List of issued work order
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
5035 5,20,069.82 1,00,257.21 19.28  
1 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Natungram Piped Water Supply Scheme , SM/06970 Retrofitting Continuation work order for Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Amar village of Natungram piped water supply scheme within Burdwan Sub-Division under Burdwan Division, PHE Dte. [Phase-I](Tr No.-579/BWD/2020-21) Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000263/2020-2021 4465/BWD 11/11/2020 30 BAMDEB CONSTRUCTION & CO 4.92 9.84 200 1
2 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Natungram Piped Water Supply Scheme , SM/06970 Retrofitting Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of Natungram Piped Water Supply Scheme at Amar (6 Nos Habitation Part), Natungram (4 Nos Habitation Part) & Bohar Village (Mouza), Bardhaman-I Block under Burdwan Division, PHE Dte.(Agreement No. 73/2020-2021 OF SE/CC/PHE. DTE.) Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000140/2020-2021 7052/BWD 22/12/2020 90 HAMID SK 48.20 82.80 171.78 1
3 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Natungram Piped Water Supply Scheme , SM/06970 Retrofitting Providing Functional House hold Tap connection (FHTC) from existing distribution system within the command area of NATUNGRAM piped water supply scheme at Natungram village under Bardhaman-I Block under Burdwan Division, PHE Dte.[Gr.-C] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000152/2021-2022 687/BSD 09/06/2021 30 HAMID SK 2.95 5.81 196.95 1
4 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Natungram Piped Water Supply Scheme , SM/06970 Retrofitting Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Amra village of Natungram piped water supply scheme within Burdwan Sub-Division under Burdwan Division, PHE Dte. [Phase-I](Tr No.-332/BWD/2020-21) ORD/000079/2020-2021 2732/BWD 10/08/2020 30 BAMDEB CONSTRUCTION & CO 4.92 9.84 200 1
5 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Natungram Piped Water Supply Scheme , SM/06970 Retrofitting Publication charges bill for the office of the Executive Engineer, Burdwan Division, PHE Dte.[Invoice No.-BCWB20RV-0001293, dt.-19/05/20, BCWB20RV-0001770, dt.-31/05/20, BCWB20RV-0001920, dt.-05/06/20, BCWB20RV-0001860, dt.-03/06/20, BCWB20RV-0001861, dt.-03/06/20, BCWB20RV-0001928, dt.-05/06/20, BCWB20RV-0001820, dt.-03/06/20, BCWB19RV-0059455, dt.-20/03/20, BCWB19RV-0059454. dt.-20/03/20, BCWB19RV-0057682, dt.-12/03/20, BCWB20RV-0003210, dt.-26/06/20, BCWB20RV-0000918, dt.-07/05/20, BCWB20RV-0001352, dt.-22/05/20, BCWB19RV-0050592, dt.-30/01/20] VCH/000411/2022-2023 240/DW/22-23 04/07/2022 0 BENNETT COLEMAN & COMPANY LIMITED 1.89 0.00 0 0
6 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Natungram Piped Water Supply Scheme , SM/06970 Retrofitting Providing leftout water tap connection in different villages for 100% coverage to make it Sajal Gram from existing distribution system within scheme jurisdiction of different Piped Water Supply Schemes within Burdwan ¿ I Block under Burdwan Division, PHE. Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000342/2021-2022 32/BWD 04/01/2022 30 ROY BISWAS CONSTRUCTION 9.89 4.90 49.54 1
7 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Natungram Piped Water Supply Scheme , SM/06970 Retrofitting Providing 45 Nos.FHTC at SIJEPARA village for declearation of SWAJALGRAM under NATUNGRAM Piped Water Supply Scheme , Block- Burdwan-I within Burdwan Sub Division under Burdwan Division PHE Dte JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000298/2024-2025 1280/BSD 12/07/2024 45 SHANKHA GHOSH 1.76 0.00 0 0
8 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Natungram Piped Water Supply Scheme , SM/06970 Retrofitting Providing 50 Nos.FHTC at BIRPUR village for declearation of SWAJALGRAM under NATUNGRAM Piped Water Supply Scheme , Block- Burdwan-I within Burdwan Sub Division under Burdwan Division PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE,Junior Engineer, R.W.S. Burdwan Sub Division, P.H.E. Dt ORD/000299/2024-2025 1281/BSD 12/07/2024 45 I.S. ENTERPRISE 2.28 2.28 100 100
9 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting at Deriapur PWSS , SM/06749 Retrofitting Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Deriapur village of Deriapur piped water supply scheme within Headquarters under Burdwan Division, PHE Dte. [Phase-I](Tr No.-158/BWD/2020-21) Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000086/2020-2021 2691/BWD 07/08/2020 30 ASHOK KUMAR GHOSH 4.92 9.84 200 1
10 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting at Deriapur PWSS , SM/06749 Retrofitting Continuation work order for Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Deriapur village of Deriapur piped water supply scheme within Headquarters under Burdwan Division, PHE Dte. [Phase-I](Tr No.-351/BWD/2020-21) Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000108/2020-2021 3898/BWD 12/10/2020 30 ASHOK KUMAR GHOSH 3.59 7.18 200 1
11 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting at Deriapur PWSS , SM/06749 Retrofitting Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of DERIAPUR Piped Water Supply Scheme at Astikur, Balagar & Bora Village (Mouza), Raina-I Block under Burdwan Division, PHE Dte.(Agreement No. 474/BWD OF 2020-2021) Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000129/2020-2021 4916/BWD 08/12/2020 90 ASHOK KUMAR GHOSH 39.84 61.89 155.35 1
12 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting at Deriapur PWSS , SM/06749 Retrofitting Providing leftout water tap connection in different villages for 100% coverage to make it Sajal Gram from existing distribution system within scheme jurisdiction of different Piped Water Supply Schemes within Raina ¿ I Block under Burdwan Division, PHE. Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000344/2021-2022 39/BWD 05/01/2022 30 HAFIJUR RAHAMAN MIDYA 15.62 9.10 58.26 1
13 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting at Deriapur PWSS , SM/06749 Retrofitting Conducting physical Household Survey at the IMIS reported village for HGJ certification and providing balance FHTC for Har Ghar Jal certification including conducting Gram Sabhas for different IMIS reported villages across the district under Burdwan Division, PHE Dte. AE(HQs),Assistant Engineer ,Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE.,Assistant Engineer, Durgapur Sub Division, P.H.E. Dte JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000428/2024-2025 3107/BWD 12/08/2024 323 TUBGRAM GRAMMYAK UNNAYAN SAMITY 309.60 0.00 0 85
14 PURBA BARDHAMAN Burdwan Division Providing Functional House Hold Tap Connection (FHTC) by retrofitting within the command area of Nandra Piped Water Supply Scheme , SM/07205 Retrofitting Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Nandra village of Nandra piped water supply scheme within Burdwan Sub-Division under Burdwan Division, PHE Dte. [Phase-I](Tr No.-176/BWD/2020-21) Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000102/2020-2021 2735/BWD 10/08/2020 30 BHARAT CONSTRUCTION 4.92 9.84 200 1
15 PURBA BARDHAMAN Burdwan Division Providing Functional House Hold Tap Connection (FHTC) by retrofitting within the command area of Nandra Piped Water Supply Scheme , SM/07205 Retrofitting Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Kalyanpur & Dangachha village of Nandra piped water supply scheme within Burdwan Sub-Division under Burdwan Division, PHE Dte. [Phase-I](Tr No.-177/BWD/2020-21) Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000103/2020-2021 2736/BWD 10/08/2020 30 BHARAT CONSTRUCTION 4.92 9.84 200 1
16 PURBA BARDHAMAN Burdwan Division Providing Functional House Hold Tap Connection (FHTC) by retrofitting within the command area of Nandra Piped Water Supply Scheme , SM/07205 Retrofitting Additional Extension of UPVC distribution pipeline in connection with FHTC for NANDRA & adjoining mouzas water supply scheme at Bardhaman-I Block under Burdwan division, PHE Dte.[Gr.-C] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000743/2020-2021 73/BSD 19/01/2021 30 BHARAT CONSTRUCTION 4.22 8.37 198.34 1
17 PURBA BARDHAMAN Burdwan Division Providing Functional House Hold Tap Connection (FHTC) by retrofitting within the command area of Nandra Piped Water Supply Scheme , SM/07205 Retrofitting Continuation work order for Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Nandra village of Nandra piped water supply scheme within Burdwan Sub-Division under Burdwan Division, PHE Dte. [Phase-I] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000714/2020-2021 4087/BWD 16/10/2020 30 BHARAT CONSTRUCTION 2.00 4.00 200 1
18 PURBA BARDHAMAN Burdwan Division Providing Functional House Hold Tap Connection (FHTC) by retrofitting within the command area of Nandra Piped Water Supply Scheme , SM/07205 Retrofitting Providing FHTC (130 nos.) and Extension of UPVC dist. Pipeline at Noapara, Pirtala ,Nandra village of NANDRA water supply scheme at Burdwan-II Block under Burdwan Division PHE Dte..Gr. I Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000213/2021-2022 1479/BSD 09/11/2021 30 BHARAT CONSTRUCTION 4.81 4.81 100 1
19 PURBA BARDHAMAN Burdwan Division Providing Functional House Hold Tap Connection (FHTC) by retrofitting within the command area of Nandra Piped Water Supply Scheme , SM/07205 Retrofitting Providing FHTC in Nandra & Naopara village for 100% coverage in Sajal Gram from existing distribution system within NANDRA PWSS, Bardhhaman-II Development Block under Burdwan Division, PHE Dte. Gr.F. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000339/2022-2023 1360/BSD 03/08/2022 5 BHARAT CONSTRUCTION 0.97 0.00 0 1
20 PURBA BARDHAMAN Burdwan Division Providing Functional House Hold Tap Connection (FHTC) by retrofitting within the command area of Nandra Piped Water Supply Scheme , SM/07205 Retrofitting Providing leftout water tap connection in different villages for 100% coverage in Sajal Gram from existing distribution system within scheme jurisdiction of different Piped Water Supply Schemes within Burdwan ¿ II Block under Burdwan Division, PHE. Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000416/2021-2022 385/BWD 20/01/2022 30 BISWAS ENTERPRISE 11.97 0.00 0 100
21 PURBA BARDHAMAN Burdwan Division Providing Functional House Hold Tap Connection (FHTC) by retrofitting within the command area of Nandra Piped Water Supply Scheme , SM/07205 Retrofitting Providing FHTC in Nandra & Naopara village for 100% coverage in Sajal Gram from existing distribution system within Nandra PWSS, Bardhhaman-II Development Block under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000654/2022-2023 1360-A/BSD 03/08/2022 5 BHARAT CONSTRUCTION 0.97 0.96 98.97 1
22 PURBA BARDHAMAN Burdwan Division Providing Functional House Hold Tap Connection (FHTC) by retrofitting within the command area of Nandra Piped Water Supply Scheme , SM/07205 Retrofitting Continuation work order for Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Kalyanpur & Dangachha village of Nandra Piped Water Supply Scheme within Burdwan Sub-Divn. under Burdwan Division, PHE. Dte. [Phase - I] [GROUP : ¿10B¿] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. Junior Engineer, Burdwan Sadar Sub-Division ORD/000463/2020-2021 4085/BWD 16/10/2020 30 BHARAT CONSTRUCTION 1.65 3.30 200 0
23 PURBA BARDHAMAN Burdwan Division Providing Functional House Hold Tap Connection (FHTC) by retrofitting within the command area of Nandra Piped Water Supply Scheme , SM/07205 Retrofitting Conducting physical Household Survey at the IMIS reported village for HGJ certification and providing balance FHTC for Har Ghar Jal certification including conducting Gram Sabhas for different IMIS reported villages across the district under Burdwan Division, PHE Dte. AE(HQs),Assistant Engineer ,Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE.,Assistant Engineer, Durgapur Sub Division, P.H.E. Dte JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000428/2024-2025 3107/BWD 12/08/2024 323 TUBGRAM GRAMMYAK UNNAYAN SAMITY 309.60 0.00 0 85
24 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) under the command area of Taraposh Piped Water Supply Scheme , SM/07553 Retrofitting Hire & fuel charges of vehicle (Car No.-WB-41H-9788) for the office of the Assistant Engineer, Headquarters, Burdwan Division, PHE Dte. for the month of September & October'2022. VCH/000839/2022-2023 766/VEH/22-23 22/11/2022 0 SK. ASRAFUDDIN 0.70 0.00 0 0
25 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) under the command area of Taraposh Piped Water Supply Scheme , SM/07553 Retrofitting Hire & fuel charges of vehicle (Car No.-WB-41H-9788) for the office of the Assistant Head Quarters, Burdwan Division, PHE Dte. for the month of June & July'22. VCH/000493/2022-2023 460/VEH/22-23 29/08/2022 0 SK. ASRAFUDDIN 0.76 0.00 0 0
26 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) under the command area of Taraposh Piped Water Supply Scheme , SM/07553 Retrofitting Providing functional household tap connection (FHTC) from existing distribution system within the command area of Taraposh piped water supply scheme at Alladipur, Chintamonipur, Jarul, Kamdebpur, Punia, Sunia & Taraposh, Khandaghosh Block under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000584/2020-2021 4766/BWD 01/12/2020 90 SINGHA ROY AND CO. 70.55 27.59 39.11 1
27 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) under the command area of Taraposh Piped Water Supply Scheme , SM/07553 Retrofitting Providing leftout water tap connection in different villages for 100% coverage to make it Sajal Gram from existing distribution system within scheme jurisdiction of different Piped Water Supply Schemes within Khandaghosh Block under Burdwan Division, PHE. Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000405/2021-2022 283/BWD 17/01/2022 30 J. K. CORPORATION 11.88 11.87 99.92 1
28 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) under the command area of Taraposh Piped Water Supply Scheme , SM/07553 Retrofitting Repairing of Pipeline of DVC 11 No. Canal towards Amila Bazar and DVC 11B No. Conal Towards Sehara Bazar at TARAPOSH Pipes Water Supply Scheme at Khandaghosh Block under Burdwan Division,PHE Dte. Group : F Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000093/2022-2023 833/BSD 23/05/2022 30 HAFIJUR RAHAMAN MIDYA 1.56 1.57 100.64 1
29 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) under the command area of Taraposh Piped Water Supply Scheme , SM/07553 Retrofitting Construction of 250 cum capacity 20 Mtr staging height RCC Over Head Reservoir including pipe connection and cost of pipes specials including soil investigation for TARAPOSH & its adjoining mouzas water supply scheme under Burdwan Sub-Division, under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000973/2020-2021 4594/BWD 24/11/2020 180 MITRA CONSTRUCTION 57.00 56.00 98.25 100
30 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) under the command area of Taraposh Piped Water Supply Scheme , SM/07553 Retrofitting Extension Pipeline with Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of TARAPOSE Piped Water Supply Scheme within KHANDAGHOSH Block of Burdwan Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000759/2022-2023 1289/BWD 20/03/2023 30 GENUINE ENGINEERING CO-OP. SOCIETY LTD. 21.86 0.00 0 100
31 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) under the command area of Chandutia Piped Water Supply Scheme , SM/07554 Retrofitting Providing leftout water tap connection in different villages for 100% coverage to make it Sajal Gram from existing distribution system within scheme jurisdiction of different Piped Water Supply Schemes within Burdwan ¿ I Block under Burdwan Division, PHE. Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000342/2021-2022 32/BWD 04/01/2022 30 ROY BISWAS CONSTRUCTION 9.89 5.00 50.56 1
32 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Fakirpur Piped Water Supply Scheme at Burdwan-I Block , SM/07797 Retrofitting Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of FAKIRPUR Piped Water Supply Scheme at Fakirpur & Bongpur village (Mouza), Burdwan - I Block under Burdwan Division, PHE Dte._2ND CALL. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000641/2020-2021 355/BWD 15/01/2021 45 AYSAN KHAN 36.69 18.91 51.54 1
33 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Fakirpur Piped Water Supply Scheme at Burdwan-I Block , SM/07797 Retrofitting Providing Balance Functional Household Tap Connection (FHTC)for Swajal Gram from existing distribution system within the command area of Idilpur & Fakirpur village under Fakirpur Piped W/S.Scheme under Burdwan-I Block of Burdwan Sub-Division under Burdwan Division, PHE Dte. Gr. I Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000346/2022-2023 1380/BSD 05/08/2022 5 BAMDEB CONSTRUCTION & CO 0.96 0.96 100 100
34 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Fakirpur Piped Water Supply Scheme at Burdwan-I Block , SM/07797 Retrofitting Providing Balance Functional Household Tap Connection(FHTC)for Swajal Gram from existing distribution system within the command area of Idilpur & Fakirpur Village under of FAKIRPUR W.S.Scheme of Burdwan-I Block of Burdwan Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000847/2022-2023 1380-A/BSD 05/08/2022 5 BAMDEB CONSTRUCTION & CO 0.96 0.00 0 0
35 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Fakirpur Piped Water Supply Scheme at Burdwan-I Block , SM/07797 Retrofitting Construction of boundary wall at Head works site of Fakirpur water supply scheme under Bardhaman-I Block under Burdwan Division, PHE Dte.[Length-50.20 Mtr][Part-B][South & West Side][Gr.-C] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000558/2021-2022 1026/BSD 05/08/2021 45 AYSAN KHAN 3.77 0.00 0 1
36 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Fakirpur Piped Water Supply Scheme at Burdwan-I Block , SM/07797 Retrofitting Providing 22 Nos.FHTC at IDILPUR & FAKIRPUR village for declearation of SWAJALGRAM under FAKIRPUR Piped Water Supply Scheme, Block- Burdwan-I within Burdwan Sub Division under Burdwan Division PHE Dte. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000166/2024-2025 1035/BSD 10/06/2024 30 IMPULSE INTERNATIONAL 0.75 0.00 0 0
37 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Balarampur Piped Water Supply Scheme at Jamalpur Block , SM/07776 Retrofitting Providing leftout water tap connection in different villages for 100% coverage to make it Sajal Gram from existing distribution system within scheme jurisdiction of different Piped Water Supply Schemes within Jamalpur Block (Paratal-II, Berugram, Abujhati & Chakdighi G.P.) under Burdwan Division, PHE. Dte. (Part-B). AE(HQs),Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JE/RWS/JAMALPUR ORD/000345/2021-2022 40/BWD 05/01/2022 30 PREMANANDA ROY BISWAS 22.68 5.00 22.05 1
38 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Balarampur Piped Water Supply Scheme at Jamalpur Block , SM/07776 Retrofitting Providing leftout water tap connection in different villages for 100% coverage to make it Sajal Gram from existing distribution system within scheme jurisdiction of different Piped Water Supply Schemes within Jamalpur Block (Jarogram, Ajhapur, Panchra & Jougram G.P.) under Burdwan Division, PHE. Dte. (Part-A)_2ND CALL. AE(HQs),Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JE/RWS/JAMALPUR ORD/000592/2021-2022 1454/BWD 11/03/2022 30 PREMANANDA ROY BISWAS 18.83 6.19 32.87 1
39 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Balarampur Piped Water Supply Scheme at Jamalpur Block , SM/07776 Retrofitting Sinking of 300 X 200mm dia Tube Well 150 mtr. Depth by D.R. Rig method using UPVC pipe (CM) and UPVC Deep Well Screen (RMS) for Augmentation of BALARAMPUR & its adjoining mouzas Piped Water Supply Scheme, Block - Jamalpur, Dist - Purba Bardhaman under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000524/2022-2023 4887/BWD 02/11/2022 30 BIBHUTI SHAW 10.07 9.83 97.62 100
40 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Balarampur Piped Water Supply Scheme at Jamalpur Block , SM/07776 Retrofitting Material Requisition To Resource Division RTOR000023/2021-2022 423/BWD 20/01/2022 0 Resource Division 5.50 0.00 0 0
41 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Balarampur Piped Water Supply Scheme at Jamalpur Block , SM/07776 Retrofitting Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of Balarampur Piped Water Supply Scheme at Balarampur (3 Nos Habitation), Berugram (3 Nos Habitation), Krishnapur (2 Nos Habitation) & Sadipur (3 Nos Habitation Part) Village (Mouza), Jamalpur Block under Burdwan Division, PHE Dte. [Agreement No. 66/2020-2021 OF SE/CC/PHE. DTE.] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. Junior Engineer, R.W.S. Burdwan Sub Division, P.H.E. Dt ORD/000431/2020-2021 5009/BWD 10/12/2020 90 M/S ASHA CONSTRUCTION 100.79 51.35 50.95 0
42 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Balarampur Piped Water Supply Scheme at Jamalpur Block , SM/07776 Retrofitting Construction of temporary approach road for Boring machine and its accessories at 4th Tube Well site (due to low land) of Balarampur PWSS, Jamalpur Dev. Block Burdwan Sub-Division under Burdwan Division,PHE Dte Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. RWS_JAMALPUR ORD/001089/2023-2024 519/BSD 13/03/2024 15 BIBHUTI SHAW 0.92 0.90 97.83 100
43 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Balarampur Piped Water Supply Scheme at Jamalpur Block , SM/07776 Retrofitting Laying pipeline with FHTC for BALARAMPUR Water Supply Scheme at Matnasipur village (600 Nos) (from near rail gate to matnasipur) and rest portion FHTC work of Berugram village (46 Nos), Balarampur village (40 Nos), Nasipur village (45 Nos), Salimdanga village (15 Nos) within Jamalpur Block, under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. RWS_JAMALPUR ORD/000639/2021-2022 1620/BWD 21/03/2022 1217 M/S ASHA CONSTRUCTION 47.32 0.00 0 100
44 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Agradwip Piped Water Supply Scheme at Katwa-II Block , SM/07782 Retrofitting Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of AGRADWIP Piped Water Supply Scheme at Agradwip, Babla danga, Gonsaidhowra, Saheb Nagar & Sarawaridhowra (Mouza), Katwa - II Block under Burdwan Division, PHE Dte. Assistant Engineer ORD/000445/2021-2022 6253/BWD 01/11/2021 60 SHUBHRA KANTI GHOSH 53.67 19.01 35.42 1
45 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Agradwip Piped Water Supply Scheme at Katwa-II Block , SM/07782 Retrofitting Replacement and extension of pipe line from the existing Distribution System within scheme jurisdiction at Agradwip Ghosh para village under AGRADWIP PWSS under Katwa Sub-Division under Burdwan Division PHE Dte.(Sl No-6) Assistant Engineer JUNIOR ENGINEER KATWA SUB-DIVISION PHE DTE ORD/000145/2021-2022 594/KTS 06/09/2021 30 SHUBHRA KANTI GHOSH 3.56 3.56 100 1
46 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Agradwip Piped Water Supply Scheme at Katwa-II Block , SM/07782 Retrofitting Replacement and extension of pipe line from the existing Distribution System within scheme jurisdiction at Agradwip Gopinath para and Majherpara village under AGRADWIP PWSS under Katwa Sub-Division under Burdwan Division PHE Dte.(Sl No-5) Assistant Engineer JUNIOR ENGINEER KATWA SUB-DIVISION PHE DTE ORD/000144/2021-2022 593/KTS 06/09/2021 30 CHANCHAL PAL 3.47 3.47 100 1
47 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Agradwip Piped Water Supply Scheme at Katwa-II Block , SM/07782 Retrofitting Replacement and extension of pipe line from the existing Distribution System within scheme jurisdiction at Sahebnagar village under AGRADWIP PWSS under Katwa Sub-Division under Burdwan Division PHE Dte.(Sl No-4) Assistant Engineer JUNIOR ENGINEER KATWA SUB-DIVISION PHE DTE ORD/000143/2021-2022 592/KTS 06/09/2021 30 TAPAS KUMAR ROY 4.84 4.82 99.59 1
48 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Agradwip Piped Water Supply Scheme at Katwa-II Block , SM/07782 Retrofitting Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of Agradwip Piped Water Supply Scheme at Agradwip (P) village & Kharpur (P) village, Katwa - II Block under Burdwan Division, PHE Dte._Part-B.[Agreement No. 685/BWD OF 2020-2021.] Assistant Engineer JUNIOR ENGINEER KATWA SUB-DIVISION PHE DTE ORD/000305/2020-2021 1511/BWD 19/02/2021 45 SHUBHRA KANTI GHOSH 44.47 87.03 195.7 0
49 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Agradwip Piped Water Supply Scheme at Katwa-II Block , SM/07782 Retrofitting Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of Agradwip Piped Water Supply Scheme at Agradwip (P) village & Kharpur (P) village, Katwa - II Block under Burdwan Division, PHE Dte._Part-A. [Agreement No. 704/BWD OF 2020-2021] Assistant Engineer JUNIOR ENGINEER KATWA SUB-DIVISION PHE DTE ORD/000323/2020-2021 1567/BWD 22/02/2021 45 KHEPIMA ENGINEERS CO. OPERATIVE SOCIETY LTD. 44.39 86.97 195.92 0
50 PURBA BARDHAMAN Burdwan Division Augmentation of ground water based BAHARAN-BIRHIMPUR PWSS to accommodate FHTC in Ketugram-II block under Katwa Sub Division of Burdwan Division in Purba Bardhaman District , SM/09406 Augmentation Route Survey and preparation of DPR for BAHARAN BIRHIMPUR PWSS under Ketugram-II Block under Katwa Sub-Division under Burdwan Division PHE Dte. [Sl No-01] Assistant Engineer ORD/000537/2021-2022 43/KTS 24/01/2022 21 RADIANT 2.60 2.60 100 1
51 PURBA BARDHAMAN Burdwan Division Augmentation of ground water based BAHARAN-BIRHIMPUR PWSS to accommodate FHTC in Ketugram-II block under Katwa Sub Division of Burdwan Division in Purba Bardhaman District , SM/09406 Augmentation Supply of materials for different water supply scheme under Burdwan Division, PHE Dte. VCH/001578/2021-2022 1207/DW 10/03/2022 0 EXECUTIVE ENGINEER, RESOURCES DIVISION, P.H.E. DTE. 3,005.00 0.00 0 0
52 PURBA BARDHAMAN Burdwan Division Augmentation of ground water based BAHARAN-BIRHIMPUR PWSS to accommodate FHTC in Ketugram-II block under Katwa Sub Division of Burdwan Division in Purba Bardhaman District , SM/09406 Augmentation Material Requisition To Resource Division RTOR000085/2021-2022 882/BWD 11/02/2022 0 Resource Division 7.08 0.00 0 0
53 PURBA BARDHAMAN Burdwan Division Augmentation of ground water based BAHARAN-BIRHIMPUR PWSS to accommodate FHTC in Ketugram-II block under Katwa Sub Division of Burdwan Division in Purba Bardhaman District , SM/09406 Augmentation Material Requisition To Resource Division RTOR000051/2021-2022 534/BWD 27/01/2022 0 Resource Division 11.25 0.00 0 0
54 PURBA BARDHAMAN Burdwan Division Augmentation of ground water based BAHARAN-BIRHIMPUR PWSS to accommodate FHTC in Ketugram-II block under Katwa Sub Division of Burdwan Division in Purba Bardhaman District , SM/09406 Augmentation Material Requisition To Resource Division RTOR000202/2021-2022 1525/BWD 15/03/2022 0 Resource Division 0.37 0.00 0 0
55 PURBA BARDHAMAN Burdwan Division Augmentation of ground water based BAHARAN-BIRHIMPUR PWSS to accommodate FHTC in Ketugram-II block under Katwa Sub Division of Burdwan Division in Purba Bardhaman District , SM/09406 Augmentation Augmentation of BAHRAN BIRAHIMPUR Piped Water Supply Scheme with LDS, FHTC, Rising main, Construction of 250 cum capacity OHR with 20.0 mtr. Staging height inclusive of soil investigation with repairing of Pump house -I & II under Ketugram-II Block, District:- Purba-Burdwan. Assistant Engineer JUNIOR ENGINEER R.W.S. BURDWAN SUB-DIVISION PHE DTE ORD/000060/2022-2023 2252/BWD 02/05/2022 365 ASHOK MITRA 290.62 223.89 77.04 100
56 PURBA BARDHAMAN Burdwan Division Augmentation of MANTESWAR PWSS for providing functional household tap connection FHTC in Manteswar block under Burdwan Division in Purba Bardhaman District , SM/09414 Augmentation Preparation of DPR for augmentation of Monteswar W/S Scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. (Sl No-F) Assistant Engineer ORD/000572/2021-2022 208/KSD 23/02/2022 21 INDRANIL DUTTA & ASSOCIATES 2.75 2.73 99.27 1
57 PURBA BARDHAMAN Burdwan Division Augmentation of MANTESWAR PWSS for providing functional household tap connection FHTC in Manteswar block under Burdwan Division in Purba Bardhaman District , SM/09414 Augmentation Supply and delivery of different dia. CIDF sluice valve for Augmentation of Jahannagar, Ganganandapur, Nowapara & Monteswar Piped Water Supply Scheme within Kalna Sub-Division under Burdwan Division, P.H.E. Dte.[Part B] Assistant Engineer ORD/000357/2022-2023 3728/BWD 30/08/2022 20 NANDY UDYOG 2.88 2.88 100 1
58 PURBA BARDHAMAN Burdwan Division Augmentation of MANTESWAR PWSS for providing functional household tap connection FHTC in Manteswar block under Burdwan Division in Purba Bardhaman District , SM/09414 Augmentation Supply of materials for different water supply scheme under Burdwan Division, PHE Dte. VCH/001578/2021-2022 1207/DW 10/03/2022 0 EXECUTIVE ENGINEER, RESOURCES DIVISION, P.H.E. DTE. 3,005.00 0.00 0 0
59 PURBA BARDHAMAN Burdwan Division Augmentation of MANTESWAR PWSS for providing functional household tap connection FHTC in Manteswar block under Burdwan Division in Purba Bardhaman District , SM/09414 Augmentation Augmentation of MANTESHWAR Piped Water Supply Scheme with LDS, FHTC, Rising Main, Construction of 300 Cum capacity OHR with 20.0 Mtr. Staging height inclusive of soil investigation & boundary wall construction at 2nd TW site under Monteswar Block, District - Purba Bardhaman. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000008/2022-2023 1938/BWD 11/04/2022 365 CHIRANJIB DAS 341.15 263.48 77.23 50
60 PURBA BARDHAMAN Burdwan Division Augmentation of MANTESWAR PWSS for providing functional household tap connection FHTC in Manteswar block under Burdwan Division in Purba Bardhaman District , SM/09414 Augmentation Supply and delivery of different dia. CIDF sluice valve for Augmentation of Jahannagar, Ganganandapur, Nowapara & Monteswar Piped Water Supply Scheme within Kalna Sub-Division under Burdwan Division, P.H.E. Dte.[Part ¿ A] Assistant Engineer ORD/000323/2022-2023 3632/BWD 22/08/2022 20 RAMASISH ENTERPRISE 12.80 3.20 25 1
61 PURBA BARDHAMAN Burdwan Division Augmentation of MANTESWAR PWSS for providing functional household tap connection FHTC in Manteswar block under Burdwan Division in Purba Bardhaman District , SM/09414 Augmentation Sinking of 250 X 150mm dia Tube Well 150 mtr. Depth by D.R. Rig method using UPVC pipe (CM) and UPVC Deep Well Screen (RMS) for 1ST TW Site of Aug. of MONTESWAR & its adjoining mouzas Piped Water Supply Scheme, Block ? Monteswar, Dist - Purba Bardhaman under Burdwan Division, PHE Dte. Assistant Engineer ORD/000550/2022-2023 5178/BWD 23/11/2022 30 ANIRUDDHA FARUQUE 8.73 7.90 90.49 100
62 PURBA BARDHAMAN Burdwan Division Augmentation of MANTESWAR PWSS for providing functional household tap connection FHTC in Manteswar block under Burdwan Division in Purba Bardhaman District , SM/09414 Augmentation Work Order for "Surging of existing 300 x 200 mm dia Tube Well depth 123 mtr & lowering of part tube well 200 x 150 mm dia depth , existing 300 x 200 mm dia tube well at Manteswar zone-I under Kalna Sub-Division , PHE Dte." JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000551/2023-2024 1306/KSD 23/08/2023 30 SUSUNIA GP CO. OPERATIVE LABOUR CONTRACT AND CONSTRUCTION SOCIETY LTD. 4.20 4.16 99.05 100
63 PURBA BARDHAMAN Burdwan Division Augmentation of MANTESWAR PWSS for providing functional household tap connection FHTC in Manteswar block under Burdwan Division in Purba Bardhaman District , SM/09414 Augmentation Material Requisition To Resource Division RTOR000049/2021-2022 563/BWD 27/01/2022 0 Resource Division 14.37 0.00 0 0
64 PURBA BARDHAMAN Burdwan Division Augmentation of MANTESWAR PWSS for providing functional household tap connection FHTC in Manteswar block under Burdwan Division in Purba Bardhaman District , SM/09414 Augmentation Quotation for new service connection charges of Monteswar PWSS.[PH No.-3] BILL/01126/2023-2024 1085/JJM 20/12/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LTD. 4.99 0.00 0 0
65 PURBA BARDHAMAN Burdwan Division Providing Functional House hold Tap Connection (FHTC) by retrofitting at Kasa, Denur, Patun and Bigha mouzas within the command area of Putsuri piped Water Supply Scheme at Manteswar Block under Burdwan Division, P.H.E. DTE. (Pt.-B) , SM/08715 Retrofitting Construction of concrete path way at Head Work Site & 2nd & 3rd Tube Well site along with plinth protection of Pump House No-I & laying of 200 mm dia DI Pipe for wash out and over flow drain of existing OHR of Putsuri W/S Scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer ORD/000038/2022-2023 2218/BWD 28/04/2022 30 BISHWAJIT DAS 4.07 0.00 0 0
66 PURBA BARDHAMAN Burdwan Division Providing Functional House hold Tap Connection (FHTC) by retrofitting at Kasa, Denur, Patun and Bigha mouzas within the command area of Putsuri piped Water Supply Scheme at Manteswar Block under Burdwan Division, P.H.E. DTE. (Pt.-B) , SM/08715 Retrofitting Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of PUTSURI Piped Water Supply Scheme at Kasa (6 Nos. Habs.), Purba Balarampur, Bhurkunda (7 Nos. Habs.), Patun (5 Nos. Habs.) & Bigha (3 Nos. Habs.) Village (Mouza), Monteswar Block under Burdwan Division, PHE Dte. Assistant Engineer ORD/000302/2021-2022 7020/BWD 17/12/2021 60 INVENT ENGINEERS CO. OPERATIVE SOCIETY LTD. 53.94 45.21 83.82 1
67 PURBA BARDHAMAN Burdwan Division Providing Functional House hold Tap Connection (FHTC) by retrofitting at Kasa, Denur, Patun and Bigha mouzas within the command area of Putsuri piped Water Supply Scheme at Manteswar Block under Burdwan Division, P.H.E. DTE. (Pt.-B) , SM/08715 Retrofitting Laying of different dia.UPVC pipeline at the damaged portion from Denur to Mousa Daukadanga under Putsuri & its adjoining mouzas water supply scheme within Kalna Sub-Division, under Burdwan Division, PHE Dte. Assistant Engineer ORD/000778/2021-2022 6013/BWD 05/10/2021 30 D.M. ENTERPRISE 23.17 0.00 0 1
68 PURBA BARDHAMAN Burdwan Division Providing Functional House hold Tap Connection (FHTC) by retrofitting at Kasa, Denur, Patun and Bigha mouzas within the command area of Putsuri piped Water Supply Scheme at Manteswar Block under Burdwan Division, P.H.E. DTE. (Pt.-B) , SM/08715 Retrofitting Sinking of Tube Well, Construction of Pump House, Boundary wall & interconnection work of Kasa village of PUTSURI Water Supply Scheme within Kalna Sub-Division under Burdwan division, PHE Dte. Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer ,Junior Engineer1, Durgapur Sub-Division, PHE Dte. ORD/000721/2023-2024 4532/BWD 13/10/2023 60 B.S. ENTERPRISE 27.32 14.54 53.22 40
69 PURBA BARDHAMAN Burdwan Division Providing Functional House hold Tap Connection (FHTC) by retrofitting at Kasa, Denur, Patun and Bigha mouzas within the command area of Putsuri piped Water Supply Scheme at Manteswar Block under Burdwan Division, P.H.E. DTE. (Pt.-B) , SM/08715 Retrofitting Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of Putsuri Piped Water Supply Scheme at Denur (6 Nos Habitation Part) & Putsuri (11 Nos Habitation Part) Village (Mouza), Monteswar Block under Burdwan Division, PHE Dte.(Agreement No. 55/2020-2021 OF SE/CC/PHE. DTE.) AE(HQs) J.E. 2 BURDWAN ORD/000125/2020-2021 4887/BWD 07/12/2020 90 M/S S. CHOUDHURY 77.12 16.00 20.75 1
70 PURBA BARDHAMAN Burdwan Division Providing Functional House hold Tap Connection (FHTC) by retrofitting at Kasa, Denur, Patun and Bigha mouzas within the command area of Putsuri piped Water Supply Scheme at Manteswar Block under Burdwan Division, P.H.E. DTE. (Pt.-B) , SM/08715 Retrofitting Construction of Pump House cum switch room (5.40m x 3.60m) with sanitary arrangement (As per drawing no-PHE/SE/CC/PH/ DWG-01/2022-2023) at Aug. of MANTESWAR Water Supply Scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. 1 No Pump House. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/001013/2023-2024 467/BWD 05/02/2024 60 BISHWAJIT DAS 5.86 0.00 0 100
71 PURBA BARDHAMAN Burdwan Division Augmentation of ground water based RAINA PWSS to accommodate FHTC in Raina-I block under Burdwan Sub Division of Burdwan Division in Purba Bardhaman District , SM/09493 Augmentation Route Survey & Preparation of DPR for Raina W/S Scheme under Raina-I Block under Burdwan Sub-Division under Burdwan Division PHE Dte. Sl No.12. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000501/2021-2022 187/BSD 31/01/2022 30 RADIANT 2.72 2.71 99.63 1
72 PURBA BARDHAMAN Burdwan Division Augmentation of ground water based RAINA PWSS to accommodate FHTC in Raina-I block under Burdwan Sub Division of Burdwan Division in Purba Bardhaman District , SM/09493 Augmentation Quotation for shifting of 11 KV Raina Local Feeder at Raina PHE under Burdwan South Division, WBSEDCL.[Ref ID-860249099, App ID-100000061079, dt.-22/09/2022] VCH/000558/2022-2023 675/DW/22-23 29/09/2022 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LTD. 4.94 0.00 0 0
73 PURBA BARDHAMAN Burdwan Division Augmentation of ground water based RAINA PWSS to accommodate FHTC in Raina-I block under Burdwan Sub Division of Burdwan Division in Purba Bardhaman District , SM/09493 Augmentation Supply of materials for different water supply scheme under Burdwan Division, PHE Dte. VCH/001578/2021-2022 1207/DW 10/03/2022 0 EXECUTIVE ENGINEER, RESOURCES DIVISION, P.H.E. DTE. 3,005.00 0.00 0 0
74 PURBA BARDHAMAN Burdwan Division Augmentation of ground water based RAINA PWSS to accommodate FHTC in Raina-I block under Burdwan Sub Division of Burdwan Division in Purba Bardhaman District , SM/09493 Augmentation Laying Distribution of 160 mm dia HDPE pipeline for Augmentation of RAINA Piped Water Supply Scheme AT NODE 138 to 135, 135 to 119, 119 to 114, 114 to 110 to 105, 105 to 93 within Burdwan Sub-Division under Burdwan Division, PHE Dte. Gr.B. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000365/2022-2023 1404/BSD 10/08/2022 45 RANADHIR SINHA 4.77 3.53 74 0
75 PURBA BARDHAMAN Burdwan Division Augmentation of ground water based RAINA PWSS to accommodate FHTC in Raina-I block under Burdwan Sub Division of Burdwan Division in Purba Bardhaman District , SM/09493 Augmentation Supply of 100 mm dia C.I. Sluice valve (P.N.-I) of Augmentation of Raina water supply scheme of Raina-I under Burdwan sub division, PHE Dte. Gr.C. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000572/2022-2023 1851/BSD 21/10/2022 15 SINHA BROTHERS 0.47 0.47 100 1
76 PURBA BARDHAMAN Burdwan Division Augmentation of ground water based RAINA PWSS to accommodate FHTC in Raina-I block under Burdwan Sub Division of Burdwan Division in Purba Bardhaman District , SM/09493 Augmentation Sinking of 300 X 200mm dia Tube Well 150 mtr. Depth by D.R. Rig method using UPVC pipe (CD) and UPVC Deep Well Screen (RDS) for Aug. of RAINA W/S Scheme (H.W SITE) under Raina-I Block within Burdwan Sub-Division, PHE Dte. [For 01 No. Tube well]. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000190/2023-2024 2697/BWD 08/06/2023 30 RANADHIR SINHA 13.20 11.37 86.14 100
77 PURBA BARDHAMAN Burdwan Division Augmentation of ground water based RAINA PWSS to accommodate FHTC in Raina-I block under Burdwan Sub Division of Burdwan Division in Purba Bardhaman District , SM/09493 Augmentation Restoration work at various location at Thanar Danga to Nandipara Kalitala via.Ranapara and Raina Co-Operative Society of Augmentation of Raina Water Supply Scheme at Raina-I Block within under Burdwan Division,PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000180/2023-2024 1004/BSD 06/06/2023 15 SOUMYAVASH DAS 0.95 0.94 98.95 100
78 PURBA BARDHAMAN Burdwan Division Augmentation of ground water based RAINA PWSS to accommodate FHTC in Raina-I block under Burdwan Sub Division of Burdwan Division in Purba Bardhaman District , SM/09493 Augmentation Material Requisition To Resource Division RTOR000060/2021-2022 559/BWD 27/01/2022 0 Resource Division 12.84 0.00 0 0
79 PURBA BARDHAMAN Burdwan Division Augmentation of ground water based RAINA PWSS to accommodate FHTC in Raina-I block under Burdwan Sub Division of Burdwan Division in Purba Bardhaman District , SM/09493 Augmentation Material Requisition To Resource Division RTOR000095/2021-2022 932/BWD 16/02/2022 0 Resource Division 23.01 0.00 0 0
80 PURBA BARDHAMAN Burdwan Division Augmentation of ground water based RAINA PWSS to accommodate FHTC in Raina-I block under Burdwan Sub Division of Burdwan Division in Purba Bardhaman District , SM/09493 Augmentation Material Requisition To Resource Division RTOR000217/2021-2022 1540/BWD 15/03/2022 0 Resource Division 0.37 0.00 0 0
81 PURBA BARDHAMAN Burdwan Division Augmentation of ground water based RAINA PWSS to accommodate FHTC in Raina-I block under Burdwan Sub Division of Burdwan Division in Purba Bardhaman District , SM/09493 Augmentation Augmentation of RAINA Piped Water Supply Scheme with LDS, FHTC, Rising Main & Construction of 300 Cum capacity OHR with 20.0 Mtr. Staging height inclusive of soil test under Raina ¿ I Block, District - Purba Bardhaman. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000600/2021-2022 1475/BWD 14/03/2022 365 RANADHIR SINHA 319.21 251.96 78.93 100
82 PURBA BARDHAMAN Burdwan Division Augmentation of ground water based RAINA PWSS to accommodate FHTC in Raina-I block under Burdwan Sub Division of Burdwan Division in Purba Bardhaman District , SM/09493 Augmentation Quotation for new service connection of Augmentation of Raina water supply scheme.[REF ID-503550762][TW-3] BILL/01691/2023-2024 1367/JJM 20/02/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LTD. 3.08 0.00 0 0
83 PURBA BARDHAMAN Burdwan Division Rejuvenation of Bhalki Water Supply Scheme. , SM/09103 Augmentation Restoration of Pipeline by Re-Laying of Pipe Line for Rejuvenation of BHALKI and its adjoining mouza's Piped W/S Scheme at Ausgram-II Block under Burdwan Division, P.H.E. Dte. Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000104/2021-2022 3877/BWD 27/07/2021 60 ASHOK KUMAR GHOSH 279.81 276.39 98.78 1
84 PURBA BARDHAMAN Burdwan Division Rejuvenation of Bhalki Water Supply Scheme. , SM/09103 Augmentation Construction of Drain and restoration of connection for Augmentation of BHALKI W/S Scheme , Block- Ausgram-II, under Durgapur (Burdwan North)Sub Division Burdwan Division, P.H.E. Dte. [SL-B] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000121/2022-2023 334/DSD 27/06/2022 30 TAUSIF HOSSAIN MONDAL 1.88 1.87 99.47 1
85 PURBA BARDHAMAN Burdwan Division Rejuvenation of Bhalki Water Supply Scheme. , SM/09103 Augmentation Making structure with GI pipe for provision of joining and laying of pipeline near Abhirampur branch Canal for Bhalki and its adjoining mouza's Piped W/S Scheme at Ausgram-II Block within Durgapur Sub Division under Burdwan Division, P.H.E. Dte. [Gr.-H] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000134/2022-2023 349/DSD 30/06/2022 45 PARTHA RAY 1.90 1.82 95.79 1
86 PURBA BARDHAMAN Burdwan Division Rejuvenation of Bhalki Water Supply Scheme. , SM/09103 Augmentation Providing Functional Household Tap Connection (FHTC) from existing distribution system with within the command area of augmentation BHALKI Piped Water Supply Scheme at Bhalki (Part), Chandipur (Part), Samantapara (Part), Telota (Part) & Abhirampuri (Part) village, habitation, Ausgram-II Block within Durgapur (Burdwan North) Sub Division under Burdwan Division, P.H.E. Dte. Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000006/2022-2023 1907/BWD 07/04/2022 30 ROY CONSTRUCTION 49.52 0.00 0 1
87 PURBA BARDHAMAN Burdwan Division Augmentation of Patuli PWSS for providing FHTC under Burdwan Divison. , SM/09718 Augmentation Preparation of DPR for augmentation of Patuli W/S Scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. (Sl No-A) Assistant Engineer ORD/000513/2021-2022 181/KSD 21/02/2022 21 M/S R. DUTTA & CO. 3.75 3.81 101.6 1
88 PURBA BARDHAMAN Burdwan Division Augmentation of Patuli PWSS for providing FHTC under Burdwan Divison. , SM/09718 Augmentation Supply of materials for different water supply scheme under Burdwan Division, PHE Dte. VCH/001578/2021-2022 1207/DW 10/03/2022 0 EXECUTIVE ENGINEER, RESOURCES DIVISION, P.H.E. DTE. 3,005.00 0.00 0 0
89 PURBA BARDHAMAN Burdwan Division Augmentation of Patuli PWSS for providing FHTC under Burdwan Divison. , SM/09718 Augmentation Supply of materials for different water supply schemes under Burdwan Division, PHE Dte. VCH/001555/2021-2022 1194/DW 10/03/2022 0 EXECUTIVE ENGINEER, RESOURCES DIVISION, P.H.E. DTE. 62.76 0.00 0 0
90 PURBA BARDHAMAN Central Mechanical Augmentation of Patuli PWSS for providing FHTC under Burdwan Divison. , SM/09718 Augmentation Supply & Installation of Submersible Pumping Machinery , Voltage Stabilizer, Chlorination system and internal House wiring for Tube well no.- 1 & 2 at Augumentation of Patuli (Zone - II) Water Supply Scheme under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000065/2023-2024 2566/CMD 06/06/2023 30 M/S. S.R. ENTERPRISE 21.77 0.00 0 0
91 PURBA BARDHAMAN Burdwan Division Augmentation of Patuli PWSS for providing FHTC under Burdwan Divison. , SM/09718 Augmentation Work Order for "Replacement of Valve and Restoration of Concrete Roads at Patuli Water Supply Scheme within Kalna Sub-Division under Burdwan Division, PHE Dte." JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000549/2023-2024 1304/KSD 23/08/2023 30 IYASIN DAFADAR 4.09 4.04 98.78 100
92 PURBA BARDHAMAN Burdwan Division Augmentation of Patuli PWSS for providing FHTC under Burdwan Divison. , SM/09718 Augmentation Material Requisition To Resource Division RTOR000018/2021-2022 7348/BWD 30/12/2021 0 Resource Division 13.73 0.00 0 0
93 PURBA BARDHAMAN Burdwan Division Augmentation of Patuli PWSS for providing FHTC under Burdwan Divison. , SM/09718 Augmentation Material Requisition To Resource Division RTOR000183/2021-2022 1378/BWD 09/03/2022 0 Resource Division 4.45 0.00 0 0
94 PURBA BARDHAMAN Burdwan Division Augmentation of Patuli PWSS for providing FHTC under Burdwan Divison. , SM/09718 Augmentation Material Requisition To Resource Division RTOR000165/2021-2022 1325/BWD 08/03/2022 0 Resource Division 74.18 0.00 0 0
95 PURBA BARDHAMAN Burdwan Division Augmentation of Patuli PWSS for providing FHTC under Burdwan Divison. , SM/09718 Augmentation Material Requisition To Resource Division RTOR000033/2021-2022 557/BWD 27/01/2022 0 Resource Division 22.05 0.00 0 0
96 PURBA BARDHAMAN Burdwan Division Augmentation of Patuli PWSS for providing FHTC under Burdwan Divison. , SM/09718 Augmentation Material Requisition To Resource Division RTOR000233/2021-2022 1557/BWD 15/03/2022 0 Resource Division 0.00 0.00 NAN 0
97 PURBA BARDHAMAN Burdwan Division Augmentation of Patuli PWSS for providing FHTC under Burdwan Divison. , SM/09718 Augmentation Material Requisition To Resource Division RTOR000097/2021-2022 769/BWD 07/02/2022 0 Resource Division 51.93 0.00 0 0
98 PURBA BARDHAMAN Burdwan Division Augmentation of Patuli PWSS for providing FHTC under Burdwan Divison. , SM/09718 Augmentation Load enhancement charges of Aug of Patuli water supply scheme under Burdwan Division, PHE Dte. BILL/00563/2023-2024 665/JJM 21/09/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LTD. 9.03 0.00 0 0
99 PURBA BARDHAMAN Burdwan Division Augmentation of Patuli PWSS for providing FHTC under Burdwan Divison. , SM/09718 Augmentation Sinking of 250 X 150mm dia Tube Well 150 mtr. Depth by D.R. Rig method using UPVC pipe (CD) and UPVC Deep Well Screen (RDS) at H.W & 2nd Tubewell site for PATULI (Zone-I & II) Piped Water Supply Scheme, Block - Purbasthali - II, Dist - Purba Bardhaman under Burdwan Division, PHE Dte. [2 + 2 = 4 Nos. GTW]. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000640/2021-2022 1621/BWD 21/03/2022 1025 AUXILIARY TUBE WELL DRILLERS 31.66 7.65 24.16 50
100 PURBA BARDHAMAN Burdwan Division Augmentation of Patuli PWSS for providing FHTC under Burdwan Divison. , SM/09718 Augmentation Augmentation of PATULI Water Supply Scheme (Zone-I & II) with LDS, Rising Main, FHTC work, Pump House & Boundary Wall of Purbasthali - II Block in Kalna Sub-Division, District - Purba Bardhaman under Burdwan Division, PHE. Dte. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000384/2021-2022 256/BWD 13/01/2022 180 IJABUL SEKH 407.57 365.05 89.57 80
101 PURBA BARDHAMAN Burdwan Division Augmentation of Patuli PWSS for providing FHTC under Burdwan Divison. , SM/09718 Augmentation Work Order for " Restoration of Pipeline and Other Allied Works i.c.w. Augmentation of PATULI(SM/09718) Piped Water Supply Scheme under PURBASTHALI-II Block,Kalna Sub-Division, District:- Purba Bardhaman." Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/001187/2023-2024 2191/KSD 15/03/2024 10 IYASIN DAFADAR 4.52 4.51 99.78 2
102 PURBA BARDHAMAN Burdwan Division Augmentation of Patuli PWSS for providing FHTC under Burdwan Divison. , SM/09718 Augmentation Quotation from WBSEDCL for new service connection of Augmentation of Patuli TW-3 Water supply scheme under Burdwan Division, PHE Dte. BILL/00666/2024-2025 826/JJM 18/09/2024 0 WBSEDCL 7.53 0.00 0 0
103 PURBA BARDHAMAN Burdwan Division Augmentation of Patuli PWSS for providing FHTC under Burdwan Divison. , SM/09718 Augmentation Different types of works involve in connection with Augmentation of JHAUDANGA (SM/16293), KASHIPUR (SM/16297), PATULI (SM/09718) & PARULIA (SM/09719) Piped water supply scheme under Purbasthali-II Block, Kalna Sub-Division, PHE Dte. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000163/2024-2025 2202/BWD 13/06/2024 631 MONDAL PRECISION PVT LTD 570.00 55.42 9.72 2
104 PURBA BARDHAMAN Burdwan Division Augmentation of Parulia PWSS for providing Functional House Hold Tap Connection (FHTC) , SM/09719 Augmentation Preparation of DPR for augmentation of Parulia W/S Scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. (Sl No-D) Assistant Engineer ORD/000582/2021-2022 216/KSD 24/02/2022 21 M/S R. DUTTA & CO. 2.84 2.79 98.24 1
105 PURBA BARDHAMAN Burdwan Division Augmentation of Parulia PWSS for providing Functional House Hold Tap Connection (FHTC) , SM/09719 Augmentation Supply of materials for different water supply scheme under Burdwan Division, PHE Dte. VCH/001578/2021-2022 1207/DW 10/03/2022 0 EXECUTIVE ENGINEER, RESOURCES DIVISION, P.H.E. DTE. 3,005.00 0.00 0 0
106 PURBA BARDHAMAN Burdwan Division Augmentation of Parulia PWSS for providing Functional House Hold Tap Connection (FHTC) , SM/09719 Augmentation Sinking of 250 X 150mm dia Tube Well 150 mtr. Depth by D.R. Rig method using UPVC pipe (CM) and UPVC Deep Well Screen (RMS) for 2nd TW Site of Aug. of PARULIA & its adjoining mouzas Piped Water Supply Scheme, Block ? Purbasthali ? II, Dist - Purba Bardhaman under Burdwan Division, PHE Dte. Assistant Engineer ORD/000549/2022-2023 5126/BWD 21/11/2022 30 M/S SYCHROTECH INDUSTRY 8.72 8.18 93.81 0
107 PURBA BARDHAMAN Burdwan Division Augmentation of Parulia PWSS for providing Functional House Hold Tap Connection (FHTC) , SM/09719 Augmentation Material Requisition To Resource Division RTOR000034/2021-2022 535/BWD 27/01/2022 0 Resource Division 14.55 0.00 0 0
108 PURBA BARDHAMAN Burdwan Division Augmentation of Parulia PWSS for providing Functional House Hold Tap Connection (FHTC) , SM/09719 Augmentation Material Requisition To Resource Division RTOR000080/2021-2022 604/BWD 28/01/2022 0 Resource Division 24.12 0.00 0 0
109 PURBA BARDHAMAN Burdwan Division Augmentation of Parulia PWSS for providing Functional House Hold Tap Connection (FHTC) , SM/09719 Augmentation Material Requisition To Resource Division RTOR000108/2021-2022 906/BWD 15/02/2022 0 Resource Division 6.93 0.00 0 0
110 PURBA BARDHAMAN Burdwan Division Augmentation of Parulia PWSS for providing Functional House Hold Tap Connection (FHTC) , SM/09719 Augmentation Material Requisition To Resource Division RTOR000240/2021-2022 1564/BWD 15/03/2022 0 Resource Division 0.37 0.00 0 0
111 PURBA BARDHAMAN Burdwan Division Augmentation of Parulia PWSS for providing Functional House Hold Tap Connection (FHTC) , SM/09719 Augmentation Material Requisition To Resource Division RTOR000039/2022-2023 4632/BWD 17/10/2022 0 Resource Division 12.32 0.00 0 0
112 PURBA BARDHAMAN Burdwan Division Augmentation of Parulia PWSS for providing Functional House Hold Tap Connection (FHTC) , SM/09719 Augmentation Augmentation of PARULIA Piped Water Supply Scheme with LDS, FHTC, Rising Main, Construction 300 Cum capacity OHR with 20.0 Mtr. Staging height inclusive of soil test & Construction of Boundary wall under Kalna Sub-Division, Block ¿ Purbasthali ¿ II, Dist. - Purba Bardhaman under Burdwan Division, PHE. Dte. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000437/2021-2022 699/BWD 02/02/2022 365 M/S ASHA CONSTRUCTION 407.54 379.29 93.07 100
113 PURBA BARDHAMAN Burdwan Division Augmentation of Parulia PWSS for providing Functional House Hold Tap Connection (FHTC) , SM/09719 Augmentation Different types of works involve in connection with Augmentation of JHAUDANGA (SM/16293), KASHIPUR (SM/16297), PATULI (SM/09718) & PARULIA (SM/09719) Piped water supply scheme under Purbasthali-II Block, Kalna Sub-Division, PHE Dte. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000163/2024-2025 2202/BWD 13/06/2024 631 MONDAL PRECISION PVT LTD 570.00 0.00 0 2
114 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED PARHATI PWSS TO ACCOMMODATE FHTC IN MEMARI-II BLOCK UNDER KATWA SUB DIVISION OF BURDWAN DIVISION IN PURBA BURDWAN DISTRICT , SM/08998 Augmentation Route Survey & Preparation of DPR for Parhati W/S Scheme under Memari-II Block under Burdwan Sub-Division under Burdwan Division PHE Dte. Sl No.13. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000502/2021-2022 188/BSD 31/01/2022 30 RADIANT 2.72 2.72 100 1
115 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED PARHATI PWSS TO ACCOMMODATE FHTC IN MEMARI-II BLOCK UNDER KATWA SUB DIVISION OF BURDWAN DIVISION IN PURBA BURDWAN DISTRICT , SM/08998 Augmentation Supply of materials for different water supply scheme under Burdwan Division, PHE Dte. VCH/001578/2021-2022 1207/DW 10/03/2022 0 EXECUTIVE ENGINEER, RESOURCES DIVISION, P.H.E. DTE. 3,005.00 0.00 0 0
116 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED PARHATI PWSS TO ACCOMMODATE FHTC IN MEMARI-II BLOCK UNDER KATWA SUB DIVISION OF BURDWAN DIVISION IN PURBA BURDWAN DISTRICT , SM/08998 Augmentation Supply and delivery of different dia. CIDF sluice valve for Augmentation of Paharhati, Nababhat, Shyamsundar & Dewandighi-Mirzapur Piped Water Supply Scheme within Burdwan Sub-Division under Burdwan Division, P.H.E. Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000519/2022-2023 4703/BWD 19/10/2022 20 SSPR VALVE MANUFACTURING PVT LTD. 14.45 3.61 24.98 1
117 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED PARHATI PWSS TO ACCOMMODATE FHTC IN MEMARI-II BLOCK UNDER KATWA SUB DIVISION OF BURDWAN DIVISION IN PURBA BURDWAN DISTRICT , SM/08998 Augmentation Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of PARHATI Piped Water Supply Scheme (Mouza- Akalia, Chandipur, Ganti, Kabastigiri, Kanpur, Kasipur, Madhupur, Parhati, Tajpur) of Burdwan Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000551/2022-2023 5193/BWD 24/11/2022 45 ANWESHA CONSTRUCTION 39.72 39.67 99.87 1
118 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED PARHATI PWSS TO ACCOMMODATE FHTC IN MEMARI-II BLOCK UNDER KATWA SUB DIVISION OF BURDWAN DIVISION IN PURBA BURDWAN DISTRICT , SM/08998 Augmentation Material Requisition To Resource Division RTOR000094/2021-2022 904/BWD 15/02/2022 0 Resource Division 11.38 0.00 0 0
119 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED PARHATI PWSS TO ACCOMMODATE FHTC IN MEMARI-II BLOCK UNDER KATWA SUB DIVISION OF BURDWAN DIVISION IN PURBA BURDWAN DISTRICT , SM/08998 Augmentation Material Requisition To Resource Division RTOR000052/2021-2022 549/BWD 27/01/2022 0 Resource Division 16.90 0.00 0 0
120 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED PARHATI PWSS TO ACCOMMODATE FHTC IN MEMARI-II BLOCK UNDER KATWA SUB DIVISION OF BURDWAN DIVISION IN PURBA BURDWAN DISTRICT , SM/08998 Augmentation Material Requisition To Resource Division RTOR000198/2021-2022 1521/BWD 15/03/2022 0 Resource Division 0.37 0.00 0 0
121 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED PARHATI PWSS TO ACCOMMODATE FHTC IN MEMARI-II BLOCK UNDER KATWA SUB DIVISION OF BURDWAN DIVISION IN PURBA BURDWAN DISTRICT , SM/08998 Augmentation Providing Balance Functional Household Tap Connection (848 nos FHTC) from existing distribution system within the command area of PARHATI Piped Water Supply Scheme at (Akalia, Chandipur, Ganti, Kabastigiri, Kanpur, Kasipur, Madhupur, Parhati, Tajpur) Mouza, Construction of boundary wall at head work site & 2nd T/W site under MEMARI-II Block of Burdwan Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000776/2022-2023 1363/BWD 22/03/2023 60 ASHOK KUMAR GHOSH 53.71 26.86 50.01 100
122 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED PARHATI PWSS TO ACCOMMODATE FHTC IN MEMARI-II BLOCK UNDER KATWA SUB DIVISION OF BURDWAN DIVISION IN PURBA BURDWAN DISTRICT , SM/08998 Augmentation Augmentation of PARHATI Piped Water Supply Scheme with LDS, Construction of 350 Cum capacity OHR with 20.0 Mtgr. Staging height inclusive of soil test & FHTC under Memari - II Block, District - Purba Bardhaman. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000597/2021-2022 1472/BWD 14/03/2022 365 ASHOK KUMAR GHOSH 361.27 334.18 92.5 100
123 PURBA BARDHAMAN Burdwan Division DETAILED PROJECT REPORT FOR AUGMENTATION F GROUND WATER BASED DHATRIGRAM PWSS TO ACCOMMODATE FHTC IN KALNA I BLOCK UNDER KALNA SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/10270 Augmentation Supply of materials for different water supply scheme under Burdwan Division, PHE Dte. VCH/001578/2021-2022 1207/DW 10/03/2022 0 EXECUTIVE ENGINEER, RESOURCES DIVISION, P.H.E. DTE. 3,005.00 0.00 0 0
124 PURBA BARDHAMAN Central Mechanical DETAILED PROJECT REPORT FOR AUGMENTATION F GROUND WATER BASED DHATRIGRAM PWSS TO ACCOMMODATE FHTC IN KALNA I BLOCK UNDER KALNA SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/10270 Augmentation Installation of a Voltage correcting device along with allied accessories at DHATRIGRAM Water Supply Scheme, Pump house-2 under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000122/2023-2024 497/CMSD-I 13/06/2023 21 SUDIKSHA CONSTRUCTION 3.48 3.48 100 0
125 PURBA BARDHAMAN Central Mechanical DETAILED PROJECT REPORT FOR AUGMENTATION F GROUND WATER BASED DHATRIGRAM PWSS TO ACCOMMODATE FHTC IN KALNA I BLOCK UNDER KALNA SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/10270 Augmentation Supply and Installation of Submersible Pumping Machinery for breakdown maintenance along with allied accessories for Tube Well no- 3A & Lowering of pumping machinery at T.W-3B at DHATRIGRAM and some other works at jot raghab & Deriapur Water Supply Scheme, under CMD, PHE Dte., Dist.- Purba-Bardhaman. ORD/000109/2023-2024 387/CMSD-I 19/04/2023 21 CHOUDHURY ENTERPRISE 0.69 0.69 100 0
126 PURBA BARDHAMAN Burdwan Division DETAILED PROJECT REPORT FOR AUGMENTATION F GROUND WATER BASED DHATRIGRAM PWSS TO ACCOMMODATE FHTC IN KALNA I BLOCK UNDER KALNA SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/10270 Augmentation Preparation of DPR for augmentation of Dhatrigram W/S Scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. (Sl No-C) Assistant Engineer ORD/000515/2021-2022 183/KSD 21/02/2022 21 LEMNISCATE 3.17 3.17 100 1
127 PURBA BARDHAMAN Burdwan Division DETAILED PROJECT REPORT FOR AUGMENTATION F GROUND WATER BASED DHATRIGRAM PWSS TO ACCOMMODATE FHTC IN KALNA I BLOCK UNDER KALNA SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/10270 Augmentation Restoration of existing concrete road and HDD Boring for laying distribution system of augmentation of Dhatrigram Water Supply Scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000079/2023-2024 2055/BWD 04/05/2023 60 PUSPA ENTERPRISE 38.67 38.67 100 100
128 PURBA BARDHAMAN Burdwan Division DETAILED PROJECT REPORT FOR AUGMENTATION F GROUND WATER BASED DHATRIGRAM PWSS TO ACCOMMODATE FHTC IN KALNA I BLOCK UNDER KALNA SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/10270 Augmentation Sinking of 250 X 150mm dia Tube Well 150 mtr. Depth by D.R. Rig method using UPVC pipe (CD) and UPVC Deep Well Screen (RDS) for Aug. of DHATRIGRAM Piped Water Supply Scheme, Block - Kalna - I, Dist - Purba Bardhaman under Burdwan Division, PHE Dte. [For 02 Nos. Tube well]. ORD/000219/2023-2024 2710/BWD 08/06/2023 45 AUXILIARY TUBE WELL DRILLERS 19.76 18.22 92.21 100
129 PURBA BARDHAMAN Burdwan Division DETAILED PROJECT REPORT FOR AUGMENTATION F GROUND WATER BASED DHATRIGRAM PWSS TO ACCOMMODATE FHTC IN KALNA I BLOCK UNDER KALNA SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/10270 Augmentation Material Requisition To Resource Division RTOR000178/2021-2022 1336/BWD 08/03/2022 0 Resource Division 70.03 0.00 0 0
130 PURBA BARDHAMAN Burdwan Division DETAILED PROJECT REPORT FOR AUGMENTATION F GROUND WATER BASED DHATRIGRAM PWSS TO ACCOMMODATE FHTC IN KALNA I BLOCK UNDER KALNA SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/10270 Augmentation Material Requisition To Resource Division RTOR000230/2021-2022 1552/BWD 15/03/2022 0 Resource Division 0.37 0.00 0 0
131 PURBA BARDHAMAN Burdwan Division DETAILED PROJECT REPORT FOR AUGMENTATION F GROUND WATER BASED DHATRIGRAM PWSS TO ACCOMMODATE FHTC IN KALNA I BLOCK UNDER KALNA SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/10270 Augmentation Material Requisition To Resource Division RTOR000187/2021-2022 1382/BWD 09/03/2022 0 Resource Division 3.88 0.00 0 0
132 PURBA BARDHAMAN Burdwan Division DETAILED PROJECT REPORT FOR AUGMENTATION F GROUND WATER BASED DHATRIGRAM PWSS TO ACCOMMODATE FHTC IN KALNA I BLOCK UNDER KALNA SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/10270 Augmentation Material Requisition To Resource Division RTOR000047/2022-2023 4850/BWD 20/10/2022 0 Resource Division 15.40 0.00 0 0
133 PURBA BARDHAMAN Central Mechanical DETAILED PROJECT REPORT FOR AUGMENTATION F GROUND WATER BASED DHATRIGRAM PWSS TO ACCOMMODATE FHTC IN KALNA I BLOCK UNDER KALNA SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/10270 Augmentation New service connection charges for Dhatrigram PWSS TW 4 BILL/01485/2023-2024 BP-2023-24-181 04/10/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 5.35 0.00 0 0
134 PURBA BARDHAMAN Central Mechanical DETAILED PROJECT REPORT FOR AUGMENTATION F GROUND WATER BASED DHATRIGRAM PWSS TO ACCOMMODATE FHTC IN KALNA I BLOCK UNDER KALNA SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/10270 Augmentation New service connection charges for Dhatrigram PWSS TW-7 BILL/01487/2023-2024 BP-2023-24-182 04/10/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 6.36 0.00 0 0
135 PURBA BARDHAMAN Burdwan Division DETAILED PROJECT REPORT FOR AUGMENTATION F GROUND WATER BASED DHATRIGRAM PWSS TO ACCOMMODATE FHTC IN KALNA I BLOCK UNDER KALNA SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/10270 Augmentation Shifting of pipe line of DHATRIGRAM Piped Water Supply Scheme for widening of road from Nabadwip more to Dhatrigram rail gate along the Dhatrigram-Burdwan road within Kalna Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000685/2023-2024 4281/BWD 29/09/2023 60 IYASIN DAFADAR 11.99 9.52 79.4 100
136 PURBA BARDHAMAN Central Mechanical DETAILED PROJECT REPORT FOR AUGMENTATION F GROUND WATER BASED DHATRIGRAM PWSS TO ACCOMMODATE FHTC IN KALNA I BLOCK UNDER KALNA SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/10270 Augmentation Additional Quotation for new service connection for Dhatrigram Daspara PWSS . BILL/00310/2024-2025 BP-2024-25-151 21/06/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 0.45 0.00 0 0
137 PURBA BARDHAMAN Central Mechanical DETAILED PROJECT REPORT FOR AUGMENTATION F GROUND WATER BASED DHATRIGRAM PWSS TO ACCOMMODATE FHTC IN KALNA I BLOCK UNDER KALNA SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/10270 Augmentation Supply and installation of Electro-Magnetic flow meter at Bazar Mahammadpur, Dhatrigram, Arjunpukur & others water supply scheme under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000590/2024-2025 3105/CMD 11/12/2024 60 SHREE BISHNU CONSTRUCTION 19.77 0.00 0 0
138 PURBA BARDHAMAN Burdwan Division DETAILED PROJECT REPORT FOR AUGMENTATION F GROUND WATER BASED DHATRIGRAM PWSS TO ACCOMMODATE FHTC IN KALNA I BLOCK UNDER KALNA SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/10270 Augmentation Augmentation of Dhatrigram Piped Water Supply Scheme with LDS, FHTC, Rising main, Construction of new 500 cum capacity OHR with 20.0 mtr. Staging height with soil investigation including construction of 5(five) nos. switch-room(5.40mx3.6m), construction of five nos. new boundary wall for new TW sites & repairing of existing OHR, switch room & boundary wall under Kalna-I Block, District:- Purba-Burdwan. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000145/2022-2023 3046/BWD 08/07/2022 1029 PUSPA ENTERPRISE 697.50 574.11 82.31 70
139 PURBA BARDHAMAN Burdwan Division Augmentation of ground water based KHANDOGHOSH PWSS to accommodate FHTC in Khandoghosh block under Burdwan Sub Division of Burdwan Division in Purba Bardhaman District , SM/09404 Augmentation Route Survey & Preparation of DPR for Khandaghosh W/S Scheme under Khandaghosh Block under Burdwan Sub-Division under Burdwan Division PHE Dte. Sl No.15. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000504/2021-2022 190/BSD 31/01/2022 30 RADIANT 3.01 3.01 100 1
140 PURBA BARDHAMAN Burdwan Division Augmentation of ground water based KHANDOGHOSH PWSS to accommodate FHTC in Khandoghosh block under Burdwan Sub Division of Burdwan Division in Purba Bardhaman District , SM/09404 Augmentation Dismantling of concrete road for Augmentation of KHANDAGHOSH Pipe water supply scheme (Mouza: Khandaghosh, Lodna, Barisiali, Kapshit, Nabagram, Metedanga) at Khandaghosh Block of Burdwan Sub-Division under Burdwan Division, PHE Dte. Gr.B. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000440/2022-2023 1466/BSD 25/08/2022 45 JMD ENGINEERING INFRASTRUCTURE COMPANY 4.84 4.69 96.9 1
141 PURBA BARDHAMAN Burdwan Division Augmentation of ground water based KHANDOGHOSH PWSS to accommodate FHTC in Khandoghosh block under Burdwan Sub Division of Burdwan Division in Purba Bardhaman District , SM/09404 Augmentation Supply of materials for different water supply scheme under Burdwan Division, PHE Dte. VCH/001578/2021-2022 1207/DW 10/03/2022 0 EXECUTIVE ENGINEER, RESOURCES DIVISION, P.H.E. DTE. 3,005.00 0.00 0 0
142 PURBA BARDHAMAN Burdwan Division Augmentation of ground water based KHANDOGHOSH PWSS to accommodate FHTC in Khandoghosh block under Burdwan Sub Division of Burdwan Division in Purba Bardhaman District , SM/09404 Augmentation Supply and delivery of different dia. CIDF sluice valve for Augmentation of KHANDAGHOSH Piped Water Supply Scheme under Burdwan Division, P.H.E. Dte._SL. No. 07 Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000618/2021-2022 141/AE/HQ 16/03/2022 10 MAKALI ENGINEERING CORPORATION 4.52 0.00 0 0
143 PURBA BARDHAMAN Burdwan Division Augmentation of ground water based KHANDOGHOSH PWSS to accommodate FHTC in Khandoghosh block under Burdwan Sub Division of Burdwan Division in Purba Bardhaman District , SM/09404 Augmentation Augmentation of KHANDAGHOSH Piped Water Supply Scheme with LDS, FHTC, Rising Main, Construction of 600 Cum capacity OHR with 20.0 Mtr. Staging height inclusive of soil investigation & construction of boundary wall at Head works, 2nd TW & 3rd TW site under Khandaghosh Block, District - Purba Bardhaman. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000017/2022-2023 1967/BWD 12/04/2022 365 M/S JAN MAHAMMAD 666.04 665.97 99.99 100
144 PURBA BARDHAMAN Burdwan Division Augmentation of ground water based KHANDOGHOSH PWSS to accommodate FHTC in Khandoghosh block under Burdwan Sub Division of Burdwan Division in Purba Bardhaman District , SM/09404 Augmentation Material Requisition To Resource Division RTOR000047/2021-2022 565/BWD 27/01/2022 0 Resource Division 25.72 0.00 0 0
145 PURBA BARDHAMAN Burdwan Division Augmentation of ground water based KHANDOGHOSH PWSS to accommodate FHTC in Khandoghosh block under Burdwan Sub Division of Burdwan Division in Purba Bardhaman District , SM/09404 Augmentation Material Requisition To Resource Division RTOR000205/2021-2022 1528/BWD 15/03/2022 0 Resource Division 0.37 0.00 0 0
146 PURBA BARDHAMAN Burdwan Division Augmentation of ground water based KHANDOGHOSH PWSS to accommodate FHTC in Khandoghosh block under Burdwan Sub Division of Burdwan Division in Purba Bardhaman District , SM/09404 Augmentation Material Requisition To Resource Division RTOR000096/2021-2022 951/BWD 17/02/2022 0 Resource Division 59.29 0.00 0 0
147 PURBA BARDHAMAN Burdwan Division Augmentation of ground water based KHANDOGHOSH PWSS to accommodate FHTC in Khandoghosh block under Burdwan Sub Division of Burdwan Division in Purba Bardhaman District , SM/09404 Augmentation Material Requisition To Resource Division RTOR000015/2022-2023 3278/BWD 29/07/2022 0 Resource Division 34.57 0.00 0 0
148 PURBA BARDHAMAN Burdwan Division Augmentation of ground water based KHANDOGHOSH PWSS to accommodate FHTC in Khandoghosh block under Burdwan Sub Division of Burdwan Division in Purba Bardhaman District , SM/09404 Augmentation Construction of Boundary wall at Head Works Site of Aug. of KHANDAGHOSH Water Supply Scheme under KHANDAGHOSH Block of Burdwan Division, PHE Dte. (Length -210.00 Mtr, Col-80 Nos). Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000534/2023-2024 3631/BWD 21/08/2023 60 ROY ASSOCIATE 28.73 28.70 99.9 100
149 PURBA BARDHAMAN Burdwan Division Augmentation of ground water based KHANDOGHOSH PWSS to accommodate FHTC in Khandoghosh block under Burdwan Sub Division of Burdwan Division in Purba Bardhaman District , SM/09404 Augmentation Restoration work of hard shoulder at Badulia Khandaghosh Road from 12.00 to 13.00 km (L/S) due to laying of water supply pipeline by PHE Dte. under Sadarghat Highway Sub-Division No.-I of Burdwan South Highway Division, P.W. Roads Dte. in the district of Purba Bardhaman. BILL/00362/2024-2025 565/JJM 23/07/2024 0 EXECUTIVE ENGINEER BURDWAN SOUTH HIGHWAY DIVISION P.W. (ROADS) DTE. 8.12 0.00 0 0
150 PURBA BARDHAMAN Burdwan Division Augmentation of ground water based KHANDOGHOSH PWSS to accommodate FHTC in Khandoghosh block under Burdwan Sub Division of Burdwan Division in Purba Bardhaman District , SM/09404 Augmentation Providing Balance Functional Household Tap Connection (372 nos FHTC) from existing distribution system within the command area of KHANDAGHOSH Piped Water Supply Scheme at (Khandaghosh, Lodna, Metedanga, Nabagram, Kapsit, Barsiali) Mouza under KHANDAGHOSH Block of Burdwan Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000195/2023-2024 2689/BWD 08/06/2023 30 KAUSHIK RAY 16.73 0.00 0 100
151 PURBA BARDHAMAN Purbasthali-I Burdwan Division RAJAPUR PIPED WATER SUPPLY SCHEME , SM/14021 New Material Requisition To Resource Division RTOR000086/2022-2023 1241/BWD 17/03/2023 0 Resource Division 3.55 0.00 0 0
152 PURBA BARDHAMAN Purbasthali-I Burdwan Division RAJAPUR PIPED WATER SUPPLY SCHEME , SM/14021 New Material Requisition To Resource Division RTOR000477/2023-2024 4001/BWD 08/09/2023 0 Resource Division 1.09 0.00 0 0
153 PURBA BARDHAMAN Purbasthali-I Central Mechanical RAJAPUR PIPED WATER SUPPLY SCHEME , SM/14021 New Damage restoration charges in connection with WBSEDCL electrification under Rajapur PWSS BILL/01477/2023-2024 BP-2023-24-176 29/09/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 0.10 0.00 0 0
154 PURBA BARDHAMAN Purbasthali-I Central Mechanical RAJAPUR PIPED WATER SUPPLY SCHEME , SM/14021 New New service connection charges for Rajapur PWSS TW-1 BILL/01090/2023-2024 BP-2023-24-120 17/08/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 8.97 0.00 0 0
155 PURBA BARDHAMAN Purbasthali-I Central Mechanical RAJAPUR PIPED WATER SUPPLY SCHEME , SM/14021 New New service connection charges for Rajapur PWSS TW-2 BILL/01091/2023-2024 BP-2023-24-121 17/08/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 8.51 0.00 0 0
156 PURBA BARDHAMAN Purbasthali-I Burdwan Division RAJAPUR PIPED WATER SUPPLY SCHEME , SM/14021 New Material Requisition To Resource Division RTOR000807/2023-2024 298/BWD 24/01/2024 0 Resource Division 8.86 0.00 0 0
157 PURBA BARDHAMAN Purbasthali-I Central Mechanical RAJAPUR PIPED WATER SUPPLY SCHEME , SM/14021 New Addl. New service connection charges for Rajapur PWSS TW-1 BILL/01730/2023-2024 BP-2023-24-245 07/12/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 0.76 0.00 0 0
158 PURBA BARDHAMAN Purbasthali-I Burdwan Division RAJAPUR PIPED WATER SUPPLY SCHEME , SM/14021 New RAJAPUR Piped Water Supply Scheme with sinking of Tube-well, LDS, Rising Main, FHTC, construction of switch rooms & boundary walls with gates and land development, drain and internal pathway at different TW site under PURBASTHALI-I Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000656/2022-2023 359/BWD 30/01/2023 519 PABITRA KUMAR SAMANTA 116.35 92.70 79.67 90
159 PURBA BARDHAMAN Purbasthali-I Burdwan Division RAJAPUR PIPED WATER SUPPLY SCHEME , SM/14021 New Laying of rising main along with crossing of pipeline by HDD/Jack pushing method with other allied work in connection with augmentation of Ganganandapur PWSS (SM/09411) & Rajapur PWSS (SM/ 14021), Purbasthali-I block under Kalna Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000278/2024-2025 2710/BWD 11/07/2024 264 MANASH GHOSH 81.34 65.34 80.33 60
160 PURBA BARDHAMAN Manteswar Burdwan Division GROUND WATER SUPPLY BASED PIPED WATER SUPPLY SCHEME FOR SUTRA PWSS IN MANTESHWAR BLOCK OF PURBA BURDWAN DISTRICT UNDER BURDWAN DIVISION, P.H.E. DTE. , SM/13280 New Material Requisition To Resource Division RTOR000090/2022-2023 1243/BWD 17/03/2023 0 Resource Division 10.30 0.00 0 0
161 PURBA BARDHAMAN Manteswar Burdwan Division GROUND WATER SUPPLY BASED PIPED WATER SUPPLY SCHEME FOR SUTRA PWSS IN MANTESHWAR BLOCK OF PURBA BURDWAN DISTRICT UNDER BURDWAN DIVISION, P.H.E. DTE. , SM/13280 New Material Requisition To Resource Division RTOR000101/2022-2023 1632/BWD 06/04/2023 0 Resource Division 11.55 0.00 0 0
162 PURBA BARDHAMAN Manteswar Burdwan Division GROUND WATER SUPPLY BASED PIPED WATER SUPPLY SCHEME FOR SUTRA PWSS IN MANTESHWAR BLOCK OF PURBA BURDWAN DISTRICT UNDER BURDWAN DIVISION, P.H.E. DTE. , SM/13280 New Material Requisition To Resource Division RTOR000618/2023-2024 4885/BWD 10/11/2023 0 Resource Division 33.21 0.00 0 0
163 PURBA BARDHAMAN Manteswar Central Mechanical GROUND WATER SUPPLY BASED PIPED WATER SUPPLY SCHEME FOR SUTRA PWSS IN MANTESHWAR BLOCK OF PURBA BURDWAN DISTRICT UNDER BURDWAN DIVISION, P.H.E. DTE. , SM/13280 New New service connection charges for Sutra PWSS TW-1 BILL/00792/2023-2024 BP-2023-24-80 25/07/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 2.89 0.00 0 0
164 PURBA BARDHAMAN Manteswar Central Mechanical GROUND WATER SUPPLY BASED PIPED WATER SUPPLY SCHEME FOR SUTRA PWSS IN MANTESHWAR BLOCK OF PURBA BURDWAN DISTRICT UNDER BURDWAN DIVISION, P.H.E. DTE. , SM/13280 New New service connection charges for Sutra PWSS TW-2 BILL/00793/2023-2024 BP-2023-24-81 25/07/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.84 0.00 0 0
165 PURBA BARDHAMAN Manteswar Burdwan Division GROUND WATER SUPPLY BASED PIPED WATER SUPPLY SCHEME FOR SUTRA PWSS IN MANTESHWAR BLOCK OF PURBA BURDWAN DISTRICT UNDER BURDWAN DIVISION, P.H.E. DTE. , SM/13280 New SUTRA Piped Water Supply Scheme with sinking of Tube-well, LDS, Rising Main, FHTC, Construction of 250 cum capacity RCC OHR with 20.0 mtr. with Staging height including soil investigation & construction of switch-rooms & boundary walls at different TW site under Monteswar Block, District:- Purba-Bardhaman [NEW SCHEME]_2ND CALL Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000743/2022-2023 1166/BWD 14/03/2023 365 B.B.C. ENTERPRISE 404.06 343.67 85.05 70
166 PURBA BARDHAMAN Manteswar Central Mechanical GROUND WATER SUPPLY BASED PIPED WATER SUPPLY SCHEME FOR SUTRA PWSS IN MANTESHWAR BLOCK OF PURBA BURDWAN DISTRICT UNDER BURDWAN DIVISION, P.H.E. DTE. , SM/13280 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at Sutra Water Supply Scheme [ Block- Monteswar ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000185/2023-2024 2967/CMD 17/07/2023 30 M.S. ENTERPRISE 27.67 1.09 3.94 100
167 PURBA BARDHAMAN Manteswar Burdwan Division GROUND WATER SUPPLY BASED PIPED WATER SUPPLY SCHEME FOR SUTRA PWSS IN MANTESHWAR BLOCK OF PURBA BURDWAN DISTRICT UNDER BURDWAN DIVISION, P.H.E. DTE. , SM/13280 New Laying of additional pipeline and providing FHTC at SUTRA water supply scheme under Kalna Sub-Division, Burdwan Division, PHE Dte. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000157/2024-2025 2175/BWD 12/06/2024 120 DUBE ENTERPRISE 42.09 22.92 54.45 40
168 PURBA BARDHAMAN Manteswar Central Mechanical GROUND WATER SUPPLY BASED PIPED WATER SUPPLY SCHEME FOR SUTRA PWSS IN MANTESHWAR BLOCK OF PURBA BURDWAN DISTRICT UNDER BURDWAN DIVISION, P.H.E. DTE. , SM/13280 New SUPPLY & INSTALLATION WORKS FOR SUTRA PWSS BILL/02623/2023-2024 BP-2023-24-558 21/02/2024 0 M.S. ENTERPRISE 21.99 0.00 0 0
169 PURBA BARDHAMAN Manteswar Burdwan Division GROUND WATER SUPPLY BASED PIPED WATER SUPPLY SCHEME FOR SUTRA PWSS IN MANTESHWAR BLOCK OF PURBA BURDWAN DISTRICT UNDER BURDWAN DIVISION, P.H.E. DTE. , SM/13280 New Balance work for laying of pipeline, providing FHTC & other allied works in connection with Augmentation of MONTESWAR PWSS & SUTRA PWSS (SM/13280) under Kalna Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000980/2024-2025 3572/BWD 27/09/2024 181 BAKSHI ENTERPRISE 51.14 0.00 0 30
170 PURBA BARDHAMAN Manteswar Central Mechanical GROUND WATER SUPPLY BASED PIPED WATER SUPPLY SCHEME FOR SUTRA PWSS IN MANTESHWAR BLOCK OF PURBA BURDWAN DISTRICT UNDER BURDWAN DIVISION, P.H.E. DTE. , SM/13280 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Sutra & others water supply scheme under Monteswar Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000068/2024-2025 2396/CMD 02/08/2024 455 SINHA ELECTRICALS 78.06 0.00 0 20
171 PURBA BARDHAMAN Raina-II Burdwan Division CHAK CHANDAN PIPED WATER SUPPLY SCHEME , SM/13281 New Material Requisition To Resource Division RTOR000267/2023-2024 1898/BWD 12/05/2023 0 Resource Division 11.69 0.00 0 0
172 PURBA BARDHAMAN Raina-II Burdwan Division CHAK CHANDAN PIPED WATER SUPPLY SCHEME , SM/13281 New Material Requisition To Resource Division RTOR000504/2023-2024 4028/BWD 08/09/2023 0 Resource Division 8.29 0.00 0 0
173 PURBA BARDHAMAN Raina-II Burdwan Division CHAK CHANDAN PIPED WATER SUPPLY SCHEME , SM/13281 New Material Requisition To Resource Division RTOR000660/2023-2024 5118/BWD 23/11/2023 0 Resource Division 20.46 0.00 0 0
174 PURBA BARDHAMAN Raina-II Central Mechanical CHAK CHANDAN PIPED WATER SUPPLY SCHEME , SM/13281 New New service connection charges for Chak Chandan PWSS TW-1 BILL/01667/2023-2024 BP-2023-24-220 10/11/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 4.07 0.00 0 0
175 PURBA BARDHAMAN Raina-II Central Mechanical CHAK CHANDAN PIPED WATER SUPPLY SCHEME , SM/13281 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Satinandi,Sanko & others water supply scheme under Galsi-1 Block ; Serpur, Uchalan & others water supply scheme under Raina-2 Block and maro, loapur & others water supply scheme under Galsi-2 block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000397/2024-2025 2751/CMD 24/09/2024 90 ORIENTAL ENGINEERING CO. 88.42 0.00 0 0
176 PURBA BARDHAMAN Raina-II Central Mechanical CHAK CHANDAN PIPED WATER SUPPLY SCHEME , SM/13281 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at Chak Chandan Water Supply Scheme [ Block- Raina-2 ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000726/2023-2024 4037/CMD 29/08/2023 30 M/S. S.R. ENTERPRISE 28.98 22.75 78.5 96
177 PURBA BARDHAMAN Raina-II Central Mechanical CHAK CHANDAN PIPED WATER SUPPLY SCHEME , SM/13281 New Emergency installation (for urgent FHTC) at Chak Chandan Water Supply Scheme PH 1 (part-3) under CMD, PHE Dte., Dist.- Purba-Bardhaman ASSISTANT ENGINEER JUNIOR ENGINEER ORD/001675/2023-2024 82/CMSD 15/01/2024 12 CHOUDHURY ENTERPRISE 0.88 0.88 100 100
178 PURBA BARDHAMAN Raina-II Central Mechanical CHAK CHANDAN PIPED WATER SUPPLY SCHEME , SM/13281 New New electric connection for Chakchandan PWSS, PH-2. BILL/01874/2023-2024 BP-2023-24-340 11/01/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 4.49 0.00 0 0
179 PURBA BARDHAMAN Raina-II Burdwan Division CHAK CHANDAN PIPED WATER SUPPLY SCHEME , SM/13281 New Different works related (sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of different capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site) to UCHALAN, CHAK CHANDAN, SERPUR & KATNABIL Piped Water Supply Scheme under Raina II Block, District:- Purba Bardhaman [NEW SCHEME] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000367/2023-2024 3076/BWD 18/07/2023 806 SK ALIM 1,307.56 216.37 16.55 75
180 PURBA BARDHAMAN Raina-II Burdwan Division CHAK CHANDAN PIPED WATER SUPPLY SCHEME , SM/13281 New Continuation Work Order for Supply of one No.Diesel Driven Ambassador Car No. WB:41H-4009 on hire basis for the office of the Assistant Engineer,Burdwan Sub-Division,PHE Dte(Period from 01-03-2025 to 31.05.2025) Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/001407/2024-2025 457/BSD 28/02/2025 90 SK. ASFIA 1.20 0.00 0 100
181 PURBA BARDHAMAN Burdwan-I Central Mechanical KALIGRAM PIPED WATER SUPPLY SCHEME , SM/13940 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at Kaligram Water Supply Scheme [ Block- Burdwan-1 ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER Junior Engineer ORD/000655/2023-2024 3998/CMD 29/08/2023 30 MITRA ENTERPRISE 28.83 0.00 0 0
182 PURBA BARDHAMAN Burdwan-I Burdwan Division KALIGRAM PIPED WATER SUPPLY SCHEME , SM/13940 New Material Requisition To Resource Division RTOR000096/2023-2024 1962/BWD 25/04/2023 0 Resource Division 1.64 0.00 0 0
183 PURBA BARDHAMAN Burdwan-I Burdwan Division KALIGRAM PIPED WATER SUPPLY SCHEME , SM/13940 New Material Requisition To Resource Division RTOR000300/2023-2024 2197/BWD 12/05/2023 0 Resource Division 18.63 0.00 0 0
184 PURBA BARDHAMAN Burdwan-I Burdwan Division KALIGRAM PIPED WATER SUPPLY SCHEME , SM/13940 New Material Requisition To Resource Division RTOR000719/2023-2024 5272/BWD 30/11/2023 0 Resource Division 21.07 0.00 0 0
185 PURBA BARDHAMAN Burdwan-I Central Mechanical KALIGRAM PIPED WATER SUPPLY SCHEME , SM/13940 New New service connection charges for Kaligram PWSS TW-1 BILL/01676/2023-2024 BP-2023-24-225 10/11/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.91 0.00 0 0
186 PURBA BARDHAMAN Burdwan-I Central Mechanical KALIGRAM PIPED WATER SUPPLY SCHEME , SM/13940 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at MALKITA & others water supply scheme under Bardhaman-I Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman ASSISTANT ENGINEER Junior Engineer ORD/000066/2024-2025 2388/CMD 02/08/2024 90 ELECTRICAL & MECHANICAL ENGINEERING CORPORATION 55.95 0.00 0 0
187 PURBA BARDHAMAN Burdwan-I Central Mechanical KALIGRAM PIPED WATER SUPPLY SCHEME , SM/13940 New Quotation for new service connection at KALIGRAM W/S Scheme PH-II. BILL/01815/2023-2024 BP-2023-24-305 30/12/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.57 0.00 0 0
188 PURBA BARDHAMAN Burdwan-I Burdwan Division KALIGRAM PIPED WATER SUPPLY SCHEME , SM/13940 New Different works related (sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of different capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site) to KALIGRAM & PALITPUR Piped Water Supply Scheme under Burdwan I Block, District:- Purba Bardhaman [NEW SCHEME] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000499/2023-2024 3532/BWD 10/08/2023 722 SUPRITI ENTERPRISE 704.50 127.60 18.11 50
189 PURBA BARDHAMAN Khandaghosh Burdwan Division CHAGRAM PIPED WATER SUPPLY SCHEME , SM/13941 New Material Requisition To Resource Division RTOR000104/2023-2024 1965/BWD 26/04/2023 0 Resource Division 18.80 0.00 0 0
190 PURBA BARDHAMAN Khandaghosh Burdwan Division CHAGRAM PIPED WATER SUPPLY SCHEME , SM/13941 New Material Requisition To Resource Division RTOR000190/2023-2024 2155/BWD 10/05/2023 0 Resource Division 10.42 0.00 0 0
191 PURBA BARDHAMAN Khandaghosh Burdwan Division CHAGRAM PIPED WATER SUPPLY SCHEME , SM/13941 New Material Requisition To Resource Division RTOR000712/2023-2024 5043/BWD 23/11/2023 0 Resource Division 20.46 0.00 0 0
192 PURBA BARDHAMAN Khandaghosh Central Mechanical CHAGRAM PIPED WATER SUPPLY SCHEME , SM/13941 New New service connection charges for Chagram PWSS TW-1 BILL/00819/2023-2024 BP-2023-24-95 02/08/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.24 0.00 0 0
193 PURBA BARDHAMAN Khandaghosh Central Mechanical CHAGRAM PIPED WATER SUPPLY SCHEME , SM/13941 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at Chagram Water Supply Scheme [ Block- Khandoghosh ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER Junior Engineer ORD/000213/2023-2024 3068/CMD 21/07/2023 30 PADMA ENGINEERING CO. 28.96 23.67 81.73 100
194 PURBA BARDHAMAN Khandaghosh Central Mechanical CHAGRAM PIPED WATER SUPPLY SCHEME , SM/13941 New New Electric connection Chagram W/S PH-II BILL/01791/2023-2024 BP-2023-24-306 30/12/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.27 0.00 0 0
195 PURBA BARDHAMAN Khandaghosh Burdwan Division CHAGRAM PIPED WATER SUPPLY SCHEME , SM/13941 New Different works related (sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of different capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site) to CHAGRAM & KHEJURHATI Piped Water Supply Scheme under Khandaghosh Block, District:- Purba Bardhaman [NEW SCHEME] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer1, Durgapur Sub-Division, PHE Dte.,Junior Engineer2, Durgapur Sub-Division, PHE Dte. ORD/000083/2023-2024 2080/BWD 04/05/2023 698 KHAN ENTERPRISE 688.15 332.98 48.39 58
196 PURBA BARDHAMAN Khandaghosh Burdwan Division CHAGRAM PIPED WATER SUPPLY SCHEME , SM/13941 New Balance work for providing Functional Household Tap Connection (FHTC) within command area GOPALBERA & CHAGRAM W/S. Scheme of Khandaghosh Block under Burdwan Divn., PHE. Dte. Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer1, Durgapur Sub-Division, PHE Dte. ORD/000959/2024-2025 4438/BWD 18/12/2024 253 DUBE ENTERPRISE 143.33 0.00 0 70
197 PURBA BARDHAMAN Khandaghosh Central Mechanical CHAGRAM PIPED WATER SUPPLY SCHEME , SM/13941 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at KHEJURHATI & others water supply scheme under Khandoghosh Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman ASSISTANT ENGINEER Junior Engineer ORD/000071/2024-2025 2391/CMD 02/08/2024 90 C.M. ENTERPRISE 45.81 0.00 0 10
198 PURBA BARDHAMAN Mangolkote Burdwan Division KOTALGHOSH PIPED WATER SUPPLY SCHEME , SM/14062 New Material Requisition To Resource Division RTOR000113/2023-2024 1965/BWD 26/04/2023 0 Resource Division 1.92 0.00 0 0
199 PURBA BARDHAMAN Mangolkote Burdwan Division KOTALGHOSH PIPED WATER SUPPLY SCHEME , SM/14062 New Material Requisition To Resource Division RTOR000387/2023-2024 2197/BWD 12/05/2023 0 Resource Division 1.48 0.00 0 0
200 PURBA BARDHAMAN Mangolkote Central Mechanical KOTALGHOSH PIPED WATER SUPPLY SCHEME , SM/14062 New New service connection charges for Kotalghosh PWSS TW-1 BILL/01482/2023-2024 BP-2023-24-183 04/10/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 6.28 0.00 0 0
201 PURBA BARDHAMAN Mangolkote Central Mechanical KOTALGHOSH PIPED WATER SUPPLY SCHEME , SM/14062 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Jabagram & others water supply scheme under Mangalkote Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. Driller In-Charge Junior Engineer ORD/000118/2024-2025 2590/CMD 27/08/2024 90 M/S SAJAHAN CHOWDHURY 62.06 0.00 0 0
202 PURBA BARDHAMAN Mangolkote Burdwan Division KOTALGHOSH PIPED WATER SUPPLY SCHEME , SM/14062 New Material Requisition To Resource Division RTOR000812/2023-2024 306/BWD 24/01/2024 0 Resource Division 20.47 0.00 0 0
203 PURBA BARDHAMAN Mangolkote Central Mechanical KOTALGHOSH PIPED WATER SUPPLY SCHEME , SM/14062 New NEW SERVICE CONNECTION FOR KOTALGHOSH PWSS TW 2. BILL/02487/2023-2024 BP-2023-24-540 15/02/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 6.46 0.00 0 0
204 PURBA BARDHAMAN Mangolkote Central Mechanical KOTALGHOSH PIPED WATER SUPPLY SCHEME , SM/14062 New Additional quotation in second time against additional works at Kotalghosh PWSS TW-2. BILL/00699/2024-2025 BP-2024-25-269 23/08/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 1.87 0.00 0 0
205 PURBA BARDHAMAN Mangolkote Burdwan Division KOTALGHOSH PIPED WATER SUPPLY SCHEME , SM/14062 New KOTALGHOSH Piped Water Supply Scheme with sinking of Tube-well, LDS, Rising Main, FHTC, Construction of 200 cum capacity RCC OHR with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drain and internal pathway at different TW site under Mongalkote Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer JUNIOR ENGINEER KATWA SUB-DIVISION PHE DTE ORD/000498/2023-2024 3528/BWD 10/08/2023 600 BRINDABAN KONAR 325.17 271.02 83.35 5
206 PURBA BARDHAMAN Mangolkote Burdwan Division KOTALGHOSH PIPED WATER SUPPLY SCHEME , SM/14062 New Continuation work order for Hiring of one no Diesel Motor Cab (BS-VI) including the cost of fuel . mobile & other charges for the inspection of the different projects of JJM for the office of the Assistant Engineer, Katwa Sub-Division, PHE Dte. (Period:- 01/09/2025 to 28/02/2026) ORD/000723/2025-2026 1907/KTS 01/09/2025 181 HAMID SK 1.84 0.00 0 0
207 PURBA BARDHAMAN Burdwan-II Burdwan Division HARIGRAM PIPED WATER SUPPLY SCHEME , SM/13292 New Material Requisition To Resource Division RTOR000071/2022-2023 1252/BWD 17/03/2023 0 Resource Division 7.50 0.00 0 0
208 PURBA BARDHAMAN Burdwan-II Burdwan Division HARIGRAM PIPED WATER SUPPLY SCHEME , SM/13292 New Material Requisition To Resource Division RTOR000108/2022-2023 1643/BWD 06/04/2023 0 Resource Division 1.79 0.00 0 0
209 PURBA BARDHAMAN Burdwan-II Burdwan Division HARIGRAM PIPED WATER SUPPLY SCHEME , SM/13292 New Material Requisition To Resource Division RTOR000717/2023-2024 5267/BWD 30/11/2023 0 Resource Division 21.07 0.00 0 0
210 PURBA BARDHAMAN Burdwan-II Central Mechanical HARIGRAM PIPED WATER SUPPLY SCHEME , SM/13292 New New service connection charges for Harigram PWSS TW-2 BILL/01707/2023-2024 BP-2023-24-236 06/12/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 7.69 0.00 0 0
211 PURBA BARDHAMAN Burdwan-II Central Mechanical HARIGRAM PIPED WATER SUPPLY SCHEME , SM/13292 New New service connection charges for Harigram PWSS TW-1 BILL/01471/2023-2024 BP-2023-24-169 27/09/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 4.50 0.00 0 0
212 PURBA BARDHAMAN Burdwan-II Burdwan Division HARIGRAM PIPED WATER SUPPLY SCHEME , SM/13292 New Continuation order for "Supply of one No. Diesel Driven Ambassador Car on hire basis for the office of the Assistant Engineer, Burdwan Sub-Division, PHE Dte for the period of 01.12.2023 to 31.05.2024 Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/001007/2023-2024 2751/BSD 28/11/2023 183 SK.ASFIA 2.40 0.40 16.67 70
213 PURBA BARDHAMAN Burdwan-II Central Mechanical HARIGRAM PIPED WATER SUPPLY SCHEME , SM/13292 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at Harigram Water Supply Scheme [ Block- Burdwan-2 ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER Junior Engineer ORD/000590/2023-2024 3940/CMD 23/08/2023 30 CHOUDHURY ENTERPRISE 28.90 23.82 82.42 100
214 PURBA BARDHAMAN Burdwan-II Central Mechanical HARIGRAM PIPED WATER SUPPLY SCHEME , SM/13292 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at KUSHA & others water supply scheme under Bardhaman-II Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman ASSISTANT ENGINEER Junior Engineer ORD/000065/2024-2025 2389/CMD 02/08/2024 90 DILIP MAHATO 53.14 0.00 0 12
215 PURBA BARDHAMAN Burdwan-II Central Mechanical HARIGRAM PIPED WATER SUPPLY SCHEME , SM/13292 New Supply and installation of Electro-Magnetic flow meter at HARIGRAM, KUCHUT & others water supply scheme under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. ASSISTANT ENGINEER Junior Engineer ORD/000564/2024-2025 3103/CMD 11/12/2024 60 S DUTTA 15.06 0.00 0 0
216 PURBA BARDHAMAN Burdwan-II Burdwan Division HARIGRAM PIPED WATER SUPPLY SCHEME , SM/13292 New Allied works (OHR, FHTC, internal pathway, approach road and road restoration) for HARIGRAM PWSS under Bardhaman II Block within Burdwan Division, PHE. Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000722/2025-2026 1405/BWD 16/05/2025 90 S.R. ENTERPRISE 14.32 0.00 0 0
217 PURBA BARDHAMAN Burdwan-II Burdwan Division HARIGRAM PIPED WATER SUPPLY SCHEME , SM/13292 New HARIGRAM Piped Water Supply Scheme with Sinking of tube-well, LDS, Rising Main, FHTC, Construction of 150 cum capacity RCC OHR with 20.0 mtr. with Staging height including soil investigation & construction of switch-rooms & boundary walls at different TW site under Burdwan-II Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. Junior Engineer, Burdwan Sadar Sub-Division ORD/000684/2022-2023 481/BWD 08/02/2023 693 SAKTI ENTERPRISE 262.46 236.52 90.12 81
218 PURBA BARDHAMAN Burdwan-II Burdwan Division Gangua Piped Water Supply Scheme , SM/13295 New Supply of Inspection Vehicle for inspection of different JJM related (Schemes) works as and when required including supply of driver & fuel (minimum 8 Hours duty per day) and all taxes etc. for Burdwan Sub-Division under Burdwan Division, P.H.E. Dte. consider 96.00 Km. run per day.[Period from 01/08/2023 to 31/10/2023] ORD/000845/2023-2024 1759/BSD 28/07/2023 66 MD HASIN 0.85 0.00 0 0
219 PURBA BARDHAMAN Burdwan-II Burdwan Division Gangua Piped Water Supply Scheme , SM/13295 New Material Requisition To Resource Division RTOR000257/2023-2024 2197/BWD 12/05/2023 0 Resource Division 11.50 0.00 0 0
220 PURBA BARDHAMAN Burdwan-II Burdwan Division Gangua Piped Water Supply Scheme , SM/13295 New Material Requisition To Resource Division RTOR000514/2023-2024 4038/BWD 08/09/2023 0 Resource Division 0.41 0.00 0 0
221 PURBA BARDHAMAN Burdwan-II Burdwan Division Gangua Piped Water Supply Scheme , SM/13295 New Material Requisition To Resource Division RTOR000667/2023-2024 5088/BWD 23/11/2023 0 Resource Division 20.46 0.00 0 0
222 PURBA BARDHAMAN Burdwan-II Central Mechanical Gangua Piped Water Supply Scheme , SM/13295 New New service connection for Gangua PWSS TW 2 BILL/02414/2023-2024 BP-2023-24-512 08/02/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 8.61 0.00 0 0
223 PURBA BARDHAMAN Burdwan-II Central Mechanical Gangua Piped Water Supply Scheme , SM/13295 New New service connection for Gangua W/S scheme TW No-1 BILL/02274/2023-2024 BP-2023-24-409 19/01/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 8.34 0.00 0 0
224 PURBA BARDHAMAN Burdwan-II Burdwan Division Gangua Piped Water Supply Scheme , SM/13295 New GANGUA Piped Water Supply Scheme with Sinking of tube-well, LDS, Rising Main, FHTC, Construction of 150 cum capacity RCC OHR with 20.0 mtr. with Staging height including soil investigation & construction of switch-rooms & boundary walls at different TW site under Burdwan-II Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. Junior Engineer, Burdwan Sadar Sub-Division ORD/000525/2023-2024 3616/BWD 18/08/2023 592 SHIVAM UN-EMPLOYED ENGINEERS CO-OPERATIVE SOCIETY LTD. 340.75 161.59 47.42 95
225 PURBA BARDHAMAN Burdwan-II Central Mechanical Gangua Piped Water Supply Scheme , SM/13295 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at KUSHA & others water supply scheme under Bardhaman-II Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman ASSISTANT ENGINEER Junior Engineer ORD/000065/2024-2025 2389/CMD 02/08/2024 90 DILIP MAHATO 53.14 0.00 0 12
226 PURBA BARDHAMAN Kalna-I Burdwan Division SHIKARPUR PIPED WATER SUPPLY SCHEME , SM/14437 New Material Requisition To Resource Division RTOR000089/2022-2023 1249/BWD 17/03/2023 0 Resource Division 15.17 0.00 0 0
227 PURBA BARDHAMAN Kalna-I Burdwan Division SHIKARPUR PIPED WATER SUPPLY SCHEME , SM/14437 New Material Requisition To Resource Division RTOR000037/2023-2024 1962/BWD 25/04/2023 0 Resource Division 41.55 0.00 0 0
228 PURBA BARDHAMAN Kalna-I Central Mechanical SHIKARPUR PIPED WATER SUPPLY SCHEME , SM/14437 New Quotation for new electric service connection at Shikarpur PH NO.-2 BILL/01736/2023-2024 BP-2023-24-247 07/12/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 8.73 0.00 0 0
229 PURBA BARDHAMAN Kalna-I Central Mechanical SHIKARPUR PIPED WATER SUPPLY SCHEME , SM/14437 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Joykrishnapur & others water supply scheme under Purbasthali-2,jamalpur,kalna 1 Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000101/2024-2025 2398/CMD 02/08/2024 90 MS S G ENTERPRISE 53.43 0.00 0 0
230 PURBA BARDHAMAN Kalna-I Burdwan Division SHIKARPUR PIPED WATER SUPPLY SCHEME , SM/14437 New Work Order For "CONSTRUCTION OF TEMPORARY KIOSK FOR THE NECESSARY ARRANGEMENT OF ELECTRIFICATION OF TUBEWELL FOR NANDAI PWSS & SHIKARPUR PWSS UNDER KALNA SUB-DIVISION UNDER BURDWAN DIVISION, PHE DTE." Assistant Engineer Junior Engineer, R.W.S. Burdwan Sub Division, P.H.E. Dt ORD/001144/2023-2024 1980/KSD 09/02/2024 10 ER CONSTRUCTION & GENERAL ORDER SUPPLIER 0.66 0.33 50 100
231 PURBA BARDHAMAN Kalna-I Central Mechanical SHIKARPUR PIPED WATER SUPPLY SCHEME , SM/14437 New Electric quotation for New Service Connection at Shikarpur W/S Scehem PH-I. BILL/01774/2023-2024 BP-2023-24-287 26/12/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 6.57 0.00 0 0
232 PURBA BARDHAMAN Kalna-I Burdwan Division SHIKARPUR PIPED WATER SUPPLY SCHEME , SM/14437 New Different works related (sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of different capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site) to DEARA, PATHARDANGA & SHIKARPUR Piped Water Supply Scheme under KALNA-I Block, District:- Purba Bardhaman [NEW SCHEME] Assistant Engineer Junior Engineer, R.W.S. Burdwan Sub Division, P.H.E. Dt ORD/000734/2022-2023 1004/BWD 06/03/2023 365 M/S TAPAS KUMAR CHAKRABORTY 1,584.09 319.18 20.15 75
233 PURBA BARDHAMAN Kalna-I Burdwan Division SHIKARPUR PIPED WATER SUPPLY SCHEME , SM/14437 New Temporary approach road from Shikarpur Graveyard to OHr site and Shikarpur Bus stand to 2nd tube well site in order to carry building materials for Shikarpur Piped W/S. Scheme (SM/14437) within Kalna Sub-Division under Burdwan Division, PHE. Dte. Assistant Engineer Junior Engineer, R.W.S. Burdwan Sub Division, P.H.E. Dt ORD/001229/2024-2025 767/BWD 27/02/2025 15 M/S TAPAS KUMAR CHAKRABORTY 5.75 0.00 0 0
234 PURBA BARDHAMAN Kalna-I Burdwan Division SHIKARPUR PIPED WATER SUPPLY SCHEME , SM/14437 New Pipeline laying by HDD method and different types of balance works in connection with different Augmentation & New Scheme [(SM/ 08103), (SM/13413), (SM/15587), (SM/16035), (SM/16287), (SM/16029), (SM/15581), (SM/14437), (SM/16028), (SM/16036) & (SM/14425)] within Kalna Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer ORD/001270/2024-2025 849/BWD 05/03/2025 180 S.P. CONSTRUCTION 683.30 0.00 0 0
235 PURBA BARDHAMAN Kalna-I Burdwan Division SHIKARPUR PIPED WATER SUPPLY SCHEME , SM/14437 New Supply & Laying of 300mm Dia M.S.E.R.W Pipe including Jack Pushing along with other allied work in connection with different Augmentation & New [(SM/18439, SM/14437, SM/14435, SM/07805, SM/14440, SM/15571, SM/08030, SM/16014, SM/15588, SM/16298 & SM/16307)] under Kalna Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/001187/2024-2025 608/BWD 11/02/2025 361 MANASH GHOSH 1,209.62 0.00 0 51
236 PURBA BARDHAMAN Kalna-I Burdwan Division PATHARDANGA PIPED WATER SUPPLY SCHEME , SM/14440 New Work Order for Supply of 1 (one) No. Diesel driven Motor cab on hire basis for the Office of the Assistant Engineer, under Kalna Sub-Division within Burdwan Division, P.H.E. Dte. [Period from 01.07.2023 to 31.12.2023] ORD/000898/2023-2024 825/KSD 28/06/2023 184 PARTHA PRATIM ACHARYA 0.00 0.00 NAN 0
237 PURBA BARDHAMAN Kalna-I Burdwan Division PATHARDANGA PIPED WATER SUPPLY SCHEME , SM/14440 New Material Requisition To Resource Division RTOR000103/2022-2023 1636/BWD 06/04/2023 0 Resource Division 4.20 0.00 0 0
238 PURBA BARDHAMAN Kalna-I Burdwan Division PATHARDANGA PIPED WATER SUPPLY SCHEME , SM/14440 New Material Requisition To Resource Division RTOR000088/2022-2023 1242/BWD 17/03/2023 0 Resource Division 17.57 0.00 0 0
239 PURBA BARDHAMAN Kalna-I Burdwan Division PATHARDANGA PIPED WATER SUPPLY SCHEME , SM/14440 New Material Requisition To Resource Division RTOR000498/2023-2024 4022/BWD 08/09/2023 0 Resource Division 34.67 0.00 0 0
240 PURBA BARDHAMAN Kalna-I Central Mechanical PATHARDANGA PIPED WATER SUPPLY SCHEME , SM/14440 New New service connection charges for Pathardanga PWSS TW-2 BILL/01530/2023-2024 BP-2023-24-198 13/10/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 4.06 0.00 0 0
241 PURBA BARDHAMAN Kalna-I Central Mechanical PATHARDANGA PIPED WATER SUPPLY SCHEME , SM/14440 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at PATHARDANGA Water Supply Scheme [ Block- KALNA-1] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000690/2023-2024 4016/CMD 29/08/2023 30 M/S, S.S. ENTERPRISE. 29.61 11.65 39.34 60
242 PURBA BARDHAMAN Kalna-I Central Mechanical PATHARDANGA PIPED WATER SUPPLY SCHEME , SM/14440 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Joykrishnapur & others water supply scheme under Purbasthali-2,jamalpur,kalna 1 Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000101/2024-2025 2398/CMD 02/08/2024 90 MS S G ENTERPRISE 53.43 0.00 0 0
243 PURBA BARDHAMAN Kalna-I Burdwan Division PATHARDANGA PIPED WATER SUPPLY SCHEME , SM/14440 New Work Order for "CONSTRUCTION OF TEMPORARY KIOSK FOR THE NECESSARY ARRANGEMENT OF ELECTRIFICATION OF TUBEWELL UNDER PATHARDANGA PWSS AND TAIPARA PWSS UNDER KALNA SUB-DIVISION UNDER BURDWAN DIVISION, PHE DTE. (2 UNITS:- 1 NO FOR PATHARDANGA PWSS & 1 NO FOR TAIPARA PWSS)" Assistant Engineer Junior Engineer, R.W.S. Burdwan Sub Division, P.H.E. Dt ORD/001141/2023-2024 1977/KSD 09/02/2024 10 BISWAS ENTERPRISE 0.66 0.33 50 100
244 PURBA BARDHAMAN Kalna-I Central Mechanical PATHARDANGA PIPED WATER SUPPLY SCHEME , SM/14440 New New Service connection for Pathardanga W/S Scheme PH No.-1 BILL/01803/2023-2024 BP-2023-24-307 30/12/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 6.44 0.00 0 0
245 PURBA BARDHAMAN Kalna-I Burdwan Division PATHARDANGA PIPED WATER SUPPLY SCHEME , SM/14440 New Different works related (sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of different capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site) to DEARA, PATHARDANGA & SHIKARPUR Piped Water Supply Scheme under KALNA-I Block, District:- Purba Bardhaman [NEW SCHEME] Assistant Engineer Junior Engineer, R.W.S. Burdwan Sub Division, P.H.E. Dt ORD/000734/2022-2023 1004/BWD 06/03/2023 365 M/S TAPAS KUMAR CHAKRABORTY 1,584.09 483.06 30.49 75
246 PURBA BARDHAMAN Kalna-I Burdwan Division PATHARDANGA PIPED WATER SUPPLY SCHEME , SM/14440 New Work order for "Restoration of pipeline with other allied works at different places of Ghanashyampur mouja under Pathardanga Pwss due to construction of rcc cover drain & widening of rcc concrete road constructed by PRI body under Kalna-I panchayat samiti under Kalna Sub-Division under Burdwan Division, PHE Dte.". Assistant Engineer Junior Engineer, R.W.S. Burdwan Sub Division, P.H.E. Dt ORD/000861/2024-2025 1846/KSD 27/11/2024 15 M/S TAPAS KUMAR CHAKRABORTY 4.22 0.00 0 100
247 PURBA BARDHAMAN Kalna-I Burdwan Division PATHARDANGA PIPED WATER SUPPLY SCHEME , SM/14440 New Work order for " Restoration of pipeline with other allied works at different places of Pathardanga mouja under Pathardanga Pwss due to construction of rcc cover drain & widening of rcc concrete road constructed by PRI body under Kalna-I panchayat samiti under Kalna Sub-Division under Burdwan Division, PHE Dte.". Assistant Engineer Junior Engineer, R.W.S. Burdwan Sub Division, P.H.E. Dt ORD/000862/2024-2025 1847/KSD 27/11/2024 15 M/S TAPAS KUMAR CHAKRABORTY 4.14 0.00 0 100
248 PURBA BARDHAMAN Kalna-I Burdwan Division PATHARDANGA PIPED WATER SUPPLY SCHEME , SM/14440 New Work order for "Restoration of pipeline with other allied works at different places of Beshbati mouja of Pathardanga Pwss due to construction of rcc cover drain & widening of rcc concrete road constructed by PRI body under Kalna-I panchayat samiti under Kalna Sub-Division under Burdwan Division, PHE Dte.". Assistant Engineer Junior Engineer, R.W.S. Burdwan Sub Division, P.H.E. Dt ORD/000867/2024-2025 1852/KSD 27/11/2024 15 M/S TAPAS KUMAR CHAKRABORTY 3.58 0.00 0 100
249 PURBA BARDHAMAN Kalna-I Burdwan Division PATHARDANGA PIPED WATER SUPPLY SCHEME , SM/14440 New Work order for "Restoration of pipeline with other allied works at different places of Rampur mouja under Pathardanga Pwss due to construction of rcc cover drain & widening of rcc concrete road constructed by PRI body under Kalna-I panchayat samiti under Kalna Sub-Division under Burdwan Division, PHE Dte." Assistant Engineer Junior Engineer, R.W.S. Burdwan Sub Division, P.H.E. Dt ORD/000864/2024-2025 1849/KSD 27/11/2024 15 M/S TAPAS KUMAR CHAKRABORTY 3.66 0.00 0 100
250 PURBA BARDHAMAN Kalna-I Burdwan Division PATHARDANGA PIPED WATER SUPPLY SCHEME , SM/14440 New Supply & Laying of 300mm Dia M.S.E.R.W Pipe including Jack Pushing along with other allied work in connection with different Augmentation & New [(SM/18439, SM/14437, SM/14435, SM/07805, SM/14440, SM/15571, SM/08030, SM/16014, SM/15588, SM/16298 & SM/16307)] under Kalna Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/001187/2024-2025 608/BWD 11/02/2025 361 MANASH GHOSH 1,209.62 0.00 0 51
251 PURBA BARDHAMAN Mangolkote Burdwan Division PURBA GOPALPUR PIPED WATER SUPPLY SCHEME , SM/14448 New Material Requisition To Resource Division RTOR000109/2023-2024 1965/BWD 26/04/2023 0 Resource Division 35.89 0.00 0 0
252 PURBA BARDHAMAN Mangolkote Burdwan Division PURBA GOPALPUR PIPED WATER SUPPLY SCHEME , SM/14448 New Material Requisition To Resource Division RTOR000181/2023-2024 2155/BWD 10/05/2023 0 Resource Division 17.80 0.00 0 0
253 PURBA BARDHAMAN Mangolkote Burdwan Division PURBA GOPALPUR PIPED WATER SUPPLY SCHEME , SM/14448 New Material Requisition To Resource Division RTOR000729/2023-2024 5263/BWD 30/11/2023 0 Resource Division 20.78 0.00 0 0
254 PURBA BARDHAMAN Mangolkote Central Mechanical PURBA GOPALPUR PIPED WATER SUPPLY SCHEME , SM/14448 New New service connection charges for Purba Gopalpur PWSS TW-1 BILL/01416/2023-2024 BP-2023-24-144 31/08/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 4.20 0.00 0 0
255 PURBA BARDHAMAN Mangolkote Burdwan Division PURBA GOPALPUR PIPED WATER SUPPLY SCHEME , SM/14448 New PURBA GOPALPUR Piped Water Supply Scheme with sinking of Tube-well, LDS, Rising Main, FHTC, Construction of 300 cum capacity RCC OHR with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drain and internal pathway at different TW site under MANGLAKOTE Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer JUNIOR ENGINEER KATWA SUB-DIVISION PHE DTE ORD/000020/2023-2024 1751/BWD 13/04/2023 841 BRAHMA CONSTRUCTION COMPANY 429.79 119.45 27.79 30
256 PURBA BARDHAMAN Mangolkote Central Mechanical PURBA GOPALPUR PIPED WATER SUPPLY SCHEME , SM/14448 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Jabagram & others water supply scheme under Mangalkote Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. Driller In-Charge Junior Engineer ORD/000118/2024-2025 2590/CMD 27/08/2024 90 M/S SAJAHAN CHOWDHURY 62.06 0.00 0 0
257 PURBA BARDHAMAN Mangolkote Central Mechanical PURBA GOPALPUR PIPED WATER SUPPLY SCHEME , SM/14448 New New service connection charges for Purba Gopalpur PWSS TW-2 BILL/01769/2023-2024 BP-2023-24-274 21/12/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.51 0.00 0 0
258 PURBA BARDHAMAN Mangolkote Burdwan Division PURBA GOPALPUR PIPED WATER SUPPLY SCHEME , SM/14448 New Constn. of pump house, Plinth Protection for Pump House & OHR, extension of pipeline for providing FHTC at MURULIA village, Adivasi para, approach road for 2nd Pump house of PURBA GOPALPUR PWSS Under Katwa Sub Division, Block- Mongolkote, Burdwan Division PHE Dte. Assistant Engineer JUNIOR ENGINEER KATWA SUB-DIVISION PHE DTE ORD/001124/2024-2025 496/BWD 28/01/2025 90 MONDAL ENTERPRISE 26.97 0.00 0 0
259 PURBA BARDHAMAN Burdwan-I Burdwan Division KURMUN PIPED WATER SUPPLY SCHEME , SM/13943 New Material Requisition To Resource Division RTOR000102/2023-2024 1962/BWD 25/04/2023 0 Resource Division 9.02 0.00 0 0
260 PURBA BARDHAMAN Burdwan-I Burdwan Division KURMUN PIPED WATER SUPPLY SCHEME , SM/13943 New Material Requisition To Resource Division RTOR000391/2023-2024 2197/BWD 12/05/2023 0 Resource Division 9.67 0.00 0 0
261 PURBA BARDHAMAN Burdwan-I Burdwan Division KURMUN PIPED WATER SUPPLY SCHEME , SM/13943 New Material Requisition To Resource Division RTOR000725/2023-2024 5271/BWD 30/11/2023 0 Resource Division 21.07 0.00 0 0
262 PURBA BARDHAMAN Burdwan-I Central Mechanical KURMUN PIPED WATER SUPPLY SCHEME , SM/13943 New New service connection charges for Kurmun PWSS TW-1 BILL/01675/2023-2024 BP-2023-24-226 10/11/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 5.00 0.00 0 0
263 PURBA BARDHAMAN Burdwan-I Central Mechanical KURMUN PIPED WATER SUPPLY SCHEME , SM/13943 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at MALKITA & others water supply scheme under Bardhaman-I Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman ASSISTANT ENGINEER Junior Engineer ORD/000066/2024-2025 2388/CMD 02/08/2024 90 ELECTRICAL & MECHANICAL ENGINEERING CORPORATION 55.95 0.00 0 0
264 PURBA BARDHAMAN Burdwan-I Burdwan Division KURMUN PIPED WATER SUPPLY SCHEME , SM/13943 New Supply of inspection Vehicle for inspection of different JJM related(schemes)works as and when required including supply of driver & fuel(minimum 8 hours duty per day) and all taxes etc. for Burdwan Sub-Division under Burdwan Division,PHE Dte consider 96.00 Km. run per day (Period from 01-02-2024 to 30-04-2024) Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/001181/2023-2024 188/BSD 31/01/2024 66 PARVIN BEGAM 0.85 0.28 32.94 97
265 PURBA BARDHAMAN Burdwan-I Burdwan Division KURMUN PIPED WATER SUPPLY SCHEME , SM/13943 New Supply, delivery, installation & hand hold demonstration of different equipments / machineries to test HDPE pipes as per IS: 4984-2016 at the pipe testing laboratory at Nababhat under Burdwan Division, PHE. Dte._2ND CALL AE(HQs) J.E. 1 BURDWAN ORD/001212/2023-2024 907/BWD 04/03/2024 30 MANASH GHOSH 23.87 4.93 20.65 100
266 PURBA BARDHAMAN Burdwan-I Central Mechanical KURMUN PIPED WATER SUPPLY SCHEME , SM/13943 New New service connection for Kurmun PWSS BILL/02857/2023-2024 BP-2023-24-603 06/03/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.63 0.00 0 0
267 PURBA BARDHAMAN Burdwan-I Burdwan Division KURMUN PIPED WATER SUPPLY SCHEME , SM/13943 New KURMUN Piped Water Supply Scheme with sinking of Tube-well, LDS, Rising Main, FHTC, Construction of 350 cum capacity RCC OHR with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drain and internal pathway at different TW site under Burdwan-I Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000659/2023-2024 4124/BWD 14/09/2023 818 GHOSH CONCERN 550.63 131.72 23.92 65
268 PURBA BARDHAMAN Burdwan-I Central Mechanical KURMUN PIPED WATER SUPPLY SCHEME , SM/13943 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at Kurmun Water Supply Scheme [ Block- Burdwan-1 ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER Junior Engineer ORD/000658/2023-2024 4001/CMD 29/08/2023 30 S.P. CONSTRUCTION 28.96 22.95 79.25 100
269 PURBA BARDHAMAN Burdwan-I Burdwan Division KURMUN PIPED WATER SUPPLY SCHEME , SM/13943 New Balance work [ i.e. Extension or parallel Pipeline, Leftout FHTC, Road Restoration work, Sinking of Additional Tube Well with Pump House & Boundary wall, inter Connection of Additional Tube Well, with allied work of KURMUN Piped Water Supply Scheme, Block-Burdwan- I under Burdwan Sub Division, PHE Dte. within Burdwan Division PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/001220/2024-2025 727/BWD 24/02/2025 120 SHIVAM UN-EMPLOYED ENGINEERS CO-OPERATIVE SOCIETY LTD. 95.65 0.00 0 0
270 PURBA BARDHAMAN Burdwan-I Burdwan Division BAKALSA PIPED WATER SUPPLY SCHEME , SM/13944 New Material Requisition To Resource Division RTOR000090/2023-2024 1962/BWD 25/04/2023 0 Resource Division 3.25 0.00 0 0
271 PURBA BARDHAMAN Burdwan-I Burdwan Division BAKALSA PIPED WATER SUPPLY SCHEME , SM/13944 New Material Requisition To Resource Division RTOR000222/2023-2024 2155/BWD 10/05/2023 0 Resource Division 21.15 0.00 0 0
272 PURBA BARDHAMAN Burdwan-I Burdwan Division BAKALSA PIPED WATER SUPPLY SCHEME , SM/13944 New Material Requisition To Resource Division RTOR000708/2023-2024 5041/BWD 23/11/2023 0 Resource Division 20.46 0.00 0 0
273 PURBA BARDHAMAN Burdwan-I Burdwan Division BAKALSA PIPED WATER SUPPLY SCHEME , SM/13944 New Material Requisition To Resource Division RTOR000575/2023-2024 4893/BWD 10/11/2023 0 Resource Division 6.50 0.00 0 0
274 PURBA BARDHAMAN Burdwan-I Central Mechanical BAKALSA PIPED WATER SUPPLY SCHEME , SM/13944 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Rajur & others water supply scheme under Ketugram-I Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. Driller In-Charge Junior Engineer ORD/000098/2024-2025 2407/CMD 02/08/2024 90 M.S. ENTERPRISE 82.29 0.00 0 0
275 PURBA BARDHAMAN Burdwan-I Central Mechanical BAKALSA PIPED WATER SUPPLY SCHEME , SM/13944 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at MALKITA & others water supply scheme under Bardhaman-I Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman ASSISTANT ENGINEER Junior Engineer ORD/000066/2024-2025 2388/CMD 02/08/2024 90 ELECTRICAL & MECHANICAL ENGINEERING CORPORATION 55.95 0.00 0 0
276 PURBA BARDHAMAN Burdwan-I Burdwan Division BAKALSA PIPED WATER SUPPLY SCHEME , SM/13944 New Supply, delivery, installation & hand hold demonstration of different equipments / machineries to test HDPE pipes as per IS: 4984-2016 at the pipe testing laboratory at Nababhat under Burdwan Division, PHE. Dte._2ND CALL AE(HQs) J.E. 1 BURDWAN ORD/001212/2023-2024 907/BWD 04/03/2024 30 MANASH GHOSH 23.87 4.99 20.9 100
277 PURBA BARDHAMAN Burdwan-I Central Mechanical BAKALSA PIPED WATER SUPPLY SCHEME , SM/13944 New New service connection charges for Bakalsa PWSS TW-1 BILL/01828/2023-2024 BP-2023-24-336 06/01/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 4.04 0.00 0 0
278 PURBA BARDHAMAN Burdwan-I Central Mechanical BAKALSA PIPED WATER SUPPLY SCHEME , SM/13944 New New service connection for Bakalsa PWSS. BILL/02248/2023-2024 BP-2023-24-395 17/01/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.99 0.00 0 0
279 PURBA BARDHAMAN Burdwan-I Burdwan Division BAKALSA PIPED WATER SUPPLY SCHEME , SM/13944 New Sinking of Tube-wells, LDS, Rising Main, FHTC, Construction of 300 cum capacity RCC OHR with 20.0 mtr. with Staging height including soil investigation, construction of switch room, boundary walls with gates, land development, surface drains and internal pathways at different TW site for BAKALSA Piped Water Supply Scheme under BURDWAN-I Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JE (RWS) Burdwan-I Block ORD/000573/2023-2024 3723/BWD 25/08/2023 727 M/S GHOSH & CO. 534.23 166.72 31.21 25
280 PURBA BARDHAMAN Memari-II Burdwan Division NANDIARA PIPED WATER SUPPLY SCHEME , SM/14019 New Material Requisition To Resource Division RTOR000351/2023-2024 2197/BWD 12/05/2023 0 Resource Division 13.72 0.00 0 0
281 PURBA BARDHAMAN Memari-II Burdwan Division NANDIARA PIPED WATER SUPPLY SCHEME , SM/14019 New Material Requisition To Resource Division RTOR000428/2023-2024 3836/BWD 01/09/2023 0 Resource Division 2.35 0.00 0 0
282 PURBA BARDHAMAN Memari-II Burdwan Division NANDIARA PIPED WATER SUPPLY SCHEME , SM/14019 New Material Requisition To Resource Division RTOR000680/2023-2024 5064/BWD 23/11/2023 0 Resource Division 20.46 0.00 0 0
283 PURBA BARDHAMAN Memari-II Burdwan Division NANDIARA PIPED WATER SUPPLY SCHEME , SM/14019 New NANDIARA Piped Water Supply Scheme with sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of 200 cum capacity RCC OHRs with 20.0 mtr. Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site under Memari-II Block, District:- Purba Bardhaman [NEW SCHEME] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER RWS BURDWAN SUB-DIVISION PHE DTE ORD/000487/2023-2024 3502/BWD 10/08/2023 690 S.S.S. ENTERPRISES 451.06 180.28 39.97 45
284 PURBA BARDHAMAN Memari-II Central Mechanical NANDIARA PIPED WATER SUPPLY SCHEME , SM/14019 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at NOAHATI & others water supply scheme under Memari-II Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. ASSISTANT ENGINEER Junior Engineer ORD/000102/2024-2025 2395/CMD 02/08/2024 90 S.G. TECHNICAL SERVICES 36.99 0.00 0 0
285 PURBA BARDHAMAN Memari-II Burdwan Division NANDIARA PIPED WATER SUPPLY SCHEME , SM/14019 New Supply of inspection Vehicle for inspection of different JJM related(schemes)works as and when required including supply of driver & fuel(minimum 8 hours duty per day) and all taxes etc. for Burdwan Sub-Division under Burdwan Division,PHE Dte consider 96.00 Km. run per day (Period from 01-02-2024 to 30-04-2024) Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/001181/2023-2024 188/BSD 31/01/2024 66 PARVIN BEGAM 0.85 0.28 32.94 97
286 PURBA BARDHAMAN Memari-II Central Mechanical NANDIARA PIPED WATER SUPPLY SCHEME , SM/14019 New New service connection for NANDIARA PWSS TW 2. BILL/02443/2023-2024 BP-2023-24-520 09/02/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 4.33 0.00 0 0
287 PURBA BARDHAMAN Memari-II Central Mechanical NANDIARA PIPED WATER SUPPLY SCHEME , SM/14019 New New service connection for NANDIARA PWSS TW 1. BILL/02442/2023-2024 BP-2023-24-521 09/02/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 6.76 0.00 0 0
288 PURBA BARDHAMAN Memari-II Central Mechanical NANDIARA PIPED WATER SUPPLY SCHEME , SM/14019 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at Nandiara Water Supply Scheme [ Block- Memari-2 ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER Junior Engineer ORD/000715/2023-2024 4026/CMD 29/08/2023 642 JAGANNATH ENTERPRISE 29.39 0.00 0 50
289 PURBA BARDHAMAN Memari-II Burdwan Division NANDIARA PIPED WATER SUPPLY SCHEME , SM/14019 New Continuation work order for "Supply of one No. Diesel Driven Ambassador Car on hire basis for the office of the Assistant Engineer, Burdwan Sub-Division, PHE Dte. (Period from 01-12-2024 to 28-02-2025 JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/001043/2024-2025 2636/BSD 29/11/2024 90 SK. ASFIA 1.20 0.78 65 60
290 PURBA BARDHAMAN Burdwan-II Burdwan Division GROUND WATER BASED KANDARSONA PWSS , SM/13339 New Material Requisition To Resource Division RTOR000068/2022-2023 1256/BWD 17/03/2023 0 Resource Division 6.23 0.00 0 0
291 PURBA BARDHAMAN Burdwan-II Burdwan Division GROUND WATER BASED KANDARSONA PWSS , SM/13339 New Material Requisition To Resource Division RTOR000113/2022-2023 1962/BWD 25/04/2023 0 Resource Division 3.30 0.00 0 0
292 PURBA BARDHAMAN Burdwan-II Burdwan Division GROUND WATER BASED KANDARSONA PWSS , SM/13339 New Material Requisition To Resource Division RTOR000721/2023-2024 5262/BWD 30/11/2023 0 Resource Division 21.07 0.00 0 0
293 PURBA BARDHAMAN Burdwan-II Central Mechanical GROUND WATER BASED KANDARSONA PWSS , SM/13339 New New Service Connection charges for Kandarsona W/S Scheme TW-2 BILL/00605/2023-2024 BP-2023-24-12 17/05/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 4.40 0.00 0 0
294 PURBA BARDHAMAN Burdwan-II Central Mechanical GROUND WATER BASED KANDARSONA PWSS , SM/13339 New New Service Connection charges for Kandarsona W/S Scheme TW-1 BILL/00604/2023-2024 BP-2023-24-11 17/05/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.35 0.00 0 0
295 PURBA BARDHAMAN Burdwan-II Central Mechanical GROUND WATER BASED KANDARSONA PWSS , SM/13339 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at Kandarsona Water Supply Scheme [Block- Burdwan-2] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER Junior Engineer ORD/000033/2023-2024 2471/CMD 30/05/2023 30 DUTTA ENTERPRISE 28.92 23.54 81.4 80
296 PURBA BARDHAMAN Burdwan-II Central Mechanical GROUND WATER BASED KANDARSONA PWSS , SM/13339 New Supply & delivery of standby Submersible pumping machinery for Kandarsona & others water supply scheme, under CMD, P.H.E. Dte., Dist.- Purba Bardhaman ASSISTANT ENGINEER Junior Engineer ORD/001638/2023-2024 823/CMSD 05/10/2023 21 DUTTA ENTERPRISE 0.84 0.84 100 98
297 PURBA BARDHAMAN Burdwan-II Central Mechanical GROUND WATER BASED KANDARSONA PWSS , SM/13339 New Re-orientation of delivery pipe line by supply & fitting fixing different CIDF materials, pressure gauge etc. at Kandarsona water supply scheme, T.W. No.- I & II under CMD, P.H.E. Dte., Dist.- Purba Bardhaman. ASSISTANT ENGINEER Junior Engineer ORD/001707/2023-2024 843/CMSD 18/10/2023 10 DUTTA ENTERPRISE 0.79 0.79 100 99
298 PURBA BARDHAMAN Burdwan-II Central Mechanical GROUND WATER BASED KANDARSONA PWSS , SM/13339 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at KUSHA & others water supply scheme under Bardhaman-II Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman ASSISTANT ENGINEER Junior Engineer ORD/000065/2024-2025 2389/CMD 02/08/2024 90 DILIP MAHATO 53.14 0.00 0 12
299 PURBA BARDHAMAN Burdwan-II Central Mechanical GROUND WATER BASED KANDARSONA PWSS , SM/13339 New Supply and installation of Electro-Magnetic flow meter at HARIGRAM, KUCHUT & others water supply scheme under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. ASSISTANT ENGINEER Junior Engineer ORD/000564/2024-2025 3103/CMD 11/12/2024 60 S DUTTA 15.06 0.00 0 0
300 PURBA BARDHAMAN Burdwan-II Burdwan Division GROUND WATER BASED KANDARSONA PWSS , SM/13339 New KANDARSONA Piped Water Supply Scheme with Sinking of tube-well, LDS, Rising Main, FHTC, Construction of 150 cum capacity RCC OHR with 20.0 mtr. with Staging height including soil investigation & construction of switch-rooms & boundary walls at different TW site under Burdwan-II Block, District:- Purba-Bardhaman. [NEW SCHEME] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. Junior Engineer, Burdwan Sadar Sub-Division ORD/000655/2022-2023 358/BWD 30/01/2023 701 M/S S.S. ENTERPRISE 284.66 240.27 84.41 90
301 PURBA BARDHAMAN Raina-I Burdwan Division GOPALPUR PIPED WATER SUPPLY SCHEME , SM/15235 New Material Requisition To Resource Division RTOR000482/2023-2024 4006/BWD 08/09/2023 0 Resource Division 5.14 0.00 0 0
302 PURBA BARDHAMAN Raina-I Burdwan Division GOPALPUR PIPED WATER SUPPLY SCHEME , SM/15235 New Material Requisition To Resource Division RTOR000197/2023-2024 2155/BWD 10/05/2023 0 Resource Division 12.69 0.00 0 0
303 PURBA BARDHAMAN Raina-I Burdwan Division GOPALPUR PIPED WATER SUPPLY SCHEME , SM/15235 New Material Requisition To Resource Division RTOR000669/2023-2024 5083/BWD 23/11/2023 0 Resource Division 20.46 0.00 0 0
304 PURBA BARDHAMAN Raina-I Central Mechanical GOPALPUR PIPED WATER SUPPLY SCHEME , SM/15235 New New service connection charges for Gopalpur PWSS TW-2 BILL/01528/2023-2024 BP-2023-24-193 11/10/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.82 0.00 0 0
305 PURBA BARDHAMAN Raina-I Burdwan Division GOPALPUR PIPED WATER SUPPLY SCHEME , SM/15235 New Restoration of hard shoulder from 0.00 km to 2.918 km of Sagrai Raina Road (MDR) for laying of water supply pipeline of Gopalpur PWSS under Burdwan Division, PHE Dte. BILL/01127/2023-2024 1084/JJM 20/12/2023 0 EXECUTIVE ENGINEER BURDWAN SOUTH HIGHWAY DIVISION P.W. (ROADS) DTE. 4.72 0.00 0 0
306 PURBA BARDHAMAN Raina-I Burdwan Division GOPALPUR PIPED WATER SUPPLY SCHEME , SM/15235 New Field level data validation of FHTC executed by Agencies on the basis of pictorial data with the objective of controlling multiple entry,improving data quality in terms of absolute household by verification through electric connection or any other unique documents and making error free database of GOPALPUR Pipe Water Supply Scheme in Raina-I Block within Burdwan Sub-Division under Burdwan Division,PHE Dte JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000946/2024-2025 2732/BSD 10/12/2024 30 TECHVISION 0.56 0.00 0 0
307 PURBA BARDHAMAN Raina-I Central Mechanical GOPALPUR PIPED WATER SUPPLY SCHEME , SM/15235 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at Gopalpur Water Supply Scheme [ Block- Raina-1 ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000720/2023-2024 4031/CMD 29/08/2023 30 M/S. SWAPAN BANERJEE 28.98 23.86 82.33 100
308 PURBA BARDHAMAN Raina-I Central Mechanical GOPALPUR PIPED WATER SUPPLY SCHEME , SM/15235 New New electric connection for Gopalpur PWSS. BILL/01869/2023-2024 BP-2023-24-344 11/01/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.66 0.00 0 0
309 PURBA BARDHAMAN Raina-I Central Mechanical GOPALPUR PIPED WATER SUPPLY SCHEME , SM/15235 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Bajitpur, Belsar & other water supply scheme under Raina-1 Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000117/2024-2025 2589/CMD 27/08/2024 90 DEY ENTERPRISE 74.58 0.00 0 10
310 PURBA BARDHAMAN Raina-I Burdwan Division GOPALPUR PIPED WATER SUPPLY SCHEME , SM/15235 New Balance work [i.e. Extension or parallel Pipeline, Leftout FHTC, Road Restoration work, Sinking of Additional Tube Well with Pump House & Boundary wall, inter Connection of Additional Tube Well, Construction of M.S.Structural bridge, canal Crossing, MS casing with allied work of Bhagabatipur, Machkhara, Udgara, Bantir, Chakpurohit Rasuikhanda, Sankarpur, Gopalpur & Belshar PWSS Block-RAINA- I under Burdwan Sub Division, PHE Dte. within Burdwan Division PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/001103/2024-2025 469/BWD 24/01/2025 366 SK ALIM 1,353.91 0.00 0 25
311 PURBA BARDHAMAN Bhatar Burdwan Division MAHATA PIPED WATER SUPPLY SCHEME , SM/15242 New Material Requisition To Resource Division RTOR000068/2023-2024 1962/BWD 25/04/2023 0 Resource Division 45.74 0.00 0 0
312 PURBA BARDHAMAN Bhatar Burdwan Division MAHATA PIPED WATER SUPPLY SCHEME , SM/15242 New Material Requisition To Resource Division RTOR000169/2023-2024 2155/BWD 10/05/2023 0 Resource Division 5.19 0.00 0 0
313 PURBA BARDHAMAN Bhatar Burdwan Division MAHATA PIPED WATER SUPPLY SCHEME , SM/15242 New Material Requisition To Resource Division RTOR000578/2023-2024 4926/BWD 10/11/2023 0 Resource Division 37.58 0.00 0 0
314 PURBA BARDHAMAN Bhatar Central Mechanical MAHATA PIPED WATER SUPPLY SCHEME , SM/15242 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at MAHATA Water Supply Scheme [ Block- BHATAR] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000822/2023-2024 4099/CMD 29/08/2023 30 BENGAL CONSTRUCTION. 27.79 21.39 76.97 90
315 PURBA BARDHAMAN Bhatar Central Mechanical MAHATA PIPED WATER SUPPLY SCHEME , SM/15242 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Karjana & others water supply scheme under Bhatar Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000067/2024-2025 2394/CMD 02/08/2024 90 AHALYA ENGINEERING WORKS 82.00 0.00 0 0
316 PURBA BARDHAMAN Bhatar Central Mechanical MAHATA PIPED WATER SUPPLY SCHEME , SM/15242 New New service connection charges for Mahata PWSS TW-1 BILL/01830/2023-2024 BP-2023-24-338 06/01/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 10.54 0.00 0 0
317 PURBA BARDHAMAN Bhatar Central Mechanical MAHATA PIPED WATER SUPPLY SCHEME , SM/15242 New New Service connection at Mahata PWSS PH-1 BILL/02318/2023-2024 BP-2023-24-538 15/02/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 7.24 0.00 0 0
318 PURBA BARDHAMAN Bhatar Central Mechanical MAHATA PIPED WATER SUPPLY SCHEME , SM/15242 New ADDITIONAL CONNECTION FOR MAHATA PWSS PH-1. BILL/02875/2023-2024 BP-2023-24-599 06/03/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 8.10 0.00 0 0
319 PURBA BARDHAMAN Bhatar Burdwan Division MAHATA PIPED WATER SUPPLY SCHEME , SM/15242 New Different works related (sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of different capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site) to DHENRIA, MAHATA, DEBPUR Piped Water Supply Scheme under BHATAR Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer ,Junior Engineer2, Durgapur Sub-Division, PHE Dte. ORD/000019/2023-2024 1737/BWD 13/04/2023 993 M/S B. RAI CONSTRUCTION COMPANY 1,643.39 289.77 17.63 81
320 PURBA BARDHAMAN Bhatar Burdwan Division MAHATA PIPED WATER SUPPLY SCHEME , SM/15242 New Continuation for the work of Supply of Inspection Vehicle for inspection of different JJM related (Schemes) works as and when required including supply of driver & fuel (minimum 8 Hours duty per day) and all taxes etc. for Durgapur Sub-Division under BurdwanDivision, P.H.E. Dte.consider 96.00 Km. run per day [Period AUG.'2024 to OCT.'2024] ORD/000845/2024-2025 575/DSD 19/07/2024 78 MD HASIN 1.00 0.33 33 0
321 PURBA BARDHAMAN Bhatar Burdwan Division MAHATA PIPED WATER SUPPLY SCHEME , SM/15242 New FOR FIXING OF DISPLAY BOARD WITH M.S STRUCTURE CONTAINING SCHEME DESCRIPTION AT KHEJURHATI PWSS AND OTHER SCHEMES ( 16 Nos) WITHIN BHATAR BLOCK UNDER BURDWAN DIVISION , PHE Dte. ORD/001422/2024-2025 298/DSD 20/02/2025 21 SHUBHRA KANTI GHOSH 1.39 0.00 0 0
322 PURBA BARDHAMAN Khandaghosh Burdwan Division AMILIA PIPED WATER SUPPLY SCHEME , SM/14963 New Material Requisition To Resource Division RTOR000102/2022-2023 1637/BWD 06/04/2023 0 Resource Division 1.93 0.00 0 0
323 PURBA BARDHAMAN Khandaghosh Burdwan Division AMILIA PIPED WATER SUPPLY SCHEME , SM/14963 New Material Requisition To Resource Division RTOR000084/2022-2023 1239/BWD 17/03/2023 0 Resource Division 5.51 0.00 0 0
324 PURBA BARDHAMAN Khandaghosh Central Mechanical AMILIA PIPED WATER SUPPLY SCHEME , SM/14963 New New service connection charges of Amilia W/S Scheme TW-2 BILL/00679/2023-2024 BP-2023-24-24 21/06/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 2.81 0.00 0 0
325 PURBA BARDHAMAN Khandaghosh Central Mechanical AMILIA PIPED WATER SUPPLY SCHEME , SM/14963 New New service connection charges of Amilia W/S Scheme TW-1 BILL/00678/2023-2024 BP-2023-24-23 21/06/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.90 0.00 0 0
326 PURBA BARDHAMAN Khandaghosh Burdwan Division AMILIA PIPED WATER SUPPLY SCHEME , SM/14963 New AMILIA Piped Water Supply Scheme with sinking of Tube-well, LDS, Construction of 150 cum RCC OHR with 20 mtr. staging height including soil testing, Rising Main, FHTC & construction of switch rooms & boundary walls with gates and land development, drain and internal pathway at different TW site under Khandaghosh Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer1, Durgapur Sub-Division, PHE Dte.,Junior Engineer2, Durgapur Sub-Division, PHE Dte. ORD/000737/2022-2023 1067/BWD 13/03/2023 300 SHUBHRA KANTI GHOSH 247.76 225.51 91.02 40
327 PURBA BARDHAMAN Khandaghosh Central Mechanical AMILIA PIPED WATER SUPPLY SCHEME , SM/14963 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at Amilia Water Supply Scheme [ Block- Khandoghosh ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER Junior Engineer ORD/000051/2023-2024 2515/CMD 02/06/2023 30 MS MANABESH ROY 28.91 23.60 81.63 90
328 PURBA BARDHAMAN Khandaghosh Burdwan Division AMILIA PIPED WATER SUPPLY SCHEME , SM/14963 New Material Requisition To Resource Division RTOR000789/2023-2024 319/BWD 24/01/2024 0 Resource Division 21.17 0.00 0 0
329 PURBA BARDHAMAN Khandaghosh Burdwan Division AMILIA PIPED WATER SUPPLY SCHEME , SM/14963 New Way leave / Track crossing proposal with Application ID: SER-ADRA-2024-WL-114 in IR-RBCS laying of 200 mm dia Carrier pipe with 600 mm dia Casing pipe for water supply on (Jal Jeevan Mission) at KM 317/03 to 317/04 in between Seharabazar (SRBZ) to Kaiyar (KYB) by PHE Dte.,Burdwan Division. BILL/01098/2024-2025 1184/JJM 20/12/2024 0 INDIAN RAILWAY 5.32 0.00 0 0
330 PURBA BARDHAMAN Khandaghosh Burdwan Division AMILIA PIPED WATER SUPPLY SCHEME , SM/14963 New Continuation for the work of Supply of Inspection Vehicle for inspection of different JJM related (Schemes) works as and when required including supply of driver & fuel (minimum 8 Hours duty per day) and all taxes etc. for Durgapur Sub-Division under BurdwanDivision, P.H.E. Dte.consider 96.00 Km. run per day [Period AUG.'2024 to OCT.'2024] ORD/000845/2024-2025 575/DSD 19/07/2024 78 MD HASIN 1.00 0.33 33 0
331 PURBA BARDHAMAN Khandaghosh Central Mechanical AMILIA PIPED WATER SUPPLY SCHEME , SM/14963 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at KHEJURHATI & others water supply scheme under Khandoghosh Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman ASSISTANT ENGINEER Junior Engineer ORD/000071/2024-2025 2391/CMD 02/08/2024 90 C.M. ENTERPRISE 45.81 0.00 0 10
332 PURBA BARDHAMAN Khandaghosh Burdwan Division AMILIA PIPED WATER SUPPLY SCHEME , SM/14963 New Survey, planning, design of pipe crossing system by adopting trenchless technologies (e.g. Jack Pushing Method etc.) for crossing Railway, as per relevant I.S. Code with latest amendment, guidelines, specification and requirement of the authorities owning the railway track, submission of design report and drawing obtaining permission on behalf of the PHE Dte. across the railway track between Seharabazar (SRBZ) and Kaiyar (KYB) Station & connecting with existing 160mm dia HDPE distribution main line of AMILIA Water Supply Scheme of Khandaghosh Block under Burdwan Division, P.H.E. Dte. Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/001308/2024-2025 938/BWD 11/03/2025 30 MANASH GHOSH 30.33 0.00 0 0
333 PURBA BARDHAMAN Mangolkote Burdwan Division PASCHIM NABAGRAM PIPED WATER SUPPLY SCHEME , SM/14964 New Material Requisition To Resource Division RTOR000366/2023-2024 2197/BWD 12/05/2023 0 Resource Division 16.26 0.00 0 0
334 PURBA BARDHAMAN Mangolkote Burdwan Division PASCHIM NABAGRAM PIPED WATER SUPPLY SCHEME , SM/14964 New Material Requisition To Resource Division RTOR000686/2023-2024 5079/BWD 23/11/2023 0 Resource Division 19.78 0.00 0 0
335 PURBA BARDHAMAN Mangolkote Burdwan Division PASCHIM NABAGRAM PIPED WATER SUPPLY SCHEME , SM/14964 New Material Requisition To Resource Division RTOR000499/2023-2024 4023/BWD 08/09/2023 0 Resource Division 5.83 0.00 0 0
336 PURBA BARDHAMAN Mangolkote Central Mechanical PASCHIM NABAGRAM PIPED WATER SUPPLY SCHEME , SM/14964 New NEW SERVICE CONNECTION FOR PASCHIM NABAGRAM PWSS PH-2 BILL/00189/2024-2025 BP-2024-25-86 15/05/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 6.13 0.00 0 0
337 PURBA BARDHAMAN Mangolkote Central Mechanical PASCHIM NABAGRAM PIPED WATER SUPPLY SCHEME , SM/14964 New NEW SERVICE CONNECTION FOR PASCHIM NABAGRAM PWSS PH-1 BILL/00190/2024-2025 BP-2024-25-85 15/05/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 5.06 0.00 0 0
338 PURBA BARDHAMAN Mangolkote Central Mechanical PASCHIM NABAGRAM PIPED WATER SUPPLY SCHEME , SM/14964 New Additional Quotation for service connection at Paschim Nabagram PWSS PH-2. BILL/00419/2024-2025 BP-2024-25-220 26/07/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 12.00 0.00 0 0
339 PURBA BARDHAMAN Mangolkote Burdwan Division PASCHIM NABAGRAM PIPED WATER SUPPLY SCHEME , SM/14964 New PASCHIM NABAGRAM Piped Water Supply Scheme with sinking of Tube-well, LDS, Rising Main, FHTC, Construction of 250 cum capacity RCC OHR with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drain and internal pathway at different TW site under Mongalkote Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer Junior Engineer ,JUNIOR ENGINEER KATWA SUB-DIVISION PHE DTE ORD/000177/2023-2024 3069/BWD 18/07/2023 683 SRI RAM CONSTRUCTION 473.94 280.96 59.28 25
340 PURBA BARDHAMAN Mangolkote Central Mechanical PASCHIM NABAGRAM PIPED WATER SUPPLY SCHEME , SM/14964 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Lakshimpur & others water supply scheme under Mangalkote Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman Driller In-Charge Junior Engineer ORD/000097/2024-2025 2406/CMD 02/08/2024 290 CHOUDHURY ENTERPRISE 57.65 0.00 0 10
341 PURBA BARDHAMAN Burdwan-I Burdwan Division BAHIR SARBAMANGALA-A PIPE WATER SUPPLY SCHEME , SM/14976 New Material Requisition To Resource Division RTOR000203/2023-2024 2155/BWD 10/05/2023 0 Resource Division 11.50 0.00 0 0
342 PURBA BARDHAMAN Burdwan-I Burdwan Division BAHIR SARBAMANGALA-A PIPE WATER SUPPLY SCHEME , SM/14976 New Material Requisition To Resource Division RTOR000507/2023-2024 4031/BWD 08/09/2023 0 Resource Division 3.08 0.00 0 0
343 PURBA BARDHAMAN Burdwan-I Burdwan Division BAHIR SARBAMANGALA-A PIPE WATER SUPPLY SCHEME , SM/14976 New Material Requisition To Resource Division RTOR000645/2023-2024 5094/BWD 23/11/2023 0 Resource Division 20.46 0.00 0 0
344 PURBA BARDHAMAN Burdwan-I Burdwan Division BAHIR SARBAMANGALA-A PIPE WATER SUPPLY SCHEME , SM/14976 New BAHIRSARBAMANGALA-A Piped Water Supply Scheme with sinking of Tube-well, LDS, Rising Main, FHTC, Construction of 300 cum capacity RCC OHR with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drain and internal pathway at different TW site under Burdwan-I Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000106/2023-2024 2297/BWD 19/05/2023 365 MLG CONSTRUCTION 371.05 0.00 0 30
345 PURBA BARDHAMAN Burdwan-I Central Mechanical BAHIR SARBAMANGALA-A PIPE WATER SUPPLY SCHEME , SM/14976 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at MALKITA & others water supply scheme under Bardhaman-I Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman ASSISTANT ENGINEER Junior Engineer ORD/000066/2024-2025 2388/CMD 02/08/2024 90 ELECTRICAL & MECHANICAL ENGINEERING CORPORATION 55.95 0.00 0 0
346 PURBA BARDHAMAN Burdwan-I Central Mechanical BAHIR SARBAMANGALA-A PIPE WATER SUPPLY SCHEME , SM/14976 New New Service connection for Bahir Sarbamangala (Part-A) PWSS TW-1. BILL/02895/2023-2024 BP-2023-24-624 07/03/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 7.85 0.00 0 0
347 PURBA BARDHAMAN Burdwan-I Central Mechanical BAHIR SARBAMANGALA-A PIPE WATER SUPPLY SCHEME , SM/14976 New New Service connection for Bahir Sarbamangala (Part-A) PWSS TW-2. BILL/02896/2023-2024 BP-2023-24-625 07/03/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 4.52 0.00 0 0
348 PURBA BARDHAMAN Burdwan-I Central Mechanical BAHIR SARBAMANGALA-A PIPE WATER SUPPLY SCHEME , SM/14976 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at Bahir Sarbamangala-A Water Supply Scheme [ Block- Burdwan-1 ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER Junior Engineer ORD/001050/2023-2024 4045/CMD 29/08/2023 672 P.K. ENGINEERING 29.35 0.00 0 45
349 PURBA BARDHAMAN Mangolkote Burdwan Division LAKHURIA PIPE WATER SUPPLY SCHEME , SM/14918 New Material Requisition To Resource Division RTOR000114/2023-2024 1965/BWD 26/04/2023 0 Resource Division 1.64 0.00 0 0
350 PURBA BARDHAMAN Mangolkote Burdwan Division LAKHURIA PIPE WATER SUPPLY SCHEME , SM/14918 New Material Requisition To Resource Division RTOR000393/2023-2024 2197/BWD 12/05/2023 0 Resource Division 5.83 0.00 0 0
351 PURBA BARDHAMAN Mangolkote Central Mechanical LAKHURIA PIPE WATER SUPPLY SCHEME , SM/14918 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Jabagram & others water supply scheme under Mangalkote Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. Driller In-Charge Junior Engineer ORD/000118/2024-2025 2590/CMD 27/08/2024 90 M/S SAJAHAN CHOWDHURY 62.06 0.00 0 0
352 PURBA BARDHAMAN Mangolkote Burdwan Division LAKHURIA PIPE WATER SUPPLY SCHEME , SM/14918 New Continuation Work Order for Supply of 1 (one) No. Inspection Vehicle for different JJM Related Works as and when required including supply of driver and fuels (Minimum 8 Hours of duty) under Katwa Sub-Division within Burdwan Division, P.H.E. Dte. Consider 96.00 Km run per Day Assistant Engineer JUNIOR ENGINEER KATWA SUB-DIVISION PHE DTE ORD/000107/2024-2025 485/KTS 16/04/2024 72 AJIT SAMANTA 0.92 0.23 25 10
353 PURBA BARDHAMAN Mangolkote Burdwan Division LAKHURIA PIPE WATER SUPPLY SCHEME , SM/14918 New Material Requisition To Resource Division RTOR000814/2023-2024 295/BWD 24/01/2024 0 Resource Division 20.47 0.00 0 0
354 PURBA BARDHAMAN Mangolkote Central Mechanical LAKHURIA PIPE WATER SUPPLY SCHEME , SM/14918 New Quotation for new service connection at Lakhuria PWSS PH-I. BILL/00342/2024-2025 BP-2024-25-165 01/07/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.70 0.00 0 0
355 PURBA BARDHAMAN Mangolkote Central Mechanical LAKHURIA PIPE WATER SUPPLY SCHEME , SM/14918 New Quotation for new service connection at Lakhuria PWSS PH-2. BILL/00345/2024-2025 BP-2024-25-166 01/07/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 6.69 0.00 0 0
356 PURBA BARDHAMAN Mangolkote Burdwan Division LAKHURIA PIPE WATER SUPPLY SCHEME , SM/14918 New LAKHURIA Piped Water Supply Scheme with sinking of Tube-well, LDS, Construction of 150 cum RCC OHR with 20 mtr. staging height including soil testing, Rising Main, FHTC & construction of switch rooms & boundary walls with gates and land development, drain and internal pathway at different TW site under Mangolkote Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer JUNIOR ENGINEER R.W.S. BURDWAN SUB-DIVISION PHE DTE ORD/000526/2023-2024 3619/BWD 18/08/2023 867 SK ABDUL LALAN 317.51 83.16 26.19 53
357 PURBA BARDHAMAN Raina-I Central Mechanical HARISHNAPUR PIPED WATER SUPPLY SCHEME , SM/15319 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at Harishnapur Water Supply Scheme [ Block- Raina-1 ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000721/2023-2024 4032/CMD 29/08/2023 30 SUBRATA BHADRA 28.96 0.00 0 0
358 PURBA BARDHAMAN Raina-I Burdwan Division HARISHNAPUR PIPED WATER SUPPLY SCHEME , SM/15319 New Material Requisition To Resource Division RTOR000275/2023-2024 2197/BWD 12/05/2023 0 Resource Division 8.85 0.00 0 0
359 PURBA BARDHAMAN Raina-I Burdwan Division HARISHNAPUR PIPED WATER SUPPLY SCHEME , SM/15319 New Material Requisition To Resource Division RTOR000481/2023-2024 4005/BWD 08/09/2023 0 Resource Division 10.43 0.00 0 0
360 PURBA BARDHAMAN Raina-I Burdwan Division HARISHNAPUR PIPED WATER SUPPLY SCHEME , SM/15319 New Material Requisition To Resource Division RTOR000670/2023-2024 5084/BWD 23/11/2023 0 Resource Division 20.46 0.00 0 0
361 PURBA BARDHAMAN Raina-I Central Mechanical HARISHNAPUR PIPED WATER SUPPLY SCHEME , SM/15319 New New service connection charges for Harishnapur PWSS TW-01 BILL/02411/2023-2024 BP-2023-24-495 06/02/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.92 0.00 0 0
362 PURBA BARDHAMAN Raina-I Central Mechanical HARISHNAPUR PIPED WATER SUPPLY SCHEME , SM/15319 New New Service connection at HARISHNAPUR, PWSS. BILL/02358/2023-2024 BP-2023-24-483 31/01/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.37 0.00 0 0
363 PURBA BARDHAMAN Raina-I Burdwan Division HARISHNAPUR PIPED WATER SUPPLY SCHEME , SM/15319 New Different works related (sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of different capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site) to BAJITPUR, SHUKUR & HARISHNAPUR Piped Water Supply Scheme under RAINA-I Block, District:- Purba Bardhaman [NEW SCHEME] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000388/2023-2024 3197/BWD 24/07/2023 365 MRITYUNJOY MUKHERJEE & CO. 1,242.03 51.36 4.14 55
364 PURBA BARDHAMAN Raina-I Central Mechanical HARISHNAPUR PIPED WATER SUPPLY SCHEME , SM/15319 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Bajitpur, Belsar & other water supply scheme under Raina-1 Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000117/2024-2025 2589/CMD 27/08/2024 90 DEY ENTERPRISE 74.58 0.00 0 10
365 PURBA BARDHAMAN Katwa-II Burdwan Division MAKHALTOR PIPED WATER SUPPLY SCHEME , SM/15153 New Material Requisition To Resource Division RTOR000064/2022-2023 1260/BWD 17/03/2023 0 Resource Division 6.59 0.00 0 0
366 PURBA BARDHAMAN Katwa-II Central Mechanical MAKHALTOR PIPED WATER SUPPLY SCHEME , SM/15153 New New service connection charges for Makhaltor W/S Scheme TW-2 BILL/00697/2023-2024 BP-2023-24-38 27/06/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 9.11 0.00 0 0
367 PURBA BARDHAMAN Katwa-II Central Mechanical MAKHALTOR PIPED WATER SUPPLY SCHEME , SM/15153 New New service connection charges of Makhaltor W/S Scheme TW-1 BILL/00687/2023-2024 BP-2023-24-35 26/06/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.30 0.00 0 0
368 PURBA BARDHAMAN Katwa-II Burdwan Division MAKHALTOR PIPED WATER SUPPLY SCHEME , SM/15153 New MAKHALTOR Piped Water Supply Scheme with sinking of Tube-well, LDS, Rising Main, FHTC & construction of switch rooms & boundary walls with gates and land development, drain and internal pathway at different TW site under Katwa-II Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer JUNIOR ENGINEER KATWA SUB-DIVISION PHE DTE ORD/000733/2022-2023 1050/BWD 10/03/2023 663 HAMID SK 195.79 198.13 101.2 99
369 PURBA BARDHAMAN Katwa-II Central Mechanical MAKHALTOR PIPED WATER SUPPLY SCHEME , SM/15153 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Mulgram & others water supply scheme under Katwa-II Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. ASSISTANT ENGINEER Junior Engineer ORD/000070/2024-2025 2409/CMD 02/08/2024 90 DUTTA ENTERPRISE 50.18 0.00 0 0
370 PURBA BARDHAMAN Katwa-II Burdwan Division MAKHALTOR PIPED WATER SUPPLY SCHEME , SM/15153 New Providing left out FHTC at different area under the command area of Makhaltore PWSS (SM/15153) in order to declare Sajal Gram and other anciallary works, Katwa II Block under Katwa Sub Division, PHE. Dte. Assistant Engineer JUNIOR ENGINEER KATWA SUB-DIVISION PHE DTE ORD/001310/2024-2025 1085/BWD 28/03/2025 30 HAMID SK 7.42 0.00 0 70
371 PURBA BARDHAMAN Burdwan-II Central Mechanical GROUND WATER BASED GANGPUR PIPED WATER SUPPLY SCHEME , SM/15487 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at Gangpur Water Supply Scheme [ Block- Burdwan-2 ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER Junior Engineer ORD/000670/2023-2024 4008/CMD 29/08/2023 30 CHATTERJEE ENTERPRISE 28.95 0.00 0 0
372 PURBA BARDHAMAN Burdwan-II Burdwan Division GROUND WATER BASED GANGPUR PIPED WATER SUPPLY SCHEME , SM/15487 New Material Requisition To Resource Division RTOR000023/2023-2024 1962/BWD 25/04/2023 0 Resource Division 6.43 0.00 0 0
373 PURBA BARDHAMAN Burdwan-II Burdwan Division GROUND WATER BASED GANGPUR PIPED WATER SUPPLY SCHEME , SM/15487 New Material Requisition To Resource Division RTOR000401/2023-2024 3873/BWD 01/09/2023 0 Resource Division 5.75 0.00 0 0
374 PURBA BARDHAMAN Burdwan-II Burdwan Division GROUND WATER BASED GANGPUR PIPED WATER SUPPLY SCHEME , SM/15487 New Material Requisition To Resource Division RTOR000255/2023-2024 2197/BWD 12/05/2023 0 Resource Division 4.55 0.00 0 0
375 PURBA BARDHAMAN Burdwan-II Burdwan Division GROUND WATER BASED GANGPUR PIPED WATER SUPPLY SCHEME , SM/15487 New Material Requisition To Resource Division RTOR000566/2023-2024 4920/BWD 10/11/2023 0 Resource Division 42.46 0.00 0 0
376 PURBA BARDHAMAN Burdwan-II Burdwan Division GROUND WATER BASED GANGPUR PIPED WATER SUPPLY SCHEME , SM/15487 New Material Requisition To Resource Division RTOR000012/2024-2025 4112/BWD 25/11/2024 0 Resource Division 15.69 0.00 0 0
377 PURBA BARDHAMAN Burdwan-II Central Mechanical GROUND WATER BASED GANGPUR PIPED WATER SUPPLY SCHEME , SM/15487 New NEW SERVICE CONNECTION FOR GANGPUR TW 1. BILL/02953/2023-2024 BP-2023-24-636 15/03/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 7.74 0.00 0 0
378 PURBA BARDHAMAN Burdwan-II Central Mechanical GROUND WATER BASED GANGPUR PIPED WATER SUPPLY SCHEME , SM/15487 New Quotation for new service connection Gangpur PWSS TW-2. BILL/00322/2024-2025 BP-2024-25-163 01/07/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.72 0.00 0 0
379 PURBA BARDHAMAN Burdwan-II Burdwan Division GROUND WATER BASED GANGPUR PIPED WATER SUPPLY SCHEME , SM/15487 New Different works related (sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of different capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site) to BALGANA & GANGPUR Piped Water Supply Scheme under Burdwan ¿ II Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. Junior Engineer, Burdwan Sadar Sub-Division ORD/000538/2023-2024 3699/BWD 24/08/2023 769 SUPRITI ENTERPRISE 1,345.79 9.03 0.67 20
380 PURBA BARDHAMAN Burdwan-II Central Mechanical GROUND WATER BASED GANGPUR PIPED WATER SUPPLY SCHEME , SM/15487 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at KUSHA & others water supply scheme under Bardhaman-II Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman ASSISTANT ENGINEER Junior Engineer ORD/000065/2024-2025 2389/CMD 02/08/2024 90 DILIP MAHATO 53.14 0.00 0 12
381 PURBA BARDHAMAN Ketugram-I Central Drilling SRIPUR PIPE WATER SUPPLY SCHEME , SM/15158 New Providing drilling crew and other allied works for construction of Tube Well ( 250mm X200mm X 114 Mtrs. Depth) by utilising Departmental Machineries for Sripur Scheme (T/W-I & II) , Ketugram-I Block under Purba Bardhaman District, Central Drilling Division, P.H.E. Dte. Driller In Charge Junior Engineer ORD/000159/2023-2024 860/CDD 10/07/2023 30 OSMAN SEKH 16.62 0.00 0 0
382 PURBA BARDHAMAN Ketugram-I Burdwan Division SRIPUR PIPE WATER SUPPLY SCHEME , SM/15158 New Material Requisition To Resource Division RTOR000014/2023-2024 1962/BWD 25/04/2023 0 Resource Division 1.55 0.00 0 0
383 PURBA BARDHAMAN Ketugram-I Burdwan Division SRIPUR PIPE WATER SUPPLY SCHEME , SM/15158 New Material Requisition To Resource Division RTOR000325/2023-2024 2197/BWD 12/05/2023 0 Resource Division 9.91 0.00 0 0
384 PURBA BARDHAMAN Ketugram-I Burdwan Division SRIPUR PIPE WATER SUPPLY SCHEME , SM/15158 New Material Requisition To Resource Division RTOR000614/2023-2024 4916/BWD 10/11/2023 0 Resource Division 19.75 0.00 0 0
385 PURBA BARDHAMAN Ketugram-I Central Mechanical SRIPUR PIPE WATER SUPPLY SCHEME , SM/15158 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Rajur & others water supply scheme under Ketugram-I Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. Driller In-Charge Junior Engineer ORD/000098/2024-2025 2407/CMD 02/08/2024 90 M.S. ENTERPRISE 82.29 0.00 0 0
386 PURBA BARDHAMAN Ketugram-I Burdwan Division SRIPUR PIPE WATER SUPPLY SCHEME , SM/15158 New Balance work for OHR, extension of pipeline to provide FHTC with sinking of tube well, construction of pump house, boundary wall, land development, plinth protection for pump house, approach road & other related work under Ankhona, Pandugram, Sripur PWSS under Katwa Sub Division, Block- Ketugram-I, Burdwan Division PHE Dte. Assistant Engineer JUNIOR ENGINEER R.W.S. BURDWAN SUB-DIVISION PHE DTE ORD/000286/2024-2025 2738/BWD 12/07/2024 173 PUSPA ENTERPRISE 128.29 0.00 0 75
387 PURBA BARDHAMAN Ketugram-I Central Mechanical SRIPUR PIPE WATER SUPPLY SCHEME , SM/15158 New New Service connection at Sripur PWSS TW-1 BILL/02371/2023-2024 BP-2023-24-489 01/02/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 1.49 0.00 0 0
388 PURBA BARDHAMAN Ketugram-I Central Mechanical SRIPUR PIPE WATER SUPPLY SCHEME , SM/15158 New New service connection at Sripur PWSS TW No.2 BILL/02373/2023-2024 BP-2023-24-490 01/02/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 4.54 0.00 0 0
389 PURBA BARDHAMAN Ketugram-I Central Mechanical SRIPUR PIPE WATER SUPPLY SCHEME , SM/15158 New NEW SERVICE CONNECTION FOR SRIPUR PWSS PH-2. BILL/00104/2024-2025 BP-2024-25-45 26/04/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 0.76 0.00 0 0
390 PURBA BARDHAMAN Ketugram-I Burdwan Division SRIPUR PIPE WATER SUPPLY SCHEME , SM/15158 New Different works related (sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of different capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site) to ANKHONA, PANDUGRAM & SRIPUR Piped Water Supply Scheme under KETUGRAM¿I Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer JUNIOR ENGINEER R.W.S. BURDWAN SUB-DIVISION PHE DTE ORD/000436/2023-2024 3388/BWD 03/08/2023 882 PUSPA ENTERPRISE 989.13 143.77 14.53 50
391 PURBA BARDHAMAN Burdwan Division AUGUMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR BAGILA , SM/15192 Augmentation Construction of Pump House cum chlorine room without sanitary and water supply arrangement at 3rd Tube well site at Bagila village to departmental drawing no-PHE/BD/P.H/DRG/02/DEC-17(Size 3.60 mtr x 3.00 mtr room) for BAGILA its Adjoining Mouza W/S scheme, block -MEMARI-I within Burdwan Sub-Division ,PHE Dte._2ND CALL JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000096/2023-2024 809/BSD 03/05/2023 45 A R TRADERS 3.60 3.55 98.61 100
392 PURBA BARDHAMAN Burdwan Division AUGUMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR BAGILA , SM/15192 Augmentation Laying of 150mm DI pipeline between Bagila health centre to Bagila Baroaritala for BAGILA Piped Water Supply Scheme to provide house connection under memari-I block within Burdwan Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000336/2023-2024 1473/BSD 12/07/2023 15 A R TRADERS 0.97 0.94 96.91 100
393 PURBA BARDHAMAN Burdwan Division AUGUMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR BAGILA , SM/15192 Augmentation Preparation and Submission of DPR for Augmentation of Bagila PWSS under Memari-I Development Block under Burdwan Division, P.H.E Dte.[2nd Call] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000396/2023-2024 1584/BSD 24/07/2023 15 MEASURE LAND 0.78 0.77 98.72 100
394 PURBA BARDHAMAN Central Mechanical AUGUMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR BAGILA , SM/15192 Augmentation New service connection charges for Aug. Bagila PWSS TW-3 BILL/00769/2023-2024 BP-2023-24-67 20/07/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 8.18 0.00 0 0
395 PURBA BARDHAMAN Central Mechanical AUGUMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR BAGILA , SM/15192 Augmentation Illumination arrangement & different electro-mechanical works at BAGILA water supply scheme under Memari-I Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. ASSISTANT ENGINEER Junior Engineer ORD/000414/2024-2025 2795/CMD 01/10/2024 60 GOENKA ENTERPRISE 14.16 0.00 0 0
396 PURBA BARDHAMAN Central Mechanical AUGUMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR BAGILA , SM/15192 Augmentation Supply & Installation of Submersible Pumping Machinery , Voltage Stabilizer, Chlorination system and internal House wiring for Tube well no.- 1 at Augumentation of Bagila Water Supply Scheme under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER Junior Engineer ORD/000085/2023-2024 2591/CMD 07/06/2023 30 SUBRATA BHADRA 11.09 10.60 95.58 50
397 PURBA BARDHAMAN Burdwan Division AUGUMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR BAGILA , SM/15192 Augmentation Interconnection between Head Work site T/W to 2nd T/W site for BAGILA Piped Water Supply Scheme to provide house connection within Burdwan Sub-Division under Burdwan Division, PHE Dte. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000182/2023-2024 1006/BSD 06/06/2023 30 A R TRADERS 0.96 0.95 98.96 100
398 PURBA BARDHAMAN Burdwan Division AUGUMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR BAGILA , SM/15192 Augmentation Restoration Rising main line for FHTC work and Construction of boundary wall at Head work site with gate and land development, drain and internal pathway and for BAGILA PWSS under Memari-I Block, District:- Purba-Bardhaman. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000904/2023-2024 5381/BWD 08/12/2023 60 SK RAJU 35.42 34.69 97.94 100
399 PURBA BARDHAMAN Central Mechanical AUGUMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR BAGILA , SM/15192 Augmentation Supply & delivery of standby Submersible pumping machinery & automatic Chlorinator for Bagila & others water supply scheme, under CMD, P.H.E. Dte., Dist.- Purba Bardhaman ASSISTANT ENGINEER Junior Engineer ORD/001416/2023-2024 152/CMSD 22/01/2024 15 BEHERA ENTERPRISE 1.74 1.74 100 100
400 PURBA BARDHAMAN Central Mechanical AUGUMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR BAGILA , SM/15192 Augmentation Electric quotation for New Service Connection at Bagila W/S (Aug.) Scehem PH-IV. BILL/01783/2023-2024 BP-2023-24-291 26/12/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.43 0.00 0 0
401 PURBA BARDHAMAN Burdwan Division AUGUMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR BAGILA , SM/15192 Augmentation Augmentation of BAGILA Piped Water Supply Scheme with sinking of Tube-well, LDS & FHTC For Songoti Pally, LDS & FHTC For Station Para & LDS & FHTC For Taktipur, Baharampur, Krishnapur, Talchina & Kiskinda Habitation under Memari-I Block, District:- Purba-Bardhaman. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000172/2023-2024 3036/BWD 14/07/2023 537 H SAMANTA 149.26 142.33 95.36 85
402 PURBA BARDHAMAN Burdwan Division AUGUMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR BAGILA , SM/15192 Augmentation Replacement of Tube-well & Rising main at HEAD TW SITE for Aug. of BAGILA, SASINARA ZONE-I, SASINARA ZONE-II, Piped Water Supply Scheme within MEMARI-I Block under Burdwan Division, PHE. Dte. District:- Purba-Bardhaman. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000974/2023-2024 027/BWD 03/01/2024 60 KOUSIK MALLICK 38.87 30.63 78.8 90
403 PURBA BARDHAMAN Burdwan Division AUGUMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR BAGILA , SM/15192 Augmentation Balance pipeline work on distribution system for FHTC work for BAGILA Piped Water Supply Scheme at BAHARAMPUR mouza within MEMARI - I BLOCK under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/001069/2024-2025 359/BWD 16/01/2025 60 H SAMANTA 10.15 0.00 0 100
404 PURBA BARDHAMAN Burdwan Division AUGUMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR BAGILA , SM/15192 Augmentation Providing FHTC work on distribution system for FHTC work for BAGILA Piped W/S. Scheme at berhampur, Krishnapur, Kiskinda, Taktipur mouza within Memari I Block under Burdwan Divn., PHE. Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000713/2025-2026 2289/BWD 06/08/2025 45 H SAMANTA 9.73 0.00 0 0
405 PURBA BARDHAMAN Burdwan Division AUGUMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR BAGILA , SM/15192 Augmentation Designing,making and erection of Sign Board for SWAJAL GRAM in Krishnapur village of Memari-I Block under Bagila Piped Water Supply Scheme within Burdwan Sub-Division under Burdwan Division,PHE Dte(5 nos Board) ORD/000506/2025-2026 2350/BSD 21/08/2025 10 RAJ-N-MAHARAJ MANPOWER & SECURITY SOLUTIONS 0.72 0.00 0 0
406 PURBA BARDHAMAN Burdwan Division AUGUMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR BAGILA , SM/15192 Augmentation Providing balance FHTC work on distribution system for FHTC work for BAGILA Piped Water Supply Scheme at various mouza within Memari I Block under Burdwan Divn., PHE. Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000687/2025-2026 1407/BWD 16/05/2025 45 H SAMANTA 10.20 0.00 0 0
407 PURBA BARDHAMAN Mangolkote Burdwan Division CHAKULIA PIPE WATER SUPPLY SCHEME , SM/15162 New Material Requisition To Resource Division RTOR000032/2023-2024 1962/BWD 25/04/2023 0 Resource Division 1.38 0.00 0 0
408 PURBA BARDHAMAN Mangolkote Burdwan Division CHAKULIA PIPE WATER SUPPLY SCHEME , SM/15162 New Material Requisition To Resource Division RTOR000288/2023-2024 2197/BWD 12/05/2023 0 Resource Division 7.80 0.00 0 0
409 PURBA BARDHAMAN Mangolkote Burdwan Division CHAKULIA PIPE WATER SUPPLY SCHEME , SM/15162 New Material Requisition To Resource Division RTOR000713/2023-2024 5047/BWD 23/11/2023 0 Resource Division 19.78 0.00 0 0
410 PURBA BARDHAMAN Mangolkote Central Mechanical CHAKULIA PIPE WATER SUPPLY SCHEME , SM/15162 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Jabagram & others water supply scheme under Mangalkote Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. Driller In-Charge Junior Engineer ORD/000118/2024-2025 2590/CMD 27/08/2024 90 M/S SAJAHAN CHOWDHURY 62.06 0.00 0 0
411 PURBA BARDHAMAN Mangolkote Central Drilling CHAKULIA PIPE WATER SUPPLY SCHEME , SM/15162 New Providing drilling crew and other allied works for construction of Tube Well (250mm X150mm X 240 Mtrs. Depth) by utilizing Departmental Machineries for Chakulia W/S Scheme (T/W-I & II), Block- Mangolkote under Purba Bardhman District, Central Drilling Division, P.H.E. Dte. Assistant Engineer Junior Engineer ORD/000198/2023-2024 1339/CDD 13/09/2023 210 M/S SAIKAT ENTERPRISE 23.35 16.79 71.91 100
412 PURBA BARDHAMAN Mangolkote Burdwan Division CHAKULIA PIPE WATER SUPPLY SCHEME , SM/15162 New Supply, delivery, installation & hand hold demonstration of different equipments / machineries to test HDPE pipes as per IS: 4984-2016 at the pipe testing laboratory at Nababhat under Burdwan Division, PHE. Dte._2ND CALL AE(HQs) J.E. 1 BURDWAN ORD/001212/2023-2024 907/BWD 04/03/2024 30 MANASH GHOSH 23.87 5.35 22.41 100
413 PURBA BARDHAMAN Mangolkote Burdwan Division CHAKULIA PIPE WATER SUPPLY SCHEME , SM/15162 New Material Requisition To Resource Division RTOR000014/2024-2025 4110/BWD 25/11/2024 0 Resource Division 9.28 0.00 0 0
414 PURBA BARDHAMAN Mangolkote Central Mechanical CHAKULIA PIPE WATER SUPPLY SCHEME , SM/15162 New Quotation for new service connection for Chakulia PWSS TW-1. BILL/00255/2024-2025 BP-2024-25-134 05/06/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.57 0.00 0 0
415 PURBA BARDHAMAN Mangolkote Central Mechanical CHAKULIA PIPE WATER SUPPLY SCHEME , SM/15162 New Quotation for new service connection for Chakulia PWSS TW-2. BILL/00253/2024-2025 BP-2024-25-133 05/06/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 5.10 0.00 0 0
416 PURBA BARDHAMAN Mangolkote Central Mechanical CHAKULIA PIPE WATER SUPPLY SCHEME , SM/15162 New Additional quotation in second time against additional work at Chakulia PWSS TW-2 BILL/00683/2024-2025 BP-2024-25-268 21/08/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 0.31 0.00 0 0
417 PURBA BARDHAMAN Mangolkote Burdwan Division CHAKULIA PIPE WATER SUPPLY SCHEME , SM/15162 New Different works related (sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of different capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site) to CHAKULIA, KULSANA & HALIMPUR Piped Water Supply Scheme under MONGALKOTE Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer J.E. katwa,JUNIOR ENGINEER R.W.S. BURDWAN SUB-DIVISION PHE DTE ORD/000461/2023-2024 3443/BWD 08/08/2023 836 ASHOK KUMAR GHOSH 1,588.10 86.62 5.45 15
418 PURBA BARDHAMAN Mangolkote Central Mechanical CHAKULIA PIPE WATER SUPPLY SCHEME , SM/15162 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System, Internal House Wiring and Compound lighting arrangement for Tube well No.- 1 & 2 at CHAKULIA Water Supply Scheme [BLOCK- MANGOLKOTE] under CMD, PHE Dte., Dist.- Purba-Bardhaman Driller In-Charge Junior Engineer ORD/001604/2023-2024 1534/CMD 05/03/2024 626 CHATTERJEE ENTERPRISE 28.81 6.90 23.95 70
419 PURBA BARDHAMAN Mangolkote Burdwan Division CHAKULIA PIPE WATER SUPPLY SCHEME , SM/15162 New Balance work of CHAKULIA Piped Water Supply Scheme with sinking of Tube-well, LDS, FHTC & construction of switch rooms & boundary walls with gates and land development, drain and internal pathway at different TW site under Mongalkote Block, District:- Purba-Bardhaman Assistant Engineer ORD/001263/2024-2025 846/BWD 05/03/2025 120 M/S M.M. ENTERPRISE 214.08 0.00 0 0
420 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR NATU , SM/15203 Augmentation Sinking of 300 X 200mm dia Tube Well 150 mtr. Depth by D.R. Rig method using UPVC pipe (CD) and UPVC Deep Well Screen (RDS) for 3RD TW site of NATU W/S Scheme under Raina - I Block within Burdwan Sub-Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000204/2023-2024 2707/BWD 08/06/2023 30 M/S D. PALIT & CO. 13.25 11.23 84.75 100
421 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR NATU , SM/15203 Augmentation Preparation and Submission of DPR for Augmentation of Natu PWSS under Raina-I Development Block under Burdwan Division, P.H.E Dte.[2nd Call] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000398/2023-2024 1586/BSD 24/07/2023 15 GEO-SOLUTION 0.78 0.77 98.72 100
422 PURBA BARDHAMAN Central Mechanical AUGMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR NATU , SM/15203 Augmentation Supply & Installation of Submersible Pumping Machinery , Voltage Stabilizer, Chlorination system and internal House wiring for Tube well no.- 1 at Augumentation of Natu Water Supply Scheme under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000097/2023-2024 2598/CMD 07/06/2023 30 ELECTRICAL & MECHANICAL ENGINEERING CORPORATION 11.15 10.02 89.87 96
423 PURBA BARDHAMAN Central Mechanical AUGMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR NATU , SM/15203 Augmentation NEW SERVICE CONNECTION FOR NATU (AUGMENTATION) PWSS TW 03 BILL/00118/2024-2025 BP-2024-25-58 26/04/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 10.49 0.00 0 0
424 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR NATU , SM/15203 Augmentation Extension of Pipeline for providing Functional Household Tap Connection (FHTC) at Birupur & Sudarshanpur village under NATU Piped Water Supply Scheme, Block- Raina-I within Burdwan Sub Division under Burdwan Division PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/001035/2023-2024 675/BWD 19/02/2024 424 KALYAN CHOWDHURY 7.49 0.00 0 100
425 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR NATU , SM/15203 Augmentation Laying Parallel Pipeline to improve drinking water supply, Construction of Boundary wall, Path Way, Drain at Head Work Site and providing leftout FHTC, Road Restoration with allied work for NATU Piped Water Supply Scheme, Block-Raina-I within Burdwan Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000373/2024-2025 2994/BWD 01/08/2024 487 ANWESHA CONSTRUCTION 55.19 0.00 0 75
426 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR NATU , SM/15203 Augmentation Extension Pipeline with Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of Birupur & Siyali of NATU Piped Water Supply Scheme within Raina I Block of Burdwan Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000813/2022-2023 1576/BWD 31/03/2023 761 KALYAN CHOWDHURY 30.88 22.80 73.83 100
427 PURBA BARDHAMAN Central Mechanical AUGMENTATION OF SATGACHIA PWSS (ZONE-I)(PART-B) , SM/15178 Augmentation Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination system and internal House wiring for Tube well no.- 1 & 2 at Augumentation of SATGACHIA(Z-I, Part-B)[MEMARI-II] Water Supply Scheme under CMD, PHE Dte., Dist.- Purba-Bardhaman ORD/000934/2023-2024 4197/CMD 29/08/2023 30 DAS TRADING CO. 24.41 0.00 0 0
428 PURBA BARDHAMAN Central Mechanical AUGMENTATION OF SATGACHIA PWSS (ZONE-I)(PART-B) , SM/15178 Augmentation Illumination arrangement & different electro-mechanical works at SATGACHIA (Zone-I, Part-B) water supply scheme under Memari-II Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman ASSISTANT ENGINEER Junior Engineer ORD/000417/2024-2025 2801/CMD 01/10/2024 60 S.K. ELECTRICALS 12.53 0.00 0 0
429 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF SATGACHIA PWSS (ZONE-I)(PART-B) , SM/15178 Augmentation Restoration of Pump House at Head Work site of Satgachia Zone-I Piped water supply scheme at Memari-II BlockUnder Burdwan Division, Dist.-Purba Bardhaman. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE,JUNIOR ENGINEER RWS BURDWAN SUB-DIVISION PHE DTE ORD/000179/2024-2025 998/BSD 06/06/2024 30 INDRAJIT MONDAL 0.96 0.43 44.79 90
430 PURBA BARDHAMAN Central Mechanical AUGMENTATION OF SATGACHIA PWSS (ZONE-I)(PART-B) , SM/15178 Augmentation NEW SERVICE CONNECTION FOR AUGMENTATION OF SATGACHIA PWSS BILL/02825/2023-2024 BP-2023-24-593 04/03/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 5.58 0.00 0 0
431 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF SATGACHIA PWSS (ZONE-I)(PART-B) , SM/15178 Augmentation 150MM DI bypass pipeline at DVC Canel side for smooth water supply for FHTC from Patra mouza to Katna, Shrirampur & Begunia mouza under satgachia zone- I pwss within Memari- II block under Burdwan Division PHE DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/001335/2024-2025 633/BSD 19/03/2025 30 M/S ANAND CONSTRUCTION 4.94 0.00 0 0
432 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF SATGACHIA PWSS (ZONE-I)(PART-B) , SM/15178 Augmentation Different Types of work involved in connection with different Augmentation & Retrofitting Schemes (06 Nos.) Piped Water Supply Scheme under Memari II Block within Burdwan Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/001269/2024-2025 848/BWD 05/03/2025 120 PROJECT INDIA 394.29 0.00 0 0
433 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF SATGACHIA PWSS (ZONE-I)(PART-B) , SM/15178 Augmentation Restoration of Conc. road, Providing leftout FHTC with extension of Pipeline, construction of Pathway, drain, repairing of Pump House at Head Work site with allied works for MAGRA, SANUI, SATGACHIA Zone-I & NARAGOHALIA PIPED WATER SUPPLY SCHEME, Block-Memari-I, within Burdwan Sub Division under Burdwan Division PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/001192/2024-2025 611/BWD 11/02/2025 180 M/S ASHA CONSTRUCTION 354.13 0.00 0 25
434 PURBA BARDHAMAN Raina-I Burdwan Division UCHITPUR PIPED WATER SUPPLY SINGLE VILLAGE SCHEME , SM/16254 New UCHITPUR Single Village Scheme with sinking of Tube-well, LDS, Rising Main, FHTC & construction of switch rooms & boundary walls with gates and land development, drain and internal pathway at different TW site under Raina-I Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000789/2022-2023 1422/BWD 24/03/2023 90 ANWESHA CONSTRUCTION 77.19 76.95 99.69 100
435 PURBA BARDHAMAN Raina-I Burdwan Division UCHITPUR PIPED WATER SUPPLY SINGLE VILLAGE SCHEME , SM/16254 New Material Requisition To Resource Division RTOR000422/2023-2024 3839/BWD 01/09/2023 0 Resource Division 1.31 0.00 0 0
436 PURBA BARDHAMAN Raina-I Burdwan Division UCHITPUR PIPED WATER SUPPLY SINGLE VILLAGE SCHEME , SM/16254 New Material Requisition To Resource Division RTOR000698/2023-2024 5068/BWD 23/11/2023 0 Resource Division 20.46 0.00 0 0
437 PURBA BARDHAMAN Raina-I Central Mechanical UCHITPUR PIPED WATER SUPPLY SINGLE VILLAGE SCHEME , SM/16254 New New service connection charges for Uchitpur PWSS TW-1 BILL/00776/2023-2024 BP-2023-24-79 24/07/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 6.26 0.00 0 0
438 PURBA BARDHAMAN Raina-I Burdwan Division UCHITPUR PIPED WATER SUPPLY SINGLE VILLAGE SCHEME , SM/16254 New Extension of pipeline & installation of Air Valve for providing FHTC at Dharapara & Malick para of Uchitpur village for UCHITPUR Piped Water Supply Scheme[New Scheme], Block- Raina-I within Burdwan Sub Division under Burdwan Division PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/001171/2023-2024 530/BSD 14/03/2024 30 ANWESHA CONSTRUCTION 0.96 0.00 0 0
439 PURBA BARDHAMAN Raina-I Burdwan Division UCHITPUR PIPED WATER SUPPLY SINGLE VILLAGE SCHEME , SM/16254 New Providing FHTC at leftour part of Malik Para of Uchitpur Village under UCHITPUR Piped Water Supply Scheme, Block- Raina-I within Burdwan Sub Division under Burdwan Division PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/001037/2023-2024 281/BSD 09/02/2024 30 ANWESHA CONSTRUCTION 0.95 0.95 100 100
440 PURBA BARDHAMAN Raina-I Burdwan Division UCHITPUR PIPED WATER SUPPLY SINGLE VILLAGE SCHEME , SM/16254 New Providing FHTC at leftour part of Dhara Para of Uchitpur Village under UCHITPUR Piped Water Supply Scheme, Block- Raina-I within Burdwan Sub Division under Burdwan Division PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/001094/2023-2024 518/BSD 13/03/2024 30 ANWESHA CONSTRUCTION 0.95 0.81 85.26 100
441 PURBA BARDHAMAN Raina-I Central Mechanical UCHITPUR PIPED WATER SUPPLY SINGLE VILLAGE SCHEME , SM/16254 New Supply and Delivery of standby pump motor set for Sipta, Uchitpur, Haripur & others Water Supply Scheme under CMD, PHE Dte. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000142/2024-2025 2596/CMD 27/08/2024 30 JOYGURU ENTERPRISE 4.72 1.40 29.66 100
442 PURBA BARDHAMAN Raina-I Central Mechanical UCHITPUR PIPED WATER SUPPLY SINGLE VILLAGE SCHEME , SM/16254 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at Uchitpur Water Supply Scheme [ Block- Raina-1 ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000146/2023-2024 2881/CMD 07/07/2023 331 WEST BENGAL ENGINEERING CO. 28.96 11.44 39.5 100
443 PURBA BARDHAMAN Raina-I Central Mechanical UCHITPUR PIPED WATER SUPPLY SINGLE VILLAGE SCHEME , SM/16254 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Bajitpur, Belsar & other water supply scheme under Raina-1 Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000117/2024-2025 2589/CMD 27/08/2024 90 DEY ENTERPRISE 74.58 0.00 0 10
444 PURBA BARDHAMAN Central Mechanical AUGMENTATION OF SAHAPUR PIPED WATER SUPPLY SCHEME , SM/16022 Augmentation New service connection charges for Sahapur PWSS TW-1 BILL/01521/2023-2024 BP-2023-24-187 09/10/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.16 0.00 0 0
445 PURBA BARDHAMAN Central Mechanical AUGMENTATION OF SAHAPUR PIPED WATER SUPPLY SCHEME , SM/16022 Augmentation Supply & Installation of Submersible Pumping Machinery , Voltage Stabilizer, Chlorination system and internal House wiring for Tube well no.- 1&2 at Augumentation of Sahapur Water Supply Scheme under CMD, PHE Dte., Dist.- Purba-Bardhaman. Driller In-Charge Junior Engineer ORD/000096/2023-2024 2586/CMD 07/06/2023 30 M/S, S.S. ENTERPRISE. 22.60 0.00 0 46
446 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF SAHAPUR PIPED WATER SUPPLY SCHEME , SM/16022 Augmentation Augmentation of SAHAPUR Piped Water Supply Scheme with sinking of Tube-well, LDS, Rising Main, FHTC & renovation of switch-rooms & boundary walls at different TW site under Katwa-II Block, District:- Purba-Bardhaman. Assistant Engineer JUNIOR ENGINEER KATWA SUB-DIVISION PHE DTE ORD/000132/2023-2024 2343/BWD 22/05/2023 120 KHEPIMA ENGINEERS CO. OPERATIVE SOCIETY LTD. 137.76 128.04 92.94 95
447 PURBA BARDHAMAN Ketugram-I Central Drilling MAHULA PIPED WATER SUPPLY SCHEME , SM/16025 New Providing drilling crew and other allied works for construction of Tube Well (250mm X200mm X 114 Mtrs. Depth) by utilizing Departmental Machineries for Mahula W/S Scheme (T/W-I & II) , Ketugram-I Block under Purba Bardhman District, Central Drilling Division, P.H.E. Dte. Driller In Charge Junior Engineer ORD/000161/2023-2024 1057/CDD 16/08/2023 30 C.M. ENTERPRISE 16.20 0.00 0 0
448 PURBA BARDHAMAN Ketugram-I Burdwan Division MAHULA PIPED WATER SUPPLY SCHEME , SM/16025 New Material Requisition To Resource Division RTOR000052/2023-2024 1962/BWD 25/04/2023 0 Resource Division 2.27 0.00 0 0
449 PURBA BARDHAMAN Ketugram-I Burdwan Division MAHULA PIPED WATER SUPPLY SCHEME , SM/16025 New Material Requisition To Resource Division RTOR000337/2023-2024 2197/BWD 12/05/2023 0 Resource Division 9.89 0.00 0 0
450 PURBA BARDHAMAN Ketugram-I Burdwan Division MAHULA PIPED WATER SUPPLY SCHEME , SM/16025 New Material Requisition To Resource Division RTOR000626/2023-2024 4872/BWD 10/11/2023 0 Resource Division 29.60 0.00 0 0
451 PURBA BARDHAMAN Ketugram-I Burdwan Division MAHULA PIPED WATER SUPPLY SCHEME , SM/16025 New MAHULA Piped Water Supply Scheme with sinking of Tube-well, LDS, Construction of 150 cum RCC OHR with 20 mtr. staging height including soil testing, Rising Main, FHTC & construction of switch rooms & boundary walls with gates and land development, drain and internal pathway at different TW site under Ketugram-I Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer JUNIOR ENGINEER R.W.S. BURDWAN SUB-DIVISION PHE DTE ORD/000431/2023-2024 3665/BWD 22/08/2023 300 SUJATA CONSTRUCTION 262.37 140.79 53.66 3
452 PURBA BARDHAMAN Ketugram-I Central Mechanical MAHULA PIPED WATER SUPPLY SCHEME , SM/16025 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Rajur & others water supply scheme under Ketugram-I Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. Driller In-Charge Junior Engineer ORD/000098/2024-2025 2407/CMD 02/08/2024 90 M.S. ENTERPRISE 82.29 0.00 0 0
453 PURBA BARDHAMAN Ketugram-I Central Mechanical MAHULA PIPED WATER SUPPLY SCHEME , SM/16025 New Quotation for new service connection at Mahula PWSS PH-I. BILL/00344/2024-2025 BP-2024-25-173 01/07/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.02 0.00 0 0
454 PURBA BARDHAMAN Ketugram-I Central Mechanical MAHULA PIPED WATER SUPPLY SCHEME , SM/16025 New Quotation for new service connection at Mahula PWSS PH-2. BILL/00350/2024-2025 BP-2024-25-172 01/07/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 4.31 0.00 0 0
455 PURBA BARDHAMAN Ketugram-I Central Mechanical MAHULA PIPED WATER SUPPLY SCHEME , SM/16025 New Supply & Installation of Submersible Pumping Machinery , Voltage Stabilizer, Chlorination system and internal House wiring for Tube well no.- 1 & 2 at MAHULA [KETUGRAM-I] Water Supply Scheme under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER,Driller In-Charge JUNIOR ENGINEER ORD/000882/2023-2024 4145/CMD 29/08/2023 30 P.K. ENGINEERING 21.40 0.00 0 70
456 PURBA BARDHAMAN Ketugram-I Central Mechanical MAHULA PIPED WATER SUPPLY SCHEME , SM/16025 New Supply, delivery of Submersible Pumping Motor and other materials for Tube Well no 1 of Mahula Water Supply Scheme [BLOCK- Ketugram-I] under CMD, PHE Dte., Dist.-Purba-Bardhaman. Driller In-Charge JUNIOR ENGINEER ORD/001638/2024-2025 157/DIC/BMSD(D) 05/03/2025 7 P.K. ENGINEERING 0.97 0.00 0 100
457 PURBA BARDHAMAN Ketugram-I Central Mechanical MAHULA PIPED WATER SUPPLY SCHEME , SM/16025 New Supply, delivery of submersible cable and other materials for Tube Well no 1 of Mahula Water Supply Scheme [ BLOCK- Ketugram-1] under CMD, PH E Dte., Dist.- Purba-Bardhaman. Driller In-Charge JUNIOR ENGINEER ORD/001637/2024-2025 168/DIC/BMSD(D) 07/03/2025 7 P.K. ENGINEERING 0.95 0.00 0 100
458 PURBA BARDHAMAN Mangolkote Burdwan Division NAYAPARA PIPED WATER SUPPLY SCHEME , SM/16026 New Material Requisition To Resource Division RTOR000036/2023-2024 1962/BWD 25/04/2023 0 Resource Division 0.66 0.00 0 0
459 PURBA BARDHAMAN Mangolkote Burdwan Division NAYAPARA PIPED WATER SUPPLY SCHEME , SM/16026 New Material Requisition To Resource Division RTOR000353/2023-2024 2197/BWD 12/05/2023 0 Resource Division 16.93 0.00 0 0
460 PURBA BARDHAMAN Mangolkote Central Mechanical NAYAPARA PIPED WATER SUPPLY SCHEME , SM/16026 New Supply & Installation of Submersible Pumping Machinery , Voltage Stabilizer, Chlorination system and internal House wiring for Tube well no.- 1 & 2 at NAYAPARA [MANGOLKOTE] Water Supply Scheme under CMD, PHE Dte., Dist.- Purba-Bardhaman. Driller In-Charge Junior Engineer ORD/000892/2023-2024 4155/CMD 29/08/2023 30 P.K. ENGINEERING 21.36 9.69 45.37 46
461 PURBA BARDHAMAN Mangolkote Burdwan Division NAYAPARA PIPED WATER SUPPLY SCHEME , SM/16026 New Material Requisition To Resource Division RTOR000816/2023-2024 297/BWD 24/01/2024 0 Resource Division 14.50 0.00 0 0
462 PURBA BARDHAMAN Mangolkote Central Mechanical NAYAPARA PIPED WATER SUPPLY SCHEME , SM/16026 New NEW SERVICE CONNECTION FOR NAYAPARA PWSS. BILL/02476/2023-2024 BP-2023-24-532 13/02/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 6.03 0.00 0 0
463 PURBA BARDHAMAN Mangolkote Central Mechanical NAYAPARA PIPED WATER SUPPLY SCHEME , SM/16026 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Lakshimpur & others water supply scheme under Mangalkote Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman Driller In-Charge Junior Engineer ORD/000097/2024-2025 2406/CMD 02/08/2024 290 CHOUDHURY ENTERPRISE 57.65 0.00 0 10
464 PURBA BARDHAMAN Mangolkote Burdwan Division NAYAPARA PIPED WATER SUPPLY SCHEME , SM/16026 New Sinking of additional tube well, Construction of pump house, Boundary wall, Land development under NAYAPARA PWSS, Katwa Sub-Division, Block- Mongolkote, Burdwan Division PHE Dte. Assistant Engineer JUNIOR ENGINEER KATWA SUB-DIVISION PHE DTE ORD/001102/2024-2025 456/BWD 21/01/2025 224 HI-LIGHT ELECTRONICS 34.04 0.00 0 20
465 PURBA BARDHAMAN Mangolkote Burdwan Division PURBA NAYAPARA PIPE WATER SUPPLY SCHEME , SM/16477 New Material Requisition To Resource Division RTOR000039/2023-2024 1962/BWD 25/04/2023 0 Resource Division 1.93 0.00 0 0
466 PURBA BARDHAMAN Mangolkote Burdwan Division PURBA NAYAPARA PIPE WATER SUPPLY SCHEME , SM/16477 New Material Requisition To Resource Division RTOR000266/2023-2024 2197/BWD 12/05/2023 0 Resource Division 15.26 0.00 0 0
467 PURBA BARDHAMAN Mangolkote Burdwan Division PURBA NAYAPARA PIPE WATER SUPPLY SCHEME , SM/16477 New Material Requisition To Resource Division RTOR000730/2023-2024 5231/BWD 30/11/2023 0 Resource Division 20.37 0.00 0 0
468 PURBA BARDHAMAN Mangolkote Central Mechanical PURBA NAYAPARA PIPE WATER SUPPLY SCHEME , SM/16477 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at PURBA NAYAPARA Water Supply Scheme [ Block- MANGOLKOTE] under CMD, PHE Dte., Dist.- Purba-Bardhaman. Driller In-Charge Junior Engineer ORD/000874/2023-2024 4137/CMD 29/08/2023 30 P.K. ENGINEERING 29.60 23.31 78.75 88
469 PURBA BARDHAMAN Mangolkote Central Mechanical PURBA NAYAPARA PIPE WATER SUPPLY SCHEME , SM/16477 New New service connection for Purba Nayapara PWSS TW 1. BILL/02911/2023-2024 BP-2023-24-621 07/03/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 4.46 0.00 0 0
470 PURBA BARDHAMAN Mangolkote Central Mechanical PURBA NAYAPARA PIPE WATER SUPPLY SCHEME , SM/16477 New New service connection for Purba Nayapara PWSS TW 2. BILL/02912/2023-2024 BP-2023-24-622 07/03/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 7.56 0.00 0 0
471 PURBA BARDHAMAN Mangolkote Central Mechanical PURBA NAYAPARA PIPE WATER SUPPLY SCHEME , SM/16477 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Lakshimpur & others water supply scheme under Mangalkote Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman Driller In-Charge Junior Engineer ORD/000097/2024-2025 2406/CMD 02/08/2024 290 CHOUDHURY ENTERPRISE 57.65 0.00 0 10
472 PURBA BARDHAMAN Mangolkote Burdwan Division PURBA NAYAPARA PIPE WATER SUPPLY SCHEME , SM/16477 New Different works related (sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of different capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site) to PALISGRAM, PURBA NAYAPARA & SITAHATI Piped Water Supply Scheme under MONGALKOTE Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer JUNIOR ENGINEER KATWA SUB-DIVISION PHE DTE,JUNIOR ENGINEER R.W.S. BURDWAN SUB-DIVISION PHE DTE ORD/000695/2023-2024 4364/BWD 04/10/2023 910 M/S S. CHOUDHURY 1,505.07 100.68 6.69 77
473 PURBA BARDHAMAN Mangolkote Burdwan Division PURBA NAYAPARA PIPE WATER SUPPLY SCHEME , SM/16477 New Different types of works involve in connection with implementation of Aug. Mongalkote, Palishgram, Purba Nowapara, Sitahati, Singhi, Mejhiary & Karui Piped Water Supply Scheme within Katwa Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer ORD/001191/2024-2025 873/BWD 06/03/2025 180 M/S S. CHOUDHURY 588.22 0.00 0 0
474 PURBA BARDHAMAN Mangolkote Burdwan Division BANKAPASI PIPE WATER SUPPLY SCHEME , SM/16484 New Material Requisition To Resource Division RTOR000029/2023-2024 1962/BWD 25/04/2023 0 Resource Division 4.03 0.00 0 0
475 PURBA BARDHAMAN Mangolkote Burdwan Division BANKAPASI PIPE WATER SUPPLY SCHEME , SM/16484 New Material Requisition To Resource Division RTOR000229/2023-2024 2155/BWD 10/05/2023 0 Resource Division 11.91 0.00 0 0
476 PURBA BARDHAMAN Mangolkote Burdwan Division BANKAPASI PIPE WATER SUPPLY SCHEME , SM/16484 New Material Requisition To Resource Division RTOR000559/2023-2024 4892/BWD 10/11/2023 0 Resource Division 27.17 0.00 0 0
477 PURBA BARDHAMAN Mangolkote Central Mechanical BANKAPASI PIPE WATER SUPPLY SCHEME , SM/16484 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Jabagram & others water supply scheme under Mangalkote Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. Driller In-Charge Junior Engineer ORD/000118/2024-2025 2590/CMD 27/08/2024 90 M/S SAJAHAN CHOWDHURY 62.06 0.00 0 0
478 PURBA BARDHAMAN Mangolkote Burdwan Division BANKAPASI PIPE WATER SUPPLY SCHEME , SM/16484 New Continuation Work Order for Supply of 1 (one) No. Inspection Vehicle for different JJM Related Works as and when required including supply of driver and fuels (Minimum 8 Hours of duty) under Katwa Sub-Division within Burdwan Division, P.H.E. Dte. Consider 96.00 Km run per Day Assistant Engineer JUNIOR ENGINEER KATWA SUB-DIVISION PHE DTE ORD/000107/2024-2025 485/KTS 16/04/2024 72 AJIT SAMANTA 0.92 0.23 25 10
479 PURBA BARDHAMAN Mangolkote Central Mechanical BANKAPASI PIPE WATER SUPPLY SCHEME , SM/16484 New NEW SERVICE CONNECTION FOR BANKAPASI PWSS. BILL/02862/2023-2024 BP-2023-24-613 06/03/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 7.89 0.00 0 0
480 PURBA BARDHAMAN Mangolkote Central Mechanical BANKAPASI PIPE WATER SUPPLY SCHEME , SM/16484 New NEW SERVICE CONNECTION FOR BANKAPASI PWSS TW- 2. BILL/02864/2023-2024 BP-2023-24-614 06/03/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 5.23 0.00 0 0
481 PURBA BARDHAMAN Mangolkote Burdwan Division BANKAPASI PIPE WATER SUPPLY SCHEME , SM/16484 New BANKAPASI Piped Water Supply Scheme with sinking of Tube-well, LDS, Rising Main, FHTC, Construction of 350 cum capacity RCC OHR with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drain and internal pathway at different TW site under Mongolkote Block, District:- Purba-Bardhaman [NEW SCHEME]_2ND CALL Assistant Engineer JUNIOR ENGINEER KATWA SUB-DIVISION PHE DTE ORD/000501/2023-2024 3534/BWD 10/08/2023 783 DESTINATION SOLUTIONS & SERVICES PRIVATE LIMITED 490.18 99.57 20.31 20
482 PURBA BARDHAMAN Mangolkote Central Mechanical BANKAPASI PIPE WATER SUPPLY SCHEME , SM/16484 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at BANKAPASI Water Supply Scheme [ Block- MANGOLKOTE] under CMD, PHE Dte., Dist.- Purba-Bardhaman. Driller In-Charge Junior Engineer ORD/000877/2023-2024 4140/CMD 29/08/2023 640 CHOUDHURY ENTERPRISE 28.62 0.00 0 43
483 PURBA BARDHAMAN Ketugram-II Burdwan Division JHAMATPUR PIPED WATER SUPPLY SCHEME , SM/16256 New Material Requisition To Resource Division RTOR000059/2023-2024 1962/BWD 25/04/2023 0 Resource Division 1.42 0.00 0 0
484 PURBA BARDHAMAN Ketugram-II Burdwan Division JHAMATPUR PIPED WATER SUPPLY SCHEME , SM/16256 New Material Requisition To Resource Division RTOR000293/2023-2024 2197/BWD 12/05/2023 0 Resource Division 2.35 0.00 0 0
485 PURBA BARDHAMAN Ketugram-II Burdwan Division JHAMATPUR PIPED WATER SUPPLY SCHEME , SM/16256 New Material Requisition To Resource Division RTOR000594/2023-2024 4902/BWD 10/11/2023 0 Resource Division 10.00 0.00 0 0
486 PURBA BARDHAMAN Ketugram-II Central Mechanical JHAMATPUR PIPED WATER SUPPLY SCHEME , SM/16256 New New service connection charges for Jhamatpur PWSS Tw-1 BILL/00761/2023-2024 BP-2023-24-63 18/07/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.30 0.00 0 0
487 PURBA BARDHAMAN Ketugram-II Burdwan Division JHAMATPUR PIPED WATER SUPPLY SCHEME , SM/16256 New JHAMATPUR Piped Water Supply Scheme with sinking of Tube-well, LDS, Rising Main, FHTC, Construction of 100 cum capacity RCC OHR with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drain and internal pathway at different TW site under KETUGRAM-II Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer JUNIOR ENGINEER R.W.S. BURDWAN SUB-DIVISION PHE DTE ORD/000134/2023-2024 2384/BWD 23/05/2023 300 M/S M.M. ENTERPRISE 228.72 144.88 63.34 80
488 PURBA BARDHAMAN Ketugram-II Central Mechanical JHAMATPUR PIPED WATER SUPPLY SCHEME , SM/16256 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Kankurhati & others water supply scheme under Ketugram-2 Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. Driller In-Charge Junior Engineer ORD/000103/2024-2025 2408/CMD 02/08/2024 90 DIPALI CONSTRUCTION 41.95 0.00 0 0
489 PURBA BARDHAMAN Ketugram-II Central Mechanical JHAMATPUR PIPED WATER SUPPLY SCHEME , SM/16256 New New service connection charges for Jhamatpur PWSS TW-2 BILL/01899/2023-2024 BP-2023-24-369 15/01/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.30 0.00 0 0
490 PURBA BARDHAMAN Ketugram-II Central Mechanical JHAMATPUR PIPED WATER SUPPLY SCHEME , SM/16256 New Supplimentary Quotation for ROW at Jhamatpur PWSS TW-2. BILL/00254/2024-2025 BP-2024-25-132 05/06/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 0.71 0.00 0 0
491 PURBA BARDHAMAN Kalna-II Burdwan Division BIRUHA PIPED WATER SUPPLY SCHEME , SM/16287 New Material Requisition To Resource Division RTOR000070/2023-2024 1962/BWD 25/04/2023 0 Resource Division 12.79 0.00 0 0
492 PURBA BARDHAMAN Kalna-II Burdwan Division BIRUHA PIPED WATER SUPPLY SCHEME , SM/16287 New Material Requisition To Resource Division RTOR000263/2023-2024 2197/BWD 12/05/2023 0 Resource Division 17.53 0.00 0 0
493 PURBA BARDHAMAN Kalna-II Burdwan Division BIRUHA PIPED WATER SUPPLY SCHEME , SM/16287 New Material Requisition To Resource Division RTOR000608/2023-2024 4913/BWD 10/11/2023 0 Resource Division 35.77 0.00 0 0
494 PURBA BARDHAMAN Kalna-II Burdwan Division BIRUHA PIPED WATER SUPPLY SCHEME , SM/16287 New Different works related (sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of different capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site) to AKALPAUSH & BIRUHA Piped Water Supply Scheme under Kalna ¿ II Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000542/2023-2024 3698/BWD 24/08/2023 365 SUPRITI ENTERPRISE 1,010.87 193.93 19.18 37
495 PURBA BARDHAMAN Kalna-II Burdwan Division BIRUHA PIPED WATER SUPPLY SCHEME , SM/16287 New Work Order for "CONSTRUCTION OF TEMPORARY KIOSK FOR THE NECESSARY ARRANGEMENT OF ELECTRIFICATION OF TUBEWELL FOR BIRUHA PWSS UNDER KALNA SUB-DIVISION UNDER BURDWAN DIVISION, PHE DTE." Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/001147/2023-2024 2096/KSD 04/03/2024 10 ER CONSTRUCTION & GENERAL ORDER SUPPLIER 0.66 0.66 100 2
496 PURBA BARDHAMAN Kalna-II Central Mechanical BIRUHA PIPED WATER SUPPLY SCHEME , SM/16287 New New electric connection for Biruha PWSS, PH-1. BILL/01870/2023-2024 BP-2023-24-354 11/01/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 5.00 0.00 0 0
497 PURBA BARDHAMAN Kalna-II Central Mechanical BIRUHA PIPED WATER SUPPLY SCHEME , SM/16287 New New electric connection for Biruha PWSS, PH-2. BILL/01871/2023-2024 BP-2023-24-355 11/01/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 5.94 0.00 0 0
498 PURBA BARDHAMAN Kalna-II Central Mechanical BIRUHA PIPED WATER SUPPLY SCHEME , SM/16287 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at BIRUHA Water Supply Scheme [ Block- KALNA-2] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000896/2023-2024 4159/CMD 29/08/2023 30 J.S. CONSTRUCTION. 28.48 0.00 0 50
499 PURBA BARDHAMAN Kalna-II Central Mechanical BIRUHA PIPED WATER SUPPLY SCHEME , SM/16287 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Khargakur & others water supply scheme under Kalna-2 Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000116/2024-2025 2393/CMD 02/08/2024 280 HANNAN BUILDERS PVT LTD 76.80 0.00 0 20
500 PURBA BARDHAMAN Kalna-II Burdwan Division BIRUHA PIPED WATER SUPPLY SCHEME , SM/16287 New Work order for "Restoration of pipeline with other allied works at different places of Bardalia,Masidpur,Biruha,Mainagari mouja under Birhua Pwss due to construction of rcc cover drain & widening of rcc concrete road constructed by PRI body under Kalna-II panchayat samiti under Kalna Sub-Division under Burdwan Division, PHE Dte." Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000860/2024-2025 1845/KSD 27/11/2024 15 SUPRITI ENTERPRISE 2.89 0.00 0 100
501 PURBA BARDHAMAN Kalna-II Burdwan Division BIRUHA PIPED WATER SUPPLY SCHEME , SM/16287 New Pipeline laying by HDD method and different types of balance works in connection with different Augmentation & New Scheme [(SM/ 08103), (SM/13413), (SM/15587), (SM/16035), (SM/16287), (SM/16029), (SM/15581), (SM/14437), (SM/16028), (SM/16036) & (SM/14425)] within Kalna Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer ORD/001270/2024-2025 849/BWD 05/03/2025 180 S.P. CONSTRUCTION 683.30 0.00 0 0
502 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF KASHIPUR PIPED WATER SUPPLY SCHEME , SM/16297 Augmentation Augmentation of KASHIPUR PWSS to accommodate FHTC, Laying Distribution System, Laying Rising Main, under Jal Jeevan Mission of Purbasthali - II Block, Purba Burdwan District under Burdwan Division, PHE.Dte. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000176/2023-2024 2588/BWD 01/06/2023 60 BAKSHI ENTERPRISE 19.74 13.85 70.16 100
503 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF KASHIPUR PIPED WATER SUPPLY SCHEME , SM/16297 Augmentation Digital structurization of pipeline alignment and asset evaluation including holistic design, preparation of design drawings of overall LDS & preparation of estimate for 09 Nos. Piped W/S. Schemes under Purbasthali II Block under Kalna Sub-Division under Burdwan Division, PHE. Dte. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000338/2024-2025 3018/BWD 05/08/2024 50 HORIZEN 23.70 9.91 41.81 10
504 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF KASHIPUR PIPED WATER SUPPLY SCHEME , SM/16297 Augmentation Work Order for "CONSTRUCTION OF TEMPORARY KIOSK FOR THE NECESSARY ARRANGEMENT OF ELECTRIFICATION OF TUBEWELL FOR KASHIPUR PWSS UNDER KALNA SUB-DIVISION UNDER BURDWAN DIVISION, PHE DTE." Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/001166/2023-2024 2022/KSD 06/03/2024 10 DEL DELTA CONSTRUCTION 0.66 0.66 100 100
505 PURBA BARDHAMAN Central Mechanical AUGMENTATION OF KASHIPUR PIPED WATER SUPPLY SCHEME , SM/16297 Augmentation New service connection charges for Kashipur PWSS TW-1 BILL/01866/2023-2024 BP-2023-24-356 11/01/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.77 0.00 0 0
506 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF KASHIPUR PIPED WATER SUPPLY SCHEME , SM/16297 Augmentation Different types of works involve in connection with Augmentation of JHAUDANGA (SM/16293), KASHIPUR (SM/16297), PATULI (SM/09718) & PARULIA (SM/09719) Piped water supply scheme under Purbasthali-II Block, Kalna Sub-Division, PHE Dte. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000163/2024-2025 2202/BWD 13/06/2024 631 MONDAL PRECISION PVT LTD 570.00 99.42 17.44 2
507 PURBA BARDHAMAN Central Mechanical AUGMENTATION OF BUNDEBAJ PIPED WATER SUPPLY SCHEME , SM/16196 Augmentation Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination system and internal House wiring for Tube well no.- 1 & 2 at Augmentation of BUNDEBAJ[KALNA-II] Water Supply Scheme under CMD, PHE Dte., Dist.- Purba-Bardhaman. ORD/001078/2023-2024 4202/CMD 29/08/2023 30 C.M. ENTERPRISE 24.42 0.00 0 0
508 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF BUNDEBAJ PIPED WATER SUPPLY SCHEME , SM/16196 Augmentation Augmentation of BUNDEBAJ PWSS to accommodate FHTC Laying Distribution System, Laying Rising Main, under Jal Jeevan Mission of Kalna - II Block, Purba Burdwan District under Burdwan Division, PHE. Dte. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000728/2023-2024 4615/BWD 17/10/2023 60 M/S CHANDRANATH MUKHERJEE 39.76 39.59 99.57 100
509 PURBA BARDHAMAN Central Mechanical AUGMENTATION OF BUNDEBAJ PIPED WATER SUPPLY SCHEME , SM/16196 Augmentation Quotation for load enhancement of Bundebaj PWSS TW-2 BILL/00812/2024-2025 BP-2024-25-303 24/09/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 0.51 0.00 0 0
510 PURBA BARDHAMAN Central Mechanical AUGMENTATION OF BUNDEBAJ PIPED WATER SUPPLY SCHEME , SM/16196 Augmentation Quotation for load enhancement of Bundebaj PH-2 BILL/00813/2024-2025 BP-2024-25-304 24/09/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 0.51 0.00 0 0
511 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF BUNDEBAJ PIPED WATER SUPPLY SCHEME , SM/16196 Augmentation Different Types of work involved in connection with Augmentation of 6 Nos. [(SM/07827), (SM/07866), (SM/16196), (SM/18314), (SM/16021), (SM/16019)] Piped Water Supply Scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/001144/2024-2025 618/BWD 11/02/2025 180 M/S DATTA ENTERPRISE 578.09 0.00 0 0
512 PURBA BARDHAMAN Mangolkote Burdwan Division MASARU PIPE WATER SUPPLY SCHEME , SM/16020 New Material Requisition To Resource Division RTOR000341/2023-2024 2197/BWD 12/05/2023 0 Resource Division 13.25 0.00 0 0
513 PURBA BARDHAMAN Mangolkote Burdwan Division MASARU PIPE WATER SUPPLY SCHEME , SM/16020 New Material Requisition To Resource Division RTOR000451/2023-2024 3975/BWD 08/09/2023 0 Resource Division 0.98 0.00 0 0
514 PURBA BARDHAMAN Mangolkote Burdwan Division MASARU PIPE WATER SUPPLY SCHEME , SM/16020 New Material Requisition To Resource Division RTOR000582/2023-2024 4896/BWD 10/11/2023 0 Resource Division 13.36 0.00 0 0
515 PURBA BARDHAMAN Mangolkote Central Mechanical MASARU PIPE WATER SUPPLY SCHEME , SM/16020 New New service connection charges for Mosharu PWSS TW-2 BILL/02194/2023-2024 BP-2023-24-375 16/01/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 4.85 0.00 0 0
516 PURBA BARDHAMAN Mangolkote Central Mechanical MASARU PIPE WATER SUPPLY SCHEME , SM/16020 New New service connection charges for Mosharu PWSS TW-1 BILL/02195/2023-2024 BP-2023-24-374 16/01/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.41 0.00 0 0
517 PURBA BARDHAMAN Mangolkote Burdwan Division MASARU PIPE WATER SUPPLY SCHEME , SM/16020 New MASARU Piped Water Supply Scheme with sinking of Tube-well, LDS, Construction of 100 cum RCC OHR with 20 mtr. staging height including soil testing, Rising Main, FHTC & construction of switch rooms & boundary walls with gates and land development, drain and internal pathway at different TW site under Mangalkote Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer JUNIOR ENGINEER KATWA SUB-DIVISION PHE DTE ORD/000495/2023-2024 3522/BWD 10/08/2023 754 M/S B.N. GUPTA 262.74 182.40 69.42 100
518 PURBA BARDHAMAN Mangolkote Central Mechanical MASARU PIPE WATER SUPPLY SCHEME , SM/16020 New Supply & Installation of Submersible Pumping Machinery , Voltage Stabilizer, Chlorination system and internal House wiring for Tube well no.- 1 & 2 at MASARU [MONGOLKOTE] Water Supply Scheme under CMD, PHE Dte., Dist.- Purba-Bardhaman. Driller In-Charge Junior Engineer ORD/000884/2023-2024 4147/CMD 29/08/2023 640 CHOUDHURY ENTERPRISE 21.27 19.17 90.13 46
519 PURBA BARDHAMAN Mangolkote Central Mechanical MASARU PIPE WATER SUPPLY SCHEME , SM/16020 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Lakshimpur & others water supply scheme under Mangalkote Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman Driller In-Charge Junior Engineer ORD/000097/2024-2025 2406/CMD 02/08/2024 290 CHOUDHURY ENTERPRISE 57.65 0.00 0 10
520 PURBA BARDHAMAN Burdwan Division AUGUMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR KUENTA , SM/15718 Augmentation Pipeline with FHTC for KEUNTA Water Supply Scheme at Kalui village (30 Nos.), Keunta village (30 Nos.), Mandarpur village (30 Nos.), Rampur village (30 Nos.), Nandanpur village (60 Nos.), within Raina-II Block, under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000712/2022-2023 855/BWD 28/02/2023 45 DUBE ENTERPRISE 60.10 10.10 16.81 100
521 PURBA BARDHAMAN Purbasthali-I Burdwan Division NAMA BHANDARITURI PIPED WATER SUPPLY SCHEME , SM/14917 New Material Requisition To Resource Division RTOR000349/2023-2024 2197/BWD 12/05/2023 0 Resource Division 8.77 0.00 0 0
522 PURBA BARDHAMAN Purbasthali-I Burdwan Division NAMA BHANDARITURI PIPED WATER SUPPLY SCHEME , SM/14917 New Material Requisition To Resource Division RTOR000509/2023-2024 4033/BWD 08/09/2023 0 Resource Division 0.33 0.00 0 0
523 PURBA BARDHAMAN Purbasthali-I Central Mechanical NAMA BHANDARITURI PIPED WATER SUPPLY SCHEME , SM/14917 New Supply & Installation of Submersible Pumping Machinery , Voltage Stabilizer, Chlorination system and internal House wiring for Tube well no.- 1 & 2 at NAMA BHANDARITURI Water Supply Scheme [Block - PURBASTHALI-1] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000830/2023-2024 4107/CMD 29/08/2023 30 B.P. TRADING CORPORATION 20.79 13.43 64.6 60
524 PURBA BARDHAMAN Purbasthali-I Burdwan Division NAMA BHANDARITURI PIPED WATER SUPPLY SCHEME , SM/14917 New Material Requisition To Resource Division RTOR000805/2023-2024 304/BWD 24/01/2024 0 Resource Division 3.84 0.00 0 0
525 PURBA BARDHAMAN Purbasthali-I Central Mechanical NAMA BHANDARITURI PIPED WATER SUPPLY SCHEME , SM/14917 New New service connection for Nama Bhandartikuri W/S Scheme. BILL/02190/2023-2024 BP-2023-24-385 16/01/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 4.19 0.00 0 0
526 PURBA BARDHAMAN Purbasthali-I Burdwan Division NAMA BHANDARITURI PIPED WATER SUPPLY SCHEME , SM/14917 New Different works related (sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of different capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site) to NAMA BHANDARITURI, SAHAPUR & MOUDANGA Piped Water Supply Scheme under PURBASTHALI-I Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000511/2023-2024 3689/BWD 23/08/2023 770 THE MAHADEV CONSTRUCTION 734.18 75.99 10.35 50
527 PURBA BARDHAMAN Purbasthali-I Burdwan Division NAMA BHANDARITURI PIPED WATER SUPPLY SCHEME , SM/14917 New Different types of works involve in connection with Augmentation of SAJIARA (SM/09716), NAMA BHANDARTIKURI (SM/14917) Piped water supply scheme under Purbasthali-II Block, Kalna Sub-Division, PHE Dte. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000394/2024-2025 3010/BWD 02/08/2024 240 PRATIMA CONSTRUCTION 79.16 0.00 0 2
528 PURBA BARDHAMAN Purbasthali-I Central Mechanical NAMA BHANDARITURI PIPED WATER SUPPLY SCHEME , SM/14917 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Manganpur & others water supply scheme under Purbasthali 1 Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000714/2024-2025 2979/CMD 25/11/2024 90 H.K. DAS & CO. 53.27 0.00 0 0
529 PURBA BARDHAMAN Manteswar Central Mechanical Detailed Project Report of Ground Water Supply Based Piped Water Supply Scheme For MIRGHAR PWSS in Manteshwar Block of Purab Burdwan District under Burdwan Division, PHE Dte. , SM/18365 New Supply and delivery of Stationary items for the official works related with Mirghar and differents water supply scheme under JJM Programme for Central Mechanical Division and its subordinate offices of P.H.E. Dte. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/001033/2023-2024 702/CMSD 17/08/2023 10 BURDWAN DISTRICT CENTRAL SERVICE CUM MARKETING INDUSTRIAL CO-OPARETIVE UNION LTD 0.74 0.74 100 100
530 PURBA BARDHAMAN Manteswar Burdwan Division Detailed Project Report of Ground Water Supply Based Piped Water Supply Scheme For MIRGHAR PWSS in Manteshwar Block of Purab Burdwan District under Burdwan Division, PHE Dte. , SM/18365 New Material Requisition To Resource Division RTOR000357/2023-2024 2197/BWD 12/05/2023 0 Resource Division 19.80 0.00 0 0
531 PURBA BARDHAMAN Manteswar Burdwan Division Detailed Project Report of Ground Water Supply Based Piped Water Supply Scheme For MIRGHAR PWSS in Manteshwar Block of Purab Burdwan District under Burdwan Division, PHE Dte. , SM/18365 New Material Requisition To Resource Division RTOR000461/2023-2024 3985/BWD 08/09/2023 0 Resource Division 262.83 0.00 0 0
532 PURBA BARDHAMAN Manteswar Central Mechanical Detailed Project Report of Ground Water Supply Based Piped Water Supply Scheme For MIRGHAR PWSS in Manteshwar Block of Purab Burdwan District under Burdwan Division, PHE Dte. , SM/18365 New New service connection charges for Mirghar PWSS TW-2 BILL/01368/2023-2024 BP-2023-24-134 24/08/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 6.42 0.00 0 0
533 PURBA BARDHAMAN Manteswar Central Mechanical Detailed Project Report of Ground Water Supply Based Piped Water Supply Scheme For MIRGHAR PWSS in Manteshwar Block of Purab Burdwan District under Burdwan Division, PHE Dte. , SM/18365 New New service connection charges for Mirghar PWSS TW-3 BILL/01369/2023-2024 BP-2023-24-135 24/08/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.29 0.00 0 0
534 PURBA BARDHAMAN Manteswar Burdwan Division Detailed Project Report of Ground Water Supply Based Piped Water Supply Scheme For MIRGHAR PWSS in Manteshwar Block of Purab Burdwan District under Burdwan Division, PHE Dte. , SM/18365 New MIRGAHAR Piped Water Supply Scheme with sinking of Tube-well, LDS, Rising Main, FHTC, Construction of 700 cum capacity RCC OHR with 20.0 mtr. with Staging height including soil investigation & construction of switch-rooms & boundary walls and land development, drain and internal pathway at different TW site under Monteswar Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000374/2023-2024 3104/BWD 19/07/2023 365 M/S S. CHOUDHURY 929.46 482.99 51.96 60
535 PURBA BARDHAMAN Manteswar Central Mechanical Detailed Project Report of Ground Water Supply Based Piped Water Supply Scheme For MIRGHAR PWSS in Manteshwar Block of Purab Burdwan District under Burdwan Division, PHE Dte. , SM/18365 New continuation order Hiring of Inspection Vehicle (Diesel/CNG/LPG Driven) for supervision of site for the office of Assistant Engineer, under C.M.D. P.H.E. Dte. w.e.f.- 01/01/2024 to 29/02/2024. [Under JJM Works] ASSISTANT ENGINEER Junior Engineer ORD/001636/2023-2024 1240/CMSD 31/12/2023 60 SUBRATA BHADRA 0.79 0.79 100 100
536 PURBA BARDHAMAN Manteswar Central Mechanical Detailed Project Report of Ground Water Supply Based Piped Water Supply Scheme For MIRGHAR PWSS in Manteshwar Block of Purab Burdwan District under Burdwan Division, PHE Dte. , SM/18365 New Supply and installation of Electro-Magnetic flow meter at AURIA, KARUI & others water supply scheme under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. Driller In-Charge JUNIOR ENGINEER ORD/000602/2024-2025 3106/CMD 11/12/2024 60 S.K. ELECTRICALS 13.60 0.00 0 0
537 PURBA BARDHAMAN Manteswar Burdwan Division Detailed Project Report of Ground Water Supply Based Piped Water Supply Scheme For MIRGHAR PWSS in Manteshwar Block of Purab Burdwan District under Burdwan Division, PHE Dte. , SM/18365 New Different types of works in connection with implementation of MIRGAHAR Piped Water Supply Scheme (SM/18365) & BAGPUR PWSS (SM/13323) under Kalna Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000186/2024-2025 2400/BWD 26/06/2024 120 M/S S. CHOUDHURY 301.24 85.64 28.43 60
538 PURBA BARDHAMAN Manteswar Central Mechanical Detailed Project Report of Ground Water Supply Based Piped Water Supply Scheme For MIRGHAR PWSS in Manteshwar Block of Purab Burdwan District under Burdwan Division, PHE Dte. , SM/18365 New NEW SERVICE CONNECTION FOR MIRGHAR PWSS BILL/02591/2023-2024 BP-2023-24-552 20/02/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 7.80 0.00 0 0
539 PURBA BARDHAMAN Manteswar Central Mechanical Detailed Project Report of Ground Water Supply Based Piped Water Supply Scheme For MIRGHAR PWSS in Manteshwar Block of Purab Burdwan District under Burdwan Division, PHE Dte. , SM/18365 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1,2, 3 & 4 at MIRGHAR Water Supply Scheme [ Block- MONTESWAER] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000467/2023-2024 3724/CMD 08/08/2023 30 P.K. ENGINEERING 59.87 36.16 60.4 75
540 PURBA BARDHAMAN Manteswar Central Mechanical Detailed Project Report of Ground Water Supply Based Piped Water Supply Scheme For MIRGHAR PWSS in Manteshwar Block of Purab Burdwan District under Burdwan Division, PHE Dte. , SM/18365 New Supply and installation of Electro-Magnetic flow meter at Bazar Mahammadpur, Dhatrigram, Arjunpukur & others water supply scheme under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000590/2024-2025 3105/CMD 11/12/2024 60 SHREE BISHNU CONSTRUCTION 19.77 0.00 0 0
541 PURBA BARDHAMAN Manteswar Central Mechanical Detailed Project Report of Ground Water Supply Based Piped Water Supply Scheme For MIRGHAR PWSS in Manteshwar Block of Purab Burdwan District under Burdwan Division, PHE Dte. , SM/18365 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Sutra & others water supply scheme under Monteswar Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000068/2024-2025 2396/CMD 02/08/2024 455 SINHA ELECTRICALS 78.06 0.00 0 20
542 PURBA BARDHAMAN Raina-I Burdwan Division SANKARPUR PIPED WATER SUPPLY SCHEME , SM/18337 New Material Requisition To Resource Division RTOR000280/2023-2024 2197/BWD 12/05/2023 0 Resource Division 6.97 0.00 0 0
543 PURBA BARDHAMAN Raina-I Burdwan Division SANKARPUR PIPED WATER SUPPLY SCHEME , SM/18337 New Material Requisition To Resource Division RTOR000427/2023-2024 3858/BWD 01/09/2023 0 Resource Division 2.13 0.00 0 0
544 PURBA BARDHAMAN Raina-I Burdwan Division SANKARPUR PIPED WATER SUPPLY SCHEME , SM/18337 New Material Requisition To Resource Division RTOR000691/2023-2024 5066/BWD 23/11/2023 0 Resource Division 20.46 0.00 0 0
545 PURBA BARDHAMAN Raina-I Central Mechanical SANKARPUR PIPED WATER SUPPLY SCHEME , SM/18337 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at Sankarpur Water Supply Scheme [ Block- Raina-1 ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000723/2023-2024 4034/CMD 29/08/2023 30 GOENKA ENTERPRISE 29.40 23.37 79.49 95
546 PURBA BARDHAMAN Raina-I Central Mechanical SANKARPUR PIPED WATER SUPPLY SCHEME , SM/18337 New New service connection for Shankarpur PWSS TW-1. BILL/02279/2023-2024 BP-2023-24-436 29/01/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.32 0.00 0 0
547 PURBA BARDHAMAN Raina-I Burdwan Division SANKARPUR PIPED WATER SUPPLY SCHEME , SM/18337 New Restoration work of Sankarpur - Nibhuji bazar Road from 13.80 km to 15.75km. damaged due to laying of underground water pipe line by PHE with box cutting and Jhama with moorum consolidation under Kalna Highway sub Division of Burdwan south Highway Division P.W(Roads) Dte . During the year 2023-24 BILL/00644/2024-2025 825/JJM 13/09/2024 0 EXECUTIVE ENGINEER BURDWAN SOUTH HIGHWAY DIVISION P.W. (ROADS) DTE. 3.34 0.00 0 0
548 PURBA BARDHAMAN Raina-I Central Mechanical SANKARPUR PIPED WATER SUPPLY SCHEME , SM/18337 New NEW SERVICE CONNECTION FOR SANKARPUR PWSS TW 2. BILL/03181/2023-2024 BP-2023-24-665 22/03/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.26 0.00 0 0
549 PURBA BARDHAMAN Raina-I Burdwan Division SANKARPUR PIPED WATER SUPPLY SCHEME , SM/18337 New Different works related (sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of different capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site) to BELSHAR & SANKARPUR Piped Water Supply Scheme under Raina ¿ I Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000411/2023-2024 3256/BWD 27/07/2023 1101 SK ALIM 1,345.74 300.65 22.34 85
550 PURBA BARDHAMAN Raina-I Central Mechanical SANKARPUR PIPED WATER SUPPLY SCHEME , SM/18337 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Bajitpur, Belsar & other water supply scheme under Raina-1 Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000117/2024-2025 2589/CMD 27/08/2024 90 DEY ENTERPRISE 74.58 0.00 0 10
551 PURBA BARDHAMAN Raina-I Burdwan Division SANKARPUR PIPED WATER SUPPLY SCHEME , SM/18337 New Balance work [i.e. Extension or parallel Pipeline, Leftout FHTC, Road Restoration work, Sinking of Additional Tube Well with Pump House & Boundary wall, inter Connection of Additional Tube Well, Construction of M.S.Structural bridge, canal Crossing, MS casing with allied work of Bhagabatipur, Machkhara, Udgara, Bantir, Chakpurohit Rasuikhanda, Sankarpur, Gopalpur & Belshar PWSS Block-RAINA- I under Burdwan Sub Division, PHE Dte. within Burdwan Division PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/001103/2024-2025 469/BWD 24/01/2025 366 SK ALIM 1,353.91 0.00 0 25
552 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED TALIT-SIMDAL PWSS TO ACCOMMODATE FHTC IN BURDWAN -I BLOCK UNDER BURDWAN SUB-DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/09566 Augmentation Route Survey & Preparation of DPR for Talit-Simdal W/S Scheme under Burdwan-I Block under Burdwan Sub-Division under Burdwan Division PHE Dte. Sl No.8. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000496/2021-2022 183/BSD 31/01/2022 30 RADIANT 2.96 2.94 99.32 1
553 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED TALIT-SIMDAL PWSS TO ACCOMMODATE FHTC IN BURDWAN -I BLOCK UNDER BURDWAN SUB-DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/09566 Augmentation Supply of materials for different water supply scheme under Burdwan Division, PHE Dte. VCH/001578/2021-2022 1207/DW 10/03/2022 0 EXECUTIVE ENGINEER, RESOURCES DIVISION, P.H.E. DTE. 3,005.00 0.00 0 0
554 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED TALIT-SIMDAL PWSS TO ACCOMMODATE FHTC IN BURDWAN -I BLOCK UNDER BURDWAN SUB-DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/09566 Augmentation Sinking of 300 X 200mm dia Tube Well 150 mtr. Depth by D.R. Rig method using UPVC pipe (CM) and UPVC Medium Well Screen (RMS) for Augmentation of TALIT-SIMDAL & its adjoining mouzas Piped Water Supply Scheme, Block - Burdwan - I, Dist - Purba Bardhaman under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000553/2022-2023 5195/BWD 24/11/2022 30 ANIRUDDHA FARUQUE 11.35 8.83 77.8 0
555 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED TALIT-SIMDAL PWSS TO ACCOMMODATE FHTC IN BURDWAN -I BLOCK UNDER BURDWAN SUB-DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/09566 Augmentation Material Requisition To Resource Division RTOR000232/2021-2022 1556/BWD 15/03/2022 0 Resource Division 0.37 0.00 0 0
556 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED TALIT-SIMDAL PWSS TO ACCOMMODATE FHTC IN BURDWAN -I BLOCK UNDER BURDWAN SUB-DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/09566 Augmentation Material Requisition To Resource Division RTOR000042/2021-2022 538/BWD 27/01/2022 0 Resource Division 20.19 0.00 0 0
557 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED TALIT-SIMDAL PWSS TO ACCOMMODATE FHTC IN BURDWAN -I BLOCK UNDER BURDWAN SUB-DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/09566 Augmentation Material Requisition To Resource Division RTOR000088/2021-2022 880/BWD 11/02/2022 0 Resource Division 9.90 0.00 0 0
558 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED TALIT-SIMDAL PWSS TO ACCOMMODATE FHTC IN BURDWAN -I BLOCK UNDER BURDWAN SUB-DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/09566 Augmentation Augmentation of TALIT-SIMDAL Piped Water Supply Scheme with LDS, Rising Main, Construction of 350 Cum capacity OHR with 20.0 Mtr. Staging height inclusive of soil test, Construction of boundary wall construction at Head work site & FHTC under Burdwan ¿ I Block, District - Purba Bardhaman. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. Junior Engineer, Burdwan Sadar Sub-Division ORD/000004/2022-2023 1876/BWD 05/04/2022 1122 M/S S.S. ENTERPRISE 576.42 434.23 75.33 85
559 PURBA BARDHAMAN Bhatar Burdwan Division SANTOSHPUR PIPED WATER SUPPLY SCHEME , SM/18405 New Material Requisition To Resource Division RTOR000283/2023-2024 2197/BWD 12/05/2023 0 Resource Division 22.79 0.00 0 0
560 PURBA BARDHAMAN Bhatar Burdwan Division SANTOSHPUR PIPED WATER SUPPLY SCHEME , SM/18405 New Material Requisition To Resource Division RTOR000554/2023-2024 4949/BWD 10/11/2023 0 Resource Division 123.19 0.00 0 0
561 PURBA BARDHAMAN Bhatar Central Mechanical SANTOSHPUR PIPED WATER SUPPLY SCHEME , SM/18405 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Karjana & others water supply scheme under Bhatar Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000067/2024-2025 2394/CMD 02/08/2024 90 AHALYA ENGINEERING WORKS 82.00 0.00 0 0
562 PURBA BARDHAMAN Bhatar Central Mechanical SANTOSHPUR PIPED WATER SUPPLY SCHEME , SM/18405 New Quotation for new electric service connection at Santoshpur PH NO.-2 BILL/01741/2023-2024 BP-2023-24-260 07/12/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 2.91 0.00 0 0
563 PURBA BARDHAMAN Bhatar Central Mechanical SANTOSHPUR PIPED WATER SUPPLY SCHEME , SM/18405 New New service connection charges for Santoshpur PWSS TW-1 BILL/01732/2023-2024 BP-2023-24-261 07/12/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 8.42 0.00 0 0
564 PURBA BARDHAMAN Bhatar Burdwan Division SANTOSHPUR PIPED WATER SUPPLY SCHEME , SM/18405 New SANTOSHPUR Piped Water Supply Scheme with sinking of Tube-well, LDS, Rising Main, FHTC, Construction of 600 cum capacity RCC OHR with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drain and internal pathway at different TW site under Bhatar Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer1, Durgapur Sub-Division, PHE Dte.,Junior Engineer2, Durgapur Sub-Division, PHE Dte. ORD/000422/2023-2024 3293/BWD 31/07/2023 365 M/S S. CHOUDHURY 810.21 221.60 27.35 60
565 PURBA BARDHAMAN Bhatar Central Mechanical SANTOSHPUR PIPED WATER SUPPLY SCHEME , SM/18405 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1, 2 & 3 at SANTOSHPUR Water Supply Scheme [ Block- BHATAR ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000783/2023-2024 4076/CMD 29/08/2023 30 SUNRISE ENGINEERING CORPORATION 41.68 0.00 0 60
566 PURBA BARDHAMAN Bhatar Burdwan Division SANTOSHPUR PIPED WATER SUPPLY SCHEME , SM/18405 New Continuation for the work of Supply of Inspection Vehicle for inspection of different JJM related (Schemes) works as and when required including supply of driver & fuel (minimum 8 Hours duty per day) and all taxes etc. for Durgapur Sub-Division under Burdwan Division, P.H.E. Dte.consider 96.00 Km. run per day. [PeriodFebruary.'2025 to April'2025] ORD/001180/2024-2025 129/DSD 29/01/2025 78 MD HASIN 1.00 0.00 0 0
567 PURBA BARDHAMAN Bhatar Burdwan Division SANTOSHPUR PIPED WATER SUPPLY SCHEME , SM/18405 New Continuation for the work of Supply of Inspection Vehicle for inspection of different JJM related (Schemes) works as and when required including supply of driver & fuel (minimum 8 Hours duty per day) and all taxes etc. for Durgapur Sub-Division under BurdwanDivision, P.H.E. Dte.consider 96.00 Km. run per day [Period NOV.'2024 to JAN.'2025] ORD/000847/2024-2025 886/DSD 21/10/2024 78 MD HASIN 1.00 0.33 33 0
568 PURBA BARDHAMAN Bhatar Burdwan Division SANTOSHPUR PIPED WATER SUPPLY SCHEME , SM/18405 New FIXING OF DISPLAY BOARD WITH M.S STRUCTURE CONTAINING SCHEME DESCRIPTION AT NASIGRAM PWSS AND OTHER SCHEMES (16 Nos) WITHIN BHATAR BLOCK UNDER BURDWAN DIVISION , PHE Dte. ORD/001423/2024-2025 311/DSD 21/02/2025 21 SHUBHRA KANTI GHOSH 1.39 0.00 0 0
569 PURBA BARDHAMAN Memari-II Burdwan Division REAN PIPED WATER SUPPLY SCHEME , SM/18504 New Material Requisition To Resource Division RTOR000273/2023-2024 2197/BWD 12/05/2023 0 Resource Division 12.98 0.00 0 0
570 PURBA BARDHAMAN Memari-II Burdwan Division REAN PIPED WATER SUPPLY SCHEME , SM/18504 New Material Requisition To Resource Division RTOR000689/2023-2024 5077/BWD 23/11/2023 0 Resource Division 20.46 0.00 0 0
571 PURBA BARDHAMAN Memari-II Burdwan Division REAN PIPED WATER SUPPLY SCHEME , SM/18504 New Material Requisition To Resource Division RTOR000426/2023-2024 3859/BWD 01/09/2023 0 Resource Division 13.03 0.00 0 0
572 PURBA BARDHAMAN Memari-II Central Mechanical REAN PIPED WATER SUPPLY SCHEME , SM/18504 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System, Internal House Wiring and compound lighting arrangement for Tube well No.- 1 & 2 at REAN Water Supply Scheme [ BLOCK- MEMARI- II] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER Junior Engineer ORD/001602/2023-2024 1532/CMD 05/03/2024 60 SUBRATA BHADRA 28.81 22.88 79.42 70
573 PURBA BARDHAMAN Memari-II Central Mechanical REAN PIPED WATER SUPPLY SCHEME , SM/18504 New New service connection for Rean W/S scheme TW No-1 BILL/02272/2023-2024 BP-2023-24-421 19/01/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 4.00 0.00 0 0
574 PURBA BARDHAMAN Memari-II Central Mechanical REAN PIPED WATER SUPPLY SCHEME , SM/18504 New New service connection at Rean PWSS TW -2 BILL/02329/2023-2024 BP-2023-24-453 30/01/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 6.70 0.00 0 0
575 PURBA BARDHAMAN Memari-II Burdwan Division REAN PIPED WATER SUPPLY SCHEME , SM/18504 New Different works related (sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of different capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site) to BIJUR & REAN Piped Water Supply Scheme under Memari ¿ II Block, District:- Purba-Bardhaman [NEW SCHEME]_2ND CALL Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000481/2023-2024 3495/BWD 09/08/2023 965 NATIONAL CONSTRUCTION 1,175.31 502.05 42.72 85
576 PURBA BARDHAMAN Memari-II Burdwan Division REAN PIPED WATER SUPPLY SCHEME , SM/18504 New Different Types of work involved in connection with different New Schemes (05 Nos.) Piped Water Supply Scheme under Memari II Block within Burdwan Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000003/2025-2026 1116/BWD 03/04/2025 120 SOFIQUL ISLAM 176.89 0.00 0 0
577 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Sahhosenpur Piped Water Supply Scheme at Jamalpur Block , SM/07813 Retrofitting Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of Sahahosenpur Piped Water Supply Scheme at Srikrishnapur Village, Rajarampur Village (2 Nos. habitations), Paikpara Village, Jotdakshin Village & Jotsriram Village, Jamalpur Block under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000646/2020-2021 1690/BWD 24/02/2021 60 DIPAK ROY 70.56 63.87 90.52 1
578 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Sahhosenpur Piped Water Supply Scheme at Jamalpur Block , SM/07813 Retrofitting Construction of boundary wall including land development at 3rd Tube Well site of Sahhosenpur water supply scheme under Jamalpur Block of Burdwan Division, PHE Dte. (Length -58.00 Mtr, Col-21 Nos). GROUP : D Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000083/2022-2023 817/BSD 20/05/2022 45 SARKAR CONSTRUCTION 3.47 0.00 0 1
579 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Sahhosenpur Piped Water Supply Scheme at Jamalpur Block , SM/07813 Retrofitting Extension of pipeline including providing FHTC for SAHHOSENPUR Piped Water Supply Scheme at Jotdakshin (6 Nos), Jotshiram (20 Nos) Habitation for Sajal Gram (As per field verification report duly signed by Pradhan for Har Ghar Jal Certification) within Jamalpur Block under Burdwan Division, PHE Dte. Gr.T. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000356/2022-2023 1341/BSD 02/08/2022 5 ROY BISWAS CONSTRUCTION 0.95 0.00 0 1
580 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Sahhosenpur Piped Water Supply Scheme at Jamalpur Block , SM/07813 Retrofitting Continuation work order for Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Sahahosenpur (Part) village (Sahahosenpur (Part) habitation) of Sahahosenpur Piped Water Supply Scheme within Burdwan Sub-Divn. under Burdwan Division, PHE. Dte. (Part - A) [Sl. No. : ¿17¿] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000539/2020-2021 816/BWD 01/02/2021 15 ROY BISWAS CONSTRUCTION 4.86 4.86 100 1
581 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Sahhosenpur Piped Water Supply Scheme at Jamalpur Block , SM/07813 Retrofitting Extension of pipeline for Sahhosenpur water supply scheme at Sahhosenpur village (Near Masjid) within Jamalpur Block under Burdwan Division, PHE Dte.[Gr.-B] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000281/2021-2022 1212/BSD 09/09/2021 30 ROY BISWAS CONSTRUCTION 4.96 0.00 0 1
582 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Sahhosenpur Piped Water Supply Scheme at Jamalpur Block , SM/07813 Retrofitting Extension of pipeline for Sahhosenpur water supply scheme at Jotsrirram village within Jamalpur Block under Burdwan Division, PHE Dte.[Gr.-C] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000320/2021-2022 1333/BSD 30/09/2021 30 PREMANANDA ROY BISWAS 4.52 0.00 0 1
583 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Sahhosenpur Piped Water Supply Scheme at Jamalpur Block , SM/07813 Retrofitting Pipeline laying at different culvert crossing for damage of PMGSY Road of Sahhosenpur water supply scheme at Jamalpur Block under Burdwan Division, PHE Dte. [Gr.-F] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000552/2021-2022 1481/BSD 09/11/2021 30 ROY BISWAS CONSTRUCTION 3.53 0.00 0 1
584 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Sahhosenpur Piped Water Supply Scheme at Jamalpur Block , SM/07813 Retrofitting Extension of pipeline for Sahhosenpur water supply scheme at Srikrishnapur and Rajarampur village within Jamalpur Block under Burdwan Division, PHE Dte.[Gr.-H] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000553/2021-2022 1483/BSD 09/11/2021 30 DIPAK ROY 4.70 2.70 57.45 1
585 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Sahhosenpur Piped Water Supply Scheme at Jamalpur Block , SM/07813 Retrofitting Extension of pipeline for Sahhosenpur water supply scheme at Jotdakshin village within Jamalpur Block under Burdwan Division, PHE Dte.[Gr.-D] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000555/2021-2022 1524/BSD 18/11/2021 30 THREE MAA ENTERPRISE 4.81 0.00 0 1
586 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Sahhosenpur Piped Water Supply Scheme at Jamalpur Block , SM/07813 Retrofitting Extension of pipeline for Providing FHTC at Srikrishnapur village under SAHAHOSENPUR Piped Water Supply Scheme at Srikrishnapur village within Jamalpur Block , under Burdwan Division, PHE Dte. Group : B Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000089/2022-2023 829/BSD 23/05/2022 30 MMS CONSTRUCTIONS PVT LTD 4.62 4.54 98.27 1
587 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Sahhosenpur Piped Water Supply Scheme at Jamalpur Block , SM/07813 Retrofitting Construction of different slab of damage valve chamber due to widening of PMGSY ROAD and sand filling of PMGSY ROAD of Sahahossenpur water supply scheme under Jamalpur Block of Burdwan Division, PHE Dte. Gr.E. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000092/2022-2023 832/BSD 23/05/2022 30 ROY BISWAS CONSTRUCTION 2.68 0.00 0 1
588 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Sahhosenpur Piped Water Supply Scheme at Jamalpur Block , SM/07813 Retrofitting Laying of interconnection of the Pump No.-1, 2 & 3 with OHR and distribution main of 350 mm dia for Sahhosenpur water supply scheme within Jamalpur Block under Burdwan Division, PHE Dte.[Gr.-C] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000720/2021-2022 1482/BSD 09/11/2021 30 THREE MAA ENTERPRISE 4.83 4.83 100 1
589 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Sahhosenpur Piped Water Supply Scheme at Jamalpur Block , SM/07813 Retrofitting Hire & fuel charges of vehicle Car No.-WB-41G-8280 for the month of January to July'2023. BILL/01042/2023-2024 852/JJM 30/10/2023 0 MD HASIN 2.50 0.00 0 0
590 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Sahhosenpur Piped Water Supply Scheme at Jamalpur Block , SM/07813 Retrofitting Hire & fuel charges of vehicle Car No.-wb-41H-9788 for the month of August'2023 BILL/01037/2023-2024 747/JJM 11/10/2023 0 SK. ASRAFUDDIN 0.40 0.00 0 0
591 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Sahhosenpur Piped Water Supply Scheme at Jamalpur Block , SM/07813 Retrofitting Replace Damaged & deface FHTC(By WBSRDA)with all with accessories within the command area of SAHHOSENPUR Piped W/S Scheme at SahhosenpurSaikh Para and Rajarampur village,Jamalpur Development Block under Burdwan Division,PHE Dte. RWS_JAMALPUR ORD/000156/2024-2025 1045/BSD 10/06/2024 30 SARKAR CONSTRUCTION 0.83 0.81 97.59 100
592 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Sahhosenpur Piped Water Supply Scheme at Jamalpur Block , SM/07813 Retrofitting Vehicle bill for the month of October'2023. BILL/01678/2023-2024 1040/JJM 11/12/2023 0 SK.ASFIA 0.38 0.00 0 0
593 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Sahhosenpur Piped Water Supply Scheme at Jamalpur Block , SM/07813 Retrofitting Vehicle Bill (Car No.-WB-41H-9788) for the month of October'2023. BILL/01677/2023-2024 1033/JJM 11/12/2023 0 SK. ASRAFUDDIN 0.37 0.00 0 0
594 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Sahhosenpur Piped Water Supply Scheme at Jamalpur Block , SM/07813 Retrofitting Vehicle Bill [Car No.-WB-41H-9788] for the month of December'23. BILL/02062/2023-2024 1322/JJM 01/02/2024 0 SK. ASRAFUDDIN 0.40 0.00 0 0
595 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Sahhosenpur Piped Water Supply Scheme at Jamalpur Block , SM/07813 Retrofitting Construction of Boundary wall, Land Development for various PWSS, Block- Jamalpur, District:- Purba-Bardhaman within Burdwan Sub Division under Burdwan Division PHE Dte. AE(HQs),AE(HQs), Burdwan Division, PHE Dte. Junior Engineer, Burdwan Division ORD/001100/2024-2025 433/BWD 20/01/2025 120 RABINDRA NATH GORANG 132.64 0.00 0 40
596 PURBA BARDHAMAN Burdwan Division Rretrofitting wroks for Providing Functional Household Tap Connection (FHTC) within the commend area of Bhatar Piped Water Supply Scheme Block-Bhatar , SM/08033 Retrofitting Supply of materials for different water supply scheme under Burdwan Division, PHE Dte. VCH/001013/2021-2022 21/01/2022 0 EXECUTIVE ENGINEER, RESOURCES DIVISION, P.H.E. DTE. 617.98 0.00 0 0
597 PURBA BARDHAMAN Burdwan Division Rretrofitting wroks for Providing Functional Household Tap Connection (FHTC) within the commend area of Bhatar Piped Water Supply Scheme Block-Bhatar , SM/08033 Retrofitting Payment for supply of materials for different water supply scheme under Burdwan Division, PHE Dte. VCH/001045/2021-2022 934/DW 31/01/2022 0 EXECUTIVE ENGINEER, RESOURCES DIVISION, P.H.E. DTE. 617.98 0.00 0 0
598 PURBA BARDHAMAN Central Drilling Rretrofitting wroks for Providing Functional Household Tap Connection (FHTC) within the commend area of Bhatar Piped Water Supply Scheme Block-Bhatar , SM/08033 Retrofitting Providing drilling crew and other allied works for construction of tube well (300mm x 200mm x 120 mtrs. depth) by utilising Departmental machineries for Bhatar W/S Scheme (Z-II) Bhatar block under Purba bardhaman district, CDD, PHE Dte. Driller In Charge Junior Engineer ORD/000002/2023-2024 64/CDD 06/04/2023 30 C.M. ENTERPRISE 9.91 8.31 83.85 0
599 PURBA BARDHAMAN Burdwan Division Rretrofitting wroks for Providing Functional Household Tap Connection (FHTC) within the commend area of Bhatar Piped Water Supply Scheme Block-Bhatar , SM/08033 Retrofitting Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of Bhatar Piped Water Supply Scheme at Kapshar, Bamsor & Belenda (3nos) Village (Mouza) under Burwan Division, PHE Dte. Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000017/2021-2022 3301/BWD 15/06/2021 60 SUPER CO. OPERATIVE LABOUR CONTRACT AND CONSTRUCTION SOCIETY LTD. 141.14 137.29 97.27 1
600 PURBA BARDHAMAN Burdwan Division Rretrofitting wroks for Providing Functional Household Tap Connection (FHTC) within the commend area of Bhatar Piped Water Supply Scheme Block-Bhatar , SM/08033 Retrofitting Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of Bhatar Piped Water Supply Scheme at Bhatar, Kantar, Kulchanda, Kulnagar, Palar, Satkhali & Chandipur (7nos) Village (Mouza) under Burwan Division, PHE Dte. Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000018/2021-2022 3300/BWD 15/06/2021 60 SUPER CO. OPERATIVE LABOUR CONTRACT AND CONSTRUCTION SOCIETY LTD. 143.17 215.32 150.39 1
601 PURBA BARDHAMAN Burdwan Division Rretrofitting wroks for Providing Functional Household Tap Connection (FHTC) within the commend area of Bhatar Piped Water Supply Scheme Block-Bhatar , SM/08033 Retrofitting Extension of UPVC pipe line of LDS at Bhatar Alinagar for providing FHTC of Bhatar and its adjoining mouzas W/S Scheme (Zone-I) under Durgapur Sub-Division, Burdwan Division, P.H.E. Dte.[Gr.-G] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000292/2021-2022 721/DSD 17/12/2021 30 DHIRENDRANATH SOM 4.69 4.68 99.79 1
602 PURBA BARDHAMAN Burdwan Division Rretrofitting wroks for Providing Functional Household Tap Connection (FHTC) within the commend area of Bhatar Piped Water Supply Scheme Block-Bhatar , SM/08033 Retrofitting Extension of UPVC pipe line of LDS at Vivekanandapally for providing FHTC of Bhatar and its adjoining mouzas W/S Scheme (Zone-I) under Durgapur Sub-Division, Burdwan Division, P.H.E. Dte. [Gr.-F] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000291/2021-2022 720/DSD 17/12/2021 30 DHIRENDRANATH SOM 2.24 2.21 98.66 1
603 PURBA BARDHAMAN Burdwan Division Rretrofitting wroks for Providing Functional Household Tap Connection (FHTC) within the commend area of Bhatar Piped Water Supply Scheme Block-Bhatar , SM/08033 Retrofitting Extension of uPVC pipe line of LDS at Kalpukur Dakshin Para to Palar Lal para for providing FHTC of Bhatar and its adjoining mouzas W/S Scheme (Zone-II) under Durgapur Sub-Division, Burdwan Division, P.H.E. Dte. [Gr.-H] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000293/2021-2022 722/DSD 17/12/2021 30 DHIRENDRANATH SOM 1.99 1.99 100 1
604 PURBA BARDHAMAN Burdwan Division Rretrofitting wroks for Providing Functional Household Tap Connection (FHTC) within the commend area of Bhatar Piped Water Supply Scheme Block-Bhatar , SM/08033 Retrofitting Extension of UPVC pipe line of LDS at Bhatar Maldanga road to Kalpukur Purbapar for providing FHTC of Bhatar and its adjoining mouzas W/S Scheme (Zone-II) under Durgapur Sub-Division, Burdwan Division, P.H.E. Dte. [Gr.-I] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000295/2021-2022 723/DSD 17/12/2021 30 DHIRENDRANATH SOM 4.26 3.70 86.85 1
605 PURBA BARDHAMAN Burdwan Division Rretrofitting wroks for Providing Functional Household Tap Connection (FHTC) within the commend area of Bhatar Piped Water Supply Scheme Block-Bhatar , SM/08033 Retrofitting Sinking of additional 300 X 200mm dia Tube Well 200 mtr. Depth by D.R. Rig method using UPVC pipe (CD) and UPVC Deep Well Screen (RDS) at 1st & 2nd Tubewell Site for Augmentation of BHATAR (Zone-I) Piped Water Supply Scheme, Block - Bhatar, Dist - Purba Bardhaman under Burdwan Division, PHE Dte. [2 Nos. GTW]. Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000059/2022-2023 2240/BWD 02/05/2022 45 AUXILIARY TUBE WELL DRILLERS 28.54 20.72 72.6 1
606 PURBA BARDHAMAN Burdwan Division Rretrofitting wroks for Providing Functional Household Tap Connection (FHTC) within the commend area of Bhatar Piped Water Supply Scheme Block-Bhatar , SM/08033 Retrofitting Retrofitting of RCC Elevated Reservoir (Capacity 300 cum) by shortcreting, Guniting etc. in connection with Augmentation of Bhatar w/s scheme (Zone-I) under Burdwan Division, PHE Dte. Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000963/2020-2021 1793./BWD 26/02/2021 45 LAGNAJITA & CO. 20.57 0.00 0 1
607 PURBA BARDHAMAN Central Mechanical Rretrofitting wroks for Providing Functional Household Tap Connection (FHTC) within the commend area of Bhatar Piped Water Supply Scheme Block-Bhatar , SM/08033 Retrofitting Supply & Installation of Submersible Pumping Machinery , Voltage Stabilizer, Chlorination system and internal House wiring for Tube well no.- 4 at Augmentation of Bhatar (Zone - I) (Bamsor) Water Supply Scheme under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000934/2022-2023 1311/CMD 22/03/2023 30 SRI KRISHNA NIRMAN 11.88 10.93 92 99
608 PURBA BARDHAMAN Burdwan Division Rretrofitting wroks for Providing Functional Household Tap Connection (FHTC) within the commend area of Bhatar Piped Water Supply Scheme Block-Bhatar , SM/08033 Retrofitting Providing Left-Out FHTC to Katari Habitation within Bhatar Zone-II PWSS, within Durgapur (Burdwan North) Sub-Division, PHE Dte, under Burdwan Division, PHE Dte. Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer ORD/000381/2023-2024 556/DSD 20/07/2023 30 BIPLAB SAMANTA 3.98 3.98 100 100
609 PURBA BARDHAMAN Burdwan Division Rretrofitting wroks for Providing Functional Household Tap Connection (FHTC) within the commend area of Bhatar Piped Water Supply Scheme Block-Bhatar , SM/08033 Retrofitting Quotation of Bhatar water supply scheme, Zone-II, PHE Dte. [Quotation No.-5003600235/Quot/03, dt.-10/02/2023] BILL/00375/2022-2023 1168/JJM 10/03/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LTD. 3.37 0.00 0 0
610 PURBA BARDHAMAN Burdwan Division Rretrofitting wroks for Providing Functional Household Tap Connection (FHTC) within the commend area of Bhatar Piped Water Supply Scheme Block-Bhatar , SM/08033 Retrofitting Quotation of new connection charges for Bhatar (Zone-I) water supply scheme. P.H. No.-4 BILL/00132/2022-2023 942/JJM/22-23 09/01/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LTD. 3.67 0.00 0 0
611 PURBA BARDHAMAN Burdwan Division Rretrofitting wroks for Providing Functional Household Tap Connection (FHTC) within the commend area of Bhatar Piped Water Supply Scheme Block-Bhatar , SM/08033 Retrofitting Laying of UPVC pipeline in Bardanga Adibasipara ,Vill-Satkhali within Bhatar Zone-II PWSS within Durgapur (Burdwan North ) Sub Division ,PHE Dte, Under Burdwan Division PHE Dte. JUNIOR ENGINEER DURGAPUR SUB-DIVISION PHE DTE ORD/000934/2024-2025 1074/DSD 10/12/2024 45 BIPLAB SAMANTA 2.53 0.00 0 0
612 PURBA BARDHAMAN Burdwan Division Rretrofitting wroks for Providing Functional Household Tap Connection (FHTC) within the commend area of Bhatar Piped Water Supply Scheme Block-Bhatar , SM/08033 Retrofitting Sinking of 200 mm dia River Bank Tube Well 60 mtr. Depth by D.R. Rig method using UPVC pipe (CM) and UPVC Deep Well Screen (RMS) at Norja village Block -Bhatar, Dist - Purba Bardhaman under Durgapur Sub Division, PHE Dte. [Gr.-C] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000271/2022-2023 496/DSD 12/08/2022 21 DHIRENDRANATH SOM 4.35 4.35 100 100
613 PURBA BARDHAMAN Burdwan Division Rretrofitting wroks for Providing Functional Household Tap Connection (FHTC) within the commend area of Bhatar Piped Water Supply Scheme Block-Bhatar , SM/08033 Retrofitting Extension of UPVC pipe line of LDS at Kapshor village for providing FHTC of Bhatar and its adjoining mouzas W/S Scheme (Zone-I) under Durgapur Sub-Division, Burdwan Division, P.H.E. Dte. [SL-2] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer2, Durgapur Sub-Division, PHE Dte. ORD/000875/2022-2023 728/DSD 30/12/2022 21 DHIRENDRANATH SOM 0.95 0.95 100 100
614 PURBA BARDHAMAN Burdwan Division Rretrofitting wroks for Providing Functional Household Tap Connection (FHTC) within the commend area of Bhatar Piped Water Supply Scheme Block-Bhatar , SM/08033 Retrofitting Extension of UPVC pipe line of LDS at Belenda Purbapara for providing FHTC of Bhatar and its adjoining mouzas W/S Scheme (Zone-II) under Durgapur Sub-Division, Burdwan Division, P.H.E. Dte. [SL-03] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer2, Durgapur Sub-Division, PHE Dte. ORD/000876/2022-2023 729/DSD 30/12/2022 21 DHIRENDRANATH SOM 0.95 0.95 100 100
615 PURBA BARDHAMAN Burdwan Division Rretrofitting wroks for Providing Functional Household Tap Connection (FHTC) within the commend area of Bhatar Piped Water Supply Scheme Block-Bhatar , SM/08033 Retrofitting Extension of UPVC pipe line of LDS at Bamshor and Belenda Purbapara for providing FHTC of Bhatar and its adjoining mouzas W/S Scheme (Zone-II) under Durgapur Sub-Division, Burdwan Division, P.H.E. Dte. [SL-04] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer2, Durgapur Sub-Division, PHE Dte. ORD/000877/2022-2023 730/DSD 30/12/2022 21 DHIRENDRANATH SOM 0.96 0.96 100 100
616 PURBA BARDHAMAN Burdwan Division Rretrofitting wroks for Providing Functional Household Tap Connection (FHTC) within the commend area of Bhatar Piped Water Supply Scheme Block-Bhatar , SM/08033 Retrofitting Extension of UPVC pipe line of LDS at Balsidanga village for providing FHTC of Bhatar and its adjoining mouzas W/S Scheme (Zone-I) under Durgapur Sub-Division, Burdwan Division, P.H.E. Dte. [SL-05] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer2, Durgapur Sub-Division, PHE Dte. ORD/000878/2022-2023 731/DSD 30/12/2022 21 DHIRENDRANATH SOM 0.89 0.89 100 100
617 PURBA BARDHAMAN Burdwan Division Rretrofitting wroks for Providing Functional Household Tap Connection (FHTC) within the commend area of Bhatar Piped Water Supply Scheme Block-Bhatar , SM/08033 Retrofitting Providing Left-Out FHTC to Pallar Habitation within Bhatar Zone-I PWSS, within Durgapur (Burdwan North) Sub-Division, PHE Dte, under Burdwan Division, PHE Dte. Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer ,JUNIOR ENGINEER DURGAPUR SUB-DIVISION PHE DTE ORD/000380/2023-2024 555/DSD 20/07/2023 30 TARAMA AGENCY 4.22 4.22 100 100
618 PURBA BARDHAMAN Burdwan Division Rretrofitting wroks for Providing Functional Household Tap Connection (FHTC) within the commend area of Bhatar Piped Water Supply Scheme Block-Bhatar , SM/08033 Retrofitting Laying of UPVC pipeline in Pallar habitation (Palar Asram Para North side) with Bhatar Zone-I PWSS within Durgapur Sub- Division (Burdwan North) under Burdwan Division PHE Dte. Assistant Engineer, Durgapur Sub Division, P.H.E. Dte JUNIOR ENGINEER DURGAPUR SUB-DIVISION PHE DTE,Junior Engineer2, Durgapur Sub-Division, PHE Dte. ORD/000934/2023-2024 907/DSD 15/12/2023 45 PAPRI HAZRA 0.80 0.77 96.25 100
619 PURBA BARDHAMAN Burdwan Division Rretrofitting wroks for Providing Functional Household Tap Connection (FHTC) within the commend area of Bhatar Piped Water Supply Scheme Block-Bhatar , SM/08033 Retrofitting Laying of UPVC pipeline in Pallar habitation (Palar Asram Para South side) with Bhatar Zone-I PWSS within Durgapur Sub- Division (Burdwan North) under Burdwan Division PHE Dte. Assistant Engineer, Durgapur Sub Division, P.H.E. Dte JUNIOR ENGINEER DURGAPUR SUB-DIVISION PHE DTE,Junior Engineer2, Durgapur Sub-Division, PHE Dte. ORD/000936/2023-2024 908/DSD 15/12/2023 45 TARAMA AGENCY 0.39 0.39 100 100
620 PURBA BARDHAMAN Burdwan Division Rretrofitting wroks for Providing Functional Household Tap Connection (FHTC) within the commend area of Bhatar Piped Water Supply Scheme Block-Bhatar , SM/08033 Retrofitting Providing Left Out FHTC to Sansotosh Sayar Par within Bhatar Zone-II PWSS WITHIN Durgapur (Burdwan North ) Sub Division ,PHE Dte, Under Burdwan Division PHE Dte. Assistant Engineer, Durgapur Sub Division, P.H.E. Dte JUNIOR ENGINEER DURGAPUR SUB-DIVISION PHE DTE ORD/001105/2023-2024 240/DSD 12/03/2024 30 BIPLAB SAMANTA 0.94 0.83 88.3 100
621 PURBA BARDHAMAN Burdwan Division Rretrofitting wroks for Providing Functional Household Tap Connection (FHTC) within the commend area of Bhatar Piped Water Supply Scheme Block-Bhatar , SM/08033 Retrofitting Providing Left Out FHTC to Area Adjacent to Railway Station within Bhatar Zone-II PWSS WITHIN Durgapur (Burdwan North ) Sub Division ,PHE Dte, Under Burdwan Division PHE Dte. Assistant Engineer, Durgapur Sub Division, P.H.E. Dte JUNIOR ENGINEER DURGAPUR SUB-DIVISION PHE DTE ORD/001106/2023-2024 241/DSD 12/03/2024 30 BIPLAB SAMANTA 0.95 0.79 83.16 100
622 PURBA BARDHAMAN Burdwan Division Rretrofitting wroks for Providing Functional Household Tap Connection (FHTC) within the commend area of Bhatar Piped Water Supply Scheme Block-Bhatar , SM/08033 Retrofitting Laying of UPVC pipeline in Katari Habitation within Bhatar Zone- II PWSS WITHIN Durgapur (Burdwan North ) Sub Division ,PHE Dte, Under Burdwan Division PHE Dte. Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer ,JUNIOR ENGINEER DURGAPUR SUB-DIVISION PHE DTE ORD/001104/2023-2024 239/DSD 12/03/2024 30 BIPLAB SAMANTA 0.56 0.52 92.86 100
623 PURBA BARDHAMAN Burdwan Division Rretrofitting wroks for Providing Functional Household Tap Connection (FHTC) within the commend area of Bhatar Piped Water Supply Scheme Block-Bhatar , SM/08033 Retrofitting Providing Left Out FHTC to Ashram Paschimpara within Bhatar Zone-I PWSS WITHIN Durgapur (Burdwan North ) Sub Division ,PHE Dte, Under Burdwan Division PHE Dte. Assistant Engineer, Durgapur Sub Division, P.H.E. Dte JUNIOR ENGINEER DURGAPUR SUB-DIVISION PHE DTE ORD/001165/2023-2024 270/DSD 15/03/2024 30 PAPRI HAZRA 0.92 0.77 83.7 100
624 PURBA BARDHAMAN Burdwan Division Rretrofitting wroks for Providing Functional Household Tap Connection (FHTC) within the commend area of Bhatar Piped Water Supply Scheme Block-Bhatar , SM/08033 Retrofitting Digital structurization of pipeline alignment and asset evaluation including holistic design, preparation of design and drawings of overall LDS for Bhatar Piped Water Supply Scheme Zone I & Zone II under Bhatar Block. Assistant Engineer, Durgapur Sub Division, P.H.E. Dte JUNIOR ENGINEER DURGAPUR SUB-DIVISION PHE DTE ORD/000617/2024-2025 3350/BWD 11/09/2024 15 HORIZEN 5.23 5.23 100 100
625 PURBA BARDHAMAN Burdwan Division Rretrofitting wroks for Providing Functional Household Tap Connection (FHTC) within the commend area of Bhatar Piped Water Supply Scheme Block-Bhatar , SM/08033 Retrofitting Quotation from WBSEDCL for load enhancement of Augmentation of Bhatar Zone-II (Kulnagar) w/s scheme for P.H.-6. BILL/00173/2024-2025 1036/JJM 25/10/2024 0 WBSEDCL 3.57 0.00 0 0
626 PURBA BARDHAMAN Burdwan Division Rretrofitting wroks for Providing Functional Household Tap Connection (FHTC) within the commend area of Bhatar Piped Water Supply Scheme Block-Bhatar , SM/08033 Retrofitting Quotation of new service connection charges of Aug. of Bhatar (Zone-II) TW-6 water supply scheme under Burdwan Division, PHE Dte. BILL/01338/2023-2024 1275/JJM 18/01/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LTD. 9.53 0.00 0 0
627 PURBA BARDHAMAN Burdwan Division Rretrofitting wroks for Providing Functional Household Tap Connection (FHTC) within the commend area of Bhatar Piped Water Supply Scheme Block-Bhatar , SM/08033 Retrofitting Land demarcation and preparation of sketch map including legal charges for different PWSS under JJM of Bhatar Block under Duragapur (Burdwan North) Sub-Division, P.H.E. DTE. [Part-A] ORD/001509/2024-2025 157/DSD 27/01/2025 180 SHUBHRA KANTI GHOSH 0.81 0.00 0 70
628 PURBA BARDHAMAN Burdwan Division Rretrofitting wroks for Providing Functional Household Tap Connection (FHTC) within the commend area of Bhatar Piped Water Supply Scheme Block-Bhatar , SM/08033 Retrofitting Mutation of Departmental Land use in various PWSS (Existing & New) under JJM of Bhatar, Khandaghosh and Manteswar Block under Duragapur (Burdwan North) Sub-Division, P.H.E. DTE. Junior Engineer1, Durgapur Sub-Division, PHE Dte. ORD/000237/2025-2026 661/DSD 30/04/2025 365 SHUBHRA KANTI GHOSH 0.47 0.00 0 70
629 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Amra Piped Water Supply Scheme , SM/06969 Retrofitting Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Dogachia village of Amra piped water supply scheme within Burdwan Sub-Division under Burdwan Division, PHE Dte. [Phase-I](Tr No.-232/BWD/2020-21) ORD/000093/2020-2021 2737/BWD 10/08/2020 30 KALYAN CHOWDHURY 4.92 9.84 200 1
630 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Amra Piped Water Supply Scheme , SM/06969 Retrofitting Continuation work order for Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Amra village of Amra piped water supply scheme within Burdwan Sub-Division under Burdwan Division, PHE Dte. [Phase-I](Tr No.-404/BWD/2020-21) Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. Junior Engineer, R.W.S. Burdwan Sub Division, P.H.E. Dt ORD/000092/2020-2021 3531/BWD 25/09/2020 30 DEBASHISH ENTERPRISE 4.92 9.84 200 1
631 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Amra Piped Water Supply Scheme , SM/06969 Retrofitting Continuation work order for Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Teli Nuri village of Amra piped water supply scheme within Burdwan Sub-Division under Burdwan Division, PHE Dte. [Phase-I](Tr No.-427/BWD/2020-21) Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. Junior Engineer, R.W.S. Burdwan Sub Division, P.H.E. Dt ORD/000085/2020-2021 3530/BWD 25/09/2020 30 KALYAN CHOWDHURY 4.92 9.84 200 1
632 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Amra Piped Water Supply Scheme , SM/06969 Retrofitting Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Amra village of Amra piped water supply scheme within Burdwan Sub-Division under Burdwan Division, PHE Dte. [Phase-I](Tr No.-208/BWD/2020-21) ORD/000083/2020-2021 2734/BWD 10/08/2020 30 DEBASHISH ENTERPRISE 4.92 9.84 200 1
633 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Amra Piped Water Supply Scheme , SM/06969 Retrofitting Supply of SS316 grade flow control valve for FHTC at different water supply schemes within Kalna Sub-Division under Burdwan Division, PHE Dte. and delivered at Barsul Divisional store.[Part-2] Assistant Engineer ORD/001307/2020-2021 1792 /BWD 26/02/2021 10 INDIA PIPE FITTING CO 9.70 1.11 11.44 1
634 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Amra Piped Water Supply Scheme , SM/06969 Retrofitting Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of Amra Piped Water Supply Scheme at Amra (2 Nos Habitation Part) & Dogachia Village (Mouza), Jamalpur Block under Burdwan Division, PHE Dte._3rd CALL. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000008/2021-2022 3138/BWD 03/06/2021 45 D.M. ENTERPRISE 57.42 41.54 72.34 1
635 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Amra Piped Water Supply Scheme , SM/06969 Retrofitting Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of AMRA Piped Water Supply Scheme (Vill-Dogechia, Habitation- Dogechia ) at Jamalpur Block of Burdwan Sub-Division under Burdwan Division, PHE Dte.Gr.A. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000386/2021-2022 57/BSD 13/01/2022 30 DEY NIRMAN 4.81 4.78 99.38 1
636 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Amra Piped Water Supply Scheme , SM/06969 Retrofitting Extension of pipeline at AMRA water supply scheme at different villages (Tengaberia, Badpur & Kolupukur) FHTC of Jamalpur Block under Burdwan Division, PHE Dte.[Gr.-F] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000561/2021-2022 1374/BSD 05/10/2021 30 D.M. ENTERPRISE 4.74 0.00 0 1
637 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Amra Piped Water Supply Scheme , SM/06969 Retrofitting Construction of Boundary wall at 3rd Tube well site of Dogachia Mouza of Amra water supply scheme under Jamalpur block under Burdwan Division, PHE Dte. [Length-59 Mtr][Gr.-F] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000557/2021-2022 1028/BSD 05/08/2021 45 MUKHERJEE ENTERPRISE 4.45 0.00 0 1
638 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Amra Piped Water Supply Scheme , SM/06969 Retrofitting Providing FHTC for Dogachia Mouza [(Habitation (Village)] for AMRA piped W/S Scheme, Jamalpur Dev. Block under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000068/2023-2024 2019/BWD 28/04/2023 30 DEY NIRMAN 20.61 10.40 50.46 100
639 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Amra Piped Water Supply Scheme , SM/06969 Retrofitting Continuation work order for Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Jougram village (Jougram habitation) of Jougram Piped Water Supply Scheme within Burdwan Sub-Divn. under Burdwan Division, PHE. Dte. (Part-C) [SL. No. : 11] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000031/2021-2022 3408/BWD 25/06/2021 15 N.S. ENTERPRISE 4.86 8.53 175.51 1
640 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Amra Piped Water Supply Scheme , SM/06969 Retrofitting Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Dattapur village (Adampur habitation) of Jougram Piped Water Supply Scheme within Burdwan Sub-Divn. under Burdwan Division, PHE. Dte. [SL. No. : 11] ORD/000428/2020-2021 590/BWD 25/01/2021 15 N.S. ENTERPRISE 4.86 6.59 135.6 0
641 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Amra Piped Water Supply Scheme , SM/06969 Retrofitting Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Jougram village (Jougram habitation) of Jougram Piped Water Supply Scheme within Burdwan Sub-Divn. under Burdwan Division, PHE. Dte. (Part-B) [SL. No. : 13] ORD/000427/2020-2021 592/BWD 25/01/2021 15 DEY NIRMAN 4.84 9.68 200 0
642 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Amra Piped Water Supply Scheme , SM/06969 Retrofitting Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Jougram village (Jougram habitation) of Jougram Piped Water Supply Scheme within Burdwan Sub-Divn. under Burdwan Division, PHE. Dte. (Part-A) [SL. No. : 12] (Agreement No. 671/BWD of 2020-21) ORD/000429/2020-2021 591/BWD 25/01/2021 15 MUKHERJEE ENTERPRISE 4.86 9.72 200 0
643 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Amra Piped Water Supply Scheme , SM/06969 Retrofitting Continuation work order for Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Jougram village (Jougram habitation) of Jougram Piped Water Supply Scheme within Burdwan Sub-Divn. under Burdwan Division, PHE. Dte. (Part-A) [SL. No. : 12] (Agreement no. 839/BWD of 2020-21) ORD/000430/2020-2021 1397/BWD 15/02/2021 15 MUKHERJEE ENTERPRISE 4.86 9.72 200 0
644 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Amra Piped Water Supply Scheme , SM/06969 Retrofitting Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Jajanpur village and Jajanpur-Tangaberia habitation of JAUGRAM piped water supply scheme within Burdwan Sub-Division under Burdwan Division, PHE Dte.[Phase-I][Gr.-6B] ORD/000740/2020-2021 3331/BWD 18/09/2020 30 DEY NIRMAN 4.86 9.73 200.21 0
645 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting at Mugura PWSS , SM/06747 Retrofitting Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Mugura village of Mugura piped water supply scheme within Headquarters under Burdwan Division, PHE Dte. [Phase-I](Tr No.-163/BWD/2020-21) Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000088/2020-2021 2690/BWD 07/08/2020 30 LAKSHMIKANTA DAS 4.92 9.84 200 1
646 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting at Mugura PWSS , SM/06747 Retrofitting Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Jagarpur & Mugura village of Mugura piped water supply scheme within Headquarters under Burdwan Division, PHE Dte. [Phase-I](Tr No.-238/BWD/2020-21) Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000095/2020-2021 2689/BWD 07/08/2020 30 HAFIJUR RAHAMAN MIDYA 4.92 9.84 200 1
647 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting at Mugura PWSS , SM/06747 Retrofitting Continuation work order for Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Mugura village of Mugura Piped Water Supply Scheme within Headquarters under Burdwan Division, PHE. Dte. [Phase - I] [GROUP : ¿3A¿] (Agreement no. 163/BWD,2020-2021) Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000135/2020-2021 3535/BWD 25/09/2020 30 LAKSHMIKANTA DAS 2.69 0.00 0 1
648 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting at Mugura PWSS , SM/06747 Retrofitting Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Jagarpur & Mugura village of Mugura Piped Water Supply Scheme within Headquarters under Burdwan Division, PHE. Dte. [Phase - I] [GROUP : ¿3B¿] (Agreement no.238/BWD of 2020-21) Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000136/2020-2021 4118/BWD 16/10/2020 30 HAFIJUR RAHAMAN MIDYA 4.92 0.00 0 1
649 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting at Mugura PWSS , SM/06747 Retrofitting Laying Parallel Pipeline to improve drinking water supply, Construction of Boundary wall, Path Way, Drain at Head Work Site & 2nd TW Site and providing leftout FHTC, Road Restoration with allied work for MUGRA Piped Water Supply Scheme, Block- Raina-I, within Burdwan Sub Division under Burdwan Division PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000279/2024-2025 2711/BWD 11/07/2024 2720 M/S PURBASHA 40.24 0.00 0 90
650 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting at Sultanpur PWSS , SM/06748 Retrofitting Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Sultanpur village of Sultanpur piped water supply scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. [Phase-I](Tr No.-373/BWD/2020-21) ORD/000084/2020-2021 2602/BWD 04/08/2020 30 INVENT ENGINEERS CO. OPERATIVE SOCIETY LTD. 4.91 9.83 200.2 1
651 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting at Sultanpur PWSS , SM/06748 Retrofitting Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Gopalpur village of Sultanpur piped water supply scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. [Phase-I](Tr No.-338/BWD/2020-21) ORD/000087/2020-2021 2609/BWD 04/08/2020 30 BISWAS ENTERPRISE 4.91 9.82 200 1
652 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting at Sultanpur PWSS , SM/06748 Retrofitting Continuation work order for Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Gopalpur village of Sultanpur piped water supply scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. [Phase-I](Tr No.-339/BWD/2020-21) AE(HQs) J.E. 2 BURDWAN ORD/000356/2020-2021 3700/BWD 05/10/2020 30 BISWAS ENTERPRISE 4.91 9.82 200 1
653 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting at Sultanpur PWSS , SM/06748 Retrofitting Continuation work order for Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Sultanpur village of Sultanpur piped water supply scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. [Phase-I](Tr No.-374/BWD/2020-21) Assistant Engineer Junior Engineer, R.W.S. Burdwan Sub Division, P.H.E. Dt ORD/000116/2020-2021 3701/BWD 05/10/2020 30 INVENT ENGINEERS CO. OPERATIVE SOCIETY LTD. 4.19 8.38 200 1
654 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting at Sultanpur PWSS , SM/06748 Retrofitting Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of Sultanpur Piped Water Supply Scheme at Halbele, Hridaypur, Isabpur, Nowapara & Uplati Village (Mouza), Kalna ¿ I Block under Burdwan Division, PHE Dte.(Agreement No. 56/2020-2021 OF SE/CC/PHE. DTE.) Assistant Engineer ORD/000124/2020-2021 4901/BWD 07/12/2020 90 MAJILA ENTERPRISE 94.67 151.02 159.52 1
655 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting at Sultanpur PWSS , SM/06748 Retrofitting Supply of 10 mm NB Gun-metal Ferrule conforming to IS: 2692-1989 for Water tap connection in each house hold from existing distribution system within Scheme jurisdiction in different Piped Water Supply Scheme within Kalna Sub-Division under Burdwan Division, PHE. Dte. and delivered at Borsul Divl. Store. [Part-5]. AE(HQs) J.E. 2 BURDWAN ORD/000090/2021-2022 3590/BWD 13/07/2021 30 PREMANANDA ROY BISWAS 127.50 0.48 0.38 1
656 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting at Sultanpur PWSS , SM/06748 Retrofitting Protection work of distribution system (200 mm dia) of 35 Mtr length near the head work site (Right Side) of Sultanpur & its adjoining mouzas water supply scheme by UC Bullah including Drum Sheet within Kalna Sub-Division under Burdwan Division, PHE Dte.[Gr.-E] Assistant Engineer ORD/000845/2020-2021 20/KSD 07/01/2021 30 DEBASHISH ENTERPRISE 0.75 0.00 0 1
657 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting at Sultanpur PWSS , SM/06748 Retrofitting Providing FHTC in each household from dist. System within Scheme jurisdiction in Hridaypur, Upalati, Belerhat, Gopalpur, Sultanpur, Isabpur & Naopara Village of SULTANPUR W/S. Scheme under Burdwan Division, PHE Dte. Assistant Engineer ORD/000584/2021-2022 1357/BWD 09/03/2022 30 TAPAS KUMAR ROY 16.69 0.00 0 1
658 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting at Anguna PWSS , SM/06752 Retrofitting Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Anguna village of Anguna Piped Water Supply Scheme within Headquarters under Burdwan Division, PHE. Dte. [Phase - I] [GROUP : ¿1A¿] ORD/000133/2020-2021 2694/BWD 10/07/2020 30 ANWESHA CONSTRUCTION 4.91 0.00 0 1
659 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting at Anguna PWSS , SM/06752 Retrofitting Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Anguna village of Anguna Piped Water Supply Scheme within Headquarters under Burdwan Division, PHE. Dte. [Phase - I] [GROUP : ¿1A¿] (Agreement no. 171/BWD of 2020-21) ORD/000134/2020-2021 2698/BWD 07/08/2020 30 ANWESHA CONSTRUCTION 4.91 0.00 0 1
660 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting at Anguna PWSS , SM/06752 Retrofitting Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Anguna village of Anguna piped water supply scheme within Headquarters under Burdwan Division, PHE Dte. [Phase-I](Tr No.-171/BWD/2020-21) ORD/000097/2020-2021 2684/BWD 07/08/2020 30 ANWESHA CONSTRUCTION 4.91 9.82 200 1
661 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting at Anguna PWSS , SM/06752 Retrofitting Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Gunar village of Anguna piped water supply scheme within Headquarters under Burdwan Division, PHE Dte. [Phase-I](Tr No.-203/BWD/2020-21) ORD/000096/2020-2021 2693/BWD 07/08/2020 30 M/S ANAND CONSTRUCTION 4.92 9.84 200 1
662 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting at Anguna PWSS , SM/06752 Retrofitting Continuation work order for Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Anguna village of Anguna piped water supply scheme within Headquarters under Burdwan Division, PHE Dte. [Phase-I](Tr No.-302/BWD/2020-21) Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000090/2020-2021 3355/BWD 21/09/2020 30 ANWESHA CONSTRUCTION 4.59 9.18 200 1
663 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting at Anguna PWSS , SM/06752 Retrofitting Continuation work order for Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Gunar village of Anguna piped water supply scheme within Headquarters under Burdwan Division, PHE Dte. [Phase-I](Tr No.-369/BWD/2020-21) Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000101/2020-2021 3515/BWD 25/09/2020 30 M/S ANAND CONSTRUCTION 2.17 4.34 200 1
664 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting at Anguna PWSS , SM/06752 Retrofitting Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of Anguna Piped Water Supply Scheme at Anguna (Part), Gunar (Part) & Sakita Village (Mouza), Raina-I Block under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000291/2020-2021 517/BWD 21/01/2021 45 SK ALIM 33.40 46.82 140.18 1
665 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting at Anguna PWSS , SM/06752 Retrofitting Extension of pipe line of existing distribution system within the command area of Anguna Piped Water Supply Scheme, Anguna village within Raina-1 Block of Burdwan Sub Division under Burdwan Division,PHE Dte".Gr.A. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000439/2022-2023 1465/BSD 25/08/2022 45 ANWESHA CONSTRUCTION 4.97 4.93 99.2 1
666 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting at Anguna PWSS , SM/06752 Retrofitting Supply of materials for different water supply scheme under Burdwan Division, PHE Dte. VCH/001237/2021-2022 1132/DW 26/02/2022 0 EXECUTIVE ENGINEER, RESOURCES DIVISION, P.H.E. DTE. 221.00 0.00 0 0
667 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting at Anguna PWSS , SM/06752 Retrofitting Providing leftout water tap connection in different villages for 100% coverage to make it Sajal Gram from existing distribution system within scheme jurisdiction of different Piped Water Supply Schemes within Raina ¿ I Block under Burdwan Division, PHE. Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000344/2021-2022 39/BWD 05/01/2022 30 HAFIJUR RAHAMAN MIDYA 15.62 0.00 0 1
668 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting at Anguna PWSS , SM/06752 Retrofitting Extension of pipeline of Anguna water supply scheme at Anguna, Sanktia and Gunar village within Raina-I Block under Burdwan division, PHE Dte.[Gr.-A] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000711/2021-2022 1480/BSD 09/11/2021 30 SK ABDUL HALIM 4.44 4.35 97.97 1
669 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting at Anguna PWSS , SM/06752 Retrofitting Extension of pipeline for Anguna water supply scheme at Anguna, Sanktia and Gunar village within Raina-I Block under Burdwan Division, PHE Dte.[Gr.-B] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000715/2021-2022 1429/BSD 28/10/2021 30 SK ABDUL HALIM 4.38 3.11 71 1
670 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting at Anguna PWSS , SM/06752 Retrofitting Material Requisition To Resource Division RTOR000123/2021-2022 1108/BWD 26/02/2022 0 Resource Division 25.78 0.00 0 0
671 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting at Anguna PWSS , SM/06752 Retrofitting Hire & fuel charges of vehicle (Car No.-WB-41H-9788) for the office of the Assistant Engineer, Head Quarters, Burdwan Division, PHE Dte. for the month of March'23. BILL/00296/2023-2024 201/JJM 01/06/2023 0 SK. ASRAFUDDIN 0.39 0.00 0 0
672 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting at Anguna PWSS , SM/06752 Retrofitting Vehicle bill for the office of the Assistant Engineer, Head Quarters Burdwan Division, PHE Dte. for the month of June'23. BILL/00616/2023-2024 482/JJM 09/08/2023 0 SK. ASRAFUDDIN 0.40 0.00 0 0
673 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting at Anguna PWSS , SM/06752 Retrofitting Extension Pipeline with Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of Anguna, Sanktia, Gunar village of ANGUNA Piped Water Supply Scheme within Raina I Block of Burdwan Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000811/2022-2023 1575/BWD 31/03/2023 60 JAGADANANDAPUR CO. OP. LABOUR CONTRACT AND CONSTRUCTION SOCIETY LTD. 33.16 0.00 0 100
674 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting at Anguna PWSS , SM/06752 Retrofitting Vehicle bill for the month of november'2023. BILL/01673/2023-2024 1140/JJM 29/12/2023 0 SK. ASRAFUDDIN 0.40 0.00 0 0
675 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting at Anguna PWSS , SM/06752 Retrofitting MAINTENANCE OF ROAD (WHISH IS DAMAGED FOR LAYING PIPELINE BY PHE DEPTT) NAMELY NARUGRAM H.C TO BADSHI ROAD VIDE- PACKAGE NO- WB 22 12 UNDER PMGSY-III UNDER NARUGRAM GP. & RAINA-I BLOCK, IN PURBA BARDHAMAN DISTRICT BILL/00740/2024-2025 894/JJM 25/09/2024 0 EXECUTIVE ENGINEER (WBSRDA) PURBA BARDHAMAN DIVISION 3.86 0.00 0 0
676 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting at Anguna PWSS , SM/06752 Retrofitting Vehicle bill for the month of October & November'2023. BILL/01671/2023-2024 1145/JJM 29/12/2023 0 SOURAV JANA 0.79 0.00 0 0
677 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting at Anguna PWSS , SM/06752 Retrofitting Vehicle bill for the month of november'2023. BILL/01672/2023-2024 1141/JJM 29/12/2023 0 SK.ASFIA 0.40 0.00 0 0
678 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) under the command area of Dharma Danga Piped Water Supply Scheme , SM/07545 Retrofitting Continuation order for water tap connection in each house hold from existing distribution system within scheme jurisdiction in Rameswarpur village and Rameswarpur habitation of Dharmadanga piped water supply scheme within Kalna Sub-Division under Burdwan Division, PHE Dte.[Phase-I][Group-1B] Assistant Engineer ORD/000732/2020-2021 4743/BWD 01/12/2020 30 TAPAS KUMAR ROY 3.20 0.00 0 1
679 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) under the command area of Dharma Danga Piped Water Supply Scheme , SM/07545 Retrofitting Water tap connection in each household from existing distribution system within scheme jurisdiction in Koldanga-Mirpur village (35 Nos) & Rameswarpur village (50 Nos) (Total-85 Nos) of Dharmadanga water supply scheme within Kalna Sub-Division under Burdwan Division, PHE Dte.[SL NO.-C] Assistant Engineer ORD/000321/2021-2022 1026/KSD 01/10/2021 15 SETH ENTERPRISE 2.95 2.95 100 1
680 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) under the command area of Dharma Danga Piped Water Supply Scheme , SM/07545 Retrofitting Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of Dharmadanga Piped Water Supply Scheme at Dharmadanga (P) Village (Mouza), Kalna-I Block under Burdwan Division, PHE Dte. Assistant Engineer ORD/000255/2021-2022 6641/BWD 29/11/2021 30 INVENT ENGINEERS CO. OPERATIVE SOCIETY LTD. 14.94 15.39 103.01 1
681 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) under the command area of Dharma Danga Piped Water Supply Scheme , SM/07545 Retrofitting Extension of different dia UPVC pipeline at Rameswarpur village of Dharmadanga water supply scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. [Sl No.-A] Assistant Engineer ORD/000829/2020-2021 167/KSD 19/02/2021 30 BISHWAJIT DAS 3.97 0.00 0 1
682 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) under the command area of Dharma Danga Piped Water Supply Scheme , SM/07545 Retrofitting Continuation work order for Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Madhuban village of Dharmadanga Piped Water Supply Scheme within Kalna Sub-Divn. under Burdwan Division, PHE. Dte. [Phase - I] [Sl.No : 6B] Assistant Engineer ORD/000972/2020-2021 4745/BWD 01/12/2020 30 KHEPIMA ENGINEERS CO. OPERATIVE SOCIETY LTD. 2.66 2.66 100 1
683 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) under the command area of Dharma Danga Piped Water Supply Scheme , SM/07545 Retrofitting Work order for "Providing Functional house hold tap connections for Sajal Gram Village within Kalna-I Block under Kalna Sub-Division under Burdwan Division, PHE Dte. (Dharmadanga Water Supply Scheme) Sl No- 5 Assistant Engineer Junior Engineer, R.W.S. Burdwan Sub Division, P.H.E. Dt ORD/000689/2022-2023 101/KSD 08/02/2023 28 BUILD-TECH 0.88 0.88 100 100
684 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) under the command area of Dharma Danga Piped Water Supply Scheme , SM/07545 Retrofitting Hire & fuel charges of vehicle (Car No.-WB-04G-6018) for the office of the Assistant Engineer, Katwa Sub-Division, PHE Dte. for the month of March'23. BILL/00290/2023-2024 204/JJM 01/06/2023 0 M/S MUNMUN DEY 0.28 0.00 0 0
685 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) under the command area of Dharma Danga Piped Water Supply Scheme , SM/07545 Retrofitting Work Order for "Laying distribution system including providing FHTC in the leftout portion of Dharmadanga (SM/07545) water supply scheme under Kalna Sub-Division under Burdwan Division, PHE Dte.". Assistant Engineer Junior Engineer, R.W.S. Burdwan Sub Division, P.H.E. Dt ORD/000953/2024-2025 1921/KSD 02/12/2024 30 H SAMANTA 2.02 0.00 0 0
686 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) under the command area of Dharma Danga Piped Water Supply Scheme , SM/07545 Retrofitting Work Order for "Providing Functional house hold tap connections within command ares of Dharmadanga water supply scheme within Kalna-I Block under Kalna Sub-Division under Burdwan Division, PHE Dte." Assistant Engineer Junior Engineer, R.W.S. Burdwan Sub Division, P.H.E. Dt ORD/000550/2023-2024 1305/KSD 23/08/2023 15 BISWAS ENTERPRISE 2.81 1.81 64.41 100
687 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) under the command area of Dharma Danga Piped Water Supply Scheme , SM/07545 Retrofitting Designing, Making and Erection of Sign Board for SAJAL GRAM in Rameswarpur (P) Village, Kalna - I Block within Dharma Danga PWSS under Burdwan Division, PHE Dte. (5 Nos Board) AE(HQs) J.E. 1 BURDWAN ORD/000741/2023-2024 836/AE/HQ 31/10/2023 30 MUNSHI JAVEDUR JAMAN 0.76 0.72 94.74 100
688 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) under the command area of Dharma Danga Piped Water Supply Scheme , SM/07545 Retrofitting Designing, Making and Erection of Sign Board for SAJAL GRAM in Madhuban (P) Village, Kalna - I Block within Dharma Danga PWSS under Burdwan Division, PHE Dte. (5 Nos Board) AE(HQs) J.E. 1 BURDWAN ORD/000794/2023-2024 873/AE/HQ 07/11/2023 30 PAPRI HAZRA 0.76 0.72 94.74 100
689 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) under the command area of Dharma Danga Piped Water Supply Scheme , SM/07545 Retrofitting Rest portion of OHR work (Plastering, Priming & Painting and interconnection of Rising Main with Specials) & Construction of Boundary wall with Smriti Saudha at Aug. of DHARMADANGA Water Supply Scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. (Length - 81.01 Mtr, No of Columns=28 Nos. Centre to Centre- 3.0 Mtr.). Assistant Engineer Junior Engineer, R.W.S. Burdwan Sub Division, P.H.E. Dt ORD/000995/2023-2024 267/BWD 15/01/2024 60 S.K. CONSTRUCTION 27.45 26.20 95.45 100
690 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) under the command area of Dharma Danga Piped Water Supply Scheme , SM/07545 Retrofitting Balance work for construction of OHR having capacity 300 CuM along with other allied works in connection with augmentation of Dharmadanga PWSS under Kalna Sub Division under Burdwan Division, PHE. Dte. Assistant Engineer Junior Engineer, R.W.S. Burdwan Sub Division, P.H.E. Dt ORD/000331/2025-2026 1354/BWD 06/05/2025 45 S.K. CONSTRUCTION 15.87 0.00 0 100
691 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Kashipur Piped Water Supply Scheme at Purbasthali-II Block , SM/07802 Retrofitting Supply of materials for different water supply scheme under Burdwan Division, PHE Dte. VCH/001013/2021-2022 21/01/2022 0 EXECUTIVE ENGINEER, RESOURCES DIVISION, P.H.E. DTE. 617.98 0.00 0 0
692 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Kashipur Piped Water Supply Scheme at Purbasthali-II Block , SM/07802 Retrofitting Payment for supply of materials for different water supply scheme under Burdwan Division, PHE Dte. VCH/001045/2021-2022 934/DW 31/01/2022 0 EXECUTIVE ENGINEER, RESOURCES DIVISION, P.H.E. DTE. 617.98 0.00 0 0
693 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Kashipur Piped Water Supply Scheme at Purbasthali-II Block , SM/07802 Retrofitting Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Kashipur (Part) village (Kashipur habitation) of Kashipur Piped Water Supply Scheme within Durgapur Sub-Divn. under Burdwan Division, PHE. Dte. [SL. No. : 18] [Agr. No. 720/BWD of 2020-2021] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000375/2020-2021 1441/BWD 18/02/2021 15 PREMANANDA ROY BISWAS 4.48 0.00 0 1
694 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Kashipur Piped Water Supply Scheme at Purbasthali-II Block , SM/07802 Retrofitting Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Kashipur village (Kashipur habitation) of Kashipur Piped Water Supply Scheme within Kalna Sub-Divn. under Burdwan Division, PHE. Dte. [SL. No. : 20] AE(HQs) J.E. 2 BURDWAN ORD/000466/2020-2021 596/BWD 25/01/2021 15 IYASIN DAFADAR 4.86 6.57 135.19 1
695 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of MADHABPUR Piped Water Supply Scheme , SM/07862 Retrofitting Continuation work order for Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Jarogram village and Jarogram habitation of Madhabpur piped water supply scheme within Burdwan Sub-Division under Burdwan Division, PHE Dte. [Phase-I](Tr No.-662/BWD/2020-21) Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000259/2020-2021 4911/BWD 08/12/2020 30 SUPRIYA RAY 4.87 9.73 199.79 1
696 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of MADHABPUR Piped Water Supply Scheme , SM/07862 Retrofitting Continuation work order for Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Gureghar village and Gureghar habitation of Madhabpur piped water supply scheme within Burdwan Sub-Division under Burdwan Division, PHE Dte. [Phase-I](Tr No.-557/BWD/2020-21) Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000260/2020-2021 4910/BWD 08/12/2020 30 KAUSHIK RAY 4.87 9.73 199.79 1
697 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of MADHABPUR Piped Water Supply Scheme , SM/07862 Retrofitting Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Gureghar village and Gureghar habitation of Madhabpur piped water supply scheme within Burdwan Sub-Division under Burdwan Division, PHE Dte. [Phase-I](Tr No.-440/BWD/2020-21) Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000165/2020-2021 3332/BWD 18/09/2020 30 KAUSHIK RAY 4.87 9.73 199.79 1
698 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of MADHABPUR Piped Water Supply Scheme , SM/07862 Retrofitting Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Jarogram village and Jaragram habitation of Madhabpur piped water supply scheme within Burdwan Sub-Division under Burdwan Division, PHE Dte. [Phase-I](Tr No.-441/BWD/2020-21) Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000173/2020-2021 3333/BWD 18/09/2020 30 SUPRIYA RAY 4.87 9.73 199.79 1
699 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of MADHABPUR Piped Water Supply Scheme , SM/07862 Retrofitting Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Dumo village (Dumo habitation) & Satgoria village (Satgoria habitation) of Madhabpur Piped Water Supply Scheme within Burdwan Sub-Divn. under Burdwan Division, PHE. Dte. [SL. No. : 07] [Agr. No.721/BWD of 2020-2021] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000376/2020-2021 1418/BWD 18/02/2021 15 BRINDABAN KONAR 4.86 9.72 200 1
700 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of MADHABPUR Piped Water Supply Scheme , SM/07862 Retrofitting Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Madhabpur village and Madhabpur habitation of MADHABPUR Piped Water Supply Scheme within Burdwan Sub-Divn. under Burdwan Division, PHE. Dte. [Phase - I] [GROUP : ¿7C¿] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000847/2020-2021 3334/BWD 18/09/2020 30 KAJAL MUKHERJEE 4.86 4.86 100 1
701 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of MADHABPUR Piped Water Supply Scheme , SM/07862 Retrofitting Continuation work order for Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Mirzapur village (Mirzapur habitation) of Madhabpur Piped Water Supply Scheme within Burdwan Sub-Divn. under Burdwan Division, PHE. Dte. [SL. No. : 10] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000194/2021-2022 6189/BWD 28/10/2021 15 JAI MAA DURGA & CO. 2.19 2.19 100 1
702 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of MADHABPUR Piped Water Supply Scheme , SM/07862 Retrofitting Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Madhabpur (Part) village (Madhabpur (P) habitation) of Madhabpur Piped Water Supply Scheme within Burdwan Sub-Divn. under Burdwan Division, PHE. Dte. [SL. No. : 06] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000458/2020-2021 1417/BWD 18/02/2021 15 KAJAL MUKHERJEE 4.86 3.28 67.49 1
703 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of MADHABPUR Piped Water Supply Scheme , SM/07862 Retrofitting Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Jargram (Part) village (Jargram (P) habitation) of Madhabpur Piped Water Supply Scheme within Burdwan Sub-Divn. under Burdwan Division, PHE. Dte. [SL. No. : 05] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000421/2020-2021 1416/BWD 18/02/2021 15 LAKSHMIKANTA DAS 4.86 4.86 100 1
704 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of MADHABPUR Piped Water Supply Scheme , SM/07862 Retrofitting Repairing of damaged 180 mm dia UPVC pipeline at Madhabpur village for Madhabpur water supply scheme within Jamalpur Block under Burdwan Division, PHE Dte.[Gr.-I] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000844/2020-2021 79/BSD 19/01/2021 30 KOUSIK MALLICK 4.82 4.70 97.51 1
705 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of MADHABPUR Piped Water Supply Scheme , SM/07862 Retrofitting Continuation work order for Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Madhabpur village and Madhabpur habitation of MADHABPUR Piped Water Supply Scheme within Burdwan Sub-Divn. under Burdwan Division, PHE. Dte. [Phase - I] [GROUP : ¿7C¿] AE(HQs),Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000846/2020-2021 7050/BWD 22/12/2020 30 KAJAL MUKHERJEE 4.86 4.49 92.39 1
706 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of MADHABPUR Piped Water Supply Scheme , SM/07862 Retrofitting Laying of damaged UPVC pipeline with HDPE pipes at Madhabpur village for Madhabpur Zone-I water supply scheme within Jamalpur Block under Burdwan Division, PHE Dte.[Gr.-G] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000534/2021-2022 1478/BSD 09/11/2021 30 KOUSIK MALLICK 3.57 3.56 99.72 1
707 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of MADHABPUR Piped Water Supply Scheme , SM/07862 Retrofitting Continuation work order for Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Jargram (Part) village (Jargram (P) habitation) of Madhabpur Piped Water Supply Scheme within Burdwan Sub-Divn. under Burdwan Division, PHE. Dte. [SL. No. : 05] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000027/2022-2023 2058/BWD 19/04/2022 15 LAKSHMIKANTA DAS 4.86 4.86 100 1
708 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of MADHABPUR Piped Water Supply Scheme , SM/07862 Retrofitting Extension of uPVC pipeline regarding FHTC for Gureghar, Dumo, Basantabati habitation under Madhabpur (Zone-II) W/S. Scheme at Jamalpur Development Block under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000160/2022-2023 3139/BWD 19/07/2022 30 PRATIMA CONSTRUCTION 5.64 5.53 98.05 1
709 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of MADHABPUR Piped Water Supply Scheme , SM/07862 Retrofitting Extension of uPVC pipeline for providing FHTC from existing distribution pipe line system within command area of MADHABPUR (Zone-II) W/S Scheme at Khalerpar under Gureghar village, Jamalpur Development Block under Burdwan Division, PHE Dte". Gr,B. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000562/2022-2023 2099/BSD 28/11/2022 30 PRATIMA CONSTRUCTION 0.90 0.90 100 1
710 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of MADHABPUR Piped Water Supply Scheme , SM/07862 Retrofitting Sinking of 300 X 200mm dia Tube Well 150 mtr. Depth by D.R. Rig method using UPVC pipe (CD) and UPVC Deep Well Screen (RDS) for 3RD TW site of MADHABPUR (Z-I) W/S Scheme under Jamalpur Block within Burdwan Sub-Division, PHE Dte. ORD/000201/2023-2024 2704/BWD 08/06/2023 30 TULIP ENGINEERS CO-OPERATIVE SOCIETY LTD. 13.26 12.53 94.49 100
711 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of MADHABPUR Piped Water Supply Scheme , SM/07862 Retrofitting Preparation and Submission of DPR for Augmentation of MADHABPUR PWSS under Jamalpur Development Block under Burdwan Division, P.H.E Dte.[2nd Call] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000363/2023-2024 1525/BSD 17/07/2023 15 CARTO 0.78 0.77 98.72 100
712 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of MADHABPUR Piped Water Supply Scheme , SM/07862 Retrofitting Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Gureghar village (Gureghar habitation) of Madhabpur Piped Water Supply Scheme within Burdwan Sub-Divn. under Burdwan Division, PHE. Dte. (Part - A). [SL. No. : 08] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. Junior Engineer, R.W.S. Burdwan Sub Division, P.H.E. Dt ORD/000543/2020-2021 1419/BWD 18/02/2021 15 KAUSHIK RAY 4.87 9.73 199.79 0
713 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of MADHABPUR Piped Water Supply Scheme , SM/07862 Retrofitting Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Mirzapur village (Mirzapur habitation) of Madhabpur Piped Water Supply Scheme within Burdwan Sub-Divn. under Burdwan Division, PHE. Dte. [SL. No. : 10] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. Junior Engineer, R.W.S. Burdwan Sub Division, P.H.E. Dt ORD/000536/2020-2021 1421/BWD 18/02/2021 15 JAI MAA DURGA & CO. 4.86 9.73 200.21 0
714 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of MADHABPUR Piped Water Supply Scheme , SM/07862 Retrofitting Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Gureghar village (Gureghar habitation) of Madhabpur Piped Water Supply Scheme within Burdwan Sub-Divn. under Burdwan Division, PHE. Dte. (Part - B). [SL. No. : 09] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. Junior Engineer, R.W.S. Burdwan Sub Division, P.H.E. Dt ORD/000460/2020-2021 1420/BWD 18/02/2021 15 SAIKAT RAY 4.87 4.87 100 0
715 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of MADHABPUR Piped Water Supply Scheme , SM/07862 Retrofitting Extension of pipeline for providing functional household tap connection at Gureghar village of MADHABPUR Zone-II piped water supply scheme within Burdwan Sub-Division under Burdwan Division, PHE Dte. [Gr.-A] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. Junior Engineer, R.W.S. Burdwan Sub Division, P.H.E. Dt ORD/000234/2021-2022 1128/BSD 26/08/2021 45 SAIKAT RAY 1.40 1.25 89.29 0
716 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of MADHABPUR Piped Water Supply Scheme , SM/07862 Retrofitting Construction of switch rooms & Rising main at different TW site for MADHABPUR (Zone-I) Piped Water Supply Scheme under Jamalpur Block, District:- Purba-Bardhaman under Burdwan Division, PHE. Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. RWS_JAMALPUR ORD/000532/2023-2024 3629/BWD 21/08/2023 60 DEBJYOTI GOSWAMI 9.11 7.42 81.45 80
717 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Eruar Piped Water Supply Scheme at Bhatar Block , SM/07780 Retrofitting Providing Functional Household Tap connection (FHTC) from existing distribution system within the command area of ERUAR piped water supply scheme at Muratipur (Part) (Muratipur Part Habitation) village (Mouza) within Bhatar Block under Burdwan Division, PHE Dte._2nd Call. Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000765/2020-2021 1266/BWD 11/02/2021 30 S.N. ENTERPRISE 18.71 8.73 46.66 1
718 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Eruar Piped Water Supply Scheme at Bhatar Block , SM/07780 Retrofitting Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of ERUAR Piped Water Supply Scheme at Eruar (Part-A) (Eruar (Part-A) Habitation) village (Mouza), Bhatar Block under Burdwan Division, PHE Dte. (Agreement no. 569/BWD of 2020-2021) Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000290/2020-2021 356/BWD 15/01/2021 30 HAFIJUR RAHAMAN MIDYA 19.95 12.15 60.9 1
719 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Eruar Piped Water Supply Scheme at Bhatar Block , SM/07780 Retrofitting Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of ERUAR Piped Water Supply Scheme at Eruar (Part-D) (Eruar (Part-D) Habitation) village (Mouza), Bhatar Block under Burdwan Division, PHE Dte. ._2ND CALL (Agreement No.703/BWD of 2020-2021) Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000296/2020-2021 1569/15/BWD 22/02/2021 30 DUBE ENTERPRISE 18.61 23.00 123.59 1
720 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Eruar Piped Water Supply Scheme at Bhatar Block , SM/07780 Retrofitting Providing Functional Household Tap Connection (FHTC) & Restoration of pipeline at Sixteen Nos. samsad of Eruar Gram Panchayat from ERUAR Piped Water Supply Scheme at Bhatar Block under Burdwan Division, PHE Dte. Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000296/2021-2022 7033/BWD 17/12/2021 60 IJABUL SEKH 92.08 76.47 83.05 1
721 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Eruar Piped Water Supply Scheme at Bhatar Block , SM/07780 Retrofitting Providing Left-Out FHTC to Eruar Habitation within ERUAR PWSS, within Durgapur (Burdwan North) Sub-Division, PHE Dte, under Burdwan Division, PHE Dte. Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer2, Durgapur Sub-Division, PHE Dte. ORD/000382/2023-2024 557/DSD 20/07/2023 30 SANDIPAN SENGUPTA 4.44 0.00 0 0
722 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Eruar Piped Water Supply Scheme at Bhatar Block , SM/07780 Retrofitting Providing Functional Household tap connection (FHTC) from existing distribution system within the command area of ERUAR piped water supply scheme at Eruar (Part-B) (Eruar (Part-B) Habitation) village (Mouza), Bhatar Block under Burdwan Division, PHE Dte. [Tr No.-678/BWD/20-21] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000386/2020-2021 1264/BWD 11/02/2021 30 S.T. ENTERPRISE 22.24 0.82 3.69 100
723 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Eruar Piped Water Supply Scheme at Bhatar Block , SM/07780 Retrofitting Providing Functional House hold Tap connection (FHTC) from existing distribution system within the command area of ERUAR piped water supply scheme at Erusr (Part-C) (Eruar Part-C Habitation) village (Mouza) within Bhatar Block under Burdwan Division, PHE Dte. Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000763/2020-2021 1265 /BWD 11/02/2021 30 S.T. ENTERPRISE 18.05 30.08 166.65 1
724 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Eruar Piped Water Supply Scheme at Bhatar Block , SM/07780 Retrofitting Extension of pipeline at "Sansad No. 10, 11 and 24" of Eruar and its adjoining mouza's Piped W/S Scheme at Bhatar Block within Durgapur (Bardhaman North) Sub Division under Burdwan Division, P.H.E. Dte. [Gr.-N] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000173/2021-2022 607/DSD 07/10/2021 30 DUBE ENTERPRISE 3.15 2.30 73.02 1
725 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Eruar Piped Water Supply Scheme at Bhatar Block , SM/07780 Retrofitting Hire & fuel charges of vehicle (Car No.-WB-41D-4561) for the office of the Assistant Engineer, Durgapur Sub-Division, PHE Dte. for the month of September & October'2022. BILL/00142/2022-2023 823/VEH 02/12/2022 0 SUJAUDDIN SEKH 0.73 0.00 0 0
726 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Eruar Piped Water Supply Scheme at Bhatar Block , SM/07780 Retrofitting Hire & fuel charges of vehicle (Car No.-WB-37C-8293) for the office of the Assistant Engineer, Durgapur Sub-Division, PHE Dte. for the month of November'2022. BILL/00286/2022-2023 954/JJM/22-23 13/01/2023 0 SUJAUDDIN SEKH 0.38 0.00 0 0
727 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Eruar Piped Water Supply Scheme at Bhatar Block , SM/07780 Retrofitting Laying of pipeline for ERUAR Piped Water Supply Scheme in Bhatar Block under Burdwan Division, PHE. Dte. Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000443/2024-2025 3079/BWD 09/08/2024 90 SOUMYAVASH DAS 5.01 0.00 0 0
728 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Eruar Piped Water Supply Scheme at Bhatar Block , SM/07780 Retrofitting Construction of 1.5 mtrs. Height Boundary Wall along with 750 mm Height 3 layer barbed wire around Other than head work site(ERRUAR4 TH Pump House),Kaluttak under ERUAR PWSS, Bhatar Dev. Block, within Durgapur (Burdwan North) Sub-Division under Burdwan Division, P.H.E. DTE. JUNIOR ENGINEER DURGAPUR SUB-DIVISION PHE DTE ORD/000936/2024-2025 1082/DSD 11/12/2024 60 SWAPAN KUMAR ROY 3.72 0.00 0 0
729 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Eruar Piped Water Supply Scheme at Bhatar Block , SM/07780 Retrofitting Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Muratipur village and Muratipur habitation of ERUAR Piped Water Supply Scheme within Durgapur (Burdwan North) Sub-Divn. under Burdwan Division, PHE. Dte. [Phase - I] [GROUP : ¿11B¿] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer ORD/000457/2020-2021 4748/BWD 01/12/2020 30 S. MONDAL 4.86 9.73 200.21 0
730 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Eruar Piped Water Supply Scheme at Bhatar Block , SM/07780 Retrofitting Replacing of existing damaged pipe line at KALUTAK and repairing of 4th Pump house and changing of 2 nos. valve at ERUAR village of ERAUR PWSS of Bhatar Block within Durgapur (Burdwan North) Sub- Division under Burdwan Division PHE Dte. Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer ,JUNIOR ENGINEER DURGAPUR SUB-DIVISION PHE DTE ORD/000937/2023-2024 909/DSD 15/12/2023 45 SWAPAN KUMAR ROY 0.93 0.61 65.59 100
731 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting at Sudpur PWSS , SM/06769 Retrofitting Urgent repairing work at Sudpur piped water supply scheme to ensuring FHTC work under Katwa-I Block under Katwa Sub-Division, under Burdwan Division, PHE Dte.[Tr No.-875/BWD/20-21] Assistant Engineer JUNIOR ENGINEER KATWA SUB-DIVISION PHE DTE ORD/000614/2020-2021 91/KTS 12/02/2021 3 HAMID SK 0.92 1.84 200 1
732 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting at Sudpur PWSS , SM/06769 Retrofitting Extension of pipe line from the existing Distribution System within scheme jurisdiction at Rayerpara, Purba and Paschim Bijoynagar village under SUDPUR PWSS under Katwa Sub-Division under Burdwan Division PHE Dte [Sl - 5 ] Assistant Engineer JUNIOR ENGINEER KATWA SUB-DIVISION PHE DTE ORD/000125/2021-2022 565/KTS 31/08/2021 15 HAMID SK 3.60 0.00 0 1
733 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting at Sudpur PWSS , SM/06769 Retrofitting Extension of pipe line from the existing Distribution System within scheme jurisdiction at Sudpur, Lokpur & Narayanpur village under SUDPUR PWSS under Katwa Sub-Division under Burdwan Division PHE Dte [Sl - 4 ] Assistant Engineer JUNIOR ENGINEER KATWA SUB-DIVISION PHE DTE ORD/000120/2021-2022 564/KTS 31/08/2021 15 BABUL SK 2.42 0.00 0 1
734 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting at Sudpur PWSS , SM/06769 Retrofitting Balance work of OHR at Head Work site, construction of HUME Pipe culvert , Road restoration work and boundary wall at 2nd TW site with Gate, land development at Head work site and 2nd TW site under KAITHAN, SUDPUR & PANUHAT Piped Water Supply Scheme under KATWA -I Block, under Katwa Sub-Division within Burdwan Division, PHE Dte. Assistant Engineer JUNIOR ENGINEER KATWA SUB-DIVISION PHE DTE ORD/000486/2024-2025 3141/BWD 20/08/2024 120 VISHAL CONSTRUCTION CO. 126.29 0.00 0 50
735 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting at Sudpur PWSS , SM/06769 Retrofitting Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of SUDPUR Piped Water Supply Scheme (PART-A) at Katwa-I Block under Burdwan Division, PHE Dte. [Agreement No. 44/2020-2021 OF SE/CC/PHE. DTE.] Assistant Engineer ORD/000058/2020-2021 4290/BWD 03/11/2020 90 MD HASIN 86.85 137.68 158.53 1
736 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Suhari Piped Water Supply Scheme , SM/07823 Retrofitting Continuation work order for water tap connection in each house hold from existing distribution system within scheme jurisdiction in Purba Krishnapur village of Suhari piped water supply scheme within Burdwan Sub-Division under Burdwan Division, PHE Dte.[Phase-I] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000677/2020-2021 1326/BWD 12/02/2021 30 SAMANTA CONSTRUCTION 4.92 3.50 71.14 1
737 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Suhari Piped Water Supply Scheme , SM/07823 Retrofitting Providing FHTC (650 Nos.) from dist. System within the command area of SUHARI piped water supply scheme at Masjidpara, Allahadipara, Varpally, Saktigarh Utttar Bazar Habitation (Putunda & Saktigarh Mouza) at Bardhhaman-II Development Block under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000294/2021-2022 7027/BWD 17/12/2021 30 YOUNG ENGINEERS CO.-OPERATIVE SOCIETY LTD. 19.58 19.58 100 1
738 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Suhari Piped Water Supply Scheme , SM/07823 Retrofitting Providing FHTC in Jarul village for 100% coverage in Sajal Gram from existing distribution system within SUHARI PWSS, Bardhhaman-II Development Block under Burdwan Division, PHE Dte.(Part-A). Gr.K. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000347/2022-2023 1381/BWD 05/08/2022 5 SAMANTA CONSTRUCTION 0.96 0.00 0 0
739 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Suhari Piped Water Supply Scheme , SM/07823 Retrofitting Providing FHTC in Jarul village for 100% coverage in Sajal Gram from existing distribution system within SUHARI PWSS, Bardhhaman-II Development Block under Burdwan Division, PHE Dte.(Part-B).Gr.L. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000348/2022-2023 1382/BSD 05/08/2022 5 SAMANTA CONSTRUCTION 0.96 0.00 0 0
740 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Suhari Piped Water Supply Scheme , SM/07823 Retrofitting Providing FHTC in Shuhari village for 100% coverage in Sajal Gram from existing distribution system within SUHARI PWSS, Bardhhaman-II Development Block under Burdwan Division, PHE Dte.(Part-A).Gr.M. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000349/2022-2023 1383/BSD 05/08/2022 5 SAMANTA CONSTRUCTION 0.97 0.00 0 0
741 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Suhari Piped Water Supply Scheme , SM/07823 Retrofitting Providing FHTC in Shuhari village for 100% coverage in Sajal Gram from existing distribution system within SUHARI PWSS Bardhhaman-II Development Block under Burdwan Division, PHE Dte.(Part-B). Gr.N. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000350/2022-2023 1384/BSD 05/08/2022 5 SAMANTA CONSTRUCTION 0.96 0.00 0 0
742 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Suhari Piped Water Supply Scheme , SM/07823 Retrofitting Providing FHTC in Atagar village for 100% coverage in Sajal Gram from existing distribution system within SUHARI PWSS Bardhhaman-II Development Block under Burdwan Division, PHE Dte. Gr.O. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000351/2022-2023 1390/BSD 08/08/2022 5 SAMANTA CONSTRUCTION 0.56 0.00 0 0
743 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Suhari Piped Water Supply Scheme , SM/07823 Retrofitting Providing leftout water tap connection in different villages for 100% coverage in Sajal Gram from existing distribution system within scheme jurisdiction of different Piped Water Supply Schemes within Burdwan ¿ II Block under Burdwan Division, PHE. Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000416/2021-2022 385/BWD 20/01/2022 30 BISWAS ENTERPRISE 11.97 1.50 12.53 100
744 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Suhari Piped Water Supply Scheme , SM/07823 Retrofitting Construction of Pump House cum chlorine room without sanitary and water supply arrangement at Tube Well Site to departmental drawing no-PHE/BD/P.H/DRG/02/DEC-17(Size 3.60 mtr x 3.00 mtr room) for SUHARI its Adjoining Mouza W/S Scheme, Block -Bardhaman-II within Burdwan Sub-Division, PHE Dte. (Mouza- PURBA KRISHNAPUR) Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000767/2022-2023 502/BSD 21/03/2023 45 M/S PALASH BISWAS 3.45 2.83 82.03 100
745 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Suhari Piped Water Supply Scheme , SM/07823 Retrofitting Providing FHTC for 100% coverage in different village (SUHARI, JARUL, ATTAGAR & GHATSHILA) from existing distribution system within SUHARI PWSS, Bardhhaman-II Development Block under Burdwan Division, PHE Dte._2ND CALL Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. Junior Engineer, Burdwan Sadar Sub-Division ORD/000572/2023-2024 3722/BWD 25/08/2023 30 BIPLAB SAMANTA 18.91 16.58 87.68 100
746 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Suhari Piped Water Supply Scheme , SM/07823 Retrofitting Providing functional household tap connection (FHTC) from existing distribution system within the command area of Suhari piped water supply scheme at Putunda, Atagarh (08 Nos. Habitation), Ghatshila (04 Nos. Habitation), Jarur (02 Nos. Habitation), Saiadpur Chak, Tajpur (04 Nos. Habitation) village, Bardhaman-II Block under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. Junior Engineer, Burdwan Sadar Sub-Division ORD/000529/2020-2021 5004/BWD 10/12/2020 90 NATIONAL CONSTRUCTION 80.78 15.48 19.16 0
747 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Suhari Piped Water Supply Scheme , SM/07823 Retrofitting Designing, Making and Erection of Sign Board for SAJAL GRAM in Tajpur Village, Burdwan - II Block within Suhari PWSS under Burdwan Division, PHE Dte. (5 Nos Board) AE(HQs) J.E. 1 BURDWAN ORD/000773/2023-2024 853/AE/HQ 06/11/2023 30 MANABSEBA PROKALPA & CONSTRUCTIONS 0.75 0.72 96 100
748 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Suhari Piped Water Supply Scheme , SM/07823 Retrofitting Providing laying distribution pipe line due to shal balla pileing at Sontoshpur village by P.Samiti for SUHARI PWSS at Bardhhaman-II Development Block under Burdwan Division,PHE Dte Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. Junior Engineer, Burdwan Sadar Sub-Division ORD/001178/2023-2024 537/BSD 14/03/2024 30 M/S PALASH BISWAS 0.89 0.89 100 100
749 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Suhari Piped Water Supply Scheme , SM/07823 Retrofitting Providing left out FHTC for Putunda village within SUHARI PWSS , Bardhhaman-II Development Block under Burdwan Division, PHE Dte Junior Engineer, Burdwan Sadar Sub-Division ORD/000144/2024-2025 1032/BSD 10/06/2024 30 ISHAN CONSTRUCTION 0.96 0.95 98.96 100
750 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Suhari Piped Water Supply Scheme , SM/07823 Retrofitting Allied work for inter connection between 3rd tube well site and laying distribution system for Suhari PWSS within Bardhaman-II Block , under Burdwan Division, PHE Dte Junior Engineer, Burdwan Sadar Sub-Division ORD/000292/2024-2025 1274/BSD 12/07/2024 7 ISHAN CONSTRUCTION 2.34 2.34 100 100
751 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Suhari Piped Water Supply Scheme , SM/07823 Retrofitting Different type of works related (Toilet, Drain, Internal pathways, Land-Development, repair of boundary wall &pump houses and road restoration) under SUHARI PWSS under Burdwan-II Block under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. Junior Engineer, Burdwan Sadar Sub-Division ORD/001030/2024-2025 144/BWD 08/01/2025 250 M/S PALASH BISWAS 17.92 0.00 0 100
752 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Suhari Piped Water Supply Scheme , SM/07823 Retrofitting Conducting physical Household Survey at the IMIS reported village for HGJ certification and providing balance FHTC for Har Ghar Jal certification including conducting Gram Sabhas for different IMIS reported villages across the district under Burdwan Division, PHE Dte. AE(HQs),Assistant Engineer ,Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE.,Assistant Engineer, Durgapur Sub Division, P.H.E. Dte JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000428/2024-2025 3107/BWD 12/08/2024 323 TUBGRAM GRAMMYAK UNNAYAN SAMITY 309.60 0.00 0 85
753 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Suhari Piped Water Supply Scheme , SM/07823 Retrofitting Designing, making and erection of Sign Board for SWAJAL GRAM in Ghatshila village of Burdwan-II Block under Suhari Piped Water Supply Scheme within Burdwan Sub-Division under Burdwan Division,PHE Dte (5 Nos. Board) Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. Junior Engineer, Burdwan Sadar Sub-Division ORD/000447/2025-2026 2310/BSD 19/08/2025 10 MANABSEBA PROKALPA & CONSTRUCTIONS 0.72 0.00 0 100
754 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Suhari Piped Water Supply Scheme , SM/07823 Retrofitting Designing, making and erection of Sign Board for SWAJAL GRAM in Jarur village of Burdwan-II Block under Suhari Piped Water Supply Scheme within Burdwan Sub-Division under Burdwan Division,PHE Dte(5 nos Board) Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. Junior Engineer, Burdwan Sadar Sub-Division ORD/000468/2025-2026 2334/BSD 21/08/2025 10 MANABSEBA PROKALPA & CONSTRUCTIONS 0.72 0.00 0 100
755 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Suhari Piped Water Supply Scheme , SM/07823 Retrofitting Designing, making and erection of Sign Board for SWAJAL GRAM in Tajpur village of Burdwan-II Block under Suhari Piped Water Supply Scheme within Burdwan Sub-Division under Burdwan Division, PHE Dte (5 nos Board) Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. Junior Engineer, Burdwan Sadar Sub-Division ORD/000613/2025-2026 2357/BSD 21/08/2025 10 MANABSEBA PROKALPA & CONSTRUCTIONS 0.72 0.00 0 100
756 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Suhari Piped Water Supply Scheme , SM/07823 Retrofitting Designing,making and erection of Sign Board for SWAJAL GRAM in Suhari village of Burdwan-II Block under Suhari Piped Water Supply Scheme within Burdwan Sub-Division under Burdwan Division,PHE Dte (5 Nos. Board) Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. Junior Engineer, Burdwan Sadar Sub-Division ORD/000445/2025-2026 2308/BSD 19/08/2025 10 MANABSEBA PROKALPA & CONSTRUCTIONS 0.72 0.00 0 100
757 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Majhergram Piped Water Supply Scheme , SM/07825 Retrofitting Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Dhanya Kherur village and Deleypara, Malpara, Mandalpara, Paschimpara & Purba Daspara habitation of Majhergram piped water supply scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. [Phase-I](Tr No.-385/BWD/2020-21) Assistant Engineer ORD/000257/2020-2021 4124/BWD 16/10/2020 30 SUBRATA GUPTA 4.86 9.73 200.21 1
758 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Majhergram Piped Water Supply Scheme , SM/07825 Retrofitting Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Sihigram village and Adibashipara, Hindupara (Sihigram), Kamarpara & Makarpara habitation of Majhergram piped water supply scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. [Phase-I](Tr No.-605/BWD/2020-21) Assistant Engineer ORD/000249/2020-2021 4125/BWD 16/10/2020 30 N.S. ENTERPRISE 4.86 6.21 127.78 1
759 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Majhergram Piped Water Supply Scheme , SM/07825 Retrofitting Continuation work order for Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Dhanya Kherur village and Duleypara, Malpara, Mandalpara, Paschimpara & Purba Daspara Habitation of Majhergram piped water supply scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. [Phase-I] Assistant Engineer ORD/000607/2020-2021 260/BWD 13/01/2021 30 SUBRATA GUPTA 4.86 9.73 200.21 1
760 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Majhergram Piped Water Supply Scheme , SM/07825 Retrofitting Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of Majhergram Piped Water Supply Scheme at Sihigram (P) (Paschimpara habs.), Sonagachi (3 Nos. habs.), Majhergram (8 Nos. habs.) & Ganguria (3 Nos. habs), Monteswar Block under Burdwan Division, PHE Dte. Assistant Engineer ORD/000639/2020-2021 1497/BWD 18/02/2021 60 INDIAN ENGINEERS CO.-OPERATIVE SOCIETY LTD. 57.97 74.34 128.24 1
761 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Majhergram Piped Water Supply Scheme , SM/07825 Retrofitting Extension of 63 mm dia UPVC pipeline to provide house connection to the beneficiaries of Sihigram village of Majhergram water supply scheme within Kalna Sub-Division under Burdwan Division, PHE Dte.[Sl No.-D] Assistant Engineer ORD/000859/2020-2021 141/KSD 12/02/2021 30 GOUTAM DEY 3.14 2.96 94.27 1
762 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Majhergram Piped Water Supply Scheme , SM/07825 Retrofitting Continuation work for Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Sihigram village and Adibasipara, Hindupara (Sihigram), Kamarpara & Makarpara habitation of Majhergram Piped Water Supply Scheme within Kalna Sub-Divn. under Burdwan Division, PHE. Dte. [Phase - I] [GROUP : ¿11B¿] Assistant Engineer ORD/000658/2021-2022 1667/BWD 23/03/2022 30 N.S. ENTERPRISE 4.16 3.66 87.98 1
763 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Majhergram Piped Water Supply Scheme , SM/07825 Retrofitting Supply of materials for different water supply scheme under Burdwan Division, PHE Dte. VCH/001237/2021-2022 1132/DW 26/02/2022 0 EXECUTIVE ENGINEER, RESOURCES DIVISION, P.H.E. DTE. 221.00 0.00 0 0
764 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Majhergram Piped Water Supply Scheme , SM/07825 Retrofitting Construction of sanitary Latrine and water supply arrangement at Head Work Site of Majhigram Singot piped water supply schemes under Mongalkote Block under Katwa Sub-Division under Burdwan Division, PHE Dte.[Sl No-01] Assistant Engineer ORD/000593/2021-2022 159/KTS 24/02/2022 21 BABUL SK 1.76 0.00 0 1
765 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Majhergram Piped Water Supply Scheme , SM/07825 Retrofitting Material Requisition To Resource Division RTOR000125/2021-2022 1106/BWD 26/02/2022 0 Resource Division 44.82 0.00 0 0
766 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Majhergram Piped Water Supply Scheme , SM/07825 Retrofitting Hire & fuel charges of vehicle (Car No.-WB-41J-6795) for the office of the Deputy Superintending Engineer, Central Circle, PHE Dte. for the month of November & December'22. BILL/00464/2022-2023 1131/JJM 28/02/2023 0 MD HASIN 0.72 0.00 0 0
767 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Majhergram Piped Water Supply Scheme , SM/07825 Retrofitting Restoration of Nepakuli -Baghnapara road from 1.50 km to 2.50 km damaged due to laying of underground water pipe line by PHE with box cutting and Jhama moorum consolidation under Kalna Highway Sub-Division of Burdwan South Highway Division , P.W (Roads) Dte. during the year 2023-2024 BILL/00892/2024-2025 1025/JJM 05/10/2024 0 EXECUTIVE ENGINEER BURDWAN SOUTH HIGHWAY DIVISION P.W. (ROADS) DTE. 1.74 0.00 0 0
768 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Serua Piped Water Supply Scheme at Bhatar Block , SM/07828 Retrofitting Continuation work order for Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Basuda village and Basuda Habitation of Serua piped water supply scheme within Durgapur (Bardhaman North) Sub-Division under Burdwan Division, PHE Dte. [Phase-I][Gr.-9A] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000791/2020-2021 4086/BWD 16/10/2020 30 DHIRENDRANATH SOM 4.87 0.00 0 1
769 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Serua Piped Water Supply Scheme at Bhatar Block , SM/07828 Retrofitting Extension of pipeline at "Bamunara & Kumarun & Sakraw" villages of Serua and its adjoining mouza's Piped W/S Scheme at Bhatar Block within Durgapur Sub Division under Burdwan Division, P.H.E. Dte. [Gr.-F] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000335/2021-2022 05/DSD 03/01/2022 30 DHIRENDRANATH SOM 2.98 0.00 0 0
770 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Serua Piped Water Supply Scheme at Bhatar Block , SM/07828 Retrofitting Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of Serua Piped Water Supply Scheme at Rajipur, Ratanpur, Serua & Basuda (P) village, Bhatar Block under Burdwan Division, PHE Dte.[Agreement No. 708/BWD OF 2020-2021] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000340/2020-2021 1580/BWD 22/02/2021 60 SUPER CO. OPERATIVE LABOUR CONTRACT AND CONSTRUCTION SOCIETY LTD. 74.30 78.25 105.32 1
771 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Serua Piped Water Supply Scheme at Bhatar Block , SM/07828 Retrofitting Extension of 180 mm dia pipeline at "Serua" villages of Serua and its adjoining mouza's Piped W/S Scheme at Bhatar Block within Durgapur Sub Division under Burdwan Division, P.H.E. Dte. [Gr.-A] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000331/2021-2022 01/DSD 03/01/2022 30 DHIRENDRANATH SOM 4.82 4.80 99.59 1
772 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Serua Piped Water Supply Scheme at Bhatar Block , SM/07828 Retrofitting Extension of 50 mm dia. pipeline at "Serua-Basuda-Jhujkadanga" villages of Serua and its adjoining mouza's Piped W/S Scheme at Bhatar Block within Durgapur Sub Division under Burdwan Division, P.H.E. Dte.[Gr.-C] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000332/2021-2022 02/DSD 03/01/2022 30 DHIRENDRANATH SOM 1.84 0.86 46.74 1
773 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Serua Piped Water Supply Scheme at Bhatar Block , SM/07828 Retrofitting Extension of pipeline at "Panua, Ratanpur & Rajipur" villages of Serua and its adjoining mouza's Piped W/S Scheme at Bhatar Block within Durgapur Sub Division under Burdwan Division, P.H.E. Dte. [Gr.-E] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000334/2021-2022 04/DSD 03/01/2022 30 DHIRENDRANATH SOM 4.68 2.09 44.66 1
774 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Serua Piped Water Supply Scheme at Bhatar Block , SM/07828 Retrofitting Providing leftout water tap connection in different villages for 100% coverage to make it Sajal Gram from existing distribution system within scheme jurisdiction of different Piped Water Supply Schemes within Bhatar Block under Burdwan Division, PHE. Dte. Assistant Engineer ,Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000389/2021-2022 268/BWD 14/01/2022 30 BHARAT CONSTRUCTION 14.17 0.00 0 1
775 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Serua Piped Water Supply Scheme at Bhatar Block , SM/07828 Retrofitting Relaying of distribution main in alternate route for improvement of water supply at Basudha (South Panoa) village within Serua water supply scheme in Bhatar Block under Burdwan Division, PHE Dte. Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000698/2021-2022 6119/BWD 25/10/2021 30 KOUSIK MALLICK 26.54 25.91 97.63 1
776 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Serua Piped Water Supply Scheme at Bhatar Block , SM/07828 Retrofitting Trial boring at Kumarun for Serua and its Adjoining Mouza Water Supply Scheme within Bhatar Block under Burdwan Division PHE Dte. [Gr.-C] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000314/2022-2023 526/DSD 22/08/2022 7 BABA ADHIRA CONSTRUCTION 0.60 0.60 100 1
777 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Serua Piped Water Supply Scheme at Bhatar Block , SM/07828 Retrofitting Trial boring at Serua for Serua and its Adjoining Mouza Water Supply Scheme within Bhatar Block under Burdwan Division PHE Dte. [Gr.-D] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000315/2022-2023 527/DSD 22/08/2022 7 BABA ADHIRA CONSTRUCTION 0.60 0.60 100 1
778 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Serua Piped Water Supply Scheme at Bhatar Block , SM/07828 Retrofitting Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of Serua Piped Water Supply Scheme at Bamunara village (Bamunara habs), Jhujkadanga village, Kumarun village & Panua (P) village (Panua (P) & Sakra habs), Bhatar Block under Burdwan Division, PHE Dte.[ Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000344/2020-2021 1579/BWD 22/02/2021 60 SUPER CO. OPERATIVE LABOUR CONTRACT AND CONSTRUCTION SOCIETY LTD. 54.03 66.71 123.47 1
779 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Serua Piped Water Supply Scheme at Bhatar Block , SM/07828 Retrofitting Sinking of 250 X 150 mm dia Tubewell, Construction of pump House, Connection with pump house and Modification to distribution network by making a loop and extension with uPVC pipe to augment the Water Supply to FHTC at Kumarun and Serua village of SERUA and its adjoining mouzas W/S Scheme under Burdwan Division, P.H.E. Dte. Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000281/2024-2025 989/BWD 17/03/2025 289 KOUSIK MALLICK 49.87 0.00 0 70
780 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Serua Piped Water Supply Scheme at Bhatar Block , SM/07828 Retrofitting Restoration and shifting of pipeline, providing sluice valve, Painting and minor repairing of Switch room, Clearing compound premises, making temporary earthen road and repairing of old Valve chamber, Septic tank etc of Serua Piped water supply Scheme , P.H.E Dte. Block:-Bhatar Dist: Purba Bardhaman. ORD/001417/2024-2025 236/DSD 07/02/2025 45 DHIRENDRANATH SOM 10.43 0.00 0 100
781 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Serua Piped Water Supply Scheme at Bhatar Block , SM/07828 Retrofitting Construction of Boundary wall, Land Development work at Head work site, Construction of approach road from main road to OHR of SERUA Piped water supply Scheme, P.H.E Dte. Block:-Bhatar Dist: Purba Bardhaman. Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/001341/2024-2025 1024/BWD 21/03/2025 90 KALYAN CHOWDHURY 18.74 0.00 0 50
782 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Tehata Piped Water Supply Scheme at Kalna-II Block , SM/07812 Retrofitting Continuation work order for Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Tehata (Part) village Tehata (Part) habitation of Tehata piped water supply scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. [SL NO.-05] Assistant Engineer ORD/000689/2020-2021 1223/BWD 11/02/2021 15 ROY & ROY CONSTRUCTION 3.16 6.32 200 1
783 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Tehata Piped Water Supply Scheme at Kalna-II Block , SM/07812 Retrofitting Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Bajitpur village, Bajit habitation & Jhikra village (Jhikra habitation) of Tehata piped water supply scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. [SL NO.-02] Assistant Engineer ORD/000692/2020-2021 52/BWD 05/01/2021 15 YOUNG ENGINEERS CO.-OPERATIVE SOCIETY LTD. 4.86 9.73 200.21 1
784 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Tehata Piped Water Supply Scheme at Kalna-II Block , SM/07812 Retrofitting Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Baitipara village (Baitipara Habitation) of Tehata piped water supply scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. [Sl No.-01] Assistant Engineer ORD/000709/2020-2021 51/BWD 05/01/2021 15 SUKANTA DEY 4.87 0.00 0 1
785 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Tehata Piped Water Supply Scheme at Kalna-II Block , SM/07812 Retrofitting Continuation work order for Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Baitipara village (Baitipara habitation) of Tehata Piped Water Supply Scheme within Kalna Sub-Divn. under Burdwan Division, PHE. Dte. [Sl. No. : ¿01¿] Assistant Engineer ORD/000123/2021-2022 4020/BWD 05/08/2021 15 SUKANTA DEY 3.23 3.23 100 1
786 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Tehata Piped Water Supply Scheme at Kalna-II Block , SM/07812 Retrofitting Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Tehata (Part) village, Tehata (Part) habitation of Tehata piped water supply scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. [SL NO.-05] Assistant Engineer ORD/000690/2020-2021 55/BWD 05/01/2021 15 ROY & ROY CONSTRUCTION 4.86 9.72 200 1
787 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Tehata Piped Water Supply Scheme at Kalna-II Block , SM/07812 Retrofitting Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Kutubpur (Part) village (Kutub Habitation) & Suipara village (Suipara Habitation) of Tehata piped water supply scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. [Sl No.-04] Assistant Engineer ORD/000723/2020-2021 54/BWD 05/01/2021 15 INVENT ENGINEERS CO. OPERATIVE SOCIETY LTD. 4.84 9.68 200 1
788 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Tehata Piped Water Supply Scheme at Kalna-II Block , SM/07812 Retrofitting Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Tehata (Part) village (Bajitpur & Sarpukur habitation) of Tehata piped water supply scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. [SL NO.-06] Assistant Engineer ORD/000693/2020-2021 56/BWD 05/01/2021 15 M/S UNIQUE 4.86 9.72 200 1
789 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Tehata Piped Water Supply Scheme at Kalna-II Block , SM/07812 Retrofitting Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of Tehata Piped Water Supply Scheme at Bajitpur (P), Jhiekra (P), Habibpur (P), Narenga Kutubpur (P) & Saipara (P) Village (Mouza), Kalna-II Block under Burdwan Division, PHE Dte. Assistant Engineer ORD/000254/2021-2022 6640/BWD 29/11/2021 30 INVENT ENGINEERS CO. OPERATIVE SOCIETY LTD. 26.96 24.45 90.69 1
790 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Tehata Piped Water Supply Scheme at Kalna-II Block , SM/07812 Retrofitting Providing FHTC work at Agradaha village (25 Nos), Jhikra village (20 Nos), Kutubpur village (122 Nos) Habibpur village (232 Nos) & Bajitpur village (16 Nos) under Tehata Zone-II Water Supply Scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. ORD/000884/2023-2024 5515/BWD 14/12/2023 30 YOUNG ENGINEERS CO.-OPERATIVE SOCIETY LTD. 23.96 0.00 0 0
791 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Tehata Piped Water Supply Scheme at Kalna-II Block , SM/07812 Retrofitting Providing FHTC work at Suipara village (13 Nos), Tehata village (52 Nos), Bajitpur village (18 Nos) Narenga village (282 nos) & Baitipara village (52 Nos) under TEHATA Zone-I Water Supply Scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. ORD/000883/2023-2024 5516/BWD 14/12/2023 30 YOUNG ENGINEERS CO.-OPERATIVE SOCIETY LTD. 19.32 0.00 0 0
792 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Tehata Piped Water Supply Scheme at Kalna-II Block , SM/07812 Retrofitting Work order for " Providing Functional house hold tap connections for Sajal Gram Village within Kalna-II Block under Kalna Sub-Division under Burdwan Division, PHE Dte. (Tehata Water Supply Scheme)" Assistant Engineer JUNIOR ENGINEER R.W.S. BURDWAN SUB-DIVISION PHE DTE ORD/000037/2023-2024 345/KSD 17/04/2023 30 ARINDAM BHATTACHARYA 0.88 0.88 100 100
793 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Tehata Piped Water Supply Scheme at Kalna-II Block , SM/07812 Retrofitting Hire & fuel charges of vehicle Car No.-WB-04G-7127 for the month of July & August'2023. BILL/01047/2023-2024 767/JJM 12/10/2023 0 PARTHA PRATIM ACHARYA 0.78 0.00 0 0
794 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Tehata Piped Water Supply Scheme at Kalna-II Block , SM/07812 Retrofitting Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Kutubpur (Part) village (Habibpur Habitation) of Tehata piped water supply scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. [SL NO.-03] AE(HQs) J.E. 2 BURDWAN ORD/000713/2020-2021 53/BWD 05/01/2021 15 TAPAS KUMAR ROY 4.86 9.73 200.21 0
795 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Tehata Piped Water Supply Scheme at Kalna-II Block , SM/07812 Retrofitting Vehicle bill [car No.-WB-04G-7127] for the month of October & November'2023. BILL/02061/2023-2024 1321/JJM 01/02/2024 0 PARTHA PRATIM ACHARYA 0.73 0.00 0 0
796 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Tehata Piped Water Supply Scheme at Kalna-II Block , SM/07812 Retrofitting Vehicle bill for the month of August & September'2023. BILL/01675/2023-2024 1139/JJM 29/12/2023 0 MD HASIN 0.77 0.00 0 0
797 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Tehata Piped Water Supply Scheme at Kalna-II Block , SM/07812 Retrofitting Different types of works involve in connection with Augmentation of TEHATA Zone-I & II (SM/16301) Water Supply Scheme, CHAKSIMLA (SM/15586) Water Supply Scheme & DWARIATON (SM/16285) Water Supply Scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer JUNIOR ENGINEER RWS KALNA2 ORD/000162/2024-2025 2201/BWD 13/06/2024 752 M/S ASHA CONSTRUCTION 449.98 8.47 1.88 25
798 PURBA BARDHAMAN Burdwan Division Augmentation of NAOPARA PWSS for providing Functional Household Tap Connection (FHTC) , SM/09407 Augmentation Preparation of DPR for augmentation of Naopara W/S Scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. (Sl No-I) Assistant Engineer ORD/000576/2021-2022 211/KSD 23/02/2022 21 ROY CHOWDHURY ASSOCIATES 2.43 2.43 100 1
799 PURBA BARDHAMAN Burdwan Division Augmentation of NAOPARA PWSS for providing Functional Household Tap Connection (FHTC) , SM/09407 Augmentation Laying Rising main and distribution pipeline including Providing Functional Household Tap Connection (FHTC) within the command are of Augmentation of NAOPARA Piped W/S. Scheme under Burdwan Division, PHE. Dte. Assistant Engineer ORD/000003/2022-2023 1870/BWD 05/04/2022 45 KOUSIK MALLICK 66.60 66.49 99.83 1
800 PURBA BARDHAMAN Burdwan Division Augmentation of NAOPARA PWSS for providing Functional Household Tap Connection (FHTC) , SM/09407 Augmentation Supply of materials for different water supply scheme under Burdwan Division, PHE Dte. VCH/001578/2021-2022 1207/DW 10/03/2022 0 EXECUTIVE ENGINEER, RESOURCES DIVISION, P.H.E. DTE. 3,005.00 0.00 0 0
801 PURBA BARDHAMAN Burdwan Division Augmentation of NAOPARA PWSS for providing Functional Household Tap Connection (FHTC) , SM/09407 Augmentation Work order for Repairing and laying of UPVC pipeline & providing FHTC work from Mallick oil mil to the house of Khalil Sk at Naopara Water Supply Scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000148/2023-2024 397/KSD 02/05/2023 30 ARINDAM BHATTACHARYA 0.99 0.00 0 0
802 PURBA BARDHAMAN Burdwan Division Augmentation of NAOPARA PWSS for providing Functional Household Tap Connection (FHTC) , SM/09407 Augmentation Supply and delivery of different dia. CIDF sluice valve for Augmentation of Jahannagar, Ganganandapur, Nowapara & Monteswar Piped Water Supply Scheme within Kalna Sub-Division under Burdwan Division, P.H.E. Dte.[Part ¿ A] Assistant Engineer ORD/000323/2022-2023 3632/BWD 22/08/2022 20 RAMASISH ENTERPRISE 12.80 3.20 25 1
803 PURBA BARDHAMAN Burdwan Division Augmentation of NAOPARA PWSS for providing Functional Household Tap Connection (FHTC) , SM/09407 Augmentation Material Requisition To Resource Division RTOR000040/2021-2022 542/BWD 27/01/2022 0 Resource Division 9.97 0.00 0 0
804 PURBA BARDHAMAN Burdwan Division Augmentation of NAOPARA PWSS for providing Functional Household Tap Connection (FHTC) , SM/09407 Augmentation Material Requisition To Resource Division RTOR000152/2021-2022 1240/BWD 07/03/2022 0 Resource Division 4.19 0.00 0 0
805 PURBA BARDHAMAN Burdwan Division Augmentation of NAOPARA PWSS for providing Functional Household Tap Connection (FHTC) , SM/09407 Augmentation Material Requisition To Resource Division RTOR000203/2021-2022 1526/BWD 15/03/2022 0 Resource Division 0.37 0.00 0 0
806 PURBA BARDHAMAN Burdwan Division Augmentation of NAOPARA PWSS for providing Functional Household Tap Connection (FHTC) , SM/09407 Augmentation Work order for Repairing and laying of UPVC pipeline & providing FHTC work from wood shop to the house of Patal Das at Naopara Water Supply Scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000147/2023-2024 396/KSD 02/05/2023 30 ER CONSTRUCTION & GENERAL ORDER SUPPLIER 0.99 0.69 69.7 100
807 PURBA BARDHAMAN Burdwan Division Augmentation of NAOPARA PWSS for providing Functional Household Tap Connection (FHTC) , SM/09407 Augmentation Work Order for Repairing and laying of UPVC pipeline & providing FHTC work from the house of Habu Sk to the house of Asadul Kha at Naopara Water Supply Scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000127/2023-2024 421/KSD 11/05/2023 30 ER CONSTRUCTION & GENERAL ORDER SUPPLIER 0.97 0.97 100 100
808 PURBA BARDHAMAN Burdwan Division Augmentation of NAOPARA PWSS for providing Functional Household Tap Connection (FHTC) , SM/09407 Augmentation Work Order for "Repairing and laying of UPVC pipeline & providing FHTC work from the shop of Bhoton Sk to the petrol pump at Naopara Water Supply Scheme within Kalna Sub-Division under Burdwan Division, PHE Dte." JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000553/2023-2024 1308/KSD 23/08/2023 30 ER CONSTRUCTION & GENERAL ORDER SUPPLIER 3.59 3.58 99.72 100
809 PURBA BARDHAMAN Burdwan Division Augmentation of NAOPARA PWSS for providing Functional Household Tap Connection (FHTC) , SM/09407 Augmentation Work Order for "Restoration of Pipeline of Naopara Piped Water Supply Scheme under Kalna Sub-Division under Burdwan Division, PHE Dte. (Sl-1) Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/001131/2023-2024 2060/KSD 23/02/2024 30 ER CONSTRUCTION & GENERAL ORDER SUPPLIER 2.98 2.95 98.99 50
810 PURBA BARDHAMAN Burdwan Division Augmentation of NAOPARA PWSS for providing Functional Household Tap Connection (FHTC) , SM/09407 Augmentation Work Order for "Road Restoration and other ancilliary works under NAOPARA(SM/09407) water supply scheme under Kalna Sub-Division under Burdwan Division, PHE Dte." Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/001191/2023-2024 2198/KSD 15/03/2024 10 ER CONSTRUCTION & GENERAL ORDER SUPPLIER 1.34 1.12 83.58 50
811 PURBA BARDHAMAN Burdwan Division Augmentation of NAOPARA PWSS for providing Functional Household Tap Connection (FHTC) , SM/09407 Augmentation Work Order for "Ancillary work of Rising Main including Construction of Sluice Valve Chamber & other allied work of Naopara Piped Water Supply Scheme within Kalna Sub-Division under Burdwan Division, PHE Dte." (SL-2) Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/001132/2023-2024 2061/KSD 23/02/2024 20 ER CONSTRUCTION & GENERAL ORDER SUPPLIER 1.69 1.67 98.82 5
812 PURBA BARDHAMAN Burdwan Division Augmentation of NAOPARA PWSS for providing Functional Household Tap Connection (FHTC) , SM/09407 Augmentation Quotation from WBSEDCL for load enhancement charges of Aug Naopara w/s scheme under Burdwan Division, PHE Dte. (Application No.-5004355150)(Ref. ID-500374861) BILL/00903/2024-2025 1047/JJM 30/10/2024 0 WBSEDCL 1.34 0.00 0 0
813 PURBA BARDHAMAN Burdwan Division Augmentation of ground water based SINGI PWSS to accommodate FHTC in Katwa-II block under Katwa Sub Division of Burdwan Division in Purba Bardhaman District , SM/09412 Augmentation Route Survey and preparation of DPR for SINGHI PWSS under Katwa -II Block under Katwa Sub-Division under Burdwan Division PHE Dte. [Sl No-03] Assistant Engineer ORD/000539/2021-2022 54/KTS 25/01/2022 21 RADIANT 2.81 2.81 100 1
814 PURBA BARDHAMAN Burdwan Division Augmentation of ground water based SINGI PWSS to accommodate FHTC in Katwa-II block under Katwa Sub Division of Burdwan Division in Purba Bardhaman District , SM/09412 Augmentation Supply of materials for different water supply scheme under Burdwan Division, PHE Dte. VCH/001578/2021-2022 1207/DW 10/03/2022 0 EXECUTIVE ENGINEER, RESOURCES DIVISION, P.H.E. DTE. 3,005.00 0.00 0 0
815 PURBA BARDHAMAN Burdwan Division Augmentation of ground water based SINGI PWSS to accommodate FHTC in Katwa-II block under Katwa Sub Division of Burdwan Division in Purba Bardhaman District , SM/09412 Augmentation Material Requisition To Resource Division RTOR000150/2021-2022 1239/BWD 07/03/2022 0 Resource Division 4.33 0.00 0 0
816 PURBA BARDHAMAN Burdwan Division Augmentation of ground water based SINGI PWSS to accommodate FHTC in Katwa-II block under Katwa Sub Division of Burdwan Division in Purba Bardhaman District , SM/09412 Augmentation Material Requisition To Resource Division RTOR000050/2021-2022 566/BWD 27/01/2022 0 Resource Division 22.48 0.00 0 0
817 PURBA BARDHAMAN Burdwan Division Augmentation of ground water based SINGI PWSS to accommodate FHTC in Katwa-II block under Katwa Sub Division of Burdwan Division in Purba Bardhaman District , SM/09412 Augmentation Material Requisition To Resource Division RTOR000158/2021-2022 1318/BWD 08/03/2022 0 Resource Division 23.18 0.00 0 0
818 PURBA BARDHAMAN Burdwan Division Augmentation of ground water based SINGI PWSS to accommodate FHTC in Katwa-II block under Katwa Sub Division of Burdwan Division in Purba Bardhaman District , SM/09412 Augmentation Material Requisition To Resource Division RTOR000200/2021-2022 1523/BWD 15/03/2022 0 Resource Division 0.37 0.00 0 0
819 PURBA BARDHAMAN Burdwan Division Augmentation of ground water based SINGI PWSS to accommodate FHTC in Katwa-II block under Katwa Sub Division of Burdwan Division in Purba Bardhaman District , SM/09412 Augmentation Augmentation of Laying Distribution and Rising main Network and Construction of 250 Cum capacity 20 Mtr. staging height RCC Over Head Reservoir including Soil Investigation and pipe connection with cost of pipes, specials and Providing Functional Household Tap Connection (FHTC) from distribution system within the command area of SINGHI Piped Water Supply Scheme under JAL SWAPNA MISSION under Katwa II Block in Purba Bardhaman District under Burdwan Division, PHE. Dte. Assistant Engineer JUNIOR ENGINEER KATWA SUB-DIVISION PHE DTE ORD/000020/2022-2023 2014/BWD 18/04/2022 683 SATYANARAYAN ENGINEERS CO. OP. SOCIETY LTD. 465.17 324.41 69.74 95
820 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap connection (FHTC) by retrofitting within the command area of AJHAPUR Piped Water Supply Scheme at Jamalpur Block under Burdwan Division, P.H.E. DTE. , SM/08701 Retrofitting Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of AJHAPUR Piped Water Supply Scheme and its adjoining mouzas (Vill- Ajhapur, Habitation- Purba Sadipur, Musunda) at Jamalpur Block of Burdwan Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000578/2021-2022 1352/BWD 09/03/2022 45 SUSUNIA GP CO. OPERATIVE LABOUR CONTRACT AND CONSTRUCTION SOCIETY LTD. 41.37 38.97 94.2 1
821 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap connection (FHTC) by retrofitting within the command area of AJHAPUR Piped Water Supply Scheme at Jamalpur Block under Burdwan Division, P.H.E. DTE. , SM/08701 Retrofitting Providing Functional House Hold Tap Connection (FHTC) at Ajhapur village (Habitation,near Head Work Site)under AJHAPUR PWSS at Jamalpur Dev. Block of Burdwan Sub-Division under Burdwan Division,PHE Dte. Gr.D. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000442/2022-2023 1480/BSD 25/08/2022 30 T.K. BANERJEE & CO. 3.33 3.33 100 1
822 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap connection (FHTC) by retrofitting within the command area of AJHAPUR Piped Water Supply Scheme at Jamalpur Block under Burdwan Division, P.H.E. DTE. , SM/08701 Retrofitting Providing Functional Household Tap Connection(FHTC)from existing distribution pipe line system within command area of AJHAPUR Piped W/S Scheme at Ajhapur Habitation (Near Head Works Site), Jamalpur Development Block under Burdwan Division,PHE Dte. Gr.E. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000478/2022-2023 1602/BSD 14/09/2022 30 DEY NIRMAN 4.03 3.92 97.27 1
823 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap connection (FHTC) by retrofitting within the command area of AJHAPUR Piped Water Supply Scheme at Jamalpur Block under Burdwan Division, P.H.E. DTE. , SM/08701 Retrofitting Supply of materials for different water supply schemes under Burdwan Division, PHE Dte. VCH/001555/2021-2022 1194/DW 10/03/2022 0 EXECUTIVE ENGINEER, RESOURCES DIVISION, P.H.E. DTE. 62.76 0.00 0 0
824 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap connection (FHTC) by retrofitting within the command area of AJHAPUR Piped Water Supply Scheme at Jamalpur Block under Burdwan Division, P.H.E. DTE. , SM/08701 Retrofitting Sinking of 300 X 200mm dia Tube Well 150 mtr. Depth by D.R. Rig method using UPVC pipe (CM) and UPVC Medium Well Screen (RMS) of AJHAPUR & its adjoining mouzas Piped Water Supply Scheme, Block - Jamalpur, Dist - Purba Bardhaman under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000545/2022-2023 5124/BWD 21/11/2022 30 SUSUNIA GP CO. OPERATIVE LABOUR CONTRACT AND CONSTRUCTION SOCIETY LTD. 11.24 9.77 86.92 1
825 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap connection (FHTC) by retrofitting within the command area of AJHAPUR Piped Water Supply Scheme at Jamalpur Block under Burdwan Division, P.H.E. DTE. , SM/08701 Retrofitting Extension of pipeline of AJHAPUR Piped Water Supply scheme of Jamalpur Block under Burdwan Sub-Division,under Burdwan Division,PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000581/2022-2023 1978/BSD 17/11/2022 15 DEY NIRMAN 0.51 0.51 100 1
826 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap connection (FHTC) by retrofitting within the command area of AJHAPUR Piped Water Supply Scheme at Jamalpur Block under Burdwan Division, P.H.E. DTE. , SM/08701 Retrofitting Material Requisition To Resource Division RTOR000024/2021-2022 422/BWD 20/01/2022 0 Resource Division 5.49 0.00 0 0
827 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap connection (FHTC) by retrofitting within the command area of AJHAPUR Piped Water Supply Scheme at Jamalpur Block under Burdwan Division, P.H.E. DTE. , SM/08701 Retrofitting Beautification of PWSS with Arboriculture, Recharge Pit including shaft and anciliary works at AJHAPUR (Jamalpur Block) P.W.S.S under Burdwan Division, PHE Dte. Junior Engineer, R.W.S. Burdwan Sub Division, P.H.E. Dt ORD/000545/2024-2025 276/RWS 03/09/2024 10 DEY NIRMAN 0.91 0.00 0 0
828 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap connection (FHTC) by retrofitting within the command area of AJHAPUR Piped Water Supply Scheme at Jamalpur Block under Burdwan Division, P.H.E. DTE. , SM/08701 Retrofitting Construction of Pump House cum chlorine room without sanitary and water supply arrangement at Tube Well Site to departmental drawing no-PHE/BD/P.H/DRG/02/DEC-17(Size 3.60 mtr x 3.00 mtr room) for AJHAPUR its Adjoining Mouza W/S Scheme, Block -Jamalpur within Burdwan Sub-Division, PHE Dte. (Mouza- SALMULA) Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. RWS_JAMALPUR ORD/000841/2022-2023 507/BSD 21/03/2023 45 M/S MA TARA ENTERPRISE 3.29 2.78 84.5 100
829 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap connection (FHTC) by retrofitting within the command area of AJHAPUR Piped Water Supply Scheme at Jamalpur Block under Burdwan Division, P.H.E. DTE. , SM/08701 Retrofitting Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of AJHAPUR Piped Water Supply Scheme at Jamalpur Block under Burdwan Division, PHE Dte. (Agreement No. 46/2020-2021 OF SE/CC/PHE. DTE.) Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. Junior Engineer, R.W.S. Burdwan Sub Division, P.H.E. Dt ORD/000452/2020-2021 4753/BWD 01/12/2020 90 SK ALIM 93.16 45.49 48.83 0
830 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap connection (FHTC) by retrofitting within the command area of AJHAPUR Piped Water Supply Scheme at Jamalpur Block under Burdwan Division, P.H.E. DTE. , SM/08701 Retrofitting Construction of Boundary wall at 4th Tubewell site with Inter Connection and providing FHTC at Mirepara, Adampur, Shalmula Village (Habitation) of AJHAPUR Water Supply Scheme under JAMALPUR Block of Burdwan Division, PHE Dte. AE(HQs) Junior Engineer, Burdwan Division ORD/001040/2023-2024 783/BWD 27/02/2024 30 MUNSHI JAVEDUR JAMAN 14.96 12.75 85.23 100
831 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap connection (FHTC) by retrofitting within the command area of AJHAPUR Piped Water Supply Scheme at Jamalpur Block under Burdwan Division, P.H.E. DTE. , SM/08701 Retrofitting Laying of pipeline for providing FHTC 100% coverage and also construction & installation of Sluice Valve & Valve Chamber to control the flow of water, road restoration work etc. of different Piped W/S Schemes, Block Jamalpur under Burdwan Division, PHE Dte. AE(HQs) Junior Engineer, Burdwan Division ORD/000194/2024-2025 2488/BWD 01/07/2024 550 M/S NATIONAL CONSTRUCTION 480.97 0.00 0 80
832 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap connection (FHTC) by retrofitting within the command area of AJHAPUR Piped Water Supply Scheme at Jamalpur Block under Burdwan Division, P.H.E. DTE. , SM/08701 Retrofitting Conducting physical Household Survey at the IMIS reported village for HGJ certification and providing balance FHTC for Har Ghar Jal certification including conducting Gram Sabhas for different IMIS reported villages across the district under Burdwan Division, PHE Dte. AE(HQs),Assistant Engineer ,Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE.,Assistant Engineer, Durgapur Sub Division, P.H.E. Dte JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000428/2024-2025 3107/BWD 12/08/2024 323 TUBGRAM GRAMMYAK UNNAYAN SAMITY 309.60 0.00 0 85
833 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap connection (FHTC) by retrofitting within the command area of AJHAPUR Piped Water Supply Scheme at Jamalpur Block under Burdwan Division, P.H.E. DTE. , SM/08701 Retrofitting Construction of Boundary wall, Land Development for various PWSS, Block- Jamalpur, District:- Purba-Bardhaman within Burdwan Sub Division under Burdwan Division PHE Dte. AE(HQs),AE(HQs), Burdwan Division, PHE Dte. Junior Engineer, Burdwan Division ORD/001100/2024-2025 433/BWD 20/01/2025 120 RABINDRA NATH GORANG 132.64 0.00 0 40
834 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap connection (FHTC) by retrofitting within the command area of AJHAPUR Piped Water Supply Scheme at Jamalpur Block under Burdwan Division, P.H.E. DTE. , SM/08701 Retrofitting Construction of overhead structure for placing 2 Nos 5000 lit PVC tank including interconnection, Installation of Solar pump, FHTC, LDS & Sinking of 200 mm dia Tube Well 150 mtr. Depth by D.R. Rig method using UPVC pipe at Mohanpur village for AJHAPUR Piped Water Supply Scheme, Block- Jamalpur, District:- Purba-Bardhaman under Burdwan Division PHE Dte. AE(HQs) ORD/001251/2024-2025 817/BWD 04/03/2025 90 UJJWAL MUKHERJEE 23.02 0.00 0 0
835 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap connection (FHTC) by retrofitting within the command area of Antpara Piped Water Supply Scheme at Jamalpur Block under Burdwan Division, P.H.E. DTE. , SM/08703 Retrofitting Functional Household Tap Connection (FHTC) at Baratikra village within the command area of Antpara Piped Water Supply Scheme at Jamalpur Block under Burdwan Division, PHE Dte. (Part-A). AE(HQs) JE/RWS/JAMALPUR ORD/000167/2021-2022 1858/AE/HQ 05/10/2021 30 J. K. CORPORATION 4.83 4.83 100 1
836 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap connection (FHTC) by retrofitting within the command area of Antpara Piped Water Supply Scheme at Jamalpur Block under Burdwan Division, P.H.E. DTE. , SM/08703 Retrofitting Providing Functional Household Tap Connection (FHTC) at Baratikra village within the command area of Antpara Piped Water Supply Scheme at Jamalpur Block under Burdwan Division, PHE Dte. (Part-B). AE(HQs) JE/RWS/JAMALPUR ORD/000168/2021-2022 1859/AE/HQ 05/10/2021 30 INDRAJIT MONDAL 4.83 4.83 100 1
837 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap connection (FHTC) by retrofitting within the command area of Antpara Piped Water Supply Scheme at Jamalpur Block under Burdwan Division, P.H.E. DTE. , SM/08703 Retrofitting Laying of HDPE pipeline at Antpara village for dedicated water supply at Dakshinmohonpur village within Antpara PWSS, Block-Jamalpur under Burdwan Division, PHE Dte. [Group : A] AE(HQs) JE/RWS/JAMALPUR ORD/000455/2021-2022 65/AE/HQ 11/02/2022 30 SUPER SKILL 4.68 4.68 100 1
838 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap connection (FHTC) by retrofitting within the command area of Antpara Piped Water Supply Scheme at Jamalpur Block under Burdwan Division, P.H.E. DTE. , SM/08703 Retrofitting Continuation work order for functional household tap connection (FHTC) at Baratikra village within the command area of Antpara piped water supply scheme at Jamalpur Block under Burdwan Division, PHE Dte.[Part-A][Gr.-D] AE(HQs) JE/RWS/JAMALPUR ORD/000790/2021-2022 1950/AE/HQ 22/12/2021 30 J. K. CORPORATION 4.73 4.73 100 1
839 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap connection (FHTC) by retrofitting within the command area of Antpara Piped Water Supply Scheme at Jamalpur Block under Burdwan Division, P.H.E. DTE. , SM/08703 Retrofitting Hire & fuel charges of vehicle (Car No.-WB-41H-3668) for the office of the Assistant Engineer, RWS Burdwan Sub-Division, PHE Dte. for the month of May & June'22. VCH/000494/2022-2023 462/VEH/22-23 29/08/2022 0 MD HASIN 0.51 0.00 0 0
840 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap connection (FHTC) by retrofitting within the command area of Antpara Piped Water Supply Scheme at Jamalpur Block under Burdwan Division, P.H.E. DTE. , SM/08703 Retrofitting Sinking of 300 X 200mm dia Tube Well 150 mtr. Depth by D.R. Rig method using UPVC pipe (CM) and UPVC Medium Well Screen (RMS) of ANTPARA & its adjoining mouzas Piped Water Supply Scheme, [Nandanpur Vill.] Block ? Jamalpur, Dist - Purba Bardhaman under Burdwan Division, PHE Dte. _2ND CALL. AE(HQs) JE/RWS/JAMALPUR ORD/000566/2022-2023 5275/BWD 30/11/2022 30 SUSUNIA GP CO. OPERATIVE LABOUR CONTRACT AND CONSTRUCTION SOCIETY LTD. 9.45 9.44 99.89 0
841 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap connection (FHTC) by retrofitting within the command area of Antpara Piped Water Supply Scheme at Jamalpur Block under Burdwan Division, P.H.E. DTE. , SM/08703 Retrofitting Extension of pipeline for providing functional house hold tap connection at Dakshin Mohonpur & Uttar Mohanpur habitation under Antpara water supply scheme under Burdwan Division, PHE Dte. AE(HQs) JE/RWS/JAMALPUR ORD/000586/2020-2021 1244/AE/HQ 12/02/2021 30 DIBAKAR SHAW 4.81 1.49 30.98 1
842 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap connection (FHTC) by retrofitting within the command area of Antpara Piped Water Supply Scheme at Jamalpur Block under Burdwan Division, P.H.E. DTE. , SM/08703 Retrofitting Extension of pipeline for providing functional house hold tap connection at Antpara habitation within the command area of Antpara water supply scheme under Burdwan Division, PHE Dte. AE(HQs) JE/RWS/JAMALPUR ORD/000567/2020-2021 1258/AE/HQ 15/02/2021 30 WESTERN WATER SUPPLY AGENCY 4.80 1.46 30.42 1
843 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap connection (FHTC) by retrofitting within the command area of Antpara Piped Water Supply Scheme at Jamalpur Block under Burdwan Division, P.H.E. DTE. , SM/08703 Retrofitting Construction of sluice valve chamber and extension of pipeline for making functional of Household Tap at Daspur village within Antpara piped water supply scheme under Burdwan Division, PHE Dte.[Gr.-A] AE(HQs) JE/RWS/JAMALPUR ORD/000325/2021-2022 1728/AE/HQ 25/08/2021 30 J. K. CORPORATION 1.64 0.00 0 1
844 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap connection (FHTC) by retrofitting within the command area of Antpara Piped Water Supply Scheme at Jamalpur Block under Burdwan Division, P.H.E. DTE. , SM/08703 Retrofitting Providing leftout water tap connection in different villages for 100% coverage to make it Sajal Gram from existing distribution system within scheme jurisdiction of different Piped Water Supply Schemes within Jamalpur Block (Paratal-II, Berugram, Abujhati & Chakdighi G.P.) under Burdwan Division, PHE. Dte. (Part-B). AE(HQs),Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JE/RWS/JAMALPUR ORD/000345/2021-2022 40/BWD 05/01/2022 30 PREMANANDA ROY BISWAS 22.68 0.00 0 1
845 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap connection (FHTC) by retrofitting within the command area of Antpara Piped Water Supply Scheme at Jamalpur Block under Burdwan Division, P.H.E. DTE. , SM/08703 Retrofitting Construction of different dia. Sluice Valve chamber to operate water flow for supplying water in zonal demand basis within command area of Antpara PWSS under Burdwan Division, PHE Dte._Gr-C AE(HQs) JE/RWS/JAMALPUR ORD/000628/2021-2022 125/AE/HQ 04/03/2022 15 SUPER SKILL 4.81 4.81 100 1
846 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap connection (FHTC) by retrofitting within the command area of Antpara Piped Water Supply Scheme at Jamalpur Block under Burdwan Division, P.H.E. DTE. , SM/08703 Retrofitting Laying of uPVC pipe for providing FHTC at Baratikra Village within ANTPARA Piped Water Supply Scheme, Jamalpur Block under Burdwan Division P.H.E Dte. [Group : C] AE(HQs) JE/RWS/JAMALPUR ORD/000036/2022-2023 242/AE/HQ 20/04/2022 30 J. K. CORPORATION 4.58 4.39 95.85 1
847 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap connection (FHTC) by retrofitting within the command area of Antpara Piped Water Supply Scheme at Jamalpur Block under Burdwan Division, P.H.E. DTE. , SM/08703 Retrofitting Repairing and restoration of pipeline besides river bank of Damodar damaged due to construction of retaining wall at Antpara to Dakshinmohanpur within command area of ANTPARA PWSS under Burdwan Division, PHE Dte._Gr-B AE(HQs) JE/RWS/JAMALPUR ORD/000661/2021-2022 134/AE/HQ 11/03/2022 20 SUPER SKILL 4.18 0.00 0 1
848 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap connection (FHTC) by retrofitting within the command area of Antpara Piped Water Supply Scheme at Jamalpur Block under Burdwan Division, P.H.E. DTE. , SM/08703 Retrofitting Providing leftout water tap connection in different villages for 100% coverage to make it Sajal Gram from existing distribution system within scheme jurisdiction of different Piped Water Supply Schemes within Jamalpur Block (Jarogram, Ajhapur, Panchra & Jougram G.P.) under Burdwan Division, PHE. Dte. (Part-A)_2ND CALL. AE(HQs),Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JE/RWS/JAMALPUR ORD/000592/2021-2022 1454/BWD 11/03/2022 30 PREMANANDA ROY BISWAS 18.83 0.00 0 1
849 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap connection (FHTC) by retrofitting within the command area of Antpara Piped Water Supply Scheme at Jamalpur Block under Burdwan Division, P.H.E. DTE. , SM/08703 Retrofitting Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Ramkrishnapur village (Ramkrishnapur Habitation) of Antpara piped water supply scheme within Head Quarters under Burdwan Division, PHE Dte.[Part-A] AE(HQs) JE/RWS/JAMALPUR ORD/000950/2020-2021 1083/BWD 08/02/2021 15 DIBAKAR SHAW 4.78 4.77 99.79 1
850 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap connection (FHTC) by retrofitting within the command area of Antpara Piped Water Supply Scheme at Jamalpur Block under Burdwan Division, P.H.E. DTE. , SM/08703 Retrofitting Laying of uPVC pipe for providing FHTC at Dakshinmohanpur habitation within ANTPARA Piped Water Supply Scheme, Jamalpur Block under Burdwan Division P.H.E Dte._Gr-C AE(HQs) JE/RWS/JAMALPUR ORD/000664/2021-2022 145/AE/HQ 16/03/2022 20 MUKHERJEE ENTERPRISE 4.75 4.68 98.53 1
851 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap connection (FHTC) by retrofitting within the command area of Antpara Piped Water Supply Scheme at Jamalpur Block under Burdwan Division, P.H.E. DTE. , SM/08703 Retrofitting Providing Functional Household Tap Connection (FHTC) at Antpara village within the command area of ANTPARA Piped Water Supply Scheme at Jamalpur Block under Burdwan Division, PHE Dte. [Group : A] AE(HQs) JE/RWS/JAMALPUR ORD/000034/2022-2023 240/AE/HQ 20/04/2022 30 N.S. ENTERPRISE 4.77 3.69 77.36 1
852 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap connection (FHTC) by retrofitting within the command area of Antpara Piped Water Supply Scheme at Jamalpur Block under Burdwan Division, P.H.E. DTE. , SM/08703 Retrofitting Laying of distribution system of different damaged section at Chakundi & Saligram village regarding smooth running FHTC work within Nabastha PWSS, Bardhhaman II Development Block under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. Junior Engineer, Burdwan Sadar Sub-Division ORD/000138/2023-2024 787/BSD 28/04/2023 30 D.M. ENTERPRISE 0.97 0.95 97.94 100
853 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap connection (FHTC) by retrofitting within the command area of Antpara Piped Water Supply Scheme at Jamalpur Block under Burdwan Division, P.H.E. DTE. , SM/08703 Retrofitting Laying of UPVC Pipeline at Daspur Habitation under ANTPARA Piped Water Supply Scheme, Jamalpur Development Block under Burdwan Division, PHE Dte. AE(HQs) J.E. 2 BURDWAN ORD/000409/2023-2024 416/AE/HQ 01/08/2023 30 J K CORPORATION 0.96 0.94 97.92 100
854 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap connection (FHTC) by retrofitting within the command area of Antpara Piped Water Supply Scheme at Jamalpur Block under Burdwan Division, P.H.E. DTE. , SM/08703 Retrofitting Re-Laying of UPVC Pipeline (Damaged by Irrigation Department) at Dakshin Mohanpur Habitation under ANTPARA Piped Water Supply Scheme, Jamalpur Development Block under Burdwan Division, PHE Dte. AE(HQs) J.E. 2 BURDWAN ORD/000407/2023-2024 400/AE/HQ 28/07/2023 30 J K CORPORATION 0.96 0.94 97.92 100
855 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap connection (FHTC) by retrofitting within the command area of Antpara Piped Water Supply Scheme at Jamalpur Block under Burdwan Division, P.H.E. DTE. , SM/08703 Retrofitting Laying UPVC (Damaged By Irrigation Department) pipeline at Uttar Mohanpur habitation, ANTPARA Piped W/S. Scheme, Jamalpur Dev. Block under Burdwan Division, PHE Dte. AE(HQs) Junior Engineer, Burdwan Division ORD/001072/2023-2024 168/AE/HQ 07/03/2024 30 J.K. CORPORATION 0.92 0.92 100 100
856 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap connection (FHTC) by retrofitting within the command area of Antpara Piped Water Supply Scheme at Jamalpur Block under Burdwan Division, P.H.E. DTE. , SM/08703 Retrofitting Re-laying of UPVC (Damaged By WBSRDA Department) pipeline near RAMKRISHNAPUR MONDAL PARA under ANTPARA PWSS, Jamalpur Dev. Block under Burdwan Division, PHE Dte. AE(HQs) Junior Engineer, Burdwan Division ORD/000588/2024-2025 740/AE/HQ 13/09/2024 30 J.K. CORPORATION 0.96 0.96 100 100
857 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap connection (FHTC) by retrofitting within the command area of Antpara Piped Water Supply Scheme at Jamalpur Block under Burdwan Division, P.H.E. DTE. , SM/08703 Retrofitting Laying of UPVC (Damaged By Irrigation Department) pipeline at Daspur & Uttar Mohanpur habitation, ANTPARA Piped W/S. Scheme, Jamalpur Dev. Block under Burdwan Division, PHE Dte. AE(HQs) Junior Engineer, Burdwan Division ORD/001071/2023-2024 167/AE/HQ 07/03/2024 30 J.K. CORPORATION 0.82 0.82 100 100
858 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap connection (FHTC) by retrofitting within the command area of Antpara Piped Water Supply Scheme at Jamalpur Block under Burdwan Division, P.H.E. DTE. , SM/08703 Retrofitting Laying of UPVC (Damaged By Irrigation Department) pipeline near Baratikra Bridge including construction of new valve chamber under ANTPARA Piped W/S. Scheme, Jamalpur Dev. Block under Burdwan Division, PHE Dte. AE(HQs) Junior Engineer, Burdwan Division ORD/001073/2023-2024 169/AE/HQ 07/03/2024 30 J.K. CORPORATION 0.84 0.84 100 100
859 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap connection (FHTC) by retrofitting within the command area of Antpara Piped Water Supply Scheme at Jamalpur Block under Burdwan Division, P.H.E. DTE. , SM/08703 Retrofitting Re-laying of UPVC (Damaged By WBSRDA Department) pipeline near RAMKRISHNAPUR MUSLIM PARA under ANTPARA PWSS, Jamalpur Dev. Block under Burdwan Division, PHE Dte. AE(HQs) Junior Engineer, Burdwan Division ORD/000589/2024-2025 741/AE/HQ 13/09/2024 30 J.K. CORPORATION 0.95 0.95 100 100
860 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap connection (FHTC) by retrofitting within the command area of Antpara Piped Water Supply Scheme at Jamalpur Block under Burdwan Division, P.H.E. DTE. , SM/08703 Retrofitting Construction of Boundary wall, Land Development for various PWSS, Block- Jamalpur, District:- Purba-Bardhaman within Burdwan Sub Division under Burdwan Division PHE Dte. AE(HQs),AE(HQs), Burdwan Division, PHE Dte. Junior Engineer, Burdwan Division ORD/001100/2024-2025 433/BWD 20/01/2025 120 RABINDRA NATH GORANG 132.64 0.00 0 40
861 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap connection (FHTC) by retrofitting within the command area of Antpara Piped Water Supply Scheme at Jamalpur Block under Burdwan Division, P.H.E. DTE. , SM/08703 Retrofitting Re-Laying of U-PVC (Damaged by Irrigation Department) pipeline near Uttar Mahanpur to Dakhin Mahanpur under ANTPARA PWSS, Jamalpur Dev. Block under Burdwan Division, PHE Dte. AE(HQs) ORD/000027/2025-2026 1299/BWD 28/04/2025 90 GOUTAM KUMAR MITRA 9.64 0.00 0 0
862 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap connection (FHTC) by retrofitting within the command area of Antpara Piped Water Supply Scheme at Jamalpur Block under Burdwan Division, P.H.E. DTE. , SM/08703 Retrofitting Laying of uPVC pipe for providing FHTC at Nandanpur Village within ANTPARA Piped Water Supply Scheme, Jamalpur Block under Burdwan Division P.H.E Dte._Gr-D AE(HQs) JE/RWS/JAMALPUR,Junior Engineer, Burdwan Division ORD/000666/2021-2022 146/AE/HQ 16/03/2022 1111 MUNSHI JAVEDUR JAMAN 4.75 0.00 0 100
863 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap connection (FHTC) by retrofitting within the command area of Antpara Piped Water Supply Scheme at Jamalpur Block under Burdwan Division, P.H.E. DTE. , SM/08703 Retrofitting Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Dakshin Mohanpur village (Dakshin Mohanpur Habitation) of Antpara piped water supply scheme within Head Quarters under Burdwan Division, PHE Dte. AE(HQs) JE/RWS/JAMALPUR,Junior Engineer, Burdwan Division ORD/000951/2020-2021 4691/BWD 20/01/2021 809 DIBAKAR SHAW 4.86 4.08 83.95 100
864 PURBA BARDHAMAN Burdwan Division Providing Functional House hold Tap Connection (FHTC) by retrofitting within the command area of Gobindapur piped Water Supply Scheme at Memari-I Block under Burdwan Division, P.H.E. DTE. , SM/08706 Retrofitting Providing FHTC from dist. System within the command area of GOBINDAPUR Piped Water Supply Scheme at Gobindapur (Part), Ichabacha, Taherpur, Dangapara, Purba Kashiara (Part), Matdanga, Chilinda, Sitarampur Village at Memari-I Development Block under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000373/2021-2022 210/BWD 11/01/2022 30 A R TRADERS 28.37 28.37 100 1
865 PURBA BARDHAMAN Burdwan Division Providing Functional House hold Tap Connection (FHTC) by retrofitting within the command area of Gobindapur piped Water Supply Scheme at Memari-I Block under Burdwan Division, P.H.E. DTE. , SM/08706 Retrofitting Emergent 56 Nos. Street Stand Post closed for FHTC Work under Gobindapur Piped Water Supply Scheme (Retro Fittings) under Burdwan Sub-Divn.within Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000582/2022-2023 1974/BSD 16/11/2022 15 A R TRADERS 0.24 0.24 100 1
866 PURBA BARDHAMAN Burdwan Division Providing Functional House hold Tap Connection (FHTC) by retrofitting within the command area of Gobindapur piped Water Supply Scheme at Memari-I Block under Burdwan Division, P.H.E. DTE. , SM/08706 Retrofitting Extension of pipeline for GOBINDAPUR Piped Water Supply Scheme (Gobindapur Ichabacha, Taherpur, Dangapara, Purba Kashiara, Matdanga, Chilinda, Sitarampur village) within MEMARI- I Block including leftout house hold water tap connection (FHTC) under Burdwan Division, PHE. Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. Junior Engineer, RWS, Memari-I Dev. Bolck ORD/000053/2022-2023 2231/BWD 29/04/2022 30 J. K. CORPORATION 18.06 14.53 80.45 90
867 PURBA BARDHAMAN Burdwan Division Providing Functional House hold Tap Connection (FHTC) by retrofitting within the command area of Gobindapur piped Water Supply Scheme at Memari-I Block under Burdwan Division, P.H.E. DTE. , SM/08706 Retrofitting Beautification of PWSS with Land filling and arboriculture of Head Works site & 2nd pump house Gobindapur Pwss under memari-i Development Block under Burdwan Division, PHE Dte. JUNIOR ENGINEER RWS BURDWAN SUB-DIVISION PHE DTE ORD/000547/2024-2025 278/RWS 03/09/2024 10 MUNSHI JAVEDUR JAMAN 0.97 0.00 0 0
868 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap connection (FHTC) by retrofitting within the command area of KAMARHATI Piped Water Supply Scheme at RAINA-II Block under Burdwan Division, P.H.E. DTE. , SM/08709 Retrofitting Water tap connection in each house hold from existing dist. System within Scheme jurisdiction in Katshimul village (Part) of Kamarhati (Zone-II) piped water supply scheme within Burdwan Sub-Division PHE Dte Part-A.Gr. D. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000214/2021-2022 1476/BSD 09/11/2021 30 MUNSHI JAVEDUR JAMAN 4.83 4.83 100 1
869 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap connection (FHTC) by retrofitting within the command area of KAMARHATI Piped Water Supply Scheme at RAINA-II Block under Burdwan Division, P.H.E. DTE. , SM/08709 Retrofitting Water tap connection in each house hold from existing dist. System within Scheme jurisdiction in Katshimul village (Part) of Kamarhati (Zone-II) piped water supply scheme within Burdwan Sub-Division PHE Dte Part-B..Gr. E. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000215/2021-2022 1477/BSD 09/11/2021 30 DUBE ENTERPRISE 4.83 4.80 99.38 1
870 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap connection (FHTC) by retrofitting within the command area of KAMARHATI Piped Water Supply Scheme at RAINA-II Block under Burdwan Division, P.H.E. DTE. , SM/08709 Retrofitting Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of Kamarhati Z-II Piped Water Supply Scheme at Gotan, Kamarhati & Jashapur Village (Mouza), Raina-II Block under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000235/2021-2022 6535/BWD 24/11/2021 60 KOUSIK MALLICK 71.10 66.22 93.14 1
871 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap connection (FHTC) by retrofitting within the command area of KAMARHATI Piped Water Supply Scheme at RAINA-II Block under Burdwan Division, P.H.E. DTE. , SM/08709 Retrofitting Continuation work order for Water tap connection in each house hold from existing dist. System within Scheme jurisdiction in Katshimul village (Part) of Kamarhati (Zone-II) piped water supply scheme within Burdwan Sub-Division PHE Dte Part-A.Gr. D. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000307/2021-2022 1686/BSD 17/12/2021 30 MUNSHI JAVEDUR JAMAN 4.83 4.83 100 1
872 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap connection (FHTC) by retrofitting within the command area of KAMARHATI Piped Water Supply Scheme at RAINA-II Block under Burdwan Division, P.H.E. DTE. , SM/08709 Retrofitting Continuation work order for Water tap connection in each house hold from existing dist. System within Scheme jurisdiction in Katshimul village (Part) of Kamarhati (Zone-II) piped water supply scheme within Burdwan Sub-Division PHE Dte Part-B..Gr. E. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000308/2021-2022 1685/BSD 17/12/2021 30 DUBE ENTERPRISE 4.83 4.83 100 1
873 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap connection (FHTC) by retrofitting within the command area of KAMARHATI Piped Water Supply Scheme at RAINA-II Block under Burdwan Division, P.H.E. DTE. , SM/08709 Retrofitting Extension of pipeline for KAMARHATI Water Supply Scheme FOR FHTC work at Kamarhati village within Raina-II Block , under Burdwan Division, PHE Dte. (Zone-II). Gr.A. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000549/2021-2022 369/BSD 02/03/2022 30 DUBE ENTERPRISE 4.98 4.97 99.8 1
874 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap connection (FHTC) by retrofitting within the command area of KAMARHATI Piped Water Supply Scheme at RAINA-II Block under Burdwan Division, P.H.E. DTE. , SM/08709 Retrofitting Extension of pipeline for KAMARHATI Water Supply Scheme FOR FHTC work at Jashapur village within Raina-II Block , under Burdwan Division, PHE Dte.Gr.C. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000465/2021-2022 276/BSD 15/02/2022 30 KOUSIK MALLICK 4.99 4.98 99.8 1
875 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap connection (FHTC) by retrofitting within the command area of KAMARHATI Piped Water Supply Scheme at RAINA-II Block under Burdwan Division, P.H.E. DTE. , SM/08709 Retrofitting Laying pipeline with FHTC for KAMARHATI Zone -II Water Supply Scheme at Kamarhati village (95 Nos.), Barati village (155 Nos.), Baidyapur village (110 Nos.), Jashapur village (125 Nos.) of Raina-II Block under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000164/2022-2023 3166/BWD 21/07/2022 45 ANWESHA CONSTRUCTION 31.48 31.37 99.65 1
876 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap connection (FHTC) by retrofitting within the command area of KAMARHATI Piped Water Supply Scheme at RAINA-II Block under Burdwan Division, P.H.E. DTE. , SM/08709 Retrofitting FHTC for Kamarhati (Zone-II) Water Supply Scheme at Kamarhati Village (36 Nos) of Raina II Block under Burdwan Division, PHE Dte [For 100% FHTC at Kamarhati Village (Harghar Jal). Gr.J Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000342/2022-2023 1367/BSD 04/08/2022 5 ANWESHA CONSTRUCTION 0.98 0.00 0 1
877 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap connection (FHTC) by retrofitting within the command area of KAMARHATI Piped Water Supply Scheme at RAINA-II Block under Burdwan Division, P.H.E. DTE. , SM/08709 Retrofitting Extension of pipeline for KAMARHATI Water Supply Scheme FOR FHTC work at Barati and Badyapur village within Raina-II Block , under Burdwan Division, PHE Dte(Zone-II). Gr.D. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000442/2021-2022 200/BSD 01/02/2022 30 ARISTOCON ENGINEERS CO-OP SOCIETY LTD 4.80 4.74 98.75 1
878 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap connection (FHTC) by retrofitting within the command area of KAMARHATI Piped Water Supply Scheme at RAINA-II Block under Burdwan Division, P.H.E. DTE. , SM/08709 Retrofitting 225mm.Dia UPVC Pipeline at Node 11A to 11B of KAMARHATI(Zone-I)Water Supply Scheme within Raina-II Block , under Burdwan Division, PHE Dte. Gr.B. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000387/2021-2022 58/BSD 13/01/2022 30 INDIAN ENGINEERS CO.-OPERATIVE SOCIETY LTD. 2.99 0.00 0 1
879 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap connection (FHTC) by retrofitting within the command area of KAMARHATI Piped Water Supply Scheme at RAINA-II Block under Burdwan Division, P.H.E. DTE. , SM/08709 Retrofitting 225mm.Dia UPVC Pipeline at Node 86C-92,86-B-86C,86-A-86B,10-11-53-53A of KAMARHATI(Zone-I)Water Supply Scheme within Raina-II Block , under Burdwan Division, PHE Dte. Gr.C. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000388/2021-2022 59/BSD 13/01/2022 30 INDIAN ENGINEERS CO.-OPERATIVE SOCIETY LTD. 3.96 3.92 98.99 1
880 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap connection (FHTC) by retrofitting within the command area of KAMARHATI Piped Water Supply Scheme at RAINA-II Block under Burdwan Division, P.H.E. DTE. , SM/08709 Retrofitting Formal Work Order for Laying distribution system including providing house connection at Nizampur, Daminya village (Mouza) of KAMARHATI Piped W/S. Scheme (Zone-I) at Raina - II Block under Burdwan Division, PHE. Dte.(Part-B) _2ND CALL. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000934/2020-2021 1601/BWD 22/02/2021 90 INDIAN ENGINEERS CO.-OPERATIVE SOCIETY LTD. 184.73 168.79 91.37 100
881 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap connection (FHTC) by retrofitting within the command area of KAMARHATI Piped Water Supply Scheme at RAINA-II Block under Burdwan Division, P.H.E. DTE. , SM/08709 Retrofitting Extension of pipeline for KAMARHATI Water Supply Scheme FOR FHTC work at Kamarhati village (Purba para,Pal para,Kana para,Pandit para, pashim para)within Raina-II Block, under Burdwan Division, PHE Dte. Gr.B. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000031/2022-2023 678/BSD 22/04/2022 30 BAMDEB CONSTRUCTION & CO 2.84 2.83 99.65 1
882 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap connection (FHTC) by retrofitting within the command area of KAMARHATI Piped Water Supply Scheme at RAINA-II Block under Burdwan Division, P.H.E. DTE. , SM/08709 Retrofitting Extension of pipeline for KAMARHATI Water Supply Scheme FOR FHTC work at GOTAN village within Raina II Block, under Burdwan Division, PHE Dte. Gr.A. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000674/2021-2022 534/BSD 28/03/2022 30 KOUSIK MALLICK 4.96 4.96 100 1
883 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap connection (FHTC) by retrofitting within the command area of KAMARHATI Piped Water Supply Scheme at RAINA-II Block under Burdwan Division, P.H.E. DTE. , SM/08709 Retrofitting Bullah pilling (92.0 mtr) at HD Works Site(North,East & South) for protection of Boundary wall beside irrigation canel of KAMARHATI ZONE-II W/S Scheme of RAINA-II Block at Burdwan Sub -Division within Burdwan Division, PHE Dte. Dist.-Purba Bardhaman.Gr.B. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000644/2021-2022 468/BSD 21/03/2022 15 JMD ENGINEERING INFRASTRUCTURE COMPANY 4.61 0.00 0 1
884 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap connection (FHTC) by retrofitting within the command area of KAMARHATI Piped Water Supply Scheme at RAINA-II Block under Burdwan Division, P.H.E. DTE. , SM/08709 Retrofitting Laying of interconnection of the Pump No.-1 & 2 with OHR and distribution main of 300 mm dia for Kamarhati (Zone-II) piped water supply scheme within Raina-II Block under Burdwan Division, PHE Dte.[Gr.-H] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000690/2021-2022 959/BSD 23/07/2021 30 JMD ENGINEERING INFRASTRUCTURE COMPANY 4.80 0.00 0 1
885 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap connection (FHTC) by retrofitting within the command area of KAMARHATI Piped Water Supply Scheme at RAINA-II Block under Burdwan Division, P.H.E. DTE. , SM/08709 Retrofitting Pipeline with FHTC for KAMARHATI ZONE -II Water Supply Scheme at Kamarhati village(80 NOS) of Raina-II Block,under Burdwan Division, PHE Dte. Group : C. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000111/2022-2023 1016/BSD 20/06/2022 30 D.M. ENTERPRISE 4.94 4.91 99.39 1
886 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap connection (FHTC) by retrofitting within the command area of KAMARHATI Piped Water Supply Scheme at RAINA-II Block under Burdwan Division, P.H.E. DTE. , SM/08709 Retrofitting Pipeline with FHTC for KAMARHATI ZONE -II Water Supply Scheme at Kamarhati village (52 Nos.) of Raina-II Block,under Burdwan Division, PHE Dte. Group : A. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000113/2022-2023 1035/BSD 20/06/2022 30 KOUSIK MALLICK 4.96 4.80 96.77 1
887 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap connection (FHTC) by retrofitting within the command area of KAMARHATI Piped Water Supply Scheme at RAINA-II Block under Burdwan Division, P.H.E. DTE. , SM/08709 Retrofitting Pipeline with FHTC for KAMARHATI ZONE -II Water Supply Scheme at Kamarhati village(70 NOS) of Raina-II Block,under Burdwan Division, PHE Dte. Group : B. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000110/2022-2023 1015/BSD 20/06/2022 30 KONAR ENTERPRISE 4.95 4.85 97.98 1
888 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap connection (FHTC) by retrofitting within the command area of KAMARHATI Piped Water Supply Scheme at RAINA-II Block under Burdwan Division, P.H.E. DTE. , SM/08709 Retrofitting Land Development(at entrance)of Head Works Site of of KAMARHATI ZONE-II PIPED Water Supply Scheme at RAINA-II Block within Burdwan Sub-Division under Burdwan Division, PHE Dte. Group : F. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000108/2022-2023 988/BSD 16/06/2022 15 JMD ENGINEERING INFRASTRUCTURE COMPANY 1.85 0.00 0 1
889 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap connection (FHTC) by retrofitting within the command area of KAMARHATI Piped Water Supply Scheme at RAINA-II Block under Burdwan Division, P.H.E. DTE. , SM/08709 Retrofitting FHTC for KAMARHATI (Zone-II] Water Supply Scheme at Kamarhati village (36 Nos) of Raina-II Block under Burdwan Division, PHE Dte. [for 100% FHTC at Kamarhati village (Harghar Jal)] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000653/2022-2023 1367-A/BSD 04/08/2022 5 ANWESHA CONSTRUCTION 0.98 0.98 100 1
890 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Krishnabati Piped Water Supply Scheme at Purbasthali-II Block , SM/07827 Retrofitting Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of Krishnabati Piped Water Supply Scheme at Bahara (3 Nos Habitation), Chak Bahara (Natungram Habitation), Chandanpur Simuldanga & Krishnabati (2 Nos Habitation) Village (Mouza), Mangalkot Block under Burdwan Division, PHE Dte. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000088/2021-2022 3592/BWD 13/07/2021 60 H SAMANTA 84.33 73.70 87.39 100
891 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Krishnabati Piped Water Supply Scheme at Purbasthali-II Block , SM/07827 Retrofitting NAME OF THE WORK -RESTORATION WORK OF BIDYANAGAR TO VIA DAMODAR PARA TO BOGPUR ROAD,PACKAGE NO-WB-22-27,BLOCK-PURBASTHALI-1,GP-SRIRAMPUR & JAHANNAGAR. BILL/00739/2024-2025 893/JJM 25/09/2024 0 EXECUTIVE ENGINEER (WBSRDA) PURBA BARDHAMAN DIVISION 5.21 0.00 0 0
892 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Krishnabati Piped Water Supply Scheme at Purbasthali-II Block , SM/07827 Retrofitting Quotation from WBSEDCL for new service connection charges of Krishnabati w/s scheme under Burdwan Division, PHE Dte. (Application No.-5004422952)(Ref. ID-503758136) BILL/00902/2024-2025 1048/JJM 30/10/2024 0 WBSEDCL 7.08 0.00 0 0
893 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Krishnabati Piped Water Supply Scheme at Purbasthali-II Block , SM/07827 Retrofitting Different Types of work involved in connection with Augmentation of 6 Nos. [(SM/07827), (SM/07866), (SM/16196), (SM/18314), (SM/16021), (SM/16019)] Piped Water Supply Scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/001144/2024-2025 618/BWD 11/02/2025 180 M/S DATTA ENTERPRISE 578.09 0.00 0 0
894 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Krishnabati Piped Water Supply Scheme at Purbasthali-II Block , SM/07827 Retrofitting Different types of works involve in connection with Augmentation of KRISHNABATI (SM/07827), PURBASTHLI (SM/07866), SINHARI (SM/09716) & SURFACE based W/S Scheme (SM/15571) Piped water supply scheme under Purbasthali-II Block, Kalna Sub-Division, PHE Dte. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000181/2024-2025 2296/BWD 20/06/2024 616 M/S DATTA ENTERPRISE 579.85 34.32 5.92 2
895 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) retrofitting in the command area of of Nabagram Piped Water Supply Scheme at Jamalpur Block , SM/08101 Retrofitting Construction of boundary wall (Back side of OHR) including land development & Pumping out of water at Pump house no - 1 Site of Nabagram Water Supply Scheme under Jamalpur Dev. Block of Burdwan Division, PHE Dte. (Length -50.00 Mtr, Col-20 Nos). Gr.G. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000659/2021-2022 472/BSD 21/03/2022 45 MOHAMMAD ISSA 3.77 0.00 0 1
896 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) retrofitting in the command area of of Nabagram Piped Water Supply Scheme at Jamalpur Block , SM/08101 Retrofitting Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of Nabagram Piped Water Supply Scheme at Ajhapur (Part) (Masagram Habitation), Village (Mouza), Jamalpur Block under Burdwan Division, PHE Dte. (Agreement No. 115/2020-2021 OF SE/CC/PHE. DTE.) Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000440/2020-2021 1402/BWD 15/02/2021 60 M/S ASHA CONSTRUCTION 67.11 94.19 140.35 1
897 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) retrofitting in the command area of of Nabagram Piped Water Supply Scheme at Jamalpur Block , SM/08101 Retrofitting Formal Work Order for Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of Nabagram Piped Water Supply Scheme at Ajhapur (Part) (Ajhapur Habitation), Village (Mouza), Jamalpur Block under Burdwan Division, PHE Dte. (Agreement no. 116/SE/CC/PHE/Dte of 2020-2021) Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. Junior Engineer, R.W.S. Burdwan Sub Division, P.H.E. Dt ORD/000470/2020-2021 1515/BWD 19/02/2021 60 S.S. CONSTRUCTION 75.65 150.48 198.92 0
898 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) retrofitting in the command area of of Nabagram Piped Water Supply Scheme at Jamalpur Block , SM/08101 Retrofitting Providing FHTC for 100% coverage at Nabagram, Basishta Pur, Keliri, Ajhapur & Dattapur Mouza (Village) for NABAGRAM Piped W/S Scheme, Jamalpur Dev. Block under Burdwan Division, PHE Dte. AE(HQs) RWS_JAMALPUR ORD/000570/2023-2024 3716/BWD 24/08/2023 30 M/S UNIQUE 23.77 23.65 99.5 50
899 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) retrofitting in the command area of of Nabagram Piped Water Supply Scheme at Jamalpur Block , SM/08101 Retrofitting Laying of pipeline for providing FHTC 100% coverage and also construction & installation of Sluice Valve & Valve Chamber to control the flow of water, road restoration work etc. of different Piped W/S Schemes, Block Jamalpur under Burdwan Division, PHE Dte. AE(HQs) Junior Engineer, Burdwan Division ORD/000194/2024-2025 2488/BWD 01/07/2024 550 M/S NATIONAL CONSTRUCTION 480.97 0.00 0 80
900 PURBA BARDHAMAN Burdwan Division Augmentation of ground water based KAITY PWSS to accommodate FHTC in Raina-II block under Burdwan Sub Division of Burdwan Division in Purba Bardhaman District , SM/10130 Augmentation Route Survey & Preparation of DPR for Kaity W/S Scheme under Raina-II Block under Burdwan Sub-Division under Burdwan Division PHE Dte. Sl No.16. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000505/2021-2022 191/BSD 31/01/2022 30 RADIANT 3.43 3.42 99.71 1
901 PURBA BARDHAMAN Burdwan Division Augmentation of ground water based KAITY PWSS to accommodate FHTC in Raina-II block under Burdwan Sub Division of Burdwan Division in Purba Bardhaman District , SM/10130 Augmentation Quotation for shifting of 25 KVA DTR along with 11 KV HTOH Kaity Feeder at Kaity PHE campus under Madhabdihi-CCC. [Ref Id-860252403] VCH/000627/2022-2023 726/DW/22-23 03/11/2022 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LTD. 1.71 0.00 0 0
902 PURBA BARDHAMAN Burdwan Division Augmentation of ground water based KAITY PWSS to accommodate FHTC in Raina-II block under Burdwan Sub Division of Burdwan Division in Purba Bardhaman District , SM/10130 Augmentation Supply of materials for different water supply scheme under Burdwan Division, PHE Dte. VCH/001578/2021-2022 1207/DW 10/03/2022 0 EXECUTIVE ENGINEER, RESOURCES DIVISION, P.H.E. DTE. 3,005.00 0.00 0 0
903 PURBA BARDHAMAN Burdwan Division Augmentation of ground water based KAITY PWSS to accommodate FHTC in Raina-II block under Burdwan Sub Division of Burdwan Division in Purba Bardhaman District , SM/10130 Augmentation Sinking of 300 X 200mm dia Tube Well 150 mtr. Depth by D.R. Rig method using UPVC pipe (CM) and UPVC Medium Well Screen (RMS) for 3rd TW Site of Aug. KAITY & its adjoining mouzas Piped Water Supply Scheme, Block ¿ Raina ¿ II, Dist - Purba Bardhaman under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000569/2022-2023 5281/BWD 01/12/2022 30 MUNSHI ENTERPRISE 11.34 0.00 0 0
904 PURBA BARDHAMAN Burdwan Division Augmentation of ground water based KAITY PWSS to accommodate FHTC in Raina-II block under Burdwan Sub Division of Burdwan Division in Purba Bardhaman District , SM/10130 Augmentation Sinking of 300 X 200mm dia Tube Well 150 mtr. Depth by D.R. Rig method using UPVC pipe (CM) and UPVC Medium Well Screen (RMS) for Augmentation of KAITY & its adjoining mouzas Piped Water Supply Scheme, Block - Raina - II, Dist - Purba Bardhaman under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000538/2022-2023 5026/BWD 10/11/2022 30 M/S D. PALIT & CO. 10.06 8.33 82.8 1
905 PURBA BARDHAMAN Central Mechanical Augmentation of ground water based KAITY PWSS to accommodate FHTC in Raina-II block under Burdwan Sub Division of Burdwan Division in Purba Bardhaman District , SM/10130 Augmentation Supply & Installation of Submersible Pumping Machinery , Voltage Stabilizer, Chlorination system and internal House wiring of Tube Well No- 01 & 02 at Augmentation Kaity [Block ¿Raina-II] Water Supply Scheme under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000918/2022-2023 1082/CMD 03/03/2023 30 JOYGURU ENTERPRISE 12.31 11.96 97.16 100
906 PURBA BARDHAMAN Burdwan Division Augmentation of ground water based KAITY PWSS to accommodate FHTC in Raina-II block under Burdwan Sub Division of Burdwan Division in Purba Bardhaman District , SM/10130 Augmentation Construction of Pump House cum chlorine room without sanitary and water supply arrangement at Tube Well Site to departmental drawing no-PHE/BD/P.H/DRG/02/DEC-17(Size 3.60 mtr x 3.00 mtr room) for KAITY its Adjoining Mouza W/S Scheme, Block -Raina-II within Burdwan Sub-Division, PHE Dte. (Mouza- DURGABATI) Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000768/2022-2023 503/BSD 21/03/2023 45 DEBJYOTI GOSWAMI 3.61 2.85 78.95 100
907 PURBA BARDHAMAN Central Mechanical Augmentation of ground water based KAITY PWSS to accommodate FHTC in Raina-II block under Burdwan Sub Division of Burdwan Division in Purba Bardhaman District , SM/10130 Augmentation Installation of Electro-mechanical accessories at Kaity PH-1 (replacement T.W) Water Supply Scheme under CMD, PHE Dte., Dist.- Purba-Bardhaman ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000993/2023-2024 4352/CMD 20/09/2023 30 MITRA ENTERPRISE 3.28 3.28 100 100
908 PURBA BARDHAMAN Burdwan Division Augmentation of ground water based KAITY PWSS to accommodate FHTC in Raina-II block under Burdwan Sub Division of Burdwan Division in Purba Bardhaman District , SM/10130 Augmentation Material Requisition To Resource Division RTOR000190/2021-2022 1385/BWD 09/03/2022 0 Resource Division 4.26 0.00 0 0
909 PURBA BARDHAMAN Burdwan Division Augmentation of ground water based KAITY PWSS to accommodate FHTC in Raina-II block under Burdwan Sub Division of Burdwan Division in Purba Bardhaman District , SM/10130 Augmentation Material Requisition To Resource Division RTOR000228/2021-2022 1550/BWD 15/03/2022 0 Resource Division 0.37 0.00 0 0
910 PURBA BARDHAMAN Burdwan Division Augmentation of ground water based KAITY PWSS to accommodate FHTC in Raina-II block under Burdwan Sub Division of Burdwan Division in Purba Bardhaman District , SM/10130 Augmentation 02 Nos. Quotation for new connection of WBSEDCL of Augmentation of Kaity water supply scheme. BILL/00195/2023-2024 302/JJM/23-24 28/06/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LTD. 12.21 0.00 0 0
911 PURBA BARDHAMAN Burdwan Division Augmentation of ground water based KAITY PWSS to accommodate FHTC in Raina-II block under Burdwan Sub Division of Burdwan Division in Purba Bardhaman District , SM/10130 Augmentation Augmentation of KAITY Piped Water Supply Scheme with LDS, FHTC, Rising main, Construction of 700 cum capacity OHR with 20.0 mtr. Staging height inclusive of soil investigation under RAINA- II Block, District:- Purba-Burdwan. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000124/2022-2023 2930/BWD 28/06/2022 365 SK ALIM 689.36 688.91 99.93 100
912 PURBA BARDHAMAN Burdwan Division Augmentation of ground water based KAITY PWSS to accommodate FHTC in Raina-II block under Burdwan Sub Division of Burdwan Division in Purba Bardhaman District , SM/10130 Augmentation Allied works for Augmentation of KAITY W/S Scheme under Burdwan Division, PHE. Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000345/2023-2024 3034/BWD 14/07/2023 90 SK ALIM 122.65 114.07 93 100
913 PURBA BARDHAMAN Burdwan Division Augmentation of ground water based KAITY PWSS to accommodate FHTC in Raina-II block under Burdwan Sub Division of Burdwan Division in Purba Bardhaman District , SM/10130 Augmentation Laying Distribution for FHTC work including laying of parallel line for KAITY Piped Water Supply Scheme and its adjoining mouzas within RAINA-II BLOCK under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/001029/2024-2025 143/BWD 08/01/2025 90 M/S ANAND CONSTRUCTION 19.77 0.00 0 0
914 PURBA BARDHAMAN Burdwan Division Augmentation of ground water based KAITY PWSS to accommodate FHTC in Raina-II block under Burdwan Sub Division of Burdwan Division in Purba Bardhaman District , SM/10130 Augmentation Conducting physical Household Survey at the IMIS reported village for HGJ certification and providing balance FHTC for Har Ghar Jal certification including conducting Gram Sabhas for different IMIS reported villages across the district under Burdwan Division, PHE Dte. AE(HQs),Assistant Engineer ,Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE.,Assistant Engineer, Durgapur Sub Division, P.H.E. Dte JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000428/2024-2025 3107/BWD 12/08/2024 323 TUBGRAM GRAMMYAK UNNAYAN SAMITY 309.60 0.00 0 85
915 PURBA BARDHAMAN Burdwan Division Providing Functional House hold Tap Connection (FHTC) by retrofitting at Kaichar, Sitalgram, Haripur and Mathrun mouzas within the command area of Jageswardihi piped Water Supply Scheme at Mangolkote Block under Burdwan Division, P.H.E. DTE. (Pt.-B) , SM/08707 Retrofitting Providing Functional Household Tap Connection from existing distribution system within the command area of JAGGESWARDIHI PWSS under Sitalgram village under Mongalkote Block within Katwa Sub-Division under Burdwan Division PHE Dte. Assistant Engineer ORD/000163/2022-2023 3150/BWD 20/07/2022 30 BAMDEB CONSTRUCTION & CO 15.40 13.71 89.03 1
916 PURBA BARDHAMAN Burdwan Division Providing Functional House hold Tap Connection (FHTC) by retrofitting at Kaichar, Sitalgram, Haripur and Mathrun mouzas within the command area of Jageswardihi piped Water Supply Scheme at Mangolkote Block under Burdwan Division, P.H.E. DTE. (Pt.-B) , SM/08707 Retrofitting Extension of pipeline from the existing distribution system within scheme jurisdiction at Kanaidanga under Jaggeswardihi piped water supply scheme under Mongalkote Block within Katwa Sub-Division under Burdwan Division, PHE Dte. [Phase-2] Assistant Engineer JUNIOR ENGINEER R.W.S. BURDWAN SUB-DIVISION PHE DTE ORD/000830/2020-2021 82/KTS 09/02/2021 15 HAMID SK 1.25 0.00 0 1
917 PURBA BARDHAMAN Burdwan Division Providing Functional House hold Tap Connection (FHTC) by retrofitting at Kaichar, Sitalgram, Haripur and Mathrun mouzas within the command area of Jageswardihi piped Water Supply Scheme at Mangolkote Block under Burdwan Division, P.H.E. DTE. (Pt.-B) , SM/08707 Retrofitting Providing leftout water tap connection in different villages for 100% coverage to make it Sajal Gram from existing distribution system within scheme jurisdiction of different Piped Water Supply Schemes within Mongalkote Block under Burdwan Division, PHE. Dte. Assistant Engineer ORD/000407/2021-2022 284/BWD 17/01/2022 30 BABUL SK 6.81 4.00 58.74 1
918 PURBA BARDHAMAN Burdwan Division Providing Functional House hold Tap Connection (FHTC) by retrofitting at Kaichar, Sitalgram, Haripur and Mathrun mouzas within the command area of Jageswardihi piped Water Supply Scheme at Mangolkote Block under Burdwan Division, P.H.E. DTE. (Pt.-B) , SM/08707 Retrofitting Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of Jageswardihi Piped Water Supply Scheme at Kaichar & Sitalgram Village (Mouza), Mongolkot Block under Burdwan Division, PHE Dte. Assistant Engineer ORD/000258/2021-2022 6694/BWD 01/12/2021 60 HAMID SK 58.77 17.29 29.42 1
919 PURBA BARDHAMAN Burdwan Division Providing Functional House hold Tap Connection (FHTC) by retrofitting at Kaichar, Sitalgram, Haripur and Mathrun mouzas within the command area of Jageswardihi piped Water Supply Scheme at Mangolkote Block under Burdwan Division, P.H.E. DTE. (Pt.-B) , SM/08707 Retrofitting Surging of existing tube well at 1st , 2nd and 3rd Tube Well Site at Jaggeswardihi under Jaggeswardihi Piped Water Supply Scheme under Mongalkote Block under Katwa Sub-Division within Burdwan Division, P.H.E.Dte [Sl No-02] Assistant Engineer ORD/000594/2021-2022 149/KTS 23/02/2022 15 PARTHA PRATIM ACHARYA 1.03 1.03 100 1
920 PURBA BARDHAMAN Burdwan Division Providing Functional House hold Tap Connection (FHTC) by retrofitting at Kaichar, Sitalgram, Haripur and Mathrun mouzas within the command area of Jageswardihi piped Water Supply Scheme at Mangolkote Block under Burdwan Division, P.H.E. DTE. (Pt.-B) , SM/08707 Retrofitting Extension of pipe line from the existing Distribution System within scheme jurisdiction at Jaggeswardihi village under Jaggeswardihi PWSS under Katwa Sub-Division under Burdwan Division PHE Dte.. [Sl No-03] Assistant Engineer ORD/000606/2021-2022 170/KTS 25/02/2022 7 BABUL SK 2.05 2.02 98.54 1
921 PURBA BARDHAMAN Burdwan Division Providing Functional House hold Tap Connection (FHTC) by retrofitting at Kaichar, Sitalgram, Haripur and Mathrun mouzas within the command area of Jageswardihi piped Water Supply Scheme at Mangolkote Block under Burdwan Division, P.H.E. DTE. (Pt.-B) , SM/08707 Retrofitting Sinking of 300 X 200mm dia Tube Well 200 mtr. Depth by D.R. Rig method using UPVC pipe (CM) and UPVC Medium Well Screen (RMS) for Augmentation of JAGGESWARDIHI and its adjoining mouzas Piped Water Supply Scheme, Block Mongalkote, Dist - Purba Bardhaman under Burdwan Division, PHE Dte. Assistant Engineer ORD/000535/2022-2023 4959/BWD 09/11/2022 30 ANIRUDDHA FARUQUE 13.08 9.22 70.49 1
922 PURBA BARDHAMAN Burdwan Division Providing Functional House hold Tap Connection (FHTC) by retrofitting at Kaichar, Sitalgram, Haripur and Mathrun mouzas within the command area of Jageswardihi piped Water Supply Scheme at Mangolkote Block under Burdwan Division, P.H.E. DTE. (Pt.-B) , SM/08707 Retrofitting Extension of pipe line at Kaichar Paschim Para from the existing Distribution System within scheme jurisdiction under Jaggeswardihi PWSS under Mongalkote Block under Katwa Sub-Division under Burdwan Division PHE Dte. [Sl No-06] Assistant Engineer ORD/000609/2021-2022 173/KTS 25/02/2022 15 BABUL SK 4.67 4.67 100 1
923 PURBA BARDHAMAN Burdwan Division Providing Functional House hold Tap Connection (FHTC) by retrofitting at Kaichar, Sitalgram, Haripur and Mathrun mouzas within the command area of Jageswardihi piped Water Supply Scheme at Mangolkote Block under Burdwan Division, P.H.E. DTE. (Pt.-B) , SM/08707 Retrofitting Extension of pipe line at Kaichar Khane Para from the existing Distribution System within scheme jurisdiction under Jaggeswardihi PWSS under Mongalkote Block under Katwa Sub-Division under Burdwan Division PHE Dte. [Sl No-04] Assistant Engineer ORD/000607/2021-2022 171/KTS 25/02/2022 15 BABUL SK 4.64 4.64 100 1
924 PURBA BARDHAMAN Burdwan Division Providing Functional House hold Tap Connection (FHTC) by retrofitting at Kaichar, Sitalgram, Haripur and Mathrun mouzas within the command area of Jageswardihi piped Water Supply Scheme at Mangolkote Block under Burdwan Division, P.H.E. DTE. (Pt.-B) , SM/08707 Retrofitting Quotation from WBSEDCL for additional T/W at Jaggeswardihi w/s scheme under Burdwan Division, PHE Dte. BILL/00895/2024-2025 1035/JJM 25/10/2024 0 WBSEDCL 3.22 0.00 0 0
925 PURBA BARDHAMAN Burdwan Division Providing Functional House hold Tap Connection (FHTC) by retrofitting at Kaichar, Sitalgram, Haripur and Mathrun mouzas within the command area of Jageswardihi piped Water Supply Scheme at Mangolkote Block under Burdwan Division, P.H.E. DTE. (Pt.-B) , SM/08707 Retrofitting Construction of Pump House, Boundary walls and Raising Main for Aug. of JAGGESWARDIHI Piped Water Supply Scheme under Mongalkote Block, District:- Purba-Bardhaman. Assistant Engineer JUNIOR ENGINEER R.W.S. BURDWAN SUB-DIVISION PHE DTE ORD/000922/2023-2024 5494/BWD 13/12/2023 385 PAPRI HAZRA 10.13 7.39 72.95 75
926 PURBA BARDHAMAN Burdwan Division Providing Functional House hold Tap Connection (FHTC) by retrofitting at Kaichar, Sitalgram, Haripur and Mathrun mouzas within the command area of Jageswardihi piped Water Supply Scheme at Mangolkote Block under Burdwan Division, P.H.E. DTE. (Pt.-B) , SM/08707 Retrofitting Balance works for different type of works in connection with Jaggeswardihi PWSS, Deulia PWSS, Kunda PWSS and Gohagram PWSS Under Mongalkote Block within Katwa Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer JUNIOR ENGINEER KATWA SUB-DIVISION PHE DTE ORD/001186/2024-2025 593/BWD 07/02/2025 120 MD HASIN 203.38 0.00 0 20
927 PURBA BARDHAMAN Burdwan Division Providing Functional House hold Tap Connection (FHTC) by retrofitting at Kaichar, Sitalgram, Haripur and Mathrun mouzas within the command area of Jageswardihi piped Water Supply Scheme at Mangolkote Block under Burdwan Division, P.H.E. DTE. (Pt.-B) , SM/08707 Retrofitting Providing FHTC (151 Nos.) of the left out house hold at Ichak habitation including Laying of pipe line from the existing Distribution System within the command area of JAGGESWARDIHI Piped Water Supply Scheme at Mangalkote Block under Katwa Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer ORD/001121/2024-2025 495/BWD 28/01/2025 30 ABDUL HAI 8.30 0.00 0 0
928 PURBA BARDHAMAN Burdwan Division PROVIDING FUNCTIONAL HOUSEHOLD TAP CONNECTION (FHTC) PHASE-II BY AREA OF KASIARA PIPED WATER SUPPLY SCHEME AT MONGALKOTE BLOCK UNDER BURDWAN DIVISION PHE DTE. , SM/12080 Retrofitting Connection of CGWB Tube well Raising Main Line of Head Work Site of Kashiyara Piped Water Supply Scheme within Katwa Sub-Division under Burdwan Division, P.H.E. Dte. (Sl No-1) Assistant Engineer ORD/000162/2021-2022 635/KTS 20/09/2021 15 ASMA ENTERPRISE 0.92 0.94 102.17 1
929 PURBA BARDHAMAN Burdwan Division PROVIDING FUNCTIONAL HOUSEHOLD TAP CONNECTION (FHTC) PHASE-II BY AREA OF KASIARA PIPED WATER SUPPLY SCHEME AT MONGALKOTE BLOCK UNDER BURDWAN DIVISION PHE DTE. , SM/12080 Retrofitting Extention of pipe line for providing FHTC from existing Distribuation System within scheme jurisdiction in Kashiara Piped Water Supply Scheme at Gotishta Village within Katwa Sub-Division under Burdwan Division PHE Dte. (Sl -3) Assistant Engineer ORD/000160/2021-2022 663/KTS 28/09/2021 15 MAJUMDER ENTERPRISE 4.84 4.81 99.38 1
930 PURBA BARDHAMAN Burdwan Division PROVIDING FUNCTIONAL HOUSEHOLD TAP CONNECTION (FHTC) PHASE-II BY AREA OF KASIARA PIPED WATER SUPPLY SCHEME AT MONGALKOTE BLOCK UNDER BURDWAN DIVISION PHE DTE. , SM/12080 Retrofitting Extension of pipe line from the existing Distribution System within scheme jurisdiction at Gopalbera village under KASIYARA PWSS under Katwa Sub-Division under Burdwan Division PHE Dte. [Sl - 1] Assistant Engineer ORD/000158/2021-2022 661/KTS 28/09/2021 15 MAJUMDER ENTERPRISE 1.26 1.23 97.62 1
931 PURBA BARDHAMAN Burdwan Division PROVIDING FUNCTIONAL HOUSEHOLD TAP CONNECTION (FHTC) PHASE-II BY AREA OF KASIARA PIPED WATER SUPPLY SCHEME AT MONGALKOTE BLOCK UNDER BURDWAN DIVISION PHE DTE. , SM/12080 Retrofitting Extension of pipe line from the existing Distribution System within scheme jurisdiction at Kasiyara and Dirghyasoya village under KASIYARA PWSS under Katwa Sub-Division under Burdwan Division PHE Dte. [Sl - 2] Assistant Engineer ORD/000159/2021-2022 662/KTS 28/09/2021 15 MAJUMDER ENTERPRISE 4.56 4.56 100 1
932 PURBA BARDHAMAN Burdwan Division PROVIDING FUNCTIONAL HOUSEHOLD TAP CONNECTION (FHTC) PHASE-II BY AREA OF KASIARA PIPED WATER SUPPLY SCHEME AT MONGALKOTE BLOCK UNDER BURDWAN DIVISION PHE DTE. , SM/12080 Retrofitting Providing Functional Household Tap Connection at Gopalbera , Gotistha, dirghesoa habitation of Gopalbera , Gotistha, Kashiara village of Chanak and Gotistha G.P. from existing distribution system within the command area of Kashiara PWSS under Mongalkote Block under Katwa Sub-Division under Burdwan Division PHE Dte. (Sl No-01) Assistant Engineer ORD/000590/2021-2022 127/KTS 21/02/2022 30 TAPAS KUMAR ROY 4.83 4.73 97.93 1
933 PURBA BARDHAMAN Burdwan Division PROVIDING FUNCTIONAL HOUSEHOLD TAP CONNECTION (FHTC) PHASE-II BY AREA OF KASIARA PIPED WATER SUPPLY SCHEME AT MONGALKOTE BLOCK UNDER BURDWAN DIVISION PHE DTE. , SM/12080 Retrofitting Extension of pipe line from the existing Distribution System within scheme jurisdiction at Chanak village under Kashiara PWSS under Mongalkote Block under Katwa Sub-Division under Burdwan Division PHE Dte. _2nd Call [Sl No-01] Assistant Engineer ORD/000076/2022-2023 319/KTS 25/04/2022 21 ASMA ENTERPRISE 0.95 0.92 96.84 1
934 PURBA BARDHAMAN Burdwan Division Providing Water Supply Arrangement by Sinking of Tube Well at left out Primary Schools(290 nos) for 100% School Coverage in Purba Bardhaman within Kalna Sub Division under Burdwan Division P.H.E. DTE. , SM/11283 School Material Requisition To Resource Division RTOR000049/2022-2023 5398/BWD 12/12/2022 0 Resource Division 85.00 0.00 0 0
935 PURBA BARDHAMAN Burdwan Division Providing Water Supply Arrangement by Sinking of Tube Well at left out Primary Schools(290 nos) for 100% School Coverage in Purba Bardhaman within Kalna Sub Division under Burdwan Division P.H.E. DTE. , SM/11283 School Sinking of 100mtr. deep 100 × 40mm tubewell for providing water supply arrangement in Schools under Purbasthali II Block (16 Nos School) within Purba Bardhaman District under Burdwan Division, PHE Dte. Assistant Engineer ORD/000289/2022-2023 3595/BWD 17/08/2022 30 INVENT ENGINEERS CO. OPERATIVE SOCIETY LTD. 17.90 16.44 91.84 0
936 PURBA BARDHAMAN Burdwan Division Providing Water Supply Arrangement by Sinking of Tube Well at left out Primary Schools(290 nos) for 100% School Coverage in Purba Bardhaman within Kalna Sub Division under Burdwan Division P.H.E. DTE. , SM/11283 School Sinking of 100mtr. deep 100 × 40mm tubewell for providing water supply arrangement in Schools under Monteswar Block (47 Nos School) within Purba Bardhaman District under Burdwan Division, PHE Dte. (Part-C). Assistant Engineer ORD/000324/2022-2023 3661/BWD 29/08/2022 45 MITHU BUILDERS 52.73 45.16 85.64 0
937 PURBA BARDHAMAN Burdwan Division Providing Water Supply Arrangement by Sinking of Tube Well at left out Primary Schools(290 nos) for 100% School Coverage in Purba Bardhaman within Kalna Sub Division under Burdwan Division P.H.E. DTE. , SM/11283 School Sinking of 100mtr. deep 100 × 40mm tubewell for providing water supply arrangement in Schools under Kalna-I Block (43 Nos School) within Purba Bardhaman District under Burdwan Division, PHE Dte._2ND CALL. Assistant Engineer ORD/000363/2022-2023 3806/BWD 02/09/2022 45 INVENT ENGINEERS CO. OPERATIVE SOCIETY LTD. 48.36 42.83 88.56 100
938 PURBA BARDHAMAN Burdwan Division Providing Water Supply Arrangement by Sinking of Tube Well at left out Primary Schools(290 nos) for 100% School Coverage in Purba Bardhaman within Kalna Sub Division under Burdwan Division P.H.E. DTE. , SM/11283 School Sinking of 100mtr. deep 100 × 40mm tubewell for providing water supply arrangement in Schools under Purbasthali ¿ I Block (36 Nos School) within Purba Bardhaman District under Burdwan Division, PHE Dte. Assistant Engineer ORD/000192/2022-2023 3418/BWD 05/08/2022 30 HAMID SK 40.56 36.13 89.08 0
939 PURBA BARDHAMAN Burdwan Division Providing Water Supply Arrangement by Sinking of Tube Well at left out Primary Schools(290 nos) for 100% School Coverage in Purba Bardhaman within Kalna Sub Division under Burdwan Division P.H.E. DTE. , SM/11283 School Material Requisition To Resource Division RTOR000025/2022-2023 3300/BWD 29/07/2022 0 Resource Division 104.70 0.00 0 0
940 PURBA BARDHAMAN Burdwan Division Providing Water Supply Arrangement by Sinking of Tube Well at left out Primary Schools(290 nos) for 100% School Coverage in Purba Bardhaman within Kalna Sub Division under Burdwan Division P.H.E. DTE. , SM/11283 School Sinking of 100mtr. deep 100 × 40mm tubewell for providing water supply arrangement in Schools under Monteswar Block (50 Nos School) within Purba Bardhaman District under Burdwan Division, PHE Dte. (Part-B). Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000306/2022-2023 3665/BWD 29/08/2022 45 SUKALPA NIRMAN 56.36 51.46 91.31 50
941 PURBA BARDHAMAN Burdwan Division Providing Water Supply Arrangement by Sinking of Tube Well at left out Primary Schools(290 nos) for 100% School Coverage in Purba Bardhaman within Kalna Sub Division under Burdwan Division P.H.E. DTE. , SM/11283 School Sinking of 100mtr. deep 100 × 40mm tubewell for providing water supply arrangement in Schools under Monteswar Block (50 Nos School) within Purba Bardhaman District under Burdwan Division, PHE Dte. (Part-A). Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000307/2022-2023 3662/BWD 29/08/2022 45 SUPRIYA RAY 56.36 51.31 91.04 100
942 PURBA BARDHAMAN Khandaghosh Burdwan Division UKHRID PIPED WATER SUPPLY SCHEME , SM/13505 New Material Requisition To Resource Division RTOR000082/2023-2024 1962/BWD 25/04/2023 0 Resource Division 31.25 0.00 0 0
943 PURBA BARDHAMAN Khandaghosh Burdwan Division UKHRID PIPED WATER SUPPLY SCHEME , SM/13505 New Material Requisition To Resource Division RTOR000165/2023-2024 2155/BWD 10/05/2023 0 Resource Division 12.60 0.00 0 0
944 PURBA BARDHAMAN Khandaghosh Burdwan Division UKHRID PIPED WATER SUPPLY SCHEME , SM/13505 New Material Requisition To Resource Division RTOR000736/2023-2024 5234/BWD 30/11/2023 0 Resource Division 21.07 0.00 0 0
945 PURBA BARDHAMAN Khandaghosh Central Mechanical UKHRID PIPED WATER SUPPLY SCHEME , SM/13505 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at BICHKHARA & others water supply scheme under Khandoghosh Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman ASSISTANT ENGINEER Junior Engineer ORD/000064/2024-2025 2390/CMD 02/08/2024 90 MS DAS ELECTRIC CO 46.54 0.00 0 0
946 PURBA BARDHAMAN Khandaghosh Central Mechanical UKHRID PIPED WATER SUPPLY SCHEME , SM/13505 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at Ukhrid Water Supply Scheme [ Block- Khandogosh ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER Junior Engineer ORD/000708/2023-2024 4019/CMD 29/08/2023 30 C.M. ENTERPRISE 28.88 23.89 82.72 100
947 PURBA BARDHAMAN Khandaghosh Central Mechanical UKHRID PIPED WATER SUPPLY SCHEME , SM/13505 New Quotation for new service connection at Ukhrid W/S Scheme PH-II. BILL/01810/2023-2024 BP-2023-24-304 30/12/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 4.29 0.00 0 0
948 PURBA BARDHAMAN Khandaghosh Central Mechanical UKHRID PIPED WATER SUPPLY SCHEME , SM/13505 New Quotation for new service connection at UKHRID W/S Scheme PH-I. BILL/01816/2023-2024 BP-2023-24-303 30/12/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 4.54 0.00 0 0
949 PURBA BARDHAMAN Khandaghosh Burdwan Division UKHRID PIPED WATER SUPPLY SCHEME , SM/13505 New Different works related (sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of different capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site) to AMRA, BALABATI, UKHRID & RUPSA Piped Water Supply Scheme under KHANDAGHOSH Block, District:- Purba Bardhaman [NEW SCHEME] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer1, Durgapur Sub-Division, PHE Dte.,Junior Engineer2, Durgapur Sub-Division, PHE Dte. ORD/000008/2023-2024 1726/BWD 13/04/2023 902 S.P. CONSTRUCTION 1,710.27 276.07 16.14 45
950 PURBA BARDHAMAN Manteswar Burdwan Division GROUND WATER SUPPLY BASED PIPED WATER SUPPLY SCHEME FOR JAMNA PWSS IN MANTESHWAR BLOCK OF PURBA BARDHAMAN UNDER BURDWAN DIVISION PHE DTE , SM/13291 New Material Requisition To Resource Division RTOR000290/2023-2024 2197/BWD 12/05/2023 0 Resource Division 5.72 0.00 0 0
951 PURBA BARDHAMAN Manteswar Burdwan Division GROUND WATER SUPPLY BASED PIPED WATER SUPPLY SCHEME FOR JAMNA PWSS IN MANTESHWAR BLOCK OF PURBA BARDHAMAN UNDER BURDWAN DIVISION PHE DTE , SM/13291 New Material Requisition To Resource Division RTOR000542/2023-2024 4307/BWD 29/09/2023 0 Resource Division 78.80 0.00 0 0
952 PURBA BARDHAMAN Manteswar Burdwan Division GROUND WATER SUPPLY BASED PIPED WATER SUPPLY SCHEME FOR JAMNA PWSS IN MANTESHWAR BLOCK OF PURBA BARDHAMAN UNDER BURDWAN DIVISION PHE DTE , SM/13291 New Continuation work order for supply of 01 (one) No. Diesel driven Motor Cab (Bharat Stage-III) on hire basis for the office of the Assistant Engineer, Durgapur Sub-Divison(Burdwan North), P.H.E. DTE. Govt. of West Bengal (for the period of 01/08/2024 to 30/09/2024) Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer1, Durgapur Sub-Division, PHE Dte. ORD/000552/2024-2025 602/DSD 30/07/2024 61 SUJAUDDIN SEKH 0.80 0.19 23.75 100
953 PURBA BARDHAMAN Manteswar Burdwan Division GROUND WATER SUPPLY BASED PIPED WATER SUPPLY SCHEME FOR JAMNA PWSS IN MANTESHWAR BLOCK OF PURBA BARDHAMAN UNDER BURDWAN DIVISION PHE DTE , SM/13291 New Continuation work order for supply of 01 (one) No. Diesel driven Motor Cab (Bharat Stage-III) on hire basis for the office of the Assistant Engineer, Durgapur Sub-Divison(Burdwan North), P.H.E. DTE. Govt. of West Bengal (for the period of 01/10/2024 to 30/11/2024) Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer1, Durgapur Sub-Division, PHE Dte. ORD/000839/2024-2025 772/DSD 18/09/2024 61 SUJAUDDIN SEKH 0.80 0.26 32.5 0
954 PURBA BARDHAMAN Manteswar Burdwan Division GROUND WATER SUPPLY BASED PIPED WATER SUPPLY SCHEME FOR JAMNA PWSS IN MANTESHWAR BLOCK OF PURBA BARDHAMAN UNDER BURDWAN DIVISION PHE DTE , SM/13291 New Material Requisition To Resource Division RTOR000784/2023-2024 329/BWD 24/01/2024 0 Resource Division 36.64 0.00 0 0
955 PURBA BARDHAMAN Manteswar Central Mechanical GROUND WATER SUPPLY BASED PIPED WATER SUPPLY SCHEME FOR JAMNA PWSS IN MANTESHWAR BLOCK OF PURBA BARDHAMAN UNDER BURDWAN DIVISION PHE DTE , SM/13291 New NEW SERVICE CONNECTION FOR JAMNA PWSS TW -2. BILL/03106/2023-2024 BP-2023-24-646 15/03/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 4.48 0.00 0 0
956 PURBA BARDHAMAN Manteswar Burdwan Division GROUND WATER SUPPLY BASED PIPED WATER SUPPLY SCHEME FOR JAMNA PWSS IN MANTESHWAR BLOCK OF PURBA BARDHAMAN UNDER BURDWAN DIVISION PHE DTE , SM/13291 New Alt&ment of Fund due to damaged causes by PHED pipe tine work in connection with the work namely Construction of road from Jamna Samabay Samiti on PWD (Roads) to Moynampur more on Memari- Monteswar PWD Road via Dheuchanda, Katsihi Village under Monteswar Block in the District Purba Bardhaman under RIDF-XXVI|I BILL/00950/2024-2025 1051/JJM 05/11/2024 0 EXECUTIVE ENGINEER (WBSRDA) PURBA BARDHAMAN DIVISION 10.97 0.00 0 0
957 PURBA BARDHAMAN Manteswar Central Mechanical GROUND WATER SUPPLY BASED PIPED WATER SUPPLY SCHEME FOR JAMNA PWSS IN MANTESHWAR BLOCK OF PURBA BARDHAMAN UNDER BURDWAN DIVISION PHE DTE , SM/13291 New NEW SERVICE CONNECTION FOR JAMNA PWSS. BILL/02691/2023-2024 BP-2023-24-572 27/02/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.32 0.00 0 0
958 PURBA BARDHAMAN Manteswar Central Mechanical GROUND WATER SUPPLY BASED PIPED WATER SUPPLY SCHEME FOR JAMNA PWSS IN MANTESHWAR BLOCK OF PURBA BARDHAMAN UNDER BURDWAN DIVISION PHE DTE , SM/13291 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at Jamna Water Supply Scheme [ Block- Monteshwar ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000738/2023-2024 4048/CMD 29/08/2023 703 MS DAS ELECTRIC CO 29.95 0.00 0 50
959 PURBA BARDHAMAN Manteswar Burdwan Division GROUND WATER SUPPLY BASED PIPED WATER SUPPLY SCHEME FOR JAMNA PWSS IN MANTESHWAR BLOCK OF PURBA BARDHAMAN UNDER BURDWAN DIVISION PHE DTE , SM/13291 New Different works related (sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of different capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site) to BELENDA, JAMNA, PIPLON & PARGUNA Piped Water Supply Scheme under Manteswar Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer1, Durgapur Sub-Division, PHE Dte. ORD/000689/2023-2024 4388/BWD 05/10/2023 667 AKASH CONSTRUCTION 2,296.40 190.98 8.32 50
960 PURBA BARDHAMAN Manteswar Burdwan Division GROUND WATER SUPPLY BASED PIPED WATER SUPPLY SCHEME FOR JAMNA PWSS IN MANTESHWAR BLOCK OF PURBA BARDHAMAN UNDER BURDWAN DIVISION PHE DTE , SM/13291 New Balance work for laying of pipeline, providing FHTC & other allied works in connection with Augmentation of MONTESWAR PWSS & SUTRA PWSS (SM/13280) under Kalna Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000980/2024-2025 3572/BWD 27/09/2024 181 BAKSHI ENTERPRISE 51.14 0.00 0 30
961 PURBA BARDHAMAN Manteswar Central Mechanical GROUND WATER SUPPLY BASED PIPED WATER SUPPLY SCHEME FOR JAMNA PWSS IN MANTESHWAR BLOCK OF PURBA BARDHAMAN UNDER BURDWAN DIVISION PHE DTE , SM/13291 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Sutra & others water supply scheme under Monteswar Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000068/2024-2025 2396/CMD 02/08/2024 455 SINHA ELECTRICALS 78.06 0.00 0 20
962 PURBA BARDHAMAN Manteswar Burdwan Division GROUND WATER SUPPLY BASED PIPED WATER SUPPLY SCHEME FOR JAMNA PWSS IN MANTESHWAR BLOCK OF PURBA BARDHAMAN UNDER BURDWAN DIVISION PHE DTE , SM/13291 New Continuation work order for supply of 01 (one) No. Diesel driven Motor Cab (Bharat Stage-III) on hire basis for the office of the Assistant Engineer, Durgapur Sub-Divison(Burdwan North), P.H.E. DTE. Govt. of West Bengal (for the period of 01/12/2024 to 31/12/2024) Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer1, Durgapur Sub-Division, PHE Dte. ORD/000994/2024-2025 992/DSD 25/11/2024 61 SUJAUDDIN SEKH 0.40 0.17 42.5 0
963 PURBA BARDHAMAN Manteswar Burdwan Division GROUND WATER SUPPLY BASED PIPED WATER SUPPLY SCHEME FOR JAMNA PWSS IN MANTESHWAR BLOCK OF PURBA BARDHAMAN UNDER BURDWAN DIVISION PHE DTE , SM/13291 New Continuation for Supply of 01 (one) No. Diesel driven Motor Cab (Bharat Stage-III) on hire basis for the office of the Assistant Engineer, Durgapur Sub-Divison(Burdwan North), P.H.E. DTE. Govt. of West Bengal (for the period of 01/06/2025 to 31/07/2025) ORD/000179/2025-2026 808/DSD 29/05/2025 61 SK ALACK JANDER 0.80 0.00 0 0
964 PURBA BARDHAMAN Manteswar Burdwan Division GROUND WATER SUPPLY BASED PIPED WATER SUPPLY SCHEME FOR JAMNA PWSS IN MANTESHWAR BLOCK OF PURBA BARDHAMAN UNDER BURDWAN DIVISION PHE DTE , SM/13291 New Continuation for Supply of 01 (one) No. Diesel driven Motor Cab (Bharat Stage-III) on hire basis for the office of the Assistant Engineer, Durgapur Sub-Division (Burdwan North), P.H.E. DTE. Govt. of West Bengal (for the period of 01/04/2025 to 31/05/2025) ORD/001513/2024-2025 483/DSD 21/03/2025 61 SK ALACK JANDER 0.80 0.25 31.25 0
965 PURBA BARDHAMAN Manteswar Burdwan Division GROUND WATER SUPPLY BASED PIPED WATER SUPPLY SCHEME FOR JAMNA PWSS IN MANTESHWAR BLOCK OF PURBA BARDHAMAN UNDER BURDWAN DIVISION PHE DTE , SM/13291 New Supply of 01 (one) No. Diesel driven Motor Cab (Bharat Stage-III) on hire basis for the office of the Assistant Engineer, Durgapur Sub-Divison(Burdwan North), P.H.E. DTE. Govt. of West Bengal (for the period of 01/02/2025 to 31/03/2025) ORD/001508/2024-2025 142/DSD 24/01/2025 59 SK ALACK JANDER 0.80 0.27 33.75 0
966 PURBA BARDHAMAN Manteswar Burdwan Division GROUND WATER SUPPLY BASED PIPED WATER SUPPLY SCHEME FOR JAMNA PWSS IN MANTESHWAR BLOCK OF PURBA BARDHAMAN UNDER BURDWAN DIVISION PHE DTE , SM/13291 New Continuation for Supply of 01 (one) No. Diesel driven Motor Cab (Bharat Stage-III) on hire basis for the office of the Assistant Engineer, Durgapur Sub-Division(Burdwan North), P.H.E. DTE. Govt. of West Bengal (for the period of 01/10/2025 to 30/11/2025) ORD/000752/2025-2026 1248/DSD 23/09/2025 61 SK ALACK JANDER 0.80 0.00 0 0
967 PURBA BARDHAMAN Manteswar Burdwan Division GROUND WATER SUPPLY BASED PIPED WATER SUPPLY SCHEME FOR JAMNA PWSS IN MANTESHWAR BLOCK OF PURBA BARDHAMAN UNDER BURDWAN DIVISION PHE DTE , SM/13291 New Continuation for Supply of 01 (one) No. Diesel driven Motor Cab (Bharat Stage-III) on hire basis for the office of the Assistant Engineer, Durgapur Sub-Divison(Burdwan North), P.H.E. DTE. Govt. of West Bengal (for the period of 01/08/2025 to 30/09/2025) ORD/000516/2025-2026 1076/DSD 30/07/2025 63 SK ALACK JANDER 0.80 0.00 0 0
968 PURBA BARDHAMAN Memari-I Burdwan Division DEHA PIPED WATER SUPPLY SCHEME , SM/13506 New Material Requisition To Resource Division RTOR000238/2023-2024 2197/BWD 12/05/2023 0 Resource Division 8.90 0.00 0 0
969 PURBA BARDHAMAN Memari-I Burdwan Division DEHA PIPED WATER SUPPLY SCHEME , SM/13506 New Material Requisition To Resource Division RTOR000463/2023-2024 3987/BWD 08/09/2023 0 Resource Division 4.94 0.00 0 0
970 PURBA BARDHAMAN Memari-I Burdwan Division DEHA PIPED WATER SUPPLY SCHEME , SM/13506 New Material Requisition To Resource Division RTOR000664/2023-2024 5103/BWD 23/11/2023 0 Resource Division 20.46 0.00 0 0
971 PURBA BARDHAMAN Memari-I Burdwan Division DEHA PIPED WATER SUPPLY SCHEME , SM/13506 New Continuation order for "Supply of one No. Diesel Driven Ambassador Car on hire basis for the office of the Assistant Engineer, Burdwan Sub-Division, PHE Dte for the period of 01.12.2023 to 31.05.2024 Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/001007/2023-2024 2751/BSD 28/11/2023 183 SK.ASFIA 2.40 0.40 16.67 70
972 PURBA BARDHAMAN Memari-I Burdwan Division DEHA PIPED WATER SUPPLY SCHEME , SM/13506 New Continuation work order for "Supply of one No. Diesel Driven Ambassador Car on hire basis for the office of the Assistant Engineer, Burdwan Sub-Division, PHE Dte. (Period from 01-09-2024 to 30-11-2024 Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000682/2024-2025 1957/BSD 30/08/2024 91 SK. ASFIA 1.20 0.40 33.33 60
973 PURBA BARDHAMAN Memari-I Central Mechanical DEHA PIPED WATER SUPPLY SCHEME , SM/13506 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at DEHA Water Supply Scheme [ Block- MEMARI-1 ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER Junior Engineer ORD/000807/2023-2024 4092/CMD 29/08/2023 491 ORIENTAL ENGINEERING CO. 29.39 20.12 68.46 100
974 PURBA BARDHAMAN Memari-I Central Mechanical DEHA PIPED WATER SUPPLY SCHEME , SM/13506 New Quotation for new electric service connection at Deha PH NO.-2 BILL/01737/2023-2024 BP-2023-24-241 07/12/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 1.48 0.00 0 0
975 PURBA BARDHAMAN Memari-I Central Mechanical DEHA PIPED WATER SUPPLY SCHEME , SM/13506 New Quotation for new electric service connection at Deha PH NO.-1 BILL/01738/2023-2024 BP-2023-24-242 07/12/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 5.27 0.00 0 0
976 PURBA BARDHAMAN Memari-I Burdwan Division DEHA PIPED WATER SUPPLY SCHEME , SM/13506 New Different works related (sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of different capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site) to DEHA & BIJRA Piped Water Supply Scheme under Memari I Block, District:- Purba Bardhaman [NEW SCHEME] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000092/2023-2024 2215/BWD 15/05/2023 870 CONCORD ENGINEERING 868.87 208.27 23.97 60
977 PURBA BARDHAMAN Memari-I Burdwan Division DEHA PIPED WATER SUPPLY SCHEME , SM/13506 New Restoration of concrete road by Cement concrete (mix 1:1.5:3),Providing balance FHTC, parallel pipeline, drainage system, boundary wall, Bridge, land development, Sluice valve chamber for smooth water supply of FHTC work for DURGADANGA SVS & DEHA PWSS and its adjoining mouzas within MEMARI-I BLOCK under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/001039/2024-2025 141/BWD 08/01/2025 90 MUKHERJEE ENTERPRISE 64.37 0.00 0 0
978 PURBA BARDHAMAN Memari-I Burdwan Division DEHA PIPED WATER SUPPLY SCHEME , SM/13506 New Continuation Work Order for Supply of one No.Diesel Driven Ambassador Car No. WB:41H-4009 on hire basis for the office of the Assistant Engineer,Burdwan Sub-Division,PHE Dte(Period from 01-03-2025 to 31.05.2025) Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/001407/2024-2025 457/BSD 28/02/2025 90 SK. ASFIA 1.20 0.40 33.33 100
979 PURBA BARDHAMAN Purbasthali-I Central Mechanical HARIPUR PIPED WATER SUPPLY SCHEME , SM/13315 New Supply & Installation of Submersible Pumping Machinery , Voltage Stabilizer, Chlorination System and Internal House wiring for Tube well no.- 1 & 2 at HARIPUR Water Supply Scheme [Block - PURBASTHALI-1] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000164/2023-2024 2931/CMD 12/07/2023 30 ASHIM UDYOG 20.77 9.37 45.11 30
980 PURBA BARDHAMAN Purbasthali-I Burdwan Division HARIPUR PIPED WATER SUPPLY SCHEME , SM/13315 New Material Requisition To Resource Division RTOR000521/2023-2024 4284/BWD 29/09/2023 0 Resource Division 0.55 0.00 0 0
981 PURBA BARDHAMAN Purbasthali-I Burdwan Division HARIPUR PIPED WATER SUPPLY SCHEME , SM/13315 New Material Requisition To Resource Division RTOR000152/2023-2024 2155/BWD 10/05/2023 0 Resource Division 10.75 0.00 0 0
982 PURBA BARDHAMAN Purbasthali-I Burdwan Division HARIPUR PIPED WATER SUPPLY SCHEME , SM/13315 New Material Requisition To Resource Division RTOR000599/2023-2024 4905/BWD 10/11/2023 0 Resource Division 4.86 0.00 0 0
983 PURBA BARDHAMAN Purbasthali-I Central Mechanical HARIPUR PIPED WATER SUPPLY SCHEME , SM/13315 New New service connection charges for Haripur PWSS TW-1 BILL/00820/2023-2024 BP-2023-24-97 02/08/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.02 0.00 0 0
984 PURBA BARDHAMAN Purbasthali-I Central Mechanical HARIPUR PIPED WATER SUPPLY SCHEME , SM/13315 New Withdrawing of pump motor set due to low discharge and installation of new pump motor set at Haripur PH 1 (Purbasthali-1 Block) water supply scheme under CMD P.H.E. Dte. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/001893/2023-2024 364/CMSD 28/02/2024 15 ASHIM UDYOG 0.67 0.00 0 0
985 PURBA BARDHAMAN Purbasthali-I Central Mechanical HARIPUR PIPED WATER SUPPLY SCHEME , SM/13315 New Supply and Delivery of standby pump motor set for Sipta, Uchitpur, Haripur & others Water Supply Scheme under CMD, PHE Dte. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000142/2024-2025 2596/CMD 27/08/2024 30 JOYGURU ENTERPRISE 4.72 1.65 34.96 100
986 PURBA BARDHAMAN Purbasthali-I Central Mechanical HARIPUR PIPED WATER SUPPLY SCHEME , SM/13315 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Haripur & others water supply scheme under purbasthali 1 Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000072/2024-2025 2397/CMD 02/08/2024 90 CHATTERJEE ENTERPRISE 48.60 0.00 0 30
987 PURBA BARDHAMAN Purbasthali-I Burdwan Division HARIPUR PIPED WATER SUPPLY SCHEME , SM/13315 New HARIPUR Piped Water Supply Scheme with sinking of Tube-well, LDS, Rising Main, FHTC & construction of switch rooms & boundary walls with gates and land development, drain and internal pathway at different TW site under Purbasthali I Block, District:- Purba-Bardhaman [NEW SCHEME]. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000774/2022-2023 1340/BWD 22/03/2023 373 INVENT ENGINEERS CO. OPERATIVE SOCIETY LTD. 94.46 67.41 71.36 100
988 PURBA BARDHAMAN Kalna-I Burdwan Division NIRALGACHHI PIPED WATER SUPPLY SCHEME , SM/14436 New Material Requisition To Resource Division RTOR000042/2023-2024 1962/BWD 25/04/2023 0 Resource Division 37.35 0.00 0 0
989 PURBA BARDHAMAN Kalna-I Burdwan Division NIRALGACHHI PIPED WATER SUPPLY SCHEME , SM/14436 New Material Requisition To Resource Division RTOR000178/2023-2024 2155/BWD 10/05/2023 0 Resource Division 20.14 0.00 0 0
990 PURBA BARDHAMAN Kalna-I Central Mechanical NIRALGACHHI PIPED WATER SUPPLY SCHEME , SM/14436 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Joykrishnapur & others water supply scheme under Purbasthali-2,jamalpur,kalna 1 Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000101/2024-2025 2398/CMD 02/08/2024 90 MS S G ENTERPRISE 53.43 0.00 0 0
991 PURBA BARDHAMAN Kalna-I Central Mechanical NIRALGACHHI PIPED WATER SUPPLY SCHEME , SM/14436 New NEW SERVICE CONNECTION FOR NIRALGACHI PWSS TW-I BILL/00106/2024-2025 BP-2024-25-42 26/04/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 9.14 0.00 0 0
992 PURBA BARDHAMAN Kalna-I Central Mechanical NIRALGACHHI PIPED WATER SUPPLY SCHEME , SM/14436 New Quotation for new service connection at Niralgachi PWSS TW-2. BILL/00663/2024-2025 BP-2024-25-265 20/08/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 8.28 0.00 0 0
993 PURBA BARDHAMAN Kalna-I Burdwan Division NIRALGACHHI PIPED WATER SUPPLY SCHEME , SM/14436 New Different works related (sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of different capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site) to TAIPARA & NIRALGACHHI Piped Water Supply Scheme under Manteswar Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer Junior Engineer, R.W.S. Burdwan Sub Division, P.H.E. Dt ORD/000048/2023-2024 1825/BWD 19/04/2023 865 S. GHOSH & ASSOCIATES PVT LTD. 1,064.74 66.37 6.23 85
994 PURBA BARDHAMAN Manteswar Burdwan Division SHUSHNA PIPED WATER SUPPLY SCHEME , SM/14438 New Material Requisition To Resource Division RTOR000319/2023-2024 2197/BWD 12/05/2023 0 Resource Division 12.94 0.00 0 0
995 PURBA BARDHAMAN Manteswar Burdwan Division SHUSHNA PIPED WATER SUPPLY SCHEME , SM/14438 New Material Requisition To Resource Division RTOR000455/2023-2024 3979/BWD 08/09/2023 0 Resource Division 32.04 0.00 0 0
996 PURBA BARDHAMAN Manteswar Burdwan Division SHUSHNA PIPED WATER SUPPLY SCHEME , SM/14438 New Providing FHTC with laying of 90 mm dia HDPE Pipe of Susunia PWSS of Kuli village under Manteswar Block under Durgapur Sub Division of Burdwan Division ,P.H.E.Dte ORD/001163/2023-2024 269/DSD 15/03/2024 30 SOUMYAVASH DAS 0.94 0.00 0 0
997 PURBA BARDHAMAN Manteswar Burdwan Division SHUSHNA PIPED WATER SUPPLY SCHEME , SM/14438 New Construction of valve chamber HD works site and installation of sluice valve at Budpur village of Susunia PWSS under Manteswar Block under Durgapur Sub Division of Burdwan Division ,P.H.E.Dte ORD/001164/2023-2024 268./DSD 15/03/2024 30 PRONAB KUMAR DEY 0.94 0.00 0 0
998 PURBA BARDHAMAN Manteswar Burdwan Division SHUSHNA PIPED WATER SUPPLY SCHEME , SM/14438 New Providing FHTC with laying of 90 mm dia HDPE Pipe of Susunia PWSS under Manteswar Block under Durgapur Sub Division of Burdwan Division ,P.H.E.Dte ORD/001161/2023-2024 266/DSD 15/03/2024 30 PRONAB KUMAR DEY 0.95 0.00 0 0
999 PURBA BARDHAMAN Manteswar Central Mechanical SHUSHNA PIPED WATER SUPPLY SCHEME , SM/14438 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at Shushna Water Supply Scheme [ Block- MONTESWAR ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000761/2023-2024 4062/CMD 29/08/2023 30 ORIENTAL ENGINEERING CO. 28.97 23.46 80.98 80
1000 PURBA BARDHAMAN Manteswar Central Mechanical SHUSHNA PIPED WATER SUPPLY SCHEME , SM/14438 New New service at Shushna PWSS TW-2. BILL/02291/2023-2024 BP-2023-24-440 29/01/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 5.03 0.00 0 0
1001 PURBA BARDHAMAN Manteswar Central Mechanical SHUSHNA PIPED WATER SUPPLY SCHEME , SM/14438 New New Service connection at SHUSHNA PWSS TW-1. BILL/02359/2023-2024 BP-2023-24-481 31/01/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 5.48 0.00 0 0
1002 PURBA BARDHAMAN Manteswar Burdwan Division SHUSHNA PIPED WATER SUPPLY SCHEME , SM/14438 New Different works related (sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of different capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site) to PASCHIM KHARAMPUR, SHUSHNA & SIGHNALI Piped Water Supply Scheme under Manteswar Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer1, Durgapur Sub-Division, PHE Dte. ORD/000482/2023-2024 3494/BWD 09/08/2023 783 S.P. CONSTRUCTION 1,925.07 305.44 15.87 80
1003 PURBA BARDHAMAN Manteswar Burdwan Division SHUSHNA PIPED WATER SUPPLY SCHEME , SM/14438 New Providing FHTC with laying of 90 mm dia HDPE Pipe of Susunia PWSS of kalsar village under Manteswar Block under Durgapur Sub Division of Burdwan Division ,P.H.E.Dte Junior Engineer1, Durgapur Sub-Division, PHE Dte. ORD/001162/2023-2024 267./DSD 15/03/2024 382 PRONAB KUMAR DEY 0.97 0.00 0 100
1004 PURBA BARDHAMAN Manteswar Central Mechanical SHUSHNA PIPED WATER SUPPLY SCHEME , SM/14438 New Supply and installation of Electro-Magnetic flow meter at Bazar Mahammadpur, Dhatrigram, Arjunpukur & others water supply scheme under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000590/2024-2025 3105/CMD 11/12/2024 60 SHREE BISHNU CONSTRUCTION 19.77 0.00 0 0
1005 PURBA BARDHAMAN Manteswar Central Mechanical SHUSHNA PIPED WATER SUPPLY SCHEME , SM/14438 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Sutra & others water supply scheme under Monteswar Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000068/2024-2025 2396/CMD 02/08/2024 455 SINHA ELECTRICALS 78.06 0.00 0 20
1006 PURBA BARDHAMAN Burdwan-I Burdwan Division BAHIR SARBAMANGALA-B PIPED WATER SUPPLY SCHEME , SM/14979 New BAHIRSARBAMANGALA-B Piped Water Supply Scheme with sinking of Tube-well, LDS, Rising Main, FHTC, Construction of 300 cum capacity RCC OHR with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drain and internal pathway at different TW site under Burdwan-I Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000107/2023-2024 2298/BWD 19/05/2023 365 MLG CONSTRUCTION 308.66 0.00 0 0
1007 PURBA BARDHAMAN Burdwan-I Central Mechanical BAHIR SARBAMANGALA-B PIPED WATER SUPPLY SCHEME , SM/14979 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at Bahir Sarbamangala-B Water Supply Scheme [ Block- Burdwan-1 ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER Junior Engineer ORD/001049/2023-2024 4046/CMD 29/08/2023 30 CHOUDHURY ENTERPRISE 29.34 0.00 0 0
1008 PURBA BARDHAMAN Burdwan-I Burdwan Division BAHIR SARBAMANGALA-B PIPED WATER SUPPLY SCHEME , SM/14979 New Material Requisition To Resource Division RTOR000202/2023-2024 2155/BWD 10/05/2023 0 Resource Division 13.95 0.00 0 0
1009 PURBA BARDHAMAN Burdwan-I Burdwan Division BAHIR SARBAMANGALA-B PIPED WATER SUPPLY SCHEME , SM/14979 New Material Requisition To Resource Division RTOR000508/2023-2024 4032/BWD 08/09/2023 0 Resource Division 6.34 0.00 0 0
1010 PURBA BARDHAMAN Burdwan-I Burdwan Division BAHIR SARBAMANGALA-B PIPED WATER SUPPLY SCHEME , SM/14979 New Material Requisition To Resource Division RTOR000646/2023-2024 5095/BWD 23/11/2023 0 Resource Division 20.46 0.00 0 0
1011 PURBA BARDHAMAN Manteswar Burdwan Division IBRAMBAD PIPED WATER SUPPLY SCHEME , SM/14444 New Material Requisition To Resource Division RTOR000278/2023-2024 2197/BWD 12/05/2023 0 Resource Division 3.02 0.00 0 0
1012 PURBA BARDHAMAN Manteswar Burdwan Division IBRAMBAD PIPED WATER SUPPLY SCHEME , SM/14444 New Material Requisition To Resource Division RTOR000520/2023-2024 4052/BWD 11/09/2023 0 Resource Division 3.03 0.00 0 0
1013 PURBA BARDHAMAN Manteswar Burdwan Division IBRAMBAD PIPED WATER SUPPLY SCHEME , SM/14444 New Material Requisition To Resource Division RTOR000454/2023-2024 3978/BWD 08/09/2023 0 Resource Division 32.08 0.00 0 0
1014 PURBA BARDHAMAN Manteswar Burdwan Division IBRAMBAD PIPED WATER SUPPLY SCHEME , SM/14444 New Material Requisition To Resource Division RTOR000780/2023-2024 323/BWD 24/01/2024 0 Resource Division 34.15 0.00 0 0
1015 PURBA BARDHAMAN Manteswar Central Mechanical IBRAMBAD PIPED WATER SUPPLY SCHEME , SM/14444 New Quotation for new electric service connection at Ibrambad PH NO.-2 BILL/01749/2023-2024 BP-2023-24-249 07/12/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 6.13 0.00 0 0
1016 PURBA BARDHAMAN Manteswar Central Mechanical IBRAMBAD PIPED WATER SUPPLY SCHEME , SM/14444 New NEW SERVICE CONNECTION FOR IBRAMBAD PWSS. BILL/02690/2023-2024 BP-2023-24-573 27/02/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 4.51 0.00 0 0
1017 PURBA BARDHAMAN Manteswar Burdwan Division IBRAMBAD PIPED WATER SUPPLY SCHEME , SM/14444 New Different works related (sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of different capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site) to DHENUA, IBRAMBAD & UJNA Piped Water Supply Scheme under Manteswar Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer ,JUNIOR ENGINEER DURGAPUR SUB-DIVISION PHE DTE ORD/000462/2023-2024 3456/BWD 08/08/2023 855 M/S S. CHOUDHURY 2,123.70 286.05 13.47 20
1018 PURBA BARDHAMAN Manteswar Central Mechanical IBRAMBAD PIPED WATER SUPPLY SCHEME , SM/14444 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at Ibrambad Water Supply Scheme [ Block- Monteswar ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000765/2023-2024 4064/CMD 29/08/2023 30 M/S. S.R. ENTERPRISE 28.96 22.76 78.59 90
1019 PURBA BARDHAMAN Manteswar Central Mechanical IBRAMBAD PIPED WATER SUPPLY SCHEME , SM/14444 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Sutra & others water supply scheme under Monteswar Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000068/2024-2025 2396/CMD 02/08/2024 455 SINHA ELECTRICALS 78.06 0.00 0 20
1020 PURBA BARDHAMAN Raina-II Burdwan Division Serpur Piped Water Supply Scheme , SM/13384 New Material Requisition To Resource Division RTOR000301/2023-2024 2197/BWD 12/05/2023 0 Resource Division 7.90 0.00 0 0
1021 PURBA BARDHAMAN Raina-II Burdwan Division Serpur Piped Water Supply Scheme , SM/13384 New Material Requisition To Resource Division RTOR000483/2023-2024 4007/BWD 08/09/2023 0 Resource Division 2.05 0.00 0 0
1022 PURBA BARDHAMAN Raina-II Burdwan Division Serpur Piped Water Supply Scheme , SM/13384 New Material Requisition To Resource Division RTOR000692/2023-2024 5073/BWD 23/11/2023 0 Resource Division 20.46 0.00 0 0
1023 PURBA BARDHAMAN Raina-II Central Mechanical Serpur Piped Water Supply Scheme , SM/13384 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Satinandi,Sanko & others water supply scheme under Galsi-1 Block ; Serpur, Uchalan & others water supply scheme under Raina-2 Block and maro, loapur & others water supply scheme under Galsi-2 block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000397/2024-2025 2751/CMD 24/09/2024 90 ORIENTAL ENGINEERING CO. 88.42 0.00 0 0
1024 PURBA BARDHAMAN Raina-II Central Mechanical Serpur Piped Water Supply Scheme , SM/13384 New NEW SERVICE CONNECTION FOR SERPUR PWSS PH-2 BILL/00107/2024-2025 BP-2024-25-43 26/04/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 4.23 0.00 0 0
1025 PURBA BARDHAMAN Raina-II Central Mechanical Serpur Piped Water Supply Scheme , SM/13384 New New Service connection for Serpur W/S Scheme PH No.-I BILL/01797/2023-2024 BP-2023-24-301 30/12/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.35 0.00 0 0
1026 PURBA BARDHAMAN Raina-II Burdwan Division Serpur Piped Water Supply Scheme , SM/13384 New Different works related (sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of different capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site) to UCHALAN, CHAK CHANDAN, SERPUR & KATNABIL Piped Water Supply Scheme under Raina II Block, District:- Purba Bardhaman [NEW SCHEME] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000367/2023-2024 3076/BWD 18/07/2023 806 SK ALIM 1,307.56 147.46 11.28 75
1027 PURBA BARDHAMAN Raina-II Burdwan Division Serpur Piped Water Supply Scheme , SM/13384 New Continuation Work Order for supply of inspection Vehicle No. WB42Y- 7403 for inspection of different JJM related(schemes) works as and when required including supply of driver & fuel(minimum 8 hours duty per day) and all taxes etc. for Burdwan Sub Division under Burdwan Division, PHE Dte consider 96.00 Km. run per day (Period from 01-02-2025 to 30-04-2025) JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/001402/2024-2025 240/BSD 31/01/2025 66 PARVIN BEGAM 0.85 0.00 0 100
1028 PURBA BARDHAMAN Raina-II Burdwan Division Serpur Piped Water Supply Scheme , SM/13384 New Continuation Work Order for Supply of one No.Diesel Driven Ambassador Car on hire basis for the office of the Assistant Engineer, Burdwan Sub-Division,PHE Dte(Period from 01-09-2025 to 30.11.2025) JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000693/2025-2026 2473/BSD 29/08/2025 91 SK. ASFIA 1.20 0.00 0 0
1029 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Orgram Piped Water Supply Scheme at Bhatar Block , SM/07814 Retrofitting Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of ORGRAM Piped Water Supply Scheme & Sibda Colony habitation, Bhatar Block under Burdwan Division, PHE Dte.(Agreement No. 59/2020-2021 OF SE/CC/PHE. DTE.) Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000123/2020-2021 4886/BWD 07/12/2020 90 NANGTASWAR CO. OP. LABOUR CONT. AND CONSTRUCTION SOCIETY LTD. 97.01 28.41 29.29 1
1030 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Orgram Piped Water Supply Scheme at Bhatar Block , SM/07814 Retrofitting Construction of 300 cum capacity 20 Mtr. staging height RCC Over Head Reservoir including pipe connection and cost of pipes, specials for Orgram (Zone-I) & it's adjoining mouzas W/S. scheme under Burdwan Division, P.H.E. Dte.Ref. Drawing No.PC-I/OHR/7/2012 Dated 07.06.2012. Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000448/2021-2022 764/BWD 07/02/2022 180 S.N. ENTERPRISE 67.98 0.00 0 0
1031 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Orgram Piped Water Supply Scheme at Bhatar Block , SM/07814 Retrofitting Shifting and relaying of Distribution system and Rising main at OHR site of Orgram Piped W/S Scheme (Zone-II) at Bhatar Block under Durgapur Sub-Division, Burdwan Division, P.H.E. Dte. Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer2, Durgapur Sub-Division, PHE Dte. ORD/000566/2023-2024 655/DSD 24/08/2023 30 INDIAN ENGINEERS CO.-OPERATIVE SOCIETY LTD. 0.75 0.00 0 0
1032 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Orgram Piped Water Supply Scheme at Bhatar Block , SM/07814 Retrofitting Formal Work Order for Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of ORGRAM Piped Water Supply Scheme at Salkuni, Orgram (10 Nos Habitation), & Silakote Village (Mouza), Bhatar Block under Burdwan Division, PHE Dte._2ND CALL.(Agreement no. 102/SE/CC/PHE/Dte of 2020-2021) Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000424/2020-2021 1086/BWD 08/02/2021 90 SUPER CO. OPERATIVE LABOUR CONTRACT AND CONSTRUCTION SOCIETY LTD. 81.92 44.04 53.76 1
1033 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Orgram Piped Water Supply Scheme at Bhatar Block , SM/07814 Retrofitting Extension of distribution main for providing FHTC at Shikarpur village within Orgram W/S Scheme (Zone-II) in Bhatar Block under Burdwan Division, P.H.E. Dte. [Gr.-E] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000290/2021-2022 719/DSD 17/12/2021 30 DHIRENDRANATH SOM 3.28 3.28 100 1
1034 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Orgram Piped Water Supply Scheme at Bhatar Block , SM/07814 Retrofitting Extension of distribution main for providing FHTC at Shilakot village within Orgram W/S Scheme (Zone-II) in Bhatar Block under Burdwan Division, P.H.E. Dte.[Gr.-D] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000289/2021-2022 718/DSD 17/12/2021 30 DHIRENDRANATH SOM 3.15 3.10 98.41 1
1035 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Orgram Piped Water Supply Scheme at Bhatar Block , SM/07814 Retrofitting Extension of distribution main for providing FHTC at Shalkuni village within Orgram W/S Scheme (Zone-II) in Bhatar Block under Burdwan Division, P.H.E. Dte. [Gr.-C] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000288/2021-2022 717/DSD 17/12/2021 30 DHIRENDRANATH SOM 3.62 3.62 100 1
1036 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Orgram Piped Water Supply Scheme at Bhatar Block , SM/07814 Retrofitting Extension of pipeline at Bagmara village of Orgram (Z-II) and its adjoining mouzas piped water supply scheme at Bhatar Block within Burdwan Sadar Sub-Division, under Burdwan Division, PHE Dte.[Gr.-G] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000781/2021-2022 952/BSD 23/07/2021 30 M/S S. CHOUDHURY 2.01 0.00 0 1
1037 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Orgram Piped Water Supply Scheme at Bhatar Block , SM/07814 Retrofitting Vehicle bill (Car No.-WB-41H-3668) for the month of July to September'2023. BILL/01679/2023-2024 1142/JJM 29/12/2023 0 MD HASIN 0.86 0.00 0 0
1038 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Orgram Piped Water Supply Scheme at Bhatar Block , SM/07814 Retrofitting Restoration of damaged flanks due to laying of HDPE pipe line along the flank of Burdwan Katwa Road from 14.70 kmp to 16.20 kmp in the district of Purba Bardhaman under Bardhaman Division,P.W.D. BILL/00711/2024-2025 867/JJM 23/09/2024 0 EXECUTIVE ENGINEER PWD BURDWAN DIVISION 7.90 0.00 0 0
1039 PURBA BARDHAMAN Manteswar Burdwan Division Detailed Project Report of Ground Water Supply Based Piped Water Supply Scheme For Paschim Kharampur PWSS in Manteshwar Block of Burdwan District under Burdwan Division, PHE Dte. , SM/13332 New Material Requisition To Resource Division RTOR000365/2023-2024 2197/BWD 12/05/2023 0 Resource Division 14.14 0.00 0 0
1040 PURBA BARDHAMAN Manteswar Burdwan Division Detailed Project Report of Ground Water Supply Based Piped Water Supply Scheme For Paschim Kharampur PWSS in Manteshwar Block of Burdwan District under Burdwan Division, PHE Dte. , SM/13332 New Material Requisition To Resource Division RTOR000452/2023-2024 3976/BWD 08/09/2023 0 Resource Division 103.50 0.00 0 0
1041 PURBA BARDHAMAN Manteswar Burdwan Division Detailed Project Report of Ground Water Supply Based Piped Water Supply Scheme For Paschim Kharampur PWSS in Manteshwar Block of Burdwan District under Burdwan Division, PHE Dte. , SM/13332 New Material Requisition To Resource Division RTOR000781/2023-2024 324/BWD 24/01/2024 0 Resource Division 92.56 0.00 0 0
1042 PURBA BARDHAMAN Manteswar Central Mechanical Detailed Project Report of Ground Water Supply Based Piped Water Supply Scheme For Paschim Kharampur PWSS in Manteshwar Block of Burdwan District under Burdwan Division, PHE Dte. , SM/13332 New New Service connection at PASCHIM KHARAMPUR PWSS TW-1. BILL/02360/2023-2024 BP-2023-24-479 31/01/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 7.89 0.00 0 0
1043 PURBA BARDHAMAN Manteswar Central Mechanical Detailed Project Report of Ground Water Supply Based Piped Water Supply Scheme For Paschim Kharampur PWSS in Manteshwar Block of Burdwan District under Burdwan Division, PHE Dte. , SM/13332 New New service Paschim Kharapur PWSS TW-2. BILL/02290/2023-2024 BP-2023-24-441 29/01/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.93 0.00 0 0
1044 PURBA BARDHAMAN Manteswar Burdwan Division Detailed Project Report of Ground Water Supply Based Piped Water Supply Scheme For Paschim Kharampur PWSS in Manteshwar Block of Burdwan District under Burdwan Division, PHE Dte. , SM/13332 New Different works related (sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of different capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site) to PASCHIM KHARAMPUR, SHUSHNA & SIGHNALI Piped Water Supply Scheme under Manteswar Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer1, Durgapur Sub-Division, PHE Dte. ORD/000482/2023-2024 3494/BWD 09/08/2023 783 S.P. CONSTRUCTION 1,925.07 590.23 30.66 80
1045 PURBA BARDHAMAN Manteswar Central Mechanical Detailed Project Report of Ground Water Supply Based Piped Water Supply Scheme For Paschim Kharampur PWSS in Manteshwar Block of Burdwan District under Burdwan Division, PHE Dte. , SM/13332 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Sutra & others water supply scheme under Monteswar Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000068/2024-2025 2396/CMD 02/08/2024 455 SINHA ELECTRICALS 78.06 0.00 0 20
1046 PURBA BARDHAMAN Purbasthali-I Burdwan Division MOUDANGA PIPED WATER SUPPLY SCHEME , SM/14020 New Material Requisition To Resource Division RTOR000346/2023-2024 2197/BWD 12/05/2023 0 Resource Division 14.15 0.00 0 0
1047 PURBA BARDHAMAN Purbasthali-I Burdwan Division MOUDANGA PIPED WATER SUPPLY SCHEME , SM/14020 New Material Requisition To Resource Division RTOR000511/2023-2024 4035/BWD 08/09/2023 0 Resource Division 1.38 0.00 0 0
1048 PURBA BARDHAMAN Purbasthali-I Burdwan Division MOUDANGA PIPED WATER SUPPLY SCHEME , SM/14020 New Material Requisition To Resource Division RTOR000804/2023-2024 305/BWD 24/01/2024 0 Resource Division 17.52 0.00 0 0
1049 PURBA BARDHAMAN Purbasthali-I Central Mechanical MOUDANGA PIPED WATER SUPPLY SCHEME , SM/14020 New New service connection for MOUDANGA PWSS BILL/02562/2023-2024 BP-2023-24-546 19/02/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 8.78 0.00 0 0
1050 PURBA BARDHAMAN Purbasthali-I Central Mechanical MOUDANGA PIPED WATER SUPPLY SCHEME , SM/14020 New New service connection for Moudanga PH-1 PWSS. BILL/00089/2024-2025 BP-2024-25-28 19/04/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 7.45 0.00 0 0
1051 PURBA BARDHAMAN Purbasthali-I Burdwan Division MOUDANGA PIPED WATER SUPPLY SCHEME , SM/14020 New Different works related (sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of different capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site) to NAMA BHANDARITURI, SAHAPUR & MOUDANGA Piped Water Supply Scheme under PURBASTHALI-I Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000511/2023-2024 3689/BWD 23/08/2023 770 THE MAHADEV CONSTRUCTION 734.18 85.26 11.61 50
1052 PURBA BARDHAMAN Purbasthali-I Central Mechanical MOUDANGA PIPED WATER SUPPLY SCHEME , SM/14020 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at MOUDANGA Water Supply Scheme [ Block- PURBASTHALI-1] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000829/2023-2024 4106/CMD 29/08/2023 581 WEST BENGAL ENGINEERING CO. 26.95 0.00 0 50
1053 PURBA BARDHAMAN Purbasthali-I Burdwan Division MOUDANGA PIPED WATER SUPPLY SCHEME , SM/14020 New Different types of works involve in connection with Augmentation of DIRGHAPARA (SM/07804) Water Supply Scheme, MOUDANGA (SM/ 14020) Water supply Scheme & BHANDARTIKURI (SM/14925) Water Supply Scheme under Burdwan Division, PHE Dte. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000357/2024-2025 2912/BWD 25/07/2024 431 BANSBERIA CONSTRUCTION CO. 293.38 0.00 0 22
1054 PURBA BARDHAMAN Purbasthali-I Burdwan Division MOUDANGA PIPED WATER SUPPLY SCHEME , SM/14020 New Construction of 350cum OHR & Other Allied Works in connection with Augmentation of (SM/07803), (SM/09410), (SM/16304), (SM/15172) & (SM/14020) Piped Water Supply Scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/001048/2024-2025 220/BWD 10/01/2025 270 R.K. MANDAL& CO. 491.79 0.00 0 1
1055 PURBA BARDHAMAN Purbasthali-I Central Mechanical MOUDANGA PIPED WATER SUPPLY SCHEME , SM/14020 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Haripur & others water supply scheme under purbasthali 1 Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000072/2024-2025 2397/CMD 02/08/2024 90 CHATTERJEE ENTERPRISE 48.60 0.00 0 30
1056 PURBA BARDHAMAN Memari-I Burdwan Division DURGADANGA PIPED WATER SUPPLY SINGLE VILLAGE SCHEME , SM/13417 New Material Requisition To Resource Division RTOR000186/2023-2024 2155/BWD 10/05/2023 0 Resource Division 10.35 0.00 0 0
1057 PURBA BARDHAMAN Memari-I Burdwan Division DURGADANGA PIPED WATER SUPPLY SINGLE VILLAGE SCHEME , SM/13417 New Material Requisition To Resource Division RTOR000411/2023-2024 3869/BWD 01/09/2023 0 Resource Division 8.83 0.00 0 0
1058 PURBA BARDHAMAN Memari-I Burdwan Division DURGADANGA PIPED WATER SUPPLY SINGLE VILLAGE SCHEME , SM/13417 New Material Requisition To Resource Division RTOR000749/2023-2024 5250/BWD 30/11/2023 0 Resource Division 20.21 0.00 0 0
1059 PURBA BARDHAMAN Memari-I Central Mechanical DURGADANGA PIPED WATER SUPPLY SINGLE VILLAGE SCHEME , SM/13417 New New service connection charges for Durgadanga PWSS TW-1 BILL/01262/2023-2024 BP-2023-24-122 17/08/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.07 0.00 0 0
1060 PURBA BARDHAMAN Memari-I Central Mechanical DURGADANGA PIPED WATER SUPPLY SINGLE VILLAGE SCHEME , SM/13417 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at SAHAPUR & others water supply scheme under Memari-I Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. ASSISTANT ENGINEER Junior Engineer ORD/000100/2024-2025 2392/CMD 02/08/2024 90 MITRA ENTERPRISE 47.62 0.00 0 0
1061 PURBA BARDHAMAN Memari-I Burdwan Division DURGADANGA PIPED WATER SUPPLY SINGLE VILLAGE SCHEME , SM/13417 New DURGADANGA Single Village Scheme with sinking of Tube-well, LDS, Rising Main, FHTC & construction of switch rooms & boundary walls with gates and land development, drain and internal pathway at different TW site under Memari-I Block, District:- Purba-Bardhaman [NEW SCHEME]. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000010/2023-2024 1714/BWD 12/04/2023 90 A R TRADERS 57.63 57.42 99.64 100
1062 PURBA BARDHAMAN Memari-I Burdwan Division DURGADANGA PIPED WATER SUPPLY SINGLE VILLAGE SCHEME , SM/13417 New Sinking of Tube-well, construction of switch rooms & Rising main at 2ND TW site for DURGADANGA Piped Water Supply Scheme under MEMARI-I Block, District:- Purba-Bardhaman. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000868/2023-2024 5307/BWD 01/12/2023 60 A R TRADERS 21.69 20.71 95.48 100
1063 PURBA BARDHAMAN Memari-I Burdwan Division DURGADANGA PIPED WATER SUPPLY SINGLE VILLAGE SCHEME , SM/13417 New Allied work of Laying distribution system for FHTC work for DURGADANGA Piped Water Supply Scheme at Durgadanga mouza within MEMARI - I Block under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/001017/2023-2024 521/BWD 06/02/2024 30 A R TRADERS 13.36 13.34 99.85 100
1064 PURBA BARDHAMAN Memari-I Central Mechanical DURGADANGA PIPED WATER SUPPLY SINGLE VILLAGE SCHEME , SM/13417 New NEW SERVICE CONNECTION FOR DURGADANGA PWSS BILL/02838/2023-2024 BP-2023-24-587 04/03/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 4.12 0.00 0 0
1065 PURBA BARDHAMAN Memari-I Burdwan Division DURGADANGA PIPED WATER SUPPLY SINGLE VILLAGE SCHEME , SM/13417 New Restoration of concrete road by Cement concrete (mix 1:1.5:3),Providing balance FHTC, parallel pipeline, drainage system, boundary wall, Bridge, land development, Sluice valve chamber for smooth water supply of FHTC work for DURGADANGA SVS & DEHA PWSS and its adjoining mouzas within MEMARI-I BLOCK under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/001039/2024-2025 141/BWD 08/01/2025 90 MUKHERJEE ENTERPRISE 64.37 0.00 0 0
1066 PURBA BARDHAMAN Memari-I Burdwan Division DURGADANGA PIPED WATER SUPPLY SINGLE VILLAGE SCHEME , SM/13417 New Construction of Boundary wall at HEAD WORK Site & 2nd TW site & Culvert at Head work site & Interconnection between Head work site distribution line 2nd Tw site of DURGADANGA Piped Water Supply Scheme under MEMARI-I Block of Burdwan Division, PHE Dte. (Length -164.00 Mtr, Col-66 Nos). Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000321/2024-2025 2857/BWD 22/07/2024 468 SUSUNIA GP CO. OPERATIVE LABOUR CONTRACT AND CONSTRUCTION SOCIETY LTD. 29.26 0.00 0 50
1067 PURBA BARDHAMAN Ketugram-II Burdwan Division CHARKHI PIPED WATER SUPPLY SCHEME , SM/14966 New Material Requisition To Resource Division RTOR000488/2023-2024 4012/BWD 08/09/2023 0 Resource Division 0.69 0.00 0 0
1068 PURBA BARDHAMAN Ketugram-II Burdwan Division CHARKHI PIPED WATER SUPPLY SCHEME , SM/14966 New Material Requisition To Resource Division RTOR000622/2023-2024 4880/BWD 10/11/2023 0 Resource Division 29.60 0.00 0 0
1069 PURBA BARDHAMAN Ketugram-II Central Mechanical CHARKHI PIPED WATER SUPPLY SCHEME , SM/14966 New New service connection charges for Charkhi PWSS TW-2 BILL/00880/2023-2024 BP-2023-24-110 09/08/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 4.25 0.00 0 0
1070 PURBA BARDHAMAN Ketugram-II Central Mechanical CHARKHI PIPED WATER SUPPLY SCHEME , SM/14966 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Kankurhati & others water supply scheme under Ketugram-2 Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. Driller In-Charge Junior Engineer ORD/000103/2024-2025 2408/CMD 02/08/2024 90 DIPALI CONSTRUCTION 41.95 0.00 0 0
1071 PURBA BARDHAMAN Ketugram-II Burdwan Division CHARKHI PIPED WATER SUPPLY SCHEME , SM/14966 New Material Requisition To Resource Division RTOR000770/2023-2024 194/BWD 10/01/2024 0 Resource Division 9.75 0.00 0 0
1072 PURBA BARDHAMAN Ketugram-II Central Mechanical CHARKHI PIPED WATER SUPPLY SCHEME , SM/14966 New Quotation for new electric service connection at Charki PWSS TW No-1 BILL/01744/2023-2024 BP-2023-24-251 07/12/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 5.27 0.00 0 0
1073 PURBA BARDHAMAN Ketugram-II Burdwan Division CHARKHI PIPED WATER SUPPLY SCHEME , SM/14966 New Different works related (sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of different capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site) to CHARKHI & SHIBNUL Piped Water Supply Scheme under KETUGRAM-II Block, District:- Purba Bardhaman [NEW SCHEME] Assistant Engineer JUNIOR ENGINEER KATWA SUB-DIVISION PHE DTE,JUNIOR ENGINEER R.W.S. BURDWAN SUB-DIVISION PHE DTE ORD/000049/2023-2024 1823/BWD 18/04/2023 928 PASCON 723.75 206.17 28.49 35
1074 PURBA BARDHAMAN Ketugram-II Burdwan Division CHARKHI PIPED WATER SUPPLY SCHEME , SM/14966 New Balance work for OHR, extension of pipeline to provide FHTC with land development, plinth protection for pump house & OHR under Charkhi PWSS, Block-Ketugram-II under Katwa Sub Division within Burdwan Division PHE Dte. Assistant Engineer JUNIOR ENGINEER KATWA SUB-DIVISION PHE DTE ORD/000312/2024-2025 2836/BWD 19/07/2024 470 PASCON 74.08 0.00 0 90
1075 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Jaugram piped Water Supply Scheme at Jamalpur Block under Burdwan Division PHE. DTE. , SM/09104 Retrofitting Continuation work order for Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Jougram village (Jougram habitation) of Jougram Piped Water Supply Scheme within Burdwan Sub-Divn. under Burdwan Division, PHE. Dte. (Part-C) [SL. No. : 11] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000031/2021-2022 3408/BWD 25/06/2021 15 N.S. ENTERPRISE 4.86 0.59 12.14 1
1076 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Jaugram piped Water Supply Scheme at Jamalpur Block under Burdwan Division PHE. DTE. , SM/09104 Retrofitting Extension of pipeline for providing functional house hold tap connection at Jougram village of Jougram piped water supply scheme within Burdwan Sub-Division under Burdwan Division, PHE Dte..Gr.A. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000311/2021-2022 1033/BSD 05/08/2021 30 N.S. ENTERPRISE 0.69 0.67 97.1 1
1077 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Jaugram piped Water Supply Scheme at Jamalpur Block under Burdwan Division PHE. DTE. , SM/09104 Retrofitting Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of Jaugram Piped Water Supply Scheme at Jaugram Village (P) (Mouza), Jamalpur Block under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000278/2021-2022 6952/BWD 14/12/2021 30 SAIKAT RAY 33.69 29.78 88.39 1
1078 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Jaugram piped Water Supply Scheme at Jamalpur Block under Burdwan Division PHE. DTE. , SM/09104 Retrofitting Land Development at Jougram 4th T/W Site at Jamalpur Block under Burdwan Sub Division in Burdwan Division,PHE Dte. Gr.G. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000445/2022-2023 1487/BSD 26/08/2022 30 PANCHANAN CHAKROBORTY 1.17 1.10 94.02 1
1079 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Jaugram piped Water Supply Scheme at Jamalpur Block under Burdwan Division PHE. DTE. , SM/09104 Retrofitting Replace damaged and chokaged various dia. A.C. Pipeline with UPVC pipes, construction of valve chambers and providing FHTC at mouza (Habitation) under JOUGRAM PWSS, Jamalpur Development Block of Burdwan Sub-Division under Burdwan Division, PHE Dte". Gr.B. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000475/2022-2023 1599/BSD 14/09/2022 30 MUKHERJEE ENTERPRISE 3.38 3.19 94.38 1
1080 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Jaugram piped Water Supply Scheme at Jamalpur Block under Burdwan Division PHE. DTE. , SM/09104 Retrofitting Laying of 100 mm dia D.I Pipe for Road widening from 4 lane to 6 lane of NH2 at chainage 599+654 & 599+154 at Jougram Water supply within Jamalpur Block,under Burdwan Division,PHE Dte". Group : B. ORD/000109/2022-2023 981/BSD 16/06/2022 30 PRATIVA CONSTRUCTION 2.97 0.00 0 0
1081 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Jaugram piped Water Supply Scheme at Jamalpur Block under Burdwan Division PHE. DTE. , SM/09104 Retrofitting Concrete road at Head Work site Tubewell site of Jaugram Water Supply Scheme under JAMALPUR Block of Burdwan Division, PHE Dte. Gr.L Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000484/2022-2023 1608/BSD 14/09/2022 15 DUBE ENTERPRISE 1.70 0.00 0 1
1082 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Jaugram piped Water Supply Scheme at Jamalpur Block under Burdwan Division PHE. DTE. , SM/09104 Retrofitting Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Ilsora village and Ilsora habitation of JAUGRAM Piped Water Supply Scheme within Burdwan Sub-Divn. under Burdwan Division, PHE. Dte. [Phase - I] [GROUP : ¿6A¿] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000779/2020-2021 3330/BWD 18/09/2020 30 MUKHERJEE ENTERPRISE 4.86 4.86 100 1
1083 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Jaugram piped Water Supply Scheme at Jamalpur Block under Burdwan Division PHE. DTE. , SM/09104 Retrofitting Replacement of 775 meter AC pipeline by using UPVC pipeline in Jaugram piped water supply scheme at Jamalpur Block under Burdwan Division PHE Dte.Gr.A. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000400/2021-2022 69/BSD 14/01/2022 30 MUKHERJEE ENTERPRISE 4.83 4.71 97.52 1
1084 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Jaugram piped Water Supply Scheme at Jamalpur Block under Burdwan Division PHE. DTE. , SM/09104 Retrofitting Providing leftout water tap connection in different villages for 100% coverage to make it Sajal Gram from existing distribution system within scheme jurisdiction of different Piped Water Supply Schemes within Jamalpur Block (Paratal-II, Berugram, Abujhati & Chakdighi G.P.) under Burdwan Division, PHE. Dte. (Part-B). AE(HQs),Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JE/RWS/JAMALPUR ORD/000345/2021-2022 40/BWD 05/01/2022 30 PREMANANDA ROY BISWAS 22.68 3.33 14.68 1
1085 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Jaugram piped Water Supply Scheme at Jamalpur Block under Burdwan Division PHE. DTE. , SM/09104 Retrofitting Construction of Boundary wall at 4th Tubewell site Of Jaugram Water Supply scheme under JAMALPUR Block of Burdwan Division, PHE Dte. (LENGTH- 71.0M, COL.- 28 NOS )Gr.F. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000650/2021-2022 471/BSD 21/03/2022 45 PANCHANAN CHAKROBORTY 3.77 3.72 98.67 1
1086 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Jaugram piped Water Supply Scheme at Jamalpur Block under Burdwan Division PHE. DTE. , SM/09104 Retrofitting Providing leftout water tap connection in different villages for 100% coverage to make it Sajal Gram from existing distribution system within scheme jurisdiction of different Piped Water Supply Schemes within Jamalpur Block (Jarogram, Ajhapur, Panchra & Jougram G.P.) under Burdwan Division, PHE. Dte. (Part-A)_2ND CALL. AE(HQs),Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JE/RWS/JAMALPUR ORD/000592/2021-2022 1454/BWD 11/03/2022 30 PREMANANDA ROY BISWAS 18.83 0.00 0 1
1087 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Jaugram piped Water Supply Scheme at Jamalpur Block under Burdwan Division PHE. DTE. , SM/09104 Retrofitting Construction of Boundary wall at 3RD Tubewell site Of Jaugram Water Supply scheme under JAMALPUR Block of Burdwan Division, PHE Dte. (LENGTH- 70.0M , COL- 28 NOS ) Gr.E Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000649/2021-2022 470/BSD 21/03/2022 45 MUKHERJEE ENTERPRISE 3.83 3.81 99.48 1
1088 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Jaugram piped Water Supply Scheme at Jamalpur Block under Burdwan Division PHE. DTE. , SM/09104 Retrofitting BALANCE PORTION Boundary wall at 3RD Tubewell site Of Jaugram Water Supply scheme under JAMALPUR Block of Burdwan Division, PHE Dte. (LENGTH- 34.0M , COL- 14 NOS) GROUP : G Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000086/2022-2023 820/BSD 20/05/2022 45 MUKHERJEE ENTERPRISE 3.30 3.29 99.7 1
1089 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Jaugram piped Water Supply Scheme at Jamalpur Block under Burdwan Division PHE. DTE. , SM/09104 Retrofitting Repairing and Restoration of damaged and chokaged various Dia UPVC Pipeline and Construction of Valve Chambers to conrrol flow of waer for providing FHTC in JOUGRAM PWSS at Jamalpur Dev.block under Burdwan Division,PHE Dte.Group : D. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000112/2022-2023 1017/BSD 20/06/2022 30 MUKHERJEE ENTERPRISE 1.43 1.39 97.2 1
1090 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Jaugram piped Water Supply Scheme at Jamalpur Block under Burdwan Division PHE. DTE. , SM/09104 Retrofitting Providing FHTC for Dogachia Mouza [(Habitation (Village)] for AMRA piped W/S Scheme, Jamalpur Dev. Block under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000068/2023-2024 2019/BWD 28/04/2023 30 DEY NIRMAN 20.61 2.37 11.5 100
1091 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Jaugram piped Water Supply Scheme at Jamalpur Block under Burdwan Division PHE. DTE. , SM/09104 Retrofitting Continuation work order for Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Ilsora village and Ilsora habitation of JAUGRAM Piped Water Supply Scheme within Burdwan Sub-Divn. under Burdwan Division, PHE. Dte. [Phase - I] [GROUP : ¿6A¿] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. Junior Engineer, R.W.S. Burdwan Sub Division, P.H.E. Dt ORD/001347/2020-2021 4513/BWD 12/11/2020 30 MUKHERJEE ENTERPRISE 4.86 1.98 40.74 100
1092 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Jaugram piped Water Supply Scheme at Jamalpur Block under Burdwan Division PHE. DTE. , SM/09104 Retrofitting Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Moyna Habitation of Jougram Piped Water Supply Scheme within Burdwan Sub-Divn. under Burdwan Division, PHE. Dte. [GROUP - 'B'] ORD/001346/2020-2021 2401/BWD 20/07/2020 30 DEY NIRMAN 4.92 4.05 82.32 100
1093 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Jaugram piped Water Supply Scheme at Jamalpur Block under Burdwan Division PHE. DTE. , SM/09104 Retrofitting Continuation work order for Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Jougram village (Jougram habitation) of Jougram Piped Water Supply Scheme within Burdwan Sub-Divn. under Burdwan Division, PHE. Dte. (Part-B) [SL. No. : 13] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. Junior Engineer, R.W.S. Burdwan Sub Division, P.H.E. Dt ORD/000444/2020-2021 1398/BWD 15/02/2021 15 DEY NIRMAN 4.84 4.84 100 0
1094 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Jaugram piped Water Supply Scheme at Jamalpur Block under Burdwan Division PHE. DTE. , SM/09104 Retrofitting Laying of pipeline for providing FHTC 100% coverage and also construction & installation of Sluice Valve & Valve Chamber to control the flow of water, road restoration work etc. of different Piped W/S Schemes, Block Jamalpur under Burdwan Division, PHE Dte. AE(HQs) Junior Engineer, Burdwan Division ORD/000194/2024-2025 2488/BWD 01/07/2024 550 M/S NATIONAL CONSTRUCTION 480.97 0.00 0 80
1095 PURBA BARDHAMAN Ketugram-I Central Mechanical ANKHONA PIPED WATER SUPPLY SCHEME , SM/15157 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at ANKHONA Water Supply Scheme [ Block- KETUGRAM-1] under CMD, PHE Dte., Dist.- Purba-Bardhaman. Driller In-Charge Junior Engineer ORD/000859/2023-2024 4127/CMD 29/08/2023 30 M/S, N.G. ENTERPRISES. 27.75 0.00 0 0
1096 PURBA BARDHAMAN Ketugram-I Central Drilling ANKHONA PIPED WATER SUPPLY SCHEME , SM/15157 New Providing drilling crew and other allied works for construction of Tube Well (250mm X200mm X 114 Mtrs. Depth) by utilising Departmental Machineries for Ankhona W/S Scheme (T/W-I & II) ,Ketugram-I Block under PurbaBardhman District, Central Drilling Division, P.H.E. Dte. Driller In Charge Junior Engineer ORD/000167/2023-2024 1350/CDD 13/09/2023 30 ASHUTOSH DAS & CO 16.59 0.00 0 0
1097 PURBA BARDHAMAN Ketugram-I Burdwan Division ANKHONA PIPED WATER SUPPLY SCHEME , SM/15157 New Material Requisition To Resource Division RTOR000093/2023-2024 1962/BWD 25/04/2023 0 Resource Division 2.29 0.00 0 0
1098 PURBA BARDHAMAN Ketugram-I Burdwan Division ANKHONA PIPED WATER SUPPLY SCHEME , SM/15157 New Material Requisition To Resource Division RTOR000211/2023-2024 2155/BWD 10/05/2023 0 Resource Division 21.50 0.00 0 0
1099 PURBA BARDHAMAN Ketugram-I Burdwan Division ANKHONA PIPED WATER SUPPLY SCHEME , SM/15157 New Material Requisition To Resource Division RTOR000643/2023-2024 5109/BWD 23/11/2023 0 Resource Division 20.84 0.00 0 0
1100 PURBA BARDHAMAN Ketugram-I Central Mechanical ANKHONA PIPED WATER SUPPLY SCHEME , SM/15157 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Rajur & others water supply scheme under Ketugram-I Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. Driller In-Charge Junior Engineer ORD/000098/2024-2025 2407/CMD 02/08/2024 90 M.S. ENTERPRISE 82.29 0.00 0 0
1101 PURBA BARDHAMAN Ketugram-I Burdwan Division ANKHONA PIPED WATER SUPPLY SCHEME , SM/15157 New Balance work for OHR, extension of pipeline to provide FHTC with sinking of tube well, construction of pump house, boundary wall, land development, plinth protection for pump house, approach road & other related work under Ankhona, Pandugram, Sripur PWSS under Katwa Sub Division, Block- Ketugram-I, Burdwan Division PHE Dte. Assistant Engineer JUNIOR ENGINEER R.W.S. BURDWAN SUB-DIVISION PHE DTE ORD/000286/2024-2025 2738/BWD 12/07/2024 173 PUSPA ENTERPRISE 128.29 0.00 0 75
1102 PURBA BARDHAMAN Ketugram-I Central Mechanical ANKHONA PIPED WATER SUPPLY SCHEME , SM/15157 New Quotation for new service connection Ankhona PWSS TW No.1. BILL/00779/2024-2025 BP-2024-25-293 13/09/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 2.99 0.00 0 0
1103 PURBA BARDHAMAN Ketugram-I Central Mechanical ANKHONA PIPED WATER SUPPLY SCHEME , SM/15157 New Quotation for new service connection Ankhona PWSS TW No. 2. BILL/00778/2024-2025 BP-2024-25-294 13/09/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 2.38 0.00 0 0
1104 PURBA BARDHAMAN Ketugram-I Burdwan Division ANKHONA PIPED WATER SUPPLY SCHEME , SM/15157 New Different works related (sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of different capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site) to ANKHONA, PANDUGRAM & SRIPUR Piped Water Supply Scheme under KETUGRAM¿I Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer JUNIOR ENGINEER R.W.S. BURDWAN SUB-DIVISION PHE DTE ORD/000436/2023-2024 3388/BWD 03/08/2023 882 PUSPA ENTERPRISE 989.13 247.36 25.01 50
1105 PURBA BARDHAMAN Central Mechanical AUGMENTATION OF SEHERA PWSS IN RAINA-I BLOCK , SM/15173 Augmentation Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination system and internal House wiring for Tube well no.- 1 & 2 at Augmentation of SEHERA( Part-B)[RAINA-I] Water Supply Scheme under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER Junior Engineer ORD/001076/2023-2024 4200/CMD 29/08/2023 30 AMUSAR IMPEX PVT. LTD. 24.39 0.00 0 0
1106 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF SEHERA PWSS IN RAINA-I BLOCK , SM/15173 Augmentation Functional Household Tap Connection (FHTC) for Sehera, Mogolmari, Kona Krishnapur village for Augmentation of SEHERA Piped Water Supply Scheme to provide house connection within Burdwan Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/001086/2023-2024 1112/BWD 13/03/2024 60 PAL CONSTRUCTION 35.49 0.00 0 0
1107 PURBA BARDHAMAN Central Mechanical AUGMENTATION OF SEHERA PWSS IN RAINA-I BLOCK , SM/15173 Augmentation Making illumination arrangement and mise works at Aug. of Sheherabazar water supply scheme RAINA-I BLOCK under Central Mechanical Division P.H.E. Dte. Purba-Bardhaman. ASSISTANT ENGINEER Junior Engineer ORD/000481/2024-2025 2952/CMD 20/11/2024 233 ELECTRICAL & MECHANICAL ENGINEERING CORPORATION 17.51 0.00 0 30
1108 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF SEHERA PWSS IN RAINA-I BLOCK , SM/15173 Augmentation Providing leftout FHTC, Const. of Boundary Wall (HW Site & 2nd TW Site), Drain, Pathway and land development at Head Work site & 2nd TW Site (Replacement), Rising main connection of 2nd TW (Replacement) with necessary repairing work for SEHERA Piped Water Supply Scheme, Block- Raina-I, within Burdwan Sub Division under Burdwan Division PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/001017/2024-2025 63/BWD 06/01/2025 90 H SAMANTA 41.78 0.00 0 0
1109 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF SEHERA PWSS IN RAINA-I BLOCK , SM/15173 Augmentation Laying of Interconnection of Head work site New Tube well of Sehera Piped Water Supply Scheme within Burdwan Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. Junior Engineer1, Durgapur Sub-Division, PHE Dte. ORD/001276/2023-2024 738/BSD 20/04/2023 15 M/S UNIT CONSTRUCTION 0.95 0.00 0 100
1110 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF PURBASTHALI SURFACE WATER BASED PWSS ZONE II , SM/16014 Augmentation Digital structurization of pipeline alignment and asset evaluation including holistic design, preparation of design drawings of overall LDS & preparation of estimate for 09 Nos. Piped W/S. Schemes under Purbasthali II Block under Kalna Sub-Division under Burdwan Division, PHE. Dte. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000338/2024-2025 3018/BWD 05/08/2024 50 HORIZEN 23.70 0.18 0.76 10
1111 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF PURBASTHALI SURFACE WATER BASED PWSS ZONE II , SM/16014 Augmentation Material Requisition To Resource Division RTOR000762/2023-2024 196/BWD 10/01/2024 0 Resource Division 6.16 0.00 0 0
1112 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF PURBASTHALI SURFACE WATER BASED PWSS ZONE II , SM/16014 Augmentation Augmentation of PURBASTHALI Surface Water Supply Scheme (ZONE-4B) with LDS, Rising Main, FHTC, Construction of 600 cum capacity RCC OHR with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drain and internal pathway at different TW site under Purbasthali-II Block, District:- Purba-Bardhaman._2ND CALL Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000895/2023-2024 5371/BWD 07/12/2023 570 TAPAS KUMAR CHAKRABORTY & CO. 819.09 21.82 2.66 5
1113 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF PURBASTHALI SURFACE WATER BASED PWSS ZONE II , SM/16014 Augmentation Supply & Laying of 300mm Dia M.S.E.R.W Pipe including Jack Pushing along with other allied work in connection with different Augmentation & New [(SM/18439, SM/14437, SM/14435, SM/07805, SM/14440, SM/15571, SM/08030, SM/16014, SM/15588, SM/16298 & SM/16307)] under Kalna Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/001187/2024-2025 608/BWD 11/02/2025 361 MANASH GHOSH 1,209.62 0.00 0 51
1114 PURBA BARDHAMAN Central Mechanical AUGMENTATION OF EKAIHAT PIPED WATER SUPPLY SCHEME , SM/16017 Augmentation Supply & Installation of Submersible Pumping Machinery , Voltage Stabilizer, Chlorination system and internal House wiring for Tube well no.- 1&2 at Augumentation of Ekaihat Water Supply Scheme under CMD, PHE Dte., Dist.- Purba-Bardhaman. Driller In-Charge Junior Engineer ORD/000090/2023-2024 2583/CMD 07/06/2023 30 M/S. S.R. ENTERPRISE 22.38 0.00 0 0
1115 PURBA BARDHAMAN Central Mechanical AUGMENTATION OF EKAIHAT PIPED WATER SUPPLY SCHEME , SM/16017 Augmentation QUOTATION FOR AUGMENTATION OF EKAIHAT PWSS TW-4 BILL/00664/2024-2025 BP-2024-25-266 20/08/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 7.65 0.00 0 0
1116 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF EKAIHAT PIPED WATER SUPPLY SCHEME , SM/16017 Augmentation Augmentation of EKAIHAT Piped Water Supply Scheme with sinking of Tube-well, LDS, Rising Main, FHTC & Construction of switch rooms & boundary walls with gates and land development, drain and internal pathway at different TW site under KATWA-I Block, District:- Purba-Bardhaman. Assistant Engineer Junior Engineer, R.W.S., Katwa-I Dev. Block ORD/000174/2023-2024 3031/BWD 14/07/2023 627 HAMID SK 130.08 85.39 65.64 100
1117 PURBA BARDHAMAN Ketugram-I Burdwan Division AMEGERIA PIPED WATER SUPPLY SCHEME , SM/16023 New Material Requisition To Resource Division RTOR000091/2023-2024 1962/BWD 25/04/2023 0 Resource Division 2.01 0.00 0 0
1118 PURBA BARDHAMAN Ketugram-I Burdwan Division AMEGERIA PIPED WATER SUPPLY SCHEME , SM/16023 New Material Requisition To Resource Division RTOR000741/2023-2024 5252/BWD 30/11/2023 0 Resource Division 20.18 0.00 0 0
1119 PURBA BARDHAMAN Ketugram-I Central Mechanical AMEGERIA PIPED WATER SUPPLY SCHEME , SM/16023 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Rajur & others water supply scheme under Ketugram-I Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. Driller In-Charge Junior Engineer ORD/000098/2024-2025 2407/CMD 02/08/2024 90 M.S. ENTERPRISE 82.29 0.00 0 0
1120 PURBA BARDHAMAN Ketugram-I Burdwan Division AMEGERIA PIPED WATER SUPPLY SCHEME , SM/16023 New Material Requisition To Resource Division RTOR000772/2023-2024 199/BWD 10/01/2024 0 Resource Division 11.48 0.00 0 0
1121 PURBA BARDHAMAN Ketugram-I Central Mechanical AMEGERIA PIPED WATER SUPPLY SCHEME , SM/16023 New Quotation for new service connection at Amgoria PWSS TW 2. BILL/00445/2024-2025 BP-2024-25-232 30/07/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 0.65 0.00 0 0
1122 PURBA BARDHAMAN Ketugram-I Central Mechanical AMEGERIA PIPED WATER SUPPLY SCHEME , SM/16023 New Quotation for new service connection at Amegeria PWSS PH-I. BILL/00343/2024-2025 BP-2024-25-167 01/07/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 4.43 0.00 0 0
1123 PURBA BARDHAMAN Ketugram-I Burdwan Division AMEGERIA PIPED WATER SUPPLY SCHEME , SM/16023 New Different works related (sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of different capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site) to AMEGERIA, ARGUN, CHINISPUR & KULUTIA Piped Water Supply Scheme under KETUGRAM -I Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer JUNIOR ENGINEER R.W.S. BURDWAN SUB-DIVISION PHE DTE ORD/000533/2023-2024 3630/BWD 21/08/2023 1107 M/S GOUTAM DAS 1,421.70 161.16 11.34 75
1124 PURBA BARDHAMAN Ketugram-I Central Mechanical AMEGERIA PIPED WATER SUPPLY SCHEME , SM/16023 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at AMEGERIA Water Supply Scheme [ Block- KETUGRAM-1] under CMD, PHE Dte., Dist.- Purba-Bardhaman. Driller In-Charge Junior Engineer ORD/000902/2023-2024 4166/CMD 29/08/2023 640 M/S, S.DAS AND ENTERPRISE. 28.48 0.00 0 88
1125 PURBA BARDHAMAN Ketugram-I Burdwan Division AMEGERIA PIPED WATER SUPPLY SCHEME , SM/16023 New Road crossing through metal / concrete road by Jack Push Method for AMEGERIA (SM/16023), ARGUN (SM/16482), CHINISPUR (SM/15170) and KULITIA (SM/15167) PWSS under Ketugram I Development Block under Katwa Sub Division within Burdwan Division, PHE. Dte. Assistant Engineer JUNIOR ENGINEER R.W.S. BURDWAN SUB-DIVISION PHE DTE ORD/001311/2024-2025 977/BWD 13/03/2025 60 M/S GOUTAM DAS 39.22 0.00 0 100
1126 PURBA BARDHAMAN Kalna-II Burdwan Division DAFARPUR PIPED WATER SUPPLY SCHEME , SM/16028 New Material Requisition To Resource Division RTOR000075/2023-2024 1962/BWD 25/04/2023 0 Resource Division 28.10 0.00 0 0
1127 PURBA BARDHAMAN Kalna-II Burdwan Division DAFARPUR PIPED WATER SUPPLY SCHEME , SM/16028 New Material Requisition To Resource Division RTOR000237/2023-2024 2197/BWD 12/05/2023 0 Resource Division 12.02 0.00 0 0
1128 PURBA BARDHAMAN Kalna-II Burdwan Division DAFARPUR PIPED WATER SUPPLY SCHEME , SM/16028 New Work Order for "Hiring of one no. DIESEL MOTOR CAB (BS-VI) (Inspection vehicle) for JJM projects for the Office of the Assistant Engineer, under Kalna Sub-Division within Burdwan Division, P.H.E. Dte. [Period from 01.12.2023 to 31.05.2024]" (Vehicle No-WB 04G 7127) Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/001248/2023-2024 1681/KSD 22/11/2023 183 PARTHA PRATIM ACHARYA 2.40 0.31 12.92 0
1129 PURBA BARDHAMAN Kalna-II Burdwan Division DAFARPUR PIPED WATER SUPPLY SCHEME , SM/16028 New Work Order for "CONSTRUCTION OF TEMPORARY KIOSK FOR THE NECESSARY ARRANGEMENT OF ELECTRIFICATION OF TUBEWELL FOR DAFARPUR PWSS UNDER KALNA SUB-DIVISION UNDER BURDWAN DIVISION, PHE DTE." Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/001148/2023-2024 2104/KSD 04/03/2024 10 ER CONSTRUCTION & GENERAL ORDER SUPPLIER 0.66 0.66 100 2
1130 PURBA BARDHAMAN Kalna-II Burdwan Division DAFARPUR PIPED WATER SUPPLY SCHEME , SM/16028 New Work Order for "Hiring of one no. DIESEL MOTOR CAB (BS-VI) (Inspection vehicle) for JJM projects for the Office of the Assistant Engineer, under Kalna Sub-Division within Burdwan Division, P.H.E. Dte. [Period from 01.12.2023 to 31.05.2024]" (Vehicle No-WB 04G 7127) Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000983/2023-2024 1681/KSD 22/11/2023 183 PARTHA PRATIM ACHARYA 0.87 1.57 180.46 51
1131 PURBA BARDHAMAN Kalna-II Central Mechanical DAFARPUR PIPED WATER SUPPLY SCHEME , SM/16028 New NEW SERVICE CONNECTION FOR DAFARPUR PWSS TW -1. BILL/03103/2023-2024 BP-2023-24-643 15/03/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 20.65 0.00 0 0
1132 PURBA BARDHAMAN Kalna-II Central Mechanical DAFARPUR PIPED WATER SUPPLY SCHEME , SM/16028 New New service at Dafarpur PWSS TW-2. BILL/02292/2023-2024 BP-2023-24-438 29/01/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 4.70 0.00 0 0
1133 PURBA BARDHAMAN Kalna-II Central Mechanical DAFARPUR PIPED WATER SUPPLY SCHEME , SM/16028 New Additional quotation for Dafarpur PWSS PH-2 BILL/00426/2024-2025 BP-2024-25-224 26/07/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.51 0.00 0 0
1134 PURBA BARDHAMAN Kalna-II Burdwan Division DAFARPUR PIPED WATER SUPPLY SCHEME , SM/16028 New Different works related (sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of different capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site) to ANGARSON, BHABANANDAPUR &DAFARPUR Piped Water Supply Scheme under Kalna ¿ II Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE,Junior Engineer, R.W.S. Burdwan Sub Division, P.H.E. Dt ORD/000702/2023-2024 4480/BWD 11/10/2023 724 M/S GHOSH & CO. 1,093.29 82.01 7.5 60
1135 PURBA BARDHAMAN Kalna-II Burdwan Division DAFARPUR PIPED WATER SUPPLY SCHEME , SM/16028 New Continuation work order for "Hiring of one no. DIESEL MOTOR CAB (BS-VI) (Inspection Vehicle) for JJM projects for the Office of the Assistant Engineer, under Kalna Sub-Division within Burdwan Division, P.H.E. Dte. [Period from 01.06.2024 to 30.11.2024]" (Vehicle No-WB 04G 7127) Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000465/2024-2025 272/KSD 30/05/2024 183 PARTHA PRATIM ACHARYA 2.40 1.22 50.83 0
1136 PURBA BARDHAMAN Kalna-II Burdwan Division DAFARPUR PIPED WATER SUPPLY SCHEME , SM/16028 New Continuation work order for "Hiring of one no. DIESEL MOTOR CAB (BS-VI) (Inspection vehicle) for JJM projects for the Office of the Assistant Engineer, under Kalna Sub-Division within Burdwan Division, P.H.E. Dte. [Period from 01.12.2024 to 28.02.2025] [Vehicle No-WB 04G 7127]". Assistant Engineer ORD/001207/2024-2025 1877/KSD 28/11/2024 90 PARTHA PRATIM ACHARYA 1.20 0.00 0 0
1137 PURBA BARDHAMAN Kalna-II Burdwan Division DAFARPUR PIPED WATER SUPPLY SCHEME , SM/16028 New Pipeline laying by HDD method and different types of balance works in connection with different Augmentation & New Scheme [(SM/ 08103), (SM/13413), (SM/15587), (SM/16035), (SM/16287), (SM/16029), (SM/15581), (SM/14437), (SM/16028), (SM/16036) & (SM/14425)] within Kalna Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer ORD/001270/2024-2025 849/BWD 05/03/2025 180 S.P. CONSTRUCTION 683.30 0.00 0 0
1138 PURBA BARDHAMAN Kalna-II Burdwan Division DAFARPUR PIPED WATER SUPPLY SCHEME , SM/16028 New Continual work order for "Hiring of one no. DIESEL MOTOR CAB (BS-VI) (Inspection vehicle) for JJM projects for the Office of the Assistant Engineer, under Kalna Sub-Division within Burdwan Division, P.H.E. Dte. [Period from 01.03.2025 to 31.05.2025] [Vehicle No-WB 04G 7127]". Assistant Engineer ORD/001450/2024-2025 335/KSD 28/02/2025 92 PARTHA PRATIM ACHARYA 1.20 0.00 0 0
1139 PURBA BARDHAMAN Kalna-II Burdwan Division DAFARPUR PIPED WATER SUPPLY SCHEME , SM/16028 New Continual work order for " Hiring of one no. DIESEL MOTOR CAB (BS-VI) (Inspection vehicle) for JJM projects for the Office of the Assistant Engineer, under Kalna Sub-Division within Burdwan Division, P.H.E. Dte. [Period from 01/06/2025 to 31/08/2025] [Vehicle No-WB 04G 7127]". Assistant Engineer ORD/000329/2025-2026 734/KSD 30/05/2025 92 PARTHA PRATIM ACHARYA 1.20 0.00 0 0
1140 PURBA BARDHAMAN Ketugram-I Central Drilling KHANJI PIPED WATER SUPPLY SCHEME , SM/16476 New Providing drilling crew and other allied works or construction of Tube Well (250mm x 200mm x 114 Mtrs. Depth) by utilising Departmental machineries for Khanji Scheme (T/W-i & II) ketugram-I Block under Purba Bardhaman District, CDD PHE Dte. Driller In Charge Junior Engineer ORD/000055/2023-2024 861/CDD 10/07/2023 30 OSMAN SEKH 16.66 13.26 79.59 100
1141 PURBA BARDHAMAN Ketugram-I Burdwan Division KHANJI PIPED WATER SUPPLY SCHEME , SM/16476 New Material Requisition To Resource Division RTOR000099/2023-2024 1962/BWD 25/04/2023 0 Resource Division 5.23 0.00 0 0
1142 PURBA BARDHAMAN Ketugram-I Burdwan Division KHANJI PIPED WATER SUPPLY SCHEME , SM/16476 New Material Requisition To Resource Division RTOR000379/2023-2024 2197/BWD 12/05/2023 0 Resource Division 12.94 0.00 0 0
1143 PURBA BARDHAMAN Ketugram-I Burdwan Division KHANJI PIPED WATER SUPPLY SCHEME , SM/16476 New Material Requisition To Resource Division RTOR000748/2023-2024 5261/BWD 30/11/2023 0 Resource Division 20.18 0.00 0 0
1144 PURBA BARDHAMAN Ketugram-I Central Mechanical KHANJI PIPED WATER SUPPLY SCHEME , SM/16476 New New service connection charges for Khanji PWSS TW-2 BILL/01665/2023-2024 BP-2023-24-223 10/11/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 2.96 0.00 0 0
1145 PURBA BARDHAMAN Ketugram-I Central Mechanical KHANJI PIPED WATER SUPPLY SCHEME , SM/16476 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Rajur & others water supply scheme under Ketugram-I Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. Driller In-Charge Junior Engineer ORD/000098/2024-2025 2407/CMD 02/08/2024 90 M.S. ENTERPRISE 82.29 0.00 0 0
1146 PURBA BARDHAMAN Ketugram-I Central Mechanical KHANJI PIPED WATER SUPPLY SCHEME , SM/16476 New Quotation for new electric service connection at Khanji PWSS TW No-1 BILL/01731/2023-2024 BP-2023-24-270 11/12/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 4.48 0.00 0 0
1147 PURBA BARDHAMAN Ketugram-I Burdwan Division KHANJI PIPED WATER SUPPLY SCHEME , SM/16476 New Different works related (sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of different capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site) to MALGRAM, MURGRAM, MORGRAM & KHANJI Piped Water Supply Scheme under KETUGRAM -I Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer JUNIOR ENGINEER R.W.S. BURDWAN SUB-DIVISION PHE DTE ORD/000435/2023-2024 3387/BWD 03/08/2023 882 PUSPA ENTERPRISE 1,333.98 242.70 18.19 40
1148 PURBA BARDHAMAN Ketugram-I Burdwan Division KHANJI PIPED WATER SUPPLY SCHEME , SM/16476 New Balance work for OHR, extension of pipeline to provide FHTC with sinking of tube well, construction of pump house, boundary wall, land development, plinth protection for pump house, approach road & other related work under Murgram, Moregram, Malgram, Khanji, PWSS under Katwa Sub Division, Block- Ketugram-I, Burdwan Division PHE Dte. Assistant Engineer JUNIOR ENGINEER R.W.S. BURDWAN SUB-DIVISION PHE DTE ORD/000289/2024-2025 2739/BWD 12/07/2024 173 PUSPA ENTERPRISE 185.75 21.14 11.38 72
1149 PURBA BARDHAMAN Ketugram-I Central Mechanical KHANJI PIPED WATER SUPPLY SCHEME , SM/16476 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-3 at Khanji Water Supply Scheme [ BLOCK- Ketugram-I ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. Driller In-Charge Junior Engineer ORD/001389/2024-2025 882/CMD 26/03/2025 60 KAMAKHYA ENTERPRISE 11.62 0.00 0 0
1150 PURBA BARDHAMAN Central Mechanical AUGMENTATION OF BAMANGARIA PIPED WATER SUPPLY SCHEME , SM/16304 Augmentation Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination system and internal House wiring for Tube well no.- 1 & 2 at Augmentation of BAMUNGARIA[PURBASTHALI-I] Water Supply Scheme under CMD, PHE Dte., Dist.- Purba-Bardhaman. ORD/001077/2023-2024 4201/CMD 29/08/2023 30 DAS TRADING CO. 24.41 0.00 0 0
1151 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF BAMANGARIA PIPED WATER SUPPLY SCHEME , SM/16304 Augmentation Augmentation of BAMANGARIA PWSS to accommodate FHTC, Laying Distribution System, Laying Rising Main, under Jal Jeevan Mission of Purbasthali - I Block, Purba Burdwan District under Burdwan Division, PHE.Dte. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000076/2023-2024 2044/BWD 03/05/2023 60 TAPAS KUMAR ROY 38.28 35.67 93.18 100
1152 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF BAMANGARIA PIPED WATER SUPPLY SCHEME , SM/16304 Augmentation Construction of 350cum OHR & Other Allied Works in connection with Augmentation of (SM/07803), (SM/09410), (SM/16304), (SM/15172) & (SM/14020) Piped Water Supply Scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/001048/2024-2025 220/BWD 10/01/2025 270 R.K. MANDAL& CO. 491.79 0.00 0 1
1153 PURBA BARDHAMAN Kalna-II Central Mechanical KHARGAKUR PIPED WATER SUPPLY SCHEME , SM/16035 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at KHARGAKUR Water Supply Scheme [ Block- KALNA-2] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ORD/000893/2023-2024 4156/CMD 29/08/2023 30 S.K. ELECTRICALS 26.96 0.00 0 0
1154 PURBA BARDHAMAN Kalna-II Burdwan Division KHARGAKUR PIPED WATER SUPPLY SCHEME , SM/16035 New Material Requisition To Resource Division RTOR000382/2023-2024 2197/BWD 12/05/2023 0 Resource Division 14.20 0.00 0 0
1155 PURBA BARDHAMAN Kalna-II Burdwan Division KHARGAKUR PIPED WATER SUPPLY SCHEME , SM/16035 New Material Requisition To Resource Division RTOR000399/2023-2024 3842/BWD 01/09/2023 0 Resource Division 6.91 0.00 0 0
1156 PURBA BARDHAMAN Kalna-II Burdwan Division KHARGAKUR PIPED WATER SUPPLY SCHEME , SM/16035 New Material Requisition To Resource Division RTOR000538/2023-2024 4305/BWD 29/09/2023 0 Resource Division 25.37 0.00 0 0
1157 PURBA BARDHAMAN Kalna-II Burdwan Division KHARGAKUR PIPED WATER SUPPLY SCHEME , SM/16035 New KHARGAKUR PWSS Piped Water Supply Scheme with sinking of Tube-well, LDS, Rising Main, FHTC, Construction of 150 cum capacity RCC OHR with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drain and internal pathway at different TW site under Kalna-II Block, District:- Purba-Bardhaman [NEW SCHEME]_2ND CALL Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000556/2023-2024 3751/BWD 28/08/2023 365 MITRA CONSTRUCTION 310.02 161.20 52 15
1158 PURBA BARDHAMAN Kalna-II Burdwan Division KHARGAKUR PIPED WATER SUPPLY SCHEME , SM/16035 New Work Order for "CONSTRUCTION OF TEMPORARY KIOSK FOR THE NECESSARY ARRANGEMENT OF ELECTRIFICATION OF TUBEWELL FOR KHAGRAKUR PWSS UNDER KALNA SUB-DIVISION UNDER BURDWAN DIVISION, PHE DTE." Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/001155/2023-2024 2171/KSD 11/03/2024 10 MITRA CONSTRUCTION 0.66 0.66 100 100
1159 PURBA BARDHAMAN Kalna-II Central Mechanical KHARGAKUR PIPED WATER SUPPLY SCHEME , SM/16035 New Quotation for new electric service connection at Khargakur PH NO.-2 BILL/01745/2023-2024 BP-2023-24-256 07/12/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 4.28 0.00 0 0
1160 PURBA BARDHAMAN Kalna-II Central Mechanical KHARGAKUR PIPED WATER SUPPLY SCHEME , SM/16035 New Quotation for new electric service connection at Khargakur PH NO.-1 BILL/01746/2023-2024 BP-2023-24-257 07/12/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 4.35 0.00 0 0
1161 PURBA BARDHAMAN Kalna-II Central Mechanical KHARGAKUR PIPED WATER SUPPLY SCHEME , SM/16035 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Khargakur & others water supply scheme under Kalna-2 Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000116/2024-2025 2393/CMD 02/08/2024 280 HANNAN BUILDERS PVT LTD 76.80 0.00 0 20
1162 PURBA BARDHAMAN Kalna-II Burdwan Division KHARGAKUR PIPED WATER SUPPLY SCHEME , SM/16035 New Pipeline laying by HDD method and different types of balance works in connection with different Augmentation & New Scheme [(SM/ 08103), (SM/13413), (SM/15587), (SM/16035), (SM/16287), (SM/16029), (SM/15581), (SM/14437), (SM/16028), (SM/16036) & (SM/14425)] within Kalna Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer ORD/001270/2024-2025 849/BWD 05/03/2025 180 S.P. CONSTRUCTION 683.30 0.00 0 0
1163 PURBA BARDHAMAN Kalna-II Burdwan Division KUSDANGA PIPED WATER SUPPLY SCHEME , SM/16036 New Material Requisition To Resource Division RTOR000084/2023-2024 1962/BWD 25/04/2023 0 Resource Division 22.36 0.00 0 0
1164 PURBA BARDHAMAN Kalna-II Burdwan Division KUSDANGA PIPED WATER SUPPLY SCHEME , SM/16036 New Material Requisition To Resource Division RTOR000392/2023-2024 2197/BWD 12/05/2023 0 Resource Division 10.79 0.00 0 0
1165 PURBA BARDHAMAN Kalna-II Burdwan Division KUSDANGA PIPED WATER SUPPLY SCHEME , SM/16036 New Material Requisition To Resource Division RTOR000632/2023-2024 4874/BWD 10/11/2023 0 Resource Division 28.85 0.00 0 0
1166 PURBA BARDHAMAN Kalna-II Central Mechanical KUSDANGA PIPED WATER SUPPLY SCHEME , SM/16036 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System, Internal House Wiring and Compound lighting arrangement for Tube well No.- 1 & 2 at KUSDANGA Water Supply Scheme [BLOCK- KALNA-2] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/001607/2023-2024 1536/CMD 05/03/2024 60 MITRA ENTERPRISE 28.81 11.49 39.88 50
1167 PURBA BARDHAMAN Kalna-II Central Mechanical KUSDANGA PIPED WATER SUPPLY SCHEME , SM/16036 New New Service connection for Kushodanga W/S Scheme. BILL/02278/2023-2024 BP-2023-24-437 29/01/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 5.25 0.00 0 0
1168 PURBA BARDHAMAN Kalna-II Central Mechanical KUSDANGA PIPED WATER SUPPLY SCHEME , SM/16036 New NEW SERVICE CONNECTION FOR KUSDANGA PWSS TW -2. BILL/03107/2023-2024 BP-2023-24-647 15/03/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 4.03 0.00 0 0
1169 PURBA BARDHAMAN Kalna-II Burdwan Division KUSDANGA PIPED WATER SUPPLY SCHEME , SM/16036 New KUSDANGA PWSS Piped Water Supply Scheme with sinking of Tube-well, LDS, Rising Main, FHTC, Construction of 100 cum capacity RCC OHR with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drain and internal pathway at different TW site under Kalna-II Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000706/2023-2024 4523/BWD 12/10/2023 365 SYED KHORSED ALAM 258.80 101.31 39.15 25
1170 PURBA BARDHAMAN Kalna-II Burdwan Division KUSDANGA PIPED WATER SUPPLY SCHEME , SM/16036 New Pipeline laying by HDD method and different types of balance works in connection with different Augmentation & New Scheme [(SM/ 08103), (SM/13413), (SM/15587), (SM/16035), (SM/16287), (SM/16029), (SM/15581), (SM/14437), (SM/16028), (SM/16036) & (SM/14425)] within Kalna Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer ORD/001270/2024-2025 849/BWD 05/03/2025 180 S.P. CONSTRUCTION 683.30 0.00 0 0
1171 PURBA BARDHAMAN Burdwan Division AUGUMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR RASULPUR , SM/15701 Augmentation Sinking of 300 X 200mm dia Tube Well 150 mtr. Depth by D.R. Rig method using UPVC pipe (CD) and UPVC Deep Well Screen (RDS) for SASINARA Z-II W/S Scheme at Kalsi Mouza, RASULPUR W/S Scheme at 4th TW site & ALIPUR W/S Scheme at 4th TW site under Memari-I Block under within Burdwan Sub-Division, PHE Dte. [For 3 Nos. Tube well]. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000159/2023-2024 2455/BWD 31/05/2023 60 SUSUNIA GP CO. OPERATIVE LABOUR CONTRACT AND CONSTRUCTION SOCIETY LTD. 39.76 13.10 32.95 100
1172 PURBA BARDHAMAN Burdwan Division AUGUMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR RASULPUR , SM/15701 Augmentation Preparation and Submission of DPR for Augmentation of Rasulpur PWSS under Memari-I Development Block under Burdwan Division, P.H.E Dte.[2nd Call] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. Junior Engineer, RWS, Memari-I Dev. Bolck ORD/000395/2023-2024 1583/BSD 24/07/2023 15 GEO-SOLUTION 0.78 0.77 98.72 100
1173 PURBA BARDHAMAN Central Mechanical AUGUMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR RASULPUR , SM/15701 Augmentation Supply & Installation of Submersible Pumping Machinery , Voltage Stabilizer, Chlorination system and internal House wiring for Tube well no.- 1&2 at Augumentation of Rasulpur Water Supply Scheme under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER Junior Engineer ORD/000089/2023-2024 2594/CMD 07/06/2023 30 CHOUDHURY ENTERPRISE 22.76 11.08 48.68 50
1174 PURBA BARDHAMAN Burdwan Division AUGUMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR RASULPUR , SM/15701 Augmentation Extension of pipe line and replacing damaged pipe line at Swayerpar Uttar for RASULPUR and its adj.mouza W/S Scheme,Block:Memari-I within Burdwan Sub-Division,PHE Dte Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. Junior Engineer, RWS, Memari-I Dev. Bolck ORD/001174/2023-2024 533/BSD 14/03/2024 30 DEBASHISH ENTERPRISE 0.93 0.00 0 100
1175 PURBA BARDHAMAN Burdwan Division AUGUMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR RASULPUR , SM/15701 Augmentation Installation of air valve with valve Chamber and installation of pressure gauge for improvement of valve pressure at dist.line,repairing valve chamber with RCC cover slab and interconnection of valve chamber with upvc pipe for draining out waste water at Head work site of RASULPUR PWSS under Memari-I Dev.Block under Bardhaman Sadar south sub-Divn,PHE Dte Junior Engineer, RWS, Memari-I Dev. Bolck ORD/000118/2024-2025 997/BSD 06/06/2024 30 DEBASHISH ENTERPRISE 0.83 0.00 0 0
1176 PURBA BARDHAMAN Burdwan Division AUGUMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR RASULPUR , SM/15701 Augmentation Construction of switch rooms & Rising main at different TW site for RASULPUR Piped Water Supply Scheme under Memari - I Block, District:- Purba-Bardhaman under Burdwan Division, PHE. Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. Junior Engineer, RWS, Memari-I Dev. Bolck ORD/000881/2023-2024 5356/BWD 06/12/2023 60 SANDIP SARKAR 7.43 5.45 73.35 95
1177 PURBA BARDHAMAN Central Mechanical AUGUMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR RASULPUR , SM/15701 Augmentation Supply & installation of Automatic Chlorinator at Rasulpur water supply scheme, P.H. No.- II under CMD, P.H.E. Dte., Dist.- Purba Bardhaman. ASSISTANT ENGINEER Junior Engineer ORD/001750/2023-2024 18/CMSD 04/01/2024 12 MS S M ELECTRICAL 0.96 0.96 100 100
1178 PURBA BARDHAMAN Burdwan Division AUGUMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR RASULPUR , SM/15701 Augmentation Extension of height of Boundary Wall by Angle Rolled Section and Barbed Wire and Roof treatment of Pump house for Rasulpur and its Adjoining Mouza W/S Scheme, block -Memari-I within Burdwan Sub-Division ,PHE Dte Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. Junior Engineer, RWS, Memari-I Dev. Bolck ORD/000300/2024-2025 1282/BSD 12/07/2024 60 GHOSH CONSTRUCTION 1.27 1.23 96.85 98
1179 PURBA BARDHAMAN Central Mechanical AUGUMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR RASULPUR , SM/15701 Augmentation Quotation for New Electric Connection for Rasulpur Augmentation W/S Scheme TW No. - 4 BILL/01735/2023-2024 BP-2023-24-254 07/12/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 10.09 0.00 0 0
1180 PURBA BARDHAMAN Burdwan Division AUGUMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR RASULPUR , SM/15701 Augmentation Restoration of concrete road by Cement concrete (mix 1:1.5:3), Providing balance FHTC, parallel pipeline, drainage system, boundary wall, Bridge, land development, Sluice valve chamber for smooth water supply of FHTC work for RASULPUR PWSS and its adjoining mouzas within MEMARI-I BLOCK under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000982/2024-2025 4474/BWD 19/12/2024 90 SARKAR AGENCY 91.74 0.00 0 51
1181 PURBA BARDHAMAN Kalna-II Central Mechanical JIUDHARA PWSS , SM/18314 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1, 2 & 3 at JIUDHARA Water Supply Scheme [ Block- KALNA-2 ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000900/2023-2024 4164/CMD 29/08/2023 30 DUTTA ENTERPRISE 44.40 0.00 0 0
1182 PURBA BARDHAMAN Kalna-II Burdwan Division JIUDHARA PWSS , SM/18314 New Material Requisition To Resource Division RTOR000295/2023-2024 2197/BWD 12/05/2023 0 Resource Division 18.12 0.00 0 0
1183 PURBA BARDHAMAN Kalna-II Burdwan Division JIUDHARA PWSS , SM/18314 New Material Requisition To Resource Division RTOR000629/2023-2024 4877/BWD 10/11/2023 0 Resource Division 26.94 0.00 0 0
1184 PURBA BARDHAMAN Kalna-II Burdwan Division JIUDHARA PWSS , SM/18314 New Material Requisition To Resource Division RTOR000525/2023-2024 4291/BWD 29/09/2023 0 Resource Division 50.47 0.00 0 0
1185 PURBA BARDHAMAN Kalna-II Central Mechanical JIUDHARA PWSS , SM/18314 New New service connection for Jewdhara PWSS PH-1 BILL/02314/2023-2024 BP-2023-24-458 30/01/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 8.55 0.00 0 0
1186 PURBA BARDHAMAN Kalna-II Burdwan Division JIUDHARA PWSS , SM/18314 New JIUDHARA Piped Water Supply Scheme with sinking of Tube-well, LDS, Rising Main, FHTC, Construction of 400 cum capacity RCC OHR with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drain and internal pathway at different TW site under Kalna II Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE,Junior Engineer, R.W.S. Burdwan Sub Division, P.H.E. Dt ORD/000719/2023-2024 4534/BWD 13/10/2023 780 SOMNATH ROY CHOWDHURY 625.16 108.02 17.28 45
1187 PURBA BARDHAMAN Kalna-II Burdwan Division JIUDHARA PWSS , SM/18314 New Different Types of work involved in connection with Augmentation of 6 Nos. [(SM/07827), (SM/07866), (SM/16196), (SM/18314), (SM/16021), (SM/16019)] Piped Water Supply Scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/001144/2024-2025 618/BWD 11/02/2025 180 M/S DATTA ENTERPRISE 578.09 0.00 0 0
1188 PURBA BARDHAMAN Kalna-II Central Mechanical JIUDHARA PWSS , SM/18314 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Khargakur & others water supply scheme under Kalna-2 Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000116/2024-2025 2393/CMD 02/08/2024 280 HANNAN BUILDERS PVT LTD 76.80 0.00 0 20
1189 PURBA BARDHAMAN Khandaghosh Central Mechanical BERUGRAM PIPED WATER SUPPLY SCHEME , SM/18606 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at Berugram Water Supply Scheme [ Block- Khandoghosh ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. [3rd CALL] ASSISTANT ENGINEER Junior Engineer ORD/000932/2023-2024 4195/CMD 29/08/2023 30 M/S, S.DAS AND ENTERPRISE. 29.71 0.00 0 0
1190 PURBA BARDHAMAN Khandaghosh Burdwan Division BERUGRAM PIPED WATER SUPPLY SCHEME , SM/18606 New Material Requisition To Resource Division RTOR000249/2023-2024 2197/BWD 12/05/2023 0 Resource Division 17.09 0.00 0 0
1191 PURBA BARDHAMAN Khandaghosh Burdwan Division BERUGRAM PIPED WATER SUPPLY SCHEME , SM/18606 New Material Requisition To Resource Division RTOR000523/2023-2024 4289/BWD 29/09/2023 0 Resource Division 16.32 0.00 0 0
1192 PURBA BARDHAMAN Khandaghosh Burdwan Division BERUGRAM PIPED WATER SUPPLY SCHEME , SM/18606 New Material Requisition To Resource Division RTOR000655/2023-2024 5114/BWD 23/11/2023 0 Resource Division 20.46 0.00 0 0
1193 PURBA BARDHAMAN Khandaghosh Burdwan Division BERUGRAM PIPED WATER SUPPLY SCHEME , SM/18606 New Land demarcation and preparation of sketch map for Haldi, Sultanpur, Berugram & Karail Piped W/S. Scheme (New Scheme) at different Blocks under JJM under Burdwan Division, PHE Dte. AE(HQs) J.E. 1 BURDWAN ORD/000756/2023-2024 842/AE/HQ 01/11/2023 15 M/S S. CHOUDHURY 0.33 0.00 0 100
1194 PURBA BARDHAMAN Khandaghosh Central Mechanical BERUGRAM PIPED WATER SUPPLY SCHEME , SM/18606 New New Service connection for Berugram PWSS TW-2. BILL/02333/2023-2024 BP-2023-24-475 31/01/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 7.69 0.00 0 0
1195 PURBA BARDHAMAN Khandaghosh Central Mechanical BERUGRAM PIPED WATER SUPPLY SCHEME , SM/18606 New Quotation for new service connection at Berugram W/S Scheme PH-I. BILL/01804/2023-2024 BP-2023-24-323 30/12/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 2.94 0.00 0 0
1196 PURBA BARDHAMAN Khandaghosh Burdwan Division BERUGRAM PIPED WATER SUPPLY SCHEME , SM/18606 New Different works related (sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of different capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site) to BERUGRAM & SULTANPUR Piped Water Supply Scheme under Khandaghosh Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer ORD/000979/2023-2024 092/BWD 05/01/2024 604 SK ALIM 1,368.51 287.39 21 55
1197 PURBA BARDHAMAN Khandaghosh Burdwan Division BERUGRAM PIPED WATER SUPPLY SCHEME , SM/18606 New Continuation for the work of Supply of Inspection Vehicle for inspection of different JJM related (Schemes) works as and when required including supply of driver & fuel (minimum 8 Hours duty per day) and all taxes etc. for Durgapur Sub-Division under Burdwan Division, P.H.E. Dte.consider 96.00 Km. run per day. [PeriodFebruary.'2025 to April'2025] ORD/001180/2024-2025 129/DSD 29/01/2025 78 MD HASIN 1.00 0.00 0 0
1198 PURBA BARDHAMAN Khandaghosh Burdwan Division BERUGRAM PIPED WATER SUPPLY SCHEME , SM/18606 New Continuation for the work of Supply of Inspection Vehicle for inspection of different JJM related (Schemes) works as and when required including supply of driver & fuel (minimum 8 Hours duty per day) and all taxes etc. for Durgapur Sub-Division under BurdwanDivision, P.H.E. Dte.consider 96.00 Km. run per day [Period NOV.'2024 to JAN.'2025] ORD/000847/2024-2025 886/DSD 21/10/2024 78 MD HASIN 1.00 0.33 33 0
1199 PURBA BARDHAMAN Khandaghosh Burdwan Division BERUGRAM PIPED WATER SUPPLY SCHEME , SM/18606 New Continuation for the work of Supply of Inspection Vehicle for inspection of different JJM related (Schemes) works as and when required including supply of driver & fuel (minimum 8 Hours duty per day) and all taxes etc. for Durgapur Sub-Division under BurdwanDivision, P.H.E. Dte.consider 96.00 Km. run per day [Period AUG.'2024 to OCT.'2024] ORD/000845/2024-2025 575/DSD 19/07/2024 78 MD HASIN 1.00 0.18 18 0
1200 PURBA BARDHAMAN Khandaghosh Central Mechanical BERUGRAM PIPED WATER SUPPLY SCHEME , SM/18606 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at KHEJURHATI & others water supply scheme under Khandoghosh Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman ASSISTANT ENGINEER Junior Engineer ORD/000071/2024-2025 2391/CMD 02/08/2024 90 C.M. ENTERPRISE 45.81 0.00 0 10
1201 PURBA BARDHAMAN Khandaghosh Burdwan Division BERUGRAM PIPED WATER SUPPLY SCHEME , SM/18606 New Balance work of BERUGRAM & SULTANPUR Piped Water Supply Scheme with sinking of Tube-well, LDS, FHTC & construction of switch rooms & boundary walls with gates and land development, drain and internal pathway at different TW site under Khandaghosh Block, District:- Purba-Bardhaman. Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/001214/2024-2025 723/BWD 24/02/2025 180 MD HASIN 438.83 0.00 0 0
1202 PURBA BARDHAMAN Khandaghosh Burdwan Division BERUGRAM PIPED WATER SUPPLY SCHEME , SM/18606 New Continuation for Supply of Inspection Vehicle for inspection of different JJM related (Schemes) works as and when required including supply of driver & fuel (minimum 8 Hours duty per day) and all taxes etc. for Durgapur Sub-Division under Burdwan Division, P.H.E. Dte. consider 96.00 Km. run per day for the month of May'2025 ORD/000142/2025-2026 660/DSD 30/04/2025 31 MD HASIN 0.40 0.00 0 0
1203 PURBA BARDHAMAN Ketugram-I Central Drilling EHIAPUR PIPED WATER SUPPLY SCHEME , SM/18342 New Providing drilling crew and other allied works for construction of Tube Well (250mm X200mm X 114 Mtrs. Depth) by utilising Departmental Machineries for Ehiapur W/S Scheme (T/W-I & II) ,Ketugram-I Block under PurbaBardhman District, Central Drilling Division, P.H.E. Dte. Driller In Charge Junior Engineer ORD/000163/2023-2024 1348/CDD 13/09/2023 30 CHANDA ENTERPRISE 16.67 0.00 0 0
1204 PURBA BARDHAMAN Ketugram-I Burdwan Division EHIAPUR PIPED WATER SUPPLY SCHEME , SM/18342 New Material Requisition To Resource Division RTOR000250/2023-2024 2197/BWD 12/05/2023 0 Resource Division 4.15 0.00 0 0
1205 PURBA BARDHAMAN Ketugram-I Burdwan Division EHIAPUR PIPED WATER SUPPLY SCHEME , SM/18342 New Material Requisition To Resource Division RTOR000398/2023-2024 3874/BWD 01/09/2023 0 Resource Division 64.94 0.00 0 0
1206 PURBA BARDHAMAN Ketugram-I Burdwan Division EHIAPUR PIPED WATER SUPPLY SCHEME , SM/18342 New Material Requisition To Resource Division RTOR000576/2023-2024 4924/BWD 10/11/2023 0 Resource Division 40.35 0.00 0 0
1207 PURBA BARDHAMAN Ketugram-I Central Mechanical EHIAPUR PIPED WATER SUPPLY SCHEME , SM/18342 New New service connection charges for Ehiapur PWSS TW-1 BILL/01470/2023-2024 BP-2023-24-168 27/09/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 5.42 0.00 0 0
1208 PURBA BARDHAMAN Ketugram-I Burdwan Division EHIAPUR PIPED WATER SUPPLY SCHEME , SM/18342 New EHIAPUR Piped Water Supply Scheme with sinking of Tube-well, LDS, Rising Main, FHTC, Construction of 400 cum capacity RCC OHR with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drain and internal pathway at different TW site under KETUGRAM -I Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer JUNIOR ENGINEER R.W.S. BURDWAN SUB-DIVISION PHE DTE ORD/000456/2023-2024 3438/BWD 08/08/2023 365 M/S S.S. ENTERPRISE 732.05 606.31 82.82 75
1209 PURBA BARDHAMAN Ketugram-I Central Mechanical EHIAPUR PIPED WATER SUPPLY SCHEME , SM/18342 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Rajur & others water supply scheme under Ketugram-I Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. Driller In-Charge Junior Engineer ORD/000098/2024-2025 2407/CMD 02/08/2024 90 M.S. ENTERPRISE 82.29 0.00 0 0
1210 PURBA BARDHAMAN Ketugram-I Burdwan Division EHIAPUR PIPED WATER SUPPLY SCHEME , SM/18342 New Material Requisition To Resource Division RTOR000013/2024-2025 4111/BWD 25/11/2024 0 Resource Division 9.24 0.00 0 0
1211 PURBA BARDHAMAN Ketugram-I Central Mechanical EHIAPUR PIPED WATER SUPPLY SCHEME , SM/18342 New New service connection charges for Ehiapur PWSS TW-3 BILL/01726/2023-2024 BP-2023-24-258 07/12/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 6.52 0.00 0 0
1212 PURBA BARDHAMAN Ketugram-I Central Mechanical EHIAPUR PIPED WATER SUPPLY SCHEME , SM/18342 New New service connection charges for Ehiapur PWSS TW-2 BILL/01727/2023-2024 BP-2023-24-259 07/12/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 2.82 0.00 0 0
1213 PURBA BARDHAMAN Ketugram-I Central Mechanical EHIAPUR PIPED WATER SUPPLY SCHEME , SM/18342 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1, 2 & 3 at EHIAPUR Water Supply Scheme [ Block- KETUGRAM-1 ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. Driller In-Charge Junior Engineer ORD/000843/2023-2024 4115/CMD 29/08/2023 615 ASHIM UDYOG 44.39 35.13 79.14 61
1214 PURBA BARDHAMAN Ketugram-I Burdwan Division EHIAPUR PIPED WATER SUPPLY SCHEME , SM/18342 New Balance Work For OHR, Extension Of Pipeline To Provide FHTC With Sinking Of Tube Well, Construction Of Pump House, Boundary Wall, Land Development, Plinth Protection For Pump House, Approach Road & Other Related Work Under Bakalsa, Chakdaha, Ehaipur, Khatundi And Ketugram (Zone-I) Part-A & B PWSS Under Katwa Sub Division, Block- Ketugram-I, Burdwan Division PHE Dte. Assistant Engineer JUNIOR ENGINEER R.W.S. BURDWAN SUB-DIVISION PHE DTE ORD/000288/2024-2025 2741/BWD 12/07/2024 415 M/S M.M. ENTERPRISE 205.15 7.34 3.58 65
1215 PURBA BARDHAMAN Mangolkote Central Mechanical HALIMPUR PIPE WATER SUPPLY SCHEME , SM/18343 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1, 2 & 3 at HALIMPUR Water Supply Scheme [ Block- MANGOLKOTE ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. Driller In-Charge Junior Engineer ORD/000871/2023-2024 4134/CMD 29/08/2023 30 P.K. ENGINEERING 45.29 0.00 0 0
1216 PURBA BARDHAMAN Mangolkote Burdwan Division HALIMPUR PIPE WATER SUPPLY SCHEME , SM/18343 New Material Requisition To Resource Division RTOR000274/2023-2024 2197/BWD 12/05/2023 0 Resource Division 16.69 0.00 0 0
1217 PURBA BARDHAMAN Mangolkote Burdwan Division HALIMPUR PIPE WATER SUPPLY SCHEME , SM/18343 New Material Requisition To Resource Division RTOR000408/2023-2024 3872/BWD 01/09/2023 0 Resource Division 1.27 0.00 0 0
1218 PURBA BARDHAMAN Mangolkote Burdwan Division HALIMPUR PIPE WATER SUPPLY SCHEME , SM/18343 New Material Requisition To Resource Division RTOR000571/2023-2024 4921/BWD 10/11/2023 0 Resource Division 27.49 0.00 0 0
1219 PURBA BARDHAMAN Mangolkote Central Mechanical HALIMPUR PIPE WATER SUPPLY SCHEME , SM/18343 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Jabagram & others water supply scheme under Mangalkote Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. Driller In-Charge Junior Engineer ORD/000118/2024-2025 2590/CMD 27/08/2024 90 M/S SAJAHAN CHOWDHURY 62.06 0.00 0 0
1220 PURBA BARDHAMAN Mangolkote Burdwan Division HALIMPUR PIPE WATER SUPPLY SCHEME , SM/18343 New Continuation Work Order for Supply of 1 (one) No. Inspection Vehicle for different JJM Related Works as and when required including supply of driver and fuels (Minimum 8 Hours of duty) under Katwa Sub-Division within Burdwan Division, P.H.E. Dte. Consider 96.00 Km run per Day Assistant Engineer JUNIOR ENGINEER KATWA SUB-DIVISION PHE DTE ORD/000107/2024-2025 485/KTS 16/04/2024 72 AJIT SAMANTA 0.92 0.23 25 10
1221 PURBA BARDHAMAN Mangolkote Burdwan Division HALIMPUR PIPE WATER SUPPLY SCHEME , SM/18343 New Material Requisition To Resource Division RTOR000015/2024-2025 4109/BWD 25/11/2024 0 Resource Division 6.90 0.00 0 0
1222 PURBA BARDHAMAN Mangolkote Central Mechanical HALIMPUR PIPE WATER SUPPLY SCHEME , SM/18343 New Quotation for new service connection at Halimpur PWSS TW-1 BILL/01086/2024-2025 BP-2024-25-396 22/11/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 5.11 0.00 0 0
1223 PURBA BARDHAMAN Mangolkote Burdwan Division HALIMPUR PIPE WATER SUPPLY SCHEME , SM/18343 New Different works related (sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of different capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site) to CHAKULIA, KULSANA & HALIMPUR Piped Water Supply Scheme under MONGALKOTE Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer J.E. katwa,JUNIOR ENGINEER R.W.S. BURDWAN SUB-DIVISION PHE DTE ORD/000461/2023-2024 3443/BWD 08/08/2023 836 ASHOK KUMAR GHOSH 1,588.10 45.62 2.87 15
1224 PURBA BARDHAMAN Mangolkote Burdwan Division HALIMPUR PIPE WATER SUPPLY SCHEME , SM/18343 New Balance work of HALIMPUR Piped Water Supply Scheme with sinking of Tube-well, LDS, FHTC & construction of switch rooms & boundary walls with gates and land development, drain and internal pathway at different TW site under Mongalkote Block, District:- Purba-Bardhaman Assistant Engineer ORD/001261/2024-2025 845/BWD 05/03/2025 120 M/S H.R. CONSTRUCTION 248.04 0.00 0 0
1225 PURBA BARDHAMAN Mangolkote Burdwan Division KULSANA PIPE WATER SUPPLY SCHEME , SM/18440 New Material Requisition To Resource Division RTOR000389/2023-2024 2197/BWD 12/05/2023 0 Resource Division 1.75 0.00 0 0
1226 PURBA BARDHAMAN Mangolkote Burdwan Division KULSANA PIPE WATER SUPPLY SCHEME , SM/18440 New Material Requisition To Resource Division RTOR000406/2023-2024 3826/BWD 01/09/2023 0 Resource Division 4.47 0.00 0 0
1227 PURBA BARDHAMAN Mangolkote Central Mechanical KULSANA PIPE WATER SUPPLY SCHEME , SM/18440 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Jabagram & others water supply scheme under Mangalkote Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. Driller In-Charge Junior Engineer ORD/000118/2024-2025 2590/CMD 27/08/2024 90 M/S SAJAHAN CHOWDHURY 62.06 0.00 0 0
1228 PURBA BARDHAMAN Mangolkote Burdwan Division KULSANA PIPE WATER SUPPLY SCHEME , SM/18440 New Continuation Work Order for Supply of 1 (one) No. Inspection Vehicle for different JJM Related Works as and when required including supply of driver and fuels (Minimum 8 Hours of duty) under Katwa Sub-Division within Burdwan Division, P.H.E. Dte. Consider 96.00 Km run per Day Assistant Engineer JUNIOR ENGINEER KATWA SUB-DIVISION PHE DTE ORD/000107/2024-2025 485/KTS 16/04/2024 72 AJIT SAMANTA 0.92 0.23 25 10
1229 PURBA BARDHAMAN Mangolkote Central Drilling KULSANA PIPE WATER SUPPLY SCHEME , SM/18440 New Providing drilling crew and other allied works for construction of Tube Well (250mm X150mm X 240 Mtrs. Depth) by utilizing Departmental Machineries for Kulsana W/S Scheme (T/W-I & II), Block- Mangolkote under Purba Bardhman District, Central Drilling Division, P.H.E. Dte. Assistant Engineer Junior Engineer ORD/000154/2023-2024 1341/CDD 13/09/2023 322 SUNRISE ENGINEERING CORPORATION 23.34 19.11 81.88 100
1230 PURBA BARDHAMAN Mangolkote Burdwan Division KULSANA PIPE WATER SUPPLY SCHEME , SM/18440 New Material Requisition To Resource Division RTOR000801/2023-2024 308/BWD 24/01/2024 0 Resource Division 32.08 0.00 0 0
1231 PURBA BARDHAMAN Mangolkote Burdwan Division KULSANA PIPE WATER SUPPLY SCHEME , SM/18440 New Material Requisition To Resource Division RTOR000007/2024-2025 4099/BWD 25/11/2024 0 Resource Division 20.51 0.00 0 0
1232 PURBA BARDHAMAN Mangolkote Central Mechanical KULSANA PIPE WATER SUPPLY SCHEME , SM/18440 New QUOTATION FOR NEW SERVICE CONNECTION AT KULSANA PWSS TW-1 BILL/00367/2024-2025 BP-2024-25-187 08/07/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 5.91 0.00 0 0
1233 PURBA BARDHAMAN Mangolkote Central Mechanical KULSANA PIPE WATER SUPPLY SCHEME , SM/18440 New Quotation for new service connection at Kulsana PWSS TW-2 BILL/00376/2024-2025 BP-2024-25-186 08/07/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 6.43 0.00 0 0
1234 PURBA BARDHAMAN Mangolkote Burdwan Division KULSANA PIPE WATER SUPPLY SCHEME , SM/18440 New Different works related (sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of different capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site) to CHAKULIA, KULSANA & HALIMPUR Piped Water Supply Scheme under MONGALKOTE Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer J.E. katwa,JUNIOR ENGINEER R.W.S. BURDWAN SUB-DIVISION PHE DTE ORD/000461/2023-2024 3443/BWD 08/08/2023 836 ASHOK KUMAR GHOSH 1,588.10 252.57 15.9 15
1235 PURBA BARDHAMAN Mangolkote Central Mechanical KULSANA PIPE WATER SUPPLY SCHEME , SM/18440 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1, 2 & 3 at KULSANA Water Supply Scheme [ Block-MANGOLKOTE] under CMD, PHE Dte., Dist.- Purba-Bardhaman. Driller In-Charge Junior Engineer ORD/000876/2023-2024 4139/CMD 29/08/2023 640 M/S, S.S. ENTERPRISE. 44.56 3.11 6.98 43
1236 PURBA BARDHAMAN Mangolkote Burdwan Division KULSANA PIPE WATER SUPPLY SCHEME , SM/18440 New Balance work of KULSANA Piped Water Supply Scheme with sinking of Tube-well, LDS, FHTC & construction of switch rooms & boundary walls with gates and land development, drain and internal pathway at different TW site under Mongalkote Block, District:- Purba-Bardhaman. Assistant Engineer ORD/001303/2024-2025 935/BWD 11/03/2025 120 M/S GHOSH CONSTRUCTION 249.53 0.00 0 0
1237 PURBA BARDHAMAN Katwa-II Burdwan Division AURIA PIPED WATER SUPPLY SCHEME , SM/18455 New Material Requisition To Resource Division RTOR000213/2023-2024 2155/BWD 10/05/2023 0 Resource Division 17.33 0.00 0 0
1238 PURBA BARDHAMAN Katwa-II Burdwan Division AURIA PIPED WATER SUPPLY SCHEME , SM/18455 New Material Requisition To Resource Division RTOR000433/2023-2024 3853/BWD 01/09/2023 0 Resource Division 64.75 0.00 0 0
1239 PURBA BARDHAMAN Katwa-II Central Mechanical AURIA PIPED WATER SUPPLY SCHEME , SM/18455 New New service connection charges for Auria PWSS TW-1 BILL/01518/2023-2024 BP-2023-24-188 09/10/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.89 0.00 0 0
1240 PURBA BARDHAMAN Katwa-II Central Mechanical AURIA PIPED WATER SUPPLY SCHEME , SM/18455 New New service connection charges for Auria PWSS TW-2 BILL/01519/2023-2024 BP-2023-24-189 09/10/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.77 0.00 0 0
1241 PURBA BARDHAMAN Katwa-II Central Mechanical AURIA PIPED WATER SUPPLY SCHEME , SM/18455 New New service connection charges for Auria PWSS TW-3 BILL/01520/2023-2024 BP-2023-24-190 09/10/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 7.00 0.00 0 0
1242 PURBA BARDHAMAN Katwa-II Central Mechanical AURIA PIPED WATER SUPPLY SCHEME , SM/18455 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Mulgram & others water supply scheme under Katwa-II Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. ASSISTANT ENGINEER Junior Engineer ORD/000070/2024-2025 2409/CMD 02/08/2024 90 DUTTA ENTERPRISE 50.18 0.00 0 0
1243 PURBA BARDHAMAN Katwa-II Central Mechanical AURIA PIPED WATER SUPPLY SCHEME , SM/18455 New Supply and installation of Electro-Magnetic flow meter at AURIA, KARUI & others water supply scheme under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. Driller In-Charge JUNIOR ENGINEER ORD/000602/2024-2025 3106/CMD 11/12/2024 60 S.K. ELECTRICALS 13.60 0.00 0 0
1244 PURBA BARDHAMAN Katwa-II Burdwan Division AURIA PIPED WATER SUPPLY SCHEME , SM/18455 New Different works related (sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of different capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site) to AMUL & AURIA Piped Water Supply Scheme under Katwa ¿ II Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer JUNIOR ENGINEER KATWA SUB-DIVISION PHE DTE ORD/000389/2023-2024 3198/BWD 24/07/2023 707 MANASH GHOSH 1,418.89 658.51 46.41 48
1245 PURBA BARDHAMAN Katwa-II Burdwan Division AURIA PIPED WATER SUPPLY SCHEME , SM/18455 New Continuation work order for Hiring of one no Diesel Motor Cab (BS-VI) including the cost of fuel . mobile & other charges for the inspection of the different projects of JJM for the office of the Assistant Engineer, Katwa Sub-Division, PHE Dte. (Period:- 01/09/2025 to 28/02/2026) ORD/000723/2025-2026 1907/KTS 01/09/2025 181 HAMID SK 1.84 0.00 0 0
1246 PURBA BARDHAMAN Burdwan-II Burdwan Division HATSIMUL PIPED WATER SUPPLY SCHEME , SM/18409 New Material Requisition To Resource Division RTOR000441/2023-2024 3846/BWD 01/09/2023 0 Resource Division 17.48 0.00 0 0
1247 PURBA BARDHAMAN Burdwan-II Burdwan Division HATSIMUL PIPED WATER SUPPLY SCHEME , SM/18409 New Material Requisition To Resource Division RTOR000277/2023-2024 2197/BWD 12/05/2023 0 Resource Division 2.25 0.00 0 0
1248 PURBA BARDHAMAN Burdwan-II Burdwan Division HATSIMUL PIPED WATER SUPPLY SCHEME , SM/18409 New Material Requisition To Resource Division RTOR000671/2023-2024 5076/BWD 23/11/2023 0 Resource Division 20.46 0.00 0 0
1249 PURBA BARDHAMAN Burdwan-II Central Mechanical HATSIMUL PIPED WATER SUPPLY SCHEME , SM/18409 New Electric quotation for New Service Connection at Hatsimul W/S Scehem PH-I. BILL/01771/2023-2024 BP-2023-24-29 26/12/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 4.13 0.00 0 0
1250 PURBA BARDHAMAN Burdwan-II Central Mechanical HATSIMUL PIPED WATER SUPPLY SCHEME , SM/18409 New Electric quotation for New Service Connection at Hatsimul W/S Scehem PH-II. BILL/01772/2023-2024 BP-2023-24-293 26/12/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 5.12 0.00 0 0
1251 PURBA BARDHAMAN Burdwan-II Burdwan Division HATSIMUL PIPED WATER SUPPLY SCHEME , SM/18409 New Different works related (sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of different capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site) to ICHALABAD & HATSIMUL Piped Water Supply Scheme under Burdwan ¿ II Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. Junior Engineer, Burdwan Sadar Sub-Division ORD/000423/2023-2024 3292/BWD 31/07/2023 885 M/S NATIONAL CONSTRUCTION 1,617.18 268.40 16.6 60
1252 PURBA BARDHAMAN Burdwan-II Central Mechanical HATSIMUL PIPED WATER SUPPLY SCHEME , SM/18409 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at KUSHA & others water supply scheme under Bardhaman-II Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman ASSISTANT ENGINEER Junior Engineer ORD/000065/2024-2025 2389/CMD 02/08/2024 90 DILIP MAHATO 53.14 0.00 0 12
1253 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Berwa Piped Water Supply Scheme , SM/06965 Retrofitting Formal Work Order for Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of Barwa Piped Water Supply Scheme at Berwa (2 Nos Habitation Part), Mutra (2 Nos Habitation Part), Baneswarpur & Senpur (4 Nos Habitation) Village (Mouza), Memari-II Block under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000647/2020-2021 916/BWD 02/02/2021 90 KALYAN CHOWDHURY 45.14 0.00 0 1
1254 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Berwa Piped Water Supply Scheme , SM/06965 Retrofitting Continuation work order for Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Barwa village of Barwa piped water supply scheme within Burdwan Sub-Division under Burdwan Division, PHE Dte. [Phase-I](Tr No.-573/BWD/2020-21) Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000471/2020-2021 4627/BWD 25/11/2020 30 M/S SAYAN CHAKRABORTY 4.92 9.84 200 1
1255 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Berwa Piped Water Supply Scheme , SM/06965 Retrofitting Formal Work Order for Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of Barwa Piped Water Supply Scheme at Berwa (2 Nos Habitation Part), Mutra (2 Nos Habitation Part), Baneswarpur & Senpur (4 Nos Habitation) Village (Mouza), Memari-II Block under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000038/2021-2022 3442/BWD 28/06/2021 90 KALYAN CHOWDHURY 45.14 41.90 92.82 100
1256 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Berwa Piped Water Supply Scheme , SM/06965 Retrofitting Extension of 75 mm dia pipeline at Miya Para, Modhya Bohar & Bhagar Para Purba Bohar regarding FHTC under Satgachia (Zone-I) water supply scheme under Burdwan Division, PHE Dte.[Gr.-A] Assistant Engineer ,Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000350/2021-2022 703/BSD 11/06/2021 5 M/S SAYAN CHAKRABORTY 0.88 0.00 0 1
1257 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Berwa Piped Water Supply Scheme , SM/06965 Retrofitting Emergency repaired cleaning of chokage AC Pipeline for BARWA Piped Water Supply Scheme (Retrrofittings)at Mutra, senpur, Mohanpur & Barwa village distribution line smooth drinking (FHTC) water supply within Memari-II Block under Burdwan Division, PHE Dte. Gr.C Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000563/2022-2023 1919/BSD 11/11/2022 15 A R TRADERS 0.79 0.79 100 1
1258 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Berwa Piped Water Supply Scheme , SM/06965 Retrofitting Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Bohar (Part) village (Bohar (Part) habitation) of Satgachia Piped Water Supply Scheme within Burdwan Sub-Divn. under Burdwan Division, PHE. Dte. [Sl. No. : ¿20¿] ORD/000667/2020-2021 70/BWD 05/01/2021 15 M/S SAYAN CHAKRABORTY 4.86 4.79 98.56 0
1259 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Berwa Piped Water Supply Scheme , SM/06965 Retrofitting Restoration of Pump House at Head Work site of BARWA Piped water supply scheme at Memari-II Block under Burdwan Division, Dist.-Purba Bardhaman Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER RWS BURDWAN SUB-DIVISION PHE DTE ORD/000133/2024-2025 1007/BSD 06/06/2024 30 I.S. ENTERPRISE 0.97 0.96 98.97 100
1260 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Berwa Piped Water Supply Scheme , SM/06965 Retrofitting Different Types of work involved in connection with different Augmentation & Retrofitting Schemes (06 Nos.) Piped Water Supply Scheme under Memari II Block within Burdwan Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/001269/2024-2025 848/BWD 05/03/2025 120 PROJECT INDIA 394.29 0.00 0 0
1261 PURBA BARDHAMAN Burdwan Division Providing Functional House Hold Tap Connection (FHTC) by retrofitting within the command area of Shaktigarh Piped Water Supply Scheme , SM/07204 Retrofitting Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Saktigarh (Pt-A) village of Saktigarh piped water supply scheme within Burdwan Sub-Division under Burdwan Division, PHE Dte. [Phase-I](Tr No.-172/BWD/2020-21) Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000098/2020-2021 2747/BWD 10/08/2020 30 SARKAR AGENCY 4.92 9.84 200 1
1262 PURBA BARDHAMAN Burdwan Division Providing Functional House Hold Tap Connection (FHTC) by retrofitting within the command area of Shaktigarh Piped Water Supply Scheme , SM/07204 Retrofitting Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Saktigarh (Pt-B) village of Shaktigarh Piped Water Supply Scheme within Burdwan Sub-Divn. under Burdwan Division, PHE. Dte. [Phase - I] [GROUP : ¿8B¿] (T.R. No.-380/BWD/2020-21) Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000151/2020-2021 2742/BWD 10/08/2020 30 T.K. BANERJEE & CO. 4.91 9.83 200.2 1
1263 PURBA BARDHAMAN Burdwan Division Providing Functional House Hold Tap Connection (FHTC) by retrofitting within the command area of Shaktigarh Piped Water Supply Scheme , SM/07204 Retrofitting Continuation work order for Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Saktigarh (Pt-A) village of Shaktigarh Piped Water Supply Scheme within Burdwan Sub-Divn. under Burdwan Division, PHE. Dte. [Phase - I] [GROUP : ¿8A¿] (T.R. No. 428/BWD/2020-21) Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000150/2020-2021 3801/BWD 08/10/2020 30 SARKAR AGENCY 4.92 9.84 200 1
1264 PURBA BARDHAMAN Burdwan Division Providing Functional House Hold Tap Connection (FHTC) by retrofitting within the command area of Shaktigarh Piped Water Supply Scheme , SM/07204 Retrofitting Providing Functional Household Tap connection (FHTC) from existing distribution system within the command area of Saktigarh Piped water supply scheme at Shaktigarh village, Burdwan-II Block under Burdwan Division, PHE Dte. [Tr No.-101/SE/CC/2020-21] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000403/2020-2021 715/BWD 28/01/2021 60 SARKAR AGENCY 62.17 58.02 93.32 1
1265 PURBA BARDHAMAN Burdwan Division Providing Functional House Hold Tap Connection (FHTC) by retrofitting within the command area of Shaktigarh Piped Water Supply Scheme , SM/07204 Retrofitting Continuation work order for Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Shaktigarh (Part-B) village of Shaktigarh piped water supply scheme within Burdwan Sub-Division under Burdwan Division, PHE Dte. [Phase-I](Tr No.-649/BWD/2020-21) Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000253/2020-2021 4271/BWD 03/11/2020 30 T.K. BANERJEE & CO. 4.91 9.83 200.2 1
1266 PURBA BARDHAMAN Burdwan Division Providing Functional House Hold Tap Connection (FHTC) by retrofitting within the command area of Shaktigarh Piped Water Supply Scheme , SM/07204 Retrofitting Construction of Pump House cum chlorine room without sanitary and water supply arrangement at 2nd tube well site for Shaktigarh & its adjoining mouzas water supply scheme , Block-Bardhaman-II under Burdwan Division, PHE Dte.[Gr.-G] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000754/2021-2022 1391/BSD 07/10/2021 60 DEBJYOTI GOSWAMI 2.77 2.53 91.34 1
1267 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting at Gangatikuri PWSS , SM/06750 Retrofitting Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of GANGATIKURI Piped Water Supply Scheme at Ketugram-II Block under Burdwan Division, PHE Dte. AE(HQs) J.E. 2 BURDWAN ORD/000706/2020-2021 1007/BWD 05/02/2021 90 M/S ASOKE GHOSH & BROTHERS 47.52 29.44 61.95 1
1268 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting at Gangatikuri PWSS , SM/06750 Retrofitting Supply of 10 mm NB Gun-Metal Ferrule conforming to IS:2692-1989 for water tap connection in each house hold from existing distribution system within scheme jurisdiction in different piped water supply scheme within Katwa Sub-Division under Burdwan Division, PHE Dte. and delivered at Barsul Divisional Store.[Part-4] ORD/000108/2021-2022 3186/BWD 08/06/2021 30 R.K. INDUSTRIES 76.05 40.71 53.53 0
1269 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) under the command area of Uddharanpur Piped Water Supply Scheme , SM/07546 Retrofitting Formal Work Order for Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of Uddharanpur Piped Water Supply Scheme at Enayetpur, Naihati, Sankhai, Sitahati & Uddharanpur (1 No Habitation) Village (Mouza), Ketugram-II Block under Burdwan Division, PHE Dte. (Agreement No. 97/SE/CC/PHE/Dte of 2020-2021) Assistant Engineer ORD/000416/2020-2021 913/BWD 02/02/2021 60 SATYANARAYAN ENGINEERS CO. OP. SOCIETY LTD. 86.77 52.73 60.77 1
1270 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) under the command area of Uddharanpur Piped Water Supply Scheme , SM/07546 Retrofitting Extension of pipe line from the existing Distribution System within scheme jurisdiction at Uddharanpur village under UDDHARANPUR PWSS under Katwa Sub-Division under Burdwan Division PHE Dte.(Sl No-2) Assistant Engineer ORD/000141/2021-2022 590/KTS 06/09/2021 30 M/S S. CHOUDHURY 4.83 4.82 99.79 1
1271 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) under the command area of Uddharanpur Piped Water Supply Scheme , SM/07546 Retrofitting Extension of pipe line from the existing Distribution System within scheme jurisdiction at Naihati village under UDDHARANPUR PWSS under Katwa Sub-Division under Burdwan Division PHE Dte. (Sl No-3) Assistant Engineer ORD/000142/2021-2022 591/KTS 06/09/2021 30 M/S S. CHOUDHURY 4.83 4.81 99.59 1
1272 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) under the command area of Uddharanpur Piped Water Supply Scheme , SM/07546 Retrofitting Extension of pipe line from the existing Distribution System within scheme jurisdiction at Enayatpur and Sankhai village under UDDHARANPUR PWSS under Katwa Sub-Division under Burdwan Division PHE Dte. (Sl No-1) Assistant Engineer ORD/000140/2021-2022 589/KTS 06/09/2021 30 M/S S. CHOUDHURY 4.85 4.85 100 1
1273 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) under the command area of Uddharanpur Piped Water Supply Scheme , SM/07546 Retrofitting Drinking water supply to 10 Nos ICDS for Uddharanpur water supply scheme Ketugram-II Block under Katwa Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer ORD/000961/2020-2021 36/KTS 18/01/2021 30 MAA KHEPIMAYER CHARANE 4.79 0.02 0.42 1
1274 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) under the command area of Mahindar Piped Water Supply Scheme , SM/07550 Retrofitting Material Requisition To Resource Division RTOR000055/2022-2023 5523/BWD 23/12/2022 0 Resource Division 0.62 0.00 0 0
1275 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) under the command area of Mahindar Piped Water Supply Scheme , SM/07550 Retrofitting Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of Mahindar Piped Water Supply Scheme at Mahindar Village (2 Nos habitations), Faimpur Village, Shitalpur Village, Sahapur Village (2 Nos. habitations & Parbatpur Village (2 Nos. habitations), Jamalpur Block under Burdwan Division, PHE Dte. [Agreement No. 684/BWD OF 2020-2021.] AE(HQs) ORD/000301/2020-2021 1456/BWD 18/02/2021 60 S.S. CONSTRUCTION 73.07 71.59 97.97 1
1276 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) under the command area of Mahindar Piped Water Supply Scheme , SM/07550 Retrofitting Continuation work order for Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Madhabpur village and Madhabpur habitation of MADHABPUR Piped Water Supply Scheme within Burdwan Sub-Divn. under Burdwan Division, PHE. Dte. [Phase - I] [GROUP : ¿7C¿] AE(HQs),Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000846/2020-2021 7050/BWD 22/12/2020 30 KAJAL MUKHERJEE 4.86 0.38 7.82 1
1277 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) under the command area of Mahindar Piped Water Supply Scheme , SM/07550 Retrofitting Laying of uPVC pipe for providing FHTC at Faimpur, Parbatpur, Sahapur, Silatpur and Mahindar Village within Mahindar Piped Water Supply Scheme, Jamalpur Block under Burdwan Division P.H.E Dte._Gr. F AE(HQs) ORD/000631/2021-2022 128/AE/HQ 04/03/2022 15 M/S S. CHOUDHURY 4.82 4.81 99.79 1
1278 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) under the command area of Mahindar Piped Water Supply Scheme , SM/07550 Retrofitting Providing Functional Household Tap Connection (FHTC) at Sahapur and Faimpur village within the command area of MAHINDAR Piped Water Supply Scheme at Jamalpur Block under Burdwan Division, PHE Dte. [Group : D] AE(HQs) ORD/000048/2022-2023 202/AE/HQ 06/04/2022 30 DEBJYOTI GOSWAMI 4.84 4.81 99.38 1
1279 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) under the command area of Mahindar Piped Water Supply Scheme , SM/07550 Retrofitting Laying of rising main for interconnection of Pump House No 1 & 2 and distribution main alongwith bypass arrangement for Over Head Reservoir for Mahindar Piped water supply scheme within Jamalpur Block under Burdwan Division, PHE Dte. [Gr.-D] AE(HQs) ORD/000957/2020-2021 1229/AE/HQ 10/02/2021 30 APORUPA CONSTRUCTION 4.97 0.00 0 1
1280 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) under the command area of Mahindar Piped Water Supply Scheme , SM/07550 Retrofitting Providing Functional Household Tap Connection (FHTC) at Parbatpur village within the command area of MAHINDAR Piped Water Supply Scheme at Jamalpur Block under Burdwan Division, PHE Dte. [Group : A] AE(HQs) ORD/000040/2022-2023 227/AE/HQ 19/04/2022 30 M/S S. CHOUDHURY 4.78 4.78 100 1
1281 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) under the command area of Mahindar Piped Water Supply Scheme , SM/07550 Retrofitting Providing Functional Household Tap Connection (FHTC) at Mahindar village within the command area of MAHINDAR Piped Water Supply Scheme at Jamalpur Block under Burdwan Division, PHE Dte. [Group : E] AE(HQs) ORD/000049/2022-2023 203/AE/HQ 06/04/2022 30 M/S ASHA CONSTRUCTION 4.85 4.84 99.79 1
1282 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) under the command area of Mahindar Piped Water Supply Scheme , SM/07550 Retrofitting Repairing of concrete road damaged due to laying of pipeline within command area of MAHINDER PWSS under Burdwan Division PHE Dte. AE(HQs) J.E. 2 BURDWAN ORD/000560/2023-2024 760/AE/HQ 23/08/2023 30 GHOSH CONSTRUCTION 2.68 2.12 79.1 100
1283 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) under the command area of Mahindar Piped Water Supply Scheme , SM/07550 Retrofitting Construction of approach road to get to the Head works site of MAHINDAR Piped Water Supply Scheme, Jamalpur Block under Burdwan Division P.H.E Dte._2ND CALL [Group : G] AE(HQs) ORD/000051/2022-2023 205/AE/HQ 06/04/2022 30 APORUPA CONSTRUCTION 4.84 0.00 0 100
1284 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) under the command area of Siptai Piped Water Supply Scheme , SM/07551 Retrofitting Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of Siptai Piped Water Supply Scheme at Shrimanpur Village, Siptai Village, Ilampur Village, Prijpur Village & Gohaldaha Village, Jamalpur Block under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. Junior Engineer, R.W.S. Burdwan Sub Division, P.H.E. Dt ORD/000024/2021-2022 3342/BWD 21/06/2021 45 ASHOK KUMAR GHOSH 41.90 80.84 192.94 1
1285 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) under the command area of Siptai Piped Water Supply Scheme , SM/07551 Retrofitting Extension of pipeline including FHTC for Siptai Piped Water Supply Scheme at Ilampur (30 Nos) habitation for Sajal Gram (As per FIELD VERIFICATION REPORT DULY SIGNED BY PRADHAN FOR HAR GHAR JAL CERTIFICATION) within Jamalpur Block under Burdwan Division, PHE Dte. Gr.S. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. Junior Engineer, R.W.S. Burdwan Sub Division, P.H.E. Dt ORD/000355/2022-2023 1394/BSD 08/08/2022 5 ROY CONSTRUCTION 0.96 0.00 0 1
1286 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) under the command area of Siptai Piped Water Supply Scheme , SM/07551 Retrofitting Extension of pipeline including providing FHTC for SIPTAI Piped Water Supply Scheme at Pirijpur 40 No¿s Habitation for Sajal Gram (As per FIELD VERIFICATION REPORT FOR HAR GHAR JAL CERTIFICATION within Jamalpur under Burdwan Division, PHE Dte. Gr.Q. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. Junior Engineer, R.W.S. Burdwan Sub Division, P.H.E. Dt ORD/000353/2022-2023 1392/BSD 08/08/2022 5 ROY CONSTRUCTION 0.95 0.95 100 1
1287 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) under the command area of Siptai Piped Water Supply Scheme , SM/07551 Retrofitting Extension of pipeline including providing FHTC for SIPTAI Piped Water Supply Scheme at Siptai (42 Nos) Habitation for Sajal Gram (As per FIELD VERIFICATION REPORT DULY SIGNED BY PRADHAN FOR HAR GHAR JAL CERTIFICATION) within Jamalpur Block under Burdwan Division, PHE Dte. Gr.R Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. Junior Engineer, R.W.S. Burdwan Sub Division, P.H.E. Dt ORD/000354/2022-2023 1393/BSD 08/08/2022 5 ROY CONSTRUCTION 0.97 0.00 0 100
1288 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) under the command area of Siptai Piped Water Supply Scheme , SM/07551 Retrofitting Extension of pipeline including FHTC for SIPTAI Piped Water Supply Scheme at Pirijpur (40 Nos) Habitation for Sajal Gram (As per field verification report duly signed by Pradhan for Har Ghar Jal Certification) within Jamalpur Block under Burdwan Division, PHE Dte. ORD/000849/2022-2023 1392-A/BSD 08/08/2022 5 ROY CONSTRUCTION 0.95 0.00 0 0
1289 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) under the command area of Siptai Piped Water Supply Scheme , SM/07551 Retrofitting Extension of pipeline including FHTC for SIPTAI Piped Water Supply Scheme at Siptai (42 Nos) Habitation for Sajal Gram (As per field verification report duly signed by Pradhan for Har Ghar Jal Certification) within Jamalpur Block under Burdwan Division, PHE Dte. ORD/000850/2022-2023 1393-A/BSD 08/08/2022 5 ROY CONSTRUCTION 0.97 0.97 100 100
1290 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) under the command area of Siptai Piped Water Supply Scheme , SM/07551 Retrofitting Extension of pipeline including providing FHTC for Siptai Piped Water Supply Scheme at Ilampur[30 No's],Habitation for Sajal Gram (As per Sajal Gram(As per Field Verification Report duly signed by Pradhan for Har Ghar Jal Certification)within Jamalpur Block under Burdwan Division, PHE Dte. ORD/000851/2022-2023 1394-A/BSD 08/08/2022 5 ROY CONSTRUCTION 0.96 0.96 100 100
1291 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) under the command area of Siptai Piped Water Supply Scheme , SM/07551 Retrofitting Providing FHTC for 100% coverage at Srimanpur (Village) (Habitation) for SIPTAI Piped W/S Scheme, Jamalpur Dev. Block under Burdwan Division, PHE Dte. AE(HQs) Junior Engineer, Burdwan Division ORD/000921/2023-2024 5487/BWD 13/12/2023 30 GOUTAM KUMAR MITRA 4.34 4.30 99.08 100
1292 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) under the command area of Siptai Piped Water Supply Scheme , SM/07551 Retrofitting Additional work for laying of UPVC pipeline for providing FHTC at Srimanpur (Village) (Habitation) under SIPTAI Piped W/S. Scheme, Jamalpur Dev. Block under Burdwan Division, PHE Dte. AE(HQs) Junior Engineer, Burdwan Division ORD/001030/2023-2024 99/AE/HQ 15/02/2024 30 GOUTAM KUMAR MITRA 0.72 0.72 100 100
1293 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) under the command area of Shushuni Piped Water Supply Scheme , SM/07557 Retrofitting Continuation work order for water tap connection in each household from existing distribution system within scheme jurisdiction in Kuli habitation of Shushunia piped water supply scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. [Gr.-H] Assistant Engineer ORD/000910/2020-2021 4787./BWD 02/12/2020 30 SUSUNIA GP CO. OPERATIVE LABOUR CONTRACT AND CONSTRUCTION SOCIETY LTD. 2.92 1.91 65.41 1
1294 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) under the command area of Shushuni Piped Water Supply Scheme , SM/07557 Retrofitting Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of Shushuni Piped Water Supply Scheme at Shushuni (Part) (Ghoshpara & Sethpur habitation) Village (Mouza), Monteswar Block under Burdwan Division, PHE Dte. [Agreement No.661/BWD OF 2020-2021] AE(HQs) J.E. 2 BURDWAN ORD/000300/2020-2021 1152/BWD 09/02/2021 30 SUSUNIA GP CO. OPERATIVE LABOUR CONTRACT AND CONSTRUCTION SOCIETY LTD. 19.79 5.40 27.29 1
1295 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) under the command area of Shushuni Piped Water Supply Scheme , SM/07557 Retrofitting Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of Shushuni Piped Water Supply Scheme at Shushuni (Part) (Tentulia Bogpara habitation), Budhpur & Kalswar Village (Mouza), Monteswar Block under Burdwan Division, PHE Dte.[Agreement No. 660/BWD OF 2020-2021] Assistant Engineer ORD/000333/2020-2021 1151/BWD 09/02/2021 30 SUSUNIA GP CO. OPERATIVE LABOUR CONTRACT AND CONSTRUCTION SOCIETY LTD. 22.80 9.63 42.24 1
1296 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) under the command area of Shushuni Piped Water Supply Scheme , SM/07557 Retrofitting Work order for Restoration of road and base concreting in FHTC for retrofitting of Shushunia water supply scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer ORD/000131/2023-2024 427/KSD 11/05/2023 30 SUSUNIA GP CO. OPERATIVE LABOUR CONTRACT AND CONSTRUCTION SOCIETY LTD. 0.60 0.57 95 100
1297 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) under the command area of Shushuni Piped Water Supply Scheme , SM/07557 Retrofitting Laying of UPVC pipeline for smooth running of FHTC work of SHUSHUNIA Water Supply Scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer ORD/000115/2023-2024 2342/BWD 22/05/2023 30 SUSUNIA GP CO. OPERATIVE LABOUR CONTRACT AND CONSTRUCTION SOCIETY LTD. 22.26 21.07 94.65 100
1298 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) under the command area of Shushuni Piped Water Supply Scheme , SM/07557 Retrofitting Designing, Making and Erection of Sign Board for SAJAL GRAM in Kuli Village, Monteswar Block within Susunia PWSS under Burdwan Division, PHE Dte. (5 Nos Board) AE(HQs) J.E. 1 BURDWAN ORD/000734/2023-2024 827/AE/HQ 30/10/2023 30 ISHAN CONSTRUCTION 0.76 0.72 94.74 100
1299 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) under the command area of Shushuni Piped Water Supply Scheme , SM/07557 Retrofitting Designing, Making and Erection of Sign Board for SAJAL GRAM in Budhpur Village, Monteswar Block within Susunia PWSS under Burdwan Division, PHE Dte. (5 Nos Board) AE(HQs) J.E. 1 BURDWAN ORD/000735/2023-2024 828/AE/HQ 30/10/2023 30 ISHAN CONSTRUCTION 0.76 0.72 94.74 100
1300 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting withinthe command area of Gopikantapur Piped Water Supply Scheme at Jamalpur Block , SM/07775 Retrofitting Formal Work Order for Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of Gopikantapur Piped Water Supply Scheme at Bishnubati, Chakdighi & Dhapdhara Village (Mouza), Jamalpur Block under Burdwan Division, PHE Dte. [Agreement No. 96/SE/CC/PHE/Dte of 2020-2021.] AE(HQs),Assistant Engineer ORD/000439/2020-2021 716/BWD 28/01/2021 45 BHARAT CONSTRUCTION 47.00 16.87 35.89 1
1301 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting withinthe command area of Gopikantapur Piped Water Supply Scheme at Jamalpur Block , SM/07775 Retrofitting Hire & fuel charges of vehicle (Car No.-WB-41H-3668) for the office of the Assistant Engineer, RWS Burdwan Sub-Division, PHE Dte. for the month of May & June'22. VCH/000494/2022-2023 462/VEH/22-23 29/08/2022 0 MD HASIN 0.51 0.00 0 0
1302 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting withinthe command area of Gopikantapur Piped Water Supply Scheme at Jamalpur Block , SM/07775 Retrofitting Supply of materials for different water supply scheme under Burdwan Division, PHE Dte. VCH/001237/2021-2022 1132/DW 26/02/2022 0 EXECUTIVE ENGINEER, RESOURCES DIVISION, P.H.E. DTE. 221.00 0.00 0 0
1303 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting withinthe command area of Gopikantapur Piped Water Supply Scheme at Jamalpur Block , SM/07775 Retrofitting Formal Work Order for Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of Gopikantapur Piped Water Supply Scheme at Kubajpur, Pranballabhpur (2 Nos Habitation) & Ramchandrapur Village (Mouza), Jamalpur Block under Burdwan Division, PHE Dte. [Agreement No. 98/SE/CC/PHE/Dte of 2020-2021.] AE(HQs),Assistant Engineer ORD/000417/2020-2021 914/BWD 02/02/2021 60 S.S. CONSTRUCTION 62.95 37.03 58.82 1
1304 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting withinthe command area of Gopikantapur Piped Water Supply Scheme at Jamalpur Block , SM/07775 Retrofitting Construction of 400 cum capacity 20 Mtr. staging height RCC Over Head Reservoir including pipe connection and cost of pipes, specials for Gopikantapur & it's adjoining mouzas W/S. scheme under Burdwan Division, P.H.E. Dte.Ref. Drawing No.PC-I/OHR/11/2012 (Sheet No.1&2)(R-I) Dated 20.06.2012. [Revision - 1 dt. 20.12.2012] AE(HQs),Assistant Engineer ORD/000438/2021-2022 696/BWD 02/02/2022 180 M/S JAN MAHAMMAD 76.26 0.00 0 0
1305 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting withinthe command area of Gopikantapur Piped Water Supply Scheme at Jamalpur Block , SM/07775 Retrofitting Laying of uPVC pipeline due to obstruction arise for PWD roads within Gopikantapur W/S Scheme under Burdwan Division, PHE Dte. [Group: ¿F¿] AE(HQs),Assistant Engineer ORD/000222/2021-2022 1817/AE/HQ 21/09/2021 30 M/S S. CHOUDHURY 3.55 0.00 0 1
1306 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting withinthe command area of Gopikantapur Piped Water Supply Scheme at Jamalpur Block , SM/07775 Retrofitting Extension of pipeline (Branch & Sub Branch) for Functional House Hold Tap Connection from existing distribution system within the command area of GOPIKANTAPUR Piped Water Supply Scheme, at Bhairabpur village, Jamalpur Block under Burdwan Division P.H.E Dte._Gr-H AE(HQs),Assistant Engineer ORD/000633/2021-2022 130/AE/HQ 04/03/2022 15 D.M. ENTERPRISE 2.37 0.00 0 1
1307 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting withinthe command area of Gopikantapur Piped Water Supply Scheme at Jamalpur Block , SM/07775 Retrofitting Laying of HDPE and UPVC pipe for providing FHTC at Pranballabhpur Village within GOPIKANTAPUR Piped Water Supply Scheme, Jamalpur Block under Burdwan Division P.H.E Dte._Gr-G AE(HQs),Assistant Engineer ORD/000662/2021-2022 148/AE/HQ 16/03/2022 20 OM ENTERPRISE 4.80 0.00 0 1
1308 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting withinthe command area of Gopikantapur Piped Water Supply Scheme at Jamalpur Block , SM/07775 Retrofitting Continuation work order for water tap connection in each house hold from existing distribution system within scheme jurisdiction in Bhairabpur Habitation of Gopikantapur piped water supply scheme within Headquarters under Burdwan Division, PHE Dte. AE(HQs),Assistant Engineer ORD/000562/2021-2022 4818/BWD 22/09/2021 30 D.M. ENTERPRISE 3.76 3.76 100 1
1309 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting withinthe command area of Gopikantapur Piped Water Supply Scheme at Jamalpur Block , SM/07775 Retrofitting Laying of UPVC pipe for providing FHTC in different habitaion of Ramchandrapur, Pranballabpur Mouza within Gopikantapur piped water supply scheme within Jamalpur Block under Burdwan Division, PHE Dte. [Gr.-B] AE(HQs),Assistant Engineer ORD/000768/2021-2022 1856/AE/HQ 05/10/2021 30 M/S S. CHOUDHURY 4.82 4.82 100 1
1310 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting withinthe command area of Gopikantapur Piped Water Supply Scheme at Jamalpur Block , SM/07775 Retrofitting Laying of uPVC pipe for providing FHTC at Gopikantapur, Ramchandrapur and Bishnubati Village within Gopikantapur Piped Water Supply Scheme, Jamalpur Block under Burdwan Division P.H.E Dte._Gr-G AE(HQs),Assistant Engineer ORD/000632/2021-2022 129/AE/HQ 04/03/2022 15 S.S. CONSTRUCTION 3.71 0.00 0 1
1311 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting withinthe command area of Gopikantapur Piped Water Supply Scheme at Jamalpur Block , SM/07775 Retrofitting Material Requisition To Resource Division RTOR000117/2021-2022 1102/BWD 26/02/2022 0 Resource Division 8.61 0.00 0 0
1312 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting withinthe command area of Gopikantapur Piped Water Supply Scheme at Jamalpur Block , SM/07775 Retrofitting Preparation and Submission of DPR for Augmentation of Ground Water Based Piped Water Supply Scheme for GOPIKANTAPUR, Block:Jamalpur under Burdwan Division, P.H.E Dte. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000989/2024-2025 1911/BSD 28/08/2024 15 MEASURE LAND 0.78 0.00 0 0
1313 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting withinthe command area of Gopikantapur Piped Water Supply Scheme at Jamalpur Block , SM/07775 Retrofitting Sinking of 300 mm X 200 mm dia Tube Well 150 mtr. Depth by D.R. Rig method using UPVC pipe (CM) and UPVC Medium Well Screen (RMS) with construction of Pump House & Boundary wall of GOPIKANTAPUR Piped Water Supply Scheme, Block- Jamalpur, District:- Purba-Bardhaman under Burdwan Division PHE Dte. [FOR 3rd. TUBE WELL SITE]. AE(HQs) Junior Engineer, Burdwan Division ORD/001043/2023-2024 786/BWD 27/02/2024 440 BIBHUTI SHAW 23.90 0.00 0 40
1314 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting withinthe command area of Gopikantapur Piped Water Supply Scheme at Jamalpur Block , SM/07775 Retrofitting Construction of Boundary wall, Land Development for various PWSS, Block- Jamalpur, District:- Purba-Bardhaman within Burdwan Sub Division under Burdwan Division PHE Dte. AE(HQs),AE(HQs), Burdwan Division, PHE Dte. Junior Engineer, Burdwan Division ORD/001100/2024-2025 433/BWD 20/01/2025 120 RABINDRA NATH GORANG 132.64 0.00 0 40
1315 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Mahachanda Piped Water Supply Scheme at Bhatar Block , SM/07867 Retrofitting Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Nunari village and Bandh-O-Tawra & Nunari habitation of MAHACHANDA piped water supply scheme within Durgapur (Bardhaman North) Sub-Division under Burdwan Division, PHE Dte. [Phase-I](Tr No.-529/BWD/2020-21) Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000166/2020-2021 3344/BWD 18/09/2020 30 PAPRI HAZRA 4.86 9.71 199.79 1
1316 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Mahachanda Piped Water Supply Scheme at Bhatar Block , SM/07867 Retrofitting Continuation work order for Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Nunari village and Bandh-O-Tawra & Nunari habitation of MAHACHANDA piped water supply scheme within Durgapur (Bardhaman North) Sub-Division under Burdwan Division, PHE Dte. [Phase-I](Tr No.-530/BWD/2020-21) Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000170/2020-2021 4006/BWD 14/10/2020 30 PAPRI HAZRA 4.79 9.57 199.79 1
1317 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Mahachanda Piped Water Supply Scheme at Bhatar Block , SM/07867 Retrofitting Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Mahachanda village (Iymapara & Mahachanda (Part) habitation) of Mahachanda Piped Water Supply Scheme within Durgapur Sub-Divn. under Burdwan Division, PHE. Dte. [SL. No. : 01] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000411/2020-2021 577/BWD 25/01/2021 15 S. MONDAL 4.86 4.86 100 1
1318 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Mahachanda Piped Water Supply Scheme at Bhatar Block , SM/07867 Retrofitting Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Mahachanda (Part) village (Aymapara & Mahachanda (P) habitation) of Mahachanda Piped Water Supply Scheme within Durgapur Sub-Divn. under Burdwan Division, PHE. Dte [SL. No. : 15] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000461/2020-2021 1466/BWD 18/02/2021 15 BARABELUN NO.-II G.P. UNEMPLOYED CO-OP LABOUR CONTRACT & CONSTRUCTION SOCIETY LTD. 4.86 4.78 98.35 1
1319 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Mahachanda Piped Water Supply Scheme at Bhatar Block , SM/07867 Retrofitting Continuation work order for Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Nunari village (Patuna habitation) & Parhat village (Parhat habitation) of Mahachanda Piped Water Supply Scheme within Durgapur Sub-Divn. under Burdwan Division, PHE. Dte. (Part - B) [SL. No. : 04] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000202/2021-2022 6266/BWD 02/11/2021 15 PAPRI HAZRA 4.86 4.78 98.35 1
1320 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Mahachanda Piped Water Supply Scheme at Bhatar Block , SM/07867 Retrofitting Restoration of damaged flanks during laying of distribution pipe with jhama metal and moorum of Bardhaman Katwa road from Shibpur towards 6th Mile ( From Node 89 -64) of Mahachanda Water Supply Scheme within Durgapur Sub Division Under Burdwan Division, PHE Dte.[SL-D] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000624/2021-2022 165/DSD 16/03/2022 30 PREMANANDA ROY BISWAS 3.89 0.00 0 1
1321 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Mahachanda Piped Water Supply Scheme at Bhatar Block , SM/07867 Retrofitting Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Mahachanda village and Mahachanda habitation of MAHACHANDA piped water supply scheme within Durgapur (Bardhaman North) Sub-Division under Burdwan Division, PHE Dte. [Phase-I](Tr No.-527/BWD/2020-21) Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000163/2020-2021 3343/BWD 18/09/2020 30 BIPLAB SAMANTA 4.86 9.71 199.79 1
1322 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Mahachanda Piped Water Supply Scheme at Bhatar Block , SM/07867 Retrofitting Continuation work order for Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Mahachanda village and Mahachanda habitation of MAHACHANDA piped water supply scheme within Durgapur (Bardhaman North) Sub-Division under Burdwan Division, PHE Dte. (Tr No.-528/BWD/20-21) Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000164/2020-2021 4270/BWD 03/11/2020 30 BIPLAB SAMANTA 4.86 9.71 199.79 1
1323 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Mahachanda Piped Water Supply Scheme at Bhatar Block , SM/07867 Retrofitting Continuation work order for Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Nunari village (Patuna habitation) & Parhat village (Parhat habitation) of Mahachanda Piped Water Supply Scheme within Durgapur Sub-Divn. under Burdwan Division, PHE. Dte. (Part - A) [SL. No. : 03] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000203/2021-2022 6265/BWD 02/11/2021 15 BIPLAB SAMANTA 4.86 4.86 100 1
1324 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Mahachanda Piped Water Supply Scheme at Bhatar Block , SM/07867 Retrofitting Restoration of pipeline at 6-Mile_Shibpur-Dharampur along & across Bardhaman-Katwa Road (SH-7) & providing FHTC at Aimapara (Part), Mahachanda (Part), Shibpur, Dharampur, Nunari (Part) Village (Mouza) under MAHACHANDA Piped W/S. Scheme under Burdwan Division, PHE. Dte. Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000277/2021-2022 6934/BWD 13/12/2021 45 PREMANANDA ROY BISWAS 43.33 41.32 95.36 1
1325 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Mahachanda Piped Water Supply Scheme at Bhatar Block , SM/07867 Retrofitting Extension of Pipeline for Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of Mahachanda Piped Water Supply Scheme , Block- Bhatar within Durgapur (Burdwan North) Sub Division under Burdwan Division, P.H.E. Dte. [Gr.-D] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000478/2021-2022 97/DSD 18/02/2022 30 BIPLAB SAMANTA 3.54 3.54 100 1
1326 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Mahachanda Piped Water Supply Scheme at Bhatar Block , SM/07867 Retrofitting Restoration of damaged flanks during laying of distribution pipe with jhama metal and moorum of Bardhaman Katwa road from Shibpur towards 6th Mile ( From Node 89 -64) of Mahachanda Water Supply Scheme within Durgapur Sub Division Under Burdwan Division, PHE Dte.[SL-D] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000638/2021-2022 165/DSD 16/03/2022 30 OM ENTERPRISE 3.88 3.86 99.48 1
1327 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Mahachanda Piped Water Supply Scheme at Bhatar Block , SM/07867 Retrofitting Laying of parallel line with 90 mm dia uPVC pipe within Node J8-J-48 and providing air valve for improvement of water supply to FHTC at Twara village within MAHACHANDA and its adjoining mouzas W/S Scheme under Durgapur Sub-Division, Burdwan Division, P.H.E. Dte. Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000467/2022-2023 3967/BWD 13/09/2022 30 PAPRI HAZRA 5.26 4.99 94.87 1
1328 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Mahachanda Piped Water Supply Scheme at Bhatar Block , SM/07867 Retrofitting Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Mahachanda village (Shibpur-Dharampur habitation) of Mahachanda Piped Water Supply Scheme within Durgapur Sub-Divn. under Burdwan Division, PHE. Dte. [SL. No. : 02] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000453/2020-2021 578/BWD 25/01/2021 15 PRONAB KUMAR DEY 4.86 4.86 100 1
1329 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Mahachanda Piped Water Supply Scheme at Bhatar Block , SM/07867 Retrofitting Providing leftout water tap connection in different villages for 100% coverage to make it Sajal Gram from existing distribution system within scheme jurisdiction of different Piped Water Supply Schemes within Bhatar Block under Burdwan Division, PHE. Dte. Assistant Engineer ,Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000389/2021-2022 268/BWD 14/01/2022 30 BHARAT CONSTRUCTION 14.17 0.00 0 1
1330 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Mahachanda Piped Water Supply Scheme at Bhatar Block , SM/07867 Retrofitting Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Nunari village (Patuna habitation) & Parhat village (Parhat habitation) of Mahachanda Piped Water Supply Scheme within Durgapur Sub-Divn. under Burdwan Division, PHE. Dte. (Part - A) [SL. No. : 03] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer ORD/000454/2020-2021 582/BWD 25/01/2021 15 BIPLAB SAMANTA 4.86 9.73 200.21 0
1331 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Mahachanda Piped Water Supply Scheme at Bhatar Block , SM/07867 Retrofitting Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Nunari village (Patuna habitation) & Parhat village (Parhat habitation) of Mahachanda Piped Water Supply Scheme within Durgapur Sub-Divn. under Burdwan Division, PHE. Dte. (Part - B) [SL. No. : 04] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer ORD/000459/2020-2021 583/BWD 25/01/2021 15 PAPRI HAZRA 4.86 9.68 199.18 0
1332 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Mahachanda Piped Water Supply Scheme at Bhatar Block , SM/07867 Retrofitting Extension of pipeline at Parhat & Patuna village of Mahachanda and its adjoining mouza's Piped W/S Scheme at Bhatar Block within Durgapur (Bardhaman North) Sub Division under Burdwan Division, P.H.E. Dte. (Gr.-C) Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000107/2021-2022 418/DSD 02/07/2021 30 PAPRI HAZRA 4.18 4.00 95.69 0
1333 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Mahachanda Piped Water Supply Scheme at Bhatar Block , SM/07867 Retrofitting Laying of UPVC pipeline in TAWRA Habitation within Mahachanda PWSS WITHIN Durgapur(Burdwan North ) Sub Division ,PHE Dte, Under Burdwan Division PHE Dte. Assistant Engineer, Durgapur Sub Division, P.H.E. Dte JUNIOR ENGINEER DURGAPUR SUB-DIVISION PHE DTE ORD/000397/2024-2025 622/DSD 05/08/2024 30 MAA MAHAMAYA CONSTRUCTION 4.54 4.54 100 100
1334 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Mahachanda Piped Water Supply Scheme at Bhatar Block , SM/07867 Retrofitting Arrangement of drinking water supply by installation of solar submersible pump including sinking of 200 mm. dia. Tube well 150 Mtr. Deep by direct rotary rig method, Laying dist. System, FHTC for Nunari Village under MAHACHANDA Piped W/S. Scheme, Block Bhatar under Burdwan Division, PHE Dte. Assistant Engineer, Durgapur Sub Division, P.H.E. Dte JUNIOR ENGINEER DURGAPUR SUB-DIVISION PHE DTE ORD/000225/2024-2025 2525/BWD 03/07/2024 120 THE BUSINESS ENGINEERS INDIA 28.00 0.00 0 25
1335 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of RAMKRISHNAPUR Piped Water Supply Scheme at Raina-I Block , SM/07873 Retrofitting Providing Functional Household Tap connection (FHTC) from existing distribution system within the command area of Ramkrishnapur piped water supply scheme at Jamui, Fakirpur, Khemta, Ramkrishnapur & Chandipur village (Mouza), Raina-I Block under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000147/2021-2022 4217/BWD 16/08/2021 45 GHOSH CONCERN 36.49 35.45 97.15 1
1336 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of RAMKRISHNAPUR Piped Water Supply Scheme at Raina-I Block , SM/07873 Retrofitting Providing leftout water tap connection in different villages for 100% coverage to make it Sajal Gram from existing distribution system within scheme jurisdiction of different Piped Water Supply Schemes within Raina ¿ I Block under Burdwan Division, PHE. Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000344/2021-2022 39/BWD 05/01/2022 30 HAFIJUR RAHAMAN MIDYA 15.62 0.00 0 1
1337 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of RAMKRISHNAPUR Piped Water Supply Scheme at Raina-I Block , SM/07873 Retrofitting Extension of pipeline for Ramkrishnapur Water Supply Scheme at Ramkrishnapur and chandipur village within Raina-I Block , under Burdwan Division, PHE Dte. Gr.B. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000375/2021-2022 43/BSD 10/01/2022 30 SUPRIYA RAY 4.79 0.00 0 1
1338 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting at Sonarudra PWSS , SM/06771 Retrofitting Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of SONARUDRA Piped Water Supply Scheme at Purbasthali-I Block under Burdwan Division, PHE Dte.(Agreement No. 51/2020-2021 OF SE/CC/PHE. DTE.) AE(HQs) J.E. 2 BURDWAN ORD/000120/2020-2021 4900/BWD 07/12/2020 90 J.D.J. ENTERPRISE 88.29 44.19 50.05 0
1339 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting at Sonarudra PWSS , SM/06771 Retrofitting Interconnection of tube well no.-1 & Tube well No.-2 along with connection of existing OHR by 100 mm dia DI (K9) pipe and construction of sluice valve chamber of Sonarudra water supply scheme within Kalna Sub-Division, under Burdwan Division, PHE Dte. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000549/2020-2021 8/KSD 05/01/2021 30 BISWAS ENTERPRISE 2.54 4.57 179.92 1
1340 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting at Sonarudra PWSS , SM/06771 Retrofitting Providing FHTC from the existing distribution line and special repair of existing different dia UPVC pipeline including supply of Sluice Valve for proper functioning the existing line of Sonarudra W/S Scheme of Purbasthali-I block within Kalna Sub-Division under Burdwan Division, PHE Dte. (Sl No-A) Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000394/2021-2022 1260/KSD Dt-22.12.2021 22/12/2021 31 BABUL SK 4.14 2.42 58.45 1
1341 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting at Sonarudra PWSS , SM/06771 Retrofitting Providing FHTC from the existing distribution line and special repair of existing different dia UPVC pipeline including supply of Sluice Valve for proper functioning the existing line of Sonarudra W/S Scheme of Purbasthali-I block within Kalna Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000672/2021-2022 29/KSD 07/01/2022 30 BABUL SK 4.14 0.92 22.22 1
1342 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting at Sonarudra PWSS , SM/06771 Retrofitting Supply of 10 mm NB Gun-metal Ferrule conforming to IS: 2692-1989 for Water tap connection in each house hold from existing distribution system within Scheme jurisdiction in different Piped Water Supply Scheme within Kalna Sub-Division under Burdwan Division, PHE. Dte. and delivered at Borsul Divl. Store. [Part-5]. AE(HQs) J.E. 2 BURDWAN ORD/000090/2021-2022 3590/BWD 13/07/2021 30 PREMANANDA ROY BISWAS 127.50 84.65 66.39 1
1343 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting at Sonarudra PWSS , SM/06771 Retrofitting Construction of pathway & plinth protection of Pump House and Surface Drain at the Head Work Site of Sonarudra water supply scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. (Sl No-A) ORD/000356/2021-2022 1218/KSD Dt-10.12.2021 10/12/2021 31 BABUL SK 1.77 1.72 97.18 1
1344 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting at Sonarudra PWSS , SM/06771 Retrofitting Continuation work order for supply of 10 mm NB Gun-Metal /Brass Ferrul conforming to IS:2692-1989 for water tap connection in each household from existing distribution system within scheme jurisdiction in different piped water supply scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. and delivered at Barsul Divisional Store.[Part-6] Assistant Engineer ORD/000867/2020-2021 4318/BWD 04/11/2020 10 MD HASIN 4.93 1.02 20.69 1
1345 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting at Sonarudra PWSS , SM/06771 Retrofitting Formal Work Order for Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of Kashira Piped Water Supply Scheme at Chanak (Part), Gopalbera, Krishnapur, Gatistha & Kashira (Part) Village (Mouza), Mongolkot Block under Burdwan Division, PHE Dte. (Agreement No. 99/SE/CC/PHE/Dte of 2020-2021) AE(HQs) J.E. 2 BURDWAN ORD/000418/2020-2021 915/BWD 02/02/2021 60 MAJUMDER ENTERPRISE 53.52 14.36 26.83 0
1346 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting at Sonarudra PWSS , SM/06771 Retrofitting Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Paranpur village and Paranpur habitation of Jahannagar piped water supply scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. [Phase-I](Tr No.-814/BWD/2020-21) Assistant Engineer ORD/000548/2020-2021 4110/BWD 16/10/2020 30 J. K. CORPORATION 4.86 5.49 112.96 0
1347 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED PALITA PWSS TO ACCOMMODATE FHTC IN KETUGRAM-I BLOCK UNDER KATWA SUB-DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/09413 Augmentation Route Survey and preparation of DPR for PALITA PWSS under Ketugram-I Block under Katwa Sub-Division under Burdwan Division PHE Dte.[Sl No-04] Assistant Engineer ORD/000540/2021-2022 55/KTS 25/01/2022 21 RADIANT 2.78 2.78 100 1
1348 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED PALITA PWSS TO ACCOMMODATE FHTC IN KETUGRAM-I BLOCK UNDER KATWA SUB-DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/09413 Augmentation Supply of materials for different water supply scheme under Burdwan Division, PHE Dte. VCH/001578/2021-2022 1207/DW 10/03/2022 0 EXECUTIVE ENGINEER, RESOURCES DIVISION, P.H.E. DTE. 3,005.00 0.00 0 0
1349 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED PALITA PWSS TO ACCOMMODATE FHTC IN KETUGRAM-I BLOCK UNDER KATWA SUB-DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/09413 Augmentation Supply and delivery of different dia. CIDF sluice valve for Augmentation of PALITA Piped Water Supply Scheme under Burdwan Division, P.H.E. Dte._Sl. No. 09 Assistant Engineer ORD/000620/2021-2022 143/AE/HQ 16/03/2022 10 MAKALI ENGINEERING CORPORATION 4.52 0.00 0 0
1350 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED PALITA PWSS TO ACCOMMODATE FHTC IN KETUGRAM-I BLOCK UNDER KATWA SUB-DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/09413 Augmentation Supply of 1 (one) No. Inspection Vehicle for different JJM Related Works as and when required including supply of driver and fuels (Minimum 8 Hours of duty) under Katwa Sub-Division within Burdwan Division, P.H.E. Dte. Consider 96.00 Km run per Day.(Sl No-1) ORD/000510/2023-2024 499/KTS 22/05/2023 70 M/S MUNMUN DEY 0.90 0.30 33.33 100
1351 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED PALITA PWSS TO ACCOMMODATE FHTC IN KETUGRAM-I BLOCK UNDER KATWA SUB-DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/09413 Augmentation Material Requisition To Resource Division RTOR000044/2021-2022 543/BWD 27/01/2022 0 Resource Division 15.49 0.00 0 0
1352 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED PALITA PWSS TO ACCOMMODATE FHTC IN KETUGRAM-I BLOCK UNDER KATWA SUB-DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/09413 Augmentation Material Requisition To Resource Division RTOR000207/2021-2022 1530/BWD 15/03/2022 0 Resource Division 0.37 0.00 0 0
1353 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED PALITA PWSS TO ACCOMMODATE FHTC IN KETUGRAM-I BLOCK UNDER KATWA SUB-DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/09413 Augmentation Material Requisition To Resource Division RTOR000107/2021-2022 929/BWD 16/02/2022 0 Resource Division 26.89 0.00 0 0
1354 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED PALITA PWSS TO ACCOMMODATE FHTC IN KETUGRAM-I BLOCK UNDER KATWA SUB-DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/09413 Augmentation Augmentation of PALITA Piped Water Supply Scheme with LDS, FHTC, Rising main, Construction of 350 cum capacity OHR with 20.0 mtr. Staging height inclusive of soil investigation, Construction of boundarywall at HW and 2nd TW site with repairing of Pump house -I & II under Ketugram-I Block, District:- Purba-Burdwan. Assistant Engineer JUNIOR ENGINEER R.W.S. BURDWAN SUB-DIVISION PHE DTE ORD/000029/2022-2023 2139/BWD 25/04/2022 1347 M/S GUPTA ENTERPRISE 472.81 448.02 94.76 98
1355 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED PALITA PWSS TO ACCOMMODATE FHTC IN KETUGRAM-I BLOCK UNDER KATWA SUB-DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/09413 Augmentation Continuation order for Supply of 1 (one) No. Inspection Vehicle for different JJM Related Works as and when required including supply of driver and fuels (Minimum 8 Hours of duty) under Katwa Sub-Division within Burdwan Division, P.H.E. Dte. Consider 96.00 Km run per Day. (Sl No-1) Assistant Engineer JUNIOR ENGINEER KATWA SUB-DIVISION PHE DTE ORD/000930/2023-2024 1016/KTS 20/09/2023 23 M/S MUNMUN DEY 0.30 0.09 30 0
1356 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap connection (FHTC) by retrofitting within the command area of KULINGRAM Piped Water Supply Scheme at JAMALPUR Block under Burdwan Division, P.H.E. DTE. , SM/08711 Retrofitting Providing Functional Household Tap Connection (FHTC) for the balance household in (Kolsara, Kulingram Uttar, Kulingram Dakshin, Ranapara Uttar, Ranapara Dakshin, Dutta Para, Kantagoria, Gokul, Gopalpur, Reora & Chack) Part Habitations from existing distribution system within the command area of KULINGRAM Piped Water Supply Scheme at Jamalpur Block under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000126/2021-2022 4536/BWD 06/09/2021 30 SK ALIM 31.20 30.00 96.15 1
1357 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap connection (FHTC) by retrofitting within the command area of KULINGRAM Piped Water Supply Scheme at JAMALPUR Block under Burdwan Division, P.H.E. DTE. , SM/08711 Retrofitting Extension of pipeline for KULINGRAM Water Supply Scheme FOR FHTC work within Jamalpur Block , under Burdwan Division, PHE Dte. Gr.B Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000440/2021-2022 198/BSD 01/02/2022 30 SK ALIM 4.34 3.37 77.65 1
1358 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap connection (FHTC) by retrofitting within the command area of KULINGRAM Piped Water Supply Scheme at JAMALPUR Block under Burdwan Division, P.H.E. DTE. , SM/08711 Retrofitting HDPE pipeline of 75 mm dia of Kulingram water supply scheme for FHTC (Gopalpur, Ranapara, Koisara, Gokul Katagoria)of Jamalpur Block under Burdwan Division, PHE Dte.[Gr.-A] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000703/2021-2022 1424/BSD 25/10/2021 30 SK ALIM 4.52 4.48 99.12 1
1359 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap connection (FHTC) by retrofitting within the command area of KULINGRAM Piped Water Supply Scheme at JAMALPUR Block under Burdwan Division, P.H.E. DTE. , SM/08711 Retrofitting Relaying of damage of pipeline due to irrigation cannel and 75 mm dia HDPE pipeline with FHTC for KULINGRAM Water Supply Scheme within Jamalpur Block,under Burdwan Division, PHE Dte. Group : A Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000088/2022-2023 828/BSD 23/05/2022 30 BISWAKARMA CONSTRUCTION 4.96 4.66 93.95 1
1360 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap connection (FHTC) by retrofitting within the command area of KULINGRAM Piped Water Supply Scheme at JAMALPUR Block under Burdwan Division, P.H.E. DTE. , SM/08711 Retrofitting Sinking of additional 250 X 200mm dia Tube Well 150 mtr. Depth by D.R. Rig method using UPVC pipe (CD) and UPVC Deep Well Screen (RDS) for KULINGRAM Piped Water Supply Scheme, Block - Jamalpur, Dist - Purba Bardhaman under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000073/2022-2023 2473/BWD 12/05/2022 30 NADIA TUBEWELLS 10.32 0.00 0 1
1361 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap connection (FHTC) by retrofitting within the command area of KULINGRAM Piped Water Supply Scheme at JAMALPUR Block under Burdwan Division, P.H.E. DTE. , SM/08711 Retrofitting Extension of pipeline for Kulingram Water Supply Scheme (Rewra village, Gokul Village, Kulingram uttar Village, Chak Village, Ranapara Village, Kantagaria Village, Mirjapur Village, Duttapara Village, Kolsara Village, Gopalpur Village) within Jamalpur Block including water tap connection (FHTC) under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. Junior Engineer, R.W.S. Burdwan Sub Division, P.H.E. Dt ORD/000007/2021-2022 3116/BWD 02/06/2021 60 SK ALIM 151.26 291.46 192.69 0
1362 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap connection (FHTC) by retrofitting within the command area of KULINGRAM Piped Water Supply Scheme at JAMALPUR Block under Burdwan Division, P.H.E. DTE. , SM/08711 Retrofitting Laying of Interconnection of 4th Tube well site and Laying of 90 mm dia HDPE pipeline for KULINGRAM Piped Water Supply Scheme to provide house connection within Burdwan Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. RWS_JAMALPUR ORD/000622/2023-2024 3917/BWD 05/09/2023 30 BARABELUN NO.-II G.P. UNEMPLOYED CO-OP LABOUR CONTRACT & CONSTRUCTION SOCIETY LTD. 8.28 6.08 73.43 100
1363 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap connection (FHTC) by retrofitting within the command area of KULINGRAM Piped Water Supply Scheme at JAMALPUR Block under Burdwan Division, P.H.E. DTE. , SM/08711 Retrofitting Designing, Making and Erection of Sign Board for SAJAL GRAM in Gopalpur Village, Jamalpur Block within Kulingram PWSS under Burdwan Division, PHE Dte. (5 Nos Board) AE(HQs) J.E. 1 BURDWAN ORD/000796/2023-2024 875/AE/HQ 07/11/2023 30 PAPRI HAZRA 0.76 0.72 94.74 100
1364 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap connection (FHTC) by retrofitting within the command area of KULINGRAM Piped Water Supply Scheme at JAMALPUR Block under Burdwan Division, P.H.E. DTE. , SM/08711 Retrofitting Designing, Making and Erection of Sign Board for SAJAL GRAM in Gangarambati Village, Jamalpur Block within Kulingram PWSS under Burdwan Division, PHE Dte. (5 Nos Board) AE(HQs) J.E. 1 BURDWAN ORD/000797/2023-2024 876/AE/HQ 07/11/2023 30 PAPRI HAZRA 0.76 0.72 94.74 100
1365 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap connection (FHTC) by retrofitting within the command area of KULINGRAM Piped Water Supply Scheme at JAMALPUR Block under Burdwan Division, P.H.E. DTE. , SM/08711 Retrofitting Construction of Boundary wall, Land Development for various PWSS, Block- Jamalpur, District:- Purba-Bardhaman within Burdwan Sub Division under Burdwan Division PHE Dte. AE(HQs),AE(HQs), Burdwan Division, PHE Dte. Junior Engineer, Burdwan Division ORD/001100/2024-2025 433/BWD 20/01/2025 120 RABINDRA NATH GORANG 132.64 0.00 0 40
1366 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap connection (FHTC) by retrofitting within the command area of Natungram Piped Water Supply Scheme at Ketugram-II Block under Burdwan Division, P.H.E. DTE. , SM/08713 Retrofitting Connection of CWR & IEP with the existing distribution system under Natungram Piped Water Supply Scheme under Katwa Sub-Division under Burdwan Division, P.H.E. Dte. [Sl No-01] Assistant Engineer Junior Engineer, R.W.S., Katwa-I Dev. Block ORD/000596/2021-2022 160/KTS 24/02/2022 30 JAHAR GHOSH 1.50 1.36 90.67 1
1367 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap connection (FHTC) by retrofitting within the command area of Natungram Piped Water Supply Scheme at Ketugram-II Block under Burdwan Division, P.H.E. DTE. , SM/08713 Retrofitting Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of Natungram Piped Water Supply Scheme at Natungram (Part) & Charnarayanpur Village (Mouza), Ketugram-II Block under Burdwan Division, PHE Dte. (Agreement no. 567/BWD of 2020-2021) AE(HQs) J.E. 2 BURDWAN ORD/000294/2020-2021 357/BWD 15/01/2021 30 JAHAR GHOSH 22.73 6.83 30.05 1
1368 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap connection (FHTC) by retrofitting within the command area of Natungram Piped Water Supply Scheme at Ketugram-II Block under Burdwan Division, P.H.E. DTE. , SM/08713 Retrofitting Construction of sanitary system and drinking water supply arrangement for Head Work Site of Natungram Water Supply Scheme under Katwa Sub-Division within Burdwan Division P.H.E Dte. (Sl No-3) Assistant Engineer Junior Engineer, R.W.S., Katwa-I Dev. Block ORD/000275/2021-2022 800/KTS 10/12/2021 45 JAHAR GHOSH 1.00 0.23 23 1
1369 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap connection (FHTC) by retrofitting within the command area of Natungram Piped Water Supply Scheme at Ketugram-II Block under Burdwan Division, P.H.E. DTE. , SM/08713 Retrofitting Construction of Boundary wall including land development, Pathway and plantation at Head works site of Natungram water supply scheme, Block-Ketugram-II under Katwa Sub-Division under Burdwan Division, PHE Dte. [Tr No.-347/BWD/20-21] Assistant Engineer Junior Engineer, R.W.S., Katwa-I Dev. Block ORD/000482/2020-2021 4282/BWD 03/11/2020 60 MOJAI SK 31.33 8.94 28.53 1
1370 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap connection (FHTC) by retrofitting within the command area of Natungram Piped Water Supply Scheme at Ketugram-II Block under Burdwan Division, P.H.E. DTE. , SM/08713 Retrofitting Regarding release of fund for restoration of road under PMGSY scheme under Ketugram-II Block Katwa Sub-Division PHE Dte. Khatundi to Chitahati (Package No-WB-22-47) BILL/00772/2024-2025 896/JJM 26/09/2024 0 EXECUTIVE ENGINEER (WBSRDA) PURBA BARDHAMAN DIVISION 2.45 0.00 0 0
1371 PURBA BARDHAMAN Burdwan Division Providing Functional House hold Tap Connection (FHTC) by retrofitting at Srikhanda mouza within the command area of Srikhanda piped Water Supply Scheme at Katwa-I Block under Burdwan Division, P.H.E. DTE. (Pt.-B) , SM/08716 Retrofitting Supplying, laying and commissioning of Rising main at pump no. - 2 of Srikhanda PWSS under Katwa Sub-Division under Burdwan Division, PHE Dte. [Sl No-07] Assistant Engineer JUNIOR ENGINEER KATWA SUB-DIVISION PHE DTE ORD/000161/2022-2023 444/KTS 27/06/2022 30 ASHOK KUMAR GHOSH 1.84 1.84 100 1
1372 PURBA BARDHAMAN Burdwan Division Providing Functional House hold Tap Connection (FHTC) by retrofitting at Srikhanda mouza within the command area of Srikhanda piped Water Supply Scheme at Katwa-I Block under Burdwan Division, P.H.E. DTE. (Pt.-B) , SM/08716 Retrofitting Sinking of 300 X 200mm dia Tube Well 200 mtr. Depth by D.R. Rig method using UPVC pipe (CM) and UPVC Medium Well Screen (RMS) for Augmentation of SRIKHANDA and its adjoining mouzas Piped Water Supply Scheme, Block Katwa I, Dist - Purba Bardhaman under Burdwan Division, PHE Dte. Assistant Engineer JUNIOR ENGINEER KATWA SUB-DIVISION PHE DTE ORD/000669/2022-2023 388/BWD 31/01/2023 30 SUBODH KUMAR MONDAL 11.81 8.54 72.31 100
1373 PURBA BARDHAMAN Burdwan Division Providing Functional House hold Tap Connection (FHTC) by retrofitting at Srikhanda mouza within the command area of Srikhanda piped Water Supply Scheme at Katwa-I Block under Burdwan Division, P.H.E. DTE. (Pt.-B) , SM/08716 Retrofitting Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of SRIKHANDA Piped Water Supply Scheme at Katwa - I Block under Burdwan Division, PHE Dte.(Agreement No. 53/2020-2021 OF SE/CC/PHE. DTE.) Assistant Engineer ORD/000121/2020-2021 4880/BWD 07/12/2020 90 ASHOK KUMAR GHOSH 96.84 58.50 60.41 1
1374 PURBA BARDHAMAN Burdwan Division Augmentation of ground water based SHYAMSUNDAR PWSS to accommodate FHTC in RAINA-I block under Burdwan Sub Division of Burdwan Division in Purba Bardhaman District , SM/09495 Augmentation Route Survey & Preparation of DPR for Shyamsundar W/S Scheme under Raina-I Block under Burdwan Sub-Division under Burdwan Division PHE Dte. Sl No.7. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000495/2021-2022 182/BSD 31/01/2022 30 RADIANT 2.90 2.89 99.66 1
1375 PURBA BARDHAMAN Burdwan Division Augmentation of ground water based SHYAMSUNDAR PWSS to accommodate FHTC in RAINA-I block under Burdwan Sub Division of Burdwan Division in Purba Bardhaman District , SM/09495 Augmentation Supply of 100 mm dia C.I. Sluice valve(P.N.-I) of Augmentation of Shyamsundar Water Supply Scheme of Raina-I under Burdwan Sub Division, PHE Dte. Gr.F. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000479/2022-2023 1603/BSD 14/09/2022 15 SK ALIM 1.73 1.73 100 1
1376 PURBA BARDHAMAN Burdwan Division Augmentation of ground water based SHYAMSUNDAR PWSS to accommodate FHTC in RAINA-I block under Burdwan Sub Division of Burdwan Division in Purba Bardhaman District , SM/09495 Augmentation Extension of Pipeline for Shyamsundar village Uttar para of Augmentation of Shyamsundar Piped Water Supply Scheme to provide house connection within Burdwan Sub-Division under Burdwan Division, PHE Dte. Gr.G. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000480/2022-2023 1604/BSD 14/09/2022 30 M/S PROCHESTA ENTERPRISE 4.78 4.77 99.79 1
1377 PURBA BARDHAMAN Burdwan Division Augmentation of ground water based SHYAMSUNDAR PWSS to accommodate FHTC in RAINA-I block under Burdwan Sub Division of Burdwan Division in Purba Bardhaman District , SM/09495 Augmentation Extension of Pipeline for Shyamsundar village Dakshin para of Augmentation of Shyamsundar Piped Water Supply Scheme to provide house connection within Burdwan Sub-Division under Burdwan Division, PHE Dte. Gr.I. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000482/2022-2023 1606/BSD 14/09/2022 30 SK ABDUL HALIM 4.77 4.77 100 1
1378 PURBA BARDHAMAN Burdwan Division Augmentation of ground water based SHYAMSUNDAR PWSS to accommodate FHTC in RAINA-I block under Burdwan Sub Division of Burdwan Division in Purba Bardhaman District , SM/09495 Augmentation Concrete cutting of khalina, shibrampur, shyamsundar uttar para,shyamsundar dakshin para ,natungram village for Augmentation of Shyamsundar Piped Water Supply Scheme to provide house connection within Burdwan Sub-Division under Burdwan Division, PHE Dte. Gr.D. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000367/2022-2023 1406/BSD 10/08/2022 30 SK ALIM 4.68 4.68 100 1
1379 PURBA BARDHAMAN Burdwan Division Augmentation of ground water based SHYAMSUNDAR PWSS to accommodate FHTC in RAINA-I block under Burdwan Sub Division of Burdwan Division in Purba Bardhaman District , SM/09495 Augmentation Extension of Pipeline for Natungram and Shyamsundar village of Augmentation of Shyamsundar Piped Water Supply Scheme to provide house connection within Burdwan Sub-Division under Burdwan Division, PHE Dte. Gr.C Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000441/2022-2023 1479/BSD 25/08/2022 45 SK ABDUL HALIM 4.84 4.83 99.79 1
1380 PURBA BARDHAMAN Burdwan Division Augmentation of ground water based SHYAMSUNDAR PWSS to accommodate FHTC in RAINA-I block under Burdwan Sub Division of Burdwan Division in Purba Bardhaman District , SM/09495 Augmentation Supply of materials for different water supply scheme under Burdwan Division, PHE Dte. VCH/001578/2021-2022 1207/DW 10/03/2022 0 EXECUTIVE ENGINEER, RESOURCES DIVISION, P.H.E. DTE. 3,005.00 0.00 0 0
1381 PURBA BARDHAMAN Burdwan Division Augmentation of ground water based SHYAMSUNDAR PWSS to accommodate FHTC in RAINA-I block under Burdwan Sub Division of Burdwan Division in Purba Bardhaman District , SM/09495 Augmentation Conversion of ACSR Cond to AB CABL of 11KV Shyamsundar Feeder Emanating from Raina S/STN at Shyamsundar PWSS under Burdwan Division, PHE Dte. [Ref ID-860250397, Application ID-100000060727, dt.-16/09/2022] VCH/000551/2022-2023 653/DW/22-23 28/09/2022 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LTD. 1.08 0.00 0 0
1382 PURBA BARDHAMAN Burdwan Division Augmentation of ground water based SHYAMSUNDAR PWSS to accommodate FHTC in RAINA-I block under Burdwan Sub Division of Burdwan Division in Purba Bardhaman District , SM/09495 Augmentation Supply and delivery of different dia. CIDF sluice valve for Augmentation of Paharhati, Nababhat, Shyamsundar & Dewandighi-Mirzapur Piped Water Supply Scheme within Burdwan Sub-Division under Burdwan Division, P.H.E. Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000519/2022-2023 4703/BWD 19/10/2022 20 SSPR VALVE MANUFACTURING PVT LTD. 14.45 3.61 24.98 1
1383 PURBA BARDHAMAN Burdwan Division Augmentation of ground water based SHYAMSUNDAR PWSS to accommodate FHTC in RAINA-I block under Burdwan Sub Division of Burdwan Division in Purba Bardhaman District , SM/09495 Augmentation Sand filling at PWD road side near bazar to thana more(Drawing NOD 15 to 16,16 to 17,6 to 89,11 to 12,12 to 13,12 to 156,10 to 11,13 to 14,14 to 15,1 to 2 to 267,2 to 3 ,7 to 8,7 to 82,4 to 5 ,5 to 6,6 to 82,3 to 4. at Shyamsundar Water supply scheme of Raina Block within Burdwan Division, PHE Dte. Gr.A. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000501/2022-2023 1224/BSD 08/07/2022 7 SK ALIM 4.16 4.09 98.32 1
1384 PURBA BARDHAMAN Burdwan Division Augmentation of ground water based SHYAMSUNDAR PWSS to accommodate FHTC in RAINA-I block under Burdwan Sub Division of Burdwan Division in Purba Bardhaman District , SM/09495 Augmentation Sinking of 300 X 200mm dia Tube Well 150 mtr. Depth by D.R. Rig method using UPVC pipe (CM) and UPVC Deep Well Screen (RMS) for Augmentation of SHYAMSUNDAR & its adjoining mouzas Piped Water Supply Scheme [Shyamsundar Mouza], Block ¿ Raina ¿ I, Dist - Purba Bardhaman under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000509/2022-2023 4446/BWD 27/09/2022 30 SK ALIM 9.87 8.55 86.63 1
1385 PURBA BARDHAMAN Burdwan Division Augmentation of ground water based SHYAMSUNDAR PWSS to accommodate FHTC in RAINA-I block under Burdwan Sub Division of Burdwan Division in Purba Bardhaman District , SM/09495 Augmentation Material Requisition To Resource Division RTOR000053/2021-2022 532/BWD 27/01/2022 0 Resource Division 15.09 0.00 0 0
1386 PURBA BARDHAMAN Burdwan Division Augmentation of ground water based SHYAMSUNDAR PWSS to accommodate FHTC in RAINA-I block under Burdwan Sub Division of Burdwan Division in Purba Bardhaman District , SM/09495 Augmentation Material Requisition To Resource Division RTOR000089/2021-2022 901/BWD 15/02/2022 0 Resource Division 23.47 0.00 0 0
1387 PURBA BARDHAMAN Burdwan Division Augmentation of ground water based SHYAMSUNDAR PWSS to accommodate FHTC in RAINA-I block under Burdwan Sub Division of Burdwan Division in Purba Bardhaman District , SM/09495 Augmentation Material Requisition To Resource Division RTOR000216/2021-2022 1539/BWD 15/03/2022 0 Resource Division 0.37 0.00 0 0
1388 PURBA BARDHAMAN Burdwan Division Augmentation of ground water based SHYAMSUNDAR PWSS to accommodate FHTC in RAINA-I block under Burdwan Sub Division of Burdwan Division in Purba Bardhaman District , SM/09495 Augmentation Augmentation of SHYAMSUNDAR Piped Water Supply Scheme with LDS, Rising Main, Construction of 350 Cum capacity OHR with 20.0 Mtr. Staging height inclusive of soil test, Construction of boundary wall at Head works & 2nd TW site & FHTC under Raina ¿ I Block, District - Purba Bardhaman. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000598/2021-2022 1474/BWD 14/03/2022 365 SK ALIM 474.78 412.65 86.91 100
1389 PURBA BARDHAMAN Burdwan Division Augmentation of Kaigram PWSS for providing Functional House Hold Tap Connection (FHTC) , SM/09717 Augmentation Preparation of DPR for augmentation of Kaigram W/S Scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. (Sl No- E) Assistant Engineer ORD/000517/2021-2022 185/KSD 21/02/2022 21 LEMNISCATE 2.66 2.66 100 1
1390 PURBA BARDHAMAN Burdwan Division Augmentation of Kaigram PWSS for providing Functional House Hold Tap Connection (FHTC) , SM/09717 Augmentation Supply of materials for different water supply scheme under Burdwan Division, PHE Dte. VCH/001578/2021-2022 1207/DW 10/03/2022 0 EXECUTIVE ENGINEER, RESOURCES DIVISION, P.H.E. DTE. 3,005.00 0.00 0 0
1391 PURBA BARDHAMAN Burdwan Division Augmentation of Kaigram PWSS for providing Functional House Hold Tap Connection (FHTC) , SM/09717 Augmentation Material Requisition To Resource Division RTOR000079/2021-2022 605/BWD 28/01/2022 0 Resource Division 24.12 0.00 0 0
1392 PURBA BARDHAMAN Burdwan Division Augmentation of Kaigram PWSS for providing Functional House Hold Tap Connection (FHTC) , SM/09717 Augmentation Material Requisition To Resource Division RTOR000032/2021-2022 533/BWD 27/01/2022 0 Resource Division 16.17 0.00 0 0
1393 PURBA BARDHAMAN Burdwan Division Augmentation of Kaigram PWSS for providing Functional House Hold Tap Connection (FHTC) , SM/09717 Augmentation Material Requisition To Resource Division RTOR000106/2021-2022 905/BWD 15/02/2022 0 Resource Division 12.41 0.00 0 0
1394 PURBA BARDHAMAN Burdwan Division Augmentation of Kaigram PWSS for providing Functional House Hold Tap Connection (FHTC) , SM/09717 Augmentation Material Requisition To Resource Division RTOR000239/2021-2022 1563/BWD 15/03/2022 0 Resource Division 0.37 0.00 0 0
1395 PURBA BARDHAMAN Burdwan Division Augmentation of Kaigram PWSS for providing Functional House Hold Tap Connection (FHTC) , SM/09717 Augmentation Augmentation of KAIGRAM Piped Water Supply Scheme with LDS, FHTC, Rising Main, Construction 250 Cum capacity OHR with 20.0 Mtr. Staging height inclusive of soil test & Construction of Boundary wall under Kalna Sub-Division, Block - Monteswar, Dist. - Purba Bardhaman under Burdwan Division, PHE. Dte. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000436/2021-2022 697/BWD 02/02/2022 365 B.B.C. ENTERPRISE 291.40 234.30 80.4 80
1396 PURBA BARDHAMAN Burdwan Division Augmentation of Kaigram PWSS for providing Functional House Hold Tap Connection (FHTC) , SM/09717 Augmentation Sinking of 250 X 150mm dia Tube Well 150 mtr. Depth by D.R. Rig method using UPVC pipe (CD) and UPVC Deep Well Screen (RDS) at 1st & 2nd Tubewell site for KAIGRAM Piped Water Supply Scheme, Block - Monteswar, Dist - Purba Bardhaman under Burdwan Division, PHE Dte. [2 Nos. GTW]. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000011/2022-2023 1959/BWD 12/04/2022 45 ACME CONSTRUCTION 14.81 13.92 93.99 100
1397 PURBA BARDHAMAN Central Mechanical Augmentation of Kaigram PWSS for providing Functional House Hold Tap Connection (FHTC) , SM/09717 Augmentation Supply & Installation of Submersible Pumping Machinery , Voltage Stabilizer, Chlorination system and internal House wiring for Tube well no.- 1 & 2 at Augumentation of Kaigram Water Supply Scheme under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000067/2023-2024 2564/CMD 06/06/2023 30 CHOUDHURY ENTERPRISE 20.45 19.89 97.26 98
1398 PURBA BARDHAMAN Burdwan Division Augmentation of Kaigram PWSS for providing Functional House Hold Tap Connection (FHTC) , SM/09717 Augmentation Work Order for "Constrcution of 1.5 mtrs. Height Boundary Wall along with 750 mm Height 3 layer barbed wire around Other than head work site for Augmentation of Kaigram Piped Water Supply Scheme (SM/09717) within Kalna Sub-Division under Burdwan Division, PHE Dte." Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/001186/2023-2024 2190/KSD 15/03/2024 10 PARTHA PRATIM ACHARYA 4.56 4.56 100 100
1399 PURBA BARDHAMAN Burdwan Division Augmentation of Kaigram PWSS for providing Functional House Hold Tap Connection (FHTC) , SM/09717 Augmentation Work Order for " Renovation of Pump House for Augmentation of Kaigram Piped Water Supply Scheme (SM/09717) under Kalna Sub-Division under Burdwan Division, PHE Dte. (1 no Pump House Repairing)" Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/001193/2023-2024 2203/KSD 18/03/2024 10 PARTHA PRATIM ACHARYA 1.28 1.27 99.22 100
1400 PURBA BARDHAMAN Central Mechanical Augmentation of Kaigram PWSS for providing Functional House Hold Tap Connection (FHTC) , SM/09717 Augmentation Quotation for new service connection (Load enhancement) at Kaigram PWSS PH-2. BILL/00461/2024-2025 30/07/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 2.48 0.00 0 0
1401 PURBA BARDHAMAN Burdwan Division Augmentation of Kaigram PWSS for providing Functional House Hold Tap Connection (FHTC) , SM/09717 Augmentation Quotation from WBSEDCL for load enhancement of Kaigram water supply scheme for P.H.-1 & 2 under Burdwan Division, PHE Dte. BILL/00549/2024-2025 732/JJM 27/08/2024 0 WBSEDCL 5.01 0.00 0 0
1402 PURBA BARDHAMAN Central Mechanical Augmentation of Kaigram PWSS for providing Functional House Hold Tap Connection (FHTC) , SM/09717 Augmentation Quotation for new service connection (Load enhancement) at Kaigram PWSS PH-1. BILL/00462/2024-2025 30/07/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 2.53 0.00 0 0
1403 PURBA BARDHAMAN Burdwan Division Augmentation of Kaigram PWSS for providing Functional House Hold Tap Connection (FHTC) , SM/09717 Augmentation Providing of balance FHTC and other allied works at Kaigram Mouza under the command area of Kaigram Piped Water Supply Scheme (SM/09717) in order to declare Sajalgram under Mamudpur GP-II under Manteshwar Block under Kalna Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000020/2025-2026 1247/BWD 23/04/2025 30 MONDAL & CO. 18.95 0.00 0 80
1404 PURBA BARDHAMAN Burdwan Division Augmentation of Kaigram PWSS for providing Functional House Hold Tap Connection (FHTC) , SM/09717 Augmentation Providing of balance FHTC and other allied works at Rautgram Mouza under the command area of Kaigram Piped Water Supply Scheme (SM/09717) in order to declare Sajalgram under Mamudpur GP-II under Manteshwar Block under Kalna Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000022/2025-2026 1249/BWD 23/04/2025 30 MONDAL & CO. 28.94 0.00 0 50
1405 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED KETUGRAM (ZONE I & II) PWSS TO ACCOMMODATE FHTC IN KETUGRAM I & II BLOCK UNDER KATWA SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/10085 Augmentation Route Survey and Preparation of DPR for KETUGRAM (ZONE-I & II ) PWSS under Ketugram-I & II Block under Katwa Sub-Division under Burdwan Division PHE Dte. [Sl No-06] Assistant Engineer ORD/000547/2021-2022 66/KTS 27/01/2022 21 RADIANT 4.81 4.91 102.08 1
1406 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED KETUGRAM (ZONE I & II) PWSS TO ACCOMMODATE FHTC IN KETUGRAM I & II BLOCK UNDER KATWA SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/10085 Augmentation Supply of materials for different water supply scheme under Burdwan Division, PHE Dte. VCH/001578/2021-2022 1207/DW 10/03/2022 0 EXECUTIVE ENGINEER, RESOURCES DIVISION, P.H.E. DTE. 3,005.00 0.00 0 0
1407 PURBA BARDHAMAN Central Mechanical AUGMENTATION OF GROUND WATER BASED KETUGRAM (ZONE I & II) PWSS TO ACCOMMODATE FHTC IN KETUGRAM I & II BLOCK UNDER KATWA SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/10085 Augmentation Supply & Installation of Submersible Pumping Machinery , Voltage Stabilizer, Chlorination system and internal House wiring for Tube well no.- 1 at Augumentation of Ketugram (Zone - I) Water Supply Scheme under CMD, PHE Dte., Dist.- Purba-Bardhaman. Driller In-Charge Junior Engineer ORD/000062/2023-2024 2569/CMD 06/06/2023 30 M/S, MONDAL ASSOCIATES. 10.98 0.00 0 0
1408 PURBA BARDHAMAN Central Mechanical AUGMENTATION OF GROUND WATER BASED KETUGRAM (ZONE I & II) PWSS TO ACCOMMODATE FHTC IN KETUGRAM I & II BLOCK UNDER KATWA SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/10085 Augmentation Supply , delivery & Installation of Submersible Pumping Machinery , Voltage stabiliser , Chlorinator and Internal House wiring for Tube well No. 3 of Kandra [ Ketugram ] Water Supply Scheme under CMD, PHE Dte., Dist.- Purba-Bardhaman. [ Block - Ketugram-I ] ASSISTANT ENGINEER ORD/000007/2022-2023 1170/CMD 27/06/2022 365 ELECTRICAL & MECHANICAL ENGINEERING CORPORATION 10.38 9.64 92.87 1
1409 PURBA BARDHAMAN Central Mechanical AUGMENTATION OF GROUND WATER BASED KETUGRAM (ZONE I & II) PWSS TO ACCOMMODATE FHTC IN KETUGRAM I & II BLOCK UNDER KATWA SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/10085 Augmentation Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-2 at Augmentation of Ketugram Water Supply Scheme [Zone-I ] under CMD, PHE Dte., Dist.- Purba-Bardhaman ASSISTANT ENGINEER ORD/000624/2022-2023 2098/CMD 08/09/2022 30 STANDARD ELECTRICALS 11.51 10.86 94.35 1
1410 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED KETUGRAM (ZONE I & II) PWSS TO ACCOMMODATE FHTC IN KETUGRAM I & II BLOCK UNDER KATWA SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/10085 Augmentation Supply and delivery of different dia. CIDF sluice valve for Augmentation of Baharan-Birampur, Kaithan, Majhigram-Sigot & Ketugram (Zone-I & II) Piped Water Supply Scheme within Katwa Sub-Division under Burdwan Division, P.H.E. Dte. Assistant Engineer ORD/000518/2022-2023 4702/BWD 19/10/2022 20 SSPR VALVE MANUFACTURING PVT LTD. 14.45 7.22 49.97 1
1411 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED KETUGRAM (ZONE I & II) PWSS TO ACCOMMODATE FHTC IN KETUGRAM I & II BLOCK UNDER KATWA SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/10085 Augmentation Material Requisition To Resource Division RTOR000156/2021-2022 1248/BWD 07/03/2022 0 Resource Division 4.32 0.00 0 0
1412 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED KETUGRAM (ZONE I & II) PWSS TO ACCOMMODATE FHTC IN KETUGRAM I & II BLOCK UNDER KATWA SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/10085 Augmentation Material Requisition To Resource Division RTOR000227/2021-2022 1549/BWD 15/03/2022 0 Resource Division 0.37 0.00 0 0
1413 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED KETUGRAM (ZONE I & II) PWSS TO ACCOMMODATE FHTC IN KETUGRAM I & II BLOCK UNDER KATWA SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/10085 Augmentation Material Requisition To Resource Division RTOR000176/2021-2022 1334/BWD 08/03/2022 0 Resource Division 114.05 0.00 0 0
1414 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED KETUGRAM (ZONE I & II) PWSS TO ACCOMMODATE FHTC IN KETUGRAM I & II BLOCK UNDER KATWA SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/10085 Augmentation Material Requisition To Resource Division RTOR000035/2022-2023 4631/BWD 17/10/2022 0 Resource Division 0.06 0.00 0 0
1415 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED KETUGRAM (ZONE I & II) PWSS TO ACCOMMODATE FHTC IN KETUGRAM I & II BLOCK UNDER KATWA SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/10085 Augmentation Material Requisition To Resource Division RTOR000012/2022-2023 3271/BWD 29/07/2022 0 Resource Division 50.19 0.00 0 0
1416 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED KETUGRAM (ZONE I & II) PWSS TO ACCOMMODATE FHTC IN KETUGRAM I & II BLOCK UNDER KATWA SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/10085 Augmentation Inter connection work with MS pipe from OHR to Distribution system and restoration of village road and drains for Augmentation of KETUGRAM Z-II Piped Water Supply Scheme under Ketugram-II Block, Dist-Purba Bardhaman. Assistant Engineer JE, Katwa Sub-Division ORD/000909/2023-2024 5481/BWD 13/12/2023 120 S & P ENTERPRISE 181.31 77.21 42.58 40
1417 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED KETUGRAM (ZONE I & II) PWSS TO ACCOMMODATE FHTC IN KETUGRAM I & II BLOCK UNDER KATWA SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/10085 Augmentation Sinking of additional 300 X 200mm dia Tube Well 150 mtr. Depth by D.R. Rig method using UPVC pipe (CD) and UPVC Deep Well Screen (RDS) for Augmentation of KETUGRAM (ZONE-I) Piped Water Supply Scheme, Block - Ketugram - II, Dist - Purba Bardhaman under Burdwan Division, PHE Dte. [2 Nos. GTW]. Assistant Engineer JUNIOR ENGINEER KATWA SUB-DIVISION PHE DTE ORD/000067/2022-2023 2420/BWD 11/05/2022 45 AUXILIARY TUBE WELL DRILLERS 23.90 20.87 87.32 100
1418 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED KETUGRAM (ZONE I & II) PWSS TO ACCOMMODATE FHTC IN KETUGRAM I & II BLOCK UNDER KATWA SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/10085 Augmentation Quotation from WBSEDCL for new service connection of Augmentation of ground water based Ketugram Zone-I PWSS. BILL/00516/2024-2025 688/JJM 14/08/2024 0 WBSEDCL 9.28 0.00 0 0
1419 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED KETUGRAM (ZONE I & II) PWSS TO ACCOMMODATE FHTC IN KETUGRAM I & II BLOCK UNDER KATWA SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/10085 Augmentation Sinking of additional 300 X 200mm dia Tube Well 150 mtr. Depth by D.R. Rig method using UPVC pipe (CD) and UPVC Deep Well Screen (RDS) for Augmentation of KETUGRAM (ZONE-II) Piped Water Supply Scheme, Block - Ketugram - II, Dist - Purba Bardhaman under Burdwan Division, PHE Dte. [3 Nos. GTW]. Assistant Engineer JUNIOR ENGINEER KATWA SUB-DIVISION PHE DTE ORD/000068/2022-2023 2421/BWD 11/05/2022 965 AUXILIARY TUBE WELL DRILLERS 35.85 18.19 50.74 80
1420 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED KETUGRAM (ZONE I & II) PWSS TO ACCOMMODATE FHTC IN KETUGRAM I & II BLOCK UNDER KATWA SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/10085 Augmentation Augmentation of KETUGRAM ZONE-I (PART-A & PART-B) Piped Water Supply Scheme with LDS, FHTC, & Construction of 700 cum & 200 Cum capacity OHR with 20.0 mtr. Staging height inclusive of soil investigation respectively under Ketugram-I Block, District:- Purba-Burdwan. Assistant Engineer JUNIOR ENGINEER R.W.S. BURDWAN SUB-DIVISION PHE DTE ORD/000149/2022-2023 3075/BWD 11/07/2022 1135 M/S S.S. ENTERPRISE 930.60 737.00 79.2 70
1421 PURBA BARDHAMAN Central Mechanical AUGMENTATION OF GROUND WATER BASED KETUGRAM (ZONE I & II) PWSS TO ACCOMMODATE FHTC IN KETUGRAM I & II BLOCK UNDER KATWA SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/10085 Augmentation Supply & Installation of Submersible Pumping Machinery , Voltage Stabilizer, Chlorination system and internal House wiring for Tube well no.- 1 & 3 at Augumentation of Ketugram (Zone - II) Water Supply Scheme under CMD, PHE Dte., Dist.- Purba-Bardhaman. Driller In-Charge Junior Engineer ORD/000077/2023-2024 2573/CMD 06/06/2023 30 SOUNAK ENTERPRISE 21.96 0.00 0 40
1422 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED KETUGRAM (ZONE I & II) PWSS TO ACCOMMODATE FHTC IN KETUGRAM I & II BLOCK UNDER KATWA SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/10085 Augmentation Augmentation of KETUGRAM ZONE-II Piped Water Supply Scheme with LDS, FHTC, & Construction of 1250 cum capacity OHR with 20.0 mtr. Staging height inclusive of soil investigation under Ketugram-II Block, District:- Purba-Burdwan. Assistant Engineer JE, Katwa Sub-Division,Junior Engineer2, Durgapur Sub-Division, PHE Dte. ORD/000125/2022-2023 2996/BWD 05/07/2022 880 S & P ENTERPRISE 1,064.91 965.35 90.65 90
1423 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED KETUGRAM (ZONE I & II) PWSS TO ACCOMMODATE FHTC IN KETUGRAM I & II BLOCK UNDER KATWA SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/10085 Augmentation Continuation work order for Supply of 1 (one) No. Diesel driven Ambassador Car (Luxury Taxi) / Motor Cab on hire basis for the Office of the Assistant Engineer, under Katwa Sub-Division within Burdwan Division, P.H.E. Dte. [Period from 01.01.2025 to 30.06.2025]. Assistant Engineer JUNIOR ENGINEER KATWA SUB-DIVISION PHE DTE ORD/001026/2024-2025 1810/KTS 31/12/2024 181 KRISHNA MONDAL 2.40 1.17 48.75 20
1424 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED KETUGRAM (ZONE I & II) PWSS TO ACCOMMODATE FHTC IN KETUGRAM I & II BLOCK UNDER KATWA SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/10085 Augmentation Balance Work For OHR, Extension Of Pipeline To Provide FHTC With Sinking Of Tube Well, Construction Of Pump House, Boundary Wall, Land Development, Plinth Protection For Pump House, Approach Road & Other Related Work Under Bakalsa, Chakdaha, Ehaipur, Khatundi And Ketugram (Zone-I) Part-A & B PWSS Under Katwa Sub Division, Block- Ketugram-I, Burdwan Division PHE Dte. Assistant Engineer JUNIOR ENGINEER R.W.S. BURDWAN SUB-DIVISION PHE DTE ORD/000288/2024-2025 2741/BWD 12/07/2024 415 M/S M.M. ENTERPRISE 205.15 0.00 0 65
1425 PURBA BARDHAMAN Burdwan Division DETAILED PROJECT REPORT FOR AUGMENTATION OF BORSHUL (ZONE-II) PWSS BURDWAN-II PURBA BARDHAMAN , SM/10481 Augmentation Route Survey & Preparation of DPR for Borsul (Zone-I) & (Zone-II) W/S Scheme under Burdwan-II Block under Burdwan Sub-Division under Burdwan Division PHE Dte. Sl No.1. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000510/2021-2022 176/BSD 31/01/2022 30 APEX ENGINEERING 4.18 4.18 100 1
1426 PURBA BARDHAMAN Burdwan Division DETAILED PROJECT REPORT FOR AUGMENTATION OF BORSHUL (ZONE-II) PWSS BURDWAN-II PURBA BARDHAMAN , SM/10481 Augmentation Sinking of 250 X 150mm dia Tube Well 150 mtr. Depth by D.R. Rig method using UPVC pipe (CD) and UPVC Deep Well Screen (RDS) at BELNA Mouza & Head Works Site for BORSHUL (Zone-II) Piped Water Supply Scheme, Block - Burdwan - II, Dist - Purba Bardhaman under Burdwan Division, PHE Dte. [For 02 Nos. Tube well]. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. Junior Engineer, Burdwan Sadar Sub-Division ORD/000206/2023-2024 2709/BWD 08/06/2023 45 M/S D. PALIT & CO. 19.82 17.80 89.81 100
1427 PURBA BARDHAMAN Burdwan Division DETAILED PROJECT REPORT FOR AUGMENTATION OF BORSHUL (ZONE-II) PWSS BURDWAN-II PURBA BARDHAMAN , SM/10481 Augmentation Material Requisition To Resource Division RTOR000045/2022-2023 4852/BWD 20/10/2022 0 Resource Division 12.32 0.00 0 0
1428 PURBA BARDHAMAN Central Mechanical DETAILED PROJECT REPORT FOR AUGMENTATION OF BORSHUL (ZONE-II) PWSS BURDWAN-II PURBA BARDHAMAN , SM/10481 Augmentation New service connection charges for Borshul PWSS Z-II TW-1 BILL/01414/2023-2024 BP-2023-24-140 28/08/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 5.99 0.00 0 0
1429 PURBA BARDHAMAN Burdwan Division DETAILED PROJECT REPORT FOR AUGMENTATION OF BORSHUL (ZONE-II) PWSS BURDWAN-II PURBA BARDHAMAN , SM/10481 Augmentation Improvement works of Borshul Godown & other allied works under Augmentation of BORSHUL (Zone-II) PWSS in Bardhaman-II Block. (SM/10481) within Burdwan Division PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000187/2024-2025 2418/BWD 27/06/2024 90 ANWESHA CONSTRUCTION 20.86 0.00 0 0
1430 PURBA BARDHAMAN Burdwan Division DETAILED PROJECT REPORT FOR AUGMENTATION OF BORSHUL (ZONE-II) PWSS BURDWAN-II PURBA BARDHAMAN , SM/10481 Augmentation Construction of Pump House cum chlorine room without sanitary and water supply arrangement at Tube Well Site to departmental drawing no-PHE/BD/P.H/DRG/02/DEC-17(Size 3.60 mtr x 3.00 mtr room) for BARSUL ZONE-II its Adjoining Mouza W/S Scheme, Block -BURDWAN-II within Burdwan Sub-Division, PHE Dte. (Mouza- Belna) Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. Junior Engineer, Burdwan Sadar Sub-Division ORD/000772/2022-2023 509/BSD 21/03/2023 45 MOHAMMAD ISSA 3.49 2.89 82.81 100
1431 PURBA BARDHAMAN Burdwan Division DETAILED PROJECT REPORT FOR AUGMENTATION OF BORSHUL (ZONE-II) PWSS BURDWAN-II PURBA BARDHAMAN , SM/10481 Augmentation Construction of 3.6mtr.x3.0mtr.Size pump house including plinth protection with surface drain at Head Work TW site for Borshul (Zone-II) Water Supply Scheme, Block: Burdwan-II within Burdwan Division, PHE Dte. Dist.-Purba Bardhaman. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. Junior Engineer, Burdwan Sadar Sub-Division ORD/000589/2023-2024 2042/BSD 24/08/2023 45 RAHAMAN ENTERPRISE 4.84 4.84 100 100
1432 PURBA BARDHAMAN Central Mechanical DETAILED PROJECT REPORT FOR AUGMENTATION OF BORSHUL (ZONE-II) PWSS BURDWAN-II PURBA BARDHAMAN , SM/10481 Augmentation New service connection charges for Borshul PWSS ZONE-II, TW-2 BILL/01827/2023-2024 BP-2023-24-335 06/01/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 7.11 0.00 0 0
1433 PURBA BARDHAMAN Central Mechanical DETAILED PROJECT REPORT FOR AUGMENTATION OF BORSHUL (ZONE-II) PWSS BURDWAN-II PURBA BARDHAMAN , SM/10481 Augmentation Quotation for new service connection at Borsul W/S Scheme Zone-II, PH-III. BILL/00862/2024-2025 BP-2024-25-334 04/10/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.86 0.00 0 0
1434 PURBA BARDHAMAN Burdwan Division DETAILED PROJECT REPORT FOR AUGMENTATION OF BORSHUL (ZONE-II) PWSS BURDWAN-II PURBA BARDHAMAN , SM/10481 Augmentation Conducting physical Household Survey at the IMIS reported village for HGJ certification and providing balance FHTC for Har Ghar Jal certification including conducting Gram Sabhas for different IMIS reported villages across the district under Burdwan Division, PHE Dte. AE(HQs),Assistant Engineer ,Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE.,Assistant Engineer, Durgapur Sub Division, P.H.E. Dte JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000428/2024-2025 3107/BWD 12/08/2024 323 TUBGRAM GRAMMYAK UNNAYAN SAMITY 309.60 0.00 0 85
1435 PURBA BARDHAMAN Burdwan Division DETAILED PROJECT REPORT FOR AUGMENTATION OF BORSHUL (ZONE-II) PWSS BURDWAN-II PURBA BARDHAMAN , SM/10481 Augmentation Construction of internal pathway , approch road and Ohr Plinth protection at head work site for Borshul Z-II PWSS under Bardhaman-II block within Burdwan Div.PHE Dte. Junior Engineer, Burdwan Sadar Sub-Division ORD/000654/2025-2026 1411/BSD 17/06/2025 60 RADHAKRISHNA ENTERPRISE 4.60 0.00 0 100
1436 PURBA BARDHAMAN Burdwan Division DETAILED PROJECT REPORT FOR AUGMENTATION OF BORSHUL (ZONE-II) PWSS BURDWAN-II PURBA BARDHAMAN , SM/10481 Augmentation Designing, making and erection of Sign Board for SWAJAL GRAM in Belna village of Burdwan-II Block under Barsul-II Piped Water Supply Scheme within Burdwan Sub-Division under Burdwan Division,PHE Dte(5 nos. Board) Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. Junior Engineer, Burdwan Sadar Sub-Division ORD/000467/2025-2026 2333/BSD 21/08/2025 10 MANABSEBA PROKALPA & CONSTRUCTIONS 0.72 0.00 0 100
1437 PURBA BARDHAMAN Burdwan Division DETAILED PROJECT REPORT FOR AUGMENTATION OF BORSHUL (ZONE-II) PWSS BURDWAN-II PURBA BARDHAMAN , SM/10481 Augmentation Designing, making and erection of Sign Board for SWAJAL GRAM in Totpara village of Burdwan-II Block under Barsul Z: II Piped Water Supply Scheme within Burdwan Sub-Division under Burdwan Division, PHE Dte (5 nos Board) Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. Junior Engineer, Burdwan Sadar Sub-Division ORD/000611/2025-2026 2354/BSD 21/08/2025 10 MANABSEBA PROKALPA & CONSTRUCTIONS 0.72 0.00 0 100
1438 PURBA BARDHAMAN Burdwan Division DETAILED PROJECT REPORT FOR AUGMENTATION OF BORSHUL (ZONE-II) PWSS BURDWAN-II PURBA BARDHAMAN , SM/10481 Augmentation Designing,making and erection of Sign Board for SWAJAL GRAM in Baje Salepur village of Burdwan-II Block under Barshul (Zone-II) Piped Water Supply Scheme within Burdwan Sub-Division under Burdwan Division,PHE Dte (5 Nos. Board) Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. Junior Engineer, Burdwan Sadar Sub-Division ORD/000448/2025-2026 2311/BSD 19/08/2025 10 MANABSEBA PROKALPA & CONSTRUCTIONS 0.72 0.00 0 100
1439 PURBA BARDHAMAN Burdwan Division DETAILED PROJECT REPORT FOR AUGMENTATION OF BORSHUL (ZONE-II) PWSS BURDWAN-II PURBA BARDHAMAN , SM/10481 Augmentation Augmentation of Borshul (Zone-II) (Mouzas :- Belna, Manikhati, Jafrabad, Kalinagar, Baje Salepur, Totopara) Piped Water Supply Scheme with LDS, FHTC, Rising main, Construction of 250 cum capacity OHR with 20.0 mtr. Staging height inclusive of soil investigation under BARDHAMAN- II Block, District:- Purba-Burdwan. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. Junior Engineer, Burdwan Sadar Sub-Division ORD/000151/2022-2023 3101/BWD 14/07/2022 898 ASHOK KUMAR GHOSH 342.55 311.53 90.94 80
1440 PURBA BARDHAMAN Burdwan Division Details Project Report on Providing Water Tap Connection in each School (1021 Nos) for 100% School Coverage from existing Distribution system within scheme jurisdiction of different Piped Water Supply Schemes within Purba Bardhaman District under Burdwan , SM/10378 School providing leftout water tap connection in each school for 100 % school coverage from existing distribution system within scheme jurisdiction of different piped water supply schemes within Purbasthali-I Block under Burdwan Division, PHE Dte.[Part-A] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000707/2021-2022 6738/BWD 03/12/2021 15 TAPAS KUMAR ROY 3.78 2.21 58.47 0
1441 PURBA BARDHAMAN Burdwan Division Details Project Report on Providing Water Tap Connection in each School (1021 Nos) for 100% School Coverage from existing Distribution system within scheme jurisdiction of different Piped Water Supply Schemes within Purba Bardhaman District under Burdwan , SM/10378 School Providing leftout water tap connection in each school for 100 % school coverage from existing distribution system within scheme jurisdiction of different piped water supply schemes within Kalna-I Block under Burdwan Division, PHE Dte.[SL-13] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000708/2021-2022 6752/BWD 03/12/2021 15 BISWAS ENTERPRISE 4.73 1.85 39.11 0
1442 PURBA BARDHAMAN Burdwan Division Details Project Report on Providing Water Tap Connection in each School (1021 Nos) for 100% School Coverage from existing Distribution system within scheme jurisdiction of different Piped Water Supply Schemes within Purba Bardhaman District under Burdwan , SM/10378 School Providing leftout water tap connection in each school for 100 % school coverage from existing distribution system within scheme jurisdiction of different piped water supply schemes within Purbasthali-II Block under Burdwan Division, PHE Dte.[Part-B][SL-27] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000710/2021-2022 6759/.BWD 03/12/2021 15 PARTHA PRATIM ACHARYA 4.71 2.79 59.24 0
1443 PURBA BARDHAMAN Burdwan Division Details Project Report on Providing Water Tap Connection in each School (1021 Nos) for 100% School Coverage from existing Distribution system within scheme jurisdiction of different Piped Water Supply Schemes within Purba Bardhaman District under Burdwan , SM/10378 School Providing leftout water tap connection in each school for 100 % school coverage from existing distribution system within scheme jurisdiction of different piped water supply schemes within Memari-I Block under Burdwan Division, PHE Dte.[SL-21] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000755/2021-2022 6735/BWD 03/12/2021 15 N.S. ENTERPRISE 3.89 1.31 33.68 0
1444 PURBA BARDHAMAN Burdwan Division Details Project Report on Providing Water Tap Connection in each School (1021 Nos) for 100% School Coverage from existing Distribution system within scheme jurisdiction of different Piped Water Supply Schemes within Purba Bardhaman District under Burdwan , SM/10378 School Providing leftout water tap connection in each school for 100 % school coverage from existing distribution system within scheme jurisdiction of different piped water supply schemes within Memari-I Block under Burdwan Division, PHE Dte.[SL-22] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000761/2021-2022 6736/BWD 03/12/2021 15 A R TRADERS 4.01 1.74 43.39 0
1445 PURBA BARDHAMAN Burdwan Division Details Project Report on Providing Water Tap Connection in each School (1021 Nos) for 100% School Coverage from existing Distribution system within scheme jurisdiction of different Piped Water Supply Schemes within Purba Bardhaman District under Burdwan , SM/10378 School Providing leftout water tap connection in each school for 100 % school coverage from existing distribution system within scheme jurisdiction of different piped water supply schemes within Burdwan-I Block under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000689/2021-2022 6748/BWD 03/12/2021 15 DEBJYOTI GOSWAMI 4.84 1.04 21.49 0
1446 PURBA BARDHAMAN Burdwan Division Details Project Report on Providing Water Tap Connection in each School (1021 Nos) for 100% School Coverage from existing Distribution system within scheme jurisdiction of different Piped Water Supply Schemes within Purba Bardhaman District under Burdwan , SM/10378 School Providing leftout water tap connection in each school for 100 % school coverage from existing distribution system within scheme jurisdiction of different piped water supply schemes within Raina-I Block under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000706/2021-2022 6760/BWD 03/12/2021 15 POMPA CONSTRUCTION CO. 2.97 0.71 23.91 0
1447 PURBA BARDHAMAN Burdwan Division Details Project Report on Providing Water Tap Connection in each School (1021 Nos) for 100% School Coverage from existing Distribution system within scheme jurisdiction of different Piped Water Supply Schemes within Purba Bardhaman District under Burdwan , SM/10378 School Providing leftout water tap connection in each school for 100 % school coverage from existing distribution system within scheme jurisdiction of different piped water supply schemes within Memari-II Block under Burdwan Division, PHE Dte.[SL-23] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000729/2021-2022 6737/BWD 03/12/2021 15 M/S LOKE NIRMAN 1.39 1.04 74.82 0
1448 PURBA BARDHAMAN Burdwan Division Details Project Report on Providing Water Tap Connection in each School (1021 Nos) for 100% School Coverage from existing Distribution system within scheme jurisdiction of different Piped Water Supply Schemes within Purba Bardhaman District under Burdwan , SM/10378 School Providing leftout water tap connection in each school for 100 % school coverage from existing distribution system within scheme jurisdiction of different piped water supply schemes within Kalna-II Block under Burdwan Division, PHE Dte.[sl-14] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000713/2021-2022 6753/BWD 03/12/2021 15 M/S UNIQUE 3.90 3.81 97.69 0
1449 PURBA BARDHAMAN Burdwan Division Details Project Report on Providing Water Tap Connection in each School (1021 Nos) for 100% School Coverage from existing Distribution system within scheme jurisdiction of different Piped Water Supply Schemes within Purba Bardhaman District under Burdwan , SM/10378 School Providing leftout water tap connection in each school for 100 % school coverage from existing distribution system within scheme jurisdiction of different piped water supply schemes within Katwa-I Block under Burdwan Division, PHE Dte.[sl-15] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000721/2021-2022 6754/BWD 03/12/2021 15 CHANCHAL PAL 2.06 1.00 48.54 0
1450 PURBA BARDHAMAN Burdwan Division Details Project Report on Providing Water Tap Connection in each School (1021 Nos) for 100% School Coverage from existing Distribution system within scheme jurisdiction of different Piped Water Supply Schemes within Purba Bardhaman District under Burdwan , SM/10378 School Providing leftout water tap connection in each school for 100 % school coverage from existing distribution system within scheme jurisdiction of different piped water supply schemes within Jamalpur Block under Burdwan Division, PHE Dte.[sl-03] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000722/2021-2022 6742/BWD 03/12/2021 15 ROY CONSTRUCTION 4.78 3.51 73.43 0
1451 PURBA BARDHAMAN Burdwan Division Details Project Report on Providing Water Tap Connection in each School (1021 Nos) for 100% School Coverage from existing Distribution system within scheme jurisdiction of different Piped Water Supply Schemes within Purba Bardhaman District under Burdwan , SM/10378 School Providing leftout water tap connection in each school for 100 % school coverage from existing distribution system within scheme jurisdiction of different piped water supply schemes within Katwa-II Block under Burdwan Division, PHE Dte.[sl-16] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000723/2021-2022 6755/BWD 03/12/2021 15 OM CONSTRUCTION 1.84 1.17 63.59 0
1452 PURBA BARDHAMAN Burdwan Division Details Project Report on Providing Water Tap Connection in each School (1021 Nos) for 100% School Coverage from existing Distribution system within scheme jurisdiction of different Piped Water Supply Schemes within Purba Bardhaman District under Burdwan , SM/10378 School Providing leftout water tap connection in each school for 100 % school coverage from existing distribution system within scheme jurisdiction of different piped water supply schemes within Monteswar Block under Burdwan Division, PHE Dte.[SL-22] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000762/2021-2022 6733/BWD 03/12/2021 15 PRONAB KUMAR DEY 4.01 2.29 57.11 0
1453 PURBA BARDHAMAN Burdwan Division Details Project Report on Providing Water Tap Connection in each School (1021 Nos) for 100% School Coverage from existing Distribution system within scheme jurisdiction of different Piped Water Supply Schemes within Purba Bardhaman District under Burdwan , SM/10378 School Providing leftout water tap connection in each school for 100 % school coverage from existing distribution system within scheme jurisdiction of different piped water supply schemes within Burdwan-II Block under Burdwan Division, PHE Dte. [SL NO.-10] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000753/2021-2022 6749/BWD 03/12/2021 15 GOUTAM KUMAR MITRA 2.42 2.04 84.3 0
1454 PURBA BARDHAMAN Burdwan Division Details Project Report on Providing Water Tap Connection in each School (1021 Nos) for 100% School Coverage from existing Distribution system within scheme jurisdiction of different Piped Water Supply Schemes within Purba Bardhaman District under Burdwan , SM/10378 School Providing leftout water tap connection in each school for 100 % school coverage from existing distribution system within scheme jurisdiction of different piped water supply schemes within Khandaghosh Block under Burdwan Division, PHE Dte.[SL-20] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000756/2021-2022 6734/BWD 03/12/2021 15 SOUMYAVASH DAS 3.33 2.47 74.17 0
1455 PURBA BARDHAMAN Burdwan Division Details Project Report on Providing Water Tap Connection in each School (1021 Nos) for 100% School Coverage from existing Distribution system within scheme jurisdiction of different Piped Water Supply Schemes within Purba Bardhaman District under Burdwan , SM/10378 School Providing leftout water tap connection in each school for 100 % school coverage from existing distribution system within scheme jurisdiction of different piped water supply schemes within Jamalpur Block under Burdwan Division, PHE Dte.[SL-04] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000758/2021-2022 6743/BWD 03/12/2021 15 ROY BISWAS CONSTRUCTION 4.72 2.67 56.57 0
1456 PURBA BARDHAMAN Burdwan Division Details Project Report on Providing Water Tap Connection in each School (1021 Nos) for 100% School Coverage from existing Distribution system within scheme jurisdiction of different Piped Water Supply Schemes within Purba Bardhaman District under Burdwan , SM/10378 School Providing leftout water tap connection in each school for 100 % school coverage from existing distribution system within scheme jurisdiction of different piped water supply schemes within Bhatar Block under Burdwan Division, PHE Dte.[SL-08] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000759/2021-2022 6747/BWD 03/12/2021 15 DEEPAK ENTERPRISE 4.47 0.59 13.2 0
1457 PURBA BARDHAMAN Burdwan Division Details Project Report on Providing Water Tap Connection in each School (1021 Nos) for 100% School Coverage from existing Distribution system within scheme jurisdiction of different Piped Water Supply Schemes within Purba Bardhaman District under Burdwan , SM/10378 School Providing leftout water tap connection in each school for 100 % school coverage from existing distribution system within scheme jurisdiction of different piped water supply schemes within Ausgram-II Block under Burdwan Division, PHE Dte.[SL-06] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000771/2021-2022 6745/BWD 03/12/2021 15 TARAMA AGENCY 2.42 0.42 17.36 0
1458 PURBA BARDHAMAN Burdwan Division Details Project Report on Providing Water Tap Connection in each School (1021 Nos) for 100% School Coverage from existing Distribution system within scheme jurisdiction of different Piped Water Supply Schemes within Purba Bardhaman District under Burdwan , SM/10378 School Providing leftout water tap connection in each school for 100 % school coverage from existing distribution system within scheme jurisdiction of different piped water supply schemes within Galsi-I Block under Burdwan Division, PHE Dte.[SL-11] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000788/2021-2022 6750/BWD 03/12/2021 15 PAPRI HAZRA 4.67 2.33 49.89 0
1459 PURBA BARDHAMAN Burdwan Division Details Project Report on Providing Water Tap Connection in each School (1021 Nos) for 100% School Coverage from existing Distribution system within scheme jurisdiction of different Piped Water Supply Schemes within Purba Bardhaman District under Burdwan , SM/10378 School Providing leftout water tap connection in each school for 100 % school coverage from existing distribution system within scheme jurisdiction of different piped water supply schemes within Jamalpur Block under Burdwan Division, PHE Dte. [Part-A][Sl-01] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000789/2021-2022 6740/BWD 03/12/2021 15 MUKHERJEE ENTERPRISE 4.77 2.85 59.75 0
1460 PURBA BARDHAMAN Burdwan Division Details Project Report on Providing Water Tap Connection in each School (1021 Nos) for 100% School Coverage from existing Distribution system within scheme jurisdiction of different Piped Water Supply Schemes within Purba Bardhaman District under Burdwan , SM/10378 School Providing leftout water tap connection in each school for 100 % school coverage from existing distribution system within scheme jurisdiction of different piped water supply scheme within Jamalpur Block under Burdwan Division, PHE Dte. [Part-B] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000791/2021-2022 674/BWD 03/12/2021 15 KAJAL MUKHERJEE 4.77 1.84 38.57 0
1461 PURBA BARDHAMAN Burdwan Division Details Project Report on Providing Water Tap Connection in each School (1021 Nos) for 100% School Coverage from existing Distribution system within scheme jurisdiction of different Piped Water Supply Schemes within Purba Bardhaman District under Burdwan , SM/10378 School Providing leftout water tap connection in each school for 100 % school coverage from existing distribution system within scheme jurisdiction of different piped water supply schemes within Purbasthali-II Block under Burdwan Division, PHE Dte. [Part-A][SL-26] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000782/2021-2022 6758/BWD 03/12/2021 15 MOYAZZEM CONSTRUCTION 4.67 2.07 44.33 0
1462 PURBA BARDHAMAN Burdwan Division Details Project Report on Providing Water Tap Connection in each School (1021 Nos) for 100% School Coverage from existing Distribution system within scheme jurisdiction of different Piped Water Supply Schemes within Purba Bardhaman District under Burdwan , SM/10378 School Providing leftout water tap connection in each school for 100 % school coverage from existing distribution system within scheme jurisdiction of different piped water supply schemes within Mongalkote Block under Burdwan Division, PHE Dte.[SL-30] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000811/2021-2022 6762/BWD 03/12/2021 15 ASMA ENTERPRISE 3.45 2.71 78.55 0
1463 PURBA BARDHAMAN Burdwan Division Details Project Report on Providing Water Tap Connection in each School (1021 Nos) for 100% School Coverage from existing Distribution system within scheme jurisdiction of different Piped Water Supply Schemes within Purba Bardhaman District under Burdwan , SM/10378 School Providing leftout water tap connection in each school for 100 % school coverage from existing distribution system within scheme jurisdiction of different piped water supply schemes within Purbasthali-I Block under Burdwan Division, PHE Dte.[Part-B][SL-25] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000705/2021-2022 6759/BWD 03/12/2021 15 M/S SAYAN CHAKRABORTY 3.79 2.29 60.42 0
1464 PURBA BARDHAMAN Burdwan Division Details Project Report on Providing Water Tap Connection in each School (1021 Nos) for 100% School Coverage from existing Distribution system within scheme jurisdiction of different Piped Water Supply Schemes within Purba Bardhaman District under Burdwan , SM/10378 School Providing leftout water tap connection in each school for 100 % school coverage from existing distribution system within scheme jurisdiction of different piped water supply schemes within Ketugram-II Block under Burdwan Division, PHE Dte.[SL-18] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000709/2021-2022 6757/BWD 03/12/2021 15 ABDUL HAI 2.97 2.67 89.9 0
1465 PURBA BARDHAMAN Burdwan Division Details Project Report on Providing Water Tap Connection in each School (1021 Nos) for 100% School Coverage from existing Distribution system within scheme jurisdiction of different Piped Water Supply Schemes within Purba Bardhaman District under Burdwan , SM/10378 School Providing leftout water tap connection in each school for 100 % school coverage from existing distribution system within the scheme jurisdiction of different piped water supply schemes within Ketugram-I Block under Burdwan Division, PHE Dte. [SL-17] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000931/2021-2022 6756/BWD 03/12/2021 15 DULU MIDDA 4.71 4.07 86.41 100
1466 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Mondalgram Piped Water Supply Scheme , SM/07822 Retrofitting Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of Mondalgram Piped Water Supply Scheme at Mondalgram (10 Nos Habitation) Village (Mouza), Memari-II Block under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000111/2021-2022 3879/BWD 27/07/2021 60 SUPRIYA RAY 102.04 83.81 82.13 1
1467 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Mondalgram Piped Water Supply Scheme , SM/07822 Retrofitting Extension of UPVC water supply line for Mondalgram and its adjoining mouzas W/S. Scheme within Memari- II Block, under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000614/2021-2022 1576/BWD 16/03/2022 30 PAPRI HAZRA 10.41 8.28 79.54 1
1468 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Mondalgram Piped Water Supply Scheme , SM/07822 Retrofitting Sinking of 300 X 200mm dia Tube Well 150 mtr. Depth by D.R. Rig method using UPVC pipe (CM) and UPVC Medium Well Screen (RMS) of MONDALGRAM & its adjoining mouzas Piped Water Supply Scheme, Block ? Memari ? II, Dist - Purba Bardhaman under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000554/2022-2023 5196/BWD 24/11/2022 30 ANIRUDDHA FARUQUE 11.24 9.82 87.37 1
1469 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Mondalgram Piped Water Supply Scheme , SM/07822 Retrofitting Construction of Pump House cum chlorine room without sanitary and water supply arrangement at Tube Well Site to departmental drawing no-PHE/BD/P.H/DRG/02/DEC-17(Size 3.60 mtr x 3.00 mtr room) for MONDALGRAM its Adjoining Mouza W/S Scheme, Block -Memari-II within Burdwan Sub-Division, PHE Dte. (Mouza- Untia) Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER RWS BURDWAN SUB-DIVISION PHE DTE ORD/000840/2022-2023 508/BSD 21/03/2023 45 NARSAD SAIKH 3.12 2.55 81.73 100
1470 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Mondalgram Piped Water Supply Scheme , SM/07822 Retrofitting Additional quotation for Untia PHE of Augmentation of Mondalgram water supply scheme.[Memo No.-SGA/ADDL/QUOTI, Dated-21/06/23] BILL/00239/2023-2024 358/JJM 14/07/2023 0 WEST BENGAL BUILDING AND OTHER CONSTRUCTION WORKERS WELFARE FUND 2.16 0.00 0 0
1471 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Mondalgram Piped Water Supply Scheme , SM/07822 Retrofitting Quotation of New connection charges at Augmentation of Mondalgram water supply scheme. [Application No.-5003701437] BILL/00065/2023-2024 152/JJM 26/05/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LTD. 0.64 0.00 0 0
1472 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Mondalgram Piped Water Supply Scheme , SM/07822 Retrofitting Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of MONDALGRAM Piped Water Supply Scheme at Bamunia (Part) (4 Nos. Habs.), Bhigobanpur, Halaodharpur (Part) (2 Nos. Habs.), Mondalgram (Part) (10 Nos. Habs.), Saragachi & Malamba Village (Mouza), Memari - II Block under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000479/2021-2022 994/BWD 21/02/2022 60 SUPRIYA RAY 61.24 53.61 87.54 70
1473 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Mondalgram Piped Water Supply Scheme , SM/07822 Retrofitting Left out Functional House hold Tap Connection (FHTC) for MONDALGRAM and its adjoining Mouza W/S Scheme, block ¿Memari II within Burdwan Sub-Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER RWS BURDWAN SUB-DIVISION PHE DTE ORD/000773/2022-2023 1326/BWD 22/03/2023 60 DEBASHISH ENTERPRISE 30.33 11.06 36.47 35
1474 PURBA BARDHAMAN Purbasthali-I Burdwan Division KAMALPUR PIPED WATER SUPPLY SCHEME , SM/13453 New Material Requisition To Resource Division RTOR000502/2023-2024 4026/BWD 08/09/2023 0 Resource Division 0.98 0.00 0 0
1475 PURBA BARDHAMAN Purbasthali-I Central Mechanical KAMALPUR PIPED WATER SUPPLY SCHEME , SM/13453 New New service connection charges for Kamalpur PWSS TW-1 BILL/02215/2023-2024 BP-2023-24-388 17/01/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.38 0.00 0 0
1476 PURBA BARDHAMAN Purbasthali-I Central Mechanical KAMALPUR PIPED WATER SUPPLY SCHEME , SM/13453 New New service connection for KAMALPUR PWSS TW-2. BILL/02399/2023-2024 BP-2023-24-501 06/02/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 5.24 0.00 0 0
1477 PURBA BARDHAMAN Purbasthali-I Burdwan Division KAMALPUR PIPED WATER SUPPLY SCHEME , SM/13453 New Different works related (sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of different capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site) to KACHUA & KAMALPUR Piped Water Supply Scheme under Purbasthali ¿ I Block, District:- Purba Bardhaman [NEW SCHEME] Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000133/2023-2024 2344/BWD 22/05/2023 863 CONCORD ENGINEERING 470.92 80.93 17.19 40
1478 PURBA BARDHAMAN Purbasthali-I Burdwan Division KAMALPUR PIPED WATER SUPPLY SCHEME , SM/13453 New Different types of works involve in connection with Augmentation of SRIRAMPUR (Zone I & II) (SM/08103), MANGANPUR (SM/13327), KAMALPUR (SM/13453) Piped Water Supply Scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000190/2024-2025 2429/BWD 27/06/2024 480 S.P. CONSTRUCTION 500.89 0.00 0 2
1479 PURBA BARDHAMAN Memari-I Burdwan Division SAHAPUR PIPED WATER SUPPLY SCHEME , SM/13425 New Material Requisition To Resource Division RTOR000067/2022-2023 1262/BWD 17/03/2023 0 Resource Division 7.32 0.00 0 0
1480 PURBA BARDHAMAN Memari-I Burdwan Division SAHAPUR PIPED WATER SUPPLY SCHEME , SM/13425 New Material Requisition To Resource Division RTOR000500/2023-2024 4024/BWD 08/09/2023 0 Resource Division 2.93 0.00 0 0
1481 PURBA BARDHAMAN Memari-I Burdwan Division SAHAPUR PIPED WATER SUPPLY SCHEME , SM/13425 New Material Requisition To Resource Division RTOR000690/2023-2024 5074/BWD 23/11/2023 0 Resource Division 20.46 0.00 0 0
1482 PURBA BARDHAMAN Memari-I Central Mechanical SAHAPUR PIPED WATER SUPPLY SCHEME , SM/13425 New New Service Connection charges for Sahapur W/S Scheme TW-1 BILL/00602/2023-2024 BP-2023-24-13 17/05/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 2.90 0.00 0 0
1483 PURBA BARDHAMAN Memari-I Central Mechanical SAHAPUR PIPED WATER SUPPLY SCHEME , SM/13425 New New Service Connection charges for Sahapur W/S Scheme TW-2 BILL/00603/2023-2024 BP-2023-24-14 17/05/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.08 0.00 0 0
1484 PURBA BARDHAMAN Memari-I Central Mechanical SAHAPUR PIPED WATER SUPPLY SCHEME , SM/13425 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at SAHAPUR & others water supply scheme under Memari-I Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. ASSISTANT ENGINEER Junior Engineer ORD/000100/2024-2025 2392/CMD 02/08/2024 90 MITRA ENTERPRISE 47.62 0.00 0 0
1485 PURBA BARDHAMAN Memari-I Burdwan Division SAHAPUR PIPED WATER SUPPLY SCHEME , SM/13425 New SAHAPUR Piped Water Supply Scheme with Sinking of tube-well, LDS, Rising Main, FHTC, Construction of 150 cum capacity RCC OHR with 20.0 mtr. with Staging height including soil investigation & construction of switch-rooms & boundary walls at different TW site under Memari-I Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000636/2022-2023 82/BWD 09/01/2023 365 S.K. CONSTRUCTION 256.31 256.03 99.89 100
1486 PURBA BARDHAMAN Memari-I Burdwan Division SAHAPUR PIPED WATER SUPPLY SCHEME , SM/13425 New Rest portion of OHR (Plaster, Painting and interconnection of Rising Main with Specials) at SAHAPUR Piped Water Supply Scheme under Memari-I Block within Burdwan Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000188/2024-2025 2419/BWD 27/06/2024 90 S.K. CONSTRUCTION 20.60 13.33 64.71 100
1487 PURBA BARDHAMAN Memari-I Central Mechanical SAHAPUR PIPED WATER SUPPLY SCHEME , SM/13425 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at Sahapur Water Supply Scheme [Block- Memari-1] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER Junior Engineer ORD/000037/2023-2024 2480/CMD 31/05/2023 30 P.K. ENGINEERING 29.29 24.00 81.94 98
1488 PURBA BARDHAMAN Memari-I Burdwan Division SAHAPUR PIPED WATER SUPPLY SCHEME , SM/13425 New Conducting physical Household Survey at the IMIS reported village for HGJ certification and providing balance FHTC for Har Ghar Jal certification including conducting Gram Sabhas for different IMIS reported villages across the district under Burdwan Division, PHE Dte. AE(HQs),Assistant Engineer ,Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE.,Assistant Engineer, Durgapur Sub Division, P.H.E. Dte JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000428/2024-2025 3107/BWD 12/08/2024 323 TUBGRAM GRAMMYAK UNNAYAN SAMITY 309.60 0.00 0 85
1489 PURBA BARDHAMAN Memari-I Burdwan Division SAHAPUR PIPED WATER SUPPLY SCHEME , SM/13425 New Designing, making and erection of Sign Board for SWAJAL GRAM in Sekhpur village of Memari-I Block under Sahapur Piped Water Supply Scheme within Burdwan Sub-Division under Burdwan Division, PHE Dte (5 nos Board) JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000614/2025-2026 2370/BSD 21/08/2025 10 RAJ-N-MAHARAJ MANPOWER & SECURITY SOLUTIONS 0.72 0.00 0 0
1490 PURBA BARDHAMAN Memari-I Burdwan Division SAHAPUR PIPED WATER SUPPLY SCHEME , SM/13425 New Designing,making and erection of Sign Board for SWAJAL GRAM in Nagarkona village of Memari-I Block under Sahapur Piped Water Supply Scheme within Burdwan Sub-Division under Burdwan Division,PHE Dte (5 Nos. Board) JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000441/2025-2026 2306/BSD 19/08/2025 10 RAJ-N-MAHARAJ MANPOWER & SECURITY SOLUTIONS 0.72 0.00 0 0
1491 PURBA BARDHAMAN Memari-I Burdwan Division SAHAPUR PIPED WATER SUPPLY SCHEME , SM/13425 New Designing, making and erection of Sign Board for SWAJAL GRAM in Sahapur village of Memari-I Block under Sahapur Piped Water Supply Scheme within Burdwan Sub-Division under Burdwan Division,PHE Dte(5 nos Board) JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000471/2025-2026 2337/BSD 21/08/2025 10 RAJ-N-MAHARAJ MANPOWER & SECURITY SOLUTIONS 0.72 0.00 0 0
1492 PURBA BARDHAMAN Burdwan-II Burdwan Division Baikunthapur Piped Water Supply Scheme , SM/13294 New Material Requisition To Resource Division RTOR000020/2023-2024 1962/BWD 25/04/2023 0 Resource Division 4.39 0.00 0 0
1493 PURBA BARDHAMAN Burdwan-II Burdwan Division Baikunthapur Piped Water Supply Scheme , SM/13294 New Material Requisition To Resource Division RTOR000218/2023-2024 2155/BWD 10/05/2023 0 Resource Division 1.97 0.00 0 0
1494 PURBA BARDHAMAN Burdwan-II Burdwan Division Baikunthapur Piped Water Supply Scheme , SM/13294 New Material Requisition To Resource Division RTOR000707/2023-2024 5044/BWD 23/11/2023 0 Resource Division 20.46 0.00 0 0
1495 PURBA BARDHAMAN Burdwan-II Central Mechanical Baikunthapur Piped Water Supply Scheme , SM/13294 New Hiring of inspection vehicle (Diesel/CNG/LPG Driven) for supervision of site for the office of the Assistant Engineer,under CMD PHE Dte. w.e.f -01/08/2024 to 30/09/2024 .[Under JJM Works] ASSISTANT ENGINEER Junior Engineer ORD/000418/2024-2025 834/CMSD 07/06/2024 61 PRODYUT GHOSH 0.80 0.79 98.75 0
1496 PURBA BARDHAMAN Burdwan-II Central Mechanical Baikunthapur Piped Water Supply Scheme , SM/13294 New New service connection at BAIAKUNTHAPUR PWSS Ph-2 BILL/02326/2023-2024 BP-2023-24-443 29/01/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.73 0.00 0 0
1497 PURBA BARDHAMAN Burdwan-II Central Mechanical Baikunthapur Piped Water Supply Scheme , SM/13294 New New service connection at BAIAKUNTHAPUR PWSS Ph-1 BILL/02325/2023-2024 BP-2023-24-442 29/01/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 7.45 0.00 0 0
1498 PURBA BARDHAMAN Burdwan-II Burdwan Division Baikunthapur Piped Water Supply Scheme , SM/13294 New Shifting of pole for laying of water supply pipeline of Baikunthapur pwss under Burdwan Division, PHE Dte. [Ref ID-860315315, Application ID-100000120685, dt.-01/10/2024] BILL/01091/2024-2025 1173/JJM 17/12/2024 0 WBSEDCL 0.89 0.00 0 0
1499 PURBA BARDHAMAN Burdwan-II Central Mechanical Baikunthapur Piped Water Supply Scheme , SM/13294 New New service connection charges for Baikunthapur PWSS TW-2 BILL/02940/2023-2024 BP-2023-24-517 08/02/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 0.48 0.00 0 0
1500 PURBA BARDHAMAN Burdwan-II Burdwan Division Baikunthapur Piped Water Supply Scheme , SM/13294 New Different works related (sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of different capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site) to AMRA & BAIKUNTHAPUR Piped Water Supply Scheme under Burdwan II Block, District:- Purba Bardhaman [NEW SCHEME] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. Junior Engineer, Burdwan Sadar Sub-Division ORD/000089/2023-2024 2214/BWD 15/05/2023 839 CONCORD ENGINEERING 750.87 213.55 28.44 55
1501 PURBA BARDHAMAN Burdwan-II Central Mechanical Baikunthapur Piped Water Supply Scheme , SM/13294 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at Baikunthapur Water Supply Scheme [ Block- Burdwan-2 ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER Junior Engineer ORD/000663/2023-2024 4006/CMD 29/08/2023 30 A.S. ENTERPRISE 28.95 5.20 17.96 100
1502 PURBA BARDHAMAN Burdwan-II Central Mechanical Baikunthapur Piped Water Supply Scheme , SM/13294 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at KUSHA & others water supply scheme under Bardhaman-II Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman ASSISTANT ENGINEER Junior Engineer ORD/000065/2024-2025 2389/CMD 02/08/2024 90 DILIP MAHATO 53.14 0.00 0 12
1503 PURBA BARDHAMAN Burdwan-II Burdwan Division Amra Piped Water Supply Scheme , SM/13296 New Material Requisition To Resource Division RTOR000018/2023-2024 1962/BWD 25/04/2023 0 Resource Division 2.95 0.00 0 0
1504 PURBA BARDHAMAN Burdwan-II Burdwan Division Amra Piped Water Supply Scheme , SM/13296 New Material Requisition To Resource Division RTOR000701/2023-2024 5060/BWD 23/11/2023 0 Resource Division 20.46 0.00 0 0
1505 PURBA BARDHAMAN Burdwan-II Burdwan Division Amra Piped Water Supply Scheme , SM/13296 New Continuation Work for the supply of one no. Diesel driven Motor Cab/Maxi Cab (Air Conditioner) on hire basis for the office of the Assistant Engineer, to be used by the Assistant Engineer, RWS Burdwan Sub-Divn., PHE. Dte. (Period from 01/05/2024 to 30/06/2024) Contractual Junior Engineer,Junior Engineer, R.W.S. Burdwan Sub Division, P.H.E. Dt ORD/000151/2024-2025 154/RWS 29/04/2024 61 MD HASIN 0.80 0.55 68.75 0
1506 PURBA BARDHAMAN Burdwan-II Burdwan Division Amra Piped Water Supply Scheme , SM/13296 New Material Requisition To Resource Division RTOR000771/2023-2024 195/BWD 10/01/2024 0 Resource Division 5.52 0.00 0 0
1507 PURBA BARDHAMAN Burdwan-II Central Mechanical Amra Piped Water Supply Scheme , SM/13296 New New Service connection forAmra PWSS TW-2. BILL/02336/2023-2024 BP-2023-24-473 31/01/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 16.94 0.00 0 0
1508 PURBA BARDHAMAN Burdwan-II Central Mechanical Amra Piped Water Supply Scheme , SM/13296 New New Service connection for Amra PWSS TW-1. BILL/02337/2023-2024 BP-2023-24-472 31/01/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 8.51 0.00 0 0
1509 PURBA BARDHAMAN Burdwan-II Burdwan Division Amra Piped Water Supply Scheme , SM/13296 New Different works related (sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of different capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site) to AMRA & BAIKUNTHAPUR Piped Water Supply Scheme under Burdwan II Block, District:- Purba Bardhaman [NEW SCHEME] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. Junior Engineer, Burdwan Sadar Sub-Division ORD/000089/2023-2024 2214/BWD 15/05/2023 839 CONCORD ENGINEERING 750.87 52.78 7.03 55
1510 PURBA BARDHAMAN Burdwan-II Central Mechanical Amra Piped Water Supply Scheme , SM/13296 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at KUSHA & others water supply scheme under Bardhaman-II Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman ASSISTANT ENGINEER Junior Engineer ORD/000065/2024-2025 2389/CMD 02/08/2024 90 DILIP MAHATO 53.14 0.00 0 12
1511 PURBA BARDHAMAN Khandaghosh Burdwan Division RUPSA PIPED WATER SUPPLY SCHEME , SM/13298 New Material Requisition To Resource Division RTOR000079/2023-2024 1962/BWD 25/04/2023 0 Resource Division 8.10 0.00 0 0
1512 PURBA BARDHAMAN Khandaghosh Burdwan Division RUPSA PIPED WATER SUPPLY SCHEME , SM/13298 New Material Requisition To Resource Division RTOR000199/2023-2024 2155/BWD 10/05/2023 0 Resource Division 20.06 0.00 0 0
1513 PURBA BARDHAMAN Khandaghosh Burdwan Division RUPSA PIPED WATER SUPPLY SCHEME , SM/13298 New Material Requisition To Resource Division RTOR000731/2023-2024 5238/BWD 30/11/2023 0 Resource Division 21.07 0.00 0 0
1514 PURBA BARDHAMAN Khandaghosh Burdwan Division RUPSA PIPED WATER SUPPLY SCHEME , SM/13298 New Continuation order for Supply of 01(one) No. Diesel Driven Motor Cab (Bharat Stage-II) on hire basis for the office of the Assistant Engineer, Durgapur Sub-Division (Burdwan North) P.H.E. Dte. Govt. of West Bengal (for the period of 01/01/2024 to 31/05/2024) Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer1, Durgapur Sub-Division, PHE Dte. ORD/001180/2023-2024 995/DSD 29/12/2023 183 SUJAUDDIN SEKH 2.00 0.40 20 60
1515 PURBA BARDHAMAN Khandaghosh Central Mechanical RUPSA PIPED WATER SUPPLY SCHEME , SM/13298 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at BICHKHARA & others water supply scheme under Khandoghosh Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman ASSISTANT ENGINEER Junior Engineer ORD/000064/2024-2025 2390/CMD 02/08/2024 90 MS DAS ELECTRIC CO 46.54 0.00 0 0
1516 PURBA BARDHAMAN Khandaghosh Central Mechanical RUPSA PIPED WATER SUPPLY SCHEME , SM/13298 New New service connection for Rupsa W/S scheme TW No-1 BILL/02275/2023-2024 BP-2023-24-410 19/01/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 5.27 0.00 0 0
1517 PURBA BARDHAMAN Khandaghosh Central Mechanical RUPSA PIPED WATER SUPPLY SCHEME , SM/13298 New Quotation for new service connection at RUPSA PWSS PH-2 BILL/00384/2024-2025 BP-2024-25-201 18/07/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 5.00 0.00 0 0
1518 PURBA BARDHAMAN Khandaghosh Burdwan Division RUPSA PIPED WATER SUPPLY SCHEME , SM/13298 New Different works related (sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of different capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site) to AMRA, BALABATI, UKHRID & RUPSA Piped Water Supply Scheme under KHANDAGHOSH Block, District:- Purba Bardhaman [NEW SCHEME] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer1, Durgapur Sub-Division, PHE Dte.,Junior Engineer2, Durgapur Sub-Division, PHE Dte. ORD/000008/2023-2024 1726/BWD 13/04/2023 902 S.P. CONSTRUCTION 1,710.27 230.92 13.5 45
1519 PURBA BARDHAMAN Khandaghosh Central Mechanical RUPSA PIPED WATER SUPPLY SCHEME , SM/13298 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at Rupsa Water Supply Scheme [ Block- Khandogosh ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER Junior Engineer ORD/000706/2023-2024 4013/CMD 29/08/2023 30 SAIKAT ENTERPRISE 28.98 11.24 38.79 85
1520 PURBA BARDHAMAN Khandaghosh Burdwan Division RUPSA PIPED WATER SUPPLY SCHEME , SM/13298 New Balance work for providing Functional Household Tap Connection (FHTC) within the command area BALABATI, AMRA & RUPSA W/S. Scheme of Khandaghosh Block under Burdwan Division, PHE. Dte. Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer1, Durgapur Sub-Division, PHE Dte. ORD/001189/2024-2025 609/BWD 11/02/2025 120 M/S S.S. ENTERPRISE 194.58 0.00 0 0
1521 PURBA BARDHAMAN Bhatar Burdwan Division EORA PIPED WATER SUPPLY SCHEME , SM/13968 New Material Requisition To Resource Division RTOR000187/2023-2024 2155/BWD 10/05/2023 0 Resource Division 23.59 0.00 0 0
1522 PURBA BARDHAMAN Bhatar Burdwan Division EORA PIPED WATER SUPPLY SCHEME , SM/13968 New Material Requisition To Resource Division RTOR000750/2023-2024 5249/BWD 30/11/2023 0 Resource Division 18.50 0.00 0 0
1523 PURBA BARDHAMAN Bhatar Burdwan Division EORA PIPED WATER SUPPLY SCHEME , SM/13968 New Material Requisition To Resource Division RTOR000443/2023-2024 3833/BWD 01/09/2023 0 Resource Division 3.71 0.00 0 0
1524 PURBA BARDHAMAN Bhatar Central Mechanical EORA PIPED WATER SUPPLY SCHEME , SM/13968 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Karjana & others water supply scheme under Bhatar Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000067/2024-2025 2394/CMD 02/08/2024 90 AHALYA ENGINEERING WORKS 82.00 0.00 0 0
1525 PURBA BARDHAMAN Bhatar Central Mechanical EORA PIPED WATER SUPPLY SCHEME , SM/13968 New NEW SERVICE CONNECTION FOR EORA PWSS BILL/02596/2023-2024 BP-2023-24-548 20/02/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.64 0.00 0 0
1526 PURBA BARDHAMAN Bhatar Central Mechanical EORA PIPED WATER SUPPLY SCHEME , SM/13968 New NEW SERVICE CONNECTION FOR EORA PWSS TW -1. BILL/03102/2023-2024 BP-2023-24-642 15/03/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 6.54 0.00 0 0
1527 PURBA BARDHAMAN Bhatar Burdwan Division EORA PIPED WATER SUPPLY SCHEME , SM/13968 New EORA Piped Water Supply Scheme with sinking of Tube-well, LDS, Rising Main, FHTC & construction of switch rooms & boundary walls with gates and land development, drain and internal pathway at different TW site under Bhatar Block, District:- Purba-Bardhaman [NEW SCHEME]. Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer ,JUNIOR ENGINEER DURGAPUR SUB-DIVISION PHE DTE ORD/000062/2023-2024 1936/BWD 24/04/2023 865 TUSHAR KANTI GHOSH 79.02 49.97 63.24 100
1528 PURBA BARDHAMAN Bhatar Central Mechanical EORA PIPED WATER SUPPLY SCHEME , SM/13968 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at Eora Water Supply Scheme [ Block- Bhatar ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000746/2023-2024 4056/CMD 29/08/2023 990 SUNRISE ENGINEERING CORPORATION 26.98 20.94 77.61 90
1529 PURBA BARDHAMAN Bhatar Burdwan Division EORA PIPED WATER SUPPLY SCHEME , SM/13968 New Road Restoration for Eora PWSS in Bhatar Block under Durgapur Sub-Division under Burdwan Division, P.H.E. Dte. JUNIOR ENGINEER DURGAPUR SUB-DIVISION PHE DTE ORD/000429/2024-2025 624/DSD 05/08/2024 30 KOHINOOR CONSTRUCTION CO. 5.38 0.00 0 0
1530 PURBA BARDHAMAN Katwa-II Burdwan Division KALIKAPUR PIPED WATER SUPPLY SCHEME , SM/14053 New Material Requisition To Resource Division RTOR000111/2022-2023 1645/BWD 06/04/2023 0 Resource Division 14.26 0.00 0 0
1531 PURBA BARDHAMAN Katwa-II Burdwan Division KALIKAPUR PIPED WATER SUPPLY SCHEME , SM/14053 New Material Requisition To Resource Division RTOR000063/2022-2023 1259/BWD 17/03/2023 0 Resource Division 17.21 0.00 0 0
1532 PURBA BARDHAMAN Katwa-II Central Mechanical KALIKAPUR PIPED WATER SUPPLY SCHEME , SM/14053 New New service connection charges for Kalikapur PWSS TW-1 BILL/01444/2023-2024 BP-2023-24-155 07/09/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 9.07 0.00 0 0
1533 PURBA BARDHAMAN Katwa-II Central Mechanical KALIKAPUR PIPED WATER SUPPLY SCHEME , SM/14053 New New service connection charges for Kalikapur PWSS TW-2 BILL/01469/2023-2024 BP-2023-24-170 27/09/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.43 0.00 0 0
1534 PURBA BARDHAMAN Katwa-II Central Mechanical KALIKAPUR PIPED WATER SUPPLY SCHEME , SM/14053 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at Kalikapur Water Supply Scheme [ Block- Katwa-2 ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. Driller In-Charge Junior Engineer ORD/000596/2023-2024 3953/CMD 24/08/2023 30 M/S, S.S. ENTERPRISE. 29.61 23.40 79.03 90
1535 PURBA BARDHAMAN Katwa-II Burdwan Division KALIKAPUR PIPED WATER SUPPLY SCHEME , SM/14053 New Continuation Work Order for Supply of 1 (one) No. Inspection Vehicle for different JJM Related Works as and when required including supply of driver and fuels (Minimum 8 Hours of duty) under Katwa Sub-Division within Burdwan Division, P.H.E. Dte. Consider 96.00 Km run per Day Assistant Engineer JUNIOR ENGINEER KATWA SUB-DIVISION PHE DTE ORD/000683/2024-2025 1009/KTS 19/07/2024 60 AJIT SAMANTA 0.77 0.23 29.87 100
1536 PURBA BARDHAMAN Katwa-II Central Mechanical KALIKAPUR PIPED WATER SUPPLY SCHEME , SM/14053 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Mulgram & others water supply scheme under Katwa-II Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. ASSISTANT ENGINEER Junior Engineer ORD/000070/2024-2025 2409/CMD 02/08/2024 90 DUTTA ENTERPRISE 50.18 0.00 0 0
1537 PURBA BARDHAMAN Katwa-II Burdwan Division KALIKAPUR PIPED WATER SUPPLY SCHEME , SM/14053 New KALIKAPUR Piped Water Supply Scheme with sinking of Tube-well, LDS, Rising Main, FHTC, Construction of 400 cum capacity RCC OHR with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drain and internal pathway at different TW site under KATWA -II Block, District:- Purba-Bardhaman [NEW SCHEME]. Assistant Engineer JUNIOR ENGINEER KATWA SUB-DIVISION PHE DTE ORD/000732/2022-2023 1047/BWD 09/03/2023 968 PASCON 629.59 351.46 55.82 67
1538 PURBA BARDHAMAN Katwa-II Burdwan Division KALIKAPUR PIPED WATER SUPPLY SCHEME , SM/14053 New Balance work of OHR, Functional Household Tap Connection, Road restoration etc. for Kalikapur PWSS under KATWA -II Block under Katwa Sub-Division under Burdwan Division, PHED, District:- Purba-Bardhaman. Assistant Engineer JUNIOR ENGINEER KATWA SUB-DIVISION PHE DTE ORD/001040/2024-2025 192/BWD 08/01/2025 120 PASCON 57.78 0.00 0 90
1539 PURBA BARDHAMAN Katwa-II Burdwan Division KALIKAPUR PIPED WATER SUPPLY SCHEME , SM/14053 New Continuation work order for Hiring of one no Diesel Motor Cab (BS-VI) including the cost of fuel . mobile & other charges for the inspection of the different projects of JJM for the office of the Assistant Engineer, Katwa Sub-Division, PHE Dte. (Period:- 01/09/2025 to 28/02/2026) ORD/000723/2025-2026 1907/KTS 01/09/2025 181 HAMID SK 1.84 0.00 0 0
1540 PURBA BARDHAMAN Katwa-II Burdwan Division SRIBATI PIPED WATER SUPPLY SCHEME , SM/14055 New Supply of 1 (one) No. Inspection Vehicle for different JJM Related Works as and when required including supply of driver and fuels (Minimum 8 Hours of duty) under Katwa Sub-Division within Burdwan Division, P.H.E. Dte. Consider 96.00 Km run per Day.(Sl No-1) ORD/000510/2023-2024 499/KTS 22/05/2023 70 M/S MUNMUN DEY 0.90 0.30 33.33 100
1541 PURBA BARDHAMAN Katwa-II Burdwan Division SRIBATI PIPED WATER SUPPLY SCHEME , SM/14055 New Material Requisition To Resource Division RTOR000110/2022-2023 1633/BWD 06/04/2023 0 Resource Division 9.14 0.00 0 0
1542 PURBA BARDHAMAN Katwa-II Burdwan Division SRIBATI PIPED WATER SUPPLY SCHEME , SM/14055 New Material Requisition To Resource Division RTOR000061/2022-2023 1258/BWD 17/03/2023 0 Resource Division 17.24 0.00 0 0
1543 PURBA BARDHAMAN Katwa-II Central Mechanical SRIBATI PIPED WATER SUPPLY SCHEME , SM/14055 New New service connection charges for Sribati PWSS TW-2 BILL/00755/2023-2024 BP-2023-24-61 17/07/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 2.58 0.00 0 0
1544 PURBA BARDHAMAN Katwa-II Central Mechanical SRIBATI PIPED WATER SUPPLY SCHEME , SM/14055 New New service connection charges for SribatiPWSS TW-1 BILL/00881/2023-2024 BP-2023-24-111 09/08/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 6.83 0.00 0 0
1545 PURBA BARDHAMAN Katwa-II Burdwan Division SRIBATI PIPED WATER SUPPLY SCHEME , SM/14055 New SRIBATI Piped Water Supply Scheme with sinking of Tube-well, LDS, Rising Main, FHTC, Construction of 400 cum capacity RCC OHR with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drain and internal pathway at different TW site under KATWA -II Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer JUNIOR ENGINEER KATWA SUB-DIVISION PHE DTE ORD/000710/2022-2023 776/BWD 24/02/2023 677 MANASH GHOSH 629.32 531.60 84.47 80
1546 PURBA BARDHAMAN Katwa-II Central Mechanical SRIBATI PIPED WATER SUPPLY SCHEME , SM/14055 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at Sribati Water Supply Scheme [ Block- Katwa-2 ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. Driller In-Charge Junior Engineer ORD/000059/2023-2024 2520/CMD 02/06/2023 30 S.K. ELECTRICALS 29.60 0.00 0 48
1547 PURBA BARDHAMAN Katwa-II Central Mechanical SRIBATI PIPED WATER SUPPLY SCHEME , SM/14055 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Mulgram & others water supply scheme under Katwa-II Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. ASSISTANT ENGINEER Junior Engineer ORD/000070/2024-2025 2409/CMD 02/08/2024 90 DUTTA ENTERPRISE 50.18 0.00 0 0
1548 PURBA BARDHAMAN Katwa-II Burdwan Division SRIBATI PIPED WATER SUPPLY SCHEME , SM/14055 New Material Requisition To Resource Division RTOR000787/2023-2024 321/BWD 24/01/2024 0 Resource Division 26.68 0.00 0 0
1549 PURBA BARDHAMAN Katwa-II Central Mechanical SRIBATI PIPED WATER SUPPLY SCHEME , SM/14055 New SUPPLY AND INSTALLATION WORKS FOR SRIBATI PWSS BILL/02622/2023-2024 BP-2023-24-559 21/02/2024 0 S.K. ELECTRICALS 23.73 0.00 0 0
1550 PURBA BARDHAMAN Mangolkote Burdwan Division JABAGRAM PIPED WATER SUPPLY SCHEME , SM/14980 New Material Requisition To Resource Division RTOR000112/2022-2023 1646/BWD 06/04/2023 0 Resource Division 1.65 0.00 0 0
1551 PURBA BARDHAMAN Mangolkote Burdwan Division JABAGRAM PIPED WATER SUPPLY SCHEME , SM/14980 New Material Requisition To Resource Division RTOR000060/2022-2023 1257/BWD 17/03/2023 0 Resource Division 13.53 0.00 0 0
1552 PURBA BARDHAMAN Mangolkote Burdwan Division JABAGRAM PIPED WATER SUPPLY SCHEME , SM/14980 New Material Requisition To Resource Division RTOR000703/2023-2024 5061/BWD 23/11/2023 0 Resource Division 19.78 0.00 0 0
1553 PURBA BARDHAMAN Mangolkote Central Mechanical JABAGRAM PIPED WATER SUPPLY SCHEME , SM/14980 New New Service connection charges for Jabagram W/S Scheme TW-I BILL/00572/2023-2024 BP-2023-24-8 12/05/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 0.81 0.00 0 0
1554 PURBA BARDHAMAN Mangolkote Burdwan Division JABAGRAM PIPED WATER SUPPLY SCHEME , SM/14980 New Continuation order for Supply of 1 (one) No. Inspection Vehicle for different JJM Related Works as and when required including supply of driver and fuels (Minimum 8 Hours of duty) under Katwa Sub-Division within Burdwan Division, P.H.E. Dte. Consider 96.00 Km run per Day. (Sl No-1) Assistant Engineer JUNIOR ENGINEER KATWA SUB-DIVISION PHE DTE ORD/000930/2023-2024 1016/KTS 20/09/2023 23 M/S MUNMUN DEY 0.30 0.09 30 0
1555 PURBA BARDHAMAN Mangolkote Central Mechanical JABAGRAM PIPED WATER SUPPLY SCHEME , SM/14980 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Jabagram & others water supply scheme under Mangalkote Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. Driller In-Charge Junior Engineer ORD/000118/2024-2025 2590/CMD 27/08/2024 90 M/S SAJAHAN CHOWDHURY 62.06 0.00 0 0
1556 PURBA BARDHAMAN Mangolkote Central Mechanical JABAGRAM PIPED WATER SUPPLY SCHEME , SM/14980 New NEW SERVICE CONNECTION FOR JABAGRAM PWSS TW-2. BILL/00008/2024-2025 BP-2024-25-1 04/04/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 5.75 0.00 0 0
1557 PURBA BARDHAMAN Mangolkote Burdwan Division JABAGRAM PIPED WATER SUPPLY SCHEME , SM/14980 New Different works related (sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of different capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site) to GOHAGRAM, KHERUA & JABAGRAM Piped Water Supply Scheme under Mangalkote Block, District:- Purba Bardhaman [NEW SCHEME] Assistant Engineer JUNIOR ENGINEER KATWA SUB-DIVISION PHE DTE,JUNIOR ENGINEER R.W.S. BURDWAN SUB-DIVISION PHE DTE ORD/000697/2022-2023 582/BWD 17/02/2023 1049 PUSPA ENTERPRISE 1,185.88 380.48 32.08 75
1558 PURBA BARDHAMAN Mangolkote Burdwan Division JABAGRAM PIPED WATER SUPPLY SCHEME , SM/14980 New Different types of works involve in connection with implementation of Gohgram, Jabagram, Kherua, Lakshmipur & Simulia Piped Water Supply Scheme under Mongolkote Block within Katwa Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer ORD/001301/2024-2025 936/BWD 11/03/2025 180 M/S GHOSH CONSTRUCTION 360.68 0.00 0 0
1559 PURBA BARDHAMAN Burdwan-I Burdwan Division KASHIARA PIPED WATER SUPPLY SCHEME , SM/14075 New Material Requisition To Resource Division RTOR000098/2023-2024 1962/BWD 25/04/2023 0 Resource Division 1.83 0.00 0 0
1560 PURBA BARDHAMAN Burdwan-I Burdwan Division KASHIARA PIPED WATER SUPPLY SCHEME , SM/14075 New Material Requisition To Resource Division RTOR000317/2023-2024 2197/BWD 12/05/2023 0 Resource Division 7.97 0.00 0 0
1561 PURBA BARDHAMAN Burdwan-I Burdwan Division KASHIARA PIPED WATER SUPPLY SCHEME , SM/14075 New Material Requisition To Resource Division RTOR000722/2023-2024 5265/BWD 30/11/2023 0 Resource Division 21.07 0.00 0 0
1562 PURBA BARDHAMAN Burdwan-I Central Mechanical KASHIARA PIPED WATER SUPPLY SCHEME , SM/14075 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at Kashiara Water Supply Scheme [ Block- Burdwan-1 ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER Junior Engineer ORD/000656/2023-2024 3999/CMD 29/08/2023 30 MENAKA ENTERPRISE. 28.98 22.53 77.74 90
1563 PURBA BARDHAMAN Burdwan-I Central Mechanical KASHIARA PIPED WATER SUPPLY SCHEME , SM/14075 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at MALKITA & others water supply scheme under Bardhaman-I Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman ASSISTANT ENGINEER Junior Engineer ORD/000066/2024-2025 2388/CMD 02/08/2024 90 ELECTRICAL & MECHANICAL ENGINEERING CORPORATION 55.95 0.00 0 0
1564 PURBA BARDHAMAN Burdwan-I Central Mechanical KASHIARA PIPED WATER SUPPLY SCHEME , SM/14075 New New service connection for Kashiara W/S Scheme. BILL/02189/2023-2024 BP-2023-24-384 16/01/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 2.91 0.00 0 0
1565 PURBA BARDHAMAN Burdwan-I Central Mechanical KASHIARA PIPED WATER SUPPLY SCHEME , SM/14075 New New service connection charges for Kashiara PWSS TW-2 BILL/02207/2023-2024 BP-2023-24-398 17/01/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.22 0.00 0 0
1566 PURBA BARDHAMAN Burdwan-I Burdwan Division KASHIARA PIPED WATER SUPPLY SCHEME , SM/14075 New Sinking of Tube-wells, LDS, Rising Main, FHTC, Construction of 350 cum capacity RCC OHR with 20.0 mtr. with Staging height including soil investigation, construction of switch room, boundary walls with gates, land development, surface drains and internal pathways at different TW site for KASHIARA Piped Water Supply Scheme under BURDWAN I Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000480/2023-2024 256/BWD 09/08/2023 836 PUSPA ENTERPRISE 597.52 240.68 40.28 70
1567 PURBA BARDHAMAN Burdwan-I Central Mechanical JAGADABAD PIPED WATER SUPPLY SCHEME , SM/13945 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at Jagadbad Water Supply Scheme [ Block- Burdwan-1 ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER Junior Engineer ORD/000654/2023-2024 3997/CMD 29/08/2023 30 CHOUDHURY ENTERPRISE 28.93 0.00 0 0
1568 PURBA BARDHAMAN Burdwan-I Burdwan Division JAGADABAD PIPED WATER SUPPLY SCHEME , SM/13945 New Material Requisition To Resource Division RTOR000094/2023-2024 1962/BWD 25/04/2023 0 Resource Division 8.29 0.00 0 0
1569 PURBA BARDHAMAN Burdwan-I Burdwan Division JAGADABAD PIPED WATER SUPPLY SCHEME , SM/13945 New Material Requisition To Resource Division RTOR000286/2023-2024 2197/BWD 12/05/2023 0 Resource Division 17.21 0.00 0 0
1570 PURBA BARDHAMAN Burdwan-I Burdwan Division JAGADABAD PIPED WATER SUPPLY SCHEME , SM/13945 New Material Requisition To Resource Division RTOR000718/2023-2024 5274/BWD 30/11/2023 0 Resource Division 21.07 0.00 0 0
1571 PURBA BARDHAMAN Burdwan-I Central Mechanical JAGADABAD PIPED WATER SUPPLY SCHEME , SM/13945 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at MALKITA & others water supply scheme under Bardhaman-I Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman ASSISTANT ENGINEER Junior Engineer ORD/000066/2024-2025 2388/CMD 02/08/2024 90 ELECTRICAL & MECHANICAL ENGINEERING CORPORATION 55.95 0.00 0 0
1572 PURBA BARDHAMAN Burdwan-I Central Mechanical JAGADABAD PIPED WATER SUPPLY SCHEME , SM/13945 New NEW SERVICE CONNECTION FOR JAGDABAD PWSS PH-1. BILL/02872/2023-2024 BP-2023-24-609 06/03/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 0.65 0.00 0 0
1573 PURBA BARDHAMAN Burdwan-I Central Mechanical JAGADABAD PIPED WATER SUPPLY SCHEME , SM/13945 New NEW SERVICE CONNECTION FOR JAGDABAD PWSS PH-2. BILL/02873/2023-2024 BP-2023-24-608 06/03/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 10.21 0.00 0 0
1574 PURBA BARDHAMAN Burdwan-I Burdwan Division JAGADABAD PIPED WATER SUPPLY SCHEME , SM/13945 New Different works related (sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of different capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site) to BARASAT, JAGADABAD & KHAIDYA Piped Water Supply Scheme under BURDWAN-I Block, District:- Purba Bardhaman [NEW SCHEME] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. J.E. 1 BURDWAN ORD/000465/2023-2024 3460/BWD 08/08/2023 783 CONCORD EMC ENCLAVE LLP 1,526.24 229.00 15 5
1575 PURBA BARDHAMAN Burdwan-I Burdwan Division JAGADABAD PIPED WATER SUPPLY SCHEME , SM/13945 New Continuation for the work of Supply of one No. Diesel Driven Car (other than Ambasader) on hire basis for the office of the Assistant Engineer, RWS Burdwan Sub- Division, PHE Dte. (Period from 01-11-2025 to 31-12-2025). ASSISTANT ENGINEER R.W.S. BURDWAN SUB-DIVISION PHE DTE ORD/000751/2025-2026 239/RWS 31/10/2025 61 MD HASIN 0.80 0.00 0 0
1576 PURBA BARDHAMAN Burdwan-I Burdwan Division PALITPUR PIPED WATER SUPPLY SCHEME , SM/14076 New Material Requisition To Resource Division RTOR000009/2023-2024 1962/BWD 25/04/2023 0 Resource Division 5.23 0.00 0 0
1577 PURBA BARDHAMAN Burdwan-I Burdwan Division PALITPUR PIPED WATER SUPPLY SCHEME , SM/14076 New Material Requisition To Resource Division RTOR000361/2023-2024 2197/BWD 12/05/2023 0 Resource Division 10.42 0.00 0 0
1578 PURBA BARDHAMAN Burdwan-I Burdwan Division PALITPUR PIPED WATER SUPPLY SCHEME , SM/14076 New Material Requisition To Resource Division RTOR000728/2023-2024 5275/BWD 30/11/2023 0 Resource Division 21.07 0.00 0 0
1579 PURBA BARDHAMAN Burdwan-I Central Mechanical PALITPUR PIPED WATER SUPPLY SCHEME , SM/14076 New New service connection charges for Palitpur PWSS TW-1 BILL/01671/2023-2024 BP-2023-24-228 10/11/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 2.84 0.00 0 0
1580 PURBA BARDHAMAN Burdwan-I Central Mechanical PALITPUR PIPED WATER SUPPLY SCHEME , SM/14076 New New service connection charges for Palitpur PWSS TW-2 BILL/01672/2023-2024 BP-2023-24-229 10/11/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 2.84 0.00 0 0
1581 PURBA BARDHAMAN Burdwan-I Central Mechanical PALITPUR PIPED WATER SUPPLY SCHEME , SM/14076 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at MALKITA & others water supply scheme under Bardhaman-I Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman ASSISTANT ENGINEER Junior Engineer ORD/000066/2024-2025 2388/CMD 02/08/2024 90 ELECTRICAL & MECHANICAL ENGINEERING CORPORATION 55.95 0.00 0 0
1582 PURBA BARDHAMAN Burdwan-I Burdwan Division PALITPUR PIPED WATER SUPPLY SCHEME , SM/14076 New Different works related (sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of different capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site) to KALIGRAM & PALITPUR Piped Water Supply Scheme under Burdwan I Block, District:- Purba Bardhaman [NEW SCHEME] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000499/2023-2024 3532/BWD 10/08/2023 722 SUPRITI ENTERPRISE 704.50 17.68 2.51 50
1583 PURBA BARDHAMAN Burdwan-I Central Mechanical PALITPUR PIPED WATER SUPPLY SCHEME , SM/14076 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at Palitpur Water Supply Scheme [ Block- Burdwan-1 ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER Junior Engineer ORD/000661/2023-2024 4004/CMD 29/08/2023 703 SUBRATA BHADRA 28.96 0.00 0 90
1584 PURBA BARDHAMAN Khandaghosh Burdwan Division AMRA PIPED WATER SUPPLY SCHEME , SM/13454 New Material Requisition To Resource Division RTOR000702/2023-2024 5049/BWD 23/11/2023 0 Resource Division 20.46 0.00 0 0
1585 PURBA BARDHAMAN Khandaghosh Burdwan Division AMRA PIPED WATER SUPPLY SCHEME , SM/13454 New Material Requisition To Resource Division RTOR000194/2023-2024 2155/BWD 10/05/2023 0 Resource Division 15.41 0.00 0 0
1586 PURBA BARDHAMAN Khandaghosh Central Mechanical AMRA PIPED WATER SUPPLY SCHEME , SM/13454 New New service connection charges for Amra PWSS TW-1 BILL/01474/2023-2024 BP-2023-24-172 29/09/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.84 0.00 0 0
1587 PURBA BARDHAMAN Khandaghosh Central Mechanical AMRA PIPED WATER SUPPLY SCHEME , SM/13454 New New service connection charges for Amra PWSS TW-2 BILL/01475/2023-2024 BP-2023-24-173 29/09/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 6.42 0.00 0 0
1588 PURBA BARDHAMAN Khandaghosh Central Mechanical AMRA PIPED WATER SUPPLY SCHEME , SM/13454 New Supply & fitting fixing of FASD motor starter (for urgent FHTC) for Tube well no.-I & II at Amra water supply scheme, (Block- Khandaghosh) under CMD, PHE Dte., Dist.- Purba-Bardhaman ASSISTANT ENGINEER Junior Engineer ORD/000268/2024-2025 743/CMSD 13/05/2024 10 M/S. SWAPAN BANERJEE 0.60 0.60 100 100
1589 PURBA BARDHAMAN Khandaghosh Burdwan Division AMRA PIPED WATER SUPPLY SCHEME , SM/13454 New Different works related (sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of different capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site) to AMRA, BALABATI, UKHRID & RUPSA Piped Water Supply Scheme under KHANDAGHOSH Block, District:- Purba Bardhaman [NEW SCHEME] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer1, Durgapur Sub-Division, PHE Dte.,Junior Engineer2, Durgapur Sub-Division, PHE Dte. ORD/000008/2023-2024 1726/BWD 13/04/2023 902 S.P. CONSTRUCTION 1,710.27 305.15 17.84 45
1590 PURBA BARDHAMAN Khandaghosh Burdwan Division AMRA PIPED WATER SUPPLY SCHEME , SM/13454 New Surveying, planning, design, drawing and construction of pipe carrying structural bridge for carrying 200 mm. dia. D.I. Pipe line at AMRA Piped W/S. Scheme, Khandaghosh Dev. Block under Durgapur (Burdwan North) Sub-Division, PHE. Dte. within Burdwan Division, PHE. Dte. Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer1, Durgapur Sub-Division, PHE Dte. ORD/000831/2024-2025 4085/BWD 22/11/2024 361 S.P. CONSTRUCTION 149.75 0.00 0 25
1591 PURBA BARDHAMAN Khandaghosh Central Mechanical AMRA PIPED WATER SUPPLY SCHEME , SM/13454 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at KHEJURHATI & others water supply scheme under Khandoghosh Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman ASSISTANT ENGINEER Junior Engineer ORD/000071/2024-2025 2391/CMD 02/08/2024 90 C.M. ENTERPRISE 45.81 0.00 0 10
1592 PURBA BARDHAMAN Khandaghosh Burdwan Division AMRA PIPED WATER SUPPLY SCHEME , SM/13454 New Balance work for providing Functional Household Tap Connection (FHTC) within the command area BALABATI, AMRA & RUPSA W/S. Scheme of Khandaghosh Block under Burdwan Division, PHE. Dte. Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer1, Durgapur Sub-Division, PHE Dte. ORD/001189/2024-2025 609/BWD 11/02/2025 120 M/S S.S. ENTERPRISE 194.58 0.00 0 0
1593 PURBA BARDHAMAN Ketugram-II Burdwan Division PURULIA PIPED WATER SUPPLY SCHEME , SM/15239 New Material Requisition To Resource Division RTOR000162/2023-2024 2155/BWD 10/05/2023 0 Resource Division 15.02 0.00 0 0
1594 PURBA BARDHAMAN Ketugram-II Burdwan Division PURULIA PIPED WATER SUPPLY SCHEME , SM/15239 New Material Requisition To Resource Division RTOR000490/2023-2024 4014/BWD 08/09/2023 0 Resource Division 8.73 0.00 0 0
1595 PURBA BARDHAMAN Ketugram-II Burdwan Division PURULIA PIPED WATER SUPPLY SCHEME , SM/15239 New Material Requisition To Resource Division RTOR000597/2023-2024 4891/BWD 10/11/2023 0 Resource Division 10.00 0.00 0 0
1596 PURBA BARDHAMAN Ketugram-II Central Mechanical PURULIA PIPED WATER SUPPLY SCHEME , SM/15239 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Kankurhati & others water supply scheme under Ketugram-2 Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. Driller In-Charge Junior Engineer ORD/000103/2024-2025 2408/CMD 02/08/2024 90 DIPALI CONSTRUCTION 41.95 0.00 0 0
1597 PURBA BARDHAMAN Ketugram-II Central Mechanical PURULIA PIPED WATER SUPPLY SCHEME , SM/15239 New New service connection at Purulia PWSS TW No.1 BILL/02377/2023-2024 BP-2023-24-492 01/02/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.09 0.00 0 0
1598 PURBA BARDHAMAN Ketugram-II Central Mechanical PURULIA PIPED WATER SUPPLY SCHEME , SM/15239 New NEW SERVICE CONNECTION FOR PURULIA PWSS TW 2. BILL/03136/2023-2024 BP-2023-24-650 20/03/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.36 0.00 0 0
1599 PURBA BARDHAMAN Ketugram-II Burdwan Division PURULIA PIPED WATER SUPPLY SCHEME , SM/15239 New Different works related (sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of different capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site) to BILLESWAR, GURPARA & PURULIA Piped Water Supply Scheme under KETUGRAM-II Block, District:- Purba Bardhaman [NEW SCHEME] Assistant Engineer JUNIOR ENGINEER KATWA SUB-DIVISION PHE DTE,JUNIOR ENGINEER R.W.S. BURDWAN SUB-DIVISION PHE DTE ORD/000038/2023-2024 1821/BWD 18/04/2023 897 PASCON 1,118.33 147.75 13.21 46
1600 PURBA BARDHAMAN Ketugram-II Central Mechanical PURULIA PIPED WATER SUPPLY SCHEME , SM/15239 New Supply & Installation of Submersible Pumping Machinery , Voltage Stabilizer, Chlorination System and Internal House wiring for Tube well no.- 1 & 2 at PURULIA Water Supply Scheme [Block - KETUGRAM-2] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER,Driller In-Charge Junior Engineer ORD/000823/2023-2024 4100/CMD 29/08/2023 665 BARMAN ROY TRADERS 21.01 7.97 37.93 43
1601 PURBA BARDHAMAN Ketugram-II Burdwan Division PURULIA PIPED WATER SUPPLY SCHEME , SM/15239 New Balance work of OHR, construction Concrete Road, Drum Sheet Pilling, Functional Household Tap Connection, construction of HUME Pipe culvert, land development, Road restoration etc. under Billeswar PWSS, Purulia PWSS & Gurpara PWSS under KATWA -II Block under Katwa Sub-Divn. under Burdwan Division, PHED. District:- Purba-Bardhaman Assistant Engineer JUNIOR ENGINEER KATWA SUB-DIVISION PHE DTE ORD/000310/2024-2025 2834/BWD 19/07/2024 467 PASCON 190.06 0.00 0 90
1602 PURBA BARDHAMAN Ketugram-II Central Mechanical PURULIA PIPED WATER SUPPLY SCHEME , SM/15239 New Increasing of tube well casing and other works at PURULIA PWSS under CMD, PHE Dte., Dist.- Purba-Bardhaman. Driller In-Charge JUNIOR ENGINEER ORD/001580/2024-2025 151/DIC/BMSD(D) 04/03/2025 7 BARMAN ROY TRADERS 0.29 0.00 0 100
1603 PURBA BARDHAMAN Ketugram-II Central Mechanical PURULIA PIPED WATER SUPPLY SCHEME , SM/15239 New Supply and delivery of 7.5 HP pump motor set at T.W. No - 2 of PURULIA (Block- Ketugram-II) water supply scheme under CMD, PHE Dte. Driller In-Charge JUNIOR ENGINEER ORD/000733/2024-2025 821/DIC/BMSD(D) 05/12/2024 33 BARMAN ROY TRADERS 0.67 0.00 0 100
1604 PURBA BARDHAMAN Ketugram-II Central Mechanical PURULIA PIPED WATER SUPPLY SCHEME , SM/15239 New Supply and delivery of 7.5 HP pump motor set at T.W. No - 1 of PURULIA (Block-Ketugram-II) water supply scheme under CMD, PHE Dte. Driller In-Charge JUNIOR ENGINEER ORD/001583/2024-2025 159/DIC/BMSD(D) 06/03/2025 7 BARMAN ROY TRADERS 0.67 0.00 0 100
1605 PURBA BARDHAMAN Ketugram-II Burdwan Division BILLESWAR PIPED WATER SUPPLY SCHEME , SM/15241 New Material Requisition To Resource Division RTOR000062/2023-2024 1962/BWD 25/04/2023 0 Resource Division 0.83 0.00 0 0
1606 PURBA BARDHAMAN Ketugram-II Burdwan Division BILLESWAR PIPED WATER SUPPLY SCHEME , SM/15241 New Material Requisition To Resource Division RTOR000153/2023-2024 2155/BWD 10/05/2023 0 Resource Division 11.05 0.00 0 0
1607 PURBA BARDHAMAN Ketugram-II Burdwan Division BILLESWAR PIPED WATER SUPPLY SCHEME , SM/15241 New Material Requisition To Resource Division RTOR000624/2023-2024 4870/BWD 10/11/2023 0 Resource Division 29.60 0.00 0 0
1608 PURBA BARDHAMAN Ketugram-II Central Mechanical BILLESWAR PIPED WATER SUPPLY SCHEME , SM/15241 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at BILLESWAR Water Supply Scheme [ Block- KETUGRAM-2] under CMD, PHE Dte., Dist.- Purba-Bardhaman. Driller In-Charge Junior Engineer ORD/000779/2023-2024 4073/CMD 29/08/2023 30 KAMAKHYA ENTERPRISE 26.97 21.21 78.64 88
1609 PURBA BARDHAMAN Ketugram-II Central Mechanical BILLESWAR PIPED WATER SUPPLY SCHEME , SM/15241 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Kankurhati & others water supply scheme under Ketugram-2 Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. Driller In-Charge Junior Engineer ORD/000103/2024-2025 2408/CMD 02/08/2024 90 DIPALI CONSTRUCTION 41.95 0.00 0 0
1610 PURBA BARDHAMAN Ketugram-II Central Mechanical BILLESWAR PIPED WATER SUPPLY SCHEME , SM/15241 New New service connection at Billeswar PWSS TW No.1 BILL/02374/2023-2024 BP-2023-24-493 01/02/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.28 0.00 0 0
1611 PURBA BARDHAMAN Ketugram-II Central Mechanical BILLESWAR PIPED WATER SUPPLY SCHEME , SM/15241 New New Service connection for Billwswar PWSS TW-2 BILL/02350/2023-2024 BP-2023-24-466 31/01/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.04 0.00 0 0
1612 PURBA BARDHAMAN Ketugram-II Burdwan Division BILLESWAR PIPED WATER SUPPLY SCHEME , SM/15241 New Different works related (sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of different capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site) to BILLESWAR, GURPARA & PURULIA Piped Water Supply Scheme under KETUGRAM-II Block, District:- Purba Bardhaman [NEW SCHEME] Assistant Engineer JUNIOR ENGINEER KATWA SUB-DIVISION PHE DTE,JUNIOR ENGINEER R.W.S. BURDWAN SUB-DIVISION PHE DTE ORD/000038/2023-2024 1821/BWD 18/04/2023 897 PASCON 1,118.33 235.44 21.05 46
1613 PURBA BARDHAMAN Ketugram-II Burdwan Division BILLESWAR PIPED WATER SUPPLY SCHEME , SM/15241 New Balance work of OHR, construction Concrete Road, Drum Sheet Pilling, Functional Household Tap Connection, construction of HUME Pipe culvert, land development, Road restoration etc. under Billeswar PWSS, Purulia PWSS & Gurpara PWSS under KATWA -II Block under Katwa Sub-Divn. under Burdwan Division, PHED. District:- Purba-Bardhaman Assistant Engineer JUNIOR ENGINEER KATWA SUB-DIVISION PHE DTE ORD/000310/2024-2025 2834/BWD 19/07/2024 467 PASCON 190.06 0.00 0 90
1614 PURBA BARDHAMAN Raina-I Central Mechanical UDGARA PIPED WATER SUPPLY SCHEME , SM/14961 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at Udgara Water Supply Scheme [ Block- Raina-1 ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000712/2023-2024 4023/CMD 29/08/2023 30 CHATTERJEE ENTERPRISE 28.95 0.00 0 0
1615 PURBA BARDHAMAN Raina-I Burdwan Division UDGARA PIPED WATER SUPPLY SCHEME , SM/14961 New Material Requisition To Resource Division RTOR000207/2023-2024 2155/BWD 10/05/2023 0 Resource Division 9.24 0.00 0 0
1616 PURBA BARDHAMAN Raina-I Burdwan Division UDGARA PIPED WATER SUPPLY SCHEME , SM/14961 New Material Requisition To Resource Division RTOR000535/2023-2024 4287/BWD 29/09/2023 0 Resource Division 4.57 0.00 0 0
1617 PURBA BARDHAMAN Raina-I Burdwan Division UDGARA PIPED WATER SUPPLY SCHEME , SM/14961 New Material Requisition To Resource Division RTOR000699/2023-2024 5069/BWD 23/11/2023 0 Resource Division 20.46 0.00 0 0
1618 PURBA BARDHAMAN Raina-I Burdwan Division UDGARA PIPED WATER SUPPLY SCHEME , SM/14961 New Different works related (sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of different capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site) to BHAGABATIPUR, MACHKHARA & UDGARA Piped Water Supply Scheme under Raina ¿ I Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000690/2023-2024 4386/BWD 05/10/2023 365 SK ALIM 1,378.97 77.61 5.63 55
1619 PURBA BARDHAMAN Raina-I Central Mechanical UDGARA PIPED WATER SUPPLY SCHEME , SM/14961 New New Service connection for Udgra W/S Scheme PH No.-I BILL/01799/2023-2024 BP-2023-24-310 30/12/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.13 0.00 0 0
1620 PURBA BARDHAMAN Raina-I Central Mechanical UDGARA PIPED WATER SUPPLY SCHEME , SM/14961 New New Service connection for Udgram W/S Scheme PH No.-II BILL/01798/2023-2024 BP-2023-24-311 30/12/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.73 0.00 0 0
1621 PURBA BARDHAMAN Raina-I Central Mechanical UDGARA PIPED WATER SUPPLY SCHEME , SM/14961 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Bajitpur, Belsar & other water supply scheme under Raina-1 Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000117/2024-2025 2589/CMD 27/08/2024 90 DEY ENTERPRISE 74.58 0.00 0 10
1622 PURBA BARDHAMAN Raina-I Burdwan Division UDGARA PIPED WATER SUPPLY SCHEME , SM/14961 New Balance work [i.e. Extension or parallel Pipeline, Leftout FHTC, Road Restoration work, Sinking of Additional Tube Well with Pump House & Boundary wall, inter Connection of Additional Tube Well, Construction of M.S.Structural bridge, canal Crossing, MS casing with allied work of Bhagabatipur, Machkhara, Udgara, Bantir, Chakpurohit Rasuikhanda, Sankarpur, Gopalpur & Belshar PWSS Block-RAINA- I under Burdwan Sub Division, PHE Dte. within Burdwan Division PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/001103/2024-2025 469/BWD 24/01/2025 366 SK ALIM 1,353.91 0.00 0 25
1623 PURBA BARDHAMAN Raina-I Burdwan Division UDGARA PIPED WATER SUPPLY SCHEME , SM/14961 New Continuation Work Order for supply of inspection Vehicle for inspection of different JJM related (schemes)works as and when required including supply of driver & fuel(minimum 8 hours duty per day) and all taxes etc. for Burdwan Sub-Division under Burdwan Division,PHE Dte consider 96.00 Km. run per day (Period from 01-11-2024 to 31-01-2025) Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000896/2024-2025 2438/BSD 29/10/2024 66 PARVIN BEGAM 0.85 0.28 32.94 100
1624 PURBA BARDHAMAN Raina-I Burdwan Division UDGARA PIPED WATER SUPPLY SCHEME , SM/14961 New Continuation Work Order for supply of inspection Vehicle No. WB42Y- 7403 for inspection of different JJM related (schemes) works as and when required including supply of driver & fuel(minimum 8 hours duty per day) and all taxes etc. for Burdwan Sub Division under Burdwan Division, PHE Dte consider 96.00 Km. run per day (Period from 01-05-2025 to 31-07-2025) JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000181/2025-2026 960/BSD 30/04/2025 66 PARVIN BEGAM 0.85 0.00 0 100
1625 PURBA BARDHAMAN Bhatar Burdwan Division BAZAR MAHAMMADPUR PIPED WATER SUPPLY SCHEME , SM/14962 New Material Requisition To Resource Division RTOR000064/2023-2024 1962/BWD 25/04/2023 0 Resource Division 32.63 0.00 0 0
1626 PURBA BARDHAMAN Bhatar Burdwan Division BAZAR MAHAMMADPUR PIPED WATER SUPPLY SCHEME , SM/14962 New Material Requisition To Resource Division RTOR000172/2023-2024 2155/BWD 10/05/2023 0 Resource Division 4.84 0.00 0 0
1627 PURBA BARDHAMAN Bhatar Burdwan Division BAZAR MAHAMMADPUR PIPED WATER SUPPLY SCHEME , SM/14962 New Material Requisition To Resource Division RTOR000601/2023-2024 4907/BWD 10/11/2023 0 Resource Division 33.07 0.00 0 0
1628 PURBA BARDHAMAN Bhatar Central Mechanical BAZAR MAHAMMADPUR PIPED WATER SUPPLY SCHEME , SM/14962 New New service connection charges for Bazar Mahammadpur PWSS TW-1 BILL/00883/2023-2024 BP-2023-24-109 09/08/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.85 0.00 0 0
1629 PURBA BARDHAMAN Bhatar Central Mechanical BAZAR MAHAMMADPUR PIPED WATER SUPPLY SCHEME , SM/14962 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at BAZAR MAHAMMADPUR Water Supply Scheme [ Block- BHATAR] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000235/2023-2024 3171/CMD 26/07/2023 30 SUNRISE ENGINEERING CORPORATION 27.78 5.62 20.23 95
1630 PURBA BARDHAMAN Bhatar Central Mechanical BAZAR MAHAMMADPUR PIPED WATER SUPPLY SCHEME , SM/14962 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Karjana & others water supply scheme under Bhatar Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000067/2024-2025 2394/CMD 02/08/2024 90 AHALYA ENGINEERING WORKS 82.00 0.00 0 0
1631 PURBA BARDHAMAN Bhatar Central Mechanical BAZAR MAHAMMADPUR PIPED WATER SUPPLY SCHEME , SM/14962 New New service connection charges for Bazar Mohammadpur PWSS TW-2 BILL/01734/2023-2024 BP-2023-24-250 07/12/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 4.98 0.00 0 0
1632 PURBA BARDHAMAN Bhatar Burdwan Division BAZAR MAHAMMADPUR PIPED WATER SUPPLY SCHEME , SM/14962 New BAZAR MAHAMMADPUR Piped Water Supply Scheme with sinking of Tube-well, LDS, Rising Main, FHTC, Construction of 400 cum capacity RCC OHR with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drain and internal pathway at different TW site under Bhatar Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer2, Durgapur Sub-Division, PHE Dte. ORD/000801/2022-2023 1529/BWD 29/03/2023 659 ASHOK MITRA 537.95 469.55 87.29 100
1633 PURBA BARDHAMAN Bhatar Central Mechanical BAZAR MAHAMMADPUR PIPED WATER SUPPLY SCHEME , SM/14962 New Supply and installation of Electro-Magnetic flow meter at Bazar Mahammadpur, Dhatrigram, Arjunpukur & others water supply scheme under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000590/2024-2025 3105/CMD 11/12/2024 60 SHREE BISHNU CONSTRUCTION 19.77 0.00 0 0
1634 PURBA BARDHAMAN Purbasthali-I Burdwan Division BHANDARITURI PIPED WATER SUPPLY SCHEME , SM/14925 New Material Requisition To Resource Division RTOR000142/2023-2024 2155/BWD 10/05/2023 0 Resource Division 15.82 0.00 0 0
1635 PURBA BARDHAMAN Purbasthali-I Burdwan Division BHANDARITURI PIPED WATER SUPPLY SCHEME , SM/14925 New Material Requisition To Resource Division RTOR000416/2023-2024 3866/BWD 01/09/2023 0 Resource Division 0.23 0.00 0 0
1636 PURBA BARDHAMAN Purbasthali-I Central Mechanical BHANDARITURI PIPED WATER SUPPLY SCHEME , SM/14925 New New service connection charges for Bhandarituri PWSS TW-1 BILL/01535/2023-2024 BP-2023-24-202 18/10/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 5.82 0.00 0 0
1637 PURBA BARDHAMAN Purbasthali-I Central Mechanical BHANDARITURI PIPED WATER SUPPLY SCHEME , SM/14925 New Supply & Installation of Submersible Pumping Machinery , Voltage Stabilizer, Chlorination System and Internal House wiring for Tube well no.- 1 & 2 at BHANDARITURI Water Supply Scheme [Block - PURBASTHALI-1] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000816/2023-2024 4096/CMD 29/08/2023 30 KAMAKHYA ENTERPRISE 20.75 9.49 45.73 60
1638 PURBA BARDHAMAN Purbasthali-I Burdwan Division BHANDARITURI PIPED WATER SUPPLY SCHEME , SM/14925 New BHANDARTIKURI Piped Water Supply Scheme with sinking of Tube-well, LDS, Rising Main, FHTC, with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drain and internal pathway at different TW site under Purbasthali-I Block, District:- Purba-Bardhaman [NEW SCHEME]. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000758/2022-2023 1280/BWD 20/03/2023 90 NANDANIK ENGINEERS CO-OPERATIVE SOCIETY LTD. 65.35 60.38 92.39 100
1639 PURBA BARDHAMAN Purbasthali-I Burdwan Division BHANDARITURI PIPED WATER SUPPLY SCHEME , SM/14925 New Material Requisition To Resource Division RTOR000797/2023-2024 312/BWD 24/01/2024 0 Resource Division 7.05 0.00 0 0
1640 PURBA BARDHAMAN Purbasthali-I Burdwan Division BHANDARITURI PIPED WATER SUPPLY SCHEME , SM/14925 New Different types of works involve in connection with Augmentation of DIRGHAPARA (SM/07804) Water Supply Scheme, MOUDANGA (SM/ 14020) Water supply Scheme & BHANDARTIKURI (SM/14925) Water Supply Scheme under Burdwan Division, PHE Dte. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000357/2024-2025 2912/BWD 25/07/2024 431 BANSBERIA CONSTRUCTION CO. 293.38 0.00 0 22
1641 PURBA BARDHAMAN Purbasthali-I Central Mechanical BHANDARITURI PIPED WATER SUPPLY SCHEME , SM/14925 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Haripur & others water supply scheme under purbasthali 1 Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000072/2024-2025 2397/CMD 02/08/2024 90 CHATTERJEE ENTERPRISE 48.60 0.00 0 30
1642 PURBA BARDHAMAN Burdwan-II Burdwan Division BAMCHANDRAPUR PIPED WATER SUPPLY SCHEME , SM/14965 New Material Requisition To Resource Division RTOR000226/2023-2024 2155/BWD 10/05/2023 0 Resource Division 4.92 0.00 0 0
1643 PURBA BARDHAMAN Burdwan-II Burdwan Division BAMCHANDRAPUR PIPED WATER SUPPLY SCHEME , SM/14965 New Material Requisition To Resource Division RTOR000496/2023-2024 4020/BWD 08/09/2023 0 Resource Division 0.41 0.00 0 0
1644 PURBA BARDHAMAN Burdwan-II Burdwan Division BAMCHANDRAPUR PIPED WATER SUPPLY SCHEME , SM/14965 New Material Requisition To Resource Division RTOR000651/2023-2024 5113/BWD 23/11/2023 0 Resource Division 20.46 0.00 0 0
1645 PURBA BARDHAMAN Burdwan-II Central Mechanical BAMCHANDRAPUR PIPED WATER SUPPLY SCHEME , SM/14965 New New Service connection for Bamchandrapur PWSS TW-2. BILL/02893/2023-2024 BP-2023-24-626 07/03/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 6.71 0.00 0 0
1646 PURBA BARDHAMAN Burdwan-II Central Mechanical BAMCHANDRAPUR PIPED WATER SUPPLY SCHEME , SM/14965 New New Service connection for Bamchandrapur PWSS TW-1. BILL/02894/2023-2024 BP-2023-24-627 07/03/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 4.75 0.00 0 0
1647 PURBA BARDHAMAN Burdwan-II Burdwan Division BAMCHANDRAPUR PIPED WATER SUPPLY SCHEME , SM/14965 New BAMCHANDRAPUR Piped Water Supply Scheme with sinking of Tube-well, LDS, Construction of 150 cum RCC OHR with 20 mtr. staging height including soil testing, Rising Main, FHTC & construction of switch rooms & boundary walls with gates and land development, drain and internal pathway at different TW site under Burdwan-II Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. Junior Engineer, Burdwan Sadar Sub-Division ORD/000196/2023-2024 2701/BWD 08/06/2023 847 M/S PROCHESTA ENTERPRISE 254.91 70.20 27.54 60
1648 PURBA BARDHAMAN Burdwan-II Central Mechanical BAMCHANDRAPUR PIPED WATER SUPPLY SCHEME , SM/14965 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at Bamchandrapur Water Supply Scheme [ Block- Burdwan-2 ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER Junior Engineer ORD/000734/2023-2024 4044/CMD 29/08/2023 30 S.K. ENTERPRISE 30.08 0.00 0 90
1649 PURBA BARDHAMAN Burdwan-II Central Mechanical BAMCHANDRAPUR PIPED WATER SUPPLY SCHEME , SM/14965 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at KUSHA & others water supply scheme under Bardhaman-II Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman ASSISTANT ENGINEER Junior Engineer ORD/000065/2024-2025 2389/CMD 02/08/2024 90 DILIP MAHATO 53.14 0.00 0 12
1650 PURBA BARDHAMAN Khandaghosh,Raina-I Burdwan Division MACHKHARA PIPED WATER SUPPLY SCHEME , SM/14967 New Material Requisition To Resource Division RTOR000335/2023-2024 2197/BWD 12/05/2023 0 Resource Division 13.92 0.00 0 0
1651 PURBA BARDHAMAN Khandaghosh,Raina-I Burdwan Division MACHKHARA PIPED WATER SUPPLY SCHEME , SM/14967 New Material Requisition To Resource Division RTOR000536/2023-2024 4296/BWD 29/09/2023 0 Resource Division 5.11 0.00 0 0
1652 PURBA BARDHAMAN Khandaghosh,Raina-I Burdwan Division MACHKHARA PIPED WATER SUPPLY SCHEME , SM/14967 New Material Requisition To Resource Division RTOR000675/2023-2024 5063/BWD 23/11/2023 0 Resource Division 20.46 0.00 0 0
1653 PURBA BARDHAMAN Khandaghosh,Raina-I Burdwan Division MACHKHARA PIPED WATER SUPPLY SCHEME , SM/14967 New Different works related (sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of different capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site) to BHAGABATIPUR, MACHKHARA & UDGARA Piped Water Supply Scheme under Raina ¿ I Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000690/2023-2024 4386/BWD 05/10/2023 365 SK ALIM 1,378.97 267.86 19.42 55
1654 PURBA BARDHAMAN Khandaghosh,Raina-I Central Mechanical MACHKHARA PIPED WATER SUPPLY SCHEME , SM/14967 New New service connection for Machkhanda PWSS. BILL/02247/2023-2024 BP-2023-24-399 17/01/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 5.37 0.00 0 0
1655 PURBA BARDHAMAN Khandaghosh,Raina-I Central Mechanical MACHKHARA PIPED WATER SUPPLY SCHEME , SM/14967 New New service connection for Mackhara PWSS TW-2. BILL/02280/2023-2024 BP-2023-24-434 29/01/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 4.50 0.00 0 0
1656 PURBA BARDHAMAN Khandaghosh,Raina-I Central Mechanical MACHKHARA PIPED WATER SUPPLY SCHEME , SM/14967 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Bajitpur, Belsar & other water supply scheme under Raina-1 Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000117/2024-2025 2589/CMD 27/08/2024 90 DEY ENTERPRISE 74.58 0.00 0 10
1657 PURBA BARDHAMAN Khandaghosh,Raina-I Burdwan Division MACHKHARA PIPED WATER SUPPLY SCHEME , SM/14967 New Balance work [i.e. Extension or parallel Pipeline, Leftout FHTC, Road Restoration work, Sinking of Additional Tube Well with Pump House & Boundary wall, inter Connection of Additional Tube Well, Construction of M.S.Structural bridge, canal Crossing, MS casing with allied work of Bhagabatipur, Machkhara, Udgara, Bantir, Chakpurohit Rasuikhanda, Sankarpur, Gopalpur & Belshar PWSS Block-RAINA- I under Burdwan Sub Division, PHE Dte. within Burdwan Division PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/001103/2024-2025 469/BWD 24/01/2025 366 SK ALIM 1,353.91 0.00 0 25
1658 PURBA BARDHAMAN Mangolkote Burdwan Division KHARIJA KASHIGRAM PIPED WATER SUPPLY SCHEME , SM/14916 New Material Requisition To Resource Division RTOR000111/2023-2024 1965/BWD 26/04/2023 0 Resource Division 2.74 0.00 0 0
1659 PURBA BARDHAMAN Mangolkote Burdwan Division KHARIJA KASHIGRAM PIPED WATER SUPPLY SCHEME , SM/14916 New Material Requisition To Resource Division RTOR000383/2023-2024 2197/BWD 12/05/2023 0 Resource Division 22.26 0.00 0 0
1660 PURBA BARDHAMAN Mangolkote Central Mechanical KHARIJA KASHIGRAM PIPED WATER SUPPLY SCHEME , SM/14916 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Jabagram & others water supply scheme under Mangalkote Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. Driller In-Charge Junior Engineer ORD/000118/2024-2025 2590/CMD 27/08/2024 90 M/S SAJAHAN CHOWDHURY 62.06 0.00 0 0
1661 PURBA BARDHAMAN Mangolkote Burdwan Division KHARIJA KASHIGRAM PIPED WATER SUPPLY SCHEME , SM/14916 New Supply of 1 (one) No. Inspection Vehicle for different JJM Related Works as and when required including supply of driver and fuels (Minimum 8 Hours of duty) under Katwa Sub-Division within Burdwan Division, P.H.E. Dte. Consider 96.00 Km run per Day. Assistant Engineer JUNIOR ENGINEER KATWA SUB-DIVISION PHE DTE ORD/001080/2023-2024 22/KTS 05/01/2024 70 AJIT SAMANTA 0.90 0.30 33.33 100
1662 PURBA BARDHAMAN Mangolkote Burdwan Division KHARIJA KASHIGRAM PIPED WATER SUPPLY SCHEME , SM/14916 New Material Requisition To Resource Division RTOR000811/2023-2024 301/BWD 24/01/2024 0 Resource Division 20.47 0.00 0 0
1663 PURBA BARDHAMAN Mangolkote Central Mechanical KHARIJA KASHIGRAM PIPED WATER SUPPLY SCHEME , SM/14916 New New service connection charges for Kharija Kashigram PWSS TW-1 BILL/01770/2023-2024 BP-2023-24-275 21/12/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 7.81 0.00 0 0
1664 PURBA BARDHAMAN Mangolkote Central Mechanical KHARIJA KASHIGRAM PIPED WATER SUPPLY SCHEME , SM/14916 New NEW SERVICE CONNECTION FOR KHARIJA KASHIGRAM PWSS PH-2 BILL/00192/2024-2025 BP-2024-25-91 17/05/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 4.45 0.00 0 0
1665 PURBA BARDHAMAN Mangolkote Burdwan Division KHARIJA KASHIGRAM PIPED WATER SUPPLY SCHEME , SM/14916 New Different works related (sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of different capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site) to DEULIA, GOBARDHANPUR, KHARIJA-KASHIGRAM & UNIATATARPUR Piped Water Supply Scheme under Mangolkote Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer JUNIOR ENGINEER KATWA SUB-DIVISION PHE DTE ORD/000477/2023-2024 3491/BWD 09/08/2023 815 POWER TOOLS & ENGINEERING 1,741.05 62.69 3.6 10
1666 PURBA BARDHAMAN Mangolkote Central Mechanical KHARIJA KASHIGRAM PIPED WATER SUPPLY SCHEME , SM/14916 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at KHARIJA KASHIGRAM Water Supply Scheme [ Block-MONGOLKOTE ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. Driller In-Charge Junior Engineer ORD/000778/2023-2024 4072/CMD 29/08/2023 640 SOUNAK ENTERPRISE 27.79 10.81 38.9 48
1667 PURBA BARDHAMAN Mangolkote Burdwan Division KHARIJA KASHIGRAM PIPED WATER SUPPLY SCHEME , SM/14916 New Continuation work order for Supply of 1 (one) No. Diesel driven Ambassador Car (Luxury Taxi) / Motor Cab on hire basis for the Office of the Assistant Engineer, under Katwa Sub-Division within Burdwan Division, P.H.E. Dte. [Period from 01.07.2025 to 31.12.2025]. Assistant Engineer JUNIOR ENGINEER KATWA SUB-DIVISION PHE DTE ORD/000319/2025-2026 1595/KTS 30/06/2025 184 KRISHNA MONDAL 2.40 0.00 0 33
1668 PURBA BARDHAMAN Burdwan Division Augmentation of Ganganandapur PWSS for providing FHTC. , SM/09411 Augmentation Interconnection of rising main from 2nd Tube Well site and renovation of boundary wall and pump house at 2nd Tube Well Site of Ganganandapur W/S Scheme within Kalna Sub-Division under Burdwan Division , PHE Dte. (Sl No-C) Assistant Engineer ORD/000449/2021-2022 88/KSD 21/01/2022 30 ER CONSTRUCTION & GENERAL ORDER SUPPLIER 1.20 0.86 71.67 1
1669 PURBA BARDHAMAN Burdwan Division Augmentation of Ganganandapur PWSS for providing FHTC. , SM/09411 Augmentation Preparation of DPR for augmentation of Ganganandapur W/S Scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. (Sl No-E) Assistant Engineer ORD/000571/2021-2022 207/KSD 23/02/2022 21 ROY CHOWDHURY ASSOCIATES 2.84 2.82 99.3 1
1670 PURBA BARDHAMAN Burdwan Division Augmentation of Ganganandapur PWSS for providing FHTC. , SM/09411 Augmentation Supply of materials for different water supply scheme under Burdwan Division, PHE Dte. VCH/001578/2021-2022 1207/DW 10/03/2022 0 EXECUTIVE ENGINEER, RESOURCES DIVISION, P.H.E. DTE. 3,005.00 0.00 0 0
1671 PURBA BARDHAMAN Burdwan Division Augmentation of Ganganandapur PWSS for providing FHTC. , SM/09411 Augmentation Sinking of additional 250 X 150mm dia Tube Well 150 mtr. Depth by D.R. Rig method using UPVC pipe (CD) and UPVC Deep Well Screen (RDS) for GANGANANDAPUR Piped Water Supply Scheme, Block - Purbasthali - I, Dist - Purba Bardhaman under Burdwan Division, PHE Dte. Assistant Engineer ORD/000070/2022-2023 2424/BWD 11/05/2022 30 M/S SYCHROTECH INDUSTRY 9.01 8.47 94.01 0
1672 PURBA BARDHAMAN Burdwan Division Augmentation of Ganganandapur PWSS for providing FHTC. , SM/09411 Augmentation Construction of Pump House cum switch room (5.40 mtr x 3.60 mtr) with sanitary arrangement (as per drawing no. PHE/SE/CC/PH/DWG-01/2022-2023) at GANGANANDAPUR Water Supply Scheme within Kalna Sub-Divn. under Burdwan Division, PHE Dte. Dist.-Purba Bardhaman. ORD/000708/2023-2024 4481/BWD 11/10/2023 60 LOKNATH ENTERPRISE 6.31 0.00 0 0
1673 PURBA BARDHAMAN Burdwan Division Augmentation of Ganganandapur PWSS for providing FHTC. , SM/09411 Augmentation Supply and delivery of different dia. CIDF sluice valve for Augmentation of Jahannagar, Ganganandapur, Nowapara & Monteswar Piped Water Supply Scheme within Kalna Sub-Division under Burdwan Division, P.H.E. Dte.[Part ¿ A] Assistant Engineer ORD/000323/2022-2023 3632/BWD 22/08/2022 20 RAMASISH ENTERPRISE 12.80 3.20 25 1
1674 PURBA BARDHAMAN Burdwan Division Augmentation of Ganganandapur PWSS for providing FHTC. , SM/09411 Augmentation Material Requisition To Resource Division RTOR000081/2021-2022 603/BWD 28/01/2022 0 Resource Division 24.12 0.00 0 0
1675 PURBA BARDHAMAN Burdwan Division Augmentation of Ganganandapur PWSS for providing FHTC. , SM/09411 Augmentation Material Requisition To Resource Division RTOR000036/2021-2022 553/BWD 27/01/2022 0 Resource Division 18.08 0.00 0 0
1676 PURBA BARDHAMAN Burdwan Division Augmentation of Ganganandapur PWSS for providing FHTC. , SM/09411 Augmentation Material Requisition To Resource Division RTOR000201/2021-2022 1524/BWD 15/03/2022 0 Resource Division 0.37 0.00 0 0
1677 PURBA BARDHAMAN Burdwan Division Augmentation of Ganganandapur PWSS for providing FHTC. , SM/09411 Augmentation Material Requisition To Resource Division RTOR000105/2021-2022 952/BWD 17/02/2022 0 Resource Division 74.99 0.00 0 0
1678 PURBA BARDHAMAN Burdwan Division Augmentation of Ganganandapur PWSS for providing FHTC. , SM/09411 Augmentation Material Requisition To Resource Division RTOR000042/2022-2023 4626/BWD 17/10/2022 0 Resource Division 18.48 0.00 0 0
1679 PURBA BARDHAMAN Burdwan Division Augmentation of Ganganandapur PWSS for providing FHTC. , SM/09411 Augmentation Quotation from WBSEDCL for new service connection of Ganganandapur w/s scheme. T.W.-3 BILL/00401/2023-2024 537/JJM 21/08/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LTD. 6.60 0.00 0 0
1680 PURBA BARDHAMAN Central Mechanical Augmentation of Ganganandapur PWSS for providing FHTC. , SM/09411 Augmentation Supply & Installation of Submersible Pumping Machinery , Voltage Stabilizer, Chlorination system and internal House wiring for Tube well no.- 1 at Augumentation of Ganganandapur Water Supply Scheme under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000073/2023-2024 2562/CMD 06/06/2023 30 SUDIPTA GHOSH 10.98 10.45 95.17 95
1681 PURBA BARDHAMAN Burdwan Division Augmentation of Ganganandapur PWSS for providing FHTC. , SM/09411 Augmentation Additional works to implement the GANGANANDAPUR Piped Water Supply Scheme under Purbasthali-I Block, Dist :- Purba Bardhaman under Burdwan Division, PHE. Dte. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000707/2022-2023 754/BWD 23/02/2023 60 MANASH GHOSH 76.57 76.42 99.8 85
1682 PURBA BARDHAMAN Burdwan Division Augmentation of Ganganandapur PWSS for providing FHTC. , SM/09411 Augmentation Digital structurization of pipeline alignment and asset evaluation including holistic design, preparation of design drawings of overall LDS & preparation of estimate for 14 Nos. Piped W/S. Schemes under Purbasthali I Block under Kalna Sub-Division under Burdwan Division, PHE. Dte. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000337/2024-2025 3017/BWD 05/08/2024 75 HORIZEN 38.00 16.76 44.11 100
1683 PURBA BARDHAMAN Burdwan Division Augmentation of Ganganandapur PWSS for providing FHTC. , SM/09411 Augmentation Work Order for " Renovation of Pump house along with laboratory building of Ganganandapur piped water supply scheme in connection with Augmentation of Ganganandapur Piped Water Supply Scheme under Burdwan Division, PHE Dte." Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000135/2024-2025 318/KSD 07/06/2024 30 ER CONSTRUCTION & GENERAL ORDER SUPPLIER 4.31 4.24 98.38 100
1684 PURBA BARDHAMAN Burdwan Division Augmentation of Ganganandapur PWSS for providing FHTC. , SM/09411 Augmentation Work Order for "Supervision and extend support to NABL recognised Water Quality Testing Block level Laboratory under The Assistant Engineer, Kalna Sub- Division, Public Health Engineering Directorate, Government of West Bengal by assigining team of competent resource personnel who will be engeged for complete supervision for retaining NABL recognition and compilation of preparatory up-to-date documentation,Calibration for on-site survelliance by NABL (as per NABL 139) for a period of one month from the date of commencement. (Name of SDL : Ganganandapur Sub District Water Testing Laboratory under Kalna Sub Division)". Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE,JUNIOR ENGINEER R.W.S. BURDWAN SUB-DIVISION PHE DTE ORD/000671/2023-2024 1334/KSD 28/08/2023 30 BHARATI CHEMICAL & SCIENTIFIC WORKS 0.51 0.00 0 1
1685 PURBA BARDHAMAN Burdwan Division Augmentation of Ganganandapur PWSS for providing FHTC. , SM/09411 Augmentation Work Order for "Additional work in connection with renovation of Pump house and laboratory building of Ganganandapur piped water supply scheme in connection with Augmentation of Ganganandapur Piped Water Supply Scheme under Burdwan Division, PHE Dte." Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000136/2024-2025 319/KSD 07/06/2024 30 ER CONSTRUCTION & GENERAL ORDER SUPPLIER 3.83 0.00 0 100
1686 PURBA BARDHAMAN Burdwan Division Augmentation of Ganganandapur PWSS for providing FHTC. , SM/09411 Augmentation Laying of rising main along with crossing of pipeline by HDD/Jack pushing method with other allied work in connection with augmentation of Ganganandapur PWSS (SM/09411) & Rajapur PWSS (SM/ 14021), Purbasthali-I block under Kalna Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000278/2024-2025 2710/BWD 11/07/2024 264 MANASH GHOSH 81.34 0.00 0 60
1687 PURBA BARDHAMAN Burdwan Division Augmentation of Ganganandapur PWSS for providing FHTC. , SM/09411 Augmentation Augmentation of GANGANANDAPUR Piped Water Supply Scheme with LDS, FHTC, Rising Main, Construction of 300 Cum capacity OHR with 20.0 Mtr. Staging height inclusive of soil investigation & construction of pump house ( 3.60mx 3.0m) & boundary wall at new TW site under Purbasthali ¿ I Block, District - Purba Bardhaman. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000019/2022-2023 2013/BWD 18/04/2022 1020 MANASH GHOSH 421.40 377.79 89.65 70
1688 PURBA BARDHAMAN Raina-II Burdwan Division Narottambati Piped Water Supply Scheme , SM/15486 New Supply of Inspection Vehicle for inspection of different JJM related (Schemes) works as and when required including supply of driver & fuel (minimum 8 Hours duty per day) and all taxes etc. for Burdwan Sub-Division under Burdwan Division, P.H.E. Dte. consider 96.00 Km. run per day.[Period from 01/08/2023 to 31/10/2023] ORD/000845/2023-2024 1759/BSD 28/07/2023 66 MD HASIN 0.85 0.00 0 0
1689 PURBA BARDHAMAN Raina-II Burdwan Division Narottambati Piped Water Supply Scheme , SM/15486 New Material Requisition To Resource Division RTOR000352/2023-2024 2197/BWD 12/05/2023 0 Resource Division 11.94 0.00 0 0
1690 PURBA BARDHAMAN Raina-II Burdwan Division Narottambati Piped Water Supply Scheme , SM/15486 New Material Requisition To Resource Division RTOR000681/2023-2024 5081/BWD 23/11/2023 0 Resource Division 20.46 0.00 0 0
1691 PURBA BARDHAMAN Raina-II Burdwan Division Narottambati Piped Water Supply Scheme , SM/15486 New Material Requisition To Resource Division RTOR000425/2023-2024 3837/BWD 01/09/2023 0 Resource Division 6.91 0.00 0 0
1692 PURBA BARDHAMAN Raina-II Central Mechanical Narottambati Piped Water Supply Scheme , SM/15486 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Satinandi,Sanko & others water supply scheme under Galsi-1 Block ; Serpur, Uchalan & others water supply scheme under Raina-2 Block and maro, loapur & others water supply scheme under Galsi-2 block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000397/2024-2025 2751/CMD 24/09/2024 90 ORIENTAL ENGINEERING CO. 88.42 0.00 0 0
1693 PURBA BARDHAMAN Raina-II Central Mechanical Narottambati Piped Water Supply Scheme , SM/15486 New New service connection for Narottambati PWSS. BILL/02404/2023-2024 BP-2023-24-496 06/02/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 5.09 0.00 0 0
1694 PURBA BARDHAMAN Raina-II Central Mechanical Narottambati Piped Water Supply Scheme , SM/15486 New NEW SERVICE CONNECTION FOR NAROTTAMBATI PWSS TW 2. BILL/03180/2023-2024 BP-2023-24-664 22/03/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 10.31 0.00 0 0
1695 PURBA BARDHAMAN Raina-II Burdwan Division Narottambati Piped Water Supply Scheme , SM/15486 New NAROTTAMBATI Piped Water Supply Scheme with sinking of Tube-well, LDS, Rising Main, FHTC, Construction of 300 cum capacity RCC OHR with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drain and internal pathway at different TW site under Raina-II Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000488/2023-2024 3501/BWD 10/08/2023 875 S.S.S. ENTERPRISES 585.33 149.09 25.47 75
1696 PURBA BARDHAMAN Raina-II Burdwan Division Narottambati Piped Water Supply Scheme , SM/15486 New Continuation work order for "Supply of one No. Diesel Driven Ambassador Car on hire basis for the office of the Assistant Engineer, Burdwan Sub-Division, PHE Dte. (Period from 01-12-2024 to 28-02-2025 JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/001043/2024-2025 2636/BSD 29/11/2024 90 SK. ASFIA 1.20 0.36 30 60
1697 PURBA BARDHAMAN Central Mechanical AUGMENTATION OF MANGALKOT PIPED WATER SUPPLY SCHEME , SM/16487 Augmentation Supply & Installation of Submersible Pumping Machinery , Voltage Stabilizer, Chlorination system and internal House wiring for Tube well no.- 1&2 at Augmentation of Mongolkot Water Supply Scheme under CMD, PHE Dte., Dist.- Purba-Bardhaman. Driller In-Charge Junior Engineer ORD/000120/2023-2024 2631/CMD 13/06/2023 30 S.K. ELECTRICALS 22.05 0.00 0 0
1698 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF MANGALKOT PIPED WATER SUPPLY SCHEME , SM/16487 Augmentation Extension and replacement of pipe line from the existing Distribution System within scheme jurisdiction at Mongalkote village under Mongalkote PWSS under Mongalkote Block within Katwa Sub-Division under Burdwan Division PHE Dte. [Sl No-01] Assistant Engineer ORD/000153/2022-2023 437/KTS 27/06/2022 30 NANGTASWAR CO. OP. LABOUR CONT. AND CONSTRUCTION SOCIETY LTD. 4.84 4.81 99.38 0
1699 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF MANGALKOT PIPED WATER SUPPLY SCHEME , SM/16487 Augmentation Sinking of 300 X 200mm dia Tube Well 200 mtr. Depth by D.R. Rig method using UPVC pipe (CM) and UPVC Deep Well Screen (RMS) for Augmentation of Mongalkote & Natunhat and its adjoining mouzas Piped Water Supply Scheme, Block - Mongalkote, Dist - Purba Bardhaman under Burdwan Division, PHE Dte. Assistant Engineer ORD/000517/2022-2023 4658/BWD 18/10/2022 30 ANIRUDDHA FARUQUE 13.24 8.79 66.39 1
1700 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF MANGALKOT PIPED WATER SUPPLY SCHEME , SM/16487 Augmentation Detail route survey, design of distribution network and preparation of estimate, drawing & DPR for providing FHTC in the scheme MONGALKOTE PWSS (Sl No-06) Assistant Engineer JUNIOR ENGINEER KATWA SUB-DIVISION PHE DTE ORD/000074/2023-2024 399/KTS 13/04/2023 30 SIRCON ENGINEERING SERVICES 2.93 2.93 100 100
1701 PURBA BARDHAMAN Central Mechanical AUGMENTATION OF MANGALKOT PIPED WATER SUPPLY SCHEME , SM/16487 Augmentation Yard lighting arrangement & allied works at Mangalkote water supply scheme under Mangalkote Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. Driller In-Charge Junior Engineer ORD/000410/2024-2025 2790/CMD 01/10/2024 60 JAGANNATH ENTERPRISE 13.47 0.00 0 0
1702 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF MANGALKOT PIPED WATER SUPPLY SCHEME , SM/16487 Augmentation Augmentation of MANGALKOTE Piped Water Supply Scheme with sinking of Tube-well, LDS, Rising Main, FHTC, Construction of 350 cum capacity RCC OHR with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drain and internal pathway at different TW site under MONGALKOTE Block, District:- Purba-Bardhaman. Assistant Engineer JUNIOR ENGINEER R.W.S. BURDWAN SUB-DIVISION PHE DTE ORD/000696/2023-2024 4365/BWD 04/10/2023 910 M/S NATIONAL CONSTRUCTION 689.68 0.00 0 25
1703 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF MANGALKOT PIPED WATER SUPPLY SCHEME , SM/16487 Augmentation Different types of works involve in connection with implementation of Aug. Mongalkote, Palishgram, Purba Nowapara, Sitahati, Singhi, Mejhiary & Karui Piped Water Supply Scheme within Katwa Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer ORD/001191/2024-2025 873/BWD 06/03/2025 180 M/S S. CHOUDHURY 588.22 0.00 0 0
1704 PURBA BARDHAMAN Ketugram-I Burdwan Division MALGRAM PIPED WATER SUPPLY SCHEME , SM/15150 New Material Requisition To Resource Division RTOR000008/2023-2024 1962/BWD 25/04/2023 0 Resource Division 1.83 0.00 0 0
1705 PURBA BARDHAMAN Ketugram-I Burdwan Division MALGRAM PIPED WATER SUPPLY SCHEME , SM/15150 New Material Requisition To Resource Division RTOR000338/2023-2024 2197/BWD 12/05/2023 0 Resource Division 7.73 0.00 0 0
1706 PURBA BARDHAMAN Ketugram-I Burdwan Division MALGRAM PIPED WATER SUPPLY SCHEME , SM/15150 New Material Requisition To Resource Division RTOR000743/2023-2024 5259/BWD 30/11/2023 0 Resource Division 20.18 0.00 0 0
1707 PURBA BARDHAMAN Ketugram-I Central Mechanical MALGRAM PIPED WATER SUPPLY SCHEME , SM/15150 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Rajur & others water supply scheme under Ketugram-I Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. Driller In-Charge Junior Engineer ORD/000098/2024-2025 2407/CMD 02/08/2024 90 M.S. ENTERPRISE 82.29 0.00 0 0
1708 PURBA BARDHAMAN Ketugram-I Burdwan Division MALGRAM PIPED WATER SUPPLY SCHEME , SM/15150 New Material Requisition To Resource Division RTOR000016/2024-2025 4108/BWD 25/11/2024 0 Resource Division 4.93 0.00 0 0
1709 PURBA BARDHAMAN Ketugram-I Central Mechanical MALGRAM PIPED WATER SUPPLY SCHEME , SM/15150 New Quotation for new service connection at Malgram PWSS PH-2. BILL/00418/2024-2025 BP-2024-25-225 26/07/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 4.27 0.00 0 0
1710 PURBA BARDHAMAN Ketugram-I Central Mechanical MALGRAM PIPED WATER SUPPLY SCHEME , SM/15150 New Quotation for new service connection at Malgram PWSS PH-I. BILL/00346/2024-2025 BP-2024-25-168 01/07/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.14 0.00 0 0
1711 PURBA BARDHAMAN Ketugram-I Burdwan Division MALGRAM PIPED WATER SUPPLY SCHEME , SM/15150 New Different works related (sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of different capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site) to MALGRAM, MURGRAM, MORGRAM & KHANJI Piped Water Supply Scheme under KETUGRAM -I Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer JUNIOR ENGINEER R.W.S. BURDWAN SUB-DIVISION PHE DTE ORD/000435/2023-2024 3387/BWD 03/08/2023 882 PUSPA ENTERPRISE 1,333.98 201.38 15.1 40
1712 PURBA BARDHAMAN Ketugram-I Central Mechanical MALGRAM PIPED WATER SUPPLY SCHEME , SM/15150 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at MALGRAM Water Supply Scheme [ Block- KETUGRAM-1] under CMD, PHE Dte., Dist.- Purba-Bardhaman. Driller In-Charge Junior Engineer ORD/000865/2023-2024 4120/CMD 29/08/2023 550 ANANTA ELECTRICAL ENGINEERING CONSTRUCTION 27.75 6.10 21.98 82
1713 PURBA BARDHAMAN Ketugram-I Burdwan Division MALGRAM PIPED WATER SUPPLY SCHEME , SM/15150 New Balance work for OHR, extension of pipeline to provide FHTC with sinking of tube well, construction of pump house, boundary wall, land development, plinth protection for pump house, approach road & other related work under Murgram, Moregram, Malgram, Khanji, PWSS under Katwa Sub Division, Block- Ketugram-I, Burdwan Division PHE Dte. Assistant Engineer JUNIOR ENGINEER R.W.S. BURDWAN SUB-DIVISION PHE DTE ORD/000289/2024-2025 2739/BWD 12/07/2024 173 PUSPA ENTERPRISE 185.75 21.72 11.69 72
1714 PURBA BARDHAMAN Ketugram-I Central Drilling KHATUNDI PIPED WATER SUPPLY SCHEME , SM/15154 New Providing drilling crew and other allied works for construction of Tube Well (250mm X200mm X 114 Mtrs. Depth) by utilising Departmental Machineries for Khatundi W/S Scheme (T/W-I & II) , Ketugram-I Block under PurbaBardhman District, Central Drilling Division, P.H.E. Dte. Driller In Charge Junior Engineer ORD/000172/2023-2024 1055/CDD 16/08/2023 30 OSMAN SEKH 16.61 0.00 0 0
1715 PURBA BARDHAMAN Ketugram-I Burdwan Division KHATUNDI PIPED WATER SUPPLY SCHEME , SM/15154 New Material Requisition To Resource Division RTOR000384/2023-2024 2197/BWD 12/05/2023 0 Resource Division 10.05 0.00 0 0
1716 PURBA BARDHAMAN Ketugram-I Burdwan Division KHATUNDI PIPED WATER SUPPLY SCHEME , SM/15154 New Material Requisition To Resource Division RTOR000456/2023-2024 3980/BWD 08/09/2023 0 Resource Division 0.66 0.00 0 0
1717 PURBA BARDHAMAN Ketugram-I Burdwan Division KHATUNDI PIPED WATER SUPPLY SCHEME , SM/15154 New Material Requisition To Resource Division RTOR000739/2023-2024 5251/BWD 30/11/2023 0 Resource Division 20.18 0.00 0 0
1718 PURBA BARDHAMAN Ketugram-I Central Mechanical KHATUNDI PIPED WATER SUPPLY SCHEME , SM/15154 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Rajur & others water supply scheme under Ketugram-I Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. Driller In-Charge Junior Engineer ORD/000098/2024-2025 2407/CMD 02/08/2024 90 M.S. ENTERPRISE 82.29 0.00 0 0
1719 PURBA BARDHAMAN Ketugram-I Central Mechanical KHATUNDI PIPED WATER SUPPLY SCHEME , SM/15154 New Supply & Installation of Submersible Pumping Machinery , Voltage Stabilizer, Chlorination System and Internal House wiring for Tube well no.- 1 & 2 at KHATUNDI Water Supply Scheme [Block - KETUGRAM-1] under CMD, PHE Dte., Dist.- Purba-Bardhaman. Driller In-Charge Junior Engineer ORD/000848/2023-2024 4121/CMD 29/08/2023 30 A.K SIKDAR 20.81 19.62 94.28 91
1720 PURBA BARDHAMAN Ketugram-I Central Mechanical KHATUNDI PIPED WATER SUPPLY SCHEME , SM/15154 New New service connection charges for Khatundi PWSS TW-1 BILL/01725/2023-2024 BP-2023-24-252 07/12/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.23 0.00 0 0
1721 PURBA BARDHAMAN Ketugram-I Central Mechanical KHATUNDI PIPED WATER SUPPLY SCHEME , SM/15154 New New Service connection for Khatundi PWSS TW-2 BILL/02346/2023-2024 BP-2023-24-463 31/01/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.33 0.00 0 0
1722 PURBA BARDHAMAN Ketugram-I Burdwan Division KHATUNDI PIPED WATER SUPPLY SCHEME , SM/15154 New KHATUNDI Piped Water Supply Scheme with sinking of Tube-well, LDS, Construction of 150 cum RCC OHR with 20 mtr. staging height including soil testing, Rising Main, FHTC & construction of switch rooms & boundary walls with gates and land development, drain and internal pathway at different TW site under Ketugram-I Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer JUNIOR ENGINEER R.W.S. BURDWAN SUB-DIVISION PHE DTE ORD/000413/2023-2024 3258/BWD 27/07/2023 767 SUJAN KUMAR MISTRY 260.06 198.62 76.37 60
1723 PURBA BARDHAMAN Ketugram-I Burdwan Division KHATUNDI PIPED WATER SUPPLY SCHEME , SM/15154 New Balance Work For OHR, Extension Of Pipeline To Provide FHTC With Sinking Of Tube Well, Construction Of Pump House, Boundary Wall, Land Development, Plinth Protection For Pump House, Approach Road & Other Related Work Under Bakalsa, Chakdaha, Ehaipur, Khatundi And Ketugram (Zone-I) Part-A & B PWSS Under Katwa Sub Division, Block- Ketugram-I, Burdwan Division PHE Dte. Assistant Engineer JUNIOR ENGINEER R.W.S. BURDWAN SUB-DIVISION PHE DTE ORD/000288/2024-2025 2741/BWD 12/07/2024 415 M/S M.M. ENTERPRISE 205.15 19.03 9.28 65
1724 PURBA BARDHAMAN Raina-II Burdwan Division Chaudanga Piped Water Supply Scheme , SM/15489 New Material Requisition To Resource Division RTOR000419/2023-2024 3863/BWD 01/09/2023 0 Resource Division 3.95 0.00 0 0
1725 PURBA BARDHAMAN Raina-II Burdwan Division Chaudanga Piped Water Supply Scheme , SM/15489 New Material Requisition To Resource Division RTOR000303/2023-2024 2197/BWD 12/05/2023 0 Resource Division 12.30 0.00 0 0
1726 PURBA BARDHAMAN Raina-II Burdwan Division Chaudanga Piped Water Supply Scheme , SM/15489 New Material Requisition To Resource Division RTOR000662/2023-2024 5082/BWD 23/11/2023 0 Resource Division 20.46 0.00 0 0
1727 PURBA BARDHAMAN Raina-II Burdwan Division Chaudanga Piped Water Supply Scheme , SM/15489 New Continuation work order for "Supply of one No. Diesel Driven Ambassador Car on hire basis for the office of the Assistant Engineer, Burdwan Sub-Division, PHE Dte. (Period from 01-09-2024 to 30-11-2024 Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000682/2024-2025 1957/BSD 30/08/2024 91 SK. ASFIA 1.20 0.40 33.33 60
1728 PURBA BARDHAMAN Raina-II Central Mechanical Chaudanga Piped Water Supply Scheme , SM/15489 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Satinandi,Sanko & others water supply scheme under Galsi-1 Block ; Serpur, Uchalan & others water supply scheme under Raina-2 Block and maro, loapur & others water supply scheme under Galsi-2 block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000397/2024-2025 2751/CMD 24/09/2024 90 ORIENTAL ENGINEERING CO. 88.42 0.00 0 0
1729 PURBA BARDHAMAN Raina-II Central Mechanical Chaudanga Piped Water Supply Scheme , SM/15489 New New electric connection for Chaudanga PWSS, PH-1. BILL/01884/2023-2024 BP-2023-24-347 11/01/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 2.67 0.00 0 0
1730 PURBA BARDHAMAN Raina-II Central Mechanical Chaudanga Piped Water Supply Scheme , SM/15489 New New electric connection for Chuadanga PWSS, PH-2. BILL/01885/2023-2024 BP-2023-24-348 11/01/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 4.13 0.00 0 0
1731 PURBA BARDHAMAN Raina-II Burdwan Division Chaudanga Piped Water Supply Scheme , SM/15489 New Different works related (sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of different capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site) to BARABAINAN & CHAUDANGA Piped Water Supply Scheme under Raina ¿ II Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000412/2023-2024 3257/BWD 27/07/2023 807 SK ALIM 1,144.16 288.08 25.18 90
1732 PURBA BARDHAMAN Burdwan Division AUGMENTATION RAYAN PART IV (DURGADANGA) PIPED WATER SUPPLY SCHEME , SM/15556 Augmentation Route Survey & Preparation of DPR for RAYAN PART-(IV) DURGA DANGA W/S Scheme under Burdwan-I Block under Burdwan Sub- Division under Burdwan Division PHE Dte JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000851/2024-2025 2587/BSD 26/11/2024 45 APEX ENGINEERING 2.43 0.00 0 0
1733 PURBA BARDHAMAN Burdwan Division AUGMENTATION RAYAN PART IV (DURGADANGA) PIPED WATER SUPPLY SCHEME , SM/15556 Augmentation Material Requisition To Resource Division RTOR000003/2024-2025 4102/BWD 25/11/2024 0 Resource Division 10.19 0.00 0 0
1734 PURBA BARDHAMAN Central Mechanical AUGMENTATION RAYAN PART IV (DURGADANGA) PIPED WATER SUPPLY SCHEME , SM/15556 Augmentation Quotation for new service connection of Rayan (Aug) Part-4 (Durgadanga) PWSS TW 1 BILL/00443/2024-2025 BP-2024-25-236 30/07/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 5.91 0.00 0 0
1735 PURBA BARDHAMAN Central Mechanical AUGMENTATION RAYAN PART IV (DURGADANGA) PIPED WATER SUPPLY SCHEME , SM/15556 Augmentation Supply & Installation of Submersible Pumping Machinery , Voltage Stabilizer, Chlorination system and internal House wiring for Tube well no.- 1&2 at Augumentation of Rayan. Part -4 Durgadanga Water Supply Scheme under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER Junior Engineer ORD/000095/2023-2024 2597/CMD 07/06/2023 693 M/S, S.S. ENTERPRISE. 24.11 9.01 37.37 50
1736 PURBA BARDHAMAN Burdwan Division AUGMENTATION RAYAN PART IV (DURGADANGA) PIPED WATER SUPPLY SCHEME , SM/15556 Augmentation Providing 32 Nos. FHTC at Krishnapur village under RAYAN [ PART-IV] DURGADANGA Piped Water Supply Scheme, Block- Burdwan-I within Burdwan Sub Division under Burdwan Division PHE Dte. ORD/000764/2025-2026 1469/BSD 23/06/2025 60 POMPA CONSTRUCTION CO. 3.28 0.00 0 0
1737 PURBA BARDHAMAN Ketugram-I Central Drilling MORGRAM PIPED WATER SUPPLY SCHEME , SM/15163 New Providing drilling crew and other allied works for construction of Tube Well (250mm X200mm X 114 Mtrs. Depth) by utilising Departmental Machineries for Morgram W/S Scheme (T/W-I & II) , Ketugram-I Block under PurbaBardhman District, Central Drilling Division, P.H.E. Dte. Driller In Charge Junior Engineer ORD/000170/2023-2024 1346/CDD 13/09/2023 30 S B S ENTERPRISE 16.67 0.00 0 0
1738 PURBA BARDHAMAN Ketugram-I Burdwan Division MORGRAM PIPED WATER SUPPLY SCHEME , SM/15163 New Material Requisition To Resource Division RTOR000010/2023-2024 1962/BWD 25/04/2023 0 Resource Division 3.97 0.00 0 0
1739 PURBA BARDHAMAN Ketugram-I Burdwan Division MORGRAM PIPED WATER SUPPLY SCHEME , SM/15163 New Material Requisition To Resource Division RTOR000745/2023-2024 5257/BWD 30/11/2023 0 Resource Division 20.18 0.00 0 0
1740 PURBA BARDHAMAN Ketugram-I Burdwan Division MORGRAM PIPED WATER SUPPLY SCHEME , SM/15163 New Material Requisition To Resource Division RTOR000344/2023-2024 2197/BWD 12/05/2023 0 Resource Division 17.45 0.00 0 0
1741 PURBA BARDHAMAN Ketugram-I Central Mechanical MORGRAM PIPED WATER SUPPLY SCHEME , SM/15163 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at MORGRAM Water Supply Scheme [ Block- KETUGRAM-1] under CMD, PHE Dte., Dist.- Purba-Bardhaman. Driller In-Charge Junior Engineer ORD/000857/2023-2024 4125/CMD 29/08/2023 30 JAGANNATH ENTERPRISE 27.79 21.65 77.91 88
1742 PURBA BARDHAMAN Ketugram-I Central Mechanical MORGRAM PIPED WATER SUPPLY SCHEME , SM/15163 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Rajur & others water supply scheme under Ketugram-I Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. Driller In-Charge Junior Engineer ORD/000098/2024-2025 2407/CMD 02/08/2024 90 M.S. ENTERPRISE 82.29 0.00 0 0
1743 PURBA BARDHAMAN Ketugram-I Central Mechanical MORGRAM PIPED WATER SUPPLY SCHEME , SM/15163 New Quotation for new service connection at Morgram W/S Scheme PH-II. BILL/01806/2023-2024 BP-2023-24-316 30/12/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.70 0.00 0 0
1744 PURBA BARDHAMAN Ketugram-I Central Mechanical MORGRAM PIPED WATER SUPPLY SCHEME , SM/15163 New Quotation for new service connection at Morgram W/S Scheme PH-I. BILL/01805/2023-2024 BP-2023-24-315 30/12/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.76 0.00 0 0
1745 PURBA BARDHAMAN Ketugram-I Burdwan Division MORGRAM PIPED WATER SUPPLY SCHEME , SM/15163 New Different works related (sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of different capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site) to MALGRAM, MURGRAM, MORGRAM & KHANJI Piped Water Supply Scheme under KETUGRAM -I Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer JUNIOR ENGINEER R.W.S. BURDWAN SUB-DIVISION PHE DTE ORD/000435/2023-2024 3387/BWD 03/08/2023 882 PUSPA ENTERPRISE 1,333.98 142.34 10.67 40
1746 PURBA BARDHAMAN Ketugram-I Burdwan Division MORGRAM PIPED WATER SUPPLY SCHEME , SM/15163 New Balance work for OHR, extension of pipeline to provide FHTC with sinking of tube well, construction of pump house, boundary wall, land development, plinth protection for pump house, approach road & other related work under Murgram, Moregram, Malgram, Khanji, PWSS under Katwa Sub Division, Block- Ketugram-I, Burdwan Division PHE Dte. Assistant Engineer JUNIOR ENGINEER R.W.S. BURDWAN SUB-DIVISION PHE DTE ORD/000289/2024-2025 2739/BWD 12/07/2024 173 PUSPA ENTERPRISE 185.75 19.02 10.24 72
1747 PURBA BARDHAMAN Ketugram-I Burdwan Division MORGRAM PIPED WATER SUPPLY SCHEME , SM/15163 New Extension work of pipe line MORGRAM Piped W/S. Scheme under Ketugram-I Block under Katwa Sub-Division within Burdwan Division PHE Dte. Assistant Engineer JUNIOR ENGINEER R.W.S. BURDWAN SUB-DIVISION PHE DTE ORD/001067/2023-2024 990/BWD 06/03/2024 482 PUSPA ENTERPRISE 133.47 128.97 96.63 82
1748 PURBA BARDHAMAN Ketugram-I Central Drilling CHATKA PIPED WATER SUPPLY SCHEME , SM/15168 New Providing drilling crew and other allied works for construction of Tube Well (250mm X200mm X 114 Mtrs. Depth) by utilising Departmental Machineries for Chatka W/S Scheme (T/W-I & II), Ketugram-I Block under Purba Bardhman District, Central Drilling Division, P.H.E. Dte. Driller In Charge Junior Engineer ORD/000174/2023-2024 1344/CDD 13/09/2023 30 OSMAN SEKH 16.61 0.00 0 0
1749 PURBA BARDHAMAN Ketugram-I Burdwan Division CHATKA PIPED WATER SUPPLY SCHEME , SM/15168 New Material Requisition To Resource Division RTOR000304/2023-2024 2197/BWD 12/05/2023 0 Resource Division 2.18 0.00 0 0
1750 PURBA BARDHAMAN Ketugram-I Burdwan Division CHATKA PIPED WATER SUPPLY SCHEME , SM/15168 New Material Requisition To Resource Division RTOR000430/2023-2024 3856/BWD 01/09/2023 0 Resource Division 0.69 0.00 0 0
1751 PURBA BARDHAMAN Ketugram-I Burdwan Division CHATKA PIPED WATER SUPPLY SCHEME , SM/15168 New Material Requisition To Resource Division RTOR000738/2023-2024 5232/BWD 30/11/2023 0 Resource Division 20.18 0.00 0 0
1752 PURBA BARDHAMAN Ketugram-I Central Mechanical CHATKA PIPED WATER SUPPLY SCHEME , SM/15168 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Rajur & others water supply scheme under Ketugram-I Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. Driller In-Charge Junior Engineer ORD/000098/2024-2025 2407/CMD 02/08/2024 90 M.S. ENTERPRISE 82.29 0.00 0 0
1753 PURBA BARDHAMAN Ketugram-I Central Mechanical CHATKA PIPED WATER SUPPLY SCHEME , SM/15168 New New service connection charges for Chatka PWSS TW-2 BILL/01768/2023-2024 BP-2023-24-277 21/12/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.06 0.00 0 0
1754 PURBA BARDHAMAN Ketugram-I Central Mechanical CHATKA PIPED WATER SUPPLY SCHEME , SM/15168 New New service connection charges for Chatka PWSS TW-1 BILL/01767/2023-2024 BP-2023-24-276 21/12/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 5.85 0.00 0 0
1755 PURBA BARDHAMAN Purbasthali-II Central Mechanical JOYKRISHNAPUR PIPED WATER SUPPLY SCHEME , SM/15172 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination system and internal House wiring for Tube well no.- 3 at Joykrishnapur Water Supply Scheme under CMD, PHE Dte., Dist.- Purba-Bardhaman. Driller In-Charge JUNIOR ENGINEER ORD/000762/2022-2023 838/CMD 20/02/2023 30 C.M. ENTERPRISE 10.43 9.62 92.23 100
1756 PURBA BARDHAMAN Purbasthali-II Central Mechanical JOYKRISHNAPUR PIPED WATER SUPPLY SCHEME , SM/15172 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination system and internal House wiring for Tube well no.- 4 at Joykrishnapur Water Supply Scheme under CMD, PHE Dte., Dist.- Purba-Bardhaman. Driller In-Charge JUNIOR ENGINEER ORD/000763/2022-2023 839/CMD 20/02/2023 30 MS MANABESH ROY 10.14 9.61 94.77 100
1757 PURBA BARDHAMAN Purbasthali-II Burdwan Division JOYKRISHNAPUR PIPED WATER SUPPLY SCHEME , SM/15172 New Material Requisition To Resource Division RTOR000540/2023-2024 4288/BWD 29/09/2023 0 Resource Division 0.55 0.00 0 0
1758 PURBA BARDHAMAN Purbasthali-II Burdwan Division JOYKRISHNAPUR PIPED WATER SUPPLY SCHEME , SM/15172 New Material Requisition To Resource Division RTOR000297/2023-2024 2197/BWD 12/05/2023 0 Resource Division 12.33 0.00 0 0
1759 PURBA BARDHAMAN Purbasthali-II Burdwan Division JOYKRISHNAPUR PIPED WATER SUPPLY SCHEME , SM/15172 New Material Requisition To Resource Division RTOR000513/2023-2024 4037/BWD 08/09/2023 0 Resource Division 37.20 0.00 0 0
1760 PURBA BARDHAMAN Purbasthali-II Burdwan Division JOYKRISHNAPUR PIPED WATER SUPPLY SCHEME , SM/15172 New Laying of Rising main in between Tube Well and Distribution Line for Shimulia Village in Galsi -II Block under Durgapur Sub-Division under Burdwan Division, P.H.E. Dte.. Assistant Engineer, Durgapur Sub Division, P.H.E. Dte JUNIOR ENGINEER DURGAPUR SUB-DIVISION PHE DTE ORD/000396/2024-2025 621/DSD 05/08/2024 30 MAA MAHAMAYA CONSTRUCTION 2.15 2.13 99.07 100
1761 PURBA BARDHAMAN Purbasthali-II Burdwan Division JOYKRISHNAPUR PIPED WATER SUPPLY SCHEME , SM/15172 New Work Order for "CONSTRUCTION OF TEMPORARY KIOSK FOR THE NECESSARY ARRANGEMENT OF ELECTRIFICATION OF TUBEWELL FOR JOYKRISHNAPUR PWSS UNDER KALNA SUB-DIVISION UNDER BURDWAN DIVISION, PHE DTE.". Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000569/2024-2025 1015/KSD 07/08/2024 15 DEL DELTA CONSTRUCTION 0.66 0.66 100 100
1762 PURBA BARDHAMAN Purbasthali-II Durgapur W/S Division JOYKRISHNAPUR PIPED WATER SUPPLY SCHEME , SM/15172 New Acceptance cum Formal Work order for Laying of interconnection for PH NO-3 (At Taranagar) Pipe Line for under JOYKRISHNAPUR PWSS, Galsi-II Block, under Durgapur W/S Division, PHE Dte. Assistant Engineer-II Contractual Junior Engineer_3 ORD/000162/2024-2025 1410/DWSD 01/10/2024 60 MUNSHI JAVEDUR JAMAN 0.63 0.58 92.06 100
1763 PURBA BARDHAMAN Purbasthali-II Central Mechanical JOYKRISHNAPUR PIPED WATER SUPPLY SCHEME , SM/15172 New Quotation for new service connection at Joykrishnapur PWSS PH-2 BILL/01817/2023-2024 BP-2023-24-333 03/01/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 12.33 0.00 0 0
1764 PURBA BARDHAMAN Purbasthali-II Central Mechanical JOYKRISHNAPUR PIPED WATER SUPPLY SCHEME , SM/15172 New New service connection charges for Joykrishnapur PWSS TW-1 BILL/02191/2023-2024 BP-2023-24-390 17/01/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.39 0.00 0 0
1765 PURBA BARDHAMAN Purbasthali-II Central Mechanical JOYKRISHNAPUR PIPED WATER SUPPLY SCHEME , SM/15172 New NEW SERVICE CONNECTION FOR JOYKRISHNAPUR PIPED WATER SUPPLY SCHEME. BILL/02828/2023-2024 BP-2023-24-592 04/03/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.43 0.00 0 0
1766 PURBA BARDHAMAN Purbasthali-II Central Mechanical JOYKRISHNAPUR PIPED WATER SUPPLY SCHEME , SM/15172 New Quotation for new service connection at Joykrishnapur W/S Scheme for PH No-1 BILL/01820/2023-2024 BP-2023-24-332 03/01/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 8.57 0.00 0 0
1767 PURBA BARDHAMAN Purbasthali-II Burdwan Division JOYKRISHNAPUR PIPED WATER SUPPLY SCHEME , SM/15172 New Different works related (sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of different capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site) to GHUNI & JOYKRISHNAPUR Piped Water Supply Scheme under Purbasthali II Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000492/2023-2024 3510/BWD 10/08/2023 808 BKB INFRA PROJECTS PRIVATE LIMITED 551.42 202.23 36.67 20
1768 PURBA BARDHAMAN Purbasthali-II Central Mechanical JOYKRISHNAPUR PIPED WATER SUPPLY SCHEME , SM/15172 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at JOYKRISHNAPUR Water Supply Scheme [ Block- PURBASTHALI-2] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000880/2023-2024 4143/CMD 29/08/2023 646 JYOTY SOLAR POWER. 26.98 0.00 0 45
1769 PURBA BARDHAMAN Purbasthali-II Burdwan Division JOYKRISHNAPUR PIPED WATER SUPPLY SCHEME , SM/15172 New Construction of 350cum OHR & Other Allied Works in connection with Augmentation of (SM/07803), (SM/09410), (SM/16304), (SM/15172) & (SM/14020) Piped Water Supply Scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/001048/2024-2025 220/BWD 10/01/2025 270 R.K. MANDAL& CO. 491.79 0.00 0 1
1770 PURBA BARDHAMAN Mangolkote Burdwan Division UNIATATARPUR PIPED WATER SUPPLY SCHEME , SM/15133 New Material Requisition To Resource Division RTOR000332/2023-2024 2197/BWD 12/05/2023 0 Resource Division 10.34 0.00 0 0
1771 PURBA BARDHAMAN Mangolkote Burdwan Division UNIATATARPUR PIPED WATER SUPPLY SCHEME , SM/15133 New Material Requisition To Resource Division RTOR000458/2023-2024 3982/BWD 08/09/2023 0 Resource Division 2.76 0.00 0 0
1772 PURBA BARDHAMAN Mangolkote Burdwan Division UNIATATARPUR PIPED WATER SUPPLY SCHEME , SM/15133 New Material Requisition To Resource Division RTOR000700/2023-2024 5070/BWD 23/11/2023 0 Resource Division 20.46 0.00 0 0
1773 PURBA BARDHAMAN Mangolkote Central Mechanical UNIATATARPUR PIPED WATER SUPPLY SCHEME , SM/15133 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at UNIATATARPUR Water Supply Scheme [ Block- MONGOLKOTE] under CMD, PHE Dte., Dist.- Purba-Bardhaman. Driller In-Charge Junior Engineer ORD/000824/2023-2024 4101/CMD 29/08/2023 30 CHOUDHURY ENTERPRISE 26.93 20.81 77.27 48
1774 PURBA BARDHAMAN Mangolkote Burdwan Division UNIATATARPUR PIPED WATER SUPPLY SCHEME , SM/15133 New Balance work for OHR, extension of pipeline to provide FHTC in Barulia & Narayanpur mouza with Sinking of Tube well, Construction of Pump house, Boundary Wall, Land Development, Plinth Protection for pump house & OHR under, approach road to 2nd pump house UNIATATARPUR PWSS, Katwa Sub Division, Block- Mongolkote, Burdwan Division PHE Dte. Assistant Engineer JUNIOR ENGINEER KATWA SUB-DIVISION PHE DTE ORD/000504/2024-2025 3162/BWD 22/08/2024 120 POWER TOOLS & ENGINEERING 152.52 0.00 0 0
1775 PURBA BARDHAMAN Mangolkote Central Mechanical UNIATATARPUR PIPED WATER SUPPLY SCHEME , SM/15133 New Quotation for new service connection for Unitatarpur PWSS PH-1 BILL/00247/2024-2025 BP-2024-25-127 31/05/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 4.22 0.00 0 0
1776 PURBA BARDHAMAN Mangolkote Central Mechanical UNIATATARPUR PIPED WATER SUPPLY SCHEME , SM/15133 New Quotation for New service connection for Unitatarpur PWSS PH 2 BILL/00248/2024-2025 BP-2024-25-126 31/05/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.78 0.00 0 0
1777 PURBA BARDHAMAN Mangolkote Burdwan Division UNIATATARPUR PIPED WATER SUPPLY SCHEME , SM/15133 New Different works related (sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of different capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site) to DEULIA, GOBARDHANPUR, KHARIJA-KASHIGRAM & UNIATATARPUR Piped Water Supply Scheme under Mangolkote Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer JUNIOR ENGINEER KATWA SUB-DIVISION PHE DTE ORD/000477/2023-2024 3491/BWD 09/08/2023 815 POWER TOOLS & ENGINEERING 1,741.05 137.46 7.9 10
1778 PURBA BARDHAMAN Mangolkote Central Mechanical UNIATATARPUR PIPED WATER SUPPLY SCHEME , SM/15133 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Lakshimpur & others water supply scheme under Mangalkote Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman Driller In-Charge Junior Engineer ORD/000097/2024-2025 2406/CMD 02/08/2024 290 CHOUDHURY ENTERPRISE 57.65 0.00 0 10
1779 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED PIPED WATER SUPPLY SCHEME FOR ABUJHATI , SM/15184 Augmentation Preparation and Submission of DPR for Augmentation of ABUJHATI PWSS under Jamalpur Development Block under Burdwan Division, P.H.E Dte.[2nd Call] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000364/2023-2024 1526/BSD 17/07/2023 15 MEASURE LAND 0.78 0.77 98.72 100
1780 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED PIPED WATER SUPPLY SCHEME FOR ABUJHATI , SM/15184 Augmentation Laying of HDPE Pipeline from 4th Number Pump House to main distribution system for ABUJHATI Piped W/S Scheme, Jamalpur Dev. Block under Burdwan Division, PHE Dte. ORD/000722/2023-2024 3925/BWD 05/09/2023 30 MAA BHABANI CONSTRUCTION 21.04 20.26 96.29 100
1781 PURBA BARDHAMAN Central Mechanical AUGMENTATION OF GROUND WATER BASED PIPED WATER SUPPLY SCHEME FOR ABUJHATI , SM/15184 Augmentation New service connection charges for Abujhati PWSS TW-4 BILL/00765/2023-2024 BP-2023-24-66 20/07/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 4.26 0.00 0 0
1782 PURBA BARDHAMAN Central Mechanical AUGMENTATION OF GROUND WATER BASED PIPED WATER SUPPLY SCHEME FOR ABUJHATI , SM/15184 Augmentation Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination system and internal House wiring for Tube well no.- 1 at Augmentation of ABUJHATI[JAMALPUR] Water Supply Scheme under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000568/2023-2024 3902/CMD 18/08/2023 30 KUNDU CONSTRUCTION. 12.25 10.78 88 95
1783 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED PIPED WATER SUPPLY SCHEME FOR ABUJHATI , SM/15184 Augmentation Extension of CIDF/D.I Pipes with specials for providing FHTC at Siromoni mouza within command area of Abujhati Piped W/S Scheme Jamalpur Development Block under Burdwan Division,PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. RWS_JAMALPUR ORD/000181/2023-2024 1005/BSD 06/06/2023 15 DEBASHISH ENTERPRISE 0.94 0.79 84.04 100
1784 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED PIPED WATER SUPPLY SCHEME FOR ABUJHATI , SM/15184 Augmentation Laying different dia UPVC Pipeline for inter connection of existing FHTC near Raypara of Abujhati Flyover i.c.w. Road widening from 4 lane to 6 lane of NH-2 at chane 601+9521+960 under ABUIHATI PWSS in jamalpur Block within Burdwan Sub Divn. under Burdwan Division, P.H.E. Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/001173/2023-2024 532/BSD 14/03/2024 30 SOUMYAVASH DAS 0.89 0.88 98.88 100
1785 PURBA BARDHAMAN Central Mechanical AUGMENTATION OF GROUND WATER BASED PIPED WATER SUPPLY SCHEME FOR ABUJHATI , SM/15184 Augmentation Illumination arrangement and miscelleneous works at Abujhati water supply scheme under Jamalpur Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000404/2024-2025 2783/CMD 01/10/2024 60 M/S. S.R. ENTERPRISE 19.25 0.00 0 20
1786 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED PIPED WATER SUPPLY SCHEME FOR ABUJHATI , SM/15184 Augmentation Construction & Installation of Sluice valve & valve Chamber to control the flow of water with laying of u-PVC Pipe under Abujhati PWSS, Jamalpur Dev. Block under Burdwan Division, PHE Dte. JE/RWS/JAMALPUR ORD/001293/2024-2025 351/AE/HQ 10/03/2025 30 DEBASHISH ENTERPRISE 5.47 0.00 0 0
1787 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF RAYAN PART III (KOPIBAGAN) PIPED WATER SUPPLY SCHEME , SM/16548 Augmentation Route Survey & Preparation of DPR for RAYAN PART-III KOPIBAGAN W/S Scheme under Burdwan-I Block under Burdwan Sub- Division under Burdwan Division PHE Dte. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000849/2024-2025 2586/BSD 26/11/2024 45 APEX ENGINEERING 2.57 0.00 0 0
1788 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF RAYAN PART III (KOPIBAGAN) PIPED WATER SUPPLY SCHEME , SM/16548 Augmentation Re-Connection of existing FHTC from newly laid distribution pipe At SUKANTA PALLY for Augmentation of RAYAN (PART-III) [ KOPIBAGAN] PIPED WATER SUPPLY SCHEME , Block- Burdwan-I , within Burdwan Sub Division under Burdwan Division PHE Dte JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000128/2024-2025 1009/BSD 06/06/2024 30 SK RAJU 0.96 0.00 0 0
1789 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF RAYAN PART III (KOPIBAGAN) PIPED WATER SUPPLY SCHEME , SM/16548 Augmentation Re-Connection of existing FHTC from newly laid distribution pipe At KHA PUKUR ADIBASIPARA for Augmentation of RAYAN (PART-III) [ KOPIBAGAN] PIPED WATER SUPPLY SCHEME , Block- Burdwan-I , within Burdwan Sub Division under Burdwan Division PHE Dte. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000142/2024-2025 1030/BSD 10/06/2024 30 SK RAJU 0.96 0.00 0 0
1790 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF RAYAN PART III (KOPIBAGAN) PIPED WATER SUPPLY SCHEME , SM/16548 Augmentation Material Requisition To Resource Division RTOR000004/2024-2025 4100/BWD 25/11/2024 0 Resource Division 11.09 0.00 0 0
1791 PURBA BARDHAMAN Central Mechanical AUGMENTATION OF RAYAN PART III (KOPIBAGAN) PIPED WATER SUPPLY SCHEME , SM/16548 Augmentation Supply & Installation of Submersible Pumping Machinery , Voltage Stabilizer, Chlorination system and internal House wiring for Tube well no.- 1&2 at Augumentation of Rayan. Part -3 Kopibagan Water Supply Scheme under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER Junior Engineer ORD/000092/2023-2024 2596/CMD 07/06/2023 694 CHOUDHURY ENTERPRISE 24.13 6.45 26.73 50
1792 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF RAYAN PART III (KOPIBAGAN) PIPED WATER SUPPLY SCHEME , SM/16548 Augmentation Augmentation of RAYAN (Part-III) (KOPIBAGAN) Piped Water Supply Scheme with sinking of Tube-well, LDS, Rising Main, FHTC, Construction of switch rooms & boundary walls with gates and land development, drain and internal pathway at different TW site under Burdwan -I Block, District:- Purba-Bardhaman. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000120/2023-2024 2304/BWD 19/05/2023 927 IJABUL SEKH 166.98 79.31 47.5 100
1793 PURBA BARDHAMAN Central Mechanical AUGMENTATION OF RAYAN PART III (KOPIBAGAN) PIPED WATER SUPPLY SCHEME , SM/16548 Augmentation Illumination arrangement & different electro-mechanical works at RAYAN water supply scheme under Bardhaman-I Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. ASSISTANT ENGINEER Junior Engineer ORD/000442/2024-2025 2799/CMD 01/10/2024 60 JOYGURU ENTERPRISE 6.04 0.00 0 40
1794 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF RAYAN PART III (KOPIBAGAN) PIPED WATER SUPPLY SCHEME , SM/16548 Augmentation Allied work for Road restoration work due to FHTC & Extension pipe line for different village and inside road of OHR side for Rayan pwss at Bardhhaman-I Development Block under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. Junior Engineer, Burdwan Sadar Sub-Division ORD/000301/2024-2025 1273/BSD 12/07/2024 217 MAA KALI CONSTRUCTION 3.89 0.00 0 100
1795 PURBA BARDHAMAN Ketugram-I Central Drilling ARGUN PIPED WATER SUPPLY SCHEME , SM/16482 New Providing drilling crew and other allied works for construction of Tube Well (250mm X200mm X 114 Mtrs. Depth) by utilising Departmental Machineries for Argun W/S Scheme (T/W-I & II) , Ketugram-I Block under Purba Bardhman District, Central Drilling Division, P.H.E. Dte. Driller In Charge Junior Engineer ORD/000171/2023-2024 1056/CDD 16/08/2023 30 C.M. ENTERPRISE 16.20 0.00 0 0
1796 PURBA BARDHAMAN Ketugram-I Burdwan Division ARGUN PIPED WATER SUPPLY SCHEME , SM/16482 New Material Requisition To Resource Division RTOR000095/2023-2024 1962/BWD 25/04/2023 0 Resource Division 2.38 0.00 0 0
1797 PURBA BARDHAMAN Ketugram-I Burdwan Division ARGUN PIPED WATER SUPPLY SCHEME , SM/16482 New Material Requisition To Resource Division RTOR000212/2023-2024 2155/BWD 10/05/2023 0 Resource Division 16.15 0.00 0 0
1798 PURBA BARDHAMAN Ketugram-I Burdwan Division ARGUN PIPED WATER SUPPLY SCHEME , SM/16482 New Material Requisition To Resource Division RTOR000742/2023-2024 5253/BWD 30/11/2023 0 Resource Division 20.18 0.00 0 0
1799 PURBA BARDHAMAN Ketugram-I Central Mechanical ARGUN PIPED WATER SUPPLY SCHEME , SM/16482 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Rajur & others water supply scheme under Ketugram-I Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. Driller In-Charge Junior Engineer ORD/000098/2024-2025 2407/CMD 02/08/2024 90 M.S. ENTERPRISE 82.29 0.00 0 0
1800 PURBA BARDHAMAN Ketugram-I Central Mechanical ARGUN PIPED WATER SUPPLY SCHEME , SM/16482 New New Service connection for Argun PWSS TW-1 BILL/02349/2023-2024 BP-2023-24-460 30/01/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 4.91 0.00 0 0
1801 PURBA BARDHAMAN Ketugram-I Central Mechanical ARGUN PIPED WATER SUPPLY SCHEME , SM/16482 New New Service connection at Argun PWSS PH-2 BILL/02344/2023-2024 BP-2023-24-461 30/01/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 5.63 0.00 0 0
1802 PURBA BARDHAMAN Ketugram-I Burdwan Division ARGUN PIPED WATER SUPPLY SCHEME , SM/16482 New Different works related (sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of different capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site) to AMEGERIA, ARGUN, CHINISPUR & KULUTIA Piped Water Supply Scheme under KETUGRAM -I Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer JUNIOR ENGINEER R.W.S. BURDWAN SUB-DIVISION PHE DTE ORD/000533/2023-2024 3630/BWD 21/08/2023 1107 M/S GOUTAM DAS 1,421.70 240.73 16.93 75
1803 PURBA BARDHAMAN Ketugram-I Burdwan Division ARGUN PIPED WATER SUPPLY SCHEME , SM/16482 New Hiring of one no Diesel Motor Cab (BS-VI) including the cost of fuel . mobile & other charges for the inspection of the different projects of JJM for the office of the Assistant Engineer, Katwa Sub-Division, PHE Dte. (Period:- 01/03/2025 to 31/08/2025) [Sl No-02] Assistant Engineer JUNIOR ENGINEER KATWA SUB-DIVISION PHE DTE ORD/001324/2024-2025 321/KTS 28/02/2025 184 HAMID SK 1.84 0.00 0 0
1804 PURBA BARDHAMAN Ketugram-I Burdwan Division ARGUN PIPED WATER SUPPLY SCHEME , SM/16482 New Road crossing through metal / concrete road by Jack Push Method for AMEGERIA (SM/16023), ARGUN (SM/16482), CHINISPUR (SM/15170) and KULITIA (SM/15167) PWSS under Ketugram I Development Block under Katwa Sub Division within Burdwan Division, PHE. Dte. Assistant Engineer JUNIOR ENGINEER R.W.S. BURDWAN SUB-DIVISION PHE DTE ORD/001311/2024-2025 977/BWD 13/03/2025 60 M/S GOUTAM DAS 39.22 0.00 0 100
1805 PURBA BARDHAMAN Manteswar Burdwan Division KHANPUR PIPED WATER SUPPLY SCHEME , SM/16540 New Material Requisition To Resource Division RTOR000381/2023-2024 2197/BWD 12/05/2023 0 Resource Division 11.22 0.00 0 0
1806 PURBA BARDHAMAN Manteswar Burdwan Division KHANPUR PIPED WATER SUPPLY SCHEME , SM/16540 New Material Requisition To Resource Division RTOR000531/2023-2024 4293/BWD 29/09/2023 0 Resource Division 2.89 0.00 0 0
1807 PURBA BARDHAMAN Manteswar Burdwan Division KHANPUR PIPED WATER SUPPLY SCHEME , SM/16540 New Material Requisition To Resource Division RTOR000558/2023-2024 4934/BWD 10/11/2023 0 Resource Division 67.03 0.00 0 0
1808 PURBA BARDHAMAN Manteswar Central Mechanical KHANPUR PIPED WATER SUPPLY SCHEME , SM/16540 New NEW SERVICE CONNECTION FOR KHANPUR PWSS. BILL/02687/2023-2024 BP-2023-24-562 23/02/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 5.01 0.00 0 0
1809 PURBA BARDHAMAN Manteswar Central Mechanical KHANPUR PIPED WATER SUPPLY SCHEME , SM/16540 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1, 2 & 3 at KHANPUR Water Supply Scheme [ Block-MONTESWAR] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000799/2023-2024 4086/CMD 29/08/2023 30 S DUTTA 43.47 0.00 0 65
1810 PURBA BARDHAMAN Manteswar Burdwan Division KHANPUR PIPED WATER SUPPLY SCHEME , SM/16540 New KHANPUR Piped Water Supply Scheme with sinking of Tube-well, LDS, Rising Main, FHTC, Construction of 400 cum capacity RCC OHR with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drain and internal pathway at different TW site under Monteswar Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte JUNIOR ENGINEER DURGAPUR SUB-DIVISION PHE DTE ORD/000803/2023-2024 4808/BWD 08/11/2023 723 NATIONAL CONSTRUCTION 707.70 0.00 0 60
1811 PURBA BARDHAMAN Manteswar Central Mechanical KHANPUR PIPED WATER SUPPLY SCHEME , SM/16540 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Sutra & others water supply scheme under Monteswar Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000068/2024-2025 2396/CMD 02/08/2024 455 SINHA ELECTRICALS 78.06 0.00 0 20
1812 PURBA BARDHAMAN Manteswar Burdwan Division KHANPUR PIPED WATER SUPPLY SCHEME , SM/16540 New Mutation of Departmental Land use in various PWSS (Existing & New) under JJM of Bhatar, Khandaghosh and Manteswar Block under Duragapur (Burdwan North) Sub-Division, P.H.E. DTE. Junior Engineer1, Durgapur Sub-Division, PHE Dte. ORD/000237/2025-2026 661/DSD 30/04/2025 365 SHUBHRA KANTI GHOSH 0.47 0.00 0 70
1813 PURBA BARDHAMAN Manteswar Central Mechanical KHANPUR PIPED WATER SUPPLY SCHEME , SM/16540 New CONTINUATION OREDER- Hiring of inspection vehicle no. [ WB41H5741] (Diesel/CNG/LPG Driven) for supervision of the site for the office of the Assistant Engineer ,CMD PHE Dte. [W.E.F- 01.08.2025 to 30.09.2025] ASSISTANT ENGINEER Junior Engineer ORD/000131/2025-2026 1035/CMSD 30/07/2025 61 PRODYUT GHOSH 0.80 0.00 0 0
1814 PURBA BARDHAMAN Central Mechanical AUGMENTATION OF KALYANPUR PIPED WATER SUPPLY SCHEME , SM/16299 Augmentation NEW SERVICE CONNECTION FOR AUGMENTATION FOR KALYANPUR PWSS PH-2 BILL/00186/2024-2025 BP-2024-25-87 15/05/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 5.96 0.00 0 0
1815 PURBA BARDHAMAN Central Mechanical AUGMENTATION OF KALYANPUR PIPED WATER SUPPLY SCHEME , SM/16299 Augmentation Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination system and internal House wiring for Tube well no.- 1 & 2 at Augmentation of KALYANPUR[KALNA-II] Water Supply Scheme under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/001079/2023-2024 4438/CMD 01/11/2023 760 SOUNAK ENTERPRISE 24.41 9.51 38.96 50
1816 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF KALYANPUR PIPED WATER SUPPLY SCHEME , SM/16299 Augmentation Different types of works involve in connection with Augmentation of KALYANPUR (SM/16299) Water Supply Scheme & BHABANANDAPUR (SM/16024) Water Supply Scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer JUNIOR ENGINEER RWS KALNA2 ORD/000189/2024-2025 2433/BWD 27/06/2024 247 BALAJEE ENTERPRISES 225.16 109.26 48.53 2
1817 PURBA BARDHAMAN Purbasthali-I Burdwan Division GAHAK PIPE WATER SUPPLY SCHEME , SM/16303 New Material Requisition To Resource Division RTOR000252/2023-2024 2197/BWD 12/05/2023 0 Resource Division 7.50 0.00 0 0
1818 PURBA BARDHAMAN Purbasthali-I Burdwan Division GAHAK PIPE WATER SUPPLY SCHEME , SM/16303 New Material Requisition To Resource Division RTOR000591/2023-2024 4899/BWD 10/11/2023 0 Resource Division 15.99 0.00 0 0
1819 PURBA BARDHAMAN Purbasthali-I Burdwan Division GAHAK PIPE WATER SUPPLY SCHEME , SM/16303 New Material Requisition To Resource Division RTOR000548/2023-2024 4308/BWD 29/09/2023 0 Resource Division 0.81 0.00 0 0
1820 PURBA BARDHAMAN Purbasthali-I Burdwan Division GAHAK PIPE WATER SUPPLY SCHEME , SM/16303 New Work Order for "CONSTRUCTION OF TEMPORARY KIOSK FOR THE NECESSARY ARRANGEMENT OF ELECTRIFICATION OF TUBEWELL FOR GAHAK PWSS UNDER KALNA SUB-DIVISION UNDER BURDWAN DIVISION, PHE DTE." Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000571/2024-2025 1017/KSD 07/08/2024 15 DEL DELTA CONSTRUCTION 0.66 0.66 100 100
1821 PURBA BARDHAMAN Purbasthali-I Central Mechanical GAHAK PIPE WATER SUPPLY SCHEME , SM/16303 New New service connection for Gahak PWSS TW-2. BILL/02392/2023-2024 BP-2023-24-498 06/02/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 5.70 0.00 0 0
1822 PURBA BARDHAMAN Purbasthali-I Central Mechanical GAHAK PIPE WATER SUPPLY SCHEME , SM/16303 New New service connection for Gahak PWSS TW-1. BILL/02393/2023-2024 BP-2023-24-497 06/02/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.70 0.00 0 0
1823 PURBA BARDHAMAN Purbasthali-I Central Mechanical GAHAK PIPE WATER SUPPLY SCHEME , SM/16303 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at GAHAK Water Supply Scheme [ Block- PURBASTHALI -1 ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. [3rd CALL] ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000929/2023-2024 4192/CMD 29/08/2023 30 SOUNAK ENTERPRISE 21.33 0.00 0 50
1824 PURBA BARDHAMAN Purbasthali-I Burdwan Division GAHAK PIPE WATER SUPPLY SCHEME , SM/16303 New Different works related (sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of different capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site) to SHYAMPUR, GAHAK & SHANKRA Piped Water Supply Scheme under Purbasthali I Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000639/2023-2024 3957/BWD 07/09/2023 1051 M/S B. NANDI 758.52 92.60 12.21 20
1825 PURBA BARDHAMAN Purbasthali-I Central Mechanical GAHAK PIPE WATER SUPPLY SCHEME , SM/16303 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Manganpur & others water supply scheme under Purbasthali 1 Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000714/2024-2025 2979/CMD 25/11/2024 90 H.K. DAS & CO. 53.27 0.00 0 0
1826 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF KULTI PIPED WATER SUPPLY SCHEME , SM/16301 Augmentation Augmentation of KULTI PWSS to accommodate FHTC, Laying Distribution System, Laying Rising Main, under Jal Jeevan Mission of Kalna - II Block, Purba Burdwan District under Burdwan Division, PHE.Dte. ORD/000588/2023-2024 3747/BWD 28/08/2023 60 MAHALAXMI CONSTRUCTION 21.92 0.00 0 0
1827 PURBA BARDHAMAN Central Mechanical AUGMENTATION OF KULTI PIPED WATER SUPPLY SCHEME , SM/16301 Augmentation Additional Quotation for augmentation of Kulti PWSS PH 3 BILL/00938/2024-2025 BP-2024-25-407 11/12/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 1.79 0.00 0 0
1828 PURBA BARDHAMAN Central Mechanical AUGMENTATION OF KULTI PIPED WATER SUPPLY SCHEME , SM/16301 Augmentation New service connection for augmentation of Kulti PH-3 PWSS. BILL/00086/2024-2025 BP-2024-25-29 19/04/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 4.70 0.00 0 0
1829 PURBA BARDHAMAN Central Mechanical AUGMENTATION OF KULTI PIPED WATER SUPPLY SCHEME , SM/16301 Augmentation Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination system and internal House wiring for Tube well no.- 1, 2 & 3 at Augmentation of KULTI[KALNA-II]] Water Supply Scheme under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER Junior Engineer ORD/001081/2023-2024 4439/CMD 04/10/2023 698 CHOUDHURY ENTERPRISE 36.64 0.00 0 33
1830 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF KULTI PIPED WATER SUPPLY SCHEME , SM/16301 Augmentation Different types of works involve in connection with Augmentation of KULTI (SM/16301) Water Supply Scheme, Block Kalna II under Burdwan Division, PHE Dte. Assistant Engineer JUNIOR ENGINEER RWS KALNA2 ORD/000235/2024-2025 2553/BWD 04/07/2024 240 HAMID SK 222.11 83.72 37.69 80
1831 PURBA BARDHAMAN Central Mechanical AUGMENTATION OF KULTI PIPED WATER SUPPLY SCHEME , SM/16301 Augmentation Illumination arrangement at Kulti water supply scheme under Kalna 2 Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000407/2024-2025 2787/CMD 01/10/2024 334 DELTA ENGINEERING ENTERPRISE 10.70 0.00 0 30
1832 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR PALLA , SM/16192 Augmentation Sinking of 300 X 200mm dia Tube Well 150 mtr. Depth by D.R. Rig method using UPVC pipe (CD) and UPVC Deep Well Screen (RDS) for 3RD TW site of PALLA W/S Scheme under Memari - I Block within Burdwan Sub-Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000203/2023-2024 2706/BWD 08/06/2023 30 DAS CONSTRUCTION 13.26 11.91 89.82 100
1833 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR PALLA , SM/16192 Augmentation Preparation and Submission of DPR for Augmentation of Palla PWSS under Memari-I Development Block under Burdwan Division, P.H.E Dte.[2nd Call] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000397/2023-2024 1585/BSD 24/07/2023 15 MEASURE LAND 0.78 0.77 98.72 100
1834 PURBA BARDHAMAN Central Mechanical AUGMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR PALLA , SM/16192 Augmentation Illumination arrangement & different electro-mechanical works at PALLA and others water supply scheme under Memari-I Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. ASSISTANT ENGINEER Junior Engineer ORD/000441/2024-2025 2798/CMD 01/10/2024 60 SUBRATA BHADRA 15.45 0.00 0 0
1835 PURBA BARDHAMAN Central Mechanical AUGMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR PALLA , SM/16192 Augmentation Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination system and internal House wiring for Tube well no.- 1 at Augmentation of PALLA[MEMARI-I] Water Supply Scheme under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER Junior Engineer ORD/000573/2023-2024 3903/CMD 18/08/2023 30 SIMARR 11.88 11.53 97.05 100
1836 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR PALLA , SM/16192 Augmentation Construction of switch rooms & Rising main at different TW site for PALLA Piped Water Supply Scheme under Memari - I Block, District:- Purba-Bardhaman under Burdwan Division, PHE. Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. Junior Engineer, RWS, Memari-I Dev. Bolck ORD/000592/2023-2024 3765/BWD 29/08/2023 60 SANDIP SARKAR 7.52 5.87 78.06 98
1837 PURBA BARDHAMAN Central Mechanical AUGMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR PALLA , SM/16192 Augmentation Supply & installation of Automatic Chlorinator at Palla water supply scheme, P.H. No.- II under CMD, P.H.E. Dte., Dist.- Purba Bardhaman. ASSISTANT ENGINEER Junior Engineer ORD/000243/2024-2025 726/CMSD 10/05/2024 10 MITRA ENTERPRISE 0.96 0.00 0 100
1838 PURBA BARDHAMAN Central Mechanical AUGMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR PALLA , SM/16192 Augmentation NEW SERVICE CONNECTION FOR PALLA PWSS BILL/02597/2023-2024 BP-2023-24-553 20/02/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 7.35 0.00 0 0
1839 PURBA BARDHAMAN Central Mechanical AUGMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR PALLA , SM/16192 Augmentation Additional quotation for installation of DTR 25KVA at Palla PWSS PH-2 BILL/00441/2024-2025 BP-2024-25-235 30/07/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 4.51 0.00 0 0
1840 PURBA BARDHAMAN Raina-I Burdwan Division NETRAKHANDA PIPED WATER SUPPLY SCHEME , SM/16616 New Material Requisition To Resource Division RTOR000355/2023-2024 2197/BWD 12/05/2023 0 Resource Division 7.53 0.00 0 0
1841 PURBA BARDHAMAN Raina-I Burdwan Division NETRAKHANDA PIPED WATER SUPPLY SCHEME , SM/16616 New Material Requisition To Resource Division RTOR000682/2023-2024 5055/BWD 23/11/2023 0 Resource Division 20.46 0.00 0 0
1842 PURBA BARDHAMAN Raina-I Burdwan Division NETRAKHANDA PIPED WATER SUPPLY SCHEME , SM/16616 New Material Requisition To Resource Division RTOR000524/2023-2024 4290/BWD 29/09/2023 0 Resource Division 2.08 0.00 0 0
1843 PURBA BARDHAMAN Raina-I Burdwan Division NETRAKHANDA PIPED WATER SUPPLY SCHEME , SM/16616 New NETRAKHANDA Piped Water Supply Scheme with sinking of Tube-well, LDS, Rising Main, FHTC, Construction of 200 cum capacity RCC OHR with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drain and internal pathway at different TW site under Raina-I Block, District:- Purba-Bardhaman [NEW SCHEME]_2ND CALL Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000660/2023-2024 4121/BWD 14/09/2023 365 SUJAY KUMAR RAY 345.67 23.33 6.75 50
1844 PURBA BARDHAMAN Raina-I Central Mechanical NETRAKHANDA PIPED WATER SUPPLY SCHEME , SM/16616 New New Service connection for Netrakahanda W/S Scheme PH No.-I BILL/01802/2023-2024 BP-2023-24-319 30/12/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 6.70 0.00 0 0
1845 PURBA BARDHAMAN Raina-I Central Mechanical NETRAKHANDA PIPED WATER SUPPLY SCHEME , SM/16616 New New Service connection for Netrakhanda W/S Scheme PH No.-II BILL/01801/2023-2024 BP-2023-24-320 30/12/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.85 0.00 0 0
1846 PURBA BARDHAMAN Raina-I Central Mechanical NETRAKHANDA PIPED WATER SUPPLY SCHEME , SM/16616 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at Netrakhanda Water Supply Scheme [ Block- Raina-1 ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000722/2023-2024 4033/CMD 29/08/2023 30 GLACIER ENGINEERING CO 28.97 0.00 0 96
1847 PURBA BARDHAMAN Raina-I Central Mechanical NETRAKHANDA PIPED WATER SUPPLY SCHEME , SM/16616 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Bajitpur, Belsar & other water supply scheme under Raina-1 Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000117/2024-2025 2589/CMD 27/08/2024 90 DEY ENTERPRISE 74.58 0.00 0 10
1848 PURBA BARDHAMAN Central Mechanical AUGMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR PALASAN , SM/15723 Augmentation Installation of a voltage Correcting device along with allied accessories at PALASAN Water Supply Scheme, Pump House-1, under CMD, PHE Dte., Dist.- Paschim-Bardhaman. ORD/000948/2022-2023 1160/CMD 13/03/2023 30 P.K. ENGINEERING 2.98 2.98 100 0
1849 PURBA BARDHAMAN Central Mechanical AUGMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR PALASAN , SM/15723 Augmentation Supply & Installation of Submersible Pumping Machinery , Voltage Stabilizer, Chlorination system and internal House wiring for Tube well no.- 1 at Augumentation of Palasan Water Supply Scheme under CMD, PHE Dte., Dist.- Purba-Bardhaman. [2nd CALL] ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000206/2023-2024 3047/CMD 20/07/2023 30 S.K. ELECTRICALS 11.09 10.23 92.25 80
1850 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR PALASAN , SM/15723 Augmentation Sinking of 300 X 200mm dia Tube Well 150 mtr. Depth by D.R. Rig method using UPVC pipe (CM) and UPVC Deep Well Screen (RMS) for Augmentation of PALASON & its adjoining mouzas Piped Water Supply Scheme, Block - Raina - I, Dist - Purba Bardhaman under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000515/2022-2023 4612/BWD 17/10/2022 30 M/S SYCHROTECH INDUSTRY 10.12 8.33 82.31 0
1851 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR PALASAN , SM/15723 Augmentation Construction of Pump House cum chlorine room without sanitary and water supply arrangement at Tube Well Site to departmental drawing no-PHE/BD/P.H/DRG/02/DEC-17(Size 3.60 mtr x 3.00 mtr room) for PALASON its Adjoining Mouza W/S Scheme, Block - Raina-I within Burdwan Sub-Division, PHE Dte. (Mouza- PASCHIM PARA) Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000765/2022-2023 497/BSD 21/03/2023 45 MAA MAHAMAYA CONSTRUCTION 3.63 3.32 91.46 100
1852 PURBA BARDHAMAN Central Mechanical AUGMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR PALASAN , SM/15723 Augmentation New Service Connection Charges Bill for TW-3 of Aug. Palasan W/S Scheme BILL/00571/2023-2024 BP-2023-24-7 08/05/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 5.39 0.00 0 0
1853 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR PALASAN , SM/15723 Augmentation Extension Pipeline with Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of PALASHAN Piped Water Supply Scheme within Raina I Block of Burdwan Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000001/2023-2024 1601/BWD 04/04/2023 60 BHOWMICK ENTERPRISE 50.14 47.90 95.53 100
1854 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR PALASAN , SM/15723 Augmentation Improvement work of PALASON Piped Water Supply Scheme for smooth running of FHTC within Raina-I block under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/001195/2023-2024 2739/BSD 28/11/2023 30 ANWESHA CONSTRUCTION 0.95 0.94 98.95 100
1855 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR PALASAN , SM/15723 Augmentation Laying Parallel Pipeline to improve drinking water supply, Construction of Boundary wall, Path Way, Drain at 3rd TW Site and providing leftout FHTC, Road Restoration with allied work for PALASON Piped Water Supply Scheme, Block- Raina-I, within Burdwan Sub Division under Burdwan Division PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000688/2024-2025 3671/BWD 22/10/2024 90 A.K. SIKDAR 42.74 0.00 0 0
1856 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR PALASAN , SM/15723 Augmentation Conducting physical Household Survey at the IMIS reported village for HGJ certification and providing balance FHTC for Har Ghar Jal certification including conducting Gram Sabhas for different IMIS reported villages across the district under Burdwan Division, PHE Dte. AE(HQs),Assistant Engineer ,Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE.,Assistant Engineer, Durgapur Sub Division, P.H.E. Dte JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000428/2024-2025 3107/BWD 12/08/2024 323 TUBGRAM GRAMMYAK UNNAYAN SAMITY 309.60 0.00 0 85
1857 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR PALASAN , SM/15723 Augmentation Designing, making and erection of Sign Board for SWAJAL GRAM in Paschimpara village of Raina-I Block under Palashan Piped Water Supply Scheme within Burdwan Sub-Division under Burdwan Division, PHE Dte(5 nos Board) ORD/000514/2025-2026 2355/BSD 21/08/2025 10 S.M. ENGOCON 0.72 0.00 0 0
1858 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR PALASAN , SM/15723 Augmentation Left out FHTC & distribution Networks at Palasan Paschim para under PALASAN Piped Water Supply Scheme, Block- RAINA-I within Burdwan Sub-Division under Burdwan Division PHE Dte. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000781/2025-2026 1471/BSD 25/06/2025 30 SK ABDUL HALIM 1.97 0.00 0 0
1859 PURBA BARDHAMAN Ketugram-I Burdwan Division BAKALSA PIPE WATER SUPPLY SCHEME , SM/16030 New Material Requisition To Resource Division RTOR000221/2023-2024 2155/BWD 10/05/2023 0 Resource Division 12.89 0.00 0 0
1860 PURBA BARDHAMAN Ketugram-I Central Mechanical BAKALSA PIPE WATER SUPPLY SCHEME , SM/16030 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at BAKALSA Water Supply Scheme [ Block- KETUGRAM-1 ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. [2nd CALL] Driller In-Charge JUNIOR ENGINEER ORD/000928/2023-2024 4191/CMD 29/08/2023 485 MITRA ASSOCIATE 20.63 9.43 45.71 44
1861 PURBA BARDHAMAN Ketugram-I Burdwan Division BAKALSA PIPE WATER SUPPLY SCHEME , SM/16030 New BAKALSA Piped Water Supply Scheme with sinking of Tube-well, LDS, Rising Main, FHTC, Construction of switch rooms & boundary walls with gates and land development, drain and internal pathway at different TW site under KETUGRAM -I Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer JUNIOR ENGINEER R.W.S. BURDWAN SUB-DIVISION PHE DTE ORD/000131/2024-2025 2065/BWD 07/06/2024 120 JAHAR GHOSH 94.85 60.94 64.25 70
1862 PURBA BARDHAMAN Ketugram-I Central Mechanical BAKALSA PIPE WATER SUPPLY SCHEME , SM/16030 New New service connection charges for Bakalsa PWSS TW-1 BILL/00829/2024-2025 BP-2024-25-322 03/10/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.62 0.00 0 0
1863 PURBA BARDHAMAN Ketugram-I Central Mechanical BAKALSA PIPE WATER SUPPLY SCHEME , SM/16030 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at Bakalsa Water Supply Scheme [ Block- Burdwan-1 ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER Junior Engineer ORD/000905/2023-2024 4169/CMD 29/08/2023 580 M/S, S.DAS AND ENTERPRISE. 29.71 14.94 50.29 50
1864 PURBA BARDHAMAN Ketugram-I Burdwan Division BAKALSA PIPE WATER SUPPLY SCHEME , SM/16030 New Balance Work For OHR, Extension Of Pipeline To Provide FHTC With Sinking Of Tube Well, Construction Of Pump House, Boundary Wall, Land Development, Plinth Protection For Pump House, Approach Road & Other Related Work Under Bakalsa, Chakdaha, Ehaipur, Khatundi And Ketugram (Zone-I) Part-A & B PWSS Under Katwa Sub Division, Block- Ketugram-I, Burdwan Division PHE Dte. Assistant Engineer JUNIOR ENGINEER R.W.S. BURDWAN SUB-DIVISION PHE DTE ORD/000288/2024-2025 2741/BWD 12/07/2024 415 M/S M.M. ENTERPRISE 205.15 6.49 3.16 65
1865 PURBA BARDHAMAN Ketugram-II Central Mechanical KANKURHATI PIPED WATER SUPPLY SCHEME , SM/16031 New Supply & Installation of Submersible Pumping Machinery , Voltage Stabilizer, Chlorination system and internal House wiring for Tube well no.- 1 & 2 at KANKURHATI [KETUGRAM-II] Water Supply Scheme under CMD, PHE Dte., Dist.- Purba-Bardhaman. Driller In-Charge Junior Engineer ORD/000058/2023-2024 2519/CMD 02/06/2023 30 P.K. ENGINEERING 21.26 9.52 44.78 40
1866 PURBA BARDHAMAN Ketugram-II Burdwan Division KANKURHATI PIPED WATER SUPPLY SCHEME , SM/16031 New Material Requisition To Resource Division RTOR000007/2023-2024 1962/BWD 25/04/2023 0 Resource Division 0.87 0.00 0 0
1867 PURBA BARDHAMAN Ketugram-II Burdwan Division KANKURHATI PIPED WATER SUPPLY SCHEME , SM/16031 New Material Requisition To Resource Division RTOR000164/2023-2024 2155/BWD 10/05/2023 0 Resource Division 21.70 0.00 0 0
1868 PURBA BARDHAMAN Ketugram-II Burdwan Division KANKURHATI PIPED WATER SUPPLY SCHEME , SM/16031 New Material Requisition To Resource Division RTOR000564/2023-2024 4938/BWD 10/11/2023 0 Resource Division 0.73 0.00 0 0
1869 PURBA BARDHAMAN Ketugram-II Central Mechanical KANKURHATI PIPED WATER SUPPLY SCHEME , SM/16031 New New service connection charges for Kankurhati W/S Scheme TW-1 BILL/00682/2023-2024 BP-2023-24-28 22/06/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.49 0.00 0 0
1870 PURBA BARDHAMAN Ketugram-II Central Mechanical KANKURHATI PIPED WATER SUPPLY SCHEME , SM/16031 New New service connection charges for Kankurhati PWSS TW-2 BILL/01129/2024-2025 BP-2023-24-406 04/12/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 5.45 0.00 0 0
1871 PURBA BARDHAMAN Ketugram-II Burdwan Division KANKURHATI PIPED WATER SUPPLY SCHEME , SM/16031 New KANKURHATI Piped Water Supply Scheme with sinking of Tube-well, LDS, Rising Main, FHTC, & construction of switch rooms & boundary walls with gates and land development, drain and internal pathway at KANKURHATI Mouza (J.L. - 120) under KETUGRAM -II Block, District:- Purba-Bardhaman [NEW SCHEME]. Assistant Engineer JUNIOR ENGINEER R.W.S. BURDWAN SUB-DIVISION PHE DTE ORD/000791/2022-2023 1428/BWD 24/03/2023 648 HAMID SK 77.54 54.70 70.54 100
1872 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED SAGRAI PWSS (PART B) , SM/16774 Augmentation Construction of Pump House cum chlorine room without sanitary and water supply arrangement at Tube Well Site to departmental drawing no-PHE/BD/P.H/DRG/02/DEC-17(Size 3.60 mtr x 3.00 mtr room) for SAGRAI its Adjoining Mouza W/S Scheme, Block -Khandaghosh within Burdwan Sub-Division, PHE Dte. (Mouza- Jubila) ORD/000769/2022-2023 504/BSD 21/03/2023 45 JYOTI ENTERPRISE 3.50 2.76 78.86 100
1873 PURBA BARDHAMAN Central Mechanical AUGMENTATION OF GROUND WATER BASED SAGRAI PWSS (PART B) , SM/16774 Augmentation New service connection charges for Sagrai W/S Scheme TW-3 BILL/00685/2023-2024 BP-2023-24-27 22/06/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 2.31 0.00 0 0
1874 PURBA BARDHAMAN Central Mechanical AUGMENTATION OF GROUND WATER BASED SAGRAI PWSS (PART B) , SM/16774 Augmentation Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination system and internal House wiring for Tube well no.- 1 & 2 at Augmentation of SAGRAI(Part-B)[KHANDAGHOSH] Water Supply Scheme under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER Junior Engineer ORD/000572/2023-2024 3898/CMD 18/08/2023 30 M/S, S.S. ENTERPRISE. 24.41 11.98 49.08 40
1875 PURBA BARDHAMAN Central Mechanical AUGMENTATION OF GROUND WATER BASED SAGRAI PWSS (PART B) , SM/16774 Augmentation Illumination arrangement & different electro-mechanical works at SAGRAI water supply scheme under KHANDAGHOSH Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. ASSISTANT ENGINEER Junior Engineer ORD/000416/2024-2025 2800/CMD 01/10/2024 60 CHOUDHURY ENTERPRISE 14.29 0.00 0 0
1876 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED SAGRAI PWSS (PART B) , SM/16774 Augmentation Sinking of 300 X 200mm dia Tube Well 150 mtr. Depth by D.R. Rig method using UPVC pipe (CD) and UPVC Deep Well Screen (RDS) for Aug. of SAGRAI W/S Scheme (2ND TW SITE) under Khandaghosh Block within Burdwan Sub-Division, PHE Dte. [For 01 No. Tube well]. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000191/2023-2024 2688/BWD 08/06/2023 30 NATIONAL CONSTRUCTION 13.23 10.23 77.32 100
1877 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED SAGRAI PWSS (PART B) , SM/16774 Augmentation Designing, Making and Erection of Sign Board for SAJAL GRAM in Sagrai Village, Khandaghosh Block within Sagrai PWSS under Burdwan Division, PHE Dte. (5 Nos Board) AE(HQs) J.E. 1 BURDWAN ORD/000737/2023-2024 830/AE/HQ 30/10/2023 30 ISHAN CONSTRUCTION 0.76 0.72 94.74 100
1878 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED SAGRAI PWSS (PART B) , SM/16774 Augmentation Repairing damaged concrete road by cement concrete (mix 1:1.5:3) for FHTC work for SAGRAI Piped W/S. Scheme and its adj. mouzas within Khandaghosh Block under Burdwan Division PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/001056/2023-2024 895/BWD 01/03/2024 30 SK KHAIRUL ISLAM 8.78 8.71 99.2 100
1879 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED SAGRAI PWSS (PART B) , SM/16774 Augmentation Laying of Rising main in between 3rd Tube Wells to 125 mm dia distribution pipe line at Chatimpur village for SAGRAI Pipe Water Supply scheme in Khandaghosh Block under Burdwan Sub-Division under Burdwan Division, P.H.E. Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/001091/2023-2024 516/BSD 13/03/2024 30 SHANKHA GHOSH 0.97 0.91 93.81 100
1880 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED SAGRAI PWSS (PART B) , SM/16774 Augmentation Restore of Pipeline damaded by construction of drain by Zilla Parishad near Jobila Muslimpara under SAGRAI Piped Water Supply Scheme, Block- Khandaghosh within Burdwan Sub Division under Burdwan Division PHE Dte Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/001027/2023-2024 278/BSD 09/02/2024 30 SHUBHRA KANTI GHOSH 0.96 0.40 41.67 100
1881 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED SAGRAI PWSS (PART B) , SM/16774 Augmentation Restore of Pipeline damaged by construction of drain by Zilla Parishad near Jobila Sarkarpara under SAGRAI Piped Water Supply Scheme, Block- Khandaghosh within Burdwan Sub Division under Burdwan Division PHE Dte Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/001172/2023-2024 531/BSD 14/03/2024 30 SHUBHRA KANTI GHOSH 0.96 0.58 60.42 100
1882 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED SAGRAI PWSS (PART B) , SM/16774 Augmentation Restore of Pipeline damaded by construction of drain by Zilla Parishad near Jobila F.P.School & Peer Tala & Chatimpur under SAGRAI Piped Water Supply Scheme, Block- Khandaghosh within Burdwan Sub Division under Burdwan Division PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/001177/2023-2024 534/BSD 14/03/2024 30 SHUBHRA KANTI GHOSH 0.94 0.00 0 100
1883 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED SAGRAI PWSS (PART B) , SM/16774 Augmentation Shifting of pipeline of 160mm & 90mm HDPE pipeline for Irrigation canel crossing and special maintenance for FHTC work for Sagrai & Khandaghosh Piped Water Supply Scheme within Khandaghosh block under Burdwan Division, PHE Dte. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000127/2024-2025 1008/BSD 06/06/2024 30 SHUBHRA KANTI GHOSH 0.86 0.86 100 100
1884 PURBA BARDHAMAN Central Mechanical AUGMENTATION OF GROUND WATER BASED SAGRAI PWSS (PART B) , SM/16774 Augmentation Quotation for new service connection for Sagrai PWSS TW-4. BILL/00256/2024-2025 BP-2024-25-135 05/06/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.68 0.00 0 0
1885 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED SAGRAI PWSS (PART B) , SM/16774 Augmentation Repairing damaged concrete road by Cement concrete (mix 1:1.5:3) and drainage system, Sluice valve chamber for FHTC work for KHANDAGHOSH, TARAPOSH, SAGRAI, SANKARI, KHUDKURI, ONARI PWSS and its adjoining mouzas within KHANDAGHOSH BLOCK under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000689/2024-2025 3684/BWD 23/10/2024 90 SUPRIYA RAY 115.68 0.00 0 20
1886 PURBA BARDHAMAN Memari-I Central Mechanical AMADPUR PIPED WATER SUPPLY SCHEME , SM/18146 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination system and internal House wiring for new Tube well no.- 1 & 2 of AMADPUR[MEMARI-I] Water Supply Scheme under CMD, PHE Dte., Dist.- Purba-Bardhaman. ORD/001089/2023-2024 4511/CMD 06/10/2023 30 AMUSAR IMPEX PVT. LTD. 25.20 0.00 0 0
1887 PURBA BARDHAMAN Memari-I Burdwan Division AMADPUR PIPED WATER SUPPLY SCHEME , SM/18146 New AMADPUR Piped Water Supply Scheme with sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of 200 cum capacity RCC OHRs with 20.0 mtr. Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site under MEMARI-I Block, District:- Purba Bardhaman [NEW SCHEME] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000569/2023-2024 4123/BWD 14/09/2023 365 SUPRIYA RAY 313.65 98.51 31.41 40
1888 PURBA BARDHAMAN Memari-I Central Mechanical AMADPUR PIPED WATER SUPPLY SCHEME , SM/18146 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at SAHAPUR & others water supply scheme under Memari-I Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. ASSISTANT ENGINEER Junior Engineer ORD/000100/2024-2025 2392/CMD 02/08/2024 90 MITRA ENTERPRISE 47.62 0.00 0 0
1889 PURBA BARDHAMAN Memari-I Central Mechanical AMADPUR PIPED WATER SUPPLY SCHEME , SM/18146 New New service connection for Amadpur W/S Scheme. BILL/02187/2023-2024 BP-2023-24-383 16/01/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 5.47 0.00 0 0
1890 PURBA BARDHAMAN Memari-I Central Mechanical AMADPUR PIPED WATER SUPPLY SCHEME , SM/18146 New New service connection for Amadpur W/S Scheme. BILL/02188/2023-2024 BP-2023-24-382 16/01/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.69 0.00 0 0
1891 PURBA BARDHAMAN Bhatar Central Mechanical PASHALA PIPED WATER SUPPLY SCHEME , SM/15245 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at PASHALA Water Supply Scheme [ Block-BHATAR ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000777/2023-2024 4071/CMD 29/08/2023 30 SOUNAK ENTERPRISE 27.79 0.00 0 0
1892 PURBA BARDHAMAN Bhatar Burdwan Division PASHALA PIPED WATER SUPPLY SCHEME , SM/15245 New Material Requisition To Resource Division RTOR000080/2023-2024 1962/BWD 25/04/2023 0 Resource Division 0.33 0.00 0 0
1893 PURBA BARDHAMAN Bhatar Burdwan Division PASHALA PIPED WATER SUPPLY SCHEME , SM/15245 New Material Requisition To Resource Division RTOR000367/2023-2024 2197/BWD 12/05/2023 0 Resource Division 4.80 0.00 0 0
1894 PURBA BARDHAMAN Bhatar Burdwan Division PASHALA PIPED WATER SUPPLY SCHEME , SM/15245 New Material Requisition To Resource Division RTOR000757/2023-2024 5242/BWD 30/11/2023 0 Resource Division 18.50 0.00 0 0
1895 PURBA BARDHAMAN Bhatar Central Mechanical PASHALA PIPED WATER SUPPLY SCHEME , SM/15245 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Karjana & others water supply scheme under Bhatar Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000067/2024-2025 2394/CMD 02/08/2024 90 AHALYA ENGINEERING WORKS 82.00 0.00 0 0
1896 PURBA BARDHAMAN Bhatar Central Mechanical PASHALA PIPED WATER SUPPLY SCHEME , SM/15245 New NEW SERVICE CONNECTION FOR PASHALA PWSS BILL/02594/2023-2024 BP-2023-24-550 20/02/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 4.16 0.00 0 0
1897 PURBA BARDHAMAN Bhatar Central Mechanical PASHALA PIPED WATER SUPPLY SCHEME , SM/15245 New NEW SERVICE CONNECTION FOR PASHALA PWSS BILL/02595/2023-2024 BP-2023-24-549 20/02/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 14.97 0.00 0 0
1898 PURBA BARDHAMAN Bhatar Burdwan Division PASHALA PIPED WATER SUPPLY SCHEME , SM/15245 New Different works related (sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of different capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site) to NABASTA, PASHALA & POALKURA Piped Water Supply Scheme under Bhatar Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer1, Durgapur Sub-Division, PHE Dte.,Junior Engineer2, Durgapur Sub-Division, PHE Dte. ORD/000739/2023-2024 4652/BWD 31/10/2023 702 STARCO CONSTRUCTIONS 900.17 9.61 1.07 2
1899 PURBA BARDHAMAN Katwa-I Burdwan Division GUSUMBA PIPED WATER SUPPLY SCHEME , SM/18441 New Material Requisition To Resource Division RTOR000271/2023-2024 2197/BWD 12/05/2023 0 Resource Division 13.48 0.00 0 0
1900 PURBA BARDHAMAN Katwa-I Burdwan Division GUSUMBA PIPED WATER SUPPLY SCHEME , SM/18441 New Material Requisition To Resource Division RTOR000539/2023-2024 4306/BWD 29/09/2023 0 Resource Division 72.67 0.00 0 0
1901 PURBA BARDHAMAN Katwa-I Central Mechanical GUSUMBA PIPED WATER SUPPLY SCHEME , SM/18441 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1, 2 & 3 at GUSUMBA Water Supply Scheme [ Block- KATWA-1 ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. Driller In-Charge Junior Engineer ORD/000863/2023-2024 4130/CMD 29/08/2023 30 S.P. CONSTRUCTION 44.39 19.57 44.09 31
1902 PURBA BARDHAMAN Katwa-I Central Mechanical GUSUMBA PIPED WATER SUPPLY SCHEME , SM/18441 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Jajigram & others water supply scheme under Katwa-I Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman Driller In-Charge Junior Engineer ORD/000069/2024-2025 2399/CMD 02/08/2024 90 SUBRATA BHADRA 55.16 0.00 0 0
1903 PURBA BARDHAMAN Katwa-I Burdwan Division GUSUMBA PIPED WATER SUPPLY SCHEME , SM/18441 New Balance work of OHR, construction concrete Road, Functional Household Tap Connection, Construction of drain, Road restoration etc. for GOSUMBA PWSS, under KATWA-I Block under Katwa Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer ORD/000678/2024-2025 3622/BWD 03/10/2024 90 MA KANKALI ENTERPRISE 67.86 0.00 0 0
1904 PURBA BARDHAMAN Katwa-I Central Mechanical GUSUMBA PIPED WATER SUPPLY SCHEME , SM/18441 New Quotation for new service connection at Gusumba PWSS, PH-2. BILL/00463/2024-2025 BP-2024-25-251 01/08/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.55 0.00 0 0
1905 PURBA BARDHAMAN Katwa-I Central Mechanical GUSUMBA PIPED WATER SUPPLY SCHEME , SM/18441 New NEW SERVICE CONNECTION FOR GUSUMBA PWSS TW -1. BILL/03098/2023-2024 BP-2023-24-638 15/03/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 8.88 0.00 0 0
1906 PURBA BARDHAMAN Katwa-I Central Mechanical GUSUMBA PIPED WATER SUPPLY SCHEME , SM/18441 New NEW SERVICE CONNECTION FOR GUSUMBA PWSS TW-3 BILL/00129/2024-2025 BP-2024-25-60 26/04/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.93 0.00 0 0
1907 PURBA BARDHAMAN Katwa-I Burdwan Division GUSUMBA PIPED WATER SUPPLY SCHEME , SM/18441 New GUSUMBA Piped Water Supply Scheme with sinking of Tube-well, LDS, Rising Main, FHTC, Construction of 600 cum capacity RCC OHR with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drain and internal pathway at different TW site under Katwa-I Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer JUNIOR ENGINEER KATWA SUB-DIVISION PHE DTE ORD/000427/2023-2024 3325/BWD 02/08/2023 791 NATIONAL CONSTRUCTION 766.99 333.72 43.51 48
1908 PURBA BARDHAMAN Katwa-I Burdwan Division BAGHTONA PIPED WATER SUPPLY SCHEME , SM/18334 New Material Requisition To Resource Division RTOR000215/2023-2024 2155/BWD 10/05/2023 0 Resource Division 1.33 0.00 0 0
1909 PURBA BARDHAMAN Katwa-I Burdwan Division BAGHTONA PIPED WATER SUPPLY SCHEME , SM/18334 New Material Requisition To Resource Division RTOR000432/2023-2024 3854/BWD 01/09/2023 0 Resource Division 39.78 0.00 0 0
1910 PURBA BARDHAMAN Katwa-I Central Mechanical BAGHTONA PIPED WATER SUPPLY SCHEME , SM/18334 New Additional Quotation for new service connection charges for Baghtona PWSS TW-1 BILL/01421/2023-2024 BP-2023-24-145 31/08/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 2.90 0.00 0 0
1911 PURBA BARDHAMAN Katwa-I Central Mechanical BAGHTONA PIPED WATER SUPPLY SCHEME , SM/18334 New New service connection charges for Baghtona PWSS TW-1 BILL/01422/2023-2024 BP-2023-24-149 01/09/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 0.36 0.00 0 0
1912 PURBA BARDHAMAN Katwa-I Central Mechanical BAGHTONA PIPED WATER SUPPLY SCHEME , SM/18334 New Additional quotation for Baghtona PWSS TW-1 BILL/01543/2023-2024 BP-2023-24-210 01/11/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 0.00 0.00 NAN 0
1913 PURBA BARDHAMAN Katwa-I Burdwan Division BAGHTONA PIPED WATER SUPPLY SCHEME , SM/18334 New Different works related (sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of different capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site) to BAGHTONA, & KASIGRAM Piped Water Supply Scheme under Katwa ¿ I Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer JUNIOR ENGINEER KATWA SUB-DIVISION PHE DTE ORD/000390/2023-2024 3199/BWD 24/07/2023 527 MANASH GHOSH 1,161.82 445.78 38.37 95
1914 PURBA BARDHAMAN Katwa-I Central Mechanical BAGHTONA PIPED WATER SUPPLY SCHEME , SM/18334 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Jajigram & others water supply scheme under Katwa-I Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman Driller In-Charge Junior Engineer ORD/000069/2024-2025 2399/CMD 02/08/2024 90 SUBRATA BHADRA 55.16 0.00 0 0
1915 PURBA BARDHAMAN Katwa-I Burdwan Division BAGHTONA PIPED WATER SUPPLY SCHEME , SM/18334 New Material Requisition To Resource Division RTOR000019/2024-2025 4105/BWD 25/11/2024 0 Resource Division 11.50 0.00 0 0
1916 PURBA BARDHAMAN Katwa-I Central Mechanical BAGHTONA PIPED WATER SUPPLY SCHEME , SM/18334 New NEW SERVICE CONNECTION FOR BAGHTONA PWSS TW-2 BILL/00127/2024-2025 BP-2024-25-61 26/04/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 7.01 0.00 0 0
1917 PURBA BARDHAMAN Katwa-I Central Mechanical BAGHTONA PIPED WATER SUPPLY SCHEME , SM/18334 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at BAGHTONA Water Supply Scheme [ Block- KATWA-I ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER,Driller In-Charge Junior Engineer ORD/000597/2023-2024 3954/CMD 24/08/2023 615 SOUNAK ENTERPRISE 28.48 2.12 7.44 44
1918 PURBA BARDHAMAN Katwa-I Burdwan Division BAGHTONA PIPED WATER SUPPLY SCHEME , SM/18334 New Continuation work order for Supply of 1 (one) No. Diesel driven Ambassador Car (Luxury Taxi) / Motor Cab on hire basis for the Office of the Assistant Engineer, under Katwa Sub-Division within Burdwan Division, P.H.E. Dte. [Period from 01.07.2025 to 31.12.2025]. Assistant Engineer JUNIOR ENGINEER KATWA SUB-DIVISION PHE DTE ORD/000319/2025-2026 1595/KTS 30/06/2025 184 KRISHNA MONDAL 2.40 0.00 0 33
1919 PURBA BARDHAMAN Katwa-I Burdwan Division BAINCHI PIPED WATER SUPPLY SCHEME , SM/18335 New Material Requisition To Resource Division RTOR000219/2023-2024 2155/BWD 10/05/2023 0 Resource Division 13.10 0.00 0 0
1920 PURBA BARDHAMAN Katwa-I Burdwan Division BAINCHI PIPED WATER SUPPLY SCHEME , SM/18335 New Material Requisition To Resource Division RTOR000506/2023-2024 4030/BWD 08/09/2023 0 Resource Division 46.22 0.00 0 0
1921 PURBA BARDHAMAN Katwa-I Central Mechanical BAINCHI PIPED WATER SUPPLY SCHEME , SM/18335 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Jajigram & others water supply scheme under Katwa-I Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman Driller In-Charge Junior Engineer ORD/000069/2024-2025 2399/CMD 02/08/2024 90 SUBRATA BHADRA 55.16 0.00 0 0
1922 PURBA BARDHAMAN Katwa-I Central Mechanical BAINCHI PIPED WATER SUPPLY SCHEME , SM/18335 New New service connection charges for Bainchi PWSS TW-2 BILL/00827/2024-2025 BP-2024-25-324 03/10/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 2.75 0.00 0 0
1923 PURBA BARDHAMAN Katwa-I Central Mechanical BAINCHI PIPED WATER SUPPLY SCHEME , SM/18335 New New service connection charges for Bainchi PWSS TW-1 BILL/00826/2024-2025 BP-2024-25-325 03/10/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 8.89 0.00 0 0
1924 PURBA BARDHAMAN Katwa-I Burdwan Division BAINCHI PIPED WATER SUPPLY SCHEME , SM/18335 New BAINCHI Piped Water Supply Scheme with sinking of Tube-well, LDS, Rising Main, FHTC, Construction of 400 cum capacity RCC OHR with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drain and internal pathway at different TW site under Katwa-I Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer JUNIOR ENGINEER KATWA SUB-DIVISION PHE DTE,Junior Engineer, R.W.S., Katwa-I Dev. Block ORD/000486/2023-2024 3503/BWD 10/08/2023 783 MAA ENGINEERS CO. OPERATIVE & CONSTRUCTION SOCIETY LTD. 521.70 110.59 21.2 75
1925 PURBA BARDHAMAN Katwa-I Central Mechanical BAINCHI PIPED WATER SUPPLY SCHEME , SM/18335 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at BAINCHI Water Supply Scheme [ Block- KATWA-I ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. Driller In-Charge Junior Engineer ORD/000885/2023-2024 4148/CMD 29/08/2023 740 M/S, S.S. ENTERPRISE. 30.35 0.00 0 88
1926 PURBA BARDHAMAN Katwa-I Burdwan Division BAINCHI PIPED WATER SUPPLY SCHEME , SM/18335 New Repairing of pipe line those damaged during flood like situation at Kamal village at Baichi PWSS under Katwa Sub-Division, Block- Katwa - I , Burdwan Division Phe Dte. (Sl No -3) Assistant Engineer Junior Engineer, R.W.S., Katwa-I Dev. Block ORD/001050/2024-2025 1607/KTS 14/11/2024 45 MAA ENGINEERS CO. OPERATIVE & CONSTRUCTION SOCIETY LTD. 0.85 0.00 0 0
1927 PURBA BARDHAMAN Katwa-I Burdwan Division BAINCHI PIPED WATER SUPPLY SCHEME , SM/18335 New Repairing of pipe line those damaged during flood like situation at Chandrapur village at Baichi PWSS under Katwa Sub-Division, Block- Katwa - I , Burdwan Division Phe Dte. (Sl No -2) Assistant Engineer Junior Engineer, R.W.S., Katwa-I Dev. Block ORD/001049/2024-2025 1606/KTS 14/11/2024 45 MAA ENGINEERS CO. OPERATIVE & CONSTRUCTION SOCIETY LTD. 0.86 0.00 0 0
1928 PURBA BARDHAMAN Katwa-I Burdwan Division BAINCHI PIPED WATER SUPPLY SCHEME , SM/18335 New Repairing of pipe line those damaged during flood like situation at Jamra village at Baichi PWSS under Katwa Sub-Division, Block- Katwa - I , Burdwan Division Phe Dte. (Sl No -4) Assistant Engineer Junior Engineer, R.W.S., Katwa-I Dev. Block ORD/001051/2024-2025 1608/KTS 14/11/2024 45 MAA ENGINEERS CO. OPERATIVE & CONSTRUCTION SOCIETY LTD. 0.73 0.00 0 0
1929 PURBA BARDHAMAN Katwa-I Burdwan Division BAINCHI PIPED WATER SUPPLY SCHEME , SM/18335 New Emmergent LDS work for continuation of pipe line between Chandrapur and Kamal by laying of 200 mm dia. Di pipe and other ancillary work under BAINCHI PWSS (SM/18335) under Katwa-I Block, District:- Purba-Bardhaman Assistant Engineer Junior Engineer, R.W.S., Katwa-I Dev. Block ORD/001318/2024-2025 984/BWD 13/03/2025 62 BABLU KUMAR MONDAL 9.24 0.00 0 97
1930 PURBA BARDHAMAN Katwa-I Central Mechanical BAINCHI PIPED WATER SUPPLY SCHEME , SM/18335 New CONTINUATION ORDER-Hiring of inspection vehicle bearing no. WB41H5698 (Diesel/CNG/LPG Driven) for supervision of JJM works under the jurisdiction of the Assistant Engineer, CMSD,P.H.E. Dte. [W.E.F-01/09/2025 TO 31/10/2025 ] ASSISTANT ENGINEER Junior Engineer ORD/000280/2025-2026 1166/CMSD 25/08/2025 61 SUBRATA BHADRA 0.81 0.00 0 0
1931 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED RAINA (PART-B) PWSS TO ACCOMODATE FHTC IN RAINA-I BLOCK WITH IN PURBA BARDHAMAN DISTRICT UNDER BURDWAN DIVISION PHE DTE. , SM/19113 Augmentation Repairing and restore pipe line dammaged by laying of pipeline at different location of Augmentation of RAINA and its adjoining mouza's Piped W/S Scheme at Raina-I Block within Burdwan Sub Division under Burdwan Division, P.H.E. Dte ORD/001001/2023-2024 118/BSD 18/01/2024 30 POMPA CONSTRUCTION CO. 0.94 0.94 100 100
1932 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED RAINA (PART-B) PWSS TO ACCOMODATE FHTC IN RAINA-I BLOCK WITH IN PURBA BARDHAMAN DISTRICT UNDER BURDWAN DIVISION PHE DTE. , SM/19113 Augmentation Restoration of village road damaged by laying pipeline at Nandipara Kalitala,Ranapara and Raina Co-Operative Society of Augmentation of Raina Water Supply Scheme at Raina-I Block within under Burdwan Division,PHE Dte Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000999/2023-2024 117/BSD 18/01/2024 15 SOUMYAVASH DAS 0.92 0.91 98.91 100
1933 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED RAINA (PART-B) PWSS TO ACCOMODATE FHTC IN RAINA-I BLOCK WITH IN PURBA BARDHAMAN DISTRICT UNDER BURDWAN DIVISION PHE DTE. , SM/19113 Augmentation Construction of boundary wall (128.40 Mtr.) including switch room at 3rd tube well site (New) of Aug. of RAINA and its adj. mouzas Piped W/S. Scheme under Budwan Division, PHE. Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000185/2024-2025 2398/BWD 26/06/2024 370 RANADHIR SINHA 19.41 0.00 0 82
1934 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED RAINA (PART-B) PWSS TO ACCOMODATE FHTC IN RAINA-I BLOCK WITH IN PURBA BARDHAMAN DISTRICT UNDER BURDWAN DIVISION PHE DTE. , SM/19113 Augmentation Balance work OHR Connection, Platform, Laying Parallel Pipeline, providing FHTC, Construction of Boundary Wall, Drain & Pathway at Head Work site & Repairing of Pump House at Head Work site & 2nd Tube Well Site for AUGMENTATION OF RAINA PIPED WATER SUPPLY SCHEME, Block- Raina-I, within Burdwan Sub Division under Burdwan Division PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000173/2024-2025 2268/BWD 18/06/2024 378 RANADHIR SINHA 96.75 0.00 0 65
1935 PURBA BARDHAMAN Manteswar Burdwan Division KHANDRA PIPED WATER SUPPLY SCHEME , SM/18505 New Material Requisition To Resource Division RTOR000580/2023-2024 4894/BWD 10/11/2023 0 Resource Division 36.98 0.00 0 0
1936 PURBA BARDHAMAN Manteswar Burdwan Division KHANDRA PIPED WATER SUPPLY SCHEME , SM/18505 New Material Requisition To Resource Division RTOR000530/2023-2024 4292/BWD 29/09/2023 0 Resource Division 68.65 0.00 0 0
1937 PURBA BARDHAMAN Manteswar Burdwan Division KHANDRA PIPED WATER SUPPLY SCHEME , SM/18505 New Material Requisition To Resource Division RTOR000779/2023-2024 322/BWD 24/01/2024 0 Resource Division 42.03 0.00 0 0
1938 PURBA BARDHAMAN Manteswar Burdwan Division KHANDRA PIPED WATER SUPPLY SCHEME , SM/18505 New Material Requisition To Resource Division RTOR000769/2023-2024 205/BWD 10/01/2024 0 Resource Division 19.71 0.00 0 0
1939 PURBA BARDHAMAN Manteswar Central Mechanical KHANDRA PIPED WATER SUPPLY SCHEME , SM/18505 New New Service connection at KHANDRA PWSS TW-1. BILL/02366/2023-2024 BP-2023-24-486 31/01/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.37 0.00 0 0
1940 PURBA BARDHAMAN Manteswar Central Mechanical KHANDRA PIPED WATER SUPPLY SCHEME , SM/18505 New New Service connection at KHANDRA PWSS TW-2. BILL/02367/2023-2024 BP-2023-24-487 31/01/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 4.60 0.00 0 0
1941 PURBA BARDHAMAN Manteswar Central Mechanical KHANDRA PIPED WATER SUPPLY SCHEME , SM/18505 New New service connection for Khandra PH-3 PWSS. BILL/00087/2024-2025 BP-2024-25-26 19/04/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 9.24 0.00 0 0
1942 PURBA BARDHAMAN Manteswar Central Mechanical KHANDRA PIPED WATER SUPPLY SCHEME , SM/18505 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1, 2 & 3 at KHANDRA Water Supply Scheme [ Block-MONTESWAR] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER Junior Engineer ORD/000920/2023-2024 4184/CMD 29/08/2023 30 P.K. ENGINEERING 44.74 0.00 0 33
1943 PURBA BARDHAMAN Manteswar Burdwan Division KHANDRA PIPED WATER SUPPLY SCHEME , SM/18505 New KHANDRA Piped Water Supply Scheme with sinking of Tube-well, LDS, Rising Main, FHTC, Construction of 400 cum capacity RCC OHR with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drain and internal pathway at different TW site under Monteswar Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte J.E. 1 BURDWAN ORD/000691/2023-2024 4387/BWD 05/10/2023 634 AZAD ENTERPRISE 631.12 118.38 18.76 50
1944 PURBA BARDHAMAN Manteswar Central Mechanical KHANDRA PIPED WATER SUPPLY SCHEME , SM/18505 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Sutra & others water supply scheme under Monteswar Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000068/2024-2025 2396/CMD 02/08/2024 455 SINHA ELECTRICALS 78.06 0.00 0 20
1945 PURBA BARDHAMAN Burdwan Division Providing Functional House Hold Tap Connection (FHTC) by retrofitting within the command area of Kshetpur Palashi Piped Water Supply Scheme , SM/07202 Retrofitting Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Khetpur (Pt-B) village of Khetpur Palasi piped water supply scheme within Katwa Sub-Division under Burdwan Division, PHE Dte. [Phase-I](Tr No.-165/BWD/2020-21) Assistant Engineer ORD/000105/2020-2021 2605/BWD 04/08/2020 30 SANTANU BHATTACHARYAY 4.92 9.84 200 1
1946 PURBA BARDHAMAN Burdwan Division Providing Functional House Hold Tap Connection (FHTC) by retrofitting within the command area of Kshetpur Palashi Piped Water Supply Scheme , SM/07202 Retrofitting Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Khetpur (Pt.-A) village of Khetpur Palasi piped water supply scheme within Katwa Sub-Division under Burdwan Division, PHE Dte. [Phase-I](Tr No.-183/BWD/2020-21) Assistant Engineer ORD/000104/2020-2021 2601/BWD 04/08/2020 30 CHANCHAL PAL 4.92 9.84 200 1
1947 PURBA BARDHAMAN Burdwan Division Providing Functional House Hold Tap Connection (FHTC) by retrofitting within the command area of Kshetpur Palashi Piped Water Supply Scheme , SM/07202 Retrofitting Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Khetpur Palashi (Pt-B) village of Khetpur Palashi piped water supply scheme within Katwa Sub-Division under Burdwan Division, PHE Dte. [Phase-I](Tr No.-463/BWD/2020-21) Assistant Engineer ORD/000284/2020-2021 242/KTS 01/10/2020 4 SANTANU BHATTACHARYAY 1.21 2.40 198.35 1
1948 PURBA BARDHAMAN Burdwan Division Providing Functional House Hold Tap Connection (FHTC) by retrofitting within the command area of Kshetpur Palashi Piped Water Supply Scheme , SM/07202 Retrofitting Continuation work order for Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Khetpur (Pt-A) village of Khetpur-Palashi piped water supply scheme within Katwa Sub-Division under Burdwan Division, PHE Dte. [Phase-I](Tr No.-257/BWD/2020-21) Assistant Engineer ORD/000473/2020-2021 3528-A/BWD 25/09/2020 30 CHANCHAL PAL 2.81 5.61 199.64 1
1949 PURBA BARDHAMAN Burdwan Division Providing Functional House Hold Tap Connection (FHTC) by retrofitting within the command area of Kshetpur Palashi Piped Water Supply Scheme , SM/07202 Retrofitting Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Khetpur village of Khetpur Palashi piped water supply scheme within Katwa Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer ORD/000626/2020-2021 366/KTS 15/12/2020 7 TAPAS KUMAR ROY 2.82 5.61 198.94 1
1950 PURBA BARDHAMAN Burdwan Division Providing Functional House Hold Tap Connection (FHTC) by retrofitting within the command area of Kshetpur Palashi Piped Water Supply Scheme , SM/07202 Retrofitting Construction of sluice valve chamber (80 mm dia S/V) of Khetpur Palashi piped water supply scheme under Katwa Sub-Division under Burdwan Division, PHE Dte.[Sl No.-01] Assistant Engineer ORD/000731/2020-2021 14/KTS 08/01/2021 3 CHANCHAL PAL 0.41 0.82 200 1
1951 PURBA BARDHAMAN Burdwan Division Providing Functional House Hold Tap Connection (FHTC) by retrofitting within the command area of Kshetpur Palashi Piped Water Supply Scheme , SM/07202 Retrofitting Providing Functional Household Tap Connection from existing distribution system within the command area of Kshetpur Palashi PWSS under Katwa Sub-Division under Burdwan Division PHE Dte. [Sl No-1] Assistant Engineer ORD/000589/2021-2022 126/KTS 21/02/2022 30 SANTANU BHATTACHARYAY 3.19 3.16 99.06 1
1952 PURBA BARDHAMAN Burdwan Division Providing Functional House Hold Tap Connection (FHTC) by retrofitting within the command area of Kshetpur Palashi Piped Water Supply Scheme , SM/07202 Retrofitting Hire & fuel charges of vehicle (Car No.-WB-41H/3668) for the office of the Assistant Engineer, RWS Burdwan Sub-Division, PHE Dte. for the month of July & August'2022. VCH/000645/2022-2023 612/VEH/22-23 23/09/2022 0 MD HASIN 0.56 0.00 0 0
1953 PURBA BARDHAMAN Burdwan Division Providing Functional House Hold Tap Connection (FHTC) by retrofitting within the command area of Kshetpur Palashi Piped Water Supply Scheme , SM/07202 Retrofitting Continuation work order for supply of 10 mm NB Gun-Metal /Brass Ferrul conforming to IS:2692-1989 for water tap connection in each household from existing distribution system within scheme jurisdiction in different piped water supply scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. and delivered at Barsul Divisional Store.[Part-6] Assistant Engineer ORD/000867/2020-2021 4318/BWD 04/11/2020 10 MD HASIN 4.93 0.42 8.52 1
1954 PURBA BARDHAMAN Burdwan Division Providing Functional House Hold Tap Connection (FHTC) by retrofitting within the command area of Kshetpur Palashi Piped Water Supply Scheme , SM/07202 Retrofitting Hire & fuel charges of vehicle (Car No.-WB-04G-6018) for the office of the Assistant Engineer, Katwa Sub-Division, PHE Dte. for the month of January'23. BILL/00468/2022-2023 1118/JJM 27/02/2023 0 M/S MUNMUN DEY 0.26 0.00 0 0
1955 PURBA BARDHAMAN Burdwan Division Providing Functional House Hold Tap Connection (FHTC) by retrofitting within the command area of Kshetpur Palashi Piped Water Supply Scheme , SM/07202 Retrofitting Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Khetpur Palashi (Part-A) village of Khetpur Palashi piped water supply scheme within Katwa Sub-Division under Burdwan Division, PHE Dte. (Tr No.-471/BWD/2020-21) Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000350/2020-2021 241/KTS 01/10/2020 4 CHANCHAL PAL 1.19 2.33 195.8 1
1956 PURBA BARDHAMAN Burdwan Division Providing Functional House Hold Tap Connection (FHTC) by retrofitting within the command area of Kshetpur Palashi Piped Water Supply Scheme , SM/07202 Retrofitting Detail route survey, design of distribution network and preparation of estimate, drawing & DPR for providing FHTC in the scheme AGRADWIP, KHETPUR PALASHI, SAHAPUR PWSS (Sl No-1) Assistant Engineer JUNIOR ENGINEER KATWA SUB-DIVISION PHE DTE ORD/000069/2023-2024 393/KTS 13/04/2023 30 SIRCON ENGINEERING SERVICES 3.71 1.24 33.42 100
1957 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of SIALI Piped Water Supply Scheme at Jamalpur Block , SM/07856 Retrofitting Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of SIALI Piped Water Supply Scheme at Amarpur (Amarpur Habitation) Village (Mouza), Jamalpur Block under Burdwan Division, PHE Dte. (Agreement No. 572/BWD of 2020-2021) Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000298/2020-2021 439/BWD 19/01/2021 60 M/S ANAND CONSTRUCTION 16.46 0.00 0 1
1958 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of SIALI Piped Water Supply Scheme at Jamalpur Block , SM/07856 Retrofitting Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Reshalatpur village and Reshalatpur habitation of SIALI piped water supply scheme within Burdwan Sub-Division, under Burdwan Division, PHE Dte.[Phase-I] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000694/2020-2021 3321/BWD 18/09/2020 30 MUKHERJEE ENTERPRISE 4.84 0.17 3.51 1
1959 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of SIALI Piped Water Supply Scheme at Jamalpur Block , SM/07856 Retrofitting Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of SIALI Piped Water Supply Scheme at Mudipur (Part), Rasalatpur (Part) Village (Mouza), Jamalpur Block under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000346/2021-2022 58/BWD 05/01/2022 30 BOSE ENTERPRISE 18.34 16.99 92.64 1
1960 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of SIALI Piped Water Supply Scheme at Jamalpur Block , SM/07856 Retrofitting Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of SIALI Piped Water Supply Scheme at Siali (Math Siali & Siali Habitation) Village (Mouza), Jamalpur Block under Burdwan Division, PHE Dte._2ND CALL. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000923/2020-2021 1709/BWD 25/02/2021 30 SKILLS AND FACILITY TRAINING INSTITUTE 18.33 17.48 95.36 1
1961 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of SIALI Piped Water Supply Scheme at Jamalpur Block , SM/07856 Retrofitting Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of SIALI Piped Water Supply Scheme at Ujirpur (Par Ujirpur & Ujirpur Habitation) Village (Mouza), Jamalpur Block under Burdwan Division, PHE Dte._2ND CALL. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000922/2020-2021 1546/BWD 22/02/2021 30 SKILLS AND FACILITY TRAINING INSTITUTE 18.87 18.01 95.44 1
1962 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of SIALI Piped Water Supply Scheme at Jamalpur Block , SM/07856 Retrofitting Continuation work order for water tap connection in each house hold from existing distribution system within scheme jurisdiction in Reshalatpur village and Reslatpur habitation of Siali piped water supply scheme under Burdwan Division, PHE Dte.[Phase-I] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000718/2021-2022 7089/BWD 22/12/2021 30 MUKHERJEE ENTERPRISE 3.45 3.11 90.14 1
1963 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of SIALI Piped Water Supply Scheme at Jamalpur Block , SM/07856 Retrofitting Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of SIALI Piped Water Supply Scheme at Kora (Kora Habitation), Mudipur (Part) (Mudipur (Part) Habitation) & Reshalatpur (Part) (Reshalatpur (Part) Habitation) Village (Mouza), Jamalpur Block under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000642/2020-2021 649/BWD 27/01/2021 60 DHIRENDRANATH SOM 19.53 0.00 0 1
1964 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of SIALI Piped Water Supply Scheme at Jamalpur Block , SM/07856 Retrofitting Re-alignment of damaged distribution pipeline at different section due to road widening (PWD Deptt.) of SIALI piped water supply scheme at Jamalpur Block under Burdwan Division, PHE Dte.[Gr.-G] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000261/2021-2022 667/BSD 08/06/2021 30 RAINBOW CONSTRUCTION 4.70 0.00 0 1
1965 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of SIALI Piped Water Supply Scheme at Jamalpur Block , SM/07856 Retrofitting Extension of uPVC distribution pipe line (Node-128 & 136) in regarding FHTC at Par-Ujirpur village from Sura (Zone-II) water supply scheme within Siali W/S scheme at Jamalpur Development Block. under Burdwan Division, PHE Dte. Gr.B. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000550/2021-2022 370/BSD 02/03/2022 30 BHARAT CONSTRUCTION 3.36 2.78 82.74 1
1966 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of SIALI Piped Water Supply Scheme at Jamalpur Block , SM/07856 Retrofitting Extension of pipeline from existing distribution system within the command area of Siali piped water supply scheme at Siali (Math Siali & Siali Habitation) village mouza under Jamalpur Block under Burdwan Division, PHE Dte. [Gr.-E] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000559/2021-2022 957/BSD 23/07/2021 30 ELECTRONIC SURVILLANCE 3.22 2.81 87.27 1
1967 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of SIALI Piped Water Supply Scheme at Jamalpur Block , SM/07856 Retrofitting Extension of pipeline for providing functional household tap connection at Reshalatpur (Part) of Siali piped water supply scheme within Burdwan Sub-Division under Burdwan Division, PHE Dte.[Gr.-C] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000577/2021-2022 1142/BSD 26/08/2021 30 DHIRENDRANATH SOM 2.49 0.00 0 1
1968 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of SIALI Piped Water Supply Scheme at Jamalpur Block , SM/07856 Retrofitting Extension of pipeline for Providing Functional Household tap connection at Siali Habitation of SIALI Piped Water Supply Scheme under Burdwan Division, P.H.E.Dte. [Group : D] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000037/2022-2023 243/AE/HQ 20/04/2022 30 BOSE ENTERPRISE 3.10 2.92 94.19 1
1969 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of SIALI Piped Water Supply Scheme at Jamalpur Block , SM/07856 Retrofitting Extension of pipeline from existing distribution system within the command area of Siali piped water supply scheme for FHTC at Ujirpur (Par Ujirpur & Ujirpur Habitation) village mouza under Jamalpur Block under Burdwan Division, PHE Dte.[Gr.-F] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000560/2021-2022 958/BSD 23/07/2021 30 ELECTRONIC SURVILLANCE 4.30 3.88 90.23 1
1970 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of SIALI Piped Water Supply Scheme at Jamalpur Block , SM/07856 Retrofitting Extension of pipeline (Branch & Sub Branch) from existing distribution system within the command area of Siali piped water supply scheme for FHTC at Mudipur village and Mudipur habitation within Jamalpur Block under Burdwan Division, PHE Dte.[Gr.-I] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000774/2021-2022 1030/BSD 05/08/2021 30 ELECTRONIC SURVILLANCE 2.16 2.14 99.07 1
1971 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of SIALI Piped Water Supply Scheme at Jamalpur Block , SM/07856 Retrofitting Extension of HDPE pipeline for Providing Functional Household Tap Connection at Amarpur Habitation of SIALI Piped Water Supply Scheme under Burdwan Division,P.H.E.Dte. [Group : E] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000039/2022-2023 244/AE/HQ 20/04/2022 30 BOSE ENTERPRISE 4.11 4.10 99.76 1
1972 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of SIALI Piped Water Supply Scheme at Jamalpur Block , SM/07856 Retrofitting Extension of pipeline for providing functional house hold tap connection at Kora (Part) village of Siali piped water supply scheme within Burdwan Sub-Division under Burdwan Division, PHE Dte. [Gr.-A] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000309/2021-2022 1643/BSD 14/12/2021 30 MUKHERJEE ENTERPRISE 1.73 1.58 91.33 1
1973 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) under the command area of Rahatpur Piped Water Supply Scheme , SM/07555 Retrofitting Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Rahatpur village and Rahatpur Habitation of Rahatpur piped water supply scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. [Phase-I](Tr No.-491/BWD/2020-21) Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000200/2020-2021 4116/BWD 16/10/2020 30 DUBE ENTERPRISE 4.87 9.73 199.79 1
1974 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) under the command area of Rahatpur Piped Water Supply Scheme , SM/07555 Retrofitting Extension of 63 mm dia UPVC pipeline to provide house connection to the beneficiaries of Rahatpur water supply scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. [Sl No.-B] Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000828/2020-2021 139/KSD 12/02/2021 30 DUBE ENTERPRISE 4.49 4.57 101.78 1
1975 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) under the command area of Rahatpur Piped Water Supply Scheme , SM/07555 Retrofitting Continuation work order for water tap connection in each house hold from existing distribution system within scheme jurisdiction in Rahatpur village and Rahatpur habitation of Rahatpur piped water supply scheme within Kalna Sub-Division under Burdwan Division, PHE Dte.[Phase-I][Gr.-7A] Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000837/2020-2021 4913./BWD 08/12/2020 30 DUBE ENTERPRISE 4.31 4.31 100 1
1976 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) under the command area of Bamangaria Piped Water Supply Scheme , SM/07556 Retrofitting Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Banki village and Banki Habitation of Bamangaria piped water supply scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. [Phase-I] Assistant Engineer ORD/000606/2020-2021 4123/BWD 16/10/2020 30 GOUTAM KUMAR MITRA 4.86 9.38 193 1
1977 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) under the command area of Bamangaria Piped Water Supply Scheme , SM/07556 Retrofitting Continuation work order for Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Banki village and Banki habitation of Bamungoria Piped Water Supply Scheme within Kalna Sub-Divn. under Burdwan Division, PHE. Dte. [Phase - I] [GROUP : ¿10B¿] Assistant Engineer ORD/000137/2021-2022 4543/BWD 06/09/2021 30 GOUTAM KUMAR MITRA 0.97 0.97 100 1
1978 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) under the command area of Bamangaria Piped Water Supply Scheme , SM/07556 Retrofitting Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Bamangaria village and Bamangaria habitation of Bamangaria piped water supply scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. [Phase-I](Tr No.-536/BWD/2020-21) Assistant Engineer ORD/000169/2020-2021 4122/BWD 16/10/2020 30 PAL CONSTRUCTION 4.86 9.71 199.79 1
1979 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) under the command area of Bamangaria Piped Water Supply Scheme , SM/07556 Retrofitting Continuation work order for Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Bamangaria village and Bamungoria habitation of Bamungoria Piped Water Supply Scheme within Kalna Sub-Divn. under Burdwan Division, PHE. Dte. [Phase - I] [GROUP : ¿10A¿] Assistant Engineer ORD/000920/2020-2021 151/BWD 08/01/2021 30 PAL CONSTRUCTION 1.73 1.73 100 1
1980 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) under the command area of Bamangaria Piped Water Supply Scheme , SM/07556 Retrofitting Extension of different dia UPVC pipeline to provide house connections to the different leftout areas in the command area of Bamungaria W/S Scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. (Sl No-B) Assistant Engineer ORD/000392/2021-2022 07/KSD Dt-04.01.2022 04/01/2022 31 PAL CONSTRUCTION 2.52 1.61 63.89 1
1981 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) under the command area of Bamangaria Piped Water Supply Scheme , SM/07556 Retrofitting Hire & fuel charges of vehicle (Car No.-WB-04G-7127) for the office of the Assistant Engineer, Kalna Sub-Division, PHE Dte. for the month of March to September'2022. BILL/00145/2022-2023 866/VEH 09/12/2022 0 PARTHA PRATIM ACHARYA 2.79 0.00 0 0
1982 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) under the command area of Bamangaria Piped Water Supply Scheme , SM/07556 Retrofitting Hire & fuel charges of vehicle (Car No.-04G-7127) for the office of the Assistant Engineer, Kalna Sub-Division, PHE Dte. for the month of October & November'2022. BILL/00288/2022-2023 956/JJM/22-23 13/01/2023 0 PARTHA PRATIM ACHARYA 0.77 0.00 0 0
1983 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) under the command area of Bamangaria Piped Water Supply Scheme , SM/07556 Retrofitting Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Bhaturia village (Bhaturia habitation) of Bamungoria Piped Water Supply Scheme within Kalna Sub-Divn. under Burdwan Division, PHE. Dte. (Part-A). [SL. No. : 22] AE(HQs) J.E. 2 BURDWAN ORD/000467/2020-2021 1461/BWD 18/02/2021 15 ABDUL HAI 4.86 9.73 200.21 0
1984 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) under the command area of Bamangaria Piped Water Supply Scheme , SM/07556 Retrofitting Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Bhaturia village (Bhaturia habitation) of Bamungoria Piped Water Supply Scheme within Kalna Sub-Divn. under Burdwan Division, PHE. Dte. (Part-B). [SL. No. : 23] AE(HQs) J.E. 2 BURDWAN ORD/000530/2020-2021 1460/BWD 18/02/2021 15 SANTANU BHATTACHARYAY 4.86 9.73 200.21 0
1985 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) under the command area of Bamangaria Piped Water Supply Scheme , SM/07556 Retrofitting Digital structurization of pipeline alignment and asset evaluation including holistic design, preparation of design drawings of overall LDS & preparation of estimate for 14 Nos. Piped W/S. Schemes under Purbasthali I Block under Kalna Sub-Division under Burdwan Division, PHE. Dte. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000337/2024-2025 3017/BWD 05/08/2024 75 HORIZEN 38.00 13.52 35.58 100
1986 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) under the command area of Bamangaria Piped Water Supply Scheme , SM/07556 Retrofitting Different Types of work involved in connection with Augmentation of SONARUDRA (SM/16349) & KACHUA (SM/13497) Piped Water Supply Scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000192/2024-2025 2430/BWD 27/06/2024 480 R.G. INFRASTRUCTURE 240.70 0.00 0 2
1987 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Mahishgaria Piped Water Supply Scheme at Jamalpur Block , SM/07799 Retrofitting Extension of pipeline including leftout Functional Household Tap Connection (FHTC) for Mahishgoria Piped Water Supply Scheme at Mahishgoria, Bidyabatipur, Narayanpur village in Jamalpur Block under Burdwan Division, PHE Dte. GROUP : D AE(HQs) ORD/000230/2022-2023 427/AE/HQ 03/08/2022 30 A R TRADERS 4.91 4.91 100 1
1988 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Mahishgaria Piped Water Supply Scheme at Jamalpur Block , SM/07799 Retrofitting Providing FHTC for 100% coverage at Baidyabatipur, Tilkuria, Mahishgaria, Narayanpur & Mathurapur village (Mouza) for MAHISHGARIA Piped W/S Scheme, Jamalpur Dev. Block under Burdwan Division, PHE Dte. ORD/000101/2023-2024 2259/BWD 18/05/2023 30 MUKHERJEE ENTERPRISE 11.92 11.75 98.57 100
1989 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Mahishgaria Piped Water Supply Scheme at Jamalpur Block , SM/07799 Retrofitting Land development and Construction of valve chamber by raising of height for control of water flow within command area of MAHISHGORIA H/W Pump house, MAHISHGORIA piped W/S Scheme at Jamalpur Development Block under Burdwan Division, PHE Dte. JE/RWS/JAMALPUR ORD/001034/2024-2025 86/AE/HQ 08/01/2025 30 A.R. TRADERS 0.93 0.00 0 0
1990 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Mahishgaria Piped Water Supply Scheme at Jamalpur Block , SM/07799 Retrofitting Land development and Construction of valve chamber by raising of height at 2nd Pumphouse, MAHISHGORIA piped W/S Scheme at Jamalpur Development Block under Burdwan Division, PHE Dte. JE/RWS/JAMALPUR ORD/001033/2024-2025 85/AE/HQ 08/01/2025 30 A.R. TRADERS 0.72 0.00 0 0
1991 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Jhaudanga Piped Water Supply Scheme at Purbasthali-II Block , SM/07805 Retrofitting Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Jhaudanga & Sarisha village and North Jhaudwnga (Part) & Sarisha habitation of Jhaudanga piped water supply scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. [Phase-I](Tr No.-554/BWD/2020-21) Assistant Engineer ORD/000256/2020-2021 4114/BWD 16/10/2020 30 BARABELUN NO.-II G.P. UNEMPLOYED CO-OP LABOUR CONTRACT & CONSTRUCTION SOCIETY LTD. 4.86 9.72 200 1
1992 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Jhaudanga Piped Water Supply Scheme at Purbasthali-II Block , SM/07805 Retrofitting Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Jhaudanga village and North Jhaudanga (Part) habitation of Jhaudanga piped water supply scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. [Phase-I](Tr No.-761/BWD/2020-21) Assistant Engineer ORD/000372/2020-2021 4113/BWD 16/10/2020 30 BARDHAMAN AQUA ENGINEERING 4.86 9.72 200 1
1993 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Jhaudanga Piped Water Supply Scheme at Purbasthali-II Block , SM/07805 Retrofitting Continuation work order for Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Jhaudanga village and North Jhaudanga (Part) habitation of Jhaudanga piped water supply scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. [Phase-I](Tr No.-762/BWD/2020-21) Assistant Engineer ORD/000373/2020-2021 4795/BWD 03/12/2020 30 BARDHAMAN AQUA ENGINEERING 3.51 7.01 199.72 1
1994 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Jhaudanga Piped Water Supply Scheme at Purbasthali-II Block , SM/07805 Retrofitting Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Jhaudanga village (Jhaudanga south habitation) of Jhaudanga piped water supply scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. [Phase-I](Tr No.-868/BWD/2020-21) Assistant Engineer ORD/000612/2020-2021 597/BWD 25/01/2021 15 INVENT ENGINEERS CO. OPERATIVE SOCIETY LTD. 4.86 9.72 200 1
1995 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Jhaudanga Piped Water Supply Scheme at Purbasthali-II Block , SM/07805 Retrofitting Digital structurization of pipeline alignment and asset evaluation including holistic design, preparation of design drawings of overall LDS & preparation of estimate for 09 Nos. Piped W/S. Schemes under Purbasthali II Block under Kalna Sub-Division under Burdwan Division, PHE. Dte. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000338/2024-2025 3018/BWD 05/08/2024 50 HORIZEN 23.70 7.42 31.31 10
1996 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Jhaudanga Piped Water Supply Scheme at Purbasthali-II Block , SM/07805 Retrofitting Supply & Laying of 300mm Dia M.S.E.R.W Pipe including Jack Pushing along with other allied work in connection with different Augmentation & New [(SM/18439, SM/14437, SM/14435, SM/07805, SM/14440, SM/15571, SM/08030, SM/16014, SM/15588, SM/16298 & SM/16307)] under Kalna Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/001187/2024-2025 608/BWD 11/02/2025 361 MANASH GHOSH 1,209.62 0.00 0 51
1997 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Uttar Radhakantapur Piped Water Supply Scheme at Memari-II Block , SM/07830 Retrofitting Extension of pipeline for UTTAR RADHAKANTAPUR Piped Water Supply Scheme at Radhakantapur High School Kantagorer Par [23 Nos],Total 23 Nos FHTC Work for Sajal Gram (As per Field Verification Report for Har Ghar Jal Certification) within Memari-I Block including leftout household water tap connection(FHTC)under Burdwan Division,PHE Dte. Gr.U Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000337/2022-2023 1365/BSD 04/08/2022 5 D.M. ENTERPRISE 0.97 0.00 0 1
1998 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Uttar Radhakantapur Piped Water Supply Scheme at Memari-II Block , SM/07830 Retrofitting Extension of pipeline for UTTAR RADHAKANTAPUR Piped water Supply Scheme at Harirambati[7 Nos],Kamalpur[4 Nos],Kole[5 Nos],Mallikapur[2 Nos],Sahanagar[5 Nos]Total 23 Nos FHTC Work for Sajal Gram(As per Resulation taken in Special Gram Sava on 01-08-2022 within Memari-I Block including leftout household water tap connection(FHTC)under Burdwan Division,PHE Dte.Gr.D. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000336/2022-2023 1359/BSD 03/08/2022 5 D.M. ENTERPRISE 0.96 0.00 0 1
1999 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Uttar Radhakantapur Piped Water Supply Scheme at Memari-II Block , SM/07830 Retrofitting Extension of pipeline for UTTAR RADHAKANTAPUR Piped Water Supply Scheme at Radhakantapur Purbo Sansad Dule Para(23 Nos)Total 23 Nos FHTC Work for Sajal Gram(As per Field Verification Report for Har Ghar Jal Certification and praved for Prodhan of Gop Ganter-II G.P. within Memari-I Block including leftout household water tap connection(FHTC)under Burdwan Division,PHE Dte. Gr.V Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000338/2022-2023 1366/BSD 04/08/2022 5 D.M. ENTERPRISE 0.97 0.00 0 1
2000 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Uttar Radhakantapur Piped Water Supply Scheme at Memari-II Block , SM/07830 Retrofitting Providing leftout water tap connection in different villages for 100% coverage to make it Sajal Gram from existing distribution system within scheme jurisdiction of different Piped Water Supply Schemes within Memari-I Block (Daluibazar-II, Gopegantar-I & II G.P.) under Burdwan Division, PHE. Dte. Dte._Part-A. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000371/2021-2022 209/BWD 11/01/2022 30 M/S ANAND CONSTRUCTION 21.11 13.18 62.43 1
2001 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Uttar Radhakantapur Piped Water Supply Scheme at Memari-II Block , SM/07830 Retrofitting Extension of pipeline for UTTAR RADHAKANTAPUR Piped Water Supply Scheme at Harirambati [7 No's], Kamalpur [4 No's], Kole [5 No's] Mallikapur [2 No's], Sahanagar [5 No's]Total 23 No's FHTC Work for Sajal Gram (As per Resulation taken in Special Gram Sava on 01-08-2022 within Memari-I Block including leftout household water tap connection (FHTC) under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000647/2022-2023 1359-A/BSD 03/08/2022 5 D.M. ENTERPRISE 0.96 0.96 100 1
2002 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Uttar Radhakantapur Piped Water Supply Scheme at Memari-II Block , SM/07830 Retrofitting Extension of pipeline for UTTAR RADHAKANTAPUR Piped Water Supply Scheme at Radhakantapur High School Kantagorer Par [23 Nos] Total 23 No's FHTC Work for Sajal Gram (As per Field Verification Report for Har Ghar Jal Certification within Memari-I Block including leftout household water tap connection (FHTC) under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000651/2022-2023 1365-A/BSD 04/08/2022 5 D.M. ENTERPRISE 0.97 0.97 100 1
2003 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Uttar Radhakantapur Piped Water Supply Scheme at Memari-II Block , SM/07830 Retrofitting Extension of pipeline for UTTAR RADHAKANTAPUR Piped Water Supply Scheme at Radhakantapur Purbo Sansad Dule Para[23 No's] Total 23 No's FHTC Work for Sajal Gram (As per Field Verification Report for Har Ghar Jal Certification within Memari-I Block including leftout household water tap connection (FHTC) under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000652/2022-2023 1366-A/BSD 04/08/2022 5 D.M. ENTERPRISE 0.97 0.97 100 1
2004 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Uttar Radhakantapur Piped Water Supply Scheme at Memari-II Block , SM/07830 Retrofitting Designing, Making and Erection of Sign Board for SAJAL GRAM in Kamalpur Village, Memari - I Block within Uttar Radhakantapur PWSS under Burdwan Division, PHE Dte. (5 Nos Board) AE(HQs) J.E. 1 BURDWAN ORD/000785/2023-2024 862/AE/HQ 06/11/2023 30 MANABSEBA PROKALPA & CONSTRUCTIONS 0.75 0.72 96 100
2005 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Uttar Radhakantapur Piped Water Supply Scheme at Memari-II Block , SM/07830 Retrofitting Designing, Making and Erection of Sign Board for SAJAL GRAM in Balidanga Village, Memari - I Block within Uttar Radhakantapur PWSS under Burdwan Division, PHE Dte. (5 Nos Board) AE(HQs) J.E. 1 BURDWAN ORD/000786/2023-2024 863/AE/HQ 06/11/2023 30 MANABSEBA PROKALPA & CONSTRUCTIONS 0.75 0.72 96 100
2006 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Uttar Radhakantapur Piped Water Supply Scheme at Memari-II Block , SM/07830 Retrofitting Designing, Making and Erection of Sign Board for SAJAL GRAM in Mallikpur Village, Memari - I Block within Uttar Radhakantapur PWSS under Burdwan Division, PHE Dte. (5 Nos Board) AE(HQs) J.E. 1 BURDWAN ORD/000781/2023-2024 859/AE/HQ 06/11/2023 30 MANABSEBA PROKALPA & CONSTRUCTIONS 0.75 0.72 96 100
2007 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Uttar Radhakantapur Piped Water Supply Scheme at Memari-II Block , SM/07830 Retrofitting Designing, Making and Erection of Sign Board for SAJAL GRAM in Sahanagar Village, Memari - I Block within Uttar Radhakantapur PWSS under Burdwan Division, PHE Dte. (5 Nos Board) AE(HQs) J.E. 1 BURDWAN ORD/000782/2023-2024 860/AE/HQ 06/11/2023 30 MANABSEBA PROKALPA & CONSTRUCTIONS 0.75 0.72 96 100
2008 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Uttar Radhakantapur Piped Water Supply Scheme at Memari-II Block , SM/07830 Retrofitting Designing, Making and Erection of Sign Board for SAJAL GRAM in Purba Shrirampur Village, Memari - II Block within Uttar Radhakantapur PWSS under Burdwan Division, PHE Dte. (5 Nos Board) AE(HQs) J.E. 1 BURDWAN ORD/000742/2023-2024 837/AE/HQ 31/10/2023 30 MUNSHI JAVEDUR JAMAN 0.76 0.72 94.74 100
2009 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Uttar Radhakantapur Piped Water Supply Scheme at Memari-II Block , SM/07830 Retrofitting Extension of PVC Water supply line at Koley village for UTTAR RADHAKANTAPUR and its adjoining mouza W/S Scheme Block:Memari-I within Burdwan Sub-Division,PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER RWS BURDWAN SUB-DIVISION PHE DTE,Junior Engineer, RWS, Memari-I Dev. Bolck ORD/001012/2023-2024 120/BSD 18/01/2024 30 A R TRADERS 0.92 0.80 86.96 98
2010 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Uttar Radhakantapur Piped Water Supply Scheme at Memari-II Block , SM/07830 Retrofitting Restoration of concrete road by Cement concrete (mix 1:1.5:3), Providing balance FHTC, parallel pipeline, drainage system, boundary wall, Bridge, land development, Sluice valve chamber for smooth water supply of FHTC work for UTTAR RADHAKANTAPUR PWSS and its adjoining mouzas within MEMARI-I BLOCK under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. Junior Engineer, RWS, Memari-I Dev. Bolck ORD/001164/2024-2025 556/BWD 05/02/2025 90 SANDIP SARKAR 14.45 0.00 0 100
2011 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Masagram Piped Water Supply Scheme at Jamalpur Block , SM/07815 Retrofitting Extension of UPVC distribution pipeline in connection with FHTC for Masagram (Zone-I) & adjoining mouzas water supply scheme at Jamalpur Development Block under Burdwan Division, PHE Dte.[Gr.-B] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000419/2021-2022 1112/BSD 23/08/2021 45 M/S ASHA CONSTRUCTION 4.71 4.71 100 1
2012 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Masagram Piped Water Supply Scheme at Jamalpur Block , SM/07815 Retrofitting Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of Masagram Piped Water Supply Scheme at Habaspur Village, Chouberia Village, Ballabhbati Village & Masagram (4 Nos. habitations), Jamalpur Block under Burdwan Division, PHE Dte. (Agr. No. 710/BWD of 2020-2021) Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000342/2020-2021 1578/BWD 22/02/2021 60 MD HASIN 60.21 65.84 109.35 1
2013 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Masagram Piped Water Supply Scheme at Jamalpur Block , SM/07815 Retrofitting Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of Masagram Piped Water Supply Scheme at Dadpur Village, Sarangpur Village (2Nos. habitations) & Sanchra Village, Jamalpur Block under Burdwan Division, PHE Dte.(Agreement No. 753/BWD of 2020-2021) Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000437/2020-2021 1599/BWD 22/02/2021 60 M/S ASHA CONSTRUCTION 65.00 98.84 152.06 1
2014 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Masagram Piped Water Supply Scheme at Jamalpur Block , SM/07815 Retrofitting Construction of Boundary Wall at 2nd T/W Site of Masagram Zone-I Water Supply Scheme under Jamalpur Block of Burdwan Division, PHE Dte (Length-50.0 Mtr,Col-17 Nos). Gr.E. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000443/2021-2022 201/BSD 01/02/2022 45 SANDIPAN SENGUPTA 3.12 0.00 0 1
2015 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Masagram Piped Water Supply Scheme at Jamalpur Block , SM/07815 Retrofitting Extension of UPVC distribution pipeline in connection with FHTC for Masagram (Zone-II) and its adjoining mouzas water supply scheme at Jamalpur Development Block under Burdwan Division, PHE Dte. (Habaspur Habitation) [Gr.-A] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000535/2021-2022 1206/BSD 09/09/2021 30 MD HASIN 4.85 4.84 99.79 1
2016 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Masagram Piped Water Supply Scheme at Jamalpur Block , SM/07815 Retrofitting Laying of 200mm.dia. HDPE Distribution pipe line (Node No.118 to 119) for Masagram (Zone-I) & adjoining mouzas Water Supply Scheme at Jamalpur Development block under Burdwan Division,PHE Dte. Group : C. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000090/2022-2023 830/BSD 23/05/2022 30 M/S ASHA CONSTRUCTION 4.60 0.00 0 1
2017 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Masagram Piped Water Supply Scheme at Jamalpur Block , SM/07815 Retrofitting Extension of pipe linefor providing functional house hold tap connection at Sanchra habitation(Part)of MOSAGRAM ZONE-II Piped Water Supply Schemewithin Burdwan Sub-Divn under Burdwan Division,PHE Dte". Group : E. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000104/2022-2023 987/BSD 16/06/2022 30 MD HASIN 2.51 2.51 100 1
2018 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Masagram Piped Water Supply Scheme at Jamalpur Block , SM/07815 Retrofitting Construction of Approach P.C.C Road & Circular Soak Well At Head works site of MASAGRAM Zone-II Piped W/S. Scheme at Jamalpur Dev. Block under Burdwan Division, PHE Dte._2ND CALL Junior Engineer, Burdwan Division ORD/000837/2024-2025 966/AE/HQ 22/11/2024 30 SOUMYAVASH DAS 0.93 0.00 0 0
2019 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Masagram Piped Water Supply Scheme at Jamalpur Block , SM/07815 Retrofitting Re-laying of u-PVC Pipeline damaged by Irrigation department at Sanchra village of Masagram Zone-II Piped W/S Scheme at Jamalpur Development Block under Burdwan Division,PHE Dte ORD/001130/2023-2024 127/BSD 18/01/2024 30 DHIRENDRANATH SOM 0.85 0.00 0 0
2020 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Masagram Piped Water Supply Scheme at Jamalpur Block , SM/07815 Retrofitting Re-laying of UPVC Pipeline(Damaged by Irrigation Department)and repairing damaged FHTC at Masagram Mouza (Habitation) under Masagram Zone-I Piped Water Supply Scheme Jamalpur Development under Burdwan Division,PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. RWS_JAMALPUR ORD/000183/2023-2024 1007/BSD 06/06/2023 15 DEBASHISH ENTERPRISE 0.85 0.83 97.65 100
2021 PURBA BARDHAMAN Burdwan Division DETAILED PROJECT REPORT FOR AUGMENTATION SAMUDRAGARH PWSS FOR PROVIDING FUNCTIONAL HOUSEHOLD TAP CONNECTION (FHTC) BLOCK PURBASTHALI-I PURBA BARDHAMAN WEST BENGAL , SM/09409 Augmentation Preparation of DPR for augmentation of Samudragarh W/S Scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. (Sl No-E) Assistant Engineer ORD/000583/2021-2022 217/KSD 24/02/2022 21 M/S R. DUTTA & CO. 2.80 2.78 99.29 1
2022 PURBA BARDHAMAN Burdwan Division DETAILED PROJECT REPORT FOR AUGMENTATION SAMUDRAGARH PWSS FOR PROVIDING FUNCTIONAL HOUSEHOLD TAP CONNECTION (FHTC) BLOCK PURBASTHALI-I PURBA BARDHAMAN WEST BENGAL , SM/09409 Augmentation Supply and delivery of different dia. CIDF sluice valve for Augmentation of SAMUDRAGARH Piped Water Supply Scheme under Burdwan Division, P.H.E. Dte.SL. No. 10 Assistant Engineer ORD/000636/2021-2022 144/AE/HQ 16/03/2022 10 MA SARADA ENTERPRISE 4.52 4.52 100 1
2023 PURBA BARDHAMAN Burdwan Division DETAILED PROJECT REPORT FOR AUGMENTATION SAMUDRAGARH PWSS FOR PROVIDING FUNCTIONAL HOUSEHOLD TAP CONNECTION (FHTC) BLOCK PURBASTHALI-I PURBA BARDHAMAN WEST BENGAL , SM/09409 Augmentation Supply of materials for different water supply scheme under Burdwan Division, PHE Dte. VCH/001578/2021-2022 1207/DW 10/03/2022 0 EXECUTIVE ENGINEER, RESOURCES DIVISION, P.H.E. DTE. 3,005.00 0.00 0 0
2024 PURBA BARDHAMAN Burdwan Division DETAILED PROJECT REPORT FOR AUGMENTATION SAMUDRAGARH PWSS FOR PROVIDING FUNCTIONAL HOUSEHOLD TAP CONNECTION (FHTC) BLOCK PURBASTHALI-I PURBA BARDHAMAN WEST BENGAL , SM/09409 Augmentation Additional works to implement the augmentation of SAMUDRAGARH Piped Water Supply Scheme under Purbasthali-I Block, Dist :- Purba Burdwan under Burdwan Division, PHE. Dte. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000016/2023-2024 1731/BWD 13/04/2023 30 AZAD CONSTRUCTION 18.67 15.24 81.63 100
2025 PURBA BARDHAMAN Burdwan Division DETAILED PROJECT REPORT FOR AUGMENTATION SAMUDRAGARH PWSS FOR PROVIDING FUNCTIONAL HOUSEHOLD TAP CONNECTION (FHTC) BLOCK PURBASTHALI-I PURBA BARDHAMAN WEST BENGAL , SM/09409 Augmentation Material Requisition To Resource Division RTOR000109/2021-2022 930/BWD 16/02/2022 0 Resource Division 22.00 0.00 0 0
2026 PURBA BARDHAMAN Burdwan Division DETAILED PROJECT REPORT FOR AUGMENTATION SAMUDRAGARH PWSS FOR PROVIDING FUNCTIONAL HOUSEHOLD TAP CONNECTION (FHTC) BLOCK PURBASTHALI-I PURBA BARDHAMAN WEST BENGAL , SM/09409 Augmentation Material Requisition To Resource Division RTOR000208/2021-2022 1531/BWD 15/03/2022 0 Resource Division 0.37 0.00 0 0
2027 PURBA BARDHAMAN Burdwan Division DETAILED PROJECT REPORT FOR AUGMENTATION SAMUDRAGARH PWSS FOR PROVIDING FUNCTIONAL HOUSEHOLD TAP CONNECTION (FHTC) BLOCK PURBASTHALI-I PURBA BARDHAMAN WEST BENGAL , SM/09409 Augmentation Material Requisition To Resource Division RTOR000041/2021-2022 540/BWD 27/01/2022 0 Resource Division 20.81 0.00 0 0
2028 PURBA BARDHAMAN Burdwan Division DETAILED PROJECT REPORT FOR AUGMENTATION SAMUDRAGARH PWSS FOR PROVIDING FUNCTIONAL HOUSEHOLD TAP CONNECTION (FHTC) BLOCK PURBASTHALI-I PURBA BARDHAMAN WEST BENGAL , SM/09409 Augmentation Quotation charges of WBSEDCL of Aug. of Samudragarh PWSS. [Ref. ID-503495985] BILL/01124/2023-2024 1087/JJM 20/12/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LTD. 4.42 0.00 0 0
2029 PURBA BARDHAMAN Burdwan Division DETAILED PROJECT REPORT FOR AUGMENTATION SAMUDRAGARH PWSS FOR PROVIDING FUNCTIONAL HOUSEHOLD TAP CONNECTION (FHTC) BLOCK PURBASTHALI-I PURBA BARDHAMAN WEST BENGAL , SM/09409 Augmentation Augmentation of SAMUDRAGARH Piped Water Supply Scheme with LDS, FHTC, Rising Main, Construction of 450 Cum capacity OHR with 20.0 Mtr. Staging height inclusive of soil investigation including with construction of boundary wall at Head works site under Purbasthali I Block, District - Purba Bardhaman. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000015/2022-2023 1963/BWD 12/04/2022 365 AZAD ENTERPRISE 426.18 262.64 61.63 80
2030 PURBA BARDHAMAN Burdwan Division DETAILED PROJECT REPORT FOR AUGMENTATION SAMUDRAGARH PWSS FOR PROVIDING FUNCTIONAL HOUSEHOLD TAP CONNECTION (FHTC) BLOCK PURBASTHALI-I PURBA BARDHAMAN WEST BENGAL , SM/09409 Augmentation Additional work for Sinking of Tube Well, Construction of Pump House, boundary wall, Providing FHTC & additional pipeline of SAMUDRAGARH Water Supply Scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000540/2023-2024 3660/BWD 22/08/2023 120 JAHAR GHOSH 78.52 69.60 88.64 90
2031 PURBA BARDHAMAN Burdwan Division DETAILED PROJECT REPORT FOR AUGMENTATION SAMUDRAGARH PWSS FOR PROVIDING FUNCTIONAL HOUSEHOLD TAP CONNECTION (FHTC) BLOCK PURBASTHALI-I PURBA BARDHAMAN WEST BENGAL , SM/09409 Augmentation Quotation charges of WBSEDCL of Aug. of Samudragarh PWSS. [Ref. ID-503564676][TW-4] BILL/01690/2023-2024 1366/JJM 20/02/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LTD. 7.35 0.00 0 0
2032 PURBA BARDHAMAN Burdwan Division DETAILED PROJECT REPORT FOR AUGMENTATION SAMUDRAGARH PWSS FOR PROVIDING FUNCTIONAL HOUSEHOLD TAP CONNECTION (FHTC) BLOCK PURBASTHALI-I PURBA BARDHAMAN WEST BENGAL , SM/09409 Augmentation Quotation from WBSEDCL for load enhancement of Augmentation of Samudragarh w/s scheme for P.H.-3 under Burdwan Division, PHE Dte. BILL/01928/2023-2024 1825/JJM 27/03/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LTD. 0.39 0.00 0 0
2033 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap connection (FHTC) by retrofitting within the command area of PALSIT Piped Water Supply Scheme at BURDWAN-II Block under Burdwan Division, P.H.E. DTE. , SM/08714 Retrofitting Additional extension UPVC distribution Pipeline in connection with FHTC work for Palsit Piped Water Supply Scheme at Khargram, Karanda, Palsit & Bhaita under Bardhaman- II Block under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000172/2021-2022 6065/BWD 07/10/2021 30 BRINDABAN KONAR 14.22 13.89 97.68 1
2034 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap connection (FHTC) by retrofitting within the command area of PALSIT Piped Water Supply Scheme at BURDWAN-II Block under Burdwan Division, P.H.E. DTE. , SM/08714 Retrofitting Hire & fuel charges of vehicle (Car No.-WB-41H/3668) for the office of the Assistant Engineer, RWS Burdwan Sub-Division, PHE Dte. for the month of July & August'2022. VCH/000645/2022-2023 612/VEH/22-23 23/09/2022 0 MD HASIN 0.56 0.00 0 0
2035 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap connection (FHTC) by retrofitting within the command area of PALSIT Piped Water Supply Scheme at BURDWAN-II Block under Burdwan Division, P.H.E. DTE. , SM/08714 Retrofitting Construction of boundary wall including land development at 2nd Pump house of PALSIT within command area of PALSIT Piped W/S. Scheme under Burdwan Division, PHE. Dte. [Group : F] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000057/2022-2023 238/AE/HQ 19/04/2022 30 M/S F.S. ENTERPRISE 0.96 0.00 0 1
2036 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap connection (FHTC) by retrofitting within the command area of PALSIT Piped Water Supply Scheme at BURDWAN-II Block under Burdwan Division, P.H.E. DTE. , SM/08714 Retrofitting Sinking of 300 X 200mm dia Tube Well 150 mtr. Depth by D.R. Rig method using UPVC pipe (CM) and UPVC Deep Well Screen (RMS) for Augmentation of PALSIT & its adjoining mouzas Piped Water Supply Scheme, Block - Burdwan - II, Dist - Purba Bardhaman under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000523/2022-2023 4886/BWD 02/11/2022 30 WESTERN WATER SUPPLY AGENCY 10.04 10.04 100 100
2037 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap connection (FHTC) by retrofitting within the command area of PALSIT Piped Water Supply Scheme at BURDWAN-II Block under Burdwan Division, P.H.E. DTE. , SM/08714 Retrofitting Providing FHTC for 100% coverage in different village from existing distribution system within PALSIT PWSS, Bardhhaman-II Development Block under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000790/2022-2023 1423/BWD 24/03/2023 30 BABUL SK 28.53 27.27 95.58 100
2038 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap connection (FHTC) by retrofitting within the command area of PALSIT Piped Water Supply Scheme at BURDWAN-II Block under Burdwan Division, P.H.E. DTE. , SM/08714 Retrofitting Providing functional household tap connection (FHTC) from existing distribution system within the command area of Palsit piped water supply scheme at Bhaita (11 Nos Habitation), Khargram (17 Nos. Habitation), Palsit (19 Nos. Habitation), Karanda (17 Nos. Habitation) & Paschim Chandipur village, Bardhaman-II Block under Burdwan Division, PHE Dte. AE(HQs) J.E. 2 BURDWAN ORD/000528/2020-2021 5000/BWD 10/12/2020 90 BRINDABAN KONAR 96.95 55.82 57.58 0
2039 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap connection (FHTC) by retrofitting within the command area of PALSIT Piped Water Supply Scheme at BURDWAN-II Block under Burdwan Division, P.H.E. DTE. , SM/08714 Retrofitting Construction of Pump House cum chlorine room without sanitary and water supply arrangement at Tube Well Site to departmental drawing no-PHE/BD/P.H/DRG/02/DEC-17(Size 3.60 mtr x 3.00 mtr room) for PALSIT its Adjoining Mouza W/S Scheme, Block -Bardhaman-II within Burdwan Sub-Division, PHE Dte. (Mouza- KARANA) Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000766/2022-2023 498/BSD 21/03/2023 45 M/S PALASH BISWAS 3.32 3.17 95.48 100
2040 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap connection (FHTC) by retrofitting within the command area of PALSIT Piped Water Supply Scheme at BURDWAN-II Block under Burdwan Division, P.H.E. DTE. , SM/08714 Retrofitting Providing parallel distribution system from Khargram more to Bhaita High School within PALSIT PWSS, Bardhhaman-II Development Block under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. Junior Engineer, Burdwan Sadar Sub-Division ORD/000968/2023-2024 005/BWD 02/01/2024 30 TARAMA AGENCY 20.68 18.80 90.91 100
2041 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap connection (FHTC) by retrofitting within the command area of PALSIT Piped Water Supply Scheme at BURDWAN-II Block under Burdwan Division, P.H.E. DTE. , SM/08714 Retrofitting Providing left out FHTC for 100% coverage in different village within PALSIT PWSS, Bardhhaman-II Development Block under Burdwan Division, PHE Dte Junior Engineer, Burdwan Sadar Sub-Division ORD/000153/2024-2025 1038/BSD 10/06/2024 30 M/S PALASH BISWAS 0.95 0.94 98.95 100
2042 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap connection (FHTC) by retrofitting within the command area of PALSIT Piped Water Supply Scheme at BURDWAN-II Block under Burdwan Division, P.H.E. DTE. , SM/08714 Retrofitting Providing left out FHTC for 100% covarage in different village within PALSIT PWSS , Bardhhaman-II Development Block under Burdwan Division, PHE Dte. Junior Engineer, Burdwan Sadar Sub-Division ORD/000116/2024-2025 995/BSD 06/06/2024 30 M/S PALASH BISWAS 0.96 0.95 98.96 100
2043 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap connection (FHTC) by retrofitting within the command area of PALSIT Piped Water Supply Scheme at BURDWAN-II Block under Burdwan Division, P.H.E. DTE. , SM/08714 Retrofitting Laying of inter connection R.main to OHR,OHR to LDS & By pass connection for PALSIT PWSS under Burdwan Sub-Division under Burdwan Division,PHE Dte. Junior Engineer, Burdwan Sadar Sub-Division ORD/001280/2024-2025 503/BSD 06/03/2025 36 HAMID SK 0.94 0.00 0 100
2044 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap connection (FHTC) by retrofitting within the command area of PALSIT Piped Water Supply Scheme at BURDWAN-II Block under Burdwan Division, P.H.E. DTE. , SM/08714 Retrofitting Designing,making and erection of Sign Board for SWAJAL GRAM in Paschim Chandipur village of Burdwan-II Block under Palsit Piped Water Supply Scheme within Burdwan Sub-Division under Burdwan Division,PHE Dte(5 nos. Board) Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. Junior Engineer, Burdwan Sadar Sub-Division ORD/000470/2025-2026 2336/BSD 21/08/2025 10 MANABSEBA PROKALPA & CONSTRUCTIONS 0.72 0.00 0 100
2045 PURBA BARDHAMAN Burdwan Division AGUMENTATION OF GROUND WATER BASED SRIDHARPUR PWSS TO ACCOMMODATE FHTC IN MEMARI-II BLOCK UNDER BURDWAN SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/09488 Augmentation Route Survey & Preparation of DPR for Sridharpur W/S Scheme under Memari-II Block under Burdwan Sub-Division under Burdwan Division PHE Dte. Sl No.6. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000494/2021-2022 181/BSD 31/01/2022 30 RADIANT 2.59 2.59 100 1
2046 PURBA BARDHAMAN Burdwan Division AGUMENTATION OF GROUND WATER BASED SRIDHARPUR PWSS TO ACCOMMODATE FHTC IN MEMARI-II BLOCK UNDER BURDWAN SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/09488 Augmentation Supply of materials for different water supply scheme under Burdwan Division, PHE Dte. VCH/001578/2021-2022 1207/DW 10/03/2022 0 EXECUTIVE ENGINEER, RESOURCES DIVISION, P.H.E. DTE. 3,005.00 0.00 0 0
2047 PURBA BARDHAMAN Burdwan Division AGUMENTATION OF GROUND WATER BASED SRIDHARPUR PWSS TO ACCOMMODATE FHTC IN MEMARI-II BLOCK UNDER BURDWAN SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/09488 Augmentation Augmentation of SRIDHARPUR Piped Water Supply Scheme with LDS, FHTC, Rising Main with necessary interconnection, Construction of 200 Cum capacity OHR with 20.0 Mtr. Staging height inclusive of soil investigation under Memari II Block, District Purba Bardhaman. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000007/2022-2023 1937/BWD 11/04/2022 365 SUJAY KUMAR RAY 251.30 178.78 71.14 60
2048 PURBA BARDHAMAN Burdwan Division AGUMENTATION OF GROUND WATER BASED SRIDHARPUR PWSS TO ACCOMMODATE FHTC IN MEMARI-II BLOCK UNDER BURDWAN SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/09488 Augmentation Material Requisition To Resource Division RTOR000062/2021-2022 562/BWD 27/01/2022 0 Resource Division 11.00 0.00 0 0
2049 PURBA BARDHAMAN Burdwan Division AGUMENTATION OF GROUND WATER BASED SRIDHARPUR PWSS TO ACCOMMODATE FHTC IN MEMARI-II BLOCK UNDER BURDWAN SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/09488 Augmentation Material Requisition To Resource Division RTOR000110/2021-2022 1069/BWD 24/02/2022 0 Resource Division 37.52 0.00 0 0
2050 PURBA BARDHAMAN Burdwan Division AGUMENTATION OF GROUND WATER BASED SRIDHARPUR PWSS TO ACCOMMODATE FHTC IN MEMARI-II BLOCK UNDER BURDWAN SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/09488 Augmentation Material Requisition To Resource Division RTOR000197/2021-2022 1520/BWD 15/03/2022 0 Resource Division 0.37 0.00 0 0
2051 PURBA BARDHAMAN Burdwan Division AGUMENTATION OF GROUND WATER BASED SRIDHARPUR PWSS TO ACCOMMODATE FHTC IN MEMARI-II BLOCK UNDER BURDWAN SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/09488 Augmentation Repairing of RCC Elevated Reservoir (Capacity 140 Cum) of SRIDHARPUR Piped Water Supply Scheme under Burdwan Sub-Division within Burdwan Division P.H.E. Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000608/2023-2024 3812/BWD 01/09/2023 30 SUJAY KUMAR RAY 7.41 0.00 0 100
2052 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED SAGRIA PWSS TO ACCOMMODATE FHTC IN KHANDOGHOSH BLOCK UNDER BURDWAN SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/09492 Augmentation Route Survey & Preparation of DPR for Sagrai W/S Scheme under Khandaghosh Block under Burdwan Sub-Division under Burdwan Division PHE Dte. Sl No.11. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000500/2021-2022 186/BSD 31/01/2022 30 RADIANT 2.92 2.91 99.66 1
2053 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED SAGRIA PWSS TO ACCOMMODATE FHTC IN KHANDOGHOSH BLOCK UNDER BURDWAN SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/09492 Augmentation Supply of materials for different water supply scheme under Burdwan Division, PHE Dte. VCH/001578/2021-2022 1207/DW 10/03/2022 0 EXECUTIVE ENGINEER, RESOURCES DIVISION, P.H.E. DTE. 3,005.00 0.00 0 0
2054 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED SAGRIA PWSS TO ACCOMMODATE FHTC IN KHANDOGHOSH BLOCK UNDER BURDWAN SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/09492 Augmentation Repairing of dismantling concrete road by Cement Concrete (1:3:6) for Augmentation of KHANDAGHOSH Pipe Water Supply Scheme (Mouza Khandaghosh, Iodna, Barisiali, Kapshit, Nabagram, Metedanga) at Khandaghosh Block of Burdwan Sub-Division under Burdwan Division, PHE Dte. Gr.A. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000364/2022-2023 1403/BSD 10/08/2022 60 JMD ENGINEERING INFRASTRUCTURE COMPANY 4.81 0.00 0 100
2055 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED SAGRIA PWSS TO ACCOMMODATE FHTC IN KHANDOGHOSH BLOCK UNDER BURDWAN SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/09492 Augmentation Sinking of 300 X 200mm dia Tube Well 150 mtr. Depth by D.R. Rig method using UPVC pipe (CM) and UPVC Deep Well Screen (RMS) for Augmentation of SAGRAI & its adjoining mouzas Piped Water Supply Scheme, Block - Khandaghosh, Dist - Purba Bardhaman under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000516/2022-2023 4613/BWD 17/10/2022 30 M/S SYCHROTECH INDUSTRY 10.22 8.15 79.75 0
2056 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED SAGRIA PWSS TO ACCOMMODATE FHTC IN KHANDOGHOSH BLOCK UNDER BURDWAN SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/09492 Augmentation Augmentation of SAGRAI Piped Water Supply Scheme with LDS, FHTC, Rising Main with necessary interconnections & Construction of 400 Cum capacity OHR with 20.0 Mtr. Staging height inclusive of soil test under Khandaghosh Block, District - Purba Bardhaman. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000642/2021-2022 1624/BWD 21/03/2022 12 NATIONAL CONSTRUCTION 472.26 472.14 99.97 1
2057 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED SAGRIA PWSS TO ACCOMMODATE FHTC IN KHANDOGHOSH BLOCK UNDER BURDWAN SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/09492 Augmentation Material Requisition To Resource Division RTOR000058/2021-2022 561/BWD 27/01/2022 0 Resource Division 16.61 0.00 0 0
2058 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED SAGRIA PWSS TO ACCOMMODATE FHTC IN KHANDOGHOSH BLOCK UNDER BURDWAN SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/09492 Augmentation Material Requisition To Resource Division RTOR000218/2021-2022 1541/BWD 15/03/2022 0 Resource Division 0.37 0.00 0 0
2059 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED SAGRIA PWSS TO ACCOMMODATE FHTC IN KHANDOGHOSH BLOCK UNDER BURDWAN SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/09492 Augmentation Material Requisition To Resource Division RTOR000092/2021-2022 931/BWD 16/02/2022 0 Resource Division 25.87 0.00 0 0
2060 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED SASINARA ZONE III PWSS TO ACCOMMODATE FHTC IN MEMARI-I BLOCK UNDER BURDWAN SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/10059 Augmentation Laying distribution and rising main pipeline including Providing Functional Household Tap Connection (FHTC) for augmentation of SASINARA ZONE III Piped Water Supply Scheme under MEMARI I Block, District: Purba Bardhaman under Burdwan Division, PHE. Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000001/2022-2023 1839/BWD 04/04/2022 30 THREE MAA ENTERPRISE 49.71 49.60 99.78 1
2061 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED SASINARA ZONE III PWSS TO ACCOMMODATE FHTC IN MEMARI-I BLOCK UNDER BURDWAN SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/10059 Augmentation Laying of 90mm dia pipeline for SASINARA ZONE-III Piped Water Supply Scheme from Pump house to Nishraghar dharmatala via Annapurnatala under MEMARI- I Block under Burdwan Sub-Division under Burdwan Division, PHE Dte. Group.A. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000099/2022-2023 965/BSD 14/06/2022 30 THREE MAA ENTERPRISE 4.78 4.78 100 1
2062 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED SASINARA ZONE III PWSS TO ACCOMMODATE FHTC IN MEMARI-I BLOCK UNDER BURDWAN SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/10059 Augmentation Providing Balance Functional Household Tap Connection (FHTC) from existing distribution system within the command area of SASINARA ZONE-III Piped Water Supply Scheme and under NISHRAGHAR Mouza under MEMARI-I Block of Burdwan Sub-Division under Burdwan Division, PHE. Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000764/2022-2023 510/BSD 21/03/2023 45 A R TRADERS 3.51 3.49 99.43 100
2063 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED SASINARA ZONE III PWSS TO ACCOMMODATE FHTC IN MEMARI-I BLOCK UNDER BURDWAN SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/10059 Augmentation Route Survey & Preparation of DPR for Sasinara (Zone-II) & (Zone-III) W/S Scheme under Burdwan-II Block under Burdwan Sub-Division under Burdwan Division PHE Dte. Sl No.2. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000491/2021-2022 177/BSD 31/01/2022 30 RADIANT 3.76 1.88 50 1
2064 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED SASINARA ZONE III PWSS TO ACCOMMODATE FHTC IN MEMARI-I BLOCK UNDER BURDWAN SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/10059 Augmentation Material Requisition To Resource Division RTOR000151/2021-2022 1245/BWD 07/03/2022 0 Resource Division 3.92 0.00 0 0
2065 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED SASINARA ZONE III PWSS TO ACCOMMODATE FHTC IN MEMARI-I BLOCK UNDER BURDWAN SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/10059 Augmentation Material Requisition To Resource Division RTOR000180/2021-2022 1337/BWD 08/03/2022 0 Resource Division 2.81 0.00 0 0
2066 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED SASINARA ZONE III PWSS TO ACCOMMODATE FHTC IN MEMARI-I BLOCK UNDER BURDWAN SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/10059 Augmentation Material Requisition To Resource Division RTOR000225/2021-2022 1548/BWD 15/03/2022 0 Resource Division 1.32 0.00 0 0
2067 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED SASINARA ZONE I PWSS TO ACCOMMODATE FHTC IN MEMARI-I BLOCK UNDER BURDWAN SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/10057 Augmentation Route Survey & Preparation of DPR for Sasinara (Zone-I) W/S Scheme under Memari-I Block under Burdwan Sub-Division under Burdwan Division PHE Dte. Sl No.3 Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000511/2021-2022 178/BSD 31/01/2022 30 APEX ENGINEERING 3.01 3.00 99.67 1
2068 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED SASINARA ZONE I PWSS TO ACCOMMODATE FHTC IN MEMARI-I BLOCK UNDER BURDWAN SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/10057 Augmentation Supply of materials for different water supply scheme under Burdwan Division, PHE Dte. VCH/001578/2021-2022 1207/DW 10/03/2022 0 EXECUTIVE ENGINEER, RESOURCES DIVISION, P.H.E. DTE. 3,005.00 0.00 0 0
2069 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED SASINARA ZONE I PWSS TO ACCOMMODATE FHTC IN MEMARI-I BLOCK UNDER BURDWAN SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/10057 Augmentation Material Requisition To Resource Division RTOR000154/2021-2022 1246/BWD 07/03/2022 0 Resource Division 4.36 0.00 0 0
2070 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED SASINARA ZONE I PWSS TO ACCOMMODATE FHTC IN MEMARI-I BLOCK UNDER BURDWAN SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/10057 Augmentation Material Requisition To Resource Division RTOR000226/2021-2022 1554/BWD 15/03/2022 0 Resource Division 0.37 0.00 0 0
2071 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED SASINARA ZONE I PWSS TO ACCOMMODATE FHTC IN MEMARI-I BLOCK UNDER BURDWAN SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/10057 Augmentation Material Requisition To Resource Division RTOR000174/2021-2022 1333/BWD 08/03/2022 0 Resource Division 51.36 0.00 0 0
2072 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED SASINARA ZONE I PWSS TO ACCOMMODATE FHTC IN MEMARI-I BLOCK UNDER BURDWAN SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/10057 Augmentation Material Requisition To Resource Division RTOR000043/2022-2023 4853/BWD 20/10/2022 0 Resource Division 13.55 0.00 0 0
2073 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED SASINARA ZONE I PWSS TO ACCOMMODATE FHTC IN MEMARI-I BLOCK UNDER BURDWAN SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/10057 Augmentation Restoration of Pump House at Head Work site of SASINARA ZONE-I Piped water supply scheme at Memari-I Block under Burdwan Division, Dist.-Purba Bardhaman. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000182/2024-2025 1004/BSD 06/06/2024 30 MS MOLLA CONSTRUCTION 0.96 0.00 0 0
2074 PURBA BARDHAMAN Central Mechanical AUGMENTATION OF GROUND WATER BASED SASINARA ZONE I PWSS TO ACCOMMODATE FHTC IN MEMARI-I BLOCK UNDER BURDWAN SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/10057 Augmentation Quotation for new service connection at Sasinara W/S (Aug) Z-1, TW-3. BILL/00931/2024-2025 BP-2024-25-350 05/10/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 7.88 0.00 0 0
2075 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED SASINARA ZONE I PWSS TO ACCOMMODATE FHTC IN MEMARI-I BLOCK UNDER BURDWAN SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/10057 Augmentation Augmentation of SASINARA ZONE-I Piped Water Supply Scheme with LDS, FHTC, Rising main & Construction of 400 cum capacity OHR with 20.0 mtr. Staging height inclusive of soil investigation under Memari-I Block, District:- Purba-Burdwan. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000127/2022-2023 2971/BWD 30/06/2022 1250 MRITYUNJOY MUKHERJEE & CO. 658.71 491.42 74.6 70
2076 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED SASINARA ZONE I PWSS TO ACCOMMODATE FHTC IN MEMARI-I BLOCK UNDER BURDWAN SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/10057 Augmentation Construction of switch rooms & Rising main at different TW site for SASINARA (Zone-I) Piped Water Supply Scheme under Memari - I Block, District:- Purba-Bardhaman under Burdwan Division, PHE. Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000577/2023-2024 3725/BWD 25/08/2023 615 MOTIONMASS TECHNO (OPC) PRIVATE LIMITED 9.03 0.00 0 90
2077 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED SASINARA ZONE I PWSS TO ACCOMMODATE FHTC IN MEMARI-I BLOCK UNDER BURDWAN SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/10057 Augmentation Replacement of Tube-well & Rising main at HEAD TW SITE for Aug. of BAGILA, SASINARA ZONE-I, SASINARA ZONE-II, Piped Water Supply Scheme within MEMARI-I Block under Burdwan Division, PHE. Dte. District:- Purba-Bardhaman. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000974/2023-2024 027/BWD 03/01/2024 60 KOUSIK MALLICK 38.87 0.00 0 90
2078 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED SASINARA ZONE I PWSS TO ACCOMMODATE FHTC IN MEMARI-I BLOCK UNDER BURDWAN SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/10057 Augmentation Conducting physical Household Survey at the IMIS reported village for HGJ certification and providing balance FHTC for Har Ghar Jal certification including conducting Gram Sabhas for different IMIS reported villages across the district under Burdwan Division, PHE Dte. AE(HQs),Assistant Engineer ,Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE.,Assistant Engineer, Durgapur Sub Division, P.H.E. Dte JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000428/2024-2025 3107/BWD 12/08/2024 323 TUBGRAM GRAMMYAK UNNAYAN SAMITY 309.60 0.00 0 85
2079 PURBA BARDHAMAN Central Mechanical AUGMENTATION OF GROUND WATER BASED SASINARA ZONE I PWSS TO ACCOMMODATE FHTC IN MEMARI-I BLOCK UNDER BURDWAN SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/10057 Augmentation Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Zone- 1 & 2, Tube well No.-3 at Augumentation of SASINARA Water Supply Scheme [BLOCK- MEMARI-I] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER Junior Engineer ORD/000035/2024-2025 2138/CMD 05/07/2024 60 C.M. ENTERPRISE 24.63 11.53 46.81 100
2080 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED SASINARA ZONE I PWSS TO ACCOMMODATE FHTC IN MEMARI-I BLOCK UNDER BURDWAN SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/10057 Augmentation Designing,making and erection of Sign Board for SWAJAL GRAM in Dharmma Simla village of Memari-I Block under Sasinara(Zone-I) Piped Water Supply Scheme within Burdwan Sub-Division under Burdwan Division,PHE Dte (5 Nos. Board) JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000443/2025-2026 2307/BSD 19/08/2025 10 RAJ-N-MAHARAJ MANPOWER & SECURITY SOLUTIONS 0.72 0.00 0 0
2081 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED SASINARA ZONE I PWSS TO ACCOMMODATE FHTC IN MEMARI-I BLOCK UNDER BURDWAN SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/10057 Augmentation Designing, making and erection of Sign Board for SWAJAL GRAM in Chaupira village of Memari-I Block under Sasinara (Zone-I) Piped Water Supply Scheme within Burdwan Sub-Division under Burdwan Division, PHE Dte. (5 nos Board) JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000495/2025-2026 2364/BSD 21/08/2025 10 RAJ-N-MAHARAJ MANPOWER & SECURITY SOLUTIONS 0.72 0.00 0 0
2082 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED SASINARA ZONE I PWSS TO ACCOMMODATE FHTC IN MEMARI-I BLOCK UNDER BURDWAN SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/10057 Augmentation Designing, making and erection of Sign Board for SWAJAL GRAM in Jot Chaitanya village of Memari-I Block under Sasinara(Z-I) Piped Water Supply Scheme within Burdwan Sub-Division under Burdwan Division, PHE Dte (5 nos Board) JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000616/2025-2026 2368/BSD 21/08/2025 10 RAJ-N-MAHARAJ MANPOWER & SECURITY SOLUTIONS 0.72 0.00 0 0
2083 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Hiranyagram Piped Water Supply Scheme at Jamalpur Block , SM/07818 Retrofitting Providing Functional Household Tap Connection (FHTC) at Hiranyagram village within the command area of Hiranyagram Piped Water Supply Scheme at Jamalpur Block under Burdwan Division, PHE Dte. [Group : B] AE(HQs) ORD/000459/2021-2022 67/AE/HQ 11/02/2022 30 APORUPA CONSTRUCTION 4.83 4.62 95.65 1
2084 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Hiranyagram Piped Water Supply Scheme at Jamalpur Block , SM/07818 Retrofitting Material Requisition To Resource Division RTOR000054/2022-2023 5525/BWD 23/12/2022 0 Resource Division 0.62 0.00 0 0
2085 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Hiranyagram Piped Water Supply Scheme at Jamalpur Block , SM/07818 Retrofitting Hire & fuel charges of vehicle (Car No.-WB-41H-9788) for the office of the Assistant Head Quarters, Burdwan Division, PHE Dte. for the month of June & July'22. VCH/000493/2022-2023 460/VEH/22-23 29/08/2022 0 SK. ASRAFUDDIN 0.76 0.00 0 0
2086 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Hiranyagram Piped Water Supply Scheme at Jamalpur Block , SM/07818 Retrofitting Laying of 75mm and 50mm dia. uPVC pipe for providing FHTC at different habitation of Paratal and Ruda Mouza within Hiranyagram Piped Water Supply Scheme, Jamalpur Block under Burdwan Division P.H.E DTE. [Group: ¿B¿] AE(HQs) ORD/000223/2021-2022 1818/AE/HQ 21/09/2021 30 APORUPA CONSTRUCTION 4.74 4.44 93.67 1
2087 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Hiranyagram Piped Water Supply Scheme at Jamalpur Block , SM/07818 Retrofitting Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of Hiranyagram Piped Water Supply Scheme at Ruda Village (2 Nos. habitations), Hiranyagram Village (2 Nos. habitations), Sajipur Village, Basantapur Village (2 Nos. habitations), Parutal Village (2 Nos. habitations), Betragarh Village, Jamalpur Block under Burdwan Division, PHE Dte.[Agreement No. 711/BWD OF 2020-2021.] AE(HQs) ORD/000336/2020-2021 1597/BWD 22/02/2021 60 MANASH GHOSH 93.36 137.75 147.55 1
2088 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Hiranyagram Piped Water Supply Scheme at Jamalpur Block , SM/07818 Retrofitting Continuation order for supply & delivery of different dia CIDF pipes, sluice valve & fittings for construction of RCC OHR (450 cum capacity) for Hiranyagram w/s scheme under Burdwan Division, PHE Dte. AE(HQs) ORD/000692/2021-2022 388/BWD 20/01/2022 20 ASHOKE ENGINEERING WORKS 15.17 0.00 0 1
2089 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Hiranyagram Piped Water Supply Scheme at Jamalpur Block , SM/07818 Retrofitting Providing Functional Household Tap Connection (FHTC) at Paratal village within the command area of HIRANYAGRAM Piped Water Supply Scheme at Jamalpur Block under Burdwan Division, PHE Dte. [Group : C] AE(HQs) ORD/000047/2022-2023 201/AE/HQ 06/04/2022 30 M/S SAYAN CHAKRABORTY 4.85 4.84 99.79 1
2090 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Hiranyagram Piped Water Supply Scheme at Jamalpur Block , SM/07818 Retrofitting Providing Functional Household Tap Connection (FHTC) at Basantaput and Paratal village within the command area of HIRANYAGRAM Piped Water Supply Scheme at Jamalpur Block under Burdwan Division, PHE Dte. [Group : B] AE(HQs) ORD/000041/2022-2023 228/AE/HQ 19/04/2022 30 M/S UNIQUE 4.77 4.66 97.69 1
2091 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Hiranyagram Piped Water Supply Scheme at Jamalpur Block , SM/07818 Retrofitting Construction of boundary wall (North-East Side) at Headworks site of HIRANYAGRAM W/S Scheme under Jamalpur Block of Burdwan Division, PHE Dte. (Length-63Mtr., Column-26Nos.) [Group : E] AE(HQs) ORD/000044/2022-2023 237/AE/HQ 19/04/2022 30 APORUPA CONSTRUCTION 4.83 0.00 0 1
2092 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Hiranyagram Piped Water Supply Scheme at Jamalpur Block , SM/07818 Retrofitting Construction of balance portion of boundary wall at H/W SITE of HIRANYAGRAM Piped W/S. Scheme under Burdwan Division PHE Dte. [Group : C] AE(HQs) ORD/000360/2022-2023 447/AE/HQ 16/08/2022 30 APORUPA CONSTRUCTION 2.98 0.00 0 1
2093 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Hiranyagram Piped Water Supply Scheme at Jamalpur Block , SM/07818 Retrofitting Providing Functional Household Tap Connection (FHTC) at Basantapur and Ruda village within the command area of HIRANYAGRAM Piped Water Supply Scheme at Jamalpur Block under Burdwan Division, PHE Dte. [Group : B] AE(HQs) ORD/000046/2022-2023 200/AE/HQ 06/04/2022 30 DEY NIRMAN 4.85 4.35 89.69 1
2094 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Hiranyagram Piped Water Supply Scheme at Jamalpur Block , SM/07818 Retrofitting Construction of valve chamber and necessary repairing work of pipeline for smooth running of HIRANYAGRAM Piped Water Supply Scheme, Jamalpur Dev. Block under Burdwan Division, P.H.E Dte. AE(HQs) J.E. 2 BURDWAN ORD/000402/2023-2024 387/AE/HQ 26/07/2023 30 SANDIPAN SENGUPTA 0.74 0.74 100 100
2095 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Hiranyagram Piped Water Supply Scheme at Jamalpur Block , SM/07818 Retrofitting Laying of uPVC pipe for providing FHTC at Ruda, Sajipur, Paratal, Betragar Village within Hiranyagram Piped Water Supply Scheme, Jamalpur Block under Burdwan Division P.H.E Dte._Gr-D Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000629/2021-2022 126/AE/HQ 04/03/2022 15 APORUPA CONSTRUCTION 4.64 3.41 73.49 100
2096 PURBA BARDHAMAN Burdwan Division PROVIDING FUNCTIONAL HOUSEHOLD TAP CONNECTION (FHTC) BY RETROFITTING (PHASE III) AT KALYANBATI, NARAYANPUR,RADHKRISHNAPUR & SUDPUR MOUZAS WITHIN THE COMMAND AREA OF SUDPUR PIPED WATER SUPPLY SCHEME AND AT KATWA-I BLOCK UNDER KATWA SUB DIVISION WITHIN BUR , SM/12081 Retrofitting Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of SUDPUR Piped Water Supply Scheme (PART-A) at Katwa-I Block under Burdwan Division, PHE Dte. [Agreement No. 44/2020-2021 OF SE/CC/PHE. DTE.] Assistant Engineer ORD/000058/2020-2021 4290/BWD 03/11/2020 90 MD HASIN 86.85 15.21 17.51 1
2097 PURBA BARDHAMAN Burdwan Division PROVIDING FUNCTIONAL HOUSEHOLD TAP CONNECTION (FHTC) BY RETROFITTING (PHASE III) AT KALYANBATI, NARAYANPUR,RADHKRISHNAPUR & SUDPUR MOUZAS WITHIN THE COMMAND AREA OF SUDPUR PIPED WATER SUPPLY SCHEME AND AT KATWA-I BLOCK UNDER KATWA SUB DIVISION WITHIN BUR , SM/12081 Retrofitting Supply, delivery & installation of submersible pumping machinery, voltage stabiliser, chlorinator and internal house wiring for Tube well No.-3 of Sudpur water supply scheme under CMD PHE Dte. VCH/000758/2022-2023 788/DW/22-23 23/11/2022 0 M.S. ENTERPRISE 9.43 0.00 0 0
2098 PURBA BARDHAMAN Burdwan Division PROVIDING FUNCTIONAL HOUSEHOLD TAP CONNECTION (FHTC) BY RETROFITTING (PHASE III) AT KALYANBATI, NARAYANPUR,RADHKRISHNAPUR & SUDPUR MOUZAS WITHIN THE COMMAND AREA OF SUDPUR PIPED WATER SUPPLY SCHEME AND AT KATWA-I BLOCK UNDER KATWA SUB DIVISION WITHIN BUR , SM/12081 Retrofitting Laying of pipe line parallel to the main line of the existing Distribution System including providing FHTC at Kalyanbati, Narayanpur, Bijoynagar, Purba Bijnagar & Ramkrishnapur village (Mouza) within scheme jurisdiction of SUDPUR Piped W/S. Scheme under Burdwan Division PHE Dte. Assistant Engineer JUNIOR ENGINEER KATWA SUB-DIVISION PHE DTE ORD/000279/2021-2022 6972/BWD 15/12/2021 60 MD HASIN 63.40 13.33 21.03 1
2099 PURBA BARDHAMAN Burdwan Division PROVIDING FUNCTIONAL HOUSEHOLD TAP CONNECTION (FHTC) BY RETROFITTING (PHASE III) AT KALYANBATI, NARAYANPUR,RADHKRISHNAPUR & SUDPUR MOUZAS WITHIN THE COMMAND AREA OF SUDPUR PIPED WATER SUPPLY SCHEME AND AT KATWA-I BLOCK UNDER KATWA SUB DIVISION WITHIN BUR , SM/12081 Retrofitting Balance work of OHR at Head Work site, construction of HUME Pipe culvert , Road restoration work and boundary wall at 2nd TW site with Gate, land development at Head work site and 2nd TW site under KAITHAN, SUDPUR & PANUHAT Piped Water Supply Scheme under KATWA -I Block, under Katwa Sub-Division within Burdwan Division, PHE Dte. Assistant Engineer JUNIOR ENGINEER KATWA SUB-DIVISION PHE DTE ORD/000486/2024-2025 3141/BWD 20/08/2024 120 VISHAL CONSTRUCTION CO. 126.29 0.00 0 50
2100 PURBA BARDHAMAN Burdwan Division PROVIDING FUNCTIONAL HOUSEHOLD TAP CONNECTION (FHTC) BY RETROFITTING (PHASE III) AT KALYANBATI, NARAYANPUR,RADHKRISHNAPUR & SUDPUR MOUZAS WITHIN THE COMMAND AREA OF SUDPUR PIPED WATER SUPPLY SCHEME AND AT KATWA-I BLOCK UNDER KATWA SUB DIVISION WITHIN BUR , SM/12081 Retrofitting Construction of valve Chamber and supply of sluice valve at Sudpur PWSS under Katwa-I Block under Katwa Sub-Division under Burdwan Division, PHE Dte.[Sl No-4] Assistant Engineer JUNIOR ENGINEER KATWA SUB-DIVISION PHE DTE ORD/000372/2023-2024 671/KTS 22/06/2023 30 HAMID SK 0.93 0.93 100 100
2101 PURBA BARDHAMAN Bhatar,Mangolkote Burdwan Division DEBPUR PIPED WATER SUPPLY SCHEME , SM/13398 New Material Requisition To Resource Division RTOR000087/2023-2024 1962/BWD 25/04/2023 0 Resource Division 21.04 0.00 0 0
2102 PURBA BARDHAMAN Bhatar,Mangolkote Burdwan Division DEBPUR PIPED WATER SUPPLY SCHEME , SM/13398 New Material Requisition To Resource Division RTOR000173/2023-2024 2155/BWD 10/05/2023 0 Resource Division 20.38 0.00 0 0
2103 PURBA BARDHAMAN Bhatar,Mangolkote Burdwan Division DEBPUR PIPED WATER SUPPLY SCHEME , SM/13398 New Material Requisition To Resource Division RTOR000640/2023-2024 5106/BWD 23/11/2023 0 Resource Division 20.32 0.00 0 0
2104 PURBA BARDHAMAN Bhatar,Mangolkote Central Mechanical DEBPUR PIPED WATER SUPPLY SCHEME , SM/13398 New New service connection charges for Debpur PWSS TW-1 BILL/01419/2023-2024 BP-2023-24-146 31/08/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 9.73 0.00 0 0
2105 PURBA BARDHAMAN Bhatar,Mangolkote Central Mechanical DEBPUR PIPED WATER SUPPLY SCHEME , SM/13398 New New service connection charges for Debpur PWSS TW-2 BILL/01673/2023-2024 BP-2023-24-224 10/11/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 5.53 0.00 0 0
2106 PURBA BARDHAMAN Bhatar,Mangolkote Burdwan Division DEBPUR PIPED WATER SUPPLY SCHEME , SM/13398 New Continuation order for Supply of 01(one) No. Diesel Driven Motor Cab (Bharat Stage-II) on hire basis for the office of the Assistant Engineer, Durgapur Sub-Division (Burdwan North) P.H.E. Dte. Govt. of West Bengal (for the period of 01/01/2024 to 31/05/2024) Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer1, Durgapur Sub-Division, PHE Dte. ORD/001180/2023-2024 995/DSD 29/12/2023 183 SUJAUDDIN SEKH 2.00 0.30 15 60
2107 PURBA BARDHAMAN Bhatar,Mangolkote Central Mechanical DEBPUR PIPED WATER SUPPLY SCHEME , SM/13398 New Continuation order-Hiring of Inspection Vehicle (Diesel/CNG/LPG Driven ) for supervision of site for the office of the Assistant Engineer,under CMD,PHE,Dte. [W.e.f-29/06/2024 to 31/07/2024] ASSISTANT ENGINEER Junior Engineer ORD/000424/2024-2025 897/CMSD 28/06/2024 33 SUBRATA BHADRA 0.40 0.00 0 0
2108 PURBA BARDHAMAN Bhatar,Mangolkote Central Mechanical DEBPUR PIPED WATER SUPPLY SCHEME , SM/13398 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Karjana & others water supply scheme under Bhatar Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000067/2024-2025 2394/CMD 02/08/2024 90 AHALYA ENGINEERING WORKS 82.00 0.00 0 0
2109 PURBA BARDHAMAN Bhatar,Mangolkote Central Mechanical DEBPUR PIPED WATER SUPPLY SCHEME , SM/13398 New SUPPLY AND INSTALLATION WORKS FOR DEBPUR PWSS BILL/02624/2023-2024 BP-2023-24-557 21/02/2024 0 P.K. ENGINEERING 11.09 0.00 0 0
2110 PURBA BARDHAMAN Bhatar,Mangolkote Burdwan Division DEBPUR PIPED WATER SUPPLY SCHEME , SM/13398 New Different works related (sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of different capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site) to DHENRIA, MAHATA, DEBPUR Piped Water Supply Scheme under BHATAR Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer ,Junior Engineer2, Durgapur Sub-Division, PHE Dte. ORD/000019/2023-2024 1737/BWD 13/04/2023 993 M/S B. RAI CONSTRUCTION COMPANY 1,643.39 317.66 19.33 81
2111 PURBA BARDHAMAN Bhatar Burdwan Division BALSIDANGA PIPED WATER SUPPLY SCHEME , SM/13904 New Material Requisition To Resource Division RTOR000006/2023-2024 1962/BWD 25/04/2023 0 Resource Division 14.19 0.00 0 0
2112 PURBA BARDHAMAN Bhatar Burdwan Division BALSIDANGA PIPED WATER SUPPLY SCHEME , SM/13904 New Material Requisition To Resource Division RTOR000158/2023-2024 2155/BWD 10/05/2023 0 Resource Division 9.50 0.00 0 0
2113 PURBA BARDHAMAN Bhatar Burdwan Division BALSIDANGA PIPED WATER SUPPLY SCHEME , SM/13904 New Material Requisition To Resource Division RTOR000754/2023-2024 5256/BWD 30/11/2023 0 Resource Division 18.50 0.00 0 0
2114 PURBA BARDHAMAN Bhatar Central Mechanical BALSIDANGA PIPED WATER SUPPLY SCHEME , SM/13904 New New service connection charges for Balsidanga PWSS TW-1 BILL/00774/2023-2024 BP-2023-24-71 21/07/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 5.28 0.00 0 0
2115 PURBA BARDHAMAN Bhatar Central Mechanical BALSIDANGA PIPED WATER SUPPLY SCHEME , SM/13904 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Karjana & others water supply scheme under Bhatar Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000067/2024-2025 2394/CMD 02/08/2024 90 AHALYA ENGINEERING WORKS 82.00 0.00 0 0
2116 PURBA BARDHAMAN Bhatar Burdwan Division BALSIDANGA PIPED WATER SUPPLY SCHEME , SM/13904 New BALSIDANGA Piped Water Supply Scheme with sinking of Tube-well, LDS, Rising Main, FHTC & construction of switch rooms & boundary walls with gates and land development, drain and internal pathway at different TW site under BHATAR Block, District:- Purba-Bardhaman [NEW SCHEME]. Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer ORD/000793/2022-2023 1443/BWD 24/03/2023 90 G.S. CONSTRUCTION & CO. 60.82 29.27 48.13 100
2117 PURBA BARDHAMAN Bhatar Burdwan Division BALSIDANGA PIPED WATER SUPPLY SCHEME , SM/13904 New Sinking of 250 X 150 mm dia Tubewell, Construction of pump House, Connection with pump house and Modification to distribution network by making a loop and extension with uPVC pipe to augment the water supply to FHTC at Beldanga and Kanchgoria village of BALSHIDANGA W/S Scheme under Durgapur Sub-Division, Burdwan Division, P.H.E. Dte. Assistant Engineer, Durgapur Sub Division, P.H.E. Dte JUNIOR ENGINEER DURGAPUR SUB-DIVISION PHE DTE ORD/001220/2023-2024 1017/BWD 07/03/2024 60 BAMDEB CONSTRUCTION & CO 40.65 40.65 100 100
2118 PURBA BARDHAMAN Bhatar Central Mechanical BALSIDANGA PIPED WATER SUPPLY SCHEME , SM/13904 New ADDITIONAL QUOTATION NEW SERVICE CONNECTION FOR BALSIDNAGA PWSS TW -1. BILL/03105/2023-2024 BP-2023-24-645 15/03/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 1.04 0.00 0 0
2119 PURBA BARDHAMAN Bhatar Central Mechanical BALSIDANGA PIPED WATER SUPPLY SCHEME , SM/13904 New Quotation for new service connection at Balsidanga PWSS PH-2. BILL/00388/2024-2025 BP-2024-25-203 18/07/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 8.09 0.00 0 0
2120 PURBA BARDHAMAN Bhatar Burdwan Division BALSIDANGA PIPED WATER SUPPLY SCHEME , SM/13904 New Land Development work , Remaining FHTC at Balsidanga Piped Water Supply Scheme , P.H.E Dte. Block:-Bhatar Dist: Purba Bardhaman. Junior Engineer1, Durgapur Sub-Division, PHE Dte. ORD/000315/2025-2026 1064/DSD 24/07/2025 30 KALYAN CHOWDHURY 1.93 0.00 0 100
2121 PURBA BARDHAMAN Khandaghosh Burdwan Division GOPALBERA PIPED WATER SUPPLY SCHEME , SM/13905 New Material Requisition To Resource Division RTOR000105/2023-2024 1965/BWD 26/04/2023 0 Resource Division 9.42 0.00 0 0
2122 PURBA BARDHAMAN Khandaghosh Burdwan Division GOPALBERA PIPED WATER SUPPLY SCHEME , SM/13905 New Material Requisition To Resource Division RTOR000715/2023-2024 5269/BWD 30/11/2023 0 Resource Division 21.07 0.00 0 0
2123 PURBA BARDHAMAN Khandaghosh Burdwan Division GOPALBERA PIPED WATER SUPPLY SCHEME , SM/13905 New Material Requisition To Resource Division RTOR000192/2023-2024 2155/BWD 10/05/2023 0 Resource Division 11.22 0.00 0 0
2124 PURBA BARDHAMAN Khandaghosh Central Mechanical GOPALBERA PIPED WATER SUPPLY SCHEME , SM/13905 New New service connection for Gopalbera PWSS TW -1. BILL/02415/2023-2024 BP-2023-24-513 08/02/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 4.42 0.00 0 0
2125 PURBA BARDHAMAN Khandaghosh Central Mechanical GOPALBERA PIPED WATER SUPPLY SCHEME , SM/13905 New New service connection for Gopalbera PWSS TW -2. BILL/02416/2023-2024 BP-2023-24-514 08/02/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 6.28 0.00 0 0
2126 PURBA BARDHAMAN Khandaghosh Burdwan Division GOPALBERA PIPED WATER SUPPLY SCHEME , SM/13905 New GOPALBERA Piped Water Supply Scheme with sinking of Tube-well, LDS, Rising Main, FHTC, Construction of 300 cum capacity RCC OHR with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drain and internal pathway at different TW site under Khandaghosh Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer1, Durgapur Sub-Division, PHE Dte.,Junior Engineer2, Durgapur Sub-Division, PHE Dte. ORD/000081/2023-2024 2079/BWD 04/05/2023 698 KHAN ENTERPRISE 588.35 436.82 74.24 50
2127 PURBA BARDHAMAN Khandaghosh Central Mechanical GOPALBERA PIPED WATER SUPPLY SCHEME , SM/13905 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at Gopalbera Water Supply Scheme [ Block- Khandoghosh ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER Junior Engineer ORD/000732/2023-2024 4042/CMD 29/08/2023 30 ASHIM UDYOG 28.95 22.76 78.62 100
2128 PURBA BARDHAMAN Khandaghosh Burdwan Division GOPALBERA PIPED WATER SUPPLY SCHEME , SM/13905 New Balance work for providing Functional Household Tap Connection (FHTC) within command area GOPALBERA & CHAGRAM W/S. Scheme of Khandaghosh Block under Burdwan Divn., PHE. Dte. Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer1, Durgapur Sub-Division, PHE Dte. ORD/000959/2024-2025 4438/BWD 18/12/2024 253 DUBE ENTERPRISE 143.33 0.00 0 70
2129 PURBA BARDHAMAN Khandaghosh Central Mechanical GOPALBERA PIPED WATER SUPPLY SCHEME , SM/13905 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at KHEJURHATI & others water supply scheme under Khandoghosh Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman ASSISTANT ENGINEER Junior Engineer ORD/000071/2024-2025 2391/CMD 02/08/2024 90 C.M. ENTERPRISE 45.81 0.00 0 10
2130 PURBA BARDHAMAN Khandaghosh Burdwan Division GOPALBERA PIPED WATER SUPPLY SCHEME , SM/13905 New Continuation for Operation of Distribution System , Rising main, Sluice Valves, including operation of sluice valves of GOPALBERA PWSS within Durgapur Sub-Division under Burdwan Division, PHE Dte. [Period for 01.07.2025 to 30.09.2025]. ORD/000543/2025-2026 1000/DSD 01/07/2025 91 DUBE ENTERPRISE 0.63 0.00 0 0
2131 PURBA BARDHAMAN Memari-I Burdwan Division CHOTKHANDA PIPED WATER SUPPLY SCHEME , SM/13907 New Material Requisition To Resource Division RTOR000236/2023-2024 2197/BWD 12/05/2023 0 Resource Division 7.93 0.00 0 0
2132 PURBA BARDHAMAN Memari-I Burdwan Division CHOTKHANDA PIPED WATER SUPPLY SCHEME , SM/13907 New Material Requisition To Resource Division RTOR000467/2023-2024 3991/BWD 08/09/2023 0 Resource Division 9.08 0.00 0 0
2133 PURBA BARDHAMAN Memari-I Burdwan Division CHOTKHANDA PIPED WATER SUPPLY SCHEME , SM/13907 New Material Requisition To Resource Division RTOR000663/2023-2024 5085/BWD 23/11/2023 0 Resource Division 20.46 0.00 0 0
2134 PURBA BARDHAMAN Memari-I Burdwan Division CHOTKHANDA PIPED WATER SUPPLY SCHEME , SM/13907 New Restoration of concrete road by Cement concrete (mix 1:1.5:3), Providing balance FHTC, parallel pipeline, land development, Sluice valve chamber for smooth water supply of FHTC work for CHOTKHANDA PWSS and its adjoining mouzas within MEMARI-I BLOCK under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000930/2024-2025 4280/BWD 09/12/2024 90 TARAMA AGENCY 21.09 0.00 0 0
2135 PURBA BARDHAMAN Memari-I Central Mechanical CHOTKHANDA PIPED WATER SUPPLY SCHEME , SM/13907 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at SAHAPUR & others water supply scheme under Memari-I Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. ASSISTANT ENGINEER Junior Engineer ORD/000100/2024-2025 2392/CMD 02/08/2024 90 MITRA ENTERPRISE 47.62 0.00 0 0
2136 PURBA BARDHAMAN Memari-I Central Mechanical CHOTKHANDA PIPED WATER SUPPLY SCHEME , SM/13907 New Supply & delivery of different electro-mechanical accessories (for urgent FHTC) for Tube well no.-I & II at Chotkhanda w/s scheme, (Block- Memari-1) under CMD, PHE Dte., Dist.- Purba-Bardhaman ASSISTANT ENGINEER Junior Engineer ORD/001902/2023-2024 540/CMSD 28/03/2024 7 S.K. ENTERPRISE 0.53 0.53 100 100
2137 PURBA BARDHAMAN Memari-I Central Mechanical CHOTKHANDA PIPED WATER SUPPLY SCHEME , SM/13907 New New service connection charges for Chotkhanda PWSS TW-1 BILL/01728/2023-2024 BP-2023-24-244 07/12/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 6.02 0.00 0 0
2138 PURBA BARDHAMAN Memari-I Central Mechanical CHOTKHANDA PIPED WATER SUPPLY SCHEME , SM/13907 New Quotation for new electric service connection at Chotkhanda TW NO.-2 BILL/01740/2023-2024 BP-2023-24-243 07/12/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 7.61 0.00 0 0
2139 PURBA BARDHAMAN Memari-I Burdwan Division CHOTKHANDA PIPED WATER SUPPLY SCHEME , SM/13907 New CHOTKHANDA Piped Water Supply Scheme with sinking of Tube-well, LDS, Rising Main, FHTC, Construction of 350 cum capacity RCC OHR with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drain and internal pathway at different TW site under Memari I Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000123/2023-2024 2306/BWD 19/05/2023 683 ASHOK KUMAR GHOSH 513.64 371.17 72.26 85
2140 PURBA BARDHAMAN Memari-I Central Mechanical CHOTKHANDA PIPED WATER SUPPLY SCHEME , SM/13907 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at Chotkhanda Water Supply Scheme [ Block- Memari-1 ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER Junior Engineer ORD/000731/2023-2024 4041/CMD 29/08/2023 369 S.K. ENTERPRISE 29.59 23.57 79.66 100
2141 PURBA BARDHAMAN Burdwan Division PROVIDING FUNCTIONAL HOUSEHOLD TAP CONNECTION FHTC BY RETROFITTING AT AGRADWIP MOUZA WITHIN THE COMMAND AREA AGRADWIP PIPED WATER SUPPLY SCHEME AT KATWA II BLOCK UNDER BURDWAN DIVISION PHE DTE PART B , SM/13043 Retrofitting Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of AGRADWIP Piped Water Supply Scheme at Agradwip, Babla danga, Gonsaidhowra, Saheb Nagar & Sarawaridhowra (Mouza), Katwa - II Block under Burdwan Division, PHE Dte. Assistant Engineer ORD/000445/2021-2022 6253/BWD 01/11/2021 60 SHUBHRA KANTI GHOSH 53.67 34.17 63.67 1
2142 PURBA BARDHAMAN Burdwan Division PROVIDING FUNCTIONAL HOUSEHOLD TAP CONNECTION FHTC BY RETROFITTING AT AGRADWIP MOUZA WITHIN THE COMMAND AREA AGRADWIP PIPED WATER SUPPLY SCHEME AT KATWA II BLOCK UNDER BURDWAN DIVISION PHE DTE PART B , SM/13043 Retrofitting Providing Functional Household Tap Connection from existing distribution system within the command area of AGRADWIP PWSS under Katwa Sub-Division under Burdwan Division PHE Dte. (Sl No-1) Assistant Engineer ORD/000237/2021-2022 688/KTS 08/10/2021 7 CHANCHAL PAL 1.21 1.20 99.17 1
2143 PURBA BARDHAMAN Burdwan Division PROVIDING FUNCTIONAL HOUSEHOLD TAP CONNECTION FHTC BY RETROFITTING AT AGRADWIP MOUZA WITHIN THE COMMAND AREA AGRADWIP PIPED WATER SUPPLY SCHEME AT KATWA II BLOCK UNDER BURDWAN DIVISION PHE DTE PART B , SM/13043 Retrofitting Extension of pipe line of Providing Functional Household Tap Connection (FHTC) from existing distribution system within command area of Agradwip Water Supply Schame under Agradwip PWSS at Gonsaishowra, & Sarawaridhowar Habitation Katwa-II Block Katwa Sub-Division under Burdwan Division PHE Dte.. [Sl No-05] Assistant Engineer ORD/000608/2021-2022 172/KTS 25/02/2022 7 SHUBHRA KANTI GHOSH 1.32 1.30 98.48 1
2144 PURBA BARDHAMAN Burdwan Division PROVIDING FUNCTIONAL HOUSEHOLD TAP CONNECTION FHTC BY RETROFITTING AT AGRADWIP MOUZA WITHIN THE COMMAND AREA AGRADWIP PIPED WATER SUPPLY SCHEME AT KATWA II BLOCK UNDER BURDWAN DIVISION PHE DTE PART B , SM/13043 Retrofitting Extension of pipe line of Providing Functional Household Tap Connection (FHTC) from existing distribution system within command area of Agradwip Water Supply Schame under Agradwip PWSS at Babla danga and Saheb Nagar Habitation Katwa-II Block Katwa Sub-Division under Burdwan Division PHE Dte.. [Sl No-02] Assistant Engineer ORD/000605/2021-2022 161/KTS 24/02/2022 7 SHUBHRA KANTI GHOSH 2.10 2.08 99.05 1
2145 PURBA BARDHAMAN Burdwan Division PROVIDING FUNCTIONAL HOUSEHOLD TAP CONNECTION FHTC BY RETROFITTING AT AGRADWIP MOUZA WITHIN THE COMMAND AREA AGRADWIP PIPED WATER SUPPLY SCHEME AT KATWA II BLOCK UNDER BURDWAN DIVISION PHE DTE PART B , SM/13043 Retrofitting Supplying and laying of valves along with construction of valve chamber at the existing distribution pipe line of Agradwip PWSS under Katwa Sub-Division under Burdwan Division, PHE Dte [Sl No-04] Assistant Engineer ORD/000157/2022-2023 440/KTS 27/06/2022 30 TAPAS KUMAR ROY 0.78 0.78 100 1
2146 PURBA BARDHAMAN Burdwan Division PROVIDING FUNCTIONAL HOUSEHOLD TAP CONNECTION FHTC BY RETROFITTING AT AGRADWIP MOUZA WITHIN THE COMMAND AREA AGRADWIP PIPED WATER SUPPLY SCHEME AT KATWA II BLOCK UNDER BURDWAN DIVISION PHE DTE PART B , SM/13043 Retrofitting Detail route survey, design of distribution network and preparation of estimate, drawing & DPR for providing FHTC in the scheme AGRADWIP, KHETPUR PALASHI, SAHAPUR PWSS (Sl No-1) Assistant Engineer JUNIOR ENGINEER KATWA SUB-DIVISION PHE DTE ORD/000069/2023-2024 393/KTS 13/04/2023 30 SIRCON ENGINEERING SERVICES 3.71 1.24 33.42 100
2147 PURBA BARDHAMAN Ausgram-II Burdwan Division AMARPUR PIPED WATER SUPPLY SCHEME , SM/13967 New Material Requisition To Resource Division RTOR000043/2023-2024 1962/BWD 25/04/2023 0 Resource Division 9.35 0.00 0 0
2148 PURBA BARDHAMAN Ausgram-II Burdwan Division AMARPUR PIPED WATER SUPPLY SCHEME , SM/13967 New Material Requisition To Resource Division RTOR000208/2023-2024 2155/BWD 10/05/2023 0 Resource Division 20.19 0.00 0 0
2149 PURBA BARDHAMAN Ausgram-II Burdwan Division AMARPUR PIPED WATER SUPPLY SCHEME , SM/13967 New Material Requisition To Resource Division RTOR000611/2023-2024 4932/BWD 10/11/2023 0 Resource Division 30.36 0.00 0 0
2150 PURBA BARDHAMAN Ausgram-II Burdwan Division AMARPUR PIPED WATER SUPPLY SCHEME , SM/13967 New Sinking of Tube-wells, LDS, Rising Main, FHTC, Construction of 200 cum capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation, construction of switch rooms, boundary walls with gates, land development, internal drains and internal pathways for AMARPUR Piped Water Supply Scheme under Ausgram-II Block, District:- Purba-Bardhaman [NEW SCHEME] ORD/000820/2023-2024 4952/BWD 17/11/2023 365 SUJAY KUMAR RAY 344.32 145.10 42.14 50
2151 PURBA BARDHAMAN Ausgram-II Central Mechanical AMARPUR PIPED WATER SUPPLY SCHEME , SM/13967 New NEW SERVICE CONNECTION FOR AMARPUR PWSS PH 2. BILL/02867/2023-2024 BP-2023-24-605 06/03/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 2.88 0.00 0 0
2152 PURBA BARDHAMAN Ausgram-II Central Mechanical AMARPUR PIPED WATER SUPPLY SCHEME , SM/13967 New NEW SERVICE CONNECTION FOR AMARPUR PWSS PH 1. BILL/02866/2023-2024 BP-2023-24-604 06/03/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.37 0.00 0 0
2153 PURBA BARDHAMAN Ausgram-II Central Mechanical AMARPUR PIPED WATER SUPPLY SCHEME , SM/13967 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Chora, Kalaijhuti & others water supply scheme under Ausgram-2 Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. Driller In-Charge JUNIOR ENGINEER ORD/000143/2024-2025 2405/CMD 02/08/2024 90 NABAUDYOG ELECTRICAL ENGINEERING CO-OPERATIVE SOCIETY LTD 95.26 0.00 0 80
2154 PURBA BARDHAMAN Ausgram-II Durgapur W/S Division AMARPUR PIPED WATER SUPPLY SCHEME , SM/13967 New Formal Work Order for Additional work for laying 200 mm dia HDPE pipe line and other necessary allied works Amarpur & Bhedia Piped W/S Scheme, Block- Aushgram-2, Dist- Purba Bardhaman under Durgapur W/S Division, PHE Dte. Assistant Engineer-II JUNIOR ENGINEER-1,JUNIOR ENGINEER-2 ORD/000141/2024-2025 1291/DWSD 06/09/2024 210 SAIKAT RAY 196.61 9.11 4.63 60
2155 PURBA BARDHAMAN Purbasthali-I Burdwan Division MANGANPUR PIPED WATER SUPPLY SCHEME , SM/13327 New Material Requisition To Resource Division RTOR000339/2023-2024 2197/BWD 12/05/2023 0 Resource Division 11.02 0.00 0 0
2156 PURBA BARDHAMAN Purbasthali-I Burdwan Division MANGANPUR PIPED WATER SUPPLY SCHEME , SM/13327 New Material Requisition To Resource Division RTOR000475/2023-2024 3999/BWD 08/09/2023 0 Resource Division 3.31 0.00 0 0
2157 PURBA BARDHAMAN Purbasthali-I Central Mechanical MANGANPUR PIPED WATER SUPPLY SCHEME , SM/13327 New New service connection charges for Manganpur PWSS TW-1 BILL/01670/2023-2024 BP-2023-24-227 10/11/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 9.63 0.00 0 0
2158 PURBA BARDHAMAN Purbasthali-I Central Mechanical MANGANPUR PIPED WATER SUPPLY SCHEME , SM/13327 New Supply & Installation of Submersible Pumping Machinery , Voltage Stabilizer, Chlorination System and Internal House wiring for Tube well no.- 1 & 2 at MANGANPUR Water Supply Scheme [Block-PURBASTHALI-1] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000730/2023-2024 4040/CMD 29/08/2023 30 SOUNAK ENTERPRISE 22.10 10.00 45.25 50
2159 PURBA BARDHAMAN Purbasthali-I Central Mechanical MANGANPUR PIPED WATER SUPPLY SCHEME , SM/13327 New Supply and delivery of portable generator set for emergency internal installation work at Manganpur and other Water Supply Scheme under CMD., PHE Dte. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/001419/2023-2024 153/CMSD 22/01/2024 15 M/S, MONDAL ASSOCIATES. 2.11 2.11 100 100
2160 PURBA BARDHAMAN Purbasthali-I Burdwan Division MANGANPUR PIPED WATER SUPPLY SCHEME , SM/13327 New Material Requisition To Resource Division RTOR000802/2023-2024 315/BWD 24/01/2024 0 Resource Division 17.52 0.00 0 0
2161 PURBA BARDHAMAN Purbasthali-I Burdwan Division MANGANPUR PIPED WATER SUPPLY SCHEME , SM/13327 New Different works related (sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of different capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site) to MANGANPUR & BAGPUR Piped Water Supply Scheme under Purbasthali-I Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000391/2023-2024 3200/BWD 24/07/2023 1100 M/S GHOSH & CO. 711.81 180.13 25.31 10
2162 PURBA BARDHAMAN Purbasthali-I Burdwan Division MANGANPUR PIPED WATER SUPPLY SCHEME , SM/13327 New Different types of works involve in connection with Augmentation of SRIRAMPUR (Zone I & II) (SM/08103), MANGANPUR (SM/13327), KAMALPUR (SM/13453) Piped Water Supply Scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000190/2024-2025 2429/BWD 27/06/2024 480 S.P. CONSTRUCTION 500.89 158.83 31.71 2
2163 PURBA BARDHAMAN Purbasthali-I Central Mechanical MANGANPUR PIPED WATER SUPPLY SCHEME , SM/13327 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Haripur & others water supply scheme under purbasthali 1 Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000072/2024-2025 2397/CMD 02/08/2024 90 CHATTERJEE ENTERPRISE 48.60 0.00 0 30
2164 PURBA BARDHAMAN Purbasthali-I Central Mechanical MANGANPUR PIPED WATER SUPPLY SCHEME , SM/13327 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Manganpur & others water supply scheme under Purbasthali 1 Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000714/2024-2025 2979/CMD 25/11/2024 90 H.K. DAS & CO. 53.27 0.00 0 0
2165 PURBA BARDHAMAN Manteswar Burdwan Division Ground Water Supply Based Piped Water Supply Scheme For DHENUA PWSS in Manteshwar Block of Purab Burdwan District under Burdwan Division, PHE Dte. , SM/13331 New Material Requisition To Resource Division RTOR000244/2023-2024 2197/BWD 12/05/2023 0 Resource Division 4.24 0.00 0 0
2166 PURBA BARDHAMAN Manteswar Burdwan Division Ground Water Supply Based Piped Water Supply Scheme For DHENUA PWSS in Manteshwar Block of Purab Burdwan District under Burdwan Division, PHE Dte. , SM/13331 New Material Requisition To Resource Division RTOR000448/2023-2024 3972/BWD 08/09/2023 0 Resource Division 108.75 0.00 0 0
2167 PURBA BARDHAMAN Manteswar Central Mechanical Ground Water Supply Based Piped Water Supply Scheme For DHENUA PWSS in Manteshwar Block of Purab Burdwan District under Burdwan Division, PHE Dte. , SM/13331 New NEW SERVICE CONNECTION FOR DHENUA PWSS. BILL/02689/2023-2024 BP-2023-24-564 23/02/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 5.21 0.00 0 0
2168 PURBA BARDHAMAN Manteswar Central Mechanical Ground Water Supply Based Piped Water Supply Scheme For DHENUA PWSS in Manteshwar Block of Purab Burdwan District under Burdwan Division, PHE Dte. , SM/13331 New NEW SERVICE CONNECTION FOR DHENUA PWSS TW -1. BILL/03101/2023-2024 BP-2023-24-641 15/03/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 7.52 0.00 0 0
2169 PURBA BARDHAMAN Manteswar Burdwan Division Ground Water Supply Based Piped Water Supply Scheme For DHENUA PWSS in Manteshwar Block of Purab Burdwan District under Burdwan Division, PHE Dte. , SM/13331 New Different works related (sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of different capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site) to DHENUA, IBRAMBAD & UJNA Piped Water Supply Scheme under Manteswar Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer ,JUNIOR ENGINEER DURGAPUR SUB-DIVISION PHE DTE ORD/000462/2023-2024 3456/BWD 08/08/2023 855 M/S S. CHOUDHURY 2,123.70 163.77 7.71 20
2170 PURBA BARDHAMAN Manteswar Burdwan Division Ground Water Supply Based Piped Water Supply Scheme For DHENUA PWSS in Manteshwar Block of Purab Burdwan District under Burdwan Division, PHE Dte. , SM/13331 New Arrangement of drinking water supply by installation of solar submersible pump including sinking of 200 mm. dia. Tube well 150 Mtr. Deep by direct rotary rig method, Laying dist. System, FHTC and 2 Nos. 5000 Ltr. PVC tank installation with construction of RCC structure for SAHAPUR Habitation which is uncovered of DHENUA Piped W/S. Scheme, Block Manteswar under Burdwan Division, PHE Dte. Assistant Engineer, Durgapur Sub Division, P.H.E. Dte JUNIOR ENGINEER DURGAPUR SUB-DIVISION PHE DTE ORD/000687/2024-2025 3668/BWD 22/10/2024 360 UJJWAL MUKHERJEE 34.32 0.00 0 50
2171 PURBA BARDHAMAN Manteswar Burdwan Division Ground Water Supply Based Piped Water Supply Scheme For DHENUA PWSS in Manteshwar Block of Purab Burdwan District under Burdwan Division, PHE Dte. , SM/13331 New Arrangement of drinking water supply by installation of solar submersible pump including sinking of 200 mm. dia. Tube well 150 Mtr. Deep by direct rotary rig method, Laying dist. System, FHTC and 2 Nos. 5000 Ltr. PVC tank installation with construction of RCC structure for RUIGORIA Habitation which is uncovered of DHENUA Piped W/S. Scheme, Block Manteswar under Burdwan Division, PHE Dte. Assistant Engineer, Durgapur Sub Division, P.H.E. Dte JUNIOR ENGINEER DURGAPUR SUB-DIVISION PHE DTE ORD/000686/2024-2025 3667/BWD 22/10/2024 90 UJJWAL MUKHERJEE 31.83 0.00 0 0
2172 PURBA BARDHAMAN Manteswar Central Mechanical Ground Water Supply Based Piped Water Supply Scheme For DHENUA PWSS in Manteshwar Block of Purab Burdwan District under Burdwan Division, PHE Dte. , SM/13331 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Sutra & others water supply scheme under Monteswar Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000068/2024-2025 2396/CMD 02/08/2024 455 SINHA ELECTRICALS 78.06 0.00 0 20
2173 PURBA BARDHAMAN Manteswar Central Mechanical Ground Water Supply Based Piped Water Supply Scheme For DHENUA PWSS in Manteshwar Block of Purab Burdwan District under Burdwan Division, PHE Dte. , SM/13331 New CONTINUATION ORDER-Hiring of inspection vehicle (Diesel/CNG/LPG Driven) for supervision of site for the office of the Assistant Engineer ,under CMD,PHE,Dte.[W.E.F-31/01/2025 TO 31/03/2025][UNDER JJM WORKS] ASSISTANT ENGINEER Junior Engineer ORD/000778/2024-2025 110/CMSD 30/01/2025 60 PRODYUT GHOSH 0.79 0.79 100 0
2174 PURBA BARDHAMAN Bhatar Burdwan Division MANDARDIHI PIPED WATER SUPPLY SCHEME , SM/14052 New Material Requisition To Resource Division RTOR000080/2022-2023 1238/BWD 17/03/2023 0 Resource Division 2.16 0.00 0 0
2175 PURBA BARDHAMAN Bhatar Burdwan Division MANDARDIHI PIPED WATER SUPPLY SCHEME , SM/14052 New Material Requisition To Resource Division RTOR000752/2023-2024 5247/BWD 30/11/2023 0 Resource Division 18.50 0.00 0 0
2176 PURBA BARDHAMAN Bhatar Central Mechanical MANDARDIHI PIPED WATER SUPPLY SCHEME , SM/14052 New New service connection charges for Mandardihi PWSS TW-2 BILL/01420/2023-2024 BP-2023-24-148 31/08/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.15 0.00 0 0
2177 PURBA BARDHAMAN Bhatar Central Mechanical MANDARDIHI PIPED WATER SUPPLY SCHEME , SM/14052 New New service connection charges for Mandardihi PWSS TW-1 BILL/01050/2023-2024 BP-2023-24-119 17/08/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 5.61 0.00 0 0
2178 PURBA BARDHAMAN Bhatar Central Mechanical MANDARDIHI PIPED WATER SUPPLY SCHEME , SM/14052 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at MANDARDIHI Water Supply Scheme [ Block- BHATAR] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000359/2023-2024 3504/CMD 31/07/2023 668 S.K. ELECTRICALS 26.96 18.81 69.77 90
2179 PURBA BARDHAMAN Bhatar Central Mechanical MANDARDIHI PIPED WATER SUPPLY SCHEME , SM/14052 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Karjana & others water supply scheme under Bhatar Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000067/2024-2025 2394/CMD 02/08/2024 90 AHALYA ENGINEERING WORKS 82.00 0.00 0 0
2180 PURBA BARDHAMAN Bhatar Burdwan Division MANDARDIHI PIPED WATER SUPPLY SCHEME , SM/14052 New MANDARDIHI (PART:-B) Piped Water Supply Scheme with LDS & FHTC [NODE POINT 49 TO 77] under Bhatar Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer ORD/000717/2022-2023 919/BWD 02/03/2023 30 PAPRI HAZRA 18.89 17.17 90.89 100
2181 PURBA BARDHAMAN Bhatar Burdwan Division MANDARDIHI PIPED WATER SUPPLY SCHEME , SM/14052 New MANDARDIHI (PART:-A) Piped Water Supply Scheme with sinking of Tube-well, LDS, Rising Main, FHTC & construction of switch rooms & boundary walls with gates and land development, drain and internal pathway at different TW site under Bhatar Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer2, Durgapur Sub-Division, PHE Dte. ORD/000719/2022-2023 928/BWD 02/03/2023 60 DUBE ENTERPRISE 63.01 63.00 99.98 30
2182 PURBA BARDHAMAN Bhatar Central Mechanical MANDARDIHI PIPED WATER SUPPLY SCHEME , SM/14052 New Emergency installation (for urgent FHTC) at Mandardihi Water Supply Scheme PH 2 (part-3) under CMD, PHE Dte., Dist.- Purba-Bardhaman ASSISTANT ENGINEER JUNIOR ENGINEER ORD/001676/2023-2024 83/CMSD 15/01/2024 12 CHOUDHURY ENTERPRISE 0.92 0.92 100 100
2183 PURBA BARDHAMAN Bhatar Central Mechanical MANDARDIHI PIPED WATER SUPPLY SCHEME , SM/14052 New Supply and delivery of different Electro-mechanical items (for urgent FHTC) for Mandardihi Water Supply Scheme PH 2 (part-1) under CMD, PHE Dte., Dist.- Purba-Bardhaman ASSISTANT ENGINEER JUNIOR ENGINEER ORD/001748/2023-2024 19/CMSD 04/01/2024 10 CHOUDHURY ENTERPRISE 0.91 0.91 100 100
2184 PURBA BARDHAMAN Bhatar Central Mechanical MANDARDIHI PIPED WATER SUPPLY SCHEME , SM/14052 New Supply and delivery of submersible pumping machinery (for urgent FHTC) for mandardihi Water Supply Scheme PH 2 (part-2) under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/001672/2023-2024 66/CMSD 11/01/2024 12 CHOUDHURY ENTERPRISE 0.81 0.81 100 100
2185 PURBA BARDHAMAN Katwa-II Burdwan Division JAGADANANDAPUR PIPED WATER SUPPLY SCHEME , SM/14054 New Material Requisition To Resource Division RTOR000062/2022-2023 1246/BWD 17/03/2023 0 Resource Division 17.02 0.00 0 0
2186 PURBA BARDHAMAN Katwa-II Burdwan Division JAGADANANDAPUR PIPED WATER SUPPLY SCHEME , SM/14054 New Material Requisition To Resource Division RTOR000096/2022-2023 1638/BWD 06/04/2023 0 Resource Division 1.10 0.00 0 0
2187 PURBA BARDHAMAN Katwa-II Central Mechanical JAGADANANDAPUR PIPED WATER SUPPLY SCHEME , SM/14054 New New service connection charges for Jagadanandapur PWSS TW-2 BILL/00797/2023-2024 BP-2023-24-85 26/07/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 5.95 0.00 0 0
2188 PURBA BARDHAMAN Katwa-II Central Mechanical JAGADANANDAPUR PIPED WATER SUPPLY SCHEME , SM/14054 New New service connection charges for Jagadanandapur W/S Scheme TW-1 BILL/00694/2023-2024 BP-2023-24-36 27/06/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.38 0.00 0 0
2189 PURBA BARDHAMAN Katwa-II Burdwan Division JAGADANANDAPUR PIPED WATER SUPPLY SCHEME , SM/14054 New JAGADANANDAPUR Piped Water Supply Scheme with sinking of Tube-well, LDS, Rising Main, FHTC, Construction of 400 cum capacity RCC OHR with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drain and internal pathway at different TW site under KATWA -II Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer JUNIOR ENGINEER KATWA SUB-DIVISION PHE DTE ORD/000711/2022-2023 777/BWD 24/02/2023 677 MANASH GHOSH 562.08 469.00 83.44 78
2190 PURBA BARDHAMAN Katwa-II Burdwan Division JAGADANANDAPUR PIPED WATER SUPPLY SCHEME , SM/14054 New Continuation Work Order for Supply of 1 (one) No. Inspection Vehicle for different JJM Related Works as and when required including supply of driver and fuels (Minimum 8 Hours of duty) under Katwa Sub-Division within Burdwan Division, P.H.E. Dte. Consider 96.00 Km run per Day Assistant Engineer JUNIOR ENGINEER KATWA SUB-DIVISION PHE DTE ORD/000683/2024-2025 1009/KTS 19/07/2024 60 AJIT SAMANTA 0.77 0.17 22.08 100
2191 PURBA BARDHAMAN Katwa-II Central Mechanical JAGADANANDAPUR PIPED WATER SUPPLY SCHEME , SM/14054 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Mulgram & others water supply scheme under Katwa-II Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. ASSISTANT ENGINEER Junior Engineer ORD/000070/2024-2025 2409/CMD 02/08/2024 90 DUTTA ENTERPRISE 50.18 0.00 0 0
2192 PURBA BARDHAMAN Katwa-II Central Mechanical JAGADANANDAPUR PIPED WATER SUPPLY SCHEME , SM/14054 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at Jagadanandapur Water Supply Scheme [ Block- KATWA-2 ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. Driller In-Charge Junior Engineer ORD/000126/2023-2024 2659/CMD 16/06/2023 30 PADMA ENGINEERING CO. 28.97 21.56 74.42 60
2193 PURBA BARDHAMAN Katwa-II Burdwan Division JAGADANANDAPUR PIPED WATER SUPPLY SCHEME , SM/14054 New Material Requisition To Resource Division RTOR000786/2023-2024 327/BWD 24/01/2024 0 Resource Division 22.74 0.00 0 0
2194 PURBA BARDHAMAN Kalna-I Burdwan Division DEARA PIPED WATER SUPPLY SCHEME , SM/14435 New Material Requisition To Resource Division RTOR000091/2022-2023 1640/BWD 06/04/2023 0 Resource Division 4.70 0.00 0 0
2195 PURBA BARDHAMAN Kalna-I Burdwan Division DEARA PIPED WATER SUPPLY SCHEME , SM/14435 New Material Requisition To Resource Division RTOR000087/2022-2023 1237/BWD 17/03/2023 0 Resource Division 10.42 0.00 0 0
2196 PURBA BARDHAMAN Kalna-I Burdwan Division DEARA PIPED WATER SUPPLY SCHEME , SM/14435 New Material Requisition To Resource Division RTOR000515/2023-2024 3967/BWD 08/09/2023 0 Resource Division 19.84 0.00 0 0
2197 PURBA BARDHAMAN Kalna-I Burdwan Division DEARA PIPED WATER SUPPLY SCHEME , SM/14435 New Material Requisition To Resource Division RTOR000638/2023-2024 5093/BWD 23/11/2023 0 Resource Division 21.42 0.00 0 0
2198 PURBA BARDHAMAN Kalna-I Central Mechanical DEARA PIPED WATER SUPPLY SCHEME , SM/14435 New New service connection charges for Deara PWSS TW-1 BILL/01669/2023-2024 BP-2023-24-222 10/11/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 5.46 0.00 0 0
2199 PURBA BARDHAMAN Kalna-I Central Mechanical DEARA PIPED WATER SUPPLY SCHEME , SM/14435 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Joykrishnapur & others water supply scheme under Purbasthali-2,jamalpur,kalna 1 Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000101/2024-2025 2398/CMD 02/08/2024 90 MS S G ENTERPRISE 53.43 0.00 0 0
2200 PURBA BARDHAMAN Kalna-I Burdwan Division DEARA PIPED WATER SUPPLY SCHEME , SM/14435 New Work Order for "Supply of 1 (one) No. Diesel driven Motor cab (Inspection vehicle) on hire basis for JJM projects for the Office of the Assistant Engineer, under Kalna Sub-Division within Burdwan Division, P.H.E. Dte. [Period for 3 (Three) Months]". Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000668/2023-2024 1333/KSD 28/08/2023 72 PARTHA PRATIM ACHARYA 0.92 0.81 88.04 100
2201 PURBA BARDHAMAN Kalna-I Burdwan Division DEARA PIPED WATER SUPPLY SCHEME , SM/14435 New Work order for "CONSTRUCTION OF TEMPORARY KIOSK FOR THE NECESSARY ARRANGEMENT OF ELECTRIFICATION OF TUBEWELL FOR DEARA PWSS UNDER KALNA SUB-DIVISION UNDER BURDWAN DIVISION, PHE DTE." Assistant Engineer Junior Engineer, R.W.S. Burdwan Sub Division, P.H.E. Dt ORD/001143/2023-2024 1979/KSD 09/02/2024 10 ER CONSTRUCTION & GENERAL ORDER SUPPLIER 0.66 0.66 100 100
2202 PURBA BARDHAMAN Kalna-I Central Mechanical DEARA PIPED WATER SUPPLY SCHEME , SM/14435 New New service connection for DEARA PWSS BILL/02561/2023-2024 BP-2023-24-544 19/02/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 8.53 0.00 0 0
2203 PURBA BARDHAMAN Kalna-I Burdwan Division DEARA PIPED WATER SUPPLY SCHEME , SM/14435 New Different works related (sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of different capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site) to DEARA, PATHARDANGA & SHIKARPUR Piped Water Supply Scheme under KALNA-I Block, District:- Purba Bardhaman [NEW SCHEME] Assistant Engineer Junior Engineer, R.W.S. Burdwan Sub Division, P.H.E. Dt ORD/000734/2022-2023 1004/BWD 06/03/2023 365 M/S TAPAS KUMAR CHAKRABORTY 1,584.09 296.81 18.74 75
2204 PURBA BARDHAMAN Kalna-I Burdwan Division DEARA PIPED WATER SUPPLY SCHEME , SM/14435 New Supply & Laying of 300mm Dia M.S.E.R.W Pipe including Jack Pushing along with other allied work in connection with different Augmentation & New [(SM/18439, SM/14437, SM/14435, SM/07805, SM/14440, SM/15571, SM/08030, SM/16014, SM/15588, SM/16298 & SM/16307)] under Kalna Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/001187/2024-2025 608/BWD 11/02/2025 361 MANASH GHOSH 1,209.62 0.00 0 51
2205 PURBA BARDHAMAN Bhatar Burdwan Division NASIGRAM PIPED WATER SUPPLY SCHEME , SM/14443 New Supply of Inspection Vehicle for inspection of different JJM related (Schemes) works as and when required including supply of driver & fuel (minimum 8 Hours duty per day) and all taxes etc. for Durgapur Sub-Division under Burdwan Division, P.H.E. Dte. consider 96.00 Km. run per day.[Period from 01/08/2023 to 31/10/2023] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer2, Durgapur Sub-Division, PHE Dte. ORD/000420/2023-2024 593/DSD 31/07/2023 66 AFIBS ENTERPRISE 0.85 0.83 97.65 100
2206 PURBA BARDHAMAN Bhatar Burdwan Division NASIGRAM PIPED WATER SUPPLY SCHEME , SM/14443 New Material Requisition To Resource Division RTOR000071/2023-2024 1962/BWD 25/04/2023 0 Resource Division 27.18 0.00 0 0
2207 PURBA BARDHAMAN Bhatar Burdwan Division NASIGRAM PIPED WATER SUPPLY SCHEME , SM/14443 New Material Requisition To Resource Division RTOR000176/2023-2024 2155/BWD 10/05/2023 0 Resource Division 17.06 0.00 0 0
2208 PURBA BARDHAMAN Bhatar Burdwan Division NASIGRAM PIPED WATER SUPPLY SCHEME , SM/14443 New Material Requisition To Resource Division RTOR000583/2023-2024 4897/BWD 10/11/2023 0 Resource Division 38.94 0.00 0 0
2209 PURBA BARDHAMAN Bhatar Central Mechanical NASIGRAM PIPED WATER SUPPLY SCHEME , SM/14443 New New service connection charges for Nasigram PWSS TW-1 BILL/00772/2023-2024 BP-2023-24-72 21/07/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 5.83 0.00 0 0
2210 PURBA BARDHAMAN Bhatar Central Mechanical NASIGRAM PIPED WATER SUPPLY SCHEME , SM/14443 New New service connection charges for Nasigram PWSS TW-2 BILL/00773/2023-2024 BP-2023-24-73 21/07/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.19 0.00 0 0
2211 PURBA BARDHAMAN Bhatar Burdwan Division NASIGRAM PIPED WATER SUPPLY SCHEME , SM/14443 New Continuation Supply of Inspection Vehicle for inspection of different JJM related (Schemes) works as and when required including supply of driver & fuel (minimum 8 Hours duty per day) and all taxes etc. for Durgapur Sub-Division under Burdwan Division, P.H.E. Dte. consider 96.00 Km. run per day.[Period from 01/11/2023 to 31/01/2024] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer2, Durgapur Sub-Division, PHE Dte. ORD/001210/2023-2024 825/DSD 31/10/2023 66 AFIBS ENTERPRISE 0.85 0.28 32.94 100
2212 PURBA BARDHAMAN Bhatar Burdwan Division NASIGRAM PIPED WATER SUPPLY SCHEME , SM/14443 New Making connection with 4th tube well, Construction of Plinth protection of OHR, Restoration of road and FHTC (The rest portion) of Bara Belun Water Supply Scheme at Bara Belun village & Providing Functional Household Tap Connection (FHTC) within the command area of NASIGRAM Piped W/S. Scheme within Bhatar Block under Burdwan Division, PHE. Dte. Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer2, Durgapur Sub-Division, PHE Dte. ORD/000690/2024-2025 3685/BWD 23/10/2024 120 INDIAN ENGINEERS CO.-OPERATIVE SOCIETY LTD. 91.48 0.00 0 0
2213 PURBA BARDHAMAN Bhatar Central Mechanical NASIGRAM PIPED WATER SUPPLY SCHEME , SM/14443 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Karjana & others water supply scheme under Bhatar Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000067/2024-2025 2394/CMD 02/08/2024 90 AHALYA ENGINEERING WORKS 82.00 0.00 0 0
2214 PURBA BARDHAMAN Bhatar Burdwan Division NASIGRAM PIPED WATER SUPPLY SCHEME , SM/14443 New Continuation Supply of Inspection Vehicle for inspection of different JJM related (Schemes) works as and when required including supply of driver & fuel (minimum 8 Hours duty per day) and all taxes etc. for Durgapur Sub-Division under Burdwan Division, P.H.E. Dte. consider 96.00 Km. run per day.[Period from 01/11/2023 to 31/01/2024] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer2, Durgapur Sub-Division, PHE Dte. ORD/000755/2023-2024 825/DSD 31/10/2023 66 AFIBS ENTERPRISE 0.85 1.13 132.94 100
2215 PURBA BARDHAMAN Bhatar Central Mechanical NASIGRAM PIPED WATER SUPPLY SCHEME , SM/14443 New NEW SERVICE CONNECTION FOR NASIGRAM PWSS BILL/02592/2023-2024 BP-2023-24-574 27/02/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 5.54 0.00 0 0
2216 PURBA BARDHAMAN Bhatar Burdwan Division NASIGRAM PIPED WATER SUPPLY SCHEME , SM/14443 New NASIGRAM Piped Water Supply Scheme with sinking of Tube-well, LDS, Rising Main, FHTC, Construction of 450 cum capacity RCC OHR with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drain and internal pathway at different TW site under Bhatar Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer1, Durgapur Sub-Division, PHE Dte.,Junior Engineer2, Durgapur Sub-Division, PHE Dte. ORD/000050/2023-2024 1826/BWD 19/04/2023 742 MD HASIN 742.95 499.95 67.29 50
2217 PURBA BARDHAMAN Ketugram-II Burdwan Division GURPARA PIPED WATER SUPPLY SCHEME , SM/14447 New Material Requisition To Resource Division RTOR000063/2023-2024 1962/BWD 25/04/2023 0 Resource Division 9.42 0.00 0 0
2218 PURBA BARDHAMAN Ketugram-II Burdwan Division GURPARA PIPED WATER SUPPLY SCHEME , SM/14447 New Material Requisition To Resource Division RTOR000150/2023-2024 2155/BWD 10/05/2023 0 Resource Division 17.31 0.00 0 0
2219 PURBA BARDHAMAN Ketugram-II Burdwan Division GURPARA PIPED WATER SUPPLY SCHEME , SM/14447 New Material Requisition To Resource Division RTOR000625/2023-2024 4871/BWD 10/11/2023 0 Resource Division 29.60 0.00 0 0
2220 PURBA BARDHAMAN Ketugram-II Central Mechanical GURPARA PIPED WATER SUPPLY SCHEME , SM/14447 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Kankurhati & others water supply scheme under Ketugram-2 Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. Driller In-Charge Junior Engineer ORD/000103/2024-2025 2408/CMD 02/08/2024 90 DIPALI CONSTRUCTION 41.95 0.00 0 0
2221 PURBA BARDHAMAN Ketugram-II Central Mechanical GURPARA PIPED WATER SUPPLY SCHEME , SM/14447 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at Gurpara Water Supply Scheme [ Block- Ketugram-2 ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. Driller In-Charge Junior Engineer ORD/000749/2023-2024 4059/CMD 29/08/2023 30 ANANTA ELECTRICAL ENGINEERING CONSTRUCTION 26.93 21.07 78.24 91
2222 PURBA BARDHAMAN Ketugram-II Central Mechanical GURPARA PIPED WATER SUPPLY SCHEME , SM/14447 New Quotation for new service connection at Gurpara W/S Scheme PH-I. BILL/01809/2023-2024 BP-2023-24-308 30/12/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 4.28 0.00 0 0
2223 PURBA BARDHAMAN Ketugram-II Central Mechanical GURPARA PIPED WATER SUPPLY SCHEME , SM/14447 New New service connection at Guyrpara PWSS TW No.2 BILL/02376/2023-2024 BP-2023-24-488 01/02/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 4.90 0.00 0 0
2224 PURBA BARDHAMAN Ketugram-II Burdwan Division GURPARA PIPED WATER SUPPLY SCHEME , SM/14447 New Different works related (sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of different capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site) to BILLESWAR, GURPARA & PURULIA Piped Water Supply Scheme under KETUGRAM-II Block, District:- Purba Bardhaman [NEW SCHEME] Assistant Engineer JUNIOR ENGINEER KATWA SUB-DIVISION PHE DTE,JUNIOR ENGINEER R.W.S. BURDWAN SUB-DIVISION PHE DTE ORD/000038/2023-2024 1821/BWD 18/04/2023 897 PASCON 1,118.33 220.02 19.67 46
2225 PURBA BARDHAMAN Ketugram-II Burdwan Division GURPARA PIPED WATER SUPPLY SCHEME , SM/14447 New Balance work of OHR, construction Concrete Road, Drum Sheet Pilling, Functional Household Tap Connection, construction of HUME Pipe culvert, land development, Road restoration etc. under Billeswar PWSS, Purulia PWSS & Gurpara PWSS under KATWA -II Block under Katwa Sub-Divn. under Burdwan Division, PHED. District:- Purba-Bardhaman Assistant Engineer JUNIOR ENGINEER KATWA SUB-DIVISION PHE DTE ORD/000310/2024-2025 2834/BWD 19/07/2024 467 PASCON 190.06 0.00 0 90
2226 PURBA BARDHAMAN Bhatar Burdwan Division NABASTA PIPED WATER SUPPLY SCHEME , SM/14059 New Material Requisition To Resource Division RTOR000077/2023-2024 1962/BWD 25/04/2023 0 Resource Division 80.57 0.00 0 0
2227 PURBA BARDHAMAN Bhatar Burdwan Division NABASTA PIPED WATER SUPPLY SCHEME , SM/14059 New Material Requisition To Resource Division RTOR000348/2023-2024 2197/BWD 12/05/2023 0 Resource Division 3.49 0.00 0 0
2228 PURBA BARDHAMAN Bhatar Burdwan Division NABASTA PIPED WATER SUPPLY SCHEME , SM/14059 New Material Requisition To Resource Division RTOR000604/2023-2024 4931/BWD 10/11/2023 0 Resource Division 33.07 0.00 0 0
2229 PURBA BARDHAMAN Bhatar Central Mechanical NABASTA PIPED WATER SUPPLY SCHEME , SM/14059 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Karjana & others water supply scheme under Bhatar Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000067/2024-2025 2394/CMD 02/08/2024 90 AHALYA ENGINEERING WORKS 82.00 0.00 0 0
2230 PURBA BARDHAMAN Bhatar Central Mechanical NABASTA PIPED WATER SUPPLY SCHEME , SM/14059 New New Service connection at Nabastha PWSS PH-1 BILL/02316/2023-2024 BP-2023-24-456 30/01/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 6.04 0.00 0 0
2231 PURBA BARDHAMAN Bhatar Central Mechanical NABASTA PIPED WATER SUPPLY SCHEME , SM/14059 New New Service connection at Nabastha PWSS PH-2 BILL/02317/2023-2024 BP-2023-24-457 30/01/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.95 0.00 0 0
2232 PURBA BARDHAMAN Bhatar Central Mechanical NABASTA PIPED WATER SUPPLY SCHEME , SM/14059 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at NABASTA Water Supply Scheme [ Block-BHATAR ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000776/2023-2024 4070/CMD 29/08/2023 30 M/S, S.S. ENTERPRISE. 27.79 14.92 53.69 40
2233 PURBA BARDHAMAN Bhatar Burdwan Division NABASTA PIPED WATER SUPPLY SCHEME , SM/14059 New Different works related (sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of different capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site) to NABASTA, PASHALA & POALKURA Piped Water Supply Scheme under Bhatar Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer1, Durgapur Sub-Division, PHE Dte.,Junior Engineer2, Durgapur Sub-Division, PHE Dte. ORD/000739/2023-2024 4652/BWD 31/10/2023 702 STARCO CONSTRUCTIONS 900.17 100.31 11.14 2
2234 PURBA BARDHAMAN Bhatar Burdwan Division NABASTA PIPED WATER SUPPLY SCHEME , SM/14059 New Providing Parallal LDS (Node- 30-43-42-41-49 to 36) & 4nos ICDS connection for at Palsa-Chandrasekharpara within Nabastha PWSS, Bardhhaman-II Development Block under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/001068/2024-2025 358/BWD 16/01/2025 60 PRATIVA CONSTRUCTION 7.61 0.00 0 0
2235 PURBA BARDHAMAN Bhatar Burdwan Division POALKURA PIPED WATER SUPPLY SCHEME , SM/14061 New Material Requisition To Resource Division RTOR000372/2023-2024 2197/BWD 12/05/2023 0 Resource Division 15.26 0.00 0 0
2236 PURBA BARDHAMAN Bhatar Burdwan Division POALKURA PIPED WATER SUPPLY SCHEME , SM/14061 New Material Requisition To Resource Division RTOR000753/2023-2024 5239/BWD 30/11/2023 0 Resource Division 18.50 0.00 0 0
2237 PURBA BARDHAMAN Bhatar Burdwan Division POALKURA PIPED WATER SUPPLY SCHEME , SM/14061 New Material Requisition To Resource Division RTOR000555/2023-2024 4948/BWD 10/11/2023 0 Resource Division 1.30 0.00 0 0
2238 PURBA BARDHAMAN Bhatar Central Mechanical POALKURA PIPED WATER SUPPLY SCHEME , SM/14061 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Karjana & others water supply scheme under Bhatar Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000067/2024-2025 2394/CMD 02/08/2024 90 AHALYA ENGINEERING WORKS 82.00 0.00 0 0
2239 PURBA BARDHAMAN Bhatar Central Mechanical POALKURA PIPED WATER SUPPLY SCHEME , SM/14061 New New service connection for Poalkora PWSS BILL/02560/2023-2024 BP-2023-24-545 19/02/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 0.14 0.00 0 0
2240 PURBA BARDHAMAN Bhatar Central Mechanical POALKURA PIPED WATER SUPPLY SCHEME , SM/14061 New Additional quotation for new service connection for POALKURA PWSS PH1 BILL/01221/2024-2025 BP-2024-25-418 16/12/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 2.50 0.00 0 0
2241 PURBA BARDHAMAN Bhatar Central Mechanical POALKURA PIPED WATER SUPPLY SCHEME , SM/14061 New New service connection for Poalkura PWSS BILL/02842/2023-2024 BP-2023-24-590 04/03/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 6.85 0.00 0 0
2242 PURBA BARDHAMAN Bhatar Central Mechanical POALKURA PIPED WATER SUPPLY SCHEME , SM/14061 New New Service connection at Poalkura PWSS PH-1 BILL/02319/2023-2024 BP-2023-24-455 30/01/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 6.32 0.00 0 0
2243 PURBA BARDHAMAN Bhatar Central Mechanical POALKURA PIPED WATER SUPPLY SCHEME , SM/14061 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at POALKURA Water Supply Scheme [ Block- BHATAR] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000917/2023-2024 4181/CMD 29/08/2023 30 M/S, S.S. ENTERPRISE. 27.65 14.46 52.3 40
2244 PURBA BARDHAMAN Bhatar Burdwan Division POALKURA PIPED WATER SUPPLY SCHEME , SM/14061 New Different works related (sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of different capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site) to NABASTA, PASHALA & POALKURA Piped Water Supply Scheme under Bhatar Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer1, Durgapur Sub-Division, PHE Dte.,Junior Engineer2, Durgapur Sub-Division, PHE Dte. ORD/000739/2023-2024 4652/BWD 31/10/2023 702 STARCO CONSTRUCTIONS 900.17 82.83 9.2 2
2245 PURBA BARDHAMAN Ausgram-I,Ausgram-II,Bhatar,Burdwan-I,Galsi-I,Galsi-II,Kalna-I,Kalna-II,Katwa-I,Katwa-II,Ketugram-I,Ketugram-II,Khandaghosh,Mangolkote,Manteswar,Memari-II,Purbasthali-I,Raina-I,Raina-II Central Mechanical GROUND WATER BASED MINI PIPED WATER SUPPLY SCHEMES AT UNCOVERED VILLAGES IN ALL BLOCKS WITHIN PURBA BARDHAMAN DISTRICT UNDER BURDWAN DIVISION PHE DTE , SM/14132 New Supply & Installation of Submersible Pumping Machinery , Voltage Stabilizer, Chlorination system and internal House wiring for Tube well no.- 6 at Augmentation of Bhatar (Zone - II) (Bhumsor) Water Supply Scheme under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000933/2022-2023 1310/CMD 22/03/2023 30 SUDIPTA GHOSH 12.05 11.62 96.43 95
2246 PURBA BARDHAMAN Ausgram-I,Ausgram-II,Bhatar,Burdwan-I,Galsi-I,Galsi-II,Kalna-I,Kalna-II,Katwa-I,Katwa-II,Ketugram-I,Ketugram-II,Khandaghosh,Mangolkote,Manteswar,Memari-II,Purbasthali-I,Raina-I,Raina-II Central Mechanical GROUND WATER BASED MINI PIPED WATER SUPPLY SCHEMES AT UNCOVERED VILLAGES IN ALL BLOCKS WITHIN PURBA BARDHAMAN DISTRICT UNDER BURDWAN DIVISION PHE DTE , SM/14132 New Quotation for new service connection at Nabagram PWSS TW-3 BILL/00960/2024-2025 BP-2024-25-381 14/11/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 19.77 0.00 0 0
2247 PURBA BARDHAMAN Ausgram-I,Ausgram-II,Bhatar,Burdwan-I,Galsi-I,Galsi-II,Kalna-I,Kalna-II,Katwa-I,Katwa-II,Ketugram-I,Ketugram-II,Khandaghosh,Mangolkote,Manteswar,Memari-II,Purbasthali-I,Raina-I,Raina-II Central Mechanical GROUND WATER BASED MINI PIPED WATER SUPPLY SCHEMES AT UNCOVERED VILLAGES IN ALL BLOCKS WITHIN PURBA BARDHAMAN DISTRICT UNDER BURDWAN DIVISION PHE DTE , SM/14132 New Quotation for new service connection at Jahannagar Augmentation PWSS TW-3 BILL/01036/2024-2025 BP-2024-25-382 14/11/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 7.54 0.00 0 0
2248 PURBA BARDHAMAN Ausgram-I,Ausgram-II,Bhatar,Burdwan-I,Galsi-I,Galsi-II,Kalna-I,Kalna-II,Katwa-I,Katwa-II,Ketugram-I,Ketugram-II,Khandaghosh,Mangolkote,Manteswar,Memari-II,Purbasthali-I,Raina-I,Raina-II Burdwan Division GROUND WATER BASED MINI PIPED WATER SUPPLY SCHEMES AT UNCOVERED VILLAGES IN ALL BLOCKS WITHIN PURBA BARDHAMAN DISTRICT UNDER BURDWAN DIVISION PHE DTE , SM/14132 New Implementation of Ground Water Based Mini Piped Water supply Scheme in 129 Nos. villages in Aushgram I & II, Burdwan I & II, Galsi I & II, Katwa I & II, Ketugream I & II, Raina I & II, Bhatar, Khandaghosh, Mongalkote and Memari II Block maximum 100 households in Purba Bardhaman district under Burdwan Division, PHE. Dte. Assistant Engineer ,Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE.,Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer ORD/000703/2022-2023 641/BWD 20/02/2023 1042 BIRBHUM INFRAPARK PRIVATE LIMITED 4,231.72 1,214.93 28.71 42
2249 PURBA BARDHAMAN Ausgram-I,Ausgram-II,Bhatar,Burdwan-I,Galsi-I,Galsi-II,Kalna-I,Kalna-II,Katwa-I,Katwa-II,Ketugram-I,Ketugram-II,Khandaghosh,Mangolkote,Manteswar,Memari-II,Purbasthali-I,Raina-I,Raina-II Burdwan Division GROUND WATER BASED MINI PIPED WATER SUPPLY SCHEMES AT UNCOVERED VILLAGES IN ALL BLOCKS WITHIN PURBA BARDHAMAN DISTRICT UNDER BURDWAN DIVISION PHE DTE , SM/14132 New Conducting physical Household Survey at the IMIS reported village for HGJ certification and providing balance FHTC for Har Ghar Jal certification including conducting Gram Sabhas for different IMIS reported villages across the district under Burdwan Division, PHE Dte. AE(HQs),Assistant Engineer ,Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE.,Assistant Engineer, Durgapur Sub Division, P.H.E. Dte JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000428/2024-2025 3107/BWD 12/08/2024 323 TUBGRAM GRAMMYAK UNNAYAN SAMITY 309.60 0.00 0 85
2250 PURBA BARDHAMAN Ausgram-I,Ausgram-II,Bhatar,Burdwan-I,Galsi-I,Galsi-II,Kalna-I,Kalna-II,Katwa-I,Katwa-II,Ketugram-I,Ketugram-II,Khandaghosh,Mangolkote,Manteswar,Memari-II,Purbasthali-I,Raina-I,Raina-II Burdwan Division GROUND WATER BASED MINI PIPED WATER SUPPLY SCHEMES AT UNCOVERED VILLAGES IN ALL BLOCKS WITHIN PURBA BARDHAMAN DISTRICT UNDER BURDWAN DIVISION PHE DTE , SM/14132 New Designing, making and erection of Sign Board for SWAJAL GRAM in Jamaipota village of Raina-I Block under Mini Piped Water Supply Scheme (100 Household) within Burdwan Sub-Division under Burdwan Division,PHE Dte(5 nos. Board) JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000477/2025-2026 2341/BSD 21/08/2025 10 S.M. ENGOCON 0.72 0.00 0 0
2251 PURBA BARDHAMAN Purbasthali-I Burdwan Division ARJUNPUKUR PIPED WATER SUPPLY SCHEME , SM/13413 New Material Requisition To Resource Division RTOR000177/2023-2024 2155/BWD 10/05/2023 0 Resource Division 17.10 0.00 0 0
2252 PURBA BARDHAMAN Purbasthali-I Burdwan Division ARJUNPUKUR PIPED WATER SUPPLY SCHEME , SM/13413 New Material Requisition To Resource Division RTOR000476/2023-2024 4000/BWD 08/09/2023 0 Resource Division 1.54 0.00 0 0
2253 PURBA BARDHAMAN Purbasthali-I Central Mechanical ARJUNPUKUR PIPED WATER SUPPLY SCHEME , SM/13413 New New service connection charges for Arjunpukur PWSS Tw-1 BILL/00698/2023-2024 BP-2023-24-50 13/07/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.35 0.00 0 0
2254 PURBA BARDHAMAN Purbasthali-I Central Mechanical ARJUNPUKUR PIPED WATER SUPPLY SCHEME , SM/13413 New New service connection charges for Arjunpukur PWSS Tw-2 BILL/00699/2023-2024 BP-2023-24-51 13/07/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.05 0.00 0 0
2255 PURBA BARDHAMAN Purbasthali-I Central Mechanical ARJUNPUKUR PIPED WATER SUPPLY SCHEME , SM/13413 New Supply & Installation of Submersible Pumping Machinery , Voltage Stabilizer, Chlorination System and Internal House wiring for Tube well no.- 1 & 2 at ARJUNPUKUR Water Supply Scheme [Block-PURBASTHALI-1] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000125/2023-2024 2638/CMD 14/06/2023 444 ANJAN ENTERPRISE 21.51 19.50 90.66 90
2256 PURBA BARDHAMAN Purbasthali-I Burdwan Division ARJUNPUKUR PIPED WATER SUPPLY SCHEME , SM/13413 New Laying of additional pipeline and providing FHTC at ARJUNPUKUR Water Supply Scheme under Kalna Sub-Division, Burdwan Division, PHE Dte. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000175/2024-2025 2252/BWD 18/06/2024 90 IYASIN DAFADAR 16.60 16.60 100 2
2257 PURBA BARDHAMAN Purbasthali-I Burdwan Division ARJUNPUKUR PIPED WATER SUPPLY SCHEME , SM/13413 New Material Requisition To Resource Division RTOR000795/2023-2024 314/BWD 24/01/2024 0 Resource Division 14.63 0.00 0 0
2258 PURBA BARDHAMAN Purbasthali-I Burdwan Division ARJUNPUKUR PIPED WATER SUPPLY SCHEME , SM/13413 New ARJUNPUKUR Piped Water Supply Scheme with sinking of Tube-well, LDS,Rising Main, FHTC, Construction of 200 cum capacity RCC OHR with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drain and internal pathway at different TW site under Purbasthali-I Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000003/2023-2024 1617/BWD 05/04/2023 365 AZAD ENTERPRISE 397.64 355.70 89.45 85
2259 PURBA BARDHAMAN Purbasthali-I Central Mechanical ARJUNPUKUR PIPED WATER SUPPLY SCHEME , SM/13413 New Supply and installation of Electro-Magnetic flow meter at Bazar Mahammadpur, Dhatrigram, Arjunpukur & others water supply scheme under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000590/2024-2025 3105/CMD 11/12/2024 60 SHREE BISHNU CONSTRUCTION 19.77 0.00 0 0
2260 PURBA BARDHAMAN Purbasthali-I Burdwan Division ARJUNPUKUR PIPED WATER SUPPLY SCHEME , SM/13413 New Pipeline laying by HDD method and different types of balance works in connection with different Augmentation & New Scheme [(SM/ 08103), (SM/13413), (SM/15587), (SM/16035), (SM/16287), (SM/16029), (SM/15581), (SM/14437), (SM/16028), (SM/16036) & (SM/14425)] within Kalna Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer ORD/001270/2024-2025 849/BWD 05/03/2025 180 S.P. CONSTRUCTION 683.30 0.00 0 0
2261 PURBA BARDHAMAN Purbasthali-I Central Mechanical ARJUNPUKUR PIPED WATER SUPPLY SCHEME , SM/13413 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Manganpur & others water supply scheme under Purbasthali 1 Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000714/2024-2025 2979/CMD 25/11/2024 90 H.K. DAS & CO. 53.27 0.00 0 0
2262 PURBA BARDHAMAN Khandaghosh Central Mechanical TELUN PIPED WATER SUPPLY SCHEME , SM/13455 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at Telun Water Supply Scheme [ Block- Khandogosh ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER Junior Engineer ORD/000907/2023-2024 4171/CMD 29/08/2023 30 P.K. ENGINEERING 29.82 0.00 0 0
2263 PURBA BARDHAMAN Khandaghosh Burdwan Division TELUN PIPED WATER SUPPLY SCHEME , SM/13455 New Material Requisition To Resource Division RTOR000061/2023-2024 1962/BWD 25/04/2023 0 Resource Division 7.19 0.00 0 0
2264 PURBA BARDHAMAN Khandaghosh Burdwan Division TELUN PIPED WATER SUPPLY SCHEME , SM/13455 New Material Requisition To Resource Division RTOR000168/2023-2024 2155/BWD 10/05/2023 0 Resource Division 13.11 0.00 0 0
2265 PURBA BARDHAMAN Khandaghosh Burdwan Division TELUN PIPED WATER SUPPLY SCHEME , SM/13455 New Material Requisition To Resource Division RTOR000735/2023-2024 5258/BWD 30/11/2023 0 Resource Division 21.07 0.00 0 0
2266 PURBA BARDHAMAN Khandaghosh Central Mechanical TELUN PIPED WATER SUPPLY SCHEME , SM/13455 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at BICHKHARA & others water supply scheme under Khandoghosh Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman ASSISTANT ENGINEER Junior Engineer ORD/000064/2024-2025 2390/CMD 02/08/2024 90 MS DAS ELECTRIC CO 46.54 0.00 0 0
2267 PURBA BARDHAMAN Khandaghosh Central Mechanical TELUN PIPED WATER SUPPLY SCHEME , SM/13455 New New service connection charges for Telun PWSS TW-1 BILL/02208/2023-2024 BP-2023-24-392 17/01/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 4.90 0.00 0 0
2268 PURBA BARDHAMAN Khandaghosh Central Mechanical TELUN PIPED WATER SUPPLY SCHEME , SM/13455 New Quotation for new service connection at TELUN W/S Scheme PH-II. BILL/01811/2023-2024 BP-2023-24-302 30/12/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 7.25 0.00 0 0
2269 PURBA BARDHAMAN Khandaghosh Burdwan Division TELUN PIPED WATER SUPPLY SCHEME , SM/13455 New TELUN Piped Water Supply Scheme with sinking of Tube-well, LDS, Rising Main, FHTC, Construction of 300 cum capacity RCC OHR with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drain and internal pathway at different TW site under KHANDAGHOSH Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer1, Durgapur Sub-Division, PHE Dte.,Junior Engineer2, Durgapur Sub-Division, PHE Dte. ORD/000803/2022-2023 1535/BWD 29/03/2023 952 G.B. CONSTRUCTION & CO. 449.21 96.91 21.57 30
2270 PURBA BARDHAMAN Khandaghosh Burdwan Division TELUN PIPED WATER SUPPLY SCHEME , SM/13455 New Balance work for providing Functional Household Tap Connection (FHTC) within the command area BICHKHARA & TELUN W/S. Scheme of Khandaghosh Block under Burdwan Division, PHE. Dte. Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer1, Durgapur Sub-Division, PHE Dte. ORD/001096/2024-2025 434/BWD 20/01/2025 182 KOUSIK MALLICK 108.55 0.00 0 50
2271 PURBA BARDHAMAN Khandaghosh Burdwan Division TELUN PIPED WATER SUPPLY SCHEME , SM/13455 New Land demarcation and preparation of sketch map including legal charges for different PWSS under JJM of Khandaghosh Block under Duragapur (Burdwan North) Sub-Division, P.H.E. DTE. [Part-A] ORD/001510/2024-2025 158/DSD 27/01/2025 180 SHUBHRA KANTI GHOSH 0.81 0.00 0 90
2272 PURBA BARDHAMAN Khandaghosh Burdwan Division TELUN PIPED WATER SUPPLY SCHEME , SM/13455 New Mutation of Departmental Land use in various PWSS (Existing & New) under JJM of Bhatar, Khandaghosh and Manteswar Block under Duragapur (Burdwan North) Sub-Division, P.H.E. DTE. Junior Engineer1, Durgapur Sub-Division, PHE Dte. ORD/000237/2025-2026 661/DSD 30/04/2025 365 SHUBHRA KANTI GHOSH 0.47 0.00 0 70
2273 PURBA BARDHAMAN Khandaghosh Burdwan Division BALABATI PIPED WATER SUPPLY SCHEME , SM/13457 New Material Requisition To Resource Division RTOR000076/2023-2024 1962/BWD 25/04/2023 0 Resource Division 2.20 0.00 0 0
2274 PURBA BARDHAMAN Khandaghosh Burdwan Division BALABATI PIPED WATER SUPPLY SCHEME , SM/13457 New Material Requisition To Resource Division RTOR000167/2023-2024 2155/BWD 10/05/2023 0 Resource Division 9.06 0.00 0 0
2275 PURBA BARDHAMAN Khandaghosh Burdwan Division BALABATI PIPED WATER SUPPLY SCHEME , SM/13457 New Material Requisition To Resource Division RTOR000709/2023-2024 5048/BWD 23/11/2023 0 Resource Division 20.46 0.00 0 0
2276 PURBA BARDHAMAN Khandaghosh Central Mechanical BALABATI PIPED WATER SUPPLY SCHEME , SM/13457 New New service connection charges for Balabati PWSS TW-1 BILL/01777/2023-2024 BP-2023-24-283 26/12/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 2.89 0.00 0 0
2277 PURBA BARDHAMAN Khandaghosh Central Mechanical BALABATI PIPED WATER SUPPLY SCHEME , SM/13457 New Electric quotation for New Service Connection at Balabati W/S Scehem PH-2. BILL/01773/2023-2024 BP-2023-24-284 26/12/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 4.71 0.00 0 0
2278 PURBA BARDHAMAN Khandaghosh Burdwan Division BALABATI PIPED WATER SUPPLY SCHEME , SM/13457 New Different works related (sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of different capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site) to AMRA, BALABATI, UKHRID & RUPSA Piped Water Supply Scheme under KHANDAGHOSH Block, District:- Purba Bardhaman [NEW SCHEME] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer1, Durgapur Sub-Division, PHE Dte.,Junior Engineer2, Durgapur Sub-Division, PHE Dte. ORD/000008/2023-2024 1726/BWD 13/04/2023 902 S.P. CONSTRUCTION 1,710.27 271.50 15.87 45
2279 PURBA BARDHAMAN Khandaghosh Central Mechanical BALABATI PIPED WATER SUPPLY SCHEME , SM/13457 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at KHEJURHATI & others water supply scheme under Khandoghosh Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman ASSISTANT ENGINEER Junior Engineer ORD/000071/2024-2025 2391/CMD 02/08/2024 90 C.M. ENTERPRISE 45.81 0.00 0 10
2280 PURBA BARDHAMAN Khandaghosh Burdwan Division BALABATI PIPED WATER SUPPLY SCHEME , SM/13457 New Balance work for providing Functional Household Tap Connection (FHTC) within the command area BALABATI, AMRA & RUPSA W/S. Scheme of Khandaghosh Block under Burdwan Division, PHE. Dte. Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer1, Durgapur Sub-Division, PHE Dte. ORD/001189/2024-2025 609/BWD 11/02/2025 120 M/S S.S. ENTERPRISE 194.58 0.00 0 0
2281 PURBA BARDHAMAN Katwa-I Burdwan Division MERA PIPE WATER SUPPLY SCHEME , SM/15575 New Material Requisition To Resource Division RTOR000109/2022-2023 1642/BWD 06/04/2023 0 Resource Division 1.83 0.00 0 0
2282 PURBA BARDHAMAN Katwa-I Burdwan Division MERA PIPE WATER SUPPLY SCHEME , SM/15575 New Material Requisition To Resource Division RTOR000066/2022-2023 1261/BWD 17/03/2023 0 Resource Division 7.73 0.00 0 0
2283 PURBA BARDHAMAN Katwa-I Burdwan Division MERA PIPE WATER SUPPLY SCHEME , SM/15575 New Material Requisition To Resource Division RTOR000621/2023-2024 4879/BWD 10/11/2023 0 Resource Division 31.56 0.00 0 0
2284 PURBA BARDHAMAN Katwa-I Burdwan Division MERA PIPE WATER SUPPLY SCHEME , SM/15575 New MERA Piped Water Supply Scheme with sinking of Tube-well, LDS, Rising Main, FHTC, Construction of 200 cum capacity RCC OHR with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drain and internal pathway at different TW site under KATWA -I Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer Junior Engineer, R.W.S., Katwa-I Dev. Block ORD/000752/2022-2023 1209/BWD 15/03/2023 365 NABIN DEBNATH 303.82 101.73 33.48 55
2285 PURBA BARDHAMAN Katwa-I Burdwan Division MERA PIPE WATER SUPPLY SCHEME , SM/15575 New Continuation work for Supply of one no. Diesel / LPG / CNG driven Motor Cab / Maxi Cab (Air Condition) on hire basis for the office of the Executive Engineer, Burdwan Division, P.H.E. Dte. [Period from 01.06.2024 to 31.07.2024] AE(HQs) J.E. 1 BURDWAN ORD/000442/2024-2025 306/AE/HQ 31/05/2024 61 MD HASIN 0.80 0.77 96.25 0
2286 PURBA BARDHAMAN Katwa-I Burdwan Division MERA PIPE WATER SUPPLY SCHEME , SM/15575 New Continuation work for Supply of one no. Diesel / LPG / CNG driven Motor Cab / Maxi Cab (Air Condition) on hire basis for the office of the Executive Engineer, Burdwan Division, P.H.E. Dte. [Period from 01.10.2024 to 30.11.2024] AE(HQs) Contractual Junior Engineer ORD/000707/2024-2025 802/AE/HQ 30/09/2024 61 MD HASIN 0.80 0.63 78.75 0
2287 PURBA BARDHAMAN Katwa-I Central Mechanical MERA PIPE WATER SUPPLY SCHEME , SM/15575 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Jajigram & others water supply scheme under Katwa-I Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman Driller In-Charge Junior Engineer ORD/000069/2024-2025 2399/CMD 02/08/2024 90 SUBRATA BHADRA 55.16 0.00 0 0
2288 PURBA BARDHAMAN Katwa-I Burdwan Division MERA PIPE WATER SUPPLY SCHEME , SM/15575 New Continuation work for Supply of one no. Diesel / LPG / CNG driven Motor Cab / Maxi Cab (Air Condition) on hire basis for the office of the Executive Engineer, Burdwan Division, P.H.E. Dte. [Period from 01.08.2024 to 30.09.2024] AE(HQs) Contractual Junior Engineer ORD/000507/2024-2025 547/AE/HQ 01/08/2024 61 MD HASIN 0.80 0.74 92.5 0
2289 PURBA BARDHAMAN Katwa-I Burdwan Division MERA PIPE WATER SUPPLY SCHEME , SM/15575 New Supply of one no. Diesel / LPG / CNG driven Motor Cab / Maxi Cab (Air Condition) on hire basis for the office of the Executive Engineer, Burdwan Division, P.H.E. Dte. [Period from 01.02.2024 to 31.03.2024] AE(HQs) J.E. 1 BURDWAN ORD/001205/2023-2024 43/AE/HQ 29/01/2024 60 MD HASIN 0.80 0.76 95 0
2290 PURBA BARDHAMAN Katwa-I Burdwan Division MERA PIPE WATER SUPPLY SCHEME , SM/15575 New Different work for MERA PWSS (Mustafapur, Arangabad and Mera mouza) plinth protection for pump house & OHR under MERA PWSS, at Katwa -I Block under Katwa Sub-Division under Burdwan Division PHE Dte. Assistant Engineer ORD/000964/2024-2025 4374/BWD 13/12/2024 90 J.K. CORPORATION 51.30 0.00 0 0
2291 PURBA BARDHAMAN Katwa-I Burdwan Division MERA PIPE WATER SUPPLY SCHEME , SM/15575 New Continuation work for Supply of one no. Diesel / LPG / CNG driven Motor Cab / Maxi Cab (Air Condition) on hire basis for the office of the Executive Engineer, Burdwan Division, P.H.E. Dte. [Period from 01.04.2024 to 31.05.2024] AE(HQs) J.E. 1 BURDWAN ORD/001231/2023-2024 236/AE/HQ 28/03/2024 61 MD HASIN 0.80 0.76 95 0
2292 PURBA BARDHAMAN Katwa-I Central Mechanical MERA PIPE WATER SUPPLY SCHEME , SM/15575 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at MERA Water Supply Scheme [ Block- KATWA-I ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. Driller In-Charge Junior Engineer ORD/000886/2023-2024 4149/CMD 29/08/2023 30 GOENKA ENTERPRISE 26.98 21.20 78.58 91
2293 PURBA BARDHAMAN Katwa-I Central Mechanical MERA PIPE WATER SUPPLY SCHEME , SM/15575 New New service connection for MERA PWSS TW 2. BILL/02446/2023-2024 BP-2023-24-525 09/02/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 5.08 0.00 0 0
2294 PURBA BARDHAMAN Katwa-I Central Mechanical MERA PIPE WATER SUPPLY SCHEME , SM/15575 New New Service connection for Mera PWSS TW-1 BILL/02351/2023-2024 BP-2023-24-462 30/01/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 2.98 0.00 0 0
2295 PURBA BARDHAMAN Katwa-I Burdwan Division MERA PIPE WATER SUPPLY SCHEME , SM/15575 New Continuation work for Supply of one no. Diesel / LPG / CNG driven Motor Cab / Maxi Cab (Air Condition) on hire basis for the office of the Executive Engineer, Burdwan Division, P.H.E. Dte. [Period from 01.12.2024 to 31.01.2025] AE(HQs) Contractual Junior Engineer ORD/000897/2024-2025 1010/AE/HQ 29/11/2024 61 MD HASIN 0.80 0.72 90 0
2296 PURBA BARDHAMAN Katwa-I Burdwan Division MERA PIPE WATER SUPPLY SCHEME , SM/15575 New Continuation work for Supply of one no. Diesel / LPG / CNG driven Motor Cab / Maxi Cab (Air Condition) on hire basis for the office of the Executive Engineer, Burdwan Division, P.H.E. Dte. [Period from 01.06.2025 to 31.07.2025] AE(HQs), Burdwan Division, PHE Dte. Contractual Junior Engineer ORD/000169/2025-2026 690/AE/HQ 30/05/2025 61 MD HASIN 0.80 0.00 0 0
2297 PURBA BARDHAMAN Katwa-I Burdwan Division MERA PIPE WATER SUPPLY SCHEME , SM/15575 New Continuation work for Supply of one no. Diesel / LPG / CNG driven Motor Cab / Maxi Cab (Air Condition) on hire basis for the office of the Executive Engineer, Burdwan Division, P.H.E. Dte. [Period from 01.04.2025 to 31.05.2025] AE(HQs), Burdwan Division, PHE Dte. Contractual Junior Engineer ORD/001405/2024-2025 457/AE/HQ 28/03/2025 61 MD HASIN 0.80 0.00 0 0
2298 PURBA BARDHAMAN Katwa-I Burdwan Division MERA PIPE WATER SUPPLY SCHEME , SM/15575 New Continuation work for Supply of one no. Diesel / LPG / CNG driven Motor Cab / Maxi Cab (Air Condition) on hire basis for the office of the Executive Engineer, Burdwan Division, P.H.E. Dte. [Period from 01.02.2025 to 31.03.2025] AE(HQs) Contractual Junior Engineer ORD/001154/2024-2025 186/AE/HQ 31/01/2025 59 MD HASIN 0.80 0.62 77.5 0
2299 PURBA BARDHAMAN Katwa-I Burdwan Division MERA PIPE WATER SUPPLY SCHEME , SM/15575 New Continuation work for Supply of one no. Diesel / LPG / CNG driven Motor Cab / Maxi Cab (Air Condition) on hire basis for the office of the Executive Engineer, Burdwan Division, P.H.E. Dte. [Period from 01.12.2025 to 31.01.2026] Contractual Junior Engineer ORD/000801/2025-2026 1281/AE/HQ 01/12/2025 62 MD HASIN 0.80 0.00 0 0
2300 PURBA BARDHAMAN Katwa-I Burdwan Division MERA PIPE WATER SUPPLY SCHEME , SM/15575 New Continuation work for Supply of one no. Diesel / LPG / CNG driven Motor Cab / Maxi Cab (Air Condition) on hire basis for the office of the Executive Engineer, Burdwan Division, P.H.E. Dte. [Period from 01.08.2025 to 30.09.2025] AE(HQs), Burdwan Division, PHE Dte. Contractual Junior Engineer ORD/000528/2025-2026 1035/AE/HQ 01/08/2025 61 MD HASIN 0.80 0.00 0 0
2301 PURBA BARDHAMAN Katwa-I Burdwan Division MERA PIPE WATER SUPPLY SCHEME , SM/15575 New Continuation work for Supply of one no. Diesel / LPG / CNG driven Motor Cab / Maxi Cab (Air Condition) on hire basis for the office of the Executive Engineer, Burdwan Division, P.H.E. Dte. [Period from 01.10.2025 to 30.11.2025] AE(HQs), Burdwan Division, PHE Dte. Contractual Junior Engineer ORD/000701/2025-2026 1195/AE/HQ 24/09/2025 61 MD HASIN 0.80 0.00 0 0
2302 PURBA BARDHAMAN Bhatar Burdwan Division DHENRIA PIPED WATER SUPPLY SCHEME , SM/15246 New Material Requisition To Resource Division RTOR000171/2023-2024 2155/BWD 10/05/2023 0 Resource Division 8.61 0.00 0 0
2303 PURBA BARDHAMAN Bhatar Burdwan Division DHENRIA PIPED WATER SUPPLY SCHEME , SM/15246 New Material Requisition To Resource Division RTOR000586/2023-2024 4930/BWD 10/11/2023 0 Resource Division 34.57 0.00 0 0
2304 PURBA BARDHAMAN Bhatar Burdwan Division DHENRIA PIPED WATER SUPPLY SCHEME , SM/15246 New Material Requisition To Resource Division RTOR000067/2023-2024 1962/BWD 25/04/2023 0 Resource Division 31.52 0.00 0 0
2305 PURBA BARDHAMAN Bhatar Central Mechanical DHENRIA PIPED WATER SUPPLY SCHEME , SM/15246 New New service connection charges for Dhenria PWSS TW-1 BILL/01418/2023-2024 BP-2023-24-147 31/08/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 5.27 0.00 0 0
2306 PURBA BARDHAMAN Bhatar Central Mechanical DHENRIA PIPED WATER SUPPLY SCHEME , SM/15246 New New service connection charges for Dhenria PWSS TW-2 BILL/01473/2023-2024 BP-2023-24-167 27/09/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.71 0.00 0 0
2307 PURBA BARDHAMAN Bhatar Central Mechanical DHENRIA PIPED WATER SUPPLY SCHEME , SM/15246 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at DHENRIA Water Supply Scheme [ Block-BHATAR ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000559/2023-2024 3872/CMD 17/08/2023 30 M/S, S.S. ENTERPRISE. 27.79 21.41 77.04 90
2308 PURBA BARDHAMAN Bhatar Central Mechanical DHENRIA PIPED WATER SUPPLY SCHEME , SM/15246 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Karjana & others water supply scheme under Bhatar Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000067/2024-2025 2394/CMD 02/08/2024 90 AHALYA ENGINEERING WORKS 82.00 0.00 0 0
2309 PURBA BARDHAMAN Bhatar Burdwan Division DHENRIA PIPED WATER SUPPLY SCHEME , SM/15246 New Material Requisition To Resource Division RTOR000782/2023-2024 325/BWD 24/01/2024 0 Resource Division 6.44 0.00 0 0
2310 PURBA BARDHAMAN Bhatar Burdwan Division DHENRIA PIPED WATER SUPPLY SCHEME , SM/15246 New Different works related (sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of different capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site) to DHENRIA, MAHATA, DEBPUR Piped Water Supply Scheme under BHATAR Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer ,Junior Engineer2, Durgapur Sub-Division, PHE Dte. ORD/000019/2023-2024 1737/BWD 13/04/2023 993 M/S B. RAI CONSTRUCTION COMPANY 1,643.39 251.96 15.33 81
2311 PURBA BARDHAMAN Bhatar Burdwan Division DHENRIA PIPED WATER SUPPLY SCHEME , SM/15246 New Continuation for the work of Supply of Inspection Vehicle for inspection of different JJM related (Schemes) works as and when required including supply of driver & fuel (minimum 8 Hours duty per day) and all taxes etc. for Durgapur Sub-Division under Burdwan Division, P.H.E. Dte.consider 96.00 Km. run per day. [PeriodFebruary.'2025 to April'2025] ORD/001180/2024-2025 129/DSD 29/01/2025 78 MD HASIN 1.00 0.00 0 0
2312 PURBA BARDHAMAN Bhatar Burdwan Division DHENRIA PIPED WATER SUPPLY SCHEME , SM/15246 New Continuation for the work of Supply of Inspection Vehicle for inspection of different JJM related (Schemes) works as and when required including supply of driver & fuel (minimum 8 Hours duty per day) and all taxes etc. for Durgapur Sub-Division under BurdwanDivision, P.H.E. Dte.consider 96.00 Km. run per day [Period NOV.'2024 to JAN.'2025] ORD/000847/2024-2025 886/DSD 21/10/2024 78 MD HASIN 1.00 0.33 33 0
2313 PURBA BARDHAMAN Purbasthali-I Burdwan Division SAHAPUR PIPED WATER SUPPLY SCHEME , SM/14969 New Material Requisition To Resource Division RTOR000279/2023-2024 2197/BWD 12/05/2023 0 Resource Division 18.45 0.00 0 0
2314 PURBA BARDHAMAN Purbasthali-I Burdwan Division SAHAPUR PIPED WATER SUPPLY SCHEME , SM/14969 New Material Requisition To Resource Division RTOR000510/2023-2024 4034/BWD 08/09/2023 0 Resource Division 3.06 0.00 0 0
2315 PURBA BARDHAMAN Purbasthali-I Burdwan Division SAHAPUR PIPED WATER SUPPLY SCHEME , SM/14969 New Material Requisition To Resource Division RTOR000808/2023-2024 299/BWD 24/01/2024 0 Resource Division 14.63 0.00 0 0
2316 PURBA BARDHAMAN Purbasthali-I Central Mechanical SAHAPUR PIPED WATER SUPPLY SCHEME , SM/14969 New Additional Quotation for new service connection for Sahapur PWSS, PH-1. BILL/00311/2024-2025 BP-2024-25-152 21/06/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 1.86 0.00 0 0
2317 PURBA BARDHAMAN Purbasthali-I Central Mechanical SAHAPUR PIPED WATER SUPPLY SCHEME , SM/14969 New New service connection charges for Sahapur PWSS TW-2 BILL/01831/2023-2024 BP-2023-24-337 06/01/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 12.21 0.00 0 0
2318 PURBA BARDHAMAN Purbasthali-I Central Mechanical SAHAPUR PIPED WATER SUPPLY SCHEME , SM/14969 New New service connection for Sahapur PWSS. BILL/02249/2023-2024 BP-2023-24-389 17/01/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 4.86 0.00 0 0
2319 PURBA BARDHAMAN Purbasthali-I Central Mechanical SAHAPUR PIPED WATER SUPPLY SCHEME , SM/14969 New Supply & Installation of Submersible Pumping Machinery , Voltage Stabilizer, Chlorination system and internal House wiring for Tube well no.- 1 & 2 at SAHAPUR Water Supply Scheme [Block - PURBASTHALI-1] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER Junior Engineer ORD/000036/2023-2024 2473/CMD 30/05/2023 30 MAA KALI ENTERPRISE 20.80 18.94 91.06 90
2320 PURBA BARDHAMAN Purbasthali-I Burdwan Division SAHAPUR PIPED WATER SUPPLY SCHEME , SM/14969 New Different works related (sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of different capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site) to NAMA BHANDARITURI, SAHAPUR & MOUDANGA Piped Water Supply Scheme under PURBASTHALI-I Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000511/2023-2024 3689/BWD 23/08/2023 770 THE MAHADEV CONSTRUCTION 734.18 147.39 20.08 50
2321 PURBA BARDHAMAN Purbasthali-I Central Mechanical SAHAPUR PIPED WATER SUPPLY SCHEME , SM/14969 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Haripur & others water supply scheme under purbasthali 1 Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000072/2024-2025 2397/CMD 02/08/2024 90 CHATTERJEE ENTERPRISE 48.60 0.00 0 30
2322 PURBA BARDHAMAN Ketugram-II Burdwan Division SHIBLUN PIPE WATER SUPPLY SCHEME , SM/14972 New Material Requisition To Resource Division RTOR000065/2023-2024 1962/BWD 25/04/2023 0 Resource Division 1.10 0.00 0 0
2323 PURBA BARDHAMAN Ketugram-II Burdwan Division SHIBLUN PIPE WATER SUPPLY SCHEME , SM/14972 New Material Requisition To Resource Division RTOR000163/2023-2024 2155/BWD 10/05/2023 0 Resource Division 75.98 0.00 0 0
2324 PURBA BARDHAMAN Ketugram-II Burdwan Division SHIBLUN PIPE WATER SUPPLY SCHEME , SM/14972 New Material Requisition To Resource Division RTOR000759/2023-2024 5246/BWD 30/11/2023 0 Resource Division 18.90 0.00 0 0
2325 PURBA BARDHAMAN Ketugram-II Burdwan Division SHIBLUN PIPE WATER SUPPLY SCHEME , SM/14972 New Material Requisition To Resource Division RTOR000487/2023-2024 4011/BWD 08/09/2023 0 Resource Division 1.10 0.00 0 0
2326 PURBA BARDHAMAN Ketugram-II Central Mechanical SHIBLUN PIPE WATER SUPPLY SCHEME , SM/14972 New New service connection charges for Shiblun PWSS TW-2 BILL/01355/2023-2024 BP-2023-24-133 22/08/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 4.04 0.00 0 0
2327 PURBA BARDHAMAN Ketugram-II Central Mechanical SHIBLUN PIPE WATER SUPPLY SCHEME , SM/14972 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at Shiblun Water Supply Scheme [ Block- Ketugram-2 ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. Driller In-Charge Junior Engineer ORD/000490/2023-2024 3798/CMD 10/08/2023 30 S.P. CONSTRUCTION 26.96 16.04 59.5 48
2328 PURBA BARDHAMAN Ketugram-II Central Mechanical SHIBLUN PIPE WATER SUPPLY SCHEME , SM/14972 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Kankurhati & others water supply scheme under Ketugram-2 Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. Driller In-Charge Junior Engineer ORD/000103/2024-2025 2408/CMD 02/08/2024 90 DIPALI CONSTRUCTION 41.95 0.00 0 0
2329 PURBA BARDHAMAN Ketugram-II Central Mechanical SHIBLUN PIPE WATER SUPPLY SCHEME , SM/14972 New REVISED QUOTATION FOR NEW SERVICE CONNECTION AT SHIBLUN PWSS TW-1 BILL/00369/2024-2025 BP-2024-25-190 08/07/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 7.19 0.00 0 0
2330 PURBA BARDHAMAN Ketugram-II Central Mechanical SHIBLUN PIPE WATER SUPPLY SCHEME , SM/14972 New New service connection charges for Shiblun PWSS TW-1 BILL/01898/2023-2024 BP-2023-24-368 15/01/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 7.19 0.00 0 0
2331 PURBA BARDHAMAN Ketugram-II Burdwan Division SHIBLUN PIPE WATER SUPPLY SCHEME , SM/14972 New Different works related (sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of different capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site) to CHARKHI & SHIBNUL Piped Water Supply Scheme under KETUGRAM-II Block, District:- Purba Bardhaman [NEW SCHEME] Assistant Engineer JUNIOR ENGINEER KATWA SUB-DIVISION PHE DTE,JUNIOR ENGINEER R.W.S. BURDWAN SUB-DIVISION PHE DTE ORD/000049/2023-2024 1823/BWD 18/04/2023 928 PASCON 723.75 174.88 24.16 35
2332 PURBA BARDHAMAN Ketugram-II Burdwan Division SHIBLUN PIPE WATER SUPPLY SCHEME , SM/14972 New Balance work for OHR, extension of pipeline to provide FHTC with land development, plinth protection for pump house & OHR under SIBLUN PWSS, Block-Ketugram-II under Katwa Sub Division within Burdwan Division PHE Dte. Assistant Engineer JUNIOR ENGINEER KATWA SUB-DIVISION PHE DTE ORD/000311/2024-2025 2835/BWD 19/07/2024 286 PASCON 84.02 0.00 0 80
2333 PURBA BARDHAMAN Jamalpur Burdwan Division GOPALPUR PIPED WATER SUPPLY SCHEME , SM/15583 New Material Requisition To Resource Division RTOR000268/2023-2024 2197/BWD 12/05/2023 0 Resource Division 17.02 0.00 0 0
2334 PURBA BARDHAMAN Jamalpur Burdwan Division GOPALPUR PIPED WATER SUPPLY SCHEME , SM/15583 New Route Survey & Preparation of DPR for GOPALPUR W/S Scheme under Burdwan-I Block under Burdwan Sub- Division under Burdwan Division PHE Dte. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000846/2024-2025 2584/BSD 26/11/2024 45 APEX ENGINEERING 2.71 0.00 0 0
2335 PURBA BARDHAMAN Jamalpur Central Mechanical GOPALPUR PIPED WATER SUPPLY SCHEME , SM/15583 New New Service connection at GOPALPUR PWSS TW-2. BILL/02363/2023-2024 BP-2023-24-483 31/01/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 13.65 0.00 0 0
2336 PURBA BARDHAMAN Jamalpur Central Mechanical GOPALPUR PIPED WATER SUPPLY SCHEME , SM/15583 New New service connection for Gopalpur PWSS TW-1. BILL/02282/2023-2024 BP-2023-24-433 29/01/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 4.00 0.00 0 0
2337 PURBA BARDHAMAN Jamalpur Central Mechanical GOPALPUR PIPED WATER SUPPLY SCHEME , SM/15583 New Supply & Installation of Submersible Pumping Machinery , Voltage Stabilizer, Chlorination System and Internal House wiring for Tube well no.- 1 & 2 at GOPALPUR Water Supply Scheme [Block-JAMALPUR] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000904/2023-2024 4168/CMD 29/08/2023 546 SOUNAK ENTERPRISE 22.10 0.00 0 100
2338 PURBA BARDHAMAN Kalna-II Burdwan Division CHAK SHIMLA PIPE WATER SUPPLY SCHEME. , SM/15586 New Material Requisition To Resource Division RTOR000072/2023-2024 1962/BWD 25/04/2023 0 Resource Division 8.53 0.00 0 0
2339 PURBA BARDHAMAN Kalna-II Burdwan Division CHAK SHIMLA PIPE WATER SUPPLY SCHEME. , SM/15586 New Material Requisition To Resource Division RTOR000287/2023-2024 2197/BWD 12/05/2023 0 Resource Division 9.27 0.00 0 0
2340 PURBA BARDHAMAN Kalna-II Burdwan Division CHAK SHIMLA PIPE WATER SUPPLY SCHEME. , SM/15586 New Work Order for "CONSTRUCTION OF TEMPORARY KIOSK FOR THE NECESSARY ARRANGEMENT OF ELECTRIFICATION OF TUBEWELL FOR CHAKSIMLA PWSS UNDER KALNA SUB-DIVISION UNDER BURDWAN DIVISION, PHE DTE." Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/001151/2023-2024 2020/KSD 06/03/2024 10 ER CONSTRUCTION & GENERAL ORDER SUPPLIER 0.66 0.66 100 2
2341 PURBA BARDHAMAN Kalna-II Burdwan Division CHAK SHIMLA PIPE WATER SUPPLY SCHEME. , SM/15586 New Material Requisition To Resource Division RTOR000793/2023-2024 318/BWD 24/01/2024 0 Resource Division 30.81 0.00 0 0
2342 PURBA BARDHAMAN Kalna-II Central Mechanical CHAK SHIMLA PIPE WATER SUPPLY SCHEME. , SM/15586 New New service connection at Chak Shimla PWSS Ph-1 BILL/02323/2023-2024 BP-2023-24-449 30/01/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 10.74 0.00 0 0
2343 PURBA BARDHAMAN Kalna-II Central Mechanical CHAK SHIMLA PIPE WATER SUPPLY SCHEME. , SM/15586 New New service connection at Chak Shimla PWSS Ph-2 BILL/02324/2023-2024 BP-2023-24-450 30/01/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 13.35 0.00 0 0
2344 PURBA BARDHAMAN Kalna-II Burdwan Division CHAK SHIMLA PIPE WATER SUPPLY SCHEME. , SM/15586 New Different works related (sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of different capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site) to BALINDAR, CHAK SHIMLA & DWARIATAN Piped Water Supply Scheme under Kalna II Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000539/2023-2024 3700/BWD 24/08/2023 770 SUPRITI ENTERPRISE 1,424.22 65.09 4.57 30
2345 PURBA BARDHAMAN Kalna-II Central Mechanical CHAK SHIMLA PIPE WATER SUPPLY SCHEME. , SM/15586 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at CHAK SIMLA Water Supply Scheme [ Block-KALNA-2 ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. [2nd CALL] ASSISTANT ENGINEER Junior Engineer ORD/000931/2023-2024 4194/CMD 29/08/2023 735 J.S. CONSTRUCTION. 28.48 0.00 0 40
2346 PURBA BARDHAMAN Kalna-II Burdwan Division CHAK SHIMLA PIPE WATER SUPPLY SCHEME. , SM/15586 New Different types of works involve in connection with Augmentation of TEHATA Zone-I & II (SM/16301) Water Supply Scheme, CHAKSIMLA (SM/15586) Water Supply Scheme & DWARIATON (SM/16285) Water Supply Scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer JUNIOR ENGINEER RWS KALNA2 ORD/000162/2024-2025 2201/BWD 13/06/2024 752 M/S ASHA CONSTRUCTION 449.98 196.66 43.7 25
2347 PURBA BARDHAMAN Kalna-II Central Mechanical CHAK SHIMLA PIPE WATER SUPPLY SCHEME. , SM/15586 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Khargakur & others water supply scheme under Kalna-2 Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000116/2024-2025 2393/CMD 02/08/2024 280 HANNAN BUILDERS PVT LTD 76.80 0.00 0 20
2348 PURBA BARDHAMAN Burdwan Division RETROFITTING OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR MUGURA , SM/16488 Retrofitting Extension Pipeline with Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of MUGURA Piped Water Supply Scheme within Raina I Block of Burdwan Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000792/2022-2023 1429/BWD 24/03/2023 30 J K CORPORATION 18.57 18.56 99.95 100
2349 PURBA BARDHAMAN Burdwan Division RETROFITTING OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR MUGURA , SM/16488 Retrofitting Preparation and Submission of DPR for Retrofitting of Mugura PWSS under Raina-I Development Block under Burdwan Division, P.H.E Dte(2nd Call) Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000913/2023-2024 2831/BSD 07/12/2023 15 MEASURE LAND 0.78 0.78 100 100
2350 PURBA BARDHAMAN Burdwan Division RETROFITTING OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR MUGURA , SM/16488 Retrofitting Laying Parallel Pipeline to improve drinking water supply, Construction of Boundary wall, Path Way, Drain at Head Work Site & 2nd TW Site and providing leftout FHTC, Road Restoration with allied work for MUGRA Piped Water Supply Scheme, Block- Raina-I, within Burdwan Sub Division under Burdwan Division PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000279/2024-2025 2711/BWD 11/07/2024 2720 M/S PURBASHA 40.24 0.00 0 90
2351 PURBA BARDHAMAN Katwa-I Burdwan Division JAJIGRAM PIPE WATER SUPPLY SCHEME , SM/15151 New Material Requisition To Resource Division RTOR000149/2023-2024 2155/BWD 10/05/2023 0 Resource Division 13.59 0.00 0 0
2352 PURBA BARDHAMAN Katwa-I Burdwan Division JAJIGRAM PIPE WATER SUPPLY SCHEME , SM/15151 New Material Requisition To Resource Division RTOR000492/2023-2024 4016/BWD 08/09/2023 0 Resource Division 0.97 0.00 0 0
2353 PURBA BARDHAMAN Katwa-I Burdwan Division JAJIGRAM PIPE WATER SUPPLY SCHEME , SM/15151 New Material Requisition To Resource Division RTOR000631/2023-2024 4883/BWD 10/11/2023 0 Resource Division 28.85 0.00 0 0
2354 PURBA BARDHAMAN Katwa-I Central Mechanical JAJIGRAM PIPE WATER SUPPLY SCHEME , SM/15151 New New service connection charges for Jajigram PWSS TW-2 BILL/01539/2023-2024 BP-2023-24-206 30/10/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.31 0.00 0 0
2355 PURBA BARDHAMAN Katwa-I Central Mechanical JAJIGRAM PIPE WATER SUPPLY SCHEME , SM/15151 New New service connection charges for Jajigram PWSS TW-1 BILL/01476/2023-2024 BP-2023-24-174 29/09/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 5.42 0.00 0 0
2356 PURBA BARDHAMAN Katwa-I Burdwan Division JAJIGRAM PIPE WATER SUPPLY SCHEME , SM/15151 New Balance work for Balance work of OHR, construction Concrete Road, 1st Floor of Office Building, Functional Household Tap Connection, land development, Road restoration etc. of Gopekhanji, Jajigram & Gidhagram PWSS under KATWA -I Block, under Katwa Sub Division under Burdwan Divn, District:- Purba-Bardhaman. Assistant Engineer ORD/000503/2024-2025 3161/BWD 22/08/2024 120 POWER TOOLS & ENGINEERING 272.54 0.00 0 0
2357 PURBA BARDHAMAN Katwa-I Central Mechanical JAJIGRAM PIPE WATER SUPPLY SCHEME , SM/15151 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Jajigram & others water supply scheme under Katwa-I Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman Driller In-Charge Junior Engineer ORD/000069/2024-2025 2399/CMD 02/08/2024 90 SUBRATA BHADRA 55.16 0.00 0 0
2358 PURBA BARDHAMAN Katwa-I Central Mechanical JAJIGRAM PIPE WATER SUPPLY SCHEME , SM/15151 New Supply and installation of Electro-Magnetic flow meter at AURIA, KARUI & others water supply scheme under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. Driller In-Charge JUNIOR ENGINEER ORD/000602/2024-2025 3106/CMD 11/12/2024 60 S.K. ELECTRICALS 13.60 0.00 0 0
2359 PURBA BARDHAMAN Katwa-I Burdwan Division JAJIGRAM PIPE WATER SUPPLY SCHEME , SM/15151 New JAJIGRAM Piped Water Supply Scheme with sinking of Tube-well, LDS, Rising Main, FHTC, Construction of 250 cum capacity RCC OHR with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drain and internal pathway at different TW site under KATWA -I Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer JUNIOR ENGINEER KATWA SUB-DIVISION PHE DTE ORD/000742/2022-2023 1135/BWD 13/03/2023 749 POWER TOOLS & ENGINEERING 368.83 284.13 77.04 75
2360 PURBA BARDHAMAN Katwa-I Burdwan Division JAJIGRAM PIPE WATER SUPPLY SCHEME , SM/15151 New Construction of Office Cum Godown at Head work site of JAJIGRAM PWSS under Katwa Sub Division, within Burdwan Division PHE Dte. Assistant Engineer Junior Engineer, R.W.S., Katwa-I Dev. Block ORD/000854/2023-2024 5201/BWD 29/11/2023 180 SUBODH KUMAR MONDAL 37.69 32.70 86.76 10
2361 PURBA BARDHAMAN Katwa-I Burdwan Division JAJIGRAM PIPE WATER SUPPLY SCHEME , SM/15151 New Balance work for the construction of office cum Go-Down at ground floor at the head work site of JAJIGRAM PWSS under Katwa I Block under Katwa Sub-Division under Burdwan Division, PHE. Dte. Assistant Engineer ORD/001025/2024-2025 106/BWD 07/01/2025 60 SUBODH KUMAR MONDAL 9.11 0.00 0 0
2362 PURBA BARDHAMAN Central Mechanical AUGMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR CHHOTOBAINAN , SM/15194 Augmentation Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 at Augmentation of Chhotoboinan Water Supply Scheme [ Block- Raina-II ] ( Tube Well no 4 ) under CMD, PHE Dte., Dist.- Purba-Bardhaman ORD/000618/2022-2023 3142/CMD 29/11/2022 30 CHATTERJEE ENTERPRISE 10.99 10.60 96.45 0
2363 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR CHHOTOBAINAN , SM/15194 Augmentation Laying of Interconnection of 3rd Tube well Site of Chotobainan Piped Water Supply Scheme within Burdwan Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000090/2023-2024 737/BSD 20/04/2023 15 BRINDABAN KONAR 0.93 0.90 96.77 100
2364 PURBA BARDHAMAN Central Mechanical AUGMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR CHHOTOBAINAN , SM/15194 Augmentation Providing Electrical accessories for Tube well No. 2 of Chotobainan & others Water Supply Scheme under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000991/2023-2024 4347/CMD 19/09/2023 30 DUTTA ENTERPRISE 3.09 3.09 100 100
2365 PURBA BARDHAMAN Central Mechanical AUGMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR CHHOTOBAINAN , SM/15194 Augmentation Supply & Installation of Submersible Pumping Machinery , Voltage Stabilizer, Chlorination system and internal House wiring for Tube well no.- 1&2 at Augumentation of Chotoboinan Water Supply Scheme under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000083/2023-2024 2590/CMD 07/06/2023 30 CHOUDHURY ENTERPRISE 22.51 10.52 46.73 48
2366 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR CHHOTOBAINAN , SM/15194 Augmentation Sinking of 300 X 200mm dia Tube Well 150 mtr. Depth by D.R. Rig method using UPVC pipe (CD) and UPVC Deep Well Screen (RDS) for Aug. of CHHOTOBAINAN (NILEDIGHIR PAR) W/S Scheme under Raina-II Block within Burdwan Sub-Division, PHE Dte. [For 01 No. Tube well]. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000595/2023-2024 3768/BWD 29/08/2023 30 B.S. ENTERPRISE 13.13 10.52 80.12 100
2367 PURBA BARDHAMAN Central Mechanical AUGMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR CHHOTOBAINAN , SM/15194 Augmentation Procurement of electro-mechanical accessories for Chotoboinan Water Supply Scheme under JJM under CMD, PHE Dte. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/001017/2023-2024 529/CMSD 07/07/2023 30 JOYGURU ENTERPRISE 0.84 0.84 100 99
2368 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR CHHOTOBAINAN , SM/15194 Augmentation Construction of Switch room cum chlorine room with sanitary and water supply arrangement (P.H-4) at New Tube Well Site of CHOTOBAINAN and its adjoining Mouzas Pipe Water Supply Scheme of cracky nature of soil according to departmental drawing no.-PHE/BD/P.H/DRG-01/DCE-2017, Block:- Raina-II, under Burdwan Sub-Division, P.H.E Dte. within Burdwan Division P.H.E. Dte. Dist:Purba Bardhaman. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000972/2023-2024 001/BWD 02/01/2024 60 CHOWDHURY CONSTRUCTION 5.83 5.16 88.51 99
2369 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR CHHOTOBAINAN , SM/15194 Augmentation Preparation and Submission of DPR for Augmentation of Chhotobainan PWSS under Raina-II Development Block under Burdwan Division, P.H.E Dte (2nd Call) Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/001226/2023-2024 2974/BSD 20/12/2023 15 MEASURE LAND 0.78 0.78 100 100
2370 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR CHHOTOBAINAN , SM/15194 Augmentation Improvement/ Strenthenning of RCC Elevated Reservoir (Capacity 700 Cum) & pipe line of CHOTOBAINAN PWSS for smooth running of FHTC work under RAINA-II Block, District:- Purba- Bardhaman. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000295/2024-2025 1277/BSD 12/07/2024 60 ANWESHA CONSTRUCTION 3.34 0.00 0 100
2371 PURBA BARDHAMAN Central Mechanical AUGMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR CHHOTOBAINAN , SM/15194 Augmentation New service connection for Augmentation of Chotoboinan PWSS TW-4. BILL/02281/2023-2024 BP-2023-24-435 29/01/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 2.66 0.00 0 0
2372 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR CHHOTOBAINAN , SM/15194 Augmentation Balance Work for extension of pipe lines to provide FHTC With Sinking of Tubwell (Replacement TW), Repairing of pump house with Boundary wall at head worksite & other related works for CHOTOBAINAN PWSS under Burdwan Sub-Div., Block -Raina-II, under Burdwan Division PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/001099/2024-2025 435/BWD 20/01/2025 120 INDIAN ENGINEERS CO.-OPERATIVE SOCIETY LTD. 106.18 0.00 0 0
2373 PURBA BARDHAMAN Central Mechanical AUGMENTATION OF PANUHAT PIPED WATER SUPPLY SCHEME , SM/15555 Augmentation Yard lighting arrangement & allied works at Panuhat water supply scheme under Katwa-1 Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. Driller In-Charge JUNIOR ENGINEER ORD/000464/2024-2025 2791/CMD 01/10/2024 60 BEHERA ENTERPRISE 7.11 0.00 0 0
2374 PURBA BARDHAMAN Central Mechanical AUGMENTATION OF PANUHAT PIPED WATER SUPPLY SCHEME , SM/15555 Augmentation NEW SERVICE CONNECTION FOR ADDITIONAL TUBE WELL AT PANUHAT BILL/00128/2024-2025 BP-2024-25-62 26/04/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 5.52 0.00 0 0
2375 PURBA BARDHAMAN Central Mechanical AUGMENTATION OF PANUHAT PIPED WATER SUPPLY SCHEME , SM/15555 Augmentation Quotation for new service connection at Augmentation of Panuhat PWSS TW - 01. BILL/00749/2024-2025 BP-2024-25-283 10/09/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.98 0.00 0 0
2376 PURBA BARDHAMAN Central Mechanical AUGMENTATION OF PANUHAT PIPED WATER SUPPLY SCHEME , SM/15555 Augmentation Supply & Installation of Submersible Pumping Machinery , Voltage Stabilizer, Chlorination system and internal House wiring for Tube well no.- 1 at Augumentation of Panuhat Water Supply Scheme under CMD, PHE Dte., Dist.- Purba-Bardhaman. Driller In-Charge Junior Engineer ORD/000084/2023-2024 2581/CMD 07/06/2023 760 DUTTA ENTERPRISE 11.02 0.00 0 0
2377 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF PANUHAT PIPED WATER SUPPLY SCHEME , SM/15555 Augmentation Augmentation of PANUHAT Piped Water Supply Scheme with sinking of Tube-well, LDS, Rising Main, FHTC, Construction of 350 cum capacity RCC OHR with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drain and internal pathway at different TW site under KATWA-I Block, District:- Purba-Bardhaman. Assistant Engineer Junior Engineer, R.W.S., Katwa-I Dev. Block ORD/000858/2023-2024 5204/BWD 29/11/2023 489 SHUBHRA KANTI GHOSH 322.65 125.02 38.75 15
2378 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF PANUHAT PIPED WATER SUPPLY SCHEME , SM/15555 Augmentation Construction of Pump House, Boundary walls and Raising Main for Aug. of PANUHAT Piped W/S. Scheme under Katwa-I Block, District:- Purba-Bardhaman. Assistant Engineer Junior Engineer, R.W.S., Katwa-I Dev. Block ORD/000923/2023-2024 5484/BWD 13/12/2023 60 SUBODH KUMAR MONDAL 9.73 2.16 22.2 26
2379 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF PANUHAT PIPED WATER SUPPLY SCHEME , SM/15555 Augmentation Repairing work of 2 (TWO) Nos. Pump House in connection with Panuhat- Piped Water Supply Scheme (SM/15555) under Katwa Sub-Division under Burdwan Division, PHE Dte. (Sl No-4) Assistant Engineer Junior Engineer, R.W.S., Katwa-I Dev. Block ORD/001328/2024-2025 460/KTS 17/03/2025 30 HAMID SK 2.59 0.00 0 0
2380 PURBA BARDHAMAN Ketugram-I Central Drilling KULUTIA PIPED WATER SUPPLY SCHEME , SM/15167 New Providing drilling crew and other allied works for construction of Tube Well (250mm X200mm X 114 Mtrs. Depth) by utilising Departmental Machineries for Kulutia W/S Scheme (T/W-I & II) ,Ketugram-I Block under PurbaBardhman District, Central Drilling Division, P.H.E. Dte. Driller In Charge Junior Engineer ORD/000165/2023-2024 1349/CDD 13/09/2023 30 UNIVERSAL ENTERPRISES 16.66 0.00 0 0
2381 PURBA BARDHAMAN Ketugram-I Burdwan Division KULUTIA PIPED WATER SUPPLY SCHEME , SM/15167 New Material Requisition To Resource Division RTOR000390/2023-2024 2197/BWD 12/05/2023 0 Resource Division 10.23 0.00 0 0
2382 PURBA BARDHAMAN Ketugram-I Burdwan Division KULUTIA PIPED WATER SUPPLY SCHEME , SM/15167 New Material Requisition To Resource Division RTOR000407/2023-2024 3825/BWD 01/09/2023 0 Resource Division 2.16 0.00 0 0
2383 PURBA BARDHAMAN Ketugram-I Burdwan Division KULUTIA PIPED WATER SUPPLY SCHEME , SM/15167 New Material Requisition To Resource Division RTOR000740/2023-2024 5240/BWD 30/11/2023 0 Resource Division 20.18 0.00 0 0
2384 PURBA BARDHAMAN Ketugram-I Central Mechanical KULUTIA PIPED WATER SUPPLY SCHEME , SM/15167 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Rajur & others water supply scheme under Ketugram-I Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. Driller In-Charge Junior Engineer ORD/000098/2024-2025 2407/CMD 02/08/2024 90 M.S. ENTERPRISE 82.29 0.00 0 0
2385 PURBA BARDHAMAN Ketugram-I Central Mechanical KULUTIA PIPED WATER SUPPLY SCHEME , SM/15167 New New Service connection at Kulutia PWSS TW NO. 1 BILL/02370/2023-2024 BP-2023-24-491 01/02/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 4.01 0.00 0 0
2386 PURBA BARDHAMAN Ketugram-I Central Mechanical KULUTIA PIPED WATER SUPPLY SCHEME , SM/15167 New New service connection for Kulitia PWSS PH-2. BILL/02910/2023-2024 BP-2023-24-623 07/03/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.19 0.00 0 0
2387 PURBA BARDHAMAN Ketugram-I Burdwan Division KULUTIA PIPED WATER SUPPLY SCHEME , SM/15167 New Different works related (sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of different capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site) to AMEGERIA, ARGUN, CHINISPUR & KULUTIA Piped Water Supply Scheme under KETUGRAM -I Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer JUNIOR ENGINEER R.W.S. BURDWAN SUB-DIVISION PHE DTE ORD/000533/2023-2024 3630/BWD 21/08/2023 1107 M/S GOUTAM DAS 1,421.70 139.29 9.8 75
2388 PURBA BARDHAMAN Ketugram-I Central Mechanical KULUTIA PIPED WATER SUPPLY SCHEME , SM/15167 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at KULUTIA Water Supply Scheme [ Block- KETUGRAM-1] under CMD, PHE Dte., Dist.- Purba-Bardhaman. Driller In-Charge Junior Engineer ORD/000856/2023-2024 4124/CMD 29/08/2023 610 KAMAKHYA ENTERPRISE 26.93 0.00 0 46
2389 PURBA BARDHAMAN Ketugram-I Burdwan Division KULUTIA PIPED WATER SUPPLY SCHEME , SM/15167 New Road crossing through metal / concrete road by Jack Push Method for AMEGERIA (SM/16023), ARGUN (SM/16482), CHINISPUR (SM/15170) and KULITIA (SM/15167) PWSS under Ketugram I Development Block under Katwa Sub Division within Burdwan Division, PHE. Dte. Assistant Engineer JUNIOR ENGINEER R.W.S. BURDWAN SUB-DIVISION PHE DTE ORD/001311/2024-2025 977/BWD 13/03/2025 60 M/S GOUTAM DAS 39.22 0.00 0 100
2390 PURBA BARDHAMAN Burdwan Division AUGUMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR BALARAMPUR , SM/15181 Augmentation Sinking of 300 X 200mm dia Tube Well 150 mtr. Depth by D.R. Rig method using UPVC pipe (CD) and UPVC Deep Well Screen (RDS) for 3RD TW site of BALARAMPUR W/S Scheme under Jamalpur Block within Burdwan Sub-Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. RWS_JAMALPUR ORD/000202/2023-2024 2705/BWD 08/06/2023 30 TULIP ENGINEERS CO-OPERATIVE SOCIETY LTD. 13.26 12.64 95.32 100
2391 PURBA BARDHAMAN Burdwan Division AUGUMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR BALARAMPUR , SM/15181 Augmentation Preparation and Submission of DPR for Augmentation of Balarampur PWSS under Jamalpur Development Block under Burdwan Division, P.H.E Dte.[2nd Call] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. RWS_JAMALPUR ORD/000393/2023-2024 1528/BSD 17/07/2023 15 GEO-SOLUTION 0.78 0.77 98.72 100
2392 PURBA BARDHAMAN Burdwan Division AUGUMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR BALARAMPUR , SM/15181 Augmentation Extension of CIDF/DI Pipes with specials within command area of Balarampur piped W/S Scheme at Shalim Danga Sabgi Bazar,,Jamalpur Development Block under Burdwan Division,PHE Dte. [2nd Call]. ORD/000140/2023-2024 789/BSD 28/04/2023 15 GHOSH ENTERPRISE 0.32 0.32 100 100
2393 PURBA BARDHAMAN Burdwan Division AUGUMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR BALARAMPUR , SM/15181 Augmentation Construction of switch rooms & Rising main at different TW site for BALARAMPUR Piped Water Supply Scheme under Jamalpur Block, District:- Purba-Bardhaman under Burdwan Division, PHE. Dte. AE(HQs) Junior Engineer, Burdwan Division ORD/000594/2023-2024 3769/BWD 29/08/2023 60 SOUMYAVASH DAS 8.94 8.91 99.66 100
2394 PURBA BARDHAMAN Central Mechanical AUGUMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR BALARAMPUR , SM/15181 Augmentation Procurement of electro-mechanical accessories for Balarampur Water Supply Scheme under JJM under CMD, PHE Dte. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/001020/2023-2024 531/CMSD 07/07/2023 30 M/S. S.D. CONSTRUCTION 0.58 0.58 100 100
2395 PURBA BARDHAMAN Central Mechanical AUGUMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR BALARAMPUR , SM/15181 Augmentation New Service connection at BALARAMPUR PWSS TW-5. BILL/02364/2023-2024 BP-2023-24-482 31/01/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 16.19 0.00 0 0
2396 PURBA BARDHAMAN Central Mechanical AUGUMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR BALARAMPUR , SM/15181 Augmentation New service connection charges for Balarampur PWSS TW-4 BILL/02213/2023-2024 BP-2023-24-386 16/01/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 13.60 0.00 0 0
2397 PURBA BARDHAMAN Central Mechanical AUGUMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR BALARAMPUR , SM/15181 Augmentation Illumination arrangement and miscellaneous works at Balarampur water supply scheme under Jamalpur Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000444/2024-2025 2786/CMD 01/10/2024 60 A.K. ENTERPRISE 15.91 0.00 0 30
2398 PURBA BARDHAMAN Burdwan Division AUGUMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR BALARAMPUR , SM/15181 Augmentation Construction of Boundary wall, Land Development for various PWSS, Block- Jamalpur, District:- Purba-Bardhaman within Burdwan Sub Division under Burdwan Division PHE Dte. AE(HQs),AE(HQs), Burdwan Division, PHE Dte. Junior Engineer, Burdwan Division ORD/001100/2024-2025 433/BWD 20/01/2025 120 RABINDRA NATH GORANG 132.64 0.00 0 40
2399 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED SHYAMSUNDAR (PART B) PWSS , SM/15183 Augmentation Construction of Pump House cum chlorine room without sanitary and water supply arrangement at Tube Well Site to departmental drawing no-PHE/BD/P.H/DRG/02/DEC-17(Size 3.60 mtr x 3.00 mtr room) for SHYAMSUNDAR its Adjoining Mouza W/S Scheme, Block -Raina-I within Burdwan Sub-Division, PHE Dte. (Mouza- Gopinathpur) Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000770/2022-2023 505/BSD 21/03/2023 45 JYOTI ENTERPRISE 3.50 2.76 78.86 100
2400 PURBA BARDHAMAN Central Mechanical AUGMENTATION OF GROUND WATER BASED SHYAMSUNDAR (PART B) PWSS , SM/15183 Augmentation New service connection charges for Aug. Shyamsundar PWSS TW-4 BILL/01425/2023-2024 BP-2023-24-150 05/09/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 4.25 0.00 0 0
2401 PURBA BARDHAMAN Central Mechanical AUGMENTATION OF GROUND WATER BASED SHYAMSUNDAR (PART B) PWSS , SM/15183 Augmentation New service connection charges for Aug. of Shyamsundar PWSS TW-1 BILL/00855/2023-2024 BP-2023-24-104 07/08/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 7.18 0.00 0 0
2402 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED SHYAMSUNDAR (PART B) PWSS , SM/15183 Augmentation Construction of Pathway at Head Work site for SHYAMSUNDAR PIPED WATER SUPPLY SCHEME , Block- Raina-I , within Burdwan Sub Division under Burdwan Division PHE Dte. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000154/2024-2025 1040/BSD 10/06/2024 30 POMPA CONSTRUCTION CO. 0.93 0.00 0 0
2403 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED SHYAMSUNDAR (PART B) PWSS , SM/15183 Augmentation Land development at Head Work site for SHYAMSUNDAR PIPED WATER SUPPLY SCHEME , Block- Raina-I , within Burdwan Sub Division under Burdwan Division PHE Dte. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000167/2024-2025 1039/BSD 10/06/2024 30 MAA MAHAMAYA CONSTRUCTION 0.88 0.00 0 0
2404 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED SHYAMSUNDAR (PART B) PWSS , SM/15183 Augmentation Laying Parallel Pipeline, providing FHTC and Repairing of Pump House at 2nd Tube Well Site for Aug. of SHYAMSUNDAR Piped Water Supply Scheme, Block- Raina-I, within Burdwan Sub Division under Burdwan Division PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000224/2024-2025 2524/BWD 03/07/2024 90 DEBASHISH ENTERPRISE 22.66 0.00 0 0
2405 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED SHYAMSUNDAR (PART B) PWSS , SM/15183 Augmentation Augmentation of SHYAMSUNDAR Piped Water Supply Scheme with LDS, Rising Main, Construction of 350 Cum capacity OHR with 20.0 Mtr. Staging height inclusive of soil test, Construction of boundary wall at Head works & 2nd TW site & FHTC under Raina ¿ I Block, District - Purba Bardhaman. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000598/2021-2022 1474/BWD 14/03/2022 365 SK ALIM 474.78 61.66 12.99 100
2406 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED SHYAMSUNDAR (PART B) PWSS , SM/15183 Augmentation Allied works for Augmentation of SHYAMSUNDAR W/S Scheme under Burdwan Division, PHE. Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. Junior Engineer1, Durgapur Sub-Division, PHE Dte. ORD/000346/2023-2024 3035/BWD 14/07/2023 90 SK ALIM 113.11 94.14 83.23 100
2407 PURBA BARDHAMAN Central Mechanical AUGMENTATION OF GROUND WATER BASED SHYAMSUNDAR (PART B) PWSS , SM/15183 Augmentation Making illumination arrangement and mise works at SHYAMSUNDAR water supply scheme RAINA-I BLOCK under Central Mechanical Division P.H.E. Dte. Purba-Bardhaman. ASSISTANT ENGINEER Junior Engineer ORD/000474/2024-2025 2954/CMD 20/11/2024 60 CHATTERJEE ENTERPRISE 14.87 0.00 0 30
2408 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED SHYAMSUNDAR (PART B) PWSS , SM/15183 Augmentation Conducting physical Household Survey at the IMIS reported village for HGJ certification and providing balance FHTC for Har Ghar Jal certification including conducting Gram Sabhas for different IMIS reported villages across the district under Burdwan Division, PHE Dte. AE(HQs),Assistant Engineer ,Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE.,Assistant Engineer, Durgapur Sub Division, P.H.E. Dte JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000428/2024-2025 3107/BWD 12/08/2024 323 TUBGRAM GRAMMYAK UNNAYAN SAMITY 309.60 0.00 0 85
2409 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED SHYAMSUNDAR (PART B) PWSS , SM/15183 Augmentation Designing, making and erection of Sign Board for SWAJAL GRAM in Muktipur village of Raina-I Block under Shyamsundar Piped Water Supply Scheme within Burdwan Sub-Division under Burdwan Division, PHE Dte (5 nos Board) JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000617/2025-2026 2369/BSD 21/08/2025 10 S.M. ENGOCON 0.72 0.00 0 0
2410 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR RUPPUR , SM/15185 Augmentation Preparation and Submission of DPR for Augmentation of Ruppur PWSS under Jamalpur Development Block under Burdwan Division, P.H.E Dte.[2nd Call] ORD/000351/2023-2024 1478/BSD 12/07/2023 15 CARTO 0.78 0.77 98.72 100
2411 PURBA BARDHAMAN Central Mechanical AUGMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR RUPPUR , SM/15185 Augmentation Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.- 3 at Augumentation of RUPPUR Water Supply Scheme [BLOCK- JAMALPUR] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/001609/2023-2024 1540/CMD 05/03/2024 60 KAMAKHYA ENTERPRISE 12.33 0.00 0 0
2412 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR RUPPUR , SM/15185 Augmentation Providing FHTC for 100% coverage at RUPPUR & Dhuluk Habitation (Village) for RUPPUR Piped W/S Scheme, Jamalpur Dev. Block under Burdwan Division, PHE Dte. AE(HQs) Junior Engineer, Burdwan Division ORD/000125/2023-2024 2315/BWD 19/05/2023 60 MAJILA ENTERPRISE 62.34 59.96 96.18 100
2413 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR RUPPUR , SM/15185 Augmentation Relaying and replace of damaged HDPE pipeline with repairing of valve for control of water flow within command area of RUPPUR Piped W/S Scheme at Ruppur Habitation,Jamalpur Development Block under Burdwan Division PHE Dte. RWS_JAMALPUR ORD/000155/2024-2025 1044/BSD 10/06/2024 30 SANDIPAN SENGUPTA 0.65 0.65 100 100
2414 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR RUPPUR , SM/15185 Augmentation Sinking of 300 mm X 200 mm dia Tube Well 150 mtr. Depth by D.R. Rig method using UPVC pipe (CM) and UPVC Medium Well Screen (RMS) with construction of Pump House, Boundary wall, Land Development and Rising main connection of RUPPUR Piped Water Supply Scheme, Block- Jamalpur, District:- Purba-Bardhaman under Burdwan Division PHE Dte. [FOR 3rd. TUBE WELL SITE] AE(HQs) Junior Engineer, Burdwan Division ORD/000996/2024-2025 4593/BWD 31/12/2024 120 HI-LIGHT ELECTRONICS 26.20 5.39 20.57 30
2415 PURBA BARDHAMAN Central Mechanical AUGMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR RUPPUR , SM/15185 Augmentation Illumination arrangement and miscellaneous works at Ruppur water supply scheme under Jamalpur Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000473/2024-2025 2947/CMD 20/11/2024 60 M/S. SWAPAN BANERJEE 19.64 0.00 0 30
2416 PURBA BARDHAMAN Raina-I Burdwan Division RASUIKHANDA PIPED WATER SUPPLY SCHEME , SM/16253 New Material Requisition To Resource Division RTOR000184/2023-2024 2155/BWD 10/05/2023 0 Resource Division 7.15 0.00 0 0
2417 PURBA BARDHAMAN Raina-I Burdwan Division RASUIKHANDA PIPED WATER SUPPLY SCHEME , SM/16253 New Material Requisition To Resource Division RTOR000484/2023-2024 4008/BWD 08/09/2023 0 Resource Division 2.23 0.00 0 0
2418 PURBA BARDHAMAN Raina-I Burdwan Division RASUIKHANDA PIPED WATER SUPPLY SCHEME , SM/16253 New Material Requisition To Resource Division RTOR000688/2023-2024 5065/BWD 23/11/2023 0 Resource Division 20.46 0.00 0 0
2419 PURBA BARDHAMAN Raina-I Central Mechanical RASUIKHANDA PIPED WATER SUPPLY SCHEME , SM/16253 New New service connection charges for Rasuikhanda PWSS TW-2 BILL/01426/2023-2024 BP-2023-24-153 05/09/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 8.70 0.00 0 0
2420 PURBA BARDHAMAN Raina-I Central Mechanical RASUIKHANDA PIPED WATER SUPPLY SCHEME , SM/16253 New New service connection charges for Rasuikhanda PWSS TW 1 BILL/01371/2023-2024 BP-2023-24-139 25/08/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 10.04 0.00 0 0
2421 PURBA BARDHAMAN Raina-I Burdwan Division RASUIKHANDA PIPED WATER SUPPLY SCHEME , SM/16253 New Continuation order for "Supply of one No. Diesel Driven Ambassador Car on hire basis for the office of the Assistant Engineer, Burdwan Sub-Division, PHE Dte for the period of 01.12.2023 to 31.05.2024 Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/001007/2023-2024 2751/BSD 28/11/2023 183 SK.ASFIA 2.40 0.40 16.67 70
2422 PURBA BARDHAMAN Raina-I Central Mechanical RASUIKHANDA PIPED WATER SUPPLY SCHEME , SM/16253 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Bajitpur, Belsar & other water supply scheme under Raina-1 Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000117/2024-2025 2589/CMD 27/08/2024 90 DEY ENTERPRISE 74.58 0.00 0 10
2423 PURBA BARDHAMAN Raina-I Burdwan Division RASUIKHANDA PIPED WATER SUPPLY SCHEME , SM/16253 New Balance work [i.e. Extension or parallel Pipeline, Leftout FHTC, Road Restoration work, Sinking of Additional Tube Well with Pump House & Boundary wall, inter Connection of Additional Tube Well, Construction of M.S.Structural bridge, canal Crossing, MS casing with allied work of Bhagabatipur, Machkhara, Udgara, Bantir, Chakpurohit Rasuikhanda, Sankarpur, Gopalpur & Belshar PWSS Block-RAINA- I under Burdwan Sub Division, PHE Dte. within Burdwan Division PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/001103/2024-2025 469/BWD 24/01/2025 366 SK ALIM 1,353.91 0.00 0 25
2424 PURBA BARDHAMAN Central Mechanical AUGMENTATION OF KSHETPUR PALASHI PIPED WATER SUPPLY SCHEME , SM/16016 Augmentation Supply & Installation of Submersible Pumping Machinery , Voltage Stabilizer, Chlorination system and internal House wiring for Tube well no.- 1&2 at Augumentation of Kshetpur Plasi Water Supply Scheme under CMD, PHE Dte., Dist.- Purba-Bardhaman. Driller In-Charge Junior Engineer ORD/000094/2023-2024 2585/CMD 07/06/2023 820 SOUNAK ENTERPRISE 22.60 10.29 45.53 48
2425 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF KSHETPUR PALASHI PIPED WATER SUPPLY SCHEME , SM/16016 Augmentation Augmentation of KSHETPUR PALASHI Piped Water Supply Scheme with sinking of Tube-well, LDS, Rising Main, FHTC & Renovation of switch-rooms & boundary walls at different TW site under Katwa-II Block, District:- Purba-Bardhaman. Assistant Engineer JUNIOR ENGINEER KATWA SUB-DIVISION PHE DTE ORD/000117/2023-2024 2303/BWD 19/05/2023 448 SHUBHRA KANTI GHOSH 121.71 46.04 37.83 95
2426 PURBA BARDHAMAN Central Mechanical AUGMENTATION OF KSHETPUR PALASHI PIPED WATER SUPPLY SCHEME , SM/16016 Augmentation New service connection charges for Kshetpur Palashi PWSS TW-1 BILL/01764/2023-2024 BP-2023-24-280 21/12/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 4.00 0.00 0 0
2427 PURBA BARDHAMAN Raina-I Burdwan Division SIPTA PIPED WATER SUPPLY SCHEME , SM/16618 New Material Requisition To Resource Division RTOR000155/2023-2024 2155/BWD 10/05/2023 0 Resource Division 8.72 0.00 0 0
2428 PURBA BARDHAMAN Raina-I Burdwan Division SIPTA PIPED WATER SUPPLY SCHEME , SM/16618 New Material Requisition To Resource Division RTOR000694/2023-2024 5058/BWD 23/11/2023 0 Resource Division 20.46 0.00 0 0
2429 PURBA BARDHAMAN Raina-I Central Mechanical SIPTA PIPED WATER SUPPLY SCHEME , SM/16618 New New service connection charges for Sipta PWSS TW-1 BILL/00795/2023-2024 BP-2023-24-88 26/07/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 2.76 0.00 0 0
2430 PURBA BARDHAMAN Raina-I Central Mechanical SIPTA PIPED WATER SUPPLY SCHEME , SM/16618 New New service connection charges for Sipta PWSS TW-2 BILL/00796/2023-2024 BP-2023-24-89 26/07/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.07 0.00 0 0
2431 PURBA BARDHAMAN Raina-I Burdwan Division SIPTA PIPED WATER SUPPLY SCHEME , SM/16618 New Providing 20 Nos.FHTC at SIPTA village for declearation of SWAJALGRAM under SIPTA Piped Water Supply Scheme, Block- Raina-I within Burdwan Sub Division under Burdwan Division PHE Dte JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000514/2024-2025 1861/BSD 22/08/2024 30 ROY CONSTRUCTION 0.96 0.00 0 0
2432 PURBA BARDHAMAN Raina-I Burdwan Division SIPTA PIPED WATER SUPPLY SCHEME , SM/16618 New SIPTA Single Village Scheme with sinking of Tube-well & construction of switch rooms & boundary walls with gates and land development, drain and internal pathway at different TW site under Raina-I Block, District:- Purba-Bardhaman [NEW SCHEME]. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000794/2022-2023 1444/BWD 24/03/2023 90 S.B. ASSOCIATES 49.61 49.53 99.84 100
2433 PURBA BARDHAMAN Raina-I Burdwan Division SIPTA PIPED WATER SUPPLY SCHEME , SM/16618 New SIPTA Single Village Scheme with sinking of LDS, Rising Main and FHTC under Raina-I Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000100/2023-2024 2258/BWD 18/05/2023 90 ROY CONSTRUCTION 115.09 115.04 99.96 100
2434 PURBA BARDHAMAN Raina-I Central Mechanical SIPTA PIPED WATER SUPPLY SCHEME , SM/16618 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at Sipta Water Supply Scheme [ Block- Raina-1 ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000147/2023-2024 2880/CMD 07/07/2023 30 S.G. ENTERPRISE 28.95 24.34 84.08 95
2435 PURBA BARDHAMAN Raina-I Burdwan Division SIPTA PIPED WATER SUPPLY SCHEME , SM/16618 New Construction of approach road near 2nd. Tube well site of SIPTA Water Supply Scheme [New Scheme], Raina-I, under Burdwan Sub Division PHE Dte. under Burdwan Division PHE. Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/001046/2024-2025 211/BWD 09/01/2025 30 SAIKAT RAY 7.20 0.00 0 0
2436 PURBA BARDHAMAN Raina-I Central Mechanical SIPTA PIPED WATER SUPPLY SCHEME , SM/16618 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Bajitpur, Belsar & other water supply scheme under Raina-1 Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000117/2024-2025 2589/CMD 27/08/2024 90 DEY ENTERPRISE 74.58 0.00 0 10
2437 PURBA BARDHAMAN Khandaghosh Burdwan Division ONARI PIPED WATER SUPPLY SCHEME , SM/18246 New Material Requisition To Resource Division RTOR000359/2023-2024 2197/BWD 12/05/2023 0 Resource Division 14.41 0.00 0 0
2438 PURBA BARDHAMAN Khandaghosh Burdwan Division ONARI PIPED WATER SUPPLY SCHEME , SM/18246 New Material Requisition To Resource Division RTOR000685/2023-2024 5075/BWD 23/11/2023 0 Resource Division 20.46 0.00 0 0
2439 PURBA BARDHAMAN Khandaghosh Burdwan Division ONARI PIPED WATER SUPPLY SCHEME , SM/18246 New Material Requisition To Resource Division RTOR000403/2023-2024 3829/BWD 01/09/2023 0 Resource Division 24.57 0.00 0 0
2440 PURBA BARDHAMAN Khandaghosh Central Mechanical ONARI PIPED WATER SUPPLY SCHEME , SM/18246 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at BICHKHARA & others water supply scheme under Khandoghosh Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman ASSISTANT ENGINEER Junior Engineer ORD/000064/2024-2025 2390/CMD 02/08/2024 90 MS DAS ELECTRIC CO 46.54 0.00 0 0
2441 PURBA BARDHAMAN Khandaghosh Central Mechanical ONARI PIPED WATER SUPPLY SCHEME , SM/18246 New New Service connection for Onari PWSS TW-2. BILL/02897/2023-2024 BP-2023-24-620 07/03/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 7.68 0.00 0 0
2442 PURBA BARDHAMAN Khandaghosh Central Mechanical ONARI PIPED WATER SUPPLY SCHEME , SM/18246 New New service connection for Onari PWSS TW-1. BILL/02892/2023-2024 BP-2023-24-619 07/03/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 7.68 0.00 0 0
2443 PURBA BARDHAMAN Khandaghosh Burdwan Division ONARI PIPED WATER SUPPLY SCHEME , SM/18246 New Different works related (sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of different capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site) to ONARI & SASANGA Piped Water Supply Scheme under Khandaghosh Block, District:- Purba-Bardhaman [NEW SCHEME]_2ND CALL Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000452/2023-2024 3430/BWD 07/08/2023 786 M/S JAN MAHAMMAD 1,398.82 323.66 23.14 50
2444 PURBA BARDHAMAN Khandaghosh Central Mechanical ONARI PIPED WATER SUPPLY SCHEME , SM/18246 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at Onari Water Supply Scheme [ Block- Khandogosh ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER Junior Engineer ORD/000680/2023-2024 4012/CMD 29/08/2023 30 M/S. S.R. ENTERPRISE 28.09 0.00 0 95
2445 PURBA BARDHAMAN Khandaghosh Burdwan Division ONARI PIPED WATER SUPPLY SCHEME , SM/18246 New Repairing damaged concrete road by Cement concrete (mix 1:1.5:3) and drainage system, Sluice valve chamber for FHTC work for KHANDAGHOSH, TARAPOSH, SAGRAI, SANKARI, KHUDKURI, ONARI PWSS and its adjoining mouzas within KHANDAGHOSH BLOCK under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000689/2024-2025 3684/BWD 23/10/2024 90 SUPRIYA RAY 115.68 0.00 0 20
2446 PURBA BARDHAMAN Khandaghosh Burdwan Division ONARI PIPED WATER SUPPLY SCHEME , SM/18246 New Field level data validation of FHTC executed by Agencies on the basis of pictorial data with the objective of controlling multiple entry,improving data quality in terms of absolute household by verification through electric connection or any other unique documents and making error free database of ONARI Pipe Water Supply Scheme in Khandaghosh Block within Burdwan Sub-Division under Burdwan Division,PHE Dte. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000892/2024-2025 2672/BSD 04/12/2024 30 TECHVISION 0.99 0.00 0 100
2447 PURBA BARDHAMAN Khandaghosh Burdwan Division ONARI PIPED WATER SUPPLY SCHEME , SM/18246 New Continuation Work Order for Supply of one No.Diesel Driven Ambassador Car on hire basis for the office of the Assistant Engineer, Burdwan Sub-Division,PHE Dte(Period from 01-09-2025 to 30.11.2025) JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000693/2025-2026 2473/BSD 29/08/2025 91 SK. ASFIA 1.20 0.00 0 0
2448 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Kulti Piped Water Supply Scheme at Kalna-II Block , SM/07826 Retrofitting Providing Functional Household tap connection (FHTC) from existing distribution system within the command area of Kulti piped water supply scheme at Chagram village (Chagram habitation), Dakshin Krishnapur village (Krishnapur habitation), Kala village (Anandanagar, Baganpara, Kala & Saklompur habitation), Kulti village (Dhapaspara & Kulti habitation), Dampara village (Dampara habitation) & Kashipur village (Kashipur habitation), Kalna-II Block under Burdwan Division, PHE Dte.[Tr No.-108/SE/CC/20-21] Assistant Engineer ORD/000405/2020-2021 1130/BWD 09/02/2021 60 UMWELT ENGINEER PVT LTD 103.15 62.13 60.23 1
2449 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Kulti Piped Water Supply Scheme at Kalna-II Block , SM/07826 Retrofitting Providing leftout water tap connection in different villages for 100% coverage to make it Sajal Gram from existing distribution system within scheme jurisdiction of different Piped Water Supply Schemes within Kalna ¿ II Block under Burdwan Division, PHE. Dte. Assistant Engineer JUNIOR ENGINEER R.W.S. BURDWAN SUB-DIVISION PHE DTE ORD/000476/2021-2022 943/BWD 17/02/2022 30 UDYOG CONSTRUCTION 5.27 4.65 88.24 100
2450 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Kulti Piped Water Supply Scheme at Kalna-II Block , SM/07826 Retrofitting Restoration work of Singerkone to Pandua Kulti road via badla from 0.00 km to 2.90 km, (in stretches) damaged due to laying of underground water pipe line by PHE with box cutting and Jhama with moorum consolidation under-Kalna Highvway Sub Division of Burdwan South Highway Division, P.W(Roads)Dte. during the year 2023-24. BILL/00648/2024-2025 825/JJM 13/09/2024 0 EXECUTIVE ENGINEER BURDWAN SOUTH HIGHWAY DIVISION P.W. (ROADS) DTE. 5.36 0.00 0 0
2451 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Kulti Piped Water Supply Scheme at Kalna-II Block , SM/07826 Retrofitting Different types of works involve in connection with Augmentation of KULTI (SM/16301) Water Supply Scheme, Block Kalna II under Burdwan Division, PHE Dte. Assistant Engineer JUNIOR ENGINEER RWS KALNA2 ORD/000235/2024-2025 2553/BWD 04/07/2024 240 HAMID SK 222.11 0.00 0 80
2452 PURBA BARDHAMAN Katwa-I Burdwan Division BANDMURA PIPED WATER SUPPLY SCHEME , SM/18480 New Material Requisition To Resource Division RTOR000549/2023-2024 4312/BWD 29/09/2023 0 Resource Division 73.01 0.00 0 0
2453 PURBA BARDHAMAN Katwa-I Burdwan Division BANDMURA PIPED WATER SUPPLY SCHEME , SM/18480 New BANDMURA Piped Water Supply Scheme with sinking of Tube-well, LDS, Rising Main, FHTC, Construction of 600 cum capacity RCC OHR with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drain and internal pathway at different TW site under Katwa-I Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer JUNIOR ENGINEER KATWA SUB-DIVISION PHE DTE,Junior Engineer, R.W.S., Katwa-I Dev. Block ORD/000830/2023-2024 5007/BWD 22/11/2023 406 MANASH GHOSH 883.19 181.59 20.56 35
2454 PURBA BARDHAMAN Katwa-I Central Mechanical BANDMURA PIPED WATER SUPPLY SCHEME , SM/18480 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Jajigram & others water supply scheme under Katwa-I Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman Driller In-Charge Junior Engineer ORD/000069/2024-2025 2399/CMD 02/08/2024 90 SUBRATA BHADRA 55.16 0.00 0 0
2455 PURBA BARDHAMAN Katwa-I Burdwan Division BANDMURA PIPED WATER SUPPLY SCHEME , SM/18480 New Material Requisition To Resource Division RTOR000767/2023-2024 208/BWD 10/01/2024 0 Resource Division 21.50 0.00 0 0
2456 PURBA BARDHAMAN Katwa-I Central Mechanical BANDMURA PIPED WATER SUPPLY SCHEME , SM/18480 New New service connection for Bandhmura PWSS PH-3. BILL/02906/2023-2024 BP-2023-24-615 07/03/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.32 0.00 0 0
2457 PURBA BARDHAMAN Katwa-I Central Mechanical BANDMURA PIPED WATER SUPPLY SCHEME , SM/18480 New NEW SERVICE CONNECTION FOR BANDMURA PWSS TW 1. BILL/02490/2023-2024 BP-2023-24-536 15/02/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 12.36 0.00 0 0
2458 PURBA BARDHAMAN Katwa-I Central Mechanical BANDMURA PIPED WATER SUPPLY SCHEME , SM/18480 New Quotation for new service connection for Bandmura PWSS TW-2. BILL/00776/2024-2025 BP-2024-25-292 13/09/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.03 0.00 0 0
2459 PURBA BARDHAMAN Katwa-I Central Mechanical BANDMURA PIPED WATER SUPPLY SCHEME , SM/18480 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1, 2 & 3 at BANDMURA Water Supply Scheme [ Block- KATWA-1 ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. Driller In-Charge Junior Engineer ORD/000869/2023-2024 4132/CMD 29/08/2023 590 GLACIER ENGINEERING CO 44.42 23.74 53.44 31
2460 PURBA BARDHAMAN Katwa-I Central Mechanical BANDMURA PIPED WATER SUPPLY SCHEME , SM/18480 New Hiring of Inspection Vehicle ( Diesel/CNG/LPG Driven) for supervision of JJM works under the jurisdiction of the Driller In charge, Bardhaman Mechanical Sub Division(Drilling) under CMD, PHE, Dte , w.e.f : 01/ 01/ 2025 to 28/02/2025 Driller In-Charge JUNIOR ENGINEER ORD/000657/2024-2025 922/DIC/BMSD(D) 26/12/2024 59 SUBRATA BHADRA 0.80 0.74 92.5 0
2461 PURBA BARDHAMAN Katwa-I Central Mechanical BANDMURA PIPED WATER SUPPLY SCHEME , SM/18480 New continuation order for Hiring of Inspection Vehicle ( Diesel/CNG/LPG Driven) for supervision of JJM works under the jurisdiction of the Driller In charge, Bardhaman Mechanical Sub Division(Drilling) under CMD, PHE, Dte ,wef : 01/ 11/ 20 24 to 31/12/2024. Driller In-Charge Junior Engineer ORD/000526/2024-2025 739/DIC/BMSD(D) 25/10/2024 61 SUBRATA BHADRA 0.81 0.78 96.3 0
2462 PURBA BARDHAMAN Katwa-I Central Mechanical BANDMURA PIPED WATER SUPPLY SCHEME , SM/18480 New Continuation order for hiring of Inspection Vehicle ( Diesel/CNG/LPG Driven) for supervision of JJM works under the jurisdiction of the Driller In charge, Bardhaman Mechanical Sub Division(Drilling) under CMD, PHE, Dte , w.e.f : 01/05/2025 to 30/06/2025. Driller In-Charge JUNIOR ENGINEER ORD/000009/2025-2026 248/DIC/BMSD(D) 23/04/2025 61 SUBRATA BHADRA 0.81 0.67 82.72 0
2463 PURBA BARDHAMAN Katwa-I Central Mechanical BANDMURA PIPED WATER SUPPLY SCHEME , SM/18480 New Continuation order for hiring of Inspection Vehicle ( Diesel/CNG/LPG Driven) for supervision of JJM works under the jurisdiction of the Driller In charge, Bardhaman Mechanical Sub Division(Drilling) under CMD, PHE, Dte , w.e.f : 01/03/2025 to 30/04/2025. Driller In-Charge JUNIOR ENGINEER ORD/000917/2024-2025 134/DIC/BMSD(D) 24/02/2025 61 SUBRATA BHADRA 0.81 0.75 92.59 0
2464 PURBA BARDHAMAN Katwa-I Central Mechanical BANDMURA PIPED WATER SUPPLY SCHEME , SM/18480 New Continuation order for hiring of Inspection Vehicle ( Diesel/CNG/LPG Driven) for supervision of JJM works under the jurisdiction of the Driller In charge, Bardhaman Mechanical Sub Division(Drilling) under CMD, PHE, Dte , w.e.f : 01/07/2025 to 30/08/2025. Driller In-Charge JUNIOR ENGINEER ORD/000077/2025-2026 476/DIC/BMSD(D) 26/06/2025 61 SUBRATA BHADRA 0.81 0.00 0 0
2465 PURBA BARDHAMAN Raina-I Burdwan Division BELSHAR PIPED WATER SUPPLY SCHEME , SM/18338 New Material Requisition To Resource Division RTOR000423/2023-2024 3860/BWD 01/09/2023 0 Resource Division 3.41 0.00 0 0
2466 PURBA BARDHAMAN Raina-I Burdwan Division BELSHAR PIPED WATER SUPPLY SCHEME , SM/18338 New Material Requisition To Resource Division RTOR000247/2023-2024 2197/BWD 12/05/2023 0 Resource Division 1.80 0.00 0 0
2467 PURBA BARDHAMAN Raina-I Burdwan Division BELSHAR PIPED WATER SUPPLY SCHEME , SM/18338 New Material Requisition To Resource Division RTOR000654/2023-2024 5100/BWD 23/11/2023 0 Resource Division 20.46 0.00 0 0
2468 PURBA BARDHAMAN Raina-I Central Mechanical BELSHAR PIPED WATER SUPPLY SCHEME , SM/18338 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at Belshar Water Supply Scheme [ Block- Raina-1 ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000719/2023-2024 4030/CMD 29/08/2023 474 SINHA ELECTRICALS 28.97 25.18 86.92 96
2469 PURBA BARDHAMAN Raina-I Burdwan Division BELSHAR PIPED WATER SUPPLY SCHEME , SM/18338 New Material Requisition To Resource Division RTOR000006/2024-2025 4115/BWD 25/11/2024 0 Resource Division 21.15 0.00 0 0
2470 PURBA BARDHAMAN Raina-I Central Mechanical BELSHAR PIPED WATER SUPPLY SCHEME , SM/18338 New New electric connection for Belswar PWSS, PH-1. BILL/01872/2023-2024 BP-2023-24-360 11/01/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 9.01 0.00 0 0
2471 PURBA BARDHAMAN Raina-I Central Mechanical BELSHAR PIPED WATER SUPPLY SCHEME , SM/18338 New NEW SERVICE CONNECTION FOR BELSHAR PWSS TW 2. BILL/03182/2023-2024 BP-2023-24-666 22/03/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 7.39 0.00 0 0
2472 PURBA BARDHAMAN Raina-I Burdwan Division BELSHAR PIPED WATER SUPPLY SCHEME , SM/18338 New Different works related (sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of different capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site) to BELSHAR & SANKARPUR Piped Water Supply Scheme under Raina ¿ I Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000411/2023-2024 3256/BWD 27/07/2023 1101 SK ALIM 1,345.74 541.33 40.23 85
2473 PURBA BARDHAMAN Raina-I Central Mechanical BELSHAR PIPED WATER SUPPLY SCHEME , SM/18338 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Bajitpur, Belsar & other water supply scheme under Raina-1 Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000117/2024-2025 2589/CMD 27/08/2024 90 DEY ENTERPRISE 74.58 0.00 0 10
2474 PURBA BARDHAMAN Raina-I Burdwan Division BELSHAR PIPED WATER SUPPLY SCHEME , SM/18338 New Balance work [i.e. Extension or parallel Pipeline, Leftout FHTC, Road Restoration work, Sinking of Additional Tube Well with Pump House & Boundary wall, inter Connection of Additional Tube Well, Construction of M.S.Structural bridge, canal Crossing, MS casing with allied work of Bhagabatipur, Machkhara, Udgara, Bantir, Chakpurohit Rasuikhanda, Sankarpur, Gopalpur & Belshar PWSS Block-RAINA- I under Burdwan Sub Division, PHE Dte. within Burdwan Division PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/001103/2024-2025 469/BWD 24/01/2025 366 SK ALIM 1,353.91 0.00 0 25
2475 PURBA BARDHAMAN Burdwan-I,Khandaghosh Burdwan Division NALA PIPED WATER SUPPLY SCHEME , SM/18256 New Material Requisition To Resource Division RTOR000396/2023-2024 2197/BWD 12/05/2023 0 Resource Division 17.83 0.00 0 0
2476 PURBA BARDHAMAN Burdwan-I,Khandaghosh Burdwan Division NALA PIPED WATER SUPPLY SCHEME , SM/18256 New Material Requisition To Resource Division RTOR000412/2023-2024 3868/BWD 01/09/2023 0 Resource Division 3.83 0.00 0 0
2477 PURBA BARDHAMAN Burdwan-I,Khandaghosh Burdwan Division NALA PIPED WATER SUPPLY SCHEME , SM/18256 New Material Requisition To Resource Division RTOR000679/2023-2024 5054/BWD 23/11/2023 0 Resource Division 20.46 0.00 0 0
2478 PURBA BARDHAMAN Burdwan-I,Khandaghosh Central Mechanical NALA PIPED WATER SUPPLY SCHEME , SM/18256 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at Nala Water Supply Scheme [ Block- Burdwan-1 ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER Junior Engineer ORD/000659/2023-2024 4002/CMD 29/08/2023 528 P.K. ENGINEERING 28.89 11.40 39.46 95
2479 PURBA BARDHAMAN Burdwan-I,Khandaghosh Central Mechanical NALA PIPED WATER SUPPLY SCHEME , SM/18256 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at MALKITA & others water supply scheme under Bardhaman-I Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman ASSISTANT ENGINEER Junior Engineer ORD/000066/2024-2025 2388/CMD 02/08/2024 90 ELECTRICAL & MECHANICAL ENGINEERING CORPORATION 55.95 0.00 0 0
2480 PURBA BARDHAMAN Burdwan-I,Khandaghosh Central Mechanical NALA PIPED WATER SUPPLY SCHEME , SM/18256 New New service connection at NALA PWSS Ph-2 BILL/02328/2023-2024 BP-2023-24-445 29/01/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.37 0.00 0 0
2481 PURBA BARDHAMAN Burdwan-I,Khandaghosh Central Mechanical NALA PIPED WATER SUPPLY SCHEME , SM/18256 New New service connection at NALA PWSS Ph-1 BILL/02327/2023-2024 BP-2023-24-444 29/01/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 5.20 0.00 0 0
2482 PURBA BARDHAMAN Burdwan-I,Khandaghosh Burdwan Division NALA PIPED WATER SUPPLY SCHEME , SM/18256 New NALA Piped Water Supply Scheme with sinking of Tube-well, LDS, Rising Main, FHTC, Construction of 400 cum capacity RCC OHR with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drain and internal pathway at different TW site under Burdwan-I Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000425/2023-2024 3327/BWD 02/08/2023 669 MD HASIN 752.05 277.01 36.83 75
2483 PURBA BARDHAMAN Burdwan-I,Khandaghosh Burdwan Division NALA PIPED WATER SUPPLY SCHEME , SM/18256 New Balance work i.e. Extension or parallel Pipeline, Leftout FHTC, Road Restoration work, Sinking of Additional Tube Well with Pump House & Boundary wall, Solar System with structure, inter Connection of Additional Tube Well, & allied work for NALA Piped Water Supply Scheme under Burdwan Sub Division, PHE Dte. within Burdwan Division PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/001266/2024-2025 847/BWD 05/03/2025 120 DIAMOND ENGINEERS CO-OP SOCIETY LTD. 184.95 0.00 0 0
2484 PURBA BARDHAMAN Mangolkote Burdwan Division LAKSHIMPUR PWSS , SM/18457 New Material Requisition To Resource Division RTOR000569/2023-2024 4941/BWD 10/11/2023 0 Resource Division 27.49 0.00 0 0
2485 PURBA BARDHAMAN Mangolkote Burdwan Division LAKSHIMPUR PWSS , SM/18457 New Material Requisition To Resource Division RTOR000527/2023-2024 4302/BWD 29/09/2023 0 Resource Division 10.51 0.00 0 0
2486 PURBA BARDHAMAN Mangolkote Burdwan Division LAKSHIMPUR PWSS , SM/18457 New Material Requisition To Resource Division RTOR000773/2023-2024 206/BWD 10/01/2024 0 Resource Division 17.75 0.00 0 0
2487 PURBA BARDHAMAN Mangolkote Central Mechanical LAKSHIMPUR PWSS , SM/18457 New NEW SERVICE CONNECTION FOR LAKSHIMPUR PWSS TW-1 BILL/00188/2024-2025 BP-2024-25-89 15/05/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.14 0.00 0 0
2488 PURBA BARDHAMAN Mangolkote Central Mechanical LAKSHIMPUR PWSS , SM/18457 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1, 2 & 3 at LAKSHIMPUR Water Supply Scheme [ Block- MONGALKOTE ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. Driller In-Charge Junior Engineer ORD/000801/2023-2024 4087/CMD 29/08/2023 640 ORIENTAL ENGINEERING CO. 44.40 0.00 0 31
2489 PURBA BARDHAMAN Mangolkote Burdwan Division LAKSHIMPUR PWSS , SM/18457 New Different works related (sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of different capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site) to SIMULIA & LAKSHIMPUR Piped Water Supply Scheme under Mongalkote Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer JUNIOR ENGINEER R.W.S. BURDWAN SUB-DIVISION PHE DTE ORD/000694/2023-2024 4363/BWD 04/10/2023 727 PUSPA ENTERPRISE 1,090.95 199.90 18.32 37
2490 PURBA BARDHAMAN Mangolkote Central Mechanical LAKSHIMPUR PWSS , SM/18457 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Lakshimpur & others water supply scheme under Mangalkote Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman Driller In-Charge Junior Engineer ORD/000097/2024-2025 2406/CMD 02/08/2024 290 CHOUDHURY ENTERPRISE 57.65 0.00 0 10
2491 PURBA BARDHAMAN Mangolkote Burdwan Division LAKSHIMPUR PWSS , SM/18457 New Different types of works involve in connection with implementation of Gohgram, Jabagram, Kherua, Lakshmipur & Simulia Piped Water Supply Scheme under Mongolkote Block within Katwa Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer ORD/001301/2024-2025 936/BWD 11/03/2025 180 M/S GHOSH CONSTRUCTION 360.68 0.00 0 0
2492 PURBA BARDHAMAN Katwa-II Burdwan Division KARUI PIPED WATER SUPPLY SCHEME , SM/18460 New Material Requisition To Resource Division RTOR000316/2023-2024 2197/BWD 12/05/2023 0 Resource Division 20.46 0.00 0 0
2493 PURBA BARDHAMAN Katwa-II Burdwan Division KARUI PIPED WATER SUPPLY SCHEME , SM/18460 New Material Requisition To Resource Division RTOR000556/2023-2024 4889/BWD 10/11/2023 0 Resource Division 75.91 0.00 0 0
2494 PURBA BARDHAMAN Katwa-II Burdwan Division KARUI PIPED WATER SUPPLY SCHEME , SM/18460 New Material Requisition To Resource Division RTOR000437/2023-2024 3850/BWD 01/09/2023 0 Resource Division 63.64 0.00 0 0
2495 PURBA BARDHAMAN Katwa-II Central Mechanical KARUI PIPED WATER SUPPLY SCHEME , SM/18460 New New service connection charges for Karui PWSS TW-2 BILL/00798/2023-2024 BP-2023-24-86 26/07/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 2.67 0.00 0 0
2496 PURBA BARDHAMAN Katwa-II Central Mechanical KARUI PIPED WATER SUPPLY SCHEME , SM/18460 New New service connection charges for Karui PWSS TW-3 BILL/01354/2023-2024 BP-2023-24-132 22/08/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 7.65 0.00 0 0
2497 PURBA BARDHAMAN Katwa-II Central Mechanical KARUI PIPED WATER SUPPLY SCHEME , SM/18460 New New service connection charges for Karui PWSS TW-1 BILL/00821/2023-2024 BP-2023-24-101 03/08/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.19 0.00 0 0
2498 PURBA BARDHAMAN Katwa-II Central Mechanical KARUI PIPED WATER SUPPLY SCHEME , SM/18460 New Continuation order for Hiring of Inspection Vehicle (Diesel/CNG/LPG Driven) for supervision of site for the office of The Driller In Charge, Bardhaman Mech, Sub Division ( Drilling) under C.M.D. P.H.E. Dte. w.e.f.-01/11/2023 to 31/12/2023. Driller In-Charge Junior Engineer ORD/001198/2023-2024 159/DIC/BMSD(D) 31/10/2023 61 SUBRATA BHADRA 0.79 0.64 81.01 100
2499 PURBA BARDHAMAN Katwa-II Central Mechanical KARUI PIPED WATER SUPPLY SCHEME , SM/18460 New Hiring of Inspection Vehicle (Diesel/CNG/LPG Driven) for supervision of site for the office of The Driller In Charge, Bardhaman Mech, Sub Division ( Drilling) under C.M.D. P.H.E. Dte. w.e.f.-01/09/2023 to 31/10/2023. Driller In-Charge Junior Engineer ORD/001162/2023-2024 70/DIC/BMSD(D) 28/08/2023 61 SUBRATA BHADRA 0.79 0.54 68.35 100
2500 PURBA BARDHAMAN Katwa-II Central Mechanical KARUI PIPED WATER SUPPLY SCHEME , SM/18460 New Continuation order for hiring of Inspection Vehicle ( Diesel/CNG/LPG Driven) for supervision of site for the office of the Driller In charge, Bardhaman Mechanical Sub Division(Drilling) under CMD, PHE, Dte, [w.e.f: 01.07.2024 to 31.08.2024] Driller In-Charge Junior Engineer ORD/000053/2024-2025 350/DIC/BMSD(D) 27/06/2024 62 SUBRATA BHADRA 0.79 0.75 94.94 0
2501 PURBA BARDHAMAN Katwa-II Central Mechanical KARUI PIPED WATER SUPPLY SCHEME , SM/18460 New Continuation order for hiring of Inspection Vehicle ( Diesel/CNG/LPG Driven) for supervision of site for the office of the Driller In charge, Bardhaman Mechanical Sub Division(Drilling) under CMD, PHE, Dte, [w.e.f.-01/05/2024 to 30/06/2024] Driller In-Charge Junior Engineer ORD/000002/2024-2025 259/DIC/BMSD(D) 26/04/2024 61 SUBRATA BHADRA 0.79 0.72 91.14 0
2502 PURBA BARDHAMAN Katwa-II Central Mechanical KARUI PIPED WATER SUPPLY SCHEME , SM/18460 New Continuation order for hiring of Inspection Vehicle ( Diesel/CNG/LPG Driven) for supervision of site for the office of the Driller In charge, Bardhaman Mechanical Sub Division(Drilling) under CMD, PHE, Dte, Dte. [w.e.f: 01.01.2024 to 29.02.2024] Driller In-Charge Junior Engineer ORD/001697/2023-2024 365/DIC/BMSD(D) 29/12/2023 60 SUBRATA BHADRA 0.78 0.64 82.05 100
2503 PURBA BARDHAMAN Katwa-II Central Mechanical KARUI PIPED WATER SUPPLY SCHEME , SM/18460 New Continuation order for hiring of Inspection Vehicle ( Diesel/CNG/LPG Driven) for supervision of site for the office of the Driller In charge, Bardhaman Mechanical Sub Division(Drilling) under CMD, PHE, Dte, [w.e.f: 01.03.2024 to 30.04.2024] Driller In-Charge Junior Engineer ORD/001726/2023-2024 141/DIC/BMSD(D) 29/02/2024 61 SUBRATA BHADRA 0.79 0.69 87.34 100
2504 PURBA BARDHAMAN Katwa-II Central Mechanical KARUI PIPED WATER SUPPLY SCHEME , SM/18460 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Mulgram & others water supply scheme under Katwa-II Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. ASSISTANT ENGINEER Junior Engineer ORD/000070/2024-2025 2409/CMD 02/08/2024 90 DUTTA ENTERPRISE 50.18 0.00 0 0
2505 PURBA BARDHAMAN Katwa-II Central Mechanical KARUI PIPED WATER SUPPLY SCHEME , SM/18460 New Supply and installation of Electro-Magnetic flow meter at AURIA, KARUI & others water supply scheme under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. Driller In-Charge JUNIOR ENGINEER ORD/000602/2024-2025 3106/CMD 11/12/2024 60 S.K. ELECTRICALS 13.60 0.00 0 0
2506 PURBA BARDHAMAN Katwa-II Burdwan Division KARUI PIPED WATER SUPPLY SCHEME , SM/18460 New Material Requisition To Resource Division RTOR000778/2023-2024 326/BWD 24/01/2024 0 Resource Division 8.78 0.00 0 0
2507 PURBA BARDHAMAN Katwa-II Burdwan Division KARUI PIPED WATER SUPPLY SCHEME , SM/18460 New Different works related (sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of different capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site) to MEJHIARY & KARUI Piped Water Supply Scheme under Katwa ¿ II Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer JUNIOR ENGINEER KATWA SUB-DIVISION PHE DTE ORD/000421/2023-2024 3291/BWD 31/07/2023 701 M/S S. CHOUDHURY 1,294.79 715.59 55.27 100
2508 PURBA BARDHAMAN Katwa-II Burdwan Division KARUI PIPED WATER SUPPLY SCHEME , SM/18460 New Construction of Toilet (1.8 m x 1.8 m) with sanitary arrangement under KARUI PWSS (SM/18460) 3rd Tube Well Site under Katwa Sub-Division under Burdwan Division PHE Dte. (Sl No-04) ORD/001265/2024-2025 345/KTS 05/03/2025 30 JAMALUDDIN SK 2.46 0.00 0 0
2509 PURBA BARDHAMAN Katwa-II Burdwan Division KARUI PIPED WATER SUPPLY SCHEME , SM/18460 New Construction of Toilet (1.8 m x 1.8 m) with sanitary arrangement under KARUI PWSS (SM/18460) 2nd Tube Well Site under Katwa Sub-Division under Burdwan Division PHE Dte. (Sl No-3) ORD/001264/2024-2025 344/KTS 05/03/2025 30 JAMALUDDIN SK 2.46 0.00 0 0
2510 PURBA BARDHAMAN Katwa-II Burdwan Division KARUI PIPED WATER SUPPLY SCHEME , SM/18460 New Different types of works involve in connection with implementation of Aug. Mongalkote, Palishgram, Purba Nowapara, Sitahati, Singhi, Mejhiary & Karui Piped Water Supply Scheme within Katwa Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer ORD/001191/2024-2025 873/BWD 06/03/2025 180 M/S S. CHOUDHURY 588.22 0.00 0 0
2511 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Kashipur Piped Water Supply Scheme at Bhatar Block , SM/07868 Retrofitting Extension of distribution main for providing FHTC at Kashipur Ramgere Adibasipara within Kashipur W/S Scheme in Bhatar Block under Burdwan Division, P.H.E. Dte. [Gr.-A] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000176/2021-2022 602/DSD 07/10/2021 30 THREE MAA ENTERPRISE 4.82 0.00 0 1
2512 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Kashipur Piped Water Supply Scheme at Bhatar Block , SM/07868 Retrofitting Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Sripur village (Sripur Habitation) of Kashipur piped water supply scheme within Durgapur Sub-Division under Burdwan Division, PHE Dte.(Tr No.-718/BWD/2020-21) Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000613/2020-2021 1439/BWD 18/02/2021 15 ROY BISWAS CONSTRUCTION 4.50 9.00 200 1
2513 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Kashipur Piped Water Supply Scheme at Bhatar Block , SM/07868 Retrofitting Continuation work order for Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Nurpur village and Nurpur Habitation of KASHIPUR piped water supply scheme within Durgapur Sub-Division (Bardhaman North) under Burdwan Division, PHE Dte. [Phase-I] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000659/2020-2021 3971/BWD 14/10/2020 30 THREE MAA ENTERPRISE 1.21 0.00 0 1
2514 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Kashipur Piped Water Supply Scheme at Bhatar Block , SM/07868 Retrofitting Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of Kashipur Piped Water Supply Scheme at Sripur, (Sripur Habitation), Kashipur (Part) (Kashipur & Sahabganj Part Habitation) Village (Mouza), Bhatar Block under Burdwan Division, PHE Dte. Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000003/2021-2022 3118/BWD 02/06/2021 30 PREMANANDA ROY BISWAS 35.02 59.31 169.36 1
2515 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Kashipur Piped Water Supply Scheme at Bhatar Block , SM/07868 Retrofitting Extension of distribution main for providing FHTC at Kashipur Ramgere Adibasipara within Kashipur W/S Scheme in Bhatar Block under Burdwan Division, P.H.E. Dte. [Gr.-A] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000182/2021-2022 619/DSD 25/10/2021 30 THREE MAA ENTERPRISE 4.82 4.82 100 1
2516 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Kashipur Piped Water Supply Scheme at Bhatar Block , SM/07868 Retrofitting Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Kashipur (Part) village (Kashipur habitation) of Kashipur Piped Water Supply Scheme within Durgapur Sub-Divn. under Burdwan Division, PHE. Dte. [SL. No. : 18] [Agr. No. 720/BWD of 2020-2021] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000375/2020-2021 1441/BWD 18/02/2021 15 PREMANANDA ROY BISWAS 4.48 0.44 9.82 1
2517 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Kashipur Piped Water Supply Scheme at Bhatar Block , SM/07868 Retrofitting Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Kashipur (Part) village (Sahebganj (P) habitation) of Kashipur Piped Water Supply Scheme within Durgapur Sub-Divn. under Burdwan Division, PHE. Dte. [SL. No. : 16] [Agree Ment No.719/BWD of 2020-21] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000368/2020-2021 1440/BWD 18/02/2021 15 THREE MAA ENTERPRISE 4.52 0.45 9.96 1
2518 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Kashipur Piped Water Supply Scheme at Bhatar Block , SM/07868 Retrofitting Providing leftout water tap connection in different villages for 100% coverage to make it Sajal Gram from existing distribution system within scheme jurisdiction of different Piped Water Supply Schemes within Bhatar Block under Burdwan Division, PHE. Dte. Assistant Engineer ,Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000389/2021-2022 268/BWD 14/01/2022 30 BHARAT CONSTRUCTION 14.17 4.11 29 1
2519 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Kashipur Piped Water Supply Scheme at Bhatar Block , SM/07868 Retrofitting Restoration of damaged pipeline during construction of drain, concrete road etc and making valve chamber at various point at Kashipur village within Kashipur W/S Scheme in Bhatar Block under Burdwan Division, P.H.E. Dte. [SL-14] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer2, Durgapur Sub-Division, PHE Dte. ORD/000886/2022-2023 739/DSD 30/12/2022 21 PAPRI HAZRA 0.87 0.86 98.85 100
2520 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Kashipur Piped Water Supply Scheme at Bhatar Block , SM/07868 Retrofitting Providing Functional Household Tap Connection (FHTC)from distribution system within the command area of Kashipur water supply scheme at Kashipur Nurpur and Sahebganj village to make its Swajalgram under JAL JIBAN MISSION within Bhatar Block in Purba Bardhanan District undrer Burdwan Division, P.H.E. Dte. Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer2, Durgapur Sub-Division, PHE Dte. ORD/000398/2024-2025 623/DSD 05/08/2024 90 RAM MOHAN MUKHERJEE 3.15 0.00 0 0
2521 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Kashipur Piped Water Supply Scheme at Bhatar Block , SM/07868 Retrofitting Continuation work order for Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Kashipur village in Sahebganj habitation of Kashipur piped water supply scheme within Durgapur (Bardhaman North) Sub-Division under Burdwan Division, PHE Dte. [Phase-I](Tr No.-361/BWD/2020-21) AE(HQs) J.E. 2 BURDWAN ORD/000266/2020-2021 3973/BWD 14/10/2020 30 PREMANANDA ROY BISWAS 4.84 1.20 24.79 0
2522 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Kashipur Piped Water Supply Scheme at Bhatar Block , SM/07868 Retrofitting Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Nurpur village and Nurpur habitation of Kashipur piped water supply scheme within Durgapur (Bardhaman North) Sub-Division under Burdwan Division, PHE Dte. [Phase-I](Tr No.-359/BWD/2020-21) Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer2, Durgapur Sub-Division, PHE Dte. ORD/000267/2020-2021 3340/BWD 18/09/2020 30 THREE MAA ENTERPRISE 4.84 1.20 24.79 0
2523 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Kashipur Piped Water Supply Scheme at Bhatar Block , SM/07868 Retrofitting Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Kashipur village and Sahebganj habitation of Kashipur piped water supply scheme within Durgapur (Bardhaman North) Sub-Division under Burdwan Division, PHE Dte. [Phase-I](Tr No.-360/BWD/2020-21) Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer ORD/000312/2020-2021 3339/BWD 18/09/2020 30 PREMANANDA ROY BISWAS 4.84 1.20 24.79 0
2524 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Kashipur Piped Water Supply Scheme at Bhatar Block , SM/07868 Retrofitting Relaying and restoration of damaged pipeline of distribution main for widening of PWD road and Bridge at Sahebganj Bazar for providing FHTC within Kashipur W/S Scheme in Bhatar Block under Burdwan Division, P.H.E. Dte. Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer2, Durgapur Sub-Division, PHE Dte. ORD/000564/2023-2024 653/DSD 24/08/2023 30 ANWESHA CONSTRUCTION 0.95 0.95 100 100
2525 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Kashipur Piped Water Supply Scheme at Bhatar Block , SM/07868 Retrofitting Restoration of damaged pipeline of distribution main for construction of drain, concrete road etc at various point at Majhipara village for providing FHTC within Kashipur W/S Scheme in Bhatar Block under Burdwan Division, P.H.E. Dte. Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer2, Durgapur Sub-Division, PHE Dte. ORD/000563/2023-2024 652/DSD 24/08/2023 30 ANWESHA CONSTRUCTION 0.96 0.96 100 100
2526 PURBA BARDHAMAN Burdwan-II Burdwan Division Ichalabad Piped Water Supply Scheme , SM/18404 New Material Requisition To Resource Division RTOR000281/2023-2024 2197/BWD 12/05/2023 0 Resource Division 8.88 0.00 0 0
2527 PURBA BARDHAMAN Burdwan-II Burdwan Division Ichalabad Piped Water Supply Scheme , SM/18404 New Material Requisition To Resource Division RTOR000439/2023-2024 3848/BWD 01/09/2023 0 Resource Division 15.12 0.00 0 0
2528 PURBA BARDHAMAN Burdwan-II Burdwan Division Ichalabad Piped Water Supply Scheme , SM/18404 New Material Requisition To Resource Division RTOR000672/2023-2024 5062/BWD 23/11/2023 0 Resource Division 20.46 0.00 0 0
2529 PURBA BARDHAMAN Burdwan-II Central Mechanical Ichalabad Piped Water Supply Scheme , SM/18404 New Quotation for new service connection for Ichalabad PWSS PH 1. BILL/00230/2024-2025 BP-2024-25-121 29/05/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 36.60 0.00 0 0
2530 PURBA BARDHAMAN Burdwan-II Burdwan Division Ichalabad Piped Water Supply Scheme , SM/18404 New Different works related (sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of different capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site) to ICHALABAD & HATSIMUL Piped Water Supply Scheme under Burdwan ¿ II Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. Junior Engineer, Burdwan Sadar Sub-Division ORD/000423/2023-2024 3292/BWD 31/07/2023 885 M/S NATIONAL CONSTRUCTION 1,617.18 0.00 0 60
2531 PURBA BARDHAMAN Burdwan-II Central Mechanical Ichalabad Piped Water Supply Scheme , SM/18404 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at Ichalabad Water Supply Scheme [ Block- Burdwan-2 ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER Junior Engineer ORD/000906/2023-2024 4170/CMD 29/08/2023 30 J.S. CONSTRUCTION. 29.71 0.00 0 50
2532 PURBA BARDHAMAN Burdwan-II Central Mechanical Ichalabad Piped Water Supply Scheme , SM/18404 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at KUSHA & others water supply scheme under Bardhaman-II Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman ASSISTANT ENGINEER Junior Engineer ORD/000065/2024-2025 2389/CMD 02/08/2024 90 DILIP MAHATO 53.14 0.00 0 12
2533 PURBA BARDHAMAN Burdwan Division Rretrofitting wroks for Providing Functional Household Tap Connection (FHTC) within the commend area of RASULPUR Piped Water Supply Scheme , SM/08031 Retrofitting Providing FHTC from dist. System within the command area of RASULPUR Piped Water Supply Scheme at Genraghata, Paschim Tazpur, Ulara, Daluibazar of Daluibazar - I G.P. and different samsad such as Samsad No. 05, 13, 08, 12, 09, 10, 11, 15 & 14 within Nimo-I G.P. at Memari-I Development Block under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000612/2021-2022 1572/BWD 16/03/2022 60 SUJAY KUMAR RAY 55.17 41.89 75.93 1
2534 PURBA BARDHAMAN Burdwan Division Rretrofitting wroks for Providing Functional Household Tap Connection (FHTC) within the commend area of RASULPUR Piped Water Supply Scheme , SM/08031 Retrofitting Emergency repair and provide 5 (5 nos 100 dia. S.V) No's Sluice Valve at Chaknara & Ullara village under Rasulpur piped water supply scheme (Retro Fittings) for smooth drinking water supply within Memari-I Block under Burdwan Division, PHE Dte (Part-B). Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. Junior Engineer, RWS, Memari-I Dev. Bolck ORD/000578/2022-2023 1972/BSD 16/11/2022 15 SUPRIYA RAY 0.90 0.00 0 0
2535 PURBA BARDHAMAN Burdwan Division Rretrofitting wroks for Providing Functional Household Tap Connection (FHTC) within the commend area of RASULPUR Piped Water Supply Scheme , SM/08031 Retrofitting Construction of Balance portion of Boundary wall at Head Works Site of RASULPUR Water Supply scheme under MEMARI-I Block of Burdwan Division, PHE Dte. (Length -15.00 Mtr, Col-7 Nos). Gr.E. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000443/2022-2023 1481/BSD 25/08/2022 30 DEBASHISH ENTERPRISE 1.95 1.51 77.44 100
2536 PURBA BARDHAMAN Burdwan Division Rretrofitting wroks for Providing Functional Household Tap Connection (FHTC) within the commend area of RASULPUR Piped Water Supply Scheme , SM/08031 Retrofitting Material Requisition To Resource Division RTOR000021/2021-2022 425/BWD 20/01/2022 0 Resource Division 5.50 0.00 0 0
2537 PURBA BARDHAMAN Burdwan Division Rretrofitting wroks for Providing Functional Household Tap Connection (FHTC) within the commend area of RASULPUR Piped Water Supply Scheme , SM/08031 Retrofitting Emergency repair and provided (4 nos.100 dia S.V) No's Sluice Valve at Rasulpur Natun Rasta,Nichu Bazar of RASULPUR Piped Water Supply Scheme (Retrofittings) for smooth drinking water supply within within Memari-I Block under Burdwan Division, PHE Dte. Gr.D Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000564/2022-2023 1920/BSD 11/11/2022 15 SUPRIYA RAY 0.73 0.00 0 100
2538 PURBA BARDHAMAN Burdwan Division Rretrofitting wroks for Providing Functional Household Tap Connection (FHTC) within the commend area of RASULPUR Piped Water Supply Scheme , SM/08031 Retrofitting Formal Work Order for Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of Rasulpur Piped Water Supply Scheme at Chaknara, Rasulpur (4 Nos Habitation Part) Daluibazar (Part) Village (Mouza), Memari-I Block under Burdwan Division, PHE Dte..[Agreement No. 103/SE/CC/PHE/Dte of 2020-2021.] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000600/2020-2021 997/BWD 04/02/2021 60 MITRA CONSTRUCTION 95.96 189.33 197.3 0
2539 PURBA BARDHAMAN Burdwan Division Rretrofitting wroks for Providing Functional Household Tap Connection (FHTC) within the commend area of RASULPUR Piped Water Supply Scheme , SM/08031 Retrofitting Formal Work Order for Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of Rasulpur Piped Water Supply Scheme at Jitkanu, Genraghata, Paschim Tazpur, Ulara (2 Nos Habitation) & Baidyadanga Village (Mouza), Memari-I Block under Burdwan Division, PHE Dte.(Agreement No. 104/SE/CC/PHE/DTE of 2020-2021) Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000578/2020-2021 996/BWD 04/02/2021 60 MITRA CONSTRUCTION 93.49 188.21 201.32 0
2540 PURBA BARDHAMAN Burdwan Division Rretrofitting wroks for Providing Functional Household Tap Connection (FHTC) within the commend area of RASULPUR Piped Water Supply Scheme , SM/08031 Retrofitting Restoration of damaged portion of 75 mm dia & 125 mm dia UPVC pipeline due to widening of GT Road by from Palla Road more to Mahamaya Store at RASULPUR water supply scheme within Burdwan Sub-Division under Burdwan Division, PHE Dte. [Gr.-C] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000783/2020-2021 19/BSD 06/01/2021 30 PAL CONSTRUCTION 4.79 4.25 88.73 0
2541 PURBA BARDHAMAN Burdwan Division Rretrofitting wroks for Providing Functional Household Tap Connection (FHTC) within the commend area of RASULPUR Piped Water Supply Scheme , SM/08031 Retrofitting Restoration of concrete road by Cement concrete (mix 1:1.5:3), Providing balance FHTC, parallel pipeline, drainage system, boundary wall, Bridge, land development, Sluice valve chamber for smooth water supply of FHTC work for RASULPUR PWSS and its adjoining mouzas within MEMARI-I BLOCK under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000982/2024-2025 4474/BWD 19/12/2024 90 SARKAR AGENCY 91.74 0.00 0 51
2542 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) retrofitting in the command area of of Rayan Piped Water Supply Scheme , SM/08102 Retrofitting Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of Rayan Piped Water Supply Scheme at Rayan (Part) (Baisnabpara, Bayanpara, Bhotargra, Bhtarpur, DVC Canal, Dakhinpara, Dangapara, Daspara, Dulapara, Durgamandir, Ghatimgore, Gopaldighi & Hatu Dewan (N)) Village (Mouza), Bardhaman-I Block under Burdwan Division, PHE Dte.._2ND CALL. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000099/2021-2022 3202/BWD 09/06/2021 60 SUNNY ELECTRIC CO. 53.10 51.27 96.55 1
2543 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) retrofitting in the command area of of Rayan Piped Water Supply Scheme , SM/08102 Retrofitting Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of Rayan Piped Water Supply Scheme at Rayan (Part) (Hatu Dewan(S), Kantai Krishnapur, Katwa Road, KhanPukur, Krishnapur, MadanSayar, Makumpara, Malikpara, Malir Bagan, Muchipara, Muslimpara & Narupara) Village (Mouza), Bardhaman-I Block under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000191/2021-2022 3143/BWD 04/06/2021 45 S.R. ENTERPRISE 49.27 47.96 97.34 1
2544 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) retrofitting in the command area of of Rayan Piped Water Supply Scheme , SM/08102 Retrofitting Extension of upvc distribution pipe line, s/valve chamber & conc. Work (Habitation-Belbagan,sutradharpara, Khanpukur & Adibasipara under Nari village) in regarding FHTC for Rayan water supply scheme at Bardhhaman-I Development Block under Burdwan Division, PHE Dte.Gr.B. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000401/2021-2022 70/BSD 14/01/2022 30 BRINDABAN KONAR 4.64 4.32 93.1 1
2545 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) retrofitting in the command area of of Rayan Piped Water Supply Scheme , SM/08102 Retrofitting Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of RAYAN Piped Water Supply Scheme at Narayandighi & Sadhanpur (Part) Village (Mouza), Burdwan - I Block under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000340/2021-2022 27/BWD 04/01/2022 30 DUBE ENTERPRISE 30.24 30.23 99.97 1
2546 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) retrofitting in the command area of of Rayan Piped Water Supply Scheme , SM/08102 Retrofitting Laying of interconnection between tube well No 1 to 6 & OHR and OHR to distribution system for RAYAN & Its Adjoing Mouzas Water Supply Scheme within Bardhaman I Dev. Block , under Burdwan Division, PHE Dte.Gr.C. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000402/2021-2022 71/BSD 14/01/2022 30 BRINDABAN KONAR 4.81 0.00 0 1
2547 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) retrofitting in the command area of of Rayan Piped Water Supply Scheme , SM/08102 Retrofitting Providing FHTC of distribution pipe line at Nari village(Habitation-Sutradharpara,Adibasipara & Suriyapally)for RAYAN Water Supply Scheme at Bardhhaman-I Development Block under Burdwan Division,PHE Dte.Gr.A Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000030/2022-2023 677/BSD 22/04/2022 30 BRINDABAN KONAR 2.68 2.68 100 1
2548 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) retrofitting in the command area of of Rayan Piped Water Supply Scheme , SM/08102 Retrofitting Extension of UPVC distribution pipeline sluice valve chamber & concrete work in regarding FHTC for Rayan water supply scheme of Bardhaman-I Development Block under Burdwan Division, PHE Dte.[Gr.-E] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000767/2021-2022 1428/BSD 28/10/2021 30 S.R. ENTERPRISE 4.01 4.00 99.75 1
2549 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) retrofitting in the command area of of Rayan Piped Water Supply Scheme , SM/08102 Retrofitting Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of RAYAN Piped Water Supply Scheme at Naridaspara and balance portion of Sukantapally, Suryapally, Nari Purbapara & Nasakali (Nari Mouza), Burdwan - I Block under Burdwan Division, PHE. Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000080/2022-2023 2558/BWD 19/05/2022 30 SARKAR AGENCY 41.42 41.57 100.36 1
2550 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) retrofitting in the command area of of Rayan Piped Water Supply Scheme , SM/08102 Retrofitting Road restoration work due to FHTC & extension pipeline for different village (Rayan, Naryandighi, Nari Das Para, Krishnapur, Nari & Sukantapally) under RAYAN Piped W/S. Scheme at Burdwan - I Dev. Block under Burdwan Division, PHE. Dte. ORD/000593/2023-2024 3771/BWD 29/08/2023 30 DURGAPADA MONDAL 5.97 5.92 99.16 100
2551 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) retrofitting in the command area of of Rayan Piped Water Supply Scheme , SM/08102 Retrofitting Material Requisition To Resource Division RTOR000001/2024-2025 4103/BWD 25/11/2024 0 Resource Division 54.42 0.00 0 0
2552 PURBA BARDHAMAN Burdwan Division Providing Functional House Hold Tap Connection (FHTC) by retrofitting within the command area of Ekaihat Piped Water Supply Scheme , SM/07203 Retrofitting Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Akaihat village of Ekaihat piped water supply scheme within Katwa Sub-Division under Burdwan Division, PHE Dte. [Phase-I](Tr No.-196/BWD/2020-21) Assistant Engineer ORD/000107/2020-2021 2597/BWD 04/08/2020 30 JAI MAA DURGA & CO. 4.92 9.84 200 1
2553 PURBA BARDHAMAN Burdwan Division Providing Functional House Hold Tap Connection (FHTC) by retrofitting within the command area of Ekaihat Piped Water Supply Scheme , SM/07203 Retrofitting Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Bikaihat & Akaihat village of Ekaihat piped water supply scheme within Katwa Sub-Division under Burdwan Division, PHE Dte. [Phase-I](Tr No.-169/BWD/2020-21) Assistant Engineer ORD/000106/2020-2021 2598/BWD 04/08/2020 30 JAGADANANDAPUR CO. OP. LABOUR CONTRACT AND CONSTRUCTION SOCIETY LTD. 4.92 9.84 200 1
2554 PURBA BARDHAMAN Burdwan Division Providing Functional House Hold Tap Connection (FHTC) by retrofitting within the command area of Ekaihat Piped Water Supply Scheme , SM/07203 Retrofitting Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Ekaihat & Bikaihat (Pt-A) village of Ekaihat piped water supply scheme within Katwa Sub-Division under Burdwan Division, PHE Dte. [Phase-I](Tr No.-486/BWD/2020-21) Assistant Engineer ORD/000265/2020-2021 236/KTS 30/09/2020 4 JAI MAA DURGA & CO. 1.29 2.55 197.67 1
2555 PURBA BARDHAMAN Burdwan Division Providing Functional House Hold Tap Connection (FHTC) by retrofitting within the command area of Ekaihat Piped Water Supply Scheme , SM/07203 Retrofitting Continuation work order for Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Ekaihat village of Ekaihat piped water supply scheme within Katwa Sub-Division under Burdwan Division, PHE Dte. [Phase-I](Tr No.-329/BWD/2020-21) Assistant Engineer ORD/000261/2020-2021 3739/BWD 07/10/2020 30 JAI MAA DURGA & CO. 1.74 3.47 199.43 1
2556 PURBA BARDHAMAN Burdwan Division Providing Functional House Hold Tap Connection (FHTC) by retrofitting within the command area of Ekaihat Piped Water Supply Scheme , SM/07203 Retrofitting Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Ekaihat & Bikaihat (Part-B) village of Ekaihat & Bikaihat piped water supply scheme within Katwa Sub-Division under Burdwan Division, PHE Dte. (Tr No.-539/BWD/2020-21) Assistant Engineer ORD/000357/2020-2021 237/KTS 30/09/2020 4 JAGADANANDAPUR CO. OP. LABOUR CONTRACT AND CONSTRUCTION SOCIETY LTD. 1.32 2.65 200.76 1
2557 PURBA BARDHAMAN Burdwan Division Providing Functional House Hold Tap Connection (FHTC) by retrofitting within the command area of Ekaihat Piped Water Supply Scheme , SM/07203 Retrofitting Continuation work order for Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Bikaihat & Ekaihat village of Ekaihat piped water supply scheme within Katwa Sub-Division under Burdwan Division, PHE Dte. [Phase-I](Tr No.-538/BWD/2020-21) Assistant Engineer ORD/000474/2020-2021 3697/BWD 05/10/2020 30 JAGADANANDAPUR CO. OP. LABOUR CONTRACT AND CONSTRUCTION SOCIETY LTD. 1.79 3.59 200.56 1
2558 PURBA BARDHAMAN Burdwan Division Providing Functional House Hold Tap Connection (FHTC) by retrofitting within the command area of Ekaihat Piped Water Supply Scheme , SM/07203 Retrofitting Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Ekaihat & Bikaihat village of Ekaihat piped water supply scheme within Katwa Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer ORD/000625/2020-2021 364/KTS 15/12/2020 7 BISHWAJIT DAS 1.18 2.35 199.15 1
2559 PURBA BARDHAMAN Burdwan Division Providing Functional House Hold Tap Connection (FHTC) by retrofitting within the command area of Ekaihat Piped Water Supply Scheme , SM/07203 Retrofitting Providing Functional Household Tap Connection from existing distribution system within the command area of Akaihat and Bikihat PWSS under Katwa Sub-Division under Burdwan Division PHE Dte. (Sl No-1) Assistant Engineer ORD/000238/2021-2022 750/KTS 24/11/2021 15 JAI MAA DURGA & CO. 2.54 2.52 99.21 1
2560 PURBA BARDHAMAN Burdwan Division Providing Functional House Hold Tap Connection (FHTC) by retrofitting within the command area of Ekaihat Piped Water Supply Scheme , SM/07203 Retrofitting Continuation work order for supply of 10 mm NB Gun-Metal /Brass Ferrul conforming to IS:2692-1989 for water tap connection in each household from existing distribution system within scheme jurisdiction in different piped water supply scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. and delivered at Barsul Divisional Store.[Part-6] Assistant Engineer ORD/000867/2020-2021 4318/BWD 04/11/2020 10 MD HASIN 4.93 0.61 12.37 1
2561 PURBA BARDHAMAN Burdwan Division Providing Functional House Hold Tap Connection (FHTC) by retrofitting within the command area of Ekaihat Piped Water Supply Scheme , SM/07203 Retrofitting Detail route survey, design of distribution network and preparation of estimate, drawing & DPR for providing FHTC in the scheme EKAIHAT, PANUHAT PWSS (Sl No-2) Assistant Engineer JUNIOR ENGINEER KATWA SUB-DIVISION PHE DTE ORD/000070/2023-2024 394/KTS 13/04/2023 30 SIRCON ENGINEERING SERVICES 2.48 1.24 50 100
2562 PURBA BARDHAMAN Burdwan Division Providing Functional House Hold Tap Connection (FHTC) by retrofitting within the command area of Ekaihat Piped Water Supply Scheme , SM/07203 Retrofitting Vehicle bill [Car No.-WB-04G-6018] for the month of September & October'2023. BILL/02056/2023-2024 1269/JJM 16/01/2024 0 M/S MUNMUN DEY 0.49 0.00 0 0
2563 PURBA BARDHAMAN Burdwan Division Providing Functional House Hold Tap Connection (FHTC) by retrofitting within the command area of Ekaihat Piped Water Supply Scheme , SM/07203 Retrofitting Vehicle bill [Car No.-WB-04G-6018] for the month of November & December'2023. BILL/02053/2023-2024 1894/JJM 28/03/2024 0 M/S MUNMUN DEY 0.45 0.00 0 0
2564 PURBA BARDHAMAN Burdwan Division Providing Functional House Hold Tap Connection (FHTC) by retrofitting within the command area of Ekaihat Piped Water Supply Scheme , SM/07203 Retrofitting Necessary FHTC work of Ekaihat PWSS under Katwa Sub-Division Block Katwa-I Burdwan Division PHE Dte. (Sl No -5) Assistant Engineer Junior Engineer, R.W.S., Katwa-I Dev. Block ORD/001052/2024-2025 1609/KTS 14/11/2024 45 HAMID SK 0.95 0.00 0 90
2565 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Chhotobainan Piped Water Supply Scheme , SM/06968 Retrofitting Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Momrejpur village of Chhotobainan piped water supply scheme within Burdwan Sub-Division under Burdwan Division, PHE Dte. [Phase-I](Tr No.-174/BWD/2020-21) ORD/000119/2020-2021 2741/BWD 10/08/2020 30 TIRUPATI ENTERPRISES 4.92 9.84 200 1
2566 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Chhotobainan Piped Water Supply Scheme , SM/06968 Retrofitting Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of Chhotobainan Piped Water Supply Scheme at Chhotobainan (3 Nos Part Habitation), Akhina, Dakhin Mohanour, Pahalanpur & Rupsara Village (Mouza), Raina-II Block under Burdwan Division, PHE Dte.(Agreement No. 62/2020-2021 OF SE/CC/PHE. DTE.) Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000127/2020-2021 4852/BWD 04/12/2020 90 TIRUPATI ENTERPRISES 100.40 164.88 164.22 1
2567 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Chhotobainan Piped Water Supply Scheme , SM/06968 Retrofitting Extension of pipeline for CHHOTOBAINAN water supply scheme at Pahalanpur and Rupsara and Dakshin Mohonpur village within Raina-II Block under Burdwan Division, PHE Dte. [Gr.-E] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000212/2021-2022 988/BSD 30/07/2021 30 TIRUPATI ENTERPRISES 4.82 6.70 139 1
2568 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Chhotobainan Piped Water Supply Scheme , SM/06968 Retrofitting Supply of materials for different water supply scheme under Burdwan Division, PHE Dte. VCH/001246/2021-2022 900/DW 03/02/2022 0 EXECUTIVE ENGINEER, RESOURCES DIVISION, P.H.E. DTE. 34.54 0.00 0 0
2569 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Chhotobainan Piped Water Supply Scheme , SM/06968 Retrofitting Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Chhotobainan village of Chhotobainan piped water supply scheme within Burdwan Sub-Division under Burdwan Division, PHE Dte. [Phase-I](Tr No.-173/BWD/2020-21) ORD/000118/2020-2021 2740/BWD 10/08/2020 30 BOSE ENTERPRISE 4.90 9.80 200 1
2570 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Chhotobainan Piped Water Supply Scheme , SM/06968 Retrofitting Extension of pipeline for CHHOTOBAINAN water supply scheme at Chhotobainan village within Raina-II Block under Burdwan Division, PHE Dte. (Gr.-D) Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000208/2021-2022 956/BSD 23/07/2021 30 BOSE ENTERPRISE 4.92 8.55 173.78 0
2571 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting at Bundebaj PWSS , SM/06753 Retrofitting Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Bundebaj (Pt-B) village of Bundebaj Piped Water Supply Scheme within Kalna Sub-Divn. under Burdwan Division, PHE. Dte. [Phase - I] [Sl.No : 8B] (T.R. no. 377/BWD/2020-21) Assistant Engineer ORD/000138/2020-2021 2591/BWD 04/08/2020 30 MAA LAXMI ENTERPRISE 4.92 9.84 200 1
2572 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting at Bundebaj PWSS , SM/06753 Retrofitting Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Bundebaj (Pt-A) village of Bundebaj Piped Water Supply Scheme within Kalna Sub-Divn. under Burdwan Division, PHE. Dte. [Phase - I] [Sl.No : 8A] (T.R. No. 320/BWD/2020-21) Assistant Engineer ORD/000137/2020-2021 2586/BWD 04/08/2020 30 MOMINUL ISLAM MONDAL 4.92 9.84 200 1
2573 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting at Bundebaj PWSS , SM/06753 Retrofitting Continuation work order for supply of 10 mm NB Gun-Metal /Brass Ferrul conforming to IS:2692-1989 for water tap connection in each household from existing distribution system within scheme jurisdiction in different piped water supply scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. and delivered at Barsul Divisional Store.[Part-6] Assistant Engineer ORD/000867/2020-2021 4318/BWD 04/11/2020 10 MD HASIN 4.93 0.32 6.49 1
2574 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting at Bundebaj PWSS , SM/06753 Retrofitting Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Bohar village and Minapur & Khortikpara habitation of SATGACHIA piped water supply scheme within Burdwan Sub-Division under Burdwan Division, PHE Dte.[Phase-I][Gr.-4A] ORD/000739/2020-2021 3326/BWD 18/09/2020 30 SUBRATA GUPTA 4.87 9.67 198.56 0
2575 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Keunta Piped Water Supply Scheme , SM/07820 Retrofitting Providing Functional Household Tap Connection (FHTC) at Nandanpur and Rampur village within the command area of Keunta Piped Water Supply Scheme at Raina-II Block under Burdwan Division, PHE Dte. [Group : D] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000461/2021-2022 69/AE/HQ 11/02/2022 30 SUPER SKILL 4.16 3.85 92.55 1
2576 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Keunta Piped Water Supply Scheme , SM/07820 Retrofitting Supply of materials for different water supply scheme under Burdwan Division, PHE Dte. VCH/001013/2021-2022 21/01/2022 0 EXECUTIVE ENGINEER, RESOURCES DIVISION, P.H.E. DTE. 617.98 0.00 0 0
2577 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Keunta Piped Water Supply Scheme , SM/07820 Retrofitting Payment for supply of materials for different water supply scheme under Burdwan Division, PHE Dte. VCH/001045/2021-2022 934/DW 31/01/2022 0 EXECUTIVE ENGINEER, RESOURCES DIVISION, P.H.E. DTE. 617.98 0.00 0 0
2578 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Keunta Piped Water Supply Scheme , SM/07820 Retrofitting Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of KEUNTA Piped Water Supply Scheme at Kalui, Keunta, Kulpukur, Rathtala, Mandarpur, Rampur & Nandanpur habitation, Raina - I Block under Burdwan Division, PHE Dte. (Agreement No. 57/2020-2021 OF SE/CC/PHE. DTE.) Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000443/2020-2021 4853/BWD 04/12/2020 90 SUPER SKILL 95.71 49.10 51.3 1
2579 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Keunta Piped Water Supply Scheme , SM/07820 Retrofitting Providing leftout water tap connection in different villages for 100% coverage to make it Sajal Gram from existing distribution system within scheme jurisdiction of different Piped Water Supply Schemes within Raina ¿ II Block under Burdwan Division, PHE. Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000390/2021-2022 269/BWD 14/01/2022 30 PRONAB KUMAR DEY 6.99 3.32 47.5 1
2580 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Keunta Piped Water Supply Scheme , SM/07820 Retrofitting Repairing of damage concrete work due to laying of pipeline at Keunta within Keunta water supply scheme under Burdwan Division, PHE Dte. [Gr.-G] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000556/2021-2022 1895/AE/HQ 16/11/2021 30 DUBE ENTERPRISE 2.39 2.27 94.98 1
2581 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Keunta Piped Water Supply Scheme , SM/07820 Retrofitting Realignment and culvert crossing of D.I. pipeline at damaged section and repairing of uPVC pipeline at Nandanpur, Keunta and Rampur village within Keunta Piped Water Supply Scheme, Raina ¿ II Block under Burdwan Division, PHE. Dte. [Group : D] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000043/2022-2023 236/AE/HQ 19/04/2022 30 SUPER SKILL 4.61 3.15 68.33 1
2582 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Keunta Piped Water Supply Scheme , SM/07820 Retrofitting Extension of pipe line for providing Functional Household Tap Connection (FHTC) and construction of sluice valve chamber within the command area of KEUNTA Piped Water Supply scheme, Raina-II Block under Burdwan Division, PHE Dte._Gr-H Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000663/2021-2022 138/AE/HQ 15/03/2022 20 SUPER SKILL 4.81 3.63 75.47 1
2583 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Keunta Piped Water Supply Scheme , SM/07820 Retrofitting Pipeline with FHTC for KEUNTA Water Supply Scheme at Kalui village (30 Nos.), Keunta village (30 Nos.), Mandarpur village (30 Nos.), Rampur village (30 Nos.), Nandanpur village (60 Nos.), within Raina-II Block, under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000712/2022-2023 855/BWD 28/02/2023 45 DUBE ENTERPRISE 60.10 49.88 83 100
2584 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Keunta Piped Water Supply Scheme , SM/07820 Retrofitting Material Requisition To Resource Division RTOR000005/2021-2022 3692/BWD 16/07/2021 0 Resource Division 12.43 0.00 0 0
2585 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Keunta Piped Water Supply Scheme , SM/07820 Retrofitting Hire & fuel charges of vehicle Car No.-WB-41J-6795 for the month of June & July2023. BILL/01035/2023-2024 745/JJM 11/10/2023 0 MD HASIN 0.79 0.00 0 0
2586 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Keunta Piped Water Supply Scheme , SM/07820 Retrofitting Vehicle bill for the office of the Assistant Engineer, Burdwan Division, PHE Dte. for the month of July'23. BILL/00613/2023-2024 560/JJM 24/08/2023 0 SK.ASFIA 0.40 0.00 0 0
2587 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of MAHESHDANGA Piped Water Supply Scheme at Memari-I Block , SM/07855 Retrofitting Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of Maheshdanga Piped Water Supply Scheme at Maheshdanga Village (5 Nos. habitations) & Kathalgachhi Village (3 Nos. habitations), Memari ¿ I Block under Burdwan Division, PHE Dte.(Agreement No. 722/BWD of 2020-2021) Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000324/2020-2021 1687/BWD 24/02/2021 60 PABITRA KUMAR SAMANTA 54.78 108.93 198.85 1
2588 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of MAHESHDANGA Piped Water Supply Scheme at Memari-I Block , SM/07855 Retrofitting Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of Maheshdanga Piped Water Supply Scheme at Salda Village (2 Nos. habitations) & Bahara Village (5 Nos. habitations), Jamalpur Block under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000156/2021-2022 4634/BWD 09/09/2021 60 CREATION CONSTRUCTION 52.73 52.53 99.62 1
2589 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of MAHESHDANGA Piped Water Supply Scheme at Memari-I Block , SM/07855 Retrofitting Supply of materials for different water supply schemes under Burdwan Division, PHE Dte. VCH/001555/2021-2022 1194/DW 10/03/2022 0 EXECUTIVE ENGINEER, RESOURCES DIVISION, P.H.E. DTE. 62.76 0.00 0 0
2590 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of MAHESHDANGA Piped Water Supply Scheme at Memari-I Block , SM/07855 Retrofitting Providing FHTC from dist. System within the command area of MAHESDANGA Piped Water Supply Scheme at Deule Village, Salda Village, Bhara Village, Kathalgachi Village & Koleypara Village at Memari-I Development Block under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000613/2021-2022 1573/BWD 16/03/2022 60 SUPRIYA RAY 70.50 14.96 21.22 0
2591 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of MAHESHDANGA Piped Water Supply Scheme at Memari-I Block , SM/07855 Retrofitting Canal crossing of Mahesdanga water supply scheme(Node point 192 to 193) under Memari-I Block under Burdwan Division, PHE Dte.[Gr.-D] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000313/2021-2022 1158/BSD 31/08/2021 30 RANADHIR SINHA 4.85 0.00 0 1
2592 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of MAHESHDANGA Piped Water Supply Scheme at Memari-I Block , SM/07855 Retrofitting Construction of boundary wall (North side) including Front Gate at Pump house no - I Site of Maheshdanga Water Supply Scheme under Memari-I Dev. Block of Burdwan Division, PHE Dte. (Length -55.00 Mtr, Col-20 Nos). Gr.D. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000647/2021-2022 469/BSD 21/03/2022 45 SK ABDUL HALIM 4.37 0.00 0 1
2593 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of MAHESHDANGA Piped Water Supply Scheme at Memari-I Block , SM/07855 Retrofitting Providing FHTC from dist. System within the command area of MAHESDANGA Piped Water Supply Scheme at Bahera (Part) and Mahesdanga (Part) Village (Mahesdanga, Aymadeulepara, Kamarpara & Jangalpara Habs.) at Memari-I Development Block under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000611/2021-2022 1571/BWD 16/03/2022 30 SUPRIYA RAY 22.42 22.40 99.91 1
2594 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of MAHESHDANGA Piped Water Supply Scheme at Memari-I Block , SM/07855 Retrofitting Laying of 200 mm dia HDPE distribution pipe line (Node No-402 To 401B) for Mahesdanga & ADJOINING MOUZAS WATER SUPPLY SCHEME at Memari-I Development Block under Burdwan Division, PHE Dte. Group : C Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000082/2022-2023 816/BSD 20/05/2022 30 M/S ASHA CONSTRUCTION 4.79 0.00 0 1
2595 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of MAHESHDANGA Piped Water Supply Scheme at Memari-I Block , SM/07855 Retrofitting Sinking of additional 250 X 200mm dia Tube Well 150 mtr. Depth by D.R. Rig method using UPVC pipe (CD) and UPVC Deep Well Screen (RDS) for MAHESHDANGA Piped Water Supply Scheme, Block - Memari - I, Dist - Purba Bardhaman under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000072/2022-2023 2472/BWD 12/05/2022 30 NADIA TUBEWELLS 10.32 0.00 0 1
2596 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of MAHESHDANGA Piped Water Supply Scheme at Memari-I Block , SM/07855 Retrofitting Earth work in excavation including shoring work of 700 cum capacity 20 Mtr staging height RCC Over Head Reservoir of Mahesdanga water supply scheme of Memari-I Block under Burdwan Division, PHE Dte.[Gr.-A] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000770/2021-2022 1365/BSD 05/10/2021 5 SK ALIM 4.73 0.00 0 1
2597 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of MAHESHDANGA Piped Water Supply Scheme at Memari-I Block , SM/07855 Retrofitting Laying of 200mm.dia. HDPE Distribution pipe line(Node No.401B to 401)for MAHESHDANGA & adjoining mouzas Water Supply Scheme at Memari-I Development block under Burdwan Division,PHE Dte. Group - D. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000091/2022-2023 831/BSD 23/05/2022 30 M/S ASHA CONSTRUCTION 4.49 0.00 0 1
2598 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of MAHESHDANGA Piped Water Supply Scheme at Memari-I Block , SM/07855 Retrofitting Earth filling and sand filling in excavated portion and land development at Head work site of 700 cum capacity 20 Mtr staging height RCC Over Head Reservoir of Mahesdanga water supply scheme of Memari-I Block under Burdwan Division, PHE Dte.[Gr.-A] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000773/2021-2022 1408/BSD 08/10/2021 5 M/S PROCHESTA ENTERPRISE 4.14 0.00 0 1
2599 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of MAHESHDANGA Piped Water Supply Scheme at Memari-I Block , SM/07855 Retrofitting Construction of boundary wall including land development at 2nd Tube Well site of MAHESHDANGA water supply scheme under Memari-I Block of Burdwan Division, PHE Dte. (Length -52.00 Mtr, Col-20 Nos). " Group : C. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000106/2022-2023 985/BSD 16/06/2022 45 MAA MAHAMAYA CONSTRUCTION 3.46 0.00 0 1
2600 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of MAHESHDANGA Piped Water Supply Scheme at Memari-I Block , SM/07855 Retrofitting Construction of boundary wall (SOUTH side) at Pump house no - I Site of Maheshdanga Water Supply Scheme under Memari-I Dev. Block of Burdwan Division, PHE Dte. (Length -58.00 Mtr, Col-21 Nos). Gr. G Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000475/2021-2022 280/BSD 15/02/2022 45 SK ABDUL HALIM 4.19 0.00 0 1
2601 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of MAHESHDANGA Piped Water Supply Scheme at Memari-I Block , SM/07855 Retrofitting Construction of 168 Mtr long P.C.C Approach road from Main Road to OHR site and inside boundary of OHR Site of MAHESHDANGA PWSS under Memari-I Development Block under Burdwan Division PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000530/2023-2024 3627/BWD 21/08/2023 30 MANAS BHATTACHARYA 5.95 5.30 89.08 100
2602 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of MAHESHDANGA Piped Water Supply Scheme at Memari-I Block , SM/07855 Retrofitting Material Requisition To Resource Division RTOR000020/2021-2022 421/BWD 20/01/2022 0 Resource Division 5.49 0.00 0 0
2603 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of MAHESHDANGA Piped Water Supply Scheme at Memari-I Block , SM/07855 Retrofitting Replacement of fully damaged PVC water supply line at Dulepara along National Highway for MAHESDANGA and its adj.mouza W/S Scheme,Block:Memari-I within Burdwan Sub-Division,PHE Dte Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. Junior Engineer, RWS, Memari-I Dev. Bolck ORD/000870/2023-2024 2746/BSD 28/11/2023 30 SUPRIYA RAY 0.96 0.00 0 100
2604 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of MAHESHDANGA Piped Water Supply Scheme at Memari-I Block , SM/07855 Retrofitting Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of Maheshdanga Piped Water Supply Scheme at Deule Village (4 Nos. habitations), Memari ¿ I Block under Burdwan Division, PHE Dte. AE(HQs) J.E. 2 BURDWAN ORD/000638/2020-2021 1796/A/BWD 26/02/2021 45 INVENT ENGINEERS CO. OPERATIVE SOCIETY LTD. 27.66 55.30 199.93 0
2605 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of SHURA Piped Water Supply Scheme at Jamalpur Block , SM/07858 Retrofitting Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of Shura (Zone-I) Piped Water Supply Scheme at Shura Village (3 Nos. habitations), Chakdihi Village & Shukpur Village, Jamalpur Block under Burdwan Division, PHE Dte. AE(HQs) ORD/000675/2020-2021 1763/BWD 26/02/2021 60 SUKALPA NIRMAN 83.40 108.82 130.48 1
2606 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of SHURA Piped Water Supply Scheme at Jamalpur Block , SM/07858 Retrofitting Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of Shura (Zone-II) Piped Water Supply Scheme at Haragobindapur Village, Kubajpur Village, Dhapdhara Village, Sonargoria Village, Sahahosenpur Village & Paikpara Village Jamalpur Block under Burdwan Division, PHE Dte. (Agreement No. 687/BWD of 2020-2021) AE(HQs) ORD/000338/2020-2021 1324/BWD 12/02/2021 60 M/S PIONEER CONSTRUCTION 73.63 71.52 97.13 1
2607 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of SHURA Piped Water Supply Scheme at Jamalpur Block , SM/07858 Retrofitting Hire & fuel charges of vehicle (Car No.-WB-41H-9788) for the office of the Assistant Engineer, Headquarters, Burdwan Division, PHE Dte. for the month of September & October'2022. VCH/000839/2022-2023 766/VEH/22-23 22/11/2022 0 SK. ASRAFUDDIN 0.70 0.00 0 0
2608 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of SHURA Piped Water Supply Scheme at Jamalpur Block , SM/07858 Retrofitting Relaying of UPVC pipe damaged due to construction of guard wall to maintain water supply at different location within command area of SURAH ZONE II PWSS Block Jamalpur under Burdwan Division P.H.E Dte. AE(HQs) J.E. 2 BURDWAN,Junior Engineer, Burdwan Division ORD/000625/2022-2023 523/AE/HQ 29/09/2022 30 J. K. CORPORATION 0.41 0.00 0 0
2609 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of SHURA Piped Water Supply Scheme at Jamalpur Block , SM/07858 Retrofitting Laying of HDPE pipe for providing FHTC in different habitation of Shura Mouza within Shura Piped Water Supply Scheme (Zone-I), Jamalpur Block under Burdwan Division, P.H.E DTE. [Group: ¿A¿] AE(HQs) ORD/000225/2021-2022 1815/AE/HQ 21/09/2021 30 SUKALPA NIRMAN 4.79 4.22 88.1 1
2610 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of SHURA Piped Water Supply Scheme at Jamalpur Block , SM/07858 Retrofitting Laying of HDPE pipe for underground crossing of river embankment at different section of Shura piped water supply scheme (Zone-II) under Burdwan Division, PHE Dte. [Gr.-A] AE(HQs) ORD/000414/2021-2022 1855/AE/HQ 05/10/2021 30 M/S PIONEER CONSTRUCTION 4.67 0.00 0 1
2611 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of SHURA Piped Water Supply Scheme at Jamalpur Block , SM/07858 Retrofitting Laying of rising main for interconnection of Pump House 1 & 2 and distribution main along with bye pass arrangement for Over Head Reservoir for Shura piped water supply scheme (Zone-II) within Jamalpur Block under Burdwan Division, PHE Dte.[Gr.-B] AE(HQs) ORD/000924/2020-2021 1226/AE/HQ 10/02/2021 30 M/S UNIT CONSTRUCTION 4.29 0.00 0 1
2612 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of SHURA Piped Water Supply Scheme at Jamalpur Block , SM/07858 Retrofitting Laying of HDPE pipeline at Shura, Chakdighi and Shukpur village for providing FHTC within Shura PWSS (Zone-I), Block-Jamalpur under Burdwan Division, PHE Dte._Gr-A AE(HQs) ORD/000626/2021-2022 124/AE/HQ 04/03/2022 15 BANGA NIRMAN 4.71 4.56 96.82 1
2613 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of SHURA Piped Water Supply Scheme at Jamalpur Block , SM/07858 Retrofitting Laying of HDPE pipeline at Dhapdhara village for providing FHTC within SHURA PWSS (Zone-II), Block-Jamalpur under Burdwan Division, PHE Dte._Gr-A AE(HQs) ORD/000665/2021-2022 133/AE/HQ 11/03/2022 20 M/S UNIT CONSTRUCTION 2.79 2.79 100 1
2614 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of SHURA Piped Water Supply Scheme at Jamalpur Block , SM/07858 Retrofitting Supply & delivery of different dia. CIDF Pipes, Sluice valve & fittings for construction of RCC OHR (350 cum capacity) for SHURA (ZONE-I) W/S. Scheme under Burdwan Division, P.H.E. Dte. [Group: B] AE(HQs) ORD/000742/2021-2022 165/AE/HQ 24/03/2022 10 BENGAL BUILDERS 3.08 0.00 0 1
2615 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of SHURA Piped Water Supply Scheme at Jamalpur Block , SM/07858 Retrofitting Laying of rising main for interconnection of Pump House -1 &2 and distribution main alongwith bye-pass arrangement for Over Head Reservoir for Shura piped water supply scheme (Zone-I) within Jamalpur Block under Burdwan Division, PHE Dte.[Gr.-A] AE(HQs) ORD/000929/2020-2021 1228/AE/HQ 10/02/2021 30 BENGAL BUILDERS 4.71 0.00 0 1
2616 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of SHURA Piped Water Supply Scheme at Jamalpur Block , SM/07858 Retrofitting Laying of HDPE pipeline at Sonargoria and Kubajur village for providing FHTC within Shura PWSS (Zone-II), Block-Jamalpur under Burdwan Division, PHE Dte._2ND CALL [Group : F] AE(HQs) ORD/000050/2022-2023 204/AE/HQ 06/04/2022 30 M/S UNIT CONSTRUCTION 4.81 4.71 97.92 1
2617 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of SHURA Piped Water Supply Scheme at Jamalpur Block , SM/07858 Retrofitting Providing Functional Household Tap Connection (FHTC) from existing distribution system at leftout area of Chakdighi Gram Panchayat within the command area of SHURA ZONE-I Piped Water Supply Scheme at Jamalpur Block under Burdwan Division, PHE Dte. GROUP : C AE(HQs) ORD/000229/2022-2023 426/AE/HQ 03/08/2022 30 D.M. ENTERPRISE 3.25 3.24 99.69 1
2618 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of SHURA Piped Water Supply Scheme at Jamalpur Block , SM/07858 Retrofitting Supplying, laying, fitting, fixing of Sluice valve including construction of valve chamber within command area of SURAH ZONE I PWSS Block Jamalpur under Burdwan Division P.H.E Dte. AE(HQs) J.E. 2 BURDWAN ORD/000626/2022-2023 524/AE/HQ 29/09/2022 30 D.M. ENTERPRISE 0.41 0.37 90.24 100
2619 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of SHURA Piped Water Supply Scheme at Jamalpur Block , SM/07858 Retrofitting Extension of pipeline for SHURA (Zone-I) Piped W/S. Scheme Total 115 Nos. FHTC work for Sajal Gram (As per Field Verification Report for Har Ghar Jal Certification within Jamalpur Block including leftout household water tap connection (FHTC) under Burdwan Division, PHE Dte. AE(HQs) J.E. 3 BURDWAN ORD/000751/2022-2023 1185/BWD 15/03/2023 30 SK NUR ALAM 3.52 3.30 93.75 100
2620 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of SHURA Piped Water Supply Scheme at Jamalpur Block , SM/07858 Retrofitting Extension of pipeline for SHURA (Zone-II) Piped W/S. Scheme Total 129 Nos. FHTC work for Sajal Gram (As per Field Verification Report for Har Ghar Jal Certification within Jamalpur Block including leftout household water tap connection (FHTC) under Burdwan Division, PHE Dte. AE(HQs) ORD/000723/2022-2023 970/BWD 03/03/2023 30 SANDIPAN SENGUPTA 4.08 4.08 100 1
2621 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of SHURA Piped Water Supply Scheme at Jamalpur Block , SM/07858 Retrofitting Beautification work at Head work, 2nd Pump house site of Surah Zone-I PWSS with Arboriculture, Recharge Pit including shaft and anciliary works at (Jamalpur Block) P.W.S.S under Burdwan Division, PHE Dte. Junior Engineer, R.W.S. Burdwan Sub Division, P.H.E. Dt ORD/000549/2024-2025 280/RWS 03/09/2024 10 D.M. ENTERPRISE 0.97 0.00 0 0
2622 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of SHURA Piped Water Supply Scheme at Jamalpur Block , SM/07858 Retrofitting Beautification work at Head work, 2nd Pump house site of Surah Zone-II PWSS with Arboriculture, Recharge Pit including shaft and anciliary works at (Jamalpur Block) P.W.S.S under Burdwan Division, PHE Dte. Junior Engineer, R.W.S. Burdwan Sub Division, P.H.E. Dt ORD/000550/2024-2025 281/RWS 27/08/2024 10 J.K. CORPORATION 0.97 0.00 0 0
2623 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of SHURA Piped Water Supply Scheme at Jamalpur Block , SM/07858 Retrofitting Extension of pipeline & providing Functional House Tap Connection at leftout portion of SHURA Zone-II W/S Scheme within Jamalpur Block under Burdwan Division, P.H.E Dte. AE(HQs) J.E. 2 BURDWAN,Junior Engineer, Burdwan Division ORD/000571/2023-2024 764/AE/HQ 25/08/2023 30 SANDIPAN SENGUPTA 3.93 3.93 100 100
2624 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of SHURA Piped Water Supply Scheme at Jamalpur Block , SM/07858 Retrofitting Re-laying of UPVC (Damaged By WBSRDA Department) pipeline near Dhapdhara Uttor Pal Para under SHURA Z-II PWSS, Jamalpur Dev. Block under Burdwan Division, PHE Dte. AE(HQs) Junior Engineer, Burdwan Division ORD/000590/2024-2025 742/AE/HQ 13/09/2024 30 J.K. CORPORATION 0.96 0.96 100 100
2625 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of SHURA Piped Water Supply Scheme at Jamalpur Block , SM/07858 Retrofitting Shifting & Relaying of Damaged UPVC Pipeline at Chakdighi for Construction of Road under "PATHASHREE", SHURA ZONE-I PWSS, Jamalpur Dev. Block under Burdwan Division, PHE Dte. AE(HQs) Junior Engineer, Burdwan Division ORD/000627/2024-2025 745/AE/HQ 13/09/2024 30 D.M. ENTERPRISE 0.95 0.95 100 100
2626 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of SHURA Piped Water Supply Scheme at Jamalpur Block , SM/07858 Retrofitting Re-laying of UPVC (Damaged By WBSRDA Department) pipeline near Dhapdhara Bostom Para under SHURA Z-II PWSS, Jamalpur Dev. Block under Burdwan Division, PHE Dte. AE(HQs) Junior Engineer, Burdwan Division ORD/000591/2024-2025 743/AE/HQ 13/09/2024 30 J.K. CORPORATION 0.94 0.94 100 100
2627 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of SHURA Piped Water Supply Scheme at Jamalpur Block , SM/07858 Retrofitting Re-laying of UPVC (Damaged By WBSRDA Department) pipeline near Dhapdhara Purba Pal Para under SHURA Z-II PWSS, Jamalpur Dev. Block under Burdwan Division, PHE Dte. AE(HQs) Junior Engineer, Burdwan Division ORD/000592/2024-2025 744/AE/HQ 13/09/2024 30 J.K. CORPORATION 0.96 0.96 100 100
2628 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of SHURA Piped Water Supply Scheme at Jamalpur Block , SM/07858 Retrofitting Laying of different dia UPVC pipeline for providing FHTC work at various places under SHURA ZONE- I PWSS, Jamalpur Dev. Block under Burdwan Division, PHE Dte. AE(HQs) Junior Engineer, Burdwan Division ORD/001028/2023-2024 97/AE/HQ 15/02/2024 30 D.M. ENTERPRISE 0.93 0.93 100 100
2629 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of SHURA Piped Water Supply Scheme at Jamalpur Block , SM/07858 Retrofitting Construction & Installation of Sluice valve & valve Chamber to control the flow of water under SHURA ZONE-I PWSS, Jamalpur Dev. Block under Burdwan Division, PHE Dte. AE(HQs) Junior Engineer, Burdwan Division ORD/001029/2023-2024 98/AE/HQ 15/02/2024 30 D.M. ENTERPRISE 0.76 0.76 100 100
2630 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of SHURA Piped Water Supply Scheme at Jamalpur Block , SM/07858 Retrofitting Shifting & Relaying of Damaged UPVC Pipeline at Chakdighi Baganbari for Construction of Road under "PATHASHREE", SHURA ZONE-I PWSS, Jamalpur Dev. Block under Burdwan Division, PHE Dte. AE(HQs) Junior Engineer, Burdwan Division ORD/000628/2024-2025 746/AE/HQ 13/09/2024 30 D.M. ENTERPRISE 0.72 0.72 100 100
2631 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of ISUFABAD Piped Water Supply Scheme , SM/07860 Retrofitting Pipeline with FHTC for Isufabad Water Supply Scheme at Fagupur village (15 Nos) of Burdwan-I Block, under Burdwan Division, PHE Dte. Gr.C. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000476/2022-2023 1600/BSD 14/09/2022 30 DUBE ENTERPRISE 3.08 2.78 90.26 1
2632 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of ISUFABAD Piped Water Supply Scheme , SM/07860 Retrofitting Pipeline with FHTC for Isufabad Water Supply Scheme at ISUFABAD village (15 Nos) of Burdwan-I Block, under Burdwan Division, PHE Dte. Gr.J. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000483/2022-2023 1607/BSD 14/09/2022 30 DUBE ENTERPRISE 1.89 1.63 86.24 1
2633 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of ISUFABAD Piped Water Supply Scheme , SM/07860 Retrofitting Extension of pipeline for ISUFABAD Water Supply Scheme at KASIMPUR village within BURDWAN-I Block , under Burdwan Division, PHE Dte.Gr.A Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000473/2021-2022 274/BSD 15/02/2022 30 SUPRIYA RAY 4.98 0.00 0 1
2634 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of ISUFABAD Piped Water Supply Scheme , SM/07860 Retrofitting Providing 19 Nos. FHTC at ISHUFABAD & GRAMGORIA village for declaration of SWAJALGRAM under ISHUFABAD Piped Water Supply Scheme, Block- Burdwan-I within Burdwan Sub Division under Burdwan Division PHE Dte JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000152/2024-2025 1037/BSD 10/06/2024 30 DEBASHISH ENTERPRISE 0.91 0.00 0 0
2635 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of ISUFABAD Piped Water Supply Scheme , SM/07860 Retrofitting Providing 35 Nos.FHTC at KASHIMPUR village for declearation of SWAJALGRAM under ISHUFABAD Piped Water Supply Scheme, Block- Burdwan-I within Burdwan Sub Division under Burdwan Division PHE Dte. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000296/2024-2025 1278/BSD 12/07/2024 45 DUBE ENTERPRISE 1.64 0.00 0 0
2636 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of ISUFABAD Piped Water Supply Scheme , SM/07860 Retrofitting Conducting physical Household Survey at the IMIS reported village for HGJ certification and providing balance FHTC for Har Ghar Jal certification including conducting Gram Sabhas for different IMIS reported villages across the district under Burdwan Division, PHE Dte. AE(HQs),Assistant Engineer ,Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE.,Assistant Engineer, Durgapur Sub Division, P.H.E. Dte JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000428/2024-2025 3107/BWD 12/08/2024 323 TUBGRAM GRAMMYAK UNNAYAN SAMITY 309.60 0.00 0 85
2637 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Nadangahat Piped Water Supply Scheme , SM/07801 Retrofitting Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Dhamai village and Dhamai habitation of Nadanghat piped water supply scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. [Phase-I](Tr No.-558/BWD/2020-21) Assistant Engineer ORD/000255/2020-2021 4120/BWD 16/10/2020 30 NANDY UDYOG 4.85 9.69 199.79 1
2638 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Nadangahat Piped Water Supply Scheme , SM/07801 Retrofitting Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Dhamai village and Nimar habitation of Nadanghat piped water supply scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. [Phase-I](Tr No.-389/BWD/2020-21) Assistant Engineer ORD/000258/2020-2021 4121/BWD 16/10/2020 30 RUPALI ENTERPRISE 4.86 9.73 200.21 1
2639 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Nadangahat Piped Water Supply Scheme , SM/07801 Retrofitting Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of Nadanghat Piped Water Supply Scheme at Kundapara village & Nadanghat village, Purbasthali - I Block under Burdwan Division, PHE Dte. (Agreement No. 700/BWD of 2020-2021) Assistant Engineer ORD/000334/2020-2021 1543/BWD 22/02/2021 60 MAA LAXMI ENTERPRISE 51.66 50.07 96.92 1
2640 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Nadangahat Piped Water Supply Scheme , SM/07801 Retrofitting Providing functional household tap connection (FHTC) from existing distribution system within the command area of Nadanghat piped water supply scheme at Kundapara village (37 nos FHTC) & Nadanghat village (75 nos FHTC), Purbasthali-I Block within Kalna Sub-Division under Burdwan Division, PHE Dte. (Sl No-B) Assistant Engineer ORD/000470/2021-2022 153/KSD 15/02/2022 15 MAA LAXMI ENTERPRISE 4.51 4.49 99.56 1
2641 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Nadangahat Piped Water Supply Scheme , SM/07801 Retrofitting Hire & fuel charges of vehicle (Car No.-WB-04G-7127) for the office of the Assistant Engineer, Kalna Sub-Division, PHE Dte. for the month of December22 to February'23. BILL/00118/2023-2024 30/JJM 19/04/2023 0 PARTHA PRATIM ACHARYA 1.19 0.00 0 0
2642 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of RAIPUR Piped Water Supply Scheme , SM/07865 Retrofitting Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Basatpur village of Raipur Piped Water Supply Scheme within Burdwan Sub-Divn. under Burdwan Division, PHE. Dte. [Phase - I] [GROUP : ¿1A¿] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000679/2020-2021 2726/BWD 10/08/2020 30 ASHOK KUMAR GHOSH 4.92 4.92 100 1
2643 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of RAIPUR Piped Water Supply Scheme , SM/07865 Retrofitting Providing FHTC in Purba Kashiara village for 100% coverage in Sajal Gram from existing distribution system within RAIPUR PWSS, Bardhhaman-II Development Block under Burdwan Division, PHE Dte. Gr.E. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000345/2022-2023 1368/BSD 04/08/2022 5 ASHOK KUMAR GHOSH 0.68 0.00 0 0
2644 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of RAIPUR Piped Water Supply Scheme , SM/07865 Retrofitting Providing FHTC and extension of UPVC distribution pipeline at Raipur, Gumri, Namalpur & Mahipal habitation for RAIPUR Piped Water Supply Scheme at Burdwan - II Development Block under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000358/2021-2022 104/BWD 06/01/2022 30 ROY CONSTRUCTION 23.65 23.65 100 1
2645 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of RAIPUR Piped Water Supply Scheme , SM/07865 Retrofitting Shifting & Relaying of 2nd T.Well Raising main and providing 5 nos (100mm dia) S/Valve at existing dist. Line for Raipur water supply scheme at Bardhhaman-II Development Block under Burdwan Division, PHE Dte. Group: H Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000481/2022-2023 1605/BSD 14/09/2022 30 ASHOK KUMAR GHOSH 1.72 0.00 0 0
2646 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of RAIPUR Piped Water Supply Scheme , SM/07865 Retrofitting Providing functional household tap connection (FHTC) from existing distribution system within the command area of Raipur piped water supply scheme at Mahipal (05 Nos Habitation), Purba Kashiara (08 Nos. Habitation), Sahara (04 Nos. Habitation), Sonakur (07 Nos. Habitation), Baratpur (16 Nos, Habitation) & Raipur (10 Nos. Habitation) village, Bardhaman-II Block under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000533/2020-2021 5007/BWD 10/12/2020 90 ASHOK KUMAR GHOSH 43.99 3.76 8.55 1
2647 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of RAIPUR Piped Water Supply Scheme , SM/07865 Retrofitting Providing FHTC (12 Nos.) and extension of UPVC distribution pipeline at Basatpur Habitation for Raipur water supply scheme at Burdwan-II Development Block under Burdwan Division, PHE Dte.[Gr.-A] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000543/2021-2022 1461/BSD 01/11/2021 30 ASHOK KUMAR GHOSH 2.14 2.14 100 1
2648 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of RAIPUR Piped Water Supply Scheme , SM/07865 Retrofitting Sinking of 300 X 200mm dia Tube Well 150 mtr. Depth by D.R. Rig method using UPVC pipe (CM) and UPVC Deep Well Screen (RMS) of RAIPUR & its adjoining mouzas Piped Water Supply Scheme, Block - Burdwan - II, Dist - Purba Bardhaman under Burdwan Division, PHE Dte. _2ND CALL. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000568/2022-2023 5273/BWD 30/11/2022 30 SUSUNIA GP CO. OPERATIVE LABOUR CONTRACT AND CONSTRUCTION SOCIETY LTD. 9.45 7.80 82.54 1
2649 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of RAIPUR Piped Water Supply Scheme , SM/07865 Retrofitting Construction of Pump House cum chlorine room without sanitary and water supply arrangement at Tube Well Site to departmental drawing no-PHE/BD/P.H/DRG/02/DEC-17(Size 3.60 mtr x 3.00 mtr room) for RAIPUR its Adjoining Mouza W/S Scheme, Block -Bardhaman-II within Burdwan Sub-Division, PHE Dte. (Mouza- PURBA KASHIARA) Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000839/2022-2023 501/BSD 21/03/2023 45 IRIN CONSTRUCTION CO. 3.30 2.72 82.42 100
2650 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of RAIPUR Piped Water Supply Scheme , SM/07865 Retrofitting Laying of inter connection between 3rd tube well site and distribution system for Raipur PWSS within Bardhaman-II Block, under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. Junior Engineer, Burdwan Sadar Sub-Division ORD/000574/2023-2024 2039/BSD 24/08/2023 45 ISHAN CONSTRUCTION 1.57 1.56 99.36 100
2651 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of RAIPUR Piped Water Supply Scheme , SM/07865 Retrofitting Designing, Making and Erection of Sign Board for SAJAL GRAM in Basatpur Village, Burdwan - II Block within Raipur PWSS under Burdwan Division, PHE Dte. (5 Nos Board) AE(HQs) J.E. 1 BURDWAN ORD/000776/2023-2024 856/AE/HQ 06/11/2023 30 MANABSEBA PROKALPA & CONSTRUCTIONS 0.75 0.72 96 100
2652 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of RAIPUR Piped Water Supply Scheme , SM/07865 Retrofitting Designing, Making and Erection of Sign Board for SAJAL GRAM in Mahipal Village, Burdwan - II Block within Raipur PWSS under Burdwan Division, PHE Dte. (5 Nos Board) AE(HQs) J.E. 1 BURDWAN ORD/000775/2023-2024 854/AE/HQ 06/11/2023 30 MANABSEBA PROKALPA & CONSTRUCTIONS 0.75 0.72 96 100
2653 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of RAIPUR Piped Water Supply Scheme , SM/07865 Retrofitting Designing, Making and Erection of Sign Board for SAJAL GRAM in Purba Kashiara Village, Burdwan - II Block within Raipur PWSS under Burdwan Division, PHE Dte. (5 Nos Board) AE(HQs) J.E. 1 BURDWAN ORD/000778/2023-2024 857/AE/HQ 06/11/2023 30 MANABSEBA PROKALPA & CONSTRUCTIONS 0.75 0.72 96 100
2654 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of RAIPUR Piped Water Supply Scheme , SM/07865 Retrofitting Designing, making and erection of Sign Board for SWAJAL GRAM in Sehara village of Burdwan-II Block under Raipur Piped Water Supply Scheme within Burdwan Sub-Division under Burdwan Division, PHE Dte. (5 nos Board) Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. Junior Engineer, Burdwan Sadar Sub-Division ORD/000491/2025-2026 2361/BSD 21/08/2025 10 MANABSEBA PROKALPA & CONSTRUCTIONS 0.72 0.00 0 100
2655 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of RAIPUR Piped Water Supply Scheme , SM/07865 Retrofitting Designing, making and erection of Sign Board for SWAJAL GRAM in Sonakur village of Burdwan-II Block under Raipur Piped Water Supply Scheme within Burdwan Sub-Division under Burdwan Division,PHE Dte(5 nos. Board) Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. Junior Engineer, Burdwan Sadar Sub-Division ORD/000469/2025-2026 2335/BSD 21/08/2025 10 MANABSEBA PROKALPA & CONSTRUCTIONS 0.72 0.00 0 100
2656 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Lohai Piped Water Supply Scheme at Raina-II Block , SM/07779 Retrofitting Continuation work order for Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Natungram village and Natungram, Daspara, Palpara habitation of Lohana piped water supply scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. [Phase-I](Tr No.-475/BWD/2020-21) Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000370/2020-2021 4781/BWD 02/12/2020 30 PARTHA PRATIM ACHARYA 2.95 0.00 0 1
2657 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Lohai Piped Water Supply Scheme at Raina-II Block , SM/07779 Retrofitting Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of LOHAI Piped Water Supply Scheme at Madhabdihi, Bhanjanpur, Akhina & Dakhin Gopalpur Village (Mouza), Raina-II Block under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000157/2021-2022 4635/BWD 09/09/2021 60 CREATION CONSTRUCTION 61.85 25.75 41.63 1
2658 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Lohai Piped Water Supply Scheme at Raina-II Block , SM/07779 Retrofitting Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of Lohai Piped Water Supply Scheme at Arui, Dighra, Jotragob, Konerpur & Lohai Village (Mouza), Raina-II Block under Burdwan Division, PHE Dte. [Agreement No. 54/2020-2021 OF SE/CC/PHE. DTE.] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000419/2020-2021 4888/BWD 07/12/2020 90 M/S S. CHOUDHURY 75.66 31.29 41.36 1
2659 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Lohai Piped Water Supply Scheme at Raina-II Block , SM/07779 Retrofitting Plinth protection and uplift of inner side of base floor of OHR and construction of sluice valve chamber at LOHAI PWSS at Raina-II Block under Burdwan Division PHE Dte. [Group : B] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000359/2022-2023 446/AE/HQ 16/08/2022 30 INDIAN ENGINEERS CO.-OPERATIVE SOCIETY LTD. 1.91 1.82 95.29 1
2660 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Lohai Piped Water Supply Scheme at Raina-II Block , SM/07779 Retrofitting Continuation work order for Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Barakalmi & Sirajpur village of Lohana Piped Water Supply Scheme within Kalna Sub-Divn. under Burdwan Division, PHE. Dte. [SL. No. : 22] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000195/2021-2022 6188/BWD 28/10/2021 15 PARTHA PRATIM ACHARYA 4.86 0.00 0 1
2661 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Lohai Piped Water Supply Scheme at Raina-II Block , SM/07779 Retrofitting Laying of uPVC pipe for providing FHTC in different habitation of Lohai, Akhina and Dakshin Gopalpur Mouza within Lohai Piped Water Supply Scheme, Raina-II Block under Burdwan Division P.H.E DTE. [Group: ¿E¿] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000221/2021-2022 1816/AE/HQ 21/09/2021 30 M/S S. CHOUDHURY 4.76 4.68 98.32 1
2662 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Lohai Piped Water Supply Scheme at Raina-II Block , SM/07779 Retrofitting Laying of uPVC pipe for providing FHTC at Madhabdihi, Lohai and Akhina Village within LOHAI Piped Water Supply Scheme, Raina-II Block under Burdwan Division P.H.E Dte._Gr-E Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000668/2021-2022 137/AE/HQ 15/03/2022 20 M/S S. CHOUDHURY 4.80 4.80 100 1
2663 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Lohai Piped Water Supply Scheme at Raina-II Block , SM/07779 Retrofitting Laying of uPVC pipe for providing FHTC at Bhanjapur, Alampur and Akhina Village within Lohai Piped Water Supply Scheme, Raina-II Block under Burdwan Division P.H.E Dte.Gr. E Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000630/2021-2022 127/AE/HQ 04/03/2022 15 M/S S. CHOUDHURY 4.79 4.48 93.53 1
2664 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Lohai Piped Water Supply Scheme at Raina-II Block , SM/07779 Retrofitting Laying of dedicated HDPE pipeline for supply of sufficient water at Bhanjapur village of Lohai piped water supply scheme, Raina-II Block under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000575/2021-2022 6741/BWD 03/12/2021 30 THREE MAA ENTERPRISE 20.11 0.00 0 1
2665 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Lohai Piped Water Supply Scheme at Raina-II Block , SM/07779 Retrofitting Extension of pipeline for providing functional house hold tap connection at Bhanjapur Mouza within Lohai water supply scheme under Burdwan Division, PHE Dte.[Gr.-D] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000969/2020-2021 1259/AE/HQ 15/02/2021 30 M/S S. CHOUDHURY 4.14 3.26 78.74 1
2666 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Lohai Piped Water Supply Scheme at Raina-II Block , SM/07779 Retrofitting MAINTENANCE OF ROAD (WHISH IS DAMAGED FOR LAYING PIPELINE BY PHE DEPTT) NAMELY NARUGRAM H.C TO BADSHI ROAD VIDE- PACKAGE NO- WB 22 12 UNDER PMGSY-III UNDER NARUGRAM GP. & RAINA-I BLOCK, IN PURBA BARDHAMAN DISTRICT BILL/00740/2024-2025 894/JJM 25/09/2024 0 EXECUTIVE ENGINEER (WBSRDA) PURBA BARDHAMAN DIVISION 3.86 0.00 0 0
2667 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Lohai Piped Water Supply Scheme at Raina-II Block , SM/07779 Retrofitting Balance Work for extension of pipe lines to provide FHTC with Sinking of Tubwell, Construction of pump house with Boundary wall & other related work for LOHAI PWSS under Burdwan Sub-Div., Block -Raina-II, under Burdwan Division PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/001014/2024-2025 61/BWD 06/01/2025 120 B.S. ENTERPRISE 62.48 0.00 0 0
2668 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Ghosh Piped Water Supply Scheme , SM/07821 Retrofitting Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of GHOSH Piped Water Supply Scheme at Andur & Bahapur village (Mouza), Memari ¿ I Block under Burdwan Division, PHE Dte.(Agreement No. 577/BWD of 2020-2021) Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000328/2020-2021 437/BWD 24/02/2021 30 MAJILA ENTERPRISE 22.76 0.00 0 1
2669 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Ghosh Piped Water Supply Scheme , SM/07821 Retrofitting Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of Ghosh Piped Water Supply Scheme at Mondaljana Part (Bajamondaljana, Kashirampur & Mondaljana Habitation), Horirampur & Ghosh Part Village (Mouza) Memari-I Block under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000102/2021-2022 3781/BWD 22/07/2021 30 KAUSHIK RAY 20.09 40.18 200 1
2670 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Ghosh Piped Water Supply Scheme , SM/07821 Retrofitting Providing FHTC from dist. System within the command area of GHOSH Piped Water Supply Scheme at Kashirampur, Joyampur, Sajina, Ichapur, Purba-Gantar, Andur, Bahabpur & Ghosh (Part) village (Mouza) at Memari-I Development Block under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. Junior Engineer, RWS, Memari-I Dev. Bolck ORD/000338/2021-2022 25/BWD 04/01/2022 30 MAJILA ENTERPRISE 36.17 36.79 101.71 1
2671 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Ghosh Piped Water Supply Scheme , SM/07821 Retrofitting Extension of pipeline for GHOSH Piped Water Supply Scheme at Mondaljone (6 Nos), Kashirampur (8 Nos),Total 14 Nos FHTC Work for Sajal Gram(As per Field verification report for Har Ghar Jal Certification within Memari-I Block including leftout household water connection (FHTC) under Burdwan Division,PHE Dte. Gr.A. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000333/2022-2023 1350/BSD 02/08/2022 5 MAJILA ENTERPRISE 0.97 0.97 100 1
2672 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Ghosh Piped Water Supply Scheme , SM/07821 Retrofitting Extension of pipeline for GHOSH Piped Water Supply Scheme at Mondaljona [6 No's], Kashirampur [8 No's],Total 14 No's FHTC Work for Sajal Gram (As per Field Verification Report for Har Ghar Jal Certification within Memari-I Block including leftout husehold water tap connection(FHTC) under Burdwan Division, PHE Dte. ORD/000644/2022-2023 1350-A/BSD 02/08/2022 5 MAJILA ENTERPRISE 0.97 0.00 0 0
2673 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Ghosh Piped Water Supply Scheme , SM/07821 Retrofitting Providing leftout water tap connection in different villages for 100% coverage to make it Sajal Gram from existing distribution system within scheme jurisdiction of different Piped Water Supply Schemes within Memari-I Block (Daluibazar-II, Gopegantar-I & II G.P.) under Burdwan Division, PHE. Dte. Dte._Part-A. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000371/2021-2022 209/BWD 11/01/2022 30 M/S ANAND CONSTRUCTION 21.11 0.00 0 1
2674 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Ghosh Piped Water Supply Scheme , SM/07821 Retrofitting Re-Laying of damaged pipeline on distribution system for FHTC work for GHOSH Piped Water Supply Scheme at JOY RAMPUR mouza within MEMARI - I BLOCK under Burdwan Division, PHE Dte. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/001070/2024-2025 104/BSD 16/01/2025 30 N.S. ENTERPRISE 4.81 0.00 0 0
2675 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Kasiara Piped Water Supply Scheme atMangolkote Block , SM/07811 Retrofitting Continuation work order for Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Chanak village of Kashiara piped water supply scheme within Katwa Sub-Division under Burdwan Division, PHE Dte. [Phase-I](Tr No.-259/BWD/2020-21) Assistant Engineer JUNIOR ENGINEER R.W.S. BURDWAN SUB-DIVISION PHE DTE ORD/000246/2020-2021 3412/BWD 22/09/2020 30 BABUL SK 4.92 9.84 200 1
2676 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Kasiara Piped Water Supply Scheme atMangolkote Block , SM/07811 Retrofitting Continuation work order for Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Kashiara village of Kasiara piped water supply scheme within Katwa Sub-Division under Burdwan Division, PHE Dte. [Phase-I](Tr No.-260/BWD/2020-21) AE(HQs) J.E. 2 BURDWAN ORD/000245/2020-2021 341/BWD 22/09/2020 30 HAMID SK 4.92 9.84 200 1
2677 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Kasiara Piped Water Supply Scheme atMangolkote Block , SM/07811 Retrofitting Formal Work Order for Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of Kashira Piped Water Supply Scheme at Chanak (Part), Gopalbera, Krishnapur, Gatistha & Kashira (Part) Village (Mouza), Mongolkot Block under Burdwan Division, PHE Dte. (Agreement No. 99/SE/CC/PHE/Dte of 2020-2021) AE(HQs) J.E. 2 BURDWAN ORD/000418/2020-2021 915/BWD 02/02/2021 60 MAJUMDER ENTERPRISE 53.52 91.12 170.25 0
2678 PURBA BARDHAMAN Burdwan Division DETAILED PROJECT REPORT FOR AUGMENTATION OF DOGACHIA PWSS FOR PROVIDING FUNCTIONAL HOUSEHOLD TAP CONNECTION (FHTC) PURBASTHALI-I BLOCK PURBA BARDHAMAN WEST BENGAL , SM/09415 Augmentation Preparation of DPR for augmentation of Dogachia W/S Scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. (Sl No-H) Assistant Engineer ORD/000574/2021-2022 210/KSD 23/02/2022 21 ROY CHOWDHURY ASSOCIATES 2.62 2.65 101.15 1
2679 PURBA BARDHAMAN Burdwan Division DETAILED PROJECT REPORT FOR AUGMENTATION OF DOGACHIA PWSS FOR PROVIDING FUNCTIONAL HOUSEHOLD TAP CONNECTION (FHTC) PURBASTHALI-I BLOCK PURBA BARDHAMAN WEST BENGAL , SM/09415 Augmentation Supply of materials for different water supply scheme under Burdwan Division, PHE Dte. VCH/001578/2021-2022 1207/DW 10/03/2022 0 EXECUTIVE ENGINEER, RESOURCES DIVISION, P.H.E. DTE. 3,005.00 0.00 0 0
2680 PURBA BARDHAMAN Burdwan Division DETAILED PROJECT REPORT FOR AUGMENTATION OF DOGACHIA PWSS FOR PROVIDING FUNCTIONAL HOUSEHOLD TAP CONNECTION (FHTC) PURBASTHALI-I BLOCK PURBA BARDHAMAN WEST BENGAL , SM/09415 Augmentation Supply and delivery of different dia. CIDF sluice valve for Augmentation of DOGACHIA Piped Water Supply Scheme under Burdwan Division, P.H.E. Dte._SL.No-08 Assistant Engineer ORD/000619/2021-2022 142/AE/HQ 16/03/2022 10 MAKALI ENGINEERING CORPORATION 4.52 0.00 0 0
2681 PURBA BARDHAMAN Burdwan Division DETAILED PROJECT REPORT FOR AUGMENTATION OF DOGACHIA PWSS FOR PROVIDING FUNCTIONAL HOUSEHOLD TAP CONNECTION (FHTC) PURBASTHALI-I BLOCK PURBA BARDHAMAN WEST BENGAL , SM/09415 Augmentation Sinking of 250 X 150mm dia Tube Well 150 mtr. Depth by D.R. Rig method using UPVC pipe (CM) and UPVC Deep Well Screen (RMS) for 2nd TW Site of Aug. of DOGACHHIA & its adjoining mouzas Piped Water Supply Scheme, Block ? Purbasthali ? I, Dist - Purba Bardhaman under Burdwan Division, PHE Dte. Assistant Engineer ORD/000547/2022-2023 5129/BWD 21/11/2022 30 MUNSHI ENTERPRISE 8.72 7.89 90.48 0
2682 PURBA BARDHAMAN Burdwan Division DETAILED PROJECT REPORT FOR AUGMENTATION OF DOGACHIA PWSS FOR PROVIDING FUNCTIONAL HOUSEHOLD TAP CONNECTION (FHTC) PURBASTHALI-I BLOCK PURBA BARDHAMAN WEST BENGAL , SM/09415 Augmentation Material Requisition To Resource Division RTOR000149/2021-2022 1247/BWD 07/03/2022 0 Resource Division 4.19 0.00 0 0
2683 PURBA BARDHAMAN Burdwan Division DETAILED PROJECT REPORT FOR AUGMENTATION OF DOGACHIA PWSS FOR PROVIDING FUNCTIONAL HOUSEHOLD TAP CONNECTION (FHTC) PURBASTHALI-I BLOCK PURBA BARDHAMAN WEST BENGAL , SM/09415 Augmentation Material Requisition To Resource Division RTOR000043/2021-2022 541/BWD 27/01/2022 0 Resource Division 9.17 0.00 0 0
2684 PURBA BARDHAMAN Burdwan Division DETAILED PROJECT REPORT FOR AUGMENTATION OF DOGACHIA PWSS FOR PROVIDING FUNCTIONAL HOUSEHOLD TAP CONNECTION (FHTC) PURBASTHALI-I BLOCK PURBA BARDHAMAN WEST BENGAL , SM/09415 Augmentation Material Requisition To Resource Division RTOR000206/2021-2022 1529/BWD 15/03/2022 0 Resource Division 0.37 0.00 0 0
2685 PURBA BARDHAMAN Burdwan Division DETAILED PROJECT REPORT FOR AUGMENTATION OF DOGACHIA PWSS FOR PROVIDING FUNCTIONAL HOUSEHOLD TAP CONNECTION (FHTC) PURBASTHALI-I BLOCK PURBA BARDHAMAN WEST BENGAL , SM/09415 Augmentation Material Requisition To Resource Division RTOR000104/2021-2022 949/BWD 17/02/2022 0 Resource Division 14.44 0.00 0 0
2686 PURBA BARDHAMAN Burdwan Division DETAILED PROJECT REPORT FOR AUGMENTATION OF DOGACHIA PWSS FOR PROVIDING FUNCTIONAL HOUSEHOLD TAP CONNECTION (FHTC) PURBASTHALI-I BLOCK PURBA BARDHAMAN WEST BENGAL , SM/09415 Augmentation Augmentation of DOGACHIA Piped Water Supply Scheme with LDS, FHTC, Rising Main, Construction of 200 Cum capacity OHR with 20.0 Mtr. Staging height inclusive of soil investigation & boundary wall construction at 2nd TW site under Purbasthali ¿ I Block, District - Purba Bardhaman. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000678/2021-2022 1809/BWD 31/03/2022 365 MITRA CONSTRUCTION 226.14 186.35 82.4 60
2687 PURBA BARDHAMAN Burdwan Division DETAILED PROJECT REPORT FOR AUGMENTATION OF DOGACHIA PWSS FOR PROVIDING FUNCTIONAL HOUSEHOLD TAP CONNECTION (FHTC) PURBASTHALI-I BLOCK PURBA BARDHAMAN WEST BENGAL , SM/09415 Augmentation Sinking of tube well, laying dist. system, construction of pump house and laying rising main of DOGACHIA Piped Water Supply Scheme with Kalna Sub-Division under Burdwan Division, PHE. Dte. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000877/2023-2024 5337/BWD 04/12/2023 120 MITRA CONSTRUCTION 78.72 15.34 19.49 20
2688 PURBA BARDHAMAN Burdwan Division DETAILED PROJECT REPORT FOR AUGMENTATION OF DOGACHIA PWSS FOR PROVIDING FUNCTIONAL HOUSEHOLD TAP CONNECTION (FHTC) PURBASTHALI-I BLOCK PURBA BARDHAMAN WEST BENGAL , SM/09415 Augmentation Additional work to implement augmentation of DOGACHHIA Water Supply Scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000929/2023-2024 5512/BWD 14/12/2023 30 PARTHA PRATIM ACHARYA 9.39 6.22 66.24 100
2689 PURBA BARDHAMAN Burdwan Division DETAILED PROJECT REPORT FOR AUGMENTATION OF DOGACHIA PWSS FOR PROVIDING FUNCTIONAL HOUSEHOLD TAP CONNECTION (FHTC) PURBASTHALI-I BLOCK PURBA BARDHAMAN WEST BENGAL , SM/09415 Augmentation Quotation from WBSEDCL for Augmentation of Dogachia water supply scheme for Pump House No.-4 under Burdwan Division, PHE Dte. BILL/00365/2024-2025 566/JJM 23/07/2024 0 WBSEDCL 8.89 0.00 0 0
2690 PURBA BARDHAMAN Burdwan Division DETAILED PROJECT REPORT FOR AUGMENTATION OF DOGACHIA PWSS FOR PROVIDING FUNCTIONAL HOUSEHOLD TAP CONNECTION (FHTC) PURBASTHALI-I BLOCK PURBA BARDHAMAN WEST BENGAL , SM/09415 Augmentation Quotation from WBSEDCL for Augmentation of Dogachia water supply scheme for Pump House No.-3 under Burdwan Division, PHE Dte. BILL/00366/2024-2025 567/JJM 23/07/2024 0 WBSEDCL 7.63 0.00 0 0
2691 PURBA BARDHAMAN Burdwan Division Augmentation of CHAMPAHATI PWSS for providing functional household tap connection FHTC in Purbasthali-I block under Burdwan Division in Purba Bardhaman District , SM/09416 Augmentation Relaying of HDPE pipeline at damaged portion at Kutirpara village within Champahati W/S Scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. (Sl No-A) Assistant Engineer ORD/000469/2021-2022 152/KSD 15/02/2022 30 P.C. CONSTRUCTION 4.84 4.85 100.21 1
2692 PURBA BARDHAMAN Burdwan Division Augmentation of CHAMPAHATI PWSS for providing functional household tap connection FHTC in Purbasthali-I block under Burdwan Division in Purba Bardhaman District , SM/09416 Augmentation Preparation of DPR for augmentation of Champahati W/S Scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. (Sl No-G) Assistant Engineer ORD/000573/2021-2022 209/KSD 23/02/2022 21 INDRANIL DUTTA & ASSOCIATES 2.70 2.71 100.37 1
2693 PURBA BARDHAMAN Burdwan Division Augmentation of CHAMPAHATI PWSS for providing functional household tap connection FHTC in Purbasthali-I block under Burdwan Division in Purba Bardhaman District , SM/09416 Augmentation Supply of materials for different water supply scheme under Burdwan Division, PHE Dte. VCH/001578/2021-2022 1207/DW 10/03/2022 0 EXECUTIVE ENGINEER, RESOURCES DIVISION, P.H.E. DTE. 3,005.00 0.00 0 0
2694 PURBA BARDHAMAN Burdwan Division Augmentation of CHAMPAHATI PWSS for providing functional household tap connection FHTC in Purbasthali-I block under Burdwan Division in Purba Bardhaman District , SM/09416 Augmentation Material Requisition To Resource Division RTOR000048/2021-2022 564/BWD 27/01/2022 0 Resource Division 10.64 0.00 0 0
2695 PURBA BARDHAMAN Burdwan Division Augmentation of CHAMPAHATI PWSS for providing functional household tap connection FHTC in Purbasthali-I block under Burdwan Division in Purba Bardhaman District , SM/09416 Augmentation Material Requisition To Resource Division RTOR000211/2021-2022 1534/BWD 15/03/2022 0 Resource Division 0.37 0.00 0 0
2696 PURBA BARDHAMAN Burdwan Division Augmentation of CHAMPAHATI PWSS for providing functional household tap connection FHTC in Purbasthali-I block under Burdwan Division in Purba Bardhaman District , SM/09416 Augmentation Material Requisition To Resource Division RTOR000103/2021-2022 950/BWD 17/02/2022 0 Resource Division 35.32 0.00 0 0
2697 PURBA BARDHAMAN Burdwan Division Augmentation of CHAMPAHATI PWSS for providing functional household tap connection FHTC in Purbasthali-I block under Burdwan Division in Purba Bardhaman District , SM/09416 Augmentation Material Requisition To Resource Division RTOR000084/2021-2022 606/BWD 28/01/2022 0 Resource Division 24.12 0.00 0 0
2698 PURBA BARDHAMAN Burdwan Division Augmentation of CHAMPAHATI PWSS for providing functional household tap connection FHTC in Purbasthali-I block under Burdwan Division in Purba Bardhaman District , SM/09416 Augmentation Material Requisition To Resource Division RTOR000040/2022-2023 4633/BWD 17/10/2022 0 Resource Division 12.32 0.00 0 0
2699 PURBA BARDHAMAN Burdwan Division Augmentation of CHAMPAHATI PWSS for providing functional household tap connection FHTC in Purbasthali-I block under Burdwan Division in Purba Bardhaman District , SM/09416 Augmentation Work Order for "Laying of Rising Main for CHAMPAHATI(SM/09416) Piped Water Supply Scheme within Kalna Sub-Division under Burdwan Division, PHE Dte." Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/001184/2023-2024 2187/KSD 15/03/2024 10 DEL DELTA CONSTRUCTION 4.82 0.00 0 2
2700 PURBA BARDHAMAN Burdwan Division Augmentation of CHAMPAHATI PWSS for providing functional household tap connection FHTC in Purbasthali-I block under Burdwan Division in Purba Bardhaman District , SM/09416 Augmentation Augmentation of CHAMPAHATI Piped Water Supply Scheme with LDS, FHTC, Rising Main, Construction of 250 Cum capacity OHR with 20.0 Mtr. Staging height inclusive of soil test with construction of boundary wall at Head works site under Kalna ¿ II Block, District - Purba Bardhaman. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000653/2021-2022 1655/BWD 22/03/2022 365 MONDAL ENTERPRISE 265.13 263.45 99.37 80
2701 PURBA BARDHAMAN Burdwan Division Augmentation of CHAMPAHATI PWSS for providing functional household tap connection FHTC in Purbasthali-I block under Burdwan Division in Purba Bardhaman District , SM/09416 Augmentation Additional works to implement the CHAMPAHATI Piped Water Supply Scheme under Purbasthali-I Block, Dist :- Purba Burdwan under Burdwan Divn., PHE. Dte. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000757/2022-2023 1270/BWD 17/03/2023 30 MONDAL ENTERPRISE 24.02 23.59 98.21 50
2702 PURBA BARDHAMAN Burdwan Division Augmentation of CHAMPAHATI PWSS for providing functional household tap connection FHTC in Purbasthali-I block under Burdwan Division in Purba Bardhaman District , SM/09416 Augmentation Additional Work of CHAMPAHATI Piped Water Supply Scheme with sinking of Tube-wells, LDSs, FHTCs, construction of switch rooms & boundary wall with gate under PURBASTHALI-I Block, District:- Purba Bardhaman._2ND CALL. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/001011/2023-2024 370/BWD 29/01/2024 245 ANWESHA CONSTRUCTION 59.07 50.44 85.39 20
2703 PURBA BARDHAMAN Burdwan Division Augmentation of CHAMPAHATI PWSS for providing functional household tap connection FHTC in Purbasthali-I block under Burdwan Division in Purba Bardhaman District , SM/09416 Augmentation Additional works for construction of OHR having capacity 250 cum in connection with Augmentation of CHAMPAHATI PWSS (SM/09416) under Purbasthali-I Block under Kalna Sub-Division, PHE Dte. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000359/2024-2025 2924/BWD 26/07/2024 90 MONDAL ENTERPRISE 27.44 0.00 0 2
2704 PURBA BARDHAMAN Burdwan Division Providing Functional House hold Tap Connection (FHTC) by retrofitting at Jotshyam, Jurepar, Kadipur, Medgachi, Muragachha, Naopara, Ramanandapur mouzas within the command area of Manikhar piped Water Supply Scheme at Mangolkote Block under Burdwan Divisio , SM/08712 Retrofitting Supply of materials for different water supply scheme under Burdwan Division, PHE Dte. VCH/001237/2021-2022 1132/DW 26/02/2022 0 EXECUTIVE ENGINEER, RESOURCES DIVISION, P.H.E. DTE. 221.00 0.00 0 0
2705 PURBA BARDHAMAN Burdwan Division Providing Functional House hold Tap Connection (FHTC) by retrofitting at Jotshyam, Jurepar, Kadipur, Medgachi, Muragachha, Naopara, Ramanandapur mouzas within the command area of Manikhar piped Water Supply Scheme at Mangolkote Block under Burdwan Divisio , SM/08712 Retrofitting Sinking of 250 X 150mm dia Tube Well 150 mtr. Depth by D.R. Rig method using UPVC pipe (CM) and UPVC Medium Well Screen (RMS) for 2nd TW Site of MANIKHAR & its adjoining mouzas Piped Water Supply Scheme, Block Kalna I, Dist - Purba Bardhaman under Burdwan Division, PHE Dte. Assistant Engineer ORD/000704/2022-2023 658/BWD 21/02/2023 30 DAS CONSTRUCTION 8.72 8.14 93.35 1
2706 PURBA BARDHAMAN Burdwan Division Providing Functional House hold Tap Connection (FHTC) by retrofitting at Jotshyam, Jurepar, Kadipur, Medgachi, Muragachha, Naopara, Ramanandapur mouzas within the command area of Manikhar piped Water Supply Scheme at Mangolkote Block under Burdwan Divisio , SM/08712 Retrofitting Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of MANIKHAR Piped Water Supply Scheme at Kalna-I Block under Burdwan Division, PHE Dte. (Agreement No. 47/2020-2021 OF SE/CC/PHE. DTE.) Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000113/2020-2021 4787/BWD 02/12/2020 90 H SAMANTA 96.04 74.56 77.63 1
2707 PURBA BARDHAMAN Burdwan Division Providing Functional House hold Tap Connection (FHTC) by retrofitting at Jotshyam, Jurepar, Kadipur, Medgachi, Muragachha, Naopara, Ramanandapur mouzas within the command area of Manikhar piped Water Supply Scheme at Mangolkote Block under Burdwan Divisio , SM/08712 Retrofitting Material Requisition To Resource Division RTOR000119/2021-2022 1112/BWD 26/02/2022 0 Resource Division 28.05 0.00 0 0
2708 PURBA BARDHAMAN Burdwan Division Providing Functional House hold Tap Connection (FHTC) by retrofitting at Jotshyam, Jurepar, Kadipur, Medgachi, Muragachha, Naopara, Ramanandapur mouzas within the command area of Manikhar piped Water Supply Scheme at Mangolkote Block under Burdwan Divisio , SM/08712 Retrofitting Digital structurization of pipeline alignment and asset evaluation including holistic design, preparation of design drawings of overall LDS & preparation of estimate for 11 Nos. Piped W/S. Schemes under Kalna I Block under Kalna Sub-Division under Burdwan Division, PHE. Dte. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000335/2024-2025 3015/BWD 05/08/2024 60 HORIZEN 29.60 7.40 25 10
2709 PURBA BARDHAMAN Burdwan Division Augmentation of ground water based NABABHAT PWSS to accommodate FHTC in BURDWAN-I block under Burdwan Sub Division of Burdwan Division in Purba Bardhaman District , SM/09489 Augmentation Route Survey & Preparation of DPR for Nababhat W/S Scheme under Burdwan-I Block under Burdwan Sub-Division under Burdwan Division PHE Dte. Sl. No.14. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000503/2021-2022 189/BSD 31/01/2022 30 RADIANT 2.87 2.86 99.65 1
2710 PURBA BARDHAMAN Burdwan Division Augmentation of ground water based NABABHAT PWSS to accommodate FHTC in BURDWAN-I block under Burdwan Sub Division of Burdwan Division in Purba Bardhaman District , SM/09489 Augmentation Supply of materials for different water supply scheme under Burdwan Division, PHE Dte. VCH/001578/2021-2022 1207/DW 10/03/2022 0 EXECUTIVE ENGINEER, RESOURCES DIVISION, P.H.E. DTE. 3,005.00 0.00 0 0
2711 PURBA BARDHAMAN Burdwan Division Augmentation of ground water based NABABHAT PWSS to accommodate FHTC in BURDWAN-I block under Burdwan Sub Division of Burdwan Division in Purba Bardhaman District , SM/09489 Augmentation Sinking of 300 X 200mm dia Tube Well 150 mtr. Depth by D.R. Rig method using UPVC pipe (CM) and UPVC Medium Well Screen (RMS) for Augmentation of NABABHAT & its adjoining mouzas Piped Water Supply Scheme, Block - Burdwan - I, Dist - Purba Bardhaman under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000552/2022-2023 5194/BWD 24/11/2022 30 ANIRUDDHA FARUQUE 11.24 9.61 85.5 1
2712 PURBA BARDHAMAN Burdwan Division Augmentation of ground water based NABABHAT PWSS to accommodate FHTC in BURDWAN-I block under Burdwan Sub Division of Burdwan Division in Purba Bardhaman District , SM/09489 Augmentation Construction of boundary wall at East side of Nababhat PHE Complex Burdwan Division, PHE Dte. (Length-106.0Mtr, Col-37 Nos.) Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000431/2021-2022 4664/BWD 10/09/2021 30 MANAS KUMAR CHATTERJEE 7.89 8.03 101.77 1
2713 PURBA BARDHAMAN Burdwan Division Augmentation of ground water based NABABHAT PWSS to accommodate FHTC in BURDWAN-I block under Burdwan Sub Division of Burdwan Division in Purba Bardhaman District , SM/09489 Augmentation Land Development at East Side of Office Building under Nababhat PHE Complex under Burdwan Sub-Division in Burdwan Division,PHE Dte. Gr.D. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000466/2021-2022 277/BSD 15/02/2022 30 MANAS KUMAR CHATTERJEE 3.17 3.17 100 1
2714 PURBA BARDHAMAN Burdwan Division Augmentation of ground water based NABABHAT PWSS to accommodate FHTC in BURDWAN-I block under Burdwan Sub Division of Burdwan Division in Purba Bardhaman District , SM/09489 Augmentation Supply and delivery of different dia. CIDF sluice valve for Augmentation of Paharhati, Nababhat, Shyamsundar & Dewandighi-Mirzapur Piped Water Supply Scheme within Burdwan Sub-Division under Burdwan Division, P.H.E. Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000519/2022-2023 4703/BWD 19/10/2022 20 SSPR VALVE MANUFACTURING PVT LTD. 14.45 3.61 24.98 1
2715 PURBA BARDHAMAN Burdwan Division Augmentation of ground water based NABABHAT PWSS to accommodate FHTC in BURDWAN-I block under Burdwan Sub Division of Burdwan Division in Purba Bardhaman District , SM/09489 Augmentation Wall Painting at East Side Boundary Wall of Nababhat PHE Complex for IEC Programme for FHTC WORK under Burdwan Sub-Division, PHE Dte. Gr. A. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000507/2022-2023 1067/BSD 27/06/2022 7 FIVE HURDS ENGINEERING FARM 0.40 0.39 97.5 1
2716 PURBA BARDHAMAN Burdwan Division Augmentation of ground water based NABABHAT PWSS to accommodate FHTC in BURDWAN-I block under Burdwan Sub Division of Burdwan Division in Purba Bardhaman District , SM/09489 Augmentation Construction of boundary wall (with main gate) at west side of Nababhat PHE complex of Augmentation of Nababhat under Burdwan Division, PHE Dte. (Length-110 Mtr, Col-45 Nos.) Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000935/2021-2022 6254/BWD 01/11/2021 30 SUROVI CONSTRUCTION AND GENERAL ORDER SUPPLIERS 7.05 6.59 93.48 0
2717 PURBA BARDHAMAN Burdwan Division Augmentation of ground water based NABABHAT PWSS to accommodate FHTC in BURDWAN-I block under Burdwan Sub Division of Burdwan Division in Purba Bardhaman District , SM/09489 Augmentation Material Requisition To Resource Division RTOR000162/2021-2022 1322/BWD 08/03/2022 0 Resource Division 12.13 0.00 0 0
2718 PURBA BARDHAMAN Burdwan Division Augmentation of ground water based NABABHAT PWSS to accommodate FHTC in BURDWAN-I block under Burdwan Sub Division of Burdwan Division in Purba Bardhaman District , SM/09489 Augmentation Material Requisition To Resource Division RTOR000155/2021-2022 1238/BWD 07/03/2022 0 Resource Division 4.19 0.00 0 0
2719 PURBA BARDHAMAN Burdwan Division Augmentation of ground water based NABABHAT PWSS to accommodate FHTC in BURDWAN-I block under Burdwan Sub Division of Burdwan Division in Purba Bardhaman District , SM/09489 Augmentation Material Requisition To Resource Division RTOR000061/2021-2022 544/BWD 27/01/2022 0 Resource Division 25.82 0.00 0 0
2720 PURBA BARDHAMAN Burdwan Division Augmentation of ground water based NABABHAT PWSS to accommodate FHTC in BURDWAN-I block under Burdwan Sub Division of Burdwan Division in Purba Bardhaman District , SM/09489 Augmentation Material Requisition To Resource Division RTOR000214/2021-2022 1537/BWD 15/03/2022 0 Resource Division 0.37 0.00 0 0
2721 PURBA BARDHAMAN Burdwan Division Augmentation of ground water based NABABHAT PWSS to accommodate FHTC in BURDWAN-I block under Burdwan Sub Division of Burdwan Division in Purba Bardhaman District , SM/09489 Augmentation Augmentation of NABABHAT Piped Water Supply Scheme with LDS, FHTC, Rising Main, Construction of 450 Cum capacity OHR with 20.0 Mtr. Staging height inclusive of soil investigation & repairing of Pump House at Head works & 2nd TW site under Burdwan I Block, District - Purba Bardhaman. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. Junior Engineer, Burdwan Sadar Sub-Division ORD/000016/2022-2023 1964/BWD 12/04/2022 1085 S.P. CONSTRUCTION 514.15 442.02 85.97 100
2722 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED KAITHAN PWSS TO ACCOMMODATE FHTC IN KATWA-I BLOCK UNDER KATWA SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/09568 Augmentation Route Survey and preparation of DPR for KAITHAN PWSS under Katwa-I & II Block under Katwa Sub-Division under Burdwan Division PHE Dte. [Sl No-02] Assistant Engineer ORD/000538/2021-2022 45/KTS 24/01/2022 21 RADIANT 2.59 2.59 100 1
2723 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED KAITHAN PWSS TO ACCOMMODATE FHTC IN KATWA-I BLOCK UNDER KATWA SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/09568 Augmentation Supply of materials for different water supply scheme under Burdwan Division, PHE Dte. VCH/001578/2021-2022 1207/DW 10/03/2022 0 EXECUTIVE ENGINEER, RESOURCES DIVISION, P.H.E. DTE. 3,005.00 0.00 0 0
2724 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED KAITHAN PWSS TO ACCOMMODATE FHTC IN KATWA-I BLOCK UNDER KATWA SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/09568 Augmentation Supply and delivery of different dia. CIDF sluice valve for Augmentation of Baharan-Birampur, Kaithan, Majhigram-Sigot & Ketugram (Zone-I & II) Piped Water Supply Scheme within Katwa Sub-Division under Burdwan Division, P.H.E. Dte. Assistant Engineer ORD/000518/2022-2023 4702/BWD 19/10/2022 20 SSPR VALVE MANUFACTURING PVT LTD. 14.45 7.22 49.97 1
2725 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED KAITHAN PWSS TO ACCOMMODATE FHTC IN KATWA-I BLOCK UNDER KATWA SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/09568 Augmentation Material Requisition To Resource Division RTOR000164/2021-2022 1324/BWD 08/03/2022 0 Resource Division 17.01 0.00 0 0
2726 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED KAITHAN PWSS TO ACCOMMODATE FHTC IN KATWA-I BLOCK UNDER KATWA SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/09568 Augmentation Material Requisition To Resource Division RTOR000182/2021-2022 1377/BWD 09/03/2022 0 Resource Division 4.13 0.00 0 0
2727 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED KAITHAN PWSS TO ACCOMMODATE FHTC IN KATWA-I BLOCK UNDER KATWA SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/09568 Augmentation Material Requisition To Resource Division RTOR000057/2021-2022 547/BWD 27/01/2022 0 Resource Division 17.27 0.00 0 0
2728 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED KAITHAN PWSS TO ACCOMMODATE FHTC IN KATWA-I BLOCK UNDER KATWA SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/09568 Augmentation Material Requisition To Resource Division RTOR000231/2021-2022 1542/BWD 15/03/2022 0 Resource Division 0.37 0.00 0 0
2729 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED KAITHAN PWSS TO ACCOMMODATE FHTC IN KATWA-I BLOCK UNDER KATWA SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/09568 Augmentation Material Requisition To Resource Division RTOR000112/2021-2022 1089/BWD 25/02/2022 0 Resource Division 32.22 0.00 0 0
2730 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED KAITHAN PWSS TO ACCOMMODATE FHTC IN KATWA-I BLOCK UNDER KATWA SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/09568 Augmentation Augmentation of KAITHAN Piped Water Supply Scheme with LDS, FHTC, Rising Main, Construction of 350 Cum capacity OHR with 20.0 Mtr. Staging height inclusive of soil investigation including repairing of pump house at Head Works & 2nd TW site under Katwa ¿ I Block, District - Purba Bardhaman. Assistant Engineer JUNIOR ENGINEER KATWA SUB-DIVISION PHE DTE ORD/000018/2022-2023 2007/BWD 13/04/2022 365 VISHAL CONSTRUCTION CO. 365.96 348.32 95.18 95
2731 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED KAITHAN PWSS TO ACCOMMODATE FHTC IN KATWA-I BLOCK UNDER KATWA SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/09568 Augmentation Construction of Boundary Wall at Head Work site of KAITHAN PWSS under Katwa-I Block under Katwa Sub-Division within Burdwan Sub-Division PHE Dte. Assistant Engineer JUNIOR ENGINEER KATWA SUB-DIVISION PHE DTE ORD/000856/2023-2024 5200/BWD 29/11/2023 30 SUBODH KUMAR MONDAL 22.82 0.00 0 75
2732 PURBA BARDHAMAN Burdwan Division Augmentation of Ground Water based Piped Water Supply Scheme for BHATAKUL (Zone-I & II) to accommodate FHTC under Jal Sapno Mission under Bhatar Block in Purba Bardhaman District under Burdwan Division, P.H.E. DTE. , SM/09715 Augmentation Route Survey & Preparation of DPR for BHATAKUL PWSS under Durgapur(Bardhaman North) Sub-Division under Burdwan Division PHE Dte.[SL-F] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000657/2021-2022 106/DSD 18/02/2022 15 SIRCON ENGINEERING SERVICES 2.63 2.63 100 1
2733 PURBA BARDHAMAN Burdwan Division Augmentation of Ground Water based Piped Water Supply Scheme for BHATAKUL (Zone-I & II) to accommodate FHTC under Jal Sapno Mission under Bhatar Block in Purba Bardhaman District under Burdwan Division, P.H.E. DTE. , SM/09715 Augmentation Supply of materials for different water supply schemes under Burdwan Division, PHE Dte. VCH/001555/2021-2022 1194/DW 10/03/2022 0 EXECUTIVE ENGINEER, RESOURCES DIVISION, P.H.E. DTE. 62.76 0.00 0 0
2734 PURBA BARDHAMAN Burdwan Division Augmentation of Ground Water based Piped Water Supply Scheme for BHATAKUL (Zone-I & II) to accommodate FHTC under Jal Sapno Mission under Bhatar Block in Purba Bardhaman District under Burdwan Division, P.H.E. DTE. , SM/09715 Augmentation Shifting of 25 KVA S/STN with Selenda 11KV HTOH Line from the premises of Bhatakul PWSS under Burdwan Division, PHE Dte. VCH/000653/2022-2023 550/DW/22-23 13/09/2022 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LTD. 2.43 0.00 0 0
2735 PURBA BARDHAMAN Burdwan Division Augmentation of Ground Water based Piped Water Supply Scheme for BHATAKUL (Zone-I & II) to accommodate FHTC under Jal Sapno Mission under Bhatar Block in Purba Bardhaman District under Burdwan Division, P.H.E. DTE. , SM/09715 Augmentation Supply of materials for different water supply scheme under Burdwan Division, PHE Dte. VCH/001578/2021-2022 1207/DW 10/03/2022 0 EXECUTIVE ENGINEER, RESOURCES DIVISION, P.H.E. DTE. 3,005.00 0.00 0 0
2736 PURBA BARDHAMAN Central Mechanical Augmentation of Ground Water based Piped Water Supply Scheme for BHATAKUL (Zone-I & II) to accommodate FHTC under Jal Sapno Mission under Bhatar Block in Purba Bardhaman District under Burdwan Division, P.H.E. DTE. , SM/09715 Augmentation Supply & Installation of Submersible Pumping Machinery , Voltage Stabilizer, Chlorination system and internal House wiring for Tube well no.- 1 at Augmentation of Bhatakul (Zone-I) Water Supply Scheme under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER ORD/000620/2022-2023 2093/CMD 08/09/2022 30 CHOUDHURY ENTERPRISE 10.82 10.73 99.17 1
2737 PURBA BARDHAMAN Burdwan Division Augmentation of Ground Water based Piped Water Supply Scheme for BHATAKUL (Zone-I & II) to accommodate FHTC under Jal Sapno Mission under Bhatar Block in Purba Bardhaman District under Burdwan Division, P.H.E. DTE. , SM/09715 Augmentation Construction of Drum Sheet Walling and Approach road to HW site for Augmentation of Bhatakul (Zone-I ) Piped water supply Scheme , P.H.E Dte. Block:-Bhatar, Dist: Purba Bardhaman. SL-13 Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer2, Durgapur Sub-Division, PHE Dte. ORD/000534/2022-2023 653/DSD 03/11/2022 30 NANGTASWAR CO. OP. LABOUR CONT. AND CONSTRUCTION SOCIETY LTD. 2.99 2.99 100 100
2738 PURBA BARDHAMAN Central Mechanical Augmentation of Ground Water based Piped Water Supply Scheme for BHATAKUL (Zone-I & II) to accommodate FHTC under Jal Sapno Mission under Bhatar Block in Purba Bardhaman District under Burdwan Division, P.H.E. DTE. , SM/09715 Augmentation Restoration of power line for New Well No. 1 at Bhatakul (Zone - I) Water Supply Scheme, under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER ORD/000781/2022-2023 1370/CMSD - I 30/12/2022 15 CHOUDHURY ENTERPRISE 1.66 1.66 100 1
2739 PURBA BARDHAMAN Burdwan Division Augmentation of Ground Water based Piped Water Supply Scheme for BHATAKUL (Zone-I & II) to accommodate FHTC under Jal Sapno Mission under Bhatar Block in Purba Bardhaman District under Burdwan Division, P.H.E. DTE. , SM/09715 Augmentation Material Requisition To Resource Division RTOR000030/2021-2022 548/BWD 27/01/2022 0 Resource Division 9.39 0.00 0 0
2740 PURBA BARDHAMAN Burdwan Division Augmentation of Ground Water based Piped Water Supply Scheme for BHATAKUL (Zone-I & II) to accommodate FHTC under Jal Sapno Mission under Bhatar Block in Purba Bardhaman District under Burdwan Division, P.H.E. DTE. , SM/09715 Augmentation Material Requisition To Resource Division RTOR000220/2021-2022 1543/BWD 15/03/2022 0 Resource Division 0.37 0.00 0 0
2741 PURBA BARDHAMAN Burdwan Division Augmentation of Ground Water based Piped Water Supply Scheme for BHATAKUL (Zone-I & II) to accommodate FHTC under Jal Sapno Mission under Bhatar Block in Purba Bardhaman District under Burdwan Division, P.H.E. DTE. , SM/09715 Augmentation Material Requisition To Resource Division RTOR000192/2021-2022 1374/BWD 09/03/2022 0 Resource Division 3.83 0.00 0 0
2742 PURBA BARDHAMAN Burdwan Division Augmentation of Ground Water based Piped Water Supply Scheme for BHATAKUL (Zone-I & II) to accommodate FHTC under Jal Sapno Mission under Bhatar Block in Purba Bardhaman District under Burdwan Division, P.H.E. DTE. , SM/09715 Augmentation Material Requisition To Resource Division RTOR000172/2021-2022 1338/BWD 08/03/2022 0 Resource Division 56.67 0.00 0 0
2743 PURBA BARDHAMAN Burdwan Division Augmentation of Ground Water based Piped Water Supply Scheme for BHATAKUL (Zone-I & II) to accommodate FHTC under Jal Sapno Mission under Bhatar Block in Purba Bardhaman District under Burdwan Division, P.H.E. DTE. , SM/09715 Augmentation Material Requisition To Resource Division RTOR000100/2021-2022 768/BWD 07/02/2022 0 Resource Division 38.41 0.00 0 0
2744 PURBA BARDHAMAN Burdwan Division Augmentation of Ground Water based Piped Water Supply Scheme for BHATAKUL (Zone-I & II) to accommodate FHTC under Jal Sapno Mission under Bhatar Block in Purba Bardhaman District under Burdwan Division, P.H.E. DTE. , SM/09715 Augmentation Material Requisition To Resource Division RTOR000020/2022-2023 3276/BWD 29/07/2022 0 Resource Division 69.15 0.00 0 0
2745 PURBA BARDHAMAN Burdwan Division Augmentation of Ground Water based Piped Water Supply Scheme for BHATAKUL (Zone-I & II) to accommodate FHTC under Jal Sapno Mission under Bhatar Block in Purba Bardhaman District under Burdwan Division, P.H.E. DTE. , SM/09715 Augmentation Sinking of 300 X 200mm dia Tube Well 200 mtr. Depth by D.R. Rig method using UPVC pipe (CD) and UPVC Deep Well Screen (RDS) at 1st & 2nd Tubewell site for Augmentation of BHATAKUL (Zone-I & II) Piped Water Supply Scheme, Block - Bhatar, Dist - Purba Bardhaman under Burdwan Division, PHE Dte. [2 Nos. GTW]. Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer2, Durgapur Sub-Division, PHE Dte. ORD/000014/2022-2023 1962/BWD 12/04/2022 45 ACME CONSTRUCTION 22.05 16.19 73.42 100
2746 PURBA BARDHAMAN Burdwan Division Augmentation of Ground Water based Piped Water Supply Scheme for BHATAKUL (Zone-I & II) to accommodate FHTC under Jal Sapno Mission under Bhatar Block in Purba Bardhaman District under Burdwan Division, P.H.E. DTE. , SM/09715 Augmentation Augmentation of BHATAKUL Piped Water Supply Scheme (Zone - I & II) including Laying Distribution System, Functional Household Tap Connection, Pumping Main, 350 Cum capacity Over Head Reservoir with 20 Mtr. staging height (including Soil Testing), Switch Room with sanitary arrangement, construction of Boundary wall in Head work site and repairing of pump house at Bhatar Block in under Burdwan Division, PHE. Dte. Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer2, Durgapur Sub-Division, PHE Dte. ORD/000398/2021-2022 277/BWD 14/01/2022 657 SATYANARAYAN ENGINEERS CO. OP. SOCIETY LTD. 351.08 206.56 58.84 100
2747 PURBA BARDHAMAN Burdwan Division Augmentation of Ground Water based Piped Water Supply Scheme for BHATAKUL (Zone-I & II) to accommodate FHTC under Jal Sapno Mission under Bhatar Block in Purba Bardhaman District under Burdwan Division, P.H.E. DTE. , SM/09715 Augmentation Quotation from WBSEDCL for Augmentation of Bhatakul Zone-2 water supply scheme for P.H.-2 under Burdwan Division, PHE Dte. BILL/00390/2024-2025 536/JJM 18/07/2024 0 WBSEDCL 11.79 0.00 0 0
2748 PURBA BARDHAMAN Central Mechanical Augmentation of Ground Water based Piped Water Supply Scheme for BHATAKUL (Zone-I & II) to accommodate FHTC under Jal Sapno Mission under Bhatar Block in Purba Bardhaman District under Burdwan Division, P.H.E. DTE. , SM/09715 Augmentation Quotation for new service connection for Bhatakul PWSS Zone-2, PH-2. BILL/00309/2024-2025 19/06/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 11.79 0.00 0 0
2749 PURBA BARDHAMAN Burdwan Division AGUMENTATION OF GROUND WATER BASED SATGACHIA ZONE II PWSS TO ACCOMMODATE FHTC IN MEMARI-II BLOCK UNDER BURDWAN SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/10060 Augmentation Route Survey & Preparation of DPR for Satgachia (Zone-I) & (Zone-II) W/S Scheme under Memari-II Block under Burdwan Sub-Division under Burdwan Division PHE Dte. Sl No.4. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000492/2021-2022 179/BSD 31/01/2022 30 RADIANT 4.21 2.10 49.88 1
2750 PURBA BARDHAMAN Burdwan Division AGUMENTATION OF GROUND WATER BASED SATGACHIA ZONE II PWSS TO ACCOMMODATE FHTC IN MEMARI-II BLOCK UNDER BURDWAN SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/10060 Augmentation Restoration work due to laying of 160 mm, 140 mm dia HDPE pipe along with Bardhaman Kalna Road from 31.00kmp to 32.00 kmp with sand filling, GSB, WBM & BM and shoulder portion jhama with moorum consolidation of Augmentation of Satgachia Zone-II water supply scheme "JAL JEEVAN MISSION" under Burdwan Division, PHE Dte. BILL/00097/2023-2024 195/JJM 31/05/2023 0 EXECUTIVE ENGINEER PWD BURDWAN DIVISION 27.42 0.00 0 0
2751 PURBA BARDHAMAN Burdwan Division AGUMENTATION OF GROUND WATER BASED SATGACHIA ZONE II PWSS TO ACCOMMODATE FHTC IN MEMARI-II BLOCK UNDER BURDWAN SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/10060 Augmentation Relaying of damaged pipeline of 90mm HDPE pipeline for FHTC work & shifiting of sluice valve chamber for Road culvert work from Zilla parisad at Satgachia zone-II Piped Water Supply Scheme within Memari-II block under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000510/2024-2025 1857/BSD 22/08/2024 30 D.M. ENTERPRISE 0.93 0.92 98.92 100
2752 PURBA BARDHAMAN Burdwan Division AGUMENTATION OF GROUND WATER BASED SATGACHIA ZONE II PWSS TO ACCOMMODATE FHTC IN MEMARI-II BLOCK UNDER BURDWAN SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/10060 Augmentation Different Types of work involved in connection with different Augmentation & Retrofitting Schemes (06 Nos.) Piped Water Supply Scheme under Memari II Block within Burdwan Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/001269/2024-2025 848/BWD 05/03/2025 120 PROJECT INDIA 394.29 0.00 0 0
2753 PURBA BARDHAMAN Burdwan Division AGUMENTATION OF GROUND WATER BASED SATGACHIA ZONE I PWSS TO ACCOMMODATE FHTC IN MEMARI-II BLOCK UNDER BURDWAN SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/10061 Augmentation Route Survey & Preparation of DPR for Satgachia (Zone-I) & (Zone-II) W/S Scheme under Memari-II Block under Burdwan Sub-Division under Burdwan Division PHE Dte. Sl No.4. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000492/2021-2022 179/BSD 31/01/2022 30 RADIANT 4.21 2.10 49.88 1
2754 PURBA BARDHAMAN Burdwan Division AGUMENTATION OF GROUND WATER BASED SATGACHIA ZONE I PWSS TO ACCOMMODATE FHTC IN MEMARI-II BLOCK UNDER BURDWAN SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/10061 Augmentation Restoration work of Debipur-Bulbulitala Road from 15.00 km to 17.10 km (in stretches) damage due to laying of underground water pipeline by PHE with box cutting and jhama with moorum consolidation under Kalna Highway Sub-Division of Burdwan South Highway Division, P.W. Roads Dte. during the Year 2023-2024. BILL/01173/2023-2024 1079/JJM 20/12/2023 0 EXECUTIVE ENGINEER BURDWAN SOUTH HIGHWAY DIVISION P.W. (ROADS) DTE. 5.51 0.00 0 0
2755 PURBA BARDHAMAN Burdwan Division AGUMENTATION OF GROUND WATER BASED SATGACHIA ZONE I PWSS TO ACCOMMODATE FHTC IN MEMARI-II BLOCK UNDER BURDWAN SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/10061 Augmentation Construction of switch rooms & Rising main at different TW site for SATGACHIA (Zone-I) Piped Water Supply Scheme under Memari - II Block, District:- Purba-Bardhaman under Burdwan Division, PHE. Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000535/2023-2024 3632/BWD 21/08/2023 60 ROY ASSOCIATE 9.08 7.65 84.25 100
2756 PURBA BARDHAMAN Burdwan Division AGUMENTATION OF GROUND WATER BASED SATGACHIA ZONE I PWSS TO ACCOMMODATE FHTC IN MEMARI-II BLOCK UNDER BURDWAN SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/10061 Augmentation Augmentation of SATGACHIA (Zone-I) Piped Water Supply Scheme with LDS, FHTC, Rising main, Construction of 500 cum capacity OHR with 20.0 mtr. Staging height inclusive of soil investigation under MEMARI- II Block, District:- Purba-Burdwan. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000156/2022-2023 3123/BWD 18/07/2022 1171 M/S ASHA CONSTRUCTION 544.27 421.18 77.38 85
2757 PURBA BARDHAMAN Burdwan Division AGUMENTATION OF GROUND WATER BASED SATGACHIA ZONE I PWSS TO ACCOMMODATE FHTC IN MEMARI-II BLOCK UNDER BURDWAN SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/10061 Augmentation Different Types of work involved in connection with different Augmentation & Retrofitting Schemes (06 Nos.) Piped Water Supply Scheme under Memari II Block within Burdwan Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/001269/2024-2025 848/BWD 05/03/2025 120 PROJECT INDIA 394.29 0.00 0 0
2758 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting at Palasan PWSS , SM/06772 Retrofitting Providing Functional Household tap connection (FHTC) from existing distribution system within the command area of PALASON piped water supply scheme at Raina-I Block under Burdwan Division, PHE Dte._2nd call. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000678/2020-2021 1409/BWD 18/02/2021 60 S.S. ENTERPRISE 72.41 71.05 98.12 1
2759 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting at Palasan PWSS , SM/06772 Retrofitting Interconnection between Raising Main to OHR & OHR to distribution System with bypass arrangement for Palason Water Supply Scheme within Raina-I Block under Burdwan Division, PHE Dte._2ND CALL Gr.E. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000467/2021-2022 278/BSD 15/02/2022 30 S.S. ENTERPRISE 3.23 0.00 0 1
2760 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting at Palasan PWSS , SM/06772 Retrofitting Construction of concrete road and rest portion of Boundary Wall at Head Works Site of PALASON Water Supply Scheme under Raina-I Block of Burdwan Division,PHE Dte(Length-48.00 Mtr,Col-16 Nos)[Front Side]Gr.F. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000490/2021-2022 279/BSD 15/02/2022 45 NEW MANGES INDUSTRIAL CORPORATION 4.12 4.17 101.21 1
2761 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of NABASTHA Piped Water Supply Scheme , SM/07864 Retrofitting Providing Functional Household tap connection (FHTC) from existing distribution system within the command area of NABASTHA piped water supply scheme at Begut, Bodhpur, Chakundi, Nabastha & Palsha village, Burdwan-II Block under Burdwan Division, PHE Dte.[Tr No.-65/BWD/20-21] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000385/2020-2021 5003/BWD 10/12/2020 90 M/S ASHA CONSTRUCTION 88.60 70.86 79.98 1
2762 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of NABASTHA Piped Water Supply Scheme , SM/07864 Retrofitting Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of Nabastha Piped Water Supply Scheme at Saligram (9 Nos Habitation) Village (Mouza), Burdwan-II Block under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000040/2021-2022 3447/BWD 29/06/2021 30 PAL CONSTRUCTION 19.73 19.19 97.26 1
2763 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of NABASTHA Piped Water Supply Scheme , SM/07864 Retrofitting Providing FHTC from existing distribution pipe line system within command area of Nabastha Piped W/S. Scheme at Chakundi- Mouza, Bardhaman-II Development Block under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000162/2022-2023 3138/BWD 19/07/2022 30 BABUL SK 11.86 12.12 102.19 1
2764 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of NABASTHA Piped Water Supply Scheme , SM/07864 Retrofitting Construction of boundary wall at Head works site of NABASTHA Piped Water Supply Scheme in Burdwan-II Block under Burdwan Division, PHE Dte. (Length - 154 Mtr., 69 Nos Column). Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000097/2022-2023 2742/BWD 08/06/2022 30 MOYAZZEM CONSTRUCTION 10.54 10.01 94.97 1
2765 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of NABASTHA Piped Water Supply Scheme , SM/07864 Retrofitting Providing leftout water tap connection in different villages for 100% coverage in Sajal Gram from existing distribution system within scheme jurisdiction of different Piped Water Supply Schemes within Burdwan ¿ II Block under Burdwan Division, PHE. Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000416/2021-2022 385/BWD 20/01/2022 30 BISWAS ENTERPRISE 11.97 0.00 0 100
2766 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of NABASTHA Piped Water Supply Scheme , SM/07864 Retrofitting Speacial repairing and replace damaged pipe line from Nabastha bus stand to saligram & chakundi village of Nabastha piped water supply scheme at Bardhhaman-II Block under Burdwan Div., PHE Dte.Gr.A. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000643/2021-2022 467/BSD 21/03/2022 30 SETH ENTERPRISE 4.82 4.77 98.96 1
2767 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of NABASTHA Piped Water Supply Scheme , SM/07864 Retrofitting Providing FHTC in Chakundi, Nabastha & Saligram village for 100% coverage in Sajal Gram from existing distribution system within NABASTHA PWSS, Bardhhaman-II Development Block under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000013/2023-2024 1728/BWD 13/04/2023 30 KAUSHIK RAY 23.96 23.87 99.62 100
2768 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of NABASTHA Piped Water Supply Scheme , SM/07864 Retrofitting Laying of distribution system of different damaged section at Begut, Nabastha & Palsha village regarding smooth running FHTC work within Nabastha PWSS, Bardhhaman-II Development Block under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. Junior Engineer, Burdwan Sadar Sub-Division ORD/000136/2023-2024 784/BSD 28/04/2023 30 D.M. ENTERPRISE 0.95 0.94 98.95 100
2769 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of NABASTHA Piped Water Supply Scheme , SM/07864 Retrofitting Hire & fuel charges of vehicle (Car No.-WB-04H-9111) for the office of the Superintending Engineer, Central Circle, PHE Dte. for the month of December'22 & January'23. BILL/00469/2022-2023 1116/JJM 27/02/2023 0 SOURAV JANA 0.80 0.00 0 0
2770 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of NABASTHA Piped Water Supply Scheme , SM/07864 Retrofitting Hire & fuel charges of vehicle (Car No.-WB-41J-6795) for the office of the Deputy Superintending Engineer, Central Circle, PHE Dte. for the month of March to May'23. BILL/00461/2023-2024 430/JJM 25/07/2023 0 MD HASIN 1.04 0.00 0 0
2771 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of NABASTHA Piped Water Supply Scheme , SM/07864 Retrofitting Preparation and Submission of DPR for Augmentation of Ground Water Based Piped Water Supply Scheme for NABASTHA, Block:Burdwan-II under Burdwan Division, P.H.E Dte. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000987/2024-2025 1908/BSD 28/08/2024 15 MEASURE LAND 0.78 0.00 0 0
2772 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of NABASTHA Piped Water Supply Scheme , SM/07864 Retrofitting Laying of interconnection between 4th tube well to OHR for Nabastha Water Supply Scheme within Burdhaman-II Block , under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. Junior Engineer, Burdwan Sadar Sub-Division ORD/000807/2022-2023 430/BSD 15/03/2023 30 D.M. ENTERPRISE 0.91 0.67 73.63 100
2773 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of NABASTHA Piped Water Supply Scheme , SM/07864 Retrofitting Designing,making and erection of Sign Board for SWAJAL GRAM in Khargram village of Burdwan-II Block under Nabastha Piped Water Supply Scheme within Burdwan Sub-Division under Burdwan Division,PHE Dte (5 Nos. Board) Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. Junior Engineer, Burdwan Sadar Sub-Division ORD/000446/2025-2026 2309/BSD 19/08/2025 10 MANABSEBA PROKALPA & CONSTRUCTIONS 0.72 0.00 0 100
2774 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of NABASTHA Piped Water Supply Scheme , SM/07864 Retrofitting Designing, making and erection of Sign Board for SWAJAL GRAM in Karanda village of Burdwan-II Block under Nabastha Piped Water Supply Scheme within Burdwan Sub-Division under Burdwan Division, PHE Dte. (5 nos. Board) Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. Junior Engineer, Burdwan Sadar Sub-Division ORD/000492/2025-2026 2362/BSD 21/08/2025 10 MANABSEBA PROKALPA & CONSTRUCTIONS 0.72 0.00 0 100
2775 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of NABASTHA Piped Water Supply Scheme , SM/07864 Retrofitting Designing, making and erection of Sign Board for SWAJAL GRAM in Belut village of Burdwan-II Block under Nabastha Piped Water Supply Scheme within Burdwan Sub-Division under Burdwan Division, PHE Dte. (5 nos Board) Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. Junior Engineer, Burdwan Sadar Sub-Division ORD/000493/2025-2026 2363/BSD 21/08/2025 10 MANABSEBA PROKALPA & CONSTRUCTIONS 0.72 0.00 0 100
2776 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of NABASTHA Piped Water Supply Scheme , SM/07864 Retrofitting Providing FHTC for 100% coverage at Palsha (30 nos) & Begut (13nos) and special repairing of Nabastha, Begut & Palsha village for Nabastha Piped W/S scheme , Bardhhaman-II Dev. Block under Burdwan Division, PHE Dte" Gr.C. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. Junior Engineer, Burdwan Sadar Sub-Division ORD/000366/2022-2023 1405/BSD 10/08/2022 212 M/S ASHA CONSTRUCTION 4.71 0.00 0 100
2777 PURBA BARDHAMAN Jamalpur Burdwan Division GROUND WATER BASED KALERA PIPED WATER SUPPLY SCHEME JAMALPUR BLOCK PURBA BARDHAMAN , SM/11491 New Material Requisition To Resource Division RTOR000053/2022-2023 5522/BWDQ 23/12/2022 0 Resource Division 8.88 0.00 0 0
2778 PURBA BARDHAMAN Jamalpur Central Mechanical GROUND WATER BASED KALERA PIPED WATER SUPPLY SCHEME JAMALPUR BLOCK PURBA BARDHAMAN , SM/11491 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 at Kalera Water Supply Scheme [ Block- Jamalpur ] under CMD, PHE Dte., Dist.- Purba-Bardhaman ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000609/2022-2023 3115/CMD 23/11/2022 30 P.K. ENGINEERING 11.07 10.73 96.93 80
2779 PURBA BARDHAMAN Jamalpur Central Mechanical GROUND WATER BASED KALERA PIPED WATER SUPPLY SCHEME JAMALPUR BLOCK PURBA BARDHAMAN , SM/11491 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-2 at Kalera Water Supply Scheme [ Block- Jamalpur ] under CMD, PHE Dte., Dist.- Purba-Bardhaman ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000610/2022-2023 3116/CMD 23/11/2022 30 DUTTA ENTERPRISE 11.08 7.74 69.86 80
2780 PURBA BARDHAMAN Jamalpur Central Drilling GROUND WATER BASED KALERA PIPED WATER SUPPLY SCHEME JAMALPUR BLOCK PURBA BARDHAMAN , SM/11491 New PROVIDING DRILLING CREWS FOR CONSTRUCTION OF TUBE WELL (250MM X 150MM) BY DEPARTMENTAL RIG MACHINE FOR KALERA W/S (TW-I) SCH, JAMALPUR BLOCK UNDER PURBA BARDHAMAN, CDD, PHE DTE. ORD/000288/2022-2023 319/CMSD-I 21/07/2022 15 C.M. ENTERPRISE 1.74 1.74 100 1
2781 PURBA BARDHAMAN Jamalpur Central Drilling GROUND WATER BASED KALERA PIPED WATER SUPPLY SCHEME JAMALPUR BLOCK PURBA BARDHAMAN , SM/11491 New PROVIDING TUBE WELL MATERIALS CONFORMING TO IS: 12818:2010 WITH OTHER WORKS AT SITE FOR CONSTRUCTION OF TUBE WELL AT KALERA W/S (TW-I) SCH, JAMALPUR BLOCK UNDER PURBA BARDHAMAN, CDD, PHE DTE. ORD/000289/2022-2023 316/CMSD-I 22/07/2022 15 C.M. ENTERPRISE 3.28 3.22 98.17 1
2782 PURBA BARDHAMAN Jamalpur Central Drilling GROUND WATER BASED KALERA PIPED WATER SUPPLY SCHEME JAMALPUR BLOCK PURBA BARDHAMAN , SM/11491 New PROVIDING TUBE WELL MATERIALS CONFORMING TO IS: 12818:2010 WITH OTHER WORKS AT SITE FOR CONSTRUCTION OF TUBE WELL AT KALERA W/S SCH (TW-II) SCH, JAMALPUR BLOCK UNDER PURBA BARDHAMAN, CDD, PHE DTE. ORD/000290/2022-2023 317/CMSD-I 22/07/2022 15 C.M. ENTERPRISE 3.28 3.12 95.12 1
2783 PURBA BARDHAMAN Jamalpur Central Drilling GROUND WATER BASED KALERA PIPED WATER SUPPLY SCHEME JAMALPUR BLOCK PURBA BARDHAMAN , SM/11491 New PROVIDING PEA SIZE GRAVELS AND BENTONITE POWDER SODIUM BASED AT SITE WITH OTHER WORKS FOR CONSTRUCTION OF TUBE WELL AT KELERA W/S (TW-I) SCHEME, JAMALPUR BLOCK UNDER PURBA BARDHAMAN, CDD, PHE DTE. ORD/000287/2022-2023 320/CMSD-I 21/07/2022 15 C.M. ENTERPRISE 1.88 1.19 63.3 1
2784 PURBA BARDHAMAN Jamalpur Central Drilling GROUND WATER BASED KALERA PIPED WATER SUPPLY SCHEME JAMALPUR BLOCK PURBA BARDHAMAN , SM/11491 New Additional Transportation of Departmental rig unit no. Super RR with compressor and pump unit from Kalera PWSS under CDD, PHE dte. Driller In Charge Junior Engineer ORD/000307/2022-2023 532/CMSD-II(D) 01/12/2022 7 PADMA ENGINEERING & CO. 0.75 0.75 100 1
2785 PURBA BARDHAMAN Jamalpur Central Drilling GROUND WATER BASED KALERA PIPED WATER SUPPLY SCHEME JAMALPUR BLOCK PURBA BARDHAMAN , SM/11491 New Providing drilling crews for construction of TW (250mm x 150mm) by Departmental rig machine for kalera WS (TW-II), Jamalpur block purba Burdwan, CDD, PHE Dte. ORD/000308/2022-2023 330/CMSD-I(D) 15/07/2022 15 C.M. ENTERPRISE 1.74 1.38 79.31 1
2786 PURBA BARDHAMAN Jamalpur Central Drilling GROUND WATER BASED KALERA PIPED WATER SUPPLY SCHEME JAMALPUR BLOCK PURBA BARDHAMAN , SM/11491 New PROVIDING PEA SIZE GRAVELS AND BENTONITE POWDER SODIUM BASED AT SITE WITH OTHER WORKS FOR CONSTRUCTION OF TUBE WELL AT KALERA W/S SCH (TW-II) SCH, JAMALPUR BLOCK UNDER PURBA BARDHAMAN, CDD, PHE DTE. ORD/000292/2022-2023 331/CMSD-I 15/07/2022 15 C.M. ENTERPRISE 1.88 1.16 61.7 1
2787 PURBA BARDHAMAN Jamalpur Burdwan Division GROUND WATER BASED KALERA PIPED WATER SUPPLY SCHEME JAMALPUR BLOCK PURBA BARDHAMAN , SM/11491 New Material Requisition To Resource Division RTOR000118/2023-2024 2155/BWD 10/05/2023 0 Resource Division 12.90 0.00 0 0
2788 PURBA BARDHAMAN Jamalpur Central Mechanical GROUND WATER BASED KALERA PIPED WATER SUPPLY SCHEME JAMALPUR BLOCK PURBA BARDHAMAN , SM/11491 New New Service Connection Charges for Kalera W/S Scheme PH-1 BILL/00002/2022-2023 25 02/01/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 4.51 0.00 0 0
2789 PURBA BARDHAMAN Jamalpur Central Mechanical GROUND WATER BASED KALERA PIPED WATER SUPPLY SCHEME JAMALPUR BLOCK PURBA BARDHAMAN , SM/11491 New New Service Connection Charges for Kalera W/S Scheme PH-2 BILL/00003/2022-2023 26 02/01/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 5.90 0.00 0 0
2790 PURBA BARDHAMAN Jamalpur Central Drilling GROUND WATER BASED KALERA PIPED WATER SUPPLY SCHEME JAMALPUR BLOCK PURBA BARDHAMAN , SM/11491 New Hiring of Diesel driven motor cab (BS-III & above) having contract carriage permit along with driver for the office of the Executive Engineer, CDD, PHE Dte. Assistant Engineer Junior Engineer ORD/000004/2023-2024 45/S&WSD 26/04/2023 7 ASHUTOSH DAS & CO 0.87 1.69 194.25 83
2791 PURBA BARDHAMAN Jamalpur Burdwan Division GROUND WATER BASED KALERA PIPED WATER SUPPLY SCHEME JAMALPUR BLOCK PURBA BARDHAMAN , SM/11491 New Augmentation of KALERA Piped Water Supply Scheme with LDS, FHTC, Rising main, Construction of 350 cum capacity OHR with 20.0 mtr. Staging height inclusive of soil investigation including construction of switch-rooms(5.40mx3.6m) & Boundary walls for new TW site under Jamalpur Block, District:- Purba-Burdwan. [Treated as "New Scheme in place of Augmentation" vide Corrigendum Notice No. 1544/CC, dated 02.08.2022.] AE(HQs) Junior Engineer, Burdwan Division ORD/000256/2022-2023 3855/BWD 07/09/2022 846 M/S MAA TARA CONSTRUCTION 302.71 262.20 86.62 100
2792 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED PIPED WATER SUPPLY SCHEME FOR BONPAS KAMARPARA TO ACCOMMODATE FHTC UNDER BHATAR BLOCK IN PURBA BARDHAMAN DISTRICT UNDER BURDWAN DIVISION PHE DTE , SM/10391 Augmentation Construction of 600 cum capacity 20 mtr staging height RCC Over Head Reservoir including pipe connection and cost of pipes, specials for Bonpass-Kamarpara & its adjoining mouzas water supply scheme under Burdwan Division, PHE Dte. Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000727/2021-2022 3655/BWD 14/07/2021 180 ASHOK MITRA 107.00 0.00 0 1
2793 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED PIPED WATER SUPPLY SCHEME FOR BONPAS KAMARPARA TO ACCOMMODATE FHTC UNDER BHATAR BLOCK IN PURBA BARDHAMAN DISTRICT UNDER BURDWAN DIVISION PHE DTE , SM/10391 Augmentation Sinking of additional 300 X 200mm dia Tube Well 200 mtr. Depth by D.R. Rig method using UPVC pipe (CD) and UPVC Deep Well Screen (RDS) at 4th & 5th Tube well Site for Augmentation of BONPAS-KAMARPARA Piped Water Supply Scheme, Block - Bhatar, Dist - Purba Bardhaman under Burdwan Division, PHE Dte. [2 Nos. GTW]. Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000141/2022-2023 3031/BWD 07/07/2022 45 B.K. ENTERPRISE 28.13 0.00 0 1
2794 PURBA BARDHAMAN Central Mechanical AUGMENTATION OF GROUND WATER BASED PIPED WATER SUPPLY SCHEME FOR BONPAS KAMARPARA TO ACCOMMODATE FHTC UNDER BHATAR BLOCK IN PURBA BARDHAMAN DISTRICT UNDER BURDWAN DIVISION PHE DTE , SM/10391 Augmentation Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination system and internal House wiring for Tube well no.- 5 at BonpassKamarpara Water Supply Scheme under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000765/2022-2023 3329/CMD 12/12/2022 30 CHOUDHURY ENTERPRISE 10.09 9.82 97.32 100
2795 PURBA BARDHAMAN Central Mechanical AUGMENTATION OF GROUND WATER BASED PIPED WATER SUPPLY SCHEME FOR BONPAS KAMARPARA TO ACCOMMODATE FHTC UNDER BHATAR BLOCK IN PURBA BARDHAMAN DISTRICT UNDER BURDWAN DIVISION PHE DTE , SM/10391 Augmentation Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination system and internal House wiring for Tube well no.- 4 at BonpassKamarpara Water Supply Scheme under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000764/2022-2023 3328/CMD 12/12/2022 30 P.K. ENGINEERING 10.06 9.65 95.92 80
2796 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED PIPED WATER SUPPLY SCHEME FOR BONPAS KAMARPARA TO ACCOMMODATE FHTC UNDER BHATAR BLOCK IN PURBA BARDHAMAN DISTRICT UNDER BURDWAN DIVISION PHE DTE , SM/10391 Augmentation Augmentation of BANPAS Piped Water Supply Scheme (Dhandalsa Mouza) with LDS & FHTC and construction of Pump House at 4th TW site under Bhatar Block, District:- Purba-Burdwan under Burdwan Division, PHE. Dte. [PART-F]. Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000716/2022-2023 891/BWD 01/03/2023 60 DEY NIRMAN 71.08 71.08 100 100
2797 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED PIPED WATER SUPPLY SCHEME FOR BONPAS KAMARPARA TO ACCOMMODATE FHTC UNDER BHATAR BLOCK IN PURBA BARDHAMAN DISTRICT UNDER BURDWAN DIVISION PHE DTE , SM/10391 Augmentation Repairing of Switch room cum chlorine room with sanitary and water supply arrangement (P.H-2) at 2nd Tubewell Site for Bonpas-Kamarpara and its adjoining mouza's water supply scheme under Durgapur Sub-Division, P.H.E Dte. Block:-Bhatar, Dist:Purba Bardhaman. [Gr.-F] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer2, Durgapur Sub-Division, PHE Dte. ORD/000274/2022-2023 499/DSD 12/08/2022 30 SUPRIYA RAY 2.03 0.00 0 100
2798 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED PIPED WATER SUPPLY SCHEME FOR BONPAS KAMARPARA TO ACCOMMODATE FHTC UNDER BHATAR BLOCK IN PURBA BARDHAMAN DISTRICT UNDER BURDWAN DIVISION PHE DTE , SM/10391 Augmentation Augmentation of BANPAS KAMARPARA Piped Water Supply Scheme (Haribati & Chandai Mouza) with LDS & FHTC within Bhatar Block, District:- Purba-Burdwan under Burdwan Division, PHE. Dte. [PART-E]. Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer2, Durgapur Sub-Division, PHE Dte. ORD/000103/2023-2024 2262/BWD 18/05/2023 60 M/S K.P. CONSTRUCTION 80.02 57.31 71.62 80
2799 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED PIPED WATER SUPPLY SCHEME FOR BONPAS KAMARPARA TO ACCOMMODATE FHTC UNDER BHATAR BLOCK IN PURBA BARDHAMAN DISTRICT UNDER BURDWAN DIVISION PHE DTE , SM/10391 Augmentation Augmentation of BANPAS Piped Water Supply Scheme (Narayanpur Mouza) with LDS, FHTC and Construction of Pump House at 4th TW site under Bhatar Block, District:- Purba-Burdwan under Burdwan Division, PHE. Dte. [PART-D]. Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000728/2022-2023 1029/BWD 09/03/2023 60 SARKAR AGENCY 111.93 111.20 99.35 100
2800 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED PIPED WATER SUPPLY SCHEME FOR BONPAS KAMARPARA TO ACCOMMODATE FHTC UNDER BHATAR BLOCK IN PURBA BARDHAMAN DISTRICT UNDER BURDWAN DIVISION PHE DTE , SM/10391 Augmentation Augmentation of BANPAS KAMARPARA Piped Water Supply Scheme (Ambana Mouza) with LDS, FHTC and Construction of Pump House at 4th TW site under Bhatar Block, District:- Purba-Burdwan under Burdwan Division, PHE. Dte. [PART-B]. Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer2, Durgapur Sub-Division, PHE Dte. ORD/000102/2023-2024 2261/BWD 18/05/2023 60 M/S K.P. CONSTRUCTION 91.92 88.24 96 100
2801 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED PIPED WATER SUPPLY SCHEME FOR BONPAS KAMARPARA TO ACCOMMODATE FHTC UNDER BHATAR BLOCK IN PURBA BARDHAMAN DISTRICT UNDER BURDWAN DIVISION PHE DTE , SM/10391 Augmentation Augmentation of BONPAS KAMARPARA Piped Water Supply Scheme (Banpas Mouza) with LDS, Rising main, FHTC and construction of Boundary wall for existing TW site under Bhatar Block, District:- Purba-Burdwan. (PART - A) Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer2, Durgapur Sub-Division, PHE Dte. ORD/000376/2023-2024 3110/BWD 19/07/2023 120 R.G. INFRASTRUCTURE 389.91 312.73 80.21 80
2802 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED PIPED WATER SUPPLY SCHEME FOR BONPAS KAMARPARA TO ACCOMMODATE FHTC UNDER BHATAR BLOCK IN PURBA BARDHAMAN DISTRICT UNDER BURDWAN DIVISION PHE DTE , SM/10391 Augmentation Augmentation of BANPAS Piped Water Supply Scheme (Mohanpur Mouza) with LDS & FHTC under Bhatar Block, District:- Purba-Burdwan under Burdwan Division, PHE. Dte. [PART-C]. Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer2, Durgapur Sub-Division, PHE Dte. ORD/000713/2022-2023 888/BWD 01/03/2023 60 KOUSIK MALLICK 104.59 106.42 101.75 100
2803 PURBA BARDHAMAN Central Mechanical AUGMENTATION OF GROUND WATER BASED PIPED WATER SUPPLY SCHEME FOR BONPAS KAMARPARA TO ACCOMMODATE FHTC UNDER BHATAR BLOCK IN PURBA BARDHAMAN DISTRICT UNDER BURDWAN DIVISION PHE DTE , SM/10391 Augmentation Illumination arrangement and miscelleneous works at Bonpas Kamarpara water supply scheme under Bhatar Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000406/2024-2025 2785/CMD 01/10/2024 60 CINZANO 14.08 0.00 0 50
2804 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED PIPED WATER SUPPLY SCHEME FOR BONPAS KAMARPARA TO ACCOMMODATE FHTC UNDER BHATAR BLOCK IN PURBA BARDHAMAN DISTRICT UNDER BURDWAN DIVISION PHE DTE , SM/10391 Augmentation Special Repairing work of Distribution System , Rising main, Sluice Valves of BONPAS KAMARPARA PWSS ,BLOCK-BHATAR under DURGAPUR Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer1, Durgapur Sub-Division, PHE Dte. ORD/000625/2025-2026 1131/DSD 21/08/2025 15 BAMDEB CONSTRUCTION & CO 0.97 0.00 0 0
2805 PURBA BARDHAMAN Memari-II Burdwan Division KUCHUT PIPED WATER SUPPLY SCHEME , SM/13464 New Supply of Inspection Vehicle for inspection of different JJM related (Schemes) works as and when required including supply of driver & fuel (minimum 8 Hours duty per day) and all taxes etc. for Burdwan Sub-Division under Burdwan Division, P.H.E. Dte. consider 96.00 Km. run per day.[Period from 01/08/2023 to 31/10/2023] ORD/000845/2023-2024 1759/BSD 28/07/2023 66 MD HASIN 0.85 0.00 0 0
2806 PURBA BARDHAMAN Memari-II Burdwan Division KUCHUT PIPED WATER SUPPLY SCHEME , SM/13464 New Supply & delivery of different dia. MJ Coller for FHTC as well as smooth running of different W/S. Schemes under Burdwan Division, P.H.E. Dte. [i.e. (1) Magra PWSS, Memari-I Block, (2) Kuchut PWSS, Memari - II Block, (3) Khundkuri PWSS, Khandaghosh Block & (4) Samanti PWSS, Burdwan - II Block)] ORD/000653/2023-2024 4076/BWD 13/09/2023 20 SSPR VALVE MANUFACTURING PVT LTD. 20.63 5.00 24.24 100
2807 PURBA BARDHAMAN Memari-II Burdwan Division KUCHUT PIPED WATER SUPPLY SCHEME , SM/13464 New Material Requisition To Resource Division RTOR000072/2022-2023 1269/BWD 17/03/2023 0 Resource Division 14.20 0.00 0 0
2808 PURBA BARDHAMAN Memari-II Burdwan Division KUCHUT PIPED WATER SUPPLY SCHEME , SM/13464 New Material Requisition To Resource Division RTOR000466/2023-2024 3990/BWD 08/09/2023 0 Resource Division 1.70 0.00 0 0
2809 PURBA BARDHAMAN Memari-II Burdwan Division KUCHUT PIPED WATER SUPPLY SCHEME , SM/13464 New Material Requisition To Resource Division RTOR000674/2023-2024 5051/BWD 23/11/2023 0 Resource Division 20.46 0.00 0 0
2810 PURBA BARDHAMAN Memari-II Central Mechanical KUCHUT PIPED WATER SUPPLY SCHEME , SM/13464 New New service connection charges for Kuchut PWSS TW-1 BILL/00778/2023-2024 BP-2023-24-77 24/07/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.87 0.00 0 0
2811 PURBA BARDHAMAN Memari-II Central Mechanical KUCHUT PIPED WATER SUPPLY SCHEME , SM/13464 New New service connection charges for Kuchut PWSS TW-2 BILL/00779/2023-2024 BP-2023-24-78 24/07/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 2.83 0.00 0 0
2812 PURBA BARDHAMAN Memari-II Burdwan Division KUCHUT PIPED WATER SUPPLY SCHEME , SM/13464 New Different works related (sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of different capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site) to KUCHUT & NOAHATI Piped Water Supply Scheme under Memari - II Block, District:- Purba Bardhaman [NEW SCHEME] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000750/2022-2023 1172/BWD 14/03/2023 1113 NATIONAL CONSTRUCTION 831.75 354.66 42.64 99
2813 PURBA BARDHAMAN Memari-II Burdwan Division KUCHUT PIPED WATER SUPPLY SCHEME , SM/13464 New Continuation work for Supply of one no. Diesel / LPG / CNG driven Motor Cab / Maxi Cab (Air Condition) on hire basis for the office of the Superintending Engineer, Central Circle, P.H.E. Dte. [Period from 01.06.2024 to 31.07.2024] AE(HQs) J.E. 1 BURDWAN ORD/000440/2024-2025 305/AE/HQ 31/05/2024 61 SOURAV JANA 0.80 0.80 100 0
2814 PURBA BARDHAMAN Memari-II Burdwan Division KUCHUT PIPED WATER SUPPLY SCHEME , SM/13464 New Continuation work for Supply of one no. Diesel / LPG / CNG driven Motor Cab / Maxi Cab (Air Condition) on hire basis for the office of the Superintending Engineer, Central Circle, P.H.E. Dte. [Period from 01.10.2024 to 30.11.2024] AE(HQs) Contractual Junior Engineer ORD/000706/2024-2025 822/AE/HQ 01/10/2024 61 SOURAV JANA 0.80 0.76 95 0
2815 PURBA BARDHAMAN Memari-II Central Mechanical KUCHUT PIPED WATER SUPPLY SCHEME , SM/13464 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at NOAHATI & others water supply scheme under Memari-II Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. ASSISTANT ENGINEER Junior Engineer ORD/000102/2024-2025 2395/CMD 02/08/2024 90 S.G. TECHNICAL SERVICES 36.99 0.00 0 0
2816 PURBA BARDHAMAN Memari-II Burdwan Division KUCHUT PIPED WATER SUPPLY SCHEME , SM/13464 New Supply of one no. Diesel / LPG / CNG driven Motor Cab / Maxi Cab (Air Condition) on hire basis for the office of the Superintending Engineer, Central Circle, P.H.E. Dte. [Period from 01.02.2024 to 31.03.2024] AE(HQs) J.E. 1 BURDWAN ORD/001203/2023-2024 41/AE/HQ 29/01/2024 60 SOURAV JANA 0.80 0.80 100 50
2817 PURBA BARDHAMAN Memari-II Burdwan Division KUCHUT PIPED WATER SUPPLY SCHEME , SM/13464 New Continuation work for Supply of one no. Diesel / LPG / CNG driven Motor Cab / Maxi Cab (Air Condition) on hire basis for the office of the Superintending Engineer, Central Circle, P.H.E. Dte. [Period from 01.04.2024 to 31.05.2024] AE(HQs) J.E. 1 BURDWAN ORD/001229/2023-2024 232/AE/HQ 28/03/2024 61 SOURAV JANA 0.80 0.80 100 0
2818 PURBA BARDHAMAN Memari-II Burdwan Division KUCHUT PIPED WATER SUPPLY SCHEME , SM/13464 New Continuation work for Supply of one no. Diesel / LPG / CNG driven Motor Cab / Maxi Cab (Air Condition) on hire basis for the office of the Superintending Engineer, Central Circle, P.H.E. Dte. [Period from 01.08.2024 to 30.09.2024] AE(HQs) Contractual Junior Engineer ORD/000505/2024-2025 546/AE/HQ 01/08/2024 61 SOURAV JANA 0.80 0.80 100 0
2819 PURBA BARDHAMAN Memari-II Central Mechanical KUCHUT PIPED WATER SUPPLY SCHEME , SM/13464 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at Kuchut Water Supply Scheme [ Block- Memari-2 ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER Junior Engineer ORD/000050/2023-2024 2512/CMD 02/06/2023 30 CHOUDHURY ENTERPRISE 29.40 24.17 82.21 50
2820 PURBA BARDHAMAN Memari-II Burdwan Division KUCHUT PIPED WATER SUPPLY SCHEME , SM/13464 New Continuation work for Supply of one no. Diesel / LPG / CNG driven Motor Cab / Maxi Cab (Air Condition) on hire basis for the office of the Superintending Engineer, Central Circle, P.H.E. Dte. [Period from 01.12.2024 to 31.01.2025] AE(HQs) Contractual Junior Engineer ORD/000898/2024-2025 1011/AE/HQ 29/11/2024 61 SOURAV JANA 0.80 0.80 100 0
2821 PURBA BARDHAMAN Memari-II Central Mechanical KUCHUT PIPED WATER SUPPLY SCHEME , SM/13464 New Supply and installation of Electro-Magnetic flow meter at HARIGRAM, KUCHUT & others water supply scheme under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. ASSISTANT ENGINEER Junior Engineer ORD/000564/2024-2025 3103/CMD 11/12/2024 60 S DUTTA 15.06 0.00 0 0
2822 PURBA BARDHAMAN Memari-II Burdwan Division KUCHUT PIPED WATER SUPPLY SCHEME , SM/13464 New Continuation work for Supply of one no. Diesel / LPG / CNG driven Motor Cab / Maxi Cab (Air Condition) on hire basis for the office of the Superintending Engineer, Central Circle, P.H.E. Dte. [Period from 01.02.2025 to 31.03.2025] AE(HQs) Contractual Junior Engineer ORD/001156/2024-2025 184/AE/HQ 31/01/2025 59 SOURAV JANA 0.80 0.80 100 0
2823 PURBA BARDHAMAN Memari-II Burdwan Division KUCHUT PIPED WATER SUPPLY SCHEME , SM/13464 New Different Types of work involved in connection with different New Schemes (05 Nos.) Piped Water Supply Scheme under Memari II Block within Burdwan Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000003/2025-2026 1116/BWD 03/04/2025 120 SOFIQUL ISLAM 176.89 0.00 0 0
2824 PURBA BARDHAMAN Memari-II Burdwan Division KUCHUT PIPED WATER SUPPLY SCHEME , SM/13464 New Continuation work for Supply of one no. Diesel / LPG / CNG driven Motor Cab / Maxi Cab (Air Condition) on hire basis for the office of the Superintending Engineer, Central Circle, P.H.E. Dte. [Period from 01.04.2025 to 31.05.2025] AE(HQs) Contractual Junior Engineer ORD/001403/2024-2025 454/AE/HQ 28/03/2025 61 SOURAV JANA 0.80 0.40 50 0
2825 PURBA BARDHAMAN Memari-II Burdwan Division KUCHUT PIPED WATER SUPPLY SCHEME , SM/13464 New Continuation work for Supply of one no. Diesel / LPG / CNG driven Motor Cab / Maxi Cab (Air Condition) on hire basis for the office of the Superintending Engineer, Central Circle, P.H.E. Dte. [Period from 01.06.2025 to 31.07.2025] AE(HQs), Burdwan Division, PHE Dte. Contractual Junior Engineer ORD/000166/2025-2026 688/AE/HQ 30/05/2025 61 SOURAV JANA 0.80 0.00 0 0
2826 PURBA BARDHAMAN Memari-II Burdwan Division KUCHUT PIPED WATER SUPPLY SCHEME , SM/13464 New Continuation work for Supply of one no. Diesel / LPG / CNG driven Motor Cab / Maxi Cab (Air Condition) on hire basis for the office of the Superintending Engineer, Central Circle, P.H.E. Dte. [Period from 01.08.2025 to 30.09.2025] AE(HQs), Burdwan Division, PHE Dte. Contractual Junior Engineer ORD/000526/2025-2026 1033/AE/HQ 01/08/2025 61 SOURAV JANA 0.80 0.00 0 0
2827 PURBA BARDHAMAN Burdwan Division Providing Water Supply Arrangement by Sinking of Tube Well at left out Primary Schools(292 nos) for 100% School Coverage in Purba Bardhaman within Burdwan North Sub Division under Burdwan Division P.H.E. DTE. , SM/11284 School Sinking of 100mtr. deep 100 × 40mm tubewell for providing water supply arrangement in Schools under Galsi I Block (42 Nos School) within Purba Bardhaman District under Burdwan Division, PHE Dte. (Part-A). Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000299/2022-2023 3663/BWD 29/08/2022 45 SAIKAT RAY 47.35 0.00 0 0
2828 PURBA BARDHAMAN Burdwan Division Providing Water Supply Arrangement by Sinking of Tube Well at left out Primary Schools(292 nos) for 100% School Coverage in Purba Bardhaman within Burdwan North Sub Division under Burdwan Division P.H.E. DTE. , SM/11284 School Material Requisition To Resource Division RTOR000050/2022-2023 5397/BWD 12/12/2022 0 Resource Division 85.00 0.00 0 0
2829 PURBA BARDHAMAN Burdwan Division Providing Water Supply Arrangement by Sinking of Tube Well at left out Primary Schools(292 nos) for 100% School Coverage in Purba Bardhaman within Burdwan North Sub Division under Burdwan Division P.H.E. DTE. , SM/11284 School Sinking of 100mtr. deep 100 × 40mm tubewell for providing water supply arrangement in Schools under Galsi ? II Block (40 Nos School) within Purba Bardhaman District under Burdwan Division, PHE Dte. (Part-B). Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000298/2022-2023 3608/BWD 18/08/2022 45 GENUINE ENGINEERING CO-OP. SOCIETY LTD. 45.08 36.13 80.15 0
2830 PURBA BARDHAMAN Burdwan Division Providing Water Supply Arrangement by Sinking of Tube Well at left out Primary Schools(292 nos) for 100% School Coverage in Purba Bardhaman within Burdwan North Sub Division under Burdwan Division P.H.E. DTE. , SM/11284 School Sinking of 100mtr. deep 100 × 40mm tubewell for providing water supply arrangement in Schools under Ausgram ? I Block (27 Nos School) within Purba Bardhaman District under Burdwan Division, PHE Dte. Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000290/2022-2023 3596/BWD 17/08/2022 45 SIRAJUL MANDAL 29.87 28.74 96.22 100
2831 PURBA BARDHAMAN Burdwan Division Providing Water Supply Arrangement by Sinking of Tube Well at left out Primary Schools(292 nos) for 100% School Coverage in Purba Bardhaman within Burdwan North Sub Division under Burdwan Division P.H.E. DTE. , SM/11284 School Material Requisition To Resource Division RTOR000022/2022-2023 3299/BWD 29/07/2022 0 Resource Division 80.44 0.00 0 0
2832 PURBA BARDHAMAN Burdwan Division Providing Water Supply Arrangement by Sinking of Tube Well at left out Primary Schools(292 nos) for 100% School Coverage in Purba Bardhaman within Burdwan North Sub Division under Burdwan Division P.H.E. DTE. , SM/11284 School Sinking of 100mtr. deep 100 × 40mm tubewell for providing water supply arrangement in Schools under Bhatar Block (40 Nos School) within Purba Bardhaman District under Burdwan Division, PHE Dte. Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000194/2022-2023 3417/BWD 05/08/2022 45 DHIRENDRANATH SOM 45.05 33.39 74.12 100
2833 PURBA BARDHAMAN Burdwan Division Providing Water Supply Arrangement by Sinking of Tube Well at left out Primary Schools(292 nos) for 100% School Coverage in Purba Bardhaman within Burdwan North Sub Division under Burdwan Division P.H.E. DTE. , SM/11284 School Sinking of 100mtr. deep 100 × 40mm tubewell for providing water supply arrangement in Schools under Galsi ¿ I Block (41 Nos School) within Purba Bardhaman District under Burdwan Division, PHE Dte. (Part-B). Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000308/2022-2023 3664/BWD 29/08/2022 45 ASHOK KUMAR GHOSH 46.23 34.22 74.02 100
2834 PURBA BARDHAMAN Burdwan Division Providing Water Supply Arrangement by Sinking of Tube Well at left out Primary Schools(292 nos) for 100% School Coverage in Purba Bardhaman within Burdwan North Sub Division under Burdwan Division P.H.E. DTE. , SM/11284 School Sinking of 100mtr. deep 100 × 40mm tubewell for providing water supply arrangement in Schools under Ausgram ? II Block (31 Nos School) within Purba Bardhaman District under Burdwan Division, PHE Dte. (Part-A). Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000344/2022-2023 3691/BWD 29/08/2022 45 BASUNDHARA SOLUTION 34.60 33.31 96.27 100
2835 PURBA BARDHAMAN Khandaghosh Burdwan Division BICHKHARA PIPED WATER SUPPLY SCHEME , SM/13422 New Material Requisition To Resource Division RTOR000098/2022-2023 1962/BWD 25/04/2023 0 Resource Division 2.14 0.00 0 0
2836 PURBA BARDHAMAN Khandaghosh Burdwan Division BICHKHARA PIPED WATER SUPPLY SCHEME , SM/13422 New Material Requisition To Resource Division RTOR000077/2022-2023 1265/BWD 17/03/2023 0 Resource Division 2.71 0.00 0 0
2837 PURBA BARDHAMAN Khandaghosh Burdwan Division BICHKHARA PIPED WATER SUPPLY SCHEME , SM/13422 New Material Requisition To Resource Division RTOR000711/2023-2024 5042/BWD 23/11/2023 0 Resource Division 20.46 0.00 0 0
2838 PURBA BARDHAMAN Khandaghosh Central Mechanical BICHKHARA PIPED WATER SUPPLY SCHEME , SM/13422 New New service connection charges for Bichkhara W/S Scheme TW-2 BILL/00684/2023-2024 BP-2023-24-30 22/06/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 0.64 0.00 0 0
2839 PURBA BARDHAMAN Khandaghosh Central Mechanical BICHKHARA PIPED WATER SUPPLY SCHEME , SM/13422 New New service connection charges for Bichkhara W/S Scheme TW-1 BILL/00683/2023-2024 BP-2023-24-29 22/06/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 4.61 0.00 0 0
2840 PURBA BARDHAMAN Khandaghosh Central Mechanical BICHKHARA PIPED WATER SUPPLY SCHEME , SM/13422 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at BICHKHARA & others water supply scheme under Khandoghosh Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman ASSISTANT ENGINEER Junior Engineer ORD/000064/2024-2025 2390/CMD 02/08/2024 90 MS DAS ELECTRIC CO 46.54 0.00 0 0
2841 PURBA BARDHAMAN Khandaghosh Burdwan Division BICHKHARA PIPED WATER SUPPLY SCHEME , SM/13422 New BICHKHARA Piped Water Supply Scheme with sinking of Tube-well, LDS, Rising Main, FHTC, construction of switch-rooms & boundary walls at different TW site under KHANDOGHOSH Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer1, Durgapur Sub-Division, PHE Dte.,Junior Engineer2, Durgapur Sub-Division, PHE Dte. ORD/000638/2022-2023 253/BWD 16/01/2023 180 KOUSIK MALLICK 121.67 112.18 92.2 90
2842 PURBA BARDHAMAN Khandaghosh Central Mechanical BICHKHARA PIPED WATER SUPPLY SCHEME , SM/13422 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at Bichkhara Water Supply Scheme [ Block- Khandogosh ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER Junior Engineer ORD/000042/2023-2024 2494/CMD 01/06/2023 30 CONCORD ENGINEERING 28.89 23.91 82.76 98
2843 PURBA BARDHAMAN Khandaghosh Central Mechanical BICHKHARA PIPED WATER SUPPLY SCHEME , SM/13422 New Supply & delivery of standby Submersible pumping machinery & automatic Chlorinator for Bichkhara & others water supply scheme, under CMD, P.H.E. Dte., Dist.- Purba Bardhaman ASSISTANT ENGINEER Junior Engineer ORD/001408/2023-2024 149/CMSD 22/01/2024 15 CHOUDHURY ENTERPRISE 1.76 1.76 100 100
2844 PURBA BARDHAMAN Khandaghosh Burdwan Division BICHKHARA PIPED WATER SUPPLY SCHEME , SM/13422 New Balance work for providing Functional Household Tap Connection (FHTC) within the command area BICHKHARA & TELUN W/S. Scheme of Khandaghosh Block under Burdwan Division, PHE. Dte. Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer1, Durgapur Sub-Division, PHE Dte. ORD/001096/2024-2025 434/BWD 20/01/2025 182 KOUSIK MALLICK 108.55 0.00 0 50
2845 PURBA BARDHAMAN Khandaghosh Burdwan Division PUNSHUR PIPED WATER SUPPLY SCHEME IN KHANDOGHOSH BLOCK , SM/13450 New Material Requisition To Resource Division RTOR000076/2022-2023 1254/BWD 17/03/2023 0 Resource Division 4.93 0.00 0 0
2846 PURBA BARDHAMAN Khandaghosh Burdwan Division PUNSHUR PIPED WATER SUPPLY SCHEME IN KHANDOGHOSH BLOCK , SM/13450 New Material Requisition To Resource Division RTOR000104/2022-2023 1634/BWD 06/04/2023 0 Resource Division 0.76 0.00 0 0
2847 PURBA BARDHAMAN Khandaghosh Burdwan Division PUNSHUR PIPED WATER SUPPLY SCHEME IN KHANDOGHOSH BLOCK , SM/13450 New Material Requisition To Resource Division RTOR000704/2023-2024 5039/BWD 23/11/2023 0 Resource Division 20.46 0.00 0 0
2848 PURBA BARDHAMAN Khandaghosh Central Mechanical PUNSHUR PIPED WATER SUPPLY SCHEME IN KHANDOGHOSH BLOCK , SM/13450 New Shifting of 25KVA DTR at Punshur Water Supply Scheme BILL/00608/2023-2024 BP-2023-24-17 02/06/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 2.88 0.00 0 0
2849 PURBA BARDHAMAN Khandaghosh Central Mechanical PUNSHUR PIPED WATER SUPPLY SCHEME IN KHANDOGHOSH BLOCK , SM/13450 New New service connection charges of Punshur W/S Scheme TW-2 BILL/00677/2023-2024 BP-2023-24-22 21/06/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 2.80 0.00 0 0
2850 PURBA BARDHAMAN Khandaghosh Central Mechanical PUNSHUR PIPED WATER SUPPLY SCHEME IN KHANDOGHOSH BLOCK , SM/13450 New New service connection charges of Punshur W/S Scheme TW-1 BILL/00676/2023-2024 BP-2023-24-21 21/06/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.29 0.00 0 0
2851 PURBA BARDHAMAN Khandaghosh Burdwan Division PUNSHUR PIPED WATER SUPPLY SCHEME IN KHANDOGHOSH BLOCK , SM/13450 New PUNSUR Piped Water Supply Scheme with sinking of Tube-well, LDS, Rising Main, FHTC, Construction of 150 cum capacity RCC OHR with 20.0 mtr. with Staging height including soil investigation & construction of switch-rooms & boundary walls at different TW site under KHANDOGOSH Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer1, Durgapur Sub-Division, PHE Dte.,Junior Engineer2, Durgapur Sub-Division, PHE Dte. ORD/000637/2022-2023 162/BWD 11/01/2023 365 TIRUPATI ENTERPRISES 278.54 157.59 56.58 75
2852 PURBA BARDHAMAN Khandaghosh Central Mechanical PUNSHUR PIPED WATER SUPPLY SCHEME IN KHANDOGHOSH BLOCK , SM/13450 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at BICHKHARA & others water supply scheme under Khandoghosh Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman ASSISTANT ENGINEER Junior Engineer ORD/000064/2024-2025 2390/CMD 02/08/2024 90 MS DAS ELECTRIC CO 46.54 0.00 0 0
2853 PURBA BARDHAMAN Khandaghosh Central Mechanical PUNSHUR PIPED WATER SUPPLY SCHEME IN KHANDOGHOSH BLOCK , SM/13450 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at Punsur Water Supply Scheme [ Block- Khandogosh ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER Junior Engineer ORD/000043/2023-2024 2495/CMD 01/06/2023 30 M/S. SWAPAN BANERJEE 28.94 11.94 41.26 100
2854 PURBA BARDHAMAN Khandaghosh Central Mechanical PUNSHUR PIPED WATER SUPPLY SCHEME IN KHANDOGHOSH BLOCK , SM/13450 New Supply & installation works for Punsur PWSS. BILL/02564/2023-2024 BP-2023-24-547 20/02/2024 0 M/S. SWAPAN BANERJEE 11.87 0.00 0 0
2855 PURBA BARDHAMAN Khandaghosh Burdwan Division PUNSHUR PIPED WATER SUPPLY SCHEME IN KHANDOGHOSH BLOCK , SM/13450 New Supply of Inspection Vehicle for inspection of different JJM related (Schemes) works as and when required including supply of driver & fuel (minimum 8 Hours duty per day) and all taxes etc. for Durgapur Sub-Division under Burdwan Division, P.H.E. Dte.consider 96.00 Km. run per day [Period February'2024 to April'2024] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer2, Durgapur Sub-Division, PHE Dte. ORD/001233/2023-2024 91/DSD 31/01/2024 78 MD HASIN 1.00 0.29 29 0
2856 PURBA BARDHAMAN Khandaghosh Burdwan Division PUNSHUR PIPED WATER SUPPLY SCHEME IN KHANDOGHOSH BLOCK , SM/13450 New Continuation for the work of Supply of Inspection Vehicle for inspection of different JJM related (Schemes) works as and when required including supply of driver & fuel (minimum 8 Hours duty per day) and all taxes etc. for Durgapur Sub-Division under BurdwanDivision, P.H.E. Dte.consider 96.00 Km. run per day [Period May'2024 to July'2024] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000255/2024-2025 369/DSD 30/04/2024 78 MD HASIN 1.00 0.33 33 0
2857 PURBA BARDHAMAN Khandaghosh Burdwan Division PUNSHUR PIPED WATER SUPPLY SCHEME IN KHANDOGHOSH BLOCK , SM/13450 New Conducting physical Household Survey at the IMIS reported village for HGJ certification and providing balance FHTC for Har Ghar Jal certification including conducting Gram Sabhas for different IMIS reported villages across the district under Burdwan Division, PHE Dte. AE(HQs),Assistant Engineer ,Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE.,Assistant Engineer, Durgapur Sub Division, P.H.E. Dte JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000428/2024-2025 3107/BWD 12/08/2024 323 TUBGRAM GRAMMYAK UNNAYAN SAMITY 309.60 0.00 0 85
2858 PURBA BARDHAMAN Memari-I Burdwan Division MAGRA PIPED WATER SUPPLY SCHEME IN MEMARI-1 BLOCK , SM/13491 New Supply of Inspection Vehicle for inspection of different JJM related (Schemes) works as and when required including supply of driver & fuel (minimum 8 Hours duty per day) and all taxes etc. for Burdwan Sub-Division under Burdwan Division, P.H.E. Dte. consider 96.00 Km. run per day.[Period from 01/08/2023 to 31/10/2023] ORD/000845/2023-2024 1759/BSD 28/07/2023 66 MD HASIN 0.85 0.00 0 0
2859 PURBA BARDHAMAN Memari-I Burdwan Division MAGRA PIPED WATER SUPPLY SCHEME IN MEMARI-1 BLOCK , SM/13491 New Supply & delivery of different dia. MJ Coller for FHTC as well as smooth running of different W/S. Schemes under Burdwan Division, P.H.E. Dte. [i.e. (1) Magra PWSS, Memari-I Block, (2) Kuchut PWSS, Memari - II Block, (3) Khundkuri PWSS, Khandaghosh Block & (4) Samanti PWSS, Burdwan - II Block)] ORD/000653/2023-2024 4076/BWD 13/09/2023 20 SSPR VALVE MANUFACTURING PVT LTD. 20.63 5.63 27.29 100
2860 PURBA BARDHAMAN Memari-I Burdwan Division MAGRA PIPED WATER SUPPLY SCHEME IN MEMARI-1 BLOCK , SM/13491 New Material Requisition To Resource Division RTOR000070/2022-2023 1251/BWD 17/03/2023 0 Resource Division 12.34 0.00 0 0
2861 PURBA BARDHAMAN Memari-I Burdwan Division MAGRA PIPED WATER SUPPLY SCHEME IN MEMARI-1 BLOCK , SM/13491 New Material Requisition To Resource Division RTOR000462/2023-2024 3986/BWD 08/09/2023 0 Resource Division 8.96 0.00 0 0
2862 PURBA BARDHAMAN Memari-I Burdwan Division MAGRA PIPED WATER SUPPLY SCHEME IN MEMARI-1 BLOCK , SM/13491 New Material Requisition To Resource Division RTOR000676/2023-2024 5080/BWD 23/11/2023 0 Resource Division 20.46 0.00 0 0
2863 PURBA BARDHAMAN Memari-I Burdwan Division MAGRA PIPED WATER SUPPLY SCHEME IN MEMARI-1 BLOCK , SM/13491 New Continuation work for Supply of one no. Diesel / LPG / CNG driven Motor Cab / Maxi Cab (Air Condition) on hire basis for the office of the Superintending Engineer, Central Circle, P.H.E. Dte. to be used by the Deputy Superintending Engineer, Central Circle, P.H.E. Dte. [Period from 01.06.2024 to 31.07.2024] AE(HQs) J.E. 1 BURDWAN ORD/000441/2024-2025 307/AE/HQ 31/05/2024 61 MD HASIN 0.80 0.76 95 0
2864 PURBA BARDHAMAN Memari-I Burdwan Division MAGRA PIPED WATER SUPPLY SCHEME IN MEMARI-1 BLOCK , SM/13491 New Supply of one no. Diesel / LPG / CNG driven Motor Cab / Maxi Cab (Air Condition) on hire basis for the office of the Superintending Engineer, Central Circle, P.H.E. Dte. to be used by the Deputy Superintending Engineer, Central Circle, P.H.E. Dte. [Period from 01.02.2024 to 31.03.2024] AE(HQs) J.E. 1 BURDWAN ORD/001204/2023-2024 42/AE/HQ 29/01/2024 60 MD HASIN 0.80 0.76 95 50
2865 PURBA BARDHAMAN Memari-I Burdwan Division MAGRA PIPED WATER SUPPLY SCHEME IN MEMARI-1 BLOCK , SM/13491 New Continuation work for Supply of one no. Diesel / LPG / CNG driven Motor Cab / Maxi Cab (Air Condition) on hire basis for the office of the Superintending Engineer, Central Circle, P.H.E. Dte. to be used by the Deputy Superintending Engineer, Central Circle, P.H.E. Dte. [Period from 01.08.2024 to 30.09.2024] AE(HQs) Contractual Junior Engineer ORD/000508/2024-2025 548/AE/HQ 01/08/2024 61 MD HASIN 0.80 0.75 93.75 0
2866 PURBA BARDHAMAN Memari-I Burdwan Division MAGRA PIPED WATER SUPPLY SCHEME IN MEMARI-1 BLOCK , SM/13491 New Field level data validation of FHTC executed by Agencies on the basis of pictorial data with the objective of controlling multiple entry,improving data quality in terms of absolute household by verification through electric connection or any other unique documents and making error free database of MAGRA Pipe Water Supply Scheme in Memari-I Block within Burdwan Sub-Division under Burdwan Division,PHE Dte JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000942/2024-2025 2731/BSD 10/12/2024 30 TECHVISION 0.80 0.00 0 0
2867 PURBA BARDHAMAN Memari-I Central Mechanical MAGRA PIPED WATER SUPPLY SCHEME IN MEMARI-1 BLOCK , SM/13491 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at SAHAPUR & others water supply scheme under Memari-I Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. ASSISTANT ENGINEER Junior Engineer ORD/000100/2024-2025 2392/CMD 02/08/2024 90 MITRA ENTERPRISE 47.62 0.00 0 0
2868 PURBA BARDHAMAN Memari-I Burdwan Division MAGRA PIPED WATER SUPPLY SCHEME IN MEMARI-1 BLOCK , SM/13491 New Continuation work for Supply of one no. Diesel / LPG / CNG driven Motor Cab / Maxi Cab (Air Condition) on hire basis for the office of the Superintending Engineer, Central Circle, P.H.E. Dte. to be used by the Deputy Superintending Engineer, Central Circle, P.H.E. Dte. [Period from 01.04.2024 to 31.05.2024] AE(HQs) J.E. 1 BURDWAN ORD/001230/2023-2024 233/AE/HQ 28/03/2024 61 MD HASIN 0.80 0.74 92.5 0
2869 PURBA BARDHAMAN Memari-I Central Mechanical MAGRA PIPED WATER SUPPLY SCHEME IN MEMARI-1 BLOCK , SM/13491 New New Service connection for Magra PWSS TW-2. BILL/02338/2023-2024 BP-2023-24-474 31/01/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.70 0.00 0 0
2870 PURBA BARDHAMAN Memari-I Central Mechanical MAGRA PIPED WATER SUPPLY SCHEME IN MEMARI-1 BLOCK , SM/13491 New New service connection for Magra W/S Sechem. BILL/02184/2023-2024 BP-2023-24-379 16/01/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 10.10 0.00 0 0
2871 PURBA BARDHAMAN Memari-I Burdwan Division MAGRA PIPED WATER SUPPLY SCHEME IN MEMARI-1 BLOCK , SM/13491 New MAGRA Piped Water Supply Scheme with Sinking of Tube-well, , Laying distribution system (LDS), Rising Main, FHTC, Construction of 250 cum capacity OHR with 20.0 mtr. with Staging height including soil investigation & construction of switch-rooms (5.40mx3.60m) & boundary walls with gate at different TW site. Block:- Memari-I, District:- Purba-Bardhaman.[NEW SCHEME] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000672/2022-2023 390/BWD 31/01/2023 1005 M/S ASHA CONSTRUCTION 425.89 363.92 85.45 85
2872 PURBA BARDHAMAN Memari-I Central Mechanical MAGRA PIPED WATER SUPPLY SCHEME IN MEMARI-1 BLOCK , SM/13491 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at Magra Water Supply Scheme [ Block- Memari-1 ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER Junior Engineer ORD/000650/2023-2024 3993/CMD 29/08/2023 611 ORIENTAL ENGINEERING CO. 29.35 8.47 28.86 100
2873 PURBA BARDHAMAN Memari-I Burdwan Division MAGRA PIPED WATER SUPPLY SCHEME IN MEMARI-1 BLOCK , SM/13491 New Continuation work for Supply of one no. Diesel / LPG / CNG driven Motor Cab / Maxi Cab (Air Condition) on hire basis for the office of the Superintending Engineer, Central Circle, P.H.E. Dte. to be used by the Deputy Superintending Engineer, Central Circle, P.H.E. Dte. [Period from 01.02.2025 to 31.03.2025] AE(HQs) Contractual Junior Engineer ORD/001153/2024-2025 185/AE/HQ 31/01/2025 59 MD HASIN 0.80 0.34 42.5 0
2874 PURBA BARDHAMAN Memari-I Burdwan Division MAGRA PIPED WATER SUPPLY SCHEME IN MEMARI-1 BLOCK , SM/13491 New Continuation work for Supply of one no. Diesel / LPG / CNG driven Motor Cab / Maxi Cab (Air Condition) on hire basis for the office of the Superintending Engineer, Central Circle, P.H.E. Dte. to be used by the Deputy Superintending Engineer, Central Circle, P.H.E. Dte. [Period from 01.12.2024 to 31.01.2025] AE(HQs) Contractual Junior Engineer ORD/000895/2024-2025 1009/AE/HQ 29/11/2024 61 MD HASIN 0.80 0.78 97.5 0
2875 PURBA BARDHAMAN Memari-I Burdwan Division MAGRA PIPED WATER SUPPLY SCHEME IN MEMARI-1 BLOCK , SM/13491 New Continuation work for Supply of one no. Diesel / LPG / CNG driven Motor Cab / Maxi Cab (Air Condition) on hire basis for the office of the Superintending Engineer, Central Circle, P.H.E. Dte. to be used by the Deputy Superintending Engineer, Central Circle, P.H.E. Dte. [Period from 01.10.2024 to 30.11.2024] AE(HQs) Contractual Junior Engineer ORD/000708/2024-2025 803/AE/HQ 30/09/2024 61 MD HASIN 0.80 0.67 83.75 0
2876 PURBA BARDHAMAN Memari-I Central Mechanical MAGRA PIPED WATER SUPPLY SCHEME IN MEMARI-1 BLOCK , SM/13491 New Supply and installation of Electro-Magnetic flow meter at HARIGRAM, KUCHUT & others water supply scheme under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. ASSISTANT ENGINEER Junior Engineer ORD/000564/2024-2025 3103/CMD 11/12/2024 60 S DUTTA 15.06 0.00 0 0
2877 PURBA BARDHAMAN Memari-I Burdwan Division MAGRA PIPED WATER SUPPLY SCHEME IN MEMARI-1 BLOCK , SM/13491 New Continuation work for Supply of one no. Diesel / LPG / CNG driven Motor Cab / Maxi Cab (Air Condition) on hire basis for the office of the Superintending Engineer, Central Circle, P.H.E. Dte. to be used by the Deputy Superintending Engineer, Central Circle, P.H.E. Dte. [Period from 01.06.2025 to 31.07.2025] AE(HQs), Burdwan Division, PHE Dte. Contractual Junior Engineer ORD/000167/2025-2026 689/AE/HQ 30/05/2025 61 MD HASIN 0.80 0.00 0 0
2878 PURBA BARDHAMAN Memari-I Burdwan Division MAGRA PIPED WATER SUPPLY SCHEME IN MEMARI-1 BLOCK , SM/13491 New Continuation work for Supply of one no. Diesel / LPG / CNG driven Motor Cab / Maxi Cab (Air Condition) on hire basis for the office of the Superintending Engineer, Central Circle, P.H.E. Dte. to be used by the Deputy Superintending Engineer, Central Circle, P.H.E. Dte. [Period from 01.04.2025 to 31.05.2025] AE(HQs) Contractual Junior Engineer ORD/001404/2024-2025 455/AE/HQ 28/03/2025 61 MD HASIN 0.80 0.37 46.25 0
2879 PURBA BARDHAMAN Memari-I Burdwan Division MAGRA PIPED WATER SUPPLY SCHEME IN MEMARI-1 BLOCK , SM/13491 New Restoration of Conc. road, Providing leftout FHTC with extension of Pipeline, construction of Pathway, drain, repairing of Pump House at Head Work site with allied works for MAGRA, SANUI, SATGACHIA Zone-I & NARAGOHALIA PIPED WATER SUPPLY SCHEME, Block-Memari-I, within Burdwan Sub Division under Burdwan Division PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/001192/2024-2025 611/BWD 11/02/2025 180 M/S ASHA CONSTRUCTION 354.13 0.00 0 25
2880 PURBA BARDHAMAN Memari-I Burdwan Division MAGRA PIPED WATER SUPPLY SCHEME IN MEMARI-1 BLOCK , SM/13491 New Continuation work for Supply of one no. Diesel / LPG / CNG driven Motor Cab / Maxi Cab (Air Condition) on hire basis for the office of the Superintending Engineer, Central Circle, P.H.E. Dte. to be used by the Deputy Superintending Engineer, Central Circle, P.H.E. Dte. [Period from 01.10.2025 to 30.11.2025] Contractual Junior Engineer ORD/000700/2025-2026 1194/AE/HQ 24/09/2025 61 MD HASIN 0.80 0.00 0 0
2881 PURBA BARDHAMAN Memari-I Burdwan Division MAGRA PIPED WATER SUPPLY SCHEME IN MEMARI-1 BLOCK , SM/13491 New Continuation work for Supply of one no. Diesel / LPG / CNG driven Motor Cab / Maxi Cab (Air Condition) on hire basis for the office of the Superintending Engineer, Central Circle, P.H.E. Dte. to be used by the Deputy Superintending Engineer, Central Circle, P.H.E. Dte. [Period from 01.08.2025 to 30.09.2025] AE(HQs), Burdwan Division, PHE Dte. Contractual Junior Engineer ORD/000527/2025-2026 1034/AE/HQ 01/08/2025 61 MD HASIN 0.80 0.00 0 0
2882 PURBA BARDHAMAN Memari-I Burdwan Division MAGRA PIPED WATER SUPPLY SCHEME IN MEMARI-1 BLOCK , SM/13491 New Continuation work for Supply of one no. Diesel / LPG / CNG driven Motor Cab / Maxi Cab (Air Condition) on hire basis for the office of the Superintending Engineer, Central Circle, P.H.E. Dte. to be used by the Deputy Superintending Engineer, Central Circle, P.H.E. Dte. [Period from 01.12.2025 to 31.01.2026] Contractual Junior Engineer ORD/000800/2025-2026 1280/AE/HQ 01/12/2025 62 MD HASIN 0.80 0.00 0 0
2883 PURBA BARDHAMAN Purbasthali-I Burdwan Division LAKSHAMPUR PIPED WATER SUPPLY SCHEME , SM/13493 New Material Requisition To Resource Division RTOR000166/2023-2024 2155/BWD 10/05/2023 0 Resource Division 6.59 0.00 0 0
2884 PURBA BARDHAMAN Purbasthali-I Burdwan Division LAKSHAMPUR PIPED WATER SUPPLY SCHEME , SM/13493 New Material Requisition To Resource Division RTOR000413/2023-2024 3867/BWD 01/09/2023 0 Resource Division 0.14 0.00 0 0
2885 PURBA BARDHAMAN Purbasthali-I Burdwan Division LAKSHAMPUR PIPED WATER SUPPLY SCHEME , SM/13493 New Material Requisition To Resource Division RTOR000394/2023-2024 2197/BWD 12/05/2023 0 Resource Division 12.66 0.00 0 0
2886 PURBA BARDHAMAN Purbasthali-I Central Mechanical LAKSHAMPUR PIPED WATER SUPPLY SCHEME , SM/13493 New Addl. quotation for new service connection charges for Laxmanpur PWSS BILL/01459/2023-2024 BP-2023-24-157 11/09/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 0.54 0.00 0 0
2887 PURBA BARDHAMAN Purbasthali-I Central Mechanical LAKSHAMPUR PIPED WATER SUPPLY SCHEME , SM/13493 New New service connection charges for Lakshampur PWSS TW-1 BILL/00752/2023-2024 BP-2023-24-55 14/07/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 5.74 0.00 0 0
2888 PURBA BARDHAMAN Purbasthali-I Burdwan Division LAKSHAMPUR PIPED WATER SUPPLY SCHEME , SM/13493 New LAKSHAMPUR Piped Water Supply Scheme with sinking of Tube-well, LDS, Rising Main, FHTC, with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drain and internal pathway at different TW site under Purbasthali-I Block, District:- Purba-Bardhaman [NEW SCHEME]. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000799/2022-2023 1518/BWD 28/03/2023 90 JAHAR GHOSH 42.34 37.88 89.47 40
2889 PURBA BARDHAMAN Purbasthali-I Burdwan Division LAKSHAMPUR PIPED WATER SUPPLY SCHEME , SM/13493 New Different Types of work involved in connection with Augmentation of RAHATPUR (SM/16306) & LAKSHMANPUR (SM/13493) Piped water supply scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000176/2024-2025 2069/BWD 07/06/2024 240 SAIKAT RAY 213.73 0.00 0 2
2890 PURBA BARDHAMAN Purbasthali-I Central Mechanical LAKSHAMPUR PIPED WATER SUPPLY SCHEME , SM/13493 New Withdrawing of pump motor set due to low discharge and installation of new pump motor set at Lakshampur PH 1 water supply scheme under CMD P.H.E. Dte. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/001891/2023-2024 363/CMSD 28/02/2024 15 C.M. ENTERPRISE 0.67 0.00 0 0
2891 PURBA BARDHAMAN Purbasthali-I Central Mechanical LAKSHAMPUR PIPED WATER SUPPLY SCHEME , SM/13493 New New service connection for Laxmanpur PWSS PH-1 BILL/02315/2023-2024 BP-2023-24-454 30/01/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 2.01 0.00 0 0
2892 PURBA BARDHAMAN Purbasthali-I Central Mechanical LAKSHAMPUR PIPED WATER SUPPLY SCHEME , SM/13493 New Supply & Installation of Submersible Pumping Machinery , Voltage Stabilizer, Chlorination system and internal House wiring for Tube well no.- 1 & 2 at LAKSHAMPUR Water Supply Scheme [Block - PURBASTHALI-1] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000124/2023-2024 2639/CMD 14/06/2023 30 C.M. ENTERPRISE 20.81 9.35 44.93 60
2893 PURBA BARDHAMAN Purbasthali-I Central Mechanical LAKSHAMPUR PIPED WATER SUPPLY SCHEME , SM/13493 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Manganpur & others water supply scheme under Purbasthali 1 Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000714/2024-2025 2979/CMD 25/11/2024 90 H.K. DAS & CO. 53.27 0.00 0 0
2894 PURBA BARDHAMAN Katwa-II Burdwan Division AKHRA PIPED WATER SUPPLY SCHEME , SM/14057 New Material Requisition To Resource Division RTOR000179/2023-2024 2155/BWD 10/05/2023 0 Resource Division 14.84 0.00 0 0
2895 PURBA BARDHAMAN Katwa-II Burdwan Division AKHRA PIPED WATER SUPPLY SCHEME , SM/14057 New Material Requisition To Resource Division RTOR000630/2023-2024 4882/BWD 10/11/2023 0 Resource Division 26.00 0.00 0 0
2896 PURBA BARDHAMAN Katwa-II Burdwan Division AKHRA PIPED WATER SUPPLY SCHEME , SM/14057 New Material Requisition To Resource Division RTOR000493/2023-2024 4017/BWD 08/09/2023 0 Resource Division 23.30 0.00 0 0
2897 PURBA BARDHAMAN Katwa-II Central Mechanical AKHRA PIPED WATER SUPPLY SCHEME , SM/14057 New New service connection charges for Akhra PWSS TW-1 BILL/00756/2023-2024 BP-2023-24-56 17/07/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 4.96 0.00 0 0
2898 PURBA BARDHAMAN Katwa-II Central Mechanical AKHRA PIPED WATER SUPPLY SCHEME , SM/14057 New New service connection charges for Akhra PWSS TW-2 BILL/00757/2023-2024 BP-2023-24-57 17/07/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 2.39 0.00 0 0
2899 PURBA BARDHAMAN Katwa-II Burdwan Division AKHRA PIPED WATER SUPPLY SCHEME , SM/14057 New AKHARA Piped Water Supply Scheme with sinking of Tube-well, LDS, Rising Main, FHTC, Construction of 250 cum capacity RCC OHR with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drain and internal pathway at different TW site under KATWA-II Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer JUNIOR ENGINEER KATWA SUB-DIVISION PHE DTE ORD/000011/2023-2024 1725/BWD 13/04/2023 629 MANASH GHOSH 455.23 405.69 89.12 78
2900 PURBA BARDHAMAN Katwa-II Central Mechanical AKHRA PIPED WATER SUPPLY SCHEME , SM/14057 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Mulgram & others water supply scheme under Katwa-II Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. ASSISTANT ENGINEER Junior Engineer ORD/000070/2024-2025 2409/CMD 02/08/2024 90 DUTTA ENTERPRISE 50.18 0.00 0 0
2901 PURBA BARDHAMAN Katwa-II Central Mechanical AKHRA PIPED WATER SUPPLY SCHEME , SM/14057 New Hiring of Inspection Vehicle (Diesel/CNG/LPG Driven) for supervision of site for the office of Assistant Engineer, under C.M.D. P.H.E. Dte. w.e.f.- 01/11/2023 to 31/12/2023. [Under JJM Works]. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/001302/2023-2024 859/CMSD 30/10/2023 61 SUBRATA BHADRA 0.80 0.79 98.75 100
2902 PURBA BARDHAMAN Khandaghosh Burdwan Division KHEJURHATI PIPED WATER SUPPLY SCHEME , SM/14952 New Material Requisition To Resource Division RTOR000107/2023-2024 1965/BWD 26/04/2023 0 Resource Division 2.84 0.00 0 0
2903 PURBA BARDHAMAN Khandaghosh Burdwan Division KHEJURHATI PIPED WATER SUPPLY SCHEME , SM/14952 New Material Requisition To Resource Division RTOR000195/2023-2024 2155/BWD 10/05/2023 0 Resource Division 2.96 0.00 0 0
2904 PURBA BARDHAMAN Khandaghosh Burdwan Division KHEJURHATI PIPED WATER SUPPLY SCHEME , SM/14952 New Material Requisition To Resource Division RTOR000724/2023-2024 5276/BWD 30/11/2023 0 Resource Division 21.07 0.00 0 0
2905 PURBA BARDHAMAN Khandaghosh Central Mechanical KHEJURHATI PIPED WATER SUPPLY SCHEME , SM/14952 New New service connection charges for Khejurhati PWSS TW 2 BILL/01532/2023-2024 BP-2023-24-200 17/10/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 4.02 0.00 0 0
2906 PURBA BARDHAMAN Khandaghosh Central Mechanical KHEJURHATI PIPED WATER SUPPLY SCHEME , SM/14952 New New service connection charges for Khejurhati PWSS TW-1 BILL/01540/2023-2024 BP-2023-24-207 30/10/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 2.78 0.00 0 0
2907 PURBA BARDHAMAN Khandaghosh Central Mechanical KHEJURHATI PIPED WATER SUPPLY SCHEME , SM/14952 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at Khejurhati Water Supply Scheme [ Block- Khandoghosh ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER Junior Engineer ORD/000390/2023-2024 3662/CMD 01/08/2023 30 SINHA ELECTRICALS 28.98 23.76 81.99 98
2908 PURBA BARDHAMAN Khandaghosh Burdwan Division KHEJURHATI PIPED WATER SUPPLY SCHEME , SM/14952 New Different works related (sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of different capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site) to CHAGRAM & KHEJURHATI Piped Water Supply Scheme under Khandaghosh Block, District:- Purba Bardhaman [NEW SCHEME] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer1, Durgapur Sub-Division, PHE Dte.,Junior Engineer2, Durgapur Sub-Division, PHE Dte. ORD/000083/2023-2024 2080/BWD 04/05/2023 698 KHAN ENTERPRISE 688.15 198.49 28.84 58
2909 PURBA BARDHAMAN Khandaghosh Central Mechanical KHEJURHATI PIPED WATER SUPPLY SCHEME , SM/14952 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at KHEJURHATI & others water supply scheme under Khandoghosh Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman ASSISTANT ENGINEER Junior Engineer ORD/000071/2024-2025 2391/CMD 02/08/2024 90 C.M. ENTERPRISE 45.81 0.00 0 10
2910 PURBA BARDHAMAN Khandaghosh Burdwan Division KHEJURHATI PIPED WATER SUPPLY SCHEME , SM/14952 New Balance work for providing Functional Household Tap Connection (FHTC) within the command area KHEJURHATI & GUIR W/S. Scheme of Khandaghosh Block under Burdwan Division, PHE. Dte. Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/001217/2024-2025 724/BWD 24/02/2025 120 ROY CONSTRUCTION 153.99 0.00 0 0
2911 PURBA BARDHAMAN Memari-II Burdwan Division BARAPALASHAN PIPED WATER SUPPLY SCHEME , SM/13423 New Material Requisition To Resource Division RTOR000234/2023-2024 2197/BWD 12/05/2023 0 Resource Division 23.40 0.00 0 0
2912 PURBA BARDHAMAN Memari-II Burdwan Division BARAPALASHAN PIPED WATER SUPPLY SCHEME , SM/13423 New Material Requisition To Resource Division RTOR000501/2023-2024 4025/BWD 08/09/2023 0 Resource Division 6.08 0.00 0 0
2913 PURBA BARDHAMAN Memari-II Burdwan Division BARAPALASHAN PIPED WATER SUPPLY SCHEME , SM/13423 New Material Requisition To Resource Division RTOR000653/2023-2024 5099/BWD 23/11/2023 0 Resource Division 20.46 0.00 0 0
2914 PURBA BARDHAMAN Memari-II Central Mechanical BARAPALASHAN PIPED WATER SUPPLY SCHEME , SM/13423 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at NOAHATI & others water supply scheme under Memari-II Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. ASSISTANT ENGINEER Junior Engineer ORD/000102/2024-2025 2395/CMD 02/08/2024 90 S.G. TECHNICAL SERVICES 36.99 0.00 0 0
2915 PURBA BARDHAMAN Memari-II Burdwan Division BARAPALASHAN PIPED WATER SUPPLY SCHEME , SM/13423 New Continuation work order for "Supply of one No. Diesel Driven Ambassador Car on hire basis for the office of the Assistant Engineer, Burdwan Sub-Division, PHE Dte. (Period from 01-06-2024 to 31-08-2024" JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000228/2024-2025 918/BSD 28/05/2024 92 SK. ASFIA 1.20 0.00 0 60
2916 PURBA BARDHAMAN Memari-II Central Mechanical BARAPALASHAN PIPED WATER SUPPLY SCHEME , SM/13423 New New service connection at Barapalasan PWSS TW -2 BILL/02331/2023-2024 BP-2023-24-448 29/01/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 5.18 0.00 0 0
2917 PURBA BARDHAMAN Memari-II Central Mechanical BARAPALASHAN PIPED WATER SUPPLY SCHEME , SM/13423 New New service connection at Barapalasan PWSS TW -1. BILL/02332/2023-2024 BP-2023-24-447 29/01/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.90 0.00 0 0
2918 PURBA BARDHAMAN Memari-II Burdwan Division BARAPALASHAN PIPED WATER SUPPLY SCHEME , SM/13423 New BARA PALASHAN Piped Water Supply Scheme with sinking of Tube-well, LDS, Rising Main, FHTC, Construction of 250 cum capacity RCC OHR with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drain and internal pathway at different TW site under Memari-II Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER RWS BURDWAN SUB-DIVISION PHE DTE ORD/000111/2023-2024 2300/BWD 19/05/2023 867 MLG CONSTRUCTION 358.59 159.02 44.35 65
2919 PURBA BARDHAMAN Memari-II Burdwan Division BARAPALASHAN PIPED WATER SUPPLY SCHEME , SM/13423 New Continuation Work Order for Supply of one No.Diesel Driven Ambassador Car No. WB:41H-4009 on hire basis for the office of the Assistant Engineer,Burdwan Sub-Division,PHE Dte(Period from 01-03-2025 to 31.05.2025) Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/001407/2024-2025 457/BSD 28/02/2025 90 SK. ASFIA 1.20 0.00 0 100
2920 PURBA BARDHAMAN Burdwan-II Central Mechanical Kusha Piped Water Supply Scheme , SM/13279 New Hiring of Inspection Vehicle (Diesel/CNG/LPG Driven) for supervision of site for the office of Assistant Engineer, under C.M.D. P.H.E. Dte. w.e.f.-01/07/2023 to 31/08/2023. [Under JJM Works]. ASSISTANT ENGINEER Junior Engineer ORD/000321/2023-2024 523/A/CMSD-I 28/06/2023 62 SUBRATA BHADRA 0.79 0.76 96.2 50
2921 PURBA BARDHAMAN Burdwan-II Burdwan Division Kusha Piped Water Supply Scheme , SM/13279 New Additional laying distribution system work for KUSHA W/S. Scheme under Burdwan - II Block within Burdwan Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. Junior Engineer, Burdwan Sadar Sub-Division ORD/000434/2023-2024 3386/BWD 03/08/2023 60 RICK CONSTRUCTION 39.84 39.84 100 100
2922 PURBA BARDHAMAN Burdwan-II Burdwan Division Kusha Piped Water Supply Scheme , SM/13279 New Material Requisition To Resource Division RTOR000013/2023-2024 1962/BWD 25/04/2023 0 Resource Division 2.48 0.00 0 0
2923 PURBA BARDHAMAN Burdwan-II Burdwan Division Kusha Piped Water Supply Scheme , SM/13279 New Material Requisition To Resource Division RTOR000069/2022-2023 1250/BWD 17/03/2023 0 Resource Division 6.52 0.00 0 0
2924 PURBA BARDHAMAN Burdwan-II Burdwan Division Kusha Piped Water Supply Scheme , SM/13279 New Material Requisition To Resource Division RTOR000726/2023-2024 5270/BWD 30/11/2023 0 Resource Division 21.07 0.00 0 0
2925 PURBA BARDHAMAN Burdwan-II Central Mechanical Kusha Piped Water Supply Scheme , SM/13279 New New Service connection charges for Kusha W/S Scheme TW-I BILL/00573/2023-2024 BP-2023-24-9 12/05/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 9.07 0.00 0 0
2926 PURBA BARDHAMAN Burdwan-II Central Mechanical Kusha Piped Water Supply Scheme , SM/13279 New New Service connection charges for Kusha W/S Scheme TW-II BILL/00574/2023-2024 BP-2023-24-10 12/05/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 0.41 0.00 0 0
2927 PURBA BARDHAMAN Burdwan-II Central Mechanical Kusha Piped Water Supply Scheme , SM/13279 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at Kusha Water Supply Scheme [Block- Burdwan-2] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER Junior Engineer ORD/000034/2023-2024 2470/CMD 30/05/2023 30 SUBRATA BHADRA 28.71 23.98 83.52 60
2928 PURBA BARDHAMAN Burdwan-II Central Mechanical Kusha Piped Water Supply Scheme , SM/13279 New Supply & delivery of standby Submersible pumping machinery & automatic Chlorinator for Kusha & others water supply scheme, under CMD, P.H.E. Dte., Dist.- Purba Bardhaman ASSISTANT ENGINEER Junior Engineer ORD/001412/2023-2024 150/CMSD 22/01/2024 15 SUBRATA BHADRA 1.76 1.76 100 100
2929 PURBA BARDHAMAN Burdwan-II Burdwan Division Kusha Piped Water Supply Scheme , SM/13279 New KUSHA Piped Water Supply Scheme with sinking of Tube-well, LDS, Rising Main, FHTC, Construction of 150 cum capacity RCC OHR with 20.0 mtr. with Staging height including soil investigation & construction of switch-rooms & boundary walls at different TW site under Bardhaman-II Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. Junior Engineer, Burdwan Sadar Sub-Division ORD/000671/2022-2023 389/BWD. 31/01/2023 791 SYED KHORSED ALAM 250.51 234.57 93.64 75
2930 PURBA BARDHAMAN Burdwan-II Central Mechanical Kusha Piped Water Supply Scheme , SM/13279 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at KUSHA & others water supply scheme under Bardhaman-II Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman ASSISTANT ENGINEER Junior Engineer ORD/000065/2024-2025 2389/CMD 02/08/2024 90 DILIP MAHATO 53.14 0.00 0 12
2931 PURBA BARDHAMAN Burdwan-II Burdwan Division Kusha Piped Water Supply Scheme , SM/13279 New Designing, making and erection of Sign Board for SWAJAL GRAM in Korar village of Burdwan-II Block under Kusha Piped Water Supply Scheme within Burdwan Sub-Division under Burdwan Division, PHE Dte (5 nos Board) Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. Junior Engineer, Burdwan Sadar Sub-Division ORD/000612/2025-2026 2356/BSD 21/08/2025 10 MANABSEBA PROKALPA & CONSTRUCTIONS 0.72 0.00 0 100
2932 PURBA BARDHAMAN Burdwan-I Burdwan Division MALKITA PIPED WATER SUPPLY SINGLE VILLAGE SCHEME , SM/14080 New Material Requisition To Resource Division RTOR000442/2023-2024 3834/BWD 01/09/2023 0 Resource Division 5.48 0.00 0 0
2933 PURBA BARDHAMAN Burdwan-I Burdwan Division MALKITA PIPED WATER SUPPLY SINGLE VILLAGE SCHEME , SM/14080 New Material Requisition To Resource Division RTOR000677/2023-2024 5052/BWD 23/11/2023 0 Resource Division 20.46 0.00 0 0
2934 PURBA BARDHAMAN Burdwan-I Central Mechanical MALKITA PIPED WATER SUPPLY SINGLE VILLAGE SCHEME , SM/14080 New New service connection charges for Malkita PWSS TW-1 BILL/00837/2023-2024 BP-2023-24-102 04/08/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 4.26 0.00 0 0
2935 PURBA BARDHAMAN Burdwan-I Central Mechanical MALKITA PIPED WATER SUPPLY SINGLE VILLAGE SCHEME , SM/14080 New New service connection charges for Malkita PWSS TW-2 BILL/00838/2023-2024 BP-2023-24-103 04/08/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.25 0.00 0 0
2936 PURBA BARDHAMAN Burdwan-I Central Mechanical MALKITA PIPED WATER SUPPLY SINGLE VILLAGE SCHEME , SM/14080 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at MALKITA & others water supply scheme under Bardhaman-I Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman ASSISTANT ENGINEER Junior Engineer ORD/000066/2024-2025 2388/CMD 02/08/2024 90 ELECTRICAL & MECHANICAL ENGINEERING CORPORATION 55.95 0.00 0 0
2937 PURBA BARDHAMAN Burdwan-I Burdwan Division MALKITA PIPED WATER SUPPLY SINGLE VILLAGE SCHEME , SM/14080 New MALKITA Single Village Scheme with sinking of Tube-well & construction of switch rooms & boundary walls with gates and land development, drain and internal pathway at different TW site under Burdwan-I Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000054/2023-2024 1933/BWD 24/04/2023 90 GHOSH CONSTRUCTION 49.99 49.95 99.92 100
2938 PURBA BARDHAMAN Burdwan-I Burdwan Division MALKITA PIPED WATER SUPPLY SINGLE VILLAGE SCHEME , SM/14080 New MALKITA Single Village Scheme with LDS, Rising Main and FHTC under Burdwan-I Block, District:- Purba-Bardhaman [NEW SCHEME]. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000158/2023-2024 2454/BWD 31/05/2023 90 M/S PURBASHA 71.78 71.76 99.97 72
2939 PURBA BARDHAMAN Burdwan-I Burdwan Division MALKITA PIPED WATER SUPPLY SINGLE VILLAGE SCHEME , SM/14080 New Conducting physical Household Survey at the IMIS reported village for HGJ certification and providing balance FHTC for Har Ghar Jal certification including conducting Gram Sabhas for different IMIS reported villages across the district under Burdwan Division, PHE Dte. AE(HQs),Assistant Engineer ,Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE.,Assistant Engineer, Durgapur Sub Division, P.H.E. Dte JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000428/2024-2025 3107/BWD 12/08/2024 323 TUBGRAM GRAMMYAK UNNAYAN SAMITY 309.60 0.00 0 85
2940 PURBA BARDHAMAN Burdwan-I Burdwan Division MALKITA PIPED WATER SUPPLY SINGLE VILLAGE SCHEME , SM/14080 New Installation of Sluice Valve, Washout Valve to regulate water supply with Road Restoration work, Extension pipeline and providing FHTC for MALKITA Piped Water Supply Scheme, Block- Burdwan-I, under Burdwan sub Division within Burdwan Division PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/001163/2024-2025 552/BWD 04/02/2025 90 M/S PURBASHA 9.62 0.00 0 0
2941 PURBA BARDHAMAN Burdwan-I Burdwan Division MALKITA PIPED WATER SUPPLY SINGLE VILLAGE SCHEME , SM/14080 New Designing, making and erection of Sign Board for SWAJAL GRAM in Malkita village of Burdwan-I Block under Malkita Piped Water Supply Scheme within Burdwan Sub-Division under Burdwan Division, PHE Dte (5 nos. Board) Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE,Junior Engineer, Burdwan Sadar Sub-Division ORD/000486/2025-2026 2358/BSD 21/08/2025 10 MANABSEBA PROKALPA & CONSTRUCTIONS 0.72 0.00 0 100
2942 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of kalyanpur Piped Water Supply Scheme at Kalna-II Block , SM/07806 Retrofitting Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Kalyanpur (Part) village, Kalyan (Part) habitation of Kalyanpur piped water supply scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. (Part-A)[SL NO.-07] Assistant Engineer ORD/000691/2020-2021 57/BWD 05/01/2021 15 SETH ENTERPRISE 4.86 9.73 200.21 1
2943 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of kalyanpur Piped Water Supply Scheme at Kalna-II Block , SM/07806 Retrofitting Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Kalyanpur (Part) village (Kalyanpur Part habitation) of Kalyanpur piped water supply scheme within Kalna Sub-Division under Burdwan Division, PHE Dte.(Part-B)[SL NO.-08] Assistant Engineer ORD/000744/2020-2021 58/BWD 05/01/2021 15 BISHWAJIT DAS 4.86 9.72 200 1
2944 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of kalyanpur Piped Water Supply Scheme at Kalna-II Block , SM/07806 Retrofitting Sinking of 250 X 150mm dia Tube Well 150 mtr. Depth by D.R. Rig method using UPVC pipe (CM) and UPVC Deep Well Screen (RMS) for 2nd TW Site of KALYANPUR & its adjoining mouzas Piped Water Supply Scheme, Block ? Kalna ? II, Dist - Purba Bardhaman under Burdwan Division, PHE Dte. Assistant Engineer ORD/000546/2022-2023 5128/BWD 21/11/2022 30 MUNSHI ENTERPRISE 8.72 8.16 93.58 100
2945 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of kalyanpur Piped Water Supply Scheme at Kalna-II Block , SM/07806 Retrofitting Digital structurization of pipeline alignment and asset evaluation including holistic design, preparation of design drawings of overall LDS & preparation of estimate for 03 Nos. Piped W/S. Schemes under Kalna II Block under Kalna Sub-Division under Burdwan Division, PHE. Dte. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000336/2024-2025 3016/BWD 05/08/2024 20 HORIZEN 7.55 2.52 33.38 100
2946 PURBA BARDHAMAN Bhatar Burdwan Division KARJJANA PIPED WATER SUPPLY SCHEME , SM/15244 New Material Requisition To Resource Division RTOR000081/2022-2023 1248/BWD 17/03/2023 0 Resource Division 1.91 0.00 0 0
2947 PURBA BARDHAMAN Bhatar Burdwan Division KARJJANA PIPED WATER SUPPLY SCHEME , SM/15244 New Material Requisition To Resource Division RTOR000751/2023-2024 5248/BWD 30/11/2023 0 Resource Division 18.50 0.00 0 0
2948 PURBA BARDHAMAN Bhatar Central Mechanical KARJJANA PIPED WATER SUPPLY SCHEME , SM/15244 New New service connection charges for Karjjana PWSS TW-1 BILL/00753/2023-2024 BP-2023-24-53 18/07/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 2.66 0.00 0 0
2949 PURBA BARDHAMAN Bhatar Central Mechanical KARJJANA PIPED WATER SUPPLY SCHEME , SM/15244 New New service connection charges for Karjjana PWSS TW-2 BILL/00754/2023-2024 BP-2023-24-54 14/07/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 5.43 0.00 0 0
2950 PURBA BARDHAMAN Bhatar Central Mechanical KARJJANA PIPED WATER SUPPLY SCHEME , SM/15244 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Karjana & others water supply scheme under Bhatar Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000067/2024-2025 2394/CMD 02/08/2024 90 AHALYA ENGINEERING WORKS 82.00 0.00 0 0
2951 PURBA BARDHAMAN Bhatar Burdwan Division KARJJANA PIPED WATER SUPPLY SCHEME , SM/15244 New KARJJANA [PART :-A] Piped Water Supply Scheme with sinking of Tube-well, LDS, Rising Main, FHTC & construction of switch rooms & boundary walls with gates and land development, drain and internal pathway at different TW site under Bhatar Block, District:- Purba-Bardhaman [NEW SCHEME]. Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer ORD/000721/2022-2023 955/BWD 03/03/2023 60 DHIRENDRANATH SOM 44.51 35.31 79.33 100
2952 PURBA BARDHAMAN Bhatar Burdwan Division KARJJANA PIPED WATER SUPPLY SCHEME , SM/15244 New KARJJANA [PART :-B] Piped Water Supply Scheme with sinking of Tube-well, LDS, Rising Main, FHTC & construction of switch rooms & boundary walls with gates and land development, drain and internal pathway at different TW site under Bhatar Block, District:- Purba-Bardhaman [NEW SCHEME]. Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer ORD/000722/2022-2023 956/BWD 03/03/2023 60 DHIRENDRANATH SOM 45.79 30.55 66.72 95
2953 PURBA BARDHAMAN Bhatar Central Mechanical KARJJANA PIPED WATER SUPPLY SCHEME , SM/15244 New New service connection for KARJANA PWSS, PH-2. BILL/02486/2023-2024 BP-2023-24-535 15/02/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 1.06 0.00 0 0
2954 PURBA BARDHAMAN Memari-II Burdwan Division BAMUNPUKUR PIPED WATER SUPPLY SCHEME , SM/14930 New Material Requisition To Resource Division RTOR000227/2023-2024 2155/BWD 10/05/2023 0 Resource Division 8.19 0.00 0 0
2955 PURBA BARDHAMAN Memari-II Burdwan Division BAMUNPUKUR PIPED WATER SUPPLY SCHEME , SM/14930 New Material Requisition To Resource Division RTOR000545/2023-2024 4299/BWD 29/09/2023 0 Resource Division 9.65 0.00 0 0
2956 PURBA BARDHAMAN Memari-II Burdwan Division BAMUNPUKUR PIPED WATER SUPPLY SCHEME , SM/14930 New Material Requisition To Resource Division RTOR000650/2023-2024 5112/BWD 23/11/2023 0 Resource Division 20.46 0.00 0 0
2957 PURBA BARDHAMAN Memari-II Burdwan Division BAMUNPUKUR PIPED WATER SUPPLY SCHEME , SM/14930 New Continuation order for "Supply of one No. Diesel Driven Ambassador Car on hire basis for the office of the Assistant Engineer, Burdwan Sub-Division, PHE Dte for the period of 01.12.2023 to 31.05.2024 Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/001007/2023-2024 2751/BSD 28/11/2023 183 SK.ASFIA 2.40 0.40 16.67 70
2958 PURBA BARDHAMAN Memari-II Central Mechanical BAMUNPUKUR PIPED WATER SUPPLY SCHEME , SM/14930 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at NOAHATI & others water supply scheme under Memari-II Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. ASSISTANT ENGINEER Junior Engineer ORD/000102/2024-2025 2395/CMD 02/08/2024 90 S.G. TECHNICAL SERVICES 36.99 0.00 0 0
2959 PURBA BARDHAMAN Memari-II Burdwan Division BAMUNPUKUR PIPED WATER SUPPLY SCHEME , SM/14930 New Restoration Work of damage portion of the RIDF road from Bilbari to Farakpur for PHE pipe laying work within MEMARI-II BLOCK IN THE DISTRICT OF PURBABARDHAMAN BILL/00978/2024-2025 1052/JJM 13/11/2024 0 EXECUTIVE ENGINEER (WBSRDA) PURBA BARDHAMAN DIVISION 23.03 0.00 0 0
2960 PURBA BARDHAMAN Memari-II Central Mechanical BAMUNPUKUR PIPED WATER SUPPLY SCHEME , SM/14930 New New service connection for Bamunpukur PWSS TW 1. BILL/02439/2023-2024 BP-2023-24-524 09/02/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 2.99 0.00 0 0
2961 PURBA BARDHAMAN Memari-II Central Mechanical BAMUNPUKUR PIPED WATER SUPPLY SCHEME , SM/14930 New New service connection for Bamunpukur PWSS of PH-1 BILL/02352/2023-2024 BP-2023-24-471 31/01/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 8.81 0.00 0 0
2962 PURBA BARDHAMAN Memari-II Central Mechanical BAMUNPUKUR PIPED WATER SUPPLY SCHEME , SM/14930 New Quotation for new service connection at Bamunpukur PWSS TW-2. BILL/00932/2024-2025 BP-2024-25-349 05/10/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 5.45 0.00 0 0
2963 PURBA BARDHAMAN Memari-II Burdwan Division BAMUNPUKUR PIPED WATER SUPPLY SCHEME , SM/14930 New BAMUNPUKUR Piped Water Supply Scheme with sinking of Tube-well, LDS, Rising Main, FHTC, Construction of 300 cum capacity RCC OHR with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drain and internal pathway at different TW site under Memari-II Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER RWS BURDWAN SUB-DIVISION PHE DTE ORD/000112/2023-2024 2301/BWD 19/05/2023 866 MLG CONSTRUCTION 447.89 161.47 36.05 62
2964 PURBA BARDHAMAN Memari-II Central Mechanical BAMUNPUKUR PIPED WATER SUPPLY SCHEME , SM/14930 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at Bamunpukur Water Supply Scheme [ Block- Memari-2 ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER Junior Engineer ORD/000710/2023-2024 4021/CMD 29/08/2023 703 DUTTA ENTERPRISE 29.38 0.00 0 50
2965 PURBA BARDHAMAN Memari-II Burdwan Division BAMUNPUKUR PIPED WATER SUPPLY SCHEME , SM/14930 New Continuation Work Order for supply of inspection Vehicle No. WB42Y- 7403 for inspection of different JJM related(schemes) works as and when required including supply of driver & fuel(minimum 8 hours duty per day) and all taxes etc. for Burdwan Sub Division under Burdwan Division, PHE Dte consider 96.00 Km. run per day (Period from 01-02-2025 to 30-04-2025) JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/001402/2024-2025 240/BSD 31/01/2025 66 PARVIN BEGAM 0.85 0.28 32.94 100
2966 PURBA BARDHAMAN Raina-I Burdwan Division CHAKPUROHIT PIPED WATER SUPPLY SCHEME , SM/14978 New Material Requisition To Resource Division RTOR000269/2023-2024 2197/BWD 12/05/2023 0 Resource Division 9.34 0.00 0 0
2967 PURBA BARDHAMAN Raina-I Burdwan Division CHAKPUROHIT PIPED WATER SUPPLY SCHEME , SM/14978 New Material Requisition To Resource Division RTOR000485/2023-2024 4009/BWD 08/09/2023 0 Resource Division 1.37 0.00 0 0
2968 PURBA BARDHAMAN Raina-I Burdwan Division CHAKPUROHIT PIPED WATER SUPPLY SCHEME , SM/14978 New Material Requisition To Resource Division RTOR000661/2023-2024 5102/BWD 23/11/2023 0 Resource Division 20.46 0.00 0 0
2969 PURBA BARDHAMAN Raina-I Central Mechanical CHAKPUROHIT PIPED WATER SUPPLY SCHEME , SM/14978 New New service connection charges for Chakpurohit PWSS TW-2 BILL/01666/2023-2024 BP-2023-24-221 10/11/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 5.93 0.00 0 0
2970 PURBA BARDHAMAN Raina-I Central Mechanical CHAKPUROHIT PIPED WATER SUPPLY SCHEME , SM/14978 New New service connection charges for Chakpurohit PWSS TW-1 BILL/01527/2023-2024 BP-2023-24-192 11/10/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.90 0.00 0 0
2971 PURBA BARDHAMAN Raina-I Burdwan Division CHAKPUROHIT PIPED WATER SUPPLY SCHEME , SM/14978 New CHAK PUROHIT Piped Water Supply Scheme with sinking of Tube-well, LDS, Construction of 150 cum RCC OHR with 20 mtr. staging height including soil testing, Rising Main, FHTC & construction of switch rooms & boundary walls with gates and land development, drain and internal pathway at different TW site under Raina-I Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000197/2023-2024 2702/BWD 08/06/2023 300 M/S PROCHESTA ENTERPRISE 263.18 222.45 84.52 80
2972 PURBA BARDHAMAN Raina-I Burdwan Division CHAKPUROHIT PIPED WATER SUPPLY SCHEME , SM/14978 New Continuation Work Order for supply of inspection Vehicle for inspection of different JJM related(schemes)works as and when required including supply of driver & fuel(minimum 8 hours duty per day) and all taxes etc. for Burdwan Sub-Division under Burdwan Division,PHE Dte consider 96.00 Km. run per day (Period from 01-05-2024 to 31-07-2024) JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000108/2024-2025 807/BSD 29/04/2024 66 PARVIN BEGAM 0.85 0.28 32.94 100
2973 PURBA BARDHAMAN Raina-I Central Mechanical CHAKPUROHIT PIPED WATER SUPPLY SCHEME , SM/14978 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Bajitpur, Belsar & other water supply scheme under Raina-1 Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000117/2024-2025 2589/CMD 27/08/2024 90 DEY ENTERPRISE 74.58 0.00 0 10
2974 PURBA BARDHAMAN Raina-I Burdwan Division CHAKPUROHIT PIPED WATER SUPPLY SCHEME , SM/14978 New Balance work [i.e. Extension or parallel Pipeline, Leftout FHTC, Road Restoration work, Sinking of Additional Tube Well with Pump House & Boundary wall, inter Connection of Additional Tube Well, Construction of M.S.Structural bridge, canal Crossing, MS casing with allied work of Bhagabatipur, Machkhara, Udgara, Bantir, Chakpurohit Rasuikhanda, Sankarpur, Gopalpur & Belshar PWSS Block-RAINA- I under Burdwan Sub Division, PHE Dte. within Burdwan Division PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/001103/2024-2025 469/BWD 24/01/2025 366 SK ALIM 1,353.91 0.00 0 25
2975 PURBA BARDHAMAN Ketugram-I Burdwan Division SHRIGRAM PIPED WATER SUPPLY SCHEME , SM/14915 New Material Requisition To Resource Division RTOR000312/2023-2024 2197/BWD 12/05/2023 0 Resource Division 12.32 0.00 0 0
2976 PURBA BARDHAMAN Ketugram-I Burdwan Division SHRIGRAM PIPED WATER SUPPLY SCHEME , SM/14915 New Material Requisition To Resource Division RTOR000486/2023-2024 4010/BWD 08/09/2023 0 Resource Division 0.28 0.00 0 0
2977 PURBA BARDHAMAN Ketugram-I Burdwan Division SHRIGRAM PIPED WATER SUPPLY SCHEME , SM/14915 New Material Requisition To Resource Division RTOR000760/2023-2024 5245/BWD 30/11/2023 0 Resource Division 18.90 0.00 0 0
2978 PURBA BARDHAMAN Ketugram-I Burdwan Division SHRIGRAM PIPED WATER SUPPLY SCHEME , SM/14915 New SHRIGRAM Piped Water Supply Scheme with sinking of Tube-well, LDS, Rising Main, FHTC, Construction of 200 cum capacity RCC OHR with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drain and internal pathway at different TW site under KETUGRAM -I Block, District:- Purba- Bardhaman [NEW SCHEME] Assistant Engineer JUNIOR ENGINEER R.W.S. BURDWAN SUB-DIVISION PHE DTE ORD/000141/2023-2024 2385/BWD 23/05/2023 365 S.D. CONSTRUCTION 351.47 129.40 36.82 43
2979 PURBA BARDHAMAN Ketugram-I Central Mechanical SHRIGRAM PIPED WATER SUPPLY SCHEME , SM/14915 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Rajur & others water supply scheme under Ketugram-I Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. Driller In-Charge Junior Engineer ORD/000098/2024-2025 2407/CMD 02/08/2024 90 M.S. ENTERPRISE 82.29 0.00 0 0
2980 PURBA BARDHAMAN Ketugram-I Central Mechanical SHRIGRAM PIPED WATER SUPPLY SCHEME , SM/14915 New Quotation for new service connection at Shrigram PWSS PH-2. BILL/00416/2024-2025 BP-2024-25-222 26/07/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 4.77 0.00 0 0
2981 PURBA BARDHAMAN Ketugram-I Central Mechanical SHRIGRAM PIPED WATER SUPPLY SCHEME , SM/14915 New Quotation for new service connection at Shrigram PWSS PH-1. BILL/00417/2024-2025 BP-2024-25-221 26/07/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.40 0.00 0 0
2982 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF PURBASTHALI SURFACE WATER BASED PWSS ZONE III , SM/15588 Augmentation Material Requisition To Resource Division RTOR000517/2023-2024 3969/BWD 08/09/2023 0 Resource Division 28.36 0.00 0 0
2983 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF PURBASTHALI SURFACE WATER BASED PWSS ZONE III , SM/15588 Augmentation Work Order for "Route Survey & Prepatration of DPR for Augmentation of Purbasthali Surface Water Based PWSS Zone-III (Zone-III A) (SM/15588) under Kalna Sub-Division under Burdwan Division, PHE Dte." (SL-4) Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/001137/2023-2024 2079/KSD 29/02/2024 45 APEX ENGINEERING 2.27 0.00 0 100
2984 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF PURBASTHALI SURFACE WATER BASED PWSS ZONE III , SM/15588 Augmentation Material Requisition To Resource Division RTOR000763/2023-2024 197/BWD 10/01/2024 0 Resource Division 6.16 0.00 0 0
2985 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF PURBASTHALI SURFACE WATER BASED PWSS ZONE III , SM/15588 Augmentation Augmentation of PURBASTHALI Surface Water Supply Scheme (ZONE-3A) with LDS, Rising Main, FHTC, Construction of 500 cum capacity RCC OHR with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drain and internal pathway at different TW site under Purbasthali-II Block, District:- Purba-Bardhaman. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000537/2023-2024 3701/BWD 24/08/2023 860 SUPRITI ENTERPRISE 560.35 0.00 0 1
2986 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF PURBASTHALI SURFACE WATER BASED PWSS ZONE III , SM/15588 Augmentation Supply & Laying of 300mm Dia M.S.E.R.W Pipe including Jack Pushing along with other allied work in connection with different Augmentation & New [(SM/18439, SM/14437, SM/14435, SM/07805, SM/14440, SM/15571, SM/08030, SM/16014, SM/15588, SM/16298 & SM/16307)] under Kalna Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/001187/2024-2025 608/BWD 11/02/2025 361 MANASH GHOSH 1,209.62 0.00 0 51
2987 PURBA BARDHAMAN Ketugram-I Central Drilling PANDUGRAM PIPED WATER SUPPLY SCHEME , SM/15160 New Providing drilling crew and other allied works for construction of Tube Well (250mm X200mm X 114 Mtrs. Depth) by utilising Departmental Machineries for Pandugram W/S Scheme (T/W-I & II) , Ketugram-I Block under PurbaBardhman District, Central Drilling Division, P.H.E. Dte. Driller In Charge Junior Engineer ORD/000169/2023-2024 1347/CDD 13/09/2023 30 M/S S.K.GHOSH & CO. 16.67 0.00 0 0
2988 PURBA BARDHAMAN Ketugram-I Burdwan Division PANDUGRAM PIPED WATER SUPPLY SCHEME , SM/15160 New Material Requisition To Resource Division RTOR000012/2023-2024 1962/BWD 25/04/2023 0 Resource Division 0.69 0.00 0 0
2989 PURBA BARDHAMAN Ketugram-I Burdwan Division PANDUGRAM PIPED WATER SUPPLY SCHEME , SM/15160 New Material Requisition To Resource Division RTOR000362/2023-2024 2197/BWD 12/05/2023 0 Resource Division 17.57 0.00 0 0
2990 PURBA BARDHAMAN Ketugram-I Burdwan Division PANDUGRAM PIPED WATER SUPPLY SCHEME , SM/15160 New Material Requisition To Resource Division RTOR000627/2023-2024 4873/BWD 10/11/2023 0 Resource Division 29.60 0.00 0 0
2991 PURBA BARDHAMAN Ketugram-I Central Mechanical PANDUGRAM PIPED WATER SUPPLY SCHEME , SM/15160 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Rajur & others water supply scheme under Ketugram-I Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. Driller In-Charge Junior Engineer ORD/000098/2024-2025 2407/CMD 02/08/2024 90 M.S. ENTERPRISE 82.29 0.00 0 0
2992 PURBA BARDHAMAN Ketugram-I Burdwan Division PANDUGRAM PIPED WATER SUPPLY SCHEME , SM/15160 New Balance work for OHR, extension of pipeline to provide FHTC with sinking of tube well, construction of pump house, boundary wall, land development, plinth protection for pump house, approach road & other related work under Ankhona, Pandugram, Sripur PWSS under Katwa Sub Division, Block- Ketugram-I, Burdwan Division PHE Dte. Assistant Engineer JUNIOR ENGINEER R.W.S. BURDWAN SUB-DIVISION PHE DTE ORD/000286/2024-2025 2738/BWD 12/07/2024 173 PUSPA ENTERPRISE 128.29 0.00 0 75
2993 PURBA BARDHAMAN Ketugram-I Central Mechanical PANDUGRAM PIPED WATER SUPPLY SCHEME , SM/15160 New New electric connection for Pandugram PWSS, PH-1. BILL/01875/2023-2024 BP-2023-24-378 16/01/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 5.98 0.00 0 0
2994 PURBA BARDHAMAN Ketugram-I Central Mechanical PANDUGRAM PIPED WATER SUPPLY SCHEME , SM/15160 New New service connection charges for Pandugram PWSS TW-2 BILL/01724/2023-2024 BP-2023-24-253 07/12/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 1.61 0.00 0 0
2995 PURBA BARDHAMAN Ketugram-I Central Mechanical PANDUGRAM PIPED WATER SUPPLY SCHEME , SM/15160 New Quotation for burnt meter problem at Pandugram PWSS TW-2 BILL/00937/2024-2025 BP-2024-25-408 11/12/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 0.07 0.00 0 0
2996 PURBA BARDHAMAN Ketugram-I Burdwan Division PANDUGRAM PIPED WATER SUPPLY SCHEME , SM/15160 New Different works related (sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of different capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site) to ANKHONA, PANDUGRAM & SRIPUR Piped Water Supply Scheme under KETUGRAM¿I Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer JUNIOR ENGINEER R.W.S. BURDWAN SUB-DIVISION PHE DTE ORD/000436/2023-2024 3388/BWD 03/08/2023 882 PUSPA ENTERPRISE 989.13 172.08 17.4 50
2997 PURBA BARDHAMAN Burdwan Division AUGUMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR HATGOBINDAPUR , SM/15175 Augmentation Preparation and Submission of DPR for Augmentation of Hatgobindapur PWSS under Burdwan-II Development Block under Burdwan Division, P.H.E Dte.[2nd Call] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. Junior Engineer, Burdwan Sadar Sub-Division ORD/000350/2023-2024 1477/BSD 12/07/2023 15 MEASURE LAND 0.78 0.77 98.72 100
2998 PURBA BARDHAMAN Burdwan Division AUGUMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR HATGOBINDAPUR , SM/15175 Augmentation Crossing of Bardhaman-Kalna Road near Hatgobindapur College More with 150 mm dia. pipeline through pushing of 600 mm. dia. RCC casing pipe by hydraulic jacking method for Hatgobindapur W/S. Scheme under Burdwan Division, PHE. Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. Junior Engineer, Burdwan Sadar Sub-Division ORD/001199/2024-2025 644/BWD 17/02/2025 10 I.S. ENTERPRISE 5.57 0.00 0 0
2999 PURBA BARDHAMAN Burdwan Division AUGUMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR HATGOBINDAPUR , SM/15175 Augmentation Designing, making and erection of Sign Board for SWAJAL GRAM in Banagram village of Burdwan-II Block under Hatgobindapur Piped Water Supply Scheme within Burdwan Sub-Division under Burdwan Division, PHE Dte (5 nos Board) Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. Junior Engineer, Burdwan Sadar Sub-Division ORD/000488/2025-2026 2347/BSD 21/08/2025 10 MANABSEBA PROKALPA & CONSTRUCTIONS 0.72 0.00 0 100
3000 PURBA BARDHAMAN Burdwan Division AUGUMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR HATGOBINDAPUR , SM/15175 Augmentation Designing, making and erection of Sign Board for SWAJAL GRAM in Ramnagar village of Burdwan-II Block under Hatgobindapur Piped Water Supply Scheme within Burdwan Sub-Division under Burdwan Division, PHE Dte(5 nos Board) Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. Junior Engineer, Burdwan Sadar Sub-Division ORD/000501/2025-2026 2348/BSD 21/08/2025 10 MANABSEBA PROKALPA & CONSTRUCTIONS 0.72 0.00 0 100
3001 PURBA BARDHAMAN Burdwan Division AUGUMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR HATGOBINDAPUR , SM/15175 Augmentation Designing, making and erection of Sign Board for SWAJAL GRAM in Hatkanda village of Burdwan-II Block under Hatgobindapur Piped Water Supply Scheme within Burdwan Sub-Division under Burdwan Division, PHE Dte. (5 nos. Board) Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. Junior Engineer, Burdwan Sadar Sub-Division ORD/000489/2025-2026 2360/BSD 21/08/2025 10 MANABSEBA PROKALPA & CONSTRUCTIONS 0.72 0.00 0 100
3002 PURBA BARDHAMAN Central Mechanical AUGMENTATION OF SATGACHIA ZONE-II (PART-B) , SM/15182 Augmentation Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination system and internal House wiring for Tube well no.- 1 & 2 at Augmentation of SATGACHIA(Z-II, Part-B)[MEMARI-II] Water Supply Scheme under CMD, PHE Dte., Dist.- Purba-Bardhaman. ORD/001075/2023-2024 4199/CMD 29/08/2023 30 DAS TRADING CO. 24.41 0.00 0 0
3003 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF SATGACHIA ZONE-II (PART-B) , SM/15182 Augmentation Sinking of Tube-well, construction of switch rooms & Rising main at 3RD TW site for SATGACHIA ZONE-II Piped Water Supply Scheme under MEMARI-II Block, District:- Purba-Bardhaman. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000899/2023-2024 5357/BWD 06/12/2023 60 J K CORPORATION 20.10 0.00 0 0
3004 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF SATGACHIA ZONE-II (PART-B) , SM/15182 Augmentation Construction of boundary wall and Land development with approach road including internal drain at 2ND TW site for SATGACHIA ZONE-II PWSS under Memari-II Block, District:- Purba-Bardhaman. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000948/2023-2024 5595/BWD 20/12/2023 30 GOUTAM KUMAR MITRA 5.09 5.08 99.8 100
3005 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF SATGACHIA ZONE-II (PART-B) , SM/15182 Augmentation Restoration of Pump House at Head Work site of SATGACHIA ZONE-II Piped water supply scheme at Memari-II Block under Burdwan Division, Dist.-Purba Bardhaman. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000137/2024-2025 1002/BSD 06/06/2024 30 SAANVI ENTERPRISE 0.96 0.95 98.96 10
3006 PURBA BARDHAMAN Central Mechanical AUGMENTATION OF SATGACHIA ZONE-II (PART-B) , SM/15182 Augmentation Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Zone- I & II, Tube well No.- I (Replacement tube well) at Satgachia Water Supply Scheme [ BLOCK- Memari-2] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER Junior Engineer ORD/000531/2024-2025 3071/CMD 03/12/2024 60 NABAUDYOG ELECTRICAL ENGINEERING CO-OPERATIVE SOCIETY LTD 25.34 0.00 0 95
3007 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF SATGACHIA ZONE-II (PART-B) , SM/15182 Augmentation Different Types of work involved in connection with different Augmentation & Retrofitting Schemes (06 Nos.) Piped Water Supply Scheme under Memari II Block within Burdwan Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/001269/2024-2025 848/BWD 05/03/2025 120 PROJECT INDIA 394.29 0.00 0 0
3008 PURBA BARDHAMAN Kalna-II Central Mechanical KASIPUR PIPED WATER SUPPLY SCHEME , SM/16019 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at KASIPUR Water Supply Scheme [ Block- KALNA-2] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000899/2023-2024 4163/CMD 29/08/2023 30 P.K. ENGINEERING 28.59 0.00 0 0
3009 PURBA BARDHAMAN Kalna-II Burdwan Division KASIPUR PIPED WATER SUPPLY SCHEME , SM/16019 New Material Requisition To Resource Division RTOR000081/2023-2024 1962/BWD 25/04/2023 0 Resource Division 31.64 0.00 0 0
3010 PURBA BARDHAMAN Kalna-II Burdwan Division KASIPUR PIPED WATER SUPPLY SCHEME , SM/16019 New Material Requisition To Resource Division RTOR000374/2023-2024 2197/BWD 12/05/2023 0 Resource Division 6.85 0.00 0 0
3011 PURBA BARDHAMAN Kalna-II Central Mechanical KASIPUR PIPED WATER SUPPLY SCHEME , SM/16019 New New service at Kasipur PWSS TW-2. BILL/02293/2023-2024 BP-2023-24-439 29/01/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 4.72 0.00 0 0
3012 PURBA BARDHAMAN Kalna-II Burdwan Division KASIPUR PIPED WATER SUPPLY SCHEME , SM/16019 New Different works related (sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of different capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site) to KASIPUR, PATHAR GHATA & SABIDPUR Piped Water Supply Scheme under Kalna ¿ II Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000541/2023-2024 3697/BWD 24/08/2023 770 SUPRITI ENTERPRISE 1,185.67 164.63 13.88 42
3013 PURBA BARDHAMAN Kalna-II Burdwan Division KASIPUR PIPED WATER SUPPLY SCHEME , SM/16019 New Different Types of work involved in connection with Augmentation of 6 Nos. [(SM/07827), (SM/07866), (SM/16196), (SM/18314), (SM/16021), (SM/16019)] Piped Water Supply Scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/001144/2024-2025 618/BWD 11/02/2025 180 M/S DATTA ENTERPRISE 578.09 0.00 0 0
3014 PURBA BARDHAMAN Kalna-II Central Mechanical KASIPUR PIPED WATER SUPPLY SCHEME , SM/16019 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Khargakur & others water supply scheme under Kalna-2 Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000116/2024-2025 2393/CMD 02/08/2024 280 HANNAN BUILDERS PVT LTD 76.80 0.00 0 20
3015 PURBA BARDHAMAN Kalna-II Burdwan Division KASIPUR PIPED WATER SUPPLY SCHEME , SM/16019 New Road restoration work for implementation of KASIPUR PWSS (SM/16019) within Kalna Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/001167/2024-2025 559/BWD 06/02/2025 90 SUPRITI ENTERPRISE 9.43 0.00 0 100
3016 PURBA BARDHAMAN Kalna-II Burdwan Division SABIDPUR PIPED WATER SUPPLY SCHEME , SM/16021 New Material Requisition To Resource Division RTOR000088/2023-2024 1962/BWD 25/04/2023 0 Resource Division 36.67 0.00 0 0
3017 PURBA BARDHAMAN Kalna-II Burdwan Division SABIDPUR PIPED WATER SUPPLY SCHEME , SM/16021 New Material Requisition To Resource Division RTOR000276/2023-2024 2197/BWD 12/05/2023 0 Resource Division 22.30 0.00 0 0
3018 PURBA BARDHAMAN Kalna-II Burdwan Division SABIDPUR PIPED WATER SUPPLY SCHEME , SM/16021 New Work Order for "CONSTRUCTION OF TEMPORARY KIOSK FOR THE NECESSARY ARRANGEMENT OF ELECTRIFICATION OF TUBEWELL FOR SABIDPUR PWSS UNDER KALNA SUB-DIVISION UNDER BURDWAN DIVISION, PHE DTE." Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/001154/2023-2024 2150/KSD 07/03/2024 10 ER CONSTRUCTION & GENERAL ORDER SUPPLIER 0.66 0.66 100 2
3019 PURBA BARDHAMAN Kalna-II Central Mechanical SABIDPUR PIPED WATER SUPPLY SCHEME , SM/16021 New Quotation for new electric service connection at Sabidpur PH NO.-1 BILL/01748/2023-2024 BP-2023-24-255 07/12/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 5.37 0.00 0 0
3020 PURBA BARDHAMAN Kalna-II Central Mechanical SABIDPUR PIPED WATER SUPPLY SCHEME , SM/16021 New New service connection for SABIDPUR PWSS TW-2. BILL/02400/2023-2024 BP-2023-24-502 06/02/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 7.96 0.00 0 0
3021 PURBA BARDHAMAN Kalna-II Burdwan Division SABIDPUR PIPED WATER SUPPLY SCHEME , SM/16021 New Different works related (sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of different capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site) to KASIPUR, PATHAR GHATA & SABIDPUR Piped Water Supply Scheme under Kalna ¿ II Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000541/2023-2024 3697/BWD 24/08/2023 770 SUPRITI ENTERPRISE 1,185.67 172.30 14.53 42
3022 PURBA BARDHAMAN Kalna-II Central Mechanical SABIDPUR PIPED WATER SUPPLY SCHEME , SM/16021 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at SABIDPUR Water Supply Scheme [ Block- KALNA-2 ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. [2nd CALL] ASSISTANT ENGINEER JUNIOR ENGINEER ORD/001045/2023-2024 4193/CMD 29/08/2023 732 M/S. S.R. ENTERPRISE 27.74 0.00 0 95
3023 PURBA BARDHAMAN Kalna-II Burdwan Division SABIDPUR PIPED WATER SUPPLY SCHEME , SM/16021 New Different Types of work involved in connection with Augmentation of 6 Nos. [(SM/07827), (SM/07866), (SM/16196), (SM/18314), (SM/16021), (SM/16019)] Piped Water Supply Scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/001144/2024-2025 618/BWD 11/02/2025 180 M/S DATTA ENTERPRISE 578.09 0.00 0 0
3024 PURBA BARDHAMAN Kalna-II Central Mechanical SABIDPUR PIPED WATER SUPPLY SCHEME , SM/16021 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Khargakur & others water supply scheme under Kalna-2 Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000116/2024-2025 2393/CMD 02/08/2024 280 HANNAN BUILDERS PVT LTD 76.80 0.00 0 20
3025 PURBA BARDHAMAN Kalna-II Central Mechanical SABIDPUR PIPED WATER SUPPLY SCHEME , SM/16021 New CONTINUATION ORDER-Hiring of inspection vehicle (Diesel/CNG/LPG Driven) [bearing no. WB41H5741] for supervision of the site for the office of the Assistant Engineer,CMD,PHE,Dte.[w.e.f-01.06.2025 to 31.07.2025][JJM WORKS] ASSISTANT ENGINEER Junior Engineer ORD/000010/2025-2026 646/CMSD 26/05/2025 61 PRODYUT GHOSH 0.80 0.39 48.75 0
3026 PURBA BARDHAMAN Kalna-II Burdwan Division AKALPAUSH PIPE WATER SUPPLY SCHEME , SM/16485 New Material Requisition To Resource Division RTOR000201/2023-2024 2155/BWD 10/05/2023 0 Resource Division 20.78 0.00 0 0
3027 PURBA BARDHAMAN Kalna-II Burdwan Division AKALPAUSH PIPE WATER SUPPLY SCHEME , SM/16485 New Material Requisition To Resource Division RTOR000609/2023-2024 4914/BWD 10/11/2023 0 Resource Division 31.31 0.00 0 0
3028 PURBA BARDHAMAN Kalna-II Burdwan Division AKALPAUSH PIPE WATER SUPPLY SCHEME , SM/16485 New Material Requisition To Resource Division RTOR000053/2023-2024 1962/BWD 25/04/2023 0 Resource Division 34.71 0.00 0 0
3029 PURBA BARDHAMAN Kalna-II Burdwan Division AKALPAUSH PIPE WATER SUPPLY SCHEME , SM/16485 New Different works related (sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of different capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site) to AKALPAUSH & BIRUHA Piped Water Supply Scheme under Kalna ¿ II Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000542/2023-2024 3698/BWD 24/08/2023 365 SUPRITI ENTERPRISE 1,010.87 274.49 27.15 37
3030 PURBA BARDHAMAN Kalna-II Burdwan Division AKALPAUSH PIPE WATER SUPPLY SCHEME , SM/16485 New Work Order for "CONSTRUCTION OF TEMPORARY KIOSK FOR THE NECESSARY ARRANGEMENT OF ELECTRIFICATION OF TUBEWELL FOR AKALPOUSH PWSS UNDER KALNA SUB-DIVISION UNDER BURDWAN DIVISION, PHE DTE." Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/001146/2023-2024 2095/KSD 04/03/2024 10 BISWAS ENTERPRISE 0.66 0.66 100 2
3031 PURBA BARDHAMAN Kalna-II Burdwan Division AKALPAUSH PIPE WATER SUPPLY SCHEME , SM/16485 New Material Requisition To Resource Division RTOR000783/2023-2024 330/BWD 24/01/2024 0 Resource Division 13.92 0.00 0 0
3032 PURBA BARDHAMAN Kalna-II Burdwan Division AKALPAUSH PIPE WATER SUPPLY SCHEME , SM/16485 New RESTORATION WORK OF KALNA BAIDYAPUR ROAD TO AKALPOUSH HC ROAD FROM 0.00 KM TO 1.50 KM (IN STRETCHES )DAMAGED DUE TO LAYING OF UNDERGROUND WATER PIPELINEBY PHE WITH BOX CUTTING AND JHAMA WITH MOORUM CONSOLIDATION UNDR KALNA HIGHWAY SUB DIVISION OF BURDWAN SOUTH HIGHWAY DIVISION P.W.(ROADS) DTE.. DURING YEAR 2023-2024. BILL/00646/2024-2025 825/JJM 13/09/2024 0 EXECUTIVE ENGINEER BURDWAN SOUTH HIGHWAY DIVISION P.W. (ROADS) DTE. 1.85 0.00 0 0
3033 PURBA BARDHAMAN Kalna-II Central Mechanical AKALPAUSH PIPE WATER SUPPLY SCHEME , SM/16485 New New Service connection at Akalpoush PWSS PH-2 BILL/02322/2023-2024 BP-2023-24-452 30/01/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 6.25 0.00 0 0
3034 PURBA BARDHAMAN Kalna-II Central Mechanical AKALPAUSH PIPE WATER SUPPLY SCHEME , SM/16485 New New Service connection at Akalpoush PWSS PH-1 BILL/02321/2023-2024 BP-2023-24-451 30/01/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.42 0.00 0 0
3035 PURBA BARDHAMAN Kalna-II Central Mechanical AKALPAUSH PIPE WATER SUPPLY SCHEME , SM/16485 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at AKALPAUSH Water Supply Scheme [ Block-KALNA-2 ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. [3rd CALL] ASSISTANT ENGINEER JUNIOR ENGINEER ORD/001055/2023-2024 4190/CMD 29/08/2023 30 AMUSAR IMPEX PVT. LTD. 28.57 0.00 0 100
3036 PURBA BARDHAMAN Kalna-II Central Mechanical AKALPAUSH PIPE WATER SUPPLY SCHEME , SM/16485 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Khargakur & others water supply scheme under Kalna-2 Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000116/2024-2025 2393/CMD 02/08/2024 280 HANNAN BUILDERS PVT LTD 76.80 0.00 0 20
3037 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED WATER SUPPLY SCHEME FOR JAUGRAM , SM/15602 Augmentation Laying of HDPE pipes with installation & construction of new valve chambers to control the flow of water within command area of JOUGRAM Piped W/S. Scheme at Jougram habitation, Jamalpur Block under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000761/2022-2023 1292/BWD 20/03/2023 30 DIPAK SARKAR 18.24 18.23 99.95 1
3038 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED WATER SUPPLY SCHEME FOR JAUGRAM , SM/15602 Augmentation Construction of 400 cum capacity 20 Mtr. staging height RCC Over Head Reservoir including pile foundation, pipe connection and cost of pipes, specials for JOUGRAM & It's Adjoining Mouzas W/S. scheme under Burdwan Sub-Division, Burdwan Division, P.H.E. Dte. Ref. Drawing No.PC-I/OHR/11/2012 (Sheet No.1&2)(R-I) Dated 20.06.2012. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. Junior Engineer, R.W.S. Burdwan Sub Division, P.H.E. Dt ORD/000020/2021-2022 3114/BWD 02/06/2021 180 SATYANARAYAN ENGINEERS CO. OP. SOCIETY LTD. 90.26 90.26 100 100
3039 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED WATER SUPPLY SCHEME FOR JAUGRAM , SM/15602 Augmentation Laying of Rising Main with interconnection of OHR and distribution line for JAUGRAM Piped Water Supply Scheme and its adjoining mouzas within Jamalpur Block under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000763/2022-2023 1297/BWD 21/03/2023 30 GOUTAM DEY 5.55 5.54 99.82 100
3040 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED WATER SUPPLY SCHEME FOR JAUGRAM , SM/15602 Augmentation Augmentation of JAUGRAM Piped Water Supply Scheme LDS, FHTC, land development, drain at different TW site under JAMALPUR Block, District:- Purba-Bardhaman. AE(HQs) Junior Engineer, Burdwan Division ORD/000171/2023-2024 3059/BWD 17/07/2023 682 SATYANARAYAN ENGINEERS CO. OP. SOCIETY LTD. 406.76 121.76 29.93 50
3041 PURBA BARDHAMAN Central Mechanical AUGMENTATION OF NADANGHAT PIPED WATER SUPPLY SCHEME , SM/16298 Augmentation Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination system and internal House wiring for Tube well no.- 1 & 2 at Augmentation of NADANGHAT[PURBASTHALI-I] Water Supply Scheme under CMD, PHE Dte., Dist.- Purba-Bardhaman. ORD/001082/2023-2024 4440/CMD 04/10/2023 30 S.K. ENTERPRISE 24.39 0.00 0 0
3042 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF NADANGHAT PIPED WATER SUPPLY SCHEME , SM/16298 Augmentation Augmentation of NADANGHAT PWSS to accommodate FHTC, Laying Distribution System, Laying Rising Main, under Jal Jeevan Mission of Purbasthali - I Block, Purba Burdwan District under Burdwan Division, PHE. Dte. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000077/2023-2024 2043/BWD 03/05/2023 60 HAFIJUR RAHAMAN MIDYA 26.28 20.80 79.15 100
3043 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF NADANGHAT PIPED WATER SUPPLY SCHEME , SM/16298 Augmentation Laying of Rising Main and distribution system with FHTC work, sinking of tube wells with other allied works in connection with Augmentation of NADANGHAT Piped Water Supply Scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer ORD/000130/2024-2025 2066/BWD 07/06/2024 120 TIRUPATI ENTERPRISES 272.43 0.00 0 0
3044 PURBA BARDHAMAN Central Mechanical AUGMENTATION OF NADANGHAT PIPED WATER SUPPLY SCHEME , SM/16298 Augmentation Illumination arrangement at Nadanghat water supply scheme under Purbasthali-1 Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000403/2024-2025 2782/CMD 01/10/2024 60 SUBRATA BHADRA 16.18 0.00 0 0
3045 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF NADANGHAT PIPED WATER SUPPLY SCHEME , SM/16298 Augmentation Work Order for "Restoration and laying of HDPE Pipeline at 2nd Pump House adjacent to Dogachhia village of DOGACHHIA PWSS & Nadanghat PWSS (SM/16298) under Kalna Sub-Division under Burdwan Division, PHE Dte.". Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000554/2024-2025 774/KSD 12/07/2024 15 HAMID SK 0.96 0.92 95.83 100
3046 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF NADANGHAT PIPED WATER SUPPLY SCHEME , SM/16298 Augmentation Work Order for "Restoration and laying of HDPE Pipeline at 2nd Pump House adjacent to Parulia village of PARULIA PWSS & Nadanghat PWSS (SM/16298) under Kalna Sub-Division under Burdwan Division, PHE Dte." Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000553/2024-2025 773/KSD 12/07/2024 15 HAMID SK 0.96 0.96 100 100
3047 PURBA BARDHAMAN Central Mechanical AUGMENTATION OF NADANGHAT PIPED WATER SUPPLY SCHEME , SM/16298 Augmentation Quotation for load enhancement at Nadanghat PWSS PH 2. BILL/00225/2024-2025 BP-2024-25-116 28/05/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 0.89 0.00 0 0
3048 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF NADANGHAT PIPED WATER SUPPLY SCHEME , SM/16298 Augmentation Supply & Laying of 300mm Dia M.S.E.R.W Pipe including Jack Pushing along with other allied work in connection with different Augmentation & New [(SM/18439, SM/14437, SM/14435, SM/07805, SM/14440, SM/15571, SM/08030, SM/16014, SM/15588, SM/16298 & SM/16307)] under Kalna Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/001187/2024-2025 608/BWD 11/02/2025 361 MANASH GHOSH 1,209.62 0.00 0 51
3049 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED NANDRA PIPE WATER SUPPLY SCHEME , SM/15725 Augmentation Preparation and Submission of DPR for Augmentation of Nandra PWSS under Burdwan-II Development Block under Burdwan Division, P.H.E Dte.[2nd Call] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. Junior Engineer, Burdwan Sadar Sub-Division ORD/000349/2023-2024 1476/BSD 12/07/2023 15 CARTO 0.78 0.77 98.72 100
3050 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED NANDRA PIPE WATER SUPPLY SCHEME , SM/15725 Augmentation Augmentation of NADRA Piped Water Supply Scheme Construction of 200 cum capacity RCC OHR with 20.0 mtr. with Staging height including soil investigation & Rising Main under BARDHAMAN-II Block, District:- Purba-Bardhaman. _2ND CALL ORD/000965/2023-2024 002/BWD 02/01/2024 180 R.G. INFRASTRUCTURE 72.79 0.00 0 0
3051 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED NANDRA PIPE WATER SUPPLY SCHEME , SM/15725 Augmentation Continuation Work for the supply of one no. Diesel driven Motor Cab/Maxi Cab (Air Conditioner) on hire basis for the office of the Assistant Engineer, to be used by the Assistant Engineer, RWS Burdwan Sub-Divn., PHE. Dte. (Period from 01/03/2024 to 30/04/2024) Contractual Junior Engineer,Junior Engineer, R.W.S. Burdwan Sub Division, P.H.E. Dt ORD/001222/2023-2024 62/RWS 27/02/2024 60 MD HASIN 0.80 0.55 68.75 0
3052 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED NANDRA PIPE WATER SUPPLY SCHEME , SM/15725 Augmentation Designing, making and erection of Sign Board for SWAJAL GRAM in Nandra village of Burdwan-II Block under Nandra Piped Water Supply Scheme within Burdwan Sub-Division under Burdwan Division, PHE Dte (5 nos Board) Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. Junior Engineer, Burdwan Sadar Sub-Division ORD/000484/2025-2026 2346/BSD 21/08/2025 10 MANABSEBA PROKALPA & CONSTRUCTIONS 0.72 0.00 0 100
3053 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED NANDRA PIPE WATER SUPPLY SCHEME , SM/15725 Augmentation Different type of works related internal pathways and approach road, land development, repair of boundary wall & pump houses and road restoration under NANDRA PWSS under Burdwan II Block under Burdwan Divn., PHE. Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000721/2025-2026 1404/BWD 16/05/2025 45 POMPA CONSTRUCTION CO. 5.89 0.00 0 0
3054 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED NANDRA PIPE WATER SUPPLY SCHEME , SM/15725 Augmentation Designing, making and erection of Sign Board for SWAJAL GRAM in Naopara village of Burdwan-II Block under Nandra Piped Water Supply Scheme within Burdwan Sub-Division under Burdwan Division, PHE Dte. (5 nos Board) Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. Junior Engineer, Burdwan Sadar Sub-Division ORD/000487/2025-2026 2359/BSD 21/08/2025 10 MANABSEBA PROKALPA & CONSTRUCTIONS 0.72 0.00 0 100
3055 PURBA BARDHAMAN Ketugram-II Burdwan Division LOHARUNDI PIPED WATER SUPPLY SCHEME , SM/16033 New Material Requisition To Resource Division RTOR000017/2023-2024 1962/BWD 25/04/2023 0 Resource Division 1.47 0.00 0 0
3056 PURBA BARDHAMAN Ketugram-II Burdwan Division LOHARUNDI PIPED WATER SUPPLY SCHEME , SM/16033 New Material Requisition To Resource Division RTOR000334/2023-2024 2197/BWD 12/05/2023 0 Resource Division 1.95 0.00 0 0
3057 PURBA BARDHAMAN Ketugram-II Burdwan Division LOHARUNDI PIPED WATER SUPPLY SCHEME , SM/16033 New Material Requisition To Resource Division RTOR000562/2023-2024 4936/BWD 10/11/2023 0 Resource Division 0.46 0.00 0 0
3058 PURBA BARDHAMAN Ketugram-II Burdwan Division LOHARUNDI PIPED WATER SUPPLY SCHEME , SM/16033 New Balance work for extension of pipeline to provide FHTC with land development, plinth protection for pump house under LOHARUNDI PWSS, Block-Ketugram-II under Katwa Sub Division within Burdwan Division PHE Dte. Assistant Engineer JUNIOR ENGINEER R.W.S. BURDWAN SUB-DIVISION PHE DTE ORD/000572/2024-2025 3313/BWD 06/09/2024 60 LAKSHMIKANTA DAS 9.88 0.00 0 0
3059 PURBA BARDHAMAN Ketugram-II Central Mechanical LOHARUNDI PIPED WATER SUPPLY SCHEME , SM/16033 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Kankurhati & others water supply scheme under Ketugram-2 Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. Driller In-Charge Junior Engineer ORD/000103/2024-2025 2408/CMD 02/08/2024 90 DIPALI CONSTRUCTION 41.95 0.00 0 0
3060 PURBA BARDHAMAN Ketugram-II Central Mechanical LOHARUNDI PIPED WATER SUPPLY SCHEME , SM/16033 New Quotation for new service connection at Loharudni PWSS PH-2. BILL/00347/2024-2025 BP-2024-25-169 01/07/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.37 0.00 0 0
3061 PURBA BARDHAMAN Ketugram-II Central Mechanical LOHARUNDI PIPED WATER SUPPLY SCHEME , SM/16033 New Supply & Installation of Submersible Pumping Machinery , Voltage Stabilizer, Chlorination system and internal House wiring for Tube well no.- 1 & 2 at LOHARUNDI [KETUGRAM-II] Water Supply Scheme under CMD, PHE Dte., Dist.- Purba-Bardhaman. Driller In-Charge JUNIOR ENGINEER ORD/000891/2023-2024 4154/CMD 29/08/2023 640 AMUSAR IMPEX PVT. LTD. 21.26 0.00 0 46
3062 PURBA BARDHAMAN Purbasthali-II Burdwan Division GHUNI PIPE WATER SUPPLY SCHEME , SM/16034 New Material Requisition To Resource Division RTOR000262/2023-2024 2197/BWD 12/05/2023 0 Resource Division 12.84 0.00 0 0
3063 PURBA BARDHAMAN Purbasthali-II Burdwan Division GHUNI PIPE WATER SUPPLY SCHEME , SM/16034 New Material Requisition To Resource Division RTOR000503/2023-2024 4027/BWD 08/09/2023 0 Resource Division 1.09 0.00 0 0
3064 PURBA BARDHAMAN Purbasthali-II Burdwan Division GHUNI PIPE WATER SUPPLY SCHEME , SM/16034 New Material Requisition To Resource Division RTOR000585/2023-2024 4929/BWD 10/11/2023 0 Resource Division 39.66 0.00 0 0
3065 PURBA BARDHAMAN Purbasthali-II Central Mechanical GHUNI PIPE WATER SUPPLY SCHEME , SM/16034 New Supply & Installation of Submersible Pumping Machinery , Voltage Stabilizer, Chlorination system and internal House wiring for Tube well no.- 1 & 2 at GHUNI [PURBASTHALI-II] Water Supply Scheme under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000889/2023-2024 4152/CMD 29/08/2023 30 S.K. ELECTRICALS 20.78 18.77 90.33 90
3066 PURBA BARDHAMAN Purbasthali-II Central Mechanical GHUNI PIPE WATER SUPPLY SCHEME , SM/16034 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Joykrishnapur & others water supply scheme under Purbasthali-2,jamalpur,kalna 1 Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000101/2024-2025 2398/CMD 02/08/2024 90 MS S G ENTERPRISE 53.43 0.00 0 0
3067 PURBA BARDHAMAN Purbasthali-II Burdwan Division GHUNI PIPE WATER SUPPLY SCHEME , SM/16034 New work Order "CONSTRUCTION OF TEMPORARY KIOSK FOR THE NECESSARY ARRANGEMENT OF ELECTRIFICATION OF TUBEWELL FOR GHUNI PWSS UNDER KALNA SUB-DIVISION UNDER BURDWAN DIVISION, PHE DTE.". Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000565/2024-2025 1014/KSD 07/08/2024 15 DEL DELTA CONSTRUCTION 0.66 0.66 100 100
3068 PURBA BARDHAMAN Purbasthali-II Central Mechanical GHUNI PIPE WATER SUPPLY SCHEME , SM/16034 New NEW SERVICE CONNECTION FOR GHUNI PIPED WATER SUPPLY SCHEME. BILL/02829/2023-2024 BP-2023-24-596 04/03/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 4.04 0.00 0 0
3069 PURBA BARDHAMAN Purbasthali-II Central Mechanical GHUNI PIPE WATER SUPPLY SCHEME , SM/16034 New NEW SERVICE CONNECTION FOR BILL/02826/2023-2024 BP-2023-24-595 04/03/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.93 0.00 0 0
3070 PURBA BARDHAMAN Purbasthali-II Burdwan Division GHUNI PIPE WATER SUPPLY SCHEME , SM/16034 New Different works related (sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of different capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site) to GHUNI & JOYKRISHNAPUR Piped Water Supply Scheme under Purbasthali II Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000492/2023-2024 3510/BWD 10/08/2023 808 BKB INFRA PROJECTS PRIVATE LIMITED 551.42 187.09 33.93 20
3071 PURBA BARDHAMAN Purbasthali-II Central Mechanical GHUNI PIPE WATER SUPPLY SCHEME , SM/16034 New CONTINUATION ORDER -Hiring of inspection vehicle (Diesel/CNG/LPG Driven) for supervision of site for the office of the Assistant engineer ,under CMD,PHE,Dte. [W.E.F-01/12/2024 to 30/01/2025] [Under JJM Works] ASSISTANT ENGINEER Junior Engineer ORD/000563/2024-2025 1377/CMSD 28/11/2024 61 PRODYUT GHOSH 0.80 0.79 98.75 0
3072 PURBA BARDHAMAN Burdwan-II Burdwan Division Balgana Piped Water Supply Scheme , SM/18326 New Material Requisition To Resource Division RTOR000224/2023-2024 2155/BWD 10/05/2023 0 Resource Division 3.74 0.00 0 0
3073 PURBA BARDHAMAN Burdwan-II Burdwan Division Balgana Piped Water Supply Scheme , SM/18326 New Material Requisition To Resource Division RTOR000402/2023-2024 3830/BWD 01/09/2023 0 Resource Division 19.80 0.00 0 0
3074 PURBA BARDHAMAN Burdwan-II Burdwan Division Balgana Piped Water Supply Scheme , SM/18326 New Material Requisition To Resource Division RTOR000648/2023-2024 5111/BWD 23/11/2023 0 Resource Division 20.46 0.00 0 0
3075 PURBA BARDHAMAN Burdwan-II Central Mechanical Balgana Piped Water Supply Scheme , SM/18326 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Replacement T.W of Bolgona Water Supply Scheme(H.W site) [ BLOCK- Bhatar] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000529/2024-2025 3069/CMD 03/12/2024 60 CHOUDHURY ENTERPRISE 18.41 0.00 0 0
3076 PURBA BARDHAMAN Burdwan-II Central Mechanical Balgana Piped Water Supply Scheme , SM/18326 New New service connection charges for Balgana PWSS TW-2 BILL/02206/2023-2024 BP-2023-24-403 17/01/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 4.86 0.00 0 0
3077 PURBA BARDHAMAN Burdwan-II Central Mechanical Balgana Piped Water Supply Scheme , SM/18326 New Quotation for new service connection at Augmentation of Balgona PWSS PH-4 BILL/00391/2024-2025 BP-2024-25-208 18/07/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 4.22 0.00 0 0
3078 PURBA BARDHAMAN Burdwan-II Central Mechanical Balgana Piped Water Supply Scheme , SM/18326 New New service connection charges for Balgona PWSS TW-1 BILL/01829/2023-2024 BP-2023-24-339 06/01/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 6.44 0.00 0 0
3079 PURBA BARDHAMAN Burdwan-II Burdwan Division Balgana Piped Water Supply Scheme , SM/18326 New Different works related (sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of different capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site) to BALGANA & GANGPUR Piped Water Supply Scheme under Burdwan ¿ II Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. Junior Engineer, Burdwan Sadar Sub-Division ORD/000538/2023-2024 3699/BWD 24/08/2023 769 SUPRITI ENTERPRISE 1,345.79 98.22 7.3 20
3080 PURBA BARDHAMAN Burdwan-II Central Mechanical Balgana Piped Water Supply Scheme , SM/18326 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at Balgana Water Supply Scheme [ Block- Burdwan-2 ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER Junior Engineer ORD/000669/2023-2024 4007/CMD 29/08/2023 581 GLACIER ENGINEERING CO 28.96 2.55 8.81 95
3081 PURBA BARDHAMAN Burdwan-II Central Mechanical Balgana Piped Water Supply Scheme , SM/18326 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at KUSHA & others water supply scheme under Bardhaman-II Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman ASSISTANT ENGINEER Junior Engineer ORD/000065/2024-2025 2389/CMD 02/08/2024 90 DILIP MAHATO 53.14 0.00 0 12
3082 PURBA BARDHAMAN Raina-I Burdwan Division BANTIR PIPED WATER SUPPLY SCHEME , SM/18300 New Material Requisition To Resource Division RTOR000230/2023-2024 2155/BWD 10/05/2023 0 Resource Division 16.06 0.00 0 0
3083 PURBA BARDHAMAN Raina-I Burdwan Division BANTIR PIPED WATER SUPPLY SCHEME , SM/18300 New Material Requisition To Resource Division RTOR000420/2023-2024 3862/BWD 01/09/2023 0 Resource Division 3.19 0.00 0 0
3084 PURBA BARDHAMAN Raina-I Burdwan Division BANTIR PIPED WATER SUPPLY SCHEME , SM/18300 New Material Requisition To Resource Division RTOR000652/2023-2024 5098/BWD 23/11/2023 0 Resource Division 20.46 0.00 0 0
3085 PURBA BARDHAMAN Raina-I Burdwan Division BANTIR PIPED WATER SUPPLY SCHEME , SM/18300 New BANTIR Piped Water Supply Scheme with sinking of Tube-well, LDS, Rising Main, FHTC, Construction of 400 cum capacity RCC OHR with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drain and internal pathway at different TW site under Raina-I Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000410/2023-2024 3255/BWD 27/07/2023 979 SK ALIM 797.64 494.04 61.94 76
3086 PURBA BARDHAMAN Raina-I Central Mechanical BANTIR PIPED WATER SUPPLY SCHEME , SM/18300 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at Bantir Water Supply Scheme [ Block- Raina-1 ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000718/2023-2024 4029/CMD 29/08/2023 520 M.S. ENTERPRISE 28.98 22.81 78.71 96
3087 PURBA BARDHAMAN Raina-I Central Mechanical BANTIR PIPED WATER SUPPLY SCHEME , SM/18300 New New service connection charges for Bantir PWSS TW-2 BILL/02198/2023-2024 BP-2023-24-402 17/01/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 7.33 0.00 0 0
3088 PURBA BARDHAMAN Raina-I Central Mechanical BANTIR PIPED WATER SUPPLY SCHEME , SM/18300 New New electric connection for Bantir PWSS, PH-1. BILL/01873/2023-2024 BP-2023-24-359 11/01/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.18 0.00 0 0
3089 PURBA BARDHAMAN Raina-I Burdwan Division BANTIR PIPED WATER SUPPLY SCHEME , SM/18300 New Continuation Work Order for supply of inspection Vehicle for inspection of different JJM related (schemes)works as and when required including supply of driver & fuel(minimum 8 hours duty per day) and all taxes etc. for Burdwan Sub-Division under Burdwan Division,PHE Dte consider 96.00 Km. run per day (Period from 01-08-2024 to 31-10-2024) JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000557/2024-2025 1500/BSD 30/07/2024 66 PARVIN BEGAM 0.85 0.28 32.94 100
3090 PURBA BARDHAMAN Raina-I Central Mechanical BANTIR PIPED WATER SUPPLY SCHEME , SM/18300 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Bajitpur, Belsar & other water supply scheme under Raina-1 Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000117/2024-2025 2589/CMD 27/08/2024 90 DEY ENTERPRISE 74.58 0.00 0 10
3091 PURBA BARDHAMAN Raina-I Burdwan Division BANTIR PIPED WATER SUPPLY SCHEME , SM/18300 New Balance work [i.e. Extension or parallel Pipeline, Leftout FHTC, Road Restoration work, Sinking of Additional Tube Well with Pump House & Boundary wall, inter Connection of Additional Tube Well, Construction of M.S.Structural bridge, canal Crossing, MS casing with allied work of Bhagabatipur, Machkhara, Udgara, Bantir, Chakpurohit Rasuikhanda, Sankarpur, Gopalpur & Belshar PWSS Block-RAINA- I under Burdwan Sub Division, PHE Dte. within Burdwan Division PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/001103/2024-2025 469/BWD 24/01/2025 366 SK ALIM 1,353.91 0.00 0 25
3092 PURBA BARDHAMAN Burdwan-I Central Mechanical BARASAT PIPED WATER SUPPLY SCHEME , SM/13906 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at Barasat Water Supply Scheme [ Block- Burdwan-1 ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER Junior Engineer ORD/000652/2023-2024 3995/CMD 29/08/2023 30 JAGANNATH ENTERPRISE 28.95 0.00 0 0
3093 PURBA BARDHAMAN Burdwan-I Burdwan Division BARASAT PIPED WATER SUPPLY SCHEME , SM/13906 New Material Requisition To Resource Division RTOR000092/2023-2024 1962/BWD 25/04/2023 0 Resource Division 7.63 0.00 0 0
3094 PURBA BARDHAMAN Burdwan-I Burdwan Division BARASAT PIPED WATER SUPPLY SCHEME , SM/13906 New Material Requisition To Resource Division RTOR000239/2023-2024 2197/BWD 12/05/2023 0 Resource Division 12.22 0.00 0 0
3095 PURBA BARDHAMAN Burdwan-I Burdwan Division BARASAT PIPED WATER SUPPLY SCHEME , SM/13906 New Material Requisition To Resource Division RTOR000710/2023-2024 5040/BWD 23/11/2023 0 Resource Division 20.46 0.00 0 0
3096 PURBA BARDHAMAN Burdwan-I Central Mechanical BARASAT PIPED WATER SUPPLY SCHEME , SM/13906 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at MALKITA & others water supply scheme under Bardhaman-I Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman ASSISTANT ENGINEER Junior Engineer ORD/000066/2024-2025 2388/CMD 02/08/2024 90 ELECTRICAL & MECHANICAL ENGINEERING CORPORATION 55.95 0.00 0 0
3097 PURBA BARDHAMAN Burdwan-I Central Mechanical BARASAT PIPED WATER SUPPLY SCHEME , SM/13906 New New service connection charges for Barasat PWSS TW-2 BILL/02204/2023-2024 BP-2023-24-394 17/01/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 5.63 0.00 0 0
3098 PURBA BARDHAMAN Burdwan-I Central Mechanical BARASAT PIPED WATER SUPPLY SCHEME , SM/13906 New New service connection charges for Barasat PWSS TW-1 BILL/02203/2023-2024 BP-2023-24-393 17/01/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 4.59 0.00 0 0
3099 PURBA BARDHAMAN Burdwan-I Burdwan Division BARASAT PIPED WATER SUPPLY SCHEME , SM/13906 New Different works related (sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of different capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site) to BARASAT, JAGADABAD & KHAIDYA Piped Water Supply Scheme under BURDWAN-I Block, District:- Purba Bardhaman [NEW SCHEME] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. J.E. 1 BURDWAN ORD/000465/2023-2024 3460/BWD 08/08/2023 783 CONCORD EMC ENCLAVE LLP 1,526.24 199.42 13.07 5
3100 PURBA BARDHAMAN Memari-II Burdwan Division BISHNUPUR PIPED WATER SUPPLY SCHEME , SM/18608 New Material Requisition To Resource Division RTOR000264/2023-2024 2197/BWD 12/05/2023 0 Resource Division 4.44 0.00 0 0
3101 PURBA BARDHAMAN Memari-II Burdwan Division BISHNUPUR PIPED WATER SUPPLY SCHEME , SM/18608 New Material Requisition To Resource Division RTOR000429/2023-2024 3857/BWD 01/09/2023 0 Resource Division 4.47 0.00 0 0
3102 PURBA BARDHAMAN Memari-II Burdwan Division BISHNUPUR PIPED WATER SUPPLY SCHEME , SM/18608 New Material Requisition To Resource Division RTOR000570/2023-2024 4942/BWD 10/11/2023 0 Resource Division 41.11 0.00 0 0
3103 PURBA BARDHAMAN Memari-II Central Mechanical BISHNUPUR PIPED WATER SUPPLY SCHEME , SM/18608 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at NOAHATI & others water supply scheme under Memari-II Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. ASSISTANT ENGINEER Junior Engineer ORD/000102/2024-2025 2395/CMD 02/08/2024 90 S.G. TECHNICAL SERVICES 36.99 0.00 0 0
3104 PURBA BARDHAMAN Memari-II Burdwan Division BISHNUPUR PIPED WATER SUPPLY SCHEME , SM/18608 New Continuation Work Order for supply of inspection Vehicle for inspection of different JJM related(schemes)works as and when required including supply of driver & fuel(minimum 8 hours duty per day) and all taxes etc. for Burdwan Sub-Division under Burdwan Division,PHE Dte consider 96.00 Km. run per day (Period from 01-05-2024 to 31-07-2024) JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000108/2024-2025 807/BSD 29/04/2024 66 PARVIN BEGAM 0.85 0.28 32.94 100
3105 PURBA BARDHAMAN Memari-II Burdwan Division BISHNUPUR PIPED WATER SUPPLY SCHEME , SM/18608 New Material Requisition To Resource Division RTOR000008/2024-2025 4117/BWD 25/11/2024 0 Resource Division 18.97 0.00 0 0
3106 PURBA BARDHAMAN Memari-II Central Mechanical BISHNUPUR PIPED WATER SUPPLY SCHEME , SM/18608 New New electric connection for Bishnupur PWSS, PH-3. BILL/01878/2023-2024 BP-2023-24-362 11/01/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 4.87 0.00 0 0
3107 PURBA BARDHAMAN Memari-II Central Mechanical BISHNUPUR PIPED WATER SUPPLY SCHEME , SM/18608 New New service connection charges for Bishnupur PWSS TW-2 BILL/02211/2023-2024 BP-2023-24-404 17/01/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 0.36 0.00 0 0
3108 PURBA BARDHAMAN Memari-II Central Mechanical BISHNUPUR PIPED WATER SUPPLY SCHEME , SM/18608 New New electric connection for Bishnupur PWSS, PH-1. BILL/01877/2023-2024 BP-2023-24-361 11/01/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 15.08 0.00 0 0
3109 PURBA BARDHAMAN Memari-II Burdwan Division BISHNUPUR PIPED WATER SUPPLY SCHEME , SM/18608 New BISHNUPUR Piped Water Supply Scheme with sinking of Tube-well, LDS, Rising Main, FHTC, Construction of 500 cum capacity RCC OHR with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drain and internal pathway at different TW site under Memari-II Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000451/2023-2024 3426/BWD 07/08/2023 967 NATIONAL CONSTRUCTION 870.64 726.91 83.49 70
3110 PURBA BARDHAMAN Memari-II Burdwan Division BISHNUPUR PIPED WATER SUPPLY SCHEME , SM/18608 New Field level data validation of FHTC executed by Agencies on the basis of pictorial data with the objective of controlling multiple entry,improving data quality in terms of absolute household by verification through electric connection or any other unique documents and making error free database of BISHNUPUR Pipe Water Supply Scheme in Memari-II Block within Burdwan Sub-Division under Burdwan Division,PHE Dte. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000887/2024-2025 2670/BSD 04/12/2024 30 TECHVISION 1.52 0.00 0 100
3111 PURBA BARDHAMAN Memari-II Burdwan Division BISHNUPUR PIPED WATER SUPPLY SCHEME , SM/18608 New Different Types of work involved in connection with different New Schemes (05 Nos.) Piped Water Supply Scheme under Memari II Block within Burdwan Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000003/2025-2026 1116/BWD 03/04/2025 120 SOFIQUL ISLAM 176.89 0.00 0 0
3112 PURBA BARDHAMAN Katwa-I Burdwan Division KARAJGRAM PIPED WATER SUPPLY SCHEME , SM/18483 New Material Requisition To Resource Division RTOR000313/2023-2024 2197/BWD 12/05/2023 0 Resource Division 13.39 0.00 0 0
3113 PURBA BARDHAMAN Katwa-I Burdwan Division KARAJGRAM PIPED WATER SUPPLY SCHEME , SM/18483 New Material Requisition To Resource Division RTOR000505/2023-2024 4029/BWD 08/09/2023 0 Resource Division 72.54 0.00 0 0
3114 PURBA BARDHAMAN Katwa-I Central Mechanical KARAJGRAM PIPED WATER SUPPLY SCHEME , SM/18483 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Jajigram & others water supply scheme under Katwa-I Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman Driller In-Charge Junior Engineer ORD/000069/2024-2025 2399/CMD 02/08/2024 90 SUBRATA BHADRA 55.16 0.00 0 0
3115 PURBA BARDHAMAN Katwa-I Central Mechanical KARAJGRAM PIPED WATER SUPPLY SCHEME , SM/18483 New New service connection for Karajgram PWSS PH-1. BILL/02287/2023-2024 BP-2023-24-417 19/01/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 11.35 0.00 0 0
3116 PURBA BARDHAMAN Katwa-I Central Mechanical KARAJGRAM PIPED WATER SUPPLY SCHEME , SM/18483 New Quotation for new service connection for Kharajgram PWSS TW-3 BILL/00341/2024-2025 BP-2024-25-164 01/07/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 4.61 0.00 0 0
3117 PURBA BARDHAMAN Katwa-I Central Mechanical KARAJGRAM PIPED WATER SUPPLY SCHEME , SM/18483 New New service connection charges for Karajgram PWSS TW-2 BILL/01098/2024-2025 BP-2024-25-405 25/11/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 6.19 0.00 0 0
3118 PURBA BARDHAMAN Katwa-I Burdwan Division KARAJGRAM PIPED WATER SUPPLY SCHEME , SM/18483 New KARAJGRAM Piped Water Supply Scheme with sinking of Tube-well, LDS,Rising Main, FHTC, Construction of 400 cum capacity RCC OHR with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drain and internal pathway at different TW site under Katwa-I Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer JUNIOR ENGINEER KATWA SUB-DIVISION PHE DTE,Junior Engineer, R.W.S., Katwa-I Dev. Block ORD/000428/2023-2024 3326/BWD 02/08/2023 883 MANASH GHOSH 533.47 169.36 31.75 60
3119 PURBA BARDHAMAN Katwa-I Central Mechanical KARAJGRAM PIPED WATER SUPPLY SCHEME , SM/18483 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1, 2 & 3 at KARAJGRAM Water Supply Scheme [ Block-KATWA-1 ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. Driller In-Charge Junior Engineer ORD/000872/2023-2024 4135/CMD 29/08/2023 610 SOUNAK ENTERPRISE 45.53 0.00 0 66
3120 PURBA BARDHAMAN Katwa-I Burdwan Division KHAJURDIHI PIPE WATER SUPPLY SCHEME , SM/18484 New Material Requisition To Resource Division RTOR000377/2023-2024 2197/BWD 12/05/2023 0 Resource Division 16.74 0.00 0 0
3121 PURBA BARDHAMAN Katwa-I Burdwan Division KHAJURDIHI PIPE WATER SUPPLY SCHEME , SM/18484 New Material Requisition To Resource Division RTOR000404/2023-2024 3828/BWD 01/09/2023 0 Resource Division 96.08 0.00 0 0
3122 PURBA BARDHAMAN Katwa-I Central Mechanical KHAJURDIHI PIPE WATER SUPPLY SCHEME , SM/18484 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1, 2 & 3 at KHAJURDIHI Water Supply Scheme [ Block- KATWA-1 ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. Driller In-Charge Junior Engineer ORD/000879/2023-2024 4142/CMD 29/08/2023 30 S.P. CONSTRUCTION 44.39 11.76 26.49 45
3123 PURBA BARDHAMAN Katwa-I Central Mechanical KHAJURDIHI PIPE WATER SUPPLY SCHEME , SM/18484 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Jajigram & others water supply scheme under Katwa-I Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman Driller In-Charge Junior Engineer ORD/000069/2024-2025 2399/CMD 02/08/2024 90 SUBRATA BHADRA 55.16 0.00 0 0
3124 PURBA BARDHAMAN Katwa-I Central Mechanical KHAJURDIHI PIPE WATER SUPPLY SCHEME , SM/18484 New New Service Connection for KHAJURDIHI PWSS PH-1. BILL/02284/2023-2024 BP-2023-24-418 19/01/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 2.80 0.00 0 0
3125 PURBA BARDHAMAN Katwa-I Central Mechanical KHAJURDIHI PIPE WATER SUPPLY SCHEME , SM/18484 New New service connection for Khajurdhi, PWSS PH-2. BILL/02286/2023-2024 BP-2023-24-419 19/01/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 2.81 0.00 0 0
3126 PURBA BARDHAMAN Katwa-I Central Mechanical KHAJURDIHI PIPE WATER SUPPLY SCHEME , SM/18484 New Addl. quotation for Khajurdihi PWSS TW-2 BILL/00830/2024-2025 BP-2024-25-326 03/10/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 0.99 0.00 0 0
3127 PURBA BARDHAMAN Katwa-I Burdwan Division KHAJURDIHI PIPE WATER SUPPLY SCHEME , SM/18484 New KHAJURDIHI Piped Water Supply Scheme with sinking of Tube-well, LDS, Rising Main, FHTC, Construction of 400 cum capacity RCC OHR with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drain and internal pathway at different TW site under Katwa-I Block, District:- Purba-Bardhaman [NEW SCHEME]_2ND CALL Assistant Engineer Junior Engineer, R.W.S., Katwa-I Dev. Block ORD/000497/2023-2024 3527/BWD 10/08/2023 792 MONDAL ENTERPRISE 570.77 237.19 41.56 75
3128 PURBA BARDHAMAN Katwa-I Burdwan Division KHAJURDIHI PIPE WATER SUPPLY SCHEME , SM/18484 New Different work for Khajurdihi PWSS Khajurdihi and Bera mouza with boundary wall, land development, plinth protection for pump house & OHR under KHAJURDIHI PWSS, at Katwa -I Block under Katwa Sub Division under Burdwan Division PHE Dte. Assistant Engineer ORD/001190/2024-2025 610/BWD 11/02/2025 120 MONDAL ENTERPRISE 196.33 0.00 0 0
3129 PURBA BARDHAMAN Katwa-II Burdwan Division MEJHIARI PIPED WATER SUPPLY SCHEME , SM/18456 New Material Requisition To Resource Division RTOR000342/2023-2024 2197/BWD 12/05/2023 0 Resource Division 10.86 0.00 0 0
3130 PURBA BARDHAMAN Katwa-II Burdwan Division MEJHIARI PIPED WATER SUPPLY SCHEME , SM/18456 New Material Requisition To Resource Division RTOR000410/2023-2024 3870/BWD 01/09/2023 0 Resource Division 6.49 0.00 0 0
3131 PURBA BARDHAMAN Katwa-II Burdwan Division MEJHIARI PIPED WATER SUPPLY SCHEME , SM/18456 New Material Requisition To Resource Division RTOR000641/2023-2024 5107/BWD 23/11/2023 0 Resource Division 20.32 0.00 0 0
3132 PURBA BARDHAMAN Katwa-II Central Mechanical MEJHIARI PIPED WATER SUPPLY SCHEME , SM/18456 New New service connection charges for Mejhiari PWSS TW-1 BILL/01541/2023-2024 BP-2023-24-211 01/11/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 8.05 0.00 0 0
3133 PURBA BARDHAMAN Katwa-II Central Mechanical MEJHIARI PIPED WATER SUPPLY SCHEME , SM/18456 New New service connection charges for Mejhiari PWSS TW-2 BILL/01538/2023-2024 BP-2023-24-208 30/10/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 5.87 0.00 0 0
3134 PURBA BARDHAMAN Katwa-II Central Mechanical MEJHIARI PIPED WATER SUPPLY SCHEME , SM/18456 New Supply & Delivery of Submersible Pumping Machinery, suspension clamp and tube well cover etc. for Tube well No.-2 at MEJHIARI Water Supply Scheme [ Block- KATWA-2] under CMD, PHE Dte.,Dist.- Purba-Bardhaman. Driller In-Charge ORD/001624/2023-2024 352/DIC/BMSD(D) 22/12/2023 7 SUBRATA BHADRA 0.89 0.00 0 0
3135 PURBA BARDHAMAN Katwa-II Central Mechanical MEJHIARI PIPED WATER SUPPLY SCHEME , SM/18456 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Mulgram & others water supply scheme under Katwa-II Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. ASSISTANT ENGINEER Junior Engineer ORD/000070/2024-2025 2409/CMD 02/08/2024 90 DUTTA ENTERPRISE 50.18 0.00 0 0
3136 PURBA BARDHAMAN Katwa-II Central Mechanical MEJHIARI PIPED WATER SUPPLY SCHEME , SM/18456 New Supply and installation of Electro-Magnetic flow meter at AURIA, KARUI & others water supply scheme under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. Driller In-Charge JUNIOR ENGINEER ORD/000602/2024-2025 3106/CMD 11/12/2024 60 S.K. ELECTRICALS 13.60 0.00 0 0
3137 PURBA BARDHAMAN Katwa-II Central Mechanical MEJHIARI PIPED WATER SUPPLY SCHEME , SM/18456 New Supply & Delivery of Submersible cable and column pipes for Tube Well No No:-2 at MEJHIARI water supply scheme[ Block - KATWA -2] under CMD, PHE Dte,. Dist.- Purba-Bardhaman. Driller In-Charge Junior Engineer ORD/001630/2023-2024 42/DIC/BMSD(D) 15/01/2024 7 SUBRATA BHADRA 0.82 0.82 100 100
3138 PURBA BARDHAMAN Katwa-II Central Mechanical MEJHIARI PIPED WATER SUPPLY SCHEME , SM/18456 New Supply & delivery of valves, starter and Installation of Submersible Pumping Machinery for Tube well No. - 2 at MEJHIARI Water Supply Scheme [ Block- KATWA-2] under CMD, PHE Dte., Dist.· Purba Bardhaman. Driller In-Charge Junior Engineer ORD/001632/2023-2024 46/DIC/BMSD(D) 19/01/2024 15 SUBRATA BHADRA 0.68 0.59 86.76 100
3139 PURBA BARDHAMAN Katwa-II Central Mechanical MEJHIARI PIPED WATER SUPPLY SCHEME , SM/18456 New Supply & Delivery of 3 Phase actuator operated wafer type butterfly valve for Tube well No.- 2 at MEJHIARI Water Supply Scheme [Block- KATWA-2] under CMD, PHE Dte., Dist.- Purba-Bardhaman. Driller In-Charge Junior Engineer ORD/001626/2023-2024 24/DIC/BMSD(D) 05/01/2024 7 SUBRATA BHADRA 0.98 0.98 100 99
3140 PURBA BARDHAMAN Katwa-II Central Mechanical MEJHIARI PIPED WATER SUPPLY SCHEME , SM/18456 New Supply & Delivery of Submersible Pumping Machinery, suspension clamp and tube well cover etc. for Tube well No.-2 at MEJHIARI Water Supply Scheme [ Block- KATWA-2] under CMD, PHE Dte.,Dist.- Purba-Bardhaman. Driller In-Charge Junior Engineer ORD/001690/2023-2024 351/DIC/BMSD(D) 22/12/2023 7 SUBRATA BHADRA 0.89 0.89 100 100
3141 PURBA BARDHAMAN Katwa-II Burdwan Division MEJHIARI PIPED WATER SUPPLY SCHEME , SM/18456 New Different works related (sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of different capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site) to MEJHIARY & KARUI Piped Water Supply Scheme under Katwa ¿ II Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer JUNIOR ENGINEER KATWA SUB-DIVISION PHE DTE ORD/000421/2023-2024 3291/BWD 31/07/2023 701 M/S S. CHOUDHURY 1,294.79 559.78 43.23 100
3142 PURBA BARDHAMAN Katwa-II Burdwan Division MEJHIARI PIPED WATER SUPPLY SCHEME , SM/18456 New Different types of works involve in connection with implementation of Aug. Mongalkote, Palishgram, Purba Nowapara, Sitahati, Singhi, Mejhiary & Karui Piped Water Supply Scheme within Katwa Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer ORD/001191/2024-2025 873/BWD 06/03/2025 180 M/S S. CHOUDHURY 588.22 0.00 0 0
3143 PURBA BARDHAMAN Katwa-II Burdwan Division MEJHIARI PIPED WATER SUPPLY SCHEME , SM/18456 New Construction of Toilet (1.8 m x 1.8 m) with sanitary arrangement under MAJHIARI PWSS(SM/18456) 2nd Tube Well Site under Katwa Sub-Division under Burdwan Division PHE Dte. (Sl No-05) Assistant Engineer JUNIOR ENGINEER KATWA SUB-DIVISION PHE DTE ORD/001267/2024-2025 346/KTS 05/03/2025 30 GHOSH CONSTRUCTION 2.45 0.00 0 100
3144 PURBA BARDHAMAN Memari-I Burdwan Division NUDIPUR PIPED WATER SUPPLY SCHEME , SM/18834 New Material Requisition To Resource Division RTOR000358/2023-2024 2197/BWD 12/05/2023 0 Resource Division 19.77 0.00 0 0
3145 PURBA BARDHAMAN Memari-I Burdwan Division NUDIPUR PIPED WATER SUPPLY SCHEME , SM/18834 New Material Requisition To Resource Division RTOR000533/2023-2024 4295/BWD 29/09/2023 0 Resource Division 3.92 0.00 0 0
3146 PURBA BARDHAMAN Memari-I Burdwan Division NUDIPUR PIPED WATER SUPPLY SCHEME , SM/18834 New Material Requisition To Resource Division RTOR000684/2023-2024 5057/BWD 23/11/2023 0 Resource Division 20.46 0.00 0 0
3147 PURBA BARDHAMAN Memari-I Central Mechanical NUDIPUR PIPED WATER SUPPLY SCHEME , SM/18834 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at SAHAPUR & others water supply scheme under Memari-I Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. ASSISTANT ENGINEER Junior Engineer ORD/000100/2024-2025 2392/CMD 02/08/2024 90 MITRA ENTERPRISE 47.62 0.00 0 0
3148 PURBA BARDHAMAN Memari-I Central Mechanical NUDIPUR PIPED WATER SUPPLY SCHEME , SM/18834 New New service connection at Nudipur PWSS PH-2 BILL/02354/2023-2024 BP-2023-24-468 31/01/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 4.43 0.00 0 0
3149 PURBA BARDHAMAN Memari-I Central Mechanical NUDIPUR PIPED WATER SUPPLY SCHEME , SM/18834 New New service connection at Nudipur PWSS PH-1 BILL/02356/2023-2024 BP-2023-24-467 31/01/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 13.67 0.00 0 0
3150 PURBA BARDHAMAN Memari-I Burdwan Division NUDIPUR PIPED WATER SUPPLY SCHEME , SM/18834 New Different works related (sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of different capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site) to CHANCHAL & NUDIPUR Piped Water Supply Scheme under Memari I Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000692/2023-2024 4389/BWD 05/10/2023 730 MANASH GHOSH 1,343.97 12.97 0.97 45
3151 PURBA BARDHAMAN Memari-I Burdwan Division NUDIPUR PIPED WATER SUPPLY SCHEME , SM/18834 New Continuation Work Order for supply of inspection Vehicle for inspection of different JJM related (schemes)works as and when required including supply of driver & fuel(minimum 8 hours duty per day) and all taxes etc. for Burdwan Sub-Division under Burdwan Division,PHE Dte consider 96.00 Km. run per day (Period from 01-08-2024 to 31-10-2024) JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000557/2024-2025 1500/BSD 30/07/2024 66 PARVIN BEGAM 0.85 0.28 32.94 100
3152 PURBA BARDHAMAN Memari-I Burdwan Division NUDIPUR PIPED WATER SUPPLY SCHEME , SM/18834 New Continuation work order for "Supply of one No. Diesel Driven Ambassador Car on hire basis for the office of the Assistant Engineer, Burdwan Sub-Division, PHE Dte. (Period from 01-12-2024 to 28-02-2025 JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/001043/2024-2025 2636/BSD 29/11/2024 90 SK. ASFIA 1.20 0.00 0 60
3153 PURBA BARDHAMAN Memari-I Burdwan Division NUDIPUR PIPED WATER SUPPLY SCHEME , SM/18834 New Restoration of concrete road by Cement concrete (mix 1:1.5:3), Providing balance FHTC, parallel pipeline, drainage system, boundary wall, Bridge, land development, Sluice valve chamber for smooth water supply of FHTC work for NUDIPUR PWSS and its adjoining mouzas within MEMARI-I BLOCK under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/001115/2024-2025 477/BWD 24/01/2025 250 SHIVAM UN-EMPLOYED ENGINEERS CO-OPERATIVE SOCIETY LTD. 64.73 0.00 0 25
3154 PURBA BARDHAMAN Memari-I Burdwan Division NUDIPUR PIPED WATER SUPPLY SCHEME , SM/18834 New Continuation Work Order for Supply of one No.Diesel Driven Ambassador Car No. WB:41H-4009 on hire basis for the office of the Assistant Engineer,Burdwan Sub-Division,PHE Dte (Period from 01-06-2025 to 31.08.2025) JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000180/2025-2026 1260/BSD 30/05/2025 92 SK. ASFIA 1.20 0.00 0 60
3155 PURBA BARDHAMAN Memari-I Burdwan Division NUDIPUR PIPED WATER SUPPLY SCHEME , SM/18834 New Continuation Work Order for Supply of one No.Diesel Driven Ambassador Car on hire basis for the office of the Assistant Engineer, Burdwan Sub-Division,PHE Dte(Period from 01-09-2025 to 30.11.2025) JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000693/2025-2026 2473/BSD 29/08/2025 91 SK. ASFIA 1.20 0.00 0 0
3156 PURBA BARDHAMAN Memari-I Burdwan Division NUDIPUR PIPED WATER SUPPLY SCHEME , SM/18834 New Continuation Work Order for supply of inspection Vehicle for inspection of different JJM related (schemes) works as and when required including supply of driver & fuel(minimum 8 hours duty per day) and all taxes etc. for Burdwan Sub-Division under Burdwan Division,PHE Dte consider 96.00 Km. run per day (Period from 01-08-2025 to 31-10-2025) JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000703/2025-2026 2019/BSD 31/07/2025 66 PARVIN BEGAM 0.85 0.00 0 0
3157 PURBA BARDHAMAN Raina-II Burdwan Division Bara Bainan Piped Water Supply Scheme , SM/18406 New Material Requisition To Resource Division RTOR000231/2023-2024 2155/BWD 10/05/2023 0 Resource Division 10.15 0.00 0 0
3158 PURBA BARDHAMAN Raina-II Burdwan Division Bara Bainan Piped Water Supply Scheme , SM/18406 New Material Requisition To Resource Division RTOR000232/2023-2024 2197/BWD 12/05/2023 0 Resource Division 10.15 0.00 0 0
3159 PURBA BARDHAMAN Raina-II Burdwan Division Bara Bainan Piped Water Supply Scheme , SM/18406 New Material Requisition To Resource Division RTOR000424/2023-2024 3838/BWD 01/09/2023 0 Resource Division 8.01 0.00 0 0
3160 PURBA BARDHAMAN Raina-II Burdwan Division Bara Bainan Piped Water Supply Scheme , SM/18406 New Continuation Work Order supply of inspection Vehicle for inspection of different JJM related(schemes)works as and when required including supply of driver & fuel(minimum 8 hours duty per day) and all taxes etc. for Burdwan Sub-Division under Burdwan Division,PHE Dte consider 96.00 Km. run per day (Period from 01-11-2023 to 31-01-2024) ORD/000985/2023-2024 2561/BSD 30/10/2023 66 MD HASIN 0.85 0.00 0 0
3161 PURBA BARDHAMAN Raina-II Burdwan Division Bara Bainan Piped Water Supply Scheme , SM/18406 New Supply of inspection Vehicle for inspection of different JJM related(schemes)works as and when required including supply of driver & fuel(minimum 8 hours duty per day) and all taxes etc. for Burdwan Sub-Division under Burdwan Division,PHE Dte consider 96.00 Km. run per day (Period from 01-02-2024 to 30-04-2024) Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/001181/2023-2024 188/BSD 31/01/2024 66 PARVIN BEGAM 0.85 0.28 32.94 97
3162 PURBA BARDHAMAN Raina-II Central Mechanical Bara Bainan Piped Water Supply Scheme , SM/18406 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Satinandi,Sanko & others water supply scheme under Galsi-1 Block ; Serpur, Uchalan & others water supply scheme under Raina-2 Block and maro, loapur & others water supply scheme under Galsi-2 block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000397/2024-2025 2751/CMD 24/09/2024 90 ORIENTAL ENGINEERING CO. 88.42 0.00 0 0
3163 PURBA BARDHAMAN Raina-II Central Mechanical Bara Bainan Piped Water Supply Scheme , SM/18406 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at Barabainan Water Supply Scheme [ Block- Raina-2 ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000725/2023-2024 4036/CMD 29/08/2023 30 S.K. ENTERPRISE 28.98 23.16 79.92 96
3164 PURBA BARDHAMAN Raina-II Burdwan Division Bara Bainan Piped Water Supply Scheme , SM/18406 New Material Requisition To Resource Division RTOR000788/2023-2024 320/BWD 24/01/2024 0 Resource Division 21.17 0.00 0 0
3165 PURBA BARDHAMAN Raina-II Central Mechanical Bara Bainan Piped Water Supply Scheme , SM/18406 New Quotation for new electric service connection at Bara Bainan PH NO.-1 BILL/01742/2023-2024 BP-2023-24-262 07/12/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.49 0.00 0 0
3166 PURBA BARDHAMAN Raina-II Central Mechanical Bara Bainan Piped Water Supply Scheme , SM/18406 New New Service connection at BARA BAINAN PWSS TW-1. BILL/02361/2023-2024 BP-2023-24-485 31/01/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 0.68 0.00 0 0
3167 PURBA BARDHAMAN Raina-II Central Mechanical Bara Bainan Piped Water Supply Scheme , SM/18406 New New service connection charges for Bara Bainan PWSS TW-2 BILL/02212/2023-2024 BP-2023-24-387 17/01/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 4.11 0.00 0 0
3168 PURBA BARDHAMAN Raina-II Burdwan Division Bara Bainan Piped Water Supply Scheme , SM/18406 New Different works related (sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of different capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site) to BARABAINAN & CHAUDANGA Piped Water Supply Scheme under Raina ¿ II Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000412/2023-2024 3257/BWD 27/07/2023 807 SK ALIM 1,144.16 406.43 35.52 90
3169 PURBA BARDHAMAN Burdwan Division Retrofitting wroks for Providing Functional Household Tap Connection (FHTC) within the command area of of Amarun Piped Water Supply Scheme, Block Bhatar, District Purba Bardhaman , SM/08105 Retrofitting Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Arrah village and arrah habitation of AMARUN piped water supply scheme within Durgapur (bardhaman North) Sub-Division under Burdwan Division, PHE Dte. [Phase-I](Tr No.-542/BWD/2020-21) Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000252/2020-2021 3346/BWD 18/09/2020 30 M.R. CONSTRUCTION CO. 4.86 9.72 200 1
3170 PURBA BARDHAMAN Burdwan Division Retrofitting wroks for Providing Functional Household Tap Connection (FHTC) within the command area of of Amarun Piped Water Supply Scheme, Block Bhatar, District Purba Bardhaman , SM/08105 Retrofitting Continuation work order for Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Amarun village and Amarun habitation of Amarun piped water supply scheme within Durgapur (Bardhaman North) Sub-Division under Burdwan Division, PHE Dte. [Phase-I][Tr No.-508/BWD/20-21] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000383/2020-2021 4793/BWD 03/12/2020 30 BHARAT CONSTRUCTION 4.87 9.60 197.13 1
3171 PURBA BARDHAMAN Burdwan Division Retrofitting wroks for Providing Functional Household Tap Connection (FHTC) within the command area of of Amarun Piped Water Supply Scheme, Block Bhatar, District Purba Bardhaman , SM/08105 Retrofitting Continuation work order for Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Arra village and Arrah habitation of Amarun piped water supply scheme within Durgapur (Bardhaman North) Sub-Division under Burdwan Division, PHE Dte. [Phase-I] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000624/2020-2021 4989/BWD 10/12/2020 30 M.R. CONSTRUCTION CO. 4.86 9.72 200 1
3172 PURBA BARDHAMAN Burdwan Division Retrofitting wroks for Providing Functional Household Tap Connection (FHTC) within the command area of of Amarun Piped Water Supply Scheme, Block Bhatar, District Purba Bardhaman , SM/08105 Retrofitting Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Amarun village and Amarun habitation of Amarun piped water supply scheme within Durgapur (Bardhaman North) Sub-Division under Burdwan Division, PHE Dte. [Phase-I](Tr No.-805/BWD/2020-21) Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000382/2020-2021 3345/BWD 18/09/2020 30 BHARAT CONSTRUCTION 4.87 9.73 199.79 1
3173 PURBA BARDHAMAN Burdwan Division Retrofitting wroks for Providing Functional Household Tap Connection (FHTC) within the command area of of Amarun Piped Water Supply Scheme, Block Bhatar, District Purba Bardhaman , SM/08105 Retrofitting Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of AMARUN (Z-II) Piped Water Supply Scheme at Hanrgram (4 Nos. Habs.), Erachya (6 Nos. Habs.) Village (Mouza), Bhatar Block under Burdwan Division, PHE Dte. Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000363/2021-2022 7157/BWD 24/12/2021 60 S.S. CONSTRUCTION 76.46 38.46 50.3 1
3174 PURBA BARDHAMAN Burdwan Division Retrofitting wroks for Providing Functional Household Tap Connection (FHTC) within the command area of of Amarun Piped Water Supply Scheme, Block Bhatar, District Purba Bardhaman , SM/08105 Retrofitting Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of AMARUN (Z-I & II) Piped Water Supply Scheme at Arra, Amarun, Nawada, Sunur (Part), Eora, Palsona & Bijyapur Village (Mouza), Bhatar Block under Burdwan Division, PHE Dte. Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000317/2021-2022 7086/BWD 22/12/2021 60 NATIONAL CONSTRUCTION 85.05 80.10 94.18 1
3175 PURBA BARDHAMAN Burdwan Division Retrofitting wroks for Providing Functional Household Tap Connection (FHTC) within the command area of of Amarun Piped Water Supply Scheme, Block Bhatar, District Purba Bardhaman , SM/08105 Retrofitting Relaying for shifting of distribution line at Eora village for construction of Box culvert by PWD Department within Amarun and its adjoining mouzas W/S Scheme (Zone-I) under Durgapur Sub-Division, Burdwan Division, P.H.E. Dte. [Gr.-B] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000313/2022-2023 525/DSD 22/08/2022 15 BHARAT CONSTRUCTION 0.73 0.00 0 0
3176 PURBA BARDHAMAN Burdwan Division Retrofitting wroks for Providing Functional Household Tap Connection (FHTC) within the command area of of Amarun Piped Water Supply Scheme, Block Bhatar, District Purba Bardhaman , SM/08105 Retrofitting Construction of Temporary Approach road to HW site for Augmentation of Amarun (Zone-II ) Piped water supply Scheme , P.H.E Dte. Block:-Bhatar, Dist: Purba Bardhaman. [Gr.-F] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000136/2022-2023 347/DSD 30/06/2022 21 M/S S. CHOUDHURY 1.04 1.04 100 100
3177 PURBA BARDHAMAN Burdwan Division Retrofitting wroks for Providing Functional Household Tap Connection (FHTC) within the command area of of Amarun Piped Water Supply Scheme, Block Bhatar, District Purba Bardhaman , SM/08105 Retrofitting Restoration of damaged pipeline of distribution main for construction of drain, concrete road etc at various point at Sunur, and Amarun village for providing FHTC within Amarun W/S Scheme (Zone-I &II) in Bhatar Block under Burdwan Division, P.H.E. Dte. [SL-17] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer2, Durgapur Sub-Division, PHE Dte. ORD/000859/2022-2023 716/DSD 30/12/2022 30 SAMANTA CONSTRUCTION 1.93 1.91 98.96 100
3178 PURBA BARDHAMAN Burdwan Division Retrofitting wroks for Providing Functional Household Tap Connection (FHTC) within the command area of of Amarun Piped Water Supply Scheme, Block Bhatar, District Purba Bardhaman , SM/08105 Retrofitting Extension of UPVC pipe line of LDS at Palsona Mouza for providing FHTC of Amarun and its adjoining mouzas W/S Scheme (Phase-II) under Durgapur Sub-Division, Burdwan Division, P.H.E. Dte. [SL-15] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer2, Durgapur Sub-Division, PHE Dte. ORD/000857/2022-2023 714/DSD 30/12/2022 30 SANDIPAN SENGUPTA 4.81 4.81 100 100
3179 PURBA BARDHAMAN Burdwan Division Retrofitting wroks for Providing Functional Household Tap Connection (FHTC) within the command area of of Amarun Piped Water Supply Scheme, Block Bhatar, District Purba Bardhaman , SM/08105 Retrofitting Extension of UPVC pipe line of LDS at Bijyapur Mouza for providing FHTC of Amarun and its adjoining mouzas W/S Scheme under Durgapur Sub-Division, Burdwan Division, P.H.E. Dte. [SL-16] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer2, Durgapur Sub-Division, PHE Dte. ORD/000858/2022-2023 715/DSD 30/12/2022 30 SAMANTA CONSTRUCTION 4.83 4.83 100 100
3180 PURBA BARDHAMAN Burdwan Division Retrofitting wroks for Providing Functional Household Tap Connection (FHTC) within the command area of of Amarun Piped Water Supply Scheme, Block Bhatar, District Purba Bardhaman , SM/08105 Retrofitting Extension of UPVC pipe line of LDS at Hanrgram Khaspara, Chhatipara and Daspara for providing FHTC of Amarun and its adjoining mouzas W/S Scheme (Zone-II) under Durgapur Sub-Division, Burdwan Division, P.H.E. Dte.[SL-29] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer2, Durgapur Sub-Division, PHE Dte. ORD/000846/2022-2023 708/DSD 31/12/2022 30 NANGTASWAR CO. OP. LABOUR CONT. AND CONSTRUCTION SOCIETY LTD. 4.61 0.00 0 100
3181 PURBA BARDHAMAN Burdwan Division Retrofitting wroks for Providing Functional Household Tap Connection (FHTC) within the command area of of Amarun Piped Water Supply Scheme, Block Bhatar, District Purba Bardhaman , SM/08105 Retrofitting Extension of UPVC pipe line of LDS at Nandanarayanpur and Paschimpara for providing FHTC of Amarun and its adjoining mouzas W/S Scheme (Zone-II) under Durgapur Sub-Division, Burdwan Division, P.H.E. Dte. [SL-27] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer2, Durgapur Sub-Division, PHE Dte. ORD/000869/2022-2023 725/DSD 30/12/2022 30 BABA ADHIRA CONSTRUCTION 4.83 4.83 100 100
3182 PURBA BARDHAMAN Burdwan Division Retrofitting wroks for Providing Functional Household Tap Connection (FHTC) within the command area of of Amarun Piped Water Supply Scheme, Block Bhatar, District Purba Bardhaman , SM/08105 Retrofitting Sinking of 250 X 150 mm dia Tubewell and Modification to distribution network by making a loop and extension with uPVC pipe to augment the water supply to FHTC at Sunur and Arra village of AMARUN and its adjoining mouzas W/S Scheme (Zone-I) under Durgapur Sub-Division, Burdwan Division, P.H.E. Dte. Assistant Engineer, Durgapur Sub Division, P.H.E. Dte JUNIOR ENGINEER DURGAPUR SUB-DIVISION PHE DTE ORD/001069/2023-2024 1016/BWD 07/03/2024 60 BAMDEB CONSTRUCTION & CO 34.03 34.01 99.94 80
3183 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of CHAK SANJADI Piped Water Supply Scheme at Jamalpur Block , SM/07857 Retrofitting Construction of Boundary wall at 2nd TW site for Chakshanjadi W/S Scheme with in Jamalpur block under Burdwan Div. PHED.(Lenth-78.0mtr & Col.-28nos.) GROUP : F Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. Junior Engineer, R.W.S. Burdwan Sub Division, P.H.E. Dt ORD/000085/2022-2023 819/BSD 20/05/2022 45 SOUMYAVASH DAS 4.06 0.00 0 1
3184 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of CHAK SANJADI Piped Water Supply Scheme at Jamalpur Block , SM/07857 Retrofitting Supply of materials for different water supply scheme under Burdwan Division, PHE Dte. VCH/001237/2021-2022 1132/DW 26/02/2022 0 EXECUTIVE ENGINEER, RESOURCES DIVISION, P.H.E. DTE. 221.00 0.00 0 0
3185 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of CHAK SANJADI Piped Water Supply Scheme at Jamalpur Block , SM/07857 Retrofitting Extension of pipeline including providing FHTC for CHAKSHANJADI Piped Water Supply Scheme at Chalbalpur Habitation for Sajal Gram (As per Field Verification Report duly signed by Pradhan for Har Ghar Jal Certification) within Jamalpur Block under Burdwan Divn.PHE Dte.Gr.G. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. Junior Engineer, R.W.S. Burdwan Sub Division, P.H.E. Dt ORD/000340/2022-2023 1361/BSD 03/08/2022 5 M/S ANAND CONSTRUCTION 0.95 0.00 0 1
3186 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of CHAK SANJADI Piped Water Supply Scheme at Jamalpur Block , SM/07857 Retrofitting Extension of pipeline providing FHTC for CHAKSHANJADI Piped Water Supply Scheme at Chalbalpur Habitation for Sajal Gram(As per Field Verification Report duly signed by Pradhan for Har Ghar Jal Certification)within Jamalpur Block under Burdwan Divn.PHE Dte.Gr.H. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. Junior Engineer, R.W.S. Burdwan Sub Division, P.H.E. Dt ORD/000341/2022-2023 1364/BSD 04/08/2022 5 M/S ANAND CONSTRUCTION 0.96 0.00 0 1
3187 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of CHAK SANJADI Piped Water Supply Scheme at Jamalpur Block , SM/07857 Retrofitting Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of Chaksanjadi Piped Water Supply Scheme at Jamdaha, Haibatpur, Chalbalpur & Kanakpur Village (Mouza), Jamalpur Block under Burdwan Division, PHE Dte. (Agreement no. 791/BWD of 2020-2021) Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. Junior Engineer, R.W.S. Burdwan Sub Division, P.H.E. Dt ORD/000432/2020-2021 1795/BWD 26/02/2021 45 M/S GUPTA ENTERPRISE 40.21 39.33 97.81 1
3188 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of CHAK SANJADI Piped Water Supply Scheme at Jamalpur Block , SM/07857 Retrofitting Providing leftout water tap connection in different villages for 100% coverage to make it Sajal Gram from existing distribution system within scheme jurisdiction of different Piped Water Supply Schemes within Jamalpur Block (Paratal-II, Berugram, Abujhati & Chakdighi G.P.) under Burdwan Division, PHE. Dte. (Part-B). AE(HQs),Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JE/RWS/JAMALPUR ORD/000345/2021-2022 40/BWD 05/01/2022 30 PREMANANDA ROY BISWAS 22.68 0.00 0 1
3189 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of CHAK SANJADI Piped Water Supply Scheme at Jamalpur Block , SM/07857 Retrofitting Laying of interconnection of both the Pump No.1,2 & 3 and distribution main of 250 mm dia along with Byw-Pass arrangement from Over Head Reservoir for Chak Shanjadi piped water supply scheme within Jamalpur Block under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. Junior Engineer, R.W.S. Burdwan Sub Division, P.H.E. Dt ORD/000925/2020-2021 4970/BWD 10/12/2020 30 TIRUPATI ENTERPRISES 8.98 0.00 0 1
3190 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of CHAK SANJADI Piped Water Supply Scheme at Jamalpur Block , SM/07857 Retrofitting Continuation order for supply & delivery of different dia CIDF pipes, sluice valve & fittings for construction of RCC OHR (400 cum capacity) for Chakshanjadi w/s scheme under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. Junior Engineer, R.W.S. Burdwan Sub Division, P.H.E. Dt ORD/000693/2021-2022 387/BWD 20/01/2022 20 B.B.C. ENTERPRISE 15.17 0.00 0 1
3191 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of CHAK SANJADI Piped Water Supply Scheme at Jamalpur Block , SM/07857 Retrofitting Providing leftout water tap connection in different villages for 100% coverage to make it Sajal Gram from existing distribution system within scheme jurisdiction of different Piped Water Supply Schemes within Jamalpur Block (Jarogram, Ajhapur, Panchra & Jougram G.P.) under Burdwan Division, PHE. Dte. (Part-A)_2ND CALL. AE(HQs),Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JE/RWS/JAMALPUR ORD/000592/2021-2022 1454/BWD 11/03/2022 30 PREMANANDA ROY BISWAS 18.83 0.00 0 1
3192 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of CHAK SANJADI Piped Water Supply Scheme at Jamalpur Block , SM/07857 Retrofitting Construction of boundary wall at Head works site of CHAKSHANJADI Piped Water Supply Scheme in Jamalpur Block under Burdwan Division, PHE Dte. (Length - 123 Mtr., 46 Nos Column). Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. Junior Engineer, R.W.S. Burdwan Sub Division, P.H.E. Dt ORD/000098/2022-2023 2743/BWD 08/06/2022 30 MOYAZZEM CONSTRUCTION 8.12 0.00 0 1
3193 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of CHAK SANJADI Piped Water Supply Scheme at Jamalpur Block , SM/07857 Retrofitting Construction of Boundary wall at 3rd TW site for Chakshanjadi W/S Scheme with in Jamalpur block under Burdwan Div. PHED.(Lenth-48.0mtr & Col.-19nos.) GROUP : E Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. Junior Engineer, R.W.S. Burdwan Sub Division, P.H.E. Dt ORD/000084/2022-2023 818/BSD 20/05/2022 45 M/S PURBASHA 4.06 0.00 0 1
3194 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of CHAK SANJADI Piped Water Supply Scheme at Jamalpur Block , SM/07857 Retrofitting Material Requisition To Resource Division RTOR000124/2021-2022 1107/BWD 26/02/2022 0 Resource Division 44.82 0.00 0 0
3195 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of CHAK SANJADI Piped Water Supply Scheme at Jamalpur Block , SM/07857 Retrofitting Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of Chaksanjadi Piped Water Supply Scheme at Chaksanjadi & Shambhupur Village (Mouza), Jamalpur Block under Burdwan Division, PHE Dte. [Agreement No. 680/BWD OF 2020-2021] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. Junior Engineer, R.W.S. Burdwan Sub Division, P.H.E. Dt ORD/000313/2020-2021 1399/BWD 15/02/2021 45 B.B.C. ENTERPRISE 43.50 84.60 194.48 0
3196 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) under the command area of Panuhat Piped Water Supply Scheme , SM/07552 Retrofitting Extension of pipe line for FHTC work from the existing Distribution System within scheme jurisdiction at Panuhat village under Panuhat PWSS under Katwa Sub-Division under Burdwan Division PHE Dte. [Phase-2] (Sl No-2) Assistant Engineer ORD/000299/2021-2022 729/KTS 16/11/2021 7 HAMID SK 1.93 1.93 100 1
3197 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) under the command area of Panuhat Piped Water Supply Scheme , SM/07552 Retrofitting Extension of pipe line for FHTC work from the existing Distribution System within scheme jurisdiction at Panuhat village under Panuhat PWSS under Katwa Sub-Division under Burdwan Division PHE Dte. [Phase-1] (Sl No-1) Assistant Engineer ORD/000298/2021-2022 728/KTS 16/11/2021 7 HAMID SK 1.96 1.96 100 1
3198 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) under the command area of Panuhat Piped Water Supply Scheme , SM/07552 Retrofitting Supplying, laying and commissioning of Rising main at pump no. - 1 of Panuhat Piped Water Supply Scheme under Katwa Sub-Division under Burdwan Division, PHE Dte. [Sl No-06] Assistant Engineer ORD/000159/2022-2023 443/KTS 27/06/2022 30 HAMID SK 2.27 2.27 100 1
3199 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) under the command area of Panuhat Piped Water Supply Scheme , SM/07552 Retrofitting Sinking of 300 X 200mm dia Tube Well 200 mtr. Depth by D.R. Rig method using UPVC pipe (CM) and UPVC Medium Well Screen (RMS) for Augmentation of PANUHAT and its adjoining mouzas Piped Water Supply Scheme, Block Katwa I, Dist - Purba Bardhaman under Burdwan Division, PHE Dte. Assistant Engineer JUNIOR ENGINEER KATWA SUB-DIVISION PHE DTE ORD/000668/2022-2023 387/BWD 31/01/2023 30 SUBODH KUMAR MONDAL 11.70 8.35 71.37 100
3200 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) under the command area of Panuhat Piped Water Supply Scheme , SM/07552 Retrofitting Hire & fuel charges of vehicle (Car No.-WB-04G-6018) for the office of the Assistant Engineer, Katwa Sub-Division, PHE Dte. for the month of January'23. BILL/00468/2022-2023 1118/JJM 27/02/2023 0 M/S MUNMUN DEY 0.26 0.00 0 0
3201 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) under the command area of Panuhat Piped Water Supply Scheme , SM/07552 Retrofitting Hire & fuel charges of vehicle (Car No.-WB-04G-6018) for the office of the Assistant Engineer, Katwa Sub-Division, PHE Dte. for the month of November & December'22. BILL/00467/2022-2023 1048/JJM 07/02/2023 0 M/S MUNMUN DEY 0.59 0.00 0 0
3202 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) under the command area of Panuhat Piped Water Supply Scheme , SM/07552 Retrofitting Balance work of OHR at Head Work site, construction of HUME Pipe culvert , Road restoration work and boundary wall at 2nd TW site with Gate, land development at Head work site and 2nd TW site under KAITHAN, SUDPUR & PANUHAT Piped Water Supply Scheme under KATWA -I Block, under Katwa Sub-Division within Burdwan Division, PHE Dte. Assistant Engineer JUNIOR ENGINEER KATWA SUB-DIVISION PHE DTE ORD/000486/2024-2025 3141/BWD 20/08/2024 120 VISHAL CONSTRUCTION CO. 126.29 0.00 0 50
3203 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) under the command area of Panuhat Piped Water Supply Scheme , SM/07552 Retrofitting Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of PANUHAT Piped Water Supply Scheme at different villages, Katwa-I Block under Burdwan Division, PHE Dte. (Part-B).[Agreement No. 728/BWD OF 2020-2021.] AE(HQs) J.E. 2 BURDWAN ORD/000325/2020-2021 1689/BWD 24/02/2021 45 HAMID SK 35.28 35.04 99.32 0
3204 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) under the command area of Panuhat Piped Water Supply Scheme , SM/07552 Retrofitting Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of PANUHAT Piped Water Supply Scheme at different villages, Katwa-I Block under Burdwan Division, PHE Dte. (Part-A).[Agreement No. 727/BWD OF 2020-2021.] Assistant Engineer JUNIOR ENGINEER KATWA SUB-DIVISION PHE DTE ORD/000326/2020-2021 1688/BWD 24/02/2021 45 HAMID SK 35.66 37.99 106.53 0
3205 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) under the command area of Panuhat Piped Water Supply Scheme , SM/07552 Retrofitting Detail route survey, design of distribution network and preparation of estimate, drawing & DPR for providing FHTC in the scheme EKAIHAT, PANUHAT PWSS (Sl No-2) Assistant Engineer JUNIOR ENGINEER KATWA SUB-DIVISION PHE DTE ORD/000070/2023-2024 394/KTS 13/04/2023 30 SIRCON ENGINEERING SERVICES 2.48 1.24 50 100
3206 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of MANGOLKOTE and NATUNHAT Piped Water Supply Scheme at Mangolkote Block , SM/07859 Retrofitting Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of Mongalkot Piped Water Supply Scheme at Mongalkot (3 Nos Habitation) Village (Mouza), Mongalkot Block under Burdwan Division, PHE Dte. Assistant Engineer ORD/000087/2021-2022 3598/BWD 13/07/2021 60 S.S. CONSTRUCTION 115.84 115.03 99.3 1
3207 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of MANGOLKOTE and NATUNHAT Piped Water Supply Scheme at Mangolkote Block , SM/07859 Retrofitting Hire & fuel charges of vehicle (Car No.-WB-04G/6018) for the office of the Assistant Engineer, Katwa Sub-Division, PHE Dte. for the month of May & June'2022. VCH/000646/2022-2023 546/VEH/22-23 13/09/2022 0 M/S MUNMUN DEY 0.56 0.00 0 0
3208 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of MANGOLKOTE and NATUNHAT Piped Water Supply Scheme at Mangolkote Block , SM/07859 Retrofitting Supply of materials for different water supply scheme under Burdwan Division, PHE Dte. VCH/001237/2021-2022 1132/DW 26/02/2022 0 EXECUTIVE ENGINEER, RESOURCES DIVISION, P.H.E. DTE. 221.00 0.00 0 0
3209 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of MANGOLKOTE and NATUNHAT Piped Water Supply Scheme at Mangolkote Block , SM/07859 Retrofitting Extension and replacement of pipe line from the existing Distribution System within scheme jurisdiction at Mongalkote village under Mongalkote PWSS under Mongalkote Block within Katwa Sub-Division under Burdwan Division PHE Dte. [Sl No-02] Assistant Engineer ORD/000154/2022-2023 438/KTS 27/06/2022 30 NANGTASWAR CO. OP. LABOUR CONT. AND CONSTRUCTION SOCIETY LTD. 4.75 4.70 98.95 1
3210 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of MANGOLKOTE and NATUNHAT Piped Water Supply Scheme at Mangolkote Block , SM/07859 Retrofitting Extension and replacement of pipe line from the existing Distribution System within scheme jurisdiction at Mongalkote village under Mongalkote PWSS under Mongalkote Block within Katwa Sub-Division under Burdwan Division PHE Dte. [Sl No-03] Assistant Engineer ORD/000155/2022-2023 439/KTS 27/06/2022 30 NANGTASWAR CO. OP. LABOUR CONT. AND CONSTRUCTION SOCIETY LTD. 1.38 1.38 100 1
3211 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of MANGOLKOTE and NATUNHAT Piped Water Supply Scheme at Mangolkote Block , SM/07859 Retrofitting Material Requisition To Resource Division RTOR000116/2021-2022 1101/BWD 26/02/2022 0 Resource Division 9.23 0.00 0 0
3212 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of MANGOLKOTE and NATUNHAT Piped Water Supply Scheme at Mangolkote Block , SM/07859 Retrofitting Vehicle bill (Car No.-WB-04G-7127) for the month of September'2023. BILL/01680/2023-2024 1041/JJM 11/12/2023 0 PARTHA PRATIM ACHARYA 0.39 0.00 0 0
3213 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of MANGOLKOTE and NATUNHAT Piped Water Supply Scheme at Mangolkote Block , SM/07859 Retrofitting Laying of 150 mm dia. D.I distribution pipe line and restoration of drainage system at Mojlish Dighir Par at Mongalkote under MONGALKOTE Piped Water Supply Scheme under Mongalkote Block under Katwa Sub-Division under Burdwan Division, P.H.E. Dte. Assistant Engineer ORD/000615/2021-2022 1577/BWD 16/03/2022 30 ASMA ENTERPRISE 7.93 0.00 0 1
3214 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Gopalpur Piped Water Supply Scheme , SM/07800 Retrofitting Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Paschim Gopalpur (Part) village (Jadabbati, Mirapur & Paschim Gopalpur (Part) habitation) & Radhanagar village (Radhanagar habitation) of Paschim Gopalpur Piped Water Supply Scheme within Katwa Sub-Divn. under Burdwan Division, PHE. Dte. [Sl. No. : ¿14¿] Assistant Engineer ORD/000711/2020-2021 64/BWD 05/01/2021 15 ASMA ENTERPRISE 4.86 4.86 100 1
3215 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Gopalpur Piped Water Supply Scheme , SM/07800 Retrofitting Extension of pipe line from the existing Distribution System within scheme jurisdiction at Paschim Gopalpur & Mirapur village under Paschim Gopalpur PWSS under Katwa Sub-Division under Burdwan Division PHE Dte. (Sl No-1) Assistant Engineer ORD/000236/2021-2022 698/KTS 27/10/2021 15 ASMA ENTERPRISE 1.06 1.06 100 1
3216 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Gopalpur Piped Water Supply Scheme , SM/07800 Retrofitting Providing Functional Household Tap Connection from existing distribution system at Sukhpukuria village under Gotistha Gram Panchayet under Mongalkote Block under Paschim Gopalpur PWSS under Katwa Sub-Division under Burdwan Division PHE Dte. (Sl No-2) Assistant Engineer ORD/000274/2021-2022 799/KTS 10/12/2021 15 JAMALUDDIN SK 3.69 3.67 99.46 1
3217 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Gopalpur Piped Water Supply Scheme , SM/07800 Retrofitting Providing leftout water tap connection in different villages for 100% coverage to make it Sajal Gram from existing distribution system within scheme jurisdiction of different Piped Water Supply Schemes within Mongalkote Block under Burdwan Division, PHE. Dte. Assistant Engineer ORD/000407/2021-2022 284/BWD 17/01/2022 30 BABUL SK 6.81 0.41 6.02 1
3218 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Gopalpur Piped Water Supply Scheme , SM/07800 Retrofitting Providing Functional Household Tap Connection at Jadabbati,Sukhpukuria and Pilsona habitation of Paschim Gopalpur, Sukhpukuria and Pilsona village of Gotistha G.P. from existing distribution system within the command area of Paschim Gopalpur PWSS under Mongalkote Block under Katwa Sub-Division under Burdwan Division PHE Dte. Assistant Engineer ORD/000591/2021-2022 1439/BWD 11/03/2022 30 PARTHA PRATIM ACHARYA 10.47 10.41 99.43 1
3219 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Gopalpur Piped Water Supply Scheme , SM/07800 Retrofitting Repairing, height increasing & dewatering from Valve Chamber of Paschim Gopalpur PWSS under Katwa Sub-Division, Block- Mongolkote , Burdwan Division PHE Dte. (Sl No -1) Assistant Engineer JUNIOR ENGINEER KATWA SUB-DIVISION PHE DTE ORD/001058/2024-2025 1597/KTS 13/11/2024 45 ADRIJA ENTERPRISES 0.93 0.00 0 100
3220 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Jalahati Piped Water Supply Scheme at Purbasthali-I Block , SM/07803 Retrofitting Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Jalahati (P) village (Jalahati (P) habitation) of Jalahati Piped Water Supply Scheme within Kalna Sub-Divn. under Burdwan Division, PHE. Dte. [SL. No. : 26] Assistant Engineer ORD/000413/2020-2021 1462/BWD 18/02/2021 15 BARDHAMAN AQUA ENGINEERING 4.86 9.73 200.21 1
3221 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Jalahati Piped Water Supply Scheme at Purbasthali-I Block , SM/07803 Retrofitting Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Jalahati (P)village (Beltalapara habitation) of Jalahati Piped Water Supply Scheme within Kalna Sub-Divn. under Burdwan Division, PHE. Dte. (Part-A). [SL. No. : 24] Assistant Engineer ORD/000415/2020-2021 1465/BWD 18/02/2021 15 SETH ENTERPRISE 4.82 9.73 201.87 1
3222 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Jalahati Piped Water Supply Scheme at Purbasthali-I Block , SM/07803 Retrofitting Continuation work order for Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Jalahati village of Jalahati piped water supply scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. [Phase-I](Tr No.-768/BWD/2020-21) Assistant Engineer ORD/000387/2020-2021 4793/1/BWD 03/12/2020 30 SETH ENTERPRISE 4.92 9.84 200 1
3223 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Jalahati Piped Water Supply Scheme at Purbasthali-I Block , SM/07803 Retrofitting Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Jalahati (P) village (Beltalapara habitation) of Jalahati Piped Water Supply Scheme within Kalna Sub-Divn. under Burdwan Division, PHE. Dte. (Part-B). [SL. No. : 25] Assistant Engineer ORD/000414/2020-2021 1464/BWD 18/02/2021 15 YOUNG ENGINEERS CO.-OPERATIVE SOCIETY LTD. 4.86 9.73 200.21 1
3224 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Jalahati Piped Water Supply Scheme at Purbasthali-I Block , SM/07803 Retrofitting Providing 350 Nos. FHTC work at JALAHATI W/S scheme for Sajal Gram (As per Field Verification Report for Har Ghar Jal Certification) within Purbasthali-I Block including leftout household water tap connection (FHTC) under Burdwan Division, PHE Dte. Assistant Engineer ORD/000800/2022-2023 1520/BWD 28/03/2023 30 IYASIN DAFADAR 14.47 13.57 93.78 0
3225 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Jalahati Piped Water Supply Scheme at Purbasthali-I Block , SM/07803 Retrofitting Construction of 350cum OHR & Other Allied Works in connection with Augmentation of (SM/07803), (SM/09410), (SM/16304), (SM/15172) & (SM/14020) Piped Water Supply Scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/001048/2024-2025 220/BWD 10/01/2025 270 R.K. MANDAL& CO. 491.79 0.00 0 1
3226 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of AUGMENTATION OF PURBASTHALI Piped Water Supply Scheme at Purbasthali-II Block , SM/07866 Retrofitting Providing Functional Household tap connection from existing distribution system within the command area of Augmentation of Purbasthali piped water supply scheme at Palaspuli village (Mouza), Purbasthali-II Block under Burdwan Division, PHE Dte. Assistant Engineer ORD/000680/2020-2021 993./BWD 04/02/2021 45 IJABUL SEKH 51.07 0.00 0 1
3227 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of AUGMENTATION OF PURBASTHALI Piped Water Supply Scheme at Purbasthali-II Block , SM/07866 Retrofitting Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of Augmentation of Purbasthali Piped Water Supply Scheme at Chupi Village (Mouza), Purbasthali-II Block under Burdwan Division, PHE Dte._2ND CALL Assistant Engineer ORD/000681/2020-2021 1589/BWD 22/02/2021 45 DHIRENDRA ENGINEERING & CONSTRUCTION 70.28 55.84 79.45 1
3228 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of AUGMENTATION OF PURBASTHALI Piped Water Supply Scheme at Purbasthali-II Block , SM/07866 Retrofitting Supply of materials for different water supply scheme under Burdwan Division, PHE Dte. VCH/001237/2021-2022 1132/DW 26/02/2022 0 EXECUTIVE ENGINEER, RESOURCES DIVISION, P.H.E. DTE. 221.00 0.00 0 0
3229 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of AUGMENTATION OF PURBASTHALI Piped Water Supply Scheme at Purbasthali-II Block , SM/07866 Retrofitting Extension of different dia UPVC Pipeline (suggested) as per survey of Horizon of Zone-III portion of Surface Based W/S Scheme in Arsenic Affected Areas of Purbasthali - II Block within Kalna Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer ORD/000009/2021-2022 3136/BWD 03/06/2021 60 ASHOK KUMAR GHOSH 34.74 34.29 98.7 1
3230 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of AUGMENTATION OF PURBASTHALI Piped Water Supply Scheme at Purbasthali-II Block , SM/07866 Retrofitting Extension of different dia UPVC pipeline (suggested) as per survey of Horizon of Zone-I portion of surface based water supply scheme in Arsenic affected areas of Purbasthali-II Block within Kalna Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer ORD/000810/2020-2021 826/BWD 01/02/2021 60 DEY NIRMAN 24.83 2.77 11.16 1
3231 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of AUGMENTATION OF PURBASTHALI Piped Water Supply Scheme at Purbasthali-II Block , SM/07866 Retrofitting Extension of different dia UPVC pipeline (suggested) as per survey of Horizon of Zone-IV portion of surface Based Water supply scheme in Arsenic affected areas of Purbasthali-II Block within Kalna Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer ORD/000865/2020-2021 754/BWD 29/01/2021 60 INVENT ENGINEERS CO. OPERATIVE SOCIETY LTD. 20.95 6.92 33.03 1
3232 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of AUGMENTATION OF PURBASTHALI Piped Water Supply Scheme at Purbasthali-II Block , SM/07866 Retrofitting Construction of Pump House cum chlorine room (3.6 mtr x 3.0 mtr room) without sanitary and water supply arrangement at old Head Work Site of Purbasthali & it's adj. mouzas water supply scheme within Kalna Sub-Division under Burdwan Division, PHE Dte.^ (Sl No-C) Assistant Engineer ORD/000323/2021-2022 986/KSD Dt- 24.09.2021 24/09/2021 60 SURATH DEY 2.84 2.74 96.48 1
3233 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of AUGMENTATION OF PURBASTHALI Piped Water Supply Scheme at Purbasthali-II Block , SM/07866 Retrofitting Laying of different dia UPVC pipe at the balance portion of different section for Augmentation of Purbasthali & its adjoining mouzas water supply scheme within Kalna Sub-Division, under Burdwan Division, PHE Dte.[Part-C][Gr.-C] Assistant Engineer ORD/000868/2020-2021 31/KSD 11/01/2021 45 INDIAN ENGINEERS CO.-OPERATIVE SOCIETY LTD. 4.68 0.00 0 1
3234 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of AUGMENTATION OF PURBASTHALI Piped Water Supply Scheme at Purbasthali-II Block , SM/07866 Retrofitting Relaying of different dia UPVC pipeline at damaged portion as shown by Horizon of Zone-III of surface based water supply scheme within Kalna Sub-Division under Burdwan Division, PHE Dte.[SL-B] Assistant Engineer ORD/000959/2020-2021 148/KSD 12/02/2021 30 CHANCHAL PAL 4.82 0.00 0 1
3235 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of AUGMENTATION OF PURBASTHALI Piped Water Supply Scheme at Purbasthali-II Block , SM/07866 Retrofitting Work Order for "Providing Functional house hold tap connections for Sajal Gram Village within Purbasthali-II Block under Kalna Sub-Division under Burdwan Division, PHE Dte. (Purbasthali Aug & Kamalnagar water supply scheme)" JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000027/2023-2024 346/KSD 17/04/2023 30 RAJESH DAFADAR 0.88 0.84 95.45 100
3236 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of AUGMENTATION OF PURBASTHALI Piped Water Supply Scheme at Purbasthali-II Block , SM/07866 Retrofitting Work Order for "Repairing and laying of UPVC pipeline of Majida, Nimdaha, Lakshmipur and Ukhura village for smooth running of FHTC work of Surface Based Water Supply Scheme within Kalna Sub-Division under Burdwan Division, PHE Dte." JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000548/2023-2024 1303/KSD 23/08/2023 15 PARTHA PRATIM ACHARYA 1.00 1.00 100 100
3237 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of AUGMENTATION OF PURBASTHALI Piped Water Supply Scheme at Purbasthali-II Block , SM/07866 Retrofitting Hire and labour charges for staging and scaffolding bamboo barricading and removal of rubbish for dismantling capacity 136 Cum of RCC Over Head Reservoir at Purbasthali & it's adj. mouzas water Supply Scheme within Kalna Sub Divison under Burdwan Division , PHE Dte. (Sl No-A) Assistant Engineer ORD/000327/2021-2022 967/KSD Dt-20.09.2021 20/09/2021 30 INVENT ENGINEERS CO. OPERATIVE SOCIETY LTD. 4.47 2.56 57.27 1
3238 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of AUGMENTATION OF PURBASTHALI Piped Water Supply Scheme at Purbasthali-II Block , SM/07866 Retrofitting Material Requisition To Resource Division RTOR000120/2021-2022 1111/BWD 26/02/2022 0 Resource Division 37.62 0.00 0 0
3239 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of AUGMENTATION OF PURBASTHALI Piped Water Supply Scheme at Purbasthali-II Block , SM/07866 Retrofitting Hire & fuel charges of vehicle Car No.-WB-41J-6795 for the month of June & July2023. BILL/01035/2023-2024 745/JJM 11/10/2023 0 MD HASIN 0.79 0.00 0 0
3240 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of AUGMENTATION OF PURBASTHALI Piped Water Supply Scheme at Purbasthali-II Block , SM/07866 Retrofitting Providing Functional Household Tap Connection (FHTC) at balance portion from existing distribution system within the command area of Aug. of PURBASTHALI Piped Water Supply Scheme at Chupi village (Mouza), Purbasthali - II Block under Burdwan Division, PHE Dte. Assistant Engineer ORD/000028/2022-2023 2079/BWD 20/04/2022 30 M/S K.P. CONSTRUCTION 39.64 22.64 57.11 100
3241 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of AUGMENTATION OF PURBASTHALI Piped Water Supply Scheme at Purbasthali-II Block , SM/07866 Retrofitting Providing functional household tap connection (FHTC) from existing distribution system within the command area of Augmentation of Purbasthali piped water supply scheme at Palaspuli village (Mouza), Purbasthali-II Block under burdwan Division, PHE Dte. Assistant Engineer ORD/000587/2020-2021 993/BWD 04/02/2021 45 IJABUL SEKH 51.07 63.00 123.36 0
3242 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of AUGMENTATION OF PURBASTHALI Piped Water Supply Scheme at Purbasthali-II Block , SM/07866 Retrofitting Different Types of work involved in connection with Augmentation of 6 Nos. [(SM/07827), (SM/07866), (SM/16196), (SM/18314), (SM/16021), (SM/16019)] Piped Water Supply Scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/001144/2024-2025 618/BWD 11/02/2025 180 M/S DATTA ENTERPRISE 578.09 0.00 0 0
3243 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) under the command area of Kenna Piped Water Supply Scheme , SM/07544 Retrofitting Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Kailaspur Habitation of Kenna Piped Water Supply Scheme within Burdwan Sub-Divn. under Burdwan Division, PHE. Dte. [GROUP : ¿L¿] (T.R. No. 201/BWD of 2020-2021) ORD/000161/2020-2021 2399/BWD 20/07/2020 30 BRINDABAN KONAR 4.92 0.00 0 1
3244 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) under the command area of Kenna Piped Water Supply Scheme , SM/07544 Retrofitting Continuation work order for Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Kailaspur Habitation of Kenna Piped Water Supply Scheme within Burdwan Sub-Divn. under Burdwan Division, PHE. Dte. [GROUP : ¿L¿] (T.R. No. 248/BWD of 2020-2021) Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000162/2020-2021 3517/BWD 25/09/2020 30 BRINDABAN KONAR 4.92 0.00 0 1
3245 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) under the command area of Kenna Piped Water Supply Scheme , SM/07544 Retrofitting Continuation work order for Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Kenna village of Kenna piped water supply scheme within Burdwan Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000604/2020-2021 1225/BWD 11/02/2021 30 BRINDABAN KONAR 4.92 9.84 200 1
3246 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) under the command area of Kenna Piped Water Supply Scheme , SM/07544 Retrofitting Extension of pipeline for Kenna Water Supply Scheme (Kenna, Dahura, Kailashpur, Dadur, Baral Village) within Memari - I Block including leftout household water tap connection (FHTC) under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000207/2021-2022 6307/BWD 09/11/2021 60 T.K. BANERJEE & CO. 41.46 41.02 98.94 1
3247 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) under the command area of Kenna Piped Water Supply Scheme , SM/07544 Retrofitting Extension of pipeline for KENNA Piped Water Supply Scheme at Kaliashpur 25 Nos FHTC Work for Sajal Gram (As per Field Verification Report for Har Ghar Jal Certification within Memari-I Block including leftout household water tap connection (FHTC) under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. Junior Engineer, RWS, Memari-I Dev. Bolck ORD/000848/2022-2023 1391-A/BSD 08/08/2022 5 BRINDABAN KONAR 0.97 0.00 0 0
3248 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) under the command area of Kenna Piped Water Supply Scheme , SM/07544 Retrofitting Providing leftout water tap connection in different villages for 100% coverage to make it Sajal Gram from existing distribution system within scheme jurisdiction of different Piped Water Supply Schemes within Memari-I Block (Daluibazar-II, Gopegantar-I & II G.P.) under Burdwan Division, PHE. Dte. Dte._Part-A. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000371/2021-2022 209/BWD 11/01/2022 30 M/S ANAND CONSTRUCTION 21.11 5.00 23.69 1
3249 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) under the command area of Kenna Piped Water Supply Scheme , SM/07544 Retrofitting Hire & fuel charges of vehicle (Car No.-WB-41G-2149) for the office of the Assistant Engineer, Burdwan Sub-Division, PHE Dte. for the month of February'23. BILL/00565/2022-2023 1226/JJM 20/03/2023 0 SK.ASFIA 0.40 0.00 0 0
3250 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) under the command area of Kenna Piped Water Supply Scheme , SM/07544 Retrofitting Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of KENNA Piped Water Supply Scheme at Dandur, Kailashpur (2 Nos. Habitation) village (Mouza), Memari - I Block under Burdwan Division, PHE Dte.[Agreement No. 570/BWD OF 2020-2021.] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000329/2020-2021 438/BWD 19/01/2021 30 BRINDABAN KONAR 22.09 43.57 197.24 0
3251 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting at Srikhanda PWSS , SM/06773 Retrofitting Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of SRIKHANDA Piped Water Supply Scheme at Katwa - I Block under Burdwan Division, PHE Dte.(Agreement No. 53/2020-2021 OF SE/CC/PHE. DTE.) Assistant Engineer ORD/000121/2020-2021 4880/BWD 07/12/2020 90 ASHOK KUMAR GHOSH 96.84 75.09 77.54 1
3252 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting at Srikhanda PWSS , SM/06773 Retrofitting Continuation work order for supply of 10 mm NB Gun-Metal /Brass Ferrul conforming to IS:2692-1989 for water tap connection in each household from existing distribution system within scheme jurisdiction in different piped water supply scheme within Durgapur (Bardhaman North) Sub-Division under Burdwan Division, PHE Dte. and delivered at Barsul Divisional Store.[Part-7] Assistant Engineer ORD/000348/2021-2022 2942/BWD 04/05/2021 10 KISHORE GHOSH 3.94 3.44 87.31 1
3253 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting at Srikhanda PWSS , SM/06773 Retrofitting Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Bohar village and Bohar habitation of Satgachia piped water supply scheme within Burdwan Sub-Division under Burdwan Division, PHE Dte. [Phase-I](Tr No.-435/BWD/2020-21) ORD/000507/2020-2021 3327/BWD 18/09/2020 30 TARAMA AGENCY 4.86 9.66 198.77 0
3254 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting at Srikhanda PWSS , SM/06773 Retrofitting Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Jakra village and Jakra Paschimpara habitation of Satgachhia piped water supply scheme within Burdwan Sub-Division under Burdwan Division, PHE Dte. [Phase-I](Tr No.-383/BWD/2020-21) ORD/000511/2020-2021 3328/BWD 18/09/2020 30 A R TRADERS 4.86 9.72 200 0
3255 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting at Srikhanda PWSS , SM/06773 Retrofitting Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Jakra (Part) village (Innathgore Habitation) & Bohat (Part) village (Hamunpur Habitation) of Satgachia piped water supply scheme within Burdwan Sub-Division under Burdwan Division, PHE Dte.[Sl No.-21] ORD/000793/2020-2021 71/BWD 05/01/2021 15 A R TRADERS 4.86 9.71 199.79 0
3256 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting at Srikhanda PWSS , SM/06773 Retrofitting Continuation work order for water tap connection in each house hold from existing distribution system within scheme jurisdiction in Bohar village and Bohar habitation of Satgachia piped water supply scheme within Burdwan Sub-Division under Burdwan Division, PHE Dte.[Phase-I][Gr.-4B] ORD/000794/2020-2021 4990/BWD 10/12/2020 30 TARAMA AGENCY 4.86 9.37 192.8 0
3257 PURBA BARDHAMAN Burdwan Division Providing Functional House hold Tap Connection (FHTC) by retrofitting within the command area of Bagila piped Water Supply Scheme at Memari-I Block under Burdwan Division, P.H.E. DTE. , SM/08704 Retrofitting Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Bagila village (Bagila Habitation) of Bagila piped water supply scheme within Burdwan Sub-Division under Burdwan Division, PHE Dte.(Part-A)[SL NO.-08] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000745/2020-2021 587./BWD 25/01/2021 15 PAL CONSTRUCTION 4.86 9.71 199.79 1
3258 PURBA BARDHAMAN Burdwan Division Providing Functional House hold Tap Connection (FHTC) by retrofitting within the command area of Bagila piped Water Supply Scheme at Memari-I Block under Burdwan Division, P.H.E. DTE. , SM/08704 Retrofitting Providing Functional Household Tap Connection(FHTC) from existing distribution system within the command area of BAGILA Piped Water Supply Scheme at Kiskinda (2 nos Hab), Krishnapur, Talchini & Bagila (Part) Village (Mouza), Memari-I Block under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000149/2021-2022 4659/BWD 10/09/2021 60 HAMID SK 60.69 53.57 88.27 1
3259 PURBA BARDHAMAN Burdwan Division Providing Functional House hold Tap Connection (FHTC) by retrofitting within the command area of Bagila piped Water Supply Scheme at Memari-I Block under Burdwan Division, P.H.E. DTE. , SM/08704 Retrofitting Extension of pipe line for BAGILA Piped Water Supply Scheme at Krishnapur,Baharampur,Kiskindha,Taktipur in Memari-I Block including leftout household water tap connection (FHTC) under Burdwan Division, PHE Dte.Group : A Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000102/2022-2023 983/BSD 16/06/2022 30 A R TRADERS 4.83 4.83 100 1
3260 PURBA BARDHAMAN Burdwan Division Providing Functional House hold Tap Connection (FHTC) by retrofitting within the command area of Bagila piped Water Supply Scheme at Memari-I Block under Burdwan Division, P.H.E. DTE. , SM/08704 Retrofitting Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Bagila village (Bagila Habitation) of Bagila piped water supply scheme within Burdwan Sub-Division under Burdwan Division, PHE Dte.(Part-B)[SL NO.-09] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE.,Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000746/2020-2021 585./BWD 25/01/2021 15 HAMID SK 4.87 9.73 199.79 1
3261 PURBA BARDHAMAN Burdwan Division Providing Functional House hold Tap Connection (FHTC) by retrofitting within the command area of Bagila piped Water Supply Scheme at Memari-I Block under Burdwan Division, P.H.E. DTE. , SM/08704 Retrofitting Extension of pipeline for BAGILA Water Supply Scheme at (Baharampur, Taktipur, Krishnapur & Kiskinda North East) village within Memari I Block, under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000669/2021-2022 1708/BWD 25/03/2022 30 A R TRADERS 27.27 27.27 100 1
3262 PURBA BARDHAMAN Burdwan Division Providing Functional House hold Tap Connection (FHTC) by retrofitting within the command area of Bagila piped Water Supply Scheme at Memari-I Block under Burdwan Division, P.H.E. DTE. , SM/08704 Retrofitting Sinking of additional 250 X 200mm dia Tube Well 150 mtr. Depth by D.R. Rig method using UPVC pipe (CD) and UPVC Deep Well Screen (RDS) for BAGILA Piped Water Supply Scheme, Block - Memari - II, Dist - Purba Bardhaman under Burdwan Division, PHE Dte._ 2ND CALL Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000257/2022-2023 3503/BWD 10/08/2022 30 MUNSHI ENTERPRISE 10.18 0.00 0 1
3263 PURBA BARDHAMAN Burdwan Division Providing Functional House hold Tap Connection (FHTC) by retrofitting within the command area of Bagila piped Water Supply Scheme at Memari-I Block under Burdwan Division, P.H.E. DTE. , SM/08704 Retrofitting Emergency repaired cleaning of chokage AC Pipeline for (Retrofittins) for BAGILA Piped water supply scheme at Baharampur, Takipur & Kiskinda village for smooth drinking water supply (FHTC) within Memari-I Block under Burdwan Division, PHE Dte. Gr.A Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000561/2022-2023 1918/BSD 11/11/2022 15 A R TRADERS 0.93 0.93 100 1
3264 PURBA BARDHAMAN Burdwan Division Providing Functional House hold Tap Connection (FHTC) by retrofitting within the command area of Bagila piped Water Supply Scheme at Memari-I Block under Burdwan Division, P.H.E. DTE. , SM/08704 Retrofitting Sinking of additional tube well 250 x 200 mm dia Tube well 150 mtr depth by D.R. Rig method using upvc pipe (CD) and fibre glass strainer for Bagila piped water supply scheme (2nd tube well site), Block-Memari-I under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/001312/2020-2021 1494/BWD 18/02/2021 30 C.M. ENTERPRISE 8.68 8.21 94.59 0
3265 PURBA BARDHAMAN Burdwan Division Providing Functional House hold Tap Connection (FHTC) by retrofitting within the command area of Bagila piped Water Supply Scheme at Memari-I Block under Burdwan Division, P.H.E. DTE. , SM/08704 Retrofitting Preparation and Submission of DPR for Augmentation of Ground Water Based Piped Water Supply Scheme for MAHESHDANGA, Block:Memari-I under Burdwan Division, P.H.E Dte. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000988/2024-2025 1909/BSD 28/08/2024 15 CARTO 0.00 0.00 NAN 0
3266 PURBA BARDHAMAN Burdwan Division Providing Functional House hold Tap Connection (FHTC) by retrofitting within the command area of Bagila piped Water Supply Scheme at Memari-I Block under Burdwan Division, P.H.E. DTE. , SM/08704 Retrofitting Continuation work order for Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Bagila village (Bagila habitation) of Bagila Piped Water Supply Scheme within Burdwan Sub-Divn. under Burdwan Division, PHE. Dte. (Part - B) [SL. No. : 09] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000042/2021-2022 3465/BWD 29/06/2021 15 HAMID SK 4.87 9.73 199.79 0
3267 PURBA BARDHAMAN Burdwan Division Providing Functional House hold Tap Connection (FHTC) by retrofitting within the command area of Bagila piped Water Supply Scheme at Memari-I Block under Burdwan Division, P.H.E. DTE. , SM/08704 Retrofitting Continuation work order for Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Bagila village (Bagila habitation) of Bagila Piped Water Supply Scheme within Burdwan Sub-Divn. under Burdwan Division, PHE. Dte. (Part - A) [SL. No. : 08] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000034/2021-2022 3406/BWD 25/06/2021 15 PAL CONSTRUCTION 4.86 9.71 199.79 0
3268 PURBA BARDHAMAN Burdwan Division Providing Functional House hold Tap Connection (FHTC) by retrofitting within the command area of Bagila piped Water Supply Scheme at Memari-I Block under Burdwan Division, P.H.E. DTE. , SM/08704 Retrofitting Restoration of Pump House at Head Work site of BAGILA Piped water supply scheme at Memari-I Block under Burdwan Division, Dist.-Purba Bardhaman Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000126/2024-2025 1006/BSD 06/06/2024 30 A.R. TRADERS 0.96 0.95 98.96 100
3269 PURBA BARDHAMAN Burdwan Division Providing Functional House hold Tap Connection (FHTC) by retrofitting within the command area of Bagila piped Water Supply Scheme at Memari-I Block under Burdwan Division, P.H.E. DTE. , SM/08704 Retrofitting MAINTENANCE OF ROAD (WHISH IS DAMAGED FOR LAYING PIPELINE BY PHE DEPTT) NAMELY NARUGRAM H.C TO BADSHI ROAD VIDE- PACKAGE NO- WB 22 12 UNDER PMGSY-III UNDER NARUGRAM GP. & RAINA-I BLOCK, IN PURBA BARDHAMAN DISTRICT BILL/00740/2024-2025 894/JJM 25/09/2024 0 EXECUTIVE ENGINEER (WBSRDA) PURBA BARDHAMAN DIVISION 3.86 0.00 0 0
3270 PURBA BARDHAMAN Burdwan Division Providing Functional House hold Tap Connection (FHTC) by retrofitting within the command area of Bagila piped Water Supply Scheme at Memari-I Block under Burdwan Division, P.H.E. DTE. , SM/08704 Retrofitting Laying of 150mm DI pipeline for interconnection of 4no tw to distribution line & Kalsi mouza 3rd tw to distribution line for Bagila Piped Water Supply Scheme under memari-I Block, District:- Purba-Bardhaman. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/001071/2024-2025 105/BSD 16/01/2025 30 A.R. TRADERS 1.88 0.00 0 0
3271 PURBA BARDHAMAN Burdwan Division Providing Functional House hold Tap Connection (FHTC) by retrofitting within the command area of Bagila piped Water Supply Scheme at Memari-I Block under Burdwan Division, P.H.E. DTE. , SM/08704 Retrofitting Construction of switch room cum chlorine room without toilet room at 4th Tube well site according to departmental drawing no.- PHE/BD/P.H/DRG-01/DCE-2017 for Bagila piped water supply scheme at Sanghatipally under Memari-I Block under Burdwan Sub-Division, PHE Dte within Burdwan Division PHE Dte. Dist- Purba Bardhaman. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000043/2025-2026 1025/BSD 08/05/2025 90 H SAMANTA 4.16 0.00 0 100
3272 PURBA BARDHAMAN Jamalpur Burdwan Division GROUND WATER BASED SELIMABAD PIPED WATER SUPPLY SCHEME JAMALPUR BLOCK PURBA BARDHAMAN , SM/11492 New Material Requisition To Resource Division RTOR000052/2022-2023 5524/BWD 23/12/2022 0 Resource Division 12.41 0.00 0 0
3273 PURBA BARDHAMAN Jamalpur Central Mechanical GROUND WATER BASED SELIMABAD PIPED WATER SUPPLY SCHEME JAMALPUR BLOCK PURBA BARDHAMAN , SM/11492 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 at Selimabad Water Supply Scheme [ Block- Jamalpur ] under CMD, PHE Dte., Dist.- Purba-Bardhaman ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000611/2022-2023 3117/CMD 23/11/2022 30 M/S. DAS ELECTRIC CO. 11.08 10.67 96.3 80
3274 PURBA BARDHAMAN Jamalpur Central Drilling GROUND WATER BASED SELIMABAD PIPED WATER SUPPLY SCHEME JAMALPUR BLOCK PURBA BARDHAMAN , SM/11492 New PROVIDING TUBE WELLMATERIALS CONFORMING TO IS: 12818:2010 WITH OTHER WORKS AT SITE FOR CONSTRUCTION OF TUBE WELL AT SELIMABAD PWSS (TW-I), JAMALPUR BLOCK UNDER PURBA BARDHAMAN, CDD, PHE DTE. ORD/000286/2022-2023 313/CMSD-I 22/07/2022 15 UTTAM KUMAR CHATTERJEE 3.29 3.16 96.05 1
3275 PURBA BARDHAMAN Jamalpur Central Drilling GROUND WATER BASED SELIMABAD PIPED WATER SUPPLY SCHEME JAMALPUR BLOCK PURBA BARDHAMAN , SM/11492 New PROVIDING DRILLING CREWS FOR CONSTRUCTION OF TUBE WELL (250MM X 150MM) BY DEPARTMENTAL RIG MACHINE FOR SELIMABAD PWSS (TW-I), JAMALPUR BLOCK UNDER PURBA BARDAMAN, CDD, PHE DTE. ORD/000285/2022-2023 312/CMSD-I 22/07/2022 15 UTTAM KUMAR CHATTERJEE 1.74 1.38 79.31 1
3276 PURBA BARDHAMAN Jamalpur Central Drilling GROUND WATER BASED SELIMABAD PIPED WATER SUPPLY SCHEME JAMALPUR BLOCK PURBA BARDHAMAN , SM/11492 New PROVIDING PEA SIZE GRAVELS AND BENTONITE POWDER SODIUM BASED AT SITE WITH OTHER WORKS FOR CONSTRUCTION OF TUBE WELL AT SELIMABAD PWSS (TW-I), JAMALPUR BLOCK UNDER PURBA BARDHAMAN, CDD, PHE DTE. ORD/000291/2022-2023 315/CMSD-I 12/07/2022 15 UTTAM KUMAR CHATTERJEE 1.88 1.19 63.3 1
3277 PURBA BARDHAMAN Jamalpur Central Drilling GROUND WATER BASED SELIMABAD PIPED WATER SUPPLY SCHEME JAMALPUR BLOCK PURBA BARDHAMAN , SM/11492 New Providing Drilling crew and other allied works for construction of Tube well (250mm x 150mm) by utilising Departmental machineries for Selimabad PWSS(TW-I), Jamalpur block under Purba Bardhaman District, CDD PHE Dte. ORD/000450/2022-2023 322/CMSD-I(D) 12/07/2022 15 M/S SREEJIT ENTERPRISE 1.73 1.55 89.6 100
3278 PURBA BARDHAMAN Jamalpur Central Drilling GROUND WATER BASED SELIMABAD PIPED WATER SUPPLY SCHEME JAMALPUR BLOCK PURBA BARDHAMAN , SM/11492 New Providing pea size Gravels and Bentonite Powder sodium based at site with other works for construction of Tube well at Selimabad PWSS(TW-II), Jamalpur block under Purba Bardhaman District, CDD PHE Dte. ORD/000451/2022-2023 324/CMSD-I(D) 12/07/2022 15 M/S SREEJIT ENTERPRISE 1.88 1.16 61.7 100
3279 PURBA BARDHAMAN Jamalpur Central Drilling GROUND WATER BASED SELIMABAD PIPED WATER SUPPLY SCHEME JAMALPUR BLOCK PURBA BARDHAMAN , SM/11492 New Providing Tube well materials conforming to IS: 12818:2010 with other works at site for construction of Tube well at Selimabad PWSS(TW-II), Jamalpur block under Purba Bardhaman District, CDD PHE Dte. ORD/000452/2022-2023 321/CMSD-I(D) 12/07/2022 15 M/S SREEJIT ENTERPRISE 3.28 3.24 98.78 100
3280 PURBA BARDHAMAN Jamalpur Burdwan Division GROUND WATER BASED SELIMABAD PIPED WATER SUPPLY SCHEME JAMALPUR BLOCK PURBA BARDHAMAN , SM/11492 New Material Requisition To Resource Division RTOR000117/2023-2024 2155/BWD 10/05/2023 0 Resource Division 5.49 0.00 0 0
3281 PURBA BARDHAMAN Jamalpur Central Mechanical GROUND WATER BASED SELIMABAD PIPED WATER SUPPLY SCHEME JAMALPUR BLOCK PURBA BARDHAMAN , SM/11492 New New service connection charges for Selimabad PWSS TW-2 BILL/01523/2023-2024 BP-2023-24-191 09/10/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 5.82 0.00 0 0
3282 PURBA BARDHAMAN Jamalpur Central Mechanical GROUND WATER BASED SELIMABAD PIPED WATER SUPPLY SCHEME JAMALPUR BLOCK PURBA BARDHAMAN , SM/11492 New New service connection charges for Selimabad W/S Scheme TW-1 BILL/00607/2023-2024 BP-2023-24-16 22/05/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 7.37 0.00 0 0
3283 PURBA BARDHAMAN Jamalpur Burdwan Division GROUND WATER BASED SELIMABAD PIPED WATER SUPPLY SCHEME JAMALPUR BLOCK PURBA BARDHAMAN , SM/11492 New Augmentation of SELIMABAD Piped Water Supply Scheme with LDS, FHTC, Rising main, Construction of 350 cum capacity OHR with 20.0 mtr. Staging height inclusive of soil investigation including construction of switch-rooms (5.40mx3.6m) & Boundary walls for new TW site under Jamalpur Block, District:- Purba-Burdwan. [Treated as "New Scheme in place of Augmentation" vide Corrigendum Notice No. 1545/CC, dated 02.08.2022.] AE(HQs) J.E. 3 BURDWAN,Junior Engineer, Burdwan Division ORD/000234/2022-2023 3386/BWD 04/08/2022 880 S. DUTTA 435.08 270.10 62.08 70
3284 PURBA BARDHAMAN Jamalpur Burdwan Division GROUND WATER BASED SELIMABAD PIPED WATER SUPPLY SCHEME JAMALPUR BLOCK PURBA BARDHAMAN , SM/11492 New Supply of one no. Diesel / LPG / CNG driven Motor Cab / Maxi Cab (Air Condition) on hire basis for the office of the Executive Engineer, Burdwan Division, P.H.E. Dte. to be used by the Assistant Engineer, Headquarters, P.H.E. Dte. [Period from 01.02.2024 to 31.03.2024] AE(HQs) J.E. 1 BURDWAN ORD/001206/2023-2024 44/AE/HQ 29/01/2024 60 SK. ASRAFUDDIN 0.80 0.80 100 50
3285 PURBA BARDHAMAN Jamalpur Burdwan Division GROUND WATER BASED SELIMABAD PIPED WATER SUPPLY SCHEME JAMALPUR BLOCK PURBA BARDHAMAN , SM/11492 New Continuation work for Supply of one no. Diesel / LPG / CNG driven Motor Cab / Maxi Cab (Air Condition) on hire basis for the office of the Executive Engineer, Burdwan Division, P.H.E. Dte. to be used by the Assistant Engineer, Headquarters, P.H.E. Dte. [Period from 01.04.2024 to 31.05.2024] AE(HQs) J.E. 1 BURDWAN ORD/001232/2023-2024 226/AE/HQ 27/03/2024 61 SK. ASRAFUDDIN 0.80 0.80 100 0
3286 PURBA BARDHAMAN Jamalpur Burdwan Division GROUND WATER BASED SELIMABAD PIPED WATER SUPPLY SCHEME JAMALPUR BLOCK PURBA BARDHAMAN , SM/11492 New Continuation work for Supply of one no. Diesel / LPG / CNG driven Motor Cab / Maxi Cab (Air Condition) on hire basis for the office of the Executive Engineer, Burdwan Division, P.H.E. Dte. to be used by the Assistant Engineer, Headquarters, P.H.E. Dte. [Period from 01.08.2024 to 30.09.2024] AE(HQs) Contractual Junior Engineer ORD/000506/2024-2025 545/AE/HQ 01/08/2024 61 SK. ASRAFUDDIN 0.80 0.80 100 0
3287 PURBA BARDHAMAN Jamalpur Burdwan Division GROUND WATER BASED SELIMABAD PIPED WATER SUPPLY SCHEME JAMALPUR BLOCK PURBA BARDHAMAN , SM/11492 New Continuation work for Supply of one no. Diesel / LPG / CNG driven Motor Cab / Maxi Cab (Air Condition) on hire basis for the office of the Executive Engineer, Burdwan Division, P.H.E. Dte. to be used by the Assistant Engineer, Headquarters, P.H.E. Dte. [Period from 01.06.2024 to 31.07.2024] AE(HQs) J.E. 1 BURDWAN ORD/000439/2024-2025 304/AE/HQ 31/05/2024 61 SK. ASRAFUDDIN 0.80 0.80 100 0
3288 PURBA BARDHAMAN Jamalpur Central Drilling GROUND WATER BASED SELIMABAD PIPED WATER SUPPLY SCHEME JAMALPUR BLOCK PURBA BARDHAMAN , SM/11492 New Providing pea size Gravels and Bentonite Powder sodium based at site with other works for construction of tube well at Selimabad PWSS( TW-III),Jamalpur Block under Purba Bardhaman ,Central Drilling Division, P.H.E Dte Driller In Charge Junior Engineer ORD/000064/2023-2024 269/CMSD-I(D) 04/12/2023 15 C.M. ENTERPRISE 1.88 0.78 41.49 100
3289 PURBA BARDHAMAN Jamalpur Central Drilling GROUND WATER BASED SELIMABAD PIPED WATER SUPPLY SCHEME JAMALPUR BLOCK PURBA BARDHAMAN , SM/11492 New Providing Tube well materials Conforming to IS: 12818:2010 with other Works at site for construction of Tube Well at Selimabad PWSS (TW-III),Jamalpur Block under Purba Bardhaman , Central Drilling Division, P.H.E Dte. Driller In Charge Junior Engineer ORD/000065/2023-2024 271/CMSD-I(D) 04/12/2023 15 C.M. ENTERPRISE 3.28 2.39 72.87 100
3290 PURBA BARDHAMAN Jamalpur Central Drilling GROUND WATER BASED SELIMABAD PIPED WATER SUPPLY SCHEME JAMALPUR BLOCK PURBA BARDHAMAN , SM/11492 New Providing drilling crews for construction of TW (250mm x 150mm) by Departmental Rig machine for Selimabad PWSS (TW-III), Jamalpur block under Purba Midnapur, CDD, PHE Dte. Driller In Charge Junior Engineer ORD/000146/2023-2024 270/CMSD-I(D) 04/12/2023 15 C.M. ENTERPRISE 1.73 1.55 89.6 100
3291 PURBA BARDHAMAN Jamalpur Central Mechanical GROUND WATER BASED SELIMABAD PIPED WATER SUPPLY SCHEME JAMALPUR BLOCK PURBA BARDHAMAN , SM/11492 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-2 at Selimabad Water Supply Scheme [ Block- Jamalpur ] under CMD, PHE Dte., Dist.- Purba-Bardhaman ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000612/2022-2023 3118/CMD 23/11/2022 30 SUBRATA BHADRA 11.07 10.72 96.84 95
3292 PURBA BARDHAMAN Jamalpur Burdwan Division GROUND WATER BASED SELIMABAD PIPED WATER SUPPLY SCHEME JAMALPUR BLOCK PURBA BARDHAMAN , SM/11492 New Quotation from WBSEDCL for new connection charges of Selimabad w/s scheme of T.W.-3 under Burdwan Division, PHE Dte. BILL/01932/2023-2024 1824/JJM 27/03/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LTD. 10.47 0.00 0 0
3293 PURBA BARDHAMAN Jamalpur Central Mechanical GROUND WATER BASED SELIMABAD PIPED WATER SUPPLY SCHEME JAMALPUR BLOCK PURBA BARDHAMAN , SM/11492 New NEW SERVICE CONNECTION FOR SELIMABAD PWSS. BILL/02698/2023-2024 BP-2023-24-565 23/02/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 0.66 0.00 0 0
3294 PURBA BARDHAMAN Jamalpur Central Mechanical GROUND WATER BASED SELIMABAD PIPED WATER SUPPLY SCHEME JAMALPUR BLOCK PURBA BARDHAMAN , SM/11492 New Additional Quotation for new service connection at Selimabad PWSS PH-3. BILL/00460/2024-2025 BP-2024-25-248 01/08/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 0.95 0.00 0 0
3295 PURBA BARDHAMAN Jamalpur Burdwan Division GROUND WATER BASED SELIMABAD PIPED WATER SUPPLY SCHEME JAMALPUR BLOCK PURBA BARDHAMAN , SM/11492 New Continuation work for Supply of one no. Diesel / LPG / CNG driven Motor Cab / Maxi Cab (Air Condition) on hire basis for the office of the Executive Engineer, Burdwan Division, P.H.E. Dte. to be used by the Assistant Engineer, Headquarters, P.H.E. Dte. [Period from 01.02.2025 to 31.03.2025] AE(HQs) Contractual Junior Engineer ORD/001155/2024-2025 187/AE/HQ 31/01/2025 59 SK. ASRAFUDDIN 0.80 0.76 95 0
3296 PURBA BARDHAMAN Jamalpur Burdwan Division GROUND WATER BASED SELIMABAD PIPED WATER SUPPLY SCHEME JAMALPUR BLOCK PURBA BARDHAMAN , SM/11492 New Continuation work for Supply of one no. Diesel / LPG / CNG driven Motor Cab / Maxi Cab (Air Condition) on hire basis for the office of the Executive Engineer, Burdwan Division, P.H.E. Dte. to be used by the Assistant Engineer, Headquarters, P.H.E. Dte. [Period from 01.12.2024 to 31.01.2025] AE(HQs) Contractual Junior Engineer ORD/000899/2024-2025 1012/AE/HQ 29/11/2024 61 SK. ASRAFUDDIN 0.80 0.80 100 0
3297 PURBA BARDHAMAN Jamalpur Burdwan Division GROUND WATER BASED SELIMABAD PIPED WATER SUPPLY SCHEME JAMALPUR BLOCK PURBA BARDHAMAN , SM/11492 New Continuation work for Supply of one no. Diesel / LPG / CNG driven Motor Cab / Maxi Cab (Air Condition) on hire basis for the office of the Executive Engineer, Burdwan Division, P.H.E. Dte. to be used by the Assistant Engineer, Headquarters, P.H.E. Dte. [Period from 01.10.2024 to 30.11.2024] AE(HQs) Contractual Junior Engineer ORD/000705/2024-2025 821/AE/HQ 01/10/2024 61 SK. ASRAFUDDIN 0.80 0.70 87.5 0
3298 PURBA BARDHAMAN Jamalpur Burdwan Division GROUND WATER BASED SELIMABAD PIPED WATER SUPPLY SCHEME JAMALPUR BLOCK PURBA BARDHAMAN , SM/11492 New Continuation work for Supply of one no. Diesel / LPG / CNG driven Motor Cab / Maxi Cab (Air Condition) on hire basis for the office of the Executive Engineer, Burdwan Division, P.H.E. Dte. to be used by the Assistant Engineer, Headquarters, P.H.E. Dte. [Period from 01.06.2025 to 31.07.2025] AE(HQs) Contractual Junior Engineer ORD/000170/2025-2026 685/AE/HQ 30/05/2025 61 SK. ASRAFUDDIN 0.80 0.00 0 0
3299 PURBA BARDHAMAN Jamalpur Burdwan Division GROUND WATER BASED SELIMABAD PIPED WATER SUPPLY SCHEME JAMALPUR BLOCK PURBA BARDHAMAN , SM/11492 New Continuation work for Supply of one no. Diesel / LPG / CNG driven Motor Cab / Maxi Cab (Air Condition) on hire basis for the office of the Executive Engineer, Burdwan Division, P.H.E. Dte. to be used by the Assistant Engineer, Headquarters, P.H.E. Dte. [Period from 01.04.2025 to 31.05.2025] AE(HQs) Contractual Junior Engineer ORD/001406/2024-2025 453/AE/HQ 28/03/2025 61 SK. ASRAFUDDIN 0.80 0.77 96.25 0
3300 PURBA BARDHAMAN Jamalpur Burdwan Division GROUND WATER BASED SELIMABAD PIPED WATER SUPPLY SCHEME JAMALPUR BLOCK PURBA BARDHAMAN , SM/11492 New Laying of additional pipeline (HDPE) with interconnection from Selimabad 3rd Pump House to BDO Office under Selimabad PWSS, Jamalpur Dev. Block under PHE. Dte. Junior Engineer, Burdwan Division ORD/000697/2025-2026 1037/AE/HQ 01/08/2025 30 A.R. TRADERS 0.97 0.00 0 0
3301 PURBA BARDHAMAN Jamalpur Burdwan Division GROUND WATER BASED SELIMABAD PIPED WATER SUPPLY SCHEME JAMALPUR BLOCK PURBA BARDHAMAN , SM/11492 New Continuation work for Supply of one no. Diesel / LPG / CNG driven Motor Cab / Maxi Cab (Air Condition) on hire basis for the office of the Executive Engineer, Burdwan Division, P.H.E. Dte. to be used by the Assistant Engineer, Headquarters, P.H.E. Dte. [Period from 01.12.2025 to 31.01.2026] Contractual Junior Engineer ORD/000802/2025-2026 1282/AE/HQ 01/12/2025 62 SK. ASRAFUDDIN 0.80 0.00 0 0
3302 PURBA BARDHAMAN Jamalpur Burdwan Division GROUND WATER BASED SELIMABAD PIPED WATER SUPPLY SCHEME JAMALPUR BLOCK PURBA BARDHAMAN , SM/11492 New Continuation work for Supply of one no. Diesel / LPG / CNG driven Motor Cab / Maxi Cab (Air Condition) on hire basis for the office of the Executive Engineer, Burdwan Division, P.H.E. Dte. to be used by the Assistant Engineer, Headquarters, P.H.E. Dte. [Period from 01.08.2025 to 30.09.2025] AE(HQs), Burdwan Division, PHE Dte. Contractual Junior Engineer ORD/000529/2025-2026 1036/AE/HQ 01/08/2025 61 SK. ASRAFUDDIN 0.80 0.00 0 0
3303 PURBA BARDHAMAN Jamalpur Burdwan Division GROUND WATER BASED SELIMABAD PIPED WATER SUPPLY SCHEME JAMALPUR BLOCK PURBA BARDHAMAN , SM/11492 New Continuation work for Supply of one no. Diesel / LPG / CNG driven Motor Cab / Maxi Cab (Air Condition) on hire basis for the office of the Executive Engineer, Burdwan Division, P.H.E. Dte. to be used by the Assistant Engineer, Headquarters, P.H.E. Dte. [Period from 01.10.2025 to 30.11.2025] AE(HQs), Burdwan Division, PHE Dte. Contractual Junior Engineer ORD/000702/2025-2026 1196/AE/HQ 24/09/2025 61 SK. ASRAFUDDIN 0.80 0.00 0 0
3304 PURBA BARDHAMAN Jamalpur Central Mechanical GROUND WATER BASED SELIMABAD PIPED WATER SUPPLY SCHEME JAMALPUR BLOCK PURBA BARDHAMAN , SM/11492 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-3 at Selimabad Water Supply Scheme [ Block- Jamalpur ] under CMD, PHE Dte., Dist.- Purba-Bardhaman ASSISTANT ENGINEER Junior Engineer ORD/000615/2022-2023 3119/CMD 23/11/2022 740 MITRA ENTERPRISE 10.73 7.58 70.64 98
3305 PURBA BARDHAMAN Burdwan Division Providing Water Supply Arrangement by Sinking of Tube Well at left out Primary Schools(250 nos) for 100% School Coverage in Purba Bardhaman within Katwa Sub Division under Burdwan Division P.H.E. DTE. , SM/11514 School Material Requisition To Resource Division RTOR000048/2022-2023 5400/BWD 12/12/2022 0 Resource Division 105.18 0.00 0 0
3306 PURBA BARDHAMAN Burdwan Division Providing Water Supply Arrangement by Sinking of Tube Well at left out Primary Schools(250 nos) for 100% School Coverage in Purba Bardhaman within Katwa Sub Division under Burdwan Division P.H.E. DTE. , SM/11514 School Sinking of 100mtr. deep 100 × 40mm tubewell for providing water supply arrangement in Schools under Ketugram - II Block (09 Nos School) within Purba Bardhaman District under Burdwan Division, PHE Dte. Assistant Engineer ORD/000362/2022-2023 3807/BWD 02/09/2022 30 M/S STANDARD CONSTRUCTION 9.76 7.37 75.51 0
3307 PURBA BARDHAMAN Burdwan Division Providing Water Supply Arrangement by Sinking of Tube Well at left out Primary Schools(250 nos) for 100% School Coverage in Purba Bardhaman within Katwa Sub Division under Burdwan Division P.H.E. DTE. , SM/11514 School Sinking of 100mtr. deep 100 × 40mm tubewell for providing water supply arrangement in Schools under Katwa I Block (35 Nos School) within Purba Bardhaman District under Burdwan Division, PHE Dte.(Part-A). Assistant Engineer ORD/000280/2022-2023 3587/BWD 17/08/2022 45 HAMID SK 38.97 33.15 85.07 0
3308 PURBA BARDHAMAN Burdwan Division Providing Water Supply Arrangement by Sinking of Tube Well at left out Primary Schools(250 nos) for 100% School Coverage in Purba Bardhaman within Katwa Sub Division under Burdwan Division P.H.E. DTE. , SM/11514 School Sinking of 100mtr. deep 100 × 40mm tubewell for providing water supply arrangement in Schools under Katwa I Block (35 Nos School) within Purba Bardhaman District under Burdwan Division, PHE Dte.(Part B). Assistant Engineer ORD/000305/2022-2023 3635/BWD 23/08/2022 45 JAI MAA DURGA & CO. 39.46 36.01 91.26 0
3309 PURBA BARDHAMAN Burdwan Division Providing Water Supply Arrangement by Sinking of Tube Well at left out Primary Schools(250 nos) for 100% School Coverage in Purba Bardhaman within Katwa Sub Division under Burdwan Division P.H.E. DTE. , SM/11514 School Sinking of 100mtr. deep 100 × 40mm tubewell for providing water supply arrangement in Schools under Ketugram - I Block (33 Nos School) within Purba Bardhaman District under Burdwan Division, PHE Dte. (Part-A). Assistant Engineer ORD/000266/2022-2023 3514/BWD 12/08/2022 45 JAHAR GHOSH 36.83 33.55 91.09 100
3310 PURBA BARDHAMAN Burdwan Division Providing Water Supply Arrangement by Sinking of Tube Well at left out Primary Schools(250 nos) for 100% School Coverage in Purba Bardhaman within Katwa Sub Division under Burdwan Division P.H.E. DTE. , SM/11514 School Sinking of 100mtr. deep 100 × 40mm tubewell for providing water supply arrangement in Schools under Mongalkote Block (39 Nos School) within Purba Bardhaman District under Burdwan Division, PHE Dte.(Part-A). Assistant Engineer JUNIOR ENGINEER R.W.S. BURDWAN SUB-DIVISION PHE DTE ORD/000267/2022-2023 3515/BWD 12/08/2022 45 NANGTASWAR CO. OP. LABOUR CONT. AND CONSTRUCTION SOCIETY LTD. 43.97 39.72 90.33 100
3311 PURBA BARDHAMAN Burdwan Division Providing Water Supply Arrangement by Sinking of Tube Well at left out Primary Schools(250 nos) for 100% School Coverage in Purba Bardhaman within Katwa Sub Division under Burdwan Division P.H.E. DTE. , SM/11514 School Sinking of 100mtr. deep 100 × 40mm tubewell for providing water supply arrangement in Schools under Mongalkote Block (39 Nos School) within Purba Bardhaman District under Burdwan Division, PHE Dte.(Part-B). Assistant Engineer JUNIOR ENGINEER R.W.S. BURDWAN SUB-DIVISION PHE DTE ORD/000268/2022-2023 3516/BWD 12/08/2022 45 S.S. CONSTRUCTION 43.97 39.18 89.11 100
3312 PURBA BARDHAMAN Burdwan Division Providing Water Supply Arrangement by Sinking of Tube Well at left out Primary Schools(250 nos) for 100% School Coverage in Purba Bardhaman within Katwa Sub Division under Burdwan Division P.H.E. DTE. , SM/11514 School Sinking of 100mtr. deep 100 × 40mm tubewell for providing water supply arrangement in Schools under Ketugram - I Block (33 Nos School) within Purba Bardhaman District under Burdwan Division, PHE Dte. (Part-B)._2ND CALL. Assistant Engineer ORD/000278/2022-2023 3586/BWD 17/08/2022 45 ANIRUDDHA FARUQUE 35.94 34.06 94.77 0
3313 PURBA BARDHAMAN Burdwan Division Providing Water Supply Arrangement by Sinking of Tube Well at left out Primary Schools(250 nos) for 100% School Coverage in Purba Bardhaman within Katwa Sub Division under Burdwan Division P.H.E. DTE. , SM/11514 School Sinking of 100mtr. deep 100 × 40mm tubewell for providing water supply arrangement in Schools under Katwa ? II Block (27 Nos School) within Purba Bardhaman District under Burdwan Division, PHE Dte. Assistant Engineer ORD/000277/2022-2023 3526/BWD 12/08/2022 45 KHEPIMA ENGINEERS CO. OPERATIVE SOCIETY LTD. 30.20 24.50 81.13 0
3314 PURBA BARDHAMAN Burdwan Division Providing Water Supply Arrangement by Sinking of Tube Well at left out Primary Schools(250 nos) for 100% School Coverage in Purba Bardhaman within Katwa Sub Division under Burdwan Division P.H.E. DTE. , SM/11514 School Material Requisition To Resource Division RTOR000024/2022-2023 3301/BWD 29/07/2022 0 Resource Division 32.50 0.00 0 0
3315 PURBA BARDHAMAN Burdwan Division Providing Water Supply Arrangement by Sinking of Tube Well at leftout Primary Schools(359 nos) for 100% School Coverage in Purba Bardhaman within Burdwan South Sub Division under Burdwan Division P.H.E. DTE. , SM/11285 School Material Requisition To Resource Division RTOR000051/2022-2023 5399/BWD 12/12/2022 0 Resource Division 85.00 0.00 0 0
3316 PURBA BARDHAMAN Burdwan Division Providing Water Supply Arrangement by Sinking of Tube Well at leftout Primary Schools(359 nos) for 100% School Coverage in Purba Bardhaman within Burdwan South Sub Division under Burdwan Division P.H.E. DTE. , SM/11285 School Sinking of 100mtr. deep 100 × 40mm tubewell for providing water supply arrangement in Schools under Raina II Block (39 Nos School) within Purba Bardhaman District under Burdwan Division, PHE Dte. (Part-B). Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000301/2022-2023 3634/BWD 23/08/2022 45 PREMANANDA ROY BISWAS 43.83 41.05 93.66 0
3317 PURBA BARDHAMAN Burdwan Division Providing Water Supply Arrangement by Sinking of Tube Well at leftout Primary Schools(359 nos) for 100% School Coverage in Purba Bardhaman within Burdwan South Sub Division under Burdwan Division P.H.E. DTE. , SM/11285 School Sinking of 100mtr. deep 100 × 40mm tubewell for providing water supply arrangement in Schools under Memari ¿ I Block (17 Nos School) within Purba Bardhaman District under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000191/2022-2023 3415/BWD 05/08/2022 30 DIPAYAN DEY 17.85 14.90 83.47 100
3318 PURBA BARDHAMAN Burdwan Division Providing Water Supply Arrangement by Sinking of Tube Well at leftout Primary Schools(359 nos) for 100% School Coverage in Purba Bardhaman within Burdwan South Sub Division under Burdwan Division P.H.E. DTE. , SM/11285 School Sinking of 100mtr. deep 100 × 40mm tubewell for providing water supply arrangement in Schools under Raina I Block (34 Nos School) within Purba Bardhaman District under Burdwan Division, PHE Dte. (Part-A)_2ND CALL. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000329/2022-2023 3673/BWD 29/08/2022 45 MOTI RAHAMAN 37.97 27.67 72.87 0
3319 PURBA BARDHAMAN Burdwan Division Providing Water Supply Arrangement by Sinking of Tube Well at leftout Primary Schools(359 nos) for 100% School Coverage in Purba Bardhaman within Burdwan South Sub Division under Burdwan Division P.H.E. DTE. , SM/11285 School Sinking of 100mtr. deep 100 × 40mm tubewell for providing water supply arrangement in Schools under Burdwan-I Block (37 Nos School) within Purba Bardhaman District under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000196/2022-2023 3419/BWD 05/08/2022 45 P.C. CONSTRUCTION 41.51 35.48 85.47 0
3320 PURBA BARDHAMAN Burdwan Division Providing Water Supply Arrangement by Sinking of Tube Well at leftout Primary Schools(359 nos) for 100% School Coverage in Purba Bardhaman within Burdwan South Sub Division under Burdwan Division P.H.E. DTE. , SM/11285 School Sinking of 100mtr. deep 100 × 40mm tubewell for providing water supply arrangement in Schools under Khandaghosh Block (43 Nos School) within Purba Bardhaman District under Burdwan Division, PHE Dte. (Part-A). Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000343/2022-2023 3690/BWD 29/08/2022 45 SHUBHRA KANTI GHOSH 48.43 42.33 87.4 0
3321 PURBA BARDHAMAN Burdwan Division Providing Water Supply Arrangement by Sinking of Tube Well at leftout Primary Schools(359 nos) for 100% School Coverage in Purba Bardhaman within Burdwan South Sub Division under Burdwan Division P.H.E. DTE. , SM/11285 School Sinking of 100mtr. deep 100 × 40mm tubewell for providing water supply arrangement in Schools under Khandaghosh Block (43 Nos School) within Purba Bardhaman District under Burdwan Division, PHE Dte. (Part-B). Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000302/2022-2023 3666/BWD 29/08/2022 45 M/S LOKE NIRMAN 48.38 29.13 60.21 100
3322 PURBA BARDHAMAN Burdwan Division Providing Water Supply Arrangement by Sinking of Tube Well at leftout Primary Schools(359 nos) for 100% School Coverage in Purba Bardhaman within Burdwan South Sub Division under Burdwan Division P.H.E. DTE. , SM/11285 School Sinking of 100mtr. deep 100 × 40mm tubewell for providing water supply arrangement in Schools under Raina ¿ II Block (34 Nos School) within Purba Bardhaman District under Burdwan Division, PHE Dte. (Part-A). Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000281/2022-2023 3612/BWD 18/08/2022 45 HAFIJUR RAHAMAN MIDYA 43.97 26.45 60.15 0
3323 PURBA BARDHAMAN Burdwan Division Providing Water Supply Arrangement by Sinking of Tube Well at leftout Primary Schools(359 nos) for 100% School Coverage in Purba Bardhaman within Burdwan South Sub Division under Burdwan Division P.H.E. DTE. , SM/11285 School Sinking of 100mtr. deep 100 × 40mm tubewell for providing water supply arrangement in Schools under Jamalpur Block (05 Nos School) within Purba Bardhaman District under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000279/2022-2023 3588/BWD 17/08/2022 15 UDYOG CONSTRUCTION 4.72 4.41 93.43 0
3324 PURBA BARDHAMAN Burdwan Division Providing Water Supply Arrangement by Sinking of Tube Well at leftout Primary Schools(359 nos) for 100% School Coverage in Purba Bardhaman within Burdwan South Sub Division under Burdwan Division P.H.E. DTE. , SM/11285 School Sinking of 100mtr. deep 100 × 40mm tubewell for providing water supply arrangement in Schools under Raina I Block (33 Nos School) within Purba Bardhaman District under Burdwan Division, PHE Dte. (Part-B). Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000193/2022-2023 3416/BWD 05/08/2022 45 THREE MAA ENTERPRISE 36.46 30.34 83.21 0
3325 PURBA BARDHAMAN Burdwan Division Providing Water Supply Arrangement by Sinking of Tube Well at leftout Primary Schools(359 nos) for 100% School Coverage in Purba Bardhaman within Burdwan South Sub Division under Burdwan Division P.H.E. DTE. , SM/11285 School Sinking of 100mtr. deep 100 × 40mm tubewell for providing water supply arrangement in Schools under Burdwan-II Block (28 Nos School) within Purba Bardhaman District under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000195/2022-2023 3414/BWD 05/08/2022 45 G.S. CONSTRUCTION & CO. 31.49 27.19 86.34 0
3326 PURBA BARDHAMAN Burdwan Division Providing Water Supply Arrangement by Sinking of Tube Well at leftout Primary Schools(359 nos) for 100% School Coverage in Purba Bardhaman within Burdwan South Sub Division under Burdwan Division P.H.E. DTE. , SM/11285 School Sinking of 100mtr. deep 100 × 40mm tubewell for providing water supply arrangement in Schools under Memari II Block (41 Nos School) within Purba Bardhaman District under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000300/2022-2023 3636/BWD 23/08/2022 45 BRINDABAN KONAR 46.23 34.63 74.91 100
3327 PURBA BARDHAMAN Burdwan Division Providing Water Supply Arrangement by Sinking of Tube Well at leftout Primary Schools(359 nos) for 100% School Coverage in Purba Bardhaman within Burdwan South Sub Division under Burdwan Division P.H.E. DTE. , SM/11285 School Material Requisition To Resource Division RTOR000023/2022-2023 3298/BWD 29/07/2022 0 Resource Division 90.49 0.00 0 0
3328 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED DEWANDIGHI MIRJAPUR PWSS TO ACCOMMODATE FHTC IN BURDWAN-I BLOCK UNDER BURDWAN SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/09494 Augmentation Route Survey & Preparation of DPR for Dewandighi-Mirzapur W/S Scheme under Burdwan-I Block under Burdwan Sub-Division under Burdwan Division PHE Dte. Sl No.5. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000493/2021-2022 180/BSD 31/01/2022 30 RADIANT 2.51 2.50 99.6 1
3329 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED DEWANDIGHI MIRJAPUR PWSS TO ACCOMMODATE FHTC IN BURDWAN-I BLOCK UNDER BURDWAN SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/09494 Augmentation Supply of materials for different water supply scheme under Burdwan Division, PHE Dte. VCH/001578/2021-2022 1207/DW 10/03/2022 0 EXECUTIVE ENGINEER, RESOURCES DIVISION, P.H.E. DTE. 3,005.00 0.00 0 0
3330 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED DEWANDIGHI MIRJAPUR PWSS TO ACCOMMODATE FHTC IN BURDWAN-I BLOCK UNDER BURDWAN SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/09494 Augmentation Supply and delivery of different dia. CIDF sluice valve for Augmentation of Paharhati, Nababhat, Shyamsundar & Dewandighi-Mirzapur Piped Water Supply Scheme within Burdwan Sub-Division under Burdwan Division, P.H.E. Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000519/2022-2023 4703/BWD 19/10/2022 20 SSPR VALVE MANUFACTURING PVT LTD. 14.45 3.61 24.98 1
3331 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED DEWANDIGHI MIRJAPUR PWSS TO ACCOMMODATE FHTC IN BURDWAN-I BLOCK UNDER BURDWAN SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/09494 Augmentation Allied work for Augmentation of DEWANDIGHI PWSS under Burdwan-I Block of Burdwan Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000744/2022-2023 1168/BWD 14/03/2023 45 BOSE ENTERPRISE 50.01 46.23 92.44 100
3332 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED DEWANDIGHI MIRJAPUR PWSS TO ACCOMMODATE FHTC IN BURDWAN-I BLOCK UNDER BURDWAN SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/09494 Augmentation Material Requisition To Resource Division RTOR000056/2021-2022 560/BWD 27/01/2022 0 Resource Division 11.04 0.00 0 0
3333 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED DEWANDIGHI MIRJAPUR PWSS TO ACCOMMODATE FHTC IN BURDWAN-I BLOCK UNDER BURDWAN SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/09494 Augmentation Material Requisition To Resource Division RTOR000215/2021-2022 1538/BWD 15/03/2022 0 Resource Division 0.37 0.00 0 0
3334 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED DEWANDIGHI MIRJAPUR PWSS TO ACCOMMODATE FHTC IN BURDWAN-I BLOCK UNDER BURDWAN SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/09494 Augmentation Material Requisition To Resource Division RTOR000087/2021-2022 881/BWD 11/02/2022 0 Resource Division 13.26 0.00 0 0
3335 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED DEWANDIGHI MIRJAPUR PWSS TO ACCOMMODATE FHTC IN BURDWAN-I BLOCK UNDER BURDWAN SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/09494 Augmentation Augmentation of DEWANDIGHI Piped Water Supply Scheme with LDS, FHTC, Rising main with necessary interconnection, Construction of 200 cum capacity OHR with 20.0 mtr. Staging height inclusive of soil investigation under Burdwan-I Block, District:- Purba-Burdwan. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. Junior Engineer, Burdwan Sadar Sub-Division ORD/000026/2022-2023 2055/BWD 19/04/2022 365 SHREE J.M. CONSTRUCTION 213.62 190.06 88.97 100
3336 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED DEWANDIGHI MIRJAPUR PWSS TO ACCOMMODATE FHTC IN BURDWAN-I BLOCK UNDER BURDWAN SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/09494 Augmentation Balance Work for extension of pipe lines to provide FHTC With Sinking of Tub well , Construction of pump house with Boundary wall & other related work for TALIT-SIMDAL (SM/18112), NABABHAT (SM-15166) and DEWANDIGHI-MIRJAPUR (SM/09494) PWSS under Burdwan Sub-Div., Block -Bwn-1, under Burdwan Division PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/001248/2024-2025 793/BWD 03/03/2025 120 M/S S.S. ENTERPRISE 227.66 0.00 0 0
3337 PURBA BARDHAMAN Bhatar Burdwan Division KHURUL PIPED WATER SUPPLY SCHEME , SM/13549 New Material Requisition To Resource Division RTOR000386/2023-2024 2197/BWD 12/05/2023 0 Resource Division 6.52 0.00 0 0
3338 PURBA BARDHAMAN Bhatar Burdwan Division KHURUL PIPED WATER SUPPLY SCHEME , SM/13549 New Material Requisition To Resource Division RTOR000606/2023-2024 4911/BWD 10/11/2023 0 Resource Division 32.92 0.00 0 0
3339 PURBA BARDHAMAN Bhatar Burdwan Division KHURUL PIPED WATER SUPPLY SCHEME , SM/13549 New Material Requisition To Resource Division RTOR000003/2023-2024 1962/BWD 25/04/2023 0 Resource Division 23.91 0.00 0 0
3340 PURBA BARDHAMAN Bhatar Central Mechanical KHURUL PIPED WATER SUPPLY SCHEME , SM/13549 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Karjana & others water supply scheme under Bhatar Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000067/2024-2025 2394/CMD 02/08/2024 90 AHALYA ENGINEERING WORKS 82.00 0.00 0 0
3341 PURBA BARDHAMAN Bhatar Central Mechanical KHURUL PIPED WATER SUPPLY SCHEME , SM/13549 New NEW SERVICE CONNECTION FOR KHURUL PIPED WATER SUPPLY SCHEME. BILL/02832/2023-2024 BP-2023-24-589 04/03/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.45 0.00 0 0
3342 PURBA BARDHAMAN Bhatar Central Mechanical KHURUL PIPED WATER SUPPLY SCHEME , SM/13549 New NEW SERVICE CONNECTION FOR KHURUL PIPED WATER SUPPLY SCHEME. BILL/02831/2023-2024 BP-2023-24-588 04/03/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.72 0.00 0 0
3343 PURBA BARDHAMAN Bhatar Central Mechanical KHURUL PIPED WATER SUPPLY SCHEME , SM/13549 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at KHURUL Water Supply Scheme [ Block- BHATAR ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000803/2023-2024 4089/CMD 29/08/2023 30 M/S, S.S. ENTERPRISE. 27.79 10.74 38.65 60
3344 PURBA BARDHAMAN Khandaghosh Burdwan Division GUIR PIPED WATER SUPPLY SCHEME IN KHANDOGHOSH BLOCK , SM/13424 New Material Requisition To Resource Division RTOR000073/2023-2024 1962/BWD 25/04/2023 0 Resource Division 3.93 0.00 0 0
3345 PURBA BARDHAMAN Khandaghosh Burdwan Division GUIR PIPED WATER SUPPLY SCHEME IN KHANDOGHOSH BLOCK , SM/13424 New Material Requisition To Resource Division RTOR000175/2023-2024 2155/BWD 10/05/2023 0 Resource Division 13.07 0.00 0 0
3346 PURBA BARDHAMAN Khandaghosh Burdwan Division GUIR PIPED WATER SUPPLY SCHEME IN KHANDOGHOSH BLOCK , SM/13424 New Material Requisition To Resource Division RTOR000716/2023-2024 5268/BWD 30/11/2023 0 Resource Division 21.07 0.00 0 0
3347 PURBA BARDHAMAN Khandaghosh Central Mechanical GUIR PIPED WATER SUPPLY SCHEME IN KHANDOGHOSH BLOCK , SM/13424 New New service connection charges for Guir PWSS TW 1 BILL/00817/2023-2024 BP-2023-24-96 02/08/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 4.97 0.00 0 0
3348 PURBA BARDHAMAN Khandaghosh Central Mechanical GUIR PIPED WATER SUPPLY SCHEME IN KHANDOGHOSH BLOCK , SM/13424 New New service connection charges for Guir PWSS TW-2 BILL/00799/2023-2024 BP-2023-24-84 26/07/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 5.96 0.00 0 0
3349 PURBA BARDHAMAN Khandaghosh Burdwan Division GUIR PIPED WATER SUPPLY SCHEME IN KHANDOGHOSH BLOCK , SM/13424 New GUIR Piped Water Supply Scheme with sinking of Tube-well, LDS, Rising Main, FHTC, Construction of 300 cum capacity RCC OHR with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drain and internal pathway at different TW site under Khandaghosh Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer1, Durgapur Sub-Division, PHE Dte.,Junior Engineer2, Durgapur Sub-Division, PHE Dte. ORD/000018/2023-2024 1732/BWD 13/04/2023 629 UNIQUE AGENCY 531.21 464.78 87.49 40
3350 PURBA BARDHAMAN Khandaghosh Central Mechanical GUIR PIPED WATER SUPPLY SCHEME IN KHANDOGHOSH BLOCK , SM/13424 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at BICHKHARA & others water supply scheme under Khandoghosh Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman ASSISTANT ENGINEER Junior Engineer ORD/000064/2024-2025 2390/CMD 02/08/2024 90 MS DAS ELECTRIC CO 46.54 0.00 0 0
3351 PURBA BARDHAMAN Khandaghosh Burdwan Division GUIR PIPED WATER SUPPLY SCHEME IN KHANDOGHOSH BLOCK , SM/13424 New Supply of Inspection Vehicle for inspection of different JJM related (Schemes) works as and when required including supply of driver & fuel (minimum 8 Hours duty per day) and all taxes etc. for Durgapur Sub-Division under Burdwan Division, P.H.E. Dte.consider 96.00 Km. run per day [Period February'2024 to April'2024] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer2, Durgapur Sub-Division, PHE Dte. ORD/001233/2023-2024 91/DSD 31/01/2024 78 MD HASIN 1.00 0.29 29 0
3352 PURBA BARDHAMAN Khandaghosh Burdwan Division GUIR PIPED WATER SUPPLY SCHEME IN KHANDOGHOSH BLOCK , SM/13424 New Continuation for the work of Supply of Inspection Vehicle for inspection of different JJM related (Schemes) works as and when required including supply of driver & fuel (minimum 8 Hours duty per day) and all taxes etc. for Durgapur Sub-Division under BurdwanDivision, P.H.E. Dte.consider 96.00 Km. run per day [Period May'2024 to July'2024] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000255/2024-2025 369/DSD 30/04/2024 78 MD HASIN 1.00 0.31 31 0
3353 PURBA BARDHAMAN Khandaghosh Burdwan Division GUIR PIPED WATER SUPPLY SCHEME IN KHANDOGHOSH BLOCK , SM/13424 New Balance work for providing Functional Household Tap Connection (FHTC) within the command area KHEJURHATI & GUIR W/S. Scheme of Khandaghosh Block under Burdwan Division, PHE. Dte. Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/001217/2024-2025 724/BWD 24/02/2025 120 ROY CONSTRUCTION 153.99 0.00 0 0
3354 PURBA BARDHAMAN Memari-II Burdwan Division NOAHATI PIPED WATER SUPPLY SCHEME , SM/13452 New Material Requisition To Resource Division RTOR000073/2022-2023 1247/BWD 17/03/2023 0 Resource Division 11.94 0.00 0 0
3355 PURBA BARDHAMAN Memari-II Burdwan Division NOAHATI PIPED WATER SUPPLY SCHEME , SM/13452 New Material Requisition To Resource Division RTOR000465/2023-2024 3989/BWD 08/09/2023 0 Resource Division 2.90 0.00 0 0
3356 PURBA BARDHAMAN Memari-II Burdwan Division NOAHATI PIPED WATER SUPPLY SCHEME , SM/13452 New Material Requisition To Resource Division RTOR000683/2023-2024 5056/BWD 23/11/2023 0 Resource Division 20.46 0.00 0 0
3357 PURBA BARDHAMAN Memari-II Central Mechanical NOAHATI PIPED WATER SUPPLY SCHEME , SM/13452 New New service connection charges for Noahati PWSS TW-1 BILL/00770/2023-2024 BP-2023-24-74 21/07/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 4.87 0.00 0 0
3358 PURBA BARDHAMAN Memari-II Central Mechanical NOAHATI PIPED WATER SUPPLY SCHEME , SM/13452 New New service connection charges for Noahati PWSS TW-2 BILL/00771/2023-2024 BP-2023-24-75 21/07/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.17 0.00 0 0
3359 PURBA BARDHAMAN Memari-II Burdwan Division NOAHATI PIPED WATER SUPPLY SCHEME , SM/13452 New Different works related (sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of different capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site) to KUCHUT & NOAHATI Piped Water Supply Scheme under Memari - II Block, District:- Purba Bardhaman [NEW SCHEME] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000750/2022-2023 1172/BWD 14/03/2023 1113 NATIONAL CONSTRUCTION 831.75 388.50 46.71 99
3360 PURBA BARDHAMAN Memari-II Central Mechanical NOAHATI PIPED WATER SUPPLY SCHEME , SM/13452 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at NOAHATI & others water supply scheme under Memari-II Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. ASSISTANT ENGINEER Junior Engineer ORD/000102/2024-2025 2395/CMD 02/08/2024 90 S.G. TECHNICAL SERVICES 36.99 0.00 0 0
3361 PURBA BARDHAMAN Memari-II Central Mechanical NOAHATI PIPED WATER SUPPLY SCHEME , SM/13452 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at Noahati Water Supply Scheme [ Block- Memari-2 ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER Junior Engineer ORD/000138/2023-2024 2819/CMD 04/07/2023 30 M/S. S.R. ENTERPRISE 29.40 24.17 82.21 100
3362 PURBA BARDHAMAN Memari-II Burdwan Division NOAHATI PIPED WATER SUPPLY SCHEME , SM/13452 New Different Types of work involved in connection with different New Schemes (05 Nos.) Piped Water Supply Scheme under Memari II Block within Burdwan Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000003/2025-2026 1116/BWD 03/04/2025 120 SOFIQUL ISLAM 176.89 0.00 0 0
3363 PURBA BARDHAMAN Manteswar Burdwan Division GROUND WATER SUPPLY BASED PIPED WATER SUPPLY SCHEME FOR PIPLON PWSS IN MANTESHWAR BLOCK OF PURBA BURDWAN DISTRICT UNDER BURDWAN DIVISION, P.H.E. DTE. , SM/13283 New Material Requisition To Resource Division RTOR000370/2023-2024 2197/BWD 12/05/2023 0 Resource Division 6.18 0.00 0 0
3364 PURBA BARDHAMAN Manteswar Burdwan Division GROUND WATER SUPPLY BASED PIPED WATER SUPPLY SCHEME FOR PIPLON PWSS IN MANTESHWAR BLOCK OF PURBA BURDWAN DISTRICT UNDER BURDWAN DIVISION, P.H.E. DTE. , SM/13283 New Material Requisition To Resource Division RTOR000543/2023-2024 4310/BWD 29/09/2023 0 Resource Division 85.20 0.00 0 0
3365 PURBA BARDHAMAN Manteswar Central Mechanical GROUND WATER SUPPLY BASED PIPED WATER SUPPLY SCHEME FOR PIPLON PWSS IN MANTESHWAR BLOCK OF PURBA BURDWAN DISTRICT UNDER BURDWAN DIVISION, P.H.E. DTE. , SM/13283 New NEW SERVICE CONNECTION FOR PIPLON PWSS TW -3. BILL/03100/2023-2024 BP-2023-24-640 15/03/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 4.25 0.00 0 0
3366 PURBA BARDHAMAN Manteswar Central Mechanical GROUND WATER SUPPLY BASED PIPED WATER SUPPLY SCHEME FOR PIPLON PWSS IN MANTESHWAR BLOCK OF PURBA BURDWAN DISTRICT UNDER BURDWAN DIVISION, P.H.E. DTE. , SM/13283 New Quotation for new service connection for Piplon PWSS PH-2. BILL/00283/2024-2025 BP-2024-25-143 11/06/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 5.73 0.00 0 0
3367 PURBA BARDHAMAN Manteswar Central Mechanical GROUND WATER SUPPLY BASED PIPED WATER SUPPLY SCHEME FOR PIPLON PWSS IN MANTESHWAR BLOCK OF PURBA BURDWAN DISTRICT UNDER BURDWAN DIVISION, P.H.E. DTE. , SM/13283 New NEW SERVICE CONNECTION FOR PIPLON PWSS. BILL/02688/2023-2024 BP-2023-24-563 23/02/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 7.15 0.00 0 0
3368 PURBA BARDHAMAN Manteswar Central Mechanical GROUND WATER SUPPLY BASED PIPED WATER SUPPLY SCHEME FOR PIPLON PWSS IN MANTESHWAR BLOCK OF PURBA BURDWAN DISTRICT UNDER BURDWAN DIVISION, P.H.E. DTE. , SM/13283 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1, 2 & 3 at PIPLON Water Supply Scheme [ Block- MONTESWAR ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000793/2023-2024 4081/CMD 29/08/2023 30 SUNRISE ENGINEERING CORPORATION 44.42 0.00 0 94
3369 PURBA BARDHAMAN Manteswar Burdwan Division GROUND WATER SUPPLY BASED PIPED WATER SUPPLY SCHEME FOR PIPLON PWSS IN MANTESHWAR BLOCK OF PURBA BURDWAN DISTRICT UNDER BURDWAN DIVISION, P.H.E. DTE. , SM/13283 New Different works related (sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of different capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site) to BELENDA, JAMNA, PIPLON & PARGUNA Piped Water Supply Scheme under Manteswar Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer1, Durgapur Sub-Division, PHE Dte. ORD/000689/2023-2024 4388/BWD 05/10/2023 667 AKASH CONSTRUCTION 2,296.40 228.41 9.95 50
3370 PURBA BARDHAMAN Manteswar Central Mechanical GROUND WATER SUPPLY BASED PIPED WATER SUPPLY SCHEME FOR PIPLON PWSS IN MANTESHWAR BLOCK OF PURBA BURDWAN DISTRICT UNDER BURDWAN DIVISION, P.H.E. DTE. , SM/13283 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Sutra & others water supply scheme under Monteswar Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000068/2024-2025 2396/CMD 02/08/2024 455 SINHA ELECTRICALS 78.06 0.00 0 20
3371 PURBA BARDHAMAN Raina-II Burdwan Division GROUND WATER BASED CHAK BATASPURR SINGLE VILLAGE PIPED WATER SUPPPLY SCHEME , SM/13495 New Material Requisition To Resource Division RTOR000240/2023-2024 2197/BWD 12/05/2023 0 Resource Division 7.00 0.00 0 0
3372 PURBA BARDHAMAN Raina-II Burdwan Division GROUND WATER BASED CHAK BATASPURR SINGLE VILLAGE PIPED WATER SUPPPLY SCHEME , SM/13495 New Material Requisition To Resource Division RTOR000526/2023-2024 4315/BWD 29/09/2023 0 Resource Division 0.83 0.00 0 0
3373 PURBA BARDHAMAN Raina-II Burdwan Division GROUND WATER BASED CHAK BATASPURR SINGLE VILLAGE PIPED WATER SUPPPLY SCHEME , SM/13495 New Material Requisition To Resource Division RTOR000659/2023-2024 5117/BWD 23/11/2023 0 Resource Division 18.94 0.00 0 0
3374 PURBA BARDHAMAN Raina-II Central Mechanical GROUND WATER BASED CHAK BATASPURR SINGLE VILLAGE PIPED WATER SUPPPLY SCHEME , SM/13495 New New service connection charges for Chak Baraspur PWSS TW-1 BILL/00884/2023-2024 BP-2023-24-107 09/08/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.19 0.00 0 0
3375 PURBA BARDHAMAN Raina-II Burdwan Division GROUND WATER BASED CHAK BATASPURR SINGLE VILLAGE PIPED WATER SUPPPLY SCHEME , SM/13495 New Beautification of PWSS with Arboriculture, Recharge Pit including shaft and approach footway to Pump-House. Facelifting of masonary works at ANGUNA-BATASPUR (Raina-I Block) P.W.S.S under Burdwan Division, PHE Dte. ASSISTANT ENGINEER R.W.S. BURDWAN SUB-DIVISION PHE DTE JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000361/2024-2025 230/RWS 25/07/2024 10 DAS ENTERPRISE 0.97 0.00 0 0
3376 PURBA BARDHAMAN Raina-II Central Mechanical GROUND WATER BASED CHAK BATASPURR SINGLE VILLAGE PIPED WATER SUPPPLY SCHEME , SM/13495 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Satinandi,Sanko & others water supply scheme under Galsi-1 Block ; Serpur, Uchalan & others water supply scheme under Raina-2 Block and maro, loapur & others water supply scheme under Galsi-2 block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000397/2024-2025 2751/CMD 24/09/2024 90 ORIENTAL ENGINEERING CO. 88.42 0.00 0 0
3377 PURBA BARDHAMAN Raina-II Burdwan Division GROUND WATER BASED CHAK BATASPURR SINGLE VILLAGE PIPED WATER SUPPPLY SCHEME , SM/13495 New Beautification of PWSS with Arboriculture at Chak Bataspur and Recharge Pit including shaft & anciliary works at Head Works site and Repair and colour at 2nd Tubewell site of Kaity (Raina-II Block) P.W.S.S under Burdwan Division, PHE Dte. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000366/2024-2025 236/RWS 30/07/2024 10 ANWESHA CONSTRUCTION 0.97 0.00 0 0
3378 PURBA BARDHAMAN Raina-II Burdwan Division GROUND WATER BASED CHAK BATASPURR SINGLE VILLAGE PIPED WATER SUPPPLY SCHEME , SM/13495 New CHAK BATASPUR Single Village Scheme with sinking of Tube-well, LDS, Rising Main, FHTC & construction of switch rooms & boundary walls with gates and land development, drain and internal pathway at different TW site under Raina-II Block, District:- Purba-Bardhaman [NEW SCHEME]. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000085/2023-2024 2115/BWD 10/05/2023 90 ANWESHA CONSTRUCTION 63.63 63.63 100 100
3379 PURBA BARDHAMAN Raina-II Central Mechanical GROUND WATER BASED CHAK BATASPURR SINGLE VILLAGE PIPED WATER SUPPPLY SCHEME , SM/13495 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at CHAK BATASPUR Water Supply Scheme [ Block-RAINA-2] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000165/2023-2024 2930/CMD 12/07/2023 232 CONCORD ENGINEERING 28.98 11.46 39.54 40
3380 PURBA BARDHAMAN Manteswar Burdwan Division SIGHNALI PIPED WATER SUPPLY SCHEME. , SM/13496 New Material Requisition To Resource Division RTOR000453/2023-2024 3977/BWD 08/09/2023 0 Resource Division 38.31 0.00 0 0
3381 PURBA BARDHAMAN Manteswar Burdwan Division SIGHNALI PIPED WATER SUPPLY SCHEME. , SM/13496 New Material Requisition To Resource Division RTOR000321/2023-2024 2197/BWD 12/05/2023 0 Resource Division 15.55 0.00 0 0
3382 PURBA BARDHAMAN Manteswar Central Mechanical SIGHNALI PIPED WATER SUPPLY SCHEME. , SM/13496 New New service connection for SIGHNALI PWSS TW 1. BILL/02445/2023-2024 BP-2023-24-519 09/02/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.24 0.00 0 0
3383 PURBA BARDHAMAN Manteswar Central Mechanical SIGHNALI PIPED WATER SUPPLY SCHEME. , SM/13496 New NEW SERVICE CONNECTION FOR SIGHNALI PWSS. BILL/02692/2023-2024 BP-2023-24-571 27/02/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 9.01 0.00 0 0
3384 PURBA BARDHAMAN Manteswar Burdwan Division SIGHNALI PIPED WATER SUPPLY SCHEME. , SM/13496 New Different works related (sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of different capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site) to PASCHIM KHARAMPUR, SHUSHNA & SIGHNALI Piped Water Supply Scheme under Manteswar Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer1, Durgapur Sub-Division, PHE Dte. ORD/000482/2023-2024 3494/BWD 09/08/2023 783 S.P. CONSTRUCTION 1,925.07 362.27 18.82 80
3385 PURBA BARDHAMAN Manteswar Central Mechanical SIGHNALI PIPED WATER SUPPLY SCHEME. , SM/13496 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Sutra & others water supply scheme under Monteswar Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000068/2024-2025 2396/CMD 02/08/2024 455 SINHA ELECTRICALS 78.06 0.00 0 20
3386 PURBA BARDHAMAN Purbasthali-I Burdwan Division KARAIL PIPED WATER SUPPLY SCHEME , SM/13498 New Material Requisition To Resource Division RTOR000310/2023-2024 2197/BWD 12/05/2023 0 Resource Division 19.71 0.00 0 0
3387 PURBA BARDHAMAN Purbasthali-I Burdwan Division KARAIL PIPED WATER SUPPLY SCHEME , SM/13498 New Land demarcation and preparation of sketch map for Haldi, Sultanpur, Berugram & Karail Piped W/S. Scheme (New Scheme) at different Blocks under JJM under Burdwan Division, PHE Dte. AE(HQs) J.E. 1 BURDWAN ORD/000756/2023-2024 842/AE/HQ 01/11/2023 15 M/S S. CHOUDHURY 0.33 0.00 0 100
3388 PURBA BARDHAMAN Purbasthali-I Burdwan Division KARAIL PIPED WATER SUPPLY SCHEME , SM/13498 New KARAIL Piped Water Supply Scheme with sinking of Tube-well, LDS, Rising Main, FHTC with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drain and internal pathway at different TW site under Purbasthali-I Block, District:- Purba-Bardhaman [NEW SCHEME]. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/001010/2023-2024 345/BWD 25/01/2024 120 T.K. BANERJEE & CO. 59.45 5.72 9.62 30
3389 PURBA BARDHAMAN Purbasthali-I Central Mechanical KARAIL PIPED WATER SUPPLY SCHEME , SM/13498 New Quotation for new service connection at Karail PH-1 PWSS BILL/00811/2024-2025 BP-2024-25-307 24/09/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 9.51 0.00 0 0
3390 PURBA BARDHAMAN Purbasthali-I Central Mechanical KARAIL PIPED WATER SUPPLY SCHEME , SM/13498 New Supply & Installation of Submersible Pumping Machinery , Voltage Stabilizer, Chlorination system and internal House wiring for Tube well no.- 1 & 2 at KARAIL Water Supply Scheme [Block - PURBASTHALI-1] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000827/2023-2024 4104/CMD 29/08/2023 30 PADMA ENGINEERING CO. 20.80 0.00 0 60
3391 PURBA BARDHAMAN Purbasthali-I Central Mechanical KARAIL PIPED WATER SUPPLY SCHEME , SM/13498 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Haripur & others water supply scheme under purbasthali 1 Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000072/2024-2025 2397/CMD 02/08/2024 90 CHATTERJEE ENTERPRISE 48.60 0.00 0 30
3392 PURBA BARDHAMAN Purbasthali-I Burdwan Division BAGPUR PIPED WATER SUPPLY SCHEME , SM/13323 New Material Requisition To Resource Division RTOR000216/2023-2024 2155/BWD 10/05/2023 0 Resource Division 11.24 0.00 0 0
3393 PURBA BARDHAMAN Purbasthali-I Burdwan Division BAGPUR PIPED WATER SUPPLY SCHEME , SM/13323 New Material Requisition To Resource Division RTOR000474/2023-2024 3998/BWD 08/09/2023 0 Resource Division 0.83 0.00 0 0
3394 PURBA BARDHAMAN Purbasthali-I Burdwan Division BAGPUR PIPED WATER SUPPLY SCHEME , SM/13323 New Different types of works in connection with implementation of MIRGAHAR Piped Water Supply Scheme (SM/18365) & BAGPUR PWSS (SM/13323) under Kalna Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000186/2024-2025 2400/BWD 26/06/2024 120 M/S S. CHOUDHURY 301.24 0.00 0 60
3395 PURBA BARDHAMAN Purbasthali-I Burdwan Division BAGPUR PIPED WATER SUPPLY SCHEME , SM/13323 New Material Requisition To Resource Division RTOR000796/2023-2024 313/BWD 24/01/2024 0 Resource Division 17.19 0.00 0 0
3396 PURBA BARDHAMAN Purbasthali-I Central Mechanical BAGPUR PIPED WATER SUPPLY SCHEME , SM/13323 New New service connection for BAGPUR PWSS TW-2. BILL/02398/2023-2024 BP-2023-24-499 06/02/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 4.09 0.00 0 0
3397 PURBA BARDHAMAN Purbasthali-I Central Mechanical BAGPUR PIPED WATER SUPPLY SCHEME , SM/13323 New Quotation for new service connection at Bogpur PWSS PH-1 BILL/00389/2024-2025 BP-2024-25-202 18/07/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 5.20 0.00 0 0
3398 PURBA BARDHAMAN Purbasthali-I Burdwan Division BAGPUR PIPED WATER SUPPLY SCHEME , SM/13323 New Different works related (sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of different capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site) to MANGANPUR & BAGPUR Piped Water Supply Scheme under Purbasthali-I Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000391/2023-2024 3200/BWD 24/07/2023 1100 M/S GHOSH & CO. 711.81 30.11 4.23 10
3399 PURBA BARDHAMAN Purbasthali-I Central Mechanical BAGPUR PIPED WATER SUPPLY SCHEME , SM/13323 New Supply & Installation of Submersible Pumping Machinery , Voltage Stabilizer, Chlorination system and internal House wiring for Tube well no.- 1 & 2 at BAGPUR Water Supply Scheme [Block-PURBASTHALI-1] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/001273/2023-2024 16/CMD 03/01/2024 30 BARMAN ROY TRADERS 21.77 0.00 0 45
3400 PURBA BARDHAMAN Purbasthali-I Central Mechanical BAGPUR PIPED WATER SUPPLY SCHEME , SM/13323 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Haripur & others water supply scheme under purbasthali 1 Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000072/2024-2025 2397/CMD 02/08/2024 90 CHATTERJEE ENTERPRISE 48.60 0.00 0 30
3401 PURBA BARDHAMAN Raina-II Burdwan Division UCHALAN PIPED WATER SUPPLY SCHEME , SM/13329 New Material Requisition To Resource Division RTOR000331/2023-2024 2197/BWD 12/05/2023 0 Resource Division 11.85 0.00 0 0
3402 PURBA BARDHAMAN Raina-II Burdwan Division UCHALAN PIPED WATER SUPPLY SCHEME , SM/13329 New Material Requisition To Resource Division RTOR000478/2023-2024 4002/BWD 08/09/2023 0 Resource Division 11.88 0.00 0 0
3403 PURBA BARDHAMAN Raina-II Burdwan Division UCHALAN PIPED WATER SUPPLY SCHEME , SM/13329 New Material Requisition To Resource Division RTOR000160/2023-2024 2155/BWD 10/05/2023 0 Resource Division 2.75 0.00 0 0
3404 PURBA BARDHAMAN Raina-II Burdwan Division UCHALAN PIPED WATER SUPPLY SCHEME , SM/13329 New Material Requisition To Resource Division RTOR000697/2023-2024 5067/BWD 23/11/2023 0 Resource Division 20.46 0.00 0 0
3405 PURBA BARDHAMAN Raina-II Central Mechanical UCHALAN PIPED WATER SUPPLY SCHEME , SM/13329 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at Uchalan Water Supply Scheme [ Block- Raina-2 ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000910/2023-2024 4174/CMD 29/08/2023 30 M/S, S.DAS AND ENTERPRISE. 29.71 12.37 41.64 50
3406 PURBA BARDHAMAN Raina-II Burdwan Division UCHALAN PIPED WATER SUPPLY SCHEME , SM/13329 New Continuation Work Order supply of inspection Vehicle for inspection of different JJM related(schemes)works as and when required including supply of driver & fuel(minimum 8 hours duty per day) and all taxes etc. for Burdwan Sub-Division under Burdwan Division,PHE Dte consider 96.00 Km. run per day (Period from 01-11-2023 to 31-01-2024) ORD/000985/2023-2024 2561/BSD 30/10/2023 66 MD HASIN 0.85 0.00 0 0
3407 PURBA BARDHAMAN Raina-II Central Mechanical UCHALAN PIPED WATER SUPPLY SCHEME , SM/13329 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Satinandi,Sanko & others water supply scheme under Galsi-1 Block ; Serpur, Uchalan & others water supply scheme under Raina-2 Block and maro, loapur & others water supply scheme under Galsi-2 block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000397/2024-2025 2751/CMD 24/09/2024 90 ORIENTAL ENGINEERING CO. 88.42 0.00 0 0
3408 PURBA BARDHAMAN Raina-II Central Mechanical UCHALAN PIPED WATER SUPPLY SCHEME , SM/13329 New New Service connection for Uchalan W/S Scheme PH No.-1 BILL/01794/2023-2024 BP-2023-24-299 30/12/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 4.13 0.00 0 0
3409 PURBA BARDHAMAN Raina-II Central Mechanical UCHALAN PIPED WATER SUPPLY SCHEME , SM/13329 New New electric connection for Uchalan PWSS, PH-2. BILL/01882/2023-2024 BP-2023-24-341 11/01/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.50 0.00 0 0
3410 PURBA BARDHAMAN Raina-II Burdwan Division UCHALAN PIPED WATER SUPPLY SCHEME , SM/13329 New Different works related (sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of different capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site) to UCHALAN, CHAK CHANDAN, SERPUR & KATNABIL Piped Water Supply Scheme under Raina II Block, District:- Purba Bardhaman [NEW SCHEME] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000367/2023-2024 3076/BWD 18/07/2023 806 SK ALIM 1,307.56 219.13 16.76 75
3411 PURBA BARDHAMAN Raina-II Burdwan Division UCHALAN PIPED WATER SUPPLY SCHEME , SM/13329 New Continuation Work Order for supply of inspection Vehicle for inspection of different JJM related (schemes)works as and when required including supply of driver & fuel(minimum 8 hours duty per day) and all taxes etc. for Burdwan Sub-Division under Burdwan Division,PHE Dte consider 96.00 Km. run per day (Period from 01-08-2024 to 31-10-2024) JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000557/2024-2025 1500/BSD 30/07/2024 66 PARVIN BEGAM 0.85 0.21 24.71 100
3412 PURBA BARDHAMAN Raina-II Burdwan Division UCHALAN PIPED WATER SUPPLY SCHEME , SM/13329 New Continuation Work Order for Supply of one No.Diesel Driven Ambassador Car No. WB:41H-4009 on hire basis for the office of the Assistant Engineer,Burdwan Sub-Division,PHE Dte (Period from 01-06-2025 to 31.08.2025) JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000180/2025-2026 1260/BSD 30/05/2025 92 SK. ASFIA 1.20 0.00 0 60
3413 PURBA BARDHAMAN Mangolkote Central Mechanical GOBARDHANPUR PIPED WATER SUPPLY SCHEME , SM/14445 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at GOBARDHANPUR Water Supply Scheme [ Block- MONGOLKOTE] under CMD, PHE Dte., Dist.- Purba-Bardhaman. [3rd CALL] Driller In-Charge Junior Engineer ORD/000933/2023-2024 4196/CMD 29/08/2023 30 M/S, S.S. ENTERPRISE. 29.71 0.00 0 0
3414 PURBA BARDHAMAN Mangolkote Burdwan Division GOBARDHANPUR PIPED WATER SUPPLY SCHEME , SM/14445 New Material Requisition To Resource Division RTOR000112/2023-2024 1965/BWD 26/04/2023 0 Resource Division 17.79 0.00 0 0
3415 PURBA BARDHAMAN Mangolkote Burdwan Division GOBARDHANPUR PIPED WATER SUPPLY SCHEME , SM/14445 New Material Requisition To Resource Division RTOR000385/2023-2024 2197/BWD 12/05/2023 0 Resource Division 13.53 0.00 0 0
3416 PURBA BARDHAMAN Mangolkote Burdwan Division GOBARDHANPUR PIPED WATER SUPPLY SCHEME , SM/14445 New Material Requisition To Resource Division RTOR000714/2023-2024 5277/BWD 30/11/2023 0 Resource Division 20.37 0.00 0 0
3417 PURBA BARDHAMAN Mangolkote Central Mechanical GOBARDHANPUR PIPED WATER SUPPLY SCHEME , SM/14445 New Quotation for new service connection at Gobardhanpur PWSS TW-1 BILL/01087/2024-2025 BP-2024-25-397 22/11/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.93 0.00 0 0
3418 PURBA BARDHAMAN Mangolkote Central Mechanical GOBARDHANPUR PIPED WATER SUPPLY SCHEME , SM/14445 New Quotation for new service connection for Gobardhanpur PWSS TW-2. BILL/00252/2024-2025 BP-2024-25-131 05/06/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 7.11 0.00 0 0
3419 PURBA BARDHAMAN Mangolkote Burdwan Division GOBARDHANPUR PIPED WATER SUPPLY SCHEME , SM/14445 New Different works related (sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of different capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site) to DEULIA, GOBARDHANPUR, KHARIJA-KASHIGRAM & UNIATATARPUR Piped Water Supply Scheme under Mangolkote Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer JUNIOR ENGINEER KATWA SUB-DIVISION PHE DTE ORD/000477/2023-2024 3491/BWD 09/08/2023 815 POWER TOOLS & ENGINEERING 1,741.05 0.00 0 10
3420 PURBA BARDHAMAN Mangolkote Central Mechanical GOBARDHANPUR PIPED WATER SUPPLY SCHEME , SM/14445 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Lakshimpur & others water supply scheme under Mangalkote Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman Driller In-Charge Junior Engineer ORD/000097/2024-2025 2406/CMD 02/08/2024 290 CHOUDHURY ENTERPRISE 57.65 0.00 0 10
3421 PURBA BARDHAMAN Mangolkote Burdwan Division GOBARDHANPUR PIPED WATER SUPPLY SCHEME , SM/14445 New Designing, making and erection of Sign Board for SWAJAL GRAM in Taharpur village of Memari-I Block under Gobindapur Piped Water Supply Scheme within Burdwan Sub-Division under Burdwan Division, PHE Dte(5 nos Board) ORD/000508/2025-2026 2352/BSD 21/08/2025 10 RAJ-N-MAHARAJ MANPOWER & SECURITY SOLUTIONS 0.72 0.00 0 0
3422 PURBA BARDHAMAN Bhatar Burdwan Division CHHATINI PIPED WATER SUPPLY SCHEME , SM/14017 New Material Requisition To Resource Division RTOR000074/2023-2024 1962/BWD 25/04/2023 0 Resource Division 56.53 0.00 0 0
3423 PURBA BARDHAMAN Bhatar Burdwan Division CHHATINI PIPED WATER SUPPLY SCHEME , SM/14017 New Material Requisition To Resource Division RTOR000311/2023-2024 2197/BWD 12/05/2023 0 Resource Division 19.47 0.00 0 0
3424 PURBA BARDHAMAN Bhatar Burdwan Division CHHATINI PIPED WATER SUPPLY SCHEME , SM/14017 New Material Requisition To Resource Division RTOR000584/2023-2024 4928/BWD 10/11/2023 0 Resource Division 34.57 0.00 0 0
3425 PURBA BARDHAMAN Bhatar Central Mechanical CHHATINI PIPED WATER SUPPLY SCHEME , SM/14017 New New service connection charges for Chhatini PWSS TW-1 BILL/01049/2023-2024 BP-2023-24-118 16/08/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 2.96 0.00 0 0
3426 PURBA BARDHAMAN Bhatar Central Mechanical CHHATINI PIPED WATER SUPPLY SCHEME , SM/14017 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Karjana & others water supply scheme under Bhatar Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000067/2024-2025 2394/CMD 02/08/2024 90 AHALYA ENGINEERING WORKS 82.00 0.00 0 0
3427 PURBA BARDHAMAN Bhatar Central Mechanical CHHATINI PIPED WATER SUPPLY SCHEME , SM/14017 New New Service connection at CHHATINI PWSS TW-2. BILL/02368/2023-2024 BP-2023-24-480 31/01/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.24 0.00 0 0
3428 PURBA BARDHAMAN Bhatar Burdwan Division CHHATINI PIPED WATER SUPPLY SCHEME , SM/14017 New CHHATINI Piped Water Supply Scheme with sinking of Tube-well, LDS, Rising Main, FHTC, Construction of 400 cum capacity RCC OHR with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drain and internal pathway at different TW site under Bhatar Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer2, Durgapur Sub-Division, PHE Dte. ORD/000093/2023-2024 2216/BWD 15/05/2023 687 SHWET BARANI 539.35 124.11 23.01 55
3429 PURBA BARDHAMAN Bhatar Central Mechanical CHHATINI PIPED WATER SUPPLY SCHEME , SM/14017 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at Chhatini Water Supply Scheme [ Block- Bhatar ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000212/2023-2024 3069/CMD 21/07/2023 30 SUNRISE ENGINEERING CORPORATION 27.79 0.00 0 60
3430 PURBA BARDHAMAN Bhatar Burdwan Division CHHATINI PIPED WATER SUPPLY SCHEME , SM/14017 New Supply of Inspection Vehicle for inspection of different JJM related (Schemes) works as and when required including supply of driver & fuel (minimum 8 Hours duty per day) and all taxes etc. for Durgapur Sub-Division under Burdwan Division, P.H.E. Dte.consider 96.00 Km. run per day [Period February'2024 to April'2024] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer2, Durgapur Sub-Division, PHE Dte. ORD/001233/2023-2024 91/DSD 31/01/2024 78 MD HASIN 1.00 0.29 29 0
3431 PURBA BARDHAMAN Bhatar Burdwan Division CHHATINI PIPED WATER SUPPLY SCHEME , SM/14017 New Providing Functional Household Tap Connection (FHTC) by sinking of tube well 250 x 150 mm. dia., Constn. of Pump House & Boundary Wall within command area of CHHATINI W/S. Scheme, Bhatar Block under Burdwan Division, PHE. Dte. Assistant Engineer, Durgapur Sub Division, P.H.E. Dte JUNIOR ENGINEER DURGAPUR SUB-DIVISION PHE DTE,Junior Engineer2, Durgapur Sub-Division, PHE Dte. ORD/000401/2024-2025 3033/BWD 06/08/2024 120 SAHA CONSTRUCTION & CO. 129.06 0.00 0 50
3432 PURBA BARDHAMAN Bhatar Burdwan Division CHHATINI PIPED WATER SUPPLY SCHEME , SM/14017 New Continuation for the work of Supply of Inspection Vehicle for inspection of different JJM related (Schemes) works as and when required including supply of driver & fuel (minimum 8 Hours duty per day) and all taxes etc. for Durgapur Sub-Division under BurdwanDivision, P.H.E. Dte.consider 96.00 Km. run per day [Period May'2024 to July'2024] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000255/2024-2025 369/DSD 30/04/2024 78 MD HASIN 1.00 0.33 33 0
3433 PURBA BARDHAMAN Katwa-II Burdwan Division MULGRAM PIPED WATER SUPPLY SCHEME , SM/14058 New Material Requisition To Resource Division RTOR000092/2022-2023 1630/BWD 06/04/2023 0 Resource Division 1.65 0.00 0 0
3434 PURBA BARDHAMAN Katwa-II Burdwan Division MULGRAM PIPED WATER SUPPLY SCHEME , SM/14058 New Material Requisition To Resource Division RTOR000057/2022-2023 1236/BWD 17/03/2023 0 Resource Division 13.55 0.00 0 0
3435 PURBA BARDHAMAN Katwa-II Burdwan Division MULGRAM PIPED WATER SUPPLY SCHEME , SM/14058 New Material Requisition To Resource Division RTOR000637/2023-2024 5092/BWD 23/11/2023 0 Resource Division 24.47 0.00 0 0
3436 PURBA BARDHAMAN Katwa-II Central Mechanical MULGRAM PIPED WATER SUPPLY SCHEME , SM/14058 New New service connection charges for Mulgram W/S Scheme TW-1 BILL/00695/2023-2024 BP-2023-24-37 27/06/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 4.76 0.00 0 0
3437 PURBA BARDHAMAN Katwa-II Burdwan Division MULGRAM PIPED WATER SUPPLY SCHEME , SM/14058 New MULGRAM Piped Water Supply Scheme with sinking of Tube-well, LDS, Rising Main, FHTC, Construction of 300 cum capacity RCC OHR with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drain and internal pathway at different TW site under KATWA -II Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer JUNIOR ENGINEER KATWA SUB-DIVISION PHE DTE ORD/000685/2022-2023 482/BWD 08/02/2023 365 RADIANT 475.42 465.16 97.84 98
3438 PURBA BARDHAMAN Katwa-II Burdwan Division MULGRAM PIPED WATER SUPPLY SCHEME , SM/14058 New Balance work of OHR, construction Concrete Road, Functional Household Tap Connection, Road restoration etc. for Mulgram PWSS, under KATWA -II Block under Katwa Sub-Division under Burdwan Division, PHED, District:- Purba-Bardhaman. Assistant Engineer ORD/000502/2024-2025 3157/BWD 22/08/2024 90 RADIANT 66.62 0.00 0 0
3439 PURBA BARDHAMAN Katwa-II Central Mechanical MULGRAM PIPED WATER SUPPLY SCHEME , SM/14058 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Mulgram & others water supply scheme under Katwa-II Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. ASSISTANT ENGINEER Junior Engineer ORD/000070/2024-2025 2409/CMD 02/08/2024 90 DUTTA ENTERPRISE 50.18 0.00 0 0
3440 PURBA BARDHAMAN Katwa-II Central Mechanical MULGRAM PIPED WATER SUPPLY SCHEME , SM/14058 New Supply and installation of Electro-Magnetic flow meter at AURIA, KARUI & others water supply scheme under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. Driller In-Charge JUNIOR ENGINEER ORD/000602/2024-2025 3106/CMD 11/12/2024 60 S.K. ELECTRICALS 13.60 0.00 0 0
3441 PURBA BARDHAMAN Katwa-II Central Mechanical MULGRAM PIPED WATER SUPPLY SCHEME , SM/14058 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at Mulgram Water Supply Scheme [ Block- KATWA-2 ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. Driller In-Charge Junior Engineer ORD/000049/2023-2024 2511/CMD 02/06/2023 30 M/S. S.R. ENTERPRISE 28.96 22.84 78.87 40
3442 PURBA BARDHAMAN Katwa-II Central Mechanical MULGRAM PIPED WATER SUPPLY SCHEME , SM/14058 New New service connection charges for Mulgram PWSS TW-2 BILL/01763/2023-2024 BP-2023-24-273 21/12/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 4.26 0.00 0 0
3443 PURBA BARDHAMAN Khandaghosh Burdwan Division SARANGA PIPED WATER SUPPLY SCHEME , SM/14078 New Material Requisition To Resource Division RTOR000108/2023-2024 1965/BWD 26/04/2023 0 Resource Division 7.15 0.00 0 0
3444 PURBA BARDHAMAN Khandaghosh Burdwan Division SARANGA PIPED WATER SUPPLY SCHEME , SM/14078 New Material Requisition To Resource Division RTOR000733/2023-2024 5235/BWD 30/11/2023 0 Resource Division 21.07 0.00 0 0
3445 PURBA BARDHAMAN Khandaghosh Burdwan Division SARANGA PIPED WATER SUPPLY SCHEME , SM/14078 New Material Requisition To Resource Division RTOR000196/2023-2024 2155/BWD 10/05/2023 0 Resource Division 5.01 0.00 0 0
3446 PURBA BARDHAMAN Khandaghosh Central Mechanical SARANGA PIPED WATER SUPPLY SCHEME , SM/14078 New New service connection charges for Saranga PWSS TW-2 BILL/00800/2023-2024 BP-2023-24-87 26/07/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 4.97 0.00 0 0
3447 PURBA BARDHAMAN Khandaghosh Central Mechanical SARANGA PIPED WATER SUPPLY SCHEME , SM/14078 New New service connection charges for Saranga PWSS TW-1 BILL/00818/2023-2024 BP-2023-24-94 02/08/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 6.50 0.00 0 0
3448 PURBA BARDHAMAN Khandaghosh Central Mechanical SARANGA PIPED WATER SUPPLY SCHEME , SM/14078 New Continuation order-Hiring of Inspection Vehicle (Diesel/CNG/LPG Driven ) for supervision of site for the office of the Assistant Engineer,under CMD,PHE,Dte. [W.e.f-01/03/2024 to 29/04/2024) ASSISTANT ENGINEER Junior Engineer ORD/001914/2023-2024 359/CMSD 27/02/2024 60 SUBRATA BHADRA 0.79 0.79 100 100
3449 PURBA BARDHAMAN Khandaghosh Central Mechanical SARANGA PIPED WATER SUPPLY SCHEME , SM/14078 New Supply & delivery of submersible pumping machinery (for urgent FHTC) for Tube well no.-1 at Saranga w/s scheme, (Block -Khandaghosh) under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER Junior Engineer ORD/001663/2023-2024 1075/CMSD 15/12/2023 12 SUBHRA ENTERPRISE 0.67 0.67 100 100
3450 PURBA BARDHAMAN Khandaghosh Central Mechanical SARANGA PIPED WATER SUPPLY SCHEME , SM/14078 New Supply & delivery of different electro-mechanical accessories (for urgent FHTC) for Tube well no.-1 at Saranga w/s scheme, ( Block -Khandaghosh) under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER Junior Engineer ORD/001664/2023-2024 1073/CMSD 15/12/2023 10 SUBHRA ENTERPRISE 0.80 0.77 96.25 100
3451 PURBA BARDHAMAN Khandaghosh Central Mechanical SARANGA PIPED WATER SUPPLY SCHEME , SM/14078 New Emergency Installation (for urgent FHTC) of departmental supply submersible pumping machinery with supply main switch, cable, starter etc. for Tube well no.-1 at Saranga w/s scheme, ( Block -Khandaghosh) under CMD, PHE Dte., Dist.- Purba-Bardhaman ASSISTANT ENGINEER Junior Engineer ORD/001666/2023-2024 06/CMSD 02/01/2024 10 SUBHRA ENTERPRISE 0.72 0.68 94.44 100
3452 PURBA BARDHAMAN Khandaghosh Burdwan Division SARANGA PIPED WATER SUPPLY SCHEME , SM/14078 New Different works related (sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of different capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site) to SARANGA & KAMALPUR Piped Water Supply Scheme under Khandaghosh Block, District:- Purba Bardhaman [NEW SCHEME] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer1, Durgapur Sub-Division, PHE Dte.,Junior Engineer2, Durgapur Sub-Division, PHE Dte. ORD/000082/2023-2024 2078/BWD 04/05/2023 698 KHAN ENTERPRISE 820.73 249.61 30.41 42
3453 PURBA BARDHAMAN Khandaghosh Central Mechanical SARANGA PIPED WATER SUPPLY SCHEME , SM/14078 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at Saranga Water Supply Scheme [ Block- Khandoghosh ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER Junior Engineer ORD/000144/2023-2024 2854/CMD 05/07/2023 30 ORIENTAL ENGINEERING CO. 28.97 22.55 77.84 100
3454 PURBA BARDHAMAN Khandaghosh Burdwan Division SARANGA PIPED WATER SUPPLY SCHEME , SM/14078 New Balance work for providing Functional Household Tap Connection (FHTC) within command area SARANGA W/S. Scheme of Khandaghosh Block under Burdwan Divn., PHE. Dte. Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer1, Durgapur Sub-Division, PHE Dte. ORD/001097/2024-2025 431/BWD 20/01/2025 120 ANWESHA CONSTRUCTION 98.39 0.00 0 0
3455 PURBA BARDHAMAN Khandaghosh Central Mechanical SARANGA PIPED WATER SUPPLY SCHEME , SM/14078 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at KHEJURHATI & others water supply scheme under Khandoghosh Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman ASSISTANT ENGINEER Junior Engineer ORD/000071/2024-2025 2391/CMD 02/08/2024 90 C.M. ENTERPRISE 45.81 0.00 0 10
3456 PURBA BARDHAMAN Katwa-II Burdwan Division BARA KULGACHHI PIPED WATER SUPPLY SCHEME , SM/14079 New Material Requisition To Resource Division RTOR000089/2023-2024 1962/BWD 25/04/2023 0 Resource Division 20.38 0.00 0 0
3457 PURBA BARDHAMAN Katwa-II Burdwan Division BARA KULGACHHI PIPED WATER SUPPLY SCHEME , SM/14079 New Material Requisition To Resource Division RTOR000134/2023-2024 2155/BWD 10/05/2023 0 Resource Division 9.61 0.00 0 0
3458 PURBA BARDHAMAN Katwa-II Central Mechanical BARA KULGACHHI PIPED WATER SUPPLY SCHEME , SM/14079 New New service connection charges for Barakulgachi PWSS TW-2 BILL/00882/2023-2024 BP-2023-24-108 09/08/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 5.73 0.00 0 0
3459 PURBA BARDHAMAN Katwa-II Central Mechanical BARA KULGACHHI PIPED WATER SUPPLY SCHEME , SM/14079 New New service connection charges for Bara Kulgachi PWSS TW-1 BILL/01353/2023-2024 BP-2023-24-131 22/08/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.92 0.00 0 0
3460 PURBA BARDHAMAN Katwa-II Burdwan Division BARA KULGACHHI PIPED WATER SUPPLY SCHEME , SM/14079 New BARA KULGACHHI Piped Water Supply Scheme with sinking of Tube-well, LDS, Rising Main, FHTC, Construction of 300 cum capacity RCC OHR with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drain and internal pathway at different TW site under KATWA -II Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer JUNIOR ENGINEER KATWA SUB-DIVISION PHE DTE ORD/000709/2022-2023 775/BWD 24/02/2023 677 MANASH GHOSH 557.58 468.82 84.08 73
3461 PURBA BARDHAMAN Katwa-II Central Mechanical BARA KULGACHHI PIPED WATER SUPPLY SCHEME , SM/14079 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Mulgram & others water supply scheme under Katwa-II Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. ASSISTANT ENGINEER Junior Engineer ORD/000070/2024-2025 2409/CMD 02/08/2024 90 DUTTA ENTERPRISE 50.18 0.00 0 0
3462 PURBA BARDHAMAN Katwa-II Central Mechanical BARA KULGACHHI PIPED WATER SUPPLY SCHEME , SM/14079 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at BARAKULGACHHI Water Supply Scheme [ Block- KATWA-2] under CMD, PHE Dte., Dist.- Purba-Bardhaman. Driller In-Charge Junior Engineer ORD/000234/2023-2024 3173/CMD 26/07/2023 30 GOENKA ENTERPRISE 28.98 22.70 78.33 90
3463 PURBA BARDHAMAN Katwa-II Burdwan Division BARA KULGACHHI PIPED WATER SUPPLY SCHEME , SM/14079 New Supply, delivery, installation & hand hold demonstration of different equipments / machineries to test HDPE pipes as per IS: 4984-2016 at the pipe testing laboratory at Nababhat under Burdwan Division, PHE. Dte._2ND CALL AE(HQs) J.E. 1 BURDWAN ORD/001212/2023-2024 907/BWD 04/03/2024 30 MANASH GHOSH 23.87 3.83 16.05 100
3464 PURBA BARDHAMAN Katwa-II Burdwan Division BARA KULGACHHI PIPED WATER SUPPLY SCHEME , SM/14079 New Material Requisition To Resource Division RTOR000792/2023-2024 331/BWD 24/01/2024 0 Resource Division 16.79 0.00 0 0
3465 PURBA BARDHAMAN Burdwan-II Burdwan Division Samanti Piped Water Supply Scheme , SM/13319 New Supply & delivery of different dia. MJ Coller for FHTC as well as smooth running of different W/S. Schemes under Burdwan Division, P.H.E. Dte. [i.e. (1) Magra PWSS, Memari-I Block, (2) Kuchut PWSS, Memari - II Block, (3) Khundkuri PWSS, Khandaghosh Block & (4) Samanti PWSS, Burdwan - II Block)] ORD/000653/2023-2024 4076/BWD 13/09/2023 20 SSPR VALVE MANUFACTURING PVT LTD. 20.63 5.00 24.24 100
3466 PURBA BARDHAMAN Burdwan-II Burdwan Division Samanti Piped Water Supply Scheme , SM/13319 New Material Requisition To Resource Division RTOR000015/2023-2024 1962/BWD 25/04/2023 0 Resource Division 10.45 0.00 0 0
3467 PURBA BARDHAMAN Burdwan-II Burdwan Division Samanti Piped Water Supply Scheme , SM/13319 New Material Requisition To Resource Division RTOR000170/2023-2024 2155/BWD 10/05/2023 0 Resource Division 23.19 0.00 0 0
3468 PURBA BARDHAMAN Burdwan-II Burdwan Division Samanti Piped Water Supply Scheme , SM/13319 New Material Requisition To Resource Division RTOR000732/2023-2024 5237/BWD 30/11/2023 0 Resource Division 21.07 0.00 0 0
3469 PURBA BARDHAMAN Burdwan-II Central Mechanical Samanti Piped Water Supply Scheme , SM/13319 New New service connection charges for Samanti PWSS TW-1 BILL/00886/2023-2024 BP-2023-24-112 10/08/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 4.10 0.00 0 0
3470 PURBA BARDHAMAN Burdwan-II Central Mechanical Samanti Piped Water Supply Scheme , SM/13319 New New service connection for Samanti W/S scheme TW No-2 BILL/02273/2023-2024 BP-2023-24-411 19/01/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 6.60 0.00 0 0
3471 PURBA BARDHAMAN Burdwan-II Burdwan Division Samanti Piped Water Supply Scheme , SM/13319 New Restoration of hard shouldering and flank damaged during laying of PHE pipeline at Samanti village road from 0.00 Kmp to 3.00 Kmp within Samanti PWSS. BILL/00138/2024-2025 226/JJM 14/05/2024 0 EXECUTIVE ENGINEER-I, BURDWAN DIVISION, P.W.D. 5.08 0.00 0 0
3472 PURBA BARDHAMAN Burdwan-II Burdwan Division Samanti Piped Water Supply Scheme , SM/13319 New SAMANTI Piped Water Supply Scheme with sinking of Tube-well, LDS, Rising Main, FHTC, Construction of 250 cum capacity RCC OHR with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drain and internal pathway at different TW site under BARDHAMAN-II Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. Junior Engineer, Burdwan Sadar Sub-Division ORD/000802/2022-2023 1536/BWD 29/03/2023 1008 G.B. CONSTRUCTION & CO. 504.69 304.41 60.32 36
3473 PURBA BARDHAMAN Burdwan-II Central Mechanical Samanti Piped Water Supply Scheme , SM/13319 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at KUSHA & others water supply scheme under Bardhaman-II Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman ASSISTANT ENGINEER Junior Engineer ORD/000065/2024-2025 2389/CMD 02/08/2024 90 DILIP MAHATO 53.14 0.00 0 12
3474 PURBA BARDHAMAN Bhatar Burdwan Division RAMCHANDRAPUR PIPED WATER SUPPLY SCHEME , SM/14909 New Material Requisition To Resource Division RTOR000085/2023-2024 1962/BWD 25/04/2023 0 Resource Division 6.74 0.00 0 0
3475 PURBA BARDHAMAN Bhatar Burdwan Division RAMCHANDRAPUR PIPED WATER SUPPLY SCHEME , SM/14909 New Material Requisition To Resource Division RTOR000270/2023-2024 2197/BWD 12/05/2023 0 Resource Division 7.32 0.00 0 0
3476 PURBA BARDHAMAN Bhatar Burdwan Division RAMCHANDRAPUR PIPED WATER SUPPLY SCHEME , SM/14909 New Material Requisition To Resource Division RTOR000557/2023-2024 4890/BWD 10/11/2023 0 Resource Division 10.17 0.00 0 0
3477 PURBA BARDHAMAN Bhatar Central Mechanical RAMCHANDRAPUR PIPED WATER SUPPLY SCHEME , SM/14909 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Karjana & others water supply scheme under Bhatar Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000067/2024-2025 2394/CMD 02/08/2024 90 AHALYA ENGINEERING WORKS 82.00 0.00 0 0
3478 PURBA BARDHAMAN Bhatar Central Mechanical RAMCHANDRAPUR PIPED WATER SUPPLY SCHEME , SM/14909 New Quotation for new service connection for Ramchandrapur Zone-2 PWSS PH 1. BILL/00226/2024-2025 BP-2024-25-117 28/05/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 4.39 0.00 0 0
3479 PURBA BARDHAMAN Bhatar Central Mechanical RAMCHANDRAPUR PIPED WATER SUPPLY SCHEME , SM/14909 New NEW SERVICE CONNECTION FOR RAMCHANDRAPUR ZONE - I PWSS BILL/02593/2023-2024 BP-2023-24-551 20/02/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 4.15 0.00 0 0
3480 PURBA BARDHAMAN Bhatar Central Mechanical RAMCHANDRAPUR PIPED WATER SUPPLY SCHEME , SM/14909 New Quotation for new service connection for Ramchandarapur Zone-2 PWSS PH 2. BILL/00227/2024-2025 BP-2024-25-118 29/05/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 6.35 0.00 0 0
3481 PURBA BARDHAMAN Bhatar Central Mechanical RAMCHANDRAPUR PIPED WATER SUPPLY SCHEME , SM/14909 New Quotation for new service connection at Ramchandrapur Zone-1 PWSS PH-2 BILL/00392/2024-2025 BP-2024-25-205 18/07/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 5.44 0.00 0 0
3482 PURBA BARDHAMAN Bhatar Burdwan Division RAMCHANDRAPUR PIPED WATER SUPPLY SCHEME , SM/14909 New RAMCHANDRAPUR (ZONE-I & II ) Piped Water Supply Scheme with sinking of Tube-well, LDS, Rising Main, FHTC, Construction of RCC OHR with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drain and internal pathway at different TW site under Bhatar Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer1, Durgapur Sub-Division, PHE Dte.,Junior Engineer2, Durgapur Sub-Division, PHE Dte. ORD/000536/2023-2024 3703/BWD 24/08/2023 677 SUPRITI ENTERPRISE 582.13 0.00 0 60
3483 PURBA BARDHAMAN Bhatar Central Mechanical RAMCHANDRAPUR PIPED WATER SUPPLY SCHEME , SM/14909 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1, 2, 3 & 4 at RAMCHANDRAPUR Water Supply Scheme [ Block- BHATAR ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000919/2023-2024 4183/CMD 29/08/2023 30 M/S, S.S. ENTERPRISE. 56.97 30.58 53.68 40
3484 PURBA BARDHAMAN Purbasthali-I Burdwan Division SHYAMPUR PIPE WATER SUPPLY SCHEME , SM/15585 New Material Requisition To Resource Division RTOR000320/2023-2024 2197/BWD 12/05/2023 0 Resource Division 14.98 0.00 0 0
3485 PURBA BARDHAMAN Purbasthali-I Burdwan Division SHYAMPUR PIPE WATER SUPPLY SCHEME , SM/15585 New Material Requisition To Resource Division RTOR000547/2023-2024 4300/BWD 29/09/2023 0 Resource Division 0.58 0.00 0 0
3486 PURBA BARDHAMAN Purbasthali-I Burdwan Division SHYAMPUR PIPE WATER SUPPLY SCHEME , SM/15585 New Material Requisition To Resource Division RTOR000589/2023-2024 4946/BWD 10/11/2023 0 Resource Division 9.76 0.00 0 0
3487 PURBA BARDHAMAN Purbasthali-I Burdwan Division SHYAMPUR PIPE WATER SUPPLY SCHEME , SM/15585 New CONSTRUCTION OF TEMPORARY KIOSK FOR THE NECESSARY ARRANGEMENT OF ELECTRIFICATION OF TUBEWELL FOR SHYAMPUR PWSS UNDER KALNA SUB-DIVISION UNDER BURDWAN DIVISION, PHE DTE. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000570/2024-2025 1016/KSD 07/08/2024 15 DEL DELTA CONSTRUCTION 0.66 0.66 100 100
3488 PURBA BARDHAMAN Purbasthali-I Central Mechanical SHYAMPUR PIPE WATER SUPPLY SCHEME , SM/15585 New Quotation for new service connection at Shyampur PWSS PH-2. BILL/00458/2024-2025 BP-2024-25-250 01/08/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 8.61 0.00 0 0
3489 PURBA BARDHAMAN Purbasthali-I Central Mechanical SHYAMPUR PIPE WATER SUPPLY SCHEME , SM/15585 New Quotation for new service connection at Shyampur PWSS PH 1. BILL/00934/2024-2025 BP-2024-25-352 05/10/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 6.57 0.00 0 0
3490 PURBA BARDHAMAN Purbasthali-I Burdwan Division SHYAMPUR PIPE WATER SUPPLY SCHEME , SM/15585 New Different works related (sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of different capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site) to SHYAMPUR, GAHAK & SHANKRA Piped Water Supply Scheme under Purbasthali I Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000639/2023-2024 3957/BWD 07/09/2023 1051 M/S B. NANDI 758.52 146.35 19.29 20
3491 PURBA BARDHAMAN Purbasthali-I Central Mechanical SHYAMPUR PIPE WATER SUPPLY SCHEME , SM/15585 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Manganpur & others water supply scheme under Purbasthali 1 Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000714/2024-2025 2979/CMD 25/11/2024 90 H.K. DAS & CO. 53.27 0.00 0 0
3492 PURBA BARDHAMAN Kalna-II Burdwan Division ANGARSON PIPED WATER SUPPLY SCHEME , SM/15587 New Material Requisition To Resource Division RTOR000060/2023-2024 1962/BWD 25/04/2023 0 Resource Division 42.44 0.00 0 0
3493 PURBA BARDHAMAN Kalna-II Burdwan Division ANGARSON PIPED WATER SUPPLY SCHEME , SM/15587 New Material Requisition To Resource Division RTOR000210/2023-2024 2155/BWD 10/05/2023 0 Resource Division 13.32 0.00 0 0
3494 PURBA BARDHAMAN Kalna-II Burdwan Division ANGARSON PIPED WATER SUPPLY SCHEME , SM/15587 New Work Order for "CONSTRUCTION OF TEMPORARY KIOSK FOR THE NECESSARY ARRANGEMENT OF ELECTRIFICATION OF TUBEWELL FOR ANGERSON PWSS UNDER KALNA SUB-DIVISION UNDER BURDWAN DIVISION, PHE DTE." Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/001149/2023-2024 2105/KSD 04/03/2024 10 ER CONSTRUCTION & GENERAL ORDER SUPPLIER 0.66 0.66 100 2
3495 PURBA BARDHAMAN Kalna-II Central Mechanical ANGARSON PIPED WATER SUPPLY SCHEME , SM/15587 New New electric connection for Angarson PWSS, PH-1. BILL/01888/2023-2024 BP-2023-24-349 11/01/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 4.47 0.00 0 0
3496 PURBA BARDHAMAN Kalna-II Central Mechanical ANGARSON PIPED WATER SUPPLY SCHEME , SM/15587 New New service connection charges for Angarson PWSS TW-2 BILL/01865/2023-2024 BP-2023-24-350 11/01/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 6.07 0.00 0 0
3497 PURBA BARDHAMAN Kalna-II Burdwan Division ANGARSON PIPED WATER SUPPLY SCHEME , SM/15587 New Different works related (sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of different capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site) to ANGARSON, BHABANANDAPUR &DAFARPUR Piped Water Supply Scheme under Kalna ¿ II Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE,Junior Engineer, R.W.S. Burdwan Sub Division, P.H.E. Dt ORD/000702/2023-2024 4480/BWD 11/10/2023 724 M/S GHOSH & CO. 1,093.29 186.38 17.05 60
3498 PURBA BARDHAMAN Kalna-II Central Mechanical ANGARSON PIPED WATER SUPPLY SCHEME , SM/15587 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Khargakur & others water supply scheme under Kalna-2 Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000116/2024-2025 2393/CMD 02/08/2024 280 HANNAN BUILDERS PVT LTD 76.80 0.00 0 20
3499 PURBA BARDHAMAN Kalna-II Burdwan Division ANGARSON PIPED WATER SUPPLY SCHEME , SM/15587 New Pipeline laying by HDD method and different types of balance works in connection with different Augmentation & New Scheme [(SM/ 08103), (SM/13413), (SM/15587), (SM/16035), (SM/16287), (SM/16029), (SM/15581), (SM/14437), (SM/16028), (SM/16036) & (SM/14425)] within Kalna Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer ORD/001270/2024-2025 849/BWD 05/03/2025 180 S.P. CONSTRUCTION 683.30 0.00 0 0
3500 PURBA BARDHAMAN Burdwan Division RETROFITTING OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR TEANDUL , SM/16489 Retrofitting Construction of Path Way, Drain, Repairing of Pump House at 2nd TW Site and Providing leftout FHTC, Road Restoration with allied work for TENDUL Piped Water Supply Scheme, Block- Raina-I, within Burdwan Sub Division under Burdwan Division PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000965/2024-2025 4375/BWD 13/12/2024 90 DEY NIRMAN 12.69 0.00 0 0
3501 PURBA BARDHAMAN Burdwan Division RETROFITTING OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR TEANDUL , SM/16489 Retrofitting Construction of Boundary wall at Head Works Site of TEANDUL Water Supply Scheme under RAINA I Block of Burdwan Division, PHE Dte. (Length -151.00 Mtr, Col - 48 Nos). Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000012/2023-2024 1727/BWD 13/04/2023 60 HI-LIGHT ELECTRONICS 21.94 21.93 99.95 100
3502 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF AGRADWIP KASHIPUR PIPED WATER SUPPLY SCHEME , SM/15152 Augmentation Sinking of 300 X 200mm dia Tube Well 200 mtr. Depth by D.R. Rig method using UPVC pipe (CM) and UPVC Medium Well Screen (RMS) for Augmentation of AGRADWIP and its adjoining mouzas Piped Water Supply Scheme, Block Katwa II, Dist - Purba Bardhaman under Burdwan Division, PHE Dte. Assistant Engineer JUNIOR ENGINEER KATWA SUB-DIVISION PHE DTE ORD/000698/2022-2023 604/BWD 17/02/2023 30 AUXILIARY TUBE WELL DRILLERS 12.77 9.45 74 100
3503 PURBA BARDHAMAN Central Mechanical AUGMENTATION OF AGRADWIP KASHIPUR PIPED WATER SUPPLY SCHEME , SM/15152 Augmentation Supply & Installation of Submersible Pumping Machinery , Voltage Stabilizer, Chlorination system and internal House wiring for Tube well no.- 1 at Augumentation of Agradip Kashipur Water Supply Scheme under CMD, PHE Dte., Dist.- Purba-Bardhaman. Driller In-Charge Junior Engineer ORD/000079/2023-2024 2579/CMD 07/06/2023 486 MITRA ENTERPRISE 10.99 0.00 0 100
3504 PURBA BARDHAMAN Central Mechanical AUGMENTATION OF AGRADWIP KASHIPUR PIPED WATER SUPPLY SCHEME , SM/15152 Augmentation Installation of deptt.supplied Pump·motor set and other allied works at PH-1 of Aug. of Agradip Kashipur water supply scheme under CMD, PHE Dte., Dist.- Purba-Bardhaman. Driller In-Charge JUNIOR ENGINEER ORD/000486/2024-2025 513/DIC/BMSD(D) 20/08/2024 7 MITRA ENTERPRISE 0.33 0.00 0 100
3505 PURBA BARDHAMAN Central Mechanical AUGMENTATION OF AGRADWIP KASHIPUR PIPED WATER SUPPLY SCHEME , SM/15152 Augmentation NEW SERVICE CONNECTION FOR AGRADIP KASHIPUR PWSS PH 1 BILL/02954/2023-2024 BP-2023-24-637 15/03/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 6.92 0.00 0 0
3506 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF AGRADWIP KASHIPUR PIPED WATER SUPPLY SCHEME , SM/15152 Augmentation Augmentation of AGRADWIP Piped Water Supply Scheme with sinking of Tube-well, LDS, Rising Main, FHTC, Construction of 350 cum capacity RCC OHR with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drain and internal pathway at different TW site under KATWA-II Block, District:- Purba-Bardhaman._2ND CALL Assistant Engineer JUNIOR ENGINEER KATWA SUB-DIVISION PHE DTE ORD/000558/2023-2024 3778/BWD 29/08/2023 856 MOTHER INFRASTRUCTURE 420.60 327.93 77.97 86
3507 PURBA BARDHAMAN Ketugram-I Central Drilling MURGRAM PIPED WATER SUPPLY SCHEME , SM/15156 New Providing drilling crew and other allied works for construction of Tube Well (250mm X200mm X 114 Mtrs. Depth) by utilising Departmental Machineries for Murgram W/S Scheme (T/W-I & II) , Ketugram-I Block under Purba Bardhman District, Central Drilling Division, P.H.E. Dte. Driller In Charge Junior Engineer ORD/000173/2023-2024 1345/CDD 13/09/2023 30 OSMAN SEKH 16.61 0.00 0 0
3508 PURBA BARDHAMAN Ketugram-I Burdwan Division MURGRAM PIPED WATER SUPPLY SCHEME , SM/15156 New Material Requisition To Resource Division RTOR000011/2023-2024 1962/BWD 25/04/2023 0 Resource Division 1.38 0.00 0 0
3509 PURBA BARDHAMAN Ketugram-I Burdwan Division MURGRAM PIPED WATER SUPPLY SCHEME , SM/15156 New Material Requisition To Resource Division RTOR000347/2023-2024 2197/BWD 12/05/2023 0 Resource Division 18.01 0.00 0 0
3510 PURBA BARDHAMAN Ketugram-I Burdwan Division MURGRAM PIPED WATER SUPPLY SCHEME , SM/15156 New Material Requisition To Resource Division RTOR000744/2023-2024 5260/BWD 30/11/2023 0 Resource Division 20.18 0.00 0 0
3511 PURBA BARDHAMAN Ketugram-I Central Mechanical MURGRAM PIPED WATER SUPPLY SCHEME , SM/15156 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at MURGRAM Water Supply Scheme [ Block- KETUGRAM-1] under CMD, PHE Dte., Dist.- Purba-Bardhaman. Driller In-Charge Junior Engineer ORD/000850/2023-2024 4122/CMD 29/08/2023 30 S.K. ELECTRICALS 27.77 19.55 70.4 46
3512 PURBA BARDHAMAN Ketugram-I Central Mechanical MURGRAM PIPED WATER SUPPLY SCHEME , SM/15156 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Rajur & others water supply scheme under Ketugram-I Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. Driller In-Charge Junior Engineer ORD/000098/2024-2025 2407/CMD 02/08/2024 90 M.S. ENTERPRISE 82.29 0.00 0 0
3513 PURBA BARDHAMAN Ketugram-I Central Mechanical MURGRAM PIPED WATER SUPPLY SCHEME , SM/15156 New Supply & Delivery of 3 Phase actuator operated wafer type butterfly valve for Tube well No.- 1 at MURGRAM Water Supply Scheme [Block- KETUGRAM-1] under CMD, PHE Dte., Dist.- Purba-Bardhaman. Driller In-Charge ORD/001622/2023-2024 348/DIC/BMSD(D) 22/12/2023 7 SUBRATA BHADRA 0.98 0.00 0 0
3514 PURBA BARDHAMAN Ketugram-I Central Mechanical MURGRAM PIPED WATER SUPPLY SCHEME , SM/15156 New Supply & delivery of Submersible Pumping Machinery, Suspension clamp and tube well cover etc. Tube well No.- 1 at MURGRAM Water Supply Scheme [ Block· KETUGRAM -1] under CMD, PHE Dte,. Dist.- Purba-Bardhaman. Driller In-Charge Junior Engineer ORD/001627/2023-2024 25/DIC/BMSD(D) 05/01/2024 7 SUBRATA BHADRA 0.86 0.86 100 100
3515 PURBA BARDHAMAN Ketugram-I Central Mechanical MURGRAM PIPED WATER SUPPLY SCHEME , SM/15156 New Supply & delivery of valves, starter and Installation of Submersible Pumping Machinery for Tube well No. - 1 at MURGRAM Water Supply Scheme [ Block- KETUGRAM -1] under CMD, PHE Dte., Dist.· Purba Bardhaman. Driller In-Charge Junior Engineer ORD/001633/2023-2024 48/DIC/BMSD(D) 19/01/2024 15 SUBRATA BHADRA 0.69 0.59 85.51 100
3516 PURBA BARDHAMAN Ketugram-I Central Mechanical MURGRAM PIPED WATER SUPPLY SCHEME , SM/15156 New Supply & Delivery of Submersible cable and column pipes for Tube Well No No:-1 at MURGRAM water supply scheme[ Block - KETUGRAM -1] under CMD, PHE Dte,. Dist.- Purba-Bardhaman. Driller In-Charge Junior Engineer ORD/001629/2023-2024 41/DIC/BMSD(D) 15/01/2024 7 SUBRATA BHADRA 0.87 0.87 100 100
3517 PURBA BARDHAMAN Ketugram-I Central Mechanical MURGRAM PIPED WATER SUPPLY SCHEME , SM/15156 New Quotation for new service connection at Murgram W/S Scheme PH-II. BILL/01807/2023-2024 BP-2023-24-314 30/12/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.25 0.00 0 0
3518 PURBA BARDHAMAN Ketugram-I Central Mechanical MURGRAM PIPED WATER SUPPLY SCHEME , SM/15156 New Quotation for new service connection at Murgram W/S Scheme PH-I. BILL/01808/2023-2024 BP-2023-24-313 30/12/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 4.21 0.00 0 0
3519 PURBA BARDHAMAN Ketugram-I Central Mechanical MURGRAM PIPED WATER SUPPLY SCHEME , SM/15156 New NEW SERVICE CONNECTION FOR MURGRAM PWSS PH-I. BILL/00103/2024-2025 BP-2024-25-44 26/04/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 1.64 0.00 0 0
3520 PURBA BARDHAMAN Ketugram-I Burdwan Division MURGRAM PIPED WATER SUPPLY SCHEME , SM/15156 New Different works related (sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of different capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site) to MALGRAM, MURGRAM, MORGRAM & KHANJI Piped Water Supply Scheme under KETUGRAM -I Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer JUNIOR ENGINEER R.W.S. BURDWAN SUB-DIVISION PHE DTE ORD/000435/2023-2024 3387/BWD 03/08/2023 882 PUSPA ENTERPRISE 1,333.98 221.92 16.64 40
3521 PURBA BARDHAMAN Ketugram-I Burdwan Division MURGRAM PIPED WATER SUPPLY SCHEME , SM/15156 New Balance work for OHR, extension of pipeline to provide FHTC with sinking of tube well, construction of pump house, boundary wall, land development, plinth protection for pump house, approach road & other related work under Murgram, Moregram, Malgram, Khanji, PWSS under Katwa Sub Division, Block- Ketugram-I, Burdwan Division PHE Dte. Assistant Engineer JUNIOR ENGINEER R.W.S. BURDWAN SUB-DIVISION PHE DTE ORD/000289/2024-2025 2739/BWD 12/07/2024 173 PUSPA ENTERPRISE 185.75 24.12 12.99 72
3522 PURBA BARDHAMAN Raina-II Burdwan Division Pipuldaha Piped Water Supply Scheme , SM/15488 New Material Requisition To Resource Division RTOR000417/2023-2024 3865/BWD 01/09/2023 0 Resource Division 20.78 0.00 0 0
3523 PURBA BARDHAMAN Raina-II Burdwan Division Pipuldaha Piped Water Supply Scheme , SM/15488 New Material Requisition To Resource Division RTOR000371/2023-2024 2197/BWD 12/05/2023 0 Resource Division 3.55 0.00 0 0
3524 PURBA BARDHAMAN Raina-II Burdwan Division Pipuldaha Piped Water Supply Scheme , SM/15488 New Material Requisition To Resource Division RTOR000687/2023-2024 5078/BWD 23/11/2023 0 Resource Division 20.46 0.00 0 0
3525 PURBA BARDHAMAN Raina-II Central Mechanical Pipuldaha Piped Water Supply Scheme , SM/15488 New Continuation Order- Hiring of inspection vehicle (Diesel /CNG/LPG Driven) for supervision of site for the office of Assistant Engineer under CMD,PHE,Dte. [W.E.F-30.04.2024 to 28.06.2024 ] ASSISTANT ENGINEER Junior Engineer ORD/000423/2024-2025 703/CMSD 29/04/2024 60 SUBRATA BHADRA 0.79 0.00 0 0
3526 PURBA BARDHAMAN Raina-II Burdwan Division Pipuldaha Piped Water Supply Scheme , SM/15488 New Continuation work order for "Supply of one No. Diesel Driven Ambassador Car on hire basis for the office of the Assistant Engineer, Burdwan Sub-Division, PHE Dte. (Period from 01-06-2024 to 31-08-2024" JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000228/2024-2025 918/BSD 28/05/2024 92 SK. ASFIA 1.20 0.40 33.33 60
3527 PURBA BARDHAMAN Raina-II Central Mechanical Pipuldaha Piped Water Supply Scheme , SM/15488 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Satinandi,Sanko & others water supply scheme under Galsi-1 Block ; Serpur, Uchalan & others water supply scheme under Raina-2 Block and maro, loapur & others water supply scheme under Galsi-2 block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000397/2024-2025 2751/CMD 24/09/2024 90 ORIENTAL ENGINEERING CO. 88.42 0.00 0 0
3528 PURBA BARDHAMAN Raina-II Central Mechanical Pipuldaha Piped Water Supply Scheme , SM/15488 New New electric connection for Pipuldaha PWSS. BILL/01868/2023-2024 BP-2023-24-346 11/01/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 7.54 0.00 0 0
3529 PURBA BARDHAMAN Raina-II Central Mechanical Pipuldaha Piped Water Supply Scheme , SM/15488 New New electric connection for Pipuldaha PWSS, PH-1. BILL/01883/2023-2024 BP-2023-24-345 11/01/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.76 0.00 0 0
3530 PURBA BARDHAMAN Raina-II Burdwan Division Pipuldaha Piped Water Supply Scheme , SM/15488 New PIPULDAHA Piped Water Supply Scheme with sinking of Tube-well, LDS, Rising Main, FHTC, Construction of 350 cum capacity RCC OHR with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drain and internal pathway at different TW site under Raina-II Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000458/2023-2024 3440/BWD 08/08/2023 1058 SK ABDUL HALIM 644.77 289.73 44.94 97
3531 PURBA BARDHAMAN Raina-II Central Mechanical Pipuldaha Piped Water Supply Scheme , SM/15488 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at Pipuldaha Water Supply Scheme [ Block- Raina-2 ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000728/2023-2024 4039/CMD 29/08/2023 30 ANANTA ELECTRICAL ENGINEERING CONSTRUCTION 28.94 11.65 40.26 50
3532 PURBA BARDHAMAN Raina-II Burdwan Division Pipuldaha Piped Water Supply Scheme , SM/15488 New Continuation Work Order for supply of inspection Vehicle for inspection of different JJM related (schemes)works as and when required including supply of driver & fuel(minimum 8 hours duty per day) and all taxes etc. for Burdwan Sub-Division under Burdwan Division,PHE Dte consider 96.00 Km. run per day (Period from 01-11-2024 to 31-01-2025) Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000896/2024-2025 2438/BSD 29/10/2024 66 PARVIN BEGAM 0.85 0.56 65.88 100
3533 PURBA BARDHAMAN Burdwan Division AUGUMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR ALIPUR , SM/15191 Augmentation Sinking of 300 X 200mm dia Tube Well 150 mtr. Depth by D.R. Rig method using UPVC pipe (CD) and UPVC Deep Well Screen (RDS) for SASINARA Z-II W/S Scheme at Kalsi Mouza, RASULPUR W/S Scheme at 4th TW site & ALIPUR W/S Scheme at 4th TW site under Memari-I Block under within Burdwan Sub-Division, PHE Dte. [For 3 Nos. Tube well]. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000159/2023-2024 2455/BWD 31/05/2023 60 SUSUNIA GP CO. OPERATIVE LABOUR CONTRACT AND CONSTRUCTION SOCIETY LTD. 39.76 13.23 33.27 100
3534 PURBA BARDHAMAN Burdwan Division AUGUMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR ALIPUR , SM/15191 Augmentation Preparation and Submission of DPR for Augmentation of Alipore PWSS under Memari-I Development Block under Burdwan Division, P.H.E Dte.[2nd Call] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000394/2023-2024 1582/BSD 24/07/2023 15 MEASURE LAND 0.78 0.77 98.72 100
3535 PURBA BARDHAMAN Central Mechanical AUGUMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR ALIPUR , SM/15191 Augmentation Supply & Installation of Submersible Pumping Machinery , Voltage Stabilizer, Chlorination system and internal House wiring for Tube well no.- 1&2 at Augumentation of Alipur Water Supply Scheme under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER Junior Engineer ORD/000088/2023-2024 2593/CMD 07/06/2023 30 SOUNAK ENTERPRISE 22.73 10.85 47.73 50
3536 PURBA BARDHAMAN Burdwan Division AUGUMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR ALIPUR , SM/15191 Augmentation Construction of boundary wall and Soak Well at Head Works Site, Extension of Pipe Line at Alipur Adibasipara and Installation of water level indicator of ALIPUR Water Supply Scheme under MEMARI-I Block of Burdwan Division, PHE Dte. (Length -230.00 Mtr, Col-85 Nos). Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. Junior Engineer, RWS, Memari-I Dev. Bolck ORD/000180/2024-2025 2300/BWD 20/06/2024 120 ROHAN MONDAL 31.47 4.29 13.63 17
3537 PURBA BARDHAMAN Burdwan Division AUGUMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR ALIPUR , SM/15191 Augmentation Construction of switch rooms & Rising main at different TW site for ALIPUR Piped Water Supply Scheme under Memari - I Block, District:- Purba-Bardhaman under Burdwan Division, PHE. Dte. ORD/000666/2023-2024 4162/BWD 20/09/2023 60 M/S PALASH BISWAS 8.12 7.19 88.55 100
3538 PURBA BARDHAMAN Central Mechanical AUGUMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR ALIPUR , SM/15191 Augmentation Quotation for new electric service connection at Alipur PH NO.-3 BILL/01756/2023-2024 BP-2023-24-266 11/12/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.78 0.00 0 0
3539 PURBA BARDHAMAN Burdwan Division AUGUMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR ALIPUR , SM/15191 Augmentation Restoration of concrete road by Cement concrete (mix 1:1.5:3), Providing balance FHTC, parallel pipeline, drainage system, boundary wall, Bridge, land development, Sluice valve chamber for smooth water supply of FHTC work for ALIPUR PWSS and its adjoining mouzas within MEMARI-I BLOCK under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/001095/2024-2025 430/BWD 20/01/2025 287 DULAL MAJUMDER 117.26 0.00 0 30
3540 PURBA BARDHAMAN Central Mechanical AUGUMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR ALIPUR , SM/15191 Augmentation Supply and installation of Electro-Magnetic flow meter at HARIGRAM, KUCHUT & others water supply scheme under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. ASSISTANT ENGINEER Junior Engineer ORD/000564/2024-2025 3103/CMD 11/12/2024 60 S DUTTA 15.06 0.00 0 0
3541 PURBA BARDHAMAN Burdwan Division AUGUMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR ALIPUR , SM/15191 Augmentation Laying parallel 200 mm dia pipeline at Shyamnagar of Alipur pwss under Memari-I Development Block under Burdwan Division PHE Dte. Junior Engineer, RWS, Memari-I Dev. Bolck ORD/000044/2025-2026 1026/BSD 08/05/2025 30 ROHAN MONDAL 4.92 0.00 0 0
3542 PURBA BARDHAMAN Burdwan Division AUGUMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR ALIPUR , SM/15191 Augmentation Replacing damaged PVC water supply line and re installation of FHTC at Shyamnagar for Alipur and its Adjoining Mouza W/S Scheme, block -Memari-I within Burdwan Sub-Division ,PHE Dte Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. Junior Engineer, RWS, Memari-I Dev. Bolck ORD/001085/2024-2025 114/BSD 16/01/2025 30 MUKHERJEE ENTERPRISE 2.44 0.00 0 80
3543 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF KASHIARA PIPED WATER SUPPLY SCHEME , SM/15562 Augmentation Detail route survey, design of distribution network and preparation of estimate, drawing & DPR for providing FHTC in the scheme KASHIARA PWSS (Sl No-5) Assistant Engineer JUNIOR ENGINEER KATWA SUB-DIVISION PHE DTE ORD/000073/2023-2024 397/KTS 13/04/2023 30 SIRCON ENGINEERING SERVICES 2.62 2.62 100 100
3544 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF KASHIARA PIPED WATER SUPPLY SCHEME , SM/15562 Augmentation Augmentation of KASHIARA Piped Water Supply Scheme with sinking of Tube-well, LDS, Rising Main, FHTC, Construction of 450 cum capacity RCC OHR with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drain and internal pathway at different TW site under MONGALKOTE Block, District:- Purba-Bardhaman. Assistant Engineer JUNIOR ENGINEER R.W.S. BURDWAN SUB-DIVISION PHE DTE ORD/000753/2023-2024 4666/BWD 01/11/2023 427 M/S B. RAI CONSTRUCTION COMPANY 372.35 103.98 27.93 30
3545 PURBA BARDHAMAN Central Mechanical AUGMENTATION OF KASHIARA PIPED WATER SUPPLY SCHEME , SM/15562 Augmentation Yard lighting arrangement & allied works at Kasiara water supply scheme under Mangalkote Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. Driller In-Charge Junior Engineer ORD/000409/2024-2025 2789/CMD 01/10/2024 60 BABA MALLESHWAR ENTERPRISE. 5.55 0.00 0 0
3546 PURBA BARDHAMAN Central Mechanical AUGMENTATION OF KASHIARA PIPED WATER SUPPLY SCHEME , SM/15562 Augmentation Quotation for new service connection at Augmentation of Kashiara PWSS TW-1 BILL/01088/2024-2025 BP-2024-25-398 22/11/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.75 0.00 0 0
3547 PURBA BARDHAMAN Ketugram-II Burdwan Division CHAR SUJAPUR PIPED WATER SUPPLY SCHEME , SM/15165 New Material Requisition To Resource Division RTOR000016/2023-2024 1962/BWD 25/04/2023 0 Resource Division 1.28 0.00 0 0
3548 PURBA BARDHAMAN Ketugram-II Burdwan Division CHAR SUJAPUR PIPED WATER SUPPLY SCHEME , SM/15165 New Material Requisition To Resource Division RTOR000299/2023-2024 2197/BWD 12/05/2023 0 Resource Division 9.58 0.00 0 0
3549 PURBA BARDHAMAN Ketugram-II Burdwan Division CHAR SUJAPUR PIPED WATER SUPPLY SCHEME , SM/15165 New Material Requisition To Resource Division RTOR000746/2023-2024 5254/BWD 30/11/2023 0 Resource Division 20.18 0.00 0 0
3550 PURBA BARDHAMAN Ketugram-II Burdwan Division CHAR SUJAPUR PIPED WATER SUPPLY SCHEME , SM/15165 New CHAR SUJAPUR Piped Water Supply Scheme with sinking of Tube-well, LDS, Rising Main, FHTC, Construction of 300 cum capacity RCC OHR with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drain and internal pathway at different TW site under KETUGRAM -II Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer JUNIOR ENGINEER R.W.S. BURDWAN SUB-DIVISION PHE DTE ORD/000179/2023-2024 3032/BWD 14/07/2023 365 M/S H.R. CONSTRUCTION 471.47 385.07 81.67 91
3551 PURBA BARDHAMAN Ketugram-II Burdwan Division CHAR SUJAPUR PIPED WATER SUPPLY SCHEME , SM/15165 New Balance work for OHR, extension of pipeline to provide FHTC with sinking of tube well, construction of pump house, boundary wall, land development, plinth protection for pump house & OHR under Charsujapur PWSS, Block-Ketugram-II under Katwa Sub Division within Burdwan division PHE Dte. Assistant Engineer JUNIOR ENGINEER R.W.S. BURDWAN SUB-DIVISION PHE DTE ORD/000360/2024-2025 2923/BWD 26/07/2024 90 M/S H.R. CONSTRUCTION 81.31 0.00 0 0
3552 PURBA BARDHAMAN Ketugram-II Central Mechanical CHAR SUJAPUR PIPED WATER SUPPLY SCHEME , SM/15165 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Kankurhati & others water supply scheme under Ketugram-2 Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. Driller In-Charge Junior Engineer ORD/000103/2024-2025 2408/CMD 02/08/2024 90 DIPALI CONSTRUCTION 41.95 0.00 0 0
3553 PURBA BARDHAMAN Ketugram-II Central Mechanical CHAR SUJAPUR PIPED WATER SUPPLY SCHEME , SM/15165 New New service connection for Char Sujapur PWSS PH-1. BILL/02288/2023-2024 BP-2023-24-414 19/01/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 4.99 0.00 0 0
3554 PURBA BARDHAMAN Ketugram-II Central Mechanical CHAR SUJAPUR PIPED WATER SUPPLY SCHEME , SM/15165 New New service connection for Char Sujapur PWSS PH-2. BILL/02289/2023-2024 BP-2023-24-415 19/01/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.27 0.00 0 0
3555 PURBA BARDHAMAN Ketugram-II Central Mechanical CHAR SUJAPUR PIPED WATER SUPPLY SCHEME , SM/15165 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-3 at Char Sujapur Water Supply Scheme [ BLOCK- Ketugram-II] under CMD, PHE Dte., Dist.- Purba-Bardhaman. Driller In-Charge Junior Engineer ORD/001394/2024-2025 883/CMD 26/03/2025 60 CHATTERJEE ENTERPRISE 12.31 0.00 0 0
3556 PURBA BARDHAMAN Ketugram-I Central Drilling CHINISPUR PIPED WATER SUPPLY SCHEME , SM/15170 New Providing drilling crew and other allied works for construction of Tube Well (250mm X200mm X 114 Mtrs. Depth) by utilising Departmental Machineries for Chinispur W/S Scheme (T/W-I & II) , Ketugram-I Block under PurbaBardhman District, Central Drilling Division, P.H.E. Dte. Driller In Charge Junior Engineer ORD/000162/2023-2024 1054 16/08/2023 30 OSMAN SEKH 16.61 0.00 0 0
3557 PURBA BARDHAMAN Ketugram-I Burdwan Division CHINISPUR PIPED WATER SUPPLY SCHEME , SM/15170 New Material Requisition To Resource Division RTOR000097/2023-2024 1962/BWD 25/04/2023 0 Resource Division 2.34 0.00 0 0
3558 PURBA BARDHAMAN Ketugram-I Burdwan Division CHINISPUR PIPED WATER SUPPLY SCHEME , SM/15170 New Material Requisition To Resource Division RTOR000235/2023-2024 2197/BWD 12/05/2023 0 Resource Division 20.24 0.00 0 0
3559 PURBA BARDHAMAN Ketugram-I Burdwan Division CHINISPUR PIPED WATER SUPPLY SCHEME , SM/15170 New Material Requisition To Resource Division RTOR000747/2023-2024 5255/BWD 30/11/2023 0 Resource Division 20.18 0.00 0 0
3560 PURBA BARDHAMAN Ketugram-I Central Mechanical CHINISPUR PIPED WATER SUPPLY SCHEME , SM/15170 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Rajur & others water supply scheme under Ketugram-I Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. Driller In-Charge Junior Engineer ORD/000098/2024-2025 2407/CMD 02/08/2024 90 M.S. ENTERPRISE 82.29 0.00 0 0
3561 PURBA BARDHAMAN Ketugram-I Central Mechanical CHINISPUR PIPED WATER SUPPLY SCHEME , SM/15170 New Quotation for new service connection CHINISPUR PWSS TW No. 2. BILL/00777/2024-2025 BP-2024-25-296 13/09/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.51 0.00 0 0
3562 PURBA BARDHAMAN Ketugram-I Central Mechanical CHINISPUR PIPED WATER SUPPLY SCHEME , SM/15170 New Quotation for new service connection Chinispur PWSS TW No. 1. BILL/00780/2024-2025 BP-2024-25-295 13/09/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 4.07 0.00 0 0
3563 PURBA BARDHAMAN Ketugram-I Burdwan Division CHINISPUR PIPED WATER SUPPLY SCHEME , SM/15170 New Different works related (sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of different capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site) to AMEGERIA, ARGUN, CHINISPUR & KULUTIA Piped Water Supply Scheme under KETUGRAM -I Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer JUNIOR ENGINEER R.W.S. BURDWAN SUB-DIVISION PHE DTE ORD/000533/2023-2024 3630/BWD 21/08/2023 1107 M/S GOUTAM DAS 1,421.70 114.81 8.08 75
3564 PURBA BARDHAMAN Ketugram-I Central Mechanical CHINISPUR PIPED WATER SUPPLY SCHEME , SM/15170 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at CHINISPUR Water Supply Scheme [ Block- KETUGRAM-1] under CMD, PHE Dte., Dist.- Purba-Bardhaman. Driller In-Charge Junior Engineer ORD/000868/2023-2024 4116/CMD 29/08/2023 640 M/S, S.S. ENTERPRISE. 28.48 5.90 20.72 88
3565 PURBA BARDHAMAN Ketugram-I Burdwan Division CHINISPUR PIPED WATER SUPPLY SCHEME , SM/15170 New Hiring of one no Diesel Motor Cab (BS-VI) including the cost of fuel . mobile & other charges for the inspection of the different projects of JJM for the office of the Assistant Engineer, Katwa Sub-Division, PHE Dte. (Period:- 01/03/2025 to 31/08/2025) [Sl No-02] Assistant Engineer JUNIOR ENGINEER KATWA SUB-DIVISION PHE DTE ORD/001324/2024-2025 321/KTS 28/02/2025 184 HAMID SK 1.84 0.00 0 0
3566 PURBA BARDHAMAN Ketugram-I Burdwan Division CHINISPUR PIPED WATER SUPPLY SCHEME , SM/15170 New Road crossing through metal / concrete road by Jack Push Method for AMEGERIA (SM/16023), ARGUN (SM/16482), CHINISPUR (SM/15170) and KULITIA (SM/15167) PWSS under Ketugram I Development Block under Katwa Sub Division within Burdwan Division, PHE. Dte. Assistant Engineer JUNIOR ENGINEER R.W.S. BURDWAN SUB-DIVISION PHE DTE ORD/001311/2024-2025 977/BWD 13/03/2025 60 M/S GOUTAM DAS 39.22 0.00 0 100
3567 PURBA BARDHAMAN Central Mechanical AUGMENTATION OF BERWA PIPED WATER SUPPLY SCHEME , SM/15568 Augmentation NEW SERVICE CONNECTION FOR AUGMENTATION OF BERWA PIPED WATER SUPPLY SCHEME. BILL/02827/2023-2024 BP-2023-24-594 04/03/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 7.25 0.00 0 0
3568 PURBA BARDHAMAN Central Mechanical AUGMENTATION OF BERWA PIPED WATER SUPPLY SCHEME , SM/15568 Augmentation Supply & Installation of Submersible Pumping Machinery , Voltage Stabilizer, Chlorination system and internal House wiring for Tube well no.- 1&2 at Augumentation of Berawa Water Supply Scheme under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER Junior Engineer ORD/000101/2023-2024 2600/CMD 07/06/2023 755 SOUNAK ENTERPRISE 22.60 0.00 0 50
3569 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF BERWA PIPED WATER SUPPLY SCHEME , SM/15568 Augmentation Augmentation of BERWA Piped Water Supply Scheme with sinking of Tube-well, LDS, Rising Main, FHTC, Construction of 150 cum capacity RCC OHR with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drain and internal pathway at different TW site under Memari-II Block, District:- Purba-Bardhaman. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER RWS BURDWAN SUB-DIVISION PHE DTE ORD/000587/2023-2024 3743/BWD 28/08/2023 942 ROY ENTERPRISE 334.82 132.35 39.53 65
3570 PURBA BARDHAMAN Central Mechanical AUGMENTATION OF BERWA PIPED WATER SUPPLY SCHEME , SM/15568 Augmentation Illumination arrangement & different electro-mechanical works at BARWA water supply scheme under Memari-I Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. ASSISTANT ENGINEER Junior Engineer ORD/000443/2024-2025 2796/CMD 01/10/2024 60 A.K. ENTERPRISE 11.65 0.00 0 60
3571 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF BERWA PIPED WATER SUPPLY SCHEME , SM/15568 Augmentation Replacement of Tube-well & Rising main at Head work TW site for BARWA Piped Water Supply Scheme under MEMARI-II Block, District:- Purba-Bardhaman. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER RWS BURDWAN SUB-DIVISION PHE DTE ORD/000226/2024-2025 2523/BWD 03/07/2024 90 ROY ENTERPRISE 15.27 12.14 79.5 80
3572 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF BERWA PIPED WATER SUPPLY SCHEME , SM/15568 Augmentation Different Types of work involved in connection with different Augmentation & Retrofitting Schemes (06 Nos.) Piped Water Supply Scheme under Memari II Block within Burdwan Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/001269/2024-2025 848/BWD 05/03/2025 120 PROJECT INDIA 394.29 0.00 0 0
3573 PURBA BARDHAMAN Central Mechanical AUGUMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR GHOSH , SM/15179 Augmentation Supply & Installation of Submersible Pumping Machinery , Voltage Stabilizer, Chlorination system and internal House wiring for Tube well no.- 1 at Augumentation of Ghosh Water Supply Scheme under CMD, PHE Dte., Dist.- Purba-Bardhaman. ORD/000100/2023-2024 2588/CMD 07/06/2023 30 SUDIPTA GHOSH 11.26 0.00 0 0
3574 PURBA BARDHAMAN Burdwan Division AUGUMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR GHOSH , SM/15179 Augmentation Sinking of 300 X 200mm dia Tube Well 150 mtr. Depth by D.R. Rig method using UPVC pipe (CD) and UPVC Deep Well Screen (RDS) for 3RD TW site of GHOSH W/S Scheme under Memari-I Block within Burdwan Sub-Division, PHE Dte. [For Bahabpur village]. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. Junior Engineer, RWS, Memari-I Dev. Bolck ORD/000200/2023-2024 2703/BWD 08/06/2023 30 DAS CONSTRUCTION 13.25 0.00 0 0
3575 PURBA BARDHAMAN Burdwan Division AUGUMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR GHOSH , SM/15179 Augmentation Construction of switch rooms & Rising main at different TW site for GHOSH Piped Water Supply Scheme under Memari - I Block, District:- Purba-Bardhaman under Burdwan Division, PHE. Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. Junior Engineer, RWS, Memari-I Dev. Bolck ORD/000865/2023-2024 5296/BWD 01/12/2023 60 TRIYA CONSTRUCTION 8.94 0.00 0 0
3576 PURBA BARDHAMAN Burdwan Division AUGUMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR GHOSH , SM/15179 Augmentation Preparation and Submission of DPR for Augmentation of GHOSH PWSS under Memari-I Development Block under Burdwan Division, P.H.E Dte.[2nd Call] ORD/000365/2023-2024 1527/BSD 17/07/2023 15 MEASURE LAND 0.78 0.00 0 0
3577 PURBA BARDHAMAN Central Mechanical AUGUMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR GHOSH , SM/15179 Augmentation Supply & Installation of voltage correcting device. LED fixture set & allied works at GHOSH Water Supply Scheme PH-II under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER Junior Engineer ORD/000148/2024-2025 1037/CMSD 26/07/2024 30 BENGAL ELECTRICAL CONSTRUCTION 3.28 3.25 99.09 100
3578 PURBA BARDHAMAN Burdwan Division AUGUMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR GHOSH , SM/15179 Augmentation Restoration of concrete road by Cement concrete (mix 1:1.5:3), Providing balance FHTC, parallel pipeline, drainage system, boundary wall, Bridge, land development, Sluice valve chamber for smooth water supply of FHTC work for GHOSH PWSS and its adjoining mouzas within MEMARI-I BLOCK under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/001193/2024-2025 612/BWD 11/02/2025 90 PAL CONSTRUCTION 29.22 0.00 0 0
3579 PURBA BARDHAMAN Burdwan Division AUGUMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR GHOSH , SM/15179 Augmentation Designing, making and erection of Sign Board for SWAJAL GRAM in Mandaljana village of Memari-I Block under Ghosh Piped Water Supply Scheme within Burdwan Sub-Division under Burdwan Division, PHE Dte. (5 nos Board) JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000496/2025-2026 2365/BSD 21/08/2025 10 RAJ-N-MAHARAJ MANPOWER & SECURITY SOLUTIONS 0.72 0.00 0 0
3580 PURBA BARDHAMAN Burdwan Division AUGUMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR GHOSH , SM/15179 Augmentation Laying of parallel pipeline on distribution system for FHTC work for GHOSH Piped Water Supply Scheme at KABIRPUR mouza within Memari I Block under Burdwan Divn., PHE. Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000689/2025-2026 1408/BWD 16/05/2025 45 M/S ANAND CONSTRUCTION 7.40 0.00 0 100
3581 PURBA BARDHAMAN Kalna-II Burdwan Division BHABANANDAPUR PIPED WATER SUPPLY SCHEME , SM/16024 New Material Requisition To Resource Division RTOR000069/2023-2024 1962/BWD 25/04/2023 0 Resource Division 44.37 0.00 0 0
3582 PURBA BARDHAMAN Kalna-II Burdwan Division BHABANANDAPUR PIPED WATER SUPPLY SCHEME , SM/16024 New Material Requisition To Resource Division RTOR000251/2023-2024 2197/BWD 12/05/2023 0 Resource Division 18.56 0.00 0 0
3583 PURBA BARDHAMAN Kalna-II Central Mechanical BHABANANDAPUR PIPED WATER SUPPLY SCHEME , SM/16024 New New service connection for BHABANANDAPUR PWSS TW-1. BILL/02394/2023-2024 BP-2023-24-500 06/02/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 6.85 0.00 0 0
3584 PURBA BARDHAMAN Kalna-II Central Mechanical BHABANANDAPUR PIPED WATER SUPPLY SCHEME , SM/16024 New Additional quotation for Bhavanandapur PWSS PH-1 BILL/00427/2024-2025 BP-2024-25-223 26/07/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 0.67 0.00 0 0
3585 PURBA BARDHAMAN Kalna-II Central Mechanical BHABANANDAPUR PIPED WATER SUPPLY SCHEME , SM/16024 New Quotation for new service connection for Bhabanandapur PWSS PH-2. BILL/00284/2024-2025 BP-2024-25-144 11/06/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 4.78 0.00 0 0
3586 PURBA BARDHAMAN Kalna-II Burdwan Division BHABANANDAPUR PIPED WATER SUPPLY SCHEME , SM/16024 New Different works related (sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of different capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site) to ANGARSON, BHABANANDAPUR &DAFARPUR Piped Water Supply Scheme under Kalna ¿ II Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE,Junior Engineer, R.W.S. Burdwan Sub Division, P.H.E. Dt ORD/000702/2023-2024 4480/BWD 11/10/2023 724 M/S GHOSH & CO. 1,093.29 188.94 17.28 60
3587 PURBA BARDHAMAN Kalna-II Burdwan Division BHABANANDAPUR PIPED WATER SUPPLY SCHEME , SM/16024 New Different types of works involve in connection with Augmentation of KALYANPUR (SM/16299) Water Supply Scheme & BHABANANDAPUR (SM/16024) Water Supply Scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer JUNIOR ENGINEER RWS KALNA2 ORD/000189/2024-2025 2433/BWD 27/06/2024 247 BALAJEE ENTERPRISES 225.16 45.18 20.07 2
3588 PURBA BARDHAMAN Kalna-II Central Mechanical BHABANANDAPUR PIPED WATER SUPPLY SCHEME , SM/16024 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Khargakur & others water supply scheme under Kalna-2 Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000116/2024-2025 2393/CMD 02/08/2024 280 HANNAN BUILDERS PVT LTD 76.80 0.00 0 20
3589 PURBA BARDHAMAN Kalna-II Burdwan Division BALINDAR PIPED WATER SUPPLY SCHEME , SM/16478 New Material Requisition To Resource Division RTOR000056/2023-2024 1962/BWD 25/04/2023 0 Resource Division 45.18 0.00 0 0
3590 PURBA BARDHAMAN Kalna-II Burdwan Division BALINDAR PIPED WATER SUPPLY SCHEME , SM/16478 New Material Requisition To Resource Division RTOR000204/2023-2024 2155/BWD 10/05/2023 0 Resource Division 11.21 0.00 0 0
3591 PURBA BARDHAMAN Kalna-II Burdwan Division BALINDAR PIPED WATER SUPPLY SCHEME , SM/16478 New Work order for "Restoration of pipeline with other allied works at different places of Bharkunda,potna,Bara dhamash,Balindar,Tola mouja under Balindar Pwss due to construction of rcc cover drain & widening of rcc concrete road constructed by PRI body under Kalna-II panchayat samiti under Kalna Sub-Division under Burdwan Division, PHE Dte.". Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000858/2024-2025 1844/KSD 27/11/2024 15 SUPRITI ENTERPRISE 2.86 0.00 0 0
3592 PURBA BARDHAMAN Kalna-II Burdwan Division BALINDAR PIPED WATER SUPPLY SCHEME , SM/16478 New Work Order for "CONSTRUCTION OF TEMPORARY KIOSK FOR THE NECESSARY ARRANGEMENT OF ELECTRIFICATION OF TUBEWELL FOR BALINDAR PWSS UNDER KALNA SUB-DIVISION UNDER BURDWAN DIVISION, PHE DTE." Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/001150/2023-2024 2106/KSD 04/03/2024 10 ER CONSTRUCTION & GENERAL ORDER SUPPLIER 0.66 0.66 100 2
3593 PURBA BARDHAMAN Kalna-II Central Mechanical BALINDAR PIPED WATER SUPPLY SCHEME , SM/16478 New New service connection for BALINDAR PWSS TW-2. BILL/02401/2023-2024 BP-2023-24-503 06/02/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 8.97 0.00 0 0
3594 PURBA BARDHAMAN Kalna-II Central Mechanical BALINDAR PIPED WATER SUPPLY SCHEME , SM/16478 New New service connection charges for Balindar PWSS TW-1 BILL/01867/2023-2024 BP-2023-24-357 11/01/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 4.20 0.00 0 0
3595 PURBA BARDHAMAN Kalna-II Burdwan Division BALINDAR PIPED WATER SUPPLY SCHEME , SM/16478 New Different works related (sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of different capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site) to BALINDAR, CHAK SHIMLA & DWARIATAN Piped Water Supply Scheme under Kalna II Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000539/2023-2024 3700/BWD 24/08/2023 770 SUPRITI ENTERPRISE 1,424.22 83.43 5.86 30
3596 PURBA BARDHAMAN Kalna-II Central Mechanical BALINDAR PIPED WATER SUPPLY SCHEME , SM/16478 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at BALINDAR Water Supply Scheme [ Block- KALNA-2] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000858/2023-2024 4126/CMD 29/08/2023 756 ASIA CONSTRUCTION. 28.98 0.00 0 90
3597 PURBA BARDHAMAN Kalna-II Central Mechanical BALINDAR PIPED WATER SUPPLY SCHEME , SM/16478 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Khargakur & others water supply scheme under Kalna-2 Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000116/2024-2025 2393/CMD 02/08/2024 280 HANNAN BUILDERS PVT LTD 76.80 0.00 0 20
3598 PURBA BARDHAMAN Kalna-II Burdwan Division BALINDAR PIPED WATER SUPPLY SCHEME , SM/16478 New Construction of Pipe carrying Truss Bridge for carrying 200 mm dia MS Pipe at PWD Bridge under Hatgachha Mouza under the command area of Balindar PWSS (SM/16478) within Kalna -II block of Kalna Sub-Division, PHE Dte under Burdwan Division, PHE Dte. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000017/2025-2026 1244/BWD 23/04/2025 60 M/S DATTA ENTERPRISE 29.30 0.00 0 1
3599 PURBA BARDHAMAN Burdwan Division AUGUMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR SHAKTIGARH , SM/16479 Augmentation Continuation for the work of Supply of one No. Diesel Driven Car (other than Ambasader) on hire basis for the office of the Assistant Engineer, RWS Burdwan Sub-Division, PHE Dte. (Period from 01-11-2024 to 31-12-2024). ASSISTANT ENGINEER R.W.S. BURDWAN SUB-DIVISION PHE DTE Contractual Junior Engineer ORD/000763/2024-2025 352/RWS 30/10/2024 61 MD HASIN 0.80 0.00 0 0
3600 PURBA BARDHAMAN Central Mechanical AUGUMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR SHAKTIGARH , SM/16479 Augmentation Illumination arrangement & different electro-mechanical works at SAKTIGARH water supply scheme under Bardhaman-II Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman ASSISTANT ENGINEER Junior Engineer ORD/000479/2024-2025 2956/CMD 20/11/2024 60 CHOUDHURY ENTERPRISE 14.34 0.00 0 0
3601 PURBA BARDHAMAN Burdwan Division AUGUMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR SHAKTIGARH , SM/16479 Augmentation Continuation for the work of Supply of one No. Diesel Driven Car ( other than Ambasader) on hire basis for the office of the Assistant Engineer, RWS Burdwan Sub-Division, PHE Dte. (Period from 01-09-2024 to 31-10-2024). Contractual Junior Engineer ORD/000561/2024-2025 274/RWS 30/08/2024 61 MD HASIN 0.80 0.00 0 0
3602 PURBA BARDHAMAN Burdwan Division AUGUMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR SHAKTIGARH , SM/16479 Augmentation Supply of one No. Diesel Driven Car ( other than Ambasader) on hire basis for the office of the Assistant Engineer, RWS Burdwan Sub-Division, PHE Dte. (Period from 01-07-2024 to 31-08-2024). Contractual Junior Engineer ORD/000364/2024-2025 207/RWS 28/06/2024 61 MD HASIN 0.80 0.57 71.25 0
3603 PURBA BARDHAMAN Burdwan Division AUGUMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR SHAKTIGARH , SM/16479 Augmentation Continuation Work for the supply of one no. Diesel driven Motor Cab/Maxi Cab (Air Conditioner) on hire basis for the office of the Assistant Engineer, to be used by the Assistant Engineer, RWS Burdwan Sub-Divn., PHE. Dte. (Period from 01/01/2024 to 29/02/2024) Junior Engineer, R.W.S. Burdwan Sub Division, P.H.E. Dt ORD/001221/2023-2024 403/RWS 29/12/2023 62 MD HASIN 0.80 0.50 62.5 0
3604 PURBA BARDHAMAN Burdwan Division AUGUMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR SHAKTIGARH , SM/16479 Augmentation Protection work of LDS and approach road to 2nd Pump-House of Saktigarh PWSS Augmentation at the node point of 161-166 under Burdwan Division, PHE Dte. [SM-16479] Junior Engineer, R.W.S. Burdwan Sub Division, P.H.E. Dt ORD/001170/2023-2024 94/RWS 13/03/2024 20 JAYANTA CHAKRABORTY 0.95 0.95 100 100
3605 PURBA BARDHAMAN Burdwan Division AUGUMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR SHAKTIGARH , SM/16479 Augmentation Crossing of Old G.T Road near Head Works with 250 mm dia pipeline through pushing of 750mm.dia RCC casing pipe by hydraulic jacking method for Saktigarh W/S Scheme (Augmentation) under Burdwan Division, PHE Dte. Junior Engineer, R.W.S. Burdwan Sub Division, P.H.E. Dt ORD/000083/2024-2025 153/RWS 29/04/2024 25 IJABUL SEKH 6.55 6.55 100 100
3606 PURBA BARDHAMAN Burdwan Division AUGUMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR SHAKTIGARH , SM/16479 Augmentation Protection of LDS of Saktigarh PWSS Augmentation at the node point of 36-44-64 under Burdwan Division, PHE Dte. [SM-16479] Junior Engineer, R.W.S. Burdwan Sub Division, P.H.E. Dt ORD/001168/2023-2024 92/RWS 13/03/2024 20 KHUSI BHAKAT 0.78 0.76 97.44 100
3607 PURBA BARDHAMAN Burdwan Division AUGUMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR SHAKTIGARH , SM/16479 Augmentation Protection of LDS of Saktigarh PWSS Augmentation at the node point of 75-123 under Burdwan Division, PHE Dte. [SM-16479] Junior Engineer, R.W.S. Burdwan Sub Division, P.H.E. Dt ORD/001169/2023-2024 93/RWS 13/03/2024 20 GHOSH ENTERPRISE 0.79 0.79 100 100
3608 PURBA BARDHAMAN Central Mechanical AUGUMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR SHAKTIGARH , SM/16479 Augmentation Quotation for new service connection at Augmentation of Shaktigarh W/S Scheme TW-3. BILL/00372/2024-2025 BP-2024-25-184 08/07/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 4.01 0.00 0 0
3609 PURBA BARDHAMAN Central Mechanical AUGUMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR SHAKTIGARH , SM/16479 Augmentation Additional quotation for conversion of HTOH line from HT at Saktigarh (Aug) PWSS. BILL/00442/2024-2025 BP-2024-25-231 30/07/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 9.08 0.00 0 0
3610 PURBA BARDHAMAN Central Mechanical AUGUMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR SHAKTIGARH , SM/16479 Augmentation Quotation for new service connection for Shaktigarh PWSS PH-2 BILL/00294/2024-2025 BP-2024-25-183 08/07/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.48 0.00 0 0
3611 PURBA BARDHAMAN Central Mechanical AUGUMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR SHAKTIGARH , SM/16479 Augmentation Supply & Installation of Submersible Pumping Machinery , Voltage Stabilizer, Chlorination system and internal House wiring for Tube well no.- 1&2 at Augumentation of Saktigrah Water Supply Scheme under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER Junior Engineer ORD/000098/2023-2024 2587/CMD 07/06/2023 755 P.K. ENGINEERING 22.69 0.00 0 100
3612 PURBA BARDHAMAN Burdwan Division AUGUMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR SHAKTIGARH , SM/16479 Augmentation Continuation for the work of Supply of one No. Diesel Driven Car (other than Ambasader) on hire basis for the office of the Assistant Engineer, RWS Burdwan Sub-Division, PHE Dte. (Period from 01-01-2025 to 28-02-2025). ASSISTANT ENGINEER R.W.S. BURDWAN SUB-DIVISION PHE DTE Contractual Junior Engineer ORD/000995/2024-2025 413/RWS 31/12/2024 59 MD HASIN 0.79 0.00 0 0
3613 PURBA BARDHAMAN Burdwan Division AUGUMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR SHAKTIGARH , SM/16479 Augmentation Continuation for the work of Supply of one No. Diesel Driven Car (other than Ambasader) on hire basis for the office of the Assistant Engineer, RWS Burdwan Sub-Division, PHE Dte. (Period from 01-05-2025 to 30-06-2025) ASSISTANT ENGINEER R.W.S. BURDWAN SUB-DIVISION PHE DTE Contractual Junior Engineer ORD/000045/2025-2026 113/RWS 30/04/2025 61 MD HASIN 0.80 0.00 0 0
3614 PURBA BARDHAMAN Burdwan Division AUGUMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR SHAKTIGARH , SM/16479 Augmentation Upgradation of Boundary wall, Drain & land development at Head work site for SHAKTIGAR PWSS under Burdwan-Sub Div, Block-Burdwan II under Burdwan Div. PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000051/2025-2026 1425/BWD 20/05/2025 30 SARKAR AGENCY 5.39 0.00 0 0
3615 PURBA BARDHAMAN Burdwan Division AUGUMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR SHAKTIGARH , SM/16479 Augmentation Laying of inter connection between 3rd tube well site (Bhaita) and distribution system for Shaktigar PWSS within Bardhaman-II Block , under Burdwan Division, PHE Dte.Gr. No.A. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. Junior Engineer, Burdwan Sadar Sub-Division ORD/000421/2025-2026 2271/BSD 18/08/2025 30 MAA ENTERPRISE 0.96 0.00 0 100
3616 PURBA BARDHAMAN Kalna-II Burdwan Division SADHPUKHARIA PIPED WATER SUPPLY SCHEME , SM/16308 New Material Requisition To Resource Division RTOR000048/2023-2024 1962/BWD 25/04/2023 0 Resource Division 1.38 0.00 0 0
3617 PURBA BARDHAMAN Kalna-II Burdwan Division SADHPUKHARIA PIPED WATER SUPPLY SCHEME , SM/16308 New Material Requisition To Resource Division RTOR000185/2023-2024 2155/BWD 10/05/2023 0 Resource Division 15.09 0.00 0 0
3618 PURBA BARDHAMAN Kalna-II Burdwan Division SADHPUKHARIA PIPED WATER SUPPLY SCHEME , SM/16308 New Material Requisition To Resource Division RTOR000617/2023-2024 4884/BWD 10/11/2023 0 Resource Division 33.21 0.00 0 0
3619 PURBA BARDHAMAN Kalna-II Central Mechanical SADHPUKHARIA PIPED WATER SUPPLY SCHEME , SM/16308 New New service connection charges for Sadhpukuria PWSS TW-1 BILL/01488/2023-2024 BP-2023-24-185 04/10/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.37 0.00 0 0
3620 PURBA BARDHAMAN Kalna-II Central Mechanical SADHPUKHARIA PIPED WATER SUPPLY SCHEME , SM/16308 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at SADHPUKHRIA Water Supply Scheme [ Block- KALNA-2 ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. [2nd CALL] ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000864/2023-2024 4131/CMD 29/08/2023 30 SIMARR 20.64 9.28 44.96 71
3621 PURBA BARDHAMAN Kalna-II Burdwan Division SADHPUKHARIA PIPED WATER SUPPLY SCHEME , SM/16308 New Work Order for "Hiring of one no. DIESEL MOTOR CAB (BS-VI) for the Office of the Assistant Engineer, Kalna Sub-Division, Burdwan Division, P.H.E. Dte. [Period from 01.12.2023 to 31.05.2024] (Vehicle No-WB 25K 4575). Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000982/2023-2024 1680/KSD 22/11/2023 183 SUSMITA MANDAL 0.87 2.33 267.82 23
3622 PURBA BARDHAMAN Kalna-II Burdwan Division SADHPUKHARIA PIPED WATER SUPPLY SCHEME , SM/16308 New Continuation work Order for "Hiring of one no. DIESEL MOTOR CAB (BS-VI) for the Office of the Assistant Engineer, Kalna Sub-Division, Burdwan Division, P.H.E. Dte. [Period - 01.06.2024 to 30.11.2024]" (Vehicle No-WB 25K 4575) Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000461/2024-2025 273/KSD 30/05/2024 183 SUSMITA MANDAL 2.40 2.25 93.75 0
3623 PURBA BARDHAMAN Kalna-II Burdwan Division SADHPUKHARIA PIPED WATER SUPPLY SCHEME , SM/16308 New Continuation work order for "Hiring of one no. DIESEL MOTOR CAB (BS-VI) for the Office of the Assistant Engineer, Kalna Sub-Division, Burdwan Division, P.H.E. Dte. [Period from 01.12.2024 to 28.02.2025]". [Vehicle No- WB 25K 4575]. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/001066/2024-2025 1896/KSD 29/11/2024 91 SUSMITA MANDAL 1.20 1.14 95 0
3624 PURBA BARDHAMAN Kalna-II Burdwan Division SADHPUKHARIA PIPED WATER SUPPLY SCHEME , SM/16308 New Work Order for "Hiring of one no. DIESEL MOTOR CAB (BS-VI) for the Office of the Assistant Engineer, Kalna Sub-Division, Burdwan Division, P.H.E. Dte. [Period from 01.03.2025 to 31.05.2025]". [Vehicle No- 25 K 4575]. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/001243/2024-2025 316/KSD 28/02/2025 92 SUSMITA MANDAL 1.20 0.39 32.5 1
3625 PURBA BARDHAMAN Kalna-II Burdwan Division SADHPUKHARIA PIPED WATER SUPPLY SCHEME , SM/16308 New Continual work order for "Hiring of one no. DIESEL MOTOR CAB (BS-VI) for the Office of the Assistant Engineer, Kalna Sub-Division, Burdwan Division, P.H.E. Dte. [Period from 01.06.2025 to 31.08.2025]".[Vehicle No- 25 K 4575]. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000239/2025-2026 735/KSD 30/05/2025 92 SUSMITA MANDAL 1.20 0.00 0 0
3626 PURBA BARDHAMAN Kalna-II Burdwan Division SADHPUKHARIA PIPED WATER SUPPLY SCHEME , SM/16308 New Continual work order for "Hiring of one no. DIESEL MOTOR CAB (BS-VI) for the Office of the Assistant Engineer, Kalna Sub-Division, Burdwan Division, P.H.E. Dte. [Period from 01.09.2025 to 30.11.2025]". [Vehicle No- WB 25 K 4575]." Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000599/2025-2026 1441/KSD 29/08/2025 91 SUSMITA MANDAL 1.20 0.00 0 0
3627 PURBA BARDHAMAN Kalna-II Burdwan Division SADHPUKHARIA PIPED WATER SUPPLY SCHEME , SM/16308 New Continual work order for "Hiring of one no. DIESEL MOTOR CAB (BS-VI) for the Office of the Assistant Engineer, Kalna Sub-Division, Burdwan Division, P.H.E. Dte. [Period from 01.12.2025 to 28.02.2026] [Vehicle No- 25K 4575].". Assistant Engineer ORD/000797/2025-2026 1675/KSD 27/11/2025 90 SUSMITA MANDAL 1.20 0.00 0 0
3628 PURBA BARDHAMAN Raina-I Central Mechanical BAJITPUR PIPED WATER SUPPLY SCHEME , SM/16619 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at Bajitpur Water Supply Scheme [ Block- Raina-1 ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000717/2023-2024 4028/CMD 29/08/2023 30 SAIKAT ENTERPRISE 28.98 0.00 0 0
3629 PURBA BARDHAMAN Raina-I Burdwan Division BAJITPUR PIPED WATER SUPPLY SCHEME , SM/16619 New Material Requisition To Resource Division RTOR000220/2023-2024 2155/BWD 10/05/2023 0 Resource Division 11.46 0.00 0 0
3630 PURBA BARDHAMAN Raina-I Burdwan Division BAJITPUR PIPED WATER SUPPLY SCHEME , SM/16619 New Material Requisition To Resource Division RTOR000479/2023-2024 4003/BWD 08/09/2023 0 Resource Division 9.08 0.00 0 0
3631 PURBA BARDHAMAN Raina-I Burdwan Division BAJITPUR PIPED WATER SUPPLY SCHEME , SM/16619 New Material Requisition To Resource Division RTOR000647/2023-2024 5096/BWD 23/11/2023 0 Resource Division 20.46 0.00 0 0
3632 PURBA BARDHAMAN Raina-I Burdwan Division BAJITPUR PIPED WATER SUPPLY SCHEME , SM/16619 New Continuation work order for "Supply of one No. Diesel Driven Ambassador Car on hire basis for the office of the Assistant Engineer, Burdwan Sub-Division, PHE Dte. (Period from 01-09-2024 to 30-11-2024 Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000682/2024-2025 1957/BSD 30/08/2024 91 SK. ASFIA 1.20 0.34 28.33 60
3633 PURBA BARDHAMAN Raina-I Central Mechanical BAJITPUR PIPED WATER SUPPLY SCHEME , SM/16619 New New electric connection for Bajitpur PWSS, PH-1. BILL/01887/2023-2024 BP-2023-24-358 11/01/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 5.31 0.00 0 0
3634 PURBA BARDHAMAN Raina-I Burdwan Division BAJITPUR PIPED WATER SUPPLY SCHEME , SM/16619 New Different works related (sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of different capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site) to BAJITPUR, SHUKUR & HARISHNAPUR Piped Water Supply Scheme under RAINA-I Block, District:- Purba Bardhaman [NEW SCHEME] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000388/2023-2024 3197/BWD 24/07/2023 365 MRITYUNJOY MUKHERJEE & CO. 1,242.03 54.78 4.41 55
3635 PURBA BARDHAMAN Raina-I Burdwan Division BAJITPUR PIPED WATER SUPPLY SCHEME , SM/16619 New Continuation Work Order for Supply of one No.Diesel Driven Ambassador Car No. WB:41H-4009 on hire basis for the office of the Assistant Engineer,Burdwan Sub-Division,PHE Dte (Period from 01-06-2025 to 31.08.2025) JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000180/2025-2026 1260/BSD 30/05/2025 92 SK. ASFIA 1.20 0.00 0 60
3636 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR NATUNGRAM , SM/15753 Augmentation Preparation and Submission of DPR for Augmentation of Natungram PWSS under Burdwan-I Development Block under Burdwan Division, P.H.E Dte.[2nd Call] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000347/2023-2024 1474/BSD 12/07/2023 15 MEASURE LAND 0.78 0.77 98.72 100
3637 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR NATUNGRAM , SM/15753 Augmentation Augmentation of NATUNGRAM Piped Water Supply Scheme Construction of 200 cum capacity RCC OHR with 20.0 mtr. with Staging height including soil investigation & Rising Main under BARDHAMAN-I Block, District:- Purba-Bardhaman. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000579/2023-2024 3726/BWD 25/08/2023 365 BASU ENTERPRISE 72.82 37.76 51.85 40
3638 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR NATUNGRAM , SM/15753 Augmentation Conducting physical Household Survey at the IMIS reported village for HGJ certification and providing balance FHTC for Har Ghar Jal certification including conducting Gram Sabhas for different IMIS reported villages across the district under Burdwan Division, PHE Dte. AE(HQs),Assistant Engineer ,Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE.,Assistant Engineer, Durgapur Sub Division, P.H.E. Dte JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000428/2024-2025 3107/BWD 12/08/2024 323 TUBGRAM GRAMMYAK UNNAYAN SAMITY 309.60 0.00 0 85
3639 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR NATUNGRAM , SM/15753 Augmentation Providing leftout FHTC with extension of Pipeline, construction of Pathway, drain, repairing of Pump House at Head Work site with allied works for NATUNGRAM and KHETIA Piped Water Supply Scheme, Block-Burdwan-I, within Burdwan Sub Division under Burdwan Division PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JE (RWS) Burdwan-I Block ORD/001003/2024-2025 007/BWD 02/01/2025 211 M/S UNIQUE 33.59 0.00 0 80
3640 PURBA BARDHAMAN Khandaghosh Burdwan Division SASANGA PIPED WATER SUPPLY SCHEME , SM/18245 New Material Requisition To Resource Division RTOR000296/2023-2024 2197/BWD 12/05/2023 0 Resource Division 6.45 0.00 0 0
3641 PURBA BARDHAMAN Khandaghosh Burdwan Division SASANGA PIPED WATER SUPPLY SCHEME , SM/18245 New Material Requisition To Resource Division RTOR000405/2023-2024 3827/BWD 01/09/2023 0 Resource Division 17.67 0.00 0 0
3642 PURBA BARDHAMAN Khandaghosh Burdwan Division SASANGA PIPED WATER SUPPLY SCHEME , SM/18245 New Material Requisition To Resource Division RTOR000574/2023-2024 4923/BWD 10/11/2023 0 Resource Division 41.11 0.00 0 0
3643 PURBA BARDHAMAN Khandaghosh Central Mechanical SASANGA PIPED WATER SUPPLY SCHEME , SM/18245 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1, 2 & 3 at SASANGA Water Supply Scheme [ Block-KHONDOGHOSH ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER Junior Engineer ORD/000921/2023-2024 4185/CMD 29/08/2023 30 P.K. ENGINEERING 45.37 24.01 52.92 90
3644 PURBA BARDHAMAN Khandaghosh Central Mechanical SASANGA PIPED WATER SUPPLY SCHEME , SM/18245 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at BICHKHARA & others water supply scheme under Khandoghosh Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman ASSISTANT ENGINEER Junior Engineer ORD/000064/2024-2025 2390/CMD 02/08/2024 90 MS DAS ELECTRIC CO 46.54 0.00 0 0
3645 PURBA BARDHAMAN Khandaghosh Burdwan Division SASANGA PIPED WATER SUPPLY SCHEME , SM/18245 New Material Requisition To Resource Division RTOR000005/2024-2025 4116/BWD 25/11/2024 0 Resource Division 22.79 0.00 0 0
3646 PURBA BARDHAMAN Khandaghosh Central Mechanical SASANGA PIPED WATER SUPPLY SCHEME , SM/18245 New Quotation for new service connection for Sasanga PWSS PH 2. BILL/00229/2024-2025 BP-2024-25-120 29/05/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 6.09 0.00 0 0
3647 PURBA BARDHAMAN Khandaghosh Central Mechanical SASANGA PIPED WATER SUPPLY SCHEME , SM/18245 New New service connection charges for Sasanga PWSS TW-2 BILL/02210/2023-2024 BP-2023-24-401 17/01/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 2.50 0.00 0 0
3648 PURBA BARDHAMAN Khandaghosh Central Mechanical SASANGA PIPED WATER SUPPLY SCHEME , SM/18245 New New service connection charges for Sasanga PWSS TW-1 BILL/02209/2023-2024 BP-2023-24-400 17/01/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.46 0.00 0 0
3649 PURBA BARDHAMAN Khandaghosh Burdwan Division SASANGA PIPED WATER SUPPLY SCHEME , SM/18245 New Different works related (sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of different capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site) to ONARI & SASANGA Piped Water Supply Scheme under Khandaghosh Block, District:- Purba-Bardhaman [NEW SCHEME]_2ND CALL Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000452/2023-2024 3430/BWD 07/08/2023 786 M/S JAN MAHAMMAD 1,398.82 486.11 34.75 50
3650 PURBA BARDHAMAN Khandaghosh Burdwan Division SASANGA PIPED WATER SUPPLY SCHEME , SM/18245 New Field level data validation of FHTC executed by Agencies on the basis of pictorial data with the objective of controlling multiple entry,improving data quality in terms of absolute household by verification through electric connection or any other unique documents and making error free database of SASANGA Pipe Water Supply Scheme in Khandaghosh Block within Burdwan Sub-Division under Burdwan Division,PHE Dte JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000894/2024-2025 2673/BSD 04/12/2024 30 TECHVISION 1.48 0.00 0 100
3651 PURBA BARDHAMAN Khandaghosh Burdwan Division SASANGA PIPED WATER SUPPLY SCHEME , SM/18245 New Continuation Work Order for supply of inspection Vehicle for inspection of different JJM related (schemes) works as and when required including supply of driver & fuel(minimum 8 hours duty per day) and all taxes etc. for Burdwan Sub-Division under Burdwan Division,PHE Dte consider 96.00 Km. run per day (Period from 01-08-2025 to 31-10-2025) JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000703/2025-2026 2019/BSD 31/07/2025 66 PARVIN BEGAM 0.85 0.00 0 0
3652 PURBA BARDHAMAN Khandaghosh Central Mechanical SULTANPUR PIPED WATER SUPPLY SCHEME , SM/18607 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at Sultanpur Water Supply Scheme [ Block- Khandogosh ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER Junior Engineer ORD/000707/2023-2024 4018/CMD 29/08/2023 30 SUBRATA BHADRA 28.96 0.00 0 0
3653 PURBA BARDHAMAN Khandaghosh Burdwan Division SULTANPUR PIPED WATER SUPPLY SCHEME , SM/18607 New Material Requisition To Resource Division RTOR000695/2023-2024 5071/BWD 23/11/2023 0 Resource Division 20.46 0.00 0 0
3654 PURBA BARDHAMAN Khandaghosh Burdwan Division SULTANPUR PIPED WATER SUPPLY SCHEME , SM/18607 New Material Requisition To Resource Division RTOR000327/2023-2024 2197/BWD 12/05/2023 0 Resource Division 17.55 0.00 0 0
3655 PURBA BARDHAMAN Khandaghosh Burdwan Division SULTANPUR PIPED WATER SUPPLY SCHEME , SM/18607 New Material Requisition To Resource Division RTOR000522/2023-2024 4301/BWD 29/09/2023 0 Resource Division 6.53 0.00 0 0
3656 PURBA BARDHAMAN Khandaghosh Burdwan Division SULTANPUR PIPED WATER SUPPLY SCHEME , SM/18607 New Land demarcation and preparation of sketch map for Haldi, Sultanpur, Berugram & Karail Piped W/S. Scheme (New Scheme) at different Blocks under JJM under Burdwan Division, PHE Dte. AE(HQs) J.E. 1 BURDWAN ORD/000756/2023-2024 842/AE/HQ 01/11/2023 15 M/S S. CHOUDHURY 0.33 0.00 0 100
3657 PURBA BARDHAMAN Khandaghosh Central Mechanical SULTANPUR PIPED WATER SUPPLY SCHEME , SM/18607 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at BICHKHARA & others water supply scheme under Khandoghosh Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman ASSISTANT ENGINEER Junior Engineer ORD/000064/2024-2025 2390/CMD 02/08/2024 90 MS DAS ELECTRIC CO 46.54 0.00 0 0
3658 PURBA BARDHAMAN Khandaghosh Central Mechanical SULTANPUR PIPED WATER SUPPLY SCHEME , SM/18607 New Quotation for new service connection at SULTANPUR W/S Scheme PH-I. BILL/01812/2023-2024 BP-2023-24-324 30/12/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.49 0.00 0 0
3659 PURBA BARDHAMAN Khandaghosh Burdwan Division SULTANPUR PIPED WATER SUPPLY SCHEME , SM/18607 New Different works related (sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of different capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site) to BERUGRAM & SULTANPUR Piped Water Supply Scheme under Khandaghosh Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer ORD/000979/2023-2024 092/BWD 05/01/2024 604 SK ALIM 1,368.51 317.88 23.23 55
3660 PURBA BARDHAMAN Khandaghosh Burdwan Division SULTANPUR PIPED WATER SUPPLY SCHEME , SM/18607 New Balance work of BERUGRAM & SULTANPUR Piped Water Supply Scheme with sinking of Tube-well, LDS, FHTC & construction of switch rooms & boundary walls with gates and land development, drain and internal pathway at different TW site under Khandaghosh Block, District:- Purba-Bardhaman. Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/001214/2024-2025 723/BWD 24/02/2025 180 MD HASIN 438.83 0.00 0 0
3661 PURBA BARDHAMAN Memari-I Burdwan Division SANUI PIPED WATER SUPPLY SCHEME , SM/18610 New Material Requisition To Resource Division RTOR000434/2023-2024 3852/BWD 01/09/2023 0 Resource Division 13.05 0.00 0 0
3662 PURBA BARDHAMAN Memari-I Burdwan Division SANUI PIPED WATER SUPPLY SCHEME , SM/18610 New Material Requisition To Resource Division RTOR000284/2023-2024 2197/BWD 12/05/2023 0 Resource Division 8.15 0.00 0 0
3663 PURBA BARDHAMAN Memari-I Burdwan Division SANUI PIPED WATER SUPPLY SCHEME , SM/18610 New Material Requisition To Resource Division RTOR000573/2023-2024 4943/BWD 10/11/2023 0 Resource Division 41.11 0.00 0 0
3664 PURBA BARDHAMAN Memari-I Burdwan Division SANUI PIPED WATER SUPPLY SCHEME , SM/18610 New Continuation work order for "Supply of one No. Diesel Driven Ambassador Car on hire basis for the office of the Assistant Engineer, Burdwan Sub-Division, PHE Dte. (Period from 01-06-2024 to 31-08-2024" JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000228/2024-2025 918/BSD 28/05/2024 92 SK. ASFIA 1.20 0.80 66.67 60
3665 PURBA BARDHAMAN Memari-I Central Mechanical SANUI PIPED WATER SUPPLY SCHEME , SM/18610 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at SAHAPUR & others water supply scheme under Memari-I Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. ASSISTANT ENGINEER Junior Engineer ORD/000100/2024-2025 2392/CMD 02/08/2024 90 MITRA ENTERPRISE 47.62 0.00 0 0
3666 PURBA BARDHAMAN Memari-I Burdwan Division SANUI PIPED WATER SUPPLY SCHEME , SM/18610 New Material Requisition To Resource Division RTOR000017/2024-2025 4107/BWD 25/11/2024 0 Resource Division 15.04 0.00 0 0
3667 PURBA BARDHAMAN Memari-I Central Mechanical SANUI PIPED WATER SUPPLY SCHEME , SM/18610 New New service connection for Sanui W/S Scheme. BILL/02186/2023-2024 BP-2023-24-380 16/01/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 15.93 0.00 0 0
3668 PURBA BARDHAMAN Memari-I Central Mechanical SANUI PIPED WATER SUPPLY SCHEME , SM/18610 New New service connection for Sanui W/S Scheme. BILL/02185/2023-2024 BP-2023-24-381 16/01/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 5.95 0.00 0 0
3669 PURBA BARDHAMAN Memari-I Burdwan Division SANUI PIPED WATER SUPPLY SCHEME , SM/18610 New SANUI Piped Water Supply Scheme with sinking of Tube-well, LDS, Rising Main, FHTC, Construction of 500 cum capacity RCC OHR with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drain and internal pathway at different TW site under Memari-I Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000503/2023-2024 3536/BWD 10/08/2023 783 M/S ASHA CONSTRUCTION 825.12 238.99 28.96 35
3670 PURBA BARDHAMAN Memari-I Central Mechanical SANUI PIPED WATER SUPPLY SCHEME , SM/18610 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1, 2 & 3 at SANUI Water Supply Scheme [ Block- MEMARI-1 ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER Junior Engineer ORD/000785/2023-2024 4077/CMD 29/08/2023 672 JAL PRAVAHIKA PVT LTD 44.08 0.00 0 70
3671 PURBA BARDHAMAN Memari-I Burdwan Division SANUI PIPED WATER SUPPLY SCHEME , SM/18610 New Restoration of Conc. road, Providing leftout FHTC with extension of Pipeline, construction of Pathway, drain, repairing of Pump House at Head Work site with allied works for MAGRA, SANUI, SATGACHIA Zone-I & NARAGOHALIA PIPED WATER SUPPLY SCHEME, Block-Memari-I, within Burdwan Sub Division under Burdwan Division PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/001192/2024-2025 611/BWD 11/02/2025 180 M/S ASHA CONSTRUCTION 354.13 0.00 0 25
3672 PURBA BARDHAMAN Mangolkote Burdwan Division PALISGRAM PIPE WATER SUPPLY SCHEME , SM/18481 New Material Requisition To Resource Division RTOR000360/2023-2024 2197/BWD 12/05/2023 0 Resource Division 2.93 0.00 0 0
3673 PURBA BARDHAMAN Mangolkote Burdwan Division PALISGRAM PIPE WATER SUPPLY SCHEME , SM/18481 New Material Requisition To Resource Division RTOR000567/2023-2024 4939/BWD 10/11/2023 0 Resource Division 27.80 0.00 0 0
3674 PURBA BARDHAMAN Mangolkote Burdwan Division PALISGRAM PIPE WATER SUPPLY SCHEME , SM/18481 New Material Requisition To Resource Division RTOR000529/2023-2024 4304/BWD 29/09/2023 0 Resource Division 1.53 0.00 0 0
3675 PURBA BARDHAMAN Mangolkote Central Mechanical PALISGRAM PIPE WATER SUPPLY SCHEME , SM/18481 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1, 2 & 3 at PALISGRAM Water Supply Scheme [ Block-MANGOLKOTE] under CMD, PHE Dte., Dist.- Purba-Bardhaman. Driller In-Charge Junior Engineer ORD/000870/2023-2024 4133/CMD 29/08/2023 30 CHOUDHURY ENTERPRISE 44.62 24.76 55.49 63
3676 PURBA BARDHAMAN Mangolkote Burdwan Division PALISGRAM PIPE WATER SUPPLY SCHEME , SM/18481 New Material Requisition To Resource Division RTOR000010/2024-2025 4114/BWD 25/11/2024 0 Resource Division 17.51 0.00 0 0
3677 PURBA BARDHAMAN Mangolkote Central Mechanical PALISGRAM PIPE WATER SUPPLY SCHEME , SM/18481 New NEW SERVICE CONNECTION FOR PALISHGRAM PH -2 PWSS. BILL/00007/2024-2025 BP-2024-25-3 04/04/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 2.87 0.00 0 0
3678 PURBA BARDHAMAN Mangolkote Central Mechanical PALISGRAM PIPE WATER SUPPLY SCHEME , SM/18481 New NEW SERVICE CONNECTION FOR PALISHGRAM PWSS. BILL/00006/2024-2025 BP-2024-25-2 04/04/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 4.96 0.00 0 0
3679 PURBA BARDHAMAN Mangolkote Central Mechanical PALISGRAM PIPE WATER SUPPLY SCHEME , SM/18481 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Lakshimpur & others water supply scheme under Mangalkote Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman Driller In-Charge Junior Engineer ORD/000097/2024-2025 2406/CMD 02/08/2024 290 CHOUDHURY ENTERPRISE 57.65 0.00 0 10
3680 PURBA BARDHAMAN Mangolkote Burdwan Division PALISGRAM PIPE WATER SUPPLY SCHEME , SM/18481 New Different works related (sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of different capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site) to PALISGRAM, PURBA NAYAPARA & SITAHATI Piped Water Supply Scheme under MONGALKOTE Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer JUNIOR ENGINEER KATWA SUB-DIVISION PHE DTE,JUNIOR ENGINEER R.W.S. BURDWAN SUB-DIVISION PHE DTE ORD/000695/2023-2024 4364/BWD 04/10/2023 910 M/S S. CHOUDHURY 1,505.07 68.35 4.54 77
3681 PURBA BARDHAMAN Mangolkote Burdwan Division PALISGRAM PIPE WATER SUPPLY SCHEME , SM/18481 New Different types of works involve in connection with implementation of Aug. Mongalkote, Palishgram, Purba Nowapara, Sitahati, Singhi, Mejhiary & Karui Piped Water Supply Scheme within Katwa Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer ORD/001191/2024-2025 873/BWD 06/03/2025 180 M/S S. CHOUDHURY 588.22 0.00 0 0
3682 PURBA BARDHAMAN Katwa-I Burdwan Division GIDHGRAM PIPED WATER SUPPLY SCHEME , SM/18485 New Material Requisition To Resource Division RTOR000265/2023-2024 2197/BWD 12/05/2023 0 Resource Division 16.31 0.00 0 0
3683 PURBA BARDHAMAN Katwa-I Burdwan Division GIDHGRAM PIPED WATER SUPPLY SCHEME , SM/18485 New Material Requisition To Resource Division RTOR000491/2023-2024 4015/BWD 08/09/2023 0 Resource Division 74.64 0.00 0 0
3684 PURBA BARDHAMAN Katwa-I Burdwan Division GIDHGRAM PIPED WATER SUPPLY SCHEME , SM/18485 New Balance work for Balance work of OHR, construction Concrete Road, 1st Floor of Office Building, Functional Household Tap Connection, land development, Road restoration etc. of Gopekhanji, Jajigram & Gidhagram PWSS under KATWA -I Block, under Katwa Sub Division under Burdwan Divn, District:- Purba-Bardhaman. Assistant Engineer ORD/000503/2024-2025 3161/BWD 22/08/2024 120 POWER TOOLS & ENGINEERING 272.54 0.00 0 0
3685 PURBA BARDHAMAN Katwa-I Central Mechanical GIDHGRAM PIPED WATER SUPPLY SCHEME , SM/18485 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Jajigram & others water supply scheme under Katwa-I Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman Driller In-Charge Junior Engineer ORD/000069/2024-2025 2399/CMD 02/08/2024 90 SUBRATA BHADRA 55.16 0.00 0 0
3686 PURBA BARDHAMAN Katwa-I Central Mechanical GIDHGRAM PIPED WATER SUPPLY SCHEME , SM/18485 New New service connection for Gidhagram PWSS PH-3 BILL/02283/2023-2024 BP-2023-24-420 19/01/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.90 0.00 0 0
3687 PURBA BARDHAMAN Katwa-I Central Mechanical GIDHGRAM PIPED WATER SUPPLY SCHEME , SM/18485 New NEW SERVICE CONNECTION FOR GIDHGRAM PWSS TW 1 BILL/02955/2023-2024 BP-2023-24-635 15/03/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.48 0.00 0 0
3688 PURBA BARDHAMAN Katwa-I Central Mechanical GIDHGRAM PIPED WATER SUPPLY SCHEME , SM/18485 New Quotation for new service connection at Gidhgram PWSS TW 3. BILL/01223/2024-2025 BP-2024-25-413 16/12/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 0.54 0.00 0 0
3689 PURBA BARDHAMAN Katwa-I Central Mechanical GIDHGRAM PIPED WATER SUPPLY SCHEME , SM/18485 New NEW SERVICE CONNECTION FOR GIDHGRAM PWSS TW 2. BILL/02488/2023-2024 BP-2023-24-534 15/02/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 5.91 0.00 0 0
3690 PURBA BARDHAMAN Katwa-I Burdwan Division GIDHGRAM PIPED WATER SUPPLY SCHEME , SM/18485 New GIDHGRAM Piped Water Supply Scheme with sinking of Tube-well, LDS, Rising Main, FHTC, Construction of 500cum capacity RCC OHR with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drain and internal pathway at different TW site under Katwa-I Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer JUNIOR ENGINEER KATWA SUB-DIVISION PHE DTE,Junior Engineer, R.W.S., Katwa-I Dev. Block ORD/000453/2023-2024 3431/BWD 07/08/2023 786 POWER TOOLS & ENGINEERING 671.42 310.97 46.32 31
3691 PURBA BARDHAMAN Katwa-I Central Mechanical GIDHGRAM PIPED WATER SUPPLY SCHEME , SM/18485 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1, 2 & 3 at GIDHGRAM Water Supply Scheme [ Block-KATWA-1 ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. Driller In-Charge Junior Engineer ORD/000873/2023-2024 4136/CMD 29/08/2023 605 M/S, S.S. ENTERPRISE. 45.53 23.87 52.43 64
3692 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting at Dhoba and Goalpara Mouzas of Nasratpur PWSS , SM/06745 Retrofitting Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of NASARATPUR Piped Water Supply Scheme at Purbasthali-I Block under Burdwan Division, PHE Dte._2ND CALL. AE(HQs) J.E. 2 BURDWAN ORD/000174/2021-2022 6079/BWD 08/10/2021 60 BRINDABAN KONAR 54.89 48.84 88.98 1
3693 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting at Dhoba and Goalpara Mouzas of Nasratpur PWSS , SM/06745 Retrofitting Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of NASARATPUR Piped Water Supply Scheme at Gopinathpur (Part), Nasaratput (Part) & Paruldanga (Part) Village (Mouza), Purbasthali - I Block under Burdwan Division, PHE Dte Assistant Engineer ORD/000372/2021-2022 211/BWD 11/01/2022 60 KHEPIMA ENGINEERS CO. OPERATIVE SOCIETY LTD. 76.77 15.16 19.75 1
3694 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting at Dhoba and Goalpara Mouzas of Nasratpur PWSS , SM/06745 Retrofitting Work order for Repairing of leakage of existing pipe line of Nasaratpur habitation of Purbasthali-I Block within Kalna Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000124/2023-2024 419/KSD 11/05/2023 30 PARTHA PRATIM ACHARYA 0.97 0.72 74.23 50
3695 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting at Dhoba and Goalpara Mouzas of Nasratpur PWSS , SM/06745 Retrofitting Restoration work of Kalna baidyapur road from 7.90 km to 13.75 km (in stretches) damaged due to laying of underground water pipe line by PHE with box cutting and Jhama with moorum consolidation under Kalna Highway Sub-Division of Burdwan South Highway Division, P.W (Roads) Dte. during the year 2023-2024. BILL/00890/2024-2025 1025/JJM 05/10/2024 0 EXECUTIVE ENGINEER BURDWAN SOUTH HIGHWAY DIVISION P.W. (ROADS) DTE. 8.10 0.00 0 0
3696 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting at Dhoba and Goalpara Mouzas of Nasratpur PWSS , SM/06745 Retrofitting Restoration work of Kulti Haritala to Jamna Bus stand via Krishnapur, Baharkuli,Sargoria road from 3.15 km to 5.70 km, damaged due to laying of underground water pipe line by PHE with box cutting and Jhama with moorum consolidation under Kalna Highway Sub Division of Burdwan South Highway Division, P.W(Roads) Dte. during the year 2023-24. BILL/00891/2024-2025 1025/JJM 05/10/2024 0 EXECUTIVE ENGINEER BURDWAN SOUTH HIGHWAY DIVISION P.W. (ROADS) DTE. 5.36 0.00 0 0
3697 PURBA BARDHAMAN Mangolkote Burdwan Division SIMULIA PIPE WATER SUPPLY SCHEME , SM/18459 New Material Requisition To Resource Division RTOR000323/2023-2024 2197/BWD 12/05/2023 0 Resource Division 18.62 0.00 0 0
3698 PURBA BARDHAMAN Mangolkote Burdwan Division SIMULIA PIPE WATER SUPPLY SCHEME , SM/18459 New Material Requisition To Resource Division RTOR000528/2023-2024 4303/BWD 29/09/2023 0 Resource Division 4.13 0.00 0 0
3699 PURBA BARDHAMAN Mangolkote Burdwan Division SIMULIA PIPE WATER SUPPLY SCHEME , SM/18459 New Material Requisition To Resource Division RTOR000809/2023-2024 307/BWD 24/01/2024 0 Resource Division 32.21 0.00 0 0
3700 PURBA BARDHAMAN Mangolkote Central Mechanical SIMULIA PIPE WATER SUPPLY SCHEME , SM/18459 New New service connection charges for Shimulia PWSS TW-1 BILL/02197/2023-2024 BP-2023-24-376 16/01/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.42 0.00 0 0
3701 PURBA BARDHAMAN Mangolkote Central Mechanical SIMULIA PIPE WATER SUPPLY SCHEME , SM/18459 New New service connection charges for Simulia PWSS TW-2 BILL/02196/2023-2024 BP-2023-24-377 16/01/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.22 0.00 0 0
3702 PURBA BARDHAMAN Mangolkote Central Mechanical SIMULIA PIPE WATER SUPPLY SCHEME , SM/18459 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1, 2 & 3 at SIMULIA Water Supply Scheme [ Block- MONGOLKOTE ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. Driller In-Charge Junior Engineer ORD/000796/2023-2024 4084/CMD 29/08/2023 610 P.K. ENGINEERING 41.62 0.00 0 31
3703 PURBA BARDHAMAN Mangolkote Burdwan Division SIMULIA PIPE WATER SUPPLY SCHEME , SM/18459 New Different works related (sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of different capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site) to SIMULIA & LAKSHIMPUR Piped Water Supply Scheme under Mongalkote Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer JUNIOR ENGINEER R.W.S. BURDWAN SUB-DIVISION PHE DTE ORD/000694/2023-2024 4363/BWD 04/10/2023 727 PUSPA ENTERPRISE 1,090.95 278.65 25.54 37
3704 PURBA BARDHAMAN Mangolkote Central Mechanical SIMULIA PIPE WATER SUPPLY SCHEME , SM/18459 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Lakshimpur & others water supply scheme under Mangalkote Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman Driller In-Charge Junior Engineer ORD/000097/2024-2025 2406/CMD 02/08/2024 290 CHOUDHURY ENTERPRISE 57.65 0.00 0 10
3705 PURBA BARDHAMAN Mangolkote Burdwan Division SIMULIA PIPE WATER SUPPLY SCHEME , SM/18459 New Different types of works involve in connection with implementation of Gohgram, Jabagram, Kherua, Lakshmipur & Simulia Piped Water Supply Scheme under Mongolkote Block within Katwa Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer ORD/001301/2024-2025 936/BWD 11/03/2025 180 M/S GHOSH CONSTRUCTION 360.68 0.00 0 0
3706 PURBA BARDHAMAN Burdwan Division Retrofitting wroks for Providing Functional Household Tap Connection (FHTC) within the command area of of Srirampur Piped Water Supply Scheme, Purbasthali-I, Purba Bardhaman , SM/08103 Retrofitting Sinking of 250 X 150mm dia Tube Well 150 mtr. Depth by D.R. Rig method using UPVC pipe (CM) and UPVC Deep Well Screen (RMS) for 1ST TW Site of SRIRAMPUR & its adjoining mouzas Piped Water Supply Scheme, Block ? Purbasthali ? I, Dist - Purba Bardhaman under Burdwan Division, PHE Dte. Assistant Engineer ORD/000548/2022-2023 5127/BWD 21/11/2022 30 M/S SYCHROTECH INDUSTRY 8.73 0.00 0 0
3707 PURBA BARDHAMAN Burdwan Division Retrofitting wroks for Providing Functional Household Tap Connection (FHTC) within the command area of of Srirampur Piped Water Supply Scheme, Purbasthali-I, Purba Bardhaman , SM/08103 Retrofitting Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of Srirampur Piped Water Supply Scheme at Srirampur (Srirampur & Srirampur East Para Habitation) Village (Mouza), Purbasthali-I Block under Burdwan Division, PHE Dte. Assistant Engineer ORD/000091/2021-2022 3654/BWD 14/07/2021 60 ASHOK KUMAR GHOSH 102.42 84.00 82.02 1
3708 PURBA BARDHAMAN Burdwan Division Retrofitting wroks for Providing Functional Household Tap Connection (FHTC) within the command area of of Srirampur Piped Water Supply Scheme, Purbasthali-I, Purba Bardhaman , SM/08103 Retrofitting Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of Srirampur Piped Water Supply Scheme at Srirampur Northpara, Srirampur Southpara & Srirampur Westpara within Srirampur (P) Village (Mouza), Purbasthali-I Block under Burdwan Division, PHE Dte. Assistant Engineer ORD/000283/2021-2022 7002/BWD 16/12/2021 60 HAMID SK 71.23 70.84 99.45 1
3709 PURBA BARDHAMAN Burdwan Division Retrofitting wroks for Providing Functional Household Tap Connection (FHTC) within the command area of of Srirampur Piped Water Supply Scheme, Purbasthali-I, Purba Bardhaman , SM/08103 Retrofitting Bypass arrangement of rising main and providing Functional house hold tap connections at Srirampur GP within Purbasthali-I Block under SRIRAMPUR PWSS under Burdwan Division, PHE Dte. Assistant Engineer ORD/000715/2022-2023 889/BWD 01/03/2023 30 JAMALUDDIN SK 13.01 12.88 99 0
3710 PURBA BARDHAMAN Burdwan Division Retrofitting wroks for Providing Functional Household Tap Connection (FHTC) within the command area of of Srirampur Piped Water Supply Scheme, Purbasthali-I, Purba Bardhaman , SM/08103 Retrofitting Work order for " Providing Functional house hold tap connections for Sajal Gram Village within Purbasthali-I Block under Kalna Sub-Division under Burdwan Division, PHE Dte. (Nadanghat & others scheme) Sl No-7" Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000690/2022-2023 103/KSD 08/02/2023 28 MOMINUL ISLAM MONDAL 0.88 0.00 0 0
3711 PURBA BARDHAMAN Burdwan Division Retrofitting wroks for Providing Functional Household Tap Connection (FHTC) within the command area of of Srirampur Piped Water Supply Scheme, Purbasthali-I, Purba Bardhaman , SM/08103 Retrofitting Laying of additional UPVC pipeline for interconnection with main line to branch line of SRIRAMPUR Water Supply Scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000710/2023-2024 4522/BWD 12/10/2023 30 JAMALUDDIN SK 6.16 5.78 93.83 100
3712 PURBA BARDHAMAN Burdwan Division Retrofitting wroks for Providing Functional Household Tap Connection (FHTC) within the command area of of Srirampur Piped Water Supply Scheme, Purbasthali-I, Purba Bardhaman , SM/08103 Retrofitting NAME OF THE WORK -RESTORATION WORK OF BIDYANAGAR TO VIA DAMODAR PARA TO BOGPUR ROAD,PACKAGE NO-WB-22-27,BLOCK-PURBASTHALI-1,GP-SRIRAMPUR & JAHANNAGAR. BILL/00739/2024-2025 893/JJM 25/09/2024 0 EXECUTIVE ENGINEER (WBSRDA) PURBA BARDHAMAN DIVISION 5.21 0.00 0 0
3713 PURBA BARDHAMAN Burdwan Division Retrofitting wroks for Providing Functional Household Tap Connection (FHTC) within the command area of of Srirampur Piped Water Supply Scheme, Purbasthali-I, Purba Bardhaman , SM/08103 Retrofitting Different types of works involve in connection with Augmentation of SRIRAMPUR (Zone I & II) (SM/08103), MANGANPUR (SM/13327), KAMALPUR (SM/13453) Piped Water Supply Scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000190/2024-2025 2429/BWD 27/06/2024 480 S.P. CONSTRUCTION 500.89 128.67 25.69 2
3714 PURBA BARDHAMAN Burdwan Division Providing Functional House Hold Tap Connection (FHTC) by retrofitting within the command area of Sahapurr Piped Water Supply Scheme , SM/07201 Retrofitting Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Sahapur (Pt-A) village of Sahapur Piped Water Supply Scheme within Katwa Sub-Divn. under Burdwan Division, PHE. Dte. [Phase - I] [SL.No : 11A] (Agreement no. 500/BWD of 2020-21) Assistant Engineer ORD/000143/2020-2021 2608/BWD 04/08/2020 30 RAINBOW CONSTRUCTION 4.92 9.84 200 1
3715 PURBA BARDHAMAN Burdwan Division Providing Functional House Hold Tap Connection (FHTC) by retrofitting within the command area of Sahapurr Piped Water Supply Scheme , SM/07201 Retrofitting Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Sahapur (Pt-A) village of Sahapur Piped Water Supply Scheme within Katwa Sub-Divn. under Burdwan Division, PHE. Dte. [Phase - I] [SL.No : 11A] (Agreement no.505/BWD of 2020-21) Assistant Engineer ORD/000144/2020-2021 2607/BWD 04/08/2020 30 DUBE ENTERPRISE 4.92 9.84 200 1
3716 PURBA BARDHAMAN Burdwan Division Providing Functional House Hold Tap Connection (FHTC) by retrofitting within the command area of Sahapurr Piped Water Supply Scheme , SM/07201 Retrofitting Continuation work order for Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Sahapur (Pt-B) village of Sahapur Piped Water Supply Scheme within Katwa Sub-Divn. under Burdwan Division, PHE. Dte. [Phase - I] [SL.No : ¿11B¿](Agreement no.-497/BWD of 2020-21) Assistant Engineer ORD/000146/2020-2021 4913/BWD 08/12/2020 30 DUBE ENTERPRISE 2.84 0.00 0 1
3717 PURBA BARDHAMAN Burdwan Division Providing Functional House Hold Tap Connection (FHTC) by retrofitting within the command area of Sahapurr Piped Water Supply Scheme , SM/07201 Retrofitting Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Sahapur (Part-A) village of Sahapur piped water supply scheme within Katwa Sub-Division under Burdwan Division, PHE Dte. [Phase-I](Tr No.-503/BWD/20-21) Assistant Engineer ORD/000176/2020-2021 238/KTS 30/09/2020 4 RAINBOW CONSTRUCTION 1.45 2.89 199.31 1
3718 PURBA BARDHAMAN Burdwan Division Providing Functional House Hold Tap Connection (FHTC) by retrofitting within the command area of Sahapurr Piped Water Supply Scheme , SM/07201 Retrofitting Water tap connection in each house hold from existing distribution system within scheme jurisdiction in SAHAPUR (Part-B) village of Sahapur piped water supply scheme within Katwa Sub-Division under Burdwan Division, PHE Dte. [Phase-I](Tr No.-494/BWD/2020-21) Assistant Engineer ORD/000174/2020-2021 239/KTS 30/09/2020 4 DUBE ENTERPRISE 1.42 2.82 198.59 1
3719 PURBA BARDHAMAN Burdwan Division Providing Functional House Hold Tap Connection (FHTC) by retrofitting within the command area of Sahapurr Piped Water Supply Scheme , SM/07201 Retrofitting Publication charges bill for the office of the Executive Engineer, Burdwan Division, PHE Dte.[Invoice No.-BCWB20RV-0001293, dt.-19/05/20, BCWB20RV-0001770, dt.-31/05/20, BCWB20RV-0001920, dt.-05/06/20, BCWB20RV-0001860, dt.-03/06/20, BCWB20RV-0001861, dt.-03/06/20, BCWB20RV-0001928, dt.-05/06/20, BCWB20RV-0001820, dt.-03/06/20, BCWB19RV-0059455, dt.-20/03/20, BCWB19RV-0059454. dt.-20/03/20, BCWB19RV-0057682, dt.-12/03/20, BCWB20RV-0003210, dt.-26/06/20, BCWB20RV-0000918, dt.-07/05/20, BCWB20RV-0001352, dt.-22/05/20, BCWB19RV-0050592, dt.-30/01/20] VCH/000411/2022-2023 240/DW/22-23 04/07/2022 0 BENNETT COLEMAN & COMPANY LIMITED 1.89 0.00 0 0
3720 PURBA BARDHAMAN Burdwan Division Providing Functional House Hold Tap Connection (FHTC) by retrofitting within the command area of Sahapurr Piped Water Supply Scheme , SM/07201 Retrofitting Hire & fuel charges of vehicle (Car No.-WB-04G-7127) for the month of May & June'23. BILL/00791/2023-2024 632/JJM 13/09/2023 0 PARTHA PRATIM ACHARYA 0.77 0.00 0 0
3721 PURBA BARDHAMAN Burdwan Division Providing Functional House Hold Tap Connection (FHTC) by retrofitting within the command area of Sahapurr Piped Water Supply Scheme , SM/07201 Retrofitting Detail route survey, design of distribution network and preparation of estimate, drawing & DPR for providing FHTC in the scheme AGRADWIP, KHETPUR PALASHI, SAHAPUR PWSS (Sl No-1) Assistant Engineer JUNIOR ENGINEER KATWA SUB-DIVISION PHE DTE ORD/000069/2023-2024 393/KTS 13/04/2023 30 SIRCON ENGINEERING SERVICES 3.71 1.24 33.42 100
3722 PURBA BARDHAMAN Burdwan Division Providing Functional House Hold Tap Connection (FHTC) by retrofitting within the command area of Sahapurr Piped Water Supply Scheme , SM/07201 Retrofitting Augmentation of SAHAPUR Piped Water Supply Scheme with sinking of Tube-well, LDS, Rising Main, FHTC & renovation of switch-rooms & boundary walls at different TW site under Katwa-II Block, District:- Purba-Bardhaman. Assistant Engineer JUNIOR ENGINEER KATWA SUB-DIVISION PHE DTE ORD/000132/2023-2024 2343/BWD 22/05/2023 120 KHEPIMA ENGINEERS CO. OPERATIVE SOCIETY LTD. 137.76 8.74 6.34 95
3723 PURBA BARDHAMAN Burdwan Division Providing Functional House Hold Tap Connection (FHTC) by retrofitting within the command area of Sahapurr Piped Water Supply Scheme , SM/07201 Retrofitting Continuation work order for Supply of 1 (one) No. Diesel driven Ambassador Car (Luxury Taxi) / Motor Cab on hire basis for the Office of the Assistant Engineer, under Katwa Sub-Division within Burdwan Division, P.H.E. Dte. [Period from 01.07.2024 to 31.12.2024]. Assistant Engineer JUNIOR ENGINEER KATWA SUB-DIVISION PHE DTE ORD/000562/2024-2025 788/KTS 28/06/2024 183 KRISHNA MONDAL 2.40 2.32 96.67 80
3724 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting at Manikhar PWS , SM/06751 Retrofitting Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of MANIKHAR Piped Water Supply Scheme at Kalna-I Block under Burdwan Division, PHE Dte. (Agreement No. 47/2020-2021 OF SE/CC/PHE. DTE.) Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000113/2020-2021 4787/BWD 02/12/2020 90 H SAMANTA 96.04 0.00 0 1
3725 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting at Manikhar PWS , SM/06751 Retrofitting Hire & fuel charges of vehicle (Car No.-WB-04G-7127) for the office of the Assistant Engineer, Kalna Sub-Division, PHE Dte. for the month of March to September'2022. BILL/00145/2022-2023 866/VEH 09/12/2022 0 PARTHA PRATIM ACHARYA 2.79 0.00 0 0
3726 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting at Manikhar PWS , SM/06751 Retrofitting Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of PANUHAT Piped Water Supply Scheme at different villages, Katwa-I Block under Burdwan Division, PHE Dte. (Part-A).[Agreement No. 727/BWD OF 2020-2021.] Assistant Engineer JUNIOR ENGINEER KATWA SUB-DIVISION PHE DTE ORD/000326/2020-2021 1688/BWD 24/02/2021 45 HAMID SK 35.66 32.68 91.64 0
3727 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting at Manikhar PWS , SM/06751 Retrofitting Supply of 10 mm NB Gun-metal Ferrule conforming to IS: 2692-1989 for Water tap connection in each house hold from existing distribution system within Scheme jurisdiction in different Piped Water Supply Scheme within Kalna Sub-Division under Burdwan Division, PHE. Dte. and delivered at Borsul Divl. Store. [Part-5]. AE(HQs) J.E. 2 BURDWAN ORD/000090/2021-2022 3590/BWD 13/07/2021 30 PREMANANDA ROY BISWAS 127.50 82.29 64.54 1
3728 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting at Manikhar PWS , SM/06751 Retrofitting Supply of 10 mm NB Gun-metal Ferrule conforming to IS: 2692-1989 for Water tap connection in each house hold from existing distribution system within Scheme jurisdiction in different Piped Water Supply Scheme within Kalna Sub-Division under Burdwan Division, PHE. Dte. and delivered at Borsul Divl. Store. [Part-4]. ORD/000004/2021-2022 3117/BWD 02/06/2021 30 PREMANANDA ROY BISWAS 76.65 27.07 35.32 0
3729 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting at Manikhar PWS , SM/06751 Retrofitting Supply of 10 mm NB Gun-Metal Ferrule conforming to IS:2692-1989 for water tap connection in each house hold from existing distribution system within scheme jurisdiction in different piped water supply scheme within Katwa Sub-Division under Burdwan Division, PHE Dte. and delivered at Barsul Divisional Store.[Part-4] ORD/000108/2021-2022 3186/BWD 08/06/2021 30 R.K. INDUSTRIES 76.05 50.06 65.83 0
3730 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of ABUJHATI Piped Water Supply Scheme at Jamalpur Block , SM/07861 Retrofitting Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Abujhati village of Abujhati piped water supply scheme within Burdwan Sub-Division under Burdwan Division, PHE Dte. [Phase-I](Tr No.-312/BWD/2020-21) Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000167/2020-2021 2739/BWD 10/08/2020 30 INDRAJIT MONDAL 4.92 9.84 200 1
3731 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of ABUJHATI Piped Water Supply Scheme at Jamalpur Block , SM/07861 Retrofitting Providing Functional Household tap connection (FHTC) from existing distribution system within the command area of Abujhati piped water supply scheme at Astai, Dastanpur & Keotara village (Mouza), Jamalpur Block under Burdwan Division, PHE Dte. [Tr No.-624/BWD/20-21] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000404/2020-2021 955/BWD 03/02/2021 45 BHARAT CONSTRUCTION 41.04 79.36 193.37 1
3732 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of ABUJHATI Piped Water Supply Scheme at Jamalpur Block , SM/07861 Retrofitting Providing functional household tap connection from existing distribution system within the command area of Abujhati piped water supply scheme at Napara, Panchshimul & Siromani village Jamalpur Block under Burdwan Division, PHE Dte. (Tr No.-627/BWD/2020-21) Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000371/2020-2021 954/BWD 03/02/2021 45 KOUSIK MALLICK 38.90 77.15 198.33 1
3733 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of ABUJHATI Piped Water Supply Scheme at Jamalpur Block , SM/07861 Retrofitting Continuation work order for Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Abujhati village of Abujhati piped water supply scheme within Burdwan Sub-Division under Burdwan Division, PHE Dte. [Phase-I](Tr No.-456/BWD/2020-21) Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000171/2020-2021 3740/BWD 07/10/2020 30 INDRAJIT MONDAL 4.92 9.84 200 1
3734 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of ABUJHATI Piped Water Supply Scheme at Jamalpur Block , SM/07861 Retrofitting Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Ajhapur village of Abujhati piped water supply scheme within Burdwan Sub-Division under Burdwan Division, PHE Dte. [Phase-I](Tr No.-331/BWD/2020-21) Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000168/2020-2021 2748/BWD 10/08/2020 30 E-WORLD 4.92 9.84 200 1
3735 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of ABUJHATI Piped Water Supply Scheme at Jamalpur Block , SM/07861 Retrofitting Sinking of 300 X 200mm dia Tube Well 150 mtr. Depth by D.R. Rig method using UPVC pipe (CM) and UPVC Medium Well Screen (RMS) of ABUJHATI & its adjoining mouzas Piped Water Supply Scheme, Block - Jamalpur, Dist - Purba Bardhaman under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000544/2022-2023 5125/BWD 21/11/2022 30 SUSUNIA GP CO. OPERATIVE LABOUR CONTRACT AND CONSTRUCTION SOCIETY LTD. 11.23 10.88 96.88 1
3736 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of ABUJHATI Piped Water Supply Scheme at Jamalpur Block , SM/07861 Retrofitting Providing leftout water tap connection in different villages for 100% coverage to make it Sajal Gram from existing distribution system within scheme jurisdiction of different Piped Water Supply Schemes within Jamalpur Block (Paratal-II, Berugram, Abujhati & Chakdighi G.P.) under Burdwan Division, PHE. Dte. (Part-B). AE(HQs),Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JE/RWS/JAMALPUR ORD/000345/2021-2022 40/BWD 05/01/2022 30 PREMANANDA ROY BISWAS 22.68 7.40 32.63 1
3737 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of ABUJHATI Piped Water Supply Scheme at Jamalpur Block , SM/07861 Retrofitting Providing leftout water tap connection in different villages for 100% coverage to make it Sajal Gram from existing distribution system within scheme jurisdiction of different Piped Water Supply Schemes within Jamalpur Block (Jarogram, Ajhapur, Panchra & Jougram G.P.) under Burdwan Division, PHE. Dte. (Part-A)_2ND CALL. AE(HQs),Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JE/RWS/JAMALPUR ORD/000592/2021-2022 1454/BWD 11/03/2022 30 PREMANANDA ROY BISWAS 18.83 6.00 31.86 1
3738 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of ABUJHATI Piped Water Supply Scheme at Jamalpur Block , SM/07861 Retrofitting Withdrawing and Relaying of Rising main line and Bullah pilling (60.0 mtr) at HD Works Site (near pond) due to Road widening from 4lane to 6 lane of NH2 at chanage 601+951 and 601+650 of ABUJHATI PWSS to in Jamalpur Block within Burdwan Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000760/2022-2023 1290/BWD 20/03/2023 30 SOUMYAVASH DAS 5.77 5.74 99.48 100
3739 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of ABUJHATI Piped Water Supply Scheme at Jamalpur Block , SM/07861 Retrofitting Continuation work order for Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Ajhapur village of Abujhati piped water supply scheme within Burdwan Sub-Division under Burdwan Division, PHE Dte. [Phase-I](Tr No.-429/BWD/2020-21) Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000172/2020-2021 3803/BWD 08/10/2020 30 E-WORLD 4.92 9.84 200 1
3740 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of ABUJHATI Piped Water Supply Scheme at Jamalpur Block , SM/07861 Retrofitting Improvement of 300cum. OHR (Concreting,Plastering,Primer and Painting) for Abujhati PWSS under Jamalpur Block under Burdwan Division PHE Dte. RWS_JAMALPUR ORD/000134/2024-2025 1015/BSD 07/06/2024 45 DEBASHISH ENTERPRISE 2.01 0.00 0 0
3741 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of ABUJHATI Piped Water Supply Scheme at Jamalpur Block , SM/07861 Retrofitting Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of Abujhati Piped Water Supply Scheme at Abujhati (Part) (3 Nos Habitation Part) & Ajapur (Part) (Abujhati Part Habitation) Village (Mouza), Jamalpur Block under Burdwan Division, PHE Dte. _2ND CALL. [Agreement No. 754/BWD OF 2020-2021] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. Junior Engineer, R.W.S. Burdwan Sub Division, P.H.E. Dt ORD/000412/2020-2021 1740/BWD 25/02/2021 45 T.K. BANERJEE & CO. 34.87 70.22 201.38 0
3742 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of ABUJHATI Piped Water Supply Scheme at Jamalpur Block , SM/07861 Retrofitting Extension of pipeline for providing functional household tap connection at Dastanpur & Keotara village (Mouza) of ABUJHATI piped water supply scheme within Burdwan Sub-Division under Burdwan Division, PHE Dte.(Gr.-D) Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. Junior Engineer, R.W.S. Burdwan Sub Division, P.H.E. Dt ORD/000154/2021-2022 1091/BSD 18/08/2021 45 BHARAT CONSTRUCTION 3.36 6.69 199.11 0
3743 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of ABUJHATI Piped Water Supply Scheme at Jamalpur Block , SM/07861 Retrofitting Laying different dia UPVC Pipeline for inter connection of existing FHTC near Kayastyaparan of Abujhati Flyover i.c.w. Road widening from 4 lane to 6 lane of NH-2 at chane 601+9521+960 under ABUIHATI PWSS in jamalpur Block within Burdwan Sub Divn. under Burdwan Division, P.H.E. Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/001093/2023-2024 517/BSD 13/03/2024 30 SOUMYAVASH DAS 0.89 0.88 98.88 100
3744 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of ABUJHATI Piped Water Supply Scheme at Jamalpur Block , SM/07861 Retrofitting Construction of Boundary wall, Land Development for various PWSS, Block- Jamalpur, District:- Purba-Bardhaman within Burdwan Sub Division under Burdwan Division PHE Dte. AE(HQs),AE(HQs), Burdwan Division, PHE Dte. Junior Engineer, Burdwan Division ORD/001100/2024-2025 433/BWD 20/01/2025 120 RABINDRA NATH GORANG 132.64 0.00 0 40
3745 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Dirghapara Piped Water Supply Scheme at Purbasthali-I Block , SM/07804 Retrofitting Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Dirghapara village and Dirghapara (Part-B) habitation of Dirghapara piped water supply scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. [Phase-I](Tr No.-484/BWD/2020-21) Assistant Engineer ORD/000175/2020-2021 4119/BWD 16/10/2020 30 SK NUR ALAM 4.86 9.73 200.21 1
3746 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Dirghapara Piped Water Supply Scheme at Purbasthali-I Block , SM/07804 Retrofitting Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Kharashgram (Part) village (Kharashgram (Part) habitation) of Dirghapara Piped Water Supply Scheme within Kalna Sub-Divn. under Burdwan Division, PHE. Dte. (Part - B) [Sl. No. : ¿11¿] Assistant Engineer ORD/000649/2020-2021 61/BWD 05/01/2021 15 SK NUR ALAM 4.86 9.71 199.79 1
3747 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Dirghapara Piped Water Supply Scheme at Purbasthali-I Block , SM/07804 Retrofitting Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Kharashgram (Part) village , Kharashgram (Part) habitation of Dirghapara piped water supply scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. [Part-C][SL NO.-12] Assistant Engineer ORD/000705/2020-2021 62/BWD 05/01/2021 15 INVENT ENGINEERS CO. OPERATIVE SOCIETY LTD. 4.84 9.68 200 1
3748 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Dirghapara Piped Water Supply Scheme at Purbasthali-I Block , SM/07804 Retrofitting Continuation work order for Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Kharashgram (Part) village (Kharashgram (Part) habitation) of Dirghapara Piped Water Supply Scheme within Kalna Sub-Divn. under Burdwan Division, PHE. Dte. (Part - A) [Sl. No. : ¿10¿] Assistant Engineer ORD/000197/2021-2022 6231/BWD 01/11/2021 15 HAFIJUR RAHAMAN MIDYA 4.86 4.86 100 1
3749 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Dirghapara Piped Water Supply Scheme at Purbasthali-I Block , SM/07804 Retrofitting Continuation work order for Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Kharashgram (Part) village (Kharashgram (Part) habitation) of Dirghapara Piped Water Supply Scheme within Kalna Sub-Divn. under Burdwan Division, PHE. Dte. (Part - B) [Sl. No. : ¿11¿] Assistant Engineer ORD/000198/2021-2022 6232/BWD 01/11/2021 15 SK NUR ALAM 4.86 4.76 97.94 1
3750 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Dirghapara Piped Water Supply Scheme at Purbasthali-I Block , SM/07804 Retrofitting Continuation work order for Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Dirghapara village and Dirghapara (Part-A) habitation of Dirghapara Piped Water Supply Scheme within Kalna Sub-Divn. under Burdwan Division, PHE. Dte. [Phase - I] [GROUP : ¿8A¿] Assistant Engineer ORD/000121/2021-2022 4391/BWD 31/08/2021 30 HAFIJUR RAHAMAN MIDYA 4.55 8.20 180.22 1
3751 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Dirghapara Piped Water Supply Scheme at Purbasthali-I Block , SM/07804 Retrofitting Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Kharashgram (Part) village (Kharashgram (Part) habitation) of Dirghapara Piped Water Supply Scheme within Kalna Sub-Divn. under Burdwan Division, PHE. Dte. (Part - A) [Sl. No. : ¿10¿] Assistant Engineer ORD/000648/2020-2021 60/BWD 05/01/2021 15 HAFIJUR RAHAMAN MIDYA 4.86 9.72 200 1
3752 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Dirghapara Piped Water Supply Scheme at Purbasthali-I Block , SM/07804 Retrofitting Extension of 63 mm dia UPVC pipeline to provide house connection at different leftout portion of Dirghapara w/s scheme within Kalna Sub-Division under Burdwan Division, PHE Dte.[Sl-E] Assistant Engineer ORD/000937/2020-2021 171/KSD 19/02/2021 30 SK RAJU 1.78 1.62 91.01 1
3753 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Dirghapara Piped Water Supply Scheme at Purbasthali-I Block , SM/07804 Retrofitting Continuation work order for Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Kharashgram (Part) village (Kharashgram (Part) habitation) of Dirghapara Piped Water Supply Scheme within Kalna Sub-Divn. under Burdwan Division, PHE. Dte. (Part - C) [Sl. No. : ¿12¿] Assistant Engineer ORD/000205/2021-2022 6401/BWD 16/11/2021 15 INVENT ENGINEERS CO. OPERATIVE SOCIETY LTD. 4.84 4.84 100 1
3754 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Dirghapara Piped Water Supply Scheme at Purbasthali-I Block , SM/07804 Retrofitting Restoration of UPVC pipeline which damaged during construction of PCC road & providing FHTC work at DIRGHAPARA Water Supply Scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. ORD/000949/2023-2024 5594/BWD 20/12/2023 30 UTPAL NANDI 8.31 0.00 0 0
3755 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Dirghapara Piped Water Supply Scheme at Purbasthali-I Block , SM/07804 Retrofitting Extension of different dia UPVC pipeline at the leftout portion of Kharoshgram village of Dirghapara PWSS within Kalna Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer ORD/000243/2021-2022 6106/BWD 08/10/2021 30 M/S UNIQUE 6.67 6.86 102.85 1
3756 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Dirghapara Piped Water Supply Scheme at Purbasthali-I Block , SM/07804 Retrofitting Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Jagarpur & Mugura village of Mugura Piped Water Supply Scheme within Headquarters under Burdwan Division, PHE. Dte. [Phase - I] [GROUP : ¿3B¿] (Agreement no.238/BWD of 2020-21) Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000136/2020-2021 4118/BWD 16/10/2020 30 HAFIJUR RAHAMAN MIDYA 4.92 9.73 197.76 1
3757 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Dirghapara Piped Water Supply Scheme at Purbasthali-I Block , SM/07804 Retrofitting Different types of works involve in connection with Augmentation of DIRGHAPARA (SM/07804) Water Supply Scheme, MOUDANGA (SM/ 14020) Water supply Scheme & BHANDARTIKURI (SM/14925) Water Supply Scheme under Burdwan Division, PHE Dte. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000357/2024-2025 2912/BWD 25/07/2024 431 BANSBERIA CONSTRUCTION CO. 293.38 0.00 0 22
3758 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting at Purba Sahapur PWSS , SM/06768 Retrofitting Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Purba Sahapur (Pt-B) village of Purba Sahapur Piped Water Supply Scheme within Kalna Sub-Divn. under Burdwan Division, PHE. Dte. [Phase - I] [Sl.No : 7B] Assistant Engineer ORD/000131/2020-2021 2584/BWD 09/07/2020 30 SETH ENTERPRISE 4.92 0.00 0 1
3759 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting at Purba Sahapur PWSS , SM/06768 Retrofitting Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Purba Sahapur (Pt-A) village of Purba Sahapur Piped Water Supply Scheme within Kalna Sub-Divn. under Burdwan Division, PHE. Dte. [Phase - I] [Sl.No : 7A] Assistant Engineer ORD/000132/2020-2021 2585/BWD 09/07/2020 30 YOUNG ENGINEERS CO.-OPERATIVE SOCIETY LTD. 4.92 0.00 0 1
3760 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting at Purba Sahapur PWSS , SM/06768 Retrofitting Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Purba Sahapur (Pt-B) village of Purba Sahapur Piped Water Supply Scheme within Kalna Sub-Divn. under Burdwan Division, PHE. Dte. [Phase - I] [Sl.No : 7B] Assistant Engineer ORD/000738/2020-2021 2587/BWD 04/08/2020 30 SETH ENTERPRISE 4.92 4.92 100 1
3761 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting at Purba Sahapur PWSS , SM/06768 Retrofitting Continuation work order for supply of 10 mm NB Gun-Metal /Brass Ferrul conforming to IS:2692-1989 for water tap connection in each household from existing distribution system within scheme jurisdiction in different piped water supply scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. and delivered at Barsul Divisional Store.[Part-6] Assistant Engineer ORD/000867/2020-2021 4318/BWD 04/11/2020 10 MD HASIN 4.93 2.55 51.72 1
3762 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting at Purba Sahapur PWSS , SM/06768 Retrofitting Extension of pipeline at Purbasahapur mouza under Purbasahapur water supply scheme within Kalna Sub-Division under Burdwan Division, PHE Dte.[Sl-A] Assistant Engineer ORD/000930/2020-2021 29/KSD 11/01/2021 45 YOUNG ENGINEERS CO.-OPERATIVE SOCIETY LTD. 4.84 4.73 97.73 1
3763 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting at Purba Sahapur PWSS , SM/06768 Retrofitting Continuation work order for Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Sahapur (Pt-A) village of Sahapur Piped Water Supply Scheme within Katwa Sub-Divn. under Burdwan Division, PHE. Dte. [Phase - I] [SL.No : ¿11A¿] (Agreement no.-501/BWD of 2020-21) Assistant Engineer ORD/000145/2020-2021 4083/BWD 16/10/2020 30 RAINBOW CONSTRUCTION 2.23 4.46 200 1
3764 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting at Purba Sahapur PWSS , SM/06768 Retrofitting Continuation work order for Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Sahapur (Part-B) village of Sahapur piped water supply scheme within Katwa Sub-Division under Burdwan Division, PHE Dte. [Phase-I](Tr No.-497/BWD/2020-21) Assistant Engineer JUNIOR ENGINEER KATWA SUB-DIVISION PHE DTE ORD/000547/2020-2021 4007/BWD 14/10/2020 30 DUBE ENTERPRISE 2.84 5.67 199.65 0
3765 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting at Purba Sahapur PWSS , SM/06768 Retrofitting Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Sahapur, Char Sahapur and Natungram village of Sahapur piped water supply scheme within Katwa Sub-Division under Burdwan Division, PHE Dte. (Tr No.-789/BWD/2020-21) Assistant Engineer JUNIOR ENGINEER KATWA SUB-DIVISION PHE DTE ORD/000517/2020-2021 365/KTS 15/12/2020 7 DUBE ENTERPRISE 2.46 4.92 200 0
3766 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting at Purba Sahapur PWSS , SM/06768 Retrofitting Digital structurization of pipeline alignment and asset evaluation including holistic design, preparation of design drawings of overall LDS & preparation of estimate for 03 Nos. Piped W/S. Schemes under Kalna II Block under Kalna Sub-Division under Burdwan Division, PHE. Dte. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000336/2024-2025 3016/BWD 05/08/2024 20 HORIZEN 7.55 2.52 33.38 100
3767 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting at Madanagar PWSS , SM/06770 Retrofitting Continuation work order for Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Madanagar habitation of Madanagar piped water supply scheme within Burdwan Sub-Division under Burdwan Division, PHE Dte.(Tr No.-531/BWD/2020-21) Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000199/2020-2021 3741/BWD 07/10/2020 30 PABITRA KUMAR SAMANTA 4.92 9.84 200 1
3768 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting at Madanagar PWSS , SM/06770 Retrofitting Continuation work order for Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Madanagar village of Madanagar piped water supply scheme within Burdwan Sub-Division under Burdwan Division, PHE Dte. [Phase-I](Tr No.-716/BWD/2020-21) Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000651/2020-2021 1224/BWD 11/02/2021 30 PABITRA KUMAR SAMANTA 3.76 7.53 200.27 1
3769 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting at Madanagar PWSS , SM/06770 Retrofitting Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Madanagar (Part) village (Madanagar Mejhpur Habitation) of Madanagar piped water supply scheme within Burdwan Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000605/2020-2021 69/BWD 05/01/2021 15 PABITRA KUMAR SAMANTA 4.86 8.11 166.87 1
3770 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting at Madanagar PWSS , SM/06770 Retrofitting Providing leftout water tap connection in different villages for 100% coverage to make it Sajal Gram from existing distribution system within scheme jurisdiction of different Piped Water Supply Schemes within Raina ¿ I Block under Burdwan Division, PHE. Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000344/2021-2022 39/BWD 05/01/2022 30 HAFIJUR RAHAMAN MIDYA 15.62 0.00 0 1
3771 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting at Madanagar PWSS , SM/06770 Retrofitting Extension Pipeline with Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of MADANAGAR Piped Water Supply Scheme within Raina I Block of Burdwan Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000063/2023-2024 1935/BWD 24/04/2023 30 S.C. ENTERPRISE 20.87 20.64 98.9 100
3772 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting at Madanagar PWSS , SM/06770 Retrofitting Preparation and Submission of DPR for Augmentation of Ground Water Based Piped Water Supply Scheme for MADHANAGAR, Block:Raina-I under Burdwan Division, P.H.E Dte. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000990/2024-2025 1912/BSD 28/08/2024 15 MEASURE LAND 0.78 0.00 0 0
3773 PURBA BARDHAMAN Burdwan Division Augmentation of ANUKHAL PWSS for providing Functional Household Tap Connection (FHTC) KALNA-II block under KALNA Sub Division of Burdwan Division in Purba Bardhaman District , SM/09403 Augmentation Preparation of DPR for augmentation of Anukhal W/S Scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. (Sl No-D) Assistant Engineer ORD/000570/2021-2022 206/KSD 23/02/2022 21 INDRANIL DUTTA & ASSOCIATES 2.86 2.82 98.6 1
3774 PURBA BARDHAMAN Burdwan Division Augmentation of ANUKHAL PWSS for providing Functional Household Tap Connection (FHTC) KALNA-II block under KALNA Sub Division of Burdwan Division in Purba Bardhaman District , SM/09403 Augmentation Supply of materials for different water supply scheme under Burdwan Division, PHE Dte. VCH/001578/2021-2022 1207/DW 10/03/2022 0 EXECUTIVE ENGINEER, RESOURCES DIVISION, P.H.E. DTE. 3,005.00 0.00 0 0
3775 PURBA BARDHAMAN Burdwan Division Augmentation of ANUKHAL PWSS for providing Functional Household Tap Connection (FHTC) KALNA-II block under KALNA Sub Division of Burdwan Division in Purba Bardhaman District , SM/09403 Augmentation Material Requisition To Resource Division RTOR000210/2021-2022 1533/BWD 15/03/2022 0 Resource Division 0.37 0.00 0 0
3776 PURBA BARDHAMAN Burdwan Division Augmentation of ANUKHAL PWSS for providing Functional Household Tap Connection (FHTC) KALNA-II block under KALNA Sub Division of Burdwan Division in Purba Bardhaman District , SM/09403 Augmentation Material Requisition To Resource Division RTOR000055/2021-2022 531/BWD 27/01/2022 0 Resource Division 14.56 0.00 0 0
3777 PURBA BARDHAMAN Burdwan Division Augmentation of ANUKHAL PWSS for providing Functional Household Tap Connection (FHTC) KALNA-II block under KALNA Sub Division of Burdwan Division in Purba Bardhaman District , SM/09403 Augmentation Material Requisition To Resource Division RTOR000148/2021-2022 1242/BWD 07/03/2022 0 Resource Division 4.93 0.00 0 0
3778 PURBA BARDHAMAN Burdwan Division Augmentation of ANUKHAL PWSS for providing Functional Household Tap Connection (FHTC) KALNA-II block under KALNA Sub Division of Burdwan Division in Purba Bardhaman District , SM/09403 Augmentation Material Requisition To Resource Division RTOR000160/2021-2022 1320/BWD 08/03/2022 0 Resource Division 32.89 0.00 0 0
3779 PURBA BARDHAMAN Burdwan Division Augmentation of ANUKHAL PWSS for providing Functional Household Tap Connection (FHTC) KALNA-II block under KALNA Sub Division of Burdwan Division in Purba Bardhaman District , SM/09403 Augmentation Material Requisition To Resource Division RTOR000041/2022-2023 4627/BWD 17/10/2022 0 Resource Division 12.32 0.00 0 0
3780 PURBA BARDHAMAN Burdwan Division Augmentation of ANUKHAL PWSS for providing Functional Household Tap Connection (FHTC) KALNA-II block under KALNA Sub Division of Burdwan Division in Purba Bardhaman District , SM/09403 Augmentation Augmentation of ANUKHAL Piped Water Supply Scheme with LDS, FHTC, Rising main, Construction of 250 cum capacity OHR with 20.0 mtr. Staging height inclusive of soil investigation with construction of boundary wall at Headworks site under Kalna-II Block, District:- Purba-Burdwan. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000096/2022-2023 2741/BWD 08/06/2022 365 SINGHA ROY AND CO. 374.09 327.71 87.6 70
3781 PURBA BARDHAMAN Burdwan Division Augmentation of ANUKHAL PWSS for providing Functional Household Tap Connection (FHTC) KALNA-II block under KALNA Sub Division of Burdwan Division in Purba Bardhaman District , SM/09403 Augmentation Additional work to implement augmentation of ANUKHAL Water Supply Scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000821/2023-2024 4998/BWD 21/11/2023 30 UDYOG CONSTRUCTION 7.48 3.91 52.27 100
3782 PURBA BARDHAMAN Burdwan Division Augmentation of ANUKHAL PWSS for providing Functional Household Tap Connection (FHTC) KALNA-II block under KALNA Sub Division of Burdwan Division in Purba Bardhaman District , SM/09403 Augmentation Quotation from WBSEDCL for Augmentation of Anukhal w/s scheme under Burdwan Division, PHE Dte. P.H. No.-3 & 4. BILL/00907/2024-2025 1046/JJM 30/10/2024 0 WBSEDCL 17.05 0.00 0 0
3783 PURBA BARDHAMAN Burdwan Division Augmentation of ANUKHAL PWSS for providing Functional Household Tap Connection (FHTC) KALNA-II block under KALNA Sub Division of Burdwan Division in Purba Bardhaman District , SM/09403 Augmentation Sinking of tube well, Laying dist. system, Providing FHTC, construction of Pump House & Boundary and Laying rising main of ANUKHAL Piped Water Supply Scheme within Kalna Sub-Divn. under Burdwan Division, PHE. Dte. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000857/2023-2024 5206/BWD 29/11/2023 120 SINGHA ROY AND CO. 119.49 19.33 16.18 15
3784 PURBA BARDHAMAN Burdwan Division Augmentation of ground water based SANKARI PWSS to accommodate FHTC in KHANDOGHOSH block under Burdwan Sub Division of Burdwan Division in Purba Bardhaman District , SM/09405 Augmentation Route Survey & Preparation of DPR for Sankari W/S Scheme under Khandaghosh Block under Burdwan Sub-Division under Burdwan Division PHE Dte. Sl No.10. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000498/2021-2022 185/BSD 31/01/2022 30 RADIANT 2.52 2.52 100 1
3785 PURBA BARDHAMAN Burdwan Division Augmentation of ground water based SANKARI PWSS to accommodate FHTC in KHANDOGHOSH block under Burdwan Sub Division of Burdwan Division in Purba Bardhaman District , SM/09405 Augmentation Supply of materials for different water supply scheme under Burdwan Division, PHE Dte. VCH/001578/2021-2022 1207/DW 10/03/2022 0 EXECUTIVE ENGINEER, RESOURCES DIVISION, P.H.E. DTE. 3,005.00 0.00 0 0
3786 PURBA BARDHAMAN Burdwan Division Augmentation of ground water based SANKARI PWSS to accommodate FHTC in KHANDOGHOSH block under Burdwan Sub Division of Burdwan Division in Purba Bardhaman District , SM/09405 Augmentation Augmentation of SANKARI Piped Water Supply Scheme with LDS, Rising Main, Constn. of 250 cum capacity OHR with 20.0 Mtr. staging height inclusive of soil test & FHTC under Khandaghosh Block, District - Purba Bardhaman. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000527/2021-2022 1119/BWD 28/02/2022 365 UNIQUE AGENCY 208.48 186.67 89.54 100
3787 PURBA BARDHAMAN Burdwan Division Augmentation of ground water based SANKARI PWSS to accommodate FHTC in KHANDOGHOSH block under Burdwan Sub Division of Burdwan Division in Purba Bardhaman District , SM/09405 Augmentation Supply and delivery of different dia. CIDF sluice valve for Augmentation of SANKARI Piped Water Supply Scheme under Burdwan Division, P.H.E. Dte._SL No. 06 Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000617/2021-2022 140/AE/HQ 16/03/2022 10 MAKALI ENGINEERING CORPORATION 4.52 0.00 0 0
3788 PURBA BARDHAMAN Burdwan Division Augmentation of ground water based SANKARI PWSS to accommodate FHTC in KHANDOGHOSH block under Burdwan Sub Division of Burdwan Division in Purba Bardhaman District , SM/09405 Augmentation Material Requisition To Resource Division RTOR000204/2021-2022 1527/BWD 15/03/2022 0 Resource Division 0.37 0.00 0 0
3789 PURBA BARDHAMAN Burdwan Division Augmentation of ground water based SANKARI PWSS to accommodate FHTC in KHANDOGHOSH block under Burdwan Sub Division of Burdwan Division in Purba Bardhaman District , SM/09405 Augmentation Material Requisition To Resource Division RTOR000054/2021-2022 529/BWD 27/01/2022 0 Resource Division 6.82 0.00 0 0
3790 PURBA BARDHAMAN Burdwan Division Augmentation of ground water based SANKARI PWSS to accommodate FHTC in KHANDOGHOSH block under Burdwan Sub Division of Burdwan Division in Purba Bardhaman District , SM/09405 Augmentation Material Requisition To Resource Division RTOR000093/2021-2022 903/BWD 15/02/2022 0 Resource Division 18.21 0.00 0 0
3791 PURBA BARDHAMAN Burdwan Division Augmentation of ground water based SEHARA PWSS to accommodate FHTC in RAINA-I Block under Burdwan Suv Division of Burdwan Division in Purba Bardhaman , SM/09408 Augmentation Route Survey & Preparation of DPR for Sehara W/S Scheme under Raina-I Block under Burdwan Sub-Division under Burdwan Division PHE Dte. Sl No.9 Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000497/2021-2022 184/BSD 31/01/2022 30 RADIANT 2.85 2.85 100 1
3792 PURBA BARDHAMAN Burdwan Division Augmentation of ground water based SEHARA PWSS to accommodate FHTC in RAINA-I Block under Burdwan Suv Division of Burdwan Division in Purba Bardhaman , SM/09408 Augmentation Supply of materials for different water supply scheme under Burdwan Division, PHE Dte. VCH/001578/2021-2022 1207/DW 10/03/2022 0 EXECUTIVE ENGINEER, RESOURCES DIVISION, P.H.E. DTE. 3,005.00 0.00 0 0
3793 PURBA BARDHAMAN Burdwan Division Augmentation of ground water based SEHARA PWSS to accommodate FHTC in RAINA-I Block under Burdwan Suv Division of Burdwan Division in Purba Bardhaman , SM/09408 Augmentation Sinking of 300 X 200mm dia Tube Well 150 mtr. Depth by D.R. Rig method using UPVC pipe (CM) and UPVC Medium Well Screen (RMS) for Augmentation of SEHARA & its adjoining mouzas Piped Water Supply Scheme, Block ¿ Raina ¿ I, Dist - Purba Bardhaman under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000537/2022-2023 5025/BWD 10/11/2022 30 M/S D. PALIT & CO. 10.06 8.26 82.11 1
3794 PURBA BARDHAMAN Burdwan Division Augmentation of ground water based SEHARA PWSS to accommodate FHTC in RAINA-I Block under Burdwan Suv Division of Burdwan Division in Purba Bardhaman , SM/09408 Augmentation Material Requisition To Resource Division RTOR000212/2021-2022 1535/BWD 15/03/2022 0 Resource Division 0.37 0.00 0 0
3795 PURBA BARDHAMAN Burdwan Division Augmentation of ground water based SEHARA PWSS to accommodate FHTC in RAINA-I Block under Burdwan Suv Division of Burdwan Division in Purba Bardhaman , SM/09408 Augmentation Material Requisition To Resource Division RTOR000045/2021-2022 536/BWD 27/01/2022 0 Resource Division 15.56 0.00 0 0
3796 PURBA BARDHAMAN Burdwan Division Augmentation of ground water based SEHARA PWSS to accommodate FHTC in RAINA-I Block under Burdwan Suv Division of Burdwan Division in Purba Bardhaman , SM/09408 Augmentation Material Requisition To Resource Division RTOR000091/2021-2022 902/BWD 15/02/2022 0 Resource Division 13.85 0.00 0 0
3797 PURBA BARDHAMAN Burdwan Division Augmentation of ground water based SEHARA PWSS to accommodate FHTC in RAINA-I Block under Burdwan Suv Division of Burdwan Division in Purba Bardhaman , SM/09408 Augmentation Augmentation of SEHARA Piped Water Supply Scheme with LDS, Rising Main, Construction of 350 Cum capacity OHR with 20.0 Mtr. Staging height inclusive of soil test & FHTC under Raina ¿ I Block, District - Purba Bardhaman. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000599/2021-2022 1473/BWD 14/03/2022 365 M/S PIONEER CONSTRUCTION 430.73 394.99 91.7 100
3798 PURBA BARDHAMAN Burdwan Division Augmentation of ground water based SEHARA PWSS to accommodate FHTC in RAINA-I Block under Burdwan Suv Division of Burdwan Division in Purba Bardhaman , SM/09408 Augmentation Construction of Pump House cum chlorine room without sanitary and water supply arrangement at TubeWell Site to departmental drawing no-PHE/BD/P.H/DRG/02/DEC-17 (Size3.60mtr x 3.00mtr room) for SEHARA its Adjoining Mouza W/S Scheme, Block -Raina-I within Burdwan Sub-Division, PHE Dte. (Mouza- Sehara)_2ND CALL Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000576/2023-2024 2041/BSD 24/08/2023 45 ANWESHA CONSTRUCTION 3.21 2.87 89.41 100
3799 PURBA BARDHAMAN Burdwan Division Providing Functional House hold Tap Connection (FHTC) by retrofitting at Kalyanbati, Narayapur and Radhakrishnapur mouzas within the command area of Sudpur piped Water Supply Scheme at Katwa-I Block under Burdwan Division, P.H.E. DTE. (Pt.-B) , SM/08717 Retrofitting Construction of Pump House cum chlorine room without sanitary and water supply arrangement at Head Work Site to departmental drawing (Size 3.60 mtr x 3.00 mtr room) for SUDPUR water supply schemes under Katwa Sub-Division within Burdwan Division, PHE Dte.(Sl No-7) Assistant Engineer ORD/000146/2021-2022 595/KTS 06/09/2021 45 BABUL SK 2.99 2.62 87.63 1
3800 PURBA BARDHAMAN Burdwan Division Providing Functional House hold Tap Connection (FHTC) by retrofitting at Kalyanbati, Narayapur and Radhakrishnapur mouzas within the command area of Sudpur piped Water Supply Scheme at Katwa-I Block under Burdwan Division, P.H.E. DTE. (Pt.-B) , SM/08717 Retrofitting Extension of pipe line from the existing Distribution System within scheme jurisdiction at Rayerpara, Purba and Paschim Bijoynagar village under SUDPUR PWSS under Katwa Sub-Division under Burdwan Division PHE Dte [Sl - 5 ] Assistant Engineer JUNIOR ENGINEER KATWA SUB-DIVISION PHE DTE ORD/000125/2021-2022 565/KTS 31/08/2021 15 HAMID SK 3.60 3.59 99.72 1
3801 PURBA BARDHAMAN Burdwan Division Providing Functional House hold Tap Connection (FHTC) by retrofitting at Kalyanbati, Narayapur and Radhakrishnapur mouzas within the command area of Sudpur piped Water Supply Scheme at Katwa-I Block under Burdwan Division, P.H.E. DTE. (Pt.-B) , SM/08717 Retrofitting Extension of pipe line from the existing Distribution System within scheme jurisdiction at Sudpur, Lokpur & Narayanpur village under SUDPUR PWSS under Katwa Sub-Division under Burdwan Division PHE Dte [Sl - 4 ] Assistant Engineer JUNIOR ENGINEER KATWA SUB-DIVISION PHE DTE ORD/000120/2021-2022 564/KTS 31/08/2021 15 BABUL SK 2.42 2.42 100 1
3802 PURBA BARDHAMAN Burdwan Division Providing Functional House hold Tap Connection (FHTC) by retrofitting at Kalyanbati, Narayapur and Radhakrishnapur mouzas within the command area of Sudpur piped Water Supply Scheme at Katwa-I Block under Burdwan Division, P.H.E. DTE. (Pt.-B) , SM/08717 Retrofitting Supplying and laying of valves along with construction of valve chamber at the existing distribution pipe line of Sudpur PWSS under Katwa Sub-Division under Burdwan Division, PHE Dte [Sl No-05] Assistant Engineer JUNIOR ENGINEER KATWA SUB-DIVISION PHE DTE ORD/000158/2022-2023 441/KTS 27/06/2022 30 MD HASIN 0.86 0.85 98.84 1
3803 PURBA BARDHAMAN Burdwan Division Providing Functional House hold Tap Connection (FHTC) by retrofitting at Kalyanbati, Narayapur and Radhakrishnapur mouzas within the command area of Sudpur piped Water Supply Scheme at Katwa-I Block under Burdwan Division, P.H.E. DTE. (Pt.-B) , SM/08717 Retrofitting Detail route survey, design of distribution network and preparation of estimate, drawing & DPR for providing FHTC in the scheme SRIKHANDA, SUDPUR PWSS (Sl No-3) Assistant Engineer JUNIOR ENGINEER KATWA SUB-DIVISION PHE DTE ORD/000071/2023-2024 395/KTS 13/04/2023 30 SIRCON ENGINEERING SERVICES 2.48 2.48 100 100
3804 PURBA BARDHAMAN Burdwan Division Providing Functional House hold Tap Connection (FHTC) by retrofitting at Kalyanbati, Narayapur and Radhakrishnapur mouzas within the command area of Sudpur piped Water Supply Scheme at Katwa-I Block under Burdwan Division, P.H.E. DTE. (Pt.-B) , SM/08717 Retrofitting Supplying and laying inter-connection from Pump no.-3 to rising main of Sudpur PWSS under Katwa Sub-Division under Burdwan Division, PHE Dte.[Sl No-5] Assistant Engineer JUNIOR ENGINEER KATWA SUB-DIVISION PHE DTE ORD/000373/2023-2024 672/KTS 22/06/2023 30 HAMID SK 0.93 0.93 100 100
3805 PURBA BARDHAMAN Burdwan Division DETAILED PROJECT REPORT FOR AUGMENTATION F GROUND WATER BASED KUSUMGRAM (ZONE I AND ZONE II) PWSS TO ACCOMMODATE FHTC IN MANTESWAR BLOCK UNDER KALNA SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/10058 Augmentation Preparation of DPR for augmentation of Kusumgram W/S Scheme (Zone-I & II) within Kalna Sub-Division under Burdwan Division, PHE Dte. (Sl No-B) Assistant Engineer ORD/000569/2021-2022 204/KSD 23/02/2022 21 ROY CHOWDHURY ASSOCIATES 3.93 3.91 99.49 1
3806 PURBA BARDHAMAN Burdwan Division DETAILED PROJECT REPORT FOR AUGMENTATION F GROUND WATER BASED KUSUMGRAM (ZONE I AND ZONE II) PWSS TO ACCOMMODATE FHTC IN MANTESWAR BLOCK UNDER KALNA SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/10058 Augmentation Material Requisition To Resource Division RTOR000056/2022-2023 5521/BWD 23/12/2022 0 Resource Division 32.81 0.00 0 0
3807 PURBA BARDHAMAN Burdwan Division DETAILED PROJECT REPORT FOR AUGMENTATION F GROUND WATER BASED KUSUMGRAM (ZONE I AND ZONE II) PWSS TO ACCOMMODATE FHTC IN MANTESWAR BLOCK UNDER KALNA SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/10058 Augmentation Supply of materials for different water supply scheme under Burdwan Division, PHE Dte. VCH/001578/2021-2022 1207/DW 10/03/2022 0 EXECUTIVE ENGINEER, RESOURCES DIVISION, P.H.E. DTE. 3,005.00 0.00 0 0
3808 PURBA BARDHAMAN Central Mechanical DETAILED PROJECT REPORT FOR AUGMENTATION F GROUND WATER BASED KUSUMGRAM (ZONE I AND ZONE II) PWSS TO ACCOMMODATE FHTC IN MANTESWAR BLOCK UNDER KALNA SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/10058 Augmentation Supply , delivery & Installation of Submersible Pumping Machinery , Voltage stabiliser , Chlorinator and Internal House wiring for Tube well No. 3 of Kulut [ Kusumgram ] Water Supply Scheme under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER ORD/000010/2022-2023 1172/CMD 27/06/2022 30 M/S. DAS ELECTRIC CO. 9.33 8.93 95.71 1
3809 PURBA BARDHAMAN Burdwan Division DETAILED PROJECT REPORT FOR AUGMENTATION F GROUND WATER BASED KUSUMGRAM (ZONE I AND ZONE II) PWSS TO ACCOMMODATE FHTC IN MANTESWAR BLOCK UNDER KALNA SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/10058 Augmentation Sinking of 250 X 150mm dia Tube Well 150 mtr. Depth by D.R. Rig method using UPVC pipe (CM) and UPVC Medium Well Screen (RMS) for 1ST TW Site of Aug. of KUSUMGRAM (Z-II) & its adjoining mouzas Piped Water Supply Scheme, Block ? Monteswar, Dist - Purba Bardhaman under Burdwan Division, PHE Dte. _2ND CALL. Assistant Engineer ORD/000657/2022-2023 371/BWD 31/01/2023 30 SUSUNIA GP CO. OPERATIVE LABOUR CONTRACT AND CONSTRUCTION SOCIETY LTD. 7.33 6.84 93.32 1
3810 PURBA BARDHAMAN Central Mechanical DETAILED PROJECT REPORT FOR AUGMENTATION F GROUND WATER BASED KUSUMGRAM (ZONE I AND ZONE II) PWSS TO ACCOMMODATE FHTC IN MANTESWAR BLOCK UNDER KALNA SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/10058 Augmentation Installation of Electro-mechanical accessories at Kusungram zone-1 PH-2 (replacement T.W) Water Supply Scheme under CMD, PHE Dte., Dist.- Purba-Bardhaman ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000994/2023-2024 4361/CMD 21/09/2023 30 BENGAL ELECTRICAL CONSTRUCTION 1.97 1.97 100 100
3811 PURBA BARDHAMAN Burdwan Division DETAILED PROJECT REPORT FOR AUGMENTATION F GROUND WATER BASED KUSUMGRAM (ZONE I AND ZONE II) PWSS TO ACCOMMODATE FHTC IN MANTESWAR BLOCK UNDER KALNA SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/10058 Augmentation Material Requisition To Resource Division RTOR000224/2021-2022 1547/BWD 15/03/2022 0 Resource Division 0.37 0.00 0 0
3812 PURBA BARDHAMAN Burdwan Division DETAILED PROJECT REPORT FOR AUGMENTATION F GROUND WATER BASED KUSUMGRAM (ZONE I AND ZONE II) PWSS TO ACCOMMODATE FHTC IN MANTESWAR BLOCK UNDER KALNA SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/10058 Augmentation Sinking of Tube Well and laying of rising main and additional work of KUSUMGRAM Piped water supply scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. (P.P. Site- Kulut for for Safarda, Akbarnagar) Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000863/2023-2024 5205/BWD 29/11/2023 120 MANASH GHOSH 117.96 97.42 82.59 15
3813 PURBA BARDHAMAN Burdwan Division DETAILED PROJECT REPORT FOR AUGMENTATION F GROUND WATER BASED KUSUMGRAM (ZONE I AND ZONE II) PWSS TO ACCOMMODATE FHTC IN MANTESWAR BLOCK UNDER KALNA SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/10058 Augmentation Augmentation of Kusumgram Zone-I & II Piped Water Supply Scheme with LDS, FHTC, Rising main, Construction of 450 & 300 cum capacity OHR with 20.0 mtr. Staging height including construction of switch-room without sanitary & water supply arrangement, boundary wall including repairing of boundary wall under Monteswar Block, District:- Purba-Bardhaman. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000541/2022-2023 5079/BWD 17/11/2022 866 MANASH GHOSH 778.07 693.66 89.15 66
3814 PURBA BARDHAMAN Burdwan Division Augmentation of ground water based piped water supply scheme for Barabelun to accommodated FHTC under Jal Sapno Mission under Bhatar Block. , SM/09700 Augmentation Sinking of 300 X 200mm dia Tube Well 200 mtr. Depth by D.R. Rig method using UPVC pipe (CD) and UPVC Deep Well Screen (RDS) at 1st & 2nd Tubewell site for Augmentation of BAROBELUN Piped Water Supply Scheme, Block - Bhatar, Dist - Purba Bardhaman under Burdwan Division, PHE Dte. [2 Nos. GTW]. Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000013/2022-2023 1961/BWD 12/04/2022 45 ACME CONSTRUCTION 22.05 16.18 73.38 1
3815 PURBA BARDHAMAN Burdwan Division Augmentation of ground water based piped water supply scheme for Barabelun to accommodated FHTC under Jal Sapno Mission under Bhatar Block. , SM/09700 Augmentation Route Survey & Preparation of DPR for BARABELUN PWSS under Durgapur(Bardhaman North) Sub-Division under Burdwan Division PHE Dte.[SL-E] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000656/2021-2022 105/DSD 18/02/2022 15 RISHAN ENGINEERING CONSULTANCY 2.72 2.72 100 1
3816 PURBA BARDHAMAN Burdwan Division Augmentation of ground water based piped water supply scheme for Barabelun to accommodated FHTC under Jal Sapno Mission under Bhatar Block. , SM/09700 Augmentation New connection charges bill for Barabelun water supply scheme under Burdwan Division, PHE Dte.[Application No.-5003437581, Ref ID-503142125] VCH/000524/2022-2023 596/DW/22-23 21/09/2022 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LTD. 3.90 0.00 0 0
3817 PURBA BARDHAMAN Burdwan Division Augmentation of ground water based piped water supply scheme for Barabelun to accommodated FHTC under Jal Sapno Mission under Bhatar Block. , SM/09700 Augmentation Supply of materials for different water supply scheme under Burdwan Division, PHE Dte. VCH/001578/2021-2022 1207/DW 10/03/2022 0 EXECUTIVE ENGINEER, RESOURCES DIVISION, P.H.E. DTE. 3,005.00 0.00 0 0
3818 PURBA BARDHAMAN Central Mechanical Augmentation of ground water based piped water supply scheme for Barabelun to accommodated FHTC under Jal Sapno Mission under Bhatar Block. , SM/09700 Augmentation Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Augmentation of Barabelun Water Supply Scheme [ Block- Bhatar ] at 1st Tube well Site( Tube well No.-3) at under CMD, PHE Dte., Dist.- Purba-Bardhaman ASSISTANT ENGINEER ORD/000619/2022-2023 2095/CMD 08/09/2022 30 ELECTRICAL & MECHANICAL ENGINEERING CORPORATION 10.90 10.57 96.97 0
3819 PURBA BARDHAMAN Burdwan Division Augmentation of ground water based piped water supply scheme for Barabelun to accommodated FHTC under Jal Sapno Mission under Bhatar Block. , SM/09700 Augmentation Augmentation of BARABELUN Piped Water Supply Scheme with LDS, FHTC work, Rising Main, Switch Room (with water supply & sanitary arrangements), 400 Cum capacity OHR with 20.0 Mtr. Staging height inclusive of soil test & Boundary wall construction (HW, 2nd TW & 4th TW Site) with repairing of switch room cum chlorine room, Block - Bhatar, Dist. - Purba Bardhaman under Burdwan Division, PHE. Dte. Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000423/2021-2022 571/BWD 27/01/2022 365 MD HASIN 406.41 385.05 94.74 100
3820 PURBA BARDHAMAN Central Mechanical Augmentation of ground water based piped water supply scheme for Barabelun to accommodated FHTC under Jal Sapno Mission under Bhatar Block. , SM/09700 Augmentation Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Augmentation of Barabelun Water Supply Scheme [ Block- Bhatar ] at 2nd Tube well Site( Tube well No.-4) at under CMD, PHE Dte., Dist.- Purba-Bardhaman ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000621/2022-2023 2094/CMD 08/09/2022 30 M/S. SWAPAN BANERJEE 11.40 11.14 97.72 100
3821 PURBA BARDHAMAN Burdwan Division Augmentation of ground water based piped water supply scheme for Barabelun to accommodated FHTC under Jal Sapno Mission under Bhatar Block. , SM/09700 Augmentation Supply and delivery of different dia. CIDF sluice valve for Augmentation of Dignagar, Galsi, Barabelun & Kotachandipur Piped Water Supply Scheme within Durgapur (Burdwan North) Sub-Division under Burdwan Division, P.H.E. Dte. _2ND CALL Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000311/2022-2023 3624/BWD 22/08/2022 20 SSPR VALVE MANUFACTURING PVT LTD. 14.76 3.69 25 1
3822 PURBA BARDHAMAN Burdwan Division Augmentation of ground water based piped water supply scheme for Barabelun to accommodated FHTC under Jal Sapno Mission under Bhatar Block. , SM/09700 Augmentation Material Requisition To Resource Division RTOR000026/2021-2022 556/BWD 27/01/2022 0 Resource Division 13.64 0.00 0 0
3823 PURBA BARDHAMAN Burdwan Division Augmentation of ground water based piped water supply scheme for Barabelun to accommodated FHTC under Jal Sapno Mission under Bhatar Block. , SM/09700 Augmentation Material Requisition To Resource Division RTOR000101/2021-2022 770/BWD 07/02/2022 0 Resource Division 26.55 0.00 0 0
3824 PURBA BARDHAMAN Burdwan Division Augmentation of ground water based piped water supply scheme for Barabelun to accommodated FHTC under Jal Sapno Mission under Bhatar Block. , SM/09700 Augmentation Material Requisition To Resource Division RTOR000236/2021-2022 1560/BWD 15/03/2022 0 Resource Division 0.37 0.00 0 0
3825 PURBA BARDHAMAN Burdwan Division Augmentation of ground water based piped water supply scheme for Barabelun to accommodated FHTC under Jal Sapno Mission under Bhatar Block. , SM/09700 Augmentation Material Requisition To Resource Division RTOR000186/2021-2022 1381/BWD 09/03/2022 0 Resource Division 4.35 0.00 0 0
3826 PURBA BARDHAMAN Burdwan Division Augmentation of ground water based piped water supply scheme for Barabelun to accommodated FHTC under Jal Sapno Mission under Bhatar Block. , SM/09700 Augmentation Material Requisition To Resource Division RTOR000168/2021-2022 1328/BWD 08/03/2022 0 Resource Division 39.89 0.00 0 0
3827 PURBA BARDHAMAN Burdwan Division Augmentation of ground water based piped water supply scheme for Barabelun to accommodated FHTC under Jal Sapno Mission under Bhatar Block. , SM/09700 Augmentation Material Requisition To Resource Division RTOR000046/2022-2023 4854/BWD 20/10/2022 0 Resource Division 6.16 0.00 0 0
3828 PURBA BARDHAMAN Burdwan Division Augmentation of ground water based piped water supply scheme for Barabelun to accommodated FHTC under Jal Sapno Mission under Bhatar Block. , SM/09700 Augmentation Quotation for new connection charges of Augmentation of Barbelun w/s scheme under Burdwan Division, PHE Dte. T.W. No.-4 [Memo No.-5003603611/Quot/03, dt.-10/02/2023][App No.-5003603611, Ref. ID-503282585] BILL/00291/2022-2023 1115/JJM 27/02/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LTD. 2.40 0.00 0 0
3829 PURBA BARDHAMAN Burdwan Division Augmentation of ground water based piped water supply scheme for Barabelun to accommodated FHTC under Jal Sapno Mission under Bhatar Block. , SM/09700 Augmentation Making connection with 4th tube well, Construction of Plinth protection of OHR, Restoration of road and FHTC (The rest portion) of Bara Belun Water Supply Scheme at Bara Belun village & Providing Functional Household Tap Connection (FHTC) within the command area of NASIGRAM Piped W/S. Scheme within Bhatar Block under Burdwan Division, PHE. Dte. Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer2, Durgapur Sub-Division, PHE Dte. ORD/000690/2024-2025 3685/BWD 23/10/2024 120 INDIAN ENGINEERS CO.-OPERATIVE SOCIETY LTD. 91.48 0.00 0 0
3830 PURBA BARDHAMAN Burdwan Division Augmentation of ground water based piped water supply scheme for Barabelun to accommodated FHTC under Jal Sapno Mission under Bhatar Block. , SM/09700 Augmentation Providing Functional Household Tap Connection (FHTC)from distribution system within the command area of Barobelun water supply scheme at Baneswarpur village under JJM under Bhatar Block in Purba Bardhanan District undrer Burdwan Division, P.H.E. Dte. Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer2, Durgapur Sub-Division, PHE Dte. ORD/001019/2023-2024 130/DSD 07/02/2024 45 JAMALUDDIN SK 3.02 1.57 51.99 100
3831 PURBA BARDHAMAN Burdwan Division Augmentation of ground water based piped water supply scheme for Barabelun to accommodated FHTC under Jal Sapno Mission under Bhatar Block. , SM/09700 Augmentation Providing Functional Household Tap Connection (FHTC)from distribution system within the command area of Barobelun water supply scheme at Khulla village under JJM under Bhatar Block in Purba Bardhanan District undrer Burdwan Division, P.H.E. Dte. Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer2, Durgapur Sub-Division, PHE Dte. ORD/001020/2023-2024 131/DSD 07/02/2024 45 JAMALUDDIN SK 1.81 1.26 69.61 100
3832 PURBA BARDHAMAN Burdwan Division Extension of PWS to Anganwadi Centers (AWCs) located within the command area of PWSS under Burdwan Division. , SM/10016 Anganwadi Providing necessary water supply arrangement at 42 (Forty Two) Nos. Anganwadi Center having Electric Power connection within the command area of Memari - II Block under Burdwan Division, P.H.E. Dte. (Part - A). Assistant Engineer,Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE.,Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000135/2021-2022 4550/BWD 06/09/2021 30 SETH ENTERPRISE 17.71 5.48 30.94 1
3833 PURBA BARDHAMAN Burdwan Division Extension of PWS to Anganwadi Centers (AWCs) located within the command area of PWSS under Burdwan Division. , SM/10016 Anganwadi Providing necessary water supply arrangement at 57 (Fifty Seven) Nos. Anganwadi Center having no Electric Power connection within the command area of Ausgram - II Block under Burdwan Division, P.H.E. Dte. (Part-B). Assistant Engineer,Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE.,Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000403/2021-2022 281/BWD 17/01/2022 30 RELIABLE ENGINEERS CO.-OPERATIVE CONSTRUCTION SOCIETY LTD. 23.46 16.25 69.27 1
3834 PURBA BARDHAMAN Burdwan Division Extension of PWS to Anganwadi Centers (AWCs) located within the command area of PWSS under Burdwan Division. , SM/10016 Anganwadi Providing necessary water supply arrangement at 50 (Fifty) Nos. Anganwadi Center having Electric Power connection within the command area of Katwa - I Block (22 Nos.) & Katwa - II Block (28 Nos.) under Burdwan Division, P.H.E. Dte. Assistant Engineer ,Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE.,Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000025/2021-2022 3344/BWD 21/06/2021 30 TAPAS KUMAR ROY 23.88 13.32 55.78 1
3835 PURBA BARDHAMAN Burdwan Division Extension of PWS to Anganwadi Centers (AWCs) located within the command area of PWSS under Burdwan Division. , SM/10016 Anganwadi Providing necessary water supply arrangement at 50 (Fifty) Nos. Anganwadi Center having Electric Power connection within the command area of Memari - I Block under Burdwan Division, P.H.E. Dte. (Part - B). Assistant Engineer,Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE.,Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000019/2021-2022 3299/BWD 15/06/2021 30 JAGADANANDAPUR CO. OP. LABOUR CONTRACT AND CONSTRUCTION SOCIETY LTD. 23.93 20.97 87.63 1
3836 PURBA BARDHAMAN Burdwan Division Extension of PWS to Anganwadi Centers (AWCs) located within the command area of PWSS under Burdwan Division. , SM/10016 Anganwadi Providing necessary water supply arrangement at 50 (Fifty) Nos. Anganwadi Center having Electric Power connection within the command area of Memari - I Block under Burdwan Division, P.H.E. Dte. (Part - A). Assistant Engineer ,Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE.,Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000021/2021-2022 3334/BWD 18/06/2021 30 BRINDABAN KONAR 23.90 20.74 86.78 1
3837 PURBA BARDHAMAN Burdwan Division Extension of PWS to Anganwadi Centers (AWCs) located within the command area of PWSS under Burdwan Division. , SM/10016 Anganwadi Providing necessary water supply arrangement at 20 (Twenty) Nos. Anganwadi Center having Electric Power connection within the command area of Kalna - I Block (09 Nos.) & Kalna - II Block (11 Nos.) under Burdwan Division, P.H.E. Dte. Assistant Engineer,Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE.,Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000136/2021-2022 4549/BWD 06/09/2021 30 YOUNG ENGINEERS CO.-OPERATIVE SOCIETY LTD. 8.53 6.02 70.57 1
3838 PURBA BARDHAMAN Burdwan Division Extension of PWS to Anganwadi Centers (AWCs) located within the command area of PWSS under Burdwan Division. , SM/10016 Anganwadi Providing necessary water supply arrangement at 36 (Thirty Six) Nos. Anganwadi Center having Electric Power connection within the command area of Monteswar Block (17 Nos.) & Mongalkote Block (19 Nos.) under Burdwan Division, P.H.E. Dte. Assistant Engineer ,Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE.,Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000127/2021-2022 4552/BWD 06/09/2021 30 ASMA ENTERPRISE 17.18 12.92 75.2 1
3839 PURBA BARDHAMAN Burdwan Division Extension of PWS to Anganwadi Centers (AWCs) located within the command area of PWSS under Burdwan Division. , SM/10016 Anganwadi Providing necessary water supply arrangement at 18 (Eighteen) Nos. Anganwadi Center having Electric Power connection within the command area of Khandaghosh Block under Burdwan Division, P.H.E. Dte. Assistant Engineer,Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE.,Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000128/2021-2022 4546/BWD 06/09/2021 30 SHUBHRA KANTI GHOSH 8.62 5.42 62.88 1
3840 PURBA BARDHAMAN Burdwan Division Extension of PWS to Anganwadi Centers (AWCs) located within the command area of PWSS under Burdwan Division. , SM/10016 Anganwadi Providing necessary water supply arrangement at 54 (Fifty Four) Nos. Anganwadi Center having Electric Power connection within the command area of Jamalpur Block under Burdwan Division, P.H.E. Dte. (Part-B). Assistant Engineer ,Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE.,Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000134/2021-2022 4544/BWD 06/09/2021 30 KOUSIK MALLICK 25.88 19.21 74.23 1
3841 PURBA BARDHAMAN Burdwan Division Extension of PWS to Anganwadi Centers (AWCs) located within the command area of PWSS under Burdwan Division. , SM/10016 Anganwadi Providing necessary water supply arrangement at 20 (Twenty) Nos. Anganwadi Center having no Electric Power connection within the command area of Galsi - II Block under Burdwan Division, P.H.E. Dte. Assistant Engineer,Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE.,Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000404/2021-2022 282/BWD 17/01/2022 30 J. K. CORPORATION 8.11 7.94 97.9 1
3842 PURBA BARDHAMAN Burdwan Division Extension of PWS to Anganwadi Centers (AWCs) located within the command area of PWSS under Burdwan Division. , SM/10016 Anganwadi Providing necessary water supply arrangement at 30 (Thirty) Nos. Anganwadi Center having no Electric Power connection within the command area of Bhatar Block under Burdwan Division, P.H.E. Dte. Assistant Engineer,Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE.,Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000374/2021-2022 212/BWD 11/01/2022 30 BAMDEB CONSTRUCTION & CO 12.29 10.27 83.56 1
3843 PURBA BARDHAMAN Burdwan Division Extension of PWS to Anganwadi Centers (AWCs) located within the command area of PWSS under Burdwan Division. , SM/10016 Anganwadi Providing necessary water supply arrangement at 58 (Fifty Eight) Nos. Anganwadi Center having no Electric Power connection within the command area of Ausgram - II Block under Burdwan Division, P.H.E. Dte. (Part-A). Assistant Engineer,Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE.,Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000361/2021-2022 106/BWD 06/01/2022 30 ANWESHA CONSTRUCTION 23.05 21.89 94.97 1
3844 PURBA BARDHAMAN Burdwan Division Extension of PWS to Anganwadi Centers (AWCs) located within the command area of PWSS under Burdwan Division. , SM/10016 Anganwadi Providing necessary water supply arrangement at 69 (Sixty Nine) Nos. Anganwadi Center having no Electric Power connection within the command area of Ausgram - I Block under Burdwan Division, P.H.E. Dte. Assistant Engineer ,Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE.,Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000362/2021-2022 107/BWD 06/01/2022 30 DUBE ENTERPRISE 27.96 26.20 93.71 1
3845 PURBA BARDHAMAN Burdwan Division Extension of PWS to Anganwadi Centers (AWCs) located within the command area of PWSS under Burdwan Division. , SM/10016 Anganwadi Providing necessary water supply arrangement at 54 (Fifty Four) Nos. Anganwadi Center having no Electric Power connection within the command area of Jamalpur Block under Burdwan Division, P.H.E. Dte. (Part-A). Assistant Engineer ,Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE.,Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000343/2021-2022 38/BWD 05/01/2022 30 HAFIJUR RAHAMAN MIDYA 22.10 15.58 70.5 1
3846 PURBA BARDHAMAN Burdwan Division Extension of PWS to Anganwadi Centers (AWCs) located within the command area of PWSS under Burdwan Division. , SM/10016 Anganwadi Providing necessary water supply arrangement at 58 Nos Anganwari Centre having Electric Power connection within the command area of Memari-I Block under Burdwan Division, PHE Dte. [Part-C] Assistant Engineer,Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE.,Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000536/2021-2022 3203/BWD 09/06/2021 30 G.S. CONSTRUCTION & CO. 27.75 26.07 93.95 1
3847 PURBA BARDHAMAN Burdwan Division Extension of PWS to Anganwadi Centers (AWCs) located within the command area of PWSS under Burdwan Division. , SM/10016 Anganwadi Providing necessary water supply arrangement at 51 (Fifty One) Nos. Anganwadi Center having Electric Power connection within the command area of Galsi - I Block under Burdwan Division, P.H.E. Dte. Assistant Engineer,Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE.,Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000787/2021-2022 4545./BWD 06/09/2021 30 SHUBHRA KANTI GHOSH 24.42 15.45 63.27 1
3848 PURBA BARDHAMAN Burdwan Division Extension of PWS to Anganwadi Centers (AWCs) located within the command area of PWSS under Burdwan Division. , SM/10016 Anganwadi Providing necessary water supply arrangement at 53 (Fifty Three) Nos. Anganwadi Center having no Electric Power connection within the command area of Purbasthali - I Block (36 Nos.) & Purbasthali - II Block (17 Nos.) under Burdwan Division, P.H.E. Dte. Assistant Engineer,Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE.,Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000447/2021-2022 754/BWD 07/02/2022 30 BIPLAB GUHA 21.61 18.34 84.87 1
3849 PURBA BARDHAMAN Burdwan Division Extension of PWS to Anganwadi Centers (AWCs) located within the command area of PWSS under Burdwan Division. , SM/10016 Anganwadi Providing necessary water supply arrangement at 24 (Twenty Four) Nos. Anganwadi Center having Electric Power connection within the command area of Raina - I Block under Burdwan Division, P.H.E. Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000133/2021-2022 4547/BWD 06/09/2021 30 BARDHAMAN AQUA ENGINEERING 11.29 7.43 65.81 100
3850 PURBA BARDHAMAN Burdwan Division Extension of PWS to Anganwadi Centers (AWCs) located within the command area of PWSS under Burdwan Division. , SM/10016 Anganwadi Providing necessary water supply arrangement at 42 (Forty Two) Nos. Anganwadi Center having Electric Power connection within the command area of Memari - II Block under Burdwan Division, P.H.E. Dte. (Part - B). Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER RWS BURDWAN SUB-DIVISION PHE DTE ORD/000130/2021-2022 4548/BWD 06/09/2021 30 BARDHAMAN AQUA ENGINEERING 19.71 11.70 59.36 100
3851 PURBA BARDHAMAN Burdwan Division Extension of PWS to Anganwadi Centers (AWCs) located within the command area of PWSS under Burdwan Division. , SM/10016 Anganwadi Providing necessary water supply arrangement at 55 (Fifty Five) Nos. Anganwadi Center having no Electric Power connection within the command area of Raina - II Block under Burdwan Division, P.H.E. Dte. Assistant Engineer,Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE.,Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000357/2021-2022 69/BWD 06/01/2022 30 PREMANANDA ROY BISWAS 22.28 18.61 83.53 1
3852 PURBA BARDHAMAN Burdwan Division Extension of PWS to Anganwadi Centers (AWCs) located within the command area of PWSS under Burdwan Division. , SM/10016 Anganwadi Providing necessary water supply arrangement at 14 (Fourteen) Nos. Anganwadi Center having no Electric Power connection within the command area of Burdwan - I Block (04 Nos.) & Burdwan - II Block (10 Nos.) under Burdwan Division, P.H.E. Dte._2ND CALL. Assistant Engineer,Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE.,Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000025/2022-2023 2035/BWD 19/04/2022 30 GOUTAM KUMAR MITRA 5.73 4.64 80.98 1
3853 PURBA BARDHAMAN Memari-I Burdwan Division BIJRA PIPED WATER SUPPLY SCHEME , SM/13426 New Material Requisition To Resource Division RTOR000464/2023-2024 3988/BWD 08/09/2023 0 Resource Division 1.04 0.00 0 0
3854 PURBA BARDHAMAN Memari-I Burdwan Division BIJRA PIPED WATER SUPPLY SCHEME , SM/13426 New Material Requisition To Resource Division RTOR000260/2023-2024 2197/BWD 12/05/2023 0 Resource Division 16.43 0.00 0 0
3855 PURBA BARDHAMAN Memari-I Burdwan Division BIJRA PIPED WATER SUPPLY SCHEME , SM/13426 New Material Requisition To Resource Division RTOR000657/2023-2024 5115/BWD 23/11/2023 0 Resource Division 20.46 0.00 0 0
3856 PURBA BARDHAMAN Memari-I Burdwan Division BIJRA PIPED WATER SUPPLY SCHEME , SM/13426 New Continuation work for Supply of one no. Diesel / LPG / CNG driven Motor Cab / Maxi Cab (Air Condition) on hire basis for the office of the Superintending Engineer, Central Circle, P.H.E. Dte." [Period from 01.12.2023 to 31.01.2024] AE(HQs) J.E. 1 BURDWAN ORD/001207/2023-2024 921/AE/HQ 30/11/2023 62 SOURAV JANA 0.80 0.80 100 50
3857 PURBA BARDHAMAN Memari-I Central Mechanical BIJRA PIPED WATER SUPPLY SCHEME , SM/13426 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at SAHAPUR & others water supply scheme under Memari-I Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. ASSISTANT ENGINEER Junior Engineer ORD/000100/2024-2025 2392/CMD 02/08/2024 90 MITRA ENTERPRISE 47.62 0.00 0 0
3858 PURBA BARDHAMAN Memari-I Central Mechanical BIJRA PIPED WATER SUPPLY SCHEME , SM/13426 New New electric connection for Bijra PWSS, PH-2. BILL/01876/2023-2024 BP-2023-24-342 11/01/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 7.97 0.00 0 0
3859 PURBA BARDHAMAN Memari-I Central Mechanical BIJRA PIPED WATER SUPPLY SCHEME , SM/13426 New Additional quotation for new service connection at Bijra PWSS BILL/01027/2024-2025 BP-2024-25-383 14/11/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 0.24 0.00 0 0
3860 PURBA BARDHAMAN Memari-I Central Mechanical BIJRA PIPED WATER SUPPLY SCHEME , SM/13426 New Electric quotation for New Service Connection at Bijra W/S Scehem PH-I. BILL/01779/2023-2024 BP-2023-24-282 26/12/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 6.34 0.00 0 0
3861 PURBA BARDHAMAN Memari-I Burdwan Division BIJRA PIPED WATER SUPPLY SCHEME , SM/13426 New Different works related (sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of different capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site) to DEHA & BIJRA Piped Water Supply Scheme under Memari I Block, District:- Purba Bardhaman [NEW SCHEME] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000092/2023-2024 2215/BWD 15/05/2023 870 CONCORD ENGINEERING 868.87 167.92 19.33 60
3862 PURBA BARDHAMAN Memari-I Central Mechanical BIJRA PIPED WATER SUPPLY SCHEME , SM/13426 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at BIJRA Water Supply Scheme [ Block- MEMARI-1 ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER Junior Engineer ORD/000806/2023-2024 4091/CMD 29/08/2023 491 ORIENTAL ENGINEERING CO. 29.39 0.00 0 100
3863 PURBA BARDHAMAN Memari-II Burdwan Division GHOSHPUR PIPED WATER SUPPLY SCHEME , SM/13947 New Material Requisition To Resource Division RTOR000468/2023-2024 3992/BWD 08/09/2023 0 Resource Division 12.78 0.00 0 0
3864 PURBA BARDHAMAN Memari-II Burdwan Division GHOSHPUR PIPED WATER SUPPLY SCHEME , SM/13947 New Material Requisition To Resource Division RTOR000259/2023-2024 2197/BWD 12/05/2023 0 Resource Division 15.58 0.00 0 0
3865 PURBA BARDHAMAN Memari-II Burdwan Division GHOSHPUR PIPED WATER SUPPLY SCHEME , SM/13947 New Material Requisition To Resource Division RTOR000668/2023-2024 5089/BWD 23/11/2023 0 Resource Division 20.46 0.00 0 0
3866 PURBA BARDHAMAN Memari-II Burdwan Division GHOSHPUR PIPED WATER SUPPLY SCHEME , SM/13947 New Continuation Work Order supply of inspection Vehicle for inspection of different JJM related(schemes)works as and when required including supply of driver & fuel(minimum 8 hours duty per day) and all taxes etc. for Burdwan Sub-Division under Burdwan Division,PHE Dte consider 96.00 Km. run per day (Period from 01-11-2023 to 31-01-2024) ORD/000985/2023-2024 2561/BSD 30/10/2023 66 MD HASIN 0.85 0.00 0 0
3867 PURBA BARDHAMAN Memari-II Central Mechanical GHOSHPUR PIPED WATER SUPPLY SCHEME , SM/13947 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System, Internal House Wiring and Compound lighting arrangement for Tube well No.- 1 & 2 at GHOSHPUR Water Supply Scheme [BLOCK- MEMARI- 2] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER Junior Engineer ORD/001603/2023-2024 1533/CMD 05/03/2024 60 CHOUDHURY ENTERPRISE 28.82 22.94 79.6 75
3868 PURBA BARDHAMAN Memari-II Central Mechanical GHOSHPUR PIPED WATER SUPPLY SCHEME , SM/13947 New New service connection at Ghoshpur PWSS TW -1 BILL/02330/2023-2024 BP-2023-24-446 29/01/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 5.28 0.00 0 0
3869 PURBA BARDHAMAN Memari-II Central Mechanical GHOSHPUR PIPED WATER SUPPLY SCHEME , SM/13947 New NEW SERVICE CONNECTION FOR GHOSHPUR PWSS. BILL/02701/2023-2024 BP-2023-24-566 27/02/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 6.97 0.00 0 0
3870 PURBA BARDHAMAN Memari-II Burdwan Division GHOSHPUR PIPED WATER SUPPLY SCHEME , SM/13947 New GHOSHPUR Piped Water Supply Scheme with sinking of Tube-well, LDS, Rising Main, FHTC, Construction of 250 cum capacity RCC OHR with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drain and internal pathway at different TW site under Memari-II Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER RWS BURDWAN SUB-DIVISION PHE DTE ORD/000110/2023-2024 2299/BWD 19/05/2023 958 MLG CONSTRUCTION 441.87 126.76 28.69 52
3871 PURBA BARDHAMAN Memari-II Burdwan Division GHOSHPUR PIPED WATER SUPPLY SCHEME , SM/13947 New Continuation Work Order for supply of inspection Vehicle for inspection of different JJM related (schemes)works as and when required including supply of driver & fuel(minimum 8 hours duty per day) and all taxes etc. for Burdwan Sub-Division under Burdwan Division,PHE Dte consider 96.00 Km. run per day (Period from 01-11-2024 to 31-01-2025) Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000896/2024-2025 2438/BSD 29/10/2024 66 PARVIN BEGAM 0.85 0.28 32.94 100
3872 PURBA BARDHAMAN Manteswar Burdwan Division GROUND WATER SUPPLY BASED PIPED WATER SUPPLY SCHEME FOR BELENDA PWSS IN MANTESHWAR BLOCK OF PURBA BARDHAMAN DISTRICT UNDER BURDWAN DIVISION PHE DTE , SM/13340 New Material Requisition To Resource Division RTOR000241/2023-2024 2197/BWD 12/05/2023 0 Resource Division 3.10 0.00 0 0
3873 PURBA BARDHAMAN Manteswar Burdwan Division GROUND WATER SUPPLY BASED PIPED WATER SUPPLY SCHEME FOR BELENDA PWSS IN MANTESHWAR BLOCK OF PURBA BARDHAMAN DISTRICT UNDER BURDWAN DIVISION PHE DTE , SM/13340 New Material Requisition To Resource Division RTOR000596/2023-2024 4947/BWD 10/11/2023 0 Resource Division 35.92 0.00 0 0
3874 PURBA BARDHAMAN Manteswar Burdwan Division GROUND WATER SUPPLY BASED PIPED WATER SUPPLY SCHEME FOR BELENDA PWSS IN MANTESHWAR BLOCK OF PURBA BARDHAMAN DISTRICT UNDER BURDWAN DIVISION PHE DTE , SM/13340 New Material Requisition To Resource Division RTOR000541/2023-2024 4309/BWD 29/09/2023 0 Resource Division 11.47 0.00 0 0
3875 PURBA BARDHAMAN Manteswar Burdwan Division GROUND WATER SUPPLY BASED PIPED WATER SUPPLY SCHEME FOR BELENDA PWSS IN MANTESHWAR BLOCK OF PURBA BARDHAMAN DISTRICT UNDER BURDWAN DIVISION PHE DTE , SM/13340 New Continuation work order for supply of 01 (one) No. Diesel driven Motor Cab (Bharat Stage-III) on hire basis for the office of the Assistant Engineer, Durgapur Sub-Divison(Burdwan North), P.H.E. DTE. Govt. of West Bengal (for the period of 01/08/2024 to 30/09/2024) Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer1, Durgapur Sub-Division, PHE Dte. ORD/000552/2024-2025 602/DSD 30/07/2024 61 SUJAUDDIN SEKH 0.80 0.31 38.75 100
3876 PURBA BARDHAMAN Manteswar Burdwan Division GROUND WATER SUPPLY BASED PIPED WATER SUPPLY SCHEME FOR BELENDA PWSS IN MANTESHWAR BLOCK OF PURBA BARDHAMAN DISTRICT UNDER BURDWAN DIVISION PHE DTE , SM/13340 New Continuation work order for supply of 01 (one) No. Diesel driven Motor Cab (Bharat Stage-III) on hire basis for the office of the Assistant Engineer, Durgapur Sub-Divison(Burdwan North), P.H.E. DTE. Govt. of West Bengal (for the period of 01/10/2024 to 30/11/2024) Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer1, Durgapur Sub-Division, PHE Dte. ORD/000839/2024-2025 772/DSD 18/09/2024 61 SUJAUDDIN SEKH 0.80 0.28 35 0
3877 PURBA BARDHAMAN Manteswar Central Mechanical GROUND WATER SUPPLY BASED PIPED WATER SUPPLY SCHEME FOR BELENDA PWSS IN MANTESHWAR BLOCK OF PURBA BARDHAMAN DISTRICT UNDER BURDWAN DIVISION PHE DTE , SM/13340 New NEW SERVICE CONNECTION FOR BELENDA PWSS TW -2. BILL/03099/2023-2024 BP-2023-24-639 15/03/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 4.64 0.00 0 0
3878 PURBA BARDHAMAN Manteswar Central Mechanical GROUND WATER SUPPLY BASED PIPED WATER SUPPLY SCHEME FOR BELENDA PWSS IN MANTESHWAR BLOCK OF PURBA BARDHAMAN DISTRICT UNDER BURDWAN DIVISION PHE DTE , SM/13340 New Quotation for new service connection for Belenda PWSS PH 1. BILL/00228/2024-2025 BP-2024-25-119 29/05/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 10.29 0.00 0 0
3879 PURBA BARDHAMAN Manteswar Central Mechanical GROUND WATER SUPPLY BASED PIPED WATER SUPPLY SCHEME FOR BELENDA PWSS IN MANTESHWAR BLOCK OF PURBA BARDHAMAN DISTRICT UNDER BURDWAN DIVISION PHE DTE , SM/13340 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at Belenda Water Supply Scheme [ Block- Monteshwar ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000911/2023-2024 4175/CMD 29/08/2023 703 SOUNAK ENTERPRISE 28.48 0.00 0 95
3880 PURBA BARDHAMAN Manteswar Burdwan Division GROUND WATER SUPPLY BASED PIPED WATER SUPPLY SCHEME FOR BELENDA PWSS IN MANTESHWAR BLOCK OF PURBA BARDHAMAN DISTRICT UNDER BURDWAN DIVISION PHE DTE , SM/13340 New Different works related (sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of different capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site) to BELENDA, JAMNA, PIPLON & PARGUNA Piped Water Supply Scheme under Manteswar Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer1, Durgapur Sub-Division, PHE Dte. ORD/000689/2023-2024 4388/BWD 05/10/2023 667 AKASH CONSTRUCTION 2,296.40 228.25 9.94 50
3881 PURBA BARDHAMAN Manteswar Central Mechanical GROUND WATER SUPPLY BASED PIPED WATER SUPPLY SCHEME FOR BELENDA PWSS IN MANTESHWAR BLOCK OF PURBA BARDHAMAN DISTRICT UNDER BURDWAN DIVISION PHE DTE , SM/13340 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Sutra & others water supply scheme under Monteswar Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000068/2024-2025 2396/CMD 02/08/2024 455 SINHA ELECTRICALS 78.06 0.00 0 20
3882 PURBA BARDHAMAN Manteswar Burdwan Division GROUND WATER SUPPLY BASED PIPED WATER SUPPLY SCHEME FOR BELENDA PWSS IN MANTESHWAR BLOCK OF PURBA BARDHAMAN DISTRICT UNDER BURDWAN DIVISION PHE DTE , SM/13340 New Continuation work order for supply of 01 (one) No. Diesel driven Motor Cab (Bharat Stage-III) on hire basis for the office of the Assistant Engineer, Durgapur Sub-Divison(Burdwan North), P.H.E. DTE. Govt. of West Bengal (for the period of 01/12/2024 to 31/12/2024) Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer1, Durgapur Sub-Division, PHE Dte. ORD/000994/2024-2025 992/DSD 25/11/2024 61 SUJAUDDIN SEKH 0.40 0.17 42.5 0
3883 PURBA BARDHAMAN Manteswar Central Mechanical GROUND WATER SUPPLY BASED PIPED WATER SUPPLY SCHEME FOR BELENDA PWSS IN MANTESHWAR BLOCK OF PURBA BARDHAMAN DISTRICT UNDER BURDWAN DIVISION PHE DTE , SM/13340 New CONTINUATION ORDER- Hiring of inspection vehicle (Diesel/CNG/LPG Driven)for supervision of site for the office of the Assisatnt Engineer,under CMD,PHE,Dte.[W.E.F-01.04.2025 to 31.05.2025] ASSISTANT ENGINEER Junior Engineer ORD/001173/2024-2025 367/CMSD 26/03/2025 61 PRODYUT GHOSH 0.80 0.80 100 0
3884 PURBA BARDHAMAN Manteswar Burdwan Division GROUND WATER SUPPLY BASED PIPED WATER SUPPLY SCHEME FOR BELENDA PWSS IN MANTESHWAR BLOCK OF PURBA BARDHAMAN DISTRICT UNDER BURDWAN DIVISION PHE DTE , SM/13340 New Continuation for Supply of 01 (one) No. Diesel driven Motor Cab (Bharat Stage-III) on hire basis for the office of the Assistant Engineer, Durgapur Sub-Divison(Burdwan North), P.H.E. DTE. Govt. of West Bengal (for the period of 01/06/2025 to 31/07/2025) ORD/000179/2025-2026 808/DSD 29/05/2025 61 SK ALACK JANDER 0.80 0.00 0 0
3885 PURBA BARDHAMAN Manteswar Burdwan Division GROUND WATER SUPPLY BASED PIPED WATER SUPPLY SCHEME FOR BELENDA PWSS IN MANTESHWAR BLOCK OF PURBA BARDHAMAN DISTRICT UNDER BURDWAN DIVISION PHE DTE , SM/13340 New Continuation for Supply of 01 (one) No. Diesel driven Motor Cab (Bharat Stage-III) on hire basis for the office of the Assistant Engineer, Durgapur Sub-Division (Burdwan North), P.H.E. DTE. Govt. of West Bengal (for the period of 01/04/2025 to 31/05/2025) ORD/001513/2024-2025 483/DSD 21/03/2025 61 SK ALACK JANDER 0.80 0.29 36.25 0
3886 PURBA BARDHAMAN Manteswar Burdwan Division GROUND WATER SUPPLY BASED PIPED WATER SUPPLY SCHEME FOR BELENDA PWSS IN MANTESHWAR BLOCK OF PURBA BARDHAMAN DISTRICT UNDER BURDWAN DIVISION PHE DTE , SM/13340 New Supply of 01 (one) No. Diesel driven Motor Cab (Bharat Stage-III) on hire basis for the office of the Assistant Engineer, Durgapur Sub-Divison(Burdwan North), P.H.E. DTE. Govt. of West Bengal (for the period of 01/02/2025 to 31/03/2025) ORD/001508/2024-2025 142/DSD 24/01/2025 59 SK ALACK JANDER 0.80 0.31 38.75 0
3887 PURBA BARDHAMAN Manteswar Burdwan Division GROUND WATER SUPPLY BASED PIPED WATER SUPPLY SCHEME FOR BELENDA PWSS IN MANTESHWAR BLOCK OF PURBA BARDHAMAN DISTRICT UNDER BURDWAN DIVISION PHE DTE , SM/13340 New Work Order for "DESIGNING,MAKING AND ERECTION OF SIGN BOARD FOR SAJAL GRAM IN ¿¿1 No...VILLAGE, ¿MANTESWAR BLOCK UNDER KALNA SUB DIVISION WITHIN BURDWAN DIVISION PHE DTE. (3nos board)" Assistant Engineer Junior Engineer, R.W.S. Burdwan Sub Division, P.H.E. Dt ORD/001424/2024-2025 1920/KSD 02/12/2024 10 OMKAR ENTERPRISE 0.42 0.00 0 100
3888 PURBA BARDHAMAN Manteswar Burdwan Division GROUND WATER SUPPLY BASED PIPED WATER SUPPLY SCHEME FOR BELENDA PWSS IN MANTESHWAR BLOCK OF PURBA BARDHAMAN DISTRICT UNDER BURDWAN DIVISION PHE DTE , SM/13340 New Continuation for Supply of 01 (one) No. Diesel driven Motor Cab (Bharat Stage-III) on hire basis for the office of the Assistant Engineer, Durgapur Sub-Division(Burdwan North), P.H.E. DTE. Govt. of West Bengal (for the period of 01/10/2025 to 30/11/2025) ORD/000752/2025-2026 1248/DSD 23/09/2025 61 SK ALACK JANDER 0.80 0.00 0 0
3889 PURBA BARDHAMAN Manteswar Burdwan Division GROUND WATER SUPPLY BASED PIPED WATER SUPPLY SCHEME FOR BELENDA PWSS IN MANTESHWAR BLOCK OF PURBA BARDHAMAN DISTRICT UNDER BURDWAN DIVISION PHE DTE , SM/13340 New Continuation for Supply of 01 (one) No. Diesel driven Motor Cab (Bharat Stage-III) on hire basis for the office of the Assistant Engineer, Durgapur Sub-Divison(Burdwan North), P.H.E. DTE. Govt. of West Bengal (for the period of 01/08/2025 to 30/09/2025) ORD/000516/2025-2026 1076/DSD 30/07/2025 63 SK ALACK JANDER 0.80 0.00 0 0
3890 PURBA BARDHAMAN Manteswar Central Mechanical Ground Water Supply Based Piped Water Supply Scheme For KHULE PWSS in Manteshwar Block of Purab Burdwan District under Burdwan Division, PHE Dte , SM/14425 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at Khule Water Supply Scheme [ Block- Monteshwar ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000923/2023-2024 4186/CMD 29/08/2023 30 CINZANO 29.10 0.00 0 0
3891 PURBA BARDHAMAN Manteswar Burdwan Division Ground Water Supply Based Piped Water Supply Scheme For KHULE PWSS in Manteshwar Block of Purab Burdwan District under Burdwan Division, PHE Dte , SM/14425 New Material Requisition To Resource Division RTOR000046/2023-2024 1962/BWD 25/04/2023 0 Resource Division 56.68 0.00 0 0
3892 PURBA BARDHAMAN Manteswar Burdwan Division Ground Water Supply Based Piped Water Supply Scheme For KHULE PWSS in Manteshwar Block of Purab Burdwan District under Burdwan Division, PHE Dte , SM/14425 New Material Requisition To Resource Division RTOR000180/2023-2024 2155/BWD 10/05/2023 0 Resource Division 18.09 0.00 0 0
3893 PURBA BARDHAMAN Manteswar Burdwan Division Ground Water Supply Based Piped Water Supply Scheme For KHULE PWSS in Manteshwar Block of Purab Burdwan District under Burdwan Division, PHE Dte , SM/14425 New Work Order for "CONSTRUCTION OF TEMPORARY KIOSK FOR THE NECESSARY ARRANGEMENT OF ELECTRIFICATION OF TUBEWELL FOR ANUKHAL PWSS UNDER KALNA SUB-DIVISION UNDER BURDWAN DIVISION, PHE DTE." Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000962/2024-2025 1236/KSD 30/09/2024 15 SINGHA ROY AND CO. 0.66 0.00 0 0
3894 PURBA BARDHAMAN Manteswar Burdwan Division Ground Water Supply Based Piped Water Supply Scheme For KHULE PWSS in Manteshwar Block of Purab Burdwan District under Burdwan Division, PHE Dte , SM/14425 New Work order for " CONSTRUCTION OF TEMPORARY KIOSK FOR THE NECESSARY ARRANGEMENT OF ELECTRIFICATION OF TUBEWELL FOR DOGACHHIA PWSS UNDER KALNA SUBDIVISION UNDER BURDWAN DIVISION, PHE DTE." Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000963/2024-2025 1237/KSD 30/09/2024 15 MITRA CONSTRUCTION 0.66 0.00 0 0
3895 PURBA BARDHAMAN Manteswar Central Mechanical Ground Water Supply Based Piped Water Supply Scheme For KHULE PWSS in Manteshwar Block of Purab Burdwan District under Burdwan Division, PHE Dte , SM/14425 New NEW SERVICE CONNECTION FOR KHULE PWSS. BILL/02696/2023-2024 BP-2023-24-569 27/02/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.69 0.00 0 0
3896 PURBA BARDHAMAN Manteswar Central Mechanical Ground Water Supply Based Piped Water Supply Scheme For KHULE PWSS in Manteshwar Block of Purab Burdwan District under Burdwan Division, PHE Dte , SM/14425 New NEW SERVICE CONNECTION FOR KHULE PWSS. BILL/02697/2023-2024 BP-2023-24-570 27/02/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 13.79 0.00 0 0
3897 PURBA BARDHAMAN Manteswar Burdwan Division Ground Water Supply Based Piped Water Supply Scheme For KHULE PWSS in Manteshwar Block of Purab Burdwan District under Burdwan Division, PHE Dte , SM/14425 New KHULE Piped Water Supply Scheme with sinking of Tube-well, LDS,Rising Main, FHTC, Construction of 300 cum capacity RCC OHR with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drain and internal pathway at different TW site under Manteswar Block, District:- Purba-Bardhaman [NEW SCHEME]. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000004/2023-2024 1618/BWD 05/04/2023 365 AZAD ENTERPRISE 598.72 386.02 64.47 55
3898 PURBA BARDHAMAN Manteswar Central Mechanical Ground Water Supply Based Piped Water Supply Scheme For KHULE PWSS in Manteshwar Block of Purab Burdwan District under Burdwan Division, PHE Dte , SM/14425 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Sutra & others water supply scheme under Monteswar Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000068/2024-2025 2396/CMD 02/08/2024 455 SINHA ELECTRICALS 78.06 0.00 0 20
3899 PURBA BARDHAMAN Manteswar Burdwan Division Ground Water Supply Based Piped Water Supply Scheme For KHULE PWSS in Manteshwar Block of Purab Burdwan District under Burdwan Division, PHE Dte , SM/14425 New Pipeline laying by HDD method and different types of balance works in connection with different Augmentation & New Scheme [(SM/ 08103), (SM/13413), (SM/15587), (SM/16035), (SM/16287), (SM/16029), (SM/15581), (SM/14437), (SM/16028), (SM/16036) & (SM/14425)] within Kalna Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer ORD/001270/2024-2025 849/BWD 05/03/2025 180 S.P. CONSTRUCTION 683.30 0.00 0 0
3900 PURBA BARDHAMAN Manteswar Burdwan Division Ground Water Supply Based Piped Water Supply Scheme For KHULE PWSS in Manteshwar Block of Purab Burdwan District under Burdwan Division, PHE Dte , SM/14425 New Work Order for "CONSTRUCTION OF TEMPORARY KIOSK FOR THE NECESSARY ARRANGEMENT OF ELECTRIFICATION OF TUBEWELL FOR KHULE PWSS UNDER KALNA SUB-DIVISION UNDER BURDWAN DIVISION, PHE DTE.". Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/001289/2024-2025 1232/KSD 27/09/2024 15 WESTON ENGINEERS 0.66 0.00 0 100
3901 PURBA BARDHAMAN Purbasthali-I Burdwan Division KONRAPUR PIPED WATER SUPPLY SCHEME , SM/13419 New Material Requisition To Resource Division RTOR000471/2023-2024 3995/BWD 08/09/2023 0 Resource Division 11.87 0.00 0 0
3902 PURBA BARDHAMAN Purbasthali-I Burdwan Division KONRAPUR PIPED WATER SUPPLY SCHEME , SM/13419 New Material Requisition To Resource Division RTOR000161/2023-2024 2155/BWD 10/05/2023 0 Resource Division 8.28 0.00 0 0
3903 PURBA BARDHAMAN Purbasthali-I Burdwan Division KONRAPUR PIPED WATER SUPPLY SCHEME , SM/13419 New Different works related (sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of different capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site) to KONRAPUR & MASGARIA Piped Water Supply Scheme under Purbasthali-I Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000026/2023-2024 1765/BWD 17/04/2023 365 M/S ASHA CONSTRUCTION 710.72 123.45 17.37 43
3904 PURBA BARDHAMAN Purbasthali-I Central Mechanical KONRAPUR PIPED WATER SUPPLY SCHEME , SM/13419 New Supply & Installation of Submersible Pumping Machinery , Voltage Stabilizer, Chlorination System and Internal House wiring for Tube well no.- 1 & 2 at KONRAPUR Water Supply Scheme [Block-PURBASTHALI-1] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/001056/2023-2024 4198/CMD 29/08/2023 30 MITRA ASSOCIATES 21.47 9.64 44.9 50
3905 PURBA BARDHAMAN Purbasthali-I Burdwan Division KONRAPUR PIPED WATER SUPPLY SCHEME , SM/13419 New Material Requisition To Resource Division RTOR000800/2023-2024 309/BWD 24/01/2024 0 Resource Division 16.10 0.00 0 0
3906 PURBA BARDHAMAN Purbasthali-I Central Mechanical KONRAPUR PIPED WATER SUPPLY SCHEME , SM/13419 New NEW SERVICE CONNECTION FOR KONRAPUR PWSS BILL/02694/2023-2024 BP-2023-24-567 27/02/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.54 0.00 0 0
3907 PURBA BARDHAMAN Purbasthali-I Central Mechanical KONRAPUR PIPED WATER SUPPLY SCHEME , SM/13419 New NEW SERVICE CONNECTION FOR KONRAPUR PWSS. BILL/02695/2023-2024 BP-2023-24-568 27/02/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 12.76 0.00 0 0
3908 PURBA BARDHAMAN Purbasthali-I Central Mechanical KONRAPUR PIPED WATER SUPPLY SCHEME , SM/13419 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Haripur & others water supply scheme under purbasthali 1 Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000072/2024-2025 2397/CMD 02/08/2024 90 CHATTERJEE ENTERPRISE 48.60 0.00 0 30
3909 PURBA BARDHAMAN Purbasthali-I Burdwan Division KONRAPUR PIPED WATER SUPPLY SCHEME , SM/13419 New Different types of balance works involve in connection with KONRAPUR (SM/13419) & MASGORIA (SM/13318) Piped water supply scheme under Purbasthali-I Block within Kalna Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/001028/2024-2025 142/BWD 08/01/2025 120 M/S ASHA CONSTRUCTION 65.74 0.00 0 0
3910 PURBA BARDHAMAN Khandaghosh Burdwan Division KAMALPUR PIPED WATER SUPPLY SCHEME , SM/13942 New Material Requisition To Resource Division RTOR000106/2023-2024 1965/BWD 26/04/2023 0 Resource Division 5.64 0.00 0 0
3911 PURBA BARDHAMAN Khandaghosh Burdwan Division KAMALPUR PIPED WATER SUPPLY SCHEME , SM/13942 New Material Requisition To Resource Division RTOR000193/2023-2024 2155/BWD 10/05/2023 0 Resource Division 14.43 0.00 0 0
3912 PURBA BARDHAMAN Khandaghosh Burdwan Division KAMALPUR PIPED WATER SUPPLY SCHEME , SM/13942 New Material Requisition To Resource Division RTOR000306/2023-2024 2197/BWD 12/05/2023 0 Resource Division 19.29 0.00 0 0
3913 PURBA BARDHAMAN Khandaghosh Burdwan Division KAMALPUR PIPED WATER SUPPLY SCHEME , SM/13942 New Material Requisition To Resource Division RTOR000720/2023-2024 5266/BWD 30/11/2023 0 Resource Division 21.07 0.00 0 0
3914 PURBA BARDHAMAN Khandaghosh Burdwan Division KAMALPUR PIPED WATER SUPPLY SCHEME , SM/13942 New Continuation order for Supply of 01(one) No. Diesel Driven Motor Cab (Bharat Stage-II) on hire basis for the office of the Assistant Engineer, Durgapur Sub-Division (Burdwan North) P.H.E. Dte. Govt. of West Bengal (for the period of 01/01/2024 to 31/05/2024) Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer1, Durgapur Sub-Division, PHE Dte. ORD/001180/2023-2024 995/DSD 29/12/2023 183 SUJAUDDIN SEKH 2.00 0.40 20 60
3915 PURBA BARDHAMAN Khandaghosh Central Mechanical KAMALPUR PIPED WATER SUPPLY SCHEME , SM/13942 New NEW SERVICE CONNECTION FOR KAMALPUR PWSS PH-2. BILL/02874/2023-2024 BP-2023-24-602 06/03/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 2.80 0.00 0 0
3916 PURBA BARDHAMAN Khandaghosh Central Mechanical KAMALPUR PIPED WATER SUPPLY SCHEME , SM/13942 New NEW SERVICE CONNECTION FOR KAMALPUR PWSS PH-1. BILL/02870/2023-2024 BP-2023-24-601 06/03/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 2.95 0.00 0 0
3917 PURBA BARDHAMAN Khandaghosh Burdwan Division KAMALPUR PIPED WATER SUPPLY SCHEME , SM/13942 New Different works related (sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of different capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site) to SARANGA & KAMALPUR Piped Water Supply Scheme under Khandaghosh Block, District:- Purba Bardhaman [NEW SCHEME] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer1, Durgapur Sub-Division, PHE Dte.,Junior Engineer2, Durgapur Sub-Division, PHE Dte. ORD/000082/2023-2024 2078/BWD 04/05/2023 698 KHAN ENTERPRISE 820.73 381.84 46.52 42
3918 PURBA BARDHAMAN Khandaghosh Central Mechanical KAMALPUR PIPED WATER SUPPLY SCHEME , SM/13942 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at Kamalpur Water Supply Scheme [ Block- Khandoghosh ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER Junior Engineer ORD/000733/2023-2024 4043/CMD 29/08/2023 30 M/S. SWAPAN BANERJEE 28.97 22.93 79.15 100
3919 PURBA BARDHAMAN Khandaghosh Central Mechanical KAMALPUR PIPED WATER SUPPLY SCHEME , SM/13942 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at KHEJURHATI & others water supply scheme under Khandoghosh Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman ASSISTANT ENGINEER Junior Engineer ORD/000071/2024-2025 2391/CMD 02/08/2024 90 C.M. ENTERPRISE 45.81 0.00 0 10
3920 PURBA BARDHAMAN Khandaghosh Central Mechanical KAMALPUR PIPED WATER SUPPLY SCHEME , SM/13942 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Manganpur & others water supply scheme under Purbasthali 1 Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000714/2024-2025 2979/CMD 25/11/2024 90 H.K. DAS & CO. 53.27 0.00 0 0
3921 PURBA BARDHAMAN Raina-II Burdwan Division Katnabil Piped Water Supply Scheme , SM/13338 New Material Requisition To Resource Division RTOR000375/2023-2024 2197/BWD 12/05/2023 0 Resource Division 4.23 0.00 0 0
3922 PURBA BARDHAMAN Raina-II Burdwan Division Katnabil Piped Water Supply Scheme , SM/13338 New Material Requisition To Resource Division RTOR000512/2023-2024 4036/BWD 08/09/2023 0 Resource Division 4.83 0.00 0 0
3923 PURBA BARDHAMAN Raina-II Burdwan Division Katnabil Piped Water Supply Scheme , SM/13338 New Material Requisition To Resource Division RTOR000673/2023-2024 5050/BWD 23/11/2023 0 Resource Division 20.46 0.00 0 0
3924 PURBA BARDHAMAN Raina-II Central Mechanical Katnabil Piped Water Supply Scheme , SM/13338 New New service connection charges for Katnabil PWSS TW-1 BILL/01700/2023-2024 BP-2023-24-231 20/11/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 7.27 0.00 0 0
3925 PURBA BARDHAMAN Raina-II Central Mechanical Katnabil Piped Water Supply Scheme , SM/13338 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Satinandi,Sanko & others water supply scheme under Galsi-1 Block ; Serpur, Uchalan & others water supply scheme under Raina-2 Block and maro, loapur & others water supply scheme under Galsi-2 block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000397/2024-2025 2751/CMD 24/09/2024 90 ORIENTAL ENGINEERING CO. 88.42 0.00 0 0
3926 PURBA BARDHAMAN Raina-II Central Mechanical Katnabil Piped Water Supply Scheme , SM/13338 New New Service connection for Katnabil W/S Scheme PH No.-II BILL/01800/2023-2024 BP-2023-24-300 30/12/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 10.15 0.00 0 0
3927 PURBA BARDHAMAN Raina-II Burdwan Division Katnabil Piped Water Supply Scheme , SM/13338 New Different works related (sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of different capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site) to UCHALAN, CHAK CHANDAN, SERPUR & KATNABIL Piped Water Supply Scheme under Raina II Block, District:- Purba Bardhaman [NEW SCHEME] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000367/2023-2024 3076/BWD 18/07/2023 806 SK ALIM 1,307.56 199.38 15.25 75
3928 PURBA BARDHAMAN Ketugram-I Burdwan Division RAJUR PIPED WATER SUPPLY SCHEME , SM/15238 New Material Requisition To Resource Division RTOR000057/2023-2024 1962/BWD 25/04/2023 0 Resource Division 16.04 0.00 0 0
3929 PURBA BARDHAMAN Ketugram-I Burdwan Division RAJUR PIPED WATER SUPPLY SCHEME , SM/15238 New Material Requisition To Resource Division RTOR000182/2023-2024 2155/BWD 10/05/2023 0 Resource Division 10.90 0.00 0 0
3930 PURBA BARDHAMAN Ketugram-I Burdwan Division RAJUR PIPED WATER SUPPLY SCHEME , SM/15238 New Material Requisition To Resource Division RTOR000489/2023-2024 4013/BWD 08/09/2023 0 Resource Division 15.19 0.00 0 0
3931 PURBA BARDHAMAN Ketugram-I Burdwan Division RAJUR PIPED WATER SUPPLY SCHEME , SM/15238 New Material Requisition To Resource Division RTOR000623/2023-2024 4881/BWD 10/11/2023 0 Resource Division 29.60 0.00 0 0
3932 PURBA BARDHAMAN Ketugram-I Central Mechanical RAJUR PIPED WATER SUPPLY SCHEME , SM/15238 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Rajur & others water supply scheme under Ketugram-I Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. Driller In-Charge Junior Engineer ORD/000098/2024-2025 2407/CMD 02/08/2024 90 M.S. ENTERPRISE 82.29 0.00 0 0
3933 PURBA BARDHAMAN Ketugram-I Central Mechanical RAJUR PIPED WATER SUPPLY SCHEME , SM/15238 New Quotation for new service connection at RAJUR W/S Scheme PH-II. BILL/01813/2023-2024 BP-2023-24-317 30/12/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.22 0.00 0 0
3934 PURBA BARDHAMAN Ketugram-I Central Mechanical RAJUR PIPED WATER SUPPLY SCHEME , SM/15238 New New service connection charges for Rajur PWSS TW-1 BILL/01766/2023-2024 BP-2023-24-278 21/12/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.15 0.00 0 0
3935 PURBA BARDHAMAN Ketugram-I Burdwan Division RAJUR PIPED WATER SUPPLY SCHEME , SM/15238 New RAJUR Piped Water Supply Scheme with sinking of Tube-well, LDS, Rising Main, FHTC, Construction of 350 cum capacity RCC OHR with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drain and internal pathway at different TW site under KETUGRAM-I Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer JUNIOR ENGINEER R.W.S. BURDWAN SUB-DIVISION PHE DTE ORD/000007/2023-2024 1701/BWD 12/04/2023 365 TEKNO ENTERPRISE 471.14 430.57 91.39 77
3936 PURBA BARDHAMAN Ketugram-I Burdwan Division RAJUR PIPED WATER SUPPLY SCHEME , SM/15238 New Continuation work order for Hiring of one no Diesel Motor Cab (BS-VI) including the cost of fuel . mobile & other charges for the inspection of the different projects of JJM for the office of the Assistant Engineer, Katwa Sub-Division, PHE Dte. (Period:- 01/09/2025 to 28/02/2026) ORD/000723/2025-2026 1907/KTS 01/09/2025 181 HAMID SK 1.84 0.00 0 0
3937 PURBA BARDHAMAN Kalna-II Burdwan Division BARA BAHARKULI PIPED WATER SUPPLY SCHEME. , SM/15581 New Material Requisition To Resource Division RTOR000050/2023-2024 1962/BWD 25/04/2023 0 Resource Division 10.04 0.00 0 0
3938 PURBA BARDHAMAN Kalna-II Burdwan Division BARA BAHARKULI PIPED WATER SUPPLY SCHEME. , SM/15581 New Material Requisition To Resource Division RTOR000200/2023-2024 2155/BWD 10/05/2023 0 Resource Division 10.94 0.00 0 0
3939 PURBA BARDHAMAN Kalna-II Central Mechanical BARA BAHARKULI PIPED WATER SUPPLY SCHEME. , SM/15581 New New service connection charges for Bara Baharkuli PWSS TW-2 BILL/01668/2023-2024 BP-2023-24-219 10/11/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 6.15 0.00 0 0
3940 PURBA BARDHAMAN Kalna-II Burdwan Division BARA BAHARKULI PIPED WATER SUPPLY SCHEME. , SM/15581 New BARA BAHARKULI Piped Water Supply Scheme with sinking of Tube-well, LDS, Rising Main, FHTC, Construction of 100 cum capacity RCC OHR with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drain and internal pathway at different TW site under Kalna-II Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000178/2023-2024 2597/BWD 02/06/2023 365 INVENT ENGINEERS CO. OPERATIVE SOCIETY LTD. 236.30 145.52 61.58 65
3941 PURBA BARDHAMAN Kalna-II Burdwan Division BARA BAHARKULI PIPED WATER SUPPLY SCHEME. , SM/15581 New Material Requisition To Resource Division RTOR000785/2023-2024 328/BWD 24/01/2024 0 Resource Division 24.62 0.00 0 0
3942 PURBA BARDHAMAN Kalna-II Central Mechanical BARA BAHARKULI PIPED WATER SUPPLY SCHEME. , SM/15581 New Quotation for new electric service connection at Bara Baharkhuli PH NO.-1 BILL/01747/2023-2024 BP-2023-24-268 11/12/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 2.87 0.00 0 0
3943 PURBA BARDHAMAN Kalna-II Burdwan Division BARA BAHARKULI PIPED WATER SUPPLY SCHEME. , SM/15581 New Restoration work of Barabaharkuli to Badla village road with a bridge over river Behula road from 0.0 km to 1.3 km and 1.8 km to 2.2 km damadged due to laying of underground water pipeline by PHE with box cutting and jhama with moorum consolidation under kalna highway subdivision of Burdwan south highway division ,P.W(Roads)dte ,during the year 2023-2024 BILL/00645/2024-2025 825/JJM 13/09/2024 0 EXECUTIVE ENGINEER BURDWAN SOUTH HIGHWAY DIVISION P.W. (ROADS) DTE. 5.36 0.00 0 0
3944 PURBA BARDHAMAN Kalna-II Central Mechanical BARA BAHARKULI PIPED WATER SUPPLY SCHEME. , SM/15581 New Supply & Installation of Submersible Pumping Machinery , Voltage Stabilizer, Chlorination system and internal House wiring for Tube well no.- 1 & 2 at BARABAHARKULI Water Supply Scheme [Block - KALNA-2] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER Junior Engineer ORD/000898/2023-2024 4162/CMD 29/08/2023 733 J.S. CONSTRUCTION. 21.33 0.00 0 90
3945 PURBA BARDHAMAN Kalna-II Burdwan Division BARA BAHARKULI PIPED WATER SUPPLY SCHEME. , SM/15581 New Pipeline laying by HDD method and different types of balance works in connection with different Augmentation & New Scheme [(SM/ 08103), (SM/13413), (SM/15587), (SM/16035), (SM/16287), (SM/16029), (SM/15581), (SM/14437), (SM/16028), (SM/16036) & (SM/14425)] within Kalna Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer ORD/001270/2024-2025 849/BWD 05/03/2025 180 S.P. CONSTRUCTION 683.30 0.00 0 0
3946 PURBA BARDHAMAN Ketugram-I Burdwan Division CHAKDAHA PIPED WATER SUPPLY SCHEME , SM/15582 New Material Requisition To Resource Division RTOR000191/2023-2024 2155/BWD 10/05/2023 0 Resource Division 4.39 0.00 0 0
3947 PURBA BARDHAMAN Ketugram-I Burdwan Division CHAKDAHA PIPED WATER SUPPLY SCHEME , SM/15582 New Material Requisition To Resource Division RTOR000397/2023-2024 3843/BWD 01/09/2023 0 Resource Division 1.09 0.00 0 0
3948 PURBA BARDHAMAN Ketugram-I Burdwan Division CHAKDAHA PIPED WATER SUPPLY SCHEME , SM/15582 New Material Requisition To Resource Division RTOR000581/2023-2024 4895/BWD 10/11/2023 0 Resource Division 4.76 0.00 0 0
3949 PURBA BARDHAMAN Ketugram-I Burdwan Division CHAKDAHA PIPED WATER SUPPLY SCHEME , SM/15582 New CHAKDAHA Piped Water Supply Scheme with sinking of Tube-well, LDS, Rising Main, FHTC, Construction of switch rooms & boundary walls with gates and land development, drain and internal pathway at different TW site under KETUGRAM -I Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer JUNIOR ENGINEER R.W.S. BURDWAN SUB-DIVISION PHE DTE ORD/000080/2023-2024 2071/BWD 04/05/2023 120 CHAKRABORTY PROJECTS 85.35 60.60 71 76
3950 PURBA BARDHAMAN Ketugram-I Central Mechanical CHAKDAHA PIPED WATER SUPPLY SCHEME , SM/15582 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Rajur & others water supply scheme under Ketugram-I Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. Driller In-Charge Junior Engineer ORD/000098/2024-2025 2407/CMD 02/08/2024 90 M.S. ENTERPRISE 82.29 0.00 0 0
3951 PURBA BARDHAMAN Ketugram-I Central Mechanical CHAKDAHA PIPED WATER SUPPLY SCHEME , SM/15582 New New service connection charges for Chakdaha PWSS TW-1 BILL/01765/2023-2024 BP-2023-24-279 21/12/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 4.10 0.00 0 0
3952 PURBA BARDHAMAN Ketugram-I Central Mechanical CHAKDAHA PIPED WATER SUPPLY SCHEME , SM/15582 New Supply & Installation of Submersible Pumping Machinery , Voltage Stabilizer, Chlorination system and internal House wiring for Tube well no.- 1 & 2 at CHAKDAHA [KETUGRAM-I] Water Supply Scheme under CMD, PHE Dte., Dist.- Purba-Bardhaman. Driller In-Charge Junior Engineer ORD/000890/2023-2024 4153/CMD 29/08/2023 640 AMUSAR IMPEX PVT. LTD. 21.26 9.69 45.58 47
3953 PURBA BARDHAMAN Ketugram-I Burdwan Division CHAKDAHA PIPED WATER SUPPLY SCHEME , SM/15582 New Balance Work For OHR, Extension Of Pipeline To Provide FHTC With Sinking Of Tube Well, Construction Of Pump House, Boundary Wall, Land Development, Plinth Protection For Pump House, Approach Road & Other Related Work Under Bakalsa, Chakdaha, Ehaipur, Khatundi And Ketugram (Zone-I) Part-A & B PWSS Under Katwa Sub Division, Block- Ketugram-I, Burdwan Division PHE Dte. Assistant Engineer JUNIOR ENGINEER R.W.S. BURDWAN SUB-DIVISION PHE DTE ORD/000288/2024-2025 2741/BWD 12/07/2024 415 M/S M.M. ENTERPRISE 205.15 6.98 3.4 65
3954 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Hatgobindapur Piped Water Supply Scheme , SM/06971 Retrofitting Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Hatgobindapur village of Hatgobindapur Piped Water Supply Scheme within Burdwan Sub-Divn. under Burdwan Division, PHE. Dte. [Phase - I] [GROUP : ¿6A¿] (T.R. No. 156/BWD/2020-21) ORD/000152/2020-2021 2743/BWD 10/08/2020 30 M/S ASHA CONSTRUCTION 4.92 9.84 200 1
3955 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Hatgobindapur Piped Water Supply Scheme , SM/06971 Retrofitting Continuation work order for Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Hatgobindapur village of Hatgobindapur piped water supply scheme within Burdwan Sub-Division under Burdwan Division, PHE Dte. [Phase-I](Tr No.-317/BWD/2020-21) Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. Junior Engineer, Burdwan Sadar Sub-Division ORD/000347/2020-2021 3702/BWD 05/10/2020 30 M/S ASHA CONSTRUCTION 4.92 9.84 200 1
3956 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Hatgobindapur Piped Water Supply Scheme , SM/06971 Retrofitting Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Banagram village of Hatgobindapur Piped Water Supply Scheme within Burdwan Sub-Divn. under Burdwan Division, PHE. Dte. [Phase - I] [GROUP : ¿6B¿] (T.R. No.-155/BWD/2020-21) ORD/000153/2020-2021 2744/BWD 10/08/2020 30 M/S ASHA CONSTRUCTION 4.92 4.92 100 1
3957 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Hatgobindapur Piped Water Supply Scheme , SM/06971 Retrofitting Continuation work order for Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Hatgobindapur village (Part) of Hatgobindapur Piped Water Supply Scheme within Burdwan Sub-Divn. under Burdwan Division, PHE. Dte. [SL. No. : 01] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. Junior Engineer, Burdwan Sadar Sub-Division ORD/000122/2021-2022 4390/BWD 31/08/2021 15 M/S ASHA CONSTRUCTION 4.86 4.77 98.15 1
3958 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Hatgobindapur Piped Water Supply Scheme , SM/06971 Retrofitting Extension of UPVC distribution pipeline in connection with FHTC for Hatgobindapur and its adjoining mouzas water supply scheme at Bardhaman-II Development Block under Burdwan Division, PHE Dte.[Gr-A] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. Junior Engineer, Burdwan Sadar Sub-Division ORD/000688/2021-2022 989/BSD 30/07/2021 30 M/S ASHA CONSTRUCTION 4.82 4.74 98.34 1
3959 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Hatgobindapur Piped Water Supply Scheme , SM/06971 Retrofitting Construction of boundary wall at Pump house no - 3 Site of Hatgobindapur Water Supply Scheme under Bardhaman-II Dev. Block of Burdwan Division, PHE Dte. (Length -40.00 Mtr, Col-16 Nos). Group : B Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. Junior Engineer, Burdwan Sadar Sub-Division ORD/000052/2022-2023 701/BSD 27/04/2022 45 ANIRUDDHA FARUQUE 2.61 2.61 100 1
3960 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Hatgobindapur Piped Water Supply Scheme , SM/06971 Retrofitting Laying of interconnection of the Pump No.-3 with distribution line 100 mm dia for Hatgobindapur piped water supply scheme of Burdwan-II Block under Burdwan Division, PHE Dte.[Gr.-B] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. Junior Engineer, Burdwan Sadar Sub-Division ORD/000702/2021-2022 1027/BSD 05/08/2021 30 ANWESHA CONSTRUCTION 1.67 1.50 89.82 1
3961 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Hatgobindapur Piped Water Supply Scheme , SM/06971 Retrofitting Sinking of additional Tube well 250 x 200 mm dia Tube well 150 mtr depth by D.R. Rig method using UPVC pipe (CD) and fibre glass strainer for Hatgobindapur piped water supply scheme (3rd tube well site), Block-Burdwan-II under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. Junior Engineer, Burdwan Sadar Sub-Division ORD/000982/2020-2021 1493/BWD 18/02/2021 30 C.M. ENTERPRISE 8.68 6.99 80.53 1
3962 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Hatgobindapur Piped Water Supply Scheme , SM/06971 Retrofitting Supply of materials for different water supply scheme under Burdwan Division, PHE Dte. VCH/001246/2021-2022 900/DW 03/02/2022 0 EXECUTIVE ENGINEER, RESOURCES DIVISION, P.H.E. DTE. 34.54 0.00 0 0
3963 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Hatgobindapur Piped Water Supply Scheme , SM/06971 Retrofitting Providing leftout water tap connection in different villages for 100% coverage in Sajal Gram from existing distribution system within scheme jurisdiction of different Piped Water Supply Schemes within Burdwan ¿ II Block under Burdwan Division, PHE. Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000416/2021-2022 385/BWD 20/01/2022 30 BISWAS ENTERPRISE 11.97 3.71 30.99 100
3964 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Hatgobindapur Piped Water Supply Scheme , SM/06971 Retrofitting Additional work for Construction of boundary wall at Pump house no - 3 Site of Hatgobindapur Water Supply Scheme under Bardhaman-II Dev. Block of Burdwan Division, PHE Dte. (Length -18.00 Mtr, Col-2 Nos). Group - A. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. Junior Engineer, Burdwan Sadar Sub-Division ORD/000061/2022-2023 722/BSD 02/05/2022 30 MOHAMMAD ISSA 1.48 1.48 100 1
3965 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Hatgobindapur Piped Water Supply Scheme , SM/06971 Retrofitting Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of HATGOBINDAPUR Piped Water Supply Scheme and its adjoining mouzas at Burdwan - II Block under Burdwan Division, PHE. Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. Junior Engineer, Burdwan Sadar Sub-Division ORD/000054/2022-2023 2232/BWD 29/04/2022 30 M/S ASHA CONSTRUCTION 19.32 18.67 96.64 1
3966 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Hatgobindapur Piped Water Supply Scheme , SM/06971 Retrofitting Left out FHTC (Hatgobindapur, Banagram, Ramnagar & Hatkanda village) of HATGOBINDAPUR PWSS under Burdwan-II Block of Burdwan Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. Junior Engineer, Burdwan Sadar Sub-Division ORD/000116/2023-2024 2302/BWD 19/05/2023 30 M/S SAYAN CHAKRABORTY 9.60 9.63 100.31 100
3967 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Hatgobindapur Piped Water Supply Scheme , SM/06971 Retrofitting Material Requisition To Resource Division RTOR000016/2021-2022 6800/BWD 07/12/2021 0 Resource Division 2.85 0.00 0 0
3968 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Hatgobindapur Piped Water Supply Scheme , SM/06971 Retrofitting Providing left out FHTC for 100% covarage in different village within Hatgobindapur PWSS , Bardhhaman-II Development Block under Burdwan Division, PHE Dte Junior Engineer, Burdwan Sadar Sub-Division ORD/000293/2024-2025 1275/BSD 12/07/2024 45 PAL CONSTRUCTION 4.78 0.00 0 0
3969 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Hatgobindapur Piped Water Supply Scheme , SM/06971 Retrofitting Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Hatgobindapur village (Part) of Hatgobindapur Piped Water Supply Scheme within Burdwan Sub-Divn. under Burdwan Division, PHE. Dte. [SL. No. : 01] ORD/000465/2020-2021 1413/BWD 18/02/2021 15 M/S ASHA CONSTRUCTION 4.86 9.71 199.79 0
3970 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Hatgobindapur Piped Water Supply Scheme , SM/06971 Retrofitting Construction of Pump House cum chlorine room without sanitary and water supply arrangement at 3rd tube well site (Size-3.60 mtr x 3.00 mtr) for HATGOBINDAPUR water supply scheme under Burdwan-II development Block under Burdwan Sub-Division, under Burdwan Division, PHE Dte.[Gr.-A] ORD/000211/2021-2022 665/BSD 07/06/2021 45 KAJAL MUKHERJEE 2.76 2.71 98.19 0
3971 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) under the command area of Itla Piped Water Supply Scheme , SM/07549 Retrofitting Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of ITLA Piped Water Supply Scheme at Itla (Itla Adibasipara Habitation) & Sudipur (Sudipur Habitation) Village (Mouza), Jamalpur Block under Burdwan Division, PHE Dte. (Agreement No. 583/BWD OF 2020-2021.) AE(HQs) ORD/000275/2020-2021 545/BWD 22/01/2021 60 ANWESHA CONSTRUCTION 17.35 0.00 0 1
3972 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) under the command area of Itla Piped Water Supply Scheme , SM/07549 Retrofitting Interconnection between inlet & delivery pipe with main distribution pipeline within command area of ITLA Piped W/S. Scheme, Jamalpur Block under Burdwan Division, PHE. Dte. AE(HQs) J.E. 2 BURDWAN ORD/000825/2022-2023 213/AE/HQ 31/03/2023 30 BHARAT CONSTRUCTION 0.87 0.00 0 0
3973 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) under the command area of Itla Piped Water Supply Scheme , SM/07549 Retrofitting Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of ITLA Piped Water Supply Scheme at Bahadurpur (Bahadurpur Habitation) Village (Mouza), Jamalpur Block under Burdwan Division, PHE Dte. AE(HQs) ORD/000276/2020-2021 617/BWD 25/01/2021 60 A R TRADERS 19.81 0.00 0 1
3974 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) under the command area of Itla Piped Water Supply Scheme , SM/07549 Retrofitting Laying of uPVC pipe for providing FHTC at Itla Village within Itla Piped Water Supply Scheme, Jamalpur Block under Burdwan Division P.H.E Dte. [Group : E] AE(HQs) ORD/000489/2021-2022 66/AE/HQ 11/02/2022 30 MAUVE ENGINEERING AND SERVICES PVT LTD 4.73 4.73 100 100
3975 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) under the command area of Itla Piped Water Supply Scheme , SM/07549 Retrofitting Repairing and restoration of damaged and chokaged various dia UPVC pipeline and Construction of Valve chambers to control flow of water for providing FHTC in ITLA Piped W/S. Scheme at Jamalpur Dev Block under Burdwan Division ,P.H.E Dte._Gr-I AE(HQs) ORD/000667/2021-2022 147/AE/HQ 16/03/2022 20 BHARAT CONSTRUCTION 4.55 4.33 95.16 1
3976 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) under the command area of Itla Piped Water Supply Scheme , SM/07549 Retrofitting Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of ITLA Piped Water Supply Scheme at Itla (Itla Habitation) Village (Mouza), Jamalpur Block under Burdwan Division, PHE Dte. [Agreement No. 593/BWD OF 2020-2021] AE(HQs) ORD/000308/2020-2021 618/BWD 25/01/2021 60 JAYANTA CHAKRABORTY 18.36 11.65 63.45 1
3977 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) under the command area of Itla Piped Water Supply Scheme , SM/07549 Retrofitting Re-Laying of UPVC Pipeline (damaged by Local Irrigation Work) for providing FHTC at Bag Kalapahar Mouza (Habitation) under ITLA Piped Water Supply Scheme, Jamalpur Development Block under Burdwan Division, PHE Dte. AE(HQs) Junior Engineer, Burdwan Division ORD/000903/2023-2024 5513/BWD 14/12/2023 30 UTPAL NANDI 8.61 8.33 96.75 100
3978 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) under the command area of Itla Piped Water Supply Scheme , SM/07549 Retrofitting Interconnection between OHR & Delivery line at Head Works site under ITLA PWSS, Jamalpur Dev. Block under Burdwan Division, PHE Dte. AE(HQs) Junior Engineer, Burdwan Division ORD/000629/2024-2025 747/AE/HQ 13/09/2024 30 DEBJYOTI GOSWAMI 0.80 0.00 0 100
3979 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) under the command area of Itla Piped Water Supply Scheme , SM/07549 Retrofitting Construction of Boundary wall, Land Development for various PWSS, Block- Jamalpur, District:- Purba-Bardhaman within Burdwan Sub Division under Burdwan Division PHE Dte. AE(HQs),AE(HQs), Burdwan Division, PHE Dte. Junior Engineer, Burdwan Division ORD/001100/2024-2025 433/BWD 20/01/2025 120 RABINDRA NATH GORANG 132.64 0.00 0 40
3980 PURBA BARDHAMAN Burdwan Division DETAILED PROJECT REPORT FOR AUGMENTATION OF BORSHUL ZONE I PWSS BURDWAN II PURBA BARDHAMAN , SM/15309 Augmentation Sinking of 250 X 150mm dia Tube Well 150 mtr. Depth by D.R. Rig method using UPVC pipe (CD) and UPVC Deep Well Screen (RDS) at Head Works & 2nd Tube well Site for BORSHUL (Zone-I) Piped Water Supply Scheme, Block - Burdwan - II, Dist - Purba Bardhaman under Burdwan Division, PHE Dte. [For 02 Nos. Tube well]. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. Junior Engineer, Burdwan Sadar Sub-Division ORD/000193/2023-2024 2691/BWD 08/06/2023 45 J K CORPORATION 19.84 18.99 95.72 100
3981 PURBA BARDHAMAN Central Mechanical DETAILED PROJECT REPORT FOR AUGMENTATION OF BORSHUL ZONE I PWSS BURDWAN II PURBA BARDHAMAN , SM/15309 Augmentation New service connection charges for Borshul PWSS Z-I TW-2 BILL/01413/2023-2024 BP-2023-24-142 28/08/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.63 0.00 0 0
3982 PURBA BARDHAMAN Central Mechanical DETAILED PROJECT REPORT FOR AUGMENTATION OF BORSHUL ZONE I PWSS BURDWAN II PURBA BARDHAMAN , SM/15309 Augmentation New service connection charges for Borshul PWSS Z-I TW-1 BILL/01412/2023-2024 BP-2023-24-141 28/08/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 5.00 0.00 0 0
3983 PURBA BARDHAMAN Burdwan Division DETAILED PROJECT REPORT FOR AUGMENTATION OF BORSHUL ZONE I PWSS BURDWAN II PURBA BARDHAMAN , SM/15309 Augmentation Construction of Pump House cum chlorine room without sanitary and water supply arrangement at 2nd Tube Well Site to departmental drawing no-PHE/BD/P.H/DRG/02/DEC-17 (Size3.60mtrx3.00mtr room) for Barsul Zone-1 its Adjoining Mouza W/S Scheme, Block -Burdwan-II within Burdwan Sub-Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. Junior Engineer, Burdwan Sadar Sub-Division ORD/000575/2023-2024 2040/BSD 24/08/2023 45 DEBJYOTI GOSWAMI 3.19 2.61 81.82 100
3984 PURBA BARDHAMAN Burdwan Division DETAILED PROJECT REPORT FOR AUGMENTATION OF BORSHUL ZONE I PWSS BURDWAN II PURBA BARDHAMAN , SM/15309 Augmentation Conducting physical Household Survey at the IMIS reported village for HGJ certification and providing balance FHTC for Har Ghar Jal certification including conducting Gram Sabhas for different IMIS reported villages across the district under Burdwan Division, PHE Dte. AE(HQs),Assistant Engineer ,Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE.,Assistant Engineer, Durgapur Sub Division, P.H.E. Dte JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000428/2024-2025 3107/BWD 12/08/2024 323 TUBGRAM GRAMMYAK UNNAYAN SAMITY 309.60 0.00 0 85
3985 PURBA BARDHAMAN Burdwan Division DETAILED PROJECT REPORT FOR AUGMENTATION OF BORSHUL ZONE I PWSS BURDWAN II PURBA BARDHAMAN , SM/15309 Augmentation Construction of internal pathway , approch road and Ohr Plinth protection at head work site for Borshul Z-I PWSS under Bardhaman-II block within Burdwan Div.PHE Dte. Junior Engineer, Burdwan Sadar Sub-Division ORD/000655/2025-2026 1412/BSD 17/06/2025 30 RADHAKRISHNA ENTERPRISE 2.62 0.00 0 100
3986 PURBA BARDHAMAN Burdwan Division DETAILED PROJECT REPORT FOR AUGMENTATION OF BORSHUL ZONE I PWSS BURDWAN II PURBA BARDHAMAN , SM/15309 Augmentation Allied work for construction of pump house including plinth protection with surface drain at head work TW site for Borshul Z-I PWSS under Bardhaman-II block within Burdwan Div.PHE Dte. Junior Engineer, Burdwan Sadar Sub-Division ORD/000779/2025-2026 1470/BSD 23/06/2025 60 DAWN ASSOCIATES 2.57 0.00 0 0
3987 PURBA BARDHAMAN Burdwan Division DETAILED PROJECT REPORT FOR AUGMENTATION OF BORSHUL ZONE I PWSS BURDWAN II PURBA BARDHAMAN , SM/15309 Augmentation Augmentation of Borshul (Zone-I) Piped Water Supply Scheme (Mouzas:- Barshul, Tatkhanda & Dakshin Goplapur) with LDS, FHTC, Rising main, Construction of 250 cum capacity OHR with 20.0 mtr. Staging height inclusive of soil investigation under BARDHAMAN- II Block, District:- Purba-Burdwan. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. Junior Engineer, Burdwan Sadar Sub-Division ORD/000700/2022-2023 616/BWD 17/02/2023 683 ASHOK KUMAR GHOSH 331.77 251.14 75.7 51
3988 PURBA BARDHAMAN Central Mechanical AUGMENTATION OF SRIKHANDA PIPED WATER SUPPLY SCHEME , SM/15557 Augmentation Supply & Installation of Submersible Pumping Machinery , Voltage Stabilizer, Chlorination system and internal House wiring for Tube well no.- 1 at Augumentation of Srikhanda Water Supply Scheme under CMD, PHE Dte., Dist.- Purba-Bardhaman. Driller In-Charge Junior Engineer ORD/000087/2023-2024 2582/CMD 07/06/2023 580 AMUSAR IMPEX PVT. LTD. 11.25 0.00 0 95
3989 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF SRIKHANDA PIPED WATER SUPPLY SCHEME , SM/15557 Augmentation Balance work of OHR, construction Concrete Road, Functional Household Tap Connection, Road restoration etc. for Nanagar PWSS, Srikhanda PWSS, under KATWA -I Block under Katwa Sub-Divn under Burdwan Division, PHE Dte. District:- Purba-Bardhaman. Assistant Engineer ORD/000685/2024-2025 3655/BWD 21/10/2024 120 HAMID SK 121.69 0.00 0 0
3990 PURBA BARDHAMAN Central Mechanical AUGMENTATION OF SRIKHANDA PIPED WATER SUPPLY SCHEME , SM/15557 Augmentation Quotation for new service connection at Augmentation of Srikhanda PWSS, PH-1. BILL/00464/2024-2025 BP-2024-25-249 01/08/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.73 0.00 0 0
3991 PURBA BARDHAMAN Central Mechanical AUGMENTATION OF SRIKHANDA PIPED WATER SUPPLY SCHEME , SM/15557 Augmentation QUOTATION FOR NEW SERVICE CONNECTION AT AUGMENTATION OF SRIKHANDA PWSS TW 2 BILL/00365/2024-2025 BP-2024-25-188 08/07/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 4.98 0.00 0 0
3992 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF SRIKHANDA PIPED WATER SUPPLY SCHEME , SM/15557 Augmentation Augmentation of SRIKHANDA Piped Water Supply Scheme with sinking of Tube-well, LDS, Rising Main, FHTC, Construction of 450 cum capacity RCC OHR with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drain and internal pathway at different TW site under KATWA-II Block, District:- Purba-Bardhaman. Assistant Engineer JUNIOR ENGINEER KATWA SUB-DIVISION PHE DTE ORD/000489/2023-2024 3508/BWD 10/08/2023 875 GUPTA ENTERPRISE 656.48 252.17 38.41 18
3993 PURBA BARDHAMAN Central Mechanical AUGMENTATION OF SRIKHANDA PIPED WATER SUPPLY SCHEME , SM/15557 Augmentation Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.- 2 at Augumentation of Srikhanda Water Supply Scheme [ BLOCK- Katwa-I ]under CMD, PHE Dte., Dist.- Purba-Bardhaman. Driller In-Charge Junior Engineer ORD/001644/2023-2024 1626/CMD 15/03/2024 30 D.K. ELECTRIC 11.62 10.52 90.53 88
3994 PURBA BARDHAMAN Memari-II Burdwan Division MOSHRA PIPED WATER SUPPLY SCHEME , SM/14931 New Material Requisition To Resource Division RTOR000345/2023-2024 2197/BWD 12/05/2023 0 Resource Division 9.91 0.00 0 0
3995 PURBA BARDHAMAN Memari-II Burdwan Division MOSHRA PIPED WATER SUPPLY SCHEME , SM/14931 New Material Requisition To Resource Division RTOR000469/2023-2024 3993/BWD 08/09/2023 0 Resource Division 7.17 0.00 0 0
3996 PURBA BARDHAMAN Memari-II Burdwan Division MOSHRA PIPED WATER SUPPLY SCHEME , SM/14931 New Material Requisition To Resource Division RTOR000678/2023-2024 5053/BWD 23/11/2023 0 Resource Division 20.46 0.00 0 0
3997 PURBA BARDHAMAN Memari-II Burdwan Division MOSHRA PIPED WATER SUPPLY SCHEME , SM/14931 New Continuation Work Order supply of inspection Vehicle for inspection of different JJM related(schemes)works as and when required including supply of driver & fuel(minimum 8 hours duty per day) and all taxes etc. for Burdwan Sub-Division under Burdwan Division,PHE Dte consider 96.00 Km. run per day (Period from 01-11-2023 to 31-01-2024) ORD/000985/2023-2024 2561/BSD 30/10/2023 66 MD HASIN 0.85 0.00 0 0
3998 PURBA BARDHAMAN Memari-II Central Mechanical MOSHRA PIPED WATER SUPPLY SCHEME , SM/14931 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at NOAHATI & others water supply scheme under Memari-II Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. ASSISTANT ENGINEER Junior Engineer ORD/000102/2024-2025 2395/CMD 02/08/2024 90 S.G. TECHNICAL SERVICES 36.99 0.00 0 0
3999 PURBA BARDHAMAN Memari-II Central Mechanical MOSHRA PIPED WATER SUPPLY SCHEME , SM/14931 New Electric quotation for New Service Connection at Moshra W/S Scehem PH-I. BILL/01782/2023-2024 BP-2023-24-289 26/12/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 5.54 0.00 0 0
4000 PURBA BARDHAMAN Memari-II Central Mechanical MOSHRA PIPED WATER SUPPLY SCHEME , SM/14931 New Quotation for new service connection for Mashra PWSS TW-2 BILL/00297/2024-2025 BP-2024-25-147 19/06/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 4.84 0.00 0 0
4001 PURBA BARDHAMAN Memari-II Burdwan Division MOSHRA PIPED WATER SUPPLY SCHEME , SM/14931 New MOSHRA Piped Water Supply Scheme with sinking of Tube-well, LDS, Rising Main, FHTC, Construction of 150 cum capacity RCC OHR with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drain and internal pathway at different TW site under Memari-II Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000387/2023-2024 3196/BWD 24/07/2023 768 M/S LOKE NIRMAN 285.22 130.54 45.77 85
4002 PURBA BARDHAMAN Memari-II Central Mechanical MOSHRA PIPED WATER SUPPLY SCHEME , SM/14931 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at Moshra Water Supply Scheme [ Block- Memari-2 ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER Junior Engineer ORD/000714/2023-2024 4025/CMD 29/08/2023 642 MAA KALI ENTERPRISE 29.37 11.67 39.73 100
4003 PURBA BARDHAMAN Memari-II Burdwan Division MOSHRA PIPED WATER SUPPLY SCHEME , SM/14931 New Continuation Work Order for supply of inspection Vehicle No. WB42Y- 7403 for inspection of different JJM related (schemes) works as and when required including supply of driver & fuel(minimum 8 hours duty per day) and all taxes etc. for Burdwan Sub Division under Burdwan Division, PHE Dte consider 96.00 Km. run per day (Period from 01-05-2025 to 31-07-2025) JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000181/2025-2026 960/BSD 30/04/2025 66 PARVIN BEGAM 0.85 0.00 0 100
4004 PURBA BARDHAMAN Mangolkote Burdwan Division MAHARUTBA PIPED WATER SUPPLY SCHEME , SM/14970 New Material Requisition To Resource Division RTOR000115/2023-2024 1965/BWD 26/04/2023 0 Resource Division 2.48 0.00 0 0
4005 PURBA BARDHAMAN Mangolkote Burdwan Division MAHARUTBA PIPED WATER SUPPLY SCHEME , SM/14970 New Material Requisition To Resource Division RTOR000336/2023-2024 2197/BWD 12/05/2023 0 Resource Division 1.47 0.00 0 0
4006 PURBA BARDHAMAN Mangolkote Central Drilling MAHARUTBA PIPED WATER SUPPLY SCHEME , SM/14970 New Providing drilling crew and other allied works for construction of Tube Well (250mm X150mm X 240 Mtrs. Depth) by utilising Departmental Machineries for MAHARUTBA W/S Scheme (T/W-I), Mongalkote Block under Purba Bardhaman District, Central Drilling Division, P.H.E. Dte. Assistant Engineer Junior Engineer ORD/000157/2023-2024 1819/CDD 07/12/2023 30 M/S PRACHI ENGINEERING 13.67 13.12 95.98 100
4007 PURBA BARDHAMAN Mangolkote Central Drilling MAHARUTBA PIPED WATER SUPPLY SCHEME , SM/14970 New Providing drilling crew and other allied works for construction of Tube Well (250mm X150mm X 240 Mtrs. Depth) by utilizing Departmental Machineries for MAHARUTBA W/S Scheme (T/W-II) Block- Mangolkote under Purba Bardhman District, Central Drilling Division, P.H.E. Dte. Assistant Engineer Junior Engineer ORD/000158/2023-2024 1338/CDD 13/09/2023 30 C.M. ENTERPRISE 11.46 4.59 40.05 100
4008 PURBA BARDHAMAN Mangolkote Burdwan Division MAHARUTBA PIPED WATER SUPPLY SCHEME , SM/14970 New Material Requisition To Resource Division RTOR000815/2023-2024 296/BWD 24/01/2024 0 Resource Division 20.47 0.00 0 0
4009 PURBA BARDHAMAN Mangolkote Central Mechanical MAHARUTBA PIPED WATER SUPPLY SCHEME , SM/14970 New NEW SERVICE CONNECTION FOR MAHARTUBA PWSS. BILL/02860/2023-2024 BP-2023-24-610 06/03/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 5.94 0.00 0 0
4010 PURBA BARDHAMAN Mangolkote Central Mechanical MAHARUTBA PIPED WATER SUPPLY SCHEME , SM/14970 New Quotation for new service connection at Mahartuba PWSS PH-1 BILL/00385/2024-2025 BP-2024-25-206 18/07/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 7.00 0.00 0 0
4011 PURBA BARDHAMAN Mangolkote Burdwan Division MAHARUTBA PIPED WATER SUPPLY SCHEME , SM/14970 New Different works related (sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of different capacity RCC OHRs each with 20.0mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site) to BHATPARA & MAHARUTBA Piped Water Supply Scheme under Mangolkote Block, District:-Purba-Bardhaman [NEW SCHEME] Assistant Engineer J.E. katwa,Junior Engineer ORD/000429/2023-2024 3328/BWD 02/08/2023 791 KAMIRUL SK & CO. 815.64 266.02 32.61 10
4012 PURBA BARDHAMAN Mangolkote Central Mechanical MAHARUTBA PIPED WATER SUPPLY SCHEME , SM/14970 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at Maharutba Water Supply Scheme [ Block- MONGOLKOTE] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER,Driller In-Charge Junior Engineer ORD/000775/2023-2024 4069/CMD 29/08/2023 30 GLACIER ENGINEERING CO 26.98 0.00 0 44
4013 PURBA BARDHAMAN Mangolkote Central Mechanical MAHARUTBA PIPED WATER SUPPLY SCHEME , SM/14970 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Lakshimpur & others water supply scheme under Mangalkote Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman Driller In-Charge Junior Engineer ORD/000097/2024-2025 2406/CMD 02/08/2024 290 CHOUDHURY ENTERPRISE 57.65 0.00 0 10
4014 PURBA BARDHAMAN Mangolkote Burdwan Division MAHARUTBA PIPED WATER SUPPLY SCHEME , SM/14970 New Balance work of MAHARTUTBA Piped Water Supply Scheme with sinking of Tube-well, LDS, FHTC & construction of switch rooms & boundary walls with gates and land development, drain and internal pathway at different TW site under Mongalkote Block, District:- Purba-Bardhaman Assistant Engineer JUNIOR ENGINEER R.W.S. BURDWAN SUB-DIVISION PHE DTE ORD/001212/2024-2025 722/BWD 24/02/2025 120 KAMIRUL SK & CO. 147.19 0.00 0 0
4015 PURBA BARDHAMAN Mangolkote Burdwan Division BHATPARA PIPE WATER SUPPLY SCHEME , SM/14975 New Material Requisition To Resource Division RTOR000460/2023-2024 3984/BWD 08/09/2023 0 Resource Division 1.21 0.00 0 0
4016 PURBA BARDHAMAN Mangolkote Burdwan Division BHATPARA PIPE WATER SUPPLY SCHEME , SM/14975 New Material Requisition To Resource Division RTOR000253/2023-2024 2197/BWD 12/05/2023 0 Resource Division 9.75 0.00 0 0
4017 PURBA BARDHAMAN Mangolkote Central Mechanical BHATPARA PIPE WATER SUPPLY SCHEME , SM/14975 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Jabagram & others water supply scheme under Mangalkote Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. Driller In-Charge Junior Engineer ORD/000118/2024-2025 2590/CMD 27/08/2024 90 M/S SAJAHAN CHOWDHURY 62.06 0.00 0 0
4018 PURBA BARDHAMAN Mangolkote Central Drilling BHATPARA PIPE WATER SUPPLY SCHEME , SM/14975 New Providing drilling crew and other allied works for construction of Tube Well (250mm X150mm X 240 Mtrs. Depth) by utilizing Departmental Machineries for Bhatpara W/S Scheme (T/W-I & II), Block- Mangolkote under Purba Bardhman District, Central Drilling Division, P.H.E. Dte. Assistant Engineer Junior Engineer ORD/000156/2023-2024 1820/CDD 07/12/2023 268 UTTAM KUMAR CHATTERJEE 23.35 22.50 96.36 100
4019 PURBA BARDHAMAN Mangolkote Burdwan Division BHATPARA PIPE WATER SUPPLY SCHEME , SM/14975 New Material Requisition To Resource Division RTOR000798/2023-2024 311/BWD 24/01/2024 0 Resource Division 20.47 0.00 0 0
4020 PURBA BARDHAMAN Mangolkote Central Mechanical BHATPARA PIPE WATER SUPPLY SCHEME , SM/14975 New Quotation for new service connection at Bhatpara PWSS PH-1. BILL/00349/2024-2025 BP-2024-25-171 01/07/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.58 0.00 0 0
4021 PURBA BARDHAMAN Mangolkote Central Mechanical BHATPARA PIPE WATER SUPPLY SCHEME , SM/14975 New Quotation for new service connection at Bhatpara PWSS PH-2. BILL/00348/2024-2025 BP-2024-25-170 01/07/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.38 0.00 0 0
4022 PURBA BARDHAMAN Mangolkote Burdwan Division BHATPARA PIPE WATER SUPPLY SCHEME , SM/14975 New Different works related (sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of different capacity RCC OHRs each with 20.0mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site) to BHATPARA & MAHARUTBA Piped Water Supply Scheme under Mangolkote Block, District:-Purba-Bardhaman [NEW SCHEME] Assistant Engineer J.E. katwa,Junior Engineer ORD/000429/2023-2024 3328/BWD 02/08/2023 791 KAMIRUL SK & CO. 815.64 375.49 46.04 10
4023 PURBA BARDHAMAN Mangolkote Burdwan Division GOHAGRAM PIPED WATER SUPPLY SCHEME , SM/14910 New Material Requisition To Resource Division RTOR000058/2022-2023 1244/BWD 17/03/2023 0 Resource Division 7.44 0.00 0 0
4024 PURBA BARDHAMAN Mangolkote Burdwan Division GOHAGRAM PIPED WATER SUPPLY SCHEME , SM/14910 New Material Requisition To Resource Division RTOR000110/2023-2024 1965/BWD 26/04/2023 0 Resource Division 2.89 0.00 0 0
4025 PURBA BARDHAMAN Mangolkote Central Mechanical GOHAGRAM PIPED WATER SUPPLY SCHEME , SM/14910 New New service connection charges of Gohagram W/S Scheme TW-2 BILL/00690/2023-2024 BP-2023-24-32 26/06/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 4.55 0.00 0 0
4026 PURBA BARDHAMAN Mangolkote Central Mechanical GOHAGRAM PIPED WATER SUPPLY SCHEME , SM/14910 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Jabagram & others water supply scheme under Mangalkote Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. Driller In-Charge Junior Engineer ORD/000118/2024-2025 2590/CMD 27/08/2024 90 M/S SAJAHAN CHOWDHURY 62.06 0.00 0 0
4027 PURBA BARDHAMAN Mangolkote Burdwan Division GOHAGRAM PIPED WATER SUPPLY SCHEME , SM/14910 New Material Requisition To Resource Division RTOR000810/2023-2024 300/BWD 24/01/2024 0 Resource Division 20.47 0.00 0 0
4028 PURBA BARDHAMAN Mangolkote Central Mechanical GOHAGRAM PIPED WATER SUPPLY SCHEME , SM/14910 New NEW SERVICE CONNECTION FOR GOHAGRAM PWSS TW 1. BILL/02489/2023-2024 BP-2023-24-539 15/02/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 4.94 0.00 0 0
4029 PURBA BARDHAMAN Mangolkote Burdwan Division GOHAGRAM PIPED WATER SUPPLY SCHEME , SM/14910 New Different works related (sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of different capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site) to GOHAGRAM, KHERUA & JABAGRAM Piped Water Supply Scheme under Mangalkote Block, District:- Purba Bardhaman [NEW SCHEME] Assistant Engineer JUNIOR ENGINEER KATWA SUB-DIVISION PHE DTE,JUNIOR ENGINEER R.W.S. BURDWAN SUB-DIVISION PHE DTE ORD/000697/2022-2023 582/BWD 17/02/2023 1049 PUSPA ENTERPRISE 1,185.88 197.48 16.65 75
4030 PURBA BARDHAMAN Mangolkote Central Mechanical GOHAGRAM PIPED WATER SUPPLY SCHEME , SM/14910 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at GOHAGRAM Water Supply Scheme [ Block- MANGALKOTE] under CMD, PHE Dte., Dist.- Purba-Bardhaman. Driller In-Charge Junior Engineer ORD/000123/2023-2024 2640/CMD 14/06/2023 740 CHOUDHURY ENTERPRISE 27.48 0.00 0 82
4031 PURBA BARDHAMAN Mangolkote Burdwan Division GOHAGRAM PIPED WATER SUPPLY SCHEME , SM/14910 New Balance works for different type of works in connection with Jaggeswardihi PWSS, Deulia PWSS, Kunda PWSS and Gohagram PWSS Under Mongalkote Block within Katwa Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer JUNIOR ENGINEER KATWA SUB-DIVISION PHE DTE ORD/001186/2024-2025 593/BWD 07/02/2025 120 MD HASIN 203.38 0.00 0 20
4032 PURBA BARDHAMAN Mangolkote Burdwan Division GOHAGRAM PIPED WATER SUPPLY SCHEME , SM/14910 New Different types of works involve in connection with implementation of Gohgram, Jabagram, Kherua, Lakshmipur & Simulia Piped Water Supply Scheme under Mongolkote Block within Katwa Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer ORD/001301/2024-2025 936/BWD 11/03/2025 180 M/S GHOSH CONSTRUCTION 360.68 0.00 0 0
4033 PURBA BARDHAMAN Mangolkote Burdwan Division NIGAN PIPE WATER SUPPLY SCHEME , SM/14912 New Material Requisition To Resource Division RTOR000356/2023-2024 2197/BWD 12/05/2023 0 Resource Division 10.74 0.00 0 0
4034 PURBA BARDHAMAN Mangolkote Burdwan Division NIGAN PIPE WATER SUPPLY SCHEME , SM/14912 New Material Requisition To Resource Division RTOR000459/2023-2024 3983/BWD 08/09/2023 0 Resource Division 3.91 0.00 0 0
4035 PURBA BARDHAMAN Mangolkote Burdwan Division NIGAN PIPE WATER SUPPLY SCHEME , SM/14912 New Material Requisition To Resource Division RTOR000806/2023-2024 303/BWD 24/01/2024 0 Resource Division 20.47 0.00 0 0
4036 PURBA BARDHAMAN Mangolkote Central Mechanical NIGAN PIPE WATER SUPPLY SCHEME , SM/14912 New Quotation for new service connection at Nigan PWSS TW-1 BILL/01084/2024-2025 BP-2024-25-394 22/11/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.95 0.00 0 0
4037 PURBA BARDHAMAN Mangolkote Central Mechanical NIGAN PIPE WATER SUPPLY SCHEME , SM/14912 New Quotation for new service connection at Nigan PWSS TW-2 BILL/01085/2024-2025 BP-2024-25-395 22/11/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 10.15 0.00 0 0
4038 PURBA BARDHAMAN Mangolkote Burdwan Division NIGAN PIPE WATER SUPPLY SCHEME , SM/14912 New NIGAN Piped Water Supply Scheme with sinking of Tube-well, LDS, Construction of 250 cum RCC OHR with 20 mtr. staging height including soil testing, Rising Main, FHTC & construction of switch rooms & boundary walls with gates and land development, drain and internal pathway at different TW site under Mangolkote Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer JUNIOR ENGINEER KATWA SUB-DIVISION PHE DTE ORD/000142/2023-2024 2386/BWD 23/05/2023 365 AKASH CONSTRUCTION 400.98 27.53 6.87 15
4039 PURBA BARDHAMAN Mangolkote Central Mechanical NIGAN PIPE WATER SUPPLY SCHEME , SM/14912 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at Nigan Water Supply Scheme [ Block- MONGOLKOTE ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. Driller In-Charge Junior Engineer ORD/000770/2023-2024 4068/CMD 29/08/2023 710 AHALYA ENGINEERING WORKS 27.78 0.00 0 44
4040 PURBA BARDHAMAN Mangolkote Central Mechanical NIGAN PIPE WATER SUPPLY SCHEME , SM/14912 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Lakshimpur & others water supply scheme under Mangalkote Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman Driller In-Charge Junior Engineer ORD/000097/2024-2025 2406/CMD 02/08/2024 290 CHOUDHURY ENTERPRISE 57.65 0.00 0 10
4041 PURBA BARDHAMAN Mangolkote Burdwan Division NIGAN PIPE WATER SUPPLY SCHEME , SM/14912 New Continuation work order for Supply of 1 (one) No. Diesel driven Ambassador Car (Luxury Taxi) / Motor Cab on hire basis for the Office of the Assistant Engineer, under Katwa Sub-Division within Burdwan Division, P.H.E. Dte. [Period from 01.07.2025 to 31.12.2025]. Assistant Engineer JUNIOR ENGINEER KATWA SUB-DIVISION PHE DTE ORD/000319/2025-2026 1595/KTS 30/06/2025 184 KRISHNA MONDAL 2.40 0.00 0 33
4042 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GANGAGTIKURI PIPED WATER SUPPLY SCHEME , SM/15159 Augmentation Detail route survey, design of distribution network and preparation of estimate, drawing & DPR for providing FHTC in the scheme GANGATIKURI PWSS (Sl No-04) Assistant Engineer JUNIOR ENGINEER KATWA SUB-DIVISION PHE DTE ORD/000072/2023-2024 396/KTS 13/04/2023 30 SIRCON ENGINEERING SERVICES 2.49 2.49 100 100
4043 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GANGAGTIKURI PIPED WATER SUPPLY SCHEME , SM/15159 Augmentation Continuation Work Order for Supply of 1 (one) No. Inspection Vehicle for different JJM Related Works as and when required including supply of driver and fuels (Minimum 8 Hours of duty) under Katwa Sub-Division within Burdwan Division, P.H.E. Dte. Consider 96.00 Km run per Day Assistant Engineer JUNIOR ENGINEER KATWA SUB-DIVISION PHE DTE ORD/000683/2024-2025 1009/KTS 19/07/2024 60 AJIT SAMANTA 0.77 0.15 19.48 100
4044 PURBA BARDHAMAN Central Mechanical AUGMENTATION OF GANGAGTIKURI PIPED WATER SUPPLY SCHEME , SM/15159 Augmentation Yard lighting arrangement & allied works at Gangatikuri water supply scheme under Ketugram-II Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. Driller In-Charge JUNIOR ENGINEER ORD/000408/2024-2025 2788/CMD 01/10/2024 60 DILIP MAHATO 15.98 0.00 0 0
4045 PURBA BARDHAMAN Central Mechanical AUGMENTATION OF GANGAGTIKURI PIPED WATER SUPPLY SCHEME , SM/15159 Augmentation Quotation for new service connection at Augmentation of Gangatikuri PWSS TW-1 BILL/01093/2024-2025 BP-2024-25-402 22/11/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 4.88 0.00 0 0
4046 PURBA BARDHAMAN Central Mechanical AUGMENTATION OF GANGAGTIKURI PIPED WATER SUPPLY SCHEME , SM/15159 Augmentation Supply & Installation of Submersible Pumping Machinery , Voltage Stabilizer, Chlorination system and internal House wiring for Tube well no.- 1&2 at Augumentation of Gangatikuri Water Supply Scheme under CMD, PHE Dte., Dist.- Purba-Bardhaman. Driller In-Charge Junior Engineer ORD/000093/2023-2024 2584/CMD 07/06/2023 730 M/S, S.S. ENTERPRISE. 22.60 0.00 0 44
4047 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GANGAGTIKURI PIPED WATER SUPPLY SCHEME , SM/15159 Augmentation Augmentation of GANGATIKURI Piped Water Supply Scheme with sinking of Tube-well, LDS, Rising Main, FHTC, Construction of 150 cum capacity RCC OHR with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drain and internal pathway at different TW site under KETUGRAM-II Block, District:- Purba-Bardhaman. Assistant Engineer JUNIOR ENGINEER KATWA SUB-DIVISION PHE DTE ORD/000897/2023-2024 5375/BWD 07/12/2023 602 S.S. ENTERPRISE 194.38 93.32 48.01 56
4048 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GANGAGTIKURI PIPED WATER SUPPLY SCHEME , SM/15159 Augmentation Protection work for construction of concrete road along with other allied work in connection with Gangatikuri PWSs (SM/15159) under Ketugram II Block under Katwa Sub Division within Burdwan Division, PHE. Dte. Assistant Engineer JUNIOR ENGINEER KATWA SUB-DIVISION PHE DTE ORD/001059/2024-2025 258/BWD 14/01/2025 352 S.S. ENTERPRISE 34.25 0.00 0 0
4049 PURBA BARDHAMAN Mangolkote Burdwan Division SITAHATI PIPE WATER SUPPLY SCHEME , SM/15161 New Material Requisition To Resource Division RTOR000041/2023-2024 1962/BWD 25/04/2023 0 Resource Division 1.10 0.00 0 0
4050 PURBA BARDHAMAN Mangolkote Burdwan Division SITAHATI PIPE WATER SUPPLY SCHEME , SM/15161 New Material Requisition To Resource Division RTOR000324/2023-2024 2197/BWD 12/05/2023 0 Resource Division 17.24 0.00 0 0
4051 PURBA BARDHAMAN Mangolkote Burdwan Division SITAHATI PIPE WATER SUPPLY SCHEME , SM/15161 New Material Requisition To Resource Division RTOR000734/2023-2024 5233/BWD 30/11/2023 0 Resource Division 20.37 0.00 0 0
4052 PURBA BARDHAMAN Mangolkote Central Mechanical SITAHATI PIPE WATER SUPPLY SCHEME , SM/15161 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at SITAHATI Water Supply Scheme [ Block- MANGOLKOTE] under CMD, PHE Dte., Dist.- Purba-Bardhaman. Driller In-Charge Junior Engineer ORD/000875/2023-2024 4138/CMD 29/08/2023 30 CHOUDHURY ENTERPRISE 27.70 22.72 82.02 46
4053 PURBA BARDHAMAN Mangolkote Burdwan Division SITAHATI PIPE WATER SUPPLY SCHEME , SM/15161 New Supply, delivery, installation & hand hold demonstration of different equipments / machineries to test HDPE pipes as per IS: 4984-2016 at the pipe testing laboratory at Nababhat under Burdwan Division, PHE. Dte._2ND CALL AE(HQs) J.E. 1 BURDWAN ORD/001212/2023-2024 907/BWD 04/03/2024 30 MANASH GHOSH 23.87 4.76 19.94 100
4054 PURBA BARDHAMAN Mangolkote Burdwan Division SITAHATI PIPE WATER SUPPLY SCHEME , SM/15161 New Material Requisition To Resource Division RTOR000009/2024-2025 4118/BWD 25/11/2024 0 Resource Division 18.62 0.00 0 0
4055 PURBA BARDHAMAN Mangolkote Central Mechanical SITAHATI PIPE WATER SUPPLY SCHEME , SM/15161 New NEW SERVICE CONNECTION FOR SITAHATI PWSS. BILL/02863/2023-2024 BP-2023-24-611 06/03/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 6.68 0.00 0 0
4056 PURBA BARDHAMAN Mangolkote Central Mechanical SITAHATI PIPE WATER SUPPLY SCHEME , SM/15161 New NEW SERVICE CONNECTION FOR SITAHATI PWSS. BILL/02861/2023-2024 BP-2023-24-612 06/03/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 8.43 0.00 0 0
4057 PURBA BARDHAMAN Mangolkote Central Mechanical SITAHATI PIPE WATER SUPPLY SCHEME , SM/15161 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Lakshimpur & others water supply scheme under Mangalkote Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman Driller In-Charge Junior Engineer ORD/000097/2024-2025 2406/CMD 02/08/2024 290 CHOUDHURY ENTERPRISE 57.65 0.00 0 10
4058 PURBA BARDHAMAN Mangolkote Burdwan Division SITAHATI PIPE WATER SUPPLY SCHEME , SM/15161 New Different works related (sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of different capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site) to PALISGRAM, PURBA NAYAPARA & SITAHATI Piped Water Supply Scheme under MONGALKOTE Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer JUNIOR ENGINEER KATWA SUB-DIVISION PHE DTE,JUNIOR ENGINEER R.W.S. BURDWAN SUB-DIVISION PHE DTE ORD/000695/2023-2024 4364/BWD 04/10/2023 910 M/S S. CHOUDHURY 1,505.07 243.95 16.21 77
4059 PURBA BARDHAMAN Mangolkote Burdwan Division SITAHATI PIPE WATER SUPPLY SCHEME , SM/15161 New Different types of works involve in connection with implementation of Aug. Mongalkote, Palishgram, Purba Nowapara, Sitahati, Singhi, Mejhiary & Karui Piped Water Supply Scheme within Katwa Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer ORD/001191/2024-2025 873/BWD 06/03/2025 180 M/S S. CHOUDHURY 588.22 0.00 0 0
4060 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED NABABHAT PWSS (PART B) , SM/15166 Augmentation Construction of Pump House cum chlorine room without sanitary and water supply arrangement at Tube Well Site to departmental drawing no-PHE/BD/P.H/DRG/02/DEC-17(Size 3.60 mtr x 3.00 mtr room) for NABABHAT its Adjoining Mouza W/S Scheme, Block -Bardhaman-I within Burdwan Sub-Division, PHE Dte. (Mouza- KRISHNAPUR) Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000830/2022-2023 499/BSD 21/03/2023 45 BHASKAR NANDY 3.16 2.73 86.39 100
4061 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED NABABHAT PWSS (PART B) , SM/15166 Augmentation Balance work for Augmentation of Nababhat PWSS in connection with renovation and modification of administrative office complex building under Burdwan Division PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000450/2023-2024 3400/BWD 03/08/2023 30 SANDIPAN SENGUPTA 7.78 7.76 99.74 100
4062 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED NABABHAT PWSS (PART B) , SM/15166 Augmentation Balance work for Augmentation of Nababhat PWSS in connection with renovation and modification of administrative office complex building under Burdwan Division PHE Dte. (Part - II). Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. J.E. 1 BURDWAN ORD/000849/2023-2024 5156/BWD 24/11/2023 30 SANDIPAN SENGUPTA 9.63 9.56 99.27 100
4063 PURBA BARDHAMAN Central Mechanical AUGMENTATION OF GROUND WATER BASED NABABHAT PWSS (PART B) , SM/15166 Augmentation New service connection charges of Aug. Nababhat W/S Scheme TW-3 BILL/00686/2023-2024 BP-2023-24-31 23/06/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 2.58 0.00 0 0
4064 PURBA BARDHAMAN Central Mechanical AUGMENTATION OF GROUND WATER BASED NABABHAT PWSS (PART B) , SM/15166 Augmentation Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination system and internal House wiring for Tube well no.- 1 & 2 at Augmentation of NABABHAT( Part-B)[BURDWAN-I] Water Supply Scheme under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER Junior Engineer ORD/000571/2023-2024 3899/CMD 18/08/2023 30 CINZANO 22.41 11.18 49.89 50
4065 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED NABABHAT PWSS (PART B) , SM/15166 Augmentation Allied work for Augmentation of NABABHAT PWSS under Burdwan-I Block of Burdwan Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE,Junior Engineer, Burdwan Sadar Sub-Division ORD/000432/2023-2024 3360/BWD 02/08/2023 60 M/S ANAND CONSTRUCTION 40.09 40.07 99.95 100
4066 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED NABABHAT PWSS (PART B) , SM/15166 Augmentation Laying of inter connection between 3rd tube well site (Mouza-Krishnapur) and distribution system for Nababhat PWSS within Bardhaman-I Block , under Burdwan Division, PHE Dte ORD/000942/2023-2024 2951/BSD 19/12/2023 45 I.S. ENTERPRISE 2.91 2.90 99.66 100
4067 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED NABABHAT PWSS (PART B) , SM/15166 Augmentation Providing laying distrfrrrrribution pipe line at Amtala-Sukantapally due to construction of Road by gp for Nababhat PWSS under Burdwan-I Block of Burdwan Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. Junior Engineer, Burdwan Sadar Sub-Division ORD/000143/2024-2025 1031/BSD 10/06/2024 30 SANDIPAN SENGUPTA 0.96 0.92 95.83 100
4068 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED NABABHAT PWSS (PART B) , SM/15166 Augmentation Providing laying distribution pipe line due to Constructioon of road by GP for NABABHAT PWSS under Burdwan-I Block of within Burdwan Sub Division under Burdwan Division PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. Junior Engineer, Burdwan Sadar Sub-Division ORD/001190/2023-2024 536/BSD 14/03/2024 30 NABAKUMAR DAS 0.86 0.85 98.84 100
4069 PURBA BARDHAMAN Central Mechanical AUGMENTATION OF GROUND WATER BASED NABABHAT PWSS (PART B) , SM/15166 Augmentation Supply & Installation of submersible pumping machinery, different electro-mechanical works for Nababhat w/s scheme, T.W. No.-I (Replacement tubewell) and Power Backup arrangement at the office of the Burdwan Division & Durgapur w/s Division including RWS, Purba Bardhaman under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER Junior Engineer ORD/000324/2024-2025 2695/CMD 11/09/2024 263 CHOUDHURY ENTERPRISE 24.83 0.00 0 100
4070 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED NABABHAT PWSS (PART B) , SM/15166 Augmentation Balance Work for extension of pipe lines to provide FHTC With Sinking of Tub well , Construction of pump house with Boundary wall & other related work for TALIT-SIMDAL (SM/18112), NABABHAT (SM-15166) and DEWANDIGHI-MIRJAPUR (SM/09494) PWSS under Burdwan Sub-Div., Block -Bwn-1, under Burdwan Division PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/001248/2024-2025 793/BWD 03/03/2025 120 M/S S.S. ENTERPRISE 227.66 0.00 0 0
4071 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED NABABHAT PWSS (PART B) , SM/15166 Augmentation Balance work for Augmentation of Nababhat PWSS in connection with upgradation of Approach Road, Land Development, etc for Head Works Site of Nababhat PWSS under Burdwan Division PHE Dte. AE(HQs) J.E. 1 BURDWAN ORD/001208/2024-2025 661/BWD 18/02/2025 30 M/S S. CHOUDHURY 19.92 0.00 0 100
4072 PURBA BARDHAMAN Burdwan Division AUGUMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR CHANDUTIA , SM/15205 Augmentation Preparation and Submission of DPR for Augmentation of Chandutia PWSS under Burdwan-I Development Block under Burdwan Division, P.H.E Dte.[2nd Call] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000348/2023-2024 1475/BSD 12/07/2023 15 MEASURE LAND 0.78 0.77 98.72 100
4073 PURBA BARDHAMAN Burdwan Division AUGUMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR CHANDUTIA , SM/15205 Augmentation Conducting physical Household Survey at the IMIS reported village for HGJ certification and providing balance FHTC for Har Ghar Jal certification including conducting Gram Sabhas for different IMIS reported villages across the district under Burdwan Division, PHE Dte. AE(HQs),Assistant Engineer ,Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE.,Assistant Engineer, Durgapur Sub Division, P.H.E. Dte JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000428/2024-2025 3107/BWD 12/08/2024 323 TUBGRAM GRAMMYAK UNNAYAN SAMITY 309.60 0.00 0 85
4074 PURBA BARDHAMAN Burdwan Division AUGUMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR CHANDUTIA , SM/15205 Augmentation Designing,making and erection of Sign Board for SWAJAL GRAM in Chandutia village of Burdwan-I Block under Chandutia Piped Water Supply Scheme within Burdwan Sub-Division under Burdwan Division,PHE Dte (5 Nos. Board) Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE,Junior Engineer, Burdwan Sadar Sub-Division ORD/000449/2025-2026 2312/BSD 19/08/2025 10 MANABSEBA PROKALPA & CONSTRUCTIONS 0.72 0.00 0 100
4075 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF SUDPUR PIPED WATER SUPPLY SCHEME , SM/15573 Augmentation Balance work of OHR at Head Work site, construction of HUME Pipe culvert , Road restoration work and boundary wall at 2nd TW site with Gate, land development at Head work site and 2nd TW site under KAITHAN, SUDPUR & PANUHAT Piped Water Supply Scheme under KATWA -I Block, under Katwa Sub-Division within Burdwan Division, PHE Dte. Assistant Engineer JUNIOR ENGINEER KATWA SUB-DIVISION PHE DTE ORD/000486/2024-2025 3141/BWD 20/08/2024 120 VISHAL CONSTRUCTION CO. 126.29 31.92 25.28 50
4076 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF SUDPUR PIPED WATER SUPPLY SCHEME , SM/15573 Augmentation Augmentation of SUDPUR Piped Water Supply Scheme with sinking of Tube-well, LDS, Rising Main, FHTC, Construction of 450 cum capacity RCC OHR with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drain and internal pathway at different TW site under KATWA-II Block, District:- Purba-Bardhaman._2ND CALL Assistant Engineer JE RWS ORD/000658/2023-2024 4122/BWD 14/09/2023 840 INDIAN ENGINEERS CO.-OPERATIVE SOCIETY LTD. 442.27 42.09 9.52 63
4077 PURBA BARDHAMAN Raina-I Burdwan Division SHUKUR PIPED WATER SUPPLY SCHEME , SM/16255 New Material Requisition To Resource Division RTOR000314/2023-2024 2197/BWD 12/05/2023 0 Resource Division 5.01 0.00 0 0
4078 PURBA BARDHAMAN Raina-I Burdwan Division SHUKUR PIPED WATER SUPPLY SCHEME , SM/16255 New Material Requisition To Resource Division RTOR000480/2023-2024 4004/BWD 08/09/2023 0 Resource Division 7.71 0.00 0 0
4079 PURBA BARDHAMAN Raina-I Burdwan Division SHUKUR PIPED WATER SUPPLY SCHEME , SM/16255 New Material Requisition To Resource Division RTOR000693/2023-2024 5072/BWD 23/11/2023 0 Resource Division 20.46 0.00 0 0
4080 PURBA BARDHAMAN Raina-I Central Mechanical SHUKUR PIPED WATER SUPPLY SCHEME , SM/16255 New New service connection charges for Shukur PWSS TW-2 BILL/01762/2023-2024 BP-2023-24-272 15/12/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 4.71 0.00 0 0
4081 PURBA BARDHAMAN Raina-I Central Mechanical SHUKUR PIPED WATER SUPPLY SCHEME , SM/16255 New Continuation order-Hiring of Inspection Vehicle (Diesel/CNG/LPG Driven ) for supervision of site for the office of the Assistant Engineer,under CMD,PHE,Dte. [W.e.f-01/10/2024 to 30/11/2024) [UNDER JJM WORKS] ASSISTANT ENGINEER Junior Engineer ORD/000425/2024-2025 1248/CMSD 30/09/2024 61 PRODYUT GHOSH 0.80 0.77 96.25 0
4082 PURBA BARDHAMAN Raina-I Central Mechanical SHUKUR PIPED WATER SUPPLY SCHEME , SM/16255 New New Service connection for Sukur W/S Scheme PH No.-I BILL/01793/2023-2024 BP-2023-24-318 30/12/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 6.06 0.00 0 0
4083 PURBA BARDHAMAN Raina-I Burdwan Division SHUKUR PIPED WATER SUPPLY SCHEME , SM/16255 New Different works related (sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of different capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site) to BAJITPUR, SHUKUR & HARISHNAPUR Piped Water Supply Scheme under RAINA-I Block, District:- Purba Bardhaman [NEW SCHEME] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000388/2023-2024 3197/BWD 24/07/2023 365 MRITYUNJOY MUKHERJEE & CO. 1,242.03 105.22 8.47 55
4084 PURBA BARDHAMAN Raina-I Burdwan Division SHUKUR PIPED WATER SUPPLY SCHEME , SM/16255 New Continuation Work Order for supply of inspection Vehicle No. WB42Y- 7403 for inspection of different JJM related(schemes) works as and when required including supply of driver & fuel(minimum 8 hours duty per day) and all taxes etc. for Burdwan Sub Division under Burdwan Division, PHE Dte consider 96.00 Km. run per day (Period from 01-02-2025 to 30-04-2025) JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/001402/2024-2025 240/BSD 31/01/2025 66 PARVIN BEGAM 0.85 0.28 32.94 100
4085 PURBA BARDHAMAN Kalna-II Burdwan Division PATHAR GHATA PIPED WATER SUPPLY SCHEME , SM/16029 New Material Requisition To Resource Division RTOR000086/2023-2024 1962/BWD 25/04/2023 0 Resource Division 32.19 0.00 0 0
4086 PURBA BARDHAMAN Kalna-II Burdwan Division PATHAR GHATA PIPED WATER SUPPLY SCHEME , SM/16029 New Material Requisition To Resource Division RTOR000368/2023-2024 2197/BWD 12/05/2023 0 Resource Division 4.93 0.00 0 0
4087 PURBA BARDHAMAN Kalna-II Burdwan Division PATHAR GHATA PIPED WATER SUPPLY SCHEME , SM/16029 New Work Order for "Restoration of pipeline with other allied works at different places of Akalposh, singa, kadiara, panchrakhi mouja under Patahrghata Pwss due to construction of rcc cover drain & widening of rcc concrete road constructed by PRI body under Kalna-II panchayat samiti under Kalna Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000857/2024-2025 1843/KSD 27/11/2024 15 SUPRITI ENTERPRISE 2.86 0.00 0 0
4088 PURBA BARDHAMAN Kalna-II Burdwan Division PATHAR GHATA PIPED WATER SUPPLY SCHEME , SM/16029 New Work Order for "CONSTRUCTION OF TEMPORARY KIOSK FOR THE NECESSARY ARRANGEMENT OF ELECTRIFICATION OF TUBEWELL FOR PATHARGHATA PWSS UNDER KALNA SUB-DIVISION UNDER BURDWAN DIVISION, PHE DTE." Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/001167/2023-2024 2149/KSD 07/03/2024 10 DEL DELTA CONSTRUCTION 0.66 0.66 100 100
4089 PURBA BARDHAMAN Kalna-II Central Mechanical PATHAR GHATA PIPED WATER SUPPLY SCHEME , SM/16029 New New electric connection for Patharghata PWSS, PH-1. BILL/01880/2023-2024 BP-2023-24-351 11/01/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 5.41 0.00 0 0
4090 PURBA BARDHAMAN Kalna-II Central Mechanical PATHAR GHATA PIPED WATER SUPPLY SCHEME , SM/16029 New New electric connection for Patharghata PWSS, PH-2. BILL/01879/2023-2024 BP-2023-24-351 11/01/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 6.33 0.00 0 0
4091 PURBA BARDHAMAN Kalna-II Burdwan Division PATHAR GHATA PIPED WATER SUPPLY SCHEME , SM/16029 New Different works related (sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of different capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site) to KASIPUR, PATHAR GHATA & SABIDPUR Piped Water Supply Scheme under Kalna ¿ II Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000541/2023-2024 3697/BWD 24/08/2023 770 SUPRITI ENTERPRISE 1,185.67 122.67 10.35 42
4092 PURBA BARDHAMAN Kalna-II Central Mechanical PATHAR GHATA PIPED WATER SUPPLY SCHEME , SM/16029 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at PATHAR GHATA Water Supply Scheme [ Block- KALNA-2] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER Junior Engineer ORD/000901/2023-2024 4165/CMD 29/08/2023 735 J.S. CONSTRUCTION. 28.48 0.00 0 45
4093 PURBA BARDHAMAN Kalna-II Central Mechanical PATHAR GHATA PIPED WATER SUPPLY SCHEME , SM/16029 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Khargakur & others water supply scheme under Kalna-2 Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000116/2024-2025 2393/CMD 02/08/2024 280 HANNAN BUILDERS PVT LTD 76.80 0.00 0 20
4094 PURBA BARDHAMAN Kalna-II Burdwan Division PATHAR GHATA PIPED WATER SUPPLY SCHEME , SM/16029 New Pipeline laying by HDD method and different types of balance works in connection with different Augmentation & New Scheme [(SM/ 08103), (SM/13413), (SM/15587), (SM/16035), (SM/16287), (SM/16029), (SM/15581), (SM/14437), (SM/16028), (SM/16036) & (SM/14425)] within Kalna Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer ORD/001270/2024-2025 849/BWD 05/03/2025 180 S.P. CONSTRUCTION 683.30 0.00 0 0
4095 PURBA BARDHAMAN Purbasthali-I Central Mechanical SHANKRA PIPE WATER SUPPLY SCHEME , SM/16032 New Supply & Installation of Submersible Pumping Machinery , Voltage Stabilizer, Chlorination system and internal House wiring for Tube well no.- 1 & 2 at SHANKRA [PURBASTHALI-I] Water Supply Scheme under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000887/2023-2024 4150/CMD 29/08/2023 30 M/S, S.S. ENTERPRISE. 21.22 0.00 0 0
4096 PURBA BARDHAMAN Purbasthali-I Burdwan Division SHANKRA PIPE WATER SUPPLY SCHEME , SM/16032 New Material Requisition To Resource Division RTOR000305/2023-2024 2197/BWD 12/05/2023 0 Resource Division 8.59 0.00 0 0
4097 PURBA BARDHAMAN Purbasthali-I Burdwan Division SHANKRA PIPE WATER SUPPLY SCHEME , SM/16032 New Material Requisition To Resource Division RTOR000590/2023-2024 4898/BWD 10/11/2023 0 Resource Division 13.06 0.00 0 0
4098 PURBA BARDHAMAN Purbasthali-I Burdwan Division SHANKRA PIPE WATER SUPPLY SCHEME , SM/16032 New Material Requisition To Resource Division RTOR000546/2023-2024 4311/BWD 29/09/2023 0 Resource Division 8.44 0.00 0 0
4099 PURBA BARDHAMAN Purbasthali-I Burdwan Division SHANKRA PIPE WATER SUPPLY SCHEME , SM/16032 New Work order for "Service for land acquisition for different PWSS under JJM of Purbasthali-I block under Kalna Sub-Division, PHE Dte." Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000962/2023-2024 1721/KSD 05/12/2023 91 PARTHA PRATIM ACHARYA 0.96 0.00 0 5
4100 PURBA BARDHAMAN Purbasthali-I Burdwan Division SHANKRA PIPE WATER SUPPLY SCHEME , SM/16032 New Different works related (sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of different capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site) to SHYAMPUR, GAHAK & SHANKRA Piped Water Supply Scheme under Purbasthali I Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000639/2023-2024 3957/BWD 07/09/2023 1051 M/S B. NANDI 758.52 0.00 0 20
4101 PURBA BARDHAMAN Purbasthali-I Central Mechanical SHANKRA PIPE WATER SUPPLY SCHEME , SM/16032 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Manganpur & others water supply scheme under Purbasthali 1 Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000714/2024-2025 2979/CMD 25/11/2024 90 H.K. DAS & CO. 53.27 0.00 0 0
4102 PURBA BARDHAMAN Kalna-II Burdwan Division DWARIATAN PIPED WATER SUPPLY SCHEME , SM/16285 New Material Requisition To Resource Division RTOR000078/2023-2024 1962/BWD 25/04/2023 0 Resource Division 33.94 0.00 0 0
4103 PURBA BARDHAMAN Kalna-II Burdwan Division DWARIATAN PIPED WATER SUPPLY SCHEME , SM/16285 New Material Requisition To Resource Division RTOR000246/2023-2024 2197/BWD 12/05/2023 0 Resource Division 21.09 0.00 0 0
4104 PURBA BARDHAMAN Kalna-II Burdwan Division DWARIATAN PIPED WATER SUPPLY SCHEME , SM/16285 New Work Order "CONSTRUCTION OF TEMPORARY KIOSK FOR THE NECESSARY ARRANGEMENT OF ELECTRIFICATION OF TUBEWELL FOR DWARIATON PWSS UNDER KALNA SUB-DIVISION UNDER BURDWAN DIVISION, PHE DTE." Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/001152/2023-2024 2021/KSD 06/03/2024 10 BISWAS ENTERPRISE 0.66 0.66 100 2
4105 PURBA BARDHAMAN Kalna-II Central Mechanical DWARIATAN PIPED WATER SUPPLY SCHEME , SM/16285 New New Service connection at Dwariatan PWSS PH-1 BILL/02320/2023-2024 BP-2023-24-459 30/01/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 6.24 0.00 0 0
4106 PURBA BARDHAMAN Kalna-II Central Mechanical DWARIATAN PIPED WATER SUPPLY SCHEME , SM/16285 New New electric connection for Dwariatan PWSS, PH-2. BILL/01881/2023-2024 BP-2023-24-353 11/01/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 4.95 0.00 0 0
4107 PURBA BARDHAMAN Kalna-II Burdwan Division DWARIATAN PIPED WATER SUPPLY SCHEME , SM/16285 New Different works related (sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of different capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site) to BALINDAR, CHAK SHIMLA & DWARIATAN Piped Water Supply Scheme under Kalna II Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000539/2023-2024 3700/BWD 24/08/2023 770 SUPRITI ENTERPRISE 1,424.22 29.87 2.1 30
4108 PURBA BARDHAMAN Kalna-II Central Mechanical DWARIATAN PIPED WATER SUPPLY SCHEME , SM/16285 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at DWARIATAN Water Supply Scheme [ Block- KALNA-2] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/001053/2023-2024 4160/CMD 29/08/2023 733 M/S, S.S. ENTERPRISE. 28.48 15.29 53.69 40
4109 PURBA BARDHAMAN Kalna-II Burdwan Division DWARIATAN PIPED WATER SUPPLY SCHEME , SM/16285 New Different types of works involve in connection with Augmentation of TEHATA Zone-I & II (SM/16301) Water Supply Scheme, CHAKSIMLA (SM/15586) Water Supply Scheme & DWARIATON (SM/16285) Water Supply Scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer JUNIOR ENGINEER RWS KALNA2 ORD/000162/2024-2025 2201/BWD 13/06/2024 752 M/S ASHA CONSTRUCTION 449.98 64.42 14.32 25
4110 PURBA BARDHAMAN Burdwan Division RETROFITTING OF MANIKHAR PIPED WATER SUPPLY SCHEME PART-C , SM/16289 Retrofitting Augmentation of MANIKHAR PWSS to accommodate FHTC, Laying Distribution System, Laying Rising Main, under Jal Jeevan Mission of Kalna - I Block, Purba Burdwan District under Burdwan Division, PHE. Dte. Assistant Engineer Junior Engineer, R.W.S. Burdwan Sub Division, P.H.E. Dt ORD/000157/2023-2024 2453/BWD 31/05/2023 60 SETH ENTERPRISE 34.49 34.32 99.51 100
4111 PURBA BARDHAMAN Burdwan Division RETROFITTING OF MANIKHAR PIPED WATER SUPPLY SCHEME PART-C , SM/16289 Retrofitting Work Oder for "Laying of Rising Main and alied work such as brick work, P.C.C. work and dismantling work etc. for Manikhar Piped Water Supply Scheme within Kalna Sub-Division under Burdwan Division, PHE Dte." Assistant Engineer Junior Engineer, R.W.S. Burdwan Sub Division, P.H.E. Dt ORD/000978/2023-2024 1706/KSD 01/12/2023 7 BISWAS ENTERPRISE 0.51 0.47 92.16 100
4112 PURBA BARDHAMAN Burdwan Division RETROFITTING OF MANIKHAR PIPED WATER SUPPLY SCHEME PART-C , SM/16289 Retrofitting Providing FHTC in the left out portion of Manikhar and Jurepara village along with other ancillary work in order to declare Sajal Gram under command area of Manikhar PWSS within Kalna Sub Division under Burdwan Divn., PHE. Dte. Assistant Engineer Junior Engineer, R.W.S. Burdwan Sub Division, P.H.E. Dt ORD/000037/2025-2026 1309/BWD 28/04/2025 30 PRONAB KUMAR DEY 7.80 0.00 0 100
4113 PURBA BARDHAMAN Burdwan Division RETROFITTING OF MANIKHAR PIPED WATER SUPPLY SCHEME PART-C , SM/16289 Retrofitting Arrangement of drinking water supply by installation of solar submersible pump including sinking of 200 mm. dia. Tube well 150 Mtr. Deep by direct rotary rig method, Laying dist. System, FHTC and 2 Nos. 5000 Ltr. PVC tank installation with construction of RCC structure for BHAGABATITALA Habitation which is uncovered of MANIKHAR Piped W/S. Scheme, Block KALNA-1 under Burdwan Division, PHE Dte. Assistant Engineer Junior Engineer, R.W.S. Burdwan Sub Division, P.H.E. Dt ORD/000018/2025-2026 1245/BWD 23/04/2025 45 A.R. TRADERS 30.74 0.00 0 75
4114 PURBA BARDHAMAN Burdwan Division RETROFITTING OF MAJHERGRAM PIPED WATER SUPPLY SCHEME(PART-B) , SM/16290 Retrofitting Sinking of 250 X 150mm dia Tube Well 150 mtr. Depth by D.R. Rig method using UPVC pipe (CM) and UPVC Medium Well Screen (RMS) for 2nd TW Site of Aug. of MAJHERGRAM & its adjoining mouzas Piped Water Supply Scheme, Block Monteswar, Dist - Purba Bardhaman under Burdwan Division, PHE Dte. Assistant Engineer ORD/000542/2022-2023 5094/BWD 17/11/2022 30 DAS CONSTRUCTION 8.71 7.77 89.21 1
4115 PURBA BARDHAMAN Burdwan Division RETROFITTING OF MAJHERGRAM PIPED WATER SUPPLY SCHEME(PART-B) , SM/16290 Retrofitting Interconnection in distribution system from OHR to in between 1st and 2nd Tube Well site for smooth functioning of FHTC work of MAJHERGRAM W/S Scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. ORD/000160/2023-2024 2575/BWD 01/06/2023 30 TULIP ENGINEERS CO-OPERATIVE SOCIETY LTD. 22.54 20.07 89.04 100
4116 PURBA BARDHAMAN Burdwan Division RETROFITTING OF MAJHERGRAM PIPED WATER SUPPLY SCHEME(PART-B) , SM/16290 Retrofitting Laying of UPVC pipeline & providing FHTC work at Dhanyakherur, Majhergram bazar & Hattola village of MAJHERGRAM Water Supply Scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer ORD/000161/2023-2024 2456/BWD 31/05/2023 30 PRONAB KUMAR DEY 9.68 5.61 57.95 100
4117 PURBA BARDHAMAN Burdwan Division RETROFITTING OF MAJHERGRAM PIPED WATER SUPPLY SCHEME(PART-B) , SM/16290 Retrofitting Laying of 75 mm dia HDPE Pipe of Majhergram PWSS of Madhyamgram uttarpara village under Manteswar Block under Durgapur Sub Division of Burdwan Division ,P.H.E.Dte Junior Engineer1, Durgapur Sub-Division, PHE Dte. ORD/000762/2024-2025 908/DSD 28/10/2024 30 M/S GOSWAMI CONSTRUCTION 0.96 0.95 98.96 100
4118 PURBA BARDHAMAN Burdwan Division RETROFITTING OF MAJHERGRAM PIPED WATER SUPPLY SCHEME(PART-B) , SM/16290 Retrofitting Providing FHTC & laying of HDPE pipe line for village of Madhyamgram, Dakshinpara, Binnerpar, Dhanyakherur of MAJHERGRAM PWSS of Manteswer Block under Burdwan Division, PHE Dte. Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer1, Durgapur Sub-Division, PHE Dte. ORD/000174/2024-2025 2251/BWD 18/06/2024 120 A.R. TRADERS 40.92 23.49 57.4 100
4119 PURBA BARDHAMAN Burdwan Division RETROFITTING OF MAJHERGRAM PIPED WATER SUPPLY SCHEME(PART-B) , SM/16290 Retrofitting Painting and others ancillary works related to OHR of MAJHERGRAM PWSS under Durgapur Sub Division of MANTESWER Block under Burdwan Division P.H.E.Dte. Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/001221/2024-2025 728/BWD 24/02/2025 45 A.R. TRADERS 7.02 0.00 0 0
4120 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF JHAUDANGA (PART-B) PIPED WATER SUPPLY SCHEME , SM/16293 Augmentation Sinking of 250 X 150mm dia Tube Well 150 mtr. Depth by D.R. Rig method using UPVC pipe (CM) and UPVC Deep Well Screen (RMS) for 1ST TW Site of JHAUDANGA & its adjoining mouzas Piped Water Supply Scheme, Block Purbasthali II, Dist - Purba Bardhaman under Burdwan Division, PHE Dte. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000720/2023-2024 273/BWD 16/01/2024 30 AUXILIARY TUBE WELL DRILLERS 8.64 7.85 90.86 1
4121 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF JHAUDANGA (PART-B) PIPED WATER SUPPLY SCHEME , SM/16293 Augmentation Construction Pump house and construction (As per drawing no-PHE/SE/CC/PH/DWG-01/ 2022-2023) of new (In same place) Pump House No-2 of JHAUDANGA Water Supply Scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000709/2023-2024 4521/BWD 12/10/2023 60 IYASIN DAFADAR 6.76 6.58 97.34 15
4122 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF JHAUDANGA (PART-B) PIPED WATER SUPPLY SCHEME , SM/16293 Augmentation Digital structurization of pipeline alignment and asset evaluation including holistic design, preparation of design drawings of overall LDS & preparation of estimate for 09 Nos. Piped W/S. Schemes under Purbasthali II Block under Kalna Sub-Division under Burdwan Division, PHE. Dte. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000338/2024-2025 3018/BWD 05/08/2024 50 HORIZEN 23.70 6.17 26.03 10
4123 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF JHAUDANGA (PART-B) PIPED WATER SUPPLY SCHEME , SM/16293 Augmentation Different types of works involve in connection with Augmentation of JHAUDANGA (SM/16293), KASHIPUR (SM/16297), PATULI (SM/09718) & PARULIA (SM/09719) Piped water supply scheme under Purbasthali-II Block, Kalna Sub-Division, PHE Dte. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000163/2024-2025 2202/BWD 13/06/2024 631 MONDAL PRECISION PVT LTD 570.00 78.03 13.69 2
4124 PURBA BARDHAMAN Central Mechanical AUGMENTATION OF PURBASAHAPUR PIPED WATER SUPPLY SCHEME , SM/16193 Augmentation Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination system and internal House wiring for Tube well no.- 1 & 2 at Augmentation of PURBA SAHAPUR[KALNA-II] Water Supply Scheme under CMD, PHE Dte., Dist.- Purba-Bardhaman. ORD/001085/2023-2024 4477/CMD 05/10/2023 30 DUTTA ENTERPRISE 24.40 0.00 0 0
4125 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF PURBASAHAPUR PIPED WATER SUPPLY SCHEME , SM/16193 Augmentation Augmentation of PURBA SAHAPUR PWSS to accommodate FHTC, Laying Distribution System, Laying Rising Main, under Jal Jeevan Mission of Kalna - II Block, Purba Burdwan District under Burdwan Division, PHE. Dte. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000416/2023-2024 3273/BWD 28/07/2023 60 PARTHA PRATIM ACHARYA 21.94 15.27 69.6 80
4126 PURBA BARDHAMAN Burdwan Division RETROFITTING OF SONARUDRA PIPED WATER SUPPLY SCHEME , SM/16349 Retrofitting Augmentation of SONARUDRA PWSS to accommodate FHTC, Laying Distribution System, Laying Rising Main, under Jal Jivan Mission of Purbasthali - I Block, Purba Burdwan District under Burdwan Division, PHE. Dte. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000152/2023-2024 2442/BWD 30/05/2023 60 ROHAN MONDAL 43.32 34.66 80.01 20
4127 PURBA BARDHAMAN Burdwan Division RETROFITTING OF SONARUDRA PIPED WATER SUPPLY SCHEME , SM/16349 Retrofitting Sinking of additional Tube Well, construction of pump house & boundary wall & laying interconnection of SONARUDRA Piped water supply scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. (PP Site- Shyambati Baidyapur). Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000864/2023-2024 5295/BWD 01/12/2023 60 HI-LIGHT ELECTRONICS 27.37 14.41 52.65 60
4128 PURBA BARDHAMAN Burdwan Division RETROFITTING OF SONARUDRA PIPED WATER SUPPLY SCHEME , SM/16349 Retrofitting Laying of 140 mm dia HDPE Pipeline from Sonarudra Head Work Site more to upto Shyambati & Baidyapur more (Sec 34-2-3-6-10-12-14-16-16A-16B) of SONARUDRA W/S Scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000601/2021-2022 1486/BWD 14/03/2022 30 HAMID SK 18.85 10.47 55.54 100
4129 PURBA BARDHAMAN Burdwan Division RETROFITTING OF SONARUDRA PIPED WATER SUPPLY SCHEME , SM/16349 Retrofitting Digital structurization of pipeline alignment and asset evaluation including holistic design, preparation of design drawings of overall LDS & preparation of estimate for 14 Nos. Piped W/S. Schemes under Purbasthali I Block under Kalna Sub-Division under Burdwan Division, PHE. Dte. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000337/2024-2025 3017/BWD 05/08/2024 75 HORIZEN 38.00 3.24 8.53 100
4130 PURBA BARDHAMAN Burdwan Division RETROFITTING OF SONARUDRA PIPED WATER SUPPLY SCHEME , SM/16349 Retrofitting Different Types of work involved in connection with Augmentation of SONARUDRA (SM/16349) & KACHUA (SM/13497) Piped Water Supply Scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000192/2024-2025 2430/BWD 27/06/2024 480 R.G. INFRASTRUCTURE 240.70 23.03 9.57 2
4131 PURBA BARDHAMAN Burdwan-I Burdwan Division NERAGOHALIA PIPED WATER SUPPLY SCHEME , SM/16617 New Material Requisition To Resource Division RTOR000103/2023-2024 1962/BWD 25/04/2023 0 Resource Division 18.38 0.00 0 0
4132 PURBA BARDHAMAN Burdwan-I Burdwan Division NERAGOHALIA PIPED WATER SUPPLY SCHEME , SM/16617 New Material Requisition To Resource Division RTOR000354/2023-2024 2197/BWD 12/05/2023 0 Resource Division 20.45 0.00 0 0
4133 PURBA BARDHAMAN Burdwan-I Burdwan Division NERAGOHALIA PIPED WATER SUPPLY SCHEME , SM/16617 New Material Requisition To Resource Division RTOR000727/2023-2024 5273/BWD 30/11/2023 0 Resource Division 21.07 0.00 0 0
4134 PURBA BARDHAMAN Burdwan-I Burdwan Division NERAGOHALIA PIPED WATER SUPPLY SCHEME , SM/16617 New Sinking of Tube-wells, LDS, Rising Main, FHTC, Construction of 350 cum capacity RCC OHR with 20.0 mtr. with Staging height including soil investigation, construction of switch room, boundary walls with gates, land development, surface drains and internal pathways at different TW site for NERAGOHALIA Piped Water Supply Scheme under BURDWAN-I Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000478/2023-2024 3493/BWD 09/08/2023 365 M/S ASHA CONSTRUCTION 577.52 207.48 35.93 35
4135 PURBA BARDHAMAN Burdwan-I Central Mechanical NERAGOHALIA PIPED WATER SUPPLY SCHEME , SM/16617 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at MALKITA & others water supply scheme under Bardhaman-I Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman ASSISTANT ENGINEER Junior Engineer ORD/000066/2024-2025 2388/CMD 02/08/2024 90 ELECTRICAL & MECHANICAL ENGINEERING CORPORATION 55.95 0.00 0 0
4136 PURBA BARDHAMAN Burdwan-I Central Mechanical NERAGOHALIA PIPED WATER SUPPLY SCHEME , SM/16617 New Quotation for new service connection at NARAGOHALIA W/S Scheme PH-I. BILL/01814/2023-2024 BP-2023-24-321 30/12/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 4.28 0.00 0 0
4137 PURBA BARDHAMAN Burdwan-I Central Mechanical NERAGOHALIA PIPED WATER SUPPLY SCHEME , SM/16617 New New service connection charges for Neragohalia PWSS TW-2 BILL/02205/2023-2024 BP-2023-24-391 17/01/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 7.09 0.00 0 0
4138 PURBA BARDHAMAN Burdwan-I Central Mechanical NERAGOHALIA PIPED WATER SUPPLY SCHEME , SM/16617 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at Neragohalia Water Supply Scheme [ Block- Burdwan-1 ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER Junior Engineer ORD/000660/2023-2024 4003/CMD 29/08/2023 30 DUTTA ENTERPRISE 28.98 0.00 0 60
4139 PURBA BARDHAMAN Burdwan-I Burdwan Division NERAGOHALIA PIPED WATER SUPPLY SCHEME , SM/16617 New Restoration of Conc. road, Providing leftout FHTC with extension of Pipeline, construction of Pathway, drain, repairing of Pump House at Head Work site with allied works for MAGRA, SANUI, SATGACHIA Zone-I & NARAGOHALIA PIPED WATER SUPPLY SCHEME, Block-Memari-I, within Burdwan Sub Division under Burdwan Division PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/001192/2024-2025 611/BWD 11/02/2025 180 M/S ASHA CONSTRUCTION 354.13 0.00 0 25
4140 PURBA BARDHAMAN Mangolkote Burdwan Division BALIDANGA PIPE WATER SUPPLY SCHEME , SM/18315 New Material Requisition To Resource Division RTOR000409/2023-2024 3871/BWD 01/09/2023 0 Resource Division 88.34 0.00 0 0
4141 PURBA BARDHAMAN Mangolkote Burdwan Division BALIDANGA PIPE WATER SUPPLY SCHEME , SM/18315 New Material Requisition To Resource Division RTOR000225/2023-2024 2155/BWD 10/05/2023 0 Resource Division 13.45 0.00 0 0
4142 PURBA BARDHAMAN Mangolkote Burdwan Division BALIDANGA PIPE WATER SUPPLY SCHEME , SM/18315 New Material Requisition To Resource Division RTOR000649/2023-2024 5097/BWD 23/11/2023 0 Resource Division 19.96 0.00 0 0
4143 PURBA BARDHAMAN Mangolkote Burdwan Division BALIDANGA PIPE WATER SUPPLY SCHEME , SM/18315 New Supply of 1 (one) No. Inspection Vehicle for different JJM Related Works as and when required including supply of driver and fuels (Minimum 8 Hours of duty) under Katwa Sub-Division within Burdwan Division, P.H.E. Dte. Consider 96.00 Km run per Day. Assistant Engineer JUNIOR ENGINEER KATWA SUB-DIVISION PHE DTE ORD/001080/2023-2024 22/KTS 05/01/2024 70 AJIT SAMANTA 0.90 0.30 33.33 100
4144 PURBA BARDHAMAN Mangolkote Central Mechanical BALIDANGA PIPE WATER SUPPLY SCHEME , SM/18315 New NEW SERVICE CONNECTION FOR BALIDANGA PWSS. BILL/02474/2023-2024 BP-2023-24-530 13/02/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 4.70 0.00 0 0
4145 PURBA BARDHAMAN Mangolkote Central Mechanical BALIDANGA PIPE WATER SUPPLY SCHEME , SM/18315 New NEW SERVICE CONNECTION FOR BALIDANGA PWSS. BILL/02475/2023-2024 BP-2023-24-531 13/02/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 12.76 0.00 0 0
4146 PURBA BARDHAMAN Mangolkote Burdwan Division BALIDANGA PIPE WATER SUPPLY SCHEME , SM/18315 New BALIDANGA Piped Water Supply Scheme with sinking of Tube-well, LDS, Rising Main, FHTC, Construction of 300 cum capacity RCC OHR with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drain and internal pathway at different TW site under Mongolkote Block, District:- Purba-Bardhaman [NEW SCHEME]_2ND CALL Assistant Engineer JUNIOR ENGINEER KATWA SUB-DIVISION PHE DTE ORD/000457/2023-2024 3439/BWD 08/08/2023 365 M/S S.S. ENTERPRISE 567.39 242.94 42.82 27
4147 PURBA BARDHAMAN Mangolkote Central Mechanical BALIDANGA PIPE WATER SUPPLY SCHEME , SM/18315 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at BALIDANGA Water Supply Scheme [ Block- MANGOLKOTE ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. Driller In-Charge Junior Engineer ORD/000883/2023-2024 4146/CMD 29/08/2023 563 CHOUDHURY ENTERPRISE 29.70 11.54 38.86 46
4148 PURBA BARDHAMAN Mangolkote Central Mechanical BALIDANGA PIPE WATER SUPPLY SCHEME , SM/18315 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Lakshimpur & others water supply scheme under Mangalkote Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman Driller In-Charge Junior Engineer ORD/000097/2024-2025 2406/CMD 02/08/2024 290 CHOUDHURY ENTERPRISE 57.65 0.00 0 10
4149 PURBA BARDHAMAN Mangolkote Burdwan Division BALIDANGA PIPE WATER SUPPLY SCHEME , SM/18315 New Balance work for OHR, Extension of pipeline to provide FHTC in NAYAPARA IRSANDA, SALANDA & KALAIPARA mouza with sinking of Tubewell, Construction of Pump house, Boundary wall, Land Development, Plinth Protection for pump house & OHR under BALIDANGA PWSS, Katwa Sub-Division, Block- Mongolkote, Burdwan Division PHE Dte. Assistant Engineer JUNIOR ENGINEER KATWA SUB-DIVISION PHE DTE ORD/000684/2024-2025 3654/BWD 21/10/2024 316 CHIRANJIB DAS 174.81 0.00 0 26
4150 PURBA BARDHAMAN Mangolkote Central Mechanical BALIDANGA PIPE WATER SUPPLY SCHEME , SM/18315 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-3 at Balidanga Water Supply Scheme [ BLOCK- Mangalkote ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. Driller In-Charge Junior Engineer ORD/001395/2024-2025 884/CMD 26/03/2025 60 M/S, S.S. ENTERPRISE. 12.30 0.00 0 0
4151 PURBA BARDHAMAN Raina-I Burdwan Division BHAGABATIPUR PIPED WATER SUPPLY SCHEME , SM/14977 New Material Requisition To Resource Division RTOR000205/2023-2024 2155/BWD 10/05/2023 0 Resource Division 5.77 0.00 0 0
4152 PURBA BARDHAMAN Raina-I Burdwan Division BHAGABATIPUR PIPED WATER SUPPLY SCHEME , SM/14977 New Material Requisition To Resource Division RTOR000534/2023-2024 4286/BWD 29/09/2023 0 Resource Division 1.53 0.00 0 0
4153 PURBA BARDHAMAN Raina-I Burdwan Division BHAGABATIPUR PIPED WATER SUPPLY SCHEME , SM/14977 New Material Requisition To Resource Division RTOR000656/2023-2024 5101/BWD 23/11/2023 0 Resource Division 20.46 0.00 0 0
4154 PURBA BARDHAMAN Raina-I Burdwan Division BHAGABATIPUR PIPED WATER SUPPLY SCHEME , SM/14977 New Different works related (sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of different capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site) to BHAGABATIPUR, MACHKHARA & UDGARA Piped Water Supply Scheme under Raina ¿ I Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000690/2023-2024 4386/BWD 05/10/2023 365 SK ALIM 1,378.97 251.83 18.26 55
4155 PURBA BARDHAMAN Raina-I Burdwan Division BHAGABATIPUR PIPED WATER SUPPLY SCHEME , SM/14977 New Continuation Work Order for supply of inspection Vehicle for inspection of different JJM related(schemes)works as and when required including supply of driver & fuel(minimum 8 hours duty per day) and all taxes etc. for Burdwan Sub-Division under Burdwan Division,PHE Dte consider 96.00 Km. run per day (Period from 01-05-2024 to 31-07-2024) JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000108/2024-2025 807/BSD 29/04/2024 66 PARVIN BEGAM 0.85 0.28 32.94 100
4156 PURBA BARDHAMAN Raina-I Central Mechanical BHAGABATIPUR PIPED WATER SUPPLY SCHEME , SM/14977 New New electric connection for Bhagabatipur PWSS, PH-1 BILL/01886/2023-2024 BP-2023-24-343 11/01/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.15 0.00 0 0
4157 PURBA BARDHAMAN Raina-I Central Mechanical BHAGABATIPUR PIPED WATER SUPPLY SCHEME , SM/14977 New New Service connection for BHAGABATIPUR W/S Scheme PH No.-1 BILL/01795/2023-2024 BP-2023-24-312 30/12/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 7.93 0.00 0 0
4158 PURBA BARDHAMAN Raina-I Central Mechanical BHAGABATIPUR PIPED WATER SUPPLY SCHEME , SM/14977 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Bajitpur, Belsar & other water supply scheme under Raina-1 Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000117/2024-2025 2589/CMD 27/08/2024 90 DEY ENTERPRISE 74.58 0.00 0 10
4159 PURBA BARDHAMAN Raina-I Burdwan Division BHAGABATIPUR PIPED WATER SUPPLY SCHEME , SM/14977 New Balance work [i.e. Extension or parallel Pipeline, Leftout FHTC, Road Restoration work, Sinking of Additional Tube Well with Pump House & Boundary wall, inter Connection of Additional Tube Well, Construction of M.S.Structural bridge, canal Crossing, MS casing with allied work of Bhagabatipur, Machkhara, Udgara, Bantir, Chakpurohit Rasuikhanda, Sankarpur, Gopalpur & Belshar PWSS Block-RAINA- I under Burdwan Sub Division, PHE Dte. within Burdwan Division PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/001103/2024-2025 469/BWD 24/01/2025 366 SK ALIM 1,353.91 0.00 0 25
4160 PURBA BARDHAMAN Raina-I Burdwan Division BHAGABATIPUR PIPED WATER SUPPLY SCHEME , SM/14977 New Continuation Work Order for supply of inspection Vehicle for inspection of different JJM related (schemes) works as and when required including supply of driver & fuel(minimum 8 hours duty per day) and all taxes etc. for Burdwan Sub-Division under Burdwan Division,PHE Dte consider 96.00 Km. run per day (Period from 01-08-2025 to 31-10-2025) JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000703/2025-2026 2019/BSD 31/07/2025 66 PARVIN BEGAM 0.85 0.00 0 0
4161 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED RADGANAGAR BAGHANAPARA PWSS TO ACCOMMODATE FHTC IN KALNA I BLOCK UNDER KALNA SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/09873 Augmentation Preparation of DPR for augmentation of Radhanagar-Baghnapara W/S Scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. (Sl No-B) Assistant Engineer ORD/000579/2021-2022 214/KSD 24/02/2022 21 ROY CHOUDHURI CONSTRUCTION 2.96 0.00 0 1
4162 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED RADGANAGAR BAGHANAPARA PWSS TO ACCOMMODATE FHTC IN KALNA I BLOCK UNDER KALNA SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/09873 Augmentation Preparation of DPR for augmentation of Radhanagar-Baghnapara W/S Scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. (Sl No-B) Assistant Engineer ORD/000580/2021-2022 214/KSD 24/02/2022 21 ROY CHOWDHURY ASSOCIATES 2.96 2.95 99.66 0
4163 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED RADGANAGAR BAGHANAPARA PWSS TO ACCOMMODATE FHTC IN KALNA I BLOCK UNDER KALNA SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/09873 Augmentation Supply of materials for different water supply scheme under Burdwan Division, PHE Dte. VCH/001578/2021-2022 1207/DW 10/03/2022 0 EXECUTIVE ENGINEER, RESOURCES DIVISION, P.H.E. DTE. 3,005.00 0.00 0 0
4164 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED RADGANAGAR BAGHANAPARA PWSS TO ACCOMMODATE FHTC IN KALNA I BLOCK UNDER KALNA SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/09873 Augmentation Material Requisition To Resource Division RTOR000037/2021-2022 537/BWD 27/01/2022 0 Resource Division 17.54 0.00 0 0
4165 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED RADGANAGAR BAGHANAPARA PWSS TO ACCOMMODATE FHTC IN KALNA I BLOCK UNDER KALNA SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/09873 Augmentation Material Requisition To Resource Division RTOR000221/2021-2022 1544/BWD 15/03/2022 0 Resource Division 0.37 0.00 0 0
4166 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED RADGANAGAR BAGHANAPARA PWSS TO ACCOMMODATE FHTC IN KALNA I BLOCK UNDER KALNA SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/09873 Augmentation Material Requisition To Resource Division RTOR000193/2021-2022 1375/BWD 09/03/2022 0 Resource Division 4.85 0.00 0 0
4167 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED RADGANAGAR BAGHANAPARA PWSS TO ACCOMMODATE FHTC IN KALNA I BLOCK UNDER KALNA SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/09873 Augmentation Material Requisition To Resource Division RTOR000018/2022-2023 3277/BWD 29/07/2022 0 Resource Division 65.16 0.00 0 0
4168 PURBA BARDHAMAN Central Mechanical AUGMENTATION OF GROUND WATER BASED RADGANAGAR BAGHANAPARA PWSS TO ACCOMMODATE FHTC IN KALNA I BLOCK UNDER KALNA SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/09873 Augmentation Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.- 3 at Augumentation of Radhanagar Baghnapara Water Supply Scheme [ BLOCK- Kalna-I ]under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/001643/2023-2024 1625/CMD 15/03/2024 30 JOYGURU ENTERPRISE 12.31 0.00 0 0
4169 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED RADGANAGAR BAGHANAPARA PWSS TO ACCOMMODATE FHTC IN KALNA I BLOCK UNDER KALNA SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/09873 Augmentation Augmentation of Radhanagar Baghnapara Piped Water Supply Scheme with LDS, FHTC, Rising main, Construction of 200 cum capacity OHR with 20.0 mtr. Staging height inclusive of soil investigation & repairing of existing 180 cum OHR with repairing of switch rooms, boundary walls at different TW site under Kalna-I Block, District:- Purba-Burdwan Assistant Engineer Junior Engineer, R.W.S. Burdwan Sub Division, P.H.E. Dt ORD/000476/2023-2024 3511/BWD 10/08/2023 598 INDIAN ENGINEERS CO.-OPERATIVE SOCIETY LTD. 458.55 165.42 36.07 70
4170 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED RADGANAGAR BAGHANAPARA PWSS TO ACCOMMODATE FHTC IN KALNA I BLOCK UNDER KALNA SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/09873 Augmentation Sinking of additional Tube Well, construction of pump house & boundary wall & laying interconnection of RADHANAGAR BAGHNAPARA Piped water supply scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. (PP Site- Khaspur Karim Gachhi). Assistant Engineer Junior Engineer, R.W.S. Burdwan Sub Division, P.H.E. Dt ORD/000882/2023-2024 5483/BWD 13/12/2023 416 MUKHERJEE ENTERPRISE 26.91 14.32 53.21 45
4171 PURBA BARDHAMAN Memari-II Burdwan Division BIJUR PIPED WATER SUPPLY SCHEME , SM/18605 New Material Requisition To Resource Division RTOR000261/2023-2024 2197/BWD 12/05/2023 0 Resource Division 3.36 0.00 0 0
4172 PURBA BARDHAMAN Memari-II Burdwan Division BIJUR PIPED WATER SUPPLY SCHEME , SM/18605 New Material Requisition To Resource Division RTOR000658/2023-2024 5116/BWD 23/11/2023 0 Resource Division 20.46 0.00 0 0
4173 PURBA BARDHAMAN Memari-II Central Mechanical BIJUR PIPED WATER SUPPLY SCHEME , SM/18605 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at NOAHATI & others water supply scheme under Memari-II Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. ASSISTANT ENGINEER Junior Engineer ORD/000102/2024-2025 2395/CMD 02/08/2024 90 S.G. TECHNICAL SERVICES 36.99 0.00 0 0
4174 PURBA BARDHAMAN Memari-II Central Mechanical BIJUR PIPED WATER SUPPLY SCHEME , SM/18605 New New service connection for BIJUR PWSS TW 2. BILL/02441/2023-2024 BP-2023-24-526 09/02/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 1.86 0.00 0 0
4175 PURBA BARDHAMAN Memari-II Central Mechanical BIJUR PIPED WATER SUPPLY SCHEME , SM/18605 New New service connection at Bijur PWSS PH-1 BILL/02355/2023-2024 BP-2023-24-469 31/01/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 2.66 0.00 0 0
4176 PURBA BARDHAMAN Memari-II Central Mechanical BIJUR PIPED WATER SUPPLY SCHEME , SM/18605 New New service connection for BIJUR PWSS TW 1. BILL/02440/2023-2024 BP-2023-24-527 09/02/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 0.70 0.00 0 0
4177 PURBA BARDHAMAN Memari-II Central Mechanical BIJUR PIPED WATER SUPPLY SCHEME , SM/18605 New New service connection at Bijur PWSS PH-2 BILL/02353/2023-2024 BP-2023-24-470 31/01/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 5.63 0.00 0 0
4178 PURBA BARDHAMAN Memari-II Burdwan Division BIJUR PIPED WATER SUPPLY SCHEME , SM/18605 New Different works related (sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of different capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site) to BIJUR & REAN Piped Water Supply Scheme under Memari ¿ II Block, District:- Purba-Bardhaman [NEW SCHEME]_2ND CALL Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000481/2023-2024 3495/BWD 09/08/2023 965 NATIONAL CONSTRUCTION 1,175.31 375.08 31.91 85
4179 PURBA BARDHAMAN Memari-II Burdwan Division BIJUR PIPED WATER SUPPLY SCHEME , SM/18605 New Different Types of work involved in connection with different New Schemes (05 Nos.) Piped Water Supply Scheme under Memari II Block within Burdwan Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000003/2025-2026 1116/BWD 03/04/2025 120 SOFIQUL ISLAM 176.89 0.00 0 0
4180 PURBA BARDHAMAN Memari-I Central Mechanical CHANCHAL PIPED WATER SUPPLY SCHEME , SM/18609 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1, 2 & 3 at CHANCHAL Water Supply Scheme [ Block- MEMARI-1 ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER Junior Engineer ORD/000788/2023-2024 4078/CMD 29/08/2023 30 UNIVERSAL ENTERPRISES 44.10 0.00 0 0
4181 PURBA BARDHAMAN Memari-I Burdwan Division CHANCHAL PIPED WATER SUPPLY SCHEME , SM/18609 New Material Requisition To Resource Division RTOR000291/2023-2024 2197/BWD 12/05/2023 0 Resource Division 17.41 0.00 0 0
4182 PURBA BARDHAMAN Memari-I Burdwan Division CHANCHAL PIPED WATER SUPPLY SCHEME , SM/18609 New Material Requisition To Resource Division RTOR000532/2023-2024 4294/BWD 29/09/2023 0 Resource Division 1.69 0.00 0 0
4183 PURBA BARDHAMAN Memari-I Burdwan Division CHANCHAL PIPED WATER SUPPLY SCHEME , SM/18609 New Material Requisition To Resource Division RTOR000572/2023-2024 4922/BWD 10/11/2023 0 Resource Division 41.11 0.00 0 0
4184 PURBA BARDHAMAN Memari-I Central Mechanical CHANCHAL PIPED WATER SUPPLY SCHEME , SM/18609 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at SAHAPUR & others water supply scheme under Memari-I Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. ASSISTANT ENGINEER Junior Engineer ORD/000100/2024-2025 2392/CMD 02/08/2024 90 MITRA ENTERPRISE 47.62 0.00 0 0
4185 PURBA BARDHAMAN Memari-I Central Mechanical CHANCHAL PIPED WATER SUPPLY SCHEME , SM/18609 New New Service connection for Chanchal PWSS TW-1. BILL/02335/2023-2024 BP-2023-24-476 31/01/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 9.26 0.00 0 0
4186 PURBA BARDHAMAN Memari-I Central Mechanical CHANCHAL PIPED WATER SUPPLY SCHEME , SM/18609 New New Service connection for Chanchal PWSS TW-2. BILL/02334/2023-2024 BP-2023-24-477 31/01/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 14.29 0.00 0 0
4187 PURBA BARDHAMAN Memari-I Burdwan Division CHANCHAL PIPED WATER SUPPLY SCHEME , SM/18609 New Shifting of 11KV HTOH Line for construction of new OHR of Chanchal pwss under Burdwan Division, PHE Dte. [Ref ID-860319929, App ID-100000124989, dt.-10/12/2024] BILL/01092/2024-2025 1172/JJM 17/12/2024 0 WBSEDCL 7.00 0.00 0 0
4188 PURBA BARDHAMAN Memari-I Burdwan Division CHANCHAL PIPED WATER SUPPLY SCHEME , SM/18609 New Different works related (sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of different capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site) to CHANCHAL & NUDIPUR Piped Water Supply Scheme under Memari I Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000692/2023-2024 4389/BWD 05/10/2023 730 MANASH GHOSH 1,343.97 198.66 14.78 45
4189 PURBA BARDHAMAN Memari-I Burdwan Division CHANCHAL PIPED WATER SUPPLY SCHEME , SM/18609 New Continuation Work Order for supply of inspection Vehicle No. WB42Y- 7403 for inspection of different JJM related (schemes) works as and when required including supply of driver & fuel(minimum 8 hours duty per day) and all taxes etc. for Burdwan Sub Division under Burdwan Division, PHE Dte consider 96.00 Km. run per day (Period from 01-05-2025 to 31-07-2025) JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000181/2025-2026 960/BSD 30/04/2025 66 PARVIN BEGAM 0.85 0.00 0 100
4190 PURBA BARDHAMAN Raina-II Burdwan Division DIGHRA PIPED WATER SUPPLY SCHEME , SM/18482 New Material Requisition To Resource Division RTOR000421/2023-2024 3861/BWD 01/09/2023 0 Resource Division 15.75 0.00 0 0
4191 PURBA BARDHAMAN Raina-II Burdwan Division DIGHRA PIPED WATER SUPPLY SCHEME , SM/18482 New Material Requisition To Resource Division RTOR000248/2023-2024 2197/BWD 12/05/2023 0 Resource Division 15.00 0.00 0 0
4192 PURBA BARDHAMAN Raina-II Burdwan Division DIGHRA PIPED WATER SUPPLY SCHEME , SM/18482 New Material Requisition To Resource Division RTOR000666/2023-2024 5087/BWD 23/11/2023 0 Resource Division 20.46 0.00 0 0
4193 PURBA BARDHAMAN Raina-II Central Mechanical DIGHRA PIPED WATER SUPPLY SCHEME , SM/18482 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Satinandi,Sanko & others water supply scheme under Galsi-1 Block ; Serpur, Uchalan & others water supply scheme under Raina-2 Block and maro, loapur & others water supply scheme under Galsi-2 block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000397/2024-2025 2751/CMD 24/09/2024 90 ORIENTAL ENGINEERING CO. 88.42 0.00 0 0
4194 PURBA BARDHAMAN Raina-II Burdwan Division DIGHRA PIPED WATER SUPPLY SCHEME , SM/18482 New Material Requisition To Resource Division RTOR000011/2024-2025 4113/BWD 25/11/2024 0 Resource Division 17.04 0.00 0 0
4195 PURBA BARDHAMAN Raina-II Central Mechanical DIGHRA PIPED WATER SUPPLY SCHEME , SM/18482 New NEW SERVICE CONNECTION FOR DIGHRA PWSS BILL/02590/2023-2024 BP-2023-24-556 20/02/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 5.16 0.00 0 0
4196 PURBA BARDHAMAN Raina-II Central Mechanical DIGHRA PIPED WATER SUPPLY SCHEME , SM/18482 New New Service connection for Dighra W/S Scheme PH No.-I BILL/01796/2023-2024 BP-2023-24-322 30/12/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 5.03 0.00 0 0
4197 PURBA BARDHAMAN Raina-II Burdwan Division DIGHRA PIPED WATER SUPPLY SCHEME , SM/18482 New DIGHRA Piped Water Supply Scheme with sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of 350 cum capacity RCC OHRs with 20.0 mtr. Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site under RAINA-II Block, District:- Purba Bardhaman [NEW SCHEME] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000485/2023-2024 3506/BWD 10/08/2023 875 M/S PIONEER CONSTRUCTION 661.73 273.47 41.33 75
4198 PURBA BARDHAMAN Katwa-I Burdwan Division KASIGRAM PIPE WATER SUPPLY SCHEME , SM/18367 New Material Requisition To Resource Division RTOR000318/2023-2024 2197/BWD 12/05/2023 0 Resource Division 11.67 0.00 0 0
4199 PURBA BARDHAMAN Katwa-I Burdwan Division KASIGRAM PIPE WATER SUPPLY SCHEME , SM/18367 New Material Requisition To Resource Division RTOR000431/2023-2024 3855/BWD 01/09/2023 0 Resource Division 68.67 0.00 0 0
4200 PURBA BARDHAMAN Katwa-I Burdwan Division KASIGRAM PIPE WATER SUPPLY SCHEME , SM/18367 New Different works related (sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of different capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site) to BAGHTONA, & KASIGRAM Piped Water Supply Scheme under Katwa ¿ I Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer JUNIOR ENGINEER KATWA SUB-DIVISION PHE DTE ORD/000390/2023-2024 3199/BWD 24/07/2023 527 MANASH GHOSH 1,161.82 610.45 52.54 95
4201 PURBA BARDHAMAN Katwa-I Central Mechanical KASIGRAM PIPE WATER SUPPLY SCHEME , SM/18367 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Jajigram & others water supply scheme under Katwa-I Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman Driller In-Charge Junior Engineer ORD/000069/2024-2025 2399/CMD 02/08/2024 90 SUBRATA BHADRA 55.16 0.00 0 0
4202 PURBA BARDHAMAN Katwa-I Central Mechanical KASIGRAM PIPE WATER SUPPLY SCHEME , SM/18367 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1, 2 & 3 at KASIGRAM Water Supply Scheme [ Block-KATWA-1 ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. Driller In-Charge Junior Engineer ORD/000881/2023-2024 4144/CMD 29/08/2023 492 M/S. SWAPAN BANERJEE 45.09 37.53 83.23 90
4203 PURBA BARDHAMAN Katwa-I Burdwan Division KASIGRAM PIPE WATER SUPPLY SCHEME , SM/18367 New Material Requisition To Resource Division RTOR000020/2024-2025 4104/BWD 25/11/2024 0 Resource Division 6.95 0.00 0 0
4204 PURBA BARDHAMAN Katwa-I Central Mechanical KASIGRAM PIPE WATER SUPPLY SCHEME , SM/18367 New New service connection for Kasigram PWSS PH-1. BILL/02909/2023-2024 BP-2023-24-616 07/03/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 4.69 0.00 0 0
4205 PURBA BARDHAMAN Katwa-I Central Mechanical KASIGRAM PIPE WATER SUPPLY SCHEME , SM/18367 New New service connection for Kasigram PWSS PH-3. BILL/02907/2023-2024 BP-2023-24-618 07/03/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 2.73 0.00 0 0
4206 PURBA BARDHAMAN Katwa-I Central Mechanical KASIGRAM PIPE WATER SUPPLY SCHEME , SM/18367 New New service connection for Kashigram PWSS PH-2. BILL/02908/2023-2024 BP-2023-24-617 07/03/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 1.06 0.00 0 0
4207 PURBA BARDHAMAN Katwa-I Burdwan Division KASIGRAM PIPE WATER SUPPLY SCHEME , SM/18367 New Continuation work order for Supply of 1 (one) No. Diesel driven Ambassador Car (Luxury Taxi) / Motor Cab on hire basis for the Office of the Assistant Engineer, under Katwa Sub-Division within Burdwan Division, P.H.E. Dte. [Period from 01.07.2025 to 31.12.2025]. Assistant Engineer JUNIOR ENGINEER KATWA SUB-DIVISION PHE DTE ORD/000319/2025-2026 1595/KTS 30/06/2025 184 KRISHNA MONDAL 2.40 0.00 0 33
4208 PURBA BARDHAMAN Central Mechanical AUGMENTATION OF SIMLON PWSS FOR PROVIDING FUNCTIONAL HOUSEHOLD TAP CONNECTION (FHTC) BLOCK KALNA I PURBA BARDHAMAN WEST BENGAL , SM/18439 Augmentation Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination system and internal House wiring for Tube well no.- 1 & 2 at Augumentation of SIMLON (ZONE-I & II) [KALNA-I] Water Supply Scheme under CMD, PHE Dte., Dist.- Purba-Bardhaman. ORD/001301/2023-2024 259/CMD 19/01/2024 30 DUTTA ENTERPRISE 24.40 0.00 0 0
4209 PURBA BARDHAMAN Central Mechanical AUGMENTATION OF SIMLON PWSS FOR PROVIDING FUNCTIONAL HOUSEHOLD TAP CONNECTION (FHTC) BLOCK KALNA I PURBA BARDHAMAN WEST BENGAL , SM/18439 Augmentation Illumination arrangement and miscellaneous works at Simlon water supply scheme under Kalna-1 Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000402/2024-2025 2781/CMD 01/10/2024 60 SUDIPTA GHOSH 9.50 0.00 0 0
4210 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF SIMLON PWSS FOR PROVIDING FUNCTIONAL HOUSEHOLD TAP CONNECTION (FHTC) BLOCK KALNA I PURBA BARDHAMAN WEST BENGAL , SM/18439 Augmentation Laying of rising main along with crossing of pipe line by HDD/Jack pushing method due to widening of Bardhaman-Kalna Road via Simlon in connection with Augmentation of SIMLON Piped Water Supply Scheme under Kalna Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000129/2024-2025 2070/BWD 07/06/2024 120 MANASH GHOSH 199.36 199.36 100 100
4211 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF SIMLON PWSS FOR PROVIDING FUNCTIONAL HOUSEHOLD TAP CONNECTION (FHTC) BLOCK KALNA I PURBA BARDHAMAN WEST BENGAL , SM/18439 Augmentation Digital structurization of pipeline alignment and asset evaluation including holistic design, preparation of design drawings of overall LDS & preparation of estimate for 11 Nos. Piped W/S. Schemes under Kalna I Block under Kalna Sub-Division under Burdwan Division, PHE. Dte. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000335/2024-2025 3015/BWD 05/08/2024 60 HORIZEN 29.60 11.10 37.5 10
4212 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF SIMLON PWSS FOR PROVIDING FUNCTIONAL HOUSEHOLD TAP CONNECTION (FHTC) BLOCK KALNA I PURBA BARDHAMAN WEST BENGAL , SM/18439 Augmentation Quotation from WBSEDCL for Shifting of 33 KV & LTOH line at Briddhapara village against 1st T.W. of Simlon w/s scheme. BILL/00172/2024-2025 270/JJM 21/05/2024 0 WBSEDCL 14.29 0.00 0 0
4213 PURBA BARDHAMAN Central Mechanical AUGMENTATION OF SIMLON PWSS FOR PROVIDING FUNCTIONAL HOUSEHOLD TAP CONNECTION (FHTC) BLOCK KALNA I PURBA BARDHAMAN WEST BENGAL , SM/18439 Augmentation Quotation for new service connection at Simlon Zone-2 PWSS TW-1. BILL/01190/2024-2025 BP-2024-25-411 11/12/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.61 0.00 0 0
4214 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF SIMLON PWSS FOR PROVIDING FUNCTIONAL HOUSEHOLD TAP CONNECTION (FHTC) BLOCK KALNA I PURBA BARDHAMAN WEST BENGAL , SM/18439 Augmentation AUGMENTATION OF SIMLON Piped Water Supply Scheme with sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of 500 cum capacity RCC OHRs with 20.0 mtr. Staging height including soil investigation (2 Nos.) & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site OF ZONE-I & ZONE-II under KALNA-I Block, District:- Purba Bardhaman. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE,Junior Engineer, R.W.S. Burdwan Sub Division, P.H.E. Dt ORD/000460/2023-2024 3442/BWD 08/08/2023 603 MANASH GHOSH 1,406.99 980.63 69.7 60
4215 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF SIMLON PWSS FOR PROVIDING FUNCTIONAL HOUSEHOLD TAP CONNECTION (FHTC) BLOCK KALNA I PURBA BARDHAMAN WEST BENGAL , SM/18439 Augmentation Supply & Laying of 300mm Dia M.S.E.R.W Pipe including Jack Pushing along with other allied work in connection with different Augmentation & New [(SM/18439, SM/14437, SM/14435, SM/07805, SM/14440, SM/15571, SM/08030, SM/16014, SM/15588, SM/16298 & SM/16307)] under Kalna Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/001187/2024-2025 608/BWD 11/02/2025 361 MANASH GHOSH 1,209.62 0.00 0 51
4216 PURBA BARDHAMAN Manteswar Burdwan Division GROUND WATER SUPPLY BASED PIPED WATER SUPPLY SCHEME FOR UJNA PWSS IN MANTESHWAR BLOCK OF PURBA BARDHAMAN DISTRICT UNDER BURDWAN DIVISION PHE DTE , SM/18422 New Material Requisition To Resource Division RTOR000333/2023-2024 2197/BWD 12/05/2023 0 Resource Division 19.69 0.00 0 0
4217 PURBA BARDHAMAN Manteswar Burdwan Division GROUND WATER SUPPLY BASED PIPED WATER SUPPLY SCHEME FOR UJNA PWSS IN MANTESHWAR BLOCK OF PURBA BARDHAMAN DISTRICT UNDER BURDWAN DIVISION PHE DTE , SM/18422 New Material Requisition To Resource Division RTOR000447/2023-2024 3971/BWD 08/09/2023 0 Resource Division 129.95 0.00 0 0
4218 PURBA BARDHAMAN Manteswar Central Mechanical GROUND WATER SUPPLY BASED PIPED WATER SUPPLY SCHEME FOR UJNA PWSS IN MANTESHWAR BLOCK OF PURBA BARDHAMAN DISTRICT UNDER BURDWAN DIVISION PHE DTE , SM/18422 New New service connection charges for Ujna PWSS TW-2 BILL/01708/2023-2024 BP-2023-24-235 06/12/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.34 0.00 0 0
4219 PURBA BARDHAMAN Manteswar Central Mechanical GROUND WATER SUPPLY BASED PIPED WATER SUPPLY SCHEME FOR UJNA PWSS IN MANTESHWAR BLOCK OF PURBA BARDHAMAN DISTRICT UNDER BURDWAN DIVISION PHE DTE , SM/18422 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1, 2 & 3 at UJNA Water Supply Scheme [ Block- MONTESWAR ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000781/2023-2024 4074/CMD 29/08/2023 30 CONCORD ENGINEERING 44.42 35.37 79.63 90
4220 PURBA BARDHAMAN Manteswar Burdwan Division GROUND WATER SUPPLY BASED PIPED WATER SUPPLY SCHEME FOR UJNA PWSS IN MANTESHWAR BLOCK OF PURBA BARDHAMAN DISTRICT UNDER BURDWAN DIVISION PHE DTE , SM/18422 New Material Requisition To Resource Division RTOR000794/2023-2024 316/BWD 24/01/2024 0 Resource Division 47.08 0.00 0 0
4221 PURBA BARDHAMAN Manteswar Central Mechanical GROUND WATER SUPPLY BASED PIPED WATER SUPPLY SCHEME FOR UJNA PWSS IN MANTESHWAR BLOCK OF PURBA BARDHAMAN DISTRICT UNDER BURDWAN DIVISION PHE DTE , SM/18422 New New service connection charges for Ujna PWSS TW-3 BILL/02200/2023-2024 BP-2023-24-406 17/01/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 6.70 0.00 0 0
4222 PURBA BARDHAMAN Manteswar Central Mechanical GROUND WATER SUPPLY BASED PIPED WATER SUPPLY SCHEME FOR UJNA PWSS IN MANTESHWAR BLOCK OF PURBA BARDHAMAN DISTRICT UNDER BURDWAN DIVISION PHE DTE , SM/18422 New New service connection charges for Ujna PWSS TW-1 BILL/02199/2023-2024 BP-2023-24-406 17/01/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.99 0.00 0 0
4223 PURBA BARDHAMAN Manteswar Central Mechanical GROUND WATER SUPPLY BASED PIPED WATER SUPPLY SCHEME FOR UJNA PWSS IN MANTESHWAR BLOCK OF PURBA BARDHAMAN DISTRICT UNDER BURDWAN DIVISION PHE DTE , SM/18422 New ADDITIONAL QUOTATION FOR NEW SERVICE CONNECTION FOR UJNA PWSS PH-3 BILL/00187/2024-2025 BP-2024-25-88 15/05/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 0.30 0.00 0 0
4224 PURBA BARDHAMAN Manteswar Burdwan Division GROUND WATER SUPPLY BASED PIPED WATER SUPPLY SCHEME FOR UJNA PWSS IN MANTESHWAR BLOCK OF PURBA BARDHAMAN DISTRICT UNDER BURDWAN DIVISION PHE DTE , SM/18422 New Different works related (sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of different capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site) to DHENUA, IBRAMBAD & UJNA Piped Water Supply Scheme under Manteswar Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer ,JUNIOR ENGINEER DURGAPUR SUB-DIVISION PHE DTE ORD/000462/2023-2024 3456/BWD 08/08/2023 855 M/S S. CHOUDHURY 2,123.70 639.85 30.13 20
4225 PURBA BARDHAMAN Manteswar Central Mechanical GROUND WATER SUPPLY BASED PIPED WATER SUPPLY SCHEME FOR UJNA PWSS IN MANTESHWAR BLOCK OF PURBA BARDHAMAN DISTRICT UNDER BURDWAN DIVISION PHE DTE , SM/18422 New Supply and installation of Electro-Magnetic flow meter at Bazar Mahammadpur, Dhatrigram, Arjunpukur & others water supply scheme under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000590/2024-2025 3105/CMD 11/12/2024 60 SHREE BISHNU CONSTRUCTION 19.77 0.00 0 0
4226 PURBA BARDHAMAN Manteswar Central Mechanical GROUND WATER SUPPLY BASED PIPED WATER SUPPLY SCHEME FOR UJNA PWSS IN MANTESHWAR BLOCK OF PURBA BARDHAMAN DISTRICT UNDER BURDWAN DIVISION PHE DTE , SM/18422 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Sutra & others water supply scheme under Monteswar Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000068/2024-2025 2396/CMD 02/08/2024 455 SINHA ELECTRICALS 78.06 0.00 0 20
4227 PURBA BARDHAMAN Katwa-II Burdwan Division AMUL PIPED WATER SUPPLY SCHEME , SM/18458 New Material Requisition To Resource Division RTOR000209/2023-2024 2155/BWD 10/05/2023 0 Resource Division 4.61 0.00 0 0
4228 PURBA BARDHAMAN Katwa-II Burdwan Division AMUL PIPED WATER SUPPLY SCHEME , SM/18458 New Material Requisition To Resource Division RTOR000435/2023-2024 3851/BWD 01/09/2023 0 Resource Division 43.58 0.00 0 0
4229 PURBA BARDHAMAN Katwa-II Central Mechanical AMUL PIPED WATER SUPPLY SCHEME , SM/18458 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Mulgram & others water supply scheme under Katwa-II Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. ASSISTANT ENGINEER Junior Engineer ORD/000070/2024-2025 2409/CMD 02/08/2024 90 DUTTA ENTERPRISE 50.18 0.00 0 0
4230 PURBA BARDHAMAN Katwa-II Burdwan Division AMUL PIPED WATER SUPPLY SCHEME , SM/18458 New Material Requisition To Resource Division RTOR000018/2024-2025 4106/BWD 25/11/2024 0 Resource Division 14.47 0.00 0 0
4231 PURBA BARDHAMAN Katwa-II Central Mechanical AMUL PIPED WATER SUPPLY SCHEME , SM/18458 New Quotation for new service connection at Amul PWSS PH-3 BILL/00386/2024-2025 BP-2024-25-207 18/07/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.67 0.00 0 0
4232 PURBA BARDHAMAN Katwa-II Central Mechanical AMUL PIPED WATER SUPPLY SCHEME , SM/18458 New New Service connection for Amul PWSS TW-2 BILL/02348/2023-2024 BP-2023-24-465 31/01/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 2.77 0.00 0 0
4233 PURBA BARDHAMAN Katwa-II Central Mechanical AMUL PIPED WATER SUPPLY SCHEME , SM/18458 New New Service connection for Amul PWSS TW-1 BILL/02347/2023-2024 BP-2023-24-464 31/01/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 2.91 0.00 0 0
4234 PURBA BARDHAMAN Katwa-II Burdwan Division AMUL PIPED WATER SUPPLY SCHEME , SM/18458 New Different works related (sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of different capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site) to AMUL & AURIA Piped Water Supply Scheme under Katwa ¿ II Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer JUNIOR ENGINEER KATWA SUB-DIVISION PHE DTE ORD/000389/2023-2024 3198/BWD 24/07/2023 707 MANASH GHOSH 1,418.89 642.87 45.31 48
4235 PURBA BARDHAMAN Katwa-II Central Mechanical AMUL PIPED WATER SUPPLY SCHEME , SM/18458 New Hiring of Inspection Vehicle ( Diesel/CNG/LPG Driven) for supervision of JJM works under the jurisdiction of the Driller In charge, Bardhaman Mechanical Sub Division(Drilling) under CMD, PHE, Dte ,wef : 01/ 09/ 20 24 to 31/10/2024. Driller In-Charge JUNIOR ENGINEER ORD/000488/2024-2025 528/DIC/BMSD(D) 23/08/2024 61 SUBRATA BHADRA 0.81 0.74 91.36 0
4236 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting along with intake jetty protection and minor repair of WTP at Surface Water Based Piped Water Supply Scheme for Arsenic affected areas of Purbasthali-II Block , SM/08030 Retrofitting Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of Kamalnagar Surface Based Piped Water Supply Scheme at Sajiara, Simla, Barapara, Bodhsah, Dubrajpur, Gobindapur, Isabpur, Kaibati, Khord Kaibati, Kubajpur, Kuksimla, Muksimpara, Sanghoshpara, Sumuria & Chhatni (15nos) Village (Mouza) under Kalna Sub Division, PHE Dte. Assistant Engineer ORD/000016/2021-2022 3230/BWD 10/06/2021 60 UNICON INDIA 223.63 174.41 77.99 1
4237 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting along with intake jetty protection and minor repair of WTP at Surface Water Based Piped Water Supply Scheme for Arsenic affected areas of Purbasthali-II Block , SM/08030 Retrofitting Work Order for Providing Functional Household Tap Connection(FHTC) from existing distribution system within the command area of Kamalnagar Surface Based Piped Water Supply Scheme at Muragachha, Sardanga, Sihipara, Bagachra, Baragachhi, Belgachhi, Kumirpara, Lohachur, Atpara, Barea, Dhamas, Kamalapur & Kamalnagar (13nos) Village (Mouza) under Kalna Sub Division, PHE Dte. Assistant Engineer ORD/000037/2021-2022 3418/BWD 25/06/2021 60 MRITYUNJOY MUKHERJEE & CO. 232.13 289.27 124.62 1
4238 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting along with intake jetty protection and minor repair of WTP at Surface Water Based Piped Water Supply Scheme for Arsenic affected areas of Purbasthali-II Block , SM/08030 Retrofitting Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of Kamalnagar Surface Based Piped Water Supply Scheme at Majida, Rukuspur, Uttar Lakshmipur, Candipur, Gopipur, Kuturia & Mertala (7nos) Village (Mouza) under Kalna Sub Division, PHE Dte. Assistant Engineer ORD/000027/2021-2022 3393/BWD 24/06/2021 60 SATYANARAYAN ENGINEERS CO. OP. SOCIETY LTD. 219.81 305.67 139.06 1
4239 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting along with intake jetty protection and minor repair of WTP at Surface Water Based Piped Water Supply Scheme for Arsenic affected areas of Purbasthali-II Block , SM/08030 Retrofitting Supply of SS316 grade flow control valve for FHTC at Surface Water Based w/s scheme for Arsenic affected areas of Purbasthali-II block within Kalna Sub-Division under Burdwan Division, PHE Dte. (Part-A) and delivered to Barsul Divisional Store .[Part-3] Assistant Engineer ORD/000113/2021-2022 3836/BWD 23/07/2021 15 A.K. SIKDAR 17.62 35.25 200.06 1
4240 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting along with intake jetty protection and minor repair of WTP at Surface Water Based Piped Water Supply Scheme for Arsenic affected areas of Purbasthali-II Block , SM/08030 Retrofitting Work Order for Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of Kamalnagar Surface Based Piped Water Supply Scheme at Hapania, Kankhal, Khar Dattapara, Pathangram, Sontoshpur Pila & Uttar Srirampur (6nos) Village (Mouza) under Kalna Sub Division, PHE Dte. Assistant Engineer ORD/000033/2021-2022 3416/BWD 25/06/2021 60 M/S ASHA CONSTRUCTION 146.22 124.49 85.14 1
4241 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting along with intake jetty protection and minor repair of WTP at Surface Water Based Piped Water Supply Scheme for Arsenic affected areas of Purbasthali-II Block , SM/08030 Retrofitting Providing leftout water tap connection in different villages for 100% coverage to make it Sajal Gram from existing distribution system within scheme jurisdiction of different Piped Water Supply Schemes within Purbasthali ¿ II Block under Burdwan Division, PHE. Dte. Assistant Engineer ORD/000365/2021-2022 149/BWD 07/01/2022 30 G.S. CONSTRUCTION & CO. 22.15 21.59 97.47 1
4242 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting along with intake jetty protection and minor repair of WTP at Surface Water Based Piped Water Supply Scheme for Arsenic affected areas of Purbasthali-II Block , SM/08030 Retrofitting Construction of wash out & over flow & drain for drain out of over flow water by 250 mm dia UPVC pipeline & soak well along with land development at Zone-I Head work site of surface based water supply scheme within Kalna Sub-Division under Burdwan Division, PHE Dte.[SL-C] Assistant Engineer ORD/000960/2020-2021 160/KSD 19/02/2021 30 INVENT ENGINEERS CO. OPERATIVE SOCIETY LTD. 2.10 1.87 89.05 1
4243 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting along with intake jetty protection and minor repair of WTP at Surface Water Based Piped Water Supply Scheme for Arsenic affected areas of Purbasthali-II Block , SM/08030 Retrofitting Supply of SS316 grade flow control valve for FHTC at surface water based water supply scheme for Arsenic affected areas of Purbasthali-II Block within Kalna Sub-Division under Burdwan Division, PHE Dte.[Part-B] and delivered at Barsul Divisional store. Assistant Engineer ORD/000776/2021-2022 4476/BWD 03/09/2021 15 INDIA PIPE FITTING CO 17.62 17.62 100 1
4244 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting along with intake jetty protection and minor repair of WTP at Surface Water Based Piped Water Supply Scheme for Arsenic affected areas of Purbasthali-II Block , SM/08030 Retrofitting Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of Augmentation of Purbasthali Piped Water Supply Scheme at Kasthashali Village (Kasthashali habitation) (Mouza) & Purbasthali village (Purbasthali habitation), Purbasthali-II Block under Burdwan Division, PHE Dte. Assistant Engineer ORD/000316/2020-2021 1328/BWD 12/02/2021 60 INDIAN ENGINEERS CO.-OPERATIVE SOCIETY LTD. 91.41 3.02 3.3 1
4245 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting along with intake jetty protection and minor repair of WTP at Surface Water Based Piped Water Supply Scheme for Arsenic affected areas of Purbasthali-II Block , SM/08030 Retrofitting Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of Kamalnagar Surface Based Piped Water Supply Scheme at Ukhra, Dafarpota, Dampal, Mmudpur, Narayanpur, Nowapara, Patuli, Tegachhi & Gachha (9nos) Village (Mouza) under Kalna Sub Division, PHE Dte. Assistant Engineer ORD/000006/2021-2022 3122/BWD 02/06/2021 60 SK ALIM 212.45 200.97 94.6 1
4246 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting along with intake jetty protection and minor repair of WTP at Surface Water Based Piped Water Supply Scheme for Arsenic affected areas of Purbasthali-II Block , SM/08030 Retrofitting Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of Kamalnagar Surface Based Piped Water Supply Scheme at Harispur, Hatsiuri, Jajneswarpur, Jamalpur, Madhupur, Nakadaha, Nimdaha, Palasberia & Sarangpur (9nos) Village (Mouza) under Kalna Sub Division, PHE Dte. Assistant Engineer ORD/000032/2021-2022 3417/BWD 25/06/2021 60 ASHOK KUMAR GHOSH 230.37 288.10 125.06 1
4247 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting along with intake jetty protection and minor repair of WTP at Surface Water Based Piped Water Supply Scheme for Arsenic affected areas of Purbasthali-II Block , SM/08030 Retrofitting Laying of 140 mm dia HDPE Pipe from Bardangamore to Khardattapara more (Node No- 289A -289- 286) of Zone-III under Surface Based W/S Scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. (Sl No-A) Assistant Engineer ORD/000433/2021-2022 84/KSD 20/01/2022 30 UNICON INDIA 4.84 4.74 97.93 1
4248 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting along with intake jetty protection and minor repair of WTP at Surface Water Based Piped Water Supply Scheme for Arsenic affected areas of Purbasthali-II Block , SM/08030 Retrofitting Withdrawing of 110 mm dia HDPE Pipeline and relaying of 140 mm dia HDPE Pipe from Naomatha more to Bordanga more (Node No- 291 to 289-289A) under Surface Based W/S Scheme (Zone-III) within Kalna Sub-Division under Burdwan Division, PHE Dte. (Sl No-B) Assistant Engineer ORD/000434/2021-2022 87/KSD 21/01/2022 30 UNICON INDIA 4.84 4.84 100 1
4249 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting along with intake jetty protection and minor repair of WTP at Surface Water Based Piped Water Supply Scheme for Arsenic affected areas of Purbasthali-II Block , SM/08030 Retrofitting Sheet piling and others ancillary works to protect errosion of river bank protection area at raw water intake point of Kamalnagar WTP under Burdwan Division PHE Dte. Assistant Engineer ORD/000021/2022-2023 2015/BWD 18/04/2022 45 CONCORD ENGINEERING 122.20 122.20 100 1
4250 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting along with intake jetty protection and minor repair of WTP at Surface Water Based Piped Water Supply Scheme for Arsenic affected areas of Purbasthali-II Block , SM/08030 Retrofitting Relaying of different dia UPVC pipeline at damaged portion as shown by Horizon of Zone-III of surface based water supply scheme within Kalna Sub-Division under Burdwan Division, PHE Dte.[SL-B] Assistant Engineer ORD/000959/2020-2021 148/KSD 12/02/2021 30 CHANCHAL PAL 4.82 3.98 82.57 1
4251 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting along with intake jetty protection and minor repair of WTP at Surface Water Based Piped Water Supply Scheme for Arsenic affected areas of Purbasthali-II Block , SM/08030 Retrofitting Repairing and Renovation of Filter Bed, Main Boundary Gate, resetting of Paver Block Pathway, replacement of different damaged portion of doors/windows or any other structures & other related works for Kamalnagar WTP within Kalna Sub Division under Burdwan Division, P.H.E. Dte. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000894/2023-2024 5510/BWD 14/12/2023 120 GHOSH BROTHERS 47.97 26.68 55.62 5
4252 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting along with intake jetty protection and minor repair of WTP at Surface Water Based Piped Water Supply Scheme for Arsenic affected areas of Purbasthali-II Block , SM/08030 Retrofitting Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of Kamalnagar Surface Based Piped Water Supply Scheme at Biswarambha, Dhitpur, Doghori, Falea, Harishi & Moail, (6nos) Village (Mouza) under Kalna Sub Division, PHE Dte. AE(HQs) J.E. 2 BURDWAN ORD/000005/2021-2022 3121/BWD 02/06/2021 60 IJABUL SEKH 225.09 296.67 131.8 0
4253 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting along with intake jetty protection and minor repair of WTP at Surface Water Based Piped Water Supply Scheme for Arsenic affected areas of Purbasthali-II Block , SM/08030 Retrofitting Painting and renovation work of WTP Building, Boundary Wall, Truss Bridge etc. at Kamalnagar of Surface Water Based Water Supply Scheme within Kalna Sub-Divn. under Burdwan Division, PHE. Dte. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000886/2023-2024 5517/BWD 14/12/2023 30 SETH ENTERPRISE 12.63 12.00 95.01 100
4254 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting along with intake jetty protection and minor repair of WTP at Surface Water Based Piped Water Supply Scheme for Arsenic affected areas of Purbasthali-II Block , SM/08030 Retrofitting Painting & renovation work at Purbasthali raw water pumping station within Kalna Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/001122/2023-2024 4560/BWD 16/10/2023 30 CONCORD ENGINEERING 6.53 4.02 61.56 100
4255 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting along with intake jetty protection and minor repair of WTP at Surface Water Based Piped Water Supply Scheme for Arsenic affected areas of Purbasthali-II Block , SM/08030 Retrofitting Different types of works involve in connection with Augmentation of KRISHNABATI (SM/07827), PURBASTHLI (SM/07866), SINHARI (SM/09716) & SURFACE based W/S Scheme (SM/15571) Piped water supply scheme under Purbasthali-II Block, Kalna Sub-Division, PHE Dte. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000181/2024-2025 2296/BWD 20/06/2024 616 M/S DATTA ENTERPRISE 579.85 234.86 40.5 2
4256 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting along with intake jetty protection and minor repair of WTP at Surface Water Based Piped Water Supply Scheme for Arsenic affected areas of Purbasthali-II Block , SM/08030 Retrofitting Supply & Laying of 300mm Dia M.S.E.R.W Pipe including Jack Pushing along with other allied work in connection with different Augmentation & New [(SM/18439, SM/14437, SM/14435, SM/07805, SM/14440, SM/15571, SM/08030, SM/16014, SM/15588, SM/16298 & SM/16307)] under Kalna Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/001187/2024-2025 608/BWD 11/02/2025 361 MANASH GHOSH 1,209.62 0.00 0 51
4257 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Natu Piped Water Supply Scheme , SM/06972 Retrofitting Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Natu village of Natu piped water supply scheme within Headquarters under Burdwan Division, PHE Dte. [Phase-I](Tr No.-162/BWD/2020-21) ORD/000080/2020-2021 2687/BWD 07/08/2020 30 SINGHA ROY AND CO. 4.92 9.84 200 1
4258 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Natu Piped Water Supply Scheme , SM/06972 Retrofitting Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Haripur village of Natu piped water supply scheme within Headquarters under Burdwan Division, PHE Dte. [Phase-I](Tr No.-161/BWD/2020-21) ORD/000081/2020-2021 2688/BWD 07/08/2020 30 MITRA CONSTRUCTION 4.92 9.84 200 1
4259 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Natu Piped Water Supply Scheme , SM/06972 Retrofitting Continuation work order for Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Haripur village of Natu piped water supply scheme within Headquarters under Burdwan Division, PHE Dte. [Phase-I](Tr No.-278/BWD/2020-21) Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000295/2020-2021 3365/BWD 21/09/2020 30 MITRA CONSTRUCTION 4.92 9.84 200 1
4260 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Natu Piped Water Supply Scheme , SM/06972 Retrofitting Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of Natu Piped Water Supply Scheme at Notu (2 Nos Habitation Part), Horipur (4 Nos Habitation Part), Uttar Mohanpur Village (Mouza), Raina-I Block under Burdwan Division, PHE Dte.(Agreement No. 49/2020-2021 OF SE/CC/PHE. DTE.) Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000126/2020-2021 4767/BWD 01/12/2020 90 SINGHA ROY AND CO. 57.87 82.52 142.6 1
4261 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Natu Piped Water Supply Scheme , SM/06972 Retrofitting Continuation work order for Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Natu village of Natu piped water supply scheme within Headquarters under Burdwan Division, PHE Dte. [Phase-I](Tr No.-276/BWD/2020-21) Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000297/2020-2021 3363/BWD 21/09/2020 30 SINGHA ROY AND CO. 4.46 8.92 200 1
4262 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Natu Piped Water Supply Scheme , SM/06972 Retrofitting Supply of SS316 grade flow control valve for FHTC at different water supply schemes within Kalna Sub-Division under Burdwan Division, PHE Dte. and delivered at Barsul Divisional store.[Part-2] Assistant Engineer ORD/001307/2020-2021 1792 /BWD 26/02/2021 10 INDIA PIPE FITTING CO 9.70 3.13 32.27 1
4263 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Natu Piped Water Supply Scheme , SM/06972 Retrofitting Providing leftout water tap connection in different villages for 100% coverage to make it Sajal Gram from existing distribution system within scheme jurisdiction of different Piped Water Supply Schemes within Raina ¿ I Block under Burdwan Division, PHE. Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000344/2021-2022 39/BWD 05/01/2022 30 HAFIJUR RAHAMAN MIDYA 15.62 0.62 3.97 1
4264 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Natu Piped Water Supply Scheme , SM/06972 Retrofitting Extension of 75 mm dia pipeline at Miya Para, Modhya Bohar & Bhagar Para Purba Bohar regarding FHTC under Satgachia (Zone-I) water supply scheme under Burdwan Division, PHE Dte.[Gr.-A] Assistant Engineer ,Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000350/2021-2022 703/BSD 11/06/2021 5 M/S SAYAN CHAKRABORTY 0.88 0.81 92.05 1
4265 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Natu Piped Water Supply Scheme , SM/06972 Retrofitting Laying Parallel Pipeline to improve drinking water supply, Construction of Boundary wall, Path Way, Drain at Head Work Site and providing leftout FHTC, Road Restoration with allied work for NATU Piped Water Supply Scheme, Block-Raina-I within Burdwan Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000373/2024-2025 2994/BWD 01/08/2024 487 ANWESHA CONSTRUCTION 55.19 0.00 0 75
4266 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Bamunpara Piped Water Supply Scheme , SM/06962 Retrofitting Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of Bamunpara Piped Water Supply Scheme at Bamunpara (7 Nos Habitation Part), Sahajadpur (5 Nos Habitation Part), Gulita Daspara & Purba Khanpur (4 Nos Habitation) Village (Mouza), Monteswar Block under Burdwan Division, PHE Dte.(Agreement No. 69/2020-2021 OF SE/CC/PHE. DTE.) Assistant Engineer ORD/000130/2020-2021 5002/BWD 07/12/2020 90 M/S S. CHOUDHURY 50.71 84.67 166.97 1
4267 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Bamunpara Piped Water Supply Scheme , SM/06962 Retrofitting Supply of SS316 grade flow control valve for FHTC at different water supply schemes within Kalna Sub-Division under Burdwan Division, PHE Dte. and delivered at Barsul Divisional store.[Part-2] Assistant Engineer ORD/001307/2020-2021 1792 /BWD 26/02/2021 10 INDIA PIPE FITTING CO 9.70 5.47 56.39 1
4268 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Bamunpara Piped Water Supply Scheme , SM/06962 Retrofitting Providing FHTC - Sahajadpur (5 nos habitations)-170 nos & Bamunpara (7 nos habitation)-170 nos & Extension of pipeline to provide house connection at Tentulia village & Sahajadpur village for Drain out water of wash out & over flow line from existing OHR at Head Works Site of BAMUNPARA W/S Scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer ORD/000588/2021-2022 1417/BWD 10/03/2022 30 M/S UNIQUE 16.50 16.33 98.97 1
4269 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Bamunpara Piped Water Supply Scheme , SM/06962 Retrofitting Laying of UPVC pipeline & providing FHTC work at Bamunpara, Sahajadpur, Tentulia & Gulita village of BAMUNPARA Water Supply Scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000150/2023-2024 2423/BWD 30/05/2023 30 GOUTAM KUMAR MITRA 9.65 9.40 97.41 100
4270 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Putsuri Piped Water Supply Scheme , SM/06963 Retrofitting Continuation work order for Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Putsuri village of Putsuri piped water supply scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. [Phase-I](Tr No.-546/BWD/2020-21) AE(HQs) J.E. 2 BURDWAN ORD/000268/2020-2021 3532/BWD 25/09/2020 30 PRONAB KUMAR DEY 4.92 9.84 200 1
4271 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Putsuri Piped Water Supply Scheme , SM/06963 Retrofitting Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of Putsuri Piped Water Supply Scheme at Denur (6 Nos Habitation Part) & Putsuri (11 Nos Habitation Part) Village (Mouza), Monteswar Block under Burdwan Division, PHE Dte.(Agreement No. 55/2020-2021 OF SE/CC/PHE. DTE.) AE(HQs) J.E. 2 BURDWAN ORD/000125/2020-2021 4887/BWD 07/12/2020 90 M/S S. CHOUDHURY 77.12 100.09 129.78 1
4272 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Putsuri Piped Water Supply Scheme , SM/06963 Retrofitting Continuation work order for Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Denur village of Putsuri piped water supply scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. [Phase-I](Tr No.-562/BWD/2020-21) AE(HQs) J.E. 2 BURDWAN ORD/000355/2020-2021 3804/BWD 08/10/2020 30 IJABUL SEKH 4.92 9.84 200 1
4273 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Putsuri Piped Water Supply Scheme , SM/06963 Retrofitting Load Enhancement charges bill for Putsuri water supply scheme under Burdwan Division, PHE Dte.[Application No.-5003378053, Consumer Id-500684865] VCH/000392/2022-2023 300/DW/22-23 05/07/2022 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LTD. 1.56 0.00 0 0
4274 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Putsuri Piped Water Supply Scheme , SM/06963 Retrofitting Work Order for "Providing Functional house hold tap connections for Sajal Gram villages within Monteswar Block under Kalna Sub-Division under Burdwan Division, PHE Dte. (Putsuri water supply Scheme) (Sl No-9) JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000029/2023-2024 344/KSD 17/04/2023 30 HASAN CONSTRUCTION 0.88 0.00 0 0
4275 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Putsuri Piped Water Supply Scheme , SM/06963 Retrofitting Work Order for "Providing Functional house hold tap connections for Sajal Gram Village within Monteswar Block under Kalna Sub-Division under Burdwan Division, PHE Dte. (Putsuri water supply scheme)" Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000028/2023-2024 344/KSD 17/04/2023 30 HASAN CONSTRUCTION 0.88 0.00 0 0
4276 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Putsuri Piped Water Supply Scheme , SM/06963 Retrofitting Supply of 10 mm NB Gun-metal Ferrule conforming to IS: 2692-1989 for Water tap connection in each house hold from existing distribution system within Scheme jurisdiction in different Piped Water Supply Scheme within Kalna Sub-Division under Burdwan Division, PHE. Dte. and delivered at Borsul Divl. Store. [Part-5]. AE(HQs) J.E. 2 BURDWAN ORD/000090/2021-2022 3590/BWD 13/07/2021 30 PREMANANDA ROY BISWAS 127.50 14.26 11.18 1
4277 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Putsuri Piped Water Supply Scheme , SM/06963 Retrofitting Extension of 75 mm dia UPVC pipeline at different places of Denur village under Putsuri & its adjoining mouzas water supply scheme within Kalna Sub-Division under Burdwan Division, PHE Dte.[SL NO.-C] Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000839/2020-2021 169/KSD 19/02/2021 30 M/S S. CHOUDHURY 2.37 0.00 0 1
4278 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Putsuri Piped Water Supply Scheme , SM/06963 Retrofitting Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of PUTSURI Piped Water Supply Scheme at Kasa (6 Nos. Habs.), Purba Balarampur, Bhurkunda (7 Nos. Habs.), Patun (5 Nos. Habs.) & Bigha (3 Nos. Habs.) Village (Mouza), Monteswar Block under Burdwan Division, PHE Dte. Assistant Engineer ORD/000302/2021-2022 7020/BWD 17/12/2021 60 INVENT ENGINEERS CO. OPERATIVE SOCIETY LTD. 53.94 8.54 15.83 1
4279 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Putsuri Piped Water Supply Scheme , SM/06963 Retrofitting Laying of different dia.UPVC pipeline at the damaged portion from Denur to Mousa Daukadanga under Putsuri & its adjoining mouzas water supply scheme within Kalna Sub-Division, under Burdwan Division, PHE Dte. Assistant Engineer ORD/000778/2021-2022 6013/BWD 05/10/2021 30 D.M. ENTERPRISE 23.17 0.00 0 1
4280 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Putsuri Piped Water Supply Scheme , SM/06963 Retrofitting Hire & fuel charges of vehicle (Car No.-WB-04G-7127) for the office of the Assistant Engineer, Kalna Sub-Division, PHE Dte. for the month of March & April'23. BILL/00457/2023-2024 367/JJM 18/07/2023 0 PARTHA PRATIM ACHARYA 0.77 0.00 0 0
4281 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Putsuri Piped Water Supply Scheme , SM/06963 Retrofitting Hire & fuel charges of vehicle Car No.-WB-41H-3668 for the month of May & June'2023. BILL/01039/2023-2024 744/JJM 11/10/2023 0 MD HASIN 0.53 0.00 0 0
4282 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Putsuri Piped Water Supply Scheme , SM/06963 Retrofitting Providing FHTC with laying of 75 mm dia HDPE Pipe of Putsuri PWSS of near Health Centre under Manteswar Block under Durgapur Sub Division of Burdwan Division ,P.H.E.Dte Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer1, Durgapur Sub-Division, PHE Dte. ORD/001183/2023-2024 272/DSD 15/03/2024 30 SAYAK DEY 0.97 0.00 0 0
4283 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Putsuri Piped Water Supply Scheme , SM/06963 Retrofitting Relaying of different dia UPVC Pipeline at the different damage portion towards Mojaharnagar, Gulita, Denur & Putsuri of Putsuri PWSS within Kalna Sub-Division under Burdwan Division, PHE Dte. (Sl No-B) Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000322/2021-2022 985/KSD Dt- 24.09.2021 24/09/2021 30 M/S S. CHOUDHURY 3.66 3.65 99.73 100
4284 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Putsuri Piped Water Supply Scheme , SM/06963 Retrofitting Work order for "Interconnection of rising main from 4th Tube Well site to Over Head Reservoir for FHTC related water supply under Putsuri W/S Scheme within Kalna Sub-Division under Burdwan Division , PHE Dte." Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer1, Durgapur Sub-Division, PHE Dte. ORD/000554/2023-2024 1309/KSD 23/08/2023 15 PRONAB KUMAR DEY 2.10 1.78 84.76 100
4285 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Putsuri Piped Water Supply Scheme , SM/06963 Retrofitting Providing FHTC with laying of 75 mm dia HDPE Pipe of Putsuri PWSS of Ghosh para village under Manteswar Block under Durgapur Sub Division of Burdwan Division ,P.H.E.Dte Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer1, Durgapur Sub-Division, PHE Dte. ORD/001182/2023-2024 271/DSD 15/03/2024 30 SAYAK DEY 0.97 0.96 98.97 100
4286 PURBA BARDHAMAN Burdwan Division Retrofitting wroks for Providing Functional Household Tap Connection (FHTC) within the command area of of Nandai and adj.Mouzas Piped Water Supply Scheme, Block Kalna-I, District Purba Bardhaman , SM/08104 Retrofitting Continuation work order for Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Uttar Rameswarpur village of Nandai Piped Water Supply Scheme within Kalna Sub-Divn. under Burdwan Division, PHE. Dte. [Phase - I] [Sl.No : 4B] Assistant Engineer Junior Engineer, R.W.S. Burdwan Sub Division, P.H.E. Dt ORD/000035/2021-2022 3409/BWD 25/06/2021 30 AURGHA BHATTACHARYA 4.92 0.00 0 1
4287 PURBA BARDHAMAN Burdwan Division Retrofitting wroks for Providing Functional Household Tap Connection (FHTC) within the command area of of Nandai and adj.Mouzas Piped Water Supply Scheme, Block Kalna-I, District Purba Bardhaman , SM/08104 Retrofitting Supply of materials for different water supply scheme under Burdwan Division, PHE Dte. VCH/001237/2021-2022 1132/DW 26/02/2022 0 EXECUTIVE ENGINEER, RESOURCES DIVISION, P.H.E. DTE. 221.00 0.00 0 0
4288 PURBA BARDHAMAN Burdwan Division Retrofitting wroks for Providing Functional Household Tap Connection (FHTC) within the command area of of Nandai and adj.Mouzas Piped Water Supply Scheme, Block Kalna-I, District Purba Bardhaman , SM/08104 Retrofitting Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of Nandai Piped Water Supply Scheme at Nandai (Part) (7 Nos Habitation Part), Nagargachhi, Pardupra & Uttar Rameswarpur (Part) Village (Mouza), Kalna-I Block under Burdwan Division, PHE Dte. Assistant Engineer ORD/000089/2021-2022 3599/BWD 13/07/2021 60 INDIAN ENGINEERS CO.-OPERATIVE SOCIETY LTD. 110.43 107.33 97.19 1
4289 PURBA BARDHAMAN Burdwan Division Retrofitting wroks for Providing Functional Household Tap Connection (FHTC) within the command area of of Nandai and adj.Mouzas Piped Water Supply Scheme, Block Kalna-I, District Purba Bardhaman , SM/08104 Retrofitting Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of NANDAI Piped Water Supply Scheme at opposite site of railway track at Malatipur, Nagargachhi, Mirjapur, Durgapur habitations, Kalna - I Block under Burdwan Division, PHE Dte. Assistant Engineer ORD/000002/2022-2023 1869/BWD 05/04/2022 30 KOUSIK MALLICK 51.64 49.63 96.11 1
4290 PURBA BARDHAMAN Burdwan Division Retrofitting wroks for Providing Functional Household Tap Connection (FHTC) within the command area of of Nandai and adj.Mouzas Piped Water Supply Scheme, Block Kalna-I, District Purba Bardhaman , SM/08104 Retrofitting Sinking of 250 X 150mm dia Tube Well 150 mtr. Depth by D.R. Rig method using UPVC pipe (CD) and UPVC Deep Well Screen (RDS) for Aug. of BAIDYAPUR (Z-I) PWSS, Block - Kalna - II and NANDAI PWSS, Block - Kalna - I Piped Water Supply Scheme, Dist - Purba Bardhaman under Burdwan Division, PHE Dte. [For 02 Nos. Tube well]. ORD/000151/2023-2024 2424/BWD 30/05/2023 45 KOUSIK MALLICK 19.84 9.14 46.07 100
4291 PURBA BARDHAMAN Burdwan Division Retrofitting wroks for Providing Functional Household Tap Connection (FHTC) within the command area of of Nandai and adj.Mouzas Piped Water Supply Scheme, Block Kalna-I, District Purba Bardhaman , SM/08104 Retrofitting Material Requisition To Resource Division RTOR000122/2021-2022 1109/BWD 26/02/2022 0 Resource Division 67.99 0.00 0 0
4292 PURBA BARDHAMAN Burdwan Division Retrofitting wroks for Providing Functional Household Tap Connection (FHTC) within the command area of of Nandai and adj.Mouzas Piped Water Supply Scheme, Block Kalna-I, District Purba Bardhaman , SM/08104 Retrofitting Quotation for new service connection charges at Nandai PWSS [PH No.-V][Ref ID-503434397] BILL/01125/2023-2024 1086/JJM 20/12/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LTD. 9.28 0.00 0 0
4293 PURBA BARDHAMAN Burdwan Division Retrofitting wroks for Providing Functional Household Tap Connection (FHTC) within the command area of of Nandai and adj.Mouzas Piped Water Supply Scheme, Block Kalna-I, District Purba Bardhaman , SM/08104 Retrofitting Hire & fuel charges of vehicle (Car No.-WB-41J-6795) for the office of the Superintending Engineer, Central Circle, PHE Dte. for the month of January & February'23. BILL/00292/2023-2024 218/JJM 06/06/2023 0 MD HASIN 0.79 0.00 0 0
4294 PURBA BARDHAMAN Burdwan Division Retrofitting wroks for Providing Functional Household Tap Connection (FHTC) within the command area of of Nandai and adj.Mouzas Piped Water Supply Scheme, Block Kalna-I, District Purba Bardhaman , SM/08104 Retrofitting Construction of Pump House cum switch room (5.40 mtr x 3.60 mtr) with sanitary arrangement (as per drawing no. PHE/SE/CC/PH/DWG-01/2022-2023) at NANDAI Water Supply Scheme within Kalna Sub-Divn. under Burdwan Division, PHE Dte. Dist.-Purba Bardhaman. Assistant Engineer Junior Engineer, R.W.S. Burdwan Sub Division, P.H.E. Dt ORD/000806/2023-2024 4820/BWD 08/11/2023 352 SK BADIUZZAMAL 5.69 5.69 100 100
4295 PURBA BARDHAMAN Burdwan Division Retrofitting wroks for Providing Functional Household Tap Connection (FHTC) within the command area of of Nandai and adj.Mouzas Piped Water Supply Scheme, Block Kalna-I, District Purba Bardhaman , SM/08104 Retrofitting Work Order for "Laying of pipeline at gap portion of old and new pipeline of Nandai Piped Water Supply Scheme within Kalna Sub-Division under Burdwan Division , PHE Dte. " Assistant Engineer Junior Engineer, R.W.S. Burdwan Sub Division, P.H.E. Dt ORD/000947/2023-2024 1714/KSD 04/12/2023 7 ER CONSTRUCTION & GENERAL ORDER SUPPLIER 0.64 0.64 100 100
4296 PURBA BARDHAMAN Burdwan Division Retrofitting wroks for Providing Functional Household Tap Connection (FHTC) within the command area of of Nandai and adj.Mouzas Piped Water Supply Scheme, Block Kalna-I, District Purba Bardhaman , SM/08104 Retrofitting Work Order For "CONSTRUCTION OF TEMPORARY KIOSK FOR THE NECESSARY ARRANGEMENT OF ELECTRIFICATION OF TUBEWELL FOR NANDAI PWSS & SHIKARPUR PWSS UNDER KALNA SUB-DIVISION UNDER BURDWAN DIVISION, PHE DTE." Assistant Engineer Junior Engineer, R.W.S. Burdwan Sub Division, P.H.E. Dt ORD/001144/2023-2024 1980/KSD 09/02/2024 10 ER CONSTRUCTION & GENERAL ORDER SUPPLIER 0.66 0.33 50 100
4297 PURBA BARDHAMAN Burdwan Division Retrofitting wroks for Providing Functional Household Tap Connection (FHTC) within the command area of of Nandai and adj.Mouzas Piped Water Supply Scheme, Block Kalna-I, District Purba Bardhaman , SM/08104 Retrofitting Work Order for "Restoration of 350 mm dia DI Rising Main with other allied works in connection with Augmentation of Nandai (SM/08104) Piped Water Supply Scheme under Kalna Sub-Division under Burdwan Division, PHE Dte." Assistant Engineer Junior Engineer, R.W.S. Burdwan Sub Division, P.H.E. Dt ORD/001188/2023-2024 2192/KSD 15/03/2024 15 ER CONSTRUCTION & GENERAL ORDER SUPPLIER 3.30 3.14 95.15 100
4298 PURBA BARDHAMAN Burdwan Division Retrofitting wroks for Providing Functional Household Tap Connection (FHTC) within the command area of of Nandai and adj.Mouzas Piped Water Supply Scheme, Block Kalna-I, District Purba Bardhaman , SM/08104 Retrofitting Vehicle bill (Car No.-WB-04G-7127) for the month of September'2023. BILL/01680/2023-2024 1041/JJM 11/12/2023 0 PARTHA PRATIM ACHARYA 0.39 0.00 0 0
4299 PURBA BARDHAMAN Burdwan Division Retrofitting wroks for Providing Functional Household Tap Connection (FHTC) within the command area of of Nandai and adj.Mouzas Piped Water Supply Scheme, Block Kalna-I, District Purba Bardhaman , SM/08104 Retrofitting Providing FHTC in the left out portion of Natungram, Kutirdanga, Kharinan village along with other ancillary work in order to declare Sajal Gram under the command area of NANDAI PWSS (SM/08104) within Kalna Sub Division under Burdwan Division, PHE. Dte. Assistant Engineer Junior Engineer, R.W.S. Burdwan Sub Division, P.H.E. Dt ORD/000135/2025-2026 1447/BWD 22/05/2025 120 MUKHERJEE ENTERPRISE 42.77 0.00 0 0
4300 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Jageswardihi Piped Water Supply Scheme , SM/06966 Retrofitting Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Jaggeswardihi village of Jaggeswardihi Piped Water Supply Scheme within Katwa Sub-Divn. under Burdwan Division, PHE. Dte. [Phase - I] [SL. No : 9A] (T.R. No.-219/BWD/2020-21) ORD/000139/2020-2021 2630/BWD 04/08/2020 30 ABDUL HAI 4.92 0.00 0 1
4301 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Jageswardihi Piped Water Supply Scheme , SM/06966 Retrofitting Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Chaitynapur village of Jaggeswardihi piped water supply scheme within Katwa Sub-Division under Burdwan Division, PHE Dte. [Phase-I](Tr No.-204/BWD/2020-21) ORD/000089/2020-2021 2604/BWD 04/08/2020 30 SUBRATA GUPTA 4.92 9.84 200 1
4302 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Jageswardihi Piped Water Supply Scheme , SM/06966 Retrofitting Continuation work order for Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Jaggeswardihi (Part) village of Jaggeswardihi piped water supply scheme within Katwa Sub-Division under Burdwan Division, PHE Dte. [Phase-I](Tr No.-251/BWD/2020-21) AE(HQs) J.E. 2 BURDWAN ORD/000243/2020-2021 3383/BWD 22/09/2020 30 SUBRATA GUPTA 4.92 9.84 200 1
4303 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Jageswardihi Piped Water Supply Scheme , SM/06966 Retrofitting Continuation work order for Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Jaggeswardihi (Part) village of Jaggeswardihi piped water supply scheme within Katwa Sub-Division under Burdwan Division, PHE Dte. [Phase-I](Tr No.-250/BWD/2020-21) Assistant Engineer JUNIOR ENGINEER R.W.S. BURDWAN SUB-DIVISION PHE DTE ORD/000244/2020-2021 3413/BWD 22/09/2020 30 ABDUL HAI 4.92 9.84 200 1
4304 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Jageswardihi Piped Water Supply Scheme , SM/06966 Retrofitting Extension of pipeline from the existing distribution system within scheme jurisdiction at Kanaidanga under Jaggeswardihi piped water supply scheme under Mongalkote Block within Katwa Sub-Division under Burdwan Division, PHE Dte. [Phase-2] Assistant Engineer JUNIOR ENGINEER R.W.S. BURDWAN SUB-DIVISION PHE DTE ORD/000830/2020-2021 82/KTS 09/02/2021 15 HAMID SK 1.25 0.00 0 1
4305 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Jageswardihi Piped Water Supply Scheme , SM/06966 Retrofitting Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of Jageswardihi Piped Water Supply Scheme at Kaichar & Sitalgram Village (Mouza), Mongolkot Block under Burdwan Division, PHE Dte. Assistant Engineer ORD/000258/2021-2022 6694/BWD 01/12/2021 60 HAMID SK 58.77 40.93 69.64 1
4306 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Jageswardihi Piped Water Supply Scheme , SM/06966 Retrofitting Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of Jaggeswardihi Piped Water Supply Scheme at Kanaidanga & Jageswardihi (1 Part & 1 Habitation) Village (Mouza), Mangolkote Block under Burdwan Division, PHE Dte.[Agreement No. 578/BWD OF 2020-2021] AE(HQs) J.E. 2 BURDWAN ORD/000331/2020-2021 436/BWD 19/01/2021 45 KHEPIMA ENGINEERS CO. OPERATIVE SOCIETY LTD. 38.09 75.50 198.21 0
4307 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Palla Piped Water Supply Scheme , SM/06967 Retrofitting Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Palla(Pt-B) village of Palla piped water supply scheme within Burdwan Sub-Division under Burdwan Division, PHE Dte. [Phase-I](Tr No.-246/BWD/2020-21) Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000082/2020-2021 2738/BWD 10/08/2020 30 S.C. ENTERPRISE 4.92 9.84 200 1
4308 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Palla Piped Water Supply Scheme , SM/06967 Retrofitting Continuation work order for Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Palla(Pt-A) village of Palla piped water supply scheme within Burdwan Sub-Division under Burdwan Division, PHE Dte. [Phase-I](Tr No.-487/BWD/2020-21) Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000117/2020-2021 3972/BWD 14/10/2020 30 JAYANTA CHAKRABORTY 4.92 9.84 200 1
4309 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Palla Piped Water Supply Scheme , SM/06967 Retrofitting Continuation work order for Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Palla (Pt-B) village of Palla Piped Water Supply Scheme within Burdwan Sub-Divn. under Burdwan Division, PHE. Dte. [Phase - I] [GROUP : ¿11B¿] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000674/2020-2021 4912/BWD 08/12/2020 30 S.C. ENTERPRISE 4.92 9.76 198.37 1
4310 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Palla Piped Water Supply Scheme , SM/06967 Retrofitting Additional work providing Functional Household Tap connection (FHTC) from existing distribution system within the command area of Palla piped water supply scheme at Palla village (Mouza) Memari-I Block under Burdwan Division, PHE Dte. [Gr.-F] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000153/2021-2022 685/BSD 09/06/2021 30 S.C. ENTERPRISE 0.77 1.52 197.4 1
4311 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Palla Piped Water Supply Scheme , SM/06967 Retrofitting Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of PALLA Piped Water Supply Scheme at Palla(Paschim Palla Habitation Part)village(Mouza)Memari-I Block under Burdwan Division, PHE Dte.Gr.C Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000441/2021-2022 199/BSD 01/02/2022 30 MUKHERJEE ENTERPRISE 4.58 4.51 98.47 1
4312 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Palla Piped Water Supply Scheme , SM/06967 Retrofitting Providing Functional Household Tap Connection(FHTC)from existing distribution system within the command area of PALLA Water supply scheme at Palla(Paschim palla Habitation part) village (Mouza) opposite side of navigation cannel, in Memari-I Block including leftout household water tap connection(FHTC) under Burdwan Division, PHE Dte. Group : B Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000103/2022-2023 984/BSD 16/06/2022 30 DUBE ENTERPRISE 4.22 4.21 99.76 1
4313 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Palla Piped Water Supply Scheme , SM/06967 Retrofitting Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of Palla Piped Water Supply Scheme at Palla (Part) (7 Nos Habitation Part) Village (Mouza), Memari-I Block under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000023/2021-2022 3345/BWD 21/06/2021 30 M/S ASHA CONSTRUCTION 27.79 26.27 94.53 0
4314 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Palla Piped Water Supply Scheme , SM/06967 Retrofitting Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Palla(Pt-A) village of Palla piped water supply scheme within Burdwan Sub-Division under Burdwan Division, PHE Dte. [Phase-I](Tr No.-245/BWD/2020-21) Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000094/2020-2021 2746/BWD 10/08/2020 30 JAYANTA CHAKRABORTY 4.92 9.84 200 1
4315 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting at Teandul PWSS , SM/06746 Retrofitting Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of TEANDUL Piped Water Supply Scheme at Raina-I Block under Burdwan Division, PHE Dte.(Agreement No. 61/2020-2021 OF SE/CC/PHE. DTE.) Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000112/2020-2021 4881/BWD 07/12/2020 90 ASHOK KUMAR GHOSH 70.51 72.26 102.48 1
4316 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting at Teandul PWSS , SM/06746 Retrofitting Extension Pipeline with Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of Madhuban, Sultanbad, Dhamas & Teyandul of TEANDUL Piped Water Supply Scheme within Raina I Block of Burdwan Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000754/2022-2023 1228/BWD 17/03/2023 60 M/S UNIQUE 31.31 25.00 79.85 0
4317 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting at Teandul PWSS , SM/06746 Retrofitting Construction of Retaining wall for protection of soil erosion at Headwork site (Western Side) at TEANDUL Piped Water Supply Scheme under Burdwan Division, PHE Dte. [Group : B] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000035/2022-2023 241/AE/HQ 20/04/2022 30 ROY CONSTRUCTION 4.82 0.00 0 1
4318 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting at Teandul PWSS , SM/06746 Retrofitting Construction of Retaining wall for protection of soil erosion at Headwork site (southern side) at Teandul PWSS under Burdwan Division, PHE Dte. [Group: ¿H¿] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000224/2021-2022 1902/AE/HQ 16/11/2021 30 ASHOK KUMAR GHOSH 4.50 0.00 0 1
4319 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Alipur Piped Water Supply Scheme , SM/07819 Retrofitting Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of ALIPUR Piped Water Supply Scheme at Debipur, Alipur & Benapur (2 Nos Habitation) Village (Mouza), Memari-I Block under Burdwan Division, PHE Dte. [Agreement No. 92/2020-2021 OF SE/CC/PHE. DTE.] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000423/2020-2021 812/BWD 01/02/2021 90 MD HASIN 90.85 37.63 41.42 0
4320 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Alipur Piped Water Supply Scheme , SM/07819 Retrofitting Extension of UPVC and HDPE Pipe Line, Providing Left Out FHTC at south part of Debipur rail gate, Land Development & construction of PCC approach Road inside proposed boundary of H/W Site of ALIPUR & its adjacent mouza Water Supply Scheme under MEMARI-I Block of Burdwan Division, PHE Dte. Assistant Engineer,Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. Junior Engineer, RWS, Memari-I Dev. Bolck ORD/000287/2024-2025 2740/BWD 12/07/2024 171 M/S K.P. CONSTRUCTION 122.03 17.77 14.56 50
4321 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Alipur Piped Water Supply Scheme , SM/07819 Retrofitting Restoration of concrete road by Cement concrete (mix 1:1.5:3), Providing balance FHTC, parallel pipeline, drainage system, boundary wall, Bridge, land development, Sluice valve chamber for smooth water supply of FHTC work for ALIPUR PWSS and its adjoining mouzas within MEMARI-I BLOCK under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/001095/2024-2025 430/BWD 20/01/2025 287 DULAL MAJUMDER 117.26 0.00 0 30
4322 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Nabagram Piped Water Supply Scheme at Memari-I Block , SM/07798 Retrofitting Extension of pipeline for NABAGRAM Piped Water Supply Scheme at Konarpara [24 No's]Total 24 No's FHTC Work for Sajal Gram (As per Resulation taken in Special Gram Sava on 01-08-2022 within Memari-I Block including leftout husehold water tap connection (FHTC) under Burdwan Division, PHE Dte".Gr. B Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000334/2022-2023 1351/BSD 02/08/2022 5 BHARAT CONSTRUCTION 0.97 0.00 0 1
4323 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Nabagram Piped Water Supply Scheme at Memari-I Block , SM/07798 Retrofitting Extension of pipeline for NABAGRAM Piped water Supply Scheme at Kalupukur[2 Nos]Kalanabagram[5 Nos]Dadpur[8 Nos],Paschim Memari[6 Nos]Pingur[3 Nos]Chuadanga:3 Nos Total 27 Nos FHTC Work for Sajal Gram(As per Resulation taken in Special Gram Sava on 01-08-2022 within Memari-I Block including leftout household water tap connection(FHTC)under Burdwan Division,PHE Dte.Gr.C. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000335/2022-2023 1352/BSD 02/08/2022 5 BHARAT CONSTRUCTION 0.97 0.00 0 1
4324 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Nabagram Piped Water Supply Scheme at Memari-I Block , SM/07798 Retrofitting Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of Nabagram Piped Water Supply Scheme at Konar Village (2 Nos. habitations), Dadpur Village (4 Nos. habitations), Paschim Memari Village (2 Nos. habitations), Pingur Village & Nabagram Village (4 Nos. habitations), Memari - I Block under Burdwan Division, PHE Dte.[Agreement No. 681/BWD OF 2020-2021] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000311/2020-2021 1400/BWD 15/02/2021 60 UNIQUE AGENCY 68.10 133.59 196.17 1
4325 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Nabagram Piped Water Supply Scheme at Memari-I Block , SM/07798 Retrofitting Providing leftout water tap connection in different villages for 100% coverage to make it Sajal Gram from existing distribution system within scheme jurisdiction of different Piped Water Supply Schemes within Memari-I Block (Daluibazar-II, Gopegantar-I & II G.P.) under Burdwan Division, PHE. Dte. Dte._Part-A. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000371/2021-2022 209/BWD 11/01/2022 30 M/S ANAND CONSTRUCTION 21.11 0.00 0 1
4326 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Nabagram Piped Water Supply Scheme at Memari-I Block , SM/07798 Retrofitting Sinking of 150mm. dia. 100 Mtr. Deep tube well & Laying Distribution pipeline including FHTC under Jal Swapna Scheme for SWASTI PALLY Mini Piped W/S. Scheme within NABAGRAM Piped W/S. Scheme under Burdwan Division, PHE. Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000714/2022-2023 890/BWD 01/03/2023 45 BAMDEB CONSTRUCTION & CO 30.68 16.90 55.08 100
4327 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Nabagram Piped Water Supply Scheme at Memari-I Block , SM/07798 Retrofitting Extension of pipeline for NABAGRAM Piped Water Supply Scheme at Konarpara [24 No's]Total 24 No's FHTC Work for Sajal Gram (As per Resulation taken in Special Gram Sava on 01-08-2022 within Memari-I Block including leftout husehold water tap connection(FHTC) under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000645/2022-2023 1351-A/BSD 02/08/2022 5 BHARAT CONSTRUCTION 0.97 0.97 100 1
4328 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Nabagram Piped Water Supply Scheme at Memari-I Block , SM/07798 Retrofitting Extension of pipeline for NABAGRAM Piped Water Supply Scheme at Kalupukur [2 No's], Kalanabagram[5 No's] Dadpur [8 No's], Paschim Memari [6 No's], Pingur [3 No's] Chuadanga [3 No's] Total 27 No's FHTC Work for Sajal Gram (As per Resulation taken in Special Gram Sava on 01-08-2022 within Memari-I Block including leftout household water tap connection (FHTC) under Burdwan Division, PHE Dte Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000646/2022-2023 1352-A/BSD 02/08/2022 5 BHARAT CONSTRUCTION 0.97 0.97 100 1
4329 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of KHETIA Piped Water Supply Scheme , SM/07863 Retrofitting Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Khetpur Palashi (Part-A) village of Khetpur Palashi piped water supply scheme within Katwa Sub-Division under Burdwan Division, PHE Dte. (Tr No.-471/BWD/2020-21) Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000350/2020-2021 241/KTS 01/10/2020 4 CHANCHAL PAL 1.19 0.00 0 1
4330 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of KHETIA Piped Water Supply Scheme , SM/07863 Retrofitting Providing Functional Household Tap Connection (FHTC) from existing distribution system at KHETIA Pipe Water Supply Scheme of Burdwan -I Block under Burdwan Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000464/2022-2023 3963/BWD 13/09/2022 30 M/S UNIQUE 6.23 5.20 83.47 1
4331 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of KHETIA Piped Water Supply Scheme , SM/07863 Retrofitting Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of Khetia Piped Water Supply Scheme at Simdali (P) village (09 Nos. (P) habs), Burdwan-I Block under Burdwan Division, PHE Dte. [Agreement No. 749/BWD OF 2020-2021] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000441/2020-2021 1496/BWD 18/02/2021 60 H SAMANTA 52.60 18.56 35.29 1
4332 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of KHETIA Piped Water Supply Scheme , SM/07863 Retrofitting Providing Functional Household Tap Connection(FHTC)from existing distribution system at Khetia Water Supply Scheme(Habitation-Khetia,Gopalbati,Tentral)of Burdwan-I Block under Burdwan Sub-Division under Burdwan Division,PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000635/2022-2023 11/BSD 06/01/2023 15 M/S UNIQUE 0.92 0.92 100 0
4333 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of KHETIA Piped Water Supply Scheme , SM/07863 Retrofitting Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of Khetia Piped Water Supply Scheme at Gopalbati village, Khetia village (04 Nos. habs) & Tentral village Burdwan-I Block under Burdwan Division, PHE Dte. [Agreement No. 748/BWD OF 2020-2021.] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000442/2020-2021 1495/BWD 18/02/2021 45 H SAMANTA 29.16 40.09 137.48 1
4334 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of KHETIA Piped Water Supply Scheme , SM/07863 Retrofitting Designing, Making and Erection of Sign Board for SAJAL GRAM in Tentral Village, Burdwan - I Block within Khetia PWSS under Burdwan Division, PHE Dte. (5 Nos Board) AE(HQs) J.E. 1 BURDWAN ORD/000733/2023-2024 826/AE/HQ 30/10/2023 30 ISHAN CONSTRUCTION 0.76 0.72 94.74 100
4335 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of KHETIA Piped Water Supply Scheme , SM/07863 Retrofitting Designing, Making and Erection of Sign Board for SAJAL GRAM in Gopalbati Village, Burdwan - I Block within Khetia PWSS under Burdwan Division, PHE Dte. (5 Nos Board) AE(HQs) J.E. 1 BURDWAN ORD/000732/2023-2024 825/AE/HQ 30/10/2023 30 ISHAN CONSTRUCTION 0.76 0.72 94.74 100
4336 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of KHETIA Piped Water Supply Scheme , SM/07863 Retrofitting Allied work of interconnection between 2nd TW to distribution line for FHTC work for KHETIA Piped Water Supply Scheme and its adjoining mouzas within BURDWAN-I BLOCK under Burdwan Division, PHE Dte. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000132/2024-2025 1016/BSD 07/06/2024 45 ROY CONSTRUCTION 4.79 4.78 99.79 100
4337 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of KHETIA Piped Water Supply Scheme , SM/07863 Retrofitting KHETIA Piped Water Supply Scheme with Rising Main & Construction of 200 cum capacity RCC OHR with 20.0 mtr. with Staging height including soil investigation at different TW site under BARDHAMAN-I Block, District:- Purba-Bardhaman. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000874/2023-2024 5330/BWD 04/12/2023 542 THE DEVELOPER 68.62 23.12 33.69 56
4338 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of KHETIA Piped Water Supply Scheme , SM/07863 Retrofitting Providing leftout FHTC with extension of Pipeline, construction of Pathway, drain, repairing of Pump House at Head Work site with allied works for NATUNGRAM and KHETIA Piped Water Supply Scheme, Block-Burdwan-I, within Burdwan Sub Division under Burdwan Division PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JE (RWS) Burdwan-I Block ORD/001003/2024-2025 007/BWD 02/01/2025 211 M/S UNIQUE 33.59 0.00 0 80
4339 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of BALGANA Piped Water Supply Scheme at Bhatar Block , SM/07871 Retrofitting Continuation work order for Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Balgona village and Balgona Habitation of Balgona piped water supply scheme within Durgapur (Bardhaman North) Sub-Division under Burdwan Division, PHE Dte. [Phase-I] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000635/2020-2021 4333/BWD 05/11/2020 30 S.S. CONSTRUCTION 4.86 0.00 0 1
4340 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of BALGANA Piped Water Supply Scheme at Bhatar Block , SM/07871 Retrofitting Continuation work order for Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Haripur village and Haripur habitation of Balgona piped water supply scheme within Durgapur (Bardhaman North) Sub-Division under Burdwan Division, PHE Dte. [Phase-I] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000697/2020-2021 4334/BWD 05/11/2020 30 S.S. CONSTRUCTION 4.03 0.00 0 1
4341 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of BALGANA Piped Water Supply Scheme at Bhatar Block , SM/07871 Retrofitting Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Balgona village and Balgona habitation of Balgona piped water supply scheme within Durgapur (Bardhaman North) Sub-Division under Burdwan Division, PHE Dte. [Phase-I] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000698/2020-2021 3347/BWD 18/09/2020 30 S.S. CONSTRUCTION 4.86 0.00 0 1
4342 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of BALGANA Piped Water Supply Scheme at Bhatar Block , SM/07871 Retrofitting Sinking of additional 250 X 150mm dia Tube Well 150 mtr. Depth by D.R. Rig method using UPVC pipe (CD) and UPVC Deep Well Screen (RDS) for BALGONA Piped Water Supply Scheme, Block - Bhatar, Dist - Purba Bardhaman under Burdwan Division, PHE Dte. Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000066/2022-2023 2389/BWD 10/05/2022 30 ANIRUDDHA FARUQUE 9.03 8.05 89.15 1
4343 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of BALGANA Piped Water Supply Scheme at Bhatar Block , SM/07871 Retrofitting Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of Balgona Piped Water Supply Scheme at Balgona village (Balgona (P), Patna habs), Bhatar Block under Burdwan Division, PHE Dte. Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000335/2020-2021 1574/BWD 22/02/2021 60 M/S S. CHOUDHURY 63.94 32.40 50.67 1
4344 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of BALGANA Piped Water Supply Scheme at Bhatar Block , SM/07871 Retrofitting Laying of additional pipeline to facilitate FHTC at Patna village of Bolgona and its adjoining mouza's Piped W/S Scheme at Bhatar Block within Durgapur Sub Division under Burdwan Division, P.H.E. Dte. [SL-11] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer, R.W.S. Burdwan Sub Division, P.H.E. Dt ORD/000854/2022-2023 711/DSD 30/12/2022 30 NANGTASWAR CO. OP. LABOUR CONT. AND CONSTRUCTION SOCIETY LTD. 4.09 0.00 0 0
4345 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of BALGANA Piped Water Supply Scheme at Bhatar Block , SM/07871 Retrofitting Extension of pipeline at Patna village of Bolgona and its adjoining mouza's Piped W/S Scheme at Bhatar Block within Durgapur Sub Division under Burdwan Division, P.H.E. Dte. [SL-10] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer, R.W.S. Burdwan Sub Division, P.H.E. Dt ORD/000853/2022-2023 710/DSD 30/12/2022 30 NANGTASWAR CO. OP. LABOUR CONT. AND CONSTRUCTION SOCIETY LTD. 4.65 0.00 0 0
4346 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of BALGANA Piped Water Supply Scheme at Bhatar Block , SM/07871 Retrofitting Surging of existing Tube Well at Headwork site for Bolgona Water Supply Scheme , Block - Bhatar, Dist - Purba Barddhaman under Durgapur Sub Division, PHE Dte.[SL-C] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000623/2021-2022 164/DSD 16/03/2022 5 J. K. CORPORATION 0.54 0.00 0 1
4347 PURBA BARDHAMAN Central Drilling Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of BALGANA Piped Water Supply Scheme at Bhatar Block , SM/07871 Retrofitting Providing Drilling crew and other allied works for construction of Tube well (300mm x 200mm x 120 mtrs. Depth) by utilising Departmental machineries for Balgana W/S Scheme, Bhatar block under Purba Burdwan District, CDD PHE Dte. Driller In Charge Junior Engineer ORD/000010/2023-2024 63/CDD 06/04/2023 30 C.M. ENTERPRISE 9.91 7.52 75.88 100
4348 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of BALGANA Piped Water Supply Scheme at Bhatar Block , SM/07871 Retrofitting WBSEDCL quotation of Balgona piped water supply scheme under Burdwan Division, PHE Dte. [Ref. ID-503447092] BILL/00612/2023-2024 713/JJM 05/10/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LTD. 4.68 0.00 0 0
4349 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of BALGANA Piped Water Supply Scheme at Bhatar Block , SM/07871 Retrofitting Placing of pipeline at "Patna and adj" villages of Balgona and its adjoining mouza's Piped W/S Scheme at Bhatar Block within Durgapur Sub Division under Burdwan Division, P.H.E. Dte. [SL-A] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000120/2022-2023 333/DSD 27/06/2022 15 R.K. ENTERPRISE 1.11 0.00 0 0
4350 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of BALGANA Piped Water Supply Scheme at Bhatar Block , SM/07871 Retrofitting Providing Functional Household Tap Connection (FHTC) by sinking of tube well 250 x 150 mm. dia. (2 Nos.) Constn. of Pump House, Boundary Wall and Land Development within command area of BALGANA & BHATAKUL W/S. Scheme, Bhatar Block under Burdwan Division, PHE. Dte. Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/001188/2024-2025 596/BWD 07/02/2025 120 M/S S.S. ENTERPRISE 114.01 0.00 0 0
4351 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of BALGANA Piped Water Supply Scheme at Bhatar Block , SM/07871 Retrofitting Laying of Rising main in between Tube Well and Distribution Line for PUMP HOUSE 3 (RAIL LINE er dhar ) under BOLGONA PWSS in BHATAR Block under Durgapur Sub-Division under Burdwan Division, P.H.E. Dte. ORD/000523/2025-2026 1019/DSD 10/07/2025 15 S.S. CONSTRUCTION 0.82 0.00 0 0
4352 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Kanshra Piped Water Supply Scheme at Jamalpur Block , SM/07816 Retrofitting Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of KANSHRA Piped Water Supply Scheme at Bishnubati (Harekrishnapur Habitation), Jotsubal (Jotsubalpaharpur & Sagar Habitation) Village (Mouza), Jamalpur Block under Burdwan Division, PHE Dte. (Agreement no. 594/BWD of 2020-2021) AE(HQs) ORD/000330/2020-2021 619/BWD 25/01/2021 60 ROY CONSTRUCTION 20.42 0.00 0 1
4353 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Kanshra Piped Water Supply Scheme at Jamalpur Block , SM/07816 Retrofitting Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of KANSHRA Piped Water Supply Scheme at Jotkrishtai (Jotkestai Habitation), Kalna (Jotkalna Habitation) & Kanshra (Bhabanipur Habitation) Village (Mouza), Jamalpur Block under Burdwan Division, PHE Dte.(Agreement no. 571/BWD of 2020-2021) AE(HQs) ORD/000332/2020-2021 441/BWD 19/01/2021 60 GENUINE ENGINEERING CO-OP. SOCIETY LTD. 19.48 0.00 0 1
4354 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Kanshra Piped Water Supply Scheme at Jamalpur Block , SM/07816 Retrofitting Laying of UPVC Pipeline for providing FHTC at Kanshra Mouza (Habitation) under KANSHRA Piped Water Supply Scheme, Jamalpur Development Block under Burdwan Division, PHE Dte. AE(HQs) ORD/000067/2023-2024 2018/BWD 28/04/2023 30 TARAMA AGENCY 12.58 12.56 99.84 0
4355 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Kanshra Piped Water Supply Scheme at Jamalpur Block , SM/07816 Retrofitting Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of KANSHRA Piped Water Supply Scheme at Kalna (Kalnagram & Surakalna Habitation) Village (Mouza), Jamalpur Block under Burdwan Division, PHE Dte. [Agreement No. 639/BWD OF 2020-2021] AE(HQs) ORD/000433/2020-2021 989/BWD 04/02/2021 60 IJABUL SEKH 22.09 21.45 97.1 1
4356 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Kanshra Piped Water Supply Scheme at Jamalpur Block , SM/07816 Retrofitting Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of KANSHRA Piped Water Supply Scheme at Kanshra (Jorbandh & Kanshra Habitation) Village (Mouza), Jamalpur Block under Burdwan Division, PHE Dte.[Agreement No. 625/BWD OF 2020-2021] AE(HQs) ORD/000438/2020-2021 957/BWD 03/02/2021 60 DEBASHISH ENTERPRISE 21.87 21.76 99.5 1
4357 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Kanshra Piped Water Supply Scheme at Jamalpur Block , SM/07816 Retrofitting Laying of uPVC pipe for providing FHTC at Jorbandh habitation of Kanshra Mouza within Kanshra Piped Water Supply Scheme, Jamalpur Block under Burdwan Division P.H.E DTE. [Group: ¿C¿] AE(HQs) ORD/000226/2021-2022 1898/AE/HQ 16/11/2021 30 M/S ANAND CONSTRUCTION 4.62 4.62 100 1
4358 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Kanshra Piped Water Supply Scheme at Jamalpur Block , SM/07816 Retrofitting Providing Functional Household Tap Connection (FHTC) at Kalna village within the command area of Kanshra Piped Water Supply Scheme at Jamalpur Block under Burdwan Division, PHE Dte. [Group : C] AE(HQs) ORD/000460/2021-2022 68/AE/HQ 11/02/2022 30 MAA BHABANI CONSTRUCTION 4.81 4.81 100 1
4359 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Kanshra Piped Water Supply Scheme at Jamalpur Block , SM/07816 Retrofitting Extension of pipeline for providing functional house hold tap connection at Jotsubal village within Kanshra water supply scheme under Burdwan Division, PHE Dte. [Gr.-A] AE(HQs) ORD/000866/2020-2021 1256/AE/HQ 15/02/2021 30 ROY CONSTRUCTION 4.84 0.00 0 1
4360 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Kanshra Piped Water Supply Scheme at Jamalpur Block , SM/07816 Retrofitting Laying of uPVC pipe for providing FHTC at Kanshra Village within KANSHRA Piped Water Supply Scheme, Jamalpur Block under Burdwan Division P.H.E Dte. [Group : A] AE(HQs) ORD/000045/2022-2023 199/AE/HQ 06/04/2022 30 DEBASHISH ENTERPRISE 4.84 4.84 100 1
4361 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Kanshra Piped Water Supply Scheme at Jamalpur Block , SM/07816 Retrofitting Laying of 90 mm dia UPVC pipe for providing FHTC at Surekalna habitation of Kalna Mouza within Kanshra piped water supply scheme, at Jamalpur Block under Burdwan Division, PHE Dte.[Gr.-D] AE(HQs) ORD/000752/2021-2022 1899/AE/HQ 16/11/2021 30 SWASTIK ENTERPRISE 4.75 4.58 96.42 1
4362 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Kanshra Piped Water Supply Scheme at Jamalpur Block , SM/07816 Retrofitting Laying of 75 mm and 50 mm dia UPVC pipe for providing FHTC at Kalnagram habitation of Kalna Mouza within Kanshra piped water supply scheme within Jamalpur Block under Burdwan Division, PHE Dte.[Gr.-C] AE(HQs) ORD/000769/2021-2022 1857/AE/HQ 05/10/2021 30 SANJAY SK 3.50 2.73 78 1
4363 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Kanshra Piped Water Supply Scheme at Jamalpur Block , SM/07816 Retrofitting Providing Functional Household Tap Connection (FHTC) at Paharpur & Chikonhati village within the command area of KANSHRA Piped Water Supply Scheme at Jamalpur Block under Burdwan Division, PHE Dte. GROUP : B AE(HQs) ORD/000228/2022-2023 425/AE/HQ 03/08/2022 30 OM ENTERPRISE 4.10 4.10 100 1
4364 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Kanshra Piped Water Supply Scheme at Jamalpur Block , SM/07816 Retrofitting Interconnection between inlet & delivery pipe with main distribution pipeline within command area of KANSHRA Piped W/S. Scheme, Jamalpur Block under Burdwan Division, PHE. Dte. AE(HQs) J.E. 2 BURDWAN ORD/000826/2022-2023 214/AE/HQ 31/03/2023 30 OM ENTERPRISE 0.87 0.83 95.4 100
4365 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Kanshra Piped Water Supply Scheme at Jamalpur Block , SM/07816 Retrofitting Extension of pipeline for KANSHRA Piped Water Supply Scheme at Badalpur Habitation in Jamalpur Block under Burdwan Division, PHE Dte. AE(HQs) J.E. 2 BURDWAN ORD/000828/2022-2023 216/AE/HQ 31/03/2023 30 DEBASHISH ENTERPRISE 0.95 0.95 100 100
4366 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Kanshra Piped Water Supply Scheme at Jamalpur Block , SM/07816 Retrofitting Construction of sluice valve chamber & supply of sluice valve for extension of pipeline for KANSHRA Piped W/S. Scheme, Jamalpur Block under Burdwan Division, PHE. Dte. AE(HQs) J.E. 2 BURDWAN ORD/000829/2022-2023 217/AE/HQ 31/03/2023 30 DEBASHISH ENTERPRISE 0.92 0.92 100 100
4367 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Kanshra Piped Water Supply Scheme at Jamalpur Block , SM/07816 Retrofitting Extension of pipeline for KANSHRA Piped Water Supply Scheme at Natungram Habitation in Jamalpur Block under Burdwan Division, PHE Dte. AE(HQs) J.E. 2 BURDWAN ORD/000827/2022-2023 215/AE/HQ 31/03/2023 30 DEBASHISH ENTERPRISE 0.95 0.95 100 100
4368 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Kanshra Piped Water Supply Scheme at Jamalpur Block , SM/07816 Retrofitting Extension of pipeline for KANSHRA Piped Water Supply Scheme at Badalpur & Natungram (Habitation) in Jamalpur Development Block for providing water tap connection (FHTC) under Burdwan Division, PHE Dte. AE(HQs) J.E. 2 BURDWAN ORD/000406/2023-2024 421/AE/HQ 02/08/2023 30 DEBASHISH ENTERPRISE 0.95 0.95 100 100
4369 PURBA BARDHAMAN Burdwan Division Augmentation of SINHARI PWSS for providing functional household tap conncetion FHTC in Purbasthali-II block under Burdwan Division in Purba Bardhaman District , SM/09410 Augmentation Sinking of additional 250 X 150mm dia Tube Well 150 mtr. Depth by D.R. Rig method using UPVC pipe (CD) and UPVC Deep Well Screen (RDS) for SINHARI Piped Water Supply Scheme, Block - Purbasthali - II, Dist - Purba Bardhaman under Burdwan Division, PHE Dte. Assistant Engineer ORD/000071/2022-2023 2425/BWD 11/05/2022 30 M/S SYCHROTECH INDUSTRY 9.01 0.00 0 0
4370 PURBA BARDHAMAN Burdwan Division Augmentation of SINHARI PWSS for providing functional household tap conncetion FHTC in Purbasthali-II block under Burdwan Division in Purba Bardhaman District , SM/09410 Augmentation Preparation of DPR for augmentation of Sinhari W/S Scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. (Sl No-C) Assistant Engineer ORD/000581/2021-2022 215/KSD 24/02/2022 21 LEMNISCATE 2.92 2.86 97.95 1
4371 PURBA BARDHAMAN Burdwan Division Augmentation of SINHARI PWSS for providing functional household tap conncetion FHTC in Purbasthali-II block under Burdwan Division in Purba Bardhaman District , SM/09410 Augmentation Supply of materials for different water supply scheme under Burdwan Division, PHE Dte. VCH/001578/2021-2022 1207/DW 10/03/2022 0 EXECUTIVE ENGINEER, RESOURCES DIVISION, P.H.E. DTE. 3,005.00 0.00 0 0
4372 PURBA BARDHAMAN Central Mechanical Augmentation of SINHARI PWSS for providing functional household tap conncetion FHTC in Purbasthali-II block under Burdwan Division in Purba Bardhaman District , SM/09410 Augmentation Supply & Installation of Submersible Pumping Machinery , Voltage Stabilizer, Chlorination system and internal House wiring for Tube well no.- 1,2 &3 at Augumentation of Sinhari Water Supply Scheme under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000078/2023-2024 2574/CMD 06/06/2023 30 P.K. ENGINEERING 33.08 0.00 0 0
4373 PURBA BARDHAMAN Burdwan Division Augmentation of SINHARI PWSS for providing functional household tap conncetion FHTC in Purbasthali-II block under Burdwan Division in Purba Bardhaman District , SM/09410 Augmentation Material Requisition To Resource Division RTOR000039/2021-2022 539/BWD 27/01/2022 0 Resource Division 16.89 0.00 0 0
4374 PURBA BARDHAMAN Burdwan Division Augmentation of SINHARI PWSS for providing functional household tap conncetion FHTC in Purbasthali-II block under Burdwan Division in Purba Bardhaman District , SM/09410 Augmentation Material Requisition To Resource Division RTOR000161/2021-2022 1321/BWD 08/03/2022 0 Resource Division 44.30 0.00 0 0
4375 PURBA BARDHAMAN Burdwan Division Augmentation of SINHARI PWSS for providing functional household tap conncetion FHTC in Purbasthali-II block under Burdwan Division in Purba Bardhaman District , SM/09410 Augmentation Material Requisition To Resource Division RTOR000213/2021-2022 1536/BWD 15/03/2022 0 Resource Division 0.37 0.00 0 0
4376 PURBA BARDHAMAN Burdwan Division Augmentation of SINHARI PWSS for providing functional household tap conncetion FHTC in Purbasthali-II block under Burdwan Division in Purba Bardhaman District , SM/09410 Augmentation Material Requisition To Resource Division RTOR000153/2021-2022 1241/BWD 07/03/2022 0 Resource Division 4.19 0.00 0 0
4377 PURBA BARDHAMAN Burdwan Division Augmentation of SINHARI PWSS for providing functional household tap conncetion FHTC in Purbasthali-II block under Burdwan Division in Purba Bardhaman District , SM/09410 Augmentation Augmentation of SINHARI Piped Water Supply Scheme with LDS, FHTC, Rising Main, Construction of 350 Cum capacity OHR with 20.0 Mtr. Staging height inclusive of soil investigation including construction of switch room (3.60mx3.0m) for new TW site under Purbasthali II Block, District - Purba Bardhaman. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000010/2022-2023 1940/BWD 11/04/2022 365 CONCORD ENGINEERING 441.10 292.72 66.36 60
4378 PURBA BARDHAMAN Burdwan Division Augmentation of SINHARI PWSS for providing functional household tap conncetion FHTC in Purbasthali-II block under Burdwan Division in Purba Bardhaman District , SM/09410 Augmentation Different types of works involve in connection with Augmentation of KRISHNABATI (SM/07827), PURBASTHLI (SM/07866), SINHARI (SM/09716) & SURFACE based W/S Scheme (SM/15571) Piped water supply scheme under Purbasthali-II Block, Kalna Sub-Division, PHE Dte. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000181/2024-2025 2296/BWD 20/06/2024 616 M/S DATTA ENTERPRISE 579.85 40.37 6.96 2
4379 PURBA BARDHAMAN Burdwan Division Augmentation of SINHARI PWSS for providing functional household tap conncetion FHTC in Purbasthali-II block under Burdwan Division in Purba Bardhaman District , SM/09410 Augmentation Construction of 350cum OHR & Other Allied Works in connection with Augmentation of (SM/07803), (SM/09410), (SM/16304), (SM/15172) & (SM/14020) Piped Water Supply Scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/001048/2024-2025 220/BWD 10/01/2025 270 R.K. MANDAL& CO. 491.79 0.00 0 1
4380 PURBA BARDHAMAN Burdwan Division Providing Functional House hold Tap Connection (FHTC) by retrofitting at Dogachia mouza within the command area of Amra piped Water Supply Scheme at Jamalpur Block under Burdwan Division, P.H.E. DTE. (Pt.-B) , SM/08702 Retrofitting Laying of 100 mm dia D.I Pipe for Road widening from 4 lane to 6 lane of NH2 at chainage 596+286 & 596+086 & 596+ 486 at Amra Water supply within Jamalpur Block,under Burdwan Division,PHE Dte". Group : A. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000101/2022-2023 982/BSD 16/06/2022 30 DEY NIRMAN 2.89 0.00 0 0
4381 PURBA BARDHAMAN Burdwan Division Providing Functional House hold Tap Connection (FHTC) by retrofitting at Dogachia mouza within the command area of Amra piped Water Supply Scheme at Jamalpur Block under Burdwan Division, P.H.E. DTE. (Pt.-B) , SM/08702 Retrofitting Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of Amra Piped Water Supply Scheme at Amra (2 Nos Habitation Part) & Dogachia Village (Mouza), Jamalpur Block under Burdwan Division, PHE Dte._3rd CALL. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000008/2021-2022 3138/BWD 03/06/2021 45 D.M. ENTERPRISE 57.42 28.82 50.19 1
4382 PURBA BARDHAMAN Burdwan Division Providing Functional House hold Tap Connection (FHTC) by retrofitting at Dogachia mouza within the command area of Amra piped Water Supply Scheme at Jamalpur Block under Burdwan Division, P.H.E. DTE. (Pt.-B) , SM/08702 Retrofitting Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of AMRA Piped Water Supply Scheme (Vill-Dogechia, Habitation- Dogechia ) at Jamalpur Block of Burdwan Sub-Division under Burdwan Division, PHE Dte.Gr.A. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000386/2021-2022 57/BSD 13/01/2022 30 DEY NIRMAN 4.81 0.00 0 1
4383 PURBA BARDHAMAN Burdwan Division Providing Functional House hold Tap Connection (FHTC) by retrofitting at Dogachia mouza within the command area of Amra piped Water Supply Scheme at Jamalpur Block under Burdwan Division, P.H.E. DTE. (Pt.-B) , SM/08702 Retrofitting Extension of pipeline at AMRA water supply scheme at different villages (Tengaberia, Badpur & Kolupukur) FHTC of Jamalpur Block under Burdwan Division, PHE Dte.[Gr.-F] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000561/2021-2022 1374/BSD 05/10/2021 30 D.M. ENTERPRISE 4.74 3.81 80.38 1
4384 PURBA BARDHAMAN Burdwan Division Providing Functional House hold Tap Connection (FHTC) by retrofitting at Dogachia mouza within the command area of Amra piped Water Supply Scheme at Jamalpur Block under Burdwan Division, P.H.E. DTE. (Pt.-B) , SM/08702 Retrofitting Construction of Boundary wall at 3rd Tube well site of Dogachia Mouza of Amra water supply scheme under Jamalpur block under Burdwan Division, PHE Dte. [Length-59 Mtr][Gr.-F] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000557/2021-2022 1028/BSD 05/08/2021 45 MUKHERJEE ENTERPRISE 4.45 0.00 0 1
4385 PURBA BARDHAMAN Burdwan Division Providing Functional House hold Tap Connection (FHTC) by retrofitting at Dogachia mouza within the command area of Amra piped Water Supply Scheme at Jamalpur Block under Burdwan Division, P.H.E. DTE. (Pt.-B) , SM/08702 Retrofitting Construction of concrete road and rest portion of boundary wall at Head works site of AMRA Piped Water Supply Scheme in Jamalpur Block under Burdwan Division, PHE Dte. (Length - 122 Mtr., 45 Nos Column). Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. Junior Engineer, R.W.S. Burdwan Sub Division, P.H.E. Dt ORD/000146/2022-2023 3100/BWD 14/07/2022 30 CHAUDHURI ENTERPRISE 7.68 7.74 100.78 0
4386 PURBA BARDHAMAN Burdwan Division Providing Functional House hold Tap Connection (FHTC) by retrofitting at Dogachia mouza within the command area of Amra piped Water Supply Scheme at Jamalpur Block under Burdwan Division, P.H.E. DTE. (Pt.-B) , SM/08702 Retrofitting Repairing and replace of damaged UPVC Pipeline with installation and construction of valve chamber for control of water flow within command area of AMRA Piped W/S Scheme at Dogachia habitation,Jamalpur Development Block under Burdwan Division,PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. RWS_JAMALPUR ORD/000806/2022-2023 429/BSD 15/03/2023 30 DEY NIRMAN 0.89 0.87 97.75 100
4387 PURBA BARDHAMAN Burdwan Division Providing Functional House hold Tap Connection (FHTC) by retrofitting at Dogachia mouza within the command area of Amra piped Water Supply Scheme at Jamalpur Block under Burdwan Division, P.H.E. DTE. (Pt.-B) , SM/08702 Retrofitting Providing FHTC for Dogachia Mouza [(Habitation (Village)] for AMRA piped W/S Scheme, Jamalpur Dev. Block under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000068/2023-2024 2019/BWD 28/04/2023 30 DEY NIRMAN 20.61 18.00 87.34 100
4388 PURBA BARDHAMAN Burdwan Division Augmentation of ground water based MAJHIGRAM SINGOT PWSS to accommodate FHTC in Mangolkote block under Katwa Sub Division of Burdwan Division in Purba Bardhaman District , SM/09569 Augmentation Route Survey and preparation of DPR for MAJHIGRAM-SINGHOT PWSS under Mongalkote Block under Katwa Sub-Division under Burdwan Division PHE Dte. [Sl No-05] Assistant Engineer ORD/000546/2021-2022 56/KTS 25/01/2022 21 RADIANT 2.63 2.63 100 1
4389 PURBA BARDHAMAN Burdwan Division Augmentation of ground water based MAJHIGRAM SINGOT PWSS to accommodate FHTC in Mangolkote block under Katwa Sub Division of Burdwan Division in Purba Bardhaman District , SM/09569 Augmentation Supply of materials for different water supply scheme under Burdwan Division, PHE Dte. VCH/001578/2021-2022 1207/DW 10/03/2022 0 EXECUTIVE ENGINEER, RESOURCES DIVISION, P.H.E. DTE. 3,005.00 0.00 0 0
4390 PURBA BARDHAMAN Burdwan Division Augmentation of ground water based MAJHIGRAM SINGOT PWSS to accommodate FHTC in Mangolkote block under Katwa Sub Division of Burdwan Division in Purba Bardhaman District , SM/09569 Augmentation Construction of Pump House cum chlorine room without sanitary and water supply arrangement at Head Work Site to departmental drawing (Size 3.60 mtr x 3.00 mtr room) for MAJHIGRAM SINGOT water supply schemes under Katwa Sub-Division within Burdwan Division, PHE Dte. [ G.L to P.L Height= 1.20 Mtr] (Sl No-1) Assistant Engineer ORD/000273/2021-2022 798/KTS 10/12/2021 60 BABUL SK 3.24 2.91 89.81 1
4391 PURBA BARDHAMAN Burdwan Division Augmentation of ground water based MAJHIGRAM SINGOT PWSS to accommodate FHTC in Mangolkote block under Katwa Sub Division of Burdwan Division in Purba Bardhaman District , SM/09569 Augmentation Construction of sanitary Latrine and water supply arrangement at Head Work Site of Majhigram Singot piped water supply schemes under Mongalkote Block under Katwa Sub-Division under Burdwan Division, PHE Dte.[Sl No-01] Assistant Engineer ORD/000593/2021-2022 159/KTS 24/02/2022 21 BABUL SK 1.76 1.72 97.73 1
4392 PURBA BARDHAMAN Central Mechanical Augmentation of ground water based MAJHIGRAM SINGOT PWSS to accommodate FHTC in Mangolkote block under Katwa Sub Division of Burdwan Division in Purba Bardhaman District , SM/09569 Augmentation Supply , delivery & Installation of Submersible Pumping Machinery , Voltage stabiliser , Chlorinator and Internal House wiring for Tube well No. 3 of Majhigram Water Supply Scheme under CMD, PHE Dte., Dist.- Purba-Bardhaman. [ Block- Mongalkoat ] ASSISTANT ENGINEER ORD/000013/2022-2023 1173/CMD 27/06/2022 30 MITRA ENTERPRISE 9.22 9.03 97.94 1
4393 PURBA BARDHAMAN Burdwan Division Augmentation of ground water based MAJHIGRAM SINGOT PWSS to accommodate FHTC in Mangolkote block under Katwa Sub Division of Burdwan Division in Purba Bardhaman District , SM/09569 Augmentation Material Requisition To Resource Division RTOR000163/2021-2022 1323/BWD 08/03/2022 0 Resource Division 16.00 0.00 0 0
4394 PURBA BARDHAMAN Burdwan Division Augmentation of ground water based MAJHIGRAM SINGOT PWSS to accommodate FHTC in Mangolkote block under Katwa Sub Division of Burdwan Division in Purba Bardhaman District , SM/09569 Augmentation Material Requisition To Resource Division RTOR000059/2021-2022 545/BWD 27/01/2022 0 Resource Division 16.58 0.00 0 0
4395 PURBA BARDHAMAN Burdwan Division Augmentation of ground water based MAJHIGRAM SINGOT PWSS to accommodate FHTC in Mangolkote block under Katwa Sub Division of Burdwan Division in Purba Bardhaman District , SM/09569 Augmentation Material Requisition To Resource Division RTOR000219/2021-2022 1553/BWD 15/03/2022 0 Resource Division 0.37 0.00 0 0
4396 PURBA BARDHAMAN Burdwan Division Augmentation of ground water based MAJHIGRAM SINGOT PWSS to accommodate FHTC in Mangolkote block under Katwa Sub Division of Burdwan Division in Purba Bardhaman District , SM/09569 Augmentation Material Requisition To Resource Division RTOR000181/2021-2022 1376/BWD 09/03/2022 0 Resource Division 3.83 0.00 0 0
4397 PURBA BARDHAMAN Burdwan Division Augmentation of ground water based MAJHIGRAM SINGOT PWSS to accommodate FHTC in Mangolkote block under Katwa Sub Division of Burdwan Division in Purba Bardhaman District , SM/09569 Augmentation Material Requisition To Resource Division RTOR000016/2022-2023 3275/BWD 29/07/2022 0 Resource Division 34.57 0.00 0 0
4398 PURBA BARDHAMAN Burdwan Division Augmentation of ground water based MAJHIGRAM SINGOT PWSS to accommodate FHTC in Mangolkote block under Katwa Sub Division of Burdwan Division in Purba Bardhaman District , SM/09569 Augmentation Augmentation of MAJHIGRAM SINGOT Piped Water Supply Scheme with LDS, FHTC, Rising Main, Construction of 400 Cum capacity OHR with 20.0 Mtr. Staging height inclusive of soil investigation including repair of pump house at head works & 2ND TW site under Mangalkote Block, District - Purba Bardhaman. Assistant Engineer JE, Katwa Sub-Division,JUNIOR ENGINEER KATWA SUB-DIVISION PHE DTE,Junior Engineer2, Durgapur Sub-Division, PHE Dte. ORD/000009/2022-2023 1939/BWD 11/04/2022 365 INDIAN ENGINEERS CO.-OPERATIVE SOCIETY LTD. 369.39 319.75 86.56 85
4399 PURBA BARDHAMAN Burdwan Division Providing Functional House hold Tap Connection (FHTC) by retrofitting at Hatbela and Hridaypur mouza within the command area of Sultanpur piped Water Supply Scheme at Kalna-I Block under Burdwan Division, P.H.E. DTE. (Pt.-B) , SM/08700 Retrofitting Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of Sultanpur Piped Water Supply Scheme at Halbele, Hridaypur, Isabpur, Nowapara & Uplati Village (Mouza), Kalna ¿ I Block under Burdwan Division, PHE Dte.(Agreement No. 56/2020-2021 OF SE/CC/PHE. DTE.) Assistant Engineer ORD/000124/2020-2021 4901/BWD 07/12/2020 90 MAJILA ENTERPRISE 94.67 6.47 6.83 1
4400 PURBA BARDHAMAN Burdwan Division Providing Functional House hold Tap Connection (FHTC) by retrofitting at Hatbela and Hridaypur mouza within the command area of Sultanpur piped Water Supply Scheme at Kalna-I Block under Burdwan Division, P.H.E. DTE. (Pt.-B) , SM/08700 Retrofitting Protection work of distribution system (200 mm dia) of 35 Mtr length near the head work site (Right Side) of Sultanpur & its adjoining mouzas water supply scheme by UC Bullah including Drum Sheet within Kalna Sub-Division under Burdwan Division, PHE Dte.[Gr.-E] Assistant Engineer ORD/000845/2020-2021 20/KSD 07/01/2021 30 DEBASHISH ENTERPRISE 0.75 0.00 0 1
4401 PURBA BARDHAMAN Burdwan Division Providing Functional House hold Tap Connection (FHTC) by retrofitting at Hatbela and Hridaypur mouza within the command area of Sultanpur piped Water Supply Scheme at Kalna-I Block under Burdwan Division, P.H.E. DTE. (Pt.-B) , SM/08700 Retrofitting Extension of different dia UPVC pipeline at different section of village Upalati, Hridaypur, Gopalpur, Sultanpur & Hatbele to cover up the uncovered habitation of Sultanpur PWSS within Kalna Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer ORD/000244/2021-2022 6122/BWD 26/10/2021 30 MAJILA ENTERPRISE 14.34 14.29 99.65 1
4402 PURBA BARDHAMAN Burdwan Division Providing Functional House hold Tap Connection (FHTC) by retrofitting at Hatbela and Hridaypur mouza within the command area of Sultanpur piped Water Supply Scheme at Kalna-I Block under Burdwan Division, P.H.E. DTE. (Pt.-B) , SM/08700 Retrofitting Providing FHTC in each household from dist. System within Scheme jurisdiction in Hridaypur, Upalati, Belerhat, Gopalpur, Sultanpur, Isabpur & Naopara Village of SULTANPUR W/S. Scheme under Burdwan Division, PHE Dte. Assistant Engineer ORD/000584/2021-2022 1357/BWD 09/03/2022 30 TAPAS KUMAR ROY 16.69 16.45 98.56 1
4403 PURBA BARDHAMAN Burdwan Division Providing Functional House hold Tap Connection (FHTC) by retrofitting at Hatbela and Hridaypur mouza within the command area of Sultanpur piped Water Supply Scheme at Kalna-I Block under Burdwan Division, P.H.E. DTE. (Pt.-B) , SM/08700 Retrofitting Hire & fuel charges of vehicle (Car No.-WB-04G-7127) for the office of the Assistant Engineer, Kalna Sub-Division, PHE Dte. for the month of December22 to February'23. BILL/00118/2023-2024 30/JJM 19/04/2023 0 PARTHA PRATIM ACHARYA 1.19 0.00 0 0
4404 PURBA BARDHAMAN Burdwan Division Providing Functional House hold Tap Connection (FHTC) by retrofitting at Hatbela and Hridaypur mouza within the command area of Sultanpur piped Water Supply Scheme at Kalna-I Block under Burdwan Division, P.H.E. DTE. (Pt.-B) , SM/08700 Retrofitting Digital structurization of pipeline alignment and asset evaluation including holistic design, preparation of design drawings of overall LDS & preparation of estimate for 11 Nos. Piped W/S. Schemes under Kalna I Block under Kalna Sub-Division under Burdwan Division, PHE. Dte. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000335/2024-2025 3015/BWD 05/08/2024 60 HORIZEN 29.60 11.10 37.5 10
4405 PURBA BARDHAMAN Burdwan Division Augmentation of Sajiara PWSS for providing FHTC under Baurdwan Division. , SM/09716 Augmentation Augmentation of SAJIARA Piped Water Supply Scheme with LDS, Rising Main, Switch Room (with & without water supply & sanitary arrangements), Construction 300 Cum capacity OHR with 20.0 Mtr. Staging height inclusive of soil test & Construction of Boundary wall under Kalna Sub-Division, Block - Purbasthali - II, Dist. - Purba Bardhaman under Burdwan Division, PHE. Dte. Assistant Engineer ORD/000432/2021-2022 645/BWD 01/02/2022 365 UNICON INDIA 318.07 39.69 12.48 0
4406 PURBA BARDHAMAN Burdwan Division Augmentation of Sajiara PWSS for providing FHTC under Baurdwan Division. , SM/09716 Augmentation Preparation of DPR for augmentation of Sajiara W/S Scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. (Sl No-D) Assistant Engineer ORD/000516/2021-2022 184/KSD 21/02/2022 21 M/S R. DUTTA & CO. 2.88 2.88 100 1
4407 PURBA BARDHAMAN Burdwan Division Augmentation of Sajiara PWSS for providing FHTC under Baurdwan Division. , SM/09716 Augmentation Supply of materials for different water supply scheme under Burdwan Division, PHE Dte. VCH/001578/2021-2022 1207/DW 10/03/2022 0 EXECUTIVE ENGINEER, RESOURCES DIVISION, P.H.E. DTE. 3,005.00 0.00 0 0
4408 PURBA BARDHAMAN Central Mechanical Augmentation of Sajiara PWSS for providing FHTC under Baurdwan Division. , SM/09716 Augmentation Supply & Installation of Submersible Pumping Machinery , Voltage Stabilizer, Chlorination system and internal House wiring for Tube well no.- 1 & 2 at Augumentation of Sajiara Water Supply Scheme under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000064/2023-2024 2567/CMD 06/06/2023 30 AMUSAR IMPEX PVT. LTD. 21.95 0.00 0 0
4409 PURBA BARDHAMAN Burdwan Division Augmentation of Sajiara PWSS for providing FHTC under Baurdwan Division. , SM/09716 Augmentation Work Order for "Construction of Pump house cum chlorine room without sanitary (Size 3.60 mtr x 3.00 mtr room) at 2nd Tube well site for augmentation of Sajiara Water Supply Scheme for providing Functional Household Tap Connection (FHTC) within Kalna Sub-Division under Burdwan Division, PHE Dte.^". JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000552/2023-2024 1307/KSD 23/08/2023 60 BUILD-TECH 3.02 0.00 0 0
4410 PURBA BARDHAMAN Burdwan Division Augmentation of Sajiara PWSS for providing FHTC under Baurdwan Division. , SM/09716 Augmentation Construction of Pump House cum chlorine room with sanitary and water supply arrangement at Head Work Site for augmentation of SAJIARA according to departmental drawing No-PHE/BD/P.H/DRG-01/DEC-2017 (Size 3.30 mtr x 3.60 mtr room with 1.2 Mtr. wide verandah) to provide house connection within Kalna Sub-Division under Burdwan Division, PHE Dte._2ND CALL Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000964/2023-2024 5713/BWD 29/12/2023 60 DEL DELTA CONSTRUCTION 5.20 0.00 0 0
4411 PURBA BARDHAMAN Burdwan Division Augmentation of Sajiara PWSS for providing FHTC under Baurdwan Division. , SM/09716 Augmentation Material Requisition To Resource Division RTOR000031/2021-2022 546/BWD 27/01/2022 0 Resource Division 15.25 0.00 0 0
4412 PURBA BARDHAMAN Burdwan Division Augmentation of Sajiara PWSS for providing FHTC under Baurdwan Division. , SM/09716 Augmentation Material Requisition To Resource Division RTOR000147/2021-2022 1244/BWD 07/03/2022 0 Resource Division 2.64 0.00 0 0
4413 PURBA BARDHAMAN Burdwan Division Augmentation of Sajiara PWSS for providing FHTC under Baurdwan Division. , SM/09716 Augmentation Material Requisition To Resource Division RTOR000171/2021-2022 1339/BWD 08/03/2022 0 Resource Division 53.75 0.00 0 0
4414 PURBA BARDHAMAN Burdwan Division Augmentation of Sajiara PWSS for providing FHTC under Baurdwan Division. , SM/09716 Augmentation Material Requisition To Resource Division RTOR000241/2021-2022 1565/BWD 15/03/2022 0 Resource Division 0.37 0.00 0 0
4415 PURBA BARDHAMAN Burdwan Division Augmentation of Sajiara PWSS for providing FHTC under Baurdwan Division. , SM/09716 Augmentation Material Requisition To Resource Division RTOR000021/2022-2023 3274/BWD 29/07/2022 0 Resource Division 34.57 0.00 0 0
4416 PURBA BARDHAMAN Burdwan Division Augmentation of Sajiara PWSS for providing FHTC under Baurdwan Division. , SM/09716 Augmentation Laying of Rising Main for Augmentation of SAJIARA Piped Water Supply Scheme to provide house connection within Kalna Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000597/2023-2024 3766/BWD 29/08/2023 30 CHOWDHURY CONSTRUCTION 8.19 0.00 0 2
4417 PURBA BARDHAMAN Burdwan Division Augmentation of Sajiara PWSS for providing FHTC under Baurdwan Division. , SM/09716 Augmentation Work Order for "Construction of Pump house cum chlorine room without sanitary (Size 3.60 mtr x 3.00 mtr room) at 2nd Tube well site for augmentation of Sajiara Water Supply Scheme for providing Functional Household Tap Connection (FHTC) within Kalna Sub-Division under Burdwan Division, PHE Dte.^". Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000559/2023-2024 1307/KSD 23/08/2023 60 BUILD-TECH 3.02 0.00 0 0
4418 PURBA BARDHAMAN Burdwan Division Augmentation of Sajiara PWSS for providing FHTC under Baurdwan Division. , SM/09716 Augmentation Sinking of 250 X 150mm dia Tube Well 150 mtr. Depth by D.R. Rig method using UPVC pipe (CD) and UPVC Deep Well Screen (RDS) at 1st & 2nd Tubewell site for SAJIARA Piped Water Supply Scheme, Block - Purbasthali - II, Dist - Purba Bardhaman under Burdwan Division, PHE Dte. [2 Nos. GTW]. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000012/2022-2023 1960/BWD 12/04/2022 45 ACME CONSTRUCTION 14.81 13.62 91.96 100
4419 PURBA BARDHAMAN Burdwan Division Augmentation of Sajiara PWSS for providing FHTC under Baurdwan Division. , SM/09716 Augmentation Laying distribution system for augmentation of SAJIARA W/S Scheme to provide house connection within Kalna Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000512/2023-2024 3554/BWD 11/08/2023 45 SK RAJU 42.39 32.46 76.57 40
4420 PURBA BARDHAMAN Burdwan Division Augmentation of Sajiara PWSS for providing FHTC under Baurdwan Division. , SM/09716 Augmentation Construction of boundary wall of SAJIARA Piped water supply Scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. (Length -150 Mtr, No of Columns-43 Nos. Centre to Centre- 3.5 Mtr.) With Double Tie Beam. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000598/2023-2024 4172/BWD 21/09/2023 30 HAIDER ALI MONDAL 14.53 3.84 26.43 80
4421 PURBA BARDHAMAN Burdwan Division Augmentation of Sajiara PWSS for providing FHTC under Baurdwan Division. , SM/09716 Augmentation Quotation from WBSEDCL for Load Enhancement charges of Sajiara water supply scheme of PH-1. under Burdwan Division, PHE Dte. BILL/01725/2023-2024 1402/JJM 29/02/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LTD. 0.32 0.00 0 0
4422 PURBA BARDHAMAN Burdwan Division Augmentation of Sajiara PWSS for providing FHTC under Baurdwan Division. , SM/09716 Augmentation Different types of works involve in connection with Augmentation of SAJIARA (SM/09716), NAMA BHANDARTIKURI (SM/14917) Piped water supply scheme under Purbasthali-II Block, Kalna Sub-Division, PHE Dte. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000394/2024-2025 3010/BWD 02/08/2024 240 PRATIMA CONSTRUCTION 79.16 0.00 0 2
4423 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED SASINARA ZONE II PWSS TO ACCOMMODATE FHTC IN MEMARI-I BLOCK UNDER BURDWAN SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/10056 Augmentation Supply of materials for different water supply scheme under Burdwan Division, PHE Dte. VCH/001578/2021-2022 1207/DW 10/03/2022 0 EXECUTIVE ENGINEER, RESOURCES DIVISION, P.H.E. DTE. 3,005.00 0.00 0 0
4424 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED SASINARA ZONE II PWSS TO ACCOMMODATE FHTC IN MEMARI-I BLOCK UNDER BURDWAN SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/10056 Augmentation Route Survey & Preparation of DPR for Sasinara (Zone-II) & (Zone-III) W/S Scheme under Burdwan-II Block under Burdwan Sub-Division under Burdwan Division PHE Dte. Sl No.2. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000491/2021-2022 177/BSD 31/01/2022 30 RADIANT 3.76 1.88 50 1
4425 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED SASINARA ZONE II PWSS TO ACCOMMODATE FHTC IN MEMARI-I BLOCK UNDER BURDWAN SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/10056 Augmentation Sinking of 300 X 200mm dia Tube Well 150 mtr. Depth by D.R. Rig method using UPVC pipe (CD) and UPVC Deep Well Screen (RDS) for SASINARA Z-II W/S Scheme at Kalsi Mouza, RASULPUR W/S Scheme at 4th TW site & ALIPUR W/S Scheme at 4th TW site under Memari-I Block under within Burdwan Sub-Division, PHE Dte. [For 3 Nos. Tube well]. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000159/2023-2024 2455/BWD 31/05/2023 60 SUSUNIA GP CO. OPERATIVE LABOUR CONTRACT AND CONSTRUCTION SOCIETY LTD. 39.76 13.40 33.7 100
4426 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED SASINARA ZONE II PWSS TO ACCOMMODATE FHTC IN MEMARI-I BLOCK UNDER BURDWAN SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/10056 Augmentation Material Requisition To Resource Division RTOR000175/2021-2022 1332/BWD 08/03/2022 0 Resource Division 108.97 0.00 0 0
4427 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED SASINARA ZONE II PWSS TO ACCOMMODATE FHTC IN MEMARI-I BLOCK UNDER BURDWAN SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/10056 Augmentation Material Requisition To Resource Division RTOR000223/2021-2022 1546/BWD 15/03/2022 0 Resource Division 0.37 0.00 0 0
4428 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED SASINARA ZONE II PWSS TO ACCOMMODATE FHTC IN MEMARI-I BLOCK UNDER BURDWAN SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/10056 Augmentation Material Requisition To Resource Division RTOR000195/2021-2022 1387/BWD 09/03/2022 0 Resource Division 4.83 0.00 0 0
4429 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED SASINARA ZONE II PWSS TO ACCOMMODATE FHTC IN MEMARI-I BLOCK UNDER BURDWAN SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/10056 Augmentation Material Requisition To Resource Division RTOR000044/2022-2023 4851/BWD 20/10/2022 0 Resource Division 10.47 0.00 0 0
4430 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED SASINARA ZONE II PWSS TO ACCOMMODATE FHTC IN MEMARI-I BLOCK UNDER BURDWAN SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/10056 Augmentation Quotation for WBSEDCL for New Service connection of Sasinara Z-II TW-3 water supply scheme. BILL/01244/2023-2024 1149/JJM 29/12/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LTD. 6.03 0.00 0 0
4431 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED SASINARA ZONE II PWSS TO ACCOMMODATE FHTC IN MEMARI-I BLOCK UNDER BURDWAN SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/10056 Augmentation Providing Balance Functional Household Tap Connection (850nos FHTC) from existing distribution system within the command area of SASINARA ZONE-II Piped Water Supply Scheme at (Sasinara, Kalsi, Debipur, Amadpur, Maheshpur, Mobarakpur) Mouza, Construction of boundary wall at head work site, 2nd T/W & 3rd T/W site under MEMARI-I Block of Burdwan Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000531/2023-2024 3628/BWD 21/08/2023 60 A R TRADERS 69.40 69.37 99.96 99
4432 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED SASINARA ZONE II PWSS TO ACCOMMODATE FHTC IN MEMARI-I BLOCK UNDER BURDWAN SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/10056 Augmentation Construction of switch rooms & Rising main at different TW site for SASINARA (Zone-II) Piped Water Supply Scheme under Memari - I Block, District:- Purba-Bardhaman under Burdwan Division, PHE. Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000654/2023-2024 4165/BWD 20/09/2023 60 PAL CONSTRUCTION 9.12 9.11 99.89 100
4433 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED HATKALNA PWSS TO ACCOMMODATE FHTC IN KALNA I BLOCK UNDER KALNA SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/10337 Augmentation Preparation of DPR for augmentation of Hatkalna W/S Scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. (Sl No-C) Assistant Engineer ORD/000610/2021-2022 269/KSD 15/03/2022 21 ROY CHOWDHURY ASSOCIATES 3.23 3.22 99.69 1
4434 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED HATKALNA PWSS TO ACCOMMODATE FHTC IN KALNA I BLOCK UNDER KALNA SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/10337 Augmentation Sinking of Tube well 250 x 200 mm dia Tube well 150 mtr depth by D.R. Rig method using UPVC pipe (CD) and fibre glass strainer for HATKALNA piped water supply scheme (2nd tube well site), Block-Kalna-I, Dist.-Purba Bardhaman, under Burdwan Division, PHE Dte. Assistant Engineer ORD/000962/2020-2021 1492/BWD 18/02/2021 30 C.M. ENTERPRISE 8.68 8.06 92.86 1
4435 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED HATKALNA PWSS TO ACCOMMODATE FHTC IN KALNA I BLOCK UNDER KALNA SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/10337 Augmentation Sinking of 250 X 150mm dia Tube Well 150 mtr. Depth by D.R. Rig method using UPVC pipe (CM) and UPVC Medium Well Screen (RMS) for 2nd TW Site of Aug. HATKALNA & its adjoining mouzas Piped Water Supply Scheme, Block ¿ Kalna ¿ I, Dist - Purba Bardhaman under Burdwan Division, PHE Dte. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000699/2022-2023 605/BWD 17/02/2023 30 AUXILIARY TUBE WELL DRILLERS 8.64 8.44 97.69 1
4436 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED HATKALNA PWSS TO ACCOMMODATE FHTC IN KALNA I BLOCK UNDER KALNA SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/10337 Augmentation Material Requisition To Resource Division RTOR000013/2022-2023 3279/BWD 29/07/2022 0 Resource Division 52.80 0.00 0 0
4437 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED HATKALNA PWSS TO ACCOMMODATE FHTC IN KALNA I BLOCK UNDER KALNA SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/10337 Augmentation Sinking of 250 X 150mm dia Tube Well 150 mtr. Depth by D.R. Rig method using UPVC pipe (CD) and UPVC Deep Well Screen (RDS) for 3RD TW Site of Aug. HATKALNA & its adjoining mouzas Piped Water Supply Scheme, Block ¿ Kalna ¿ I, Dist - Purba Bardhaman under Burdwan Division, PHE Dte. [For 01 No. Tube well]. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000218/2023-2024 2711/BWD 08/06/2023 30 AUXILIARY TUBE WELL DRILLERS 9.89 9.34 94.44 90
4438 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED HATKALNA PWSS TO ACCOMMODATE FHTC IN KALNA I BLOCK UNDER KALNA SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/10337 Augmentation Additional work viz. Carriage of different type of departmental pipes and Interconnection of Tube well and existing pipe line and Restoration of existing concrete road and laying of pipeline of HATKALNA Water Supply Scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000969/2023-2024 003/BWD 02/01/2024 120 S.P. CONSTRUCTION 162.05 161.21 99.48 100
4439 PURBA BARDHAMAN Central Mechanical AUGMENTATION OF GROUND WATER BASED HATKALNA PWSS TO ACCOMMODATE FHTC IN KALNA I BLOCK UNDER KALNA SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/10337 Augmentation Supply & Installation of Chlorination System for Tube well No.-1 at Hat Kalna Water Supply Scheme under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/001866/2023-2024 464/CMSD 21/03/2024 12 JOYGURU ENTERPRISE 0.96 0.96 100 100
4440 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED HATKALNA PWSS TO ACCOMMODATE FHTC IN KALNA I BLOCK UNDER KALNA SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/10337 Augmentation Digital structurization of pipeline alignment and asset evaluation including holistic design, preparation of design drawings of overall LDS & preparation of estimate for 11 Nos. Piped W/S. Schemes under Kalna I Block under Kalna Sub-Division under Burdwan Division, PHE. Dte. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000335/2024-2025 3015/BWD 05/08/2024 60 HORIZEN 29.60 11.10 37.5 10
4441 PURBA BARDHAMAN Central Mechanical AUGMENTATION OF GROUND WATER BASED HATKALNA PWSS TO ACCOMMODATE FHTC IN KALNA I BLOCK UNDER KALNA SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/10337 Augmentation Supply & Installation of Chlorination System for Tube well No.-2 at Hat Kalna Water Supply Scheme under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/001847/2023-2024 377/CMSD 29/02/2024 15 SUDIKSHA CONSTRUCTION 0.96 0.96 100 100
4442 PURBA BARDHAMAN Central Mechanical AUGMENTATION OF GROUND WATER BASED HATKALNA PWSS TO ACCOMMODATE FHTC IN KALNA I BLOCK UNDER KALNA SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/10337 Augmentation QUOTATION FOR NEW SERVICE CONNECTION AT AUGMENTATION OF HAT KALNA PWSS TW 3, BLOCK KALNA-1 BILL/00727/2024-2025 BP-2024-25-285 10/09/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 6.36 0.00 0 0
4443 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED HATKALNA PWSS TO ACCOMMODATE FHTC IN KALNA I BLOCK UNDER KALNA SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/10337 Augmentation Augmentation of Hatkalna Piped Water Supply Scheme with LDS, FHTC, Construction of 1000 cum capacity OHR with 20.0 mtr. with Staging height including soil investigation & construction of switch-rooms & boundary walls at different TW site & repairing of switch rooms under Kalna-I Block, District:- Purba-Bardhaman. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000536/2022-2023 5019/BWD 10/11/2022 1057 S.P. CONSTRUCTION 976.48 858.64 87.93 50
4444 PURBA BARDHAMAN Central Mechanical AUGMENTATION OF GROUND WATER BASED HATKALNA PWSS TO ACCOMMODATE FHTC IN KALNA I BLOCK UNDER KALNA SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/10337 Augmentation Supply & Installation of Submersible Pumping Machinery , Voltage Stabilizer, Chlorination system and internal House wiring of Tube Well No- 01,02 03 & 04 at Augmentation Hatkalna [Block -Kalna-I] Water Supply Scheme under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER Junior Engineer ORD/000916/2022-2023 1080/CMD 03/03/2023 820 P.K. ENGINEERING 41.64 0.00 0 35
4445 PURBA BARDHAMAN Burdwan Division AGUMENTATION OF GROUND WATER BASED BAIDYAPUR PWSS TO ACCOMMODATE FHTC IN KALNA-II BLOCK UNDER KALNA SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT (ZONE-I & ZONE-II) , SM/10032 Augmentation Preparation of DPR for augmentation of Baidyapur W/S Scheme (Zone-I & II) within Kalna Sub-Division under Burdwan Division, PHE Dte. (Sl No-A) Assistant Engineer ORD/000568/2021-2022 203/KSD 23/02/2022 21 INDRANIL DUTTA & ASSOCIATES 4.19 4.17 99.52 1
4446 PURBA BARDHAMAN Burdwan Division AGUMENTATION OF GROUND WATER BASED BAIDYAPUR PWSS TO ACCOMMODATE FHTC IN KALNA-II BLOCK UNDER KALNA SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT (ZONE-I & ZONE-II) , SM/10032 Augmentation Sinking of 250 X 150mm dia Tube Well 150 mtr. Depth by D.R. Rig method using UPVC pipe (CM) and UPVC Medium Well Screen (RMS) for 2nd TW Site of Aug. of BAIDYAPUR (Z-II) & its adjoining mouzas Piped Water Supply Scheme, Block ? Kalna ? II, Dist - Purba Bardhaman under Burdwan Division, PHE Dte._2ND CALL. Assistant Engineer ORD/000567/2022-2023 5274/BWD 30/11/2022 30 SUSUNIA GP CO. OPERATIVE LABOUR CONTRACT AND CONSTRUCTION SOCIETY LTD. 7.33 6.97 95.09 0
4447 PURBA BARDHAMAN Central Mechanical AGUMENTATION OF GROUND WATER BASED BAIDYAPUR PWSS TO ACCOMMODATE FHTC IN KALNA-II BLOCK UNDER KALNA SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT (ZONE-I & ZONE-II) , SM/10032 Augmentation Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Augmentation of BAIDYAPUR PWSS under CMD, PHE Dte., Dist.- Purba-Bardhaman ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000912/2022-2023 1036/CMD 02/03/2023 30 BEHERA ENTERPRISE 11.46 11.13 97.12 80
4448 PURBA BARDHAMAN Burdwan Division AGUMENTATION OF GROUND WATER BASED BAIDYAPUR PWSS TO ACCOMMODATE FHTC IN KALNA-II BLOCK UNDER KALNA SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT (ZONE-I & ZONE-II) , SM/10032 Augmentation Sinking of 250 X 150mm dia Tube Well 150 mtr. Depth by D.R. Rig method using UPVC pipe (CD) and UPVC Deep Well Screen (RDS) for Aug. of BAIDYAPUR (Z-I) PWSS, Block - Kalna - II and NANDAI PWSS, Block - Kalna - I Piped Water Supply Scheme, Dist - Purba Bardhaman under Burdwan Division, PHE Dte. [For 02 Nos. Tube well]. ORD/000151/2023-2024 2424/BWD 30/05/2023 45 KOUSIK MALLICK 19.84 9.14 46.07 100
4449 PURBA BARDHAMAN Burdwan Division AGUMENTATION OF GROUND WATER BASED BAIDYAPUR PWSS TO ACCOMMODATE FHTC IN KALNA-II BLOCK UNDER KALNA SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT (ZONE-I & ZONE-II) , SM/10032 Augmentation Material Requisition To Resource Division RTOR000001/2022-2023 3272/BWD 29/07/2022 0 Resource Division 31.47 0.00 0 0
4450 PURBA BARDHAMAN Burdwan Division AGUMENTATION OF GROUND WATER BASED BAIDYAPUR PWSS TO ACCOMMODATE FHTC IN KALNA-II BLOCK UNDER KALNA SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT (ZONE-I & ZONE-II) , SM/10032 Augmentation New service connection quotation from WBSEDCL of Augmentation of Baidyapur Z-II (T.W.-3) under Burdwan Division, PHE Dte. BILL/00098/2023-2024 194/JJM 31/05/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LTD. 4.56 0.00 0 0
4451 PURBA BARDHAMAN Burdwan Division AGUMENTATION OF GROUND WATER BASED BAIDYAPUR PWSS TO ACCOMMODATE FHTC IN KALNA-II BLOCK UNDER KALNA SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT (ZONE-I & ZONE-II) , SM/10032 Augmentation Work Order for "Restoration in pipe connection of Augmentation scheme of Baidyapur Zone-II Piped Water Supply Scheme under Kalna Sub-Division under Burdwan Division, PHE Dte." (SL-3) Assistant Engineer JUNIOR ENGINEER RWS KALNA2 ORD/001133/2023-2024 2062/KSD 23/02/2024 20 YOUNG ENGINEERS CO.-OPERATIVE SOCIETY LTD. 1.37 0.00 0 0
4452 PURBA BARDHAMAN Burdwan Division AGUMENTATION OF GROUND WATER BASED BAIDYAPUR PWSS TO ACCOMMODATE FHTC IN KALNA-II BLOCK UNDER KALNA SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT (ZONE-I & ZONE-II) , SM/10032 Augmentation Construction of switch rooms & Rising main at different TW site for Baidyapur (Zone-I) Piped Water Supply Scheme under Kalna - II Block, District:- Purba-Bardhaman under Burdwan Division, PHE. Dte. Assistant Engineer JUNIOR ENGINEER RWS KALNA2 ORD/000529/2023-2024 3626/BWD 21/08/2023 60 M/S UNIQUE 9.11 6.67 73.22 65
4453 PURBA BARDHAMAN Burdwan Division AGUMENTATION OF GROUND WATER BASED BAIDYAPUR PWSS TO ACCOMMODATE FHTC IN KALNA-II BLOCK UNDER KALNA SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT (ZONE-I & ZONE-II) , SM/10032 Augmentation Work Order for "Renovation of Pump House for Augmentation 1 of Baidyapur (Zone-II) Piped Water Supply Scheme within Kalna Sub-Division under Burdwan Division, PHE Dte." Assistant Engineer JUNIOR ENGINEER RWS KALNA2 ORD/001241/2023-2024 1953/KSD 05/02/2024 25 ER CONSTRUCTION & GENERAL ORDER SUPPLIER 0.59 0.54 91.53 100
4454 PURBA BARDHAMAN Central Mechanical AGUMENTATION OF GROUND WATER BASED BAIDYAPUR PWSS TO ACCOMMODATE FHTC IN KALNA-II BLOCK UNDER KALNA SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT (ZONE-I & ZONE-II) , SM/10032 Augmentation Supply & Installation of Chlorination System for Tube well No.-1 at Baidyapur (zone-1) Water Supply Scheme under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/001863/2023-2024 461/CMSD 21/03/2024 12 SUDIKSHA CONSTRUCTION 0.96 0.96 100 100
4455 PURBA BARDHAMAN Central Mechanical AGUMENTATION OF GROUND WATER BASED BAIDYAPUR PWSS TO ACCOMMODATE FHTC IN KALNA-II BLOCK UNDER KALNA SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT (ZONE-I & ZONE-II) , SM/10032 Augmentation Supply and delivery of different Electro-mechanical items for Baidyapur zone-1 Water Supply Scheme PH 1 replacement T.W (part-1) under CMD, PHE Dte., Dist.- Purba-Bardhaman ASSISTANT ENGINEER JUNIOR ENGINEER ORD/001670/2023-2024 64/CMSD 11/01/2024 12 SUBRATA BHADRA 0.96 0.94 97.92 100
4456 PURBA BARDHAMAN Central Mechanical AGUMENTATION OF GROUND WATER BASED BAIDYAPUR PWSS TO ACCOMMODATE FHTC IN KALNA-II BLOCK UNDER KALNA SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT (ZONE-I & ZONE-II) , SM/10032 Augmentation House wiring, double earthing and allied works for Baidyapur zone-1 Water Supply Scheme PH 1 replacement T.W (part-2) under CMD, PHE Dte., Dist.- Purba-Bardhaman ASSISTANT ENGINEER JUNIOR ENGINEER ORD/001674/2023-2024 80/CMSD 15/01/2024 12 SUBRATA BHADRA 0.97 0.97 100 100
4457 PURBA BARDHAMAN Central Mechanical AGUMENTATION OF GROUND WATER BASED BAIDYAPUR PWSS TO ACCOMMODATE FHTC IN KALNA-II BLOCK UNDER KALNA SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT (ZONE-I & ZONE-II) , SM/10032 Augmentation Quotation for new service connection at Baidyapur Zone-2 PWSS PH-3 BILL/00390/2024-2025 BP-2024-25-200 18/07/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 4.14 0.00 0 0
4458 PURBA BARDHAMAN Central Mechanical AGUMENTATION OF GROUND WATER BASED BAIDYAPUR PWSS TO ACCOMMODATE FHTC IN KALNA-II BLOCK UNDER KALNA SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT (ZONE-I & ZONE-II) , SM/10032 Augmentation Quotation for load enhancement at Baidyapur PH2 BILL/00810/2024-2025 BP-2024-25-302 24/09/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 5.35 0.00 0 0
4459 PURBA BARDHAMAN Burdwan Division AGUMENTATION OF GROUND WATER BASED BAIDYAPUR PWSS TO ACCOMMODATE FHTC IN KALNA-II BLOCK UNDER KALNA SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT (ZONE-I & ZONE-II) , SM/10032 Augmentation Augmentation of Baidyapur (Zone-I & II) Piped Water Supply Scheme with LDS, FHTC, Rising main, Construction of 200 cum capacity OHR with 20.0 mtr. Staging height inclusive of soil investigation including repairing of OHR, boundary walls & switch rooms under Kalna-II Block, District:- Purba-Burdwan. Assistant Engineer JUNIOR ENGINEER R.W.S. BURDWAN SUB-DIVISION PHE DTE ORD/000116/2022-2023 2859/BWD 22/06/2022 1229 SUPRITI ENTERPRISE 734.07 712.21 97.02 60
4460 PURBA BARDHAMAN Burdwan Division AGUMENTATION OF GROUND WATER BASED BAIDYAPUR PWSS TO ACCOMMODATE FHTC IN KALNA-II BLOCK UNDER KALNA SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT (ZONE-I & ZONE-II) , SM/10032 Augmentation Additional pipe laying of HDPE pipeline & providing FHTC work at Sanpukur, Mirhat village under BAIDYAPUR Water Supply Scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer JUNIOR ENGINEER RWS KALNA2 ORD/000871/2023-2024 5308/BWD 01/12/2023 166 GENUINE ENGINEERING CO-OP. SOCIETY LTD. 35.01 26.03 74.35 1
4461 PURBA BARDHAMAN Central Mechanical AGUMENTATION OF GROUND WATER BASED BAIDYAPUR PWSS TO ACCOMMODATE FHTC IN KALNA-II BLOCK UNDER KALNA SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT (ZONE-I & ZONE-II) , SM/10032 Augmentation Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.- 5 & 6 at Augumentation of BAIDYAPUR Water Supply Scheme [BLOCK- KALNA-2] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/001618/2023-2024 1542/CMD 05/03/2024 425 PROGRESSIVE ENGINEERS CO-OPERATIVE SOCIETY LIMITED 24.62 0.00 0 50
4462 PURBA BARDHAMAN Burdwan Division AGUMENTATION OF GROUND WATER BASED BAIDYAPUR PWSS TO ACCOMMODATE FHTC IN KALNA-II BLOCK UNDER KALNA SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT (ZONE-I & ZONE-II) , SM/10032 Augmentation Different Types of work involved in connection with Augmentation of 6 Nos. [(SM/07827), (SM/07866), (SM/16196), (SM/18314), (SM/16021), (SM/16019)] Piped Water Supply Scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/001144/2024-2025 618/BWD 11/02/2025 180 M/S DATTA ENTERPRISE 578.09 0.00 0 0
4463 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED MOUGRAM (ZONE-I & II) PWSS TO ACCOMMODATE FHTC IN KETUGRAM-II BLOCK UNDER KATWA SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/10123 Augmentation Route Survey and Preparation of DPR for MOUGRAM (ZONE-I & II) PWSS under Ketugram-II Block under Katwa Sub-Division under Burdwan Division PHE Dte. [Sl No-07] Assistant Engineer ORD/000548/2021-2022 67/KTS 27/01/2022 21 RADIANT 4.11 4.11 100 1
4464 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED MOUGRAM (ZONE-I & II) PWSS TO ACCOMMODATE FHTC IN KETUGRAM-II BLOCK UNDER KATWA SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/10123 Augmentation Supply of materials for different water supply scheme under Burdwan Division, PHE Dte. VCH/001578/2021-2022 1207/DW 10/03/2022 0 EXECUTIVE ENGINEER, RESOURCES DIVISION, P.H.E. DTE. 3,005.00 0.00 0 0
4465 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED MOUGRAM (ZONE-I & II) PWSS TO ACCOMMODATE FHTC IN KETUGRAM-II BLOCK UNDER KATWA SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/10123 Augmentation Supply of 1 (one) No. Inspection Vehicle for different JJM Related Works as and when required including supply of driver and fuels (Minimum 8 Hours of duty) under Katwa Sub-Division within Burdwan Division, P.H.E. Dte. Consider 96.00 Km run per Day.(Sl No-1) ORD/000510/2023-2024 499/KTS 22/05/2023 70 M/S MUNMUN DEY 0.90 0.30 33.33 100
4466 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED MOUGRAM (ZONE-I & II) PWSS TO ACCOMMODATE FHTC IN KETUGRAM-II BLOCK UNDER KATWA SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/10123 Augmentation Material Requisition To Resource Division RTOR000189/2021-2022 1383/BWD 09/03/2022 0 Resource Division 4.47 0.00 0 0
4467 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED MOUGRAM (ZONE-I & II) PWSS TO ACCOMMODATE FHTC IN KETUGRAM-II BLOCK UNDER KATWA SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/10123 Augmentation Material Requisition To Resource Division RTOR000177/2021-2022 1335/BWD 08/03/2022 0 Resource Division 25.88 0.00 0 0
4468 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED MOUGRAM (ZONE-I & II) PWSS TO ACCOMMODATE FHTC IN KETUGRAM-II BLOCK UNDER KATWA SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/10123 Augmentation Material Requisition To Resource Division RTOR000229/2021-2022 1551/BWD 15/03/2022 0 Resource Division 0.37 0.00 0 0
4469 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED MOUGRAM (ZONE-I & II) PWSS TO ACCOMMODATE FHTC IN KETUGRAM-II BLOCK UNDER KATWA SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/10123 Augmentation Material Requisition To Resource Division RTOR000017/2022-2023 3280/BWD 29/07/2022 0 Resource Division 34.57 0.00 0 0
4470 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED MOUGRAM (ZONE-I & II) PWSS TO ACCOMMODATE FHTC IN KETUGRAM-II BLOCK UNDER KATWA SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/10123 Augmentation Shifting of 63 KVA DTR at Naliapur village of Augmentation of Mougram Z-II water supply scheme under Burdwan Division, PHE Dte. (Ref ID-860268576, Application ID-100000077306, dt.-02/05/2023) BILL/00142/2023-2024 231/JJM/23-24 13/06/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LTD. 4.21 0.00 0 0
4471 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED MOUGRAM (ZONE-I & II) PWSS TO ACCOMMODATE FHTC IN KETUGRAM-II BLOCK UNDER KATWA SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/10123 Augmentation Continuation order for Supply of 1 (one) No. Inspection Vehicle for different JJM Related Works as and when required including supply of driver and fuels (Minimum 8 Hours of duty) under Katwa Sub-Division within Burdwan Division, P.H.E. Dte. Consider 96.00 Km run per Day. (Sl No-1) Assistant Engineer JUNIOR ENGINEER KATWA SUB-DIVISION PHE DTE ORD/000930/2023-2024 1016/KTS 20/09/2023 23 M/S MUNMUN DEY 0.30 0.12 40 0
4472 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED MOUGRAM (ZONE-I & II) PWSS TO ACCOMMODATE FHTC IN KETUGRAM-II BLOCK UNDER KATWA SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/10123 Augmentation Augmentation of MOUGRAM (ZONE-I) Piped Water Supply Scheme with LDS, FHTC, & Construction of 250 cum capacity OHR with 20.0 mtr. Staging height inclusive of soil investigation under Ketugram-II Block, District:- Purba-Burdwan. Assistant Engineer Junior Engineer, R.W.S., Katwa-I Dev. Block ORD/000087/2022-2023 2611/BWD 23/05/2022 365 UMWELT ENGINEER PVT LTD 499.84 314.31 62.88 97
4473 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED MOUGRAM (ZONE-I & II) PWSS TO ACCOMMODATE FHTC IN KETUGRAM-II BLOCK UNDER KATWA SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT , SM/10123 Augmentation Augmentation of MOUGRAM (ZONE-II) Piped Water Supply Scheme with LDS, FHTC, & Construction of 300 cum capacity OHR with 20.0 mtr. Staging height inclusive of soil investigation under Ketugram-II Block, District:- Purba-Burdwan. Assistant Engineer Junior Engineer, R.W.S., Katwa-I Dev. Block ORD/000100/2022-2023 2782/BWD 14/06/2022 365 G.D. CONSTRUCTION & CO. 357.17 159.13 44.55 75
4474 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Gramdihi Piped Water Supply Scheme at Bhatar Block , SM/07777 Retrofitting Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of Gramdihi Piped Water Supply Scheme at Mandarbati, Gholada & Bigra Village (Mouza), Bhatar Block under Burdwan Division, PHE Dte. (Agreement no. 792/BWD of 2020-2021) Assistant Engineer ORD/000434/2020-2021 1794/BWD 26/02/2021 45 M/S GUPTA ENTERPRISE 41.94 33.90 80.83 1
4475 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Gramdihi Piped Water Supply Scheme at Bhatar Block , SM/07777 Retrofitting Extension of UPVC pipe line of LDS at Gholada village for providing FHTC of Gramdihi and its adjoining mouzas W/S Scheme within Bhatar Block under Burdwan Division, P.H.E. Dte. [Gr.-C] Assistant Engineer ORD/000264/2021-2022 691/DSD 08/12/2021 30 M/S GUPTA ENTERPRISE 4.84 0.00 0 1
4476 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Gramdihi Piped Water Supply Scheme at Bhatar Block , SM/07777 Retrofitting Extension of pipeline in Connection to FHTC work at Gramdihi village of Gramdihi and its adjoining Mouza's Piped W/S Scheme at Bhatar Block within Durgapur (Bardhaman North)Sub-Division under Burdwan Division, P.H.E. Dte. (Gr.-A) Assistant Engineer ORD/000105/2021-2022 416/DSD 02/07/2021 30 DEY NIRMAN 4.71 0.23 4.88 1
4477 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Gramdihi Piped Water Supply Scheme at Bhatar Block , SM/07777 Retrofitting Extension of UPVC pipe line of LDS at Bighra village for providing FHTC of Gramdihi and its adjoining mouzas W/S Scheme within Bhatar Block under Burdwan Division, P.H.E. Dte. [Gr.-D] Assistant Engineer ORD/000265/2021-2022 692/DSD 08/12/2021 30 SHUBHRA KANTI GHOSH 4.30 4.10 95.35 1
4478 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Gramdihi Piped Water Supply Scheme at Bhatar Block , SM/07777 Retrofitting Extension of UPVC pipe line of LDS at Manderbati village and Majhipara for providing FHTC of Gramdihi and its adjoining mouzas W/S Scheme within Bhatar Block under Burdwan Division, P.H.E. Dte. [Gr.-B] Assistant Engineer ORD/000263/2021-2022 690/DSD 08/12/2021 30 BIPLAB SAMANTA 2.26 2.22 98.23 1
4479 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Gramdihi Piped Water Supply Scheme at Bhatar Block , SM/07777 Retrofitting Providing leftout water tap connection in different villages for 100% coverage to make it Sajal Gram from existing distribution system within scheme jurisdiction of different Piped Water Supply Schemes within Bhatar Block under Burdwan Division, PHE. Dte. Assistant Engineer ,Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000389/2021-2022 268/BWD 14/01/2022 30 BHARAT CONSTRUCTION 14.17 7.45 52.58 1
4480 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Gramdihi Piped Water Supply Scheme at Bhatar Block , SM/07777 Retrofitting Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of Gramdihi Piped Water Supply Scheme at Gramdihi & Sanchalida Village (Mouza), Bhatar Block under Burdwan Division, PHE Dte. [Agreement No. 631/BWD OF 2020-2021.] AE(HQs) J.E. 2 BURDWAN ORD/000436/2020-2021 956/BWD 03/02/2021 45 DEY NIRMAN 35.08 41.01 116.9 0
4481 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Gramdihi Piped Water Supply Scheme at Bhatar Block , SM/07777 Retrofitting Restoration of work due to laying of Water Supply Pipelines along Bonpass Village(Kamarpara) to Banpass Railway Station Road by Public Health Engineering Directorate under " Jal Jeevan Mission from 0.00 km to 1.54 km in the district of Purba Bardhaman under Burdwan Division,P.W.D." BILL/00709/2024-2025 866/JJM 23/09/2024 0 EXECUTIVE ENGINEER PWD BURDWAN DIVISION 2.94 0.00 0 0
4482 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Gramdihi Piped Water Supply Scheme at Bhatar Block , SM/07777 Retrofitting Payment of vehicle bill (Car No.-WB-41H-9788) for the month of September'23. BILL/01343/2023-2024 899/JJM 22/11/2023 0 SK. ASRAFUDDIN 0.40 0.00 0 0
4483 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Gramdihi Piped Water Supply Scheme at Bhatar Block , SM/07777 Retrofitting Restoration of damaged flanks due to laying of HDPE pipe line along the flank of Burdwan Katwa Road from 14.70 kmp to 16.20 kmp in the district of Purba Bardhaman under Bardhaman Division,P.W.D. BILL/00711/2024-2025 867/JJM 23/09/2024 0 EXECUTIVE ENGINEER PWD BURDWAN DIVISION 7.90 0.00 0 0
4484 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Gramdihi Piped Water Supply Scheme at Bhatar Block , SM/07777 Retrofitting Laying Piper Line and FHTC for Gramdihi Jr. Basic School under Gramdihi Piped water supply Scheme , P.H.E Dte. Block:-Bhatar Dist: Purba Bardhaman ORD/000524/2025-2026 1020/DSD 10/07/2025 15 INDIAN ENGINEERS CO.-OPERATIVE SOCIETY LTD. 0.15 0.00 0 0
4485 PURBA BARDHAMAN Burdwan Division Augmentation of SATGACHI PWSS for providing Functional Household Tap Connection (FHTC) Block- Kalna-II Purba Burdwan West Bengal , SM/09921 Augmentation Preparation of DPR for augmentation of Satgachhi W/S Scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. (Sl No-B) Assistant Engineer ORD/000514/2021-2022 182/KSD 21/02/2022 21 M/S R. DUTTA & CO. 3.27 3.22 98.47 1
4486 PURBA BARDHAMAN Burdwan Division Augmentation of SATGACHI PWSS for providing Functional Household Tap Connection (FHTC) Block- Kalna-II Purba Burdwan West Bengal , SM/09921 Augmentation Supply of materials for different water supply scheme under Burdwan Division, PHE Dte. VCH/001578/2021-2022 1207/DW 10/03/2022 0 EXECUTIVE ENGINEER, RESOURCES DIVISION, P.H.E. DTE. 3,005.00 0.00 0 0
4487 PURBA BARDHAMAN Burdwan Division Augmentation of SATGACHI PWSS for providing Functional Household Tap Connection (FHTC) Block- Kalna-II Purba Burdwan West Bengal , SM/09921 Augmentation Extension of 75 mm dia pipeline at Miya Para, Modhya Bohar & Bhagar Para Purba Bohar regarding FHTC under Satgachia (Zone-I) water supply scheme under Burdwan Division, PHE Dte.[Gr.-A] Assistant Engineer ,Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000350/2021-2022 703/BSD 11/06/2021 5 M/S SAYAN CHAKRABORTY 0.88 0.00 0 1
4488 PURBA BARDHAMAN Burdwan Division Augmentation of SATGACHI PWSS for providing Functional Household Tap Connection (FHTC) Block- Kalna-II Purba Burdwan West Bengal , SM/09921 Augmentation Material Requisition To Resource Division RTOR000173/2021-2022 1331/BWD 08/03/2022 0 Resource Division 160.86 0.00 0 0
4489 PURBA BARDHAMAN Burdwan Division Augmentation of SATGACHI PWSS for providing Functional Household Tap Connection (FHTC) Block- Kalna-II Purba Burdwan West Bengal , SM/09921 Augmentation Material Requisition To Resource Division RTOR000038/2021-2022 551/BWD 27/01/2022 0 Resource Division 39.34 0.00 0 0
4490 PURBA BARDHAMAN Burdwan Division Augmentation of SATGACHI PWSS for providing Functional Household Tap Connection (FHTC) Block- Kalna-II Purba Burdwan West Bengal , SM/09921 Augmentation Material Requisition To Resource Division RTOR000222/2021-2022 1545/BWD 15/03/2022 0 Resource Division 0.37 0.00 0 0
4491 PURBA BARDHAMAN Burdwan Division Augmentation of SATGACHI PWSS for providing Functional Household Tap Connection (FHTC) Block- Kalna-II Purba Burdwan West Bengal , SM/09921 Augmentation Material Requisition To Resource Division RTOR000194/2021-2022 1388/BWD 09/03/2022 0 Resource Division 4.60 0.00 0 0
4492 PURBA BARDHAMAN Burdwan Division Augmentation of SATGACHI PWSS for providing Functional Household Tap Connection (FHTC) Block- Kalna-II Purba Burdwan West Bengal , SM/09921 Augmentation Material Requisition To Resource Division RTOR000014/2022-2023 3273/BWD 29/07/2022 0 Resource Division 33.26 0.00 0 0
4493 PURBA BARDHAMAN Burdwan Division Augmentation of SATGACHI PWSS for providing Functional Household Tap Connection (FHTC) Block- Kalna-II Purba Burdwan West Bengal , SM/09921 Augmentation Material Requisition To Resource Division RTOR000038/2022-2023 4630/BWD 17/10/2022 0 Resource Division 12.32 0.00 0 0
4494 PURBA BARDHAMAN Central Mechanical Augmentation of SATGACHI PWSS for providing Functional Household Tap Connection (FHTC) Block- Kalna-II Purba Burdwan West Bengal , SM/09921 Augmentation New service connection charges for Aug. of Satgachi PWSS TW-4 BILL/01395/2023-2024 BP-2023-24-137 25/08/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.67 0.00 0 0
4495 PURBA BARDHAMAN Central Mechanical Augmentation of SATGACHI PWSS for providing Functional Household Tap Connection (FHTC) Block- Kalna-II Purba Burdwan West Bengal , SM/09921 Augmentation New service connection charges for Aug. of Satgachi PWSS TW-3 BILL/01393/2023-2024 BP-2023-24-136 25/08/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 6.05 0.00 0 0
4496 PURBA BARDHAMAN Central Mechanical Augmentation of SATGACHI PWSS for providing Functional Household Tap Connection (FHTC) Block- Kalna-II Purba Burdwan West Bengal , SM/09921 Augmentation Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination system and internal House wiring for Tube well no.- 1 & 2 at Augumentation of Satgachi Water Supply Scheme under CMD, PHE Dte., Dist.- Purba-Bardhaman. [2nd CALL] ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000210/2023-2024 3046/CMD 20/07/2023 30 AMUSAR IMPEX PVT. LTD. 21.98 21.21 96.5 95
4497 PURBA BARDHAMAN Burdwan Division Augmentation of SATGACHI PWSS for providing Functional Household Tap Connection (FHTC) Block- Kalna-II Purba Burdwan West Bengal , SM/09921 Augmentation Sinking of additional 250 X 150mm dia Tube Well 150 mtr. Depth by D.R. Rig method using UPVC pipe (CD) and UPVC Deep Well Screen (RDS) for SATGACHHI Piped Water Supply Scheme, Block - Kalna - II, Dist - Purba Bardhaman under Burdwan Division, PHE Dte. Assistant Engineer ORD/000069/2022-2023 2423/BWD 11/05/2022 30 M/S SYCHROTECH INDUSTRY 9.01 8.56 95.01 100
4498 PURBA BARDHAMAN Burdwan Division Augmentation of SATGACHI PWSS for providing Functional Household Tap Connection (FHTC) Block- Kalna-II Purba Burdwan West Bengal , SM/09921 Augmentation Digital structurization of pipeline alignment and asset evaluation including holistic design, preparation of design drawings of overall LDS & preparation of estimate for 03 Nos. Piped W/S. Schemes under Kalna II Block under Kalna Sub-Division under Burdwan Division, PHE. Dte. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000336/2024-2025 3016/BWD 05/08/2024 20 HORIZEN 7.55 2.50 33.11 100
4499 PURBA BARDHAMAN Central Mechanical Augmentation of SATGACHI PWSS for providing Functional Household Tap Connection (FHTC) Block- Kalna-II Purba Burdwan West Bengal , SM/09921 Augmentation Quotation for new service connection at Satgachi PWSS PH 5 BILL/00933/2024-2025 BP-2024-25-351 05/10/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.59 0.00 0 0
4500 PURBA BARDHAMAN Burdwan Division Augmentation of SATGACHI PWSS for providing Functional Household Tap Connection (FHTC) Block- Kalna-II Purba Burdwan West Bengal , SM/09921 Augmentation Augmentation of SATGACHI Piped Water Supply Scheme with LDS, FHTC, Rising main, Construction of 700 cum capacity OHR with 20.0 mtr. Staging height inclusive of soil investigation including construction of switch-room (3.60mx3.0m) & boundary wall under Kalna-II Block, District:- Purba-Burdwan. Assistant Engineer JUNIOR ENGINEER R.W.S. BURDWAN SUB-DIVISION PHE DTE ORD/000065/2022-2023 2339/BWD 10/05/2022 1056 P.B. ENTERPRISE 727.47 593.81 81.63 100
4501 PURBA BARDHAMAN Burdwan Division Laying of pipe line (parallel to the main line) of the existing Distribution System and providing Functional Household Tap connection (FHTC) from existing distribution system within the command area of Srikhanda PWSS at Katwa-I block under Burdwan divisio , SM/12116 Augmentation Laying of pipe line (Parallel to the main line) of the existing Distribution System and Providing Functional Household Tap Connection(FHTC) from existing distribution system within the command area of SRIKHANDA Piped Water Supply Scheme at Katwa-I Block under Burdwan Division, PHE Dte. Assistant Engineer ORD/000023/2022-2023 2027/BWD 18/04/2022 30 M/S JOY 53.12 53.15 100.06 1
4502 PURBA BARDHAMAN Burdwan Division Laying of pipe line (parallel to the main line) of the existing Distribution System and providing Functional Household Tap connection (FHTC) from existing distribution system within the command area of Srikhanda PWSS at Katwa-I block under Burdwan divisio , SM/12116 Augmentation Balance work of OHR, construction Concrete Road, Functional Household Tap Connection, Road restoration etc. for Nanagar PWSS, Srikhanda PWSS, under KATWA -I Block under Katwa Sub-Divn under Burdwan Division, PHE Dte. District:- Purba-Bardhaman. Assistant Engineer ORD/000685/2024-2025 3655/BWD 21/10/2024 120 HAMID SK 121.69 0.00 0 0
4503 PURBA BARDHAMAN Khandaghosh Burdwan Division KHUNDKURI PIPED WATER SUPPLY SCHEME , SM/13465 New Supply & delivery of different dia. MJ Coller for FHTC as well as smooth running of different W/S. Schemes under Burdwan Division, P.H.E. Dte. [i.e. (1) Magra PWSS, Memari-I Block, (2) Kuchut PWSS, Memari - II Block, (3) Khundkuri PWSS, Khandaghosh Block & (4) Samanti PWSS, Burdwan - II Block)] ORD/000653/2023-2024 4076/BWD 13/09/2023 20 SSPR VALVE MANUFACTURING PVT LTD. 20.63 5.00 24.24 100
4504 PURBA BARDHAMAN Khandaghosh Burdwan Division KHUNDKURI PIPED WATER SUPPLY SCHEME , SM/13465 New Material Requisition To Resource Division RTOR000074/2022-2023 1253/BWD 17/03/2023 0 Resource Division 16.58 0.00 0 0
4505 PURBA BARDHAMAN Khandaghosh Burdwan Division KHUNDKURI PIPED WATER SUPPLY SCHEME , SM/13465 New Material Requisition To Resource Division RTOR000106/2022-2023 1631/BWD 06/04/2023 0 Resource Division 12.19 0.00 0 0
4506 PURBA BARDHAMAN Khandaghosh Burdwan Division KHUNDKURI PIPED WATER SUPPLY SCHEME , SM/13465 New Material Requisition To Resource Division RTOR000705/2023-2024 5046/BWD 23/11/2023 0 Resource Division 20.46 0.00 0 0
4507 PURBA BARDHAMAN Khandaghosh Central Mechanical KHUNDKURI PIPED WATER SUPPLY SCHEME , SM/13465 New New service connection charges for Khundkuri PWSS TW-1 BILL/01035/2023-2024 BP-2023-24-115 16/08/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 9.93 0.00 0 0
4508 PURBA BARDHAMAN Khandaghosh Central Mechanical KHUNDKURI PIPED WATER SUPPLY SCHEME , SM/13465 New New service connection charges for Khundkuri PWSS TW-2 BILL/01036/2023-2024 BP-2023-24-116 16/08/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 0.65 0.00 0 0
4509 PURBA BARDHAMAN Khandaghosh Burdwan Division KHUNDKURI PIPED WATER SUPPLY SCHEME , SM/13465 New Continuation order for "Supply of one No. Diesel Driven Ambassador Car on hire basis for the office of the Assistant Engineer, Burdwan Sub-Division, PHE Dte for the period of 01.12.2023 to 31.05.2024 Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/001007/2023-2024 2751/BSD 28/11/2023 183 SK.ASFIA 2.40 0.40 16.67 70
4510 PURBA BARDHAMAN Khandaghosh Central Mechanical KHUNDKURI PIPED WATER SUPPLY SCHEME , SM/13465 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at BICHKHARA & others water supply scheme under Khandoghosh Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman ASSISTANT ENGINEER Junior Engineer ORD/000064/2024-2025 2390/CMD 02/08/2024 90 MS DAS ELECTRIC CO 46.54 0.00 0 0
4511 PURBA BARDHAMAN Khandaghosh Central Mechanical KHUNDKURI PIPED WATER SUPPLY SCHEME , SM/13465 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at Khundkuri Water Supply Scheme [ Block- Khandogosh ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER Junior Engineer ORD/000052/2023-2024 2513/CMD 02/06/2023 30 RAJIB COMPANY 28.95 23.86 82.42 98
4512 PURBA BARDHAMAN Khandaghosh Burdwan Division KHUNDKURI PIPED WATER SUPPLY SCHEME , SM/13465 New Interconnection between pump house and delivery line and Construction of boundary wall at 2nd TW site for KHUDKURI PWSS under Khandaghosh Block, District:- Purba-Bardhaman. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000869/2023-2024 5309/BWD 01/12/2023 60 JYOTI ENTERPRISE 12.63 12.60 99.76 100
4513 PURBA BARDHAMAN Khandaghosh Burdwan Division KHUNDKURI PIPED WATER SUPPLY SCHEME , SM/13465 New Repairing damaged concrete road by Cement concrete (mix 1:1.5:3) and drainage system, Sluice valve chamber for FHTC work for KHANDAGHOSH, TARAPOSH, SAGRAI, SANKARI, KHUDKURI, ONARI PWSS and its adjoining mouzas within KHANDAGHOSH BLOCK under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000689/2024-2025 3684/BWD 23/10/2024 90 SUPRIYA RAY 115.68 0.00 0 20
4514 PURBA BARDHAMAN Khandaghosh Burdwan Division KHUNDKURI PIPED WATER SUPPLY SCHEME , SM/13465 New Field level data validation of FHTC executed by Agencies on the basis of pictorial data with the objective of controlling multiple entry,improving data quality in terms of absolute household by verification through electric connection or any other unique documents and making error free database of KHUNDKURI Pipe Water Supply Scheme in Khandaghosh Block within Burdwan Sub-Division under Burdwan Division,PHE Dte. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000890/2024-2025 2671/BSD 04/12/2024 30 TECHVISION 1.08 0.00 0 100
4515 PURBA BARDHAMAN Khandaghosh Burdwan Division KHUNDKURI PIPED WATER SUPPLY SCHEME , SM/13465 New KHUNDKURI Piped Water Supply Scheme with sinking of Tube-well, LDS, Rising Main, FHTC, Construction of 350 cum capacity RCC OHR with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drain and internal pathway at different TW site under Khandaghosh Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000753/2022-2023 1217/BWD 16/03/2023 747 M/S JAN MAHAMMAD 510.97 401.24 78.53 100
4516 PURBA BARDHAMAN Burdwan-I Burdwan Division KHAIDYA PIPED WATER SUPPLY SCHEME , SM/13946 New Material Requisition To Resource Division RTOR000100/2023-2024 1962/BWD 25/04/2023 0 Resource Division 2.56 0.00 0 0
4517 PURBA BARDHAMAN Burdwan-I Burdwan Division KHAIDYA PIPED WATER SUPPLY SCHEME , SM/13946 New Material Requisition To Resource Division RTOR000376/2023-2024 2197/BWD 12/05/2023 0 Resource Division 9.37 0.00 0 0
4518 PURBA BARDHAMAN Burdwan-I Burdwan Division KHAIDYA PIPED WATER SUPPLY SCHEME , SM/13946 New Material Requisition To Resource Division RTOR000723/2023-2024 5264/BWD 30/11/2023 0 Resource Division 21.07 0.00 0 0
4519 PURBA BARDHAMAN Burdwan-I Central Mechanical KHAIDYA PIPED WATER SUPPLY SCHEME , SM/13946 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at MALKITA & others water supply scheme under Bardhaman-I Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman ASSISTANT ENGINEER Junior Engineer ORD/000066/2024-2025 2388/CMD 02/08/2024 90 ELECTRICAL & MECHANICAL ENGINEERING CORPORATION 55.95 0.00 0 0
4520 PURBA BARDHAMAN Burdwan-I Central Mechanical KHAIDYA PIPED WATER SUPPLY SCHEME , SM/13946 New New service connection charges for Khaidya PWSS TW-1 BILL/02201/2023-2024 BP-2023-24-396 17/01/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.66 0.00 0 0
4521 PURBA BARDHAMAN Burdwan-I Central Mechanical KHAIDYA PIPED WATER SUPPLY SCHEME , SM/13946 New New service connection charges for Khaidya PWSS TW-2 BILL/02202/2023-2024 BP-2023-24-397 17/01/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 7.36 0.00 0 0
4522 PURBA BARDHAMAN Burdwan-I Burdwan Division KHAIDYA PIPED WATER SUPPLY SCHEME , SM/13946 New Different works related (sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of different capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site) to BARASAT, JAGADABAD & KHAIDYA Piped Water Supply Scheme under BURDWAN-I Block, District:- Purba Bardhaman [NEW SCHEME] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. J.E. 1 BURDWAN ORD/000465/2023-2024 3460/BWD 08/08/2023 783 CONCORD EMC ENCLAVE LLP 1,526.24 183.82 12.04 5
4523 PURBA BARDHAMAN Burdwan-I Central Mechanical KHAIDYA PIPED WATER SUPPLY SCHEME , SM/13946 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at Khaidya Water Supply Scheme [ Block- Burdwan-1 ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER Junior Engineer ORD/000657/2023-2024 4000/CMD 29/08/2023 642 AHALYA ENGINEERING WORKS 28.95 0.00 0 90
4524 PURBA BARDHAMAN Purbasthali-I Burdwan Division KACHUA PIPED WATER SUPPLY SCHEME , SM/13497 New Material Requisition To Resource Division RTOR000298/2023-2024 2197/BWD 12/05/2023 0 Resource Division 1.90 0.00 0 0
4525 PURBA BARDHAMAN Purbasthali-I Burdwan Division KACHUA PIPED WATER SUPPLY SCHEME , SM/13497 New Material Requisition To Resource Division RTOR000473/2023-2024 3997/BWD 08/09/2023 0 Resource Division 0.55 0.00 0 0
4526 PURBA BARDHAMAN Purbasthali-I Burdwan Division KACHUA PIPED WATER SUPPLY SCHEME , SM/13497 New Material Requisition To Resource Division RTOR000799/2023-2024 310/BWD 24/01/2024 0 Resource Division 17.19 0.00 0 0
4527 PURBA BARDHAMAN Purbasthali-I Central Mechanical KACHUA PIPED WATER SUPPLY SCHEME , SM/13497 New New service connection for KACHUA PWSS TW-2. BILL/02396/2023-2024 BP-2023-24-505 06/02/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.03 0.00 0 0
4528 PURBA BARDHAMAN Purbasthali-I Central Mechanical KACHUA PIPED WATER SUPPLY SCHEME , SM/13497 New New service connection for KACHUA PWSS TW-1. BILL/02395/2023-2024 BP-2023-24-504 06/02/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 5.27 0.00 0 0
4529 PURBA BARDHAMAN Purbasthali-I Burdwan Division KACHUA PIPED WATER SUPPLY SCHEME , SM/13497 New Different works related (sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of different capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site) to KACHUA & KAMALPUR Piped Water Supply Scheme under Purbasthali ¿ I Block, District:- Purba Bardhaman [NEW SCHEME] Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000133/2023-2024 2344/BWD 22/05/2023 863 CONCORD ENGINEERING 470.92 169.93 36.08 40
4530 PURBA BARDHAMAN Purbasthali-I Burdwan Division KACHUA PIPED WATER SUPPLY SCHEME , SM/13497 New Different Types of work involved in connection with Augmentation of SONARUDRA (SM/16349) & KACHUA (SM/13497) Piped Water Supply Scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000192/2024-2025 2430/BWD 27/06/2024 480 R.G. INFRASTRUCTURE 240.70 103.84 43.14 2
4531 PURBA BARDHAMAN Purbasthali-I Central Mechanical KACHUA PIPED WATER SUPPLY SCHEME , SM/13497 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Haripur & others water supply scheme under purbasthali 1 Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000072/2024-2025 2397/CMD 02/08/2024 90 CHATTERJEE ENTERPRISE 48.60 0.00 0 30
4532 PURBA BARDHAMAN Kalna-I Burdwan Division TAIPARA Piped Water Supply Scheme. , SM/14442 New Material Requisition To Resource Division RTOR000183/2023-2024 2155/BWD 10/05/2023 0 Resource Division 14.82 0.00 0 0
4533 PURBA BARDHAMAN Kalna-I Burdwan Division TAIPARA Piped Water Supply Scheme. , SM/14442 New Material Requisition To Resource Division RTOR000628/2023-2024 4888/BWD 10/11/2023 0 Resource Division 29.45 0.00 0 0
4534 PURBA BARDHAMAN Kalna-I Burdwan Division TAIPARA Piped Water Supply Scheme. , SM/14442 New Material Requisition To Resource Division RTOR000044/2023-2024 1962/BWD 25/04/2023 0 Resource Division 22.25 0.00 0 0
4535 PURBA BARDHAMAN Kalna-I Central Mechanical TAIPARA Piped Water Supply Scheme. , SM/14442 New Quotation for New Electric Connection for Taipara W/S Scheme PH NO.-1 BILL/01733/2023-2024 BP-2023-24-248 07/12/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 9.10 0.00 0 0
4536 PURBA BARDHAMAN Kalna-I Central Mechanical TAIPARA Piped Water Supply Scheme. , SM/14442 New Electric quotation for New Service Connection at Taipara W/S Scehem PH-2. BILL/01776/2023-2024 BP-2023-24-288 26/12/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.67 0.00 0 0
4537 PURBA BARDHAMAN Kalna-I Central Mechanical TAIPARA Piped Water Supply Scheme. , SM/14442 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Joykrishnapur & others water supply scheme under Purbasthali-2,jamalpur,kalna 1 Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000101/2024-2025 2398/CMD 02/08/2024 90 MS S G ENTERPRISE 53.43 0.00 0 0
4538 PURBA BARDHAMAN Kalna-I Burdwan Division TAIPARA Piped Water Supply Scheme. , SM/14442 New Work Order for "Restoration of pipeline with other allied works at different places of Dhaleswar mouja under Taipara Pwss due to construction of rcc cover drain & widening of rcc concrete road constructed by PRI body under Kalna-I panchayat samiti under Kalna Sub-Division under Burdwan Division, PHE Dte." Assistant Engineer Junior Engineer, R.W.S. Burdwan Sub Division, P.H.E. Dt ORD/000548/2024-2025 973/KSD 31/07/2024 10 S.GHOSH & ASSOCIATES PVT LTD. 2.29 2.15 93.89 100
4539 PURBA BARDHAMAN Kalna-I Burdwan Division TAIPARA Piped Water Supply Scheme. , SM/14442 New Work Order for "CONSTRUCTION OF TEMPORARY KIOSK FOR THE NECESSARY ARRANGEMENT OF ELECTRIFICATION OF TUBEWELL UNDER PATHARDANGA PWSS AND TAIPARA PWSS UNDER KALNA SUB-DIVISION UNDER BURDWAN DIVISION, PHE DTE. (2 UNITS:- 1 NO FOR PATHARDANGA PWSS & 1 NO FOR TAIPARA PWSS)" Assistant Engineer Junior Engineer, R.W.S. Burdwan Sub Division, P.H.E. Dt ORD/001141/2023-2024 1977/KSD 09/02/2024 10 BISWAS ENTERPRISE 0.66 0.33 50 100
4540 PURBA BARDHAMAN Kalna-I Burdwan Division TAIPARA Piped Water Supply Scheme. , SM/14442 New Work order for "Restoration of pipeline with other allied works at different places of Bagpur mouja under Taipara Pwss due to construction of rcc cover drain & widening of rcc concrete road constructed by PRI body under Kalna-I panchayat samiti under Kalna Sub-Division under Burdwan Division, PHE Dte." Assistant Engineer Junior Engineer, R.W.S. Burdwan Sub Division, P.H.E. Dt ORD/000528/2024-2025 971/KSD 31/07/2024 10 S.GHOSH & ASSOCIATES PVT LTD. 2.84 2.62 92.25 100
4541 PURBA BARDHAMAN Kalna-I Burdwan Division TAIPARA Piped Water Supply Scheme. , SM/14442 New Work order for "Restoration of pipeline with other allied works at different places of Rajkhara mouja under Taipara Pwss due to construction of rcc cover drain & widening of rcc concrete road constructed by PRI body under Kalna-I panchayat samiti under Kalna Sub-Division under Burdwan Division, PHE Dte.". Assistant Engineer Junior Engineer, R.W.S. Burdwan Sub Division, P.H.E. Dt ORD/000527/2024-2025 970/KSD 31/07/2024 10 S.GHOSH & ASSOCIATES PVT LTD. 2.75 2.69 97.82 100
4542 PURBA BARDHAMAN Kalna-I Burdwan Division TAIPARA Piped Water Supply Scheme. , SM/14442 New Work Order for "Restoration of pipeline with other allied works at different places of Bherua mouja under Taipara Pwss due to construction of rcc cover drain & widening of rcc concrete road constructed by PRI body under Kalna-I panchayat samiti under Kalna Sub-Division under Burdwan Division, PHE Dte." Assistant Engineer Junior Engineer, R.W.S. Burdwan Sub Division, P.H.E. Dt ORD/000529/2024-2025 972/KSD 31/07/2024 10 S.GHOSH & ASSOCIATES PVT LTD. 3.39 3.28 96.76 100
4543 PURBA BARDHAMAN Kalna-I Burdwan Division TAIPARA Piped Water Supply Scheme. , SM/14442 New Different works related (sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of different capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site) to TAIPARA & NIRALGACHHI Piped Water Supply Scheme under Manteswar Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer Junior Engineer, R.W.S. Burdwan Sub Division, P.H.E. Dt ORD/000048/2023-2024 1825/BWD 19/04/2023 865 S. GHOSH & ASSOCIATES PVT LTD. 1,064.74 341.44 32.07 85
4544 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED WATER SUPPLY SCHEME FOR NASRATPUR PWSS (PART-B) UNDER BURDWAN DIVISION BLOCK PURBASTHALI I DISTRICT PURBA BARDDHAMAN , SM/14014 Augmentation Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of NASARATPUR Piped Water Supply Scheme at Gopinathpur (Part), Nasaratput (Part) & Paruldanga (Part) Village (Mouza), Purbasthali - I Block under Burdwan Division, PHE Dte Assistant Engineer ORD/000372/2021-2022 211/BWD 11/01/2022 60 KHEPIMA ENGINEERS CO. OPERATIVE SOCIETY LTD. 76.77 59.72 77.79 1
4545 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED WATER SUPPLY SCHEME FOR NASRATPUR PWSS (PART-B) UNDER BURDWAN DIVISION BLOCK PURBASTHALI I DISTRICT PURBA BARDDHAMAN , SM/14014 Augmentation Digital structurization of pipeline alignment and asset evaluation including holistic design, preparation of design drawings of overall LDS & preparation of estimate for 14 Nos. Piped W/S. Schemes under Purbasthali I Block under Kalna Sub-Division under Burdwan Division, PHE. Dte. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000337/2024-2025 3017/BWD 05/08/2024 75 HORIZEN 38.00 13.64 35.89 100
4546 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED WATER SUPPLY SCHEME FOR NASRATPUR PWSS (PART-B) UNDER BURDWAN DIVISION BLOCK PURBASTHALI I DISTRICT PURBA BARDDHAMAN , SM/14014 Augmentation Work Order for "CONSTRUCTION OF TEMPORARY KIOSK FOR THE NECESSARY ARRANGEMENT OF ELECTRIFICATION OF TUBEWELL UNDER NASARATPUR PWSS UNDER KALNA SUB-DIVISION UNDER BURDWAN DIVISION, PHE DTE." Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/001142/2023-2024 1978/KSD 09/02/2024 10 BISWAS ENTERPRISE 0.66 0.66 100 100
4547 PURBA BARDHAMAN Central Mechanical AUGMENTATION OF GROUND WATER BASED WATER SUPPLY SCHEME FOR NASRATPUR PWSS (PART-B) UNDER BURDWAN DIVISION BLOCK PURBASTHALI I DISTRICT PURBA BARDDHAMAN , SM/14014 Augmentation New service connection for Augmentation of Nasratpur PWSS TW-2. BILL/02397/2023-2024 BP-2023-24-509 06/02/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 8.21 0.00 0 0
4548 PURBA BARDHAMAN Central Mechanical AUGMENTATION OF GROUND WATER BASED WATER SUPPLY SCHEME FOR NASRATPUR PWSS (PART-B) UNDER BURDWAN DIVISION BLOCK PURBASTHALI I DISTRICT PURBA BARDDHAMAN , SM/14014 Augmentation New service connection for augmentation of Nasratpur PH-I PWSS. BILL/00085/2024-2025 BP-2024-25-30 19/04/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 10.19 0.00 0 0
4549 PURBA BARDHAMAN Central Mechanical AUGMENTATION OF GROUND WATER BASED WATER SUPPLY SCHEME FOR NASRATPUR PWSS (PART-B) UNDER BURDWAN DIVISION BLOCK PURBASTHALI I DISTRICT PURBA BARDDHAMAN , SM/14014 Augmentation Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.- 3 & 4 at Augumentation of NASRATPUR Water Supply Scheme [BLOCK- PURBASTHALI-1] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/001613/2023-2024 1544/CMD 05/03/2024 453 MS DAS ELECTRIC CO 24.63 11.70 47.5 95
4550 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED WATER SUPPLY SCHEME FOR NASRATPUR PWSS (PART-B) UNDER BURDWAN DIVISION BLOCK PURBASTHALI I DISTRICT PURBA BARDDHAMAN , SM/14014 Augmentation Different types of works involve in connection with Augmentation of NASRATPUR PWSS (SM/14014), Purbasthali-I Block, under Kalna Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer ORD/001098/2024-2025 432/BWD 20/01/2025 120 SANDIP BISWAS 199.50 0.00 0 0
4551 PURBA BARDHAMAN Manteswar Burdwan Division GROUND WATER SUPPLY BASED PIPED WATER SUPPLY SCHEME FOR PARGUNA PWSS IN MANTESHWAR BLOCK OF PURBA BARDHAMAN UNDER BURDWAN DIVISION PHE DTE , SM/13282 New Material Requisition To Resource Division RTOR000364/2023-2024 2197/BWD 12/05/2023 0 Resource Division 11.04 0.00 0 0
4552 PURBA BARDHAMAN Manteswar Burdwan Division GROUND WATER SUPPLY BASED PIPED WATER SUPPLY SCHEME FOR PARGUNA PWSS IN MANTESHWAR BLOCK OF PURBA BARDHAMAN UNDER BURDWAN DIVISION PHE DTE , SM/13282 New Material Requisition To Resource Division RTOR000544/2023-2024 4298/BWD 29/09/2023 0 Resource Division 136.65 0.00 0 0
4553 PURBA BARDHAMAN Manteswar Central Mechanical GROUND WATER SUPPLY BASED PIPED WATER SUPPLY SCHEME FOR PARGUNA PWSS IN MANTESHWAR BLOCK OF PURBA BARDHAMAN UNDER BURDWAN DIVISION PHE DTE , SM/13282 New NEW SERVICE CONNECTION FOR PURGUNA PIPED WATER SUPPLY SCHEME. BILL/02830/2023-2024 BP-2023-24-586 04/03/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 6.73 0.00 0 0
4554 PURBA BARDHAMAN Manteswar Central Mechanical GROUND WATER SUPPLY BASED PIPED WATER SUPPLY SCHEME FOR PARGUNA PWSS IN MANTESHWAR BLOCK OF PURBA BARDHAMAN UNDER BURDWAN DIVISION PHE DTE , SM/13282 New New service connection for Parguna PH-2 PWSS. BILL/00088/2024-2025 BP-2024-25-27 19/04/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 7.38 0.00 0 0
4555 PURBA BARDHAMAN Manteswar Central Mechanical GROUND WATER SUPPLY BASED PIPED WATER SUPPLY SCHEME FOR PARGUNA PWSS IN MANTESHWAR BLOCK OF PURBA BARDHAMAN UNDER BURDWAN DIVISION PHE DTE , SM/13282 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at Parguna Water Supply Scheme [ Block- Monteshwar ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000737/2023-2024 4047/CMD 29/08/2023 30 SINHA ELECTRICALS 27.78 0.00 0 90
4556 PURBA BARDHAMAN Manteswar Burdwan Division GROUND WATER SUPPLY BASED PIPED WATER SUPPLY SCHEME FOR PARGUNA PWSS IN MANTESHWAR BLOCK OF PURBA BARDHAMAN UNDER BURDWAN DIVISION PHE DTE , SM/13282 New Different works related (sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of different capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site) to BELENDA, JAMNA, PIPLON & PARGUNA Piped Water Supply Scheme under Manteswar Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer1, Durgapur Sub-Division, PHE Dte. ORD/000689/2023-2024 4388/BWD 05/10/2023 667 AKASH CONSTRUCTION 2,296.40 164.51 7.16 50
4557 PURBA BARDHAMAN Manteswar Central Mechanical GROUND WATER SUPPLY BASED PIPED WATER SUPPLY SCHEME FOR PARGUNA PWSS IN MANTESHWAR BLOCK OF PURBA BARDHAMAN UNDER BURDWAN DIVISION PHE DTE , SM/13282 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Sutra & others water supply scheme under Monteswar Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000068/2024-2025 2396/CMD 02/08/2024 455 SINHA ELECTRICALS 78.06 0.00 0 20
4558 PURBA BARDHAMAN Kalna-I Central Mechanical UTRA PIPED WATER SUPPLY SCHEME , SM/14077 New Continuation order for Hiring of Inspection Vehicle (Diesel/CNG/LPG Driven) for supervision of site for the office of the Assistant Engineer, under C.M.D. P.H.E. Dte. w.e.f.-01/09/2023 to 31/10/2023 [JJM Works]. ASSISTANT ENGINEER ORD/000851/2023-2024 734/CMSD-I 29/08/2023 61 SUBRATA BHADRA 0.79 0.79 100 50
4559 PURBA BARDHAMAN Kalna-I Burdwan Division UTRA PIPED WATER SUPPLY SCHEME , SM/14077 New Material Requisition To Resource Division RTOR000040/2023-2024 1962/BWD 25/04/2023 0 Resource Division 49.01 0.00 0 0
4560 PURBA BARDHAMAN Kalna-I Burdwan Division UTRA PIPED WATER SUPPLY SCHEME , SM/14077 New Material Requisition To Resource Division RTOR000188/2023-2024 2155/BWD 10/05/2023 0 Resource Division 12.47 0.00 0 0
4561 PURBA BARDHAMAN Kalna-I Burdwan Division UTRA PIPED WATER SUPPLY SCHEME , SM/14077 New Material Requisition To Resource Division RTOR000568/2023-2024 4940/BWD 10/11/2023 0 Resource Division 39.83 0.00 0 0
4562 PURBA BARDHAMAN Kalna-I Central Mechanical UTRA PIPED WATER SUPPLY SCHEME , SM/14077 New New service connection charges for Utra PWSS TW 1 BILL/00815/2023-2024 BP-2023-24-91 31/07/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 4.03 0.00 0 0
4563 PURBA BARDHAMAN Kalna-I Central Mechanical UTRA PIPED WATER SUPPLY SCHEME , SM/14077 New New service connection charges for Utra PWSS TW 2 BILL/00812/2023-2024 BP-2023-24-90 28/07/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.59 0.00 0 0
4564 PURBA BARDHAMAN Kalna-I Burdwan Division UTRA PIPED WATER SUPPLY SCHEME , SM/14077 New UTRA Piped Water Supply Scheme with sinking of Tube-well, LDS, Rising Main, FHTC, Construction of 300 cum capacity RCC OHR with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drain and internal pathway at different TW site under Monteswar Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer Junior Engineer, R.W.S. Burdwan Sub Division, P.H.E. Dt ORD/000009/2023-2024 1698/BWD 12/04/2023 365 M/S S.S. ENTERPRISE 487.32 426.97 87.62 87
4565 PURBA BARDHAMAN Kalna-I Central Mechanical UTRA PIPED WATER SUPPLY SCHEME , SM/14077 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Joykrishnapur & others water supply scheme under Purbasthali-2,jamalpur,kalna 1 Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000101/2024-2025 2398/CMD 02/08/2024 90 MS S G ENTERPRISE 53.43 0.00 0 0
4566 PURBA BARDHAMAN Kalna-I Central Mechanical UTRA PIPED WATER SUPPLY SCHEME , SM/14077 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at UTRA Water Supply Scheme [ Block- KALNA-1] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000140/2023-2024 2857/CMD 05/07/2023 30 SOUNAK ENTERPRISE 28.48 23.15 81.29 90
4567 PURBA BARDHAMAN Kalna-I Central Mechanical UTRA PIPED WATER SUPPLY SCHEME , SM/14077 New Supply and Delivery of standby Chlorination System for Utra PH 1 & others Water Supply Scheme under CMD, PHE Dte. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/001598/2023-2024 812/CMSD 04/10/2023 30 SUBRATA BHADRA 0.90 0.90 100 100
4568 PURBA BARDHAMAN Kalna-I Central Mechanical UTRA PIPED WATER SUPPLY SCHEME , SM/14077 New Supply and Delivery of standby Chlorination System for Utra PH 2 & others Water Supply Scheme under CMD, PHE Dte. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/001599/2023-2024 813/CMSD 04/10/2023 30 SUBRATA BHADRA 0.90 0.90 100 100
4569 PURBA BARDHAMAN Kalna-I Central Mechanical UTRA PIPED WATER SUPPLY SCHEME , SM/14077 New Standby Pump Motor set for Utra PH 2 Water Supply Scheme under CMD, PHE Dte. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/001662/2023-2024 1074/CMSD 15/12/2023 12 M/S. S.D. CONSTRUCTION 0.84 0.84 100 100
4570 PURBA BARDHAMAN Kalna-I Central Mechanical UTRA PIPED WATER SUPPLY SCHEME , SM/14077 New Standby Pump Motor set for UTRA PH 1 water supply scheme under CMD,PHE,Dte. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/001729/2023-2024 1076/CMSD 15/12/2023 15 SUDIKSHA CONSTRUCTION 0.84 0.84 100 100
4571 PURBA BARDHAMAN Purbasthali-I Burdwan Division MASGARIA PIPED WATER SUPPLY SCHEME , SM/13318 New Material Requisition To Resource Division RTOR000157/2023-2024 2155/BWD 10/05/2023 0 Resource Division 13.55 0.00 0 0
4572 PURBA BARDHAMAN Purbasthali-I Burdwan Division MASGARIA PIPED WATER SUPPLY SCHEME , SM/13318 New Material Requisition To Resource Division RTOR000472/2023-2024 3996/BWD 08/09/2023 0 Resource Division 1.64 0.00 0 0
4573 PURBA BARDHAMAN Purbasthali-I Central Mechanical MASGARIA PIPED WATER SUPPLY SCHEME , SM/13318 New New service connection charges for Masgaria PWSS TW-1 BILL/01428/2023-2024 BP-2023-24-132 05/09/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.75 0.00 0 0
4574 PURBA BARDHAMAN Purbasthali-I Central Mechanical MASGARIA PIPED WATER SUPPLY SCHEME , SM/13318 New New service connection charges for Masgaria PWSS TW-2 BILL/01467/2023-2024 BP-2023-24-165 26/09/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.20 0.00 0 0
4575 PURBA BARDHAMAN Purbasthali-I Burdwan Division MASGARIA PIPED WATER SUPPLY SCHEME , SM/13318 New Different works related (sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of different capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site) to KONRAPUR & MASGARIA Piped Water Supply Scheme under Purbasthali-I Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000026/2023-2024 1765/BWD 17/04/2023 365 M/S ASHA CONSTRUCTION 710.72 202.16 28.44 43
4576 PURBA BARDHAMAN Purbasthali-I Central Mechanical MASGARIA PIPED WATER SUPPLY SCHEME , SM/13318 New Supply and delivery of different Electro-mechanical items (for urgent FHTC) for masgaria Water Supply Scheme PH 2 (part-1) under CMD, PHE Dte., Dist.- Purba-Bardhaman ASSISTANT ENGINEER JUNIOR ENGINEER ORD/001668/2023-2024 07/CMSD 02/01/2024 10 DIPALI CONSTRUCTION 0.92 0.92 100 100
4577 PURBA BARDHAMAN Purbasthali-I Central Mechanical MASGARIA PIPED WATER SUPPLY SCHEME , SM/13318 New Emergency installation (for urgent FHTC) at Masgaria Water Supply Scheme PH 2 (part-3) under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/001677/2023-2024 84/CMSD 15/01/2024 12 DIPALI CONSTRUCTION 0.80 0.80 100 100
4578 PURBA BARDHAMAN Purbasthali-I Burdwan Division MASGARIA PIPED WATER SUPPLY SCHEME , SM/13318 New Work Order for "CONSTRUCTION OF TEMPORARY KIOSK FOR THE NECESSARY ARRANGEMENT OF ELECTRIFICATION OF TUBEWELL FOR MASGARIA PWSS UNDER KALNA SUB-DIVISION UNDER BURDWN DIVISION, PHE DTE." Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/001145/2023-2024 1981/KSD 09/02/2024 10 ER CONSTRUCTION & GENERAL ORDER SUPPLIER 0.33 0.33 100 2
4579 PURBA BARDHAMAN Purbasthali-I Central Mechanical MASGARIA PIPED WATER SUPPLY SCHEME , SM/13318 New Supply and delivery of submersible pumping machinery (for urgent FHTC) for masgaria Water Supply Scheme PH 2 (part-2) under CMD, PHE Dte., Dist.- Purba-Bardhaman ASSISTANT ENGINEER JUNIOR ENGINEER ORD/001673/2023-2024 67/CMSD 11/01/2024 12 DIPALI CONSTRUCTION 0.85 0.85 100 100
4580 PURBA BARDHAMAN Purbasthali-I Burdwan Division MASGARIA PIPED WATER SUPPLY SCHEME , SM/13318 New Material Requisition To Resource Division RTOR000803/2023-2024 294/BWD 24/01/2024 0 Resource Division 14.63 0.00 0 0
4581 PURBA BARDHAMAN Purbasthali-I Central Mechanical MASGARIA PIPED WATER SUPPLY SCHEME , SM/13318 New Addl quotation for New service connection charges for Masgaria PWSS TW-1 BILL/01729/2023-2024 BP-2023-24-240 07/12/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.44 0.00 0 0
4582 PURBA BARDHAMAN Purbasthali-I Burdwan Division MASGARIA PIPED WATER SUPPLY SCHEME , SM/13318 New Providing leftout FHTC at different places of Malatipur village in order to declare swajal gram under the command area of Masgaria Piped Water Supply Scheme within Kalna Sub Division under Burdwan Division, PHE. Dte. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000764/2024-2025 3759/BWD 29/10/2024 30 IYASIN DAFADAR 7.80 0.00 0 100
4583 PURBA BARDHAMAN Purbasthali-I Burdwan Division MASGARIA PIPED WATER SUPPLY SCHEME , SM/13318 New Work order for Work order for "Providing left out FHTC at different places of Bhaidrapur village in order to declare swajal gram under the command area of Masgoria Piped water supply scheme within Kalna Sub-Division under Burdwan Division, PHE Dte." Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000836/2024-2025 1777/KSD 20/11/2024 30 IYASIN DAFADAR 4.89 0.00 0 1
4584 PURBA BARDHAMAN Purbasthali-I Burdwan Division MASGARIA PIPED WATER SUPPLY SCHEME , SM/13318 New Providing left out FHTC at different places of Rajipur, Kansaripur village in order to declare swajal gram under the command area of Masgoria Piped water supply scheme within Kalna Sub-Division under Burdwan Division, PHE Dte Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000712/2024-2025 3718/BWD 29/10/2024 83 ER CONSTRUCTION & GENERAL ORDER SUPPLIER 8.45 0.00 0 100
4585 PURBA BARDHAMAN Purbasthali-I Burdwan Division MASGARIA PIPED WATER SUPPLY SCHEME , SM/13318 New Providing left out FHTC at different places of Bachpur village in order to declare swajal gram under the command area of Masgoria Piped water supply scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000713/2024-2025 3719/BWD 29/10/2024 83 ER CONSTRUCTION & GENERAL ORDER SUPPLIER 7.57 0.00 0 80
4586 PURBA BARDHAMAN Purbasthali-I Burdwan Division MASGARIA PIPED WATER SUPPLY SCHEME , SM/13318 New Different types of balance works involve in connection with KONRAPUR (SM/13419) & MASGORIA (SM/13318) Piped water supply scheme under Purbasthali-I Block within Kalna Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/001028/2024-2025 142/BWD 08/01/2025 120 M/S ASHA CONSTRUCTION 65.74 0.00 0 0
4587 PURBA BARDHAMAN Purbasthali-I Central Mechanical MASGARIA PIPED WATER SUPPLY SCHEME , SM/13318 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Manganpur & others water supply scheme under Purbasthali 1 Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000714/2024-2025 2979/CMD 25/11/2024 90 H.K. DAS & CO. 53.27 0.00 0 0
4588 PURBA BARDHAMAN Mangolkote Burdwan Division KHERUA PIPED WATER SUPPLY SCHEME , SM/15240 New Material Requisition To Resource Division RTOR000099/2022-2023 1639/BWD 06/04/2023 0 Resource Division 1.38 0.00 0 0
4589 PURBA BARDHAMAN Mangolkote Burdwan Division KHERUA PIPED WATER SUPPLY SCHEME , SM/15240 New Material Requisition To Resource Division RTOR000059/2022-2023 1245/BWD 17/03/2023 0 Resource Division 9.37 0.00 0 0
4590 PURBA BARDHAMAN Mangolkote Burdwan Division KHERUA PIPED WATER SUPPLY SCHEME , SM/15240 New Material Requisition To Resource Division RTOR000706/2023-2024 5045/BWD 23/11/2023 0 Resource Division 20.46 0.00 0 0
4591 PURBA BARDHAMAN Mangolkote Central Mechanical KHERUA PIPED WATER SUPPLY SCHEME , SM/15240 New Additional quotation for New service connection charges for Kherua PWSS TW-2 BILL/01348/2023-2024 BP-2023-24-128 21/08/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 0.03 0.00 0 0
4592 PURBA BARDHAMAN Mangolkote Central Mechanical KHERUA PIPED WATER SUPPLY SCHEME , SM/15240 New New service connection charges of Kherua W/S Scheme TW-1 BILL/00688/2023-2024 BP-2023-24-33 26/06/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 4.59 0.00 0 0
4593 PURBA BARDHAMAN Mangolkote Central Mechanical KHERUA PIPED WATER SUPPLY SCHEME , SM/15240 New New service connection charges for Kherua PWSS TW-2 BILL/01263/2023-2024 BP-2023-24-124 18/08/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 5.67 0.00 0 0
4594 PURBA BARDHAMAN Mangolkote Central Mechanical KHERUA PIPED WATER SUPPLY SCHEME , SM/15240 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Jabagram & others water supply scheme under Mangalkote Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. Driller In-Charge Junior Engineer ORD/000118/2024-2025 2590/CMD 27/08/2024 90 M/S SAJAHAN CHOWDHURY 62.06 0.00 0 0
4595 PURBA BARDHAMAN Mangolkote Central Mechanical KHERUA PIPED WATER SUPPLY SCHEME , SM/15240 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at KHERUA Water Supply Scheme [ Block- MONGOLKOTE] under CMD, PHE Dte., Dist.- Purba-Bardhaman. Driller In-Charge Junior Engineer ORD/000047/2023-2024 2510/CMD 02/06/2023 30 GOENKA ENTERPRISE 26.97 21.45 79.53 100
4596 PURBA BARDHAMAN Mangolkote Burdwan Division KHERUA PIPED WATER SUPPLY SCHEME , SM/15240 New Different works related (sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of different capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site) to GOHAGRAM, KHERUA & JABAGRAM Piped Water Supply Scheme under Mangalkote Block, District:- Purba Bardhaman [NEW SCHEME] Assistant Engineer JUNIOR ENGINEER KATWA SUB-DIVISION PHE DTE,JUNIOR ENGINEER R.W.S. BURDWAN SUB-DIVISION PHE DTE ORD/000697/2022-2023 582/BWD 17/02/2023 1049 PUSPA ENTERPRISE 1,185.88 346.54 29.22 75
4597 PURBA BARDHAMAN Mangolkote Burdwan Division KHERUA PIPED WATER SUPPLY SCHEME , SM/15240 New Different types of works involve in connection with implementation of Gohgram, Jabagram, Kherua, Lakshmipur & Simulia Piped Water Supply Scheme under Mongolkote Block within Katwa Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer ORD/001301/2024-2025 936/BWD 11/03/2025 180 M/S GHOSH CONSTRUCTION 360.68 0.00 0 0
4598 PURBA BARDHAMAN Mangolkote Burdwan Division DEULIA PIPED WATER SUPPLY SCHEME , SM/14973 New Material Requisition To Resource Division RTOR000242/2023-2024 2197/BWD 12/05/2023 0 Resource Division 7.44 0.00 0 0
4599 PURBA BARDHAMAN Mangolkote Burdwan Division DEULIA PIPED WATER SUPPLY SCHEME , SM/14973 New Material Requisition To Resource Division RTOR000457/2023-2024 3981/BWD 08/09/2023 0 Resource Division 44.04 0.00 0 0
4600 PURBA BARDHAMAN Mangolkote Burdwan Division DEULIA PIPED WATER SUPPLY SCHEME , SM/14973 New Material Requisition To Resource Division RTOR000665/2023-2024 5086/BWD 23/11/2023 0 Resource Division 20.46 0.00 0 0
4601 PURBA BARDHAMAN Mangolkote Central Mechanical DEULIA PIPED WATER SUPPLY SCHEME , SM/14973 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Jabagram & others water supply scheme under Mangalkote Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. Driller In-Charge Junior Engineer ORD/000118/2024-2025 2590/CMD 27/08/2024 90 M/S SAJAHAN CHOWDHURY 62.06 0.00 0 0
4602 PURBA BARDHAMAN Mangolkote Burdwan Division DEULIA PIPED WATER SUPPLY SCHEME , SM/14973 New Supply of 1 (one) No. Inspection Vehicle for different JJM Related Works as and when required including supply of driver and fuels (Minimum 8 Hours of duty) under Katwa Sub-Division within Burdwan Division, P.H.E. Dte. Consider 96.00 Km run per Day. Assistant Engineer JUNIOR ENGINEER KATWA SUB-DIVISION PHE DTE ORD/001080/2023-2024 22/KTS 05/01/2024 70 AJIT SAMANTA 0.90 0.30 33.33 100
4603 PURBA BARDHAMAN Mangolkote Central Mechanical DEULIA PIPED WATER SUPPLY SCHEME , SM/14973 New QUOTATION FOR NEW SERVICE CONNECTION AT DEULIA PWSS TW-1 BILL/00368/2024-2025 BP-2024-25-189 08/07/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 4.69 0.00 0 0
4604 PURBA BARDHAMAN Mangolkote Central Mechanical DEULIA PIPED WATER SUPPLY SCHEME , SM/14973 New Quotation for new service connection at Deulia PWSS TW-2. BILL/01188/2024-2025 BP-2024-25-410 11/12/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 8.52 0.00 0 0
4605 PURBA BARDHAMAN Mangolkote Burdwan Division DEULIA PIPED WATER SUPPLY SCHEME , SM/14973 New Different works related (sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of different capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site) to DEULIA, GOBARDHANPUR, KHARIJA-KASHIGRAM & UNIATATARPUR Piped Water Supply Scheme under Mangolkote Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer JUNIOR ENGINEER KATWA SUB-DIVISION PHE DTE ORD/000477/2023-2024 3491/BWD 09/08/2023 815 POWER TOOLS & ENGINEERING 1,741.05 34.35 1.97 10
4606 PURBA BARDHAMAN Mangolkote Central Mechanical DEULIA PIPED WATER SUPPLY SCHEME , SM/14973 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at DEULIA Water Supply Scheme [ Block- MONGOLKOTE] under CMD, PHE Dte., Dist.- Purba-Bardhaman. Driller In-Charge Junior Engineer ORD/000821/2023-2024 4098/CMD 29/08/2023 640 CHOUDHURY ENTERPRISE 28.94 0.00 0 43
4607 PURBA BARDHAMAN Mangolkote Burdwan Division DEULIA PIPED WATER SUPPLY SCHEME , SM/14973 New Balance works for different type of works in connection with Jaggeswardihi PWSS, Deulia PWSS, Kunda PWSS and Gohagram PWSS Under Mongalkote Block within Katwa Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer JUNIOR ENGINEER KATWA SUB-DIVISION PHE DTE ORD/001186/2024-2025 593/BWD 07/02/2025 120 MD HASIN 203.38 0.00 0 20
4608 PURBA BARDHAMAN Memari-I Burdwan Division TATARPUR PIPED WATER SUPPLY SCHEME , SM/14740 New Material Requisition To Resource Division RTOR000330/2023-2024 2197/BWD 12/05/2023 0 Resource Division 10.10 0.00 0 0
4609 PURBA BARDHAMAN Memari-I Burdwan Division TATARPUR PIPED WATER SUPPLY SCHEME , SM/14740 New Material Requisition To Resource Division RTOR000470/2023-2024 3994/BWD 08/09/2023 0 Resource Division 12.51 0.00 0 0
4610 PURBA BARDHAMAN Memari-I Burdwan Division TATARPUR PIPED WATER SUPPLY SCHEME , SM/14740 New Material Requisition To Resource Division RTOR000696/2023-2024 5059/BWD 23/11/2023 0 Resource Division 20.46 0.00 0 0
4611 PURBA BARDHAMAN Memari-I Central Mechanical TATARPUR PIPED WATER SUPPLY SCHEME , SM/14740 New New service connection charges for Tatarpur PWSS TW-1 BILL/01761/2023-2024 BP-2023-24-271 15/12/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 38.70 0.00 0 0
4612 PURBA BARDHAMAN Memari-I Burdwan Division TATARPUR PIPED WATER SUPPLY SCHEME , SM/14740 New Continuation order for "Supply of one No. Diesel Driven Ambassador Car on hire basis for the office of the Assistant Engineer, Burdwan Sub-Division, PHE Dte for the period of 01.12.2023 to 31.05.2024 Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/001007/2023-2024 2751/BSD 28/11/2023 183 SK.ASFIA 2.40 0.40 16.67 70
4613 PURBA BARDHAMAN Memari-I Central Mechanical TATARPUR PIPED WATER SUPPLY SCHEME , SM/14740 New New Service connection for Tatarpur W/S Scheme PH No.-II BILL/01792/2023-2024 BP-2023-24-309 30/12/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 9.61 0.00 0 0
4614 PURBA BARDHAMAN Memari-I Burdwan Division TATARPUR PIPED WATER SUPPLY SCHEME , SM/14740 New TATARPUR Piped Water Supply Scheme with sinking of Tube-well, LDS, Rising Main, FHTC, Construction of 250 cum capacity RCC OHR with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drain and internal pathway at different TW site under Memari-I Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000375/2023-2024 2621/BWD 06/06/2023 940 RANADHIR SINHA 359.46 154.50 42.98 50
4615 PURBA BARDHAMAN Memari-I Central Mechanical TATARPUR PIPED WATER SUPPLY SCHEME , SM/14740 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at Tatarpur Water Supply Scheme [ Block- Memari-1 ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER Junior Engineer ORD/000466/2023-2024 3723/CMD 08/08/2023 30 M.S. ENTERPRISE 30.11 0.00 0 95
4616 PURBA BARDHAMAN Memari-I Burdwan Division TATARPUR PIPED WATER SUPPLY SCHEME , SM/14740 New Restoration of concrete road by Cement concrete (mix 1:1.5:3), Providing balance FHTC, parallel pipeline, drainage system, boundary wall, Bridge, land development, Sluice valve chamber for smooth water supply of FHTC work for TATARPUR PWSS and its adjoining mouzas within MEMARI-I BLOCK under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/001116/2024-2025 479/BWD 24/01/2025 90 RANADHIR SINHA 74.75 0.00 0 0
4617 PURBA BARDHAMAN Burdwan-I Burdwan Division HALDI PIPED WATER SUPPLY SINGLE VILLAGE SCHEME , SM/14906 New Material Requisition To Resource Division RTOR000001/2023-2024 1962/BWD 25/04/2023 0 Resource Division 4.69 0.00 0 0
4618 PURBA BARDHAMAN Burdwan-I Burdwan Division HALDI PIPED WATER SUPPLY SINGLE VILLAGE SCHEME , SM/14906 New Material Requisition To Resource Division RTOR000272/2023-2024 2197/BWD 12/05/2023 0 Resource Division 4.03 0.00 0 0
4619 PURBA BARDHAMAN Burdwan-I Burdwan Division HALDI PIPED WATER SUPPLY SINGLE VILLAGE SCHEME , SM/14906 New Land demarcation and preparation of sketch map for Haldi, Sultanpur, Berugram & Karail Piped W/S. Scheme (New Scheme) at different Blocks under JJM under Burdwan Division, PHE Dte. AE(HQs) J.E. 1 BURDWAN ORD/000756/2023-2024 842/AE/HQ 01/11/2023 15 M/S S. CHOUDHURY 0.33 0.00 0 100
4620 PURBA BARDHAMAN Burdwan-I Central Mechanical HALDI PIPED WATER SUPPLY SINGLE VILLAGE SCHEME , SM/14906 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at MALKITA & others water supply scheme under Bardhaman-I Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman ASSISTANT ENGINEER Junior Engineer ORD/000066/2024-2025 2388/CMD 02/08/2024 90 ELECTRICAL & MECHANICAL ENGINEERING CORPORATION 55.95 0.00 0 0
4621 PURBA BARDHAMAN Burdwan-I Burdwan Division HALDI PIPED WATER SUPPLY SINGLE VILLAGE SCHEME , SM/14906 New Material Requisition To Resource Division RTOR000790/2023-2024 332/BWD 24/01/2024 0 Resource Division 21.17 0.00 0 0
4622 PURBA BARDHAMAN Burdwan-I Central Mechanical HALDI PIPED WATER SUPPLY SINGLE VILLAGE SCHEME , SM/14906 New New service connection for HALDI PWSS TW 1. BILL/02444/2023-2024 BP-2023-24-523 09/02/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 5.00 0.00 0 0
4623 PURBA BARDHAMAN Burdwan-I Central Mechanical HALDI PIPED WATER SUPPLY SINGLE VILLAGE SCHEME , SM/14906 New NEW SERVICE CONNECTION FOR HALDI PWSS BILL/02835/2023-2024 BP-2023-24-591 04/03/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 8.50 0.00 0 0
4624 PURBA BARDHAMAN Burdwan-I Burdwan Division HALDI PIPED WATER SUPPLY SINGLE VILLAGE SCHEME , SM/14906 New Continuation for the work of Supply of one No. Diesel Driven Car ( other than Ambasader) on hire basis for the office of the Assistant Engineer, RWS Burdwan Sub- Division, PHE Dte. (Period from 01-07-2025 to 31-08-2025). ASSISTANT ENGINEER R.W.S. BURDWAN SUB-DIVISION PHE DTE Contractual Junior Engineer ORD/000168/2025-2026 158/RWS 30/06/2025 62 MD HASIN 0.80 0.00 0 0
4625 PURBA BARDHAMAN Burdwan-I Burdwan Division HALDI PIPED WATER SUPPLY SINGLE VILLAGE SCHEME , SM/14906 New Continuation for the work of Supply of one No. Diesel Driven Car ( other than Ambasader) on hire basis for the office of the Assistant Engineer, RWS Burdwan Sub- Division, PHE Dte. (Period from 01-09-2025 to 31-10-2025). ASSISTANT ENGINEER R.W.S. BURDWAN SUB-DIVISION PHE DTE Contractual Junior Engineer ORD/000598/2025-2026 197/RWS 01/09/2025 61 MD HASIN 0.80 0.00 0 0
4626 PURBA BARDHAMAN Mangolkote Burdwan Division KUNDA PIPED WATER SUPPLY SCHEME , SM/14913 New Material Requisition To Resource Division RTOR000116/2023-2024 1965/BWD 26/04/2023 0 Resource Division 1.64 0.00 0 0
4627 PURBA BARDHAMAN Mangolkote Burdwan Division KUNDA PIPED WATER SUPPLY SCHEME , SM/14913 New Material Requisition To Resource Division RTOR000148/2023-2024 2155/BWD 10/05/2023 0 Resource Division 12.34 0.00 0 0
4628 PURBA BARDHAMAN Mangolkote Central Mechanical KUNDA PIPED WATER SUPPLY SCHEME , SM/14913 New New service connection charges of Kunda W/S Scheme TW-1 BILL/00689/2023-2024 BP-2023-24-34 26/06/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 2.56 0.00 0 0
4629 PURBA BARDHAMAN Mangolkote Central Mechanical KUNDA PIPED WATER SUPPLY SCHEME , SM/14913 New Supply & Installation of Submersible Pumping Machinery , Voltage Stabilizer, Chlorination system and internal House wiring for Tube well no.- 1 & 2 at KUNDA Water Supply Scheme [Block - MANGALKOTE] under CMD, PHE Dte., Dist.- Purba-Bardhaman. Driller In-Charge Junior Engineer ORD/000056/2023-2024 2518/CMD 02/06/2023 30 M/S. S.R. ENTERPRISE 21.04 9.94 47.24 40
4630 PURBA BARDHAMAN Mangolkote Central Mechanical KUNDA PIPED WATER SUPPLY SCHEME , SM/14913 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Jabagram & others water supply scheme under Mangalkote Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. Driller In-Charge Junior Engineer ORD/000118/2024-2025 2590/CMD 27/08/2024 90 M/S SAJAHAN CHOWDHURY 62.06 0.00 0 0
4631 PURBA BARDHAMAN Mangolkote Burdwan Division KUNDA PIPED WATER SUPPLY SCHEME , SM/14913 New KUNDA Piped Water Supply Scheme with sinking of Tube-well, LDS, Rising Main, FHTC, construction of switch rooms & boundary walls with gates and land development, drain and internal pathway at Brahmapur, Jartha village (J.L No -76, 75) under Mongolkote Block, District:- Purba-Bardhaman [NEW SCHEME]. Assistant Engineer JUNIOR ENGINEER R.W.S. BURDWAN SUB-DIVISION PHE DTE ORD/000775/2022-2023 1341/BWD 22/03/2023 90 KHEPIMA ENGINEERS CO. OPERATIVE SOCIETY LTD. 57.05 56.83 99.61 60
4632 PURBA BARDHAMAN Mangolkote Burdwan Division KUNDA PIPED WATER SUPPLY SCHEME , SM/14913 New KUNDA Piped Water Supply Scheme with balance LDS and FHTC at Kunda village, J.L No- 74 under Mongolkote Block, District:- Purba-Bardhaman. [NEW SCHEME]. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE,JUNIOR ENGINEER R.W.S. BURDWAN SUB-DIVISION PHE DTE ORD/000095/2023-2024 2232/BWD 16/05/2023 90 ASMA ENTERPRISE 32.47 32.16 99.05 35
4633 PURBA BARDHAMAN Mangolkote Burdwan Division KUNDA PIPED WATER SUPPLY SCHEME , SM/14913 New Material Requisition To Resource Division RTOR000813/2023-2024 302/BWD 24/01/2024 0 Resource Division 14.25 0.00 0 0
4634 PURBA BARDHAMAN Mangolkote Burdwan Division KUNDA PIPED WATER SUPPLY SCHEME , SM/14913 New Balance works for different type of works in connection with Jaggeswardihi PWSS, Deulia PWSS, Kunda PWSS and Gohagram PWSS Under Mongalkote Block within Katwa Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer JUNIOR ENGINEER KATWA SUB-DIVISION PHE DTE ORD/001186/2024-2025 593/BWD 07/02/2025 120 MD HASIN 203.38 0.00 0 20
4635 PURBA BARDHAMAN Burdwan Division Providing Functional House hold Tap Connection (FHTC) by retrofitting at Akhina , Baje Kowarpur, Binodpur, Dakshin Gopalpur, Dakshin Mohanpur and Pahalanpur mouzas within the command area of Chhotobainan piped Water Supply Scheme at Raina-II Block under B , SM/08699 Retrofitting Extension of pipeline for Chhotobainan water supply scheme at Pahalanpur and Rupsara village within Raina-II Block under Burdwan Division, PHE Dte.[Gr.-C] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000418/2021-2022 1119/BSD 24/08/2021 45 BOSE ENTERPRISE 4.67 2.43 52.03 1
4636 PURBA BARDHAMAN Burdwan Division Providing Functional House hold Tap Connection (FHTC) by retrofitting at Akhina , Baje Kowarpur, Binodpur, Dakshin Gopalpur, Dakshin Mohanpur and Pahalanpur mouzas within the command area of Chhotobainan piped Water Supply Scheme at Raina-II Block under B , SM/08699 Retrofitting Quotation of new connection charges of Chhotobainan water supply scheme under Burdwan Division, PHE Dte. [Application No.-5003481960, Ref ID-503178571], VCH/000593/2022-2023 709/DW/22-23 21/10/2022 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LTD. 3.37 0.00 0 0
4637 PURBA BARDHAMAN Burdwan Division Providing Functional House hold Tap Connection (FHTC) by retrofitting at Akhina , Baje Kowarpur, Binodpur, Dakshin Gopalpur, Dakshin Mohanpur and Pahalanpur mouzas within the command area of Chhotobainan piped Water Supply Scheme at Raina-II Block under B , SM/08699 Retrofitting Supply of materials for different water supply scheme under Burdwan Division, PHE Dte. VCH/001013/2021-2022 21/01/2022 0 EXECUTIVE ENGINEER, RESOURCES DIVISION, P.H.E. DTE. 617.98 0.00 0 0
4638 PURBA BARDHAMAN Burdwan Division Providing Functional House hold Tap Connection (FHTC) by retrofitting at Akhina , Baje Kowarpur, Binodpur, Dakshin Gopalpur, Dakshin Mohanpur and Pahalanpur mouzas within the command area of Chhotobainan piped Water Supply Scheme at Raina-II Block under B , SM/08699 Retrofitting Payment for supply of materials for different water supply scheme under Burdwan Division, PHE Dte. VCH/001045/2021-2022 934/DW 31/01/2022 0 EXECUTIVE ENGINEER, RESOURCES DIVISION, P.H.E. DTE. 617.98 0.00 0 0
4639 PURBA BARDHAMAN Burdwan Division Providing Functional House hold Tap Connection (FHTC) by retrofitting at Akhina , Baje Kowarpur, Binodpur, Dakshin Gopalpur, Dakshin Mohanpur and Pahalanpur mouzas within the command area of Chhotobainan piped Water Supply Scheme at Raina-II Block under B , SM/08699 Retrofitting Extension of pipeline with FHTC for CHHOTOBAINAN Piped Water Supply Scheme (Akina (P), Pahalanpur, Dakshin Gopalpur, Bajekumarpur, Binodpur, Momrejpur village) within Raina II Block under Burdwan Division, PHE. Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000032/2022-2023 2163/BWD 26/04/2022 45 BRINDABAN KONAR 71.69 56.07 78.21 1
4640 PURBA BARDHAMAN Burdwan Division Providing Functional House hold Tap Connection (FHTC) by retrofitting at Akhina , Baje Kowarpur, Binodpur, Dakshin Gopalpur, Dakshin Mohanpur and Pahalanpur mouzas within the command area of Chhotobainan piped Water Supply Scheme at Raina-II Block under B , SM/08699 Retrofitting Providing leftout water tap connection in different villages for 100% coverage to make it Sajal Gram from existing distribution system within scheme jurisdiction of different Piped Water Supply Schemes within Raina ¿ II Block under Burdwan Division, PHE. Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000390/2021-2022 269/BWD 14/01/2022 30 PRONAB KUMAR DEY 6.99 0.00 0 1
4641 PURBA BARDHAMAN Burdwan Division Providing Functional House hold Tap Connection (FHTC) by retrofitting at Akhina , Baje Kowarpur, Binodpur, Dakshin Gopalpur, Dakshin Mohanpur and Pahalanpur mouzas within the command area of Chhotobainan piped Water Supply Scheme at Raina-II Block under B , SM/08699 Retrofitting Sinking of additional 250 X 200mm dia Tube Well 150 mtr. Depth by D.R. Rig method using UPVC pipe (CD) and UPVC Deep Well Screen (RDS) for CHHOTOBAINAN Piped Water Supply Scheme, Block - Raina - II, Dist - Purba Bardhaman under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000055/2022-2023 2233/BWD 29/04/2022 30 J. K. CORPORATION 10.76 9.72 90.33 1
4642 PURBA BARDHAMAN Burdwan Division Providing Functional House hold Tap Connection (FHTC) by retrofitting at Akhina , Baje Kowarpur, Binodpur, Dakshin Gopalpur, Dakshin Mohanpur and Pahalanpur mouzas within the command area of Chhotobainan piped Water Supply Scheme at Raina-II Block under B , SM/08699 Retrofitting Construction of Pump House cum chlorine room without sanitary and water supply arrangement at 3rd Tube Well Site (Baje Kumarpur) to departmental drawing no-PHE/BD/P.H/DRG/02/DEC-17(Size 3.60 mtr x 3.00 mtr room) for Chhotobainan its Adjoining Mouza W/S Scheme, block -Raina-II within Burdwan Sub-Division, PHE Dte. Gr.B. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000469/2022-2023 1526/BSD 05/09/2022 60 BRINDABAN KONAR 3.03 2.60 85.81 1
4643 PURBA BARDHAMAN Burdwan Division Providing Functional House hold Tap Connection (FHTC) by retrofitting at Akhina , Baje Kowarpur, Binodpur, Dakshin Gopalpur, Dakshin Mohanpur and Pahalanpur mouzas within the command area of Chhotobainan piped Water Supply Scheme at Raina-II Block under B , SM/08699 Retrofitting Material Requisition To Resource Division RTOR000022/2021-2022 424/BWD 20/01/2022 0 Resource Division 5.50 0.00 0 0
4644 PURBA BARDHAMAN Central Mechanical AUGMENTATION OF RAYAN (PART-II) PWSS , SM/16486 Augmentation Supply & Installation of Submersible Pumping Machinery , Voltage Stabilizer, Chlorination system and internal House wiring for Tube well no.- 1&2 at Augumentation of Rayan Part - 2 Water Supply Scheme under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER Junior Engineer ORD/000091/2023-2024 2595/CMD 07/06/2023 30 P.K. ENGINEERING 24.20 0.00 0 0
4645 PURBA BARDHAMAN Central Mechanical AUGMENTATION OF RAYAN (PART-II) PWSS , SM/16486 Augmentation New service connection charges for Aug. Rayan PWSS TW-1 BILL/01424/2023-2024 BP-2023-24-151 05/09/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 5.11 0.00 0 0
4646 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF RAYAN (PART-II) PWSS , SM/16486 Augmentation Augmentation of RAYAN (PART-II) Piped Water Supply Scheme with sinking of Tube-well, LDS, Rising Main, FHTC, Construction of 500 cum capacity RCC OHR with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drain and internal pathway at different TW site under Burdwan -I Block, District:- Purba-Bardhaman. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000183/2024-2025 2377/BWD 25/06/2024 270 MATRI ENTERPRISE 697.52 0.00 0 0
4647 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF RAYAN (PART-II) PWSS , SM/16486 Augmentation Route Survey & Preparation of DPR for RAYAN -PART-II W/S Scheme under Burdwan-I Block under Burdwan Sub-Division under Burdwan Division PHE Dte. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000848/2024-2025 2585/BSD 26/11/2024 45 APEX ENGINEERING 2.95 0.00 0 0
4648 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF RAYAN (PART-II) PWSS , SM/16486 Augmentation Material Requisition To Resource Division RTOR000002/2024-2025 4101/BWD 25/11/2024 0 Resource Division 9.24 0.00 0 0
4649 PURBA BARDHAMAN Burdwan Division AUGUMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR RAMKRISHNAPUR , SM/15187 Augmentation Construction of 3.60 mtr x 3.0 mtr size Pump House cum chlorine room with sanitary and water supply arrangement at to departmental drawing for RAMKRISHNAPUR Water Supply Scheme within Burdwan Division, PHE Dte. Dist.-Purba Bardhaman. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000805/2023-2024 4821/BWD 08/11/2023 60 SK BADIUZZAMAL 4.32 0.00 0 0
4650 PURBA BARDHAMAN Burdwan Division AUGUMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR RAMKRISHNAPUR , SM/15187 Augmentation Extension Pipeline with Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of RAMKRISHNAPUR Piped Water Supply Scheme within Raina I Block of Burdwan Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000015/2023-2024 1730/BWD 13/04/2023 60 SUPRIYA RAY 40.13 20.84 51.93 45
4651 PURBA BARDHAMAN Burdwan Division AUGUMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR RAMKRISHNAPUR , SM/15187 Augmentation Designing, Making and Erection of Sign Board for SAJAL GRAM in Khemta Village, Raina - I Block within Ramkrishnapur PWSS under Burdwan Division, PHE Dte. (5 Nos Board) AE(HQs) J.E. 1 BURDWAN ORD/000798/2023-2024 877/AE/HQ 07/11/2023 30 PAPRI HAZRA 0.76 0.72 94.74 100
4652 PURBA BARDHAMAN Burdwan Division AUGUMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR RAMKRISHNAPUR , SM/15187 Augmentation Preparation and Submission of DPR for Augmentation of Ramkrishnapur PWSS under Raina-I Development Block under Burdwan Division, P.H.E Dte (2nd Call) Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/001224/2023-2024 2972/BSD 20/12/2023 15 GEO-SOLUTION 0.78 0.78 100 100
4653 PURBA BARDHAMAN Central Mechanical AUGUMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR RAMKRISHNAPUR , SM/15187 Augmentation NEW SERVICE CONNECTION FOR RAMKRISHNAPUR (AUGMENTATION) PWSS TW 03 BILL/00119/2024-2025 BP-2024-25-57 26/04/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.52 0.00 0 0
4654 PURBA BARDHAMAN Burdwan Division AUGUMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR RAMKRISHNAPUR , SM/15187 Augmentation Laying Parallel Pipeline to improve drinking water supply, Construction Path Way, Drain at different TW Site and providing leftout FHTC, Road Restoration with allied work for RAMKRISHNAPUR Piped Water Supply Scheme, Block- Raina-I, within Burdwan Sub Division under Burdwan Division PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000358/2024-2025 2913/BWD 25/07/2024 525 T.K. BANERJEE & CO. 26.89 0.00 0 70
4655 PURBA BARDHAMAN Central Mechanical AUGMENTATION BHALKI Z-I & Z-II PWSS , SM/15560 Augmentation New service connection charges for Bhalki PWSS TW-1 BILL/00786/2024-2025 BP-2024-25-298 17/09/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 2.63 0.00 0 0
4656 PURBA BARDHAMAN Central Mechanical AUGMENTATION BHALKI Z-I & Z-II PWSS , SM/15560 Augmentation Quotation for new service connection at Bhalki Zone-I/Zone-II, Aug-1. PWSS BILL/00897/2024-2025 BP-2024-25-337 04/10/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 4.77 0.00 0 0
4657 PURBA BARDHAMAN Central Mechanical AUGMENTATION BHALKI Z-I & Z-II PWSS , SM/15560 Augmentation Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination system and internal House wiring for Tube well no.- 1 & 2 at Augmentation of BHALKI (ZONE-I & II) [AUSGRAM-II] Water Supply Scheme under CMD, PHE Dte., Dist.- Purba-Bardhaman. Driller In-Charge Junior Engineer ORD/001088/2023-2024 4510/CMD 06/10/2023 726 C.M. ENTERPRISE 24.42 3.11 12.74 50
4658 PURBA BARDHAMAN Burdwan Division AUGMENTATION BHALKI Z-I & Z-II PWSS , SM/15560 Augmentation Aug. of BHALKI ZONE-I Piped Water Supply Scheme with Rising Main & Construction of 400 cum capacity RCC OHR with 20.0 mtr. with Staging height including soil investigation at Headwork TW site under Ausgram-II Block, District:- Purba-Bardhaman. Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/001014/2023-2024 474/BWD 05/02/2024 510 SK AFJAL RAHAMAN 114.56 0.00 0 25
4659 PURBA BARDHAMAN Burdwan Division AUGMENTATION BHALKI Z-I & Z-II PWSS , SM/15560 Augmentation Aug. of BHALKI ZONE-II Piped Water Supply Scheme with Rising Main & Construction of 200 cum capacity RCC OHR with 20.0 mtr. with Staging height including soil investigation at Headwork TW site under Ausgram-II Block, District:- Purba-Bardhaman. Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/001022/2023-2024 568/BWD 08/02/2024 360 SK ABDUL LALAN 74.12 0.00 0 0
4660 PURBA BARDHAMAN Katwa-I Burdwan Division GOPKHANJI PIPED WATER SUPPLY SCHEME , SM/15171 New Material Requisition To Resource Division RTOR000094/2022-2023 1962/BWD 25/04/2023 0 Resource Division 37.55 0.00 0 0
4661 PURBA BARDHAMAN Katwa-I Central Mechanical GOPKHANJI PIPED WATER SUPPLY SCHEME , SM/15171 New New service connection charges for Gopkhanji PWSS TW-2 BILL/00822/2023-2024 BP-2023-24-100 03/08/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 2.87 0.00 0 0
4662 PURBA BARDHAMAN Katwa-I Central Mechanical GOPKHANJI PIPED WATER SUPPLY SCHEME , SM/15171 New New service connection charges for Gopkhanji W/S Scheme TW-1 BILL/00696/2023-2024 BP-2023-24-39 27/06/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 4.65 0.00 0 0
4663 PURBA BARDHAMAN Katwa-I Burdwan Division GOPKHANJI PIPED WATER SUPPLY SCHEME , SM/15171 New GOPKHANJI Piped Water Supply Scheme with sinking of Tube-well, LDS, Rising Main, FHTC, Construction of 250 cum capacity RCC OHR with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drain and internal pathway at different TW site under KATWA -I Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer JUNIOR ENGINEER KATWA SUB-DIVISION PHE DTE ORD/000741/2022-2023 1134/BWD 13/03/2023 871 POWER TOOLS & ENGINEERING 482.85 232.66 48.18 74
4664 PURBA BARDHAMAN Katwa-I Burdwan Division GOPKHANJI PIPED WATER SUPPLY SCHEME , SM/15171 New Balance work for Balance work of OHR, construction Concrete Road, 1st Floor of Office Building, Functional Household Tap Connection, land development, Road restoration etc. of Gopekhanji, Jajigram & Gidhagram PWSS under KATWA -I Block, under Katwa Sub Division under Burdwan Divn, District:- Purba-Bardhaman. Assistant Engineer ORD/000503/2024-2025 3161/BWD 22/08/2024 120 POWER TOOLS & ENGINEERING 272.54 0.00 0 0
4665 PURBA BARDHAMAN Katwa-I Central Mechanical GOPKHANJI PIPED WATER SUPPLY SCHEME , SM/15171 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Jajigram & others water supply scheme under Katwa-I Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman Driller In-Charge Junior Engineer ORD/000069/2024-2025 2399/CMD 02/08/2024 90 SUBRATA BHADRA 55.16 0.00 0 0
4666 PURBA BARDHAMAN Katwa-I Central Mechanical GOPKHANJI PIPED WATER SUPPLY SCHEME , SM/15171 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at GOPKHANJI Water Supply Scheme [ Block- KATWA-1] under CMD, PHE Dte., Dist.- Purba-Bardhaman. Driller In-Charge Junior Engineer ORD/000127/2023-2024 2660/CMD 16/06/2023 30 JYOTY SOLAR POWER. 26.98 21.81 80.84 100
4667 PURBA BARDHAMAN Katwa-I Central Mechanical GOPKHANJI PIPED WATER SUPPLY SCHEME , SM/15171 New Supply and installation of Electro-Magnetic flow meter at HARIGRAM, KUCHUT & others water supply scheme under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. ASSISTANT ENGINEER Junior Engineer ORD/000564/2024-2025 3103/CMD 11/12/2024 60 S DUTTA 15.06 0.00 0 0
4668 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR LOHAI , SM/15565 Augmentation Construction of Boundary wall at Head Works Site of LOHAI Water Supply scheme under RAINA-II Block of Burdwan Division, PHE Dte. (Length -190.00 Mtr, Col-60 Nos). Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000078/2023-2024 2053/BWD 04/05/2023 60 S. MITRA & CO. 20.43 0.00 0 0
4669 PURBA BARDHAMAN Central Mechanical AUGMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR LOHAI , SM/15565 Augmentation Supply & Installation of Submersible Pumping Machinery , Voltage Stabilizer, Chlorination system and internal House wiring for Tube well no.- 1 at Augumentation of Lohai Water Supply Scheme under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000086/2023-2024 2592/CMD 07/06/2023 30 SOUVIK HALDER 11.36 0.00 0 0
4670 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR LOHAI , SM/15565 Augmentation Extension Pipeline with Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of LOHAI Piped Water Supply Scheme within Raina II Block of Burdwan Sub-Division under Burdwan Division, PHE Dte._2ND CALL Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000149/2023-2024 2422/BWD 30/05/2023 30 JAI MAA DURGA & CO. 19.37 5.31 27.41 50
4671 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR LOHAI , SM/15565 Augmentation Preparation and Submission of DPR for Augmentation of Lohai PWSS under Raina-II Development Block under Burdwan Division, P.H.E Dte (2nd Call) Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/001225/2023-2024 2973/BSD 20/12/2023 15 MEASURE LAND 0.78 0.78 100 100
4672 PURBA BARDHAMAN Central Mechanical AUGMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR LOHAI , SM/15565 Augmentation Making illumination arrangement and mise works at LOHAI water supply scheme RAINA-II BLOCK under Central Mechanical Division P.H.E. Dte. Purba-Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000471/2024-2025 2953/CMD 20/11/2024 60 M/S GHOSH ENTERPRISE 9.84 0.00 0 60
4673 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF PURBASTHALI SURFACE WATER BASED PWSS ZONE I , SM/15571 Augmentation Material Requisition To Resource Division RTOR000516/2023-2024 3970/BWD 08/09/2023 0 Resource Division 18.33 0.00 0 0
4674 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF PURBASTHALI SURFACE WATER BASED PWSS ZONE I , SM/15571 Augmentation Work order for "Route Survey & Preparation of DPR for Augmentation of Purbasthali Surface Water Based PWSS Zone-I (Zone-1A) (SM/15571) under Kalna Sub-Division under Burdwan Division, PHE Dte." (SL-6) Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/001139/2023-2024 2081/KSD 29/02/2024 45 APEX ENGINEERING 2.23 0.00 0 100
4675 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF PURBASTHALI SURFACE WATER BASED PWSS ZONE I , SM/15571 Augmentation Material Requisition To Resource Division RTOR000761/2023-2024 202/BWD 10/01/2024 0 Resource Division 6.16 0.00 0 0
4676 PURBA BARDHAMAN Central Mechanical AUGMENTATION OF PURBASTHALI SURFACE WATER BASED PWSS ZONE I , SM/15571 Augmentation Quotation for meter shifting at Purbasthali PWSS PH 1. BILL/00935/2024-2025 BP-2024-25-409 11/12/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 0.05 0.00 0 0
4677 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF PURBASTHALI SURFACE WATER BASED PWSS ZONE I , SM/15571 Augmentation Augmentation of PURBASTHALI Surface Water Supply Scheme (ZONE-1A) with LDS, Rising Main, FHTC, Construction of 250 cum capacity RCC OHR with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drain and internal pathway at different TW site including laying of Rising Main from Kamalnagar WTP to additional OHR and interconnection Old & New OHR under Purbasthali-II Block, District:- Purba-Bardhaman. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000426/2023-2024 3329/BWD 02/08/2023 970 MANASH GHOSH 513.64 264.77 51.55 20
4678 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF PURBASTHALI SURFACE WATER BASED PWSS ZONE I , SM/15571 Augmentation Different types of works involve in connection with Augmentation of KRISHNABATI (SM/07827), PURBASTHLI (SM/07866), SINHARI (SM/09716) & SURFACE based W/S Scheme (SM/15571) Piped water supply scheme under Purbasthali-II Block, Kalna Sub-Division, PHE Dte. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000181/2024-2025 2296/BWD 20/06/2024 616 M/S DATTA ENTERPRISE 579.85 0.00 0 2
4679 PURBA BARDHAMAN Central Mechanical AUGMENTATION OF PURBASTHALI SURFACE WATER BASED PWSS ZONE I , SM/15571 Augmentation Supply and installation of disinfection arrangement (Gaseous Chlorination) and other works at different OHR sites of Aug. of Purbasthali Surface Water Based PWSS Zone-I under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000008/2025-2026 1031/CMD 25/04/2025 30 EASTERN INDIA SALES & SERVICE 147.66 0.00 0 0
4680 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF PURBASTHALI SURFACE WATER BASED PWSS ZONE I , SM/15571 Augmentation Supply & Laying of 300mm Dia M.S.E.R.W Pipe including Jack Pushing along with other allied work in connection with different Augmentation & New [(SM/18439, SM/14437, SM/14435, SM/07805, SM/14440, SM/15571, SM/08030, SM/16014, SM/15588, SM/16298 & SM/16307)] under Kalna Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/001187/2024-2025 608/BWD 11/02/2025 361 MANASH GHOSH 1,209.62 0.00 0 51
4681 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Ruppur Piped Water Supply Scheme at Jamalpur Block , SM/07778 Retrofitting Extensionof pipe linefor providing functional house hold tap connection at Ruppur village(Habitation)of RUPPUR Piped Water Supply Scheme Piped Water Supply Scheme within Burdwan Sub-Division under Burdwan Division,PHE Dte".Gr.B. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. Junior Engineer, R.W.S. Burdwan Sub Division, P.H.E. Dt ORD/000474/2021-2022 275/BSD 15/02/2022 30 SAMANTA CONSTRUCTION 4.82 4.74 98.34 1
4682 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Ruppur Piped Water Supply Scheme at Jamalpur Block , SM/07778 Retrofitting Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of Ruppur Piped Water Supply Scheme at Ruppur Village (6 Nos. habitations), Biswambharpur Village & Dhuluk Village (6 Nos. habitations) Jamalpur Block under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. Junior Engineer, R.W.S. Burdwan Sub Division, P.H.E. Dt ORD/000041/2021-2022 3446/BWD 29/06/2021 60 NATIONAL CONSTRUCTION 87.06 84.90 97.52 1
4683 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF PURBASTHALI SURFACE WATER BASED PWSS ZONE IV , SM/16307 Augmentation Material Requisition To Resource Division RTOR000518/2023-2024 3968/BWD 08/09/2023 0 Resource Division 28.36 0.00 0 0
4684 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF PURBASTHALI SURFACE WATER BASED PWSS ZONE IV , SM/16307 Augmentation Work Order for "Route Survey & Preparation of DPR for Augmentation of Purbasthali Surface Water Based PWSS Zone-IV (Zone-IV B) (SM/16307) under Kalna Sub-Division under Burdwan Division, PHE Dte." Sl-3 Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/001136/2023-2024 2071/KSD 29/02/2024 45 APEX ENGINEERING 2.53 0.00 0 100
4685 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF PURBASTHALI SURFACE WATER BASED PWSS ZONE IV , SM/16307 Augmentation Work order for "Route Survey & Preparation of DPR for Augmentation of Purbasthali Surface Water Based PWSS Zone-IV (Zone-IV A) (SM/16307) under Kalna Sub-Division under Burdwan Division, PHE Dte." (SL-5) Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/001138/2023-2024 2080/KSD 29/02/2024 45 APEX ENGINEERING 2.27 0.00 0 100
4686 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF PURBASTHALI SURFACE WATER BASED PWSS ZONE IV , SM/16307 Augmentation Material Requisition To Resource Division RTOR000764/2023-2024 203/BWD 10/01/2024 0 Resource Division 6.16 0.00 0 0
4687 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF PURBASTHALI SURFACE WATER BASED PWSS ZONE IV , SM/16307 Augmentation Augmentation of PURBASTHALI Surface Water Supply Scheme (ZONE-4A) with LDS, Rising Main, FHTC, Construction of 250 cum capacity RCC OHR with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drain and internal pathway at different TW site under Purbasthali-II Block, District:- Purba-Bardhaman. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000385/2023-2024 3137/BWD 20/07/2023 730 SAKTI ENTERPRISE 432.83 122.14 28.22 1
4688 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF PURBASTHALI SURFACE WATER BASED PWSS ZONE IV , SM/16307 Augmentation Different types of works involve in connection with Augmentation of KRISHNABATI (SM/07827), PURBASTHLI (SM/07866), SINHARI (SM/09716) & SURFACE based W/S Scheme (SM/15571) Piped water supply scheme under Purbasthali-II Block, Kalna Sub-Division, PHE Dte. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000181/2024-2025 2296/BWD 20/06/2024 616 M/S DATTA ENTERPRISE 579.85 0.00 0 2
4689 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF PURBASTHALI SURFACE WATER BASED PWSS ZONE IV , SM/16307 Augmentation Supply & Laying of 300mm Dia M.S.E.R.W Pipe including Jack Pushing along with other allied work in connection with different Augmentation & New [(SM/18439, SM/14437, SM/14435, SM/07805, SM/14440, SM/15571, SM/08030, SM/16014, SM/15588, SM/16298 & SM/16307)] under Kalna Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/001187/2024-2025 608/BWD 11/02/2025 361 MANASH GHOSH 1,209.62 0.00 0 51
4690 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF RAHATPUR PIPED WATER SUPPLY SCHEME , SM/16306 Augmentation Different Types of work involved in connection with Augmentation of RAHATPUR (SM/16306) & LAKSHMANPUR (SM/13493) Piped water supply scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000176/2024-2025 2069/BWD 07/06/2024 240 SAIKAT RAY 213.73 0.00 0 2
4691 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF RAHATPUR PIPED WATER SUPPLY SCHEME , SM/16306 Augmentation Augmentation of RAHATPUR PWSS to accommodate FHTC, Laying Distribution System, Laying Rising Main, under Jal Jeevan Mission of Purbasthali - I Block, Purba Burdwan District under Burdwan Division, PHE. Dte. ORD/000084/2023-2024 2114/BWD 10/05/2023 60 BARDHAMAN AQUA ENGINEERING 18.67 17.56 94.05 100
4692 PURBA BARDHAMAN Central Mechanical AUGMENTATION OF RAHATPUR PIPED WATER SUPPLY SCHEME , SM/16306 Augmentation Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination system and internal House wiring for Tube well no.- 1 & 2 at Augmentation of RAHATPUR[PURBASTHALI-I] Water Supply Scheme under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/001083/2023-2024 4474/CMD 05/10/2023 580 S.K. ELECTRICALS 23.71 0.00 0 100
4693 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR GOBINDAPUR , SM/15722 Augmentation Preparation and Submission of DPR for Augmentation of Gobindapur PWSS under Memari-I Development Block under Burdwan Division, P.H.E Dte.[2nd Call] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000366/2023-2024 1529/BSD 17/07/2023 15 CARTO 0.78 0.77 98.72 100
4694 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR GOBINDAPUR , SM/15722 Augmentation Extension of PVC water supply line for GOBINDAPUR and its adjoining Mouza W/S Scheme, Block-Memari-I within Burdwan Sub-Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. Junior Engineer, RWS, Memari-I Dev. Bolck ORD/000623/2023-2024 3920/BWD 05/09/2023 30 J K CORPORATION 27.92 23.56 84.38 98
4695 PURBA BARDHAMAN Central Mechanical AUGMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR GOBINDAPUR , SM/15722 Augmentation Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.- 4 at Augmentation of GOBINDAPUR Water Supply Scheme [BLOCK- MEMARI-I] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER Junior Engineer ORD/001610/2023-2024 1538/CMD 05/03/2024 60 BEHERA ENTERPRISE 12.33 0.00 0 0
4696 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR GOBINDAPUR , SM/15722 Augmentation Designing, making and erection of Sign Board for SWAJAL GRAM in Ichhabacha village of Memari-I Block under Gobindapur Piped Water Supply Scheme within Burdwan Sub-Division under Burdwan Division,PHE Dte(5 nos Board) Junior Engineer, RWS, Memari-I Dev. Bolck ORD/000473/2025-2026 2338/BSD 21/08/2025 10 RAJ-N-MAHARAJ MANPOWER & SECURITY SOLUTIONS 0.72 0.00 0 0
4697 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF TALIT-SIMDAL PWSS (PART-B) , SM/18112 Augmentation Construction of Pump House cum chlorine room without sanitary and water supply arrangement at Tube Well Site to departmental drawing no-PHE/BD/P.H/DRG/02/DEC-17 (Size 3.60 mtr x 3.00 mtr room) for TALIT its Adjoining Mouza W/S Scheme, Block -Bardhaman-I within Burdwan Sub-Division, PHE Dte. (Mouza- TALIT) Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000838/2022-2023 500/BSD 21/03/2023 45 MAHAKE CONTRACTOR & GENERAL ORDER SUPPLIERS 3.16 2.59 81.96 100
4698 PURBA BARDHAMAN Central Mechanical AUGMENTATION OF TALIT-SIMDAL PWSS (PART-B) , SM/18112 Augmentation New service connection charges for Aug. Talit-Simdal PWSS TW-3 BILL/00758/2023-2024 BP-2023-24-58 17/07/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 1.36 0.00 0 0
4699 PURBA BARDHAMAN Central Mechanical AUGMENTATION OF TALIT-SIMDAL PWSS (PART-B) , SM/18112 Augmentation Illumination arrangement & different electro-mechanical works at TALIT SIMDAL water supply scheme under Bardhaman-I Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. ASSISTANT ENGINEER Junior Engineer ORD/000480/2024-2025 2957/CMD 20/11/2024 60 SUDIKSHA CONSTRUCTION 17.91 0.00 0 0
4700 PURBA BARDHAMAN Central Mechanical AUGMENTATION OF TALIT-SIMDAL PWSS (PART-B) , SM/18112 Augmentation Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination system and internal House wiring for Tube well no.- 1 & 2 at Augmentation of TALIT SIMDAL( Part-B)[BURDWAN-I] Water Supply Scheme under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER Junior Engineer ORD/000570/2023-2024 3900/CMD 18/08/2023 30 CINZANO 22.41 10.54 47.03 100
4701 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF TALIT-SIMDAL PWSS (PART-B) , SM/18112 Augmentation Different type of works related (Drain, Internal pathways, Land-Development, repair of boundary wall & pump houses (3 Nos), Repair of old OHR and road restoration) under Dewandighi & Talit Simdal PWSS under Burdwan-I Block under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JE (RWS) Burdwan-I Block,Junior Engineer, Burdwan Sadar Sub-Division ORD/000853/2024-2025 4139/BWD 27/11/2024 278 SANDIP SARKAR 12.10 0.00 0 85
4702 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF TALIT-SIMDAL PWSS (PART-B) , SM/18112 Augmentation Balance Work for extension of pipe lines to provide FHTC With Sinking of Tub well , Construction of pump house with Boundary wall & other related work for TALIT-SIMDAL (SM/18112), NABABHAT (SM-15166) and DEWANDIGHI-MIRJAPUR (SM/09494) PWSS under Burdwan Sub-Div., Block -Bwn-1, under Burdwan Division PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/001248/2024-2025 793/BWD 03/03/2025 120 M/S S.S. ENTERPRISE 227.66 0.00 0 0
4703 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF TALIT-SIMDAL PWSS (PART-B) , SM/18112 Augmentation Continuation for the work of Supply of one No. Diesel Driven Car (other than Ambasader) on hire basis for the office of the Assistant Engineer, RWS Burdwan Sub-Division, PHE Dte. (Period from 01-03-2025 to 30-04-2025) ASSISTANT ENGINEER R.W.S. BURDWAN SUB-DIVISION PHE DTE Contractual Junior Engineer ORD/001236/2024-2025 68/RWS 28/02/2025 61 MD HASIN 0.80 0.00 0 0
4704 PURBA BARDHAMAN Katwa-I Burdwan Division NANAGAR PIPED WATER SUPPLY SCHEME , SM/18479 New Material Requisition To Resource Division RTOR000350/2023-2024 2197/BWD 12/05/2023 0 Resource Division 11.62 0.00 0 0
4705 PURBA BARDHAMAN Katwa-I Burdwan Division NANAGAR PIPED WATER SUPPLY SCHEME , SM/18479 New Material Requisition To Resource Division RTOR000561/2023-2024 4935/BWD 10/11/2023 0 Resource Division 56.21 0.00 0 0
4706 PURBA BARDHAMAN Katwa-I Central Mechanical NANAGAR PIPED WATER SUPPLY SCHEME , SM/18479 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1, 2 & 3 at NANAGAR Water Supply Scheme [ Block- KATWA-1 ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. Driller In-Charge Junior Engineer ORD/000878/2023-2024 4141/CMD 29/08/2023 30 S.P. CONSTRUCTION 44.39 13.05 29.4 30
4707 PURBA BARDHAMAN Katwa-I Central Mechanical NANAGAR PIPED WATER SUPPLY SCHEME , SM/18479 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Jajigram & others water supply scheme under Katwa-I Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman Driller In-Charge Junior Engineer ORD/000069/2024-2025 2399/CMD 02/08/2024 90 SUBRATA BHADRA 55.16 0.00 0 0
4708 PURBA BARDHAMAN Katwa-I Burdwan Division NANAGAR PIPED WATER SUPPLY SCHEME , SM/18479 New Balance work of OHR, construction Concrete Road, Functional Household Tap Connection, Road restoration etc. for Nanagar PWSS, Srikhanda PWSS, under KATWA -I Block under Katwa Sub-Divn under Burdwan Division, PHE Dte. District:- Purba-Bardhaman. Assistant Engineer ORD/000685/2024-2025 3655/BWD 21/10/2024 120 HAMID SK 121.69 0.00 0 0
4709 PURBA BARDHAMAN Katwa-I Central Mechanical NANAGAR PIPED WATER SUPPLY SCHEME , SM/18479 New ADDITIONAL QUOTATION NEW SERVICE CONNECTION FOR NANAGAR PWSS TW -1. BILL/03104/2023-2024 BP-2023-24-644 15/03/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 1.02 0.00 0 0
4710 PURBA BARDHAMAN Katwa-I Central Mechanical NANAGAR PIPED WATER SUPPLY SCHEME , SM/18479 New NEW SERVICE CONNECTION FOR NANAGAR PWSS TW-2 BILL/00130/2024-2025 BP-2024-25-59 26/04/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 8.11 0.00 0 0
4711 PURBA BARDHAMAN Katwa-I Central Mechanical NANAGAR PIPED WATER SUPPLY SCHEME , SM/18479 New New service connection for NANAGAR PWSS PH-1. BILL/02285/2023-2024 BP-2023-24-416 19/01/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 2.83 0.00 0 0
4712 PURBA BARDHAMAN Katwa-I Central Mechanical NANAGAR PIPED WATER SUPPLY SCHEME , SM/18479 New Second time additional quotation for Nanagar PWSS TW-1 BILL/00665/2024-2025 BP-2024-25-267 20/08/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 0.34 0.00 0 0
4713 PURBA BARDHAMAN Katwa-I Burdwan Division NANAGAR PIPED WATER SUPPLY SCHEME , SM/18479 New NANAGAR Piped Water Supply Scheme with sinking of Tube-well, LDS, Rising Main, FHTC, Construction of 400 cum capacity RCC OHR with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drain and internal pathway at different TW site under Katwa-I Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer Junior Engineer, R.W.S., Katwa-I Dev. Block ORD/000490/2023-2024 3507/BWD 10/08/2023 875 GUPTA ENTERPRISE 660.65 137.26 20.78 75
4714 PURBA BARDHAMAN Burdwan Division Regular Monitoring of Drinking Water Testing Laboratories Related to Water Quality Monitoring & Surveillance under Jal Jeevan Mission , SM/19288 Support-WQMSP Continuation work order for Maintenance in Ketugram Sub District Water Testing Laboratory within Katwa sub Division under Burdwan Division, PHE Dte., Purba Bardhaman. [01.08.2025 to 31.03.2026] ORD/000630/2025-2026 1772/KTS 31/07/2025 243 JAGADHATRI CONSTRUCTION AND BUILDERS 0.56 0.00 0 0
4715 PURBA BARDHAMAN Burdwan Division Regular Monitoring of Drinking Water Testing Laboratories Related to Water Quality Monitoring & Surveillance under Jal Jeevan Mission , SM/19288 Support-WQMSP Continuation work for Supply of Residual Chlorine Kit and engagement of Laboratory personnel (Chemist/Bacteriologist/ Lab Assistant and Sampling Assistant) including maintenance in 4 Nos. Sub District Laboratories within Kalna Sub Division under Burdwan Division, PHE Dte., Purba Bardhaman. [Period For Six Months] i.e. period from 01.08.2025 to 31.01.2026. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000427/2025-2026 2227/BWD 01/08/2025 184 DULAL MAJUMDER 20.51 0.00 0 0
4716 PURBA BARDHAMAN Burdwan Division Regular Monitoring of Drinking Water Testing Laboratories Related to Water Quality Monitoring & Surveillance under Jal Jeevan Mission , SM/19288 Support-WQMSP Continuation work for Supply of Residual Chlorine Kit and engagement of Laboratory personnel (Chemist/Bacteriologist/ Lab Assistant and Sampling Assistant) including maintenance in 2 Nos. Sub District Laboratories within Burdwan Sadar sub Division under Burdwan Division, PHE Dte., Purba Bardhaman. [Period from 01.08.2025 to 31.01.2026] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000324/2025-2026 2192/BWD 01/08/2025 184 BHARATI CHEMICAL AND SCIENTIFIC WORKS 9.73 0.00 0 0
4717 PURBA BARDHAMAN Burdwan Division Regular Monitoring of Drinking Water Testing Laboratories Related to Water Quality Monitoring & Surveillance under Jal Jeevan Mission , SM/19288 Support-WQMSP Continuation work for Engagement of laboratory personnels i.e. Chemist (One Person), Additional Chemist (One person), Bacteriologist (One Person), Laboratory Assistant (One Person), Sampling Assistant (One Person) and Computer Operator/Data Entry Operator (One Person) for Burdwan District Laboratory under Burdwan Division P.H.E Dte. at PHE Complex, Nababhat, Purba Bardhaman. [Period for 3 (Three) Months i.e. 01.09.2025 to 30.11.2025] ASSISTANT ENGINEER R.W.S. BURDWAN SUB-DIVISION PHE DTE ORD/000610/2025-2026 2485/BWD 01/09/2025 91 ALAKA GHOSH 4.19 0.00 0 0
4718 PURBA BARDHAMAN Burdwan Division Regular Monitoring of Drinking Water Testing Laboratories Related to Water Quality Monitoring & Surveillance under Jal Jeevan Mission , SM/19288 Support-WQMSP Continuation work order for Engagement of Laboratory personnel (Chemist/Bacteriologist/ Lab Assistant in 1 No. Ketugram Sub District Water Testing Laboratory within Katwa sub Division under Burdwan Division, PHE Dte., Purba Bardhaman. [Period For 01.08.2025 to 31.12.2025] ORD/000517/2025-2026 1773/KTS 31/07/2025 153 JAGADHATRI CONSTRUCTION AND BUILDERS 2.94 0.00 0 0
4719 PURBA BARDHAMAN Burdwan Division Regular Monitoring of Drinking Water Testing Laboratories Related to Water Quality Monitoring & Surveillance under Jal Jeevan Mission , SM/19288 Support-WQMSP Continuation work for Supply of Residual Chlorine Kit and engagement of Laboratory personnel (Chemist/Bacteriologist/ Lab Assistant and Sampling Assistant) including maintenance in 3 Nos. Sub District Laboratories within Headquarters under Burdwan Division, PHE Dte., Purba Bardhaman. [Period from 01.08.2025 to 31.01.2026] AE(HQs), Burdwan Division, PHE Dte. ORD/000600/2025-2026 2191/BWD 01/08/2025 184 BHARATI CHEMICAL AND SCIENTIFIC WORKS 15.06 0.00 0 0
4720 PURBA BARDHAMAN Burdwan Division IEC Activities related to judicious & safe use of drinking water, water conservation, water quality issues under JJM support activities , SM/19094 Support-IEC Organize one day Sub Division level orientation programme on JJM at involving PRI Functionaries and VWSC members at Purba Bardhaman and Conceptualization, design, implementing implementation of community sensitization / mobilization activities through Wall Painting on legal provision damage or illegal connection of PWSS; safe handling & storage of safe water Quality issues, water conservation and WASH related issues as per guideline of JJM at Purba Bardhaman under Burdwan Division, PHE Dte, Govt. of West Bengal. AE(HQs) J.E. 1 BURDWAN ORD/001050/2023-2024 788/BWD 27/02/2024 60 TUBGRAM GRAMMYAK UNNAYAN SAMITY 20.68 0.00 0 0
4721 PURBA BARDHAMAN Burdwan Division IEC Activities related to judicious & safe use of drinking water, water conservation, water quality issues under JJM support activities , SM/19094 Support-IEC Organize IEC activities and Block Level Orientation programme on JJM at Purba Bardhaman and Flex tagging(Scheme information), Wall Painting & Har Ghar Jal Logo , Light Board; Conceptualization, design and implementing mass awareness generation through Tableau & Miking, Local News Channel, Printing & Supply Of IEC Banner & leaflets by dissemination of awareness generation IEC messages regarding JJM/FHTC, Prevention of illegal connection or damages of PWSS; safe handling & storage of safe water Quality issues, water conservation and wash related issues as per guideline of JJM in different place of Gram Panchayets. AE(HQs),Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000427/2024-2025 3056/BWD 06/08/2024 60 TUBGRAM GRAMMYAK UNNAYAN SAMITY 30.40 30.40 100 100
4722 PURBA BARDHAMAN Burdwan Division IEC Activities related to judicious & safe use of drinking water, water conservation, water quality issues under JJM support activities , SM/19094 Support-IEC Arrangement of different items required in DWSM (District Water and Sanitation Mission) meeting and training program on "Good Chlorine Practice & Analysis of Chlorine Demand & Chlorine available in disinfectants" under Burdwan Division, P.H.E. Dte. AE(HQs) J.E. 1 BURDWAN ORD/000274/2024-2025 310/AE/HQ 10/06/2024 15 HAZRA COMPUTER 0.58 0.58 100 100
4723 PURBA BARDHAMAN Burdwan Division Annual Procurement of Chemicals, Consumables and Glassware for water testing Laboratories. , SM/06624 Support-WQMSP Procurement of consumables for OMAS for different Sub-District Laboratories under Burdwan Division, PHE Dte. [Gr.-A] AE(HQs) J.E. 2 BURDWAN ORD/000762/2020-2021 1265/AE/HQ 26/02/2021 7 SUNANDA ENVIROMENTAL INTERNATIONAL PVT LTD. 4.72 9.44 200 0
4724 PURBA BARDHAMAN Burdwan Division Annual Procurement of Chemicals, Consumables and Glassware for water testing Laboratories. , SM/06624 Support-WQMSP Supply & Delivery of Chemicals, reagents and consumables for 14 (Fourteen) Nos. laboratories under Burdwan Division, PHE Dte. (Tr No.-212/BWD/20-21) AE(HQs) J.E. 2 BURDWAN ORD/000057/2020-2021 3362/BWD 21/09/2020 20 NATURAL RESOURCES CONSORTIUM 25.22 50.45 200.04 0
4725 PURBA BARDHAMAN Burdwan Division Annual Procurement of Chemicals, Consumables and Glassware for water testing Laboratories. , SM/06624 Support-WQMSP Supply & Delivery of Chemicals, reagents and consumables for 14 (Fourteen) laboratories under Burdwan Division, P.H.E. Dte. AE(HQs) J.E. 2 BURDWAN ORD/000092/2021-2022 3468/BWD 29/06/2021 20 NATURAL RESOURCES CONSORTIUM 22.49 12.69 56.43 0
4726 PURBA BARDHAMAN Burdwan Division Annual Procurement of Chemicals, Consumables and Glassware for water testing Laboratories. , SM/06624 Support-WQMSP Supply & delivery of Residual Chlorine Kit and DPD Tablet for 14 (Fourteen) Nos Laboratories under Burdwan Division, PHE Dte.[Gr.-B] AE(HQs) J.E. 2 BURDWAN ORD/000151/2021-2022 1579/AE/HQ 14/07/2021 7 COMPUTER MEDIA 4.22 8.43 199.76 0
4727 PURBA BARDHAMAN Burdwan Division Consultancy Service for making DPR to implement New Piped Water Supply Scheme (MVS) within the Purba Bardhaman District. , SM/11993 Support-M&E Preparation & Submission of DPR for New Water Supply Scheme under JAMALPUR Development Block under Burdwan Division, P.H.E. Dte. [Gr. A] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000463/2022-2023 3901/BWD 08/09/2022 45 APEX ENGINEERING 8.83 6.18 69.99 0
4728 PURBA BARDHAMAN Burdwan Division Consultancy Service for making DPR to implement New Piped Water Supply Scheme (MVS) within the Purba Bardhaman District. , SM/11993 Support-M&E Preparation of piped network system & design the same including Route Survey using DGPS & all related field work for technical data and JJM compliant data collection preparation and supply of Geo reference drawing (CAD-GIS) layout of plan of the zone wise command area of water distribution and transmission network (WD & TN) Showing all requisite design physical features including cost and estimate of different real component of PWSS like OHR, TW,PUMP HOUSE, B/W electronica component etc. including preparation and submission of DPR booklet of PWSS all complete in consultation with PHED Planning Wings and clearance from SLSSC including preparation of bid documents in different PWSS of uncovered area within Mongalkote Dev. Block under Katwa Sub-Division under Purba Bardhaman. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000488/2022-2023 3931/BWD 09/09/2022 60 RUDRABHISHEK ENTERPRISES LIMITED 90.00 88.45 98.28 0
4729 PURBA BARDHAMAN Burdwan Division Consultancy Service for making DPR to implement New Piped Water Supply Scheme (MVS) within the Purba Bardhaman District. , SM/11993 Support-M&E Preparation of piped network system & design the same including Route Survey using DGPS & all related field work for technical data and JJM compliant data collection preparation and supply of Geo reference drawing (CAD-GIS) layout of plan of the zone wise command area of water distribution and transmission network (WD & TN) Showing all requisite design physical features including cost and estimate of different real component of PWSS like OHR, TW, PUMP HOUSE, B/W electronica component etc. including preparation and submission of DPR booklet of PWSS all complete in consultation with PHED Planning Wings and clearance from SLSSC including preparation of bid documents in different PWSS of uncovered area within Ausgram II, Galsi I & Bhatar Dev. Block under Durgapur (Burdwan North) Sub-Division under Purba Bardhaman. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000471/2022-2023 3825/BWD 02/09/2022 60 SRIJAN ECOLOGICAL UPLIFTMENT PVT LTD. 225.00 221.17 98.3 0
4730 PURBA BARDHAMAN Burdwan Division Consultancy Service for making DPR to implement New Piped Water Supply Scheme (MVS) within the Purba Bardhaman District. , SM/11993 Support-M&E Preparation & Submission of DPR for New Water Supply Scheme under KETUGRAM - I Development Block under Burdwan Division, P.H.E. Dte. [Gr. A] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000511/2022-2023 3972/BWD 13/09/2022 45 ENVIROTECH SOLUTIONS 60.07 54.11 90.08 0
4731 PURBA BARDHAMAN Burdwan Division Consultancy Service for making DPR to implement New Piped Water Supply Scheme (MVS) within the Purba Bardhaman District. , SM/11993 Support-M&E Preparation & Submission of DPR for New Water Supply Scheme under KETUGRAM - II Development Block under Burdwan Division, P.H.E. Dte. [Gr. B] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000512/2022-2023 3988/BWD 13/09/2022 45 ENVIROTECH SOLUTIONS 30.03 26.56 88.44 0
4732 PURBA BARDHAMAN Burdwan Division Consultancy Service for making DPR to implement New Piped Water Supply Scheme (MVS) within the Purba Bardhaman District. , SM/11993 Support-M&E Work Order for Service for land acquisition for different PWSS under JJM of Purbasthali-I block under Kalna Sub-Division, PHE Dte. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000341/2023-2024 519/KSD 06/06/2023 366 PARTHA PRATIM ACHARYA 0.81 0.81 100 100
4733 PURBA BARDHAMAN Burdwan Division Consultancy Service for making DPR to implement New Piped Water Supply Scheme (MVS) within the Purba Bardhaman District. , SM/11993 Support-M&E Work Order for Service for land acquisition for different PWSS under JJM of Monteswar block under Kalna Sub-Division, PHE Dte. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000343/2023-2024 535/KSD 07/06/2023 366 PARTHA PRATIM ACHARYA 0.81 0.33 40.74 42
4734 PURBA BARDHAMAN Burdwan Division Consultancy Service for making DPR to implement New Piped Water Supply Scheme (MVS) within the Purba Bardhaman District. , SM/11993 Support-M&E Preparation of piped network system & design the same including Route Survey using DGPS & all related field work for technical data and JJM compliant data collection preparation and supply of Geo reference drawing (CAD-GIS) layout of plan of the zone wise command area of water distribution and transmission network (WD & TN) Showing all requisite design physical features including cost and estimate of different real component of PWSS like OHR, TW, PUMP HOUSE, B/W electronica component etc. including preparation and submission of DPR booklet of PWSS all complete in consultation with PHED Planning Wings and clearance from SLSSC including preparation of bid documents in different PWSS of uncovered area within Burdwan II, Khandaghosh, Memari I & Raina II Dev. Block, under Burdwan Sub-Division under Purba Bardhaman. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000472/2022-2023 3841/BWD 05/09/2022 60 MARS PLANNING AND ENGINEERING SERVICES PVT LTD. 300.00 270.91 90.3 100
4735 PURBA BARDHAMAN Burdwan Division Consultancy Service for making DPR to implement New Piped Water Supply Scheme (MVS) within the Purba Bardhaman District. , SM/11993 Support-M&E Preparation of piped network system & design the same including Route Survey using DGPS & all related field work for technical data and JJM compliant data collection preparation and supply of Geo reference drawing (CAD-GIS) layout of plan of the zone wise command area of water distribution and transmission network (WD & TN) Showing all requisite design physical features including cost and estimate of different real component of PWSS like OHR, TW,PUMP HOUSE, B/W electronica component etc. including preparation and submission of DPR booklet of PWSS all complete in consultation with PHED Planning Wings and clearance from SLSSC including preparation of bid documents in different PWSS of uncovered area within Kalna I & Monteswar Dev. Block under Kalna Sub-Division under Purba Bardhaman. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000487/2022-2023 3956/BWD 09/09/2022 60 VENKATESHWARA ENTERPRISES 180.00 179.89 99.94 100
4736 PURBA BARDHAMAN Burdwan Division Consultancy Service for making DPR to implement New Piped Water Supply Scheme (MVS) within the Purba Bardhaman District. , SM/11993 Support-M&E Preparation & Submission of DPR for New Water Supply Scheme under PURBASTHALI - I Development Block under Burdwan Division, P.H.E. Dte. [Gr. C] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000513/2022-2023 4056/BWD 15/09/2022 45 ECO CARE 60.07 60.04 99.95 100
4737 PURBA BARDHAMAN Burdwan Division Consultancy Service for making DPR to implement New Piped Water Supply Scheme (MVS) within the Purba Bardhaman District. , SM/11993 Support-M&E Preparation & Submission of DPR for New Water Supply Scheme under PURBASTHALI - II Development Block under Burdwan Division, P.H.E. Dte. [Gr. D] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000514/2022-2023 4079/BWD 16/09/2022 45 ECO CARE 6.76 5.56 82.25 100
4738 PURBA BARDHAMAN Burdwan Division Consultancy Service for making DPR to implement New Piped Water Supply Scheme (MVS) within the Purba Bardhaman District. , SM/11993 Support-M&E Continuation Work for Preparation & Submission of DPR for New Water Supply Scheme under KETUGRAM - I Development Block under Burdwan Division, P.H.E. Dte. ORD/000920/2022-2023 4636/BWD 17/10/2022 45 ENVIROTECH SOLUTIONS 17.27 17.17 99.42 100
4739 PURBA BARDHAMAN Burdwan Division ADDITIONAL COST TOWARDS CONSULTANCY SERVICE FOR MAKING DPR TO IMPLEMENT NEW PIPED WATER SUPPLY SCHEME (MVS) WITHIN THE PURBA BARDHAMAN DISTRICT , SM/14441 Support-M&E Continuation work for Preparation of piped network system & design the same including Route Survey using DGPS & all related field work for technical data and JJM compliant data collection preparation and supply of Geo reference drawing (CAD-GIS) layout of plan of the zone wise command area of water distribution and transmission network (WD & TN) Showing all requisite design physical features including cost and estimate of different real component of PWSS like OHR, TW,PUMP HOUSE, B/W electronica component etc. including preparation and submission of DPR booklet of PWSS all complete in consultation with PHED Planning Wings and clearance from SLSSC including preparation of bid documents in different PWSS of uncovered area within Mongalkote Dev. Block under Katwa Sub-Division under Purba Bardhaman. Assistant Engineer JUNIOR ENGINEER KATWA SUB-DIVISION PHE DTE ORD/000727/2022-2023 341/BWD 27/01/2023 60 RUDRABHISHEK ENTERPRISES LIMITED 65.00 60.65 93.31 0
4740 PURBA BARDHAMAN Burdwan Division ADDITIONAL COST TOWARDS CONSULTANCY SERVICE FOR MAKING DPR TO IMPLEMENT NEW PIPED WATER SUPPLY SCHEME (MVS) WITHIN THE PURBA BARDHAMAN DISTRICT , SM/14441 Support-M&E Continuation work order for Preparation of piped network system & design the same including Route Survey using DGPS & all related field work for technical data and JJM compliant data collection preparation and supply of Geo reference drawing (CAD-GIS) layout of plan of the zone wise command area of water distribution and transmission network (WD & TN) Showing all requisite design physical features including cost and estimate of different real component of PWSS like OHR, TW, PUMP HOUSE, B/W electronica component etc. including preparation and submission of DPR booklet of PWSS all complete in consultation with PHED Planning Wings and clearance from SLSSC including preparation of bid documents in different PWSS of uncovered area within Ausgram I & II and Galsi I & II Dev. Block under Durgapur (Burdwan North) Sub-Division under Purba Bardhaman. ORD/000718/2022-2023 333/BWD 24/01/2023 60 SRIJAN ECOLOGICAL UPLIFTMENT PVT LTD. 170.00 169.01 99.42 0
4741 PURBA BARDHAMAN Burdwan Division ADDITIONAL COST TOWARDS CONSULTANCY SERVICE FOR MAKING DPR TO IMPLEMENT NEW PIPED WATER SUPPLY SCHEME (MVS) WITHIN THE PURBA BARDHAMAN DISTRICT , SM/14441 Support-M&E Continuation work for Preparation of piped network system & design the same including Route Survey using DGPS & all related field work for technical data and JJM compliant data collection preparation and supply of Geo reference drawing (CAD-GIS) layout of plan of the zone wise command area of water distribution and transmission network (WD & TN) Showing all requisite design physical features including cost and estimate of different real component of PWSS like OHR, TW, PUMP HOUSE, B/W electronica component etc. including preparation and submission of DPR booklet of PWSS all complete in consultation with PHED Planning Wings and clearance from SLSSC including preparation of bid documents in different PWSS of uncovered area within Burdwan ¿ I, Memari ¿ II & Raina ¿ I Dev. Block, under Burdwan Sub-Division under Purba Bardhaman. ORD/000725/2022-2023 334/BWD 24/01/2023 60 MARS PLANNING AND ENGINEERING SERVICES PVT LTD. 215.00 214.14 99.6 100
4742 PURBA BARDHAMAN Burdwan Division ADDITIONAL COST TOWARDS CONSULTANCY SERVICE FOR MAKING DPR TO IMPLEMENT NEW PIPED WATER SUPPLY SCHEME (MVS) WITHIN THE PURBA BARDHAMAN DISTRICT , SM/14441 Support-M&E Continuation work for Preparation of piped network system & design the same including Route Survey using DGPS & all related field work for technical data and JJM compliant data collection preparation and supply of Geo reference drawing (CAD-GIS) layout of plan of the zone wise command area of water distribution and transmission network (WD & TN) Showing all requisite design physical features including cost and estimate of different real component of PWSS like OHR, TW,PUMP HOUSE, B/W electronica component etc. including preparation and submission of DPR booklet of PWSS all complete in consultation with PHED Planning Wings and clearance from SLSSC including preparation of bid documents in different PWSS of uncovered area within Katwa I & II Dev. Block under Katwa Sub-Division under Purba Bardhaman. Assistant Engineer JUNIOR ENGINEER KATWA SUB-DIVISION PHE DTE ORD/000726/2022-2023 325/BWD 20/01/2023 60 VENKATESHWARA ENTERPRISES 175.00 169.73 96.99 100
4743 PURBA BARDHAMAN Burdwan Division ADDITIONAL COST TOWARDS CONSULTANCY SERVICE FOR MAKING DPR TO IMPLEMENT NEW PIPED WATER SUPPLY SCHEME (MVS) WITHIN THE PURBA BARDHAMAN DISTRICT , SM/14441 Support-M&E Continuation work for Preparation of piped network system & design the same including Route Survey using DGPS & all related field work for technical data and JJM compliant data collection preparation and supply of Geo reference drawing (CAD-GIS) layout of plan of the zone wise command area of water distribution and transmission network (WD & TN) Showing all requisite design physical features including cost and estimate of different real component of PWSS like OHR, TW,PUMP HOUSE, B/W electronica component etc. including preparation and submission of DPR booklet of PWSS all complete in consultation with PHED Planning Wings and clearance from SLSSC including preparation of bid documents in different PWSS of uncovered area within Kalna II Dev. Block under Kalna Sub-Division under Purba Bardhaman. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000731/2022-2023 342/BWD 27/01/2023 60 VENKATESHWARA ENTERPRISES 27.00 22.37 82.85 70
4744 PURBA BARDHAMAN Burdwan Division Survey and Water Sample Collection of Schools and Anganwari Centers through customised mobile application and data entry in IMIS within Purba Bardhaman District under Burdwan Division, PHE Dte. , SM/08997 Support-M&E Survey and Collection of data through mobile application regarding availability of drinking water, sanitation facilities and other parameters in Primary & Upper Primary Schools, Anganwadi Centers under Katwa -I , Katwa- II , Ketugram-I, Ketugram-II and Mongalkote Block within Purba Bardhaman District under Katwa Sub-Division under Burdwan Division, PHE Dte (Sl No-1) Assistant Engineer Junior Engineer, R.W.S., Katwa-I Dev. Block ORD/000968/2020-2021 314/A/KTS 09/11/2020 100 GHOSH CONSTRUCTION 2.47 2.47 100 0
4745 PURBA BARDHAMAN Burdwan Division Survey and Water Sample Collection of Schools and Anganwari Centers through customised mobile application and data entry in IMIS within Purba Bardhaman District under Burdwan Division, PHE Dte. , SM/08997 Support-M&E Survey and collection of data through mobile application regarding availability of drinking water, sanitation, facilities and other parameters in Primary & Upper Primary schools, Anganwari Centres under Burdwan-I, Burdwan-II, Raina-II, Memari-I, Memari-II, Jamalpur & Khandaghosh Block within Purba Bardhaman District under Burdwan Division, PHE Dte. ORD/000983/2020-2021 1031/BSD 13/11/2020 92 ALAKA GHOSH 3.27 2.34 71.56 0
4746 PURBA BARDHAMAN Burdwan Division Survey and Water Sample Collection of Schools and Anganwari Centers through customised mobile application and data entry in IMIS within Purba Bardhaman District under Burdwan Division, PHE Dte. , SM/08997 Support-M&E Survey and collection of data through mobile application regarding availability of drinking water, sanitation facilities and other parameters in Primary & Upper Primary schools, Anganwari Centres under Kalna-I, Kalna-II, Purbasthali-I, Purbasthali-II and Monteswar Block within Purba Bardhaman District under Burdwan Division, PHE Dte. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/001338/2020-2021 767/KSD 27/11/2020 100 SETH ENTERPRISE 1.46 1.46 100 0
4747 PURBA BARDHAMAN Burdwan Division Survey and Water Sample Collection of Schools and Anganwari Centers through customised mobile application and data entry in IMIS within Purba Bardhaman District under Burdwan Division, PHE Dte. , SM/08997 Support-M&E Designing, Making and Erection of Sign Board for SAJAL GRAM in Samaspur Village, Monteswar Block within Lohana PWSS under Burdwan Division, PHE Dte. (5 Nos Board) J.E. 1 BURDWAN ORD/001076/2023-2024 829/AE/HQ 30/10/2023 30 ISHAN CONSTRUCTION 0.76 0.72 94.74 100
4748 PURBA BARDHAMAN Burdwan Division Survey and Water Sample Collection of Schools and Anganwari Centers through customised mobile application and data entry in IMIS within Purba Bardhaman District under Burdwan Division, PHE Dte. , SM/08997 Support-M&E Designing, Making and Erection of Sign Board for SAJAL GRAM in Takipur Village, Ausgram-I Block within Takipur PWSS under Burdwan Division, PHE Dte. (5 Nos Board) J.E. 1 BURDWAN ORD/001077/2023-2024 824/AE/HQ 30/10/2023 30 ISHAN CONSTRUCTION 0.76 0.72 94.74 100
4749 PURBA BARDHAMAN Burdwan Division Survey and Water Sample Collection of Schools and Anganwari Centers through customised mobile application and data entry in IMIS within Purba Bardhaman District under Burdwan Division, PHE Dte. , SM/08997 Support-M&E Designing, Making and Erection of Sign Board for SAJAL GRAM in Chonari Village, Ausgram-I Block within Takipur PWSS under Burdwan Division, PHE Dte. (5 Nos Board) J.E. 1 BURDWAN ORD/001078/2023-2024 822/AE/HQ 30/10/2023 30 ISHAN CONSTRUCTION 0.76 0.72 94.74 100
4750 PURBA BARDHAMAN Burdwan Division Survey and Water Sample Collection of Schools and Anganwari Centers through customised mobile application and data entry in IMIS within Purba Bardhaman District under Burdwan Division, PHE Dte. , SM/08997 Support-M&E Designing, Making and Erection of Sign Board for SAJAL GRAM in Jarul Village, Khandaghosh Block within Taraposh PWSS under Burdwan Division, PHE Dte. (5 Nos Board) J.E. 1 BURDWAN ORD/001112/2023-2024 868/AE/HQ 07/11/2023 30 PAPRI HAZRA 0.76 0.72 94.74 100
4751 PURBA BARDHAMAN Burdwan Division Survey and Water Sample Collection of Schools and Anganwari Centers through customised mobile application and data entry in IMIS within Purba Bardhaman District under Burdwan Division, PHE Dte. , SM/08997 Support-M&E Designing, Making and Erection of Sign Board for SAJAL GRAM in Chalbalpur Village, Jamalpur Block within Chak Sanjadi PWSS under Burdwan Division, PHE Dte. (5 Nos Board) J.E. 1 BURDWAN ORD/001113/2023-2024 874/AE/HQ 07/11/2023 30 PAPRI HAZRA 0.76 0.72 94.74 100
4752 PURBA BARDHAMAN Burdwan Division Survey and Water Sample Collection of Schools and Anganwari Centers through customised mobile application and data entry in IMIS within Purba Bardhaman District under Burdwan Division, PHE Dte. , SM/08997 Support-M&E Designing, Making and Erection of Sign Board for SAJAL GRAM in Paschim Memari Village, Memari - I Block within Nabagram PWSS under Burdwan Division, PHE Dte. (5 Nos Board) AE(HQs) J.E. 1 BURDWAN ORD/001197/2023-2024 865/AE/HQ 06/11/2023 30 MANABSEBA PROKALPA & CONSTRUCTIONS 0.75 0.72 96 100
4753 PURBA BARDHAMAN Burdwan Division Survey and Water Sample Collection of Schools and Anganwari Centers through customised mobile application and data entry in IMIS within Purba Bardhaman District under Burdwan Division, PHE Dte. , SM/08997 Support-M&E Designing, Making and Erection of Sign Board for SAJAL GRAM in Pingur Village, Memari - I Block within Nabagram PWSS under Burdwan Division, PHE Dte. (5 Nos Board) AE(HQs) J.E. 1 BURDWAN ORD/001198/2023-2024 864/AE/HQ 06/11/2023 30 MANABSEBA PROKALPA & CONSTRUCTIONS 0.75 0.72 96 100
4754 PURBA BARDHAMAN Burdwan Division Survey and Water Sample Collection of Schools and Anganwari Centers through customised mobile application and data entry in IMIS within Purba Bardhaman District under Burdwan Division, PHE Dte. , SM/08997 Support-M&E Supply, fitting & fixing of Har Ghar Jal Logo and Wall painting of Scheme detailing of Nabagram & Kulingram Piped W/S. Scheme under Jamalpur Block under Burdwan Division, PHE. Dte. AE(HQs) J.E. 1 BURDWAN ORD/001200/2023-2024 912/AE/HQ 29/11/2023 10 MANABSEBA PROKALPA & CONSTRUCTIONS 1.00 1.00 100 100
4755 PURBA BARDHAMAN Burdwan Division Survey and Water Sample Collection of Schools and Anganwari Centers through customised mobile application and data entry in IMIS within Purba Bardhaman District under Burdwan Division, PHE Dte. , SM/08997 Support-M&E Designing, Making and Erection of Sign Board for SAJAL GRAM in Konarpara Village, Memari - I Block within Nabagram PWSS under Burdwan Division, PHE Dte. (5 Nos Board) AE(HQs) J.E. 1 BURDWAN ORD/001199/2023-2024 858/AE/HQ 06/11/2023 30 MANABSEBA PROKALPA & CONSTRUCTIONS 0.75 0.72 96 100
4756 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Continuation Work Order for Supply & delivery of Chemicals for Arsenic test through AAS at District Laboratories under Burdwan Division PHE Dte. [Group : A] AE(HQs) J.E. 2 BURDWAN ORD/000063/2022-2023 275/AE/HQ 10/05/2022 7 BHARATI CHEMICAL & SCIENTIFIC WORKS 3.09 0.00 0 0
4757 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Proposed extension, renovation and modification for NABL accreditation of SANKARI Sub District Laboratory under Burdwan Division P.H.E. Dte. Dist:Purba Bardhaman._2ND CALL. ORD/000161/2021-2022 4930/BWD 28/09/2021 45 KAJAL MUKHERJEE 5.84 5.94 101.71 0
4758 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Continuation work order for Engagement of Laboratory personnel (Chemist/Bacteriologist and Lab Assistant) in 1 No. Sub District Laboratory within Durgapur Sub Division under Burdwan Division, PHE Dte., Purba Bardhaman. [Period 01/01/2022 to 30/04/2022] Junior Engineer1, Durgapur Sub-Division, PHE Dte. ORD/000435/2021-2022 726/DSD 22/12/2021 121 CLIFFORD FACILITY SERVICES PVT.LTD. 1.13 0.26 23.01 0
4759 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Engagement of Laboratory personnel (Chemist/Bacteriologist and Lab Assistant)in 2 Sub District Laboratories within Burdwan Sub-Division under Burdwan Division, P.H.E. Dte., Purba Bardhaman for the period from 01-01-2022 to 30-06-2022¿.Gr.C. ORD/000413/2021-2022 1799/BSD 31/12/2021 181 CLIFFORD FACILITY SERVICES PVT.LTD. 3.14 2.09 66.56 0
4760 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Continuation work for 'Operation & Maintenance of 08 (Eight) Nos. Sub District Laboratories in different Blocks under Burdwan Division, PHE Dte. (Period from 01.03.2022 to 31.08.2022)' [GROUP : A] AE(HQs) J.E. 2 BURDWAN ORD/000541/2021-2022 111/AE/HQ 28/02/2022 184 COMPUTER MEDIA 3.01 2.83 94.02 0
4761 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Engagement of laboratory personnels i.e. Chemist (One Person), Bacteriologist (One Person), Laboratory Assistant (One Person) , Sampling Assistant (One Person) and Computer Operator/Data Entry Operator (One Person) for Burdwan District Laboratory under Burdwan Division P.H.E Dte. at PHE Complex, Nababhat, Purba Bardhaman For the period from 01.03.2022 to 31.08.2022.Gr.C. ORD/000646/2021-2022 360/BSD 28/02/2022 6 ALAKA GHOSH 4.69 4.69 100 0
4762 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Continuation work order for Annual Maintenance Contract (AMC) for software up-gradation and other software related issues in existing computers, refilling of cartridge of the printers, replacement of battery of UPS in District, Sub-District and NGO Laboratories under Burdwan Division, PHE Dte.[Period from 01/09/2021 to 31/08/2022] AE(HQs) J.E. 2 BURDWAN ORD/000686/2021-2022 1733/AE/HQ 27/08/2021 365 COMPUTER MEDIA 1.96 0.98 50 0
4763 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Engagement of resource person to operate AAS at District Laboratory under Burdwan Division, PHE. Dte. [Period from 16.11.2021 to 15.05.2022]_Gr-A ORD/000675/2021-2022 1903/AE/HQ 16/11/2021 181 ALAKA GHOSH 0.79 0.79 100 0
4764 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Continuation work order for engagement of laboratory personnel (Sampling Assistant) in 7 Nos. Sub-District Laboratories under Burdwan Division, PHE Dte. [Period from 01/01/2022 to 30/06/2022] AE(HQs) J.E. 2 BURDWAN ORD/000812/2021-2022 1961/AE/HQ 28/12/2021 182 COMPUTER MEDIA 4.69 4.69 100 0
4765 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Providing service by assigning resource person for a period of 03 Months supervision of process of preparation for NABL recognition for Chemical Testing of portable water of Sub-District Level water quality laboratory including supply, installation of a requisites for NABL recognition through NABL GLAP application for 11 mandatory parameters and training on procedures with documentation thereof for SANKARI Sub-District water Testing Laboratory under Burdwan Division, PHE Dte.[Gr.-A] AE(HQs) J.E. 2 BURDWAN ORD/000809/2021-2022 1724/AE/HQ 25/08/2021 15 NATURAL RESOURCES CONSORTIUM 4.83 4.83 100 0
4766 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Providing service by assigning resource person for a period of 03 Months supervision of process of preparation for NABL recognition for Chemical Testing of portable water of Sub-District Level water quality laboratory including supply, installation of a requisites for NABL recognition through NABL GLAP application for 11 mandatory parameters and training on procedures with documentation thereof for SHAKTIGARH Sub-District water Testing Laboratory under Burdwan Division, PHE Dte.[Gr.-B] AE(HQs) J.E. 2 BURDWAN ORD/000810/2021-2022 1723/AE/HQ 25/08/2021 15 NATURAL RESOURCES CONSORTIUM 4.83 4.83 100 0
4767 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Maintenance charges of Burdwan District Laboratory under Burdwan Division PHE Dte. [Period from 01/08/2021 to 31/07/2022] ORD/000840/2021-2022 983/BSD 29/07/2021 365 ALAKA GHOSH 0.97 0.77 79.38 0
4768 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Supply & delivery of Chemicals for Arsenic test through AAS at District Laboratories under Burdwan Division PHE Dte. AE(HQs) J.E. 2 BURDWAN ORD/000834/2021-2022 1578/AE/HQ 14/07/2021 7 BHARATI CHEMICAL & SCIENTIFIC WORKS 3.09 2.57 83.17 0
4769 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Providing service by assigning Resource person for a period of 3 months supervision of process of preparation for NABL recognition for Chemical Testing of potable water of Sub-District Level Water Quality Testing Laboratory including supply, installation of a requisites for NABL recognition through NABL GLAP application for 11 mandatory parameters and training on procedures with documentation thereof for ANUKHAL Sub-District Water Testing Laboratory under Burdwan Divn., PHE. Dte. [Group : D] AE(HQs) J.E. 2 BURDWAN ORD/000817/2021-2022 1726/AE/HQ 25/08/2021 90 LAXMI ENTERPRISE 4.83 4.83 100 0
4770 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Providing service by assigning Resource person for a period of 3 months supervision of process of preparation for NABL recognition for Chemical Testing of potable water of Sub-District Level Water Quality Testing Laboratory including supply, installation of a requisites for NABL recognition through NABL GLAP application for 11 mandatory parameters and training on procedures with documentation thereof for BANNABAGRAM Sub-District Water Testing Laboratory under Burdwan Divn., PHE. Dte. [Group : F] AE(HQs) J.E. 2 BURDWAN ORD/000818/2021-2022 1721/AE/HQ 25/08/2021 90 LAXMI ENTERPRISE 4.83 4.83 100 0
4771 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Salary of NGO Lab Personnel (Chemist/Bacteriologist and Lab Assistant) For the month of April May & June'2022 under Burdwan division, PHE Dte. VCH/000462/2022-2023 517/LAB/22-23 06/09/2022 0 DR CHATTERJEES VILLAGE WELFARE SOCIETY 0.99 0.00 0 0
4772 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Payment of NGO LAB Personnel (Chemist/Bacteriologist & Lab Assistant) for the month of August'22. VCH/000816/2022-2023 795/LAB/22-23 24/11/2022 0 SHASTRI SMRITI SANGHA 0.31 0.00 0 0
4773 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Salary of NGO Lab Personnel (Chemist/Bacteriologist and Lab Assistant) For the month of April May & June'2022 under Burdwan division, PHE Dte. VCH/000463/2022-2023 515/LAB/22-23 06/09/2022 0 AIKYATAN DEVELOPMENT SOCIETY 0.99 0.00 0 0
4774 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Salary of NGO Lab Personnel (Chemist/Bacteriologist and Lab Assistant) For the month of April May & June'2022 under Burdwan division, PHE Dte. VCH/000464/2022-2023 519/LAB/22-23 06/09/2022 0 SHASTRI SMRITI SANGHA 0.90 0.00 0 0
4775 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Salary bill of NGO Laboratory personnel (Chemist/Bacteriologist and Lab Assistant) under Burdwan Division, PHE Dte. for the month of July'2022. VCH/000512/2022-2023 719/LAB/22-23 28/10/2022 0 SIDHU KANU GRAM UNNAYAN SAMITI 0.33 0.00 0 0
4776 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Payment of NGO LAB Personnel (Chemist/Bacteriologist & Lab Assistant) for the month of August'22. VCH/000815/2022-2023 794/LAB/22-23 24/11/2022 0 DR CHATTERJEES VILLAGE WELFARE SOCIETY 0.33 0.00 0 0
4777 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Salary of NGO Lab Personnel (Chemist/Bacteriologist and Lab Assistant) For the month of April May & June'2022 under Burdwan division, PHE Dte. VCH/000465/2022-2023 518/LAB/22-23 06/09/2022 0 SIKSHA-NIKATAN 0.75 0.00 0 0
4778 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Salary bill of NGO Laboratory personnel (Chemist/Bacteriologist and Lab Assistant) under Burdwan Division, PHE Dte. for the month of July'2022. VCH/000510/2022-2023 716/LAB/22-23 28/10/2022 0 DR CHATTERJEES VILLAGE WELFARE SOCIETY 0.33 0.00 0 0
4779 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Salary bill of NGO Laboratory personnel (Chemist/Bacteriologist and Lab Assistant) under Burdwan Division, PHE Dte. for the month of July'2022. VCH/000511/2022-2023 717/LAB/22-23 28/10/2022 0 SHASTRI SMRITI SANGHA 0.31 0.00 0 0
4780 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Salary of Lab personnel (Chemist/Bacteriologist and Lab Assistant) of NGO managed laboratory for the month of September'2022. BILL/00009/2022-2023 810/LAB/22-23 29/11/2022 0 DR CHATTERJEES VILLAGE WELFARE SOCIETY 0.33 0.00 0 0
4781 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Salary of Lab personnel (Chemist/Bacteriologist and Lab Assistant) of NGO managed laboratory for the month of September'2022. BILL/00010/2022-2023 811/LAB/22-23 29/11/2022 0 SHASTRI SMRITI SANGHA 0.31 0.00 0 0
4782 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Salary of NGO Lab Personnel (Chemist/Bacteriologist and Lab Assistant) For the month of April May & June'2022 under Burdwan division, PHE Dte. VCH/000461/2022-2023 516/LAB/22-23 06/09/2022 0 SIDHU KANU GRAM UNNAYAN SAMITI 0.99 0.00 0 0
4783 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Salary bill of NGO Laboratory personnel (Chemist/Bacteriologist and Lab Assistant) under Burdwan Division, PHE Dte. for the month of July'2022. VCH/000513/2022-2023 718/LAB/22-23 28/10/2022 0 AIKYATAN DEVELOPMENT SOCIETY 0.33 0.00 0 0
4784 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Salary of Lab personnel (Chemist/Bacteriologist and Lab Assistant) of NGO managed laboratory for the month of September'2022. BILL/00011/2022-2023 809/LAB/22-23 29/11/2022 0 AIKYATAN DEVELOPMENT SOCIETY 0.33 0.00 0 0
4785 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Payment of NGO LAB Personnel (Chemist/Bacteriologist & Lab Assistant) for the month of August'22. VCH/000814/2022-2023 793/LAB/22-23 24/11/2022 0 AIKYATAN DEVELOPMENT SOCIETY 0.33 0.00 0 0
4786 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Engagement of laboratory personnel (Chemist / Bacteriologist and Lab Assistant) in Ganganandapur Sub District Laboratory within Kalna Sub-Division under Burdwan Division, P.H.E. Dte., Purba Bardhaman. [Period from 01.01.2022 to 30.06.2022] Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000587/2021-2022 1302/KSD 31/12/2021 180 CLIFFORD FACILITY SERVICES PVT.LTD. 1.57 0.00 0 0
4787 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Engagement of laboratory personnel (Chemist / Bacteriologist and Lab Assistant) in Anukhal Sub-District Laboratory within Kalna Sub-Division under Burdwan Division, P.H.E. Dte., Purba Bardhaman. [Period from 01.01.2022 to 30.06.2022]. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000586/2021-2022 1301/KSD 31/12/2021 180 CLIFFORD FACILITY SERVICES PVT.LTD. 1.57 0.00 0 0
4788 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Work Order for "Engagement of laboratory personnel (Chemist , Bacteriologist and Lab Assistant) in Parulia Sub District Water Testing Laboratory & Kamalnagar WTP laboratory within Kalna Sub-Division under Burdwan Division, P.H.E. Dte., Purba Bardhaman. [Period from 01.01.2023 to 31.01.2023]" Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000611/2022-2023 1145/KSD 30/12/2022 31 SURATH DEY 0.59 0.59 100 0
4789 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Work Order for "Engagement of laboratory personnel (Chemist , Bacteriologist and Lab Assistant) in Ganganandapur Sub-District Water Testing Laboratory within Kalna Sub-Division under Burdwan Division, P.H.E. Dte., Purba Bardhaman. [Period from 01.01.2023 to 31.01.2023]" Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000613/2022-2023 1149/KSD 30/12/2022 31 BUILD-TECH 0.37 0.37 100 0
4790 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Continuation work order for "Engagement of laboratory personnel (Chemist , Bacteriologist and Lab Assistant) in Parulia Sub District Water Testing Laboratory & Kamalnagar WTP laboratory within Kalna Sub-Division under Burdwan Division, P.H.E. Dte., Purba Bardhaman. [Period from 01.02.2023 to 28.02.2023]" Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000748/2022-2023 71/B/KSD 30/01/2023 28 SURATH DEY 0.59 0.59 100 0
4791 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Continuation work order for "Engagement of laboratory personnel (Chemist , Bacteriologist and Lab Assistant) in Ganganandapur Sub-District Water Testing Laboratory within Kalna Sub-Division under Burdwan Division, P.H.E. Dte., Purba Bardhaman. [Period from 01.02.2023 to 28.02.2023]" Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000747/2022-2023 71/A/KSD 30/01/2023 28 BUILD-TECH 0.37 0.37 100 0
4792 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Continuation Work Order for engagement of laboratory personnel i.e. AAS Operator (One Person) and Computer Operator/Data Entry Operator (One Person) for Burdwan District Laboratory under Burdwan Division P.H.E Dte. at PHE Complex, Nababhat, Purba Bardhaman, For the period from 01.03.2023 to 31.03.2023. ORD/000836/2022-2023 337/BSD 27/02/2023 31 ALAKA GHOSH 0.40 0.40 100 0
4793 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Continuation Work Order for engagement of laboratory personnel i.e. Chemist (One Person), Bacteriologist (One Person), Laboratory Assistant (One Person), Sampling Assistant (One Person) for Burdwan District Laboratory under Burdwan Division P.H.E Dte. at PHE Complex, Nababhat, Purba Bardhaman. For the period from 01.03.2023 to 31.03.2023. ORD/000837/2022-2023 336/BSD 27/02/2023 31 ALAKA GHOSH 0.84 0.84 100 0
4794 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Continuation Work Order for "Engagement of laboratory personnel (Chemist , Bacteriologist and Lab Assistant) in Ganganandapur Sub-District Water Testing Laboratory within Kalna Sub-Division under Burdwan Division, P.H.E. Dte., Purba Bardhaman. [Period from 01.04.2023 to 30.04.2023]" Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000822/2022-2023 292/KSD 31/03/2023 30 BUILD-TECH 0.37 0.37 100 0
4795 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Cotinuation work order for "Engagement of laboratory personnel (Chemist , Bacteriologist and Lab Assistant) in Anukhal Sub District Water Testing laboratory within Kalna Sub-Division under Burdwan Division, P.H.E. Dte., Purba Bardhaman. [Period from 01.03.2023 to 31.03.2023]" JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000783/2022-2023 165/KSD 27/02/2023 31 ALAKA GHOSH 0.37 0.37 100 0
4796 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Continuation work order for "Engagement of laboratory personnel (Chemist / Bacteriologist and Lab Assistant) in Manteswar Sub District Water Testing Laboratory within Kalna Sub-Division under Burdwan Division, P.H.E. Dte., Purba Bardhaman. [Period from 01.03.2023 to 31.03.2023]." JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000784/2022-2023 166/KSD 27/02/2023 31 ALAKA GHOSH 0.59 0.59 100 0
4797 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Continuation work order for "Engagement of laboratory personnel (Chemist , Bacteriologist and Lab Assistant) in Parulia Sub District Water Testing Laboratory & Kamalnagar WTP laboratory within Kalna Sub-Division under Burdwan Division, P.H.E. Dte., Purba Bardhaman. [Period from 01.03.2023 to 31.03.2023]" JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000786/2022-2023 168/KSD 27/02/2023 31 SURATH DEY 0.59 0.59 100 0
4798 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Engagement of Laboratory personnel (Chemist/Bacteriologist and Lab Assistant)in 2 Sub District Laboratories within Burdwan Sub-Division under Burdwan Division, P.H.E. Dte., Purba Bardhaman for the period from 01-05-2023 to 31-05-2023 ORD/000217/2023-2024 792/BSD 28/04/2023 31 CLIFFORD FACILITY SERVICES PVT.LTD. 0.52 0.00 0 0
4799 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Engagement of laboratory personnel i.e. Chemist (One Person), AAS Operator (One person) Bacteriologist (One Person), Laboratory Assistant (One Person), Sampling Assistant (One Person) and Computer Operator/Data Entry Operator (One Person) for Burdwan District Laboratory under Burdwan Division P.H.E Dte. at PHE Complex, Nababhat, Purba Bardhaman. [Period for 6 (Six) Months i.e. 01.06.2023 to 30.11.2023]. ORD/000156/2023-2024 2449/BWD 31/05/2023 183 ALAKA GHOSH 7.40 7.41 100.14 100
4800 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Arrangement of drinking water supply in BONNABAGRAM Water Testing Laboratory by sinking of 75 Mtr. Deep 40 x 100 mm. dia., with PVC pipe, DWP Tube wells in the district of Purba Bardhaman under Burdwan Division, PHE. Dte. AE(HQs) J.E. 2 BURDWAN ORD/000361/2023-2024 357/AE/HQ 18/07/2023 30 UDYOG CONSTRUCTION 0.96 0.00 0 0
4801 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Engagement of laboratory personnel (Chemist / Bacteriologist and Lab Assistant) in Parulia Sub District Laboratory & Kamalnagar WTP laboratory within Kalna Sub-Division under Burdwan Division, P.H.E. Dte., Purba Bardhaman. [Period from 01.07.2021 to 30.06.2022 (Sl No-1) Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000109/2021-2022 564/KSD 30/06/2021 365 CLIFFORD FACILITY SERVICES PVT.LTD. 4.93 1.64 33.27 0
4802 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Continuation work order for Engagement of resource person to operate AAS at District Laboratory under Burdwan Division, PHE. Dte. [Period from 16.05.2022 to 31.08.2022] [Gr. A] AE(HQs) J.E. 2 BURDWAN ORD/000064/2022-2023 276/AE/HQ 10/05/2022 108 ALAKA GHOSH 0.46 0.46 100 0
4803 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Supply of different laboratory equipment's at UPVC pipe Testing laboratory at Nababhat PHE Complex for monitoring and control over the quality of concrete of different water supply scheme under Burdwan Division, PHE Dte._2nd Call Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer2, Durgapur Sub-Division, PHE Dte. ORD/000024/2022-2023 195/DSD 04/04/2022 7 MAUVE ENGINEERING AND SERVICES PVT LTD 2.74 2.74 100 0
4804 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Continuation work for Engagement of laboratory personnel (Contractual) for smooth running of the uPVC pipe testing laboratory at Nababhat under Burdwan Division, PHE. Dte. [Period from 15.04.2022 to 14.09.2022]_Gr-A AE(HQs) J.E. 2 BURDWAN ORD/000651/2021-2022 132/AE/HQ 10/03/2022 6 M/S ASHA CONSTRUCTION 2.99 2.99 100 0
4805 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Continuation work order for engagement of laboratory personnel (Chemist/Bacteriologist and Lab Assistant) in Ganganandapur Sub-District Laboratory within Kalna Sub-Division under Burdwan Division, PHE Dte.[Period from 01/01/2022 to 30/06/2022] Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000685/2021-2022 1302/KSD 31/12/2021 181 CLIFFORD FACILITY SERVICES PVT.LTD. 1.57 1.05 66.88 0
4806 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Continuation work order for engagement of laboratory personnel (Chemist/Bacteriologist and Lab Assistant) in Anukhal Sub-District Laboratory within Kalna Sub-Division under Burdwan Division, PHE Dte.[Period from 01/01/2022 to 30/06/2022] Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000687/2021-2022 1301/KSD 31/12/2021 181 CLIFFORD FACILITY SERVICES PVT.LTD. 1.57 1.05 66.88 0
4807 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Continuation work order for engagement of laboratory personnel (Chemist/Bacteriologist and Lab Assistant) in 02 Nos. Sub-District laboratories within Head Quarters under Burdwan Division, PHE Dte. [Period from 01/01/2022 to 30/06/2022] AE(HQs) J.E. 2 BURDWAN ORD/000802/2021-2022 1962/AE/HQ 28/12/2021 182 COMPUTER MEDIA 3.14 3.14 100 0
4808 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Engagement of laboratory personnel (Sampling Assistant) in 7 Nos. Sub District Laboratories under Burdwan Division, P.H.E. Dte. [Period from 01.08.2022 to 31.12.2022] GROUP : B AE(HQs) J.E. 2 BURDWAN ORD/000328/2022-2023 418/AE/HQ 29/07/2022 153 COMPUTER MEDIA 3.92 3.92 100 0
4809 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Continuation work for Engagement of resource person to operate AAS at District Laboratory under Burdwan Division, PHE. Dte. [Period from 01.09.2022 to 30.09.2022] [Gr. A] AE(HQs) J.E. 2 BURDWAN ORD/000427/2022-2023 457/AE/HQ 31/08/2022 30 ALAKA GHOSH 0.13 0.13 100 0
4810 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Providing service by assigning resource person for a period of 03 Months supervision of process of preparation for NABL recognition for Chemical Testing of portable water of Sub-District Level water quality laboratory including supply, installation of a requisites for NABL recognition through NABL GLAP application for 11 mandatory parameters and training on procedures with documentation thereof for SATGACHIA Sub-District water Testing Laboratory under Burdwan Division, PHE Dte.[Gr.-C] AE(HQs) J.E. 2 BURDWAN ORD/000780/2021-2022 1725/AE/HQ 25/08/2021 15 NATURAL RESOURCES CONSORTIUM 4.83 4.83 100 0
4811 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Engagement of Laboratory personnel (Chemist/Bacteriologist and Lab Assistant) in 2 Sub District Laboratories within Burdwan Sub-Division under Burdwan Division, P.H.E. Dte., Purba Bardhaman for the period from 01-07-2022 to 31-12-2022. Sl.No.69. ORD/000424/2022-2023 1129/BSD 30/06/2022 184 CLIFFORD FACILITY SERVICES PVT.LTD. 3.33 3.33 100 0
4812 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Continuation Work Order for "Engagement of laboratory personnel (Chemist / Bacteriologist and Lab Assistant) in Ganganandapur Sub District Laboratory within Kalna Sub-Division under Burdwan Division, P.H.E. Dte., Purba Bardhaman. [Period from 01.07.2022 to 30.09.2022]". Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000213/2022-2023 581/KSD 30/06/2022 92 CLIFFORD FACILITY SERVICES PVT.LTD. 0.78 0.78 100 0
4813 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Continuation work order for "Engagement of laboratory personnel (Chemist / Bacteriologist and Lab Assistant) in Anukhal Sub-District Laboratory within Kalna Sub-Division under Burdwan Division, P.H.E. Dte., Purba Bardhaman. [Period from 01.07.2022 to 30.09.2022]" Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000214/2022-2023 582/KSD 30/06/2022 92 CLIFFORD FACILITY SERVICES PVT.LTD. 0.78 0.78 100 0
4814 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Continuation Work Order for "Engagement of laboratory personnel (Chemist / Bacteriologist and Lab Assistant) in Parulia Sub District Laboratory & Kamalnagar WTP laboratory within Kalna Sub-Division under Burdwan Division, P.H.E. Dte., Purba Bardhaman. [Period from 01.07.2022 to 30.09.2022]" Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000215/2022-2023 583/KSD 30/06/2022 92 CLIFFORD FACILITY SERVICES PVT.LTD. 1.23 1.23 100 0
4815 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Continuation work for 'Operation & Maintenance of 08 (Eight) Nos. Sub District Laboratories in different Blocks under Burdwan Division, PHE Dte. (Period from 01.09.2022 to 31.12.2022)' [GROUP : A] AE(HQs) J.E. 2 BURDWAN ORD/000465/2022-2023 459/AE/HQ 31/08/2022 122 COMPUTER MEDIA 1.99 1.81 90.95 100
4816 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Continuation work order for Annual Maintenance Contract (AMC) for software upgradation and other software related issues in existing computers, refilling of Cartridge of the printers, replacement of battery of UPS in District, Sub-Dist. and NGO Laboratories under Burdwan Division, P.H.E. Dte. [Period from 01.09.2022 to 31.12.2022] [Group : A] AE(HQs) J.E. 2 BURDWAN ORD/000466/2022-2023 458/AE/HQ 31/08/2022 122 COMPUTER MEDIA 0.65 0.65 100 100
4817 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Engagement of laboratory personnel (Chemist / Bacteriologist and Lab Assistant) in 1 (One) Sub District Laboratoriy within Headquaters under Burdwan Division, P.H.E. Dte., Purba Bardhaman. [Period from 01.07.2022 to 31.07.2022] [GROUP : A] AE(HQs) J.E. 2 BURDWAN ORD/000304/2022-2023 362/AE/HQ 30/06/2022 31 COMPUTER MEDIA 0.26 0.26 100 0
4818 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Supply & Delivery of Chemicals, reagents and consumables for 14(Fourteen) laboratories under Burdwan Division, P.H.E. Dte. ORD/000303/2022-2023 3598/BWD 18/08/2022 20 M/S LAXMI ENTERPRISE 26.61 26.61 100 0
4819 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Work order for "Engagement of laboratory personnel (Chemist / Bacteriologist and Lab Assistant) in Anukhal Sub-District Laboratory within Kalna Sub-Division under Burdwan Division, P.H.E. Dte., Purba Bardhaman. [Period from 01.10.2022 to 31.12.2022] " Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000556/2022-2023 941/KSD 29/09/2022 92 CLIFFORD FACILITY SERVICES PVT.LTD. 0.78 0.78 100 100
4820 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP work order for "Engagement of laboratory personnel (Chemist / Bacteriologist and Lab Assistant) in Ganganandapur Sub District Laboratory within Kalna Sub-Division under Burdwan Division, P.H.E. Dte., Purba Bardhaman. [Period from 01.10.2022 to 31.12.2022]" Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000558/2022-2023 941/B/KSD 29/09/2022 92 CLIFFORD FACILITY SERVICES PVT.LTD. 0.78 0.78 100 100
4821 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Work Order for Engagement of laboratory personnel (Chemist / Bacteriologist and Lab Assistant) in Parulia Sub District Laboratory & Kamalnagar WTP laboratory within Kalna Sub-Division under Burdwan Division, P.H.E. Dte., Purba Bardhaman. [Period from 01.10.2022 to 31.12.2022] Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000559/2022-2023 941/C/KSD 29/09/2022 92 CLIFFORD FACILITY SERVICES PVT.LTD. 1.23 1.23 100 100
4822 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Engagement of resource person to operate AAS at District Laboratory under Burdwan Division, PHE. Dte. [Period from 01.10.2022 to 31.12.2022] AE(HQs) J.E. 2 BURDWAN ORD/000522/2022-2023 520/AE/HQ 29/09/2022 91 ALAKA GHOSH 0.50 0.50 100 0
4823 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Work Order for "Engagement of laboratory personnel (Chemist , Bacteriologist and Lab Assistant) in Anukhal Sub District Water Testing laboratory within Kalna Sub-Division under Burdwan Division, P.H.E. Dte., Purba Bardhaman. [Period from 01.01.2023 to 31.01.2023]" Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000612/2022-2023 1148/KSD 30/12/2022 31 ALAKA GHOSH 0.37 0.37 100 0
4824 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Payment of festival bonus for the accounting year 2021-22 to laboratory personnel of District and Sub-District laboratory under Burdwan Division, PHE Dte. AE(HQs) J.E. 2 BURDWAN ORD/000615/2022-2023 511/AE/HQ 26/09/2022 7 M/S S. CHOUDHURY 0.83 0.00 0 100
4825 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Engagement of Laboratory personnel (Chemist/Bacteriologist, Lab Assistant & Sampling Assistant) in Satgachia Sub District Laboratory within Headquarters under Burdwan Division, PHE Dte., Purba Bardhaman. [Period 01/01/2023 to 31/01/2023] AE(HQs) J.E. 2 BURDWAN ORD/000616/2022-2023 661/AE/HQ 30/12/2022 31 COMPUTER MEDIA 0.51 0.51 100 100
4826 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Engagement of Laboratory personnel (Chemist/Bacteriologist & Lab Assistant) in Barshul Sub District Laboratory within Headquarters under Burdwan Division, PHE Dte., Purba Bardhaman. [Period 01/01/2023 to 31/01/2023] AE(HQs) J.E. 2 BURDWAN ORD/000618/2022-2023 663/AE/HQ 30/12/2022 31 COMPUTER MEDIA 0.58 0.58 100 100
4827 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Continuation Work Order for Engagement of Laboratory Personnel i.e. Chemist (One Person), Bacteriologist (One Person), Laboratory Assistant(One Person), Sampling Assistant (One Person) and Computer Operator/Data Entry Operator (One Person) for Burdwan District Laboratory under Burdwan Division, PHE Dte at PHE Complex, Nababhat, Burdwan. For the period from 01.09.2022 to 31.12.2022¿. ORD/000557/2022-2023 1489/BSD 26/08/2022 122 ALAKA GHOSH 3.14 3.14 100 0
4828 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Work Order for "Engagement of laboratory personnel (Chemist / Bacteriologist and Lab Assistant) in Manteswar Sub District Water Testing Laboratory within Kalna Sub-Division under Burdwan Division, P.H.E. Dte., Purba Bardhaman. [Period from 01.01.2023 to 31.01.2023]." Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000609/2022-2023 1115/KSD 23/12/2022 31 ALAKA GHOSH 0.59 0.59 100 0
4829 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Maintenance charges of Burdwan District Laboratory under Burdwan Division,PHE Dte (Period from 01.08.2022 to 31.12.2022). Gr.A. ORD/000505/2022-2023 1328/BSD 28/07/2022 153 ALAKA GHOSH 0.37 0.35 94.59 0
4830 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Work Order for "Engagement of laboratory personnel (Chemist / Bacteriologist and Lab Assistant) in Manteswar Sub District Water Testing Laboratory within Kalna Sub-Division under Burdwan Division, P.H.E. Dte., Purba Bardhaman. [Period from 01.10.2022 to 31.10.2022]." Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000606/2022-2023 937/KSD 29/09/2022 31 ALAKA GHOSH 0.43 0.43 100 0
4831 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Work Order for "Engagement of laboratory personnel (Chemist / Bacteriologist and Lab Assistant) in Manteswar Sub District Water Testing Laboratory within Kalna Sub-Division under Burdwan Division, P.H.E. Dte., Purba Bardhaman. [Period from 01.09.2022 to 30.09.2022]." Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000586/2022-2023 711/KSD 23/08/2022 30 ALAKA GHOSH 0.43 0.43 100 0
4832 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Construction of concrete road & providing plinth protection due to soil erosion including wiring work at SANKARI Sub District Laboratory under Burdwan Division, PHE. Dte. AE(HQs) J.E. 2 BURDWAN ORD/000623/2022-2023 521/AE/HQ 29/09/2022 30 KAJAL MUKHERJEE 0.72 0.71 98.61 0
4833 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Work Order for "Engagement of laboratory personnel (Chemist / Bacteriologist and Lab Assistant) in Manteswar Sub District Water Testing Laboratory within Kalna Sub-Division under Burdwan Division, P.H.E. Dte., Purba Bardhaman. [Period from 01.08.2022 to 31.08.2022]". Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000585/2022-2023 607/KSD 25/07/2022 31 ALAKA GHOSH 0.43 0.43 100 0
4834 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Work Order for "Engagement of laboratory personnel (Chemist / Bacteriologist and Lab Assistant) in Manteswar Sub District Water Testing Laboratory within Kalna Sub-Division under Burdwan Division, P.H.E. Dte., Purba Bardhaman. [Period from 01.11.2022 to 31.12.2022]." Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000608/2022-2023 969/KSD 20/10/2022 61 ALAKA GHOSH 0.87 0.87 100 0
4835 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Engagement of laboratory personnel i.e. Chemist (One Person), Bacteriologist (One Person), Laboratory Assistant (One Person), Sampling Assistant (One Person) for Burdwan District Laboratory under Burdwan Division P.H.E Dte. at PHE Complex, Nababhat, Purba Bardhaman. For the period from 01.01.2023 to 31.01.2023. ORD/000642/2022-2023 2328/BSD 30/12/2022 31 ALAKA GHOSH 0.84 0.84 100 0
4836 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Engagement of laboratory personnel i.e. AAS Operator (One Person) and Computer Operator/Data Entry Operator (One Person) for Burdwan District Laboratory under Burdwan Division P.H.E Dte. at PHE Complex, Nababhat, Purba Bardhaman, For the period from 01.01.2023 to 31.01.2023. ORD/000643/2022-2023 2329/BSD 30/12/2022 31 ALAKA GHOSH 0.40 0.40 100 0
4837 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Providing acrylic distemper including electrical wiring work and fitting of wash basin for modification of old building of Bursul Godown area to set up Sikhaniketan Sub-Dist. Laboratory under Burdwan Division, PHE. Dte. AE(HQs) J.E. 2 BURDWAN ORD/000631/2022-2023 598/AE/HQ 07/12/2022 15 ANWESHA CONSTRUCTION 0.40 0.40 100 0
4838 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Proposed renovation extension and modification (Civil Structure Part) of Old Building of Borsul Godown area to set up Barshul Sub District Laboratory under Burdwan Division, PHE. Dte. AE(HQs) J.E. 2 BURDWAN ORD/000624/2022-2023 522/AE/HQ 29/09/2022 30 ANWESHA CONSTRUCTION 0.89 0.83 93.26 0
4839 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Supplying, delivery and installation of metal vinyle ACP board (4' x 3') for various water testing laboratories under Burdwan Division PHE Dte. AE(HQs) J.E. 2 BURDWAN ORD/000705/2022-2023 115/AE/HQ 22/02/2023 15 ISHAN CONSTRUCTION 0.84 0.84 100 0
4840 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Continuation work order for "Engagement of laboratory personnel (Chemist / Bacteriologist and Lab Assistant) in Manteswar Sub District Water Testing Laboratory within Kalna Sub-Division under Burdwan Division, P.H.E. Dte., Purba Bardhaman. [Period from 01.02.2023 to 28.02.2023]." Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000745/2022-2023 70/A/KSD 30/01/2023 28 ALAKA GHOSH 0.59 0.59 100 0
4841 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Continuation work order for "Engagement of laboratory personnel (Chemist , Bacteriologist and Lab Assistant) in Anukhal Sub District Water Testing laboratory within Kalna Sub-Division under Burdwan Division, P.H.E. Dte., Purba Bardhaman. [Period from 01.02.2023 to 28.02.2023]" Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000746/2022-2023 70/B/KSD 30/01/2023 28 ALAKA GHOSH 0.37 0.37 100 0
4842 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Continuation work order for engagement of laboratory personnel (Chemist/Bacteriologist and Lab Assistant) in 2 Nos. Sub-Dist Laboratories within Head Quarters under Burdwan Division, PHE Dte. [Period from 01/07/2022 to 31/07/2022] AE(HQs) J.E. 2 BURDWAN ORD/000738/2022-2023 358/AE/HQ 28/06/2022 30 COMPUTER MEDIA 0.52 0.52 100 0
4843 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Continuation work order for engagement of laboratory personnel (Sampling Assistant) in 7 Nos. Sub-Dist Laboratories within Head Quarters under Burdwan Division, PHE Dte. [Period from 01/07/2022 to 31/07/2022] AE(HQs) J.E. 2 BURDWAN ORD/000739/2022-2023 357/AE/HQ 28/06/2022 30 COMPUTER MEDIA 0.78 0.78 100 0
4844 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Continuation work order for "Engagement of laboratory personnel (Chemist , Bacteriologist and Lab Assistant) in Parulia Sub District Water Testing Laboratory & Kamalnagar WTP laboratory within Kalna Sub-Division under Burdwan Division, P.H.E. Dte., Purba Bardhaman. [Period from 01.04.2023 to 30.04.2023]" Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000823/2022-2023 293/KSD 31/03/2023 30 SURATH DEY 0.59 0.59 100 100
4845 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Continuation Work Order for engagement of laboratory personnel i.e. Chemist (One Person), Bacteriologist (One Person), Laboratory Assistant (One Person) , Sampling Assistant (One Person) for Burdwan District Laboratory under Burdwan Division P.H.E Dte. at PHE Complex, Nababhat, Purba Bardhaman. For the period from 01.02.2023 to 28.02.2023. ORD/000781/2022-2023 121/BSD 01/02/2023 28 ALAKA GHOSH 0.84 0.84 100 0
4846 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Continuation Work order "Engagement of laboratory personnel (Chemist , Bacteriologist and Lab Assistant) in Ganganandapur Sub-District Water Testing Laboratory within Kalna Sub-Division under Burdwan Division, P.H.E. Dte., Purba Bardhaman. [Period from 01.03.2023 to 31.03.2023]" JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000785/2022-2023 167/KSD 27/02/2023 31 BUILD-TECH 0.37 0.37 100 100
4847 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Continuation work order for "Engagement of laboratory personnel (Chemist , Bacteriologist and Lab Assistant) in Anukhal Sub District Water Testing laboratory within Kalna Sub-Division under Burdwan Division, P.H.E. Dte., Purba Bardhaman. [Period from 01.04.2023 to 30.04.2023]" Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000820/2022-2023 290/KSD 31/03/2023 30 ALAKA GHOSH 0.37 0.37 100 100
4848 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Continuation work Order for "Engagement of laboratory personnel (Chemist / Bacteriologist and Lab Assistant) in Manteswar Sub District Water Testing Laboratory within Kalna Sub-Division under Burdwan Division, P.H.E. Dte., Purba Bardhaman. [Period from 01.04.2023 to 30.04.2023]." Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000821/2022-2023 291/KSD 31/03/2023 30 ALAKA GHOSH 0.59 0.59 100 100
4849 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Continuation Work Order for ¿engagement of laboratory personnels i.e. AAS Operator (One Person) and Computer Operator/Data Entry Operator (One Person) for Burdwan District Laboratory under Burdwan Division P.H.E Dte. at PHE Complex, Nababhat, Purba Bardhaman, For the period from 01.02.2023 to 28.02.2023. ORD/000782/2022-2023 122/BSD 01/02/2023 28 ALAKA GHOSH 0.40 0.40 100 0
4850 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Engagement of Laboratory personnel (Sampling Assistant) in 5 Nos. Sub District Laboratories within Burdwan Division, PHE Dte., Purba Bardhaman. [Period from 01.01.2023 to 31.01.2023] AE(HQs) J.E. 2 BURDWAN ORD/000873/2022-2023 666/AE/HQ 30/12/2022 31 COMPUTER MEDIA 0.74 0.74 100 100
4851 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Continuation work order for Engagement of Laboratory personnel (Chemist/ Bacteriologist & Lab Assistant) in Barshul Sub District Laboratory within Headquarters under Burdwan Division, PHE Dte., Purba Bardhaman. [Period 01/02/2023 to 28/02/2023] AE(HQs) J.E. 2 BURDWAN ORD/000907/2022-2023 89-A/AE/HQ 31/01/2023 28 COMPUTER MEDIA 0.58 0.58 100 100
4852 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Continuation Work Order for Engagement of laboratory personnel i.e. Chemist (One Person), Bacteriologist (One Person), Laboratory Assistant (One Person) , Sampling Assistant (One Person) for Burdwan District Laboratory under Burdwan Division P.H.E Dte. at PHE Complex, Nababhat, Purba Bardhaman. For the period from 01.04.2023 to 30.04.2023. ORD/000883/2022-2023 599/BSD 30/03/2023 30 ALAKA GHOSH 0.84 0.84 100 100
4853 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Continuation Work Order for Engagement of laboratory personnel i.e. AAS Operator (One Person) and Computer Operator/Data Entry Operator (One Person) for Burdwan District Laboratory under Burdwan Division P.H.E Dte. at PHE Complex, Nababhat, Purba Bardhaman, For the period from 01.04.2023 to 30.04.2023. ORD/000884/2022-2023 600/BSD 30/03/2023 30 ALAKA GHOSH 0.40 0.40 100 100
4854 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Laboratory maintenance in 7 Nos. Sub District Laboratories under Burdwan Division, PHE Dte., Purba Bardhaman. [Period from 01.03.2023 to 30.04.2023] AE(HQs) J.E. 2 BURDWAN ORD/000899/2022-2023 122/AE/HQ 27/02/2023 59 COMPUTER MEDIA 0.85 0.82 96.47 100
4855 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Continuation work order for "Engagement of laboratory personnel (Chemist , Bacteriologist and Lab Assistant) in Ganganandapur Sub-District Water Testing Laboratory within Kalna Sub-Division under Burdwan Division, P.H.E. Dte., Purba Bardhaman. [Period from 01.05.2023 to 31.05.2023]". JUNIOR ENGINEER R.W.S. BURDWAN SUB-DIVISION PHE DTE ORD/000189/2023-2024 373/KSD 25/04/2023 31 BUILD-TECH 0.37 0.37 100 100
4856 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Engagement of Laboratory personnel (Chemist/Bacteriologist, Lab Assistant & Sampling Assistant) in Shaktigarh Sub District Laboratory within Headquarters under Burdwan Division, PHE Dte., Purba Bardhaman. [Period 01/02/2023 to 28/02/2023] AE(HQs) J.E. 2 BURDWAN ORD/000896/2022-2023 89/AE/HQ 31/01/2023 28 COMPUTER MEDIA 0.51 0.51 100 100
4857 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Continuation work order for "Engagement of laboratory personnel (Chemist , Bacteriologist and Lab Assistant) in Anukhal Sub District Water Testing laboratory within Kalna Sub-Division under Burdwan Division, P.H.E. Dte., Purba Bardhaman. [Period from 01.05.2023 to 31.05.2023]" JUNIOR ENGINEER R.W.S. BURDWAN SUB-DIVISION PHE DTE ORD/000186/2023-2024 371/KSD 25/04/2023 31 ALAKA GHOSH 0.37 0.37 100 100
4858 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Continuation work order for engagement of laboratory personnels i.e. Chemist (One Person), Bacteriologist (One Person), Laboratory Assistant (One Person), Sampling Assistant (One Person) for Burdwan District Laboratory under Burdwan Division P.H.E Dte. at PHE Complex, Nababhat, Purba Bardhaman. For the period from 01.05.2023 to 31.05.2023. ORD/000165/2023-2024 777/BSD 27/04/2023 31 ALAKA GHOSH 0.84 0.84 100 100
4859 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Continuation work order for engagement of laboratory personnel i.e. AAS Operator (One Person) and Computer Operator/Data Entry Operator (One Person) for Burdwan District Laboratory under Burdwan Division P.H.E Dte. at PHE Complex, Nababhat, Purba Bardhaman, For the period from 01.05.2023 to 31.05.2023. ORD/000166/2023-2024 778/BSD 27/04/2023 31 ALAKA GHOSH 0.40 0.40 100 100
4860 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Continuation work for Engagement of Laboratory personnel (Sampling Assistant) in 5 Nos. Sub District Laboratories within Burdwan Division, PHE Dte., Purba Bardhaman. [Period from 01.03.2023 to 31.03.2023] AE(HQs) J.E. 2 BURDWAN ORD/000905/2022-2023 121/AE/HQ 27/02/2023 31 COMPUTER MEDIA 0.74 0.74 100 100
4861 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Supply & Delivery of Chemicals, reagents and consumables for 14(Fourteen) laboratories under Burdwan Division, P.H.E. Dte. ORD/000087/2023-2024 2153/BWD 10/05/2023 20 BHARATI CHEMICAL & SCIENTIFIC WORKS 30.43 30.43 100 100
4862 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Continuation work order for Engagement of Laboratory personnel (Chemist/ Bacteriologist & Lab Assistant) in Barshul Sub District Laboratory within Headquarters under Burdwan Division, PHE Dte., Purba Bardhaman. [Period 01/05/2023 to 31/05/2023] AE(HQs) J.E. 2 BURDWAN ORD/000168/2023-2024 274-A/AE/HQ 27/04/2023 31 COMPUTER MEDIA 0.58 0.58 100 100
4863 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Continuation work order for Engagement of laboratory personnel (Chemist / Bacteriologist and Lab Assistant) in Manteswar Sub District Water Testing Laboratory within Kalna Sub-Division under Burdwan Division, P.H.E. Dte., Purba Bardhaman. [Period from 01.05.2023 to 31.05.2023]. JUNIOR ENGINEER R.W.S. BURDWAN SUB-DIVISION PHE DTE ORD/000187/2023-2024 372/KSD 25/04/2023 31 ALAKA GHOSH 0.59 0.59 100 100
4864 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Continuation Work Order for Engagement of Laboratory personnel (Chemist/ Bacteriologist, Lab Assistant & Sampling Assistant) in Satgachia Sub District Laboratory within Headquarters under Burdwan Division, PHE Dte., Purba Bardhaman. [Period 01/03/2023 to 31/03/2023] AE(HQs) J.E. 2 BURDWAN ORD/000912/2022-2023 120/AE/HQ 27/02/2023 31 COMPUTER MEDIA 0.51 0.51 100 100
4865 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Continuation Work Order for Engagement of Laboratory personnel (Chemist/ Bacteriologist, Lab Assistant & Sampling Assistant) in Satgachia Sub District Laboratory within Headquarters under Burdwan Division, PHE Dte., Purba Bardhaman. [Period 01/04/2023 to 30/04/2023] AE(HQs) J.E. 2 BURDWAN ORD/000913/2022-2023 206/AE/HQ 31/03/2023 30 COMPUTER MEDIA 0.51 0.51 100 100
4866 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Continuation Work Order for Engagement of Laboratory personnel (Chemist/ Bacteriologist, Lab Assistant & Sampling Assistant) in Satgachia Sub District Laboratory within Headquarters under Burdwan Division, PHE Dte., Purba Bardhaman. [Period 01/05/2023 to 31/05/2023] AE(HQs) J.E. 2 BURDWAN ORD/000170/2023-2024 273/AE/HQ 27/04/2023 31 COMPUTER MEDIA 0.51 0.51 100 100
4867 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Continuation work for Engagement of Laboratory personnel (Sampling Assistant) in 5 Nos. Sub District Laboratories within Burdwan Division, PHE Dte., Purba Bardhaman. [Period from 01.02.2023 to 28.02.2023] AE(HQs) J.E. 2 BURDWAN ORD/000904/2022-2023 87/AE/HQ 31/01/2023 28 COMPUTER MEDIA 0.74 0.74 100 100
4868 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Continuation work order for Engagement of Laboratory personnel (Chemist/ Bacteriologist & Lab Assistant) in Barshul Sub District Laboratory within Headquarters under Burdwan Division, PHE Dte., Purba Bardhaman. [Period 01/04/2023 to 30/04/2023] AE(HQs) J.E. 2 BURDWAN ORD/000909/2022-2023 207/AE/HQ 31/03/2023 30 COMPUTER MEDIA 0.58 0.58 100 100
4869 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Continuation Work Order for Engagement of Laboratory personnel (Chemist/ Bacteriologist, Lab Assistant & Sampling Assistant) in Satgachia Sub District Laboratory within Headquarters under Burdwan Division, PHE Dte., Purba Bardhaman. [Period 01/02/2023 to 28/02/2023] AE(HQs) J.E. 2 BURDWAN ORD/000911/2022-2023 88/AE/HQ 31/01/2023 28 COMPUTER MEDIA 0.51 0.51 100 100
4870 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Engagement of Laboratory personnel (Chemist/Bacteriologist, Lab Assistant & Sampling Assistant) in Shaktigarh Sub District Laboratory within Headquarters under Burdwan Division, PHE Dte., Purba Bardhaman. [Period 01/03/2023 to 31/03/2023] AE(HQs) J.E. 2 BURDWAN ORD/000897/2022-2023 119/AE/HQ 27/02/2023 31 COMPUTER MEDIA 0.51 0.51 100 100
4871 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Continuation work order for Engagement of Laboratory personnel (Chemist/ Bacteriologist & Lab Assistant) in Barshul Sub District Laboratory within Headquarters under Burdwan Division, PHE Dte., Purba Bardhaman. [Period 01/03/2023 to 31/03/2023] AE(HQs) J.E. 2 BURDWAN ORD/000908/2022-2023 118/AE/HQ 27/02/2023 31 COMPUTER MEDIA 0.58 0.58 100 100
4872 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Renovation of District Laboratory with meeting hall at Nababhat P.H.E Complex within RWS Sub-Division under Burdwan Division, PHE Dte. ORD/000139/2023-2024 788/BSD 28/04/2023 30 GHOSH ENTERPRISE 0.94 0.94 100 100
4873 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Procurement of consumables for OMAS for different Sub District Laboratories under Burdwan Division PHE Dte. [GROUP : A] AE(HQs) J.E. 2 BURDWAN ORD/000332/2022-2023 450/AE/HQ 25/08/2022 7 SUNANDA ENVIROMENTAL INTERNATIONAL PVT LTD. 4.97 4.97 100 0
4874 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Engagement of Laboratory personnel (Chemist/Bacteriologist and Lab Assistant) in 3 Nos. Sub District Laboratories within Headquarters under Burdwan Division, PHE Dte., Purba Bardhaman. [Period 01/08/2022 to 31/12/2022] GROUP : A AE(HQs) J.E. 2 BURDWAN ORD/000327/2022-2023 417/AE/HQ 29/07/2022 153 COMPUTER MEDIA 4.66 4.66 100 0
4875 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Engagement of Laboratory personnel (Chemist/Bacteriologist, Lab Assistant & Sampling Assistant) in Shaktigarh Sub District Laboratory within Headquarters under Burdwan Division, PHE Dte., Purba Bardhaman. [Period 01/01/2023 to 31/01/2023] AE(HQs) J.E. 2 BURDWAN ORD/000617/2022-2023 662/AE/HQ 30/12/2022 31 COMPUTER MEDIA 0.51 0.51 100 100
4876 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Salary of Lab personnel (Chemist/Bacteriologist and Lab Assistant) of NGO managed laboratory for the month of November'2022. BILL/00203/2022-2023 1064/JJM 13/02/2023 0 DR CHATTERJEES VILLAGE WELFARE SOCIETY 0.33 0.00 0 0
4877 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Salary of Lab personnel of NGO managed laboratory under Burdwan Division, PHE Dte. for the month of December'2022. BILL/00353/2022-2023 1156/JJM 09/03/2023 0 DR CHATTERJEES VILLAGE WELFARE SOCIETY 0.33 0.00 0 0
4878 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Salary of NGO Lab Personnel for the month of June & July'23. BILL/00391/2023-2024 550/JJM 21/08/2023 0 DR CHATTERJEES VILLAGE WELFARE SOCIETY 0.90 0.00 0 0
4879 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Salary of Lab personnel of NGO managed laboratory for the month of September'23 and festival bonus. BILL/00870/2023-2024 879/JJM 10/11/2023 0 DR CHATTERJEES VILLAGE WELFARE SOCIETY 0.61 0.00 0 0
4880 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Festival Bonus F.Y.-2021-2022 BILL/00206/2022-2023 1067/JJM 15/02/2023 0 DR CHATTERJEES VILLAGE WELFARE SOCIETY 0.14 0.00 0 0
4881 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Salary of Lab personnel of NGO managed laboratory under Burdwan Division, PHE Dte. for the month of January'23. BILL/00356/2022-2023 1159/JJM 09/03/2023 0 DR CHATTERJEES VILLAGE WELFARE SOCIETY 0.45 0.00 0 0
4882 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Salary of NGO Lab Personnel for the month of June & July'23. BILL/00392/2023-2024 551/JJM 21/08/2023 0 AIKYATAN DEVELOPMENT SOCIETY 0.90 0.00 0 0
4883 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Salary of NGO Lab Personnel for the month of June & July'23. BILL/00393/2023-2024 552/JJM 21/08/2023 0 SHASTRI SMRITI SANGHA 0.90 0.00 0 0
4884 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Salary bill of NGO for the month of October & November 2023. BILL/01072/2023-2024 1067/JJM 13/12/2023 0 SHASTRI SMRITI SANGHA 0.90 0.00 0 0
4885 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Salary of Lab personnel of NGO managed laboratory under Burdwan Division, PHE Dte. for the month of December'22. BILL/00355/2022-2023 1158/JJM 09/03/2023 0 AIKYATAN DEVELOPMENT SOCIETY 0.33 0.00 0 0
4886 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Salary of Lab personnel (Chemist/Bacteriologist and Lab Assistant) of NGO managed laboratory for the month of November'2022. BILL/00205/2022-2023 1065/JJM 13/02/2023 0 AIKYATAN DEVELOPMENT SOCIETY 0.33 0.00 0 0
4887 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Festival Bonus F.Y.-2021-2022 BILL/00207/2022-2023 1068/JJM 15/02/2023 0 AIKYATAN DEVELOPMENT SOCIETY 0.14 0.00 0 0
4888 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Salary of Lab personnel of NGO managed laboratory under Burdwan Division, PHE Dte. for the month of December'22. BILL/00354/2022-2023 1157/JJM 09/03/2023 0 SHASTRI SMRITI SANGHA 0.31 0.00 0 0
4889 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Maintenance charges bill for the period January'22 to June'22. BILL/00534/2022-2023 52/JJM 27/04/2023 0 AIKYATAN DEVELOPMENT SOCIETY 0.40 0.00 0 0
4890 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP NGO Salary bill for the month of February'23. BILL/00554/2022-2023 12/JJM 17/04/2023 0 SHASTRI SMRITI SANGHA 0.45 0.00 0 0
4891 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Salary of NGO Lab personnel (Chemist/Bacteriologist and Lab Assistant) for the month of March'23. BILL/00069/2023-2024 170/JJM 26/05/2023 0 SHASTRI SMRITI SANGHA 0.45 0.00 0 0
4892 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Salary of NGO Lab personnel (Chemist/Bacteriologist and Lab Assistant) for the month of March'23. BILL/00078/2023-2024 168/JJM 26/05/2023 0 DR CHATTERJEES VILLAGE WELFARE SOCIETY 0.45 0.00 0 0
4893 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Salary bill of NGO for the month of October & November 2023. BILL/01071/2023-2024 1066/JJM 13/12/2023 0 AIKYATAN DEVELOPMENT SOCIETY 0.90 0.00 0 0
4894 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Payment for NGO Lab personnel (Chemist/Bacteriologist and Lab Assistant) for the month of October'2022. BILL/00131/2022-2023 946/JJM/22-23 09/01/2023 0 SHASTRI SMRITI SANGHA 0.26 0.00 0 0
4895 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Salary of Lab personnel of NGO managed laboratory under Burdwan Division, PHE Dte. for the month of January'23. BILL/00357/2022-2023 1160/JJM 09/03/2023 0 AIKYATAN DEVELOPMENT SOCIETY 0.45 0.00 0 0
4896 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP NGO Salary bill for the month of February'23. BILL/00552/2022-2023 10/JJM 17/04/2023 0 DR CHATTERJEES VILLAGE WELFARE SOCIETY 0.45 0.00 0 0
4897 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Maintenance of NGO managed laboratory for the period July'22 to December'22. BILL/00133/2023-2024 381/JJM 19/07/2023 0 AIKYATAN DEVELOPMENT SOCIETY 0.35 0.00 0 0
4898 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Maintenance charges bill for the Period January'22 to June'22. BILL/00533/2022-2023 52/JJM 27/04/2023 0 SHASTRI SMRITI SANGHA 0.40 0.00 0 0
4899 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Salary of NGO for the month of May'23. BILL/00375/2023-2024 514/JJM 16/08/2023 0 AIKYATAN DEVELOPMENT SOCIETY 0.45 0.00 0 0
4900 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Salary of NGO Lab for the month of August'23. BILL/00660/2023-2024 754/JJM 11/10/2023 0 SHASTRI SMRITI SANGHA 0.45 0.00 0 0
4901 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Salary of Lab personnel of NGO managed laboratory for the month of September'23 and festival bonus. BILL/00869/2023-2024 878/JJM 10/11/2023 0 AIKYATAN DEVELOPMENT SOCIETY 0.61 0.00 0 0
4902 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Payment of NGO lab personnel (Chemist/Bacteriologist and Lab Assistant) for the month of April'23. BILL/00103/2023-2024 198/JJM 31/05/2023 0 SHASTRI SMRITI SANGHA 0.45 0.00 0 0
4903 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Maintenance of NGO managed laboratory for the period July'22 to December'22. BILL/00134/2023-2024 382/JJM 19/07/2023 0 SHASTRI SMRITI SANGHA 0.35 0.00 0 0
4904 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Salary of NGO for the month of May'23. BILL/00374/2023-2024 515/JJM 16/08/2023 0 SHASTRI SMRITI SANGHA 0.45 0.00 0 0
4905 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Salary of NGO for the month of May'23. BILL/00373/2023-2024 513/JJM 16/08/2023 0 DR CHATTERJEES VILLAGE WELFARE SOCIETY 0.45 0.00 0 0
4906 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Salary bill for the month of October & November'2023. BILL/01070/2023-2024 1065/JJM 13/12/2023 0 DR CHATTERJEES VILLAGE WELFARE SOCIETY 0.90 0.00 0 0
4907 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Festival Bonus F.Y.-2021-2022 BILL/00208/2022-2023 1069/JJM 15/02/2023 0 SHASTRI SMRITI SANGHA 0.10 0.00 0 0
4908 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Maintenance charges bill for the period January'2022 to June'2022. BILL/00532/2022-2023 53/JJM 27/04/2023 0 DR CHATTERJEES VILLAGE WELFARE SOCIETY 0.40 0.00 0 0
4909 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Salary of NGO Lab personnel (Chemist/Bacteriologist and Lab Assistant) for the month of March'23. BILL/00068/2023-2024 169/JJM 26/05/2023 0 AIKYATAN DEVELOPMENT SOCIETY 0.45 0.00 0 0
4910 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Salary of NGO Lab for the month of August'23. BILL/00658/2023-2024 756/JJM 11/10/2023 0 DR CHATTERJEES VILLAGE WELFARE SOCIETY 0.45 0.00 0 0
4911 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Payment for NGO Lab personnel (Chemist/Bacteriologist and Lab Assistant) for the month of October'2022. BILL/00129/2022-2023 944/JJM/22-23 09/01/2023 0 AIKYATAN DEVELOPMENT SOCIETY 0.33 0.00 0 0
4912 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Salary of Lab personnel (Chemist/Bacteriologist and Lab Assistant) of NGO managed laboratory for the month of November'2022. BILL/00204/2022-2023 1066/JJM 13/02/2023 0 SHASTRI SMRITI SANGHA 0.31 0.00 0 0
4913 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Salary of Lab personnel of NGO managed laboratory under Burdwan Division, PHE Dte. for the month of January'23. BILL/00358/2022-2023 1161/JJM 09/03/2023 0 SHASTRI SMRITI SANGHA 0.45 0.00 0 0
4914 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Salary of NGO Lab for the month of August'23. BILL/00659/2023-2024 755/JJM 11/10/2023 0 AIKYATAN DEVELOPMENT SOCIETY 0.45 0.00 0 0
4915 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Payment for NGO Lab personnel (Chemist/Bacteriologist and Lab Assistant) for the month of October'2022. BILL/00130/2022-2023 945/JJM/22-23 09/01/2023 0 DR CHATTERJEES VILLAGE WELFARE SOCIETY 0.33 0.00 0 0
4916 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP NGO Salary bill for the month of February'23. BILL/00553/2022-2023 11/JJM 17/04/2023 0 AIKYATAN DEVELOPMENT SOCIETY 0.45 0.00 0 0
4917 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Payment of NGO lab personnel (Chemist/Bacteriologist and Lab Assistant) for the month of April'23. BILL/00101/2023-2024 196/JJM 31/05/2023 0 DR CHATTERJEES VILLAGE WELFARE SOCIETY 0.45 0.00 0 0
4918 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Payment of NGO lab personnel (Chemist/Bacteriologist and Lab Assistant) for the month of April'23. BILL/00102/2023-2024 197/JJM 31/05/2023 0 AIKYATAN DEVELOPMENT SOCIETY 0.45 0.00 0 0
4919 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Maintenance of NGO managed laboratory for the period July'22 to December'22. BILL/00135/2023-2024 380/JJM 19/07/2023 0 DR CHATTERJEES VILLAGE WELFARE SOCIETY 0.35 0.00 0 0
4920 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Maintenance of NGO managed laboratory for the period January'22 to June'22. BILL/00432/2023-2024 594/JJM 31/08/2023 0 SIKSHA-NIKATAN 0.21 0.00 0 0
4921 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Salary of Lab personnel of NGO managed laboratory for the month of September'23 and festival bonus. BILL/00871/2023-2024 880/JJM 10/11/2023 0 SHASTRI SMRITI SANGHA 0.61 0.00 0 0
4922 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Continuation work order for "Engagement of laboratory personnel (Chemist , Bacteriologist and Lab Assistant) in Parulia Sub District Water Testing Laboratory & Kamalnagar WTP laboratory within Kalna Sub-Division under Burdwan Division, P.H.E. Dte., Purba Bardhaman. [Period from 01.05.2023 to 31.05.2023]" Assistant Engineer JUNIOR ENGINEER R.W.S. BURDWAN SUB-DIVISION PHE DTE ORD/000185/2023-2024 370/KSD 25/04/2023 31 SURATH DEY 0.59 0.00 0 0
4923 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Engagement of Laboratory personnel (Chemist/Bacteriologist and Lab Assistant) including maintenance in 2 Nos. Sub District Laboratories within Burdwan Sadar Sub Division under Burdwan Division, PHE Dte., Purba Bardhaman. [Period For Six Months i.e. 01.06.2023 to 30.11.2023]._2ND CALL. ORD/000163/2023-2024 2451/BWD 31/05/2023 183 DULAL MAJUMDER 6.99 6.26 89.56 100
4924 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Arrangement of drinking water supply in SHAKTIGARH Water Testing Laboratory by sinking of 75Mtr. Deep 40 x 100 mm. dia., with PVC pipe, DWP Tube wells in the district of Purba Bardhaman under Burdwan Division, PHE. Dte. AE(HQs) J.E. 2 BURDWAN ORD/000354/2023-2024 350/AE/HQ 18/07/2023 30 A R TRADERS 0.77 0.77 100 100
4925 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Arrangement of drinking water supply in SANKARI Water Testing Laboratory by sinking of 75 Mtr. Deep 40 x 100 mm. dia., with PVC pipe, DWP Tube wells in the district of Purba Bardhaman under Burdwan Division, PHE. Dte. AE(HQs) J.E. 2 BURDWAN ORD/000358/2023-2024 354/AE/HQ 18/07/2023 30 SOUMYAVASH DAS 0.96 0.94 97.92 100
4926 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Arrangement of drinking water supply in ANUKHAL Water Testing Laboratory by sinking of 75 Mtr. Deep 40 x 100 mm. dia., with PVC pipe, DWP Tube wells in the district of Purba Bardhaman under Burdwan Division, PHE. Dte. AE(HQs) J.E. 2 BURDWAN ORD/000360/2023-2024 356/AE/HQ 18/07/2023 30 M/S F.S. ENTERPRISE 0.96 0.96 100 100
4927 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Arrangement of drinking water supply in MONTESWAR Water Testing Laboratory by sinking of 75 Mtr. Deep 40 x 100 mm. dia., with PVC pipe, DWP Tube wells in the district of Purba Bardhaman under Burdwan Division, PHE. Dte. AE(HQs) J.E. 2 BURDWAN ORD/000362/2023-2024 358/AE/HQ 18/07/2023 30 SUPRIYA RAY 0.88 0.88 100 100
4928 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Arrangement of drinking water supply in BARSHUL Water Testing Laboratory by sinking of 75 Mtr. Deep 40 x 100 mm. dia., with PVC pipe, DWP Tube wells in the district of Purba Bardhaman under Burdwan Division, PHE. Dte. AE(HQs) J.E. 2 BURDWAN ORD/000357/2023-2024 353/AE/HQ 18/07/2023 30 ANWESHA CONSTRUCTION 0.80 0.79 98.75 100
4929 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Arrangement of drinking water supply in SEHERA Water Testing Laboratory by sinking of 75 Mtr. Deep 40 x 100 mm. dia., with PVC pipe, DWP Tube wells in the district of Purba Bardhaman under Burdwan Division, PHE. Dte. AE(HQs) J.E. 2 BURDWAN,Junior Engineer, Burdwan Division ORD/000356/2023-2024 352/AE/HQ 18/07/2023 30 RUPALI ENTERPRISE 0.96 0.95 98.96 100
4930 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Arrangement of drinking water supply in GANGANANDAPUR Water Testing Laboratory by sinking of 75 Mtr. Deep 40 x 100 mm. dia., with PVC pipe, DWP Tube wells in the district of Purba Bardhaman under Burdwan Division, PHE. Dte. AE(HQs) J.E. 2 BURDWAN ORD/000359/2023-2024 355/AE/HQ 18/07/2023 30 DEBJYOTI GOSWAMI 0.96 0.95 98.96 100
4931 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Continuation Work Order for Annual Maintenance Contract (AMC) for software upgradation and other software related issues in existing computers, refilling of Cartridge of the printers, replacement of battery of UPS in District, Sub-Dist. and NGO Laboratories under Burdwan Division, P.H.E. Dte. [Period from 01.08.2023 to 31.01.2024] AE(HQs) J.E. 1 BURDWAN ORD/000414/2023-2024 396/AE/HQ 27/07/2023 184 COMPUTER MEDIA 0.99 0.99 100 100
4932 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP SALARY OF NGO LAB PERSONNEL FOR THE MONTH OF DECEMBER'2023. BILL/01367/2023-2024 1286/JJM 29/01/2024 0 DR CHATTERJEES VILLAGE WELFARE SOCIETY 0.45 0.00 0 0
4933 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP SALARY OF NGO LAB PERSONNEL FOR THE MONTH OF DECEMBER'2023. BILL/01368/2023-2024 1287/JJM 29/01/2024 0 SHASTRI SMRITI SANGHA 0.45 0.00 0 0
4934 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Salary for the month of February'2024. BILL/01908/2023-2024 1711/JJM 20/03/2024 0 DR CHATTERJEES VILLAGE WELFARE SOCIETY 0.45 0.00 0 0
4935 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Salary for the month of February'2024. BILL/01909/2023-2024 1712/JJM 20/03/2024 0 AIKYATAN DEVELOPMENT SOCIETY 0.45 0.00 0 0
4936 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Maintenance charges for the period July'23 to December'23. BILL/01911/2023-2024 1708/JJM 20/03/2024 0 SHASTRI SMRITI SANGHA 0.35 0.00 0 0
4937 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Salary of NGO Lab Personnel for the month of January'2024. BILL/01698/2023-2024 1379/JJM 21/02/2024 0 AIKYATAN DEVELOPMENT SOCIETY 0.45 0.00 0 0
4938 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Maintenance charges bill for the month of January'23 to June'23. BILL/01369/2023-2024 1377/JJM 21/02/2024 0 SHASTRI SMRITI SANGHA 0.40 0.00 0 0
4939 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Salary of NGO Lab Personnel for the month of January'2024. BILL/01699/2023-2024 1378/JJM 21/02/2024 0 SHASTRI SMRITI SANGHA 0.45 0.00 0 0
4940 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP SALARY OF NGO LAB PERSONNEL FOR THE MONTH OF DECEMBER'2023. BILL/01366/2023-2024 1285/JJM 29/01/2024 0 AIKYATAN DEVELOPMENT SOCIETY 0.45 0.00 0 0
4941 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Maintenance charges for the period JANUARY'23 to DECEMBER'23. BILL/01912/2023-2024 1709-10/JJM 20/03/2024 0 DR CHATTERJEES VILLAGE WELFARE SOCIETY 0.75 0.00 0 0
4942 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Maintenance charges bill for the period January to June 2023. BILL/01370/2023-2024 1376/JJM 21/02/2024 0 AIKYATAN DEVELOPMENT SOCIETY 0.40 0.00 0 0
4943 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Salary of NGO Lab Personnel for the month of January'2024. BILL/01697/2023-2024 1380/JJM 21/02/2024 0 DR CHATTERJEES VILLAGE WELFARE SOCIETY 0.45 0.00 0 0
4944 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Salary for the month of February'2024. BILL/01910/2023-2024 1713/JJM 20/03/2024 0 SHASTRI SMRITI SANGHA 0.45 0.00 0 0
4945 PURBA BARDHAMAN Burdwan Division OPERATIONAL CHARGES OF PHED & NGO MANAGED LABORATORIES RELATED WATER QUALITY MONITORING & SURVEILLANCE UNDER JAL JEEVAN MISSION , SM/11857 Support-WQMSP Engagement of Laboratory personnel (Chemist/Bacteriologist and Lab Assistant) in 1 No. Sub District Laboratory (Banonabagram Sub District Laboratory) within Durgapur Sub Division under Burdwan Division, PHE Dte., Purba Bardhaman. [Period 01/08/2022 to 31/12/2023] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte JUNIOR ENGINEER DURGAPUR SUB-DIVISION PHE DTE,Junior Engineer1, Durgapur Sub-Division, PHE Dte. ORD/000309/2022-2023 463/DSD 29/07/2022 518 CLIFFORD FACILITY SERVICES PVT.LTD. 4.55 3.77 82.86 72
4946 PURBA BARDHAMAN Burdwan Division Operational charges of PHED & NGO Managed Laboratories related to Water Quality Monitoring & Surveillance under Jal Jeevan Mission , SM/19071 Support-WQMSP Supply of Inverter Battery, MS Rack, office table and Plastic Chair for 14 Nos. laboratory under Burdwan Division, PHE. Dte. AE(HQs) J.E. 1 BURDWAN ORD/001033/2023-2024 102/AE/HQ 19/02/2024 30 SANDIPAN SENGUPTA 8.79 5.74 65.3 20
4947 PURBA BARDHAMAN Burdwan Division Operational charges of PHED & NGO Managed Laboratories related to Water Quality Monitoring & Surveillance under Jal Jeevan Mission , SM/19071 Support-WQMSP Continuation work order for Annual Maintenance Contract (AMC) for software upgradation and other software related issues in existing computers, refilling of Cartridge of the printers, replacement of battery of UPS in District, Sub-Dist. and NGO Laboratories under Burdwan Division, P.H.E. Dte. [Period from 01.02.2024 to 31.07.2024] AE(HQs) J.E. 1 BURDWAN ORD/001018/2023-2024 46/AE/HQ 29/01/2024 182 COMPUTER MEDIA 0.99 0.99 100 100
4948 PURBA BARDHAMAN Burdwan Division Operational charges of PHED & NGO Managed Laboratories related to Water Quality Monitoring & Surveillance under Jal Jeevan Mission , SM/19071 Support-WQMSP Engagement of 4 Nos Laboratory personnel (Analyst) at 4 Nos Water Testing Laboratories under Burdwan Division, PHE Dte [Period: One Month (01.03.24 to 31.03.24)] AE(HQs) J.E. 1 BURDWAN ORD/001214/2023-2024 133/AE/HQ 28/02/2024 31 DULAL MAJUMDER 0.87 0.87 100 100
4949 PURBA BARDHAMAN Burdwan Division Operational charges of PHED & NGO Managed Laboratories related to Water Quality Monitoring & Surveillance under Jal Jeevan Mission , SM/19071 Support-WQMSP Continuation work for Engagement of 4 Nos Laboratory personnel (Analyst) at 4 Nos Water Testing Laboratories under Burdwan Division, PHE Dte [Period:One Month (01.04.24 to 30.04.24)] AE(HQs) J.E. 1 BURDWAN ORD/001216/2023-2024 234/AE/HQ 28/03/2024 30 DULAL MAJUMDER 0.87 0.87 100 100
4950 PURBA BARDHAMAN Burdwan Division Operational charges of PHED & NGO Managed Laboratories related to Water Quality Monitoring & Surveillance under Jal Jeevan Mission , SM/19071 Support-WQMSP Continuation work for Engagement of Laboratory personnel (Chemist/Bacteriologist and Lab Assistant) including maintenance in 4 Nos. Sub District Laboratories within Kalna Sub Division under Burdwan Division, PHE Dte., Purba Bardhaman. [Period from 01.06.2024 to 31.07.2024] Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000433/2024-2025 2007/BWD 30/05/2024 61 DULAL MAJUMDER 5.04 5.04 100 100
4951 PURBA BARDHAMAN Burdwan Division Operational charges of PHED & NGO Managed Laboratories related to Water Quality Monitoring & Surveillance under Jal Jeevan Mission , SM/19071 Support-WQMSP Installation of Aquaguard purifier at 03 (Three) nos Laboratories (SDWTL) (Satgachia, Monteswar, Parulia) under Burdwan Division, PHE Dte. Contractual Junior Engineer ORD/000253/2024-2025 193/RWS 18/06/2024 7 DAS ENTERPRISE 0.72 0.72 100 100
4952 PURBA BARDHAMAN Burdwan Division Operational charges of PHED & NGO Managed Laboratories related to Water Quality Monitoring & Surveillance under Jal Jeevan Mission , SM/19071 Support-WQMSP Installation of Aquaguard purifier at 03 (Three) nos Laboratories (SDWTL) (Saktigarh, Ganganandapur, Bonnobogram) under Burdwan Division, PHE Dte. Contractual Junior Engineer ORD/000254/2024-2025 194/RWS 18/06/2024 7 KHUSI BHAKAT 0.73 0.73 100 100
4953 PURBA BARDHAMAN Burdwan Division Operational charges of PHED & NGO Managed Laboratories related to Water Quality Monitoring & Surveillance under Jal Jeevan Mission , SM/19071 Support-WQMSP Engagement of 1 No. Laboratory Assistant at Bonnabagram Water Testing Laboratories under Burdwan Division, PHE Dte [Period: For Four Months (01.03.24 to 30.06.24)] AE(HQs) J.E. 1 BURDWAN ORD/001223/2023-2024 131/AE/HQ 27/02/2024 121 DULAL MAJUMDER 0.63 0.63 100 100
4954 PURBA BARDHAMAN Burdwan Division Operational charges of PHED & NGO Managed Laboratories related to Water Quality Monitoring & Surveillance under Jal Jeevan Mission , SM/19071 Support-WQMSP Continuation work for Engagement of 4 Nos Laboratory personnel (Analyst) at 3 Nos Water Testing Laboratories under Burdwan Division, PHE Dte. [Period: For One Month (01.06.24 to 30.06.24)] AE(HQs) J.E. 1 BURDWAN ORD/000112/2024-2025 299/AE/HQ 30/05/2024 30 DULAL MAJUMDER 0.87 0.87 100 100
4955 PURBA BARDHAMAN Burdwan Division Operational charges of PHED & NGO Managed Laboratories related to Water Quality Monitoring & Surveillance under Jal Jeevan Mission , SM/19071 Support-WQMSP Continuation work for Engagement of laboratory personnels i.e. Chemist (One Person), Additional Chemist (One person), Bacteriologist (One Person), Laboratory Assistant (One Person), Sampling Assistant (One Person) and Computer Operator/Data Entry Operator (One Person) for Burdwan District Laboratory under Burdwan Division P.H.E Dte. at PHE Complex, Nababhat, Purba Bardhaman. [Period for 6 (Six) Months i.e. 01.06.2024 to 30.11.2024] ASSISTANT ENGINEER R.W.S. BURDWAN SUB-DIVISION PHE DTE Contractual Junior Engineer ORD/000577/2024-2025 1997/BWD 30/05/2024 184 ALAKA GHOSH 7.67 7.67 100 100
4956 PURBA BARDHAMAN Burdwan Division Operational charges of PHED & NGO Managed Laboratories related to Water Quality Monitoring & Surveillance under Jal Jeevan Mission , SM/19071 Support-WQMSP Installation of Aquaguard purifier at 03 (Three) nos Laboratories (SDWTL) (Sehara, Sankari, Anukhal) under Burdwan Division, PHE Dte. Contractual Junior Engineer ORD/000250/2024-2025 192/RWS 18/06/2024 7 GHOSH ENTERPRISE 0.72 0.72 100 100
4957 PURBA BARDHAMAN Burdwan Division Operational charges of PHED & NGO Managed Laboratories related to Water Quality Monitoring & Surveillance under Jal Jeevan Mission , SM/19071 Support-WQMSP Engagement of 4 Nos Laboratory personnel (Analyst) at 3 Nos Water Testing Laboratories under Burdwan Division, PHE Dte. [Period: For One Month (01.03.24 to 31.03.24)] AE(HQs) J.E. 1 BURDWAN ORD/001215/2023-2024 134/AE/HQ 28/02/2024 31 DULAL MAJUMDER 0.87 0.87 100 100
4958 PURBA BARDHAMAN Burdwan Division Operational charges of PHED & NGO Managed Laboratories related to Water Quality Monitoring & Surveillance under Jal Jeevan Mission , SM/19071 Support-WQMSP Continuation work for Engagement of 4 Nos Laboratory personnel (Analyst) at 4 Nos Water Testing Laboratories under Burdwan Division, PHE Dte [Period:One Month (01.05.24 to 31.05.24)] AE(HQs) J.E. 1 BURDWAN ORD/000109/2024-2025 275/AE/HQ 30/04/2024 31 DULAL MAJUMDER 0.87 0.87 100 100
4959 PURBA BARDHAMAN Burdwan Division Operational charges of PHED & NGO Managed Laboratories related to Water Quality Monitoring & Surveillance under Jal Jeevan Mission , SM/19071 Support-WQMSP Repair & renovation of Barsul Sub District Water Testing Laboratory under Burdwan Division, P.H.E. Dte. J.E. 1 BURDWAN ORD/001068/2023-2024 1018/AE/HQ 28/12/2023 30 PRATIVA CONSTRUCTION 4.24 4.13 97.41 100
4960 PURBA BARDHAMAN Burdwan Division Operational charges of PHED & NGO Managed Laboratories related to Water Quality Monitoring & Surveillance under Jal Jeevan Mission , SM/19071 Support-WQMSP Installation of Aquaguard purifier at Four nos Laboratories (SDWTL) (Dr. ChatterjeeVWS,Aikyatan,Shastri Smriti Sangha,Barshul) under Burdwan Division, PHE Dte. ASSISTANT ENGINEER R.W.S. BURDWAN SUB-DIVISION PHE DTE Junior Engineer, Burdwan Sadar Sub-Division ORD/001088/2023-2024 98/RWS 13/03/2024 15 KHUSI BHAKAT 0.88 0.85 96.59 100
4961 PURBA BARDHAMAN Burdwan Division Operational charges of PHED & NGO Managed Laboratories related to Water Quality Monitoring & Surveillance under Jal Jeevan Mission , SM/19071 Support-WQMSP Continuation work for Engagement of Laboratory personnel (Chemist/Bacteriologist and Lab Assistant) including maintenance in 3 Nos. Sub District Laboratories within Headquarters under Burdwan Division, PHE Dte., Purba Bardhaman. [Period from 01.03.2024 to 31.05.2024] AE(HQs) J.E. 1 BURDWAN ORD/001153/2023-2024 812/BWD 27/02/2024 90 DULAL MAJUMDER 5.30 5.30 100 100
4962 PURBA BARDHAMAN Burdwan Division Operational charges of PHED & NGO Managed Laboratories related to Water Quality Monitoring & Surveillance under Jal Jeevan Mission , SM/19071 Support-WQMSP Continuation work for Engagement of Laboratory personnel (Chemist/Bacteriologist and Lab Assistant) including maintenance in 2 Nos. Sub District Laboratories within Burdwan Sadar Sub Division under Burdwan Division, PHE Dte., Purba Bardhaman. [Period from 01.03.2024 to 31.05.2024] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/001156/2023-2024 830/BWD 28/02/2024 90 DULAL MAJUMDER 2.99 2.99 100 100
4963 PURBA BARDHAMAN Burdwan Division Operational charges of PHED & NGO Managed Laboratories related to Water Quality Monitoring & Surveillance under Jal Jeevan Mission , SM/19071 Support-WQMSP Continuation work for Engagement of Laboratory personnel (Chemist/Bacteriologist and Lab Assistant) including maintenance in 4 Nos. Sub District Laboratories within Kalna Sub Division under Burdwan Division, PHE Dte., Purba Bardhaman. [Period from 01.03.2024 to 31.05.2024] Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/001157/2023-2024 858/BWD 29/02/2024 92 DULAL MAJUMDER 7.59 7.59 100 50
4964 PURBA BARDHAMAN Burdwan Division Operational charges of PHED & NGO Managed Laboratories related to Water Quality Monitoring & Surveillance under Jal Jeevan Mission , SM/19071 Support-WQMSP Continuation work for Engagement of Laboratory personnel (Sampling Assistant) in Bananabagram Sub District Laboratory within Headquarters under Burdwan Division, PHE Dte., Purba Bardhaman. [Period for 01.03.2024 to 31.05.2024]. AE(HQs) J.E. 1 BURDWAN ORD/001158/2023-2024 145/AE/HQ 28/02/2024 90 DULAL MAJUMDER 0.37 0.37 100 100
4965 PURBA BARDHAMAN Burdwan Division Operational charges of PHED & NGO Managed Laboratories related to Water Quality Monitoring & Surveillance under Jal Jeevan Mission , SM/19071 Support-WQMSP Supply of Materials required for maintaining NABL Accreditation as per ISO:I 17025:2017 of Bardhaman District water testing Laboratory, PHED, Govt of West Bengal. Junior Engineer, R.W.S. Burdwan Sub Division, P.H.E. Dt ORD/000081/2024-2025 151/RWS 26/04/2024 7 BHARATI CHEMICAL AND SCIENTIFIC WORKS 0.79 0.79 100 100
4966 PURBA BARDHAMAN Burdwan Division Operational charges of PHED & NGO Managed Laboratories related to Water Quality Monitoring & Surveillance under Jal Jeevan Mission , SM/19071 Support-WQMSP Installation of Aquaguard purifier at District Laboratory with meeting hall at Nababhat P.H.E. Complex within RWS Burdwan Sub-Division, under Burdwan Division. ASSISTANT ENGINEER R.W.S. BURDWAN SUB-DIVISION PHE DTE Junior Engineer, R.W.S. Burdwan Sub Division, P.H.E. Dt ORD/001176/2023-2024 05/RWS 05/01/2024 7 KHUSI BHAKAT 0.21 0.20 95.24 100
4967 PURBA BARDHAMAN Burdwan Division Operational charges of PHED & NGO Managed Laboratories related to Water Quality Monitoring & Surveillance under Jal Jeevan Mission , SM/19071 Support-WQMSP Continuation work for Engagement of 4 Nos Laboratory personnel (Analyst) at 4 Nos Water Testing Laboratories under Burdwan Division, PHE Dte [Period:One Month (01.06.24 to 30.06.24)] AE(HQs) J.E. 1 BURDWAN ORD/000111/2024-2025 298/AE/HQ 30/05/2024 30 DULAL MAJUMDER 0.87 0.87 100 100
4968 PURBA BARDHAMAN Burdwan Division Operational charges of PHED & NGO Managed Laboratories related to Water Quality Monitoring & Surveillance under Jal Jeevan Mission , SM/19071 Support-WQMSP Supply of Residual Chlorine Kit, Iron Test Kit and Sample Collection Bottle for Burdwan District Laboratory under Burdwan Division, PHE Dte., Purba Bardhaman. AE(HQs) J.E. 1 BURDWAN ORD/000697/2024-2025 863/AE/HQ 24/10/2024 15 ALAKA GHOSH 1.00 1.00 100 100
4969 PURBA BARDHAMAN Burdwan Division Operational charges of PHED & NGO Managed Laboratories related to Water Quality Monitoring & Surveillance under Jal Jeevan Mission , SM/19071 Support-WQMSP Continuation work for Engagement of 4 Nos Laboratory personnel (Analyst) at 3 Nos Water Testing Laboratories under Burdwan Division, PHE Dte. [Period: For One Month (01.04.24 to 30.04.24)] AE(HQs) J.E. 1 BURDWAN ORD/001217/2023-2024 235/AE/HQ 28/03/2024 30 DULAL MAJUMDER 0.87 0.87 100 100
4970 PURBA BARDHAMAN Burdwan Division Operational charges of PHED & NGO Managed Laboratories related to Water Quality Monitoring & Surveillance under Jal Jeevan Mission , SM/19071 Support-WQMSP Continuation work for Engagement of 4 Nos Laboratory personnel (Analyst) at 3 Nos Water Testing Laboratories under Burdwan Division, PHE Dte. [Period: For One Month (01.05.24 to 31.05.24)] AE(HQs) J.E. 1 BURDWAN ORD/000110/2024-2025 276/AE/HQ 30/04/2024 31 DULAL MAJUMDER 0.87 0.87 100 100
4971 PURBA BARDHAMAN Burdwan Division Operational charges of PHED & NGO Managed Laboratories related to Water Quality Monitoring & Surveillance under Jal Jeevan Mission , SM/19071 Support-WQMSP Salary payment for the month of March'2024. BILL/00191/2024-2025 295/JJM 29/05/2024 0 DR CHATTERJEES VILLAGE WELFARE SOCIETY 0.45 0.00 0 0
4972 PURBA BARDHAMAN Burdwan Division Operational charges of PHED & NGO Managed Laboratories related to Water Quality Monitoring & Surveillance under Jal Jeevan Mission , SM/19071 Support-WQMSP Monthly Remuneration Of Lab Personnel For The Month Of September 2024 BILL/00905/2024-2025 1044/JJM 30/10/2024 0 AIKYATAN DEVELOPMENT SOCIETY 0.45 0.00 0 0
4973 PURBA BARDHAMAN Burdwan Division Operational charges of PHED & NGO Managed Laboratories related to Water Quality Monitoring & Surveillance under Jal Jeevan Mission , SM/19071 Support-WQMSP SALARY BILL FOR THE MONTH OF MAY-2024' BILL/00262/2024-2025 459/JJM 02/07/2024 0 AIKYATAN DEVELOPMENT SOCIETY 0.45 0.00 0 0
4974 PURBA BARDHAMAN Burdwan Division Operational charges of PHED & NGO Managed Laboratories related to Water Quality Monitoring & Surveillance under Jal Jeevan Mission , SM/19071 Support-WQMSP Salary Bill For The Month Of September 2024 BILL/00906/2024-2025 1043/JJM 30/10/2024 0 SHASTRI SMRITI SANGHA 0.45 0.00 0 0
4975 PURBA BARDHAMAN Burdwan Division Operational charges of PHED & NGO Managed Laboratories related to Water Quality Monitoring & Surveillance under Jal Jeevan Mission , SM/19071 Support-WQMSP Remuneration of Laboratory Personal for the month April-2024 BILL/00261/2024-2025 370/JJM 21/06/2024 0 AIKYATAN DEVELOPMENT SOCIETY 0.45 0.00 0 0
4976 PURBA BARDHAMAN Burdwan Division Operational charges of PHED & NGO Managed Laboratories related to Water Quality Monitoring & Surveillance under Jal Jeevan Mission , SM/19071 Support-WQMSP Festival Bonus of lab personnel BILL/00898/2024-2025 1032/JJM 25/10/2024 0 AIKYATAN DEVELOPMENT SOCIETY 0.18 0.00 0 0
4977 PURBA BARDHAMAN Burdwan Division Operational charges of PHED & NGO Managed Laboratories related to Water Quality Monitoring & Surveillance under Jal Jeevan Mission , SM/19071 Support-WQMSP Laboratory contingency charges bill [Period January'22 to June'22] BILL/00282/2024-2025 446/JJM 02/07/2024 0 SIDHU KANU GRAM UNNAYAN SAMITY 0.40 0.00 0 0
4978 PURBA BARDHAMAN Burdwan Division Operational charges of PHED & NGO Managed Laboratories related to Water Quality Monitoring & Surveillance under Jal Jeevan Mission , SM/19071 Support-WQMSP Monthly remuneration of lab personnel for the month of July 2024 BILL/00567/2024-2025 757/JJM 30/08/2024 0 AIKYATAN DEVELOPMENT SOCIETY 0.45 0.00 0 0
4979 PURBA BARDHAMAN Burdwan Division Operational charges of PHED & NGO Managed Laboratories related to Water Quality Monitoring & Surveillance under Jal Jeevan Mission , SM/19071 Support-WQMSP SALARY BILL FOR THE MONTH OF MAY-2024. BILL/00264/2024-2025 460/JJM 02/07/2024 0 DR CHATTERJEES VILLAGE WELFARE SOCIETY 0.45 0.00 0 0
4980 PURBA BARDHAMAN Burdwan Division Operational charges of PHED & NGO Managed Laboratories related to Water Quality Monitoring & Surveillance under Jal Jeevan Mission , SM/19071 Support-WQMSP Grant The Remuneration Of Lab Staff For The Month Of November-2024 BILL/01095/2024-2025 1175/JJM 17/12/2024 0 DR CHATTERJEES VILLAGE WELFARE SOCIETY 0.45 0.00 0 0
4981 PURBA BARDHAMAN Burdwan Division Operational charges of PHED & NGO Managed Laboratories related to Water Quality Monitoring & Surveillance under Jal Jeevan Mission , SM/19071 Support-WQMSP MAINTENANCE CHARGE FOR THE MONTH OF JANUARY 2024 TO JUNE 2024(6 MONTH) BILL/00951/2024-2025 1049/JJM 05/11/2024 0 SHASTRI SMRITI SANGHA 0.40 0.00 0 0
4982 PURBA BARDHAMAN Burdwan Division Operational charges of PHED & NGO Managed Laboratories related to Water Quality Monitoring & Surveillance under Jal Jeevan Mission , SM/19071 Support-WQMSP Salary Bill for the month of August- 2024 BILL/00675/2024-2025 858/JJM 20/09/2024 0 SHASTRI SMRITI SANGHA 0.45 0.00 0 0
4983 PURBA BARDHAMAN Burdwan Division Operational charges of PHED & NGO Managed Laboratories related to Water Quality Monitoring & Surveillance under Jal Jeevan Mission , SM/19071 Support-WQMSP Grant The Remuneration Of Lab Staff For The Month Of October-2024. BILL/01005/2024-2025 1086/JJM 29/11/2024 0 DR CHATTERJEES VILLAGE WELFARE SOCIETY 0.45 0.00 0 0
4984 PURBA BARDHAMAN Burdwan Division Operational charges of PHED & NGO Managed Laboratories related to Water Quality Monitoring & Surveillance under Jal Jeevan Mission , SM/19071 Support-WQMSP Salary Bill for the month of April-2024 BILL/00259/2024-2025 371/JJM 21/06/2024 0 SHASTRI SMRITI SANGHA 0.45 0.00 0 0
4985 PURBA BARDHAMAN Burdwan Division Operational charges of PHED & NGO Managed Laboratories related to Water Quality Monitoring & Surveillance under Jal Jeevan Mission , SM/19071 Support-WQMSP Salary bill for the month of July 2024 BILL/00568/2024-2025 757/JJM 30/08/2024 0 SHASTRI SMRITI SANGHA 0.45 0.00 0 0
4986 PURBA BARDHAMAN Burdwan Division Operational charges of PHED & NGO Managed Laboratories related to Water Quality Monitoring & Surveillance under Jal Jeevan Mission , SM/19071 Support-WQMSP Grant The Festival Bonus For Laboratory personnel BILL/00900/2024-2025 1034/JJM 25/10/2024 0 DR CHATTERJEES VILLAGE WELFARE SOCIETY 0.18 0.00 0 0
4987 PURBA BARDHAMAN Burdwan Division Operational charges of PHED & NGO Managed Laboratories related to Water Quality Monitoring & Surveillance under Jal Jeevan Mission , SM/19071 Support-WQMSP Salary Bill For The Month Of November-2024 BILL/01093/2024-2025 1174/JJM 17/12/2024 0 SHASTRI SMRITI SANGHA 0.45 0.00 0 0
4988 PURBA BARDHAMAN Burdwan Division Operational charges of PHED & NGO Managed Laboratories related to Water Quality Monitoring & Surveillance under Jal Jeevan Mission , SM/19071 Support-WQMSP Remuneration of lab personnel for the month of June 2024. BILL/00556/2024-2025 747/JJM 29/08/2024 0 AIKYATAN DEVELOPMENT SOCIETY 0.45 0.00 0 0
4989 PURBA BARDHAMAN Burdwan Division Operational charges of PHED & NGO Managed Laboratories related to Water Quality Monitoring & Surveillance under Jal Jeevan Mission , SM/19071 Support-WQMSP LABORATORY MAINTENANCE BILL FOR JANUARY TO JUNE 2024 BILL/00952/2024-2025 1050/JJM 05/11/2024 0 DR CHATTERJEES VILLAGE WELFARE SOCIETY 0.40 0.00 0 0
4990 PURBA BARDHAMAN Burdwan Division Operational charges of PHED & NGO Managed Laboratories related to Water Quality Monitoring & Surveillance under Jal Jeevan Mission , SM/19071 Support-WQMSP SALARY BILL FOR THE MONTH OF MAY-2024' BILL/00260/2024-2025 461/JJM 02/07/2024 0 SHASTRI SMRITI SANGHA 0.45 0.00 0 0
4991 PURBA BARDHAMAN Burdwan Division Operational charges of PHED & NGO Managed Laboratories related to Water Quality Monitoring & Surveillance under Jal Jeevan Mission , SM/19071 Support-WQMSP Salary bill for the month of June 2024 BILL/00557/2024-2025 748/JJM 29/08/2024 0 SHASTRI SMRITI SANGHA 0.45 0.00 0 0
4992 PURBA BARDHAMAN Burdwan Division Operational charges of PHED & NGO Managed Laboratories related to Water Quality Monitoring & Surveillance under Jal Jeevan Mission , SM/19071 Support-WQMSP Salary payment for the month of March'2024. BILL/00190/2024-2025 294/JJM 29/05/2024 0 AIKYATAN DEVELOPMENT SOCIETY 0.45 0.00 0 0
4993 PURBA BARDHAMAN Burdwan Division Operational charges of PHED & NGO Managed Laboratories related to Water Quality Monitoring & Surveillance under Jal Jeevan Mission , SM/19071 Support-WQMSP Remuneration of lab personnel for the month of August2024 BILL/00676/2024-2025 857/JJM 20/09/2024 0 AIKYATAN DEVELOPMENT SOCIETY 0.45 0.00 0 0
4994 PURBA BARDHAMAN Burdwan Division Operational charges of PHED & NGO Managed Laboratories related to Water Quality Monitoring & Surveillance under Jal Jeevan Mission , SM/19071 Support-WQMSP Grant The Remuneration of Lab Staff for Month of June- 2024 BILL/00558/2024-2025 749/JJM 29/08/2024 0 DR CHATTERJEES VILLAGE WELFARE SOCIETY 0.45 0.00 0 0
4995 PURBA BARDHAMAN Burdwan Division Operational charges of PHED & NGO Managed Laboratories related to Water Quality Monitoring & Surveillance under Jal Jeevan Mission , SM/19071 Support-WQMSP Festival Bonus For The Lab Personnel BILL/00899/2024-2025 1033/JJM 25/10/2024 0 SHASTRI SMRITI SANGHA 0.18 0.00 0 0
4996 PURBA BARDHAMAN Burdwan Division Operational charges of PHED & NGO Managed Laboratories related to Water Quality Monitoring & Surveillance under Jal Jeevan Mission , SM/19071 Support-WQMSP Grant The Remuneration of Lab Staff For The Month Of September-2024 BILL/00904/2024-2025 1045/JJM 30/10/2024 0 DR CHATTERJEES VILLAGE WELFARE SOCIETY 0.45 0.00 0 0
4997 PURBA BARDHAMAN Burdwan Division Operational charges of PHED & NGO Managed Laboratories related to Water Quality Monitoring & Surveillance under Jal Jeevan Mission , SM/19071 Support-WQMSP Monthly remuneration for the month of October 2024 BILL/01004/2024-2025 1087/JJM 29/11/2024 0 AIKYATAN DEVELOPMENT SOCIETY 0.45 0.00 0 0
4998 PURBA BARDHAMAN Burdwan Division Operational charges of PHED & NGO Managed Laboratories related to Water Quality Monitoring & Surveillance under Jal Jeevan Mission , SM/19071 Support-WQMSP Salary Bill for the month of October-2024 BILL/01006/2024-2025 1088/JJM 29/11/2024 0 SHASTRI SMRITI SANGHA 0.45 0.00 0 0
4999 PURBA BARDHAMAN Burdwan Division Operational charges of PHED & NGO Managed Laboratories related to Water Quality Monitoring & Surveillance under Jal Jeevan Mission , SM/19071 Support-WQMSP Grant the Remuneration of lab staff for the month of April-2024. BILL/00263/2024-2025 369/JJM 21/06/2024 0 DR CHATTERJEES VILLAGE WELFARE SOCIETY 0.45 0.00 0 0
5000 PURBA BARDHAMAN Burdwan Division Operational charges of PHED & NGO Managed Laboratories related to Water Quality Monitoring & Surveillance under Jal Jeevan Mission , SM/19071 Support-WQMSP Monthly Remuneration Of Lab Personnel For The Month of November-2024 BILL/01094/2024-2025 1176/JJM 17/12/2024 0 AIKYATAN DEVELOPMENT SOCIETY 0.45 0.00 0 0
5001 PURBA BARDHAMAN Burdwan Division Operational charges of PHED & NGO Managed Laboratories related to Water Quality Monitoring & Surveillance under Jal Jeevan Mission , SM/19071 Support-WQMSP Grant the remuneration of lab staff for the month of July 2024 BILL/00566/2024-2025 757/JJM 30/08/2024 0 DR CHATTERJEES VILLAGE WELFARE SOCIETY 0.45 0.00 0 0
5002 PURBA BARDHAMAN Burdwan Division Operational charges of PHED & NGO Managed Laboratories related to Water Quality Monitoring & Surveillance under Jal Jeevan Mission , SM/19071 Support-WQMSP Salary payment for the month of March'2024. BILL/00189/2024-2025 293/JJM 29/05/2024 0 SHASTRI SMRITI SANGHA 0.45 0.00 0 0
5003 PURBA BARDHAMAN Burdwan Division Operational charges of PHED & NGO Managed Laboratories related to Water Quality Monitoring & Surveillance under Jal Jeevan Mission , SM/19071 Support-WQMSP Grant the remuneration of lab staff for the month of August-2024 BILL/00677/2024-2025 856/JJM 20/09/2024 0 DR CHATTERJEES VILLAGE WELFARE SOCIETY 0.45 0.00 0 0
5004 PURBA BARDHAMAN Burdwan Division Operational charges of PHED & NGO Managed Laboratories related to Water Quality Monitoring & Surveillance under Jal Jeevan Mission , SM/19071 Support-WQMSP Supply of Residual Chlorine Kit and engagement of Laboratory personnel (Chemist/Bacteriologist/ Lab Assistant and Sampling Assistant) including maintenance in 3 Nos. Sub District Laboratories within Headquarters under Burdwan Division, PHE Dte., Purba Bardhaman. [Period For Twelve Months] i.e. period from 01.08.2024 to 31.07.2025. AE(HQs) J.E. 1 BURDWAN ORD/000369/2024-2025 2961/BWD 31/07/2024 365 BHARATI CHEMICAL AND SCIENTIFIC WORKS 29.46 14.83 50.34 50
5005 PURBA BARDHAMAN Burdwan Division Operational charges of PHED & NGO Managed Laboratories related to Water Quality Monitoring & Surveillance under Jal Jeevan Mission , SM/19071 Support-WQMSP Supply of Residual Chlorine Kit and engagement of Laboratory personnel (Chemist/Bacteriologist/ Lab Assistant and Sampling Assistant) including maintenance in 2 Nos. Sub District Laboratories within Burdwan Sadar Sub Division under Burdwan Division, PHE Dte., Purba Bardhaman. [Period For Twelve Months] i.e. period from 01.08.2024 to 31.07.2025. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000370/2024-2025 2962/BWD 31/07/2024 365 BHARATI CHEMICAL AND SCIENTIFIC WORKS 19.04 8.53 44.8 90
5006 PURBA BARDHAMAN Burdwan Division Operational charges of PHED & NGO Managed Laboratories related to Water Quality Monitoring & Surveillance under Jal Jeevan Mission , SM/19071 Support-WQMSP Continuation work order for Supply & Delivery of Chemicals, reagents and consumables for 14(Fourteen) laboratories under Burdwan Division, P.H.E. Dte. [For s (six) Months] AE(HQs) ORD/000171/2025-2026 1825/BWD 30/06/2025 30 BHARATI CHEMICAL AND SCIENTIFIC WORKS 19.69 0.00 0 0
5007 PURBA BARDHAMAN Burdwan Division Operational charges of PHED & NGO Managed Laboratories related to Water Quality Monitoring & Surveillance under Jal Jeevan Mission , SM/19071 Support-WQMSP Annual Maintenance Contract (AMC) for software upgradation and other software related issues in existing computers, refilling of Cartridge of the printers, replacement of battery of UPS in District Lab (1No.), Sub-Dist. Lab (11Nos.) (Barshul SDWTL, Satgachia SDWTL, Monteswar SDWTL, Sankari SDWTL, Anukhal SDWTL, Saktigarh SDWTL, Parulia SDWTL, Ganganandapur SDWTL, Sehera SDWTL, Bonnobogram SDWTL, Ketugram SDWTL) and NGO Lab (2Nos.) (Shastri Smriti Sangha&Aikyatan Development Society) under Burdwan Division, P.H.E. Dte. [Period from 01.02.2025 to 31.07.2025 i.e. Six Months] J.E. 1 BURDWAN ORD/001271/2024-2025 166/AE/HQ 31/01/2025 181 COMPUTER MEDIA 0.99 0.00 0 0
5008 PURBA BARDHAMAN Burdwan Division Operational charges of PHED & NGO Managed Laboratories related to Water Quality Monitoring & Surveillance under Jal Jeevan Mission , SM/19071 Support-WQMSP Continuation work for Supply of Residual Chlorine Kit and engagement of Laboratory personnel (Chemist/Bacteriologist/ Lab Assistant and Sampling Assistant) including maintenance in 4 Nos. Sub District Laboratories within Kalna Sub Division under Burdwan Division, PHE Dte., Purba Bardhaman. [Period For Six Months] i.e. period from 01.08.2025 to 31.01.2026. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000427/2025-2026 2227/BWD 01/08/2025 184 DULAL MAJUMDER 20.51 0.00 0 0
5009 PURBA BARDHAMAN Burdwan Division Operational charges of PHED & NGO Managed Laboratories related to Water Quality Monitoring & Surveillance under Jal Jeevan Mission , SM/19071 Support-WQMSP Continuation work for Supply of Residual Chlorine Kit and engagement of Laboratory personnel (Chemist/Bacteriologist/ Lab Assistant and Sampling Assistant) including maintenance in 2 Nos. Sub District Laboratories within Burdwan Sadar sub Division under Burdwan Division, PHE Dte., Purba Bardhaman. [Period from 01.08.2025 to 31.01.2026] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000324/2025-2026 2192/BWD 01/08/2025 184 BHARATI CHEMICAL AND SCIENTIFIC WORKS 9.73 0.00 0 0
5010 PURBA BARDHAMAN Burdwan Division Operational charges of PHED & NGO Managed Laboratories related to Water Quality Monitoring & Surveillance under Jal Jeevan Mission , SM/19071 Support-WQMSP Continuation work for Supply of Residual Chlorine Kit and engagement of Laboratory personnel (Chemist/Bacteriologist/ Lab Assistant and Sampling Assistant) including maintenance in 3 Nos. Sub District Laboratories within Headquarters under Burdwan Division, PHE Dte., Purba Bardhaman. [Period from 01.08.2025 to 31.01.2026] AE(HQs), Burdwan Division, PHE Dte. ORD/000600/2025-2026 2191/BWD 01/08/2025 184 BHARATI CHEMICAL AND SCIENTIFIC WORKS 15.06 0.00 0 0
5011 PURBA BARDHAMAN Burdwan Division Operational charges of PHED & NGO Managed Laboratories related to Water Quality Monitoring & Surveillance under Jal Jeevan Mission , SM/19071 Support-WQMSP Continuation work for Supply of Residual Chlorine Kit and engagement of Laboratory personnel (Chemist/Bacteriologist/ Lab Assistant and Sampling Assistant) including maintenance in 1 No. Sub District Laboratory within Durgapur Sub Division under Burdwan Division, PHE Dte., Purba Bardhaman. [Period 01.08.2025 to 31.08.2025 i.e. 1 (one) Month] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000342/2025-2026 2206/BWD 01/08/2025 31 DULAL MAJUMDER 0.80 0.00 0 0
5012 PURBA BARDHAMAN Burdwan Division Drinking water sample collection & testing through Field Test Kits (FTKs Phase-II) & uploading charges for the same related to Water Quality Monitoring & Surveillance Programme under Jal Jeevan Mission , SM/19072 Support-WQMSP Carriage of FTK Box to different BMOH office under Burdwan Division, PHE. Dte. AE(HQs) J.E. 1 BURDWAN ORD/000140/2024-2025 308/AE/HQ 10/06/2024 10 KHUSI BHAKAT 0.29 0.29 100 100
5013 PURBA BARDHAMAN Burdwan Division Drinking water sample collection & testing through Field Test Kits (FTKs Phase-II) & uploading charges for the same related to Water Quality Monitoring & Surveillance Programme under Jal Jeevan Mission , SM/19072 Support-WQMSP Hire Charges of Training Car & Carriage of FTK Box to different BMOH offices under Burdwan Division, PHE. Dte. AE(HQs), Burdwan Division, PHE Dte. Junior Engineer, Burdwan Division ORD/000634/2025-2026 1130/AE/HQ 11/09/2025 15 KHUSI BHAKAT 0.52 0.00 0 0
5014 PURBA BARDHAMAN Burdwan Division PROCUREMENT OF COMPUTER AND PERIPHERALS FOR THE DIFFERENT SUB DIVISION OFFICES AND BURDWAN DIVISION OFFICE PHE Dte , SM/16459 Support-MIS Procurement of materials from GEM (Invoice No.-GEM-29241467, dt.-20/03/2023, GEM-29240808, dt.-20/03/2023, GEM-28710492, dt.-11/03/2023) BILL/00125/2023-2024 250/JJM 14/06/2023 0 M/S S.S. INFOTECH 0.46 0.00 0 0
5015 PURBA BARDHAMAN Burdwan Division PROCUREMENT OF COMPUTER AND PERIPHERALS FOR THE DIFFERENT SUB DIVISION OFFICES AND BURDWAN DIVISION OFFICE PHE Dte , SM/16459 Support-MIS Supply of 02 Nos. HP Intel Core i5 windows 10 professional desktop computer.[GEM Invoice No.-GEM-28789462, DT.-13/03/2023] BILL/00086/2023-2024 190/JJM 31/05/2023 0 M/S S.S. INFOTECH 1.30 0.00 0 0
5016 PURBA BARDHAMAN Burdwan Division PROCUREMENT OF COMPUTER AND PERIPHERALS FOR THE DIFFERENT SUB DIVISION OFFICES AND BURDWAN DIVISION OFFICE PHE Dte , SM/16459 Support-MIS Supply of tonner NPG-51 for Canon Photocopier Machine. BILL/00087/2023-2024 262/JJM 15/06/2023 0 ELECTRO SERVICES PVT LTD. 0.06 0.00 0 0
5017 PURBA BARDHAMAN Burdwan Division PROCUREMENT OF COMPUTER AND PERIPHERALS FOR THE DIFFERENT SUB DIVISION OFFICES AND BURDWAN DIVISION OFFICE PHE Dte , SM/16459 Support-MIS Procurement of materials from GEM (HP Intel Core i3 windows 11 Professional) GEM Invoice No.-GEM-30241483, dt.-24/04/2023 BILL/00123/2023-2024 247/JJM 14/06/2023 0 EASY DAY ENTERPRISE 4.47 0.00 0 0
5018 PURBA BARDHAMAN Burdwan Division PROCUREMENT OF COMPUTER AND PERIPHERALS FOR THE DIFFERENT SUB DIVISION OFFICES AND BURDWAN DIVISION OFFICE PHE Dte , SM/16459 Support-MIS Procurement of materials from GEM (Canon Multifunction Machine) GEM Invoice No.-GEM-30301834, DT.-27/04/2023 BILL/00124/2023-2024 248/JJM 14/06/2023 0 IONET 3.75 0.00 0 0
5019 PURBA BARDHAMAN Burdwan Division PROCUREMENT OF COMPUTER AND PERIPHERALS FOR THE DIFFERENT SUB DIVISION OFFICES AND BURDWAN DIVISION OFFICE PHE Dte , SM/16459 Support-MIS Supply & delivery of computer monitor with necessary items at Durgapur (Burdwan North) Sub-Division and Headquarters, Burdwan Divn. under Burdwan Division, P.H.E. Dte. at PHE complex, Nababhat, Fagupur, Purba bardhaman-713104 J.E. 1 BURDWAN ORD/001057/2023-2024 147/AE/HQ 04/03/2024 15 HAZRA COMPUTER 1.00 1.00 100 100
5020 PURBA BARDHAMAN Burdwan Division PROCUREMENT OF COMPUTER AND PERIPHERALS FOR THE DIFFERENT SUB DIVISION OFFICES AND BURDWAN DIVISION OFFICE PHE Dte , SM/16459 Support-MIS Supply, delivery & Installation of CCTV Camera at Burdwan Division P.H.E. Dte. J.E. 1 BURDWAN ORD/001060/2023-2024 149/AE/HQ 04/03/2024 15 HAZRA COMPUTER 1.00 1.00 100 100
5021 PURBA BARDHAMAN Burdwan Division PROCUREMENT OF COMPUTER AND PERIPHERALS FOR THE DIFFERENT SUB DIVISION OFFICES AND BURDWAN DIVISION OFFICE PHE Dte , SM/16459 Support-MIS Supply & delivery of computer monitor with necessary items at Accounts Section under Burdwan Division, P.H.E. Dte. at PHE complex, Nababhat, Fagupur, Purba bardhaman-713104 J.E. 1 BURDWAN ORD/001058/2023-2024 148/AE/HQ 04/03/2024 15 HAZRA COMPUTER 1.00 1.00 100 100
5022 PURBA BARDHAMAN Burdwan Division PROCUREMENT OF COMPUTER AND PERIPHERALS FOR THE DIFFERENT SUB DIVISION OFFICES AND BURDWAN DIVISION OFFICE PHE Dte , SM/16459 Support-MIS Supply & delivery of computer peripheral items at Burdwan Division P.H.E. Dte. J.E. 1 BURDWAN ORD/001059/2023-2024 150/AE/HQ 04/03/2024 15 HAZRA COMPUTER 0.99 0.99 100 100
5023 PURBA BARDHAMAN Burdwan Division PROCUREMENT OF COMPUTER AND PERIPHERALS FOR THE DIFFERENT SUB DIVISION OFFICES AND BURDWAN DIVISION OFFICE PHE Dte , SM/16459 Support-MIS Procurement of computer peripheral through GEM (HP Desktop & HP Monitor)[08 Nos.] and HP Laserjet Printer [02 Nos.] BILL/02014/2023-2024 1921/JJM 30/03/2024 0 M/S S.S. INFOTECH 5.25 0.00 0 0
5024 PURBA BARDHAMAN Burdwan Division Procurement of equipments, glassware and chemicals required for NABL Accreditation of the District Laboratory, Nababhat under Burdwan Division. , SM/09241 Support-WQMSP Sanction order for deposit of Final assessment fee for NABL Accreditation of Burdwan District Laboratory under Burdwan Division, PHE Dte. ORD/000508/2022-2023 877/BSD 24/05/2022 92 ALAKA GHOSH 0.25 0.00 0 0
5025 PURBA BARDHAMAN Burdwan Division Procurement of equipments, glassware and chemicals required for NABL Accreditation of the District Laboratory, Nababhat under Burdwan Division. , SM/09241 Support-WQMSP Sanction order for deposit of annual accreditation fee for NABL Accreditation of Burdwan District Laboratory under Burdwan Division, PHE Dte. ORD/000506/2022-2023 1005/BSD 17/06/2022 92 ALAKA GHOSH 0.28 0.00 0 0
5026 PURBA BARDHAMAN Burdwan Division Procurement of equipments, glassware and chemicals required for NABL Accreditation of the District Laboratory, Nababhat under Burdwan Division. , SM/09241 Support-WQMSP Supply & Delivery of Chemicals, reagents and consumables at District Laboratory and 8 (Eight) Sub-District laboratories for NABL accreditation under Burdwan Division, P.H.E. Dte._Group : A AE(HQs) J.E. 2 BURDWAN ORD/000075/2022-2023 290/AE/HQ 17/05/2022 7 LAB SOLUTION 4.23 4.23 100 0
5027 PURBA BARDHAMAN Burdwan Division Procurement of equipments, glassware and chemicals required for NABL Accreditation of the District Laboratory, Nababhat under Burdwan Division. , SM/09241 Support-WQMSP Supply & installation of approved quality Curtain with fixing of other allied works for NABL recognition of District Laboratory, Nababhat PHE Complex under Burdwan Divn., PHE. Dte. [Group : E] AE(HQs) J.E. 2 BURDWAN ORD/000735/2021-2022 160/AE/HQ 17/03/2022 10 BHARAT CONSTRUCTION 0.79 0.79 100 0
5028 PURBA BARDHAMAN Burdwan Division Procurement of equipments, glassware and chemicals required for NABL Accreditation of the District Laboratory, Nababhat under Burdwan Division. , SM/09241 Support-WQMSP Procurement of Equipment's, Glassware and Chemicals required for NABL accreditation of the District Laboratory at Nababhat under Burdwan Division, PHE Dte._2nd Call. AE(HQs) J.E. 2 BURDWAN ORD/000763/2021-2022 6769/BWD 03/12/2021 20 LAB SOLUTION 9.15 9.15 100 0
5029 PURBA BARDHAMAN Burdwan Division Procurement of equipments, glassware and chemicals required for NABL Accreditation of the District Laboratory, Nababhat under Burdwan Division. , SM/09241 Support-WQMSP Calibration of Equipment/Glassware for Burdwan District Water Testing laboratory under Burdwan Division, PHE Dte. (Part-A) Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000863/2022-2023 1622/BSD 16/09/2022 3 MEASURE & PRECISION ENGINEERS 0.15 0.00 0 100
5030 PURBA BARDHAMAN Burdwan Division Procurement of equipments, glassware and chemicals required for NABL Accreditation of the District Laboratory, Nababhat under Burdwan Division. , SM/09241 Support-WQMSP Calibration of Equipment/Glassware for Burdwan District Water Testing laboratory under Burdwan Division,PHE Dte. (Part-B) Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000864/2022-2023 1623/BSD 16/09/2022 3 MEASURE & PRECISION ENGINEERS 0.12 0.00 0 100
5031 PURBA BARDHAMAN Burdwan Division Procurement of equipments, glassware and chemicals required for NABL Accreditation of the District Laboratory, Nababhat under Burdwan Division. , SM/09241 Support-WQMSP Providing NABL related expenses for renewal audit of Burdwan District Water testing Laboratory under Burdwan Division, PHE Dte. Contractual Junior Engineer,Junior Engineer, R.W.S. Burdwan Sub Division, P.H.E. Dt ORD/000001/2024-2025 145/RWS 18/04/2024 7 BHARATI CHEMICAL AND SCIENTIFIC WORKS 1.28 1.28 100 100
5032 PURBA BARDHAMAN Burdwan Division Procurement of equipments, glassware and chemicals required for NABL Accreditation of the District Laboratory, Nababhat under Burdwan Division. , SM/09241 Support-WQMSP Hire charges of 62.5 KVA Diesel Generator set for District Laboratory NABL Audit purpose including engagement one operator Technician and Diesel (8lit/hour) and all other incidental charges. BILL/00515/2024-2025 690/JJM 14/08/2024 0 KHUSI BHAKAT 0.08 0.00 0 0
5033 PURBA BARDHAMAN Burdwan Division Drinking water sample collection & testing through Filed Test Kits (FTKs) & uploading charges for the same related to Water Quality Monitoring & Surveillance Programme. , SM/08993 Support-WQMSP Transfer of fund for Field Test Kit (FTK) programme to CMOH, Purba Bardhaman. VCH/000488/2022-2023 392/FTK/22-23 05/08/2022 0 DISTRICT HEALTH & FAMILY WELFARE SAMITY 20.00 0.00 0 0
5034 PURBA BARDHAMAN Burdwan Division Drinking water sample collection & testing through Filed Test Kits (FTKs) & uploading charges for the same related to Water Quality Monitoring & Surveillance Programme. , SM/08993 Support-WQMSP Transfer of fund for Field Test Kit (FTK) programme to CMOH, Purba Bardhaman. VCH/000288/2022-2023 01/08/2022 0 DISTRICT HEALTH & FAMILY WELFARE SAMITY 25.80 0.00 0 0
5035 PURBA BARDHAMAN Burdwan Division Drinking water sample collection & testing through Filed Test Kits (FTKs) & uploading charges for the same related to Water Quality Monitoring & Surveillance Programme. , SM/08993 Support-WQMSP Supply and delivery of portable multi-parameter water quality testing device including training on operation of the device in addition to online entry, management, analysis and reporting of water quality test results in State Water Quality Dashboard and IMIS both for monitoring water safety status of rural drinking water sources of 138 Nos. Gram Panchayats in Purba Bardhaman District of West Bengal under PHE Department. ........ [Excluding Sl. No. 03 in the B.O.Q.] ORD/000364/2021-2022 119/BWD 07/01/2022 60 SUNANDA ENVIROMENTAL INTERNATIONAL PVT LTD. 20.46 6.57 32.11 0
Total 5,20,069.54 1,00,257.14 19.28