List of issued work order
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
19 6,194.58 996.91 16.09  
1 HOWRAH Udaynarayanpur Howrah Division Bedhi Chandrapur Piped Water Supply Scheme , SM/18490 New Sinking of 2nos 250 X 150mm dia Tube Well 230 mtr,Construction of 2nos Pump House cum switch room with sanitary arrangement, Laying Distribution system (LDS) with necessary inter-connections with OHR and bypass arrangement etc. all complete, Functional Household Tap Connection (FHTC) works, Construction of 300 cum capacity 20 Mtr. staging height RCC Over Head Reservoir (Drawing No- PC-I/O.H.R/7/2012)with necessary soil investigation with foundation design as per soil test report for BEDHI CHANDRAPUR PWSS at Udaynarayanpur Block under Uluberia Sub-Division under, Howrah Division, P. H. E. Dte. AE/RWS JE/RWS/Amta II,JE/RWS/Sankrail,JE/RWS/Udaynaryanpur,JE Sadar ORD/000137/2023-2024 2758/HD 31/07/2023 1097 JAHANGIR ALAM 335.32 152.52 45.48 42
2 HOWRAH Bagnan-I Howrah Division Hijlak Piped Water Supply Scheme in Bagnan-I block under Howrah district , SM/13747 New Work order for Laying Distribution System(HDPE & DI) & providing Functional Household Tap Connection (FHTC) & Interconnection between tube wells & 300 cu.m. capacity 20 mtr staging height RCC Over Head Reservoir including Pipe connection & soil investigation including pile design & Construction of 5.40Mx 3.60M Swtich Room with Plinth Height (600mm to 1000mm) with Sanitary and water Supply arrangement at Head Work Site HIjlak PWSS OF BAGNAN-I BLOCK UNDER THE ULUBERIA SUB DIVISION UNDER HOWRAH DIVISION, P.H.E. DTE. AE/Ulu je/blk/bagn1 ORD/000105/2023-2024 2696/HD 24/07/2023 1096 PRADIP KUMAR JATI 293.89 75.84 25.81 1
3 HOWRAH Domjur Howrah Division Bipra Noapara PWSS with provision of FHTC Connection Block-Domjur, Howrah. , SM/11711 New 2Nos Construction of Pump House (5.40m x 3.60 m) at 1st & 2nd Tube Well Site, Reparing of 2 nos ExistingPump House 3rd & 4th TW site (3.60m x 3.00 m), Construction of Boundary Wall at 1st Tube Well Site (30 m X 20 m), 3 nos Boundary Wall at 2nd, 3rd & 4th Tube Well Site (12 m X 12 m), Construction of 450 cum Capacity, 20mtr. Staging Height RCC Elevated Reservoir As Per Departmental Type Design (Ref : Dept. Super Struc. DRG. No. PC-I/OHR/4/2012) including Soil Investigation, Foundation Design & All pipe Connection, Rising Main Pipeline Work From 4th Pump House, 3rd Pump House, 2nd Pump House to 1st Pump House & OHR, Laying Distribution of Pipeline & Providing FHTC (Functional Household Tap Connection) Augmentation of Bipra Noapara at PWSS at Domjur Block of Howrah District under Howrah Division, P. H. E. Dte. AE/SADAR je1_iu,je_blk_ballyjag_how ORD/000134/2023-2024 2713/HD 25/07/2023 1095 B.B.C ENTERPRISE 556.42 238.94 42.94 82
4 HOWRAH Howrah Division Augmentation of surface water based Sankrail Piped water supply scheme , SM/19187 Augmentation Laying Distribution Pipeline and providing FHTC at Zone-9B for Augmentation of Sankrail Surface Water Based Project of Howrah District under Howrah Division, P. H. E. Dte. [No. of FHTC = 5717] AE/SADAR JE Sadar ORD/000615/2023-2024 1174/HD 07/03/2024 846 MONDAL ENTERPISE 947.00 0.00 0 30
5 HOWRAH Howrah Division Augmentation of surface water based Sankrail Piped water supply scheme , SM/19187 Augmentation Laying Distribution Pipeline and providing FHTC at Zone-2 for Augmentation of Sankrail Surface Water Based Project of Howrah District under Howrah Division, P. H. E. Dte. [No. of FHTC = 5396] AE/SADAR JE Sadar ORD/000608/2023-2024 1186/HD 09/03/2024 936 LIMRA CONSTRUCTION AND INDUSTRIAL DEVELOPMENT 907.20 0.00 0 30
6 HOWRAH Howrah Division Augmentation of surface water based Sankrail Piped water supply scheme , SM/19187 Augmentation Laying Distribution Pipeline and providing FHTC at Zone-11 for Augmentation of Sankrail Surface Water Based Project of Howrah District under Howrah Division, P. H. E. Dte. [No. of FHTC = 8889] AE/SADAR JE Sadar,Junior Engineer ORD/000617/2023-2024 1165/HD 07/03/2024 846 M/S R.S. CONSTRUCTION 1,341.84 0.00 0 10
7 HOWRAH Bagnan-I Howrah Division Chandrapur Piped Water Supply Scheme with provision of FHTC, Block - Bagnan-I, Howrah. , SM/11717 New Work Order for Laying Distribution System (HDPE & DI) & providing Functional Household Tap Connection (FHTC)(Mouza-Chandrapur (58) & Interconnection for 2nd TW and 1st Tube well (HW site)& Construction of 300 cum capacity 20 Mtr. staging height RCC Over Head Reservoir including pile foundation, pipe connection and cost of pipes, specials (Drawing No.PC-I/OHR/07/2012 (Sheet No.1&2) with Soil test & Design for Chandrapur PWSS of Bagnan-I Block under Uluberia Sub Division under Howrah Division P.H.E. Dte. AE/Ulu je/blk/bagn1 ORD/000043/2023-2024 1746/HD 25/04/2023 1200 K.M. ENTERPRISE 300.94 0.00 0 0
8 HOWRAH Domjur Electrical Baniara PWSS with provision of FHTC connection , SM/11722 New Supply, delivery & installation of submersible pumping machinery and other electrical/ mechanical equipments etc. including allied works for Baniara water supply scheme, T.W. No.- I, II & III, Block: Domjur, District- Howrah under Electrical Division, PHE Dte. Assistant Engineer Howrah mechanical Sub Division Junior Engineer5 ORD/000079/2023-2024 1996/ED 19/05/2023 1170 SANKAR PRASAD DUTTA & CO. 35.90 22.74 63.34 60
9 HOWRAH Jagatballavpur Howrah Division Sealdanga Piped Water Supply Scheme , SM/14866 New Work Order for Laying Distribution Pipeline & Providing Functional Household Tap Connection((part-2), 550 nos of Sealdanga PWSS at J.B.PUR Blockof Howrah District under Howrah Division, P. H. E. Dte. AE/SADAR je_how_rws_jagat,JE Sadar ORD/000013/2023-2024 1545/HD 04/04/2023 1200 M/S ASHIRBAD (INDIA) 86.98 14.30 16.44 15
10 HOWRAH Jagatballavpur Howrah Division Sealdanga Piped Water Supply Scheme , SM/14866 New Construction of 2 nos 5.40Mx 3.60M Swtich Room with Plinth Height (600mm to 2000mm) with Sanitary and water Supply arrangement at Head Work Site& other tubewell site, Construction of Boundary Wall at 1st Tube Well Site, Construction of Boundary Wall at 2nd Tube Well Site, Rising Main Pipeline Work From 2nd Pump House to 1st Pump House & OHR Laying Distribution Pipeline & Providing FHTC (Functional Household Tap Connection) (550 Nos) For Sealdanga PWSS at J.B.PUR Blockof Howrah District under Howrah Division, P. H. E. Dte. AE/SADAR je_how_rws_jagat,JE Sadar ORD/000135/2023-2024 2736/HD 26/07/2023 1066 SWASTIK ENTERPRISE 123.64 0.00 0 20
11 HOWRAH Udaynarayanpur Howrah Division Khila Piped Water Supply Scheme with FHTC, Block Udaynarayanpur. , SM/12270 New Construction of 600 cum capacity 20 mtr. Staging height RCC Elevated Reservoir as per Departmental Design Drawing including Soil Investigation, Design of Pile foundation & all pipe connections for KHILA PWSS of Udaynarayanpur Block under Howrah Division, P.H.E. Dte. (SM/12270) AE/RWS JE/RWS/Uluberia I ORD/000105/2025-2026 3083/HD 08/07/2025 365 ABDUL HAI 158.66 0.00 0 0
12 HOWRAH Uluberia-II Howrah Division Kamina Piped Water Supply Scheme with provision of FHTC , SM/16927 New Work Order for Construction of 400 cum capacity 20 Mtr. staging height RCC Over Head Reservoir (including pile foundation), pipe connection and cost of pipes, specials for in Kamina PWSS of Uluberia-II Block under Uluberia Sub Division under Howrah Division P.H.E. Dte. in the District of Howrah. AE/Ulu JE-USD ORD/000010/2023-2024 1593/HD 12/04/2023 1200 ARUP NANDY 138.34 37.81 27.33 90
13 HOWRAH Howrah Division Augmentation of Bamunhati Water Supply Scheme , SM/12874 Augmentation Laying Distribution System & Providing Household Tap Connection (FHTC) for Augmentation of Bamunhati Piped Water Supply Scheme (Part D :-LDS & FHTC of Mahishrekha Village) in Uluberia-II Block of Howrah District under Howrah Division, P. H. E. Dte. AE/Ulu JE/USD ORD/000106/2023-2024 2697/HD 24/07/2023 1080 CONSTRUCTION CORNER 104.49 0.00 0 60
14 HOWRAH Domjur Howrah Division Ground water based water supply Scheme for Domjur (Zone-VIII) Domjur (CT) and its adjoining areas to Accommodate FHTC in Domjur Block, Diatrict-Howrah , SM/14155 New Work Order for Construction of 600 cum Capacity, 20mtr. Staging Height RCC Elevated Reservoir As Per Departmental Type Design (Ref : Dept. Super Struc. DRG. No. PC-I/OHR/8/2012) including Soil Investigation, Foundation Design & All pipe Connection For Domjur Zone-VIII, Domjur (CT) PWSS at Domjur Block of Howrah District under Howrah Division, P. H. E. Dte. AE/SADAR je1_iu,je_blk_ballyjag_how ORD/000034/2023-2024 1741/HD 25/04/2023 1173 M/S ASHIRBAD (INDIA) 174.05 37.81 21.72 60
15 HOWRAH Howrah Division DEULPUR-GANGADHARPUR (ZONE-II) PIPED WATER SUPPLY SCHEME. , SM/14154 Augmentation Work Order for Laying Distribution Pipeline work with Providing FHTC (Functional Household Tap Connection) For Augmentation of Deulpur Gangadharpur Zone-II PWSS at Panchla Block of Howrah Sadar Sub Division under Howrah Division, P.H.E. Dte. From Node Section 255-287 to Node Section 90-91 From Node Section 287-304 to Node Section 448-450 (P-2,&4) AE/SADAR je_how_rws_jagat ORD/000005/2023-2024 1532/HD 04/04/2023 1233 N. G ENGINEERING 91.11 77.74 85.33 85
16 HOWRAH Howrah Division DEULPUR & GANGADHARPUR ZONE-I PIPED WATER SUPPLY SCHEME. , SM/18560 Augmentation Laying Distribution Pipeline work with Providing FHTC (Functional Household Tap Connection-1818 NOS) For Augmentation of Deulpur Gangadharpur Zone-I PWSS at Panchla Block of Howrah Sadar Sub Division under Howrah Division, P. H. E. Dte. From Node Section 7-34 to Node Section 74-77, From Node Section 101-248 to Node Section 356-358, From Node Section 72-84 to Node Section 241-256, From Node Section 256-257 to Node Section 449-450 (P-5,6,7 & 8) AE/SADAR je_how_rws_jagat ORD/000151/2023-2024 2956/HD 16/08/2023 1080 M/S ASHIRBAD (INDIA) 179.05 159.15 88.89 85
17 HOWRAH Howrah Division DEULPUR & GANGADHARPUR ZONE-I PIPED WATER SUPPLY SCHEME. , SM/18560 Augmentation Laying of additional distribution pipe line & allied works at Deulpur Gangadharpur Zone-I PWSS at Panchla Block under Howrah Sadar Sub-Division of Howrah Division PHE Dte. AE/SADAR je_how_rws_jagat ORD/000399/2024-2025 859/HD 07/02/2025 525 M/S ASHIRBAD (INDIA) 87.30 0.00 0 40
18 HOWRAH Howrah Division Augmentation of Ground water based PWSS Jujarsah , SM/10146 Augmentation Work Order for Laying Distribution Pipeline With FHTC of Jujarsah PWSS at Panchla Block of Howrah Sadar Sub Division under Howrah Division, P. H. E. Dte. From Section 263-307 to Section 526-533 (Part-B) AE/SADAR je_how_rws_jagat,JE Sadar ORD/000367/2022-2023 1827/HD 07/09/2022 1370 M/S ASHIRBAD (INDIA) 149.32 77.93 52.19 40
19 HOWRAH Howrah Division Augmentation of Ground water based PWSS Jujarsah , SM/10146 Augmentation Work Order for Laying Distribution Pipeline With FHTC of Jujarsah PWSS at Panchla Block of Howrah Sadar Sub Division under Howrah Division, P. H. E. Dte. From Section Node 248-265 to Section Node 449-453 (Part-D) AE/SADAR je_how_rws_jagat ORD/000359/2022-2023 1819/HD 06/09/2022 1390 N. G ENGINEERING 183.13 102.13 55.77 30
Total 6,194.58 996.90 16.09