PIPED WATER SUPPLY SCHEME , SM/16287 New Material Requisition To Resource Division RTOR000263/2023-2024 2197/BWD 12/05/2023 Resource Division 17.53 0.00 0 0
2707 PURBA BARDHAMAN Kalna - II Central Mechanical BIRUHA PIPED WATER SUPPLY SCHEME , SM/16287 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at BIRUHA Water Supply Scheme [ Block- KALNA-2] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000896/2023-2024 4159/CMD 29/08/2023 30 J.S. CONSTRUCTION. 28.48 0.00 0 0
2708 PURBA BARDHAMAN Kalna - II Burdwan Division BIRUHA PIPED WATER SUPPLY SCHEME , SM/16287 New Material Requisition To Resource Division RTOR000608/2023-2024 4913/BWD 10/11/2023 Resource Division 35.77 0.00 0 0
2709 PURBA BARDHAMAN Kalna - II Central Mechanical BIRUHA PIPED WATER SUPPLY SCHEME , SM/16287 New New electric connection for Biruha PWSS, PH-1. BILL/01870/2023-2024 BP-2023-24-354 11/01/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 5.00 0.00 0 0
2710 PURBA BARDHAMAN Kalna - II Central Mechanical BIRUHA PIPED WATER SUPPLY SCHEME , SM/16287 New New electric connection for Biruha PWSS, PH-2. BILL/01871/2023-2024 BP-2023-24-355 11/01/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 5.94 0.00 0 0
2711 PURBA BARDHAMAN Kalna - II Burdwan Division BIRUHA PIPED WATER SUPPLY SCHEME , SM/16287 New Work Order for "CONSTRUCTION OF TEMPORARY KIOSK FOR THE NECESSARY ARRANGEMENT OF ELECTRIFICATION OF TUBEWELL FOR BIRUHA PWSS UNDER KALNA SUB-DIVISION UNDER BURDWAN DIVISION, PHE DTE." Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/001147/2023-2024 2096/KSD 04/03/2024 10 ER CONSTRUCTION & GENERAL ORDER SUPPLIER 0.66 0.00 0 2
2712 PURBA BARDHAMAN Kalna - II Central Mechanical BIRUHA PIPED WATER SUPPLY SCHEME , SM/16287 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Khargakur & others water supply scheme under Kalna-2 Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000116/2024-2025 2393/CMD 02/08/2024 280 HANNAN BUILDERS PVT LTD 76.80 0.00 0 20
2713 PURBA BARDHAMAN Kalna - II Burdwan Division BIRUHA PIPED WATER SUPPLY SCHEME , SM/16287 New Different works related (sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of different capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site) to AKALPAUSH & BIRUHA Piped Water Supply Scheme under Kalna ¿ II Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000542/2023-2024 3698/BWD 24/08/2023 365 SUPRITI ENTERPRISE 1,010.87 72.15 7.14 37
2714 PURBA BARDHAMAN Kalna - II Burdwan Division BIRUHA PIPED WATER SUPPLY SCHEME , SM/16287 New Work order for "Restoration of pipeline with other allied works at different places of Bardalia,Masidpur,Biruha,Mainagari mouja under Birhua Pwss due to construction of rcc cover drain & widening of rcc concrete road constructed by PRI body under Kalna-II panchayat samiti under Kalna Sub-Division under Burdwan Division, PHE Dte." Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000860/2024-2025 1845/KSD 27/11/2024 15 SUPRITI ENTERPRISE 2.89 0.00 0 0
2715 PURBA BARDHAMAN Kalna - II Burdwan Division BIRUHA PIPED WATER SUPPLY SCHEME , SM/16287 New Pipeline laying by HDD method and different types of balance works in connection with different Augmentation & New Scheme [(SM/ 08103), (SM/13413), (SM/15587), (SM/16035), (SM/16287), (SM/16029), (SM/15581), (SM/14437), (SM/16028), (SM/16036) & (SM/14425)] within Kalna Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer ORD/001270/2024-2025 849/BWD 05/03/2025 180 S.P. CONSTRUCTION 683.30 0.00 0 0
2716 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF NADANGHAT PIPED WATER SUPPLY SCHEME , SM/16298 Augmentation Augmentation of NADANGHAT PWSS to accommodate FHTC, Laying Distribution System, Laying Rising Main, under Jal Jeevan Mission of Purbasthali - I Block, Purba Burdwan District under Burdwan Division, PHE. Dte. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000077/2023-2024 2043/BWD 03/05/2023 60 HAFIJUR RAHAMAN MIDYA 26.28 20.80 79.15 100
2717 PURBA BARDHAMAN Central Mechanical AUGMENTATION OF NADANGHAT PIPED WATER SUPPLY SCHEME , SM/16298 Augmentation Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination system and internal House wiring for Tube well no.- 1 & 2 at Augmentation of NADANGHAT[PURBASTHALI-I] Water Supply Scheme under CMD, PHE Dte., Dist.- Purba-Bardhaman. ORD/001082/2023-2024 4440/CMD 04/10/2023 30 S.K. ENTERPRISE 24.39 0.00 0 0
2718 PURBA BARDHAMAN Central Mechanical AUGMENTATION OF NADANGHAT PIPED WATER SUPPLY SCHEME , SM/16298 Augmentation Quotation for load enhancement at Nadanghat PWSS PH 2. BILL/00225/2024-2025 BP-2024-25-116 28/05/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 0.89 0.00 0 0
2719 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF NADANGHAT PIPED WATER SUPPLY SCHEME , SM/16298 Augmentation Laying of Rising Main and distribution system with FHTC work, sinking of tube wells with other allied works in connection with Augmentation of NADANGHAT Piped Water Supply Scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer ORD/000130/2024-2025 2066/BWD 07/06/2024 120 TIRUPATI ENTERPRISES 272.43 0.00 0 0
2720 PURBA BARDHAMAN Central Mechanical AUGMENTATION OF NADANGHAT PIPED WATER SUPPLY SCHEME , SM/16298 Augmentation Illumination arrangement at Nadanghat water supply scheme under Purbasthali-1 Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000403/2024-2025 2782/CMD 01/10/2024 60 SUBRATA BHADRA 16.18 0.00 0 0
2721 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF NADANGHAT PIPED WATER SUPPLY SCHEME , SM/16298 Augmentation Work Order for "Restoration and laying of HDPE Pipeline at 2nd Pump House adjacent to Dogachhia village of DOGACHHIA PWSS & Nadanghat PWSS (SM/16298) under Kalna Sub-Division under Burdwan Division, PHE Dte.". Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000554/2024-2025 774/KSD 12/07/2024 15 HAMID SK 0.96 0.92 95.83 100
2722 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF NADANGHAT PIPED WATER SUPPLY SCHEME , SM/16298 Augmentation Work Order for "Restoration and laying of HDPE Pipeline at 2nd Pump House adjacent to Parulia village of PARULIA PWSS & Nadanghat PWSS (SM/16298) under Kalna Sub-Division under Burdwan Division, PHE Dte." Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000553/2024-2025 773/KSD 12/07/2024 15 HAMID SK 0.96 0.46 47.92 100
2723 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF NADANGHAT PIPED WATER SUPPLY SCHEME , SM/16298 Augmentation Conducting physical Household Survey at the IMIS reported village for HGJ certification and providing balance FHTC for Har Ghar Jal certification including conducting Gram Sabhas for different IMIS reported villages across the district under Burdwan Division, PHE Dte. AE(HQs),Assistant Engineer ,Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE.,Assistant Engineer, Durgapur Sub Division, P.H.E. Dte JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000428/2024-2025 3107/BWD 12/08/2024 90 TUBGRAM GRAMMYAK UNNAYAN SAMITY 309.60 0.00 0 50
2724 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF NADANGHAT PIPED WATER SUPPLY SCHEME , SM/16298 Augmentation Supply & Laying of 300mm Dia M.S.E.R.W Pipe including Jack Pushing along with other allied work in connection with different Augmentation & New [(SM/18439, SM/14437, SM/14435, SM/07805, SM/14440, SM/15571, SM/08030, SM/16014, SM/15588, SM/16298 & SM/16307)] under Kalna Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/001187/2024-2025 608/BWD 11/02/2025 180 MANASH GHOSH 1,209.62 0.00 0 0
2725 PURBA BARDHAMAN Kalna - II Burdwan Division KHARGAKUR PIPED WATER SUPPLY SCHEME , SM/16035 New Material Requisition To Resource Division RTOR000382/2023-2024 2197/BWD 12/05/2023 Resource Division 14.20 0.00 0 0
2726 PURBA BARDHAMAN Kalna - II Burdwan Division KHARGAKUR PIPED WATER SUPPLY SCHEME , SM/16035 New Material Requisition To Resource Division RTOR000399/2023-2024 3842/BWD 01/09/2023 Resource Division 6.91 0.00 0 0
2727 PURBA BARDHAMAN Kalna - II Burdwan Division KHARGAKUR PIPED WATER SUPPLY SCHEME , SM/16035 New Material Requisition To Resource Division RTOR000538/2023-2024 4305/BWD 29/09/2023 Resource Division 25.37 0.00 0 0
2728 PURBA BARDHAMAN Kalna - II Central Mechanical KHARGAKUR PIPED WATER SUPPLY SCHEME , SM/16035 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at KHARGAKUR Water Supply Scheme [ Block- KALNA-2] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ORD/000893/2023-2024 4156/CMD 29/08/2023 30 S.K. ELECTRICALS 26.96 0.00 0 0
2729 PURBA BARDHAMAN Kalna - II Central Mechanical KHARGAKUR PIPED WATER SUPPLY SCHEME , SM/16035 New Quotation for new electric service connection at Khargakur PH NO.-2 BILL/01745/2023-2024 BP-2023-24-256 07/12/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 4.28 0.00 0 0
2730 PURBA BARDHAMAN Kalna - II Central Mechanical KHARGAKUR PIPED WATER SUPPLY SCHEME , SM/16035 New Quotation for new electric service connection at Khargakur PH NO.-1 BILL/01746/2023-2024 BP-2023-24-257 07/12/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 4.35 0.00 0 0
2731 PURBA BARDHAMAN Kalna - II Burdwan Division KHARGAKUR PIPED WATER SUPPLY SCHEME , SM/16035 New KHARGAKUR PWSS Piped Water Supply Scheme with sinking of Tube-well, LDS, Rising Main, FHTC, Construction of 150 cum capacity RCC OHR with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drain and internal pathway at different TW site under Kalna-II Block, District:- Purba-Bardhaman [NEW SCHEME]_2ND CALL Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000556/2023-2024 3751/BWD 28/08/2023 365 MITRA CONSTRUCTION 310.02 62.30 20.1 15
2732 PURBA BARDHAMAN Kalna - II Burdwan Division KHARGAKUR PIPED WATER SUPPLY SCHEME , SM/16035 New Work Order for "CONSTRUCTION OF TEMPORARY KIOSK FOR THE NECESSARY ARRANGEMENT OF ELECTRIFICATION OF TUBEWELL FOR KHAGRAKUR PWSS UNDER KALNA SUB-DIVISION UNDER BURDWAN DIVISION, PHE DTE." Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/001155/2023-2024 2171/KSD 11/03/2024 10 MITRA CONSTRUCTION 0.66 0.00 0 100
2733 PURBA BARDHAMAN Kalna - II Central Mechanical KHARGAKUR PIPED WATER SUPPLY SCHEME , SM/16035 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Khargakur & others water supply scheme under Kalna-2 Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000116/2024-2025 2393/CMD 02/08/2024 280 HANNAN BUILDERS PVT LTD 76.80 0.00 0 20
2734 PURBA BARDHAMAN Kalna - II Burdwan Division KHARGAKUR PIPED WATER SUPPLY SCHEME , SM/16035 New Pipeline laying by HDD method and different types of balance works in connection with different Augmentation & New Scheme [(SM/ 08103), (SM/13413), (SM/15587), (SM/16035), (SM/16287), (SM/16029), (SM/15581), (SM/14437), (SM/16028), (SM/16036) & (SM/14425)] within Kalna Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer ORD/001270/2024-2025 849/BWD 05/03/2025 180 S.P. CONSTRUCTION 683.30 0.00 0 0
2735 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR GOBINDAPUR , SM/15722 Augmentation Preparation and Submission of DPR for Augmentation of Gobindapur PWSS under Memari-I Development Block under Burdwan Division, P.H.E Dte.[2nd Call] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000366/2023-2024 1529/BSD 17/07/2023 15 CARTO 0.78 0.38 48.72 100
2736 PURBA BARDHAMAN Central Mechanical AUGMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR GOBINDAPUR , SM/15722 Augmentation Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.- 4 at Augmentation of GOBINDAPUR Water Supply Scheme [BLOCK- MEMARI-I] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER Junior Engineer ORD/001610/2023-2024 1538/CMD 05/03/2024 60 BEHERA ENTERPRISE 12.33 0.00 0 0
2737 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR GOBINDAPUR , SM/15722 Augmentation Extension of PVC water supply line for GOBINDAPUR and its adjoining Mouza W/S Scheme, Block-Memari-I within Burdwan Sub-Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. Junior Engineer, RWS, Memari-I Dev. Bolck ORD/000623/2023-2024 3920/BWD 05/09/2023 30 J K CORPORATION 27.92 11.78 42.19 98
2738 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR GOBINDAPUR , SM/15722 Augmentation Conducting physical Household Survey at the IMIS reported village for HGJ certification and providing balance FHTC for Har Ghar Jal certification including conducting Gram Sabhas for different IMIS reported villages across the district under Burdwan Division, PHE Dte. AE(HQs),Assistant Engineer ,Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE.,Assistant Engineer, Durgapur Sub Division, P.H.E. Dte JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000428/2024-2025 3107/BWD 12/08/2024 90 TUBGRAM GRAMMYAK UNNAYAN SAMITY 309.60 0.00 0 50
2739 PURBA BARDHAMAN Central Mechanical Solarisation of WBSEDCL energised electrical installation at PWSS at different Blocks under Central Mechanical Division,PHED District Purba Bardhaman , SM/17188 New solar connection for Parulia PWSS . BILL/02403/2023-2024 BP-2023-24-576 27/02/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 0.31 0.00 0 0
2740 PURBA BARDHAMAN Central Mechanical Solarisation of WBSEDCL energised electrical installation at PWSS at different Blocks under Central Mechanical Division,PHED District Purba Bardhaman , SM/17188 New solar connection for Patuli PWSS . BILL/02402/2023-2024 BP-2023-24-575 27/02/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 0.32 0.00 0 0
2741 PURBA BARDHAMAN Central Mechanical Solarisation of WBSEDCL energised electrical installation at PWSS at different Blocks under Central Mechanical Division,PHED District Purba Bardhaman , SM/17188 Quotation for load enhancement of Mugura PWSS (Solar) BILL/00231/2024-2025 BP-2024-25-123 29/05/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 0.20 0.00 0 0
2742 PURBA BARDHAMAN Central Mechanical Solarisation of WBSEDCL energised electrical installation at PWSS at different Blocks under Central Mechanical Division,PHED District Purba Bardhaman , SM/17188 Quotation for load enhancement of Natu PWSS (Solar) BILL/00233/2024-2025 BP-2024-25-124 29/05/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 0.21 0.00 0 0
2743 PURBA BARDHAMAN Central Mechanical Solarisation of WBSEDCL energised electrical installation at PWSS at different Blocks under Central Mechanical Division,PHED District Purba Bardhaman , SM/17188 Quotation for for application fee for new smart export import meter for a new solar plant at Khandaghosh PH-I PWSS (Solar) BILL/00234/2024-2025 BP-2024-25-122 29/05/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 0.01 0.00 0 0
2744 PURBA BARDHAMAN Central Mechanical Solarisation of WBSEDCL energised electrical installation at PWSS at different Blocks under Central Mechanical Division,PHED District Purba Bardhaman , SM/17188 Quotation for load enhancement of Tendual PWSS (Solar) BILL/00232/2024-2025 BP-2024-25-125 29/05/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 0.33 0.00 0 0
2745 PURBA BARDHAMAN Central Mechanical Solarisation of WBSEDCL energised electrical installation at PWSS at different Blocks under Central Mechanical Division,PHED District Purba Bardhaman , SM/17188 Electric quotation for installation of Solar Power plant at Sasinara W/S Zone-I BILL/00313/2024-2025 BP-2024-25-153 21/06/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 0.01 0.00 0 0
2746 PURBA BARDHAMAN Central Mechanical Solarisation of WBSEDCL energised electrical installation at PWSS at different Blocks under Central Mechanical Division,PHED District Purba Bardhaman , SM/17188 Application fees for connectivity of solar plant metering system at Kaithan W/W No.-1 Sadarghat BILL/00375/2024-2025 BP-2024-25-185 08/07/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 0.01 0.00 0 0
2747 PURBA BARDHAMAN Central Mechanical Solarisation of WBSEDCL energised electrical installation at PWSS at different Blocks under Central Mechanical Division,PHED District Purba Bardhaman , SM/17188 Quotation for Solar power plant at NATU PWSS (Solar). BILL/00394/2024-2025 BP-2024-25-210 18/07/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 0.01 0.00 0 0
2748 PURBA BARDHAMAN Central Mechanical Solarisation of WBSEDCL energised electrical installation at PWSS at different Blocks under Central Mechanical Division,PHED District Purba Bardhaman , SM/17188 Quotation for solar power plant at Mugura PWSS. BILL/00387/2024-2025 BP-2024-25-211 18/07/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 0.01 0.00 0 0
2749 PURBA BARDHAMAN Central Mechanical Solarisation of WBSEDCL energised electrical installation at PWSS at different Blocks under Central Mechanical Division,PHED District Purba Bardhaman , SM/17188 Quotation for Solar power plant at Tendul PWSS (Solar). BILL/00393/2024-2025 BP-2024-25-209 18/07/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 0.01 0.00 0 0
2750 PURBA BARDHAMAN Central Mechanical Solarisation of WBSEDCL energised electrical installation at PWSS at different Blocks under Central Mechanical Division,PHED District Purba Bardhaman , SM/17188 Application for Solar power plant at Sasinara Zone-I, TW 1 BILL/00444/2024-2025 BP-2024-25-233 30/07/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 0.01 0.00 0 0
2751 PURBA BARDHAMAN Central Mechanical Solarisation of WBSEDCL energised electrical installation at PWSS at different Blocks under Central Mechanical Division,PHED District Purba Bardhaman , SM/17188 Quotation for Solarization of the Ketugram PWSS (HW site) BILL/01835/2024-2025 null 21/03/2025 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 0.01 0.00 0 null
2752 PURBA BARDHAMAN Central Mechanical Solarisation of WBSEDCL energised electrical installation at PWSS at different Blocks under Central Mechanical Division,PHED District Purba Bardhaman , SM/17188 WBSEDCL Application fees for the installation of import/export energy meter (solar) at Ramkrishnapur Pwss, P/H-I BILL/01826/2024-2025 null 21/03/2025 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 0.01 0.00 0 null
2753 PURBA BARDHAMAN Central Mechanical Solarisation of WBSEDCL energised electrical installation at PWSS at different Blocks under Central Mechanical Division,PHED District Purba Bardhaman , SM/17188 Quotation for Solarization of Baharan PWSS(HW site) BILL/01828/2024-2025 null 21/03/2025 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 0.01 0.00 0 null
2754 PURBA BARDHAMAN Central Mechanical Solarisation of WBSEDCL energised electrical installation at PWSS at different Blocks under Central Mechanical Division,PHED District Purba Bardhaman , SM/17188 WBSEDCL SOLAR QUOTATION BILL/01880/2024-2025 null 24/03/2025 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 0.22 0.00 0 null
2755 PURBA BARDHAMAN Central Mechanical Solarisation of WBSEDCL energised electrical installation at PWSS at different Blocks under Central Mechanical Division,PHED District Purba Bardhaman , SM/17188 WBSEDCL SOLAR QUOTATION BILL/01879/2024-2025 null 24/03/2025 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 0.22 0.00 0 null
2756 PURBA BARDHAMAN Central Mechanical Solarisation of WBSEDCL energised electrical installation at PWSS at different Blocks under Central Mechanical Division,PHED District Purba Bardhaman , SM/17188 Solarisation of WBSEDCL energised electrical installations of PWSS of different Blocks in the district Purba Bardhaman under Central Mechanical Division, PHE Dte. ASSISTANT ENGINEER,Driller In-Charge Junior Engineer ORD/000131/2023-2024 2693/CMD 23/06/2023 180 A K INDUSTRIES 203.81 98.91 48.53 100
2757 PURBA BARDHAMAN Central Mechanical Solarisation of WBSEDCL energised electrical installation at PWSS at different Blocks under Central Mechanical Division,PHED District Purba Bardhaman , SM/17188 Wbsedcl Quotation for installation of import /export meter (Solar) at Rasulpur Pwss Ph-01 BILL/00062/2025-2026 null 21/04/2025 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 0.15 0.00 0 null
2758 PURBA BARDHAMAN Central Mechanical Solarisation of WBSEDCL energised electrical installation at PWSS at different Blocks under Central Mechanical Division,PHED District Purba Bardhaman , SM/17188 Wbsedcl Quotation for installation of import /export meter (Solar) at Sasinara zone-1 Pwss Ph-01 BILL/00063/2025-2026 null 21/04/2025 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 0.22 0.00 0 null
2759 PURBA BARDHAMAN Central Mechanical Solarisation of WBSEDCL energised electrical installation at PWSS at different Blocks under Central Mechanical Division,PHED District Purba Bardhaman , SM/17188 Wbsedcl Quotation for installation of import /export meter (Solar) at Nabagram Pwss Ph-01 BILL/00064/2025-2026 null 21/04/2025 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 0.43 0.00 0 null
2760 PURBA BARDHAMAN Burdwan - I Burdwan Division BARASAT PIPED WATER SUPPLY SCHEME , SM/13906 New Material Requisition To Resource Division RTOR000092/2023-2024 1962/BWD 25/04/2023 Resource Division 7.63 0.00 0 0
2761 PURBA BARDHAMAN Burdwan - I Burdwan Division BARASAT PIPED WATER SUPPLY SCHEME , SM/13906 New Material Requisition To Resource Division RTOR000239/2023-2024 2197/BWD 12/05/2023 Resource Division 12.22 0.00 0 0
2762 PURBA BARDHAMAN Burdwan - I Central Mechanical BARASAT PIPED WATER SUPPLY SCHEME , SM/13906 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at Barasat Water Supply Scheme [ Block- Burdwan-1 ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER Junior Engineer ORD/000652/2023-2024 3995/CMD 29/08/2023 30 JAGANNATH ENTERPRISE 28.95 0.00 0 0
2763 PURBA BARDHAMAN Burdwan - I Burdwan Division BARASAT PIPED WATER SUPPLY SCHEME , SM/13906 New Material Requisition To Resource Division RTOR000710/2023-2024 5040/BWD 23/11/2023 Resource Division 20.46 0.00 0 0
2764 PURBA BARDHAMAN Burdwan - I Central Mechanical BARASAT PIPED WATER SUPPLY SCHEME , SM/13906 New New service connection charges for Barasat PWSS TW-2 BILL/02204/2023-2024 BP-2023-24-394 17/01/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 5.63 0.00 0 0
2765 PURBA BARDHAMAN Burdwan - I Central Mechanical BARASAT PIPED WATER SUPPLY SCHEME , SM/13906 New New service connection charges for Barasat PWSS TW-1 BILL/02203/2023-2024 BP-2023-24-393 17/01/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 4.59 0.00 0 0
2766 PURBA BARDHAMAN Burdwan - I Central Mechanical BARASAT PIPED WATER SUPPLY SCHEME , SM/13906 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at MALKITA & others water supply scheme under Bardhaman-I Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman ASSISTANT ENGINEER Junior Engineer ORD/000066/2024-2025 2388/CMD 02/08/2024 90 ELECTRICAL & MECHANICAL ENGINEERING CORPORATION 55.95 0.00 0 0
2767 PURBA BARDHAMAN Burdwan - I Burdwan Division BARASAT PIPED WATER SUPPLY SCHEME , SM/13906 New Material Requisition To Resource Division RTOR000092/2024-2025 418/BWD 17/01/2025 Resource Division 1.32 0.00 0 0
2768 PURBA BARDHAMAN Burdwan - I Burdwan Division BARASAT PIPED WATER SUPPLY SCHEME , SM/13906 New Different works related (sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of different capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site) to BARASAT, JAGADABAD & KHAIDYA Piped Water Supply Scheme under BURDWAN-I Block, District:- Purba Bardhaman [NEW SCHEME] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. J.E. 1 BURDWAN ORD/000465/2023-2024 3460/BWD 08/08/2023 783 CONCORD EMC ENCLAVE LLP 1,526.24 0.00 0 45
2769 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED RADGANAGAR BAGHANAPARA PWSS TO ACCOMMODATE FHTC IN KALNA I BLOCK UNDER KALNA SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/09873 Augmentation Preparation of DPR for augmentation of Radhanagar-Baghnapara W/S Scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. (Sl No-B) Assistant Engineer ORD/000579/2021-2022 214/KSD 24/02/2022 21 ROY CHOUDHURI CONSTRUCTION 2.96 0.00 0 1
2770 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED RADGANAGAR BAGHANAPARA PWSS TO ACCOMMODATE FHTC IN KALNA I BLOCK UNDER KALNA SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/09873 Augmentation Supply of materials for different water supply scheme under Burdwan Division, PHE Dte. VCH/001578/2021-2022 1207/DW 10/03/2022 EXECUTIVE ENGINEER, RESOURCES DIVISION, P.H.E. DTE. 3,005.00 0.00 0 0
2771 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED RADGANAGAR BAGHANAPARA PWSS TO ACCOMMODATE FHTC IN KALNA I BLOCK UNDER KALNA SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/09873 Augmentation Preparation of DPR for augmentation of Radhanagar-Baghnapara W/S Scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. (Sl No-B) Assistant Engineer ORD/000580/2021-2022 214/KSD 24/02/2022 21 ROY CHOWDHURY ASSOCIATES 2.96 2.95 99.66 0
2772 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED RADGANAGAR BAGHANAPARA PWSS TO ACCOMMODATE FHTC IN KALNA I BLOCK UNDER KALNA SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/09873 Augmentation Material Requisition To Resource Division RTOR000037/2021-2022 537/BWD 27/01/2022 Resource Division 17.54 0.00 0 0
2773 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED RADGANAGAR BAGHANAPARA PWSS TO ACCOMMODATE FHTC IN KALNA I BLOCK UNDER KALNA SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/09873 Augmentation Material Requisition To Resource Division RTOR000221/2021-2022 1544/BWD 15/03/2022 Resource Division 0.37 0.00 0 0
2774 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED RADGANAGAR BAGHANAPARA PWSS TO ACCOMMODATE FHTC IN KALNA I BLOCK UNDER KALNA SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/09873 Augmentation Material Requisition To Resource Division RTOR000193/2021-2022 1375/BWD 09/03/2022 Resource Division 4.85 0.00 0 0
2775 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED RADGANAGAR BAGHANAPARA PWSS TO ACCOMMODATE FHTC IN KALNA I BLOCK UNDER KALNA SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/09873 Augmentation Material Requisition To Resource Division RTOR000018/2022-2023 3277/BWD 29/07/2022 Resource Division 65.16 0.00 0 0
2776 PURBA BARDHAMAN Central Mechanical AUGMENTATION OF GROUND WATER BASED RADGANAGAR BAGHANAPARA PWSS TO ACCOMMODATE FHTC IN KALNA I BLOCK UNDER KALNA SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/09873 Augmentation Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.- 3 at Augumentation of Radhanagar Baghnapara Water Supply Scheme [ BLOCK- Kalna-I ]under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/001643/2023-2024 1625/CMD 15/03/2024 30 JOYGURU ENTERPRISE 12.31 0.00 0 0
2777 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED RADGANAGAR BAGHANAPARA PWSS TO ACCOMMODATE FHTC IN KALNA I BLOCK UNDER KALNA SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/09873 Augmentation Sinking of additional Tube Well, construction of pump house & boundary wall & laying interconnection of RADHANAGAR BAGHNAPARA Piped water supply scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. (PP Site- Khaspur Karim Gachhi). Assistant Engineer Junior Engineer, R.W.S. Burdwan Sub Division, P.H.E. Dt ORD/000882/2023-2024 5483/BWD 13/12/2023 416 MUKHERJEE ENTERPRISE 26.91 0.00 0 45
2778 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED RADGANAGAR BAGHANAPARA PWSS TO ACCOMMODATE FHTC IN KALNA I BLOCK UNDER KALNA SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/09873 Augmentation Augmentation of Radhanagar Baghnapara Piped Water Supply Scheme with LDS, FHTC, Rising main, Construction of 200 cum capacity OHR with 20.0 mtr. Staging height inclusive of soil investigation & repairing of existing 180 cum OHR with repairing of switch rooms, boundary walls at different TW site under Kalna-I Block, District:- Purba-Burdwan Assistant Engineer Junior Engineer, R.W.S. Burdwan Sub Division, P.H.E. Dt ORD/000476/2023-2024 3511/BWD 10/08/2023 365 INDIAN ENGINEERS CO.-OPERATIVE SOCIETY LTD. 458.55 23.66 5.16 65
2779 PURBA BARDHAMAN Katwa - II Burdwan Division MEJHIARI PIPED WATER SUPPLY SCHEME , SM/18456 New Material Requisition To Resource Division RTOR000342/2023-2024 2197/BWD 12/05/2023 Resource Division 10.86 0.00 0 0
2780 PURBA BARDHAMAN Katwa - II Burdwan Division MEJHIARI PIPED WATER SUPPLY SCHEME , SM/18456 New Material Requisition To Resource Division RTOR000410/2023-2024 3870/BWD 01/09/2023 Resource Division 6.49 0.00 0 0
2781 PURBA BARDHAMAN Katwa - II Central Mechanical MEJHIARI PIPED WATER SUPPLY SCHEME , SM/18456 New New service connection charges for Mejhiari PWSS TW-2 BILL/01538/2023-2024 BP-2023-24-208 30/10/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 5.87 0.00 0 0
2782 PURBA BARDHAMAN Katwa - II Burdwan Division MEJHIARI PIPED WATER SUPPLY SCHEME , SM/18456 New Material Requisition To Resource Division RTOR000641/2023-2024 5107/BWD 23/11/2023 Resource Division 20.32 0.00 0 0
2783 PURBA BARDHAMAN Katwa - II Central Mechanical MEJHIARI PIPED WATER SUPPLY SCHEME , SM/18456 New New service connection charges for Mejhiari PWSS TW-1 BILL/01541/2023-2024 BP-2023-24-211 01/11/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 8.05 0.00 0 0
2784 PURBA BARDHAMAN Katwa - II Central Mechanical MEJHIARI PIPED WATER SUPPLY SCHEME , SM/18456 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at MEJHIARI Water Supply Scheme [ Block- KATWA-2] under CMD, PHE Dte., Dist.- Purba-Bardhaman. Driller In-Charge Junior Engineer ORD/000509/2023-2024 3854/CMD 14/08/2023 30 S.K. ELECTRICALS 28.96 0.00 0 90
2785 PURBA BARDHAMAN Katwa - II Central Mechanical MEJHIARI PIPED WATER SUPPLY SCHEME , SM/18456 New Supply & Delivery of Submersible Pumping Machinery, suspension clamp and tube well cover etc. for Tube well No.-2 at MEJHIARI Water Supply Scheme [ Block- KATWA-2] under CMD, PHE Dte.,Dist.- Purba-Bardhaman. Driller In-Charge ORD/001624/2023-2024 352/DIC/BMSD(D) 22/12/2023 7 SUBRATA BHADRA 0.89 0.00 0 0
2786 PURBA BARDHAMAN Katwa - II Central Mechanical MEJHIARI PIPED WATER SUPPLY SCHEME , SM/18456 New Supply & Delivery of Submersible cable and column pipes for Tube Well No No:-2 at MEJHIARI water supply scheme[ Block - KATWA -2] under CMD, PHE Dte,. Dist.- Purba-Bardhaman. Driller In-Charge Junior Engineer ORD/001630/2023-2024 42/DIC/BMSD(D) 15/01/2024 7 SUBRATA BHADRA 0.82 0.00 0 100
2787 PURBA BARDHAMAN Katwa - II Central Mechanical MEJHIARI PIPED WATER SUPPLY SCHEME , SM/18456 New Supply & Delivery of 3 Phase actuator operated wafer type butterfly valve for Tube well No.- 2 at MEJHIARI Water Supply Scheme [Block- KATWA-2] under CMD, PHE Dte., Dist.- Purba-Bardhaman. Driller In-Charge Junior Engineer ORD/001626/2023-2024 24/DIC/BMSD(D) 05/01/2024 7 SUBRATA BHADRA 0.98 0.00 0 99
2788 PURBA BARDHAMAN Katwa - II Central Mechanical MEJHIARI PIPED WATER SUPPLY SCHEME , SM/18456 New Supply & Delivery of Submersible Pumping Machinery, suspension clamp and tube well cover etc. for Tube well No.-2 at MEJHIARI Water Supply Scheme [ Block- KATWA-2] under CMD, PHE Dte.,Dist.- Purba-Bardhaman. Driller In-Charge Junior Engineer ORD/001690/2023-2024 351/DIC/BMSD(D) 22/12/2023 7 SUBRATA BHADRA 0.89 0.00 0 100
2789 PURBA BARDHAMAN Katwa - II Central Mechanical MEJHIARI PIPED WATER SUPPLY SCHEME , SM/18456 New Supply & delivery of valves, starter and Installation of Submersible Pumping Machinery for Tube well No. - 2 at MEJHIARI Water Supply Scheme [ Block- KATWA-2] under CMD, PHE Dte., Dist.· Purba Bardhaman. Driller In-Charge Junior Engineer ORD/001632/2023-2024 46/DIC/BMSD(D) 19/01/2024 15 SUBRATA BHADRA 0.68 0.00 0 100
2790 PURBA BARDHAMAN Katwa - II Central Mechanical MEJHIARI PIPED WATER SUPPLY SCHEME , SM/18456 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Mulgram & others water supply scheme under Katwa-II Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. ASSISTANT ENGINEER Junior Engineer ORD/000070/2024-2025 2409/CMD 02/08/2024 90 DUTTA ENTERPRISE 50.18 0.00 0 0
2791 PURBA BARDHAMAN Katwa - II Burdwan Division MEJHIARI PIPED WATER SUPPLY SCHEME , SM/18456 New Different works related (sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of different capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site) to MEJHIARY & KARUI Piped Water Supply Scheme under Katwa ¿ II Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer JUNIOR ENGINEER KATWA SUB-DIVISION PHE DTE ORD/000421/2023-2024 3291/BWD 31/07/2023 365 M/S S. CHOUDHURY 1,294.79 279.89 21.62 64
2792 PURBA BARDHAMAN Katwa - II Central Mechanical MEJHIARI PIPED WATER SUPPLY SCHEME , SM/18456 New Supply and installation of Electro-Magnetic flow meter at AURIA, KARUI & others water supply scheme under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. Driller In-Charge JUNIOR ENGINEER ORD/000602/2024-2025 3106/CMD 11/12/2024 60 S.K. ELECTRICALS 13.60 0.00 0 0
2793 PURBA BARDHAMAN Katwa - II Burdwan Division MEJHIARI PIPED WATER SUPPLY SCHEME , SM/18456 New Material Requisition To Resource Division RTOR000049/2024-2025 329/BWD 15/01/2025 Resource Division 5.77 0.00 0 0
2794 PURBA BARDHAMAN Katwa - II Burdwan Division MEJHIARI PIPED WATER SUPPLY SCHEME , SM/18456 New Construction of Toilet (1.8 m x 1.8 m) with sanitary arrangement under MAJHIARI PWSS(SM/18456) 2nd Tube Well Site under Katwa Sub-Division under Burdwan Division PHE Dte. (Sl No-05) ORD/001267/2024-2025 346/KTS 05/03/2025 30 GHOSH CONSTRUCTION 2.45 0.00 0 0
2795 PURBA BARDHAMAN Katwa - II Burdwan Division MEJHIARI PIPED WATER SUPPLY SCHEME , SM/18456 New Different types of works involve in connection with implementation of Aug. Mongalkote, Palishgram, Purba Nowapara, Sitahati, Singhi, Mejhiary & Karui Piped Water Supply Scheme within Katwa Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer ORD/001191/2024-2025 873/BWD 06/03/2025 180 M/S S. CHOUDHURY 588.22 0.00 0 0
2796 PURBA BARDHAMAN Galsi - I Burdwan Division PURANGAN PIPED WATER SUPPLY SCHEME , SM/18446 New Material Requisition To Resource Division RTOR000373/2023-2024 2197/BWD 12/05/2023 Resource Division 10.26 0.00 0 0
2797 PURBA BARDHAMAN Galsi - I Burdwan Division PURANGAN PIPED WATER SUPPLY SCHEME , SM/18446 New Material Requisition To Resource Division RTOR000436/2023-2024 3835/BWD 01/09/2023 Resource Division 24.50 0.00 0 0
2798 PURBA BARDHAMAN Galsi - I Burdwan Division PURANGAN PIPED WATER SUPPLY SCHEME , SM/18446 New Material Requisition To Resource Division RTOR000766/2023-2024 192/BWD 10/01/2024 Resource Division 24.50 0.00 0 0
2799 PURBA BARDHAMAN Galsi - I Durgapur W/S Division PURANGAN PIPED WATER SUPPLY SCHEME , SM/18446 New Acceptance cum Formal Work Order for Additional work of Construction of CWR cum Pump House with MS Structural work, Substation, Chlorine Room etc, Laying of MS pipe and necessary allied works of Surface Based Purangan and 11 Nos Mouzas Sub Surface based Pipe W/S Scheme (JJM) under Galsi-I Block, Dist- Purba Bardhaman under Durgapur W/S Division, PHE Dte. Assistant Engineer-II JUNIOR ENGINEER-2 ORD/000124/2024-2025 1112/DWSD 02/08/2024 120 MANASH GHOSH 98.87 0.00 0 0
2800 PURBA BARDHAMAN Galsi - I Durgapur W/S Division PURANGAN PIPED WATER SUPPLY SCHEME , SM/18446 New Formal Work Order for Road Restoration work of PWD Road for laying of Rising Main of 11 Nos Mouzas and Purangan PWSS under Sub Surface Based 11 Nos Mouzas Pipe W/S Scheme (JJM), Galsi-I Block, Dist- Purba Bardhaman under Durgapur W/S Division, PHE Dte. Assistant Engineer-II JUNIOR ENGINEER-2 ORD/000140/2024-2025 1290/DWSD 06/09/2024 95 MANASH GHOSH 216.51 0.00 0 0
2801 PURBA BARDHAMAN Galsi - I Burdwan Division PURANGAN PIPED WATER SUPPLY SCHEME , SM/18446 New Hydro-geological study of Sub Surface Water Flow/Storage Characteristics for Creation of Sustainable Source and Estimation of Sustainable Yield (5 Nos of Schemes) in Purba Bardhaman District, West Bengal towards implementation of water supply project. ORD/000872/2023-2024 5324/BWD 01/12/2023 120 THE REGISTRAR JADAVPUR UNIVERSITY 113.34 0.00 0 100
2802 PURBA BARDHAMAN Galsi - I Central Mechanical PURANGAN PIPED WATER SUPPLY SCHEME , SM/18446 New Quotation for new service connection at Purangan. BILL/01083/2024-2025 BP-2024-25-403 22/11/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 4.32 0.00 0 0
2803 PURBA BARDHAMAN Galsi - I Durgapur W/S Division PURANGAN PIPED WATER SUPPLY SCHEME , SM/18446 New Quotation for new electricity connection for Purbangram PWSS under DWSD PHE Dte BILL/00239/2024-2025 BP-2024-25-111 09/01/2025 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED 11.71 0.00 0 0
2804 PURBA BARDHAMAN Galsi - I Durgapur W/S Division PURANGAN PIPED WATER SUPPLY SCHEME , SM/18446 New Acceptance cum Formal Work Order for Preparation and Submission of Structural Design Calculation (Civil) & Structural drawing of Proposed CWR with M.S Structural Pump House over cwr, WBSEDCL Mettering Room and - PDB Room -2 Nos, Transformer yeard -2 nos, Chlorin Room -1 No with General Arrangement Drawing of Internal Road - Drain & necessary Soil investigation at Intake Site of "PURANGAN (Zone-I, II, III) and 11 Nos. Mouzas PWSS under Durgapur W/s Division, PHE Dte. Assistant Engineer-II JUNIOR ENGINEER-2 ORD/000190/2024-2025 1607/DWSD 26/11/2024 45 MANASH GHOSH 9.46 0.00 0 100
2805 PURBA BARDHAMAN Galsi - I Durgapur W/S Division PURANGAN PIPED WATER SUPPLY SCHEME , SM/18446 New Quotation money for new service connection at PURANGAN PWSS Head work site under DWSD PHE Dte BILL/00279/2024-2025 BP-2024-25-120 04/02/2025 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED 51.44 0.00 0 null
2806 PURBA BARDHAMAN Galsi - I Central Mechanical PURANGAN PIPED WATER SUPPLY SCHEME , SM/18446 New Supply, installation, commissioning of Electro-Mechanical and instrumentation components at newly constructed Boosting Station under Purangan & 11 nos. Mouza water supply scheme under Central Mechanical Division PHE Dte. ASSISTANT ENGINEER Junior Engineer ORD/000774/2024-2025 479/CMD 06/02/2025 75 S.P. CONSTRUCTION 135.24 0.00 0 0
2807 PURBA BARDHAMAN Galsi - I Durgapur W/S Division PURANGAN PIPED WATER SUPPLY SCHEME , SM/18446 New Formal Work Order for Additional work of Soil investigation & construction of CWR/Pump House etc, Land development of H/W Site,drain & internal Path Way, Concrete Road Restoration,FHTC with Platform with necessary allied Works of Sub Surface Based PURANGAN Pipe W/S Scheme (JJM) under Galsi - I Block, Dist - Purba- Bardhaman ,under Durgapur Water Supply Division, PHE Dte. Assistant Engineer-II JUNIOR ENGINEER-2 ORD/000163/2024-2025 1521/DWSD 11/11/2024 180 MANASH GHOSH 789.87 0.00 0 51
2808 PURBA BARDHAMAN Galsi - I Central Mechanical PURANGAN PIPED WATER SUPPLY SCHEME , SM/18446 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for OHR SITE of Zone-1, 2, & 3 at PURANGAN Water Supply Scheme [ BLOCK- Galsi-I ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. Driller In-Charge JUNIOR ENGINEER ORD/000562/2024-2025 3099/CMD 11/12/2024 373 CHOUDHURY ENTERPRISE 38.16 0.00 0 32
2809 PURBA BARDHAMAN Galsi - I Durgapur W/S Division PURANGAN PIPED WATER SUPPLY SCHEME , SM/18446 New Acceptance cum Formal Work Order for the work of Sinking of 3 Nos 300 x 200 mm dia T/W 150 mtr and 5 nos 200 x 200 mm dia River Bank T/W 51 mtr with Construction of 3 nos P/H cum switch room under chlorine room under PURANGAN PWSS (JJM), Block:- Galsi-I , Dist- Purba Bardhaman. Assistant Engineer-I,Assistant Engineer-II JUNIOR ENGINEER-2 ORD/000309/2023-2024 372/DWSD 15/03/2024 90 MANASH GHOSH 90.55 0.00 0 53
2810 PURBA BARDHAMAN Galsi - I Burdwan Division PURANGAN PIPED WATER SUPPLY SCHEME , SM/18446 New Sub Surface Based Piped Water Supply Scheme with LDS, FHTC, Construction of different capacity RCC OHRs with 20.0 mtr. with Staging height including soil investigation, Construction of CWR, Chlorine Room, Guard Room, Sub Station Building, High Lift Pump House Boundary walls with gates, land development, drain and internal pathway of PURANGAN Piped Water Supply Scheme under Galsi-II Block, District:- Purba-Bardhaman [NEW SCHEME]_ 2ND CALL ORD/000459/2023-2024 3441/BWD 08/08/2023 730 MANASH GHOSH 1,312.95 0.00 0 49
2811 PURBA BARDHAMAN Galsi - I Central Mechanical PURANGAN PIPED WATER SUPPLY SCHEME , SM/18446 New Providing Mechanical/Electrical equipment with all ancillaries and auxiliaries including intake (Low lift) pumping machineries, High Lift pumping machineries, 0-1 kg/hour gaseous chlorination system and illumination arrangement of Purangan & 11 nos. mouza Sub-Surface Based Piped Water Supply Scheme under Purba Bardhaman District PHE Dte. ASSISTANT ENGINEER Junior Engineer ORD/000003/2025-2026 905/CMD 04/04/2025 75 WEST BENGAL ENGINEERING CO. 317.99 0.00 0 0
2812 PURBA BARDHAMAN Manteswar Burdwan Division KHANDRA PIPED WATER SUPPLY SCHEME , SM/18505 New Material Requisition To Resource Division RTOR000530/2023-2024 4292/BWD 29/09/2023 Resource Division 68.65 0.00 0 0
2813 PURBA BARDHAMAN Manteswar Central Mechanical KHANDRA PIPED WATER SUPPLY SCHEME , SM/18505 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1, 2 & 3 at KHANDRA Water Supply Scheme [ Block-MONTESWAR] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ORD/000920/2023-2024 4184/CMD 29/08/2023 30 P.K. ENGINEERING 44.74 0.00 0 0
2814 PURBA BARDHAMAN Manteswar Burdwan Division KHANDRA PIPED WATER SUPPLY SCHEME , SM/18505 New Material Requisition To Resource Division RTOR000580/2023-2024 4894/BWD 10/11/2023 Resource Division 36.98 0.00 0 0
2815 PURBA BARDHAMAN Manteswar Burdwan Division KHANDRA PIPED WATER SUPPLY SCHEME , SM/18505 New Material Requisition To Resource Division RTOR000769/2023-2024 205/BWD 10/01/2024 Resource Division 19.71 0.00 0 0
2816 PURBA BARDHAMAN Manteswar Burdwan Division KHANDRA PIPED WATER SUPPLY SCHEME , SM/18505 New Material Requisition To Resource Division RTOR000779/2023-2024 322/BWD 24/01/2024 Resource Division 42.03 0.00 0 0
2817 PURBA BARDHAMAN Manteswar Central Mechanical KHANDRA PIPED WATER SUPPLY SCHEME , SM/18505 New New Service connection at KHANDRA PWSS TW-2. BILL/02367/2023-2024 BP-2023-24-487 31/01/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 4.60 0.00 0 0
2818 PURBA BARDHAMAN Manteswar Central Mechanical KHANDRA PIPED WATER SUPPLY SCHEME , SM/18505 New New Service connection at KHANDRA PWSS TW-1. BILL/02366/2023-2024 BP-2023-24-486 31/01/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.37 0.00 0 0
2819 PURBA BARDHAMAN Manteswar Central Mechanical KHANDRA PIPED WATER SUPPLY SCHEME , SM/18505 New New service connection for Khandra PH-3 PWSS. BILL/00087/2024-2025 BP-2024-25-26 19/04/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 9.24 0.00 0 0
2820 PURBA BARDHAMAN Manteswar Burdwan Division KHANDRA PIPED WATER SUPPLY SCHEME , SM/18505 New KHANDRA Piped Water Supply Scheme with sinking of Tube-well, LDS, Rising Main, FHTC, Construction of 400 cum capacity RCC OHR with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drain and internal pathway at different TW site under Monteswar Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte J.E. 1 BURDWAN ORD/000691/2023-2024 4387/BWD 05/10/2023 634 AZAD ENTERPRISE 631.12 0.00 0 44
2821 PURBA BARDHAMAN Manteswar Burdwan Division KHANDRA PIPED WATER SUPPLY SCHEME , SM/18505 New Quotation from WBSEDCL for Shifting of 11 KV KHANDRA FEEDER of Khandra PWSS within Durgapur Sub Division under Burdwan Division, PHE Dte. Application ID-100000127499, dt-08.01.2025 BILL/01229/2024-2025 1264/JJM 31/01/2025 WBSEDCL 0.77 0.00 0 null
2822 PURBA BARDHAMAN Manteswar Central Mechanical KHANDRA PIPED WATER SUPPLY SCHEME , SM/18505 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Sutra & others water supply scheme under Monteswar Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000068/2024-2025 2396/CMD 02/08/2024 455 SINHA ELECTRICALS 78.06 0.00 0 20
2823 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting along with intake jetty protection and minor repair of WTP at Surface Water Based Piped Water Supply Scheme for Arsenic affected areas of Purbasthali-II Block , SM/08030 Retrofitting Supply of SS316 grade flow control valve for FHTC at Surface Water Based w/s scheme for Arsenic affected areas of Purbasthali-II block within Kalna Sub-Division under Burdwan Division, PHE Dte. (Part-A) and delivered to Barsul Divisional Store .[Part-3] Assistant Engineer ORD/000113/2021-2022 3836/BWD 23/07/2021 15 A.K. SIKDAR 17.62 17.62 100 1
2824 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting along with intake jetty protection and minor repair of WTP at Surface Water Based Piped Water Supply Scheme for Arsenic affected areas of Purbasthali-II Block , SM/08030 Retrofitting Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of Kamalnagar Surface Based Piped Water Supply Scheme at Sajiara, Simla, Barapara, Bodhsah, Dubrajpur, Gobindapur, Isabpur, Kaibati, Khord Kaibati, Kubajpur, Kuksimla, Muksimpara, Sanghoshpara, Sumuria & Chhatni (15nos) Village (Mouza) under Kalna Sub Division, PHE Dte. Assistant Engineer ORD/000016/2021-2022 3230/BWD 10/06/2021 60 UNICON INDIA 223.63 131.85 58.96 1
2825 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting along with intake jetty protection and minor repair of WTP at Surface Water Based Piped Water Supply Scheme for Arsenic affected areas of Purbasthali-II Block , SM/08030 Retrofitting Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of Kamalnagar Surface Based Piped Water Supply Scheme at Majida, Rukuspur, Uttar Lakshmipur, Candipur, Gopipur, Kuturia & Mertala (7nos) Village (Mouza) under Kalna Sub Division, PHE Dte. Assistant Engineer ORD/000027/2021-2022 3393/BWD 24/06/2021 60 SATYANARAYAN ENGINEERS CO. OP. SOCIETY LTD. 219.81 217.34 98.88 1
2826 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting along with intake jetty protection and minor repair of WTP at Surface Water Based Piped Water Supply Scheme for Arsenic affected areas of Purbasthali-II Block , SM/08030 Retrofitting Work Order for Providing Functional Household Tap Connection(FHTC) from existing distribution system within the command area of Kamalnagar Surface Based Piped Water Supply Scheme at Muragachha, Sardanga, Sihipara, Bagachra, Baragachhi, Belgachhi, Kumirpara, Lohachur, Atpara, Barea, Dhamas, Kamalapur & Kamalnagar (13nos) Village (Mouza) under Kalna Sub Division, PHE Dte. Assistant Engineer ORD/000037/2021-2022 3418/BWD 25/06/2021 60 MRITYUNJOY MUKHERJEE & CO. 232.13 208.68 89.9 1
2827 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting along with intake jetty protection and minor repair of WTP at Surface Water Based Piped Water Supply Scheme for Arsenic affected areas of Purbasthali-II Block , SM/08030 Retrofitting Work Order for Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of Kamalnagar Surface Based Piped Water Supply Scheme at Hapania, Kankhal, Khar Dattapara, Pathangram, Sontoshpur Pila & Uttar Srirampur (6nos) Village (Mouza) under Kalna Sub Division, PHE Dte. Assistant Engineer ORD/000033/2021-2022 3416/BWD 25/06/2021 60 M/S ASHA CONSTRUCTION 146.22 124.49 85.14 1
2828 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting along with intake jetty protection and minor repair of WTP at Surface Water Based Piped Water Supply Scheme for Arsenic affected areas of Purbasthali-II Block , SM/08030 Retrofitting Construction of wash out & over flow & drain for drain out of over flow water by 250 mm dia UPVC pipeline & soak well along with land development at Zone-I Head work site of surface based water supply scheme within Kalna Sub-Division under Burdwan Division, PHE Dte.[SL-C] Assistant Engineer ORD/000960/2020-2021 160/KSD 19/02/2021 30 INVENT ENGINEERS CO. OPERATIVE SOCIETY LTD. 2.10 1.87 89.05 1
2829 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting along with intake jetty protection and minor repair of WTP at Surface Water Based Piped Water Supply Scheme for Arsenic affected areas of Purbasthali-II Block , SM/08030 Retrofitting Supply of SS316 grade flow control valve for FHTC at surface water based water supply scheme for Arsenic affected areas of Purbasthali-II Block within Kalna Sub-Division under Burdwan Division, PHE Dte.[Part-B] and delivered at Barsul Divisional store. Assistant Engineer ORD/000776/2021-2022 4476/BWD 03/09/2021 15 INDIA PIPE FITTING CO 17.62 17.62 100 1
2830 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting along with intake jetty protection and minor repair of WTP at Surface Water Based Piped Water Supply Scheme for Arsenic affected areas of Purbasthali-II Block , SM/08030 Retrofitting Providing leftout water tap connection in different villages for 100% coverage to make it Sajal Gram from existing distribution system within scheme jurisdiction of different Piped Water Supply Schemes within Purbasthali ¿ II Block under Burdwan Division, PHE. Dte. Assistant Engineer ORD/000365/2021-2022 149/BWD 07/01/2022 30 G.S. CONSTRUCTION & CO. 22.15 21.59 97.47 1
2831 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting along with intake jetty protection and minor repair of WTP at Surface Water Based Piped Water Supply Scheme for Arsenic affected areas of Purbasthali-II Block , SM/08030 Retrofitting Sheet piling and others ancillary works to protect errosion of river bank protection area at raw water intake point of Kamalnagar WTP under Burdwan Division PHE Dte. Assistant Engineer ORD/000021/2022-2023 2015/BWD 18/04/2022 45 CONCORD ENGINEERING 122.20 122.20 100 1
2832 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting along with intake jetty protection and minor repair of WTP at Surface Water Based Piped Water Supply Scheme for Arsenic affected areas of Purbasthali-II Block , SM/08030 Retrofitting Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of Kamalnagar Surface Based Piped Water Supply Scheme at Harispur, Hatsiuri, Jajneswarpur, Jamalpur, Madhupur, Nakadaha, Nimdaha, Palasberia & Sarangpur (9nos) Village (Mouza) under Kalna Sub Division, PHE Dte. Assistant Engineer ORD/000032/2021-2022 3417/BWD 25/06/2021 60 ASHOK KUMAR GHOSH 230.37 206.09 89.46 1
2833 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting along with intake jetty protection and minor repair of WTP at Surface Water Based Piped Water Supply Scheme for Arsenic affected areas of Purbasthali-II Block , SM/08030 Retrofitting Laying of 140 mm dia HDPE Pipe from Bardangamore to Khardattapara more (Node No- 289A -289- 286) of Zone-III under Surface Based W/S Scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. (Sl No-A) Assistant Engineer ORD/000433/2021-2022 84/KSD 20/01/2022 30 UNICON INDIA 4.84 4.74 97.93 1
2834 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting along with intake jetty protection and minor repair of WTP at Surface Water Based Piped Water Supply Scheme for Arsenic affected areas of Purbasthali-II Block , SM/08030 Retrofitting Withdrawing of 110 mm dia HDPE Pipeline and relaying of 140 mm dia HDPE Pipe from Naomatha more to Bordanga more (Node No- 291 to 289-289A) under Surface Based W/S Scheme (Zone-III) within Kalna Sub-Division under Burdwan Division, PHE Dte. (Sl No-B) Assistant Engineer ORD/000434/2021-2022 87/KSD 21/01/2022 30 UNICON INDIA 4.84 2.46 50.83 1
2835 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting along with intake jetty protection and minor repair of WTP at Surface Water Based Piped Water Supply Scheme for Arsenic affected areas of Purbasthali-II Block , SM/08030 Retrofitting Relaying of different dia UPVC pipeline at damaged portion as shown by Horizon of Zone-III of surface based water supply scheme within Kalna Sub-Division under Burdwan Division, PHE Dte.[SL-B] Assistant Engineer ORD/000959/2020-2021 148/KSD 12/02/2021 30 CHANCHAL PAL 4.82 3.98 82.57 1
2836 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting along with intake jetty protection and minor repair of WTP at Surface Water Based Piped Water Supply Scheme for Arsenic affected areas of Purbasthali-II Block , SM/08030 Retrofitting Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of Kamalnagar Surface Based Piped Water Supply Scheme at Ukhra, Dafarpota, Dampal, Mmudpur, Narayanpur, Nowapara, Patuli, Tegachhi & Gachha (9nos) Village (Mouza) under Kalna Sub Division, PHE Dte. Assistant Engineer ORD/000006/2021-2022 3122/BWD 02/06/2021 60 SK ALIM 212.45 147.10 69.24 1
2837 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting along with intake jetty protection and minor repair of WTP at Surface Water Based Piped Water Supply Scheme for Arsenic affected areas of Purbasthali-II Block , SM/08030 Retrofitting Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of Augmentation of Purbasthali Piped Water Supply Scheme at Kasthashali Village (Kasthashali habitation) (Mouza) & Purbasthali village (Purbasthali habitation), Purbasthali-II Block under Burdwan Division, PHE Dte. Assistant Engineer ORD/000316/2020-2021 1328/BWD 12/02/2021 60 INDIAN ENGINEERS CO.-OPERATIVE SOCIETY LTD. 91.41 3.02 3.3 1
2838 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting along with intake jetty protection and minor repair of WTP at Surface Water Based Piped Water Supply Scheme for Arsenic affected areas of Purbasthali-II Block , SM/08030 Retrofitting Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of Kamalnagar Surface Based Piped Water Supply Scheme at Biswarambha, Dhitpur, Doghori, Falea, Harishi & Moail, (6nos) Village (Mouza) under Kalna Sub Division, PHE Dte. AE(HQs) J.E. 2 BURDWAN ORD/000005/2021-2022 3121/BWD 02/06/2021 60 IJABUL SEKH 225.09 205.05 91.1 0
2839 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting along with intake jetty protection and minor repair of WTP at Surface Water Based Piped Water Supply Scheme for Arsenic affected areas of Purbasthali-II Block , SM/08030 Retrofitting Painting and renovation work of WTP Building, Boundary Wall, Truss Bridge etc. at Kamalnagar of Surface Water Based Water Supply Scheme within Kalna Sub-Divn. under Burdwan Division, PHE. Dte. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000886/2023-2024 5517/BWD 14/12/2023 30 SETH ENTERPRISE 12.63 0.00 0 100
2840 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting along with intake jetty protection and minor repair of WTP at Surface Water Based Piped Water Supply Scheme for Arsenic affected areas of Purbasthali-II Block , SM/08030 Retrofitting Painting & renovation work at Purbasthali raw water pumping station within Kalna Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/001122/2023-2024 4560/BWD 16/10/2023 30 CONCORD ENGINEERING 6.53 0.00 0 100
2841 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting along with intake jetty protection and minor repair of WTP at Surface Water Based Piped Water Supply Scheme for Arsenic affected areas of Purbasthali-II Block , SM/08030 Retrofitting Repairing and Renovation of Filter Bed, Main Boundary Gate, resetting of Paver Block Pathway, replacement of different damaged portion of doors/windows or any other structures & other related works for Kamalnagar WTP within Kalna Sub Division under Burdwan Division, P.H.E. Dte. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000894/2023-2024 5510/BWD 14/12/2023 120 GHOSH BROTHERS 47.97 26.68 55.62 5
2842 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting along with intake jetty protection and minor repair of WTP at Surface Water Based Piped Water Supply Scheme for Arsenic affected areas of Purbasthali-II Block , SM/08030 Retrofitting Conducting physical Household Survey at the IMIS reported village for HGJ certification and providing balance FHTC for Har Ghar Jal certification including conducting Gram Sabhas for different IMIS reported villages across the district under Burdwan Division, PHE Dte. AE(HQs),Assistant Engineer ,Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE.,Assistant Engineer, Durgapur Sub Division, P.H.E. Dte JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000428/2024-2025 3107/BWD 12/08/2024 90 TUBGRAM GRAMMYAK UNNAYAN SAMITY 309.60 0.00 0 50
2843 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting along with intake jetty protection and minor repair of WTP at Surface Water Based Piped Water Supply Scheme for Arsenic affected areas of Purbasthali-II Block , SM/08030 Retrofitting Different types of works involve in connection with Augmentation of KRISHNABATI (SM/07827), PURBASTHLI (SM/07866), SINHARI (SM/09716) & SURFACE based W/S Scheme (SM/15571) Piped water supply scheme under Purbasthali-II Block, Kalna Sub-Division, PHE Dte. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000181/2024-2025 2296/BWD 20/06/2024 360 M/S DATTA ENTERPRISE 579.85 0.00 0 2
2844 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting along with intake jetty protection and minor repair of WTP at Surface Water Based Piped Water Supply Scheme for Arsenic affected areas of Purbasthali-II Block , SM/08030 Retrofitting Supply & Laying of 300mm Dia M.S.E.R.W Pipe including Jack Pushing along with other allied work in connection with different Augmentation & New [(SM/18439, SM/14437, SM/14435, SM/07805, SM/14440, SM/15571, SM/08030, SM/16014, SM/15588, SM/16298 & SM/16307)] under Kalna Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/001187/2024-2025 608/BWD 11/02/2025 180 MANASH GHOSH 1,209.62 0.00 0 0
2845 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Jageswardihi Piped Water Supply Scheme , SM/06966 Retrofitting Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Jaggeswardihi village of Jaggeswardihi Piped Water Supply Scheme within Katwa Sub-Divn. under Burdwan Division, PHE. Dte. [Phase - I] [SL. No : 9A] (T.R. No.-219/BWD/2020-21) ORD/000139/2020-2021 2630/BWD 04/08/2020 30 ABDUL HAI 4.92 0.00 0 1
2846 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Jageswardihi Piped Water Supply Scheme , SM/06966 Retrofitting Continuation work order for Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Jaggeswardihi (Part) village of Jaggeswardihi piped water supply scheme within Katwa Sub-Division under Burdwan Division, PHE Dte. [Phase-I](Tr No.-251/BWD/2020-21) AE(HQs) J.E. 2 BURDWAN ORD/000243/2020-2021 3383/BWD 22/09/2020 30 SUBRATA GUPTA 4.92 4.92 100 1
2847 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Jageswardihi Piped Water Supply Scheme , SM/06966 Retrofitting Continuation work order for Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Jaggeswardihi (Part) village of Jaggeswardihi piped water supply scheme within Katwa Sub-Division under Burdwan Division, PHE Dte. [Phase-I](Tr No.-250/BWD/2020-21) Assistant Engineer JUNIOR ENGINEER R.W.S. BURDWAN SUB-DIVISION PHE DTE ORD/000244/2020-2021 3413/BWD 22/09/2020 30 ABDUL HAI 4.92 4.92 100 1
2848 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Jageswardihi Piped Water Supply Scheme , SM/06966 Retrofitting Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Chaitynapur village of Jaggeswardihi piped water supply scheme within Katwa Sub-Division under Burdwan Division, PHE Dte. [Phase-I](Tr No.-204/BWD/2020-21) ORD/000089/2020-2021 2604/BWD 04/08/2020 30 SUBRATA GUPTA 4.92 4.92 100 1
2849 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Jageswardihi Piped Water Supply Scheme , SM/06966 Retrofitting Extension of pipeline from the existing distribution system within scheme jurisdiction at Kanaidanga under Jaggeswardihi piped water supply scheme under Mongalkote Block within Katwa Sub-Division under Burdwan Division, PHE Dte. [Phase-2] Assistant Engineer JUNIOR ENGINEER R.W.S. BURDWAN SUB-DIVISION PHE DTE ORD/000830/2020-2021 82/KTS 09/02/2021 15 HAMID SK 1.25 0.00 0 1
2850 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Jageswardihi Piped Water Supply Scheme , SM/06966 Retrofitting Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of Jageswardihi Piped Water Supply Scheme at Kaichar & Sitalgram Village (Mouza), Mongolkot Block under Burdwan Division, PHE Dte. Assistant Engineer ORD/000258/2021-2022 6694/BWD 01/12/2021 60 HAMID SK 58.77 32.80 55.81 1
2851 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Jageswardihi Piped Water Supply Scheme , SM/06966 Retrofitting Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of Jaggeswardihi Piped Water Supply Scheme at Kanaidanga & Jageswardihi (1 Part & 1 Habitation) Village (Mouza), Mangolkote Block under Burdwan Division, PHE Dte.[Agreement No. 578/BWD OF 2020-2021] AE(HQs) J.E. 2 BURDWAN ORD/000331/2020-2021 436/BWD 19/01/2021 45 KHEPIMA ENGINEERS CO. OPERATIVE SOCIETY LTD. 38.09 37.75 99.11 0
2852 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting at Teandul PWSS , SM/06746 Retrofitting Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of TEANDUL Piped Water Supply Scheme at Raina-I Block under Burdwan Division, PHE Dte.(Agreement No. 61/2020-2021 OF SE/CC/PHE. DTE.) Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000112/2020-2021 4881/BWD 07/12/2020 90 ASHOK KUMAR GHOSH 70.51 45.29 64.23 1
2853 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting at Teandul PWSS , SM/06746 Retrofitting Construction of Retaining wall for protection of soil erosion at Headwork site (Western Side) at TEANDUL Piped Water Supply Scheme under Burdwan Division, PHE Dte. [Group : B] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000035/2022-2023 241/AE/HQ 20/04/2022 30 ROY CONSTRUCTION 4.82 0.00 0 1
2854 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting at Teandul PWSS , SM/06746 Retrofitting Construction of Retaining wall for protection of soil erosion at Headwork site (southern side) at Teandul PWSS under Burdwan Division, PHE Dte. [Group: ¿H¿] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000224/2021-2022 1902/AE/HQ 16/11/2021 30 ASHOK KUMAR GHOSH 4.50 0.00 0 1
2855 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting at Teandul PWSS , SM/06746 Retrofitting Extension Pipeline with Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of Madhuban, Sultanbad, Dhamas & Teyandul of TEANDUL Piped Water Supply Scheme within Raina I Block of Burdwan Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000754/2022-2023 1228/BWD 17/03/2023 60 M/S UNIQUE 31.31 0.00 0 0
2856 PURBA BARDHAMAN Burdwan Division Providing Functional House Hold Tap Connection (FHTC) by retrofitting within the command area of Nandra Piped Water Supply Scheme , SM/07205 Retrofitting Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Nandra village of Nandra piped water supply scheme within Burdwan Sub-Division under Burdwan Division, PHE Dte. [Phase-I](Tr No.-176/BWD/2020-21) Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000102/2020-2021 2735/BWD 10/08/2020 30 BHARAT CONSTRUCTION 4.92 4.92 100 1
2857 PURBA BARDHAMAN Burdwan Division Providing Functional House Hold Tap Connection (FHTC) by retrofitting within the command area of Nandra Piped Water Supply Scheme , SM/07205 Retrofitting Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Kalyanpur & Dangachha village of Nandra piped water supply scheme within Burdwan Sub-Division under Burdwan Division, PHE Dte. [Phase-I](Tr No.-177/BWD/2020-21) Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000103/2020-2021 2736/BWD 10/08/2020 30 BHARAT CONSTRUCTION 4.92 4.92 100 1
2858 PURBA BARDHAMAN Burdwan Division Providing Functional House Hold Tap Connection (FHTC) by retrofitting within the command area of Nandra Piped Water Supply Scheme , SM/07205 Retrofitting Continuation work order for Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Nandra village of Nandra piped water supply scheme within Burdwan Sub-Division under Burdwan Division, PHE Dte. [Phase-I] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000714/2020-2021 4087/BWD 16/10/2020 30 BHARAT CONSTRUCTION 2.00 2.00 100 1
2859 PURBA BARDHAMAN Burdwan Division Providing Functional House Hold Tap Connection (FHTC) by retrofitting within the command area of Nandra Piped Water Supply Scheme , SM/07205 Retrofitting Additional Extension of UPVC distribution pipeline in connection with FHTC for NANDRA & adjoining mouzas water supply scheme at Bardhaman-I Block under Burdwan division, PHE Dte.[Gr.-C] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000743/2020-2021 73/BSD 19/01/2021 30 BHARAT CONSTRUCTION 4.22 4.18 99.05 1
2860 PURBA BARDHAMAN Burdwan Division Providing Functional House Hold Tap Connection (FHTC) by retrofitting within the command area of Nandra Piped Water Supply Scheme , SM/07205 Retrofitting Providing FHTC (130 nos.) and Extension of UPVC dist. Pipeline at Noapara, Pirtala ,Nandra village of NANDRA water supply scheme at Burdwan-II Block under Burdwan Division PHE Dte..Gr. I Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000213/2021-2022 1479/BSD 09/11/2021 30 BHARAT CONSTRUCTION 4.81 4.81 100 1
2861 PURBA BARDHAMAN Burdwan Division Providing Functional House Hold Tap Connection (FHTC) by retrofitting within the command area of Nandra Piped Water Supply Scheme , SM/07205 Retrofitting Providing FHTC in Nandra & Naopara village for 100% coverage in Sajal Gram from existing distribution system within NANDRA PWSS, Bardhhaman-II Development Block under Burdwan Division, PHE Dte. Gr.F. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000339/2022-2023 1360/BSD 03/08/2022 5 BHARAT CONSTRUCTION 0.97 0.00 0 1
2862 PURBA BARDHAMAN Burdwan Division Providing Functional House Hold Tap Connection (FHTC) by retrofitting within the command area of Nandra Piped Water Supply Scheme , SM/07205 Retrofitting Providing FHTC in Nandra & Naopara village for 100% coverage in Sajal Gram from existing distribution system within Nandra PWSS, Bardhhaman-II Development Block under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000654/2022-2023 1360-A/BSD 03/08/2022 5 BHARAT CONSTRUCTION 0.97 0.96 98.97 1
2863 PURBA BARDHAMAN Burdwan Division Providing Functional House Hold Tap Connection (FHTC) by retrofitting within the command area of Nandra Piped Water Supply Scheme , SM/07205 Retrofitting Providing leftout water tap connection in different villages for 100% coverage in Sajal Gram from existing distribution system within scheme jurisdiction of different Piped Water Supply Schemes within Burdwan ¿ II Block under Burdwan Division, PHE. Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000416/2021-2022 385/BWD 20/01/2022 30 BISWAS ENTERPRISE 11.97 0.00 0 100
2864 PURBA BARDHAMAN Burdwan Division Providing Functional House Hold Tap Connection (FHTC) by retrofitting within the command area of Nandra Piped Water Supply Scheme , SM/07205 Retrofitting Continuation work order for Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Kalyanpur & Dangachha village of Nandra Piped Water Supply Scheme within Burdwan Sub-Divn. under Burdwan Division, PHE. Dte. [Phase - I] [GROUP : ¿10B¿] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. Junior Engineer, Burdwan Sadar Sub-Division ORD/000463/2020-2021 4085/BWD 16/10/2020 30 BHARAT CONSTRUCTION 1.65 1.65 100 0
2865 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of CHAK SANJADI Piped Water Supply Scheme at Jamalpur Block , SM/07857 Retrofitting Supply of materials for different water supply scheme under Burdwan Division, PHE Dte. VCH/001237/2021-2022 1132/DW 26/02/2022 EXECUTIVE ENGINEER, RESOURCES DIVISION, P.H.E. DTE. 221.00 0.00 0 0
2866 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of CHAK SANJADI Piped Water Supply Scheme at Jamalpur Block , SM/07857 Retrofitting Construction of Boundary wall at 2nd TW site for Chakshanjadi W/S Scheme with in Jamalpur block under Burdwan Div. PHED.(Lenth-78.0mtr & Col.-28nos.) GROUP : F Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. Junior Engineer, R.W.S. Burdwan Sub Division, P.H.E. Dt ORD/000085/2022-2023 819/BSD 20/05/2022 45 SOUMYAVASH DAS 4.06 0.00 0 1
2867 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of CHAK SANJADI Piped Water Supply Scheme at Jamalpur Block , SM/07857 Retrofitting Extension of pipeline including providing FHTC for CHAKSHANJADI Piped Water Supply Scheme at Chalbalpur Habitation for Sajal Gram (As per Field Verification Report duly signed by Pradhan for Har Ghar Jal Certification) within Jamalpur Block under Burdwan Divn.PHE Dte.Gr.G. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. Junior Engineer, R.W.S. Burdwan Sub Division, P.H.E. Dt ORD/000340/2022-2023 1361/BSD 03/08/2022 5 M/S ANAND CONSTRUCTION 0.95 0.00 0 1
2868 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of CHAK SANJADI Piped Water Supply Scheme at Jamalpur Block , SM/07857 Retrofitting Extension of pipeline providing FHTC for CHAKSHANJADI Piped Water Supply Scheme at Chalbalpur Habitation for Sajal Gram(As per Field Verification Report duly signed by Pradhan for Har Ghar Jal Certification)within Jamalpur Block under Burdwan Divn.PHE Dte.Gr.H. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. Junior Engineer, R.W.S. Burdwan Sub Division, P.H.E. Dt ORD/000341/2022-2023 1364/BSD 04/08/2022 5 M/S ANAND CONSTRUCTION 0.96 0.00 0 1
2869 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of CHAK SANJADI Piped Water Supply Scheme at Jamalpur Block , SM/07857 Retrofitting Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of Chaksanjadi Piped Water Supply Scheme at Jamdaha, Haibatpur, Chalbalpur & Kanakpur Village (Mouza), Jamalpur Block under Burdwan Division, PHE Dte. (Agreement no. 791/BWD of 2020-2021) Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. Junior Engineer, R.W.S. Burdwan Sub Division, P.H.E. Dt ORD/000432/2020-2021 1795/BWD 26/02/2021 45 M/S GUPTA ENTERPRISE 40.21 39.33 97.81 1
2870 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of CHAK SANJADI Piped Water Supply Scheme at Jamalpur Block , SM/07857 Retrofitting Providing leftout water tap connection in different villages for 100% coverage to make it Sajal Gram from existing distribution system within scheme jurisdiction of different Piped Water Supply Schemes within Jamalpur Block (Paratal-II, Berugram, Abujhati & Chakdighi G.P.) under Burdwan Division, PHE. Dte. (Part-B). AE(HQs),Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JE/RWS/JAMALPUR ORD/000345/2021-2022 40/BWD 05/01/2022 30 PREMANANDA ROY BISWAS 22.68 0.00 0 1
2871 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of CHAK SANJADI Piped Water Supply Scheme at Jamalpur Block , SM/07857 Retrofitting Laying of interconnection of both the Pump No.1,2 & 3 and distribution main of 250 mm dia along with Byw-Pass arrangement from Over Head Reservoir for Chak Shanjadi piped water supply scheme within Jamalpur Block under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. Junior Engineer, R.W.S. Burdwan Sub Division, P.H.E. Dt ORD/000925/2020-2021 4970/BWD 10/12/2020 30 TIRUPATI ENTERPRISES 8.98 0.00 0 1
2872 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of CHAK SANJADI Piped Water Supply Scheme at Jamalpur Block , SM/07857 Retrofitting Continuation order for supply & delivery of different dia CIDF pipes, sluice valve & fittings for construction of RCC OHR (400 cum capacity) for Chakshanjadi w/s scheme under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. Junior Engineer, R.W.S. Burdwan Sub Division, P.H.E. Dt ORD/000693/2021-2022 387/BWD 20/01/2022 20 B.B.C. ENTERPRISE 15.17 0.00 0 1
2873 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of CHAK SANJADI Piped Water Supply Scheme at Jamalpur Block , SM/07857 Retrofitting Providing leftout water tap connection in different villages for 100% coverage to make it Sajal Gram from existing distribution system within scheme jurisdiction of different Piped Water Supply Schemes within Jamalpur Block (Jarogram, Ajhapur, Panchra & Jougram G.P.) under Burdwan Division, PHE. Dte. (Part-A)_2ND CALL. AE(HQs),Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JE/RWS/JAMALPUR ORD/000592/2021-2022 1454/BWD 11/03/2022 30 PREMANANDA ROY BISWAS 18.83 0.00 0 1
2874 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of CHAK SANJADI Piped Water Supply Scheme at Jamalpur Block , SM/07857 Retrofitting Construction of boundary wall at Head works site of CHAKSHANJADI Piped Water Supply Scheme in Jamalpur Block under Burdwan Division, PHE Dte. (Length - 123 Mtr., 46 Nos Column). Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. Junior Engineer, R.W.S. Burdwan Sub Division, P.H.E. Dt ORD/000098/2022-2023 2743/BWD 08/06/2022 30 MOYAZZEM CONSTRUCTION 8.12 0.00 0 1
2875 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of CHAK SANJADI Piped Water Supply Scheme at Jamalpur Block , SM/07857 Retrofitting Construction of Boundary wall at 3rd TW site for Chakshanjadi W/S Scheme with in Jamalpur block under Burdwan Div. PHED.(Lenth-48.0mtr & Col.-19nos.) GROUP : E Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. Junior Engineer, R.W.S. Burdwan Sub Division, P.H.E. Dt ORD/000084/2022-2023 818/BSD 20/05/2022 45 M/S PURBASHA 4.06 0.00 0 1
2876 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of CHAK SANJADI Piped Water Supply Scheme at Jamalpur Block , SM/07857 Retrofitting Material Requisition To Resource Division RTOR000124/2021-2022 1107/BWD 26/02/2022 Resource Division 44.82 0.00 0 0
2877 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of CHAK SANJADI Piped Water Supply Scheme at Jamalpur Block , SM/07857 Retrofitting Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of Chaksanjadi Piped Water Supply Scheme at Chaksanjadi & Shambhupur Village (Mouza), Jamalpur Block under Burdwan Division, PHE Dte. [Agreement No. 680/BWD OF 2020-2021] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. Junior Engineer, R.W.S. Burdwan Sub Division, P.H.E. Dt ORD/000313/2020-2021 1399/BWD 15/02/2021 45 B.B.C. ENTERPRISE 43.50 42.30 97.24 0
2878 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) under the command area of Chandutia Piped Water Supply Scheme , SM/07554 Retrofitting Providing leftout water tap connection in different villages for 100% coverage to make it Sajal Gram from existing distribution system within scheme jurisdiction of different Piped Water Supply Schemes within Burdwan ¿ I Block under Burdwan Division, PHE. Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000342/2021-2022 32/BWD 04/01/2022 30 ROY BISWAS CONSTRUCTION 9.89 5.00 50.56 1
2879 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) under the command area of Rahatpur Piped Water Supply Scheme , SM/07555 Retrofitting Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Rahatpur village and Rahatpur Habitation of Rahatpur piped water supply scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. [Phase-I](Tr No.-491/BWD/2020-21) Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000200/2020-2021 4116/BWD 16/10/2020 30 DUBE ENTERPRISE 4.87 4.87 100 1
2880 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) under the command area of Rahatpur Piped Water Supply Scheme , SM/07555 Retrofitting Extension of 63 mm dia UPVC pipeline to provide house connection to the beneficiaries of Rahatpur water supply scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. [Sl No.-B] Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000828/2020-2021 139/KSD 12/02/2021 30 DUBE ENTERPRISE 4.49 4.57 101.78 1
2881 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) under the command area of Rahatpur Piped Water Supply Scheme , SM/07555 Retrofitting Continuation work order for water tap connection in each house hold from existing distribution system within scheme jurisdiction in Rahatpur village and Rahatpur habitation of Rahatpur piped water supply scheme within Kalna Sub-Division under Burdwan Division, PHE Dte.[Phase-I][Gr.-7A] Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000837/2020-2021 4913./BWD 08/12/2020 30 DUBE ENTERPRISE 4.31 3.61 83.76 1
2882 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of MANGOLKOTE and NATUNHAT Piped Water Supply Scheme at Mangolkote Block , SM/07859 Retrofitting Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of Mongalkot Piped Water Supply Scheme at Mongalkot (3 Nos Habitation) Village (Mouza), Mongalkot Block under Burdwan Division, PHE Dte. Assistant Engineer ORD/000087/2021-2022 3598/BWD 13/07/2021 60 S.S. CONSTRUCTION 115.84 55.53 47.94 1
2883 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of MANGOLKOTE and NATUNHAT Piped Water Supply Scheme at Mangolkote Block , SM/07859 Retrofitting Supply of materials for different water supply scheme under Burdwan Division, PHE Dte. VCH/001237/2021-2022 1132/DW 26/02/2022 EXECUTIVE ENGINEER, RESOURCES DIVISION, P.H.E. DTE. 221.00 0.00 0 0
2884 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of MANGOLKOTE and NATUNHAT Piped Water Supply Scheme at Mangolkote Block , SM/07859 Retrofitting Hire & fuel charges of vehicle (Car No.-WB-04G/6018) for the office of the Assistant Engineer, Katwa Sub-Division, PHE Dte. for the month of May & June'2022. VCH/000646/2022-2023 546/VEH/22-23 13/09/2022 M/S MUNMUN DEY 0.56 0.00 0 0
2885 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of MANGOLKOTE and NATUNHAT Piped Water Supply Scheme at Mangolkote Block , SM/07859 Retrofitting Extension and replacement of pipe line from the existing Distribution System within scheme jurisdiction at Mongalkote village under Mongalkote PWSS under Mongalkote Block within Katwa Sub-Division under Burdwan Division PHE Dte. [Sl No-02] Assistant Engineer ORD/000154/2022-2023 438/KTS 27/06/2022 30 NANGTASWAR CO. OP. LABOUR CONT. AND CONSTRUCTION SOCIETY LTD. 4.75 4.70 98.95 1
2886 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of MANGOLKOTE and NATUNHAT Piped Water Supply Scheme at Mangolkote Block , SM/07859 Retrofitting Extension and replacement of pipe line from the existing Distribution System within scheme jurisdiction at Mongalkote village under Mongalkote PWSS under Mongalkote Block within Katwa Sub-Division under Burdwan Division PHE Dte. [Sl No-03] Assistant Engineer ORD/000155/2022-2023 439/KTS 27/06/2022 30 NANGTASWAR CO. OP. LABOUR CONT. AND CONSTRUCTION SOCIETY LTD. 1.38 1.38 100 1
2887 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of MANGOLKOTE and NATUNHAT Piped Water Supply Scheme at Mangolkote Block , SM/07859 Retrofitting Laying of 150 mm dia. D.I distribution pipe line and restoration of drainage system at Mojlish Dighir Par at Mongalkote under MONGALKOTE Piped Water Supply Scheme under Mongalkote Block under Katwa Sub-Division under Burdwan Division, P.H.E. Dte. Assistant Engineer ORD/000615/2021-2022 1577/BWD 16/03/2022 30 ASMA ENTERPRISE 7.93 0.00 0 1
2888 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of MANGOLKOTE and NATUNHAT Piped Water Supply Scheme at Mangolkote Block , SM/07859 Retrofitting Material Requisition To Resource Division RTOR000116/2021-2022 1101/BWD 26/02/2022 Resource Division 9.23 0.00 0 0
2889 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of MANGOLKOTE and NATUNHAT Piped Water Supply Scheme at Mangolkote Block , SM/07859 Retrofitting Vehicle bill (Car No.-WB-04G-7127) for the month of September'2023. BILL/01680/2023-2024 1041/JJM 11/12/2023 PARTHA PRATIM ACHARYA 0.39 0.00 0 0
2890 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Nabagram Piped Water Supply Scheme at Memari-I Block , SM/07798 Retrofitting Extension of pipeline for NABAGRAM Piped Water Supply Scheme at Konarpara [24 No's]Total 24 No's FHTC Work for Sajal Gram (As per Resulation taken in Special Gram Sava on 01-08-2022 within Memari-I Block including leftout husehold water tap connection (FHTC) under Burdwan Division, PHE Dte".Gr. B Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000334/2022-2023 1351/BSD 02/08/2022 5 BHARAT CONSTRUCTION 0.97 0.00 0 1
2891 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Nabagram Piped Water Supply Scheme at Memari-I Block , SM/07798 Retrofitting Extension of pipeline for NABAGRAM Piped water Supply Scheme at Kalupukur[2 Nos]Kalanabagram[5 Nos]Dadpur[8 Nos],Paschim Memari[6 Nos]Pingur[3 Nos]Chuadanga:3 Nos Total 27 Nos FHTC Work for Sajal Gram(As per Resulation taken in Special Gram Sava on 01-08-2022 within Memari-I Block including leftout household water tap connection(FHTC)under Burdwan Division,PHE Dte.Gr.C. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000335/2022-2023 1352/BSD 02/08/2022 5 BHARAT CONSTRUCTION 0.97 0.00 0 1
2892 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Nabagram Piped Water Supply Scheme at Memari-I Block , SM/07798 Retrofitting Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of Nabagram Piped Water Supply Scheme at Konar Village (2 Nos. habitations), Dadpur Village (4 Nos. habitations), Paschim Memari Village (2 Nos. habitations), Pingur Village & Nabagram Village (4 Nos. habitations), Memari - I Block under Burdwan Division, PHE Dte.[Agreement No. 681/BWD OF 2020-2021] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000311/2020-2021 1400/BWD 15/02/2021 60 UNIQUE AGENCY 68.10 25.55 37.52 1
2893 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Nabagram Piped Water Supply Scheme at Memari-I Block , SM/07798 Retrofitting Providing leftout water tap connection in different villages for 100% coverage to make it Sajal Gram from existing distribution system within scheme jurisdiction of different Piped Water Supply Schemes within Memari-I Block (Daluibazar-II, Gopegantar-I & II G.P.) under Burdwan Division, PHE. Dte. Dte._Part-A. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000371/2021-2022 209/BWD 11/01/2022 30 M/S ANAND CONSTRUCTION 21.11 0.00 0 1
2894 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Nabagram Piped Water Supply Scheme at Memari-I Block , SM/07798 Retrofitting Extension of pipeline for NABAGRAM Piped Water Supply Scheme at Konarpara [24 No's]Total 24 No's FHTC Work for Sajal Gram (As per Resulation taken in Special Gram Sava on 01-08-2022 within Memari-I Block including leftout husehold water tap connection(FHTC) under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000645/2022-2023 1351-A/BSD 02/08/2022 5 BHARAT CONSTRUCTION 0.97 0.97 100 1
2895 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Nabagram Piped Water Supply Scheme at Memari-I Block , SM/07798 Retrofitting Extension of pipeline for NABAGRAM Piped Water Supply Scheme at Kalupukur [2 No's], Kalanabagram[5 No's] Dadpur [8 No's], Paschim Memari [6 No's], Pingur [3 No's] Chuadanga [3 No's] Total 27 No's FHTC Work for Sajal Gram (As per Resulation taken in Special Gram Sava on 01-08-2022 within Memari-I Block including leftout household water tap connection (FHTC) under Burdwan Division, PHE Dte Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000646/2022-2023 1352-A/BSD 02/08/2022 5 BHARAT CONSTRUCTION 0.97 0.97 100 1
2896 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Nabagram Piped Water Supply Scheme at Memari-I Block , SM/07798 Retrofitting Sinking of 150mm. dia. 100 Mtr. Deep tube well & Laying Distribution pipeline including FHTC under Jal Swapna Scheme for SWASTI PALLY Mini Piped W/S. Scheme within NABAGRAM Piped W/S. Scheme under Burdwan Division, PHE. Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000714/2022-2023 890/BWD 01/03/2023 45 BAMDEB CONSTRUCTION & CO 30.68 16.90 55.08 100
2897 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Mahishgaria Piped Water Supply Scheme at Jamalpur Block , SM/07799 Retrofitting Extension of pipeline including leftout Functional Household Tap Connection (FHTC) for Mahishgoria Piped Water Supply Scheme at Mahishgoria, Bidyabatipur, Narayanpur village in Jamalpur Block under Burdwan Division, PHE Dte. GROUP : D AE(HQs) ORD/000230/2022-2023 427/AE/HQ 03/08/2022 30 A R TRADERS 4.91 4.91 100 1
2898 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Mahishgaria Piped Water Supply Scheme at Jamalpur Block , SM/07799 Retrofitting Providing FHTC for 100% coverage at Baidyabatipur, Tilkuria, Mahishgaria, Narayanpur & Mathurapur village (Mouza) for MAHISHGARIA Piped W/S Scheme, Jamalpur Dev. Block under Burdwan Division, PHE Dte. ORD/000101/2023-2024 2259/BWD 18/05/2023 30 MUKHERJEE ENTERPRISE 11.92 11.75 98.57 100
2899 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Mahishgaria Piped Water Supply Scheme at Jamalpur Block , SM/07799 Retrofitting Land development and Construction of valve chamber by raising of height for control of water flow within command area of MAHISHGORIA H/W Pump house, MAHISHGORIA piped W/S Scheme at Jamalpur Development Block under Burdwan Division, PHE Dte. JE/RWS/JAMALPUR ORD/001034/2024-2025 86/AE/HQ 08/01/2025 30 A.R. TRADERS 0.93 0.00 0 0
2900 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Mahishgaria Piped Water Supply Scheme at Jamalpur Block , SM/07799 Retrofitting Land development and Construction of valve chamber by raising of height at 2nd Pumphouse, MAHISHGORIA piped W/S Scheme at Jamalpur Development Block under Burdwan Division, PHE Dte. JE/RWS/JAMALPUR ORD/001033/2024-2025 85/AE/HQ 08/01/2025 30 A.R. TRADERS 0.72 0.00 0 0
2901 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Gopalpur Piped Water Supply Scheme , SM/07800 Retrofitting Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Paschim Gopalpur (Part) village (Jadabbati, Mirapur & Paschim Gopalpur (Part) habitation) & Radhanagar village (Radhanagar habitation) of Paschim Gopalpur Piped Water Supply Scheme within Katwa Sub-Divn. under Burdwan Division, PHE. Dte. [Sl. No. : ¿14¿] Assistant Engineer ORD/000711/2020-2021 64/BWD 05/01/2021 15 ASMA ENTERPRISE 4.86 4.86 100 1
2902 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Gopalpur Piped Water Supply Scheme , SM/07800 Retrofitting Extension of pipe line from the existing Distribution System within scheme jurisdiction at Paschim Gopalpur & Mirapur village under Paschim Gopalpur PWSS under Katwa Sub-Division under Burdwan Division PHE Dte. (Sl No-1) Assistant Engineer ORD/000236/2021-2022 698/KTS 27/10/2021 15 ASMA ENTERPRISE 1.06 1.06 100 1
2903 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Gopalpur Piped Water Supply Scheme , SM/07800 Retrofitting Providing Functional Household Tap Connection from existing distribution system at Sukhpukuria village under Gotistha Gram Panchayet under Mongalkote Block under Paschim Gopalpur PWSS under Katwa Sub-Division under Burdwan Division PHE Dte. (Sl No-2) Assistant Engineer ORD/000274/2021-2022 799/KTS 10/12/2021 15 JAMALUDDIN SK 3.69 3.67 99.46 1
2904 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Gopalpur Piped Water Supply Scheme , SM/07800 Retrofitting Providing leftout water tap connection in different villages for 100% coverage to make it Sajal Gram from existing distribution system within scheme jurisdiction of different Piped Water Supply Schemes within Mongalkote Block under Burdwan Division, PHE. Dte. Assistant Engineer ORD/000407/2021-2022 284/BWD 17/01/2022 30 BABUL SK 6.81 0.00 0 1
2905 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Gopalpur Piped Water Supply Scheme , SM/07800 Retrofitting Providing Functional Household Tap Connection at Jadabbati,Sukhpukuria and Pilsona habitation of Paschim Gopalpur, Sukhpukuria and Pilsona village of Gotistha G.P. from existing distribution system within the command area of Paschim Gopalpur PWSS under Mongalkote Block under Katwa Sub-Division under Burdwan Division PHE Dte. Assistant Engineer ORD/000591/2021-2022 1439/BWD 11/03/2022 30 PARTHA PRATIM ACHARYA 10.47 10.41 99.43 1
2906 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Gopalpur Piped Water Supply Scheme , SM/07800 Retrofitting Repairing, height increasing & dewatering from Valve Chamber of Paschim Gopalpur PWSS under Katwa Sub-Division, Block- Mongolkote , Burdwan Division PHE Dte. (Sl No -1) Assistant Engineer JUNIOR ENGINEER KATWA SUB-DIVISION PHE DTE ORD/001058/2024-2025 1597/KTS 13/11/2024 45 ADRIJA ENTERPRISES 0.93 0.00 0 0
2907 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Gopalpur Piped Water Supply Scheme , SM/07800 Retrofitting Construction of approach Road and Land Development at Head Work Site of Paschim Gopalpur PWSS (SM/07800) under Katwa Sub-Division under Mongolkote Block within Burdwan Division PHE Dte. (Sl No -01) Assistant Engineer JUNIOR ENGINEER KATWA SUB-DIVISION PHE DTE ORD/001260/2024-2025 342/KTS 05/03/2025 30 OM CONSTRUCTION 4.83 0.00 0 0
2908 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Gopalpur Piped Water Supply Scheme , SM/07800 Retrofitting Restoration of pipe line at Mera Para to Babunara, Gopalpur to Nayapaya and Pilsoya to Darshini due to construction of drain by PRI bodies along with crossing culvert under the command area Paschim Gopalpur PWSS (SM/07800) under Mongalkote Block under Katwa Sub-Division under Burdwan Division PHE Dte. (Sl No-02) Assistant Engineer JUNIOR ENGINEER KATWA SUB-DIVISION PHE DTE ORD/001262/2024-2025 343/KTS 05/03/2025 30 M/S S. CHOUDHURY 3.63 0.00 0 100
2909 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Mahachanda Piped Water Supply Scheme at Bhatar Block , SM/07867 Retrofitting Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Nunari village and Bandh-O-Tawra & Nunari habitation of MAHACHANDA piped water supply scheme within Durgapur (Bardhaman North) Sub-Division under Burdwan Division, PHE Dte. [Phase-I](Tr No.-529/BWD/2020-21) Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000166/2020-2021 3344/BWD 18/09/2020 30 PAPRI HAZRA 4.86 4.86 100 1
2910 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Mahachanda Piped Water Supply Scheme at Bhatar Block , SM/07867 Retrofitting Continuation work order for Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Nunari village and Bandh-O-Tawra & Nunari habitation of MAHACHANDA piped water supply scheme within Durgapur (Bardhaman North) Sub-Division under Burdwan Division, PHE Dte. [Phase-I](Tr No.-530/BWD/2020-21) Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000170/2020-2021 4006/BWD 14/10/2020 30 PAPRI HAZRA 4.79 4.79 100 1
2911 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Mahachanda Piped Water Supply Scheme at Bhatar Block , SM/07867 Retrofitting Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Mahachanda village (Iymapara & Mahachanda (Part) habitation) of Mahachanda Piped Water Supply Scheme within Durgapur Sub-Divn. under Burdwan Division, PHE. Dte. [SL. No. : 01] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000411/2020-2021 577/BWD 25/01/2021 15 S. MONDAL 4.86 4.86 100 1
2912 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Mahachanda Piped Water Supply Scheme at Bhatar Block , SM/07867 Retrofitting Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Mahachanda (Part) village (Aymapara & Mahachanda (P) habitation) of Mahachanda Piped Water Supply Scheme within Durgapur Sub-Divn. under Burdwan Division, PHE. Dte [SL. No. : 15] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000461/2020-2021 1466/BWD 18/02/2021 15 BARABELUN NO.-II G.P. UNEMPLOYED CO-OP LABOUR CONTRACT & CONSTRUCTION SOCIETY LTD. 4.86 4.78 98.35 1
2913 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Mahachanda Piped Water Supply Scheme at Bhatar Block , SM/07867 Retrofitting Continuation work order for Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Nunari village (Patuna habitation) & Parhat village (Parhat habitation) of Mahachanda Piped Water Supply Scheme within Durgapur Sub-Divn. under Burdwan Division, PHE. Dte. (Part - B) [SL. No. : 04] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000202/2021-2022 6266/BWD 02/11/2021 15 PAPRI HAZRA 4.86 4.78 98.35 1
2914 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Mahachanda Piped Water Supply Scheme at Bhatar Block , SM/07867 Retrofitting Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Mahachanda village and Mahachanda habitation of MAHACHANDA piped water supply scheme within Durgapur (Bardhaman North) Sub-Division under Burdwan Division, PHE Dte. [Phase-I](Tr No.-527/BWD/2020-21) Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000163/2020-2021 3343/BWD 18/09/2020 30 BIPLAB SAMANTA 4.86 4.86 100 1
2915 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Mahachanda Piped Water Supply Scheme at Bhatar Block , SM/07867 Retrofitting Continuation work order for Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Mahachanda village and Mahachanda habitation of MAHACHANDA piped water supply scheme within Durgapur (Bardhaman North) Sub-Division under Burdwan Division, PHE Dte. (Tr No.-528/BWD/20-21) Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000164/2020-2021 4270/BWD 03/11/2020 30 BIPLAB SAMANTA 4.86 4.86 100 1
2916 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Mahachanda Piped Water Supply Scheme at Bhatar Block , SM/07867 Retrofitting Restoration of damaged flanks during laying of distribution pipe with jhama metal and moorum of Bardhaman Katwa road from Shibpur towards 6th Mile ( From Node 89 -64) of Mahachanda Water Supply Scheme within Durgapur Sub Division Under Burdwan Division, PHE Dte.[SL-D] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000624/2021-2022 165/DSD 16/03/2022 30 PREMANANDA ROY BISWAS 3.89 0.00 0 1
2917 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Mahachanda Piped Water Supply Scheme at Bhatar Block , SM/07867 Retrofitting Restoration of pipeline at 6-Mile_Shibpur-Dharampur along & across Bardhaman-Katwa Road (SH-7) & providing FHTC at Aimapara (Part), Mahachanda (Part), Shibpur, Dharampur, Nunari (Part) Village (Mouza) under MAHACHANDA Piped W/S. Scheme under Burdwan Division, PHE. Dte. Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000277/2021-2022 6934/BWD 13/12/2021 45 PREMANANDA ROY BISWAS 43.33 41.32 95.36 1
2918 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Mahachanda Piped Water Supply Scheme at Bhatar Block , SM/07867 Retrofitting Continuation work order for Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Nunari village (Patuna habitation) & Parhat village (Parhat habitation) of Mahachanda Piped Water Supply Scheme within Durgapur Sub-Divn. under Burdwan Division, PHE. Dte. (Part - A) [SL. No. : 03] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000203/2021-2022 6265/BWD 02/11/2021 15 BIPLAB SAMANTA 4.86 4.86 100 1
2919 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Mahachanda Piped Water Supply Scheme at Bhatar Block , SM/07867 Retrofitting Restoration of damaged flanks during laying of distribution pipe with jhama metal and moorum of Bardhaman Katwa road from Shibpur towards 6th Mile ( From Node 89 -64) of Mahachanda Water Supply Scheme within Durgapur Sub Division Under Burdwan Division, PHE Dte.[SL-D] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000638/2021-2022 165/DSD 16/03/2022 30 OM ENTERPRISE 3.88 3.86 99.48 1
2920 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Mahachanda Piped Water Supply Scheme at Bhatar Block , SM/07867 Retrofitting Extension of Pipeline for Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of Mahachanda Piped Water Supply Scheme , Block- Bhatar within Durgapur (Burdwan North) Sub Division under Burdwan Division, P.H.E. Dte. [Gr.-D] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000478/2021-2022 97/DSD 18/02/2022 30 BIPLAB SAMANTA 3.54 3.54 100 1
2921 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Mahachanda Piped Water Supply Scheme at Bhatar Block , SM/07867 Retrofitting Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Mahachanda village (Shibpur-Dharampur habitation) of Mahachanda Piped Water Supply Scheme within Durgapur Sub-Divn. under Burdwan Division, PHE. Dte. [SL. No. : 02] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000453/2020-2021 578/BWD 25/01/2021 15 PRONAB KUMAR DEY 4.86 4.86 100 1
2922 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Mahachanda Piped Water Supply Scheme at Bhatar Block , SM/07867 Retrofitting Providing leftout water tap connection in different villages for 100% coverage to make it Sajal Gram from existing distribution system within scheme jurisdiction of different Piped Water Supply Schemes within Bhatar Block under Burdwan Division, PHE. Dte. Assistant Engineer ,Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000389/2021-2022 268/BWD 14/01/2022 30 BHARAT CONSTRUCTION 14.17 0.00 0 1
2923 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Mahachanda Piped Water Supply Scheme at Bhatar Block , SM/07867 Retrofitting Laying of parallel line with 90 mm dia uPVC pipe within Node J8-J-48 and providing air valve for improvement of water supply to FHTC at Twara village within MAHACHANDA and its adjoining mouzas W/S Scheme under Durgapur Sub-Division, Burdwan Division, P.H.E. Dte. Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000467/2022-2023 3967/BWD 13/09/2022 30 PAPRI HAZRA 5.26 4.99 94.87 1
2924 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Mahachanda Piped Water Supply Scheme at Bhatar Block , SM/07867 Retrofitting Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Nunari village (Patuna habitation) & Parhat village (Parhat habitation) of Mahachanda Piped Water Supply Scheme within Durgapur Sub-Divn. under Burdwan Division, PHE. Dte. (Part - A) [SL. No. : 03] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer ORD/000454/2020-2021 582/BWD 25/01/2021 15 BIPLAB SAMANTA 4.86 4.86 100 0
2925 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Mahachanda Piped Water Supply Scheme at Bhatar Block , SM/07867 Retrofitting Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Nunari village (Patuna habitation) & Parhat village (Parhat habitation) of Mahachanda Piped Water Supply Scheme within Durgapur Sub-Divn. under Burdwan Division, PHE. Dte. (Part - B) [SL. No. : 04] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer ORD/000459/2020-2021 583/BWD 25/01/2021 15 PAPRI HAZRA 4.86 4.84 99.59 0
2926 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Mahachanda Piped Water Supply Scheme at Bhatar Block , SM/07867 Retrofitting Extension of pipeline at Parhat & Patuna village of Mahachanda and its adjoining mouza's Piped W/S Scheme at Bhatar Block within Durgapur (Bardhaman North) Sub Division under Burdwan Division, P.H.E. Dte. (Gr.-C) Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000107/2021-2022 418/DSD 02/07/2021 30 PAPRI HAZRA 4.18 4.00 95.69 0
2927 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Mahachanda Piped Water Supply Scheme at Bhatar Block , SM/07867 Retrofitting Laying of UPVC pipeline in TAWRA Habitation within Mahachanda PWSS WITHIN Durgapur(Burdwan North ) Sub Division ,PHE Dte, Under Burdwan Division PHE Dte. Assistant Engineer, Durgapur Sub Division, P.H.E. Dte JUNIOR ENGINEER DURGAPUR SUB-DIVISION PHE DTE ORD/000397/2024-2025 622/DSD 05/08/2024 30 MAA MAHAMAYA CONSTRUCTION 4.54 0.00 0 100
2928 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Mahachanda Piped Water Supply Scheme at Bhatar Block , SM/07867 Retrofitting Conducting physical Household Survey at the IMIS reported village for HGJ certification and providing balance FHTC for Har Ghar Jal certification including conducting Gram Sabhas for different IMIS reported villages across the district under Burdwan Division, PHE Dte. AE(HQs),Assistant Engineer ,Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE.,Assistant Engineer, Durgapur Sub Division, P.H.E. Dte JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000428/2024-2025 3107/BWD 12/08/2024 90 TUBGRAM GRAMMYAK UNNAYAN SAMITY 309.60 0.00 0 50
2929 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Mahachanda Piped Water Supply Scheme at Bhatar Block , SM/07867 Retrofitting Water tap connection in each house hold from existing distribution system within Scheme jurisdiction in Parhat (Part-B) village of MAHACHANDA piped W/S Scheme within Durgapur Sub- Division (Burdwan North) under Burdwan Division PHE Dte. Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer2, Durgapur Sub-Division, PHE Dte. ORD/000938/2023-2024 910/DSD 15/12/2023 434 OM ENTERPRISE 0.96 0.00 0 100
2930 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Mahachanda Piped Water Supply Scheme at Bhatar Block , SM/07867 Retrofitting Water tap connection in each house hold from existing distribution system within Scheme jurisdiction in Parhat (Part-A) village of MAHACHANDA piped W/S Scheme within Durgapur Sub- Division (Burdwan North) under Burdwan Division PHE Dte. Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer2, Durgapur Sub-Division, PHE Dte. ORD/000939/2023-2024 911/DSD 15/12/2023 434 OM ENTERPRISE 0.95 0.00 0 100
2931 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Mahachanda Piped Water Supply Scheme at Bhatar Block , SM/07867 Retrofitting Arrangement of drinking water supply by installation of solar submersible pump including sinking of 200 mm. dia. Tube well 150 Mtr. Deep by direct rotary rig method, Laying dist. System, FHTC for Nunari Village under MAHACHANDA Piped W/S. Scheme, Block Bhatar under Burdwan Division, PHE Dte. Assistant Engineer, Durgapur Sub Division, P.H.E. Dte JUNIOR ENGINEER DURGAPUR SUB-DIVISION PHE DTE ORD/000225/2024-2025 2525/BWD 03/07/2024 120 THE BUSINESS ENGINEERS INDIA 28.00 0.00 0 25
2932 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Mahachanda Piped Water Supply Scheme at Bhatar Block , SM/07867 Retrofitting Laying of UPVC and HDPE Pipe Line at Bostom Para of MAHACHANDA W/S Scheme within BHATAR Block Under Durgapur Sub Division , Under Burdwan Division PHE Dte ORD/001421/2024-2025 297/DSD 20/02/2025 30 BAMDEB CONSTRUCTION & CO 1.93 0.00 0 0
2933 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Golgram Piped Water Supply Scheme at Galsi-I Block , SM/07869 Retrofitting Formal Work Order for providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of Golgram Piped Water Supply Scheme at Golgram Village (Mouza), Galsi-I Block under Burdwan Division, PHE Dte. [Agreement No. 100/SE/CC/PHE/Dte of 2020-2021.] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000425/2020-2021 638/BWD 25/01/2021 60 SHUBHRA KANTI GHOSH 63.87 19.17 30.01 1
2934 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Golgram Piped Water Supply Scheme at Galsi-I Block , SM/07869 Retrofitting Construction of approach road from entrance to OHR, Pump House and filling of low land around Over Head Reservoir with carried earth at 1st Tube well site of Golgram & its adjoining mouzas water supply scheme, Block-Galsi-I, under Burdwan Division, PHE Dte. [SL-D] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000122/2022-2023 335/DSD 27/06/2022 30 CHOUDHURY INFRA 1.86 0.00 0 1
2935 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Golgram Piped Water Supply Scheme at Galsi-I Block , SM/07869 Retrofitting Making Connection with Rising Main And Over Head Reservoir of Golgram W/S Scheme within Durgapur Sub-Division in Galsi-I Block under Burdwan Division, P.H.E. Dte. [Gr.-G] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000135/2022-2023 348/DSD 30/06/2022 15 RANADHIR SINHA 0.33 0.32 96.97 1
2936 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Golgram Piped Water Supply Scheme at Galsi-I Block , SM/07869 Retrofitting Hire & fuel charges of vehicle (Car No.-WB-37C-8293) for the office of the Assistant Engineer, Durgapur Sub-Division, PHE Dte. for the month of February'23. BILL/00117/2023-2024 13/JJM 17/04/2023 SUJAUDDIN SEKH 0.36 0.00 0 0
2937 PURBA BARDHAMAN Durgapur W/S Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Golgram Piped Water Supply Scheme at Galsi-I Block , SM/07869 Retrofitting Acceptance cum Formal Work Order for the work of Balance work for Distribution System (CI/DI/UPVC), Earth Work & Concrete Work for GOLGRAM PWSS Schemes of GALSI-I Block under Durgapur Water Supply Division, PHE Dte. Assistant Engineer-II Contractual Junior Engineer_1 ORD/000050/2024-2025 767/DWSD 06/06/2024 25 SHUBHRA KANTI GHOSH 1.12 0.00 0 100
2938 PURBA BARDHAMAN Durgapur W/S Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Golgram Piped Water Supply Scheme at Galsi-I Block , SM/07869 Retrofitting Acceptance cum Formal Work Order for the work of " Sinking of 300 x 200mm x 150 mtr depth by DR Rig, Repairing & Renovation of existing OHR, Construction of 01 (One) 5.25 x 3.25m No Pump House cum Chlorine Room including laying UPVC distribution system (LDS) and interconnection of PWSS & construction of Boundary wall & other allied works at Golgram under GOLGRAM PWSS, Block- Galsi-I, Dist- Purba Bardhman under Durgapur W/S Division, PHE Dte. Assistant Engineer-II Contractual Junior Engineer_1 ORD/000045/2024-2025 771/DWSD 06/06/2024 210 ARISH CONSTRUCTION 83.56 0.00 0 60
2939 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Golgram Piped Water Supply Scheme at Galsi-I Block , SM/07869 Retrofitting Providing leftout water tap connection in different villages for 100% coverage to make it Sajal Gram from existing distribution system within scheme jurisdiction of different Piped Water Supply Schemes within Galsi ¿ I Block under Burdwan Division, PHE. Dte._2ND CALL. Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000673/2021-2022 1738/BWD 28/03/2022 30 JYOTI ENTERPRISE 5.72 0.00 0 100
2940 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Debshala Piped Water Supply Scheme at Ausgram-II Block , SM/07824 Retrofitting Extension of Pipeline with providing Functional Household Tap Connection (FHTC) at Raibandh, Raykona & Kankora adibasipara of DEBSALA and its adjoining mouza's Piped W/S Scheme at Ausgram-II Block within Durgapur Sub Division under Burdwan Division, P.H.E. Dte. [Gr.-C] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer1, Durgapur Sub-Division, PHE Dte. ORD/000454/2021-2022 75/DSD 11/02/2022 30 BHARAT CONSTRUCTION 4.33 4.30 99.31 1
2941 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Debshala Piped Water Supply Scheme at Ausgram-II Block , SM/07824 Retrofitting Extension of Pipeline with providing Functional Household Tap Connection (FHTC) at Debsala Village,Kankora & Pathuria Adibasipara of DEBSALA and its adjoining mouza's Piped W/S Scheme at Ausgram-II Block within Durgapur Sub Division under Burdwan Division, P.H.E. Dte. [Gr.-D] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer1, Durgapur Sub-Division, PHE Dte. ORD/000456/2021-2022 76/DSD 11/02/2022 30 D.M. ENTERPRISE 4.45 4.29 96.4 1
2942 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Debshala Piped Water Supply Scheme at Ausgram-II Block , SM/07824 Retrofitting Providing leftout water tap connection in different villages for 100% coverage to make it Sajal Gram from existing distribution system within scheme jurisdiction of different Piped Water Supply Schemes within Ausgram-II Block under Burdwan Division, PHE. Dte. Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000472/2021-2022 940/BWD 17/02/2022 30 NANDY UDYOG 11.82 0.00 0 0
2943 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Debshala Piped Water Supply Scheme at Ausgram-II Block , SM/07824 Retrofitting Providing functional household tap connection (FHTC) from existing distribution system within command area of DEBSHALA piped water supply scheme at Bagbati (02 Nos. habitation), Kakra, Satla (02 Nos. habitation), Gobindapur (03 Nos Habitation), Debshala (02 Nos. Habitation Part), Kankra (Part) & Paduma (02 Nos. habitation Part) village, Ausgram-II Block under Burdwan Division, PHE Dte. Junior Engineer1, Durgapur Sub-Division, PHE Dte. ORD/000563/2020-2021 4998/BWD 10/12/2020 90 SAI TUBE CO. 59.61 40.73 68.33 1
2944 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Debshala Piped Water Supply Scheme at Ausgram-II Block , SM/07824 Retrofitting Restoration of village and drains at Kakra village for DEBSHALA piped water supply scheme, Block-Ausgram-II under Burdwan Division, PHE Dte. [Gr.-L] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer1, Durgapur Sub-Division, PHE Dte. ORD/000285/2021-2022 669/DSD 25/11/2021 15 SAI TUBE CO. 3.97 0.00 0 1
2945 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Debshala Piped Water Supply Scheme at Ausgram-II Block , SM/07824 Retrofitting Restoration of village road and drains at part of RAYKONA & KAKRA for Debshala piped water supply scheme, Block-Ausgram-II under Burdwan Division, PHE Dte. [Gr.-M] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer1, Durgapur Sub-Division, PHE Dte. ORD/000284/2021-2022 668/DSD 25/11/2021 15 SAI TUBE CO. 3.91 0.00 0 1
2946 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Debshala Piped Water Supply Scheme at Ausgram-II Block , SM/07824 Retrofitting Relaying of pipe line damaged by construction of road with drain at Kankora and installation of Valves to regulate water supply at Bilashpur & Gobindapur of DEBSALA and its adjoining mouza's Piped W/S Scheme at Ausgram-II Block within Durgapur Sub Division under Burdwan Division, P.H.E. Dte.[SL-E] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer1, Durgapur Sub-Division, PHE Dte. ORD/000625/2021-2022 166/DSD 16/03/2022 30 BHARAT CONSTRUCTION 2.53 2.52 99.6 1
2947 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Debshala Piped Water Supply Scheme at Ausgram-II Block , SM/07824 Retrofitting Extension of pipeline of DEBSHALA and its adjoining mouzas piped water supply scheme at Ausgram-II Block within Durgapur Sub-Division under Burdwan Division, PHE Dte. Junior Engineer1, Durgapur Sub-Division, PHE Dte. ORD/000771/2020-2021 1568/BWD 22/02/2021 45 BHARAT CONSTRUCTION 41.01 40.66 99.15 0
2948 PURBA BARDHAMAN Durgapur W/S Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Debshala Piped Water Supply Scheme at Ausgram-II Block , SM/07824 Retrofitting Acceptance cum Formal Work Order for Big Dia Tubewell Surging by using suitable air compressor at PH-1 & PH-2 of Debshala PWSS Scheme under Durgapur W/S Division, PHE Dte. Assistant Engineer-II Contractual Junior Engineer_1 ORD/000135/2024-2025 1212/DWSD 23/08/2024 10 GHOSH & ROY ENTERPRISE 0.66 0.00 0 100
2949 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Majhergram Piped Water Supply Scheme , SM/07825 Retrofitting Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Sihigram village and Adibashipara, Hindupara (Sihigram), Kamarpara & Makarpara habitation of Majhergram piped water supply scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. [Phase-I](Tr No.-605/BWD/2020-21) Assistant Engineer ORD/000249/2020-2021 4125/BWD 16/10/2020 30 N.S. ENTERPRISE 4.86 4.86 100 1
2950 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Majhergram Piped Water Supply Scheme , SM/07825 Retrofitting Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Dhanya Kherur village and Deleypara, Malpara, Mandalpara, Paschimpara & Purba Daspara habitation of Majhergram piped water supply scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. [Phase-I](Tr No.-385/BWD/2020-21) Assistant Engineer ORD/000257/2020-2021 4124/BWD 16/10/2020 30 SUBRATA GUPTA 4.86 4.86 100 1
2951 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Majhergram Piped Water Supply Scheme , SM/07825 Retrofitting Continuation work order for Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Dhanya Kherur village and Duleypara, Malpara, Mandalpara, Paschimpara & Purba Daspara Habitation of Majhergram piped water supply scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. [Phase-I] Assistant Engineer ORD/000607/2020-2021 260/BWD 13/01/2021 30 SUBRATA GUPTA 4.86 4.86 100 1
2952 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Majhergram Piped Water Supply Scheme , SM/07825 Retrofitting Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of Majhergram Piped Water Supply Scheme at Sihigram (P) (Paschimpara habs.), Sonagachi (3 Nos. habs.), Majhergram (8 Nos. habs.) & Ganguria (3 Nos. habs), Monteswar Block under Burdwan Division, PHE Dte. Assistant Engineer ORD/000639/2020-2021 1497/BWD 18/02/2021 60 INDIAN ENGINEERS CO.-OPERATIVE SOCIETY LTD. 57.97 45.30 78.14 1
2953 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Majhergram Piped Water Supply Scheme , SM/07825 Retrofitting Extension of 63 mm dia UPVC pipeline to provide house connection to the beneficiaries of Sihigram village of Majhergram water supply scheme within Kalna Sub-Division under Burdwan Division, PHE Dte.[Sl No.-D] Assistant Engineer ORD/000859/2020-2021 141/KSD 12/02/2021 30 GOUTAM DEY 3.14 2.96 94.27 1
2954 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Majhergram Piped Water Supply Scheme , SM/07825 Retrofitting Supply of materials for different water supply scheme under Burdwan Division, PHE Dte. VCH/001237/2021-2022 1132/DW 26/02/2022 EXECUTIVE ENGINEER, RESOURCES DIVISION, P.H.E. DTE. 221.00 0.00 0 0
2955 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Majhergram Piped Water Supply Scheme , SM/07825 Retrofitting Continuation work for Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Sihigram village and Adibasipara, Hindupara (Sihigram), Kamarpara & Makarpara habitation of Majhergram Piped Water Supply Scheme within Kalna Sub-Divn. under Burdwan Division, PHE. Dte. [Phase - I] [GROUP : ¿11B¿] Assistant Engineer ORD/000658/2021-2022 1667/BWD 23/03/2022 30 N.S. ENTERPRISE 4.16 3.66 87.98 1
2956 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Majhergram Piped Water Supply Scheme , SM/07825 Retrofitting Construction of sanitary Latrine and water supply arrangement at Head Work Site of Majhigram Singot piped water supply schemes under Mongalkote Block under Katwa Sub-Division under Burdwan Division, PHE Dte.[Sl No-01] Assistant Engineer ORD/000593/2021-2022 159/KTS 24/02/2022 21 BABUL SK 1.76 0.00 0 1
2957 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Majhergram Piped Water Supply Scheme , SM/07825 Retrofitting Hire & fuel charges of vehicle (Car No.-WB-41J-6795) for the office of the Deputy Superintending Engineer, Central Circle, PHE Dte. for the month of November & December'22. BILL/00464/2022-2023 1131/JJM 28/02/2023 MD HASIN 0.72 0.00 0 0
2958 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Majhergram Piped Water Supply Scheme , SM/07825 Retrofitting Material Requisition To Resource Division RTOR000125/2021-2022 1106/BWD 26/02/2022 Resource Division 44.82 0.00 0 0
2959 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Majhergram Piped Water Supply Scheme , SM/07825 Retrofitting Restoration of Nepakuli -Baghnapara road from 1.50 km to 2.50 km damaged due to laying of underground water pipe line by PHE with box cutting and Jhama moorum consolidation under Kalna Highway Sub-Division of Burdwan South Highway Division , P.W (Roads) Dte. during the year 2023-2024 BILL/00892/2024-2025 1025/JJM 05/10/2024 EXECUTIVE ENGINEER BURDWAN SOUTH HIGHWAY DIVISION P.W. (ROADS) DTE. 1.74 0.00 0 null
2960 PURBA BARDHAMAN Burdwan Division Augmentation of ground water based SANKARI PWSS to accommodate FHTC in KHANDOGHOSH block under Burdwan Sub Division of Burdwan Division in Purba Bardhaman District , SM/09405 Augmentation Supply of materials for different water supply scheme under Burdwan Division, PHE Dte. VCH/001578/2021-2022 1207/DW 10/03/2022 EXECUTIVE ENGINEER, RESOURCES DIVISION, P.H.E. DTE. 3,005.00 0.00 0 0
2961 PURBA BARDHAMAN Burdwan Division Augmentation of ground water based SANKARI PWSS to accommodate FHTC in KHANDOGHOSH block under Burdwan Sub Division of Burdwan Division in Purba Bardhaman District , SM/09405 Augmentation Route Survey & Preparation of DPR for Sankari W/S Scheme under Khandaghosh Block under Burdwan Sub-Division under Burdwan Division PHE Dte. Sl No.10. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000498/2021-2022 185/BSD 31/01/2022 30 RADIANT 2.52 2.52 100 1
2962 PURBA BARDHAMAN Burdwan Division Augmentation of ground water based SANKARI PWSS to accommodate FHTC in KHANDOGHOSH block under Burdwan Sub Division of Burdwan Division in Purba Bardhaman District , SM/09405 Augmentation Supply and delivery of different dia. CIDF sluice valve for Augmentation of SANKARI Piped Water Supply Scheme under Burdwan Division, P.H.E. Dte._SL No. 06 Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000617/2021-2022 140/AE/HQ 16/03/2022 10 MAKALI ENGINEERING CORPORATION 4.52 0.00 0 0
2963 PURBA BARDHAMAN Burdwan Division Augmentation of ground water based SANKARI PWSS to accommodate FHTC in KHANDOGHOSH block under Burdwan Sub Division of Burdwan Division in Purba Bardhaman District , SM/09405 Augmentation Augmentation of SANKARI Piped Water Supply Scheme with LDS, Rising Main, Constn. of 250 cum capacity OHR with 20.0 Mtr. staging height inclusive of soil test & FHTC under Khandaghosh Block, District - Purba Bardhaman. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000527/2021-2022 1119/BWD 28/02/2022 360 UNIQUE AGENCY 208.48 177.38 85.08 100
2964 PURBA BARDHAMAN Burdwan Division Augmentation of ground water based SANKARI PWSS to accommodate FHTC in KHANDOGHOSH block under Burdwan Sub Division of Burdwan Division in Purba Bardhaman District , SM/09405 Augmentation Material Requisition To Resource Division RTOR000204/2021-2022 1527/BWD 15/03/2022 Resource Division 0.37 0.00 0 0
2965 PURBA BARDHAMAN Burdwan Division Augmentation of ground water based SANKARI PWSS to accommodate FHTC in KHANDOGHOSH block under Burdwan Sub Division of Burdwan Division in Purba Bardhaman District , SM/09405 Augmentation Material Requisition To Resource Division RTOR000054/2021-2022 529/BWD 27/01/2022 Resource Division 6.82 0.00 0 0
2966 PURBA BARDHAMAN Burdwan Division Augmentation of ground water based SANKARI PWSS to accommodate FHTC in KHANDOGHOSH block under Burdwan Sub Division of Burdwan Division in Purba Bardhaman District , SM/09405 Augmentation Material Requisition To Resource Division RTOR000093/2021-2022 903/BWD 15/02/2022 Resource Division 18.21 0.00 0 0
2967 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED PALITA PWSS TO ACCOMMODATE FHTC IN KETUGRAM-I BLOCK UNDER KATWA SUB-DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/09413 Augmentation Route Survey and preparation of DPR for PALITA PWSS under Ketugram-I Block under Katwa Sub-Division under Burdwan Division PHE Dte.[Sl No-04] Assistant Engineer ORD/000540/2021-2022 55/KTS 25/01/2022 21 RADIANT 2.78 2.78 100 1
2968 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED PALITA PWSS TO ACCOMMODATE FHTC IN KETUGRAM-I BLOCK UNDER KATWA SUB-DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/09413 Augmentation Supply of materials for different water supply scheme under Burdwan Division, PHE Dte. VCH/001578/2021-2022 1207/DW 10/03/2022 EXECUTIVE ENGINEER, RESOURCES DIVISION, P.H.E. DTE. 3,005.00 0.00 0 0
2969 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED PALITA PWSS TO ACCOMMODATE FHTC IN KETUGRAM-I BLOCK UNDER KATWA SUB-DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/09413 Augmentation Supply and delivery of different dia. CIDF sluice valve for Augmentation of PALITA Piped Water Supply Scheme under Burdwan Division, P.H.E. Dte._Sl. No. 09 Assistant Engineer ORD/000620/2021-2022 143/AE/HQ 16/03/2022 10 MAKALI ENGINEERING CORPORATION 4.52 0.00 0 0
2970 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED PALITA PWSS TO ACCOMMODATE FHTC IN KETUGRAM-I BLOCK UNDER KATWA SUB-DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/09413 Augmentation Material Requisition To Resource Division RTOR000044/2021-2022 543/BWD 27/01/2022 Resource Division 15.49 0.00 0 0
2971 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED PALITA PWSS TO ACCOMMODATE FHTC IN KETUGRAM-I BLOCK UNDER KATWA SUB-DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/09413 Augmentation Material Requisition To Resource Division RTOR000207/2021-2022 1530/BWD 15/03/2022 Resource Division 0.37 0.00 0 0
2972 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED PALITA PWSS TO ACCOMMODATE FHTC IN KETUGRAM-I BLOCK UNDER KATWA SUB-DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/09413 Augmentation Material Requisition To Resource Division RTOR000107/2021-2022 929/BWD 16/02/2022 Resource Division 26.89 0.00 0 0
2973 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED PALITA PWSS TO ACCOMMODATE FHTC IN KETUGRAM-I BLOCK UNDER KATWA SUB-DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/09413 Augmentation Supply of 1 (one) No. Inspection Vehicle for different JJM Related Works as and when required including supply of driver and fuels (Minimum 8 Hours of duty) under Katwa Sub-Division within Burdwan Division, P.H.E. Dte. Consider 96.00 Km run per Day.(Sl No-1) ORD/000510/2023-2024 499/KTS 22/05/2023 70 M/S MUNMUN DEY 0.90 0.00 0 100
2974 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED PALITA PWSS TO ACCOMMODATE FHTC IN KETUGRAM-I BLOCK UNDER KATWA SUB-DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/09413 Augmentation Continuation order for Supply of 1 (one) No. Inspection Vehicle for different JJM Related Works as and when required including supply of driver and fuels (Minimum 8 Hours of duty) under Katwa Sub-Division within Burdwan Division, P.H.E. Dte. Consider 96.00 Km run per Day. (Sl No-1) Assistant Engineer JUNIOR ENGINEER KATWA SUB-DIVISION PHE DTE ORD/000930/2023-2024 1016/KTS 20/09/2023 23 M/S MUNMUN DEY 0.30 0.00 0 0
2975 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED PALITA PWSS TO ACCOMMODATE FHTC IN KETUGRAM-I BLOCK UNDER KATWA SUB-DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/09413 Augmentation Augmentation of PALITA Piped Water Supply Scheme with LDS, FHTC, Rising main, Construction of 350 cum capacity OHR with 20.0 mtr. Staging height inclusive of soil investigation, Construction of boundarywall at HW and 2nd TW site with repairing of Pump house -I & II under Ketugram-I Block, District:- Purba-Burdwan. Assistant Engineer JUNIOR ENGINEER R.W.S. BURDWAN SUB-DIVISION PHE DTE ORD/000029/2022-2023 2139/BWD 25/04/2022 365 M/S GUPTA ENTERPRISE 472.81 390.85 82.67 98
2976 PURBA BARDHAMAN Burdwan Division Providing Functional House hold Tap Connection (FHTC) by retrofitting at Dogachia mouza within the command area of Amra piped Water Supply Scheme at Jamalpur Block under Burdwan Division, P.H.E. DTE. (Pt.-B) , SM/08702 Retrofitting Laying of 100 mm dia D.I Pipe for Road widening from 4 lane to 6 lane of NH2 at chainage 596+286 & 596+086 & 596+ 486 at Amra Water supply within Jamalpur Block,under Burdwan Division,PHE Dte". Group : A. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000101/2022-2023 982/BSD 16/06/2022 30 DEY NIRMAN 2.89 0.00 0 0
2977 PURBA BARDHAMAN Burdwan Division Providing Functional House hold Tap Connection (FHTC) by retrofitting at Dogachia mouza within the command area of Amra piped Water Supply Scheme at Jamalpur Block under Burdwan Division, P.H.E. DTE. (Pt.-B) , SM/08702 Retrofitting Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of Amra Piped Water Supply Scheme at Amra (2 Nos Habitation Part) & Dogachia Village (Mouza), Jamalpur Block under Burdwan Division, PHE Dte._3rd CALL. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000008/2021-2022 3138/BWD 03/06/2021 45 D.M. ENTERPRISE 57.42 28.82 50.19 1
2978 PURBA BARDHAMAN Burdwan Division Providing Functional House hold Tap Connection (FHTC) by retrofitting at Dogachia mouza within the command area of Amra piped Water Supply Scheme at Jamalpur Block under Burdwan Division, P.H.E. DTE. (Pt.-B) , SM/08702 Retrofitting Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of AMRA Piped Water Supply Scheme (Vill-Dogechia, Habitation- Dogechia ) at Jamalpur Block of Burdwan Sub-Division under Burdwan Division, PHE Dte.Gr.A. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000386/2021-2022 57/BSD 13/01/2022 30 DEY NIRMAN 4.81 0.00 0 1
2979 PURBA BARDHAMAN Burdwan Division Providing Functional House hold Tap Connection (FHTC) by retrofitting at Dogachia mouza within the command area of Amra piped Water Supply Scheme at Jamalpur Block under Burdwan Division, P.H.E. DTE. (Pt.-B) , SM/08702 Retrofitting Extension of pipeline at AMRA water supply scheme at different villages (Tengaberia, Badpur & Kolupukur) FHTC of Jamalpur Block under Burdwan Division, PHE Dte.[Gr.-F] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000561/2021-2022 1374/BSD 05/10/2021 30 D.M. ENTERPRISE 4.74 3.81 80.38 1
2980 PURBA BARDHAMAN Burdwan Division Providing Functional House hold Tap Connection (FHTC) by retrofitting at Dogachia mouza within the command area of Amra piped Water Supply Scheme at Jamalpur Block under Burdwan Division, P.H.E. DTE. (Pt.-B) , SM/08702 Retrofitting Construction of Boundary wall at 3rd Tube well site of Dogachia Mouza of Amra water supply scheme under Jamalpur block under Burdwan Division, PHE Dte. [Length-59 Mtr][Gr.-F] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000557/2021-2022 1028/BSD 05/08/2021 45 MUKHERJEE ENTERPRISE 4.45 0.00 0 1
2981 PURBA BARDHAMAN Burdwan Division Providing Functional House hold Tap Connection (FHTC) by retrofitting at Dogachia mouza within the command area of Amra piped Water Supply Scheme at Jamalpur Block under Burdwan Division, P.H.E. DTE. (Pt.-B) , SM/08702 Retrofitting Construction of concrete road and rest portion of boundary wall at Head works site of AMRA Piped Water Supply Scheme in Jamalpur Block under Burdwan Division, PHE Dte. (Length - 122 Mtr., 45 Nos Column). Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. Junior Engineer, R.W.S. Burdwan Sub Division, P.H.E. Dt ORD/000146/2022-2023 3100/BWD 14/07/2022 30 CHAUDHURI ENTERPRISE 7.68 7.74 100.78 0
2982 PURBA BARDHAMAN Burdwan Division Providing Functional House hold Tap Connection (FHTC) by retrofitting at Dogachia mouza within the command area of Amra piped Water Supply Scheme at Jamalpur Block under Burdwan Division, P.H.E. DTE. (Pt.-B) , SM/08702 Retrofitting Repairing and replace of damaged UPVC Pipeline with installation and construction of valve chamber for control of water flow within command area of AMRA Piped W/S Scheme at Dogachia habitation,Jamalpur Development Block under Burdwan Division,PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. RWS_JAMALPUR ORD/000806/2022-2023 429/BSD 15/03/2023 30 DEY NIRMAN 0.89 0.87 97.75 100
2983 PURBA BARDHAMAN Burdwan Division Providing Functional House hold Tap Connection (FHTC) by retrofitting at Dogachia mouza within the command area of Amra piped Water Supply Scheme at Jamalpur Block under Burdwan Division, P.H.E. DTE. (Pt.-B) , SM/08702 Retrofitting Providing FHTC for Dogachia Mouza [(Habitation (Village)] for AMRA piped W/S Scheme, Jamalpur Dev. Block under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000068/2023-2024 2019/BWD 28/04/2023 30 DEY NIRMAN 20.61 9.00 43.67 100
2984 PURBA BARDHAMAN Burdwan Division Providing Functional House hold Tap Connection (FHTC) by retrofitting at Kalyanbati, Narayapur and Radhakrishnapur mouzas within the command area of Sudpur piped Water Supply Scheme at Katwa-I Block under Burdwan Division, P.H.E. DTE. (Pt.-B) , SM/08717 Retrofitting Construction of Pump House cum chlorine room without sanitary and water supply arrangement at Head Work Site to departmental drawing (Size 3.60 mtr x 3.00 mtr room) for SUDPUR water supply schemes under Katwa Sub-Division within Burdwan Division, PHE Dte.(Sl No-7) Assistant Engineer ORD/000146/2021-2022 595/KTS 06/09/2021 45 BABUL SK 2.99 2.62 87.63 1
2985 PURBA BARDHAMAN Burdwan Division Providing Functional House hold Tap Connection (FHTC) by retrofitting at Kalyanbati, Narayapur and Radhakrishnapur mouzas within the command area of Sudpur piped Water Supply Scheme at Katwa-I Block under Burdwan Division, P.H.E. DTE. (Pt.-B) , SM/08717 Retrofitting Extension of pipe line from the existing Distribution System within scheme jurisdiction at Rayerpara, Purba and Paschim Bijoynagar village under SUDPUR PWSS under Katwa Sub-Division under Burdwan Division PHE Dte [Sl - 5 ] Assistant Engineer JUNIOR ENGINEER KATWA SUB-DIVISION PHE DTE ORD/000125/2021-2022 565/KTS 31/08/2021 15 HAMID SK 3.60 0.64 17.78 1
2986 PURBA BARDHAMAN Burdwan Division Providing Functional House hold Tap Connection (FHTC) by retrofitting at Kalyanbati, Narayapur and Radhakrishnapur mouzas within the command area of Sudpur piped Water Supply Scheme at Katwa-I Block under Burdwan Division, P.H.E. DTE. (Pt.-B) , SM/08717 Retrofitting Extension of pipe line from the existing Distribution System within scheme jurisdiction at Sudpur, Lokpur & Narayanpur village under SUDPUR PWSS under Katwa Sub-Division under Burdwan Division PHE Dte [Sl - 4 ] Assistant Engineer JUNIOR ENGINEER KATWA SUB-DIVISION PHE DTE ORD/000120/2021-2022 564/KTS 31/08/2021 15 BABUL SK 2.42 2.42 100 1
2987 PURBA BARDHAMAN Burdwan Division Providing Functional House hold Tap Connection (FHTC) by retrofitting at Kalyanbati, Narayapur and Radhakrishnapur mouzas within the command area of Sudpur piped Water Supply Scheme at Katwa-I Block under Burdwan Division, P.H.E. DTE. (Pt.-B) , SM/08717 Retrofitting Supplying and laying of valves along with construction of valve chamber at the existing distribution pipe line of Sudpur PWSS under Katwa Sub-Division under Burdwan Division, PHE Dte [Sl No-05] Assistant Engineer JUNIOR ENGINEER KATWA SUB-DIVISION PHE DTE ORD/000158/2022-2023 441/KTS 27/06/2022 30 MD HASIN 0.86 0.85 98.84 1
2988 PURBA BARDHAMAN Burdwan Division Providing Functional House hold Tap Connection (FHTC) by retrofitting at Kalyanbati, Narayapur and Radhakrishnapur mouzas within the command area of Sudpur piped Water Supply Scheme at Katwa-I Block under Burdwan Division, P.H.E. DTE. (Pt.-B) , SM/08717 Retrofitting Detail route survey, design of distribution network and preparation of estimate, drawing & DPR for providing FHTC in the scheme SRIKHANDA, SUDPUR PWSS (Sl No-3) Assistant Engineer JUNIOR ENGINEER KATWA SUB-DIVISION PHE DTE ORD/000071/2023-2024 395/KTS 13/04/2023 30 SIRCON ENGINEERING SERVICES 2.48 2.48 100 100
2989 PURBA BARDHAMAN Burdwan Division Providing Functional House hold Tap Connection (FHTC) by retrofitting at Kalyanbati, Narayapur and Radhakrishnapur mouzas within the command area of Sudpur piped Water Supply Scheme at Katwa-I Block under Burdwan Division, P.H.E. DTE. (Pt.-B) , SM/08717 Retrofitting Supplying and laying inter-connection from Pump no.-3 to rising main of Sudpur PWSS under Katwa Sub-Division under Burdwan Division, PHE Dte.[Sl No-5] Assistant Engineer JUNIOR ENGINEER KATWA SUB-DIVISION PHE DTE ORD/000373/2023-2024 672/KTS 22/06/2023 30 HAMID SK 0.93 0.00 0 100
2990 PURBA BARDHAMAN Burdwan Division Augmentation of ground water based NABABHAT PWSS to accommodate FHTC in BURDWAN-I block under Burdwan Sub Division of Burdwan Division in Purba Bardhaman District , SM/09489 Augmentation Supply of materials for different water supply scheme under Burdwan Division, PHE Dte. VCH/001578/2021-2022 1207/DW 10/03/2022 EXECUTIVE ENGINEER, RESOURCES DIVISION, P.H.E. DTE. 3,005.00 0.00 0 0
2991 PURBA BARDHAMAN Burdwan Division Augmentation of ground water based NABABHAT PWSS to accommodate FHTC in BURDWAN-I block under Burdwan Sub Division of Burdwan Division in Purba Bardhaman District , SM/09489 Augmentation Route Survey & Preparation of DPR for Nababhat W/S Scheme under Burdwan-I Block under Burdwan Sub-Division under Burdwan Division PHE Dte. Sl. No.14. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000503/2021-2022 189/BSD 31/01/2022 30 RADIANT 2.87 2.86 99.65 1
2992 PURBA BARDHAMAN Burdwan Division Augmentation of ground water based NABABHAT PWSS to accommodate FHTC in BURDWAN-I block under Burdwan Sub Division of Burdwan Division in Purba Bardhaman District , SM/09489 Augmentation Construction of boundary wall at East side of Nababhat PHE Complex Burdwan Division, PHE Dte. (Length-106.0Mtr, Col-37 Nos.) Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000431/2021-2022 4664/BWD 10/09/2021 30 MANAS KUMAR CHATTERJEE 7.89 8.03 101.77 1
2993 PURBA BARDHAMAN Burdwan Division Augmentation of ground water based NABABHAT PWSS to accommodate FHTC in BURDWAN-I block under Burdwan Sub Division of Burdwan Division in Purba Bardhaman District , SM/09489 Augmentation Wall Painting at East Side Boundary Wall of Nababhat PHE Complex for IEC Programme for FHTC WORK under Burdwan Sub-Division, PHE Dte. Gr. A. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000507/2022-2023 1067/BSD 27/06/2022 7 FIVE HURDS ENGINEERING FARM 0.40 0.39 97.5 1
2994 PURBA BARDHAMAN Burdwan Division Augmentation of ground water based NABABHAT PWSS to accommodate FHTC in BURDWAN-I block under Burdwan Sub Division of Burdwan Division in Purba Bardhaman District , SM/09489 Augmentation Supply and delivery of different dia. CIDF sluice valve for Augmentation of Paharhati, Nababhat, Shyamsundar & Dewandighi-Mirzapur Piped Water Supply Scheme within Burdwan Sub-Division under Burdwan Division, P.H.E. Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000519/2022-2023 4703/BWD 19/10/2022 20 SSPR VALVE MANUFACTURING PVT LTD. 14.45 0.00 0 1
2995 PURBA BARDHAMAN Burdwan Division Augmentation of ground water based NABABHAT PWSS to accommodate FHTC in BURDWAN-I block under Burdwan Sub Division of Burdwan Division in Purba Bardhaman District , SM/09489 Augmentation Land Development at East Side of Office Building under Nababhat PHE Complex under Burdwan Sub-Division in Burdwan Division,PHE Dte. Gr.D. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000466/2021-2022 277/BSD 15/02/2022 30 MANAS KUMAR CHATTERJEE 3.17 3.17 100 1
2996 PURBA BARDHAMAN Burdwan Division Augmentation of ground water based NABABHAT PWSS to accommodate FHTC in BURDWAN-I block under Burdwan Sub Division of Burdwan Division in Purba Bardhaman District , SM/09489 Augmentation Construction of boundary wall (with main gate) at west side of Nababhat PHE complex of Augmentation of Nababhat under Burdwan Division, PHE Dte. (Length-110 Mtr, Col-45 Nos.) Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000935/2021-2022 6254/BWD 01/11/2021 30 SUROVI CONSTRUCTION AND GENERAL ORDER SUPPLIERS 7.05 6.59 93.48 0
2997 PURBA BARDHAMAN Burdwan Division Augmentation of ground water based NABABHAT PWSS to accommodate FHTC in BURDWAN-I block under Burdwan Sub Division of Burdwan Division in Purba Bardhaman District , SM/09489 Augmentation Sinking of 300 X 200mm dia Tube Well 150 mtr. Depth by D.R. Rig method using UPVC pipe (CM) and UPVC Medium Well Screen (RMS) for Augmentation of NABABHAT & its adjoining mouzas Piped Water Supply Scheme, Block - Burdwan - I, Dist - Purba Bardhaman under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000552/2022-2023 5194/BWD 24/11/2022 30 ANIRUDDHA FARUQUE 11.24 9.61 85.5 1
2998 PURBA BARDHAMAN Burdwan Division Augmentation of ground water based NABABHAT PWSS to accommodate FHTC in BURDWAN-I block under Burdwan Sub Division of Burdwan Division in Purba Bardhaman District , SM/09489 Augmentation Material Requisition To Resource Division RTOR000162/2021-2022 1322/BWD 08/03/2022 Resource Division 12.13 0.00 0 0
2999 PURBA BARDHAMAN Burdwan Division Augmentation of ground water based NABABHAT PWSS to accommodate FHTC in BURDWAN-I block under Burdwan Sub Division of Burdwan Division in Purba Bardhaman District , SM/09489 Augmentation Material Requisition To Resource Division RTOR000155/2021-2022 1238/BWD 07/03/2022 Resource Division 4.19 0.00 0 0
3000 PURBA BARDHAMAN Burdwan Division Augmentation of ground water based NABABHAT PWSS to accommodate FHTC in BURDWAN-I block under Burdwan Sub Division of Burdwan Division in Purba Bardhaman District , SM/09489 Augmentation Material Requisition To Resource Division RTOR000061/2021-2022 544/BWD 27/01/2022 Resource Division 25.82 0.00 0 0
3001 PURBA BARDHAMAN Burdwan Division Augmentation of ground water based NABABHAT PWSS to accommodate FHTC in BURDWAN-I block under Burdwan Sub Division of Burdwan Division in Purba Bardhaman District , SM/09489 Augmentation Material Requisition To Resource Division RTOR000214/2021-2022 1537/BWD 15/03/2022 Resource Division 0.37 0.00 0 0
3002 PURBA BARDHAMAN Burdwan Division Augmentation of ground water based NABABHAT PWSS to accommodate FHTC in BURDWAN-I block under Burdwan Sub Division of Burdwan Division in Purba Bardhaman District , SM/09489 Augmentation Augmentation of NABABHAT Piped Water Supply Scheme with LDS, FHTC, Rising Main, Construction of 450 Cum capacity OHR with 20.0 Mtr. Staging height inclusive of soil investigation & repairing of Pump House at Head works & 2nd TW site under Burdwan I Block, District - Purba Bardhaman. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. Junior Engineer, Burdwan Sadar Sub-Division ORD/000016/2022-2023 1964/BWD 12/04/2022 1080 S.P. CONSTRUCTION 514.15 432.40 84.1 100
3003 PURBA BARDHAMAN Burdwan Division Augmentation of Ground Water based Piped Water Supply Scheme for BHATAKUL (Zone-I & II) to accommodate FHTC under Jal Sapno Mission under Bhatar Block in Purba Bardhaman District under Burdwan Division, P.H.E. DTE. , SM/09715 Augmentation Supply of materials for different water supply schemes under Burdwan Division, PHE Dte. VCH/001555/2021-2022 1194/DW 10/03/2022 EXECUTIVE ENGINEER, RESOURCES DIVISION, P.H.E. DTE. 62.76 0.00 0 0
3004 PURBA BARDHAMAN Burdwan Division Augmentation of Ground Water based Piped Water Supply Scheme for BHATAKUL (Zone-I & II) to accommodate FHTC under Jal Sapno Mission under Bhatar Block in Purba Bardhaman District under Burdwan Division, P.H.E. DTE. , SM/09715 Augmentation Supply of materials for different water supply scheme under Burdwan Division, PHE Dte. VCH/001578/2021-2022 1207/DW 10/03/2022 EXECUTIVE ENGINEER, RESOURCES DIVISION, P.H.E. DTE. 3,005.00 0.00 0 0
3005 PURBA BARDHAMAN Burdwan Division Augmentation of Ground Water based Piped Water Supply Scheme for BHATAKUL (Zone-I & II) to accommodate FHTC under Jal Sapno Mission under Bhatar Block in Purba Bardhaman District under Burdwan Division, P.H.E. DTE. , SM/09715 Augmentation Route Survey & Preparation of DPR for BHATAKUL PWSS under Durgapur(Bardhaman North) Sub-Division under Burdwan Division PHE Dte.[SL-F] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000657/2021-2022 106/DSD 18/02/2022 15 SIRCON ENGINEERING SERVICES 2.63 2.63 100 1
3006 PURBA BARDHAMAN Burdwan Division Augmentation of Ground Water based Piped Water Supply Scheme for BHATAKUL (Zone-I & II) to accommodate FHTC under Jal Sapno Mission under Bhatar Block in Purba Bardhaman District under Burdwan Division, P.H.E. DTE. , SM/09715 Augmentation Shifting of 25 KVA S/STN with Selenda 11KV HTOH Line from the premises of Bhatakul PWSS under Burdwan Division, PHE Dte. VCH/000653/2022-2023 550/DW/22-23 13/09/2022 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LTD. 2.43 0.00 0 0
3007 PURBA BARDHAMAN Central Mechanical Augmentation of Ground Water based Piped Water Supply Scheme for BHATAKUL (Zone-I & II) to accommodate FHTC under Jal Sapno Mission under Bhatar Block in Purba Bardhaman District under Burdwan Division, P.H.E. DTE. , SM/09715 Augmentation Supply & Installation of Submersible Pumping Machinery , Voltage Stabilizer, Chlorination system and internal House wiring for Tube well no.- 1 at Augmentation of Bhatakul (Zone-I) Water Supply Scheme under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER ORD/000620/2022-2023 2093/CMD 08/09/2022 30 CHOUDHURY ENTERPRISE 10.82 10.73 99.17 1
3008 PURBA BARDHAMAN Central Mechanical Augmentation of Ground Water based Piped Water Supply Scheme for BHATAKUL (Zone-I & II) to accommodate FHTC under Jal Sapno Mission under Bhatar Block in Purba Bardhaman District under Burdwan Division, P.H.E. DTE. , SM/09715 Augmentation Restoration of power line for New Well No. 1 at Bhatakul (Zone - I) Water Supply Scheme, under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER ORD/000781/2022-2023 1370/CMSD - I 30/12/2022 15 CHOUDHURY ENTERPRISE 1.66 1.66 100 1
3009 PURBA BARDHAMAN Burdwan Division Augmentation of Ground Water based Piped Water Supply Scheme for BHATAKUL (Zone-I & II) to accommodate FHTC under Jal Sapno Mission under Bhatar Block in Purba Bardhaman District under Burdwan Division, P.H.E. DTE. , SM/09715 Augmentation Construction of Drum Sheet Walling and Approach road to HW site for Augmentation of Bhatakul (Zone-I ) Piped water supply Scheme , P.H.E Dte. Block:-Bhatar, Dist: Purba Bardhaman. SL-13 Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer2, Durgapur Sub-Division, PHE Dte. ORD/000534/2022-2023 653/DSD 03/11/2022 30 NANGTASWAR CO. OP. LABOUR CONT. AND CONSTRUCTION SOCIETY LTD. 2.99 2.99 100 100
3010 PURBA BARDHAMAN Burdwan Division Augmentation of Ground Water based Piped Water Supply Scheme for BHATAKUL (Zone-I & II) to accommodate FHTC under Jal Sapno Mission under Bhatar Block in Purba Bardhaman District under Burdwan Division, P.H.E. DTE. , SM/09715 Augmentation Material Requisition To Resource Division RTOR000030/2021-2022 548/BWD 27/01/2022 Resource Division 9.39 0.00 0 0
3011 PURBA BARDHAMAN Burdwan Division Augmentation of Ground Water based Piped Water Supply Scheme for BHATAKUL (Zone-I & II) to accommodate FHTC under Jal Sapno Mission under Bhatar Block in Purba Bardhaman District under Burdwan Division, P.H.E. DTE. , SM/09715 Augmentation Material Requisition To Resource Division RTOR000220/2021-2022 1543/BWD 15/03/2022 Resource Division 0.37 0.00 0 0
3012 PURBA BARDHAMAN Burdwan Division Augmentation of Ground Water based Piped Water Supply Scheme for BHATAKUL (Zone-I & II) to accommodate FHTC under Jal Sapno Mission under Bhatar Block in Purba Bardhaman District under Burdwan Division, P.H.E. DTE. , SM/09715 Augmentation Material Requisition To Resource Division RTOR000192/2021-2022 1374/BWD 09/03/2022 Resource Division 3.83 0.00 0 0
3013 PURBA BARDHAMAN Burdwan Division Augmentation of Ground Water based Piped Water Supply Scheme for BHATAKUL (Zone-I & II) to accommodate FHTC under Jal Sapno Mission under Bhatar Block in Purba Bardhaman District under Burdwan Division, P.H.E. DTE. , SM/09715 Augmentation Material Requisition To Resource Division RTOR000172/2021-2022 1338/BWD 08/03/2022 Resource Division 56.67 0.00 0 0
3014 PURBA BARDHAMAN Burdwan Division Augmentation of Ground Water based Piped Water Supply Scheme for BHATAKUL (Zone-I & II) to accommodate FHTC under Jal Sapno Mission under Bhatar Block in Purba Bardhaman District under Burdwan Division, P.H.E. DTE. , SM/09715 Augmentation Material Requisition To Resource Division RTOR000100/2021-2022 768/BWD 07/02/2022 Resource Division 38.41 0.00 0 0
3015 PURBA BARDHAMAN Burdwan Division Augmentation of Ground Water based Piped Water Supply Scheme for BHATAKUL (Zone-I & II) to accommodate FHTC under Jal Sapno Mission under Bhatar Block in Purba Bardhaman District under Burdwan Division, P.H.E. DTE. , SM/09715 Augmentation Material Requisition To Resource Division RTOR000020/2022-2023 3276/BWD 29/07/2022 Resource Division 69.15 0.00 0 0
3016 PURBA BARDHAMAN Burdwan Division Augmentation of Ground Water based Piped Water Supply Scheme for BHATAKUL (Zone-I & II) to accommodate FHTC under Jal Sapno Mission under Bhatar Block in Purba Bardhaman District under Burdwan Division, P.H.E. DTE. , SM/09715 Augmentation Sinking of 300 X 200mm dia Tube Well 200 mtr. Depth by D.R. Rig method using UPVC pipe (CD) and UPVC Deep Well Screen (RDS) at 1st & 2nd Tubewell site for Augmentation of BHATAKUL (Zone-I & II) Piped Water Supply Scheme, Block - Bhatar, Dist - Purba Bardhaman under Burdwan Division, PHE Dte. [2 Nos. GTW]. Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer2, Durgapur Sub-Division, PHE Dte. ORD/000014/2022-2023 1962/BWD 12/04/2022 45 ACME CONSTRUCTION 22.05 12.19 55.28 100
3017 PURBA BARDHAMAN Central Mechanical Augmentation of Ground Water based Piped Water Supply Scheme for BHATAKUL (Zone-I & II) to accommodate FHTC under Jal Sapno Mission under Bhatar Block in Purba Bardhaman District under Burdwan Division, P.H.E. DTE. , SM/09715 Augmentation Quotation for new service connection for Bhatakul PWSS Zone-2, PH-2. BILL/00309/2024-2025 null 19/06/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 11.79 0.00 0 0
3018 PURBA BARDHAMAN Burdwan Division Augmentation of Ground Water based Piped Water Supply Scheme for BHATAKUL (Zone-I & II) to accommodate FHTC under Jal Sapno Mission under Bhatar Block in Purba Bardhaman District under Burdwan Division, P.H.E. DTE. , SM/09715 Augmentation Quotation from WBSEDCL for Augmentation of Bhatakul Zone-2 water supply scheme for P.H.-2 under Burdwan Division, PHE Dte. BILL/00390/2024-2025 536/JJM 18/07/2024 WBSEDCL 11.79 0.00 0 0
3019 PURBA BARDHAMAN Burdwan Division Augmentation of Ground Water based Piped Water Supply Scheme for BHATAKUL (Zone-I & II) to accommodate FHTC under Jal Sapno Mission under Bhatar Block in Purba Bardhaman District under Burdwan Division, P.H.E. DTE. , SM/09715 Augmentation Augmentation of BHATAKUL Piped Water Supply Scheme (Zone - I & II) including Laying Distribution System, Functional Household Tap Connection, Pumping Main, 350 Cum capacity Over Head Reservoir with 20 Mtr. staging height (including Soil Testing), Switch Room with sanitary arrangement, construction of Boundary wall in Head work site and repairing of pump house at Bhatar Block in under Burdwan Division, PHE. Dte. Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer2, Durgapur Sub-Division, PHE Dte. ORD/000398/2021-2022 277/BWD 14/01/2022 657 SATYANARAYAN ENGINEERS CO. OP. SOCIETY LTD. 351.08 206.56 58.84 100
3020 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED SASINARA ZONE III PWSS TO ACCOMMODATE FHTC IN MEMARI-I BLOCK UNDER BURDWAN SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/10059 Augmentation Laying distribution and rising main pipeline including Providing Functional Household Tap Connection (FHTC) for augmentation of SASINARA ZONE III Piped Water Supply Scheme under MEMARI I Block, District: Purba Bardhaman under Burdwan Division, PHE. Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000001/2022-2023 1839/BWD 04/04/2022 30 THREE MAA ENTERPRISE 49.71 37.71 75.86 1
3021 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED SASINARA ZONE III PWSS TO ACCOMMODATE FHTC IN MEMARI-I BLOCK UNDER BURDWAN SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/10059 Augmentation Laying of 90mm dia pipeline for SASINARA ZONE-III Piped Water Supply Scheme from Pump house to Nishraghar dharmatala via Annapurnatala under MEMARI- I Block under Burdwan Sub-Division under Burdwan Division, PHE Dte. Group.A. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000099/2022-2023 965/BSD 14/06/2022 30 THREE MAA ENTERPRISE 4.78 4.78 100 1
3022 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED SASINARA ZONE III PWSS TO ACCOMMODATE FHTC IN MEMARI-I BLOCK UNDER BURDWAN SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/10059 Augmentation Route Survey & Preparation of DPR for Sasinara (Zone-II) & (Zone-III) W/S Scheme under Burdwan-II Block under Burdwan Sub-Division under Burdwan Division PHE Dte. Sl No.2. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000491/2021-2022 177/BSD 31/01/2022 30 RADIANT 3.76 0.00 0 1
3023 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED SASINARA ZONE III PWSS TO ACCOMMODATE FHTC IN MEMARI-I BLOCK UNDER BURDWAN SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/10059 Augmentation Providing Balance Functional Household Tap Connection (FHTC) from existing distribution system within the command area of SASINARA ZONE-III Piped Water Supply Scheme and under NISHRAGHAR Mouza under MEMARI-I Block of Burdwan Sub-Division under Burdwan Division, PHE. Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000764/2022-2023 510/BSD 21/03/2023 45 A R TRADERS 3.51 3.49 99.43 100
3024 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED SASINARA ZONE III PWSS TO ACCOMMODATE FHTC IN MEMARI-I BLOCK UNDER BURDWAN SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/10059 Augmentation Material Requisition To Resource Division RTOR000151/2021-2022 1245/BWD 07/03/2022 Resource Division 3.92 0.00 0 0
3025 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED SASINARA ZONE III PWSS TO ACCOMMODATE FHTC IN MEMARI-I BLOCK UNDER BURDWAN SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/10059 Augmentation Material Requisition To Resource Division RTOR000180/2021-2022 1337/BWD 08/03/2022 Resource Division 2.81 0.00 0 0
3026 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED SASINARA ZONE III PWSS TO ACCOMMODATE FHTC IN MEMARI-I BLOCK UNDER BURDWAN SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/10059 Augmentation Material Requisition To Resource Division RTOR000225/2021-2022 1548/BWD 15/03/2022 Resource Division 1.32 0.00 0 0
3027 PURBA BARDHAMAN Burdwan Division AGUMENTATION OF GROUND WATER BASED SATGACHIA ZONE I PWSS TO ACCOMMODATE FHTC IN MEMARI-II BLOCK UNDER BURDWAN SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/10061 Augmentation Route Survey & Preparation of DPR for Satgachia (Zone-I) & (Zone-II) W/S Scheme under Memari-II Block under Burdwan Sub-Division under Burdwan Division PHE Dte. Sl No.4. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000492/2021-2022 179/BSD 31/01/2022 30 RADIANT 4.21 2.10 49.88 1
3028 PURBA BARDHAMAN Burdwan Division AGUMENTATION OF GROUND WATER BASED SATGACHIA ZONE I PWSS TO ACCOMMODATE FHTC IN MEMARI-II BLOCK UNDER BURDWAN SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/10061 Augmentation Restoration work of Debipur-Bulbulitala Road from 15.00 km to 17.10 km (in stretches) damage due to laying of underground water pipeline by PHE with box cutting and jhama with moorum consolidation under Kalna Highway Sub-Division of Burdwan South Highway Division, P.W. Roads Dte. during the Year 2023-2024. BILL/01173/2023-2024 1079/JJM 20/12/2023 EXECUTIVE ENGINEER BURDWAN SOUTH HIGHWAY DIVISION P.W. (ROADS) DTE. 5.51 0.00 0 0
3029 PURBA BARDHAMAN Burdwan Division AGUMENTATION OF GROUND WATER BASED SATGACHIA ZONE I PWSS TO ACCOMMODATE FHTC IN MEMARI-II BLOCK UNDER BURDWAN SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/10061 Augmentation Replacement of Tube-well & Rising main at HEAD TW site for Aug. of PARHATI, SRIDHARPUR, SATGACHIA ZONE-I, SATGACHIA ZONE-II, Piped Water Supply Scheme within MEMARI-II Block under Burdwan Divn., PHE. Dte. District:- Purba-Bardhaman. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000973/2023-2024 24/BWD 03/01/2024 60 SUSUNIA GP CO. OPERATIVE LABOUR CONTRACT AND CONSTRUCTION SOCIETY LTD. 54.20 0.00 0 90
3030 PURBA BARDHAMAN Burdwan Division AGUMENTATION OF GROUND WATER BASED SATGACHIA ZONE I PWSS TO ACCOMMODATE FHTC IN MEMARI-II BLOCK UNDER BURDWAN SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/10061 Augmentation Augmentation of SATGACHIA (Zone-I) Piped Water Supply Scheme with LDS, FHTC, Rising main, Construction of 500 cum capacity OHR with 20.0 mtr. Staging height inclusive of soil investigation under MEMARI- II Block, District:- Purba-Burdwan. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000156/2022-2023 3123/BWD 18/07/2022 365 M/S ASHA CONSTRUCTION 544.27 208.57 38.32 80
3031 PURBA BARDHAMAN Burdwan Division AGUMENTATION OF GROUND WATER BASED SATGACHIA ZONE I PWSS TO ACCOMMODATE FHTC IN MEMARI-II BLOCK UNDER BURDWAN SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/10061 Augmentation Construction of switch rooms & Rising main at different TW site for SATGACHIA (Zone-I) Piped Water Supply Scheme under Memari - II Block, District:- Purba-Bardhaman under Burdwan Division, PHE. Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000535/2023-2024 3632/BWD 21/08/2023 60 ROY ASSOCIATE 9.08 0.00 0 100
3032 PURBA BARDHAMAN Burdwan Division AGUMENTATION OF GROUND WATER BASED SATGACHIA ZONE I PWSS TO ACCOMMODATE FHTC IN MEMARI-II BLOCK UNDER BURDWAN SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/10061 Augmentation Repairing damaged Pipeline & concrete road by Cement concrete (mix 1:1.5:3) and drainage system, Sluice valve chamber for FHTC work for SATGACHIA ZONE-I, SATGACHIA ZONE-II, SRIDHARPUR, PARHATI, KUCHUT, NOAHATI, MONDALGRAM PWSS and its adjoining mouzas within MEMARI-II BLOCK under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000283/2024-2025 2715/BWD 11/07/2024 205 A.R. TRADERS 74.28 0.00 0 30
3033 PURBA BARDHAMAN Burdwan Division AGUMENTATION OF GROUND WATER BASED SATGACHIA ZONE I PWSS TO ACCOMMODATE FHTC IN MEMARI-II BLOCK UNDER BURDWAN SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/10061 Augmentation Different Types of work involved in connection with different Augmentation & Retrofitting Schemes (06 Nos.) Piped Water Supply Scheme under Memari II Block within Burdwan Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/001269/2024-2025 848/BWD 05/03/2025 120 PROJECT INDIA 394.29 0.00 0 0
3034 PURBA BARDHAMAN Burdwan Division DETAILED PROJECT REPORT FOR AUGMENTATION F GROUND WATER BASED DHATRIGRAM PWSS TO ACCOMMODATE FHTC IN KALNA I BLOCK UNDER KALNA SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/10270 Augmentation Supply of materials for different water supply scheme under Burdwan Division, PHE Dte. VCH/001578/2021-2022 1207/DW 10/03/2022 EXECUTIVE ENGINEER, RESOURCES DIVISION, P.H.E. DTE. 3,005.00 0.00 0 0
3035 PURBA BARDHAMAN Burdwan Division DETAILED PROJECT REPORT FOR AUGMENTATION F GROUND WATER BASED DHATRIGRAM PWSS TO ACCOMMODATE FHTC IN KALNA I BLOCK UNDER KALNA SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/10270 Augmentation Preparation of DPR for augmentation of Dhatrigram W/S Scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. (Sl No-C) Assistant Engineer ORD/000515/2021-2022 183/KSD 21/02/2022 21 LEMNISCATE 3.17 3.17 100 1
3036 PURBA BARDHAMAN Central Mechanical DETAILED PROJECT REPORT FOR AUGMENTATION F GROUND WATER BASED DHATRIGRAM PWSS TO ACCOMMODATE FHTC IN KALNA I BLOCK UNDER KALNA SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/10270 Augmentation Installation of a Voltage correcting device along with allied accessories at DHATRIGRAM Water Supply Scheme, Pump house-2 under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000122/2023-2024 497/CMSD-I 13/06/2023 21 SUDIKSHA CONSTRUCTION 3.48 3.48 100 0
3037 PURBA BARDHAMAN Central Mechanical DETAILED PROJECT REPORT FOR AUGMENTATION F GROUND WATER BASED DHATRIGRAM PWSS TO ACCOMMODATE FHTC IN KALNA I BLOCK UNDER KALNA SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/10270 Augmentation Supply and Installation of Submersible Pumping Machinery for breakdown maintenance along with allied accessories for Tube Well no- 3A & Lowering of pumping machinery at T.W-3B at DHATRIGRAM and some other works at jot raghab & Deriapur Water Supply Scheme, under CMD, PHE Dte., Dist.- Purba-Bardhaman. ORD/000109/2023-2024 387/CMSD-I 19/04/2023 21 CHOUDHURY ENTERPRISE 0.69 0.69 100 0
3038 PURBA BARDHAMAN Burdwan Division DETAILED PROJECT REPORT FOR AUGMENTATION F GROUND WATER BASED DHATRIGRAM PWSS TO ACCOMMODATE FHTC IN KALNA I BLOCK UNDER KALNA SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/10270 Augmentation Restoration of existing concrete road and HDD Boring for laying distribution system of augmentation of Dhatrigram Water Supply Scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000079/2023-2024 2055/BWD 04/05/2023 60 PUSPA ENTERPRISE 38.67 38.67 100 100
3039 PURBA BARDHAMAN Burdwan Division DETAILED PROJECT REPORT FOR AUGMENTATION F GROUND WATER BASED DHATRIGRAM PWSS TO ACCOMMODATE FHTC IN KALNA I BLOCK UNDER KALNA SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/10270 Augmentation Sinking of 250 X 150mm dia Tube Well 150 mtr. Depth by D.R. Rig method using UPVC pipe (CD) and UPVC Deep Well Screen (RDS) for Aug. of DHATRIGRAM Piped Water Supply Scheme, Block - Kalna - I, Dist - Purba Bardhaman under Burdwan Division, PHE Dte. [For 02 Nos. Tube well]. ORD/000219/2023-2024 2710/BWD 08/06/2023 45 AUXILIARY TUBE WELL DRILLERS 19.76 18.22 92.21 100
3040 PURBA BARDHAMAN Central Mechanical DETAILED PROJECT REPORT FOR AUGMENTATION F GROUND WATER BASED DHATRIGRAM PWSS TO ACCOMMODATE FHTC IN KALNA I BLOCK UNDER KALNA SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/10270 Augmentation New service connection charges for Dhatrigram PWSS TW 4 BILL/01485/2023-2024 BP-2023-24-181 04/10/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 5.35 0.00 0 0
3041 PURBA BARDHAMAN Central Mechanical DETAILED PROJECT REPORT FOR AUGMENTATION F GROUND WATER BASED DHATRIGRAM PWSS TO ACCOMMODATE FHTC IN KALNA I BLOCK UNDER KALNA SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/10270 Augmentation New service connection charges for Dhatrigram PWSS TW-7 BILL/01487/2023-2024 BP-2023-24-182 04/10/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 6.36 0.00 0 0
3042 PURBA BARDHAMAN Burdwan Division DETAILED PROJECT REPORT FOR AUGMENTATION F GROUND WATER BASED DHATRIGRAM PWSS TO ACCOMMODATE FHTC IN KALNA I BLOCK UNDER KALNA SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/10270 Augmentation Material Requisition To Resource Division RTOR000178/2021-2022 1336/BWD 08/03/2022 Resource Division 70.03 0.00 0 0
3043 PURBA BARDHAMAN Burdwan Division DETAILED PROJECT REPORT FOR AUGMENTATION F GROUND WATER BASED DHATRIGRAM PWSS TO ACCOMMODATE FHTC IN KALNA I BLOCK UNDER KALNA SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/10270 Augmentation Material Requisition To Resource Division RTOR000230/2021-2022 1552/BWD 15/03/2022 Resource Division 0.37 0.00 0 0
3044 PURBA BARDHAMAN Burdwan Division DETAILED PROJECT REPORT FOR AUGMENTATION F GROUND WATER BASED DHATRIGRAM PWSS TO ACCOMMODATE FHTC IN KALNA I BLOCK UNDER KALNA SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/10270 Augmentation Material Requisition To Resource Division RTOR000187/2021-2022 1382/BWD 09/03/2022 Resource Division 3.88 0.00 0 0
3045 PURBA BARDHAMAN Burdwan Division DETAILED PROJECT REPORT FOR AUGMENTATION F GROUND WATER BASED DHATRIGRAM PWSS TO ACCOMMODATE FHTC IN KALNA I BLOCK UNDER KALNA SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/10270 Augmentation Material Requisition To Resource Division RTOR000047/2022-2023 4850/BWD 20/10/2022 Resource Division 15.40 0.00 0 0
3046 PURBA BARDHAMAN Burdwan Division DETAILED PROJECT REPORT FOR AUGMENTATION F GROUND WATER BASED DHATRIGRAM PWSS TO ACCOMMODATE FHTC IN KALNA I BLOCK UNDER KALNA SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/10270 Augmentation Shifting of pipe line of DHATRIGRAM Piped Water Supply Scheme for widening of road from Nabadwip more to Dhatrigram rail gate along the Dhatrigram-Burdwan road within Kalna Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000685/2023-2024 4281/BWD 29/09/2023 60 IYASIN DAFADAR 11.99 0.00 0 100
3047 PURBA BARDHAMAN Central Mechanical DETAILED PROJECT REPORT FOR AUGMENTATION F GROUND WATER BASED DHATRIGRAM PWSS TO ACCOMMODATE FHTC IN KALNA I BLOCK UNDER KALNA SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/10270 Augmentation Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.- 4 & 5 at Augumentation of DHATRIGRAM Water Supply Scheme [BLOCK- KALNA-2] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/001612/2023-2024 1543/CMD 05/03/2024 60 M/S. SWAPAN BANERJEE 24.62 0.00 0 90
3048 PURBA BARDHAMAN Central Mechanical DETAILED PROJECT REPORT FOR AUGMENTATION F GROUND WATER BASED DHATRIGRAM PWSS TO ACCOMMODATE FHTC IN KALNA I BLOCK UNDER KALNA SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/10270 Augmentation Additional Quotation for new service connection for Dhatrigram Daspara PWSS . BILL/00310/2024-2025 BP-2024-25-151 21/06/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 0.45 0.00 0 0
3049 PURBA BARDHAMAN Burdwan Division DETAILED PROJECT REPORT FOR AUGMENTATION F GROUND WATER BASED DHATRIGRAM PWSS TO ACCOMMODATE FHTC IN KALNA I BLOCK UNDER KALNA SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/10270 Augmentation Additional pipe laying and other allied works of distribution system for construction of New OHR Site within the command area of Aug. of DHATRIGRAM Piped Water Supply Scheme of KALNA Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000967/2023-2024 004/BWD 02/01/2024 60 PUSPA ENTERPRISE 55.13 0.00 0 33
3050 PURBA BARDHAMAN Central Mechanical DETAILED PROJECT REPORT FOR AUGMENTATION F GROUND WATER BASED DHATRIGRAM PWSS TO ACCOMMODATE FHTC IN KALNA I BLOCK UNDER KALNA SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/10270 Augmentation Supply and installation of Electro-Magnetic flow meter at Bazar Mahammadpur, Dhatrigram, Arjunpukur & others water supply scheme under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000590/2024-2025 3105/CMD 11/12/2024 60 SHREE BISHNU CONSTRUCTION 19.77 0.00 0 0
3051 PURBA BARDHAMAN Burdwan Division DETAILED PROJECT REPORT FOR AUGMENTATION F GROUND WATER BASED DHATRIGRAM PWSS TO ACCOMMODATE FHTC IN KALNA I BLOCK UNDER KALNA SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/10270 Augmentation Augmentation of Dhatrigram Piped Water Supply Scheme with LDS, FHTC, Rising main, Construction of new 500 cum capacity OHR with 20.0 mtr. Staging height with soil investigation including construction of 5(five) nos. switch-room(5.40mx3.6m), construction of five nos. new boundary wall for new TW sites & repairing of existing OHR, switch room & boundary wall under Kalna-I Block, District:- Purba-Burdwan. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000145/2022-2023 3046/BWD 08/07/2022 365 PUSPA ENTERPRISE 697.50 524.85 75.25 70
3052 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Hiranyagram Piped Water Supply Scheme at Jamalpur Block , SM/07818 Retrofitting Hire & fuel charges of vehicle (Car No.-WB-41H-9788) for the office of the Assistant Head Quarters, Burdwan Division, PHE Dte. for the month of June & July'22. VCH/000493/2022-2023 460/VEH/22-23 29/08/2022 SK. ASRAFUDDIN 0.76 0.00 0 0
3053 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Hiranyagram Piped Water Supply Scheme at Jamalpur Block , SM/07818 Retrofitting Providing Functional Household Tap Connection (FHTC) at Hiranyagram village within the command area of Hiranyagram Piped Water Supply Scheme at Jamalpur Block under Burdwan Division, PHE Dte. [Group : B] AE(HQs) ORD/000459/2021-2022 67/AE/HQ 11/02/2022 30 APORUPA CONSTRUCTION 4.83 4.62 95.65 1
3054 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Hiranyagram Piped Water Supply Scheme at Jamalpur Block , SM/07818 Retrofitting Material Requisition To Resource Division RTOR000054/2022-2023 5525/BWD 23/12/2022 Resource Division 0.62 0.00 0 0
3055 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Hiranyagram Piped Water Supply Scheme at Jamalpur Block , SM/07818 Retrofitting Laying of 75mm and 50mm dia. uPVC pipe for providing FHTC at different habitation of Paratal and Ruda Mouza within Hiranyagram Piped Water Supply Scheme, Jamalpur Block under Burdwan Division P.H.E DTE. [Group: ¿B¿] AE(HQs) ORD/000223/2021-2022 1818/AE/HQ 21/09/2021 30 APORUPA CONSTRUCTION 4.74 4.44 93.67 1
3056 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Hiranyagram Piped Water Supply Scheme at Jamalpur Block , SM/07818 Retrofitting Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of Hiranyagram Piped Water Supply Scheme at Ruda Village (2 Nos. habitations), Hiranyagram Village (2 Nos. habitations), Sajipur Village, Basantapur Village (2 Nos. habitations), Parutal Village (2 Nos. habitations), Betragarh Village, Jamalpur Block under Burdwan Division, PHE Dte.[Agreement No. 711/BWD OF 2020-2021.] AE(HQs) ORD/000336/2020-2021 1597/BWD 22/02/2021 60 MANASH GHOSH 93.36 92.70 99.29 1
3057 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Hiranyagram Piped Water Supply Scheme at Jamalpur Block , SM/07818 Retrofitting Continuation order for supply & delivery of different dia CIDF pipes, sluice valve & fittings for construction of RCC OHR (450 cum capacity) for Hiranyagram w/s scheme under Burdwan Division, PHE Dte. AE(HQs) ORD/000692/2021-2022 388/BWD 20/01/2022 20 ASHOKE ENGINEERING WORKS 15.17 0.00 0 1
3058 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Hiranyagram Piped Water Supply Scheme at Jamalpur Block , SM/07818 Retrofitting Providing Functional Household Tap Connection (FHTC) at Paratal village within the command area of HIRANYAGRAM Piped Water Supply Scheme at Jamalpur Block under Burdwan Division, PHE Dte. [Group : C] AE(HQs) ORD/000047/2022-2023 201/AE/HQ 06/04/2022 30 M/S SAYAN CHAKRABORTY 4.85 4.84 99.79 1
3059 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Hiranyagram Piped Water Supply Scheme at Jamalpur Block , SM/07818 Retrofitting Providing Functional Household Tap Connection (FHTC) at Basantaput and Paratal village within the command area of HIRANYAGRAM Piped Water Supply Scheme at Jamalpur Block under Burdwan Division, PHE Dte. [Group : B] AE(HQs) ORD/000041/2022-2023 228/AE/HQ 19/04/2022 30 M/S UNIQUE 4.77 4.66 97.69 1
3060 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Hiranyagram Piped Water Supply Scheme at Jamalpur Block , SM/07818 Retrofitting Construction of boundary wall (North-East Side) at Headworks site of HIRANYAGRAM W/S Scheme under Jamalpur Block of Burdwan Division, PHE Dte. (Length-63Mtr., Column-26Nos.) [Group : E] AE(HQs) ORD/000044/2022-2023 237/AE/HQ 19/04/2022 30 APORUPA CONSTRUCTION 4.83 0.00 0 1
3061 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Hiranyagram Piped Water Supply Scheme at Jamalpur Block , SM/07818 Retrofitting Construction of balance portion of boundary wall at H/W SITE of HIRANYAGRAM Piped W/S. Scheme under Burdwan Division PHE Dte. [Group : C] AE(HQs) ORD/000360/2022-2023 447/AE/HQ 16/08/2022 30 APORUPA CONSTRUCTION 2.98 0.00 0 1
3062 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Hiranyagram Piped Water Supply Scheme at Jamalpur Block , SM/07818 Retrofitting Providing Functional Household Tap Connection (FHTC) at Basantapur and Ruda village within the command area of HIRANYAGRAM Piped Water Supply Scheme at Jamalpur Block under Burdwan Division, PHE Dte. [Group : B] AE(HQs) ORD/000046/2022-2023 200/AE/HQ 06/04/2022 30 DEY NIRMAN 4.85 4.35 89.69 1
3063 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Hiranyagram Piped Water Supply Scheme at Jamalpur Block , SM/07818 Retrofitting Construction of valve chamber and necessary repairing work of pipeline for smooth running of HIRANYAGRAM Piped Water Supply Scheme, Jamalpur Dev. Block under Burdwan Division, P.H.E Dte. AE(HQs) J.E. 2 BURDWAN ORD/000402/2023-2024 387/AE/HQ 26/07/2023 30 SANDIPAN SENGUPTA 0.74 0.74 100 100
3064 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Hiranyagram Piped Water Supply Scheme at Jamalpur Block , SM/07818 Retrofitting Laying of uPVC pipe for providing FHTC at Ruda, Sajipur, Paratal, Betragar Village within Hiranyagram Piped Water Supply Scheme, Jamalpur Block under Burdwan Division P.H.E Dte._Gr-D Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000629/2021-2022 126/AE/HQ 04/03/2022 15 APORUPA CONSTRUCTION 4.64 3.00 64.66 100
3065 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) retrofitting in the command area of of Nabagram Piped Water Supply Scheme at Jamalpur Block , SM/08101 Retrofitting Construction of boundary wall (Back side of OHR) including land development & Pumping out of water at Pump house no - 1 Site of Nabagram Water Supply Scheme under Jamalpur Dev. Block of Burdwan Division, PHE Dte. (Length -50.00 Mtr, Col-20 Nos). Gr.G. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000659/2021-2022 472/BSD 21/03/2022 45 MOHAMMAD ISSA 3.77 0.00 0 1
3066 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) retrofitting in the command area of of Nabagram Piped Water Supply Scheme at Jamalpur Block , SM/08101 Retrofitting Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of Nabagram Piped Water Supply Scheme at Ajhapur (Part) (Masagram Habitation), Village (Mouza), Jamalpur Block under Burdwan Division, PHE Dte. (Agreement No. 115/2020-2021 OF SE/CC/PHE. DTE.) Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000440/2020-2021 1402/BWD 15/02/2021 60 M/S ASHA CONSTRUCTION 67.11 57.25 85.31 1
3067 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) retrofitting in the command area of of Nabagram Piped Water Supply Scheme at Jamalpur Block , SM/08101 Retrofitting Formal Work Order for Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of Nabagram Piped Water Supply Scheme at Ajhapur (Part) (Ajhapur Habitation), Village (Mouza), Jamalpur Block under Burdwan Division, PHE Dte. (Agreement no. 116/SE/CC/PHE/Dte of 2020-2021) Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. Junior Engineer, R.W.S. Burdwan Sub Division, P.H.E. Dt ORD/000470/2020-2021 1515/BWD 19/02/2021 60 S.S. CONSTRUCTION 75.65 75.24 99.46 0
3068 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) retrofitting in the command area of of Nabagram Piped Water Supply Scheme at Jamalpur Block , SM/08101 Retrofitting Providing FHTC for 100% coverage at Nabagram, Basishta Pur, Keliri, Ajhapur & Dattapur Mouza (Village) for NABAGRAM Piped W/S Scheme, Jamalpur Dev. Block under Burdwan Division, PHE Dte. AE(HQs) RWS_JAMALPUR ORD/000570/2023-2024 3716/BWD 24/08/2023 30 M/S UNIQUE 23.77 6.19 26.04 50
3069 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) retrofitting in the command area of of Nabagram Piped Water Supply Scheme at Jamalpur Block , SM/08101 Retrofitting Sinking of 300 mm X 200 mm dia Tube Well 150 mtr. Depth by D.R. Rig method using UPVC pipe (CM) and UPVC Medium Well Screen (RMS) with construction of Pump House, Boundary wall, Land Development and Rising main connection of NABAGRAM Piped Water Supply Scheme, Block- Jamalpur, District:- Purba-Bardhaman under Burdwan Division PHE Dte. [FOR 3rd. TUBE WELL SITE]. AE(HQs) Junior Engineer, Burdwan Division ORD/001041/2023-2024 784/BWD 27/02/2024 60 ANIRUDDHA FARUQUE 29.04 0.00 0 35
3070 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) retrofitting in the command area of of Nabagram Piped Water Supply Scheme at Jamalpur Block , SM/08101 Retrofitting Laying of pipeline for providing FHTC 100% coverage and also construction & installation of Sluice Valve & Valve Chamber to control the flow of water, road restoration work etc. of different Piped W/S Schemes, Block Jamalpur under Burdwan Division, PHE Dte. AE(HQs) Junior Engineer, Burdwan Division ORD/000194/2024-2025 2488/BWD 01/07/2024 120 M/S NATIONAL CONSTRUCTION 480.97 0.00 0 0
3071 PURBA BARDHAMAN Burdwan Division Augmentation of ground water based KHANDOGHOSH PWSS to accommodate FHTC in Khandoghosh block under Burdwan Sub Division of Burdwan Division in Purba Bardhaman District , SM/09404 Augmentation Supply of materials for different water supply scheme under Burdwan Division, PHE Dte. VCH/001578/2021-2022 1207/DW 10/03/2022 EXECUTIVE ENGINEER, RESOURCES DIVISION, P.H.E. DTE. 3,005.00 0.00 0 0
3072 PURBA BARDHAMAN Burdwan Division Augmentation of ground water based KHANDOGHOSH PWSS to accommodate FHTC in Khandoghosh block under Burdwan Sub Division of Burdwan Division in Purba Bardhaman District , SM/09404 Augmentation Route Survey & Preparation of DPR for Khandaghosh W/S Scheme under Khandaghosh Block under Burdwan Sub-Division under Burdwan Division PHE Dte. Sl No.15. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000504/2021-2022 190/BSD 31/01/2022 30 RADIANT 3.01 3.01 100 1
3073 PURBA BARDHAMAN Burdwan Division Augmentation of ground water based KHANDOGHOSH PWSS to accommodate FHTC in Khandoghosh block under Burdwan Sub Division of Burdwan Division in Purba Bardhaman District , SM/09404 Augmentation Dismantling of concrete road for Augmentation of KHANDAGHOSH Pipe water supply scheme (Mouza: Khandaghosh, Lodna, Barisiali, Kapshit, Nabagram, Metedanga) at Khandaghosh Block of Burdwan Sub-Division under Burdwan Division, PHE Dte. Gr.B. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000440/2022-2023 1466/BSD 25/08/2022 45 JMD ENGINEERING INFRASTRUCTURE COMPANY 4.84 4.69 96.9 1
3074 PURBA BARDHAMAN Burdwan Division Augmentation of ground water based KHANDOGHOSH PWSS to accommodate FHTC in Khandoghosh block under Burdwan Sub Division of Burdwan Division in Purba Bardhaman District , SM/09404 Augmentation Supply and delivery of different dia. CIDF sluice valve for Augmentation of KHANDAGHOSH Piped Water Supply Scheme under Burdwan Division, P.H.E. Dte._SL. No. 07 Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000618/2021-2022 141/AE/HQ 16/03/2022 10 MAKALI ENGINEERING CORPORATION 4.52 0.00 0 0
3075 PURBA BARDHAMAN Burdwan Division Augmentation of ground water based KHANDOGHOSH PWSS to accommodate FHTC in Khandoghosh block under Burdwan Sub Division of Burdwan Division in Purba Bardhaman District , SM/09404 Augmentation Material Requisition To Resource Division RTOR000047/2021-2022 565/BWD 27/01/2022 Resource Division 25.72 0.00 0 0
3076 PURBA BARDHAMAN Burdwan Division Augmentation of ground water based KHANDOGHOSH PWSS to accommodate FHTC in Khandoghosh block under Burdwan Sub Division of Burdwan Division in Purba Bardhaman District , SM/09404 Augmentation Material Requisition To Resource Division RTOR000205/2021-2022 1528/BWD 15/03/2022 Resource Division 0.37 0.00 0 0
3077 PURBA BARDHAMAN Burdwan Division Augmentation of ground water based KHANDOGHOSH PWSS to accommodate FHTC in Khandoghosh block under Burdwan Sub Division of Burdwan Division in Purba Bardhaman District , SM/09404 Augmentation Material Requisition To Resource Division RTOR000096/2021-2022 951/BWD 17/02/2022 Resource Division 59.29 0.00 0 0
3078 PURBA BARDHAMAN Burdwan Division Augmentation of ground water based KHANDOGHOSH PWSS to accommodate FHTC in Khandoghosh block under Burdwan Sub Division of Burdwan Division in Purba Bardhaman District , SM/09404 Augmentation Material Requisition To Resource Division RTOR000015/2022-2023 3278/BWD 29/07/2022 Resource Division 34.57 0.00 0 0
3079 PURBA BARDHAMAN Burdwan Division Augmentation of ground water based KHANDOGHOSH PWSS to accommodate FHTC in Khandoghosh block under Burdwan Sub Division of Burdwan Division in Purba Bardhaman District , SM/09404 Augmentation Augmentation of KHANDAGHOSH Piped Water Supply Scheme with LDS, FHTC, Rising Main, Construction of 600 Cum capacity OHR with 20.0 Mtr. Staging height inclusive of soil investigation & construction of boundary wall at Head works, 2nd TW & 3rd TW site under Khandaghosh Block, District - Purba Bardhaman. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000017/2022-2023 1967/BWD 12/04/2022 360 M/S JAN MAHAMMAD 666.04 544.56 81.76 100
3080 PURBA BARDHAMAN Burdwan Division Augmentation of ground water based KHANDOGHOSH PWSS to accommodate FHTC in Khandoghosh block under Burdwan Sub Division of Burdwan Division in Purba Bardhaman District , SM/09404 Augmentation Construction of Boundary wall at Head Works Site of Aug. of KHANDAGHOSH Water Supply Scheme under KHANDAGHOSH Block of Burdwan Division, PHE Dte. (Length -210.00 Mtr, Col-80 Nos). Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000534/2023-2024 3631/BWD 21/08/2023 60 ROY ASSOCIATE 28.73 13.43 46.75 100
3081 PURBA BARDHAMAN Burdwan Division Augmentation of ground water based KHANDOGHOSH PWSS to accommodate FHTC in Khandoghosh block under Burdwan Sub Division of Burdwan Division in Purba Bardhaman District , SM/09404 Augmentation Providing Balance Functional Household Tap Connection (372 nos FHTC) from existing distribution system within the command area of KHANDAGHOSH Piped Water Supply Scheme at (Khandaghosh, Lodna, Metedanga, Nabagram, Kapsit, Barsiali) Mouza under KHANDAGHOSH Block of Burdwan Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000195/2023-2024 2689/BWD 08/06/2023 30 KAUSHIK RAY 16.73 0.00 0 100
3082 PURBA BARDHAMAN Burdwan Division Augmentation of ground water based KHANDOGHOSH PWSS to accommodate FHTC in Khandoghosh block under Burdwan Sub Division of Burdwan Division in Purba Bardhaman District , SM/09404 Augmentation Restoration work of hard shoulder at Badulia Khandaghosh Road from 12.00 to 13.00 km (L/S) due to laying of water supply pipeline by PHE Dte. under Sadarghat Highway Sub-Division No.-I of Burdwan South Highway Division, P.W. Roads Dte. in the district of Purba Bardhaman. BILL/00362/2024-2025 565/JJM 23/07/2024 EXECUTIVE ENGINEER BURDWAN SOUTH HIGHWAY DIVISION P.W. (ROADS) DTE. 8.12 0.00 0 0
3083 PURBA BARDHAMAN Khandaghosh Burdwan Division UKHRID PIPED WATER SUPPLY SCHEME , SM/13505 New Material Requisition To Resource Division RTOR000082/2023-2024 1962/BWD 25/04/2023 Resource Division 31.25 0.00 0 0
3084 PURBA BARDHAMAN Khandaghosh Burdwan Division UKHRID PIPED WATER SUPPLY SCHEME , SM/13505 New Material Requisition To Resource Division RTOR000165/2023-2024 2155/BWD 10/05/2023 Resource Division 12.60 0.00 0 0
3085 PURBA BARDHAMAN Khandaghosh Burdwan Division UKHRID PIPED WATER SUPPLY SCHEME , SM/13505 New Material Requisition To Resource Division RTOR000736/2023-2024 5234/BWD 30/11/2023 Resource Division 21.07 0.00 0 0
3086 PURBA BARDHAMAN Khandaghosh Central Mechanical UKHRID PIPED WATER SUPPLY SCHEME , SM/13505 New Quotation for new service connection at Ukhrid W/S Scheme PH-II. BILL/01810/2023-2024 BP-2023-24-304 30/12/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 4.29 0.00 0 0
3087 PURBA BARDHAMAN Khandaghosh Central Mechanical UKHRID PIPED WATER SUPPLY SCHEME , SM/13505 New Quotation for new service connection at UKHRID W/S Scheme PH-I. BILL/01816/2023-2024 BP-2023-24-303 30/12/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 4.54 0.00 0 0
3088 PURBA BARDHAMAN Khandaghosh Central Mechanical UKHRID PIPED WATER SUPPLY SCHEME , SM/13505 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at BICHKHARA & others water supply scheme under Khandoghosh Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman ASSISTANT ENGINEER Junior Engineer ORD/000064/2024-2025 2390/CMD 02/08/2024 90 MS DAS ELECTRIC CO 46.54 0.00 0 0
3089 PURBA BARDHAMAN Khandaghosh Central Mechanical UKHRID PIPED WATER SUPPLY SCHEME , SM/13505 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at Ukhrid Water Supply Scheme [ Block- Khandogosh ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER Junior Engineer ORD/000708/2023-2024 4019/CMD 29/08/2023 30 C.M. ENTERPRISE 28.88 0.00 0 100
3090 PURBA BARDHAMAN Khandaghosh Burdwan Division UKHRID PIPED WATER SUPPLY SCHEME , SM/13505 New Different works related (sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of different capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site) to AMRA, BALABATI, UKHRID & RUPSA Piped Water Supply Scheme under KHANDAGHOSH Block, District:- Purba Bardhaman [NEW SCHEME] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer1, Durgapur Sub-Division, PHE Dte.,Junior Engineer2, Durgapur Sub-Division, PHE Dte. ORD/000008/2023-2024 1726/BWD 13/04/2023 902 S.P. CONSTRUCTION 1,710.27 0.00 0 45
3091 PURBA BARDHAMAN Memari - I Burdwan Division CHOTKHANDA PIPED WATER SUPPLY SCHEME , SM/13907 New Material Requisition To Resource Division RTOR000236/2023-2024 2197/BWD 12/05/2023 Resource Division 7.93 0.00 0 0
3092 PURBA BARDHAMAN Memari - I Burdwan Division CHOTKHANDA PIPED WATER SUPPLY SCHEME , SM/13907 New Material Requisition To Resource Division RTOR000467/2023-2024 3991/BWD 08/09/2023 Resource Division 9.08 0.00 0 0
3093 PURBA BARDHAMAN Memari - I Burdwan Division CHOTKHANDA PIPED WATER SUPPLY SCHEME , SM/13907 New Material Requisition To Resource Division RTOR000663/2023-2024 5085/BWD 23/11/2023 Resource Division 20.46 0.00 0 0
3094 PURBA BARDHAMAN Memari - I Central Mechanical CHOTKHANDA PIPED WATER SUPPLY SCHEME , SM/13907 New Quotation for new electric service connection at Chotkhanda TW NO.-2 BILL/01740/2023-2024 BP-2023-24-243 07/12/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 7.61 0.00 0 0
3095 PURBA BARDHAMAN Memari - I Central Mechanical CHOTKHANDA PIPED WATER SUPPLY SCHEME , SM/13907 New New service connection charges for Chotkhanda PWSS TW-1 BILL/01728/2023-2024 BP-2023-24-244 07/12/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 6.02 0.00 0 0
3096 PURBA BARDHAMAN Memari - I Central Mechanical CHOTKHANDA PIPED WATER SUPPLY SCHEME , SM/13907 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at SAHAPUR & others water supply scheme under Memari-I Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. ASSISTANT ENGINEER Junior Engineer ORD/000100/2024-2025 2392/CMD 02/08/2024 90 MITRA ENTERPRISE 47.62 0.00 0 0
3097 PURBA BARDHAMAN Memari - I Central Mechanical CHOTKHANDA PIPED WATER SUPPLY SCHEME , SM/13907 New Supply & delivery of different electro-mechanical accessories (for urgent FHTC) for Tube well no.-I & II at Chotkhanda w/s scheme, (Block- Memari-1) under CMD, PHE Dte., Dist.- Purba-Bardhaman ASSISTANT ENGINEER Junior Engineer ORD/001902/2023-2024 540/CMSD 28/03/2024 7 S.K. ENTERPRISE 0.53 0.00 0 100
3098 PURBA BARDHAMAN Memari - I Burdwan Division CHOTKHANDA PIPED WATER SUPPLY SCHEME , SM/13907 New Restoration of concrete road by Cement concrete (mix 1:1.5:3), Providing balance FHTC, parallel pipeline, land development, Sluice valve chamber for smooth water supply of FHTC work for CHOTKHANDA PWSS and its adjoining mouzas within MEMARI-I BLOCK under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000930/2024-2025 4280/BWD 09/12/2024 90 TARAMA AGENCY 21.09 0.00 0 0
3099 PURBA BARDHAMAN Memari - I Burdwan Division CHOTKHANDA PIPED WATER SUPPLY SCHEME , SM/13907 New Material Requisition To Resource Division RTOR000061/2024-2025 387/BWD 17/01/2025 Resource Division 9.60 0.00 0 0
3100 PURBA BARDHAMAN Memari - I Central Mechanical CHOTKHANDA PIPED WATER SUPPLY SCHEME , SM/13907 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at Chotkhanda Water Supply Scheme [ Block- Memari-1 ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER Junior Engineer ORD/000731/2023-2024 4041/CMD 29/08/2023 369 S.K. ENTERPRISE 29.59 0.00 0 100
3101 PURBA BARDHAMAN Memari - I Burdwan Division CHOTKHANDA PIPED WATER SUPPLY SCHEME , SM/13907 New CHOTKHANDA Piped Water Supply Scheme with sinking of Tube-well, LDS, Rising Main, FHTC, Construction of 350 cum capacity RCC OHR with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drain and internal pathway at different TW site under Memari I Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000123/2023-2024 2306/BWD 19/05/2023 683 ASHOK KUMAR GHOSH 513.64 82.01 15.97 85
3102 PURBA BARDHAMAN Manteswar Burdwan Division GROUND WATER SUPPLY BASED PIPED WATER SUPPLY SCHEME FOR JAMNA PWSS IN MANTESHWAR BLOCK OF PURBA BARDHAMAN UNDER BURDWAN DIVISION PHE DTE , SM/13291 New Material Requisition To Resource Division RTOR000290/2023-2024 2197/BWD 12/05/2023 Resource Division 5.72 0.00 0 0
3103 PURBA BARDHAMAN Manteswar Burdwan Division GROUND WATER SUPPLY BASED PIPED WATER SUPPLY SCHEME FOR JAMNA PWSS IN MANTESHWAR BLOCK OF PURBA BARDHAMAN UNDER BURDWAN DIVISION PHE DTE , SM/13291 New Material Requisition To Resource Division RTOR000542/2023-2024 4307/BWD 29/09/2023 Resource Division 78.80 0.00 0 0
3104 PURBA BARDHAMAN Manteswar Burdwan Division GROUND WATER SUPPLY BASED PIPED WATER SUPPLY SCHEME FOR JAMNA PWSS IN MANTESHWAR BLOCK OF PURBA BARDHAMAN UNDER BURDWAN DIVISION PHE DTE , SM/13291 New Material Requisition To Resource Division RTOR000784/2023-2024 329/BWD 24/01/2024 Resource Division 36.64 0.00 0 0
3105 PURBA BARDHAMAN Manteswar Central Mechanical GROUND WATER SUPPLY BASED PIPED WATER SUPPLY SCHEME FOR JAMNA PWSS IN MANTESHWAR BLOCK OF PURBA BARDHAMAN UNDER BURDWAN DIVISION PHE DTE , SM/13291 New NEW SERVICE CONNECTION FOR JAMNA PWSS. BILL/02691/2023-2024 BP-2023-24-572 27/02/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.32 0.00 0 0
3106 PURBA BARDHAMAN Manteswar Central Mechanical GROUND WATER SUPPLY BASED PIPED WATER SUPPLY SCHEME FOR JAMNA PWSS IN MANTESHWAR BLOCK OF PURBA BARDHAMAN UNDER BURDWAN DIVISION PHE DTE , SM/13291 New NEW SERVICE CONNECTION FOR JAMNA PWSS TW -2. BILL/03106/2023-2024 BP-2023-24-646 15/03/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 4.48 0.00 0 0
3107 PURBA BARDHAMAN Manteswar Burdwan Division GROUND WATER SUPPLY BASED PIPED WATER SUPPLY SCHEME FOR JAMNA PWSS IN MANTESHWAR BLOCK OF PURBA BARDHAMAN UNDER BURDWAN DIVISION PHE DTE , SM/13291 New Continuation work order for supply of 01 (one) No. Diesel driven Motor Cab (Bharat Stage-III) on hire basis for the office of the Assistant Engineer, Durgapur Sub-Divison(Burdwan North), P.H.E. DTE. Govt. of West Bengal (for the period of 01/08/2024 to 30/09/2024) Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer1, Durgapur Sub-Division, PHE Dte. ORD/000552/2024-2025 602/DSD 30/07/2024 61 SUJAUDDIN SEKH 0.80 0.19 23.75 100
3108 PURBA BARDHAMAN Manteswar Burdwan Division GROUND WATER SUPPLY BASED PIPED WATER SUPPLY SCHEME FOR JAMNA PWSS IN MANTESHWAR BLOCK OF PURBA BARDHAMAN UNDER BURDWAN DIVISION PHE DTE , SM/13291 New Alt&ment of Fund due to damaged causes by PHED pipe tine work in connection with the work namely Construction of road from Jamna Samabay Samiti on PWD (Roads) to Moynampur more on Memari- Monteswar PWD Road via Dheuchanda, Katsihi Village under Monteswar Block in the District Purba Bardhaman under RIDF-XXVI|I BILL/00950/2024-2025 1051/JJM 05/11/2024 EXECUTIVE ENGINEER (WBSRDA) PURBA BARDHAMAN DIVISION 10.97 0.00 0 null
3109 PURBA BARDHAMAN Manteswar Burdwan Division GROUND WATER SUPPLY BASED PIPED WATER SUPPLY SCHEME FOR JAMNA PWSS IN MANTESHWAR BLOCK OF PURBA BARDHAMAN UNDER BURDWAN DIVISION PHE DTE , SM/13291 New Continuation work order for supply of 01 (one) No. Diesel driven Motor Cab (Bharat Stage-III) on hire basis for the office of the Assistant Engineer, Durgapur Sub-Divison(Burdwan North), P.H.E. DTE. Govt. of West Bengal (for the period of 01/10/2024 to 30/11/2024) Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer1, Durgapur Sub-Division, PHE Dte. ORD/000839/2024-2025 772/DSD 18/09/2024 61 SUJAUDDIN SEKH 0.80 0.26 32.5 0
3110 PURBA BARDHAMAN Manteswar Burdwan Division GROUND WATER SUPPLY BASED PIPED WATER SUPPLY SCHEME FOR JAMNA PWSS IN MANTESHWAR BLOCK OF PURBA BARDHAMAN UNDER BURDWAN DIVISION PHE DTE , SM/13291 New Material Requisition To Resource Division RTOR000058/2024-2025 384/BWD 17/01/2025 Resource Division 11.59 0.00 0 0
3111 PURBA BARDHAMAN Manteswar Burdwan Division GROUND WATER SUPPLY BASED PIPED WATER SUPPLY SCHEME FOR JAMNA PWSS IN MANTESHWAR BLOCK OF PURBA BARDHAMAN UNDER BURDWAN DIVISION PHE DTE , SM/13291 New Balance work for laying of pipeline, providing FHTC & other allied works in connection with Augmentation of MONTESWAR PWSS & SUTRA PWSS (SM/13280) under Kalna Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000980/2024-2025 3572/BWD 27/09/2024 181 BAKSHI ENTERPRISE 51.14 0.00 0 30
3112 PURBA BARDHAMAN Manteswar Burdwan Division GROUND WATER SUPPLY BASED PIPED WATER SUPPLY SCHEME FOR JAMNA PWSS IN MANTESHWAR BLOCK OF PURBA BARDHAMAN UNDER BURDWAN DIVISION PHE DTE , SM/13291 New Different works related (sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of different capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site) to BELENDA, JAMNA, PIPLON & PARGUNA Piped Water Supply Scheme under Manteswar Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer1, Durgapur Sub-Division, PHE Dte. ORD/000689/2023-2024 4388/BWD 05/10/2023 667 AKASH CONSTRUCTION 2,296.40 0.00 0 50
3113 PURBA BARDHAMAN Manteswar Central Mechanical GROUND WATER SUPPLY BASED PIPED WATER SUPPLY SCHEME FOR JAMNA PWSS IN MANTESHWAR BLOCK OF PURBA BARDHAMAN UNDER BURDWAN DIVISION PHE DTE , SM/13291 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Sutra & others water supply scheme under Monteswar Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000068/2024-2025 2396/CMD 02/08/2024 455 SINHA ELECTRICALS 78.06 0.00 0 20
3114 PURBA BARDHAMAN Manteswar Burdwan Division GROUND WATER SUPPLY BASED PIPED WATER SUPPLY SCHEME FOR JAMNA PWSS IN MANTESHWAR BLOCK OF PURBA BARDHAMAN UNDER BURDWAN DIVISION PHE DTE , SM/13291 New Continuation work order for supply of 01 (one) No. Diesel driven Motor Cab (Bharat Stage-III) on hire basis for the office of the Assistant Engineer, Durgapur Sub-Divison(Burdwan North), P.H.E. DTE. Govt. of West Bengal (for the period of 01/12/2024 to 31/12/2024) Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer1, Durgapur Sub-Division, PHE Dte. ORD/000994/2024-2025 992/DSD 25/11/2024 61 SUJAUDDIN SEKH 0.40 0.17 42.5 0
3115 PURBA BARDHAMAN Manteswar Central Mechanical GROUND WATER SUPPLY BASED PIPED WATER SUPPLY SCHEME FOR JAMNA PWSS IN MANTESHWAR BLOCK OF PURBA BARDHAMAN UNDER BURDWAN DIVISION PHE DTE , SM/13291 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at Jamna Water Supply Scheme [ Block- Monteshwar ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000738/2023-2024 4048/CMD 29/08/2023 703 MS DAS ELECTRIC CO 29.95 0.00 0 50
3116 PURBA BARDHAMAN Burdwan Division PROVIDING FUNCTIONAL HOUSEHOLD TAP CONNECTION FHTC BY RETROFITTING AT AGRADWIP MOUZA WITHIN THE COMMAND AREA AGRADWIP PIPED WATER SUPPLY SCHEME AT KATWA II BLOCK UNDER BURDWAN DIVISION PHE DTE PART B , SM/13043 Retrofitting Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of AGRADWIP Piped Water Supply Scheme at Agradwip, Babla danga, Gonsaidhowra, Saheb Nagar & Sarawaridhowra (Mouza), Katwa - II Block under Burdwan Division, PHE Dte. Assistant Engineer ORD/000445/2021-2022 6253/BWD 01/11/2021 60 SHUBHRA KANTI GHOSH 53.67 34.17 63.67 1
3117 PURBA BARDHAMAN Burdwan Division PROVIDING FUNCTIONAL HOUSEHOLD TAP CONNECTION FHTC BY RETROFITTING AT AGRADWIP MOUZA WITHIN THE COMMAND AREA AGRADWIP PIPED WATER SUPPLY SCHEME AT KATWA II BLOCK UNDER BURDWAN DIVISION PHE DTE PART B , SM/13043 Retrofitting Providing Functional Household Tap Connection from existing distribution system within the command area of AGRADWIP PWSS under Katwa Sub-Division under Burdwan Division PHE Dte. (Sl No-1) Assistant Engineer ORD/000237/2021-2022 688/KTS 08/10/2021 7 CHANCHAL PAL 1.21 1.20 99.17 1
3118 PURBA BARDHAMAN Burdwan Division PROVIDING FUNCTIONAL HOUSEHOLD TAP CONNECTION FHTC BY RETROFITTING AT AGRADWIP MOUZA WITHIN THE COMMAND AREA AGRADWIP PIPED WATER SUPPLY SCHEME AT KATWA II BLOCK UNDER BURDWAN DIVISION PHE DTE PART B , SM/13043 Retrofitting Extension of pipe line of Providing Functional Household Tap Connection (FHTC) from existing distribution system within command area of Agradwip Water Supply Schame under Agradwip PWSS at Gonsaishowra, & Sarawaridhowar Habitation Katwa-II Block Katwa Sub-Division under Burdwan Division PHE Dte.. [Sl No-05] Assistant Engineer ORD/000608/2021-2022 172/KTS 25/02/2022 7 SHUBHRA KANTI GHOSH 1.32 1.30 98.48 1
3119 PURBA BARDHAMAN Burdwan Division PROVIDING FUNCTIONAL HOUSEHOLD TAP CONNECTION FHTC BY RETROFITTING AT AGRADWIP MOUZA WITHIN THE COMMAND AREA AGRADWIP PIPED WATER SUPPLY SCHEME AT KATWA II BLOCK UNDER BURDWAN DIVISION PHE DTE PART B , SM/13043 Retrofitting Extension of pipe line of Providing Functional Household Tap Connection (FHTC) from existing distribution system within command area of Agradwip Water Supply Schame under Agradwip PWSS at Babla danga and Saheb Nagar Habitation Katwa-II Block Katwa Sub-Division under Burdwan Division PHE Dte.. [Sl No-02] Assistant Engineer ORD/000605/2021-2022 161/KTS 24/02/2022 7 SHUBHRA KANTI GHOSH 2.10 2.08 99.05 1
3120 PURBA BARDHAMAN Burdwan Division PROVIDING FUNCTIONAL HOUSEHOLD TAP CONNECTION FHTC BY RETROFITTING AT AGRADWIP MOUZA WITHIN THE COMMAND AREA AGRADWIP PIPED WATER SUPPLY SCHEME AT KATWA II BLOCK UNDER BURDWAN DIVISION PHE DTE PART B , SM/13043 Retrofitting Supplying and laying of valves along with construction of valve chamber at the existing distribution pipe line of Agradwip PWSS under Katwa Sub-Division under Burdwan Division, PHE Dte [Sl No-04] Assistant Engineer ORD/000157/2022-2023 440/KTS 27/06/2022 30 TAPAS KUMAR ROY 0.78 0.78 100 1
3121 PURBA BARDHAMAN Burdwan Division PROVIDING FUNCTIONAL HOUSEHOLD TAP CONNECTION FHTC BY RETROFITTING AT AGRADWIP MOUZA WITHIN THE COMMAND AREA AGRADWIP PIPED WATER SUPPLY SCHEME AT KATWA II BLOCK UNDER BURDWAN DIVISION PHE DTE PART B , SM/13043 Retrofitting Detail route survey, design of distribution network and preparation of estimate, drawing & DPR for providing FHTC in the scheme AGRADWIP, KHETPUR PALASHI, SAHAPUR PWSS (Sl No-1) Assistant Engineer JUNIOR ENGINEER KATWA SUB-DIVISION PHE DTE ORD/000069/2023-2024 393/KTS 13/04/2023 30 SIRCON ENGINEERING SERVICES 3.71 0.62 16.71 100
3122 PURBA BARDHAMAN Memari - II Burdwan Division GHOSHPUR PIPED WATER SUPPLY SCHEME , SM/13947 New Material Requisition To Resource Division RTOR000259/2023-2024 2197/BWD 12/05/2023 Resource Division 15.58 0.00 0 0
3123 PURBA BARDHAMAN Memari - II Burdwan Division GHOSHPUR PIPED WATER SUPPLY SCHEME , SM/13947 New Material Requisition To Resource Division RTOR000468/2023-2024 3992/BWD 08/09/2023 Resource Division 12.78 0.00 0 0
3124 PURBA BARDHAMAN Memari - II Burdwan Division GHOSHPUR PIPED WATER SUPPLY SCHEME , SM/13947 New Material Requisition To Resource Division RTOR000668/2023-2024 5089/BWD 23/11/2023 Resource Division 20.46 0.00 0 0
3125 PURBA BARDHAMAN Memari - II Burdwan Division GHOSHPUR PIPED WATER SUPPLY SCHEME , SM/13947 New Continuation Work Order supply of inspection Vehicle for inspection of different JJM related(schemes)works as and when required including supply of driver & fuel(minimum 8 hours duty per day) and all taxes etc. for Burdwan Sub-Division under Burdwan Division,PHE Dte consider 96.00 Km. run per day (Period from 01-11-2023 to 31-01-2024) ORD/000985/2023-2024 2561/BSD 30/10/2023 66 MD HASIN 0.85 0.00 0 0
3126 PURBA BARDHAMAN Memari - II Central Mechanical GHOSHPUR PIPED WATER SUPPLY SCHEME , SM/13947 New New service connection at Ghoshpur PWSS TW -1 BILL/02330/2023-2024 BP-2023-24-446 29/01/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 5.28 0.00 0 0
3127 PURBA BARDHAMAN Memari - II Central Mechanical GHOSHPUR PIPED WATER SUPPLY SCHEME , SM/13947 New NEW SERVICE CONNECTION FOR GHOSHPUR PWSS. BILL/02701/2023-2024 BP-2023-24-566 27/02/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 6.97 0.00 0 0
3128 PURBA BARDHAMAN Memari - II Central Mechanical GHOSHPUR PIPED WATER SUPPLY SCHEME , SM/13947 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System, Internal House Wiring and Compound lighting arrangement for Tube well No.- 1 & 2 at GHOSHPUR Water Supply Scheme [BLOCK- MEMARI- 2] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER Junior Engineer ORD/001603/2023-2024 1533/CMD 05/03/2024 60 CHOUDHURY ENTERPRISE 28.82 0.00 0 75
3129 PURBA BARDHAMAN Memari - II Burdwan Division GHOSHPUR PIPED WATER SUPPLY SCHEME , SM/13947 New GHOSHPUR Piped Water Supply Scheme with sinking of Tube-well, LDS, Rising Main, FHTC, Construction of 250 cum capacity RCC OHR with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drain and internal pathway at different TW site under Memari-II Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER RWS BURDWAN SUB-DIVISION PHE DTE ORD/000110/2023-2024 2299/BWD 19/05/2023 958 MLG CONSTRUCTION 441.87 35.87 8.12 52
3130 PURBA BARDHAMAN Memari - II Burdwan Division GHOSHPUR PIPED WATER SUPPLY SCHEME , SM/13947 New Continuation Work Order for supply of inspection Vehicle for inspection of different JJM related (schemes)works as and when required including supply of driver & fuel(minimum 8 hours duty per day) and all taxes etc. for Burdwan Sub-Division under Burdwan Division,PHE Dte consider 96.00 Km. run per day (Period from 01-11-2024 to 31-01-2025) JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000896/2024-2025 2438/BSD 29/10/2024 66 PARVIN BEGAM 0.85 0.28 32.94 0
3131 PURBA BARDHAMAN Memari - II Burdwan Division GHOSHPUR PIPED WATER SUPPLY SCHEME , SM/13947 New Construction of Road from Ashapur More to Adorsha Palli via Belui Adibasipara. BILL/01126/2024-2025 1517/JJM 18/03/2025 PURBA BARDHAMAN ZILLA PARISHAD 1.90 0.00 0 null
3132 PURBA BARDHAMAN Memari - II Central Mechanical GHOSHPUR PIPED WATER SUPPLY SCHEME , SM/13947 New Electric quotation bill for New service connection at GHOSHPUR water supply scheme, P.H No.-3 (Block- Memari-2) BILL/00077/2025-2026 null 22/04/2025 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 6.41 0.00 0 null
3133 PURBA BARDHAMAN Burdwan - II Burdwan Division Gangua Piped Water Supply Scheme , SM/13295 New Material Requisition To Resource Division RTOR000257/2023-2024 2197/BWD 12/05/2023 Resource Division 11.50 0.00 0 0
3134 PURBA BARDHAMAN Burdwan - II Burdwan Division Gangua Piped Water Supply Scheme , SM/13295 New Material Requisition To Resource Division RTOR000514/2023-2024 4038/BWD 08/09/2023 Resource Division 0.41 0.00 0 0
3135 PURBA BARDHAMAN Burdwan - II Burdwan Division Gangua Piped Water Supply Scheme , SM/13295 New Material Requisition To Resource Division RTOR000667/2023-2024 5088/BWD 23/11/2023 Resource Division 20.46 0.00 0 0
3136 PURBA BARDHAMAN Burdwan - II Burdwan Division Gangua Piped Water Supply Scheme , SM/13295 New Supply of Inspection Vehicle for inspection of different JJM related (Schemes) works as and when required including supply of driver & fuel (minimum 8 Hours duty per day) and all taxes etc. for Burdwan Sub-Division under Burdwan Division, P.H.E. Dte. consider 96.00 Km. run per day.[Period from 01/08/2023 to 31/10/2023] ORD/000845/2023-2024 1759/BSD 28/07/2023 66 MD HASIN 0.85 0.00 0 0
3137 PURBA BARDHAMAN Burdwan - II Central Mechanical Gangua Piped Water Supply Scheme , SM/13295 New New service connection for Gangua W/S scheme TW No-1 BILL/02274/2023-2024 BP-2023-24-409 19/01/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 8.34 0.00 0 0
3138 PURBA BARDHAMAN Burdwan - II Central Mechanical Gangua Piped Water Supply Scheme , SM/13295 New New service connection for Gangua PWSS TW 2 BILL/02414/2023-2024 BP-2023-24-512 08/02/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 8.61 0.00 0 0
3139 PURBA BARDHAMAN Burdwan - II Central Mechanical Gangua Piped Water Supply Scheme , SM/13295 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at KUSHA & others water supply scheme under Bardhaman-II Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman ASSISTANT ENGINEER Junior Engineer ORD/000065/2024-2025 2389/CMD 02/08/2024 90 DILIP MAHATO 53.14 0.00 0 0
3140 PURBA BARDHAMAN Burdwan - II Central Mechanical Gangua Piped Water Supply Scheme , SM/13295 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at Gangua Water Supply Scheme [ Block- Burdwan-2 ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER Junior Engineer ORD/000649/2023-2024 3992/CMD 29/08/2023 30 C.M. ENTERPRISE 28.85 0.00 0 90
3141 PURBA BARDHAMAN Burdwan - II Burdwan Division Gangua Piped Water Supply Scheme , SM/13295 New GANGUA Piped Water Supply Scheme with Sinking of tube-well, LDS, Rising Main, FHTC, Construction of 150 cum capacity RCC OHR with 20.0 mtr. with Staging height including soil investigation & construction of switch-rooms & boundary walls at different TW site under Burdwan-II Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. Junior Engineer, Burdwan Sadar Sub-Division ORD/000525/2023-2024 3616/BWD 18/08/2023 592 SHIVAM UN-EMPLOYED ENGINEERS CO-OPERATIVE SOCIETY LTD. 340.75 36.74 10.78 95
3142 PURBA BARDHAMAN Purbasthali - I Burdwan Division LAKSHAMPUR PIPED WATER SUPPLY SCHEME , SM/13493 New Material Requisition To Resource Division RTOR000166/2023-2024 2155/BWD 10/05/2023 Resource Division 6.59 0.00 0 0
3143 PURBA BARDHAMAN Purbasthali - I Burdwan Division LAKSHAMPUR PIPED WATER SUPPLY SCHEME , SM/13493 New Material Requisition To Resource Division RTOR000394/2023-2024 2197/BWD 12/05/2023 Resource Division 12.66 0.00 0 0
3144 PURBA BARDHAMAN Purbasthali - I Central Mechanical LAKSHAMPUR PIPED WATER SUPPLY SCHEME , SM/13493 New New service connection charges for Lakshampur PWSS TW-1 BILL/00752/2023-2024 BP-2023-24-55 14/07/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 5.74 0.00 0 0
3145 PURBA BARDHAMAN Purbasthali - I Burdwan Division LAKSHAMPUR PIPED WATER SUPPLY SCHEME , SM/13493 New Material Requisition To Resource Division RTOR000413/2023-2024 3867/BWD 01/09/2023 Resource Division 0.14 0.00 0 0
3146 PURBA BARDHAMAN Purbasthali - I Central Mechanical LAKSHAMPUR PIPED WATER SUPPLY SCHEME , SM/13493 New Addl. quotation for new service connection charges for Laxmanpur PWSS BILL/01459/2023-2024 BP-2023-24-157 11/09/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 0.54 0.00 0 0
3147 PURBA BARDHAMAN Purbasthali - I Central Mechanical LAKSHAMPUR PIPED WATER SUPPLY SCHEME , SM/13493 New New service connection for Laxmanpur PWSS PH-1 BILL/02315/2023-2024 BP-2023-24-454 30/01/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 2.01 0.00 0 0
3148 PURBA BARDHAMAN Purbasthali - I Central Mechanical LAKSHAMPUR PIPED WATER SUPPLY SCHEME , SM/13493 New Supply & Installation of Submersible Pumping Machinery , Voltage Stabilizer, Chlorination system and internal House wiring for Tube well no.- 1 & 2 at LAKSHAMPUR Water Supply Scheme [Block - PURBASTHALI-1] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000124/2023-2024 2639/CMD 14/06/2023 30 C.M. ENTERPRISE 20.81 4.67 22.44 60
3149 PURBA BARDHAMAN Purbasthali - I Burdwan Division LAKSHAMPUR PIPED WATER SUPPLY SCHEME , SM/13493 New LAKSHAMPUR Piped Water Supply Scheme with sinking of Tube-well, LDS, Rising Main, FHTC, with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drain and internal pathway at different TW site under Purbasthali-I Block, District:- Purba-Bardhaman [NEW SCHEME]. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000799/2022-2023 1518/BWD 28/03/2023 90 JAHAR GHOSH 42.34 30.74 72.6 40
3150 PURBA BARDHAMAN Purbasthali - I Central Mechanical LAKSHAMPUR PIPED WATER SUPPLY SCHEME , SM/13493 New Withdrawing of pump motor set due to low discharge and installation of new pump motor set at Lakshampur PH 1 water supply scheme under CMD P.H.E. Dte. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/001891/2023-2024 363/CMSD 28/02/2024 15 C.M. ENTERPRISE 0.67 0.00 0 0
3151 PURBA BARDHAMAN Purbasthali - I Burdwan Division LAKSHAMPUR PIPED WATER SUPPLY SCHEME , SM/13493 New Different Types of work involved in connection with Augmentation of RAHATPUR (SM/16306) & LAKSHMANPUR (SM/13493) Piped water supply scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000176/2024-2025 2069/BWD 07/06/2024 120 SAIKAT RAY 213.73 0.00 0 2
3152 PURBA BARDHAMAN Purbasthali - I Central Mechanical LAKSHAMPUR PIPED WATER SUPPLY SCHEME , SM/13493 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Manganpur & others water supply scheme under Purbasthali 1 Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000714/2024-2025 2979/CMD 25/11/2024 90 H.K. DAS & CO. 53.27 0.00 0 0
3153 PURBA BARDHAMAN Ausgram - I Burdwan Division JADABGANJ PIPED WATER SUPPLY SCHEME , SM/13966 New Material Requisition To Resource Division RTOR000285/2023-2024 2197/BWD 12/05/2023 Resource Division 13.54 0.00 0 0
3154 PURBA BARDHAMAN Ausgram - I Burdwan Division JADABGANJ PIPED WATER SUPPLY SCHEME , SM/13966 New Material Requisition To Resource Division RTOR000552/2023-2024 4285/BWD 29/09/2023 Resource Division 47.10 0.00 0 0
3155 PURBA BARDHAMAN Ausgram - I Burdwan Division JADABGANJ PIPED WATER SUPPLY SCHEME , SM/13966 New Material Requisition To Resource Division RTOR000579/2023-2024 4927/BWD 10/11/2023 Resource Division 36.98 0.00 0 0
3156 PURBA BARDHAMAN Ausgram - I Central Mechanical JADABGANJ PIPED WATER SUPPLY SCHEME , SM/13966 New New service connection at Jadabganj PWSS PH-1 BILL/02313/2023-2024 BP-2023-24-432 29/01/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 7.24 0.00 0 0
3157 PURBA BARDHAMAN Ausgram - I Central Mechanical JADABGANJ PIPED WATER SUPPLY SCHEME , SM/13966 New QUOTATION FOR NEW SERVICE CONNECTION AT JADABGANJ PWSS TW-2 BILL/00370/2024-2025 BP-2024-25-191 08/07/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 6.70 0.00 0 0
3158 PURBA BARDHAMAN Ausgram - I Durgapur W/S Division JADABGANJ PIPED WATER SUPPLY SCHEME , SM/13966 New Acceptance cum Formal Work Order for Repairing and Renovation of Existing Room for prepair of Laboratory Room and Store Room , Boundary Wall with Gate, side drain with necessary allied works at Galsi-II Head Works site under Jadabganj Pipe Water Supply Scheme (JJM) under Durgapur W/S Division, PHE Dte. Assistant Engineer-II JUNIOR ENGINEER-2 ORD/000125/2024-2025 1113/DWSD 02/08/2024 120 SAIKAT RAY 25.70 0.00 0 0
3159 PURBA BARDHAMAN Ausgram - I Durgapur W/S Division JADABGANJ PIPED WATER SUPPLY SCHEME , SM/13966 New Acceptance cum Formal Work Order for Demarcation of new land of PHE site under various places (Jadabganj PWSS) under Durgapur W/S Division, PHE Dte. Assistant Engineer-II JUNIOR ENGINEER-2 ORD/000133/2024-2025 1243/DWSD 29/08/2024 30 SAIKAT RAY 28.57 0.00 0 80
3160 PURBA BARDHAMAN Ausgram - I Central Mechanical JADABGANJ PIPED WATER SUPPLY SCHEME , SM/13966 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Pichkuri, karatia & others water supply scheme under Ausgram-1 Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman Driller In-Charge JUNIOR ENGINEER ORD/000398/2024-2025 2764/CMD 26/09/2024 90 JAL PRAVAHIKA PVT LTD 52.55 0.00 0 0
3161 PURBA BARDHAMAN Ausgram - I Durgapur W/S Division JADABGANJ PIPED WATER SUPPLY SCHEME , SM/13966 New Continution Work Order for Demarcation of new land of PHE site under various places (Jadabganj PWSS) under Durgapur W/S Division, PHE Dte. Assistant Engineer-II JUNIOR ENGINEER-2 ORD/000143/2024-2025 1312/DWSD 12/09/2024 15 SAIKAT RAY 28.57 0.00 0 70
3162 PURBA BARDHAMAN Ausgram - I Durgapur W/S Division JADABGANJ PIPED WATER SUPPLY SCHEME , SM/13966 New Continution Work Order for Repairing and Renovation of Existing Room for prepair of Laboratory Room and Store Room , Boundary Wall with Gate, side drain with necessary allied works at Galsi-II Head Works site under Jadabganj Pipe Water Supply Scheme (JJM) under Durgapur W/S Division, PHE Dte. Assistant Engineer-II JUNIOR ENGINEER-2 ORD/000144/2024-2025 1348/DWSD 20/09/2024 120 SAIKAT RAY 25.70 0.00 0 30
3163 PURBA BARDHAMAN Ausgram - I Durgapur W/S Division JADABGANJ PIPED WATER SUPPLY SCHEME , SM/13966 New Material Requisition To Resource Division RTOR000020/2024-2025 2/A/DWSD 02/01/2025 Resource Division 63.36 0.00 0 0
3164 PURBA BARDHAMAN Ausgram - I Central Mechanical JADABGANJ PIPED WATER SUPPLY SCHEME , SM/13966 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at Jadabganj Water Supply Scheme [ Block- Ausgram-1 ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. Driller In-Charge JUNIOR ENGINEER ORD/000767/2023-2024 4065/CMD 29/08/2023 620 M/S. SWAPAN BANERJEE 27.78 0.00 0 96
3165 PURBA BARDHAMAN Ausgram - I Durgapur W/S Division JADABGANJ PIPED WATER SUPPLY SCHEME , SM/13966 New Continution Work Order for Demarcation of new land of PHE site under various places (Jadabganj PWSS) under Durgapur W/S Division, PHE Dte. Assistant Engineer-II JUNIOR ENGINEER-2 ORD/000222/2024-2025 1658/DWSD 29/11/2024 30 SAIKAT RAY 28.57 0.00 0 90
3166 PURBA BARDHAMAN Ausgram - I Burdwan Division JADABGANJ PIPED WATER SUPPLY SCHEME , SM/13966 New Different works related (sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of different capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site) to ALIGRAM, JAYKRISHNAPUR, JADABGANJ & KALYANPUR Piped Water Supply Scheme under AUSGRAM-I Block, District:- Purba-Bardhaman [NEW SCHEME] AE(HQs) JUNIOR ENGINEER R.W.S. BURDWAN SUB-DIVISION PHE DTE ORD/000727/2023-2024 4581/BWD 16/10/2023 965 SAFECO ENTERPRISES 1,551.98 0.00 0 60
3167 PURBA BARDHAMAN Bhatar Burdwan Division EORA PIPED WATER SUPPLY SCHEME , SM/13968 New Material Requisition To Resource Division RTOR000187/2023-2024 2155/BWD 10/05/2023 Resource Division 23.59 0.00 0 0
3168 PURBA BARDHAMAN Bhatar Burdwan Division EORA PIPED WATER SUPPLY SCHEME , SM/13968 New Material Requisition To Resource Division RTOR000443/2023-2024 3833/BWD 01/09/2023 Resource Division 3.71 0.00 0 0
3169 PURBA BARDHAMAN Bhatar Burdwan Division EORA PIPED WATER SUPPLY SCHEME , SM/13968 New Material Requisition To Resource Division RTOR000750/2023-2024 5249/BWD 30/11/2023 Resource Division 18.50 0.00 0 0
3170 PURBA BARDHAMAN Bhatar Central Mechanical EORA PIPED WATER SUPPLY SCHEME , SM/13968 New NEW SERVICE CONNECTION FOR EORA PWSS BILL/02596/2023-2024 BP-2023-24-548 20/02/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.64 0.00 0 0
3171 PURBA BARDHAMAN Bhatar Burdwan Division EORA PIPED WATER SUPPLY SCHEME , SM/13968 New EORA Piped Water Supply Scheme with sinking of Tube-well, LDS, Rising Main, FHTC & construction of switch rooms & boundary walls with gates and land development, drain and internal pathway at different TW site under Bhatar Block, District:- Purba-Bardhaman [NEW SCHEME]. Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer ,JUNIOR ENGINEER DURGAPUR SUB-DIVISION PHE DTE ORD/000062/2023-2024 1936/BWD 24/04/2023 60 TUSHAR KANTI GHOSH 79.02 0.00 0 50
3172 PURBA BARDHAMAN Bhatar Central Mechanical EORA PIPED WATER SUPPLY SCHEME , SM/13968 New NEW SERVICE CONNECTION FOR EORA PWSS TW -1. BILL/03102/2023-2024 BP-2023-24-642 15/03/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 6.54 0.00 0 0
3173 PURBA BARDHAMAN Bhatar Burdwan Division EORA PIPED WATER SUPPLY SCHEME , SM/13968 New Road Restoration for Eora PWSS in Bhatar Block under Durgapur Sub-Division under Burdwan Division, P.H.E. Dte. ORD/000429/2024-2025 624/DSD 05/08/2024 30 KOHINOOR CONSTRUCTION CO. 5.38 0.00 0 0
3174 PURBA BARDHAMAN Bhatar Central Mechanical EORA PIPED WATER SUPPLY SCHEME , SM/13968 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Karjana & others water supply scheme under Bhatar Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000067/2024-2025 2394/CMD 02/08/2024 90 AHALYA ENGINEERING WORKS 82.00 0.00 0 0
3175 PURBA BARDHAMAN Bhatar Central Mechanical EORA PIPED WATER SUPPLY SCHEME , SM/13968 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at Eora Water Supply Scheme [ Block- Bhatar ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000746/2023-2024 4056/CMD 29/08/2023 990 SUNRISE ENGINEERING CORPORATION 26.98 20.94 77.61 90
3176 PURBA BARDHAMAN Katwa - II Burdwan Division SRIBATI PIPED WATER SUPPLY SCHEME , SM/14055 New Material Requisition To Resource Division RTOR000061/2022-2023 1258/BWD 17/03/2023 Resource Division 17.24 0.00 0 0
3177 PURBA BARDHAMAN Katwa - II Burdwan Division SRIBATI PIPED WATER SUPPLY SCHEME , SM/14055 New Material Requisition To Resource Division RTOR000110/2022-2023 1633/BWD 06/04/2023 Resource Division 9.14 0.00 0 0
3178 PURBA BARDHAMAN Katwa - II Central Mechanical SRIBATI PIPED WATER SUPPLY SCHEME , SM/14055 New New service connection charges for Sribati PWSS TW-2 BILL/00755/2023-2024 BP-2023-24-61 17/07/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 2.58 0.00 0 0
3179 PURBA BARDHAMAN Katwa - II Central Mechanical SRIBATI PIPED WATER SUPPLY SCHEME , SM/14055 New New service connection charges for SribatiPWSS TW-1 BILL/00881/2023-2024 BP-2023-24-111 09/08/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 6.83 0.00 0 0
3180 PURBA BARDHAMAN Katwa - II Burdwan Division SRIBATI PIPED WATER SUPPLY SCHEME , SM/14055 New Supply of 1 (one) No. Inspection Vehicle for different JJM Related Works as and when required including supply of driver and fuels (Minimum 8 Hours of duty) under Katwa Sub-Division within Burdwan Division, P.H.E. Dte. Consider 96.00 Km run per Day.(Sl No-1) ORD/000510/2023-2024 499/KTS 22/05/2023 70 M/S MUNMUN DEY 0.90 0.00 0 100
3181 PURBA BARDHAMAN Katwa - II Burdwan Division SRIBATI PIPED WATER SUPPLY SCHEME , SM/14055 New Material Requisition To Resource Division RTOR000787/2023-2024 321/BWD 24/01/2024 Resource Division 26.68 0.00 0 0
3182 PURBA BARDHAMAN Katwa - II Central Mechanical SRIBATI PIPED WATER SUPPLY SCHEME , SM/14055 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at Sribati Water Supply Scheme [ Block- Katwa-2 ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. Driller In-Charge Junior Engineer ORD/000059/2023-2024 2520/CMD 02/06/2023 30 S.K. ELECTRICALS 29.60 0.00 0 48
3183 PURBA BARDHAMAN Katwa - II Central Mechanical SRIBATI PIPED WATER SUPPLY SCHEME , SM/14055 New SUPPLY AND INSTALLATION WORKS FOR SRIBATI PWSS BILL/02622/2023-2024 BP-2023-24-559 21/02/2024 S.K. ELECTRICALS 23.73 0.00 0 0
3184 PURBA BARDHAMAN Katwa - II Central Mechanical SRIBATI PIPED WATER SUPPLY SCHEME , SM/14055 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Mulgram & others water supply scheme under Katwa-II Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. ASSISTANT ENGINEER Junior Engineer ORD/000070/2024-2025 2409/CMD 02/08/2024 90 DUTTA ENTERPRISE 50.18 0.00 0 0
3185 PURBA BARDHAMAN Katwa - II Burdwan Division SRIBATI PIPED WATER SUPPLY SCHEME , SM/14055 New SRIBATI Piped Water Supply Scheme with sinking of Tube-well, LDS, Rising Main, FHTC, Construction of 400 cum capacity RCC OHR with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drain and internal pathway at different TW site under KATWA -II Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer JUNIOR ENGINEER KATWA SUB-DIVISION PHE DTE ORD/000710/2022-2023 776/BWD 24/02/2023 677 MANASH GHOSH 629.32 282.94 44.96 80
3186 PURBA BARDHAMAN Purbasthali - I Burdwan Division KONRAPUR PIPED WATER SUPPLY SCHEME , SM/13419 New Material Requisition To Resource Division RTOR000161/2023-2024 2155/BWD 10/05/2023 Resource Division 8.28 0.00 0 0
3187 PURBA BARDHAMAN Purbasthali - I Burdwan Division KONRAPUR PIPED WATER SUPPLY SCHEME , SM/13419 New Material Requisition To Resource Division RTOR000471/2023-2024 3995/BWD 08/09/2023 Resource Division 11.87 0.00 0 0
3188 PURBA BARDHAMAN Purbasthali - I Burdwan Division KONRAPUR PIPED WATER SUPPLY SCHEME , SM/13419 New Material Requisition To Resource Division RTOR000800/2023-2024 309/BWD 24/01/2024 Resource Division 16.10 0.00 0 0
3189 PURBA BARDHAMAN Purbasthali - I Central Mechanical KONRAPUR PIPED WATER SUPPLY SCHEME , SM/13419 New NEW SERVICE CONNECTION FOR KONRAPUR PWSS BILL/02694/2023-2024 BP-2023-24-567 27/02/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.54 0.00 0 0
3190 PURBA BARDHAMAN Purbasthali - I Central Mechanical KONRAPUR PIPED WATER SUPPLY SCHEME , SM/13419 New NEW SERVICE CONNECTION FOR KONRAPUR PWSS. BILL/02695/2023-2024 BP-2023-24-568 27/02/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 12.76 0.00 0 0
3191 PURBA BARDHAMAN Purbasthali - I Central Mechanical KONRAPUR PIPED WATER SUPPLY SCHEME , SM/13419 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Haripur & others water supply scheme under purbasthali 1 Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000072/2024-2025 2397/CMD 02/08/2024 90 CHATTERJEE ENTERPRISE 48.60 0.00 0 0
3192 PURBA BARDHAMAN Purbasthali - I Burdwan Division KONRAPUR PIPED WATER SUPPLY SCHEME , SM/13419 New Different works related (sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of different capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site) to KONRAPUR & MASGARIA Piped Water Supply Scheme under Purbasthali-I Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000026/2023-2024 1765/BWD 17/04/2023 365 M/S ASHA CONSTRUCTION 710.72 117.88 16.59 43
3193 PURBA BARDHAMAN Purbasthali - I Central Mechanical KONRAPUR PIPED WATER SUPPLY SCHEME , SM/13419 New Supply & Installation of Submersible Pumping Machinery , Voltage Stabilizer, Chlorination System and Internal House wiring for Tube well no.- 1 & 2 at KONRAPUR Water Supply Scheme [Block-PURBASTHALI-1] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/001056/2023-2024 4198/CMD 29/08/2023 30 MITRA ASSOCIATES 21.47 0.00 0 50
3194 PURBA BARDHAMAN Purbasthali - I Burdwan Division KONRAPUR PIPED WATER SUPPLY SCHEME , SM/13419 New Different types of balance works involve in connection with KONRAPUR (SM/13419) & MASGORIA (SM/13318) Piped water supply scheme under Purbasthali-I Block within Kalna Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/001028/2024-2025 142/BWD 08/01/2025 120 M/S ASHA CONSTRUCTION 65.74 0.00 0 0
3195 PURBA BARDHAMAN Purbasthali - I Burdwan Division KONRAPUR PIPED WATER SUPPLY SCHEME , SM/13419 New Material Requisition To Resource Division RTOR000056/2024-2025 419/BWD 17/01/2025 Resource Division 1.80 0.00 0 0
3196 PURBA BARDHAMAN Bhatar Burdwan Division NABASTA PIPED WATER SUPPLY SCHEME , SM/14059 New Material Requisition To Resource Division RTOR000077/2023-2024 1962/BWD 25/04/2023 Resource Division 80.57 0.00 0 0
3197 PURBA BARDHAMAN Bhatar Burdwan Division NABASTA PIPED WATER SUPPLY SCHEME , SM/14059 New Material Requisition To Resource Division RTOR000348/2023-2024 2197/BWD 12/05/2023 Resource Division 3.49 0.00 0 0
3198 PURBA BARDHAMAN Bhatar Burdwan Division NABASTA PIPED WATER SUPPLY SCHEME , SM/14059 New Material Requisition To Resource Division RTOR000604/2023-2024 4931/BWD 10/11/2023 Resource Division 33.07 0.00 0 0
3199 PURBA BARDHAMAN Bhatar Central Mechanical NABASTA PIPED WATER SUPPLY SCHEME , SM/14059 New New Service connection at Nabastha PWSS PH-2 BILL/02317/2023-2024 BP-2023-24-457 30/01/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.95 0.00 0 0
3200 PURBA BARDHAMAN Bhatar Central Mechanical NABASTA PIPED WATER SUPPLY SCHEME , SM/14059 New New Service connection at Nabastha PWSS PH-1 BILL/02316/2023-2024 BP-2023-24-456 30/01/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 6.04 0.00 0 0
3201 PURBA BARDHAMAN Bhatar Central Mechanical NABASTA PIPED WATER SUPPLY SCHEME , SM/14059 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at NABASTA Water Supply Scheme [ Block-BHATAR ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000776/2023-2024 4070/CMD 29/08/2023 30 M/S, S.S. ENTERPRISE. 27.79 0.00 0 40
3202 PURBA BARDHAMAN Bhatar Central Mechanical NABASTA PIPED WATER SUPPLY SCHEME , SM/14059 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Karjana & others water supply scheme under Bhatar Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000067/2024-2025 2394/CMD 02/08/2024 90 AHALYA ENGINEERING WORKS 82.00 0.00 0 0
3203 PURBA BARDHAMAN Bhatar Burdwan Division NABASTA PIPED WATER SUPPLY SCHEME , SM/14059 New Different works related (sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of different capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site) to NABASTA, PASHALA & POALKURA Piped Water Supply Scheme under Bhatar Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer1, Durgapur Sub-Division, PHE Dte.,Junior Engineer2, Durgapur Sub-Division, PHE Dte. ORD/000739/2023-2024 4652/BWD 31/10/2023 702 STARCO CONSTRUCTIONS 900.17 0.00 0 2
3204 PURBA BARDHAMAN Bhatar Burdwan Division NABASTA PIPED WATER SUPPLY SCHEME , SM/14059 New Providing Parallal LDS (Node- 30-43-42-41-49 to 36) & 4nos ICDS connection for at Palsa-Chandrasekharpara within Nabastha PWSS, Bardhhaman-II Development Block under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/001068/2024-2025 358/BWD 16/01/2025 60 PRATIVA CONSTRUCTION 7.61 0.00 0 0
3205 PURBA BARDHAMAN Bhatar Burdwan Division NABASTA PIPED WATER SUPPLY SCHEME , SM/14059 New Material Requisition To Resource Division RTOR000069/2024-2025 395/BWD 17/01/2025 Resource Division 5.84 0.00 0 0
3206 PURBA BARDHAMAN Bhatar Burdwan Division NABASTA PIPED WATER SUPPLY SCHEME , SM/14059 New Different Types of work involved in connection with different Augmentation & New Schemes (11 Nos.) Piped Water Supply Scheme under Burdwan II Block within Burdwan Sub-Div., under Burdwan Division PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/001349/2024-2025 1060/BWD 25/03/2025 120 R.G. INFRASTRUCTURE 262.23 0.00 0 0
3207 PURBA BARDHAMAN Manteswar Burdwan Division GROUND WATER SUPPLY BASED PIPED WATER SUPPLY SCHEME FOR PARGUNA PWSS IN MANTESHWAR BLOCK OF PURBA BARDHAMAN UNDER BURDWAN DIVISION PHE DTE , SM/13282 New Material Requisition To Resource Division RTOR000364/2023-2024 2197/BWD 12/05/2023 Resource Division 11.04 0.00 0 0
3208 PURBA BARDHAMAN Manteswar Burdwan Division GROUND WATER SUPPLY BASED PIPED WATER SUPPLY SCHEME FOR PARGUNA PWSS IN MANTESHWAR BLOCK OF PURBA BARDHAMAN UNDER BURDWAN DIVISION PHE DTE , SM/13282 New Material Requisition To Resource Division RTOR000544/2023-2024 4298/BWD 29/09/2023 Resource Division 136.65 0.00 0 0
3209 PURBA BARDHAMAN Manteswar Central Mechanical GROUND WATER SUPPLY BASED PIPED WATER SUPPLY SCHEME FOR PARGUNA PWSS IN MANTESHWAR BLOCK OF PURBA BARDHAMAN UNDER BURDWAN DIVISION PHE DTE , SM/13282 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at Parguna Water Supply Scheme [ Block- Monteshwar ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000737/2023-2024 4047/CMD 29/08/2023 30 SINHA ELECTRICALS 27.78 0.00 0 0
3210 PURBA BARDHAMAN Manteswar Central Mechanical GROUND WATER SUPPLY BASED PIPED WATER SUPPLY SCHEME FOR PARGUNA PWSS IN MANTESHWAR BLOCK OF PURBA BARDHAMAN UNDER BURDWAN DIVISION PHE DTE , SM/13282 New NEW SERVICE CONNECTION FOR PURGUNA PIPED WATER SUPPLY SCHEME. BILL/02830/2023-2024 BP-2023-24-586 04/03/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 6.73 0.00 0 0
3211 PURBA BARDHAMAN Manteswar Central Mechanical GROUND WATER SUPPLY BASED PIPED WATER SUPPLY SCHEME FOR PARGUNA PWSS IN MANTESHWAR BLOCK OF PURBA BARDHAMAN UNDER BURDWAN DIVISION PHE DTE , SM/13282 New New service connection for Parguna PH-2 PWSS. BILL/00088/2024-2025 BP-2024-25-27 19/04/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 7.38 0.00 0 0
3212 PURBA BARDHAMAN Manteswar Burdwan Division GROUND WATER SUPPLY BASED PIPED WATER SUPPLY SCHEME FOR PARGUNA PWSS IN MANTESHWAR BLOCK OF PURBA BARDHAMAN UNDER BURDWAN DIVISION PHE DTE , SM/13282 New Different works related (sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of different capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site) to BELENDA, JAMNA, PIPLON & PARGUNA Piped Water Supply Scheme under Manteswar Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer1, Durgapur Sub-Division, PHE Dte. ORD/000689/2023-2024 4388/BWD 05/10/2023 667 AKASH CONSTRUCTION 2,296.40 0.00 0 50
3213 PURBA BARDHAMAN Manteswar Central Mechanical GROUND WATER SUPPLY BASED PIPED WATER SUPPLY SCHEME FOR PARGUNA PWSS IN MANTESHWAR BLOCK OF PURBA BARDHAMAN UNDER BURDWAN DIVISION PHE DTE , SM/13282 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Sutra & others water supply scheme under Monteswar Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000068/2024-2025 2396/CMD 02/08/2024 455 SINHA ELECTRICALS 78.06 0.00 0 20
3214 PURBA BARDHAMAN Khandaghosh Burdwan Division SARANGA PIPED WATER SUPPLY SCHEME , SM/14078 New Material Requisition To Resource Division RTOR000108/2023-2024 1965/BWD 26/04/2023 Resource Division 7.15 0.00 0 0
3215 PURBA BARDHAMAN Khandaghosh Burdwan Division SARANGA PIPED WATER SUPPLY SCHEME , SM/14078 New Material Requisition To Resource Division RTOR000196/2023-2024 2155/BWD 10/05/2023 Resource Division 5.01 0.00 0 0
3216 PURBA BARDHAMAN Khandaghosh Central Mechanical SARANGA PIPED WATER SUPPLY SCHEME , SM/14078 New New service connection charges for Saranga PWSS TW-2 BILL/00800/2023-2024 BP-2023-24-87 26/07/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 4.97 0.00 0 0
3217 PURBA BARDHAMAN Khandaghosh Central Mechanical SARANGA PIPED WATER SUPPLY SCHEME , SM/14078 New New service connection charges for Saranga PWSS TW-1 BILL/00818/2023-2024 BP-2023-24-94 02/08/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 6.50 0.00 0 0
3218 PURBA BARDHAMAN Khandaghosh Burdwan Division SARANGA PIPED WATER SUPPLY SCHEME , SM/14078 New Material Requisition To Resource Division RTOR000733/2023-2024 5235/BWD 30/11/2023 Resource Division 21.07 0.00 0 0
3219 PURBA BARDHAMAN Khandaghosh Central Mechanical SARANGA PIPED WATER SUPPLY SCHEME , SM/14078 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at Saranga Water Supply Scheme [ Block- Khandoghosh ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER Junior Engineer ORD/000144/2023-2024 2854/CMD 05/07/2023 30 ORIENTAL ENGINEERING CO. 28.97 0.00 0 85
3220 PURBA BARDHAMAN Khandaghosh Central Mechanical SARANGA PIPED WATER SUPPLY SCHEME , SM/14078 New Supply & delivery of submersible pumping machinery (for urgent FHTC) for Tube well no.-1 at Saranga w/s scheme, (Block -Khandaghosh) under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER Junior Engineer ORD/001663/2023-2024 1075/CMSD 15/12/2023 12 SUBHRA ENTERPRISE 0.67 0.00 0 100
3221 PURBA BARDHAMAN Khandaghosh Central Mechanical SARANGA PIPED WATER SUPPLY SCHEME , SM/14078 New Supply & delivery of different electro-mechanical accessories (for urgent FHTC) for Tube well no.-1 at Saranga w/s scheme, ( Block -Khandaghosh) under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER Junior Engineer ORD/001664/2023-2024 1073/CMSD 15/12/2023 10 SUBHRA ENTERPRISE 0.80 0.00 0 100
3222 PURBA BARDHAMAN Khandaghosh Central Mechanical SARANGA PIPED WATER SUPPLY SCHEME , SM/14078 New Emergency Installation (for urgent FHTC) of departmental supply submersible pumping machinery with supply main switch, cable, starter etc. for Tube well no.-1 at Saranga w/s scheme, ( Block -Khandaghosh) under CMD, PHE Dte., Dist.- Purba-Bardhaman ASSISTANT ENGINEER Junior Engineer ORD/001666/2023-2024 06/CMSD 02/01/2024 10 SUBHRA ENTERPRISE 0.72 0.00 0 100
3223 PURBA BARDHAMAN Khandaghosh Central Mechanical SARANGA PIPED WATER SUPPLY SCHEME , SM/14078 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at KHEJURHATI & others water supply scheme under Khandoghosh Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman ASSISTANT ENGINEER Junior Engineer ORD/000071/2024-2025 2391/CMD 02/08/2024 90 C.M. ENTERPRISE 45.81 0.00 0 0
3224 PURBA BARDHAMAN Khandaghosh Central Mechanical SARANGA PIPED WATER SUPPLY SCHEME , SM/14078 New Continuation order-Hiring of Inspection Vehicle (Diesel/CNG/LPG Driven ) for supervision of site for the office of the Assistant Engineer,under CMD,PHE,Dte. [W.e.f-01/03/2024 to 29/04/2024) ASSISTANT ENGINEER Junior Engineer ORD/001914/2023-2024 359/CMSD 27/02/2024 60 SUBRATA BHADRA 0.79 0.79 100 100
3225 PURBA BARDHAMAN Khandaghosh Burdwan Division SARANGA PIPED WATER SUPPLY SCHEME , SM/14078 New Different works related (sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of different capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site) to SARANGA & KAMALPUR Piped Water Supply Scheme under Khandaghosh Block, District:- Purba Bardhaman [NEW SCHEME] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer1, Durgapur Sub-Division, PHE Dte.,Junior Engineer2, Durgapur Sub-Division, PHE Dte. ORD/000082/2023-2024 2078/BWD 04/05/2023 698 KHAN ENTERPRISE 820.73 113.51 13.83 42
3226 PURBA BARDHAMAN Khandaghosh Burdwan Division SARANGA PIPED WATER SUPPLY SCHEME , SM/14078 New Material Requisition To Resource Division RTOR000062/2024-2025 388/BWD 17/01/2025 Resource Division 2.06 0.00 0 0
3227 PURBA BARDHAMAN Khandaghosh Burdwan Division SARANGA PIPED WATER SUPPLY SCHEME , SM/14078 New Balance work for providing Functional Household Tap Connection (FHTC) within command area SARANGA W/S. Scheme of Khandaghosh Block under Burdwan Divn., PHE. Dte. Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer1, Durgapur Sub-Division, PHE Dte. ORD/001097/2024-2025 431/BWD 20/01/2025 120 ANWESHA CONSTRUCTION 98.39 0.00 0 0
3228 PURBA BARDHAMAN Katwa - II Burdwan Division BARA KULGACHHI PIPED WATER SUPPLY SCHEME , SM/14079 New Material Requisition To Resource Division RTOR000089/2023-2024 1962/BWD 25/04/2023 Resource Division 20.38 0.00 0 0
3229 PURBA BARDHAMAN Katwa - II Burdwan Division BARA KULGACHHI PIPED WATER SUPPLY SCHEME , SM/14079 New Material Requisition To Resource Division RTOR000134/2023-2024 2155/BWD 10/05/2023 Resource Division 9.61 0.00 0 0
3230 PURBA BARDHAMAN Katwa - II Central Mechanical BARA KULGACHHI PIPED WATER SUPPLY SCHEME , SM/14079 New New service connection charges for Barakulgachi PWSS TW-2 BILL/00882/2023-2024 BP-2023-24-108 09/08/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 5.73 0.00 0 0
3231 PURBA BARDHAMAN Katwa - II Central Mechanical BARA KULGACHHI PIPED WATER SUPPLY SCHEME , SM/14079 New New service connection charges for Bara Kulgachi PWSS TW-1 BILL/01353/2023-2024 BP-2023-24-131 22/08/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.92 0.00 0 0
3232 PURBA BARDHAMAN Katwa - II Burdwan Division BARA KULGACHHI PIPED WATER SUPPLY SCHEME , SM/14079 New Material Requisition To Resource Division RTOR000792/2023-2024 331/BWD 24/01/2024 Resource Division 16.79 0.00 0 0
3233 PURBA BARDHAMAN Katwa - II Burdwan Division BARA KULGACHHI PIPED WATER SUPPLY SCHEME , SM/14079 New Supply, delivery, installation & hand hold demonstration of different equipments / machineries to test HDPE pipes as per IS: 4984-2016 at the pipe testing laboratory at Nababhat under Burdwan Division, PHE. Dte._2ND CALL AE(HQs) J.E. 1 BURDWAN ORD/001212/2023-2024 907/BWD 04/03/2024 30 MANASH GHOSH 23.87 0.00 0 100
3234 PURBA BARDHAMAN Katwa - II Central Mechanical BARA KULGACHHI PIPED WATER SUPPLY SCHEME , SM/14079 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Mulgram & others water supply scheme under Katwa-II Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. ASSISTANT ENGINEER Junior Engineer ORD/000070/2024-2025 2409/CMD 02/08/2024 90 DUTTA ENTERPRISE 50.18 0.00 0 0
3235 PURBA BARDHAMAN Katwa - II Central Mechanical BARA KULGACHHI PIPED WATER SUPPLY SCHEME , SM/14079 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at BARAKULGACHHI Water Supply Scheme [ Block- KATWA-2] under CMD, PHE Dte., Dist.- Purba-Bardhaman. Driller In-Charge Junior Engineer ORD/000234/2023-2024 3173/CMD 26/07/2023 30 GOENKA ENTERPRISE 28.98 11.35 39.16 90
3236 PURBA BARDHAMAN Katwa - II Burdwan Division BARA KULGACHHI PIPED WATER SUPPLY SCHEME , SM/14079 New BARA KULGACHHI Piped Water Supply Scheme with sinking of Tube-well, LDS, Rising Main, FHTC, Construction of 300 cum capacity RCC OHR with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drain and internal pathway at different TW site under KATWA -II Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer JUNIOR ENGINEER KATWA SUB-DIVISION PHE DTE ORD/000709/2022-2023 775/BWD 24/02/2023 677 MANASH GHOSH 557.58 266.03 47.71 73
3237 PURBA BARDHAMAN Katwa - II Burdwan Division BARA KULGACHHI PIPED WATER SUPPLY SCHEME , SM/14079 New Material Requisition To Resource Division RTOR000093/2024-2025 382/BWD 17/01/2025 Resource Division 5.55 0.00 0 0
3238 PURBA BARDHAMAN Katwa - II Burdwan Division BARA KULGACHHI PIPED WATER SUPPLY SCHEME , SM/14079 New Providing of balance FHTC and other allied works at Barakulgachhi, Chhoto Kulgachhi and Garagachha under the command area of BARAKULGACHI PWSS (SM/14079) in order to declare Sajal Gram, under Katwa-II Block under Katwa Sub-Division, PHE Dte. Assistant Engineer ORD/001316/2024-2025 982/BWD 13/03/2025 21 MANASH GHOSH 9.51 0.00 0 0
3239 PURBA BARDHAMAN Ketugram - I Burdwan Division RAJUR PIPED WATER SUPPLY SCHEME , SM/15238 New Material Requisition To Resource Division RTOR000057/2023-2024 1962/BWD 25/04/2023 Resource Division 16.04 0.00 0 0
3240 PURBA BARDHAMAN Ketugram - I Burdwan Division RAJUR PIPED WATER SUPPLY SCHEME , SM/15238 New Material Requisition To Resource Division RTOR000182/2023-2024 2155/BWD 10/05/2023 Resource Division 10.90 0.00 0 0
3241 PURBA BARDHAMAN Ketugram - I Burdwan Division RAJUR PIPED WATER SUPPLY SCHEME , SM/15238 New Material Requisition To Resource Division RTOR000489/2023-2024 4013/BWD 08/09/2023 Resource Division 15.19 0.00 0 0
3242 PURBA BARDHAMAN Ketugram - I Burdwan Division RAJUR PIPED WATER SUPPLY SCHEME , SM/15238 New Material Requisition To Resource Division RTOR000623/2023-2024 4881/BWD 10/11/2023 Resource Division 29.60 0.00 0 0
3243 PURBA BARDHAMAN Ketugram - I Central Mechanical RAJUR PIPED WATER SUPPLY SCHEME , SM/15238 New New service connection charges for Rajur PWSS TW-1 BILL/01766/2023-2024 BP-2023-24-278 21/12/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.15 0.00 0 0
3244 PURBA BARDHAMAN Ketugram - I Central Mechanical RAJUR PIPED WATER SUPPLY SCHEME , SM/15238 New Quotation for new service connection at RAJUR W/S Scheme PH-II. BILL/01813/2023-2024 BP-2023-24-317 30/12/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.22 0.00 0 0
3245 PURBA BARDHAMAN Ketugram - I Central Mechanical RAJUR PIPED WATER SUPPLY SCHEME , SM/15238 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at RAJUR Water Supply Scheme [ Block- KETUGRAM-1] under CMD, PHE Dte., Dist.- Purba-Bardhaman. Driller In-Charge Junior Engineer ORD/000825/2023-2024 4102/CMD 29/08/2023 30 S DUTTA 28.98 0.00 0 90
3246 PURBA BARDHAMAN Ketugram - I Central Mechanical RAJUR PIPED WATER SUPPLY SCHEME , SM/15238 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Rajur & others water supply scheme under Ketugram-I Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. Driller In-Charge Junior Engineer ORD/000098/2024-2025 2407/CMD 02/08/2024 90 M.S. ENTERPRISE 82.29 0.00 0 0
3247 PURBA BARDHAMAN Ketugram - I Burdwan Division RAJUR PIPED WATER SUPPLY SCHEME , SM/15238 New Balance work for OHR, extension of pipeline to provide FHTC with sinking of tube well, construction of pump house, boundary wall, land development, plinth protection for pump house, approach road & other related work under Chakta, Mahula, Rajoor and Srigram PWSS under Katwa Sub Division, Block- Ketugram-I, Burdwan Division PHE Dte. Assistant Engineer JUNIOR ENGINEER R.W.S. BURDWAN SUB-DIVISION PHE DTE ORD/000284/2024-2025 2721/BWD 11/07/2024 120 ESCON INDIA 139.35 0.00 0 70
3248 PURBA BARDHAMAN Ketugram - I Burdwan Division RAJUR PIPED WATER SUPPLY SCHEME , SM/15238 New RAJUR Piped Water Supply Scheme with sinking of Tube-well, LDS, Rising Main, FHTC, Construction of 350 cum capacity RCC OHR with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drain and internal pathway at different TW site under KETUGRAM-I Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer JUNIOR ENGINEER R.W.S. BURDWAN SUB-DIVISION PHE DTE ORD/000007/2023-2024 1701/BWD 12/04/2023 365 TEKNO ENTERPRISE 471.14 146.65 31.13 77
3249 PURBA BARDHAMAN Ketugram - I Burdwan Division RAJUR PIPED WATER SUPPLY SCHEME , SM/15238 New Material Requisition To Resource Division RTOR000071/2024-2025 397/BWD 17/01/2025 Resource Division 4.36 0.00 0 0
3250 PURBA BARDHAMAN Ketugram - II Burdwan Division PURULIA PIPED WATER SUPPLY SCHEME , SM/15239 New Material Requisition To Resource Division RTOR000162/2023-2024 2155/BWD 10/05/2023 Resource Division 15.02 0.00 0 0
3251 PURBA BARDHAMAN Ketugram - II Burdwan Division PURULIA PIPED WATER SUPPLY SCHEME , SM/15239 New Material Requisition To Resource Division RTOR000490/2023-2024 4014/BWD 08/09/2023 Resource Division 8.73 0.00 0 0
3252 PURBA BARDHAMAN Ketugram - II Burdwan Division PURULIA PIPED WATER SUPPLY SCHEME , SM/15239 New Material Requisition To Resource Division RTOR000597/2023-2024 4891/BWD 10/11/2023 Resource Division 10.00 0.00 0 0
3253 PURBA BARDHAMAN Ketugram - II Central Mechanical PURULIA PIPED WATER SUPPLY SCHEME , SM/15239 New New service connection at Purulia PWSS TW No.1 BILL/02377/2023-2024 BP-2023-24-492 01/02/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.09 0.00 0 0
3254 PURBA BARDHAMAN Ketugram - II Central Mechanical PURULIA PIPED WATER SUPPLY SCHEME , SM/15239 New NEW SERVICE CONNECTION FOR PURULIA PWSS TW 2. BILL/03136/2023-2024 BP-2023-24-650 20/03/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.36 0.00 0 0
3255 PURBA BARDHAMAN Ketugram - II Central Mechanical PURULIA PIPED WATER SUPPLY SCHEME , SM/15239 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Kankurhati & others water supply scheme under Ketugram-2 Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. Driller In-Charge Junior Engineer ORD/000103/2024-2025 2408/CMD 02/08/2024 90 DIPALI CONSTRUCTION 41.95 0.00 0 0
3256 PURBA BARDHAMAN Ketugram - II Burdwan Division PURULIA PIPED WATER SUPPLY SCHEME , SM/15239 New Different works related (sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of different capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site) to BILLESWAR, GURPARA & PURULIA Piped Water Supply Scheme under KETUGRAM-II Block, District:- Purba Bardhaman [NEW SCHEME] Assistant Engineer JUNIOR ENGINEER KATWA SUB-DIVISION PHE DTE,JUNIOR ENGINEER R.W.S. BURDWAN SUB-DIVISION PHE DTE ORD/000038/2023-2024 1821/BWD 18/04/2023 897 PASCON 1,118.33 0.00 0 46
3257 PURBA BARDHAMAN Ketugram - II Central Mechanical PURULIA PIPED WATER SUPPLY SCHEME , SM/15239 New Addl Quotation for new connection at Purulia PWSS(TW-2) BILL/01283/2024-2025 BP-2024-25-424 31/01/2025 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 0.30 0.00 0 null
3258 PURBA BARDHAMAN Ketugram - II Central Mechanical PURULIA PIPED WATER SUPPLY SCHEME , SM/15239 New Supply & Installation of Submersible Pumping Machinery , Voltage Stabilizer, Chlorination System and Internal House wiring for Tube well no.- 1 & 2 at PURULIA Water Supply Scheme [Block - KETUGRAM-2] under CMD, PHE Dte., Dist.- Purba-Bardhaman. Driller In-Charge Junior Engineer ORD/000823/2023-2024 4100/CMD 29/08/2023 610 BARMAN ROY TRADERS 21.01 0.00 0 43
3259 PURBA BARDHAMAN Ketugram - II Central Mechanical PURULIA PIPED WATER SUPPLY SCHEME , SM/15239 New Supply and delivery of 7.5 HP pump motor set at T.W. No - 2 of PURULIA (Block- Ketugram-II) water supply scheme under CMD, PHE Dte. Driller In-Charge JUNIOR ENGINEER ORD/000733/2024-2025 821/DIC/BMSD(D) 05/12/2024 33 BARMAN ROY TRADERS 0.67 0.00 0 100
3260 PURBA BARDHAMAN Ketugram - II Burdwan Division PURULIA PIPED WATER SUPPLY SCHEME , SM/15239 New Balance work of OHR, construction Concrete Road, Drum Sheet Pilling, Functional Household Tap Connection, construction of HUME Pipe culvert, land development, Road restoration etc. under Billeswar PWSS, Purulia PWSS & Gurpara PWSS under KATWA -II Block under Katwa Sub-Divn. under Burdwan Division, PHED. District:- Purba-Bardhaman Assistant Engineer JUNIOR ENGINEER KATWA SUB-DIVISION PHE DTE ORD/000310/2024-2025 2834/BWD 19/07/2024 467 PASCON 190.06 0.00 0 90
3261 PURBA BARDHAMAN Ketugram - I Burdwan Division CHAKDAHA PIPED WATER SUPPLY SCHEME , SM/15582 New Material Requisition To Resource Division RTOR000191/2023-2024 2155/BWD 10/05/2023 Resource Division 4.39 0.00 0 0
3262 PURBA BARDHAMAN Ketugram - I Burdwan Division CHAKDAHA PIPED WATER SUPPLY SCHEME , SM/15582 New Material Requisition To Resource Division RTOR000397/2023-2024 3843/BWD 01/09/2023 Resource Division 1.09 0.00 0 0
3263 PURBA BARDHAMAN Ketugram - I Burdwan Division CHAKDAHA PIPED WATER SUPPLY SCHEME , SM/15582 New Material Requisition To Resource Division RTOR000581/2023-2024 4895/BWD 10/11/2023 Resource Division 4.76 0.00 0 0
3264 PURBA BARDHAMAN Ketugram - I Central Mechanical CHAKDAHA PIPED WATER SUPPLY SCHEME , SM/15582 New New service connection charges for Chakdaha PWSS TW-1 BILL/01765/2023-2024 BP-2023-24-279 21/12/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 4.10 0.00 0 0
3265 PURBA BARDHAMAN Ketugram - I Central Mechanical CHAKDAHA PIPED WATER SUPPLY SCHEME , SM/15582 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Rajur & others water supply scheme under Ketugram-I Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. Driller In-Charge Junior Engineer ORD/000098/2024-2025 2407/CMD 02/08/2024 90 M.S. ENTERPRISE 82.29 0.00 0 0
3266 PURBA BARDHAMAN Ketugram - I Burdwan Division CHAKDAHA PIPED WATER SUPPLY SCHEME , SM/15582 New CHAKDAHA Piped Water Supply Scheme with sinking of Tube-well, LDS, Rising Main, FHTC, Construction of switch rooms & boundary walls with gates and land development, drain and internal pathway at different TW site under KETUGRAM -I Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer JUNIOR ENGINEER R.W.S. BURDWAN SUB-DIVISION PHE DTE ORD/000080/2023-2024 2071/BWD 04/05/2023 120 CHAKRABORTY PROJECTS 85.35 26.08 30.56 76
3267 PURBA BARDHAMAN Ketugram - I Burdwan Division CHAKDAHA PIPED WATER SUPPLY SCHEME , SM/15582 New Balance Work For OHR, Extension Of Pipeline To Provide FHTC With Sinking Of Tube Well, Construction Of Pump House, Boundary Wall, Land Development, Plinth Protection For Pump House, Approach Road & Other Related Work Under Bakalsa, Chakdaha, Ehaipur, Khatundi And Ketugram (Zone-I) Part-A & B PWSS Under Katwa Sub Division, Block- Ketugram-I, Burdwan Division PHE Dte. Assistant Engineer JUNIOR ENGINEER R.W.S. BURDWAN SUB-DIVISION PHE DTE ORD/000288/2024-2025 2741/BWD 12/07/2024 120 M/S M.M. ENTERPRISE 205.15 0.00 0 65
3268 PURBA BARDHAMAN Ketugram - I Central Mechanical CHAKDAHA PIPED WATER SUPPLY SCHEME , SM/15582 New Supply & Installation of Submersible Pumping Machinery , Voltage Stabilizer, Chlorination system and internal House wiring for Tube well no.- 1 & 2 at CHAKDAHA [KETUGRAM-I] Water Supply Scheme under CMD, PHE Dte., Dist.- Purba-Bardhaman. Driller In-Charge Junior Engineer ORD/000890/2023-2024 4153/CMD 29/08/2023 640 AMUSAR IMPEX PVT. LTD. 21.26 9.69 45.58 47
3269 PURBA BARDHAMAN Central Mechanical AUGMENTATION OF SRIKHANDA PIPED WATER SUPPLY SCHEME , SM/15557 Augmentation QUOTATION FOR NEW SERVICE CONNECTION AT AUGMENTATION OF SRIKHANDA PWSS TW 2 BILL/00365/2024-2025 BP-2024-25-188 08/07/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 4.98 0.00 0 0
3270 PURBA BARDHAMAN Central Mechanical AUGMENTATION OF SRIKHANDA PIPED WATER SUPPLY SCHEME , SM/15557 Augmentation Quotation for new service connection at Augmentation of Srikhanda PWSS, PH-1. BILL/00464/2024-2025 BP-2024-25-249 01/08/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.73 0.00 0 0
3271 PURBA BARDHAMAN Central Mechanical AUGMENTATION OF SRIKHANDA PIPED WATER SUPPLY SCHEME , SM/15557 Augmentation Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.- 2 at Augumentation of Srikhanda Water Supply Scheme [ BLOCK- Katwa-I ]under CMD, PHE Dte., Dist.- Purba-Bardhaman. Driller In-Charge Junior Engineer ORD/001644/2023-2024 1626/CMD 15/03/2024 30 D.K. ELECTRIC 11.62 0.00 0 88
3272 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF SRIKHANDA PIPED WATER SUPPLY SCHEME , SM/15557 Augmentation Augmentation of SRIKHANDA Piped Water Supply Scheme with sinking of Tube-well, LDS, Rising Main, FHTC, Construction of 450 cum capacity RCC OHR with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drain and internal pathway at different TW site under KATWA-II Block, District:- Purba-Bardhaman. Assistant Engineer JUNIOR ENGINEER KATWA SUB-DIVISION PHE DTE ORD/000489/2023-2024 3508/BWD 10/08/2023 365 GUPTA ENTERPRISE 656.48 71.73 10.93 18
3273 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF SRIKHANDA PIPED WATER SUPPLY SCHEME , SM/15557 Augmentation Balance work of OHR, construction Concrete Road, Functional Household Tap Connection, Road restoration etc. for Nanagar PWSS, Srikhanda PWSS, under KATWA -I Block under Katwa Sub-Divn under Burdwan Division, PHE Dte. District:- Purba-Bardhaman. Assistant Engineer ORD/000685/2024-2025 3655/BWD 21/10/2024 120 HAMID SK 121.69 0.00 0 0
3274 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF SRIKHANDA PIPED WATER SUPPLY SCHEME , SM/15557 Augmentation Construction of Pump House, Boundary walls and Raising Main for Aug. of SRIKHANDA Piped Water Supply Scheme under Katwa-I Block, District:- Purba-Bardhaman. Assistant Engineer JUNIOR ENGINEER KATWA SUB-DIVISION PHE DTE ORD/000924/2023-2024 5486/BWD 13/12/2023 391 BABUL SK 9.77 0.00 0 75
3275 PURBA BARDHAMAN Central Mechanical AUGMENTATION OF SRIKHANDA PIPED WATER SUPPLY SCHEME , SM/15557 Augmentation Supply & Installation of Submersible Pumping Machinery , Voltage Stabilizer, Chlorination system and internal House wiring for Tube well no.- 1 at Augumentation of Srikhanda Water Supply Scheme under CMD, PHE Dte., Dist.- Purba-Bardhaman. Driller In-Charge Junior Engineer ORD/000087/2023-2024 2582/CMD 07/06/2023 580 AMUSAR IMPEX PVT. LTD. 11.25 0.00 0 95
3276 PURBA BARDHAMAN Raina - I Burdwan Division UDGARA PIPED WATER SUPPLY SCHEME , SM/14961 New Material Requisition To Resource Division RTOR000207/2023-2024 2155/BWD 10/05/2023 Resource Division 9.24 0.00 0 0
3277 PURBA BARDHAMAN Raina - I Burdwan Division UDGARA PIPED WATER SUPPLY SCHEME , SM/14961 New Material Requisition To Resource Division RTOR000535/2023-2024 4287/BWD 29/09/2023 Resource Division 4.57 0.00 0 0
3278 PURBA BARDHAMAN Raina - I Central Mechanical UDGARA PIPED WATER SUPPLY SCHEME , SM/14961 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at Udgara Water Supply Scheme [ Block- Raina-1 ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000712/2023-2024 4023/CMD 29/08/2023 30 CHATTERJEE ENTERPRISE 28.95 0.00 0 0
3279 PURBA BARDHAMAN Raina - I Burdwan Division UDGARA PIPED WATER SUPPLY SCHEME , SM/14961 New Material Requisition To Resource Division RTOR000699/2023-2024 5069/BWD 23/11/2023 Resource Division 20.46 0.00 0 0
3280 PURBA BARDHAMAN Raina - I Central Mechanical UDGARA PIPED WATER SUPPLY SCHEME , SM/14961 New New Service connection for Udgram W/S Scheme PH No.-II BILL/01798/2023-2024 BP-2023-24-311 30/12/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.73 0.00 0 0
3281 PURBA BARDHAMAN Raina - I Central Mechanical UDGARA PIPED WATER SUPPLY SCHEME , SM/14961 New New Service connection for Udgra W/S Scheme PH No.-I BILL/01799/2023-2024 BP-2023-24-310 30/12/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.13 0.00 0 0
3282 PURBA BARDHAMAN Raina - I Central Mechanical UDGARA PIPED WATER SUPPLY SCHEME , SM/14961 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Bajitpur, Belsar & other water supply scheme under Raina-1 Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000117/2024-2025 2589/CMD 27/08/2024 90 DEY ENTERPRISE 74.58 0.00 0 0
3283 PURBA BARDHAMAN Raina - I Burdwan Division UDGARA PIPED WATER SUPPLY SCHEME , SM/14961 New Different works related (sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of different capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site) to BHAGABATIPUR, MACHKHARA & UDGARA Piped Water Supply Scheme under Raina ¿ I Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000690/2023-2024 4386/BWD 05/10/2023 365 SK ALIM 1,378.97 0.00 0 55
3284 PURBA BARDHAMAN Raina - I Burdwan Division UDGARA PIPED WATER SUPPLY SCHEME , SM/14961 New Continuation Work Order for supply of inspection Vehicle for inspection of different JJM related (schemes)works as and when required including supply of driver & fuel(minimum 8 hours duty per day) and all taxes etc. for Burdwan Sub-Division under Burdwan Division,PHE Dte consider 96.00 Km. run per day (Period from 01-11-2024 to 31-01-2025) JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000896/2024-2025 2438/BSD 29/10/2024 66 PARVIN BEGAM 0.85 0.00 0 0
3285 PURBA BARDHAMAN Raina - I Burdwan Division UDGARA PIPED WATER SUPPLY SCHEME , SM/14961 New Balance work [i.e. Extension or parallel Pipeline, Leftout FHTC, Road Restoration work, Sinking of Additional Tube Well with Pump House & Boundary wall, inter Connection of Additional Tube Well, Construction of M.S.Structural bridge, canal Crossing, MS casing with allied work of Bhagabatipur, Machkhara, Udgara, Bantir, Chakpurohit Rasuikhanda, Sankarpur, Gopalpur & Belshar PWSS Block-RAINA- I under Burdwan Sub Division, PHE Dte. within Burdwan Division PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/001103/2024-2025 469/BWD 24/01/2025 180 SK ALIM 1,353.91 0.00 0 0
3286 PURBA BARDHAMAN Bhatar Burdwan Division BAZAR MAHAMMADPUR PIPED WATER SUPPLY SCHEME , SM/14962 New Material Requisition To Resource Division RTOR000064/2023-2024 1962/BWD 25/04/2023 Resource Division 32.63 0.00 0 0
3287 PURBA BARDHAMAN Bhatar Burdwan Division BAZAR MAHAMMADPUR PIPED WATER SUPPLY SCHEME , SM/14962 New Material Requisition To Resource Division RTOR000172/2023-2024 2155/BWD 10/05/2023 Resource Division 4.84 0.00 0 0
3288 PURBA BARDHAMAN Bhatar Central Mechanical BAZAR MAHAMMADPUR PIPED WATER SUPPLY SCHEME , SM/14962 New New service connection charges for Bazar Mahammadpur PWSS TW-1 BILL/00883/2023-2024 BP-2023-24-109 09/08/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.85 0.00 0 0
3289 PURBA BARDHAMAN Bhatar Burdwan Division BAZAR MAHAMMADPUR PIPED WATER SUPPLY SCHEME , SM/14962 New Material Requisition To Resource Division RTOR000601/2023-2024 4907/BWD 10/11/2023 Resource Division 33.07 0.00 0 0
3290 PURBA BARDHAMAN Bhatar Central Mechanical BAZAR MAHAMMADPUR PIPED WATER SUPPLY SCHEME , SM/14962 New New service connection charges for Bazar Mohammadpur PWSS TW-2 BILL/01734/2023-2024 BP-2023-24-250 07/12/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 4.98 0.00 0 0
3291 PURBA BARDHAMAN Bhatar Central Mechanical BAZAR MAHAMMADPUR PIPED WATER SUPPLY SCHEME , SM/14962 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Karjana & others water supply scheme under Bhatar Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000067/2024-2025 2394/CMD 02/08/2024 90 AHALYA ENGINEERING WORKS 82.00 0.00 0 0
3292 PURBA BARDHAMAN Bhatar Central Mechanical BAZAR MAHAMMADPUR PIPED WATER SUPPLY SCHEME , SM/14962 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at BAZAR MAHAMMADPUR Water Supply Scheme [ Block- BHATAR] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000235/2023-2024 3171/CMD 26/07/2023 30 SUNRISE ENGINEERING CORPORATION 27.78 0.00 0 95
3293 PURBA BARDHAMAN Bhatar Burdwan Division BAZAR MAHAMMADPUR PIPED WATER SUPPLY SCHEME , SM/14962 New Material Requisition To Resource Division RTOR000070/2024-2025 396/BWD 17/01/2025 Resource Division 8.25 0.00 0 0
3294 PURBA BARDHAMAN Bhatar Central Mechanical BAZAR MAHAMMADPUR PIPED WATER SUPPLY SCHEME , SM/14962 New Supply and installation of Electro-Magnetic flow meter at Bazar Mahammadpur, Dhatrigram, Arjunpukur & others water supply scheme under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000590/2024-2025 3105/CMD 11/12/2024 60 SHREE BISHNU CONSTRUCTION 19.77 0.00 0 0
3295 PURBA BARDHAMAN Bhatar Burdwan Division BAZAR MAHAMMADPUR PIPED WATER SUPPLY SCHEME , SM/14962 New BAZAR MAHAMMADPUR Piped Water Supply Scheme with sinking of Tube-well, LDS, Rising Main, FHTC, Construction of 400 cum capacity RCC OHR with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drain and internal pathway at different TW site under Bhatar Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer2, Durgapur Sub-Division, PHE Dte. ORD/000801/2022-2023 1529/BWD 29/03/2023 659 ASHOK MITRA 537.95 207.35 38.54 30
3296 PURBA BARDHAMAN Ausgram - II Burdwan Division CHHOTO RAMCHANDRAPUR PIPED WATER SUPPLY SCHEME , SM/14926 New Material Requisition To Resource Division RTOR000051/2023-2024 1962/BWD 25/04/2023 Resource Division 0.33 0.00 0 0
3297 PURBA BARDHAMAN Ausgram - II Burdwan Division CHHOTO RAMCHANDRAPUR PIPED WATER SUPPLY SCHEME , SM/14926 New Material Requisition To Resource Division RTOR000308/2023-2024 2197/BWD 12/05/2023 Resource Division 5.69 0.00 0 0
3298 PURBA BARDHAMAN Ausgram - II Central Mechanical CHHOTO RAMCHANDRAPUR PIPED WATER SUPPLY SCHEME , SM/14926 New New service connection charges for Chhoto Ramchandrapur PWSS TW-1 BILL/01486/2023-2024 BP-2023-24-180 04/10/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 2.92 0.00 0 0
3299 PURBA BARDHAMAN Ausgram - II Burdwan Division CHHOTO RAMCHANDRAPUR PIPED WATER SUPPLY SCHEME , SM/14926 New Material Requisition To Resource Division RTOR000755/2023-2024 5244/BWD 30/11/2023 Resource Division 18.50 0.00 0 0
3300 PURBA BARDHAMAN Ausgram - II Central Mechanical CHHOTO RAMCHANDRAPUR PIPED WATER SUPPLY SCHEME , SM/14926 New New service connection for Choto Ramchandrapur W/S scheme TW No-2 BILL/02276/2023-2024 BP-2023-24-413 19/01/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 4.94 0.00 0 0
3301 PURBA BARDHAMAN Ausgram - II Central Mechanical CHHOTO RAMCHANDRAPUR PIPED WATER SUPPLY SCHEME , SM/14926 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Chora, Kalaijhuti & others water supply scheme under Ausgram-2 Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. Driller In-Charge JUNIOR ENGINEER ORD/000143/2024-2025 2405/CMD 02/08/2024 90 NABAUDYOG ELECTRICAL ENGINEERING CO-OPERATIVE SOCIETY LTD 95.26 0.00 0 0
3302 PURBA BARDHAMAN Ausgram - II Durgapur W/S Division CHHOTO RAMCHANDRAPUR PIPED WATER SUPPLY SCHEME , SM/14926 New Material Requisition To Resource Division RTOR000012/2024-2025 1724/G/DWSD 10/12/2024 Resource Division 3.99 0.00 0 0
3303 PURBA BARDHAMAN Ausgram - II Burdwan Division CHHOTO RAMCHANDRAPUR PIPED WATER SUPPLY SCHEME , SM/14926 New CHOTO RAMCHANDRAPUR Piped Water Supply Scheme with sinking of Tube-well, LDS, Rising Main, FHTC & construction of switch rooms & boundary walls with gates and land development, drain and internal pathway at different TW site under Aushgram-II Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer ORD/000377/2023-2024 3116/BWD 19/07/2023 240 KALPANA BUILDERS 150.39 30.80 20.48 38
3304 PURBA BARDHAMAN Ausgram - II Central Mechanical CHHOTO RAMCHANDRAPUR PIPED WATER SUPPLY SCHEME , SM/14926 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at Chhoto Ramchandrapur Water Supply Scheme [ Block- Ausgram-2 ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. Driller In-Charge JUNIOR ENGINEER ORD/000688/2023-2024 4015/CMD 29/08/2023 580 JAL PRAVAHIKA PVT LTD 27.77 0.00 0 48
3305 PURBA BARDHAMAN Ausgram - II Durgapur W/S Division CHHOTO RAMCHANDRAPUR PIPED WATER SUPPLY SCHEME , SM/14926 New Acceptance cum Formal Work Order for Balance works related sinking of Tube-wells at ARJURI village,PH,BW, LDS , Rising Mains, FHTCs,Road Restoration ,Land Development Etc. Construction of CHOTORAMCHANDRAPUR Piped Water Supply Scheme under Aushgram-II Block, of Durgapur Water supply Division, PHE Dte. Assistant Engineer-I Contractual Junior Engineer_3 ORD/000188/2024-2025 1610/DWSD 26/11/2024 180 KALPANA BUILDERS 78.66 0.00 0 0
3306 PURBA BARDHAMAN Ausgram - II Durgapur W/S Division CHHOTO RAMCHANDRAPUR PIPED WATER SUPPLY SCHEME , SM/14926 New Material Requisition To Resource Division RTOR000062/2024-2025 482/DWSD 17/03/2025 Resource Division 0.14 0.00 0 0
3307 PURBA BARDHAMAN Mangolkote Burdwan Division PASCHIM NABAGRAM PIPED WATER SUPPLY SCHEME , SM/14964 New Material Requisition To Resource Division RTOR000366/2023-2024 2197/BWD 12/05/2023 Resource Division 16.26 0.00 0 0
3308 PURBA BARDHAMAN Mangolkote Burdwan Division PASCHIM NABAGRAM PIPED WATER SUPPLY SCHEME , SM/14964 New Material Requisition To Resource Division RTOR000499/2023-2024 4023/BWD 08/09/2023 Resource Division 5.83 0.00 0 0
3309 PURBA BARDHAMAN Mangolkote Burdwan Division PASCHIM NABAGRAM PIPED WATER SUPPLY SCHEME , SM/14964 New Material Requisition To Resource Division RTOR000686/2023-2024 5079/BWD 23/11/2023 Resource Division 19.78 0.00 0 0
3310 PURBA BARDHAMAN Mangolkote Central Mechanical PASCHIM NABAGRAM PIPED WATER SUPPLY SCHEME , SM/14964 New NEW SERVICE CONNECTION FOR PASCHIM NABAGRAM PWSS PH-1 BILL/00190/2024-2025 BP-2024-25-85 15/05/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 5.06 0.00 0 0
3311 PURBA BARDHAMAN Mangolkote Central Mechanical PASCHIM NABAGRAM PIPED WATER SUPPLY SCHEME , SM/14964 New NEW SERVICE CONNECTION FOR PASCHIM NABAGRAM PWSS PH-2 BILL/00189/2024-2025 BP-2024-25-86 15/05/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 6.13 0.00 0 0
3312 PURBA BARDHAMAN Mangolkote Central Mechanical PASCHIM NABAGRAM PIPED WATER SUPPLY SCHEME , SM/14964 New Additional Quotation for service connection at Paschim Nabagram PWSS PH-2. BILL/00419/2024-2025 BP-2024-25-220 26/07/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 12.00 0.00 0 0
3313 PURBA BARDHAMAN Mangolkote Central Mechanical PASCHIM NABAGRAM PIPED WATER SUPPLY SCHEME , SM/14964 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at PASCHIM NABAGRAM Water Supply Scheme [ Block- MONGOLKOTE] under CMD, PHE Dte., Dist.- Purba-Bardhaman. Driller In-Charge Junior Engineer ORD/000926/2023-2024 4189/CMD 29/08/2023 30 M/S. S.R. ENTERPRISE 29.91 0.00 0 43
3314 PURBA BARDHAMAN Mangolkote Central Mechanical PASCHIM NABAGRAM PIPED WATER SUPPLY SCHEME , SM/14964 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Lakshimpur & others water supply scheme under Mangalkote Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman Driller In-Charge Junior Engineer ORD/000097/2024-2025 2406/CMD 02/08/2024 290 CHOUDHURY ENTERPRISE 57.65 0.00 0 10
3315 PURBA BARDHAMAN Mangolkote Burdwan Division PASCHIM NABAGRAM PIPED WATER SUPPLY SCHEME , SM/14964 New PASCHIM NABAGRAM Piped Water Supply Scheme with sinking of Tube-well, LDS, Rising Main, FHTC, Construction of 250 cum capacity RCC OHR with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drain and internal pathway at different TW site under Mongalkote Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer Junior Engineer ,JUNIOR ENGINEER KATWA SUB-DIVISION PHE DTE ORD/000177/2023-2024 3069/BWD 18/07/2023 683 SRI RAM CONSTRUCTION 473.94 31.61 6.67 25
3316 PURBA BARDHAMAN Ketugram - II Central Mechanical CHARKHI PIPED WATER SUPPLY SCHEME , SM/14966 New New service connection charges for Charkhi PWSS TW-2 BILL/00880/2023-2024 BP-2023-24-110 09/08/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 4.25 0.00 0 0
3317 PURBA BARDHAMAN Ketugram - II Burdwan Division CHARKHI PIPED WATER SUPPLY SCHEME , SM/14966 New Material Requisition To Resource Division RTOR000488/2023-2024 4012/BWD 08/09/2023 Resource Division 0.69 0.00 0 0
3318 PURBA BARDHAMAN Ketugram - II Burdwan Division CHARKHI PIPED WATER SUPPLY SCHEME , SM/14966 New Material Requisition To Resource Division RTOR000622/2023-2024 4880/BWD 10/11/2023 Resource Division 29.60 0.00 0 0
3319 PURBA BARDHAMAN Ketugram - II Central Mechanical CHARKHI PIPED WATER SUPPLY SCHEME , SM/14966 New Quotation for new electric service connection at Charki PWSS TW No-1 BILL/01744/2023-2024 BP-2023-24-251 07/12/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 5.27 0.00 0 0
3320 PURBA BARDHAMAN Ketugram - II Burdwan Division CHARKHI PIPED WATER SUPPLY SCHEME , SM/14966 New Material Requisition To Resource Division RTOR000770/2023-2024 194/BWD 10/01/2024 Resource Division 9.75 0.00 0 0
3321 PURBA BARDHAMAN Ketugram - II Central Mechanical CHARKHI PIPED WATER SUPPLY SCHEME , SM/14966 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at CHARKHI Water Supply Scheme [ Block- KETUGRAM-2 ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. Driller In-Charge Junior Engineer ORD/000391/2023-2024 3663/CMD 01/08/2023 30 AHALYA ENGINEERING WORKS 27.78 0.00 0 48
3322 PURBA BARDHAMAN Ketugram - II Central Mechanical CHARKHI PIPED WATER SUPPLY SCHEME , SM/14966 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Kankurhati & others water supply scheme under Ketugram-2 Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. Driller In-Charge Junior Engineer ORD/000103/2024-2025 2408/CMD 02/08/2024 90 DIPALI CONSTRUCTION 41.95 0.00 0 0
3323 PURBA BARDHAMAN Ketugram - II Burdwan Division CHARKHI PIPED WATER SUPPLY SCHEME , SM/14966 New Different works related (sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of different capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site) to CHARKHI & SHIBNUL Piped Water Supply Scheme under KETUGRAM-II Block, District:- Purba Bardhaman [NEW SCHEME] Assistant Engineer JUNIOR ENGINEER KATWA SUB-DIVISION PHE DTE,JUNIOR ENGINEER R.W.S. BURDWAN SUB-DIVISION PHE DTE ORD/000049/2023-2024 1823/BWD 18/04/2023 928 PASCON 723.75 68.47 9.46 35
3324 PURBA BARDHAMAN Ketugram - II Burdwan Division CHARKHI PIPED WATER SUPPLY SCHEME , SM/14966 New Balance work for OHR, extension of pipeline to provide FHTC with land development, plinth protection for pump house & OHR under Charkhi PWSS, Block-Ketugram-II under Katwa Sub Division within Burdwan Division PHE Dte. Assistant Engineer JUNIOR ENGINEER KATWA SUB-DIVISION PHE DTE ORD/000312/2024-2025 2836/BWD 19/07/2024 470 PASCON 74.08 0.00 0 90
3325 PURBA BARDHAMAN Mangolkote Burdwan Division MAHARUTBA PIPED WATER SUPPLY SCHEME , SM/14970 New Material Requisition To Resource Division RTOR000115/2023-2024 1965/BWD 26/04/2023 Resource Division 2.48 0.00 0 0
3326 PURBA BARDHAMAN Mangolkote Burdwan Division MAHARUTBA PIPED WATER SUPPLY SCHEME , SM/14970 New Material Requisition To Resource Division RTOR000336/2023-2024 2197/BWD 12/05/2023 Resource Division 1.47 0.00 0 0
3327 PURBA BARDHAMAN Mangolkote Central Mechanical MAHARUTBA PIPED WATER SUPPLY SCHEME , SM/14970 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at Maharutba Water Supply Scheme [ Block- MONGOLKOTE] under CMD, PHE Dte., Dist.- Purba-Bardhaman. Driller In-Charge Junior Engineer ORD/000775/2023-2024 4069/CMD 29/08/2023 30 GLACIER ENGINEERING CO 26.98 0.00 0 0
3328 PURBA BARDHAMAN Mangolkote Burdwan Division MAHARUTBA PIPED WATER SUPPLY SCHEME , SM/14970 New Material Requisition To Resource Division RTOR000815/2023-2024 296/BWD 24/01/2024 Resource Division 20.47 0.00 0 0
3329 PURBA BARDHAMAN Mangolkote Central Mechanical MAHARUTBA PIPED WATER SUPPLY SCHEME , SM/14970 New NEW SERVICE CONNECTION FOR MAHARTUBA PWSS. BILL/02860/2023-2024 BP-2023-24-610 06/03/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 5.94 0.00 0 0
3330 PURBA BARDHAMAN Mangolkote Central Mechanical MAHARUTBA PIPED WATER SUPPLY SCHEME , SM/14970 New Quotation for new service connection at Mahartuba PWSS PH-1 BILL/00385/2024-2025 BP-2024-25-206 18/07/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 7.00 0.00 0 0
3331 PURBA BARDHAMAN Mangolkote Burdwan Division MAHARUTBA PIPED WATER SUPPLY SCHEME , SM/14970 New Different works related (sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of different capacity RCC OHRs each with 20.0mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site) to BHATPARA & MAHARUTBA Piped Water Supply Scheme under Mangolkote Block, District:-Purba-Bardhaman [NEW SCHEME] Assistant Engineer J.E. katwa,Junior Engineer ORD/000429/2023-2024 3328/BWD 02/08/2023 365 KAMIRUL SK & CO. 815.64 51.62 6.33 10
3332 PURBA BARDHAMAN Mangolkote Central Drilling MAHARUTBA PIPED WATER SUPPLY SCHEME , SM/14970 New Providing drilling crew and other allied works for construction of Tube Well (250mm X150mm X 240 Mtrs. Depth) by utilising Departmental Machineries for MAHARUTBA W/S Scheme (T/W-I), Mongalkote Block under Purba Bardhaman District, Central Drilling Division, P.H.E. Dte. Assistant Engineer Junior Engineer ORD/000157/2023-2024 1819/CDD 07/12/2023 30 M/S PRACHI ENGINEERING 13.67 0.00 0 100
3333 PURBA BARDHAMAN Mangolkote Central Drilling MAHARUTBA PIPED WATER SUPPLY SCHEME , SM/14970 New Providing drilling crew and other allied works for construction of Tube Well (250mm X150mm X 240 Mtrs. Depth) by utilizing Departmental Machineries for MAHARUTBA W/S Scheme (T/W-II) Block- Mangolkote under Purba Bardhman District, Central Drilling Division, P.H.E. Dte. Assistant Engineer Junior Engineer ORD/000158/2023-2024 1338/CDD 13/09/2023 30 C.M. ENTERPRISE 11.46 0.00 0 100
3334 PURBA BARDHAMAN Mangolkote Burdwan Division MAHARUTBA PIPED WATER SUPPLY SCHEME , SM/14970 New Material Requisition To Resource Division RTOR000072/2024-2025 398/BWD 17/01/2025 Resource Division 8.20 0.00 0 0
3335 PURBA BARDHAMAN Mangolkote Central Mechanical MAHARUTBA PIPED WATER SUPPLY SCHEME , SM/14970 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Lakshimpur & others water supply scheme under Mangalkote Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman Driller In-Charge Junior Engineer ORD/000097/2024-2025 2406/CMD 02/08/2024 290 CHOUDHURY ENTERPRISE 57.65 0.00 0 10
3336 PURBA BARDHAMAN Mangolkote Central Mechanical MAHARUTBA PIPED WATER SUPPLY SCHEME , SM/14970 New Additional quotation in second time for Mahartuba T W 1 BILL/01365/2024-2025 BP-2024-25-433 31/01/2025 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 2.38 0.00 0 null
3337 PURBA BARDHAMAN Mangolkote Burdwan Division MAHARUTBA PIPED WATER SUPPLY SCHEME , SM/14970 New Balance work of MAHARTUTBA Piped Water Supply Scheme with sinking of Tube-well, LDS, FHTC & construction of switch rooms & boundary walls with gates and land development, drain and internal pathway at different TW site under Mongalkote Block, District:- Purba-Bardhaman Assistant Engineer ORD/001212/2024-2025 722/BWD 24/02/2025 120 KAMIRUL SK & CO. 147.19 0.00 0 0
3338 PURBA BARDHAMAN Burdwan - I Burdwan Division BAHIR SARBAMANGALA-A PIPE WATER SUPPLY SCHEME , SM/14976 New Material Requisition To Resource Division RTOR000203/2023-2024 2155/BWD 10/05/2023 Resource Division 11.50 0.00 0 0
3339 PURBA BARDHAMAN Burdwan - I Burdwan Division BAHIR SARBAMANGALA-A PIPE WATER SUPPLY SCHEME , SM/14976 New Material Requisition To Resource Division RTOR000507/2023-2024 4031/BWD 08/09/2023 Resource Division 3.08 0.00 0 0
3340 PURBA BARDHAMAN Burdwan - I Burdwan Division BAHIR SARBAMANGALA-A PIPE WATER SUPPLY SCHEME , SM/14976 New Material Requisition To Resource Division RTOR000645/2023-2024 5094/BWD 23/11/2023 Resource Division 20.46 0.00 0 0
3341 PURBA BARDHAMAN Burdwan - I Central Mechanical BAHIR SARBAMANGALA-A PIPE WATER SUPPLY SCHEME , SM/14976 New New Service connection for Bahir Sarbamangala (Part-A) PWSS TW-1. BILL/02895/2023-2024 BP-2023-24-624 07/03/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 7.85 0.00 0 0
3342 PURBA BARDHAMAN Burdwan - I Central Mechanical BAHIR SARBAMANGALA-A PIPE WATER SUPPLY SCHEME , SM/14976 New New Service connection for Bahir Sarbamangala (Part-A) PWSS TW-2. BILL/02896/2023-2024 BP-2023-24-625 07/03/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 4.52 0.00 0 0
3343 PURBA BARDHAMAN Burdwan - I Central Mechanical BAHIR SARBAMANGALA-A PIPE WATER SUPPLY SCHEME , SM/14976 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at MALKITA & others water supply scheme under Bardhaman-I Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman ASSISTANT ENGINEER Junior Engineer ORD/000066/2024-2025 2388/CMD 02/08/2024 90 ELECTRICAL & MECHANICAL ENGINEERING CORPORATION 55.95 0.00 0 0
3344 PURBA BARDHAMAN Burdwan - I Burdwan Division BAHIR SARBAMANGALA-A PIPE WATER SUPPLY SCHEME , SM/14976 New BAHIRSARBAMANGALA-A Piped Water Supply Scheme with sinking of Tube-well, LDS, Rising Main, FHTC, Construction of 300 cum capacity RCC OHR with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drain and internal pathway at different TW site under Burdwan-I Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000106/2023-2024 2297/BWD 19/05/2023 365 MLG CONSTRUCTION 371.05 0.00 0 30
3345 PURBA BARDHAMAN Burdwan - I Burdwan Division BAHIR SARBAMANGALA-A PIPE WATER SUPPLY SCHEME , SM/14976 New Material Requisition To Resource Division RTOR000081/2024-2025 407/BWD 17/01/2025 Resource Division 0.33 0.00 0 0
3346 PURBA BARDHAMAN Burdwan - I Central Mechanical BAHIR SARBAMANGALA-A PIPE WATER SUPPLY SCHEME , SM/14976 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at Bahir Sarbamangala-A Water Supply Scheme [ Block- Burdwan-1 ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER Junior Engineer ORD/001050/2023-2024 4045/CMD 29/08/2023 672 P.K. ENGINEERING 29.35 0.00 0 45
3347 PURBA BARDHAMAN Burdwan - I Burdwan Division HALDI PIPED WATER SUPPLY SINGLE VILLAGE SCHEME , SM/14906 New Material Requisition To Resource Division RTOR000001/2023-2024 1962/BWD 25/04/2023 Resource Division 4.69 0.00 0 0
3348 PURBA BARDHAMAN Burdwan - I Burdwan Division HALDI PIPED WATER SUPPLY SINGLE VILLAGE SCHEME , SM/14906 New Material Requisition To Resource Division RTOR000272/2023-2024 2197/BWD 12/05/2023 Resource Division 4.03 0.00 0 0
3349 PURBA BARDHAMAN Burdwan - I Burdwan Division HALDI PIPED WATER SUPPLY SINGLE VILLAGE SCHEME , SM/14906 New Material Requisition To Resource Division RTOR000790/2023-2024 332/BWD 24/01/2024 Resource Division 21.17 0.00 0 0
3350 PURBA BARDHAMAN Burdwan - I Central Mechanical HALDI PIPED WATER SUPPLY SINGLE VILLAGE SCHEME , SM/14906 New New service connection for HALDI PWSS TW 1. BILL/02444/2023-2024 BP-2023-24-523 09/02/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 5.00 0.00 0 0
3351 PURBA BARDHAMAN Burdwan - I Central Mechanical HALDI PIPED WATER SUPPLY SINGLE VILLAGE SCHEME , SM/14906 New NEW SERVICE CONNECTION FOR HALDI PWSS BILL/02835/2023-2024 BP-2023-24-591 04/03/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 8.50 0.00 0 0
3352 PURBA BARDHAMAN Burdwan - I Burdwan Division HALDI PIPED WATER SUPPLY SINGLE VILLAGE SCHEME , SM/14906 New Land demarcation and preparation of sketch map for Haldi, Sultanpur, Berugram & Karail Piped W/S. Scheme (New Scheme) at different Blocks under JJM under Burdwan Division, PHE Dte. AE(HQs) J.E. 1 BURDWAN ORD/000756/2023-2024 842/AE/HQ 01/11/2023 15 M/S S. CHOUDHURY 0.33 0.00 0 100
3353 PURBA BARDHAMAN Burdwan - I Central Mechanical HALDI PIPED WATER SUPPLY SINGLE VILLAGE SCHEME , SM/14906 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at MALKITA & others water supply scheme under Bardhaman-I Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman ASSISTANT ENGINEER Junior Engineer ORD/000066/2024-2025 2388/CMD 02/08/2024 90 ELECTRICAL & MECHANICAL ENGINEERING CORPORATION 55.95 0.00 0 0
3354 PURBA BARDHAMAN Burdwan - I Central Mechanical HALDI PIPED WATER SUPPLY SINGLE VILLAGE SCHEME , SM/14906 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at Haldi Water Supply Scheme [ Block- Burdwan-1 ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER Junior Engineer ORD/000653/2023-2024 3996/CMD 29/08/2023 30 C.M. ENTERPRISE 28.90 22.74 78.69 95
3355 PURBA BARDHAMAN Burdwan - I Burdwan Division HALDI PIPED WATER SUPPLY SINGLE VILLAGE SCHEME , SM/14906 New HALDI Single Village Scheme with sinking of Tube-well & construction of switch rooms & boundary walls with gates and land development, drain and internal pathway at different TW site under Burdwan-I Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JE (RWS) Burdwan-I Block ORD/000759/2023-2024 4734/BWD 03/11/2023 456 ANIRUDDHA FARUQUE 50.21 0.00 0 90
3356 PURBA BARDHAMAN Burdwan - I Burdwan Division HALDI PIPED WATER SUPPLY SINGLE VILLAGE SCHEME , SM/14906 New HALDI Single Village Scheme with Rising main, LDS and FHTC work under Burdwan-I Block, District:- Purba-Bardhaman [NEW SCHEME]. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JE (RWS) Burdwan-I Block ORD/001090/2023-2024 1120/BWD 14/03/2024 382 ANIRUDDHA FARUQUE 64.85 15.05 23.21 75
3357 PURBA BARDHAMAN Bhatar Burdwan Division RAMCHANDRAPUR PIPED WATER SUPPLY SCHEME , SM/14909 New Material Requisition To Resource Division RTOR000085/2023-2024 1962/BWD 25/04/2023 Resource Division 6.74 0.00 0 0
3358 PURBA BARDHAMAN Bhatar Burdwan Division RAMCHANDRAPUR PIPED WATER SUPPLY SCHEME , SM/14909 New Material Requisition To Resource Division RTOR000270/2023-2024 2197/BWD 12/05/2023 Resource Division 7.32 0.00 0 0
3359 PURBA BARDHAMAN Bhatar Burdwan Division RAMCHANDRAPUR PIPED WATER SUPPLY SCHEME , SM/14909 New Material Requisition To Resource Division RTOR000557/2023-2024 4890/BWD 10/11/2023 Resource Division 10.17 0.00 0 0
3360 PURBA BARDHAMAN Bhatar Central Mechanical RAMCHANDRAPUR PIPED WATER SUPPLY SCHEME , SM/14909 New NEW SERVICE CONNECTION FOR RAMCHANDRAPUR ZONE - I PWSS BILL/02593/2023-2024 BP-2023-24-551 20/02/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 4.15 0.00 0 0
3361 PURBA BARDHAMAN Bhatar Central Mechanical RAMCHANDRAPUR PIPED WATER SUPPLY SCHEME , SM/14909 New Quotation for new service connection for Ramchandrapur Zone-2 PWSS PH 1. BILL/00226/2024-2025 BP-2024-25-117 28/05/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 4.39 0.00 0 0
3362 PURBA BARDHAMAN Bhatar Central Mechanical RAMCHANDRAPUR PIPED WATER SUPPLY SCHEME , SM/14909 New Quotation for new service connection for Ramchandarapur Zone-2 PWSS PH 2. BILL/00227/2024-2025 BP-2024-25-118 29/05/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 6.35 0.00 0 0
3363 PURBA BARDHAMAN Bhatar Central Mechanical RAMCHANDRAPUR PIPED WATER SUPPLY SCHEME , SM/14909 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1, 2, 3 & 4 at RAMCHANDRAPUR Water Supply Scheme [ Block- BHATAR ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000919/2023-2024 4183/CMD 29/08/2023 30 M/S, S.S. ENTERPRISE. 56.97 0.00 0 40
3364 PURBA BARDHAMAN Bhatar Central Mechanical RAMCHANDRAPUR PIPED WATER SUPPLY SCHEME , SM/14909 New Quotation for new service connection at Ramchandrapur Zone-1 PWSS PH-2 BILL/00392/2024-2025 BP-2024-25-205 18/07/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 5.44 0.00 0 0
3365 PURBA BARDHAMAN Bhatar Central Mechanical RAMCHANDRAPUR PIPED WATER SUPPLY SCHEME , SM/14909 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Karjana & others water supply scheme under Bhatar Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000067/2024-2025 2394/CMD 02/08/2024 90 AHALYA ENGINEERING WORKS 82.00 0.00 0 0
3366 PURBA BARDHAMAN Bhatar Burdwan Division RAMCHANDRAPUR PIPED WATER SUPPLY SCHEME , SM/14909 New Material Requisition To Resource Division RTOR000083/2024-2025 409/BWD 17/01/2025 Resource Division 2.94 0.00 0 0
3367 PURBA BARDHAMAN Bhatar Burdwan Division RAMCHANDRAPUR PIPED WATER SUPPLY SCHEME , SM/14909 New RAMCHANDRAPUR (ZONE-I & II ) Piped Water Supply Scheme with sinking of Tube-well, LDS, Rising Main, FHTC, Construction of RCC OHR with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drain and internal pathway at different TW site under Bhatar Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer1, Durgapur Sub-Division, PHE Dte.,Junior Engineer2, Durgapur Sub-Division, PHE Dte. ORD/000536/2023-2024 3703/BWD 24/08/2023 677 SUPRITI ENTERPRISE 582.13 0.00 0 60
3368 PURBA BARDHAMAN Kalna - II Burdwan Division ANGARSON PIPED WATER SUPPLY SCHEME , SM/15587 New Material Requisition To Resource Division RTOR000060/2023-2024 1962/BWD 25/04/2023 Resource Division 42.44 0.00 0 0
3369 PURBA BARDHAMAN Kalna - II Burdwan Division ANGARSON PIPED WATER SUPPLY SCHEME , SM/15587 New Material Requisition To Resource Division RTOR000210/2023-2024 2155/BWD 10/05/2023 Resource Division 13.32 0.00 0 0
3370 PURBA BARDHAMAN Kalna - II Central Mechanical ANGARSON PIPED WATER SUPPLY SCHEME , SM/15587 New New electric connection for Angarson PWSS, PH-1. BILL/01888/2023-2024 BP-2023-24-349 11/01/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 4.47 0.00 0 0
3371 PURBA BARDHAMAN Kalna - II Central Mechanical ANGARSON PIPED WATER SUPPLY SCHEME , SM/15587 New New service connection charges for Angarson PWSS TW-2 BILL/01865/2023-2024 BP-2023-24-350 11/01/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 6.07 0.00 0 0
3372 PURBA BARDHAMAN Kalna - II Burdwan Division ANGARSON PIPED WATER SUPPLY SCHEME , SM/15587 New Work Order for "CONSTRUCTION OF TEMPORARY KIOSK FOR THE NECESSARY ARRANGEMENT OF ELECTRIFICATION OF TUBEWELL FOR ANGERSON PWSS UNDER KALNA SUB-DIVISION UNDER BURDWAN DIVISION, PHE DTE." Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/001149/2023-2024 2105/KSD 04/03/2024 10 ER CONSTRUCTION & GENERAL ORDER SUPPLIER 0.66 0.00 0 2
3373 PURBA BARDHAMAN Kalna - II Central Mechanical ANGARSON PIPED WATER SUPPLY SCHEME , SM/15587 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Khargakur & others water supply scheme under Kalna-2 Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000116/2024-2025 2393/CMD 02/08/2024 280 HANNAN BUILDERS PVT LTD 76.80 0.00 0 20
3374 PURBA BARDHAMAN Kalna - II Central Mechanical ANGARSON PIPED WATER SUPPLY SCHEME , SM/15587 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at ANGARSON Water Supply Scheme [ Block- KALNA-2] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000894/2023-2024 4157/CMD 29/08/2023 640 S.K. ELECTRICALS 27.77 0.00 0 95
3375 PURBA BARDHAMAN Kalna - II Burdwan Division ANGARSON PIPED WATER SUPPLY SCHEME , SM/15587 New Pipeline laying by HDD method and different types of balance works in connection with different Augmentation & New Scheme [(SM/ 08103), (SM/13413), (SM/15587), (SM/16035), (SM/16287), (SM/16029), (SM/15581), (SM/14437), (SM/16028), (SM/16036) & (SM/14425)] within Kalna Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer ORD/001270/2024-2025 849/BWD 05/03/2025 180 S.P. CONSTRUCTION 683.30 0.00 0 0
3376 PURBA BARDHAMAN Kalna - II Burdwan Division ANGARSON PIPED WATER SUPPLY SCHEME , SM/15587 New Different works related (sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of different capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site) to ANGARSON, BHABANANDAPUR &DAFARPUR Piped Water Supply Scheme under Kalna ¿ II Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE,Junior Engineer, R.W.S. Burdwan Sub Division, P.H.E. Dt ORD/000702/2023-2024 4480/BWD 11/10/2023 724 M/S GHOSH & CO. 1,093.29 33.61 3.07 60
3377 PURBA BARDHAMAN Raina - I Burdwan Division PROCUREMENT OF LAND OF PALASON RAINA-I BLOCK DIST PURBA BARDHAMAN VIDE G O NO PHE/2060/IL-72/19 DATED 01/09/2021 OF THE DEPUTY SECRETARY TECHNICAL TO THE GOVERNMENT OF WEST BENGAL. , SM/14188 New PROCUREMENT OF LAND OF PALASON RAINA-I BLOCK DIST PURBA BARDHAMAN VIDE G O NO PHE/2060/IL-72/19 DATED 01/09/2021 OF THE DEPUTY SECRETARY TECHNICAL TO THE GOVERNMENT OF WEST BENGAL. BILL/00430/2024-2025 1030/LAND 25/10/2024 PURBA BARDHAMAN ZILLA PARISHAD 28.04 0.00 0 0
3378 PURBA BARDHAMAN Jamalpur Burdwan Division PROCUREMENT OF LAND OF MADHABPUR JAMALPUR BLOCK DISTRICT PURBA BARDHAMAN VIDE G O NO PHE/2060/IL-72/19 DATED 01/09/2021 OF THE DEPUTY SECRETARY TECHNICAL TO THE GOVERNMENT OF WEST BENGAL , SM/14189 New PROCUREMENT OF LAND OF MADHABPUR JAMALPUR BLOCK DISTRICT PURBA BARDHAMAN VIDE G O NO PHE/2060/IL-72/19 DATED 01/09/2021 OF THE DEPUTY SECRETARY TECHNICAL TO THE GOVERNMENT OF WEST BENGAL BILL/00431/2024-2025 1031/LAND 25/10/2024 PURBA BARDHAMAN ZILLA PARISHAD 22.22 0.00 0 0
3379 PURBA BARDHAMAN Ketugram - I Burdwan Division MURGRAM PIPED WATER SUPPLY SCHEME , SM/15156 New Material Requisition To Resource Division RTOR000011/2023-2024 1962/BWD 25/04/2023 Resource Division 1.38 0.00 0 0
3380 PURBA BARDHAMAN Ketugram - I Burdwan Division MURGRAM PIPED WATER SUPPLY SCHEME , SM/15156 New Material Requisition To Resource Division RTOR000347/2023-2024 2197/BWD 12/05/2023 Resource Division 18.01 0.00 0 0
3381 PURBA BARDHAMAN Ketugram - I Burdwan Division MURGRAM PIPED WATER SUPPLY SCHEME , SM/15156 New Material Requisition To Resource Division RTOR000744/2023-2024 5260/BWD 30/11/2023 Resource Division 20.18 0.00 0 0
3382 PURBA BARDHAMAN Ketugram - I Central Drilling MURGRAM PIPED WATER SUPPLY SCHEME , SM/15156 New Providing drilling crew and other allied works for construction of Tube Well (250mm X200mm X 114 Mtrs. Depth) by utilising Departmental Machineries for Murgram W/S Scheme (T/W-I & II) , Ketugram-I Block under Purba Bardhman District, Central Drilling Division, P.H.E. Dte. Driller In Charge Junior Engineer ORD/000173/2023-2024 1345/CDD 13/09/2023 30 OSMAN SEKH 16.61 0.00 0 0
3383 PURBA BARDHAMAN Ketugram - I Central Mechanical MURGRAM PIPED WATER SUPPLY SCHEME , SM/15156 New Quotation for new service connection at Murgram W/S Scheme PH-II. BILL/01807/2023-2024 BP-2023-24-314 30/12/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.25 0.00 0 0
3384 PURBA BARDHAMAN Ketugram - I Central Mechanical MURGRAM PIPED WATER SUPPLY SCHEME , SM/15156 New Quotation for new service connection at Murgram W/S Scheme PH-I. BILL/01808/2023-2024 BP-2023-24-313 30/12/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 4.21 0.00 0 0
3385 PURBA BARDHAMAN Ketugram - I Central Mechanical MURGRAM PIPED WATER SUPPLY SCHEME , SM/15156 New Supply & Delivery of 3 Phase actuator operated wafer type butterfly valve for Tube well No.- 1 at MURGRAM Water Supply Scheme [Block- KETUGRAM-1] under CMD, PHE Dte., Dist.- Purba-Bardhaman. Driller In-Charge ORD/001622/2023-2024 348/DIC/BMSD(D) 22/12/2023 7 SUBRATA BHADRA 0.98 0.00 0 0
3386 PURBA BARDHAMAN Ketugram - I Central Mechanical MURGRAM PIPED WATER SUPPLY SCHEME , SM/15156 New NEW SERVICE CONNECTION FOR MURGRAM PWSS PH-I. BILL/00103/2024-2025 BP-2024-25-44 26/04/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 1.64 0.00 0 0
3387 PURBA BARDHAMAN Ketugram - I Central Mechanical MURGRAM PIPED WATER SUPPLY SCHEME , SM/15156 New Supply & delivery of Submersible Pumping Machinery, Suspension clamp and tube well cover etc. Tube well No.- 1 at MURGRAM Water Supply Scheme [ Block· KETUGRAM -1] under CMD, PHE Dte,. Dist.- Purba-Bardhaman. Driller In-Charge Junior Engineer ORD/001627/2023-2024 25/DIC/BMSD(D) 05/01/2024 7 SUBRATA BHADRA 0.86 0.00 0 100
3388 PURBA BARDHAMAN Ketugram - I Central Mechanical MURGRAM PIPED WATER SUPPLY SCHEME , SM/15156 New Supply & delivery of valves, starter and Installation of Submersible Pumping Machinery for Tube well No. - 1 at MURGRAM Water Supply Scheme [ Block- KETUGRAM -1] under CMD, PHE Dte., Dist.· Purba Bardhaman. Driller In-Charge Junior Engineer ORD/001633/2023-2024 48/DIC/BMSD(D) 19/01/2024 15 SUBRATA BHADRA 0.69 0.00 0 100
3389 PURBA BARDHAMAN Ketugram - I Central Mechanical MURGRAM PIPED WATER SUPPLY SCHEME , SM/15156 New Supply & Delivery of Submersible cable and column pipes for Tube Well No No:-1 at MURGRAM water supply scheme[ Block - KETUGRAM -1] under CMD, PHE Dte,. Dist.- Purba-Bardhaman. Driller In-Charge Junior Engineer ORD/001629/2023-2024 41/DIC/BMSD(D) 15/01/2024 7 SUBRATA BHADRA 0.87 0.00 0 100
3390 PURBA BARDHAMAN Ketugram - I Central Mechanical MURGRAM PIPED WATER SUPPLY SCHEME , SM/15156 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at MURGRAM Water Supply Scheme [ Block- KETUGRAM-1] under CMD, PHE Dte., Dist.- Purba-Bardhaman. Driller In-Charge Junior Engineer ORD/000850/2023-2024 4122/CMD 29/08/2023 30 S.K. ELECTRICALS 27.77 0.00 0 46
3391 PURBA BARDHAMAN Ketugram - I Central Mechanical MURGRAM PIPED WATER SUPPLY SCHEME , SM/15156 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Rajur & others water supply scheme under Ketugram-I Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. Driller In-Charge Junior Engineer ORD/000098/2024-2025 2407/CMD 02/08/2024 90 M.S. ENTERPRISE 82.29 0.00 0 0
3392 PURBA BARDHAMAN Ketugram - I Burdwan Division MURGRAM PIPED WATER SUPPLY SCHEME , SM/15156 New Balance work for OHR, extension of pipeline to provide FHTC with sinking of tube well, construction of pump house, boundary wall, land development, plinth protection for pump house, approach road & other related work under Murgram, Moregram, Malgram, Khanji, PWSS under Katwa Sub Division, Block- Ketugram-I, Burdwan Division PHE Dte. Assistant Engineer JUNIOR ENGINEER R.W.S. BURDWAN SUB-DIVISION PHE DTE ORD/000289/2024-2025 2739/BWD 12/07/2024 120 PUSPA ENTERPRISE 185.75 0.00 0 72
3393 PURBA BARDHAMAN Ketugram - I Burdwan Division MURGRAM PIPED WATER SUPPLY SCHEME , SM/15156 New Different works related (sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of different capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site) to MALGRAM, MURGRAM, MORGRAM & KHANJI Piped Water Supply Scheme under KETUGRAM -I Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer JUNIOR ENGINEER R.W.S. BURDWAN SUB-DIVISION PHE DTE ORD/000435/2023-2024 3387/BWD 03/08/2023 365 PUSPA ENTERPRISE 1,333.98 91.59 6.87 40
3394 PURBA BARDHAMAN Burdwan - II Burdwan Division GROUND WATER BASED GANGPUR PIPED WATER SUPPLY SCHEME , SM/15487 New Material Requisition To Resource Division RTOR000023/2023-2024 1962/BWD 25/04/2023 Resource Division 6.43 0.00 0 0
3395 PURBA BARDHAMAN Burdwan - II Burdwan Division GROUND WATER BASED GANGPUR PIPED WATER SUPPLY SCHEME , SM/15487 New Material Requisition To Resource Division RTOR000255/2023-2024 2197/BWD 12/05/2023 Resource Division 4.55 0.00 0 0
3396 PURBA BARDHAMAN Burdwan - II Burdwan Division GROUND WATER BASED GANGPUR PIPED WATER SUPPLY SCHEME , SM/15487 New Material Requisition To Resource Division RTOR000401/2023-2024 3873/BWD 01/09/2023 Resource Division 5.75 0.00 0 0
3397 PURBA BARDHAMAN Burdwan - II Central Mechanical GROUND WATER BASED GANGPUR PIPED WATER SUPPLY SCHEME , SM/15487 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at Gangpur Water Supply Scheme [ Block- Burdwan-2 ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER Junior Engineer ORD/000670/2023-2024 4008/CMD 29/08/2023 30 CHATTERJEE ENTERPRISE 28.95 0.00 0 0
3398 PURBA BARDHAMAN Burdwan - II Burdwan Division GROUND WATER BASED GANGPUR PIPED WATER SUPPLY SCHEME , SM/15487 New Material Requisition To Resource Division RTOR000566/2023-2024 4920/BWD 10/11/2023 Resource Division 42.46 0.00 0 0
3399 PURBA BARDHAMAN Burdwan - II Central Mechanical GROUND WATER BASED GANGPUR PIPED WATER SUPPLY SCHEME , SM/15487 New NEW SERVICE CONNECTION FOR GANGPUR TW 1. BILL/02953/2023-2024 BP-2023-24-636 15/03/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 7.74 0.00 0 0
3400 PURBA BARDHAMAN Burdwan - II Central Mechanical GROUND WATER BASED GANGPUR PIPED WATER SUPPLY SCHEME , SM/15487 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at KUSHA & others water supply scheme under Bardhaman-II Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman ASSISTANT ENGINEER Junior Engineer ORD/000065/2024-2025 2389/CMD 02/08/2024 90 DILIP MAHATO 53.14 0.00 0 0
3401 PURBA BARDHAMAN Burdwan - II Central Mechanical GROUND WATER BASED GANGPUR PIPED WATER SUPPLY SCHEME , SM/15487 New Quotation for new service connection Gangpur PWSS TW-2. BILL/00322/2024-2025 BP-2024-25-163 01/07/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.72 0.00 0 0
3402 PURBA BARDHAMAN Burdwan - II Burdwan Division GROUND WATER BASED GANGPUR PIPED WATER SUPPLY SCHEME , SM/15487 New Material Requisition To Resource Division RTOR000012/2024-2025 4112/BWD 25/11/2024 Resource Division 15.69 0.00 0 0
3403 PURBA BARDHAMAN Burdwan - II Burdwan Division GROUND WATER BASED GANGPUR PIPED WATER SUPPLY SCHEME , SM/15487 New Construction of BT road from Gangpur Kanthalbagan to Durga Mandir with a link to Rokha Kalitala. BILL/01127/2024-2025 1518/JJM 18/03/2025 PURBA BARDHAMAN ZILLA PARISHAD 2.05 0.00 0 null
3404 PURBA BARDHAMAN Burdwan - II Burdwan Division GROUND WATER BASED GANGPUR PIPED WATER SUPPLY SCHEME , SM/15487 New Different works related (sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of different capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site) to BALGANA & GANGPUR Piped Water Supply Scheme under Burdwan ¿ II Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. Junior Engineer, Burdwan Sadar Sub-Division ORD/000538/2023-2024 3699/BWD 24/08/2023 769 SUPRITI ENTERPRISE 1,345.79 0.00 0 20
3405 PURBA BARDHAMAN Burdwan Division AUGMENTATION BHALKI Z-I & Z-II PWSS , SM/15560 Augmentation Aug. of BHALKI ZONE-II Piped Water Supply Scheme with Rising Main & Construction of 200 cum capacity RCC OHR with 20.0 mtr. with Staging height including soil investigation at Headwork TW site under Ausgram-II Block, District:- Purba-Bardhaman. Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/001022/2023-2024 568/BWD 08/02/2024 180 SK ABDUL LALAN 74.12 0.00 0 0
3406 PURBA BARDHAMAN Central Mechanical AUGMENTATION BHALKI Z-I & Z-II PWSS , SM/15560 Augmentation New service connection charges for Bhalki PWSS TW-1 BILL/00786/2024-2025 BP-2024-25-298 17/09/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 2.63 0.00 0 0
3407 PURBA BARDHAMAN Central Mechanical AUGMENTATION BHALKI Z-I & Z-II PWSS , SM/15560 Augmentation Quotation for new service connection at Bhalki Zone-I/Zone-II, Aug-1. PWSS BILL/00897/2024-2025 BP-2024-25-337 04/10/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 4.77 0.00 0 0
3408 PURBA BARDHAMAN Central Mechanical AUGMENTATION BHALKI Z-I & Z-II PWSS , SM/15560 Augmentation QUOTATION AS PER WBSEDCL FOR BHALKI ZONE -1(AUG) TW-2 BILL/01334/2024-2025 BP-2024-25-431 31/01/2025 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 5.09 0.00 0 null
3409 PURBA BARDHAMAN Central Mechanical AUGMENTATION BHALKI Z-I & Z-II PWSS , SM/15560 Augmentation Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination system and internal House wiring for Tube well no.- 1 & 2 at Augmentation of BHALKI (ZONE-I & II) [AUSGRAM-II] Water Supply Scheme under CMD, PHE Dte., Dist.- Purba-Bardhaman. Driller In-Charge Junior Engineer ORD/001088/2023-2024 4510/CMD 06/10/2023 726 C.M. ENTERPRISE 24.42 0.00 0 50
3410 PURBA BARDHAMAN Burdwan Division AUGMENTATION BHALKI Z-I & Z-II PWSS , SM/15560 Augmentation Source Augmentation of BHALKI Zone-I & Zone-II Piped Water Supply Scheme [Tube Well, Pump House, Boundary Wall, Rising Main, FHTC, etc.], Block-Ausgram-II, Dist.- Purba Bardhaman, under Burdwan Division P.H.E. Dte. Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer ORD/000104/2023-2024 2273/BWD 18/05/2023 713 S.R. ENTERPRISE 92.20 0.00 0 40
3411 PURBA BARDHAMAN Burdwan Division AUGMENTATION BHALKI Z-I & Z-II PWSS , SM/15560 Augmentation Aug. of BHALKI ZONE-I Piped Water Supply Scheme with Rising Main & Construction of 400 cum capacity RCC OHR with 20.0 mtr. with Staging height including soil investigation at Headwork TW site under Ausgram-II Block, District:- Purba-Bardhaman. Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/001014/2023-2024 474/BWD 05/02/2024 510 SK AFJAL RAHAMAN 114.56 0.00 0 25
3412 PURBA BARDHAMAN Mangolkote Burdwan Division CHAKULIA PIPE WATER SUPPLY SCHEME , SM/15162 New Material Requisition To Resource Division RTOR000032/2023-2024 1962/BWD 25/04/2023 Resource Division 1.38 0.00 0 0
3413 PURBA BARDHAMAN Mangolkote Burdwan Division CHAKULIA PIPE WATER SUPPLY SCHEME , SM/15162 New Material Requisition To Resource Division RTOR000288/2023-2024 2197/BWD 12/05/2023 Resource Division 7.80 0.00 0 0
3414 PURBA BARDHAMAN Mangolkote Burdwan Division CHAKULIA PIPE WATER SUPPLY SCHEME , SM/15162 New Material Requisition To Resource Division RTOR000713/2023-2024 5047/BWD 23/11/2023 Resource Division 19.78 0.00 0 0
3415 PURBA BARDHAMAN Mangolkote Central Drilling CHAKULIA PIPE WATER SUPPLY SCHEME , SM/15162 New Providing drilling crew and other allied works for construction of Tube Well (250mm X150mm X 240 Mtrs. Depth) by utilizing Departmental Machineries for Chakulia W/S Scheme (T/W-I & II), Block- Mangolkote under Purba Bardhman District, Central Drilling Division, P.H.E. Dte. Assistant Engineer Junior Engineer ORD/000198/2023-2024 1339/CDD 13/09/2023 210 M/S SAIKAT ENTERPRISE 23.35 0.00 0 100
3416 PURBA BARDHAMAN Mangolkote Burdwan Division CHAKULIA PIPE WATER SUPPLY SCHEME , SM/15162 New Supply, delivery, installation & hand hold demonstration of different equipments / machineries to test HDPE pipes as per IS: 4984-2016 at the pipe testing laboratory at Nababhat under Burdwan Division, PHE. Dte._2ND CALL AE(HQs) J.E. 1 BURDWAN ORD/001212/2023-2024 907/BWD 04/03/2024 30 MANASH GHOSH 23.87 0.00 0 100
3417 PURBA BARDHAMAN Mangolkote Central Mechanical CHAKULIA PIPE WATER SUPPLY SCHEME , SM/15162 New Quotation for new service connection for Chakulia PWSS TW-1. BILL/00255/2024-2025 BP-2024-25-134 05/06/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.57 0.00 0 0
3418 PURBA BARDHAMAN Mangolkote Central Mechanical CHAKULIA PIPE WATER SUPPLY SCHEME , SM/15162 New Quotation for new service connection for Chakulia PWSS TW-2. BILL/00253/2024-2025 BP-2024-25-133 05/06/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 5.10 0.00 0 0
3419 PURBA BARDHAMAN Mangolkote Central Mechanical CHAKULIA PIPE WATER SUPPLY SCHEME , SM/15162 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Jabagram & others water supply scheme under Mangalkote Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. Driller In-Charge Junior Engineer ORD/000118/2024-2025 2590/CMD 27/08/2024 90 M/S SAJAHAN CHOWDHURY 62.06 0.00 0 0
3420 PURBA BARDHAMAN Mangolkote Central Mechanical CHAKULIA PIPE WATER SUPPLY SCHEME , SM/15162 New Additional quotation in second time against additional work at Chakulia PWSS TW-2 BILL/00683/2024-2025 BP-2024-25-268 21/08/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 0.31 0.00 0 0
3421 PURBA BARDHAMAN Mangolkote Burdwan Division CHAKULIA PIPE WATER SUPPLY SCHEME , SM/15162 New Different works related (sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of different capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site) to CHAKULIA, KULSANA & HALIMPUR Piped Water Supply Scheme under MONGALKOTE Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer J.E. katwa,JUNIOR ENGINEER R.W.S. BURDWAN SUB-DIVISION PHE DTE ORD/000461/2023-2024 3443/BWD 08/08/2023 365 ASHOK KUMAR GHOSH 1,588.10 0.00 0 15
3422 PURBA BARDHAMAN Mangolkote Burdwan Division CHAKULIA PIPE WATER SUPPLY SCHEME , SM/15162 New Material Requisition To Resource Division RTOR000014/2024-2025 4110/BWD 25/11/2024 Resource Division 9.28 0.00 0 0
3423 PURBA BARDHAMAN Mangolkote Burdwan Division CHAKULIA PIPE WATER SUPPLY SCHEME , SM/15162 New Balance work of CHAKULIA Piped Water Supply Scheme with sinking of Tube-well, LDS, FHTC & construction of switch rooms & boundary walls with gates and land development, drain and internal pathway at different TW site under Mongalkote Block, District:- Purba-Bardhaman Assistant Engineer ORD/001263/2024-2025 846/BWD 05/03/2025 120 M/S M.M. ENTERPRISE 214.08 0.00 0 0
3424 PURBA BARDHAMAN Mangolkote Central Mechanical CHAKULIA PIPE WATER SUPPLY SCHEME , SM/15162 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System, Internal House Wiring and Compound lighting arrangement for Tube well No.- 1 & 2 at CHAKULIA Water Supply Scheme [BLOCK- MANGOLKOTE] under CMD, PHE Dte., Dist.- Purba-Bardhaman Driller In-Charge Junior Engineer ORD/001604/2023-2024 1534/CMD 05/03/2024 626 CHATTERJEE ENTERPRISE 28.81 0.00 0 70
3425 PURBA BARDHAMAN Central Mechanical AUGMENTATION OF GROUND WATER BASED NABABHAT PWSS (PART B) , SM/15166 Augmentation New service connection charges of Aug. Nababhat W/S Scheme TW-3 BILL/00686/2023-2024 BP-2023-24-31 23/06/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 2.58 0.00 0 0
3426 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED NABABHAT PWSS (PART B) , SM/15166 Augmentation Balance work for Augmentation of Nababhat PWSS in connection with renovation and modification of administrative office complex building under Burdwan Division PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000450/2023-2024 3400/BWD 03/08/2023 30 SANDIPAN SENGUPTA 7.78 7.76 99.74 100
3427 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED NABABHAT PWSS (PART B) , SM/15166 Augmentation Construction of Pump House cum chlorine room without sanitary and water supply arrangement at Tube Well Site to departmental drawing no-PHE/BD/P.H/DRG/02/DEC-17(Size 3.60 mtr x 3.00 mtr room) for NABABHAT its Adjoining Mouza W/S Scheme, Block -Bardhaman-I within Burdwan Sub-Division, PHE Dte. (Mouza- KRISHNAPUR) Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000830/2022-2023 499/BSD 21/03/2023 45 BHASKAR NANDY 3.16 2.73 86.39 100
3428 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED NABABHAT PWSS (PART B) , SM/15166 Augmentation Balance work for Augmentation of Nababhat PWSS in connection with renovation and modification of administrative office complex building under Burdwan Division PHE Dte. (Part - II). Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. J.E. 1 BURDWAN ORD/000849/2023-2024 5156/BWD 24/11/2023 30 SANDIPAN SENGUPTA 9.63 4.78 49.64 100
3429 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED NABABHAT PWSS (PART B) , SM/15166 Augmentation Laying of inter connection between 3rd tube well site (Mouza-Krishnapur) and distribution system for Nababhat PWSS within Bardhaman-I Block , under Burdwan Division, PHE Dte ORD/000942/2023-2024 2951/BSD 19/12/2023 45 I.S. ENTERPRISE 2.91 0.00 0 100
3430 PURBA BARDHAMAN Central Mechanical AUGMENTATION OF GROUND WATER BASED NABABHAT PWSS (PART B) , SM/15166 Augmentation Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination system and internal House wiring for Tube well no.- 1 & 2 at Augmentation of NABABHAT( Part-B)[BURDWAN-I] Water Supply Scheme under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER Junior Engineer ORD/000571/2023-2024 3899/CMD 18/08/2023 30 CINZANO 22.41 0.00 0 50
3431 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED NABABHAT PWSS (PART B) , SM/15166 Augmentation Allied work for Augmentation of NABABHAT PWSS under Burdwan-I Block of Burdwan Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE,Junior Engineer, Burdwan Sadar Sub-Division ORD/000432/2023-2024 3360/BWD 02/08/2023 60 M/S ANAND CONSTRUCTION 40.09 0.00 0 100
3432 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED NABABHAT PWSS (PART B) , SM/15166 Augmentation Providing laying distribution pipe line due to Constructioon of road by GP for NABABHAT PWSS under Burdwan-I Block of within Burdwan Sub Division under Burdwan Division PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. Junior Engineer, Burdwan Sadar Sub-Division ORD/001190/2023-2024 536/BSD 14/03/2024 30 NABAKUMAR DAS 0.86 0.00 0 100
3433 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED NABABHAT PWSS (PART B) , SM/15166 Augmentation Providing laying distrfrrrrribution pipe line at Amtala-Sukantapally due to construction of Road by gp for Nababhat PWSS under Burdwan-I Block of Burdwan Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. Junior Engineer, Burdwan Sadar Sub-Division ORD/000143/2024-2025 1031/BSD 10/06/2024 30 SANDIPAN SENGUPTA 0.96 0.00 0 100
3434 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED NABABHAT PWSS (PART B) , SM/15166 Augmentation Balance work for Augmentation of Nababhat PWSS in connection with Construction of Cycle Shed at PHE office complex at Nababhat under Burdwan Division PHE Dte. AE(HQs) J.E. 1 BURDWAN ORD/000738/2024-2025 854/AE/HQ 23/10/2024 30 SANDIPAN SENGUPTA 5.37 0.00 0 100
3435 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED NABABHAT PWSS (PART B) , SM/15166 Augmentation Providing laying parallal distribution pipe line from Krishnapur pump to Kishnapur Baganpara for Nababhat PWSS under Burdwan-I Block of Burdwan Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/001078/2024-2025 373/BWD 16/01/2025 30 M/S ANAND CONSTRUCTION 5.97 0.00 0 0
3436 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED NABABHAT PWSS (PART B) , SM/15166 Augmentation Balance Work for extension of pipe lines to provide FHTC With Sinking of Tub well , Construction of pump house with Boundary wall & other related work for TALIT-SIMDAL (SM/18112), NABABHAT (SM-15166) and DEWANDIGHI-MIRJAPUR (SM/09494) PWSS under Burdwan Sub-Div., Block -Bwn-1, under Burdwan Division PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/001248/2024-2025 793/BWD 03/03/2025 120 M/S S.S. ENTERPRISE 227.66 0.00 0 0
3437 PURBA BARDHAMAN Central Mechanical AUGMENTATION OF GROUND WATER BASED NABABHAT PWSS (PART B) , SM/15166 Augmentation Supply & Installation of submersible pumping machinery, different electro-mechanical works for Nababhat w/s scheme, T.W. No.-I (Replacement tubewell) and Power Backup arrangement at the office of the Burdwan Division & Durgapur w/s Division including RWS, Purba Bardhaman under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER Junior Engineer ORD/000324/2024-2025 2695/CMD 11/09/2024 263 CHOUDHURY ENTERPRISE 24.83 0.00 0 100
3438 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED NABABHAT PWSS (PART B) , SM/15166 Augmentation Sinking of 250 X 200 mm dia Tube Well (Replace) 150 mtr. Depth by D.R. Rig method using UPVC pipe (CD) and UPVC Deep Well Screen (RDS) for Head works TW site of NABABHAT Scheme under Burdwan - I Block within Burdwan Sub-Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. Junior Engineer, Burdwan Sadar Sub-Division ORD/001076/2024-2025 372/BWD 16/01/2025 30 DAS CONSTRUCTION 12.27 0.00 0 100
3439 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED NABABHAT PWSS (PART B) , SM/15166 Augmentation Restoration of Road damaged by laying of Pipeline with ballah piling work at different location for NABABHAT Piped Water Supply Scheme, Block- Burdwan -I, within Burdwan Sub Division under Burdwan Division PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000282/2024-2025 2714/BWD 11/07/2024 174 GENUINE ENGINEERS CO-OP. SOCIETY LTD. 17.93 0.00 0 100
3440 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED NABABHAT PWSS (PART B) , SM/15166 Augmentation Balance work for Augmentation of Nababhat PWSS in connection with upgradation of Approach Road, Land Development, etc for Head Works Site of Nababhat PWSS under Burdwan Division PHE Dte. AE(HQs) J.E. 1 BURDWAN ORD/001208/2024-2025 661/BWD 18/02/2025 30 M/S S. CHOUDHURY 19.92 0.00 0 100
3441 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR RUPPUR , SM/15185 Augmentation Preparation and Submission of DPR for Augmentation of Ruppur PWSS under Jamalpur Development Block under Burdwan Division, P.H.E Dte.[2nd Call] ORD/000351/2023-2024 1478/BSD 12/07/2023 15 CARTO 0.78 0.38 48.72 100
3442 PURBA BARDHAMAN Central Mechanical AUGMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR RUPPUR , SM/15185 Augmentation Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.- 3 at Augumentation of RUPPUR Water Supply Scheme [BLOCK- JAMALPUR] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/001609/2023-2024 1540/CMD 05/03/2024 60 KAMAKHYA ENTERPRISE 12.33 0.00 0 0
3443 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR RUPPUR , SM/15185 Augmentation Providing FHTC for 100% coverage at RUPPUR & Dhuluk Habitation (Village) for RUPPUR Piped W/S Scheme, Jamalpur Dev. Block under Burdwan Division, PHE Dte. AE(HQs) Junior Engineer, Burdwan Division ORD/000125/2023-2024 2315/BWD 19/05/2023 60 MAJILA ENTERPRISE 62.34 25.19 40.41 100
3444 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR RUPPUR , SM/15185 Augmentation Relaying and replace of damaged HDPE pipeline with repairing of valve for control of water flow within command area of RUPPUR Piped W/S Scheme at Ruppur Habitation,Jamalpur Development Block under Burdwan Division PHE Dte. RWS_JAMALPUR ORD/000155/2024-2025 1044/BSD 10/06/2024 30 SANDIPAN SENGUPTA 0.65 0.00 0 100
3445 PURBA BARDHAMAN Central Mechanical AUGMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR RUPPUR , SM/15185 Augmentation Illumination arrangement and miscellaneous works at Ruppur water supply scheme under Jamalpur Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000473/2024-2025 2947/CMD 20/11/2024 60 M/S. SWAPAN BANERJEE 19.64 0.00 0 0
3446 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR RUPPUR , SM/15185 Augmentation Sinking of 300 mm X 200 mm dia Tube Well 150 mtr. Depth by D.R. Rig method using UPVC pipe (CM) and UPVC Medium Well Screen (RMS) with construction of Pump House, Boundary wall, Land Development and Rising main connection of RUPPUR Piped Water Supply Scheme, Block- Jamalpur, District:- Purba-Bardhaman under Burdwan Division PHE Dte. [FOR 3rd. TUBE WELL SITE] AE(HQs) Junior Engineer, Burdwan Division ORD/000996/2024-2025 4593/BWD 31/12/2024 120 HI-LIGHT ELECTRONICS 26.20 0.00 0 30
3447 PURBA BARDHAMAN Central Mechanical AUGMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR RUPPUR , SM/15185 Augmentation Quotation Payment for Electricity At Ruppur Pwss Tw-03 BILL/01427/2024-2025 BP-2024-25-479 27/03/2025 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 8.97 0.00 0 null
3448 PURBA BARDHAMAN Raina - I Central Mechanical UCHITPUR PIPED WATER SUPPLY SINGLE VILLAGE SCHEME , SM/16254 New New service connection charges for Uchitpur PWSS TW-1 BILL/00776/2023-2024 BP-2023-24-79 24/07/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 6.26 0.00 0 0
3449 PURBA BARDHAMAN Raina - I Burdwan Division UCHITPUR PIPED WATER SUPPLY SINGLE VILLAGE SCHEME , SM/16254 New Material Requisition To Resource Division RTOR000422/2023-2024 3839/BWD 01/09/2023 Resource Division 1.31 0.00 0 0
3450 PURBA BARDHAMAN Raina - I Burdwan Division UCHITPUR PIPED WATER SUPPLY SINGLE VILLAGE SCHEME , SM/16254 New UCHITPUR Single Village Scheme with sinking of Tube-well, LDS, Rising Main, FHTC & construction of switch rooms & boundary walls with gates and land development, drain and internal pathway at different TW site under Raina-I Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000789/2022-2023 1422/BWD 24/03/2023 90 ANWESHA CONSTRUCTION 77.19 76.95 99.69 100
3451 PURBA BARDHAMAN Raina - I Burdwan Division UCHITPUR PIPED WATER SUPPLY SINGLE VILLAGE SCHEME , SM/16254 New Material Requisition To Resource Division RTOR000698/2023-2024 5068/BWD 23/11/2023 Resource Division 20.46 0.00 0 0
3452 PURBA BARDHAMAN Raina - I Burdwan Division UCHITPUR PIPED WATER SUPPLY SINGLE VILLAGE SCHEME , SM/16254 New Extension of pipeline & installation of Air Valve for providing FHTC at Dharapara & Malick para of Uchitpur village for UCHITPUR Piped Water Supply Scheme[New Scheme], Block- Raina-I within Burdwan Sub Division under Burdwan Division PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/001171/2023-2024 530/BSD 14/03/2024 30 ANWESHA CONSTRUCTION 0.96 0.00 0 0
3453 PURBA BARDHAMAN Raina - I Burdwan Division UCHITPUR PIPED WATER SUPPLY SINGLE VILLAGE SCHEME , SM/16254 New Providing FHTC at leftour part of Malik Para of Uchitpur Village under UCHITPUR Piped Water Supply Scheme, Block- Raina-I within Burdwan Sub Division under Burdwan Division PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/001037/2023-2024 281/BSD 09/02/2024 30 ANWESHA CONSTRUCTION 0.95 0.00 0 100
3454 PURBA BARDHAMAN Raina - I Burdwan Division UCHITPUR PIPED WATER SUPPLY SINGLE VILLAGE SCHEME , SM/16254 New Providing FHTC at leftour part of Dhara Para of Uchitpur Village under UCHITPUR Piped Water Supply Scheme, Block- Raina-I within Burdwan Sub Division under Burdwan Division PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/001094/2023-2024 518/BSD 13/03/2024 30 ANWESHA CONSTRUCTION 0.95 0.00 0 100
3455 PURBA BARDHAMAN Raina - I Central Mechanical UCHITPUR PIPED WATER SUPPLY SINGLE VILLAGE SCHEME , SM/16254 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Bajitpur, Belsar & other water supply scheme under Raina-1 Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000117/2024-2025 2589/CMD 27/08/2024 90 DEY ENTERPRISE 74.58 0.00 0 0
3456 PURBA BARDHAMAN Raina - I Central Mechanical UCHITPUR PIPED WATER SUPPLY SINGLE VILLAGE SCHEME , SM/16254 New Supply and Delivery of standby pump motor set for Sipta, Uchitpur, Haripur & others Water Supply Scheme under CMD, PHE Dte. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000142/2024-2025 2596/CMD 27/08/2024 30 JOYGURU ENTERPRISE 4.72 0.00 0 100
3457 PURBA BARDHAMAN Raina - I Burdwan Division UCHITPUR PIPED WATER SUPPLY SINGLE VILLAGE SCHEME , SM/16254 New Material Requisition To Resource Division RTOR000053/2024-2025 333/BWD 15/01/2025 Resource Division 2.75 0.00 0 0
3458 PURBA BARDHAMAN Raina - I Central Mechanical UCHITPUR PIPED WATER SUPPLY SINGLE VILLAGE SCHEME , SM/16254 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at Uchitpur Water Supply Scheme [ Block- Raina-1 ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000146/2023-2024 2881/CMD 07/07/2023 331 WEST BENGAL ENGINEERING CO. 28.96 5.72 19.75 100
3459 PURBA BARDHAMAN Kalna - II Burdwan Division KASIPUR PIPED WATER SUPPLY SCHEME , SM/16019 New Material Requisition To Resource Division RTOR000081/2023-2024 1962/BWD 25/04/2023 Resource Division 31.64 0.00 0 0
3460 PURBA BARDHAMAN Kalna - II Burdwan Division KASIPUR PIPED WATER SUPPLY SCHEME , SM/16019 New Material Requisition To Resource Division RTOR000374/2023-2024 2197/BWD 12/05/2023 Resource Division 6.85 0.00 0 0
3461 PURBA BARDHAMAN Kalna - II Central Mechanical KASIPUR PIPED WATER SUPPLY SCHEME , SM/16019 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at KASIPUR Water Supply Scheme [ Block- KALNA-2] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000899/2023-2024 4163/CMD 29/08/2023 30 P.K. ENGINEERING 28.59 0.00 0 0
3462 PURBA BARDHAMAN Kalna - II Central Mechanical KASIPUR PIPED WATER SUPPLY SCHEME , SM/16019 New New service at Kasipur PWSS TW-2. BILL/02293/2023-2024 BP-2023-24-439 29/01/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 4.72 0.00 0 0
3463 PURBA BARDHAMAN Kalna - II Central Mechanical KASIPUR PIPED WATER SUPPLY SCHEME , SM/16019 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Khargakur & others water supply scheme under Kalna-2 Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000116/2024-2025 2393/CMD 02/08/2024 280 HANNAN BUILDERS PVT LTD 76.80 0.00 0 20
3464 PURBA BARDHAMAN Kalna - II Burdwan Division KASIPUR PIPED WATER SUPPLY SCHEME , SM/16019 New Material Requisition To Resource Division RTOR000041/2024-2025 321/BWD 15/01/2025 Resource Division 3.11 0.00 0 0
3465 PURBA BARDHAMAN Kalna - II Burdwan Division KASIPUR PIPED WATER SUPPLY SCHEME , SM/16019 New Different Types of work involved in connection with Augmentation of 6 Nos. [(SM/07827), (SM/07866), (SM/16196), (SM/18314), (SM/16021), (SM/16019)] Piped Water Supply Scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/001144/2024-2025 618/BWD 11/02/2025 180 M/S DATTA ENTERPRISE 578.09 0.00 0 0
3466 PURBA BARDHAMAN Kalna - II Burdwan Division KASIPUR PIPED WATER SUPPLY SCHEME , SM/16019 New Road restoration work for implementation of KASIPUR PWSS (SM/16019) within Kalna Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/001167/2024-2025 559/BWD 06/02/2025 90 SUPRITI ENTERPRISE 9.43 0.00 0 100
3467 PURBA BARDHAMAN Kalna - II Burdwan Division KASIPUR PIPED WATER SUPPLY SCHEME , SM/16019 New Different works related (sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of different capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site) to KASIPUR, PATHAR GHATA & SABIDPUR Piped Water Supply Scheme under Kalna ¿ II Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000541/2023-2024 3697/BWD 24/08/2023 770 SUPRITI ENTERPRISE 1,185.67 59.58 5.03 42
3468 PURBA BARDHAMAN Kalna - II Burdwan Division BHABANANDAPUR PIPED WATER SUPPLY SCHEME , SM/16024 New Material Requisition To Resource Division RTOR000069/2023-2024 1962/BWD 25/04/2023 Resource Division 44.37 0.00 0 0
3469 PURBA BARDHAMAN Kalna - II Burdwan Division BHABANANDAPUR PIPED WATER SUPPLY SCHEME , SM/16024 New Material Requisition To Resource Division RTOR000251/2023-2024 2197/BWD 12/05/2023 Resource Division 18.56 0.00 0 0
3470 PURBA BARDHAMAN Kalna - II Central Mechanical BHABANANDAPUR PIPED WATER SUPPLY SCHEME , SM/16024 New New service connection for BHABANANDAPUR PWSS TW-1. BILL/02394/2023-2024 BP-2023-24-500 06/02/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 6.85 0.00 0 0
3471 PURBA BARDHAMAN Kalna - II Central Mechanical BHABANANDAPUR PIPED WATER SUPPLY SCHEME , SM/16024 New Quotation for new service connection for Bhabanandapur PWSS PH-2. BILL/00284/2024-2025 BP-2024-25-144 11/06/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 4.78 0.00 0 0
3472 PURBA BARDHAMAN Kalna - II Central Mechanical BHABANANDAPUR PIPED WATER SUPPLY SCHEME , SM/16024 New Additional quotation for Bhavanandapur PWSS PH-1 BILL/00427/2024-2025 BP-2024-25-223 26/07/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 0.67 0.00 0 0
3473 PURBA BARDHAMAN Kalna - II Central Mechanical BHABANANDAPUR PIPED WATER SUPPLY SCHEME , SM/16024 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Khargakur & others water supply scheme under Kalna-2 Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000116/2024-2025 2393/CMD 02/08/2024 280 HANNAN BUILDERS PVT LTD 76.80 0.00 0 20
3474 PURBA BARDHAMAN Kalna - II Central Mechanical BHABANANDAPUR PIPED WATER SUPPLY SCHEME , SM/16024 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at BHABANANDAPUR Water Supply Scheme [ Block- KALNA-2] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000922/2023-2024 4161/CMD 29/08/2023 521 SOUNAK ENTERPRISE 28.48 0.00 0 95
3475 PURBA BARDHAMAN Kalna - II Burdwan Division BHABANANDAPUR PIPED WATER SUPPLY SCHEME , SM/16024 New Different types of works involve in connection with Augmentation of KALYANPUR (SM/16299) Water Supply Scheme & BHABANANDAPUR (SM/16024) Water Supply Scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer JUNIOR ENGINEER RWS KALNA2 ORD/000189/2024-2025 2433/BWD 27/06/2024 247 BALAJEE ENTERPRISES 225.16 0.00 0 2
3476 PURBA BARDHAMAN Kalna - II Burdwan Division BHABANANDAPUR PIPED WATER SUPPLY SCHEME , SM/16024 New Different works related (sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of different capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site) to ANGARSON, BHABANANDAPUR &DAFARPUR Piped Water Supply Scheme under Kalna ¿ II Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE,Junior Engineer, R.W.S. Burdwan Sub Division, P.H.E. Dt ORD/000702/2023-2024 4480/BWD 11/10/2023 724 M/S GHOSH & CO. 1,093.29 0.00 0 60
3477 PURBA BARDHAMAN Manteswar Burdwan Division KHANPUR PIPED WATER SUPPLY SCHEME , SM/16540 New Material Requisition To Resource Division RTOR000381/2023-2024 2197/BWD 12/05/2023 Resource Division 11.22 0.00 0 0
3478 PURBA BARDHAMAN Manteswar Burdwan Division KHANPUR PIPED WATER SUPPLY SCHEME , SM/16540 New Material Requisition To Resource Division RTOR000531/2023-2024 4293/BWD 29/09/2023 Resource Division 2.89 0.00 0 0
3479 PURBA BARDHAMAN Manteswar Central Mechanical KHANPUR PIPED WATER SUPPLY SCHEME , SM/16540 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1, 2 & 3 at KHANPUR Water Supply Scheme [ Block-MONTESWAR] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000799/2023-2024 4086/CMD 29/08/2023 30 S DUTTA 43.47 0.00 0 0
3480 PURBA BARDHAMAN Manteswar Burdwan Division KHANPUR PIPED WATER SUPPLY SCHEME , SM/16540 New Material Requisition To Resource Division RTOR000558/2023-2024 4934/BWD 10/11/2023 Resource Division 67.03 0.00 0 0
3481 PURBA BARDHAMAN Manteswar Central Mechanical KHANPUR PIPED WATER SUPPLY SCHEME , SM/16540 New NEW SERVICE CONNECTION FOR KHANPUR PWSS. BILL/02687/2023-2024 BP-2023-24-562 23/02/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 5.01 0.00 0 0
3482 PURBA BARDHAMAN Manteswar Burdwan Division KHANPUR PIPED WATER SUPPLY SCHEME , SM/16540 New Material Requisition To Resource Division RTOR000030/2024-2025 310/BWD 15/01/2025 Resource Division 9.24 0.00 0 0
3483 PURBA BARDHAMAN Manteswar Central Mechanical KHANPUR PIPED WATER SUPPLY SCHEME , SM/16540 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Sutra & others water supply scheme under Monteswar Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000068/2024-2025 2396/CMD 02/08/2024 455 SINHA ELECTRICALS 78.06 0.00 0 20
3484 PURBA BARDHAMAN Manteswar Central Mechanical KHANPUR PIPED WATER SUPPLY SCHEME , SM/16540 New WBSEDCL quotation for NSC for Khanpur PH 2 BILL/01670/2024-2025 null 07/03/2025 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 5.69 0.00 0 null
3485 PURBA BARDHAMAN Manteswar Burdwan Division KHANPUR PIPED WATER SUPPLY SCHEME , SM/16540 New KHANPUR Piped Water Supply Scheme with sinking of Tube-well, LDS, Rising Main, FHTC, Construction of 400 cum capacity RCC OHR with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drain and internal pathway at different TW site under Monteswar Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte JUNIOR ENGINEER DURGAPUR SUB-DIVISION PHE DTE ORD/000803/2023-2024 4808/BWD 08/11/2023 723 NATIONAL CONSTRUCTION 707.70 0.00 0 60
3486 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF BAMANGARIA PIPED WATER SUPPLY SCHEME , SM/16304 Augmentation Augmentation of BAMANGARIA PWSS to accommodate FHTC, Laying Distribution System, Laying Rising Main, under Jal Jeevan Mission of Purbasthali - I Block, Purba Burdwan District under Burdwan Division, PHE.Dte. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000076/2023-2024 2044/BWD 03/05/2023 60 TAPAS KUMAR ROY 38.28 35.67 93.18 100
3487 PURBA BARDHAMAN Central Mechanical AUGMENTATION OF BAMANGARIA PIPED WATER SUPPLY SCHEME , SM/16304 Augmentation Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination system and internal House wiring for Tube well no.- 1 & 2 at Augmentation of BAMUNGARIA[PURBASTHALI-I] Water Supply Scheme under CMD, PHE Dte., Dist.- Purba-Bardhaman. ORD/001077/2023-2024 4201/CMD 29/08/2023 30 DAS TRADING CO. 24.41 0.00 0 0
3488 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF BAMANGARIA PIPED WATER SUPPLY SCHEME , SM/16304 Augmentation Conducting physical Household Survey at the IMIS reported village for HGJ certification and providing balance FHTC for Har Ghar Jal certification including conducting Gram Sabhas for different IMIS reported villages across the district under Burdwan Division, PHE Dte. AE(HQs),Assistant Engineer ,Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE.,Assistant Engineer, Durgapur Sub Division, P.H.E. Dte JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000428/2024-2025 3107/BWD 12/08/2024 90 TUBGRAM GRAMMYAK UNNAYAN SAMITY 309.60 0.00 0 50
3489 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF BAMANGARIA PIPED WATER SUPPLY SCHEME , SM/16304 Augmentation Work Order for "Restoration of HDPE Pipeline at 2nd Pump House adjacent to Bamungaria village in connection with Augmentation of Bamungaria PWSS under Kalna Sub-Division under Burdwan Division, PHE Dte.". Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000556/2024-2025 776/KSD 12/07/2024 15 SETH ENTERPRISE 0.81 0.00 0 100
3490 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF BAMANGARIA PIPED WATER SUPPLY SCHEME , SM/16304 Augmentation Construction of 1.5 mtrs. Height Boundary Wall along with 750 mm Height 3 layer barbed wire at Pump House- 1 in connection with Augmentation of BAMUNGARIA Piped water supply scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000720/2024-2025 3722/BWD 29/10/2024 30 GOUTAM DEY 9.60 0.00 0 1
3491 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF BAMANGARIA PIPED WATER SUPPLY SCHEME , SM/16304 Augmentation Construction of 1.5 mtrs. Height Boundary Wall along with 750 mm Height 3 layer barbed wire in connection with Augmentation of BAMUNGARIA Piped water supply scheme within Kalna Sub-Division under Burdwan Division, PHE Dte.(P.H: 2) Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000726/2024-2025 3726/BWD 29/10/2024 30 JAMALUDDIN SK 8.28 7.84 94.69 1
3492 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF BAMANGARIA PIPED WATER SUPPLY SCHEME , SM/16304 Augmentation Construction of 350cum OHR & Other Allied Works in connection with Augmentation of (SM/07803), (SM/09410), (SM/16304), (SM/15172) & (SM/14020) Piped Water Supply Scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/001048/2024-2025 220/BWD 10/01/2025 270 R.K. MANDAL& CO. 491.79 0.00 0 1
3493 PURBA BARDHAMAN Raina - I Burdwan Division NETRAKHANDA PIPED WATER SUPPLY SCHEME , SM/16616 New Material Requisition To Resource Division RTOR000355/2023-2024 2197/BWD 12/05/2023 Resource Division 7.53 0.00 0 0
3494 PURBA BARDHAMAN Raina - I Burdwan Division NETRAKHANDA PIPED WATER SUPPLY SCHEME , SM/16616 New Material Requisition To Resource Division RTOR000524/2023-2024 4290/BWD 29/09/2023 Resource Division 2.08 0.00 0 0
3495 PURBA BARDHAMAN Raina - I Central Mechanical NETRAKHANDA PIPED WATER SUPPLY SCHEME , SM/16616 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at Netrakhanda Water Supply Scheme [ Block- Raina-1 ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000722/2023-2024 4033/CMD 29/08/2023 30 GLACIER ENGINEERING CO 28.97 0.00 0 0
3496 PURBA BARDHAMAN Raina - I Burdwan Division NETRAKHANDA PIPED WATER SUPPLY SCHEME , SM/16616 New Material Requisition To Resource Division RTOR000682/2023-2024 5055/BWD 23/11/2023 Resource Division 20.46 0.00 0 0
3497 PURBA BARDHAMAN Raina - I Central Mechanical NETRAKHANDA PIPED WATER SUPPLY SCHEME , SM/16616 New New Service connection for Netrakhanda W/S Scheme PH No.-II BILL/01801/2023-2024 BP-2023-24-320 30/12/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.85 0.00 0 0
3498 PURBA BARDHAMAN Raina - I Central Mechanical NETRAKHANDA PIPED WATER SUPPLY SCHEME , SM/16616 New New Service connection for Netrakahanda W/S Scheme PH No.-I BILL/01802/2023-2024 BP-2023-24-319 30/12/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 6.70 0.00 0 0
3499 PURBA BARDHAMAN Raina - I Central Mechanical NETRAKHANDA PIPED WATER SUPPLY SCHEME , SM/16616 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Bajitpur, Belsar & other water supply scheme under Raina-1 Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000117/2024-2025 2589/CMD 27/08/2024 90 DEY ENTERPRISE 74.58 0.00 0 0
3500 PURBA BARDHAMAN Raina - I Burdwan Division NETRAKHANDA PIPED WATER SUPPLY SCHEME , SM/16616 New NETRAKHANDA Piped Water Supply Scheme with sinking of Tube-well, LDS, Rising Main, FHTC, Construction of 200 cum capacity RCC OHR with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drain and internal pathway at different TW site under Raina-I Block, District:- Purba-Bardhaman [NEW SCHEME]_2ND CALL Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000660/2023-2024 4121/BWD 14/09/2023 365 SUJAY KUMAR RAY 345.67 0.00 0 50
3501 PURBA BARDHAMAN Raina - I Burdwan Division NETRAKHANDA PIPED WATER SUPPLY SCHEME , SM/16616 New Material Requisition To Resource Division RTOR000037/2024-2025 317/BWD 15/01/2025 Resource Division 1.24 0.00 0 0
3502 PURBA BARDHAMAN Central Mechanical AUGMENTATION OF GROUND WATER BASED SAGRAI PWSS (PART B) , SM/16774 Augmentation New service connection charges for Sagrai W/S Scheme TW-3 BILL/00685/2023-2024 BP-2023-24-27 22/06/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 2.31 0.00 0 0
3503 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED SAGRAI PWSS (PART B) , SM/16774 Augmentation Construction of Pump House cum chlorine room without sanitary and water supply arrangement at Tube Well Site to departmental drawing no-PHE/BD/P.H/DRG/02/DEC-17(Size 3.60 mtr x 3.00 mtr room) for SAGRAI its Adjoining Mouza W/S Scheme, Block -Khandaghosh within Burdwan Sub-Division, PHE Dte. (Mouza- Jubila) ORD/000769/2022-2023 504/BSD 21/03/2023 45 JYOTI ENTERPRISE 3.50 2.76 78.86 100
3504 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED SAGRAI PWSS (PART B) , SM/16774 Augmentation Designing, Making and Erection of Sign Board for SAJAL GRAM in Sagrai Village, Khandaghosh Block within Sagrai PWSS under Burdwan Division, PHE Dte. (5 Nos Board) AE(HQs) J.E. 1 BURDWAN ORD/000737/2023-2024 830/AE/HQ 30/10/2023 30 ISHAN CONSTRUCTION 0.76 0.36 47.37 100
3505 PURBA BARDHAMAN Central Mechanical AUGMENTATION OF GROUND WATER BASED SAGRAI PWSS (PART B) , SM/16774 Augmentation Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination system and internal House wiring for Tube well no.- 1 & 2 at Augmentation of SAGRAI(Part-B)[KHANDAGHOSH] Water Supply Scheme under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER Junior Engineer ORD/000572/2023-2024 3898/CMD 18/08/2023 30 M/S, S.S. ENTERPRISE. 24.41 11.42 46.78 40
3506 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED SAGRAI PWSS (PART B) , SM/16774 Augmentation Repairing damaged concrete road by cement concrete (mix 1:1.5:3) for FHTC work for SAGRAI Piped W/S. Scheme and its adj. mouzas within Khandaghosh Block under Burdwan Division PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/001056/2023-2024 895/BWD 01/03/2024 30 SK KHAIRUL ISLAM 8.78 0.00 0 100
3507 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED SAGRAI PWSS (PART B) , SM/16774 Augmentation Sinking of 300 X 200mm dia Tube Well 150 mtr. Depth by D.R. Rig method using UPVC pipe (CD) and UPVC Deep Well Screen (RDS) for Aug. of SAGRAI W/S Scheme (2ND TW SITE) under Khandaghosh Block within Burdwan Sub-Division, PHE Dte. [For 01 No. Tube well]. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000191/2023-2024 2688/BWD 08/06/2023 30 NATIONAL CONSTRUCTION 13.23 0.00 0 100
3508 PURBA BARDHAMAN Central Mechanical AUGMENTATION OF GROUND WATER BASED SAGRAI PWSS (PART B) , SM/16774 Augmentation Quotation for new service connection for Sagrai PWSS TW-4. BILL/00256/2024-2025 BP-2024-25-135 05/06/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.68 0.00 0 0
3509 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED SAGRAI PWSS (PART B) , SM/16774 Augmentation Shifting of pipeline of 160mm & 90mm HDPE pipeline for Irrigation canel crossing and special maintenance for FHTC work for Sagrai & Khandaghosh Piped Water Supply Scheme within Khandaghosh block under Burdwan Division, PHE Dte. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000127/2024-2025 1008/BSD 06/06/2024 30 SHUBHRA KANTI GHOSH 0.86 0.00 0 100
3510 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED SAGRAI PWSS (PART B) , SM/16774 Augmentation Laying of Rising main in between 3rd Tube Wells to 125 mm dia distribution pipe line at Chatimpur village for SAGRAI Pipe Water Supply scheme in Khandaghosh Block under Burdwan Sub-Division under Burdwan Division, P.H.E. Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/001091/2023-2024 516/BSD 13/03/2024 30 SHANKHA GHOSH 0.97 0.00 0 100
3511 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED SAGRAI PWSS (PART B) , SM/16774 Augmentation Restore of Pipeline damaded by construction of drain by Zilla Parishad near Jobila F.P.School & Peer Tala & Chatimpur under SAGRAI Piped Water Supply Scheme, Block- Khandaghosh within Burdwan Sub Division under Burdwan Division PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/001177/2023-2024 534/BSD 14/03/2024 30 SHUBHRA KANTI GHOSH 0.94 0.00 0 100
3512 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED SAGRAI PWSS (PART B) , SM/16774 Augmentation Replacement of Tube-well & Rising main at HEAD TW SITE, 2ND TW site, 3rd TW site for Khandaghosh PWSS, HEAD TW SITE for Sagrai PWSS, HEAD TW SITE for SANKARI Piped Water Supply Scheme under Khandaghosh Block, District:- Purba-Bardhaman. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000438/2024-2025 3077/BWD 09/08/2024 120 ANIRUDDHA FARUQUE 80.21 26.91 33.55 80
3513 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED SAGRAI PWSS (PART B) , SM/16774 Augmentation Restore of Pipeline damaged by construction of drain by Zilla Parishad near Jobila Sarkarpara under SAGRAI Piped Water Supply Scheme, Block- Khandaghosh within Burdwan Sub Division under Burdwan Division PHE Dte Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/001172/2023-2024 531/BSD 14/03/2024 30 SHUBHRA KANTI GHOSH 0.96 0.29 30.21 100
3514 PURBA BARDHAMAN Central Mechanical AUGMENTATION OF GROUND WATER BASED SAGRAI PWSS (PART B) , SM/16774 Augmentation Illumination arrangement & different electro-mechanical works at SAGRAI water supply scheme under KHANDAGHOSH Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. ASSISTANT ENGINEER Junior Engineer ORD/000416/2024-2025 2800/CMD 01/10/2024 60 CHOUDHURY ENTERPRISE 14.29 0.00 0 0
3515 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED SAGRAI PWSS (PART B) , SM/16774 Augmentation Repairing damaged concrete road by Cement concrete (mix 1:1.5:3) and drainage system, Sluice valve chamber for FHTC work for KHANDAGHOSH, TARAPOSH, SAGRAI, SANKARI, KHUDKURI, ONARI PWSS and its adjoining mouzas within KHANDAGHOSH BLOCK under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000689/2024-2025 3684/BWD 23/10/2024 90 SUPRIYA RAY 115.68 0.00 0 0
3516 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED SAGRAI PWSS (PART B) , SM/16774 Augmentation Restore of Pipeline damaded by construction of drain by Zilla Parishad near Jobila Muslimpara under SAGRAI Piped Water Supply Scheme, Block- Khandaghosh within Burdwan Sub Division under Burdwan Division PHE Dte Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/001027/2023-2024 278/BSD 09/02/2024 30 SHUBHRA KANTI GHOSH 0.96 0.00 0 100
3517 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED SAGRAI PWSS (PART B) , SM/16774 Augmentation Beautification of PWSS with Arboriculture, Recharge Pit including shaft and anciliary works at SAGRAI (Khandaghosh Block) P.W.S.S under Burdwan Division, PHE Dte. Contractual Junior Engineer ORD/000551/2024-2025 282/RWS 03/09/2024 120 ALOKA CONSTRUCTION 0.97 0.00 0 100
3518 PURBA BARDHAMAN Memari - I Central Mechanical AMADPUR PIPED WATER SUPPLY SCHEME , SM/18146 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination system and internal House wiring for new Tube well no.- 1 & 2 of AMADPUR[MEMARI-I] Water Supply Scheme under CMD, PHE Dte., Dist.- Purba-Bardhaman. ORD/001089/2023-2024 4511/CMD 06/10/2023 30 AMUSAR IMPEX PVT. LTD. 25.20 0.00 0 0
3519 PURBA BARDHAMAN Memari - I Central Mechanical AMADPUR PIPED WATER SUPPLY SCHEME , SM/18146 New New service connection for Amadpur W/S Scheme. BILL/02187/2023-2024 BP-2023-24-383 16/01/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 5.47 0.00 0 0
3520 PURBA BARDHAMAN Memari - I Central Mechanical AMADPUR PIPED WATER SUPPLY SCHEME , SM/18146 New New service connection for Amadpur W/S Scheme. BILL/02188/2023-2024 BP-2023-24-382 16/01/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.69 0.00 0 0
3521 PURBA BARDHAMAN Memari - I Central Mechanical AMADPUR PIPED WATER SUPPLY SCHEME , SM/18146 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at SAHAPUR & others water supply scheme under Memari-I Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. ASSISTANT ENGINEER Junior Engineer ORD/000100/2024-2025 2392/CMD 02/08/2024 90 MITRA ENTERPRISE 47.62 0.00 0 0
3522 PURBA BARDHAMAN Memari - I Burdwan Division AMADPUR PIPED WATER SUPPLY SCHEME , SM/18146 New AMADPUR Piped Water Supply Scheme with sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of 200 cum capacity RCC OHRs with 20.0 mtr. Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site under MEMARI-I Block, District:- Purba Bardhaman [NEW SCHEME] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000569/2023-2024 4123/BWD 14/09/2023 365 SUPRIYA RAY 313.65 17.12 5.46 40
3523 PURBA BARDHAMAN Memari - I Burdwan Division AMADPUR PIPED WATER SUPPLY SCHEME , SM/18146 New Material Requisition To Resource Division RTOR000043/2024-2025 323/BWD 15/01/2025 Resource Division 9.23 0.00 0 0
3524 PURBA BARDHAMAN Memari - I Central Mechanical AMADPUR PIPED WATER SUPPLY SCHEME , SM/18146 New Additional quotation for new service connection at Amadpur PWSS BILL/01235/2024-2025 BP-2024-25-420 09/01/2025 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 6.20 0.00 0 0
3525 PURBA BARDHAMAN Katwa - I Burdwan Division GUSUMBA PIPED WATER SUPPLY SCHEME , SM/18441 New Material Requisition To Resource Division RTOR000271/2023-2024 2197/BWD 12/05/2023 Resource Division 13.48 0.00 0 0
3526 PURBA BARDHAMAN Katwa - I Burdwan Division GUSUMBA PIPED WATER SUPPLY SCHEME , SM/18441 New Material Requisition To Resource Division RTOR000539/2023-2024 4306/BWD 29/09/2023 Resource Division 72.67 0.00 0 0
3527 PURBA BARDHAMAN Katwa - I Central Mechanical GUSUMBA PIPED WATER SUPPLY SCHEME , SM/18441 New NEW SERVICE CONNECTION FOR GUSUMBA PWSS TW -1. BILL/03098/2023-2024 BP-2023-24-638 15/03/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 8.88 0.00 0 0
3528 PURBA BARDHAMAN Katwa - I Central Mechanical GUSUMBA PIPED WATER SUPPLY SCHEME , SM/18441 New NEW SERVICE CONNECTION FOR GUSUMBA PWSS TW-3 BILL/00129/2024-2025 BP-2024-25-60 26/04/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.93 0.00 0 0
3529 PURBA BARDHAMAN Katwa - I Central Mechanical GUSUMBA PIPED WATER SUPPLY SCHEME , SM/18441 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Jajigram & others water supply scheme under Katwa-I Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman Driller In-Charge Junior Engineer ORD/000069/2024-2025 2399/CMD 02/08/2024 90 SUBRATA BHADRA 55.16 0.00 0 0
3530 PURBA BARDHAMAN Katwa - I Central Mechanical GUSUMBA PIPED WATER SUPPLY SCHEME , SM/18441 New Quotation for new service connection at Gusumba PWSS, PH-2. BILL/00463/2024-2025 BP-2024-25-251 01/08/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.55 0.00 0 0
3531 PURBA BARDHAMAN Katwa - I Burdwan Division GUSUMBA PIPED WATER SUPPLY SCHEME , SM/18441 New Balance work of OHR, construction concrete Road, Functional Household Tap Connection, Construction of drain, Road restoration etc. for GOSUMBA PWSS, under KATWA-I Block under Katwa Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer ORD/000678/2024-2025 3622/BWD 03/10/2024 90 MA KANKALI ENTERPRISE 67.86 0.00 0 0
3532 PURBA BARDHAMAN Katwa - I Central Mechanical GUSUMBA PIPED WATER SUPPLY SCHEME , SM/18441 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1, 2 & 3 at GUSUMBA Water Supply Scheme [ Block- KATWA-1 ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. Driller In-Charge Junior Engineer ORD/000863/2023-2024 4130/CMD 29/08/2023 30 S.P. CONSTRUCTION 44.39 0.00 0 31
3533 PURBA BARDHAMAN Katwa - I Burdwan Division GUSUMBA PIPED WATER SUPPLY SCHEME , SM/18441 New Material Requisition To Resource Division RTOR000077/2024-2025 403/BWD 17/01/2025 Resource Division 7.60 0.00 0 0
3534 PURBA BARDHAMAN Katwa - I Burdwan Division GUSUMBA PIPED WATER SUPPLY SCHEME , SM/18441 New GUSUMBA Piped Water Supply Scheme with sinking of Tube-well, LDS, Rising Main, FHTC, Construction of 600 cum capacity RCC OHR with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drain and internal pathway at different TW site under Katwa-I Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer JUNIOR ENGINEER KATWA SUB-DIVISION PHE DTE ORD/000427/2023-2024 3325/BWD 02/08/2023 791 NATIONAL CONSTRUCTION 766.99 0.00 0 48
3535 PURBA BARDHAMAN Manteswar Burdwan Division Detailed Project Report of Ground Water Supply Based Piped Water Supply Scheme For MIRGHAR PWSS in Manteshwar Block of Purab Burdwan District under Burdwan Division, PHE Dte. , SM/18365 New Material Requisition To Resource Division RTOR000357/2023-2024 2197/BWD 12/05/2023 Resource Division 19.80 0.00 0 0
3536 PURBA BARDHAMAN Manteswar Central Mechanical Detailed Project Report of Ground Water Supply Based Piped Water Supply Scheme For MIRGHAR PWSS in Manteshwar Block of Purab Burdwan District under Burdwan Division, PHE Dte. , SM/18365 New New service connection charges for Mirghar PWSS TW-2 BILL/01368/2023-2024 BP-2023-24-134 24/08/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 6.42 0.00 0 0
3537 PURBA BARDHAMAN Manteswar Central Mechanical Detailed Project Report of Ground Water Supply Based Piped Water Supply Scheme For MIRGHAR PWSS in Manteshwar Block of Purab Burdwan District under Burdwan Division, PHE Dte. , SM/18365 New New service connection charges for Mirghar PWSS TW-3 BILL/01369/2023-2024 BP-2023-24-135 24/08/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.29 0.00 0 0
3538 PURBA BARDHAMAN Manteswar Burdwan Division Detailed Project Report of Ground Water Supply Based Piped Water Supply Scheme For MIRGHAR PWSS in Manteshwar Block of Purab Burdwan District under Burdwan Division, PHE Dte. , SM/18365 New Material Requisition To Resource Division RTOR000461/2023-2024 3985/BWD 08/09/2023 Resource Division 262.83 0.00 0 0
3539 PURBA BARDHAMAN Manteswar Central Mechanical Detailed Project Report of Ground Water Supply Based Piped Water Supply Scheme For MIRGHAR PWSS in Manteshwar Block of Purab Burdwan District under Burdwan Division, PHE Dte. , SM/18365 New Supply and delivery of Stationary items for the official works related with Mirghar and differents water supply scheme under JJM Programme for Central Mechanical Division and its subordinate offices of P.H.E. Dte. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/001033/2023-2024 702/CMSD 17/08/2023 10 BURDWAN DISTRICT CENTRAL SERVICE CUM MARKETING INDUSTRIAL CO-OPARETIVE UNION LTD 0.74 0.74 100 100
3540 PURBA BARDHAMAN Manteswar Central Mechanical Detailed Project Report of Ground Water Supply Based Piped Water Supply Scheme For MIRGHAR PWSS in Manteshwar Block of Purab Burdwan District under Burdwan Division, PHE Dte. , SM/18365 New NEW SERVICE CONNECTION FOR MIRGHAR PWSS BILL/02591/2023-2024 BP-2023-24-552 20/02/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 7.80 0.00 0 0
3541 PURBA BARDHAMAN Manteswar Central Mechanical Detailed Project Report of Ground Water Supply Based Piped Water Supply Scheme For MIRGHAR PWSS in Manteshwar Block of Purab Burdwan District under Burdwan Division, PHE Dte. , SM/18365 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1,2, 3 & 4 at MIRGHAR Water Supply Scheme [ Block- MONTESWAER] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000467/2023-2024 3724/CMD 08/08/2023 30 P.K. ENGINEERING 59.87 12.04 20.11 75
3542 PURBA BARDHAMAN Manteswar Central Mechanical Detailed Project Report of Ground Water Supply Based Piped Water Supply Scheme For MIRGHAR PWSS in Manteshwar Block of Purab Burdwan District under Burdwan Division, PHE Dte. , SM/18365 New continuation order Hiring of Inspection Vehicle (Diesel/CNG/LPG Driven) for supervision of site for the office of Assistant Engineer, under C.M.D. P.H.E. Dte. w.e.f.- 01/01/2024 to 29/02/2024. [Under JJM Works] ASSISTANT ENGINEER Junior Engineer ORD/001636/2023-2024 1240/CMSD 31/12/2023 60 SUBRATA BHADRA 0.79 0.00 0 100
3543 PURBA BARDHAMAN Manteswar Burdwan Division Detailed Project Report of Ground Water Supply Based Piped Water Supply Scheme For MIRGHAR PWSS in Manteshwar Block of Purab Burdwan District under Burdwan Division, PHE Dte. , SM/18365 New MIRGAHAR Piped Water Supply Scheme with sinking of Tube-well, LDS, Rising Main, FHTC, Construction of 700 cum capacity RCC OHR with 20.0 mtr. with Staging height including soil investigation & construction of switch-rooms & boundary walls and land development, drain and internal pathway at different TW site under Monteswar Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000374/2023-2024 3104/BWD 19/07/2023 365 M/S S. CHOUDHURY 929.46 184.76 19.88 60
3544 PURBA BARDHAMAN Manteswar Burdwan Division Detailed Project Report of Ground Water Supply Based Piped Water Supply Scheme For MIRGHAR PWSS in Manteshwar Block of Purab Burdwan District under Burdwan Division, PHE Dte. , SM/18365 New Different types of works in connection with implementation of MIRGAHAR Piped Water Supply Scheme (SM/18365) & BAGPUR PWSS (SM/13323) under Kalna Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000186/2024-2025 2400/BWD 26/06/2024 120 M/S S. CHOUDHURY 301.24 42.82 14.21 60
3545 PURBA BARDHAMAN Manteswar Central Mechanical Detailed Project Report of Ground Water Supply Based Piped Water Supply Scheme For MIRGHAR PWSS in Manteshwar Block of Purab Burdwan District under Burdwan Division, PHE Dte. , SM/18365 New Supply and installation of Electro-Magnetic flow meter at AURIA, KARUI & others water supply scheme under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. Driller In-Charge JUNIOR ENGINEER ORD/000602/2024-2025 3106/CMD 11/12/2024 60 S.K. ELECTRICALS 13.60 0.00 0 0
3546 PURBA BARDHAMAN Manteswar Central Mechanical Detailed Project Report of Ground Water Supply Based Piped Water Supply Scheme For MIRGHAR PWSS in Manteshwar Block of Purab Burdwan District under Burdwan Division, PHE Dte. , SM/18365 New Supply and installation of Electro-Magnetic flow meter at Bazar Mahammadpur, Dhatrigram, Arjunpukur & others water supply scheme under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000590/2024-2025 3105/CMD 11/12/2024 60 SHREE BISHNU CONSTRUCTION 19.77 0.00 0 0
3547 PURBA BARDHAMAN Manteswar Central Mechanical Detailed Project Report of Ground Water Supply Based Piped Water Supply Scheme For MIRGHAR PWSS in Manteshwar Block of Purab Burdwan District under Burdwan Division, PHE Dte. , SM/18365 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Sutra & others water supply scheme under Monteswar Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000068/2024-2025 2396/CMD 02/08/2024 455 SINHA ELECTRICALS 78.06 0.00 0 20
3548 PURBA BARDHAMAN Katwa - I Burdwan Division KASIGRAM PIPE WATER SUPPLY SCHEME , SM/18367 New Material Requisition To Resource Division RTOR000318/2023-2024 2197/BWD 12/05/2023 Resource Division 11.67 0.00 0 0
3549 PURBA BARDHAMAN Katwa - I Burdwan Division KASIGRAM PIPE WATER SUPPLY SCHEME , SM/18367 New Material Requisition To Resource Division RTOR000431/2023-2024 3855/BWD 01/09/2023 Resource Division 68.67 0.00 0 0
3550 PURBA BARDHAMAN Katwa - I Central Mechanical KASIGRAM PIPE WATER SUPPLY SCHEME , SM/18367 New New service connection for Kashigram PWSS PH-2. BILL/02908/2023-2024 BP-2023-24-617 07/03/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 1.06 0.00 0 0
3551 PURBA BARDHAMAN Katwa - I Central Mechanical KASIGRAM PIPE WATER SUPPLY SCHEME , SM/18367 New New service connection for Kasigram PWSS PH-1. BILL/02909/2023-2024 BP-2023-24-616 07/03/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 4.69 0.00 0 0
3552 PURBA BARDHAMAN Katwa - I Central Mechanical KASIGRAM PIPE WATER SUPPLY SCHEME , SM/18367 New New service connection for Kasigram PWSS PH-3. BILL/02907/2023-2024 BP-2023-24-618 07/03/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 2.73 0.00 0 0
3553 PURBA BARDHAMAN Katwa - I Central Mechanical KASIGRAM PIPE WATER SUPPLY SCHEME , SM/18367 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Jajigram & others water supply scheme under Katwa-I Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman Driller In-Charge Junior Engineer ORD/000069/2024-2025 2399/CMD 02/08/2024 90 SUBRATA BHADRA 55.16 0.00 0 0
3554 PURBA BARDHAMAN Katwa - I Burdwan Division KASIGRAM PIPE WATER SUPPLY SCHEME , SM/18367 New Material Requisition To Resource Division RTOR000020/2024-2025 4104/BWD 25/11/2024 Resource Division 6.95 0.00 0 0
3555 PURBA BARDHAMAN Katwa - I Burdwan Division KASIGRAM PIPE WATER SUPPLY SCHEME , SM/18367 New Different works related (sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of different capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site) to BAGHTONA, & KASIGRAM Piped Water Supply Scheme under Katwa ¿ I Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer JUNIOR ENGINEER KATWA SUB-DIVISION PHE DTE ORD/000390/2023-2024 3199/BWD 24/07/2023 527 MANASH GHOSH 1,161.82 216.20 18.61 95
3556 PURBA BARDHAMAN Katwa - I Central Mechanical KASIGRAM PIPE WATER SUPPLY SCHEME , SM/18367 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1, 2 & 3 at KASIGRAM Water Supply Scheme [ Block-KATWA-1 ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. Driller In-Charge Junior Engineer ORD/000881/2023-2024 4144/CMD 29/08/2023 492 M/S. SWAPAN BANERJEE 45.09 1.65 3.66 90
3557 PURBA BARDHAMAN Raina - I Burdwan Division SANKARPUR PIPED WATER SUPPLY SCHEME , SM/18337 New Material Requisition To Resource Division RTOR000280/2023-2024 2197/BWD 12/05/2023 Resource Division 6.97 0.00 0 0
3558 PURBA BARDHAMAN Raina - I Burdwan Division SANKARPUR PIPED WATER SUPPLY SCHEME , SM/18337 New Material Requisition To Resource Division RTOR000427/2023-2024 3858/BWD 01/09/2023 Resource Division 2.13 0.00 0 0
3559 PURBA BARDHAMAN Raina - I Burdwan Division SANKARPUR PIPED WATER SUPPLY SCHEME , SM/18337 New Material Requisition To Resource Division RTOR000691/2023-2024 5066/BWD 23/11/2023 Resource Division 20.46 0.00 0 0
3560 PURBA BARDHAMAN Raina - I Central Mechanical SANKARPUR PIPED WATER SUPPLY SCHEME , SM/18337 New New service connection for Shankarpur PWSS TW-1. BILL/02279/2023-2024 BP-2023-24-436 29/01/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.32 0.00 0 0
3561 PURBA BARDHAMAN Raina - I Central Mechanical SANKARPUR PIPED WATER SUPPLY SCHEME , SM/18337 New NEW SERVICE CONNECTION FOR SANKARPUR PWSS TW 2. BILL/03181/2023-2024 BP-2023-24-665 22/03/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.26 0.00 0 0
3562 PURBA BARDHAMAN Raina - I Central Mechanical SANKARPUR PIPED WATER SUPPLY SCHEME , SM/18337 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Bajitpur, Belsar & other water supply scheme under Raina-1 Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000117/2024-2025 2589/CMD 27/08/2024 90 DEY ENTERPRISE 74.58 0.00 0 0
3563 PURBA BARDHAMAN Raina - I Burdwan Division SANKARPUR PIPED WATER SUPPLY SCHEME , SM/18337 New Restoration work of Sankarpur - Nibhuji bazar Road from 13.80 km to 15.75km. damaged due to laying of underground water pipe line by PHE with box cutting and Jhama with moorum consolidation under Kalna Highway sub Division of Burdwan south Highway Division P.W(Roads) Dte . During the year 2023-24 BILL/00644/2024-2025 825/JJM 13/09/2024 EXECUTIVE ENGINEER BURDWAN SOUTH HIGHWAY DIVISION P.W. (ROADS) DTE. 3.34 0.00 0 null
3564 PURBA BARDHAMAN Raina - I Central Mechanical SANKARPUR PIPED WATER SUPPLY SCHEME , SM/18337 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at Sankarpur Water Supply Scheme [ Block- Raina-1 ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000723/2023-2024 4034/CMD 29/08/2023 30 GOENKA ENTERPRISE 29.40 0.00 0 95
3565 PURBA BARDHAMAN Raina - I Burdwan Division SANKARPUR PIPED WATER SUPPLY SCHEME , SM/18337 New Material Requisition To Resource Division RTOR000022/2024-2025 302/BWD 15/01/2025 Resource Division 13.08 0.00 0 0
3566 PURBA BARDHAMAN Raina - I Burdwan Division SANKARPUR PIPED WATER SUPPLY SCHEME , SM/18337 New Balance work [i.e. Extension or parallel Pipeline, Leftout FHTC, Road Restoration work, Sinking of Additional Tube Well with Pump House & Boundary wall, inter Connection of Additional Tube Well, Construction of M.S.Structural bridge, canal Crossing, MS casing with allied work of Bhagabatipur, Machkhara, Udgara, Bantir, Chakpurohit Rasuikhanda, Sankarpur, Gopalpur & Belshar PWSS Block-RAINA- I under Burdwan Sub Division, PHE Dte. within Burdwan Division PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/001103/2024-2025 469/BWD 24/01/2025 180 SK ALIM 1,353.91 0.00 0 0
3567 PURBA BARDHAMAN Raina - I Burdwan Division SANKARPUR PIPED WATER SUPPLY SCHEME , SM/18337 New Different works related (sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of different capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site) to BELSHAR & SANKARPUR Piped Water Supply Scheme under Raina ¿ I Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000411/2023-2024 3256/BWD 27/07/2023 644 SK ALIM 1,345.74 0.00 0 85
3568 PURBA BARDHAMAN Katwa - I Burdwan Division BAGHTONA PIPED WATER SUPPLY SCHEME , SM/18334 New Material Requisition To Resource Division RTOR000215/2023-2024 2155/BWD 10/05/2023 Resource Division 1.33 0.00 0 0
3569 PURBA BARDHAMAN Katwa - I Burdwan Division BAGHTONA PIPED WATER SUPPLY SCHEME , SM/18334 New Material Requisition To Resource Division RTOR000432/2023-2024 3854/BWD 01/09/2023 Resource Division 39.78 0.00 0 0
3570 PURBA BARDHAMAN Katwa - I Central Mechanical BAGHTONA PIPED WATER SUPPLY SCHEME , SM/18334 New Additional Quotation for new service connection charges for Baghtona PWSS TW-1 BILL/01421/2023-2024 BP-2023-24-145 31/08/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 2.90 0.00 0 0
3571 PURBA BARDHAMAN Katwa - I Central Mechanical BAGHTONA PIPED WATER SUPPLY SCHEME , SM/18334 New New service connection charges for Baghtona PWSS TW-1 BILL/01422/2023-2024 BP-2023-24-149 01/09/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 0.36 0.00 0 0
3572 PURBA BARDHAMAN Katwa - I Central Mechanical BAGHTONA PIPED WATER SUPPLY SCHEME , SM/18334 New Additional quotation for Baghtona PWSS TW-1 BILL/01543/2023-2024 BP-2023-24-210 01/11/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 0.00 0.00 NAN 0
3573 PURBA BARDHAMAN Katwa - I Central Mechanical BAGHTONA PIPED WATER SUPPLY SCHEME , SM/18334 New NEW SERVICE CONNECTION FOR BAGHTONA PWSS TW-2 BILL/00127/2024-2025 BP-2024-25-61 26/04/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 7.01 0.00 0 0
3574 PURBA BARDHAMAN Katwa - I Central Mechanical BAGHTONA PIPED WATER SUPPLY SCHEME , SM/18334 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Jajigram & others water supply scheme under Katwa-I Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman Driller In-Charge Junior Engineer ORD/000069/2024-2025 2399/CMD 02/08/2024 90 SUBRATA BHADRA 55.16 0.00 0 0
3575 PURBA BARDHAMAN Katwa - I Burdwan Division BAGHTONA PIPED WATER SUPPLY SCHEME , SM/18334 New Material Requisition To Resource Division RTOR000019/2024-2025 4105/BWD 25/11/2024 Resource Division 11.50 0.00 0 0
3576 PURBA BARDHAMAN Katwa - I Burdwan Division BAGHTONA PIPED WATER SUPPLY SCHEME , SM/18334 New Different works related (sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of different capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site) to BAGHTONA, & KASIGRAM Piped Water Supply Scheme under Katwa ¿ I Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer JUNIOR ENGINEER KATWA SUB-DIVISION PHE DTE ORD/000390/2023-2024 3199/BWD 24/07/2023 527 MANASH GHOSH 1,161.82 356.09 30.65 95
3577 PURBA BARDHAMAN Katwa - I Central Mechanical BAGHTONA PIPED WATER SUPPLY SCHEME , SM/18334 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at BAGHTONA Water Supply Scheme [ Block- KATWA-I ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. Driller In-Charge Junior Engineer ORD/000597/2023-2024 3954/CMD 24/08/2023 615 SOUNAK ENTERPRISE 28.48 0.00 0 44
3578 PURBA BARDHAMAN Katwa - I Burdwan Division BAINCHI PIPED WATER SUPPLY SCHEME , SM/18335 New Material Requisition To Resource Division RTOR000219/2023-2024 2155/BWD 10/05/2023 Resource Division 13.10 0.00 0 0
3579 PURBA BARDHAMAN Katwa - I Burdwan Division BAINCHI PIPED WATER SUPPLY SCHEME , SM/18335 New Material Requisition To Resource Division RTOR000506/2023-2024 4030/BWD 08/09/2023 Resource Division 46.22 0.00 0 0
3580 PURBA BARDHAMAN Katwa - I Central Mechanical BAINCHI PIPED WATER SUPPLY SCHEME , SM/18335 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at BAINCHI Water Supply Scheme [ Block- KATWA-I ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. Driller In-Charge Junior Engineer ORD/000885/2023-2024 4148/CMD 29/08/2023 30 M/S, S.S. ENTERPRISE. 30.35 0.00 0 0
3581 PURBA BARDHAMAN Katwa - I Central Mechanical BAINCHI PIPED WATER SUPPLY SCHEME , SM/18335 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Jajigram & others water supply scheme under Katwa-I Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman Driller In-Charge Junior Engineer ORD/000069/2024-2025 2399/CMD 02/08/2024 90 SUBRATA BHADRA 55.16 0.00 0 0
3582 PURBA BARDHAMAN Katwa - I Central Mechanical BAINCHI PIPED WATER SUPPLY SCHEME , SM/18335 New New service connection charges for Bainchi PWSS TW-2 BILL/00827/2024-2025 BP-2024-25-324 03/10/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 2.75 0.00 0 0
3583 PURBA BARDHAMAN Katwa - I Central Mechanical BAINCHI PIPED WATER SUPPLY SCHEME , SM/18335 New New service connection charges for Bainchi PWSS TW-1 BILL/00826/2024-2025 BP-2024-25-325 03/10/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 8.89 0.00 0 0
3584 PURBA BARDHAMAN Katwa - I Burdwan Division BAINCHI PIPED WATER SUPPLY SCHEME , SM/18335 New Material Requisition To Resource Division RTOR000080/2024-2025 406/BWD 17/01/2025 Resource Division 2.00 0.00 0 0
3585 PURBA BARDHAMAN Katwa - I Burdwan Division BAINCHI PIPED WATER SUPPLY SCHEME , SM/18335 New Repairing of pipe line those damaged during flood like situation at Kamal village at Baichi PWSS under Katwa Sub-Division, Block- Katwa - I , Burdwan Division Phe Dte. (Sl No -3) Assistant Engineer Junior Engineer, R.W.S., Katwa-I Dev. Block ORD/001050/2024-2025 1607/KTS 14/11/2024 45 MAA ENGINEERS CO. OPERATIVE & CONSTRUCTION SOCIETY LTD. 0.85 0.00 0 0
3586 PURBA BARDHAMAN Katwa - I Burdwan Division BAINCHI PIPED WATER SUPPLY SCHEME , SM/18335 New Repairing of pipe line those damaged during flood like situation at Chandrapur village at Baichi PWSS under Katwa Sub-Division, Block- Katwa - I , Burdwan Division Phe Dte. (Sl No -2) Assistant Engineer Junior Engineer, R.W.S., Katwa-I Dev. Block ORD/001049/2024-2025 1606/KTS 14/11/2024 45 MAA ENGINEERS CO. OPERATIVE & CONSTRUCTION SOCIETY LTD. 0.86 0.00 0 0
3587 PURBA BARDHAMAN Katwa - I Burdwan Division BAINCHI PIPED WATER SUPPLY SCHEME , SM/18335 New Repairing of pipe line those damaged during flood like situation at Jamra village at Baichi PWSS under Katwa Sub-Division, Block- Katwa - I , Burdwan Division Phe Dte. (Sl No -4) Assistant Engineer Junior Engineer, R.W.S., Katwa-I Dev. Block ORD/001051/2024-2025 1608/KTS 14/11/2024 45 MAA ENGINEERS CO. OPERATIVE & CONSTRUCTION SOCIETY LTD. 0.73 0.00 0 0
3588 PURBA BARDHAMAN Katwa - I Burdwan Division BAINCHI PIPED WATER SUPPLY SCHEME , SM/18335 New BAINCHI Piped Water Supply Scheme with sinking of Tube-well, LDS, Rising Main, FHTC, Construction of 400 cum capacity RCC OHR with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drain and internal pathway at different TW site under Katwa-I Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer JUNIOR ENGINEER KATWA SUB-DIVISION PHE DTE,Junior Engineer, R.W.S., Katwa-I Dev. Block ORD/000486/2023-2024 3503/BWD 10/08/2023 510 MAA ENGINEERS CO. OPERATIVE & CONSTRUCTION SOCIETY LTD. 521.70 0.00 0 65
3589 PURBA BARDHAMAN Katwa - I Burdwan Division BAINCHI PIPED WATER SUPPLY SCHEME , SM/18335 New Emmergent LDS work for continuation of pipe line between Chandrapur and Kamal by laying of 200 mm dia. Di pipe and other ancillary work under BAINCHI PWSS (SM/18335) under Katwa-I Block, District:- Purba-Bardhaman Assistant Engineer ORD/001318/2024-2025 984/BWD 13/03/2025 30 BABLU KUMAR MONDAL 9.24 0.00 0 0
3590 PURBA BARDHAMAN Ausgram - II Burdwan Division BARADOBA PIPED WATER SUPPLY SCHEME , SM/18230 New Material Requisition To Resource Division RTOR000233/2023-2024 2197/BWD 12/05/2023 Resource Division 11.17 0.00 0 0
3591 PURBA BARDHAMAN Ausgram - II Central Mechanical BARADOBA PIPED WATER SUPPLY SCHEME , SM/18230 New New service connection charges for Baradoba PWSS TW-1 BILL/01349/2023-2024 BP-2023-24-129 21/08/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 4.34 0.00 0 0
3592 PURBA BARDHAMAN Ausgram - II Burdwan Division BARADOBA PIPED WATER SUPPLY SCHEME , SM/18230 New Material Requisition To Resource Division RTOR000438/2023-2024 3849/BWD 01/09/2023 Resource Division 1.22 0.00 0 0
3593 PURBA BARDHAMAN Ausgram - II Burdwan Division BARADOBA PIPED WATER SUPPLY SCHEME , SM/18230 New Material Requisition To Resource Division RTOR000612/2023-2024 4933/BWD 10/11/2023 Resource Division 16.68 0.00 0 0
3594 PURBA BARDHAMAN Ausgram - II Central Mechanical BARADOBA PIPED WATER SUPPLY SCHEME , SM/18230 New New service connection charges for Baradoba PWSS TW-2 BILL/01825/2023-2024 BP-2023-24-334 03/01/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 5.77 0.00 0 0
3595 PURBA BARDHAMAN Ausgram - II Central Mechanical BARADOBA PIPED WATER SUPPLY SCHEME , SM/18230 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Chora, Kalaijhuti & others water supply scheme under Ausgram-2 Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. Driller In-Charge JUNIOR ENGINEER ORD/000143/2024-2025 2405/CMD 02/08/2024 90 NABAUDYOG ELECTRICAL ENGINEERING CO-OPERATIVE SOCIETY LTD 95.26 0.00 0 0
3596 PURBA BARDHAMAN Ausgram - II Durgapur W/S Division BARADOBA PIPED WATER SUPPLY SCHEME , SM/18230 New Acceptance cum Formal Work Order for BARADOBA Piped Water Supply Scheme with FHTC ,Road restoration under AUSGRAM-II Block, District:- Purba-Bardhaman under Durgapur W/S Division, PHE Dte Assistant Engineer-I Contractual Junior Engineer_4 ORD/000173/2024-2025 1619/DWSD 26/11/2024 60 SAIKAT RAY 15.24 0.00 0 0
3597 PURBA BARDHAMAN Ausgram - II Durgapur W/S Division BARADOBA PIPED WATER SUPPLY SCHEME , SM/18230 New Material Requisition To Resource Division RTOR000008/2024-2025 1724/R/DWSD 10/12/2024 Resource Division 0.77 0.00 0 0
3598 PURBA BARDHAMAN Ausgram - II Central Mechanical BARADOBA PIPED WATER SUPPLY SCHEME , SM/18230 New Supply & Installation of Submersible Pumping Machinery , Voltage Stabilizer, Chlorination system and internal House wiring for Tube well no.- 1 & 2 at BARADOBA Water Supply Scheme [Block - AUSGRAM-2] under CMD, PHE Dte., Dist.- Purba-Bardhaman. Driller In-Charge JUNIOR ENGINEER ORD/000449/2023-2024 3699/CMD 07/08/2023 999 M/S, S.DAS AND ENTERPRISE. 21.33 0.00 0 90
3599 PURBA BARDHAMAN Ausgram - II Burdwan Division BARADOBA PIPED WATER SUPPLY SCHEME , SM/18230 New BARADOBA Piped Water Supply Scheme with sinking of Tube-well, LDS, Rising Main, FHTC, construction of switch rooms & boundary walls with gates and land development, drain and internal pathway at different TW site under AUSHGRAM-II Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer ORD/000188/2023-2024 2677/BWD 08/06/2023 446 THREE MAA ENTERPRISE 109.10 40.20 36.85 100
3600 PURBA BARDHAMAN Ausgram - II Durgapur W/S Division BARADOBA PIPED WATER SUPPLY SCHEME , SM/18230 New Material Requisition To Resource Division RTOR000042/2024-2025 462/DWSD 17/03/2025 Resource Division 0.14 0.00 0 0
3601 PURBA BARDHAMAN Burdwan - I,Khandaghosh Burdwan Division NALA PIPED WATER SUPPLY SCHEME , SM/18256 New Material Requisition To Resource Division RTOR000396/2023-2024 2197/BWD 12/05/2023 Resource Division 17.83 0.00 0 0
3602 PURBA BARDHAMAN Burdwan - I,Khandaghosh Burdwan Division NALA PIPED WATER SUPPLY SCHEME , SM/18256 New Material Requisition To Resource Division RTOR000412/2023-2024 3868/BWD 01/09/2023 Resource Division 3.83 0.00 0 0
3603 PURBA BARDHAMAN Burdwan - I,Khandaghosh Burdwan Division NALA PIPED WATER SUPPLY SCHEME , SM/18256 New Material Requisition To Resource Division RTOR000679/2023-2024 5054/BWD 23/11/2023 Resource Division 20.46 0.00 0 0
3604 PURBA BARDHAMAN Burdwan - I,Khandaghosh Central Mechanical NALA PIPED WATER SUPPLY SCHEME , SM/18256 New New service connection at NALA PWSS Ph-2 BILL/02328/2023-2024 BP-2023-24-445 29/01/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.37 0.00 0 0
3605 PURBA BARDHAMAN Burdwan - I,Khandaghosh Central Mechanical NALA PIPED WATER SUPPLY SCHEME , SM/18256 New New service connection at NALA PWSS Ph-1 BILL/02327/2023-2024 BP-2023-24-444 29/01/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 5.20 0.00 0 0
3606 PURBA BARDHAMAN Burdwan - I,Khandaghosh Central Mechanical NALA PIPED WATER SUPPLY SCHEME , SM/18256 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at MALKITA & others water supply scheme under Bardhaman-I Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman ASSISTANT ENGINEER Junior Engineer ORD/000066/2024-2025 2388/CMD 02/08/2024 90 ELECTRICAL & MECHANICAL ENGINEERING CORPORATION 55.95 0.00 0 0
3607 PURBA BARDHAMAN Burdwan - I,Khandaghosh Central Mechanical NALA PIPED WATER SUPPLY SCHEME , SM/18256 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at Nala Water Supply Scheme [ Block- Burdwan-1 ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER Junior Engineer ORD/000659/2023-2024 4002/CMD 29/08/2023 528 P.K. ENGINEERING 28.89 0.00 0 95
3608 PURBA BARDHAMAN Burdwan - I,Khandaghosh Burdwan Division NALA PIPED WATER SUPPLY SCHEME , SM/18256 New Material Requisition To Resource Division RTOR000026/2024-2025 305/BWD 15/01/2025 Resource Division 1.97 0.00 0 0
3609 PURBA BARDHAMAN Burdwan - I,Khandaghosh Burdwan Division NALA PIPED WATER SUPPLY SCHEME , SM/18256 New Balance work i.e. Extension or parallel Pipeline, Leftout FHTC, Road Restoration work, Sinking of Additional Tube Well with Pump House & Boundary wall, Solar System with structure, inter Connection of Additional Tube Well, & allied work for NALA Piped Water Supply Scheme under Burdwan Sub Division, PHE Dte. within Burdwan Division PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/001266/2024-2025 847/BWD 05/03/2025 120 DIAMOND ENGINEERS CO-OP SOCIETY LTD. 184.95 0.00 0 0
3610 PURBA BARDHAMAN Burdwan - I,Khandaghosh Burdwan Division NALA PIPED WATER SUPPLY SCHEME , SM/18256 New NALA Piped Water Supply Scheme with sinking of Tube-well, LDS, Rising Main, FHTC, Construction of 400 cum capacity RCC OHR with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drain and internal pathway at different TW site under Burdwan-I Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000425/2023-2024 3327/BWD 02/08/2023 669 MD HASIN 752.05 0.00 0 75
3611 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED TALIT-SIMDAL PWSS TO ACCOMMODATE FHTC IN BURDWAN -I BLOCK UNDER BURDWAN SUB-DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/09566 Augmentation Supply of materials for different water supply scheme under Burdwan Division, PHE Dte. VCH/001578/2021-2022 1207/DW 10/03/2022 EXECUTIVE ENGINEER, RESOURCES DIVISION, P.H.E. DTE. 3,005.00 0.00 0 0
3612 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED TALIT-SIMDAL PWSS TO ACCOMMODATE FHTC IN BURDWAN -I BLOCK UNDER BURDWAN SUB-DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/09566 Augmentation Route Survey & Preparation of DPR for Talit-Simdal W/S Scheme under Burdwan-I Block under Burdwan Sub-Division under Burdwan Division PHE Dte. Sl No.8. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000496/2021-2022 183/BSD 31/01/2022 30 RADIANT 2.96 2.94 99.32 1
3613 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED TALIT-SIMDAL PWSS TO ACCOMMODATE FHTC IN BURDWAN -I BLOCK UNDER BURDWAN SUB-DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/09566 Augmentation Sinking of 300 X 200mm dia Tube Well 150 mtr. Depth by D.R. Rig method using UPVC pipe (CM) and UPVC Medium Well Screen (RMS) for Augmentation of TALIT-SIMDAL & its adjoining mouzas Piped Water Supply Scheme, Block - Burdwan - I, Dist - Purba Bardhaman under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000553/2022-2023 5195/BWD 24/11/2022 30 ANIRUDDHA FARUQUE 11.35 8.83 77.8 0
3614 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED TALIT-SIMDAL PWSS TO ACCOMMODATE FHTC IN BURDWAN -I BLOCK UNDER BURDWAN SUB-DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/09566 Augmentation Material Requisition To Resource Division RTOR000232/2021-2022 1556/BWD 15/03/2022 Resource Division 0.37 0.00 0 0
3615 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED TALIT-SIMDAL PWSS TO ACCOMMODATE FHTC IN BURDWAN -I BLOCK UNDER BURDWAN SUB-DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/09566 Augmentation Material Requisition To Resource Division RTOR000042/2021-2022 538/BWD 27/01/2022 Resource Division 20.19 0.00 0 0
3616 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED TALIT-SIMDAL PWSS TO ACCOMMODATE FHTC IN BURDWAN -I BLOCK UNDER BURDWAN SUB-DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/09566 Augmentation Material Requisition To Resource Division RTOR000088/2021-2022 880/BWD 11/02/2022 Resource Division 9.90 0.00 0 0
3617 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED TALIT-SIMDAL PWSS TO ACCOMMODATE FHTC IN BURDWAN -I BLOCK UNDER BURDWAN SUB-DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/09566 Augmentation Augmentation of TALIT-SIMDAL Piped Water Supply Scheme with LDS, Rising Main, Construction of 350 Cum capacity OHR with 20.0 Mtr. Staging height inclusive of soil test, Construction of boundary wall construction at Head work site & FHTC under Burdwan ¿ I Block, District - Purba Bardhaman. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. Junior Engineer, Burdwan Sadar Sub-Division ORD/000004/2022-2023 1876/BWD 05/04/2022 1117 M/S S.S. ENTERPRISE 576.42 333.86 57.92 85
3618 PURBA BARDHAMAN Bhatar Burdwan Division SANTOSHPUR PIPED WATER SUPPLY SCHEME , SM/18405 New Material Requisition To Resource Division RTOR000283/2023-2024 2197/BWD 12/05/2023 Resource Division 22.79 0.00 0 0
3619 PURBA BARDHAMAN Bhatar Central Mechanical SANTOSHPUR PIPED WATER SUPPLY SCHEME , SM/18405 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1, 2 & 3 at SANTOSHPUR Water Supply Scheme [ Block- BHATAR ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000783/2023-2024 4076/CMD 29/08/2023 30 SUNRISE ENGINEERING CORPORATION 41.68 0.00 0 0
3620 PURBA BARDHAMAN Bhatar Burdwan Division SANTOSHPUR PIPED WATER SUPPLY SCHEME , SM/18405 New Material Requisition To Resource Division RTOR000554/2023-2024 4949/BWD 10/11/2023 Resource Division 123.19 0.00 0 0
3621 PURBA BARDHAMAN Bhatar Central Mechanical SANTOSHPUR PIPED WATER SUPPLY SCHEME , SM/18405 New New service connection charges for Santoshpur PWSS TW-1 BILL/01732/2023-2024 BP-2023-24-261 07/12/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 8.42 0.00 0 0
3622 PURBA BARDHAMAN Bhatar Central Mechanical SANTOSHPUR PIPED WATER SUPPLY SCHEME , SM/18405 New Quotation for new electric service connection at Santoshpur PH NO.-2 BILL/01741/2023-2024 BP-2023-24-260 07/12/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 2.91 0.00 0 0
3623 PURBA BARDHAMAN Bhatar Central Mechanical SANTOSHPUR PIPED WATER SUPPLY SCHEME , SM/18405 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Karjana & others water supply scheme under Bhatar Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000067/2024-2025 2394/CMD 02/08/2024 90 AHALYA ENGINEERING WORKS 82.00 0.00 0 0
3624 PURBA BARDHAMAN Bhatar Burdwan Division SANTOSHPUR PIPED WATER SUPPLY SCHEME , SM/18405 New Continuation for the work of Supply of Inspection Vehicle for inspection of different JJM related (Schemes) works as and when required including supply of driver & fuel (minimum 8 Hours duty per day) and all taxes etc. for Durgapur Sub-Division under BurdwanDivision, P.H.E. Dte.consider 96.00 Km. run per day [Period NOV.'2024 to JAN.'2025] ORD/000847/2024-2025 886/DSD 21/10/2024 78 MD HASIN 1.00 0.00 0 0
3625 PURBA BARDHAMAN Bhatar Burdwan Division SANTOSHPUR PIPED WATER SUPPLY SCHEME , SM/18405 New SANTOSHPUR Piped Water Supply Scheme with sinking of Tube-well, LDS, Rising Main, FHTC, Construction of 600 cum capacity RCC OHR with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drain and internal pathway at different TW site under Bhatar Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer1, Durgapur Sub-Division, PHE Dte.,Junior Engineer2, Durgapur Sub-Division, PHE Dte. ORD/000422/2023-2024 3293/BWD 31/07/2023 365 M/S S. CHOUDHURY 810.21 0.00 0 60
3626 PURBA BARDHAMAN Bhatar Burdwan Division SANTOSHPUR PIPED WATER SUPPLY SCHEME , SM/18405 New Continuation for the work of Supply of Inspection Vehicle for inspection of different JJM related (Schemes) works as and when required including supply of driver & fuel (minimum 8 Hours duty per day) and all taxes etc. for Durgapur Sub-Division under Burdwan Division, P.H.E. Dte.consider 96.00 Km. run per day. [PeriodFebruary.'2025 to April'2025] ORD/001180/2024-2025 129/DSD 29/01/2025 78 MD HASIN 1.00 0.00 0 0
3627 PURBA BARDHAMAN Bhatar Burdwan Division SANTOSHPUR PIPED WATER SUPPLY SCHEME , SM/18405 New FIXING OF DISPLAY BOARD WITH M.S STRUCTURE CONTAINING SCHEME DESCRIPTION AT NASIGRAM PWSS AND OTHER SCHEMES (16 Nos) WITHIN BHATAR BLOCK UNDER BURDWAN DIVISION , PHE Dte. ORD/001423/2024-2025 311/DSD 21/02/2025 21 SHUBHRA KANTI GHOSH 1.39 0.00 0 0
3628 PURBA BARDHAMAN Raina - II Burdwan Division Bara Bainan Piped Water Supply Scheme , SM/18406 New Material Requisition To Resource Division RTOR000231/2023-2024 2155/BWD 10/05/2023 Resource Division 10.15 0.00 0 0
3629 PURBA BARDHAMAN Raina - II Burdwan Division Bara Bainan Piped Water Supply Scheme , SM/18406 New Material Requisition To Resource Division RTOR000232/2023-2024 2197/BWD 12/05/2023 Resource Division 10.15 0.00 0 0
3630 PURBA BARDHAMAN Raina - II Burdwan Division Bara Bainan Piped Water Supply Scheme , SM/18406 New Material Requisition To Resource Division RTOR000424/2023-2024 3838/BWD 01/09/2023 Resource Division 8.01 0.00 0 0
3631 PURBA BARDHAMAN Raina - II Central Mechanical Bara Bainan Piped Water Supply Scheme , SM/18406 New Quotation for new electric service connection at Bara Bainan PH NO.-1 BILL/01742/2023-2024 BP-2023-24-262 07/12/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.49 0.00 0 0
3632 PURBA BARDHAMAN Raina - II Burdwan Division Bara Bainan Piped Water Supply Scheme , SM/18406 New Continuation Work Order supply of inspection Vehicle for inspection of different JJM related(schemes)works as and when required including supply of driver & fuel(minimum 8 hours duty per day) and all taxes etc. for Burdwan Sub-Division under Burdwan Division,PHE Dte consider 96.00 Km. run per day (Period from 01-11-2023 to 31-01-2024) ORD/000985/2023-2024 2561/BSD 30/10/2023 66 MD HASIN 0.85 0.00 0 0
3633 PURBA BARDHAMAN Raina - II Burdwan Division Bara Bainan Piped Water Supply Scheme , SM/18406 New Material Requisition To Resource Division RTOR000788/2023-2024 320/BWD 24/01/2024 Resource Division 21.17 0.00 0 0
3634 PURBA BARDHAMAN Raina - II Central Mechanical Bara Bainan Piped Water Supply Scheme , SM/18406 New New service connection charges for Bara Bainan PWSS TW-2 BILL/02212/2023-2024 BP-2023-24-387 17/01/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 4.11 0.00 0 0
3635 PURBA BARDHAMAN Raina - II Central Mechanical Bara Bainan Piped Water Supply Scheme , SM/18406 New New Service connection at BARA BAINAN PWSS TW-1. BILL/02361/2023-2024 BP-2023-24-485 31/01/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 0.68 0.00 0 0
3636 PURBA BARDHAMAN Raina - II Burdwan Division Bara Bainan Piped Water Supply Scheme , SM/18406 New Supply of inspection Vehicle for inspection of different JJM related(schemes)works as and when required including supply of driver & fuel(minimum 8 hours duty per day) and all taxes etc. for Burdwan Sub-Division under Burdwan Division,PHE Dte consider 96.00 Km. run per day (Period from 01-02-2024 to 30-04-2024) Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/001181/2023-2024 188/BSD 31/01/2024 66 PARVIN BEGAM 0.85 0.00 0 97
3637 PURBA BARDHAMAN Raina - II Central Mechanical Bara Bainan Piped Water Supply Scheme , SM/18406 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Satinandi,Sanko & others water supply scheme under Galsi-1 Block ; Serpur, Uchalan & others water supply scheme under Raina-2 Block and maro, loapur & others water supply scheme under Galsi-2 block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000397/2024-2025 2751/CMD 24/09/2024 90 ORIENTAL ENGINEERING CO. 88.42 0.00 0 0
3638 PURBA BARDHAMAN Raina - II Central Mechanical Bara Bainan Piped Water Supply Scheme , SM/18406 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at Barabainan Water Supply Scheme [ Block- Raina-2 ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000725/2023-2024 4036/CMD 29/08/2023 30 S.K. ENTERPRISE 28.98 0.00 0 96
3639 PURBA BARDHAMAN Raina - II Central Mechanical Bara Bainan Piped Water Supply Scheme , SM/18406 New Installation of starter in the temporary Kisok and allied works for urgent FHTC at BOROBOINAN PUMP HOUSE NO. 2 (RAINA-02 BLOCK) W/s scheme under CMD PHE Dte. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000651/2024-2025 770/CMSD 21/05/2024 10 S.K. ENTERPRISE 1.00 0.00 0 100
3640 PURBA BARDHAMAN Raina - II Central Mechanical Bara Bainan Piped Water Supply Scheme , SM/18406 New Installation of starter in the temporary Kisok and allied works for urgent FHTC at BOROBOINAN PUMP HOUSE NO 1 (RAINA 02 BLOCK) w/s scheme under CMD,PHE ,Dte. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000653/2024-2025 769/CMSD 21/05/2024 10 S.K. ENTERPRISE 1.00 0.00 0 100
3641 PURBA BARDHAMAN Raina - II Burdwan Division Bara Bainan Piped Water Supply Scheme , SM/18406 New Different works related (sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of different capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site) to BARABAINAN & CHAUDANGA Piped Water Supply Scheme under Raina ¿ II Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000412/2023-2024 3257/BWD 27/07/2023 807 SK ALIM 1,144.16 39.80 3.48 55
3642 PURBA BARDHAMAN Burdwan Division Providing Functional House Hold Tap Connection (FHTC) by retrofitting within the command area of Sahapurr Piped Water Supply Scheme , SM/07201 Retrofitting Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Sahapur (Pt-A) village of Sahapur Piped Water Supply Scheme within Katwa Sub-Divn. under Burdwan Division, PHE. Dte. [Phase - I] [SL.No : 11A] (Agreement no. 500/BWD of 2020-21) Assistant Engineer ORD/000143/2020-2021 2608/BWD 04/08/2020 30 RAINBOW CONSTRUCTION 4.92 4.92 100 1
3643 PURBA BARDHAMAN Burdwan Division Providing Functional House Hold Tap Connection (FHTC) by retrofitting within the command area of Sahapurr Piped Water Supply Scheme , SM/07201 Retrofitting Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Sahapur (Part-A) village of Sahapur piped water supply scheme within Katwa Sub-Division under Burdwan Division, PHE Dte. [Phase-I](Tr No.-503/BWD/20-21) Assistant Engineer ORD/000176/2020-2021 238/KTS 30/09/2020 4 RAINBOW CONSTRUCTION 1.45 1.45 100 1
3644 PURBA BARDHAMAN Burdwan Division Providing Functional House Hold Tap Connection (FHTC) by retrofitting within the command area of Sahapurr Piped Water Supply Scheme , SM/07201 Retrofitting Water tap connection in each house hold from existing distribution system within scheme jurisdiction in SAHAPUR (Part-B) village of Sahapur piped water supply scheme within Katwa Sub-Division under Burdwan Division, PHE Dte. [Phase-I](Tr No.-494/BWD/2020-21) Assistant Engineer ORD/000174/2020-2021 239/KTS 30/09/2020 4 DUBE ENTERPRISE 1.42 1.41 99.3 1
3645 PURBA BARDHAMAN Burdwan Division Providing Functional House Hold Tap Connection (FHTC) by retrofitting within the command area of Sahapurr Piped Water Supply Scheme , SM/07201 Retrofitting Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Sahapur (Pt-A) village of Sahapur Piped Water Supply Scheme within Katwa Sub-Divn. under Burdwan Division, PHE. Dte. [Phase - I] [SL.No : 11A] (Agreement no.505/BWD of 2020-21) Assistant Engineer ORD/000144/2020-2021 2607/BWD 04/08/2020 30 DUBE ENTERPRISE 4.92 4.92 100 1
3646 PURBA BARDHAMAN Burdwan Division Providing Functional House Hold Tap Connection (FHTC) by retrofitting within the command area of Sahapurr Piped Water Supply Scheme , SM/07201 Retrofitting Continuation work order for Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Sahapur (Pt-B) village of Sahapur Piped Water Supply Scheme within Katwa Sub-Divn. under Burdwan Division, PHE. Dte. [Phase - I] [SL.No : ¿11B¿](Agreement no.-497/BWD of 2020-21) Assistant Engineer ORD/000146/2020-2021 4913/BWD 08/12/2020 30 DUBE ENTERPRISE 2.84 0.00 0 1
3647 PURBA BARDHAMAN Burdwan Division Providing Functional House Hold Tap Connection (FHTC) by retrofitting within the command area of Sahapurr Piped Water Supply Scheme , SM/07201 Retrofitting Publication charges bill for the office of the Executive Engineer, Burdwan Division, PHE Dte.[Invoice No.-BCWB20RV-0001293, dt.-19/05/20, BCWB20RV-0001770, dt.-31/05/20, BCWB20RV-0001920, dt.-05/06/20, BCWB20RV-0001860, dt.-03/06/20, BCWB20RV-0001861, dt.-03/06/20, BCWB20RV-0001928, dt.-05/06/20, BCWB20RV-0001820, dt.-03/06/20, BCWB19RV-0059455, dt.-20/03/20, BCWB19RV-0059454. dt.-20/03/20, BCWB19RV-0057682, dt.-12/03/20, BCWB20RV-0003210, dt.-26/06/20, BCWB20RV-0000918, dt.-07/05/20, BCWB20RV-0001352, dt.-22/05/20, BCWB19RV-0050592, dt.-30/01/20] VCH/000411/2022-2023 240/DW/22-23 04/07/2022 BENNETT COLEMAN & COMPANY LIMITED 1.89 0.00 0 0
3648 PURBA BARDHAMAN Burdwan Division Providing Functional House Hold Tap Connection (FHTC) by retrofitting within the command area of Sahapurr Piped Water Supply Scheme , SM/07201 Retrofitting Hire & fuel charges of vehicle (Car No.-WB-04G-7127) for the month of May & June'23. BILL/00791/2023-2024 632/JJM 13/09/2023 PARTHA PRATIM ACHARYA 0.77 0.00 0 0
3649 PURBA BARDHAMAN Burdwan Division Providing Functional House Hold Tap Connection (FHTC) by retrofitting within the command area of Sahapurr Piped Water Supply Scheme , SM/07201 Retrofitting Detail route survey, design of distribution network and preparation of estimate, drawing & DPR for providing FHTC in the scheme AGRADWIP, KHETPUR PALASHI, SAHAPUR PWSS (Sl No-1) Assistant Engineer JUNIOR ENGINEER KATWA SUB-DIVISION PHE DTE ORD/000069/2023-2024 393/KTS 13/04/2023 30 SIRCON ENGINEERING SERVICES 3.71 0.00 0 100
3650 PURBA BARDHAMAN Burdwan Division Providing Functional House Hold Tap Connection (FHTC) by retrofitting within the command area of Sahapurr Piped Water Supply Scheme , SM/07201 Retrofitting Augmentation of SAHAPUR Piped Water Supply Scheme with sinking of Tube-well, LDS, Rising Main, FHTC & renovation of switch-rooms & boundary walls at different TW site under Katwa-II Block, District:- Purba-Bardhaman. Assistant Engineer JUNIOR ENGINEER KATWA SUB-DIVISION PHE DTE ORD/000132/2023-2024 2343/BWD 22/05/2023 120 KHEPIMA ENGINEERS CO. OPERATIVE SOCIETY LTD. 137.76 0.00 0 95
3651 PURBA BARDHAMAN Burdwan Division Providing Functional House Hold Tap Connection (FHTC) by retrofitting within the command area of Sahapurr Piped Water Supply Scheme , SM/07201 Retrofitting Continuation work order for Supply of 1 (one) No. Diesel driven Ambassador Car (Luxury Taxi) / Motor Cab on hire basis for the Office of the Assistant Engineer, under Katwa Sub-Division within Burdwan Division, P.H.E. Dte. [Period from 01.07.2024 to 31.12.2024]. Assistant Engineer JUNIOR ENGINEER KATWA SUB-DIVISION PHE DTE ORD/000562/2024-2025 788/KTS 28/06/2024 180 KRISHNA MONDAL 2.40 2.32 96.67 80
3652 PURBA BARDHAMAN Burdwan Division Providing Functional House Hold Tap Connection (FHTC) by retrofitting within the command area of Kshetpur Palashi Piped Water Supply Scheme , SM/07202 Retrofitting Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Khetpur (Pt-B) village of Khetpur Palasi piped water supply scheme within Katwa Sub-Division under Burdwan Division, PHE Dte. [Phase-I](Tr No.-165/BWD/2020-21) Assistant Engineer ORD/000105/2020-2021 2605/BWD 04/08/2020 30 SANTANU BHATTACHARYAY 4.92 4.92 100 1
3653 PURBA BARDHAMAN Burdwan Division Providing Functional House Hold Tap Connection (FHTC) by retrofitting within the command area of Kshetpur Palashi Piped Water Supply Scheme , SM/07202 Retrofitting Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Khetpur (Pt.-A) village of Khetpur Palasi piped water supply scheme within Katwa Sub-Division under Burdwan Division, PHE Dte. [Phase-I](Tr No.-183/BWD/2020-21) Assistant Engineer ORD/000104/2020-2021 2601/BWD 04/08/2020 30 CHANCHAL PAL 4.92 4.92 100 1
3654 PURBA BARDHAMAN Burdwan Division Providing Functional House Hold Tap Connection (FHTC) by retrofitting within the command area of Kshetpur Palashi Piped Water Supply Scheme , SM/07202 Retrofitting Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Khetpur Palashi (Pt-B) village of Khetpur Palashi piped water supply scheme within Katwa Sub-Division under Burdwan Division, PHE Dte. [Phase-I](Tr No.-463/BWD/2020-21) Assistant Engineer ORD/000284/2020-2021 242/KTS 01/10/2020 4 SANTANU BHATTACHARYAY 1.21 1.20 99.17 1
3655 PURBA BARDHAMAN Burdwan Division Providing Functional House Hold Tap Connection (FHTC) by retrofitting within the command area of Kshetpur Palashi Piped Water Supply Scheme , SM/07202 Retrofitting Continuation work order for Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Khetpur (Pt-A) village of Khetpur-Palashi piped water supply scheme within Katwa Sub-Division under Burdwan Division, PHE Dte. [Phase-I](Tr No.-257/BWD/2020-21) Assistant Engineer ORD/000473/2020-2021 3528-A/BWD 25/09/2020 30 CHANCHAL PAL 2.81 2.81 100 1
3656 PURBA BARDHAMAN Burdwan Division Providing Functional House Hold Tap Connection (FHTC) by retrofitting within the command area of Kshetpur Palashi Piped Water Supply Scheme , SM/07202 Retrofitting Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Khetpur village of Khetpur Palashi piped water supply scheme within Katwa Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer ORD/000626/2020-2021 366/KTS 15/12/2020 7 TAPAS KUMAR ROY 2.82 2.80 99.29 1
3657 PURBA BARDHAMAN Burdwan Division Providing Functional House Hold Tap Connection (FHTC) by retrofitting within the command area of Kshetpur Palashi Piped Water Supply Scheme , SM/07202 Retrofitting Construction of sluice valve chamber (80 mm dia S/V) of Khetpur Palashi piped water supply scheme under Katwa Sub-Division under Burdwan Division, PHE Dte.[Sl No.-01] Assistant Engineer ORD/000731/2020-2021 14/KTS 08/01/2021 3 CHANCHAL PAL 0.41 0.41 100 1
3658 PURBA BARDHAMAN Burdwan Division Providing Functional House Hold Tap Connection (FHTC) by retrofitting within the command area of Kshetpur Palashi Piped Water Supply Scheme , SM/07202 Retrofitting Providing Functional Household Tap Connection from existing distribution system within the command area of Kshetpur Palashi PWSS under Katwa Sub-Division under Burdwan Division PHE Dte. [Sl No-1] Assistant Engineer ORD/000589/2021-2022 126/KTS 21/02/2022 30 SANTANU BHATTACHARYAY 3.19 3.16 99.06 1
3659 PURBA BARDHAMAN Burdwan Division Providing Functional House Hold Tap Connection (FHTC) by retrofitting within the command area of Kshetpur Palashi Piped Water Supply Scheme , SM/07202 Retrofitting Hire & fuel charges of vehicle (Car No.-WB-41H/3668) for the office of the Assistant Engineer, RWS Burdwan Sub-Division, PHE Dte. for the month of July & August'2022. VCH/000645/2022-2023 612/VEH/22-23 23/09/2022 MD HASIN 0.56 0.00 0 0
3660 PURBA BARDHAMAN Burdwan Division Providing Functional House Hold Tap Connection (FHTC) by retrofitting within the command area of Kshetpur Palashi Piped Water Supply Scheme , SM/07202 Retrofitting Continuation work order for supply of 10 mm NB Gun-Metal /Brass Ferrul conforming to IS:2692-1989 for water tap connection in each household from existing distribution system within scheme jurisdiction in different piped water supply scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. and delivered at Barsul Divisional Store.[Part-6] Assistant Engineer ORD/000867/2020-2021 4318/BWD 04/11/2020 10 MD HASIN 4.93 0.00 0 1
3661 PURBA BARDHAMAN Burdwan Division Providing Functional House Hold Tap Connection (FHTC) by retrofitting within the command area of Kshetpur Palashi Piped Water Supply Scheme , SM/07202 Retrofitting Hire & fuel charges of vehicle (Car No.-WB-04G-6018) for the office of the Assistant Engineer, Katwa Sub-Division, PHE Dte. for the month of January'23. BILL/00468/2022-2023 1118/JJM 27/02/2023 M/S MUNMUN DEY 0.26 0.00 0 0
3662 PURBA BARDHAMAN Burdwan Division Providing Functional House Hold Tap Connection (FHTC) by retrofitting within the command area of Kshetpur Palashi Piped Water Supply Scheme , SM/07202 Retrofitting Detail route survey, design of distribution network and preparation of estimate, drawing & DPR for providing FHTC in the scheme AGRADWIP, KHETPUR PALASHI, SAHAPUR PWSS (Sl No-1) Assistant Engineer JUNIOR ENGINEER KATWA SUB-DIVISION PHE DTE ORD/000069/2023-2024 393/KTS 13/04/2023 30 SIRCON ENGINEERING SERVICES 3.71 0.00 0 100
3663 PURBA BARDHAMAN Burdwan Division Providing Functional House Hold Tap Connection (FHTC) by retrofitting within the command area of Kshetpur Palashi Piped Water Supply Scheme , SM/07202 Retrofitting Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Khetpur Palashi (Part-A) village of Khetpur Palashi piped water supply scheme within Katwa Sub-Division under Burdwan Division, PHE Dte. (Tr No.-471/BWD/2020-21) Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000350/2020-2021 241/KTS 01/10/2020 4 CHANCHAL PAL 1.19 1.17 98.32 1
3664 PURBA BARDHAMAN Burdwan Division Providing Functional House Hold Tap Connection (FHTC) by retrofitting within the command area of Kshetpur Palashi Piped Water Supply Scheme , SM/07202 Retrofitting Providing of balance FHTC and other allied works at different location under the command area of Kshetpur Palasi PWSS (SM/07202) in order to declare Sajal Gram, Block - Katwa-II Block under Katwa Sub-Division, PHE Dte. (Sl No-3) ORD/001327/2024-2025 459/KTS 17/03/2025 21 DULU MIDDA 4.81 0.00 0 0
3665 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Chhotobainan Piped Water Supply Scheme , SM/06968 Retrofitting Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Momrejpur village of Chhotobainan piped water supply scheme within Burdwan Sub-Division under Burdwan Division, PHE Dte. [Phase-I](Tr No.-174/BWD/2020-21) ORD/000119/2020-2021 2741/BWD 10/08/2020 30 TIRUPATI ENTERPRISES 4.92 4.92 100 1
3666 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Chhotobainan Piped Water Supply Scheme , SM/06968 Retrofitting Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of Chhotobainan Piped Water Supply Scheme at Chhotobainan (3 Nos Part Habitation), Akhina, Dakhin Mohanour, Pahalanpur & Rupsara Village (Mouza), Raina-II Block under Burdwan Division, PHE Dte.(Agreement No. 62/2020-2021 OF SE/CC/PHE. DTE.) Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000127/2020-2021 4852/BWD 04/12/2020 90 TIRUPATI ENTERPRISES 100.40 82.44 82.11 1
3667 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Chhotobainan Piped Water Supply Scheme , SM/06968 Retrofitting Extension of pipeline for CHHOTOBAINAN water supply scheme at Pahalanpur and Rupsara and Dakshin Mohonpur village within Raina-II Block under Burdwan Division, PHE Dte. [Gr.-E] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000212/2021-2022 988/BSD 30/07/2021 30 TIRUPATI ENTERPRISES 4.82 3.35 69.5 1
3668 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Chhotobainan Piped Water Supply Scheme , SM/06968 Retrofitting Supply of materials for different water supply scheme under Burdwan Division, PHE Dte. VCH/001246/2021-2022 900/DW 03/02/2022 EXECUTIVE ENGINEER, RESOURCES DIVISION, P.H.E. DTE. 34.54 0.00 0 0
3669 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Chhotobainan Piped Water Supply Scheme , SM/06968 Retrofitting Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Chhotobainan village of Chhotobainan piped water supply scheme within Burdwan Sub-Division under Burdwan Division, PHE Dte. [Phase-I](Tr No.-173/BWD/2020-21) ORD/000118/2020-2021 2740/BWD 10/08/2020 30 BOSE ENTERPRISE 4.90 4.90 100 1
3670 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Chhotobainan Piped Water Supply Scheme , SM/06968 Retrofitting Extension of pipeline for CHHOTOBAINAN water supply scheme at Chhotobainan village within Raina-II Block under Burdwan Division, PHE Dte. (Gr.-D) Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000208/2021-2022 956/BSD 23/07/2021 30 BOSE ENTERPRISE 4.92 4.03 81.91 0
3671 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting at Mugura PWSS , SM/06747 Retrofitting Continuation work order for Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Mugura village of Mugura Piped Water Supply Scheme within Headquarters under Burdwan Division, PHE. Dte. [Phase - I] [GROUP : ¿3A¿] (Agreement no. 163/BWD,2020-2021) Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000135/2020-2021 3535/BWD 25/09/2020 30 LAKSHMIKANTA DAS 2.69 0.00 0 1
3672 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting at Mugura PWSS , SM/06747 Retrofitting Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Jagarpur & Mugura village of Mugura Piped Water Supply Scheme within Headquarters under Burdwan Division, PHE. Dte. [Phase - I] [GROUP : ¿3B¿] (Agreement no.238/BWD of 2020-21) Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000136/2020-2021 4118/BWD 16/10/2020 30 HAFIJUR RAHAMAN MIDYA 4.92 0.00 0 1
3673 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting at Mugura PWSS , SM/06747 Retrofitting Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Mugura village of Mugura piped water supply scheme within Headquarters under Burdwan Division, PHE Dte. [Phase-I](Tr No.-163/BWD/2020-21) Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000088/2020-2021 2690/BWD 07/08/2020 30 LAKSHMIKANTA DAS 4.92 4.92 100 1
3674 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting at Mugura PWSS , SM/06747 Retrofitting Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Jagarpur & Mugura village of Mugura piped water supply scheme within Headquarters under Burdwan Division, PHE Dte. [Phase-I](Tr No.-238/BWD/2020-21) Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000095/2020-2021 2689/BWD 07/08/2020 30 HAFIJUR RAHAMAN MIDYA 4.92 4.92 100 1
3675 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting at Mugura PWSS , SM/06747 Retrofitting Providing 7 Nos.FHTC at Mugura Dakshinpara village under MUGURA Piped Water Supply Scheme,Block:Raina-I within Burdwan Sub Division under Burdwan Division PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/001013/2024-2025 08/BSD 02/01/2025 15 RUPALI ENTERPRISE 0.76 0.74 97.37 100
3676 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting at Mugura PWSS , SM/06747 Retrofitting Laying Parallel Pipeline to improve drinking water supply, Construction of Boundary wall, Path Way, Drain at Head Work Site & 2nd TW Site and providing leftout FHTC, Road Restoration with allied work for MUGRA Piped Water Supply Scheme, Block- Raina-I, within Burdwan Sub Division under Burdwan Division PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000279/2024-2025 2711/BWD 11/07/2024 2720 M/S PURBASHA 40.24 0.00 0 70
3677 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Keunta Piped Water Supply Scheme , SM/07820 Retrofitting Supply of materials for different water supply scheme under Burdwan Division, PHE Dte. VCH/001013/2021-2022 null 21/01/2022 EXECUTIVE ENGINEER, RESOURCES DIVISION, P.H.E. DTE. 617.98 0.00 0 0
3678 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Keunta Piped Water Supply Scheme , SM/07820 Retrofitting Payment for supply of materials for different water supply scheme under Burdwan Division, PHE Dte. VCH/001045/2021-2022 934/DW 31/01/2022 EXECUTIVE ENGINEER, RESOURCES DIVISION, P.H.E. DTE. 617.98 0.00 0 0
3679 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Keunta Piped Water Supply Scheme , SM/07820 Retrofitting Providing Functional Household Tap Connection (FHTC) at Nandanpur and Rampur village within the command area of Keunta Piped Water Supply Scheme at Raina-II Block under Burdwan Division, PHE Dte. [Group : D] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000461/2021-2022 69/AE/HQ 11/02/2022 30 SUPER SKILL 4.16 3.85 92.55 1
3680 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Keunta Piped Water Supply Scheme , SM/07820 Retrofitting Providing leftout water tap connection in different villages for 100% coverage to make it Sajal Gram from existing distribution system within scheme jurisdiction of different Piped Water Supply Schemes within Raina ¿ II Block under Burdwan Division, PHE. Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000390/2021-2022 269/BWD 14/01/2022 30 PRONAB KUMAR DEY 6.99 3.32 47.5 1
3681 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Keunta Piped Water Supply Scheme , SM/07820 Retrofitting Repairing of damage concrete work due to laying of pipeline at Keunta within Keunta water supply scheme under Burdwan Division, PHE Dte. [Gr.-G] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000556/2021-2022 1895/AE/HQ 16/11/2021 30 DUBE ENTERPRISE 2.39 2.27 94.98 1
3682 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Keunta Piped Water Supply Scheme , SM/07820 Retrofitting Realignment and culvert crossing of D.I. pipeline at damaged section and repairing of uPVC pipeline at Nandanpur, Keunta and Rampur village within Keunta Piped Water Supply Scheme, Raina ¿ II Block under Burdwan Division, PHE. Dte. [Group : D] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000043/2022-2023 236/AE/HQ 19/04/2022 30 SUPER SKILL 4.61 3.15 68.33 1
3683 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Keunta Piped Water Supply Scheme , SM/07820 Retrofitting Extension of pipe line for providing Functional Household Tap Connection (FHTC) and construction of sluice valve chamber within the command area of KEUNTA Piped Water Supply scheme, Raina-II Block under Burdwan Division, PHE Dte._Gr-H Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000663/2021-2022 138/AE/HQ 15/03/2022 20 SUPER SKILL 4.81 3.63 75.47 1
3684 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Keunta Piped Water Supply Scheme , SM/07820 Retrofitting Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of KEUNTA Piped Water Supply Scheme at Kalui, Keunta, Kulpukur, Rathtala, Mandarpur, Rampur & Nandanpur habitation, Raina - I Block under Burdwan Division, PHE Dte. (Agreement No. 57/2020-2021 OF SE/CC/PHE. DTE.) Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000443/2020-2021 4853/BWD 04/12/2020 90 SUPER SKILL 95.71 49.10 51.3 1
3685 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Keunta Piped Water Supply Scheme , SM/07820 Retrofitting Pipeline with FHTC for KEUNTA Water Supply Scheme at Kalui village (30 Nos.), Keunta village (30 Nos.), Mandarpur village (30 Nos.), Rampur village (30 Nos.), Nandanpur village (60 Nos.), within Raina-II Block, under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000712/2022-2023 855/BWD 28/02/2023 45 DUBE ENTERPRISE 60.10 31.00 51.58 100
3686 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Keunta Piped Water Supply Scheme , SM/07820 Retrofitting Vehicle bill for the office of the Assistant Engineer, Burdwan Division, PHE Dte. for the month of July'23. BILL/00613/2023-2024 560/JJM 24/08/2023 SK.ASFIA 0.40 0.00 0 0
3687 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Keunta Piped Water Supply Scheme , SM/07820 Retrofitting Material Requisition To Resource Division RTOR000005/2021-2022 3692/BWD 16/07/2021 Resource Division 12.43 0.00 0 0
3688 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Keunta Piped Water Supply Scheme , SM/07820 Retrofitting Hire & fuel charges of vehicle Car No.-WB-41J-6795 for the month of June & July2023. BILL/01035/2023-2024 745/JJM 11/10/2023 MD HASIN 0.79 0.00 0 0
3689 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Serua Piped Water Supply Scheme at Bhatar Block , SM/07828 Retrofitting Continuation work order for Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Basuda village and Basuda Habitation of Serua piped water supply scheme within Durgapur (Bardhaman North) Sub-Division under Burdwan Division, PHE Dte. [Phase-I][Gr.-9A] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000791/2020-2021 4086/BWD 16/10/2020 30 DHIRENDRANATH SOM 4.87 0.00 0 1
3690 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Serua Piped Water Supply Scheme at Bhatar Block , SM/07828 Retrofitting Extension of pipeline at "Bamunara & Kumarun & Sakraw" villages of Serua and its adjoining mouza's Piped W/S Scheme at Bhatar Block within Durgapur Sub Division under Burdwan Division, P.H.E. Dte. [Gr.-F] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000335/2021-2022 05/DSD 03/01/2022 30 DHIRENDRANATH SOM 2.98 0.00 0 0
3691 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Serua Piped Water Supply Scheme at Bhatar Block , SM/07828 Retrofitting Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of Serua Piped Water Supply Scheme at Rajipur, Ratanpur, Serua & Basuda (P) village, Bhatar Block under Burdwan Division, PHE Dte.[Agreement No. 708/BWD OF 2020-2021] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000340/2020-2021 1580/BWD 22/02/2021 60 SUPER CO. OPERATIVE LABOUR CONTRACT AND CONSTRUCTION SOCIETY LTD. 74.30 53.86 72.49 1
3692 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Serua Piped Water Supply Scheme at Bhatar Block , SM/07828 Retrofitting Extension of 180 mm dia pipeline at "Serua" villages of Serua and its adjoining mouza's Piped W/S Scheme at Bhatar Block within Durgapur Sub Division under Burdwan Division, P.H.E. Dte. [Gr.-A] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000331/2021-2022 01/DSD 03/01/2022 30 DHIRENDRANATH SOM 4.82 4.80 99.59 1
3693 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Serua Piped Water Supply Scheme at Bhatar Block , SM/07828 Retrofitting Extension of 50 mm dia. pipeline at "Serua-Basuda-Jhujkadanga" villages of Serua and its adjoining mouza's Piped W/S Scheme at Bhatar Block within Durgapur Sub Division under Burdwan Division, P.H.E. Dte.[Gr.-C] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000332/2021-2022 02/DSD 03/01/2022 30 DHIRENDRANATH SOM 1.84 0.86 46.74 1
3694 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Serua Piped Water Supply Scheme at Bhatar Block , SM/07828 Retrofitting Extension of pipeline at "Panua, Ratanpur & Rajipur" villages of Serua and its adjoining mouza's Piped W/S Scheme at Bhatar Block within Durgapur Sub Division under Burdwan Division, P.H.E. Dte. [Gr.-E] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000334/2021-2022 04/DSD 03/01/2022 30 DHIRENDRANATH SOM 4.68 2.09 44.66 1
3695 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Serua Piped Water Supply Scheme at Bhatar Block , SM/07828 Retrofitting Providing leftout water tap connection in different villages for 100% coverage to make it Sajal Gram from existing distribution system within scheme jurisdiction of different Piped Water Supply Schemes within Bhatar Block under Burdwan Division, PHE. Dte. Assistant Engineer ,Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000389/2021-2022 268/BWD 14/01/2022 30 BHARAT CONSTRUCTION 14.17 0.00 0 1
3696 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Serua Piped Water Supply Scheme at Bhatar Block , SM/07828 Retrofitting Relaying of distribution main in alternate route for improvement of water supply at Basudha (South Panoa) village within Serua water supply scheme in Bhatar Block under Burdwan Division, PHE Dte. Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000698/2021-2022 6119/BWD 25/10/2021 30 KOUSIK MALLICK 26.54 25.91 97.63 1
3697 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Serua Piped Water Supply Scheme at Bhatar Block , SM/07828 Retrofitting Trial boring at Kumarun for Serua and its Adjoining Mouza Water Supply Scheme within Bhatar Block under Burdwan Division PHE Dte. [Gr.-C] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000314/2022-2023 526/DSD 22/08/2022 7 BABA ADHIRA CONSTRUCTION 0.60 0.60 100 1
3698 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Serua Piped Water Supply Scheme at Bhatar Block , SM/07828 Retrofitting Trial boring at Serua for Serua and its Adjoining Mouza Water Supply Scheme within Bhatar Block under Burdwan Division PHE Dte. [Gr.-D] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000315/2022-2023 527/DSD 22/08/2022 7 BABA ADHIRA CONSTRUCTION 0.60 0.60 100 1
3699 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Serua Piped Water Supply Scheme at Bhatar Block , SM/07828 Retrofitting Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of Serua Piped Water Supply Scheme at Bamunara village (Bamunara habs), Jhujkadanga village, Kumarun village & Panua (P) village (Panua (P) & Sakra habs), Bhatar Block under Burdwan Division, PHE Dte.[ Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000344/2020-2021 1579/BWD 22/02/2021 60 SUPER CO. OPERATIVE LABOUR CONTRACT AND CONSTRUCTION SOCIETY LTD. 54.03 44.55 82.45 1
3700 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Serua Piped Water Supply Scheme at Bhatar Block , SM/07828 Retrofitting Construction of Boundary wall, Land Development work at Head work site, Construction of approach road from main road to OHR of SERUA Piped water supply Scheme, P.H.E Dte. Block:-Bhatar Dist: Purba Bardhaman. Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/001341/2024-2025 1024/BWD 21/03/2025 90 KALYAN CHOWDHURY 18.74 0.00 0 0
3701 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Serua Piped Water Supply Scheme at Bhatar Block , SM/07828 Retrofitting Sinking of 250 X 150 mm dia Tubewell, Construction of pump House, Connection with pump house and Modification to distribution network by making a loop and extension with uPVC pipe to augment the Water Supply to FHTC at Kumarun and Serua village of SERUA and its adjoining mouzas W/S Scheme under Burdwan Division, P.H.E. Dte. Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000281/2024-2025 989/BWD 17/03/2025 120 KOUSIK MALLICK 49.87 0.00 0 0
3702 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Serua Piped Water Supply Scheme at Bhatar Block , SM/07828 Retrofitting Restoration and shifting of pipeline, providing sluice valve, Painting and minor repairing of Switch room, Clearing compound premises, making temporary earthen road and repairing of old Valve chamber, Septic tank etc of Serua Piped water supply Scheme , P.H.E Dte. Block:-Bhatar Dist: Purba Bardhaman. ORD/001417/2024-2025 236/DSD 07/02/2025 45 DHIRENDRANATH SOM 10.43 0.00 0 0
3703 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) under the command area of Kenna Piped Water Supply Scheme , SM/07544 Retrofitting Continuation work order for Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Kailaspur Habitation of Kenna Piped Water Supply Scheme within Burdwan Sub-Divn. under Burdwan Division, PHE. Dte. [GROUP : ¿L¿] (T.R. No. 248/BWD of 2020-2021) Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000162/2020-2021 3517/BWD 25/09/2020 30 BRINDABAN KONAR 4.92 0.00 0 1
3704 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) under the command area of Kenna Piped Water Supply Scheme , SM/07544 Retrofitting Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Kailaspur Habitation of Kenna Piped Water Supply Scheme within Burdwan Sub-Divn. under Burdwan Division, PHE. Dte. [GROUP : ¿L¿] (T.R. No. 201/BWD of 2020-2021) ORD/000161/2020-2021 2399/BWD 20/07/2020 30 BRINDABAN KONAR 4.92 0.00 0 1
3705 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) under the command area of Kenna Piped Water Supply Scheme , SM/07544 Retrofitting Continuation work order for Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Kenna village of Kenna piped water supply scheme within Burdwan Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000604/2020-2021 1225/BWD 11/02/2021 30 BRINDABAN KONAR 4.92 4.92 100 1
3706 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) under the command area of Kenna Piped Water Supply Scheme , SM/07544 Retrofitting Extension of pipeline for Kenna Water Supply Scheme (Kenna, Dahura, Kailashpur, Dadur, Baral Village) within Memari - I Block including leftout household water tap connection (FHTC) under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000207/2021-2022 6307/BWD 09/11/2021 60 T.K. BANERJEE & CO. 41.46 9.96 24.02 1
3707 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) under the command area of Kenna Piped Water Supply Scheme , SM/07544 Retrofitting Providing leftout water tap connection in different villages for 100% coverage to make it Sajal Gram from existing distribution system within scheme jurisdiction of different Piped Water Supply Schemes within Memari-I Block (Daluibazar-II, Gopegantar-I & II G.P.) under Burdwan Division, PHE. Dte. Dte._Part-A. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000371/2021-2022 209/BWD 11/01/2022 30 M/S ANAND CONSTRUCTION 21.11 5.00 23.69 1
3708 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) under the command area of Kenna Piped Water Supply Scheme , SM/07544 Retrofitting Hire & fuel charges of vehicle (Car No.-WB-41G-2149) for the office of the Assistant Engineer, Burdwan Sub-Division, PHE Dte. for the month of February'23. BILL/00565/2022-2023 1226/JJM 20/03/2023 SK.ASFIA 0.40 0.00 0 0
3709 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) under the command area of Kenna Piped Water Supply Scheme , SM/07544 Retrofitting Extension of pipeline for KENNA Piped Water Supply Scheme at Kaliashpur 25 Nos FHTC Work for Sajal Gram (As per Field Verification Report for Har Ghar Jal Certification within Memari-I Block including leftout household water tap connection (FHTC) under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. Junior Engineer, RWS, Memari-I Dev. Bolck ORD/000848/2022-2023 1391-A/BSD 08/08/2022 5 BRINDABAN KONAR 0.97 0.00 0 0
3710 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) under the command area of Kenna Piped Water Supply Scheme , SM/07544 Retrofitting Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of KENNA Piped Water Supply Scheme at Dandur, Kailashpur (2 Nos. Habitation) village (Mouza), Memari - I Block under Burdwan Division, PHE Dte.[Agreement No. 570/BWD OF 2020-2021.] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000329/2020-2021 438/BWD 19/01/2021 30 BRINDABAN KONAR 22.09 21.79 98.64 0
3711 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting at Madanagar PWSS , SM/06770 Retrofitting Continuation work order for Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Madanagar habitation of Madanagar piped water supply scheme within Burdwan Sub-Division under Burdwan Division, PHE Dte.(Tr No.-531/BWD/2020-21) Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000199/2020-2021 3741/BWD 07/10/2020 30 PABITRA KUMAR SAMANTA 4.92 4.92 100 1
3712 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting at Madanagar PWSS , SM/06770 Retrofitting Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Madanagar (Part) village (Madanagar Mejhpur Habitation) of Madanagar piped water supply scheme within Burdwan Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000605/2020-2021 69/BWD 05/01/2021 15 PABITRA KUMAR SAMANTA 4.86 4.05 83.33 1
3713 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting at Madanagar PWSS , SM/06770 Retrofitting Continuation work order for Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Madanagar village of Madanagar piped water supply scheme within Burdwan Sub-Division under Burdwan Division, PHE Dte. [Phase-I](Tr No.-716/BWD/2020-21) Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000651/2020-2021 1224/BWD 11/02/2021 30 PABITRA KUMAR SAMANTA 3.76 3.76 100 1
3714 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting at Madanagar PWSS , SM/06770 Retrofitting Providing leftout water tap connection in different villages for 100% coverage to make it Sajal Gram from existing distribution system within scheme jurisdiction of different Piped Water Supply Schemes within Raina ¿ I Block under Burdwan Division, PHE. Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000344/2021-2022 39/BWD 05/01/2022 30 HAFIJUR RAHAMAN MIDYA 15.62 0.00 0 1
3715 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting at Madanagar PWSS , SM/06770 Retrofitting Extension Pipeline with Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of MADANAGAR Piped Water Supply Scheme within Raina I Block of Burdwan Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000063/2023-2024 1935/BWD 24/04/2023 30 S.C. ENTERPRISE 20.87 9.45 45.28 100
3716 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting at Madanagar PWSS , SM/06770 Retrofitting Preparation and Submission of DPR for Augmentation of Ground Water Based Piped Water Supply Scheme for MADHANAGAR, Block:Raina-I under Burdwan Division, P.H.E Dte. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000990/2024-2025 1912/BSD 28/08/2024 15 MEASURE LAND 0.78 0.00 0 0
3717 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting at Madanagar PWSS , SM/06770 Retrofitting Restore of damaged Pipeline at Madanagar Dakshin Para under MADANAGAR Piped Water Supply Scheme, Block- Raina-I within Burdwan Sub Division under Burdwan Division PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/001051/2023-2024 823/BWD 28/02/2024 30 UTPAL NANDI 6.18 0.00 0 100
3718 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting at Sonarudra PWSS , SM/06771 Retrofitting Interconnection of tube well no.-1 & Tube well No.-2 along with connection of existing OHR by 100 mm dia DI (K9) pipe and construction of sluice valve chamber of Sonarudra water supply scheme within Kalna Sub-Division, under Burdwan Division, PHE Dte. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000549/2020-2021 8/KSD 05/01/2021 30 BISWAS ENTERPRISE 2.54 2.28 89.76 1
3719 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting at Sonarudra PWSS , SM/06771 Retrofitting Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of SONARUDRA Piped Water Supply Scheme at Purbasthali-I Block under Burdwan Division, PHE Dte.(Agreement No. 51/2020-2021 OF SE/CC/PHE. DTE.) AE(HQs) J.E. 2 BURDWAN ORD/000120/2020-2021 4900/BWD 07/12/2020 90 J.D.J. ENTERPRISE 88.29 22.10 25.03 0
3720 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting at Sonarudra PWSS , SM/06771 Retrofitting Providing FHTC from the existing distribution line and special repair of existing different dia UPVC pipeline including supply of Sluice Valve for proper functioning the existing line of Sonarudra W/S Scheme of Purbasthali-I block within Kalna Sub-Division under Burdwan Division, PHE Dte. (Sl No-A) Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000394/2021-2022 1260/KSD Dt-22.12.2021 22/12/2021 30 BABUL SK 4.14 2.42 58.45 1
3721 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting at Sonarudra PWSS , SM/06771 Retrofitting Providing FHTC from the existing distribution line and special repair of existing different dia UPVC pipeline including supply of Sluice Valve for proper functioning the existing line of Sonarudra W/S Scheme of Purbasthali-I block within Kalna Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000672/2021-2022 29/KSD 07/01/2022 30 BABUL SK 4.14 0.92 22.22 1
3722 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting at Sonarudra PWSS , SM/06771 Retrofitting Supply of 10 mm NB Gun-metal Ferrule conforming to IS: 2692-1989 for Water tap connection in each house hold from existing distribution system within Scheme jurisdiction in different Piped Water Supply Scheme within Kalna Sub-Division under Burdwan Division, PHE. Dte. and delivered at Borsul Divl. Store. [Part-5]. AE(HQs) J.E. 2 BURDWAN ORD/000090/2021-2022 3590/BWD 13/07/2021 30 PREMANANDA ROY BISWAS 127.50 10.38 8.14 1
3723 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting at Sonarudra PWSS , SM/06771 Retrofitting Construction of pathway & plinth protection of Pump House and Surface Drain at the Head Work Site of Sonarudra water supply scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. (Sl No-A) ORD/000356/2021-2022 1218/KSD Dt-10.12.2021 10/12/2021 30 BABUL SK 1.77 1.72 97.18 1
3724 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting at Sonarudra PWSS , SM/06771 Retrofitting Continuation work order for supply of 10 mm NB Gun-Metal /Brass Ferrul conforming to IS:2692-1989 for water tap connection in each household from existing distribution system within scheme jurisdiction in different piped water supply scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. and delivered at Barsul Divisional Store.[Part-6] Assistant Engineer ORD/000867/2020-2021 4318/BWD 04/11/2020 10 MD HASIN 4.93 0.00 0 1
3725 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting at Sonarudra PWSS , SM/06771 Retrofitting Formal Work Order for Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of Kashira Piped Water Supply Scheme at Chanak (Part), Gopalbera, Krishnapur, Gatistha & Kashira (Part) Village (Mouza), Mongolkot Block under Burdwan Division, PHE Dte. (Agreement No. 99/SE/CC/PHE/Dte of 2020-2021) AE(HQs) J.E. 2 BURDWAN ORD/000418/2020-2021 915/BWD 02/02/2021 60 MAJUMDER ENTERPRISE 53.52 7.18 13.42 0
3726 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting at Sonarudra PWSS , SM/06771 Retrofitting Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Paranpur village and Paranpur habitation of Jahannagar piped water supply scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. [Phase-I](Tr No.-814/BWD/2020-21) Assistant Engineer ORD/000548/2020-2021 4110/BWD 16/10/2020 30 J. K. CORPORATION 4.86 2.74 56.38 0
3727 PURBA BARDHAMAN Burdwan Division Augmentation of CHAMPAHATI PWSS for providing functional household tap connection FHTC in Purbasthali-I block under Burdwan Division in Purba Bardhaman District , SM/09416 Augmentation Preparation of DPR for augmentation of Champahati W/S Scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. (Sl No-G) Assistant Engineer ORD/000573/2021-2022 209/KSD 23/02/2022 21 INDRANIL DUTTA & ASSOCIATES 2.70 2.71 100.37 1
3728 PURBA BARDHAMAN Burdwan Division Augmentation of CHAMPAHATI PWSS for providing functional household tap connection FHTC in Purbasthali-I block under Burdwan Division in Purba Bardhaman District , SM/09416 Augmentation Supply of materials for different water supply scheme under Burdwan Division, PHE Dte. VCH/001578/2021-2022 1207/DW 10/03/2022 EXECUTIVE ENGINEER, RESOURCES DIVISION, P.H.E. DTE. 3,005.00 0.00 0 0
3729 PURBA BARDHAMAN Burdwan Division Augmentation of CHAMPAHATI PWSS for providing functional household tap connection FHTC in Purbasthali-I block under Burdwan Division in Purba Bardhaman District , SM/09416 Augmentation Relaying of HDPE pipeline at damaged portion at Kutirpara village within Champahati W/S Scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. (Sl No-A) Assistant Engineer ORD/000469/2021-2022 152/KSD 15/02/2022 30 P.C. CONSTRUCTION 4.84 4.85 100.21 1
3730 PURBA BARDHAMAN Burdwan Division Augmentation of CHAMPAHATI PWSS for providing functional household tap connection FHTC in Purbasthali-I block under Burdwan Division in Purba Bardhaman District , SM/09416 Augmentation Material Requisition To Resource Division RTOR000048/2021-2022 564/BWD 27/01/2022 Resource Division 10.64 0.00 0 0
3731 PURBA BARDHAMAN Burdwan Division Augmentation of CHAMPAHATI PWSS for providing functional household tap connection FHTC in Purbasthali-I block under Burdwan Division in Purba Bardhaman District , SM/09416 Augmentation Material Requisition To Resource Division RTOR000211/2021-2022 1534/BWD 15/03/2022 Resource Division 0.37 0.00 0 0
3732 PURBA BARDHAMAN Burdwan Division Augmentation of CHAMPAHATI PWSS for providing functional household tap connection FHTC in Purbasthali-I block under Burdwan Division in Purba Bardhaman District , SM/09416 Augmentation Material Requisition To Resource Division RTOR000103/2021-2022 950/BWD 17/02/2022 Resource Division 35.32 0.00 0 0
3733 PURBA BARDHAMAN Burdwan Division Augmentation of CHAMPAHATI PWSS for providing functional household tap connection FHTC in Purbasthali-I block under Burdwan Division in Purba Bardhaman District , SM/09416 Augmentation Material Requisition To Resource Division RTOR000084/2021-2022 606/BWD 28/01/2022 Resource Division 24.12 0.00 0 0
3734 PURBA BARDHAMAN Burdwan Division Augmentation of CHAMPAHATI PWSS for providing functional household tap connection FHTC in Purbasthali-I block under Burdwan Division in Purba Bardhaman District , SM/09416 Augmentation Material Requisition To Resource Division RTOR000040/2022-2023 4633/BWD 17/10/2022 Resource Division 12.32 0.00 0 0
3735 PURBA BARDHAMAN Burdwan Division Augmentation of CHAMPAHATI PWSS for providing functional household tap connection FHTC in Purbasthali-I block under Burdwan Division in Purba Bardhaman District , SM/09416 Augmentation Additional works to implement the CHAMPAHATI Piped Water Supply Scheme under Purbasthali-I Block, Dist :- Purba Burdwan under Burdwan Divn., PHE. Dte. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000757/2022-2023 1270/BWD 17/03/2023 30 MONDAL ENTERPRISE 24.02 7.25 30.18 50
3736 PURBA BARDHAMAN Burdwan Division Augmentation of CHAMPAHATI PWSS for providing functional household tap connection FHTC in Purbasthali-I block under Burdwan Division in Purba Bardhaman District , SM/09416 Augmentation Work Order for "Laying of Rising Main for CHAMPAHATI(SM/09416) Piped Water Supply Scheme within Kalna Sub-Division under Burdwan Division, PHE Dte." Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/001184/2023-2024 2187/KSD 15/03/2024 10 DEL DELTA CONSTRUCTION 4.82 0.00 0 2
3737 PURBA BARDHAMAN Burdwan Division Augmentation of CHAMPAHATI PWSS for providing functional household tap connection FHTC in Purbasthali-I block under Burdwan Division in Purba Bardhaman District , SM/09416 Augmentation Augmentation of CHAMPAHATI Piped Water Supply Scheme with LDS, FHTC, Rising Main, Construction of 250 Cum capacity OHR with 20.0 Mtr. Staging height inclusive of soil test with construction of boundary wall at Head works site under Kalna ¿ II Block, District - Purba Bardhaman. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000653/2021-2022 1655/BWD 22/03/2022 365 MONDAL ENTERPRISE 265.13 239.60 90.37 80
3738 PURBA BARDHAMAN Burdwan Division Augmentation of CHAMPAHATI PWSS for providing functional household tap connection FHTC in Purbasthali-I block under Burdwan Division in Purba Bardhaman District , SM/09416 Augmentation Additional works for construction of OHR having capacity 250 cum in connection with Augmentation of CHAMPAHATI PWSS (SM/09416) under Purbasthali-I Block under Kalna Sub-Division, PHE Dte. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000359/2024-2025 2924/BWD 26/07/2024 90 MONDAL ENTERPRISE 27.44 0.00 0 2
3739 PURBA BARDHAMAN Burdwan Division Augmentation of CHAMPAHATI PWSS for providing functional household tap connection FHTC in Purbasthali-I block under Burdwan Division in Purba Bardhaman District , SM/09416 Augmentation Additional Work of CHAMPAHATI Piped Water Supply Scheme with sinking of Tube-wells, LDSs, FHTCs, construction of switch rooms & boundary wall with gate under PURBASTHALI-I Block, District:- Purba Bardhaman._2ND CALL. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/001011/2023-2024 370/BWD 29/01/2024 245 ANWESHA CONSTRUCTION 59.07 0.00 0 20
3740 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap connection (FHTC) by retrofitting within the command area of PALSIT Piped Water Supply Scheme at BURDWAN-II Block under Burdwan Division, P.H.E. DTE. , SM/08714 Retrofitting Additional extension UPVC distribution Pipeline in connection with FHTC work for Palsit Piped Water Supply Scheme at Khargram, Karanda, Palsit & Bhaita under Bardhaman- II Block under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000172/2021-2022 6065/BWD 07/10/2021 30 BRINDABAN KONAR 14.22 13.89 97.68 1
3741 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap connection (FHTC) by retrofitting within the command area of PALSIT Piped Water Supply Scheme at BURDWAN-II Block under Burdwan Division, P.H.E. DTE. , SM/08714 Retrofitting Hire & fuel charges of vehicle (Car No.-WB-41H/3668) for the office of the Assistant Engineer, RWS Burdwan Sub-Division, PHE Dte. for the month of July & August'2022. VCH/000645/2022-2023 612/VEH/22-23 23/09/2022 MD HASIN 0.56 0.00 0 0
3742 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap connection (FHTC) by retrofitting within the command area of PALSIT Piped Water Supply Scheme at BURDWAN-II Block under Burdwan Division, P.H.E. DTE. , SM/08714 Retrofitting Construction of boundary wall including land development at 2nd Pump house of PALSIT within command area of PALSIT Piped W/S. Scheme under Burdwan Division, PHE. Dte. [Group : F] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000057/2022-2023 238/AE/HQ 19/04/2022 30 M/S F.S. ENTERPRISE 0.96 0.00 0 1
3743 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap connection (FHTC) by retrofitting within the command area of PALSIT Piped Water Supply Scheme at BURDWAN-II Block under Burdwan Division, P.H.E. DTE. , SM/08714 Retrofitting Providing FHTC for 100% coverage in different village from existing distribution system within PALSIT PWSS, Bardhhaman-II Development Block under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000790/2022-2023 1423/BWD 24/03/2023 30 BABUL SK 28.53 27.27 95.58 100
3744 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap connection (FHTC) by retrofitting within the command area of PALSIT Piped Water Supply Scheme at BURDWAN-II Block under Burdwan Division, P.H.E. DTE. , SM/08714 Retrofitting Sinking of 300 X 200mm dia Tube Well 150 mtr. Depth by D.R. Rig method using UPVC pipe (CM) and UPVC Deep Well Screen (RMS) for Augmentation of PALSIT & its adjoining mouzas Piped Water Supply Scheme, Block - Burdwan - II, Dist - Purba Bardhaman under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000523/2022-2023 4886/BWD 02/11/2022 30 WESTERN WATER SUPPLY AGENCY 10.04 10.04 100 100
3745 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap connection (FHTC) by retrofitting within the command area of PALSIT Piped Water Supply Scheme at BURDWAN-II Block under Burdwan Division, P.H.E. DTE. , SM/08714 Retrofitting Construction of Pump House cum chlorine room without sanitary and water supply arrangement at Tube Well Site to departmental drawing no-PHE/BD/P.H/DRG/02/DEC-17(Size 3.60 mtr x 3.00 mtr room) for PALSIT its Adjoining Mouza W/S Scheme, Block -Bardhaman-II within Burdwan Sub-Division, PHE Dte. (Mouza- KARANA) Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000766/2022-2023 498/BSD 21/03/2023 45 M/S PALASH BISWAS 3.32 1.59 47.89 100
3746 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap connection (FHTC) by retrofitting within the command area of PALSIT Piped Water Supply Scheme at BURDWAN-II Block under Burdwan Division, P.H.E. DTE. , SM/08714 Retrofitting Providing functional household tap connection (FHTC) from existing distribution system within the command area of Palsit piped water supply scheme at Bhaita (11 Nos Habitation), Khargram (17 Nos. Habitation), Palsit (19 Nos. Habitation), Karanda (17 Nos. Habitation) & Paschim Chandipur village, Bardhaman-II Block under Burdwan Division, PHE Dte. AE(HQs) J.E. 2 BURDWAN ORD/000528/2020-2021 5000/BWD 10/12/2020 90 BRINDABAN KONAR 96.95 27.91 28.79 0
3747 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap connection (FHTC) by retrofitting within the command area of PALSIT Piped Water Supply Scheme at BURDWAN-II Block under Burdwan Division, P.H.E. DTE. , SM/08714 Retrofitting Providing parallel distribution system from Khargram more to Bhaita High School within PALSIT PWSS, Bardhhaman-II Development Block under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. Junior Engineer, Burdwan Sadar Sub-Division ORD/000968/2023-2024 005/BWD 02/01/2024 30 TARAMA AGENCY 20.68 0.00 0 100
3748 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap connection (FHTC) by retrofitting within the command area of PALSIT Piped Water Supply Scheme at BURDWAN-II Block under Burdwan Division, P.H.E. DTE. , SM/08714 Retrofitting Construction of boundary wall at HEAD WORK Site of PALSIT Piped W/S. Scheme under Burdwan-II Block of Burdwan Division, PHE Dte. (Length =186.00 Mtr, Col-75 Nos). Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. Junior Engineer, Burdwan Sadar Sub-Division ORD/000474/2024-2025 3134/BWD 16/08/2024 212 SK BADIUZZAMAL 14.51 0.00 0 100
3749 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap connection (FHTC) by retrofitting within the command area of PALSIT Piped Water Supply Scheme at BURDWAN-II Block under Burdwan Division, P.H.E. DTE. , SM/08714 Retrofitting Providing left out FHTC for 100% covarage in different village within PALSIT PWSS , Bardhhaman-II Development Block under Burdwan Division, PHE Dte. Junior Engineer, Burdwan Sadar Sub-Division ORD/000116/2024-2025 995/BSD 06/06/2024 30 M/S PALASH BISWAS 0.96 0.00 0 100
3750 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap connection (FHTC) by retrofitting within the command area of PALSIT Piped Water Supply Scheme at BURDWAN-II Block under Burdwan Division, P.H.E. DTE. , SM/08714 Retrofitting Providing left out FHTC for 100% coverage in different village within PALSIT PWSS, Bardhhaman-II Development Block under Burdwan Division, PHE Dte Junior Engineer, Burdwan Sadar Sub-Division ORD/000153/2024-2025 1038/BSD 10/06/2024 30 M/S PALASH BISWAS 0.95 0.47 49.47 100
3751 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap connection (FHTC) by retrofitting within the command area of PALSIT Piped Water Supply Scheme at BURDWAN-II Block under Burdwan Division, P.H.E. DTE. , SM/08714 Retrofitting Laying of inter connection R.main to OHR,OHR to LDS & By pass connection for PALSIT PWSS under Burdwan Sub-Division under Burdwan Division,PHE Dte. Junior Engineer, Burdwan Sadar Sub-Division ORD/001280/2024-2025 503/BSD 06/03/2025 15 HAMID SK 0.94 0.00 0 0
3752 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap connection (FHTC) by retrofitting within the command area of PALSIT Piped Water Supply Scheme at BURDWAN-II Block under Burdwan Division, P.H.E. DTE. , SM/08714 Retrofitting Different Types of work involved in connection with different Augmentation & New Schemes (11 Nos.) Piped Water Supply Scheme under Burdwan II Block within Burdwan Sub-Div., under Burdwan Division PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/001349/2024-2025 1060/BWD 25/03/2025 120 R.G. INFRASTRUCTURE 262.23 0.00 0 0
3753 PURBA BARDHAMAN Burdwan Division Augmentation of ground water based MAJHIGRAM SINGOT PWSS to accommodate FHTC in Mangolkote block under Katwa Sub Division of Burdwan Division in Purba Bardhaman District , SM/09569 Augmentation Route Survey and preparation of DPR for MAJHIGRAM-SINGHOT PWSS under Mongalkote Block under Katwa Sub-Division under Burdwan Division PHE Dte. [Sl No-05] Assistant Engineer ORD/000546/2021-2022 56/KTS 25/01/2022 21 RADIANT 2.63 2.63 100 1
3754 PURBA BARDHAMAN Burdwan Division Augmentation of ground water based MAJHIGRAM SINGOT PWSS to accommodate FHTC in Mangolkote block under Katwa Sub Division of Burdwan Division in Purba Bardhaman District , SM/09569 Augmentation Supply of materials for different water supply scheme under Burdwan Division, PHE Dte. VCH/001578/2021-2022 1207/DW 10/03/2022 EXECUTIVE ENGINEER, RESOURCES DIVISION, P.H.E. DTE. 3,005.00 0.00 0 0
3755 PURBA BARDHAMAN Central Mechanical Augmentation of ground water based MAJHIGRAM SINGOT PWSS to accommodate FHTC in Mangolkote block under Katwa Sub Division of Burdwan Division in Purba Bardhaman District , SM/09569 Augmentation Supply , delivery & Installation of Submersible Pumping Machinery , Voltage stabiliser , Chlorinator and Internal House wiring for Tube well No. 3 of Majhigram Water Supply Scheme under CMD, PHE Dte., Dist.- Purba-Bardhaman. [ Block- Mongalkoat ] ASSISTANT ENGINEER ORD/000013/2022-2023 1173/CMD 27/06/2022 30 MITRA ENTERPRISE 9.22 9.03 97.94 1
3756 PURBA BARDHAMAN Burdwan Division Augmentation of ground water based MAJHIGRAM SINGOT PWSS to accommodate FHTC in Mangolkote block under Katwa Sub Division of Burdwan Division in Purba Bardhaman District , SM/09569 Augmentation Construction of Pump House cum chlorine room without sanitary and water supply arrangement at Head Work Site to departmental drawing (Size 3.60 mtr x 3.00 mtr room) for MAJHIGRAM SINGOT water supply schemes under Katwa Sub-Division within Burdwan Division, PHE Dte. [ G.L to P.L Height= 1.20 Mtr] (Sl No-1) Assistant Engineer ORD/000273/2021-2022 798/KTS 10/12/2021 60 BABUL SK 3.24 2.91 89.81 1
3757 PURBA BARDHAMAN Burdwan Division Augmentation of ground water based MAJHIGRAM SINGOT PWSS to accommodate FHTC in Mangolkote block under Katwa Sub Division of Burdwan Division in Purba Bardhaman District , SM/09569 Augmentation Construction of sanitary Latrine and water supply arrangement at Head Work Site of Majhigram Singot piped water supply schemes under Mongalkote Block under Katwa Sub-Division under Burdwan Division, PHE Dte.[Sl No-01] Assistant Engineer ORD/000593/2021-2022 159/KTS 24/02/2022 21 BABUL SK 1.76 1.72 97.73 1
3758 PURBA BARDHAMAN Burdwan Division Augmentation of ground water based MAJHIGRAM SINGOT PWSS to accommodate FHTC in Mangolkote block under Katwa Sub Division of Burdwan Division in Purba Bardhaman District , SM/09569 Augmentation Material Requisition To Resource Division RTOR000163/2021-2022 1323/BWD 08/03/2022 Resource Division 16.00 0.00 0 0
3759 PURBA BARDHAMAN Burdwan Division Augmentation of ground water based MAJHIGRAM SINGOT PWSS to accommodate FHTC in Mangolkote block under Katwa Sub Division of Burdwan Division in Purba Bardhaman District , SM/09569 Augmentation Material Requisition To Resource Division RTOR000059/2021-2022 545/BWD 27/01/2022 Resource Division 16.58 0.00 0 0
3760 PURBA BARDHAMAN Burdwan Division Augmentation of ground water based MAJHIGRAM SINGOT PWSS to accommodate FHTC in Mangolkote block under Katwa Sub Division of Burdwan Division in Purba Bardhaman District , SM/09569 Augmentation Material Requisition To Resource Division RTOR000219/2021-2022 1553/BWD 15/03/2022 Resource Division 0.37 0.00 0 0
3761 PURBA BARDHAMAN Burdwan Division Augmentation of ground water based MAJHIGRAM SINGOT PWSS to accommodate FHTC in Mangolkote block under Katwa Sub Division of Burdwan Division in Purba Bardhaman District , SM/09569 Augmentation Material Requisition To Resource Division RTOR000181/2021-2022 1376/BWD 09/03/2022 Resource Division 3.83 0.00 0 0
3762 PURBA BARDHAMAN Burdwan Division Augmentation of ground water based MAJHIGRAM SINGOT PWSS to accommodate FHTC in Mangolkote block under Katwa Sub Division of Burdwan Division in Purba Bardhaman District , SM/09569 Augmentation Material Requisition To Resource Division RTOR000016/2022-2023 3275/BWD 29/07/2022 Resource Division 34.57 0.00 0 0
3763 PURBA BARDHAMAN Burdwan Division Augmentation of ground water based MAJHIGRAM SINGOT PWSS to accommodate FHTC in Mangolkote block under Katwa Sub Division of Burdwan Division in Purba Bardhaman District , SM/09569 Augmentation Augmentation of MAJHIGRAM SINGOT Piped Water Supply Scheme with LDS, FHTC, Rising Main, Construction of 400 Cum capacity OHR with 20.0 Mtr. Staging height inclusive of soil investigation including repair of pump house at head works & 2ND TW site under Mangalkote Block, District - Purba Bardhaman. Assistant Engineer JE, Katwa Sub-Division,JUNIOR ENGINEER KATWA SUB-DIVISION PHE DTE,Junior Engineer2, Durgapur Sub-Division, PHE Dte. ORD/000009/2022-2023 1939/BWD 11/04/2022 360 INDIAN ENGINEERS CO.-OPERATIVE SOCIETY LTD. 369.39 184.08 49.83 85
3764 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED PARHATI PWSS TO ACCOMMODATE FHTC IN MEMARI-II BLOCK UNDER KATWA SUB DIVISION OF BURDWAN DIVISION IN PURBA BURDWAN DISTRICT , SM/08998 Augmentation Supply of materials for different water supply scheme under Burdwan Division, PHE Dte. VCH/001578/2021-2022 1207/DW 10/03/2022 EXECUTIVE ENGINEER, RESOURCES DIVISION, P.H.E. DTE. 3,005.00 0.00 0 0
3765 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED PARHATI PWSS TO ACCOMMODATE FHTC IN MEMARI-II BLOCK UNDER KATWA SUB DIVISION OF BURDWAN DIVISION IN PURBA BURDWAN DISTRICT , SM/08998 Augmentation Route Survey & Preparation of DPR for Parhati W/S Scheme under Memari-II Block under Burdwan Sub-Division under Burdwan Division PHE Dte. Sl No.13. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000502/2021-2022 188/BSD 31/01/2022 30 RADIANT 2.72 2.72 100 1
3766 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED PARHATI PWSS TO ACCOMMODATE FHTC IN MEMARI-II BLOCK UNDER KATWA SUB DIVISION OF BURDWAN DIVISION IN PURBA BURDWAN DISTRICT , SM/08998 Augmentation Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of PARHATI Piped Water Supply Scheme (Mouza- Akalia, Chandipur, Ganti, Kabastigiri, Kanpur, Kasipur, Madhupur, Parhati, Tajpur) of Burdwan Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000551/2022-2023 5193/BWD 24/11/2022 45 ANWESHA CONSTRUCTION 39.72 39.67 99.87 1
3767 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED PARHATI PWSS TO ACCOMMODATE FHTC IN MEMARI-II BLOCK UNDER KATWA SUB DIVISION OF BURDWAN DIVISION IN PURBA BURDWAN DISTRICT , SM/08998 Augmentation Supply and delivery of different dia. CIDF sluice valve for Augmentation of Paharhati, Nababhat, Shyamsundar & Dewandighi-Mirzapur Piped Water Supply Scheme within Burdwan Sub-Division under Burdwan Division, P.H.E. Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000519/2022-2023 4703/BWD 19/10/2022 20 SSPR VALVE MANUFACTURING PVT LTD. 14.45 0.00 0 1
3768 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED PARHATI PWSS TO ACCOMMODATE FHTC IN MEMARI-II BLOCK UNDER KATWA SUB DIVISION OF BURDWAN DIVISION IN PURBA BURDWAN DISTRICT , SM/08998 Augmentation Material Requisition To Resource Division RTOR000094/2021-2022 904/BWD 15/02/2022 Resource Division 11.38 0.00 0 0
3769 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED PARHATI PWSS TO ACCOMMODATE FHTC IN MEMARI-II BLOCK UNDER KATWA SUB DIVISION OF BURDWAN DIVISION IN PURBA BURDWAN DISTRICT , SM/08998 Augmentation Material Requisition To Resource Division RTOR000052/2021-2022 549/BWD 27/01/2022 Resource Division 16.90 0.00 0 0
3770 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED PARHATI PWSS TO ACCOMMODATE FHTC IN MEMARI-II BLOCK UNDER KATWA SUB DIVISION OF BURDWAN DIVISION IN PURBA BURDWAN DISTRICT , SM/08998 Augmentation Material Requisition To Resource Division RTOR000198/2021-2022 1521/BWD 15/03/2022 Resource Division 0.37 0.00 0 0
3771 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED PARHATI PWSS TO ACCOMMODATE FHTC IN MEMARI-II BLOCK UNDER KATWA SUB DIVISION OF BURDWAN DIVISION IN PURBA BURDWAN DISTRICT , SM/08998 Augmentation Augmentation of PARHATI Piped Water Supply Scheme with LDS, Construction of 350 Cum capacity OHR with 20.0 Mtgr. Staging height inclusive of soil test & FHTC under Memari - II Block, District - Purba Bardhaman. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000597/2021-2022 1472/BWD 14/03/2022 360 ASHOK KUMAR GHOSH 361.27 325.54 90.11 100
3772 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED PARHATI PWSS TO ACCOMMODATE FHTC IN MEMARI-II BLOCK UNDER KATWA SUB DIVISION OF BURDWAN DIVISION IN PURBA BURDWAN DISTRICT , SM/08998 Augmentation Providing Balance Functional Household Tap Connection (848 nos FHTC) from existing distribution system within the command area of PARHATI Piped Water Supply Scheme at (Akalia, Chandipur, Ganti, Kabastigiri, Kanpur, Kasipur, Madhupur, Parhati, Tajpur) Mouza, Construction of boundary wall at head work site & 2nd T/W site under MEMARI-II Block of Burdwan Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000776/2022-2023 1363/BWD 22/03/2023 60 ASHOK KUMAR GHOSH 53.71 26.86 50.01 100
3773 PURBA BARDHAMAN Burdwan Division Providing Water Supply Arrangement by Sinking of Tube Well at left out Primary Schools(250 nos) for 100% School Coverage in Purba Bardhaman within Katwa Sub Division under Burdwan Division P.H.E. DTE. , SM/11514 School Material Requisition To Resource Division RTOR000048/2022-2023 5400/BWD 12/12/2022 Resource Division 105.18 0.00 0 0
3774 PURBA BARDHAMAN Burdwan Division Providing Water Supply Arrangement by Sinking of Tube Well at left out Primary Schools(250 nos) for 100% School Coverage in Purba Bardhaman within Katwa Sub Division under Burdwan Division P.H.E. DTE. , SM/11514 School Sinking of 100mtr. deep 100 × 40mm tubewell for providing water supply arrangement in Schools under Katwa ? II Block (27 Nos School) within Purba Bardhaman District under Burdwan Division, PHE Dte. Assistant Engineer ORD/000277/2022-2023 3526/BWD 12/08/2022 45 KHEPIMA ENGINEERS CO. OPERATIVE SOCIETY LTD. 30.20 24.50 81.13 0
3775 PURBA BARDHAMAN Burdwan Division Providing Water Supply Arrangement by Sinking of Tube Well at left out Primary Schools(250 nos) for 100% School Coverage in Purba Bardhaman within Katwa Sub Division under Burdwan Division P.H.E. DTE. , SM/11514 School Sinking of 100mtr. deep 100 × 40mm tubewell for providing water supply arrangement in Schools under Katwa I Block (35 Nos School) within Purba Bardhaman District under Burdwan Division, PHE Dte.(Part-A). Assistant Engineer ORD/000280/2022-2023 3587/BWD 17/08/2022 45 HAMID SK 38.97 33.15 85.07 0
3776 PURBA BARDHAMAN Burdwan Division Providing Water Supply Arrangement by Sinking of Tube Well at left out Primary Schools(250 nos) for 100% School Coverage in Purba Bardhaman within Katwa Sub Division under Burdwan Division P.H.E. DTE. , SM/11514 School Sinking of 100mtr. deep 100 × 40mm tubewell for providing water supply arrangement in Schools under Katwa I Block (35 Nos School) within Purba Bardhaman District under Burdwan Division, PHE Dte.(Part B). Assistant Engineer ORD/000305/2022-2023 3635/BWD 23/08/2022 45 JAI MAA DURGA & CO. 39.46 36.01 91.26 0
3777 PURBA BARDHAMAN Burdwan Division Providing Water Supply Arrangement by Sinking of Tube Well at left out Primary Schools(250 nos) for 100% School Coverage in Purba Bardhaman within Katwa Sub Division under Burdwan Division P.H.E. DTE. , SM/11514 School Sinking of 100mtr. deep 100 × 40mm tubewell for providing water supply arrangement in Schools under Ketugram - I Block (33 Nos School) within Purba Bardhaman District under Burdwan Division, PHE Dte. (Part-B)._2ND CALL. Assistant Engineer ORD/000278/2022-2023 3586/BWD 17/08/2022 45 ANIRUDDHA FARUQUE 35.94 34.06 94.77 0
3778 PURBA BARDHAMAN Burdwan Division Providing Water Supply Arrangement by Sinking of Tube Well at left out Primary Schools(250 nos) for 100% School Coverage in Purba Bardhaman within Katwa Sub Division under Burdwan Division P.H.E. DTE. , SM/11514 School Sinking of 100mtr. deep 100 × 40mm tubewell for providing water supply arrangement in Schools under Ketugram - II Block (09 Nos School) within Purba Bardhaman District under Burdwan Division, PHE Dte. Assistant Engineer ORD/000362/2022-2023 3807/BWD 02/09/2022 30 M/S STANDARD CONSTRUCTION 9.76 7.37 75.51 0
3779 PURBA BARDHAMAN Burdwan Division Providing Water Supply Arrangement by Sinking of Tube Well at left out Primary Schools(250 nos) for 100% School Coverage in Purba Bardhaman within Katwa Sub Division under Burdwan Division P.H.E. DTE. , SM/11514 School Sinking of 100mtr. deep 100 × 40mm tubewell for providing water supply arrangement in Schools under Mongalkote Block (39 Nos School) within Purba Bardhaman District under Burdwan Division, PHE Dte.(Part-A). Assistant Engineer JUNIOR ENGINEER R.W.S. BURDWAN SUB-DIVISION PHE DTE ORD/000267/2022-2023 3515/BWD 12/08/2022 45 NANGTASWAR CO. OP. LABOUR CONT. AND CONSTRUCTION SOCIETY LTD. 43.97 39.72 90.33 100
3780 PURBA BARDHAMAN Burdwan Division Providing Water Supply Arrangement by Sinking of Tube Well at left out Primary Schools(250 nos) for 100% School Coverage in Purba Bardhaman within Katwa Sub Division under Burdwan Division P.H.E. DTE. , SM/11514 School Sinking of 100mtr. deep 100 × 40mm tubewell for providing water supply arrangement in Schools under Mongalkote Block (39 Nos School) within Purba Bardhaman District under Burdwan Division, PHE Dte.(Part-B). Assistant Engineer JUNIOR ENGINEER R.W.S. BURDWAN SUB-DIVISION PHE DTE ORD/000268/2022-2023 3516/BWD 12/08/2022 45 S.S. CONSTRUCTION 43.97 4.77 10.85 100
3781 PURBA BARDHAMAN Burdwan Division Providing Water Supply Arrangement by Sinking of Tube Well at left out Primary Schools(250 nos) for 100% School Coverage in Purba Bardhaman within Katwa Sub Division under Burdwan Division P.H.E. DTE. , SM/11514 School Sinking of 100mtr. deep 100 × 40mm tubewell for providing water supply arrangement in Schools under Ketugram - I Block (33 Nos School) within Purba Bardhaman District under Burdwan Division, PHE Dte. (Part-A). Assistant Engineer ORD/000266/2022-2023 3514/BWD 12/08/2022 45 JAHAR GHOSH 36.83 33.55 91.09 100
3782 PURBA BARDHAMAN Burdwan Division Providing Water Supply Arrangement by Sinking of Tube Well at left out Primary Schools(250 nos) for 100% School Coverage in Purba Bardhaman within Katwa Sub Division under Burdwan Division P.H.E. DTE. , SM/11514 School Material Requisition To Resource Division RTOR000024/2022-2023 3301/BWD 29/07/2022 Resource Division 32.50 0.00 0 0
3783 PURBA BARDHAMAN Mangolkote Burdwan Division KOTALGHOSH PIPED WATER SUPPLY SCHEME , SM/14062 New Material Requisition To Resource Division RTOR000387/2023-2024 2197/BWD 12/05/2023 Resource Division 1.48 0.00 0 0
3784 PURBA BARDHAMAN Mangolkote Central Mechanical KOTALGHOSH PIPED WATER SUPPLY SCHEME , SM/14062 New New service connection charges for Kotalghosh PWSS TW-1 BILL/01482/2023-2024 BP-2023-24-183 04/10/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 6.28 0.00 0 0
3785 PURBA BARDHAMAN Mangolkote Burdwan Division KOTALGHOSH PIPED WATER SUPPLY SCHEME , SM/14062 New Material Requisition To Resource Division RTOR000113/2023-2024 1965/BWD 26/04/2023 Resource Division 1.92 0.00 0 0
3786 PURBA BARDHAMAN Mangolkote Burdwan Division KOTALGHOSH PIPED WATER SUPPLY SCHEME , SM/14062 New Material Requisition To Resource Division RTOR000812/2023-2024 306/BWD 24/01/2024 Resource Division 20.47 0.00 0 0
3787 PURBA BARDHAMAN Mangolkote Central Mechanical KOTALGHOSH PIPED WATER SUPPLY SCHEME , SM/14062 New NEW SERVICE CONNECTION FOR KOTALGHOSH PWSS TW 2. BILL/02487/2023-2024 BP-2023-24-540 15/02/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 6.46 0.00 0 0
3788 PURBA BARDHAMAN Mangolkote Central Mechanical KOTALGHOSH PIPED WATER SUPPLY SCHEME , SM/14062 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Jabagram & others water supply scheme under Mangalkote Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. Driller In-Charge Junior Engineer ORD/000118/2024-2025 2590/CMD 27/08/2024 90 M/S SAJAHAN CHOWDHURY 62.06 0.00 0 0
3789 PURBA BARDHAMAN Mangolkote Central Mechanical KOTALGHOSH PIPED WATER SUPPLY SCHEME , SM/14062 New Additional quotation in second time against additional works at Kotalghosh PWSS TW-2. BILL/00699/2024-2025 BP-2024-25-269 23/08/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 1.87 0.00 0 0
3790 PURBA BARDHAMAN Mangolkote Burdwan Division KOTALGHOSH PIPED WATER SUPPLY SCHEME , SM/14062 New Material Requisition To Resource Division RTOR000068/2024-2025 394/BWD 17/01/2025 Resource Division 7.28 0.00 0 0
3791 PURBA BARDHAMAN Mangolkote Central Mechanical KOTALGHOSH PIPED WATER SUPPLY SCHEME , SM/14062 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at KOTALGHOSH Water Supply Scheme [ Block- MONGOLKOTE] under CMD, PHE Dte., Dist.- Purba-Bardhaman. Driller In-Charge Junior Engineer ORD/000925/2023-2024 4188/CMD 29/08/2023 610 MITRA ASSOCIATE 26.74 5.13 19.18 48
3792 PURBA BARDHAMAN Mangolkote Central Mechanical KOTALGHOSH PIPED WATER SUPPLY SCHEME , SM/14062 New Supply and delivery of 10 HP pump motor set at T.W. No - 2 of Kotalghosh water supply scheme under CMD, PHE Dte Driller In-Charge JUNIOR ENGINEER ORD/000786/2024-2025 926/DIC/BMSD(D) 26/12/2024 7 MITRA ASSOCIATE 0.75 0.00 0 100
3793 PURBA BARDHAMAN Mangolkote Burdwan Division KOTALGHOSH PIPED WATER SUPPLY SCHEME , SM/14062 New KOTALGHOSH Piped Water Supply Scheme with sinking of Tube-well, LDS, Rising Main, FHTC, Construction of 200 cum capacity RCC OHR with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drain and internal pathway at different TW site under Mongalkote Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer JUNIOR ENGINEER KATWA SUB-DIVISION PHE DTE ORD/000498/2023-2024 3528/BWD 10/08/2023 600 BRINDABAN KONAR 325.17 54.33 16.71 5
3794 PURBA BARDHAMAN Ausgram - I,Mangolkote Burdwan Division KALYANPUR PIPED WATER SUPPLY SCHEME , SM/13939 New Material Requisition To Resource Division RTOR000026/2023-2024 1962/BWD 25/04/2023 Resource Division 25.59 0.00 0 0
3795 PURBA BARDHAMAN Ausgram - I,Mangolkote Burdwan Division KALYANPUR PIPED WATER SUPPLY SCHEME , SM/13939 New Material Requisition To Resource Division RTOR000302/2023-2024 2197/BWD 12/05/2023 Resource Division 8.13 0.00 0 0
3796 PURBA BARDHAMAN Ausgram - I,Mangolkote Burdwan Division KALYANPUR PIPED WATER SUPPLY SCHEME , SM/13939 New Material Requisition To Resource Division RTOR000550/2023-2024 4313/BWD 29/09/2023 Resource Division 24.08 0.00 0 0
3797 PURBA BARDHAMAN Ausgram - I,Mangolkote Central Mechanical KALYANPUR PIPED WATER SUPPLY SCHEME , SM/13939 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at Kalyanpur Water Supply Scheme [ Block-Ausgram-1 ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. Driller In-Charge JUNIOR ENGINEER ORD/000745/2023-2024 4055/CMD 29/08/2023 30 T.N. BANERJEE 27.71 0.00 0 0
3798 PURBA BARDHAMAN Ausgram - I,Mangolkote Burdwan Division KALYANPUR PIPED WATER SUPPLY SCHEME , SM/13939 New Material Requisition To Resource Division RTOR000588/2023-2024 4945/BWD 10/11/2023 Resource Division 34.27 0.00 0 0
3799 PURBA BARDHAMAN Ausgram - I,Mangolkote Burdwan Division KALYANPUR PIPED WATER SUPPLY SCHEME , SM/13939 New Material Requisition To Resource Division RTOR000775/2023-2024 201/BWD 10/01/2024 Resource Division 5.46 0.00 0 0
3800 PURBA BARDHAMAN Ausgram - I,Mangolkote Central Mechanical KALYANPUR PIPED WATER SUPPLY SCHEME , SM/13939 New NEW SERVICE CONNECTION FOR KALYANPUR PWSS. BILL/02589/2023-2024 BP-2023-24-555 20/02/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 5.16 0.00 0 0
3801 PURBA BARDHAMAN Ausgram - I,Mangolkote Central Mechanical KALYANPUR PIPED WATER SUPPLY SCHEME , SM/13939 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System, Internal House Wiring and Compound lighting arrangement for Tube well No.- 1 & 2 at KALYANPUR Water Supply Scheme [BLOCK- AUSGRAM-1] under CMD, PHE Dte., Dist.- Purba-Bardhaman. Driller In-Charge JUNIOR ENGINEER ORD/001606/2023-2024 1535/CMD 05/03/2024 60 DUTTA ENTERPRISE 28.81 0.00 0 0
3802 PURBA BARDHAMAN Ausgram - I,Mangolkote Central Mechanical KALYANPUR PIPED WATER SUPPLY SCHEME , SM/13939 New QUOTATION FOR NEW SERVICE CONNECTION FOR KALYANPUR PWSS PH-2. BILL/00194/2024-2025 BP-2024-25-90 17/05/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.89 0.00 0 0
3803 PURBA BARDHAMAN Ausgram - I,Mangolkote Central Mechanical KALYANPUR PIPED WATER SUPPLY SCHEME , SM/13939 New Quotation for New service connection for Kalyanpur PWSS PH 1 BILL/00249/2024-2025 BP-2024-25-130 05/06/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 7.51 0.00 0 0
3804 PURBA BARDHAMAN Ausgram - I,Mangolkote Durgapur W/S Division KALYANPUR PIPED WATER SUPPLY SCHEME , SM/13939 New Material Requisition To Resource Division RTOR000022/2024-2025 2/D/DWSD 02/01/2025 Resource Division 25.63 0.00 0 0
3805 PURBA BARDHAMAN Ausgram - I,Mangolkote Burdwan Division KALYANPUR PIPED WATER SUPPLY SCHEME , SM/13939 New Different works related (sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of different capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site) to ALIGRAM, JAYKRISHNAPUR, JADABGANJ & KALYANPUR Piped Water Supply Scheme under AUSGRAM-I Block, District:- Purba-Bardhaman [NEW SCHEME] AE(HQs) JUNIOR ENGINEER R.W.S. BURDWAN SUB-DIVISION PHE DTE ORD/000727/2023-2024 4581/BWD 16/10/2023 965 SAFECO ENTERPRISES 1,551.98 0.00 0 60
3806 PURBA BARDHAMAN Ausgram - I,Mangolkote Burdwan Division KALYANPUR PIPED WATER SUPPLY SCHEME , SM/13939 New Work order for Operation & Maintenance of Distribution System , Rising main, Sluice Valves, S.S. posts etc. including operation of sluice valves of Kalyanpur W/S. Scheme within Kalna Sub- Division under Burdwan Division, PHE Dte. [Period for 01.07.2023 to 30.06.2024]. Assistant Engineer JUNIOR ENGINEER RWS KALNA2 ORD/001283/2023-2024 849/KSD 28/06/2023 366 YOUNG ENGINEERS CO.-OPERATIVE SOCIETY LTD. 4.51 0.00 0 100
3807 PURBA BARDHAMAN Khandaghosh Burdwan Division RUPSA PIPED WATER SUPPLY SCHEME , SM/13298 New Material Requisition To Resource Division RTOR000079/2023-2024 1962/BWD 25/04/2023 Resource Division 8.10 0.00 0 0
3808 PURBA BARDHAMAN Khandaghosh Burdwan Division RUPSA PIPED WATER SUPPLY SCHEME , SM/13298 New Material Requisition To Resource Division RTOR000199/2023-2024 2155/BWD 10/05/2023 Resource Division 20.06 0.00 0 0
3809 PURBA BARDHAMAN Khandaghosh Burdwan Division RUPSA PIPED WATER SUPPLY SCHEME , SM/13298 New Material Requisition To Resource Division RTOR000731/2023-2024 5238/BWD 30/11/2023 Resource Division 21.07 0.00 0 0
3810 PURBA BARDHAMAN Khandaghosh Central Mechanical RUPSA PIPED WATER SUPPLY SCHEME , SM/13298 New New service connection for Rupsa W/S scheme TW No-1 BILL/02275/2023-2024 BP-2023-24-410 19/01/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 5.27 0.00 0 0
3811 PURBA BARDHAMAN Khandaghosh Burdwan Division RUPSA PIPED WATER SUPPLY SCHEME , SM/13298 New Continuation order for Supply of 01(one) No. Diesel Driven Motor Cab (Bharat Stage-II) on hire basis for the office of the Assistant Engineer, Durgapur Sub-Division (Burdwan North) P.H.E. Dte. Govt. of West Bengal (for the period of 01/01/2024 to 31/05/2024) Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer1, Durgapur Sub-Division, PHE Dte. ORD/001180/2023-2024 995/DSD 29/12/2023 183 SUJAUDDIN SEKH 2.00 0.00 0 60
3812 PURBA BARDHAMAN Khandaghosh Central Mechanical RUPSA PIPED WATER SUPPLY SCHEME , SM/13298 New Quotation for new service connection at RUPSA PWSS PH-2 BILL/00384/2024-2025 BP-2024-25-201 18/07/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 5.00 0.00 0 0
3813 PURBA BARDHAMAN Khandaghosh Central Mechanical RUPSA PIPED WATER SUPPLY SCHEME , SM/13298 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at BICHKHARA & others water supply scheme under Khandoghosh Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman ASSISTANT ENGINEER Junior Engineer ORD/000064/2024-2025 2390/CMD 02/08/2024 90 MS DAS ELECTRIC CO 46.54 0.00 0 0
3814 PURBA BARDHAMAN Khandaghosh Central Mechanical RUPSA PIPED WATER SUPPLY SCHEME , SM/13298 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at Rupsa Water Supply Scheme [ Block- Khandogosh ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER Junior Engineer ORD/000706/2023-2024 4013/CMD 29/08/2023 30 SAIKAT ENTERPRISE 28.98 0.00 0 50
3815 PURBA BARDHAMAN Khandaghosh Burdwan Division RUPSA PIPED WATER SUPPLY SCHEME , SM/13298 New Balance work for providing Functional Household Tap Connection (FHTC) within the command area BALABATI, AMRA & RUPSA W/S. Scheme of Khandaghosh Block under Burdwan Division, PHE. Dte. Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer1, Durgapur Sub-Division, PHE Dte. ORD/001189/2024-2025 609/BWD 11/02/2025 120 M/S S.S. ENTERPRISE 194.58 0.00 0 0
3816 PURBA BARDHAMAN Khandaghosh Burdwan Division RUPSA PIPED WATER SUPPLY SCHEME , SM/13298 New Different works related (sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of different capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site) to AMRA, BALABATI, UKHRID & RUPSA Piped Water Supply Scheme under KHANDAGHOSH Block, District:- Purba Bardhaman [NEW SCHEME] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer1, Durgapur Sub-Division, PHE Dte.,Junior Engineer2, Durgapur Sub-Division, PHE Dte. ORD/000008/2023-2024 1726/BWD 13/04/2023 902 S.P. CONSTRUCTION 1,710.27 0.00 0 45
3817 PURBA BARDHAMAN Khandaghosh Burdwan Division RUPSA PIPED WATER SUPPLY SCHEME , SM/13298 New FIXING OF DISPLAY BOARD WITH M.S STRUCTURE CONTAINING LAND DESCRIPTION AT RUPSA PWSS AND OTHER SCHEMES (49 Nos.) WITHIN KHANDOGHOSH BLOCK UNDER BURDWAN DIVISION , PHE Dte. Junior Engineer1, Durgapur Sub-Division, PHE Dte. ORD/000947/2024-2025 1086/DSD 11/12/2024 15 SOUMYAVASH DAS 3.18 0.00 0 100
3818 PURBA BARDHAMAN Memari - I Burdwan Division DEHA PIPED WATER SUPPLY SCHEME , SM/13506 New Material Requisition To Resource Division RTOR000238/2023-2024 2197/BWD 12/05/2023 Resource Division 8.90 0.00 0 0
3819 PURBA BARDHAMAN Memari - I Burdwan Division DEHA PIPED WATER SUPPLY SCHEME , SM/13506 New Material Requisition To Resource Division RTOR000463/2023-2024 3987/BWD 08/09/2023 Resource Division 4.94 0.00 0 0
3820 PURBA BARDHAMAN Memari - I Burdwan Division DEHA PIPED WATER SUPPLY SCHEME , SM/13506 New Material Requisition To Resource Division RTOR000664/2023-2024 5103/BWD 23/11/2023 Resource Division 20.46 0.00 0 0
3821 PURBA BARDHAMAN Memari - I Central Mechanical DEHA PIPED WATER SUPPLY SCHEME , SM/13506 New Quotation for new electric service connection at Deha PH NO.-1 BILL/01738/2023-2024 BP-2023-24-242 07/12/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 5.27 0.00 0 0
3822 PURBA BARDHAMAN Memari - I Central Mechanical DEHA PIPED WATER SUPPLY SCHEME , SM/13506 New Quotation for new electric service connection at Deha PH NO.-2 BILL/01737/2023-2024 BP-2023-24-241 07/12/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 1.48 0.00 0 0
3823 PURBA BARDHAMAN Memari - I Burdwan Division DEHA PIPED WATER SUPPLY SCHEME , SM/13506 New Continuation order for "Supply of one No. Diesel Driven Ambassador Car on hire basis for the office of the Assistant Engineer, Burdwan Sub-Division, PHE Dte for the period of 01.12.2023 to 31.05.2024 Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/001007/2023-2024 2751/BSD 28/11/2023 183 SK.ASFIA 2.40 0.00 0 70
3824 PURBA BARDHAMAN Memari - I Burdwan Division DEHA PIPED WATER SUPPLY SCHEME , SM/13506 New Continuation work order for "Supply of one No. Diesel Driven Ambassador Car on hire basis for the office of the Assistant Engineer, Burdwan Sub-Division, PHE Dte. (Period from 01-09-2024 to 30-11-2024 Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000682/2024-2025 1957/BSD 30/08/2024 91 SK. ASFIA 1.20 0.40 33.33 60
3825 PURBA BARDHAMAN Memari - I Central Mechanical DEHA PIPED WATER SUPPLY SCHEME , SM/13506 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at DEHA Water Supply Scheme [ Block- MEMARI-1 ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER Junior Engineer ORD/000807/2023-2024 4092/CMD 29/08/2023 491 ORIENTAL ENGINEERING CO. 29.39 0.00 0 100
3826 PURBA BARDHAMAN Memari - I Burdwan Division DEHA PIPED WATER SUPPLY SCHEME , SM/13506 New Restoration of concrete road by Cement concrete (mix 1:1.5:3),Providing balance FHTC, parallel pipeline, drainage system, boundary wall, Bridge, land development, Sluice valve chamber for smooth water supply of FHTC work for DURGADANGA SVS & DEHA PWSS and its adjoining mouzas within MEMARI-I BLOCK under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/001039/2024-2025 141/BWD 08/01/2025 90 MUKHERJEE ENTERPRISE 64.37 0.00 0 0
3827 PURBA BARDHAMAN Memari - I Burdwan Division DEHA PIPED WATER SUPPLY SCHEME , SM/13506 New Material Requisition To Resource Division RTOR000065/2024-2025 391/BWD 17/01/2025 Resource Division 0.44 0.00 0 0
3828 PURBA BARDHAMAN Memari - I Burdwan Division DEHA PIPED WATER SUPPLY SCHEME , SM/13506 New Continuation Work Order for Supply of one No.Diesel Driven Ambassador Car No. WB:41H-4009 on hire basis for the office of the Assistant Engineer,Burdwan Sub-Division,PHE Dte(Period from 01-03-2025 to 31.05.2025) ORD/001407/2024-2025 457/BSD 28/02/2025 90 SK. ASFIA 1.20 0.00 0 0
3829 PURBA BARDHAMAN Memari - I Burdwan Division DEHA PIPED WATER SUPPLY SCHEME , SM/13506 New Different works related (sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of different capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site) to DEHA & BIJRA Piped Water Supply Scheme under Memari I Block, District:- Purba Bardhaman [NEW SCHEME] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000092/2023-2024 2215/BWD 15/05/2023 870 CONCORD ENGINEERING 868.87 0.00 0 60
3830 PURBA BARDHAMAN Purbasthali - I Burdwan Division BAGPUR PIPED WATER SUPPLY SCHEME , SM/13323 New Material Requisition To Resource Division RTOR000216/2023-2024 2155/BWD 10/05/2023 Resource Division 11.24 0.00 0 0
3831 PURBA BARDHAMAN Purbasthali - I Burdwan Division BAGPUR PIPED WATER SUPPLY SCHEME , SM/13323 New Material Requisition To Resource Division RTOR000474/2023-2024 3998/BWD 08/09/2023 Resource Division 0.83 0.00 0 0
3832 PURBA BARDHAMAN Purbasthali - I Central Mechanical BAGPUR PIPED WATER SUPPLY SCHEME , SM/13323 New Supply & Installation of Submersible Pumping Machinery , Voltage Stabilizer, Chlorination system and internal House wiring for Tube well no.- 1 & 2 at BAGPUR Water Supply Scheme [Block-PURBASTHALI-1] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ORD/001273/2023-2024 16/CMD 03/01/2024 30 BARMAN ROY TRADERS 21.77 0.00 0 0
3833 PURBA BARDHAMAN Purbasthali - I Burdwan Division BAGPUR PIPED WATER SUPPLY SCHEME , SM/13323 New Material Requisition To Resource Division RTOR000796/2023-2024 313/BWD 24/01/2024 Resource Division 17.19 0.00 0 0
3834 PURBA BARDHAMAN Purbasthali - I Central Mechanical BAGPUR PIPED WATER SUPPLY SCHEME , SM/13323 New New service connection for BAGPUR PWSS TW-2. BILL/02398/2023-2024 BP-2023-24-499 06/02/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 4.09 0.00 0 0
3835 PURBA BARDHAMAN Purbasthali - I Central Mechanical BAGPUR PIPED WATER SUPPLY SCHEME , SM/13323 New Quotation for new service connection at Bogpur PWSS PH-1 BILL/00389/2024-2025 BP-2024-25-202 18/07/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 5.20 0.00 0 0
3836 PURBA BARDHAMAN Purbasthali - I Central Mechanical BAGPUR PIPED WATER SUPPLY SCHEME , SM/13323 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Haripur & others water supply scheme under purbasthali 1 Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000072/2024-2025 2397/CMD 02/08/2024 90 CHATTERJEE ENTERPRISE 48.60 0.00 0 0
3837 PURBA BARDHAMAN Purbasthali - I Burdwan Division BAGPUR PIPED WATER SUPPLY SCHEME , SM/13323 New Different types of works in connection with implementation of MIRGAHAR Piped Water Supply Scheme (SM/18365) & BAGPUR PWSS (SM/13323) under Kalna Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000186/2024-2025 2400/BWD 26/06/2024 120 M/S S. CHOUDHURY 301.24 0.00 0 60
3838 PURBA BARDHAMAN Purbasthali - I Burdwan Division BAGPUR PIPED WATER SUPPLY SCHEME , SM/13323 New Different works related (sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of different capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site) to MANGANPUR & BAGPUR Piped Water Supply Scheme under Purbasthali-I Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000391/2023-2024 3200/BWD 24/07/2023 730 M/S GHOSH & CO. 711.81 8.37 1.18 10
3839 PURBA BARDHAMAN Manteswar Burdwan Division GROUND WATER SUPPLY BASED PIPED WATER SUPPLY SCHEME FOR BELENDA PWSS IN MANTESHWAR BLOCK OF PURBA BARDHAMAN DISTRICT UNDER BURDWAN DIVISION PHE DTE , SM/13340 New Material Requisition To Resource Division RTOR000241/2023-2024 2197/BWD 12/05/2023 Resource Division 3.10 0.00 0 0
3840 PURBA BARDHAMAN Manteswar Burdwan Division GROUND WATER SUPPLY BASED PIPED WATER SUPPLY SCHEME FOR BELENDA PWSS IN MANTESHWAR BLOCK OF PURBA BARDHAMAN DISTRICT UNDER BURDWAN DIVISION PHE DTE , SM/13340 New Material Requisition To Resource Division RTOR000541/2023-2024 4309/BWD 29/09/2023 Resource Division 11.47 0.00 0 0
3841 PURBA BARDHAMAN Manteswar Burdwan Division GROUND WATER SUPPLY BASED PIPED WATER SUPPLY SCHEME FOR BELENDA PWSS IN MANTESHWAR BLOCK OF PURBA BARDHAMAN DISTRICT UNDER BURDWAN DIVISION PHE DTE , SM/13340 New Material Requisition To Resource Division RTOR000596/2023-2024 4947/BWD 10/11/2023 Resource Division 35.92 0.00 0 0
3842 PURBA BARDHAMAN Manteswar Central Mechanical GROUND WATER SUPPLY BASED PIPED WATER SUPPLY SCHEME FOR BELENDA PWSS IN MANTESHWAR BLOCK OF PURBA BARDHAMAN DISTRICT UNDER BURDWAN DIVISION PHE DTE , SM/13340 New NEW SERVICE CONNECTION FOR BELENDA PWSS TW -2. BILL/03099/2023-2024 BP-2023-24-639 15/03/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 4.64 0.00 0 0
3843 PURBA BARDHAMAN Manteswar Central Mechanical GROUND WATER SUPPLY BASED PIPED WATER SUPPLY SCHEME FOR BELENDA PWSS IN MANTESHWAR BLOCK OF PURBA BARDHAMAN DISTRICT UNDER BURDWAN DIVISION PHE DTE , SM/13340 New Quotation for new service connection for Belenda PWSS PH 1. BILL/00228/2024-2025 BP-2024-25-119 29/05/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 10.29 0.00 0 0
3844 PURBA BARDHAMAN Manteswar Burdwan Division GROUND WATER SUPPLY BASED PIPED WATER SUPPLY SCHEME FOR BELENDA PWSS IN MANTESHWAR BLOCK OF PURBA BARDHAMAN DISTRICT UNDER BURDWAN DIVISION PHE DTE , SM/13340 New Continuation work order for supply of 01 (one) No. Diesel driven Motor Cab (Bharat Stage-III) on hire basis for the office of the Assistant Engineer, Durgapur Sub-Divison(Burdwan North), P.H.E. DTE. Govt. of West Bengal (for the period of 01/08/2024 to 30/09/2024) Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer1, Durgapur Sub-Division, PHE Dte. ORD/000552/2024-2025 602/DSD 30/07/2024 61 SUJAUDDIN SEKH 0.80 0.31 38.75 100
3845 PURBA BARDHAMAN Manteswar Burdwan Division GROUND WATER SUPPLY BASED PIPED WATER SUPPLY SCHEME FOR BELENDA PWSS IN MANTESHWAR BLOCK OF PURBA BARDHAMAN DISTRICT UNDER BURDWAN DIVISION PHE DTE , SM/13340 New Continuation work order for supply of 01 (one) No. Diesel driven Motor Cab (Bharat Stage-III) on hire basis for the office of the Assistant Engineer, Durgapur Sub-Divison(Burdwan North), P.H.E. DTE. Govt. of West Bengal (for the period of 01/10/2024 to 30/11/2024) Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer1, Durgapur Sub-Division, PHE Dte. ORD/000839/2024-2025 772/DSD 18/09/2024 61 SUJAUDDIN SEKH 0.80 0.28 35 0
3846 PURBA BARDHAMAN Manteswar Burdwan Division GROUND WATER SUPPLY BASED PIPED WATER SUPPLY SCHEME FOR BELENDA PWSS IN MANTESHWAR BLOCK OF PURBA BARDHAMAN DISTRICT UNDER BURDWAN DIVISION PHE DTE , SM/13340 New Material Requisition To Resource Division RTOR000067/2024-2025 393/BWD 17/01/2025 Resource Division 8.20 0.00 0 0
3847 PURBA BARDHAMAN Manteswar Burdwan Division GROUND WATER SUPPLY BASED PIPED WATER SUPPLY SCHEME FOR BELENDA PWSS IN MANTESHWAR BLOCK OF PURBA BARDHAMAN DISTRICT UNDER BURDWAN DIVISION PHE DTE , SM/13340 New Different works related (sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of different capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site) to BELENDA, JAMNA, PIPLON & PARGUNA Piped Water Supply Scheme under Manteswar Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer1, Durgapur Sub-Division, PHE Dte. ORD/000689/2023-2024 4388/BWD 05/10/2023 667 AKASH CONSTRUCTION 2,296.40 0.00 0 50
3848 PURBA BARDHAMAN Manteswar Central Mechanical GROUND WATER SUPPLY BASED PIPED WATER SUPPLY SCHEME FOR BELENDA PWSS IN MANTESHWAR BLOCK OF PURBA BARDHAMAN DISTRICT UNDER BURDWAN DIVISION PHE DTE , SM/13340 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Sutra & others water supply scheme under Monteswar Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000068/2024-2025 2396/CMD 02/08/2024 455 SINHA ELECTRICALS 78.06 0.00 0 20
3849 PURBA BARDHAMAN Manteswar Burdwan Division GROUND WATER SUPPLY BASED PIPED WATER SUPPLY SCHEME FOR BELENDA PWSS IN MANTESHWAR BLOCK OF PURBA BARDHAMAN DISTRICT UNDER BURDWAN DIVISION PHE DTE , SM/13340 New Continuation work order for supply of 01 (one) No. Diesel driven Motor Cab (Bharat Stage-III) on hire basis for the office of the Assistant Engineer, Durgapur Sub-Divison(Burdwan North), P.H.E. DTE. Govt. of West Bengal (for the period of 01/12/2024 to 31/12/2024) Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer1, Durgapur Sub-Division, PHE Dte. ORD/000994/2024-2025 992/DSD 25/11/2024 61 SUJAUDDIN SEKH 0.40 0.00 0 0
3850 PURBA BARDHAMAN Manteswar Central Mechanical GROUND WATER SUPPLY BASED PIPED WATER SUPPLY SCHEME FOR BELENDA PWSS IN MANTESHWAR BLOCK OF PURBA BARDHAMAN DISTRICT UNDER BURDWAN DIVISION PHE DTE , SM/13340 New CONTINUATION ORDER- Hiring of inspection vehicle (Diesel/CNG/LPG Driven)for supervision of site for the office of the Assisatnt Engineer,under CMD,PHE,Dte.[W.E.F-01.04.2025 to 31.05.2025] ASSISTANT ENGINEER Junior Engineer ORD/001173/2024-2025 367/CMSD 26/03/2025 61 PRODYUT GHOSH 0.80 0.00 0 0
3851 PURBA BARDHAMAN Manteswar Central Mechanical GROUND WATER SUPPLY BASED PIPED WATER SUPPLY SCHEME FOR BELENDA PWSS IN MANTESHWAR BLOCK OF PURBA BARDHAMAN DISTRICT UNDER BURDWAN DIVISION PHE DTE , SM/13340 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at Belenda Water Supply Scheme [ Block- Monteshwar ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000911/2023-2024 4175/CMD 29/08/2023 703 SOUNAK ENTERPRISE 28.48 0.00 0 95
3852 PURBA BARDHAMAN Manteswar Burdwan Division GROUND WATER SUPPLY BASED PIPED WATER SUPPLY SCHEME FOR BELENDA PWSS IN MANTESHWAR BLOCK OF PURBA BARDHAMAN DISTRICT UNDER BURDWAN DIVISION PHE DTE , SM/13340 New Work Order for "DESIGNING,MAKING AND ERECTION OF SIGN BOARD FOR SAJAL GRAM IN ¿¿1 No...VILLAGE, ¿MANTESWAR BLOCK UNDER KALNA SUB DIVISION WITHIN BURDWAN DIVISION PHE DTE. (3nos board)" Assistant Engineer Junior Engineer, R.W.S. Burdwan Sub Division, P.H.E. Dt ORD/001424/2024-2025 1920/KSD 02/12/2024 10 OMKAR ENTERPRISE 0.42 0.00 0 0
3853 PURBA BARDHAMAN Ausgram - II Burdwan Division DHARALA PIPED WATER SUPPLY SCHEME , SM/14056 New Material Requisition To Resource Division RTOR000085/2022-2023 1240/BWD 17/03/2023 Resource Division 2.49 0.00 0 0
3854 PURBA BARDHAMAN Ausgram - II Burdwan Division DHARALA PIPED WATER SUPPLY SCHEME , SM/14056 New Material Requisition To Resource Division RTOR000105/2022-2023 1641/BWD 06/04/2023 Resource Division 0.78 0.00 0 0
3855 PURBA BARDHAMAN Ausgram - II Central Mechanical DHARALA PIPED WATER SUPPLY SCHEME , SM/14056 New New service connection charges for Dharala PWSS TW-1 BILL/00766/2023-2024 BP-2023-24-68 20/07/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 5.76 0.00 0 0
3856 PURBA BARDHAMAN Ausgram - II Burdwan Division DHARALA PIPED WATER SUPPLY SCHEME , SM/14056 New Material Requisition To Resource Division RTOR000756/2023-2024 5243/BWD 30/11/2023 Resource Division 18.50 0.00 0 0
3857 PURBA BARDHAMAN Ausgram - II Central Mechanical DHARALA PIPED WATER SUPPLY SCHEME , SM/14056 New New service connection charges for Dharala PWSS TW-2 BILL/01778/2023-2024 BP-2023-24-286 26/12/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 4.29 0.00 0 0
3858 PURBA BARDHAMAN Ausgram - II Burdwan Division DHARALA PIPED WATER SUPPLY SCHEME , SM/14056 New DHARALA [DHARALA VILLAGE] Piped Water Supply Scheme with sinking of Tube-well, LDS, Rising Main, FHTC & construction of switch rooms & boundary walls with gates and land development, drain and internal pathway at different TW site under AUSGRAM-I Block, District:- Purba-Bardhaman [NEW SCHEME]. Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer ORD/000755/2022-2023 1208/BWD 15/03/2023 90 THREE MAA ENTERPRISE 68.82 36.92 53.65 100
3859 PURBA BARDHAMAN Ausgram - II Burdwan Division DHARALA PIPED WATER SUPPLY SCHEME , SM/14056 New DHARALA [RAGHUNATHPUR VILLAGE] Piped Water Supply Scheme with sinking of Tube-well, LDS, FHTC & construction of switch rooms & boundary walls with gates and land development, drain and internal pathway at different TW site under AUSGRAM-II Block, District:- Purba-Bardhaman [NEW SCHEME]. Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer ORD/000075/2023-2024 2054/BWD 04/05/2023 90 BIPLAB GUHA 65.39 24.27 37.12 100
3860 PURBA BARDHAMAN Ausgram - II Central Mechanical DHARALA PIPED WATER SUPPLY SCHEME , SM/14056 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Chora, Kalaijhuti & others water supply scheme under Ausgram-2 Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. Driller In-Charge JUNIOR ENGINEER ORD/000143/2024-2025 2405/CMD 02/08/2024 90 NABAUDYOG ELECTRICAL ENGINEERING CO-OPERATIVE SOCIETY LTD 95.26 0.00 0 0
3861 PURBA BARDHAMAN Ausgram - II Durgapur W/S Division DHARALA PIPED WATER SUPPLY SCHEME , SM/14056 New Acceptance cum Formal Work Order for Balance works related ( LDS , FHTCs, Road Restoration of Dharala Piped Water Supply Scheme under Aushgram-II Block, of Durgapur Water supply Division, PHE Dte. Assistant Engineer-II Contractual Junior Engineer_2 ORD/000189/2024-2025 1609/DWSD 26/11/2024 90 SARKAR AGENCY 51.36 0.00 0 0
3862 PURBA BARDHAMAN Ausgram - II Durgapur W/S Division DHARALA PIPED WATER SUPPLY SCHEME , SM/14056 New Material Requisition To Resource Division RTOR000013/2024-2025 1724/F/DWSD 10/12/2024 Resource Division 5.24 0.00 0 0
3863 PURBA BARDHAMAN Ausgram - II Central Mechanical DHARALA PIPED WATER SUPPLY SCHEME , SM/14056 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at Dharala Water Supply Scheme [ Block- Ausgram-II ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. [3rd CALL] Driller In-Charge JUNIOR ENGINEER ORD/000204/2023-2024 3048/CMD 20/07/2023 651 J.S. CONSTRUCTION. 29.71 0.00 0 70
3864 PURBA BARDHAMAN Ausgram - II Durgapur W/S Division DHARALA PIPED WATER SUPPLY SCHEME , SM/14056 New Material Requisition To Resource Division RTOR000037/2024-2025 457/DWSD 17/03/2025 Resource Division 0.14 0.00 0 0
3865 PURBA BARDHAMAN Ausgram - II Burdwan Division NRISINHAPUR PIPED WATER SUPPLY SCHEME , SM/14071 New Material Requisition To Resource Division RTOR000206/2023-2024 2155/BWD 10/05/2023 Resource Division 11.86 0.00 0 0
3866 PURBA BARDHAMAN Ausgram - II Burdwan Division NRISINHAPUR PIPED WATER SUPPLY SCHEME , SM/14071 New Material Requisition To Resource Division RTOR000450/2023-2024 3974/BWD 08/09/2023 Resource Division 1.93 0.00 0 0
3867 PURBA BARDHAMAN Ausgram - II Burdwan Division NRISINHAPUR PIPED WATER SUPPLY SCHEME , SM/14071 New Material Requisition To Resource Division RTOR000598/2023-2024 4904/BWD 10/11/2023 Resource Division 33.07 0.00 0 0
3868 PURBA BARDHAMAN Ausgram - II Central Mechanical NRISINHAPUR PIPED WATER SUPPLY SCHEME , SM/14071 New New service connection charges for Nrisinhapur PWSS TW-1 BILL/01826/2023-2024 BP-2023-24-328 03/01/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 5.56 0.00 0 0
3869 PURBA BARDHAMAN Ausgram - II Central Mechanical NRISINHAPUR PIPED WATER SUPPLY SCHEME , SM/14071 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at NRISINHAPUR Water Supply Scheme [ Block- AUSGRAM-2] under CMD, PHE Dte., Dist.- Purba-Bardhaman. Driller In-Charge JUNIOR ENGINEER ORD/000820/2023-2024 4097/CMD 29/08/2023 30 P.K. ENGINEERING 28.96 0.00 0 48
3870 PURBA BARDHAMAN Ausgram - II Burdwan Division NRISINHAPUR PIPED WATER SUPPLY SCHEME , SM/14071 New Sinking of Tube-wells, LDS, Rising Main, FHTC, Construction of 250 cum capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation, construction of switch rooms, boundary walls with gates, land development, internal drains and internal pathways for NRISINHAPUR Piped Water Supply Scheme under Ausgram-II Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer ORD/000353/2023-2024 3066/BWD 17/07/2023 365 M/S H.R. CONSTRUCTION 401.37 30.27 7.54 50
3871 PURBA BARDHAMAN Ausgram - II Central Mechanical NRISINHAPUR PIPED WATER SUPPLY SCHEME , SM/14071 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Chora, Kalaijhuti & others water supply scheme under Ausgram-2 Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. Driller In-Charge JUNIOR ENGINEER ORD/000143/2024-2025 2405/CMD 02/08/2024 90 NABAUDYOG ELECTRICAL ENGINEERING CO-OPERATIVE SOCIETY LTD 95.26 0.00 0 0
3872 PURBA BARDHAMAN Ausgram - II Central Mechanical NRISINHAPUR PIPED WATER SUPPLY SCHEME , SM/14071 New New service connection charges for Nrisinhapur PWSS TW-2 BILL/00823/2024-2025 BP-2024-25-318 30/09/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 6.63 0.00 0 0
3873 PURBA BARDHAMAN Ausgram - II Durgapur W/S Division NRISINHAPUR PIPED WATER SUPPLY SCHEME , SM/14071 New Acceptance cum Formal Work Order for Balance work for NIRSINHAPUR Piped Water Supply Scheme i.e , Construction work LDS, construction of switch rooms & boundary walls with gates and land development, drain and internal pathway etc. at 3rd Pump house site under AUSGRAM-II Block, District:- Purba-Bardhaman, under Durgapur W/S Division, PHE Dte. Assistant Engineer-II JUNIOR ENGINEER-1 ORD/000184/2024-2025 1594/DWSD 25/11/2024 90 KIRON ENTERPRISE 59.79 0.00 0 0
3874 PURBA BARDHAMAN Ausgram - II Durgapur W/S Division NRISINHAPUR PIPED WATER SUPPLY SCHEME , SM/14071 New Material Requisition To Resource Division RTOR000019/2024-2025 1724/D/DWSD 10/12/2024 Resource Division 2.00 0.00 0 0
3875 PURBA BARDHAMAN Galsi - II Burdwan Division SHYAMSUNDARPUR PIPED WATER SUPPLY SCHEME , SM/14074 New Material Requisition To Resource Division RTOR000034/2023-2024 1962/BWD 25/04/2023 Resource Division 53.00 0.00 0 0
3876 PURBA BARDHAMAN Galsi - II Burdwan Division SHYAMSUNDARPUR PIPED WATER SUPPLY SCHEME , SM/14074 New Material Requisition To Resource Division RTOR000328/2023-2024 2197/BWD 12/05/2023 Resource Division 13.76 0.00 0 0
3877 PURBA BARDHAMAN Galsi - II Central Mechanical SHYAMSUNDARPUR PIPED WATER SUPPLY SCHEME , SM/14074 New Quotation for new electric service connection at Shyamsundarpur PH NO.-1 BILL/01743/2023-2024 BP-2023-24-246 07/12/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 10.34 0.00 0 0
3878 PURBA BARDHAMAN Galsi - II Central Mechanical SHYAMSUNDARPUR PIPED WATER SUPPLY SCHEME , SM/14074 New New service connection for SHYAMSUNDARPUR PWSS TW 2. BILL/02447/2023-2024 BP-2023-24-522 09/02/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 4.00 0.00 0 0
3879 PURBA BARDHAMAN Galsi - II Central Mechanical SHYAMSUNDARPUR PIPED WATER SUPPLY SCHEME , SM/14074 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Satinandi,Sanko & others water supply scheme under Galsi-1 Block ; Serpur, Uchalan & others water supply scheme under Raina-2 Block and maro, loapur & others water supply scheme under Galsi-2 block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000397/2024-2025 2751/CMD 24/09/2024 90 ORIENTAL ENGINEERING CO. 88.42 0.00 0 0
3880 PURBA BARDHAMAN Galsi - II Central Mechanical SHYAMSUNDARPUR PIPED WATER SUPPLY SCHEME , SM/14074 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at SHYAMSUNDARPUR Water Supply Scheme [ Block- GALSI-2] under CMD, PHE Dte., Dist.- Purba-Bardhaman. Driller In-Charge JUNIOR ENGINEER ORD/000838/2023-2024 4112/CMD 29/08/2023 30 CHOUDHURY ENTERPRISE 27.73 1.09 3.93 48
3881 PURBA BARDHAMAN Galsi - II Burdwan Division SHYAMSUNDARPUR PIPED WATER SUPPLY SCHEME , SM/14074 New Different works related (sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of different capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site) to SHYAMSUNDARPUR & BELGRAM Piped Water Supply Scheme under Galsi-II Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer ,JUNIOR ENGINEER DURGAPUR SUB-DIVISION PHE DTE ORD/000086/2023-2024 2147/BWD 10/05/2023 730 MAHMOOD ASSOCIATES PVT. LTD. 1,172.24 6.46 0.55 78
3882 PURBA BARDHAMAN Burdwan - I Burdwan Division BAKALSA PIPED WATER SUPPLY SCHEME , SM/13944 New Material Requisition To Resource Division RTOR000090/2023-2024 1962/BWD 25/04/2023 Resource Division 3.25 0.00 0 0
3883 PURBA BARDHAMAN Burdwan - I Burdwan Division BAKALSA PIPED WATER SUPPLY SCHEME , SM/13944 New Material Requisition To Resource Division RTOR000222/2023-2024 2155/BWD 10/05/2023 Resource Division 21.15 0.00 0 0
3884 PURBA BARDHAMAN Burdwan - I Burdwan Division BAKALSA PIPED WATER SUPPLY SCHEME , SM/13944 New Material Requisition To Resource Division RTOR000575/2023-2024 4893/BWD 10/11/2023 Resource Division 6.50 0.00 0 0
3885 PURBA BARDHAMAN Burdwan - I Burdwan Division BAKALSA PIPED WATER SUPPLY SCHEME , SM/13944 New Material Requisition To Resource Division RTOR000708/2023-2024 5041/BWD 23/11/2023 Resource Division 20.46 0.00 0 0
3886 PURBA BARDHAMAN Burdwan - I Central Mechanical BAKALSA PIPED WATER SUPPLY SCHEME , SM/13944 New New service connection charges for Bakalsa PWSS TW-1 BILL/01828/2023-2024 BP-2023-24-336 06/01/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 4.04 0.00 0 0
3887 PURBA BARDHAMAN Burdwan - I Central Mechanical BAKALSA PIPED WATER SUPPLY SCHEME , SM/13944 New New service connection for Bakalsa PWSS. BILL/02248/2023-2024 BP-2023-24-395 17/01/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.99 0.00 0 0
3888 PURBA BARDHAMAN Burdwan - I Burdwan Division BAKALSA PIPED WATER SUPPLY SCHEME , SM/13944 New Supply, delivery, installation & hand hold demonstration of different equipments / machineries to test HDPE pipes as per IS: 4984-2016 at the pipe testing laboratory at Nababhat under Burdwan Division, PHE. Dte._2ND CALL AE(HQs) J.E. 1 BURDWAN ORD/001212/2023-2024 907/BWD 04/03/2024 30 MANASH GHOSH 23.87 0.00 0 100
3889 PURBA BARDHAMAN Burdwan - I Central Mechanical BAKALSA PIPED WATER SUPPLY SCHEME , SM/13944 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at MALKITA & others water supply scheme under Bardhaman-I Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman ASSISTANT ENGINEER Junior Engineer ORD/000066/2024-2025 2388/CMD 02/08/2024 90 ELECTRICAL & MECHANICAL ENGINEERING CORPORATION 55.95 0.00 0 0
3890 PURBA BARDHAMAN Burdwan - I Central Mechanical BAKALSA PIPED WATER SUPPLY SCHEME , SM/13944 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Rajur & others water supply scheme under Ketugram-I Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. Driller In-Charge Junior Engineer ORD/000098/2024-2025 2407/CMD 02/08/2024 90 M.S. ENTERPRISE 82.29 0.00 0 0
3891 PURBA BARDHAMAN Burdwan - I Burdwan Division BAKALSA PIPED WATER SUPPLY SCHEME , SM/13944 New Sinking of Tube-wells, LDS, Rising Main, FHTC, Construction of 300 cum capacity RCC OHR with 20.0 mtr. with Staging height including soil investigation, construction of switch room, boundary walls with gates, land development, surface drains and internal pathways at different TW site for BAKALSA Piped Water Supply Scheme under BURDWAN-I Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JE (RWS) Burdwan-I Block ORD/000573/2023-2024 3723/BWD 25/08/2023 365 M/S GHOSH & CO. 534.23 0.00 0 25
3892 PURBA BARDHAMAN Burdwan - I Burdwan Division JAGADABAD PIPED WATER SUPPLY SCHEME , SM/13945 New Material Requisition To Resource Division RTOR000094/2023-2024 1962/BWD 25/04/2023 Resource Division 8.29 0.00 0 0
3893 PURBA BARDHAMAN Burdwan - I Burdwan Division JAGADABAD PIPED WATER SUPPLY SCHEME , SM/13945 New Material Requisition To Resource Division RTOR000286/2023-2024 2197/BWD 12/05/2023 Resource Division 17.21 0.00 0 0
3894 PURBA BARDHAMAN Burdwan - I Central Mechanical JAGADABAD PIPED WATER SUPPLY SCHEME , SM/13945 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at Jagadbad Water Supply Scheme [ Block- Burdwan-1 ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER Junior Engineer ORD/000654/2023-2024 3997/CMD 29/08/2023 30 CHOUDHURY ENTERPRISE 28.93 0.00 0 0
3895 PURBA BARDHAMAN Burdwan - I Burdwan Division JAGADABAD PIPED WATER SUPPLY SCHEME , SM/13945 New Material Requisition To Resource Division RTOR000718/2023-2024 5274/BWD 30/11/2023 Resource Division 21.07 0.00 0 0
3896 PURBA BARDHAMAN Burdwan - I Central Mechanical JAGADABAD PIPED WATER SUPPLY SCHEME , SM/13945 New NEW SERVICE CONNECTION FOR JAGDABAD PWSS PH-1. BILL/02872/2023-2024 BP-2023-24-609 06/03/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 0.65 0.00 0 0
3897 PURBA BARDHAMAN Burdwan - I Central Mechanical JAGADABAD PIPED WATER SUPPLY SCHEME , SM/13945 New NEW SERVICE CONNECTION FOR JAGDABAD PWSS PH-2. BILL/02873/2023-2024 BP-2023-24-608 06/03/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 10.21 0.00 0 0
3898 PURBA BARDHAMAN Burdwan - I Central Mechanical JAGADABAD PIPED WATER SUPPLY SCHEME , SM/13945 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at MALKITA & others water supply scheme under Bardhaman-I Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman ASSISTANT ENGINEER Junior Engineer ORD/000066/2024-2025 2388/CMD 02/08/2024 90 ELECTRICAL & MECHANICAL ENGINEERING CORPORATION 55.95 0.00 0 0
3899 PURBA BARDHAMAN Burdwan - I Burdwan Division JAGADABAD PIPED WATER SUPPLY SCHEME , SM/13945 New Different works related (sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of different capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site) to BARASAT, JAGADABAD & KHAIDYA Piped Water Supply Scheme under BURDWAN-I Block, District:- Purba Bardhaman [NEW SCHEME] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. J.E. 1 BURDWAN ORD/000465/2023-2024 3460/BWD 08/08/2023 783 CONCORD EMC ENCLAVE LLP 1,526.24 0.00 0 45
3900 PURBA BARDHAMAN Raina - II Burdwan Division Serpur Piped Water Supply Scheme , SM/13384 New Material Requisition To Resource Division RTOR000301/2023-2024 2197/BWD 12/05/2023 Resource Division 7.90 0.00 0 0
3901 PURBA BARDHAMAN Raina - II Burdwan Division Serpur Piped Water Supply Scheme , SM/13384 New Material Requisition To Resource Division RTOR000483/2023-2024 4007/BWD 08/09/2023 Resource Division 2.05 0.00 0 0
3902 PURBA BARDHAMAN Raina - II Burdwan Division Serpur Piped Water Supply Scheme , SM/13384 New Material Requisition To Resource Division RTOR000692/2023-2024 5073/BWD 23/11/2023 Resource Division 20.46 0.00 0 0
3903 PURBA BARDHAMAN Raina - II Central Mechanical Serpur Piped Water Supply Scheme , SM/13384 New New Service connection for Serpur W/S Scheme PH No.-I BILL/01797/2023-2024 BP-2023-24-301 30/12/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.35 0.00 0 0
3904 PURBA BARDHAMAN Raina - II Central Mechanical Serpur Piped Water Supply Scheme , SM/13384 New NEW SERVICE CONNECTION FOR SERPUR PWSS PH-2 BILL/00107/2024-2025 BP-2024-25-43 26/04/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 4.23 0.00 0 0
3905 PURBA BARDHAMAN Raina - II Central Mechanical Serpur Piped Water Supply Scheme , SM/13384 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Satinandi,Sanko & others water supply scheme under Galsi-1 Block ; Serpur, Uchalan & others water supply scheme under Raina-2 Block and maro, loapur & others water supply scheme under Galsi-2 block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000397/2024-2025 2751/CMD 24/09/2024 90 ORIENTAL ENGINEERING CO. 88.42 0.00 0 0
3906 PURBA BARDHAMAN Raina - II Burdwan Division Serpur Piped Water Supply Scheme , SM/13384 New Different works related (sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of different capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site) to UCHALAN, CHAK CHANDAN, SERPUR & KATNABIL Piped Water Supply Scheme under Raina II Block, District:- Purba Bardhaman [NEW SCHEME] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000367/2023-2024 3076/BWD 18/07/2023 806 SK ALIM 1,307.56 0.00 0 40
3907 PURBA BARDHAMAN Raina - II Central Mechanical Serpur Piped Water Supply Scheme , SM/13384 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at Serpur Water Supply Scheme [ Block- Raina-2 ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000651/2023-2024 3994/CMD 29/08/2023 549 S.P. CONSTRUCTION 28.92 0.00 0 80
3908 PURBA BARDHAMAN Raina - II Burdwan Division Serpur Piped Water Supply Scheme , SM/13384 New Continuation Work Order for supply of inspection Vehicle No. WB42Y- 7403 for inspection of different JJM related(schemes) works as and when required including supply of driver & fuel(minimum 8 hours duty per day) and all taxes etc. for Burdwan Sub Division under Burdwan Division, PHE Dte consider 96.00 Km. run per day (Period from 01-02-2025 to 30-04-2025) JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/001402/2024-2025 240/BSD 31/01/2025 66 PARVIN BEGAM 0.85 0.00 0 0
3909 PURBA BARDHAMAN Burdwan - I Central Mechanical MALKITA PIPED WATER SUPPLY SINGLE VILLAGE SCHEME , SM/14080 New New service connection charges for Malkita PWSS TW-1 BILL/00837/2023-2024 BP-2023-24-102 04/08/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 4.26 0.00 0 0
3910 PURBA BARDHAMAN Burdwan - I Central Mechanical MALKITA PIPED WATER SUPPLY SINGLE VILLAGE SCHEME , SM/14080 New New service connection charges for Malkita PWSS TW-2 BILL/00838/2023-2024 BP-2023-24-103 04/08/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.25 0.00 0 0
3911 PURBA BARDHAMAN Burdwan - I Burdwan Division MALKITA PIPED WATER SUPPLY SINGLE VILLAGE SCHEME , SM/14080 New Material Requisition To Resource Division RTOR000442/2023-2024 3834/BWD 01/09/2023 Resource Division 5.48 0.00 0 0
3912 PURBA BARDHAMAN Burdwan - I Burdwan Division MALKITA PIPED WATER SUPPLY SINGLE VILLAGE SCHEME , SM/14080 New Material Requisition To Resource Division RTOR000677/2023-2024 5052/BWD 23/11/2023 Resource Division 20.46 0.00 0 0
3913 PURBA BARDHAMAN Burdwan - I Central Mechanical MALKITA PIPED WATER SUPPLY SINGLE VILLAGE SCHEME , SM/14080 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at Malkita Water Supply Scheme [ Block- Burdwan-1 ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER Junior Engineer ORD/000211/2023-2024 3067/CMD 21/07/2023 30 S.P. CONSTRUCTION 28.96 0.00 0 90
3914 PURBA BARDHAMAN Burdwan - I Burdwan Division MALKITA PIPED WATER SUPPLY SINGLE VILLAGE SCHEME , SM/14080 New MALKITA Single Village Scheme with LDS, Rising Main and FHTC under Burdwan-I Block, District:- Purba-Bardhaman [NEW SCHEME]. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000158/2023-2024 2454/BWD 31/05/2023 90 M/S PURBASHA 71.78 40.92 57.01 72
3915 PURBA BARDHAMAN Burdwan - I Burdwan Division MALKITA PIPED WATER SUPPLY SINGLE VILLAGE SCHEME , SM/14080 New MALKITA Single Village Scheme with sinking of Tube-well & construction of switch rooms & boundary walls with gates and land development, drain and internal pathway at different TW site under Burdwan-I Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000054/2023-2024 1933/BWD 24/04/2023 90 GHOSH CONSTRUCTION 49.99 24.54 49.09 100
3916 PURBA BARDHAMAN Burdwan - I Central Mechanical MALKITA PIPED WATER SUPPLY SINGLE VILLAGE SCHEME , SM/14080 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at MALKITA & others water supply scheme under Bardhaman-I Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman ASSISTANT ENGINEER Junior Engineer ORD/000066/2024-2025 2388/CMD 02/08/2024 90 ELECTRICAL & MECHANICAL ENGINEERING CORPORATION 55.95 0.00 0 0
3917 PURBA BARDHAMAN Burdwan - I Burdwan Division MALKITA PIPED WATER SUPPLY SINGLE VILLAGE SCHEME , SM/14080 New Material Requisition To Resource Division RTOR000052/2024-2025 332/BWD 15/01/2025 Resource Division 3.72 0.00 0 0
3918 PURBA BARDHAMAN Burdwan - I Burdwan Division MALKITA PIPED WATER SUPPLY SINGLE VILLAGE SCHEME , SM/14080 New Installation of Sluice Valve, Washout Valve to regulate water supply with Road Restoration work, Extension pipeline and providing FHTC for MALKITA Piped Water Supply Scheme, Block- Burdwan-I, under Burdwan sub Division within Burdwan Division PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/001163/2024-2025 552/BWD 04/02/2025 90 M/S PURBASHA 9.62 0.00 0 0
3919 PURBA BARDHAMAN Khandaghosh Burdwan Division AMRA PIPED WATER SUPPLY SCHEME , SM/13454 New Material Requisition To Resource Division RTOR000194/2023-2024 2155/BWD 10/05/2023 Resource Division 15.41 0.00 0 0
3920 PURBA BARDHAMAN Khandaghosh Central Mechanical AMRA PIPED WATER SUPPLY SCHEME , SM/13454 New New service connection charges for Amra PWSS TW-2 BILL/01475/2023-2024 BP-2023-24-173 29/09/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 6.42 0.00 0 0
3921 PURBA BARDHAMAN Khandaghosh Central Mechanical AMRA PIPED WATER SUPPLY SCHEME , SM/13454 New New service connection charges for Amra PWSS TW-1 BILL/01474/2023-2024 BP-2023-24-172 29/09/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.84 0.00 0 0
3922 PURBA BARDHAMAN Khandaghosh Burdwan Division AMRA PIPED WATER SUPPLY SCHEME , SM/13454 New Material Requisition To Resource Division RTOR000702/2023-2024 5049/BWD 23/11/2023 Resource Division 20.46 0.00 0 0
3923 PURBA BARDHAMAN Khandaghosh Central Mechanical AMRA PIPED WATER SUPPLY SCHEME , SM/13454 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at KHEJURHATI & others water supply scheme under Khandoghosh Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman ASSISTANT ENGINEER Junior Engineer ORD/000071/2024-2025 2391/CMD 02/08/2024 90 C.M. ENTERPRISE 45.81 0.00 0 0
3924 PURBA BARDHAMAN Khandaghosh Central Mechanical AMRA PIPED WATER SUPPLY SCHEME , SM/13454 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at Amra Water Supply Scheme [ Block- Khandogosh ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000678/2023-2024 4010/CMD 29/08/2023 30 M/S. SWAPAN BANERJEE 28.98 0.00 0 20
3925 PURBA BARDHAMAN Khandaghosh Central Mechanical AMRA PIPED WATER SUPPLY SCHEME , SM/13454 New Supply & fitting fixing of FASD motor starter (for urgent FHTC) for Tube well no.-I & II at Amra water supply scheme, (Block- Khandaghosh) under CMD, PHE Dte., Dist.- Purba-Bardhaman ASSISTANT ENGINEER Junior Engineer ORD/000268/2024-2025 743/CMSD 13/05/2024 10 M/S. SWAPAN BANERJEE 0.60 0.60 100 100
3926 PURBA BARDHAMAN Khandaghosh Burdwan Division AMRA PIPED WATER SUPPLY SCHEME , SM/13454 New Surveying, planning, design, drawing and construction of pipe carrying structural bridge for carrying 200 mm. dia. D.I. Pipe line at AMRA Piped W/S. Scheme, Khandaghosh Dev. Block under Durgapur (Burdwan North) Sub-Division, PHE. Dte. within Burdwan Division, PHE. Dte. Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer1, Durgapur Sub-Division, PHE Dte. ORD/000831/2024-2025 4085/BWD 22/11/2024 90 S.P. CONSTRUCTION 149.75 0.00 0 0
3927 PURBA BARDHAMAN Khandaghosh Burdwan Division AMRA PIPED WATER SUPPLY SCHEME , SM/13454 New Balance work for providing Functional Household Tap Connection (FHTC) within the command area BALABATI, AMRA & RUPSA W/S. Scheme of Khandaghosh Block under Burdwan Division, PHE. Dte. Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer1, Durgapur Sub-Division, PHE Dte. ORD/001189/2024-2025 609/BWD 11/02/2025 120 M/S S.S. ENTERPRISE 194.58 0.00 0 0
3928 PURBA BARDHAMAN Khandaghosh Burdwan Division AMRA PIPED WATER SUPPLY SCHEME , SM/13454 New Different works related (sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of different capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site) to AMRA, BALABATI, UKHRID & RUPSA Piped Water Supply Scheme under KHANDAGHOSH Block, District:- Purba Bardhaman [NEW SCHEME] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer1, Durgapur Sub-Division, PHE Dte.,Junior Engineer2, Durgapur Sub-Division, PHE Dte. ORD/000008/2023-2024 1726/BWD 13/04/2023 902 S.P. CONSTRUCTION 1,710.27 198.05 11.58 45
3929 PURBA BARDHAMAN Khandaghosh Burdwan Division BALABATI PIPED WATER SUPPLY SCHEME , SM/13457 New Material Requisition To Resource Division RTOR000076/2023-2024 1962/BWD 25/04/2023 Resource Division 2.20 0.00 0 0
3930 PURBA BARDHAMAN Khandaghosh Burdwan Division BALABATI PIPED WATER SUPPLY SCHEME , SM/13457 New Material Requisition To Resource Division RTOR000167/2023-2024 2155/BWD 10/05/2023 Resource Division 9.06 0.00 0 0
3931 PURBA BARDHAMAN Khandaghosh Burdwan Division BALABATI PIPED WATER SUPPLY SCHEME , SM/13457 New Material Requisition To Resource Division RTOR000709/2023-2024 5048/BWD 23/11/2023 Resource Division 20.46 0.00 0 0
3932 PURBA BARDHAMAN Khandaghosh Central Mechanical BALABATI PIPED WATER SUPPLY SCHEME , SM/13457 New Electric quotation for New Service Connection at Balabati W/S Scehem PH-2. BILL/01773/2023-2024 BP-2023-24-284 26/12/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 4.71 0.00 0 0
3933 PURBA BARDHAMAN Khandaghosh Central Mechanical BALABATI PIPED WATER SUPPLY SCHEME , SM/13457 New New service connection charges for Balabati PWSS TW-1 BILL/01777/2023-2024 BP-2023-24-283 26/12/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 2.89 0.00 0 0
3934 PURBA BARDHAMAN Khandaghosh Central Mechanical BALABATI PIPED WATER SUPPLY SCHEME , SM/13457 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at KHEJURHATI & others water supply scheme under Khandoghosh Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman ASSISTANT ENGINEER Junior Engineer ORD/000071/2024-2025 2391/CMD 02/08/2024 90 C.M. ENTERPRISE 45.81 0.00 0 0
3935 PURBA BARDHAMAN Khandaghosh Burdwan Division BALABATI PIPED WATER SUPPLY SCHEME , SM/13457 New Balance work for providing Functional Household Tap Connection (FHTC) within the command area BALABATI, AMRA & RUPSA W/S. Scheme of Khandaghosh Block under Burdwan Division, PHE. Dte. Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer1, Durgapur Sub-Division, PHE Dte. ORD/001189/2024-2025 609/BWD 11/02/2025 120 M/S S.S. ENTERPRISE 194.58 0.00 0 0
3936 PURBA BARDHAMAN Khandaghosh Burdwan Division BALABATI PIPED WATER SUPPLY SCHEME , SM/13457 New Different works related (sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of different capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site) to AMRA, BALABATI, UKHRID & RUPSA Piped Water Supply Scheme under KHANDAGHOSH Block, District:- Purba Bardhaman [NEW SCHEME] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer1, Durgapur Sub-Division, PHE Dte.,Junior Engineer2, Durgapur Sub-Division, PHE Dte. ORD/000008/2023-2024 1726/BWD 13/04/2023 902 S.P. CONSTRUCTION 1,710.27 0.00 0 45
3937 PURBA BARDHAMAN Khandaghosh Central Mechanical BALABATI PIPED WATER SUPPLY SCHEME , SM/13457 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at Balabati Water Supply Scheme [ Block- Khandogosh ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER Junior Engineer ORD/000679/2023-2024 4011/CMD 29/08/2023 369 UNIVERSAL ENTERPRISES 28.95 11.39 39.34 100
3938 PURBA BARDHAMAN Bhatar Burdwan Division MAHATA PIPED WATER SUPPLY SCHEME , SM/15242 New Material Requisition To Resource Division RTOR000068/2023-2024 1962/BWD 25/04/2023 Resource Division 45.74 0.00 0 0
3939 PURBA BARDHAMAN Bhatar Burdwan Division MAHATA PIPED WATER SUPPLY SCHEME , SM/15242 New Material Requisition To Resource Division RTOR000169/2023-2024 2155/BWD 10/05/2023 Resource Division 5.19 0.00 0 0
3940 PURBA BARDHAMAN Bhatar Burdwan Division MAHATA PIPED WATER SUPPLY SCHEME , SM/15242 New Material Requisition To Resource Division RTOR000578/2023-2024 4926/BWD 10/11/2023 Resource Division 37.58 0.00 0 0
3941 PURBA BARDHAMAN Bhatar Central Mechanical MAHATA PIPED WATER SUPPLY SCHEME , SM/15242 New New service connection charges for Mahata PWSS TW-1 BILL/01830/2023-2024 BP-2023-24-338 06/01/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 10.54 0.00 0 0
3942 PURBA BARDHAMAN Bhatar Central Mechanical MAHATA PIPED WATER SUPPLY SCHEME , SM/15242 New New Service connection at Mahata PWSS PH-1 BILL/02318/2023-2024 BP-2023-24-538 15/02/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 7.24 0.00 0 0
3943 PURBA BARDHAMAN Bhatar Central Mechanical MAHATA PIPED WATER SUPPLY SCHEME , SM/15242 New ADDITIONAL CONNECTION FOR MAHATA PWSS PH-1. BILL/02875/2023-2024 BP-2023-24-599 06/03/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 8.10 0.00 0 0
3944 PURBA BARDHAMAN Bhatar Central Mechanical MAHATA PIPED WATER SUPPLY SCHEME , SM/15242 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Karjana & others water supply scheme under Bhatar Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000067/2024-2025 2394/CMD 02/08/2024 90 AHALYA ENGINEERING WORKS 82.00 0.00 0 0
3945 PURBA BARDHAMAN Bhatar Central Mechanical MAHATA PIPED WATER SUPPLY SCHEME , SM/15242 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at MAHATA Water Supply Scheme [ Block- BHATAR] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000822/2023-2024 4099/CMD 29/08/2023 30 BENGAL CONSTRUCTION. 27.79 0.00 0 90
3946 PURBA BARDHAMAN Bhatar Burdwan Division MAHATA PIPED WATER SUPPLY SCHEME , SM/15242 New Continuation for the work of Supply of Inspection Vehicle for inspection of different JJM related (Schemes) works as and when required including supply of driver & fuel (minimum 8 Hours duty per day) and all taxes etc. for Durgapur Sub-Division under BurdwanDivision, P.H.E. Dte.consider 96.00 Km. run per day [Period AUG.'2024 to OCT.'2024] ORD/000845/2024-2025 575/DSD 19/07/2024 78 MD HASIN 1.00 0.00 0 0
3947 PURBA BARDHAMAN Bhatar Burdwan Division MAHATA PIPED WATER SUPPLY SCHEME , SM/15242 New Different works related (sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of different capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site) to DHENRIA, MAHATA, DEBPUR Piped Water Supply Scheme under BHATAR Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer2, Durgapur Sub-Division, PHE Dte. ORD/000019/2023-2024 1737/BWD 13/04/2023 719 M/S B. RAI CONSTRUCTION COMPANY 1,643.39 0.00 0 52
3948 PURBA BARDHAMAN Bhatar Burdwan Division MAHATA PIPED WATER SUPPLY SCHEME , SM/15242 New Material Requisition To Resource Division RTOR000073/2024-2025 399/BWD 17/01/2025 Resource Division 5.59 0.00 0 0
3949 PURBA BARDHAMAN Bhatar Burdwan Division MAHATA PIPED WATER SUPPLY SCHEME , SM/15242 New FOR FIXING OF DISPLAY BOARD WITH M.S STRUCTURE CONTAINING SCHEME DESCRIPTION AT KHEJURHATI PWSS AND OTHER SCHEMES ( 16 Nos) WITHIN BHATAR BLOCK UNDER BURDWAN DIVISION , PHE Dte. ORD/001422/2024-2025 298/DSD 20/02/2025 21 SHUBHRA KANTI GHOSH 1.39 0.00 0 0
3950 PURBA BARDHAMAN Bhatar Burdwan Division DHENRIA PIPED WATER SUPPLY SCHEME , SM/15246 New Material Requisition To Resource Division RTOR000067/2023-2024 1962/BWD 25/04/2023 Resource Division 31.52 0.00 0 0
3951 PURBA BARDHAMAN Bhatar Burdwan Division DHENRIA PIPED WATER SUPPLY SCHEME , SM/15246 New Material Requisition To Resource Division RTOR000171/2023-2024 2155/BWD 10/05/2023 Resource Division 8.61 0.00 0 0
3952 PURBA BARDHAMAN Bhatar Central Mechanical DHENRIA PIPED WATER SUPPLY SCHEME , SM/15246 New New service connection charges for Dhenria PWSS TW-1 BILL/01418/2023-2024 BP-2023-24-147 31/08/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 5.27 0.00 0 0
3953 PURBA BARDHAMAN Bhatar Central Mechanical DHENRIA PIPED WATER SUPPLY SCHEME , SM/15246 New New service connection charges for Dhenria PWSS TW-2 BILL/01473/2023-2024 BP-2023-24-167 27/09/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.71 0.00 0 0
3954 PURBA BARDHAMAN Bhatar Burdwan Division DHENRIA PIPED WATER SUPPLY SCHEME , SM/15246 New Material Requisition To Resource Division RTOR000586/2023-2024 4930/BWD 10/11/2023 Resource Division 34.57 0.00 0 0
3955 PURBA BARDHAMAN Bhatar Burdwan Division DHENRIA PIPED WATER SUPPLY SCHEME , SM/15246 New Material Requisition To Resource Division RTOR000782/2023-2024 325/BWD 24/01/2024 Resource Division 6.44 0.00 0 0
3956 PURBA BARDHAMAN Bhatar Central Mechanical DHENRIA PIPED WATER SUPPLY SCHEME , SM/15246 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at DHENRIA Water Supply Scheme [ Block-BHATAR ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000559/2023-2024 3872/CMD 17/08/2023 30 M/S, S.S. ENTERPRISE. 27.79 0.00 0 90
3957 PURBA BARDHAMAN Bhatar Central Mechanical DHENRIA PIPED WATER SUPPLY SCHEME , SM/15246 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Karjana & others water supply scheme under Bhatar Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000067/2024-2025 2394/CMD 02/08/2024 90 AHALYA ENGINEERING WORKS 82.00 0.00 0 0
3958 PURBA BARDHAMAN Bhatar Burdwan Division DHENRIA PIPED WATER SUPPLY SCHEME , SM/15246 New Continuation for the work of Supply of Inspection Vehicle for inspection of different JJM related (Schemes) works as and when required including supply of driver & fuel (minimum 8 Hours duty per day) and all taxes etc. for Durgapur Sub-Division under BurdwanDivision, P.H.E. Dte.consider 96.00 Km. run per day [Period NOV.'2024 to JAN.'2025] ORD/000847/2024-2025 886/DSD 21/10/2024 78 MD HASIN 1.00 0.00 0 0
3959 PURBA BARDHAMAN Bhatar Burdwan Division DHENRIA PIPED WATER SUPPLY SCHEME , SM/15246 New Different works related (sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of different capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site) to DHENRIA, MAHATA, DEBPUR Piped Water Supply Scheme under BHATAR Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer2, Durgapur Sub-Division, PHE Dte. ORD/000019/2023-2024 1737/BWD 13/04/2023 719 M/S B. RAI CONSTRUCTION COMPANY 1,643.39 0.00 0 52
3960 PURBA BARDHAMAN Bhatar Burdwan Division DHENRIA PIPED WATER SUPPLY SCHEME , SM/15246 New Continuation for the work of Supply of Inspection Vehicle for inspection of different JJM related (Schemes) works as and when required including supply of driver & fuel (minimum 8 Hours duty per day) and all taxes etc. for Durgapur Sub-Division under Burdwan Division, P.H.E. Dte.consider 96.00 Km. run per day. [PeriodFebruary.'2025 to April'2025] ORD/001180/2024-2025 129/DSD 29/01/2025 78 MD HASIN 1.00 0.00 0 0
3961 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap connection (FHTC) by retrofitting within the command area of Jot Raghab Piped Water Supply Scheme at Jamalpur Block under Burdwan Division, P.H.E. DTE. , SM/08708 Retrofitting Quotation for payment of service connection charge on full deposit scheme of Jotraghab w/s scheme. VCH/000631/2022-2023 724/DW/22-23 03/11/2022 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LTD. 1.76 0.00 0 0
3962 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap connection (FHTC) by retrofitting within the command area of Jot Raghab Piped Water Supply Scheme at Jamalpur Block under Burdwan Division, P.H.E. DTE. , SM/08708 Retrofitting Quotation for payment of service connection charges for Augmentation of Jotraghab w/s scheme. VCH/000632/2022-2023 725/DW/22-23 03/11/2022 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LTD. 0.33 0.00 0 0
3963 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap connection (FHTC) by retrofitting within the command area of Jot Raghab Piped Water Supply Scheme at Jamalpur Block under Burdwan Division, P.H.E. DTE. , SM/08708 Retrofitting Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of JOTRAGHAB Piped Water Supply Scheme at (JOTKRISHTAI) Mouza under Jamalpur Block of Burdwan Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000486/2022-2023 4007/BWD 15/09/2022 30 PAL CONSTRUCTION 13.87 13.63 98.27 1
3964 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap connection (FHTC) by retrofitting within the command area of Jot Raghab Piped Water Supply Scheme at Jamalpur Block under Burdwan Division, P.H.E. DTE. , SM/08708 Retrofitting Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of JOTRAGHAB Piped Water Supply Scheme at Jotraghab & Radhaballabbati Mouza), Jamalpur Block under Burdwan Division, PHE. Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000058/2022-2023 2239/BWD 02/05/2022 45 MAJUMDER ENTERPRISE 54.07 48.26 89.25 1
3965 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap connection (FHTC) by retrofitting within the command area of Jot Raghab Piped Water Supply Scheme at Jamalpur Block under Burdwan Division, P.H.E. DTE. , SM/08708 Retrofitting Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of JOTRAGHAB Piped Water Supply Scheme at (JOTRAGHAB, RADHABALLAB BATI, KHANPUR, JOTKRISHTAI) Mouza under Jamalpur Block of Burdwan Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000667/2022-2023 382/BWD 31/01/2023 30 KAUSHIK RAY 21.55 21.31 98.89 100
3966 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap connection (FHTC) by retrofitting within the command area of Jot Raghab Piped Water Supply Scheme at Jamalpur Block under Burdwan Division, P.H.E. DTE. , SM/08708 Retrofitting Restoration of concrete road ,construction of valve chamber of JOTRAGHAB Piped Water Supply Scheme and its adjoining mouzas within JAMALPUR block under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000850/2023-2024 2738/BSD 28/11/2023 30 A R TRADERS 0.96 0.00 0 100
3967 PURBA BARDHAMAN Khandaghosh Burdwan Division AMILIA PIPED WATER SUPPLY SCHEME , SM/14963 New Material Requisition To Resource Division RTOR000084/2022-2023 1239/BWD 17/03/2023 Resource Division 5.51 0.00 0 0
3968 PURBA BARDHAMAN Khandaghosh Burdwan Division AMILIA PIPED WATER SUPPLY SCHEME , SM/14963 New Material Requisition To Resource Division RTOR000102/2022-2023 1637/BWD 06/04/2023 Resource Division 1.93 0.00 0 0
3969 PURBA BARDHAMAN Khandaghosh Central Mechanical AMILIA PIPED WATER SUPPLY SCHEME , SM/14963 New New service connection charges of Amilia W/S Scheme TW-1 BILL/00678/2023-2024 BP-2023-24-23 21/06/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.90 0.00 0 0
3970 PURBA BARDHAMAN Khandaghosh Central Mechanical AMILIA PIPED WATER SUPPLY SCHEME , SM/14963 New New service connection charges of Amilia W/S Scheme TW-2 BILL/00679/2023-2024 BP-2023-24-24 21/06/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 2.81 0.00 0 0
3971 PURBA BARDHAMAN Khandaghosh Burdwan Division AMILIA PIPED WATER SUPPLY SCHEME , SM/14963 New Material Requisition To Resource Division RTOR000789/2023-2024 319/BWD 24/01/2024 Resource Division 21.17 0.00 0 0
3972 PURBA BARDHAMAN Khandaghosh Central Mechanical AMILIA PIPED WATER SUPPLY SCHEME , SM/14963 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at Amilia Water Supply Scheme [ Block- Khandoghosh ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER Junior Engineer ORD/000051/2023-2024 2515/CMD 02/06/2023 30 MS MANABESH ROY 28.91 23.03 79.66 90
3973 PURBA BARDHAMAN Khandaghosh Burdwan Division AMILIA PIPED WATER SUPPLY SCHEME , SM/14963 New AMILIA Piped Water Supply Scheme with sinking of Tube-well, LDS, Construction of 150 cum RCC OHR with 20 mtr. staging height including soil testing, Rising Main, FHTC & construction of switch rooms & boundary walls with gates and land development, drain and internal pathway at different TW site under Khandaghosh Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer1, Durgapur Sub-Division, PHE Dte.,Junior Engineer2, Durgapur Sub-Division, PHE Dte. ORD/000737/2022-2023 1067/BWD 13/03/2023 300 SHUBHRA KANTI GHOSH 247.76 148.86 60.08 40
3974 PURBA BARDHAMAN Khandaghosh Central Mechanical AMILIA PIPED WATER SUPPLY SCHEME , SM/14963 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at KHEJURHATI & others water supply scheme under Khandoghosh Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman ASSISTANT ENGINEER Junior Engineer ORD/000071/2024-2025 2391/CMD 02/08/2024 90 C.M. ENTERPRISE 45.81 0.00 0 0
3975 PURBA BARDHAMAN Khandaghosh Burdwan Division AMILIA PIPED WATER SUPPLY SCHEME , SM/14963 New Continuation for the work of Supply of Inspection Vehicle for inspection of different JJM related (Schemes) works as and when required including supply of driver & fuel (minimum 8 Hours duty per day) and all taxes etc. for Durgapur Sub-Division under BurdwanDivision, P.H.E. Dte.consider 96.00 Km. run per day [Period AUG.'2024 to OCT.'2024] ORD/000845/2024-2025 575/DSD 19/07/2024 78 MD HASIN 1.00 0.00 0 0
3976 PURBA BARDHAMAN Khandaghosh Burdwan Division AMILIA PIPED WATER SUPPLY SCHEME , SM/14963 New Way leave / Track crossing proposal with Application ID: SER-ADRA-2024-WL-114 in IR-RBCS laying of 200 mm dia Carrier pipe with 600 mm dia Casing pipe for water supply on (Jal Jeevan Mission) at KM 317/03 to 317/04 in between Seharabazar (SRBZ) to Kaiyar (KYB) by PHE Dte.,Burdwan Division. BILL/01098/2024-2025 1184/JJM 20/12/2024 INDIAN RAILWAY 5.32 0.00 0 0
3977 PURBA BARDHAMAN Khandaghosh Burdwan Division AMILIA PIPED WATER SUPPLY SCHEME , SM/14963 New Survey, planning, design of pipe crossing system by adopting trenchless technologies (e.g. Jack Pushing Method etc.) for crossing Railway, as per relevant I.S. Code with latest amendment, guidelines, specification and requirement of the authorities owning the railway track, submission of design report and drawing obtaining permission on behalf of the PHE Dte. across the railway track between Seharabazar (SRBZ) and Kaiyar (KYB) Station & connecting with existing 160mm dia HDPE distribution main line of AMILIA Water Supply Scheme of Khandaghosh Block under Burdwan Division, P.H.E. Dte. Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/001308/2024-2025 938/BWD 11/03/2025 30 MANASH GHOSH 30.33 0.00 0 0
3978 PURBA BARDHAMAN Mangolkote Burdwan Division BHATPARA PIPE WATER SUPPLY SCHEME , SM/14975 New Material Requisition To Resource Division RTOR000253/2023-2024 2197/BWD 12/05/2023 Resource Division 9.75 0.00 0 0
3979 PURBA BARDHAMAN Mangolkote Burdwan Division BHATPARA PIPE WATER SUPPLY SCHEME , SM/14975 New Material Requisition To Resource Division RTOR000460/2023-2024 3984/BWD 08/09/2023 Resource Division 1.21 0.00 0 0
3980 PURBA BARDHAMAN Mangolkote Burdwan Division BHATPARA PIPE WATER SUPPLY SCHEME , SM/14975 New Material Requisition To Resource Division RTOR000798/2023-2024 311/BWD 24/01/2024 Resource Division 20.47 0.00 0 0
3981 PURBA BARDHAMAN Mangolkote Central Mechanical BHATPARA PIPE WATER SUPPLY SCHEME , SM/14975 New Quotation for new service connection at Bhatpara PWSS PH-2. BILL/00348/2024-2025 BP-2024-25-170 01/07/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.38 0.00 0 0
3982 PURBA BARDHAMAN Mangolkote Central Mechanical BHATPARA PIPE WATER SUPPLY SCHEME , SM/14975 New Quotation for new service connection at Bhatpara PWSS PH-1. BILL/00349/2024-2025 BP-2024-25-171 01/07/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.58 0.00 0 0
3983 PURBA BARDHAMAN Mangolkote Burdwan Division BHATPARA PIPE WATER SUPPLY SCHEME , SM/14975 New Different works related (sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of different capacity RCC OHRs each with 20.0mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site) to BHATPARA & MAHARUTBA Piped Water Supply Scheme under Mangolkote Block, District:-Purba-Bardhaman [NEW SCHEME] Assistant Engineer J.E. katwa,Junior Engineer ORD/000429/2023-2024 3328/BWD 02/08/2023 365 KAMIRUL SK & CO. 815.64 76.68 9.4 10
3984 PURBA BARDHAMAN Mangolkote Central Drilling BHATPARA PIPE WATER SUPPLY SCHEME , SM/14975 New Providing drilling crew and other allied works for construction of Tube Well (250mm X150mm X 240 Mtrs. Depth) by utilizing Departmental Machineries for Bhatpara W/S Scheme (T/W-I & II), Block- Mangolkote under Purba Bardhman District, Central Drilling Division, P.H.E. Dte. Assistant Engineer Junior Engineer ORD/000156/2023-2024 1820/CDD 07/12/2023 268 UTTAM KUMAR CHATTERJEE 23.35 0.00 0 100
3985 PURBA BARDHAMAN Mangolkote Central Mechanical BHATPARA PIPE WATER SUPPLY SCHEME , SM/14975 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Jabagram & others water supply scheme under Mangalkote Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. Driller In-Charge Junior Engineer ORD/000118/2024-2025 2590/CMD 27/08/2024 90 M/S SAJAHAN CHOWDHURY 62.06 0.00 0 0
3986 PURBA BARDHAMAN Mangolkote Burdwan Division BHATPARA PIPE WATER SUPPLY SCHEME , SM/14975 New Material Requisition To Resource Division RTOR000074/2024-2025 400/BWD 17/01/2025 Resource Division 3.70 0.00 0 0
3987 PURBA BARDHAMAN Mangolkote Central Mechanical BHATPARA PIPE WATER SUPPLY SCHEME , SM/14975 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at BHATPARA Water Supply Scheme [ Block- MANGALKOTE] under CMD, PHE Dte., Dist.- Purba-Bardhaman. Driller In-Charge Junior Engineer ORD/000831/2023-2024 4108/CMD 29/08/2023 580 JAL PRAVAHIKA PVT LTD 28.97 0.00 0 42
3988 PURBA BARDHAMAN Raina - I Burdwan Division CHAKPUROHIT PIPED WATER SUPPLY SCHEME , SM/14978 New Material Requisition To Resource Division RTOR000269/2023-2024 2197/BWD 12/05/2023 Resource Division 9.34 0.00 0 0
3989 PURBA BARDHAMAN Raina - I Burdwan Division CHAKPUROHIT PIPED WATER SUPPLY SCHEME , SM/14978 New Material Requisition To Resource Division RTOR000485/2023-2024 4009/BWD 08/09/2023 Resource Division 1.37 0.00 0 0
3990 PURBA BARDHAMAN Raina - I Central Mechanical CHAKPUROHIT PIPED WATER SUPPLY SCHEME , SM/14978 New New service connection charges for Chakpurohit PWSS TW-1 BILL/01527/2023-2024 BP-2023-24-192 11/10/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.90 0.00 0 0
3991 PURBA BARDHAMAN Raina - I Burdwan Division CHAKPUROHIT PIPED WATER SUPPLY SCHEME , SM/14978 New Material Requisition To Resource Division RTOR000661/2023-2024 5102/BWD 23/11/2023 Resource Division 20.46 0.00 0 0
3992 PURBA BARDHAMAN Raina - I Central Mechanical CHAKPUROHIT PIPED WATER SUPPLY SCHEME , SM/14978 New New service connection charges for Chakpurohit PWSS TW-2 BILL/01666/2023-2024 BP-2023-24-221 10/11/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 5.93 0.00 0 0
3993 PURBA BARDHAMAN Raina - I Central Mechanical CHAKPUROHIT PIPED WATER SUPPLY SCHEME , SM/14978 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Bajitpur, Belsar & other water supply scheme under Raina-1 Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000117/2024-2025 2589/CMD 27/08/2024 90 DEY ENTERPRISE 74.58 0.00 0 0
3994 PURBA BARDHAMAN Raina - I Burdwan Division CHAKPUROHIT PIPED WATER SUPPLY SCHEME , SM/14978 New Continuation Work Order for supply of inspection Vehicle for inspection of different JJM related(schemes)works as and when required including supply of driver & fuel(minimum 8 hours duty per day) and all taxes etc. for Burdwan Sub-Division under Burdwan Division,PHE Dte consider 96.00 Km. run per day (Period from 01-05-2024 to 31-07-2024) JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000108/2024-2025 807/BSD 29/04/2024 66 PARVIN BEGAM 0.85 0.00 0 100
3995 PURBA BARDHAMAN Raina - I Burdwan Division CHAKPUROHIT PIPED WATER SUPPLY SCHEME , SM/14978 New CHAK PUROHIT Piped Water Supply Scheme with sinking of Tube-well, LDS, Construction of 150 cum RCC OHR with 20 mtr. staging height including soil testing, Rising Main, FHTC & construction of switch rooms & boundary walls with gates and land development, drain and internal pathway at different TW site under Raina-I Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000197/2023-2024 2702/BWD 08/06/2023 300 M/S PROCHESTA ENTERPRISE 263.18 111.22 42.26 80
3996 PURBA BARDHAMAN Raina - I Burdwan Division CHAKPUROHIT PIPED WATER SUPPLY SCHEME , SM/14978 New Balance work [i.e. Extension or parallel Pipeline, Leftout FHTC, Road Restoration work, Sinking of Additional Tube Well with Pump House & Boundary wall, inter Connection of Additional Tube Well, Construction of M.S.Structural bridge, canal Crossing, MS casing with allied work of Bhagabatipur, Machkhara, Udgara, Bantir, Chakpurohit Rasuikhanda, Sankarpur, Gopalpur & Belshar PWSS Block-RAINA- I under Burdwan Sub Division, PHE Dte. within Burdwan Division PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/001103/2024-2025 469/BWD 24/01/2025 180 SK ALIM 1,353.91 0.00 0 0
3997 PURBA BARDHAMAN Raina - I Central Mechanical CHAKPUROHIT PIPED WATER SUPPLY SCHEME , SM/14978 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at Chak Purohit Water Supply Scheme [ Block- Raina-1 ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000576/2023-2024 3916/CMD 21/08/2023 345 P.K. ENGINEERING 28.90 0.00 0 96
3998 PURBA BARDHAMAN Burdwan Division Augmentation of Ground Water based Piped Water Supply Scheme for GALSI to accommodate FHTC under Jal Sapno Mission underGalsi-II Block in Purba Bardhaman District under Burdwan Division, P.H.E. DTE. , SM/09712 Augmentation Supply of materials for different water supply schemes under Burdwan Division, PHE Dte. VCH/001555/2021-2022 1194/DW 10/03/2022 EXECUTIVE ENGINEER, RESOURCES DIVISION, P.H.E. DTE. 62.76 0.00 0 0
3999 PURBA BARDHAMAN Burdwan Division Augmentation of Ground Water based Piped Water Supply Scheme for GALSI to accommodate FHTC under Jal Sapno Mission underGalsi-II Block in Purba Bardhaman District under Burdwan Division, P.H.E. DTE. , SM/09712 Augmentation Supply of materials for different water supply scheme under Burdwan Division, PHE Dte. VCH/001578/2021-2022 1207/DW 10/03/2022 EXECUTIVE ENGINEER, RESOURCES DIVISION, P.H.E. DTE. 3,005.00 0.00 0 0
4000 PURBA BARDHAMAN Burdwan Division Augmentation of Ground Water based Piped Water Supply Scheme for GALSI to accommodate FHTC under Jal Sapno Mission underGalsi-II Block in Purba Bardhaman District under Burdwan Division, P.H.E. DTE. , SM/09712 Augmentation Route Survey & Preparation of DPR for GALSI PWSS under Durgapur(Bardhaman North) Sub-Division under Burdwan Division PHE Dte.[SL-D] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000655/2021-2022 102/DSD 18/02/2022 15 SIRCON ENGINEERING SERVICES 2.74 2.74 100 1
4001 PURBA BARDHAMAN Burdwan Division Augmentation of Ground Water based Piped Water Supply Scheme for GALSI to accommodate FHTC under Jal Sapno Mission underGalsi-II Block in Purba Bardhaman District under Burdwan Division, P.H.E. DTE. , SM/09712 Augmentation Sinking of 300 X 200mm dia Tube Well 200 mtr. Depth by D.R. Rig method using UPVC pipe (CD) and UPVC Deep Well Screen (RDS) at H.W, 2nd and 3rd Tubewell site for GALSI Piped Water Supply Scheme, Block - Galsi ¿ II, Dist - Purba Bardhaman under Burdwan Division, PHE Dte. [3 Nos. GTW]. Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000641/2021-2022 1622/BWD 21/03/2022 60 AUXILIARY TUBE WELL DRILLERS 35.56 18.65 52.45 1
4002 PURBA BARDHAMAN Burdwan Division Augmentation of Ground Water based Piped Water Supply Scheme for GALSI to accommodate FHTC under Jal Sapno Mission underGalsi-II Block in Purba Bardhaman District under Burdwan Division, P.H.E. DTE. , SM/09712 Augmentation Retrofitting of RCC Elevated Reservoir (Capacity 450 Cum) by Shortcreting, Guniting etc. in connection with Augmentation of Galsi W/S. Scheme under Burdwan Division, PHE. Dte. Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000819/2021-2022 6042/BWD 07/10/2021 45 SUDIPTO GORAIN 10.00 10.00 100 1
4003 PURBA BARDHAMAN Burdwan Division Augmentation of Ground Water based Piped Water Supply Scheme for GALSI to accommodate FHTC under Jal Sapno Mission underGalsi-II Block in Purba Bardhaman District under Burdwan Division, P.H.E. DTE. , SM/09712 Augmentation Quotation for new connection charges for Augmentation of Galsi w/s scheme under Burdwan Division, PHE Dte. T.W. No.-5 [Application No.-5003534483, dt.-28/11/2022, Ref. ID-503226320] BILL/00116/2022-2023 915/DW 30/12/2022 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LTD. 3.67 0.00 0 0
4004 PURBA BARDHAMAN Central Mechanical Augmentation of Ground Water based Piped Water Supply Scheme for GALSI to accommodate FHTC under Jal Sapno Mission underGalsi-II Block in Purba Bardhaman District under Burdwan Division, P.H.E. DTE. , SM/09712 Augmentation Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Augmentation of Galsi Water Supply Scheme [ Block- Galsi-ii ] at pwss-2/3 site, Tube well No.-4 under CMD, PHE Dte., Dist.- Purba-Bardhaman ASSISTANT ENGINEER ORD/000613/2022-2023 2097/CMD 08/09/2022 30 UNIVERSAL ENTERPRISES 11.07 10.79 97.47 1
4005 PURBA BARDHAMAN Burdwan Division Augmentation of Ground Water based Piped Water Supply Scheme for GALSI to accommodate FHTC under Jal Sapno Mission underGalsi-II Block in Purba Bardhaman District under Burdwan Division, P.H.E. DTE. , SM/09712 Augmentation Supply and delivery of different dia. CIDF sluice valve for Augmentation of Dignagar, Galsi, Barabelun & Kotachandipur Piped Water Supply Scheme within Durgapur (Burdwan North) Sub-Division under Burdwan Division, P.H.E. Dte. _2ND CALL Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000311/2022-2023 3624/BWD 22/08/2022 20 SSPR VALVE MANUFACTURING PVT LTD. 14.76 0.00 0 1
4006 PURBA BARDHAMAN Burdwan Division Augmentation of Ground Water based Piped Water Supply Scheme for GALSI to accommodate FHTC under Jal Sapno Mission underGalsi-II Block in Purba Bardhaman District under Burdwan Division, P.H.E. DTE. , SM/09712 Augmentation Dismantling of concrete road in connection of Laying Distribution Network of Ground Water based Piped Water Supply Scheme for Augmentation of GALSI Piped Water Supply Scheme under Galsi-II in Purba Bardhaman District under Burdwan Division, P.H.E. Dte. Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000740/2022-2023 1084/BWD 13/03/2023 30 M/S EL-CON 13.75 13.67 99.42 0
4007 PURBA BARDHAMAN Burdwan Division Augmentation of Ground Water based Piped Water Supply Scheme for GALSI to accommodate FHTC under Jal Sapno Mission underGalsi-II Block in Purba Bardhaman District under Burdwan Division, P.H.E. DTE. , SM/09712 Augmentation Restoration of damages caused by PHE Dte. at Galsi Gohogram Road between 0.00 Km & 1.50 Km. (NH-2 Junction) from laying of underground pipeline under Asansol Highway Division, PW Roads Dte. BILL/00024/2023-2024 24/JJM 18/04/2023 EXECUTIVE ENGINEER, ASANSOL HIGHWAY DIVISION, P.W.(ROADS) DTE. 4.56 0.00 0 0
4008 PURBA BARDHAMAN Central Mechanical Augmentation of Ground Water based Piped Water Supply Scheme for GALSI to accommodate FHTC under Jal Sapno Mission underGalsi-II Block in Purba Bardhaman District under Burdwan Division, P.H.E. DTE. , SM/09712 Augmentation Supply & Installation of Submersible Pumping Machinery , Voltage Stabilizer, Chlorination system and internal House wiring for Tube well no.- 3 (SL no.5) at Augumentation of Galsi Water Supply Scheme under CMD, PHE Dte., Dist.- Purba-Bardhaman. Driller In-Charge JUNIOR ENGINEER ORD/000068/2023-2024 2563/CMD 06/06/2023 30 C.M. ENTERPRISE 10.78 0.00 0 0
4009 PURBA BARDHAMAN Burdwan Division Augmentation of Ground Water based Piped Water Supply Scheme for GALSI to accommodate FHTC under Jal Sapno Mission underGalsi-II Block in Purba Bardhaman District under Burdwan Division, P.H.E. DTE. , SM/09712 Augmentation Construction of Toilet (Female) at Durgapur (Burdwan North) Sub Division premises under Augmentation of Galsi piped water supply scheme under Burdwan Division PHE Dte. [SL-08] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer1, Durgapur Sub-Division, PHE Dte. ORD/000059/2023-2024 183/DSD 18/04/2023 21 ANWESHA CONSTRUCTION 0.91 0.89 97.8 100
4010 PURBA BARDHAMAN Burdwan Division Augmentation of Ground Water based Piped Water Supply Scheme for GALSI to accommodate FHTC under Jal Sapno Mission underGalsi-II Block in Purba Bardhaman District under Burdwan Division, P.H.E. DTE. , SM/09712 Augmentation Material Requisition To Resource Division RTOR000019/2021-2022 7346/BWD 30/12/2021 Resource Division 13.73 0.00 0 0
4011 PURBA BARDHAMAN Burdwan Division Augmentation of Ground Water based Piped Water Supply Scheme for GALSI to accommodate FHTC under Jal Sapno Mission underGalsi-II Block in Purba Bardhaman District under Burdwan Division, P.H.E. DTE. , SM/09712 Augmentation Material Requisition To Resource Division RTOR000027/2021-2022 554/BWD 27/01/2022 Resource Division 23.26 0.00 0 0
4012 PURBA BARDHAMAN Burdwan Division Augmentation of Ground Water based Piped Water Supply Scheme for GALSI to accommodate FHTC under Jal Sapno Mission underGalsi-II Block in Purba Bardhaman District under Burdwan Division, P.H.E. DTE. , SM/09712 Augmentation Material Requisition To Resource Division RTOR000098/2021-2022 772/BWD 07/02/2022 Resource Division 43.86 0.00 0 0
4013 PURBA BARDHAMAN Burdwan Division Augmentation of Ground Water based Piped Water Supply Scheme for GALSI to accommodate FHTC under Jal Sapno Mission underGalsi-II Block in Purba Bardhaman District under Burdwan Division, P.H.E. DTE. , SM/09712 Augmentation Material Requisition To Resource Division RTOR000185/2021-2022 1380/BWD 09/03/2022 Resource Division 3.86 0.00 0 0
4014 PURBA BARDHAMAN Burdwan Division Augmentation of Ground Water based Piped Water Supply Scheme for GALSI to accommodate FHTC under Jal Sapno Mission underGalsi-II Block in Purba Bardhaman District under Burdwan Division, P.H.E. DTE. , SM/09712 Augmentation Material Requisition To Resource Division RTOR000235/2021-2022 1559/BWD 15/03/2022 Resource Division 0.37 0.00 0 0
4015 PURBA BARDHAMAN Burdwan Division Augmentation of Ground Water based Piped Water Supply Scheme for GALSI to accommodate FHTC under Jal Sapno Mission underGalsi-II Block in Purba Bardhaman District under Burdwan Division, P.H.E. DTE. , SM/09712 Augmentation Material Requisition To Resource Division RTOR000167/2021-2022 1327/BWD 08/03/2022 Resource Division 55.09 0.00 0 0
4016 PURBA BARDHAMAN Burdwan Division Augmentation of Ground Water based Piped Water Supply Scheme for GALSI to accommodate FHTC under Jal Sapno Mission underGalsi-II Block in Purba Bardhaman District under Burdwan Division, P.H.E. DTE. , SM/09712 Augmentation Material Requisition To Resource Division RTOR000037/2022-2023 4629/BWD 17/10/2022 Resource Division 12.32 0.00 0 0
4017 PURBA BARDHAMAN Durgapur W/S Division Augmentation of Ground Water based Piped Water Supply Scheme for GALSI to accommodate FHTC under Jal Sapno Mission underGalsi-II Block in Purba Bardhaman District under Burdwan Division, P.H.E. DTE. , SM/09712 Augmentation FORMAL WORK ORDER FOR Additional work for laying of extension or laying of paralled pipeline construction of boundary wall providing left out FHTC road restoration work inter connection of tube well with allied work for Augmentation of Galsi PWSS Galsi-II Block, Dist- Purba Bardhaman under DURGAPUR W/S DIVISION, PHE DTE. Assistant Engineer-II Contractual Junior Engineer_5 ORD/000262/2024-2025 533/DWSD 25/03/2025 90 J D CONSTRUCTION 159.40 0.00 0 0
4018 PURBA BARDHAMAN Durgapur W/S Division Augmentation of Ground Water based Piped Water Supply Scheme for GALSI to accommodate FHTC under Jal Sapno Mission underGalsi-II Block in Purba Bardhaman District under Burdwan Division, P.H.E. DTE. , SM/09712 Augmentation Material Requisition To Resource Division RTOR000049/2024-2025 469/DWSD 17/03/2025 Resource Division 0.21 0.00 0 0
4019 PURBA BARDHAMAN Durgapur W/S Division Augmentation of Ground Water based Piped Water Supply Scheme for GALSI to accommodate FHTC under Jal Sapno Mission underGalsi-II Block in Purba Bardhaman District under Burdwan Division, P.H.E. DTE. , SM/09712 Augmentation FORMAL WORK ORDER FOR Additional work for Laying of Extension or Laying of parallel Pipeline, Sinking of Tube Well (5th. TW], Pump House, Providing Leftout FHTC, Road Restoration work, Inter Connection of Tube Well, with allied work for Augmentation of GALSI Piped Water Supply Scheme , Galsi-II Block ,Dist - Purba Bardhaman under Durgapur Water Supply Division, PHE Dte. Assistant Engineer-I,Assistant Engineer-II Contractual Junior Engineer_5,Junior Engineer_3 ORD/000289/2024-2025 584/DWSD 26/03/2025 90 GHOSH CONSTRUCTION 107.93 0.00 0 0
4020 PURBA BARDHAMAN Burdwan Division Augmentation of Ground Water based Piped Water Supply Scheme for GALSI to accommodate FHTC under Jal Sapno Mission underGalsi-II Block in Purba Bardhaman District under Burdwan Division, P.H.E. DTE. , SM/09712 Augmentation Augmentation of GALSI Water Supply Scheme with LDS, Rising Main, FHTC Work, Pump House & Boundary Wall of Galsi - II Block in Durgapur (Burdwan North) Sub-Division, District - Purba Bardhaman under Burdwan Division, PHE. Dte. Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000385/2021-2022 257/BWD 13/01/2022 725 M/S EL-CON 425.49 81.56 19.17 40
4021 PURBA BARDHAMAN Purbasthali - I Burdwan Division SHYAMPUR PIPE WATER SUPPLY SCHEME , SM/15585 New Material Requisition To Resource Division RTOR000320/2023-2024 2197/BWD 12/05/2023 Resource Division 14.98 0.00 0 0
4022 PURBA BARDHAMAN Purbasthali - I Burdwan Division SHYAMPUR PIPE WATER SUPPLY SCHEME , SM/15585 New Material Requisition To Resource Division RTOR000547/2023-2024 4300/BWD 29/09/2023 Resource Division 0.58 0.00 0 0
4023 PURBA BARDHAMAN Purbasthali - I Burdwan Division SHYAMPUR PIPE WATER SUPPLY SCHEME , SM/15585 New Material Requisition To Resource Division RTOR000589/2023-2024 4946/BWD 10/11/2023 Resource Division 9.76 0.00 0 0
4024 PURBA BARDHAMAN Purbasthali - I Burdwan Division SHYAMPUR PIPE WATER SUPPLY SCHEME , SM/15585 New Different works related (sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of different capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site) to SHYAMPUR, GAHAK & SHANKRA Piped Water Supply Scheme under Purbasthali I Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000639/2023-2024 3957/BWD 07/09/2023 365 M/S B. NANDI 758.52 0.00 0 20
4025 PURBA BARDHAMAN Purbasthali - I Central Mechanical SHYAMPUR PIPE WATER SUPPLY SCHEME , SM/15585 New Quotation for new service connection at Shyampur PWSS PH-2. BILL/00458/2024-2025 BP-2024-25-250 01/08/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 8.61 0.00 0 0
4026 PURBA BARDHAMAN Purbasthali - I Burdwan Division SHYAMPUR PIPE WATER SUPPLY SCHEME , SM/15585 New CONSTRUCTION OF TEMPORARY KIOSK FOR THE NECESSARY ARRANGEMENT OF ELECTRIFICATION OF TUBEWELL FOR SHYAMPUR PWSS UNDER KALNA SUB-DIVISION UNDER BURDWAN DIVISION, PHE DTE. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000570/2024-2025 1016/KSD 07/08/2024 15 DEL DELTA CONSTRUCTION 0.66 0.00 0 100
4027 PURBA BARDHAMAN Purbasthali - I Central Mechanical SHYAMPUR PIPE WATER SUPPLY SCHEME , SM/15585 New Quotation for new service connection at Shyampur PWSS PH 1. BILL/00934/2024-2025 BP-2024-25-352 05/10/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 6.57 0.00 0 0
4028 PURBA BARDHAMAN Purbasthali - I Central Mechanical SHYAMPUR PIPE WATER SUPPLY SCHEME , SM/15585 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Manganpur & others water supply scheme under Purbasthali 1 Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000714/2024-2025 2979/CMD 25/11/2024 90 H.K. DAS & CO. 53.27 0.00 0 0
4029 PURBA BARDHAMAN Purbasthali - I Central Mechanical SHYAMPUR PIPE WATER SUPPLY SCHEME , SM/15585 New Supply & Installation of Submersible Pumping Machinery , Voltage Stabilizer, Chlorination system and internal House wiring for Tube well no.- 1 & 2 at SHYAMPUR [PURBASTHALI-I] Water Supply Scheme under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000888/2023-2024 4151/CMD 29/08/2023 581 DUTTA ENTERPRISE 20.80 0.00 0 100
4030 PURBA BARDHAMAN Burdwan Division Providing Functional House hold Tap Connection (FHTC) by retrofitting at Akhina , Baje Kowarpur, Binodpur, Dakshin Gopalpur, Dakshin Mohanpur and Pahalanpur mouzas within the command area of Chhotobainan piped Water Supply Scheme at Raina-II Block under B , SM/08699 Retrofitting Supply of materials for different water supply scheme under Burdwan Division, PHE Dte. VCH/001013/2021-2022 null 21/01/2022 EXECUTIVE ENGINEER, RESOURCES DIVISION, P.H.E. DTE. 617.98 0.00 0 0
4031 PURBA BARDHAMAN Burdwan Division Providing Functional House hold Tap Connection (FHTC) by retrofitting at Akhina , Baje Kowarpur, Binodpur, Dakshin Gopalpur, Dakshin Mohanpur and Pahalanpur mouzas within the command area of Chhotobainan piped Water Supply Scheme at Raina-II Block under B , SM/08699 Retrofitting Extension of pipeline for Chhotobainan water supply scheme at Pahalanpur and Rupsara village within Raina-II Block under Burdwan Division, PHE Dte.[Gr.-C] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000418/2021-2022 1119/BSD 24/08/2021 45 BOSE ENTERPRISE 4.67 2.43 52.03 1
4032 PURBA BARDHAMAN Burdwan Division Providing Functional House hold Tap Connection (FHTC) by retrofitting at Akhina , Baje Kowarpur, Binodpur, Dakshin Gopalpur, Dakshin Mohanpur and Pahalanpur mouzas within the command area of Chhotobainan piped Water Supply Scheme at Raina-II Block under B , SM/08699 Retrofitting Payment for supply of materials for different water supply scheme under Burdwan Division, PHE Dte. VCH/001045/2021-2022 934/DW 31/01/2022 EXECUTIVE ENGINEER, RESOURCES DIVISION, P.H.E. DTE. 617.98 0.00 0 0
4033 PURBA BARDHAMAN Burdwan Division Providing Functional House hold Tap Connection (FHTC) by retrofitting at Akhina , Baje Kowarpur, Binodpur, Dakshin Gopalpur, Dakshin Mohanpur and Pahalanpur mouzas within the command area of Chhotobainan piped Water Supply Scheme at Raina-II Block under B , SM/08699 Retrofitting Quotation of new connection charges of Chhotobainan water supply scheme under Burdwan Division, PHE Dte. [Application No.-5003481960, Ref ID-503178571], VCH/000593/2022-2023 709/DW/22-23 21/10/2022 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LTD. 3.37 0.00 0 0
4034 PURBA BARDHAMAN Burdwan Division Providing Functional House hold Tap Connection (FHTC) by retrofitting at Akhina , Baje Kowarpur, Binodpur, Dakshin Gopalpur, Dakshin Mohanpur and Pahalanpur mouzas within the command area of Chhotobainan piped Water Supply Scheme at Raina-II Block under B , SM/08699 Retrofitting Construction of Pump House cum chlorine room without sanitary and water supply arrangement at 3rd Tube Well Site (Baje Kumarpur) to departmental drawing no-PHE/BD/P.H/DRG/02/DEC-17(Size 3.60 mtr x 3.00 mtr room) for Chhotobainan its Adjoining Mouza W/S Scheme, block -Raina-II within Burdwan Sub-Division, PHE Dte. Gr.B. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000469/2022-2023 1526/BSD 05/09/2022 60 BRINDABAN KONAR 3.03 2.60 85.81 1
4035 PURBA BARDHAMAN Burdwan Division Providing Functional House hold Tap Connection (FHTC) by retrofitting at Akhina , Baje Kowarpur, Binodpur, Dakshin Gopalpur, Dakshin Mohanpur and Pahalanpur mouzas within the command area of Chhotobainan piped Water Supply Scheme at Raina-II Block under B , SM/08699 Retrofitting Providing leftout water tap connection in different villages for 100% coverage to make it Sajal Gram from existing distribution system within scheme jurisdiction of different Piped Water Supply Schemes within Raina ¿ II Block under Burdwan Division, PHE. Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000390/2021-2022 269/BWD 14/01/2022 30 PRONAB KUMAR DEY 6.99 0.00 0 1
4036 PURBA BARDHAMAN Burdwan Division Providing Functional House hold Tap Connection (FHTC) by retrofitting at Akhina , Baje Kowarpur, Binodpur, Dakshin Gopalpur, Dakshin Mohanpur and Pahalanpur mouzas within the command area of Chhotobainan piped Water Supply Scheme at Raina-II Block under B , SM/08699 Retrofitting Sinking of additional 250 X 200mm dia Tube Well 150 mtr. Depth by D.R. Rig method using UPVC pipe (CD) and UPVC Deep Well Screen (RDS) for CHHOTOBAINAN Piped Water Supply Scheme, Block - Raina - II, Dist - Purba Bardhaman under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000055/2022-2023 2233/BWD 29/04/2022 30 J. K. CORPORATION 10.76 9.72 90.33 1
4037 PURBA BARDHAMAN Burdwan Division Providing Functional House hold Tap Connection (FHTC) by retrofitting at Akhina , Baje Kowarpur, Binodpur, Dakshin Gopalpur, Dakshin Mohanpur and Pahalanpur mouzas within the command area of Chhotobainan piped Water Supply Scheme at Raina-II Block under B , SM/08699 Retrofitting Extension of pipeline with FHTC for CHHOTOBAINAN Piped Water Supply Scheme (Akina (P), Pahalanpur, Dakshin Gopalpur, Bajekumarpur, Binodpur, Momrejpur village) within Raina II Block under Burdwan Division, PHE. Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000032/2022-2023 2163/BWD 26/04/2022 45 BRINDABAN KONAR 71.69 56.07 78.21 1
4038 PURBA BARDHAMAN Burdwan Division Providing Functional House hold Tap Connection (FHTC) by retrofitting at Akhina , Baje Kowarpur, Binodpur, Dakshin Gopalpur, Dakshin Mohanpur and Pahalanpur mouzas within the command area of Chhotobainan piped Water Supply Scheme at Raina-II Block under B , SM/08699 Retrofitting Material Requisition To Resource Division RTOR000022/2021-2022 424/BWD 20/01/2022 Resource Division 5.50 0.00 0 0
4039 PURBA BARDHAMAN Burdwan Division Providing Functional House hold Tap Connection (FHTC) by retrofitting at Akhina , Baje Kowarpur, Binodpur, Dakshin Gopalpur, Dakshin Mohanpur and Pahalanpur mouzas within the command area of Chhotobainan piped Water Supply Scheme at Raina-II Block under B , SM/08699 Retrofitting Conducting physical Household Survey at the IMIS reported village for HGJ certification and providing balance FHTC for Har Ghar Jal certification including conducting Gram Sabhas for different IMIS reported villages across the district under Burdwan Division, PHE Dte. AE(HQs),Assistant Engineer ,Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE.,Assistant Engineer, Durgapur Sub Division, P.H.E. Dte JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000428/2024-2025 3107/BWD 12/08/2024 90 TUBGRAM GRAMMYAK UNNAYAN SAMITY 309.60 0.00 0 50
4040 PURBA BARDHAMAN Khandaghosh Burdwan Division PROCUREMENT OF LAND OF TARAPOSH PIPED WATER SUPPLY SCHME KHANDAGHOSH BLOCK, DIST.- PURBA BARDHAMAN VIDE G O NO PHE/2793/IL-26/18 DATED 25/11/2021 OF THE DEPUTY SECRETARY TECHNICAL TO THE GOVERNMENT OF WEST BENGAL , SM/14185 New PROCUREMENT OF LAND OF TARAPOSH PIPED WATER SUPPLY SCHME KHANDAGHOSH BLOCK, DIST.- PURBA BARDHAMAN VIDE G O NO PHE/2793/IL-26/18 DATED 25/11/2021 OF THE DEPUTY SECRETARY TECHNICAL TO THE GOVERNMENT OF WEST BENGAL BILL/00427/2024-2025 1027/LAND 25/10/2024 PURBA BARDHAMAN ZILLA PARISHAD 15.88 0.00 0 0
4041 PURBA BARDHAMAN Central Mechanical AUGMENTATION OF RAYAN (PART-II) PWSS , SM/16486 Augmentation Supply & Installation of Submersible Pumping Machinery , Voltage Stabilizer, Chlorination system and internal House wiring for Tube well no.- 1&2 at Augumentation of Rayan Part - 2 Water Supply Scheme under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER Junior Engineer ORD/000091/2023-2024 2595/CMD 07/06/2023 30 P.K. ENGINEERING 24.20 0.00 0 0
4042 PURBA BARDHAMAN Central Mechanical AUGMENTATION OF RAYAN (PART-II) PWSS , SM/16486 Augmentation New service connection charges for Aug. Rayan PWSS TW-1 BILL/01424/2023-2024 BP-2023-24-151 05/09/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 5.11 0.00 0 0
4043 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF RAYAN (PART-II) PWSS , SM/16486 Augmentation Augmentation of RAYAN (PART-II) Piped Water Supply Scheme with sinking of Tube-well, LDS, Rising Main, FHTC, Construction of 500 cum capacity RCC OHR with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drain and internal pathway at different TW site under Burdwan -I Block, District:- Purba-Bardhaman. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000183/2024-2025 2377/BWD 25/06/2024 270 MATRI ENTERPRISE 697.52 0.00 0 0
4044 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF RAYAN (PART-II) PWSS , SM/16486 Augmentation Material Requisition To Resource Division RTOR000002/2024-2025 4101/BWD 25/11/2024 Resource Division 9.24 0.00 0 0
4045 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF RAYAN (PART-II) PWSS , SM/16486 Augmentation Route Survey & Preparation of DPR for RAYAN -PART-II W/S Scheme under Burdwan-I Block under Burdwan Sub-Division under Burdwan Division PHE Dte. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000848/2024-2025 2585/BSD 26/11/2024 45 APEX ENGINEERING 2.95 0.00 0 0
4046 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF AGRADWIP KASHIPUR PIPED WATER SUPPLY SCHEME , SM/15152 Augmentation Sinking of 300 X 200mm dia Tube Well 200 mtr. Depth by D.R. Rig method using UPVC pipe (CM) and UPVC Medium Well Screen (RMS) for Augmentation of AGRADWIP and its adjoining mouzas Piped Water Supply Scheme, Block Katwa II, Dist - Purba Bardhaman under Burdwan Division, PHE Dte. Assistant Engineer JUNIOR ENGINEER KATWA SUB-DIVISION PHE DTE ORD/000698/2022-2023 604/BWD 17/02/2023 30 AUXILIARY TUBE WELL DRILLERS 12.77 0.00 0 100
4047 PURBA BARDHAMAN Central Mechanical AUGMENTATION OF AGRADWIP KASHIPUR PIPED WATER SUPPLY SCHEME , SM/15152 Augmentation NEW SERVICE CONNECTION FOR AGRADIP KASHIPUR PWSS PH 1 BILL/02954/2023-2024 BP-2023-24-637 15/03/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 6.92 0.00 0 0
4048 PURBA BARDHAMAN Central Mechanical AUGMENTATION OF AGRADWIP KASHIPUR PIPED WATER SUPPLY SCHEME , SM/15152 Augmentation Supply & Installation of Submersible Pumping Machinery , Voltage Stabilizer, Chlorination system and internal House wiring for Tube well no.- 1 at Augumentation of Agradip Kashipur Water Supply Scheme under CMD, PHE Dte., Dist.- Purba-Bardhaman. Driller In-Charge Junior Engineer ORD/000079/2023-2024 2579/CMD 07/06/2023 486 MITRA ENTERPRISE 10.99 0.00 0 100
4049 PURBA BARDHAMAN Central Mechanical AUGMENTATION OF AGRADWIP KASHIPUR PIPED WATER SUPPLY SCHEME , SM/15152 Augmentation Installation of deptt.supplied Pump·motor set and other allied works at PH-1 of Aug. of Agradip Kashipur water supply scheme under CMD, PHE Dte., Dist.- Purba-Bardhaman. Driller In-Charge JUNIOR ENGINEER ORD/000486/2024-2025 513/DIC/BMSD(D) 20/08/2024 7 MITRA ENTERPRISE 0.33 0.00 0 100
4050 PURBA BARDHAMAN Central Mechanical AUGMENTATION OF AGRADWIP KASHIPUR PIPED WATER SUPPLY SCHEME , SM/15152 Augmentation Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.- 2 at Augumentation of Agradip Kashipur (Babladanga) Water Supply Scheme [BLOCK- Katwa-II ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. Driller In-Charge Junior Engineer ORD/000544/2024-2025 2445/CMD 07/08/2024 300 SUBRATA BHADRA 11.63 0.00 0 91
4051 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF AGRADWIP KASHIPUR PIPED WATER SUPPLY SCHEME , SM/15152 Augmentation Construction of Pump House, Boundary walls and Raising Main for Aug. of AGRADWIP Piped W/S. Scheme under Katwa-II Block, District:- Purba-Bardhaman. Assistant Engineer JUNIOR ENGINEER KATWA SUB-DIVISION PHE DTE ORD/000925/2023-2024 5485/BWD 13/12/2023 391 JAMALUDDIN SK 9.75 0.00 0 80
4052 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF AGRADWIP KASHIPUR PIPED WATER SUPPLY SCHEME , SM/15152 Augmentation Augmentation of AGRADWIP Piped Water Supply Scheme with sinking of Tube-well, LDS, Rising Main, FHTC, Construction of 350 cum capacity RCC OHR with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drain and internal pathway at different TW site under KATWA-II Block, District:- Purba-Bardhaman._2ND CALL Assistant Engineer JUNIOR ENGINEER KATWA SUB-DIVISION PHE DTE ORD/000558/2023-2024 3778/BWD 29/08/2023 365 MOTHER INFRASTRUCTURE 420.60 0.00 0 5
4053 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF AGRADWIP KASHIPUR PIPED WATER SUPPLY SCHEME , SM/15152 Augmentation Construction of Pump House cum switch room (5.40 m x 3.60 m) with sanitary arrangement [As per Drawing No. : PHE/SE/CC/PH/DWG-01/2022-23] for additional TW. No - I (Babladanga) under AGRADWIP PWSS (SM/15152) of Katwa-II Block under Katwa Sub-Division PHE Dte. Assistant Engineer ORD/000014/2025-2026 1229/BWD 22/04/2025 60 JAMALUDDIN SK 6.79 0.00 0 0
4054 PURBA BARDHAMAN Burdwan Division AUGUMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR RAMKRISHNAPUR , SM/15187 Augmentation Construction of 3.60 mtr x 3.0 mtr size Pump House cum chlorine room with sanitary and water supply arrangement at to departmental drawing for RAMKRISHNAPUR Water Supply Scheme within Burdwan Division, PHE Dte. Dist.-Purba Bardhaman. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000805/2023-2024 4821/BWD 08/11/2023 60 SK BADIUZZAMAL 4.32 0.00 0 0
4055 PURBA BARDHAMAN Burdwan Division AUGUMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR RAMKRISHNAPUR , SM/15187 Augmentation Designing, Making and Erection of Sign Board for SAJAL GRAM in Khemta Village, Raina - I Block within Ramkrishnapur PWSS under Burdwan Division, PHE Dte. (5 Nos Board) AE(HQs) J.E. 1 BURDWAN ORD/000798/2023-2024 877/AE/HQ 07/11/2023 30 PAPRI HAZRA 0.76 0.00 0 100
4056 PURBA BARDHAMAN Central Mechanical AUGUMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR RAMKRISHNAPUR , SM/15187 Augmentation NEW SERVICE CONNECTION FOR RAMKRISHNAPUR (AUGMENTATION) PWSS TW 03 BILL/00119/2024-2025 BP-2024-25-57 26/04/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.52 0.00 0 0
4057 PURBA BARDHAMAN Burdwan Division AUGUMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR RAMKRISHNAPUR , SM/15187 Augmentation Extension Pipeline with Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of RAMKRISHNAPUR Piped Water Supply Scheme within Raina I Block of Burdwan Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000015/2023-2024 1730/BWD 13/04/2023 60 SUPRIYA RAY 40.13 0.00 0 45
4058 PURBA BARDHAMAN Burdwan Division AUGUMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR RAMKRISHNAPUR , SM/15187 Augmentation Preparation and Submission of DPR for Augmentation of Ramkrishnapur PWSS under Raina-I Development Block under Burdwan Division, P.H.E Dte (2nd Call) Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/001224/2023-2024 2972/BSD 20/12/2023 15 GEO-SOLUTION 0.78 0.00 0 100
4059 PURBA BARDHAMAN Burdwan Division AUGUMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR RAMKRISHNAPUR , SM/15187 Augmentation Laying Parallel Pipeline to improve drinking water supply, Construction Path Way, Drain at different TW Site and providing leftout FHTC, Road Restoration with allied work for RAMKRISHNAPUR Piped Water Supply Scheme, Block- Raina-I, within Burdwan Sub Division under Burdwan Division PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000358/2024-2025 2913/BWD 25/07/2024 120 T.K. BANERJEE & CO. 26.89 0.00 0 0
4060 PURBA BARDHAMAN Burdwan Division AUGUMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR RAMKRISHNAPUR , SM/15187 Augmentation Construction of switch rooms & Rising main at different TW site for RAMKRISHNAPUR Piped Water Supply Scheme under Raina - I Block, District:- Purba-Bardhaman under Burdwan Division, PHE. Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000664/2023-2024 4163/BWD 20/09/2023 60 LAKSHMIKANTA DAS 8.93 5.73 64.17 81
4061 PURBA BARDHAMAN Burdwan Division AUGUMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR RAMKRISHNAPUR , SM/15187 Augmentation Conducting physical Household Survey at the IMIS reported village for HGJ certification and providing balance FHTC for Har Ghar Jal certification including conducting Gram Sabhas for different IMIS reported villages across the district under Burdwan Division, PHE Dte. AE(HQs),Assistant Engineer ,Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE.,Assistant Engineer, Durgapur Sub Division, P.H.E. Dte JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000428/2024-2025 3107/BWD 12/08/2024 90 TUBGRAM GRAMMYAK UNNAYAN SAMITY 309.60 0.00 0 50
4062 PURBA BARDHAMAN Burdwan Division AUGUMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR RAMKRISHNAPUR , SM/15187 Augmentation Sinking of 300 X 200mm dia Tube Well 150 mtr. Depth by D.R. Rig method using UPVC pipe (CD) and UPVC Deep Well Screen (RDS) for 4TH TW site of RAMKRISHNAPUR W/S Scheme under Raina - I Block within Burdwan Sub-Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000205/2023-2024 2708/BWD 08/06/2023 30 M/S D. PALIT & CO. 13.25 0.00 0 100
4063 PURBA BARDHAMAN Central Mechanical AUGUMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR RAMKRISHNAPUR , SM/15187 Augmentation Supply & Installation of Submersible Pumping Machinery , Voltage Stabilizer, Chlorination system and internal House wiring for Tube well no.- 1 at Ramkrishnapur Water Supply Scheme under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000099/2023-2024 2599/CMD 07/06/2023 680 SOUVIK HALDER 10.42 9.83 94.34 90
4064 PURBA BARDHAMAN Central Mechanical AUGMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR CHHOTOBAINAN , SM/15194 Augmentation Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 at Augmentation of Chhotoboinan Water Supply Scheme [ Block- Raina-II ] ( Tube Well no 4 ) under CMD, PHE Dte., Dist.- Purba-Bardhaman ORD/000618/2022-2023 3142/CMD 29/11/2022 30 CHATTERJEE ENTERPRISE 10.99 10.60 96.45 0
4065 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR CHHOTOBAINAN , SM/15194 Augmentation Laying of Interconnection of 3rd Tube well Site of Chotobainan Piped Water Supply Scheme within Burdwan Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000090/2023-2024 737/BSD 20/04/2023 15 BRINDABAN KONAR 0.93 0.90 96.77 100
4066 PURBA BARDHAMAN Central Mechanical AUGMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR CHHOTOBAINAN , SM/15194 Augmentation Providing Electrical accessories for Tube well No. 2 of Chotobainan & others Water Supply Scheme under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000991/2023-2024 4347/CMD 19/09/2023 30 DUTTA ENTERPRISE 3.09 1.55 50.16 100
4067 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR CHHOTOBAINAN , SM/15194 Augmentation Sinking of 300 X 200mm dia Tube Well 150 mtr. Depth by D.R. Rig method using UPVC pipe (CD) and UPVC Deep Well Screen (RDS) for Aug. of CHHOTOBAINAN (NILEDIGHIR PAR) W/S Scheme under Raina-II Block within Burdwan Sub-Division, PHE Dte. [For 01 No. Tube well]. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000595/2023-2024 3768/BWD 29/08/2023 30 B.S. ENTERPRISE 13.13 5.26 40.06 100
4068 PURBA BARDHAMAN Central Mechanical AUGMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR CHHOTOBAINAN , SM/15194 Augmentation New service connection for Augmentation of Chotoboinan PWSS TW-4. BILL/02281/2023-2024 BP-2023-24-435 29/01/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 2.66 0.00 0 0
4069 PURBA BARDHAMAN Central Mechanical AUGMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR CHHOTOBAINAN , SM/15194 Augmentation Procurement of electro-mechanical accessories for Chotoboinan Water Supply Scheme under JJM under CMD, PHE Dte. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/001017/2023-2024 529/CMSD 07/07/2023 30 JOYGURU ENTERPRISE 0.84 0.00 0 99
4070 PURBA BARDHAMAN Central Mechanical AUGMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR CHHOTOBAINAN , SM/15194 Augmentation Supply & Installation of Submersible Pumping Machinery , Voltage Stabilizer, Chlorination system and internal House wiring for Tube well no.- 1&2 at Augumentation of Chotoboinan Water Supply Scheme under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000083/2023-2024 2590/CMD 07/06/2023 30 CHOUDHURY ENTERPRISE 22.51 0.00 0 48
4071 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR CHHOTOBAINAN , SM/15194 Augmentation Construction of Switch room cum chlorine room with sanitary and water supply arrangement (P.H-4) at New Tube Well Site of CHOTOBAINAN and its adjoining Mouzas Pipe Water Supply Scheme of cracky nature of soil according to departmental drawing no.-PHE/BD/P.H/DRG-01/DCE-2017, Block:- Raina-II, under Burdwan Sub-Division, P.H.E Dte. within Burdwan Division P.H.E. Dte. Dist:Purba Bardhaman. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000972/2023-2024 001/BWD 02/01/2024 60 CHOWDHURY CONSTRUCTION 5.83 0.00 0 99
4072 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR CHHOTOBAINAN , SM/15194 Augmentation Preparation and Submission of DPR for Augmentation of Chhotobainan PWSS under Raina-II Development Block under Burdwan Division, P.H.E Dte (2nd Call) Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/001226/2023-2024 2974/BSD 20/12/2023 15 MEASURE LAND 0.78 0.00 0 100
4073 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR CHHOTOBAINAN , SM/15194 Augmentation Improvement/ Strenthenning of RCC Elevated Reservoir (Capacity 700 Cum) & pipe line of CHOTOBAINAN PWSS for smooth running of FHTC work under RAINA-II Block, District:- Purba- Bardhaman. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000295/2024-2025 1277/BSD 12/07/2024 60 ANWESHA CONSTRUCTION 3.34 0.00 0 100
4074 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR CHHOTOBAINAN , SM/15194 Augmentation Conducting physical Household Survey at the IMIS reported village for HGJ certification and providing balance FHTC for Har Ghar Jal certification including conducting Gram Sabhas for different IMIS reported villages across the district under Burdwan Division, PHE Dte. AE(HQs),Assistant Engineer ,Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE.,Assistant Engineer, Durgapur Sub Division, P.H.E. Dte JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000428/2024-2025 3107/BWD 12/08/2024 90 TUBGRAM GRAMMYAK UNNAYAN SAMITY 309.60 0.00 0 50
4075 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR CHHOTOBAINAN , SM/15194 Augmentation Pipeline with FHTC for CHOTOBAINAN Water Supply Scheme at Gopalpur village (400 Nos), Akhina village (250 Nos) within Raina-II Block, under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000795/2022-2023 1498/BWD 28/03/2023 614 BRINDABAN KONAR 59.24 36.43 61.5 100
4076 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR CHHOTOBAINAN , SM/15194 Augmentation Balance Work for extension of pipe lines to provide FHTC With Sinking of Tubwell (Replacement TW), Repairing of pump house with Boundary wall at head worksite & other related works for CHOTOBAINAN PWSS under Burdwan Sub-Div., Block -Raina-II, under Burdwan Division PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/001099/2024-2025 435/BWD 20/01/2025 120 INDIAN ENGINEERS CO.-OPERATIVE SOCIETY LTD. 106.18 0.00 0 0
4077 PURBA BARDHAMAN Ketugram - I Burdwan Division CHINISPUR PIPED WATER SUPPLY SCHEME , SM/15170 New Material Requisition To Resource Division RTOR000097/2023-2024 1962/BWD 25/04/2023 Resource Division 2.34 0.00 0 0
4078 PURBA BARDHAMAN Ketugram - I Burdwan Division CHINISPUR PIPED WATER SUPPLY SCHEME , SM/15170 New Material Requisition To Resource Division RTOR000235/2023-2024 2197/BWD 12/05/2023 Resource Division 20.24 0.00 0 0
4079 PURBA BARDHAMAN Ketugram - I Burdwan Division CHINISPUR PIPED WATER SUPPLY SCHEME , SM/15170 New Material Requisition To Resource Division RTOR000747/2023-2024 5255/BWD 30/11/2023 Resource Division 20.18 0.00 0 0
4080 PURBA BARDHAMAN Ketugram - I Central Drilling CHINISPUR PIPED WATER SUPPLY SCHEME , SM/15170 New Providing drilling crew and other allied works for construction of Tube Well (250mm X200mm X 114 Mtrs. Depth) by utilising Departmental Machineries for Chinispur W/S Scheme (T/W-I & II) , Ketugram-I Block under PurbaBardhman District, Central Drilling Division, P.H.E. Dte. Driller In Charge Junior Engineer ORD/000162/2023-2024 1054 16/08/2023 30 OSMAN SEKH 16.61 0.00 0 0
4081 PURBA BARDHAMAN Ketugram - I Central Mechanical CHINISPUR PIPED WATER SUPPLY SCHEME , SM/15170 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Rajur & others water supply scheme under Ketugram-I Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. Driller In-Charge Junior Engineer ORD/000098/2024-2025 2407/CMD 02/08/2024 90 M.S. ENTERPRISE 82.29 0.00 0 0
4082 PURBA BARDHAMAN Ketugram - I Burdwan Division CHINISPUR PIPED WATER SUPPLY SCHEME , SM/15170 New Different works related (sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of different capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site) to AMEGERIA, ARGUN, CHINISPUR & KULUTIA Piped Water Supply Scheme under KETUGRAM -I Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer JUNIOR ENGINEER R.W.S. BURDWAN SUB-DIVISION PHE DTE ORD/000533/2023-2024 3630/BWD 21/08/2023 365 M/S GOUTAM DAS 1,421.70 0.00 0 75
4083 PURBA BARDHAMAN Ketugram - I Central Mechanical CHINISPUR PIPED WATER SUPPLY SCHEME , SM/15170 New Quotation for new service connection Chinispur PWSS TW No. 1. BILL/00780/2024-2025 BP-2024-25-295 13/09/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 4.07 0.00 0 0
4084 PURBA BARDHAMAN Ketugram - I Central Mechanical CHINISPUR PIPED WATER SUPPLY SCHEME , SM/15170 New Quotation for new service connection CHINISPUR PWSS TW No. 2. BILL/00777/2024-2025 BP-2024-25-296 13/09/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.51 0.00 0 0
4085 PURBA BARDHAMAN Ketugram - I Central Mechanical CHINISPUR PIPED WATER SUPPLY SCHEME , SM/15170 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at CHINISPUR Water Supply Scheme [ Block- KETUGRAM-1] under CMD, PHE Dte., Dist.- Purba-Bardhaman. Driller In-Charge Junior Engineer ORD/000868/2023-2024 4116/CMD 29/08/2023 640 M/S, S.S. ENTERPRISE. 28.48 0.00 0 88
4086 PURBA BARDHAMAN Ketugram - I Burdwan Division CHINISPUR PIPED WATER SUPPLY SCHEME , SM/15170 New Road crossing through metal / concrete road by Jack Push Method for AMEGERIA (SM/16023), ARGUN (SM/16482), CHINISPUR (SM/15170) and KULITIA (SM/15167) PWSS under Ketugram I Development Block under Katwa Sub Division within Burdwan Division, PHE. Dte. Assistant Engineer ORD/001311/2024-2025 977/BWD 13/03/2025 60 M/S GOUTAM DAS 39.22 0.00 0 0
4087 PURBA BARDHAMAN Ketugram - I Burdwan Division CHINISPUR PIPED WATER SUPPLY SCHEME , SM/15170 New Hiring of one no Diesel Motor Cab (BS-VI) including the cost of fuel . mobile & other charges for the inspection of the different projects of JJM for the office of the Assistant Engineer, Katwa Sub-Division, PHE Dte. (Period:- 01/03/2025 to 31/08/2025) [Sl No-02] ORD/001324/2024-2025 321/KTS 28/02/2025 180 HAMID SK 1.84 0.00 0 0
4088 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR LOHAI , SM/15565 Augmentation Construction of Boundary wall at Head Works Site of LOHAI Water Supply scheme under RAINA-II Block of Burdwan Division, PHE Dte. (Length -190.00 Mtr, Col-60 Nos). Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000078/2023-2024 2053/BWD 04/05/2023 60 S. MITRA & CO. 20.43 0.00 0 0
4089 PURBA BARDHAMAN Central Mechanical AUGMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR LOHAI , SM/15565 Augmentation Supply & Installation of Submersible Pumping Machinery , Voltage Stabilizer, Chlorination system and internal House wiring for Tube well no.- 1 at Augumentation of Lohai Water Supply Scheme under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000086/2023-2024 2592/CMD 07/06/2023 30 SOUVIK HALDER 11.36 0.00 0 0
4090 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR LOHAI , SM/15565 Augmentation Extension Pipeline with Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of LOHAI Piped Water Supply Scheme within Raina II Block of Burdwan Sub-Division under Burdwan Division, PHE Dte._2ND CALL Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000149/2023-2024 2422/BWD 30/05/2023 30 JAI MAA DURGA & CO. 19.37 0.00 0 50
4091 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR LOHAI , SM/15565 Augmentation Preparation and Submission of DPR for Augmentation of Lohai PWSS under Raina-II Development Block under Burdwan Division, P.H.E Dte (2nd Call) Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/001225/2023-2024 2973/BSD 20/12/2023 15 MEASURE LAND 0.78 0.00 0 100
4092 PURBA BARDHAMAN Central Mechanical AUGMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR LOHAI , SM/15565 Augmentation Making illumination arrangement and mise works at LOHAI water supply scheme RAINA-II BLOCK under Central Mechanical Division P.H.E. Dte. Purba-Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000471/2024-2025 2953/CMD 20/11/2024 60 M/S GHOSH ENTERPRISE 9.84 0.00 0 0
4093 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR LOHAI , SM/15565 Augmentation Conducting physical Household Survey at the IMIS reported village for HGJ certification and providing balance FHTC for Har Ghar Jal certification including conducting Gram Sabhas for different IMIS reported villages across the district under Burdwan Division, PHE Dte. AE(HQs),Assistant Engineer ,Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE.,Assistant Engineer, Durgapur Sub Division, P.H.E. Dte JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000428/2024-2025 3107/BWD 12/08/2024 90 TUBGRAM GRAMMYAK UNNAYAN SAMITY 309.60 0.00 0 50
4094 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR LOHAI , SM/15565 Augmentation Inter connection of pump at Bhanjapur including laying of pipe line due to widening of road & connection of pipe line to the higher dia. of LOHAI Piped Water Supply Scheme and its adjoining mouzas within RAINA-II BLOCK under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/001067/2024-2025 357/BWD 16/01/2025 86 ISHAN CONSTRUCTION 7.07 0.00 0 95
4095 PURBA BARDHAMAN Central Mechanical AUGMENTATION OF SATGACHIA PWSS (ZONE-I)(PART-B) , SM/15178 Augmentation Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination system and internal House wiring for Tube well no.- 1 & 2 at Augumentation of SATGACHIA(Z-I, Part-B)[MEMARI-II] Water Supply Scheme under CMD, PHE Dte., Dist.- Purba-Bardhaman ORD/000934/2023-2024 4197/CMD 29/08/2023 30 DAS TRADING CO. 24.41 0.00 0 0
4096 PURBA BARDHAMAN Central Mechanical AUGMENTATION OF SATGACHIA PWSS (ZONE-I)(PART-B) , SM/15178 Augmentation NEW SERVICE CONNECTION FOR AUGMENTATION OF SATGACHIA PWSS BILL/02825/2023-2024 BP-2023-24-593 04/03/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 5.58 0.00 0 0
4097 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF SATGACHIA PWSS (ZONE-I)(PART-B) , SM/15178 Augmentation Sinking of 300 X 200mm dia Tube Well 150 mtr. Depth by D.R. Rig method using UPVC pipe (CD) and UPVC Deep Well Screen (RDS) for SASINARA Z-I W/S Scheme at DEBIPUR Mouza under Memari-I Block and SATGACHIA Z-I W/S Scheme at BEGUNIA Mouza under Memari-II Block within Burdwan Sub-Division, PHE Dte. [For 02 Nos. Tube well]. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000192/2023-2024 2687/BWD 08/06/2023 60 ANIRUDDHA FARUQUE 26.48 0.00 0 50
4098 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF SATGACHIA PWSS (ZONE-I)(PART-B) , SM/15178 Augmentation Restoration of Pump House at Head Work site of Satgachia Zone-I Piped water supply scheme at Memari-II BlockUnder Burdwan Division, Dist.-Purba Bardhaman. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE,JUNIOR ENGINEER RWS BURDWAN SUB-DIVISION PHE DTE ORD/000179/2024-2025 998/BSD 06/06/2024 30 INDRAJIT MONDAL 0.96 0.21 21.88 90
4099 PURBA BARDHAMAN Central Mechanical AUGMENTATION OF SATGACHIA PWSS (ZONE-I)(PART-B) , SM/15178 Augmentation Illumination arrangement & different electro-mechanical works at SATGACHIA (Zone-I, Part-B) water supply scheme under Memari-II Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman ASSISTANT ENGINEER Junior Engineer ORD/000417/2024-2025 2801/CMD 01/10/2024 60 S.K. ELECTRICALS 12.53 0.00 0 0
4100 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF SATGACHIA PWSS (ZONE-I)(PART-B) , SM/15178 Augmentation Restoration of Conc. road, Providing leftout FHTC with extension of Pipeline, construction of Pathway, drain, repairing of Pump House at Head Work site with allied works for MAGRA, SANUI, SATGACHIA Zone-I & NARAGOHALIA PIPED WATER SUPPLY SCHEME, Block-Memari-I, within Burdwan Sub Division under Burdwan Division PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/001192/2024-2025 611/BWD 11/02/2025 180 M/S ASHA CONSTRUCTION 354.13 0.00 0 0
4101 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF SATGACHIA PWSS (ZONE-I)(PART-B) , SM/15178 Augmentation Different Types of work involved in connection with different Augmentation & Retrofitting Schemes (06 Nos.) Piped Water Supply Scheme under Memari II Block within Burdwan Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/001269/2024-2025 848/BWD 05/03/2025 120 PROJECT INDIA 394.29 0.00 0 0
4102 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF SATGACHIA PWSS (ZONE-I)(PART-B) , SM/15178 Augmentation 150MM DI bypass pipeline at DVC Canel side for smooth water supply for FHTC from Patra mouza to Katna, Shrirampur & Begunia mouza under satgachia zone- I pwss within Memari- II block under Burdwan Division PHE DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/001335/2024-2025 633/BSD 19/03/2025 30 M/S ANAND CONSTRUCTION 4.94 0.00 0 0
4103 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF SATGACHIA PWSS (ZONE-I)(PART-B) , SM/15178 Augmentation Laying of damaged pipeline for parhati & Satgachia zone -I pwss under MEMARI-II Block of Burdwan Sub-Division under Burdwan Division, PHE Dte JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/001334/2024-2025 632/BSD 19/03/2025 30 SAMANTA CONSTRUCTION 4.85 0.00 0 0
4104 PURBA BARDHAMAN Kalna - II Burdwan Division SABIDPUR PIPED WATER SUPPLY SCHEME , SM/16021 New Material Requisition To Resource Division RTOR000088/2023-2024 1962/BWD 25/04/2023 Resource Division 36.67 0.00 0 0
4105 PURBA BARDHAMAN Kalna - II Burdwan Division SABIDPUR PIPED WATER SUPPLY SCHEME , SM/16021 New Material Requisition To Resource Division RTOR000276/2023-2024 2197/BWD 12/05/2023 Resource Division 22.30 0.00 0 0
4106 PURBA BARDHAMAN Kalna - II Central Mechanical SABIDPUR PIPED WATER SUPPLY SCHEME , SM/16021 New Quotation for new electric service connection at Sabidpur PH NO.-1 BILL/01748/2023-2024 BP-2023-24-255 07/12/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 5.37 0.00 0 0
4107 PURBA BARDHAMAN Kalna - II Central Mechanical SABIDPUR PIPED WATER SUPPLY SCHEME , SM/16021 New New service connection for SABIDPUR PWSS TW-2. BILL/02400/2023-2024 BP-2023-24-502 06/02/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 7.96 0.00 0 0
4108 PURBA BARDHAMAN Kalna - II Burdwan Division SABIDPUR PIPED WATER SUPPLY SCHEME , SM/16021 New Work Order for "CONSTRUCTION OF TEMPORARY KIOSK FOR THE NECESSARY ARRANGEMENT OF ELECTRIFICATION OF TUBEWELL FOR SABIDPUR PWSS UNDER KALNA SUB-DIVISION UNDER BURDWAN DIVISION, PHE DTE." Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/001154/2023-2024 2150/KSD 07/03/2024 10 ER CONSTRUCTION & GENERAL ORDER SUPPLIER 0.66 0.00 0 2
4109 PURBA BARDHAMAN Kalna - II Central Mechanical SABIDPUR PIPED WATER SUPPLY SCHEME , SM/16021 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Khargakur & others water supply scheme under Kalna-2 Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000116/2024-2025 2393/CMD 02/08/2024 280 HANNAN BUILDERS PVT LTD 76.80 0.00 0 20
4110 PURBA BARDHAMAN Kalna - II Burdwan Division SABIDPUR PIPED WATER SUPPLY SCHEME , SM/16021 New Different Types of work involved in connection with Augmentation of 6 Nos. [(SM/07827), (SM/07866), (SM/16196), (SM/18314), (SM/16021), (SM/16019)] Piped Water Supply Scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/001144/2024-2025 618/BWD 11/02/2025 180 M/S DATTA ENTERPRISE 578.09 0.00 0 0
4111 PURBA BARDHAMAN Kalna - II Burdwan Division SABIDPUR PIPED WATER SUPPLY SCHEME , SM/16021 New Different works related (sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of different capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site) to KASIPUR, PATHAR GHATA & SABIDPUR Piped Water Supply Scheme under Kalna ¿ II Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000541/2023-2024 3697/BWD 24/08/2023 770 SUPRITI ENTERPRISE 1,185.67 0.00 0 42
4112 PURBA BARDHAMAN Kalna - II Central Mechanical SABIDPUR PIPED WATER SUPPLY SCHEME , SM/16021 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at SABIDPUR Water Supply Scheme [ Block- KALNA-2 ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. [2nd CALL] ASSISTANT ENGINEER JUNIOR ENGINEER ORD/001045/2023-2024 4193/CMD 29/08/2023 732 M/S. S.R. ENTERPRISE 27.74 0.00 0 45
4113 PURBA BARDHAMAN Ketugram - I Burdwan Division AMEGERIA PIPED WATER SUPPLY SCHEME , SM/16023 New Material Requisition To Resource Division RTOR000091/2023-2024 1962/BWD 25/04/2023 Resource Division 2.01 0.00 0 0
4114 PURBA BARDHAMAN Ketugram - I Burdwan Division AMEGERIA PIPED WATER SUPPLY SCHEME , SM/16023 New Material Requisition To Resource Division RTOR000741/2023-2024 5252/BWD 30/11/2023 Resource Division 20.18 0.00 0 0
4115 PURBA BARDHAMAN Ketugram - I Burdwan Division AMEGERIA PIPED WATER SUPPLY SCHEME , SM/16023 New Material Requisition To Resource Division RTOR000772/2023-2024 199/BWD 10/01/2024 Resource Division 11.48 0.00 0 0
4116 PURBA BARDHAMAN Ketugram - I Central Mechanical AMEGERIA PIPED WATER SUPPLY SCHEME , SM/16023 New Quotation for new service connection at Amegeria PWSS PH-I. BILL/00343/2024-2025 BP-2024-25-167 01/07/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 4.43 0.00 0 0
4117 PURBA BARDHAMAN Ketugram - I Central Mechanical AMEGERIA PIPED WATER SUPPLY SCHEME , SM/16023 New Quotation for new service connection at Amgoria PWSS TW 2. BILL/00445/2024-2025 BP-2024-25-232 30/07/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 0.65 0.00 0 0
4118 PURBA BARDHAMAN Ketugram - I Central Mechanical AMEGERIA PIPED WATER SUPPLY SCHEME , SM/16023 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Rajur & others water supply scheme under Ketugram-I Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. Driller In-Charge Junior Engineer ORD/000098/2024-2025 2407/CMD 02/08/2024 90 M.S. ENTERPRISE 82.29 0.00 0 0
4119 PURBA BARDHAMAN Ketugram - I Burdwan Division AMEGERIA PIPED WATER SUPPLY SCHEME , SM/16023 New Different works related (sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of different capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site) to AMEGERIA, ARGUN, CHINISPUR & KULUTIA Piped Water Supply Scheme under KETUGRAM -I Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer JUNIOR ENGINEER R.W.S. BURDWAN SUB-DIVISION PHE DTE ORD/000533/2023-2024 3630/BWD 21/08/2023 365 M/S GOUTAM DAS 1,421.70 0.00 0 75
4120 PURBA BARDHAMAN Ketugram - I Central Mechanical AMEGERIA PIPED WATER SUPPLY SCHEME , SM/16023 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at AMEGERIA Water Supply Scheme [ Block- KETUGRAM-1] under CMD, PHE Dte., Dist.- Purba-Bardhaman. Driller In-Charge Junior Engineer ORD/000902/2023-2024 4166/CMD 29/08/2023 640 M/S, S.DAS AND ENTERPRISE. 28.48 0.00 0 88
4121 PURBA BARDHAMAN Ketugram - I Burdwan Division AMEGERIA PIPED WATER SUPPLY SCHEME , SM/16023 New Road crossing through metal / concrete road by Jack Push Method for AMEGERIA (SM/16023), ARGUN (SM/16482), CHINISPUR (SM/15170) and KULITIA (SM/15167) PWSS under Ketugram I Development Block under Katwa Sub Division within Burdwan Division, PHE. Dte. Assistant Engineer ORD/001311/2024-2025 977/BWD 13/03/2025 60 M/S GOUTAM DAS 39.22 0.00 0 0
4122 PURBA BARDHAMAN Ketugram - I Burdwan Division KHANJI PIPED WATER SUPPLY SCHEME , SM/16476 New Material Requisition To Resource Division RTOR000099/2023-2024 1962/BWD 25/04/2023 Resource Division 5.23 0.00 0 0
4123 PURBA BARDHAMAN Ketugram - I Burdwan Division KHANJI PIPED WATER SUPPLY SCHEME , SM/16476 New Material Requisition To Resource Division RTOR000379/2023-2024 2197/BWD 12/05/2023 Resource Division 12.94 0.00 0 0
4124 PURBA BARDHAMAN Ketugram - I Burdwan Division KHANJI PIPED WATER SUPPLY SCHEME , SM/16476 New Material Requisition To Resource Division RTOR000748/2023-2024 5261/BWD 30/11/2023 Resource Division 20.18 0.00 0 0
4125 PURBA BARDHAMAN Ketugram - I Central Drilling KHANJI PIPED WATER SUPPLY SCHEME , SM/16476 New Providing drilling crew and other allied works or construction of Tube Well (250mm x 200mm x 114 Mtrs. Depth) by utilising Departmental machineries for Khanji Scheme (T/W-i & II) ketugram-I Block under Purba Bardhaman District, CDD PHE Dte. Driller In Charge Junior Engineer ORD/000055/2023-2024 861/CDD 10/07/2023 30 OSMAN SEKH 16.66 6.63 39.8 100
4126 PURBA BARDHAMAN Ketugram - I Central Mechanical KHANJI PIPED WATER SUPPLY SCHEME , SM/16476 New New service connection charges for Khanji PWSS TW-2 BILL/01665/2023-2024 BP-2023-24-223 10/11/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 2.96 0.00 0 0
4127 PURBA BARDHAMAN Ketugram - I Central Mechanical KHANJI PIPED WATER SUPPLY SCHEME , SM/16476 New Quotation for new electric service connection at Khanji PWSS TW No-1 BILL/01731/2023-2024 BP-2023-24-270 11/12/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 4.48 0.00 0 0
4128 PURBA BARDHAMAN Ketugram - I Central Mechanical KHANJI PIPED WATER SUPPLY SCHEME , SM/16476 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at KHANJI Water Supply Scheme [ Block- KETUGRAM-1] under CMD, PHE Dte., Dist.- Purba-Bardhaman. Driller In-Charge Junior Engineer ORD/000842/2023-2024 4114/CMD 29/08/2023 30 M/S. S.R. ENTERPRISE 29.41 11.56 39.31 97
4129 PURBA BARDHAMAN Ketugram - I Central Mechanical KHANJI PIPED WATER SUPPLY SCHEME , SM/16476 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Rajur & others water supply scheme under Ketugram-I Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. Driller In-Charge Junior Engineer ORD/000098/2024-2025 2407/CMD 02/08/2024 90 M.S. ENTERPRISE 82.29 0.00 0 0
4130 PURBA BARDHAMAN Ketugram - I Burdwan Division KHANJI PIPED WATER SUPPLY SCHEME , SM/16476 New Balance work for OHR, extension of pipeline to provide FHTC with sinking of tube well, construction of pump house, boundary wall, land development, plinth protection for pump house, approach road & other related work under Murgram, Moregram, Malgram, Khanji, PWSS under Katwa Sub Division, Block- Ketugram-I, Burdwan Division PHE Dte. Assistant Engineer JUNIOR ENGINEER R.W.S. BURDWAN SUB-DIVISION PHE DTE ORD/000289/2024-2025 2739/BWD 12/07/2024 120 PUSPA ENTERPRISE 185.75 0.00 0 72
4131 PURBA BARDHAMAN Ketugram - I Burdwan Division KHANJI PIPED WATER SUPPLY SCHEME , SM/16476 New Different works related (sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of different capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site) to MALGRAM, MURGRAM, MORGRAM & KHANJI Piped Water Supply Scheme under KETUGRAM -I Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer JUNIOR ENGINEER R.W.S. BURDWAN SUB-DIVISION PHE DTE ORD/000435/2023-2024 3387/BWD 03/08/2023 365 PUSPA ENTERPRISE 1,333.98 0.00 0 40
4132 PURBA BARDHAMAN Ketugram - I Burdwan Division KHANJI PIPED WATER SUPPLY SCHEME , SM/16476 New Material Requisition To Resource Division RTOR000054/2024-2025 334/BWD 15/01/2025 Resource Division 0.51 0.00 0 0
4133 PURBA BARDHAMAN Ketugram - I Central Mechanical KHANJI PIPED WATER SUPPLY SCHEME , SM/16476 New Quotation for new connection at Khanji PWSS(TW-3) BILL/01287/2024-2025 BP-2024-25-425 31/01/2025 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.24 0.00 0 null
4134 PURBA BARDHAMAN Mangolkote Burdwan Division PURBA NAYAPARA PIPE WATER SUPPLY SCHEME , SM/16477 New Material Requisition To Resource Division RTOR000039/2023-2024 1962/BWD 25/04/2023 Resource Division 1.93 0.00 0 0
4135 PURBA BARDHAMAN Mangolkote Burdwan Division PURBA NAYAPARA PIPE WATER SUPPLY SCHEME , SM/16477 New Material Requisition To Resource Division RTOR000266/2023-2024 2197/BWD 12/05/2023 Resource Division 15.26 0.00 0 0
4136 PURBA BARDHAMAN Mangolkote Burdwan Division PURBA NAYAPARA PIPE WATER SUPPLY SCHEME , SM/16477 New Material Requisition To Resource Division RTOR000730/2023-2024 5231/BWD 30/11/2023 Resource Division 20.37 0.00 0 0
4137 PURBA BARDHAMAN Mangolkote Central Mechanical PURBA NAYAPARA PIPE WATER SUPPLY SCHEME , SM/16477 New New service connection for Purba Nayapara PWSS TW 1. BILL/02911/2023-2024 BP-2023-24-621 07/03/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 4.46 0.00 0 0
4138 PURBA BARDHAMAN Mangolkote Central Mechanical PURBA NAYAPARA PIPE WATER SUPPLY SCHEME , SM/16477 New New service connection for Purba Nayapara PWSS TW 2. BILL/02912/2023-2024 BP-2023-24-622 07/03/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 7.56 0.00 0 0
4139 PURBA BARDHAMAN Mangolkote Central Mechanical PURBA NAYAPARA PIPE WATER SUPPLY SCHEME , SM/16477 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at PURBA NAYAPARA Water Supply Scheme [ Block- MANGOLKOTE] under CMD, PHE Dte., Dist.- Purba-Bardhaman. Driller In-Charge Junior Engineer ORD/000874/2023-2024 4137/CMD 29/08/2023 30 P.K. ENGINEERING 29.60 0.00 0 88
4140 PURBA BARDHAMAN Mangolkote Central Mechanical PURBA NAYAPARA PIPE WATER SUPPLY SCHEME , SM/16477 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Lakshimpur & others water supply scheme under Mangalkote Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman Driller In-Charge Junior Engineer ORD/000097/2024-2025 2406/CMD 02/08/2024 290 CHOUDHURY ENTERPRISE 57.65 0.00 0 10
4141 PURBA BARDHAMAN Mangolkote Burdwan Division PURBA NAYAPARA PIPE WATER SUPPLY SCHEME , SM/16477 New Different works related (sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of different capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site) to PALISGRAM, PURBA NAYAPARA & SITAHATI Piped Water Supply Scheme under MONGALKOTE Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer JUNIOR ENGINEER KATWA SUB-DIVISION PHE DTE,JUNIOR ENGINEER R.W.S. BURDWAN SUB-DIVISION PHE DTE ORD/000695/2023-2024 4364/BWD 04/10/2023 668 M/S S. CHOUDHURY 1,505.07 0.00 0 77
4142 PURBA BARDHAMAN Mangolkote Burdwan Division PURBA NAYAPARA PIPE WATER SUPPLY SCHEME , SM/16477 New Different types of works involve in connection with implementation of Aug. Mongalkote, Palishgram, Purba Nowapara, Sitahati, Singhi, Mejhiary & Karui Piped Water Supply Scheme within Katwa Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer ORD/001191/2024-2025 873/BWD 06/03/2025 180 M/S S. CHOUDHURY 588.22 0.00 0 0
4143 PURBA BARDHAMAN Kalna - II Burdwan Division BALINDAR PIPED WATER SUPPLY SCHEME , SM/16478 New Material Requisition To Resource Division RTOR000056/2023-2024 1962/BWD 25/04/2023 Resource Division 45.18 0.00 0 0
4144 PURBA BARDHAMAN Kalna - II Burdwan Division BALINDAR PIPED WATER SUPPLY SCHEME , SM/16478 New Material Requisition To Resource Division RTOR000204/2023-2024 2155/BWD 10/05/2023 Resource Division 11.21 0.00 0 0
4145 PURBA BARDHAMAN Kalna - II Central Mechanical BALINDAR PIPED WATER SUPPLY SCHEME , SM/16478 New New service connection charges for Balindar PWSS TW-1 BILL/01867/2023-2024 BP-2023-24-357 11/01/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 4.20 0.00 0 0
4146 PURBA BARDHAMAN Kalna - II Central Mechanical BALINDAR PIPED WATER SUPPLY SCHEME , SM/16478 New New service connection for BALINDAR PWSS TW-2. BILL/02401/2023-2024 BP-2023-24-503 06/02/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 8.97 0.00 0 0
4147 PURBA BARDHAMAN Kalna - II Burdwan Division BALINDAR PIPED WATER SUPPLY SCHEME , SM/16478 New Work Order for "CONSTRUCTION OF TEMPORARY KIOSK FOR THE NECESSARY ARRANGEMENT OF ELECTRIFICATION OF TUBEWELL FOR BALINDAR PWSS UNDER KALNA SUB-DIVISION UNDER BURDWAN DIVISION, PHE DTE." Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/001150/2023-2024 2106/KSD 04/03/2024 10 ER CONSTRUCTION & GENERAL ORDER SUPPLIER 0.66 0.00 0 2
4148 PURBA BARDHAMAN Kalna - II Central Mechanical BALINDAR PIPED WATER SUPPLY SCHEME , SM/16478 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Khargakur & others water supply scheme under Kalna-2 Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000116/2024-2025 2393/CMD 02/08/2024 280 HANNAN BUILDERS PVT LTD 76.80 0.00 0 20
4149 PURBA BARDHAMAN Kalna - II Burdwan Division BALINDAR PIPED WATER SUPPLY SCHEME , SM/16478 New Work order for "Restoration of pipeline with other allied works at different places of Bharkunda,potna,Bara dhamash,Balindar,Tola mouja under Balindar Pwss due to construction of rcc cover drain & widening of rcc concrete road constructed by PRI body under Kalna-II panchayat samiti under Kalna Sub-Division under Burdwan Division, PHE Dte.". Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000858/2024-2025 1844/KSD 27/11/2024 15 SUPRITI ENTERPRISE 2.86 0.00 0 0
4150 PURBA BARDHAMAN Kalna - II Burdwan Division BALINDAR PIPED WATER SUPPLY SCHEME , SM/16478 New Material Requisition To Resource Division RTOR000040/2024-2025 320/BWD 15/01/2025 Resource Division 4.26 0.00 0 0
4151 PURBA BARDHAMAN Kalna - II Burdwan Division BALINDAR PIPED WATER SUPPLY SCHEME , SM/16478 New Different works related (sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of different capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site) to BALINDAR, CHAK SHIMLA & DWARIATAN Piped Water Supply Scheme under Kalna II Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000539/2023-2024 3700/BWD 24/08/2023 770 SUPRITI ENTERPRISE 1,424.22 0.00 0 30
4152 PURBA BARDHAMAN Kalna - II Central Mechanical BALINDAR PIPED WATER SUPPLY SCHEME , SM/16478 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at BALINDAR Water Supply Scheme [ Block- KALNA-2] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000858/2023-2024 4126/CMD 29/08/2023 756 ASIA CONSTRUCTION. 28.98 0.00 0 90
4153 PURBA BARDHAMAN Kalna - II Burdwan Division BALINDAR PIPED WATER SUPPLY SCHEME , SM/16478 New Providing of Balance FHTC and other allied works at Baradhamas Mouza under the command area of Balindar Piped Water Supply Scheme (SM/16478) in order to declare Sajalgram under Kalna-II Block under Kalna Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer ORD/000021/2025-2026 1248/BWD 23/04/2025 30 GOPINATH ENTERPRISE 13.68 0.00 0 0
4154 PURBA BARDHAMAN Kalna - II Burdwan Division BALINDAR PIPED WATER SUPPLY SCHEME , SM/16478 New Providing of Balance FHTC and other allied works at Bhurkunda & Balindar Mouza under the command area of Balindar Piped Water Supply Scheme (SM/16478) in order to declare Sajalgram under Kalna-II Block under Kalna Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer ORD/000023/2025-2026 1250/BWD 23/04/2025 30 GOPINATH ENTERPRISE 12.19 0.00 0 0
4155 PURBA BARDHAMAN Kalna - II Burdwan Division BALINDAR PIPED WATER SUPPLY SCHEME , SM/16478 New Construction of Pipe carrying Truss Bridge for carrying 200 mm dia MS Pipe at PWD Bridge under Hatgachha Mouza under the command area of Balindar PWSS (SM/16478) within Kalna -II block of Kalna Sub-Division, PHE Dte under Burdwan Division, PHE Dte. Assistant Engineer ORD/000017/2025-2026 1244/BWD 23/04/2025 60 M/S DATTA ENTERPRISE 29.30 0.00 0 1
4156 PURBA BARDHAMAN Kalna - II Burdwan Division BALINDAR PIPED WATER SUPPLY SCHEME , SM/16478 New Providing of Balance FHTC and other allied works at Tola Mouza under the command area of Balindar Piped Water Supply Scheme (SM/16478) in order to declare Sajalgram under Kalna-II Block under Kalna Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer ORD/000019/2025-2026 1246/BWD 23/04/2025 30 GOPINATH ENTERPRISE 15.44 0.00 0 1
4157 PURBA BARDHAMAN Purbasthali - I Burdwan Division GAHAK PIPE WATER SUPPLY SCHEME , SM/16303 New Material Requisition To Resource Division RTOR000252/2023-2024 2197/BWD 12/05/2023 Resource Division 7.50 0.00 0 0
4158 PURBA BARDHAMAN Purbasthali - I Burdwan Division GAHAK PIPE WATER SUPPLY SCHEME , SM/16303 New Material Requisition To Resource Division RTOR000548/2023-2024 4308/BWD 29/09/2023 Resource Division 0.81 0.00 0 0
4159 PURBA BARDHAMAN Purbasthali - I Central Mechanical GAHAK PIPE WATER SUPPLY SCHEME , SM/16303 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at GAHAK Water Supply Scheme [ Block- PURBASTHALI -1 ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. [3rd CALL] ORD/000929/2023-2024 4192/CMD 29/08/2023 30 SOUNAK ENTERPRISE 21.33 0.00 0 0
4160 PURBA BARDHAMAN Purbasthali - I Burdwan Division GAHAK PIPE WATER SUPPLY SCHEME , SM/16303 New Material Requisition To Resource Division RTOR000591/2023-2024 4899/BWD 10/11/2023 Resource Division 15.99 0.00 0 0
4161 PURBA BARDHAMAN Purbasthali - I Central Mechanical GAHAK PIPE WATER SUPPLY SCHEME , SM/16303 New New service connection for Gahak PWSS TW-1. BILL/02393/2023-2024 BP-2023-24-497 06/02/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.70 0.00 0 0
4162 PURBA BARDHAMAN Purbasthali - I Central Mechanical GAHAK PIPE WATER SUPPLY SCHEME , SM/16303 New New service connection for Gahak PWSS TW-2. BILL/02392/2023-2024 BP-2023-24-498 06/02/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 5.70 0.00 0 0
4163 PURBA BARDHAMAN Purbasthali - I Burdwan Division GAHAK PIPE WATER SUPPLY SCHEME , SM/16303 New Different works related (sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of different capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site) to SHYAMPUR, GAHAK & SHANKRA Piped Water Supply Scheme under Purbasthali I Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000639/2023-2024 3957/BWD 07/09/2023 365 M/S B. NANDI 758.52 0.00 0 20
4164 PURBA BARDHAMAN Purbasthali - I Burdwan Division GAHAK PIPE WATER SUPPLY SCHEME , SM/16303 New Work Order for "CONSTRUCTION OF TEMPORARY KIOSK FOR THE NECESSARY ARRANGEMENT OF ELECTRIFICATION OF TUBEWELL FOR GAHAK PWSS UNDER KALNA SUB-DIVISION UNDER BURDWAN DIVISION, PHE DTE." Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000571/2024-2025 1017/KSD 07/08/2024 15 DEL DELTA CONSTRUCTION 0.66 0.00 0 100
4165 PURBA BARDHAMAN Purbasthali - I Central Mechanical GAHAK PIPE WATER SUPPLY SCHEME , SM/16303 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Manganpur & others water supply scheme under Purbasthali 1 Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000714/2024-2025 2979/CMD 25/11/2024 90 H.K. DAS & CO. 53.27 0.00 0 0
4166 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF KULTI PIPED WATER SUPPLY SCHEME , SM/16301 Augmentation Augmentation of KULTI PWSS to accommodate FHTC, Laying Distribution System, Laying Rising Main, under Jal Jeevan Mission of Kalna - II Block, Purba Burdwan District under Burdwan Division, PHE.Dte. ORD/000588/2023-2024 3747/BWD 28/08/2023 60 MAHALAXMI CONSTRUCTION 21.92 0.00 0 0
4167 PURBA BARDHAMAN Central Mechanical AUGMENTATION OF KULTI PIPED WATER SUPPLY SCHEME , SM/16301 Augmentation New service connection for augmentation of Kulti PH-3 PWSS. BILL/00086/2024-2025 BP-2024-25-29 19/04/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 4.70 0.00 0 0
4168 PURBA BARDHAMAN Central Mechanical AUGMENTATION OF KULTI PIPED WATER SUPPLY SCHEME , SM/16301 Augmentation Additional Quotation for augmentation of Kulti PWSS PH 3 BILL/00938/2024-2025 BP-2024-25-407 11/12/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 1.79 0.00 0 0
4169 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF KULTI PIPED WATER SUPPLY SCHEME , SM/16301 Augmentation Different types of works involve in connection with Augmentation of KULTI (SM/16301) Water Supply Scheme, Block Kalna II under Burdwan Division, PHE Dte. Assistant Engineer JUNIOR ENGINEER RWS KALNA2 ORD/000235/2024-2025 2553/BWD 04/07/2024 120 HAMID SK 222.11 41.86 18.85 1
4170 PURBA BARDHAMAN Central Mechanical AUGMENTATION OF KULTI PIPED WATER SUPPLY SCHEME , SM/16301 Augmentation Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination system and internal House wiring for Tube well no.- 1, 2 & 3 at Augmentation of KULTI[KALNA-II]] Water Supply Scheme under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER Junior Engineer ORD/001081/2023-2024 4439/CMD 04/10/2023 698 CHOUDHURY ENTERPRISE 36.64 0.00 0 33
4171 PURBA BARDHAMAN Central Mechanical AUGMENTATION OF KULTI PIPED WATER SUPPLY SCHEME , SM/16301 Augmentation Illumination arrangement at Kulti water supply scheme under Kalna 2 Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000407/2024-2025 2787/CMD 01/10/2024 334 DELTA ENGINEERING ENTERPRISE 10.70 0.00 0 30
4172 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR PALLA , SM/16192 Augmentation Augmentation of PALLA PWSS to accommodate FHTC, Laying Distribution System, Laying Rising Main, under Jal Jeevan Mission of Memari - I Block, Purba Burdwan District under Burdwan Division, PHE. Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. Junior Engineer, RWS, Memari-I Dev. Bolck ORD/000099/2023-2024 2415/BWD 29/05/2023 30 LAKSHMIKANTA DAS 11.03 0.00 0 0
4173 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR PALLA , SM/16192 Augmentation Preparation and Submission of DPR for Augmentation of Palla PWSS under Memari-I Development Block under Burdwan Division, P.H.E Dte.[2nd Call] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000397/2023-2024 1585/BSD 24/07/2023 15 MEASURE LAND 0.78 0.77 98.72 100
4174 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR PALLA , SM/16192 Augmentation Sinking of 300 X 200mm dia Tube Well 150 mtr. Depth by D.R. Rig method using UPVC pipe (CD) and UPVC Deep Well Screen (RDS) for 3RD TW site of PALLA W/S Scheme under Memari - I Block within Burdwan Sub-Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000203/2023-2024 2706/BWD 08/06/2023 30 DAS CONSTRUCTION 13.26 5.95 44.87 100
4175 PURBA BARDHAMAN Central Mechanical AUGMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR PALLA , SM/16192 Augmentation NEW SERVICE CONNECTION FOR PALLA PWSS BILL/02597/2023-2024 BP-2023-24-553 20/02/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 7.35 0.00 0 0
4176 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR PALLA , SM/16192 Augmentation Construction of switch rooms & Rising main at different TW site for PALLA Piped Water Supply Scheme under Memari - I Block, District:- Purba-Bardhaman under Burdwan Division, PHE. Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. Junior Engineer, RWS, Memari-I Dev. Bolck ORD/000592/2023-2024 3765/BWD 29/08/2023 60 SANDIP SARKAR 7.52 0.00 0 98
4177 PURBA BARDHAMAN Central Mechanical AUGMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR PALLA , SM/16192 Augmentation Additional quotation for installation of DTR 25KVA at Palla PWSS PH-2 BILL/00441/2024-2025 BP-2024-25-235 30/07/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 4.51 0.00 0 0
4178 PURBA BARDHAMAN Central Mechanical AUGMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR PALLA , SM/16192 Augmentation Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination system and internal House wiring for Tube well no.- 1 at Augmentation of PALLA[MEMARI-I] Water Supply Scheme under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER Junior Engineer ORD/000573/2023-2024 3903/CMD 18/08/2023 30 SIMARR 11.88 0.00 0 100
4179 PURBA BARDHAMAN Central Mechanical AUGMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR PALLA , SM/16192 Augmentation Supply & installation of Automatic Chlorinator at Palla water supply scheme, P.H. No.- II under CMD, P.H.E. Dte., Dist.- Purba Bardhaman. ASSISTANT ENGINEER Junior Engineer ORD/000243/2024-2025 726/CMSD 10/05/2024 10 MITRA ENTERPRISE 0.96 0.00 0 100
4180 PURBA BARDHAMAN Central Mechanical AUGMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR PALLA , SM/16192 Augmentation Illumination arrangement & different electro-mechanical works at PALLA and others water supply scheme under Memari-I Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. ASSISTANT ENGINEER Junior Engineer ORD/000441/2024-2025 2798/CMD 01/10/2024 60 SUBRATA BHADRA 15.45 0.00 0 0
4181 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR PALLA , SM/16192 Augmentation Laying distribution pipe line, FHTC, 3rd tube well installation, Construction of switch room and boundary wall for PALLA village under Augmentation of PALLA Piped Water Supply Scheme, Block - Memari - I, under Burdwan Division, P.H.E. Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. Junior Engineer, RWS, Memari-I Dev. Bolck ORD/000876/2023-2024 5329/BWD 04/12/2023 502 SARKAR AGENCY 136.31 0.00 0 95
4182 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED NANDRA PIPE WATER SUPPLY SCHEME , SM/15725 Augmentation Preparation and Submission of DPR for Augmentation of Nandra PWSS under Burdwan-II Development Block under Burdwan Division, P.H.E Dte.[2nd Call] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. Junior Engineer, Burdwan Sadar Sub-Division ORD/000349/2023-2024 1476/BSD 12/07/2023 15 CARTO 0.78 0.38 48.72 100
4183 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED NANDRA PIPE WATER SUPPLY SCHEME , SM/15725 Augmentation Augmentation of NADRA Piped Water Supply Scheme Construction of 200 cum capacity RCC OHR with 20.0 mtr. with Staging height including soil investigation & Rising Main under BARDHAMAN-II Block, District:- Purba-Bardhaman. _2ND CALL ORD/000965/2023-2024 002/BWD 02/01/2024 180 R.G. INFRASTRUCTURE 72.79 0.00 0 0
4184 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED NANDRA PIPE WATER SUPPLY SCHEME , SM/15725 Augmentation Continuation Work for the supply of one no. Diesel driven Motor Cab/Maxi Cab (Air Conditioner) on hire basis for the office of the Assistant Engineer, to be used by the Assistant Engineer, RWS Burdwan Sub-Divn., PHE. Dte. (Period from 01/03/2024 to 30/04/2024) Contractual Junior Engineer,Junior Engineer, R.W.S. Burdwan Sub Division, P.H.E. Dt ORD/001222/2023-2024 62/RWS 27/02/2024 60 MD HASIN 0.80 0.00 0 0
4185 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED NANDRA PIPE WATER SUPPLY SCHEME , SM/15725 Augmentation Different Types of work involved in connection with different Augmentation & New Schemes (11 Nos.) Piped Water Supply Scheme under Burdwan II Block within Burdwan Sub-Div., under Burdwan Division PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/001349/2024-2025 1060/BWD 25/03/2025 120 R.G. INFRASTRUCTURE 262.23 0.00 0 0
4186 PURBA BARDHAMAN Central Mechanical AUGMENTATION OF TALIT-SIMDAL PWSS (PART-B) , SM/18112 Augmentation New service connection charges for Aug. Talit-Simdal PWSS TW-3 BILL/00758/2023-2024 BP-2023-24-58 17/07/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 1.36 0.00 0 0
4187 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF TALIT-SIMDAL PWSS (PART-B) , SM/18112 Augmentation Construction of Pump House cum chlorine room without sanitary and water supply arrangement at Tube Well Site to departmental drawing no-PHE/BD/P.H/DRG/02/DEC-17 (Size 3.60 mtr x 3.00 mtr room) for TALIT its Adjoining Mouza W/S Scheme, Block -Bardhaman-I within Burdwan Sub-Division, PHE Dte. (Mouza- TALIT) Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000838/2022-2023 500/BSD 21/03/2023 45 MAHAKE CONTRACTOR & GENERAL ORDER SUPPLIERS 3.16 2.59 81.96 100
4188 PURBA BARDHAMAN Central Mechanical AUGMENTATION OF TALIT-SIMDAL PWSS (PART-B) , SM/18112 Augmentation Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination system and internal House wiring for Tube well no.- 1 & 2 at Augmentation of TALIT SIMDAL( Part-B)[BURDWAN-I] Water Supply Scheme under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER Junior Engineer ORD/000570/2023-2024 3900/CMD 18/08/2023 30 CINZANO 22.41 10.54 47.03 40
4189 PURBA BARDHAMAN Central Mechanical AUGMENTATION OF TALIT-SIMDAL PWSS (PART-B) , SM/18112 Augmentation Illumination arrangement & different electro-mechanical works at TALIT SIMDAL water supply scheme under Bardhaman-I Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. ASSISTANT ENGINEER Junior Engineer ORD/000480/2024-2025 2957/CMD 20/11/2024 60 SUDIKSHA CONSTRUCTION 17.91 0.00 0 0
4190 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF TALIT-SIMDAL PWSS (PART-B) , SM/18112 Augmentation Continuation for the work of Supply of one No. Diesel Driven Car (other than Ambasader) on hire basis for the office of the Assistant Engineer, RWS Burdwan Sub-Division, PHE Dte. (Period from 01-03-2025 to 30-04-2025) ASSISTANT ENGINEER R.W.S. BURDWAN SUB-DIVISION PHE DTE Contractual Junior Engineer ORD/001236/2024-2025 68/RWS 28/02/2025 60 MD HASIN 0.80 0.00 0 0
4191 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF TALIT-SIMDAL PWSS (PART-B) , SM/18112 Augmentation Balance Work for extension of pipe lines to provide FHTC With Sinking of Tub well , Construction of pump house with Boundary wall & other related work for TALIT-SIMDAL (SM/18112), NABABHAT (SM-15166) and DEWANDIGHI-MIRJAPUR (SM/09494) PWSS under Burdwan Sub-Div., Block -Bwn-1, under Burdwan Division PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/001248/2024-2025 793/BWD 03/03/2025 120 M/S S.S. ENTERPRISE 227.66 0.00 0 0
4192 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF TALIT-SIMDAL PWSS (PART-B) , SM/18112 Augmentation 150MM DI bypass pipeline at KHETIA mouza for smooth water supply for FHTC under KHETIA & Talit Simdal pwss within Bardhaman- I block under Burdwan Division PHE DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/001080/2024-2025 111/BSD 16/01/2025 30 ROY CONSTRUCTION 4.77 0.00 0 100
4193 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF TALIT-SIMDAL PWSS (PART-B) , SM/18112 Augmentation Different type of works related (Drain, Internal pathways, Land-Development, repair of boundary wall & pump houses (3 Nos), Repair of old OHR and road restoration) under Dewandighi & Talit Simdal PWSS under Burdwan-I Block under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JE (RWS) Burdwan-I Block,Junior Engineer, Burdwan Sadar Sub-Division ORD/000853/2024-2025 4139/BWD 27/11/2024 90 SANDIP SARKAR 12.10 0.00 0 85
4194 PURBA BARDHAMAN Kalna - II Burdwan Division JIUDHARA PWSS , SM/18314 New Material Requisition To Resource Division RTOR000295/2023-2024 2197/BWD 12/05/2023 Resource Division 18.12 0.00 0 0
4195 PURBA BARDHAMAN Kalna - II Burdwan Division JIUDHARA PWSS , SM/18314 New Material Requisition To Resource Division RTOR000525/2023-2024 4291/BWD 29/09/2023 Resource Division 50.47 0.00 0 0
4196 PURBA BARDHAMAN Kalna - II Central Mechanical JIUDHARA PWSS , SM/18314 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1, 2 & 3 at JIUDHARA Water Supply Scheme [ Block- KALNA-2 ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000900/2023-2024 4164/CMD 29/08/2023 30 DUTTA ENTERPRISE 44.40 0.00 0 0
4197 PURBA BARDHAMAN Kalna - II Burdwan Division JIUDHARA PWSS , SM/18314 New Material Requisition To Resource Division RTOR000629/2023-2024 4877/BWD 10/11/2023 Resource Division 26.94 0.00 0 0
4198 PURBA BARDHAMAN Kalna - II Central Mechanical JIUDHARA PWSS , SM/18314 New New service connection for Jewdhara PWSS PH-1 BILL/02314/2023-2024 BP-2023-24-458 30/01/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 8.55 0.00 0 0
4199 PURBA BARDHAMAN Kalna - II Central Mechanical JIUDHARA PWSS , SM/18314 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Khargakur & others water supply scheme under Kalna-2 Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000116/2024-2025 2393/CMD 02/08/2024 280 HANNAN BUILDERS PVT LTD 76.80 0.00 0 20
4200 PURBA BARDHAMAN Kalna - II Burdwan Division JIUDHARA PWSS , SM/18314 New JIUDHARA Piped Water Supply Scheme with sinking of Tube-well, LDS, Rising Main, FHTC, Construction of 400 cum capacity RCC OHR with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drain and internal pathway at different TW site under Kalna II Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE,Junior Engineer, R.W.S. Burdwan Sub Division, P.H.E. Dt ORD/000719/2023-2024 4534/BWD 13/10/2023 365 SOMNATH ROY CHOWDHURY 625.16 0.00 0 45
4201 PURBA BARDHAMAN Kalna - II Central Mechanical JIUDHARA PWSS , SM/18314 New New service connection at jiudhara Pwss Tw-02 BILL/01348/2024-2025 BP-2024-25-432 31/01/2025 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 7.51 0.00 0 null
4202 PURBA BARDHAMAN Kalna - II Burdwan Division JIUDHARA PWSS , SM/18314 New Work order for "CONSTRUCTION OF TEMPORARY KIOSK FOR THE NECESSARY ARRANGEMENT OF ELECTRIFICATION OF TUBEWELL FOR JIUDHARA PWSS UNDER KALNA SUB-DIVISION UNDER BURDWAN DIVISION, PHE DTE." Assistant Engineer Junior Engineer, R.W.S. Burdwan Sub Division, P.H.E. Dt ORD/000961/2024-2025 1231/KSD 27/09/2024 15 DEL DELTA CONSTRUCTION 0.66 0.00 0 100
4203 PURBA BARDHAMAN Kalna - II Burdwan Division JIUDHARA PWSS , SM/18314 New Different Types of work involved in connection with Augmentation of 6 Nos. [(SM/07827), (SM/07866), (SM/16196), (SM/18314), (SM/16021), (SM/16019)] Piped Water Supply Scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/001144/2024-2025 618/BWD 11/02/2025 180 M/S DATTA ENTERPRISE 578.09 0.00 0 0
4204 PURBA BARDHAMAN Kalna - II Central Mechanical JIUDHARA PWSS , SM/18314 New wbsedcl quotation for new service connection at Jiudhara pwss ph-03 BILL/01574/2024-2025 BP-2024-25-480 27/03/2025 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.36 0.00 0 null
4205 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Kulti Piped Water Supply Scheme at Kalna-II Block , SM/07826 Retrofitting Providing Functional Household tap connection (FHTC) from existing distribution system within the command area of Kulti piped water supply scheme at Chagram village (Chagram habitation), Dakshin Krishnapur village (Krishnapur habitation), Kala village (Anandanagar, Baganpara, Kala & Saklompur habitation), Kulti village (Dhapaspara & Kulti habitation), Dampara village (Dampara habitation) & Kashipur village (Kashipur habitation), Kalna-II Block under Burdwan Division, PHE Dte.[Tr No.-108/SE/CC/20-21] Assistant Engineer ORD/000405/2020-2021 1130/BWD 09/02/2021 60 UMWELT ENGINEER PVT LTD 103.15 31.07 30.12 1
4206 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Kulti Piped Water Supply Scheme at Kalna-II Block , SM/07826 Retrofitting Providing leftout water tap connection in different villages for 100% coverage to make it Sajal Gram from existing distribution system within scheme jurisdiction of different Piped Water Supply Schemes within Kalna ¿ II Block under Burdwan Division, PHE. Dte. Assistant Engineer JUNIOR ENGINEER R.W.S. BURDWAN SUB-DIVISION PHE DTE ORD/000476/2021-2022 943/BWD 17/02/2022 30 UDYOG CONSTRUCTION 5.27 2.33 44.21 100
4207 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Kulti Piped Water Supply Scheme at Kalna-II Block , SM/07826 Retrofitting Restoration work of Singerkone to Pandua Kulti road via badla from 0.00 km to 2.90 km, (in stretches) damaged due to laying of underground water pipe line by PHE with box cutting and Jhama with moorum consolidation under-Kalna Highvway Sub Division of Burdwan South Highway Division, P.W(Roads)Dte. during the year 2023-24. BILL/00648/2024-2025 825/JJM 13/09/2024 EXECUTIVE ENGINEER BURDWAN SOUTH HIGHWAY DIVISION P.W. (ROADS) DTE. 5.36 0.00 0 null
4208 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Kulti Piped Water Supply Scheme at Kalna-II Block , SM/07826 Retrofitting Different types of works involve in connection with Augmentation of KULTI (SM/16301) Water Supply Scheme, Block Kalna II under Burdwan Division, PHE Dte. Assistant Engineer JUNIOR ENGINEER RWS KALNA2 ORD/000235/2024-2025 2553/BWD 04/07/2024 120 HAMID SK 222.11 0.00 0 1
4209 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Kulti Piped Water Supply Scheme at Kalna-II Block , SM/07826 Retrofitting Construction of 1.5 Mtrs. height boundary wall along with 750 mm height 3 layer barbed wire in connection with KULTI Piped W/S. Scheme under Kalna Sub Division under Burdwan Division, PHE. Dte. Assistant Engineer JUNIOR ENGINEER RWS KALNA2 ORD/001230/2024-2025 768/BWD 27/02/2025 30 GOPINATH ENTERPRISES 15.13 0.00 0 100
4210 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Kulti Piped Water Supply Scheme at Kalna-II Block , SM/07826 Retrofitting Construction of approach road along with Land Development work in connection with retrofitting of KULTI PWSS (SM/07826) under Kalna Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer ORD/000025/2025-2026 1252/BWD 23/04/2025 21 GOPINATH ENTERPRISE 10.18 0.00 0 0
4211 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Kulti Piped Water Supply Scheme at Kalna-II Block , SM/07826 Retrofitting Restoration work of Kulti Bakultala Jewdhara Road from 6.50 km to 9.70km (in stretches) (Withheld 50%as per GO issued by PWD & PHE). BILL/00083/2025-2026 null 25/04/2025 EXECUTIVE ENGINEER BURDWAN SOUTH HIGHWAY DIVISION P.W. (ROADS) DTE. 4.52 0.00 0 null
4212 PURBA BARDHAMAN Khandaghosh Burdwan Division BERUGRAM PIPED WATER SUPPLY SCHEME , SM/18606 New Material Requisition To Resource Division RTOR000249/2023-2024 2197/BWD 12/05/2023 Resource Division 17.09 0.00 0 0
4213 PURBA BARDHAMAN Khandaghosh Burdwan Division BERUGRAM PIPED WATER SUPPLY SCHEME , SM/18606 New Material Requisition To Resource Division RTOR000523/2023-2024 4289/BWD 29/09/2023 Resource Division 16.32 0.00 0 0
4214 PURBA BARDHAMAN Khandaghosh Central Mechanical BERUGRAM PIPED WATER SUPPLY SCHEME , SM/18606 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at Berugram Water Supply Scheme [ Block- Khandoghosh ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. [3rd CALL] ASSISTANT ENGINEER Junior Engineer ORD/000932/2023-2024 4195/CMD 29/08/2023 30 M/S, S.DAS AND ENTERPRISE. 29.71 0.00 0 0
4215 PURBA BARDHAMAN Khandaghosh Burdwan Division BERUGRAM PIPED WATER SUPPLY SCHEME , SM/18606 New Material Requisition To Resource Division RTOR000655/2023-2024 5114/BWD 23/11/2023 Resource Division 20.46 0.00 0 0
4216 PURBA BARDHAMAN Khandaghosh Central Mechanical BERUGRAM PIPED WATER SUPPLY SCHEME , SM/18606 New Quotation for new service connection at Berugram W/S Scheme PH-I. BILL/01804/2023-2024 BP-2023-24-323 30/12/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 2.94 0.00 0 0
4217 PURBA BARDHAMAN Khandaghosh Central Mechanical BERUGRAM PIPED WATER SUPPLY SCHEME , SM/18606 New New Service connection for Berugram PWSS TW-2. BILL/02333/2023-2024 BP-2023-24-475 31/01/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 7.69 0.00 0 0
4218 PURBA BARDHAMAN Khandaghosh Burdwan Division BERUGRAM PIPED WATER SUPPLY SCHEME , SM/18606 New Land demarcation and preparation of sketch map for Haldi, Sultanpur, Berugram & Karail Piped W/S. Scheme (New Scheme) at different Blocks under JJM under Burdwan Division, PHE Dte. AE(HQs) J.E. 1 BURDWAN ORD/000756/2023-2024 842/AE/HQ 01/11/2023 15 M/S S. CHOUDHURY 0.33 0.00 0 100
4219 PURBA BARDHAMAN Khandaghosh Central Mechanical BERUGRAM PIPED WATER SUPPLY SCHEME , SM/18606 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at KHEJURHATI & others water supply scheme under Khandoghosh Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman ASSISTANT ENGINEER Junior Engineer ORD/000071/2024-2025 2391/CMD 02/08/2024 90 C.M. ENTERPRISE 45.81 0.00 0 0
4220 PURBA BARDHAMAN Khandaghosh Burdwan Division BERUGRAM PIPED WATER SUPPLY SCHEME , SM/18606 New Continuation for the work of Supply of Inspection Vehicle for inspection of different JJM related (Schemes) works as and when required including supply of driver & fuel (minimum 8 Hours duty per day) and all taxes etc. for Durgapur Sub-Division under BurdwanDivision, P.H.E. Dte.consider 96.00 Km. run per day [Period NOV.'2024 to JAN.'2025] ORD/000847/2024-2025 886/DSD 21/10/2024 78 MD HASIN 1.00 0.00 0 0
4221 PURBA BARDHAMAN Khandaghosh Burdwan Division BERUGRAM PIPED WATER SUPPLY SCHEME , SM/18606 New Continuation for the work of Supply of Inspection Vehicle for inspection of different JJM related (Schemes) works as and when required including supply of driver & fuel (minimum 8 Hours duty per day) and all taxes etc. for Durgapur Sub-Division under BurdwanDivision, P.H.E. Dte.consider 96.00 Km. run per day [Period AUG.'2024 to OCT.'2024] ORD/000845/2024-2025 575/DSD 19/07/2024 78 MD HASIN 1.00 0.00 0 0
4222 PURBA BARDHAMAN Khandaghosh Burdwan Division BERUGRAM PIPED WATER SUPPLY SCHEME , SM/18606 New Material Requisition To Resource Division RTOR000048/2024-2025 328/BWD 15/01/2025 Resource Division 3.20 0.00 0 0
4223 PURBA BARDHAMAN Khandaghosh Burdwan Division BERUGRAM PIPED WATER SUPPLY SCHEME , SM/18606 New Balance work of BERUGRAM & SULTANPUR Piped Water Supply Scheme with sinking of Tube-well, LDS, FHTC & construction of switch rooms & boundary walls with gates and land development, drain and internal pathway at different TW site under Khandaghosh Block, District:- Purba-Bardhaman. Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/001214/2024-2025 723/BWD 24/02/2025 180 MD HASIN 438.83 0.00 0 0
4224 PURBA BARDHAMAN Khandaghosh Burdwan Division BERUGRAM PIPED WATER SUPPLY SCHEME , SM/18606 New Continuation for the work of Supply of Inspection Vehicle for inspection of different JJM related (Schemes) works as and when required including supply of driver & fuel (minimum 8 Hours duty per day) and all taxes etc. for Durgapur Sub-Division under Burdwan Division, P.H.E. Dte.consider 96.00 Km. run per day. [PeriodFebruary.'2025 to April'2025] ORD/001180/2024-2025 129/DSD 29/01/2025 78 MD HASIN 1.00 0.00 0 0
4225 PURBA BARDHAMAN Khandaghosh Burdwan Division BERUGRAM PIPED WATER SUPPLY SCHEME , SM/18606 New Different works related (sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of different capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site) to BERUGRAM & SULTANPUR Piped Water Supply Scheme under Khandaghosh Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer ORD/000979/2023-2024 092/BWD 05/01/2024 604 SK ALIM 1,368.51 0.00 0 55
4226 PURBA BARDHAMAN Ausgram - II Burdwan Division BAHADURPUR PIPED WATER SUPPLY SCHEME , SM/13504 New Material Requisition To Resource Division RTOR000045/2023-2024 1962/BWD 25/04/2023 Resource Division 0.44 0.00 0 0
4227 PURBA BARDHAMAN Ausgram - II Burdwan Division BAHADURPUR PIPED WATER SUPPLY SCHEME , SM/13504 New Material Requisition To Resource Division RTOR000217/2023-2024 2155/BWD 10/05/2023 Resource Division 13.54 0.00 0 0
4228 PURBA BARDHAMAN Ausgram - II Burdwan Division BAHADURPUR PIPED WATER SUPPLY SCHEME , SM/13504 New Material Requisition To Resource Division RTOR000613/2023-2024 4916/BWD 10/11/2023 Resource Division 30.36 0.00 0 0
4229 PURBA BARDHAMAN Ausgram - II Central Mechanical BAHADURPUR PIPED WATER SUPPLY SCHEME , SM/13504 New New service connection for Bahadurpur PWSS BILL/02466/2023-2024 BP-2023-24-529 13/02/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.96 0.00 0 0
4230 PURBA BARDHAMAN Ausgram - II Central Mechanical BAHADURPUR PIPED WATER SUPPLY SCHEME , SM/13504 New NEW SERVICE CONNECTION FOR BAHADURPUR PWSS BILL/02471/2023-2024 BP-2023-24-533 13/02/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 7.83 0.00 0 0
4231 PURBA BARDHAMAN Ausgram - II Burdwan Division BAHADURPUR PIPED WATER SUPPLY SCHEME , SM/13504 New Continuation order for Supply of 01(one) No. Diesel Driven Motor Cab (Bharat Stage-II) on hire basis for the office of the Assistant Engineer, Durgapur Sub-Division (Burdwan North) P.H.E. Dte. Govt. of West Bengal (for the period of 01/01/2024 to 31/05/2024) Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer1, Durgapur Sub-Division, PHE Dte. ORD/001180/2023-2024 995/DSD 29/12/2023 183 SUJAUDDIN SEKH 2.00 0.00 0 60
4232 PURBA BARDHAMAN Ausgram - II Central Mechanical BAHADURPUR PIPED WATER SUPPLY SCHEME , SM/13504 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at Bahadurpur Water Supply Scheme [ Block- Ausgram-2 ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. Driller In-Charge JUNIOR ENGINEER ORD/000912/2023-2024 4176/CMD 29/08/2023 30 P.K. ENGINEERING 28.59 0.00 0 96
4233 PURBA BARDHAMAN Ausgram - II Central Mechanical BAHADURPUR PIPED WATER SUPPLY SCHEME , SM/13504 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Chora, Kalaijhuti & others water supply scheme under Ausgram-2 Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. Driller In-Charge JUNIOR ENGINEER ORD/000143/2024-2025 2405/CMD 02/08/2024 90 NABAUDYOG ELECTRICAL ENGINEERING CO-OPERATIVE SOCIETY LTD 95.26 0.00 0 0
4234 PURBA BARDHAMAN Ausgram - II Burdwan Division BAHADURPUR PIPED WATER SUPPLY SCHEME , SM/13504 New BAHADURPUR Piped Water Supply Scheme with sinking of Tube-well, LDS,Rising Main, FHTC & construction of switch rooms & boundary walls with gates and land development, drain and internal pathway at different TW site under Aushgram-II Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer ORD/000464/2023-2024 3455/BWD 08/08/2023 180 KOUSIK MALLICK 190.29 28.35 14.9 95
4235 PURBA BARDHAMAN Ausgram - II Durgapur W/S Division BAHADURPUR PIPED WATER SUPPLY SCHEME , SM/13504 New ACCEPTANCE CUM FORMAL WORK ORDER FOR Additional work for laying of Extension or Laying of parallel pipeline, Providing FHTC, Road Restoration work, Land development under Bahadurpur PWSS in Ausgram -II Block under Durgapur Water Supply Division, PHE Dte. Assistant Engineer-II Contractual Junior Engineer_5 ORD/000223/2024-2025 08/DWSD 02/01/2025 60 KOUSIK MALLICK 31.92 0.00 0 0
4236 PURBA BARDHAMAN Ausgram - II Durgapur W/S Division BAHADURPUR PIPED WATER SUPPLY SCHEME , SM/13504 New Material Requisition To Resource Division RTOR000051/2024-2025 471/DWSD 17/03/2025 Resource Division 0.14 0.00 0 0
4237 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Kashipur Piped Water Supply Scheme at Bhatar Block , SM/07868 Retrofitting Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Sripur village (Sripur Habitation) of Kashipur piped water supply scheme within Durgapur Sub-Division under Burdwan Division, PHE Dte.(Tr No.-718/BWD/2020-21) Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000613/2020-2021 1439/BWD 18/02/2021 15 ROY BISWAS CONSTRUCTION 4.50 4.50 100 1
4238 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Kashipur Piped Water Supply Scheme at Bhatar Block , SM/07868 Retrofitting Continuation work order for Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Nurpur village and Nurpur Habitation of KASHIPUR piped water supply scheme within Durgapur Sub-Division (Bardhaman North) under Burdwan Division, PHE Dte. [Phase-I] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000659/2020-2021 3971/BWD 14/10/2020 30 THREE MAA ENTERPRISE 1.21 0.00 0 1
4239 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Kashipur Piped Water Supply Scheme at Bhatar Block , SM/07868 Retrofitting Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of Kashipur Piped Water Supply Scheme at Sripur, (Sripur Habitation), Kashipur (Part) (Kashipur & Sahabganj Part Habitation) Village (Mouza), Bhatar Block under Burdwan Division, PHE Dte. Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000003/2021-2022 3118/BWD 02/06/2021 30 PREMANANDA ROY BISWAS 35.02 29.66 84.69 1
4240 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Kashipur Piped Water Supply Scheme at Bhatar Block , SM/07868 Retrofitting Extension of distribution main for providing FHTC at Kashipur Ramgere Adibasipara within Kashipur W/S Scheme in Bhatar Block under Burdwan Division, P.H.E. Dte. [Gr.-A] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000176/2021-2022 602/DSD 07/10/2021 30 THREE MAA ENTERPRISE 4.82 0.00 0 1
4241 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Kashipur Piped Water Supply Scheme at Bhatar Block , SM/07868 Retrofitting Extension of distribution main for providing FHTC at Kashipur Ramgere Adibasipara within Kashipur W/S Scheme in Bhatar Block under Burdwan Division, P.H.E. Dte. [Gr.-A] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000182/2021-2022 619/DSD 25/10/2021 30 THREE MAA ENTERPRISE 4.82 4.82 100 1
4242 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Kashipur Piped Water Supply Scheme at Bhatar Block , SM/07868 Retrofitting Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Kashipur (Part) village (Kashipur habitation) of Kashipur Piped Water Supply Scheme within Durgapur Sub-Divn. under Burdwan Division, PHE. Dte. [SL. No. : 18] [Agr. No. 720/BWD of 2020-2021] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000375/2020-2021 1441/BWD 18/02/2021 15 PREMANANDA ROY BISWAS 4.48 0.44 9.82 1
4243 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Kashipur Piped Water Supply Scheme at Bhatar Block , SM/07868 Retrofitting Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Kashipur (Part) village (Sahebganj (P) habitation) of Kashipur Piped Water Supply Scheme within Durgapur Sub-Divn. under Burdwan Division, PHE. Dte. [SL. No. : 16] [Agree Ment No.719/BWD of 2020-21] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000368/2020-2021 1440/BWD 18/02/2021 15 THREE MAA ENTERPRISE 4.52 0.45 9.96 1
4244 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Kashipur Piped Water Supply Scheme at Bhatar Block , SM/07868 Retrofitting Providing leftout water tap connection in different villages for 100% coverage to make it Sajal Gram from existing distribution system within scheme jurisdiction of different Piped Water Supply Schemes within Bhatar Block under Burdwan Division, PHE. Dte. Assistant Engineer ,Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000389/2021-2022 268/BWD 14/01/2022 30 BHARAT CONSTRUCTION 14.17 0.00 0 1
4245 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Kashipur Piped Water Supply Scheme at Bhatar Block , SM/07868 Retrofitting Restoration of damaged pipeline during construction of drain, concrete road etc and making valve chamber at various point at Kashipur village within Kashipur W/S Scheme in Bhatar Block under Burdwan Division, P.H.E. Dte. [SL-14] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer2, Durgapur Sub-Division, PHE Dte. ORD/000886/2022-2023 739/DSD 30/12/2022 21 PAPRI HAZRA 0.87 0.86 98.85 100
4246 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Kashipur Piped Water Supply Scheme at Bhatar Block , SM/07868 Retrofitting Continuation work order for Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Kashipur village in Sahebganj habitation of Kashipur piped water supply scheme within Durgapur (Bardhaman North) Sub-Division under Burdwan Division, PHE Dte. [Phase-I](Tr No.-361/BWD/2020-21) AE(HQs) J.E. 2 BURDWAN ORD/000266/2020-2021 3973/BWD 14/10/2020 30 PREMANANDA ROY BISWAS 4.84 1.20 24.79 0
4247 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Kashipur Piped Water Supply Scheme at Bhatar Block , SM/07868 Retrofitting Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Nurpur village and Nurpur habitation of Kashipur piped water supply scheme within Durgapur (Bardhaman North) Sub-Division under Burdwan Division, PHE Dte. [Phase-I](Tr No.-359/BWD/2020-21) Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer2, Durgapur Sub-Division, PHE Dte. ORD/000267/2020-2021 3340/BWD 18/09/2020 30 THREE MAA ENTERPRISE 4.84 1.20 24.79 0
4248 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Kashipur Piped Water Supply Scheme at Bhatar Block , SM/07868 Retrofitting Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Kashipur village and Sahebganj habitation of Kashipur piped water supply scheme within Durgapur (Bardhaman North) Sub-Division under Burdwan Division, PHE Dte. [Phase-I](Tr No.-360/BWD/2020-21) Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer ORD/000312/2020-2021 3339/BWD 18/09/2020 30 PREMANANDA ROY BISWAS 4.84 1.20 24.79 0
4249 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Kashipur Piped Water Supply Scheme at Bhatar Block , SM/07868 Retrofitting Relaying and restoration of damaged pipeline of distribution main for widening of PWD road and Bridge at Sahebganj Bazar for providing FHTC within Kashipur W/S Scheme in Bhatar Block under Burdwan Division, P.H.E. Dte. Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer2, Durgapur Sub-Division, PHE Dte. ORD/000564/2023-2024 653/DSD 24/08/2023 30 ANWESHA CONSTRUCTION 0.95 0.00 0 100
4250 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Kashipur Piped Water Supply Scheme at Bhatar Block , SM/07868 Retrofitting Restoration of damaged pipeline of distribution main for construction of drain, concrete road etc at various point at Majhipara village for providing FHTC within Kashipur W/S Scheme in Bhatar Block under Burdwan Division, P.H.E. Dte. Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer2, Durgapur Sub-Division, PHE Dte. ORD/000563/2023-2024 652/DSD 24/08/2023 30 ANWESHA CONSTRUCTION 0.96 0.00 0 100
4251 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Kashipur Piped Water Supply Scheme at Bhatar Block , SM/07868 Retrofitting Providing Functional Household Tap Connection (FHTC)from distribution system within the command area of Kashipur water supply scheme at Kashipur Nurpur and Sahebganj village to make its Swajalgram under JAL JIBAN MISSION within Bhatar Block in Purba Bardhanan District undrer Burdwan Division, P.H.E. Dte. Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer2, Durgapur Sub-Division, PHE Dte. ORD/000398/2024-2025 623/DSD 05/08/2024 90 RAM MOHAN MUKHERJEE 3.15 0.00 0 0
4252 PURBA BARDHAMAN Burdwan Division Rretrofitting wroks for Providing Functional Household Tap Connection (FHTC) within the commend area of Bhatar Piped Water Supply Scheme Block-Bhatar , SM/08033 Retrofitting Supply of materials for different water supply scheme under Burdwan Division, PHE Dte. VCH/001013/2021-2022 null 21/01/2022 EXECUTIVE ENGINEER, RESOURCES DIVISION, P.H.E. DTE. 617.98 0.00 0 0
4253 PURBA BARDHAMAN Burdwan Division Rretrofitting wroks for Providing Functional Household Tap Connection (FHTC) within the commend area of Bhatar Piped Water Supply Scheme Block-Bhatar , SM/08033 Retrofitting Payment for supply of materials for different water supply scheme under Burdwan Division, PHE Dte. VCH/001045/2021-2022 934/DW 31/01/2022 EXECUTIVE ENGINEER, RESOURCES DIVISION, P.H.E. DTE. 617.98 0.00 0 0
4254 PURBA BARDHAMAN Burdwan Division Rretrofitting wroks for Providing Functional Household Tap Connection (FHTC) within the commend area of Bhatar Piped Water Supply Scheme Block-Bhatar , SM/08033 Retrofitting Quotation of new connection charges for Bhatar (Zone-I) water supply scheme. P.H. No.-4 BILL/00132/2022-2023 942/JJM/22-23 09/01/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LTD. 3.67 0.00 0 0
4255 PURBA BARDHAMAN Burdwan Division Rretrofitting wroks for Providing Functional Household Tap Connection (FHTC) within the commend area of Bhatar Piped Water Supply Scheme Block-Bhatar , SM/08033 Retrofitting Sinking of additional 300 X 200mm dia Tube Well 200 mtr. Depth by D.R. Rig method using UPVC pipe (CD) and UPVC Deep Well Screen (RDS) at 1st & 2nd Tubewell Site for Augmentation of BHATAR (Zone-I) Piped Water Supply Scheme, Block - Bhatar, Dist - Purba Bardhaman under Burdwan Division, PHE Dte. [2 Nos. GTW]. Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000059/2022-2023 2240/BWD 02/05/2022 45 AUXILIARY TUBE WELL DRILLERS 28.54 20.72 72.6 1
4256 PURBA BARDHAMAN Burdwan Division Rretrofitting wroks for Providing Functional Household Tap Connection (FHTC) within the commend area of Bhatar Piped Water Supply Scheme Block-Bhatar , SM/08033 Retrofitting Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of Bhatar Piped Water Supply Scheme at Kapshar, Bamsor & Belenda (3nos) Village (Mouza) under Burwan Division, PHE Dte. Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000017/2021-2022 3301/BWD 15/06/2021 60 SUPER CO. OPERATIVE LABOUR CONTRACT AND CONSTRUCTION SOCIETY LTD. 141.14 137.29 97.27 1
4257 PURBA BARDHAMAN Burdwan Division Rretrofitting wroks for Providing Functional Household Tap Connection (FHTC) within the commend area of Bhatar Piped Water Supply Scheme Block-Bhatar , SM/08033 Retrofitting Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of Bhatar Piped Water Supply Scheme at Bhatar, Kantar, Kulchanda, Kulnagar, Palar, Satkhali & Chandipur (7nos) Village (Mouza) under Burwan Division, PHE Dte. Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000018/2021-2022 3300/BWD 15/06/2021 60 SUPER CO. OPERATIVE LABOUR CONTRACT AND CONSTRUCTION SOCIETY LTD. 143.17 127.59 89.12 1
4258 PURBA BARDHAMAN Burdwan Division Rretrofitting wroks for Providing Functional Household Tap Connection (FHTC) within the commend area of Bhatar Piped Water Supply Scheme Block-Bhatar , SM/08033 Retrofitting Retrofitting of RCC Elevated Reservoir (Capacity 300 cum) by shortcreting, Guniting etc. in connection with Augmentation of Bhatar w/s scheme (Zone-I) under Burdwan Division, PHE Dte. Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000963/2020-2021 1793./BWD 26/02/2021 45 LAGNAJITA & CO. 20.57 0.00 0 1
4259 PURBA BARDHAMAN Burdwan Division Rretrofitting wroks for Providing Functional Household Tap Connection (FHTC) within the commend area of Bhatar Piped Water Supply Scheme Block-Bhatar , SM/08033 Retrofitting Quotation of Bhatar water supply scheme, Zone-II, PHE Dte. [Quotation No.-5003600235/Quot/03, dt.-10/02/2023] BILL/00375/2022-2023 1168/JJM 10/03/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LTD. 3.37 0.00 0 0
4260 PURBA BARDHAMAN Burdwan Division Rretrofitting wroks for Providing Functional Household Tap Connection (FHTC) within the commend area of Bhatar Piped Water Supply Scheme Block-Bhatar , SM/08033 Retrofitting Extension of UPVC pipe line of LDS at Bhatar Alinagar for providing FHTC of Bhatar and its adjoining mouzas W/S Scheme (Zone-I) under Durgapur Sub-Division, Burdwan Division, P.H.E. Dte.[Gr.-G] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000292/2021-2022 721/DSD 17/12/2021 30 DHIRENDRANATH SOM 4.69 4.68 99.79 1
4261 PURBA BARDHAMAN Burdwan Division Rretrofitting wroks for Providing Functional Household Tap Connection (FHTC) within the commend area of Bhatar Piped Water Supply Scheme Block-Bhatar , SM/08033 Retrofitting Extension of UPVC pipe line of LDS at Vivekanandapally for providing FHTC of Bhatar and its adjoining mouzas W/S Scheme (Zone-I) under Durgapur Sub-Division, Burdwan Division, P.H.E. Dte. [Gr.-F] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000291/2021-2022 720/DSD 17/12/2021 30 DHIRENDRANATH SOM 2.24 2.21 98.66 1
4262 PURBA BARDHAMAN Burdwan Division Rretrofitting wroks for Providing Functional Household Tap Connection (FHTC) within the commend area of Bhatar Piped Water Supply Scheme Block-Bhatar , SM/08033 Retrofitting Extension of uPVC pipe line of LDS at Kalpukur Dakshin Para to Palar Lal para for providing FHTC of Bhatar and its adjoining mouzas W/S Scheme (Zone-II) under Durgapur Sub-Division, Burdwan Division, P.H.E. Dte. [Gr.-H] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000293/2021-2022 722/DSD 17/12/2021 30 DHIRENDRANATH SOM 1.99 1.99 100 1
4263 PURBA BARDHAMAN Burdwan Division Rretrofitting wroks for Providing Functional Household Tap Connection (FHTC) within the commend area of Bhatar Piped Water Supply Scheme Block-Bhatar , SM/08033 Retrofitting Extension of UPVC pipe line of LDS at Bhatar Maldanga road to Kalpukur Purbapar for providing FHTC of Bhatar and its adjoining mouzas W/S Scheme (Zone-II) under Durgapur Sub-Division, Burdwan Division, P.H.E. Dte. [Gr.-I] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000295/2021-2022 723/DSD 17/12/2021 30 DHIRENDRANATH SOM 4.26 3.70 86.85 1
4264 PURBA BARDHAMAN Central Drilling Rretrofitting wroks for Providing Functional Household Tap Connection (FHTC) within the commend area of Bhatar Piped Water Supply Scheme Block-Bhatar , SM/08033 Retrofitting Providing drilling crew and other allied works for construction of tube well (300mm x 200mm x 120 mtrs. depth) by utilising Departmental machineries for Bhatar W/S Scheme (Z-II) Bhatar block under Purba bardhaman district, CDD, PHE Dte. Driller In Charge Junior Engineer ORD/000002/2023-2024 64/CDD 06/04/2023 30 C.M. ENTERPRISE 9.91 8.31 83.85 0
4265 PURBA BARDHAMAN Burdwan Division Rretrofitting wroks for Providing Functional Household Tap Connection (FHTC) within the commend area of Bhatar Piped Water Supply Scheme Block-Bhatar , SM/08033 Retrofitting Providing Left-Out FHTC to Katari Habitation within Bhatar Zone-II PWSS, within Durgapur (Burdwan North) Sub-Division, PHE Dte, under Burdwan Division, PHE Dte. Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer ORD/000381/2023-2024 556/DSD 20/07/2023 30 BIPLAB SAMANTA 3.98 3.98 100 100
4266 PURBA BARDHAMAN Central Mechanical Rretrofitting wroks for Providing Functional Household Tap Connection (FHTC) within the commend area of Bhatar Piped Water Supply Scheme Block-Bhatar , SM/08033 Retrofitting Supply & Installation of Submersible Pumping Machinery , Voltage Stabilizer, Chlorination system and internal House wiring for Tube well no.- 4 at Augmentation of Bhatar (Zone - I) (Bamsor) Water Supply Scheme under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000934/2022-2023 1311/CMD 22/03/2023 30 SRI KRISHNA NIRMAN 11.88 10.93 92 99
4267 PURBA BARDHAMAN Burdwan Division Rretrofitting wroks for Providing Functional Household Tap Connection (FHTC) within the commend area of Bhatar Piped Water Supply Scheme Block-Bhatar , SM/08033 Retrofitting Quotation of new service connection charges of Aug. of Bhatar (Zone-II) TW-6 water supply scheme under Burdwan Division, PHE Dte. BILL/01338/2023-2024 1275/JJM 18/01/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LTD. 9.53 0.00 0 0
4268 PURBA BARDHAMAN Burdwan Division Rretrofitting wroks for Providing Functional Household Tap Connection (FHTC) within the commend area of Bhatar Piped Water Supply Scheme Block-Bhatar , SM/08033 Retrofitting Extension of UPVC pipe line of LDS at Kapshor village for providing FHTC of Bhatar and its adjoining mouzas W/S Scheme (Zone-I) under Durgapur Sub-Division, Burdwan Division, P.H.E. Dte. [SL-2] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer2, Durgapur Sub-Division, PHE Dte. ORD/000875/2022-2023 728/DSD 30/12/2022 21 DHIRENDRANATH SOM 0.95 0.00 0 100
4269 PURBA BARDHAMAN Burdwan Division Rretrofitting wroks for Providing Functional Household Tap Connection (FHTC) within the commend area of Bhatar Piped Water Supply Scheme Block-Bhatar , SM/08033 Retrofitting Extension of UPVC pipe line of LDS at Belenda Purbapara for providing FHTC of Bhatar and its adjoining mouzas W/S Scheme (Zone-II) under Durgapur Sub-Division, Burdwan Division, P.H.E. Dte. [SL-03] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer2, Durgapur Sub-Division, PHE Dte. ORD/000876/2022-2023 729/DSD 30/12/2022 21 DHIRENDRANATH SOM 0.95 0.00 0 100
4270 PURBA BARDHAMAN Burdwan Division Rretrofitting wroks for Providing Functional Household Tap Connection (FHTC) within the commend area of Bhatar Piped Water Supply Scheme Block-Bhatar , SM/08033 Retrofitting Extension of UPVC pipe line of LDS at Bamshor and Belenda Purbapara for providing FHTC of Bhatar and its adjoining mouzas W/S Scheme (Zone-II) under Durgapur Sub-Division, Burdwan Division, P.H.E. Dte. [SL-04] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer2, Durgapur Sub-Division, PHE Dte. ORD/000877/2022-2023 730/DSD 30/12/2022 21 DHIRENDRANATH SOM 0.96 0.96 100 100
4271 PURBA BARDHAMAN Burdwan Division Rretrofitting wroks for Providing Functional Household Tap Connection (FHTC) within the commend area of Bhatar Piped Water Supply Scheme Block-Bhatar , SM/08033 Retrofitting Extension of UPVC pipe line of LDS at Balsidanga village for providing FHTC of Bhatar and its adjoining mouzas W/S Scheme (Zone-I) under Durgapur Sub-Division, Burdwan Division, P.H.E. Dte. [SL-05] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer2, Durgapur Sub-Division, PHE Dte. ORD/000878/2022-2023 731/DSD 30/12/2022 21 DHIRENDRANATH SOM 0.89 0.00 0 100
4272 PURBA BARDHAMAN Burdwan Division Rretrofitting wroks for Providing Functional Household Tap Connection (FHTC) within the commend area of Bhatar Piped Water Supply Scheme Block-Bhatar , SM/08033 Retrofitting Providing Left-Out FHTC to Pallar Habitation within Bhatar Zone-I PWSS, within Durgapur (Burdwan North) Sub-Division, PHE Dte, under Burdwan Division, PHE Dte. Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer ,JUNIOR ENGINEER DURGAPUR SUB-DIVISION PHE DTE ORD/000380/2023-2024 555/DSD 20/07/2023 30 TARAMA AGENCY 4.22 0.00 0 100
4273 PURBA BARDHAMAN Burdwan Division Rretrofitting wroks for Providing Functional Household Tap Connection (FHTC) within the commend area of Bhatar Piped Water Supply Scheme Block-Bhatar , SM/08033 Retrofitting Sinking of 200 mm dia River Bank Tube Well 60 mtr. Depth by D.R. Rig method using UPVC pipe (CM) and UPVC Deep Well Screen (RMS) at Norja village Block -Bhatar, Dist - Purba Bardhaman under Durgapur Sub Division, PHE Dte. [Gr.-C] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000271/2022-2023 496/DSD 12/08/2022 21 DHIRENDRANATH SOM 4.35 0.00 0 100
4274 PURBA BARDHAMAN Burdwan Division Rretrofitting wroks for Providing Functional Household Tap Connection (FHTC) within the commend area of Bhatar Piped Water Supply Scheme Block-Bhatar , SM/08033 Retrofitting Laying of UPVC pipeline in Katari Habitation within Bhatar Zone- II PWSS WITHIN Durgapur (Burdwan North ) Sub Division ,PHE Dte, Under Burdwan Division PHE Dte. Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer ,JUNIOR ENGINEER DURGAPUR SUB-DIVISION PHE DTE ORD/001104/2023-2024 239/DSD 12/03/2024 30 BIPLAB SAMANTA 0.56 0.52 92.86 100
4275 PURBA BARDHAMAN Burdwan Division Rretrofitting wroks for Providing Functional Household Tap Connection (FHTC) within the commend area of Bhatar Piped Water Supply Scheme Block-Bhatar , SM/08033 Retrofitting Laying of UPVC pipeline in Pallar habitation (Palar Asram Para South side) with Bhatar Zone-I PWSS within Durgapur Sub- Division (Burdwan North) under Burdwan Division PHE Dte. Assistant Engineer, Durgapur Sub Division, P.H.E. Dte JUNIOR ENGINEER DURGAPUR SUB-DIVISION PHE DTE,Junior Engineer2, Durgapur Sub-Division, PHE Dte. ORD/000936/2023-2024 908/DSD 15/12/2023 45 TARAMA AGENCY 0.39 0.00 0 100
4276 PURBA BARDHAMAN Burdwan Division Rretrofitting wroks for Providing Functional Household Tap Connection (FHTC) within the commend area of Bhatar Piped Water Supply Scheme Block-Bhatar , SM/08033 Retrofitting Laying of UPVC pipeline in Pallar habitation (Palar Asram Para North side) with Bhatar Zone-I PWSS within Durgapur Sub- Division (Burdwan North) under Burdwan Division PHE Dte. Assistant Engineer, Durgapur Sub Division, P.H.E. Dte JUNIOR ENGINEER DURGAPUR SUB-DIVISION PHE DTE,Junior Engineer2, Durgapur Sub-Division, PHE Dte. ORD/000934/2023-2024 907/DSD 15/12/2023 45 PAPRI HAZRA 0.80 0.00 0 100
4277 PURBA BARDHAMAN Burdwan Division Rretrofitting wroks for Providing Functional Household Tap Connection (FHTC) within the commend area of Bhatar Piped Water Supply Scheme Block-Bhatar , SM/08033 Retrofitting Providing Left Out FHTC to Sansotosh Sayar Par within Bhatar Zone-II PWSS WITHIN Durgapur (Burdwan North ) Sub Division ,PHE Dte, Under Burdwan Division PHE Dte. Assistant Engineer, Durgapur Sub Division, P.H.E. Dte JUNIOR ENGINEER DURGAPUR SUB-DIVISION PHE DTE ORD/001105/2023-2024 240/DSD 12/03/2024 30 BIPLAB SAMANTA 0.94 0.00 0 100
4278 PURBA BARDHAMAN Burdwan Division Rretrofitting wroks for Providing Functional Household Tap Connection (FHTC) within the commend area of Bhatar Piped Water Supply Scheme Block-Bhatar , SM/08033 Retrofitting Providing Left Out FHTC to Area Adjacent to Railway Station within Bhatar Zone-II PWSS WITHIN Durgapur (Burdwan North ) Sub Division ,PHE Dte, Under Burdwan Division PHE Dte. Assistant Engineer, Durgapur Sub Division, P.H.E. Dte JUNIOR ENGINEER DURGAPUR SUB-DIVISION PHE DTE ORD/001106/2023-2024 241/DSD 12/03/2024 30 BIPLAB SAMANTA 0.95 0.00 0 100
4279 PURBA BARDHAMAN Burdwan Division Rretrofitting wroks for Providing Functional Household Tap Connection (FHTC) within the commend area of Bhatar Piped Water Supply Scheme Block-Bhatar , SM/08033 Retrofitting Digital structurization of pipeline alignment and asset evaluation including holistic design, preparation of design and drawings of overall LDS for Bhatar Piped Water Supply Scheme Zone I & Zone II under Bhatar Block. Assistant Engineer, Durgapur Sub Division, P.H.E. Dte JUNIOR ENGINEER DURGAPUR SUB-DIVISION PHE DTE ORD/000617/2024-2025 3350/BWD 11/09/2024 15 HORIZEN 5.23 2.61 49.9 100
4280 PURBA BARDHAMAN Burdwan Division Rretrofitting wroks for Providing Functional Household Tap Connection (FHTC) within the commend area of Bhatar Piped Water Supply Scheme Block-Bhatar , SM/08033 Retrofitting Quotation from WBSEDCL for load enhancement of Augmentation of Bhatar Zone-II (Kulnagar) w/s scheme for P.H.-6. BILL/00173/2024-2025 1036/JJM 25/10/2024 WBSEDCL 3.57 0.00 0 0
4281 PURBA BARDHAMAN Burdwan Division Rretrofitting wroks for Providing Functional Household Tap Connection (FHTC) within the commend area of Bhatar Piped Water Supply Scheme Block-Bhatar , SM/08033 Retrofitting Providing Left Out FHTC to Ashram Paschimpara within Bhatar Zone-I PWSS WITHIN Durgapur (Burdwan North ) Sub Division ,PHE Dte, Under Burdwan Division PHE Dte. Assistant Engineer, Durgapur Sub Division, P.H.E. Dte JUNIOR ENGINEER DURGAPUR SUB-DIVISION PHE DTE ORD/001165/2023-2024 270/DSD 15/03/2024 30 PAPRI HAZRA 0.92 0.77 83.7 100
4282 PURBA BARDHAMAN Burdwan Division Rretrofitting wroks for Providing Functional Household Tap Connection (FHTC) within the commend area of Bhatar Piped Water Supply Scheme Block-Bhatar , SM/08033 Retrofitting Laying of UPVC pipeline in Bardanga Adibasipara ,Vill-Satkhali within Bhatar Zone-II PWSS within Durgapur (Burdwan North ) Sub Division ,PHE Dte, Under Burdwan Division PHE Dte. JUNIOR ENGINEER DURGAPUR SUB-DIVISION PHE DTE ORD/000934/2024-2025 1074/DSD 10/12/2024 45 BIPLAB SAMANTA 2.53 0.00 0 0
4283 PURBA BARDHAMAN Burdwan Division Rretrofitting wroks for Providing Functional Household Tap Connection (FHTC) within the commend area of Bhatar Piped Water Supply Scheme Block-Bhatar , SM/08033 Retrofitting Laying of connecting pipeline in between Tube Well to pipeline at Bamsore village for Bhatar Zone 1 Pipe Water Supply scheme in Bhatar Block under Durgapur Sub-Division under Burdwan Division, P.H.E. Dte. Assistant Engineer, Durgapur Sub Division, P.H.E. Dte JUNIOR ENGINEER DURGAPUR SUB-DIVISION PHE DTE ORD/000933/2024-2025 1073/DSD 10/12/2024 30 TARAMA AGENCY 1.07 0.88 82.24 100
4284 PURBA BARDHAMAN Burdwan Division Rretrofitting wroks for Providing Functional Household Tap Connection (FHTC) within the commend area of Bhatar Piped Water Supply Scheme Block-Bhatar , SM/08033 Retrofitting Extension of UPVC pipe line of LDS near rail crossing at Balsidanga for providing FHTC of Bhatar and its adjoining mouzas W/S Scheme (Zone-II) under Durgapur Sub-Division, Burdwan Division, P.H.E. Dte. [SL-8] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer2, Durgapur Sub-Division, PHE Dte. ORD/000881/2022-2023 734/DSD 30/12/2022 21 DHIRENDRANATH SOM 0.96 0.00 0 100
4285 PURBA BARDHAMAN Burdwan Division Rretrofitting wroks for Providing Functional Household Tap Connection (FHTC) within the commend area of Bhatar Piped Water Supply Scheme Block-Bhatar , SM/08033 Retrofitting Supply of various D.I. Mechanical joints & specials for Aug. of BHATAR & Aug. of BALGONA Piped W/S. Scheme within Durgapur (Burdwan North) Sub-Division under Burdwan Division, PHE. Dte. [Part-B]. AE(HQs) JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000305/2024-2025 2828/BWD 19/07/2024 216 KEJRIWAL CASTINGS LIMITED 4.82 0.00 0 100
4286 PURBA BARDHAMAN Burdwan Division Rretrofitting wroks for Providing Functional Household Tap Connection (FHTC) within the commend area of Bhatar Piped Water Supply Scheme Block-Bhatar , SM/08033 Retrofitting Supply of various D.I. Mechanical joints & specials for Aug. of BHATAR & Aug. of BALGONA Piped W/S. Scheme within Durgapur (Burdwan North) Sub-Division under Burdwan Division, PHE. Dte. [Part-C]. AE(HQs) JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000309/2024-2025 2832/BWD 19/07/2024 225 JINDAL SAW LTD. 4.63 0.00 0 100
4287 PURBA BARDHAMAN Burdwan Division Rretrofitting wroks for Providing Functional Household Tap Connection (FHTC) within the commend area of Bhatar Piped Water Supply Scheme Block-Bhatar , SM/08033 Retrofitting Supply of various D.I. Mechanical joints & specials for Aug. of BHATAR & Aug. of BALGONA Piped W/S. Scheme within Durgapur (Burdwan North) Sub-Division under Burdwan Division, PHE. Dte. [Part-A]. AE(HQs) JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000316/2024-2025 2840/BWD 19/07/2024 215 ELECTROSTEEL CASTING LIMITED 4.95 0.00 0 100
4288 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting at Sultanpur PWSS , SM/06748 Retrofitting Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Sultanpur village of Sultanpur piped water supply scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. [Phase-I](Tr No.-373/BWD/2020-21) ORD/000084/2020-2021 2602/BWD 04/08/2020 30 INVENT ENGINEERS CO. OPERATIVE SOCIETY LTD. 4.91 4.91 100 1
4289 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting at Sultanpur PWSS , SM/06748 Retrofitting Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Gopalpur village of Sultanpur piped water supply scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. [Phase-I](Tr No.-338/BWD/2020-21) ORD/000087/2020-2021 2609/BWD 04/08/2020 30 BISWAS ENTERPRISE 4.91 4.91 100 1
4290 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting at Sultanpur PWSS , SM/06748 Retrofitting Continuation work order for Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Gopalpur village of Sultanpur piped water supply scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. [Phase-I](Tr No.-339/BWD/2020-21) AE(HQs) J.E. 2 BURDWAN ORD/000356/2020-2021 3700/BWD 05/10/2020 30 BISWAS ENTERPRISE 4.91 4.91 100 1
4291 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting at Sultanpur PWSS , SM/06748 Retrofitting Continuation work order for Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Sultanpur village of Sultanpur piped water supply scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. [Phase-I](Tr No.-374/BWD/2020-21) Assistant Engineer Junior Engineer, R.W.S. Burdwan Sub Division, P.H.E. Dt ORD/000116/2020-2021 3701/BWD 05/10/2020 30 INVENT ENGINEERS CO. OPERATIVE SOCIETY LTD. 4.19 4.19 100 1
4292 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting at Sultanpur PWSS , SM/06748 Retrofitting Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of Sultanpur Piped Water Supply Scheme at Halbele, Hridaypur, Isabpur, Nowapara & Uplati Village (Mouza), Kalna ¿ I Block under Burdwan Division, PHE Dte.(Agreement No. 56/2020-2021 OF SE/CC/PHE. DTE.) Assistant Engineer ORD/000124/2020-2021 4901/BWD 07/12/2020 90 MAJILA ENTERPRISE 94.67 78.45 82.87 1
4293 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting at Sultanpur PWSS , SM/06748 Retrofitting Supply of 10 mm NB Gun-metal Ferrule conforming to IS: 2692-1989 for Water tap connection in each house hold from existing distribution system within Scheme jurisdiction in different Piped Water Supply Scheme within Kalna Sub-Division under Burdwan Division, PHE. Dte. and delivered at Borsul Divl. Store. [Part-5]. AE(HQs) J.E. 2 BURDWAN ORD/000090/2021-2022 3590/BWD 13/07/2021 30 PREMANANDA ROY BISWAS 127.50 0.00 0 1
4294 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting at Sultanpur PWSS , SM/06748 Retrofitting Protection work of distribution system (200 mm dia) of 35 Mtr length near the head work site (Right Side) of Sultanpur & its adjoining mouzas water supply scheme by UC Bullah including Drum Sheet within Kalna Sub-Division under Burdwan Division, PHE Dte.[Gr.-E] Assistant Engineer ORD/000845/2020-2021 20/KSD 07/01/2021 30 DEBASHISH ENTERPRISE 0.75 0.00 0 1
4295 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting at Sultanpur PWSS , SM/06748 Retrofitting Providing FHTC in each household from dist. System within Scheme jurisdiction in Hridaypur, Upalati, Belerhat, Gopalpur, Sultanpur, Isabpur & Naopara Village of SULTANPUR W/S. Scheme under Burdwan Division, PHE Dte. Assistant Engineer ORD/000584/2021-2022 1357/BWD 09/03/2022 30 TAPAS KUMAR ROY 16.69 0.00 0 1
4296 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting at Deriapur PWSS , SM/06749 Retrofitting Continuation work order for Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Deriapur village of Deriapur piped water supply scheme within Headquarters under Burdwan Division, PHE Dte. [Phase-I](Tr No.-351/BWD/2020-21) Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000108/2020-2021 3898/BWD 12/10/2020 30 ASHOK KUMAR GHOSH 3.59 3.59 100 1
4297 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting at Deriapur PWSS , SM/06749 Retrofitting Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Deriapur village of Deriapur piped water supply scheme within Headquarters under Burdwan Division, PHE Dte. [Phase-I](Tr No.-158/BWD/2020-21) Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000086/2020-2021 2691/BWD 07/08/2020 30 ASHOK KUMAR GHOSH 4.92 4.92 100 1
4298 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting at Deriapur PWSS , SM/06749 Retrofitting Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of DERIAPUR Piped Water Supply Scheme at Astikur, Balagar & Bora Village (Mouza), Raina-I Block under Burdwan Division, PHE Dte.(Agreement No. 474/BWD OF 2020-2021) Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000129/2020-2021 4916/BWD 08/12/2020 90 ASHOK KUMAR GHOSH 39.84 32.07 80.5 1
4299 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting at Deriapur PWSS , SM/06749 Retrofitting Providing leftout water tap connection in different villages for 100% coverage to make it Sajal Gram from existing distribution system within scheme jurisdiction of different Piped Water Supply Schemes within Raina ¿ I Block under Burdwan Division, PHE. Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000344/2021-2022 39/BWD 05/01/2022 30 HAFIJUR RAHAMAN MIDYA 15.62 9.10 58.26 1
4300 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting at Deriapur PWSS , SM/06749 Retrofitting Conducting physical Household Survey at the IMIS reported village for HGJ certification and providing balance FHTC for Har Ghar Jal certification including conducting Gram Sabhas for different IMIS reported villages across the district under Burdwan Division, PHE Dte. AE(HQs),Assistant Engineer ,Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE.,Assistant Engineer, Durgapur Sub Division, P.H.E. Dte JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000428/2024-2025 3107/BWD 12/08/2024 90 TUBGRAM GRAMMYAK UNNAYAN SAMITY 309.60 0.00 0 50
4301 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting at Deriapur PWSS , SM/06749 Retrofitting Sinking of Tube Well, Construction of Pump House, Boundary Wall at 3rd TW Site with Extension of Pipeline & Laying Parallel line and Providing FHTC (Leftout] with allied works for DERIAPUR Piped Water Supply Scheme under Raina-I Block within Burdwan Sub Division under Burdwan Division P.H.E Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000177/2024-2025 2270/BWD 18/06/2024 317 ROY CONSTRUCTION 68.15 0.00 0 70
4302 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting at Anguna PWSS , SM/06752 Retrofitting Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Anguna village of Anguna Piped Water Supply Scheme within Headquarters under Burdwan Division, PHE. Dte. [Phase - I] [GROUP : ¿1A¿] ORD/000133/2020-2021 2694/BWD 10/07/2020 30 ANWESHA CONSTRUCTION 4.91 0.00 0 1
4303 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting at Anguna PWSS , SM/06752 Retrofitting Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Anguna village of Anguna Piped Water Supply Scheme within Headquarters under Burdwan Division, PHE. Dte. [Phase - I] [GROUP : ¿1A¿] (Agreement no. 171/BWD of 2020-21) ORD/000134/2020-2021 2698/BWD 07/08/2020 30 ANWESHA CONSTRUCTION 4.91 0.00 0 1
4304 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting at Anguna PWSS , SM/06752 Retrofitting Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Gunar village of Anguna piped water supply scheme within Headquarters under Burdwan Division, PHE Dte. [Phase-I](Tr No.-203/BWD/2020-21) ORD/000096/2020-2021 2693/BWD 07/08/2020 30 M/S ANAND CONSTRUCTION 4.92 4.92 100 1
4305 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting at Anguna PWSS , SM/06752 Retrofitting Continuation work order for Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Gunar village of Anguna piped water supply scheme within Headquarters under Burdwan Division, PHE Dte. [Phase-I](Tr No.-369/BWD/2020-21) Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000101/2020-2021 3515/BWD 25/09/2020 30 M/S ANAND CONSTRUCTION 2.17 2.17 100 1
4306 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting at Anguna PWSS , SM/06752 Retrofitting Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Anguna village of Anguna piped water supply scheme within Headquarters under Burdwan Division, PHE Dte. [Phase-I](Tr No.-171/BWD/2020-21) ORD/000097/2020-2021 2684/BWD 07/08/2020 30 ANWESHA CONSTRUCTION 4.91 4.91 100 1
4307 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting at Anguna PWSS , SM/06752 Retrofitting Continuation work order for Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Anguna village of Anguna piped water supply scheme within Headquarters under Burdwan Division, PHE Dte. [Phase-I](Tr No.-302/BWD/2020-21) Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000090/2020-2021 3355/BWD 21/09/2020 30 ANWESHA CONSTRUCTION 4.59 4.59 100 1
4308 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting at Anguna PWSS , SM/06752 Retrofitting Supply of materials for different water supply scheme under Burdwan Division, PHE Dte. VCH/001237/2021-2022 1132/DW 26/02/2022 EXECUTIVE ENGINEER, RESOURCES DIVISION, P.H.E. DTE. 221.00 0.00 0 0
4309 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting at Anguna PWSS , SM/06752 Retrofitting Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of Anguna Piped Water Supply Scheme at Anguna (Part), Gunar (Part) & Sakita Village (Mouza), Raina-I Block under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000291/2020-2021 517/BWD 21/01/2021 45 SK ALIM 33.40 27.37 81.95 1
4310 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting at Anguna PWSS , SM/06752 Retrofitting Extension of pipe line of existing distribution system within the command area of Anguna Piped Water Supply Scheme, Anguna village within Raina-1 Block of Burdwan Sub Division under Burdwan Division,PHE Dte".Gr.A. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000439/2022-2023 1465/BSD 25/08/2022 45 ANWESHA CONSTRUCTION 4.97 4.93 99.2 1
4311 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting at Anguna PWSS , SM/06752 Retrofitting Providing leftout water tap connection in different villages for 100% coverage to make it Sajal Gram from existing distribution system within scheme jurisdiction of different Piped Water Supply Schemes within Raina ¿ I Block under Burdwan Division, PHE. Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000344/2021-2022 39/BWD 05/01/2022 30 HAFIJUR RAHAMAN MIDYA 15.62 0.00 0 1
4312 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting at Anguna PWSS , SM/06752 Retrofitting Extension of pipeline of Anguna water supply scheme at Anguna, Sanktia and Gunar village within Raina-I Block under Burdwan division, PHE Dte.[Gr.-A] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000711/2021-2022 1480/BSD 09/11/2021 30 SK ABDUL HALIM 4.44 4.35 97.97 1
4313 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting at Anguna PWSS , SM/06752 Retrofitting Extension of pipeline for Anguna water supply scheme at Anguna, Sanktia and Gunar village within Raina-I Block under Burdwan Division, PHE Dte.[Gr.-B] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000715/2021-2022 1429/BSD 28/10/2021 30 SK ABDUL HALIM 4.38 3.11 71 1
4314 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting at Anguna PWSS , SM/06752 Retrofitting Hire & fuel charges of vehicle (Car No.-WB-41H-9788) for the office of the Assistant Engineer, Head Quarters, Burdwan Division, PHE Dte. for the month of March'23. BILL/00296/2023-2024 201/JJM 01/06/2023 SK. ASRAFUDDIN 0.39 0.00 0 0
4315 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting at Anguna PWSS , SM/06752 Retrofitting Vehicle bill for the office of the Assistant Engineer, Head Quarters Burdwan Division, PHE Dte. for the month of June'23. BILL/00616/2023-2024 482/JJM 09/08/2023 SK. ASRAFUDDIN 0.40 0.00 0 0
4316 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting at Anguna PWSS , SM/06752 Retrofitting Material Requisition To Resource Division RTOR000123/2021-2022 1108/BWD 26/02/2022 Resource Division 25.78 0.00 0 0
4317 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting at Anguna PWSS , SM/06752 Retrofitting Vehicle bill for the month of October & November'2023. BILL/01671/2023-2024 1145/JJM 29/12/2023 SOURAV JANA 0.79 0.00 0 0
4318 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting at Anguna PWSS , SM/06752 Retrofitting Vehicle bill for the month of november'2023. BILL/01672/2023-2024 1141/JJM 29/12/2023 SK.ASFIA 0.40 0.00 0 0
4319 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting at Anguna PWSS , SM/06752 Retrofitting Vehicle bill for the month of november'2023. BILL/01673/2023-2024 1140/JJM 29/12/2023 SK. ASRAFUDDIN 0.40 0.00 0 0
4320 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting at Anguna PWSS , SM/06752 Retrofitting Extension Pipeline with Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of Anguna, Sanktia, Gunar village of ANGUNA Piped Water Supply Scheme within Raina I Block of Burdwan Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000811/2022-2023 1575/BWD 31/03/2023 60 JAGADANANDAPUR CO. OP. LABOUR CONTRACT AND CONSTRUCTION SOCIETY LTD. 33.16 0.00 0 100
4321 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting at Anguna PWSS , SM/06752 Retrofitting MAINTENANCE OF ROAD (WHISH IS DAMAGED FOR LAYING PIPELINE BY PHE DEPTT) NAMELY NARUGRAM H.C TO BADSHI ROAD VIDE- PACKAGE NO- WB 22 12 UNDER PMGSY-III UNDER NARUGRAM GP. & RAINA-I BLOCK, IN PURBA BARDHAMAN DISTRICT BILL/00740/2024-2025 894/JJM 25/09/2024 EXECUTIVE ENGINEER (WBSRDA) PURBA BARDHAMAN DIVISION 3.86 0.00 0 null
4322 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of MAHESHDANGA Piped Water Supply Scheme at Memari-I Block , SM/07855 Retrofitting Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of Maheshdanga Piped Water Supply Scheme at Maheshdanga Village (5 Nos. habitations) & Kathalgachhi Village (3 Nos. habitations), Memari ¿ I Block under Burdwan Division, PHE Dte.(Agreement No. 722/BWD of 2020-2021) Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000324/2020-2021 1687/BWD 24/02/2021 60 PABITRA KUMAR SAMANTA 54.78 56.41 102.98 1
4323 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of MAHESHDANGA Piped Water Supply Scheme at Memari-I Block , SM/07855 Retrofitting Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of Maheshdanga Piped Water Supply Scheme at Salda Village (2 Nos. habitations) & Bahara Village (5 Nos. habitations), Jamalpur Block under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000156/2021-2022 4634/BWD 09/09/2021 60 CREATION CONSTRUCTION 52.73 52.53 99.62 1
4324 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of MAHESHDANGA Piped Water Supply Scheme at Memari-I Block , SM/07855 Retrofitting Supply of materials for different water supply schemes under Burdwan Division, PHE Dte. VCH/001555/2021-2022 1194/DW 10/03/2022 EXECUTIVE ENGINEER, RESOURCES DIVISION, P.H.E. DTE. 62.76 0.00 0 0
4325 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of MAHESHDANGA Piped Water Supply Scheme at Memari-I Block , SM/07855 Retrofitting Canal crossing of Mahesdanga water supply scheme(Node point 192 to 193) under Memari-I Block under Burdwan Division, PHE Dte.[Gr.-D] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000313/2021-2022 1158/BSD 31/08/2021 30 RANADHIR SINHA 4.85 0.00 0 1
4326 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of MAHESHDANGA Piped Water Supply Scheme at Memari-I Block , SM/07855 Retrofitting Construction of boundary wall (North side) including Front Gate at Pump house no - I Site of Maheshdanga Water Supply Scheme under Memari-I Dev. Block of Burdwan Division, PHE Dte. (Length -55.00 Mtr, Col-20 Nos). Gr.D. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000647/2021-2022 469/BSD 21/03/2022 45 SK ABDUL HALIM 4.37 0.00 0 1
4327 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of MAHESHDANGA Piped Water Supply Scheme at Memari-I Block , SM/07855 Retrofitting Laying of 200 mm dia HDPE distribution pipe line (Node No-402 To 401B) for Mahesdanga & ADJOINING MOUZAS WATER SUPPLY SCHEME at Memari-I Development Block under Burdwan Division, PHE Dte. Group : C Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000082/2022-2023 816/BSD 20/05/2022 30 M/S ASHA CONSTRUCTION 4.79 0.00 0 1
4328 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of MAHESHDANGA Piped Water Supply Scheme at Memari-I Block , SM/07855 Retrofitting Sinking of additional 250 X 200mm dia Tube Well 150 mtr. Depth by D.R. Rig method using UPVC pipe (CD) and UPVC Deep Well Screen (RDS) for MAHESHDANGA Piped Water Supply Scheme, Block - Memari - I, Dist - Purba Bardhaman under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000072/2022-2023 2472/BWD 12/05/2022 30 NADIA TUBEWELLS 10.32 0.00 0 1
4329 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of MAHESHDANGA Piped Water Supply Scheme at Memari-I Block , SM/07855 Retrofitting Earth work in excavation including shoring work of 700 cum capacity 20 Mtr staging height RCC Over Head Reservoir of Mahesdanga water supply scheme of Memari-I Block under Burdwan Division, PHE Dte.[Gr.-A] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000770/2021-2022 1365/BSD 05/10/2021 5 SK ALIM 4.73 0.00 0 1
4330 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of MAHESHDANGA Piped Water Supply Scheme at Memari-I Block , SM/07855 Retrofitting Laying of 200mm.dia. HDPE Distribution pipe line(Node No.401B to 401)for MAHESHDANGA & adjoining mouzas Water Supply Scheme at Memari-I Development block under Burdwan Division,PHE Dte. Group - D. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000091/2022-2023 831/BSD 23/05/2022 30 M/S ASHA CONSTRUCTION 4.49 0.00 0 1
4331 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of MAHESHDANGA Piped Water Supply Scheme at Memari-I Block , SM/07855 Retrofitting Earth filling and sand filling in excavated portion and land development at Head work site of 700 cum capacity 20 Mtr staging height RCC Over Head Reservoir of Mahesdanga water supply scheme of Memari-I Block under Burdwan Division, PHE Dte.[Gr.-A] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000773/2021-2022 1408/BSD 08/10/2021 5 M/S PROCHESTA ENTERPRISE 4.14 0.00 0 1
4332 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of MAHESHDANGA Piped Water Supply Scheme at Memari-I Block , SM/07855 Retrofitting Construction of boundary wall including land development at 2nd Tube Well site of MAHESHDANGA water supply scheme under Memari-I Block of Burdwan Division, PHE Dte. (Length -52.00 Mtr, Col-20 Nos). " Group : C. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000106/2022-2023 985/BSD 16/06/2022 45 MAA MAHAMAYA CONSTRUCTION 3.46 0.00 0 1
4333 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of MAHESHDANGA Piped Water Supply Scheme at Memari-I Block , SM/07855 Retrofitting Construction of boundary wall (SOUTH side) at Pump house no - I Site of Maheshdanga Water Supply Scheme under Memari-I Dev. Block of Burdwan Division, PHE Dte. (Length -58.00 Mtr, Col-21 Nos). Gr. G Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000475/2021-2022 280/BSD 15/02/2022 45 SK ABDUL HALIM 4.19 0.00 0 1
4334 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of MAHESHDANGA Piped Water Supply Scheme at Memari-I Block , SM/07855 Retrofitting Providing FHTC from dist. System within the command area of MAHESDANGA Piped Water Supply Scheme at Bahera (Part) and Mahesdanga (Part) Village (Mahesdanga, Aymadeulepara, Kamarpara & Jangalpara Habs.) at Memari-I Development Block under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000611/2021-2022 1571/BWD 16/03/2022 30 SUPRIYA RAY 22.42 22.40 99.91 1
4335 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of MAHESHDANGA Piped Water Supply Scheme at Memari-I Block , SM/07855 Retrofitting Providing FHTC from dist. System within the command area of MAHESDANGA Piped Water Supply Scheme at Deule Village, Salda Village, Bhara Village, Kathalgachi Village & Koleypara Village at Memari-I Development Block under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000613/2021-2022 1573/BWD 16/03/2022 60 SUPRIYA RAY 70.50 11.86 16.82 0
4336 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of MAHESHDANGA Piped Water Supply Scheme at Memari-I Block , SM/07855 Retrofitting Material Requisition To Resource Division RTOR000020/2021-2022 421/BWD 20/01/2022 Resource Division 5.49 0.00 0 0
4337 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of MAHESHDANGA Piped Water Supply Scheme at Memari-I Block , SM/07855 Retrofitting Construction of 168 Mtr long P.C.C Approach road from Main Road to OHR site and inside boundary of OHR Site of MAHESHDANGA PWSS under Memari-I Development Block under Burdwan Division PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000530/2023-2024 3627/BWD 21/08/2023 30 MANAS BHATTACHARYA 5.95 5.30 89.08 100
4338 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of MAHESHDANGA Piped Water Supply Scheme at Memari-I Block , SM/07855 Retrofitting Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of Maheshdanga Piped Water Supply Scheme at Deule Village (4 Nos. habitations), Memari ¿ I Block under Burdwan Division, PHE Dte. AE(HQs) J.E. 2 BURDWAN ORD/000638/2020-2021 1796/A/BWD 26/02/2021 45 INVENT ENGINEERS CO. OPERATIVE SOCIETY LTD. 27.66 27.65 99.96 0
4339 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of MAHESHDANGA Piped Water Supply Scheme at Memari-I Block , SM/07855 Retrofitting Replacement of fully damaged PVC water supply line at Dulepara along National Highway for MAHESDANGA and its adj.mouza W/S Scheme,Block:Memari-I within Burdwan Sub-Division,PHE Dte Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. Junior Engineer, RWS, Memari-I Dev. Bolck ORD/000870/2023-2024 2746/BSD 28/11/2023 30 SUPRIYA RAY 0.96 0.00 0 100
4340 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) under the command area of Dharma Danga Piped Water Supply Scheme , SM/07545 Retrofitting Continuation order for water tap connection in each house hold from existing distribution system within scheme jurisdiction in Rameswarpur village and Rameswarpur habitation of Dharmadanga piped water supply scheme within Kalna Sub-Division under Burdwan Division, PHE Dte.[Phase-I][Group-1B] Assistant Engineer ORD/000732/2020-2021 4743/BWD 01/12/2020 30 TAPAS KUMAR ROY 3.20 0.00 0 1
4341 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) under the command area of Dharma Danga Piped Water Supply Scheme , SM/07545 Retrofitting Water tap connection in each household from existing distribution system within scheme jurisdiction in Koldanga-Mirpur village (35 Nos) & Rameswarpur village (50 Nos) (Total-85 Nos) of Dharmadanga water supply scheme within Kalna Sub-Division under Burdwan Division, PHE Dte.[SL NO.-C] Assistant Engineer ORD/000321/2021-2022 1026/KSD 01/10/2021 15 SETH ENTERPRISE 2.95 2.95 100 1
4342 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) under the command area of Dharma Danga Piped Water Supply Scheme , SM/07545 Retrofitting Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of Dharmadanga Piped Water Supply Scheme at Dharmadanga (P) Village (Mouza), Kalna-I Block under Burdwan Division, PHE Dte. Assistant Engineer ORD/000255/2021-2022 6641/BWD 29/11/2021 30 INVENT ENGINEERS CO. OPERATIVE SOCIETY LTD. 14.94 15.39 103.01 1
4343 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) under the command area of Dharma Danga Piped Water Supply Scheme , SM/07545 Retrofitting Continuation work order for Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Madhuban village of Dharmadanga Piped Water Supply Scheme within Kalna Sub-Divn. under Burdwan Division, PHE. Dte. [Phase - I] [Sl.No : 6B] Assistant Engineer ORD/000972/2020-2021 4745/BWD 01/12/2020 30 KHEPIMA ENGINEERS CO. OPERATIVE SOCIETY LTD. 2.66 2.66 100 1
4344 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) under the command area of Dharma Danga Piped Water Supply Scheme , SM/07545 Retrofitting Extension of different dia UPVC pipeline at Rameswarpur village of Dharmadanga water supply scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. [Sl No.-A] Assistant Engineer ORD/000829/2020-2021 167/KSD 19/02/2021 30 BISHWAJIT DAS 3.97 0.00 0 1
4345 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) under the command area of Dharma Danga Piped Water Supply Scheme , SM/07545 Retrofitting Hire & fuel charges of vehicle (Car No.-WB-04G-6018) for the office of the Assistant Engineer, Katwa Sub-Division, PHE Dte. for the month of March'23. BILL/00290/2023-2024 204/JJM 01/06/2023 M/S MUNMUN DEY 0.28 0.00 0 0
4346 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) under the command area of Dharma Danga Piped Water Supply Scheme , SM/07545 Retrofitting Work order for "Providing Functional house hold tap connections for Sajal Gram Village within Kalna-I Block under Kalna Sub-Division under Burdwan Division, PHE Dte. (Dharmadanga Water Supply Scheme) Sl No- 5 Assistant Engineer Junior Engineer, R.W.S. Burdwan Sub Division, P.H.E. Dt ORD/000689/2022-2023 101/KSD 08/02/2023 30 BUILD-TECH 0.88 0.88 100 100
4347 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) under the command area of Dharma Danga Piped Water Supply Scheme , SM/07545 Retrofitting Designing, Making and Erection of Sign Board for SAJAL GRAM in Rameswarpur (P) Village, Kalna - I Block within Dharma Danga PWSS under Burdwan Division, PHE Dte. (5 Nos Board) AE(HQs) J.E. 1 BURDWAN ORD/000741/2023-2024 836/AE/HQ 31/10/2023 30 MUNSHI JAVEDUR JAMAN 0.76 0.00 0 100
4348 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) under the command area of Dharma Danga Piped Water Supply Scheme , SM/07545 Retrofitting Designing, Making and Erection of Sign Board for SAJAL GRAM in Madhuban (P) Village, Kalna - I Block within Dharma Danga PWSS under Burdwan Division, PHE Dte. (5 Nos Board) AE(HQs) J.E. 1 BURDWAN ORD/000794/2023-2024 873/AE/HQ 07/11/2023 30 PAPRI HAZRA 0.76 0.00 0 100
4349 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) under the command area of Dharma Danga Piped Water Supply Scheme , SM/07545 Retrofitting Rest portion of OHR work (Plastering, Priming & Painting and interconnection of Rising Main with Specials) & Construction of Boundary wall with Smriti Saudha at Aug. of DHARMADANGA Water Supply Scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. (Length - 81.01 Mtr, No of Columns=28 Nos. Centre to Centre- 3.0 Mtr.). Assistant Engineer Junior Engineer, R.W.S. Burdwan Sub Division, P.H.E. Dt ORD/000995/2023-2024 267/BWD 15/01/2024 60 S.K. CONSTRUCTION 27.45 0.00 0 100
4350 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) under the command area of Dharma Danga Piped Water Supply Scheme , SM/07545 Retrofitting Work Order for "Providing Functional house hold tap connections within command ares of Dharmadanga water supply scheme within Kalna-I Block under Kalna Sub-Division under Burdwan Division, PHE Dte." Assistant Engineer Junior Engineer, R.W.S. Burdwan Sub Division, P.H.E. Dt ORD/000550/2023-2024 1305/KSD 23/08/2023 15 BISWAS ENTERPRISE 2.81 0.00 0 100
4351 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) under the command area of Dharma Danga Piped Water Supply Scheme , SM/07545 Retrofitting Work Order for "Laying distribution system including providing FHTC in the leftout portion of Dharmadanga (SM/07545) water supply scheme under Kalna Sub-Division under Burdwan Division, PHE Dte.". Assistant Engineer Junior Engineer, R.W.S. Burdwan Sub Division, P.H.E. Dt ORD/000953/2024-2025 1921/KSD 02/12/2024 30 H SAMANTA 2.02 0.00 0 0
4352 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) under the command area of Dharma Danga Piped Water Supply Scheme , SM/07545 Retrofitting Work Order for 'Laying distribution system including providing FHTC in the left out portion of Dharmadanga piped water supply scheme under Kalna Sub-Division under Burdwan Division, PHE Dte.'. Assistant Engineer Junior Engineer, R.W.S. Burdwan Sub Division, P.H.E. Dt ORD/000806/2024-2025 1770/KSD 20/11/2024 30 BISWAS ENTERPRISE 1.67 1.37 82.04 100
4353 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) under the command area of Bamangaria Piped Water Supply Scheme , SM/07556 Retrofitting Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Banki village and Banki Habitation of Bamangaria piped water supply scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. [Phase-I] Assistant Engineer ORD/000606/2020-2021 4123/BWD 16/10/2020 30 GOUTAM KUMAR MITRA 4.86 4.86 100 1
4354 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) under the command area of Bamangaria Piped Water Supply Scheme , SM/07556 Retrofitting Continuation work order for Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Banki village and Banki habitation of Bamungoria Piped Water Supply Scheme within Kalna Sub-Divn. under Burdwan Division, PHE. Dte. [Phase - I] [GROUP : ¿10B¿] Assistant Engineer ORD/000137/2021-2022 4543/BWD 06/09/2021 30 GOUTAM KUMAR MITRA 0.97 0.97 100 1
4355 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) under the command area of Bamangaria Piped Water Supply Scheme , SM/07556 Retrofitting Continuation work order for Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Bamangaria village and Bamungoria habitation of Bamungoria Piped Water Supply Scheme within Kalna Sub-Divn. under Burdwan Division, PHE. Dte. [Phase - I] [GROUP : ¿10A¿] Assistant Engineer ORD/000920/2020-2021 151/BWD 08/01/2021 30 PAL CONSTRUCTION 1.73 1.73 100 1
4356 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) under the command area of Bamangaria Piped Water Supply Scheme , SM/07556 Retrofitting Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Bamangaria village and Bamangaria habitation of Bamangaria piped water supply scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. [Phase-I](Tr No.-536/BWD/2020-21) Assistant Engineer ORD/000169/2020-2021 4122/BWD 16/10/2020 30 PAL CONSTRUCTION 4.86 4.86 100 1
4357 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) under the command area of Bamangaria Piped Water Supply Scheme , SM/07556 Retrofitting Hire & fuel charges of vehicle (Car No.-WB-04G-7127) for the office of the Assistant Engineer, Kalna Sub-Division, PHE Dte. for the month of March to September'2022. BILL/00145/2022-2023 866/VEH 09/12/2022 PARTHA PRATIM ACHARYA 2.79 0.00 0 0
4358 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) under the command area of Bamangaria Piped Water Supply Scheme , SM/07556 Retrofitting Hire & fuel charges of vehicle (Car No.-04G-7127) for the office of the Assistant Engineer, Kalna Sub-Division, PHE Dte. for the month of October & November'2022. BILL/00288/2022-2023 956/JJM/22-23 13/01/2023 PARTHA PRATIM ACHARYA 0.77 0.00 0 0
4359 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) under the command area of Bamangaria Piped Water Supply Scheme , SM/07556 Retrofitting Extension of different dia UPVC pipeline to provide house connections to the different leftout areas in the command area of Bamungaria W/S Scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. (Sl No-B) Assistant Engineer ORD/000392/2021-2022 07/KSD Dt-04.01.2022 04/01/2022 30 PAL CONSTRUCTION 2.52 1.61 63.89 1
4360 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) under the command area of Bamangaria Piped Water Supply Scheme , SM/07556 Retrofitting Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Bhaturia village (Bhaturia habitation) of Bamungoria Piped Water Supply Scheme within Kalna Sub-Divn. under Burdwan Division, PHE. Dte. (Part-A). [SL. No. : 22] AE(HQs) J.E. 2 BURDWAN ORD/000467/2020-2021 1461/BWD 18/02/2021 15 ABDUL HAI 4.86 4.86 100 0
4361 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) under the command area of Bamangaria Piped Water Supply Scheme , SM/07556 Retrofitting Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Bhaturia village (Bhaturia habitation) of Bamungoria Piped Water Supply Scheme within Kalna Sub-Divn. under Burdwan Division, PHE. Dte. (Part-B). [SL. No. : 23] AE(HQs) J.E. 2 BURDWAN ORD/000530/2020-2021 1460/BWD 18/02/2021 15 SANTANU BHATTACHARYAY 4.86 4.86 100 0
4362 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) under the command area of Bamangaria Piped Water Supply Scheme , SM/07556 Retrofitting Digital structurization of pipeline alignment and asset evaluation including holistic design, preparation of design drawings of overall LDS & preparation of estimate for 14 Nos. Piped W/S. Schemes under Purbasthali I Block under Kalna Sub-Division under Burdwan Division, PHE. Dte. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000337/2024-2025 3017/BWD 05/08/2024 75 HORIZEN 38.00 6.76 17.79 100
4363 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) under the command area of Bamangaria Piped Water Supply Scheme , SM/07556 Retrofitting Different Types of work involved in connection with Augmentation of SONARUDRA (SM/16349) & KACHUA (SM/13497) Piped Water Supply Scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000192/2024-2025 2430/BWD 27/06/2024 480 R.G. INFRASTRUCTURE 240.70 0.00 0 2
4364 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Lohai Piped Water Supply Scheme at Raina-II Block , SM/07779 Retrofitting Continuation work order for Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Natungram village and Natungram, Daspara, Palpara habitation of Lohana piped water supply scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. [Phase-I](Tr No.-475/BWD/2020-21) Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000370/2020-2021 4781/BWD 02/12/2020 30 PARTHA PRATIM ACHARYA 2.95 0.00 0 1
4365 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Lohai Piped Water Supply Scheme at Raina-II Block , SM/07779 Retrofitting Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of LOHAI Piped Water Supply Scheme at Madhabdihi, Bhanjanpur, Akhina & Dakhin Gopalpur Village (Mouza), Raina-II Block under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000157/2021-2022 4635/BWD 09/09/2021 60 CREATION CONSTRUCTION 61.85 25.75 41.63 1
4366 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Lohai Piped Water Supply Scheme at Raina-II Block , SM/07779 Retrofitting Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of Lohai Piped Water Supply Scheme at Arui, Dighra, Jotragob, Konerpur & Lohai Village (Mouza), Raina-II Block under Burdwan Division, PHE Dte. [Agreement No. 54/2020-2021 OF SE/CC/PHE. DTE.] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000419/2020-2021 4888/BWD 07/12/2020 90 M/S S. CHOUDHURY 75.66 31.29 41.36 1
4367 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Lohai Piped Water Supply Scheme at Raina-II Block , SM/07779 Retrofitting Plinth protection and uplift of inner side of base floor of OHR and construction of sluice valve chamber at LOHAI PWSS at Raina-II Block under Burdwan Division PHE Dte. [Group : B] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000359/2022-2023 446/AE/HQ 16/08/2022 30 INDIAN ENGINEERS CO.-OPERATIVE SOCIETY LTD. 1.91 1.82 95.29 1
4368 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Lohai Piped Water Supply Scheme at Raina-II Block , SM/07779 Retrofitting Continuation work order for Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Barakalmi & Sirajpur village of Lohana Piped Water Supply Scheme within Kalna Sub-Divn. under Burdwan Division, PHE. Dte. [SL. No. : 22] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000195/2021-2022 6188/BWD 28/10/2021 15 PARTHA PRATIM ACHARYA 4.86 0.00 0 1
4369 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Lohai Piped Water Supply Scheme at Raina-II Block , SM/07779 Retrofitting Laying of uPVC pipe for providing FHTC in different habitation of Lohai, Akhina and Dakshin Gopalpur Mouza within Lohai Piped Water Supply Scheme, Raina-II Block under Burdwan Division P.H.E DTE. [Group: ¿E¿] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000221/2021-2022 1816/AE/HQ 21/09/2021 30 M/S S. CHOUDHURY 4.76 4.68 98.32 1
4370 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Lohai Piped Water Supply Scheme at Raina-II Block , SM/07779 Retrofitting Laying of uPVC pipe for providing FHTC at Madhabdihi, Lohai and Akhina Village within LOHAI Piped Water Supply Scheme, Raina-II Block under Burdwan Division P.H.E Dte._Gr-E Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000668/2021-2022 137/AE/HQ 15/03/2022 20 M/S S. CHOUDHURY 4.80 4.80 100 1
4371 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Lohai Piped Water Supply Scheme at Raina-II Block , SM/07779 Retrofitting Laying of uPVC pipe for providing FHTC at Bhanjapur, Alampur and Akhina Village within Lohai Piped Water Supply Scheme, Raina-II Block under Burdwan Division P.H.E Dte.Gr. E Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000630/2021-2022 127/AE/HQ 04/03/2022 15 M/S S. CHOUDHURY 4.79 4.48 93.53 1
4372 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Lohai Piped Water Supply Scheme at Raina-II Block , SM/07779 Retrofitting Laying of dedicated HDPE pipeline for supply of sufficient water at Bhanjapur village of Lohai piped water supply scheme, Raina-II Block under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000575/2021-2022 6741/BWD 03/12/2021 30 THREE MAA ENTERPRISE 20.11 0.00 0 1
4373 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Lohai Piped Water Supply Scheme at Raina-II Block , SM/07779 Retrofitting Extension of pipeline for providing functional house hold tap connection at Bhanjapur Mouza within Lohai water supply scheme under Burdwan Division, PHE Dte.[Gr.-D] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000969/2020-2021 1259/AE/HQ 15/02/2021 30 M/S S. CHOUDHURY 4.14 3.26 78.74 1
4374 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Lohai Piped Water Supply Scheme at Raina-II Block , SM/07779 Retrofitting MAINTENANCE OF ROAD (WHISH IS DAMAGED FOR LAYING PIPELINE BY PHE DEPTT) NAMELY NARUGRAM H.C TO BADSHI ROAD VIDE- PACKAGE NO- WB 22 12 UNDER PMGSY-III UNDER NARUGRAM GP. & RAINA-I BLOCK, IN PURBA BARDHAMAN DISTRICT BILL/00740/2024-2025 894/JJM 25/09/2024 EXECUTIVE ENGINEER (WBSRDA) PURBA BARDHAMAN DIVISION 3.86 0.00 0 null
4375 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Lohai Piped Water Supply Scheme at Raina-II Block , SM/07779 Retrofitting Conducting physical Household Survey at the IMIS reported village for HGJ certification and providing balance FHTC for Har Ghar Jal certification including conducting Gram Sabhas for different IMIS reported villages across the district under Burdwan Division, PHE Dte. AE(HQs),Assistant Engineer ,Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE.,Assistant Engineer, Durgapur Sub Division, P.H.E. Dte JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000428/2024-2025 3107/BWD 12/08/2024 90 TUBGRAM GRAMMYAK UNNAYAN SAMITY 309.60 0.00 0 50
4376 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Lohai Piped Water Supply Scheme at Raina-II Block , SM/07779 Retrofitting Balance Work for extension of pipe lines to provide FHTC with Sinking of Tubwell, Construction of pump house with Boundary wall & other related work for LOHAI PWSS under Burdwan Sub-Div., Block -Raina-II, under Burdwan Division PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/001014/2024-2025 61/BWD 06/01/2025 120 B.S. ENTERPRISE 62.48 0.00 0 0
4377 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Lohai Piped Water Supply Scheme at Raina-II Block , SM/07779 Retrofitting Special maintenance for FHTC work of LOHAI Piped Water Supply Scheme within Raina-II block under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/001178/2024-2025 262/BSD 05/02/2025 15 RAJESH DAFADAR 0.71 0.00 0 0
4378 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Eruar Piped Water Supply Scheme at Bhatar Block , SM/07780 Retrofitting Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of ERUAR Piped Water Supply Scheme at Eruar (Part-A) (Eruar (Part-A) Habitation) village (Mouza), Bhatar Block under Burdwan Division, PHE Dte. (Agreement no. 569/BWD of 2020-2021) Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000290/2020-2021 356/BWD 15/01/2021 30 HAFIJUR RAHAMAN MIDYA 19.95 6.07 30.43 1
4379 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Eruar Piped Water Supply Scheme at Bhatar Block , SM/07780 Retrofitting Providing Functional Household Tap connection (FHTC) from existing distribution system within the command area of ERUAR piped water supply scheme at Muratipur (Part) (Muratipur Part Habitation) village (Mouza) within Bhatar Block under Burdwan Division, PHE Dte._2nd Call. Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000765/2020-2021 1266/BWD 11/02/2021 30 S.N. ENTERPRISE 18.71 4.37 23.36 1
4380 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Eruar Piped Water Supply Scheme at Bhatar Block , SM/07780 Retrofitting Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of ERUAR Piped Water Supply Scheme at Eruar (Part-D) (Eruar (Part-D) Habitation) village (Mouza), Bhatar Block under Burdwan Division, PHE Dte. ._2ND CALL (Agreement No.703/BWD of 2020-2021) Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000296/2020-2021 1569/15/BWD 22/02/2021 30 DUBE ENTERPRISE 18.61 15.99 85.92 1
4381 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Eruar Piped Water Supply Scheme at Bhatar Block , SM/07780 Retrofitting Providing Functional Household Tap Connection (FHTC) & Restoration of pipeline at Sixteen Nos. samsad of Eruar Gram Panchayat from ERUAR Piped Water Supply Scheme at Bhatar Block under Burdwan Division, PHE Dte. Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000296/2021-2022 7033/BWD 17/12/2021 60 IJABUL SEKH 92.08 76.47 83.05 1
4382 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Eruar Piped Water Supply Scheme at Bhatar Block , SM/07780 Retrofitting Hire & fuel charges of vehicle (Car No.-WB-41D-4561) for the office of the Assistant Engineer, Durgapur Sub-Division, PHE Dte. for the month of September & October'2022. BILL/00142/2022-2023 823/VEH 02/12/2022 SUJAUDDIN SEKH 0.73 0.00 0 0
4383 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Eruar Piped Water Supply Scheme at Bhatar Block , SM/07780 Retrofitting Hire & fuel charges of vehicle (Car No.-WB-37C-8293) for the office of the Assistant Engineer, Durgapur Sub-Division, PHE Dte. for the month of November'2022. BILL/00286/2022-2023 954/JJM/22-23 13/01/2023 SUJAUDDIN SEKH 0.38 0.00 0 0
4384 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Eruar Piped Water Supply Scheme at Bhatar Block , SM/07780 Retrofitting Extension of pipeline at "Sansad No. 10, 11 and 24" of Eruar and its adjoining mouza's Piped W/S Scheme at Bhatar Block within Durgapur (Bardhaman North) Sub Division under Burdwan Division, P.H.E. Dte. [Gr.-N] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000173/2021-2022 607/DSD 07/10/2021 30 DUBE ENTERPRISE 3.15 2.30 73.02 1
4385 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Eruar Piped Water Supply Scheme at Bhatar Block , SM/07780 Retrofitting Providing Left-Out FHTC to Eruar Habitation within ERUAR PWSS, within Durgapur (Burdwan North) Sub-Division, PHE Dte, under Burdwan Division, PHE Dte. Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer2, Durgapur Sub-Division, PHE Dte. ORD/000382/2023-2024 557/DSD 20/07/2023 30 SANDIPAN SENGUPTA 4.44 0.00 0 0
4386 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Eruar Piped Water Supply Scheme at Bhatar Block , SM/07780 Retrofitting Providing Functional House hold Tap connection (FHTC) from existing distribution system within the command area of ERUAR piped water supply scheme at Erusr (Part-C) (Eruar Part-C Habitation) village (Mouza) within Bhatar Block under Burdwan Division, PHE Dte. Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000763/2020-2021 1265 /BWD 11/02/2021 30 S.T. ENTERPRISE 18.05 17.67 97.89 1
4387 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Eruar Piped Water Supply Scheme at Bhatar Block , SM/07780 Retrofitting Providing Functional Household tap connection (FHTC) from existing distribution system within the command area of ERUAR piped water supply scheme at Eruar (Part-B) (Eruar (Part-B) Habitation) village (Mouza), Bhatar Block under Burdwan Division, PHE Dte. [Tr No.-678/BWD/20-21] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000386/2020-2021 1264/BWD 11/02/2021 30 S.T. ENTERPRISE 22.24 0.82 3.69 100
4388 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Eruar Piped Water Supply Scheme at Bhatar Block , SM/07780 Retrofitting Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Muratipur village and Muratipur habitation of ERUAR Piped Water Supply Scheme within Durgapur (Burdwan North) Sub-Divn. under Burdwan Division, PHE. Dte. [Phase - I] [GROUP : ¿11B¿] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer ORD/000457/2020-2021 4748/BWD 01/12/2020 30 S. MONDAL 4.86 4.86 100 0
4389 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Eruar Piped Water Supply Scheme at Bhatar Block , SM/07780 Retrofitting Laying of pipeline for ERUAR Piped Water Supply Scheme in Bhatar Block under Burdwan Division, PHE. Dte. Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000443/2024-2025 3079/BWD 09/08/2024 90 SOUMYAVASH DAS 5.01 0.00 0 0
4390 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Eruar Piped Water Supply Scheme at Bhatar Block , SM/07780 Retrofitting Replacing of existing damaged pipe line at KALUTAK and repairing of 4th Pump house and changing of 2 nos. valve at ERUAR village of ERAUR PWSS of Bhatar Block within Durgapur (Burdwan North) Sub- Division under Burdwan Division PHE Dte. Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer ,JUNIOR ENGINEER DURGAPUR SUB-DIVISION PHE DTE ORD/000937/2023-2024 909/DSD 15/12/2023 45 SWAPAN KUMAR ROY 0.93 0.00 0 100
4391 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Eruar Piped Water Supply Scheme at Bhatar Block , SM/07780 Retrofitting Construction of 1.5 mtrs. Height Boundary Wall along with 750 mm Height 3 layer barbed wire around Other than head work site(ERRUAR4 TH Pump House),Kaluttak under ERUAR PWSS, Bhatar Dev. Block, within Durgapur (Burdwan North) Sub-Division under Burdwan Division, P.H.E. DTE. JUNIOR ENGINEER DURGAPUR SUB-DIVISION PHE DTE ORD/000936/2024-2025 1082/DSD 11/12/2024 60 SWAPAN KUMAR ROY 3.72 0.00 0 0
4392 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Eruar Piped Water Supply Scheme at Bhatar Block , SM/07780 Retrofitting Replacing of existing damaged pipe line at Nareshpara and changing of 4 nos valve near OHR and Kaluttak Village of Eraur PWSS under Bhatar Development Block within Durgapur Sub Division under Burdwan Division PHE Dte. Assistant Engineer, Durgapur Sub Division, P.H.E. Dte JUNIOR ENGINEER DURGAPUR SUB-DIVISION PHE DTE ORD/000395/2024-2025 620/DSD 05/08/2024 30 SWAPAN KUMAR ROY 2.17 1.53 70.51 100
4393 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Jay Krishnapur Piped Water Supply Scheme at Galsi-II Block , SM/07781 Retrofitting Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of Joykrishnapur Piped Water Supply Scheme at Joykrishnapur (4 Nos Habitation), Pilgram & Taranagar (2 Nos Habitation) Village (Mouza), Galsi-II Block under Burdwan Divn., PHE Dte.[Agreement No. 609/BWD OF 2020-2021] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000380/2020-2021 752/BWD 29/01/2021 45 SUDHAMAY MAJUMDAR 43.97 43.29 98.45 1
4394 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Jay Krishnapur Piped Water Supply Scheme at Galsi-II Block , SM/07781 Retrofitting Sinking of 200mm dia River bank Tube Well 60 mtr. Depth by D.R. Rig method using UPVC pipe (CM) and UPVC Deep Well Screen (RMS) at Taranagar village under Joykrishnapur water supply scheme,Block -Galsi-II, Dist - Purba Bardhaman under Durgapur Sub Division, PHE Dte. [Gr.-A] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000330/2022-2023 533/DSD 22/08/2022 21 ANIRUDDHA FARUQUE 4.35 0.00 0 1
4395 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Jay Krishnapur Piped Water Supply Scheme at Galsi-II Block , SM/07781 Retrofitting Sinking of 200mm dia River bank Tube Well 60 mtr. Depth by D.R. Rig method using UPVC pipe (CM) and UPVC Deep Well Screen (RMS) at Simuliya village under Joykrishnapur water supply scheme,Block -Galsi-II, Dist - Purba Bardhaman under Durgapur Sub Division, PHE Dte. [Gr.-B] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000331/2022-2023 534/DSD 22/08/2022 21 SANDIPAN SENGUPTA 4.35 4.36 100.23 1
4396 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Jay Krishnapur Piped Water Supply Scheme at Galsi-II Block , SM/07781 Retrofitting Laying of parallel line with 90 mm dia uPVC pipe within Node 86-88 and providing air valve for improvement of water supply to FHTC at Pilgram village within Jaykrishnapur and its adjoining mouzas W/S Scheme under Durgapur Sub-Division, Burdwan Division, P.H.E. Dte. [Gr.-I) Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000464/2021-2022 81/DSD 11/02/2022 30 TARAMA AGENCY 3.12 3.02 96.79 1
4397 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Jay Krishnapur Piped Water Supply Scheme at Galsi-II Block , SM/07781 Retrofitting Restoration of damaged pipeline of distribution main for construction of drain, concrete road etc. at various point at Jaykrishnapur, Taranagar and Pilgram village for providing FHTC within Jaykrishnapur W/S Scheme in Galsi-II Block under Burdwan Division, P.H.E. Dte.[SL-A] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000622/2021-2022 162/DSD 16/03/2022 30 SUDHAMAY MAJUMDAR 4.81 4.78 99.38 1
4398 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Jay Krishnapur Piped Water Supply Scheme at Galsi-II Block , SM/07781 Retrofitting Hire & fuel charges of vehicle (Car No.-WB-37C-8293) for the office of the Assistant Engineer, Durgapur Sub-Division, PHE Dte. for the month of April'23. BILL/00293/2023-2024 203/JJM 01/06/2023 SUJAUDDIN SEKH 0.40 0.00 0 0
4399 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Jay Krishnapur Piped Water Supply Scheme at Galsi-II Block , SM/07781 Retrofitting Making Connection with 90 mm dia uPVC pipe within Node 162-168 for improvement of water supply to FHTC at Taranagar village within Jaykrishnapur and its adjoining mouzas W/S Scheme under Durgapur Sub-Division, Burdwan Division, P.H.E. Dte. [SL-24] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000866/2022-2023 722/DSD 30/12/2022 30 TARAMA AGENCY 2.07 1.98 95.65 100
4400 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Jay Krishnapur Piped Water Supply Scheme at Galsi-II Block , SM/07781 Retrofitting Vehicle bill for the month of September & October'2023. BILL/01676/2023-2024 961/JJM 01/12/2023 SUJAUDDIN SEKH 0.65 0.00 0 0
4401 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting at Purba Sahapur PWSS , SM/06768 Retrofitting Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Purba Sahapur (Pt-B) village of Purba Sahapur Piped Water Supply Scheme within Kalna Sub-Divn. under Burdwan Division, PHE. Dte. [Phase - I] [Sl.No : 7B] Assistant Engineer ORD/000131/2020-2021 2584/BWD 09/07/2020 30 SETH ENTERPRISE 4.92 0.00 0 1
4402 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting at Purba Sahapur PWSS , SM/06768 Retrofitting Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Purba Sahapur (Pt-A) village of Purba Sahapur Piped Water Supply Scheme within Kalna Sub-Divn. under Burdwan Division, PHE. Dte. [Phase - I] [Sl.No : 7A] Assistant Engineer ORD/000132/2020-2021 2585/BWD 09/07/2020 30 YOUNG ENGINEERS CO.-OPERATIVE SOCIETY LTD. 4.92 0.00 0 1
4403 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting at Purba Sahapur PWSS , SM/06768 Retrofitting Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Purba Sahapur (Pt-B) village of Purba Sahapur Piped Water Supply Scheme within Kalna Sub-Divn. under Burdwan Division, PHE. Dte. [Phase - I] [Sl.No : 7B] Assistant Engineer ORD/000738/2020-2021 2587/BWD 04/08/2020 30 SETH ENTERPRISE 4.92 4.92 100 1
4404 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting at Purba Sahapur PWSS , SM/06768 Retrofitting Continuation work order for supply of 10 mm NB Gun-Metal /Brass Ferrul conforming to IS:2692-1989 for water tap connection in each household from existing distribution system within scheme jurisdiction in different piped water supply scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. and delivered at Barsul Divisional Store.[Part-6] Assistant Engineer ORD/000867/2020-2021 4318/BWD 04/11/2020 10 MD HASIN 4.93 0.00 0 1
4405 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting at Purba Sahapur PWSS , SM/06768 Retrofitting Extension of pipeline at Purbasahapur mouza under Purbasahapur water supply scheme within Kalna Sub-Division under Burdwan Division, PHE Dte.[Sl-A] Assistant Engineer ORD/000930/2020-2021 29/KSD 11/01/2021 45 YOUNG ENGINEERS CO.-OPERATIVE SOCIETY LTD. 4.84 4.73 97.73 1
4406 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting at Purba Sahapur PWSS , SM/06768 Retrofitting Continuation work order for Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Sahapur (Pt-A) village of Sahapur Piped Water Supply Scheme within Katwa Sub-Divn. under Burdwan Division, PHE. Dte. [Phase - I] [SL.No : ¿11A¿] (Agreement no.-501/BWD of 2020-21) Assistant Engineer ORD/000145/2020-2021 4083/BWD 16/10/2020 30 RAINBOW CONSTRUCTION 2.23 2.23 100 1
4407 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting at Purba Sahapur PWSS , SM/06768 Retrofitting Continuation work order for Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Sahapur (Part-B) village of Sahapur piped water supply scheme within Katwa Sub-Division under Burdwan Division, PHE Dte. [Phase-I](Tr No.-497/BWD/2020-21) Assistant Engineer JUNIOR ENGINEER KATWA SUB-DIVISION PHE DTE ORD/000547/2020-2021 4007/BWD 14/10/2020 30 DUBE ENTERPRISE 2.84 2.84 100 0
4408 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting at Purba Sahapur PWSS , SM/06768 Retrofitting Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Sahapur, Char Sahapur and Natungram village of Sahapur piped water supply scheme within Katwa Sub-Division under Burdwan Division, PHE Dte. (Tr No.-789/BWD/2020-21) Assistant Engineer JUNIOR ENGINEER KATWA SUB-DIVISION PHE DTE ORD/000517/2020-2021 365/KTS 15/12/2020 7 DUBE ENTERPRISE 2.46 2.46 100 0
4409 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting at Purba Sahapur PWSS , SM/06768 Retrofitting Digital structurization of pipeline alignment and asset evaluation including holistic design, preparation of design drawings of overall LDS & preparation of estimate for 03 Nos. Piped W/S. Schemes under Kalna II Block under Kalna Sub-Division under Burdwan Division, PHE. Dte. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000336/2024-2025 3016/BWD 05/08/2024 20 HORIZEN 7.55 1.26 16.69 100
4410 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Ghosh Piped Water Supply Scheme , SM/07821 Retrofitting Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of GHOSH Piped Water Supply Scheme at Andur & Bahapur village (Mouza), Memari ¿ I Block under Burdwan Division, PHE Dte.(Agreement No. 577/BWD of 2020-2021) Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000328/2020-2021 437/BWD 24/02/2021 30 MAJILA ENTERPRISE 22.76 0.00 0 1
4411 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Ghosh Piped Water Supply Scheme , SM/07821 Retrofitting Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of Ghosh Piped Water Supply Scheme at Mondaljana Part (Bajamondaljana, Kashirampur & Mondaljana Habitation), Horirampur & Ghosh Part Village (Mouza) Memari-I Block under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000102/2021-2022 3781/BWD 22/07/2021 30 KAUSHIK RAY 20.09 20.09 100 1
4412 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Ghosh Piped Water Supply Scheme , SM/07821 Retrofitting Providing FHTC from dist. System within the command area of GHOSH Piped Water Supply Scheme at Kashirampur, Joyampur, Sajina, Ichapur, Purba-Gantar, Andur, Bahabpur & Ghosh (Part) village (Mouza) at Memari-I Development Block under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. Junior Engineer, RWS, Memari-I Dev. Bolck ORD/000338/2021-2022 25/BWD 04/01/2022 30 MAJILA ENTERPRISE 36.17 36.79 101.71 1
4413 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Ghosh Piped Water Supply Scheme , SM/07821 Retrofitting Providing leftout water tap connection in different villages for 100% coverage to make it Sajal Gram from existing distribution system within scheme jurisdiction of different Piped Water Supply Schemes within Memari-I Block (Daluibazar-II, Gopegantar-I & II G.P.) under Burdwan Division, PHE. Dte. Dte._Part-A. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000371/2021-2022 209/BWD 11/01/2022 30 M/S ANAND CONSTRUCTION 21.11 0.00 0 1
4414 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Ghosh Piped Water Supply Scheme , SM/07821 Retrofitting Extension of pipeline for GHOSH Piped Water Supply Scheme at Mondaljone (6 Nos), Kashirampur (8 Nos),Total 14 Nos FHTC Work for Sajal Gram(As per Field verification report for Har Ghar Jal Certification within Memari-I Block including leftout household water connection (FHTC) under Burdwan Division,PHE Dte. Gr.A. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000333/2022-2023 1350/BSD 02/08/2022 5 MAJILA ENTERPRISE 0.97 0.97 100 1
4415 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Ghosh Piped Water Supply Scheme , SM/07821 Retrofitting Extension of pipeline for GHOSH Piped Water Supply Scheme at Mondaljona [6 No's], Kashirampur [8 No's],Total 14 No's FHTC Work for Sajal Gram (As per Field Verification Report for Har Ghar Jal Certification within Memari-I Block including leftout husehold water tap connection(FHTC) under Burdwan Division, PHE Dte. ORD/000644/2022-2023 1350-A/BSD 02/08/2022 5 MAJILA ENTERPRISE 0.97 0.00 0 0
4416 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Ghosh Piped Water Supply Scheme , SM/07821 Retrofitting Conducting physical Household Survey at the IMIS reported village for HGJ certification and providing balance FHTC for Har Ghar Jal certification including conducting Gram Sabhas for different IMIS reported villages across the district under Burdwan Division, PHE Dte. AE(HQs),Assistant Engineer ,Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE.,Assistant Engineer, Durgapur Sub Division, P.H.E. Dte JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000428/2024-2025 3107/BWD 12/08/2024 90 TUBGRAM GRAMMYAK UNNAYAN SAMITY 309.60 0.00 0 50
4417 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Ghosh Piped Water Supply Scheme , SM/07821 Retrofitting Re-Laying of damaged pipeline on distribution system for FHTC work for GHOSH Piped Water Supply Scheme at JOY RAMPUR mouza within MEMARI - I BLOCK under Burdwan Division, PHE Dte. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/001070/2024-2025 104/BSD 16/01/2025 30 N.S. ENTERPRISE 4.81 0.00 0 0
4418 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Tehata Piped Water Supply Scheme at Kalna-II Block , SM/07812 Retrofitting Continuation work order for Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Tehata (Part) village Tehata (Part) habitation of Tehata piped water supply scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. [SL NO.-05] Assistant Engineer ORD/000689/2020-2021 1223/BWD 11/02/2021 15 ROY & ROY CONSTRUCTION 3.16 3.16 100 1
4419 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Tehata Piped Water Supply Scheme at Kalna-II Block , SM/07812 Retrofitting Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Bajitpur village, Bajit habitation & Jhikra village (Jhikra habitation) of Tehata piped water supply scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. [SL NO.-02] Assistant Engineer ORD/000692/2020-2021 52/BWD 05/01/2021 15 YOUNG ENGINEERS CO.-OPERATIVE SOCIETY LTD. 4.86 4.86 100 1
4420 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Tehata Piped Water Supply Scheme at Kalna-II Block , SM/07812 Retrofitting Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Tehata (Part) village, Tehata (Part) habitation of Tehata piped water supply scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. [SL NO.-05] Assistant Engineer ORD/000690/2020-2021 55/BWD 05/01/2021 15 ROY & ROY CONSTRUCTION 4.86 4.86 100 1
4421 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Tehata Piped Water Supply Scheme at Kalna-II Block , SM/07812 Retrofitting Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Tehata (Part) village (Bajitpur & Sarpukur habitation) of Tehata piped water supply scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. [SL NO.-06] Assistant Engineer ORD/000693/2020-2021 56/BWD 05/01/2021 15 M/S UNIQUE 4.86 4.86 100 1
4422 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Tehata Piped Water Supply Scheme at Kalna-II Block , SM/07812 Retrofitting Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Baitipara village (Baitipara Habitation) of Tehata piped water supply scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. [Sl No.-01] Assistant Engineer ORD/000709/2020-2021 51/BWD 05/01/2021 15 SUKANTA DEY 4.87 0.00 0 1
4423 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Tehata Piped Water Supply Scheme at Kalna-II Block , SM/07812 Retrofitting Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Kutubpur (Part) village (Kutub Habitation) & Suipara village (Suipara Habitation) of Tehata piped water supply scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. [Sl No.-04] Assistant Engineer ORD/000723/2020-2021 54/BWD 05/01/2021 15 INVENT ENGINEERS CO. OPERATIVE SOCIETY LTD. 4.84 4.84 100 1
4424 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Tehata Piped Water Supply Scheme at Kalna-II Block , SM/07812 Retrofitting Continuation work order for Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Baitipara village (Baitipara habitation) of Tehata Piped Water Supply Scheme within Kalna Sub-Divn. under Burdwan Division, PHE. Dte. [Sl. No. : ¿01¿] Assistant Engineer ORD/000123/2021-2022 4020/BWD 05/08/2021 15 SUKANTA DEY 3.23 3.23 100 1
4425 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Tehata Piped Water Supply Scheme at Kalna-II Block , SM/07812 Retrofitting Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of Tehata Piped Water Supply Scheme at Bajitpur (P), Jhiekra (P), Habibpur (P), Narenga Kutubpur (P) & Saipara (P) Village (Mouza), Kalna-II Block under Burdwan Division, PHE Dte. Assistant Engineer ORD/000254/2021-2022 6640/BWD 29/11/2021 30 INVENT ENGINEERS CO. OPERATIVE SOCIETY LTD. 26.96 24.45 90.69 1
4426 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Tehata Piped Water Supply Scheme at Kalna-II Block , SM/07812 Retrofitting Work order for " Providing Functional house hold tap connections for Sajal Gram Village within Kalna-II Block under Kalna Sub-Division under Burdwan Division, PHE Dte. (Tehata Water Supply Scheme)" Assistant Engineer JUNIOR ENGINEER R.W.S. BURDWAN SUB-DIVISION PHE DTE ORD/000037/2023-2024 345/KSD 17/04/2023 30 ARINDAM BHATTACHARYA 0.88 0.88 100 100
4427 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Tehata Piped Water Supply Scheme at Kalna-II Block , SM/07812 Retrofitting Hire & fuel charges of vehicle Car No.-WB-04G-7127 for the month of July & August'2023. BILL/01047/2023-2024 767/JJM 12/10/2023 PARTHA PRATIM ACHARYA 0.78 0.00 0 0
4428 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Tehata Piped Water Supply Scheme at Kalna-II Block , SM/07812 Retrofitting Providing FHTC work at Agradaha village (25 Nos), Jhikra village (20 Nos), Kutubpur village (122 Nos) Habibpur village (232 Nos) & Bajitpur village (16 Nos) under Tehata Zone-II Water Supply Scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. ORD/000884/2023-2024 5515/BWD 14/12/2023 30 YOUNG ENGINEERS CO.-OPERATIVE SOCIETY LTD. 23.96 0.00 0 0
4429 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Tehata Piped Water Supply Scheme at Kalna-II Block , SM/07812 Retrofitting Providing FHTC work at Suipara village (13 Nos), Tehata village (52 Nos), Bajitpur village (18 Nos) Narenga village (282 nos) & Baitipara village (52 Nos) under TEHATA Zone-I Water Supply Scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. ORD/000883/2023-2024 5516/BWD 14/12/2023 30 YOUNG ENGINEERS CO.-OPERATIVE SOCIETY LTD. 19.32 0.00 0 0
4430 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Tehata Piped Water Supply Scheme at Kalna-II Block , SM/07812 Retrofitting Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Kutubpur (Part) village (Habibpur Habitation) of Tehata piped water supply scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. [SL NO.-03] AE(HQs) J.E. 2 BURDWAN ORD/000713/2020-2021 53/BWD 05/01/2021 15 TAPAS KUMAR ROY 4.86 4.86 100 0
4431 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Tehata Piped Water Supply Scheme at Kalna-II Block , SM/07812 Retrofitting Vehicle bill for the month of August & September'2023. BILL/01675/2023-2024 1139/JJM 29/12/2023 MD HASIN 0.77 0.00 0 0
4432 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Tehata Piped Water Supply Scheme at Kalna-II Block , SM/07812 Retrofitting Vehicle bill [car No.-WB-04G-7127] for the month of October & November'2023. BILL/02061/2023-2024 1321/JJM 01/02/2024 PARTHA PRATIM ACHARYA 0.73 0.00 0 0
4433 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Tehata Piped Water Supply Scheme at Kalna-II Block , SM/07812 Retrofitting Different types of works involve in connection with Augmentation of TEHATA Zone-I & II (SM/16301) Water Supply Scheme, CHAKSIMLA (SM/15586) Water Supply Scheme & DWARIATON (SM/16285) Water Supply Scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer JUNIOR ENGINEER RWS KALNA2 ORD/000162/2024-2025 2201/BWD 13/06/2024 222 M/S ASHA CONSTRUCTION 449.98 0.00 0 25
4434 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap connection (FHTC) by retrofitting within the command area of AJHAPUR Piped Water Supply Scheme at Jamalpur Block under Burdwan Division, P.H.E. DTE. , SM/08701 Retrofitting Supply of materials for different water supply schemes under Burdwan Division, PHE Dte. VCH/001555/2021-2022 1194/DW 10/03/2022 EXECUTIVE ENGINEER, RESOURCES DIVISION, P.H.E. DTE. 62.76 0.00 0 0
4435 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap connection (FHTC) by retrofitting within the command area of AJHAPUR Piped Water Supply Scheme at Jamalpur Block under Burdwan Division, P.H.E. DTE. , SM/08701 Retrofitting Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of AJHAPUR Piped Water Supply Scheme and its adjoining mouzas (Vill- Ajhapur, Habitation- Purba Sadipur, Musunda) at Jamalpur Block of Burdwan Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000578/2021-2022 1352/BWD 09/03/2022 45 SUSUNIA GP CO. OPERATIVE LABOUR CONTRACT AND CONSTRUCTION SOCIETY LTD. 41.37 38.97 94.2 1
4436 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap connection (FHTC) by retrofitting within the command area of AJHAPUR Piped Water Supply Scheme at Jamalpur Block under Burdwan Division, P.H.E. DTE. , SM/08701 Retrofitting Providing Functional House Hold Tap Connection (FHTC) at Ajhapur village (Habitation,near Head Work Site)under AJHAPUR PWSS at Jamalpur Dev. Block of Burdwan Sub-Division under Burdwan Division,PHE Dte. Gr.D. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000442/2022-2023 1480/BSD 25/08/2022 30 T.K. BANERJEE & CO. 3.33 3.33 100 1
4437 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap connection (FHTC) by retrofitting within the command area of AJHAPUR Piped Water Supply Scheme at Jamalpur Block under Burdwan Division, P.H.E. DTE. , SM/08701 Retrofitting Providing Functional Household Tap Connection(FHTC)from existing distribution pipe line system within command area of AJHAPUR Piped W/S Scheme at Ajhapur Habitation (Near Head Works Site), Jamalpur Development Block under Burdwan Division,PHE Dte. Gr.E. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000478/2022-2023 1602/BSD 14/09/2022 30 DEY NIRMAN 4.03 3.92 97.27 1
4438 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap connection (FHTC) by retrofitting within the command area of AJHAPUR Piped Water Supply Scheme at Jamalpur Block under Burdwan Division, P.H.E. DTE. , SM/08701 Retrofitting Extension of pipeline of AJHAPUR Piped Water Supply scheme of Jamalpur Block under Burdwan Sub-Division,under Burdwan Division,PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000581/2022-2023 1978/BSD 17/11/2022 15 DEY NIRMAN 0.51 0.51 100 1
4439 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap connection (FHTC) by retrofitting within the command area of AJHAPUR Piped Water Supply Scheme at Jamalpur Block under Burdwan Division, P.H.E. DTE. , SM/08701 Retrofitting Sinking of 300 X 200mm dia Tube Well 150 mtr. Depth by D.R. Rig method using UPVC pipe (CM) and UPVC Medium Well Screen (RMS) of AJHAPUR & its adjoining mouzas Piped Water Supply Scheme, Block - Jamalpur, Dist - Purba Bardhaman under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000545/2022-2023 5124/BWD 21/11/2022 30 SUSUNIA GP CO. OPERATIVE LABOUR CONTRACT AND CONSTRUCTION SOCIETY LTD. 11.24 9.77 86.92 1
4440 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap connection (FHTC) by retrofitting within the command area of AJHAPUR Piped Water Supply Scheme at Jamalpur Block under Burdwan Division, P.H.E. DTE. , SM/08701 Retrofitting Material Requisition To Resource Division RTOR000024/2021-2022 422/BWD 20/01/2022 Resource Division 5.49 0.00 0 0
4441 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap connection (FHTC) by retrofitting within the command area of AJHAPUR Piped Water Supply Scheme at Jamalpur Block under Burdwan Division, P.H.E. DTE. , SM/08701 Retrofitting Construction of Pump House cum chlorine room without sanitary and water supply arrangement at Tube Well Site to departmental drawing no-PHE/BD/P.H/DRG/02/DEC-17(Size 3.60 mtr x 3.00 mtr room) for AJHAPUR its Adjoining Mouza W/S Scheme, Block -Jamalpur within Burdwan Sub-Division, PHE Dte. (Mouza- SALMULA) Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. RWS_JAMALPUR ORD/000841/2022-2023 507/BSD 21/03/2023 45 M/S MA TARA ENTERPRISE 3.29 1.39 42.25 100
4442 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap connection (FHTC) by retrofitting within the command area of AJHAPUR Piped Water Supply Scheme at Jamalpur Block under Burdwan Division, P.H.E. DTE. , SM/08701 Retrofitting Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of AJHAPUR Piped Water Supply Scheme at Jamalpur Block under Burdwan Division, PHE Dte. (Agreement No. 46/2020-2021 OF SE/CC/PHE. DTE.) Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. Junior Engineer, R.W.S. Burdwan Sub Division, P.H.E. Dt ORD/000452/2020-2021 4753/BWD 01/12/2020 90 SK ALIM 93.16 22.74 24.41 0
4443 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap connection (FHTC) by retrofitting within the command area of AJHAPUR Piped Water Supply Scheme at Jamalpur Block under Burdwan Division, P.H.E. DTE. , SM/08701 Retrofitting Construction of Boundary wall at 4th Tubewell site with Inter Connection and providing FHTC at Mirepara, Adampur, Shalmula Village (Habitation) of AJHAPUR Water Supply Scheme under JAMALPUR Block of Burdwan Division, PHE Dte. AE(HQs) Junior Engineer, Burdwan Division ORD/001040/2023-2024 783/BWD 27/02/2024 30 MUNSHI JAVEDUR JAMAN 14.96 0.00 0 100
4444 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap connection (FHTC) by retrofitting within the command area of AJHAPUR Piped Water Supply Scheme at Jamalpur Block under Burdwan Division, P.H.E. DTE. , SM/08701 Retrofitting Beautification of PWSS with Arboriculture, Recharge Pit including shaft and anciliary works at AJHAPUR (Jamalpur Block) P.W.S.S under Burdwan Division, PHE Dte. Junior Engineer, R.W.S. Burdwan Sub Division, P.H.E. Dt ORD/000545/2024-2025 276/RWS 03/09/2024 10 DEY NIRMAN 0.91 0.00 0 0
4445 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap connection (FHTC) by retrofitting within the command area of AJHAPUR Piped Water Supply Scheme at Jamalpur Block under Burdwan Division, P.H.E. DTE. , SM/08701 Retrofitting Conducting physical Household Survey at the IMIS reported village for HGJ certification and providing balance FHTC for Har Ghar Jal certification including conducting Gram Sabhas for different IMIS reported villages across the district under Burdwan Division, PHE Dte. AE(HQs),Assistant Engineer ,Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE.,Assistant Engineer, Durgapur Sub Division, P.H.E. Dte JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000428/2024-2025 3107/BWD 12/08/2024 90 TUBGRAM GRAMMYAK UNNAYAN SAMITY 309.60 0.00 0 50
4446 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap connection (FHTC) by retrofitting within the command area of AJHAPUR Piped Water Supply Scheme at Jamalpur Block under Burdwan Division, P.H.E. DTE. , SM/08701 Retrofitting Laying of pipeline for providing FHTC 100% coverage and also construction & installation of Sluice Valve & Valve Chamber to control the flow of water, road restoration work etc. of different Piped W/S Schemes, Block Jamalpur under Burdwan Division, PHE Dte. AE(HQs) Junior Engineer, Burdwan Division ORD/000194/2024-2025 2488/BWD 01/07/2024 120 M/S NATIONAL CONSTRUCTION 480.97 0.00 0 0
4447 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap connection (FHTC) by retrofitting within the command area of AJHAPUR Piped Water Supply Scheme at Jamalpur Block under Burdwan Division, P.H.E. DTE. , SM/08701 Retrofitting Construction of Boundary wall, Land Development for various PWSS, Block- Jamalpur, District:- Purba-Bardhaman within Burdwan Sub Division under Burdwan Division PHE Dte. AE(HQs) ORD/001100/2024-2025 433/BWD 20/01/2025 120 RABINDRA NATH GORANG 132.64 0.00 0 0
4448 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap connection (FHTC) by retrofitting within the command area of AJHAPUR Piped Water Supply Scheme at Jamalpur Block under Burdwan Division, P.H.E. DTE. , SM/08701 Retrofitting Construction of overhead structure for placing 2 Nos 5000 lit PVC tank including interconnection, Installation of Solar pump, FHTC, LDS & Sinking of 200 mm dia Tube Well 150 mtr. Depth by D.R. Rig method using UPVC pipe at Mohanpur village for AJHAPUR Piped Water Supply Scheme, Block- Jamalpur, District:- Purba-Bardhaman under Burdwan Division PHE Dte. AE(HQs) ORD/001251/2024-2025 817/BWD 04/03/2025 90 UJJWAL MUKHERJEE 23.02 0.00 0 0
4449 PURBA BARDHAMAN Burdwan Division Providing Functional House hold Tap Connection (FHTC) by retrofitting at Jotshyam, Jurepar, Kadipur, Medgachi, Muragachha, Naopara, Ramanandapur mouzas within the command area of Manikhar piped Water Supply Scheme at Mangolkote Block under Burdwan Divisio , SM/08712 Retrofitting Supply of materials for different water supply scheme under Burdwan Division, PHE Dte. VCH/001237/2021-2022 1132/DW 26/02/2022 EXECUTIVE ENGINEER, RESOURCES DIVISION, P.H.E. DTE. 221.00 0.00 0 0
4450 PURBA BARDHAMAN Burdwan Division Providing Functional House hold Tap Connection (FHTC) by retrofitting at Jotshyam, Jurepar, Kadipur, Medgachi, Muragachha, Naopara, Ramanandapur mouzas within the command area of Manikhar piped Water Supply Scheme at Mangolkote Block under Burdwan Divisio , SM/08712 Retrofitting Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of MANIKHAR Piped Water Supply Scheme at Kalna-I Block under Burdwan Division, PHE Dte. (Agreement No. 47/2020-2021 OF SE/CC/PHE. DTE.) Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000113/2020-2021 4787/BWD 02/12/2020 90 H SAMANTA 96.04 74.56 77.63 1
4451 PURBA BARDHAMAN Burdwan Division Providing Functional House hold Tap Connection (FHTC) by retrofitting at Jotshyam, Jurepar, Kadipur, Medgachi, Muragachha, Naopara, Ramanandapur mouzas within the command area of Manikhar piped Water Supply Scheme at Mangolkote Block under Burdwan Divisio , SM/08712 Retrofitting Sinking of 250 X 150mm dia Tube Well 150 mtr. Depth by D.R. Rig method using UPVC pipe (CM) and UPVC Medium Well Screen (RMS) for 2nd TW Site of MANIKHAR & its adjoining mouzas Piped Water Supply Scheme, Block Kalna I, Dist - Purba Bardhaman under Burdwan Division, PHE Dte. Assistant Engineer ORD/000704/2022-2023 658/BWD 21/02/2023 30 DAS CONSTRUCTION 8.72 8.14 93.35 1
4452 PURBA BARDHAMAN Burdwan Division Providing Functional House hold Tap Connection (FHTC) by retrofitting at Jotshyam, Jurepar, Kadipur, Medgachi, Muragachha, Naopara, Ramanandapur mouzas within the command area of Manikhar piped Water Supply Scheme at Mangolkote Block under Burdwan Divisio , SM/08712 Retrofitting Material Requisition To Resource Division RTOR000119/2021-2022 1112/BWD 26/02/2022 Resource Division 28.05 0.00 0 0
4453 PURBA BARDHAMAN Burdwan Division Providing Functional House hold Tap Connection (FHTC) by retrofitting at Jotshyam, Jurepar, Kadipur, Medgachi, Muragachha, Naopara, Ramanandapur mouzas within the command area of Manikhar piped Water Supply Scheme at Mangolkote Block under Burdwan Divisio , SM/08712 Retrofitting Digital structurization of pipeline alignment and asset evaluation including holistic design, preparation of design drawings of overall LDS & preparation of estimate for 11 Nos. Piped W/S. Schemes under Kalna I Block under Kalna Sub-Division under Burdwan Division, PHE. Dte. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000335/2024-2025 3015/BWD 05/08/2024 60 HORIZEN 29.60 0.00 0 10
4454 PURBA BARDHAMAN Burdwan Division Providing Functional House hold Tap Connection (FHTC) by retrofitting at Kasa, Denur, Patun and Bigha mouzas within the command area of Putsuri piped Water Supply Scheme at Manteswar Block under Burdwan Division, P.H.E. DTE. (Pt.-B) , SM/08715 Retrofitting Construction of concrete path way at Head Work Site & 2nd & 3rd Tube Well site along with plinth protection of Pump House No-I & laying of 200 mm dia DI Pipe for wash out and over flow drain of existing OHR of Putsuri W/S Scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer ORD/000038/2022-2023 2218/BWD 28/04/2022 30 BISHWAJIT DAS 4.07 0.00 0 0
4455 PURBA BARDHAMAN Burdwan Division Providing Functional House hold Tap Connection (FHTC) by retrofitting at Kasa, Denur, Patun and Bigha mouzas within the command area of Putsuri piped Water Supply Scheme at Manteswar Block under Burdwan Division, P.H.E. DTE. (Pt.-B) , SM/08715 Retrofitting Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of PUTSURI Piped Water Supply Scheme at Kasa (6 Nos. Habs.), Purba Balarampur, Bhurkunda (7 Nos. Habs.), Patun (5 Nos. Habs.) & Bigha (3 Nos. Habs.) Village (Mouza), Monteswar Block under Burdwan Division, PHE Dte. Assistant Engineer ORD/000302/2021-2022 7020/BWD 17/12/2021 60 INVENT ENGINEERS CO. OPERATIVE SOCIETY LTD. 53.94 45.21 83.82 1
4456 PURBA BARDHAMAN Burdwan Division Providing Functional House hold Tap Connection (FHTC) by retrofitting at Kasa, Denur, Patun and Bigha mouzas within the command area of Putsuri piped Water Supply Scheme at Manteswar Block under Burdwan Division, P.H.E. DTE. (Pt.-B) , SM/08715 Retrofitting Laying of different dia.UPVC pipeline at the damaged portion from Denur to Mousa Daukadanga under Putsuri & its adjoining mouzas water supply scheme within Kalna Sub-Division, under Burdwan Division, PHE Dte. Assistant Engineer ORD/000778/2021-2022 6013/BWD 05/10/2021 30 D.M. ENTERPRISE 23.17 0.00 0 1
4457 PURBA BARDHAMAN Burdwan Division Providing Functional House hold Tap Connection (FHTC) by retrofitting at Kasa, Denur, Patun and Bigha mouzas within the command area of Putsuri piped Water Supply Scheme at Manteswar Block under Burdwan Division, P.H.E. DTE. (Pt.-B) , SM/08715 Retrofitting Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of Putsuri Piped Water Supply Scheme at Denur (6 Nos Habitation Part) & Putsuri (11 Nos Habitation Part) Village (Mouza), Monteswar Block under Burdwan Division, PHE Dte.(Agreement No. 55/2020-2021 OF SE/CC/PHE. DTE.) AE(HQs) J.E. 2 BURDWAN ORD/000125/2020-2021 4887/BWD 07/12/2020 90 M/S S. CHOUDHURY 77.12 0.00 0 1
4458 PURBA BARDHAMAN Burdwan Division Providing Functional House hold Tap Connection (FHTC) by retrofitting at Kasa, Denur, Patun and Bigha mouzas within the command area of Putsuri piped Water Supply Scheme at Manteswar Block under Burdwan Division, P.H.E. DTE. (Pt.-B) , SM/08715 Retrofitting Construction of Pump House cum switch room (5.40m x 3.60m) with sanitary arrangement (As per drawing no-PHE/SE/CC/PH/ DWG-01/2022-2023) at Aug. of MANTESWAR Water Supply Scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. 1 No Pump House. Assistant Engineer ORD/001013/2023-2024 467/BWD 05/02/2024 60 BISHWAJIT DAS 5.86 0.00 0 0
4459 PURBA BARDHAMAN Burdwan Division Providing Functional House hold Tap Connection (FHTC) by retrofitting at Kasa, Denur, Patun and Bigha mouzas within the command area of Putsuri piped Water Supply Scheme at Manteswar Block under Burdwan Division, P.H.E. DTE. (Pt.-B) , SM/08715 Retrofitting Sinking of Tube Well, Construction of Pump House, Boundary wall & interconnection work of Kasa village of PUTSURI Water Supply Scheme within Kalna Sub-Division under Burdwan division, PHE Dte. Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer ,Junior Engineer1, Durgapur Sub-Division, PHE Dte. ORD/000721/2023-2024 4532/BWD 13/10/2023 60 B.S. ENTERPRISE 27.32 0.00 0 40
4460 PURBA BARDHAMAN Burdwan Division Providing Functional House hold Tap Connection (FHTC) by retrofitting at Kasa, Denur, Patun and Bigha mouzas within the command area of Putsuri piped Water Supply Scheme at Manteswar Block under Burdwan Division, P.H.E. DTE. (Pt.-B) , SM/08715 Retrofitting Conducting physical Household Survey at the IMIS reported village for HGJ certification and providing balance FHTC for Har Ghar Jal certification including conducting Gram Sabhas for different IMIS reported villages across the district under Burdwan Division, PHE Dte. AE(HQs),Assistant Engineer ,Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE.,Assistant Engineer, Durgapur Sub Division, P.H.E. Dte JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000428/2024-2025 3107/BWD 12/08/2024 90 TUBGRAM GRAMMYAK UNNAYAN SAMITY 309.60 0.00 0 50
4461 PURBA BARDHAMAN Burdwan Division Providing Functional House hold Tap Connection (FHTC) by retrofitting at Kasa, Denur, Patun and Bigha mouzas within the command area of Putsuri piped Water Supply Scheme at Manteswar Block under Burdwan Division, P.H.E. DTE. (Pt.-B) , SM/08715 Retrofitting Providing FHTC with laying of 75 mm dia HDPE Pipe of Putsuri PWSS of Hazra para Paschim village under Manteswar Block under Durgapur Sub Division of Burdwan Division ,P.H.E.Dte Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer1, Durgapur Sub-Division, PHE Dte. ORD/001159/2023-2024 265/DSD 15/03/2024 113 PRONAB KUMAR DEY 0.95 0.95 100 100
4462 PURBA BARDHAMAN Burdwan Division Augmentation of ground water based SHYAMSUNDAR PWSS to accommodate FHTC in RAINA-I block under Burdwan Sub Division of Burdwan Division in Purba Bardhaman District , SM/09495 Augmentation Supply of materials for different water supply scheme under Burdwan Division, PHE Dte. VCH/001578/2021-2022 1207/DW 10/03/2022 EXECUTIVE ENGINEER, RESOURCES DIVISION, P.H.E. DTE. 3,005.00 0.00 0 0
4463 PURBA BARDHAMAN Burdwan Division Augmentation of ground water based SHYAMSUNDAR PWSS to accommodate FHTC in RAINA-I block under Burdwan Sub Division of Burdwan Division in Purba Bardhaman District , SM/09495 Augmentation Route Survey & Preparation of DPR for Shyamsundar W/S Scheme under Raina-I Block under Burdwan Sub-Division under Burdwan Division PHE Dte. Sl No.7. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000495/2021-2022 182/BSD 31/01/2022 30 RADIANT 2.90 2.89 99.66 1
4464 PURBA BARDHAMAN Burdwan Division Augmentation of ground water based SHYAMSUNDAR PWSS to accommodate FHTC in RAINA-I block under Burdwan Sub Division of Burdwan Division in Purba Bardhaman District , SM/09495 Augmentation Concrete cutting of khalina, shibrampur, shyamsundar uttar para,shyamsundar dakshin para ,natungram village for Augmentation of Shyamsundar Piped Water Supply Scheme to provide house connection within Burdwan Sub-Division under Burdwan Division, PHE Dte. Gr.D. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000367/2022-2023 1406/BSD 10/08/2022 30 SK ALIM 4.68 4.68 100 1
4465 PURBA BARDHAMAN Burdwan Division Augmentation of ground water based SHYAMSUNDAR PWSS to accommodate FHTC in RAINA-I block under Burdwan Sub Division of Burdwan Division in Purba Bardhaman District , SM/09495 Augmentation Conversion of ACSR Cond to AB CABL of 11KV Shyamsundar Feeder Emanating from Raina S/STN at Shyamsundar PWSS under Burdwan Division, PHE Dte. [Ref ID-860250397, Application ID-100000060727, dt.-16/09/2022] VCH/000551/2022-2023 653/DW/22-23 28/09/2022 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LTD. 1.08 0.00 0 0
4466 PURBA BARDHAMAN Burdwan Division Augmentation of ground water based SHYAMSUNDAR PWSS to accommodate FHTC in RAINA-I block under Burdwan Sub Division of Burdwan Division in Purba Bardhaman District , SM/09495 Augmentation Supply of 100 mm dia C.I. Sluice valve(P.N.-I) of Augmentation of Shyamsundar Water Supply Scheme of Raina-I under Burdwan Sub Division, PHE Dte. Gr.F. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000479/2022-2023 1603/BSD 14/09/2022 15 SK ALIM 1.73 1.73 100 1
4467 PURBA BARDHAMAN Burdwan Division Augmentation of ground water based SHYAMSUNDAR PWSS to accommodate FHTC in RAINA-I block under Burdwan Sub Division of Burdwan Division in Purba Bardhaman District , SM/09495 Augmentation Extension of Pipeline for Shyamsundar village Uttar para of Augmentation of Shyamsundar Piped Water Supply Scheme to provide house connection within Burdwan Sub-Division under Burdwan Division, PHE Dte. Gr.G. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000480/2022-2023 1604/BSD 14/09/2022 30 M/S PROCHESTA ENTERPRISE 4.78 4.77 99.79 1
4468 PURBA BARDHAMAN Burdwan Division Augmentation of ground water based SHYAMSUNDAR PWSS to accommodate FHTC in RAINA-I block under Burdwan Sub Division of Burdwan Division in Purba Bardhaman District , SM/09495 Augmentation Extension of Pipeline for Shyamsundar village Dakshin para of Augmentation of Shyamsundar Piped Water Supply Scheme to provide house connection within Burdwan Sub-Division under Burdwan Division, PHE Dte. Gr.I. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000482/2022-2023 1606/BSD 14/09/2022 30 SK ABDUL HALIM 4.77 4.77 100 1
4469 PURBA BARDHAMAN Burdwan Division Augmentation of ground water based SHYAMSUNDAR PWSS to accommodate FHTC in RAINA-I block under Burdwan Sub Division of Burdwan Division in Purba Bardhaman District , SM/09495 Augmentation Extension of Pipeline for Natungram and Shyamsundar village of Augmentation of Shyamsundar Piped Water Supply Scheme to provide house connection within Burdwan Sub-Division under Burdwan Division, PHE Dte. Gr.C Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000441/2022-2023 1479/BSD 25/08/2022 45 SK ABDUL HALIM 4.84 4.83 99.79 1
4470 PURBA BARDHAMAN Burdwan Division Augmentation of ground water based SHYAMSUNDAR PWSS to accommodate FHTC in RAINA-I block under Burdwan Sub Division of Burdwan Division in Purba Bardhaman District , SM/09495 Augmentation Supply and delivery of different dia. CIDF sluice valve for Augmentation of Paharhati, Nababhat, Shyamsundar & Dewandighi-Mirzapur Piped Water Supply Scheme within Burdwan Sub-Division under Burdwan Division, P.H.E. Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000519/2022-2023 4703/BWD 19/10/2022 20 SSPR VALVE MANUFACTURING PVT LTD. 14.45 0.00 0 1
4471 PURBA BARDHAMAN Burdwan Division Augmentation of ground water based SHYAMSUNDAR PWSS to accommodate FHTC in RAINA-I block under Burdwan Sub Division of Burdwan Division in Purba Bardhaman District , SM/09495 Augmentation Sand filling at PWD road side near bazar to thana more(Drawing NOD 15 to 16,16 to 17,6 to 89,11 to 12,12 to 13,12 to 156,10 to 11,13 to 14,14 to 15,1 to 2 to 267,2 to 3 ,7 to 8,7 to 82,4 to 5 ,5 to 6,6 to 82,3 to 4. at Shyamsundar Water supply scheme of Raina Block within Burdwan Division, PHE Dte. Gr.A. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000501/2022-2023 1224/BSD 08/07/2022 7 SK ALIM 4.16 4.09 98.32 1
4472 PURBA BARDHAMAN Burdwan Division Augmentation of ground water based SHYAMSUNDAR PWSS to accommodate FHTC in RAINA-I block under Burdwan Sub Division of Burdwan Division in Purba Bardhaman District , SM/09495 Augmentation Sinking of 300 X 200mm dia Tube Well 150 mtr. Depth by D.R. Rig method using UPVC pipe (CM) and UPVC Deep Well Screen (RMS) for Augmentation of SHYAMSUNDAR & its adjoining mouzas Piped Water Supply Scheme [Shyamsundar Mouza], Block ¿ Raina ¿ I, Dist - Purba Bardhaman under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000509/2022-2023 4446/BWD 27/09/2022 30 SK ALIM 9.87 8.55 86.63 1
4473 PURBA BARDHAMAN Burdwan Division Augmentation of ground water based SHYAMSUNDAR PWSS to accommodate FHTC in RAINA-I block under Burdwan Sub Division of Burdwan Division in Purba Bardhaman District , SM/09495 Augmentation Material Requisition To Resource Division RTOR000053/2021-2022 532/BWD 27/01/2022 Resource Division 15.09 0.00 0 0
4474 PURBA BARDHAMAN Burdwan Division Augmentation of ground water based SHYAMSUNDAR PWSS to accommodate FHTC in RAINA-I block under Burdwan Sub Division of Burdwan Division in Purba Bardhaman District , SM/09495 Augmentation Material Requisition To Resource Division RTOR000089/2021-2022 901/BWD 15/02/2022 Resource Division 23.47 0.00 0 0
4475 PURBA BARDHAMAN Burdwan Division Augmentation of ground water based SHYAMSUNDAR PWSS to accommodate FHTC in RAINA-I block under Burdwan Sub Division of Burdwan Division in Purba Bardhaman District , SM/09495 Augmentation Material Requisition To Resource Division RTOR000216/2021-2022 1539/BWD 15/03/2022 Resource Division 0.37 0.00 0 0
4476 PURBA BARDHAMAN Burdwan Division Augmentation of ground water based SHYAMSUNDAR PWSS to accommodate FHTC in RAINA-I block under Burdwan Sub Division of Burdwan Division in Purba Bardhaman District , SM/09495 Augmentation Augmentation of SHYAMSUNDAR Piped Water Supply Scheme with LDS, Rising Main, Construction of 350 Cum capacity OHR with 20.0 Mtr. Staging height inclusive of soil test, Construction of boundary wall at Head works & 2nd TW site & FHTC under Raina ¿ I Block, District - Purba Bardhaman. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000598/2021-2022 1474/BWD 14/03/2022 360 SK ALIM 474.78 285.94 60.23 100
4477 PURBA BARDHAMAN Burdwan Division Augmentation of Ground Water based Piped Water Supply Scheme for DIGNAGAR to accommodate FHTC under Jal Sapno Mission under Ausgram-I Block in Purba Bardhaman District under Burdwan Division, P.H.E. DTE. , SM/09713 Augmentation Supply of materials for different water supply scheme under Burdwan Division, PHE Dte. VCH/001578/2021-2022 1207/DW 10/03/2022 EXECUTIVE ENGINEER, RESOURCES DIVISION, P.H.E. DTE. 3,005.00 0.00 0 0
4478 PURBA BARDHAMAN Burdwan Division Augmentation of Ground Water based Piped Water Supply Scheme for DIGNAGAR to accommodate FHTC under Jal Sapno Mission under Ausgram-I Block in Purba Bardhaman District under Burdwan Division, P.H.E. DTE. , SM/09713 Augmentation Route Survey & Preparation of DPR for DIGNAGAR PWSS under Durgapur (Bardhaman North) Sub-Division under Burdwan Division PHE Dte.[SL-B] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000648/2021-2022 100/DSD 18/02/2022 15 SIRCON ENGINEERING SERVICES 2.81 2.81 100 1
4479 PURBA BARDHAMAN Burdwan Division Augmentation of Ground Water based Piped Water Supply Scheme for DIGNAGAR to accommodate FHTC under Jal Sapno Mission under Ausgram-I Block in Purba Bardhaman District under Burdwan Division, P.H.E. DTE. , SM/09713 Augmentation Sinking of additional 300 X 200mm dia Tube Well 200 mtr. Depth by D.R. Rig method using UPVC pipe (CD) and UPVC Deep Well Screen (RDS) for Augmentation of DIGNAGAR Piped Water Supply Scheme, Block - Ausgram I, Dist Purba Bardhaman under Burdwan Division, PHE Dte. Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000056/2022-2023 2234/BWD 29/04/2022 30 J. K. CORPORATION 14.12 12.03 85.2 1
4480 PURBA BARDHAMAN Burdwan Division Augmentation of Ground Water based Piped Water Supply Scheme for DIGNAGAR to accommodate FHTC under Jal Sapno Mission under Ausgram-I Block in Purba Bardhaman District under Burdwan Division, P.H.E. DTE. , SM/09713 Augmentation Supply and delivery of different dia. CIDF sluice valve for Augmentation of Dignagar, Galsi, Barabelun & Kotachandipur Piped Water Supply Scheme within Durgapur (Burdwan North) Sub-Division under Burdwan Division, P.H.E. Dte. _2ND CALL Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000311/2022-2023 3624/BWD 22/08/2022 20 SSPR VALVE MANUFACTURING PVT LTD. 14.76 3.69 25 1
4481 PURBA BARDHAMAN Burdwan Division Augmentation of Ground Water based Piped Water Supply Scheme for DIGNAGAR to accommodate FHTC under Jal Sapno Mission under Ausgram-I Block in Purba Bardhaman District under Burdwan Division, P.H.E. DTE. , SM/09713 Augmentation Laying of UPVC pipe line by replacement of AC pipe, installation new SSP and Sluice valve, restoration of existing Street Stand Posts, Valve chamber, and allied work of DIGNAGAR W/S Scheme under Durgapur (Burdwan North)Sub Division under Burdwan Division, P.H.E. Dte.[Gr.-F] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000187/2021-2022 624/DSD 25/10/2021 45 ANWESHA CONSTRUCTION 2.08 2.04 98.08 1
4482 PURBA BARDHAMAN Burdwan Division Augmentation of Ground Water based Piped Water Supply Scheme for DIGNAGAR to accommodate FHTC under Jal Sapno Mission under Ausgram-I Block in Purba Bardhaman District under Burdwan Division, P.H.E. DTE. , SM/09713 Augmentation Quotation for Dignagar water supply scheme. P.H. No.-03 [Quotation Memo No.-5003612925/Quot/03, dt.-17/02/2023] BILL/00374/2022-2023 1169/JJM 10/03/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LTD. 2.06 0.00 0 0
4483 PURBA BARDHAMAN Burdwan Division Augmentation of Ground Water based Piped Water Supply Scheme for DIGNAGAR to accommodate FHTC under Jal Sapno Mission under Ausgram-I Block in Purba Bardhaman District under Burdwan Division, P.H.E. DTE. , SM/09713 Augmentation Augmentation of DIGNAGAR Piped Water Supply Scheme with LDS, FHTC Work, Rising Main, Switch room (with water supply & sanitary arrangements), 400 cum capacity OHR with 20.0 Mtr. Staging height inclusive of soil test & Boundary wall construction (New TW Site) with repairing of existing switch room cum chlorine room, Block ¿ Ausgram ¿ I, District - Purba Bardhaman. Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000410/2021-2022 289/BWD 17/01/2022 365 S.S. ENTERPRISE 390.11 388.86 99.68 1
4484 PURBA BARDHAMAN Burdwan Division Augmentation of Ground Water based Piped Water Supply Scheme for DIGNAGAR to accommodate FHTC under Jal Sapno Mission under Ausgram-I Block in Purba Bardhaman District under Burdwan Division, P.H.E. DTE. , SM/09713 Augmentation Material Requisition To Resource Division RTOR000028/2021-2022 552/BWD 27/01/2022 Resource Division 12.66 0.00 0 0
4485 PURBA BARDHAMAN Burdwan Division Augmentation of Ground Water based Piped Water Supply Scheme for DIGNAGAR to accommodate FHTC under Jal Sapno Mission under Ausgram-I Block in Purba Bardhaman District under Burdwan Division, P.H.E. DTE. , SM/09713 Augmentation Material Requisition To Resource Division RTOR000166/2021-2022 1326/BWD 08/03/2022 Resource Division 36.24 0.00 0 0
4486 PURBA BARDHAMAN Burdwan Division Augmentation of Ground Water based Piped Water Supply Scheme for DIGNAGAR to accommodate FHTC under Jal Sapno Mission under Ausgram-I Block in Purba Bardhaman District under Burdwan Division, P.H.E. DTE. , SM/09713 Augmentation Material Requisition To Resource Division RTOR000184/2021-2022 1379/BWD 09/03/2022 Resource Division 4.45 0.00 0 0
4487 PURBA BARDHAMAN Burdwan Division Augmentation of Ground Water based Piped Water Supply Scheme for DIGNAGAR to accommodate FHTC under Jal Sapno Mission under Ausgram-I Block in Purba Bardhaman District under Burdwan Division, P.H.E. DTE. , SM/09713 Augmentation Material Requisition To Resource Division RTOR000064/2021-2022 618/BWD 28/01/2022 Resource Division 22.71 0.00 0 0
4488 PURBA BARDHAMAN Burdwan Division Augmentation of Ground Water based Piped Water Supply Scheme for DIGNAGAR to accommodate FHTC under Jal Sapno Mission under Ausgram-I Block in Purba Bardhaman District under Burdwan Division, P.H.E. DTE. , SM/09713 Augmentation Material Requisition To Resource Division RTOR000234/2021-2022 1558/BWD 15/03/2022 Resource Division 0.37 0.00 0 0
4489 PURBA BARDHAMAN Burdwan Division Augmentation of Ground Water based Piped Water Supply Scheme for DIGNAGAR to accommodate FHTC under Jal Sapno Mission under Ausgram-I Block in Purba Bardhaman District under Burdwan Division, P.H.E. DTE. , SM/09713 Augmentation Installation of AIR valve with MS pipe Connection near both side of Dignagar irrigation Canal under Augmentation of DIGNAGAR and its adjoining mouza¿s piped W/S Scheme at Ausgram-I Block within Durgapur Sub- Division (Burdwan North) under Burdwan Division PHE Dte. Assistant Engineer, Durgapur Sub Division, P.H.E. Dte JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000940/2023-2024 912/DSD 15/12/2023 30 S.S. ENTERPRISE 0.96 0.00 0 100
4490 PURBA BARDHAMAN Durgapur W/S Division Augmentation of Ground Water based Piped Water Supply Scheme for DIGNAGAR to accommodate FHTC under Jal Sapno Mission under Ausgram-I Block in Purba Bardhaman District under Burdwan Division, P.H.E. DTE. , SM/09713 Augmentation Acceptance cum formal work order for the work of " Supplying & Laying of different dia UPVC pipe at Dignagar under Dignagar PWSS, Block- Aushgram-I, Dist- Purba Bardhaman under Durgapur W/S Division, PHE Dte. Assistant Engineer-II Contractual Junior Engineer_4 ORD/000037/2024-2025 761/DWSD 06/06/2024 260 SAFTI PRIVATE LIMITED 53.80 0.00 0 35
4491 PURBA BARDHAMAN Durgapur W/S Division Augmentation of Ground Water based Piped Water Supply Scheme for DIGNAGAR to accommodate FHTC under Jal Sapno Mission under Ausgram-I Block in Purba Bardhaman District under Burdwan Division, P.H.E. DTE. , SM/09713 Augmentation Material Requisition To Resource Division RTOR000045/2024-2025 465/DWSD 17/03/2025 Resource Division 0.14 0.00 0 0
4492 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Gramdihi Piped Water Supply Scheme at Bhatar Block , SM/07777 Retrofitting Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of Gramdihi Piped Water Supply Scheme at Mandarbati, Gholada & Bigra Village (Mouza), Bhatar Block under Burdwan Division, PHE Dte. (Agreement no. 792/BWD of 2020-2021) Assistant Engineer ORD/000434/2020-2021 1794/BWD 26/02/2021 45 M/S GUPTA ENTERPRISE 41.94 33.90 80.83 1
4493 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Gramdihi Piped Water Supply Scheme at Bhatar Block , SM/07777 Retrofitting Extension of UPVC pipe line of LDS at Gholada village for providing FHTC of Gramdihi and its adjoining mouzas W/S Scheme within Bhatar Block under Burdwan Division, P.H.E. Dte. [Gr.-C] Assistant Engineer ORD/000264/2021-2022 691/DSD 08/12/2021 30 M/S GUPTA ENTERPRISE 4.84 0.00 0 1
4494 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Gramdihi Piped Water Supply Scheme at Bhatar Block , SM/07777 Retrofitting Extension of pipeline in Connection to FHTC work at Gramdihi village of Gramdihi and its adjoining Mouza's Piped W/S Scheme at Bhatar Block within Durgapur (Bardhaman North)Sub-Division under Burdwan Division, P.H.E. Dte. (Gr.-A) Assistant Engineer ORD/000105/2021-2022 416/DSD 02/07/2021 30 DEY NIRMAN 4.71 0.23 4.88 1
4495 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Gramdihi Piped Water Supply Scheme at Bhatar Block , SM/07777 Retrofitting Extension of UPVC pipe line of LDS at Bighra village for providing FHTC of Gramdihi and its adjoining mouzas W/S Scheme within Bhatar Block under Burdwan Division, P.H.E. Dte. [Gr.-D] Assistant Engineer ORD/000265/2021-2022 692/DSD 08/12/2021 30 SHUBHRA KANTI GHOSH 4.30 4.10 95.35 1
4496 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Gramdihi Piped Water Supply Scheme at Bhatar Block , SM/07777 Retrofitting Extension of UPVC pipe line of LDS at Manderbati village and Majhipara for providing FHTC of Gramdihi and its adjoining mouzas W/S Scheme within Bhatar Block under Burdwan Division, P.H.E. Dte. [Gr.-B] Assistant Engineer ORD/000263/2021-2022 690/DSD 08/12/2021 30 BIPLAB SAMANTA 2.26 2.22 98.23 1
4497 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Gramdihi Piped Water Supply Scheme at Bhatar Block , SM/07777 Retrofitting Providing leftout water tap connection in different villages for 100% coverage to make it Sajal Gram from existing distribution system within scheme jurisdiction of different Piped Water Supply Schemes within Bhatar Block under Burdwan Division, PHE. Dte. Assistant Engineer ,Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000389/2021-2022 268/BWD 14/01/2022 30 BHARAT CONSTRUCTION 14.17 7.45 52.58 1
4498 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Gramdihi Piped Water Supply Scheme at Bhatar Block , SM/07777 Retrofitting Payment of vehicle bill (Car No.-WB-41H-9788) for the month of September'23. BILL/01343/2023-2024 899/JJM 22/11/2023 SK. ASRAFUDDIN 0.40 0.00 0 0
4499 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Gramdihi Piped Water Supply Scheme at Bhatar Block , SM/07777 Retrofitting Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of Gramdihi Piped Water Supply Scheme at Gramdihi & Sanchalida Village (Mouza), Bhatar Block under Burdwan Division, PHE Dte. [Agreement No. 631/BWD OF 2020-2021.] AE(HQs) J.E. 2 BURDWAN ORD/000436/2020-2021 956/BWD 03/02/2021 45 DEY NIRMAN 35.08 20.50 58.44 0
4500 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Gramdihi Piped Water Supply Scheme at Bhatar Block , SM/07777 Retrofitting Restoration of damaged flanks due to laying of HDPE pipe line along the flank of Burdwan Katwa Road from 14.70 kmp to 16.20 kmp in the district of Purba Bardhaman under Bardhaman Division,P.W.D. BILL/00711/2024-2025 867/JJM 23/09/2024 EXECUTIVE ENGINEER PWD BURDWAN DIVISION 7.90 0.00 0 null
4501 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Gramdihi Piped Water Supply Scheme at Bhatar Block , SM/07777 Retrofitting Restoration of work due to laying of Water Supply Pipelines along Bonpass Village(Kamarpara) to Banpass Railway Station Road by Public Health Engineering Directorate under " Jal Jeevan Mission from 0.00 km to 1.54 km in the district of Purba Bardhaman under Burdwan Division,P.W.D." BILL/00709/2024-2025 866/JJM 23/09/2024 EXECUTIVE ENGINEER PWD BURDWAN DIVISION 2.94 0.00 0 null
4502 PURBA BARDHAMAN Burdwan Division Augmentation of ground water based KAITY PWSS to accommodate FHTC in Raina-II block under Burdwan Sub Division of Burdwan Division in Purba Bardhaman District , SM/10130 Augmentation Supply of materials for different water supply scheme under Burdwan Division, PHE Dte. VCH/001578/2021-2022 1207/DW 10/03/2022 EXECUTIVE ENGINEER, RESOURCES DIVISION, P.H.E. DTE. 3,005.00 0.00 0 0
4503 PURBA BARDHAMAN Burdwan Division Augmentation of ground water based KAITY PWSS to accommodate FHTC in Raina-II block under Burdwan Sub Division of Burdwan Division in Purba Bardhaman District , SM/10130 Augmentation Route Survey & Preparation of DPR for Kaity W/S Scheme under Raina-II Block under Burdwan Sub-Division under Burdwan Division PHE Dte. Sl No.16. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000505/2021-2022 191/BSD 31/01/2022 30 RADIANT 3.43 3.42 99.71 1
4504 PURBA BARDHAMAN Burdwan Division Augmentation of ground water based KAITY PWSS to accommodate FHTC in Raina-II block under Burdwan Sub Division of Burdwan Division in Purba Bardhaman District , SM/10130 Augmentation Quotation for shifting of 25 KVA DTR along with 11 KV HTOH Kaity Feeder at Kaity PHE campus under Madhabdihi-CCC. [Ref Id-860252403] VCH/000627/2022-2023 726/DW/22-23 03/11/2022 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LTD. 1.71 0.00 0 0
4505 PURBA BARDHAMAN Burdwan Division Augmentation of ground water based KAITY PWSS to accommodate FHTC in Raina-II block under Burdwan Sub Division of Burdwan Division in Purba Bardhaman District , SM/10130 Augmentation Sinking of 300 X 200mm dia Tube Well 150 mtr. Depth by D.R. Rig method using UPVC pipe (CM) and UPVC Medium Well Screen (RMS) for Augmentation of KAITY & its adjoining mouzas Piped Water Supply Scheme, Block - Raina - II, Dist - Purba Bardhaman under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000538/2022-2023 5026/BWD 10/11/2022 30 M/S D. PALIT & CO. 10.06 8.33 82.8 1
4506 PURBA BARDHAMAN Burdwan Division Augmentation of ground water based KAITY PWSS to accommodate FHTC in Raina-II block under Burdwan Sub Division of Burdwan Division in Purba Bardhaman District , SM/10130 Augmentation Sinking of 300 X 200mm dia Tube Well 150 mtr. Depth by D.R. Rig method using UPVC pipe (CM) and UPVC Medium Well Screen (RMS) for 3rd TW Site of Aug. KAITY & its adjoining mouzas Piped Water Supply Scheme, Block ¿ Raina ¿ II, Dist - Purba Bardhaman under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000569/2022-2023 5281/BWD 01/12/2022 30 MUNSHI ENTERPRISE 11.34 0.00 0 0
4507 PURBA BARDHAMAN Burdwan Division Augmentation of ground water based KAITY PWSS to accommodate FHTC in Raina-II block under Burdwan Sub Division of Burdwan Division in Purba Bardhaman District , SM/10130 Augmentation Construction of Pump House cum chlorine room without sanitary and water supply arrangement at Tube Well Site to departmental drawing no-PHE/BD/P.H/DRG/02/DEC-17(Size 3.60 mtr x 3.00 mtr room) for KAITY its Adjoining Mouza W/S Scheme, Block -Raina-II within Burdwan Sub-Division, PHE Dte. (Mouza- DURGABATI) Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000768/2022-2023 503/BSD 21/03/2023 45 DEBJYOTI GOSWAMI 3.61 2.85 78.95 100
4508 PURBA BARDHAMAN Burdwan Division Augmentation of ground water based KAITY PWSS to accommodate FHTC in Raina-II block under Burdwan Sub Division of Burdwan Division in Purba Bardhaman District , SM/10130 Augmentation 02 Nos. Quotation for new connection of WBSEDCL of Augmentation of Kaity water supply scheme. BILL/00195/2023-2024 302/JJM/23-24 28/06/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LTD. 12.21 0.00 0 0
4509 PURBA BARDHAMAN Central Mechanical Augmentation of ground water based KAITY PWSS to accommodate FHTC in Raina-II block under Burdwan Sub Division of Burdwan Division in Purba Bardhaman District , SM/10130 Augmentation Supply & Installation of Submersible Pumping Machinery , Voltage Stabilizer, Chlorination system and internal House wiring of Tube Well No- 01 & 02 at Augmentation Kaity [Block ¿Raina-II] Water Supply Scheme under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000918/2022-2023 1082/CMD 03/03/2023 30 JOYGURU ENTERPRISE 12.31 11.96 97.16 100
4510 PURBA BARDHAMAN Central Mechanical Augmentation of ground water based KAITY PWSS to accommodate FHTC in Raina-II block under Burdwan Sub Division of Burdwan Division in Purba Bardhaman District , SM/10130 Augmentation Installation of Electro-mechanical accessories at Kaity PH-1 (replacement T.W) Water Supply Scheme under CMD, PHE Dte., Dist.- Purba-Bardhaman ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000993/2023-2024 4352/CMD 20/09/2023 30 MITRA ENTERPRISE 3.28 3.28 100 100
4511 PURBA BARDHAMAN Burdwan Division Augmentation of ground water based KAITY PWSS to accommodate FHTC in Raina-II block under Burdwan Sub Division of Burdwan Division in Purba Bardhaman District , SM/10130 Augmentation Material Requisition To Resource Division RTOR000190/2021-2022 1385/BWD 09/03/2022 Resource Division 4.26 0.00 0 0
4512 PURBA BARDHAMAN Burdwan Division Augmentation of ground water based KAITY PWSS to accommodate FHTC in Raina-II block under Burdwan Sub Division of Burdwan Division in Purba Bardhaman District , SM/10130 Augmentation Material Requisition To Resource Division RTOR000228/2021-2022 1550/BWD 15/03/2022 Resource Division 0.37 0.00 0 0
4513 PURBA BARDHAMAN Burdwan Division Augmentation of ground water based KAITY PWSS to accommodate FHTC in Raina-II block under Burdwan Sub Division of Burdwan Division in Purba Bardhaman District , SM/10130 Augmentation Allied works for Augmentation of KAITY W/S Scheme under Burdwan Division, PHE. Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000345/2023-2024 3034/BWD 14/07/2023 90 SK ALIM 122.65 65.81 53.66 100
4514 PURBA BARDHAMAN Burdwan Division Augmentation of ground water based KAITY PWSS to accommodate FHTC in Raina-II block under Burdwan Sub Division of Burdwan Division in Purba Bardhaman District , SM/10130 Augmentation Augmentation of KAITY Piped Water Supply Scheme with LDS, FHTC, Rising main, Construction of 700 cum capacity OHR with 20.0 mtr. Staging height inclusive of soil investigation under RAINA- II Block, District:- Purba-Burdwan. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000124/2022-2023 2930/BWD 28/06/2022 365 SK ALIM 689.36 665.64 96.56 100
4515 PURBA BARDHAMAN Burdwan Division Augmentation of ground water based KAITY PWSS to accommodate FHTC in Raina-II block under Burdwan Sub Division of Burdwan Division in Purba Bardhaman District , SM/10130 Augmentation Laying Distribution for FHTC work including laying of parallel line for KAITY Piped Water Supply Scheme and its adjoining mouzas within RAINA-II BLOCK under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/001029/2024-2025 143/BWD 08/01/2025 90 M/S ANAND CONSTRUCTION 19.77 0.00 0 0
4516 PURBA BARDHAMAN Burdwan Division DETAILED PROJECT REPORT FOR AUGMENTATION OF BORSHUL (ZONE-II) PWSS BURDWAN-II PURBA BARDHAMAN , SM/10481 Augmentation Route Survey & Preparation of DPR for Borsul (Zone-I) & (Zone-II) W/S Scheme under Burdwan-II Block under Burdwan Sub-Division under Burdwan Division PHE Dte. Sl No.1. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000510/2021-2022 176/BSD 31/01/2022 30 APEX ENGINEERING 4.18 4.18 100 1
4517 PURBA BARDHAMAN Central Mechanical DETAILED PROJECT REPORT FOR AUGMENTATION OF BORSHUL (ZONE-II) PWSS BURDWAN-II PURBA BARDHAMAN , SM/10481 Augmentation New service connection charges for Borshul PWSS Z-II TW-1 BILL/01414/2023-2024 BP-2023-24-140 28/08/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 5.99 0.00 0 0
4518 PURBA BARDHAMAN Burdwan Division DETAILED PROJECT REPORT FOR AUGMENTATION OF BORSHUL (ZONE-II) PWSS BURDWAN-II PURBA BARDHAMAN , SM/10481 Augmentation Material Requisition To Resource Division RTOR000045/2022-2023 4852/BWD 20/10/2022 Resource Division 12.32 0.00 0 0
4519 PURBA BARDHAMAN Burdwan Division DETAILED PROJECT REPORT FOR AUGMENTATION OF BORSHUL (ZONE-II) PWSS BURDWAN-II PURBA BARDHAMAN , SM/10481 Augmentation Sinking of 250 X 150mm dia Tube Well 150 mtr. Depth by D.R. Rig method using UPVC pipe (CD) and UPVC Deep Well Screen (RDS) at BELNA Mouza & Head Works Site for BORSHUL (Zone-II) Piped Water Supply Scheme, Block - Burdwan - II, Dist - Purba Bardhaman under Burdwan Division, PHE Dte. [For 02 Nos. Tube well]. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. Junior Engineer, Burdwan Sadar Sub-Division ORD/000206/2023-2024 2709/BWD 08/06/2023 45 M/S D. PALIT & CO. 19.82 8.90 44.9 100
4520 PURBA BARDHAMAN Central Mechanical DETAILED PROJECT REPORT FOR AUGMENTATION OF BORSHUL (ZONE-II) PWSS BURDWAN-II PURBA BARDHAMAN , SM/10481 Augmentation New service connection charges for Borshul PWSS ZONE-II, TW-2 BILL/01827/2023-2024 BP-2023-24-335 06/01/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 7.11 0.00 0 0
4521 PURBA BARDHAMAN Burdwan Division DETAILED PROJECT REPORT FOR AUGMENTATION OF BORSHUL (ZONE-II) PWSS BURDWAN-II PURBA BARDHAMAN , SM/10481 Augmentation Construction of Pump House cum chlorine room without sanitary and water supply arrangement at Tube Well Site to departmental drawing no-PHE/BD/P.H/DRG/02/DEC-17(Size 3.60 mtr x 3.00 mtr room) for BARSUL ZONE-II its Adjoining Mouza W/S Scheme, Block -BURDWAN-II within Burdwan Sub-Division, PHE Dte. (Mouza- Belna) Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. Junior Engineer, Burdwan Sadar Sub-Division ORD/000772/2022-2023 509/BSD 21/03/2023 45 MOHAMMAD ISSA 3.49 1.45 41.55 100
4522 PURBA BARDHAMAN Burdwan Division DETAILED PROJECT REPORT FOR AUGMENTATION OF BORSHUL (ZONE-II) PWSS BURDWAN-II PURBA BARDHAMAN , SM/10481 Augmentation Construction of 3.6mtr.x3.0mtr.Size pump house including plinth protection with surface drain at Head Work TW site for Borshul (Zone-II) Water Supply Scheme, Block: Burdwan-II within Burdwan Division, PHE Dte. Dist.-Purba Bardhaman. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. Junior Engineer, Burdwan Sadar Sub-Division ORD/000589/2023-2024 2042/BSD 24/08/2023 45 RAHAMAN ENTERPRISE 4.84 0.00 0 100
4523 PURBA BARDHAMAN Burdwan Division DETAILED PROJECT REPORT FOR AUGMENTATION OF BORSHUL (ZONE-II) PWSS BURDWAN-II PURBA BARDHAMAN , SM/10481 Augmentation Improvement works of Borshul Godown & other allied works under Augmentation of BORSHUL (Zone-II) PWSS in Bardhaman-II Block. (SM/10481) within Burdwan Division PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000187/2024-2025 2418/BWD 27/06/2024 90 ANWESHA CONSTRUCTION 20.86 0.00 0 0
4524 PURBA BARDHAMAN Burdwan Division DETAILED PROJECT REPORT FOR AUGMENTATION OF BORSHUL (ZONE-II) PWSS BURDWAN-II PURBA BARDHAMAN , SM/10481 Augmentation Improvement works including repairing & remodelling of Borshul Inspection Banglow under Augmentation of BORSHUL (Zone-II) PWSS in Bardhaman-II Block. (SM/10481) within Burdwan Division PHE Dte. AE(HQs),ASSISTANT ENGINEER R.W.S. BURDWAN SUB-DIVISION PHE DTE ORD/000285/2024-2025 2971/BWD 31/07/2024 90 ESCON INDIA 15.27 0.00 0 0
4525 PURBA BARDHAMAN Central Mechanical DETAILED PROJECT REPORT FOR AUGMENTATION OF BORSHUL (ZONE-II) PWSS BURDWAN-II PURBA BARDHAMAN , SM/10481 Augmentation Quotation for new service connection at Borsul W/S Scheme Zone-II, PH-III. BILL/00862/2024-2025 BP-2024-25-334 04/10/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.86 0.00 0 0
4526 PURBA BARDHAMAN Central Mechanical DETAILED PROJECT REPORT FOR AUGMENTATION OF BORSHUL (ZONE-II) PWSS BURDWAN-II PURBA BARDHAMAN , SM/10481 Augmentation Supply & Installation of Submersible Pumping Machinery , Voltage Stabilizer, Chlorination system and internal House wiring of Tube Well No- 01, 02 & 03 at Augmentation Borsul (Zone-II) [Block ¿Burdwan -2] Water Supply Scheme under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER Junior Engineer ORD/000914/2023-2024 4178/CMD 29/08/2023 491 M/S, S.S. ENTERPRISE. 35.95 0.00 0 100
4527 PURBA BARDHAMAN Burdwan Division DETAILED PROJECT REPORT FOR AUGMENTATION OF BORSHUL (ZONE-II) PWSS BURDWAN-II PURBA BARDHAMAN , SM/10481 Augmentation Construction of boundary wall at 2nd T/W Site (Belna-Mouza) of BARSUL Zone II Piped W/S. Scheme under Burdwan-II Block of Burdwan Division, PHE Dte. (Length =100.00 Mtr, Col-36 Nos). Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. Junior Engineer, Burdwan Sadar Sub-Division ORD/000487/2024-2025 3142/BWD 20/08/2024 134 PANCHANAN CHAKROBORTY 6.77 0.00 0 100
4528 PURBA BARDHAMAN Burdwan Division DETAILED PROJECT REPORT FOR AUGMENTATION OF BORSHUL (ZONE-II) PWSS BURDWAN-II PURBA BARDHAMAN , SM/10481 Augmentation Construction of switch room, rising main & Sinking of Tube-well at 3rd TW SITE for BARSHUL Zone-II Piped Water Supply Scheme under BARDHAMAN-II Block, District:- Purba-Bardhaman. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. Junior Engineer, Burdwan Sadar Sub-Division ORD/001101/2023-2024 1128/BWD 14/03/2024 292 M/S R.K. SAMANTA & CO. 19.02 0.00 0 100
4529 PURBA BARDHAMAN Burdwan Division DETAILED PROJECT REPORT FOR AUGMENTATION OF BORSHUL (ZONE-II) PWSS BURDWAN-II PURBA BARDHAMAN , SM/10481 Augmentation Augmentation of Borshul (Zone-II) (Mouzas :- Belna, Manikhati, Jafrabad, Kalinagar, Baje Salepur, Totopara) Piped Water Supply Scheme with LDS, FHTC, Rising main, Construction of 250 cum capacity OHR with 20.0 mtr. Staging height inclusive of soil investigation under BARDHAMAN- II Block, District:- Purba-Burdwan. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. Junior Engineer, Burdwan Sadar Sub-Division ORD/000151/2022-2023 3101/BWD 14/07/2022 898 ASHOK KUMAR GHOSH 342.55 243.43 71.06 80
4530 PURBA BARDHAMAN Burdwan Division DETAILED PROJECT REPORT FOR AUGMENTATION OF BORSHUL (ZONE-II) PWSS BURDWAN-II PURBA BARDHAMAN , SM/10481 Augmentation Construction of boundary wall at 1ST TUBE WALL (HEAD WORK) Site of BARSUL Zone-II Piped W/S. Scheme under Burdwan-II Block of Burdwan Division, PHE Dte. (Length =174.00 Mtr, Col-65 Nos). Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. Junior Engineer, Burdwan Sadar Sub-Division ORD/000227/2024-2025 2521/BWD 03/07/2024 181 RAHAMAN ENTERPRISE 13.25 0.00 0 100
4531 PURBA BARDHAMAN Burdwan Division DETAILED PROJECT REPORT FOR AUGMENTATION OF BORSHUL (ZONE-II) PWSS BURDWAN-II PURBA BARDHAMAN , SM/10481 Augmentation Different Types of work involved in connection with different Augmentation & New Schemes (11 Nos.) Piped Water Supply Scheme under Burdwan II Block within Burdwan Sub-Div., under Burdwan Division PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/001349/2024-2025 1060/BWD 25/03/2025 120 R.G. INFRASTRUCTURE 262.23 0.00 0 0
4532 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of NABASTHA Piped Water Supply Scheme , SM/07864 Retrofitting Providing Functional Household tap connection (FHTC) from existing distribution system within the command area of NABASTHA piped water supply scheme at Begut, Bodhpur, Chakundi, Nabastha & Palsha village, Burdwan-II Block under Burdwan Division, PHE Dte.[Tr No.-65/BWD/20-21] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000385/2020-2021 5003/BWD 10/12/2020 90 M/S ASHA CONSTRUCTION 88.60 52.61 59.38 1
4533 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of NABASTHA Piped Water Supply Scheme , SM/07864 Retrofitting Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of Nabastha Piped Water Supply Scheme at Saligram (9 Nos Habitation) Village (Mouza), Burdwan-II Block under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000040/2021-2022 3447/BWD 29/06/2021 30 PAL CONSTRUCTION 19.73 18.95 96.05 1
4534 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of NABASTHA Piped Water Supply Scheme , SM/07864 Retrofitting Providing FHTC from existing distribution pipe line system within command area of Nabastha Piped W/S. Scheme at Chakundi- Mouza, Bardhaman-II Development Block under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000162/2022-2023 3138/BWD 19/07/2022 30 BABUL SK 11.86 12.12 102.19 1
4535 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of NABASTHA Piped Water Supply Scheme , SM/07864 Retrofitting Speacial repairing and replace damaged pipe line from Nabastha bus stand to saligram & chakundi village of Nabastha piped water supply scheme at Bardhhaman-II Block under Burdwan Div., PHE Dte.Gr.A. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000643/2021-2022 467/BSD 21/03/2022 30 SETH ENTERPRISE 4.82 4.77 98.96 1
4536 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of NABASTHA Piped Water Supply Scheme , SM/07864 Retrofitting Hire & fuel charges of vehicle (Car No.-WB-04H-9111) for the office of the Superintending Engineer, Central Circle, PHE Dte. for the month of December'22 & January'23. BILL/00469/2022-2023 1116/JJM 27/02/2023 SOURAV JANA 0.80 0.00 0 0
4537 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of NABASTHA Piped Water Supply Scheme , SM/07864 Retrofitting Construction of boundary wall at Head works site of NABASTHA Piped Water Supply Scheme in Burdwan-II Block under Burdwan Division, PHE Dte. (Length - 154 Mtr., 69 Nos Column). Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000097/2022-2023 2742/BWD 08/06/2022 30 MOYAZZEM CONSTRUCTION 10.54 10.01 94.97 1
4538 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of NABASTHA Piped Water Supply Scheme , SM/07864 Retrofitting Laying of distribution system of different damaged section at Begut, Nabastha & Palsha village regarding smooth running FHTC work within Nabastha PWSS, Bardhhaman-II Development Block under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. Junior Engineer, Burdwan Sadar Sub-Division ORD/000136/2023-2024 784/BSD 28/04/2023 30 D.M. ENTERPRISE 0.95 0.94 98.95 100
4539 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of NABASTHA Piped Water Supply Scheme , SM/07864 Retrofitting Hire & fuel charges of vehicle (Car No.-WB-41J-6795) for the office of the Deputy Superintending Engineer, Central Circle, PHE Dte. for the month of March to May'23. BILL/00461/2023-2024 430/JJM 25/07/2023 MD HASIN 1.04 0.00 0 0
4540 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of NABASTHA Piped Water Supply Scheme , SM/07864 Retrofitting Providing leftout water tap connection in different villages for 100% coverage in Sajal Gram from existing distribution system within scheme jurisdiction of different Piped Water Supply Schemes within Burdwan ¿ II Block under Burdwan Division, PHE. Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000416/2021-2022 385/BWD 20/01/2022 30 BISWAS ENTERPRISE 11.97 0.00 0 100
4541 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of NABASTHA Piped Water Supply Scheme , SM/07864 Retrofitting Providing FHTC in Chakundi, Nabastha & Saligram village for 100% coverage in Sajal Gram from existing distribution system within NABASTHA PWSS, Bardhhaman-II Development Block under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000013/2023-2024 1728/BWD 13/04/2023 30 KAUSHIK RAY 23.96 23.87 99.62 100
4542 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of NABASTHA Piped Water Supply Scheme , SM/07864 Retrofitting Laying of interconnection between 4th tube well to OHR for Nabastha Water Supply Scheme within Burdhaman-II Block , under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. Junior Engineer, Burdwan Sadar Sub-Division ORD/000807/2022-2023 430/BSD 15/03/2023 30 D.M. ENTERPRISE 0.91 0.34 37.36 100
4543 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of NABASTHA Piped Water Supply Scheme , SM/07864 Retrofitting Preparation and Submission of DPR for Augmentation of Ground Water Based Piped Water Supply Scheme for NABASTHA, Block:Burdwan-II under Burdwan Division, P.H.E Dte. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000987/2024-2025 1908/BSD 28/08/2024 15 MEASURE LAND 0.78 0.00 0 0
4544 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of NABASTHA Piped Water Supply Scheme , SM/07864 Retrofitting Different type of works releted at head work side (Internal pathways , Land-Development, repair of pump house and drain) under Nabastha PWSS under Burdwan-II Block under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. Junior Engineer, Burdwan Sadar Sub-Division ORD/000291/2024-2025 1272/BSD 12/07/2024 173 M/S PALASH BISWAS 4.77 4.75 99.58 100
4545 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of NABASTHA Piped Water Supply Scheme , SM/07864 Retrofitting Providing FHTC for 100% coverage at Palsha (30 nos) & Begut (13nos) and special repairing of Nabastha, Begut & Palsha village for Nabastha Piped W/S scheme , Bardhhaman-II Dev. Block under Burdwan Division, PHE Dte" Gr.C. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. Junior Engineer, Burdwan Sadar Sub-Division ORD/000366/2022-2023 1405/BSD 10/08/2022 212 M/S ASHA CONSTRUCTION 4.71 0.00 0 100
4546 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of NABASTHA Piped Water Supply Scheme , SM/07864 Retrofitting FIXING OF DISPLAY BOARD WITH M.S STRUCTURE CONTAINING LAND DESCRIPTION AT NABASTA PWSS AND OTHER SCHEMES (57Nos) WITHIN BHATAR BLOCK UNDER BURDWAN DIVISION, PHE Dte. Junior Engineer1, Durgapur Sub-Division, PHE Dte. ORD/000948/2024-2025 1087/DSD 11/12/2024 15 SHANKHA GHOSH 3.70 0.00 0 100
4547 PURBA BARDHAMAN Burdwan Division Details Project Report on Providing Water Tap Connection in each School (1021 Nos) for 100% School Coverage from existing Distribution system within scheme jurisdiction of different Piped Water Supply Schemes within Purba Bardhaman District under Burdwan , SM/10378 School Providing leftout water tap connection in each school for 100 % school coverage from existing distribution system within scheme jurisdiction of different piped water supply schemes within Burdwan-I Block under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000689/2021-2022 6748/BWD 03/12/2021 15 DEBJYOTI GOSWAMI 4.84 1.04 21.49 0
4548 PURBA BARDHAMAN Burdwan Division Details Project Report on Providing Water Tap Connection in each School (1021 Nos) for 100% School Coverage from existing Distribution system within scheme jurisdiction of different Piped Water Supply Schemes within Purba Bardhaman District under Burdwan , SM/10378 School providing leftout water tap connection in each school for 100 % school coverage from existing distribution system within scheme jurisdiction of different piped water supply schemes within Purbasthali-I Block under Burdwan Division, PHE Dte.[Part-A] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000707/2021-2022 6738/BWD 03/12/2021 15 TAPAS KUMAR ROY 3.78 2.21 58.47 0
4549 PURBA BARDHAMAN Burdwan Division Details Project Report on Providing Water Tap Connection in each School (1021 Nos) for 100% School Coverage from existing Distribution system within scheme jurisdiction of different Piped Water Supply Schemes within Purba Bardhaman District under Burdwan , SM/10378 School Providing leftout water tap connection in each school for 100 % school coverage from existing distribution system within scheme jurisdiction of different piped water supply schemes within Kalna-I Block under Burdwan Division, PHE Dte.[SL-13] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000708/2021-2022 6752/BWD 03/12/2021 15 BISWAS ENTERPRISE 4.73 1.85 39.11 0
4550 PURBA BARDHAMAN Burdwan Division Details Project Report on Providing Water Tap Connection in each School (1021 Nos) for 100% School Coverage from existing Distribution system within scheme jurisdiction of different Piped Water Supply Schemes within Purba Bardhaman District under Burdwan , SM/10378 School Providing leftout water tap connection in each school for 100 % school coverage from existing distribution system within scheme jurisdiction of different piped water supply schemes within Purbasthali-II Block under Burdwan Division, PHE Dte.[Part-B][SL-27] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000710/2021-2022 6759/.BWD 03/12/2021 15 PARTHA PRATIM ACHARYA 4.71 2.79 59.24 0
4551 PURBA BARDHAMAN Burdwan Division Details Project Report on Providing Water Tap Connection in each School (1021 Nos) for 100% School Coverage from existing Distribution system within scheme jurisdiction of different Piped Water Supply Schemes within Purba Bardhaman District under Burdwan , SM/10378 School Providing leftout water tap connection in each school for 100 % school coverage from existing distribution system within scheme jurisdiction of different piped water supply schemes within Raina-I Block under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000706/2021-2022 6760/BWD 03/12/2021 15 POMPA CONSTRUCTION CO. 2.97 0.71 23.91 0
4552 PURBA BARDHAMAN Burdwan Division Details Project Report on Providing Water Tap Connection in each School (1021 Nos) for 100% School Coverage from existing Distribution system within scheme jurisdiction of different Piped Water Supply Schemes within Purba Bardhaman District under Burdwan , SM/10378 School Providing leftout water tap connection in each school for 100 % school coverage from existing distribution system within scheme jurisdiction of different piped water supply schemes within Kalna-II Block under Burdwan Division, PHE Dte.[sl-14] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000713/2021-2022 6753/BWD 03/12/2021 15 M/S UNIQUE 3.90 3.81 97.69 0
4553 PURBA BARDHAMAN Burdwan Division Details Project Report on Providing Water Tap Connection in each School (1021 Nos) for 100% School Coverage from existing Distribution system within scheme jurisdiction of different Piped Water Supply Schemes within Purba Bardhaman District under Burdwan , SM/10378 School Providing leftout water tap connection in each school for 100 % school coverage from existing distribution system within scheme jurisdiction of different piped water supply schemes within Katwa-I Block under Burdwan Division, PHE Dte.[sl-15] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000721/2021-2022 6754/BWD 03/12/2021 15 CHANCHAL PAL 2.06 1.00 48.54 0
4554 PURBA BARDHAMAN Burdwan Division Details Project Report on Providing Water Tap Connection in each School (1021 Nos) for 100% School Coverage from existing Distribution system within scheme jurisdiction of different Piped Water Supply Schemes within Purba Bardhaman District under Burdwan , SM/10378 School Providing leftout water tap connection in each school for 100 % school coverage from existing distribution system within scheme jurisdiction of different piped water supply schemes within Jamalpur Block under Burdwan Division, PHE Dte.[sl-03] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000722/2021-2022 6742/BWD 03/12/2021 15 ROY CONSTRUCTION 4.78 3.51 73.43 0
4555 PURBA BARDHAMAN Burdwan Division Details Project Report on Providing Water Tap Connection in each School (1021 Nos) for 100% School Coverage from existing Distribution system within scheme jurisdiction of different Piped Water Supply Schemes within Purba Bardhaman District under Burdwan , SM/10378 School Providing leftout water tap connection in each school for 100 % school coverage from existing distribution system within scheme jurisdiction of different piped water supply schemes within Katwa-II Block under Burdwan Division, PHE Dte.[sl-16] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000723/2021-2022 6755/BWD 03/12/2021 15 OM CONSTRUCTION 1.84 1.17 63.59 0
4556 PURBA BARDHAMAN Burdwan Division Details Project Report on Providing Water Tap Connection in each School (1021 Nos) for 100% School Coverage from existing Distribution system within scheme jurisdiction of different Piped Water Supply Schemes within Purba Bardhaman District under Burdwan , SM/10378 School Providing leftout water tap connection in each school for 100 % school coverage from existing distribution system within scheme jurisdiction of different piped water supply schemes within Memari-II Block under Burdwan Division, PHE Dte.[SL-23] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000729/2021-2022 6737/BWD 03/12/2021 15 M/S LOKE NIRMAN 1.39 1.04 74.82 0
4557 PURBA BARDHAMAN Burdwan Division Details Project Report on Providing Water Tap Connection in each School (1021 Nos) for 100% School Coverage from existing Distribution system within scheme jurisdiction of different Piped Water Supply Schemes within Purba Bardhaman District under Burdwan , SM/10378 School Providing leftout water tap connection in each school for 100 % school coverage from existing distribution system within scheme jurisdiction of different piped water supply schemes within Memari-I Block under Burdwan Division, PHE Dte.[SL-21] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000755/2021-2022 6735/BWD 03/12/2021 15 N.S. ENTERPRISE 3.89 1.31 33.68 0
4558 PURBA BARDHAMAN Burdwan Division Details Project Report on Providing Water Tap Connection in each School (1021 Nos) for 100% School Coverage from existing Distribution system within scheme jurisdiction of different Piped Water Supply Schemes within Purba Bardhaman District under Burdwan , SM/10378 School Providing leftout water tap connection in each school for 100 % school coverage from existing distribution system within scheme jurisdiction of different piped water supply schemes within Burdwan-II Block under Burdwan Division, PHE Dte. [SL NO.-10] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000753/2021-2022 6749/BWD 03/12/2021 15 GOUTAM KUMAR MITRA 2.42 2.04 84.3 0
4559 PURBA BARDHAMAN Burdwan Division Details Project Report on Providing Water Tap Connection in each School (1021 Nos) for 100% School Coverage from existing Distribution system within scheme jurisdiction of different Piped Water Supply Schemes within Purba Bardhaman District under Burdwan , SM/10378 School Providing leftout water tap connection in each school for 100 % school coverage from existing distribution system within scheme jurisdiction of different piped water supply schemes within Khandaghosh Block under Burdwan Division, PHE Dte.[SL-20] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000756/2021-2022 6734/BWD 03/12/2021 15 SOUMYAVASH DAS 3.33 2.47 74.17 0
4560 PURBA BARDHAMAN Burdwan Division Details Project Report on Providing Water Tap Connection in each School (1021 Nos) for 100% School Coverage from existing Distribution system within scheme jurisdiction of different Piped Water Supply Schemes within Purba Bardhaman District under Burdwan , SM/10378 School Providing leftout water tap connection in each school for 100 % school coverage from existing distribution system within scheme jurisdiction of different piped water supply schemes within Jamalpur Block under Burdwan Division, PHE Dte.[SL-04] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000758/2021-2022 6743/BWD 03/12/2021 15 ROY BISWAS CONSTRUCTION 4.72 2.67 56.57 0
4561 PURBA BARDHAMAN Burdwan Division Details Project Report on Providing Water Tap Connection in each School (1021 Nos) for 100% School Coverage from existing Distribution system within scheme jurisdiction of different Piped Water Supply Schemes within Purba Bardhaman District under Burdwan , SM/10378 School Providing leftout water tap connection in each school for 100 % school coverage from existing distribution system within scheme jurisdiction of different piped water supply schemes within Bhatar Block under Burdwan Division, PHE Dte.[SL-08] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000759/2021-2022 6747/BWD 03/12/2021 15 DEEPAK ENTERPRISE 4.47 0.59 13.2 0
4562 PURBA BARDHAMAN Burdwan Division Details Project Report on Providing Water Tap Connection in each School (1021 Nos) for 100% School Coverage from existing Distribution system within scheme jurisdiction of different Piped Water Supply Schemes within Purba Bardhaman District under Burdwan , SM/10378 School Providing leftout water tap connection in each school for 100 % school coverage from existing distribution system within scheme jurisdiction of different piped water supply schemes within Memari-I Block under Burdwan Division, PHE Dte.[SL-22] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000761/2021-2022 6736/BWD 03/12/2021 15 A R TRADERS 4.01 1.74 43.39 0
4563 PURBA BARDHAMAN Burdwan Division Details Project Report on Providing Water Tap Connection in each School (1021 Nos) for 100% School Coverage from existing Distribution system within scheme jurisdiction of different Piped Water Supply Schemes within Purba Bardhaman District under Burdwan , SM/10378 School Providing leftout water tap connection in each school for 100 % school coverage from existing distribution system within scheme jurisdiction of different piped water supply schemes within Monteswar Block under Burdwan Division, PHE Dte.[SL-22] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000762/2021-2022 6733/BWD 03/12/2021 15 PRONAB KUMAR DEY 4.01 2.29 57.11 0
4564 PURBA BARDHAMAN Burdwan Division Details Project Report on Providing Water Tap Connection in each School (1021 Nos) for 100% School Coverage from existing Distribution system within scheme jurisdiction of different Piped Water Supply Schemes within Purba Bardhaman District under Burdwan , SM/10378 School Providing leftout water tap connection in each school for 100 % school coverage from existing distribution system within scheme jurisdiction of different piped water supply schemes within Ausgram-II Block under Burdwan Division, PHE Dte.[SL-06] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000771/2021-2022 6745/BWD 03/12/2021 15 TARAMA AGENCY 2.42 0.42 17.36 0
4565 PURBA BARDHAMAN Burdwan Division Details Project Report on Providing Water Tap Connection in each School (1021 Nos) for 100% School Coverage from existing Distribution system within scheme jurisdiction of different Piped Water Supply Schemes within Purba Bardhaman District under Burdwan , SM/10378 School Providing leftout water tap connection in each school for 100 % school coverage from existing distribution system within scheme jurisdiction of different piped water supply schemes within Purbasthali-II Block under Burdwan Division, PHE Dte. [Part-A][SL-26] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000782/2021-2022 6758/BWD 03/12/2021 15 MOYAZZEM CONSTRUCTION 4.67 2.07 44.33 0
4566 PURBA BARDHAMAN Burdwan Division Details Project Report on Providing Water Tap Connection in each School (1021 Nos) for 100% School Coverage from existing Distribution system within scheme jurisdiction of different Piped Water Supply Schemes within Purba Bardhaman District under Burdwan , SM/10378 School Providing leftout water tap connection in each school for 100 % school coverage from existing distribution system within scheme jurisdiction of different piped water supply schemes within Galsi-I Block under Burdwan Division, PHE Dte.[SL-11] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000788/2021-2022 6750/BWD 03/12/2021 15 PAPRI HAZRA 4.67 2.33 49.89 0
4567 PURBA BARDHAMAN Burdwan Division Details Project Report on Providing Water Tap Connection in each School (1021 Nos) for 100% School Coverage from existing Distribution system within scheme jurisdiction of different Piped Water Supply Schemes within Purba Bardhaman District under Burdwan , SM/10378 School Providing leftout water tap connection in each school for 100 % school coverage from existing distribution system within scheme jurisdiction of different piped water supply schemes within Jamalpur Block under Burdwan Division, PHE Dte. [Part-A][Sl-01] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000789/2021-2022 6740/BWD 03/12/2021 15 MUKHERJEE ENTERPRISE 4.77 2.85 59.75 0
4568 PURBA BARDHAMAN Burdwan Division Details Project Report on Providing Water Tap Connection in each School (1021 Nos) for 100% School Coverage from existing Distribution system within scheme jurisdiction of different Piped Water Supply Schemes within Purba Bardhaman District under Burdwan , SM/10378 School Providing leftout water tap connection in each school for 100 % school coverage from existing distribution system within scheme jurisdiction of different piped water supply scheme within Jamalpur Block under Burdwan Division, PHE Dte. [Part-B] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000791/2021-2022 674/BWD 03/12/2021 15 KAJAL MUKHERJEE 4.77 1.84 38.57 0
4569 PURBA BARDHAMAN Burdwan Division Details Project Report on Providing Water Tap Connection in each School (1021 Nos) for 100% School Coverage from existing Distribution system within scheme jurisdiction of different Piped Water Supply Schemes within Purba Bardhaman District under Burdwan , SM/10378 School Providing leftout water tap connection in each school for 100 % school coverage from existing distribution system within scheme jurisdiction of different piped water supply schemes within Mongalkote Block under Burdwan Division, PHE Dte.[SL-30] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000811/2021-2022 6762/BWD 03/12/2021 15 ASMA ENTERPRISE 3.45 2.71 78.55 0
4570 PURBA BARDHAMAN Burdwan Division Details Project Report on Providing Water Tap Connection in each School (1021 Nos) for 100% School Coverage from existing Distribution system within scheme jurisdiction of different Piped Water Supply Schemes within Purba Bardhaman District under Burdwan , SM/10378 School Providing leftout water tap connection in each school for 100 % school coverage from existing distribution system within scheme jurisdiction of different piped water supply schemes within Ketugram-II Block under Burdwan Division, PHE Dte.[SL-18] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000709/2021-2022 6757/BWD 03/12/2021 15 ABDUL HAI 2.97 2.67 89.9 0
4571 PURBA BARDHAMAN Burdwan Division Details Project Report on Providing Water Tap Connection in each School (1021 Nos) for 100% School Coverage from existing Distribution system within scheme jurisdiction of different Piped Water Supply Schemes within Purba Bardhaman District under Burdwan , SM/10378 School Providing leftout water tap connection in each school for 100 % school coverage from existing distribution system within scheme jurisdiction of different piped water supply schemes within Purbasthali-I Block under Burdwan Division, PHE Dte.[Part-B][SL-25] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000705/2021-2022 6759/BWD 03/12/2021 15 M/S SAYAN CHAKRABORTY 3.79 2.29 60.42 0
4572 PURBA BARDHAMAN Burdwan Division Details Project Report on Providing Water Tap Connection in each School (1021 Nos) for 100% School Coverage from existing Distribution system within scheme jurisdiction of different Piped Water Supply Schemes within Purba Bardhaman District under Burdwan , SM/10378 School Providing leftout water tap connection in each school for 100 % school coverage from existing distribution system within the scheme jurisdiction of different piped water supply schemes within Ketugram-I Block under Burdwan Division, PHE Dte. [SL-17] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000931/2021-2022 6756/BWD 03/12/2021 15 DULU MIDDA 4.71 4.07 86.41 100
4573 PURBA BARDHAMAN Jamalpur Burdwan Division GROUND WATER BASED KALERA PIPED WATER SUPPLY SCHEME JAMALPUR BLOCK PURBA BARDHAMAN , SM/11491 New Material Requisition To Resource Division RTOR000053/2022-2023 5522/BWDQ 23/12/2022 Resource Division 8.88 0.00 0 0
4574 PURBA BARDHAMAN Jamalpur Central Mechanical GROUND WATER BASED KALERA PIPED WATER SUPPLY SCHEME JAMALPUR BLOCK PURBA BARDHAMAN , SM/11491 New New Service Connection Charges for Kalera W/S Scheme PH-1 BILL/00002/2022-2023 25 02/01/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 4.51 0.00 0 0
4575 PURBA BARDHAMAN Jamalpur Central Mechanical GROUND WATER BASED KALERA PIPED WATER SUPPLY SCHEME JAMALPUR BLOCK PURBA BARDHAMAN , SM/11491 New New Service Connection Charges for Kalera W/S Scheme PH-2 BILL/00003/2022-2023 26 02/01/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 5.90 0.00 0 0
4576 PURBA BARDHAMAN Jamalpur Central Drilling GROUND WATER BASED KALERA PIPED WATER SUPPLY SCHEME JAMALPUR BLOCK PURBA BARDHAMAN , SM/11491 New PROVIDING DRILLING CREWS FOR CONSTRUCTION OF TUBE WELL (250MM X 150MM) BY DEPARTMENTAL RIG MACHINE FOR KALERA W/S (TW-I) SCH, JAMALPUR BLOCK UNDER PURBA BARDHAMAN, CDD, PHE DTE. ORD/000288/2022-2023 319/CMSD-I 21/07/2022 15 C.M. ENTERPRISE 1.74 1.74 100 1
4577 PURBA BARDHAMAN Jamalpur Central Drilling GROUND WATER BASED KALERA PIPED WATER SUPPLY SCHEME JAMALPUR BLOCK PURBA BARDHAMAN , SM/11491 New PROVIDING TUBE WELL MATERIALS CONFORMING TO IS: 12818:2010 WITH OTHER WORKS AT SITE FOR CONSTRUCTION OF TUBE WELL AT KALERA W/S (TW-I) SCH, JAMALPUR BLOCK UNDER PURBA BARDHAMAN, CDD, PHE DTE. ORD/000289/2022-2023 316/CMSD-I 22/07/2022 15 C.M. ENTERPRISE 3.28 3.22 98.17 1
4578 PURBA BARDHAMAN Jamalpur Central Drilling GROUND WATER BASED KALERA PIPED WATER SUPPLY SCHEME JAMALPUR BLOCK PURBA BARDHAMAN , SM/11491 New PROVIDING TUBE WELL MATERIALS CONFORMING TO IS: 12818:2010 WITH OTHER WORKS AT SITE FOR CONSTRUCTION OF TUBE WELL AT KALERA W/S SCH (TW-II) SCH, JAMALPUR BLOCK UNDER PURBA BARDHAMAN, CDD, PHE DTE. ORD/000290/2022-2023 317/CMSD-I 22/07/2022 15 C.M. ENTERPRISE 3.28 3.12 95.12 1
4579 PURBA BARDHAMAN Jamalpur Central Drilling GROUND WATER BASED KALERA PIPED WATER SUPPLY SCHEME JAMALPUR BLOCK PURBA BARDHAMAN , SM/11491 New PROVIDING PEA SIZE GRAVELS AND BENTONITE POWDER SODIUM BASED AT SITE WITH OTHER WORKS FOR CONSTRUCTION OF TUBE WELL AT KELERA W/S (TW-I) SCHEME, JAMALPUR BLOCK UNDER PURBA BARDHAMAN, CDD, PHE DTE. ORD/000287/2022-2023 320/CMSD-I 21/07/2022 15 C.M. ENTERPRISE 1.88 1.19 63.3 1
4580 PURBA BARDHAMAN Jamalpur Central Drilling GROUND WATER BASED KALERA PIPED WATER SUPPLY SCHEME JAMALPUR BLOCK PURBA BARDHAMAN , SM/11491 New PROVIDING PEA SIZE GRAVELS AND BENTONITE POWDER SODIUM BASED AT SITE WITH OTHER WORKS FOR CONSTRUCTION OF TUBE WELL AT KALERA W/S SCH (TW-II) SCH, JAMALPUR BLOCK UNDER PURBA BARDHAMAN, CDD, PHE DTE. ORD/000292/2022-2023 331/CMSD-I 15/07/2022 15 C.M. ENTERPRISE 1.88 1.16 61.7 1
4581 PURBA BARDHAMAN Jamalpur Central Drilling GROUND WATER BASED KALERA PIPED WATER SUPPLY SCHEME JAMALPUR BLOCK PURBA BARDHAMAN , SM/11491 New Additional Transportation of Departmental rig unit no. Super RR with compressor and pump unit from Kalera PWSS under CDD, PHE dte. Driller In Charge Junior Engineer ORD/000307/2022-2023 532/CMSD-II(D) 01/12/2022 7 PADMA ENGINEERING & CO. 0.75 0.75 100 1
4582 PURBA BARDHAMAN Jamalpur Central Drilling GROUND WATER BASED KALERA PIPED WATER SUPPLY SCHEME JAMALPUR BLOCK PURBA BARDHAMAN , SM/11491 New Providing drilling crews for construction of TW (250mm x 150mm) by Departmental rig machine for kalera WS (TW-II), Jamalpur block purba Burdwan, CDD, PHE Dte. ORD/000308/2022-2023 330/CMSD-I(D) 15/07/2022 15 C.M. ENTERPRISE 1.74 1.38 79.31 1
4583 PURBA BARDHAMAN Jamalpur Burdwan Division GROUND WATER BASED KALERA PIPED WATER SUPPLY SCHEME JAMALPUR BLOCK PURBA BARDHAMAN , SM/11491 New Material Requisition To Resource Division RTOR000118/2023-2024 2155/BWD 10/05/2023 Resource Division 12.90 0.00 0 0
4584 PURBA BARDHAMAN Jamalpur Central Mechanical GROUND WATER BASED KALERA PIPED WATER SUPPLY SCHEME JAMALPUR BLOCK PURBA BARDHAMAN , SM/11491 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 at Kalera Water Supply Scheme [ Block- Jamalpur ] under CMD, PHE Dte., Dist.- Purba-Bardhaman ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000609/2022-2023 3115/CMD 23/11/2022 30 P.K. ENGINEERING 11.07 10.73 96.93 80
4585 PURBA BARDHAMAN Jamalpur Central Mechanical GROUND WATER BASED KALERA PIPED WATER SUPPLY SCHEME JAMALPUR BLOCK PURBA BARDHAMAN , SM/11491 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-2 at Kalera Water Supply Scheme [ Block- Jamalpur ] under CMD, PHE Dte., Dist.- Purba-Bardhaman ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000610/2022-2023 3116/CMD 23/11/2022 30 DUTTA ENTERPRISE 11.08 7.74 69.86 80
4586 PURBA BARDHAMAN Jamalpur Central Drilling GROUND WATER BASED KALERA PIPED WATER SUPPLY SCHEME JAMALPUR BLOCK PURBA BARDHAMAN , SM/11491 New Hiring of Diesel driven motor cab (BS-III & above) having contract carriage permit along with driver for the office of the Executive Engineer, CDD, PHE Dte. Assistant Engineer Junior Engineer ORD/000004/2023-2024 45/S&WSD 26/04/2023 7 ASHUTOSH DAS & CO 0.87 1.43 164.37 83
4587 PURBA BARDHAMAN Jamalpur Burdwan Division GROUND WATER BASED KALERA PIPED WATER SUPPLY SCHEME JAMALPUR BLOCK PURBA BARDHAMAN , SM/11491 New Augmentation of KALERA Piped Water Supply Scheme with LDS, FHTC, Rising main, Construction of 350 cum capacity OHR with 20.0 mtr. Staging height inclusive of soil investigation including construction of switch-rooms(5.40mx3.6m) & Boundary walls for new TW site under Jamalpur Block, District:- Purba-Burdwan. [Treated as "New Scheme in place of Augmentation" vide Corrigendum Notice No. 1544/CC, dated 02.08.2022.] AE(HQs) Junior Engineer, Burdwan Division ORD/000256/2022-2023 3855/BWD 07/09/2022 846 M/S MAA TARA CONSTRUCTION 302.71 129.08 42.64 100
4588 PURBA BARDHAMAN Burdwan Division Providing Water Supply Arrangement by Sinking of Tube Well at leftout Primary Schools(359 nos) for 100% School Coverage in Purba Bardhaman within Burdwan South Sub Division under Burdwan Division P.H.E. DTE. , SM/11285 School Material Requisition To Resource Division RTOR000051/2022-2023 5399/BWD 12/12/2022 Resource Division 85.00 0.00 0 0
4589 PURBA BARDHAMAN Burdwan Division Providing Water Supply Arrangement by Sinking of Tube Well at leftout Primary Schools(359 nos) for 100% School Coverage in Purba Bardhaman within Burdwan South Sub Division under Burdwan Division P.H.E. DTE. , SM/11285 School Sinking of 100mtr. deep 100 × 40mm tubewell for providing water supply arrangement in Schools under Raina ¿ II Block (34 Nos School) within Purba Bardhaman District under Burdwan Division, PHE Dte. (Part-A). Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000281/2022-2023 3612/BWD 18/08/2022 45 HAFIJUR RAHAMAN MIDYA 43.97 26.45 60.15 0
4590 PURBA BARDHAMAN Burdwan Division Providing Water Supply Arrangement by Sinking of Tube Well at leftout Primary Schools(359 nos) for 100% School Coverage in Purba Bardhaman within Burdwan South Sub Division under Burdwan Division P.H.E. DTE. , SM/11285 School Sinking of 100mtr. deep 100 × 40mm tubewell for providing water supply arrangement in Schools under Burdwan-II Block (28 Nos School) within Purba Bardhaman District under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000195/2022-2023 3414/BWD 05/08/2022 45 G.S. CONSTRUCTION & CO. 31.49 27.19 86.34 0
4591 PURBA BARDHAMAN Burdwan Division Providing Water Supply Arrangement by Sinking of Tube Well at leftout Primary Schools(359 nos) for 100% School Coverage in Purba Bardhaman within Burdwan South Sub Division under Burdwan Division P.H.E. DTE. , SM/11285 School Sinking of 100mtr. deep 100 × 40mm tubewell for providing water supply arrangement in Schools under Burdwan-I Block (37 Nos School) within Purba Bardhaman District under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000196/2022-2023 3419/BWD 05/08/2022 45 P.C. CONSTRUCTION 41.51 35.48 85.47 0
4592 PURBA BARDHAMAN Burdwan Division Providing Water Supply Arrangement by Sinking of Tube Well at leftout Primary Schools(359 nos) for 100% School Coverage in Purba Bardhaman within Burdwan South Sub Division under Burdwan Division P.H.E. DTE. , SM/11285 School Sinking of 100mtr. deep 100 × 40mm tubewell for providing water supply arrangement in Schools under Khandaghosh Block (43 Nos School) within Purba Bardhaman District under Burdwan Division, PHE Dte. (Part-A). Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000343/2022-2023 3690/BWD 29/08/2022 45 SHUBHRA KANTI GHOSH 48.43 42.33 87.4 0
4593 PURBA BARDHAMAN Burdwan Division Providing Water Supply Arrangement by Sinking of Tube Well at leftout Primary Schools(359 nos) for 100% School Coverage in Purba Bardhaman within Burdwan South Sub Division under Burdwan Division P.H.E. DTE. , SM/11285 School Sinking of 100mtr. deep 100 × 40mm tubewell for providing water supply arrangement in Schools under Jamalpur Block (05 Nos School) within Purba Bardhaman District under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000279/2022-2023 3588/BWD 17/08/2022 15 UDYOG CONSTRUCTION 4.72 4.41 93.43 0
4594 PURBA BARDHAMAN Burdwan Division Providing Water Supply Arrangement by Sinking of Tube Well at leftout Primary Schools(359 nos) for 100% School Coverage in Purba Bardhaman within Burdwan South Sub Division under Burdwan Division P.H.E. DTE. , SM/11285 School Sinking of 100mtr. deep 100 × 40mm tubewell for providing water supply arrangement in Schools under Raina I Block (33 Nos School) within Purba Bardhaman District under Burdwan Division, PHE Dte. (Part-B). Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000193/2022-2023 3416/BWD 05/08/2022 45 THREE MAA ENTERPRISE 36.46 30.34 83.21 0
4595 PURBA BARDHAMAN Burdwan Division Providing Water Supply Arrangement by Sinking of Tube Well at leftout Primary Schools(359 nos) for 100% School Coverage in Purba Bardhaman within Burdwan South Sub Division under Burdwan Division P.H.E. DTE. , SM/11285 School Sinking of 100mtr. deep 100 × 40mm tubewell for providing water supply arrangement in Schools under Raina II Block (39 Nos School) within Purba Bardhaman District under Burdwan Division, PHE Dte. (Part-B). Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000301/2022-2023 3634/BWD 23/08/2022 45 PREMANANDA ROY BISWAS 43.83 41.05 93.66 0
4596 PURBA BARDHAMAN Burdwan Division Providing Water Supply Arrangement by Sinking of Tube Well at leftout Primary Schools(359 nos) for 100% School Coverage in Purba Bardhaman within Burdwan South Sub Division under Burdwan Division P.H.E. DTE. , SM/11285 School Sinking of 100mtr. deep 100 × 40mm tubewell for providing water supply arrangement in Schools under Raina I Block (34 Nos School) within Purba Bardhaman District under Burdwan Division, PHE Dte. (Part-A)_2ND CALL. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000329/2022-2023 3673/BWD 29/08/2022 45 MOTI RAHAMAN 37.97 27.67 72.87 0
4597 PURBA BARDHAMAN Burdwan Division Providing Water Supply Arrangement by Sinking of Tube Well at leftout Primary Schools(359 nos) for 100% School Coverage in Purba Bardhaman within Burdwan South Sub Division under Burdwan Division P.H.E. DTE. , SM/11285 School Sinking of 100mtr. deep 100 × 40mm tubewell for providing water supply arrangement in Schools under Memari ¿ I Block (17 Nos School) within Purba Bardhaman District under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000191/2022-2023 3415/BWD 05/08/2022 30 DIPAYAN DEY 17.85 14.90 83.47 100
4598 PURBA BARDHAMAN Burdwan Division Providing Water Supply Arrangement by Sinking of Tube Well at leftout Primary Schools(359 nos) for 100% School Coverage in Purba Bardhaman within Burdwan South Sub Division under Burdwan Division P.H.E. DTE. , SM/11285 School Sinking of 100mtr. deep 100 × 40mm tubewell for providing water supply arrangement in Schools under Khandaghosh Block (43 Nos School) within Purba Bardhaman District under Burdwan Division, PHE Dte. (Part-B). Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000302/2022-2023 3666/BWD 29/08/2022 45 M/S LOKE NIRMAN 48.38 29.13 60.21 100
4599 PURBA BARDHAMAN Burdwan Division Providing Water Supply Arrangement by Sinking of Tube Well at leftout Primary Schools(359 nos) for 100% School Coverage in Purba Bardhaman within Burdwan South Sub Division under Burdwan Division P.H.E. DTE. , SM/11285 School Material Requisition To Resource Division RTOR000023/2022-2023 3298/BWD 29/07/2022 Resource Division 90.49 0.00 0 0
4600 PURBA BARDHAMAN Burdwan Division Providing Water Supply Arrangement by Sinking of Tube Well at leftout Primary Schools(359 nos) for 100% School Coverage in Purba Bardhaman within Burdwan South Sub Division under Burdwan Division P.H.E. DTE. , SM/11285 School Sinking of 100mtr. deep 100 × 40mm tubewell for providing water supply arrangement in Schools under Memari II Block (41 Nos School) within Purba Bardhaman District under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000300/2022-2023 3636/BWD 23/08/2022 45 BRINDABAN KONAR 46.23 31.24 67.58 100
4601 PURBA BARDHAMAN Bhatar Burdwan Division KHURUL PIPED WATER SUPPLY SCHEME , SM/13549 New Material Requisition To Resource Division RTOR000003/2023-2024 1962/BWD 25/04/2023 Resource Division 23.91 0.00 0 0
4602 PURBA BARDHAMAN Bhatar Burdwan Division KHURUL PIPED WATER SUPPLY SCHEME , SM/13549 New Material Requisition To Resource Division RTOR000386/2023-2024 2197/BWD 12/05/2023 Resource Division 6.52 0.00 0 0
4603 PURBA BARDHAMAN Bhatar Burdwan Division KHURUL PIPED WATER SUPPLY SCHEME , SM/13549 New Material Requisition To Resource Division RTOR000606/2023-2024 4911/BWD 10/11/2023 Resource Division 32.92 0.00 0 0
4604 PURBA BARDHAMAN Bhatar Central Mechanical KHURUL PIPED WATER SUPPLY SCHEME , SM/13549 New NEW SERVICE CONNECTION FOR KHURUL PIPED WATER SUPPLY SCHEME. BILL/02831/2023-2024 BP-2023-24-588 04/03/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.72 0.00 0 0
4605 PURBA BARDHAMAN Bhatar Central Mechanical KHURUL PIPED WATER SUPPLY SCHEME , SM/13549 New NEW SERVICE CONNECTION FOR KHURUL PIPED WATER SUPPLY SCHEME. BILL/02832/2023-2024 BP-2023-24-589 04/03/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.45 0.00 0 0
4606 PURBA BARDHAMAN Bhatar Central Mechanical KHURUL PIPED WATER SUPPLY SCHEME , SM/13549 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at KHURUL Water Supply Scheme [ Block- BHATAR ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000803/2023-2024 4089/CMD 29/08/2023 30 M/S, S.S. ENTERPRISE. 27.79 0.00 0 60
4607 PURBA BARDHAMAN Bhatar Central Mechanical KHURUL PIPED WATER SUPPLY SCHEME , SM/13549 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Karjana & others water supply scheme under Bhatar Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000067/2024-2025 2394/CMD 02/08/2024 90 AHALYA ENGINEERING WORKS 82.00 0.00 0 0
4608 PURBA BARDHAMAN Bhatar Burdwan Division KHURUL PIPED WATER SUPPLY SCHEME , SM/13549 New KHURUL Piped Water Supply Scheme with sinking of Tube-well, LDS, Rising Main, FHTC, construction of switch rooms & boundary walls with gates and land development, drain and internal pathway at different TW site under Bhatar Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer1, Durgapur Sub-Division, PHE Dte.,Junior Engineer2, Durgapur Sub-Division, PHE Dte. ORD/000926/2023-2024 5480/BWD 13/12/2023 476 INDIAN ENGINEERS CO.-OPERATIVE SOCIETY LTD. 182.02 0.00 0 65
4609 PURBA BARDHAMAN Manteswar Burdwan Division GROUND WATER SUPPLY BASED PIPED WATER SUPPLY SCHEME FOR SUTRA PWSS IN MANTESHWAR BLOCK OF PURBA BURDWAN DISTRICT UNDER BURDWAN DIVISION, P.H.E. DTE. , SM/13280 New Material Requisition To Resource Division RTOR000090/2022-2023 1243/BWD 17/03/2023 Resource Division 10.30 0.00 0 0
4610 PURBA BARDHAMAN Manteswar Burdwan Division GROUND WATER SUPPLY BASED PIPED WATER SUPPLY SCHEME FOR SUTRA PWSS IN MANTESHWAR BLOCK OF PURBA BURDWAN DISTRICT UNDER BURDWAN DIVISION, P.H.E. DTE. , SM/13280 New Material Requisition To Resource Division RTOR000101/2022-2023 1632/BWD 06/04/2023 Resource Division 11.55 0.00 0 0
4611 PURBA BARDHAMAN Manteswar Central Mechanical GROUND WATER SUPPLY BASED PIPED WATER SUPPLY SCHEME FOR SUTRA PWSS IN MANTESHWAR BLOCK OF PURBA BURDWAN DISTRICT UNDER BURDWAN DIVISION, P.H.E. DTE. , SM/13280 New New service connection charges for Sutra PWSS TW-1 BILL/00792/2023-2024 BP-2023-24-80 25/07/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 2.89 0.00 0 0
4612 PURBA BARDHAMAN Manteswar Central Mechanical GROUND WATER SUPPLY BASED PIPED WATER SUPPLY SCHEME FOR SUTRA PWSS IN MANTESHWAR BLOCK OF PURBA BURDWAN DISTRICT UNDER BURDWAN DIVISION, P.H.E. DTE. , SM/13280 New New service connection charges for Sutra PWSS TW-2 BILL/00793/2023-2024 BP-2023-24-81 25/07/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.84 0.00 0 0
4613 PURBA BARDHAMAN Manteswar Burdwan Division GROUND WATER SUPPLY BASED PIPED WATER SUPPLY SCHEME FOR SUTRA PWSS IN MANTESHWAR BLOCK OF PURBA BURDWAN DISTRICT UNDER BURDWAN DIVISION, P.H.E. DTE. , SM/13280 New Material Requisition To Resource Division RTOR000618/2023-2024 4885/BWD 10/11/2023 Resource Division 33.21 0.00 0 0
4614 PURBA BARDHAMAN Manteswar Central Mechanical GROUND WATER SUPPLY BASED PIPED WATER SUPPLY SCHEME FOR SUTRA PWSS IN MANTESHWAR BLOCK OF PURBA BURDWAN DISTRICT UNDER BURDWAN DIVISION, P.H.E. DTE. , SM/13280 New SUPPLY & INSTALLATION WORKS FOR SUTRA PWSS BILL/02623/2023-2024 BP-2023-24-558 21/02/2024 M.S. ENTERPRISE 21.99 0.00 0 0
4615 PURBA BARDHAMAN Manteswar Central Mechanical GROUND WATER SUPPLY BASED PIPED WATER SUPPLY SCHEME FOR SUTRA PWSS IN MANTESHWAR BLOCK OF PURBA BURDWAN DISTRICT UNDER BURDWAN DIVISION, P.H.E. DTE. , SM/13280 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at Sutra Water Supply Scheme [ Block- Monteswar ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000185/2023-2024 2967/CMD 17/07/2023 30 M.S. ENTERPRISE 27.67 0.00 0 100
4616 PURBA BARDHAMAN Manteswar Burdwan Division GROUND WATER SUPPLY BASED PIPED WATER SUPPLY SCHEME FOR SUTRA PWSS IN MANTESHWAR BLOCK OF PURBA BURDWAN DISTRICT UNDER BURDWAN DIVISION, P.H.E. DTE. , SM/13280 New SUTRA Piped Water Supply Scheme with sinking of Tube-well, LDS, Rising Main, FHTC, Construction of 250 cum capacity RCC OHR with 20.0 mtr. with Staging height including soil investigation & construction of switch-rooms & boundary walls at different TW site under Monteswar Block, District:- Purba-Bardhaman [NEW SCHEME]_2ND CALL Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000743/2022-2023 1166/BWD 14/03/2023 365 B.B.C. ENTERPRISE 404.06 213.76 52.9 70
4617 PURBA BARDHAMAN Manteswar Burdwan Division GROUND WATER SUPPLY BASED PIPED WATER SUPPLY SCHEME FOR SUTRA PWSS IN MANTESHWAR BLOCK OF PURBA BURDWAN DISTRICT UNDER BURDWAN DIVISION, P.H.E. DTE. , SM/13280 New Laying of additional pipeline and providing FHTC at SUTRA water supply scheme under Kalna Sub-Division, Burdwan Division, PHE Dte. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000157/2024-2025 2175/BWD 12/06/2024 120 DUBE ENTERPRISE 42.09 8.53 20.27 40
4618 PURBA BARDHAMAN Manteswar Burdwan Division GROUND WATER SUPPLY BASED PIPED WATER SUPPLY SCHEME FOR SUTRA PWSS IN MANTESHWAR BLOCK OF PURBA BURDWAN DISTRICT UNDER BURDWAN DIVISION, P.H.E. DTE. , SM/13280 New Balance work for laying of pipeline, providing FHTC & other allied works in connection with Augmentation of MONTESWAR PWSS & SUTRA PWSS (SM/13280) under Kalna Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000980/2024-2025 3572/BWD 27/09/2024 181 BAKSHI ENTERPRISE 51.14 0.00 0 30
4619 PURBA BARDHAMAN Manteswar Central Mechanical GROUND WATER SUPPLY BASED PIPED WATER SUPPLY SCHEME FOR SUTRA PWSS IN MANTESHWAR BLOCK OF PURBA BURDWAN DISTRICT UNDER BURDWAN DIVISION, P.H.E. DTE. , SM/13280 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Sutra & others water supply scheme under Monteswar Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000068/2024-2025 2396/CMD 02/08/2024 455 SINHA ELECTRICALS 78.06 0.00 0 20
4620 PURBA BARDHAMAN Raina - II Burdwan Division CHAK CHANDAN PIPED WATER SUPPLY SCHEME , SM/13281 New Material Requisition To Resource Division RTOR000267/2023-2024 1898/BWD 12/05/2023 Resource Division 11.69 0.00 0 0
4621 PURBA BARDHAMAN Raina - II Burdwan Division CHAK CHANDAN PIPED WATER SUPPLY SCHEME , SM/13281 New Material Requisition To Resource Division RTOR000504/2023-2024 4028/BWD 08/09/2023 Resource Division 8.29 0.00 0 0
4622 PURBA BARDHAMAN Raina - II Burdwan Division CHAK CHANDAN PIPED WATER SUPPLY SCHEME , SM/13281 New Material Requisition To Resource Division RTOR000660/2023-2024 5118/BWD 23/11/2023 Resource Division 20.46 0.00 0 0
4623 PURBA BARDHAMAN Raina - II Central Mechanical CHAK CHANDAN PIPED WATER SUPPLY SCHEME , SM/13281 New New service connection charges for Chak Chandan PWSS TW-1 BILL/01667/2023-2024 BP-2023-24-220 10/11/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 4.07 0.00 0 0
4624 PURBA BARDHAMAN Raina - II Central Mechanical CHAK CHANDAN PIPED WATER SUPPLY SCHEME , SM/13281 New New electric connection for Chakchandan PWSS, PH-2. BILL/01874/2023-2024 BP-2023-24-340 11/01/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 4.49 0.00 0 0
4625 PURBA BARDHAMAN Raina - II Central Mechanical CHAK CHANDAN PIPED WATER SUPPLY SCHEME , SM/13281 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Satinandi,Sanko & others water supply scheme under Galsi-1 Block ; Serpur, Uchalan & others water supply scheme under Raina-2 Block and maro, loapur & others water supply scheme under Galsi-2 block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000397/2024-2025 2751/CMD 24/09/2024 90 ORIENTAL ENGINEERING CO. 88.42 0.00 0 0
4626 PURBA BARDHAMAN Raina - II Central Mechanical CHAK CHANDAN PIPED WATER SUPPLY SCHEME , SM/13281 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at Chak Chandan Water Supply Scheme [ Block- Raina-2 ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000726/2023-2024 4037/CMD 29/08/2023 30 M/S. S.R. ENTERPRISE 28.98 0.00 0 96
4627 PURBA BARDHAMAN Raina - II Central Mechanical CHAK CHANDAN PIPED WATER SUPPLY SCHEME , SM/13281 New Emergency installation (for urgent FHTC) at Chak Chandan Water Supply Scheme PH 1 (part-3) under CMD, PHE Dte., Dist.- Purba-Bardhaman ASSISTANT ENGINEER JUNIOR ENGINEER ORD/001675/2023-2024 82/CMSD 15/01/2024 12 CHOUDHURY ENTERPRISE 0.88 0.88 100 100
4628 PURBA BARDHAMAN Raina - II Burdwan Division CHAK CHANDAN PIPED WATER SUPPLY SCHEME , SM/13281 New Different works related (sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of different capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site) to UCHALAN, CHAK CHANDAN, SERPUR & KATNABIL Piped Water Supply Scheme under Raina II Block, District:- Purba Bardhaman [NEW SCHEME] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000367/2023-2024 3076/BWD 18/07/2023 806 SK ALIM 1,307.56 47.10 3.6 40
4629 PURBA BARDHAMAN Raina - II Central Mechanical CHAK CHANDAN PIPED WATER SUPPLY SCHEME , SM/13281 New Supply and delivery of submersible pumping machinery (for urgent FHTC) for Chak Chandan Water Supply Scheme PH 1 (part-2) under CMD, PHE Dte., Dist.- Purba-Bardhaman ASSISTANT ENGINEER JUNIOR ENGINEER ORD/001671/2023-2024 65/CMSD 11/01/2024 12 CHOUDHURY ENTERPRISE 0.86 0.86 100 100
4630 PURBA BARDHAMAN Raina - II Central Mechanical CHAK CHANDAN PIPED WATER SUPPLY SCHEME , SM/13281 New Delivery of different Electro-mechanical items (for urgent FHTC) for Chak Chandan Water Supply Scheme PH 1 (part-1) under CMD, PHE Dte., Dist.- Purba-Bardhaman ASSISTANT ENGINEER JUNIOR ENGINEER ORD/001669/2023-2024 08/CMSD 02/01/2024 40 CHOUDHURY ENTERPRISE 0.92 0.92 100 100
4631 PURBA BARDHAMAN Raina - II Burdwan Division CHAK CHANDAN PIPED WATER SUPPLY SCHEME , SM/13281 New Continuation Work Order for Supply of one No.Diesel Driven Ambassador Car No. WB:41H-4009 on hire basis for the office of the Assistant Engineer,Burdwan Sub-Division,PHE Dte(Period from 01-03-2025 to 31.05.2025) ORD/001407/2024-2025 457/BSD 28/02/2025 90 SK. ASFIA 1.20 0.00 0 0
4632 PURBA BARDHAMAN Khandaghosh Burdwan Division CHAGRAM PIPED WATER SUPPLY SCHEME , SM/13941 New Material Requisition To Resource Division RTOR000104/2023-2024 1965/BWD 26/04/2023 Resource Division 18.80 0.00 0 0
4633 PURBA BARDHAMAN Khandaghosh Burdwan Division CHAGRAM PIPED WATER SUPPLY SCHEME , SM/13941 New Material Requisition To Resource Division RTOR000190/2023-2024 2155/BWD 10/05/2023 Resource Division 10.42 0.00 0 0
4634 PURBA BARDHAMAN Khandaghosh Central Mechanical CHAGRAM PIPED WATER SUPPLY SCHEME , SM/13941 New New service connection charges for Chagram PWSS TW-1 BILL/00819/2023-2024 BP-2023-24-95 02/08/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.24 0.00 0 0
4635 PURBA BARDHAMAN Khandaghosh Burdwan Division CHAGRAM PIPED WATER SUPPLY SCHEME , SM/13941 New Material Requisition To Resource Division RTOR000712/2023-2024 5043/BWD 23/11/2023 Resource Division 20.46 0.00 0 0
4636 PURBA BARDHAMAN Khandaghosh Central Mechanical CHAGRAM PIPED WATER SUPPLY SCHEME , SM/13941 New New Electric connection Chagram W/S PH-II BILL/01791/2023-2024 BP-2023-24-306 30/12/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.27 0.00 0 0
4637 PURBA BARDHAMAN Khandaghosh Central Mechanical CHAGRAM PIPED WATER SUPPLY SCHEME , SM/13941 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at KHEJURHATI & others water supply scheme under Khandoghosh Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman ASSISTANT ENGINEER Junior Engineer ORD/000071/2024-2025 2391/CMD 02/08/2024 90 C.M. ENTERPRISE 45.81 0.00 0 0
4638 PURBA BARDHAMAN Khandaghosh Central Mechanical CHAGRAM PIPED WATER SUPPLY SCHEME , SM/13941 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at Chagram Water Supply Scheme [ Block- Khandoghosh ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER Junior Engineer ORD/000213/2023-2024 3068/CMD 21/07/2023 30 PADMA ENGINEERING CO. 28.96 5.63 19.44 100
4639 PURBA BARDHAMAN Khandaghosh Burdwan Division CHAGRAM PIPED WATER SUPPLY SCHEME , SM/13941 New Balance work for providing Functional Household Tap Connection (FHTC) within command area GOPALBERA & CHAGRAM W/S. Scheme of Khandaghosh Block under Burdwan Divn., PHE. Dte. Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer1, Durgapur Sub-Division, PHE Dte. ORD/000959/2024-2025 4438/BWD 18/12/2024 120 DUBE ENTERPRISE 143.33 0.00 0 0
4640 PURBA BARDHAMAN Khandaghosh Burdwan Division CHAGRAM PIPED WATER SUPPLY SCHEME , SM/13941 New Different works related (sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of different capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site) to CHAGRAM & KHEJURHATI Piped Water Supply Scheme under Khandaghosh Block, District:- Purba Bardhaman [NEW SCHEME] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer1, Durgapur Sub-Division, PHE Dte.,Junior Engineer2, Durgapur Sub-Division, PHE Dte. ORD/000083/2023-2024 2080/BWD 04/05/2023 698 KHAN ENTERPRISE 688.15 188.71 27.42 58
4641 PURBA BARDHAMAN Burdwan - I Burdwan Division KHAIDYA PIPED WATER SUPPLY SCHEME , SM/13946 New Material Requisition To Resource Division RTOR000100/2023-2024 1962/BWD 25/04/2023 Resource Division 2.56 0.00 0 0
4642 PURBA BARDHAMAN Burdwan - I Burdwan Division KHAIDYA PIPED WATER SUPPLY SCHEME , SM/13946 New Material Requisition To Resource Division RTOR000376/2023-2024 2197/BWD 12/05/2023 Resource Division 9.37 0.00 0 0
4643 PURBA BARDHAMAN Burdwan - I Burdwan Division KHAIDYA PIPED WATER SUPPLY SCHEME , SM/13946 New Material Requisition To Resource Division RTOR000723/2023-2024 5264/BWD 30/11/2023 Resource Division 21.07 0.00 0 0
4644 PURBA BARDHAMAN Burdwan - I Central Mechanical KHAIDYA PIPED WATER SUPPLY SCHEME , SM/13946 New New service connection charges for Khaidya PWSS TW-1 BILL/02201/2023-2024 BP-2023-24-396 17/01/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.66 0.00 0 0
4645 PURBA BARDHAMAN Burdwan - I Central Mechanical KHAIDYA PIPED WATER SUPPLY SCHEME , SM/13946 New New service connection charges for Khaidya PWSS TW-2 BILL/02202/2023-2024 BP-2023-24-397 17/01/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 7.36 0.00 0 0
4646 PURBA BARDHAMAN Burdwan - I Central Mechanical KHAIDYA PIPED WATER SUPPLY SCHEME , SM/13946 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at MALKITA & others water supply scheme under Bardhaman-I Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman ASSISTANT ENGINEER Junior Engineer ORD/000066/2024-2025 2388/CMD 02/08/2024 90 ELECTRICAL & MECHANICAL ENGINEERING CORPORATION 55.95 0.00 0 0
4647 PURBA BARDHAMAN Burdwan - I Burdwan Division KHAIDYA PIPED WATER SUPPLY SCHEME , SM/13946 New Material Requisition To Resource Division RTOR000091/2024-2025 417/BWD 17/01/2025 Resource Division 5.06 0.00 0 0
4648 PURBA BARDHAMAN Burdwan - I Burdwan Division KHAIDYA PIPED WATER SUPPLY SCHEME , SM/13946 New Different works related (sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of different capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site) to BARASAT, JAGADABAD & KHAIDYA Piped Water Supply Scheme under BURDWAN-I Block, District:- Purba Bardhaman [NEW SCHEME] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. J.E. 1 BURDWAN ORD/000465/2023-2024 3460/BWD 08/08/2023 783 CONCORD EMC ENCLAVE LLP 1,526.24 0.00 0 45
4649 PURBA BARDHAMAN Burdwan - I Central Mechanical KHAIDYA PIPED WATER SUPPLY SCHEME , SM/13946 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at Khaidya Water Supply Scheme [ Block- Burdwan-1 ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER Junior Engineer ORD/000657/2023-2024 4000/CMD 29/08/2023 642 AHALYA ENGINEERING WORKS 28.95 0.00 0 90
4650 PURBA BARDHAMAN Burdwan - II Burdwan Division HARIGRAM PIPED WATER SUPPLY SCHEME , SM/13292 New Material Requisition To Resource Division RTOR000071/2022-2023 1252/BWD 17/03/2023 Resource Division 7.50 0.00 0 0
4651 PURBA BARDHAMAN Burdwan - II Burdwan Division HARIGRAM PIPED WATER SUPPLY SCHEME , SM/13292 New Material Requisition To Resource Division RTOR000108/2022-2023 1643/BWD 06/04/2023 Resource Division 1.79 0.00 0 0
4652 PURBA BARDHAMAN Burdwan - II Central Mechanical HARIGRAM PIPED WATER SUPPLY SCHEME , SM/13292 New New service connection charges for Harigram PWSS TW-1 BILL/01471/2023-2024 BP-2023-24-169 27/09/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 4.50 0.00 0 0
4653 PURBA BARDHAMAN Burdwan - II Burdwan Division HARIGRAM PIPED WATER SUPPLY SCHEME , SM/13292 New Material Requisition To Resource Division RTOR000717/2023-2024 5267/BWD 30/11/2023 Resource Division 21.07 0.00 0 0
4654 PURBA BARDHAMAN Burdwan - II Central Mechanical HARIGRAM PIPED WATER SUPPLY SCHEME , SM/13292 New New service connection charges for Harigram PWSS TW-2 BILL/01707/2023-2024 BP-2023-24-236 06/12/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 7.69 0.00 0 0
4655 PURBA BARDHAMAN Burdwan - II Burdwan Division HARIGRAM PIPED WATER SUPPLY SCHEME , SM/13292 New Continuation order for "Supply of one No. Diesel Driven Ambassador Car on hire basis for the office of the Assistant Engineer, Burdwan Sub-Division, PHE Dte for the period of 01.12.2023 to 31.05.2024 Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/001007/2023-2024 2751/BSD 28/11/2023 183 SK.ASFIA 2.40 0.00 0 70
4656 PURBA BARDHAMAN Burdwan - II Central Mechanical HARIGRAM PIPED WATER SUPPLY SCHEME , SM/13292 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at KUSHA & others water supply scheme under Bardhaman-II Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman ASSISTANT ENGINEER Junior Engineer ORD/000065/2024-2025 2389/CMD 02/08/2024 90 DILIP MAHATO 53.14 0.00 0 0
4657 PURBA BARDHAMAN Burdwan - II Burdwan Division HARIGRAM PIPED WATER SUPPLY SCHEME , SM/13292 New HARIGRAM Piped Water Supply Scheme with Sinking of tube-well, LDS, Rising Main, FHTC, Construction of 150 cum capacity RCC OHR with 20.0 mtr. with Staging height including soil investigation & construction of switch-rooms & boundary walls at different TW site under Burdwan-II Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. Junior Engineer, Burdwan Sadar Sub-Division ORD/000684/2022-2023 481/BWD 08/02/2023 365 SAKTI ENTERPRISE 262.46 65.84 25.09 81
4658 PURBA BARDHAMAN Burdwan - II Central Mechanical HARIGRAM PIPED WATER SUPPLY SCHEME , SM/13292 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at Harigram Water Supply Scheme [ Block- Burdwan-2 ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER Junior Engineer ORD/000590/2023-2024 3940/CMD 23/08/2023 30 CHOUDHURY ENTERPRISE 28.90 5.65 19.55 100
4659 PURBA BARDHAMAN Burdwan - II Central Mechanical HARIGRAM PIPED WATER SUPPLY SCHEME , SM/13292 New Supply and installation of Electro-Magnetic flow meter at HARIGRAM, KUCHUT & others water supply scheme under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. ASSISTANT ENGINEER Junior Engineer ORD/000564/2024-2025 3103/CMD 11/12/2024 60 S DUTTA 15.06 0.00 0 0
4660 PURBA BARDHAMAN Burdwan - II Burdwan Division Baikunthapur Piped Water Supply Scheme , SM/13294 New Material Requisition To Resource Division RTOR000020/2023-2024 1962/BWD 25/04/2023 Resource Division 4.39 0.00 0 0
4661 PURBA BARDHAMAN Burdwan - II Burdwan Division Baikunthapur Piped Water Supply Scheme , SM/13294 New Material Requisition To Resource Division RTOR000218/2023-2024 2155/BWD 10/05/2023 Resource Division 1.97 0.00 0 0
4662 PURBA BARDHAMAN Burdwan - II Burdwan Division Baikunthapur Piped Water Supply Scheme , SM/13294 New Material Requisition To Resource Division RTOR000707/2023-2024 5044/BWD 23/11/2023 Resource Division 20.46 0.00 0 0
4663 PURBA BARDHAMAN Burdwan - II Central Mechanical Baikunthapur Piped Water Supply Scheme , SM/13294 New New service connection at BAIAKUNTHAPUR PWSS Ph-2 BILL/02326/2023-2024 BP-2023-24-443 29/01/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.73 0.00 0 0
4664 PURBA BARDHAMAN Burdwan - II Central Mechanical Baikunthapur Piped Water Supply Scheme , SM/13294 New New service connection at BAIAKUNTHAPUR PWSS Ph-1 BILL/02325/2023-2024 BP-2023-24-442 29/01/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 7.45 0.00 0 0
4665 PURBA BARDHAMAN Burdwan - II Burdwan Division Baikunthapur Piped Water Supply Scheme , SM/13294 New Different works related (sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of different capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site) to AMRA & BAIKUNTHAPUR Piped Water Supply Scheme under Burdwan II Block, District:- Purba Bardhaman [NEW SCHEME] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. Junior Engineer, Burdwan Sadar Sub-Division ORD/000089/2023-2024 2214/BWD 15/05/2023 365 CONCORD ENGINEERING 750.87 106.78 14.22 20
4666 PURBA BARDHAMAN Burdwan - II Central Mechanical Baikunthapur Piped Water Supply Scheme , SM/13294 New New service connection charges for Baikunthapur PWSS TW-2 BILL/02940/2023-2024 BP-2023-24-517 08/02/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 0.48 0.00 0 0
4667 PURBA BARDHAMAN Burdwan - II Central Mechanical Baikunthapur Piped Water Supply Scheme , SM/13294 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at KUSHA & others water supply scheme under Bardhaman-II Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman ASSISTANT ENGINEER Junior Engineer ORD/000065/2024-2025 2389/CMD 02/08/2024 90 DILIP MAHATO 53.14 0.00 0 0
4668 PURBA BARDHAMAN Burdwan - II Central Mechanical Baikunthapur Piped Water Supply Scheme , SM/13294 New Hiring of inspection vehicle (Diesel/CNG/LPG Driven) for supervision of site for the office of the Assistant Engineer,under CMD PHE Dte. w.e.f -01/08/2024 to 30/09/2024 .[Under JJM Works] ASSISTANT ENGINEER Junior Engineer ORD/000418/2024-2025 834/CMSD 07/06/2024 61 PRODYUT GHOSH 0.80 0.00 0 0
4669 PURBA BARDHAMAN Burdwan - II Central Mechanical Baikunthapur Piped Water Supply Scheme , SM/13294 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at Baikunthapur Water Supply Scheme [ Block- Burdwan-2 ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER Junior Engineer ORD/000663/2023-2024 4006/CMD 29/08/2023 30 A.S. ENTERPRISE 28.95 0.00 0 95
4670 PURBA BARDHAMAN Burdwan - II Burdwan Division Baikunthapur Piped Water Supply Scheme , SM/13294 New Shifting of pole for laying of water supply pipeline of Baikunthapur pwss under Burdwan Division, PHE Dte. [Ref ID-860315315, Application ID-100000120685, dt.-01/10/2024] BILL/01091/2024-2025 1173/JJM 17/12/2024 WBSEDCL 0.89 0.00 0 0
4671 PURBA BARDHAMAN Burdwan - II Central Mechanical Baikunthapur Piped Water Supply Scheme , SM/13294 New New service connection for Baikunthapur PWSS TW 2 BILL/02413/2023-2024 null 05/02/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 4.21 0.00 0 0
4672 PURBA BARDHAMAN Burdwan - II Burdwan Division Baikunthapur Piped Water Supply Scheme , SM/13294 New Material Requisition To Resource Division RTOR000059/2024-2025 385/BWD 17/01/2025 Resource Division 9.89 0.00 0 0
4673 PURBA BARDHAMAN Burdwan - II Burdwan Division Baikunthapur Piped Water Supply Scheme , SM/13294 New Different Types of work involved in connection with different Augmentation & New Schemes (11 Nos.) Piped Water Supply Scheme under Burdwan II Block within Burdwan Sub-Div., under Burdwan Division PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/001349/2024-2025 1060/BWD 25/03/2025 120 R.G. INFRASTRUCTURE 262.23 0.00 0 0
4674 PURBA BARDHAMAN Purbasthali - I Burdwan Division HARIPUR PIPED WATER SUPPLY SCHEME , SM/13315 New Material Requisition To Resource Division RTOR000152/2023-2024 2155/BWD 10/05/2023 Resource Division 10.75 0.00 0 0
4675 PURBA BARDHAMAN Purbasthali - I Central Mechanical HARIPUR PIPED WATER SUPPLY SCHEME , SM/13315 New New service connection charges for Haripur PWSS TW-1 BILL/00820/2023-2024 BP-2023-24-97 02/08/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.02 0.00 0 0
4676 PURBA BARDHAMAN Purbasthali - I Burdwan Division HARIPUR PIPED WATER SUPPLY SCHEME , SM/13315 New Material Requisition To Resource Division RTOR000521/2023-2024 4284/BWD 29/09/2023 Resource Division 0.55 0.00 0 0
4677 PURBA BARDHAMAN Purbasthali - I Central Mechanical HARIPUR PIPED WATER SUPPLY SCHEME , SM/13315 New Supply & Installation of Submersible Pumping Machinery , Voltage Stabilizer, Chlorination System and Internal House wiring for Tube well no.- 1 & 2 at HARIPUR Water Supply Scheme [Block - PURBASTHALI-1] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000164/2023-2024 2931/CMD 12/07/2023 30 ASHIM UDYOG 20.77 9.37 45.11 30
4678 PURBA BARDHAMAN Purbasthali - I Burdwan Division HARIPUR PIPED WATER SUPPLY SCHEME , SM/13315 New Material Requisition To Resource Division RTOR000599/2023-2024 4905/BWD 10/11/2023 Resource Division 4.86 0.00 0 0
4679 PURBA BARDHAMAN Purbasthali - I Central Mechanical HARIPUR PIPED WATER SUPPLY SCHEME , SM/13315 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Haripur & others water supply scheme under purbasthali 1 Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000072/2024-2025 2397/CMD 02/08/2024 90 CHATTERJEE ENTERPRISE 48.60 0.00 0 0
4680 PURBA BARDHAMAN Purbasthali - I Central Mechanical HARIPUR PIPED WATER SUPPLY SCHEME , SM/13315 New Withdrawing of pump motor set due to low discharge and installation of new pump motor set at Haripur PH 1 (Purbasthali-1 Block) water supply scheme under CMD P.H.E. Dte. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/001893/2023-2024 364/CMSD 28/02/2024 15 ASHIM UDYOG 0.67 0.00 0 0
4681 PURBA BARDHAMAN Purbasthali - I Central Mechanical HARIPUR PIPED WATER SUPPLY SCHEME , SM/13315 New Supply and Delivery of standby pump motor set for Sipta, Uchitpur, Haripur & others Water Supply Scheme under CMD, PHE Dte. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000142/2024-2025 2596/CMD 27/08/2024 30 JOYGURU ENTERPRISE 4.72 0.00 0 100
4682 PURBA BARDHAMAN Purbasthali - I Burdwan Division HARIPUR PIPED WATER SUPPLY SCHEME , SM/13315 New Different Types of work involved in connection with Augmentation of NAOPARA (SM/09407) & HARIPUR (SM/13315) water supply scheme Piped water supply scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000164/2024-2025 2203/BWD 13/06/2024 344 MONDAL & CO. 223.65 0.00 0 50
4683 PURBA BARDHAMAN Purbasthali - I Burdwan Division HARIPUR PIPED WATER SUPPLY SCHEME , SM/13315 New HARIPUR Piped Water Supply Scheme with sinking of Tube-well, LDS, Rising Main, FHTC & construction of switch rooms & boundary walls with gates and land development, drain and internal pathway at different TW site under Purbasthali I Block, District:- Purba-Bardhaman [NEW SCHEME]. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000774/2022-2023 1340/BWD 22/03/2023 373 INVENT ENGINEERS CO. OPERATIVE SOCIETY LTD. 94.46 47.88 50.69 100
4684 PURBA BARDHAMAN Purbasthali - I Burdwan Division HARIPUR PIPED WATER SUPPLY SCHEME , SM/13315 New Work order for " Provided leftout FHTC at different location of " Haripur& Dastipara Mouzas" under the command area of HARIPUR PWSS(SM/13315) in order to Declare Haripur as "SAJALGRAM" under Kalna Sub-Division under Burdwan Division, PHE Dte." Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/001377/2024-2025 304/KSD 25/02/2025 15 SAYAK DEY 1.79 0.00 0 0
4685 PURBA BARDHAMAN Purbasthali - I Burdwan Division HARIPUR PIPED WATER SUPPLY SCHEME , SM/13315 New Refitting & Re-fixing of Existing FHTC along with laying of damaged portion Pipeline Due to construction of Concrete Drain by PRI body at Haripur (SM/13315) Piped Water Supply Scheme water supply scheme under Kalna Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000999/2024-2025 4619/BWD 31/12/2024 30 MONDAL & CO. 9.67 0.00 0 0
4686 PURBA BARDHAMAN Katwa - II Burdwan Division KALIKAPUR PIPED WATER SUPPLY SCHEME , SM/14053 New Material Requisition To Resource Division RTOR000063/2022-2023 1259/BWD 17/03/2023 Resource Division 17.21 0.00 0 0
4687 PURBA BARDHAMAN Katwa - II Burdwan Division KALIKAPUR PIPED WATER SUPPLY SCHEME , SM/14053 New Material Requisition To Resource Division RTOR000111/2022-2023 1645/BWD 06/04/2023 Resource Division 14.26 0.00 0 0
4688 PURBA BARDHAMAN Katwa - II Central Mechanical KALIKAPUR PIPED WATER SUPPLY SCHEME , SM/14053 New New service connection charges for Kalikapur PWSS TW-1 BILL/01444/2023-2024 BP-2023-24-155 07/09/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 9.07 0.00 0 0
4689 PURBA BARDHAMAN Katwa - II Central Mechanical KALIKAPUR PIPED WATER SUPPLY SCHEME , SM/14053 New New service connection charges for Kalikapur PWSS TW-2 BILL/01469/2023-2024 BP-2023-24-170 27/09/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.43 0.00 0 0
4690 PURBA BARDHAMAN Katwa - II Central Mechanical KALIKAPUR PIPED WATER SUPPLY SCHEME , SM/14053 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at Kalikapur Water Supply Scheme [ Block- Katwa-2 ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. Driller In-Charge Junior Engineer ORD/000596/2023-2024 3953/CMD 24/08/2023 30 M/S, S.S. ENTERPRISE. 29.61 0.00 0 90
4691 PURBA BARDHAMAN Katwa - II Central Mechanical KALIKAPUR PIPED WATER SUPPLY SCHEME , SM/14053 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Mulgram & others water supply scheme under Katwa-II Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. ASSISTANT ENGINEER Junior Engineer ORD/000070/2024-2025 2409/CMD 02/08/2024 90 DUTTA ENTERPRISE 50.18 0.00 0 0
4692 PURBA BARDHAMAN Katwa - II Burdwan Division KALIKAPUR PIPED WATER SUPPLY SCHEME , SM/14053 New Continuation Work Order for Supply of 1 (one) No. Inspection Vehicle for different JJM Related Works as and when required including supply of driver and fuels (Minimum 8 Hours of duty) under Katwa Sub-Division within Burdwan Division, P.H.E. Dte. Consider 96.00 Km run per Day Assistant Engineer JUNIOR ENGINEER KATWA SUB-DIVISION PHE DTE ORD/000683/2024-2025 1009/KTS 19/07/2024 60 AJIT SAMANTA 0.77 0.23 29.87 100
4693 PURBA BARDHAMAN Katwa - II Burdwan Division KALIKAPUR PIPED WATER SUPPLY SCHEME , SM/14053 New KALIKAPUR Piped Water Supply Scheme with sinking of Tube-well, LDS, Rising Main, FHTC, Construction of 400 cum capacity RCC OHR with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drain and internal pathway at different TW site under KATWA -II Block, District:- Purba-Bardhaman [NEW SCHEME]. Assistant Engineer JUNIOR ENGINEER KATWA SUB-DIVISION PHE DTE ORD/000732/2022-2023 1047/BWD 09/03/2023 968 PASCON 629.59 170.01 27 67
4694 PURBA BARDHAMAN Katwa - II Burdwan Division KALIKAPUR PIPED WATER SUPPLY SCHEME , SM/14053 New Balance work of OHR, Functional Household Tap Connection, Road restoration etc. for Kalikapur PWSS under KATWA -II Block under Katwa Sub-Division under Burdwan Division, PHED, District:- Purba-Bardhaman. Assistant Engineer JUNIOR ENGINEER KATWA SUB-DIVISION PHE DTE ORD/001040/2024-2025 192/BWD 08/01/2025 120 PASCON 57.78 0.00 0 90
4695 PURBA BARDHAMAN Memari - II Burdwan Division BARAPALASHAN PIPED WATER SUPPLY SCHEME , SM/13423 New Material Requisition To Resource Division RTOR000234/2023-2024 2197/BWD 12/05/2023 Resource Division 23.40 0.00 0 0
4696 PURBA BARDHAMAN Memari - II Burdwan Division BARAPALASHAN PIPED WATER SUPPLY SCHEME , SM/13423 New Material Requisition To Resource Division RTOR000501/2023-2024 4025/BWD 08/09/2023 Resource Division 6.08 0.00 0 0
4697 PURBA BARDHAMAN Memari - II Burdwan Division BARAPALASHAN PIPED WATER SUPPLY SCHEME , SM/13423 New Material Requisition To Resource Division RTOR000653/2023-2024 5099/BWD 23/11/2023 Resource Division 20.46 0.00 0 0
4698 PURBA BARDHAMAN Memari - II Central Mechanical BARAPALASHAN PIPED WATER SUPPLY SCHEME , SM/13423 New New service connection at Barapalasan PWSS TW -1. BILL/02332/2023-2024 BP-2023-24-447 29/01/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.90 0.00 0 0
4699 PURBA BARDHAMAN Memari - II Central Mechanical BARAPALASHAN PIPED WATER SUPPLY SCHEME , SM/13423 New New service connection at Barapalasan PWSS TW -2 BILL/02331/2023-2024 BP-2023-24-448 29/01/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 5.18 0.00 0 0
4700 PURBA BARDHAMAN Memari - II Central Mechanical BARAPALASHAN PIPED WATER SUPPLY SCHEME , SM/13423 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at NOAHATI & others water supply scheme under Memari-II Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. ASSISTANT ENGINEER Junior Engineer ORD/000102/2024-2025 2395/CMD 02/08/2024 90 S.G. TECHNICAL SERVICES 36.99 0.00 0 0
4701 PURBA BARDHAMAN Memari - II Burdwan Division BARAPALASHAN PIPED WATER SUPPLY SCHEME , SM/13423 New Continuation work order for "Supply of one No. Diesel Driven Ambassador Car on hire basis for the office of the Assistant Engineer, Burdwan Sub-Division, PHE Dte. (Period from 01-06-2024 to 31-08-2024" JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000228/2024-2025 918/BSD 28/05/2024 92 SK. ASFIA 1.20 0.00 0 60
4702 PURBA BARDHAMAN Memari - II Central Mechanical BARAPALASHAN PIPED WATER SUPPLY SCHEME , SM/13423 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at Barapalashan Water Supply Scheme [ Block- Memari-2 ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER Junior Engineer ORD/000711/2023-2024 4022/CMD 29/08/2023 30 MITRA ENTERPRISE 29.26 0.00 0 50
4703 PURBA BARDHAMAN Memari - II Burdwan Division BARAPALASHAN PIPED WATER SUPPLY SCHEME , SM/13423 New BARA PALASHAN Piped Water Supply Scheme with sinking of Tube-well, LDS, Rising Main, FHTC, Construction of 250 cum capacity RCC OHR with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drain and internal pathway at different TW site under Memari-II Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER RWS BURDWAN SUB-DIVISION PHE DTE ORD/000111/2023-2024 2300/BWD 19/05/2023 867 MLG CONSTRUCTION 358.59 26.03 7.26 65
4704 PURBA BARDHAMAN Memari - II Burdwan Division BARAPALASHAN PIPED WATER SUPPLY SCHEME , SM/13423 New Continuation Work Order for Supply of one No.Diesel Driven Ambassador Car No. WB:41H-4009 on hire basis for the office of the Assistant Engineer,Burdwan Sub-Division,PHE Dte(Period from 01-03-2025 to 31.05.2025) ORD/001407/2024-2025 457/BSD 28/02/2025 90 SK. ASFIA 1.20 0.00 0 0
4705 PURBA BARDHAMAN Ausgram - I Burdwan Division JAYKRISHNAPUR PIPED WATER SUPPLY SCHEME , SM/14073 New Material Requisition To Resource Division RTOR000024/2023-2024 1962/BWD 25/04/2023 Resource Division 39.22 0.00 0 0
4706 PURBA BARDHAMAN Ausgram - I Burdwan Division JAYKRISHNAPUR PIPED WATER SUPPLY SCHEME , SM/14073 New Material Requisition To Resource Division RTOR000292/2023-2024 2197/BWD 12/05/2023 Resource Division 6.23 0.00 0 0
4707 PURBA BARDHAMAN Ausgram - I Burdwan Division JAYKRISHNAPUR PIPED WATER SUPPLY SCHEME , SM/14073 New Material Requisition To Resource Division RTOR000776/2023-2024 200/BWD 10/01/2024 Resource Division 7.26 0.00 0 0
4708 PURBA BARDHAMAN Ausgram - I Central Mechanical JAYKRISHNAPUR PIPED WATER SUPPLY SCHEME , SM/14073 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Joykrishnapur & others water supply scheme under Purbasthali-2,jamalpur,kalna 1 Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000101/2024-2025 2398/CMD 02/08/2024 90 MS S G ENTERPRISE 53.43 0.00 0 0
4709 PURBA BARDHAMAN Ausgram - I Central Mechanical JAYKRISHNAPUR PIPED WATER SUPPLY SCHEME , SM/14073 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Pichkuri, karatia & others water supply scheme under Ausgram-1 Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman Driller In-Charge JUNIOR ENGINEER ORD/000398/2024-2025 2764/CMD 26/09/2024 90 JAL PRAVAHIKA PVT LTD 52.55 0.00 0 0
4710 PURBA BARDHAMAN Ausgram - I Durgapur W/S Division JAYKRISHNAPUR PIPED WATER SUPPLY SCHEME , SM/14073 New Material Requisition To Resource Division RTOR000023/2024-2025 2/C/DWSD 02/01/2025 Resource Division 6.89 0.00 0 0
4711 PURBA BARDHAMAN Ausgram - I Durgapur W/S Division JAYKRISHNAPUR PIPED WATER SUPPLY SCHEME , SM/14073 New ACCEPTANCE CUM FORMAL WORK ORDER FOR Supplying, delivery, Installation of 13 (Thirteen) Nos new PC and upgradation 6 (Six) Nos existing PC including providing other asseries as per office requirement for JJM works under Durgapur W/s Division, PHE Dte under Jaykrishnapur PWSS,Aligram PWSS,Jadabganj PWSS and Kalyanpur PWSS. Assistant Engineer-II JUNIOR ENGINEER-2,Junior Engineer_3 ORD/000237/2024-2025 59/DWSD 10/01/2025 45 DIGITEK SOLUTIONS 17.56 0.00 0 85
4712 PURBA BARDHAMAN Ausgram - I Central Mechanical JAYKRISHNAPUR PIPED WATER SUPPLY SCHEME , SM/14073 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at JAYKRISHNAPUR Water Supply Scheme [ Block- AUSGRAM-1 ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. Driller In-Charge JUNIOR ENGINEER ORD/000810/2023-2024 4094/CMD 29/08/2023 588 MS S G ENTERPRISE 27.68 0.00 0 96
4713 PURBA BARDHAMAN Ausgram - I Burdwan Division JAYKRISHNAPUR PIPED WATER SUPPLY SCHEME , SM/14073 New Different works related (sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of different capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site) to ALIGRAM, JAYKRISHNAPUR, JADABGANJ & KALYANPUR Piped Water Supply Scheme under AUSGRAM-I Block, District:- Purba-Bardhaman [NEW SCHEME] AE(HQs) JUNIOR ENGINEER R.W.S. BURDWAN SUB-DIVISION PHE DTE ORD/000727/2023-2024 4581/BWD 16/10/2023 965 SAFECO ENTERPRISES 1,551.98 0.00 0 60
4714 PURBA BARDHAMAN Khandaghosh Burdwan Division KAMALPUR PIPED WATER SUPPLY SCHEME , SM/13942 New Material Requisition To Resource Division RTOR000106/2023-2024 1965/BWD 26/04/2023 Resource Division 5.64 0.00 0 0
4715 PURBA BARDHAMAN Khandaghosh Burdwan Division KAMALPUR PIPED WATER SUPPLY SCHEME , SM/13942 New Material Requisition To Resource Division RTOR000193/2023-2024 2155/BWD 10/05/2023 Resource Division 14.43 0.00 0 0
4716 PURBA BARDHAMAN Khandaghosh Burdwan Division KAMALPUR PIPED WATER SUPPLY SCHEME , SM/13942 New Material Requisition To Resource Division RTOR000306/2023-2024 2197/BWD 12/05/2023 Resource Division 19.29 0.00 0 0
4717 PURBA BARDHAMAN Khandaghosh Burdwan Division KAMALPUR PIPED WATER SUPPLY SCHEME , SM/13942 New Material Requisition To Resource Division RTOR000720/2023-2024 5266/BWD 30/11/2023 Resource Division 21.07 0.00 0 0
4718 PURBA BARDHAMAN Khandaghosh Central Mechanical KAMALPUR PIPED WATER SUPPLY SCHEME , SM/13942 New NEW SERVICE CONNECTION FOR KAMALPUR PWSS PH-2. BILL/02874/2023-2024 BP-2023-24-602 06/03/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 2.80 0.00 0 0
4719 PURBA BARDHAMAN Khandaghosh Central Mechanical KAMALPUR PIPED WATER SUPPLY SCHEME , SM/13942 New NEW SERVICE CONNECTION FOR KAMALPUR PWSS PH-1. BILL/02870/2023-2024 BP-2023-24-601 06/03/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 2.95 0.00 0 0
4720 PURBA BARDHAMAN Khandaghosh Burdwan Division KAMALPUR PIPED WATER SUPPLY SCHEME , SM/13942 New Continuation order for Supply of 01(one) No. Diesel Driven Motor Cab (Bharat Stage-II) on hire basis for the office of the Assistant Engineer, Durgapur Sub-Division (Burdwan North) P.H.E. Dte. Govt. of West Bengal (for the period of 01/01/2024 to 31/05/2024) Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer1, Durgapur Sub-Division, PHE Dte. ORD/001180/2023-2024 995/DSD 29/12/2023 183 SUJAUDDIN SEKH 2.00 0.00 0 60
4721 PURBA BARDHAMAN Khandaghosh Central Mechanical KAMALPUR PIPED WATER SUPPLY SCHEME , SM/13942 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at Kamalpur Water Supply Scheme [ Block- Khandoghosh ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER Junior Engineer ORD/000733/2023-2024 4043/CMD 29/08/2023 30 M/S. SWAPAN BANERJEE 28.97 0.00 0 92
4722 PURBA BARDHAMAN Khandaghosh Central Mechanical KAMALPUR PIPED WATER SUPPLY SCHEME , SM/13942 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at KHEJURHATI & others water supply scheme under Khandoghosh Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman ASSISTANT ENGINEER Junior Engineer ORD/000071/2024-2025 2391/CMD 02/08/2024 90 C.M. ENTERPRISE 45.81 0.00 0 0
4723 PURBA BARDHAMAN Khandaghosh Burdwan Division KAMALPUR PIPED WATER SUPPLY SCHEME , SM/13942 New Different works related (sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of different capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site) to SARANGA & KAMALPUR Piped Water Supply Scheme under Khandaghosh Block, District:- Purba Bardhaman [NEW SCHEME] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer1, Durgapur Sub-Division, PHE Dte.,Junior Engineer2, Durgapur Sub-Division, PHE Dte. ORD/000082/2023-2024 2078/BWD 04/05/2023 698 KHAN ENTERPRISE 820.73 97.94 11.93 42
4724 PURBA BARDHAMAN Khandaghosh Central Mechanical KAMALPUR PIPED WATER SUPPLY SCHEME , SM/13942 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Manganpur & others water supply scheme under Purbasthali 1 Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000714/2024-2025 2979/CMD 25/11/2024 90 H.K. DAS & CO. 53.27 0.00 0 0
4725 PURBA BARDHAMAN Burdwan - I Burdwan Division PALITPUR PIPED WATER SUPPLY SCHEME , SM/14076 New Material Requisition To Resource Division RTOR000009/2023-2024 1962/BWD 25/04/2023 Resource Division 5.23 0.00 0 0
4726 PURBA BARDHAMAN Burdwan - I Burdwan Division PALITPUR PIPED WATER SUPPLY SCHEME , SM/14076 New Material Requisition To Resource Division RTOR000361/2023-2024 2197/BWD 12/05/2023 Resource Division 10.42 0.00 0 0
4727 PURBA BARDHAMAN Burdwan - I Central Mechanical PALITPUR PIPED WATER SUPPLY SCHEME , SM/14076 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at Palitpur Water Supply Scheme [ Block- Burdwan-1 ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER Junior Engineer ORD/000661/2023-2024 4004/CMD 29/08/2023 30 SUBRATA BHADRA 28.96 0.00 0 0
4728 PURBA BARDHAMAN Burdwan - I Burdwan Division PALITPUR PIPED WATER SUPPLY SCHEME , SM/14076 New Material Requisition To Resource Division RTOR000728/2023-2024 5275/BWD 30/11/2023 Resource Division 21.07 0.00 0 0
4729 PURBA BARDHAMAN Burdwan - I Central Mechanical PALITPUR PIPED WATER SUPPLY SCHEME , SM/14076 New New service connection charges for Palitpur PWSS TW-1 BILL/01671/2023-2024 BP-2023-24-228 10/11/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 2.84 0.00 0 0
4730 PURBA BARDHAMAN Burdwan - I Central Mechanical PALITPUR PIPED WATER SUPPLY SCHEME , SM/14076 New New service connection charges for Palitpur PWSS TW-2 BILL/01672/2023-2024 BP-2023-24-229 10/11/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 2.84 0.00 0 0
4731 PURBA BARDHAMAN Burdwan - I Burdwan Division PALITPUR PIPED WATER SUPPLY SCHEME , SM/14076 New Different works related (sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of different capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site) to KALIGRAM & PALITPUR Piped Water Supply Scheme under Burdwan I Block, District:- Purba Bardhaman [NEW SCHEME] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000499/2023-2024 3532/BWD 10/08/2023 365 SUPRITI ENTERPRISE 704.50 0.00 0 10
4732 PURBA BARDHAMAN Burdwan - I Central Mechanical PALITPUR PIPED WATER SUPPLY SCHEME , SM/14076 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at MALKITA & others water supply scheme under Bardhaman-I Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman ASSISTANT ENGINEER Junior Engineer ORD/000066/2024-2025 2388/CMD 02/08/2024 90 ELECTRICAL & MECHANICAL ENGINEERING CORPORATION 55.95 0.00 0 0
4733 PURBA BARDHAMAN Kalna - I Burdwan Division UTRA PIPED WATER SUPPLY SCHEME , SM/14077 New Material Requisition To Resource Division RTOR000040/2023-2024 1962/BWD 25/04/2023 Resource Division 49.01 0.00 0 0
4734 PURBA BARDHAMAN Kalna - I Burdwan Division UTRA PIPED WATER SUPPLY SCHEME , SM/14077 New Material Requisition To Resource Division RTOR000188/2023-2024 2155/BWD 10/05/2023 Resource Division 12.47 0.00 0 0
4735 PURBA BARDHAMAN Kalna - I Central Mechanical UTRA PIPED WATER SUPPLY SCHEME , SM/14077 New New service connection charges for Utra PWSS TW 1 BILL/00815/2023-2024 BP-2023-24-91 31/07/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 4.03 0.00 0 0
4736 PURBA BARDHAMAN Kalna - I Central Mechanical UTRA PIPED WATER SUPPLY SCHEME , SM/14077 New New service connection charges for Utra PWSS TW 2 BILL/00812/2023-2024 BP-2023-24-90 28/07/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.59 0.00 0 0
4737 PURBA BARDHAMAN Kalna - I Burdwan Division UTRA PIPED WATER SUPPLY SCHEME , SM/14077 New Material Requisition To Resource Division RTOR000568/2023-2024 4940/BWD 10/11/2023 Resource Division 39.83 0.00 0 0
4738 PURBA BARDHAMAN Kalna - I Central Mechanical UTRA PIPED WATER SUPPLY SCHEME , SM/14077 New Continuation order for Hiring of Inspection Vehicle (Diesel/CNG/LPG Driven) for supervision of site for the office of the Assistant Engineer, under C.M.D. P.H.E. Dte. w.e.f.-01/09/2023 to 31/10/2023 [JJM Works]. ASSISTANT ENGINEER ORD/000851/2023-2024 734/CMSD-I 29/08/2023 61 SUBRATA BHADRA 0.79 0.79 100 50
4739 PURBA BARDHAMAN Kalna - I Central Mechanical UTRA PIPED WATER SUPPLY SCHEME , SM/14077 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at UTRA Water Supply Scheme [ Block- KALNA-1] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000140/2023-2024 2857/CMD 05/07/2023 30 SOUNAK ENTERPRISE 28.48 22.04 77.39 90
4740 PURBA BARDHAMAN Kalna - I Central Mechanical UTRA PIPED WATER SUPPLY SCHEME , SM/14077 New Standby Pump Motor set for Utra PH 2 Water Supply Scheme under CMD, PHE Dte. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/001662/2023-2024 1074/CMSD 15/12/2023 12 M/S. S.D. CONSTRUCTION 0.84 0.00 0 100
4741 PURBA BARDHAMAN Kalna - I Central Mechanical UTRA PIPED WATER SUPPLY SCHEME , SM/14077 New Standby Pump Motor set for UTRA PH 1 water supply scheme under CMD,PHE,Dte. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/001729/2023-2024 1076/CMSD 15/12/2023 15 SUDIKSHA CONSTRUCTION 0.84 0.00 0 100
4742 PURBA BARDHAMAN Kalna - I Central Mechanical UTRA PIPED WATER SUPPLY SCHEME , SM/14077 New Supply and Delivery of standby Chlorination System for Utra PH 1 & others Water Supply Scheme under CMD, PHE Dte. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/001598/2023-2024 812/CMSD 04/10/2023 30 SUBRATA BHADRA 0.90 0.00 0 100
4743 PURBA BARDHAMAN Kalna - I Central Mechanical UTRA PIPED WATER SUPPLY SCHEME , SM/14077 New Supply and Delivery of standby Chlorination System for Utra PH 2 & others Water Supply Scheme under CMD, PHE Dte. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/001599/2023-2024 813/CMSD 04/10/2023 30 SUBRATA BHADRA 0.90 0.00 0 100
4744 PURBA BARDHAMAN Kalna - I Central Mechanical UTRA PIPED WATER SUPPLY SCHEME , SM/14077 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Joykrishnapur & others water supply scheme under Purbasthali-2,jamalpur,kalna 1 Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000101/2024-2025 2398/CMD 02/08/2024 90 MS S G ENTERPRISE 53.43 0.00 0 0
4745 PURBA BARDHAMAN Kalna - I Burdwan Division UTRA PIPED WATER SUPPLY SCHEME , SM/14077 New UTRA Piped Water Supply Scheme with sinking of Tube-well, LDS, Rising Main, FHTC, Construction of 300 cum capacity RCC OHR with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drain and internal pathway at different TW site under Monteswar Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer Junior Engineer, R.W.S. Burdwan Sub Division, P.H.E. Dt ORD/000009/2023-2024 1698/BWD 12/04/2023 365 M/S S.S. ENTERPRISE 487.32 256.97 52.73 87
4746 PURBA BARDHAMAN Manteswar Burdwan Division Detailed Project Report of Ground Water Supply Based Piped Water Supply Scheme For Paschim Kharampur PWSS in Manteshwar Block of Burdwan District under Burdwan Division, PHE Dte. , SM/13332 New Material Requisition To Resource Division RTOR000365/2023-2024 2197/BWD 12/05/2023 Resource Division 14.14 0.00 0 0
4747 PURBA BARDHAMAN Manteswar Burdwan Division Detailed Project Report of Ground Water Supply Based Piped Water Supply Scheme For Paschim Kharampur PWSS in Manteshwar Block of Burdwan District under Burdwan Division, PHE Dte. , SM/13332 New Material Requisition To Resource Division RTOR000452/2023-2024 3976/BWD 08/09/2023 Resource Division 103.50 0.00 0 0
4748 PURBA BARDHAMAN Manteswar Burdwan Division Detailed Project Report of Ground Water Supply Based Piped Water Supply Scheme For Paschim Kharampur PWSS in Manteshwar Block of Burdwan District under Burdwan Division, PHE Dte. , SM/13332 New Material Requisition To Resource Division RTOR000781/2023-2024 324/BWD 24/01/2024 Resource Division 92.56 0.00 0 0
4749 PURBA BARDHAMAN Manteswar Central Mechanical Detailed Project Report of Ground Water Supply Based Piped Water Supply Scheme For Paschim Kharampur PWSS in Manteshwar Block of Burdwan District under Burdwan Division, PHE Dte. , SM/13332 New New Service connection at PASCHIM KHARAMPUR PWSS TW-1. BILL/02360/2023-2024 BP-2023-24-479 31/01/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 7.89 0.00 0 0
4750 PURBA BARDHAMAN Manteswar Central Mechanical Detailed Project Report of Ground Water Supply Based Piped Water Supply Scheme For Paschim Kharampur PWSS in Manteshwar Block of Burdwan District under Burdwan Division, PHE Dte. , SM/13332 New New service Paschim Kharapur PWSS TW-2. BILL/02290/2023-2024 BP-2023-24-441 29/01/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.93 0.00 0 0
4751 PURBA BARDHAMAN Manteswar Burdwan Division Detailed Project Report of Ground Water Supply Based Piped Water Supply Scheme For Paschim Kharampur PWSS in Manteshwar Block of Burdwan District under Burdwan Division, PHE Dte. , SM/13332 New Different works related (sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of different capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site) to PASCHIM KHARAMPUR, SHUSHNA & SIGHNALI Piped Water Supply Scheme under Manteswar Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer1, Durgapur Sub-Division, PHE Dte. ORD/000482/2023-2024 3494/BWD 09/08/2023 511 S.P. CONSTRUCTION 1,925.07 114.68 5.96 60
4752 PURBA BARDHAMAN Manteswar Central Mechanical Detailed Project Report of Ground Water Supply Based Piped Water Supply Scheme For Paschim Kharampur PWSS in Manteshwar Block of Burdwan District under Burdwan Division, PHE Dte. , SM/13332 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Sutra & others water supply scheme under Monteswar Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000068/2024-2025 2396/CMD 02/08/2024 455 SINHA ELECTRICALS 78.06 0.00 0 20
4753 PURBA BARDHAMAN Manteswar Central Mechanical Detailed Project Report of Ground Water Supply Based Piped Water Supply Scheme For Paschim Kharampur PWSS in Manteshwar Block of Burdwan District under Burdwan Division, PHE Dte. , SM/13332 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at Paschim Kharampur Water Supply Scheme [ Block- Monteshwar ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000739/2023-2024 4049/CMD 29/08/2023 609 MITRA ENTERPRISE 29.57 0.00 0 85
4754 PURBA BARDHAMAN Purbasthali - I Burdwan Division MASGARIA PIPED WATER SUPPLY SCHEME , SM/13318 New Material Requisition To Resource Division RTOR000157/2023-2024 2155/BWD 10/05/2023 Resource Division 13.55 0.00 0 0
4755 PURBA BARDHAMAN Purbasthali - I Burdwan Division MASGARIA PIPED WATER SUPPLY SCHEME , SM/13318 New Material Requisition To Resource Division RTOR000472/2023-2024 3996/BWD 08/09/2023 Resource Division 1.64 0.00 0 0
4756 PURBA BARDHAMAN Purbasthali - I Central Mechanical MASGARIA PIPED WATER SUPPLY SCHEME , SM/13318 New New service connection charges for Masgaria PWSS TW-1 BILL/01428/2023-2024 BP-2023-24-132 05/09/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.75 0.00 0 0
4757 PURBA BARDHAMAN Purbasthali - I Central Mechanical MASGARIA PIPED WATER SUPPLY SCHEME , SM/13318 New New service connection charges for Masgaria PWSS TW-2 BILL/01467/2023-2024 BP-2023-24-165 26/09/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.20 0.00 0 0
4758 PURBA BARDHAMAN Purbasthali - I Central Mechanical MASGARIA PIPED WATER SUPPLY SCHEME , SM/13318 New Addl quotation for New service connection charges for Masgaria PWSS TW-1 BILL/01729/2023-2024 BP-2023-24-240 07/12/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.44 0.00 0 0
4759 PURBA BARDHAMAN Purbasthali - I Burdwan Division MASGARIA PIPED WATER SUPPLY SCHEME , SM/13318 New Material Requisition To Resource Division RTOR000803/2023-2024 294/BWD 24/01/2024 Resource Division 14.63 0.00 0 0
4760 PURBA BARDHAMAN Purbasthali - I Central Mechanical MASGARIA PIPED WATER SUPPLY SCHEME , SM/13318 New Supply & Installation of Submersible Pumping Machinery , Voltage Stabilizer, Chlorination System and Internal House wiring for Tube well no.- 1 & 2 at MASGARIA Water Supply Scheme [Block-PURBASTHALI-1] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000357/2023-2024 3505/CMD 31/07/2023 30 M/S. SWAPAN BANERJEE 21.55 0.00 0 95
4761 PURBA BARDHAMAN Purbasthali - I Central Mechanical MASGARIA PIPED WATER SUPPLY SCHEME , SM/13318 New Supply and delivery of different Electro-mechanical items (for urgent FHTC) for masgaria Water Supply Scheme PH 2 (part-1) under CMD, PHE Dte., Dist.- Purba-Bardhaman ASSISTANT ENGINEER JUNIOR ENGINEER ORD/001668/2023-2024 07/CMSD 02/01/2024 10 DIPALI CONSTRUCTION 0.92 0.00 0 100
4762 PURBA BARDHAMAN Purbasthali - I Central Mechanical MASGARIA PIPED WATER SUPPLY SCHEME , SM/13318 New Emergency installation (for urgent FHTC) at Masgaria Water Supply Scheme PH 2 (part-3) under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/001677/2023-2024 84/CMSD 15/01/2024 12 DIPALI CONSTRUCTION 0.80 0.00 0 100
4763 PURBA BARDHAMAN Purbasthali - I Burdwan Division MASGARIA PIPED WATER SUPPLY SCHEME , SM/13318 New Work Order for "CONSTRUCTION OF TEMPORARY KIOSK FOR THE NECESSARY ARRANGEMENT OF ELECTRIFICATION OF TUBEWELL FOR MASGARIA PWSS UNDER KALNA SUB-DIVISION UNDER BURDWN DIVISION, PHE DTE." Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/001145/2023-2024 1981/KSD 09/02/2024 10 ER CONSTRUCTION & GENERAL ORDER SUPPLIER 0.33 0.00 0 2
4764 PURBA BARDHAMAN Purbasthali - I Central Mechanical MASGARIA PIPED WATER SUPPLY SCHEME , SM/13318 New Supply and delivery of submersible pumping machinery (for urgent FHTC) for masgaria Water Supply Scheme PH 2 (part-2) under CMD, PHE Dte., Dist.- Purba-Bardhaman ASSISTANT ENGINEER JUNIOR ENGINEER ORD/001673/2023-2024 67/CMSD 11/01/2024 12 DIPALI CONSTRUCTION 0.85 0.00 0 100
4765 PURBA BARDHAMAN Purbasthali - I Burdwan Division MASGARIA PIPED WATER SUPPLY SCHEME , SM/13318 New Different works related (sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of different capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site) to KONRAPUR & MASGARIA Piped Water Supply Scheme under Purbasthali-I Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000026/2023-2024 1765/BWD 17/04/2023 365 M/S ASHA CONSTRUCTION 710.72 0.00 0 43
4766 PURBA BARDHAMAN Purbasthali - I Burdwan Division MASGARIA PIPED WATER SUPPLY SCHEME , SM/13318 New Providing left out FHTC at different places of Rajipur, Kansaripur village in order to declare swajal gram under the command area of Masgoria Piped water supply scheme within Kalna Sub-Division under Burdwan Division, PHE Dte Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000712/2024-2025 3718/BWD 29/10/2024 30 ER CONSTRUCTION & GENERAL ORDER SUPPLIER 8.45 0.00 0 0
4767 PURBA BARDHAMAN Purbasthali - I Burdwan Division MASGARIA PIPED WATER SUPPLY SCHEME , SM/13318 New Providing left out FHTC at different places of Bachpur village in order to declare swajal gram under the command area of Masgoria Piped water supply scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000713/2024-2025 3719/BWD 29/10/2024 30 ER CONSTRUCTION & GENERAL ORDER SUPPLIER 7.57 0.00 0 0
4768 PURBA BARDHAMAN Purbasthali - I Burdwan Division MASGARIA PIPED WATER SUPPLY SCHEME , SM/13318 New Providing leftout FHTC at different places of Malatipur village in order to declare swajal gram under the command area of Masgaria Piped Water Supply Scheme within Kalna Sub Division under Burdwan Division, PHE. Dte. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000764/2024-2025 3759/BWD 29/10/2024 30 IYASIN DAFADAR 7.80 0.00 0 0
4769 PURBA BARDHAMAN Purbasthali - I Burdwan Division MASGARIA PIPED WATER SUPPLY SCHEME , SM/13318 New Work order for Work order for "Providing left out FHTC at different places of Bhaidrapur village in order to declare swajal gram under the command area of Masgoria Piped water supply scheme within Kalna Sub-Division under Burdwan Division, PHE Dte." Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000836/2024-2025 1777/KSD 20/11/2024 30 IYASIN DAFADAR 4.89 0.00 0 1
4770 PURBA BARDHAMAN Purbasthali - I Burdwan Division MASGARIA PIPED WATER SUPPLY SCHEME , SM/13318 New Different types of balance works involve in connection with KONRAPUR (SM/13419) & MASGORIA (SM/13318) Piped water supply scheme under Purbasthali-I Block within Kalna Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/001028/2024-2025 142/BWD 08/01/2025 120 M/S ASHA CONSTRUCTION 65.74 0.00 0 0
4771 PURBA BARDHAMAN Purbasthali - I Central Mechanical MASGARIA PIPED WATER SUPPLY SCHEME , SM/13318 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Manganpur & others water supply scheme under Purbasthali 1 Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000714/2024-2025 2979/CMD 25/11/2024 90 H.K. DAS & CO. 53.27 0.00 0 0
4772 PURBA BARDHAMAN Kalna - II Burdwan Division BARA BAHARKULI PIPED WATER SUPPLY SCHEME. , SM/15581 New Material Requisition To Resource Division RTOR000050/2023-2024 1962/BWD 25/04/2023 Resource Division 10.04 0.00 0 0
4773 PURBA BARDHAMAN Kalna - II Burdwan Division BARA BAHARKULI PIPED WATER SUPPLY SCHEME. , SM/15581 New Material Requisition To Resource Division RTOR000200/2023-2024 2155/BWD 10/05/2023 Resource Division 10.94 0.00 0 0
4774 PURBA BARDHAMAN Kalna - II Central Mechanical BARA BAHARKULI PIPED WATER SUPPLY SCHEME. , SM/15581 New New service connection charges for Bara Baharkuli PWSS TW-2 BILL/01668/2023-2024 BP-2023-24-219 10/11/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 6.15 0.00 0 0
4775 PURBA BARDHAMAN Kalna - II Central Mechanical BARA BAHARKULI PIPED WATER SUPPLY SCHEME. , SM/15581 New Quotation for new electric service connection at Bara Baharkhuli PH NO.-1 BILL/01747/2023-2024 BP-2023-24-268 11/12/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 2.87 0.00 0 0
4776 PURBA BARDHAMAN Kalna - II Burdwan Division BARA BAHARKULI PIPED WATER SUPPLY SCHEME. , SM/15581 New Material Requisition To Resource Division RTOR000785/2023-2024 328/BWD 24/01/2024 Resource Division 24.62 0.00 0 0
4777 PURBA BARDHAMAN Kalna - II Burdwan Division BARA BAHARKULI PIPED WATER SUPPLY SCHEME. , SM/15581 New Restoration work of Barabaharkuli to Badla village road with a bridge over river Behula road from 0.0 km to 1.3 km and 1.8 km to 2.2 km damadged due to laying of underground water pipeline by PHE with box cutting and jhama with moorum consolidation under kalna highway subdivision of Burdwan south highway division ,P.W(Roads)dte ,during the year 2023-2024 BILL/00645/2024-2025 825/JJM 13/09/2024 EXECUTIVE ENGINEER BURDWAN SOUTH HIGHWAY DIVISION P.W. (ROADS) DTE. 5.36 0.00 0 null
4778 PURBA BARDHAMAN Kalna - II Burdwan Division BARA BAHARKULI PIPED WATER SUPPLY SCHEME. , SM/15581 New BARA BAHARKULI Piped Water Supply Scheme with sinking of Tube-well, LDS, Rising Main, FHTC, Construction of 100 cum capacity RCC OHR with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drain and internal pathway at different TW site under Kalna-II Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000178/2023-2024 2597/BWD 02/06/2023 365 INVENT ENGINEERS CO. OPERATIVE SOCIETY LTD. 236.30 73.41 31.07 65
4779 PURBA BARDHAMAN Kalna - II Burdwan Division BARA BAHARKULI PIPED WATER SUPPLY SCHEME. , SM/15581 New Pipeline laying by HDD method and different types of balance works in connection with different Augmentation & New Scheme [(SM/ 08103), (SM/13413), (SM/15587), (SM/16035), (SM/16287), (SM/16029), (SM/15581), (SM/14437), (SM/16028), (SM/16036) & (SM/14425)] within Kalna Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer ORD/001270/2024-2025 849/BWD 05/03/2025 180 S.P. CONSTRUCTION 683.30 0.00 0 0
4780 PURBA BARDHAMAN Kalna - II Central Mechanical BARA BAHARKULI PIPED WATER SUPPLY SCHEME. , SM/15581 New Supply & Installation of Submersible Pumping Machinery , Voltage Stabilizer, Chlorination system and internal House wiring for Tube well no.- 1 & 2 at BARABAHARKULI Water Supply Scheme [Block - KALNA-2] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER Junior Engineer ORD/000898/2023-2024 4162/CMD 29/08/2023 733 J.S. CONSTRUCTION. 21.33 0.00 0 90
4781 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Hatgobindapur Piped Water Supply Scheme , SM/06971 Retrofitting Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Hatgobindapur village of Hatgobindapur Piped Water Supply Scheme within Burdwan Sub-Divn. under Burdwan Division, PHE. Dte. [Phase - I] [GROUP : ¿6A¿] (T.R. No. 156/BWD/2020-21) ORD/000152/2020-2021 2743/BWD 10/08/2020 30 M/S ASHA CONSTRUCTION 4.92 4.92 100 1
4782 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Hatgobindapur Piped Water Supply Scheme , SM/06971 Retrofitting Continuation work order for Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Hatgobindapur village of Hatgobindapur piped water supply scheme within Burdwan Sub-Division under Burdwan Division, PHE Dte. [Phase-I](Tr No.-317/BWD/2020-21) Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. Junior Engineer, Burdwan Sadar Sub-Division ORD/000347/2020-2021 3702/BWD 05/10/2020 30 M/S ASHA CONSTRUCTION 4.92 4.92 100 1
4783 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Hatgobindapur Piped Water Supply Scheme , SM/06971 Retrofitting Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Banagram village of Hatgobindapur Piped Water Supply Scheme within Burdwan Sub-Divn. under Burdwan Division, PHE. Dte. [Phase - I] [GROUP : ¿6B¿] (T.R. No.-155/BWD/2020-21) ORD/000153/2020-2021 2744/BWD 10/08/2020 30 M/S ASHA CONSTRUCTION 4.92 4.92 100 1
4784 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Hatgobindapur Piped Water Supply Scheme , SM/06971 Retrofitting Continuation work order for Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Hatgobindapur village (Part) of Hatgobindapur Piped Water Supply Scheme within Burdwan Sub-Divn. under Burdwan Division, PHE. Dte. [SL. No. : 01] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. Junior Engineer, Burdwan Sadar Sub-Division ORD/000122/2021-2022 4390/BWD 31/08/2021 15 M/S ASHA CONSTRUCTION 4.86 3.48 71.6 1
4785 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Hatgobindapur Piped Water Supply Scheme , SM/06971 Retrofitting Supply of materials for different water supply scheme under Burdwan Division, PHE Dte. VCH/001246/2021-2022 900/DW 03/02/2022 EXECUTIVE ENGINEER, RESOURCES DIVISION, P.H.E. DTE. 34.54 0.00 0 0
4786 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Hatgobindapur Piped Water Supply Scheme , SM/06971 Retrofitting Extension of UPVC distribution pipeline in connection with FHTC for Hatgobindapur and its adjoining mouzas water supply scheme at Bardhaman-II Development Block under Burdwan Division, PHE Dte.[Gr-A] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. Junior Engineer, Burdwan Sadar Sub-Division ORD/000688/2021-2022 989/BSD 30/07/2021 30 M/S ASHA CONSTRUCTION 4.82 4.74 98.34 1
4787 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Hatgobindapur Piped Water Supply Scheme , SM/06971 Retrofitting Laying of interconnection of the Pump No.-3 with distribution line 100 mm dia for Hatgobindapur piped water supply scheme of Burdwan-II Block under Burdwan Division, PHE Dte.[Gr.-B] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. Junior Engineer, Burdwan Sadar Sub-Division ORD/000702/2021-2022 1027/BSD 05/08/2021 30 ANWESHA CONSTRUCTION 1.67 1.50 89.82 1
4788 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Hatgobindapur Piped Water Supply Scheme , SM/06971 Retrofitting Construction of boundary wall at Pump house no - 3 Site of Hatgobindapur Water Supply Scheme under Bardhaman-II Dev. Block of Burdwan Division, PHE Dte. (Length -40.00 Mtr, Col-16 Nos). Group : B Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. Junior Engineer, Burdwan Sadar Sub-Division ORD/000052/2022-2023 701/BSD 27/04/2022 45 ANIRUDDHA FARUQUE 2.61 2.61 100 1
4789 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Hatgobindapur Piped Water Supply Scheme , SM/06971 Retrofitting Sinking of additional Tube well 250 x 200 mm dia Tube well 150 mtr depth by D.R. Rig method using UPVC pipe (CD) and fibre glass strainer for Hatgobindapur piped water supply scheme (3rd tube well site), Block-Burdwan-II under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. Junior Engineer, Burdwan Sadar Sub-Division ORD/000982/2020-2021 1493/BWD 18/02/2021 30 C.M. ENTERPRISE 8.68 6.99 80.53 1
4790 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Hatgobindapur Piped Water Supply Scheme , SM/06971 Retrofitting Additional work for Construction of boundary wall at Pump house no - 3 Site of Hatgobindapur Water Supply Scheme under Bardhaman-II Dev. Block of Burdwan Division, PHE Dte. (Length -18.00 Mtr, Col-2 Nos). Group - A. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. Junior Engineer, Burdwan Sadar Sub-Division ORD/000061/2022-2023 722/BSD 02/05/2022 30 MOHAMMAD ISSA 1.48 1.48 100 1
4791 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Hatgobindapur Piped Water Supply Scheme , SM/06971 Retrofitting Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of HATGOBINDAPUR Piped Water Supply Scheme and its adjoining mouzas at Burdwan - II Block under Burdwan Division, PHE. Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. Junior Engineer, Burdwan Sadar Sub-Division ORD/000054/2022-2023 2232/BWD 29/04/2022 30 M/S ASHA CONSTRUCTION 19.32 18.67 96.64 1
4792 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Hatgobindapur Piped Water Supply Scheme , SM/06971 Retrofitting Providing leftout water tap connection in different villages for 100% coverage in Sajal Gram from existing distribution system within scheme jurisdiction of different Piped Water Supply Schemes within Burdwan ¿ II Block under Burdwan Division, PHE. Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000416/2021-2022 385/BWD 20/01/2022 30 BISWAS ENTERPRISE 11.97 3.71 30.99 100
4793 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Hatgobindapur Piped Water Supply Scheme , SM/06971 Retrofitting Left out FHTC (Hatgobindapur, Banagram, Ramnagar & Hatkanda village) of HATGOBINDAPUR PWSS under Burdwan-II Block of Burdwan Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. Junior Engineer, Burdwan Sadar Sub-Division ORD/000116/2023-2024 2302/BWD 19/05/2023 30 M/S SAYAN CHAKRABORTY 9.60 9.63 100.31 100
4794 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Hatgobindapur Piped Water Supply Scheme , SM/06971 Retrofitting Material Requisition To Resource Division RTOR000016/2021-2022 6800/BWD 07/12/2021 Resource Division 2.85 0.00 0 0
4795 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Hatgobindapur Piped Water Supply Scheme , SM/06971 Retrofitting Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Hatgobindapur village (Part) of Hatgobindapur Piped Water Supply Scheme within Burdwan Sub-Divn. under Burdwan Division, PHE. Dte. [SL. No. : 01] ORD/000465/2020-2021 1413/BWD 18/02/2021 15 M/S ASHA CONSTRUCTION 4.86 4.86 100 0
4796 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Hatgobindapur Piped Water Supply Scheme , SM/06971 Retrofitting Construction of Pump House cum chlorine room without sanitary and water supply arrangement at 3rd tube well site (Size-3.60 mtr x 3.00 mtr) for HATGOBINDAPUR water supply scheme under Burdwan-II development Block under Burdwan Sub-Division, under Burdwan Division, PHE Dte.[Gr.-A] ORD/000211/2021-2022 665/BSD 07/06/2021 45 KAJAL MUKHERJEE 2.76 2.71 98.19 0
4797 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Hatgobindapur Piped Water Supply Scheme , SM/06971 Retrofitting Providing left out FHTC for 100% covarage in different village within Hatgobindapur PWSS , Bardhhaman-II Development Block under Burdwan Division, PHE Dte Junior Engineer, Burdwan Sadar Sub-Division ORD/000293/2024-2025 1275/BSD 12/07/2024 45 PAL CONSTRUCTION 4.78 0.00 0 0
4798 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Hatgobindapur Piped Water Supply Scheme , SM/06971 Retrofitting Providing LDS in place of AC pipe line for HATGOBINDAPUR PWSS under Bardhaman-II Block within Burdwan Div. PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/001278/2024-2025 874/BWD 06/03/2025 90 DEY NIRMAN 35.37 0.00 0 0
4799 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) under the command area of Itla Piped Water Supply Scheme , SM/07549 Retrofitting Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of ITLA Piped Water Supply Scheme at Itla (Itla Adibasipara Habitation) & Sudipur (Sudipur Habitation) Village (Mouza), Jamalpur Block under Burdwan Division, PHE Dte. (Agreement No. 583/BWD OF 2020-2021.) AE(HQs) ORD/000275/2020-2021 545/BWD 22/01/2021 60 ANWESHA CONSTRUCTION 17.35 0.00 0 1
4800 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) under the command area of Itla Piped Water Supply Scheme , SM/07549 Retrofitting Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of ITLA Piped Water Supply Scheme at Bahadurpur (Bahadurpur Habitation) Village (Mouza), Jamalpur Block under Burdwan Division, PHE Dte. AE(HQs) ORD/000276/2020-2021 617/BWD 25/01/2021 60 A R TRADERS 19.81 0.00 0 1
4801 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) under the command area of Itla Piped Water Supply Scheme , SM/07549 Retrofitting Repairing and restoration of damaged and chokaged various dia UPVC pipeline and Construction of Valve chambers to control flow of water for providing FHTC in ITLA Piped W/S. Scheme at Jamalpur Dev Block under Burdwan Division ,P.H.E Dte._Gr-I AE(HQs) ORD/000667/2021-2022 147/AE/HQ 16/03/2022 20 BHARAT CONSTRUCTION 4.55 4.33 95.16 1
4802 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) under the command area of Itla Piped Water Supply Scheme , SM/07549 Retrofitting Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of ITLA Piped Water Supply Scheme at Itla (Itla Habitation) Village (Mouza), Jamalpur Block under Burdwan Division, PHE Dte. [Agreement No. 593/BWD OF 2020-2021] AE(HQs) ORD/000308/2020-2021 618/BWD 25/01/2021 60 JAYANTA CHAKRABORTY 18.36 11.65 63.45 1
4803 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) under the command area of Itla Piped Water Supply Scheme , SM/07549 Retrofitting Interconnection between inlet & delivery pipe with main distribution pipeline within command area of ITLA Piped W/S. Scheme, Jamalpur Block under Burdwan Division, PHE. Dte. AE(HQs) J.E. 2 BURDWAN ORD/000825/2022-2023 213/AE/HQ 31/03/2023 30 BHARAT CONSTRUCTION 0.87 0.00 0 0
4804 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) under the command area of Itla Piped Water Supply Scheme , SM/07549 Retrofitting Laying of uPVC pipe for providing FHTC at Itla Village within Itla Piped Water Supply Scheme, Jamalpur Block under Burdwan Division P.H.E Dte. [Group : E] AE(HQs) ORD/000489/2021-2022 66/AE/HQ 11/02/2022 30 MAUVE ENGINEERING AND SERVICES PVT LTD 4.73 4.73 100 100
4805 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) under the command area of Itla Piped Water Supply Scheme , SM/07549 Retrofitting Re-Laying of UPVC Pipeline (damaged by Local Irrigation Work) for providing FHTC at Bag Kalapahar Mouza (Habitation) under ITLA Piped Water Supply Scheme, Jamalpur Development Block under Burdwan Division, PHE Dte. AE(HQs) Junior Engineer, Burdwan Division ORD/000903/2023-2024 5513/BWD 14/12/2023 30 UTPAL NANDI 8.61 0.00 0 100
4806 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) under the command area of Itla Piped Water Supply Scheme , SM/07549 Retrofitting Interconnection between OHR & Delivery line at Head Works site under ITLA PWSS, Jamalpur Dev. Block under Burdwan Division, PHE Dte. AE(HQs) Junior Engineer, Burdwan Division ORD/000629/2024-2025 747/AE/HQ 13/09/2024 30 DEBJYOTI GOSWAMI 0.80 0.00 0 100
4807 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) under the command area of Itla Piped Water Supply Scheme , SM/07549 Retrofitting Construction of Boundary wall, Land Development for various PWSS, Block- Jamalpur, District:- Purba-Bardhaman within Burdwan Sub Division under Burdwan Division PHE Dte. AE(HQs) ORD/001100/2024-2025 433/BWD 20/01/2025 120 RABINDRA NATH GORANG 132.64 0.00 0 0
4808 PURBA BARDHAMAN Mangolkote Burdwan Division KHERUA PIPED WATER SUPPLY SCHEME , SM/15240 New Material Requisition To Resource Division RTOR000059/2022-2023 1245/BWD 17/03/2023 Resource Division 9.37 0.00 0 0
4809 PURBA BARDHAMAN Mangolkote Burdwan Division KHERUA PIPED WATER SUPPLY SCHEME , SM/15240 New Material Requisition To Resource Division RTOR000099/2022-2023 1639/BWD 06/04/2023 Resource Division 1.38 0.00 0 0
4810 PURBA BARDHAMAN Mangolkote Central Mechanical KHERUA PIPED WATER SUPPLY SCHEME , SM/15240 New New service connection charges of Kherua W/S Scheme TW-1 BILL/00688/2023-2024 BP-2023-24-33 26/06/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 4.59 0.00 0 0
4811 PURBA BARDHAMAN Mangolkote Central Mechanical KHERUA PIPED WATER SUPPLY SCHEME , SM/15240 New Additional quotation for New service connection charges for Kherua PWSS TW-2 BILL/01348/2023-2024 BP-2023-24-128 21/08/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 0.03 0.00 0 0
4812 PURBA BARDHAMAN Mangolkote Central Mechanical KHERUA PIPED WATER SUPPLY SCHEME , SM/15240 New New service connection charges for Kherua PWSS TW-2 BILL/01263/2023-2024 BP-2023-24-124 18/08/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 5.67 0.00 0 0
4813 PURBA BARDHAMAN Mangolkote Burdwan Division KHERUA PIPED WATER SUPPLY SCHEME , SM/15240 New Material Requisition To Resource Division RTOR000706/2023-2024 5045/BWD 23/11/2023 Resource Division 20.46 0.00 0 0
4814 PURBA BARDHAMAN Mangolkote Burdwan Division KHERUA PIPED WATER SUPPLY SCHEME , SM/15240 New Different works related (sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of different capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site) to GOHAGRAM, KHERUA & JABAGRAM Piped Water Supply Scheme under Mangalkote Block, District:- Purba Bardhaman [NEW SCHEME] Assistant Engineer JUNIOR ENGINEER KATWA SUB-DIVISION PHE DTE,JUNIOR ENGINEER R.W.S. BURDWAN SUB-DIVISION PHE DTE ORD/000697/2022-2023 582/BWD 17/02/2023 365 PUSPA ENTERPRISE 1,185.88 0.00 0 73
4815 PURBA BARDHAMAN Mangolkote Central Mechanical KHERUA PIPED WATER SUPPLY SCHEME , SM/15240 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Jabagram & others water supply scheme under Mangalkote Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. Driller In-Charge Junior Engineer ORD/000118/2024-2025 2590/CMD 27/08/2024 90 M/S SAJAHAN CHOWDHURY 62.06 0.00 0 0
4816 PURBA BARDHAMAN Mangolkote Central Mechanical KHERUA PIPED WATER SUPPLY SCHEME , SM/15240 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at KHERUA Water Supply Scheme [ Block- MONGOLKOTE] under CMD, PHE Dte., Dist.- Purba-Bardhaman. Driller In-Charge Junior Engineer ORD/000047/2023-2024 2510/CMD 02/06/2023 30 GOENKA ENTERPRISE 26.97 10.04 37.23 100
4817 PURBA BARDHAMAN Mangolkote Burdwan Division KHERUA PIPED WATER SUPPLY SCHEME , SM/15240 New Providing left out FHTC at different places of Kherua village in order to declare swajal gram under the command area of Kherua Piped water supply scheme within (SM/ 15240) Katwa Sub-Division under Burdwan Division, PHE Dte.(Sl No-1) ORD/001254/2024-2025 336/KTS 05/03/2025 15 CHANCHAL PAL 4.25 0.00 0 0
4818 PURBA BARDHAMAN Mangolkote Burdwan Division KHERUA PIPED WATER SUPPLY SCHEME , SM/15240 New Providing left out FHTC at different places of Kowarpur village in order to declare swajal gram under the command area of Kherua Piped water supply scheme (SM/15240) within Katwa Sub-Division under Burdwan Division, PHE Dte.(Sl No-3) ORD/001256/2024-2025 338/KTS 05/03/2025 15 CHANCHAL PAL 3.40 0.00 0 0
4819 PURBA BARDHAMAN Mangolkote Burdwan Division KHERUA PIPED WATER SUPPLY SCHEME , SM/15240 New Providing left out FHTC at different places of Sanri village in order to declare swajal gram under the command area of Kherua Piped water supply scheme (SM/15240) within Katwa Sub-Division under Burdwan Division, PHE Dte.(Sl No-2) ORD/001255/2024-2025 337/KTS 05/03/2025 15 BABUL SK 3.66 0.00 0 0
4820 PURBA BARDHAMAN Mangolkote Burdwan Division KHERUA PIPED WATER SUPPLY SCHEME , SM/15240 New Different types of works involve in connection with implementation of Gohgram, Jabagram, Kherua, Lakshmipur & Simulia Piped Water Supply Scheme under Mongolkote Block within Katwa Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer ORD/001301/2024-2025 936/BWD 11/03/2025 180 M/S GHOSH CONSTRUCTION 360.68 0.00 0 0
4821 PURBA BARDHAMAN Central Mechanical DETAILED PROJECT REPORT FOR AUGMENTATION OF BORSHUL ZONE I PWSS BURDWAN II PURBA BARDHAMAN , SM/15309 Augmentation New service connection charges for Borshul PWSS Z-I TW-1 BILL/01412/2023-2024 BP-2023-24-141 28/08/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 5.00 0.00 0 0
4822 PURBA BARDHAMAN Central Mechanical DETAILED PROJECT REPORT FOR AUGMENTATION OF BORSHUL ZONE I PWSS BURDWAN II PURBA BARDHAMAN , SM/15309 Augmentation New service connection charges for Borshul PWSS Z-I TW-2 BILL/01413/2023-2024 BP-2023-24-142 28/08/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.63 0.00 0 0
4823 PURBA BARDHAMAN Burdwan Division DETAILED PROJECT REPORT FOR AUGMENTATION OF BORSHUL ZONE I PWSS BURDWAN II PURBA BARDHAMAN , SM/15309 Augmentation Sinking of 250 X 150mm dia Tube Well 150 mtr. Depth by D.R. Rig method using UPVC pipe (CD) and UPVC Deep Well Screen (RDS) at Head Works & 2nd Tube well Site for BORSHUL (Zone-I) Piped Water Supply Scheme, Block - Burdwan - II, Dist - Purba Bardhaman under Burdwan Division, PHE Dte. [For 02 Nos. Tube well]. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. Junior Engineer, Burdwan Sadar Sub-Division ORD/000193/2023-2024 2691/BWD 08/06/2023 45 J K CORPORATION 19.84 18.99 95.72 100
4824 PURBA BARDHAMAN Burdwan Division DETAILED PROJECT REPORT FOR AUGMENTATION OF BORSHUL ZONE I PWSS BURDWAN II PURBA BARDHAMAN , SM/15309 Augmentation Construction of Pump House cum chlorine room without sanitary and water supply arrangement at 2nd Tube Well Site to departmental drawing no-PHE/BD/P.H/DRG/02/DEC-17 (Size3.60mtrx3.00mtr room) for Barsul Zone-1 its Adjoining Mouza W/S Scheme, Block -Burdwan-II within Burdwan Sub-Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. Junior Engineer, Burdwan Sadar Sub-Division ORD/000575/2023-2024 2040/BSD 24/08/2023 45 DEBJYOTI GOSWAMI 3.19 1.30 40.75 100
4825 PURBA BARDHAMAN Central Mechanical DETAILED PROJECT REPORT FOR AUGMENTATION OF BORSHUL ZONE I PWSS BURDWAN II PURBA BARDHAMAN , SM/15309 Augmentation Supply & Installation of Submersible Pumping Machinery , Voltage Stabilizer, Chlorination system and internal House wiring of Tube Well No- 01, 02 & 03 at Augmentation Borsul (Zone-I) [Block ¿Burdwan -2] Water Supply Scheme under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER Junior Engineer ORD/000917/2022-2023 1081/CMD 03/03/2023 30 CHOUDHURY ENTERPRISE 35.02 5.72 16.33 40
4826 PURBA BARDHAMAN Burdwan Division DETAILED PROJECT REPORT FOR AUGMENTATION OF BORSHUL ZONE I PWSS BURDWAN II PURBA BARDHAMAN , SM/15309 Augmentation Construction of boundary wall at 2ND TUBE WELL Site & Sanitary of BARSUL Zone-I Piped W/S. Scheme under Burdwan-II Block of Burdwan Division, PHE Dte. (Length =80.00 Mtr, Col-27 Nos). Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. Junior Engineer, Burdwan Sadar Sub-Division ORD/000473/2024-2025 3133/BWD 16/08/2024 212 SK BADIUZZAMAL 5.77 0.00 0 100
4827 PURBA BARDHAMAN Burdwan Division DETAILED PROJECT REPORT FOR AUGMENTATION OF BORSHUL ZONE I PWSS BURDWAN II PURBA BARDHAMAN , SM/15309 Augmentation Augmentation of Borshul (Zone-I) Piped Water Supply Scheme (Mouzas:- Barshul, Tatkhanda & Dakshin Goplapur) with LDS, FHTC, Rising main, Construction of 250 cum capacity OHR with 20.0 mtr. Staging height inclusive of soil investigation under BARDHAMAN- II Block, District:- Purba-Burdwan. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. Junior Engineer, Burdwan Sadar Sub-Division ORD/000700/2022-2023 616/BWD 17/02/2023 683 ASHOK KUMAR GHOSH 331.77 144.73 43.62 51
4828 PURBA BARDHAMAN Burdwan Division DETAILED PROJECT REPORT FOR AUGMENTATION OF BORSHUL ZONE I PWSS BURDWAN II PURBA BARDHAMAN , SM/15309 Augmentation Construction of pump house including plinth protection with surface drain at Head Work TW site for (3.6 mtr. x 3.0 mtr. Size) Borshul Zone-I water supply schemes, Block-Burdwan-II within Burdwan Division, PHE Dte. Dist.-Purba Bardhaman. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. Junior Engineer, Burdwan Sadar Sub-Division ORD/000970/2023-2024 006/BWD 02/01/2024 364 DAWN ASSOCIATES 4.53 0.00 0 100
4829 PURBA BARDHAMAN Burdwan Division DETAILED PROJECT REPORT FOR AUGMENTATION OF BORSHUL ZONE I PWSS BURDWAN II PURBA BARDHAMAN , SM/15309 Augmentation Different Types of work involved in connection with different Augmentation & New Schemes (11 Nos.) Piped Water Supply Scheme under Burdwan II Block within Burdwan Sub-Div., under Burdwan Division PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/001349/2024-2025 1060/BWD 25/03/2025 120 R.G. INFRASTRUCTURE 262.23 0.00 0 0
4830 PURBA BARDHAMAN Burdwan Division DETAILED PROJECT REPORT FOR AUGMENTATION OF BORSHUL ZONE I PWSS BURDWAN II PURBA BARDHAMAN , SM/15309 Augmentation Construction of boundary wall at 1ST TUBE WALL (HEAD WORK) Site of BARSUL Zone-I Piped W/S. Scheme under Burdwan-II Block of Burdwan Division, PHE Dte. Length =100.00 Mtr, Col-35 Nos). Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. Junior Engineer, Burdwan Sadar Sub-Division ORD/000277/2024-2025 2692/BWD 10/07/2024 172 RAHAMAN ENTERPRISE 6.80 0.00 0 100
4831 PURBA BARDHAMAN Purbasthali - I Burdwan Division BHANDARITURI PIPED WATER SUPPLY SCHEME , SM/14925 New Material Requisition To Resource Division RTOR000142/2023-2024 2155/BWD 10/05/2023 Resource Division 15.82 0.00 0 0
4832 PURBA BARDHAMAN Purbasthali - I Burdwan Division BHANDARITURI PIPED WATER SUPPLY SCHEME , SM/14925 New Material Requisition To Resource Division RTOR000416/2023-2024 3866/BWD 01/09/2023 Resource Division 0.23 0.00 0 0
4833 PURBA BARDHAMAN Purbasthali - I Central Mechanical BHANDARITURI PIPED WATER SUPPLY SCHEME , SM/14925 New New service connection charges for Bhandarituri PWSS TW-1 BILL/01535/2023-2024 BP-2023-24-202 18/10/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 5.82 0.00 0 0
4834 PURBA BARDHAMAN Purbasthali - I Burdwan Division BHANDARITURI PIPED WATER SUPPLY SCHEME , SM/14925 New Material Requisition To Resource Division RTOR000797/2023-2024 312/BWD 24/01/2024 Resource Division 7.05 0.00 0 0
4835 PURBA BARDHAMAN Purbasthali - I Central Mechanical BHANDARITURI PIPED WATER SUPPLY SCHEME , SM/14925 New Supply & Installation of Submersible Pumping Machinery , Voltage Stabilizer, Chlorination System and Internal House wiring for Tube well no.- 1 & 2 at BHANDARITURI Water Supply Scheme [Block - PURBASTHALI-1] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000816/2023-2024 4096/CMD 29/08/2023 30 KAMAKHYA ENTERPRISE 20.75 0.00 0 60
4836 PURBA BARDHAMAN Purbasthali - I Burdwan Division BHANDARITURI PIPED WATER SUPPLY SCHEME , SM/14925 New BHANDARTIKURI Piped Water Supply Scheme with sinking of Tube-well, LDS, Rising Main, FHTC, with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drain and internal pathway at different TW site under Purbasthali-I Block, District:- Purba-Bardhaman [NEW SCHEME]. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000758/2022-2023 1280/BWD 20/03/2023 90 NANDANIK ENGINEERS CO-OPERATIVE SOCIETY LTD. 65.35 21.86 33.45 100
4837 PURBA BARDHAMAN Purbasthali - I Burdwan Division BHANDARITURI PIPED WATER SUPPLY SCHEME , SM/14925 New Different types of works involve in connection with Augmentation of DIRGHAPARA (SM/07804) Water Supply Scheme, MOUDANGA (SM/ 14020) Water supply Scheme & BHANDARTIKURI (SM/14925) Water Supply Scheme under Burdwan Division, PHE Dte. Assistant Engineer ORD/000357/2024-2025 2912/BWD 25/07/2024 120 BANSBERIA CONSTRUCTION CO. 293.38 0.00 0 0
4838 PURBA BARDHAMAN Purbasthali - I Central Mechanical BHANDARITURI PIPED WATER SUPPLY SCHEME , SM/14925 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Haripur & others water supply scheme under purbasthali 1 Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000072/2024-2025 2397/CMD 02/08/2024 90 CHATTERJEE ENTERPRISE 48.60 0.00 0 0
4839 PURBA BARDHAMAN Purbasthali - I Burdwan Division BHANDARITURI PIPED WATER SUPPLY SCHEME , SM/14925 New Work order for "Restoration of Concrete Roads & other allied works , at Barishalpara,Habitation-Bhandartikuri,G.P-Jahannagar, in the command area of BHANDARTIKURI PWSS (SM/14925) ,BLOCK-Purbasthali -1 , under Kalna Sub-Division under Burdwan Division, PHE Dte.". Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/001320/2024-2025 389/KSD 10/03/2025 10 ER CONSTRUCTION & GENERAL ORDER SUPPLIER 0.96 0.00 0 0
4840 PURBA BARDHAMAN Burdwan - II Burdwan Division BAMCHANDRAPUR PIPED WATER SUPPLY SCHEME , SM/14965 New Material Requisition To Resource Division RTOR000226/2023-2024 2155/BWD 10/05/2023 Resource Division 4.92 0.00 0 0
4841 PURBA BARDHAMAN Burdwan - II Burdwan Division BAMCHANDRAPUR PIPED WATER SUPPLY SCHEME , SM/14965 New Material Requisition To Resource Division RTOR000496/2023-2024 4020/BWD 08/09/2023 Resource Division 0.41 0.00 0 0
4842 PURBA BARDHAMAN Burdwan - II Central Mechanical BAMCHANDRAPUR PIPED WATER SUPPLY SCHEME , SM/14965 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at Bamchandrapur Water Supply Scheme [ Block- Burdwan-2 ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER Junior Engineer ORD/000734/2023-2024 4044/CMD 29/08/2023 30 S.K. ENTERPRISE 30.08 0.00 0 0
4843 PURBA BARDHAMAN Burdwan - II Burdwan Division BAMCHANDRAPUR PIPED WATER SUPPLY SCHEME , SM/14965 New Material Requisition To Resource Division RTOR000651/2023-2024 5113/BWD 23/11/2023 Resource Division 20.46 0.00 0 0
4844 PURBA BARDHAMAN Burdwan - II Central Mechanical BAMCHANDRAPUR PIPED WATER SUPPLY SCHEME , SM/14965 New New Service connection for Bamchandrapur PWSS TW-2. BILL/02893/2023-2024 BP-2023-24-626 07/03/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 6.71 0.00 0 0
4845 PURBA BARDHAMAN Burdwan - II Central Mechanical BAMCHANDRAPUR PIPED WATER SUPPLY SCHEME , SM/14965 New New Service connection for Bamchandrapur PWSS TW-1. BILL/02894/2023-2024 BP-2023-24-627 07/03/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 4.75 0.00 0 0
4846 PURBA BARDHAMAN Burdwan - II Central Mechanical BAMCHANDRAPUR PIPED WATER SUPPLY SCHEME , SM/14965 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at KUSHA & others water supply scheme under Bardhaman-II Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman ASSISTANT ENGINEER Junior Engineer ORD/000065/2024-2025 2389/CMD 02/08/2024 90 DILIP MAHATO 53.14 0.00 0 0
4847 PURBA BARDHAMAN Burdwan - II Burdwan Division BAMCHANDRAPUR PIPED WATER SUPPLY SCHEME , SM/14965 New BAMCHANDRAPUR Piped Water Supply Scheme with sinking of Tube-well, LDS, Construction of 150 cum RCC OHR with 20 mtr. staging height including soil testing, Rising Main, FHTC & construction of switch rooms & boundary walls with gates and land development, drain and internal pathway at different TW site under Burdwan-II Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. Junior Engineer, Burdwan Sadar Sub-Division ORD/000196/2023-2024 2701/BWD 08/06/2023 573 M/S PROCHESTA ENTERPRISE 254.91 0.00 0 15
4848 PURBA BARDHAMAN Mangolkote Burdwan Division KUNDA PIPED WATER SUPPLY SCHEME , SM/14913 New Material Requisition To Resource Division RTOR000116/2023-2024 1965/BWD 26/04/2023 Resource Division 1.64 0.00 0 0
4849 PURBA BARDHAMAN Mangolkote Burdwan Division KUNDA PIPED WATER SUPPLY SCHEME , SM/14913 New Material Requisition To Resource Division RTOR000148/2023-2024 2155/BWD 10/05/2023 Resource Division 12.34 0.00 0 0
4850 PURBA BARDHAMAN Mangolkote Central Mechanical KUNDA PIPED WATER SUPPLY SCHEME , SM/14913 New New service connection charges of Kunda W/S Scheme TW-1 BILL/00689/2023-2024 BP-2023-24-34 26/06/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 2.56 0.00 0 0
4851 PURBA BARDHAMAN Mangolkote Burdwan Division KUNDA PIPED WATER SUPPLY SCHEME , SM/14913 New Material Requisition To Resource Division RTOR000813/2023-2024 302/BWD 24/01/2024 Resource Division 14.25 0.00 0 0
4852 PURBA BARDHAMAN Mangolkote Burdwan Division KUNDA PIPED WATER SUPPLY SCHEME , SM/14913 New KUNDA Piped Water Supply Scheme with sinking of Tube-well, LDS, Rising Main, FHTC, construction of switch rooms & boundary walls with gates and land development, drain and internal pathway at Brahmapur, Jartha village (J.L No -76, 75) under Mongolkote Block, District:- Purba-Bardhaman [NEW SCHEME]. Assistant Engineer JUNIOR ENGINEER R.W.S. BURDWAN SUB-DIVISION PHE DTE ORD/000775/2022-2023 1341/BWD 22/03/2023 90 KHEPIMA ENGINEERS CO. OPERATIVE SOCIETY LTD. 57.05 46.50 81.51 60
4853 PURBA BARDHAMAN Mangolkote Burdwan Division KUNDA PIPED WATER SUPPLY SCHEME , SM/14913 New KUNDA Piped Water Supply Scheme with balance LDS and FHTC at Kunda village, J.L No- 74 under Mongolkote Block, District:- Purba-Bardhaman. [NEW SCHEME]. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE,JUNIOR ENGINEER R.W.S. BURDWAN SUB-DIVISION PHE DTE ORD/000095/2023-2024 2232/BWD 16/05/2023 90 ASMA ENTERPRISE 32.47 6.43 19.8 35
4854 PURBA BARDHAMAN Mangolkote Central Mechanical KUNDA PIPED WATER SUPPLY SCHEME , SM/14913 New Supply & Installation of Submersible Pumping Machinery , Voltage Stabilizer, Chlorination system and internal House wiring for Tube well no.- 1 & 2 at KUNDA Water Supply Scheme [Block - MANGALKOTE] under CMD, PHE Dte., Dist.- Purba-Bardhaman. Driller In-Charge Junior Engineer ORD/000056/2023-2024 2518/CMD 02/06/2023 30 M/S. S.R. ENTERPRISE 21.04 9.40 44.68 40
4855 PURBA BARDHAMAN Mangolkote Central Mechanical KUNDA PIPED WATER SUPPLY SCHEME , SM/14913 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Jabagram & others water supply scheme under Mangalkote Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. Driller In-Charge Junior Engineer ORD/000118/2024-2025 2590/CMD 27/08/2024 90 M/S SAJAHAN CHOWDHURY 62.06 0.00 0 0
4856 PURBA BARDHAMAN Mangolkote Burdwan Division KUNDA PIPED WATER SUPPLY SCHEME , SM/14913 New Balance works for different type of works in connection with Jaggeswardihi PWSS, Deulia PWSS, Kunda PWSS and Gohagram PWSS Under Mongalkote Block within Katwa Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer ORD/001186/2024-2025 593/BWD 07/02/2025 120 MD HASIN 203.38 0.00 0 0
4857 PURBA BARDHAMAN Ketugram - I Burdwan Division SHRIGRAM PIPED WATER SUPPLY SCHEME , SM/14915 New Material Requisition To Resource Division RTOR000312/2023-2024 2197/BWD 12/05/2023 Resource Division 12.32 0.00 0 0
4858 PURBA BARDHAMAN Ketugram - I Burdwan Division SHRIGRAM PIPED WATER SUPPLY SCHEME , SM/14915 New Material Requisition To Resource Division RTOR000486/2023-2024 4010/BWD 08/09/2023 Resource Division 0.28 0.00 0 0
4859 PURBA BARDHAMAN Ketugram - I Central Mechanical SHRIGRAM PIPED WATER SUPPLY SCHEME , SM/14915 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at SHRIGRAM Water Supply Scheme [ Block- KETUGRAM-1] under CMD, PHE Dte., Dist.- Purba-Bardhaman. Driller In-Charge Junior Engineer ORD/000832/2023-2024 4109/CMD 29/08/2023 30 DUTTA ENTERPRISE 26.96 0.00 0 0
4860 PURBA BARDHAMAN Ketugram - I Burdwan Division SHRIGRAM PIPED WATER SUPPLY SCHEME , SM/14915 New Material Requisition To Resource Division RTOR000760/2023-2024 5245/BWD 30/11/2023 Resource Division 18.90 0.00 0 0
4861 PURBA BARDHAMAN Ketugram - I Central Mechanical SHRIGRAM PIPED WATER SUPPLY SCHEME , SM/14915 New Quotation for new service connection at Shrigram PWSS PH-1. BILL/00417/2024-2025 BP-2024-25-221 26/07/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.40 0.00 0 0
4862 PURBA BARDHAMAN Ketugram - I Central Mechanical SHRIGRAM PIPED WATER SUPPLY SCHEME , SM/14915 New Quotation for new service connection at Shrigram PWSS PH-2. BILL/00416/2024-2025 BP-2024-25-222 26/07/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 4.77 0.00 0 0
4863 PURBA BARDHAMAN Ketugram - I Central Mechanical SHRIGRAM PIPED WATER SUPPLY SCHEME , SM/14915 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Rajur & others water supply scheme under Ketugram-I Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. Driller In-Charge Junior Engineer ORD/000098/2024-2025 2407/CMD 02/08/2024 90 M.S. ENTERPRISE 82.29 0.00 0 0
4864 PURBA BARDHAMAN Ketugram - I Burdwan Division SHRIGRAM PIPED WATER SUPPLY SCHEME , SM/14915 New Balance work for OHR, extension of pipeline to provide FHTC with sinking of tube well, construction of pump house, boundary wall, land development, plinth protection for pump house, approach road & other related work under Chakta, Mahula, Rajoor and Srigram PWSS under Katwa Sub Division, Block- Ketugram-I, Burdwan Division PHE Dte. Assistant Engineer JUNIOR ENGINEER R.W.S. BURDWAN SUB-DIVISION PHE DTE ORD/000284/2024-2025 2721/BWD 11/07/2024 120 ESCON INDIA 139.35 0.00 0 70
4865 PURBA BARDHAMAN Ketugram - I Burdwan Division SHRIGRAM PIPED WATER SUPPLY SCHEME , SM/14915 New SHRIGRAM Piped Water Supply Scheme with sinking of Tube-well, LDS, Rising Main, FHTC, Construction of 200 cum capacity RCC OHR with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drain and internal pathway at different TW site under KETUGRAM -I Block, District:- Purba- Bardhaman [NEW SCHEME] Assistant Engineer JUNIOR ENGINEER R.W.S. BURDWAN SUB-DIVISION PHE DTE ORD/000141/2023-2024 2385/BWD 23/05/2023 365 S.D. CONSTRUCTION 351.47 0.00 0 43
4866 PURBA BARDHAMAN Mangolkote Burdwan Division KHARIJA KASHIGRAM PIPED WATER SUPPLY SCHEME , SM/14916 New Material Requisition To Resource Division RTOR000111/2023-2024 1965/BWD 26/04/2023 Resource Division 2.74 0.00 0 0
4867 PURBA BARDHAMAN Mangolkote Burdwan Division KHARIJA KASHIGRAM PIPED WATER SUPPLY SCHEME , SM/14916 New Material Requisition To Resource Division RTOR000383/2023-2024 2197/BWD 12/05/2023 Resource Division 22.26 0.00 0 0
4868 PURBA BARDHAMAN Mangolkote Central Mechanical KHARIJA KASHIGRAM PIPED WATER SUPPLY SCHEME , SM/14916 New New service connection charges for Kharija Kashigram PWSS TW-1 BILL/01770/2023-2024 BP-2023-24-275 21/12/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 7.81 0.00 0 0
4869 PURBA BARDHAMAN Mangolkote Burdwan Division KHARIJA KASHIGRAM PIPED WATER SUPPLY SCHEME , SM/14916 New Material Requisition To Resource Division RTOR000811/2023-2024 301/BWD 24/01/2024 Resource Division 20.47 0.00 0 0
4870 PURBA BARDHAMAN Mangolkote Central Mechanical KHARIJA KASHIGRAM PIPED WATER SUPPLY SCHEME , SM/14916 New NEW SERVICE CONNECTION FOR KHARIJA KASHIGRAM PWSS PH-2 BILL/00192/2024-2025 BP-2024-25-91 17/05/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 4.45 0.00 0 0
4871 PURBA BARDHAMAN Mangolkote Burdwan Division KHARIJA KASHIGRAM PIPED WATER SUPPLY SCHEME , SM/14916 New Supply of 1 (one) No. Inspection Vehicle for different JJM Related Works as and when required including supply of driver and fuels (Minimum 8 Hours of duty) under Katwa Sub-Division within Burdwan Division, P.H.E. Dte. Consider 96.00 Km run per Day. Assistant Engineer JUNIOR ENGINEER KATWA SUB-DIVISION PHE DTE ORD/001080/2023-2024 22/KTS 05/01/2024 70 AJIT SAMANTA 0.90 0.00 0 100
4872 PURBA BARDHAMAN Mangolkote Central Mechanical KHARIJA KASHIGRAM PIPED WATER SUPPLY SCHEME , SM/14916 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Jabagram & others water supply scheme under Mangalkote Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. Driller In-Charge Junior Engineer ORD/000118/2024-2025 2590/CMD 27/08/2024 90 M/S SAJAHAN CHOWDHURY 62.06 0.00 0 0
4873 PURBA BARDHAMAN Mangolkote Burdwan Division KHARIJA KASHIGRAM PIPED WATER SUPPLY SCHEME , SM/14916 New Different works related (sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of different capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site) to DEULIA, GOBARDHANPUR, KHARIJA-KASHIGRAM & UNIATATARPUR Piped Water Supply Scheme under Mangolkote Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer JUNIOR ENGINEER KATWA SUB-DIVISION PHE DTE ORD/000477/2023-2024 3491/BWD 09/08/2023 815 POWER TOOLS & ENGINEERING 1,741.05 0.00 0 10
4874 PURBA BARDHAMAN Mangolkote Central Mechanical KHARIJA KASHIGRAM PIPED WATER SUPPLY SCHEME , SM/14916 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at KHARIJA KASHIGRAM Water Supply Scheme [ Block-MONGOLKOTE ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. Driller In-Charge Junior Engineer ORD/000778/2023-2024 4072/CMD 29/08/2023 640 SOUNAK ENTERPRISE 27.79 0.00 0 48
4875 PURBA BARDHAMAN Raina - I Burdwan Division HARISHNAPUR PIPED WATER SUPPLY SCHEME , SM/15319 New Material Requisition To Resource Division RTOR000275/2023-2024 2197/BWD 12/05/2023 Resource Division 8.85 0.00 0 0
4876 PURBA BARDHAMAN Raina - I Burdwan Division HARISHNAPUR PIPED WATER SUPPLY SCHEME , SM/15319 New Material Requisition To Resource Division RTOR000481/2023-2024 4005/BWD 08/09/2023 Resource Division 10.43 0.00 0 0
4877 PURBA BARDHAMAN Raina - I Central Mechanical HARISHNAPUR PIPED WATER SUPPLY SCHEME , SM/15319 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at Harishnapur Water Supply Scheme [ Block- Raina-1 ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000721/2023-2024 4032/CMD 29/08/2023 30 SUBRATA BHADRA 28.96 0.00 0 0
4878 PURBA BARDHAMAN Raina - I Burdwan Division HARISHNAPUR PIPED WATER SUPPLY SCHEME , SM/15319 New Material Requisition To Resource Division RTOR000670/2023-2024 5084/BWD 23/11/2023 Resource Division 20.46 0.00 0 0
4879 PURBA BARDHAMAN Raina - I Central Mechanical HARISHNAPUR PIPED WATER SUPPLY SCHEME , SM/15319 New New Service connection at HARISHNAPUR, PWSS. BILL/02358/2023-2024 BP-2023-24-483 31/01/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.37 0.00 0 0
4880 PURBA BARDHAMAN Raina - I Central Mechanical HARISHNAPUR PIPED WATER SUPPLY SCHEME , SM/15319 New New service connection charges for Harishnapur PWSS TW-01 BILL/02411/2023-2024 BP-2023-24-495 06/02/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.92 0.00 0 0
4881 PURBA BARDHAMAN Raina - I Burdwan Division HARISHNAPUR PIPED WATER SUPPLY SCHEME , SM/15319 New Different works related (sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of different capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site) to BAJITPUR, SHUKUR & HARISHNAPUR Piped Water Supply Scheme under RAINA-I Block, District:- Purba Bardhaman [NEW SCHEME] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000388/2023-2024 3197/BWD 24/07/2023 365 MRITYUNJOY MUKHERJEE & CO. 1,242.03 0.00 0 30
4882 PURBA BARDHAMAN Raina - I Central Mechanical HARISHNAPUR PIPED WATER SUPPLY SCHEME , SM/15319 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Bajitpur, Belsar & other water supply scheme under Raina-1 Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000117/2024-2025 2589/CMD 27/08/2024 90 DEY ENTERPRISE 74.58 0.00 0 0
4883 PURBA BARDHAMAN Raina - I Burdwan Division HARISHNAPUR PIPED WATER SUPPLY SCHEME , SM/15319 New Material Requisition To Resource Division RTOR000094/2024-2025 420/BWD 17/01/2025 Resource Division 2.65 0.00 0 0
4884 PURBA BARDHAMAN Katwa - II Burdwan Division MAKHALTOR PIPED WATER SUPPLY SCHEME , SM/15153 New Material Requisition To Resource Division RTOR000064/2022-2023 1260/BWD 17/03/2023 Resource Division 6.59 0.00 0 0
4885 PURBA BARDHAMAN Katwa - II Central Mechanical MAKHALTOR PIPED WATER SUPPLY SCHEME , SM/15153 New New service connection charges of Makhaltor W/S Scheme TW-1 BILL/00687/2023-2024 BP-2023-24-35 26/06/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.30 0.00 0 0
4886 PURBA BARDHAMAN Katwa - II Central Mechanical MAKHALTOR PIPED WATER SUPPLY SCHEME , SM/15153 New New service connection charges for Makhaltor W/S Scheme TW-2 BILL/00697/2023-2024 BP-2023-24-38 27/06/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 9.11 0.00 0 0
4887 PURBA BARDHAMAN Katwa - II Central Mechanical MAKHALTOR PIPED WATER SUPPLY SCHEME , SM/15153 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Mulgram & others water supply scheme under Katwa-II Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. ASSISTANT ENGINEER Junior Engineer ORD/000070/2024-2025 2409/CMD 02/08/2024 90 DUTTA ENTERPRISE 50.18 0.00 0 0
4888 PURBA BARDHAMAN Katwa - II Burdwan Division MAKHALTOR PIPED WATER SUPPLY SCHEME , SM/15153 New MAKHALTOR Piped Water Supply Scheme with sinking of Tube-well, LDS, Rising Main, FHTC & construction of switch rooms & boundary walls with gates and land development, drain and internal pathway at different TW site under Katwa-II Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer JUNIOR ENGINEER KATWA SUB-DIVISION PHE DTE ORD/000733/2022-2023 1050/BWD 10/03/2023 663 HAMID SK 195.79 118.40 60.47 99
4889 PURBA BARDHAMAN Katwa - II Central Mechanical MAKHALTOR PIPED WATER SUPPLY SCHEME , SM/15153 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at MAKHALTOR Water Supply Scheme [ Block- KATWA-2] under CMD, PHE Dte., Dist.- Purba-Bardhaman. Driller In-Charge Junior Engineer ORD/000108/2023-2024 2612/CMD 08/06/2023 280 SOUNAK ENTERPRISE 27.65 21.16 76.53 30
4890 PURBA BARDHAMAN Katwa - II Burdwan Division MAKHALTOR PIPED WATER SUPPLY SCHEME , SM/15153 New Providing left out FHTC at different area under the command area of Makhaltore PWSS (SM/15153) in order to declare Sajal Gram and other anciallary works, Katwa II Block under Katwa Sub Division, PHE. Dte. Assistant Engineer ORD/001310/2024-2025 1085/BWD 28/03/2025 30 HAMID SK 7.42 0.00 0 0
4891 PURBA BARDHAMAN Mangolkote Burdwan Division SITAHATI PIPE WATER SUPPLY SCHEME , SM/15161 New Material Requisition To Resource Division RTOR000041/2023-2024 1962/BWD 25/04/2023 Resource Division 1.10 0.00 0 0
4892 PURBA BARDHAMAN Mangolkote Burdwan Division SITAHATI PIPE WATER SUPPLY SCHEME , SM/15161 New Material Requisition To Resource Division RTOR000324/2023-2024 2197/BWD 12/05/2023 Resource Division 17.24 0.00 0 0
4893 PURBA BARDHAMAN Mangolkote Burdwan Division SITAHATI PIPE WATER SUPPLY SCHEME , SM/15161 New Material Requisition To Resource Division RTOR000734/2023-2024 5233/BWD 30/11/2023 Resource Division 20.37 0.00 0 0
4894 PURBA BARDHAMAN Mangolkote Central Mechanical SITAHATI PIPE WATER SUPPLY SCHEME , SM/15161 New NEW SERVICE CONNECTION FOR SITAHATI PWSS. BILL/02863/2023-2024 BP-2023-24-611 06/03/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 6.68 0.00 0 0
4895 PURBA BARDHAMAN Mangolkote Central Mechanical SITAHATI PIPE WATER SUPPLY SCHEME , SM/15161 New NEW SERVICE CONNECTION FOR SITAHATI PWSS. BILL/02861/2023-2024 BP-2023-24-612 06/03/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 8.43 0.00 0 0
4896 PURBA BARDHAMAN Mangolkote Burdwan Division SITAHATI PIPE WATER SUPPLY SCHEME , SM/15161 New Supply, delivery, installation & hand hold demonstration of different equipments / machineries to test HDPE pipes as per IS: 4984-2016 at the pipe testing laboratory at Nababhat under Burdwan Division, PHE. Dte._2ND CALL AE(HQs) J.E. 1 BURDWAN ORD/001212/2023-2024 907/BWD 04/03/2024 30 MANASH GHOSH 23.87 0.00 0 100
4897 PURBA BARDHAMAN Mangolkote Central Mechanical SITAHATI PIPE WATER SUPPLY SCHEME , SM/15161 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at SITAHATI Water Supply Scheme [ Block- MANGOLKOTE] under CMD, PHE Dte., Dist.- Purba-Bardhaman. Driller In-Charge Junior Engineer ORD/000875/2023-2024 4138/CMD 29/08/2023 30 CHOUDHURY ENTERPRISE 27.70 1.15 4.15 46
4898 PURBA BARDHAMAN Mangolkote Burdwan Division SITAHATI PIPE WATER SUPPLY SCHEME , SM/15161 New Material Requisition To Resource Division RTOR000009/2024-2025 4118/BWD 25/11/2024 Resource Division 18.62 0.00 0 0
4899 PURBA BARDHAMAN Mangolkote Central Mechanical SITAHATI PIPE WATER SUPPLY SCHEME , SM/15161 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Lakshimpur & others water supply scheme under Mangalkote Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman Driller In-Charge Junior Engineer ORD/000097/2024-2025 2406/CMD 02/08/2024 290 CHOUDHURY ENTERPRISE 57.65 0.00 0 10
4900 PURBA BARDHAMAN Mangolkote Burdwan Division SITAHATI PIPE WATER SUPPLY SCHEME , SM/15161 New Different works related (sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of different capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site) to PALISGRAM, PURBA NAYAPARA & SITAHATI Piped Water Supply Scheme under MONGALKOTE Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer JUNIOR ENGINEER KATWA SUB-DIVISION PHE DTE,JUNIOR ENGINEER R.W.S. BURDWAN SUB-DIVISION PHE DTE ORD/000695/2023-2024 4364/BWD 04/10/2023 668 M/S S. CHOUDHURY 1,505.07 0.00 0 77
4901 PURBA BARDHAMAN Mangolkote Burdwan Division SITAHATI PIPE WATER SUPPLY SCHEME , SM/15161 New Different types of works involve in connection with implementation of Aug. Mongalkote, Palishgram, Purba Nowapara, Sitahati, Singhi, Mejhiary & Karui Piped Water Supply Scheme within Katwa Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer ORD/001191/2024-2025 873/BWD 06/03/2025 180 M/S S. CHOUDHURY 588.22 0.00 0 0
4902 PURBA BARDHAMAN Ketugram - I Burdwan Division CHATKA PIPED WATER SUPPLY SCHEME , SM/15168 New Material Requisition To Resource Division RTOR000304/2023-2024 2197/BWD 12/05/2023 Resource Division 2.18 0.00 0 0
4903 PURBA BARDHAMAN Ketugram - I Burdwan Division CHATKA PIPED WATER SUPPLY SCHEME , SM/15168 New Material Requisition To Resource Division RTOR000430/2023-2024 3856/BWD 01/09/2023 Resource Division 0.69 0.00 0 0
4904 PURBA BARDHAMAN Ketugram - I Burdwan Division CHATKA PIPED WATER SUPPLY SCHEME , SM/15168 New Material Requisition To Resource Division RTOR000738/2023-2024 5232/BWD 30/11/2023 Resource Division 20.18 0.00 0 0
4905 PURBA BARDHAMAN Ketugram - I Central Drilling CHATKA PIPED WATER SUPPLY SCHEME , SM/15168 New Providing drilling crew and other allied works for construction of Tube Well (250mm X200mm X 114 Mtrs. Depth) by utilising Departmental Machineries for Chatka W/S Scheme (T/W-I & II), Ketugram-I Block under Purba Bardhman District, Central Drilling Division, P.H.E. Dte. Driller In Charge Junior Engineer ORD/000174/2023-2024 1344/CDD 13/09/2023 30 OSMAN SEKH 16.61 0.00 0 0
4906 PURBA BARDHAMAN Ketugram - I Central Mechanical CHATKA PIPED WATER SUPPLY SCHEME , SM/15168 New New service connection charges for Chatka PWSS TW-2 BILL/01768/2023-2024 BP-2023-24-277 21/12/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.06 0.00 0 0
4907 PURBA BARDHAMAN Ketugram - I Central Mechanical CHATKA PIPED WATER SUPPLY SCHEME , SM/15168 New New service connection charges for Chatka PWSS TW-1 BILL/01767/2023-2024 BP-2023-24-276 21/12/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 5.85 0.00 0 0
4908 PURBA BARDHAMAN Ketugram - I Central Mechanical CHATKA PIPED WATER SUPPLY SCHEME , SM/15168 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Rajur & others water supply scheme under Ketugram-I Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. Driller In-Charge Junior Engineer ORD/000098/2024-2025 2407/CMD 02/08/2024 90 M.S. ENTERPRISE 82.29 0.00 0 0
4909 PURBA BARDHAMAN Ketugram - I Burdwan Division CHATKA PIPED WATER SUPPLY SCHEME , SM/15168 New Balance work for OHR, extension of pipeline to provide FHTC with sinking of tube well, construction of pump house, boundary wall, land development, plinth protection for pump house, approach road & other related work under Chakta, Mahula, Rajoor and Srigram PWSS under Katwa Sub Division, Block- Ketugram-I, Burdwan Division PHE Dte. Assistant Engineer JUNIOR ENGINEER R.W.S. BURDWAN SUB-DIVISION PHE DTE ORD/000284/2024-2025 2721/BWD 11/07/2024 120 ESCON INDIA 139.35 0.00 0 70
4910 PURBA BARDHAMAN Ketugram - I Burdwan Division CHATKA PIPED WATER SUPPLY SCHEME , SM/15168 New Material Requisition To Resource Division RTOR000029/2024-2025 309/BWD 15/01/2025 Resource Division 12.09 0.00 0 0
4911 PURBA BARDHAMAN Ketugram - I Central Mechanical CHATKA PIPED WATER SUPPLY SCHEME , SM/15168 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at CHATKA Water Supply Scheme [ Block- KETUGRAM-1] under CMD, PHE Dte., Dist.- Purba-Bardhaman. Driller In-Charge Junior Engineer ORD/000867/2023-2024 4117/CMD 29/08/2023 740 SOUNAK ENTERPRISE 28.48 0.00 0 90
4912 PURBA BARDHAMAN Ketugram - I Burdwan Division CHATKA PIPED WATER SUPPLY SCHEME , SM/15168 New CHATKA Piped Water Supply Scheme with sinking of Tube-well, LDS, Rising Main, FHTC, Construction of 300 cum capacity RCC OHR with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drain and internal pathway at different TW site under KETUGRAM-I Block, District:- Purba-Bardhaman [NEW SCHEME]_2ND CALL Assistant Engineer JUNIOR ENGINEER R.W.S. BURDWAN SUB-DIVISION PHE DTE ORD/000352/2023-2024 3065/BWD 17/07/2023 534 M/S H.R. CONSTRUCTION 402.79 86.34 21.44 86
4913 PURBA BARDHAMAN Burdwan Division AUGUMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR CHANDUTIA , SM/15205 Augmentation Preparation and Submission of DPR for Augmentation of Chandutia PWSS under Burdwan-I Development Block under Burdwan Division, P.H.E Dte.[2nd Call] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000348/2023-2024 1475/BSD 12/07/2023 15 MEASURE LAND 0.78 0.77 98.72 100
4914 PURBA BARDHAMAN Burdwan Division AUGUMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR CHANDUTIA , SM/15205 Augmentation Providing 22 Nos.FHTC at CHANDUTIA & JAMALPUR village for declearation of SWAJALGRAM under CHANDUTIA Piped Water Supply Scheme, Block- Burdwan-I within Burdwan Sub Division under Burdwan Division PHE Dte. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000147/2024-2025 1033/BSD 10/06/2024 108 MANABSEBA PROKALPA & CONSTRUCTIONS 0.97 0.00 0 100
4915 PURBA BARDHAMAN Central Mechanical AUGMENTATION OF BERWA PIPED WATER SUPPLY SCHEME , SM/15568 Augmentation NEW SERVICE CONNECTION FOR AUGMENTATION OF BERWA PIPED WATER SUPPLY SCHEME. BILL/02827/2023-2024 BP-2023-24-594 04/03/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 7.25 0.00 0 0
4916 PURBA BARDHAMAN Central Mechanical AUGMENTATION OF BERWA PIPED WATER SUPPLY SCHEME , SM/15568 Augmentation Illumination arrangement & different electro-mechanical works at BARWA water supply scheme under Memari-I Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. ASSISTANT ENGINEER Junior Engineer ORD/000443/2024-2025 2796/CMD 01/10/2024 60 A.K. ENTERPRISE 11.65 0.00 0 0
4917 PURBA BARDHAMAN Central Mechanical AUGMENTATION OF BERWA PIPED WATER SUPPLY SCHEME , SM/15568 Augmentation Withdrawing damaged p/m set from defunct tube well and Supply & Installation of submersible pumping machinery for T.W. No.-I (Replacement tube well) and different electro-mechanical works for P.H No.-I & II at BARWA w/s scheme under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER Junior Engineer ORD/000460/2024-2025 1147/CMSD 02/09/2024 30 MITRA ENTERPRISE 4.16 0.00 0 100
4918 PURBA BARDHAMAN Central Mechanical AUGMENTATION OF BERWA PIPED WATER SUPPLY SCHEME , SM/15568 Augmentation Supply & Installation of Submersible Pumping Machinery , Voltage Stabilizer, Chlorination system and internal House wiring for Tube well no.- 1&2 at Augumentation of Berawa Water Supply Scheme under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER Junior Engineer ORD/000101/2023-2024 2600/CMD 07/06/2023 755 SOUNAK ENTERPRISE 22.60 0.00 0 50
4919 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF BERWA PIPED WATER SUPPLY SCHEME , SM/15568 Augmentation Different Types of work involved in connection with different Augmentation & Retrofitting Schemes (06 Nos.) Piped Water Supply Scheme under Memari II Block within Burdwan Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/001269/2024-2025 848/BWD 05/03/2025 120 PROJECT INDIA 394.29 0.00 0 0
4920 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF BERWA PIPED WATER SUPPLY SCHEME , SM/15568 Augmentation Augmentation of BERWA Piped Water Supply Scheme with sinking of Tube-well, LDS, Rising Main, FHTC, Construction of 150 cum capacity RCC OHR with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drain and internal pathway at different TW site under Memari-II Block, District:- Purba-Bardhaman. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER RWS BURDWAN SUB-DIVISION PHE DTE ORD/000587/2023-2024 3743/BWD 28/08/2023 731 ROY ENTERPRISE 334.82 37.43 11.18 65
4921 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF BERWA PIPED WATER SUPPLY SCHEME , SM/15568 Augmentation Replacement of Tube-well & Rising main at Head work TW site for BARWA Piped Water Supply Scheme under MEMARI-II Block, District:- Purba-Bardhaman. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER RWS BURDWAN SUB-DIVISION PHE DTE ORD/000226/2024-2025 2523/BWD 03/07/2024 90 ROY ENTERPRISE 15.27 0.00 0 80
4922 PURBA BARDHAMAN Central Mechanical AUGMENTATION OF SATGACHIA ZONE-II (PART-B) , SM/15182 Augmentation Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination system and internal House wiring for Tube well no.- 1 & 2 at Augmentation of SATGACHIA(Z-II, Part-B)[MEMARI-II] Water Supply Scheme under CMD, PHE Dte., Dist.- Purba-Bardhaman. ORD/001075/2023-2024 4199/CMD 29/08/2023 30 DAS TRADING CO. 24.41 0.00 0 0
4923 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF SATGACHIA ZONE-II (PART-B) , SM/15182 Augmentation Sinking of Tube-well, construction of switch rooms & Rising main at 3RD TW site for SATGACHIA ZONE-II Piped Water Supply Scheme under MEMARI-II Block, District:- Purba-Bardhaman. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000899/2023-2024 5357/BWD 06/12/2023 60 J K CORPORATION 20.10 0.00 0 0
4924 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF SATGACHIA ZONE-II (PART-B) , SM/15182 Augmentation Construction of boundary wall and Land development with approach road including internal drain at 2ND TW site for SATGACHIA ZONE-II PWSS under Memari-II Block, District:- Purba-Bardhaman. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000948/2023-2024 5595/BWD 20/12/2023 30 GOUTAM KUMAR MITRA 5.09 0.00 0 100
4925 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF SATGACHIA ZONE-II (PART-B) , SM/15182 Augmentation Restoration of Pump House at Head Work site of SATGACHIA ZONE-II Piped water supply scheme at Memari-II Block under Burdwan Division, Dist.-Purba Bardhaman. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000137/2024-2025 1002/BSD 06/06/2024 30 SAANVI ENTERPRISE 0.96 0.00 0 10
4926 PURBA BARDHAMAN Central Mechanical AUGMENTATION OF SATGACHIA ZONE-II (PART-B) , SM/15182 Augmentation Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Zone- I & II, Tube well No.- I (Replacement tube well) at Satgachia Water Supply Scheme [ BLOCK- Memari-2] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER Junior Engineer ORD/000531/2024-2025 3071/CMD 03/12/2024 60 NABAUDYOG ELECTRICAL ENGINEERING CO-OPERATIVE SOCIETY LTD 25.34 0.00 0 95
4927 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF SATGACHIA ZONE-II (PART-B) , SM/15182 Augmentation Different Types of work involved in connection with different Augmentation & Retrofitting Schemes (06 Nos.) Piped Water Supply Scheme under Memari II Block within Burdwan Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/001269/2024-2025 848/BWD 05/03/2025 120 PROJECT INDIA 394.29 0.00 0 0
4928 PURBA BARDHAMAN Raina - I Burdwan Division RASUIKHANDA PIPED WATER SUPPLY SCHEME , SM/16253 New Material Requisition To Resource Division RTOR000184/2023-2024 2155/BWD 10/05/2023 Resource Division 7.15 0.00 0 0
4929 PURBA BARDHAMAN Raina - I Central Mechanical RASUIKHANDA PIPED WATER SUPPLY SCHEME , SM/16253 New New service connection charges for Rasuikhanda PWSS TW 1 BILL/01371/2023-2024 BP-2023-24-139 25/08/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 10.04 0.00 0 0
4930 PURBA BARDHAMAN Raina - I Burdwan Division RASUIKHANDA PIPED WATER SUPPLY SCHEME , SM/16253 New Material Requisition To Resource Division RTOR000484/2023-2024 4008/BWD 08/09/2023 Resource Division 2.23 0.00 0 0
4931 PURBA BARDHAMAN Raina - I Central Mechanical RASUIKHANDA PIPED WATER SUPPLY SCHEME , SM/16253 New New service connection charges for Rasuikhanda PWSS TW-2 BILL/01426/2023-2024 BP-2023-24-153 05/09/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 8.70 0.00 0 0
4932 PURBA BARDHAMAN Raina - I Burdwan Division RASUIKHANDA PIPED WATER SUPPLY SCHEME , SM/16253 New Material Requisition To Resource Division RTOR000688/2023-2024 5065/BWD 23/11/2023 Resource Division 20.46 0.00 0 0
4933 PURBA BARDHAMAN Raina - I Burdwan Division RASUIKHANDA PIPED WATER SUPPLY SCHEME , SM/16253 New Continuation order for "Supply of one No. Diesel Driven Ambassador Car on hire basis for the office of the Assistant Engineer, Burdwan Sub-Division, PHE Dte for the period of 01.12.2023 to 31.05.2024 Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/001007/2023-2024 2751/BSD 28/11/2023 183 SK.ASFIA 2.40 0.00 0 70
4934 PURBA BARDHAMAN Raina - I Central Mechanical RASUIKHANDA PIPED WATER SUPPLY SCHEME , SM/16253 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Bajitpur, Belsar & other water supply scheme under Raina-1 Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000117/2024-2025 2589/CMD 27/08/2024 90 DEY ENTERPRISE 74.58 0.00 0 0
4935 PURBA BARDHAMAN Raina - I Burdwan Division RASUIKHANDA PIPED WATER SUPPLY SCHEME , SM/16253 New Different works related (sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of different capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site) to GOPALPUR & RASUIKHANDA Piped Water Supply Scheme under Raina-I Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000006/2023-2024 1691/BWD 12/04/2023 629 SK ALIM 1,081.52 368.20 34.04 92
4936 PURBA BARDHAMAN Raina - I Burdwan Division RASUIKHANDA PIPED WATER SUPPLY SCHEME , SM/16253 New Material Requisition To Resource Division RTOR000082/2024-2025 408/BWD 17/01/2025 Resource Division 7.35 0.00 0 0
4937 PURBA BARDHAMAN Raina - I Burdwan Division RASUIKHANDA PIPED WATER SUPPLY SCHEME , SM/16253 New Balance work [i.e. Extension or parallel Pipeline, Leftout FHTC, Road Restoration work, Sinking of Additional Tube Well with Pump House & Boundary wall, inter Connection of Additional Tube Well, Construction of M.S.Structural bridge, canal Crossing, MS casing with allied work of Bhagabatipur, Machkhara, Udgara, Bantir, Chakpurohit Rasuikhanda, Sankarpur, Gopalpur & Belshar PWSS Block-RAINA- I under Burdwan Sub Division, PHE Dte. within Burdwan Division PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/001103/2024-2025 469/BWD 24/01/2025 180 SK ALIM 1,353.91 0.00 0 0
4938 PURBA BARDHAMAN Raina - I Central Mechanical RASUIKHANDA PIPED WATER SUPPLY SCHEME , SM/16253 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at Rasuikhanda Water Supply Scheme [ Block- Raina-1 ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000184/2023-2024 2968/CMD 17/07/2023 351 ORIENTAL ENGINEERING CO. 28.96 0.00 0 90
4939 PURBA BARDHAMAN Central Mechanical AUGMENTATION OF KSHETPUR PALASHI PIPED WATER SUPPLY SCHEME , SM/16016 Augmentation New service connection charges for Kshetpur Palashi PWSS TW-1 BILL/01764/2023-2024 BP-2023-24-280 21/12/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 4.00 0.00 0 0
4940 PURBA BARDHAMAN Central Mechanical AUGMENTATION OF KSHETPUR PALASHI PIPED WATER SUPPLY SCHEME , SM/16016 Augmentation Supply & Installation of Submersible Pumping Machinery , Voltage Stabilizer, Chlorination system and internal House wiring for Tube well no.- 1&2 at Augumentation of Kshetpur Plasi Water Supply Scheme under CMD, PHE Dte., Dist.- Purba-Bardhaman. Driller In-Charge Junior Engineer ORD/000094/2023-2024 2585/CMD 07/06/2023 820 SOUNAK ENTERPRISE 22.60 0.00 0 48
4941 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF KSHETPUR PALASHI PIPED WATER SUPPLY SCHEME , SM/16016 Augmentation Augmentation of KSHETPUR PALASHI Piped Water Supply Scheme with sinking of Tube-well, LDS, Rising Main, FHTC & Renovation of switch-rooms & boundary walls at different TW site under Katwa-II Block, District:- Purba-Bardhaman. Assistant Engineer JUNIOR ENGINEER KATWA SUB-DIVISION PHE DTE ORD/000117/2023-2024 2303/BWD 19/05/2023 448 SHUBHRA KANTI GHOSH 121.71 46.04 37.83 95
4942 PURBA BARDHAMAN Central Mechanical AUGMENTATION OF EKAIHAT PIPED WATER SUPPLY SCHEME , SM/16017 Augmentation Supply & Installation of Submersible Pumping Machinery , Voltage Stabilizer, Chlorination system and internal House wiring for Tube well no.- 1&2 at Augumentation of Ekaihat Water Supply Scheme under CMD, PHE Dte., Dist.- Purba-Bardhaman. Driller In-Charge Junior Engineer ORD/000090/2023-2024 2583/CMD 07/06/2023 30 M/S. S.R. ENTERPRISE 22.38 0.00 0 0
4943 PURBA BARDHAMAN Central Mechanical AUGMENTATION OF EKAIHAT PIPED WATER SUPPLY SCHEME , SM/16017 Augmentation QUOTATION FOR AUGMENTATION OF EKAIHAT PWSS TW-4 BILL/00664/2024-2025 BP-2024-25-266 20/08/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 7.65 0.00 0 0
4944 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF EKAIHAT PIPED WATER SUPPLY SCHEME , SM/16017 Augmentation Augmentation of EKAIHAT Piped Water Supply Scheme with sinking of Tube-well, LDS, Rising Main, FHTC & Construction of switch rooms & boundary walls with gates and land development, drain and internal pathway at different TW site under KATWA-I Block, District:- Purba-Bardhaman. Assistant Engineer Junior Engineer, R.W.S., Katwa-I Dev. Block ORD/000174/2023-2024 3031/BWD 14/07/2023 627 HAMID SK 130.08 12.45 9.57 90
4945 PURBA BARDHAMAN Central Mechanical AUGMENTATION OF SAHAPUR PIPED WATER SUPPLY SCHEME , SM/16022 Augmentation New service connection charges for Sahapur PWSS TW-1 BILL/01521/2023-2024 BP-2023-24-187 09/10/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.16 0.00 0 0
4946 PURBA BARDHAMAN Central Mechanical AUGMENTATION OF SAHAPUR PIPED WATER SUPPLY SCHEME , SM/16022 Augmentation Supply & Installation of Submersible Pumping Machinery , Voltage Stabilizer, Chlorination system and internal House wiring for Tube well no.- 1&2 at Augumentation of Sahapur Water Supply Scheme under CMD, PHE Dte., Dist.- Purba-Bardhaman. Driller In-Charge Junior Engineer ORD/000096/2023-2024 2586/CMD 07/06/2023 30 M/S, S.S. ENTERPRISE. 22.60 0.00 0 46
4947 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF SAHAPUR PIPED WATER SUPPLY SCHEME , SM/16022 Augmentation Augmentation of SAHAPUR Piped Water Supply Scheme with sinking of Tube-well, LDS, Rising Main, FHTC & renovation of switch-rooms & boundary walls at different TW site under Katwa-II Block, District:- Purba-Bardhaman. Assistant Engineer JUNIOR ENGINEER KATWA SUB-DIVISION PHE DTE ORD/000132/2023-2024 2343/BWD 22/05/2023 120 KHEPIMA ENGINEERS CO. OPERATIVE SOCIETY LTD. 137.76 58.91 42.76 95
4948 PURBA BARDHAMAN Purbasthali - I Burdwan Division SHANKRA PIPE WATER SUPPLY SCHEME , SM/16032 New Material Requisition To Resource Division RTOR000305/2023-2024 2197/BWD 12/05/2023 Resource Division 8.59 0.00 0 0
4949 PURBA BARDHAMAN Purbasthali - I Burdwan Division SHANKRA PIPE WATER SUPPLY SCHEME , SM/16032 New Material Requisition To Resource Division RTOR000546/2023-2024 4311/BWD 29/09/2023 Resource Division 8.44 0.00 0 0
4950 PURBA BARDHAMAN Purbasthali - I Central Mechanical SHANKRA PIPE WATER SUPPLY SCHEME , SM/16032 New Supply & Installation of Submersible Pumping Machinery , Voltage Stabilizer, Chlorination system and internal House wiring for Tube well no.- 1 & 2 at SHANKRA [PURBASTHALI-I] Water Supply Scheme under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000887/2023-2024 4150/CMD 29/08/2023 30 M/S, S.S. ENTERPRISE. 21.22 0.00 0 0
4951 PURBA BARDHAMAN Purbasthali - I Burdwan Division SHANKRA PIPE WATER SUPPLY SCHEME , SM/16032 New Material Requisition To Resource Division RTOR000590/2023-2024 4898/BWD 10/11/2023 Resource Division 13.06 0.00 0 0
4952 PURBA BARDHAMAN Purbasthali - I Burdwan Division SHANKRA PIPE WATER SUPPLY SCHEME , SM/16032 New Work order for "Service for land acquisition for different PWSS under JJM of Purbasthali-I block under Kalna Sub-Division, PHE Dte." Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000962/2023-2024 1721/KSD 05/12/2023 90 PARTHA PRATIM ACHARYA 0.96 0.00 0 5
4953 PURBA BARDHAMAN Purbasthali - I Burdwan Division SHANKRA PIPE WATER SUPPLY SCHEME , SM/16032 New Different works related (sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of different capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site) to SHYAMPUR, GAHAK & SHANKRA Piped Water Supply Scheme under Purbasthali I Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000639/2023-2024 3957/BWD 07/09/2023 365 M/S B. NANDI 758.52 0.00 0 20
4954 PURBA BARDHAMAN Purbasthali - I Central Mechanical SHANKRA PIPE WATER SUPPLY SCHEME , SM/16032 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Manganpur & others water supply scheme under Purbasthali 1 Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000714/2024-2025 2979/CMD 25/11/2024 90 H.K. DAS & CO. 53.27 0.00 0 0
4955 PURBA BARDHAMAN Burdwan Division AUGUMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR SHAKTIGARH , SM/16479 Augmentation Continuation Work for the supply of one no. Diesel driven Motor Cab/Maxi Cab (Air Conditioner) on hire basis for the office of the Assistant Engineer, to be used by the Assistant Engineer, RWS Burdwan Sub-Divn., PHE. Dte. (Period from 01/01/2024 to 29/02/2024) Junior Engineer, R.W.S. Burdwan Sub Division, P.H.E. Dt ORD/001221/2023-2024 403/RWS 29/12/2023 60 MD HASIN 0.80 0.00 0 0
4956 PURBA BARDHAMAN Burdwan Division AUGUMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR SHAKTIGARH , SM/16479 Augmentation Crossing of Old G.T Road near Head Works with 250 mm dia pipeline through pushing of 750mm.dia RCC casing pipe by hydraulic jacking method for Saktigarh W/S Scheme (Augmentation) under Burdwan Division, PHE Dte. Junior Engineer, R.W.S. Burdwan Sub Division, P.H.E. Dt ORD/000083/2024-2025 153/RWS 29/04/2024 25 IJABUL SEKH 6.55 0.00 0 100
4957 PURBA BARDHAMAN Central Mechanical AUGUMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR SHAKTIGARH , SM/16479 Augmentation Quotation for new service connection at Augmentation of Shaktigarh W/S Scheme TW-3. BILL/00372/2024-2025 BP-2024-25-184 08/07/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 4.01 0.00 0 0
4958 PURBA BARDHAMAN Central Mechanical AUGUMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR SHAKTIGARH , SM/16479 Augmentation Quotation for new service connection for Shaktigarh PWSS PH-2 BILL/00294/2024-2025 BP-2024-25-183 08/07/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.48 0.00 0 0
4959 PURBA BARDHAMAN Burdwan Division AUGUMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR SHAKTIGARH , SM/16479 Augmentation Protection work of LDS and approach road to 2nd Pump-House of Saktigarh PWSS Augmentation at the node point of 161-166 under Burdwan Division, PHE Dte. [SM-16479] Junior Engineer, R.W.S. Burdwan Sub Division, P.H.E. Dt ORD/001170/2023-2024 94/RWS 13/03/2024 20 JAYANTA CHAKRABORTY 0.95 0.00 0 100
4960 PURBA BARDHAMAN Burdwan Division AUGUMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR SHAKTIGARH , SM/16479 Augmentation Protection of LDS of Saktigarh PWSS Augmentation at the node point of 36-44-64 under Burdwan Division, PHE Dte. [SM-16479] Junior Engineer, R.W.S. Burdwan Sub Division, P.H.E. Dt ORD/001168/2023-2024 92/RWS 13/03/2024 20 KHUSI BHAKAT 0.78 0.00 0 100
4961 PURBA BARDHAMAN Central Mechanical AUGUMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR SHAKTIGARH , SM/16479 Augmentation Additional quotation for conversion of HTOH line from HT at Saktigarh (Aug) PWSS. BILL/00442/2024-2025 BP-2024-25-231 30/07/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 9.08 0.00 0 0
4962 PURBA BARDHAMAN Burdwan Division AUGUMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR SHAKTIGARH , SM/16479 Augmentation Protection of LDS of Saktigarh PWSS Augmentation at the node point of 75-123 under Burdwan Division, PHE Dte. [SM-16479] Junior Engineer, R.W.S. Burdwan Sub Division, P.H.E. Dt ORD/001169/2023-2024 93/RWS 13/03/2024 20 GHOSH ENTERPRISE 0.79 0.00 0 100
4963 PURBA BARDHAMAN Burdwan Division AUGUMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR SHAKTIGARH , SM/16479 Augmentation Augmentation of SAKTIGARH Piped Water Supply Scheme with sinking of Tube-well, LDS, Rising Main, FHTC & Construction of switch rooms & boundary walls with gates and land development, drain and internal pathway at different TW site under BARDHAMAN-II Block, District:- Purba-Bardhaman. ASSISTANT ENGINEER R.W.S. BURDWAN SUB-DIVISION PHE DTE Junior Engineer, R.W.S. Burdwan Sub Division, P.H.E. Dt ORD/000896/2023-2024 5376/BWD 07/12/2023 180 IJABUL SEKH 203.46 0.00 0 50
4964 PURBA BARDHAMAN Burdwan Division AUGUMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR SHAKTIGARH , SM/16479 Augmentation Continuation for the work of Supply of one No. Diesel Driven Car ( other than Ambasader) on hire basis for the office of the Assistant Engineer, RWS Burdwan Sub-Division, PHE Dte. (Period from 01-09-2024 to 31-10-2024). Contractual Junior Engineer ORD/000561/2024-2025 274/RWS 30/08/2024 60 MD HASIN 0.80 0.00 0 0
4965 PURBA BARDHAMAN Burdwan Division AUGUMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR SHAKTIGARH , SM/16479 Augmentation Continuation for the work of Supply of one No. Diesel Driven Car (other than Ambasader) on hire basis for the office of the Assistant Engineer, RWS Burdwan Sub-Division, PHE Dte. (Period from 01-11-2024 to 31-12-2024). ASSISTANT ENGINEER R.W.S. BURDWAN SUB-DIVISION PHE DTE Contractual Junior Engineer ORD/000763/2024-2025 352/RWS 30/10/2024 60 MD HASIN 0.80 0.00 0 0
4966 PURBA BARDHAMAN Central Mechanical AUGUMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR SHAKTIGARH , SM/16479 Augmentation Illumination arrangement & different electro-mechanical works at SAKTIGARH water supply scheme under Bardhaman-II Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman ASSISTANT ENGINEER Junior Engineer ORD/000479/2024-2025 2956/CMD 20/11/2024 60 CHOUDHURY ENTERPRISE 14.34 0.00 0 0
4967 PURBA BARDHAMAN Burdwan Division AUGUMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR SHAKTIGARH , SM/16479 Augmentation Supply of one No. Diesel Driven Car ( other than Ambasader) on hire basis for the office of the Assistant Engineer, RWS Burdwan Sub-Division, PHE Dte. (Period from 01-07-2024 to 31-08-2024). Contractual Junior Engineer ORD/000364/2024-2025 207/RWS 28/06/2024 60 MD HASIN 0.80 0.57 71.25 0
4968 PURBA BARDHAMAN Burdwan Division AUGUMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR SHAKTIGARH , SM/16479 Augmentation Continuation for the work of Supply of one No. Diesel Driven Car (other than Ambasader) on hire basis for the office of the Assistant Engineer, RWS Burdwan Sub-Division, PHE Dte. (Period from 01-01-2025 to 28-02-2025). ASSISTANT ENGINEER R.W.S. BURDWAN SUB-DIVISION PHE DTE Contractual Junior Engineer ORD/000995/2024-2025 413/RWS 31/12/2024 60 MD HASIN 0.79 0.00 0 0
4969 PURBA BARDHAMAN Central Mechanical AUGUMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR SHAKTIGARH , SM/16479 Augmentation Supply & Installation of Submersible Pumping Machinery , Voltage Stabilizer, Chlorination system and internal House wiring for Tube well no.- 1&2 at Augumentation of Saktigrah Water Supply Scheme under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER Junior Engineer ORD/000098/2023-2024 2587/CMD 07/06/2023 755 P.K. ENGINEERING 22.69 0.00 0 95
4970 PURBA BARDHAMAN Ketugram - II Burdwan Division JHAMATPUR PIPED WATER SUPPLY SCHEME , SM/16256 New Material Requisition To Resource Division RTOR000059/2023-2024 1962/BWD 25/04/2023 Resource Division 1.42 0.00 0 0
4971 PURBA BARDHAMAN Ketugram - II Burdwan Division JHAMATPUR PIPED WATER SUPPLY SCHEME , SM/16256 New Material Requisition To Resource Division RTOR000293/2023-2024 2197/BWD 12/05/2023 Resource Division 2.35 0.00 0 0
4972 PURBA BARDHAMAN Ketugram - II Central Mechanical JHAMATPUR PIPED WATER SUPPLY SCHEME , SM/16256 New New service connection charges for Jhamatpur PWSS Tw-1 BILL/00761/2023-2024 BP-2023-24-63 18/07/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.30 0.00 0 0
4973 PURBA BARDHAMAN Ketugram - II Burdwan Division JHAMATPUR PIPED WATER SUPPLY SCHEME , SM/16256 New Material Requisition To Resource Division RTOR000594/2023-2024 4902/BWD 10/11/2023 Resource Division 10.00 0.00 0 0
4974 PURBA BARDHAMAN Ketugram - II Central Mechanical JHAMATPUR PIPED WATER SUPPLY SCHEME , SM/16256 New New service connection charges for Jhamatpur PWSS TW-2 BILL/01899/2023-2024 BP-2023-24-369 15/01/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.30 0.00 0 0
4975 PURBA BARDHAMAN Ketugram - II Central Mechanical JHAMATPUR PIPED WATER SUPPLY SCHEME , SM/16256 New Supplimentary Quotation for ROW at Jhamatpur PWSS TW-2. BILL/00254/2024-2025 BP-2024-25-132 05/06/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 0.71 0.00 0 0
4976 PURBA BARDHAMAN Ketugram - II Central Mechanical JHAMATPUR PIPED WATER SUPPLY SCHEME , SM/16256 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Kankurhati & others water supply scheme under Ketugram-2 Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. Driller In-Charge Junior Engineer ORD/000103/2024-2025 2408/CMD 02/08/2024 90 DIPALI CONSTRUCTION 41.95 0.00 0 0
4977 PURBA BARDHAMAN Ketugram - II Central Mechanical JHAMATPUR PIPED WATER SUPPLY SCHEME , SM/16256 New Supply & Installation of Submersible Pumping Machinery , Voltage Stabilizer, Chlorination system and internal House wiring for Tube well no.- 1 & 2 at JHAMATPUR Water Supply Scheme [Block - KETUGRAM-2] under CMD, PHE Dte., Dist.- Purba-Bardhaman. Driller In-Charge Junior Engineer ORD/000161/2023-2024 2887/CMD 10/07/2023 730 A.S. ENTERPRISE 20.76 4.60 22.16 40
4978 PURBA BARDHAMAN Ketugram - II Burdwan Division JHAMATPUR PIPED WATER SUPPLY SCHEME , SM/16256 New JHAMATPUR Piped Water Supply Scheme with sinking of Tube-well, LDS, Rising Main, FHTC, Construction of 100 cum capacity RCC OHR with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drain and internal pathway at different TW site under KETUGRAM-II Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer JUNIOR ENGINEER R.W.S. BURDWAN SUB-DIVISION PHE DTE ORD/000134/2023-2024 2384/BWD 23/05/2023 300 M/S M.M. ENTERPRISE 228.72 90.24 39.45 80
4979 PURBA BARDHAMAN Burdwan Division RETROFITTING OF MAJHERGRAM PIPED WATER SUPPLY SCHEME(PART-B) , SM/16290 Retrofitting Sinking of 250 X 150mm dia Tube Well 150 mtr. Depth by D.R. Rig method using UPVC pipe (CM) and UPVC Medium Well Screen (RMS) for 2nd TW Site of Aug. of MAJHERGRAM & its adjoining mouzas Piped Water Supply Scheme, Block Monteswar, Dist - Purba Bardhaman under Burdwan Division, PHE Dte. Assistant Engineer ORD/000542/2022-2023 5094/BWD 17/11/2022 30 DAS CONSTRUCTION 8.71 7.77 89.21 1
4980 PURBA BARDHAMAN Burdwan Division RETROFITTING OF MAJHERGRAM PIPED WATER SUPPLY SCHEME(PART-B) , SM/16290 Retrofitting Interconnection in distribution system from OHR to in between 1st and 2nd Tube Well site for smooth functioning of FHTC work of MAJHERGRAM W/S Scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. ORD/000160/2023-2024 2575/BWD 01/06/2023 30 TULIP ENGINEERS CO-OPERATIVE SOCIETY LTD. 22.54 10.04 44.54 100
4981 PURBA BARDHAMAN Burdwan Division RETROFITTING OF MAJHERGRAM PIPED WATER SUPPLY SCHEME(PART-B) , SM/16290 Retrofitting Laying of UPVC pipeline & providing FHTC work at Dhanyakherur, Majhergram bazar & Hattola village of MAJHERGRAM Water Supply Scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer ORD/000161/2023-2024 2456/BWD 31/05/2023 30 PRONAB KUMAR DEY 9.68 2.80 28.93 100
4982 PURBA BARDHAMAN Burdwan Division RETROFITTING OF MAJHERGRAM PIPED WATER SUPPLY SCHEME(PART-B) , SM/16290 Retrofitting Providing FHTC & laying of HDPE pipe line for village of Madhyamgram, Dakshinpara, Binnerpar, Dhanyakherur of MAJHERGRAM PWSS of Manteswer Block under Burdwan Division, PHE Dte. Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer1, Durgapur Sub-Division, PHE Dte. ORD/000174/2024-2025 2251/BWD 18/06/2024 120 A.R. TRADERS 40.92 9.82 24 100
4983 PURBA BARDHAMAN Burdwan Division RETROFITTING OF MAJHERGRAM PIPED WATER SUPPLY SCHEME(PART-B) , SM/16290 Retrofitting Laying of 75 mm dia HDPE Pipe of Majhergram PWSS of Madhyamgram uttarpara village under Manteswar Block under Durgapur Sub Division of Burdwan Division ,P.H.E.Dte Junior Engineer1, Durgapur Sub-Division, PHE Dte. ORD/000762/2024-2025 908/DSD 28/10/2024 30 M/S GOSWAMI CONSTRUCTION 0.96 0.70 72.92 100
4984 PURBA BARDHAMAN Burdwan Division RETROFITTING OF MAJHERGRAM PIPED WATER SUPPLY SCHEME(PART-B) , SM/16290 Retrofitting Conducting physical Household Survey at the IMIS reported village for HGJ certification and providing balance FHTC for Har Ghar Jal certification including conducting Gram Sabhas for different IMIS reported villages across the district under Burdwan Division, PHE Dte. AE(HQs),Assistant Engineer ,Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE.,Assistant Engineer, Durgapur Sub Division, P.H.E. Dte JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000428/2024-2025 3107/BWD 12/08/2024 90 TUBGRAM GRAMMYAK UNNAYAN SAMITY 309.60 0.00 0 50
4985 PURBA BARDHAMAN Burdwan Division RETROFITTING OF MAJHERGRAM PIPED WATER SUPPLY SCHEME(PART-B) , SM/16290 Retrofitting Painting and others ancillary works related to OHR of MAJHERGRAM PWSS under Durgapur Sub Division of MANTESWER Block under Burdwan Division P.H.E.Dte. Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/001221/2024-2025 728/BWD 24/02/2025 45 A.R. TRADERS 7.02 0.00 0 0
4986 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED WATER SUPPLY SCHEME FOR JAUGRAM , SM/15602 Augmentation Laying of HDPE pipes with installation & construction of new valve chambers to control the flow of water within command area of JOUGRAM Piped W/S. Scheme at Jougram habitation, Jamalpur Block under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000761/2022-2023 1292/BWD 20/03/2023 30 DIPAK SARKAR 18.24 18.23 99.95 1
4987 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED WATER SUPPLY SCHEME FOR JAUGRAM , SM/15602 Augmentation Laying of Rising Main with interconnection of OHR and distribution line for JAUGRAM Piped Water Supply Scheme and its adjoining mouzas within Jamalpur Block under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000763/2022-2023 1297/BWD 21/03/2023 30 GOUTAM DEY 5.55 5.54 99.82 100
4988 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED WATER SUPPLY SCHEME FOR JAUGRAM , SM/15602 Augmentation Construction of 400 cum capacity 20 Mtr. staging height RCC Over Head Reservoir including pile foundation, pipe connection and cost of pipes, specials for JOUGRAM & It's Adjoining Mouzas W/S. scheme under Burdwan Sub-Division, Burdwan Division, P.H.E. Dte. Ref. Drawing No.PC-I/OHR/11/2012 (Sheet No.1&2)(R-I) Dated 20.06.2012. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. Junior Engineer, R.W.S. Burdwan Sub Division, P.H.E. Dt ORD/000020/2021-2022 3114/BWD 02/06/2021 180 SATYANARAYAN ENGINEERS CO. OP. SOCIETY LTD. 90.26 90.26 100 100
4989 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED WATER SUPPLY SCHEME FOR JAUGRAM , SM/15602 Augmentation Augmentation of JAUGRAM Piped Water Supply Scheme LDS, FHTC, land development, drain at different TW site under JAMALPUR Block, District:- Purba-Bardhaman. AE(HQs) Junior Engineer, Burdwan Division ORD/000171/2023-2024 3059/BWD 17/07/2023 682 SATYANARAYAN ENGINEERS CO. OP. SOCIETY LTD. 406.76 0.00 0 50
4990 PURBA BARDHAMAN Mangolkote Burdwan Division MASARU PIPE WATER SUPPLY SCHEME , SM/16020 New Material Requisition To Resource Division RTOR000341/2023-2024 2197/BWD 12/05/2023 Resource Division 13.25 0.00 0 0
4991 PURBA BARDHAMAN Mangolkote Burdwan Division MASARU PIPE WATER SUPPLY SCHEME , SM/16020 New Material Requisition To Resource Division RTOR000451/2023-2024 3975/BWD 08/09/2023 Resource Division 0.98 0.00 0 0
4992 PURBA BARDHAMAN Mangolkote Burdwan Division MASARU PIPE WATER SUPPLY SCHEME , SM/16020 New Material Requisition To Resource Division RTOR000582/2023-2024 4896/BWD 10/11/2023 Resource Division 13.36 0.00 0 0
4993 PURBA BARDHAMAN Mangolkote Central Mechanical MASARU PIPE WATER SUPPLY SCHEME , SM/16020 New New service connection charges for Mosharu PWSS TW-2 BILL/02194/2023-2024 BP-2023-24-375 16/01/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 4.85 0.00 0 0
4994 PURBA BARDHAMAN Mangolkote Central Mechanical MASARU PIPE WATER SUPPLY SCHEME , SM/16020 New New service connection charges for Mosharu PWSS TW-1 BILL/02195/2023-2024 BP-2023-24-374 16/01/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.41 0.00 0 0
4995 PURBA BARDHAMAN Mangolkote Central Mechanical MASARU PIPE WATER SUPPLY SCHEME , SM/16020 New Supply & Installation of Submersible Pumping Machinery , Voltage Stabilizer, Chlorination system and internal House wiring for Tube well no.- 1 & 2 at MASARU [MONGOLKOTE] Water Supply Scheme under CMD, PHE Dte., Dist.- Purba-Bardhaman. Driller In-Charge Junior Engineer ORD/000884/2023-2024 4147/CMD 29/08/2023 30 CHOUDHURY ENTERPRISE 21.27 0.00 0 46
4996 PURBA BARDHAMAN Mangolkote Burdwan Division MASARU PIPE WATER SUPPLY SCHEME , SM/16020 New MASARU Piped Water Supply Scheme with sinking of Tube-well, LDS, Construction of 100 cum RCC OHR with 20 mtr. staging height including soil testing, Rising Main, FHTC & construction of switch rooms & boundary walls with gates and land development, drain and internal pathway at different TW site under Mangalkote Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer JUNIOR ENGINEER KATWA SUB-DIVISION PHE DTE ORD/000495/2023-2024 3522/BWD 10/08/2023 601 M/S B.N. GUPTA 262.74 20.40 7.76 50
4997 PURBA BARDHAMAN Mangolkote Central Mechanical MASARU PIPE WATER SUPPLY SCHEME , SM/16020 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Lakshimpur & others water supply scheme under Mangalkote Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman Driller In-Charge Junior Engineer ORD/000097/2024-2025 2406/CMD 02/08/2024 290 CHOUDHURY ENTERPRISE 57.65 0.00 0 10
4998 PURBA BARDHAMAN Burdwan Division AUGUMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR KUENTA , SM/15718 Augmentation Pipeline with FHTC for KEUNTA Water Supply Scheme at Kalui village (30 Nos.), Keunta village (30 Nos.), Mandarpur village (30 Nos.), Rampur village (30 Nos.), Nandanpur village (60 Nos.), within Raina-II Block, under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000712/2022-2023 855/BWD 28/02/2023 45 DUBE ENTERPRISE 60.10 10.10 16.81 100
4999 PURBA BARDHAMAN Ketugram - II Burdwan Division LOHARUNDI PIPED WATER SUPPLY SCHEME , SM/16033 New Material Requisition To Resource Division RTOR000017/2023-2024 1962/BWD 25/04/2023 Resource Division 1.47 0.00 0 0
5000 PURBA BARDHAMAN Ketugram - II Burdwan Division LOHARUNDI PIPED WATER SUPPLY SCHEME , SM/16033 New Material Requisition To Resource Division RTOR000334/2023-2024 2197/BWD 12/05/2023 Resource Division 1.95 0.00 0 0
5001 PURBA BARDHAMAN Ketugram - II Burdwan Division LOHARUNDI PIPED WATER SUPPLY SCHEME , SM/16033 New Material Requisition To Resource Division RTOR000562/2023-2024 4936/BWD 10/11/2023 Resource Division 0.46 0.00 0 0
5002 PURBA BARDHAMAN Ketugram - II Central Mechanical LOHARUNDI PIPED WATER SUPPLY SCHEME , SM/16033 New Quotation for new service connection at Loharudni PWSS PH-2. BILL/00347/2024-2025 BP-2024-25-169 01/07/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.37 0.00 0 0
5003 PURBA BARDHAMAN Ketugram - II Central Mechanical LOHARUNDI PIPED WATER SUPPLY SCHEME , SM/16033 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Kankurhati & others water supply scheme under Ketugram-2 Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. Driller In-Charge Junior Engineer ORD/000103/2024-2025 2408/CMD 02/08/2024 90 DIPALI CONSTRUCTION 41.95 0.00 0 0
5004 PURBA BARDHAMAN Ketugram - II Burdwan Division LOHARUNDI PIPED WATER SUPPLY SCHEME , SM/16033 New Balance work for extension of pipeline to provide FHTC with land development, plinth protection for pump house under LOHARUNDI PWSS, Block-Ketugram-II under Katwa Sub Division within Burdwan Division PHE Dte. Assistant Engineer JUNIOR ENGINEER R.W.S. BURDWAN SUB-DIVISION PHE DTE ORD/000572/2024-2025 3313/BWD 06/09/2024 60 LAKSHMIKANTA DAS 9.88 0.00 0 0
5005 PURBA BARDHAMAN Ketugram - II Burdwan Division LOHARUNDI PIPED WATER SUPPLY SCHEME , SM/16033 New LOHARUNDI Piped Water Supply Scheme with sinking of Tube-well, LDS, Rising Main, FHTC, construction of switch rooms & boundary walls with gates and land development, drain and internal pathway at different TW site under KETUGRAM -II Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer JUNIOR ENGINEER R.W.S. BURDWAN SUB-DIVISION PHE DTE ORD/000875/2023-2024 5328/BWD 04/12/2023 484 OM ENTERPRISE 96.34 0.00 0 90
5006 PURBA BARDHAMAN Ketugram - II Central Mechanical LOHARUNDI PIPED WATER SUPPLY SCHEME , SM/16033 New Supply & Installation of Submersible Pumping Machinery , Voltage Stabilizer, Chlorination system and internal House wiring for Tube well no.- 1 & 2 at LOHARUNDI [KETUGRAM-II] Water Supply Scheme under CMD, PHE Dte., Dist.- Purba-Bardhaman. Driller In-Charge JUNIOR ENGINEER ORD/000891/2023-2024 4154/CMD 29/08/2023 640 AMUSAR IMPEX PVT. LTD. 21.26 0.00 0 46
5007 PURBA BARDHAMAN Ketugram - II Central Mechanical LOHARUNDI PIPED WATER SUPPLY SCHEME , SM/16033 New Supply and delivery of 6 HP pump motor set at T.W. No -1 of Loharundi (Block- Ketugram-II) water supply scheme under CMD, PHE Dte . Driller In-Charge JUNIOR ENGINEER ORD/000761/2024-2025 839/DIC/BMSD(D) 13/12/2024 7 S.K. ENTERPRISE 0.58 0.00 0 100
5008 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR NATUNGRAM , SM/15753 Augmentation Preparation and Submission of DPR for Augmentation of Natungram PWSS under Burdwan-I Development Block under Burdwan Division, P.H.E Dte.[2nd Call] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000347/2023-2024 1474/BSD 12/07/2023 15 MEASURE LAND 0.78 0.77 98.72 100
5009 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR NATUNGRAM , SM/15753 Augmentation Augmentation of NATUNGRAM Piped Water Supply Scheme Construction of 200 cum capacity RCC OHR with 20.0 mtr. with Staging height including soil investigation & Rising Main under BARDHAMAN-I Block, District:- Purba-Bardhaman. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000579/2023-2024 3726/BWD 25/08/2023 365 BASU ENTERPRISE 72.82 0.00 0 40
5010 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR NATUNGRAM , SM/15753 Augmentation Providing leftout FHTC with extension of Pipeline, construction of Pathway, drain, repairing of Pump House at Head Work site with allied works for NATUNGRAM and KHETIA Piped Water Supply Scheme, Block-Burdwan-I, within Burdwan Sub Division under Burdwan Division PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/001003/2024-2025 007/BWD 02/01/2025 90 M/S UNIQUE 33.59 0.00 0 0
5011 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR NATUNGRAM , SM/15753 Augmentation Providing 20 Nos.FHTC at AMAR & KAMODPUR village for declearation of SWAJALGRAM under NATUNGRAM Piped Water Supply Scheme, Block- Burdwan-I within Burdwan Sub Division under Burdwan Division PHE Dte. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000145/2024-2025 1034/BSD 10/06/2024 108 MANABSEBA PROKALPA & CONSTRUCTIONS 0.94 0.00 0 100
5012 PURBA BARDHAMAN Khandaghosh Burdwan Division SASANGA PIPED WATER SUPPLY SCHEME , SM/18245 New Material Requisition To Resource Division RTOR000296/2023-2024 2197/BWD 12/05/2023 Resource Division 6.45 0.00 0 0
5013 PURBA BARDHAMAN Khandaghosh Burdwan Division SASANGA PIPED WATER SUPPLY SCHEME , SM/18245 New Material Requisition To Resource Division RTOR000405/2023-2024 3827/BWD 01/09/2023 Resource Division 17.67 0.00 0 0
5014 PURBA BARDHAMAN Khandaghosh Burdwan Division SASANGA PIPED WATER SUPPLY SCHEME , SM/18245 New Material Requisition To Resource Division RTOR000574/2023-2024 4923/BWD 10/11/2023 Resource Division 41.11 0.00 0 0
5015 PURBA BARDHAMAN Khandaghosh Central Mechanical SASANGA PIPED WATER SUPPLY SCHEME , SM/18245 New New service connection charges for Sasanga PWSS TW-2 BILL/02210/2023-2024 BP-2023-24-401 17/01/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 2.50 0.00 0 0
5016 PURBA BARDHAMAN Khandaghosh Central Mechanical SASANGA PIPED WATER SUPPLY SCHEME , SM/18245 New New service connection charges for Sasanga PWSS TW-1 BILL/02209/2023-2024 BP-2023-24-400 17/01/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.46 0.00 0 0
5017 PURBA BARDHAMAN Khandaghosh Central Mechanical SASANGA PIPED WATER SUPPLY SCHEME , SM/18245 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1, 2 & 3 at SASANGA Water Supply Scheme [ Block-KHONDOGHOSH ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER Junior Engineer ORD/000921/2023-2024 4185/CMD 29/08/2023 30 P.K. ENGINEERING 45.37 0.00 0 90
5018 PURBA BARDHAMAN Khandaghosh Central Mechanical SASANGA PIPED WATER SUPPLY SCHEME , SM/18245 New Quotation for new service connection for Sasanga PWSS PH 2. BILL/00229/2024-2025 BP-2024-25-120 29/05/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 6.09 0.00 0 0
5019 PURBA BARDHAMAN Khandaghosh Central Mechanical SASANGA PIPED WATER SUPPLY SCHEME , SM/18245 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at BICHKHARA & others water supply scheme under Khandoghosh Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman ASSISTANT ENGINEER Junior Engineer ORD/000064/2024-2025 2390/CMD 02/08/2024 90 MS DAS ELECTRIC CO 46.54 0.00 0 0
5020 PURBA BARDHAMAN Khandaghosh Burdwan Division SASANGA PIPED WATER SUPPLY SCHEME , SM/18245 New Material Requisition To Resource Division RTOR000005/2024-2025 4116/BWD 25/11/2024 Resource Division 22.79 0.00 0 0
5021 PURBA BARDHAMAN Khandaghosh Burdwan Division SASANGA PIPED WATER SUPPLY SCHEME , SM/18245 New Field level data validation of FHTC executed by Agencies on the basis of pictorial data with the objective of controlling multiple entry,improving data quality in terms of absolute household by verification through electric connection or any other unique documents and making error free database of SASANGA Pipe Water Supply Scheme in Khandaghosh Block within Burdwan Sub-Division under Burdwan Division,PHE Dte JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000894/2024-2025 2673/BSD 04/12/2024 30 TECHVISION 1.48 0.00 0 0
5022 PURBA BARDHAMAN Khandaghosh Burdwan Division SASANGA PIPED WATER SUPPLY SCHEME , SM/18245 New Different works related (sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of different capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site) to ONARI & SASANGA Piped Water Supply Scheme under Khandaghosh Block, District:- Purba-Bardhaman [NEW SCHEME]_2ND CALL Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000452/2023-2024 3430/BWD 07/08/2023 786 M/S JAN MAHAMMAD 1,398.82 193.63 13.84 50
5023 PURBA BARDHAMAN Ketugram - I Burdwan Division EHIAPUR PIPED WATER SUPPLY SCHEME , SM/18342 New Material Requisition To Resource Division RTOR000250/2023-2024 2197/BWD 12/05/2023 Resource Division 4.15 0.00 0 0
5024 PURBA BARDHAMAN Ketugram - I Burdwan Division EHIAPUR PIPED WATER SUPPLY SCHEME , SM/18342 New Material Requisition To Resource Division RTOR000398/2023-2024 3874/BWD 01/09/2023 Resource Division 64.94 0.00 0 0
5025 PURBA BARDHAMAN Ketugram - I Central Mechanical EHIAPUR PIPED WATER SUPPLY SCHEME , SM/18342 New New service connection charges for Ehiapur PWSS TW-1 BILL/01470/2023-2024 BP-2023-24-168 27/09/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 5.42 0.00 0 0
5026 PURBA BARDHAMAN Ketugram - I Burdwan Division EHIAPUR PIPED WATER SUPPLY SCHEME , SM/18342 New Material Requisition To Resource Division RTOR000576/2023-2024 4924/BWD 10/11/2023 Resource Division 40.35 0.00 0 0
5027 PURBA BARDHAMAN Ketugram - I Central Drilling EHIAPUR PIPED WATER SUPPLY SCHEME , SM/18342 New Providing drilling crew and other allied works for construction of Tube Well (250mm X200mm X 114 Mtrs. Depth) by utilising Departmental Machineries for Ehiapur W/S Scheme (T/W-I & II) ,Ketugram-I Block under PurbaBardhman District, Central Drilling Division, P.H.E. Dte. Driller In Charge Junior Engineer ORD/000163/2023-2024 1348/CDD 13/09/2023 30 CHANDA ENTERPRISE 16.67 0.00 0 0
5028 PURBA BARDHAMAN Ketugram - I Central Mechanical EHIAPUR PIPED WATER SUPPLY SCHEME , SM/18342 New New service connection charges for Ehiapur PWSS TW-2 BILL/01727/2023-2024 BP-2023-24-259 07/12/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 2.82 0.00 0 0
5029 PURBA BARDHAMAN Ketugram - I Central Mechanical EHIAPUR PIPED WATER SUPPLY SCHEME , SM/18342 New New service connection charges for Ehiapur PWSS TW-3 BILL/01726/2023-2024 BP-2023-24-258 07/12/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 6.52 0.00 0 0
5030 PURBA BARDHAMAN Ketugram - I Central Mechanical EHIAPUR PIPED WATER SUPPLY SCHEME , SM/18342 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Rajur & others water supply scheme under Ketugram-I Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. Driller In-Charge Junior Engineer ORD/000098/2024-2025 2407/CMD 02/08/2024 90 M.S. ENTERPRISE 82.29 0.00 0 0
5031 PURBA BARDHAMAN Ketugram - I Burdwan Division EHIAPUR PIPED WATER SUPPLY SCHEME , SM/18342 New EHIAPUR Piped Water Supply Scheme with sinking of Tube-well, LDS, Rising Main, FHTC, Construction of 400 cum capacity RCC OHR with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drain and internal pathway at different TW site under KETUGRAM -I Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer JUNIOR ENGINEER R.W.S. BURDWAN SUB-DIVISION PHE DTE ORD/000456/2023-2024 3438/BWD 08/08/2023 365 M/S S.S. ENTERPRISE 732.05 338.26 46.21 75
5032 PURBA BARDHAMAN Ketugram - I Burdwan Division EHIAPUR PIPED WATER SUPPLY SCHEME , SM/18342 New Material Requisition To Resource Division RTOR000013/2024-2025 4111/BWD 25/11/2024 Resource Division 9.24 0.00 0 0
5033 PURBA BARDHAMAN Ketugram - I Burdwan Division EHIAPUR PIPED WATER SUPPLY SCHEME , SM/18342 New Balance Work For OHR, Extension Of Pipeline To Provide FHTC With Sinking Of Tube Well, Construction Of Pump House, Boundary Wall, Land Development, Plinth Protection For Pump House, Approach Road & Other Related Work Under Bakalsa, Chakdaha, Ehaipur, Khatundi And Ketugram (Zone-I) Part-A & B PWSS Under Katwa Sub Division, Block- Ketugram-I, Burdwan Division PHE Dte. Assistant Engineer JUNIOR ENGINEER R.W.S. BURDWAN SUB-DIVISION PHE DTE ORD/000288/2024-2025 2741/BWD 12/07/2024 120 M/S M.M. ENTERPRISE 205.15 0.00 0 65
5034 PURBA BARDHAMAN Ketugram - I Central Mechanical EHIAPUR PIPED WATER SUPPLY SCHEME , SM/18342 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1, 2 & 3 at EHIAPUR Water Supply Scheme [ Block- KETUGRAM-1 ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. Driller In-Charge Junior Engineer ORD/000843/2023-2024 4115/CMD 29/08/2023 615 ASHIM UDYOG 44.39 8.81 19.85 61
5035 PURBA BARDHAMAN Katwa - I Burdwan Division BANDMURA PIPED WATER SUPPLY SCHEME , SM/18480 New Material Requisition To Resource Division RTOR000549/2023-2024 4312/BWD 29/09/2023 Resource Division 73.01 0.00 0 0
5036 PURBA BARDHAMAN Katwa - I Burdwan Division BANDMURA PIPED WATER SUPPLY SCHEME , SM/18480 New Material Requisition To Resource Division RTOR000767/2023-2024 208/BWD 10/01/2024 Resource Division 21.50 0.00 0 0
5037 PURBA BARDHAMAN Katwa - I Central Mechanical BANDMURA PIPED WATER SUPPLY SCHEME , SM/18480 New NEW SERVICE CONNECTION FOR BANDMURA PWSS TW 1. BILL/02490/2023-2024 BP-2023-24-536 15/02/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 12.36 0.00 0 0
5038 PURBA BARDHAMAN Katwa - I Central Mechanical BANDMURA PIPED WATER SUPPLY SCHEME , SM/18480 New New service connection for Bandhmura PWSS PH-3. BILL/02906/2023-2024 BP-2023-24-615 07/03/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.32 0.00 0 0
5039 PURBA BARDHAMAN Katwa - I Central Mechanical BANDMURA PIPED WATER SUPPLY SCHEME , SM/18480 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Jajigram & others water supply scheme under Katwa-I Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman Driller In-Charge Junior Engineer ORD/000069/2024-2025 2399/CMD 02/08/2024 90 SUBRATA BHADRA 55.16 0.00 0 0
5040 PURBA BARDHAMAN Katwa - I Central Mechanical BANDMURA PIPED WATER SUPPLY SCHEME , SM/18480 New Quotation for new service connection for Bandmura PWSS TW-2. BILL/00776/2024-2025 BP-2024-25-292 13/09/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.03 0.00 0 0
5041 PURBA BARDHAMAN Katwa - I Burdwan Division BANDMURA PIPED WATER SUPPLY SCHEME , SM/18480 New BANDMURA Piped Water Supply Scheme with sinking of Tube-well, LDS, Rising Main, FHTC, Construction of 600 cum capacity RCC OHR with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drain and internal pathway at different TW site under Katwa-I Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer JUNIOR ENGINEER KATWA SUB-DIVISION PHE DTE,Junior Engineer, R.W.S., Katwa-I Dev. Block ORD/000830/2023-2024 5007/BWD 22/11/2023 406 MANASH GHOSH 883.19 0.00 0 35
5042 PURBA BARDHAMAN Katwa - I Central Mechanical BANDMURA PIPED WATER SUPPLY SCHEME , SM/18480 New continuation order for Hiring of Inspection Vehicle ( Diesel/CNG/LPG Driven) for supervision of JJM works under the jurisdiction of the Driller In charge, Bardhaman Mechanical Sub Division(Drilling) under CMD, PHE, Dte ,wef : 01/ 11/ 20 24 to 31/12/2024. Driller In-Charge Junior Engineer ORD/000526/2024-2025 739/DIC/BMSD(D) 25/10/2024 61 SUBRATA BHADRA 0.81 0.78 96.3 0
5043 PURBA BARDHAMAN Katwa - I Central Mechanical BANDMURA PIPED WATER SUPPLY SCHEME , SM/18480 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1, 2 & 3 at BANDMURA Water Supply Scheme [ Block- KATWA-1 ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. Driller In-Charge Junior Engineer ORD/000869/2023-2024 4132/CMD 29/08/2023 590 GLACIER ENGINEERING CO 44.42 11.91 26.81 31
5044 PURBA BARDHAMAN Katwa - I Central Mechanical BANDMURA PIPED WATER SUPPLY SCHEME , SM/18480 New Hiring of Inspection Vehicle ( Diesel/CNG/LPG Driven) for supervision of JJM works under the jurisdiction of the Driller In charge, Bardhaman Mechanical Sub Division(Drilling) under CMD, PHE, Dte , w.e.f : 01/ 01/ 2025 to 28/02/2025 Driller In-Charge JUNIOR ENGINEER ORD/000657/2024-2025 922/DIC/BMSD(D) 26/12/2024 59 SUBRATA BHADRA 0.80 0.74 92.5 0
5045 PURBA BARDHAMAN Katwa - I Burdwan Division BANDMURA PIPED WATER SUPPLY SCHEME , SM/18480 New Providing of left out FHTC in different location of BANDHMURA PWSS (SM/18480) at Ganfulia Mouza in order to declare Sajal Gram, under Katwa-II Block under Katwa Sub-Division, PHE Dte. Assistant Engineer ORD/001317/2024-2025 983/BWD 13/03/2025 21 MANASH GHOSH 9.43 0.00 0 0
5046 PURBA BARDHAMAN Katwa - I Central Mechanical BANDMURA PIPED WATER SUPPLY SCHEME , SM/18480 New Continuation order for hiring of Inspection Vehicle ( Diesel/CNG/LPG Driven) for supervision of JJM works under the jurisdiction of the Driller In charge, Bardhaman Mechanical Sub Division(Drilling) under CMD, PHE, Dte , w.e.f : 01/03/2025 to 30/04/2025. Driller In-Charge JUNIOR ENGINEER ORD/000917/2024-2025 134/DIC/BMSD(D) 24/02/2025 61 SUBRATA BHADRA 0.81 0.00 0 0
5047 PURBA BARDHAMAN Raina - II Burdwan Division DIGHRA PIPED WATER SUPPLY SCHEME , SM/18482 New Material Requisition To Resource Division RTOR000248/2023-2024 2197/BWD 12/05/2023 Resource Division 15.00 0.00 0 0
5048 PURBA BARDHAMAN Raina - II Burdwan Division DIGHRA PIPED WATER SUPPLY SCHEME , SM/18482 New Material Requisition To Resource Division RTOR000421/2023-2024 3861/BWD 01/09/2023 Resource Division 15.75 0.00 0 0
5049 PURBA BARDHAMAN Raina - II Burdwan Division DIGHRA PIPED WATER SUPPLY SCHEME , SM/18482 New Material Requisition To Resource Division RTOR000666/2023-2024 5087/BWD 23/11/2023 Resource Division 20.46 0.00 0 0
5050 PURBA BARDHAMAN Raina - II Central Mechanical DIGHRA PIPED WATER SUPPLY SCHEME , SM/18482 New New Service connection for Dighra W/S Scheme PH No.-I BILL/01796/2023-2024 BP-2023-24-322 30/12/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 5.03 0.00 0 0
5051 PURBA BARDHAMAN Raina - II Central Mechanical DIGHRA PIPED WATER SUPPLY SCHEME , SM/18482 New NEW SERVICE CONNECTION FOR DIGHRA PWSS BILL/02590/2023-2024 BP-2023-24-556 20/02/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 5.16 0.00 0 0
5052 PURBA BARDHAMAN Raina - II Burdwan Division DIGHRA PIPED WATER SUPPLY SCHEME , SM/18482 New DIGHRA Piped Water Supply Scheme with sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of 350 cum capacity RCC OHRs with 20.0 mtr. Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site under RAINA-II Block, District:- Purba Bardhaman [NEW SCHEME] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000485/2023-2024 3506/BWD 10/08/2023 365 M/S PIONEER CONSTRUCTION 661.73 0.00 0 40
5053 PURBA BARDHAMAN Raina - II Central Mechanical DIGHRA PIPED WATER SUPPLY SCHEME , SM/18482 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Satinandi,Sanko & others water supply scheme under Galsi-1 Block ; Serpur, Uchalan & others water supply scheme under Raina-2 Block and maro, loapur & others water supply scheme under Galsi-2 block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000397/2024-2025 2751/CMD 24/09/2024 90 ORIENTAL ENGINEERING CO. 88.42 0.00 0 0
5054 PURBA BARDHAMAN Raina - II Burdwan Division DIGHRA PIPED WATER SUPPLY SCHEME , SM/18482 New Material Requisition To Resource Division RTOR000011/2024-2025 4113/BWD 25/11/2024 Resource Division 17.04 0.00 0 0
5055 PURBA BARDHAMAN Raina - II Central Mechanical DIGHRA PIPED WATER SUPPLY SCHEME , SM/18482 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at DIGHRA Water Supply Scheme [ Block- RAINA-2] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000841/2023-2024 4113/CMD 29/08/2023 642 GOENKA ENTERPRISE 28.98 0.00 0 85
5056 PURBA BARDHAMAN Raina - II Burdwan Division DIGHRA PIPED WATER SUPPLY SCHEME , SM/18482 New Sinking of 300 X 200mm dia Tube Well 150 mtr. Depth by D.R. Rig method using UPVC pipe (CD) and UPVC Deep Well Screen (RDS) at KONARPUR (3rd TW site) under DIGHRA Piped Water Supply Scheme under RAINA-II Block, District:- Purba-Bardhaman. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000011/2025-2026 1212/BWD 21/04/2025 45 A.R. TRADERS 13.63 0.00 0 0
5057 PURBA BARDHAMAN Central Mechanical AUGMENTATION OF SIMLON PWSS FOR PROVIDING FUNCTIONAL HOUSEHOLD TAP CONNECTION (FHTC) BLOCK KALNA I PURBA BARDHAMAN WEST BENGAL , SM/18439 Augmentation Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination system and internal House wiring for Tube well no.- 1 & 2 at Augumentation of SIMLON (ZONE-I & II) [KALNA-I] Water Supply Scheme under CMD, PHE Dte., Dist.- Purba-Bardhaman. ORD/001301/2023-2024 259/CMD 19/01/2024 30 DUTTA ENTERPRISE 24.40 0.00 0 0
5058 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF SIMLON PWSS FOR PROVIDING FUNCTIONAL HOUSEHOLD TAP CONNECTION (FHTC) BLOCK KALNA I PURBA BARDHAMAN WEST BENGAL , SM/18439 Augmentation Quotation from WBSEDCL for Shifting of 33 KV & LTOH line at Briddhapara village against 1st T.W. of Simlon w/s scheme. BILL/00172/2024-2025 270/JJM 21/05/2024 WBSEDCL 14.29 0.00 0 0
5059 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF SIMLON PWSS FOR PROVIDING FUNCTIONAL HOUSEHOLD TAP CONNECTION (FHTC) BLOCK KALNA I PURBA BARDHAMAN WEST BENGAL , SM/18439 Augmentation Laying of rising main along with crossing of pipe line by HDD/Jack pushing method due to widening of Bardhaman-Kalna Road via Simlon in connection with Augmentation of SIMLON Piped Water Supply Scheme under Kalna Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000129/2024-2025 2070/BWD 07/06/2024 120 MANASH GHOSH 199.36 0.00 0 100
5060 PURBA BARDHAMAN Central Mechanical AUGMENTATION OF SIMLON PWSS FOR PROVIDING FUNCTIONAL HOUSEHOLD TAP CONNECTION (FHTC) BLOCK KALNA I PURBA BARDHAMAN WEST BENGAL , SM/18439 Augmentation Illumination arrangement and miscellaneous works at Simlon water supply scheme under Kalna-1 Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000402/2024-2025 2781/CMD 01/10/2024 60 SUDIPTA GHOSH 9.50 0.00 0 0
5061 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF SIMLON PWSS FOR PROVIDING FUNCTIONAL HOUSEHOLD TAP CONNECTION (FHTC) BLOCK KALNA I PURBA BARDHAMAN WEST BENGAL , SM/18439 Augmentation Digital structurization of pipeline alignment and asset evaluation including holistic design, preparation of design drawings of overall LDS & preparation of estimate for 11 Nos. Piped W/S. Schemes under Kalna I Block under Kalna Sub-Division under Burdwan Division, PHE. Dte. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000335/2024-2025 3015/BWD 05/08/2024 60 HORIZEN 29.60 0.00 0 10
5062 PURBA BARDHAMAN Central Mechanical AUGMENTATION OF SIMLON PWSS FOR PROVIDING FUNCTIONAL HOUSEHOLD TAP CONNECTION (FHTC) BLOCK KALNA I PURBA BARDHAMAN WEST BENGAL , SM/18439 Augmentation Quotation for new service connection at Simlon Zone-2 PWSS TW-1. BILL/01190/2024-2025 BP-2024-25-411 11/12/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.61 0.00 0 0
5063 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF SIMLON PWSS FOR PROVIDING FUNCTIONAL HOUSEHOLD TAP CONNECTION (FHTC) BLOCK KALNA I PURBA BARDHAMAN WEST BENGAL , SM/18439 Augmentation Supply & Laying of 300mm Dia M.S.E.R.W Pipe including Jack Pushing along with other allied work in connection with different Augmentation & New [(SM/18439, SM/14437, SM/14435, SM/07805, SM/14440, SM/15571, SM/08030, SM/16014, SM/15588, SM/16298 & SM/16307)] under Kalna Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/001187/2024-2025 608/BWD 11/02/2025 180 MANASH GHOSH 1,209.62 0.00 0 0
5064 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF SIMLON PWSS FOR PROVIDING FUNCTIONAL HOUSEHOLD TAP CONNECTION (FHTC) BLOCK KALNA I PURBA BARDHAMAN WEST BENGAL , SM/18439 Augmentation AUGMENTATION OF SIMLON Piped Water Supply Scheme with sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of 500 cum capacity RCC OHRs with 20.0 mtr. Staging height including soil investigation (2 Nos.) & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site OF ZONE-I & ZONE-II under KALNA-I Block, District:- Purba Bardhaman. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE,Junior Engineer, R.W.S. Burdwan Sub Division, P.H.E. Dt ORD/000460/2023-2024 3442/BWD 08/08/2023 603 MANASH GHOSH 1,406.99 282.00 20.04 60
5065 PURBA BARDHAMAN Central Mechanical AUGMENTATION OF SIMLON PWSS FOR PROVIDING FUNCTIONAL HOUSEHOLD TAP CONNECTION (FHTC) BLOCK KALNA I PURBA BARDHAMAN WEST BENGAL , SM/18439 Augmentation WBSEDCL Quotation for new service connection at Simlon zone-I water supply scheme, P/H no.-III. BILL/01827/2024-2025 null 21/03/2025 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 7.73 0.00 0 null
5066 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF SIMLON PWSS FOR PROVIDING FUNCTIONAL HOUSEHOLD TAP CONNECTION (FHTC) BLOCK KALNA I PURBA BARDHAMAN WEST BENGAL , SM/18439 Augmentation Restoration work of link Road to Bridhapara Road from Burdwan kalna Road from 0.00 km to 1.00 km (In stretches) damaged due to laying of under ground drinking water pipe line by the PHE dte with box cutting and jhama metal consolidation 20 mm thick premixed surfacing etc under Kalna Highway Sub Division of Burdwan South High Division in the District of Purba Bardhaman.(Withheld 50% as per GO issued by PWD & PHE) BILL/00084/2025-2026 null 25/04/2025 EXECUTIVE ENGINEER BURDWAN SOUTH HIGHWAY DIVISION P.W. (ROADS) DTE. 1.55 0.00 0 null
5067 PURBA BARDHAMAN Manteswar Burdwan Division GROUND WATER SUPPLY BASED PIPED WATER SUPPLY SCHEME FOR UJNA PWSS IN MANTESHWAR BLOCK OF PURBA BARDHAMAN DISTRICT UNDER BURDWAN DIVISION PHE DTE , SM/18422 New Material Requisition To Resource Division RTOR000333/2023-2024 2197/BWD 12/05/2023 Resource Division 19.69 0.00 0 0
5068 PURBA BARDHAMAN Manteswar Burdwan Division GROUND WATER SUPPLY BASED PIPED WATER SUPPLY SCHEME FOR UJNA PWSS IN MANTESHWAR BLOCK OF PURBA BARDHAMAN DISTRICT UNDER BURDWAN DIVISION PHE DTE , SM/18422 New Material Requisition To Resource Division RTOR000447/2023-2024 3971/BWD 08/09/2023 Resource Division 129.95 0.00 0 0
5069 PURBA BARDHAMAN Manteswar Central Mechanical GROUND WATER SUPPLY BASED PIPED WATER SUPPLY SCHEME FOR UJNA PWSS IN MANTESHWAR BLOCK OF PURBA BARDHAMAN DISTRICT UNDER BURDWAN DIVISION PHE DTE , SM/18422 New New service connection charges for Ujna PWSS TW-2 BILL/01708/2023-2024 BP-2023-24-235 06/12/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.34 0.00 0 0
5070 PURBA BARDHAMAN Manteswar Burdwan Division GROUND WATER SUPPLY BASED PIPED WATER SUPPLY SCHEME FOR UJNA PWSS IN MANTESHWAR BLOCK OF PURBA BARDHAMAN DISTRICT UNDER BURDWAN DIVISION PHE DTE , SM/18422 New Material Requisition To Resource Division RTOR000794/2023-2024 316/BWD 24/01/2024 Resource Division 47.08 0.00 0 0
5071 PURBA BARDHAMAN Manteswar Central Mechanical GROUND WATER SUPPLY BASED PIPED WATER SUPPLY SCHEME FOR UJNA PWSS IN MANTESHWAR BLOCK OF PURBA BARDHAMAN DISTRICT UNDER BURDWAN DIVISION PHE DTE , SM/18422 New New service connection charges for Ujna PWSS TW-1 BILL/02199/2023-2024 BP-2023-24-406 17/01/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.99 0.00 0 0
5072 PURBA BARDHAMAN Manteswar Central Mechanical GROUND WATER SUPPLY BASED PIPED WATER SUPPLY SCHEME FOR UJNA PWSS IN MANTESHWAR BLOCK OF PURBA BARDHAMAN DISTRICT UNDER BURDWAN DIVISION PHE DTE , SM/18422 New New service connection charges for Ujna PWSS TW-3 BILL/02200/2023-2024 BP-2023-24-406 17/01/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 6.70 0.00 0 0
5073 PURBA BARDHAMAN Manteswar Central Mechanical GROUND WATER SUPPLY BASED PIPED WATER SUPPLY SCHEME FOR UJNA PWSS IN MANTESHWAR BLOCK OF PURBA BARDHAMAN DISTRICT UNDER BURDWAN DIVISION PHE DTE , SM/18422 New ADDITIONAL QUOTATION FOR NEW SERVICE CONNECTION FOR UJNA PWSS PH-3 BILL/00187/2024-2025 BP-2024-25-88 15/05/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 0.30 0.00 0 0
5074 PURBA BARDHAMAN Manteswar Central Mechanical GROUND WATER SUPPLY BASED PIPED WATER SUPPLY SCHEME FOR UJNA PWSS IN MANTESHWAR BLOCK OF PURBA BARDHAMAN DISTRICT UNDER BURDWAN DIVISION PHE DTE , SM/18422 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1, 2 & 3 at UJNA Water Supply Scheme [ Block- MONTESWAR ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000781/2023-2024 4074/CMD 29/08/2023 30 CONCORD ENGINEERING 44.42 0.00 0 90
5075 PURBA BARDHAMAN Manteswar Burdwan Division GROUND WATER SUPPLY BASED PIPED WATER SUPPLY SCHEME FOR UJNA PWSS IN MANTESHWAR BLOCK OF PURBA BARDHAMAN DISTRICT UNDER BURDWAN DIVISION PHE DTE , SM/18422 New Different works related (sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of different capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site) to DHENUA, IBRAMBAD & UJNA Piped Water Supply Scheme under Manteswar Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer ,JUNIOR ENGINEER DURGAPUR SUB-DIVISION PHE DTE ORD/000462/2023-2024 3456/BWD 08/08/2023 365 M/S S. CHOUDHURY 2,123.70 0.00 0 20
5076 PURBA BARDHAMAN Manteswar Central Mechanical GROUND WATER SUPPLY BASED PIPED WATER SUPPLY SCHEME FOR UJNA PWSS IN MANTESHWAR BLOCK OF PURBA BARDHAMAN DISTRICT UNDER BURDWAN DIVISION PHE DTE , SM/18422 New Supply and installation of Electro-Magnetic flow meter at Bazar Mahammadpur, Dhatrigram, Arjunpukur & others water supply scheme under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000590/2024-2025 3105/CMD 11/12/2024 60 SHREE BISHNU CONSTRUCTION 19.77 0.00 0 0
5077 PURBA BARDHAMAN Manteswar Central Mechanical GROUND WATER SUPPLY BASED PIPED WATER SUPPLY SCHEME FOR UJNA PWSS IN MANTESHWAR BLOCK OF PURBA BARDHAMAN DISTRICT UNDER BURDWAN DIVISION PHE DTE , SM/18422 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Sutra & others water supply scheme under Monteswar Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000068/2024-2025 2396/CMD 02/08/2024 455 SINHA ELECTRICALS 78.06 0.00 0 20
5078 PURBA BARDHAMAN Katwa - II Burdwan Division AURIA PIPED WATER SUPPLY SCHEME , SM/18455 New Material Requisition To Resource Division RTOR000213/2023-2024 2155/BWD 10/05/2023 Resource Division 17.33 0.00 0 0
5079 PURBA BARDHAMAN Katwa - II Burdwan Division AURIA PIPED WATER SUPPLY SCHEME , SM/18455 New Material Requisition To Resource Division RTOR000433/2023-2024 3853/BWD 01/09/2023 Resource Division 64.75 0.00 0 0
5080 PURBA BARDHAMAN Katwa - II Central Mechanical AURIA PIPED WATER SUPPLY SCHEME , SM/18455 New New service connection charges for Auria PWSS TW-1 BILL/01518/2023-2024 BP-2023-24-188 09/10/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.89 0.00 0 0
5081 PURBA BARDHAMAN Katwa - II Central Mechanical AURIA PIPED WATER SUPPLY SCHEME , SM/18455 New New service connection charges for Auria PWSS TW-2 BILL/01519/2023-2024 BP-2023-24-189 09/10/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.77 0.00 0 0
5082 PURBA BARDHAMAN Katwa - II Central Mechanical AURIA PIPED WATER SUPPLY SCHEME , SM/18455 New New service connection charges for Auria PWSS TW-3 BILL/01520/2023-2024 BP-2023-24-190 09/10/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 7.00 0.00 0 0
5083 PURBA BARDHAMAN Katwa - II Central Mechanical AURIA PIPED WATER SUPPLY SCHEME , SM/18455 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1, 2 & 3 at AURIA Water Supply Scheme [ Block- KATWA-2 ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. Driller In-Charge Junior Engineer ORD/000802/2023-2024 4088/CMD 29/08/2023 30 ORIENTAL ENGINEERING CO. 44.40 0.00 0 64
5084 PURBA BARDHAMAN Katwa - II Central Mechanical AURIA PIPED WATER SUPPLY SCHEME , SM/18455 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Mulgram & others water supply scheme under Katwa-II Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. ASSISTANT ENGINEER Junior Engineer ORD/000070/2024-2025 2409/CMD 02/08/2024 90 DUTTA ENTERPRISE 50.18 0.00 0 0
5085 PURBA BARDHAMAN Katwa - II Burdwan Division AURIA PIPED WATER SUPPLY SCHEME , SM/18455 New Different works related (sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of different capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site) to AMUL & AURIA Piped Water Supply Scheme under Katwa ¿ II Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer JUNIOR ENGINEER KATWA SUB-DIVISION PHE DTE ORD/000389/2023-2024 3198/BWD 24/07/2023 707 MANASH GHOSH 1,418.89 408.01 28.76 48
5086 PURBA BARDHAMAN Katwa - II Central Mechanical AURIA PIPED WATER SUPPLY SCHEME , SM/18455 New Supply and installation of Electro-Magnetic flow meter at AURIA, KARUI & others water supply scheme under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. Driller In-Charge JUNIOR ENGINEER ORD/000602/2024-2025 3106/CMD 11/12/2024 60 S.K. ELECTRICALS 13.60 0.00 0 0
5087 PURBA BARDHAMAN Katwa - II Burdwan Division AURIA PIPED WATER SUPPLY SCHEME , SM/18455 New Material Requisition To Resource Division RTOR000050/2024-2025 330/BWD 15/01/2025 Resource Division 3.44 0.00 0 0
5088 PURBA BARDHAMAN Katwa - II Central Mechanical AURIA PIPED WATER SUPPLY SCHEME , SM/18455 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.- 2 at Augumentation of Agradip Kashipur (Babladanga) Water Supply Scheme [BLOCK- Katwa-II ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. Driller In-Charge Junior Engineer ORD/000544/2024-2025 2445/CMD 07/08/2024 300 SUBRATA BHADRA 11.63 0.00 0 91
5089 PURBA BARDHAMAN Galsi - I Durgapur W/S Division Sub-Surface Water based Piped Water Supply Scheme for 11 nos. Mouzas under Galsi-I Block , SM/18679 New Continuation order for the work of Computer routine maintenance and software's installation including supply of computer peripherals and Stationeries etc. for use office under DWSD, PHE Dte (w.e.f 01.06.2024 to 30.05.2025) Assistant Engineer-II Contractual Junior Engineer_1,Contractual Junior Engineer_5,JUNIOR ENGINEER-1 ORD/000025/2024-2025 575/DWSD 22/04/2024 365 JOY GURU ENTERPRISE 3.79 0.00 0 0
5090 PURBA BARDHAMAN Galsi - I Durgapur W/S Division Sub-Surface Water based Piped Water Supply Scheme for 11 nos. Mouzas under Galsi-I Block , SM/18679 New Hiring of LUXURY Diesel Ambassador Car (Inspection Vehicle) for using of the Assistant Engineer-I under office of the Executive Engineer, Durgapur Water Supply Division, Public Health Engineering Dte at Fagupur, Nababhat, Purba Bardhaman for the period of 01.03.2024 to 31.08.2024 (6 Months)(Sl-03) Assistant Engineer-I,Assistant Engineer-II JUNIOR ENGINEER-1,JUNIOR ENGINEER-2 ORD/000296/2023-2024 269/DWSD 29/02/2024 180 BIPLAB BANERJEE 0.82 0.00 0 0
5091 PURBA BARDHAMAN Galsi - I Durgapur W/S Division Sub-Surface Water based Piped Water Supply Scheme for 11 nos. Mouzas under Galsi-I Block , SM/18679 New Acceptance cum Formal Work Order for the work of Sinking of 3 nos 300 x 200 mm dia T/W 150 mtr and 20Nos 200 x 200 mm dia Riverbank T/W 51 mtr with Construction of P/H cum switch room chlorine room at Uchagram under 11 nos mouzas PWSS (JJM), Block:- Galsi-I, Dist- Purba Bardhaman. Assistant Engineer-I,Assistant Engineer-II JUNIOR ENGINEER-1,JUNIOR ENGINEER-2 ORD/000310/2023-2024 373/DWSD 15/03/2024 90 S & P ENTERPRISE 72.51 0.00 0 50
5092 PURBA BARDHAMAN Galsi - I Burdwan Division Sub-Surface Water based Piped Water Supply Scheme for 11 nos. Mouzas under Galsi-I Block , SM/18679 New Hydro-geological study of Sub Surface Water Flow/Storage Characteristics for Creation of Sustainable Source and Estimation of Sustainable Yield (5 Nos of Schemes) in Purba Bardhaman District, West Bengal towards implementation of water supply project. ORD/000872/2023-2024 5324/BWD 01/12/2023 120 THE REGISTRAR JADAVPUR UNIVERSITY 113.34 0.00 0 100
5093 PURBA BARDHAMAN Galsi - I Burdwan Division Sub-Surface Water based Piped Water Supply Scheme for 11 nos. Mouzas under Galsi-I Block , SM/18679 New Piped Water Supply Scheme for different Mouzas works related (LDSs, Rising Mains, FHTCs, Constn. CWR, Construction of different capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site) under Galsi-I Block, District:- Purba-Bardhaman [NEW SCHEME] (For Pursha, Uchhagram & Rampur Jurisdiction) ORD/000475/2023-2024 3761/BWD 29/08/2023 730 S & P ENTERPRISE 1,827.37 0.00 0 35
5094 PURBA BARDHAMAN Galsi - I Durgapur W/S Division Sub-Surface Water based Piped Water Supply Scheme for 11 nos. Mouzas under Galsi-I Block , SM/18679 New Quotation for new electricity connection for 11 Nos sub-surface PWSS under DWSD PHE Dte BILL/00240/2024-2025 BP-2024-25-112 09/01/2025 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED 5.99 0.00 0 0
5095 PURBA BARDHAMAN Galsi - I Central Mechanical Sub-Surface Water based Piped Water Supply Scheme for 11 nos. Mouzas under Galsi-I Block , SM/18679 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Zone- Pursa, Uchchagram &, Rampur at 11 nos. Mouja Water Supply Scheme [ BLOCK- Galsi-I ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. Driller In-Charge JUNIOR ENGINEER ORD/000605/2024-2025 3100/CMD 11/12/2024 60 PROGRESSIVE ENGINEERS CO-OPERATIVE SOCIETY LIMITED 37.78 0.00 0 0
5096 PURBA BARDHAMAN Galsi - I Central Mechanical Sub-Surface Water based Piped Water Supply Scheme for 11 nos. Mouzas under Galsi-I Block , SM/18679 New Supply and installation of Electrical operated butterfly valve at delivery outlet of OHR at Mahindar water supply scheme [Block- Jamalpur] under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. ASSISTANT ENGINEER Junior Engineer ORD/000715/2024-2025 3104/CMD 11/12/2024 60 M/S D G B ENTERPRISE 11.02 0.00 0 0
5097 PURBA BARDHAMAN Galsi - I Durgapur W/S Division Sub-Surface Water based Piped Water Supply Scheme for 11 nos. Mouzas under Galsi-I Block , SM/18679 New Formal Work Order for Laying of Rising Main including Jack Pushing and construction of Pipe carring Bridge with Pipe supporting structure under PURANGRAM and 11 nos Mouzas Piped Water Supply Scheme under Durgapur W/S Division, PHE Dte. Assistant Engineer-II JUNIOR ENGINEER-2 ORD/000157/2024-2025 1503/DWSD 05/11/2024 120 MANASH GHOSH 1,075.24 0.00 0 50
5098 PURBA BARDHAMAN Galsi - I Durgapur W/S Division Sub-Surface Water based Piped Water Supply Scheme for 11 nos. Mouzas under Galsi-I Block , SM/18679 New Acceptance cum Formal Work Order for Design Engineering Services of Survey, General arrangement drawing, Pile foundation design and drawings, Pipe Pedestal and BOM, Structural design design and drawing, Fabrication drawings for 26 Numbers different dia meter pipe crossing Pipe Bridge at "PURANGAN (Zone-I, II, III), 11 Nos. Mouzas under PURSHA and UCHCHGRAM, SHILLA (Zone-I, II, III, IV), TAHER PUR (Zone-I, II, III) and KHANO (Zone-I and II) sites under Durgapur W/S Division,PHE Dte. Assistant Engineer-II JUNIOR ENGINEER-2 ORD/000105/2024-2025 1058/DWSD 25/07/2024 270 ASTER CONSULTANCY 47.43 0.00 0 70
5099 PURBA BARDHAMAN Galsi - I Central Mechanical Sub-Surface Water based Piped Water Supply Scheme for 11 nos. Mouzas under Galsi-I Block , SM/18679 New Supply, installation, commissioning of Electro-Mechanical and instrumentation components at newly constructed Boosting Station under Purangan & 11 nos. Mouza water supply scheme under Central Mechanical Division PHE Dte. ASSISTANT ENGINEER Junior Engineer ORD/000774/2024-2025 479/CMD 06/02/2025 75 S.P. CONSTRUCTION 135.24 0.00 0 0
5100 PURBA BARDHAMAN Galsi - I Durgapur W/S Division Sub-Surface Water based Piped Water Supply Scheme for 11 nos. Mouzas under Galsi-I Block , SM/18679 New Continuation order for Hiring of LUXURY Diesel Ambassador Car (Inspection Vehicle) for using of the Assistant Engineer-I under office of the Executive Engineer, Durgapur Water Supply Division, Public Health Engineering Dte at Fagupur, Nababhat, Purba Bardhaman for the period of 01.09.2024 to 28.02.2025 (6 Months)(Sl-03) Assistant Engineer-II JUNIOR ENGINEER-1 ORD/000137/2024-2025 1250/DWSD 30/08/2024 180 BIPLAB BANERJEE 0.82 1.19 145.12 0
5101 PURBA BARDHAMAN Galsi - I Durgapur W/S Division Sub-Surface Water based Piped Water Supply Scheme for 11 nos. Mouzas under Galsi-I Block , SM/18679 New Formal Work Order for Additional work of Soil investigation & construction of CWR/Pump House etc, Land development of H/W Site,drain & internal Path Way, Concrete Road Restoration,FHTC with Platform with necessary allied Works of Sub Surface Based PURANGAN Pipe W/S Scheme (JJM) under Galsi - I Block, Dist - Purba- Bardhaman ,under Durgapur Water Supply Division, PHE Dte. Assistant Engineer-II JUNIOR ENGINEER-2 ORD/000163/2024-2025 1521/DWSD 11/11/2024 180 MANASH GHOSH 789.87 0.00 0 51
5102 PURBA BARDHAMAN Galsi - I Central Mechanical Sub-Surface Water based Piped Water Supply Scheme for 11 nos. Mouzas under Galsi-I Block , SM/18679 New Providing Mechanical/Electrical equipment with all ancillaries and auxiliaries including intake (Low lift) pumping machineries, High Lift pumping machineries, 0-1 kg/hour gaseous chlorination system and illumination arrangement of Taherpur & Khano Sub-Surface Based Piped Water Supply Scheme under Purba Bardhaman District PHE Dte. ASSISTANT ENGINEER Junior Engineer ORD/000002/2025-2026 904/CMD 04/04/2025 75 SINHA ELECTRICALS 329.09 0.00 0 0
5103 PURBA BARDHAMAN Galsi - I Central Mechanical Sub-Surface Water based Piped Water Supply Scheme for 11 nos. Mouzas under Galsi-I Block , SM/18679 New Providing Mechanical/Electrical equipment with all ancillaries and auxiliaries including intake (Low lift) pumping machineries, High Lift pumping machineries, 0-1 kg/hour gaseous chlorination system and illumination arrangement of Purangan & 11 nos. mouza Sub-Surface Based Piped Water Supply Scheme under Purba Bardhaman District PHE Dte. ASSISTANT ENGINEER Junior Engineer ORD/000003/2025-2026 905/CMD 04/04/2025 75 WEST BENGAL ENGINEERING CO. 317.99 0.00 0 0
5104 PURBA BARDHAMAN Galsi - I Central Mechanical Sub-Surface Water based Piped Water Supply Scheme for 11 nos. Mouzas under Galsi-I Block , SM/18679 New Providing Mechanical/Electrical equipment with all ancillaries and auxiliaries including intake (Low lift) pumping machineries, illumination arrangement of Shilla Sub-Surface Based Piped Water Supply Scheme under Purba Bardhaman District PHE Dte. Driller In-Charge Junior Engineer ORD/000004/2025-2026 906/CMD 04/04/2025 75 JAL PRAVAHIKA PVT LTD 131.56 0.00 0 0
5105 PURBA BARDHAMAN Galsi - I Central Mechanical Sub-Surface Water based Piped Water Supply Scheme for 11 nos. Mouzas under Galsi-I Block , SM/18679 New Providing Mechanical/Electrical equipment with all ancillaries and auxiliaries including High Lift pumping machineries, 0-1 kg/hour gaseous chlorination system of Shilla Sub-Surface Based Piped Water Supply Scheme under Purba Bardhaman District PHE Dte. Driller In-Charge JUNIOR ENGINEER ORD/000001/2025-2026 903/CMD 04/04/2025 75 DEY ENTERPRISE 211.00 0.00 0 0
5106 PURBA BARDHAMAN Galsi - I Durgapur W/S Division Sub-Surface Water based Piped Water Supply Scheme for 11 nos. Mouzas under Galsi-I Block , SM/18679 New Continuation order for Hiring of LUXURY Diesel Ambassador Car (Inspection Vehicle) for using of the Assistant Engineer-I under office of the Executive Engineer, Durgapur Water Supply Division, Public Health Engineering Dte at Fagupur, Nababhat, Purba Bardhaman for the period of 01.03.2025 to 31.05.2025. Assistant Engineer-II JUNIOR ENGINEER-1 ORD/000273/2024-2025 334/DWSD 27/02/2025 90 BIPLAB BANERJEE 0.41 0.00 0 35
5107 PURBA BARDHAMAN Galsi - I Durgapur W/S Division Sub-Surface Water based Piped Water Supply Scheme for 11 nos. Mouzas under Galsi-I Block , SM/18679 New Execution and payment of wayleave permission with railway services for crossing of portable water supply PWSSat Khano under Khano PWSS under DWSD,PHE Dte Assistant Engineer-I JUNIOR ENGINEER-2 ORD/000011/2025-2026 657/DWSD 21/04/2025 15 MANASH GHOSH 7.09 0.00 0 0
5108 PURBA BARDHAMAN Ausgram - II Burdwan Division BAKSIBAD POGRAM PIPED WATER SUPPLY SCHEME , SM/18408 New Material Requisition To Resource Division RTOR000223/2023-2024 2155/BWD 10/05/2023 Resource Division 20.29 0.00 0 0
5109 PURBA BARDHAMAN Ausgram - II Burdwan Division BAKSIBAD POGRAM PIPED WATER SUPPLY SCHEME , SM/18408 New Material Requisition To Resource Division RTOR000418/2023-2024 3864/BWD 01/09/2023 Resource Division 128.72 0.00 0 0
5110 PURBA BARDHAMAN Ausgram - II Burdwan Division BAKSIBAD POGRAM PIPED WATER SUPPLY SCHEME , SM/18408 New Material Requisition To Resource Division RTOR000644/2023-2024 5110/BWD 23/11/2023 Resource Division 22.15 0.00 0 0
5111 PURBA BARDHAMAN Ausgram - II Central Mechanical BAKSIBAD POGRAM PIPED WATER SUPPLY SCHEME , SM/18408 New NEW SERVICE CONNECTION FOR BAKSIBAD PWSS PH-1. BILL/03140/2023-2024 BP-2023-24-652 20/03/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 12.55 0.00 0 0
5112 PURBA BARDHAMAN Ausgram - II Central Mechanical BAKSIBAD POGRAM PIPED WATER SUPPLY SCHEME , SM/18408 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Chora, Kalaijhuti & others water supply scheme under Ausgram-2 Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. Driller In-Charge JUNIOR ENGINEER ORD/000143/2024-2025 2405/CMD 02/08/2024 90 NABAUDYOG ELECTRICAL ENGINEERING CO-OPERATIVE SOCIETY LTD 95.26 0.00 0 0
5113 PURBA BARDHAMAN Ausgram - II Central Mechanical BAKSIBAD POGRAM PIPED WATER SUPPLY SCHEME , SM/18408 New Quotation for new service connection at Baksibad PWSS TW-2. BILL/01191/2024-2025 BP-2024-25-412 11/12/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.75 0.00 0 0
5114 PURBA BARDHAMAN Ausgram - II Central Mechanical BAKSIBAD POGRAM PIPED WATER SUPPLY SCHEME , SM/18408 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at Baksibad Pogram Water Supply Scheme [ Block- Ausgram-2 ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. Driller In-Charge JUNIOR ENGINEER ORD/000742/2023-2024 4052/CMD 29/08/2023 553 JAGANNATH ENTERPRISE 29.61 0.00 0 80
5115 PURBA BARDHAMAN Ausgram - II Durgapur W/S Division BAKSIBAD POGRAM PIPED WATER SUPPLY SCHEME , SM/18408 New FORMAL WORK ORDER FOR Balance work for construction of boundary wall, dismantling concrete road including mending work, construction of approach road by fillup stone dust, bolders on low load at OHR site and etc allied works under Bakshibad PWSS, Ausgram-II Block under DURGAPUR W/S DIVISION,PHE DTE. Assistant Engineer-II JUNIOR ENGINEER-1 ORD/000264/2024-2025 256/DWSD 11/02/2025 90 M/S. UNIT CONSTRUCTION 122.59 0.00 0 95
5116 PURBA BARDHAMAN Ausgram - II Burdwan Division BAKSIBAD POGRAM PIPED WATER SUPPLY SCHEME , SM/18408 New BAKSIBAD POGRAM Piped Water Supply Scheme with sinking of Tube-well, LDS, Rising Main, FHTC, Construction of 600 cum capacity RCC OHR with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drain and internal pathway at different TW site under Ausgram-II Block, District:- Purba-Bardhaman [NEW SCHEME]_2ND CALL ORD/000484/2023-2024 3504/BWD 10/08/2023 813 M/S PIONEER CONSTRUCTION 691.24 0.00 0 40
5117 PURBA BARDHAMAN Burdwan - II Burdwan Division HATSIMUL PIPED WATER SUPPLY SCHEME , SM/18409 New Material Requisition To Resource Division RTOR000277/2023-2024 2197/BWD 12/05/2023 Resource Division 2.25 0.00 0 0
5118 PURBA BARDHAMAN Burdwan - II Burdwan Division HATSIMUL PIPED WATER SUPPLY SCHEME , SM/18409 New Material Requisition To Resource Division RTOR000441/2023-2024 3846/BWD 01/09/2023 Resource Division 17.48 0.00 0 0
5119 PURBA BARDHAMAN Burdwan - II Burdwan Division HATSIMUL PIPED WATER SUPPLY SCHEME , SM/18409 New Material Requisition To Resource Division RTOR000671/2023-2024 5076/BWD 23/11/2023 Resource Division 20.46 0.00 0 0
5120 PURBA BARDHAMAN Burdwan - II Central Mechanical HATSIMUL PIPED WATER SUPPLY SCHEME , SM/18409 New Electric quotation for New Service Connection at Hatsimul W/S Scehem PH-I. BILL/01771/2023-2024 BP-2023-24-29 26/12/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 4.13 0.00 0 0
5121 PURBA BARDHAMAN Burdwan - II Central Mechanical HATSIMUL PIPED WATER SUPPLY SCHEME , SM/18409 New Electric quotation for New Service Connection at Hatsimul W/S Scehem PH-II. BILL/01772/2023-2024 BP-2023-24-293 26/12/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 5.12 0.00 0 0
5122 PURBA BARDHAMAN Burdwan - II Central Mechanical HATSIMUL PIPED WATER SUPPLY SCHEME , SM/18409 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at KUSHA & others water supply scheme under Bardhaman-II Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman ASSISTANT ENGINEER Junior Engineer ORD/000065/2024-2025 2389/CMD 02/08/2024 90 DILIP MAHATO 53.14 0.00 0 0
5123 PURBA BARDHAMAN Burdwan - II Central Mechanical HATSIMUL PIPED WATER SUPPLY SCHEME , SM/18409 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at Hatsimul Water Supply Scheme [ Block- Burdwan-2 ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER Junior Engineer ORD/000671/2023-2024 4009?CMD 29/08/2023 30 WEST BENGAL ENGINEERING CO. 28.96 0.00 0 95
5124 PURBA BARDHAMAN Burdwan - II Burdwan Division HATSIMUL PIPED WATER SUPPLY SCHEME , SM/18409 New Material Requisition To Resource Division RTOR000021/2024-2025 303/BWD 15/01/2025 Resource Division 13.33 0.00 0 0
5125 PURBA BARDHAMAN Burdwan - II Burdwan Division HATSIMUL PIPED WATER SUPPLY SCHEME , SM/18409 New Different works related (sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of different capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site) to ICHALABAD & HATSIMUL Piped Water Supply Scheme under Burdwan ¿ II Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. Junior Engineer, Burdwan Sadar Sub-Division ORD/000423/2023-2024 3292/BWD 31/07/2023 365 M/S NATIONAL CONSTRUCTION 1,617.18 65.01 4.02 25
5126 PURBA BARDHAMAN Burdwan - II Burdwan Division HATSIMUL PIPED WATER SUPPLY SCHEME , SM/18409 New Different Types of work involved in connection with different Augmentation & New Schemes (11 Nos.) Piped Water Supply Scheme under Burdwan II Block within Burdwan Sub-Div., under Burdwan Division PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/001349/2024-2025 1060/BWD 25/03/2025 120 R.G. INFRASTRUCTURE 262.23 0.00 0 0
5127 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Natu Piped Water Supply Scheme , SM/06972 Retrofitting Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Natu village of Natu piped water supply scheme within Headquarters under Burdwan Division, PHE Dte. [Phase-I](Tr No.-162/BWD/2020-21) ORD/000080/2020-2021 2687/BWD 07/08/2020 30 SINGHA ROY AND CO. 4.92 4.92 100 1
5128 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Natu Piped Water Supply Scheme , SM/06972 Retrofitting Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Haripur village of Natu piped water supply scheme within Headquarters under Burdwan Division, PHE Dte. [Phase-I](Tr No.-161/BWD/2020-21) ORD/000081/2020-2021 2688/BWD 07/08/2020 30 MITRA CONSTRUCTION 4.92 4.92 100 1
5129 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Natu Piped Water Supply Scheme , SM/06972 Retrofitting Continuation work order for Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Haripur village of Natu piped water supply scheme within Headquarters under Burdwan Division, PHE Dte. [Phase-I](Tr No.-278/BWD/2020-21) Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000295/2020-2021 3365/BWD 21/09/2020 30 MITRA CONSTRUCTION 4.92 4.92 100 1
5130 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Natu Piped Water Supply Scheme , SM/06972 Retrofitting Continuation work order for Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Natu village of Natu piped water supply scheme within Headquarters under Burdwan Division, PHE Dte. [Phase-I](Tr No.-276/BWD/2020-21) Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000297/2020-2021 3363/BWD 21/09/2020 30 SINGHA ROY AND CO. 4.46 4.46 100 1
5131 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Natu Piped Water Supply Scheme , SM/06972 Retrofitting Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of Natu Piped Water Supply Scheme at Notu (2 Nos Habitation Part), Horipur (4 Nos Habitation Part), Uttar Mohanpur Village (Mouza), Raina-I Block under Burdwan Division, PHE Dte.(Agreement No. 49/2020-2021 OF SE/CC/PHE. DTE.) Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000126/2020-2021 4767/BWD 01/12/2020 90 SINGHA ROY AND CO. 57.87 27.02 46.69 1
5132 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Natu Piped Water Supply Scheme , SM/06972 Retrofitting Supply of SS316 grade flow control valve for FHTC at different water supply schemes within Kalna Sub-Division under Burdwan Division, PHE Dte. and delivered at Barsul Divisional store.[Part-2] Assistant Engineer ORD/001307/2020-2021 1792 /BWD 26/02/2021 10 INDIA PIPE FITTING CO 9.70 0.00 0 1
5133 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Natu Piped Water Supply Scheme , SM/06972 Retrofitting Providing leftout water tap connection in different villages for 100% coverage to make it Sajal Gram from existing distribution system within scheme jurisdiction of different Piped Water Supply Schemes within Raina ¿ I Block under Burdwan Division, PHE. Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000344/2021-2022 39/BWD 05/01/2022 30 HAFIJUR RAHAMAN MIDYA 15.62 0.00 0 1
5134 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Natu Piped Water Supply Scheme , SM/06972 Retrofitting Extension of 75 mm dia pipeline at Miya Para, Modhya Bohar & Bhagar Para Purba Bohar regarding FHTC under Satgachia (Zone-I) water supply scheme under Burdwan Division, PHE Dte.[Gr.-A] Assistant Engineer ,Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000350/2021-2022 703/BSD 11/06/2021 5 M/S SAYAN CHAKRABORTY 0.88 0.81 92.05 1
5135 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Natu Piped Water Supply Scheme , SM/06972 Retrofitting Construction of 350 m3 capacity 20 mtr. staging height RCC over head reservoir including pipe connection and cost of pipes, specials for Natu & its adjoining mouzas water supply scheme under Burdwan Division, P.H.E. Dte. (Tr. No.-28/SE/CC/15-16) ORD/000410/2015-2016 5285/B 23/02/2016 SINGHA ROY AND CO. 113.87 0.00 0 0
5136 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Natu Piped Water Supply Scheme , SM/06972 Retrofitting Laying Parallel Pipeline to improve drinking water supply, Construction of Boundary wall, Path Way, Drain at Head Work Site and providing leftout FHTC, Road Restoration with allied work for NATU Piped Water Supply Scheme, Block-Raina-I within Burdwan Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000373/2024-2025 2994/BWD 01/08/2024 90 ANWESHA CONSTRUCTION 55.19 0.00 0 0
5137 PURBA BARDHAMAN Burdwan Division Rretrofitting wroks for Providing Functional Household Tap Connection (FHTC) within the commend area of RASULPUR Piped Water Supply Scheme , SM/08031 Retrofitting Providing FHTC from dist. System within the command area of RASULPUR Piped Water Supply Scheme at Genraghata, Paschim Tazpur, Ulara, Daluibazar of Daluibazar - I G.P. and different samsad such as Samsad No. 05, 13, 08, 12, 09, 10, 11, 15 & 14 within Nimo-I G.P. at Memari-I Development Block under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000612/2021-2022 1572/BWD 16/03/2022 60 SUJAY KUMAR RAY 55.17 41.89 75.93 1
5138 PURBA BARDHAMAN Burdwan Division Rretrofitting wroks for Providing Functional Household Tap Connection (FHTC) within the commend area of RASULPUR Piped Water Supply Scheme , SM/08031 Retrofitting Emergency repair and provide 5 (5 nos 100 dia. S.V) No's Sluice Valve at Chaknara & Ullara village under Rasulpur piped water supply scheme (Retro Fittings) for smooth drinking water supply within Memari-I Block under Burdwan Division, PHE Dte (Part-B). Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. Junior Engineer, RWS, Memari-I Dev. Bolck ORD/000578/2022-2023 1972/BSD 16/11/2022 15 SUPRIYA RAY 0.90 0.00 0 0
5139 PURBA BARDHAMAN Burdwan Division Rretrofitting wroks for Providing Functional Household Tap Connection (FHTC) within the commend area of RASULPUR Piped Water Supply Scheme , SM/08031 Retrofitting Construction of Balance portion of Boundary wall at Head Works Site of RASULPUR Water Supply scheme under MEMARI-I Block of Burdwan Division, PHE Dte. (Length -15.00 Mtr, Col-7 Nos). Gr.E. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000443/2022-2023 1481/BSD 25/08/2022 30 DEBASHISH ENTERPRISE 1.95 1.51 77.44 100
5140 PURBA BARDHAMAN Burdwan Division Rretrofitting wroks for Providing Functional Household Tap Connection (FHTC) within the commend area of RASULPUR Piped Water Supply Scheme , SM/08031 Retrofitting Material Requisition To Resource Division RTOR000021/2021-2022 425/BWD 20/01/2022 Resource Division 5.50 0.00 0 0
5141 PURBA BARDHAMAN Burdwan Division Rretrofitting wroks for Providing Functional Household Tap Connection (FHTC) within the commend area of RASULPUR Piped Water Supply Scheme , SM/08031 Retrofitting Formal Work Order for Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of Rasulpur Piped Water Supply Scheme at Chaknara, Rasulpur (4 Nos Habitation Part) Daluibazar (Part) Village (Mouza), Memari-I Block under Burdwan Division, PHE Dte..[Agreement No. 103/SE/CC/PHE/Dte of 2020-2021.] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000600/2020-2021 997/BWD 04/02/2021 60 MITRA CONSTRUCTION 95.96 94.67 98.66 0
5142 PURBA BARDHAMAN Burdwan Division Rretrofitting wroks for Providing Functional Household Tap Connection (FHTC) within the commend area of RASULPUR Piped Water Supply Scheme , SM/08031 Retrofitting Formal Work Order for Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of Rasulpur Piped Water Supply Scheme at Jitkanu, Genraghata, Paschim Tazpur, Ulara (2 Nos Habitation) & Baidyadanga Village (Mouza), Memari-I Block under Burdwan Division, PHE Dte.(Agreement No. 104/SE/CC/PHE/DTE of 2020-2021) Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000578/2020-2021 996/BWD 04/02/2021 60 MITRA CONSTRUCTION 93.49 38.08 40.73 0
5143 PURBA BARDHAMAN Burdwan Division Rretrofitting wroks for Providing Functional Household Tap Connection (FHTC) within the commend area of RASULPUR Piped Water Supply Scheme , SM/08031 Retrofitting Restoration of damaged portion of 75 mm dia & 125 mm dia UPVC pipeline due to widening of GT Road by from Palla Road more to Mahamaya Store at RASULPUR water supply scheme within Burdwan Sub-Division under Burdwan Division, PHE Dte. [Gr.-C] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000783/2020-2021 19/BSD 06/01/2021 30 PAL CONSTRUCTION 4.79 4.25 88.73 0
5144 PURBA BARDHAMAN Burdwan Division Rretrofitting wroks for Providing Functional Household Tap Connection (FHTC) within the commend area of RASULPUR Piped Water Supply Scheme , SM/08031 Retrofitting Emergency repair and provided (4 nos.100 dia S.V) No's Sluice Valve at Rasulpur Natun Rasta,Nichu Bazar of RASULPUR Piped Water Supply Scheme (Retrofittings) for smooth drinking water supply within within Memari-I Block under Burdwan Division, PHE Dte. Gr.D Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000564/2022-2023 1920/BSD 11/11/2022 15 SUPRIYA RAY 0.73 0.00 0 100
5145 PURBA BARDHAMAN Burdwan Division Rretrofitting wroks for Providing Functional Household Tap Connection (FHTC) within the commend area of RASULPUR Piped Water Supply Scheme , SM/08031 Retrofitting Restoration of concrete road by Cement concrete (mix 1:1.5:3), Providing balance FHTC, parallel pipeline, drainage system, boundary wall, Bridge, land development, Sluice valve chamber for smooth water supply of FHTC work for RASULPUR PWSS and its adjoining mouzas within MEMARI-I BLOCK under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000982/2024-2025 4474/BWD 19/12/2024 90 SARKAR AGENCY 91.74 0.00 0 0
5146 PURBA BARDHAMAN Burdwan Division Rretrofitting wroks for Providing Functional Household Tap Connection (FHTC) within the commend area of MANKAR Piped Water Supply Scheme Block-Galsi-I , SM/08034 Retrofitting Providing Functional House Hold Tap connection (FHTC) from existing distribution system within the command area of MANKAR piped water supply scheme at Budbud (Part) village Budbud (Part) habitation (Mouza), Galsi-I Block under Burdwan Division, PHE Dte. Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000707/2020-2021 547/BWD 22/01/2021 30 SAIKAT RAY 22.24 22.23 99.96 1
5147 PURBA BARDHAMAN Burdwan Division Rretrofitting wroks for Providing Functional Household Tap Connection (FHTC) within the commend area of MANKAR Piped Water Supply Scheme Block-Galsi-I , SM/08034 Retrofitting Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of Mankar Piped Water Supply Scheme at Bagabanpur (Part), Budbud (Part) & Mallikpur (Part) Village (Mouza) under Burwan Division, PHE Dte. Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000098/2021-2022 3372/BWD 23/06/2021 60 SAMRAT REALPROJECTS PRIVATE LIMITED 79.30 59.21 74.67 1
5148 PURBA BARDHAMAN Burdwan Division Rretrofitting wroks for Providing Functional Household Tap Connection (FHTC) within the commend area of MANKAR Piped Water Supply Scheme Block-Galsi-I , SM/08034 Retrofitting Extension of pipeline in connection with FHTC for MANKAR Piped W/S Scheme under Galsi-I Block within Durgapur Sub Division under Burdwan Division, P.H.E. Dte. (Gr.-B) Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000085/2021-2022 446/DSD 14/07/2021 30 N.B. CONSTRUCTION 1.81 1.78 98.34 1
5149 PURBA BARDHAMAN Burdwan Division Rretrofitting wroks for Providing Functional Household Tap Connection (FHTC) within the commend area of MANKAR Piped Water Supply Scheme Block-Galsi-I , SM/08034 Retrofitting Supply of materials for different water supply scheme under Burdwan Division, PHE Dte. VCH/001013/2021-2022 null 21/01/2022 EXECUTIVE ENGINEER, RESOURCES DIVISION, P.H.E. DTE. 617.98 0.00 0 0
5150 PURBA BARDHAMAN Burdwan Division Rretrofitting wroks for Providing Functional Household Tap Connection (FHTC) within the commend area of MANKAR Piped Water Supply Scheme Block-Galsi-I , SM/08034 Retrofitting Payment for supply of materials for different water supply scheme under Burdwan Division, PHE Dte. VCH/001045/2021-2022 934/DW 31/01/2022 EXECUTIVE ENGINEER, RESOURCES DIVISION, P.H.E. DTE. 617.98 0.00 0 0
5151 PURBA BARDHAMAN Burdwan Division Rretrofitting wroks for Providing Functional Household Tap Connection (FHTC) within the commend area of MANKAR Piped Water Supply Scheme Block-Galsi-I , SM/08034 Retrofitting Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of Mankar Piped Water Supply Scheme at Mankar (Part) Village (Mouza) under Burwan Division, PHE Dte. Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000097/2021-2022 3591/BWD 13/07/2021 60 SAMRAT REALPROJECTS PRIVATE LIMITED 140.03 73.57 52.54 1
5152 PURBA BARDHAMAN Burdwan Division Rretrofitting wroks for Providing Functional Household Tap Connection (FHTC) within the commend area of MANKAR Piped Water Supply Scheme Block-Galsi-I , SM/08034 Retrofitting Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of Mankar Piped Water Supply Scheme at Sukdal Village (Mouza) 5 nos Habitation under Burwan Division, PHE Dte. Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000110/2021-2022 3878/BWD 27/07/2021 60 SUJAY KUMAR RAY 151.77 107.68 70.95 1
5153 PURBA BARDHAMAN Burdwan Division Rretrofitting wroks for Providing Functional Household Tap Connection (FHTC) within the commend area of MANKAR Piped Water Supply Scheme Block-Galsi-I , SM/08034 Retrofitting Retrofitting of RCC Elevated Reservoir (Capacity 450 Cum) by Shortcreting, Guniting etc. in connection with Augmentation of Mankar W/S. Scheme (Zone - I) under Burdwan Division, PHE. Dte. Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000835/2021-2022 6043/BWD 07/10/2021 45 SUDIPTO GORAIN 19.85 19.85 100 1
5154 PURBA BARDHAMAN Burdwan Division Rretrofitting wroks for Providing Functional Household Tap Connection (FHTC) within the commend area of MANKAR Piped Water Supply Scheme Block-Galsi-I , SM/08034 Retrofitting Restoration of village Road dismantled by laying pipeline for providing FHTC at SUKDAL Village, near Sukdal Petrol and near Hindi School under Mankar (Zone-I) Piped Water Supply Scheme under Galsi-I Block within Durgapur (Burdwan North) Sub Division under Burdwan Division, P.H.E. Dte._2nd call SL-04 Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer1, Durgapur Sub-Division, PHE Dte. ORD/000530/2022-2023 649/DSD 03/11/2022 21 PRATIVA CONSTRUCTION 4.72 4.67 98.94 1
5155 PURBA BARDHAMAN Burdwan Division Rretrofitting wroks for Providing Functional Household Tap Connection (FHTC) within the commend area of MANKAR Piped Water Supply Scheme Block-Galsi-I , SM/08034 Retrofitting Replacement of damage A.C. Pipeline at Mankar Bhattacharya Para & New royel club to Battala under Mankar(Zone-II) Piped Water Supply Scheme under Galsi-I Block within Durgapur (Burdwan North) Sub Division under Burdwan Division, P.H.E. Dte. SL-06 Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer1, Durgapur Sub-Division, PHE Dte. ORD/000532/2022-2023 651/DSD 03/11/2022 30 OM ENTERPRISE 4.72 4.68 99.15 1
5156 PURBA BARDHAMAN Burdwan Division Rretrofitting wroks for Providing Functional Household Tap Connection (FHTC) within the commend area of MANKAR Piped Water Supply Scheme Block-Galsi-I , SM/08034 Retrofitting Restoration of village Road dismantled by laying pipeline for providing FHTC Budbud Village, Girls School Para, Sukanta Nagar etc. under Mankar (Zone-I) Piped Water Supply Scheme under Galsi-I Block within Durgapur (Burdwan North) Sub Division under Burdwan Division, P.H.E. Dte. SL-02 Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer1, Durgapur Sub-Division, PHE Dte. ORD/000528/2022-2023 647/DSD 03/11/2022 21 DEY NIRMAN 4.80 4.76 99.17 1
5157 PURBA BARDHAMAN Burdwan Division Rretrofitting wroks for Providing Functional Household Tap Connection (FHTC) within the commend area of MANKAR Piped Water Supply Scheme Block-Galsi-I , SM/08034 Retrofitting Replacement of damage A.C. Pipeline Mankar Pal Para & Nayakpara under Mankar(Zone-II) Piped Water Supply Scheme under Galsi-I Block within Durgapur (Burdwan North) Sub Division under Burdwan Division, P.H.E. Dte. SL-07 Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer1, Durgapur Sub-Division, PHE Dte. ORD/000533/2022-2023 652/DSD 03/11/2022 30 SOUMYAVASH DAS 4.55 4.41 96.92 1
5158 PURBA BARDHAMAN Burdwan Division Rretrofitting wroks for Providing Functional Household Tap Connection (FHTC) within the commend area of MANKAR Piped Water Supply Scheme Block-Galsi-I , SM/08034 Retrofitting Restoration of village Road dismantled by laying pipeline for providing FHTC near north side of Budbub Canal par colony under Mankar (Zone-I) Piped Water Supply Scheme under Galsi-I Block within Durgapur (Burdwan North) Sub Division under Burdwan Division, P.H.E. Dte. SL-01 Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer1, Durgapur Sub-Division, PHE Dte. ORD/000527/2022-2023 646/DSD 03/11/2022 21 ROY CONSTRUCTION 4.79 4.65 97.08 1
5159 PURBA BARDHAMAN Burdwan Division Rretrofitting wroks for Providing Functional Household Tap Connection (FHTC) within the commend area of MANKAR Piped Water Supply Scheme Block-Galsi-I , SM/08034 Retrofitting Providing functional household tap connection (FHTC) from existing distribution system within the command area of Mankar piped water supply scheme at Budbud (Part), Budbud habitation, Malikpara village (Malikpara habitation) & Bagabanpur village (Bagabanpur habitation), Galsi-I Block under Burdwan Division, PHE Dte. Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000518/2020-2021 308/BWD 14/01/2021 30 RELIABLE ENGINEERS CO.-OPERATIVE CONSTRUCTION SOCIETY LTD. 21.83 11.63 53.28 1
5160 PURBA BARDHAMAN Burdwan Division Rretrofitting wroks for Providing Functional Household Tap Connection (FHTC) within the commend area of MANKAR Piped Water Supply Scheme Block-Galsi-I , SM/08034 Retrofitting Replacement of damage A.C. Pipeline from Mankar Dani Pukur to Purbasa colony via Post Office & Annapurnatala to Panchakalitala under Mankar (Zone-II) Piped Water Supply Scheme under Galsi-I Block within Durgapur (Burdwan North) Sub Division under Burdwan Division, P.H.E. Dte._2ND CALL. Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000242/2021-2022 6633/BWD 29/11/2021 30 PREMANANDA ROY BISWAS 11.43 11.26 98.51 1
5161 PURBA BARDHAMAN Burdwan Division Rretrofitting wroks for Providing Functional Household Tap Connection (FHTC) within the commend area of MANKAR Piped Water Supply Scheme Block-Galsi-I , SM/08034 Retrofitting Dismantling of encroachments within Head work site of Mankar (Zone-II) Pipe Water Supply Scheme, at Galsi-I Block within Durgapur(Bardhaman North) Sub-Division under Burdwan Division, PHE Dte. [SL-A] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000545/2021-2022 130/DSD 02/03/2022 3 PARTHA RAY 0.19 0.00 0 1
5162 PURBA BARDHAMAN Burdwan Division Rretrofitting wroks for Providing Functional Household Tap Connection (FHTC) within the commend area of MANKAR Piped Water Supply Scheme Block-Galsi-I , SM/08034 Retrofitting Laying of pipe line at North side Canal Bank for construction of diversion road by PWD Dept. under Mankar(Zone-II) Piped Water Supply Scheme under Galsi-I Block within Durgapur (Burdwan North) Sub Division under Burdwan Division, P.H.E. Dte.[SL-F] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000627/2021-2022 167/DSD 16/03/2022 30 N.B. CONSTRUCTION 0.65 0.00 0 1
5163 PURBA BARDHAMAN Burdwan Division Rretrofitting wroks for Providing Functional Household Tap Connection (FHTC) within the commend area of MANKAR Piped Water Supply Scheme Block-Galsi-I , SM/08034 Retrofitting Replacement of damage UPVC Pipeline at Mankar Masjit Tala under Mankar (Zone-II) Piped Water Supply Scheme under Galsi-I Block within Durgapur (Burdwan North) Sub Division under Burdwan Division, P.H.E. Dte. [Gr.-F] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000266/2021-2022 693/DSD 08/12/2021 21 SURATH DEY 1.47 1.37 93.2 1
5164 PURBA BARDHAMAN Burdwan Division Rretrofitting wroks for Providing Functional Household Tap Connection (FHTC) within the commend area of MANKAR Piped Water Supply Scheme Block-Galsi-I , SM/08034 Retrofitting Replacement of damaged AC pipeline at Raipur under Mankar (Zone-II) piped water supply scheme within Galsi-I Block within Durgapur (Burdwan North) Sub Division under Burdwan Division, P.H.E. Dte.[SL-06] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000060/2023-2024 182/DSD 18/04/2023 21 MONDAL CONSTRUCTION 0.97 0.00 0 0
5165 PURBA BARDHAMAN Burdwan Division Rretrofitting wroks for Providing Functional Household Tap Connection (FHTC) within the commend area of MANKAR Piped Water Supply Scheme Block-Galsi-I , SM/08034 Retrofitting Modification to Rising main and D.I. distribution to ensure more controll of water supply of MANKAR water Supply Scheme under Durgapur (Burdwan North) Sub-Division in Galsi-I Block under Burdwan Division, P.H.E. Dte. [SL-E] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000118/2022-2023 336/DSD 27/06/2022 21 SHUBHRA KANTI GHOSH 2.82 2.67 94.68 1
5166 PURBA BARDHAMAN Burdwan Division Rretrofitting wroks for Providing Functional Household Tap Connection (FHTC) within the commend area of MANKAR Piped Water Supply Scheme Block-Galsi-I , SM/08034 Retrofitting Connection from newly Retrofitted Over Head Reservoir to Distribution System & Rising main Pipe Line of MANKAR (Zone-I) Water Supply Scheme under Galsi-I Block under within Durgapur Sub Division PHE Dte. Under Burdwan Division PHE Dte. [Gr.-D] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000272/2022-2023 497/DSD 12/08/2022 30 SHUBHRA KANTI GHOSH 4.77 4.52 94.76 1
5167 PURBA BARDHAMAN Burdwan Division Rretrofitting wroks for Providing Functional Household Tap Connection (FHTC) within the commend area of MANKAR Piped Water Supply Scheme Block-Galsi-I , SM/08034 Retrofitting Crossing of Mankar-Guskara Bolgona Road at Head works site of Mankar (Z-I) W/S Scheme for laying distribution and rising main through pushing of 750mm.dia. RCC casing pipe by hydraulic jacking method for Mankar (Z-I) W/S Scheme under Durgapur (Bardhaman North) Sub Division, Burdwan Division, PHE Dte.[SL-12] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer1, Durgapur Sub-Division, PHE Dte. ORD/000855/2022-2023 712/DSD 30/12/2022 30 SHUBHRA KANTI GHOSH 4.74 4.63 97.68 100
5168 PURBA BARDHAMAN Burdwan Division Rretrofitting wroks for Providing Functional Household Tap Connection (FHTC) within the commend area of MANKAR Piped Water Supply Scheme Block-Galsi-I , SM/08034 Retrofitting Ground development, vertical extension of valve chamber, construction of pathway, drain etc. at Head work site of Mankar (Z-II) water supply scheme, Block-Galsi-I under Durgapur (Bardhaman North)Sub-Division under Burdwan Division, PHE Dte. SL-05 Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer1, Durgapur Sub-Division, PHE Dte. ORD/000531/2022-2023 650/DSD 03/11/2022 30 SAIKAT RAY 3.42 2.98 87.13 100
5169 PURBA BARDHAMAN Burdwan Division Rretrofitting wroks for Providing Functional Household Tap Connection (FHTC) within the commend area of MANKAR Piped Water Supply Scheme Block-Galsi-I , SM/08034 Retrofitting Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of Augmentation of MANKAR Piped Water Supply Scheme at Mankar Palpara, Galsi-I Block within Durgapur (Burdwan North) Sub Division under Burdwan Division, P.H.E. Dte. [SL-05] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000025/2023-2024 153/DSD 13/04/2023 21 SOUMYAVASH DAS 0.95 0.93 97.89 100
5170 PURBA BARDHAMAN Burdwan Division Rretrofitting wroks for Providing Functional Household Tap Connection (FHTC) within the commend area of MANKAR Piped Water Supply Scheme Block-Galsi-I , SM/08034 Retrofitting Providing Functional Household Tap Connection (FHTC) from existing distribution system with within the command area of Augmentation of MANKAR Piped Water Supply Scheme at Mankar Nayekpara, Galsi-I Block within Durgapur (Burdwan North) Sub Division under Burdwan Division, P.H.E. Dte.[SL-02] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000053/2023-2024 177/DSD 18/04/2023 21 SOUMYAVASH DAS 0.96 0.94 97.92 100
5171 PURBA BARDHAMAN Burdwan Division Rretrofitting wroks for Providing Functional Household Tap Connection (FHTC) within the commend area of MANKAR Piped Water Supply Scheme Block-Galsi-I , SM/08034 Retrofitting Extension of Pipeline for Providing Functional Household Tap Connection (FHTC) within the command area of Augmentation of MANKAR Piped Water Supply Scheme at back side of Mankar Girls School, Galsi-I Block within Durgapur (Burdwan North) Sub Division under Burdwan Division, P.H.E. Dte.[SL-04] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000056/2023-2024 179/DSD 18/04/2023 21 SHUBHRA KANTI GHOSH 0.96 0.94 97.92 100
5172 PURBA BARDHAMAN Burdwan Division Rretrofitting wroks for Providing Functional Household Tap Connection (FHTC) within the commend area of MANKAR Piped Water Supply Scheme Block-Galsi-I , SM/08034 Retrofitting Extension of Pipeline for Providing Functional Household Tap Connection (FHTC) within the command area of Augmentation of MANKAR Piped Water Supply Scheme Near Mankar Masjitala, Galsi-I Block within Durgapur (Burdwan North) Sub Division under Burdwan Division, P.H.E. Dte.[SL-03] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000055/2023-2024 178/DSD 18/04/2023 21 SOUMYAVASH DAS 0.96 0.94 97.92 100
5173 PURBA BARDHAMAN Burdwan Division Rretrofitting wroks for Providing Functional Household Tap Connection (FHTC) within the commend area of MANKAR Piped Water Supply Scheme Block-Galsi-I , SM/08034 Retrofitting Shifting of 300 MM dia D.I. pipe and laying of 12 mtr 150 mm dia D.I.pipe for widening of NH2 at Budbud more and supply of 80 mm dia Sluice valve and construction of valve chamber of Mankar Water supply scheme within Galsi -I Block,under Durgapur Sub Division,PHE Dte. Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer ORD/000578/2023-2024 658/DSD 24/08/2023 15 SHANKHA GHOSH 0.96 0.96 100 100
5174 PURBA BARDHAMAN Burdwan Division Rretrofitting wroks for Providing Functional Household Tap Connection (FHTC) within the commend area of MANKAR Piped Water Supply Scheme Block-Galsi-I , SM/08034 Retrofitting Providing Functional Household Tap Connection (FHTC) from existing distribution system with within the command area of Augmentation of MANKAR Piped Water Supply Scheme at backside of Mankar Girls School, Galsi-I Block within Durgapur (Burdwan North) Sub Division under Burdwan Division, P.H.E. Dte.[SL-01] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000052/2023-2024 176/DSD 18/04/2023 21 SHUBHRA KANTI GHOSH 0.95 0.94 98.95 95
5175 PURBA BARDHAMAN Burdwan Division Rretrofitting wroks for Providing Functional Household Tap Connection (FHTC) within the commend area of MANKAR Piped Water Supply Scheme Block-Galsi-I , SM/08034 Retrofitting Laying of hume pipe 600 MM dia and laying of 48 mtr 315 mm dia HDPE pipe for widening of NH2 crossing at Budbud more fly over of Mankar Water supply scheme within Galsi -I Block,under Durgapur Sub Division,PHE Dte. ORD/000987/2023-2024 43/DSD 17/01/2024 60 SOUMYAVASH DAS 4.77 0.00 0 100
5176 PURBA BARDHAMAN Burdwan Division Rretrofitting wroks for Providing Functional Household Tap Connection (FHTC) within the commend area of MANKAR Piped Water Supply Scheme Block-Galsi-I , SM/08034 Retrofitting Laying of new 300 & 200 mm dia sluice valve with valve chamber and replacement of 200 & 150 mm dia sluice valve with valve chamber at Budbud bazar and near NH2 and sukdal within Durgapur Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer1, Durgapur Sub-Division, PHE Dte. ORD/000568/2023-2024 657/DSD 24/08/2023 15 SOUMYAVASH DAS 0.96 0.00 0 100
5177 PURBA BARDHAMAN Durgapur W/S Division Rretrofitting wroks for Providing Functional Household Tap Connection (FHTC) within the commend area of MANKAR Piped Water Supply Scheme Block-Galsi-I , SM/08034 Retrofitting Formal Work Order for Sinking of 300 x 200 mm x 150mtr depth by DR Rig, Construction of 01 (One) no 5.25 x 3.25 m Pump House cum Chlorine room with sanitary arrangement, Boundary wall, including laying UPVC distribution system (LDS) and Providing FHTC and other allied works at Mankar under Retrofitting of Mankar PWSS, Block- Galsi-I, Dist- Purba Bardhaman under Durgapur W/S Division, PHE Dte. (Zone-I/Part-B) Assistant Engineer-II Contractual Junior Engineer_1 ORD/000122/2024-2025 1114/DWSD 02/08/2024 120 MANASH GHOSH 163.89 0.00 0 0
5178 PURBA BARDHAMAN Burdwan Division Rretrofitting wroks for Providing Functional Household Tap Connection (FHTC) within the commend area of MANKAR Piped Water Supply Scheme Block-Galsi-I , SM/08034 Retrofitting Laying Parallel pipeline from Mankar Hattala to Bhattacharya para & restore to damage pipeline at difference location of Mallickpara for water supply smoothly of MANKAR (Z-II) and its adjoining mouza's Piped W/S Scheme at Galsi-I Block within Durgapur Sub Division under Burdwan Division, P.H.E. Dte. ORD/000804/2023-2024 4819/BWD 08/11/2023 60 SHUBHRA KANTI GHOSH 24.08 0.00 0 100
5179 PURBA BARDHAMAN Durgapur W/S Division Rretrofitting wroks for Providing Functional Household Tap Connection (FHTC) within the commend area of MANKAR Piped Water Supply Scheme Block-Galsi-I , SM/08034 Retrofitting Acceptance cum Formal Work Order for Drain Constriction & Repairing works For Mankar Water Supply Scheme (Zone-II) at Nayak Para, Dist:- Purba Bardhaman under DWSD, PHE Dte. Assistant Engineer-II Contractual Junior Engineer_1 ORD/000129/2024-2025 1211/DWSD 23/08/2024 10 SOUMYAVASH DAS 0.66 0.00 0 100
5180 PURBA BARDHAMAN Durgapur W/S Division Rretrofitting wroks for Providing Functional Household Tap Connection (FHTC) within the commend area of MANKAR Piped Water Supply Scheme Block-Galsi-I , SM/08034 Retrofitting Acceptance cum Formal Work Order for the work of Balance work for Distribution System and Rising Main Pipeline (UPVC/HDPE), Construction of different dia Sluice valve /Air valve/Washout chamber in different sizes,Concrete road renovation for MANKAR (ZONE-I) Water Supply Schemes of GALSI-I Block under Durgapur Water Supply Division, PHE Dte. Assistant Engineer-II Contractual Junior Engineer_1 ORD/000051/2024-2025 766/DWSD 06/06/2024 25 SOUMYAVASH DAS 1.40 0.00 0 100
5181 PURBA BARDHAMAN Durgapur W/S Division Rretrofitting wroks for Providing Functional Household Tap Connection (FHTC) within the commend area of MANKAR Piped Water Supply Scheme Block-Galsi-I , SM/08034 Retrofitting Acceptance cum Formal Work Order for the work of Balance Work for Distribution System and Rising Main Pipeline (CV/DVAC/UPVC), Construction of different dia Sluice valve /Air valve/Washout chamber in different sizes, Concrete Road renovation, Mechanical joints for MANKAR (ZONE-II) Water Supply Schemes of GALSI-I Block under Durgapur Water Supply Division, PHE Dte. Assistant Engineer-II Contractual Junior Engineer_1 ORD/000048/2024-2025 769/DWSD 06/06/2024 25 SHANKHA GHOSH 2.06 0.00 0 100
5182 PURBA BARDHAMAN Durgapur W/S Division Rretrofitting wroks for Providing Functional Household Tap Connection (FHTC) within the commend area of MANKAR Piped Water Supply Scheme Block-Galsi-I , SM/08034 Retrofitting QUOTATION FOR NEW SERVICE CONNECTION AT MANKAR PWSS ZONE-2 T.W-1 UNDER C.M.D, P.H.E Dte. BILL/00263/2024-2025 null 31/12/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.72 0.00 0 null
5183 PURBA BARDHAMAN Durgapur W/S Division Rretrofitting wroks for Providing Functional Household Tap Connection (FHTC) within the commend area of MANKAR Piped Water Supply Scheme Block-Galsi-I , SM/08034 Retrofitting New service connection of Mankar Zone-II PWSS at TW-I BILL/00265/2024-2025 BP-2024-25-117 04/02/2025 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED 3.72 0.00 0 null
5184 PURBA BARDHAMAN Durgapur W/S Division Rretrofitting wroks for Providing Functional Household Tap Connection (FHTC) within the commend area of MANKAR Piped Water Supply Scheme Block-Galsi-I , SM/08034 Retrofitting FORMAL WORK ORDER FOR Sinking of 300 x 200 mm x 150 mtr deapth by DR Rig, Construction of 1 (One) no 5.25 x 3.25 m Pump House cum Chlorine room with sanitary arrangement, Boundary wall including laying UPVC distribution system (LDS) and providing FHTC and other allied works at Mankar under Retrofitting of Mankar PWSS, Block- Galsi-I under DURGAPUR W/S DIVISION, PHE DTE. Assistant Engineer-II Contractual Junior Engineer_1 ORD/000266/2024-2025 260/DWSD 11/02/2025 120 M/S. GOUTAM ROY 105.88 0.00 0 0
5185 PURBA BARDHAMAN Durgapur W/S Division Rretrofitting wroks for Providing Functional Household Tap Connection (FHTC) within the commend area of MANKAR Piped Water Supply Scheme Block-Galsi-I , SM/08034 Retrofitting Acceptance cum formal Work Order for the work of Sinking of 300 x 200mm x 150mtr depth by DR Rig Tube Well , Construction of 01 (One) no 5.25 x 3.25m Pump House cum Chlorine room with sanitary arrangement, Boundary Wall including laying UPVC distribution system (LDS) and Providing FHTC and other allied works at MANKAR under Retrofitting of Mankar PWSS (Zone-II, Part-B) under Galsi-I Block within Durgapur Water Supply Division P.H.E Dte. Assistant Engineer-II Contractual Junior Engineer_1 ORD/000029/2024-2025 757/DWSD 06/06/2024 269 RAMKRISHNA CHAKRABORTY 66.25 0.00 0 60
5186 PURBA BARDHAMAN Durgapur W/S Division Rretrofitting wroks for Providing Functional Household Tap Connection (FHTC) within the commend area of MANKAR Piped Water Supply Scheme Block-Galsi-I , SM/08034 Retrofitting Material Requisition To Resource Division RTOR000027/2024-2025 450/DWSD 17/03/2025 Resource Division 0.28 0.00 0 0
5187 PURBA BARDHAMAN Burdwan Division Rretrofitting wroks for Providing Functional Household Tap Connection (FHTC) within the commend area of MANKAR Piped Water Supply Scheme Block-Galsi-I , SM/08034 Retrofitting Providing leftout water tap connection in different villages for 100% coverage to make it Sajal Gram from existing distribution system within scheme jurisdiction of different Piped Water Supply Schemes within Galsi ¿ I Block under Burdwan Division, PHE. Dte._2ND CALL. Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000673/2021-2022 1738/BWD 28/03/2022 30 JYOTI ENTERPRISE 5.72 0.00 0 100
5188 PURBA BARDHAMAN Durgapur W/S Division Rretrofitting wroks for Providing Functional Household Tap Connection (FHTC) within the commend area of MANKAR Piped Water Supply Scheme Block-Galsi-I , SM/08034 Retrofitting Acceptance cum Formal Work Order for the work of "Sinking of 300 X 200mm x 150mtr depth by DR Rig Tube Wells, Construction of 01 (One) no 5.25 x 3.25m Pump House cum Chlorine Room with sanitary arrangement, Boundary Wall including laying UPVC distribution system (LDS) and providing FHTC and allied works at Mankar under Retrofitting of Mankar PWSS (Zone-II, Part-A), under Galsi-I Block, Dist- Purba Bardhaman under Durgapur W/S Division, PHE Dte. Assistant Engineer-II Contractual Junior Engineer_1 ORD/000044/2024-2025 760/DWSD 06/06/2024 360 G.S CONSTRUCTION AND CO 92.69 0.00 0 10
5189 PURBA BARDHAMAN Central Mechanical Rretrofitting wroks for Providing Functional Household Tap Connection (FHTC) within the commend area of MANKAR Piped Water Supply Scheme Block-Galsi-I , SM/08034 Retrofitting Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1&2 (ZONE:-1&2) at Augmentation MANKAR Water Supply Scheme [ BLOCK- GALSI-I ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. Driller In-Charge JUNIOR ENGINEER ORD/000007/2025-2026 1003/CMD 17/04/2025 60 DAS CONSTRUCTION 51.38 0.00 0 0
5190 PURBA BARDHAMAN Central Mechanical Rretrofitting wroks for Providing Functional Household Tap Connection (FHTC) within the commend area of MANKAR Piped Water Supply Scheme Block-Galsi-I , SM/08034 Retrofitting QUOTATION FOR NEW SERVICE CONNECTION AT MANKAR ZONE-I, T.W-4 UNDER CMD,PHE Dte. BILL/00061/2025-2026 null 21/04/2025 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.35 0.00 0 null
5191 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Bamunpara Piped Water Supply Scheme , SM/06962 Retrofitting Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of Bamunpara Piped Water Supply Scheme at Bamunpara (7 Nos Habitation Part), Sahajadpur (5 Nos Habitation Part), Gulita Daspara & Purba Khanpur (4 Nos Habitation) Village (Mouza), Monteswar Block under Burdwan Division, PHE Dte.(Agreement No. 69/2020-2021 OF SE/CC/PHE. DTE.) Assistant Engineer ORD/000130/2020-2021 5002/BWD 07/12/2020 90 M/S S. CHOUDHURY 50.71 45.69 90.1 1
5192 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Bamunpara Piped Water Supply Scheme , SM/06962 Retrofitting Supply of SS316 grade flow control valve for FHTC at different water supply schemes within Kalna Sub-Division under Burdwan Division, PHE Dte. and delivered at Barsul Divisional store.[Part-2] Assistant Engineer ORD/001307/2020-2021 1792 /BWD 26/02/2021 10 INDIA PIPE FITTING CO 9.70 0.00 0 1
5193 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Bamunpara Piped Water Supply Scheme , SM/06962 Retrofitting Providing FHTC - Sahajadpur (5 nos habitations)-170 nos & Bamunpara (7 nos habitation)-170 nos & Extension of pipeline to provide house connection at Tentulia village & Sahajadpur village for Drain out water of wash out & over flow line from existing OHR at Head Works Site of BAMUNPARA W/S Scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer ORD/000588/2021-2022 1417/BWD 10/03/2022 30 M/S UNIQUE 16.50 16.33 98.97 1
5194 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Bamunpara Piped Water Supply Scheme , SM/06962 Retrofitting Laying of UPVC pipeline & providing FHTC work at Bamunpara, Sahajadpur, Tentulia & Gulita village of BAMUNPARA Water Supply Scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000150/2023-2024 2423/BWD 30/05/2023 30 GOUTAM KUMAR MITRA 9.65 9.40 97.41 100
5195 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Bamunpara Piped Water Supply Scheme , SM/06962 Retrofitting Conducting physical Household Survey at the IMIS reported village for HGJ certification and providing balance FHTC for Har Ghar Jal certification including conducting Gram Sabhas for different IMIS reported villages across the district under Burdwan Division, PHE Dte. AE(HQs),Assistant Engineer ,Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE.,Assistant Engineer, Durgapur Sub Division, P.H.E. Dte JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000428/2024-2025 3107/BWD 12/08/2024 90 TUBGRAM GRAMMYAK UNNAYAN SAMITY 309.60 0.00 0 50
5196 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Berwa Piped Water Supply Scheme , SM/06965 Retrofitting Continuation work order for Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Barwa village of Barwa piped water supply scheme within Burdwan Sub-Division under Burdwan Division, PHE Dte. [Phase-I](Tr No.-573/BWD/2020-21) Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000471/2020-2021 4627/BWD 25/11/2020 30 M/S SAYAN CHAKRABORTY 4.92 4.92 100 1
5197 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Berwa Piped Water Supply Scheme , SM/06965 Retrofitting Formal Work Order for Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of Barwa Piped Water Supply Scheme at Berwa (2 Nos Habitation Part), Mutra (2 Nos Habitation Part), Baneswarpur & Senpur (4 Nos Habitation) Village (Mouza), Memari-II Block under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000647/2020-2021 916/BWD 02/02/2021 90 KALYAN CHOWDHURY 45.14 0.00 0 1
5198 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Berwa Piped Water Supply Scheme , SM/06965 Retrofitting Extension of 75 mm dia pipeline at Miya Para, Modhya Bohar & Bhagar Para Purba Bohar regarding FHTC under Satgachia (Zone-I) water supply scheme under Burdwan Division, PHE Dte.[Gr.-A] Assistant Engineer ,Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000350/2021-2022 703/BSD 11/06/2021 5 M/S SAYAN CHAKRABORTY 0.88 0.00 0 1
5199 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Berwa Piped Water Supply Scheme , SM/06965 Retrofitting Emergency repaired cleaning of chokage AC Pipeline for BARWA Piped Water Supply Scheme (Retrrofittings)at Mutra, senpur, Mohanpur & Barwa village distribution line smooth drinking (FHTC) water supply within Memari-II Block under Burdwan Division, PHE Dte. Gr.C Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000563/2022-2023 1919/BSD 11/11/2022 15 A R TRADERS 0.79 0.79 100 1
5200 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Berwa Piped Water Supply Scheme , SM/06965 Retrofitting Formal Work Order for Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of Barwa Piped Water Supply Scheme at Berwa (2 Nos Habitation Part), Mutra (2 Nos Habitation Part), Baneswarpur & Senpur (4 Nos Habitation) Village (Mouza), Memari-II Block under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000038/2021-2022 3442/BWD 28/06/2021 90 KALYAN CHOWDHURY 45.14 24.44 54.14 100
5201 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Berwa Piped Water Supply Scheme , SM/06965 Retrofitting Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Bohar (Part) village (Bohar (Part) habitation) of Satgachia Piped Water Supply Scheme within Burdwan Sub-Divn. under Burdwan Division, PHE. Dte. [Sl. No. : ¿20¿] ORD/000667/2020-2021 70/BWD 05/01/2021 15 M/S SAYAN CHAKRABORTY 4.86 4.79 98.56 0
5202 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Berwa Piped Water Supply Scheme , SM/06965 Retrofitting Restoration of Pump House at Head Work site of BARWA Piped water supply scheme at Memari-II Block under Burdwan Division, Dist.-Purba Bardhaman Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER RWS BURDWAN SUB-DIVISION PHE DTE ORD/000133/2024-2025 1007/BSD 06/06/2024 30 I.S. ENTERPRISE 0.97 0.00 0 100
5203 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Berwa Piped Water Supply Scheme , SM/06965 Retrofitting Different Types of work involved in connection with different Augmentation & Retrofitting Schemes (06 Nos.) Piped Water Supply Scheme under Memari II Block within Burdwan Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/001269/2024-2025 848/BWD 05/03/2025 120 PROJECT INDIA 394.29 0.00 0 0
5204 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Palla Piped Water Supply Scheme , SM/06967 Retrofitting Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Palla(Pt-A) village of Palla piped water supply scheme within Burdwan Sub-Division under Burdwan Division, PHE Dte. [Phase-I](Tr No.-245/BWD/2020-21) Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000094/2020-2021 2746/BWD 10/08/2020 30 JAYANTA CHAKRABORTY 4.92 4.92 100 1
5205 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Palla Piped Water Supply Scheme , SM/06967 Retrofitting Continuation work order for Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Palla(Pt-A) village of Palla piped water supply scheme within Burdwan Sub-Division under Burdwan Division, PHE Dte. [Phase-I](Tr No.-487/BWD/2020-21) Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000117/2020-2021 3972/BWD 14/10/2020 30 JAYANTA CHAKRABORTY 4.92 4.92 100 1
5206 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Palla Piped Water Supply Scheme , SM/06967 Retrofitting Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Palla(Pt-B) village of Palla piped water supply scheme within Burdwan Sub-Division under Burdwan Division, PHE Dte. [Phase-I](Tr No.-246/BWD/2020-21) Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000082/2020-2021 2738/BWD 10/08/2020 30 S.C. ENTERPRISE 4.92 4.92 100 1
5207 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Palla Piped Water Supply Scheme , SM/06967 Retrofitting Continuation work order for Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Palla (Pt-B) village of Palla Piped Water Supply Scheme within Burdwan Sub-Divn. under Burdwan Division, PHE. Dte. [Phase - I] [GROUP : ¿11B¿] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000674/2020-2021 4912/BWD 08/12/2020 30 S.C. ENTERPRISE 4.92 4.88 99.19 1
5208 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Palla Piped Water Supply Scheme , SM/06967 Retrofitting Additional work providing Functional Household Tap connection (FHTC) from existing distribution system within the command area of Palla piped water supply scheme at Palla village (Mouza) Memari-I Block under Burdwan Division, PHE Dte. [Gr.-F] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000153/2021-2022 685/BSD 09/06/2021 30 S.C. ENTERPRISE 0.77 0.76 98.7 1
5209 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Palla Piped Water Supply Scheme , SM/06967 Retrofitting Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of PALLA Piped Water Supply Scheme at Palla(Paschim Palla Habitation Part)village(Mouza)Memari-I Block under Burdwan Division, PHE Dte.Gr.C Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000441/2021-2022 199/BSD 01/02/2022 30 MUKHERJEE ENTERPRISE 4.58 4.51 98.47 1
5210 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Palla Piped Water Supply Scheme , SM/06967 Retrofitting Providing Functional Household Tap Connection(FHTC)from existing distribution system within the command area of PALLA Water supply scheme at Palla(Paschim palla Habitation part) village (Mouza) opposite side of navigation cannel, in Memari-I Block including leftout household water tap connection(FHTC) under Burdwan Division, PHE Dte. Group : B Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000103/2022-2023 984/BSD 16/06/2022 30 DUBE ENTERPRISE 4.22 4.21 99.76 1
5211 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Palla Piped Water Supply Scheme , SM/06967 Retrofitting Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of Palla Piped Water Supply Scheme at Palla (Part) (7 Nos Habitation Part) Village (Mouza), Memari-I Block under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000023/2021-2022 3345/BWD 21/06/2021 30 M/S ASHA CONSTRUCTION 27.79 13.13 47.25 0
5212 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting at Gangatikuri PWSS , SM/06750 Retrofitting Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of GANGATIKURI Piped Water Supply Scheme at Ketugram-II Block under Burdwan Division, PHE Dte. AE(HQs) J.E. 2 BURDWAN ORD/000706/2020-2021 1007/BWD 05/02/2021 90 M/S ASOKE GHOSH & BROTHERS 47.52 29.44 61.95 1
5213 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting at Gangatikuri PWSS , SM/06750 Retrofitting Supply of 10 mm NB Gun-Metal Ferrule conforming to IS:2692-1989 for water tap connection in each house hold from existing distribution system within scheme jurisdiction in different piped water supply scheme within Katwa Sub-Division under Burdwan Division, PHE Dte. and delivered at Barsul Divisional Store.[Part-4] ORD/000108/2021-2022 3186/BWD 08/06/2021 30 R.K. INDUSTRIES 76.05 20.36 26.77 0
5214 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Fakirpur Piped Water Supply Scheme at Burdwan-I Block , SM/07797 Retrofitting Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of FAKIRPUR Piped Water Supply Scheme at Fakirpur & Bongpur village (Mouza), Burdwan - I Block under Burdwan Division, PHE Dte._2ND CALL. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000641/2020-2021 355/BWD 15/01/2021 45 AYSAN KHAN 36.69 10.26 27.96 1
5215 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Fakirpur Piped Water Supply Scheme at Burdwan-I Block , SM/07797 Retrofitting Construction of boundary wall at Head works site of Fakirpur water supply scheme under Bardhaman-I Block under Burdwan Division, PHE Dte.[Length-50.20 Mtr][Part-B][South & West Side][Gr.-C] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000558/2021-2022 1026/BSD 05/08/2021 45 AYSAN KHAN 3.77 0.00 0 1
5216 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Fakirpur Piped Water Supply Scheme at Burdwan-I Block , SM/07797 Retrofitting Providing Balance Functional Household Tap Connection (FHTC)for Swajal Gram from existing distribution system within the command area of Idilpur & Fakirpur village under Fakirpur Piped W/S.Scheme under Burdwan-I Block of Burdwan Sub-Division under Burdwan Division, PHE Dte. Gr. I Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000346/2022-2023 1380/BSD 05/08/2022 5 BAMDEB CONSTRUCTION & CO 0.96 0.96 100 100
5217 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Fakirpur Piped Water Supply Scheme at Burdwan-I Block , SM/07797 Retrofitting Providing Balance Functional Household Tap Connection(FHTC)for Swajal Gram from existing distribution system within the command area of Idilpur & Fakirpur Village under of FAKIRPUR W.S.Scheme of Burdwan-I Block of Burdwan Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000847/2022-2023 1380-A/BSD 05/08/2022 5 BAMDEB CONSTRUCTION & CO 0.96 0.00 0 0
5218 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Fakirpur Piped Water Supply Scheme at Burdwan-I Block , SM/07797 Retrofitting Providing 22 Nos.FHTC at IDILPUR & FAKIRPUR village for declearation of SWAJALGRAM under FAKIRPUR Piped Water Supply Scheme, Block- Burdwan-I within Burdwan Sub Division under Burdwan Division PHE Dte. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000166/2024-2025 1035/BSD 10/06/2024 30 IMPULSE INTERNATIONAL 0.75 0.00 0 0
5219 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Fakirpur Piped Water Supply Scheme at Burdwan-I Block , SM/07797 Retrofitting Providing 50 Nos. FHTC at Bongapur Casimama village for deceleration of SWAJALGRAM under FAKIRPUR Piped Water Supply Scheme , Block- Burdwan-I within Burdwan Sub Division under Burdwan Division PHE JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000297/2024-2025 1279/BSD 12/07/2024 45 S.M. ENTERPRISE 2.32 0.00 0 0
5220 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Fakirpur Piped Water Supply Scheme at Burdwan-I Block , SM/07797 Retrofitting Laying Parallel Pipeline, providing FHTC, Construction of Pathway and land development at Head Work site & Road restoration work for FAKIRPUR Piped Water Supply Scheme, Block- Burdwan-I, within Burdwan Sub Division under Burdwan Division PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/001016/2024-2025 62/BWD 06/01/2025 90 GENUINE ENGINEERS CO-OP. SOCIETY LTD. 20.75 0.00 0 0
5221 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Pratappur Piped Water Supply Scheme at Ausgram-II Block , SM/07808 Retrofitting Extension of pipeline at Pratappur DANDA PARA, BATHAN PARA, BANGAL PARA, HINDU PARA & ADIBASI PARA of PRATAPPUR (ZONE-I) and its adjoining mouza's Piped W/S Scheme including water tap connection (FHTC) at Babuisol Vill (Goswamibandh Adibashipara Hab.), Kuldiha Vill (Adibashipara Hab.) Lachminnarayanpur Vill (2 Nos. Hab.), Pratappur Vill (2 Nos. Habs.), Radhaballabhpur Vill (1 No. Hab), Ramharipur Vill (2 Nos. Hab.) Radhamohanpur Vill. (1 No. Hab.) at Ausgram-II Block under Burdwan Division, PHE Dte._2ND CALL Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000206/2021-2022 6393/BWD 16/11/2021 60 SAIKAT RAY 44.09 43.50 98.66 1
5222 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Pratappur Piped Water Supply Scheme at Ausgram-II Block , SM/07808 Retrofitting Extension of pipeline for providing FHTC at Pratappur CHITIM DANGA, RAMHARIPUR , MUSLIMPARA & DHANDAGHA of PRATAPPUR (ZONE-I) and its adjoining mouza's Piped W/S Scheme at Ausgram-II Block within Durgapur (Burdwan North)Sub Division under Burdwan Division, P.H.E. Dte. [Sl-E] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000566/2021-2022 134/DSD 02/03/2022 30 SAIKAT RAY 4.64 4.41 95.04 1
5223 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Pratappur Piped Water Supply Scheme at Ausgram-II Block , SM/07808 Retrofitting Connection from newly constructed Over Head Reservoir to Distribution System & Rising main Pipe Line of PRATAPPUR ( ZONE - I & II ) and its adjoining mouza's Piped W/S Scheme at Ausgram-II Block, within Durgapur (Burdwan North) Sub Division under Burdwan Division, P.H.E. Dte._2nd Call [Gr.-A] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000262/2021-2022 689/DSD 08/12/2021 21 S.S. ENTERPRISE 1.66 0.00 0 1
5224 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Pratappur Piped Water Supply Scheme at Ausgram-II Block , SM/07808 Retrofitting Extension of pipeline at Babuisole & Gosaibandh village of PRATAPPUR (ZONE-II) and its adjoining mouza's Piped W/S Scheme at Ausgram-II Block within Durgapur Sub Division under Burdwan Division, P.H.E. Dte. [Gr.-F] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000842/2020-2021 173/DSD 19/02/2021 21 RALLY CO-OP LABOUR CONTRACT & CONSTRUCTION SOCIETY LTD. 4.67 0.00 0 1
5225 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Pratappur Piped Water Supply Scheme at Ausgram-II Block , SM/07808 Retrofitting Extension of pipeline at Kuldiha & Raniganj village of PRATAPPUR (ZONE-II) and its adjoining mouza's Piped W/S Scheme at Ausgram-II Block within Durgapur Sub Division under Burdwan Division, P.H.E. Dte. [Gr.-E] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000843/2020-2021 172/DSD 19/02/2021 21 RELIABLE ENGINEERS CO.-OPERATIVE CONSTRUCTION SOCIETY LTD. 4.73 0.00 0 1
5226 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Pratappur Piped Water Supply Scheme at Ausgram-II Block , SM/07808 Retrofitting Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of PRATAPPUR Piped Water Supply Scheme at Raniganj (Part), Babuisol (Part), Pratappur (Part), village, habitation, Ausgram-II Block within Durgapur (Burdwan North) Sub Division under Burdwan Division, P.H.E. Dte. ORD/000920/2023-2024 5482/BWD 13/12/2023 30 N.S. ENTERPRISE 10.92 0.00 0 100
5227 PURBA BARDHAMAN Durgapur W/S Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Pratappur Piped Water Supply Scheme at Ausgram-II Block , SM/07808 Retrofitting Acceptance cum Formal Work Order for the work of Supplying and Laying of different dia UPVC pipe (LDS) including providing FHTC at Pratappur under PRATAPPUR PWSS, Block- Aushgram-II, Dist- Purba Bardhaman under Durgapur W/S Division, PHE Dte Assistant Engineer-II Contractual Junior Engineer_2 ORD/000054/2024-2025 770/DWSD 06/06/2024 115 KIRON ENTERPRISE 27.17 0.00 0 100
5228 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Takipur Piped Water Supply Scheme at Ausgram-I Block , SM/07809 Retrofitting Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of Takipur Piped Water Supply Scheme at Asinda, Chonari & Takipur Village (Mouza), Ausgram-I Block under Burdwan Division, PHE Dte. (Agreement No. 575/BWD of 2020-2021) AE(HQs) J.E. 2 BURDWAN ORD/000274/2020-2021 440/BWD 19/01/2021 45 KOUSIK MALLICK 36.91 33.10 89.68 1
5229 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Takipur Piped Water Supply Scheme at Ausgram-I Block , SM/07809 Retrofitting Extension of Pipeline for Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of TAKIPUR Piped Water Supply Scheme at Takipur (Part), Asinda (part) & Chanwari (Part) habitation, Ausgram-I Block within Durgapur (Burdwan North) Sub Division under Burdwan Division, P.H.E. Dte. AE(HQs) J.E. 2 BURDWAN ORD/000259/2021-2022 6693/BWD 01/12/2021 30 HAMID SK 20.08 19.98 99.5 1
5230 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Takipur Piped Water Supply Scheme at Ausgram-I Block , SM/07809 Retrofitting Extension of Pipeline for Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of TAKIPUR Piped Water Supply Scheme at Takipur (Part), Asinda (part) & Chanwari (Part) habitation, Ausgram-I Block within Durgapur (Burdwan North) Sub Division under Burdwan Division, P.H.E. Dte. [Sl-A] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer1, Durgapur Sub-Division, PHE Dte. ORD/000565/2021-2022 135/DSD 02/03/2022 30 HAMID SK 4.78 4.78 100 1
5231 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Takipur Piped Water Supply Scheme at Ausgram-I Block , SM/07809 Retrofitting Construction of Path way, Drain, Vertical Extension of valve chamber & repairing of OHR connection etc. including shifting of damage pipeline at Head work site of TAKIPUR water supply scheme, Block-Ausgram-II within Durgapur (Bardhaman North) Sub-Division under Burdwan Division, PHE Dte. [Gr.-H] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer1, Durgapur Sub-Division, PHE Dte. ORD/000230/2021-2022 662/DSD 22/11/2021 30 PAL CONSTRUCTION 4.02 3.95 98.26 1
5232 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Takipur Piped Water Supply Scheme at Ausgram-I Block , SM/07809 Retrofitting Installation of Sluice Valve, Air Valve and inter connection of Pipeline and allied works to regulate the water supply towards Ashinda & Takipur Village of TAKIPUR and its adjoining mouza's Piped W/S Scheme at Ausgram-I Block within Durgapur Sub Division under Burdwan Division, P.H.E. Dte. [SL-09] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer1, Durgapur Sub-Division, PHE Dte. ORD/000852/2022-2023 709/DSD 30/12/2022 30 HAMID SK 4.71 4.67 99.15 0
5233 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Takipur Piped Water Supply Scheme at Ausgram-I Block , SM/07809 Retrofitting Relaying of pipe line damaged by Construction of Health Centre & construction of road / drain etc. at different location of TAKIPUR and its adjoining mouza's Piped W/S Scheme at Ausgram-I Block within Durgapur Sub Division under Burdwan Division, P.H.E. Dte.[SL-9] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer1, Durgapur Sub-Division, PHE Dte. ORD/000047/2023-2024 175/DSD 18/04/2023 21 TARAMA AGENCY 0.77 0.77 100 100
5234 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Takipur Piped Water Supply Scheme at Ausgram-I Block , SM/07809 Retrofitting Relaying of pipe line damaged by Construction of Community Centre & construction of road / drain etc. at different location of TAKIPUR and its adjoining mouza's Piped W/S Scheme at Ausgram-I Block within Durgapur Sub Division under Burdwan Division, P.H.E. Dte.[SL-08] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer1, Durgapur Sub-Division, PHE Dte. ORD/000046/2023-2024 174/DSD 18/04/2023 21 TARAMA AGENCY 0.91 0.91 100 100
5235 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Ura Piped Water Supply Scheme at Galsi-II Block , SM/07810 Retrofitting Construction of drain and pathway at Head work site of URA piped water supply scheme, Block-Galsi-II within Durgapur (Bardhaman North) Sub-Division, under Burdwan Division, PHE Dte. SL-03 Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer1, Durgapur Sub-Division, PHE Dte. ORD/000529/2022-2023 648/DSD 03/11/2022 30 M/S PURBASHA 3.66 3.62 98.91 1
5236 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Ura Piped Water Supply Scheme at Galsi-II Block , SM/07810 Retrofitting Formal Work Order for Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of URA Piped Water Supply Scheme at Ura (1 No Part & 1 No Habitation), Sarul (2 Nos Habitation) & Adrahati Village (Mouza), Gaisi-II Block under Burdwan Division, PHE Dte..(Agreement No. 95/SE/CC/PHE/Dte of 2020-2021) Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000445/2020-2021 1087/BWD 08/02/2021 60 M/S PURBASHA 66.70 44.48 66.69 1
5237 PURBA BARDHAMAN Durgapur W/S Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Ura Piped Water Supply Scheme at Galsi-II Block , SM/07810 Retrofitting Quotation for new service connection at URA PWSS TW-I under CMD/PHED BILL/00215/2024-2025 BP-2024-25-104 03/12/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED 6.65 0.00 0 0
5238 PURBA BARDHAMAN Durgapur W/S Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Ura Piped Water Supply Scheme at Galsi-II Block , SM/07810 Retrofitting Acceptance cum Formal Work Order For the work of " Sinking of 250 x 150mm x 150mtr deapth by DR Rig, Construction of 01 (One) no temporary Kiosk for the necessary arrangement of electrification of Tube Well including laying UPVC distribution system (LDS) and other allied works at URA PWSS, Block-Galsi-II, Dist- Purba Bardhaman under Durgapur W/S Division,PHE Dte. Assistant Engineer-II Contractual Junior Engineer_3 ORD/000040/2024-2025 753/DWSD 05/06/2024 300 SURAJIT MANDAL 20.93 0.00 0 100
5239 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Amrargar Piped Water Supply Scheme at Ausgram-II Block , SM/07817 Retrofitting Restoration of village Road dismantled by laying pipeline for providing FHTC at Amarargarh Mandalpara of AMARARGARH Piped Water Supply Scheme [Retrofitting] under Ausgram-II Block within Durgapur (Burdwan North) Sub Division under Burdwan Division, P.H.E. Dte. [SL-08] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer1, Durgapur Sub-Division, PHE Dte. ORD/000032/2023-2024 156/DSD 13/04/2023 21 PARTHA RAY 0.96 0.95 98.96 100
5240 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Amrargar Piped Water Supply Scheme at Ausgram-II Block , SM/07817 Retrofitting Restoration of village Road dismantled by laying pipeline for providing FHTC at Amarargarh Dakshinpara of AMARARGARH Piped Water Supply Scheme [Retrofitting] under Ausgram-II Block within Durgapur (Burdwan North) Sub Division under Burdwan Division, P.H.E. Dte.[SL-07] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer1, Durgapur Sub-Division, PHE Dte. ORD/000031/2023-2024 155/DSD 13/04/2023 21 RAM MOHAN MUKHERJEE 0.97 0.96 98.97 100
5241 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Amrargar Piped Water Supply Scheme at Ausgram-II Block , SM/07817 Retrofitting Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of Amrargarh Piped Water Supply Scheme at Amrargarh (10 Nos Habitation), Dombandi (2 Nos Habitation), Jamtara (2 Nos Habitation) & Panch Mahali Village (Mouza), Ausgram-II Block under Burdwan Division, PHE Dte. Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000103/2021-2022 3875/BWD 27/07/2021 60 B.B.C. ENTERPRISE 91.55 73.62 80.42 1
5242 PURBA BARDHAMAN Durgapur W/S Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Amrargar Piped Water Supply Scheme at Ausgram-II Block , SM/07817 Retrofitting Acceptance cum Formal work order for the work of " Supplying and Laying of different dia UPVC pipe (LDS) including providing FHTC and Repairing and renovation of existing RCC OHR at Amrargarh under Amarargarh PWSS, Block- Aushgram-II, Dist- Purba Bardhaman under Durgapur W/S Division, PHE Dte. Assistant Engineer-II Contractual Junior Engineer_2 ORD/000041/2024-2025 751/DWSD 05/06/2024 300 SAIKAT RAY 36.37 0.00 0 100
5243 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Amrargar Piped Water Supply Scheme at Ausgram-II Block , SM/07817 Retrofitting Restoration of village Road dismantled by laying pipeline for providing FHTC at Amarargarh Ankurepara, Bonpara & Sahapara of AMARARGARH Piped Water Supply Scheme [Rectrofitting] under Ausgram-II Block within Durgapur (Burdwan North) Sub Division under Burdwan Division, P.H.E. Dte. [SL-06] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer1, Durgapur Sub-Division, PHE Dte. ORD/000030/2023-2024 154/DSD 13/04/2023 637 SAIKAT RAY 0.97 0.00 0 100
5244 PURBA BARDHAMAN Burdwan Division Augmentation of ground water based BAHARAN-BIRHIMPUR PWSS to accommodate FHTC in Ketugram-II block under Katwa Sub Division of Burdwan Division in Purba Bardhaman District , SM/09406 Augmentation Route Survey and preparation of DPR for BAHARAN BIRHIMPUR PWSS under Ketugram-II Block under Katwa Sub-Division under Burdwan Division PHE Dte. [Sl No-01] Assistant Engineer ORD/000537/2021-2022 43/KTS 24/01/2022 21 RADIANT 2.60 2.60 100 1
5245 PURBA BARDHAMAN Burdwan Division Augmentation of ground water based BAHARAN-BIRHIMPUR PWSS to accommodate FHTC in Ketugram-II block under Katwa Sub Division of Burdwan Division in Purba Bardhaman District , SM/09406 Augmentation Supply of materials for different water supply scheme under Burdwan Division, PHE Dte. VCH/001578/2021-2022 1207/DW 10/03/2022 EXECUTIVE ENGINEER, RESOURCES DIVISION, P.H.E. DTE. 3,005.00 0.00 0 0
5246 PURBA BARDHAMAN Burdwan Division Augmentation of ground water based BAHARAN-BIRHIMPUR PWSS to accommodate FHTC in Ketugram-II block under Katwa Sub Division of Burdwan Division in Purba Bardhaman District , SM/09406 Augmentation Material Requisition To Resource Division RTOR000085/2021-2022 882/BWD 11/02/2022 Resource Division 7.08 0.00 0 0
5247 PURBA BARDHAMAN Burdwan Division Augmentation of ground water based BAHARAN-BIRHIMPUR PWSS to accommodate FHTC in Ketugram-II block under Katwa Sub Division of Burdwan Division in Purba Bardhaman District , SM/09406 Augmentation Material Requisition To Resource Division RTOR000051/2021-2022 534/BWD 27/01/2022 Resource Division 11.25 0.00 0 0
5248 PURBA BARDHAMAN Burdwan Division Augmentation of ground water based BAHARAN-BIRHIMPUR PWSS to accommodate FHTC in Ketugram-II block under Katwa Sub Division of Burdwan Division in Purba Bardhaman District , SM/09406 Augmentation Material Requisition To Resource Division RTOR000202/2021-2022 1525/BWD 15/03/2022 Resource Division 0.37 0.00 0 0
5249 PURBA BARDHAMAN Burdwan Division Augmentation of ground water based BAHARAN-BIRHIMPUR PWSS to accommodate FHTC in Ketugram-II block under Katwa Sub Division of Burdwan Division in Purba Bardhaman District , SM/09406 Augmentation Augmentation of BAHRAN BIRAHIMPUR Piped Water Supply Scheme with LDS, FHTC, Rising main, Construction of 250 cum capacity OHR with 20.0 mtr. Staging height inclusive of soil investigation with repairing of Pump house -I & II under Ketugram-II Block, District:- Purba-Burdwan. Assistant Engineer JUNIOR ENGINEER R.W.S. BURDWAN SUB-DIVISION PHE DTE ORD/000060/2022-2023 2252/BWD 02/05/2022 365 ASHOK MITRA 290.62 140.27 48.27 100
5250 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap connection (FHTC) by retrofitting within the command area of KULINGRAM Piped Water Supply Scheme at JAMALPUR Block under Burdwan Division, P.H.E. DTE. , SM/08711 Retrofitting Providing Functional Household Tap Connection (FHTC) for the balance household in (Kolsara, Kulingram Uttar, Kulingram Dakshin, Ranapara Uttar, Ranapara Dakshin, Dutta Para, Kantagoria, Gokul, Gopalpur, Reora & Chack) Part Habitations from existing distribution system within the command area of KULINGRAM Piped Water Supply Scheme at Jamalpur Block under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000126/2021-2022 4536/BWD 06/09/2021 30 SK ALIM 31.20 30.00 96.15 1
5251 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap connection (FHTC) by retrofitting within the command area of KULINGRAM Piped Water Supply Scheme at JAMALPUR Block under Burdwan Division, P.H.E. DTE. , SM/08711 Retrofitting Extension of pipeline for KULINGRAM Water Supply Scheme FOR FHTC work within Jamalpur Block , under Burdwan Division, PHE Dte. Gr.B Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000440/2021-2022 198/BSD 01/02/2022 30 SK ALIM 4.34 3.37 77.65 1
5252 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap connection (FHTC) by retrofitting within the command area of KULINGRAM Piped Water Supply Scheme at JAMALPUR Block under Burdwan Division, P.H.E. DTE. , SM/08711 Retrofitting HDPE pipeline of 75 mm dia of Kulingram water supply scheme for FHTC (Gopalpur, Ranapara, Koisara, Gokul Katagoria)of Jamalpur Block under Burdwan Division, PHE Dte.[Gr.-A] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000703/2021-2022 1424/BSD 25/10/2021 30 SK ALIM 4.52 4.48 99.12 1
5253 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap connection (FHTC) by retrofitting within the command area of KULINGRAM Piped Water Supply Scheme at JAMALPUR Block under Burdwan Division, P.H.E. DTE. , SM/08711 Retrofitting Relaying of damage of pipeline due to irrigation cannel and 75 mm dia HDPE pipeline with FHTC for KULINGRAM Water Supply Scheme within Jamalpur Block,under Burdwan Division, PHE Dte. Group : A Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000088/2022-2023 828/BSD 23/05/2022 30 BISWAKARMA CONSTRUCTION 4.96 4.66 93.95 1
5254 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap connection (FHTC) by retrofitting within the command area of KULINGRAM Piped Water Supply Scheme at JAMALPUR Block under Burdwan Division, P.H.E. DTE. , SM/08711 Retrofitting Sinking of additional 250 X 200mm dia Tube Well 150 mtr. Depth by D.R. Rig method using UPVC pipe (CD) and UPVC Deep Well Screen (RDS) for KULINGRAM Piped Water Supply Scheme, Block - Jamalpur, Dist - Purba Bardhaman under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000073/2022-2023 2473/BWD 12/05/2022 30 NADIA TUBEWELLS 10.32 0.00 0 1
5255 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap connection (FHTC) by retrofitting within the command area of KULINGRAM Piped Water Supply Scheme at JAMALPUR Block under Burdwan Division, P.H.E. DTE. , SM/08711 Retrofitting Extension of pipeline for Kulingram Water Supply Scheme (Rewra village, Gokul Village, Kulingram uttar Village, Chak Village, Ranapara Village, Kantagaria Village, Mirjapur Village, Duttapara Village, Kolsara Village, Gopalpur Village) within Jamalpur Block including water tap connection (FHTC) under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. Junior Engineer, R.W.S. Burdwan Sub Division, P.H.E. Dt ORD/000007/2021-2022 3116/BWD 02/06/2021 60 SK ALIM 151.26 145.73 96.34 0
5256 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap connection (FHTC) by retrofitting within the command area of KULINGRAM Piped Water Supply Scheme at JAMALPUR Block under Burdwan Division, P.H.E. DTE. , SM/08711 Retrofitting Designing, Making and Erection of Sign Board for SAJAL GRAM in Gopalpur Village, Jamalpur Block within Kulingram PWSS under Burdwan Division, PHE Dte. (5 Nos Board) AE(HQs) J.E. 1 BURDWAN ORD/000796/2023-2024 875/AE/HQ 07/11/2023 30 PAPRI HAZRA 0.76 0.00 0 100
5257 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap connection (FHTC) by retrofitting within the command area of KULINGRAM Piped Water Supply Scheme at JAMALPUR Block under Burdwan Division, P.H.E. DTE. , SM/08711 Retrofitting Designing, Making and Erection of Sign Board for SAJAL GRAM in Gangarambati Village, Jamalpur Block within Kulingram PWSS under Burdwan Division, PHE Dte. (5 Nos Board) AE(HQs) J.E. 1 BURDWAN ORD/000797/2023-2024 876/AE/HQ 07/11/2023 30 PAPRI HAZRA 0.76 0.72 94.74 100
5258 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap connection (FHTC) by retrofitting within the command area of KULINGRAM Piped Water Supply Scheme at JAMALPUR Block under Burdwan Division, P.H.E. DTE. , SM/08711 Retrofitting Laying of Interconnection of 4th Tube well site and Laying of 90 mm dia HDPE pipeline for KULINGRAM Piped Water Supply Scheme to provide house connection within Burdwan Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. RWS_JAMALPUR ORD/000622/2023-2024 3917/BWD 05/09/2023 30 BARABELUN NO.-II G.P. UNEMPLOYED CO-OP LABOUR CONTRACT & CONSTRUCTION SOCIETY LTD. 8.28 0.00 0 100
5259 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap connection (FHTC) by retrofitting within the command area of KULINGRAM Piped Water Supply Scheme at JAMALPUR Block under Burdwan Division, P.H.E. DTE. , SM/08711 Retrofitting Providing FHTC for Declaration of Sajal Gram at Duttapara (25 Nos), Kamalpur (04 Nos) and Chak Mujaffarpur (07) Mouzas (Habitation) for KULINGRAM Piped W/S Scheme, Jamalpur Dev. Block under Burdwan Division, PHE Dte._2ND CALL AE(HQs) Junior Engineer, Burdwan Division ORD/000838/2024-2025 967/AE/HQ 22/11/2024 30 SOUMYAVASH DAS 2.47 0.00 0 100
5260 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap connection (FHTC) by retrofitting within the command area of KULINGRAM Piped Water Supply Scheme at JAMALPUR Block under Burdwan Division, P.H.E. DTE. , SM/08711 Retrofitting Construction of Boundary wall, Land Development for various PWSS, Block- Jamalpur, District:- Purba-Bardhaman within Burdwan Sub Division under Burdwan Division PHE Dte. AE(HQs) ORD/001100/2024-2025 433/BWD 20/01/2025 120 RABINDRA NATH GORANG 132.64 0.00 0 0
5261 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Krishnabati Piped Water Supply Scheme at Purbasthali-II Block , SM/07827 Retrofitting Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of Krishnabati Piped Water Supply Scheme at Bahara (3 Nos Habitation), Chak Bahara (Natungram Habitation), Chandanpur Simuldanga & Krishnabati (2 Nos Habitation) Village (Mouza), Mangalkot Block under Burdwan Division, PHE Dte. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000088/2021-2022 3592/BWD 13/07/2021 60 H SAMANTA 84.33 62.90 74.59 100
5262 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Krishnabati Piped Water Supply Scheme at Purbasthali-II Block , SM/07827 Retrofitting NAME OF THE WORK -RESTORATION WORK OF BIDYANAGAR TO VIA DAMODAR PARA TO BOGPUR ROAD,PACKAGE NO-WB-22-27,BLOCK-PURBASTHALI-1,GP-SRIRAMPUR & JAHANNAGAR. BILL/00739/2024-2025 893/JJM 25/09/2024 EXECUTIVE ENGINEER (WBSRDA) PURBA BARDHAMAN DIVISION 5.21 0.00 0 null
5263 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Krishnabati Piped Water Supply Scheme at Purbasthali-II Block , SM/07827 Retrofitting Quotation from WBSEDCL for new service connection charges of Krishnabati w/s scheme under Burdwan Division, PHE Dte. (Application No.-5004422952)(Ref. ID-503758136) BILL/00902/2024-2025 1048/JJM 30/10/2024 WBSEDCL 7.08 0.00 0 0
5264 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Krishnabati Piped Water Supply Scheme at Purbasthali-II Block , SM/07827 Retrofitting Different types of works involve in connection with Augmentation of KRISHNABATI (SM/07827), PURBASTHLI (SM/07866), SINHARI (SM/09716) & SURFACE based W/S Scheme (SM/15571) Piped water supply scheme under Purbasthali-II Block, Kalna Sub-Division, PHE Dte. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000181/2024-2025 2296/BWD 20/06/2024 360 M/S DATTA ENTERPRISE 579.85 14.26 2.46 2
5265 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Krishnabati Piped Water Supply Scheme at Purbasthali-II Block , SM/07827 Retrofitting Different Types of work involved in connection with Augmentation of 6 Nos. [(SM/07827), (SM/07866), (SM/16196), (SM/18314), (SM/16021), (SM/16019)] Piped Water Supply Scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/001144/2024-2025 618/BWD 11/02/2025 180 M/S DATTA ENTERPRISE 578.09 0.00 0 0
5266 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED KETUGRAM (ZONE I & II) PWSS TO ACCOMMODATE FHTC IN KETUGRAM I & II BLOCK UNDER KATWA SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/10085 Augmentation Route Survey and Preparation of DPR for KETUGRAM (ZONE-I & II ) PWSS under Ketugram-I & II Block under Katwa Sub-Division under Burdwan Division PHE Dte. [Sl No-06] Assistant Engineer ORD/000547/2021-2022 66/KTS 27/01/2022 21 RADIANT 4.81 4.91 102.08 1
5267 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED KETUGRAM (ZONE I & II) PWSS TO ACCOMMODATE FHTC IN KETUGRAM I & II BLOCK UNDER KATWA SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/10085 Augmentation Supply of materials for different water supply scheme under Burdwan Division, PHE Dte. VCH/001578/2021-2022 1207/DW 10/03/2022 EXECUTIVE ENGINEER, RESOURCES DIVISION, P.H.E. DTE. 3,005.00 0.00 0 0
5268 PURBA BARDHAMAN Central Mechanical AUGMENTATION OF GROUND WATER BASED KETUGRAM (ZONE I & II) PWSS TO ACCOMMODATE FHTC IN KETUGRAM I & II BLOCK UNDER KATWA SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/10085 Augmentation Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-2 at Augmentation of Ketugram Water Supply Scheme [Zone-I ] under CMD, PHE Dte., Dist.- Purba-Bardhaman ASSISTANT ENGINEER ORD/000624/2022-2023 2098/CMD 08/09/2022 30 STANDARD ELECTRICALS 11.51 10.86 94.35 1
5269 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED KETUGRAM (ZONE I & II) PWSS TO ACCOMMODATE FHTC IN KETUGRAM I & II BLOCK UNDER KATWA SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/10085 Augmentation Supply and delivery of different dia. CIDF sluice valve for Augmentation of Baharan-Birampur, Kaithan, Majhigram-Sigot & Ketugram (Zone-I & II) Piped Water Supply Scheme within Katwa Sub-Division under Burdwan Division, P.H.E. Dte. Assistant Engineer ORD/000518/2022-2023 4702/BWD 19/10/2022 20 SSPR VALVE MANUFACTURING PVT LTD. 14.45 0.00 0 1
5270 PURBA BARDHAMAN Central Mechanical AUGMENTATION OF GROUND WATER BASED KETUGRAM (ZONE I & II) PWSS TO ACCOMMODATE FHTC IN KETUGRAM I & II BLOCK UNDER KATWA SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/10085 Augmentation Supply & Installation of Submersible Pumping Machinery , Voltage Stabilizer, Chlorination system and internal House wiring for Tube well no.- 1 at Augumentation of Ketugram (Zone - I) Water Supply Scheme under CMD, PHE Dte., Dist.- Purba-Bardhaman. Driller In-Charge Junior Engineer ORD/000062/2023-2024 2569/CMD 06/06/2023 30 M/S, MONDAL ASSOCIATES. 10.98 0.00 0 0
5271 PURBA BARDHAMAN Central Mechanical AUGMENTATION OF GROUND WATER BASED KETUGRAM (ZONE I & II) PWSS TO ACCOMMODATE FHTC IN KETUGRAM I & II BLOCK UNDER KATWA SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/10085 Augmentation Supply & Installation of Submersible Pumping Machinery , Voltage Stabilizer, Chlorination system and internal House wiring for Tube well no.- 1 & 3 at Augumentation of Ketugram (Zone - II) Water Supply Scheme under CMD, PHE Dte., Dist.- Purba-Bardhaman. Driller In-Charge Junior Engineer ORD/000077/2023-2024 2573/CMD 06/06/2023 30 SOUNAK ENTERPRISE 21.96 0.00 0 0
5272 PURBA BARDHAMAN Central Mechanical AUGMENTATION OF GROUND WATER BASED KETUGRAM (ZONE I & II) PWSS TO ACCOMMODATE FHTC IN KETUGRAM I & II BLOCK UNDER KATWA SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/10085 Augmentation Supply , delivery & Installation of Submersible Pumping Machinery , Voltage stabiliser , Chlorinator and Internal House wiring for Tube well No. 3 of Kandra [ Ketugram ] Water Supply Scheme under CMD, PHE Dte., Dist.- Purba-Bardhaman. [ Block - Ketugram-I ] ASSISTANT ENGINEER ORD/000007/2022-2023 1170/CMD 27/06/2022 365 ELECTRICAL & MECHANICAL ENGINEERING CORPORATION 10.38 9.64 92.87 1
5273 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED KETUGRAM (ZONE I & II) PWSS TO ACCOMMODATE FHTC IN KETUGRAM I & II BLOCK UNDER KATWA SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/10085 Augmentation Material Requisition To Resource Division RTOR000156/2021-2022 1248/BWD 07/03/2022 Resource Division 4.32 0.00 0 0
5274 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED KETUGRAM (ZONE I & II) PWSS TO ACCOMMODATE FHTC IN KETUGRAM I & II BLOCK UNDER KATWA SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/10085 Augmentation Material Requisition To Resource Division RTOR000227/2021-2022 1549/BWD 15/03/2022 Resource Division 0.37 0.00 0 0
5275 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED KETUGRAM (ZONE I & II) PWSS TO ACCOMMODATE FHTC IN KETUGRAM I & II BLOCK UNDER KATWA SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/10085 Augmentation Material Requisition To Resource Division RTOR000176/2021-2022 1334/BWD 08/03/2022 Resource Division 114.05 0.00 0 0
5276 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED KETUGRAM (ZONE I & II) PWSS TO ACCOMMODATE FHTC IN KETUGRAM I & II BLOCK UNDER KATWA SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/10085 Augmentation Material Requisition To Resource Division RTOR000035/2022-2023 4631/BWD 17/10/2022 Resource Division 0.06 0.00 0 0
5277 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED KETUGRAM (ZONE I & II) PWSS TO ACCOMMODATE FHTC IN KETUGRAM I & II BLOCK UNDER KATWA SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/10085 Augmentation Material Requisition To Resource Division RTOR000012/2022-2023 3271/BWD 29/07/2022 Resource Division 50.19 0.00 0 0
5278 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED KETUGRAM (ZONE I & II) PWSS TO ACCOMMODATE FHTC IN KETUGRAM I & II BLOCK UNDER KATWA SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/10085 Augmentation Inter connection work with MS pipe from OHR to Distribution system and restoration of village road and drains for Augmentation of KETUGRAM Z-II Piped Water Supply Scheme under Ketugram-II Block, Dist-Purba Bardhaman. Assistant Engineer JE, Katwa Sub-Division ORD/000909/2023-2024 5481/BWD 13/12/2023 120 S & P ENTERPRISE 181.31 38.60 21.29 40
5279 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED KETUGRAM (ZONE I & II) PWSS TO ACCOMMODATE FHTC IN KETUGRAM I & II BLOCK UNDER KATWA SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/10085 Augmentation Sinking of additional 300 X 200mm dia Tube Well 150 mtr. Depth by D.R. Rig method using UPVC pipe (CD) and UPVC Deep Well Screen (RDS) for Augmentation of KETUGRAM (ZONE-I) Piped Water Supply Scheme, Block - Ketugram - II, Dist - Purba Bardhaman under Burdwan Division, PHE Dte. [2 Nos. GTW]. Assistant Engineer JUNIOR ENGINEER KATWA SUB-DIVISION PHE DTE ORD/000067/2022-2023 2420/BWD 11/05/2022 45 AUXILIARY TUBE WELL DRILLERS 23.90 0.00 0 100
5280 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED KETUGRAM (ZONE I & II) PWSS TO ACCOMMODATE FHTC IN KETUGRAM I & II BLOCK UNDER KATWA SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/10085 Augmentation Quotation from WBSEDCL for new service connection of Augmentation of ground water based Ketugram Zone-I PWSS. BILL/00516/2024-2025 688/JJM 14/08/2024 WBSEDCL 9.28 0.00 0 0
5281 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED KETUGRAM (ZONE I & II) PWSS TO ACCOMMODATE FHTC IN KETUGRAM I & II BLOCK UNDER KATWA SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/10085 Augmentation Balance Work For OHR, Extension Of Pipeline To Provide FHTC With Sinking Of Tube Well, Construction Of Pump House, Boundary Wall, Land Development, Plinth Protection For Pump House, Approach Road & Other Related Work Under Bakalsa, Chakdaha, Ehaipur, Khatundi And Ketugram (Zone-I) Part-A & B PWSS Under Katwa Sub Division, Block- Ketugram-I, Burdwan Division PHE Dte. Assistant Engineer JUNIOR ENGINEER R.W.S. BURDWAN SUB-DIVISION PHE DTE ORD/000288/2024-2025 2741/BWD 12/07/2024 120 M/S M.M. ENTERPRISE 205.15 0.00 0 65
5282 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED KETUGRAM (ZONE I & II) PWSS TO ACCOMMODATE FHTC IN KETUGRAM I & II BLOCK UNDER KATWA SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/10085 Augmentation Augmentation of KETUGRAM ZONE-II Piped Water Supply Scheme with LDS, FHTC, & Construction of 1250 cum capacity OHR with 20.0 mtr. Staging height inclusive of soil investigation under Ketugram-II Block, District:- Purba-Burdwan. Assistant Engineer JE, Katwa Sub-Division,Junior Engineer2, Durgapur Sub-Division, PHE Dte. ORD/000125/2022-2023 2996/BWD 05/07/2022 365 S & P ENTERPRISE 1,064.91 870.63 81.76 90
5283 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED KETUGRAM (ZONE I & II) PWSS TO ACCOMMODATE FHTC IN KETUGRAM I & II BLOCK UNDER KATWA SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/10085 Augmentation Sinking of additional 300 X 200mm dia Tube Well 150 mtr. Depth by D.R. Rig method using UPVC pipe (CD) and UPVC Deep Well Screen (RDS) for Augmentation of KETUGRAM (ZONE-II) Piped Water Supply Scheme, Block - Ketugram - II, Dist - Purba Bardhaman under Burdwan Division, PHE Dte. [3 Nos. GTW]. Assistant Engineer JUNIOR ENGINEER KATWA SUB-DIVISION PHE DTE ORD/000068/2022-2023 2421/BWD 11/05/2022 60 AUXILIARY TUBE WELL DRILLERS 35.85 0.00 0 80
5284 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED KETUGRAM (ZONE I & II) PWSS TO ACCOMMODATE FHTC IN KETUGRAM I & II BLOCK UNDER KATWA SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/10085 Augmentation Augmentation of KETUGRAM ZONE-I (PART-A & PART-B) Piped Water Supply Scheme with LDS, FHTC, & Construction of 700 cum & 200 Cum capacity OHR with 20.0 mtr. Staging height inclusive of soil investigation respectively under Ketugram-I Block, District:- Purba-Burdwan. Assistant Engineer JUNIOR ENGINEER R.W.S. BURDWAN SUB-DIVISION PHE DTE ORD/000149/2022-2023 3075/BWD 11/07/2022 1135 M/S S.S. ENTERPRISE 930.60 442.35 47.53 70
5285 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED KETUGRAM (ZONE I & II) PWSS TO ACCOMMODATE FHTC IN KETUGRAM I & II BLOCK UNDER KATWA SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/10085 Augmentation Continuation work order for Supply of 1 (one) No. Diesel driven Ambassador Car (Luxury Taxi) / Motor Cab on hire basis for the Office of the Assistant Engineer, under Katwa Sub-Division within Burdwan Division, P.H.E. Dte. [Period from 01.01.2025 to 30.06.2025]. Assistant Engineer JUNIOR ENGINEER KATWA SUB-DIVISION PHE DTE ORD/001026/2024-2025 1810/KTS 31/12/2024 180 KRISHNA MONDAL 2.40 0.40 16.67 20
5286 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED KETUGRAM (ZONE I & II) PWSS TO ACCOMMODATE FHTC IN KETUGRAM I & II BLOCK UNDER KATWA SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/10085 Augmentation Supply of various D.I. Mechanical joints & specials for Aug. of KETUGRAM (Zone-I & II) Piped W/S. Scheme within Katwa Sub-Division under Burdwan Division, PHE. Dte. [Part-B]. AE(HQs) JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000303/2024-2025 2826/BWD 19/07/2024 216 KEJRIWAL CASTINGS LIMITED 4.82 0.00 0 100
5287 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED KETUGRAM (ZONE I & II) PWSS TO ACCOMMODATE FHTC IN KETUGRAM I & II BLOCK UNDER KATWA SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/10085 Augmentation Supply of various D.I. Mechanical joints & specials for Aug. of KETUGRAM (Zone-I & II) Piped W/S. Scheme within Katwa Sub-Division under Burdwan Division, PHE. Dte. [Part-A]. AE(HQs) JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000314/2024-2025 2838/BWD 19/07/2024 215 ELECTROSTEEL CASTING LIMITED 4.95 0.00 0 100
5288 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED KETUGRAM (ZONE I & II) PWSS TO ACCOMMODATE FHTC IN KETUGRAM I & II BLOCK UNDER KATWA SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/10085 Augmentation Supply of various D.I. Mechanical joints & specials for Aug. of KETUGRAM (Zone-I & II) Piped W/S. Scheme within Katwa Sub-Division under Burdwan Division, PHE. Dte. [Part-C]. AE(HQs) JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000307/2024-2025 2830/BWD 19/07/2024 224 JINDAL SAW LTD. 4.63 0.00 0 100
5289 PURBA BARDHAMAN Burdwan Division AGUMENTATION OF GROUND WATER BASED BAIDYAPUR PWSS TO ACCOMMODATE FHTC IN KALNA-II BLOCK UNDER KALNA SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT (ZONE-I & ZONE-II) , SM/10032 Augmentation Preparation of DPR for augmentation of Baidyapur W/S Scheme (Zone-I & II) within Kalna Sub-Division under Burdwan Division, PHE Dte. (Sl No-A) Assistant Engineer ORD/000568/2021-2022 203/KSD 23/02/2022 21 INDRANIL DUTTA & ASSOCIATES 4.19 4.17 99.52 1
5290 PURBA BARDHAMAN Burdwan Division AGUMENTATION OF GROUND WATER BASED BAIDYAPUR PWSS TO ACCOMMODATE FHTC IN KALNA-II BLOCK UNDER KALNA SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT (ZONE-I & ZONE-II) , SM/10032 Augmentation Sinking of 250 X 150mm dia Tube Well 150 mtr. Depth by D.R. Rig method using UPVC pipe (CM) and UPVC Medium Well Screen (RMS) for 2nd TW Site of Aug. of BAIDYAPUR (Z-II) & its adjoining mouzas Piped Water Supply Scheme, Block ? Kalna ? II, Dist - Purba Bardhaman under Burdwan Division, PHE Dte._2ND CALL. Assistant Engineer ORD/000567/2022-2023 5274/BWD 30/11/2022 30 SUSUNIA GP CO. OPERATIVE LABOUR CONTRACT AND CONSTRUCTION SOCIETY LTD. 7.33 6.97 95.09 0
5291 PURBA BARDHAMAN Burdwan Division AGUMENTATION OF GROUND WATER BASED BAIDYAPUR PWSS TO ACCOMMODATE FHTC IN KALNA-II BLOCK UNDER KALNA SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT (ZONE-I & ZONE-II) , SM/10032 Augmentation New service connection quotation from WBSEDCL of Augmentation of Baidyapur Z-II (T.W.-3) under Burdwan Division, PHE Dte. BILL/00098/2023-2024 194/JJM 31/05/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LTD. 4.56 0.00 0 0
5292 PURBA BARDHAMAN Central Mechanical AGUMENTATION OF GROUND WATER BASED BAIDYAPUR PWSS TO ACCOMMODATE FHTC IN KALNA-II BLOCK UNDER KALNA SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT (ZONE-I & ZONE-II) , SM/10032 Augmentation Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Augmentation of BAIDYAPUR PWSS under CMD, PHE Dte., Dist.- Purba-Bardhaman ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000912/2022-2023 1036/CMD 02/03/2023 30 BEHERA ENTERPRISE 11.46 11.13 97.12 80
5293 PURBA BARDHAMAN Burdwan Division AGUMENTATION OF GROUND WATER BASED BAIDYAPUR PWSS TO ACCOMMODATE FHTC IN KALNA-II BLOCK UNDER KALNA SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT (ZONE-I & ZONE-II) , SM/10032 Augmentation Sinking of 250 X 150mm dia Tube Well 150 mtr. Depth by D.R. Rig method using UPVC pipe (CD) and UPVC Deep Well Screen (RDS) for Aug. of BAIDYAPUR (Z-I) PWSS, Block - Kalna - II and NANDAI PWSS, Block - Kalna - I Piped Water Supply Scheme, Dist - Purba Bardhaman under Burdwan Division, PHE Dte. [For 02 Nos. Tube well]. ORD/000151/2023-2024 2424/BWD 30/05/2023 45 KOUSIK MALLICK 19.84 9.14 46.07 100
5294 PURBA BARDHAMAN Burdwan Division AGUMENTATION OF GROUND WATER BASED BAIDYAPUR PWSS TO ACCOMMODATE FHTC IN KALNA-II BLOCK UNDER KALNA SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT (ZONE-I & ZONE-II) , SM/10032 Augmentation Material Requisition To Resource Division RTOR000001/2022-2023 3272/BWD 29/07/2022 Resource Division 31.47 0.00 0 0
5295 PURBA BARDHAMAN Central Mechanical AGUMENTATION OF GROUND WATER BASED BAIDYAPUR PWSS TO ACCOMMODATE FHTC IN KALNA-II BLOCK UNDER KALNA SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT (ZONE-I & ZONE-II) , SM/10032 Augmentation Supply and delivery of different Electro-mechanical items for Baidyapur zone-1 Water Supply Scheme PH 1 replacement T.W (part-1) under CMD, PHE Dte., Dist.- Purba-Bardhaman ASSISTANT ENGINEER JUNIOR ENGINEER ORD/001670/2023-2024 64/CMSD 11/01/2024 12 SUBRATA BHADRA 0.96 0.00 0 100
5296 PURBA BARDHAMAN Central Mechanical AGUMENTATION OF GROUND WATER BASED BAIDYAPUR PWSS TO ACCOMMODATE FHTC IN KALNA-II BLOCK UNDER KALNA SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT (ZONE-I & ZONE-II) , SM/10032 Augmentation House wiring, double earthing and allied works for Baidyapur zone-1 Water Supply Scheme PH 1 replacement T.W (part-2) under CMD, PHE Dte., Dist.- Purba-Bardhaman ASSISTANT ENGINEER JUNIOR ENGINEER ORD/001674/2023-2024 80/CMSD 15/01/2024 12 SUBRATA BHADRA 0.97 0.00 0 100
5297 PURBA BARDHAMAN Burdwan Division AGUMENTATION OF GROUND WATER BASED BAIDYAPUR PWSS TO ACCOMMODATE FHTC IN KALNA-II BLOCK UNDER KALNA SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT (ZONE-I & ZONE-II) , SM/10032 Augmentation Work Order for "Restoration in pipe connection of Augmentation scheme of Baidyapur Zone-II Piped Water Supply Scheme under Kalna Sub-Division under Burdwan Division, PHE Dte." (SL-3) Assistant Engineer JUNIOR ENGINEER RWS KALNA2 ORD/001133/2023-2024 2062/KSD 23/02/2024 20 YOUNG ENGINEERS CO.-OPERATIVE SOCIETY LTD. 1.37 0.00 0 0
5298 PURBA BARDHAMAN Burdwan Division AGUMENTATION OF GROUND WATER BASED BAIDYAPUR PWSS TO ACCOMMODATE FHTC IN KALNA-II BLOCK UNDER KALNA SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT (ZONE-I & ZONE-II) , SM/10032 Augmentation Construction of switch rooms & Rising main at different TW site for Baidyapur (Zone-I) Piped Water Supply Scheme under Kalna - II Block, District:- Purba-Bardhaman under Burdwan Division, PHE. Dte. Assistant Engineer JUNIOR ENGINEER RWS KALNA2 ORD/000529/2023-2024 3626/BWD 21/08/2023 60 M/S UNIQUE 9.11 0.00 0 65
5299 PURBA BARDHAMAN Burdwan Division AGUMENTATION OF GROUND WATER BASED BAIDYAPUR PWSS TO ACCOMMODATE FHTC IN KALNA-II BLOCK UNDER KALNA SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT (ZONE-I & ZONE-II) , SM/10032 Augmentation Additional pipe laying of HDPE pipeline & providing FHTC work at Sanpukur, Mirhat village under BAIDYAPUR Water Supply Scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer JUNIOR ENGINEER RWS KALNA2 ORD/000871/2023-2024 5308/BWD 01/12/2023 30 GENUINE ENGINEERING CO-OP. SOCIETY LTD. 35.01 0.00 0 1
5300 PURBA BARDHAMAN Burdwan Division AGUMENTATION OF GROUND WATER BASED BAIDYAPUR PWSS TO ACCOMMODATE FHTC IN KALNA-II BLOCK UNDER KALNA SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT (ZONE-I & ZONE-II) , SM/10032 Augmentation Work Order for "Renovation of Pump House for Augmentation 1 of Baidyapur (Zone-II) Piped Water Supply Scheme within Kalna Sub-Division under Burdwan Division, PHE Dte." Assistant Engineer JUNIOR ENGINEER RWS KALNA2 ORD/001241/2023-2024 1953/KSD 05/02/2024 25 ER CONSTRUCTION & GENERAL ORDER SUPPLIER 0.59 0.00 0 100
5301 PURBA BARDHAMAN Central Mechanical AGUMENTATION OF GROUND WATER BASED BAIDYAPUR PWSS TO ACCOMMODATE FHTC IN KALNA-II BLOCK UNDER KALNA SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT (ZONE-I & ZONE-II) , SM/10032 Augmentation Quotation for new service connection at Baidyapur Zone-2 PWSS PH-3 BILL/00390/2024-2025 BP-2024-25-200 18/07/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 4.14 0.00 0 0
5302 PURBA BARDHAMAN Central Mechanical AGUMENTATION OF GROUND WATER BASED BAIDYAPUR PWSS TO ACCOMMODATE FHTC IN KALNA-II BLOCK UNDER KALNA SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT (ZONE-I & ZONE-II) , SM/10032 Augmentation Supply & Installation of Chlorination System for Tube well No.-1 at Baidyapur (zone-1) Water Supply Scheme under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/001863/2023-2024 461/CMSD 21/03/2024 12 SUDIKSHA CONSTRUCTION 0.96 0.00 0 100
5303 PURBA BARDHAMAN Burdwan Division AGUMENTATION OF GROUND WATER BASED BAIDYAPUR PWSS TO ACCOMMODATE FHTC IN KALNA-II BLOCK UNDER KALNA SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT (ZONE-I & ZONE-II) , SM/10032 Augmentation Augmentation of Baidyapur (Zone-I & II) Piped Water Supply Scheme with LDS, FHTC, Rising main, Construction of 200 cum capacity OHR with 20.0 mtr. Staging height inclusive of soil investigation including repairing of OHR, boundary walls & switch rooms under Kalna-II Block, District:- Purba-Burdwan. Assistant Engineer JUNIOR ENGINEER R.W.S. BURDWAN SUB-DIVISION PHE DTE ORD/000116/2022-2023 2859/BWD 22/06/2022 1229 SUPRITI ENTERPRISE 734.07 712.21 97.02 60
5304 PURBA BARDHAMAN Central Mechanical AGUMENTATION OF GROUND WATER BASED BAIDYAPUR PWSS TO ACCOMMODATE FHTC IN KALNA-II BLOCK UNDER KALNA SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT (ZONE-I & ZONE-II) , SM/10032 Augmentation Quotation for load enhancement at Baidyapur PH2 BILL/00810/2024-2025 BP-2024-25-302 24/09/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 5.35 0.00 0 0
5305 PURBA BARDHAMAN Burdwan Division AGUMENTATION OF GROUND WATER BASED BAIDYAPUR PWSS TO ACCOMMODATE FHTC IN KALNA-II BLOCK UNDER KALNA SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT (ZONE-I & ZONE-II) , SM/10032 Augmentation Different Types of work involved in connection with Augmentation of 6 Nos. [(SM/07827), (SM/07866), (SM/16196), (SM/18314), (SM/16021), (SM/16019)] Piped Water Supply Scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/001144/2024-2025 618/BWD 11/02/2025 180 M/S DATTA ENTERPRISE 578.09 0.00 0 0
5306 PURBA BARDHAMAN Burdwan Division AGUMENTATION OF GROUND WATER BASED BAIDYAPUR PWSS TO ACCOMMODATE FHTC IN KALNA-II BLOCK UNDER KALNA SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT (ZONE-I & ZONE-II) , SM/10032 Augmentation Supply of various D.I. Mechanical joints & specials for Aug. of SATGACHI & Aug. of BAIDYAPUR Piped W/S. Scheme within Kalna Sub-Division under Burdwan Division, PHE. Dte. [Part-B]. AE(HQs) JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000304/2024-2025 2827/BWD 19/07/2024 216 KEJRIWAL CASTINGS LIMITED 4.82 0.00 0 100
5307 PURBA BARDHAMAN Central Mechanical AGUMENTATION OF GROUND WATER BASED BAIDYAPUR PWSS TO ACCOMMODATE FHTC IN KALNA-II BLOCK UNDER KALNA SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT (ZONE-I & ZONE-II) , SM/10032 Augmentation Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.- 5 & 6 at Augumentation of BAIDYAPUR Water Supply Scheme [BLOCK- KALNA-2] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/001618/2023-2024 1542/CMD 05/03/2024 425 PROGRESSIVE ENGINEERS CO-OPERATIVE SOCIETY LIMITED 24.62 0.00 0 50
5308 PURBA BARDHAMAN Burdwan Division AGUMENTATION OF GROUND WATER BASED BAIDYAPUR PWSS TO ACCOMMODATE FHTC IN KALNA-II BLOCK UNDER KALNA SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT (ZONE-I & ZONE-II) , SM/10032 Augmentation Supply of various D.I. Mechanical joints & specials for Aug. of SATGACHI & Aug. of BAIDYAPUR Piped W/S. Scheme within Kalna Sub-Division under Burdwan Division, PHE. Dte. [Part-A]. AE(HQs) JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000315/2024-2025 2839/BWD 19/07/2024 215 ELECTROSTEEL CASTING LIMITED 4.95 0.00 0 100
5309 PURBA BARDHAMAN Burdwan Division AGUMENTATION OF GROUND WATER BASED BAIDYAPUR PWSS TO ACCOMMODATE FHTC IN KALNA-II BLOCK UNDER KALNA SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT (ZONE-I & ZONE-II) , SM/10032 Augmentation Supply of various D.I. Mechanical joints & specials for Aug. of SATGACHI & Aug. of BAIDYAPUR Piped W/S. Scheme within Kalna Sub-Division under Burdwan Division, PHE. Dte. [Part-C]. AE(HQs) JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000308/2024-2025 2831/BWD 19/07/2024 225 JINDAL SAW LTD. 4.63 0.00 0 100
5310 PURBA BARDHAMAN Burdwan Division Augmentation of ground water based piped water supply scheme for Barabelun to accommodated FHTC under Jal Sapno Mission under Bhatar Block. , SM/09700 Augmentation Supply of materials for different water supply scheme under Burdwan Division, PHE Dte. VCH/001578/2021-2022 1207/DW 10/03/2022 EXECUTIVE ENGINEER, RESOURCES DIVISION, P.H.E. DTE. 3,005.00 0.00 0 0
5311 PURBA BARDHAMAN Burdwan Division Augmentation of ground water based piped water supply scheme for Barabelun to accommodated FHTC under Jal Sapno Mission under Bhatar Block. , SM/09700 Augmentation Route Survey & Preparation of DPR for BARABELUN PWSS under Durgapur(Bardhaman North) Sub-Division under Burdwan Division PHE Dte.[SL-E] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000656/2021-2022 105/DSD 18/02/2022 15 RISHAN ENGINEERING CONSULTANCY 2.72 2.72 100 1
5312 PURBA BARDHAMAN Burdwan Division Augmentation of ground water based piped water supply scheme for Barabelun to accommodated FHTC under Jal Sapno Mission under Bhatar Block. , SM/09700 Augmentation Sinking of 300 X 200mm dia Tube Well 200 mtr. Depth by D.R. Rig method using UPVC pipe (CD) and UPVC Deep Well Screen (RDS) at 1st & 2nd Tubewell site for Augmentation of BAROBELUN Piped Water Supply Scheme, Block - Bhatar, Dist - Purba Bardhaman under Burdwan Division, PHE Dte. [2 Nos. GTW]. Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000013/2022-2023 1961/BWD 12/04/2022 45 ACME CONSTRUCTION 22.05 16.18 73.38 1
5313 PURBA BARDHAMAN Burdwan Division Augmentation of ground water based piped water supply scheme for Barabelun to accommodated FHTC under Jal Sapno Mission under Bhatar Block. , SM/09700 Augmentation New connection charges bill for Barabelun water supply scheme under Burdwan Division, PHE Dte.[Application No.-5003437581, Ref ID-503142125] VCH/000524/2022-2023 596/DW/22-23 21/09/2022 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LTD. 3.90 0.00 0 0
5314 PURBA BARDHAMAN Burdwan Division Augmentation of ground water based piped water supply scheme for Barabelun to accommodated FHTC under Jal Sapno Mission under Bhatar Block. , SM/09700 Augmentation Supply and delivery of different dia. CIDF sluice valve for Augmentation of Dignagar, Galsi, Barabelun & Kotachandipur Piped Water Supply Scheme within Durgapur (Burdwan North) Sub-Division under Burdwan Division, P.H.E. Dte. _2ND CALL Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000311/2022-2023 3624/BWD 22/08/2022 20 SSPR VALVE MANUFACTURING PVT LTD. 14.76 0.00 0 1
5315 PURBA BARDHAMAN Burdwan Division Augmentation of ground water based piped water supply scheme for Barabelun to accommodated FHTC under Jal Sapno Mission under Bhatar Block. , SM/09700 Augmentation Quotation for new connection charges of Augmentation of Barbelun w/s scheme under Burdwan Division, PHE Dte. T.W. No.-4 [Memo No.-5003603611/Quot/03, dt.-10/02/2023][App No.-5003603611, Ref. ID-503282585] BILL/00291/2022-2023 1115/JJM 27/02/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LTD. 2.40 0.00 0 0
5316 PURBA BARDHAMAN Central Mechanical Augmentation of ground water based piped water supply scheme for Barabelun to accommodated FHTC under Jal Sapno Mission under Bhatar Block. , SM/09700 Augmentation Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Augmentation of Barabelun Water Supply Scheme [ Block- Bhatar ] at 1st Tube well Site( Tube well No.-3) at under CMD, PHE Dte., Dist.- Purba-Bardhaman ASSISTANT ENGINEER ORD/000619/2022-2023 2095/CMD 08/09/2022 30 ELECTRICAL & MECHANICAL ENGINEERING CORPORATION 10.90 10.57 96.97 0
5317 PURBA BARDHAMAN Central Mechanical Augmentation of ground water based piped water supply scheme for Barabelun to accommodated FHTC under Jal Sapno Mission under Bhatar Block. , SM/09700 Augmentation Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Augmentation of Barabelun Water Supply Scheme [ Block- Bhatar ] at 2nd Tube well Site( Tube well No.-4) at under CMD, PHE Dte., Dist.- Purba-Bardhaman ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000621/2022-2023 2094/CMD 08/09/2022 30 M/S. SWAPAN BANERJEE 11.40 11.14 97.72 100
5318 PURBA BARDHAMAN Burdwan Division Augmentation of ground water based piped water supply scheme for Barabelun to accommodated FHTC under Jal Sapno Mission under Bhatar Block. , SM/09700 Augmentation Augmentation of BARABELUN Piped Water Supply Scheme with LDS, FHTC work, Rising Main, Switch Room (with water supply & sanitary arrangements), 400 Cum capacity OHR with 20.0 Mtr. Staging height inclusive of soil test & Boundary wall construction (HW, 2nd TW & 4th TW Site) with repairing of switch room cum chlorine room, Block - Bhatar, Dist. - Purba Bardhaman under Burdwan Division, PHE. Dte. Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000423/2021-2022 571/BWD 27/01/2022 360 MD HASIN 406.41 385.05 94.74 100
5319 PURBA BARDHAMAN Burdwan Division Augmentation of ground water based piped water supply scheme for Barabelun to accommodated FHTC under Jal Sapno Mission under Bhatar Block. , SM/09700 Augmentation Material Requisition To Resource Division RTOR000026/2021-2022 556/BWD 27/01/2022 Resource Division 13.64 0.00 0 0
5320 PURBA BARDHAMAN Burdwan Division Augmentation of ground water based piped water supply scheme for Barabelun to accommodated FHTC under Jal Sapno Mission under Bhatar Block. , SM/09700 Augmentation Material Requisition To Resource Division RTOR000101/2021-2022 770/BWD 07/02/2022 Resource Division 26.55 0.00 0 0
5321 PURBA BARDHAMAN Burdwan Division Augmentation of ground water based piped water supply scheme for Barabelun to accommodated FHTC under Jal Sapno Mission under Bhatar Block. , SM/09700 Augmentation Material Requisition To Resource Division RTOR000236/2021-2022 1560/BWD 15/03/2022 Resource Division 0.37 0.00 0 0
5322 PURBA BARDHAMAN Burdwan Division Augmentation of ground water based piped water supply scheme for Barabelun to accommodated FHTC under Jal Sapno Mission under Bhatar Block. , SM/09700 Augmentation Material Requisition To Resource Division RTOR000186/2021-2022 1381/BWD 09/03/2022 Resource Division 4.35 0.00 0 0
5323 PURBA BARDHAMAN Burdwan Division Augmentation of ground water based piped water supply scheme for Barabelun to accommodated FHTC under Jal Sapno Mission under Bhatar Block. , SM/09700 Augmentation Material Requisition To Resource Division RTOR000168/2021-2022 1328/BWD 08/03/2022 Resource Division 39.89 0.00 0 0
5324 PURBA BARDHAMAN Burdwan Division Augmentation of ground water based piped water supply scheme for Barabelun to accommodated FHTC under Jal Sapno Mission under Bhatar Block. , SM/09700 Augmentation Material Requisition To Resource Division RTOR000046/2022-2023 4854/BWD 20/10/2022 Resource Division 6.16 0.00 0 0
5325 PURBA BARDHAMAN Burdwan Division Augmentation of ground water based piped water supply scheme for Barabelun to accommodated FHTC under Jal Sapno Mission under Bhatar Block. , SM/09700 Augmentation Beautification of PWSS with Arboriculture, Recharge Pit including shaft at Head Works site and anciliary works at 1st & 4th Tubewell site of BARABELUN (Bhatar Block) P.W.S.S under Burdwan Division, PHE Dte. ASSISTANT ENGINEER R.W.S. BURDWAN SUB-DIVISION PHE DTE JUNIOR ENGINEER DURGAPUR SUB-DIVISION PHE DTE,Junior Engineer2, Durgapur Sub-Division, PHE Dte. ORD/000367/2024-2025 238/RWS 30/07/2024 10 GHOSH ENTERPRISE 0.97 0.00 0 0
5326 PURBA BARDHAMAN Burdwan Division Augmentation of ground water based piped water supply scheme for Barabelun to accommodated FHTC under Jal Sapno Mission under Bhatar Block. , SM/09700 Augmentation Making connection with 4th tube well, Construction of Plinth protection of OHR, Restoration of road and FHTC (The rest portion) of Bara Belun Water Supply Scheme at Bara Belun village & Providing Functional Household Tap Connection (FHTC) within the command area of NASIGRAM Piped W/S. Scheme within Bhatar Block under Burdwan Division, PHE. Dte. Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer2, Durgapur Sub-Division, PHE Dte. ORD/000690/2024-2025 3685/BWD 23/10/2024 120 INDIAN ENGINEERS CO.-OPERATIVE SOCIETY LTD. 91.48 0.00 0 0
5327 PURBA BARDHAMAN Burdwan Division Augmentation of ground water based piped water supply scheme for Barabelun to accommodated FHTC under Jal Sapno Mission under Bhatar Block. , SM/09700 Augmentation Providing Functional Household Tap Connection (FHTC)from distribution system within the command area of Barobelun water supply scheme at Baneswarpur village under JJM under Bhatar Block in Purba Bardhanan District undrer Burdwan Division, P.H.E. Dte. Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer2, Durgapur Sub-Division, PHE Dte. ORD/001019/2023-2024 130/DSD 07/02/2024 45 JAMALUDDIN SK 3.02 1.57 51.99 100
5328 PURBA BARDHAMAN Burdwan Division Augmentation of ground water based piped water supply scheme for Barabelun to accommodated FHTC under Jal Sapno Mission under Bhatar Block. , SM/09700 Augmentation Providing Functional Household Tap Connection (FHTC)from distribution system within the command area of Barobelun water supply scheme at Khulla village under JJM under Bhatar Block in Purba Bardhanan District undrer Burdwan Division, P.H.E. Dte. Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer2, Durgapur Sub-Division, PHE Dte. ORD/001020/2023-2024 131/DSD 07/02/2024 45 JAMALUDDIN SK 1.81 0.01 0.55 100
5329 PURBA BARDHAMAN Burdwan Division Augmentation of ground water based piped water supply scheme for Barabelun to accommodated FHTC under Jal Sapno Mission under Bhatar Block. , SM/09700 Augmentation Land development and beautification with plant and Construction of connecting road from Gate to Pumphouse, OHR at 1st tubewell site of Barobelun Water Supply Scheme within Durgapur Sub Division Under Burdwan Division, PHE Dte. Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer2, Durgapur Sub-Division, PHE Dte. ORD/000986/2023-2024 42/DSD 17/01/2024 366 MUNSHI JAVEDUR JAMAN 4.82 1.28 26.56 72
5330 PURBA BARDHAMAN Burdwan Division Augmentation of ground water based piped water supply scheme for Barabelun to accommodated FHTC under Jal Sapno Mission under Bhatar Block. , SM/09700 Augmentation Laying of HDPE pipe line at Baneswarpur near Barabelun Bazar under Barabelun PWSS within ,Durgapur (Burdwan North) Sub-Division under Burdwan Division, PHE Dte. (2nd Call) JUNIOR ENGINEER DURGAPUR SUB-DIVISION PHE DTE ORD/001304/2024-2025 383/DSD 10/03/2025 30 GHOSH ENTERPRISE 0.80 0.00 0 0
5331 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Mondalgram Piped Water Supply Scheme , SM/07822 Retrofitting Extension of UPVC water supply line for Mondalgram and its adjoining mouzas W/S. Scheme within Memari- II Block, under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000614/2021-2022 1576/BWD 16/03/2022 30 PAPRI HAZRA 10.41 8.28 79.54 1
5332 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Mondalgram Piped Water Supply Scheme , SM/07822 Retrofitting Sinking of 300 X 200mm dia Tube Well 150 mtr. Depth by D.R. Rig method using UPVC pipe (CM) and UPVC Medium Well Screen (RMS) of MONDALGRAM & its adjoining mouzas Piped Water Supply Scheme, Block ? Memari ? II, Dist - Purba Bardhaman under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000554/2022-2023 5196/BWD 24/11/2022 30 ANIRUDDHA FARUQUE 11.24 9.82 87.37 1
5333 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Mondalgram Piped Water Supply Scheme , SM/07822 Retrofitting Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of Mondalgram Piped Water Supply Scheme at Mondalgram (10 Nos Habitation) Village (Mouza), Memari-II Block under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000111/2021-2022 3879/BWD 27/07/2021 60 SUPRIYA RAY 102.04 82.29 80.64 1
5334 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Mondalgram Piped Water Supply Scheme , SM/07822 Retrofitting Quotation of New connection charges at Augmentation of Mondalgram water supply scheme. [Application No.-5003701437] BILL/00065/2023-2024 152/JJM 26/05/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LTD. 0.64 0.00 0 0
5335 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Mondalgram Piped Water Supply Scheme , SM/07822 Retrofitting Additional quotation for Untia PHE of Augmentation of Mondalgram water supply scheme.[Memo No.-SGA/ADDL/QUOTI, Dated-21/06/23] BILL/00239/2023-2024 358/JJM 14/07/2023 WEST BENGAL BUILDING AND OTHER CONSTRUCTION WORKERS WELFARE FUND 2.16 0.00 0 0
5336 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Mondalgram Piped Water Supply Scheme , SM/07822 Retrofitting Construction of Pump House cum chlorine room without sanitary and water supply arrangement at Tube Well Site to departmental drawing no-PHE/BD/P.H/DRG/02/DEC-17(Size 3.60 mtr x 3.00 mtr room) for MONDALGRAM its Adjoining Mouza W/S Scheme, Block -Memari-II within Burdwan Sub-Division, PHE Dte. (Mouza- Untia) Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER RWS BURDWAN SUB-DIVISION PHE DTE ORD/000840/2022-2023 508/BSD 21/03/2023 45 NARSAD SAIKH 3.12 2.55 81.73 100
5337 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Mondalgram Piped Water Supply Scheme , SM/07822 Retrofitting Left out Functional House hold Tap Connection (FHTC) for MONDALGRAM and its adjoining Mouza W/S Scheme, block ¿Memari II within Burdwan Sub-Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER RWS BURDWAN SUB-DIVISION PHE DTE ORD/000773/2022-2023 1326/BWD 22/03/2023 60 DEBASHISH ENTERPRISE 30.33 0.00 0 35
5338 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Mondalgram Piped Water Supply Scheme , SM/07822 Retrofitting Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of MONDALGRAM Piped Water Supply Scheme at Bamunia (Part) (4 Nos. Habs.), Bhigobanpur, Halaodharpur (Part) (2 Nos. Habs.), Mondalgram (Part) (10 Nos. Habs.), Saragachi & Malamba Village (Mouza), Memari - II Block under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000479/2021-2022 994/BWD 21/02/2022 60 SUPRIYA RAY 61.24 37.71 61.58 70
5339 PURBA BARDHAMAN Ausgram - I Burdwan Division SILUT PIPED WATER SUPPLY SCHEME , SM/13903 New Material Requisition To Resource Division RTOR000035/2023-2024 1962/BWD 25/04/2023 Resource Division 69.42 0.00 0 0
5340 PURBA BARDHAMAN Ausgram - I Burdwan Division SILUT PIPED WATER SUPPLY SCHEME , SM/13903 New Material Requisition To Resource Division RTOR000322/2023-2024 2197/BWD 12/05/2023 Resource Division 4.36 0.00 0 0
5341 PURBA BARDHAMAN Ausgram - I Burdwan Division SILUT PIPED WATER SUPPLY SCHEME , SM/13903 New Material Requisition To Resource Division RTOR000592/2023-2024 4900/BWD 10/11/2023 Resource Division 34.27 0.00 0 0
5342 PURBA BARDHAMAN Ausgram - I Central Mechanical SILUT PIPED WATER SUPPLY SCHEME , SM/13903 New Quotation for new service connection at Silut W/S Scheme for PH No-1 BILL/01819/2023-2024 BP-2023-24-327 03/01/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 13.07 0.00 0 0
5343 PURBA BARDHAMAN Ausgram - I Central Mechanical SILUT PIPED WATER SUPPLY SCHEME , SM/13903 New Quotation for new service connection at Silut PWSS PH-2. BILL/00433/2024-2025 BP-2024-25-234 30/07/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.65 0.00 0 0
5344 PURBA BARDHAMAN Ausgram - I Central Mechanical SILUT PIPED WATER SUPPLY SCHEME , SM/13903 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Pichkuri, karatia & others water supply scheme under Ausgram-1 Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman Driller In-Charge JUNIOR ENGINEER ORD/000398/2024-2025 2764/CMD 26/09/2024 90 JAL PRAVAHIKA PVT LTD 52.55 0.00 0 0
5345 PURBA BARDHAMAN Ausgram - I Central Mechanical SILUT PIPED WATER SUPPLY SCHEME , SM/13903 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at Silut Water Supply Scheme [ Block- Ausgram-1 ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. Driller In-Charge JUNIOR ENGINEER ORD/001039/2023-2024 4179/CMD 29/08/2023 580 SOUMEN ELECTRIC 27.67 0.00 0 48
5346 PURBA BARDHAMAN Ausgram - I Burdwan Division SILUT PIPED WATER SUPPLY SCHEME , SM/13903 New Sinking of Tube-wells, LDS, Rising Main, FHTC, Construction of 350 cum capacity RCC OHR with 20.0 mtr. with Staging height including soil investigation, construction of switch rooms, boundary walls with gates, land development, internal drains and internal pathways at different TW sites for SILUT Piped Water Supply Scheme under Ausgram-I Block, District:- Purba Bardhaman [NEW SCHEME] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer1, Durgapur Sub-Division, PHE Dte. ORD/000424/2023-2024 3323/BWD 02/08/2023 365 TAAS ENTERPRISE 474.73 0.00 0 50
5347 PURBA BARDHAMAN Ausgram - I Durgapur W/S Division SILUT PIPED WATER SUPPLY SCHEME , SM/13903 New Material Requisition To Resource Division RTOR000054/2024-2025 474/DWSD 17/03/2025 Resource Division 0.14 0.00 0 0
5348 PURBA BARDHAMAN Memari - II Burdwan Division NOAHATI PIPED WATER SUPPLY SCHEME , SM/13452 New Material Requisition To Resource Division RTOR000073/2022-2023 1247/BWD 17/03/2023 Resource Division 11.94 0.00 0 0
5349 PURBA BARDHAMAN Memari - II Central Mechanical NOAHATI PIPED WATER SUPPLY SCHEME , SM/13452 New New service connection charges for Noahati PWSS TW-1 BILL/00770/2023-2024 BP-2023-24-74 21/07/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 4.87 0.00 0 0
5350 PURBA BARDHAMAN Memari - II Central Mechanical NOAHATI PIPED WATER SUPPLY SCHEME , SM/13452 New New service connection charges for Noahati PWSS TW-2 BILL/00771/2023-2024 BP-2023-24-75 21/07/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.17 0.00 0 0
5351 PURBA BARDHAMAN Memari - II Burdwan Division NOAHATI PIPED WATER SUPPLY SCHEME , SM/13452 New Material Requisition To Resource Division RTOR000465/2023-2024 3989/BWD 08/09/2023 Resource Division 2.90 0.00 0 0
5352 PURBA BARDHAMAN Memari - II Burdwan Division NOAHATI PIPED WATER SUPPLY SCHEME , SM/13452 New Material Requisition To Resource Division RTOR000683/2023-2024 5056/BWD 23/11/2023 Resource Division 20.46 0.00 0 0
5353 PURBA BARDHAMAN Memari - II Central Mechanical NOAHATI PIPED WATER SUPPLY SCHEME , SM/13452 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at Noahati Water Supply Scheme [ Block- Memari-2 ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER Junior Engineer ORD/000138/2023-2024 2819/CMD 04/07/2023 30 M/S. S.R. ENTERPRISE 29.40 23.03 78.33 100
5354 PURBA BARDHAMAN Memari - II Central Mechanical NOAHATI PIPED WATER SUPPLY SCHEME , SM/13452 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at NOAHATI & others water supply scheme under Memari-II Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. ASSISTANT ENGINEER Junior Engineer ORD/000102/2024-2025 2395/CMD 02/08/2024 90 S.G. TECHNICAL SERVICES 36.99 0.00 0 0
5355 PURBA BARDHAMAN Memari - II Burdwan Division NOAHATI PIPED WATER SUPPLY SCHEME , SM/13452 New Different works related (sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of different capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site) to KUCHUT & NOAHATI Piped Water Supply Scheme under Memari - II Block, District:- Purba Bardhaman [NEW SCHEME] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000750/2022-2023 1172/BWD 14/03/2023 659 NATIONAL CONSTRUCTION 831.75 0.00 0 99
5356 PURBA BARDHAMAN Memari - II Burdwan Division NOAHATI PIPED WATER SUPPLY SCHEME , SM/13452 New Repairing damaged Pipeline & concrete road by Cement concrete (mix 1:1.5:3) and drainage system, Sluice valve chamber for FHTC work for SATGACHIA ZONE-I, SATGACHIA ZONE-II, SRIDHARPUR, PARHATI, KUCHUT, NOAHATI, MONDALGRAM PWSS and its adjoining mouzas within MEMARI-II BLOCK under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000283/2024-2025 2715/BWD 11/07/2024 205 A.R. TRADERS 74.28 0.00 0 30
5357 PURBA BARDHAMAN Memari - II Burdwan Division NOAHATI PIPED WATER SUPPLY SCHEME , SM/13452 New Different Types of work involved in connection with different New Schemes (05 Nos.) Piped Water Supply Scheme under Memari II Block within Burdwan Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000003/2025-2026 1116/BWD 03/04/2025 120 SOFIQUL ISLAM 176.89 0.00 0 0
5358 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Bahirghanya Piped Water Supply Scheme at Galsi-II Block , SM/07870 Retrofitting Laying parallel pipeline to increase the water supply towards Kalyanpur [ Node No-146 t0 100 ] of BAHIRGHANNYA and its adjoining mouza's Piped W/S Scheme at Galsi-II Block within Durgapur Sub Division under Burdwan Division, P.H.E. Dte. [Gr.-B] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000130/2022-2023 343/DSD 30/06/2022 30 SUPRIYA RAY 4.89 0.00 0 1
5359 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Bahirghanya Piped Water Supply Scheme at Galsi-II Block , SM/07870 Retrofitting Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of Bahirgannya piped water supply scheme at Bahirgannya (04 Nos. habitation Part), Askaran (02 Nos. habitation), Brindabanpur (02 Nos. Habitation), Kurkuba (03 Nos Habitation) & Srirampur (02 Nos. Habitation) village, Galsi-II Block under Burdwan Division, PHE Dte. Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000564/2020-2021 5006/BWD 10/12/2020 90 SUPRIYA RAY 99.82 43.43 43.51 1
5360 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Bahirghanya Piped Water Supply Scheme at Galsi-II Block , SM/07870 Retrofitting Shifting of pipeline for Strengthening work of Anandabazar-Galsi via Sar Road under Asansol Highway Division P.W. (Roads) [Node No- 6-7-8-9-10] and restore damage pipeline at Askaran village due to construction of drain by the Kurkuba GP of BAHIRGHANNYA and its adjoining mouza's Piped W/S Scheme at Galsi-II Block within Durgapur Sub Division under Burdwan Division, P.H.E. Dte. Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000002/2023-2024 1604/BWD 05/04/2023 57 SUPRIYA RAY 16.60 0.00 0 100
5361 PURBA BARDHAMAN Purbasthali - I Burdwan Division KARAIL PIPED WATER SUPPLY SCHEME , SM/13498 New Material Requisition To Resource Division RTOR000310/2023-2024 2197/BWD 12/05/2023 Resource Division 19.71 0.00 0 0
5362 PURBA BARDHAMAN Purbasthali - I Central Mechanical KARAIL PIPED WATER SUPPLY SCHEME , SM/13498 New Supply & Installation of Submersible Pumping Machinery , Voltage Stabilizer, Chlorination system and internal House wiring for Tube well no.- 1 & 2 at KARAIL Water Supply Scheme [Block - PURBASTHALI-1] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000827/2023-2024 4104/CMD 29/08/2023 30 PADMA ENGINEERING CO. 20.80 0.00 0 0
5363 PURBA BARDHAMAN Purbasthali - I Burdwan Division KARAIL PIPED WATER SUPPLY SCHEME , SM/13498 New Land demarcation and preparation of sketch map for Haldi, Sultanpur, Berugram & Karail Piped W/S. Scheme (New Scheme) at different Blocks under JJM under Burdwan Division, PHE Dte. AE(HQs) J.E. 1 BURDWAN ORD/000756/2023-2024 842/AE/HQ 01/11/2023 15 M/S S. CHOUDHURY 0.33 0.00 0 100
5364 PURBA BARDHAMAN Purbasthali - I Central Mechanical KARAIL PIPED WATER SUPPLY SCHEME , SM/13498 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Haripur & others water supply scheme under purbasthali 1 Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000072/2024-2025 2397/CMD 02/08/2024 90 CHATTERJEE ENTERPRISE 48.60 0.00 0 0
5365 PURBA BARDHAMAN Purbasthali - I Central Mechanical KARAIL PIPED WATER SUPPLY SCHEME , SM/13498 New Quotation for new service connection at Karail PH-1 PWSS BILL/00811/2024-2025 BP-2024-25-307 24/09/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 9.51 0.00 0 0
5366 PURBA BARDHAMAN Purbasthali - I Burdwan Division KARAIL PIPED WATER SUPPLY SCHEME , SM/13498 New KARAIL Piped Water Supply Scheme with sinking of Tube-well, LDS, Rising Main, FHTC with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drain and internal pathway at different TW site under Purbasthali-I Block, District:- Purba-Bardhaman [NEW SCHEME]. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/001010/2023-2024 345/BWD 25/01/2024 120 T.K. BANERJEE & CO. 59.45 0.00 0 30
5367 PURBA BARDHAMAN Ausgram - I Burdwan Division SHIBADA PIPED WATER SUPPLY SCHEME , SM/13492 New Material Requisition To Resource Division RTOR000033/2023-2024 1962/BWD 25/04/2023 Resource Division 4.95 0.00 0 0
5368 PURBA BARDHAMAN Ausgram - I Burdwan Division SHIBADA PIPED WATER SUPPLY SCHEME , SM/13492 New Material Requisition To Resource Division RTOR000307/2023-2024 2197/BWD 12/05/2023 Resource Division 15.17 0.00 0 0
5369 PURBA BARDHAMAN Ausgram - I Burdwan Division SHIBADA PIPED WATER SUPPLY SCHEME , SM/13492 New Material Requisition To Resource Division RTOR000610/2023-2024 4915/BWD 10/11/2023 Resource Division 16.68 0.00 0 0
5370 PURBA BARDHAMAN Ausgram - I Central Mechanical SHIBADA PIPED WATER SUPPLY SCHEME , SM/13492 New New service connection charges for Shibada PWSS TW-1 BILL/01706/2023-2024 BP-2023-24-232 20/11/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 9.08 0.00 0 0
5371 PURBA BARDHAMAN Ausgram - I Central Mechanical SHIBADA PIPED WATER SUPPLY SCHEME , SM/13492 New NEW SERVICE CONNECTION FOR SHIBDA PWSS BILL/02469/2023-2024 BP-2023-24-528 13/02/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 16.79 0.00 0 0
5372 PURBA BARDHAMAN Ausgram - I Burdwan Division SHIBADA PIPED WATER SUPPLY SCHEME , SM/13492 New Repairing of Sajaldhara pipeline(Colony para Uttar) for SIBDA Water Supply Scheme of Aushgram-I Block,under Burdwan Division, PHE Dte. Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer1, Durgapur Sub-Division, PHE Dte. ORD/001102/2023-2024 236/DSD 12/03/2024 15 ONKAR ENTERPRISE 0.97 0.00 0 100
5373 PURBA BARDHAMAN Ausgram - I Central Mechanical SHIBADA PIPED WATER SUPPLY SCHEME , SM/13492 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at Shibada Water Supply Scheme [ Block- Ausgram-1 ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. Driller In-Charge JUNIOR ENGINEER ORD/000685/2023-2024 4014/CMD 29/08/2023 30 S.P. CONSTRUCTION 29.59 0.00 0 48
5374 PURBA BARDHAMAN Ausgram - I Burdwan Division SHIBADA PIPED WATER SUPPLY SCHEME , SM/13492 New Sinking of Tube-wells, LDS, Rising Main, FHTC, Construction of 200 cum capacity RCC OHR with 20.0 mtr. with Staging height including soil investigation, construction of switch rooms, boundary walls with gates, land development, internal drains and internal pathways at different TW sites for SHIBADA Piped Water Supply Scheme under Ausgram-I Block, District:- Purba Bardhaman [NEW SCHEME] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer1, Durgapur Sub-Division, PHE Dte. ORD/000392/2023-2024 3218/BWD 25/07/2023 365 ONKAR ENTERPRISE 319.96 58.90 18.41 71
5375 PURBA BARDHAMAN Ausgram - I Central Mechanical SHIBADA PIPED WATER SUPPLY SCHEME , SM/13492 New Additional quotation for new service connection at Shibda PWSS PH-2 BILL/00286/2024-2025 BP-2024-25-136 11/06/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.35 0.00 0 0
5376 PURBA BARDHAMAN Ausgram - I Central Mechanical SHIBADA PIPED WATER SUPPLY SCHEME , SM/13492 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at SAHAPUR & others water supply scheme under Memari-I Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. ASSISTANT ENGINEER Junior Engineer ORD/000100/2024-2025 2392/CMD 02/08/2024 90 MITRA ENTERPRISE 47.62 0.00 0 0
5377 PURBA BARDHAMAN Ausgram - I Burdwan Division SHIBADA PIPED WATER SUPPLY SCHEME , SM/13492 New Sajaldhara pipeline(Colony para Dakshin) for SIBDA Water Supply Scheme of Aushgram-I Block,under Burdwan Division, PHE Dte. Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer1, Durgapur Sub-Division, PHE Dte. ORD/001250/2023-2024 242/DSD 12/03/2024 15 ONKAR ENTERPRISE 0.98 0.00 0 0
5378 PURBA BARDHAMAN Ausgram - I Central Mechanical SHIBADA PIPED WATER SUPPLY SCHEME , SM/13492 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Pichkuri, karatia & others water supply scheme under Ausgram-1 Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman Driller In-Charge JUNIOR ENGINEER ORD/000398/2024-2025 2764/CMD 26/09/2024 90 JAL PRAVAHIKA PVT LTD 52.55 0.00 0 0
5379 PURBA BARDHAMAN Ausgram - I Durgapur W/S Division SHIBADA PIPED WATER SUPPLY SCHEME , SM/13492 New Material Requisition To Resource Division RTOR000014/2024-2025 1724/E/DWSD 10/12/2024 Resource Division 3.95 0.00 0 0
5380 PURBA BARDHAMAN Ausgram - I Durgapur W/S Division SHIBADA PIPED WATER SUPPLY SCHEME , SM/13492 New FORMAL WORK ORDER FOR Balance and additional works for sinking of 300X200 mm dia X 210 mtr deapth RRM Tube well and laying pipe line (LDS),FHTC, Construction of Switch Room,Pump House,Inter Connection along with road restoration and construction of Boundary wall for head worksites and other allieds work related to JJM (7 Nos PWSS) i.e. Aushgram PWSS, Jalkandar and Bhuyera PWSS, Karatia PWSS, Khandari PWSS, Pichkuri PWSS, Shibda PWSS under Aushgram-I and II,Galsi-I and II Block under DURGAPUR W/S DIVISION,PHE Dte. Assistant Engineer-I,Assistant Engineer-II Contractual Junior Engineer_1,Contractual Junior Engineer_2,Contractual Junior Engineer_3,Contractual Junior Engineer_4,Contractual Junior Engineer_5,JUNIOR ENGINEER-1,JUNIOR ENGINEER-2,Junior Engineer_3 ORD/000286/2024-2025 493/DWSD 19/03/2025 185 MANASH GHOSH 745.87 0.00 0 0
5381 PURBA BARDHAMAN Ausgram - II Burdwan Division SONAIAIMA Purba Piped Water Supply Scheme , SM/13326 New Material Requisition To Resource Division RTOR000078/2022-2023 1255/BWD 17/03/2023 Resource Division 8.72 0.00 0 0
5382 PURBA BARDHAMAN Ausgram - II Burdwan Division SONAIAIMA Purba Piped Water Supply Scheme , SM/13326 New Material Requisition To Resource Division RTOR000093/2022-2023 1629/BWD 06/04/2023 Resource Division 0.41 0.00 0 0
5383 PURBA BARDHAMAN Ausgram - II Central Mechanical SONAIAIMA Purba Piped Water Supply Scheme , SM/13326 New New service connection charges for Sonaiaima PWSS TW-1 BILL/00720/2023-2024 BP-2023-24-46 13/07/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 7.13 0.00 0 0
5384 PURBA BARDHAMAN Ausgram - II Central Mechanical SONAIAIMA Purba Piped Water Supply Scheme , SM/13326 New New service connection charges for Sonaiaima PWSS TW-2 BILL/00775/2023-2024 BP-2023-24-99 02/08/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 5.06 0.00 0 0
5385 PURBA BARDHAMAN Ausgram - II Burdwan Division SONAIAIMA Purba Piped Water Supply Scheme , SM/13326 New Material Requisition To Resource Division RTOR000635/2023-2024 5091/BWD 23/11/2023 Resource Division 21.70 0.00 0 0
5386 PURBA BARDHAMAN Ausgram - II Central Mechanical SONAIAIMA Purba Piped Water Supply Scheme , SM/13326 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Chora, Kalaijhuti & others water supply scheme under Ausgram-2 Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. Driller In-Charge JUNIOR ENGINEER ORD/000143/2024-2025 2405/CMD 02/08/2024 90 NABAUDYOG ELECTRICAL ENGINEERING CO-OPERATIVE SOCIETY LTD 95.26 0.00 0 0
5387 PURBA BARDHAMAN Ausgram - II Central Mechanical SONAIAIMA Purba Piped Water Supply Scheme , SM/13326 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at Sonaiaima Water Supply Scheme [ Block- Ausgram-2 ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. Driller In-Charge JUNIOR ENGINEER ORD/000041/2023-2024 2493/CMD 01/06/2023 30 CHATTERJEE ENTERPRISE 27.71 15.92 57.45 40
5388 PURBA BARDHAMAN Ausgram - II Durgapur W/S Division SONAIAIMA Purba Piped Water Supply Scheme , SM/13326 New Material Requisition To Resource Division RTOR000017/2024-2025 1724/B/DWSD 10/12/2024 Resource Division 7.42 0.00 0 0
5389 PURBA BARDHAMAN Ausgram - II Burdwan Division SONAIAIMA Purba Piped Water Supply Scheme , SM/13326 New SONAIAIMA Piped Water Supply Scheme with sinking of Tube-well, LDS, Rising Main, FHTC, Construction of 200 cum capacity RCC OHR with 20.0 mtr. with Staging height including soil investigation & construction of switch-rooms & boundary walls at different TW site under AUSGRAM-II Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000639/2022-2023 254/BWD 16/01/2023 806 RANADHIR SINHA 360.13 150.05 41.67 100
5390 PURBA BARDHAMAN Ausgram - II Burdwan Division SONAIAIMA Purba Piped Water Supply Scheme , SM/13326 New Ground development at Head Work site of SONAIAIMA Piped water supply Scheme, block ¿ Ausgram - I within Durgapur Sub Division under Burdwan Division P.H.E. Dte. Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000676/2023-2024 723/DSD 21/09/2023 30 SINHA BROTHERS 0.94 0.00 0 100
5391 PURBA BARDHAMAN Ausgram - II Burdwan Division SONAIAIMA Purba Piped Water Supply Scheme , SM/13326 New Repairing and restore pipe line damaged by newly laying of pipeline at different location of Somai village (West Part) SONAIAIMA and its adjoining mouza's Piped W/S Scheme (NEW) at Ausgram-II Block within Durgapur Sub Division under Burdwan Division, P.H.E. Dte. Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000675/2023-2024 722/DSD 21/09/2023 15 RANADHIR SINHA 0.87 0.00 0 100
5392 PURBA BARDHAMAN Ausgram - II Burdwan Division SONAIAIMA Purba Piped Water Supply Scheme , SM/13326 New Repairing and restore pipe line damaged by newly laying of pipeline at different location of Somai village ( East Part) SONAIAIMA and its adjoining mouza's Piped W/S Scheme (NEW) at Ausgram-II Block within Durgapur Sub Division under Burdwan Division, P.H.E. Dte. Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000673/2023-2024 721/DSD 21/09/2023 15 RANADHIR SINHA 0.86 0.00 0 100
5393 PURBA BARDHAMAN Ausgram - II Durgapur W/S Division SONAIAIMA Purba Piped Water Supply Scheme , SM/13326 New Material Requisition To Resource Division RTOR000038/2024-2025 458/DWSD 17/03/2025 Resource Division 0.14 0.00 0 0
5394 PURBA BARDHAMAN Ausgram - II Durgapur W/S Division SONAIAIMA Purba Piped Water Supply Scheme , SM/13326 New FOMAL WORK ORDER FOR Balance works related (Sinking of Tube Wells at Bilaspur Village, LDS, Rising Mains, FHTCs, Road restoration of Sonaiaima PWSS under Ausgram-II Block under Durgapur W/S Division, PHE Dte. Assistant Engineer-II Contractual Junior Engineer_2 ORD/000221/2024-2025 128/DWSD 22/01/2025 120 RANADHIR SINHA 131.08 0.00 0 30
5395 PURBA BARDHAMAN Ausgram - I Burdwan Division DIGHA PIPED WATER SUPPLY SCHEME , SM/13938 New Material Requisition To Resource Division RTOR000022/2023-2024 1962/BWD 25/04/2023 Resource Division 55.76 0.00 0 0
5396 PURBA BARDHAMAN Ausgram - I Burdwan Division DIGHA PIPED WATER SUPPLY SCHEME , SM/13938 New Material Requisition To Resource Division RTOR000245/2023-2024 2197/BWD 12/05/2023 Resource Division 12.65 0.00 0 0
5397 PURBA BARDHAMAN Ausgram - I Burdwan Division DIGHA PIPED WATER SUPPLY SCHEME , SM/13938 New Material Requisition To Resource Division RTOR000449/2023-2024 3973/BWD 08/09/2023 Resource Division 29.28 0.00 0 0
5398 PURBA BARDHAMAN Ausgram - I Burdwan Division DIGHA PIPED WATER SUPPLY SCHEME , SM/13938 New Material Requisition To Resource Division RTOR000587/2023-2024 4944/BWD 10/11/2023 Resource Division 34.27 0.00 0 0
5399 PURBA BARDHAMAN Ausgram - I Central Mechanical DIGHA PIPED WATER SUPPLY SCHEME , SM/13938 New NEW SERVICE CONNECTION FOR DIGHA PWSS BILL/02588/2023-2024 BP-2023-24-554 20/02/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.08 0.00 0 0
5400 PURBA BARDHAMAN Ausgram - I Central Mechanical DIGHA PIPED WATER SUPPLY SCHEME , SM/13938 New NEW SERVICE CONNECTION FOR DIGHA PWSS PH-1. BILL/03138/2023-2024 BP-2023-24-648 20/03/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 6.12 0.00 0 0
5401 PURBA BARDHAMAN Ausgram - I Central Mechanical DIGHA PIPED WATER SUPPLY SCHEME , SM/13938 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at DIGHA Water Supply Scheme [ Block- AUSGRAM-1 ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. Driller In-Charge JUNIOR ENGINEER ORD/000808/2023-2024 4093/CMD 29/08/2023 30 A.S. ENTERPRISE 29.55 0.00 0 48
5402 PURBA BARDHAMAN Ausgram - I Central Mechanical DIGHA PIPED WATER SUPPLY SCHEME , SM/13938 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Pichkuri, karatia & others water supply scheme under Ausgram-1 Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman Driller In-Charge JUNIOR ENGINEER ORD/000398/2024-2025 2764/CMD 26/09/2024 90 JAL PRAVAHIKA PVT LTD 52.55 0.00 0 0
5403 PURBA BARDHAMAN Ausgram - I Durgapur W/S Division DIGHA PIPED WATER SUPPLY SCHEME , SM/13938 New Material Requisition To Resource Division RTOR000003/2024-2025 1724/O/DWSD 10/12/2024 Resource Division 4.05 0.00 0 0
5404 PURBA BARDHAMAN Ausgram - I Burdwan Division DIGHA PIPED WATER SUPPLY SCHEME , SM/13938 New Sinking of Tube-wells, LDS, Rising Main, FHTC, Construction of 300 cum capacity RCC OHR with 20.0 mtr. with Staging height including soil investigation, construction of switch rooms, boundary walls with gates, land development, internal drains and internal pathways at different TW sites for DIGHA Piped Water Supply Scheme under Ausgram-I Block, District:- Purba Bardhaman [NEW SCHEME] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer1, Durgapur Sub-Division, PHE Dte. ORD/000463/2023-2024 3454/BWD 08/08/2023 730 APORUPA CONSTRUCTION 423.95 0.00 0 75
5405 PURBA BARDHAMAN Ausgram - I Durgapur W/S Division DIGHA PIPED WATER SUPPLY SCHEME , SM/13938 New Formal Work Order for Balance works related sinking of tubewells at GANGARAMPUR village, LDS with Jack Pushing, Rising Main Construction Switchroom and FHTC of DIGHA PWSS of Ausgram-I Block, under Durgapur W/S Division, PHE Dte. Assistant Engineer-I,Assistant Engineer-II Contractual Junior Engineer_3 ORD/000179/2024-2025 1573/DWSD 21/11/2024 120 MANASH GHOSH 189.93 0.00 0 95
5406 PURBA BARDHAMAN Ausgram - I Durgapur W/S Division DIGHA PIPED WATER SUPPLY SCHEME , SM/13938 New Material Requisition To Resource Division RTOR000061/2024-2025 481/DWSD 17/03/2025 Resource Division 0.14 0.00 0 0
5407 PURBA BARDHAMAN Katwa - II Burdwan Division JAGADANANDAPUR PIPED WATER SUPPLY SCHEME , SM/14054 New Material Requisition To Resource Division RTOR000062/2022-2023 1246/BWD 17/03/2023 Resource Division 17.02 0.00 0 0
5408 PURBA BARDHAMAN Katwa - II Burdwan Division JAGADANANDAPUR PIPED WATER SUPPLY SCHEME , SM/14054 New Material Requisition To Resource Division RTOR000096/2022-2023 1638/BWD 06/04/2023 Resource Division 1.10 0.00 0 0
5409 PURBA BARDHAMAN Katwa - II Central Mechanical JAGADANANDAPUR PIPED WATER SUPPLY SCHEME , SM/14054 New New service connection charges for Jagadanandapur W/S Scheme TW-1 BILL/00694/2023-2024 BP-2023-24-36 27/06/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.38 0.00 0 0
5410 PURBA BARDHAMAN Katwa - II Central Mechanical JAGADANANDAPUR PIPED WATER SUPPLY SCHEME , SM/14054 New New service connection charges for Jagadanandapur PWSS TW-2 BILL/00797/2023-2024 BP-2023-24-85 26/07/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 5.95 0.00 0 0
5411 PURBA BARDHAMAN Katwa - II Burdwan Division JAGADANANDAPUR PIPED WATER SUPPLY SCHEME , SM/14054 New Material Requisition To Resource Division RTOR000786/2023-2024 327/BWD 24/01/2024 Resource Division 22.74 0.00 0 0
5412 PURBA BARDHAMAN Katwa - II Central Mechanical JAGADANANDAPUR PIPED WATER SUPPLY SCHEME , SM/14054 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Mulgram & others water supply scheme under Katwa-II Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. ASSISTANT ENGINEER Junior Engineer ORD/000070/2024-2025 2409/CMD 02/08/2024 90 DUTTA ENTERPRISE 50.18 0.00 0 0
5413 PURBA BARDHAMAN Katwa - II Central Mechanical JAGADANANDAPUR PIPED WATER SUPPLY SCHEME , SM/14054 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at Jagadanandapur Water Supply Scheme [ Block- KATWA-2 ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. Driller In-Charge Junior Engineer ORD/000126/2023-2024 2659/CMD 16/06/2023 30 PADMA ENGINEERING CO. 28.97 21.56 74.42 60
5414 PURBA BARDHAMAN Katwa - II Burdwan Division JAGADANANDAPUR PIPED WATER SUPPLY SCHEME , SM/14054 New Continuation Work Order for Supply of 1 (one) No. Inspection Vehicle for different JJM Related Works as and when required including supply of driver and fuels (Minimum 8 Hours of duty) under Katwa Sub-Division within Burdwan Division, P.H.E. Dte. Consider 96.00 Km run per Day Assistant Engineer JUNIOR ENGINEER KATWA SUB-DIVISION PHE DTE ORD/000683/2024-2025 1009/KTS 19/07/2024 60 AJIT SAMANTA 0.77 0.17 22.08 100
5415 PURBA BARDHAMAN Katwa - II Burdwan Division JAGADANANDAPUR PIPED WATER SUPPLY SCHEME , SM/14054 New JAGADANANDAPUR Piped Water Supply Scheme with sinking of Tube-well, LDS, Rising Main, FHTC, Construction of 400 cum capacity RCC OHR with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drain and internal pathway at different TW site under KATWA -II Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer JUNIOR ENGINEER KATWA SUB-DIVISION PHE DTE ORD/000711/2022-2023 777/BWD 24/02/2023 677 MANASH GHOSH 562.08 230.55 41.02 78
5416 PURBA BARDHAMAN Katwa - II Burdwan Division JAGADANANDAPUR PIPED WATER SUPPLY SCHEME , SM/14054 New Providing of left out FHTC in different location of JAGADANANDAPUR PWSS (SM/14054) at Musthuli Mouza in order to declare Sajal Gram, under Katwa-II Block under Katwa Sub-Division, PHE Dte. Assistant Engineer ORD/001314/2024-2025 980/BWD 13/03/2025 21 MANASH GHOSH 9.53 0.00 0 0
5417 PURBA BARDHAMAN Katwa - II Burdwan Division JAGADANANDAPUR PIPED WATER SUPPLY SCHEME , SM/14054 New Providing of left out FHTC in different location of JAGADANANDAPUR PWSS (SM/14054) at Jagadanandapur, and Amdanga Mouza in order to declare Sajal Gram, under Katwa-II Block under Katwa Sub-Division, PHE Dte. Assistant Engineer ORD/001315/2024-2025 981/BWD 13/03/2025 21 MANASH GHOSH 9.55 0.00 0 0
5418 PURBA BARDHAMAN Kalna - I Burdwan Division DEARA PIPED WATER SUPPLY SCHEME , SM/14435 New Material Requisition To Resource Division RTOR000087/2022-2023 1237/BWD 17/03/2023 Resource Division 10.42 0.00 0 0
5419 PURBA BARDHAMAN Kalna - I Burdwan Division DEARA PIPED WATER SUPPLY SCHEME , SM/14435 New Material Requisition To Resource Division RTOR000091/2022-2023 1640/BWD 06/04/2023 Resource Division 4.70 0.00 0 0
5420 PURBA BARDHAMAN Kalna - I Burdwan Division DEARA PIPED WATER SUPPLY SCHEME , SM/14435 New Material Requisition To Resource Division RTOR000515/2023-2024 3967/BWD 08/09/2023 Resource Division 19.84 0.00 0 0
5421 PURBA BARDHAMAN Kalna - I Burdwan Division DEARA PIPED WATER SUPPLY SCHEME , SM/14435 New Material Requisition To Resource Division RTOR000638/2023-2024 5093/BWD 23/11/2023 Resource Division 21.42 0.00 0 0
5422 PURBA BARDHAMAN Kalna - I Central Mechanical DEARA PIPED WATER SUPPLY SCHEME , SM/14435 New New service connection charges for Deara PWSS TW-1 BILL/01669/2023-2024 BP-2023-24-222 10/11/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 5.46 0.00 0 0
5423 PURBA BARDHAMAN Kalna - I Burdwan Division DEARA PIPED WATER SUPPLY SCHEME , SM/14435 New Work Order for "Supply of 1 (one) No. Diesel driven Motor cab (Inspection vehicle) on hire basis for JJM projects for the Office of the Assistant Engineer, under Kalna Sub-Division within Burdwan Division, P.H.E. Dte. [Period for 3 (Three) Months]". Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000668/2023-2024 1333/KSD 28/08/2023 72 PARTHA PRATIM ACHARYA 0.92 0.56 60.87 100
5424 PURBA BARDHAMAN Kalna - I Central Mechanical DEARA PIPED WATER SUPPLY SCHEME , SM/14435 New New service connection for DEARA PWSS BILL/02561/2023-2024 BP-2023-24-544 19/02/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 8.53 0.00 0 0
5425 PURBA BARDHAMAN Kalna - I Burdwan Division DEARA PIPED WATER SUPPLY SCHEME , SM/14435 New Work order for "CONSTRUCTION OF TEMPORARY KIOSK FOR THE NECESSARY ARRANGEMENT OF ELECTRIFICATION OF TUBEWELL FOR DEARA PWSS UNDER KALNA SUB-DIVISION UNDER BURDWAN DIVISION, PHE DTE." Assistant Engineer Junior Engineer, R.W.S. Burdwan Sub Division, P.H.E. Dt ORD/001143/2023-2024 1979/KSD 09/02/2024 10 ER CONSTRUCTION & GENERAL ORDER SUPPLIER 0.66 0.00 0 100
5426 PURBA BARDHAMAN Kalna - I Central Mechanical DEARA PIPED WATER SUPPLY SCHEME , SM/14435 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Joykrishnapur & others water supply scheme under Purbasthali-2,jamalpur,kalna 1 Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000101/2024-2025 2398/CMD 02/08/2024 90 MS S G ENTERPRISE 53.43 0.00 0 0
5427 PURBA BARDHAMAN Kalna - I Burdwan Division DEARA PIPED WATER SUPPLY SCHEME , SM/14435 New Different works related (sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of different capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site) to DEARA, PATHARDANGA & SHIKARPUR Piped Water Supply Scheme under KALNA-I Block, District:- Purba Bardhaman [NEW SCHEME] Assistant Engineer Junior Engineer, R.W.S. Burdwan Sub Division, P.H.E. Dt ORD/000734/2022-2023 1004/BWD 06/03/2023 365 M/S TAPAS KUMAR CHAKRABORTY 1,584.09 89.53 5.65 75
5428 PURBA BARDHAMAN Kalna - I Central Mechanical DEARA PIPED WATER SUPPLY SCHEME , SM/14435 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at Deara Water Supply Scheme [ Block- KALNA-1 ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000757/2023-2024 4060/CMD 29/08/2023 485 S.K. ENTERPRISE 28.60 0.00 0 100
5429 PURBA BARDHAMAN Kalna - I Central Mechanical DEARA PIPED WATER SUPPLY SCHEME , SM/14435 New Installation of Electrical items & allied works for Urgent FHTC for Deara PH 1 water supply scheme under CMD P.H.E. Dte. ASSISTANT ENGINEER Junior Engineer ORD/000500/2024-2025 822/CMSD 31/05/2024 30 S.K. ENTERPRISE 0.64 0.00 0 100
5430 PURBA BARDHAMAN Kalna - I Central Mechanical DEARA PIPED WATER SUPPLY SCHEME , SM/14435 New Continuation Order-Providing Diesel generator set at DEARA Water supply scheme for Urgent FHTC connection under CMD PHE Dte. [W.E.F- 05.06.2024 TO 08.06.2024] ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000461/2024-2025 827/CMSD 04/06/2024 7 S.K. ENTERPRISE 0.85 0.00 0 100
5431 PURBA BARDHAMAN Kalna - I Central Mechanical DEARA PIPED WATER SUPPLY SCHEME , SM/14435 New Providing Diesel generator set at Deara water supply scheme for Urgent FHTC connection under CMD P.H.E. Dte. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000437/2024-2025 821/CMSD 31/05/2024 7 S.K. ENTERPRISE 0.85 0.00 0 100
5432 PURBA BARDHAMAN Kalna - I Central Mechanical DEARA PIPED WATER SUPPLY SCHEME , SM/14435 New Installation of Electrical items & allied works for Urgent FHTC for Deara PH 2 water supply scheme under CMD P.H.E. Dte. ASSISTANT ENGINEER Junior Engineer ORD/000501/2024-2025 823/CMSD 31/05/2024 30 S.K. ENTERPRISE 0.64 0.00 0 100
5433 PURBA BARDHAMAN Kalna - I Central Mechanical DEARA PIPED WATER SUPPLY SCHEME , SM/14435 New Continuation Order-Providing Diesel generator set at DEARA Water Supply Scheme for Urgent FHTC connection under CMD PHE Dte [09/06/2024 to 12/06/2024] ASSISTANT ENGINEER Junior Engineer ORD/000649/2024-2025 836/CMSD 07/06/2024 7 S.K. ENTERPRISE 0.85 0.00 0 100
5434 PURBA BARDHAMAN Kalna - I Burdwan Division DEARA PIPED WATER SUPPLY SCHEME , SM/14435 New Work order for "Restoration of pipeline with other allied works at different places of Deara mouja under Deara Pwss due to construction of rcc cover drain & widening of rcc concrete road constructed by PRI body under Kalna-I panchayat samiti under Kalna Sub-Division under Burdwan Division, PHE Dte." Assistant Engineer Junior Engineer, R.W.S. Burdwan Sub Division, P.H.E. Dt ORD/000525/2024-2025 968/KSD 31/07/2024 10 M/S TAPAS KUMAR CHAKRABORTY 2.35 0.00 0 100
5435 PURBA BARDHAMAN Kalna - I Burdwan Division DEARA PIPED WATER SUPPLY SCHEME , SM/14435 New Supply & Laying of 300mm Dia M.S.E.R.W Pipe including Jack Pushing along with other allied work in connection with different Augmentation & New [(SM/18439, SM/14437, SM/14435, SM/07805, SM/14440, SM/15571, SM/08030, SM/16014, SM/15588, SM/16298 & SM/16307)] under Kalna Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/001187/2024-2025 608/BWD 11/02/2025 180 MANASH GHOSH 1,209.62 0.00 0 0
5436 PURBA BARDHAMAN Manteswar Burdwan Division IBRAMBAD PIPED WATER SUPPLY SCHEME , SM/14444 New Material Requisition To Resource Division RTOR000278/2023-2024 2197/BWD 12/05/2023 Resource Division 3.02 0.00 0 0
5437 PURBA BARDHAMAN Manteswar Burdwan Division IBRAMBAD PIPED WATER SUPPLY SCHEME , SM/14444 New Material Requisition To Resource Division RTOR000454/2023-2024 3978/BWD 08/09/2023 Resource Division 32.08 0.00 0 0
5438 PURBA BARDHAMAN Manteswar Burdwan Division IBRAMBAD PIPED WATER SUPPLY SCHEME , SM/14444 New Material Requisition To Resource Division RTOR000520/2023-2024 4052/BWD 11/09/2023 Resource Division 3.03 0.00 0 0
5439 PURBA BARDHAMAN Manteswar Central Mechanical IBRAMBAD PIPED WATER SUPPLY SCHEME , SM/14444 New Quotation for new electric service connection at Ibrambad PH NO.-2 BILL/01749/2023-2024 BP-2023-24-249 07/12/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 6.13 0.00 0 0
5440 PURBA BARDHAMAN Manteswar Burdwan Division IBRAMBAD PIPED WATER SUPPLY SCHEME , SM/14444 New Material Requisition To Resource Division RTOR000780/2023-2024 323/BWD 24/01/2024 Resource Division 34.15 0.00 0 0
5441 PURBA BARDHAMAN Manteswar Central Mechanical IBRAMBAD PIPED WATER SUPPLY SCHEME , SM/14444 New NEW SERVICE CONNECTION FOR IBRAMBAD PWSS. BILL/02690/2023-2024 BP-2023-24-573 27/02/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 4.51 0.00 0 0
5442 PURBA BARDHAMAN Manteswar Central Mechanical IBRAMBAD PIPED WATER SUPPLY SCHEME , SM/14444 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at Ibrambad Water Supply Scheme [ Block- Monteswar ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000765/2023-2024 4064/CMD 29/08/2023 30 M/S. S.R. ENTERPRISE 28.96 0.00 0 90
5443 PURBA BARDHAMAN Manteswar Burdwan Division IBRAMBAD PIPED WATER SUPPLY SCHEME , SM/14444 New Different works related (sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of different capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site) to DHENUA, IBRAMBAD & UJNA Piped Water Supply Scheme under Manteswar Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer ,JUNIOR ENGINEER DURGAPUR SUB-DIVISION PHE DTE ORD/000462/2023-2024 3456/BWD 08/08/2023 365 M/S S. CHOUDHURY 2,123.70 0.00 0 20
5444 PURBA BARDHAMAN Manteswar Central Mechanical IBRAMBAD PIPED WATER SUPPLY SCHEME , SM/14444 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Sutra & others water supply scheme under Monteswar Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000068/2024-2025 2396/CMD 02/08/2024 455 SINHA ELECTRICALS 78.06 0.00 0 20
5445 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED WATER SUPPLY SCHEME FOR NASRATPUR PWSS (PART-B) UNDER BURDWAN DIVISION BLOCK PURBASTHALI I DISTRICT PURBA BARDDHAMAN , SM/14014 Augmentation Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of NASARATPUR Piped Water Supply Scheme at Gopinathpur (Part), Nasaratput (Part) & Paruldanga (Part) Village (Mouza), Purbasthali - I Block under Burdwan Division, PHE Dte Assistant Engineer ORD/000372/2021-2022 211/BWD 11/01/2022 60 KHEPIMA ENGINEERS CO. OPERATIVE SOCIETY LTD. 76.77 59.72 77.79 1
5446 PURBA BARDHAMAN Central Mechanical AUGMENTATION OF GROUND WATER BASED WATER SUPPLY SCHEME FOR NASRATPUR PWSS (PART-B) UNDER BURDWAN DIVISION BLOCK PURBASTHALI I DISTRICT PURBA BARDDHAMAN , SM/14014 Augmentation New service connection for Augmentation of Nasratpur PWSS TW-2. BILL/02397/2023-2024 BP-2023-24-509 06/02/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 8.21 0.00 0 0
5447 PURBA BARDHAMAN Central Mechanical AUGMENTATION OF GROUND WATER BASED WATER SUPPLY SCHEME FOR NASRATPUR PWSS (PART-B) UNDER BURDWAN DIVISION BLOCK PURBASTHALI I DISTRICT PURBA BARDDHAMAN , SM/14014 Augmentation New service connection for augmentation of Nasratpur PH-I PWSS. BILL/00085/2024-2025 BP-2024-25-30 19/04/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 10.19 0.00 0 0
5448 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED WATER SUPPLY SCHEME FOR NASRATPUR PWSS (PART-B) UNDER BURDWAN DIVISION BLOCK PURBASTHALI I DISTRICT PURBA BARDDHAMAN , SM/14014 Augmentation Work Order for "CONSTRUCTION OF TEMPORARY KIOSK FOR THE NECESSARY ARRANGEMENT OF ELECTRIFICATION OF TUBEWELL UNDER NASARATPUR PWSS UNDER KALNA SUB-DIVISION UNDER BURDWAN DIVISION, PHE DTE." Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/001142/2023-2024 1978/KSD 09/02/2024 10 BISWAS ENTERPRISE 0.66 0.00 0 100
5449 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED WATER SUPPLY SCHEME FOR NASRATPUR PWSS (PART-B) UNDER BURDWAN DIVISION BLOCK PURBASTHALI I DISTRICT PURBA BARDDHAMAN , SM/14014 Augmentation Digital structurization of pipeline alignment and asset evaluation including holistic design, preparation of design drawings of overall LDS & preparation of estimate for 14 Nos. Piped W/S. Schemes under Purbasthali I Block under Kalna Sub-Division under Burdwan Division, PHE. Dte. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000337/2024-2025 3017/BWD 05/08/2024 75 HORIZEN 38.00 0.00 0 100
5450 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED WATER SUPPLY SCHEME FOR NASRATPUR PWSS (PART-B) UNDER BURDWAN DIVISION BLOCK PURBASTHALI I DISTRICT PURBA BARDDHAMAN , SM/14014 Augmentation Different types of works involve in connection with Augmentation of NASRATPUR PWSS (SM/14014), Purbasthali-I Block, under Kalna Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer ORD/001098/2024-2025 432/BWD 20/01/2025 120 SANDIP BISWAS 199.50 0.00 0 0
5451 PURBA BARDHAMAN Central Mechanical AUGMENTATION OF GROUND WATER BASED WATER SUPPLY SCHEME FOR NASRATPUR PWSS (PART-B) UNDER BURDWAN DIVISION BLOCK PURBASTHALI I DISTRICT PURBA BARDDHAMAN , SM/14014 Augmentation Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.- 3 & 4 at Augumentation of NASRATPUR Water Supply Scheme [BLOCK- PURBASTHALI-1] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/001613/2023-2024 1544/CMD 05/03/2024 453 MS DAS ELECTRIC CO 24.63 0.00 0 95
5452 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED WATER SUPPLY SCHEME FOR NASRATPUR PWSS (PART-B) UNDER BURDWAN DIVISION BLOCK PURBASTHALI I DISTRICT PURBA BARDDHAMAN , SM/14014 Augmentation Augmentation of NASARATPUR (Part-B) Piped Water Supply Scheme with Sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of switch rooms & Boundary walls with gates at different TW site under Purbasthali-I Block, District:- Purba Bardhaman. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000502/2023-2024 3535/BWD 10/08/2023 541 IJABUL SEKH 512.69 39.56 7.72 60
5453 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED WATER SUPPLY SCHEME FOR NASRATPUR PWSS (PART-B) UNDER BURDWAN DIVISION BLOCK PURBASTHALI I DISTRICT PURBA BARDDHAMAN , SM/14014 Augmentation Construction of 1.5 mtrs. Height Boundary Wall along with 750 mm Height 3 layer barbed wire in connection with Augmentation of .NASARATPUR Piped water supply scheme within Kalna Sub-Division under Burdwan Division, PHE Dte.(P.H: 1) Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/001292/2024-2025 3732/BWD 29/10/2024 30 DEBJYOTI GOSWAMI 9.71 0.00 0 1
5454 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED WATER SUPPLY SCHEME FOR NASRATPUR PWSS (PART-B) UNDER BURDWAN DIVISION BLOCK PURBASTHALI I DISTRICT PURBA BARDDHAMAN , SM/14014 Augmentation Construction of 1.5 mtrs. Height Boundary Wall along with 750 mm Height 3 layer barbed wire in connection with Augmentation of NASARATPUR Piped water supply scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. (P.H: 2) Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/001291/2024-2025 3731/BWD 29/10/2024 30 CHOWDHURY CONSTRUCTION 9.68 0.00 0 100
5455 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED WATER SUPPLY SCHEME FOR NASRATPUR PWSS (PART-B) UNDER BURDWAN DIVISION BLOCK PURBASTHALI I DISTRICT PURBA BARDDHAMAN , SM/14014 Augmentation Wbsedcl Quotation for new service connection at Nasaratpur Pwss Ph-03 BILL/01382/2024-2025 null 27/02/2025 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.37 0.00 0 null
5456 PURBA BARDHAMAN Galsi - II Burdwan Division BELGRAM PIPED WATER SUPPLY SCHEME , SM/14018 New Material Requisition To Resource Division RTOR000028/2023-2024 1962/BWD 25/04/2023 Resource Division 141.29 0.00 0 0
5457 PURBA BARDHAMAN Galsi - II Burdwan Division BELGRAM PIPED WATER SUPPLY SCHEME , SM/14018 New Material Requisition To Resource Division RTOR000243/2023-2024 2197/BWD 12/05/2023 Resource Division 9.94 0.00 0 0
5458 PURBA BARDHAMAN Galsi - II Burdwan Division BELGRAM PIPED WATER SUPPLY SCHEME , SM/14018 New Material Requisition To Resource Division RTOR000577/2023-2024 4925/BWD 10/11/2023 Resource Division 39.08 0.00 0 0
5459 PURBA BARDHAMAN Galsi - II Central Mechanical BELGRAM PIPED WATER SUPPLY SCHEME , SM/14018 New New service connection charges for Belgram PWSS TW-1 BILL/02192/2023-2024 BP-2023-24-372 16/01/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 4.27 0.00 0 0
5460 PURBA BARDHAMAN Galsi - II Burdwan Division BELGRAM PIPED WATER SUPPLY SCHEME , SM/14018 New Quotation from WBSEDCL for load enhancement of Belgram water supply scheme for PH-2 under Burdwan Division, PHE Dte. BILL/00171/2024-2025 267/JJM 21/05/2024 WBSEDCL 4.33 0.00 0 0
5461 PURBA BARDHAMAN Galsi - II Central Mechanical BELGRAM PIPED WATER SUPPLY SCHEME , SM/14018 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Satinandi,Sanko & others water supply scheme under Galsi-1 Block ; Serpur, Uchalan & others water supply scheme under Raina-2 Block and maro, loapur & others water supply scheme under Galsi-2 block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000397/2024-2025 2751/CMD 24/09/2024 90 ORIENTAL ENGINEERING CO. 88.42 0.00 0 0
5462 PURBA BARDHAMAN Galsi - II Central Mechanical BELGRAM PIPED WATER SUPPLY SCHEME , SM/14018 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at Belgrem Water Supply Scheme [ Block- Galsi-2 ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. Driller In-Charge JUNIOR ENGINEER ORD/000768/2023-2024 4066/CMD 29/08/2023 580 PADMA ENGINEERING CO. 27.78 11.30 40.68 48
5463 PURBA BARDHAMAN Galsi - II Burdwan Division BELGRAM PIPED WATER SUPPLY SCHEME , SM/14018 New Different works related (sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of different capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site) to SHYAMSUNDARPUR & BELGRAM Piped Water Supply Scheme under Galsi-II Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer ,JUNIOR ENGINEER DURGAPUR SUB-DIVISION PHE DTE ORD/000086/2023-2024 2147/BWD 10/05/2023 730 MAHMOOD ASSOCIATES PVT. LTD. 1,172.24 57.50 4.91 78
5464 PURBA BARDHAMAN Galsi - I Burdwan Division KRISHNARAMPUR PIPED WATER SUPPLY SCHEME , SM/14072 New Material Requisition To Resource Division RTOR000025/2023-2024 1962/BWD 25/04/2023 Resource Division 79.10 0.00 0 0
5465 PURBA BARDHAMAN Galsi - I Burdwan Division KRISHNARAMPUR PIPED WATER SUPPLY SCHEME , SM/14072 New Material Requisition To Resource Division RTOR000388/2023-2024 2197/BWD 12/05/2023 Resource Division 17.75 0.00 0 0
5466 PURBA BARDHAMAN Galsi - I Central Mechanical KRISHNARAMPUR PIPED WATER SUPPLY SCHEME , SM/14072 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1, 2 & 3 at KRISHNARAMPUR Water Supply Scheme [ Block- GALSI-2] under CMD, PHE Dte., Dist.- Purba-Bardhaman. Driller In-Charge JUNIOR ENGINEER ORD/000797/2023-2024 4085/CMD 29/08/2023 30 BENGAL CONSTRUCTION. 40.47 0.00 0 0
5467 PURBA BARDHAMAN Galsi - I Burdwan Division KRISHNARAMPUR PIPED WATER SUPPLY SCHEME , SM/14072 New Material Requisition To Resource Division RTOR000737/2023-2024 5236/BWD 30/11/2023 Resource Division 18.78 0.00 0 0
5468 PURBA BARDHAMAN Galsi - I Burdwan Division KRISHNARAMPUR PIPED WATER SUPPLY SCHEME , SM/14072 New Material Requisition To Resource Division RTOR000791/2023-2024 317/BWD 24/01/2024 Resource Division 43.39 0.00 0 0
5469 PURBA BARDHAMAN Galsi - I Central Mechanical KRISHNARAMPUR PIPED WATER SUPPLY SCHEME , SM/14072 New NEW SERVICE CONNECTION FOR KRISHNARAMPUR PWSS PH-2. BILL/02869/2023-2024 BP-2023-24-607 06/03/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 5.94 0.00 0 0
5470 PURBA BARDHAMAN Galsi - I Central Mechanical KRISHNARAMPUR PIPED WATER SUPPLY SCHEME , SM/14072 New NEW SERVICE CONNECTION FOR KRISHNARAMPUR PWSS PH-1. BILL/02868/2023-2024 BP-2023-24-606 06/03/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 6.75 0.00 0 0
5471 PURBA BARDHAMAN Galsi - I Durgapur W/S Division KRISHNARAMPUR PIPED WATER SUPPLY SCHEME , SM/14072 New Sinking of 300 X 200mm dia Tube Well 150 mtr. Depth by D.R. Rig method for Trial Bore at Uchchagram under Krishnarampur PWSS (JJM) District:- Purba-Bardhaman, Under Durgapur W/S Division , PHE Dte. Assistant Engineer-II JUNIOR ENGINEER-2 ORD/000153/2024-2025 1418/DWSD 03/10/2024 20 D.M.ENTERPRISE 6.61 0.00 0 80
5472 PURBA BARDHAMAN Galsi - I Central Mechanical KRISHNARAMPUR PIPED WATER SUPPLY SCHEME , SM/14072 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Satinandi,Sanko & others water supply scheme under Galsi-1 Block ; Serpur, Uchalan & others water supply scheme under Raina-2 Block and maro, loapur & others water supply scheme under Galsi-2 block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000397/2024-2025 2751/CMD 24/09/2024 90 ORIENTAL ENGINEERING CO. 88.42 0.00 0 0
5473 PURBA BARDHAMAN Galsi - I Durgapur W/S Division KRISHNARAMPUR PIPED WATER SUPPLY SCHEME , SM/14072 New Acceptance cum Formal Work Order for Balance work for KRISHNARAMPUR Piped Water Supply Scheme i.e , Contruction of boundary walls with gates and land development, drain and internal pathway etc. at 3rd Pump house site & FHTC work under GALSI-I Block, District:- Purba-Bardhaman under Durgapur W/S Division, PHE Dte. Assistant Engineer-II JUNIOR ENGINEER-1 ORD/000167/2024-2025 1549/DWSD 14/11/2024 90 JOY GURU ENTERPRISE 43.27 0.00 0 0
5474 PURBA BARDHAMAN Galsi - I Durgapur W/S Division KRISHNARAMPUR PIPED WATER SUPPLY SCHEME , SM/14072 New Material Requisition To Resource Division RTOR000006/2024-2025 1724/Q/DWSD 10/12/2024 Resource Division 4.00 0.00 0 0
5475 PURBA BARDHAMAN Galsi - I Durgapur W/S Division KRISHNARAMPUR PIPED WATER SUPPLY SCHEME , SM/14072 New Acceptance cum Formal Work Order for Sinking of 300 x 200 mm dia tube well 150 mtr depth by DR Rig method for trial bore at Sirorai and Bikrampur under Krishnarampur PWSS (JJM), Dist- Purba Bardhaman under Durgapur W/S Division, PHE Dte. Assistant Engineer-II JUNIOR ENGINEER-2 ORD/000186/2024-2025 1597/DWSD 25/11/2024 20 MANASH GHOSH 10.17 0.00 0 100
5476 PURBA BARDHAMAN Galsi - I Burdwan Division KRISHNARAMPUR PIPED WATER SUPPLY SCHEME , SM/14072 New KRISHNARAMPUR Piped Water Supply Scheme with sinking of Tube-well, LDS, Rising Main, FHTC, Construction of 300 cum capacity RCC OHR with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drain and internal pathway at different TW site under Galsi-I Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer1, Durgapur Sub-Division, PHE Dte. ORD/000403/2023-2024 3234/BWD 26/07/2023 791 DUTTA ENTERPRISE 661.41 0.00 0 80
5477 PURBA BARDHAMAN Ausgram - II Burdwan Division PHANRIJANGALPIPED WATER SUPPLY SCHEME , SM/14060 New Material Requisition To Resource Division RTOR000002/2023-2024 1962/BWD 25/04/2023 Resource Division 32.65 0.00 0 0
5478 PURBA BARDHAMAN Ausgram - II Burdwan Division PHANRIJANGALPIPED WATER SUPPLY SCHEME , SM/14060 New Material Requisition To Resource Division RTOR000369/2023-2024 2197/BWD 12/05/2023 Resource Division 13.24 0.00 0 0
5479 PURBA BARDHAMAN Ausgram - II Central Mechanical PHANRIJANGALPIPED WATER SUPPLY SCHEME , SM/14060 New New service connection charges for Phanrijangal PWSS TW 1 BILL/01484/2023-2024 BP-2023-24-184 04/10/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.21 0.00 0 0
5480 PURBA BARDHAMAN Ausgram - II Burdwan Division PHANRIJANGALPIPED WATER SUPPLY SCHEME , SM/14060 New Material Requisition To Resource Division RTOR000634/2023-2024 5090/BWD 23/11/2023 Resource Division 21.84 0.00 0 0
5481 PURBA BARDHAMAN Ausgram - II Central Mechanical PHANRIJANGALPIPED WATER SUPPLY SCHEME , SM/14060 New New service connection charges for Phanrijangal PWSS TW-2 BILL/01544/2023-2024 BP-2023-24-213 03/11/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 5.42 0.00 0 0
5482 PURBA BARDHAMAN Ausgram - II Central Mechanical PHANRIJANGALPIPED WATER SUPPLY SCHEME , SM/14060 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at PHANRIJANGAL Water Supply Scheme [ Block- AUSGRAM-2] under CMD, PHE Dte., Dist.- Purba-Bardhaman. Driller In-Charge JUNIOR ENGINEER ORD/000692/2023-2024 4017/CMD 29/08/2023 30 SOUNAK ENTERPRISE 28.48 0.00 0 98
5483 PURBA BARDHAMAN Ausgram - II Burdwan Division PHANRIJANGALPIPED WATER SUPPLY SCHEME , SM/14060 New PHANRIJANGAL Piped Water Supply Scheme with sinking of Tube-well, LDS, Rising Main, FHTC, & construction of switch rooms & boundary walls with gates and land development, drain and internal pathway at different TW site under Ausgram-II Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer ORD/000173/2023-2024 3030/BWD 14/07/2023 180 SUPRIYA RAY 271.24 29.89 11.02 35
5484 PURBA BARDHAMAN Ausgram - II Central Mechanical PHANRIJANGALPIPED WATER SUPPLY SCHEME , SM/14060 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Chora, Kalaijhuti & others water supply scheme under Ausgram-2 Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. Driller In-Charge JUNIOR ENGINEER ORD/000143/2024-2025 2405/CMD 02/08/2024 90 NABAUDYOG ELECTRICAL ENGINEERING CO-OPERATIVE SOCIETY LTD 95.26 0.00 0 0
5485 PURBA BARDHAMAN Ausgram - II Durgapur W/S Division PHANRIJANGALPIPED WATER SUPPLY SCHEME , SM/14060 New FORMAL WORK ORDER FOR Balance work for PHANRIJANGAL PWSS with sining of Tube-well, LDS, Rising Main, FHTC & construction of switch rooms & boundary walls with gates and land development, drain and internal pathway at different TW site under Ausgram-II Block under DURGAPUR W/S DIVISION, PHE DTE. Assistant Engineer-II JUNIOR ENGINEER-1 ORD/000267/2024-2025 281/DWSD 17/02/2025 120 SUJAY KUMAR RAY 101.85 0.00 0 0
5486 PURBA BARDHAMAN Memari - II Burdwan Division NANDIARA PIPED WATER SUPPLY SCHEME , SM/14019 New Material Requisition To Resource Division RTOR000351/2023-2024 2197/BWD 12/05/2023 Resource Division 13.72 0.00 0 0
5487 PURBA BARDHAMAN Memari - II Burdwan Division NANDIARA PIPED WATER SUPPLY SCHEME , SM/14019 New Material Requisition To Resource Division RTOR000428/2023-2024 3836/BWD 01/09/2023 Resource Division 2.35 0.00 0 0
5488 PURBA BARDHAMAN Memari - II Burdwan Division NANDIARA PIPED WATER SUPPLY SCHEME , SM/14019 New Material Requisition To Resource Division RTOR000680/2023-2024 5064/BWD 23/11/2023 Resource Division 20.46 0.00 0 0
5489 PURBA BARDHAMAN Memari - II Central Mechanical NANDIARA PIPED WATER SUPPLY SCHEME , SM/14019 New New service connection for NANDIARA PWSS TW 2. BILL/02443/2023-2024 BP-2023-24-520 09/02/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 4.33 0.00 0 0
5490 PURBA BARDHAMAN Memari - II Central Mechanical NANDIARA PIPED WATER SUPPLY SCHEME , SM/14019 New New service connection for NANDIARA PWSS TW 1. BILL/02442/2023-2024 BP-2023-24-521 09/02/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 6.76 0.00 0 0
5491 PURBA BARDHAMAN Memari - II Burdwan Division NANDIARA PIPED WATER SUPPLY SCHEME , SM/14019 New Supply of inspection Vehicle for inspection of different JJM related(schemes)works as and when required including supply of driver & fuel(minimum 8 hours duty per day) and all taxes etc. for Burdwan Sub-Division under Burdwan Division,PHE Dte consider 96.00 Km. run per day (Period from 01-02-2024 to 30-04-2024) Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/001181/2023-2024 188/BSD 31/01/2024 66 PARVIN BEGAM 0.85 0.00 0 97
5492 PURBA BARDHAMAN Memari - II Burdwan Division NANDIARA PIPED WATER SUPPLY SCHEME , SM/14019 New NANDIARA Piped Water Supply Scheme with sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of 200 cum capacity RCC OHRs with 20.0 mtr. Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site under Memari-II Block, District:- Purba Bardhaman [NEW SCHEME] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER RWS BURDWAN SUB-DIVISION PHE DTE ORD/000487/2023-2024 3502/BWD 10/08/2023 365 S.S.S. ENTERPRISES 451.06 0.00 0 45
5493 PURBA BARDHAMAN Memari - II Central Mechanical NANDIARA PIPED WATER SUPPLY SCHEME , SM/14019 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at NOAHATI & others water supply scheme under Memari-II Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. ASSISTANT ENGINEER Junior Engineer ORD/000102/2024-2025 2395/CMD 02/08/2024 90 S.G. TECHNICAL SERVICES 36.99 0.00 0 0
5494 PURBA BARDHAMAN Memari - II Central Mechanical NANDIARA PIPED WATER SUPPLY SCHEME , SM/14019 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at Nandiara Water Supply Scheme [ Block- Memari-2 ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER Junior Engineer ORD/000715/2023-2024 4026/CMD 29/08/2023 642 JAGANNATH ENTERPRISE 29.39 0.00 0 50
5495 PURBA BARDHAMAN Memari - II Burdwan Division NANDIARA PIPED WATER SUPPLY SCHEME , SM/14019 New Continuation work order for "Supply of one No. Diesel Driven Ambassador Car on hire basis for the office of the Assistant Engineer, Burdwan Sub-Division, PHE Dte. (Period from 01-12-2024 to 28-02-2025 JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/001043/2024-2025 2636/BSD 29/11/2024 90 SK. ASFIA 1.20 0.78 65 60
5496 PURBA BARDHAMAN Purbasthali - I Burdwan Division MOUDANGA PIPED WATER SUPPLY SCHEME , SM/14020 New Material Requisition To Resource Division RTOR000346/2023-2024 2197/BWD 12/05/2023 Resource Division 14.15 0.00 0 0
5497 PURBA BARDHAMAN Purbasthali - I Burdwan Division MOUDANGA PIPED WATER SUPPLY SCHEME , SM/14020 New Material Requisition To Resource Division RTOR000511/2023-2024 4035/BWD 08/09/2023 Resource Division 1.38 0.00 0 0
5498 PURBA BARDHAMAN Purbasthali - I Burdwan Division MOUDANGA PIPED WATER SUPPLY SCHEME , SM/14020 New Material Requisition To Resource Division RTOR000804/2023-2024 305/BWD 24/01/2024 Resource Division 17.52 0.00 0 0
5499 PURBA BARDHAMAN Purbasthali - I Central Mechanical MOUDANGA PIPED WATER SUPPLY SCHEME , SM/14020 New New service connection for MOUDANGA PWSS BILL/02562/2023-2024 BP-2023-24-546 19/02/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 8.78 0.00 0 0
5500 PURBA BARDHAMAN Purbasthali - I Central Mechanical MOUDANGA PIPED WATER SUPPLY SCHEME , SM/14020 New New service connection for Moudanga PH-1 PWSS. BILL/00089/2024-2025 BP-2024-25-28 19/04/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 7.45 0.00 0 0
5501 PURBA BARDHAMAN Purbasthali - I Burdwan Division MOUDANGA PIPED WATER SUPPLY SCHEME , SM/14020 New Different types of works involve in connection with Augmentation of DIRGHAPARA (SM/07804) Water Supply Scheme, MOUDANGA (SM/ 14020) Water supply Scheme & BHANDARTIKURI (SM/14925) Water Supply Scheme under Burdwan Division, PHE Dte. Assistant Engineer ORD/000357/2024-2025 2912/BWD 25/07/2024 120 BANSBERIA CONSTRUCTION CO. 293.38 0.00 0 0
5502 PURBA BARDHAMAN Purbasthali - I Central Mechanical MOUDANGA PIPED WATER SUPPLY SCHEME , SM/14020 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Haripur & others water supply scheme under purbasthali 1 Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000072/2024-2025 2397/CMD 02/08/2024 90 CHATTERJEE ENTERPRISE 48.60 0.00 0 0
5503 PURBA BARDHAMAN Purbasthali - I Burdwan Division MOUDANGA PIPED WATER SUPPLY SCHEME , SM/14020 New Different works related (sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of different capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site) to NAMA BHANDARITURI, SAHAPUR & MOUDANGA Piped Water Supply Scheme under PURBASTHALI-I Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000511/2023-2024 3689/BWD 23/08/2023 770 THE MAHADEV CONSTRUCTION 734.18 0.00 0 50
5504 PURBA BARDHAMAN Purbasthali - I Central Mechanical MOUDANGA PIPED WATER SUPPLY SCHEME , SM/14020 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at MOUDANGA Water Supply Scheme [ Block- PURBASTHALI-1] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000829/2023-2024 4106/CMD 29/08/2023 581 WEST BENGAL ENGINEERING CO. 26.95 0.00 0 50
5505 PURBA BARDHAMAN Purbasthali - I Burdwan Division MOUDANGA PIPED WATER SUPPLY SCHEME , SM/14020 New Construction of 350cum OHR & Other Allied Works in connection with Augmentation of (SM/07803), (SM/09410), (SM/16304), (SM/15172) & (SM/14020) Piped Water Supply Scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/001048/2024-2025 220/BWD 10/01/2025 270 R.K. MANDAL& CO. 491.79 0.00 0 1
5506 PURBA BARDHAMAN Khandaghosh Burdwan Division TELUN PIPED WATER SUPPLY SCHEME , SM/13455 New Material Requisition To Resource Division RTOR000061/2023-2024 1962/BWD 25/04/2023 Resource Division 7.19 0.00 0 0
5507 PURBA BARDHAMAN Khandaghosh Burdwan Division TELUN PIPED WATER SUPPLY SCHEME , SM/13455 New Material Requisition To Resource Division RTOR000168/2023-2024 2155/BWD 10/05/2023 Resource Division 13.11 0.00 0 0
5508 PURBA BARDHAMAN Khandaghosh Central Mechanical TELUN PIPED WATER SUPPLY SCHEME , SM/13455 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at Telun Water Supply Scheme [ Block- Khandogosh ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER Junior Engineer ORD/000907/2023-2024 4171/CMD 29/08/2023 30 P.K. ENGINEERING 29.82 0.00 0 0
5509 PURBA BARDHAMAN Khandaghosh Burdwan Division TELUN PIPED WATER SUPPLY SCHEME , SM/13455 New Material Requisition To Resource Division RTOR000735/2023-2024 5258/BWD 30/11/2023 Resource Division 21.07 0.00 0 0
5510 PURBA BARDHAMAN Khandaghosh Central Mechanical TELUN PIPED WATER SUPPLY SCHEME , SM/13455 New Quotation for new service connection at TELUN W/S Scheme PH-II. BILL/01811/2023-2024 BP-2023-24-302 30/12/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 7.25 0.00 0 0
5511 PURBA BARDHAMAN Khandaghosh Central Mechanical TELUN PIPED WATER SUPPLY SCHEME , SM/13455 New New service connection charges for Telun PWSS TW-1 BILL/02208/2023-2024 BP-2023-24-392 17/01/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 4.90 0.00 0 0
5512 PURBA BARDHAMAN Khandaghosh Central Mechanical TELUN PIPED WATER SUPPLY SCHEME , SM/13455 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at BICHKHARA & others water supply scheme under Khandoghosh Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman ASSISTANT ENGINEER Junior Engineer ORD/000064/2024-2025 2390/CMD 02/08/2024 90 MS DAS ELECTRIC CO 46.54 0.00 0 0
5513 PURBA BARDHAMAN Khandaghosh Burdwan Division TELUN PIPED WATER SUPPLY SCHEME , SM/13455 New Balance work for providing Functional Household Tap Connection (FHTC) within the command area BICHKHARA & TELUN W/S. Scheme of Khandaghosh Block under Burdwan Division, PHE. Dte. Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer1, Durgapur Sub-Division, PHE Dte. ORD/001096/2024-2025 434/BWD 20/01/2025 120 KOUSIK MALLICK 108.55 0.00 0 0
5514 PURBA BARDHAMAN Khandaghosh Burdwan Division TELUN PIPED WATER SUPPLY SCHEME , SM/13455 New TELUN Piped Water Supply Scheme with sinking of Tube-well, LDS, Rising Main, FHTC, Construction of 300 cum capacity RCC OHR with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drain and internal pathway at different TW site under KHANDAGHOSH Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer1, Durgapur Sub-Division, PHE Dte.,Junior Engineer2, Durgapur Sub-Division, PHE Dte. ORD/000803/2022-2023 1535/BWD 29/03/2023 732 G.B. CONSTRUCTION & CO. 449.21 0.00 0 30
5515 PURBA BARDHAMAN Raina - I Burdwan Division GOPALPUR PIPED WATER SUPPLY SCHEME , SM/15235 New Material Requisition To Resource Division RTOR000197/2023-2024 2155/BWD 10/05/2023 Resource Division 12.69 0.00 0 0
5516 PURBA BARDHAMAN Raina - I Burdwan Division GOPALPUR PIPED WATER SUPPLY SCHEME , SM/15235 New Material Requisition To Resource Division RTOR000482/2023-2024 4006/BWD 08/09/2023 Resource Division 5.14 0.00 0 0
5517 PURBA BARDHAMAN Raina - I Central Mechanical GOPALPUR PIPED WATER SUPPLY SCHEME , SM/15235 New New service connection charges for Gopalpur PWSS TW-2 BILL/01528/2023-2024 BP-2023-24-193 11/10/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.82 0.00 0 0
5518 PURBA BARDHAMAN Raina - I Burdwan Division GOPALPUR PIPED WATER SUPPLY SCHEME , SM/15235 New Material Requisition To Resource Division RTOR000669/2023-2024 5083/BWD 23/11/2023 Resource Division 20.46 0.00 0 0
5519 PURBA BARDHAMAN Raina - I Burdwan Division GOPALPUR PIPED WATER SUPPLY SCHEME , SM/15235 New Restoration of hard shoulder from 0.00 km to 2.918 km of Sagrai Raina Road (MDR) for laying of water supply pipeline of Gopalpur PWSS under Burdwan Division, PHE Dte. BILL/01127/2023-2024 1084/JJM 20/12/2023 EXECUTIVE ENGINEER BURDWAN SOUTH HIGHWAY DIVISION P.W. (ROADS) DTE. 4.72 0.00 0 0
5520 PURBA BARDHAMAN Raina - I Central Mechanical GOPALPUR PIPED WATER SUPPLY SCHEME , SM/15235 New New electric connection for Gopalpur PWSS. BILL/01869/2023-2024 BP-2023-24-344 11/01/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.66 0.00 0 0
5521 PURBA BARDHAMAN Raina - I Central Mechanical GOPALPUR PIPED WATER SUPPLY SCHEME , SM/15235 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Bajitpur, Belsar & other water supply scheme under Raina-1 Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000117/2024-2025 2589/CMD 27/08/2024 90 DEY ENTERPRISE 74.58 0.00 0 0
5522 PURBA BARDHAMAN Raina - I Central Mechanical GOPALPUR PIPED WATER SUPPLY SCHEME , SM/15235 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at Gopalpur Water Supply Scheme [ Block- Raina-1 ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000720/2023-2024 4031/CMD 29/08/2023 30 M/S. SWAPAN BANERJEE 28.98 0.00 0 100
5523 PURBA BARDHAMAN Raina - I Burdwan Division GOPALPUR PIPED WATER SUPPLY SCHEME , SM/15235 New Field level data validation of FHTC executed by Agencies on the basis of pictorial data with the objective of controlling multiple entry,improving data quality in terms of absolute household by verification through electric connection or any other unique documents and making error free database of GOPALPUR Pipe Water Supply Scheme in Raina-I Block within Burdwan Sub-Division under Burdwan Division,PHE Dte JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000946/2024-2025 2732/BSD 10/12/2024 30 TECHVISION 0.56 0.00 0 0
5524 PURBA BARDHAMAN Raina - I Burdwan Division GOPALPUR PIPED WATER SUPPLY SCHEME , SM/15235 New Different works related (sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of different capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site) to GOPALPUR & RASUIKHANDA Piped Water Supply Scheme under Raina-I Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000006/2023-2024 1691/BWD 12/04/2023 629 SK ALIM 1,081.52 108.00 9.99 92
5525 PURBA BARDHAMAN Raina - I Burdwan Division GOPALPUR PIPED WATER SUPPLY SCHEME , SM/15235 New Balance work [i.e. Extension or parallel Pipeline, Leftout FHTC, Road Restoration work, Sinking of Additional Tube Well with Pump House & Boundary wall, inter Connection of Additional Tube Well, Construction of M.S.Structural bridge, canal Crossing, MS casing with allied work of Bhagabatipur, Machkhara, Udgara, Bantir, Chakpurohit Rasuikhanda, Sankarpur, Gopalpur & Belshar PWSS Block-RAINA- I under Burdwan Sub Division, PHE Dte. within Burdwan Division PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/001103/2024-2025 469/BWD 24/01/2025 180 SK ALIM 1,353.91 0.00 0 0
5526 PURBA BARDHAMAN Ketugram - II Burdwan Division BILLESWAR PIPED WATER SUPPLY SCHEME , SM/15241 New Material Requisition To Resource Division RTOR000062/2023-2024 1962/BWD 25/04/2023 Resource Division 0.83 0.00 0 0
5527 PURBA BARDHAMAN Ketugram - II Burdwan Division BILLESWAR PIPED WATER SUPPLY SCHEME , SM/15241 New Material Requisition To Resource Division RTOR000153/2023-2024 2155/BWD 10/05/2023 Resource Division 11.05 0.00 0 0
5528 PURBA BARDHAMAN Ketugram - II Burdwan Division BILLESWAR PIPED WATER SUPPLY SCHEME , SM/15241 New Material Requisition To Resource Division RTOR000624/2023-2024 4870/BWD 10/11/2023 Resource Division 29.60 0.00 0 0
5529 PURBA BARDHAMAN Ketugram - II Central Mechanical BILLESWAR PIPED WATER SUPPLY SCHEME , SM/15241 New New Service connection for Billwswar PWSS TW-2 BILL/02350/2023-2024 BP-2023-24-466 31/01/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.04 0.00 0 0
5530 PURBA BARDHAMAN Ketugram - II Central Mechanical BILLESWAR PIPED WATER SUPPLY SCHEME , SM/15241 New New service connection at Billeswar PWSS TW No.1 BILL/02374/2023-2024 BP-2023-24-493 01/02/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.28 0.00 0 0
5531 PURBA BARDHAMAN Ketugram - II Central Mechanical BILLESWAR PIPED WATER SUPPLY SCHEME , SM/15241 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at BILLESWAR Water Supply Scheme [ Block- KETUGRAM-2] under CMD, PHE Dte., Dist.- Purba-Bardhaman. Driller In-Charge Junior Engineer ORD/000779/2023-2024 4073/CMD 29/08/2023 30 KAMAKHYA ENTERPRISE 26.97 0.00 0 88
5532 PURBA BARDHAMAN Ketugram - II Central Mechanical BILLESWAR PIPED WATER SUPPLY SCHEME , SM/15241 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Kankurhati & others water supply scheme under Ketugram-2 Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. Driller In-Charge Junior Engineer ORD/000103/2024-2025 2408/CMD 02/08/2024 90 DIPALI CONSTRUCTION 41.95 0.00 0 0
5533 PURBA BARDHAMAN Ketugram - II Burdwan Division BILLESWAR PIPED WATER SUPPLY SCHEME , SM/15241 New Different works related (sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of different capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site) to BILLESWAR, GURPARA & PURULIA Piped Water Supply Scheme under KETUGRAM-II Block, District:- Purba Bardhaman [NEW SCHEME] Assistant Engineer JUNIOR ENGINEER KATWA SUB-DIVISION PHE DTE,JUNIOR ENGINEER R.W.S. BURDWAN SUB-DIVISION PHE DTE ORD/000038/2023-2024 1821/BWD 18/04/2023 897 PASCON 1,118.33 0.00 0 46
5534 PURBA BARDHAMAN Ketugram - II Burdwan Division BILLESWAR PIPED WATER SUPPLY SCHEME , SM/15241 New Balance work of OHR, construction Concrete Road, Drum Sheet Pilling, Functional Household Tap Connection, construction of HUME Pipe culvert, land development, Road restoration etc. under Billeswar PWSS, Purulia PWSS & Gurpara PWSS under KATWA -II Block under Katwa Sub-Divn. under Burdwan Division, PHED. District:- Purba-Bardhaman Assistant Engineer JUNIOR ENGINEER KATWA SUB-DIVISION PHE DTE ORD/000310/2024-2025 2834/BWD 19/07/2024 467 PASCON 190.06 0.00 0 90
5535 PURBA BARDHAMAN Ausgram - I Burdwan Division AUSGRAM PIPED WATER SUPPLY SCHEME , SM/14905 New Material Requisition To Resource Division RTOR000019/2023-2024 1962/BWD 25/04/2023 Resource Division 29.49 0.00 0 0
5536 PURBA BARDHAMAN Ausgram - I Burdwan Division AUSGRAM PIPED WATER SUPPLY SCHEME , SM/14905 New Material Requisition To Resource Division RTOR000214/2023-2024 2155/BWD 10/05/2023 Resource Division 15.16 0.00 0 0
5537 PURBA BARDHAMAN Ausgram - I Burdwan Division AUSGRAM PIPED WATER SUPPLY SCHEME , SM/14905 New Material Requisition To Resource Division RTOR000494/2023-2024 4018/BWD 08/09/2023 Resource Division 29.12 0.00 0 0
5538 PURBA BARDHAMAN Ausgram - I Burdwan Division AUSGRAM PIPED WATER SUPPLY SCHEME , SM/14905 New Material Requisition To Resource Division RTOR000595/2023-2024 4903/BWD 10/11/2023 Resource Division 33.07 0.00 0 0
5539 PURBA BARDHAMAN Ausgram - I Central Mechanical AUSGRAM PIPED WATER SUPPLY SCHEME , SM/14905 New Quotation for new service connection at Aushgram W/S Scheme for PH No-2 BILL/01818/2023-2024 BP-2023-24-329 03/01/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.96 0.00 0 0
5540 PURBA BARDHAMAN Ausgram - I Central Mechanical AUSGRAM PIPED WATER SUPPLY SCHEME , SM/14905 New Quotation for new service connection for Ausgram PWSS PH 1. BILL/00224/2024-2025 BP-2024-25-115 28/05/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 12.27 0.00 0 0
5541 PURBA BARDHAMAN Ausgram - I Burdwan Division AUSGRAM PIPED WATER SUPPLY SCHEME , SM/14905 New Different works related (sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of different capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site) to AUSGRAM & BHOTA Piped Water Supply Scheme under Ausgram-I Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer1, Durgapur Sub-Division, PHE Dte. ORD/000430/2023-2024 3324/BWD 02/08/2023 365 DUTTA ENTERPRISE 763.14 0.00 0 50
5542 PURBA BARDHAMAN Ausgram - I Central Mechanical AUSGRAM PIPED WATER SUPPLY SCHEME , SM/14905 New Quotation for new service connection at Ausgram PWSS PH-2 BILL/00383/2024-2025 BP-2024-25-204 18/07/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 1.87 0.00 0 0
5543 PURBA BARDHAMAN Ausgram - I Central Mechanical AUSGRAM PIPED WATER SUPPLY SCHEME , SM/14905 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Pichkuri, karatia & others water supply scheme under Ausgram-1 Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman Driller In-Charge JUNIOR ENGINEER ORD/000398/2024-2025 2764/CMD 26/09/2024 90 JAL PRAVAHIKA PVT LTD 52.55 0.00 0 0
5544 PURBA BARDHAMAN Ausgram - I Durgapur W/S Division AUSGRAM PIPED WATER SUPPLY SCHEME , SM/14905 New Acceptance cum Formal Work Order for LDS,FHTC,Road Restoration,Develop Boundary Wall Hight & Land Developement making With necessary allied works at AUSGRAM-I Block of BHOTA PWSS under Durgapur Water Supply Division, PHE Dte. Assistant Engineer-II Contractual Junior Engineer_1 ORD/000180/2024-2025 1617/DWSD 26/11/2024 90 TULIP ENGINEERS CO OP. SOCIETY LTD. 55.22 0.00 0 0
5545 PURBA BARDHAMAN Ausgram - I Durgapur W/S Division AUSGRAM PIPED WATER SUPPLY SCHEME , SM/14905 New Material Requisition To Resource Division RTOR000005/2024-2025 1724/P/DWSD 10/12/2024 Resource Division 8.51 0.00 0 0
5546 PURBA BARDHAMAN Ausgram - I Central Mechanical AUSGRAM PIPED WATER SUPPLY SCHEME , SM/14905 New ADDITIONAL QUOTATION FOR AUSGRAM PWSS P.H-2 BILL/01281/2024-2025 BP-2024-25-423 31/01/2025 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 0.14 0.00 0 null
5547 PURBA BARDHAMAN Ausgram - I Central Mechanical AUSGRAM PIPED WATER SUPPLY SCHEME , SM/14905 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at Ausgram Water Supply Scheme [ Block-Ausgram-1 ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. Driller In-Charge JUNIOR ENGINEER ORD/000744/2023-2024 4054/CMD 29/08/2023 614 MENAKA ENTERPRISE. 27.75 0.00 0 48
5548 PURBA BARDHAMAN Ausgram - I Durgapur W/S Division AUSGRAM PIPED WATER SUPPLY SCHEME , SM/14905 New FORMAL WORK ORDER FOR Balance and additional works for sinking of 300X200 mm dia X 210 mtr deapth RRM Tube well and laying pipe line (LDS),FHTC, Construction of Switch Room,Pump House,Inter Connection along with road restoration and construction of Boundary wall for head worksites and other allieds work related to JJM (7 Nos PWSS) i.e. Aushgram PWSS, Jalkandar and Bhuyera PWSS, Karatia PWSS, Khandari PWSS, Pichkuri PWSS, Shibda PWSS under Aushgram-I and II,Galsi-I and II Block under DURGAPUR W/S DIVISION,PHE Dte. Assistant Engineer-I,Assistant Engineer-II Contractual Junior Engineer_1,Contractual Junior Engineer_2,Contractual Junior Engineer_3,Contractual Junior Engineer_4,Contractual Junior Engineer_5,JUNIOR ENGINEER-1,JUNIOR ENGINEER-2,Junior Engineer_3 ORD/000286/2024-2025 493/DWSD 19/03/2025 185 MANASH GHOSH 745.87 0.00 0 0
5549 PURBA BARDHAMAN Ausgram - I Durgapur W/S Division AUSGRAM PIPED WATER SUPPLY SCHEME , SM/14905 New Material Requisition To Resource Division RTOR000031/2024-2025 451/DWSD 17/03/2025 Resource Division 0.14 0.00 0 0
5550 PURBA BARDHAMAN Ketugram - II Burdwan Division SHIBLUN PIPE WATER SUPPLY SCHEME , SM/14972 New Material Requisition To Resource Division RTOR000065/2023-2024 1962/BWD 25/04/2023 Resource Division 1.10 0.00 0 0
5551 PURBA BARDHAMAN Ketugram - II Burdwan Division SHIBLUN PIPE WATER SUPPLY SCHEME , SM/14972 New Material Requisition To Resource Division RTOR000163/2023-2024 2155/BWD 10/05/2023 Resource Division 75.98 0.00 0 0
5552 PURBA BARDHAMAN Ketugram - II Central Mechanical SHIBLUN PIPE WATER SUPPLY SCHEME , SM/14972 New New service connection charges for Shiblun PWSS TW-2 BILL/01355/2023-2024 BP-2023-24-133 22/08/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 4.04 0.00 0 0
5553 PURBA BARDHAMAN Ketugram - II Burdwan Division SHIBLUN PIPE WATER SUPPLY SCHEME , SM/14972 New Material Requisition To Resource Division RTOR000487/2023-2024 4011/BWD 08/09/2023 Resource Division 1.10 0.00 0 0
5554 PURBA BARDHAMAN Ketugram - II Burdwan Division SHIBLUN PIPE WATER SUPPLY SCHEME , SM/14972 New Material Requisition To Resource Division RTOR000759/2023-2024 5246/BWD 30/11/2023 Resource Division 18.90 0.00 0 0
5555 PURBA BARDHAMAN Ketugram - II Central Mechanical SHIBLUN PIPE WATER SUPPLY SCHEME , SM/14972 New New service connection charges for Shiblun PWSS TW-1 BILL/01898/2023-2024 BP-2023-24-368 15/01/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 7.19 0.00 0 0
5556 PURBA BARDHAMAN Ketugram - II Central Mechanical SHIBLUN PIPE WATER SUPPLY SCHEME , SM/14972 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at Shiblun Water Supply Scheme [ Block- Ketugram-2 ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. Driller In-Charge Junior Engineer ORD/000490/2023-2024 3798/CMD 10/08/2023 30 S.P. CONSTRUCTION 26.96 0.00 0 48
5557 PURBA BARDHAMAN Ketugram - II Central Mechanical SHIBLUN PIPE WATER SUPPLY SCHEME , SM/14972 New REVISED QUOTATION FOR NEW SERVICE CONNECTION AT SHIBLUN PWSS TW-1 BILL/00369/2024-2025 BP-2024-25-190 08/07/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 7.19 0.00 0 0
5558 PURBA BARDHAMAN Ketugram - II Central Mechanical SHIBLUN PIPE WATER SUPPLY SCHEME , SM/14972 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Kankurhati & others water supply scheme under Ketugram-2 Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. Driller In-Charge Junior Engineer ORD/000103/2024-2025 2408/CMD 02/08/2024 90 DIPALI CONSTRUCTION 41.95 0.00 0 0
5559 PURBA BARDHAMAN Ketugram - II Burdwan Division SHIBLUN PIPE WATER SUPPLY SCHEME , SM/14972 New Different works related (sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of different capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site) to CHARKHI & SHIBNUL Piped Water Supply Scheme under KETUGRAM-II Block, District:- Purba Bardhaman [NEW SCHEME] Assistant Engineer JUNIOR ENGINEER KATWA SUB-DIVISION PHE DTE,JUNIOR ENGINEER R.W.S. BURDWAN SUB-DIVISION PHE DTE ORD/000049/2023-2024 1823/BWD 18/04/2023 928 PASCON 723.75 0.00 0 35
5560 PURBA BARDHAMAN Ketugram - II Burdwan Division SHIBLUN PIPE WATER SUPPLY SCHEME , SM/14972 New Balance work for OHR, extension of pipeline to provide FHTC with land development, plinth protection for pump house & OHR under SIBLUN PWSS, Block-Ketugram-II under Katwa Sub Division within Burdwan Division PHE Dte. Assistant Engineer JUNIOR ENGINEER KATWA SUB-DIVISION PHE DTE ORD/000311/2024-2025 2835/BWD 19/07/2024 286 PASCON 84.02 0.00 0 80
5561 PURBA BARDHAMAN Mangolkote Burdwan Division GOHAGRAM PIPED WATER SUPPLY SCHEME , SM/14910 New Material Requisition To Resource Division RTOR000058/2022-2023 1244/BWD 17/03/2023 Resource Division 7.44 0.00 0 0
5562 PURBA BARDHAMAN Mangolkote Burdwan Division GOHAGRAM PIPED WATER SUPPLY SCHEME , SM/14910 New Material Requisition To Resource Division RTOR000110/2023-2024 1965/BWD 26/04/2023 Resource Division 2.89 0.00 0 0
5563 PURBA BARDHAMAN Mangolkote Central Mechanical GOHAGRAM PIPED WATER SUPPLY SCHEME , SM/14910 New New service connection charges of Gohagram W/S Scheme TW-2 BILL/00690/2023-2024 BP-2023-24-32 26/06/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 4.55 0.00 0 0
5564 PURBA BARDHAMAN Mangolkote Burdwan Division GOHAGRAM PIPED WATER SUPPLY SCHEME , SM/14910 New Material Requisition To Resource Division RTOR000810/2023-2024 300/BWD 24/01/2024 Resource Division 20.47 0.00 0 0
5565 PURBA BARDHAMAN Mangolkote Central Mechanical GOHAGRAM PIPED WATER SUPPLY SCHEME , SM/14910 New NEW SERVICE CONNECTION FOR GOHAGRAM PWSS TW 1. BILL/02489/2023-2024 BP-2023-24-539 15/02/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 4.94 0.00 0 0
5566 PURBA BARDHAMAN Mangolkote Burdwan Division GOHAGRAM PIPED WATER SUPPLY SCHEME , SM/14910 New Different works related (sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of different capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site) to GOHAGRAM, KHERUA & JABAGRAM Piped Water Supply Scheme under Mangalkote Block, District:- Purba Bardhaman [NEW SCHEME] Assistant Engineer JUNIOR ENGINEER KATWA SUB-DIVISION PHE DTE,JUNIOR ENGINEER R.W.S. BURDWAN SUB-DIVISION PHE DTE ORD/000697/2022-2023 582/BWD 17/02/2023 365 PUSPA ENTERPRISE 1,185.88 159.81 13.48 73
5567 PURBA BARDHAMAN Mangolkote Central Mechanical GOHAGRAM PIPED WATER SUPPLY SCHEME , SM/14910 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Jabagram & others water supply scheme under Mangalkote Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. Driller In-Charge Junior Engineer ORD/000118/2024-2025 2590/CMD 27/08/2024 90 M/S SAJAHAN CHOWDHURY 62.06 0.00 0 0
5568 PURBA BARDHAMAN Mangolkote Burdwan Division GOHAGRAM PIPED WATER SUPPLY SCHEME , SM/14910 New Balance works for different type of works in connection with Jaggeswardihi PWSS, Deulia PWSS, Kunda PWSS and Gohagram PWSS Under Mongalkote Block within Katwa Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer ORD/001186/2024-2025 593/BWD 07/02/2025 120 MD HASIN 203.38 0.00 0 0
5569 PURBA BARDHAMAN Mangolkote Burdwan Division GOHAGRAM PIPED WATER SUPPLY SCHEME , SM/14910 New Different types of works involve in connection with implementation of Gohgram, Jabagram, Kherua, Lakshmipur & Simulia Piped Water Supply Scheme under Mongolkote Block within Katwa Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer ORD/001301/2024-2025 936/BWD 11/03/2025 180 M/S GHOSH CONSTRUCTION 360.68 0.00 0 0
5570 PURBA BARDHAMAN Mangolkote Central Mechanical GOHAGRAM PIPED WATER SUPPLY SCHEME , SM/14910 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at GOHAGRAM Water Supply Scheme [ Block- MANGALKOTE] under CMD, PHE Dte., Dist.- Purba-Bardhaman. Driller In-Charge Junior Engineer ORD/000123/2023-2024 2640/CMD 14/06/2023 740 CHOUDHURY ENTERPRISE 27.48 0.00 0 82
5571 PURBA BARDHAMAN Mangolkote Central Mechanical GOHAGRAM PIPED WATER SUPPLY SCHEME , SM/14910 New Supply and delivery of 10 HP pump motor set at T.W. No - 1 of Gohagram water supply scheme under CMD, PHE Dte. Driller In-Charge JUNIOR ENGINEER ORD/000842/2024-2025 930/DIC/BMSD(D) 27/12/2024 7 CHOUDHURY ENTERPRISE 0.81 0.00 0 100
5572 PURBA BARDHAMAN Mangolkote Burdwan Division LAKHURIA PIPE WATER SUPPLY SCHEME , SM/14918 New Material Requisition To Resource Division RTOR000114/2023-2024 1965/BWD 26/04/2023 Resource Division 1.64 0.00 0 0
5573 PURBA BARDHAMAN Mangolkote Burdwan Division LAKHURIA PIPE WATER SUPPLY SCHEME , SM/14918 New Material Requisition To Resource Division RTOR000393/2023-2024 2197/BWD 12/05/2023 Resource Division 5.83 0.00 0 0
5574 PURBA BARDHAMAN Mangolkote Burdwan Division LAKHURIA PIPE WATER SUPPLY SCHEME , SM/14918 New Material Requisition To Resource Division RTOR000814/2023-2024 295/BWD 24/01/2024 Resource Division 20.47 0.00 0 0
5575 PURBA BARDHAMAN Mangolkote Burdwan Division LAKHURIA PIPE WATER SUPPLY SCHEME , SM/14918 New LAKHURIA Piped Water Supply Scheme with sinking of Tube-well, LDS, Construction of 150 cum RCC OHR with 20 mtr. staging height including soil testing, Rising Main, FHTC & construction of switch rooms & boundary walls with gates and land development, drain and internal pathway at different TW site under Mangolkote Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer JUNIOR ENGINEER R.W.S. BURDWAN SUB-DIVISION PHE DTE ORD/000526/2023-2024 3619/BWD 18/08/2023 365 SK ABDUL LALAN 317.51 15.64 4.93 53
5576 PURBA BARDHAMAN Mangolkote Central Mechanical LAKHURIA PIPE WATER SUPPLY SCHEME , SM/14918 New Quotation for new service connection at Lakhuria PWSS PH-2. BILL/00345/2024-2025 BP-2024-25-166 01/07/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 6.69 0.00 0 0
5577 PURBA BARDHAMAN Mangolkote Central Mechanical LAKHURIA PIPE WATER SUPPLY SCHEME , SM/14918 New Quotation for new service connection at Lakhuria PWSS PH-I. BILL/00342/2024-2025 BP-2024-25-165 01/07/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.70 0.00 0 0
5578 PURBA BARDHAMAN Mangolkote Burdwan Division LAKHURIA PIPE WATER SUPPLY SCHEME , SM/14918 New Continuation Work Order for Supply of 1 (one) No. Inspection Vehicle for different JJM Related Works as and when required including supply of driver and fuels (Minimum 8 Hours of duty) under Katwa Sub-Division within Burdwan Division, P.H.E. Dte. Consider 96.00 Km run per Day Assistant Engineer JUNIOR ENGINEER KATWA SUB-DIVISION PHE DTE ORD/000107/2024-2025 485/KTS 16/04/2024 72 AJIT SAMANTA 0.92 0.00 0 10
5579 PURBA BARDHAMAN Mangolkote Central Mechanical LAKHURIA PIPE WATER SUPPLY SCHEME , SM/14918 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Jabagram & others water supply scheme under Mangalkote Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. Driller In-Charge Junior Engineer ORD/000118/2024-2025 2590/CMD 27/08/2024 90 M/S SAJAHAN CHOWDHURY 62.06 0.00 0 0
5580 PURBA BARDHAMAN Mangolkote Burdwan Division LAKHURIA PIPE WATER SUPPLY SCHEME , SM/14918 New Material Requisition To Resource Division RTOR000075/2024-2025 401/BWD 17/01/2025 Resource Division 2.45 0.00 0 0
5581 PURBA BARDHAMAN Mangolkote Central Mechanical LAKHURIA PIPE WATER SUPPLY SCHEME , SM/14918 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at Lakhuria Water Supply Scheme [ Block- MONGOLKOTE] under CMD, PHE Dte., Dist.- Purba-Bardhaman. Driller In-Charge Junior Engineer ORD/000769/2023-2024 4067/CMD 29/08/2023 640 GLACIER ENGINEERING CO 26.98 10.58 39.21 43
5582 PURBA BARDHAMAN Mangolkote Central Mechanical LAKHURIA PIPE WATER SUPPLY SCHEME , SM/14918 New Additional Quotation for Lakhuria TW 2 BILL/01290/2024-2025 BP-2024-25-426 31/01/2025 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 1.70 0.00 0 null
5583 PURBA BARDHAMAN Mangolkote Central Mechanical LAKHURIA PIPE WATER SUPPLY SCHEME , SM/14918 New Addl. Qtn in second time for Lakhuria TW 1 BILL/01394/2024-2025 BP-2024-25-443 18/03/2025 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 0.88 0.00 0 null
5584 PURBA BARDHAMAN Burdwan Division Augmentation of Ganganandapur PWSS for providing FHTC. , SM/09411 Augmentation Supply of materials for different water supply scheme under Burdwan Division, PHE Dte. VCH/001578/2021-2022 1207/DW 10/03/2022 EXECUTIVE ENGINEER, RESOURCES DIVISION, P.H.E. DTE. 3,005.00 0.00 0 0
5585 PURBA BARDHAMAN Burdwan Division Augmentation of Ganganandapur PWSS for providing FHTC. , SM/09411 Augmentation Preparation of DPR for augmentation of Ganganandapur W/S Scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. (Sl No-E) Assistant Engineer ORD/000571/2021-2022 207/KSD 23/02/2022 21 ROY CHOWDHURY ASSOCIATES 2.84 2.82 99.3 1
5586 PURBA BARDHAMAN Burdwan Division Augmentation of Ganganandapur PWSS for providing FHTC. , SM/09411 Augmentation Interconnection of rising main from 2nd Tube Well site and renovation of boundary wall and pump house at 2nd Tube Well Site of Ganganandapur W/S Scheme within Kalna Sub-Division under Burdwan Division , PHE Dte. (Sl No-C) Assistant Engineer ORD/000449/2021-2022 88/KSD 21/01/2022 30 ER CONSTRUCTION & GENERAL ORDER SUPPLIER 1.20 0.86 71.67 1
5587 PURBA BARDHAMAN Burdwan Division Augmentation of Ganganandapur PWSS for providing FHTC. , SM/09411 Augmentation Supply and delivery of different dia. CIDF sluice valve for Augmentation of Jahannagar, Ganganandapur, Nowapara & Monteswar Piped Water Supply Scheme within Kalna Sub-Division under Burdwan Division, P.H.E. Dte.[Part ¿ A] Assistant Engineer ORD/000323/2022-2023 3632/BWD 22/08/2022 20 RAMASISH ENTERPRISE 12.80 0.00 0 1
5588 PURBA BARDHAMAN Burdwan Division Augmentation of Ganganandapur PWSS for providing FHTC. , SM/09411 Augmentation Sinking of additional 250 X 150mm dia Tube Well 150 mtr. Depth by D.R. Rig method using UPVC pipe (CD) and UPVC Deep Well Screen (RDS) for GANGANANDAPUR Piped Water Supply Scheme, Block - Purbasthali - I, Dist - Purba Bardhaman under Burdwan Division, PHE Dte. Assistant Engineer ORD/000070/2022-2023 2424/BWD 11/05/2022 30 M/S SYCHROTECH INDUSTRY 9.01 8.47 94.01 0
5589 PURBA BARDHAMAN Burdwan Division Augmentation of Ganganandapur PWSS for providing FHTC. , SM/09411 Augmentation Quotation from WBSEDCL for new service connection of Ganganandapur w/s scheme. T.W.-3 BILL/00401/2023-2024 537/JJM 21/08/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LTD. 6.60 0.00 0 0
5590 PURBA BARDHAMAN Burdwan Division Augmentation of Ganganandapur PWSS for providing FHTC. , SM/09411 Augmentation Construction of Pump House cum switch room (5.40 mtr x 3.60 mtr) with sanitary arrangement (as per drawing no. PHE/SE/CC/PH/DWG-01/2022-2023) at GANGANANDAPUR Water Supply Scheme within Kalna Sub-Divn. under Burdwan Division, PHE Dte. Dist.-Purba Bardhaman. ORD/000708/2023-2024 4481/BWD 11/10/2023 60 LOKNATH ENTERPRISE 6.31 0.00 0 0
5591 PURBA BARDHAMAN Burdwan Division Augmentation of Ganganandapur PWSS for providing FHTC. , SM/09411 Augmentation Material Requisition To Resource Division RTOR000081/2021-2022 603/BWD 28/01/2022 Resource Division 24.12 0.00 0 0
5592 PURBA BARDHAMAN Burdwan Division Augmentation of Ganganandapur PWSS for providing FHTC. , SM/09411 Augmentation Material Requisition To Resource Division RTOR000036/2021-2022 553/BWD 27/01/2022 Resource Division 18.08 0.00 0 0
5593 PURBA BARDHAMAN Burdwan Division Augmentation of Ganganandapur PWSS for providing FHTC. , SM/09411 Augmentation Material Requisition To Resource Division RTOR000201/2021-2022 1524/BWD 15/03/2022 Resource Division 0.37 0.00 0 0
5594 PURBA BARDHAMAN Burdwan Division Augmentation of Ganganandapur PWSS for providing FHTC. , SM/09411 Augmentation Material Requisition To Resource Division RTOR000105/2021-2022 952/BWD 17/02/2022 Resource Division 74.99 0.00 0 0
5595 PURBA BARDHAMAN Burdwan Division Augmentation of Ganganandapur PWSS for providing FHTC. , SM/09411 Augmentation Material Requisition To Resource Division RTOR000042/2022-2023 4626/BWD 17/10/2022 Resource Division 18.48 0.00 0 0
5596 PURBA BARDHAMAN Central Mechanical Augmentation of Ganganandapur PWSS for providing FHTC. , SM/09411 Augmentation Supply & Installation of Submersible Pumping Machinery , Voltage Stabilizer, Chlorination system and internal House wiring for Tube well no.- 1 at Augumentation of Ganganandapur Water Supply Scheme under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000073/2023-2024 2562/CMD 06/06/2023 30 SUDIPTA GHOSH 10.98 0.00 0 95
5597 PURBA BARDHAMAN Burdwan Division Augmentation of Ganganandapur PWSS for providing FHTC. , SM/09411 Augmentation Work Order for " Renovation of Pump house along with laboratory building of Ganganandapur piped water supply scheme in connection with Augmentation of Ganganandapur Piped Water Supply Scheme under Burdwan Division, PHE Dte." Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000135/2024-2025 318/KSD 07/06/2024 30 ER CONSTRUCTION & GENERAL ORDER SUPPLIER 4.31 0.00 0 100
5598 PURBA BARDHAMAN Burdwan Division Augmentation of Ganganandapur PWSS for providing FHTC. , SM/09411 Augmentation Additional works to implement the GANGANANDAPUR Piped Water Supply Scheme under Purbasthali-I Block, Dist :- Purba Bardhaman under Burdwan Division, PHE. Dte. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000707/2022-2023 754/BWD 23/02/2023 60 MANASH GHOSH 76.57 67.88 88.65 85
5599 PURBA BARDHAMAN Burdwan Division Augmentation of Ganganandapur PWSS for providing FHTC. , SM/09411 Augmentation Digital structurization of pipeline alignment and asset evaluation including holistic design, preparation of design drawings of overall LDS & preparation of estimate for 14 Nos. Piped W/S. Schemes under Purbasthali I Block under Kalna Sub-Division under Burdwan Division, PHE. Dte. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000337/2024-2025 3017/BWD 05/08/2024 75 HORIZEN 38.00 7.60 20 100
5600 PURBA BARDHAMAN Burdwan Division Augmentation of Ganganandapur PWSS for providing FHTC. , SM/09411 Augmentation Work Order for "Additional work in connection with renovation of Pump house and laboratory building of Ganganandapur piped water supply scheme in connection with Augmentation of Ganganandapur Piped Water Supply Scheme under Burdwan Division, PHE Dte." Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000136/2024-2025 319/KSD 07/06/2024 30 ER CONSTRUCTION & GENERAL ORDER SUPPLIER 3.83 0.00 0 100
5601 PURBA BARDHAMAN Burdwan Division Augmentation of Ganganandapur PWSS for providing FHTC. , SM/09411 Augmentation Laying of rising main along with crossing of pipeline by HDD/Jack pushing method with other allied work in connection with augmentation of Ganganandapur PWSS (SM/09411) & Rajapur PWSS (SM/ 14021), Purbasthali-I block under Kalna Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000278/2024-2025 2710/BWD 11/07/2024 264 MANASH GHOSH 81.34 0.00 0 60
5602 PURBA BARDHAMAN Burdwan Division Augmentation of Ganganandapur PWSS for providing FHTC. , SM/09411 Augmentation Renovation of Pump House in connection with Augmentation of Ganganandapur piped Water supply (SM/09411) Scheme under Kalna Sub-Division under Burdwan Division, PHE Dte. (2 Nos Pump House Repairing) Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000748/2024-2025 3748/BWD 29/10/2024 30 ER CONSTRUCTION & GENERAL ORDER SUPPLIER 9.70 0.00 0 100
5603 PURBA BARDHAMAN Burdwan Division Augmentation of Ganganandapur PWSS for providing FHTC. , SM/09411 Augmentation Work Order for "Supervision and extend support to NABL recognised Water Quality Testing Block level Laboratory under The Assistant Engineer, Kalna Sub- Division, Public Health Engineering Directorate, Government of West Bengal by assigining team of competent resource personnel who will be engeged for complete supervision for retaining NABL recognition and compilation of preparatory up-to-date documentation,Calibration for on-site survelliance by NABL (as per NABL 139) for a period of one month from the date of commencement. (Name of SDL : Ganganandapur Sub District Water Testing Laboratory under Kalna Sub Division)". Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE,JUNIOR ENGINEER R.W.S. BURDWAN SUB-DIVISION PHE DTE ORD/000671/2023-2024 1334/KSD 28/08/2023 30 BHARATI CHEMICAL & SCIENTIFIC WORKS 0.51 0.00 0 1
5604 PURBA BARDHAMAN Burdwan Division Augmentation of Ganganandapur PWSS for providing FHTC. , SM/09411 Augmentation Work Order for " Renovation of boundary wall in connection with Augmentation of Ganganandapur Water Supply Scheme (SM/09411) within Kalna Sub-Division under Burdwan Division, PHE Dte. (Length - 170 Mtr). - 2 Nos". Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000801/2024-2025 1778/KSD 20/11/2024 30 UNIQUE CONSTRUCTION 4.55 0.00 0 100
5605 PURBA BARDHAMAN Burdwan Division Augmentation of Ganganandapur PWSS for providing FHTC. , SM/09411 Augmentation Work order for "Construction of Toilet (1.8 m x 1.8 m) with saitary arrangement along with other allied works at PH No-3 of Ganganandapur pwss (SM/09411) under Kalna sub division under Burdwan Division.". Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/001321/2024-2025 303/KSD 25/02/2025 30 DUTTA CONSTRUCTION & CONSULTANCY 2.45 0.00 0 0
5606 PURBA BARDHAMAN Burdwan Division Augmentation of Ganganandapur PWSS for providing FHTC. , SM/09411 Augmentation Augmentation of GANGANANDAPUR Piped Water Supply Scheme with LDS, FHTC, Rising Main, Construction of 300 Cum capacity OHR with 20.0 Mtr. Staging height inclusive of soil investigation & construction of pump house ( 3.60mx 3.0m) & boundary wall at new TW site under Purbasthali ¿ I Block, District - Purba Bardhaman. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000019/2022-2023 2013/BWD 18/04/2022 1020 MANASH GHOSH 421.40 377.79 89.65 70
5607 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF PURBASTHALI SURFACE WATER BASED PWSS ZONE III , SM/15588 Augmentation Material Requisition To Resource Division RTOR000517/2023-2024 3969/BWD 08/09/2023 Resource Division 28.36 0.00 0 0
5608 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF PURBASTHALI SURFACE WATER BASED PWSS ZONE III , SM/15588 Augmentation Material Requisition To Resource Division RTOR000763/2023-2024 197/BWD 10/01/2024 Resource Division 6.16 0.00 0 0
5609 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF PURBASTHALI SURFACE WATER BASED PWSS ZONE III , SM/15588 Augmentation Augmentation of PURBASTHALI Surface Water Supply Scheme (ZONE-3A) with LDS, Rising Main, FHTC, Construction of 500 cum capacity RCC OHR with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drain and internal pathway at different TW site under Purbasthali-II Block, District:- Purba-Bardhaman. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000537/2023-2024 3701/BWD 24/08/2023 365 SUPRITI ENTERPRISE 560.35 0.00 0 1
5610 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF PURBASTHALI SURFACE WATER BASED PWSS ZONE III , SM/15588 Augmentation Work Order for "Route Survey & Prepatration of DPR for Augmentation of Purbasthali Surface Water Based PWSS Zone-III (Zone-III A) (SM/15588) under Kalna Sub-Division under Burdwan Division, PHE Dte." (SL-4) Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/001137/2023-2024 2079/KSD 29/02/2024 45 APEX ENGINEERING 2.27 0.00 0 100
5611 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF PURBASTHALI SURFACE WATER BASED PWSS ZONE III , SM/15588 Augmentation Supply & Laying of 300mm Dia M.S.E.R.W Pipe including Jack Pushing along with other allied work in connection with different Augmentation & New [(SM/18439, SM/14437, SM/14435, SM/07805, SM/14440, SM/15571, SM/08030, SM/16014, SM/15588, SM/16298 & SM/16307)] under Kalna Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/001187/2024-2025 608/BWD 11/02/2025 180 MANASH GHOSH 1,209.62 0.00 0 0
5612 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF PURBASTHALI SURFACE WATER BASED PWSS ZONE III , SM/15588 Augmentation Construction of protection wall along with reconstruction of boundary wall (Damaged portion due to land slide along the pond side) and other allied work at Surface Water Based Water Supply Scheme (Zone - 3) Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/001298/2024-2025 913/BWD 10/03/2025 30 MONDAL & CO. 17.92 0.00 0 0
5613 PURBA BARDHAMAN Raina - II Burdwan Division Pipuldaha Piped Water Supply Scheme , SM/15488 New Material Requisition To Resource Division RTOR000371/2023-2024 2197/BWD 12/05/2023 Resource Division 3.55 0.00 0 0
5614 PURBA BARDHAMAN Raina - II Burdwan Division Pipuldaha Piped Water Supply Scheme , SM/15488 New Material Requisition To Resource Division RTOR000417/2023-2024 3865/BWD 01/09/2023 Resource Division 20.78 0.00 0 0
5615 PURBA BARDHAMAN Raina - II Burdwan Division Pipuldaha Piped Water Supply Scheme , SM/15488 New Material Requisition To Resource Division RTOR000687/2023-2024 5078/BWD 23/11/2023 Resource Division 20.46 0.00 0 0
5616 PURBA BARDHAMAN Raina - II Central Mechanical Pipuldaha Piped Water Supply Scheme , SM/15488 New New electric connection for Pipuldaha PWSS, PH-1. BILL/01883/2023-2024 BP-2023-24-345 11/01/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.76 0.00 0 0
5617 PURBA BARDHAMAN Raina - II Central Mechanical Pipuldaha Piped Water Supply Scheme , SM/15488 New New electric connection for Pipuldaha PWSS. BILL/01868/2023-2024 BP-2023-24-346 11/01/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 7.54 0.00 0 0
5618 PURBA BARDHAMAN Raina - II Burdwan Division Pipuldaha Piped Water Supply Scheme , SM/15488 New Continuation work order for "Supply of one No. Diesel Driven Ambassador Car on hire basis for the office of the Assistant Engineer, Burdwan Sub-Division, PHE Dte. (Period from 01-06-2024 to 31-08-2024" JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000228/2024-2025 918/BSD 28/05/2024 92 SK. ASFIA 1.20 0.00 0 60
5619 PURBA BARDHAMAN Raina - II Central Mechanical Pipuldaha Piped Water Supply Scheme , SM/15488 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at Pipuldaha Water Supply Scheme [ Block- Raina-2 ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000728/2023-2024 4039/CMD 29/08/2023 30 ANANTA ELECTRICAL ENGINEERING CONSTRUCTION 28.94 0.00 0 50
5620 PURBA BARDHAMAN Raina - II Central Mechanical Pipuldaha Piped Water Supply Scheme , SM/15488 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Satinandi,Sanko & others water supply scheme under Galsi-1 Block ; Serpur, Uchalan & others water supply scheme under Raina-2 Block and maro, loapur & others water supply scheme under Galsi-2 block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000397/2024-2025 2751/CMD 24/09/2024 90 ORIENTAL ENGINEERING CO. 88.42 0.00 0 0
5621 PURBA BARDHAMAN Raina - II Central Mechanical Pipuldaha Piped Water Supply Scheme , SM/15488 New Continuation Order- Hiring of inspection vehicle (Diesel /CNG/LPG Driven) for supervision of site for the office of Assistant Engineer under CMD,PHE,Dte. [W.E.F-30.04.2024 to 28.06.2024 ] ASSISTANT ENGINEER Junior Engineer ORD/000423/2024-2025 703/CMSD 29/04/2024 60 SUBRATA BHADRA 0.79 0.00 0 0
5622 PURBA BARDHAMAN Raina - II Burdwan Division Pipuldaha Piped Water Supply Scheme , SM/15488 New PIPULDAHA Piped Water Supply Scheme with sinking of Tube-well, LDS, Rising Main, FHTC, Construction of 350 cum capacity RCC OHR with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drain and internal pathway at different TW site under Raina-II Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000458/2023-2024 3440/BWD 08/08/2023 657 SK ABDUL HALIM 644.77 0.00 0 60
5623 PURBA BARDHAMAN Raina - II Burdwan Division Pipuldaha Piped Water Supply Scheme , SM/15488 New Material Requisition To Resource Division RTOR000023/2024-2025 308/BWD 15/01/2025 Resource Division 12.71 0.00 0 0
5624 PURBA BARDHAMAN Raina - II Burdwan Division Pipuldaha Piped Water Supply Scheme , SM/15488 New Continuation Work Order for supply of inspection Vehicle for inspection of different JJM related (schemes)works as and when required including supply of driver & fuel(minimum 8 hours duty per day) and all taxes etc. for Burdwan Sub-Division under Burdwan Division,PHE Dte consider 96.00 Km. run per day (Period from 01-11-2024 to 31-01-2025) JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000896/2024-2025 2438/BSD 29/10/2024 66 PARVIN BEGAM 0.85 0.28 32.94 0
5625 PURBA BARDHAMAN Raina - II Burdwan Division Chaudanga Piped Water Supply Scheme , SM/15489 New Material Requisition To Resource Division RTOR000303/2023-2024 2197/BWD 12/05/2023 Resource Division 12.30 0.00 0 0
5626 PURBA BARDHAMAN Raina - II Burdwan Division Chaudanga Piped Water Supply Scheme , SM/15489 New Material Requisition To Resource Division RTOR000419/2023-2024 3863/BWD 01/09/2023 Resource Division 3.95 0.00 0 0
5627 PURBA BARDHAMAN Raina - II Burdwan Division Chaudanga Piped Water Supply Scheme , SM/15489 New Material Requisition To Resource Division RTOR000662/2023-2024 5082/BWD 23/11/2023 Resource Division 20.46 0.00 0 0
5628 PURBA BARDHAMAN Raina - II Central Mechanical Chaudanga Piped Water Supply Scheme , SM/15489 New New electric connection for Chuadanga PWSS, PH-2. BILL/01885/2023-2024 BP-2023-24-348 11/01/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 4.13 0.00 0 0
5629 PURBA BARDHAMAN Raina - II Central Mechanical Chaudanga Piped Water Supply Scheme , SM/15489 New New electric connection for Chaudanga PWSS, PH-1. BILL/01884/2023-2024 BP-2023-24-347 11/01/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 2.67 0.00 0 0
5630 PURBA BARDHAMAN Raina - II Central Mechanical Chaudanga Piped Water Supply Scheme , SM/15489 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Satinandi,Sanko & others water supply scheme under Galsi-1 Block ; Serpur, Uchalan & others water supply scheme under Raina-2 Block and maro, loapur & others water supply scheme under Galsi-2 block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000397/2024-2025 2751/CMD 24/09/2024 90 ORIENTAL ENGINEERING CO. 88.42 0.00 0 0
5631 PURBA BARDHAMAN Raina - II Burdwan Division Chaudanga Piped Water Supply Scheme , SM/15489 New Continuation work order for "Supply of one No. Diesel Driven Ambassador Car on hire basis for the office of the Assistant Engineer, Burdwan Sub-Division, PHE Dte. (Period from 01-09-2024 to 30-11-2024 Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000682/2024-2025 1957/BSD 30/08/2024 91 SK. ASFIA 1.20 0.40 33.33 60
5632 PURBA BARDHAMAN Raina - II Burdwan Division Chaudanga Piped Water Supply Scheme , SM/15489 New Material Requisition To Resource Division RTOR000046/2024-2025 326/BWD 15/01/2025 Resource Division 6.15 0.00 0 0
5633 PURBA BARDHAMAN Raina - II Central Mechanical Chaudanga Piped Water Supply Scheme , SM/15489 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at CHAUDANGA Water Supply Scheme [ Block-RAINA-2] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000805/2023-2024 4090/CMD 29/08/2023 610 MS DAS ELECTRIC CO 28.98 0.00 0 50
5634 PURBA BARDHAMAN Raina - II Burdwan Division Chaudanga Piped Water Supply Scheme , SM/15489 New Different works related (sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of different capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site) to BARABAINAN & CHAUDANGA Piped Water Supply Scheme under Raina ¿ II Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000412/2023-2024 3257/BWD 27/07/2023 807 SK ALIM 1,144.16 0.00 0 55
5635 PURBA BARDHAMAN Burdwan Division RETROFITTING OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR DERIAPUR , SM/15195 Retrofitting Conducting physical Household Survey at the IMIS reported village for HGJ certification and providing balance FHTC for Har Ghar Jal certification including conducting Gram Sabhas for different IMIS reported villages across the district under Burdwan Division, PHE Dte. AE(HQs),Assistant Engineer ,Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE.,Assistant Engineer, Durgapur Sub Division, P.H.E. Dte JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000428/2024-2025 3107/BWD 12/08/2024 90 TUBGRAM GRAMMYAK UNNAYAN SAMITY 309.60 0.00 0 50
5636 PURBA BARDHAMAN Burdwan Division RETROFITTING OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR DERIAPUR , SM/15195 Retrofitting Quotation from WBSEDCL for new service connection of Deriapur PWSS. (P.H.-3) under Burdwan Division, PHE Dte. (Application ID-5004452105, dt.-28/10/2024) BILL/01154/2024-2025 1265/JJM 31/01/2025 WBSEDCL 8.35 0.00 0 null
5637 PURBA BARDHAMAN Burdwan Division RETROFITTING OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR DERIAPUR , SM/15195 Retrofitting Sinking of Tube Well, Construction of Pump House, Boundary Wall at 3rd TW Site with Extension of Pipeline & Laying Parallel line and Providing FHTC (Leftout] with allied works for DERIAPUR Piped Water Supply Scheme under Raina-I Block within Burdwan Sub Division under Burdwan Division P.H.E Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000177/2024-2025 2270/BWD 18/06/2024 317 ROY CONSTRUCTION 68.15 0.00 0 70
5638 PURBA BARDHAMAN Burdwan Division RETROFITTING OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR DERIAPUR , SM/15195 Retrofitting Extension Pipeline with Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of Astikpur, Dakhinkul & Balagar of DERIAPUR Piped Water Supply Scheme within Raina I Block of Burdwan Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000762/2022-2023 1296/BWD 21/03/2023 651 T.K. BANERJEE & CO. 68.81 43.07 62.59 100
5639 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF SUDPUR PIPED WATER SUPPLY SCHEME , SM/15573 Augmentation Balance work of OHR at Head Work site, construction of HUME Pipe culvert , Road restoration work and boundary wall at 2nd TW site with Gate, land development at Head work site and 2nd TW site under KAITHAN, SUDPUR & PANUHAT Piped Water Supply Scheme under KATWA -I Block, under Katwa Sub-Division within Burdwan Division, PHE Dte. Assistant Engineer JUNIOR ENGINEER KATWA SUB-DIVISION PHE DTE ORD/000486/2024-2025 3141/BWD 20/08/2024 120 VISHAL CONSTRUCTION CO. 126.29 15.96 12.64 50
5640 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF SUDPUR PIPED WATER SUPPLY SCHEME , SM/15573 Augmentation Augmentation of SUDPUR Piped Water Supply Scheme with sinking of Tube-well, LDS, Rising Main, FHTC, Construction of 450 cum capacity RCC OHR with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drain and internal pathway at different TW site under KATWA-II Block, District:- Purba-Bardhaman._2ND CALL Assistant Engineer JE RWS ORD/000658/2023-2024 4122/BWD 14/09/2023 365 INDIAN ENGINEERS CO.-OPERATIVE SOCIETY LTD. 442.27 0.00 0 15
5641 PURBA BARDHAMAN Central Mechanical AUGMENTATION OF SEHERA PWSS IN RAINA-I BLOCK , SM/15173 Augmentation Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination system and internal House wiring for Tube well no.- 1 & 2 at Augmentation of SEHERA( Part-B)[RAINA-I] Water Supply Scheme under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER Junior Engineer ORD/001076/2023-2024 4200/CMD 29/08/2023 30 AMUSAR IMPEX PVT. LTD. 24.39 0.00 0 0
5642 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF SEHERA PWSS IN RAINA-I BLOCK , SM/15173 Augmentation Functional Household Tap Connection (FHTC) for Sehera, Mogolmari, Kona Krishnapur village for Augmentation of SEHERA Piped Water Supply Scheme to provide house connection within Burdwan Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/001086/2023-2024 1112/BWD 13/03/2024 60 PAL CONSTRUCTION 35.49 0.00 0 0
5643 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF SEHERA PWSS IN RAINA-I BLOCK , SM/15173 Augmentation Providing leftout FHTC, Const. of Boundary Wall (HW Site & 2nd TW Site), Drain, Pathway and land development at Head Work site & 2nd TW Site (Replacement), Rising main connection of 2nd TW (Replacement) with necessary repairing work for SEHERA Piped Water Supply Scheme, Block- Raina-I, within Burdwan Sub Division under Burdwan Division PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/001017/2024-2025 63/BWD 06/01/2025 90 H SAMANTA 41.78 0.00 0 0
5644 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF SEHERA PWSS IN RAINA-I BLOCK , SM/15173 Augmentation Laying of Interconnection of Head work site New Tube well of Sehera Piped Water Supply Scheme within Burdwan Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. Junior Engineer1, Durgapur Sub-Division, PHE Dte. ORD/001276/2023-2024 738/BSD 20/04/2023 15 M/S UNIT CONSTRUCTION 0.95 0.00 0 100
5645 PURBA BARDHAMAN Central Mechanical AUGMENTATION OF SEHERA PWSS IN RAINA-I BLOCK , SM/15173 Augmentation Making illumination arrangement and mise works at Aug. of Sheherabazar water supply scheme RAINA-I BLOCK under Central Mechanical Division P.H.E. Dte. Purba-Bardhaman. ASSISTANT ENGINEER Junior Engineer ORD/000481/2024-2025 2952/CMD 20/11/2024 233 ELECTRICAL & MECHANICAL ENGINEERING CORPORATION 17.51 0.00 0 30
5646 PURBA BARDHAMAN Durgapur W/S Division AUGUMENTATION OF AMRARGAR PIPED WATER SUPPLY SCHEME , SM/15176 Augmentation Formal Work Order for Source Augmentation of Amarargarh Piped Water Supply Scheme [Tube Well, Pump House, Bounday Wall, Rising Main, FHTC etc], Block- Ausgram-II, Dist- purba Bardhaman under Durgapur W/S Division, PHE Dte Assistant Engineer-II Contractual Junior Engineer_2 ORD/000104/2024-2025 1014/DWSD 16/07/2024 120 BIPLAB GUHA 109.16 0.00 0 70
5647 PURBA BARDHAMAN Central Mechanical AUGUMENTATION OF AMRARGAR PIPED WATER SUPPLY SCHEME , SM/15176 Augmentation Quotation for new service connection at Amragarah PWSS TW-2 (Aug). BILL/00899/2024-2025 BP-2024-25-338 04/10/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.59 0.00 0 0
5648 PURBA BARDHAMAN Central Mechanical AUGUMENTATION OF AMRARGAR PIPED WATER SUPPLY SCHEME , SM/15176 Augmentation Making illumination arrangement and mise works at AMRARGARH and adjacent water supply scheme ausgram-II BLOCK under Central Mechanical Division P.H.E. Dte. Purba-Bardhaman. Driller In-Charge Junior Engineer ORD/000477/2024-2025 2955/CMD 20/11/2024 60 A.S. ENTERPRISE 22.81 0.00 0 0
5649 PURBA BARDHAMAN Central Mechanical AUGUMENTATION OF AMRARGAR PIPED WATER SUPPLY SCHEME , SM/15176 Augmentation Quotation for new service connection at Amragarh PWSS TW-3 BILL/01091/2024-2025 BP-2024-25-401 22/11/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 9.49 0.00 0 0
5650 PURBA BARDHAMAN Central Mechanical AUGUMENTATION OF AMRARGAR PIPED WATER SUPPLY SCHEME , SM/15176 Augmentation Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination system and internal House wiring for Tube well no.- 1 & 2 at Augmentation of AMRARGARH[AUSGRAM-II] Water Supply Scheme under CMD, PHE Dte., Dist.- Purba-Bardhaman. Driller In-Charge Junior Engineer ORD/001086/2023-2024 4509/CMD 06/10/2023 605 S.K. ENTERPRISE 24.39 0.00 0 80
5651 PURBA BARDHAMAN Raina - I Burdwan Division SHUKUR PIPED WATER SUPPLY SCHEME , SM/16255 New Material Requisition To Resource Division RTOR000314/2023-2024 2197/BWD 12/05/2023 Resource Division 5.01 0.00 0 0
5652 PURBA BARDHAMAN Raina - I Burdwan Division SHUKUR PIPED WATER SUPPLY SCHEME , SM/16255 New Material Requisition To Resource Division RTOR000480/2023-2024 4004/BWD 08/09/2023 Resource Division 7.71 0.00 0 0
5653 PURBA BARDHAMAN Raina - I Burdwan Division SHUKUR PIPED WATER SUPPLY SCHEME , SM/16255 New Material Requisition To Resource Division RTOR000693/2023-2024 5072/BWD 23/11/2023 Resource Division 20.46 0.00 0 0
5654 PURBA BARDHAMAN Raina - I Central Mechanical SHUKUR PIPED WATER SUPPLY SCHEME , SM/16255 New New service connection charges for Shukur PWSS TW-2 BILL/01762/2023-2024 BP-2023-24-272 15/12/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 4.71 0.00 0 0
5655 PURBA BARDHAMAN Raina - I Central Mechanical SHUKUR PIPED WATER SUPPLY SCHEME , SM/16255 New New Service connection for Sukur W/S Scheme PH No.-I BILL/01793/2023-2024 BP-2023-24-318 30/12/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 6.06 0.00 0 0
5656 PURBA BARDHAMAN Raina - I Burdwan Division SHUKUR PIPED WATER SUPPLY SCHEME , SM/16255 New Different works related (sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of different capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site) to BAJITPUR, SHUKUR & HARISHNAPUR Piped Water Supply Scheme under RAINA-I Block, District:- Purba Bardhaman [NEW SCHEME] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000388/2023-2024 3197/BWD 24/07/2023 365 MRITYUNJOY MUKHERJEE & CO. 1,242.03 0.00 0 30
5657 PURBA BARDHAMAN Raina - I Central Mechanical SHUKUR PIPED WATER SUPPLY SCHEME , SM/16255 New Continuation order-Hiring of Inspection Vehicle (Diesel/CNG/LPG Driven ) for supervision of site for the office of the Assistant Engineer,under CMD,PHE,Dte. [W.e.f-01/10/2024 to 30/11/2024) [UNDER JJM WORKS] ASSISTANT ENGINEER Junior Engineer ORD/000425/2024-2025 1248/CMSD 30/09/2024 61 PRODYUT GHOSH 0.80 0.77 96.25 0
5658 PURBA BARDHAMAN Raina - I Burdwan Division SHUKUR PIPED WATER SUPPLY SCHEME , SM/16255 New Material Requisition To Resource Division RTOR000084/2024-2025 410/BWD 17/01/2025 Resource Division 6.38 0.00 0 0
5659 PURBA BARDHAMAN Raina - I Central Mechanical SHUKUR PIPED WATER SUPPLY SCHEME , SM/16255 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at Shukur Water Supply Scheme [ Block- Raina-1 ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000724/2023-2024 4035/CMD 29/08/2023 642 S.P. CONSTRUCTION 28.98 0.00 0 95
5660 PURBA BARDHAMAN Raina - I Burdwan Division SHUKUR PIPED WATER SUPPLY SCHEME , SM/16255 New Continuation Work Order for supply of inspection Vehicle No. WB42Y- 7403 for inspection of different JJM related(schemes) works as and when required including supply of driver & fuel(minimum 8 hours duty per day) and all taxes etc. for Burdwan Sub Division under Burdwan Division, PHE Dte consider 96.00 Km. run per day (Period from 01-02-2025 to 30-04-2025) JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/001402/2024-2025 240/BSD 31/01/2025 66 PARVIN BEGAM 0.85 0.00 0 0
5661 PURBA BARDHAMAN Kalna - II Burdwan Division DAFARPUR PIPED WATER SUPPLY SCHEME , SM/16028 New Material Requisition To Resource Division RTOR000075/2023-2024 1962/BWD 25/04/2023 Resource Division 28.10 0.00 0 0
5662 PURBA BARDHAMAN Kalna - II Burdwan Division DAFARPUR PIPED WATER SUPPLY SCHEME , SM/16028 New Material Requisition To Resource Division RTOR000237/2023-2024 2197/BWD 12/05/2023 Resource Division 12.02 0.00 0 0
5663 PURBA BARDHAMAN Kalna - II Central Mechanical DAFARPUR PIPED WATER SUPPLY SCHEME , SM/16028 New Supply & Installation of Submersible Pumping Machinery , Voltage Stabilizer, Chlorination system and internal House wiring for Tube well no.- 1 & 2 at DAFARPUR Water Supply Scheme [Block - KALNA-2] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ORD/000895/2023-2024 4158/CMD 29/08/2023 30 GOENKA ENTERPRISE 20.81 0.00 0 0
5664 PURBA BARDHAMAN Kalna - II Central Mechanical DAFARPUR PIPED WATER SUPPLY SCHEME , SM/16028 New New service at Dafarpur PWSS TW-2. BILL/02292/2023-2024 BP-2023-24-438 29/01/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 4.70 0.00 0 0
5665 PURBA BARDHAMAN Kalna - II Central Mechanical DAFARPUR PIPED WATER SUPPLY SCHEME , SM/16028 New NEW SERVICE CONNECTION FOR DAFARPUR PWSS TW -1. BILL/03103/2023-2024 BP-2023-24-643 15/03/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 20.65 0.00 0 0
5666 PURBA BARDHAMAN Kalna - II Burdwan Division DAFARPUR PIPED WATER SUPPLY SCHEME , SM/16028 New Work Order for "CONSTRUCTION OF TEMPORARY KIOSK FOR THE NECESSARY ARRANGEMENT OF ELECTRIFICATION OF TUBEWELL FOR DAFARPUR PWSS UNDER KALNA SUB-DIVISION UNDER BURDWAN DIVISION, PHE DTE." Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/001148/2023-2024 2104/KSD 04/03/2024 10 ER CONSTRUCTION & GENERAL ORDER SUPPLIER 0.66 0.00 0 2
5667 PURBA BARDHAMAN Kalna - II Central Mechanical DAFARPUR PIPED WATER SUPPLY SCHEME , SM/16028 New Additional quotation for Dafarpur PWSS PH-2 BILL/00426/2024-2025 BP-2024-25-224 26/07/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.51 0.00 0 0
5668 PURBA BARDHAMAN Kalna - II Burdwan Division DAFARPUR PIPED WATER SUPPLY SCHEME , SM/16028 New Work Order for "Hiring of one no. DIESEL MOTOR CAB (BS-VI) (Inspection vehicle) for JJM projects for the Office of the Assistant Engineer, under Kalna Sub-Division within Burdwan Division, P.H.E. Dte. [Period from 01.12.2023 to 31.05.2024]" (Vehicle No-WB 04G 7127) Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000983/2023-2024 1681/KSD 22/11/2023 183 PARTHA PRATIM ACHARYA 0.87 0.15 17.24 51
5669 PURBA BARDHAMAN Kalna - II Burdwan Division DAFARPUR PIPED WATER SUPPLY SCHEME , SM/16028 New Work Order for "Hiring of one no. DIESEL MOTOR CAB (BS-VI) (Inspection vehicle) for JJM projects for the Office of the Assistant Engineer, under Kalna Sub-Division within Burdwan Division, P.H.E. Dte. [Period from 01.12.2023 to 31.05.2024]" (Vehicle No-WB 04G 7127) Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/001248/2023-2024 1681/KSD 22/11/2023 183 PARTHA PRATIM ACHARYA 2.40 0.00 0 0
5670 PURBA BARDHAMAN Kalna - II Burdwan Division DAFARPUR PIPED WATER SUPPLY SCHEME , SM/16028 New Continuation work order for "Hiring of one no. DIESEL MOTOR CAB (BS-VI) (Inspection Vehicle) for JJM projects for the Office of the Assistant Engineer, under Kalna Sub-Division within Burdwan Division, P.H.E. Dte. [Period from 01.06.2024 to 30.11.2024]" (Vehicle No-WB 04G 7127) Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000465/2024-2025 272/KSD 30/05/2024 183 PARTHA PRATIM ACHARYA 2.40 0.30 12.5 0
5671 PURBA BARDHAMAN Kalna - II Burdwan Division DAFARPUR PIPED WATER SUPPLY SCHEME , SM/16028 New Continuation work order for "Hiring of one no. DIESEL MOTOR CAB (BS-VI) (Inspection vehicle) for JJM projects for the Office of the Assistant Engineer, under Kalna Sub-Division within Burdwan Division, P.H.E. Dte. [Period from 01.12.2024 to 28.02.2025] [Vehicle No-WB 04G 7127]". Assistant Engineer ORD/001207/2024-2025 1877/KSD 28/11/2024 90 PARTHA PRATIM ACHARYA 1.20 0.00 0 0
5672 PURBA BARDHAMAN Kalna - II Burdwan Division DAFARPUR PIPED WATER SUPPLY SCHEME , SM/16028 New Pipeline laying by HDD method and different types of balance works in connection with different Augmentation & New Scheme [(SM/ 08103), (SM/13413), (SM/15587), (SM/16035), (SM/16287), (SM/16029), (SM/15581), (SM/14437), (SM/16028), (SM/16036) & (SM/14425)] within Kalna Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer ORD/001270/2024-2025 849/BWD 05/03/2025 180 S.P. CONSTRUCTION 683.30 0.00 0 0
5673 PURBA BARDHAMAN Kalna - II Burdwan Division DAFARPUR PIPED WATER SUPPLY SCHEME , SM/16028 New Different works related (sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of different capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site) to ANGARSON, BHABANANDAPUR &DAFARPUR Piped Water Supply Scheme under Kalna ¿ II Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE,Junior Engineer, R.W.S. Burdwan Sub Division, P.H.E. Dt ORD/000702/2023-2024 4480/BWD 11/10/2023 724 M/S GHOSH & CO. 1,093.29 0.00 0 60
5674 PURBA BARDHAMAN Mangolkote Burdwan Division BANKAPASI PIPE WATER SUPPLY SCHEME , SM/16484 New Material Requisition To Resource Division RTOR000029/2023-2024 1962/BWD 25/04/2023 Resource Division 4.03 0.00 0 0
5675 PURBA BARDHAMAN Mangolkote Burdwan Division BANKAPASI PIPE WATER SUPPLY SCHEME , SM/16484 New Material Requisition To Resource Division RTOR000229/2023-2024 2155/BWD 10/05/2023 Resource Division 11.91 0.00 0 0
5676 PURBA BARDHAMAN Mangolkote Burdwan Division BANKAPASI PIPE WATER SUPPLY SCHEME , SM/16484 New Material Requisition To Resource Division RTOR000559/2023-2024 4892/BWD 10/11/2023 Resource Division 27.17 0.00 0 0
5677 PURBA BARDHAMAN Mangolkote Central Mechanical BANKAPASI PIPE WATER SUPPLY SCHEME , SM/16484 New NEW SERVICE CONNECTION FOR BANKAPASI PWSS. BILL/02862/2023-2024 BP-2023-24-613 06/03/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 7.89 0.00 0 0
5678 PURBA BARDHAMAN Mangolkote Central Mechanical BANKAPASI PIPE WATER SUPPLY SCHEME , SM/16484 New NEW SERVICE CONNECTION FOR BANKAPASI PWSS TW- 2. BILL/02864/2023-2024 BP-2023-24-614 06/03/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 5.23 0.00 0 0
5679 PURBA BARDHAMAN Mangolkote Burdwan Division BANKAPASI PIPE WATER SUPPLY SCHEME , SM/16484 New Continuation Work Order for Supply of 1 (one) No. Inspection Vehicle for different JJM Related Works as and when required including supply of driver and fuels (Minimum 8 Hours of duty) under Katwa Sub-Division within Burdwan Division, P.H.E. Dte. Consider 96.00 Km run per Day Assistant Engineer JUNIOR ENGINEER KATWA SUB-DIVISION PHE DTE ORD/000107/2024-2025 485/KTS 16/04/2024 72 AJIT SAMANTA 0.92 0.00 0 10
5680 PURBA BARDHAMAN Mangolkote Central Mechanical BANKAPASI PIPE WATER SUPPLY SCHEME , SM/16484 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Jabagram & others water supply scheme under Mangalkote Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. Driller In-Charge Junior Engineer ORD/000118/2024-2025 2590/CMD 27/08/2024 90 M/S SAJAHAN CHOWDHURY 62.06 0.00 0 0
5681 PURBA BARDHAMAN Mangolkote Burdwan Division BANKAPASI PIPE WATER SUPPLY SCHEME , SM/16484 New Material Requisition To Resource Division RTOR000033/2024-2025 313/BWD 15/01/2025 Resource Division 4.24 0.00 0 0
5682 PURBA BARDHAMAN Mangolkote Central Mechanical BANKAPASI PIPE WATER SUPPLY SCHEME , SM/16484 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at BANKAPASI Water Supply Scheme [ Block- MANGOLKOTE] under CMD, PHE Dte., Dist.- Purba-Bardhaman. Driller In-Charge Junior Engineer ORD/000877/2023-2024 4140/CMD 29/08/2023 640 CHOUDHURY ENTERPRISE 28.62 0.00 0 43
5683 PURBA BARDHAMAN Mangolkote Burdwan Division BANKAPASI PIPE WATER SUPPLY SCHEME , SM/16484 New BANKAPASI Piped Water Supply Scheme with sinking of Tube-well, LDS, Rising Main, FHTC, Construction of 350 cum capacity RCC OHR with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drain and internal pathway at different TW site under Mongolkote Block, District:- Purba-Bardhaman [NEW SCHEME]_2ND CALL Assistant Engineer JUNIOR ENGINEER KATWA SUB-DIVISION PHE DTE ORD/000501/2023-2024 3534/BWD 10/08/2023 783 DESTINATION SOLUTIONS & SERVICES PRIVATE LIMITED 490.18 8.11 1.65 20
5684 PURBA BARDHAMAN Kalna - II Burdwan Division AKALPAUSH PIPE WATER SUPPLY SCHEME , SM/16485 New Material Requisition To Resource Division RTOR000053/2023-2024 1962/BWD 25/04/2023 Resource Division 34.71 0.00 0 0
5685 PURBA BARDHAMAN Kalna - II Burdwan Division AKALPAUSH PIPE WATER SUPPLY SCHEME , SM/16485 New Material Requisition To Resource Division RTOR000201/2023-2024 2155/BWD 10/05/2023 Resource Division 20.78 0.00 0 0
5686 PURBA BARDHAMAN Kalna - II Central Mechanical AKALPAUSH PIPE WATER SUPPLY SCHEME , SM/16485 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at AKALPAUSH Water Supply Scheme [ Block-KALNA-2 ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. [3rd CALL] ASSISTANT ENGINEER JUNIOR ENGINEER ORD/001055/2023-2024 4190/CMD 29/08/2023 30 AMUSAR IMPEX PVT. LTD. 28.57 0.00 0 0
5687 PURBA BARDHAMAN Kalna - II Burdwan Division AKALPAUSH PIPE WATER SUPPLY SCHEME , SM/16485 New Material Requisition To Resource Division RTOR000609/2023-2024 4914/BWD 10/11/2023 Resource Division 31.31 0.00 0 0
5688 PURBA BARDHAMAN Kalna - II Burdwan Division AKALPAUSH PIPE WATER SUPPLY SCHEME , SM/16485 New Material Requisition To Resource Division RTOR000783/2023-2024 330/BWD 24/01/2024 Resource Division 13.92 0.00 0 0
5689 PURBA BARDHAMAN Kalna - II Central Mechanical AKALPAUSH PIPE WATER SUPPLY SCHEME , SM/16485 New New Service connection at Akalpoush PWSS PH-1 BILL/02321/2023-2024 BP-2023-24-451 30/01/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.42 0.00 0 0
5690 PURBA BARDHAMAN Kalna - II Central Mechanical AKALPAUSH PIPE WATER SUPPLY SCHEME , SM/16485 New New Service connection at Akalpoush PWSS PH-2 BILL/02322/2023-2024 BP-2023-24-452 30/01/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 6.25 0.00 0 0
5691 PURBA BARDHAMAN Kalna - II Burdwan Division AKALPAUSH PIPE WATER SUPPLY SCHEME , SM/16485 New Work Order for "CONSTRUCTION OF TEMPORARY KIOSK FOR THE NECESSARY ARRANGEMENT OF ELECTRIFICATION OF TUBEWELL FOR AKALPOUSH PWSS UNDER KALNA SUB-DIVISION UNDER BURDWAN DIVISION, PHE DTE." Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/001146/2023-2024 2095/KSD 04/03/2024 10 BISWAS ENTERPRISE 0.66 0.00 0 2
5692 PURBA BARDHAMAN Kalna - II Central Mechanical AKALPAUSH PIPE WATER SUPPLY SCHEME , SM/16485 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Khargakur & others water supply scheme under Kalna-2 Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000116/2024-2025 2393/CMD 02/08/2024 280 HANNAN BUILDERS PVT LTD 76.80 0.00 0 20
5693 PURBA BARDHAMAN Kalna - II Burdwan Division AKALPAUSH PIPE WATER SUPPLY SCHEME , SM/16485 New RESTORATION WORK OF KALNA BAIDYAPUR ROAD TO AKALPOUSH HC ROAD FROM 0.00 KM TO 1.50 KM (IN STRETCHES )DAMAGED DUE TO LAYING OF UNDERGROUND WATER PIPELINEBY PHE WITH BOX CUTTING AND JHAMA WITH MOORUM CONSOLIDATION UNDR KALNA HIGHWAY SUB DIVISION OF BURDWAN SOUTH HIGHWAY DIVISION P.W.(ROADS) DTE.. DURING YEAR 2023-2024. BILL/00646/2024-2025 825/JJM 13/09/2024 EXECUTIVE ENGINEER BURDWAN SOUTH HIGHWAY DIVISION P.W. (ROADS) DTE. 1.85 0.00 0 null
5694 PURBA BARDHAMAN Kalna - II Burdwan Division AKALPAUSH PIPE WATER SUPPLY SCHEME , SM/16485 New Different works related (sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of different capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site) to AKALPAUSH & BIRUHA Piped Water Supply Scheme under Kalna ¿ II Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000542/2023-2024 3698/BWD 24/08/2023 365 SUPRITI ENTERPRISE 1,010.87 0.00 0 37
5695 PURBA BARDHAMAN Kalna - II Central Mechanical AKALPAUSH PIPE WATER SUPPLY SCHEME , SM/16485 New Installation of starter in the temporary kiosk & Allied works for urgent FHTC at Akalpaush w/s scheme, T.W. No.-2 under CMD, PHE Dte., Dist.- Purba-Bardhaman. [JJM WORKS] ASSISTANT ENGINEER Junior Engineer ORD/000940/2024-2025 826/CMSD 03/06/2024 7 S.K. ENTERPRISE 0.55 0.00 0 100
5696 PURBA BARDHAMAN Kalna - II Central Mechanical AKALPAUSH PIPE WATER SUPPLY SCHEME , SM/16485 New Installation of starter in the temporary kiosk & Allied works for urgent FHTC at Akalpaush w/s scheme, T.W. No.-1 under CMD, PHE Dte., Dist.- Purba-Bardhaman. [JJM WORKS] ASSISTANT ENGINEER Junior Engineer ORD/000942/2024-2025 825/CMSD 03/06/2024 7 S.K. ENTERPRISE 0.55 0.00 0 100
5697 PURBA BARDHAMAN Central Mechanical AUGMENTATION OF JHAUDANGA (PART-B) PIPED WATER SUPPLY SCHEME , SM/16293 Augmentation Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination system and internal House wiring for Tube well no.- 1 & 2 at Augmentation of JHAUDANGA( Part-B)[ PURBASTHALI-II] Water Supply Scheme under CMD, PHE Dte., Dist.- Purba-Bardhaman. ORD/001084/2023-2024 4475/CMD 05/10/2023 30 ELECTRICAL & MECHANICAL ENGINEERING CORPORATION 24.19 0.00 0 0
5698 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF JHAUDANGA (PART-B) PIPED WATER SUPPLY SCHEME , SM/16293 Augmentation Sinking of 250 X 150mm dia Tube Well 150 mtr. Depth by D.R. Rig method using UPVC pipe (CM) and UPVC Deep Well Screen (RMS) for 1ST TW Site of JHAUDANGA & its adjoining mouzas Piped Water Supply Scheme, Block Purbasthali II, Dist - Purba Bardhaman under Burdwan Division, PHE Dte. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000720/2023-2024 273/BWD 16/01/2024 30 AUXILIARY TUBE WELL DRILLERS 8.64 0.00 0 1
5699 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF JHAUDANGA (PART-B) PIPED WATER SUPPLY SCHEME , SM/16293 Augmentation Construction Pump house and construction (As per drawing no-PHE/SE/CC/PH/DWG-01/ 2022-2023) of new (In same place) Pump House No-2 of JHAUDANGA Water Supply Scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000709/2023-2024 4521/BWD 12/10/2023 60 IYASIN DAFADAR 6.76 0.00 0 15
5700 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF JHAUDANGA (PART-B) PIPED WATER SUPPLY SCHEME , SM/16293 Augmentation Digital structurization of pipeline alignment and asset evaluation including holistic design, preparation of design drawings of overall LDS & preparation of estimate for 09 Nos. Piped W/S. Schemes under Purbasthali II Block under Kalna Sub-Division under Burdwan Division, PHE. Dte. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000338/2024-2025 3018/BWD 05/08/2024 50 HORIZEN 23.70 0.00 0 10
5701 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF JHAUDANGA (PART-B) PIPED WATER SUPPLY SCHEME , SM/16293 Augmentation Different types of works involve in connection with Augmentation of JHAUDANGA (SM/16293), KASHIPUR (SM/16297), PATULI (SM/09718) & PARULIA (SM/09719) Piped water supply scheme under Purbasthali-II Block, Kalna Sub-Division, PHE Dte. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000163/2024-2025 2202/BWD 13/06/2024 360 MONDAL PRECISION PVT LTD 570.00 0.00 0 2
5702 PURBA BARDHAMAN Burdwan Division RETROFITTING OF SONARUDRA PIPED WATER SUPPLY SCHEME , SM/16349 Retrofitting Laying of 140 mm dia HDPE Pipeline from Sonarudra Head Work Site more to upto Shyambati & Baidyapur more (Sec 34-2-3-6-10-12-14-16-16A-16B) of SONARUDRA W/S Scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000601/2021-2022 1486/BWD 14/03/2022 30 HAMID SK 18.85 5.23 27.75 100
5703 PURBA BARDHAMAN Burdwan Division RETROFITTING OF SONARUDRA PIPED WATER SUPPLY SCHEME , SM/16349 Retrofitting Sinking of additional Tube Well, construction of pump house & boundary wall & laying interconnection of SONARUDRA Piped water supply scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. (PP Site- Shyambati Baidyapur). Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000864/2023-2024 5295/BWD 01/12/2023 60 HI-LIGHT ELECTRONICS 27.37 0.00 0 60
5704 PURBA BARDHAMAN Burdwan Division RETROFITTING OF SONARUDRA PIPED WATER SUPPLY SCHEME , SM/16349 Retrofitting Augmentation of SONARUDRA PWSS to accommodate FHTC, Laying Distribution System, Laying Rising Main, under Jal Jivan Mission of Purbasthali - I Block, Purba Burdwan District under Burdwan Division, PHE. Dte. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000152/2023-2024 2442/BWD 30/05/2023 60 ROHAN MONDAL 43.32 30.83 71.17 20
5705 PURBA BARDHAMAN Burdwan Division RETROFITTING OF SONARUDRA PIPED WATER SUPPLY SCHEME , SM/16349 Retrofitting Digital structurization of pipeline alignment and asset evaluation including holistic design, preparation of design drawings of overall LDS & preparation of estimate for 14 Nos. Piped W/S. Schemes under Purbasthali I Block under Kalna Sub-Division under Burdwan Division, PHE. Dte. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000337/2024-2025 3017/BWD 05/08/2024 75 HORIZEN 38.00 0.00 0 100
5706 PURBA BARDHAMAN Burdwan Division RETROFITTING OF SONARUDRA PIPED WATER SUPPLY SCHEME , SM/16349 Retrofitting Different Types of work involved in connection with Augmentation of SONARUDRA (SM/16349) & KACHUA (SM/13497) Piped Water Supply Scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000192/2024-2025 2430/BWD 27/06/2024 480 R.G. INFRASTRUCTURE 240.70 0.00 0 2
5707 PURBA BARDHAMAN Kalna - II Burdwan Division KUSDANGA PIPED WATER SUPPLY SCHEME , SM/16036 New Material Requisition To Resource Division RTOR000084/2023-2024 1962/BWD 25/04/2023 Resource Division 22.36 0.00 0 0
5708 PURBA BARDHAMAN Kalna - II Burdwan Division KUSDANGA PIPED WATER SUPPLY SCHEME , SM/16036 New Material Requisition To Resource Division RTOR000392/2023-2024 2197/BWD 12/05/2023 Resource Division 10.79 0.00 0 0
5709 PURBA BARDHAMAN Kalna - II Burdwan Division KUSDANGA PIPED WATER SUPPLY SCHEME , SM/16036 New Material Requisition To Resource Division RTOR000632/2023-2024 4874/BWD 10/11/2023 Resource Division 28.85 0.00 0 0
5710 PURBA BARDHAMAN Kalna - II Central Mechanical KUSDANGA PIPED WATER SUPPLY SCHEME , SM/16036 New New Service connection for Kushodanga W/S Scheme. BILL/02278/2023-2024 BP-2023-24-437 29/01/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 5.25 0.00 0 0
5711 PURBA BARDHAMAN Kalna - II Central Mechanical KUSDANGA PIPED WATER SUPPLY SCHEME , SM/16036 New NEW SERVICE CONNECTION FOR KUSDANGA PWSS TW -2. BILL/03107/2023-2024 BP-2023-24-647 15/03/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 4.03 0.00 0 0
5712 PURBA BARDHAMAN Kalna - II Burdwan Division KUSDANGA PIPED WATER SUPPLY SCHEME , SM/16036 New KUSDANGA PWSS Piped Water Supply Scheme with sinking of Tube-well, LDS, Rising Main, FHTC, Construction of 100 cum capacity RCC OHR with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drain and internal pathway at different TW site under Kalna-II Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000706/2023-2024 4523/BWD 12/10/2023 365 SYED KHORSED ALAM 258.80 0.00 0 25
5713 PURBA BARDHAMAN Kalna - II Central Mechanical KUSDANGA PIPED WATER SUPPLY SCHEME , SM/16036 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System, Internal House Wiring and Compound lighting arrangement for Tube well No.- 1 & 2 at KUSDANGA Water Supply Scheme [BLOCK- KALNA-2] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/001607/2023-2024 1536/CMD 05/03/2024 60 MITRA ENTERPRISE 28.81 0.00 0 50
5714 PURBA BARDHAMAN Kalna - II Burdwan Division KUSDANGA PIPED WATER SUPPLY SCHEME , SM/16036 New Restoration of Masonary drain due laying of 90 mm. dia. HDPE pipe along with increasing height of boundary wall and other ancillary work under the command area of Kusdanga PWSS (SM/16036) under Kalna Sub Division under Burdwan Divn., PHE. Dte. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000885/2024-2025 4240/BWD 03/12/2024 21 RUBAL CONSTRUCTION 13.62 0.00 0 0
5715 PURBA BARDHAMAN Kalna - II Burdwan Division KUSDANGA PIPED WATER SUPPLY SCHEME , SM/16036 New Road Restoration work under the command area of Kusdanga PWSS (SM/16036) under Kalna Sub Division under Burdwan Division, PHE. Dte. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000886/2024-2025 4170/BWD 29/11/2024 21 RUBAL CONSTRUCTION 15.12 0.00 0 0
5716 PURBA BARDHAMAN Kalna - II Burdwan Division KUSDANGA PIPED WATER SUPPLY SCHEME , SM/16036 New Pipeline laying by HDD method and different types of balance works in connection with different Augmentation & New Scheme [(SM/ 08103), (SM/13413), (SM/15587), (SM/16035), (SM/16287), (SM/16029), (SM/15581), (SM/14437), (SM/16028), (SM/16036) & (SM/14425)] within Kalna Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer ORD/001270/2024-2025 849/BWD 05/03/2025 180 S.P. CONSTRUCTION 683.30 0.00 0 0
5717 PURBA BARDHAMAN Burdwan - II Burdwan Division Balgana Piped Water Supply Scheme , SM/18326 New Material Requisition To Resource Division RTOR000224/2023-2024 2155/BWD 10/05/2023 Resource Division 3.74 0.00 0 0
5718 PURBA BARDHAMAN Burdwan - II Burdwan Division Balgana Piped Water Supply Scheme , SM/18326 New Material Requisition To Resource Division RTOR000402/2023-2024 3830/BWD 01/09/2023 Resource Division 19.80 0.00 0 0
5719 PURBA BARDHAMAN Burdwan - II Burdwan Division Balgana Piped Water Supply Scheme , SM/18326 New Material Requisition To Resource Division RTOR000648/2023-2024 5111/BWD 23/11/2023 Resource Division 20.46 0.00 0 0
5720 PURBA BARDHAMAN Burdwan - II Central Mechanical Balgana Piped Water Supply Scheme , SM/18326 New New service connection charges for Balgona PWSS TW-1 BILL/01829/2023-2024 BP-2023-24-339 06/01/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 6.44 0.00 0 0
5721 PURBA BARDHAMAN Burdwan - II Central Mechanical Balgana Piped Water Supply Scheme , SM/18326 New New service connection charges for Balgana PWSS TW-2 BILL/02206/2023-2024 BP-2023-24-403 17/01/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 4.86 0.00 0 0
5722 PURBA BARDHAMAN Burdwan - II Central Mechanical Balgana Piped Water Supply Scheme , SM/18326 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at KUSHA & others water supply scheme under Bardhaman-II Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman ASSISTANT ENGINEER Junior Engineer ORD/000065/2024-2025 2389/CMD 02/08/2024 90 DILIP MAHATO 53.14 0.00 0 0
5723 PURBA BARDHAMAN Burdwan - II Central Mechanical Balgana Piped Water Supply Scheme , SM/18326 New Quotation for new service connection at Augmentation of Balgona PWSS PH-4 BILL/00391/2024-2025 BP-2024-25-208 18/07/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 4.22 0.00 0 0
5724 PURBA BARDHAMAN Burdwan - II Central Mechanical Balgana Piped Water Supply Scheme , SM/18326 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Replacement T.W of Bolgona Water Supply Scheme(H.W site) [ BLOCK- Bhatar] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000529/2024-2025 3069/CMD 03/12/2024 60 CHOUDHURY ENTERPRISE 18.41 0.00 0 0
5725 PURBA BARDHAMAN Burdwan - II Burdwan Division Balgana Piped Water Supply Scheme , SM/18326 New Material Requisition To Resource Division RTOR000024/2024-2025 335/BWD 15/01/2025 Resource Division 12.06 0.00 0 0
5726 PURBA BARDHAMAN Burdwan - II Central Mechanical Balgana Piped Water Supply Scheme , SM/18326 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at Balgana Water Supply Scheme [ Block- Burdwan-2 ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER Junior Engineer ORD/000669/2023-2024 4007/CMD 29/08/2023 581 GLACIER ENGINEERING CO 28.96 0.00 0 95
5727 PURBA BARDHAMAN Burdwan - II Burdwan Division Balgana Piped Water Supply Scheme , SM/18326 New Different works related (sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of different capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site) to BALGANA & GANGPUR Piped Water Supply Scheme under Burdwan ¿ II Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. Junior Engineer, Burdwan Sadar Sub-Division ORD/000538/2023-2024 3699/BWD 24/08/2023 769 SUPRITI ENTERPRISE 1,345.79 0.00 0 20
5728 PURBA BARDHAMAN Burdwan - II Burdwan Division Balgana Piped Water Supply Scheme , SM/18326 New Different Types of work involved in connection with different Augmentation & New Schemes (11 Nos.) Piped Water Supply Scheme under Burdwan II Block within Burdwan Sub-Div., under Burdwan Division PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/001349/2024-2025 1060/BWD 25/03/2025 120 R.G. INFRASTRUCTURE 262.23 0.00 0 0
5729 PURBA BARDHAMAN Raina - I Burdwan Division BANTIR PIPED WATER SUPPLY SCHEME , SM/18300 New Material Requisition To Resource Division RTOR000230/2023-2024 2155/BWD 10/05/2023 Resource Division 16.06 0.00 0 0
5730 PURBA BARDHAMAN Raina - I Burdwan Division BANTIR PIPED WATER SUPPLY SCHEME , SM/18300 New Material Requisition To Resource Division RTOR000420/2023-2024 3862/BWD 01/09/2023 Resource Division 3.19 0.00 0 0
5731 PURBA BARDHAMAN Raina - I Burdwan Division BANTIR PIPED WATER SUPPLY SCHEME , SM/18300 New Material Requisition To Resource Division RTOR000652/2023-2024 5098/BWD 23/11/2023 Resource Division 20.46 0.00 0 0
5732 PURBA BARDHAMAN Raina - I Central Mechanical BANTIR PIPED WATER SUPPLY SCHEME , SM/18300 New New electric connection for Bantir PWSS, PH-1. BILL/01873/2023-2024 BP-2023-24-359 11/01/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.18 0.00 0 0
5733 PURBA BARDHAMAN Raina - I Central Mechanical BANTIR PIPED WATER SUPPLY SCHEME , SM/18300 New New service connection charges for Bantir PWSS TW-2 BILL/02198/2023-2024 BP-2023-24-402 17/01/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 7.33 0.00 0 0
5734 PURBA BARDHAMAN Raina - I Central Mechanical BANTIR PIPED WATER SUPPLY SCHEME , SM/18300 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Bajitpur, Belsar & other water supply scheme under Raina-1 Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000117/2024-2025 2589/CMD 27/08/2024 90 DEY ENTERPRISE 74.58 0.00 0 0
5735 PURBA BARDHAMAN Raina - I Central Mechanical BANTIR PIPED WATER SUPPLY SCHEME , SM/18300 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at Bantir Water Supply Scheme [ Block- Raina-1 ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000718/2023-2024 4029/CMD 29/08/2023 520 M.S. ENTERPRISE 28.98 0.00 0 96
5736 PURBA BARDHAMAN Raina - I Burdwan Division BANTIR PIPED WATER SUPPLY SCHEME , SM/18300 New BANTIR Piped Water Supply Scheme with sinking of Tube-well, LDS, Rising Main, FHTC, Construction of 400 cum capacity RCC OHR with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drain and internal pathway at different TW site under Raina-I Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000410/2023-2024 3255/BWD 27/07/2023 524 SK ALIM 797.64 200.05 25.08 76
5737 PURBA BARDHAMAN Raina - I Burdwan Division BANTIR PIPED WATER SUPPLY SCHEME , SM/18300 New Material Requisition To Resource Division RTOR000027/2024-2025 306/BWD 15/01/2025 Resource Division 1.04 0.00 0 0
5738 PURBA BARDHAMAN Raina - I Burdwan Division BANTIR PIPED WATER SUPPLY SCHEME , SM/18300 New Continuation Work Order for supply of inspection Vehicle for inspection of different JJM related (schemes)works as and when required including supply of driver & fuel(minimum 8 hours duty per day) and all taxes etc. for Burdwan Sub-Division under Burdwan Division,PHE Dte consider 96.00 Km. run per day (Period from 01-08-2024 to 31-10-2024) JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000557/2024-2025 1500/BSD 30/07/2024 66 PARVIN BEGAM 0.85 0.28 32.94 100
5739 PURBA BARDHAMAN Raina - I Burdwan Division BANTIR PIPED WATER SUPPLY SCHEME , SM/18300 New Balance work [i.e. Extension or parallel Pipeline, Leftout FHTC, Road Restoration work, Sinking of Additional Tube Well with Pump House & Boundary wall, inter Connection of Additional Tube Well, Construction of M.S.Structural bridge, canal Crossing, MS casing with allied work of Bhagabatipur, Machkhara, Udgara, Bantir, Chakpurohit Rasuikhanda, Sankarpur, Gopalpur & Belshar PWSS Block-RAINA- I under Burdwan Sub Division, PHE Dte. within Burdwan Division PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/001103/2024-2025 469/BWD 24/01/2025 180 SK ALIM 1,353.91 0.00 0 0
5740 PURBA BARDHAMAN Raina - I Central Mechanical BANTIR PIPED WATER SUPPLY SCHEME , SM/18300 New Supply & delivery of starter, cable & other electro-mechanical equipment for the installation of pumping machinery in kiosk to facilitate urgent FHTC work at Bantir w/s scheme, T/W no.-I [Raina-I block] under CMD, PHE Dte., Dist.- Purba-Bardhaman. [JJM WORKS]. ASSISTANT ENGINEER Junior Engineer ORD/000938/2024-2025 580/CMSD 05/04/2024 7 M.S. ENTERPRISE 0.38 0.00 0 100
5741 PURBA BARDHAMAN Raina - I Burdwan Division BANTIR PIPED WATER SUPPLY SCHEME , SM/18300 New Supply of various D.I. Mechanical joints & specials for KATNABIL & BANTIR Piped W/S. Scheme within Burdwan Sub-Division under Burdwan Division, PHE. Dte. [Part-B]. AE(HQs) JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000302/2024-2025 2825/BWD 19/07/2024 216 KEJRIWAL CASTINGS LIMITED 4.82 0.00 0 100
5742 PURBA BARDHAMAN Raina - I Burdwan Division BANTIR PIPED WATER SUPPLY SCHEME , SM/18300 New Supply of various D.I. Mechanical joints & specials for KATNABIL & BANTIR Piped W/S. Scheme within Burdwan Sub-Division under Burdwan Division, PHE. Dte. [Part-A]. AE(HQs) JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000313/2024-2025 2837/BWD 19/07/2024 215 ELECTROSTEEL CASTING LIMITED 4.95 0.00 0 100
5743 PURBA BARDHAMAN Raina - I Burdwan Division BANTIR PIPED WATER SUPPLY SCHEME , SM/18300 New Supply of various D.I. Mechanical joints & specials for KATNABIL & BANTIR Piped W/S. Scheme within Burdwan Sub-Division under Burdwan Division, PHE. Dte. [Part-C]. AE(HQs) JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000306/2024-2025 2829/BWD 19/07/2024 225 JINDAL SAW LTD. 4.63 0.00 0 100
5744 PURBA BARDHAMAN Raina - I Burdwan Division BHAGABATIPUR PIPED WATER SUPPLY SCHEME , SM/14977 New Material Requisition To Resource Division RTOR000205/2023-2024 2155/BWD 10/05/2023 Resource Division 5.77 0.00 0 0
5745 PURBA BARDHAMAN Raina - I Burdwan Division BHAGABATIPUR PIPED WATER SUPPLY SCHEME , SM/14977 New Material Requisition To Resource Division RTOR000534/2023-2024 4286/BWD 29/09/2023 Resource Division 1.53 0.00 0 0
5746 PURBA BARDHAMAN Raina - I Burdwan Division BHAGABATIPUR PIPED WATER SUPPLY SCHEME , SM/14977 New Material Requisition To Resource Division RTOR000656/2023-2024 5101/BWD 23/11/2023 Resource Division 20.46 0.00 0 0
5747 PURBA BARDHAMAN Raina - I Central Mechanical BHAGABATIPUR PIPED WATER SUPPLY SCHEME , SM/14977 New New Service connection for BHAGABATIPUR W/S Scheme PH No.-1 BILL/01795/2023-2024 BP-2023-24-312 30/12/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 7.93 0.00 0 0
5748 PURBA BARDHAMAN Raina - I Central Mechanical BHAGABATIPUR PIPED WATER SUPPLY SCHEME , SM/14977 New New electric connection for Bhagabatipur PWSS, PH-1 BILL/01886/2023-2024 BP-2023-24-343 11/01/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.15 0.00 0 0
5749 PURBA BARDHAMAN Raina - I Central Mechanical BHAGABATIPUR PIPED WATER SUPPLY SCHEME , SM/14977 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Bajitpur, Belsar & other water supply scheme under Raina-1 Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000117/2024-2025 2589/CMD 27/08/2024 90 DEY ENTERPRISE 74.58 0.00 0 0
5750 PURBA BARDHAMAN Raina - I Burdwan Division BHAGABATIPUR PIPED WATER SUPPLY SCHEME , SM/14977 New Continuation Work Order for supply of inspection Vehicle for inspection of different JJM related(schemes)works as and when required including supply of driver & fuel(minimum 8 hours duty per day) and all taxes etc. for Burdwan Sub-Division under Burdwan Division,PHE Dte consider 96.00 Km. run per day (Period from 01-05-2024 to 31-07-2024) JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000108/2024-2025 807/BSD 29/04/2024 66 PARVIN BEGAM 0.85 0.00 0 100
5751 PURBA BARDHAMAN Raina - I Burdwan Division BHAGABATIPUR PIPED WATER SUPPLY SCHEME , SM/14977 New Different works related (sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of different capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site) to BHAGABATIPUR, MACHKHARA & UDGARA Piped Water Supply Scheme under Raina ¿ I Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000690/2023-2024 4386/BWD 05/10/2023 365 SK ALIM 1,378.97 0.00 0 55
5752 PURBA BARDHAMAN Raina - I Burdwan Division BHAGABATIPUR PIPED WATER SUPPLY SCHEME , SM/14977 New Material Requisition To Resource Division RTOR000032/2024-2025 312/BWD 15/01/2025 Resource Division 4.76 0.00 0 0
5753 PURBA BARDHAMAN Raina - I Burdwan Division BHAGABATIPUR PIPED WATER SUPPLY SCHEME , SM/14977 New Balance work [i.e. Extension or parallel Pipeline, Leftout FHTC, Road Restoration work, Sinking of Additional Tube Well with Pump House & Boundary wall, inter Connection of Additional Tube Well, Construction of M.S.Structural bridge, canal Crossing, MS casing with allied work of Bhagabatipur, Machkhara, Udgara, Bantir, Chakpurohit Rasuikhanda, Sankarpur, Gopalpur & Belshar PWSS Block-RAINA- I under Burdwan Sub Division, PHE Dte. within Burdwan Division PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/001103/2024-2025 469/BWD 24/01/2025 180 SK ALIM 1,353.91 0.00 0 0
5754 PURBA BARDHAMAN Raina - I Central Mechanical BHAGABATIPUR PIPED WATER SUPPLY SCHEME , SM/14977 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at Bhagabatipur Water Supply Scheme [ Block- Raina-1 ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000908/2023-2024 4172/CMD 29/08/2023 595 SOUNAK ENTERPRISE 29.71 0.00 0 90
5755 PURBA BARDHAMAN Memari - II Burdwan Division BIJUR PIPED WATER SUPPLY SCHEME , SM/18605 New Material Requisition To Resource Division RTOR000261/2023-2024 2197/BWD 12/05/2023 Resource Division 3.36 0.00 0 0
5756 PURBA BARDHAMAN Memari - II Burdwan Division BIJUR PIPED WATER SUPPLY SCHEME , SM/18605 New Material Requisition To Resource Division RTOR000658/2023-2024 5116/BWD 23/11/2023 Resource Division 20.46 0.00 0 0
5757 PURBA BARDHAMAN Memari - II Central Mechanical BIJUR PIPED WATER SUPPLY SCHEME , SM/18605 New New service connection at Bijur PWSS PH-2 BILL/02353/2023-2024 BP-2023-24-470 31/01/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 5.63 0.00 0 0
5758 PURBA BARDHAMAN Memari - II Central Mechanical BIJUR PIPED WATER SUPPLY SCHEME , SM/18605 New New service connection at Bijur PWSS PH-1 BILL/02355/2023-2024 BP-2023-24-469 31/01/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 2.66 0.00 0 0
5759 PURBA BARDHAMAN Memari - II Central Mechanical BIJUR PIPED WATER SUPPLY SCHEME , SM/18605 New New service connection for BIJUR PWSS TW 1. BILL/02440/2023-2024 BP-2023-24-527 09/02/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 0.70 0.00 0 0
5760 PURBA BARDHAMAN Memari - II Central Mechanical BIJUR PIPED WATER SUPPLY SCHEME , SM/18605 New New service connection for BIJUR PWSS TW 2. BILL/02441/2023-2024 BP-2023-24-526 09/02/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 1.86 0.00 0 0
5761 PURBA BARDHAMAN Memari - II Central Mechanical BIJUR PIPED WATER SUPPLY SCHEME , SM/18605 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at NOAHATI & others water supply scheme under Memari-II Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. ASSISTANT ENGINEER Junior Engineer ORD/000102/2024-2025 2395/CMD 02/08/2024 90 S.G. TECHNICAL SERVICES 36.99 0.00 0 0
5762 PURBA BARDHAMAN Memari - II Central Mechanical BIJUR PIPED WATER SUPPLY SCHEME , SM/18605 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at Bijur Water Supply Scheme [ Block- Memari-2 ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER Junior Engineer ORD/000713/2023-2024 4024/CMD 29/08/2023 30 MS DAS ELECTRIC CO 29.40 0.00 0 95
5763 PURBA BARDHAMAN Memari - II Burdwan Division BIJUR PIPED WATER SUPPLY SCHEME , SM/18605 New Different works related (sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of different capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site) to BIJUR & REAN Piped Water Supply Scheme under Memari ¿ II Block, District:- Purba-Bardhaman [NEW SCHEME]_2ND CALL Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000481/2023-2024 3495/BWD 09/08/2023 365 NATIONAL CONSTRUCTION 1,175.31 58.07 4.94 65
5764 PURBA BARDHAMAN Memari - II Burdwan Division BIJUR PIPED WATER SUPPLY SCHEME , SM/18605 New Material Requisition To Resource Division RTOR000028/2024-2025 307/BWD 15/01/2025 Resource Division 12.70 0.00 0 0
5765 PURBA BARDHAMAN Memari - II Burdwan Division BIJUR PIPED WATER SUPPLY SCHEME , SM/18605 New Different Types of work involved in connection with different New Schemes (05 Nos.) Piped Water Supply Scheme under Memari II Block within Burdwan Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000003/2025-2026 1116/BWD 03/04/2025 120 SOFIQUL ISLAM 176.89 0.00 0 0
5766 PURBA BARDHAMAN Memari - II Burdwan Division BIJUR PIPED WATER SUPPLY SCHEME , SM/18605 New SHIFTING OF 11KV LINE OVER BIJUR PWSS PREMISES BILL/00081/2025-2026 null 24/04/2025 WBSEDCL 2.71 0.00 0 null
5767 PURBA BARDHAMAN Memari - II Burdwan Division BISHNUPUR PIPED WATER SUPPLY SCHEME , SM/18608 New Material Requisition To Resource Division RTOR000264/2023-2024 2197/BWD 12/05/2023 Resource Division 4.44 0.00 0 0
5768 PURBA BARDHAMAN Memari - II Burdwan Division BISHNUPUR PIPED WATER SUPPLY SCHEME , SM/18608 New Material Requisition To Resource Division RTOR000429/2023-2024 3857/BWD 01/09/2023 Resource Division 4.47 0.00 0 0
5769 PURBA BARDHAMAN Memari - II Burdwan Division BISHNUPUR PIPED WATER SUPPLY SCHEME , SM/18608 New Material Requisition To Resource Division RTOR000570/2023-2024 4942/BWD 10/11/2023 Resource Division 41.11 0.00 0 0
5770 PURBA BARDHAMAN Memari - II Central Mechanical BISHNUPUR PIPED WATER SUPPLY SCHEME , SM/18608 New New electric connection for Bishnupur PWSS, PH-3. BILL/01878/2023-2024 BP-2023-24-362 11/01/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 4.87 0.00 0 0
5771 PURBA BARDHAMAN Memari - II Central Mechanical BISHNUPUR PIPED WATER SUPPLY SCHEME , SM/18608 New New service connection charges for Bishnupur PWSS TW-2 BILL/02211/2023-2024 BP-2023-24-404 17/01/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 0.36 0.00 0 0
5772 PURBA BARDHAMAN Memari - II Central Mechanical BISHNUPUR PIPED WATER SUPPLY SCHEME , SM/18608 New New electric connection for Bishnupur PWSS, PH-1. BILL/01877/2023-2024 BP-2023-24-361 11/01/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 15.08 0.00 0 0
5773 PURBA BARDHAMAN Memari - II Central Mechanical BISHNUPUR PIPED WATER SUPPLY SCHEME , SM/18608 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at NOAHATI & others water supply scheme under Memari-II Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. ASSISTANT ENGINEER Junior Engineer ORD/000102/2024-2025 2395/CMD 02/08/2024 90 S.G. TECHNICAL SERVICES 36.99 0.00 0 0
5774 PURBA BARDHAMAN Memari - II Burdwan Division BISHNUPUR PIPED WATER SUPPLY SCHEME , SM/18608 New Continuation Work Order for supply of inspection Vehicle for inspection of different JJM related(schemes)works as and when required including supply of driver & fuel(minimum 8 hours duty per day) and all taxes etc. for Burdwan Sub-Division under Burdwan Division,PHE Dte consider 96.00 Km. run per day (Period from 01-05-2024 to 31-07-2024) JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000108/2024-2025 807/BSD 29/04/2024 66 PARVIN BEGAM 0.85 0.00 0 100
5775 PURBA BARDHAMAN Memari - II Burdwan Division BISHNUPUR PIPED WATER SUPPLY SCHEME , SM/18608 New Material Requisition To Resource Division RTOR000008/2024-2025 4117/BWD 25/11/2024 Resource Division 18.97 0.00 0 0
5776 PURBA BARDHAMAN Memari - II Central Mechanical BISHNUPUR PIPED WATER SUPPLY SCHEME , SM/18608 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1, 2 & 3 at BISHNUPUR Water Supply Scheme [ Block- MEMARI-2 ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER Junior Engineer ORD/000791/2023-2024 4079/CMD 29/08/2023 30 C.M. ENTERPRISE 44.08 0.00 0 95
5777 PURBA BARDHAMAN Memari - II Burdwan Division BISHNUPUR PIPED WATER SUPPLY SCHEME , SM/18608 New Field level data validation of FHTC executed by Agencies on the basis of pictorial data with the objective of controlling multiple entry,improving data quality in terms of absolute household by verification through electric connection or any other unique documents and making error free database of BISHNUPUR Pipe Water Supply Scheme in Memari-II Block within Burdwan Sub-Division under Burdwan Division,PHE Dte. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000887/2024-2025 2670/BSD 04/12/2024 30 TECHVISION 1.52 0.00 0 0
5778 PURBA BARDHAMAN Memari - II Burdwan Division BISHNUPUR PIPED WATER SUPPLY SCHEME , SM/18608 New BISHNUPUR Piped Water Supply Scheme with sinking of Tube-well, LDS, Rising Main, FHTC, Construction of 500 cum capacity RCC OHR with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drain and internal pathway at different TW site under Memari-II Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000451/2023-2024 3426/BWD 07/08/2023 608 NATIONAL CONSTRUCTION 870.64 304.36 34.96 70
5779 PURBA BARDHAMAN Memari - II Burdwan Division BISHNUPUR PIPED WATER SUPPLY SCHEME , SM/18608 New Different Types of work involved in connection with different New Schemes (05 Nos.) Piped Water Supply Scheme under Memari II Block within Burdwan Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000003/2025-2026 1116/BWD 03/04/2025 120 SOFIQUL ISLAM 176.89 0.00 0 0
5780 PURBA BARDHAMAN Memari - II Central Mechanical BISHNUPUR PIPED WATER SUPPLY SCHEME , SM/18608 New Supply & fitting fixing of pressure gauge & additional submersible cable at Bishnupur, Ukhrid& others water supply scheme under CMD, P.H.E. Dte., Dist.- PurbaBardhaman ASSISTANT ENGINEER Junior Engineer ORD/000971/2024-2025 1252/CMSD 30/09/2024 15 C.M. ENTERPRISE 0.70 0.00 0 100
5781 PURBA BARDHAMAN Memari - I Burdwan Division SANUI PIPED WATER SUPPLY SCHEME , SM/18610 New Material Requisition To Resource Division RTOR000284/2023-2024 2197/BWD 12/05/2023 Resource Division 8.15 0.00 0 0
5782 PURBA BARDHAMAN Memari - I Burdwan Division SANUI PIPED WATER SUPPLY SCHEME , SM/18610 New Material Requisition To Resource Division RTOR000434/2023-2024 3852/BWD 01/09/2023 Resource Division 13.05 0.00 0 0
5783 PURBA BARDHAMAN Memari - I Burdwan Division SANUI PIPED WATER SUPPLY SCHEME , SM/18610 New Material Requisition To Resource Division RTOR000573/2023-2024 4943/BWD 10/11/2023 Resource Division 41.11 0.00 0 0
5784 PURBA BARDHAMAN Memari - I Central Mechanical SANUI PIPED WATER SUPPLY SCHEME , SM/18610 New New service connection for Sanui W/S Scheme. BILL/02186/2023-2024 BP-2023-24-380 16/01/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 15.93 0.00 0 0
5785 PURBA BARDHAMAN Memari - I Central Mechanical SANUI PIPED WATER SUPPLY SCHEME , SM/18610 New New service connection for Sanui W/S Scheme. BILL/02185/2023-2024 BP-2023-24-381 16/01/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 5.95 0.00 0 0
5786 PURBA BARDHAMAN Memari - I Central Mechanical SANUI PIPED WATER SUPPLY SCHEME , SM/18610 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at SAHAPUR & others water supply scheme under Memari-I Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. ASSISTANT ENGINEER Junior Engineer ORD/000100/2024-2025 2392/CMD 02/08/2024 90 MITRA ENTERPRISE 47.62 0.00 0 0
5787 PURBA BARDHAMAN Memari - I Burdwan Division SANUI PIPED WATER SUPPLY SCHEME , SM/18610 New Continuation work order for "Supply of one No. Diesel Driven Ambassador Car on hire basis for the office of the Assistant Engineer, Burdwan Sub-Division, PHE Dte. (Period from 01-06-2024 to 31-08-2024" JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000228/2024-2025 918/BSD 28/05/2024 92 SK. ASFIA 1.20 0.00 0 60
5788 PURBA BARDHAMAN Memari - I Burdwan Division SANUI PIPED WATER SUPPLY SCHEME , SM/18610 New Material Requisition To Resource Division RTOR000017/2024-2025 4107/BWD 25/11/2024 Resource Division 15.04 0.00 0 0
5789 PURBA BARDHAMAN Memari - I Burdwan Division SANUI PIPED WATER SUPPLY SCHEME , SM/18610 New SANUI Piped Water Supply Scheme with sinking of Tube-well, LDS, Rising Main, FHTC, Construction of 500 cum capacity RCC OHR with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drain and internal pathway at different TW site under Memari-I Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000503/2023-2024 3536/BWD 10/08/2023 510 M/S ASHA CONSTRUCTION 825.12 0.00 0 35
5790 PURBA BARDHAMAN Memari - I Central Mechanical SANUI PIPED WATER SUPPLY SCHEME , SM/18610 New Quotation for new service connection at Sanui PWSS TW 3. BILL/01239/2024-2025 BP-2024-25-422 09/01/2025 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 11.44 0.00 0 0
5791 PURBA BARDHAMAN Memari - I Burdwan Division SANUI PIPED WATER SUPPLY SCHEME , SM/18610 New Restoration of Conc. road, Providing leftout FHTC with extension of Pipeline, construction of Pathway, drain, repairing of Pump House at Head Work site with allied works for MAGRA, SANUI, SATGACHIA Zone-I & NARAGOHALIA PIPED WATER SUPPLY SCHEME, Block-Memari-I, within Burdwan Sub Division under Burdwan Division PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/001192/2024-2025 611/BWD 11/02/2025 180 M/S ASHA CONSTRUCTION 354.13 0.00 0 0
5792 PURBA BARDHAMAN Memari - I Central Mechanical SANUI PIPED WATER SUPPLY SCHEME , SM/18610 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1, 2 & 3 at SANUI Water Supply Scheme [ Block- MEMARI-1 ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER Junior Engineer ORD/000785/2023-2024 4077/CMD 29/08/2023 672 JAL PRAVAHIKA PVT LTD 44.08 0.00 0 70
5793 PURBA BARDHAMAN Mangolkote Burdwan Division HALIMPUR PIPE WATER SUPPLY SCHEME , SM/18343 New Material Requisition To Resource Division RTOR000274/2023-2024 2197/BWD 12/05/2023 Resource Division 16.69 0.00 0 0
5794 PURBA BARDHAMAN Mangolkote Burdwan Division HALIMPUR PIPE WATER SUPPLY SCHEME , SM/18343 New Material Requisition To Resource Division RTOR000408/2023-2024 3872/BWD 01/09/2023 Resource Division 1.27 0.00 0 0
5795 PURBA BARDHAMAN Mangolkote Central Mechanical HALIMPUR PIPE WATER SUPPLY SCHEME , SM/18343 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1, 2 & 3 at HALIMPUR Water Supply Scheme [ Block- MANGOLKOTE ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. Driller In-Charge Junior Engineer ORD/000871/2023-2024 4134/CMD 29/08/2023 30 P.K. ENGINEERING 45.29 0.00 0 0
5796 PURBA BARDHAMAN Mangolkote Burdwan Division HALIMPUR PIPE WATER SUPPLY SCHEME , SM/18343 New Material Requisition To Resource Division RTOR000571/2023-2024 4921/BWD 10/11/2023 Resource Division 27.49 0.00 0 0
5797 PURBA BARDHAMAN Mangolkote Central Drilling HALIMPUR PIPE WATER SUPPLY SCHEME , SM/18343 New Providing drilling crew and other allied works for construction of Tube Well (250mm X150mm X 240 Mtrs. Depth) by utilizing Departmental Machineries for Halimpur W/S Scheme (T/W-I & II), Block- Mangolkote under Purba Bardhman District, Central Drilling Division, P.H.E. Dte. Assistant Engineer Junior Engineer ORD/000153/2023-2024 1340/CDD 13/09/2023 354 M/S SAIKAT ENTERPRISE 23.35 0.00 0 50
5798 PURBA BARDHAMAN Mangolkote Burdwan Division HALIMPUR PIPE WATER SUPPLY SCHEME , SM/18343 New Continuation Work Order for Supply of 1 (one) No. Inspection Vehicle for different JJM Related Works as and when required including supply of driver and fuels (Minimum 8 Hours of duty) under Katwa Sub-Division within Burdwan Division, P.H.E. Dte. Consider 96.00 Km run per Day Assistant Engineer JUNIOR ENGINEER KATWA SUB-DIVISION PHE DTE ORD/000107/2024-2025 485/KTS 16/04/2024 72 AJIT SAMANTA 0.92 0.00 0 10
5799 PURBA BARDHAMAN Mangolkote Central Mechanical HALIMPUR PIPE WATER SUPPLY SCHEME , SM/18343 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Jabagram & others water supply scheme under Mangalkote Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. Driller In-Charge Junior Engineer ORD/000118/2024-2025 2590/CMD 27/08/2024 90 M/S SAJAHAN CHOWDHURY 62.06 0.00 0 0
5800 PURBA BARDHAMAN Mangolkote Burdwan Division HALIMPUR PIPE WATER SUPPLY SCHEME , SM/18343 New Different works related (sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of different capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site) to CHAKULIA, KULSANA & HALIMPUR Piped Water Supply Scheme under MONGALKOTE Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer J.E. katwa,JUNIOR ENGINEER R.W.S. BURDWAN SUB-DIVISION PHE DTE ORD/000461/2023-2024 3443/BWD 08/08/2023 365 ASHOK KUMAR GHOSH 1,588.10 0.00 0 15
5801 PURBA BARDHAMAN Mangolkote Burdwan Division HALIMPUR PIPE WATER SUPPLY SCHEME , SM/18343 New Material Requisition To Resource Division RTOR000015/2024-2025 4109/BWD 25/11/2024 Resource Division 6.90 0.00 0 0
5802 PURBA BARDHAMAN Mangolkote Central Mechanical HALIMPUR PIPE WATER SUPPLY SCHEME , SM/18343 New Quotation for new service connection at Halimpur PWSS TW-1 BILL/01086/2024-2025 BP-2024-25-396 22/11/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 5.11 0.00 0 0
5803 PURBA BARDHAMAN Mangolkote Central Mechanical HALIMPUR PIPE WATER SUPPLY SCHEME , SM/18343 New Quotation for new service connection at Halimpur PWSS TW-2. BILL/01189/2024-2025 BP-2024-25-428 31/01/2025 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 4.02 0.00 0 0
5804 PURBA BARDHAMAN Mangolkote Burdwan Division HALIMPUR PIPE WATER SUPPLY SCHEME , SM/18343 New Balance work of HALIMPUR Piped Water Supply Scheme with sinking of Tube-well, LDS, FHTC & construction of switch rooms & boundary walls with gates and land development, drain and internal pathway at different TW site under Mongalkote Block, District:- Purba-Bardhaman Assistant Engineer ORD/001261/2024-2025 845/BWD 05/03/2025 120 M/S H.R. CONSTRUCTION 248.04 0.00 0 0
5805 PURBA BARDHAMAN Mangolkote Burdwan Division PALISGRAM PIPE WATER SUPPLY SCHEME , SM/18481 New Material Requisition To Resource Division RTOR000360/2023-2024 2197/BWD 12/05/2023 Resource Division 2.93 0.00 0 0
5806 PURBA BARDHAMAN Mangolkote Burdwan Division PALISGRAM PIPE WATER SUPPLY SCHEME , SM/18481 New Material Requisition To Resource Division RTOR000529/2023-2024 4304/BWD 29/09/2023 Resource Division 1.53 0.00 0 0
5807 PURBA BARDHAMAN Mangolkote Burdwan Division PALISGRAM PIPE WATER SUPPLY SCHEME , SM/18481 New Material Requisition To Resource Division RTOR000567/2023-2024 4939/BWD 10/11/2023 Resource Division 27.80 0.00 0 0
5808 PURBA BARDHAMAN Mangolkote Central Mechanical PALISGRAM PIPE WATER SUPPLY SCHEME , SM/18481 New NEW SERVICE CONNECTION FOR PALISHGRAM PWSS. BILL/00006/2024-2025 BP-2024-25-2 04/04/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 4.96 0.00 0 0
5809 PURBA BARDHAMAN Mangolkote Central Mechanical PALISGRAM PIPE WATER SUPPLY SCHEME , SM/18481 New NEW SERVICE CONNECTION FOR PALISHGRAM PH -2 PWSS. BILL/00007/2024-2025 BP-2024-25-3 04/04/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 2.87 0.00 0 0
5810 PURBA BARDHAMAN Mangolkote Central Mechanical PALISGRAM PIPE WATER SUPPLY SCHEME , SM/18481 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1, 2 & 3 at PALISGRAM Water Supply Scheme [ Block-MANGOLKOTE] under CMD, PHE Dte., Dist.- Purba-Bardhaman. Driller In-Charge Junior Engineer ORD/000870/2023-2024 4133/CMD 29/08/2023 30 CHOUDHURY ENTERPRISE 44.62 1.15 2.58 63
5811 PURBA BARDHAMAN Mangolkote Burdwan Division PALISGRAM PIPE WATER SUPPLY SCHEME , SM/18481 New Material Requisition To Resource Division RTOR000010/2024-2025 4114/BWD 25/11/2024 Resource Division 17.51 0.00 0 0
5812 PURBA BARDHAMAN Mangolkote Central Mechanical PALISGRAM PIPE WATER SUPPLY SCHEME , SM/18481 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Lakshimpur & others water supply scheme under Mangalkote Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman Driller In-Charge Junior Engineer ORD/000097/2024-2025 2406/CMD 02/08/2024 290 CHOUDHURY ENTERPRISE 57.65 0.00 0 10
5813 PURBA BARDHAMAN Mangolkote Burdwan Division PALISGRAM PIPE WATER SUPPLY SCHEME , SM/18481 New Different works related (sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of different capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site) to PALISGRAM, PURBA NAYAPARA & SITAHATI Piped Water Supply Scheme under MONGALKOTE Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer JUNIOR ENGINEER KATWA SUB-DIVISION PHE DTE,JUNIOR ENGINEER R.W.S. BURDWAN SUB-DIVISION PHE DTE ORD/000695/2023-2024 4364/BWD 04/10/2023 668 M/S S. CHOUDHURY 1,505.07 0.00 0 77
5814 PURBA BARDHAMAN Mangolkote Burdwan Division PALISGRAM PIPE WATER SUPPLY SCHEME , SM/18481 New Different types of works involve in connection with implementation of Aug. Mongalkote, Palishgram, Purba Nowapara, Sitahati, Singhi, Mejhiary & Karui Piped Water Supply Scheme within Katwa Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer ORD/001191/2024-2025 873/BWD 06/03/2025 180 M/S S. CHOUDHURY 588.22 0.00 0 0
5815 PURBA BARDHAMAN Katwa - I Burdwan Division KARAJGRAM PIPED WATER SUPPLY SCHEME , SM/18483 New Material Requisition To Resource Division RTOR000313/2023-2024 2197/BWD 12/05/2023 Resource Division 13.39 0.00 0 0
5816 PURBA BARDHAMAN Katwa - I Burdwan Division KARAJGRAM PIPED WATER SUPPLY SCHEME , SM/18483 New Material Requisition To Resource Division RTOR000505/2023-2024 4029/BWD 08/09/2023 Resource Division 72.54 0.00 0 0
5817 PURBA BARDHAMAN Katwa - I Central Mechanical KARAJGRAM PIPED WATER SUPPLY SCHEME , SM/18483 New New service connection for Karajgram PWSS PH-1. BILL/02287/2023-2024 BP-2023-24-417 19/01/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 11.35 0.00 0 0
5818 PURBA BARDHAMAN Katwa - I Central Mechanical KARAJGRAM PIPED WATER SUPPLY SCHEME , SM/18483 New Quotation for new service connection for Kharajgram PWSS TW-3 BILL/00341/2024-2025 BP-2024-25-164 01/07/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 4.61 0.00 0 0
5819 PURBA BARDHAMAN Katwa - I Central Mechanical KARAJGRAM PIPED WATER SUPPLY SCHEME , SM/18483 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Jajigram & others water supply scheme under Katwa-I Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman Driller In-Charge Junior Engineer ORD/000069/2024-2025 2399/CMD 02/08/2024 90 SUBRATA BHADRA 55.16 0.00 0 0
5820 PURBA BARDHAMAN Katwa - I Central Mechanical KARAJGRAM PIPED WATER SUPPLY SCHEME , SM/18483 New New service connection charges for Karajgram PWSS TW-2 BILL/01098/2024-2025 BP-2024-25-405 25/11/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 6.19 0.00 0 0
5821 PURBA BARDHAMAN Katwa - I Central Mechanical KARAJGRAM PIPED WATER SUPPLY SCHEME , SM/18483 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1, 2 & 3 at KARAJGRAM Water Supply Scheme [ Block-KATWA-1 ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. Driller In-Charge Junior Engineer ORD/000872/2023-2024 4135/CMD 29/08/2023 610 SOUNAK ENTERPRISE 45.53 0.00 0 66
5822 PURBA BARDHAMAN Katwa - I Burdwan Division KARAJGRAM PIPED WATER SUPPLY SCHEME , SM/18483 New Material Requisition To Resource Division RTOR000078/2024-2025 404/BWD 17/01/2025 Resource Division 4.74 0.00 0 0
5823 PURBA BARDHAMAN Katwa - I Burdwan Division KARAJGRAM PIPED WATER SUPPLY SCHEME , SM/18483 New KARAJGRAM Piped Water Supply Scheme with sinking of Tube-well, LDS,Rising Main, FHTC, Construction of 400 cum capacity RCC OHR with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drain and internal pathway at different TW site under Katwa-I Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer JUNIOR ENGINEER KATWA SUB-DIVISION PHE DTE,Junior Engineer, R.W.S., Katwa-I Dev. Block ORD/000428/2023-2024 3326/BWD 02/08/2023 883 MANASH GHOSH 533.47 84.68 15.87 60
5824 PURBA BARDHAMAN Galsi - I Burdwan Division SHILLA PIPED WATER SUPPLY SCHEME , SM/18344 New Material Requisition To Resource Division RTOR000309/2023-2024 2197/BWD 12/05/2023 Resource Division 11.39 0.00 0 0
5825 PURBA BARDHAMAN Galsi - I Burdwan Division SHILLA PIPED WATER SUPPLY SCHEME , SM/18344 New Material Requisition To Resource Division RTOR000440/2023-2024 3847/BWD 01/09/2023 Resource Division 460.56 0.00 0 0
5826 PURBA BARDHAMAN Galsi - I Burdwan Division SHILLA PIPED WATER SUPPLY SCHEME , SM/18344 New Material Requisition To Resource Division RTOR000774/2023-2024 207/BWD 10/01/2024 Resource Division 57.55 0.00 0 0
5827 PURBA BARDHAMAN Galsi - I Central Drilling SHILLA PIPED WATER SUPPLY SCHEME , SM/18344 New Construction of Tube Well (300 MM x 200 MM x Depth 500 Mtr) for Shilla W/S Scheme(T/W -I) Zone-IV, Block- Galsi-I, Purba Bardhaman District by Central Drilling Division, P.H. Engineering Dte. Driller In Charge Junior Engineer ORD/000216/2023-2024 2236/CDD 11/03/2024 60 SATYAJIT GHOSH 39.72 0.00 0 0
5828 PURBA BARDHAMAN Galsi - I Burdwan Division SHILLA PIPED WATER SUPPLY SCHEME , SM/18344 New Hydro-geological study of Sub Surface Water Flow/Storage Characteristics for Creation of Sustainable Source and Estimation of Sustainable Yield (5 Nos of Schemes) in Purba Bardhaman District, West Bengal towards implementation of water supply project. ORD/000872/2023-2024 5324/BWD 01/12/2023 120 THE REGISTRAR JADAVPUR UNIVERSITY 113.34 0.00 0 100
5829 PURBA BARDHAMAN Galsi - I Central Mechanical SHILLA PIPED WATER SUPPLY SCHEME , SM/18344 New Quotation for new service connection at Shilla PWSS (Naba Khanda) Zone-I. BILL/00783/2024-2025 BP-2024-25-290 13/09/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 7.26 0.00 0 0
5830 PURBA BARDHAMAN Galsi - I Central Mechanical SHILLA PIPED WATER SUPPLY SCHEME , SM/18344 New Quotation for new service connection Shilla PWSS TW No. 3. BILL/00781/2024-2025 BP-2024-25-291 13/09/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 8.32 0.00 0 0
5831 PURBA BARDHAMAN Galsi - I Central Mechanical SHILLA PIPED WATER SUPPLY SCHEME , SM/18344 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for OHR SITE of Zone-1, 2, 3 & 4 at SHILLA Water Supply Scheme [ BLOCK- Galsi-II ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. Driller In-Charge JUNIOR ENGINEER ORD/000561/2024-2025 3101/CMD 11/12/2024 60 S.K. ELECTRICALS 50.24 0.00 0 0
5832 PURBA BARDHAMAN Galsi - I Durgapur W/S Division SHILLA PIPED WATER SUPPLY SCHEME , SM/18344 New Formal Work Order for the work of Sinking of 3 nos 300 x 200mm dia Tube Well-150 mtr and 10 Nos 200 x 200 mm dia River Bank Tube Well- 51 mtr with Construction of Pump House Cum Switch Room Chlorine Room under SHILLA PWSS (JJM) Block- Galsi-I, Distric- Purba Bardhaman under Durgapur W/S Division, PHE Dte Assistant Engineer-II JUNIOR ENGINEER-1 ORD/000060/2024-2025 885/DWSD 26/06/2024 120 M/S S. CHOUDHURY 120.44 0.00 0 100
5833 PURBA BARDHAMAN Galsi - I Durgapur W/S Division SHILLA PIPED WATER SUPPLY SCHEME , SM/18344 New Quotation money for new service connection at SHILLA PWSS under DWSD PHE Dte BILL/00274/2024-2025 BP-2024-25-119 04/02/2025 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED 39.60 0.00 0 null
5834 PURBA BARDHAMAN Galsi - I Durgapur W/S Division SHILLA PIPED WATER SUPPLY SCHEME , SM/18344 New Acceptance cum Formal Work Order for the work of Hiring of LUXURY Diesel Ambassador Car (Inspection Vehicle) for using of the Junior Engineers for the office of the Executive Engineer, Durgapur Water Supply Division, Public Health Engineering Dte at Fagupur, Nababhat, Purba Bardhaman for the period of 01.08.2024 to 31.01.2025 (6 Months) Assistant Engineer-I JUNIOR ENGINEER-2 ORD/000121/2024-2025 1108/DWSD 01/08/2024 180 SIDDHARTH ENTERPRISE 0.82 0.80 97.56 0
5835 PURBA BARDHAMAN Galsi - I Durgapur W/S Division SHILLA PIPED WATER SUPPLY SCHEME , SM/18344 New Additional quotation for effecting new service connections at Nabakhanda under Shilla PWSS (Zone-I) BILL/00286/2024-2025 BP-2024-25-123 10/02/2025 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED 5.67 0.00 0 null
5836 PURBA BARDHAMAN Galsi - I Durgapur W/S Division SHILLA PIPED WATER SUPPLY SCHEME , SM/18344 New Acceptance cum Formal Work Order for Design Engineering Services of Survey, General arrangement drawing, Pile foundation design and drawings, Pipe Pedestal and BOM, Structural design design and drawing, Fabrication drawings for 26 Numbers different dia meter pipe crossing Pipe Bridge at "PURANGAN (Zone-I, II, III), 11 Nos. Mouzas under PURSHA and UCHCHGRAM, SHILLA (Zone-I, II, III, IV), TAHER PUR (Zone-I, II, III) and KHANO (Zone-I and II) sites under Durgapur W/S Division,PHE Dte. Assistant Engineer-II JUNIOR ENGINEER-2 ORD/000105/2024-2025 1058/DWSD 25/07/2024 270 ASTER CONSULTANCY 47.43 0.00 0 70
5837 PURBA BARDHAMAN Galsi - I Central Mechanical SHILLA PIPED WATER SUPPLY SCHEME , SM/18344 New Providing Mechanical/Electrical equipment with all ancillaries and auxiliaries including intake (Low lift) pumping machineries, illumination arrangement of Shilla Sub-Surface Based Piped Water Supply Scheme under Purba Bardhaman District PHE Dte. Driller In-Charge JUNIOR ENGINEER ORD/000781/2024-2025 481/CMD 06/02/2025 75 JAL PRAVAHIKA PVT LTD 0.00 0.00 NAN 0
5838 PURBA BARDHAMAN Galsi - I Burdwan Division SHILLA PIPED WATER SUPPLY SCHEME , SM/18344 New Sub Surface Based Piped Water Supply Scheme with LDS, FHTC, Construction of different capacity RCC OHRs with 20.0 mtr. with Staging height including soil investigation, Construction of CWR, Chlorine Room, Guard Room, Sub Station Building, High Lift Pump House Boundary walls with gates, land development, drain and internal pathway of SHILLA Piped Water Supply Scheme under Galsi-I Block, District:- Purba-Bardhaman [NEW SCHEME] ORD/000455/2023-2024 3437/BWD 08/08/2023 725 M/S S. CHOUDHURY 2,687.54 0.00 0 60
5839 PURBA BARDHAMAN Galsi - I Durgapur W/S Division SHILLA PIPED WATER SUPPLY SCHEME , SM/18344 New Formal Work Order for Laying of Rising Main including Jack Pushing and construction of Pipe Carring Bridge with Pipe supporting structure under SHILLA PIPED W/S SCHMEME under Durgapur W/S Division, PHE Dte. Assistant Engineer-II JUNIOR ENGINEER-1 ORD/000160/2024-2025 1500/DWSD 05/11/2024 246 M/S S. CHOUDHURY 1,099.00 0.00 0 45
5840 PURBA BARDHAMAN Galsi - I Durgapur W/S Division SHILLA PIPED WATER SUPPLY SCHEME , SM/18344 New Acceptance cum Formal Work Order for Preparation and Submission of Structural Design Calculation (Civil) & Structural drawing of Proposed CWR with M.S Structural Pump House over cwr, WBSEDCL Mettering Room and - PDB Room -2 Nos, Transformer yeard -2 nos, Chlorin Room -1 No with General Arrangement Drawing of InternalRoad - Drain & necessary Soil investigation at Intake Site of "SHILLA (Zone-I, II, III &IV ) PWSS under Durgapur W/s Division, PHE Dte. Assistant Engineer-II JUNIOR ENGINEER-1,JUNIOR ENGINEER-2 ORD/000191/2024-2025 1606/DWSD 26/11/2024 45 M/S S. CHOUDHURY 9.48 0.00 0 100
5841 PURBA BARDHAMAN Galsi - I Central Mechanical SHILLA PIPED WATER SUPPLY SCHEME , SM/18344 New Providing Mechanical/Electrical equipment with all ancillaries and auxiliaries including intake (Low lift) pumping machineries, illumination arrangement of Shilla Sub-Surface Based Piped Water Supply Scheme under Purba Bardhaman District PHE Dte. Driller In-Charge Junior Engineer ORD/000004/2025-2026 906/CMD 04/04/2025 75 JAL PRAVAHIKA PVT LTD 131.56 0.00 0 0
5842 PURBA BARDHAMAN Galsi - I Central Mechanical SHILLA PIPED WATER SUPPLY SCHEME , SM/18344 New Providing Mechanical/Electrical equipment with all ancillaries and auxiliaries including High Lift pumping machineries, 0-1 kg/hour gaseous chlorination system of Shilla Sub-Surface Based Piped Water Supply Scheme under Purba Bardhaman District PHE Dte. Driller In-Charge JUNIOR ENGINEER ORD/000001/2025-2026 903/CMD 04/04/2025 75 DEY ENTERPRISE 211.00 0.00 0 0
5843 PURBA BARDHAMAN Galsi - I Durgapur W/S Division SHILLA PIPED WATER SUPPLY SCHEME , SM/18344 New CONTINUTION ORDER FOR Hiring of LUXURY Disel Ambassador Car (Inspection Vehicle) for using of the Junior Engineers for the Office of the EE, Durgapur W/S Division, PHE Dte at Nababhat, Fagupur, Purba Bardhaman for the period of 01.02.2025 to 30.04.2025. (VEHICLE NO WB/04H-5935) Assistant Engineer-I JUNIOR ENGINEER-2 ORD/000263/2024-2025 184/DWSD 28/01/2025 90 SIDDHARTH ENTERPRISE 0.41 0.00 0 33
5844 PURBA BARDHAMAN Galsi - I Durgapur W/S Division SHILLA PIPED WATER SUPPLY SCHEME , SM/18344 New Material Requisition To Resource Division RTOR000001/2025-2026 648/DWSD 22/04/2025 Resource Division 27.23 0.00 0 0
5845 PURBA BARDHAMAN Galsi - I Durgapur W/S Division SHILLA PIPED WATER SUPPLY SCHEME , SM/18344 New CONTINUTION ORDER FOR Hiring of LUXURY Disel Ambassador Car (Inspection Vehicle) for using of the Junior Engineers for the Office of the EE, Durgapur W/S Division, PHE Dte at Nababhat, Fagupur, Purba Bardhaman for the period of 01.05.2025 to 31.07.2025. (VEHICLE NO WB/04H-5935) Assistant Engineer-I JUNIOR ENGINEER-2 ORD/000016/2025-2026 679/DWSD 25/04/2025 90 SIDDHARTH ENTERPRISE 0.41 0.00 0 0
5846 PURBA BARDHAMAN Memari - I Burdwan Division NUDIPUR PIPED WATER SUPPLY SCHEME , SM/18834 New Material Requisition To Resource Division RTOR000358/2023-2024 2197/BWD 12/05/2023 Resource Division 19.77 0.00 0 0
5847 PURBA BARDHAMAN Memari - I Burdwan Division NUDIPUR PIPED WATER SUPPLY SCHEME , SM/18834 New Material Requisition To Resource Division RTOR000533/2023-2024 4295/BWD 29/09/2023 Resource Division 3.92 0.00 0 0
5848 PURBA BARDHAMAN Memari - I Burdwan Division NUDIPUR PIPED WATER SUPPLY SCHEME , SM/18834 New Material Requisition To Resource Division RTOR000684/2023-2024 5057/BWD 23/11/2023 Resource Division 20.46 0.00 0 0
5849 PURBA BARDHAMAN Memari - I Central Mechanical NUDIPUR PIPED WATER SUPPLY SCHEME , SM/18834 New New service connection at Nudipur PWSS PH-2 BILL/02354/2023-2024 BP-2023-24-468 31/01/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 4.43 0.00 0 0
5850 PURBA BARDHAMAN Memari - I Central Mechanical NUDIPUR PIPED WATER SUPPLY SCHEME , SM/18834 New New service connection at Nudipur PWSS PH-1 BILL/02356/2023-2024 BP-2023-24-467 31/01/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 13.67 0.00 0 0
5851 PURBA BARDHAMAN Memari - I Burdwan Division NUDIPUR PIPED WATER SUPPLY SCHEME , SM/18834 New Different works related (sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of different capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site) to CHANCHAL & NUDIPUR Piped Water Supply Scheme under Memari I Block, District:- Purba-Bardhaman [NEW SCHEME] ORD/000692/2023-2024 4389/BWD 05/10/2023 365 MANASH GHOSH 1,343.97 0.00 0 20
5852 PURBA BARDHAMAN Memari - I Central Mechanical NUDIPUR PIPED WATER SUPPLY SCHEME , SM/18834 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at SAHAPUR & others water supply scheme under Memari-I Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. ASSISTANT ENGINEER Junior Engineer ORD/000100/2024-2025 2392/CMD 02/08/2024 90 MITRA ENTERPRISE 47.62 0.00 0 0
5853 PURBA BARDHAMAN Memari - I Central Mechanical NUDIPUR PIPED WATER SUPPLY SCHEME , SM/18834 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at Nudipur Water Supply Scheme [ Block- Memari-1] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER Junior Engineer ORD/001092/2023-2024 4512/CMD 06/10/2023 30 JAL PRAVAHIKA PVT LTD 28.96 22.89 79.04 95
5854 PURBA BARDHAMAN Memari - I Burdwan Division NUDIPUR PIPED WATER SUPPLY SCHEME , SM/18834 New Continuation Work Order for supply of inspection Vehicle for inspection of different JJM related (schemes)works as and when required including supply of driver & fuel(minimum 8 hours duty per day) and all taxes etc. for Burdwan Sub-Division under Burdwan Division,PHE Dte consider 96.00 Km. run per day (Period from 01-08-2024 to 31-10-2024) JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000557/2024-2025 1500/BSD 30/07/2024 66 PARVIN BEGAM 0.85 0.28 32.94 100
5855 PURBA BARDHAMAN Memari - I Burdwan Division NUDIPUR PIPED WATER SUPPLY SCHEME , SM/18834 New Restoration of concrete road by Cement concrete (mix 1:1.5:3), Providing balance FHTC, parallel pipeline, drainage system, boundary wall, Bridge, land development, Sluice valve chamber for smooth water supply of FHTC work for NUDIPUR PWSS and its adjoining mouzas within MEMARI-I BLOCK under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/001115/2024-2025 477/BWD 24/01/2025 90 SHIVAM UN-EMPLOYED ENGINEERS CO-OPERATIVE SOCIETY LTD. 64.73 0.00 0 0
5856 PURBA BARDHAMAN Memari - I Burdwan Division NUDIPUR PIPED WATER SUPPLY SCHEME , SM/18834 New Continuation work order for "Supply of one No. Diesel Driven Ambassador Car on hire basis for the office of the Assistant Engineer, Burdwan Sub-Division, PHE Dte. (Period from 01-12-2024 to 28-02-2025 JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/001043/2024-2025 2636/BSD 29/11/2024 90 SK. ASFIA 1.20 0.00 0 60
5857 PURBA BARDHAMAN Galsi - II Burdwan Division Sanko Piped Water Supply Scheme , SM/18407 New Material Requisition To Resource Division RTOR000282/2023-2024 2197/BWD 12/05/2023 Resource Division 7.07 0.00 0 0
5858 PURBA BARDHAMAN Galsi - II Burdwan Division Sanko Piped Water Supply Scheme , SM/18407 New Material Requisition To Resource Division RTOR000445/2023-2024 3832/BWD 01/09/2023 Resource Division 191.84 0.00 0 0
5859 PURBA BARDHAMAN Galsi - II Central Mechanical Sanko Piped Water Supply Scheme , SM/18407 New New service connection charges for Sanko PWSS TW-1 BILL/02193/2023-2024 BP-2023-24-373 16/01/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 4.63 0.00 0 0
5860 PURBA BARDHAMAN Galsi - II Central Mechanical Sanko Piped Water Supply Scheme , SM/18407 New New service connection for Sanko PWSS . BILL/02409/2023-2024 BP-2023-24-508 06/02/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 5.10 0.00 0 0
5861 PURBA BARDHAMAN Galsi - II Central Mechanical Sanko Piped Water Supply Scheme , SM/18407 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Satinandi,Sanko & others water supply scheme under Galsi-1 Block ; Serpur, Uchalan & others water supply scheme under Raina-2 Block and maro, loapur & others water supply scheme under Galsi-2 block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000397/2024-2025 2751/CMD 24/09/2024 90 ORIENTAL ENGINEERING CO. 88.42 0.00 0 0
5862 PURBA BARDHAMAN Galsi - II Durgapur W/S Division Sanko Piped Water Supply Scheme , SM/18407 New Material Requisition To Resource Division RTOR000001/2024-2025 1724/M/DWSD 10/12/2024 Resource Division 16.63 0.00 0 0
5863 PURBA BARDHAMAN Galsi - II Central Mechanical Sanko Piped Water Supply Scheme , SM/18407 New Quotation for new service connection at Sanko PWSS TW 3 BILL/01228/2024-2025 BP-2024-25-417 16/12/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 6.83 0.00 0 0
5864 PURBA BARDHAMAN Galsi - II Durgapur W/S Division Sanko Piped Water Supply Scheme , SM/18407 New FORMAL WORK ORDER FOR Sinking of 300 X 200mm dia Tube Well, Pump House , Boundary Wall , Concrete Road & Bituminous Road Restoration, Jack Pushing with Laying of M.S Pipe, FHTC , Land development of H/W Site, drain & internal Path Way, Laying of M.S Pipe under Sanko PWSS (JJM) Block - GALSI -II, District:- Purba Bardhaman, under DURGAPUR W/S DIVISION , PHE Dte. Assistant Engineer-II Contractual Junior Engineer_5,JUNIOR ENGINEER-2 ORD/000260/2024-2025 180/DWSD 28/01/2025 120 NATIONAL CONSTRUCTION 185.88 0.00 0 0
5865 PURBA BARDHAMAN Galsi - II Central Mechanical Sanko Piped Water Supply Scheme , SM/18407 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1, 2 & 3 at SANKO Water Supply Scheme [ Block- GALSI-2 ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. Driller In-Charge JUNIOR ENGINEER ORD/000782/2023-2024 4075/CMD 29/08/2023 615 BENGAL CONSTRUCTION. 41.68 0.00 0 96
5866 PURBA BARDHAMAN Galsi - II Burdwan Division Sanko Piped Water Supply Scheme , SM/18407 New SANKO Piped Water Supply Scheme with sinking of Tube-well, LDS, Rising Main, FHTC, Construction of 600 cum capacity RCC OHR with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drain and internal pathway at different TW site under Galsi-II Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer2, Durgapur Sub-Division, PHE Dte. ORD/000415/2023-2024 3269/BWD 28/07/2023 625 NATIONAL CONSTRUCTION 868.03 0.00 0 60
5867 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Sahhosenpur Piped Water Supply Scheme at Jamalpur Block , SM/07813 Retrofitting Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of Sahahosenpur Piped Water Supply Scheme at Srikrishnapur Village, Rajarampur Village (2 Nos. habitations), Paikpara Village, Jotdakshin Village & Jotsriram Village, Jamalpur Block under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000646/2020-2021 1690/BWD 24/02/2021 60 DIPAK ROY 70.56 54.32 76.98 1
5868 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Sahhosenpur Piped Water Supply Scheme at Jamalpur Block , SM/07813 Retrofitting Construction of boundary wall including land development at 3rd Tube Well site of Sahhosenpur water supply scheme under Jamalpur Block of Burdwan Division, PHE Dte. (Length -58.00 Mtr, Col-21 Nos). GROUP : D Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000083/2022-2023 817/BSD 20/05/2022 45 SARKAR CONSTRUCTION 3.47 0.00 0 1
5869 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Sahhosenpur Piped Water Supply Scheme at Jamalpur Block , SM/07813 Retrofitting Extension of pipeline including providing FHTC for SAHHOSENPUR Piped Water Supply Scheme at Jotdakshin (6 Nos), Jotshiram (20 Nos) Habitation for Sajal Gram (As per field verification report duly signed by Pradhan for Har Ghar Jal Certification) within Jamalpur Block under Burdwan Division, PHE Dte. Gr.T. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000356/2022-2023 1341/BSD 02/08/2022 5 ROY BISWAS CONSTRUCTION 0.95 0.00 0 1
5870 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Sahhosenpur Piped Water Supply Scheme at Jamalpur Block , SM/07813 Retrofitting Continuation work order for Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Sahahosenpur (Part) village (Sahahosenpur (Part) habitation) of Sahahosenpur Piped Water Supply Scheme within Burdwan Sub-Divn. under Burdwan Division, PHE. Dte. (Part - A) [Sl. No. : ¿17¿] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000539/2020-2021 816/BWD 01/02/2021 15 ROY BISWAS CONSTRUCTION 4.86 4.86 100 1
5871 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Sahhosenpur Piped Water Supply Scheme at Jamalpur Block , SM/07813 Retrofitting Extension of pipeline for Sahhosenpur water supply scheme at Sahhosenpur village (Near Masjid) within Jamalpur Block under Burdwan Division, PHE Dte.[Gr.-B] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000281/2021-2022 1212/BSD 09/09/2021 30 ROY BISWAS CONSTRUCTION 4.96 0.00 0 1
5872 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Sahhosenpur Piped Water Supply Scheme at Jamalpur Block , SM/07813 Retrofitting Extension of pipeline for Sahhosenpur water supply scheme at Jotsrirram village within Jamalpur Block under Burdwan Division, PHE Dte.[Gr.-C] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000320/2021-2022 1333/BSD 30/09/2021 30 PREMANANDA ROY BISWAS 4.52 0.00 0 1
5873 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Sahhosenpur Piped Water Supply Scheme at Jamalpur Block , SM/07813 Retrofitting Pipeline laying at different culvert crossing for damage of PMGSY Road of Sahhosenpur water supply scheme at Jamalpur Block under Burdwan Division, PHE Dte. [Gr.-F] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000552/2021-2022 1481/BSD 09/11/2021 30 ROY BISWAS CONSTRUCTION 3.53 0.00 0 1
5874 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Sahhosenpur Piped Water Supply Scheme at Jamalpur Block , SM/07813 Retrofitting Extension of pipeline for Sahhosenpur water supply scheme at Srikrishnapur and Rajarampur village within Jamalpur Block under Burdwan Division, PHE Dte.[Gr.-H] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000553/2021-2022 1483/BSD 09/11/2021 30 DIPAK ROY 4.70 0.00 0 1
5875 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Sahhosenpur Piped Water Supply Scheme at Jamalpur Block , SM/07813 Retrofitting Extension of pipeline for Sahhosenpur water supply scheme at Jotdakshin village within Jamalpur Block under Burdwan Division, PHE Dte.[Gr.-D] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000555/2021-2022 1524/BSD 18/11/2021 30 THREE MAA ENTERPRISE 4.81 0.00 0 1
5876 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Sahhosenpur Piped Water Supply Scheme at Jamalpur Block , SM/07813 Retrofitting Extension of pipeline for Providing FHTC at Srikrishnapur village under SAHAHOSENPUR Piped Water Supply Scheme at Srikrishnapur village within Jamalpur Block , under Burdwan Division, PHE Dte. Group : B Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000089/2022-2023 829/BSD 23/05/2022 30 MMS CONSTRUCTIONS PVT LTD 4.62 4.54 98.27 1
5877 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Sahhosenpur Piped Water Supply Scheme at Jamalpur Block , SM/07813 Retrofitting Construction of different slab of damage valve chamber due to widening of PMGSY ROAD and sand filling of PMGSY ROAD of Sahahossenpur water supply scheme under Jamalpur Block of Burdwan Division, PHE Dte. Gr.E. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000092/2022-2023 832/BSD 23/05/2022 30 ROY BISWAS CONSTRUCTION 2.68 0.00 0 1
5878 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Sahhosenpur Piped Water Supply Scheme at Jamalpur Block , SM/07813 Retrofitting Laying of interconnection of the Pump No.-1, 2 & 3 with OHR and distribution main of 350 mm dia for Sahhosenpur water supply scheme within Jamalpur Block under Burdwan Division, PHE Dte.[Gr.-C] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000720/2021-2022 1482/BSD 09/11/2021 30 THREE MAA ENTERPRISE 4.83 4.83 100 1
5879 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Sahhosenpur Piped Water Supply Scheme at Jamalpur Block , SM/07813 Retrofitting Hire & fuel charges of vehicle Car No.-wb-41H-9788 for the month of August'2023 BILL/01037/2023-2024 747/JJM 11/10/2023 SK. ASRAFUDDIN 0.40 0.00 0 0
5880 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Sahhosenpur Piped Water Supply Scheme at Jamalpur Block , SM/07813 Retrofitting Hire & fuel charges of vehicle Car No.-WB-41G-8280 for the month of January to July'2023. BILL/01042/2023-2024 852/JJM 30/10/2023 MD HASIN 2.50 0.00 0 0
5881 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Sahhosenpur Piped Water Supply Scheme at Jamalpur Block , SM/07813 Retrofitting Vehicle bill for the month of October'2023. BILL/01678/2023-2024 1040/JJM 11/12/2023 SK.ASFIA 0.38 0.00 0 0
5882 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Sahhosenpur Piped Water Supply Scheme at Jamalpur Block , SM/07813 Retrofitting Vehicle Bill (Car No.-WB-41H-9788) for the month of October'2023. BILL/01677/2023-2024 1033/JJM 11/12/2023 SK. ASRAFUDDIN 0.37 0.00 0 0
5883 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Sahhosenpur Piped Water Supply Scheme at Jamalpur Block , SM/07813 Retrofitting Vehicle Bill [Car No.-WB-41H-9788] for the month of December'23. BILL/02062/2023-2024 1322/JJM 01/02/2024 SK. ASRAFUDDIN 0.40 0.00 0 0
5884 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Sahhosenpur Piped Water Supply Scheme at Jamalpur Block , SM/07813 Retrofitting Replace Damaged & deface FHTC(By WBSRDA)with all with accessories within the command area of SAHHOSENPUR Piped W/S Scheme at SahhosenpurSaikh Para and Rajarampur village,Jamalpur Development Block under Burdwan Division,PHE Dte. RWS_JAMALPUR ORD/000156/2024-2025 1045/BSD 10/06/2024 30 SARKAR CONSTRUCTION 0.83 0.00 0 100
5885 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Sahhosenpur Piped Water Supply Scheme at Jamalpur Block , SM/07813 Retrofitting Construction of Boundary wall, Land Development for various PWSS, Block- Jamalpur, District:- Purba-Bardhaman within Burdwan Sub Division under Burdwan Division PHE Dte. AE(HQs) ORD/001100/2024-2025 433/BWD 20/01/2025 120 RABINDRA NATH GORANG 132.64 0.00 0 0
5886 PURBA BARDHAMAN Burdwan Division Operational charges of PHED & NGO Managed Laboratories related to Water Quality Monitoring & Surveillance under Jal Jeevan Mission , SM/19071 Support-WQMSP SupervisionandextendsupporttoNABLrecognizedWaterQualityTestingBlocklevelLaboratoryunderTheExecutiveEngineer,BurdwanDivision,PublicHealthEngineeringDirectorate,GovernmentofWestBengalbyassigningteamofcompetentresourcepersonnelwhowillbeengagedforcompletesupervisionforretainingNABLrecognitionandcompilationofpreparatoryup-to-datedocumentation,Calibrationforon-sitesurveillancebyNABL(asperNABL139)foraperiodofonemonthfromthedateofcommencement.(NameofSDL: Sankari Sub District Water Testing Laboratory under Burdwan Sadar Sub Division.) Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000976/2023-2024 3059/BSD 29/12/2023 45 BHARATI CHEMICAL AND SCIENTIFIC WORKS 0.90 0.00 0 0
5887 PURBA BARDHAMAN Burdwan Division Operational charges of PHED & NGO Managed Laboratories related to Water Quality Monitoring & Surveillance under Jal Jeevan Mission , SM/19071 Support-WQMSP SupervisionandextendsupporttoNABLrecognizedWaterQualityTestingBlocklevelLaboratoryunderTheExecutiveEngineer,BurdwanDivision,PublicHealthEngineeringDirectorate,GovernmentofWestBengalbyassigningteamofcompetentresourcepersonnelwhowillbeengagedforcompletesupervisionforretainingNABLrecognitionandcompilationofpreparatoryup-to-datedocumentation,Calibrationforon-sitesurveillancebyNABL(asperNABL139)foraperiodofonemonthfromthedateofcommencement.(NameofSDL:Sehera Sub District Water Testing Laboratory under Burdwan Sadar Sub Division Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000977/2023-2024 3060/BSD 29/12/2023 45 BHARATI CHEMICAL AND SCIENTIFIC WORKS 0.51 0.00 0 0
5888 PURBA BARDHAMAN Burdwan Division Operational charges of PHED & NGO Managed Laboratories related to Water Quality Monitoring & Surveillance under Jal Jeevan Mission , SM/19071 Support-WQMSP Repair & renovation of Barsul Sub District Water Testing Laboratory under Burdwan Division, P.H.E. Dte. J.E. 1 BURDWAN ORD/001068/2023-2024 1018/AE/HQ 28/12/2023 30 PRATIVA CONSTRUCTION 4.24 0.00 0 100
5889 PURBA BARDHAMAN Burdwan Division Operational charges of PHED & NGO Managed Laboratories related to Water Quality Monitoring & Surveillance under Jal Jeevan Mission , SM/19071 Support-WQMSP Installation of Aquaguard purifier at Four nos Laboratories (SDWTL) (Dr. ChatterjeeVWS,Aikyatan,Shastri Smriti Sangha,Barshul) under Burdwan Division, PHE Dte. ASSISTANT ENGINEER R.W.S. BURDWAN SUB-DIVISION PHE DTE Junior Engineer, Burdwan Sadar Sub-Division ORD/001088/2023-2024 98/RWS 13/03/2024 15 KHUSI BHAKAT 0.88 0.00 0 100
5890 PURBA BARDHAMAN Burdwan Division Operational charges of PHED & NGO Managed Laboratories related to Water Quality Monitoring & Surveillance under Jal Jeevan Mission , SM/19071 Support-WQMSP Installation of Aquaguard purifier at District Laboratory with meeting hall at Nababhat P.H.E. Complex within RWS Burdwan Sub-Division, under Burdwan Division. ASSISTANT ENGINEER R.W.S. BURDWAN SUB-DIVISION PHE DTE Junior Engineer, R.W.S. Burdwan Sub Division, P.H.E. Dt ORD/001176/2023-2024 05/RWS 05/01/2024 7 KHUSI BHAKAT 0.21 0.00 0 100
5891 PURBA BARDHAMAN Burdwan Division Operational charges of PHED & NGO Managed Laboratories related to Water Quality Monitoring & Surveillance under Jal Jeevan Mission , SM/19071 Support-WQMSP Estimate for Operational charges and supply of different office articles of Burdwan District Laboratory under Burdwan Division, PHE Dte. (Period from 01.04.2024 to 31.03.2025 ) Junior Engineer, R.W.S. Burdwan Sub Division, P.H.E. Dt ORD/000082/2024-2025 122/RWS 01/04/2024 365 ALAKA GHOSH 0.99 0.00 0 0
5892 PURBA BARDHAMAN Burdwan Division Operational charges of PHED & NGO Managed Laboratories related to Water Quality Monitoring & Surveillance under Jal Jeevan Mission , SM/19071 Support-WQMSP Salary payment for the month of March'2024. BILL/00190/2024-2025 294/JJM 29/05/2024 AIKYATAN DEVELOPMENT SOCIETY 0.45 0.00 0 0
5893 PURBA BARDHAMAN Burdwan Division Operational charges of PHED & NGO Managed Laboratories related to Water Quality Monitoring & Surveillance under Jal Jeevan Mission , SM/19071 Support-WQMSP Salary payment for the month of March'2024. BILL/00189/2024-2025 293/JJM 29/05/2024 SHASTRI SMRITI SANGHA 0.45 0.00 0 0
5894 PURBA BARDHAMAN Burdwan Division Operational charges of PHED & NGO Managed Laboratories related to Water Quality Monitoring & Surveillance under Jal Jeevan Mission , SM/19071 Support-WQMSP Salary payment for the month of March'2024. BILL/00191/2024-2025 295/JJM 29/05/2024 DR CHATTERJEES VILLAGE WELFARE SOCIETY 0.45 0.00 0 0
5895 PURBA BARDHAMAN Burdwan Division Operational charges of PHED & NGO Managed Laboratories related to Water Quality Monitoring & Surveillance under Jal Jeevan Mission , SM/19071 Support-WQMSP Salary Bill for the month of April-2024 BILL/00259/2024-2025 371/JJM 21/06/2024 SHASTRI SMRITI SANGHA 0.45 0.00 0 null
5896 PURBA BARDHAMAN Burdwan Division Operational charges of PHED & NGO Managed Laboratories related to Water Quality Monitoring & Surveillance under Jal Jeevan Mission , SM/19071 Support-WQMSP Grant the Remuneration of lab staff for the month of April-2024. BILL/00263/2024-2025 369/JJM 21/06/2024 DR CHATTERJEES VILLAGE WELFARE SOCIETY 0.45 0.00 0 null
5897 PURBA BARDHAMAN Burdwan Division Operational charges of PHED & NGO Managed Laboratories related to Water Quality Monitoring & Surveillance under Jal Jeevan Mission , SM/19071 Support-WQMSP Remuneration of Laboratory Personal for the month April-2024 BILL/00261/2024-2025 370/JJM 21/06/2024 AIKYATAN DEVELOPMENT SOCIETY 0.45 0.00 0 null
5898 PURBA BARDHAMAN Burdwan Division Operational charges of PHED & NGO Managed Laboratories related to Water Quality Monitoring & Surveillance under Jal Jeevan Mission , SM/19071 Support-WQMSP Continuation work for Engagement of Laboratory personnel (Chemist/Bacteriologist and Lab Assistant) including maintenance in 3 Nos. Sub District Laboratories within Headquarters under Burdwan Division, PHE Dte., Purba Bardhaman. [Period from 01.03.2024 to 31.05.2024] AE(HQs) J.E. 1 BURDWAN ORD/001153/2023-2024 812/BWD 27/02/2024 90 DULAL MAJUMDER 5.30 0.00 0 100
5899 PURBA BARDHAMAN Burdwan Division Operational charges of PHED & NGO Managed Laboratories related to Water Quality Monitoring & Surveillance under Jal Jeevan Mission , SM/19071 Support-WQMSP SALARY BILL FOR THE MONTH OF MAY-2024' BILL/00260/2024-2025 461/JJM 02/07/2024 SHASTRI SMRITI SANGHA 0.45 0.00 0 null
5900 PURBA BARDHAMAN Burdwan Division Operational charges of PHED & NGO Managed Laboratories related to Water Quality Monitoring & Surveillance under Jal Jeevan Mission , SM/19071 Support-WQMSP Laboratory contingency charges bill [Period January'22 to June'22] BILL/00282/2024-2025 446/JJM 02/07/2024 SIDHU KANU GRAM UNNAYAN SAMITY 0.40 0.00 0 0
5901 PURBA BARDHAMAN Burdwan Division Operational charges of PHED & NGO Managed Laboratories related to Water Quality Monitoring & Surveillance under Jal Jeevan Mission , SM/19071 Support-WQMSP SALARY BILL FOR THE MONTH OF MAY-2024. BILL/00264/2024-2025 460/JJM 02/07/2024 DR CHATTERJEES VILLAGE WELFARE SOCIETY 0.45 0.00 0 null
5902 PURBA BARDHAMAN Burdwan Division Operational charges of PHED & NGO Managed Laboratories related to Water Quality Monitoring & Surveillance under Jal Jeevan Mission , SM/19071 Support-WQMSP SALARY BILL FOR THE MONTH OF MAY-2024' BILL/00262/2024-2025 459/JJM 02/07/2024 AIKYATAN DEVELOPMENT SOCIETY 0.45 0.00 0 null
5903 PURBA BARDHAMAN Burdwan Division Operational charges of PHED & NGO Managed Laboratories related to Water Quality Monitoring & Surveillance under Jal Jeevan Mission , SM/19071 Support-WQMSP Continuation work for Engagement of Laboratory personnel (Chemist/Bacteriologist and Lab Assistant) including maintenance in 2 Nos. Sub District Laboratories within Burdwan Sadar Sub Division under Burdwan Division, PHE Dte., Purba Bardhaman. [Period from 01.03.2024 to 31.05.2024] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/001156/2023-2024 830/BWD 28/02/2024 90 DULAL MAJUMDER 2.99 0.00 0 100
5904 PURBA BARDHAMAN Burdwan Division Operational charges of PHED & NGO Managed Laboratories related to Water Quality Monitoring & Surveillance under Jal Jeevan Mission , SM/19071 Support-WQMSP Continuation work for Engagement of Laboratory personnel (Sampling Assistant) in Bananabagram Sub District Laboratory within Headquarters under Burdwan Division, PHE Dte., Purba Bardhaman. [Period for 01.03.2024 to 31.05.2024]. AE(HQs) J.E. 1 BURDWAN ORD/001158/2023-2024 145/AE/HQ 28/02/2024 90 DULAL MAJUMDER 0.37 0.00 0 100
5905 PURBA BARDHAMAN Burdwan Division Operational charges of PHED & NGO Managed Laboratories related to Water Quality Monitoring & Surveillance under Jal Jeevan Mission , SM/19071 Support-WQMSP Continuation work for Engagement of Laboratory personnel (Chemist/Bacteriologist and Lab Assistant) including maintenance in 4 Nos. Sub District Laboratories within Kalna Sub Division under Burdwan Division, PHE Dte., Purba Bardhaman. [Period from 01.03.2024 to 31.05.2024] Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/001157/2023-2024 858/BWD 29/02/2024 90 DULAL MAJUMDER 7.59 0.00 0 50
5906 PURBA BARDHAMAN Burdwan Division Operational charges of PHED & NGO Managed Laboratories related to Water Quality Monitoring & Surveillance under Jal Jeevan Mission , SM/19071 Support-WQMSP Installation of Aquaguard purifier at 03 (Three) nos Laboratories (SDWTL) (Sehara, Sankari, Anukhal) under Burdwan Division, PHE Dte. Contractual Junior Engineer ORD/000250/2024-2025 192/RWS 18/06/2024 7 GHOSH ENTERPRISE 0.72 0.00 0 100
5907 PURBA BARDHAMAN Burdwan Division Operational charges of PHED & NGO Managed Laboratories related to Water Quality Monitoring & Surveillance under Jal Jeevan Mission , SM/19071 Support-WQMSP Supply of Residual Chlorine Kit and engagement of Laboratory personnel (Chemist/Bacteriologist/ Lab Assistant and Sampling Assistant) including maintenance in 1 No. Sub District Laboratory within Durgapur sub Division under Burdwan Division, PHE Dte., Purba Bardhaman. [Period For Twelve Months] i.e. period from 01.08.2024 to 31.07.2025. Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000371/2024-2025 2963/BWD 31/07/2024 365 DULAL MAJUMDER 10.49 0.00 0 0
5908 PURBA BARDHAMAN Burdwan Division Operational charges of PHED & NGO Managed Laboratories related to Water Quality Monitoring & Surveillance under Jal Jeevan Mission , SM/19071 Support-WQMSP Supply of Residual Chlorine Kit and engagement of Laboratory personnel (Chemist/Bacteriologist/ Lab Assistant and Sampling Assistant) including maintenance in 2 Nos. Sub District Laboratories within Burdwan Sadar Sub Division under Burdwan Division, PHE Dte., Purba Bardhaman. [Period For Twelve Months] i.e. period from 01.08.2024 to 31.07.2025. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000370/2024-2025 2962/BWD 31/07/2024 365 BHARATI CHEMICAL AND SCIENTIFIC WORKS 19.04 0.00 0 0
5909 PURBA BARDHAMAN Burdwan Division Operational charges of PHED & NGO Managed Laboratories related to Water Quality Monitoring & Surveillance under Jal Jeevan Mission , SM/19071 Support-WQMSP Installation of Aquaguard purifier at 03 (Three) nos Laboratories (SDWTL) (Satgachia, Monteswar, Parulia) under Burdwan Division, PHE Dte. Contractual Junior Engineer ORD/000253/2024-2025 193/RWS 18/06/2024 7 DAS ENTERPRISE 0.72 0.00 0 100
5910 PURBA BARDHAMAN Burdwan Division Operational charges of PHED & NGO Managed Laboratories related to Water Quality Monitoring & Surveillance under Jal Jeevan Mission , SM/19071 Support-WQMSP Installation of Aquaguard purifier at 03 (Three) nos Laboratories (SDWTL) (Saktigarh, Ganganandapur, Bonnobogram) under Burdwan Division, PHE Dte. Contractual Junior Engineer ORD/000254/2024-2025 194/RWS 18/06/2024 7 KHUSI BHAKAT 0.73 0.00 0 100
5911 PURBA BARDHAMAN Burdwan Division Operational charges of PHED & NGO Managed Laboratories related to Water Quality Monitoring & Surveillance under Jal Jeevan Mission , SM/19071 Support-WQMSP Supply of Materials required for maintaining NABL Accreditation as per ISO:I 17025:2017 of Bardhaman District water testing Laboratory, PHED, Govt of West Bengal. Junior Engineer, R.W.S. Burdwan Sub Division, P.H.E. Dt ORD/000081/2024-2025 151/RWS 26/04/2024 7 BHARATI CHEMICAL AND SCIENTIFIC WORKS 0.79 0.00 0 100
5912 PURBA BARDHAMAN Burdwan Division Operational charges of PHED & NGO Managed Laboratories related to Water Quality Monitoring & Surveillance under Jal Jeevan Mission , SM/19071 Support-WQMSP Supply of Residual Chlorine Kit and engagement of Laboratory personnel (Chemist/Bacteriologist/ Lab Assistant and Sampling Assistant) including maintenance in 4 Nos. Sub District Laboratories within Kalna Sub Division under Burdwan Division, PHE Dte., Purba Bardhaman. [Period For Twelve Months] i.e. period from 01.08.2024 to 31.07.2025. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000372/2024-2025 2964/BWD 31/07/2024 365 DULAL MAJUMDER 40.12 0.00 0 2
5913 PURBA BARDHAMAN Burdwan Division Operational charges of PHED & NGO Managed Laboratories related to Water Quality Monitoring & Surveillance under Jal Jeevan Mission , SM/19071 Support-WQMSP Supply of Inverter Battery, MS Rack, office table and Plastic Chair for 14 Nos. laboratory under Burdwan Division, PHE. Dte. AE(HQs) J.E. 1 BURDWAN ORD/001033/2023-2024 102/AE/HQ 19/02/2024 30 SANDIPAN SENGUPTA 8.79 0.00 0 20
5914 PURBA BARDHAMAN Burdwan Division Operational charges of PHED & NGO Managed Laboratories related to Water Quality Monitoring & Surveillance under Jal Jeevan Mission , SM/19071 Support-WQMSP Remuneration of lab personnel for the month of June 2024. BILL/00556/2024-2025 747/JJM 29/08/2024 AIKYATAN DEVELOPMENT SOCIETY 0.45 0.00 0 null
5915 PURBA BARDHAMAN Burdwan Division Operational charges of PHED & NGO Managed Laboratories related to Water Quality Monitoring & Surveillance under Jal Jeevan Mission , SM/19071 Support-WQMSP Grant The Remuneration of Lab Staff for Month of June- 2024 BILL/00558/2024-2025 749/JJM 29/08/2024 DR CHATTERJEES VILLAGE WELFARE SOCIETY 0.45 0.00 0 null
5916 PURBA BARDHAMAN Burdwan Division Operational charges of PHED & NGO Managed Laboratories related to Water Quality Monitoring & Surveillance under Jal Jeevan Mission , SM/19071 Support-WQMSP Salary bill for the month of June 2024 BILL/00557/2024-2025 748/JJM 29/08/2024 SHASTRI SMRITI SANGHA 0.45 0.00 0 null
5917 PURBA BARDHAMAN Burdwan Division Operational charges of PHED & NGO Managed Laboratories related to Water Quality Monitoring & Surveillance under Jal Jeevan Mission , SM/19071 Support-WQMSP Continuation work for Engagement of 4 Nos Laboratory personnel (Analyst) at 4 Nos Water Testing Laboratories under Burdwan Division, PHE Dte [Period:One Month (01.04.24 to 30.04.24)] AE(HQs) J.E. 1 BURDWAN ORD/001216/2023-2024 234/AE/HQ 28/03/2024 30 DULAL MAJUMDER 0.87 0.00 0 100
5918 PURBA BARDHAMAN Burdwan Division Operational charges of PHED & NGO Managed Laboratories related to Water Quality Monitoring & Surveillance under Jal Jeevan Mission , SM/19071 Support-WQMSP Engagement of 1 No. Laboratory Assistant at Bonnabagram Water Testing Laboratories under Burdwan Division, PHE Dte [Period: For Four Months (01.03.24 to 30.06.24)] AE(HQs) J.E. 1 BURDWAN ORD/001223/2023-2024 131/AE/HQ 27/02/2024 120 DULAL MAJUMDER 0.63 0.00 0 100
5919 PURBA BARDHAMAN Burdwan Division Operational charges of PHED & NGO Managed Laboratories related to Water Quality Monitoring & Surveillance under Jal Jeevan Mission , SM/19071 Support-WQMSP Engagement of 4 Nos Laboratory personnel (Analyst) at 3 Nos Water Testing Laboratories under Burdwan Division, PHE Dte. [Period: For One Month (01.03.24 to 31.03.24)] AE(HQs) J.E. 1 BURDWAN ORD/001215/2023-2024 134/AE/HQ 28/02/2024 31 DULAL MAJUMDER 0.87 0.00 0 100
5920 PURBA BARDHAMAN Burdwan Division Operational charges of PHED & NGO Managed Laboratories related to Water Quality Monitoring & Surveillance under Jal Jeevan Mission , SM/19071 Support-WQMSP Continuation work for Engagement of 4 Nos Laboratory personnel (Analyst) at 3 Nos Water Testing Laboratories under Burdwan Division, PHE Dte. [Period: For One Month (01.04.24 to 30.04.24)] AE(HQs) J.E. 1 BURDWAN ORD/001217/2023-2024 235/AE/HQ 28/03/2024 30 DULAL MAJUMDER 0.87 0.00 0 100
5921 PURBA BARDHAMAN Burdwan Division Operational charges of PHED & NGO Managed Laboratories related to Water Quality Monitoring & Surveillance under Jal Jeevan Mission , SM/19071 Support-WQMSP Salary bill for the month of July 2024 BILL/00568/2024-2025 757/JJM 30/08/2024 SHASTRI SMRITI SANGHA 0.45 0.00 0 null
5922 PURBA BARDHAMAN Burdwan Division Operational charges of PHED & NGO Managed Laboratories related to Water Quality Monitoring & Surveillance under Jal Jeevan Mission , SM/19071 Support-WQMSP Grant the remuneration of lab staff for the month of July 2024 BILL/00566/2024-2025 757/JJM 30/08/2024 DR CHATTERJEES VILLAGE WELFARE SOCIETY 0.45 0.00 0 null
5923 PURBA BARDHAMAN Burdwan Division Operational charges of PHED & NGO Managed Laboratories related to Water Quality Monitoring & Surveillance under Jal Jeevan Mission , SM/19071 Support-WQMSP Monthly remuneration of lab personnel for the month of July 2024 BILL/00567/2024-2025 757/JJM 30/08/2024 AIKYATAN DEVELOPMENT SOCIETY 0.45 0.00 0 null
5924 PURBA BARDHAMAN Burdwan Division Operational charges of PHED & NGO Managed Laboratories related to Water Quality Monitoring & Surveillance under Jal Jeevan Mission , SM/19071 Support-WQMSP Engagement of 4 Nos Laboratory personnel (Analyst) at 4 Nos Water Testing Laboratories under Burdwan Division, PHE Dte [Period: One Month (01.03.24 to 31.03.24)] AE(HQs) J.E. 1 BURDWAN ORD/001214/2023-2024 133/AE/HQ 28/02/2024 31 DULAL MAJUMDER 0.87 0.00 0 100
5925 PURBA BARDHAMAN Burdwan Division Operational charges of PHED & NGO Managed Laboratories related to Water Quality Monitoring & Surveillance under Jal Jeevan Mission , SM/19071 Support-WQMSP Continuation work for Engagement of 4 Nos Laboratory personnel (Analyst) at 3 Nos Water Testing Laboratories under Burdwan Division, PHE Dte. [Period: For One Month (01.06.24 to 30.06.24)] AE(HQs) J.E. 1 BURDWAN ORD/000112/2024-2025 299/AE/HQ 30/05/2024 30 DULAL MAJUMDER 0.87 0.00 0 100
5926 PURBA BARDHAMAN Burdwan Division Operational charges of PHED & NGO Managed Laboratories related to Water Quality Monitoring & Surveillance under Jal Jeevan Mission , SM/19071 Support-WQMSP Continuation work for Engagement of 4 Nos Laboratory personnel (Analyst) at 4 Nos Water Testing Laboratories under Burdwan Division, PHE Dte [Period:One Month (01.05.24 to 31.05.24)] AE(HQs) J.E. 1 BURDWAN ORD/000109/2024-2025 275/AE/HQ 30/04/2024 31 DULAL MAJUMDER 0.87 0.00 0 100
5927 PURBA BARDHAMAN Burdwan Division Operational charges of PHED & NGO Managed Laboratories related to Water Quality Monitoring & Surveillance under Jal Jeevan Mission , SM/19071 Support-WQMSP Continuation work for Engagement of 4 Nos Laboratory personnel (Analyst) at 4 Nos Water Testing Laboratories under Burdwan Division, PHE Dte [Period:One Month (01.06.24 to 30.06.24)] AE(HQs) J.E. 1 BURDWAN ORD/000111/2024-2025 298/AE/HQ 30/05/2024 30 DULAL MAJUMDER 0.87 0.00 0 100
5928 PURBA BARDHAMAN Burdwan Division Operational charges of PHED & NGO Managed Laboratories related to Water Quality Monitoring & Surveillance under Jal Jeevan Mission , SM/19071 Support-WQMSP Continuation work for Engagement of 4 Nos Laboratory personnel (Analyst) at 3 Nos Water Testing Laboratories under Burdwan Division, PHE Dte. [Period: For One Month (01.05.24 to 31.05.24)] AE(HQs) J.E. 1 BURDWAN ORD/000110/2024-2025 276/AE/HQ 30/04/2024 31 DULAL MAJUMDER 0.87 0.00 0 100
5929 PURBA BARDHAMAN Burdwan Division Operational charges of PHED & NGO Managed Laboratories related to Water Quality Monitoring & Surveillance under Jal Jeevan Mission , SM/19071 Support-WQMSP Remuneration of lab personnel for the month of August2024 BILL/00676/2024-2025 857/JJM 20/09/2024 AIKYATAN DEVELOPMENT SOCIETY 0.45 0.00 0 null
5930 PURBA BARDHAMAN Burdwan Division Operational charges of PHED & NGO Managed Laboratories related to Water Quality Monitoring & Surveillance under Jal Jeevan Mission , SM/19071 Support-WQMSP Grant the remuneration of lab staff for the month of August-2024 BILL/00677/2024-2025 856/JJM 20/09/2024 DR CHATTERJEES VILLAGE WELFARE SOCIETY 0.45 0.00 0 null
5931 PURBA BARDHAMAN Burdwan Division Operational charges of PHED & NGO Managed Laboratories related to Water Quality Monitoring & Surveillance under Jal Jeevan Mission , SM/19071 Support-WQMSP Salary Bill for the month of August- 2024 BILL/00675/2024-2025 858/JJM 20/09/2024 SHASTRI SMRITI SANGHA 0.45 0.00 0 null
5932 PURBA BARDHAMAN Burdwan Division Operational charges of PHED & NGO Managed Laboratories related to Water Quality Monitoring & Surveillance under Jal Jeevan Mission , SM/19071 Support-WQMSP Continuation work for Engagement of Laboratory personnel (Chemist/Bacteriologist and Lab Assistant) including maintenance in 4 Nos. Sub District Laboratories within Kalna Sub Division under Burdwan Division, PHE Dte., Purba Bardhaman. [Period from 01.06.2024 to 31.07.2024] Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000433/2024-2025 2007/BWD 30/05/2024 60 DULAL MAJUMDER 5.04 2.52 50 100
5933 PURBA BARDHAMAN Burdwan Division Operational charges of PHED & NGO Managed Laboratories related to Water Quality Monitoring & Surveillance under Jal Jeevan Mission , SM/19071 Support-WQMSP Grant The Festival Bonus For Laboratory personnel BILL/00900/2024-2025 1034/JJM 25/10/2024 DR CHATTERJEES VILLAGE WELFARE SOCIETY 0.18 0.00 0 null
5934 PURBA BARDHAMAN Burdwan Division Operational charges of PHED & NGO Managed Laboratories related to Water Quality Monitoring & Surveillance under Jal Jeevan Mission , SM/19071 Support-WQMSP Festival Bonus of lab personnel BILL/00898/2024-2025 1032/JJM 25/10/2024 AIKYATAN DEVELOPMENT SOCIETY 0.18 0.00 0 null
5935 PURBA BARDHAMAN Burdwan Division Operational charges of PHED & NGO Managed Laboratories related to Water Quality Monitoring & Surveillance under Jal Jeevan Mission , SM/19071 Support-WQMSP Festival Bonus For The Lab Personnel BILL/00899/2024-2025 1033/JJM 25/10/2024 SHASTRI SMRITI SANGHA 0.18 0.00 0 null
5936 PURBA BARDHAMAN Burdwan Division Operational charges of PHED & NGO Managed Laboratories related to Water Quality Monitoring & Surveillance under Jal Jeevan Mission , SM/19071 Support-WQMSP Grant The Remuneration of Lab Staff For The Month Of September-2024 BILL/00904/2024-2025 1045/JJM 30/10/2024 DR CHATTERJEES VILLAGE WELFARE SOCIETY 0.45 0.00 0 null
5937 PURBA BARDHAMAN Burdwan Division Operational charges of PHED & NGO Managed Laboratories related to Water Quality Monitoring & Surveillance under Jal Jeevan Mission , SM/19071 Support-WQMSP Salary Bill For The Month Of September 2024 BILL/00906/2024-2025 1043/JJM 30/10/2024 SHASTRI SMRITI SANGHA 0.45 0.00 0 null
5938 PURBA BARDHAMAN Burdwan Division Operational charges of PHED & NGO Managed Laboratories related to Water Quality Monitoring & Surveillance under Jal Jeevan Mission , SM/19071 Support-WQMSP Monthly Remuneration Of Lab Personnel For The Month Of September 2024 BILL/00905/2024-2025 1044/JJM 30/10/2024 AIKYATAN DEVELOPMENT SOCIETY 0.45 0.00 0 null
5939 PURBA BARDHAMAN Burdwan Division Operational charges of PHED & NGO Managed Laboratories related to Water Quality Monitoring & Surveillance under Jal Jeevan Mission , SM/19071 Support-WQMSP MAINTENANCE CHARGE FOR THE MONTH OF JANUARY 2024 TO JUNE 2024(6 MONTH) BILL/00951/2024-2025 1049/JJM 05/11/2024 SHASTRI SMRITI SANGHA 0.40 0.00 0 null
5940 PURBA BARDHAMAN Burdwan Division Operational charges of PHED & NGO Managed Laboratories related to Water Quality Monitoring & Surveillance under Jal Jeevan Mission , SM/19071 Support-WQMSP LABORATORY MAINTENANCE BILL FOR JANUARY TO JUNE 2024 BILL/00952/2024-2025 1050/JJM 05/11/2024 DR CHATTERJEES VILLAGE WELFARE SOCIETY 0.40 0.00 0 null
5941 PURBA BARDHAMAN Burdwan Division Operational charges of PHED & NGO Managed Laboratories related to Water Quality Monitoring & Surveillance under Jal Jeevan Mission , SM/19071 Support-WQMSP Continuation work order for Annual Maintenance Contract (AMC) for software upgradation and other software related issues in existing computers, refilling of Cartridge of the printers, replacement of battery of UPS in District, Sub-Dist. and NGO Laboratories under Burdwan Division, P.H.E. Dte. [Period from 01.02.2024 to 31.07.2024] AE(HQs) J.E. 1 BURDWAN ORD/001018/2023-2024 46/AE/HQ 29/01/2024 180 COMPUTER MEDIA 0.99 0.99 100 100
5942 PURBA BARDHAMAN Burdwan Division Operational charges of PHED & NGO Managed Laboratories related to Water Quality Monitoring & Surveillance under Jal Jeevan Mission , SM/19071 Support-WQMSP Supply of Residual Chlorine Kit, Iron Test Kit and Sample Collection Bottle for Burdwan District Laboratory under Burdwan Division, PHE Dte., Purba Bardhaman. AE(HQs) J.E. 1 BURDWAN ORD/000697/2024-2025 863/AE/HQ 24/10/2024 15 ALAKA GHOSH 1.00 0.00 0 100
5943 PURBA BARDHAMAN Burdwan Division Operational charges of PHED & NGO Managed Laboratories related to Water Quality Monitoring & Surveillance under Jal Jeevan Mission , SM/19071 Support-WQMSP Salary Bill for the month of October-2024 BILL/01006/2024-2025 1088/JJM 29/11/2024 SHASTRI SMRITI SANGHA 0.45 0.00 0 null
5944 PURBA BARDHAMAN Burdwan Division Operational charges of PHED & NGO Managed Laboratories related to Water Quality Monitoring & Surveillance under Jal Jeevan Mission , SM/19071 Support-WQMSP Monthly remuneration for the month of October 2024 BILL/01004/2024-2025 1087/JJM 29/11/2024 AIKYATAN DEVELOPMENT SOCIETY 0.45 0.00 0 null
5945 PURBA BARDHAMAN Burdwan Division Operational charges of PHED & NGO Managed Laboratories related to Water Quality Monitoring & Surveillance under Jal Jeevan Mission , SM/19071 Support-WQMSP Grant The Remuneration Of Lab Staff For The Month Of October-2024. BILL/01005/2024-2025 1086/JJM 29/11/2024 DR CHATTERJEES VILLAGE WELFARE SOCIETY 0.45 0.00 0 null
5946 PURBA BARDHAMAN Burdwan Division Operational charges of PHED & NGO Managed Laboratories related to Water Quality Monitoring & Surveillance under Jal Jeevan Mission , SM/19071 Support-WQMSP Continuation work for Engagement of laboratory personnels i.e. Chemist (One Person), Additional Chemist (One person), Bacteriologist (One Person), Laboratory Assistant (One Person), Sampling Assistant (One Person) and Computer Operator/Data Entry Operator (One Person) for Burdwan District Laboratory under Burdwan Division P.H.E Dte. at PHE Complex, Nababhat, Purba Bardhaman. [Period for 6 (Six) Months i.e. 01.06.2024 to 30.11.2024] ASSISTANT ENGINEER R.W.S. BURDWAN SUB-DIVISION PHE DTE Contractual Junior Engineer ORD/000577/2024-2025 1997/BWD 30/05/2024 180 ALAKA GHOSH 7.67 1.92 25.03 100
5947 PURBA BARDHAMAN Burdwan Division Operational charges of PHED & NGO Managed Laboratories related to Water Quality Monitoring & Surveillance under Jal Jeevan Mission , SM/19071 Support-WQMSP Salary Bill For The Month Of November-2024 BILL/01093/2024-2025 1174/JJM 17/12/2024 SHASTRI SMRITI SANGHA 0.45 0.00 0 null
5948 PURBA BARDHAMAN Burdwan Division Operational charges of PHED & NGO Managed Laboratories related to Water Quality Monitoring & Surveillance under Jal Jeevan Mission , SM/19071 Support-WQMSP Monthly Remuneration Of Lab Personnel For The Month of November-2024 BILL/01094/2024-2025 1176/JJM 17/12/2024 AIKYATAN DEVELOPMENT SOCIETY 0.45 0.00 0 null
5949 PURBA BARDHAMAN Burdwan Division Operational charges of PHED & NGO Managed Laboratories related to Water Quality Monitoring & Surveillance under Jal Jeevan Mission , SM/19071 Support-WQMSP Grant The Remuneration Of Lab Staff For The Month Of November-2024 BILL/01095/2024-2025 1175/JJM 17/12/2024 DR CHATTERJEES VILLAGE WELFARE SOCIETY 0.45 0.00 0 null
5950 PURBA BARDHAMAN Burdwan Division Operational charges of PHED & NGO Managed Laboratories related to Water Quality Monitoring & Surveillance under Jal Jeevan Mission , SM/19071 Support-WQMSP Payment of festival bonus for 6 (six) nos Laboratory Staff of Burdwan District Laboratory under Burdwan Division P.H.E Dte. at PHE Complex, Nababhat, Purba Bardhaman. ASSISTANT ENGINEER R.W.S. BURDWAN SUB-DIVISION PHE DTE Contractual Junior Engineer ORD/000979/2024-2025 403/RWS 12/12/2024 3 ALAKA GHOSH 0.47 0.00 0 100
5951 PURBA BARDHAMAN Burdwan Division Operational charges of PHED & NGO Managed Laboratories related to Water Quality Monitoring & Surveillance under Jal Jeevan Mission , SM/19071 Support-WQMSP Salary Bill For The Month Of December 2024 BILL/01235/2024-2025 1259/JJM 24/01/2025 SHASTRI SMRITI SANGHA 0.45 0.00 0 null
5952 PURBA BARDHAMAN Burdwan Division Operational charges of PHED & NGO Managed Laboratories related to Water Quality Monitoring & Surveillance under Jal Jeevan Mission , SM/19071 Support-WQMSP Monthly Remuneration of lab Personnel For The Month of December 2024 BILL/01234/2024-2025 1258/JJM 24/01/2025 AIKYATAN DEVELOPMENT SOCIETY 0.45 0.00 0 null
5953 PURBA BARDHAMAN Burdwan Division Operational charges of PHED & NGO Managed Laboratories related to Water Quality Monitoring & Surveillance under Jal Jeevan Mission , SM/19071 Support-WQMSP Supply of Residual Chlorine Kit and engagement of Laboratory personnel (Chemist/Bacteriologist/ Lab Assistant and Sampling Assistant) including maintenance in 3 Nos. Sub District Laboratories within Headquarters under Burdwan Division, PHE Dte., Purba Bardhaman. [Period For Twelve Months] i.e. period from 01.08.2024 to 31.07.2025. AE(HQs) J.E. 1 BURDWAN ORD/000369/2024-2025 2961/BWD 31/07/2024 365 BHARATI CHEMICAL AND SCIENTIFIC WORKS 29.46 0.00 0 50
5954 PURBA BARDHAMAN Burdwan Division Operational charges of PHED & NGO Managed Laboratories related to Water Quality Monitoring & Surveillance under Jal Jeevan Mission , SM/19071 Support-WQMSP Engagement of Laboratory personnel (Chemist/Bacteriologist/ Lab Assistant in 1 No. Ketugram Sub District Water Testing Laboratory within Katwa sub Division under Burdwan Division, PHE Dte., Purba Bardhaman. [Period For 01.03.2025 to 31.07.2025] (Sl No-01) Assistant Engineer JUNIOR ENGINEER KATWA SUB-DIVISION PHE DTE ORD/001241/2024-2025 318/KTS 28/02/2025 150 JAGADHATRI CONSTRUCTION AND BUILDERS 2.94 0.00 0 0
5955 PURBA BARDHAMAN Burdwan Division Operational charges of PHED & NGO Managed Laboratories related to Water Quality Monitoring & Surveillance under Jal Jeevan Mission , SM/19071 Support-WQMSP Supply, fitting, fixing of different computer spare parts of District Lab (1no.), Sub-Dist. Lab (11Nos.) (Barshul SDWTL, Satgachia SDWTL, Monteswar SDWTL, Sankari SDWTL, Anukhal SDWTL, Saktigarh SDWTL, Parulia SDWTL, Ganganandapur SDWTL, Sehera SDWTL, Bonnobogram SDWTL, Ketugram SDWTL) and NGO Lab (2Nos.) (Shastri Smriti Sangha & Aikyatan Development Society) under Burdwan Division, PHE. Dte. J.E. 1 BURDWAN ORD/001272/2024-2025 167/AE/HQ 31/01/2025 30 COMPUTER MEDIA 0.94 0.00 0 0
5956 PURBA BARDHAMAN Burdwan Division Operational charges of PHED & NGO Managed Laboratories related to Water Quality Monitoring & Surveillance under Jal Jeevan Mission , SM/19071 Support-WQMSP Annual Maintenance Contract (AMC) for software upgradation and other software related issues in existing computers, refilling of Cartridge of the printers, replacement of battery of UPS in District Lab (1No.), Sub-Dist. Lab (11Nos.) (Barshul SDWTL, Satgachia SDWTL, Monteswar SDWTL, Sankari SDWTL, Anukhal SDWTL, Saktigarh SDWTL, Parulia SDWTL, Ganganandapur SDWTL, Sehera SDWTL, Bonnobogram SDWTL, Ketugram SDWTL) and NGO Lab (2Nos.) (Shastri Smriti Sangha&Aikyatan Development Society) under Burdwan Division, P.H.E. Dte. [Period from 01.02.2025 to 31.07.2025 i.e. Six Months] J.E. 1 BURDWAN ORD/001271/2024-2025 166/AE/HQ 31/01/2025 180 COMPUTER MEDIA 0.99 0.00 0 0
5957 PURBA BARDHAMAN Burdwan Division Operational charges of PHED & NGO Managed Laboratories related to Water Quality Monitoring & Surveillance under Jal Jeevan Mission , SM/19071 Support-WQMSP Engagement of Laboratory personnel (Chemist/Bacteriologist/ Lab Assistant in 1 No. Ketugram Sub District Water Testing Laboratory within Katwa sub Division under Burdwan Division, PHE Dte., Purba Bardhaman. [Period For 01 Months] Assistant Engineer JUNIOR ENGINEER KATWA SUB-DIVISION PHE DTE ORD/001054/2024-2025 1660/KTS 26/11/2024 30 JAGADHATRI CONSTRUCTION AND BUILDERS 0.59 0.59 100 100
5958 PURBA BARDHAMAN Burdwan Division Operational charges of PHED & NGO Managed Laboratories related to Water Quality Monitoring & Surveillance under Jal Jeevan Mission , SM/19071 Support-WQMSP Continuation work for Engagement of 4 Nos Laboratory personnel (Analyst) at 3 Nos Water Testing Laboratories under Burdwan Division, PHE Dte. [Period: For One Month (01.07.24 to 31.07.24)] AE(HQs) J.E. 1 BURDWAN ORD/000476/2024-2025 374/AE/HQ 01/07/2024 31 DULAL MAJUMDER 0.87 0.00 0 100
5959 PURBA BARDHAMAN Burdwan Division Operational charges of PHED & NGO Managed Laboratories related to Water Quality Monitoring & Surveillance under Jal Jeevan Mission , SM/19071 Support-WQMSP Continuation work for Engagement of Laboratory personnel (Sampling Assistant) in Bananabagram Sub District Laboratory within Headquarters under Burdwan Division, PHE Dte., Purba Bardhaman. [Period for 01.06.2024 to 31.07.2024]. AE(HQs) J.E. 1 BURDWAN ORD/000430/2024-2025 303/AE/HQ 31/05/2024 60 DULAL MAJUMDER 0.25 0.00 0 100
5960 PURBA BARDHAMAN Burdwan Division Operational charges of PHED & NGO Managed Laboratories related to Water Quality Monitoring & Surveillance under Jal Jeevan Mission , SM/19071 Support-WQMSP Continuation work for Engagement of Laboratory personnel (Chemist/Bacteriologist and Lab Assistant) including maintenance in 3 Nos. Sub District Laboratories within Headquarters under Burdwan Division, PHE Dte., Purba Bardhaman. [Period from 01.06.2024 to 31.07.2024] AE(HQs) J.E. 1 BURDWAN ORD/000431/2024-2025 1980/BWD 29/05/2024 60 DULAL MAJUMDER 3.56 0.00 0 100
5961 PURBA BARDHAMAN Burdwan Division Operational charges of PHED & NGO Managed Laboratories related to Water Quality Monitoring & Surveillance under Jal Jeevan Mission , SM/19071 Support-WQMSP Continuation work for Engagement of 4 Nos Laboratory personnel (Analyst) at 4 Nos Water Testing Laboratories under Burdwan Division, PHE Dte [Period:One Month (01.07.24 to 31.07.24)] AE(HQs) J.E. 1 BURDWAN ORD/000475/2024-2025 373/AE/HQ 01/07/2024 31 DULAL MAJUMDER 0.87 0.00 0 100
5962 PURBA BARDHAMAN Burdwan Division Operational charges of PHED & NGO Managed Laboratories related to Water Quality Monitoring & Surveillance under Jal Jeevan Mission , SM/19071 Support-WQMSP Continuation Work Order for Engagement of 1 No. Laboratory Assistant at Bonnabagram Water Testing Laboratories under Burdwan Division, PHE Dte [Period: For Four Months (01.07.24 to 31.07.24)] AE(HQs) J.E. 1 BURDWAN ORD/000477/2024-2025 375/AE/HQ 01/07/2024 31 DULAL MAJUMDER 0.16 0.00 0 100
5963 PURBA BARDHAMAN Burdwan Division Operational charges of PHED & NGO Managed Laboratories related to Water Quality Monitoring & Surveillance under Jal Jeevan Mission , SM/19071 Support-WQMSP Supply & Delivery of Chemicals, reagents and consumables for 14(Fourteen) laboratories under Burdwan Division, P.H.E. Dte. AE(HQs) J.E. 1 BURDWAN ORD/000710/2024-2025 3712/BWD 28/10/2024 30 BHARATI CHEMICAL AND SCIENTIFIC WORKS 39.74 39.74 100 100
5964 PURBA BARDHAMAN Burdwan Division Operational charges of PHED & NGO Managed Laboratories related to Water Quality Monitoring & Surveillance under Jal Jeevan Mission , SM/19071 Support-WQMSP Monthly remuneration of lab personnel for the month of January 2025 BILL/01365/2024-2025 1514/JJM 17/03/2025 SHASTRI SMRITI SANGHA 0.45 0.00 0 null
5965 PURBA BARDHAMAN Burdwan Division Operational charges of PHED & NGO Managed Laboratories related to Water Quality Monitoring & Surveillance under Jal Jeevan Mission , SM/19071 Support-WQMSP Maintenance charge for themonth of July24 to December24. BILL/01385/2024-2025 1516/JJM 17/03/2025 SHASTRI SMRITI SANGHA 0.35 0.00 0 null
5966 PURBA BARDHAMAN Burdwan Division Operational charges of PHED & NGO Managed Laboratories related to Water Quality Monitoring & Surveillance under Jal Jeevan Mission , SM/19071 Support-WQMSP LABORATORY MAINTENANCE JULY TO NOVEMBER 2024 BILL/01389/2024-2025 1515/JJM 17/03/2025 DR CHATTERJEES VILLAGE WELFARE SOCIETY 0.35 0.00 0 null
5967 PURBA BARDHAMAN Burdwan Division Operational charges of PHED & NGO Managed Laboratories related to Water Quality Monitoring & Surveillance under Jal Jeevan Mission , SM/19071 Support-WQMSP Monthly remuneration of lab personnel for the month of January 2025 BILL/01364/2024-2025 1513/JJM 17/03/2025 AIKYATAN DEVELOPMENT SOCIETY 0.45 0.00 0 null
5968 PURBA BARDHAMAN Burdwan Division Operational charges of PHED & NGO Managed Laboratories related to Water Quality Monitoring & Surveillance under Jal Jeevan Mission , SM/19071 Support-WQMSP Continuation work for Engagement of laboratory personnels i.e. Chemist (One Person), Additional Chemist (One person), Bacteriologist (One Person), Laboratory Assistant (One Person), Sampling Assistant (One Person) and Computer Operator/Data Entry Operator (One Person) for Burdwan District Laboratory under Burdwan Division P.H.E Dte. at PHE Complex, Nababhat, Purba Bardhaman. [Period for 6 (Six) Months i.e. 01.12.2024 to 31.05.2025] ASSISTANT ENGINEER R.W.S. BURDWAN SUB-DIVISION PHE DTE Contractual Junior Engineer ORD/001235/2024-2025 4167-A/BWD 29/11/2024 180 ALAKA GHOSH 7.67 0.00 0 50
5969 PURBA BARDHAMAN Burdwan Division Operational charges of PHED & NGO Managed Laboratories related to Water Quality Monitoring & Surveillance under Jal Jeevan Mission , SM/19071 Support-WQMSP Monthly remuneration of lab personnel for the month of February 2025 BILL/01482/2024-2025 1716/JJM 29/03/2025 SHASTRI SMRITI SANGHA 0.45 0.00 0 null
5970 PURBA BARDHAMAN Burdwan Division Operational charges of PHED & NGO Managed Laboratories related to Water Quality Monitoring & Surveillance under Jal Jeevan Mission , SM/19071 Support-WQMSP Monthly remuneration of lab personnel for the month of February 2025. BILL/01481/2024-2025 1715/JJM 29/03/2025 AIKYATAN DEVELOPMENT SOCIETY 0.45 0.00 0 null
5971 PURBA BARDHAMAN Burdwan Division Operational charges of PHED & NGO Managed Laboratories related to Water Quality Monitoring & Surveillance under Jal Jeevan Mission , SM/19071 Support-WQMSP Continuation work for Engagement of Laboratory personnel (Chemist/Bacteriologist and Lab Assistant) including maintenance in 2 Nos. Sub District Laboratories within Burdwan Sadar Sub Division under Burdwan Division, PHE Dte., Purba Bardhaman. [Period from 01.06.2024 to 31.07.2024] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000432/2024-2025 1981/BWD 28/05/2024 60 DULAL MAJUMDER 1.98 0.00 0 100
5972 PURBA BARDHAMAN Burdwan Division Operational charges of PHED & NGO Managed Laboratories related to Water Quality Monitoring & Surveillance under Jal Jeevan Mission , SM/19071 Support-WQMSP Continuation work order for Engagement of Laboratory personnel (Chemist/Bacteriologist/ Lab Assistant in 1 No. Ketugram Sub District Water Testing Laboratory within Katwa sub Division under Burdwan Division, PHE Dte., Purba Bardhaman. [Period For 01.01.2025 to 31.01.2025] [Sl No -01] Assistant Engineer JUNIOR ENGINEER KATWA SUB-DIVISION PHE DTE ORD/001194/2024-2025 1812/KTS 31/12/2024 30 JAGADHATRI CONSTRUCTION AND BUILDERS 0.59 0.00 0 100
5973 PURBA BARDHAMAN Burdwan Division Operational charges of PHED & NGO Managed Laboratories related to Water Quality Monitoring & Surveillance under Jal Jeevan Mission , SM/19071 Support-WQMSP Continuation work Order for Engagement of Laboratory personnel (Chemist/Bacteriologist/ Lab Assistant in 1 No. Ketugram Sub District Water Testing Laboratory within Katwa sub Division under Burdwan Division, PHE Dte., Purba Bardhaman. [Period For 01.02.2025 to 28.02.2025] [Sl No -1] Assistant Engineer JUNIOR ENGINEER KATWA SUB-DIVISION PHE DTE ORD/001196/2024-2025 147/KTS 30/01/2025 30 JAGADHATRI CONSTRUCTION AND BUILDERS 0.59 0.00 0 100
5974 PURBA BARDHAMAN Burdwan Division Operational charges of PHED & NGO Managed Laboratories related to Water Quality Monitoring & Surveillance under Jal Jeevan Mission , SM/19071 Support-WQMSP Arrear salary (From January'23 to August'23) for the laboratory personnel (Bacteriologist, Laboratory Assistant) of Bonnabagram Subdivision laboratory under Durgapur Division PHE Dte. Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer2, Durgapur Sub-Division, PHE Dte. ORD/000688/2023-2024 899/DSD 13/12/2023 15 CLIFFORD FACILITY SERVICES PVT.LTD. 0.66 0.00 0 100
5975 PURBA BARDHAMAN Burdwan Division Operational charges of PHED & NGO Managed Laboratories related to Water Quality Monitoring & Surveillance under Jal Jeevan Mission , SM/19071 Support-WQMSP Salary bill (from January 2024 to February 2024) for the laboratory personnel (Bacteriologist, Laboratory Assistant) of Bonnabagrum Sub-Division laboratory under Durgapur Sub-Division, P.H.E. DTE. Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer1, Durgapur Sub-Division, PHE Dte. ORD/001274/2023-2024 994/DSD 29/12/2023 65 CLIFFORD FACILITY SERVICES PVT.LTD. 0.63 0.00 0 100
5976 PURBA BARDHAMAN Burdwan Division Operational charges of PHED & NGO Managed Laboratories related to Water Quality Monitoring & Surveillance under Jal Jeevan Mission , SM/19071 Support-WQMSP Monthly Remuneration Of Lab Personnel For The Month Of March 2025. BILL/00072/2025-2026 null 21/04/2025 SHASTRI SMRITI SANGHA 0.45 0.00 0 null
5977 PURBA BARDHAMAN Burdwan Division Operational charges of PHED & NGO Managed Laboratories related to Water Quality Monitoring & Surveillance under Jal Jeevan Mission , SM/19071 Support-WQMSP Monthly Remuneration of Lab personnel For The Month of March 2025 BILL/00073/2025-2026 null 21/04/2025 AIKYATAN DEVELOPMENT SOCIETY 0.45 0.00 0 null
5978 PURBA BARDHAMAN Burdwan Division Drinking water sample collection & testing through Filed Test Kits (FTKs) & uploading charges for the same related to Water Quality Monitoring & Surveillance Programme. , SM/08993 Support-WQMSP Transfer of fund for Field Test Kit (FTK) programme to CMOH, Purba Bardhaman. VCH/000288/2022-2023 null 01/08/2022 DISTRICT HEALTH & FAMILY WELFARE SAMITY 25.80 0.00 0 0
5979 PURBA BARDHAMAN Burdwan Division Drinking water sample collection & testing through Filed Test Kits (FTKs) & uploading charges for the same related to Water Quality Monitoring & Surveillance Programme. , SM/08993 Support-WQMSP Transfer of fund for Field Test Kit (FTK) programme to CMOH, Purba Bardhaman. VCH/000488/2022-2023 392/FTK/22-23 05/08/2022 DISTRICT HEALTH & FAMILY WELFARE SAMITY 20.00 0.00 0 0
5980 PURBA BARDHAMAN Burdwan Division Drinking water sample collection & testing through Filed Test Kits (FTKs) & uploading charges for the same related to Water Quality Monitoring & Surveillance Programme. , SM/08993 Support-WQMSP Supply and delivery of portable multi-parameter water quality testing device including training on operation of the device in addition to online entry, management, analysis and reporting of water quality test results in State Water Quality Dashboard and IMIS both for monitoring water safety status of rural drinking water sources of 138 Nos. Gram Panchayats in Purba Bardhaman District of West Bengal under PHE Department. ........ [Excluding Sl. No. 03 in the B.O.Q.] ORD/000364/2021-2022 119/BWD 07/01/2022 60 SUNANDA ENVIROMENTAL INTERNATIONAL PVT LTD. 20.46 6.57 32.11 0
5981 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Engagement of laboratory personnels i.e. Chemist (One Person), Bacteriologist (One Person), Laboratory Assistant (One Person) , Sampling Assistant (One Person) and Computer Operator/Data Entry Operator (One Person) for Burdwan District Laboratory under Burdwan Division P.H.E Dte. at PHE Complex, Nababhat, Purba Bardhaman For the period from 01.03.2022 to 31.08.2022.Gr.C. ORD/000646/2021-2022 360/BSD 28/02/2022 6 ALAKA GHOSH 4.69 4.69 100 0
5982 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Engagement of resource person to operate AAS at District Laboratory under Burdwan Division, PHE. Dte. [Period from 16.11.2021 to 15.05.2022]_Gr-A ORD/000675/2021-2022 1903/AE/HQ 16/11/2021 180 ALAKA GHOSH 0.79 0.79 100 0
5983 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Providing service by assigning resource person for a period of 03 Months supervision of process of preparation for NABL recognition for Chemical Testing of portable water of Sub-District Level water quality laboratory including supply, installation of a requisites for NABL recognition through NABL GLAP application for 11 mandatory parameters and training on procedures with documentation thereof for SANKARI Sub-District water Testing Laboratory under Burdwan Division, PHE Dte.[Gr.-A] AE(HQs) J.E. 2 BURDWAN ORD/000809/2021-2022 1724/AE/HQ 25/08/2021 15 NATURAL RESOURCES CONSORTIUM 4.83 4.83 100 0
5984 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Providing service by assigning resource person for a period of 03 Months supervision of process of preparation for NABL recognition for Chemical Testing of portable water of Sub-District Level water quality laboratory including supply, installation of a requisites for NABL recognition through NABL GLAP application for 11 mandatory parameters and training on procedures with documentation thereof for SHAKTIGARH Sub-District water Testing Laboratory under Burdwan Division, PHE Dte.[Gr.-B] AE(HQs) J.E. 2 BURDWAN ORD/000810/2021-2022 1723/AE/HQ 25/08/2021 15 NATURAL RESOURCES CONSORTIUM 4.83 4.83 100 0
5985 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Proposed extension, renovation and modification for NABL accreditation of SANKARI Sub District Laboratory under Burdwan Division P.H.E. Dte. Dist:Purba Bardhaman._2ND CALL. ORD/000161/2021-2022 4930/BWD 28/09/2021 45 KAJAL MUKHERJEE 5.84 5.94 101.71 0
5986 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Engagement of Laboratory personnel (Chemist/Bacteriologist and Lab Assistant)in 2 Sub District Laboratories within Burdwan Sub-Division under Burdwan Division, P.H.E. Dte., Purba Bardhaman for the period from 01-01-2022 to 30-06-2022¿.Gr.C. ORD/000413/2021-2022 1799/BSD 31/12/2021 180 CLIFFORD FACILITY SERVICES PVT.LTD. 3.14 2.09 66.56 0
5987 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Continuation work order for engagement of laboratory personnel (Sampling Assistant) in 7 Nos. Sub-District Laboratories under Burdwan Division, PHE Dte. [Period from 01/01/2022 to 30/06/2022] AE(HQs) J.E. 2 BURDWAN ORD/000812/2021-2022 1961/AE/HQ 28/12/2021 180 COMPUTER MEDIA 4.69 4.69 100 0
5988 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Providing service by assigning Resource person for a period of 3 months supervision of process of preparation for NABL recognition for Chemical Testing of potable water of Sub-District Level Water Quality Testing Laboratory including supply, installation of a requisites for NABL recognition through NABL GLAP application for 11 mandatory parameters and training on procedures with documentation thereof for ANUKHAL Sub-District Water Testing Laboratory under Burdwan Divn., PHE. Dte. [Group : D] AE(HQs) J.E. 2 BURDWAN ORD/000817/2021-2022 1726/AE/HQ 25/08/2021 90 LAXMI ENTERPRISE 4.83 4.83 100 0
5989 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Providing service by assigning Resource person for a period of 3 months supervision of process of preparation for NABL recognition for Chemical Testing of potable water of Sub-District Level Water Quality Testing Laboratory including supply, installation of a requisites for NABL recognition through NABL GLAP application for 11 mandatory parameters and training on procedures with documentation thereof for BANNABAGRAM Sub-District Water Testing Laboratory under Burdwan Divn., PHE. Dte. [Group : F] AE(HQs) J.E. 2 BURDWAN ORD/000818/2021-2022 1721/AE/HQ 25/08/2021 90 LAXMI ENTERPRISE 4.83 4.83 100 0
5990 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Continuation Work Order for Supply & delivery of Chemicals for Arsenic test through AAS at District Laboratories under Burdwan Division PHE Dte. [Group : A] AE(HQs) J.E. 2 BURDWAN ORD/000063/2022-2023 275/AE/HQ 10/05/2022 7 BHARATI CHEMICAL & SCIENTIFIC WORKS 3.09 0.00 0 0
5991 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Supply & delivery of Chemicals for Arsenic test through AAS at District Laboratories under Burdwan Division PHE Dte. AE(HQs) J.E. 2 BURDWAN ORD/000834/2021-2022 1578/AE/HQ 14/07/2021 7 BHARATI CHEMICAL & SCIENTIFIC WORKS 3.09 2.57 83.17 0
5992 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Continuation work order for Engagement of Laboratory personnel (Chemist/Bacteriologist and Lab Assistant) in 1 No. Sub District Laboratory within Durgapur Sub Division under Burdwan Division, PHE Dte., Purba Bardhaman. [Period 01/01/2022 to 30/04/2022] Junior Engineer1, Durgapur Sub-Division, PHE Dte. ORD/000435/2021-2022 726/DSD 22/12/2021 120 CLIFFORD FACILITY SERVICES PVT.LTD. 1.13 0.26 23.01 0
5993 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Salary of NGO Lab Personnel (Chemist/Bacteriologist and Lab Assistant) For the month of April May & June'2022 under Burdwan division, PHE Dte. VCH/000461/2022-2023 516/LAB/22-23 06/09/2022 SIDHU KANU GRAM UNNAYAN SAMITI 0.99 0.00 0 0
5994 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Salary of NGO Lab Personnel (Chemist/Bacteriologist and Lab Assistant) For the month of April May & June'2022 under Burdwan division, PHE Dte. VCH/000463/2022-2023 515/LAB/22-23 06/09/2022 AIKYATAN DEVELOPMENT SOCIETY 0.99 0.00 0 0
5995 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Salary of NGO Lab Personnel (Chemist/Bacteriologist and Lab Assistant) For the month of April May & June'2022 under Burdwan division, PHE Dte. VCH/000464/2022-2023 519/LAB/22-23 06/09/2022 SHASTRI SMRITI SANGHA 0.90 0.00 0 0
5996 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Salary of NGO Lab Personnel (Chemist/Bacteriologist and Lab Assistant) For the month of April May & June'2022 under Burdwan division, PHE Dte. VCH/000462/2022-2023 517/LAB/22-23 06/09/2022 DR CHATTERJEES VILLAGE WELFARE SOCIETY 0.99 0.00 0 0
5997 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Salary of NGO Lab Personnel (Chemist/Bacteriologist and Lab Assistant) For the month of April May & June'2022 under Burdwan division, PHE Dte. VCH/000465/2022-2023 518/LAB/22-23 06/09/2022 SIKSHA-NIKATAN 0.75 0.00 0 0
5998 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Salary bill of NGO Laboratory personnel (Chemist/Bacteriologist and Lab Assistant) under Burdwan Division, PHE Dte. for the month of July'2022. VCH/000512/2022-2023 719/LAB/22-23 28/10/2022 SIDHU KANU GRAM UNNAYAN SAMITI 0.33 0.00 0 0
5999 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Salary bill of NGO Laboratory personnel (Chemist/Bacteriologist and Lab Assistant) under Burdwan Division, PHE Dte. for the month of July'2022. VCH/000510/2022-2023 716/LAB/22-23 28/10/2022 DR CHATTERJEES VILLAGE WELFARE SOCIETY 0.33 0.00 0 0
6000 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Salary bill of NGO Laboratory personnel (Chemist/Bacteriologist and Lab Assistant) under Burdwan Division, PHE Dte. for the month of July'2022. VCH/000513/2022-2023 718/LAB/22-23 28/10/2022 AIKYATAN DEVELOPMENT SOCIETY 0.33 0.00 0 0
6001 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Salary bill of NGO Laboratory personnel (Chemist/Bacteriologist and Lab Assistant) under Burdwan Division, PHE Dte. for the month of July'2022. VCH/000511/2022-2023 717/LAB/22-23 28/10/2022 SHASTRI SMRITI SANGHA 0.31 0.00 0 0
6002 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Continuation work for 'Operation & Maintenance of 08 (Eight) Nos. Sub District Laboratories in different Blocks under Burdwan Division, PHE Dte. (Period from 01.03.2022 to 31.08.2022)' [GROUP : A] AE(HQs) J.E. 2 BURDWAN ORD/000541/2021-2022 111/AE/HQ 28/02/2022 180 COMPUTER MEDIA 3.01 2.83 94.02 0
6003 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Continuation work order for Annual Maintenance Contract (AMC) for software up-gradation and other software related issues in existing computers, refilling of cartridge of the printers, replacement of battery of UPS in District, Sub-District and NGO Laboratories under Burdwan Division, PHE Dte.[Period from 01/09/2021 to 31/08/2022] AE(HQs) J.E. 2 BURDWAN ORD/000686/2021-2022 1733/AE/HQ 27/08/2021 365 COMPUTER MEDIA 1.96 0.98 50 0
6004 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Maintenance charges of Burdwan District Laboratory under Burdwan Division PHE Dte. [Period from 01/08/2021 to 31/07/2022] ORD/000840/2021-2022 983/BSD 29/07/2021 360 ALAKA GHOSH 0.97 0.77 79.38 0
6005 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Payment of NGO LAB Personnel (Chemist/Bacteriologist & Lab Assistant) for the month of August'22. VCH/000816/2022-2023 795/LAB/22-23 24/11/2022 SHASTRI SMRITI SANGHA 0.31 0.00 0 0
6006 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Payment of NGO LAB Personnel (Chemist/Bacteriologist & Lab Assistant) for the month of August'22. VCH/000815/2022-2023 794/LAB/22-23 24/11/2022 DR CHATTERJEES VILLAGE WELFARE SOCIETY 0.33 0.00 0 0
6007 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Payment of NGO LAB Personnel (Chemist/Bacteriologist & Lab Assistant) for the month of August'22. VCH/000814/2022-2023 793/LAB/22-23 24/11/2022 AIKYATAN DEVELOPMENT SOCIETY 0.33 0.00 0 0
6008 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Salary of Lab personnel (Chemist/Bacteriologist and Lab Assistant) of NGO managed laboratory for the month of September'2022. BILL/00009/2022-2023 810/LAB/22-23 29/11/2022 DR CHATTERJEES VILLAGE WELFARE SOCIETY 0.33 0.00 0 0
6009 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Salary of Lab personnel (Chemist/Bacteriologist and Lab Assistant) of NGO managed laboratory for the month of September'2022. BILL/00010/2022-2023 811/LAB/22-23 29/11/2022 SHASTRI SMRITI SANGHA 0.31 0.00 0 0
6010 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Salary of Lab personnel (Chemist/Bacteriologist and Lab Assistant) of NGO managed laboratory for the month of September'2022. BILL/00011/2022-2023 809/LAB/22-23 29/11/2022 AIKYATAN DEVELOPMENT SOCIETY 0.33 0.00 0 0
6011 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Continuation Work Order for "Engagement of laboratory personnel (Chemist / Bacteriologist and Lab Assistant) in Ganganandapur Sub District Laboratory within Kalna Sub-Division under Burdwan Division, P.H.E. Dte., Purba Bardhaman. [Period from 01.07.2022 to 30.09.2022]". Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000213/2022-2023 581/KSD 30/06/2022 92 CLIFFORD FACILITY SERVICES PVT.LTD. 0.78 0.78 100 0
6012 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Continuation work order for "Engagement of laboratory personnel (Chemist / Bacteriologist and Lab Assistant) in Anukhal Sub-District Laboratory within Kalna Sub-Division under Burdwan Division, P.H.E. Dte., Purba Bardhaman. [Period from 01.07.2022 to 30.09.2022]" Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000214/2022-2023 582/KSD 30/06/2022 92 CLIFFORD FACILITY SERVICES PVT.LTD. 0.78 0.78 100 0
6013 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Continuation Work Order for "Engagement of laboratory personnel (Chemist / Bacteriologist and Lab Assistant) in Parulia Sub District Laboratory & Kamalnagar WTP laboratory within Kalna Sub-Division under Burdwan Division, P.H.E. Dte., Purba Bardhaman. [Period from 01.07.2022 to 30.09.2022]" Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000215/2022-2023 583/KSD 30/06/2022 92 CLIFFORD FACILITY SERVICES PVT.LTD. 1.23 1.23 100 0
6014 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Supply & Delivery of Chemicals, reagents and consumables for 14(Fourteen) laboratories under Burdwan Division, P.H.E. Dte. ORD/000303/2022-2023 3598/BWD 18/08/2022 20 M/S LAXMI ENTERPRISE 26.61 26.61 100 0
6015 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Payment for NGO Lab personnel (Chemist/Bacteriologist and Lab Assistant) for the month of October'2022. BILL/00130/2022-2023 945/JJM/22-23 09/01/2023 DR CHATTERJEES VILLAGE WELFARE SOCIETY 0.33 0.00 0 0
6016 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Payment for NGO Lab personnel (Chemist/Bacteriologist and Lab Assistant) for the month of October'2022. BILL/00129/2022-2023 944/JJM/22-23 09/01/2023 AIKYATAN DEVELOPMENT SOCIETY 0.33 0.00 0 0
6017 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Payment for NGO Lab personnel (Chemist/Bacteriologist and Lab Assistant) for the month of October'2022. BILL/00131/2022-2023 946/JJM/22-23 09/01/2023 SHASTRI SMRITI SANGHA 0.26 0.00 0 0
6018 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Supply of different laboratory equipment's at UPVC pipe Testing laboratory at Nababhat PHE Complex for monitoring and control over the quality of concrete of different water supply scheme under Burdwan Division, PHE Dte._2nd Call Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer2, Durgapur Sub-Division, PHE Dte. ORD/000024/2022-2023 195/DSD 04/04/2022 7 MAUVE ENGINEERING AND SERVICES PVT LTD 2.74 2.74 100 0
6019 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Providing acrylic distemper including electrical wiring work and fitting of wash basin for modification of old building of Bursul Godown area to set up Sikhaniketan Sub-Dist. Laboratory under Burdwan Division, PHE. Dte. AE(HQs) J.E. 2 BURDWAN ORD/000631/2022-2023 598/AE/HQ 07/12/2022 15 ANWESHA CONSTRUCTION 0.40 0.40 100 0
6020 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Proposed renovation extension and modification (Civil Structure Part) of Old Building of Borsul Godown area to set up Barshul Sub District Laboratory under Burdwan Division, PHE. Dte. AE(HQs) J.E. 2 BURDWAN ORD/000624/2022-2023 522/AE/HQ 29/09/2022 30 ANWESHA CONSTRUCTION 0.89 0.83 93.26 0
6021 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Continuation work for Engagement of laboratory personnel (Contractual) for smooth running of the uPVC pipe testing laboratory at Nababhat under Burdwan Division, PHE. Dte. [Period from 15.04.2022 to 14.09.2022]_Gr-A AE(HQs) J.E. 2 BURDWAN ORD/000651/2021-2022 132/AE/HQ 10/03/2022 6 M/S ASHA CONSTRUCTION 2.99 2.99 100 0
6022 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Engagement of laboratory personnel (Sampling Assistant) in 7 Nos. Sub District Laboratories under Burdwan Division, P.H.E. Dte. [Period from 01.08.2022 to 31.12.2022] GROUP : B AE(HQs) J.E. 2 BURDWAN ORD/000328/2022-2023 418/AE/HQ 29/07/2022 150 COMPUTER MEDIA 3.92 3.92 100 0
6023 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Continuation work for Engagement of resource person to operate AAS at District Laboratory under Burdwan Division, PHE. Dte. [Period from 01.09.2022 to 30.09.2022] [Gr. A] AE(HQs) J.E. 2 BURDWAN ORD/000427/2022-2023 457/AE/HQ 31/08/2022 30 ALAKA GHOSH 0.13 0.13 100 0
6024 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Engagement of resource person to operate AAS at District Laboratory under Burdwan Division, PHE. Dte. [Period from 01.10.2022 to 31.12.2022] AE(HQs) J.E. 2 BURDWAN ORD/000522/2022-2023 520/AE/HQ 29/09/2022 90 ALAKA GHOSH 0.50 0.50 100 0
6025 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Continuation Work Order for Engagement of Laboratory Personnel i.e. Chemist (One Person), Bacteriologist (One Person), Laboratory Assistant(One Person), Sampling Assistant (One Person) and Computer Operator/Data Entry Operator (One Person) for Burdwan District Laboratory under Burdwan Division, PHE Dte at PHE Complex, Nababhat, Burdwan. For the period from 01.09.2022 to 31.12.2022¿. ORD/000557/2022-2023 1489/BSD 26/08/2022 120 ALAKA GHOSH 3.14 3.14 100 0
6026 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Continuation work order for engagement of laboratory personnel (Chemist/Bacteriologist and Lab Assistant) in 2 Nos. Sub-Dist Laboratories within Head Quarters under Burdwan Division, PHE Dte. [Period from 01/07/2022 to 31/07/2022] AE(HQs) J.E. 2 BURDWAN ORD/000738/2022-2023 358/AE/HQ 28/06/2022 30 COMPUTER MEDIA 0.52 0.52 100 0
6027 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Continuation work order for engagement of laboratory personnel (Sampling Assistant) in 7 Nos. Sub-Dist Laboratories within Head Quarters under Burdwan Division, PHE Dte. [Period from 01/07/2022 to 31/07/2022] AE(HQs) J.E. 2 BURDWAN ORD/000739/2022-2023 357/AE/HQ 28/06/2022 30 COMPUTER MEDIA 0.78 0.78 100 0
6028 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Engagement of Laboratory personnel (Chemist/Bacteriologist and Lab Assistant) in 3 Nos. Sub District Laboratories within Headquarters under Burdwan Division, PHE Dte., Purba Bardhaman. [Period 01/08/2022 to 31/12/2022] GROUP : A AE(HQs) J.E. 2 BURDWAN ORD/000327/2022-2023 417/AE/HQ 29/07/2022 150 COMPUTER MEDIA 4.66 4.66 100 0
6029 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Engagement of laboratory personnel (Chemist / Bacteriologist and Lab Assistant) in Ganganandapur Sub District Laboratory within Kalna Sub-Division under Burdwan Division, P.H.E. Dte., Purba Bardhaman. [Period from 01.01.2022 to 30.06.2022] Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000587/2021-2022 1302/KSD 31/12/2021 180 CLIFFORD FACILITY SERVICES PVT.LTD. 1.57 0.00 0 0
6030 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Engagement of laboratory personnel (Chemist / Bacteriologist and Lab Assistant) in Anukhal Sub-District Laboratory within Kalna Sub-Division under Burdwan Division, P.H.E. Dte., Purba Bardhaman. [Period from 01.01.2022 to 30.06.2022]. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000586/2021-2022 1301/KSD 31/12/2021 180 CLIFFORD FACILITY SERVICES PVT.LTD. 1.57 0.00 0 0
6031 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Engagement of laboratory personnel (Chemist / Bacteriologist and Lab Assistant) in Parulia Sub District Laboratory & Kamalnagar WTP laboratory within Kalna Sub-Division under Burdwan Division, P.H.E. Dte., Purba Bardhaman. [Period from 01.07.2021 to 30.06.2022 (Sl No-1) Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000109/2021-2022 564/KSD 30/06/2021 360 CLIFFORD FACILITY SERVICES PVT.LTD. 4.93 1.64 33.27 0
6032 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Continuation work order for engagement of laboratory personnel (Chemist/Bacteriologist and Lab Assistant) in Ganganandapur Sub-District Laboratory within Kalna Sub-Division under Burdwan Division, PHE Dte.[Period from 01/01/2022 to 30/06/2022] Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000685/2021-2022 1302/KSD 31/12/2021 180 CLIFFORD FACILITY SERVICES PVT.LTD. 1.57 1.05 66.88 0
6033 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Continuation work order for engagement of laboratory personnel (Chemist/Bacteriologist and Lab Assistant) in Anukhal Sub-District Laboratory within Kalna Sub-Division under Burdwan Division, PHE Dte.[Period from 01/01/2022 to 30/06/2022] Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000687/2021-2022 1301/KSD 31/12/2021 180 CLIFFORD FACILITY SERVICES PVT.LTD. 1.57 1.05 66.88 0
6034 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Continuation work order for engagement of laboratory personnel (Chemist/Bacteriologist and Lab Assistant) in 02 Nos. Sub-District laboratories within Head Quarters under Burdwan Division, PHE Dte. [Period from 01/01/2022 to 30/06/2022] AE(HQs) J.E. 2 BURDWAN ORD/000802/2021-2022 1962/AE/HQ 28/12/2021 180 COMPUTER MEDIA 3.14 3.14 100 0
6035 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Providing service by assigning resource person for a period of 03 Months supervision of process of preparation for NABL recognition for Chemical Testing of portable water of Sub-District Level water quality laboratory including supply, installation of a requisites for NABL recognition through NABL GLAP application for 11 mandatory parameters and training on procedures with documentation thereof for SATGACHIA Sub-District water Testing Laboratory under Burdwan Division, PHE Dte.[Gr.-C] AE(HQs) J.E. 2 BURDWAN ORD/000780/2021-2022 1725/AE/HQ 25/08/2021 15 NATURAL RESOURCES CONSORTIUM 4.83 4.83 100 0
6036 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Salary of Lab personnel (Chemist/Bacteriologist and Lab Assistant) of NGO managed laboratory for the month of November'2022. BILL/00204/2022-2023 1066/JJM 13/02/2023 SHASTRI SMRITI SANGHA 0.31 0.00 0 0
6037 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Salary of Lab personnel (Chemist/Bacteriologist and Lab Assistant) of NGO managed laboratory for the month of November'2022. BILL/00205/2022-2023 1065/JJM 13/02/2023 AIKYATAN DEVELOPMENT SOCIETY 0.33 0.00 0 0
6038 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Festival Bonus F.Y.-2021-2022 BILL/00206/2022-2023 1067/JJM 15/02/2023 DR CHATTERJEES VILLAGE WELFARE SOCIETY 0.14 0.00 0 0
6039 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Festival Bonus F.Y.-2021-2022 BILL/00208/2022-2023 1069/JJM 15/02/2023 SHASTRI SMRITI SANGHA 0.10 0.00 0 0
6040 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Salary of Lab personnel (Chemist/Bacteriologist and Lab Assistant) of NGO managed laboratory for the month of November'2022. BILL/00203/2022-2023 1064/JJM 13/02/2023 DR CHATTERJEES VILLAGE WELFARE SOCIETY 0.33 0.00 0 0
6041 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Festival Bonus F.Y.-2021-2022 BILL/00207/2022-2023 1068/JJM 15/02/2023 AIKYATAN DEVELOPMENT SOCIETY 0.14 0.00 0 0
6042 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Engagement of Laboratory personnel (Chemist/Bacteriologist and Lab Assistant) in 2 Sub District Laboratories within Burdwan Sub-Division under Burdwan Division, P.H.E. Dte., Purba Bardhaman for the period from 01-07-2022 to 31-12-2022. Sl.No.69. ORD/000424/2022-2023 1129/BSD 30/06/2022 180 CLIFFORD FACILITY SERVICES PVT.LTD. 3.33 3.33 100 0
6043 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Engagement of laboratory personnel (Chemist / Bacteriologist and Lab Assistant) in 1 (One) Sub District Laboratoriy within Headquaters under Burdwan Division, P.H.E. Dte., Purba Bardhaman. [Period from 01.07.2022 to 31.07.2022] [GROUP : A] AE(HQs) J.E. 2 BURDWAN ORD/000304/2022-2023 362/AE/HQ 30/06/2022 31 COMPUTER MEDIA 0.26 0.26 100 0
6044 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Construction of concrete road & providing plinth protection due to soil erosion including wiring work at SANKARI Sub District Laboratory under Burdwan Division, PHE. Dte. AE(HQs) J.E. 2 BURDWAN ORD/000623/2022-2023 521/AE/HQ 29/09/2022 30 KAJAL MUKHERJEE 0.72 0.51 70.83 0
6045 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Engagement of laboratory personnel i.e. Chemist (One Person), Bacteriologist (One Person), Laboratory Assistant (One Person), Sampling Assistant (One Person) for Burdwan District Laboratory under Burdwan Division P.H.E Dte. at PHE Complex, Nababhat, Purba Bardhaman. For the period from 01.01.2023 to 31.01.2023. ORD/000642/2022-2023 2328/BSD 30/12/2022 31 ALAKA GHOSH 0.84 0.84 100 0
6046 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Engagement of laboratory personnel i.e. AAS Operator (One Person) and Computer Operator/Data Entry Operator (One Person) for Burdwan District Laboratory under Burdwan Division P.H.E Dte. at PHE Complex, Nababhat, Purba Bardhaman, For the period from 01.01.2023 to 31.01.2023. ORD/000643/2022-2023 2329/BSD 30/12/2022 31 ALAKA GHOSH 0.40 0.40 100 0
6047 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Supplying, delivery and installation of metal vinyle ACP board (4' x 3') for various water testing laboratories under Burdwan Division PHE Dte. AE(HQs) J.E. 2 BURDWAN ORD/000705/2022-2023 115/AE/HQ 22/02/2023 15 ISHAN CONSTRUCTION 0.84 0.84 100 0
6048 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Continuation work order for Engagement of resource person to operate AAS at District Laboratory under Burdwan Division, PHE. Dte. [Period from 16.05.2022 to 31.08.2022] [Gr. A] AE(HQs) J.E. 2 BURDWAN ORD/000064/2022-2023 276/AE/HQ 10/05/2022 108 ALAKA GHOSH 0.46 0.46 100 0
6049 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Salary of Lab personnel of NGO managed laboratory under Burdwan Division, PHE Dte. for the month of December'22. BILL/00355/2022-2023 1158/JJM 09/03/2023 AIKYATAN DEVELOPMENT SOCIETY 0.33 0.00 0 0
6050 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Salary of Lab personnel of NGO managed laboratory under Burdwan Division, PHE Dte. for the month of January'23. BILL/00358/2022-2023 1161/JJM 09/03/2023 SHASTRI SMRITI SANGHA 0.45 0.00 0 0
6051 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Salary of Lab personnel of NGO managed laboratory under Burdwan Division, PHE Dte. for the month of January'23. BILL/00357/2022-2023 1160/JJM 09/03/2023 AIKYATAN DEVELOPMENT SOCIETY 0.45 0.00 0 0
6052 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Salary of Lab personnel of NGO managed laboratory under Burdwan Division, PHE Dte. for the month of December'2022. BILL/00353/2022-2023 1156/JJM 09/03/2023 DR CHATTERJEES VILLAGE WELFARE SOCIETY 0.33 0.00 0 0
6053 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Salary of Lab personnel of NGO managed laboratory under Burdwan Division, PHE Dte. for the month of December'22. BILL/00354/2022-2023 1157/JJM 09/03/2023 SHASTRI SMRITI SANGHA 0.31 0.00 0 0
6054 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Salary of Lab personnel of NGO managed laboratory under Burdwan Division, PHE Dte. for the month of January'23. BILL/00356/2022-2023 1159/JJM 09/03/2023 DR CHATTERJEES VILLAGE WELFARE SOCIETY 0.45 0.00 0 0
6055 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Work Order for "Engagement of laboratory personnel (Chemist , Bacteriologist and Lab Assistant) in Anukhal Sub District Water Testing laboratory within Kalna Sub-Division under Burdwan Division, P.H.E. Dte., Purba Bardhaman. [Period from 01.01.2023 to 31.01.2023]" Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000612/2022-2023 1148/KSD 30/12/2022 31 ALAKA GHOSH 0.37 0.37 100 0
6056 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Work Order for "Engagement of laboratory personnel (Chemist / Bacteriologist and Lab Assistant) in Manteswar Sub District Water Testing Laboratory within Kalna Sub-Division under Burdwan Division, P.H.E. Dte., Purba Bardhaman. [Period from 01.01.2023 to 31.01.2023]." Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000609/2022-2023 1115/KSD 23/12/2022 31 ALAKA GHOSH 0.59 0.59 100 0
6057 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Maintenance charges of Burdwan District Laboratory under Burdwan Division,PHE Dte (Period from 01.08.2022 to 31.12.2022). Gr.A. ORD/000505/2022-2023 1328/BSD 28/07/2022 150 ALAKA GHOSH 0.37 0.35 94.59 0
6058 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Work Order for "Engagement of laboratory personnel (Chemist / Bacteriologist and Lab Assistant) in Manteswar Sub District Water Testing Laboratory within Kalna Sub-Division under Burdwan Division, P.H.E. Dte., Purba Bardhaman. [Period from 01.10.2022 to 31.10.2022]." Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000606/2022-2023 937/KSD 29/09/2022 31 ALAKA GHOSH 0.43 0.43 100 0
6059 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Work Order for "Engagement of laboratory personnel (Chemist / Bacteriologist and Lab Assistant) in Manteswar Sub District Water Testing Laboratory within Kalna Sub-Division under Burdwan Division, P.H.E. Dte., Purba Bardhaman. [Period from 01.09.2022 to 30.09.2022]." Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000586/2022-2023 711/KSD 23/08/2022 30 ALAKA GHOSH 0.43 0.43 100 0
6060 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Work Order for "Engagement of laboratory personnel (Chemist / Bacteriologist and Lab Assistant) in Manteswar Sub District Water Testing Laboratory within Kalna Sub-Division under Burdwan Division, P.H.E. Dte., Purba Bardhaman. [Period from 01.08.2022 to 31.08.2022]". Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000585/2022-2023 607/KSD 25/07/2022 31 ALAKA GHOSH 0.43 0.43 100 0
6061 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Work Order for "Engagement of laboratory personnel (Chemist / Bacteriologist and Lab Assistant) in Manteswar Sub District Water Testing Laboratory within Kalna Sub-Division under Burdwan Division, P.H.E. Dte., Purba Bardhaman. [Period from 01.11.2022 to 31.12.2022]." Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000608/2022-2023 969/KSD 20/10/2022 61 ALAKA GHOSH 0.87 0.87 100 0
6062 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Continuation work order for "Engagement of laboratory personnel (Chemist / Bacteriologist and Lab Assistant) in Manteswar Sub District Water Testing Laboratory within Kalna Sub-Division under Burdwan Division, P.H.E. Dte., Purba Bardhaman. [Period from 01.02.2023 to 28.02.2023]." Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000745/2022-2023 70/A/KSD 30/01/2023 28 ALAKA GHOSH 0.59 0.59 100 0
6063 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Continuation work order for "Engagement of laboratory personnel (Chemist , Bacteriologist and Lab Assistant) in Anukhal Sub District Water Testing laboratory within Kalna Sub-Division under Burdwan Division, P.H.E. Dte., Purba Bardhaman. [Period from 01.02.2023 to 28.02.2023]" Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000746/2022-2023 70/B/KSD 30/01/2023 28 ALAKA GHOSH 0.37 0.37 100 0
6064 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Continuation Work Order for engagement of laboratory personnel i.e. Chemist (One Person), Bacteriologist (One Person), Laboratory Assistant (One Person) , Sampling Assistant (One Person) for Burdwan District Laboratory under Burdwan Division P.H.E Dte. at PHE Complex, Nababhat, Purba Bardhaman. For the period from 01.02.2023 to 28.02.2023. ORD/000781/2022-2023 121/BSD 01/02/2023 28 ALAKA GHOSH 0.84 0.84 100 0
6065 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Continuation Work Order for ¿engagement of laboratory personnels i.e. AAS Operator (One Person) and Computer Operator/Data Entry Operator (One Person) for Burdwan District Laboratory under Burdwan Division P.H.E Dte. at PHE Complex, Nababhat, Purba Bardhaman, For the period from 01.02.2023 to 28.02.2023. ORD/000782/2022-2023 122/BSD 01/02/2023 28 ALAKA GHOSH 0.40 0.40 100 0
6066 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Procurement of consumables for OMAS for different Sub District Laboratories under Burdwan Division PHE Dte. [GROUP : A] AE(HQs) J.E. 2 BURDWAN ORD/000332/2022-2023 450/AE/HQ 25/08/2022 7 SUNANDA ENVIROMENTAL INTERNATIONAL PVT LTD. 4.97 4.97 100 0
6067 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Work Order for "Engagement of laboratory personnel (Chemist , Bacteriologist and Lab Assistant) in Parulia Sub District Water Testing Laboratory & Kamalnagar WTP laboratory within Kalna Sub-Division under Burdwan Division, P.H.E. Dte., Purba Bardhaman. [Period from 01.01.2023 to 31.01.2023]" Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000611/2022-2023 1145/KSD 30/12/2022 31 SURATH DEY 0.59 0.59 100 0
6068 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Work Order for "Engagement of laboratory personnel (Chemist , Bacteriologist and Lab Assistant) in Ganganandapur Sub-District Water Testing Laboratory within Kalna Sub-Division under Burdwan Division, P.H.E. Dte., Purba Bardhaman. [Period from 01.01.2023 to 31.01.2023]" Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000613/2022-2023 1149/KSD 30/12/2022 31 BUILD-TECH 0.37 0.37 100 0
6069 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Continuation work order for "Engagement of laboratory personnel (Chemist , Bacteriologist and Lab Assistant) in Parulia Sub District Water Testing Laboratory & Kamalnagar WTP laboratory within Kalna Sub-Division under Burdwan Division, P.H.E. Dte., Purba Bardhaman. [Period from 01.02.2023 to 28.02.2023]" Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000748/2022-2023 71/B/KSD 30/01/2023 28 SURATH DEY 0.59 0.59 100 0
6070 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Continuation work order for "Engagement of laboratory personnel (Chemist , Bacteriologist and Lab Assistant) in Ganganandapur Sub-District Water Testing Laboratory within Kalna Sub-Division under Burdwan Division, P.H.E. Dte., Purba Bardhaman. [Period from 01.02.2023 to 28.02.2023]" Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000747/2022-2023 71/A/KSD 30/01/2023 28 BUILD-TECH 0.37 0.37 100 0
6071 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Continuation Work Order for engagement of laboratory personnel i.e. AAS Operator (One Person) and Computer Operator/Data Entry Operator (One Person) for Burdwan District Laboratory under Burdwan Division P.H.E Dte. at PHE Complex, Nababhat, Purba Bardhaman, For the period from 01.03.2023 to 31.03.2023. ORD/000836/2022-2023 337/BSD 27/02/2023 31 ALAKA GHOSH 0.40 0.40 100 0
6072 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Continuation Work Order for engagement of laboratory personnel i.e. Chemist (One Person), Bacteriologist (One Person), Laboratory Assistant (One Person), Sampling Assistant (One Person) for Burdwan District Laboratory under Burdwan Division P.H.E Dte. at PHE Complex, Nababhat, Purba Bardhaman. For the period from 01.03.2023 to 31.03.2023. ORD/000837/2022-2023 336/BSD 27/02/2023 31 ALAKA GHOSH 0.84 0.84 100 0
6073 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Cotinuation work order for "Engagement of laboratory personnel (Chemist , Bacteriologist and Lab Assistant) in Anukhal Sub District Water Testing laboratory within Kalna Sub-Division under Burdwan Division, P.H.E. Dte., Purba Bardhaman. [Period from 01.03.2023 to 31.03.2023]" JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000783/2022-2023 165/KSD 27/02/2023 31 ALAKA GHOSH 0.37 0.37 100 0
6074 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Continuation work order for "Engagement of laboratory personnel (Chemist / Bacteriologist and Lab Assistant) in Manteswar Sub District Water Testing Laboratory within Kalna Sub-Division under Burdwan Division, P.H.E. Dte., Purba Bardhaman. [Period from 01.03.2023 to 31.03.2023]." JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000784/2022-2023 166/KSD 27/02/2023 31 ALAKA GHOSH 0.59 0.59 100 0
6075 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Continuation work order for "Engagement of laboratory personnel (Chemist , Bacteriologist and Lab Assistant) in Parulia Sub District Water Testing Laboratory & Kamalnagar WTP laboratory within Kalna Sub-Division under Burdwan Division, P.H.E. Dte., Purba Bardhaman. [Period from 01.03.2023 to 31.03.2023]" JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000786/2022-2023 168/KSD 27/02/2023 31 SURATH DEY 0.59 0.59 100 0
6076 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP NGO Salary bill for the month of February'23. BILL/00554/2022-2023 12/JJM 17/04/2023 SHASTRI SMRITI SANGHA 0.45 0.00 0 0
6077 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP NGO Salary bill for the month of February'23. BILL/00552/2022-2023 10/JJM 17/04/2023 DR CHATTERJEES VILLAGE WELFARE SOCIETY 0.45 0.00 0 0
6078 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP NGO Salary bill for the month of February'23. BILL/00553/2022-2023 11/JJM 17/04/2023 AIKYATAN DEVELOPMENT SOCIETY 0.45 0.00 0 0
6079 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Maintenance charges bill for the period January'2022 to June'2022. BILL/00532/2022-2023 53/JJM 27/04/2023 DR CHATTERJEES VILLAGE WELFARE SOCIETY 0.40 0.00 0 0
6080 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Maintenance charges bill for the Period January'22 to June'22. BILL/00533/2022-2023 52/JJM 27/04/2023 SHASTRI SMRITI SANGHA 0.40 0.00 0 0
6081 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Maintenance charges bill for the period January'22 to June'22. BILL/00534/2022-2023 52/JJM 27/04/2023 AIKYATAN DEVELOPMENT SOCIETY 0.40 0.00 0 0
6082 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Engagement of Laboratory personnel (Chemist/Bacteriologist and Lab Assistant)in 2 Sub District Laboratories within Burdwan Sub-Division under Burdwan Division, P.H.E. Dte., Purba Bardhaman for the period from 01-05-2023 to 31-05-2023 ORD/000217/2023-2024 792/BSD 28/04/2023 31 CLIFFORD FACILITY SERVICES PVT.LTD. 0.52 0.00 0 0
6083 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Continuation Work Order for "Engagement of laboratory personnel (Chemist , Bacteriologist and Lab Assistant) in Ganganandapur Sub-District Water Testing Laboratory within Kalna Sub-Division under Burdwan Division, P.H.E. Dte., Purba Bardhaman. [Period from 01.04.2023 to 30.04.2023]" Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000822/2022-2023 292/KSD 31/03/2023 30 BUILD-TECH 0.37 0.37 100 0
6084 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Payment of NGO lab personnel (Chemist/Bacteriologist and Lab Assistant) for the month of April'23. BILL/00102/2023-2024 197/JJM 31/05/2023 AIKYATAN DEVELOPMENT SOCIETY 0.45 0.00 0 0
6085 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Payment of NGO lab personnel (Chemist/Bacteriologist and Lab Assistant) for the month of April'23. BILL/00101/2023-2024 196/JJM 31/05/2023 DR CHATTERJEES VILLAGE WELFARE SOCIETY 0.45 0.00 0 0
6086 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Payment of NGO lab personnel (Chemist/Bacteriologist and Lab Assistant) for the month of April'23. BILL/00103/2023-2024 198/JJM 31/05/2023 SHASTRI SMRITI SANGHA 0.45 0.00 0 0
6087 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Salary of NGO Lab personnel (Chemist/Bacteriologist and Lab Assistant) for the month of March'23. BILL/00068/2023-2024 169/JJM 26/05/2023 AIKYATAN DEVELOPMENT SOCIETY 0.45 0.00 0 0
6088 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Salary of NGO Lab personnel (Chemist/Bacteriologist and Lab Assistant) for the month of March'23. BILL/00069/2023-2024 170/JJM 26/05/2023 SHASTRI SMRITI SANGHA 0.45 0.00 0 0
6089 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Salary of NGO Lab personnel (Chemist/Bacteriologist and Lab Assistant) for the month of March'23. BILL/00078/2023-2024 168/JJM 26/05/2023 DR CHATTERJEES VILLAGE WELFARE SOCIETY 0.45 0.00 0 0
6090 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Engagement of Laboratory personnel (Chemist/Bacteriologist, Lab Assistant & Sampling Assistant) in Satgachia Sub District Laboratory within Headquarters under Burdwan Division, PHE Dte., Purba Bardhaman. [Period 01/01/2023 to 31/01/2023] AE(HQs) J.E. 2 BURDWAN ORD/000616/2022-2023 661/AE/HQ 30/12/2022 31 COMPUTER MEDIA 0.51 0.51 100 100
6091 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Engagement of Laboratory personnel (Chemist/Bacteriologist & Lab Assistant) in Barshul Sub District Laboratory within Headquarters under Burdwan Division, PHE Dte., Purba Bardhaman. [Period 01/01/2023 to 31/01/2023] AE(HQs) J.E. 2 BURDWAN ORD/000618/2022-2023 663/AE/HQ 30/12/2022 31 COMPUTER MEDIA 0.58 0.58 100 100
6092 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Continuation Work order "Engagement of laboratory personnel (Chemist , Bacteriologist and Lab Assistant) in Ganganandapur Sub-District Water Testing Laboratory within Kalna Sub-Division under Burdwan Division, P.H.E. Dte., Purba Bardhaman. [Period from 01.03.2023 to 31.03.2023]" JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000785/2022-2023 167/KSD 27/02/2023 31 BUILD-TECH 0.37 0.37 100 100
6093 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Engagement of Laboratory personnel (Sampling Assistant) in 5 Nos. Sub District Laboratories within Burdwan Division, PHE Dte., Purba Bardhaman. [Period from 01.01.2023 to 31.01.2023] AE(HQs) J.E. 2 BURDWAN ORD/000873/2022-2023 666/AE/HQ 30/12/2022 31 COMPUTER MEDIA 0.74 0.74 100 100
6094 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Continuation work for Engagement of Laboratory personnel (Sampling Assistant) in 5 Nos. Sub District Laboratories within Burdwan Division, PHE Dte., Purba Bardhaman. [Period from 01.03.2023 to 31.03.2023] AE(HQs) J.E. 2 BURDWAN ORD/000905/2022-2023 121/AE/HQ 27/02/2023 31 COMPUTER MEDIA 0.74 0.74 100 100
6095 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Continuation work for Engagement of Laboratory personnel (Sampling Assistant) in 5 Nos. Sub District Laboratories within Burdwan Division, PHE Dte., Purba Bardhaman. [Period from 01.02.2023 to 28.02.2023] AE(HQs) J.E. 2 BURDWAN ORD/000904/2022-2023 87/AE/HQ 31/01/2023 28 COMPUTER MEDIA 0.74 0.74 100 100
6096 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Engagement of Laboratory personnel (Chemist/Bacteriologist, Lab Assistant & Sampling Assistant) in Shaktigarh Sub District Laboratory within Headquarters under Burdwan Division, PHE Dte., Purba Bardhaman. [Period 01/01/2023 to 31/01/2023] AE(HQs) J.E. 2 BURDWAN ORD/000617/2022-2023 662/AE/HQ 30/12/2022 31 COMPUTER MEDIA 0.51 0.51 100 100
6097 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Continuation Work Order for Engagement of laboratory personnel i.e. AAS Operator (One Person) and Computer Operator/Data Entry Operator (One Person) for Burdwan District Laboratory under Burdwan Division P.H.E Dte. at PHE Complex, Nababhat, Purba Bardhaman, For the period from 01.04.2023 to 30.04.2023. ORD/000884/2022-2023 600/BSD 30/03/2023 30 ALAKA GHOSH 0.40 0.40 100 100
6098 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Engagement of Laboratory personnel (Chemist/Bacteriologist, Lab Assistant & Sampling Assistant) in Shaktigarh Sub District Laboratory within Headquarters under Burdwan Division, PHE Dte., Purba Bardhaman. [Period 01/02/2023 to 28/02/2023] AE(HQs) J.E. 2 BURDWAN ORD/000896/2022-2023 89/AE/HQ 31/01/2023 28 COMPUTER MEDIA 0.51 0.51 100 100
6099 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Continuation work order for engagement of laboratory personnel i.e. AAS Operator (One Person) and Computer Operator/Data Entry Operator (One Person) for Burdwan District Laboratory under Burdwan Division P.H.E Dte. at PHE Complex, Nababhat, Purba Bardhaman, For the period from 01.05.2023 to 31.05.2023. ORD/000166/2023-2024 778/BSD 27/04/2023 31 ALAKA GHOSH 0.40 0.40 100 100
6100 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Engagement of Laboratory personnel (Chemist/Bacteriologist, Lab Assistant & Sampling Assistant) in Shaktigarh Sub District Laboratory within Headquarters under Burdwan Division, PHE Dte., Purba Bardhaman. [Period 01/03/2023 to 31/03/2023] AE(HQs) J.E. 2 BURDWAN ORD/000897/2022-2023 119/AE/HQ 27/02/2023 31 COMPUTER MEDIA 0.51 0.51 100 100
6101 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Maintenance of NGO managed laboratory for the period July'22 to December'22. BILL/00133/2023-2024 381/JJM 19/07/2023 AIKYATAN DEVELOPMENT SOCIETY 0.35 0.00 0 0
6102 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Maintenance of NGO managed laboratory for the period July'22 to December'22. BILL/00135/2023-2024 380/JJM 19/07/2023 DR CHATTERJEES VILLAGE WELFARE SOCIETY 0.35 0.00 0 0
6103 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Maintenance of NGO managed laboratory for the period July'22 to December'22. BILL/00134/2023-2024 382/JJM 19/07/2023 SHASTRI SMRITI SANGHA 0.35 0.00 0 0
6104 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Continuation Work Order for Engagement of laboratory personnel i.e. Chemist (One Person), Bacteriologist (One Person), Laboratory Assistant (One Person) , Sampling Assistant (One Person) for Burdwan District Laboratory under Burdwan Division P.H.E Dte. at PHE Complex, Nababhat, Purba Bardhaman. For the period from 01.04.2023 to 30.04.2023. ORD/000883/2022-2023 599/BSD 30/03/2023 30 ALAKA GHOSH 0.84 0.84 100 100
6105 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Continuation work order for engagement of laboratory personnels i.e. Chemist (One Person), Bacteriologist (One Person), Laboratory Assistant (One Person), Sampling Assistant (One Person) for Burdwan District Laboratory under Burdwan Division P.H.E Dte. at PHE Complex, Nababhat, Purba Bardhaman. For the period from 01.05.2023 to 31.05.2023. ORD/000165/2023-2024 777/BSD 27/04/2023 31 ALAKA GHOSH 0.84 0.84 100 100
6106 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Salary of NGO for the month of May'23. BILL/00373/2023-2024 513/JJM 16/08/2023 DR CHATTERJEES VILLAGE WELFARE SOCIETY 0.45 0.00 0 0
6107 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Salary of NGO for the month of May'23. BILL/00374/2023-2024 515/JJM 16/08/2023 SHASTRI SMRITI SANGHA 0.45 0.00 0 0
6108 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Salary of NGO for the month of May'23. BILL/00375/2023-2024 514/JJM 16/08/2023 AIKYATAN DEVELOPMENT SOCIETY 0.45 0.00 0 0
6109 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Arrangement of drinking water supply in BONNABAGRAM Water Testing Laboratory by sinking of 75 Mtr. Deep 40 x 100 mm. dia., with PVC pipe, DWP Tube wells in the district of Purba Bardhaman under Burdwan Division, PHE. Dte. AE(HQs) J.E. 2 BURDWAN ORD/000361/2023-2024 357/AE/HQ 18/07/2023 30 UDYOG CONSTRUCTION 0.96 0.00 0 0
6110 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Continuation work order for "Engagement of laboratory personnel (Chemist , Bacteriologist and Lab Assistant) in Parulia Sub District Water Testing Laboratory & Kamalnagar WTP laboratory within Kalna Sub-Division under Burdwan Division, P.H.E. Dte., Purba Bardhaman. [Period from 01.04.2023 to 30.04.2023]" Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000823/2022-2023 293/KSD 31/03/2023 30 SURATH DEY 0.59 0.59 100 100
6111 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Continuation work order for "Engagement of laboratory personnel (Chemist , Bacteriologist and Lab Assistant) in Anukhal Sub District Water Testing laboratory within Kalna Sub-Division under Burdwan Division, P.H.E. Dte., Purba Bardhaman. [Period from 01.04.2023 to 30.04.2023]" Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000820/2022-2023 290/KSD 31/03/2023 30 ALAKA GHOSH 0.37 0.37 100 100
6112 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Continuation work Order for "Engagement of laboratory personnel (Chemist / Bacteriologist and Lab Assistant) in Manteswar Sub District Water Testing Laboratory within Kalna Sub-Division under Burdwan Division, P.H.E. Dte., Purba Bardhaman. [Period from 01.04.2023 to 30.04.2023]." Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000821/2022-2023 291/KSD 31/03/2023 30 ALAKA GHOSH 0.59 0.59 100 100
6113 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Salary of NGO Lab Personnel for the month of June & July'23. BILL/00393/2023-2024 552/JJM 21/08/2023 SHASTRI SMRITI SANGHA 0.90 0.00 0 0
6114 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Salary of NGO Lab Personnel for the month of June & July'23. BILL/00392/2023-2024 551/JJM 21/08/2023 AIKYATAN DEVELOPMENT SOCIETY 0.90 0.00 0 0
6115 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Salary of NGO Lab Personnel for the month of June & July'23. BILL/00391/2023-2024 550/JJM 21/08/2023 DR CHATTERJEES VILLAGE WELFARE SOCIETY 0.90 0.00 0 0
6116 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Work order for "Engagement of laboratory personnel (Chemist / Bacteriologist and Lab Assistant) in Anukhal Sub-District Laboratory within Kalna Sub-Division under Burdwan Division, P.H.E. Dte., Purba Bardhaman. [Period from 01.10.2022 to 31.12.2022] " Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000556/2022-2023 941/KSD 29/09/2022 92 CLIFFORD FACILITY SERVICES PVT.LTD. 0.78 0.78 100 100
6117 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP work order for "Engagement of laboratory personnel (Chemist / Bacteriologist and Lab Assistant) in Ganganandapur Sub District Laboratory within Kalna Sub-Division under Burdwan Division, P.H.E. Dte., Purba Bardhaman. [Period from 01.10.2022 to 31.12.2022]" Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000558/2022-2023 941/B/KSD 29/09/2022 92 CLIFFORD FACILITY SERVICES PVT.LTD. 0.78 0.78 100 100
6118 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Work Order for Engagement of laboratory personnel (Chemist / Bacteriologist and Lab Assistant) in Parulia Sub District Laboratory & Kamalnagar WTP laboratory within Kalna Sub-Division under Burdwan Division, P.H.E. Dte., Purba Bardhaman. [Period from 01.10.2022 to 31.12.2022] Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000559/2022-2023 941/C/KSD 29/09/2022 92 CLIFFORD FACILITY SERVICES PVT.LTD. 1.23 1.23 100 100
6119 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Continuation work order for "Engagement of laboratory personnel (Chemist , Bacteriologist and Lab Assistant) in Ganganandapur Sub-District Water Testing Laboratory within Kalna Sub-Division under Burdwan Division, P.H.E. Dte., Purba Bardhaman. [Period from 01.05.2023 to 31.05.2023]". JUNIOR ENGINEER R.W.S. BURDWAN SUB-DIVISION PHE DTE ORD/000189/2023-2024 373/KSD 25/04/2023 31 BUILD-TECH 0.37 0.37 100 100
6120 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Continuation work order for "Engagement of laboratory personnel (Chemist , Bacteriologist and Lab Assistant) in Anukhal Sub District Water Testing laboratory within Kalna Sub-Division under Burdwan Division, P.H.E. Dte., Purba Bardhaman. [Period from 01.05.2023 to 31.05.2023]" JUNIOR ENGINEER R.W.S. BURDWAN SUB-DIVISION PHE DTE ORD/000186/2023-2024 371/KSD 25/04/2023 31 ALAKA GHOSH 0.37 0.37 100 100
6121 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Continuation work order for Engagement of laboratory personnel (Chemist / Bacteriologist and Lab Assistant) in Manteswar Sub District Water Testing Laboratory within Kalna Sub-Division under Burdwan Division, P.H.E. Dte., Purba Bardhaman. [Period from 01.05.2023 to 31.05.2023]. JUNIOR ENGINEER R.W.S. BURDWAN SUB-DIVISION PHE DTE ORD/000187/2023-2024 372/KSD 25/04/2023 31 ALAKA GHOSH 0.59 0.59 100 100
6122 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Maintenance of NGO managed laboratory for the period January'22 to June'22. BILL/00432/2023-2024 594/JJM 31/08/2023 SIKSHA-NIKATAN 0.21 0.00 0 0
6123 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Continuation work order for Engagement of Laboratory personnel (Chemist/ Bacteriologist & Lab Assistant) in Barshul Sub District Laboratory within Headquarters under Burdwan Division, PHE Dte., Purba Bardhaman. [Period 01/02/2023 to 28/02/2023] AE(HQs) J.E. 2 BURDWAN ORD/000907/2022-2023 89-A/AE/HQ 31/01/2023 28 COMPUTER MEDIA 0.58 0.58 100 100
6124 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Continuation work order for Engagement of Laboratory personnel (Chemist/ Bacteriologist & Lab Assistant) in Barshul Sub District Laboratory within Headquarters under Burdwan Division, PHE Dte., Purba Bardhaman. [Period 01/05/2023 to 31/05/2023] AE(HQs) J.E. 2 BURDWAN ORD/000168/2023-2024 274-A/AE/HQ 27/04/2023 31 COMPUTER MEDIA 0.58 0.58 100 100
6125 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Continuation work order for Engagement of Laboratory personnel (Chemist/ Bacteriologist & Lab Assistant) in Barshul Sub District Laboratory within Headquarters under Burdwan Division, PHE Dte., Purba Bardhaman. [Period 01/04/2023 to 30/04/2023] AE(HQs) J.E. 2 BURDWAN ORD/000909/2022-2023 207/AE/HQ 31/03/2023 30 COMPUTER MEDIA 0.58 0.58 100 100
6126 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Continuation work order for Engagement of Laboratory personnel (Chemist/ Bacteriologist & Lab Assistant) in Barshul Sub District Laboratory within Headquarters under Burdwan Division, PHE Dte., Purba Bardhaman. [Period 01/03/2023 to 31/03/2023] AE(HQs) J.E. 2 BURDWAN ORD/000908/2022-2023 118/AE/HQ 27/02/2023 31 COMPUTER MEDIA 0.58 0.58 100 100
6127 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Continuation work for 'Operation & Maintenance of 08 (Eight) Nos. Sub District Laboratories in different Blocks under Burdwan Division, PHE Dte. (Period from 01.09.2022 to 31.12.2022)' [GROUP : A] AE(HQs) J.E. 2 BURDWAN ORD/000465/2022-2023 459/AE/HQ 31/08/2022 120 COMPUTER MEDIA 1.99 1.81 90.95 100
6128 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Continuation work order for Annual Maintenance Contract (AMC) for software upgradation and other software related issues in existing computers, refilling of Cartridge of the printers, replacement of battery of UPS in District, Sub-Dist. and NGO Laboratories under Burdwan Division, P.H.E. Dte. [Period from 01.09.2022 to 31.12.2022] [Group : A] AE(HQs) J.E. 2 BURDWAN ORD/000466/2022-2023 458/AE/HQ 31/08/2022 120 COMPUTER MEDIA 0.65 0.65 100 100
6129 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Supply & Delivery of Chemicals, reagents and consumables for 14(Fourteen) laboratories under Burdwan Division, P.H.E. Dte. ORD/000087/2023-2024 2153/BWD 10/05/2023 20 BHARATI CHEMICAL & SCIENTIFIC WORKS 30.43 30.43 100 100
6130 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Salary of NGO Lab for the month of August'23. BILL/00659/2023-2024 755/JJM 11/10/2023 AIKYATAN DEVELOPMENT SOCIETY 0.45 0.00 0 0
6131 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Salary of NGO Lab for the month of August'23. BILL/00660/2023-2024 754/JJM 11/10/2023 SHASTRI SMRITI SANGHA 0.45 0.00 0 0
6132 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Salary of NGO Lab for the month of August'23. BILL/00658/2023-2024 756/JJM 11/10/2023 DR CHATTERJEES VILLAGE WELFARE SOCIETY 0.45 0.00 0 0
6133 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Continuation Work Order for Engagement of Laboratory personnel (Chemist/ Bacteriologist, Lab Assistant & Sampling Assistant) in Satgachia Sub District Laboratory within Headquarters under Burdwan Division, PHE Dte., Purba Bardhaman. [Period 01/03/2023 to 31/03/2023] AE(HQs) J.E. 2 BURDWAN ORD/000912/2022-2023 120/AE/HQ 27/02/2023 31 COMPUTER MEDIA 0.51 0.51 100 100
6134 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Continuation Work Order for Engagement of Laboratory personnel (Chemist/ Bacteriologist, Lab Assistant & Sampling Assistant) in Satgachia Sub District Laboratory within Headquarters under Burdwan Division, PHE Dte., Purba Bardhaman. [Period 01/04/2023 to 30/04/2023] AE(HQs) J.E. 2 BURDWAN ORD/000913/2022-2023 206/AE/HQ 31/03/2023 30 COMPUTER MEDIA 0.51 0.51 100 100
6135 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Continuation Work Order for Engagement of Laboratory personnel (Chemist/ Bacteriologist, Lab Assistant & Sampling Assistant) in Satgachia Sub District Laboratory within Headquarters under Burdwan Division, PHE Dte., Purba Bardhaman. [Period 01/05/2023 to 31/05/2023] AE(HQs) J.E. 2 BURDWAN ORD/000170/2023-2024 273/AE/HQ 27/04/2023 31 COMPUTER MEDIA 0.51 0.51 100 100
6136 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Continuation Work Order for Engagement of Laboratory personnel (Chemist/ Bacteriologist, Lab Assistant & Sampling Assistant) in Satgachia Sub District Laboratory within Headquarters under Burdwan Division, PHE Dte., Purba Bardhaman. [Period 01/02/2023 to 28/02/2023] AE(HQs) J.E. 2 BURDWAN ORD/000911/2022-2023 88/AE/HQ 31/01/2023 28 COMPUTER MEDIA 0.51 0.51 100 100
6137 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Salary of Lab personnel of NGO managed laboratory for the month of September'23 and festival bonus. BILL/00869/2023-2024 878/JJM 10/11/2023 AIKYATAN DEVELOPMENT SOCIETY 0.61 0.00 0 0
6138 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Salary of Lab personnel of NGO managed laboratory for the month of September'23 and festival bonus. BILL/00870/2023-2024 879/JJM 10/11/2023 DR CHATTERJEES VILLAGE WELFARE SOCIETY 0.61 0.00 0 0
6139 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Salary of Lab personnel of NGO managed laboratory for the month of September'23 and festival bonus. BILL/00871/2023-2024 880/JJM 10/11/2023 SHASTRI SMRITI SANGHA 0.61 0.00 0 0
6140 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Laboratory maintenance in 7 Nos. Sub District Laboratories under Burdwan Division, PHE Dte., Purba Bardhaman. [Period from 01.03.2023 to 30.04.2023] AE(HQs) J.E. 2 BURDWAN ORD/000899/2022-2023 122/AE/HQ 27/02/2023 59 COMPUTER MEDIA 0.85 0.41 48.24 100
6141 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Engagement of laboratory personnel i.e. Chemist (One Person), AAS Operator (One person) Bacteriologist (One Person), Laboratory Assistant (One Person), Sampling Assistant (One Person) and Computer Operator/Data Entry Operator (One Person) for Burdwan District Laboratory under Burdwan Division P.H.E Dte. at PHE Complex, Nababhat, Purba Bardhaman. [Period for 6 (Six) Months i.e. 01.06.2023 to 30.11.2023]. ORD/000156/2023-2024 2449/BWD 31/05/2023 180 ALAKA GHOSH 7.40 3.97 53.65 100
6142 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Renovation of District Laboratory with meeting hall at Nababhat P.H.E Complex within RWS Sub-Division under Burdwan Division, PHE Dte. ORD/000139/2023-2024 788/BSD 28/04/2023 30 GHOSH ENTERPRISE 0.94 0.94 100 100
6143 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Payment of festival bonus for the accounting year 2021-22 to laboratory personnel of District and Sub-District laboratory under Burdwan Division, PHE Dte. AE(HQs) J.E. 2 BURDWAN ORD/000615/2022-2023 511/AE/HQ 26/09/2022 7 M/S S. CHOUDHURY 0.83 0.00 0 100
6144 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Salary bill of NGO for the month of October & November 2023. BILL/01071/2023-2024 1066/JJM 13/12/2023 AIKYATAN DEVELOPMENT SOCIETY 0.90 0.00 0 0
6145 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Salary bill for the month of October & November'2023. BILL/01070/2023-2024 1065/JJM 13/12/2023 DR CHATTERJEES VILLAGE WELFARE SOCIETY 0.90 0.00 0 0
6146 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Salary bill of NGO for the month of October & November 2023. BILL/01072/2023-2024 1067/JJM 13/12/2023 SHASTRI SMRITI SANGHA 0.90 0.00 0 0
6147 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Arrangement of drinking water supply in SANKARI Water Testing Laboratory by sinking of 75 Mtr. Deep 40 x 100 mm. dia., with PVC pipe, DWP Tube wells in the district of Purba Bardhaman under Burdwan Division, PHE. Dte. AE(HQs) J.E. 2 BURDWAN ORD/000358/2023-2024 354/AE/HQ 18/07/2023 30 SOUMYAVASH DAS 0.96 0.47 48.96 100
6148 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Arrangement of drinking water supply in SHAKTIGARH Water Testing Laboratory by sinking of 75Mtr. Deep 40 x 100 mm. dia., with PVC pipe, DWP Tube wells in the district of Purba Bardhaman under Burdwan Division, PHE. Dte. AE(HQs) J.E. 2 BURDWAN ORD/000354/2023-2024 350/AE/HQ 18/07/2023 30 A R TRADERS 0.77 0.77 100 100
6149 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Arrangement of drinking water supply in ANUKHAL Water Testing Laboratory by sinking of 75 Mtr. Deep 40 x 100 mm. dia., with PVC pipe, DWP Tube wells in the district of Purba Bardhaman under Burdwan Division, PHE. Dte. AE(HQs) J.E. 2 BURDWAN ORD/000360/2023-2024 356/AE/HQ 18/07/2023 30 M/S F.S. ENTERPRISE 0.96 0.96 100 100
6150 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Arrangement of drinking water supply in BARSHUL Water Testing Laboratory by sinking of 75 Mtr. Deep 40 x 100 mm. dia., with PVC pipe, DWP Tube wells in the district of Purba Bardhaman under Burdwan Division, PHE. Dte. AE(HQs) J.E. 2 BURDWAN ORD/000357/2023-2024 353/AE/HQ 18/07/2023 30 ANWESHA CONSTRUCTION 0.80 0.00 0 100
6151 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Arrangement of drinking water supply in GANGANANDAPUR Water Testing Laboratory by sinking of 75 Mtr. Deep 40 x 100 mm. dia., with PVC pipe, DWP Tube wells in the district of Purba Bardhaman under Burdwan Division, PHE. Dte. AE(HQs) J.E. 2 BURDWAN ORD/000359/2023-2024 355/AE/HQ 18/07/2023 30 DEBJYOTI GOSWAMI 0.96 0.95 98.96 100
6152 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP SALARY OF NGO LAB PERSONNEL FOR THE MONTH OF DECEMBER'2023. BILL/01366/2023-2024 1285/JJM 29/01/2024 AIKYATAN DEVELOPMENT SOCIETY 0.45 0.00 0 0
6153 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP SALARY OF NGO LAB PERSONNEL FOR THE MONTH OF DECEMBER'2023. BILL/01367/2023-2024 1286/JJM 29/01/2024 DR CHATTERJEES VILLAGE WELFARE SOCIETY 0.45 0.00 0 0
6154 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP SALARY OF NGO LAB PERSONNEL FOR THE MONTH OF DECEMBER'2023. BILL/01368/2023-2024 1287/JJM 29/01/2024 SHASTRI SMRITI SANGHA 0.45 0.00 0 0
6155 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Arrangement of drinking water supply in MONTESWAR Water Testing Laboratory by sinking of 75 Mtr. Deep 40 x 100 mm. dia., with PVC pipe, DWP Tube wells in the district of Purba Bardhaman under Burdwan Division, PHE. Dte. AE(HQs) J.E. 2 BURDWAN ORD/000362/2023-2024 358/AE/HQ 18/07/2023 30 SUPRIYA RAY 0.88 0.44 50 100
6156 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Arrangement of drinking water supply in SEHERA Water Testing Laboratory by sinking of 75 Mtr. Deep 40 x 100 mm. dia., with PVC pipe, DWP Tube wells in the district of Purba Bardhaman under Burdwan Division, PHE. Dte. AE(HQs) J.E. 2 BURDWAN,Junior Engineer, Burdwan Division ORD/000356/2023-2024 352/AE/HQ 18/07/2023 30 RUPALI ENTERPRISE 0.96 0.48 50 100
6157 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Maintenance charges bill for the period January to June 2023. BILL/01370/2023-2024 1376/JJM 21/02/2024 AIKYATAN DEVELOPMENT SOCIETY 0.40 0.00 0 0
6158 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Salary of NGO Lab Personnel for the month of January'2024. BILL/01699/2023-2024 1378/JJM 21/02/2024 SHASTRI SMRITI SANGHA 0.45 0.00 0 0
6159 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Maintenance charges bill for the month of January'23 to June'23. BILL/01369/2023-2024 1377/JJM 21/02/2024 SHASTRI SMRITI SANGHA 0.40 0.00 0 0
6160 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Salary of NGO Lab Personnel for the month of January'2024. BILL/01698/2023-2024 1379/JJM 21/02/2024 AIKYATAN DEVELOPMENT SOCIETY 0.45 0.00 0 0
6161 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Engagement of Laboratory personnel (Chemist/Bacteriologist and Lab Assistant) including maintenance in 2 Nos. Sub District Laboratories within Burdwan Sadar Sub Division under Burdwan Division, PHE Dte., Purba Bardhaman. [Period For Six Months i.e. 01.06.2023 to 30.11.2023]._2ND CALL. ORD/000163/2023-2024 2451/BWD 31/05/2023 180 DULAL MAJUMDER 6.99 0.00 0 100
6162 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Maintenance charges for the period July'23 to December'23. BILL/01911/2023-2024 1708/JJM 20/03/2024 SHASTRI SMRITI SANGHA 0.35 0.00 0 0
6163 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Maintenance charges for the period JANUARY'23 to DECEMBER'23. BILL/01912/2023-2024 1709-10/JJM 20/03/2024 DR CHATTERJEES VILLAGE WELFARE SOCIETY 0.75 0.00 0 0
6164 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Salary for the month of February'2024. BILL/01909/2023-2024 1712/JJM 20/03/2024 AIKYATAN DEVELOPMENT SOCIETY 0.45 0.00 0 0
6165 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Salary for the month of February'2024. BILL/01908/2023-2024 1711/JJM 20/03/2024 DR CHATTERJEES VILLAGE WELFARE SOCIETY 0.45 0.00 0 0
6166 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Salary for the month of February'2024. BILL/01910/2023-2024 1713/JJM 20/03/2024 SHASTRI SMRITI SANGHA 0.45 0.00 0 0
6167 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Continuation Work Order for Annual Maintenance Contract (AMC) for software upgradation and other software related issues in existing computers, refilling of Cartridge of the printers, replacement of battery of UPS in District, Sub-Dist. and NGO Laboratories under Burdwan Division, P.H.E. Dte. [Period from 01.08.2023 to 31.01.2024] AE(HQs) J.E. 1 BURDWAN ORD/000414/2023-2024 396/AE/HQ 27/07/2023 180 COMPUTER MEDIA 0.99 0.00 0 100
6168 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Salary of NGO Lab Personnel for the month of January'2024. BILL/01697/2023-2024 1380/JJM 21/02/2024 DR CHATTERJEES VILLAGE WELFARE SOCIETY 0.45 0.00 0 0
6169 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Continuation work order for "Engagement of laboratory personnel (Chemist , Bacteriologist and Lab Assistant) in Parulia Sub District Water Testing Laboratory & Kamalnagar WTP laboratory within Kalna Sub-Division under Burdwan Division, P.H.E. Dte., Purba Bardhaman. [Period from 01.05.2023 to 31.05.2023]" Assistant Engineer JUNIOR ENGINEER R.W.S. BURDWAN SUB-DIVISION PHE DTE ORD/000185/2023-2024 370/KSD 25/04/2023 31 SURATH DEY 0.59 0.00 0 0
6170 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Engagement of Laboratory personnel (Chemist/Bacteriologist and Lab Assistant) in 1 No. Sub District Laboratory (Banonabagram Sub District Laboratory) within Durgapur Sub Division under Burdwan Division, PHE Dte., Purba Bardhaman. [Period 01/08/2022 to 31/12/2023] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte JUNIOR ENGINEER DURGAPUR SUB-DIVISION PHE DTE,Junior Engineer1, Durgapur Sub-Division, PHE Dte. ORD/000309/2022-2023 463/DSD 29/07/2022 510 CLIFFORD FACILITY SERVICES PVT.LTD. 4.55 1.88 41.32 70
6171 PURBA BARDHAMAN Burdwan Division PROCUREMENT OF COMPUTER AND PERIPHERALS FOR THE DIFFERENT SUB DIVISION OFFICES AND BURDWAN DIVISION OFFICE PHE Dte , SM/16459 Support-MIS Supply of 02 Nos. HP Intel Core i5 windows 10 professional desktop computer.[GEM Invoice No.-GEM-28789462, DT.-13/03/2023] BILL/00086/2023-2024 190/JJM 31/05/2023 M/S S.S. INFOTECH 1.30 0.00 0 0
6172 PURBA BARDHAMAN Burdwan Division PROCUREMENT OF COMPUTER AND PERIPHERALS FOR THE DIFFERENT SUB DIVISION OFFICES AND BURDWAN DIVISION OFFICE PHE Dte , SM/16459 Support-MIS Procurement of materials from GEM (Invoice No.-GEM-29241467, dt.-20/03/2023, GEM-29240808, dt.-20/03/2023, GEM-28710492, dt.-11/03/2023) BILL/00125/2023-2024 250/JJM 14/06/2023 M/S S.S. INFOTECH 0.46 0.00 0 0
6173 PURBA BARDHAMAN Burdwan Division PROCUREMENT OF COMPUTER AND PERIPHERALS FOR THE DIFFERENT SUB DIVISION OFFICES AND BURDWAN DIVISION OFFICE PHE Dte , SM/16459 Support-MIS Procurement of materials from GEM (Canon Multifunction Machine) GEM Invoice No.-GEM-30301834, DT.-27/04/2023 BILL/00124/2023-2024 248/JJM 14/06/2023 IONET 3.75 0.00 0 0
6174 PURBA BARDHAMAN Burdwan Division PROCUREMENT OF COMPUTER AND PERIPHERALS FOR THE DIFFERENT SUB DIVISION OFFICES AND BURDWAN DIVISION OFFICE PHE Dte , SM/16459 Support-MIS Supply of tonner NPG-51 for Canon Photocopier Machine. BILL/00087/2023-2024 262/JJM 15/06/2023 ELECTRO SERVICES PVT LTD. 0.06 0.00 0 0
6175 PURBA BARDHAMAN Burdwan Division PROCUREMENT OF COMPUTER AND PERIPHERALS FOR THE DIFFERENT SUB DIVISION OFFICES AND BURDWAN DIVISION OFFICE PHE Dte , SM/16459 Support-MIS Procurement of materials from GEM (HP Intel Core i3 windows 11 Professional) GEM Invoice No.-GEM-30241483, dt.-24/04/2023 BILL/00123/2023-2024 247/JJM 14/06/2023 EASY DAY ENTERPRISE 4.47 0.00 0 0
6176 PURBA BARDHAMAN Burdwan Division PROCUREMENT OF COMPUTER AND PERIPHERALS FOR THE DIFFERENT SUB DIVISION OFFICES AND BURDWAN DIVISION OFFICE PHE Dte , SM/16459 Support-MIS Supply & delivery of computer monitor with necessary items at Durgapur (Burdwan North) Sub-Division and Headquarters, Burdwan Divn. under Burdwan Division, P.H.E. Dte. at PHE complex, Nababhat, Fagupur, Purba bardhaman-713104 J.E. 1 BURDWAN ORD/001057/2023-2024 147/AE/HQ 04/03/2024 15 HAZRA COMPUTER 1.00 0.00 0 100
6177 PURBA BARDHAMAN Burdwan Division PROCUREMENT OF COMPUTER AND PERIPHERALS FOR THE DIFFERENT SUB DIVISION OFFICES AND BURDWAN DIVISION OFFICE PHE Dte , SM/16459 Support-MIS Supply, delivery & Installation of CCTV Camera at Burdwan Division P.H.E. Dte. J.E. 1 BURDWAN ORD/001060/2023-2024 149/AE/HQ 04/03/2024 15 HAZRA COMPUTER 1.00 0.00 0 100
6178 PURBA BARDHAMAN Burdwan Division PROCUREMENT OF COMPUTER AND PERIPHERALS FOR THE DIFFERENT SUB DIVISION OFFICES AND BURDWAN DIVISION OFFICE PHE Dte , SM/16459 Support-MIS Supply & delivery of computer monitor with necessary items at Accounts Section under Burdwan Division, P.H.E. Dte. at PHE complex, Nababhat, Fagupur, Purba bardhaman-713104 J.E. 1 BURDWAN ORD/001058/2023-2024 148/AE/HQ 04/03/2024 15 HAZRA COMPUTER 1.00 0.00 0 100
6179 PURBA BARDHAMAN Burdwan Division PROCUREMENT OF COMPUTER AND PERIPHERALS FOR THE DIFFERENT SUB DIVISION OFFICES AND BURDWAN DIVISION OFFICE PHE Dte , SM/16459 Support-MIS Supply & delivery of computer peripheral items at Burdwan Division P.H.E. Dte. J.E. 1 BURDWAN ORD/001059/2023-2024 150/AE/HQ 04/03/2024 15 HAZRA COMPUTER 0.99 0.00 0 100
6180 PURBA BARDHAMAN Burdwan Division PROCUREMENT OF COMPUTER AND PERIPHERALS FOR THE DIFFERENT SUB DIVISION OFFICES AND BURDWAN DIVISION OFFICE PHE Dte , SM/16459 Support-MIS Procurement of computer peripheral through GEM (HP Desktop & HP Monitor)[08 Nos.] and HP Laserjet Printer [02 Nos.] BILL/02014/2023-2024 1921/JJM 30/03/2024 M/S S.S. INFOTECH 5.25 0.00 0 0
6181 PURBA BARDHAMAN Burdwan Division Drinking water sample collection & testing through Field Test Kits (FTKs Phase-II) & uploading charges for the same related to Water Quality Monitoring & Surveillance Programme under Jal Jeevan Mission , SM/19072 Support-WQMSP Carriage of FTK Box to different BMOH office under Burdwan Division, PHE. Dte. AE(HQs) J.E. 1 BURDWAN ORD/000140/2024-2025 308/AE/HQ 10/06/2024 10 KHUSI BHAKAT 0.29 0.00 0 100
6182 PURBA BARDHAMAN Burdwan Division Drinking water sample collection & testing through Field Test Kits (FTKs Phase-II) & uploading charges for the same related to Water Quality Monitoring & Surveillance Programme under Jal Jeevan Mission , SM/19072 Support-WQMSP Engagement of ASHA as FTK User for Water Quality Monitoring and Surveillance of Rural Drinking Water Supply BILL/01230/2024-2025 1260/JJM 24/01/2025 CHIEF MEDICAL OFFICER OF HEALTH (CMOH) 50.31 0.00 0 null
6183 PURBA BARDHAMAN Burdwan Division Drinking water sample collection & testing through Field Test Kits (FTKs Phase-II) & uploading charges for the same related to Water Quality Monitoring & Surveillance Programme under Jal Jeevan Mission , SM/19072 Support-WQMSP Uploading charges of all collected & tested data management to State WQ Dashboard using FTK/H2S vials for FHTCs in Burdwan district related to Water Quality Monitoring & Surveillance Activities under Jal Jeevan Mission. J.E. 1 BURDWAN ORD/001296/2024-2025 353/AE/HQ 10/03/2025 30 ALAKA GHOSH 4.65 0.00 0 0
6184 PURBA BARDHAMAN Central Mechanical Procurement of Computer and Peripherals for the office use in Central Mechanical Division, Central Mechanical Sub-Division, Bardhaman Mechanical Sub-Division(Drilling) PHE.Dte. , SM/13017 Support-MIS Procurement of Computer and peripherals for office use of Central Mechanical Division, PHE.Dte. BILL/00012/2022-2023 29 18/01/2023 IONET 13.47 0.00 0 0
6185 PURBA BARDHAMAN Burdwan Division IEC Activities related to judicious & safe use of drinking water, water conservation, water quality issues under JJM support activities , SM/19094 Support-IEC Organize one day Sub Division level orientation programme on JJM at involving PRI Functionaries and VWSC members at Purba Bardhaman and Conceptualization, design, implementing implementation of community sensitization / mobilization activities through Wall Painting on legal provision damage or illegal connection of PWSS; safe handling & storage of safe water Quality issues, water conservation and WASH related issues as per guideline of JJM at Purba Bardhaman under Burdwan Division, PHE Dte, Govt. of West Bengal. AE(HQs) J.E. 1 BURDWAN ORD/001050/2023-2024 788/BWD 27/02/2024 60 TUBGRAM GRAMMYAK UNNAYAN SAMITY 20.68 0.00 0 0
6186 PURBA BARDHAMAN Burdwan Division IEC Activities related to judicious & safe use of drinking water, water conservation, water quality issues under JJM support activities , SM/19094 Support-IEC Arrangement of different items required in DWSM (District Water and Sanitation Mission) meeting and training program on "Good Chlorine Practice & Analysis of Chlorine Demand & Chlorine available in disinfectants" under Burdwan Division, P.H.E. Dte. AE(HQs) J.E. 1 BURDWAN ORD/000274/2024-2025 310/AE/HQ 10/06/2024 15 HAZRA COMPUTER 0.58 0.00 0 100
6187 PURBA BARDHAMAN Burdwan Division IEC Activities related to judicious & safe use of drinking water, water conservation, water quality issues under JJM support activities , SM/19094 Support-IEC Organize IEC activities and Block Level Orientation programme on JJM at Purba Bardhaman and Flex tagging(Scheme information), Wall Painting & Har Ghar Jal Logo , Light Board; Conceptualization, design and implementing mass awareness generation through Tableau & Miking, Local News Channel, Printing & Supply Of IEC Banner & leaflets by dissemination of awareness generation IEC messages regarding JJM/FHTC, Prevention of illegal connection or damages of PWSS; safe handling & storage of safe water Quality issues, water conservation and wash related issues as per guideline of JJM in different place of Gram Panchayets. AE(HQs),Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000427/2024-2025 3056/BWD 06/08/2024 60 TUBGRAM GRAMMYAK UNNAYAN SAMITY 30.40 0.00 0 100
6188 PURBA BARDHAMAN Burdwan Division IEC Activities related to judicious & safe use of drinking water, water conservation, water quality issues under JJM support activities , SM/19094 Support-IEC Conceptualization, design and implementing mass awareness generation through Tableau and using Bus Panel advisement at Purba Bardhaman and printing & Supply 6 types of IEC leaflets & banner for distribution on FHTC, Provision on legal provision damage or illegal connection of PWSS; safe handling & storage of safe Water Quality issues, water conservation and WASH related issues as per guideline of JJM and preparation of web based Digital (A/V) awareness generation cum training material (Bengali) with voice over showcasing IEC and HRD initiative at Purba Bardhaman under Burdwan Division, PHE Dte, Govt. of West Bengal. AE(HQs) J.E. 1 BURDWAN ORD/001049/2023-2024 787/BWD 27/02/2024 360 DEBNATH BROTHERS 22.72 0.00 0 100
6189 PURBA BARDHAMAN Burdwan Division Survey and Water Sample Collection of Schools and Anganwari Centers through customised mobile application and data entry in IMIS within Purba Bardhaman District under Burdwan Division, PHE Dte. , SM/08997 Support-M&E Survey and Collection of data through mobile application regarding availability of drinking water, sanitation facilities and other parameters in Primary & Upper Primary Schools, Anganwadi Centers under Katwa -I , Katwa- II , Ketugram-I, Ketugram-II and Mongalkote Block within Purba Bardhaman District under Katwa Sub-Division under Burdwan Division, PHE Dte (Sl No-1) Assistant Engineer Junior Engineer, R.W.S., Katwa-I Dev. Block ORD/000968/2020-2021 314/A/KTS 09/11/2020 100 GHOSH CONSTRUCTION 2.47 2.47 100 0
6190 PURBA BARDHAMAN Burdwan Division Survey and Water Sample Collection of Schools and Anganwari Centers through customised mobile application and data entry in IMIS within Purba Bardhaman District under Burdwan Division, PHE Dte. , SM/08997 Support-M&E Survey and collection of data through mobile application regarding availability of drinking water, sanitation, facilities and other parameters in Primary & Upper Primary schools, Anganwari Centres under Burdwan-I, Burdwan-II, Raina-II, Memari-I, Memari-II, Jamalpur & Khandaghosh Block within Purba Bardhaman District under Burdwan Division, PHE Dte. ORD/000983/2020-2021 1031/BSD 13/11/2020 90 ALAKA GHOSH 3.27 2.34 71.56 0
6191 PURBA BARDHAMAN Burdwan Division Survey and Water Sample Collection of Schools and Anganwari Centers through customised mobile application and data entry in IMIS within Purba Bardhaman District under Burdwan Division, PHE Dte. , SM/08997 Support-M&E Survey and collection of data through mobile application regarding availability of drinking water, sanitation facilities and other parameters in Primary & Upper Primary schools, Anganwari Centres under Kalna-I, Kalna-II, Purbasthali-I, Purbasthali-II and Monteswar Block within Purba Bardhaman District under Burdwan Division, PHE Dte. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/001338/2020-2021 767/KSD 27/11/2020 100 SETH ENTERPRISE 1.46 1.46 100 0
6192 PURBA BARDHAMAN Burdwan Division Survey and Water Sample Collection of Schools and Anganwari Centers through customised mobile application and data entry in IMIS within Purba Bardhaman District under Burdwan Division, PHE Dte. , SM/08997 Support-M&E Designing, Making and Erection of Sign Board for SAJAL GRAM in Samaspur Village, Monteswar Block within Lohana PWSS under Burdwan Division, PHE Dte. (5 Nos Board) J.E. 1 BURDWAN ORD/001076/2023-2024 829/AE/HQ 30/10/2023 30 ISHAN CONSTRUCTION 0.76 0.00 0 100
6193 PURBA BARDHAMAN Burdwan Division Survey and Water Sample Collection of Schools and Anganwari Centers through customised mobile application and data entry in IMIS within Purba Bardhaman District under Burdwan Division, PHE Dte. , SM/08997 Support-M&E Designing, Making and Erection of Sign Board for SAJAL GRAM in Takipur Village, Ausgram-I Block within Takipur PWSS under Burdwan Division, PHE Dte. (5 Nos Board) J.E. 1 BURDWAN ORD/001077/2023-2024 824/AE/HQ 30/10/2023 30 ISHAN CONSTRUCTION 0.76 0.00 0 100
6194 PURBA BARDHAMAN Burdwan Division Survey and Water Sample Collection of Schools and Anganwari Centers through customised mobile application and data entry in IMIS within Purba Bardhaman District under Burdwan Division, PHE Dte. , SM/08997 Support-M&E Designing, Making and Erection of Sign Board for SAJAL GRAM in Chonari Village, Ausgram-I Block within Takipur PWSS under Burdwan Division, PHE Dte. (5 Nos Board) J.E. 1 BURDWAN ORD/001078/2023-2024 822/AE/HQ 30/10/2023 30 ISHAN CONSTRUCTION 0.76 0.00 0 100
6195 PURBA BARDHAMAN Burdwan Division Survey and Water Sample Collection of Schools and Anganwari Centers through customised mobile application and data entry in IMIS within Purba Bardhaman District under Burdwan Division, PHE Dte. , SM/08997 Support-M&E Designing, Making and Erection of Sign Board for SAJAL GRAM in Jarul Village, Khandaghosh Block within Taraposh PWSS under Burdwan Division, PHE Dte. (5 Nos Board) J.E. 1 BURDWAN ORD/001112/2023-2024 868/AE/HQ 07/11/2023 30 PAPRI HAZRA 0.76 0.00 0 100
6196 PURBA BARDHAMAN Burdwan Division Survey and Water Sample Collection of Schools and Anganwari Centers through customised mobile application and data entry in IMIS within Purba Bardhaman District under Burdwan Division, PHE Dte. , SM/08997 Support-M&E Designing, Making and Erection of Sign Board for SAJAL GRAM in Chalbalpur Village, Jamalpur Block within Chak Sanjadi PWSS under Burdwan Division, PHE Dte. (5 Nos Board) J.E. 1 BURDWAN ORD/001113/2023-2024 874/AE/HQ 07/11/2023 30 PAPRI HAZRA 0.76 0.00 0 100
6197 PURBA BARDHAMAN Burdwan Division Survey and Water Sample Collection of Schools and Anganwari Centers through customised mobile application and data entry in IMIS within Purba Bardhaman District under Burdwan Division, PHE Dte. , SM/08997 Support-M&E Designing, Making and Erection of Sign Board for SAJAL GRAM in Paschim Memari Village, Memari - I Block within Nabagram PWSS under Burdwan Division, PHE Dte. (5 Nos Board) AE(HQs) J.E. 1 BURDWAN ORD/001197/2023-2024 865/AE/HQ 06/11/2023 30 MANABSEBA PROKALPA & CONSTRUCTIONS 0.75 0.00 0 100
6198 PURBA BARDHAMAN Burdwan Division Survey and Water Sample Collection of Schools and Anganwari Centers through customised mobile application and data entry in IMIS within Purba Bardhaman District under Burdwan Division, PHE Dte. , SM/08997 Support-M&E Designing, Making and Erection of Sign Board for SAJAL GRAM in Pingur Village, Memari - I Block within Nabagram PWSS under Burdwan Division, PHE Dte. (5 Nos Board) AE(HQs) J.E. 1 BURDWAN ORD/001198/2023-2024 864/AE/HQ 06/11/2023 30 MANABSEBA PROKALPA & CONSTRUCTIONS 0.75 0.00 0 100
6199 PURBA BARDHAMAN Burdwan Division Survey and Water Sample Collection of Schools and Anganwari Centers through customised mobile application and data entry in IMIS within Purba Bardhaman District under Burdwan Division, PHE Dte. , SM/08997 Support-M&E Supply, fitting & fixing of Har Ghar Jal Logo and Wall painting of Scheme detailing of Nabagram & Kulingram Piped W/S. Scheme under Jamalpur Block under Burdwan Division, PHE. Dte. AE(HQs) J.E. 1 BURDWAN ORD/001200/2023-2024 912/AE/HQ 29/11/2023 10 MANABSEBA PROKALPA & CONSTRUCTIONS 1.00 0.00 0 100
6200 PURBA BARDHAMAN Burdwan Division Survey and Water Sample Collection of Schools and Anganwari Centers through customised mobile application and data entry in IMIS within Purba Bardhaman District under Burdwan Division, PHE Dte. , SM/08997 Support-M&E Designing, Making and Erection of Sign Board for SAJAL GRAM in Konarpara Village, Memari - I Block within Nabagram PWSS under Burdwan Division, PHE Dte. (5 Nos Board) AE(HQs) J.E. 1 BURDWAN ORD/001199/2023-2024 858/AE/HQ 06/11/2023 30 MANABSEBA PROKALPA & CONSTRUCTIONS 0.75 0.00 0 100
6201 PURBA BARDHAMAN Burdwan Division Consultancy Service for making DPR to implement New Piped Water Supply Scheme (MVS) within the Purba Bardhaman District. , SM/11993 Support-M&E Preparation & Submission of DPR for New Water Supply Scheme under JAMALPUR Development Block under Burdwan Division, P.H.E. Dte. [Gr. A] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000463/2022-2023 3901/BWD 08/09/2022 45 APEX ENGINEERING 8.83 6.18 69.99 0
6202 PURBA BARDHAMAN Burdwan Division Consultancy Service for making DPR to implement New Piped Water Supply Scheme (MVS) within the Purba Bardhaman District. , SM/11993 Support-M&E Preparation of piped network system & design the same including Route Survey using DGPS & all related field work for technical data and JJM compliant data collection preparation and supply of Geo reference drawing (CAD-GIS) layout of plan of the zone wise command area of water distribution and transmission network (WD & TN) Showing all requisite design physical features including cost and estimate of different real component of PWSS like OHR, TW, PUMP HOUSE, B/W electronica component etc. including preparation and submission of DPR booklet of PWSS all complete in consultation with PHED Planning Wings and clearance from SLSSC including preparation of bid documents in different PWSS of uncovered area within Ausgram II, Galsi I & Bhatar Dev. Block under Durgapur (Burdwan North) Sub-Division under Purba Bardhaman. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000471/2022-2023 3825/BWD 02/09/2022 60 SRIJAN ECOLOGICAL UPLIFTMENT PVT LTD. 225.00 221.17 98.3 0
6203 PURBA BARDHAMAN Burdwan Division Consultancy Service for making DPR to implement New Piped Water Supply Scheme (MVS) within the Purba Bardhaman District. , SM/11993 Support-M&E Preparation & Submission of DPR for New Water Supply Scheme under KETUGRAM - I Development Block under Burdwan Division, P.H.E. Dte. [Gr. A] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000511/2022-2023 3972/BWD 13/09/2022 45 ENVIROTECH SOLUTIONS 60.07 54.11 90.08 0
6204 PURBA BARDHAMAN Burdwan Division Consultancy Service for making DPR to implement New Piped Water Supply Scheme (MVS) within the Purba Bardhaman District. , SM/11993 Support-M&E Preparation & Submission of DPR for New Water Supply Scheme under KETUGRAM - II Development Block under Burdwan Division, P.H.E. Dte. [Gr. B] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000512/2022-2023 3988/BWD 13/09/2022 45 ENVIROTECH SOLUTIONS 30.03 26.56 88.44 0
6205 PURBA BARDHAMAN Burdwan Division Consultancy Service for making DPR to implement New Piped Water Supply Scheme (MVS) within the Purba Bardhaman District. , SM/11993 Support-M&E Preparation of piped network system & design the same including Route Survey using DGPS & all related field work for technical data and JJM compliant data collection preparation and supply of Geo reference drawing (CAD-GIS) layout of plan of the zone wise command area of water distribution and transmission network (WD & TN) Showing all requisite design physical features including cost and estimate of different real component of PWSS like OHR, TW,PUMP HOUSE, B/W electronica component etc. including preparation and submission of DPR booklet of PWSS all complete in consultation with PHED Planning Wings and clearance from SLSSC including preparation of bid documents in different PWSS of uncovered area within Mongalkote Dev. Block under Katwa Sub-Division under Purba Bardhaman. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000488/2022-2023 3931/BWD 09/09/2022 60 RUDRABHISHEK ENTERPRISES LIMITED 90.00 88.45 98.28 0
6206 PURBA BARDHAMAN Burdwan Division Consultancy Service for making DPR to implement New Piped Water Supply Scheme (MVS) within the Purba Bardhaman District. , SM/11993 Support-M&E Work Order for Service for land acquisition for different PWSS under JJM of Purbasthali-I block under Kalna Sub-Division, PHE Dte. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000341/2023-2024 519/KSD 06/06/2023 365 PARTHA PRATIM ACHARYA 0.81 0.41 50.62 100
6207 PURBA BARDHAMAN Burdwan Division Consultancy Service for making DPR to implement New Piped Water Supply Scheme (MVS) within the Purba Bardhaman District. , SM/11993 Support-M&E Preparation of piped network system & design the same including Route Survey using DGPS & all related field work for technical data and JJM compliant data collection preparation and supply of Geo reference drawing (CAD-GIS) layout of plan of the zone wise command area of water distribution and transmission network (WD & TN) Showing all requisite design physical features including cost and estimate of different real component of PWSS like OHR, TW, PUMP HOUSE, B/W electronica component etc. including preparation and submission of DPR booklet of PWSS all complete in consultation with PHED Planning Wings and clearance from SLSSC including preparation of bid documents in different PWSS of uncovered area within Burdwan II, Khandaghosh, Memari I & Raina II Dev. Block, under Burdwan Sub-Division under Purba Bardhaman. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000472/2022-2023 3841/BWD 05/09/2022 60 MARS PLANNING AND ENGINEERING SERVICES PVT LTD. 300.00 230.27 76.76 100
6208 PURBA BARDHAMAN Burdwan Division Consultancy Service for making DPR to implement New Piped Water Supply Scheme (MVS) within the Purba Bardhaman District. , SM/11993 Support-M&E Preparation & Submission of DPR for New Water Supply Scheme under PURBASTHALI - I Development Block under Burdwan Division, P.H.E. Dte. [Gr. C] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000513/2022-2023 4056/BWD 15/09/2022 45 ECO CARE 60.07 42.03 69.97 100
6209 PURBA BARDHAMAN Burdwan Division Consultancy Service for making DPR to implement New Piped Water Supply Scheme (MVS) within the Purba Bardhaman District. , SM/11993 Support-M&E Preparation & Submission of DPR for New Water Supply Scheme under PURBASTHALI - II Development Block under Burdwan Division, P.H.E. Dte. [Gr. D] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000514/2022-2023 4079/BWD 16/09/2022 45 ECO CARE 6.76 3.89 57.54 100
6210 PURBA BARDHAMAN Burdwan Division Consultancy Service for making DPR to implement New Piped Water Supply Scheme (MVS) within the Purba Bardhaman District. , SM/11993 Support-M&E Preparation of piped network system & design the same including Route Survey using DGPS & all related field work for technical data and JJM compliant data collection preparation and supply of Geo reference drawing (CAD-GIS) layout of plan of the zone wise command area of water distribution and transmission network (WD & TN) Showing all requisite design physical features including cost and estimate of different real component of PWSS like OHR, TW,PUMP HOUSE, B/W electronica component etc. including preparation and submission of DPR booklet of PWSS all complete in consultation with PHED Planning Wings and clearance from SLSSC including preparation of bid documents in different PWSS of uncovered area within Kalna I & Monteswar Dev. Block under Kalna Sub-Division under Purba Bardhaman. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000487/2022-2023 3956/BWD 09/09/2022 60 VENKATESHWARA ENTERPRISES 180.00 141.39 78.55 100
6211 PURBA BARDHAMAN Burdwan Division Consultancy Service for making DPR to implement New Piped Water Supply Scheme (MVS) within the Purba Bardhaman District. , SM/11993 Support-M&E Continuation Work for Preparation & Submission of DPR for New Water Supply Scheme under KETUGRAM - I Development Block under Burdwan Division, P.H.E. Dte. ORD/000920/2022-2023 4636/BWD 17/10/2022 45 ENVIROTECH SOLUTIONS 17.27 0.00 0 100
6212 PURBA BARDHAMAN Burdwan Division Consultancy Service for making DPR to implement New Piped Water Supply Scheme (MVS) within the Purba Bardhaman District. , SM/11993 Support-M&E Work Order for Service for land acquisition for different PWSS under JJM of Monteswar block under Kalna Sub-Division, PHE Dte. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000343/2023-2024 535/KSD 07/06/2023 365 PARTHA PRATIM ACHARYA 0.81 0.00 0 42
6213 PURBA BARDHAMAN Burdwan Division ADDITIONAL COST TOWARDS CONSULTANCY SERVICE FOR MAKING DPR TO IMPLEMENT NEW PIPED WATER SUPPLY SCHEME (MVS) WITHIN THE PURBA BARDHAMAN DISTRICT , SM/14441 Support-M&E Continuation work order for Preparation of piped network system & design the same including Route Survey using DGPS & all related field work for technical data and JJM compliant data collection preparation and supply of Geo reference drawing (CAD-GIS) layout of plan of the zone wise command area of water distribution and transmission network (WD & TN) Showing all requisite design physical features including cost and estimate of different real component of PWSS like OHR, TW, PUMP HOUSE, B/W electronica component etc. including preparation and submission of DPR booklet of PWSS all complete in consultation with PHED Planning Wings and clearance from SLSSC including preparation of bid documents in different PWSS of uncovered area within Ausgram I & II and Galsi I & II Dev. Block under Durgapur (Burdwan North) Sub-Division under Purba Bardhaman. ORD/000718/2022-2023 333/BWD 24/01/2023 60 SRIJAN ECOLOGICAL UPLIFTMENT PVT LTD. 170.00 169.01 99.42 0
6214 PURBA BARDHAMAN Burdwan Division ADDITIONAL COST TOWARDS CONSULTANCY SERVICE FOR MAKING DPR TO IMPLEMENT NEW PIPED WATER SUPPLY SCHEME (MVS) WITHIN THE PURBA BARDHAMAN DISTRICT , SM/14441 Support-M&E Continuation work for Preparation of piped network system & design the same including Route Survey using DGPS & all related field work for technical data and JJM compliant data collection preparation and supply of Geo reference drawing (CAD-GIS) layout of plan of the zone wise command area of water distribution and transmission network (WD & TN) Showing all requisite design physical features including cost and estimate of different real component of PWSS like OHR, TW,PUMP HOUSE, B/W electronica component etc. including preparation and submission of DPR booklet of PWSS all complete in consultation with PHED Planning Wings and clearance from SLSSC including preparation of bid documents in different PWSS of uncovered area within Mongalkote Dev. Block under Katwa Sub-Division under Purba Bardhaman. Assistant Engineer JUNIOR ENGINEER KATWA SUB-DIVISION PHE DTE ORD/000727/2022-2023 341/BWD 27/01/2023 60 RUDRABHISHEK ENTERPRISES LIMITED 65.00 60.65 93.31 0
6215 PURBA BARDHAMAN Burdwan Division ADDITIONAL COST TOWARDS CONSULTANCY SERVICE FOR MAKING DPR TO IMPLEMENT NEW PIPED WATER SUPPLY SCHEME (MVS) WITHIN THE PURBA BARDHAMAN DISTRICT , SM/14441 Support-M&E Continuation work for Preparation of piped network system & design the same including Route Survey using DGPS & all related field work for technical data and JJM compliant data collection preparation and supply of Geo reference drawing (CAD-GIS) layout of plan of the zone wise command area of water distribution and transmission network (WD & TN) Showing all requisite design physical features including cost and estimate of different real component of PWSS like OHR, TW,PUMP HOUSE, B/W electronica component etc. including preparation and submission of DPR booklet of PWSS all complete in consultation with PHED Planning Wings and clearance from SLSSC including preparation of bid documents in different PWSS of uncovered area within Kalna II Dev. Block under Kalna Sub-Division under Purba Bardhaman. ORD/000731/2022-2023 342/BWD 27/01/2023 60 VENKATESHWARA ENTERPRISES 27.00 22.37 82.85 70
6216 PURBA BARDHAMAN Burdwan Division ADDITIONAL COST TOWARDS CONSULTANCY SERVICE FOR MAKING DPR TO IMPLEMENT NEW PIPED WATER SUPPLY SCHEME (MVS) WITHIN THE PURBA BARDHAMAN DISTRICT , SM/14441 Support-M&E Continuation work for Preparation of piped network system & design the same including Route Survey using DGPS & all related field work for technical data and JJM compliant data collection preparation and supply of Geo reference drawing (CAD-GIS) layout of plan of the zone wise command area of water distribution and transmission network (WD & TN) Showing all requisite design physical features including cost and estimate of different real component of PWSS like OHR, TW,PUMP HOUSE, B/W electronica component etc. including preparation and submission of DPR booklet of PWSS all complete in consultation with PHED Planning Wings and clearance from SLSSC including preparation of bid documents in different PWSS of uncovered area within Katwa I & II Dev. Block under Katwa Sub-Division under Purba Bardhaman. Assistant Engineer JUNIOR ENGINEER KATWA SUB-DIVISION PHE DTE ORD/000726/2022-2023 325/BWD 20/01/2023 60 VENKATESHWARA ENTERPRISES 175.00 144.27 82.44 100
6217 PURBA BARDHAMAN Burdwan Division ADDITIONAL COST TOWARDS CONSULTANCY SERVICE FOR MAKING DPR TO IMPLEMENT NEW PIPED WATER SUPPLY SCHEME (MVS) WITHIN THE PURBA BARDHAMAN DISTRICT , SM/14441 Support-M&E Continuation work for Preparation of piped network system & design the same including Route Survey using DGPS & all related field work for technical data and JJM compliant data collection preparation and supply of Geo reference drawing (CAD-GIS) layout of plan of the zone wise command area of water distribution and transmission network (WD & TN) Showing all requisite design physical features including cost and estimate of different real component of PWSS like OHR, TW, PUMP HOUSE, B/W electronica component etc. including preparation and submission of DPR booklet of PWSS all complete in consultation with PHED Planning Wings and clearance from SLSSC including preparation of bid documents in different PWSS of uncovered area within Burdwan ¿ I, Memari ¿ II & Raina ¿ I Dev. Block, under Burdwan Sub-Division under Purba Bardhaman. ORD/000725/2022-2023 334/BWD 24/01/2023 60 MARS PLANNING AND ENGINEERING SERVICES PVT LTD. 215.00 31.17 14.5 100
6218 PURBA BARDHAMAN Burdwan Division Annual Procurement of Chemicals, Consumables and Glassware for water testing Laboratories. , SM/06624 Support-WQMSP Supply & Delivery of Chemicals, reagents and consumables for 14 (Fourteen) Nos. laboratories under Burdwan Division, PHE Dte. (Tr No.-212/BWD/20-21) AE(HQs) J.E. 2 BURDWAN ORD/000057/2020-2021 3362/BWD 21/09/2020 20 NATURAL RESOURCES CONSORTIUM 25.22 25.22 100 0
6219 PURBA BARDHAMAN Burdwan Division Annual Procurement of Chemicals, Consumables and Glassware for water testing Laboratories. , SM/06624 Support-WQMSP Procurement of consumables for OMAS for different Sub-District Laboratories under Burdwan Division, PHE Dte. [Gr.-A] AE(HQs) J.E. 2 BURDWAN ORD/000762/2020-2021 1265/AE/HQ 26/02/2021 7 SUNANDA ENVIROMENTAL INTERNATIONAL PVT LTD. 4.72 4.72 100 0
6220 PURBA BARDHAMAN Burdwan Division Annual Procurement of Chemicals, Consumables and Glassware for water testing Laboratories. , SM/06624 Support-WQMSP Supply & Delivery of Chemicals, reagents and consumables for 14 (Fourteen) laboratories under Burdwan Division, P.H.E. Dte. AE(HQs) J.E. 2 BURDWAN ORD/000092/2021-2022 3468/BWD 29/06/2021 20 NATURAL RESOURCES CONSORTIUM 22.49 12.69 56.43 0
6221 PURBA BARDHAMAN Burdwan Division Annual Procurement of Chemicals, Consumables and Glassware for water testing Laboratories. , SM/06624 Support-WQMSP Supply & delivery of Residual Chlorine Kit and DPD Tablet for 14 (Fourteen) Nos Laboratories under Burdwan Division, PHE Dte.[Gr.-B] AE(HQs) J.E. 2 BURDWAN ORD/000151/2021-2022 1579/AE/HQ 14/07/2021 7 COMPUTER MEDIA 4.22 4.22 100 0
6222 PURBA BARDHAMAN Burdwan Division Procurement of equipments, glassware and chemicals required for NABL Accreditation of the District Laboratory, Nababhat under Burdwan Division. , SM/09241 Support-WQMSP Procurement of Equipment's, Glassware and Chemicals required for NABL accreditation of the District Laboratory at Nababhat under Burdwan Division, PHE Dte._2nd Call. AE(HQs) J.E. 2 BURDWAN ORD/000763/2021-2022 6769/BWD 03/12/2021 20 LAB SOLUTION 9.15 8.48 92.68 0
6223 PURBA BARDHAMAN Burdwan Division Procurement of equipments, glassware and chemicals required for NABL Accreditation of the District Laboratory, Nababhat under Burdwan Division. , SM/09241 Support-WQMSP Supply & Delivery of Chemicals, reagents and consumables at District Laboratory and 8 (Eight) Sub-District laboratories for NABL accreditation under Burdwan Division, P.H.E. Dte._Group : A AE(HQs) J.E. 2 BURDWAN ORD/000075/2022-2023 290/AE/HQ 17/05/2022 7 LAB SOLUTION 4.23 4.23 100 0
6224 PURBA BARDHAMAN Burdwan Division Procurement of equipments, glassware and chemicals required for NABL Accreditation of the District Laboratory, Nababhat under Burdwan Division. , SM/09241 Support-WQMSP Supply & installation of approved quality Curtain with fixing of other allied works for NABL recognition of District Laboratory, Nababhat PHE Complex under Burdwan Divn., PHE. Dte. [Group : E] AE(HQs) J.E. 2 BURDWAN ORD/000735/2021-2022 160/AE/HQ 17/03/2022 10 BHARAT CONSTRUCTION 0.79 0.79 100 0
6225 PURBA BARDHAMAN Burdwan Division Procurement of equipments, glassware and chemicals required for NABL Accreditation of the District Laboratory, Nababhat under Burdwan Division. , SM/09241 Support-WQMSP Sanction order for deposit of Final assessment fee for NABL Accreditation of Burdwan District Laboratory under Burdwan Division, PHE Dte. ORD/000508/2022-2023 877/BSD 24/05/2022 90 ALAKA GHOSH 0.25 0.00 0 0
6226 PURBA BARDHAMAN Burdwan Division Procurement of equipments, glassware and chemicals required for NABL Accreditation of the District Laboratory, Nababhat under Burdwan Division. , SM/09241 Support-WQMSP Sanction order for deposit of annual accreditation fee for NABL Accreditation of Burdwan District Laboratory under Burdwan Division, PHE Dte. ORD/000506/2022-2023 1005/BSD 17/06/2022 90 ALAKA GHOSH 0.28 0.00 0 0
6227 PURBA BARDHAMAN Burdwan Division Procurement of equipments, glassware and chemicals required for NABL Accreditation of the District Laboratory, Nababhat under Burdwan Division. , SM/09241 Support-WQMSP Hire charges of 62.5 KVA Diesel Generator set for District Laboratory NABL Audit purpose including engagement one operator Technician and Diesel (8lit/hour) and all other incidental charges. BILL/00515/2024-2025 690/JJM 14/08/2024 KHUSI BHAKAT 0.08 0.00 0 null
6228 PURBA BARDHAMAN Burdwan Division Procurement of equipments, glassware and chemicals required for NABL Accreditation of the District Laboratory, Nababhat under Burdwan Division. , SM/09241 Support-WQMSP Providing NABL related expenses for renewal audit of Burdwan District Water testing Laboratory under Burdwan Division, PHE Dte. Contractual Junior Engineer,Junior Engineer, R.W.S. Burdwan Sub Division, P.H.E. Dt ORD/000001/2024-2025 145/RWS 18/04/2024 7 BHARATI CHEMICAL AND SCIENTIFIC WORKS 1.28 0.00 0 100
6229 PURBA BARDHAMAN Burdwan Division Procurement of equipments, glassware and chemicals required for NABL Accreditation of the District Laboratory, Nababhat under Burdwan Division. , SM/09241 Support-WQMSP Calibration of Equipment/Glassware for Burdwan District Water Testing laboratory under Burdwan Division, PHE Dte. (Part-A) Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000863/2022-2023 1622/BSD 16/09/2022 3 MEASURE & PRECISION ENGINEERS 0.15 0.00 0 100
6230 PURBA BARDHAMAN Burdwan Division Procurement of equipments, glassware and chemicals required for NABL Accreditation of the District Laboratory, Nababhat under Burdwan Division. , SM/09241 Support-WQMSP Calibration of Equipment/Glassware for Burdwan District Water Testing laboratory under Burdwan Division,PHE Dte. (Part-B) Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000864/2022-2023 1623/BSD 16/09/2022 3 MEASURE & PRECISION ENGINEERS 0.12 0.00 0 100
Total 6,22,052.7551,462.198.27 